WorldWideScience

Sample records for operations monitoring concept

  1. Operations monitoring concept. Consolidated Fuel Reprocessing Program

    International Nuclear Information System (INIS)

    Kerr, H.T.

    1985-01-01

    Operations monitoring is a safeguards concept which could be applied in future fuel cycle facilities to significantly enhance the effectiveness of an integrated safeguards system. In general, a variety of operations monitoring techniques could be developed for both international and domestic safeguards application. The goal of this presentation is to describe specific examples of operations monitoring techniques as may be applied in a fuel reprocessing facility. The operations monitoring concept involves monitoring certain in-plant equipment, personnel, and materials to detect conditions indicative of the diversion of nuclear material. An operations monitoring subsystem should be designed to monitor operations only to the extent necessary to achieve specified safeguards objectives; there is no intent to monitor all operations in the facility. The objectives of the operations monitoring subsystem include: verification of reported data; detection of undeclared uses of equipment; and alerting the inspector to potential diversion activities. 1 fig

  2. Monitored Geologic Repository Concept of Operations

    International Nuclear Information System (INIS)

    Curry, P.M.

    1999-01-01

    This updated document provides the top level guidance for development of the individual systems for the MGR which will be further developed in the System Description Documents. This document will serve as guidance for the development of functional interface and operational requirements. However, the data and engineering values presented in Monitored Geologic Repository Concept of Operations are provided as estimates or summaries of the current design. The original analyses or supporting documents must be utilized if the data or engineering values are used for design inputs. The concepts presented will be utilized as inputs for the development of operational concepts for the individual systems. It is recognized that the references listed may contain existing data or data which are to be verified. However, the data and engineering values presented will not impact the concepts presented in this technical document. As such, the data and engineering values are not being tracked as To Be Verified data. This revision was created to incorporate changes resulting from Enhanced Design Alternative II and Revision 3, DCN 01, of the Monitored Geologic Repository Requirements (YMP 1999)

  3. DATA PROCESSING CONCEPTS FOR THE INTEGRATION OF SAR INTO OPERATIONAL VOLCANO MONITORING SYSTEMS

    Directory of Open Access Journals (Sweden)

    F. J. Meyer

    2013-05-01

    Full Text Available Remote Sensing plays a critical role in operational volcano monitoring due to the often remote locations of volcanic systems and the large spatial extent of potential eruption pre-cursor signals. Despite the all-weather capabilities of radar remote sensing and despite its high performance in monitoring change, the contribution of radar data to operational monitoring activities has been limited in the past. This is largely due to (1 the high data costs associated with radar data, (2 the slow data processing and delivery procedures, and (3 the limited temporal sampling provided by spaceborne radars. With this paper, we present new data processing and data integration techniques that mitigate some of the above mentioned limitations and allow for a meaningful integration of radar remote sensing data into operational volcano monitoring systems. The data integration concept presented here combines advanced data processing techniques with fast data access procedures in order to provide high quality radar-based volcano hazard information at improved temporal sampling rates. First performance analyses show that the integration of SAR can significantly improve the ability of operational systems to detect eruptive precursors. Therefore, the developed technology is expected to improve operational hazard detection, alerting, and management capabilities.

  4. Mission operations concepts for Earth Observing System (EOS)

    Science.gov (United States)

    Kelly, Angelita C.; Taylor, Thomas D.; Hawkins, Frederick J.

    1991-01-01

    Mission operation concepts are described which are being used to evaluate and influence space and ground system designs and architectures with the goal of achieving successful, efficient, and cost-effective Earth Observing System (EOS) operations. Emphasis is given to the general characteristics and concepts developed for the EOS Space Measurement System, which uses a new series of polar-orbiting observatories. Data rates are given for various instruments. Some of the operations concepts which require a total system view are also examined, including command operations, data processing, data accountability, data archival, prelaunch testing and readiness, launch, performance monitoring and assessment, contingency operations, flight software maintenance, and security.

  5. A sensor management architecture concept for monitoring emissions from open-air demil operations.

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, Michael M.; Robinson, Jerry D.; Stoddard, Mary Clare; Horn, Brent A.; Lipkin, Joel; Foltz, Greg W.

    2005-09-01

    Sandia National Laboratories, CA proposed a sensor concept to detect emissions from open-burning/open-detonation (OB/OD) events. The system would serve two purposes: (1) Provide data to demilitarization operations about process efficiency, allowing process optimization for cleaner emissions and higher efficiency. (2) Provide data to regulators and neighboring communities about materials dispersing into the environment by OB/OD operations. The proposed sensor system uses instrument control hardware and data visualization software developed at Sandia National Laboratories to link together an array of sensors to monitor emissions from OB/OD events. The suite of sensors would consist of various physical and chemical detectors mounted on stationary or mobile platforms. The individual sensors would be wirelessly linked to one another and controlled through a central command center. Real-time data collection from the sensors, combined with integrated visualization of the data at the command center, would allow for feedback to the sensors to alter operational conditions to adjust for changing needs (i.e., moving plume position, increased spatial resolution, increased sensitivity). This report presents a systems study of the problem of implementing a sensor system for monitoring OB/OD emissions. The goal of this study was to gain a fuller understanding of the political, economic, and technical issues for developing and fielding this technology.

  6. Project Design Concept for Monitoring and Control System

    International Nuclear Information System (INIS)

    MCGREW, D.L.

    2000-01-01

    This Project Design Concept represents operational requirements established for use in design the tank farm Monitoring and Control System. These upgrades are included within the scope of Project W-314, Tank Farm Restoration and Safe Operations

  7. Preliminary Concept of Operations for a Global Cylinder Identification and Monitoring System

    Energy Technology Data Exchange (ETDEWEB)

    Whitaker, J. M. [ORNL; White-Horton, J. L. [ORNL; Morgan, J. B. [InSolves Associates

    2013-08-01

    This report describes a preliminary concept of operations for a Global Cylinder Identification and Monitoring System that could improve the efficiency of the International Atomic Energy Agency (IAEA) in conducting its current inspection activities and could provide a capability to substantially increase its ability to detect credible diversion scenarios and undeclared production pathways involving UF6 cylinders. There exist concerns that a proliferant State with access to enrichment technology could obtain a cylinder containing natural or low-enriched uranium hexafluoride (UF6) and produce a significant quantity (SQ)1 of highly enriched uranium in as little as 30 days. The National Nuclear Security Administration (NNSA) through the Next Generation Safeguards Initiative sponsored a multi-laboratory team to develop an integrated system that provides for detecting scenarios involving 1) diverting an entire declared cylinder for enrichment at a clandestine facility, 2) misusing a declared cylinder at a safeguarded facility, and 3) using an undeclared cylinder at a safeguarded facility. An important objective in developing this integrated system was to improve the timeliness for detecting the cylinder diversion and undeclared production scenarios. Developing this preliminary concept required in-depth analyses of current operational and safeguards practices at conversion, enrichment, and fuel fabrication facilities. The analyses evaluated the processing, movement, and storage of cylinders at the facilities; the movement of cylinders between facilities (including cylinder fabrication); and the misuse of safeguarded facilities.

  8. Modern handling and monitoring concepts for nuclear power plants

    International Nuclear Information System (INIS)

    Hofmann, H.; Lochner, K.H.

    1989-01-01

    Advanced microprocessor technology offers new means and methods also to power plant operation to improve the man-machine interface by using VDU's for process control, thus enhancing plant safety and reliability. A future control-room concept involving operation and monitoring to be effected by means of VDU's exclusively, calls for a detailed knowledge of the requirements which are made by the process and the operator on the system, and for the application of a very powerful microprocessor technology. Visualization of operating and monitoring processes matched to the needs of operators should be possible at high functionality and display quality without substantial restrictions caused by the device technology used. (orig.) [de

  9. Concept of ICRU's operational quantity and its application

    International Nuclear Information System (INIS)

    Murakami, Hiroyuki

    1995-01-01

    The operational quantity which was introduced in the ICRU report 39 published in 1985 was shocking rather than fresh for the author. The report was translated into Japanese, but at the beginning, the contents were not able to be understood. Thereafter, the measurement of ICRU sphere dose equivalent was introduced in a national law. But it is feared that the understanding of this operational quantity is limited to specialist level, and is not by men of practical works. The meaning of ''operational'' must be that workers measure and obtain dose on the spot for the radiation protection for themselves. The principles used when ICRU considered the new practical measured quantity are shown. In the definition of operational quantity in area monitoring, two concepts of expanded and aligned connect real measurement with the operational quantity. The problems of measuring individual dose equivalent are discussed. As to the reality of applying the operational quantity, the fundamentals of the calibration of measuring instruments, the investigation of the operational quantity in relation to measuring instruments and measurement mode, and the relation of area monitoring and individual monitoring are described. (K.I.)

  10. Current concepts in blood glucose monitoring.

    Science.gov (United States)

    Khadilkar, Kranti Shreesh; Bandgar, Tushar; Shivane, Vyankatesh; Lila, Anurag; Shah, Nalini

    2013-12-01

    Blood glucose monitoring has evolved over the last century. The concept of adequate glycemic control and minimum glycemic variability requires an ideal, accurate and reliable glucose monitoring system. The search for an ideal blood glucose monitoring system still continues. This review explains the various blood glucose monitoring systems with special focus on the monitoring systems like self- monitored blood glucose (SMBG) and continuous glucose monitoring system (CGMS). It also focuses on the newer concepts of blood glucose monitoring and their incorporation in routine clinical management of diabetes mellitus.

  11. Current concepts in blood glucose monitoring

    Science.gov (United States)

    Khadilkar, Kranti Shreesh; Bandgar, Tushar; Shivane, Vyankatesh; Lila, Anurag; Shah, Nalini

    2013-01-01

    Blood glucose monitoring has evolved over the last century. The concept of adequate glycemic control and minimum glycemic variability requires an ideal, accurate and reliable glucose monitoring system. The search for an ideal blood glucose monitoring system still continues. This review explains the various blood glucose monitoring systems with special focus on the monitoring systems like self- monitored blood glucose (SMBG) and continuous glucose monitoring system (CGMS). It also focuses on the newer concepts of blood glucose monitoring and their incorporation in routine clinical management of diabetes mellitus. PMID:24910827

  12. Current concepts in blood glucose monitoring

    Directory of Open Access Journals (Sweden)

    Kranti Shreesh Khadilkar

    2013-01-01

    Full Text Available Blood glucose monitoring has evolved over the last century. The concept of adequate glycemic control and minimum glycemic variability requires an ideal, accurate and reliable glucose monitoring system. The search for an ideal blood glucose monitoring system still continues. This review explains the various blood glucose monitoring systems with special focus on the monitoring systems like self- monitored blood glucose (SMBG and continuous glucose monitoring system (CGMS. It also focuses on the newer concepts of blood glucose monitoring and their incorporation in routine clinical management of diabetes mellitus.

  13. Preliminary Analysis of Remote Monitoring and Robotic Concepts for Performance Confirmation

    International Nuclear Information System (INIS)

    McAffee, D.A.

    1997-01-01

    As defined in 10 CFR Part 60.2, Performance Confirmation is the ''program of tests, experiments and analyses which is conducted to evaluate the accuracy and adequacy of the information used to determine with reasonable assurance that the performance objectives for the period after permanent closure will be met''. The overall Performance Confirmation program begins during site characterization and continues up to repository closure. The main purpose of this document is to develop, explore and analyze initial concepts for using remotely operated and robotic systems in gathering repository performance information during Performance Confirmation. This analysis focuses primarily on possible Performance Confirmation related applications within the emplacement drifts after waste packages have been emplaced (post-emplacement) and before permanent closure of the repository (preclosure). This will be a period of time lasting approximately 100 years and basically coincides with the Caretaker phase of the project. This analysis also examines, to a lesser extent, some applications related to Caretaker operations. A previous report examined remote handling and robotic technologies that could be employed during the waste package emplacement phase of the project (Reference 5.1). This analysis is being prepared to provide an early investigation of possible design concepts and technical challenges associated with developing remote systems for monitoring and inspecting activities during Performance Confirmation. The writing of this analysis preceded formal development of Performance Confirmation functional requirements and program plans and therefore examines, in part, the fundamental Performance Confirmation monitoring needs and operating conditions. The scope and primary objectives of this analysis are to: (1) Describe the operating environment and conditions expected in the emplacement drifts during the preclosure period. (Presented in Section 7.2). (2) Identify and discuss the

  14. Bunch arrival time monitors; Concepts towards improving the sensitivity for low charge operation for FLASH II and XFEL

    Energy Technology Data Exchange (ETDEWEB)

    Penirschke, Andreas; Angelovski, Aleksandar; Jakoby, Rolf [TU Darmstadt, Institut fuer Mikrowellentechnik und Photonik, Merckstr. 25, 64283 Darmstadt (Germany); Sydlo, Cezary; Bousonville, Michael; Czwalinna, Marie Kristin; Schlarb, Holger [Deutsches Elektronen-Synchrotron (DESY), Hamburg (Germany); Kuhl, Alexander [University of Hamburg, Physics Department, Accelerator Physics Group (Germany); Weiland, Thomas [Technische Univ. Darmstadt (Germany). Inst. fuer Theorie Elektromagnetischer Felder

    2013-07-01

    High gain Free-Electron Lasers can generate ultra short X-ray pulses in the femtosecond range. For a stable operation of the FEL, the precise knowledge of the bunch arrival time is crucial. A novel high bandwidth Bunch Arrival time Monitor was recently installed at FLASH to allow a low charge operation mode with a sub-10 fs resolution for bunch charges of 20 pC or more. The BAM is equipped with cone shaped pickups for the precise measurement of both, the high and low bunch charge operation mode. For the extension of FLASH facility to FLASH II new pickups for the high bandwidth BAMs need to be developed. The new BAM needs to maximize the voltage level of the beam induced signal for low charge operation mode in order to provide sufficient signal strength for the subsequent electronics. In this talk, we present concepts to improve the signal strength at the electro-optic modulators for low charge operation at FLASH II and XFEL.

  15. Centralized operation and monitoring system for nuclear power plants

    International Nuclear Information System (INIS)

    Kudo, Mitsuru; Sato, Hideyuki; Murata, Fumio

    1988-01-01

    According to the prospect of long term energy demand, in 2000, the nuclear power generation facilities in Japan are expected to take 15.9% of the total energy demand. From this fact, it is an important subject to supply nuclear power more stably, and in the field of instrumentation and control, many researches and developments and the incessant effort of improvement have been continued. In the central operation and monitoring system which is the center of the stable operation of nuclear power plants, the man-machine technology aiding operators by electronic and computer application technologies has been positively developed and applied. It is considered that hereafter, for the purpose of rationally heightening the operation reliability of the plants, the high quality man-machine system freely using the most advanced technologies such as high reliability digital technology, optical information transmission, knowledge engineering and so on is developed and applied. The technical trend of operation and monitoring system, the concept of heightening operation and monitoring capability, the upgrading of operation and monitoring system, and the latest operation, monitoring and control systems for nuclear power plants and waste treatment facilities are described. (K.I.)

  16. The Rendezvous Monitoring Display Capabilities of the Rendezvous and Proximity Operations Program

    Science.gov (United States)

    Brazzel, Jack; Spehar, Pete; Clark, Fred; Foster, Chris; Eldridge, Erin

    2013-01-01

    The Rendezvous and Proximity Operations Program (RPOP) is a laptop computer- based relative navigation tool and piloting aid that was developed during the Space Shuttle program. RPOP displays a graphical representation of the relative motion between the target and chaser vehicles in a rendezvous, proximity operations and capture scenario. After being used in over 60 Shuttle rendezvous missions, some of the RPOP display concepts have become recognized as a minimum standard for cockpit displays for monitoring the rendezvous task. To support International Space Station (ISS) based crews in monitoring incoming visiting vehicles, RPOP has been modified to allow crews to compare the Cygnus visiting vehicle s onboard navigated state to processed range measurements from an ISS-based, crew-operated Hand Held Lidar sensor. This paper will discuss the display concepts of RPOP that have proven useful in performing and monitoring rendezvous and proximity operations.

  17. Current concepts in blood glucose monitoring

    OpenAIRE

    Khadilkar, Kranti Shreesh; Bandgar, Tushar; Shivane, Vyankatesh; Lila, Anurag; Shah, Nalini

    2013-01-01

    Blood glucose monitoring has evolved over the last century. The concept of adequate glycemic control and minimum glycemic variability requires an ideal, accurate and reliable glucose monitoring system. The search for an ideal blood glucose monitoring system still continues. This review explains the various blood glucose monitoring systems with special focus on the monitoring systems like self- monitored blood glucose (SMBG) and continuous glucose monitoring system (CGMS). It also focuses on t...

  18. Application of ConceptDraw Office for planning, documenting, monitoring of operating processes

    International Nuclear Information System (INIS)

    Bocharnikov, O.P.; Savenko, S.V.; Nikiforov, N.S.

    2011-01-01

    ConceptDraw Office allows effectively deciding the following tasks: to carry out planning, designing, control of implementation of production processes; to prepare working documents (engineering diagrams, process flor diagrams, evacuation and emergency plans; to create dashboards with information for organization management; to distribute the organization resources with the purpose of increase of efficiency and safety of operating processes.

  19. Experimental validation of concept for real-time wavelength monitoring and tracking in densely populated WDM networks

    Science.gov (United States)

    Vukovic, Alex; Savoie, Michel; Hua, Heng; Campbell, Scott; Nguyen, Thao

    2005-10-01

    As the telecom industry responds with technological innovations to requests for higher data rates, increased number of wavelengths at higher densities, longer transmission distances and more intelligence for next generation optical networks, new monitoring schemes based on monitoring and tracking of each wavelength need to be developed and deployed. An optical layer monitoring scheme, based on tracking key optical parameters per each wavelength, is considered to be one of enablers for the transformation of today's opaque networks to dynamic, agile future networks. Ever-tighter network monitoring and control will be required to fulfill customer Service Level Agreements (SLAs). A wavelength monitoring and tracking concept was developed as a three-step approach. It started with the identification of all critical parameters required to obtain sufficient information about each wavelength; followed by the deployment of a cost-efficient device to provide simultaneous, accurate measurements in real-time of all critical parameters; and finally, the formulation of a specification for wavelength monitoring and tracking devices for real-time, simultaneous measurements and processing the data. A prototype solution based on a commercially available integrated modular spectrometer within a testbed environment associated with the all-optical network (AON) demonstrator program was used to verify and validate the wavelength monitoring and tracking concept. The developed concept verified that it can manage tracking of 32 wavelengths within a wavelength division multiplexing network. The developed concept presented in this paper can be used inside the transparent domains of networks to detect, identify and locate signal degradations in real-time, even sometimes to recognize the cause of the failure. Aside from the reduction of operational expenses due to the elimination of the need for operators at every site and skilled field technicians to isolate and repair faults, the developed

  20. Issues of integrating high-tech concepts into nuclear power plant operation

    International Nuclear Information System (INIS)

    Kisner, R.A.; Carter, R.J.; Lindsay, R.W.

    1990-01-01

    The stockpile of new ideas continues to grow for monitoring nuclear power plant parameters, characteristics, and vital signs and for controlling systems, subsystems, and components. This wide selection of monitoring and control software increases the difficulty of designing an integrated control room. As plant control room operators increase their reliance on computerized systems, including real-time plant data and data base systems, the integration of monitoring, diagnostics, and control software into uniform and seamless environment becomes imperative. A systematic approach to evaluating the usefulness of such high-tech control concepts is needed. This paper concentrates on methods to evaluate control concepts by assessing factors that determine a system's potential effectiveness within the context of the overall environment, including both human and machine components. Although not an in-depth study, this paper serves to outline several measures of utility. 21 refs., 3 figs., 2 tabs

  1. Implementation of the monitor concept

    Energy Technology Data Exchange (ETDEWEB)

    Gerstenberger, M.

    1982-01-01

    Sequential and parallel computer programs are contrasted, and the problems of implementing compilers are stated, with special reference to the Pascal language. Process and monitor data types in computer programming are described, various procedures are listed and the monitor concept is applied to a generator-user problem. A Pascal initiator program is listed. It is claimed that the monitor approach can yield lower fault levels than assembler or semaphore approaches. It is pointed out that monitors for program synchronisation are only applicable for common, and not for distributed, storage systems. 9 references.

  2. Concepts for operational period panel seal design at the Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    Hansen, F.D.; Lin, M.S.; Van Sambeek, L.L.

    1993-07-01

    Concepts for underground panel or drift seals at the Waste Isolation Pilot Plant are developed to satisfy sealing requirements of the operational period. The concepts are divided into two groups. In the ''NOW'' group, design concepts are considered in which a sleeve structure is installed in the panel access immediately after excavation and before waste is emplaced. In the ''LATER'' group, no special measures are taken during excavation or before waste emplacement; the seal is installed at a later date, perhaps up to 35 years after the drift is excavated. Three concepts are presented in both the NOW and LATER groups. A rigid sleeve, a yielding sleeve, and steel rings with inflatable tubes are proposed as NOW concepts. One steel ring concept and two concrete monoliths are proposed for seals emplaced in older drifts. Advantages and disadvantages are listed for each concept. Based on the available information, it appears most feasible to recommend a LATER concept using a concrete monolith as a preferred seal for the operational period. Each concept includes the potential of remedial grout and/or construction of a chamber that could be used for monitoring leakage from a closed panel during the operational period. Supporting in situ demonstrations of elements of the concepts are recommended

  3. Transportation System Concept of Operations

    Energy Technology Data Exchange (ETDEWEB)

    N. Slater-Thompson

    2006-08-16

    The Nuclear Waste Policy Act of 1982 (NWPA), as amended, authorized the DOE to develop and manage a Federal system for the disposal of SNF and HLW. OCRWM was created to manage acceptance and disposal of SNF and HLW in a manner that protects public health, safety, and the environment; enhances national and energy security; and merits public confidence. This responsibility includes managing the transportation of SNF and HLW from origin sites to the Repository for disposal. The Transportation System Concept of Operations is the core high-level OCRWM document written to describe the Transportation System integrated design and present the vision, mission, and goals for Transportation System operations. By defining the functions, processes, and critical interfaces of this system early in the system development phase, programmatic risks are minimized, system costs are contained, and system operations are better managed, safer, and more secure. This document also facilitates discussions and understanding among parties responsible for the design, development, and operation of the Transportation System. Such understanding is important for the timely development of system requirements and identification of system interfaces. Information provided in the Transportation System Concept of Operations includes: the functions and key components of the Transportation System; system component interactions; flows of information within the system; the general operating sequences; and the internal and external factors affecting transportation operations. The Transportation System Concept of Operations reflects OCRWM's overall waste management system policies and mission objectives, and as such provides a description of the preferred state of system operation. The description of general Transportation System operating functions in the Transportation System Concept of Operations is the first step in the OCRWM systems engineering process, establishing the starting point for the lower

  4. The Wettzell System Monitoring Concept and First Realizations

    Science.gov (United States)

    Ettl, Martin; Neidhardt, Alexander; Muehlbauer, Matthias; Ploetz, Christian; Beaudoin, Christopher

    2010-01-01

    Automated monitoring of operational system parameters for the geodetic space techniques is becoming more important in order to improve the geodetic data and to ensure the safety and stability of automatic and remote-controlled observations. Therefore, the Wettzell group has developed the system monitoring software, SysMon, which is based on a reliable, remotely-controllable hardware/software realization. A multi-layered data logging system based on a fanless, robust industrial PC with an internal database system is used to collect data from several external, serial, bus, or PCI-based sensors. The internal communication is realized with Remote Procedure Calls (RPC) and uses generative programming with the interface software generator idl2rpc.pl developed at Wettzell. Each data monitoring stream can be configured individually via configuration files to define the logging rates or analog-digital-conversion parameters. First realizations are currently installed at the new laser ranging system at Wettzell to address safety issues and at the VLBI station O Higgins as a meteorological data logger. The system monitoring concept should be realized for the Wettzell radio telescope in the near future.

  5. Integrating cost management and work management concepts for operations

    International Nuclear Information System (INIS)

    Vanditmars, C.

    1995-01-01

    Development of B C Gas Utility Limited's integrated work and cost management system was described, with emphasis on cost management without reliance on the financial systems, and standard costing and operational side benefits. The objectives of the system were identified as dynamic monitoring and control, and local empowerment. The concept underlying the two systems was explained in detail. In the case of the work management system the ability to manage all work in operations areas was stressed, along with its universal availability. Other benefits expected included improved resource utilization, improved productivity, better control of cost, improved revenue generation, superior customer service, a simplified financial system, and improved employee motivation through empowerment

  6. Epidemiological Concepts Regarding Disease Monitoring and Surveillance

    Directory of Open Access Journals (Sweden)

    Christensen Jette

    2001-03-01

    Full Text Available Definitions of epidemiological concepts regarding disease monitoring and surveillance can be found in textbooks on veterinary epidemiology. This paper gives a review of how the concepts: monitoring, surveillance, and disease control strategies are defined. Monitoring and surveillance systems (MO&SS involve measurements of disease occurrence, and the design of the monitoring determines which types of disease occurrence measures can be applied. However, the knowledge of the performance of diagnostic tests (sensitivity and specificity is essential to estimate the true occurrence of the disease. The terms, disease control programme (DCP or disease eradication programme (DEP, are defined, and the steps of DCP/DEP are described to illustrate that they are a process rather than a static MO&SS.

  7. The Comprehensive Approach Concept in Multinational Operations

    Directory of Open Access Journals (Sweden)

    Neag Mihai-Marcel

    2017-12-01

    Full Text Available The planning of operations is regulated by documents covering the participation of forces in military actions in a national and multinational context. The process of planning the operations has been adapted to conceptual planning progress. The concept of allied effect-based operations, which was an alternative to old national concepts, has undergone transformations, so the process of planning operations at allied level is currently based on the concept of a comprehensive approach, which is a strategic concept, do not give up effects. The term action-based operations has been replaced by the term “thought-based thinking” and belongs to the general concept of comprehensive approach. If the planning process meant the effects, so the main planning objectives were the effects, then the planning was based on concrete objectives, the effects being maintained for the economy of effort and maximizing efficiency, the main purpose of the effects being the evaluation of the operations. From this point of view, we consider that the concept has not been abandoned, what has changed, it was just the working method, the subject being still topical.

  8. 43 CFR 418.15 - Operations monitoring.

    Science.gov (United States)

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Operations monitoring. 418.15 Section 418... THE INTERIOR OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA Monitoring Diversions § 418.15 Operations monitoring. (a) The Bureau will work with the District to monitor Project...

  9. Concept for integrated environmental monitoring. Scientific approach

    Energy Technology Data Exchange (ETDEWEB)

    Haber, W [comp.; Schoenthaler, K; Kerner, H F; Koeppel, J; Spandau, L

    1998-09-01

    Despite considerable expenditures for environmental protection and intensified efforts in the areas of environmental research and monitoring, environmental damage increasingly occurs, sometimes with global effects, largely due to the lack of early diagnosis. In the past few years various institutions have therefore demanded improvements in environmental monitoring. The Council of Experts on Environmental Issues (`Rat von Sachverstaendigen fuer Umweltfragen`, SRU), in particular, in its `Environmental Report` of 1987 and in its Special Report on `General Ecological Environmental Monitoring` (1990) presented far-reaching demands for a nationwide ecological early warning system which should integrate the various local, regional, national, and even global monitoring levels, and which should encompass an environmental monitoring of entire ecosystems at representative locations. This is aimed at creating the prerequisites for - detection of long-term gradual environmental change, - confirmation of refutation of initial assumptions regarding the causes of these environmental changes, - permitting decisions on preventive actions to stabilize or improve environmental conditions and - making it possible to assess the success of environmental protection policies. This report includes an abbreviated version and documentation of the conference on the `Concept for Integrated Environmental Monitoring` and the final report `Specification of the Concept for Integrated Environmental Monitoring from the Perspective of Nature Conservation`. (orig.)

  10. Small Aircraft Transportation System, Higher Volume Operations Concept: Normal Operations

    Science.gov (United States)

    Abbott, Terence S.; Jones, Kenneth M.; Consiglio, Maria C.; Williams, Daniel M.; Adams, Catherine A.

    2004-01-01

    This document defines the Small Aircraft Transportation System (SATS), Higher Volume Operations (HVO) concept for normal conditions. In this concept, a block of airspace would be established around designated non-towered, non-radar airports during periods of poor weather. Within this new airspace, pilots would take responsibility for separation assurance between their aircraft and other similarly equipped aircraft. Using onboard equipment and procedures, they would then approach and land at the airport. Departures would be handled in a similar fashion. The details for this operational concept are provided in this document.

  11. Simulating Sustainment for an Unmanned Logistics System Concept of Operation in Support of Distributed Operations

    Science.gov (United States)

    2017-06-01

    SYSTEM CONCEPT OF OPERATION IN SUPPORT OF DISTRIBUTED OPERATIONS by Elle M. Ekman June 2017 Thesis...UNMANNED LOGISTICS SYSTEM CONCEPT OF OPERATION IN SUPPORT OF DISTRIBUTED OPERATIONS Elle M. Ekman Captain, United States Marine Corps B.S...Corps CO company CONEPS concept of employment CONOPS concept of operations CP command post CUAS cargo unmanned aircraft system DES discrete

  12. Monitoring of operational reliability of safety-related I and C subsystems at the Dukovany NPP

    International Nuclear Information System (INIS)

    Fuchs, P.; Sagl, P.; Zlamal, P.

    2007-01-01

    First, the situation existing in the data base in 1999, i.e. before the monitoring and the operational reliability monitoring concept were introduced, is highlighted. The technique of data processing is described with focus on the assessment of the relevancy of the records, component failure rate monitoring, estimation of basic statistical parameters, evaluation of the feasibility of component failure (or failure latency) detection, assessment of the mean time to repair, FMEA of the basic components (relays end measuring chains) to establish spurious signals and dangerous failure ratio. The reliability assessment of the system functions is based on structural reliability calculations (common cause failures not included). The outcomes from the operational reliability monitoring are presented in the form of a representative set of data, graphic charts and results of system function reliability assessment. Prospects for upgrading the I and C operational reliability monitoring system to the benefit of NPP Dukovany operating economy (life cycle costs evaluation, spare parts planning, RCM application) are outlined. (author)

  13. Mined Geologic Disposal System Concept of Operations

    International Nuclear Information System (INIS)

    Heidt, R.M.

    1995-01-01

    A Concept of Operations has been developed for the disposal of high-level radioactive waste in the potential geologic repository at Yucca Mountain. The Concept of Operations has been developed to document a cormion understanding of how the repository is to be operated. It is based on the repository architecture identified in the Initial Summary Report for Repository/Waste Package Advanced Conceptual Design and describes the operation of the repository from the initial receipt of waste through repository closure. Also described are operations for waste retrieval

  14. Transportation Management Center Concepts Of Operation, Implementation Guide

    Science.gov (United States)

    1999-12-01

    THE FOLLOWING DOCUMENT WILL ASSIST AGENCIES IN DEVELOPING A CONCEPT OF OPERATIONS BY PROVIDING INSIGHT INTO EACH OF THE TOPICS A CONCEPT OF OPERATIONS IS LIKELY TO CONTAIN. EXAMPLES OF OPERATIONAL CONSIDERATIONS FROM TMCS IN THE UNITED STATES AND CAN...

  15. Real time observation system for monitoring environmental impact on marine ecosystems from oil drilling operations.

    Science.gov (United States)

    Godø, Olav Rune; Klungsøyr, Jarle; Meier, Sonnich; Tenningen, Eirik; Purser, Autun; Thomsen, Laurenz

    2014-07-15

    Environmental awareness and technological advances has spurred development of new monitoring solutions for the petroleum industry. This paper presents experience from a monitoring program off Norway. To maintain operation within the limits of the government regulations Statoil tested a new monitoring concept. Multisensory data were cabled to surface buoys and transmitted to land via wireless communication. The system collected information about distribution of the drilling wastes and the welfare of the corals in relation to threshold values. The project experienced a series of failures, but the backup monitoring provided information to fulfil the requirements of the permit. The experience demonstrated the need for real time monitoring and how such systems enhance understanding of impacts on marine organisms. Also, drilling operations may improve by taking environmental information into account. The paper proposes to standardize and streamline monitoring protocols to maintain comparability during all phases of the operation and between drill sites. Copyright © 2014 Elsevier Ltd. All rights reserved.

  16. Condition Monitoring Of Operating Pipelines With Operational Modal Analysis Application

    Directory of Open Access Journals (Sweden)

    Mironov Aleksey

    2015-12-01

    Full Text Available In the petroleum, natural gas and petrochemical industries, great attention is being paid to safety, reliability and maintainability of equipment. There are a number of technologies to monitor, control, and maintain gas, oil, water, and sewer pipelines. The paper focuses on operational modal analysis (OMA application for condition monitoring of operating pipelines. Special focus is on the topicality of OMA for definition of the dynamic features of the pipeline (frequencies and mode shapes in operation. The research was conducted using two operating laboratory models imitated a part of the operating pipeline. The results of finite-element modeling, identification of pipe natural modes and its modification under the influence of virtual failure are discussed. The work considers the results of experimental research of dynamic behavior of the operating pipe models using one of OMA techniques and comparing dynamic properties with the modeled data. The study results demonstrate sensitivity of modal shape parameters to modification of operating pipeline technical state. Two strategies of pipeline repair – with continuously condition-based monitoring with proposed technology and without such monitoring, was discussed. Markov chain reliability models for each strategy were analyzed and reliability improvement factor for proposed technology of monitoring in compare with traditional one was evaluated. It is resumed about ability of operating pipeline condition monitoring by measuring dynamic deformations of the operating pipe and OMA techniques application for dynamic properties extraction.

  17. Small Aircraft Transportation System Higher Volume Operations Concept

    Science.gov (United States)

    Abbott, Terence S.; Consiglio, Maria C.; Baxley, Brian T.; Williams, Daniel M.; Jones, Kenneth M.; Adams, Catherine A.

    2006-01-01

    This document defines the Small Aircraft Transportation System (SATS) Higher Volume Operations concept. The general philosophy underlying this concept is the establishment of a newly defined area of flight operations called a Self-Controlled Area (SCA). Within the SCA, pilots would take responsibility for separation assurance between their aircraft and other similarly equipped aircraft. This document also provides details for a number of off-nominal and emergency procedures which address situations that could be expected to occur in a future SCA. The details for this operational concept along with a description of candidate aircraft systems to support this concept are provided.

  18. Operation monitor for plant equipment

    International Nuclear Information System (INIS)

    Kondo, Tetsufumi; Kanemoto, Shigeru.

    1991-01-01

    In a nuclear power plant, states of each of equipment in the plant are monitored accurately even under such a operation condition that the power is changed. That is, the fundamental idea is based on a model comparison method. A deviation between an output signal upon normal plant state obtained in a forecasting model device and that of the objective equipment in the plant are compared with a predetermined value. The result of the comparison is inputted to an alarm device to alarm the abnormality of the states of the equipment to an operator. The device of the present invention thus constituted can monitor the abnormality of the operation of equipment accurately even under such a condition that a power level fluctuates. As a result, it can remarkably contribute to mitigate operator's monitoring operation under the condition such as during load following operation. (I.S.)

  19. Mobility on Demand Operational Concept Report.

    Science.gov (United States)

    2017-09-10

    This operational concept report provides an overview of the Mobility on Demand (MOD) concept and its evolution, description of the MOD ecosystem in a supply and demand framework, and its stakeholders and enablers. Leveraging the MOD ecosystem framewo...

  20. Treatment of operational monitoring data

    International Nuclear Information System (INIS)

    Azevedo P, D. de; Marcondes T, J.

    1996-01-01

    From effective doses calculation models, published in norms and regulatory guides, the specific dose conversion factors for different installations are used on monitoring data. The monitoring data are achieved from many individual parameters and, in case there is no individual parameters, area monitoring data are used. With the objective of reducing occupational exposures, the results are evaluated in function of the pertinent norms. The measurements are analyzed also in function of the consistency of the data obtained from former similar operations. The results are saved as individual historical dose, in each worker annual dose of every work year. The other files are formed by determined operation individual doses, calculated per capita; dose rates are achieved from individual monitoring data and the averages of each operational function are calculated; dose rates are also obtained by area monitoring, and each workplace mean is calculated. These averages are compared with the correspondent annual dose equivalent limit fraction. The analysis of variance is applied to individuals dose rates and to workplace dose rates in order to verify statistical differences, the largest mean is compared to the remaining. The individual working time in a programmed operation is limited in order to avoid that the predicted dose equivalent of twelve months exceed the established annual limit. When this limit is predicted to be exceeded, the working time is re-programmed, with worker removing at the beginning of the operation or before the end of operation, keeping prevision below the limit. (authors). 7 refs

  1. Monitoring of operating processes

    International Nuclear Information System (INIS)

    Barry, R.F.

    1981-01-01

    Apparatus is described for monitoring the processes of a nuclear reactor to detect off-normal operation of any process and for testing the monitoring apparatus. The processes are evaluated by response to their paramters, such as temperature, pressure, etc. The apparatus includes a pair of monitoring paths or signal processing units. Each unit includes facilities for receiving on a time-sharing basis, a status binary word made up of digits each indicating the status of a process, whether normal or off-normal, and test-signal binary words simulating the status binary words. The status words and test words are processed in succession during successive cycles. During each cycle, the two units receive the same status word and the same test word. The test words simulate the status words both when they indicate normal operation and when they indicate off-normal operation. Each signal-processing unit includes a pair of memories. Each memory receives a status word or a test word, as the case may be, and converts the received word into a converted status word or a converted test word. The memories of each monitoring unit operate into a non-coincidence which signals non-coincidence of the converted word out of one memory of a signal-processing unit not identical to the converted word of the other memory of the same unit

  2. Tattoo-based noninvasive glucose monitoring: a proof-of-concept study.

    Science.gov (United States)

    Bandodkar, Amay J; Jia, Wenzhao; Yardımcı, Ceren; Wang, Xuan; Ramirez, Julian; Wang, Joseph

    2015-01-06

    We present a proof-of-concept demonstration of an all-printed temporary tattoo-based glucose sensor for noninvasive glycemic monitoring. The sensor represents the first example of an easy-to-wear flexible tattoo-based epidermal diagnostic device combining reverse iontophoretic extraction of interstitial glucose and an enzyme-based amperometric biosensor. In-vitro studies reveal the tattoo sensor's linear response toward physiologically relevant glucose levels with negligible interferences from common coexisting electroactive species. The iontophoretic-biosensing tattoo platform is reduced to practice by applying the device on human subjects and monitoring variations in glycemic levels due to food consumption. Correlation of the sensor response with that of a commercial glucose meter underscores the promise of the tattoo sensor to detect glucose levels in a noninvasive fashion. Control on-body experiments demonstrate the importance of the reverse iontophoresis operation and validate the sensor specificity. This preliminary investigation indicates that the tattoo-based iontophoresis-sensor platform holds considerable promise for efficient diabetes management and can be extended toward noninvasive monitoring of other physiologically relevant analytes present in the interstitial fluid.

  3. Component-Level Electronic-Assembly Repair (CLEAR) Operational Concept

    Science.gov (United States)

    Oeftering, Richard C.; Bradish, Martin A.; Juergens, Jeffrey R.; Lewis, Michael J.; Vrnak, Daniel R.

    2011-01-01

    This Component-Level Electronic-Assembly Repair (CLEAR) Operational Concept document was developed as a first step in developing the Component-Level Electronic-Assembly Repair (CLEAR) System Architecture (NASA/TM-2011-216956). The CLEAR operational concept defines how the system will be used by the Constellation Program and what needs it meets. The document creates scenarios for major elements of the CLEAR architecture. These scenarios are generic enough to apply to near-Earth, Moon, and Mars missions. The CLEAR operational concept involves basic assumptions about the overall program architecture and interactions with the CLEAR system architecture. The assumptions include spacecraft and operational constraints for near-Earth orbit, Moon, and Mars missions. This document addresses an incremental development strategy where capabilities evolve over time, but it is structured to prevent obsolescence. The approach minimizes flight hardware by exploiting Internet-like telecommunications that enables CLEAR capabilities to remain on Earth and to be uplinked as needed. To minimize crew time and operational cost, CLEAR exploits offline development and validation to support online teleoperations. Operational concept scenarios are developed for diagnostics, repair, and functional test operations. Many of the supporting functions defined in these operational scenarios are further defined as technologies in NASA/TM-2011-216956.

  4. Guidance concepts for time-based flight operations

    Science.gov (United States)

    Vicroy, Dan D.

    1990-01-01

    Airport congestion and the associated delays are severe in today's airspace system and are expected to increase. NASA and the FAA is investigating various methods of alleviating this problem through new technology and operational procedures. One concept for improving airspace productivity is time-based control of aircraft. Research to date has focused primarily on the development of time-based flight management systems and Air Traffic Control operational procedures. Flight operations may, however, require special onboard guidance in order to satisfy the Air Traffic Control imposed time constraints. The results are presented of a simulation study aimed at evaluating several time-based guidance concepts in terms of tracking performance, pilot workload, and subjective preference. The guidance concepts tested varied in complexity from simple digital time-error feedback to an advanced time-referenced-energy guidance scheme.

  5. I-880 Integrated Corridor Management Concept of Operation : Final Submittal: Concept of Operations for the I-880 Corridor in Oakland, California

    Science.gov (United States)

    2008-03-31

    This report describes the draft Concept of Operations that has been developed for the Integrated Corridor Mobility (ICM) program by the I-880 corridor team. The I-880 corridor team has defined this Concept of Operations (ConOps) based on two primary ...

  6. System-Oriented Runway Management Concept of Operations

    Science.gov (United States)

    Lohr, Gary W.; Atkins, Stephen

    2015-01-01

    This document describes a concept for runway management that maximizes the overall efficiency of arrival and departure operations at an airport or group of airports. Specifically, by planning airport runway configurations/usage, it focuses on the efficiency with which arrival flights reach their parking gates from their arrival fixes and departure flights exit the terminal airspace from their parking gates. In the future, the concept could be expanded to include the management of other limited airport resources. While most easily described in the context of a single airport, the concept applies equally well to a group of airports that comprise a metroplex (i.e., airports in close proximity that share resources such that operations at the airports are at least partially dependent) by including the coordination of runway usage decisions between the airports. In fact, the potential benefit of the concept is expected to be larger in future metroplex environments due to the increasing need to coordinate the operations at proximate airports to more efficiently share limited airspace resources. This concept, called System-Oriented Runway Management (SORM), is further broken down into a set of airport traffic management functions that share the principle that operational performance must be measured over the complete surface and airborne trajectories of the airport's arrivals and departures. The "system-oriented" term derives from the belief that the traffic management objective must consider the efficiency of operations over a wide range of aircraft movements and National Airspace System (NAS) dynamics. The SORM concept is comprised of three primary elements: strategic airport capacity planning, airport configuration management, and combined arrival/departure runway planning. Some aspects of the SORM concept, such as using airport configuration management1 as a mechanism for improving aircraft efficiency, are novel. Other elements (e.g., runway scheduling, which is a part

  7. The formal operations: Piaget’s concept, researches and main critics

    Directory of Open Access Journals (Sweden)

    Stepanović Ivana Ž.

    2004-01-01

    Full Text Available This paper deals with Piaget's concept of formal operations, formal operations researches and critics related to the concept. The first part of the work is dedicated to the formal operations concept. The main characteristics of formal operational thought and formal operations structure, as well as structure logical model are presented in that part of the work. The second part is a review of formal operational researches and it is divided in three parts: (1 problems of researches (2 characteristics of applied methodology and (3 author approaches as a specific research context. In the last part of the work the main critics of formal operations concept are presented and discussed.

  8. The concept of information support system for operational personnel of operating NPPs

    International Nuclear Information System (INIS)

    Dunaev, V.G.; Golovanov, V.V.

    1993-01-01

    The paper has been prepared on the materials of the concept developed by the order of ''Rosenergoatom'' concern. In the present paper the main definitions, the principal objectives and functions of the operator support system (OSS) are stated, a brief analysis of operation features of some existing operator information systems is presented, the main trends of development of operator information support system are given, the way and the sequence for implementation of the systems for operating NPPs are reviewed. In this proposed concept in the first place are considered the information support systems for the operators of the power unit main control rooms, however, the presented principles may be applied while designing information support systems for operators of other control rooms of NPP. 4 refs

  9. Reactivity monitoring during reactor-reloading operations

    International Nuclear Information System (INIS)

    Baumann, N.P.; Ahlfeld, C.F.; Ridgely, G.C.

    1983-01-01

    At the Savannah River Plant (SRP) reloading operations during shutdown present special considerations in reactivity monitoring and control. Large reactivity changes may occur during reloading operations because of the heterogeneous nature of some core designs. This paper describes an improved monitoring system

  10. Concept of a new method for fatigue monitoring of nuclear power plant components

    International Nuclear Information System (INIS)

    Zafosnik, M.; Cizelj, L.

    2007-01-01

    Fatigue is one of the well-understood aging mechanisms affecting mechanical components in many industrial facilities including nuclear power plants. Operational experience of nuclear power plants worldwide to date confirmed adequate design of safety related components against fatigue. In some cases however, for example when the plant life extension is envisioned, it may be very useful to monitor the remaining fatigue life of safety related components. Nuclear power plants components are classified into safety classes regarding their importance in mitigating the consequences of hypothetic accidents. Service life of components subjected to fatigue loading can be estimated with Usage Factor uk. A concept of the new method aiming both at monitoring the current state of the component and predicting its remaining lifetime in the life-extension conditions is presented. The method is based on determination of partial Usage Factor of components in which operating transients will be considered and compared to design transients. (author)

  11. Engineering Process Monitoring for Control Room Operation

    CERN Document Server

    Bätz, M

    2001-01-01

    A major challenge in process operation is to reduce costs and increase system efficiency whereas the complexity of automated process engineering, control and monitoring systems increases continuously. To cope with this challenge the design, implementation and operation of process monitoring systems for control room operation have to be treated as an ensemble. This is only possible if the engineering of the monitoring information is focused on the production objective and is lead in close collaboration of control room teams, exploitation personnel and process specialists. In this paper some principles for the engineering of monitoring information for control room operation are developed at the example of the exploitation of a particle accelerator at the European Laboratory for Nuclear Research (CERN).

  12. Tritium Room Air Monitor Operating Experience Review

    Energy Technology Data Exchange (ETDEWEB)

    L. C. Cadwallader; B. J. Denny

    2008-09-01

    Monitoring the breathing air in tritium facility rooms for airborne tritium is a radiological safety requirement and a best practice for personnel safety. Besides audible alarms for room evacuation, these monitors often send signals for process shutdown, ventilation isolation, and cleanup system actuation to mitigate releases and prevent tritium spread to the environment. Therefore, these monitors are important not only to personnel safety but also to public safety and environmental protection. This paper presents an operating experience review of tritium monitor performance on demand during small (1 mCi to 1 Ci) operational releases, and intentional airborne inroom tritium release tests. The tritium tests provide monitor operation data to allow calculation of a statistical estimate for the reliability of monitors annunciating in actual tritium gas airborne release situations. The data show a failure to operate rate of 3.5E-06/monitor-hr with an upper bound of 4.7E-06, a failure to alarm on demand rate of 1.4E-02/demand with an upper bound of 4.4E-02, and a spurious alarm rate of 0.1 to 0.2/monitor-yr.

  13. Stack Monitor Operating Experience Review

    International Nuclear Information System (INIS)

    Cadwallader, L.C.; Bruyere, S.A.

    2009-01-01

    Stack monitors are used to sense radioactive particulates and gases in effluent air being vented from rooms of nuclear facilities. These monitors record the levels and types of effluents to the environment. This paper presents the results of a stack monitor operating experience review of the U.S. Department of Energy (DOE) Occurrence Reporting and Processing System (ORPS) database records from the past 18 years. Regulations regarding these monitors are briefly described. Operating experiences reported by the U.S. DOE and in engineering literature sources were reviewed to determine the strengths and weaknesses of these monitors. Electrical faults, radiation instrumentation faults, and human errors are the three leading causes of failures. A representative 'all modes' failure rate is 1E-04/hr. Repair time estimates vary from an average repair time of 17.5 hours (with spare parts on hand) to 160 hours (without spare parts on hand). These data should support the use of stack monitors in any nuclear facility, including the National Ignition Facility and the international ITER project.

  14. A Risk-Based Multi-Objective Optimization Concept for Early-Warning Monitoring Networks

    Science.gov (United States)

    Bode, F.; Loschko, M.; Nowak, W.

    2014-12-01

    Groundwater is a resource for drinking water and hence needs to be protected from contaminations. However, many well catchments include an inventory of known and unknown risk sources which cannot be eliminated, especially in urban regions. As matter of risk control, all these risk sources should be monitored. A one-to-one monitoring situation for each risk source would lead to a cost explosion and is even impossible for unknown risk sources. However, smart optimization concepts could help to find promising low-cost monitoring network designs.In this work we develop a concept to plan monitoring networks using multi-objective optimization. Our considered objectives are to maximize the probability of detecting all contaminations and the early warning time and to minimize the installation and operating costs of the monitoring network. A qualitative risk ranking is used to prioritize the known risk sources for monitoring. The unknown risk sources can neither be located nor ranked. Instead, we represent them by a virtual line of risk sources surrounding the production well.We classify risk sources into four different categories: severe, medium and tolerable for known risk sources and an extra category for the unknown ones. With that, early warning time and detection probability become individual objectives for each risk class. Thus, decision makers can identify monitoring networks which are valid for controlling the top risk sources, and evaluate the capabilities (or search for least-cost upgrade) to also cover moderate, tolerable and unknown risk sources. Monitoring networks which are valid for the remaining risk also cover all other risk sources but the early-warning time suffers.The data provided for the optimization algorithm are calculated in a preprocessing step by a flow and transport model. Uncertainties due to hydro(geo)logical phenomena are taken into account by Monte-Carlo simulations. To avoid numerical dispersion during the transport simulations we use the

  15. GNSS-based operational monitoring devices for forest logging operation chains

    Directory of Open Access Journals (Sweden)

    Raimondo Gallo

    2013-09-01

    Full Text Available The first results of a new approach for implementing operational monitoring tool to control the performance of forest mechanisation chains are proposed and discussed. The solution is based on Global Navigation Satellite System (GNSS tools that are the core of a datalogging system that, in combination with a specific inference-engine, is able to analyse process times, work distances, forward speeds, vehicle tracking and number of working cycles in forest operations. As a consequence the operational monitoring control methods could provide an evaluation of the efficiency of the investigated forest operations. The study has monitored the performance of a tower yarder with crane and processor-head, during logging operations. The field surveys consisted on the installation of the GNSS device directly on the forest equipment for monitoring its movements. Simultaneously the field survey considered the integration of the GNSS information with a time study of work elements based on the continuous time methods supported by a time study board. Additionally, where possible, the onboard computer of the forest machine was also used in order to obtain additional information to be integrated to the GNSS data and the time study. All the recorded GNSS data integrated with the work elements study were thus post-processed through GIS analysis. The preliminary overview about the application of this approach on harvesting operations has permitted to assess a good feasibility of the use of GNSS in the relief of operative times in high mechanised forest chains. Results showed an easy and complete identification of the different operative cycles and elementary operations phases, with a maximum difference between the two methodologies of 10.32%. The use of GNSS installed on forest equipment, integrated with the inferenceengine and also with an interface for data communication or data storage, will permit an automatic or semi-automatic operational monitoring, improving

  16. Engineering Process Monitoring for Control Room Operation

    OpenAIRE

    Bätz, M

    2001-01-01

    A major challenge in process operation is to reduce costs and increase system efficiency whereas the complexity of automated process engineering, control and monitoring systems increases continuously. To cope with this challenge the design, implementation and operation of process monitoring systems for control room operation have to be treated as an ensemble. This is only possible if the engineering of the monitoring information is focused on the production objective and is lead in close coll...

  17. Nuclear-reactor remote-monitoring systems - concepts and implementations

    International Nuclear Information System (INIS)

    Rudolf, A.

    1987-01-01

    The paper presents general concepts and some examples of implemented nuclear-reactor remote-monitoring (RM) systems. Some functions and tasks of RM systems are demonstrated and three concepts are described in detail and assessed globally. Three examples of implemented RM systems are discussed using the Baden-Wurttemberg RM system for a description in greater detail. A brief prognosis of the future development of RM systems is made. (orig./DG) [de

  18. SENTINEL-1 RESULTS: SEA ICE OPERATIONAL MONITORING

    DEFF Research Database (Denmark)

    Toudal Pedersen, Leif; Saldo, Roberto; Fenger-Nielsen, Rasmus

    2015-01-01

    In the present paper we demonstrate the capabilities of the Sentinel-1 SAR data for operational sea-ice and iceberg monitoring. Most of the examples are drawn from the Copernicus Marine Environmental Monitoring Service (CMEMS) production.......In the present paper we demonstrate the capabilities of the Sentinel-1 SAR data for operational sea-ice and iceberg monitoring. Most of the examples are drawn from the Copernicus Marine Environmental Monitoring Service (CMEMS) production....

  19. Operation safety of complex industrial systems. Main concepts

    International Nuclear Information System (INIS)

    Zwingelstein, G.

    2009-01-01

    Operation safety consists in knowing, evaluating, foreseeing, measuring and mastering the technological system and human failures in order to avoid their impacts on health and people's safety, on productivity, and on the environment, and to preserve the Earth's resources. This article recalls the main concepts of operation safety: 1 - evolutions in the domain; 2 - failures, missions and functions of a system and of its components: functional failure, missions and functions, industrial processes, notions of probability; 3 - basic concepts and operation safety: reliability, unreliability, failure density, failure rate, relations between them, availability, maintainability, safety. (J.S.)

  20. Using Patterns for Multivariate Monitoring and Feedback Control of Linear Accelerator Performance: Proof-of-Concept Research

    International Nuclear Information System (INIS)

    Cordes, Gail Adele; Van Ausdeln, Leo Anthony; Velasquez, Maria Elena

    2002-01-01

    The report discusses preliminary proof-of-concept research for using the Advanced Data Validation and Verification System (ADVVS), a new INEEL software package, to add validation and verification and multivariate feedback control to the operation of non-destructive analysis (NDA) equipment. The software is based on human cognition, the recognition of patterns and changes in patterns in time-related data. The first project applied ADVVS to monitor operations of a selectable energy linear electron accelerator, and showed how the software recognizes in real time any deviations from the optimal tune of the machine. The second project extended the software method to provide model-based multivariate feedback control for the same linear electron accelerator. The projects successfully demonstrated proof-of-concept for the applications and focused attention on the common application of intelligent information processing techniques

  1. Concept of Operations for Data Fusion Visualization

    Energy Technology Data Exchange (ETDEWEB)

    T.R. McJunkin; R.L. Boring; M.A. McQueen; L.P. Shunn; J.L. Wright; D.I. Gertman; O. Linda; K. McCarty; M. Manic

    2011-09-01

    Situational awareness in the operations and supervision of a industrial system means that decision making entity, whether machine or human, have the important data presented in a timely manner. An optimal presentation of information such that the operator has the best opportunity accurately interpret and react to anomalies due to system degradation, failures or adversaries. Anticipated problems are a matter for system design; however, the paper will focus on concepts for situational awareness enhancement for a human operator when the unanticipated or unaddressed event types occur. Methodology for human machine interface development and refinement strategy is described for a synthetic fuels plant model. A novel concept for adaptively highlighting the most interesting information in the system and a plan for testing the methodology is described.

  2. Small Aircraft Transportation System, Higher Volume Operations Concept: Off-Nominal Operations

    Science.gov (United States)

    Abbott, Terence S.; Consiglio, Maria C.; Baxley, Brian T.; Williams, Daniel M.; Conway, Sheila R.

    2005-01-01

    This document expands the Small Aircraft Transportation System, (SATS) Higher Volume Operations (HVO) concept to include off-nominal conditions. The general philosophy underlying the HVO concept is the establishment of a newly defined area of flight operations called a Self-Controlled Area (SCA). During periods of poor weather, a block of airspace would be established around designated non-towered, non-radar airports. Aircraft flying enroute to a SATS airport would be on a standard instrument flight rules flight clearance with Air Traffic Control providing separation services. Within the SCA, pilots would take responsibility for separation assurance between their aircraft and other similarly equipped aircraft. Previous work developed the procedures for normal HVO operations. This document provides details for off-nominal and emergency procedures for situations that could be expected to occur in a future SCA.

  3. Concept of Operations for RCO SPO

    Science.gov (United States)

    Matessa, Michael; Strybel, Thomas; Vu, Kim; Battiste, Vernol; Schnell, Thomas

    2017-01-01

    Reduced crew operations (RCO) refers to the reduction of crew members flying long-haul or military operations with more than one pilot onboard. Single pilot operations (SPO) refers to flying a commercial transport aircraft with only one pilot on board the aircraft, assisted by advanced onboard automation andor ground operators providing piloting support services. Properly implemented, RCO/SPO could provide operating cost savings while maintaining a level of safety no less than conventional two-pilot commercial operations. A concept of operations (ConOps) for any paradigm describes the characteristics of its various components and their integration in a multi-dimensional design space. This paper presents key options for humanautomation function allocation being considered by NASA in its ongoing development of RCO/SPO ConOps.

  4. Mathematical model and algorithm of operation scheduling for monitoring situation in local waters

    Directory of Open Access Journals (Sweden)

    Sokolov Boris

    2017-01-01

    Full Text Available A multiple-model approach to description and investigation of control processes in regional maritime security system is presented. The processes considered in this paper were qualified as control processes of computing operations providing monitoring of the situation adding in the local water area and connected to relocation of different ships classes (further the active mobile objects (AMO. Previously developed concept of active moving object (AMO is used. The models describe operation of AMO automated monitoring and control system (AMCS elements as well as their interaction with objects-in-service that are sources or recipients of information being processed. The unified description of various control processes allows synthesizing simultaneously both technical and functional structures of AMO AMCS. The algorithm for solving the scheduling problem is described in terms of the classical theory of optimal automatic control.

  5. Facility operations transparency and remote monitoring

    International Nuclear Information System (INIS)

    Beddingfield, David

    2006-01-01

    Remote monitoring technologies offer many opportunities, not only to strengthen IAEA safeguards, but also to improve national, industrial and local oversight of various nuclear operations. Remote monitoring benefits in greater timeliness, reduced inspector presence and improved state-of-health awareness are well-known attributes. However, there is also the capability to organize data into a comprehensive knowledge of the 'normal operating envelope' of a facility. In considering future applications of remote monitoring there is also a need to develop a better understanding of the potential cost-savings versus higher up-front costs and potential long-term maintenance or upgrade costs. (author)

  6. US remote monitoring operational experience

    International Nuclear Information System (INIS)

    Dupree, S.A.; Sonnier, C.S.

    1997-01-01

    Under international partnerships and bilateral agreements with the U.S. Department of Energy, Sandia National Laboratories, other national laboratories, and international partner organizations have emplaced remote monitoring systems in nuclear facilities and laboratories in various parts of the world for the purpose of conducting field trials of remote monitoring. The purpose of the present report is to review the results from these field trials and draw general conclusions regarding the trials. Many thousands of hours of sensor and system operation have been logged, and data have been retrieved from many locations. In virtually all cases the system components have functioned as intended and data have been successfully collected and transmitted for review. Comparisons between front-end-triggered video and time-lapse video have shown that the triggered record has captured all relevant monitored operations at the various nuclear facilities included in the field trials. We believe the utility and functional reliability of remote monitoring for international safeguards has been shown. However, it should be kept in mind that openness and transparency, including some form of short-notice inspections, are likely to be prerequisites to the safeguards implementation of remote monitoring in any State

  7. Risk monitor - a tool for operational safety assessment risk monitor - user's manual

    International Nuclear Information System (INIS)

    Hari Prasad, M.; Vinod, Gopika; Saraf, R.K.; Ghosh, A.K.

    2006-06-01

    Probabilistic Safety Assessment has become a key tool as on today to identify and understand Nuclear Power Plant vulnerabilities. As a result of the availability of these PSA studies, there is a desire to use them to enhance plant safety and to operate the nuclear stations in the most efficient manner. Risk Monitor is a PC based tool, which computes the real time safety level and assists plant personnel to manage day-to-day activities. Risk Monitor is a PC based user friendly software tool used for modification and re-analysis of a nuclear Power plant. Operation of Risk Monitor is based on PSA methods for assisting in day to day applications. Risk Monitoring programs can assess the risk profile and are used to optimize the operation of Nuclear Power Plants with respect to a minimum risk level over the operating time. This report presents the background activities of Risk Monitor, its application areas and the step by step procedure for the user.to interact with the software. This software can be used with the PSA model of any Nuclear Power Plant. (author)

  8. Condition Monitoring Of Operating Pipelines With Operational Modal Analysis Application

    OpenAIRE

    Mironov Aleksey; Doronkin Pavel; Priklonsky Aleksander; Kabashkin Igor

    2015-01-01

    In the petroleum, natural gas and petrochemical industries, great attention is being paid to safety, reliability and maintainability of equipment. There are a number of technologies to monitor, control, and maintain gas, oil, water, and sewer pipelines. The paper focuses on operational modal analysis (OMA) application for condition monitoring of operating pipelines. Special focus is on the topicality of OMA for definition of the dynamic features of the pipeline (frequencies and mode shapes) i...

  9. Re-evaluation of monitored retrievable storage concepts

    International Nuclear Information System (INIS)

    Fletcher, J.F.; Smith, R.I.

    1989-04-01

    In 1983, as a prelude to the monitored retrievable storage (MRS) facility conceptual design, the Pacific Northwest Laboratory (PNL) conducted an evaluation for the US Department of Energy (DOE) that examined alternative concepts for storing spent LWR fuel and high- level wastes from fuel reprocessing. The evaluation was made considering nine concepts for dry away-from-reactor storage. The nine concepts evaluated were: concrete storage cask, tunnel drywell, concrete cask-in-trench, open-cycle vault, metal casks (transportable and stationary), closed-cycle vault, field drywell, and tunnel-rack vault. The purpose and scope of the re-evaluation did not require a repetition of the expert-based examinations used earlier. Instead, it was based on more detailed technical review by a small group, focusing on changes that had occurred since the initial evaluation was made. Two additional storage concepts--the water pool and the horizontal modular storage vault (NUHOMS system)--were ranked along with the original nine. The original nine concepts and the added two conceptual designs were modified as appropriate for a scenario with storage capacity for 15,000 MTU of spent fuel. Costs, area requirements, and technical and historical data pertaining to MRS storage were updated for each concept

  10. Re-evaluation of monitored retrievable storage concepts

    Energy Technology Data Exchange (ETDEWEB)

    Fletcher, J.F.; Smith, R.I.

    1989-04-01

    In 1983, as a prelude to the monitored retrievable storage (MRS) facility conceptual design, the Pacific Northwest Laboratory (PNL) conducted an evaluation for the US Department of Energy (DOE) that examined alternative concepts for storing spent LWR fuel and high- level wastes from fuel reprocessing. The evaluation was made considering nine concepts for dry away-from-reactor storage. The nine concepts evaluated were: concrete storage cask, tunnel drywell, concrete cask-in-trench, open-cycle vault, metal casks (transportable and stationary), closed-cycle vault, field drywell, and tunnel-rack vault. The purpose and scope of the re-evaluation did not require a repetition of the expert-based examinations used earlier. Instead, it was based on more detailed technical review by a small group, focusing on changes that had occurred since the initial evaluation was made. Two additional storage concepts--the water pool and the horizontal modular storage vault (NUHOMS system)--were ranked along with the original nine. The original nine concepts and the added two conceptual designs were modified as appropriate for a scenario with storage capacity for 15,000 MTU of spent fuel. Costs, area requirements, and technical and historical data pertaining to MRS storage were updated for each concept.

  11. Concept of Operations for Waste Transport, Emplacement, and Retrieval

    International Nuclear Information System (INIS)

    Raczka, Norman T.

    2001-01-01

    The preparation of this technical report has two objectives. The first objective is to discuss the base case concepts of waste transport, emplacement, and retrieval operations and evaluate these operations relative to a lower-temperature repository design. Aspects of the operations involved in waste transport, emplacement and retrieval may be affected by the lower-temperature operating schemes. This report evaluates the effects the lower-temperature alternatives may have on the operational concepts involved in emplacing and retrieving waste. The second objective is to provide backup material for the design description, in a traceable and defensible format, for Section 2 of the Waste Emplacement/Retrieval System Description Document

  12. Dynamic Weather Routes: A Weather Avoidance Concept for Trajectory-Based Operations

    Science.gov (United States)

    McNally, B. David; Love, John

    2011-01-01

    The integration of convective weather modeling with trajectory automation for conflict detection, trial planning, direct routing, and auto resolution has uncovered a concept that could help controllers, dispatchers, and pilots identify improved weather routes that result in significant savings in flying time and fuel burn. Trajectory automation continuously and automatically monitors aircraft in flight to find those that could potentially benefit from improved weather reroutes. Controllers, dispatchers, and pilots then evaluate reroute options to assess their suitability given current weather and traffic. In today's operations aircraft fly convective weather avoidance routes that were implemented often hours before aircraft approach the weather and automation does not exist to automatically monitor traffic to find improved weather routes that open up due to changing weather conditions. The automation concept runs in real-time and employs two keysteps. First, a direct routing algorithm automatically identifies flights with large dog legs in their routes and therefore potentially large savings in flying time. These are common - and usually necessary - during convective weather operations and analysis of Fort Worth Center traffic shows many aircraft with short cuts that indicate savings on the order of 10 flying minutes. The second and most critical step is to apply trajectory automation with weather modeling to determine what savings could be achieved by modifying the direct route such that it avoids weather and traffic and is acceptable to controllers and flight crews. Initial analysis of Fort Worth Center traffic suggests a savings of roughly 50% of the direct route savings could be achievable.The core concept is to apply trajectory automation with convective weather modeling in real time to identify a reroute that is free of weather and traffic conflicts and indicates enough time and fuel savings to be considered. The concept is interoperable with today

  13. A Framework for Human Performance Criteria for Advanced Reactor Operational Concepts

    Energy Technology Data Exchange (ETDEWEB)

    Jacques V Hugo; David I Gertman; Jeffrey C Joe

    2014-08-01

    This report supports the determination of new Operational Concept models needed in support of the operational design of new reactors. The objective of this research is to establish the technical bases for human performance and human performance criteria frameworks, models, and guidance for operational concepts for advanced reactor designs. The report includes a discussion of operating principles for advanced reactors, the human performance issues and requirements for human performance based upon work domain analysis and current regulatory requirements, and a description of general human performance criteria. The major findings and key observations to date are that there is some operating experience that informs operational concepts for baseline designs for SFR and HGTRs, with the Experimental Breeder Reactor-II (EBR-II) as a best-case predecessor design. This report summarizes the theoretical and operational foundations for the development of a framework and model for human performance criteria that will influence the development of future Operational Concepts. The report also highlights issues associated with advanced reactor design and clarifies and codifies the identified aspects of technology and operating scenarios.

  14. Concepts and Strategies for Transparency Monitoring of Nuclear Materials at the Back End of the Fuel/Weapons Cycle

    International Nuclear Information System (INIS)

    COSTIN, LAURENCE; DAVIES, PETER; PREGENZER, ARIAN L.

    1999-01-01

    Representatives of the Department of Energy, the national laboratories, the Waste Isolation Pilot Plant (WIPP), and others gathered to initiate the development of broad-based concepts and strategies for transparency monitoring of nuclear materials at the back end of the fuel/weapons cycle, including both geologic disposal and monitored retrievable storage. The workshop focused on two key questions: ''Why should we monitor?'' and ''What should we monitor?'' These questions were addressed by identifying the range of potential stakeholders, concerns that stakeholders may have, and the information needed to address those concerns. The group constructed a strategic framework for repository transparency implementation, organized around the issues of safety (both operational and environmental), diversion (assuring legitimate use and security), and viability (both political and economic). Potential concerns of the international community were recognized as the possibility of material diversion, the multinational impacts of potential radionuclide releases, and public and political perceptions of unsafe repositories. The workshop participants also identified potential roles that the WIPP may play as a monitoring technology development and demonstration test-bed facility. Concepts for WIPP'S potential test-bed role include serving as (1) an international monitoring technology and development testing facility, (2) an international demonstration facility, and (3) an education and technology exchange center on repository transparency technologies

  15. Computer monitoring of the RB reactor operation

    International Nuclear Information System (INIS)

    Milovanovic, S.; Pesic, M.; Milovanovic, T.

    1998-01-01

    Personal computer based acquisition system designed for monitoring of operation of the RB experimental reactor in the Institute of Nuclear Sciences 'Vinca' (former 'Boris Kidric') and experiences acquired during its use are shown in this paper. The monitoring covers generally all nuclear aspects of the reactor operation (start-up, nominal power operation, power changing, shut down and maintenance), but the emphasis is put on: real time (especially fast changing) reactivity measurement; supervising time dependence of the safety rods positions during shut down, and detection of position inaccuracy or failure operation of safety/control rods during the reactor operation or maintenance. (author)

  16. On the Distinction Between the Motivating Operation and Setting Event Concepts.

    Science.gov (United States)

    Nosik, Melissa R; Carr, James E

    2015-10-01

    In recent decades, behavior analysts have generally used two different concepts to speak about motivational influences on operant contingencies: setting event and motivating operation. Although both concepts still appear in the contemporary behavior-analytic literature and were designed to address the same antecedent phenomena, the concepts are quite different. The purpose of the present article is to describe and distinguish the concepts and to illustrate their current usage.

  17. Comparison of cask and drywell storage concepts for a monitored retrievable storage/interim storage system

    International Nuclear Information System (INIS)

    Rasmussen, D.E.

    1982-12-01

    The Department of Energy, through its Richland Operations Office is evaluating the feasibility, timing, and cost of providing a federal capability for storing the spent fuel, high-level wastes, and transuranic wastes that DOE may be obligated by law to manage until permanent waste disposal facilities are available. Three concepts utilizing a monitored retrievable storage/interim storage (MRS/IS) facility have been developed and analyzed. The first concept, co-location with a reprocessing plant, has been developed by staff of Allied General Nuclear Services. the second concept, a stand-alone facility, has been developed by staff of the General Atomic Company. The third concept, co-location with a deep geologic repository, has been developed by the Pacific Northwest Laboratory with the assistance of the Westinghouse Hanford Company and Kaiser Engineers. The objectives of this study are: to develop preconceptual designs for MRS/IS facilities: to examine various issues such as transportation of wastes, licensing of the facilities, and environmental concerns associated with operation of such facilities; and to estimate the life-cycle costs of the facilities when operated in response to a set of scenarios that define the quantities and types of waste requiring storage in specific time periods, generally spanning the years 1989 to 2037. Three scenarios are examined to develop estimates of life-cycle costs for the MRS/IS facilities. In the first scenario, the reprocessing plant is placed in service in 1989 and HLW canisters are stored until a repository is opened in the year 1998. Additional reprocessing plants and repositories are placed in service at intervals as needed to meet the demand. In the second scenario, the reprocessing plants are delayed in starting operations by 10 years, but the repositories open on schedule. In the third scenario, the repositories are delayed 10 years, but the reprocessing plants open on schedule

  18. Comparison of cask and drywell storage concepts for a monitored retrievable storage/interim storage system

    Energy Technology Data Exchange (ETDEWEB)

    Rasmussen, D.E.

    1982-12-01

    The Department of Energy, through its Richland Operations Office is evaluating the feasibility, timing, and cost of providing a federal capability for storing the spent fuel, high-level wastes, and transuranic wastes that DOE may be obligated by law to manage until permanent waste disposal facilities are available. Three concepts utilizing a monitored retrievable storage/interim storage (MRS/IS) facility have been developed and analyzed. The first concept, co-location with a reprocessing plant, has been developed by staff of Allied General Nuclear Services. the second concept, a stand-alone facility, has been developed by staff of the General Atomic Company. The third concept, co-location with a deep geologic repository, has been developed by the Pacific Northwest Laboratory with the assistance of the Westinghouse Hanford Company and Kaiser Engineers. The objectives of this study are: to develop preconceptual designs for MRS/IS facilities: to examine various issues such as transportation of wastes, licensing of the facilities, and environmental concerns associated with operation of such facilities; and to estimate the life-cycle costs of the facilities when operated in response to a set of scenarios that define the quantities and types of waste requiring storage in specific time periods, generally spanning the years 1989 to 2037. Three scenarios are examined to develop estimates of life-cycle costs for the MRS/IS facilities. In the first scenario, the reprocessing plant is placed in service in 1989 and HLW canisters are stored until a repository is opened in the year 1998. Additional reprocessing plants and repositories are placed in service at intervals as needed to meet the demand. In the second scenario, the reprocessing plants are delayed in starting operations by 10 years, but the repositories open on schedule. In the third scenario, the repositories are delayed 10 years, but the reprocessing plants open on schedule.

  19. HTTR operation monitoring with neural network in 30 days operation at 850degC

    International Nuclear Information System (INIS)

    Shimizu, Atsushi; Nabeshima, Kunihiko; Nakagawa, Shigeaki

    2009-01-01

    The High temperature engineering test reactor (HTTR) executed the rated power operation for 30days of the first time (850degC in temperature of the nuclear reactor outlet coolant) until March, 27th through April, 26th, 2007. In this operation, HTTR was observed according to the operation monitoring model with the neural network, and the detection performance of neural network was verified during slight changes of reactor state at rated power. The neural network used for the operation monitoring was an auto-associative network, where 31 input 31 outputs and the hidden layers were connected with 20 units by the hierarchy of three layer structure. Back-propagation algorithm was used for study rule. The operation monitoring model in initial study was constructed by using the power up data between 30% and rated power, which were randomly studied. The adjustment study during the operation monitoring changes the internal structure of the initial study model to follow the changes of reactor status, such as the burn-up of the nuclear fuel for the rated power operation. As a monitoring result, slight changes of reactor state by the control system operation were correctly detected, and the on-line application to an early anomaly diagnosis for HTTR facilities will be expected. (author)

  20. Core concept for long operating cycle simplified BWR (LSBWR)

    International Nuclear Information System (INIS)

    Kouji, Hiraiwa; Noriyuki, Yoshida; Mikihide, Nakamaru; Hideaki, Heki; Masanori, Aritomi

    2002-01-01

    An innovative core concept for a long operating cycle simplified BWR (LSBWR) is currently being developed under a Toshiba Corporation and Tokyo Institute of Technology joint study. In this core concept, the combination of enriched uranium oxide fuels and loose-pitched lattice is adopted for an easy application of natural circulation. A combination of enriched gadolinium and 0.7-times sized small bundle with peripheral-positioned gadolinium rod is also adopted as a key design concept for 15-year cycle operation. Based on three-dimensional nuclear and thermal hydraulic calculation, a nuclear design for fuel bundle has been determined. Core performance has been evaluated based on this bundle design and shows that thermal performance and reactivity characteristics meet core design criteria. Additionally, a control rod operation plan for an extension of control rod life has been successfully determined. (author)

  1. A new kind of monitor for ophthalmic operation

    International Nuclear Information System (INIS)

    Li, G; Wang, L L; Wang, Y; Lin, L; Jiang, W; Lu, Stephen C-Y; Besio, Walter G

    2005-01-01

    The integrity of the vision channel is often checked using VEP in order to avoiding damaging important tissue during an ophthalmic operation. But the measurement of before operations has strong side effects, it may damage the eyeball. We will introduce a new kind for monitoring ophthalmic operations in this paper. It uses visual electrical evoked potential to check the integrity of the vision access and it can monitor ophthalmic operations and avoid damaging any tissue, so it ensures the safety of the operation

  2. A new kind of monitor for ophthalmic operation

    Energy Technology Data Exchange (ETDEWEB)

    Li, G [College of Precision Instrument and Opto-Electronics Engineering, Tianjin University, Tianjin, 300072 (China); Wang, L L [College of Precision Instrument and Opto-Electronics Engineering, Tianjin University, Tianjin, 300072 (China); Wang, Y [College of Precision Instrument and Opto-Electronics Engineering, Tianjin University, Tianjin, 300072 (China); Lin, L [College of Precision Instrument and Opto-Electronics Engineering, Tianjin University, Tianjin, 300072 (China); Jiang, W [College of Precision Instrument and Opto-Electronics Engineering, Tianjin University, Tianjin, 300072 (China); Lu, Stephen C-Y [College of Precision Instrument and Opto-Electronics Engineering, Tianjin University, Tianjin, 300072 (China); Besio, Walter G [Biomedical Engineering Program, and Center for Biomedical Engineering and Rehabilitation Science Louisiana Tech. University, LA (United States)

    2005-01-01

    The integrity of the vision channel is often checked using VEP in order to avoiding damaging important tissue during an ophthalmic operation. But the measurement of before operations has strong side effects, it may damage the eyeball. We will introduce a new kind for monitoring ophthalmic operations in this paper. It uses visual electrical evoked potential to check the integrity of the vision access and it can monitor ophthalmic operations and avoid damaging any tissue, so it ensures the safety of the operation.

  3. Operating Experience Review of Tritium-in-Water Monitors

    Energy Technology Data Exchange (ETDEWEB)

    S. A. Bruyere; L. C. Cadwallader

    2011-09-01

    Monitoring tritium facility and fusion experiment effluent streams is an environmental safety requirement. This paper presents data on the operating experience of a solid scintillant monitor for tritium in effluent water. Operating experiences were used to calculate an average monitor failure rate of 4E-05/hour for failure to function. Maintenance experiences were examined to find the active repair time for this type of monitor, which varied from 22 minutes for filter replacement to 11 days of downtime while waiting for spare parts to arrive on site. These data support planning for monitor use; the number of monitors needed, allocating technician time for maintenance, inventories of spare parts, and other issues.

  4. Marketing Concept in the Function of Croatian Seaport Business Operation Improvement

    Directory of Open Access Journals (Sweden)

    Marinko Jurčević

    2006-05-01

    Full Text Available The application of the scope of marketing concept in modemmarket conditions of business operation is obligatory. Therole of marketing, as a business philosophy, is in the end unavoidablefor the improvement of business operation. It is impossibleto do business in market conditions and not to applybasic marketing rules. Therefore, the solution for the improvementof operation of Croatian seaports should be soughtthrough the systematic application of the scopes of marketingconcept. Marketing mix should be applied to the system of businessoperation of Croatian seaports, with a breakdown of allunderlying marketing functions based on the results of a systematicmarket research, and through monitoring not only ofthe current status but also of market trends and forecasts, listeningto customer demands and trends in this particularbranch of industry. In addition to the improvement of the qualityof transport services, through the analysis of the price policyand by strengthening the logistics of port operation, particularattention should be focused towards the systematic applicationof all promotion mix elements aiming at strengthening the identityand the image of Croatian ports. In the end, such businessand marketing-like thinking should result in economic developmentand business prosperity not only of ports but of maritimetransport as well; in other words, by the prosperity of theentire transport activity, as a prerequisite for the economic developmentof the Republic of Croatia.

  5. Operating System Concepts for Reconfigurable Computing: Review and Survey

    OpenAIRE

    Marcel Eckert; Dominik Meyer; Jan Haase; Bernd Klauer

    2016-01-01

    One of the key future challenges for reconfigurable computing is to enable higher design productivity and a more easy way to use reconfigurable computing systems for users that are unfamiliar with the underlying concepts. One way of doing this is to provide standardization and abstraction, usually supported and enforced by an operating system. This article gives historical review and a summary on ideas and key concepts to include reconfigurable computing aspects in operating systems. The arti...

  6. Continuous Air Monitor Operating Experience Review

    International Nuclear Information System (INIS)

    Cadwallader, L.C.; Bruyere, S.A.

    2008-01-01

    Continuous air monitors (CAMs) are used to sense radioactive particulates in room air of nuclear facilities. CAMs alert personnel of potential inhalation exposures to radionuclides and can also actuate room ventilation isolation for public and environmental protection. This paper presents the results of a CAM operating experience review of the DOE Occurrence Reporting and Processing System (ORPS) database from the past 18 years. Regulations regarding these monitors are briefly reviewed. CAM location selection and operation are briefly discussed. Operating experiences reported by the U.S. Department of Energy and in other literature sources were reviewed to determine the strengths and weaknesses of these monitors. Power losses, human errors, and mechanical issues cause the majority of failures. The average 'all modes' failure rate is 2.65E-05/hr. Repair time estimates vary from an average repair time of 9 hours (with spare parts on hand) to 252 hours (without spare parts on hand). These data should support the use of CAMs in any nuclear facility, including the National Ignition Facility and the international ITER experiment

  7. The concepts of developing mobile games for the operating system Android

    OpenAIRE

    Hartman, Jernej

    2011-01-01

    The diploma thesis describes the concepts behind developing mobile games for the Android operating system. The thesis first covers mobile games and everything related to them, from mobile operating systems to mobile devices. It also describes how mobile games work and compares different concepts regarding their implementation. It then presents and covers the target mobile operating system of this thesis – the Android – describing its architecture and the operation of applications using this o...

  8. Operations Monitoring Assistant System Design

    Science.gov (United States)

    1986-07-01

    Logic. Artificial Inteligence 25(1)::75-94. January.18. 41 -Nils J. Nilsson. Problem-Solving Methods In Artificli Intelligence. .klcG raw-Hill B3ook...operations monitoring assistant (OMA) system is designed that combines operations research, artificial intelligence, and human reasoning techniques and...KnowledgeCraft (from Carnegie Group), and 5.1 (from Teknowledze). These tools incorporate the best methods of applied artificial intelligence, and

  9. Radiological monitoring related to the operation of PUSPATI's Triga Reactor

    International Nuclear Information System (INIS)

    Fatimah Mohamad Amin; Mohamad Yusof Mohamad Ali; Lau How Mooi; Idris Besar.

    1983-01-01

    Reactor operation is one of the main activities carried out at the Tun Ismail Atomic Research Centre (PUSPATI) which requires radiological monitoring. This paper describes the programme for radiological monitoring which is related to the operation of the 1 MW Triga MK II research reactor which was commissioned in July, 1982. This programme includes monitoring of the radiation and contamination levels of the reactor and its associated facilities and environmental monitoring of PUSPATI's site and its environs. The data presented in this paper covers the period between 1982 to 1983 which includes both the pre-operational and operational phases of the monitoring programme. (author)

  10. Deep Borehole Disposal Concept: Development of Universal Canister Concept of Operations

    Energy Technology Data Exchange (ETDEWEB)

    Rigali, Mark J. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Applied Systems Analysis and Research; Price, Laura L. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Applied Systems Analysis and Research

    2016-08-01

    This report documents key elements of the conceptual design for deep borehole disposal of radioactive waste to support the development of a universal canister concept of operations. A universal canister is a canister that is designed to be able to store, transport, and dispose of radioactive waste without the canister having to be reopened to treat or repackage the waste. This report focuses on the conceptual design for disposal of radioactive waste contained in a universal canister in a deep borehole. The general deep borehole disposal concept consists of drilling a borehole into crystalline basement rock to a depth of about 5 km, emplacing WPs in the lower 2 km of the borehole, and sealing and plugging the upper 3 km. Research and development programs for deep borehole disposal have been ongoing for several years in the United States and the United Kingdom; these studies have shown that deep borehole disposal of radioactive waste could be safe, cost effective, and technically feasible. The design concepts described in this report are workable solutions based on expert judgment, and are intended to guide follow-on design activities. Both preclosure and postclosure safety were considered in the development of the reference design concept. The requirements and assumptions that form the basis for the deep borehole disposal concept include WP performance requirements, radiological protection requirements, surface handling and transport requirements, and emplacement requirements. The key features of the reference disposal concept include borehole drilling and construction concepts, WP designs, and waste handling and emplacement concepts. These features are supported by engineering analyses.

  11. Flight Test Evaluation of an Unmanned Aircraft System Traffic Management (UTM) Concept for Multiple Beyond-Visual-Line-of-Sight (BVLOS) Operations

    Science.gov (United States)

    Johnson, Marcus; Jung, Jaewoo; Rios, Joseph; Mercer, Joey; Homola, Jeffrey; Prevot, Thomas; Mulfinger, Daniel; Kopardekar, Parimal

    2017-01-01

    Many applications of small Unmanned Aircraft System (UAS) have been envisioned. These include surveillance of key assets such as pipelines, rail, or electric wires, deliveries, search and rescue, traffic monitoring, videography, and precision agriculture. These operations are likely to occur in the same airspace in the presence of many static and dynamic constraints such as airports, and high wind areas. Therefore, operations of small UAS need to be managed to ensure safety and operation efficiency is maintained. NASA has advanced a concept for UAS Traffic Management (UTM) and has initiated a research effort to refine that concept and develop operational and system requirements. A UTM research platform is in development and flight test activities to evaluate core functions and key assumptions focusing exclusively on UAS operations in different environments are underway. This seminar will present lessons learned from a recent flight test focused on enabling operations of multiple UAS in lower-risk environments within and beyond visual line of sight (BVLOS).

  12. Integrated Air Surveillance Concept of Operations

    Science.gov (United States)

    2011-11-01

    Intelligence (SIGINT) Human Intelligence (HUMINT) Measurement and Signature Intelligence (MASINT) Open Source Intelligence ( OSINT ) In...Office of Management and Budget OpsCon: Operational Concept OSINT : Open Source Intelligence OSTP: Office of Science & Technology Policy Pt–to-Pt...data, all- source intelligence , law enforcement information and relevant open - source data from public and private sectors,

  13. Structural health monitoring of power plant components based on a local temperature measurement concept

    International Nuclear Information System (INIS)

    Rudolph, Juergen; Bergholz, S.; Hilpert, R.; Jouan, B.; Goetz, A.

    2012-01-01

    The fatigue assessment of power plant components based on fatigue monitoring approaches is an essential part of the integrity concept and modern lifetime management. It is comparable to structural health monitoring approaches in other engineering fields. The methods of fatigue evaluation of nuclear power plant components based on realistic thermal load data measured on the plant are addressed. In this context the Fast Fatigue Evaluation (FFE) and Detailed Fatigue Calculation (DFC) of nuclear power plant components are parts of the three staged approach to lifetime assessment and lifetime management of the AREVA Fatigue Concept (AFC). The three stages Simplified Fatigue Estimation (SFE), Fast Fatigue Evaluation (FFE) and Detailed Fatigue Calculation (DFC) are characterized by increasing calculation effort and decreasing degree of conservatism. Their application is case dependent. The quality of the fatigue lifetime assessment essentially depends on one hand on the fatigue model assumptions and on the other hand on the load data as the basic input. In the case of nuclear power plant components thermal transient loading is most fatigue relevant. Usual global fatigue monitoring approaches rely on measured data from plant instrumentation. As an extension, the application of a local fatigue monitoring strategy (to be described in detail within the scope of this paper) paves the way of delivering continuously (nowadays at a frequency of 1 Hz) realistic load data at the fatigue relevant locations. Methods of qualified processing of these data are discussed in detail. Particularly, the processing of arbitrary operational load sequences and the derivation of representative model transients is discussed. This approach related to realistic load-time histories is principally applicable for all fatigue relevant components and ensures a realistic fatigue evaluation. (orig.)

  14. Toward an integrated system concept for monitoring and evaluation of safety culture

    International Nuclear Information System (INIS)

    Makino, Maomi; Sakaue, Takeharu

    2004-01-01

    The concept of ''nuclear safety culture'' has been advocated and has been much discussed internationally by INSAG (The International Nuclear Safety Advisory Group) under IAEA (the International Atomic Energy Agency) and other institutions since Chernobyl accident. On the safety front, Japan had maintained an excellent track record in nuclear power operations throughout the 1990s. However, there have been a series of new type of problems strongly implying degradation of safety culture, e.g., Monju accident, fire and explosion accident at an Asphalt Solidification Process Facility at Tokai, falsification of annealing data at nuclear power plants (NPP), another data falsification for transport cask of spent fuel and JCO criticality accident. Then the TEPCO (Tokyo Electric Power Company) issue was revealed in 2002. Triggered by this issue, the Nuclear and Industrial Safety Agency (NISA) has been implementing a variety of improvements, one of which was the establishment of a study group in 2003, which invited experts from other fields as well as from nuclear-related industries, to study on how to implement safety culture sufficiently and possible recommendations. Subjects such as the followings piled in the study report will indicate leading keys in case it is going to realize such efforts: ''Foundation of safety culture is a quality management'' and ''Realistic and scientific technique is necessary for the evaluation of safety culture''. In order to respond to these requests, JNES have been advancing the development toward an Integrated System Concept for Monitoring and Evaluation of Safety Culture. This paper describes the outline of the study results reported by the study group and then introduces one of subsystems, SCEST, structuring the integrated system concept for Monitoring and Evaluation of Safety Culture. (author)

  15. Proof of Concept for a Simple Smartphone Sky Monitor

    Science.gov (United States)

    Kantamneni, Abhilash; Nemiroff, R. J.; Brisbois, C.

    2013-01-01

    We present a novel approach of obtaining a cloud and bright sky monitor by using a standard smartphone with a downloadable app. The addition of an inexpensive fisheye lens can extend the angular range to the entire sky visible above the device. A preliminary proof of concept image shows an optical limit of about visual magnitude 5 for a 70-second exposure. Support science objectives include cloud monitoring in a manner similar to the more expensive cloud monitors in use at most major astronomical observatories, making expensive observing time at these observatories more efficient. Primary science objectives include bright meteor tracking, bright comet tracking, and monitoring the variability of bright stars. Citizen science objectives include crowd sourcing of many networked sky monitoring smartphones typically in broader support of many of the primary science goals. The deployment of a citizen smartphone array in an active science mode could leverage the sky monitoring data infrastructure to track other non-visual science opportunities, including monitoring the Earth's magnetic field for the effects of solar flares and exhaustive surface coverage for strong seismic events.

  16. Indicators to monitor NPP operational safety performance

    International Nuclear Information System (INIS)

    Gomez-Cobo, Ana

    2002-01-01

    Since December 1995 the IAEA activities on safety performance indicators focused on the elaboration of a framework for the establishment of an operational safety performance indicator programme. The development of this framework began with the consideration of the concept of NPP operational safety performance and the identification of operational safety attributes. For each operational safety attribute, overall indicators, envisioned as providing an overall evaluation of relevant aspects of safety performance, were established. Associated with each overall indicator is a level of strategic indicators intended to provide a bridge from overall to specific indicators. Finally each strategic indicator was supported by a set of specific indicators, which represent quantifiable measures of performance. The programme development was enhanced by pilot plant studies, conducted over a 15 month period from January 1998 to March 1999. The result of all this work is compiled in the IAEA-TECDOC-1141, to be published shortly. This paper presents a summary of this IAEA TECDOC. It describes the operational safety performance indicator framework proposed and discusses the results of and lessons learned from the pilot studies. Despite the efforts described, it is clear that additional research is still necessary in areas such as plant-specific adaptation of proposed frameworks in order to suit individual data collection systems and plant characteristics, indicator selection, indicator definition, goal setting, action thresholds, analysis of trends, indicator display systems, analysis of overall safety performance (i.e., aggregation or combination of indicators), safety culture indicators, qualitative indicators, and use of additional indicators to address issues such as industrial safety attitude and performance, staff welfare, and environmental compliance. This is the rationale for a new IAEA Coordinated Research Project on 'Development and application of indicators to monitor NPP

  17. Contrast in low-cost operational concepts for orbiting satellites

    Science.gov (United States)

    Walyus, Keith D.; Reis, James; Bradley, Arthur J.

    2002-12-01

    Older spacecraft missions, especially those in low Earth orbit with telemetry intensive requirements, required round-the-clock control center staffing. The state of technology relied on control center personnel to continually examine data, make decisions, resolve anomalies, and file reports. Hubble Space Telescope (HST) is a prime example of this description. Technological advancements in hardware and software over the last decade have yielded increases in productivity and operational efficiency, which result in lower cost. The re-engineering effort of HST, which has recently concluded, utilized emerging technology to reduce cost and increase productivity. New missions, of which NASA's Transition Region and Coronal Explorer Satellite (TRACE) is an example, have benefited from recent technological advancements and are more cost-effective than when HST was first launched. During its launch (1998) and early orbit phase, the TRACE Flight Operations Team (FOT) employed continually staffed operations. Yet once the mission entered its nominal phase, the FOT reduced their staffing to standard weekday business hours. Operations were still conducted at night and during the weekends, but these operations occurred autonomously without compromising their high standards for data collections. For the HST, which launched in 1990, reduced cost operations will employ a different operational concept, when the spacecraft enters its low-cost phase after its final servicing mission in 2004. Primarily due to the spacecraft"s design, the HST Project has determined that single-shift operations will introduce unacceptable risks for the amount of dollars saved. More importantly, significant cost-savings can still be achieved by changing the operational concept for the FOT, while still maintaining round-the-clock staffing. It"s important to note that the low-cost solutions obtained for one satellite may not be applicable for other satellites. This paper will contrast the differences between

  18. Condition Monitoring for Roller Bearings of Wind Turbines Based on Health Evaluation under Variable Operating States

    Directory of Open Access Journals (Sweden)

    Lei Fu

    2017-10-01

    Full Text Available Condition monitoring (CM is used to assess the health status of wind turbines (WT by detecting turbine failure and predicting maintenance needs. However, fluctuating operating conditions cause variations in monitored features, therefore increasing the difficulty of CM, for example, the frequency-domain analysis may lead to an inaccurate or even incorrect prediction when evaluating the health of the WT components. In light of this challenge, this paper proposed a method for the health evaluation of WT components based on vibration signals. The proposed approach aimed to reduce the evaluation error caused by the impact of the variable operating condition. First, the vibration signal was decomposed into a set of sub-signals using variational mode decomposition (VMD. Next, the sub-signal energy and the probability distribution were obtained and normalized. Finally, the concept of entropy was introduced to evaluate the health condition of a monitored object to provide an effective guide for maintenance. In particular, the health evaluation for CM was based on a performance review over a range of operating conditions, rather than at a certain single operating condition. Experimental investigations were performed which verified the efficiency of the evaluation method, as well as a comparison with the previous method.

  19. Advancing satellite operations with intelligent graphical monitoring systems

    Science.gov (United States)

    Hughes, Peter M.; Shirah, Gregory W.; Luczak, Edward C.

    1993-01-01

    For nearly twenty-five years, spacecraft missions have been operated in essentially the same manner: human operators monitor displays filled with alphanumeric text watching for limit violations or other indicators that signal a problem. The task is performed predominately by humans. Only in recent years have graphical user interfaces and expert systems been accepted within the control center environment to help reduce operator workloads. Unfortunately, the development of these systems is often time consuming and costly. At the NASA Goddard Space Flight Center (GSFC), a new domain specific expert system development tool called the Generic Spacecraft Analyst Assistant (GenSAA) has been developed. Through the use of a highly graphical user interface and point-and-click operation, GenSAA facilitates the rapid, 'programming-free' construction of intelligent graphical monitoring systems to serve as real-time, fault-isolation assistants for spacecraft analysts. Although specifically developed to support real-time satellite monitoring, GenSAA can support the development of intelligent graphical monitoring systems in a variety of space and commercial applications.

  20. 40 CFR 60.265 - Monitoring of operations.

    Science.gov (United States)

    2010-07-01

    ... Production Facilities § 60.265 Monitoring of operations. (a) The owner or operator of any electric submerged... side of the transformer. The device must have an accuracy of ±5 percent over its operating range. (c... owner or operator of an electric submerged arc furnace that is equipped with a water cooled cover which...

  1. Operational readiness of filtered air discharge monitoring systems

    International Nuclear Information System (INIS)

    Lafortune, J.F.; Jamieson, T.J.

    1993-08-01

    An assessment of the operational readiness of the Filtered Air Discharge (FAD) Stack Monitoring systems, installed in Canadian CANDU nuclear power plants, was performed in this project. Relevant Canadian and foreign standards and regulatory requirements have been reviewed and documentation on FAD stack monitoring system design, operation, testing and maintenance have been assessed to identify likely causes and potential failures of FAD stack monitoring systems and their components under both standby and accident conditions. Recommendations have also been provided in this report for design and performance review guidelines for CANDU stations. A case study of the FAD stack monitoring system at Pickering NGS is also documented in this report

  2. Rapid-L Operator-Free Fast Reactor Concept Without Any Control Rods

    International Nuclear Information System (INIS)

    Kambe, Mitsuru; Tsunoda, Hirokazu; Mishima, Kaichiro; Iwamura, Takamichi

    2003-01-01

    The 200-kW(electric) uranium-nitride-fueled lithium-cooled fast reactor concept 'RAPID-L' to achieve highly automated reactor operation has been demonstrated. RAPID-L is designed for a lunar base power system. It is one of the variants of the RAPID (Refueling by All Pins Integrated Design) fast reactor concept, which enables quick and simplified refueling. The essential feature of the RAPID concept is that the reactor core consists of an integrated fuel assembly instead of conventional fuel subassemblies. In this small-size reactor core, 2700 fuel pins are integrated and encased in a fuel cartridge. Refueling is conducted by replacing a fuel cartridge. The reactor can be operated without refueling for up to 10 yr.Unique challenges in reactivity control systems design have been addressed in the RAPID-L concept. The reactor has no control rod but involves the following innovative reactivity control systems: lithium expansion modules (LEM) for inherent reactivity feedback, lithium injection modules (LIM) for inherent ultimate shutdown, and lithium release modules (LRM) for automated reactor startup. All these systems adopt 6 Li as a liquid poison instead of B 4 C rods. In combination with LEMs, LIMs, and LRMs, RAPID-L can be operated without an operator. This reactor concept is also applicable to the terrestrial fast reactors. In this paper, the RAPID-L reactor concept and its transient characteristics are presented

  3. Manual on environmental monitoring in normal operation

    International Nuclear Information System (INIS)

    1966-01-01

    Many establishments handling radioactive materials produce, and to some extent also discharge, radioactive waste as part of their normal operation. The radiation doses to which members of the public may be exposed during such operation must remain below the stipulated level. The purpose of this manual is to provide technical guidance for setting up programmes of routine environmental monitoring in the vicinity of nuclear establishment. The annex gives five examples of routine environmental monitoring programmes currently in use: these have been indexed separately.

  4. Water Recovery System Architecture and Operational Concepts to Accommodate Dormancy

    Science.gov (United States)

    Carter, Layne; Tabb, David; Anderson, Molly

    2017-01-01

    Future manned missions beyond low Earth orbit will include intermittent periods of extended dormancy. The mission requirement includes the capability for life support systems to support crew activity, followed by a dormant period of up to one year, and subsequently for the life support systems to come back online for additional crewed missions. NASA personnel are evaluating the architecture and operational concepts that will allow the Water Recovery System (WRS) to support such a mission. Dormancy could be a critical issue due to concerns with microbial growth or chemical degradation that might prevent water systems from operating properly when the crewed mission began. As such, it is critical that the water systems be designed to accommodate this dormant period. This paper identifies dormancy issues, concepts for updating the WRS architecture and operational concepts that will enable the WRS to support the dormancy requirement.

  5. A distributed planning concept for Space Station payload operations

    Science.gov (United States)

    Hagopian, Jeff; Maxwell, Theresa; Reed, Tracey

    1994-01-01

    The complex and diverse nature of the payload operations to be performed on the Space Station requires a robust and flexible planning approach. The planning approach for Space Station payload operations must support the phased development of the Space Station, as well as the geographically distributed users of the Space Station. To date, the planning approach for manned operations in space has been one of centralized planning to the n-th degree of detail. This approach, while valid for short duration flights, incurs high operations costs and is not conducive to long duration Space Station operations. The Space Station payload operations planning concept must reduce operations costs, accommodate phased station development, support distributed users, and provide flexibility. One way to meet these objectives is to distribute the planning functions across a hierarchy of payload planning organizations based on their particular needs and expertise. This paper presents a planning concept which satisfies all phases of the development of the Space Station (manned Shuttle flights, unmanned Station operations, and permanent manned operations), and the migration from centralized to distributed planning functions. Identified in this paper are the payload planning functions which can be distributed and the process by which these functions are performed.

  6. Monitoring of MNSR operation by measuring subcritical photoneutron flux

    International Nuclear Information System (INIS)

    Haddad, Kh.; Alsomel, N.

    2011-01-01

    Passive nondestructive assay methods are used to monitor the reactor's operation. It is required for nuclear regulatory, calculation validation and safeguards purposes. So, it plays a vital role in the safety and security of the nuclear plants. The possibility of MNSR operation monitoring by measuring the subcritical state photoneutron flux were investigated in this work. The photoneutron flux is induced by the fuels hard gamma radiation in the beryllium reflector. Theoretical formulation and experimental tests were performed. The results show that within a specified cooling time range, the photoneutron flux is induced by a single dominant hard gamma emitter such as 117 Cd (activation product) and 140 Ba ( 140 La fission product). This phenomenon was utilized to monitor the cooling time and the operation neutron flux during the last campaign. Thus a passive nondestructive assay method is proposed with regard to the reactor operation's monitoring.

  7. Design Concept of Human Interface System for Risk Monitoring for Proactive Trouble Prevention

    Energy Technology Data Exchange (ETDEWEB)

    Yoshikawa, Hidekazu; Yang, Ming; Zhang, Zhijian; Hashim, Muhammad [Harbin Engineering University, Harbin (China); Lind, Morten [Technical University of Denmark, Kongens Lyngby (Djibouti); Tamayama, Kiyoshi; Okusa, Kyoichi [Japan Atomic Energy Agency, Tsuruga (Japan)

    2011-08-15

    A new concept is first proposed of distributed human interface system to integrate both operation and maintenance of nuclear power plant. Then, a method of constructing human interface system is introduced by integrating the plant knowledge database system based on Multilevel Flow Model (MFM) with the risk monitor to watch Defense-in Depth plant safety functions. The proposed concept is applied for a liquid metal fast reactor Monju and necessary R and D subjects are reviewed to realize human interface system for the maintenance work in Monju plant. Because of using high temperature liquid sodium as reactor coolant in Monju plant, the maintenance for Monju should utilize more automated equipment of remote control and robotics than that of light water reactor. It is necessary to design optimum task allocation between human and automated machine as the requisites for good communication design of human interface systems to support the collaboration work between workers at local workplace and the main control room. In this paper, the general issues are reviewed on how to configure the whole human interface system for helping proactive trouble prevention and risk evaluation on the basis of the presented target plant model before the concrete proposition of the hardware and software systems development to be used by both the staffs of operation and maintenance of NPP.

  8. Design Concept of Human Interface System for Risk Monitoring for Proactive Trouble Prevention

    International Nuclear Information System (INIS)

    Yoshikawa, Hidekazu; Yang, Ming; Zhang, Zhijian; Hashim, Muhammad; Lind, Morten; Tamayama, Kiyoshi; Okusa, Kyoichi

    2011-01-01

    A new concept is first proposed of distributed human interface system to integrate both operation and maintenance of nuclear power plant. Then, a method of constructing human interface system is introduced by integrating the plant knowledge database system based on Multilevel Flow Model (MFM) with the risk monitor to watch Defense-in Depth plant safety functions. The proposed concept is applied for a liquid metal fast reactor Monju and necessary R and D subjects are reviewed to realize human interface system for the maintenance work in Monju plant. Because of using high temperature liquid sodium as reactor coolant in Monju plant, the maintenance for Monju should utilize more automated equipment of remote control and robotics than that of light water reactor. It is necessary to design optimum task allocation between human and automated machine as the requisites for good communication design of human interface systems to support the collaboration work between workers at local workplace and the main control room. In this paper, the general issues are reviewed on how to configure the whole human interface system for helping proactive trouble prevention and risk evaluation on the basis of the presented target plant model before the concrete proposition of the hardware and software systems development to be used by both the staffs of operation and maintenance of NPP

  9. Operational results from the LHC luminosity monitors

    Energy Technology Data Exchange (ETDEWEB)

    Miyamoto, R.; Ratti, A.; Matis, H.S.; Stezelberger, T.; Turner, W.C.; Yaver, H.; Bravin, E.

    2011-03-28

    The luminosity monitors for the high luminosity regions in the LHC have been operating to monitor and optimize the luminosity since 2009. The device is a gas ionization chamber inside the neutral particle absorber 140 m from the interaction point and monitors showers produced by high energy neutral particles from the collisions. It has the ability to resolve the bunch-by-bunch luminosity as well as to survive the extreme level of radiation in the nominal LHC operation. We present operational results of the device during proton and lead ion operations in 2010 and make comparisons with measurements of experiments. The Large Hadron Collider (LHC) at CERN can accelerate proton and lead ion beams to 7 TeV and 547 TeV and produce collisions of these particles. Luminosity measures performance of the LHC and is particularly important for experiments in high luminosity interaction points (IPs), ATLAS (IP1) and CMS (IP5). To monitor and optimize the luminosities of these IPs, BRAN (Beam RAte Neutral) detectors [1, 2] have been installed and operating since the beginning of the 2009 operation [3]. A neutral particle absorber (TAN) protects the D2 separation dipole from high energy forward neutral particles produced in the collisions [4]. These neutral particles produce electromagnetic and hadronic showers inside the TAN and their energy flux is proportional to the collision rate and hence to the luminosity. The BRAN detector is an Argon gas ionization chamber installed inside the TANs on both sides of the IP1 and IP5 and monitors the relative changes in the luminosity by detecting the ionization due to these showers. When the number of collisions per bunch crossing (multiplicity) is small, the shower rate inside the TAN is also proportional to the luminosity. Hence, the detector is designed to operate by measuring either the shower rate (counting mode for low and intermediate luminosities) or the average shower flux (pulse height mode for high luminosities). The detector is

  10. Operating System Concepts for Reconfigurable Computing: Review and Survey

    Directory of Open Access Journals (Sweden)

    Marcel Eckert

    2016-01-01

    Full Text Available One of the key future challenges for reconfigurable computing is to enable higher design productivity and a more easy way to use reconfigurable computing systems for users that are unfamiliar with the underlying concepts. One way of doing this is to provide standardization and abstraction, usually supported and enforced by an operating system. This article gives historical review and a summary on ideas and key concepts to include reconfigurable computing aspects in operating systems. The article also presents an overview on published and available operating systems targeting the area of reconfigurable computing. The purpose of this article is to identify and summarize common patterns among those systems that can be seen as de facto standard. Furthermore, open problems, not covered by these already available systems, are identified.

  11. Joint Urban Operations Joint Integrating Concept

    Science.gov (United States)

    2007-07-23

    concept could lead to a systems-engineering approach to urban operations based on the misconception that urban ecologies can be treated as if they...profits at the cost of irreparable societal and ecological destruction. The firms conduct a series of focus groups to determine what countermessages...Group, moving directly behind Task Force 1, quickly assemble “pop-up” prefabricated encampments to create temporary refugee camps off the main axis of

  12. Condition Monitoring of Machinery in Non-Stationary Operations : Proceedings of the Second International Conference "Condition Monitoring of Machinery in Non-Stationnary Operations"

    CERN Document Server

    Bartelmus, Walter; Chaari, Fakher; Zimroz, Radoslaw; Haddar, Mohamed

    2012-01-01

    Condition monitoring of machines in non-stationary operations (CMMNO) can be seen as the major challenge for research in the field of machinery diagnostics. Condition monitoring of machines in non-stationary operations is the title of the presented book and the title of the Conference held in Hammamet - Tunisia March 26 – 28, 2012. It is the second conference under this title, first took place in Wroclaw - Poland , March 2011. The subject CMMNO comes directly from industry needs and observation of real objects. Most monitored and diagnosed objects used in industry works in non-stationary operations condition. The non-stationary operations come from fulfillment of machinery tasks, for which they are designed for. All machinery used in different kind of mines, transport systems, vehicles like: cars, buses etc, helicopters, ships and battleships and so on work in non-stationary operations. The papers included in the book are shaped by the organizing board of the conference and authors of the papers. The papers...

  13. HALE UAS Concept of Operations. Version 3.0

    Science.gov (United States)

    2006-01-01

    This document is a system level Concept of Operations (CONOPS) from the perspective of future High Altitude Long Endurance (HALE) Unmanned Aircraft Systems (UAS) service providers and National Airspace System (NAS) users. It describes current systems (existing UAS), describes HALE UAS functions and operations to be performed (via sample missions), and offers insight into the user s environment (i.e., the UAS as a system of systems). It is intended to be a source document for NAS UAS operational requirements, and provides a construct for government agencies to use in guiding their regulatory decisions, architecture requirements, and investment strategies. Although it does not describe the technical capabilities of a specific HALE UAS system (which do, and will vary widely), it is intended to aid in requirements capture and to be used as input to the functional requirements and analysis process. The document provides a basis for development of functional requirements and operational guidelines to achieve unrestricted access into the NAS. This document is an FY06 update to the FY05 Access 5 Project-approved Concept of Operations document previously published in the Public Domain on the Access 5 open website. This version is recommended to be approved for public release also. The updates are a reorganization of materials from the previous version with the addition of an updated set of operational requirements, inclusion of sample mission scenarios, and identification of roles and responsibilities of interfaces within flight phases.

  14. Federal Radiological Monitoring and Assessment Center Monitoring Manual Volume 1, Operations

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Aerial Measurement Systems

    2012-07-31

    The Monitoring division is primarily responsible for the coordination and direction of: Aerial measurements to delineate the footprint of radioactive contaminants that have been released into the environment. Monitoring of radiation levels in the environment; Sampling to determine the extent of contaminant deposition in soil, water, air and on vegetation; Preliminary field analyses to quantify soil concentrations or depositions; and Environmental and personal dosimetry for FRMAC field personnel, during a Consequence Management Response Team (CMRT) and Federal Radiological Monitoring and Assessment Center (FRMAC) response. Monitoring and sampling techniques used during CM/FRMAC operations are specifically selected for use during radiological emergencies where large numbers of measurements and samples must be acquired, analyzed, and interpreted in the shortest amount of time possible. In addition, techniques and procedures are flexible so that they can be used during a variety of different scenarios; e.g., accidents involving releases from nuclear reactors, contamination by nuclear waste, nuclear weapon accidents, space vehicle reentries, or contamination from a radiological dispersal device. The Monitoring division also provides technicians to support specific Health and Safety Division activities including: The operation of the Hotline; FRMAC facility surveys; Assistance with Health and Safety at Check Points; and Assistance at population assembly areas which require support from the FRMAC. This volume covers deployment activities, initial FRMAC activities, development and implementation of the monitoring and assessment plan, the briefing of field teams, and the transfer of FRMAC to the EPA.

  15. Potential of future operational missions sentinel 4 and 5 for atmospheric monitoring and science (CAMELOT).

    Science.gov (United States)

    Levelt, P. F.; Veefkind, J. P.

    2010-05-01

    Dedicated atmospheric chemistry observations from space have been made for over 30 years now, starting with the SBUV and TOMS measurements of the ozone layer. Since then huge progress has been made, improving the accuracy of the measurements, extending the amount of constituents, and by sensing not only the stratosphere, but the last five to ten years also the troposphere. The potential to operational monitor the atmosphere, following the meteorological community, came within reach. At the same time, the importance for society of regular operational environmental measurements, related to the ozone layer, air quality and climate change, became apparent, amongst others resulting in the EU initiative Global Monitoring for Environment and Security (GMES) In order to prepare the operational missions in the context of the GMES, ESA took the initiative to further study the user requirements for the Sentinel 4 and 5 (precursor) missions. The Sentinel 4 and 5 (precursor) missions are dedicated operational missions to monitor the atmospheric composition in the 2013-2020 timeframe and onward. The user requirements for the sentinel missions focus on monitoring the atmosphere from an environmental point of view (ozone layer, air quality and climate). ESA's CAMELOT (Composition of the Atmospheric Mission concEpts and SentineL Observation Techniques) study is the follow-on study to ESA's CAPACITY study finished in 2005. The general objective of the CAMELOT study is to further contribute to the definition of the air quality and climate protocol monitoring parts of the GMES Sentinel 4 and 5 missions. CAMELOT consists of a large European consortium formed by 9 European institutes (KNMI (lead), RAL, U.Leicester, SRON, FMI, BIRA-IASB, CNR-IFAC,NOVELTIS and RIU-U.Koeln). In the presentation an overview will give a short overview of the CAMELOT study, including some specific results for combined retrievals, cloud statistics for different orbit geometries and retrievals for several orbit

  16. Examples for monitoring at GKN

    International Nuclear Information System (INIS)

    Bartonicek, J.; Alt, M.; Manke, A.

    1999-01-01

    On-line monitoring is carried out in order to ensure integrity of the various plant components of relevance to safety of operation. The original quality of the components has to be safeguarded over their service life by appropriate redundant measures. This belongs to the legal requirements laid down in nuclear engineering codes. Components are damaged in operation only by real operating loads, or effects of the environment conditions. This is why monitoring of the causes of damage mechanisms is given high priority in any concept for ensuring component integrity. The results accumulated so far through the monitoring methods applied at GKN have shown that non-specified, or unspecifiable, loading conditions may be induced by plant operation, and that the available information on the effects, as obtained by in-service inspections, should be supplemented by information drawn from destructive inspections. The comprehensive concept for safeguarding component integrity at GKN is discussed. (orig./CB) [de

  17. AIRCRAFT MAINTENANCE ENABLED JOINT CONCEPT FOR ENTRY OPERATIONS

    Science.gov (United States)

    2017-04-06

    The “off-equipment” AFSs have been reduced as well. Gone are the backshops of Electrical/Environmental, Hydraulics , Avionics, and Armament. The 5th...area (A2/AD) denial battlefronts. While this is a great concept, more must be done to reduce the logistics footprint, improve logistics agility and... reduce costs of logistics operations. Logisticians must always find a way to enable the operations that our Services require. Thesis From the

  18. Periodic Virtual Cell Manufacturing (P-VCM) - Concept, Design and Operation

    NARCIS (Netherlands)

    Slomp, Jannes; Krushinsky, Dimitry; Caprihan, Rahul

    2011-01-01

    This paper presents and discusses the concept of Periodic Virtual Cell Manufacturing (P-VCM). After giving an illustrative example of the operation and design complexity of a P-VCM system, we present an industrial case to study the applicability of the concept. The illustrative example and the

  19. Initial Concept of Operations for Full Management by Trajectory

    Science.gov (United States)

    Fernandes, Alicia D.; Atkins, Steve; Leiden, Ken; Kaler, Curt; Evans, Mark; Bell, Alan; Kilbourne, Todd; Jackson, Michael

    2017-01-01

    This document describes Management by Trajectory (MBT), a concept for future air traffic management (ATM) in which flights are assigned four-dimensional trajectories (4DTs) through a negotiation process between the Federal Aviation Administration (FAA) and flight operators that respects the flight operator's goals while complying with National Airspace System (NAS) constraints.

  20. Targets of operation monitoring

    International Nuclear Information System (INIS)

    Wenger, H.

    1997-01-01

    The condition monitoring system of a nuclear power plant should be an assurance for the user and the authorities that the safety of the installation constantly corresponds to the nominal condition. As soon as deviations from these conditions occur, it should quickly provide fundamentals for corrective measures. It contributes to a high degree of availability of the installation and makes safe and economical operation throughout the whole life of the installation possible. (author) 1 fig

  1. CVISN operational and architectural compatibility handbook (COACH). Part 1, Operational concept and top-level design checklists

    Science.gov (United States)

    1999-04-22

    The CVISN Operational and Architectural Compatibility Handbook (COACH) provides a comprehensive checklist of what is required to conform with the Commercial Vehicle Information Systems and Networks (CVISN) operational concepts and architecture. It is...

  2. High Altitude Venus Operations Concept Trajectory Design, Modeling and Simulation

    Science.gov (United States)

    Lugo, Rafael A.; Ozoroski, Thomas A.; Van Norman, John W.; Arney, Dale C.; Dec, John A.; Jones, Christopher A.; Zumwalt, Carlie H.

    2015-01-01

    A trajectory design and analysis that describes aerocapture, entry, descent, and inflation of manned and unmanned High Altitude Venus Operation Concept (HAVOC) lighter-than-air missions is presented. Mission motivation, concept of operations, and notional entry vehicle designs are presented. The initial trajectory design space is analyzed and discussed before investigating specific trajectories that are deemed representative of a feasible Venus mission. Under the project assumptions, while the high-mass crewed mission will require further research into aerodynamic decelerator technology, it was determined that the unmanned robotic mission is feasible using current technology.

  3. Operational Monitoring of Data Production at KNMI

    Science.gov (United States)

    van de Vegte, John; Kwidama, Anecita; van Moosel, Wim; Oosterhof, Rijk; de Wit de Wit, Ronny; Klein Ikkink, Henk Jan; Som de Cerff, Wim; Verhoef, Hans; Koutek, Michal; Duin, Frank; van der Neut, Ian; verhagen, Robert; Wollerich, Rene

    2016-04-01

    Within KNMI a new fully automated system for monitoring the KNMI operational data production systems is being developed: PRISMA (PRocessflow Infrastructure Surveillance and Monitoring Application). Currently the KNMI operational (24/7) production systems consist of over 60 applications, running on different hardware systems and platforms. They are interlinked for the production of numerous data products, which are delivered to internal and external customers. Traditionally these applications are individually monitored by different applications or not at all; complicating root cause and impact analysis. Also, the underlying hardware and network is monitored via an isolated application. Goal of the PRISMA system is to enable production chain monitoring, which enables root cause analysis (what is the root cause of the disruption) and impact analysis (what downstream products/customers will be effected). The PRISMA system will make it possible to reduce existing monitoring applications and provides one interface for monitoring the data production. For modeling and storing the state of the production chains a graph database is used. The model is automatically updated by the applications and systems which are to be monitored. The graph models enables root cause and impact analysis. In the PRISMA web interface interaction with the graph model is accomplished via a graphical representation. The presentation will focus on aspects of: • Modeling real world computers, applications, products to a conceptual model; • Architecture of the system; • Configuration information and (real world) event handling of the to be monitored objects; • Implementation rules for root cause and impact analysis. • How PRISMA was developed (methodology, facts, results) • Presentation of the PRISMA system as it now looks and works

  4. Lay Worker Health Literacy: A Concept Analysis and Operational Definition.

    Science.gov (United States)

    Cadman, Kathleen Paco

    2017-10-01

    The concept of lay worker health literacy is created by concurrently analyzing and synthesizing two intersecting concepts, lay workers and health literacy. Articulation of this unique intersection is the result of implementing a simplified Wilson's Concept Analysis Procedure. This process incorporates the following components: a) selecting a concept, b) determining the aims/purposes of analysis, c) identifying all uses of the concept, d) determining defining attributes, e) identifying a model case, f) identifying borderline, related, contrary, and illegitimate cases, g) identifying antecedents and consequences, and h) defining empirical referents. Furthermore, as current literature provides no operational definition for lay worker health literacy, one is created to contribute cohesion to the concept. © 2017 Wiley Periodicals, Inc.

  5. Acoustic and vibration monitoring systems and its place in the general conception of NPP diagnostics

    International Nuclear Information System (INIS)

    Dmitriev, V.; Kudryavtsev, B.; Morozov, S.; Finkel, B.

    1993-01-01

    Concept of diagnostics as a matter is an identification of defects and malfunctions in operating equipment by analyzing some data containing the information about these defects or malfunctions, but received without their direct observation. The direct observation of some parameters may be impossible in principle (for example, coolant saturation temperature), or because of inaccessibility for its measuring (for example, temperature of fuel elements), or because of the absence of a suitable sensor at a proper place. And, on the contrary, in some cases there is too much information for its simple interpretation. This report describes various monitoring systems of reactor components.Application is made to a pwr type reactor

  6. Concept for creating program-technical complex of safety monitoring with system of safety parameters presentation functions on the basis of routine WWER-1000 systems

    International Nuclear Information System (INIS)

    Dunaev, V.G.; Tarasov, M. V.; Povarov, P.V.

    2005-01-01

    Prerequisites of creating the software-hardware complex for reactor safety monitoring on the Volgodonsk NPP are analyzed and generalized. The concept of this complex is based on functions of the safety parameters presentation system. It will serve as an interface between operator and technological process and give to operator a possibility to estimate quickly the state of the safety of the nuclear power unit. The complex will be created on the basis of routine reactor monitoring and control systems intended for the WWER-1000 reactor. In addition to existing soft- and hard-wares for reactor monitoring and for analysis of technological archive, it is proposed to create and connect in parallel the new software-hardware complex which ensures calculation and presentation of generalized factors of reactor safety [ru

  7. Development and verification of ground-based tele-robotics operations concept for Dextre

    Science.gov (United States)

    Aziz, Sarmad

    2013-05-01

    The Special Purpose Dextreous Manipulator (Dextre) is the latest addition to the on-orbit segment of the Mobile Servicing System (MSS); Canada's contribution to the International Space Station (ISS). Launched in March 2008, the advanced two-armed robot is designed to perform various ISS maintenance tasks on robotically compatible elements and on-orbit replaceable units using a wide variety of tools and interfaces. The addition of Dextre has increased the capabilities of the MSS, and has introduced significant complexity to ISS robotics operations. While the initial operations concept for Dextre was based on human-in-the-loop control by the on-orbit astronauts, the complexities of robotic maintenance and the associated costs of training and maintaining the operator skills required for Dextre operations demanded a reexamination of the old concepts. A new approach to ISS robotic maintenance was developed in order to utilize the capabilities of Dextre safely and efficiently, while at the same time reducing the costs of on-orbit operations. This paper will describe the development, validation, and on-orbit demonstration of the operations concept for ground-based tele-robotics control of Dextre. It will describe the evolution of the new concepts from the experience gained from the development and implementation of the ground control capability for the Space Station Remote Manipulator System; Canadarm 2. It will discuss the various technical challenges faced during the development effort, such as requirements for high positioning accuracy, force/moment sensing and accommodation, failure tolerance, complex tool operations, and the novel operational tools and techniques developed to overcome them. The paper will also describe the work performed to validate the new concepts on orbit and will discuss the results and lessons learned from the on-orbit checkout and commissioning of Dextre using the newly developed tele-robotics techniques and capabilities.

  8. Man/terminal interaction evaluation of computer operating system command and control service concepts. [in Spacelab

    Science.gov (United States)

    Dodson, D. W.; Shields, N. L., Jr.

    1978-01-01

    The Experiment Computer Operating System (ECOS) of the Spacelab will allow the onboard Payload Specialist to command experiment devices and display information relative to the performance of experiments. Three candidate ECOS command and control service concepts were reviewed and laboratory data on operator performance was taken for each concept. The command and control service concepts evaluated included a dedicated operator's menu display from which all command inputs were issued, a dedicated command key concept with which command inputs could be issued from any display, and a multi-display concept in which command inputs were issued from several dedicated function displays. Advantages and disadvantages are discussed in terms of training, operational errors, task performance time, and subjective comments of system operators.

  9. Alternative concepts for spent fuel storage basin expansion at Morris Operation

    International Nuclear Information System (INIS)

    Graf, W.A. Jr.; King, C.E.; Miller, G.P.; Shadel, F.H.; Sloat, R.J.

    1980-08-01

    Alternative concepts for increasing basin capabilities for storage of spent fuel at the Morris Operation have been defined in a series of simplified flow diagrams and equipment schematics. Preliminary concepts have been outlined for (1) construction alternatives for an add-on basin, (2) high-density baskets for storage of fuel bundles or possible consolidated fuel rods in the existing or add-on basins, (3) modifications to the existing facility for increasing cask handling and fuel receiving capabilities and (4) accumulation, treatment and disposal of radwastes from storage operations. Preliminary capital and operating costs have been prepared and resource and schedule requirements for implementing the concepts have been estimated. The basin expansion alternatives would readily complement potential dry storage projects at the site in an integrated multi-stage program that could provide a total storage capacity of up to 7000 tonnes of spent fuel

  10. Plant operation state monitoring system

    International Nuclear Information System (INIS)

    Sakai, Masanori; Babuchi, Katsumi; Arato, Toshiaki

    1994-01-01

    The system of the present invention accurately monitors a plant operation state of a plant, such as a nuclear power plant and a thermal power plant by using high temperature water, based on water quality informations. That is, water quality informations for the objective portion by using an electrochemical water quality sensor disposed in the objective portion to be monitored in the plant are continuously extracted for a predetermined period of time. Water quality is evaluated based on the extracted information. Obtained results for water quality evaluation and predetermined reference values of the plant operation handling are compared. Necessary part among the results of the measurement is displayed or recorded. The predetermined period of time described above is a period that the water quality information reaches at least a predetermined value or a period that the predetermined value is estimated by the water quality information, and it is defined as a period capable of measuring the information for three months continuously. The measurement is preferably conducted continuously in a period up to each periodical inspection on about every one year. (I.S.)

  11. Geospace monitoring for space weather research and operation

    Directory of Open Access Journals (Sweden)

    Nagatsuma Tsutomu

    2017-01-01

    Full Text Available Geospace, a space surrounding the Earth, is one of the key area for space weather. Because geospace environment dynamically varies depending on the solar wind conditions. Many kinds of space assets are operating in geospace for practical purposes. Anomalies of space assets are sometimes happened because of space weather disturbances in geospace. Therefore, monitoring and forecasting of geospace environment is very important tasks for NICT's space weather research and development. To monitor and to improve forecasting model, fluxgate magnetometers and HF radars are operated by our laboratory, and its data are used for our research work, too. We also operate real-time data acquisition system for satellite data, such as DSCOVR, STEREO, and routinely received high energy particle data from Himawari-8. Based on these data, we are monitoring current condition of geomagnetic disturbances, and that of radiation belt. Using these data, we have developed empirical models for relativistic electron flux at GEO and inner magnetosphere. To provide userfriendly information , we are trying to develop individual spacecraft anomaly risk estimation tool based on combining models of space weather and those of spacecraft charging, Current status of geospace monitoring, forecasting, and research activities are introduced.

  12. Geospace monitoring for space weather research and operation

    Science.gov (United States)

    Nagatsuma, Tsutomu

    2017-10-01

    Geospace, a space surrounding the Earth, is one of the key area for space weather. Because geospace environment dynamically varies depending on the solar wind conditions. Many kinds of space assets are operating in geospace for practical purposes. Anomalies of space assets are sometimes happened because of space weather disturbances in geospace. Therefore, monitoring and forecasting of geospace environment is very important tasks for NICT's space weather research and development. To monitor and to improve forecasting model, fluxgate magnetometers and HF radars are operated by our laboratory, and its data are used for our research work, too. We also operate real-time data acquisition system for satellite data, such as DSCOVR, STEREO, and routinely received high energy particle data from Himawari-8. Based on these data, we are monitoring current condition of geomagnetic disturbances, and that of radiation belt. Using these data, we have developed empirical models for relativistic electron flux at GEO and inner magnetosphere. To provide userfriendly information , we are trying to develop individual spacecraft anomaly risk estimation tool based on combining models of space weather and those of spacecraft charging, Current status of geospace monitoring, forecasting, and research activities are introduced.

  13. Regulatory perspectives of concept assessment

    International Nuclear Information System (INIS)

    Flavelle, Peter A.

    1987-09-01

    The Atomic Energy Control Board is the head agency for the regulatory review of the Assessment of the Canadian Concept for Nuclear Fuel Waste Disposal being done by Atomic Energy of Canada Limited and Ontario Hydro. This paper describes the regulatory perspective of how the Concept Assessment could demonstrate the feasibility of a disposal conforming to regulatory requirements. The long-term aspects of Concept Assessment encourage the use of various predictive techniques for different time scales. Each technique will have a different potential for establishing confidence in the predictions. The predicted performance of a facility during operation should have a very high confidence, as it can be based on standard engineering calculations and the predictions can be validated later by monitoring during operation. The predictions of the transient period following closure of the facility should achieve a medium level of confidence, since they can be based on extrapolations of predictions of operational performance, using models that can be calibrated with monitoring data and with averaged input data derived from natural analog studies. Predictions based on fundamental processes will have a medium level of confidence when made to intermediate times after closure. Long-term predictions using generic or typical input data or Monte Carlo calculations of simplified models will have the least confidence and yet they can still contribute to the confidence that the disposal concept will conform to regulatory requirements

  14. Real-Time Spatial Monitoring of Vehicle Vibration Data as a Model for TeleGeoMonitoring Systems

    OpenAIRE

    Robidoux, Jeff

    2005-01-01

    This research presents the development and proof of concept of a TeleGeoMonitoring (TGM) system for spatially monitoring and analyzing, in real-time, data derived from vehicle-mounted sensors. In response to the concern for vibration related injuries experienced by equipment operators in surface mining and construction operations, the prototype TGM system focuses on spatially monitoring vehicle vibration in real-time. The TGM vibration system consists of 3 components: (1) Data Acquisition ...

  15. Operating Experiences of a Loss of Voltage Monitoring Program

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Eun-Chan [Korea Hydro and Nuclear Power Co. Ltd., Daejeon (Korea, Republic of)

    2015-10-15

    Loss of voltage (LOV) events continue to occur due to inadequate work management and random human errors. On February 26, 2015, regulators analyzed the root causes of LOV events and presented the results for the nuclear industry. Currently, KHNP uses a risk monitoring program, which is named 'LOV Monitor', for LOV prevention during pilot plant outages. This review introduces the operation experiences of LOV Monitor based on the evaluation results of a real event. The operation experiences of LOV Monitor in the pilot plants confirmed that this program could detect and reduce LOV possibilities from scheduling errors such as the simultaneous maintenance of energized trains and de-energized trains considering the physical conditions of the power circuit breakers. However, a maintenance culture that heeds the risk monitoring result must be strengthened in order to obtain substantial effects through applying LOV Monitor to the outage.

  16. Improvement of operational efficiency based on fast startup plant concepts

    Energy Technology Data Exchange (ETDEWEB)

    Kurz, Harald; Meinecke, Gero; Ohresser, Sylvia; Pickard, Andreas

    2010-09-15

    One of the major global challenges of the present time is the reduction of CO2 emissions. Provisions for integration of a CO2 capture plant are already required today in new power plant construction projects in order to enable current plants to also benefit from the possibilities of carbon capture systems to be developed in the future. These provisions for integration should account for the fact that the scrubbing processes are still in the optimization phase. Requisite process parameters may still change in the future. In the development of a plant interface, the paper describes a concept developed by Siemens which ensures maximum flexibility with simultaneous optimization of the plant for the capture process. Emphasis was placed on the following points in the development of this interface and the associated connection concepts: Maximum plant efficiency before and after modification; Maximum flexibility with regard to future process parameters; Optimization of customer investment cash flow; and, Applicability also to existing plants. According to the paper, Siemens can offer a concept which enables future conversion in accordance with the specified criteria. This concept requires no compromises with regard to plant efficiency in process optimization for either current power plant operation without carbon capture or for future operation with carbon capture. The concept also enables retrofitting of existing plants which are not yet capture-ready. However, retrofitting of power plants which are not prepared for operation with carbon capture is considerably more elaborate in most cases, as corridors must frequently still be cleared for the connecting piping.

  17. Reliability of operating WWER monitoring systems

    International Nuclear Information System (INIS)

    Yastrebenetsky, M.A.; Goldrin, V.M.; Garagulya, A.V.

    1996-01-01

    The elaboration of WWER monitoring systems reliability measures is described in this paper. The evaluation is based on the statistical data about failures what have collected at the Ukrainian operating nuclear power plants (NPP). The main attention is devoted to radiation safety monitoring system and unit information computer system, what collects information from different sensors and system of the unit. Reliability measures were used for decision the problems, connected with life extension of the instruments, and for other purposes. (author). 6 refs, 6 figs

  18. Reliability of operating WWER monitoring systems

    Energy Technology Data Exchange (ETDEWEB)

    Yastrebenetsky, M A; Goldrin, V M; Garagulya, A V [Ukrainian State Scientific Technical Center of Nuclear and Radiation Safety, Kharkov (Ukraine). Instrumentation and Control Systems Dept.

    1997-12-31

    The elaboration of WWER monitoring systems reliability measures is described in this paper. The evaluation is based on the statistical data about failures what have collected at the Ukrainian operating nuclear power plants (NPP). The main attention is devoted to radiation safety monitoring system and unit information computer system, what collects information from different sensors and system of the unit. Reliability measures were used for decision the problems, connected with life extension of the instruments, and for other purposes. (author). 6 refs, 6 figs.

  19. Crack Monitoring of Operational Wind Turbine Foundations.

    Science.gov (United States)

    Perry, Marcus; McAlorum, Jack; Fusiek, Grzegorz; Niewczas, Pawel; McKeeman, Iain; Rubert, Tim

    2017-08-21

    The degradation of onshore, reinforced-concrete wind turbine foundations is usually assessed via above-ground inspections, or through lengthy excavation campaigns that suspend wind power generation. Foundation cracks can and do occur below ground level, and while sustained measurements of crack behaviour could be used to quantify the risk of water ingress and reinforcement corrosion, these cracks have not yet been monitored during turbine operation. Here, we outline the design, fabrication and field installation of subterranean fibre-optic sensors for monitoring the opening and lateral displacements of foundation cracks during wind turbine operation. We detail methods for in situ sensor characterisation, verify sensor responses against theoretical tower strains derived from wind speed data, and then show that measured crack displacements correlate with monitored tower strains. Our results show that foundation crack opening displacements respond linearly to tower strain and do not change by more than ±5 μ m. Lateral crack displacements were found to be negligible. We anticipate that the work outlined here will provide a starting point for real-time, long-term and dynamic analyses of crack displacements in future. Our findings could furthermore inform the development of cost-effective monitoring systems for ageing wind turbine foundations.

  20. NASA's ATM Technology Demonstration-1: Integrated Concept of Arrival Operations

    Science.gov (United States)

    Baxley, Brian T.; Swenson, Harry N.; Prevot, Thomas; Callantine, Todd J.

    2012-01-01

    This paper describes operations and procedures envisioned for NASA s Air Traffic Management (ATM) Technology Demonstration #1 (ATD-1). The ATD-1 Concept of Operations (ConOps) demonstration will integrate three NASA technologies to achieve high throughput, fuel-efficient arrival operations into busy terminal airspace. They are Traffic Management Advisor with Terminal Metering (TMA-TM) for precise time-based schedules to the runway and points within the terminal area, Controller-Managed Spacing (CMS) decision support tools for terminal controllers to better manage aircraft delay using speed control, and Flight deck Interval Management (FIM) avionics and flight crew procedures to conduct airborne spacing operations. The ATD-1 concept provides de-conflicted and efficient operations of multiple arrival streams of aircraft, passing through multiple merge points, from top-of-descent (TOD) to touchdown. It also enables aircraft to conduct Optimized Profile Descents (OPDs) from en route altitude to the runway, using primarily speed control to maintain separation and schedule. The ATD-1 project is currently addressing the challenges of integrating the three technologies, and implantation into an operational environment. Goals of the ATD-1 demonstration include increasing the throughput of high-density airports, reducing controller workload, increasing efficiency of arrival operations and the frequency of trajectory-based operations, and promoting aircraft ADS-B equipage.

  1. On the definition of a theoretical concept of an operating system

    NARCIS (Netherlands)

    Bergstra, J.A.; Middelburg, C.A.

    2010-01-01

    We dwell on how a definition of a theoretical concept of an operating system, suitable to be incorporated in a mathematical theory of operating systems, could look like. This is considered a valuable preparation for the development of a mathematical theory of operating systems.

  2. Improved core monitoring for improved plant operations

    International Nuclear Information System (INIS)

    Mueller, N.P.

    1987-01-01

    Westinghouse has recently installed a core on-line surveillance, monitoring and operations systems (COSMOS), which uses only currently available core and plant data to accurately reconstruct the core average axial and radial power distributions. This information is provided to the operator in an immediately usable, human-engineered format and is accumulated for use in application programs that provide improved core performance predictive tools and a data base for improved fuel management. Dynamic on-line real-time axial and radial core monitoring supports a variety of plant operations to provide a favorable cost/benefit ratio for such a system. Benefits include: (1) relaxation or elimination of certain technical specifications to reduce surveillance and reporting requirements and allow higher availability factors, (2) improved information displays, predictive tools, and control strategies to support more efficient core control and reduce effluent production, and (3) expanded burnup data base for improved fuel management. Such systems can be backfit into operating plants without changing the existing instrumentation and control system and can frequently be implemented on existing plant computer capacity

  3. Standard hydrogen monitoring system-B operation and maintenance manual

    International Nuclear Information System (INIS)

    Bender, R.M.

    1995-01-01

    The purpose of this document is to provide information for the operation and maintenance of the Standards Hydrogen Monitoring System-B (SHMS-B) used in the 200E and 200W area tank farms on the Hanford site. This provides information specific to the mechanical operation of the system and is not intended to take the place of a Plant Operating Procedure. The primary function of the SHMS-B is to monitor specifically for hydrogen in the waste tank vapor space which may also contain unknown quantities of other gaseous constituents

  4. Towards a Global Monitoring System for CMS Computing Operations

    Energy Technology Data Exchange (ETDEWEB)

    Bauerdick, L. A.T. [Fermilab; Sciaba, Andrea [CERN

    2012-01-01

    The operation of the CMS computing system requires a complex monitoring system to cover all its aspects: central services, databases, the distributed computing infrastructure, production and analysis workflows, the global overview of the CMS computing activities and the related historical information. Several tools are available to provide this information, developed both inside and outside of the collaboration and often used in common with other experiments. Despite the fact that the current monitoring allowed CMS to successfully perform its computing operations, an evolution of the system is clearly required, to adapt to the recent changes in the data and workload management tools and models and to address some shortcomings that make its usage less than optimal. Therefore, a recent and ongoing coordinated effort was started in CMS, aiming at improving the entire monitoring system by identifying its weaknesses and the new requirements from the stakeholders, rationalise and streamline existing components and drive future software development. This contribution gives a complete overview of the CMS monitoring system and a description of all the recent activities that have been started with the goal of providing a more integrated, modern and functional global monitoring system for computing operations.

  5. Automatic Adjustments of a Trans-oesophageal Ultrasound Robot for Monitoring Intra-operative Catheters

    Science.gov (United States)

    Wang, Shuangyi; Housden, James; Singh, Davinder; Rhode, Kawal

    2017-12-01

    3D trans-oesophageal echocardiography (TOE) has become a powerful tool for monitoring intra-operative catheters used during cardiac procedures in recent years. However, the control of the TOE probe remains as a manual task and therefore the operator has to hold the probe for a long period of time and sometimes in a radiation environment. To solve this problem, an add-on robotic system has been developed for holding and manipulating a commercial TOE probe. This paper focuses on the application of making automatic adjustments to the probe pose in order to accurately monitor the moving catheters. The positioning strategy is divided into an initialization step based on a pre-planning method and a localized adjustments step based on the robotic differential kinematics and related image servoing techniques. Both steps are described in the paper along with simulation experiments performed to validate the concept. The results indicate an error less than 0.5 mm for the initialization step and an error less than 2 mm for the localized adjustments step. Compared to the much bigger live 3D image volume, it is concluded that the methods are promising. Future work will focus on evaluating the method in the real TOE scanning scenario.

  6. Development of the job concept of a nuclear power plant operator

    International Nuclear Information System (INIS)

    Alpeev, A.S.; Bukrinskii, A.M.

    1994-01-01

    An important conclusion drawn in the aftermath of the 1979 accident at Three Mile Island 2 in the USA, in particular, in discussions, held in Stockholm in 1980 at the International Conference on Safety Problems, of the causes of this accident, was that the plant-operator concept employed at the time in western countries had to be changed. The concept presupposed that the operator's actions must be strictly limited by instructions which supposedly encompass all possible situations associated with the accidents. The principal problem facing the operator in this concept is to identify the situation in which the appropriate instruction can be selected for immediate execution. An error in identifying the situation could influence decisively the evolution of further events in the power block of the nuclear plant, and this is precisely what happened at Three Mile Island 2. For this reason, operator training was based mainly on identifying the initial events, which corresponded to a definite sequence of the further developments owing to the technical scheme and laws of thermophysical processes. Such operator training is based on an event tree which gives a graphical representation of the probable consequences of the development of events in an accident with a given initial event. It is believed that approximately 20 initial events (tree roots) form the basic collection of events, each of which has three to seven branches, i.e., an accident can evolve in several possible directions. Every branch point on each tree is identified by a definite collection of technological parameters, according to which the operator must be able to identify the situation. Under the present concept, when the situation is identified correctly, the search for the required control instruction and its execution is a secondary process

  7. Operational margin monitoring system for boiling water reactor power plants

    International Nuclear Information System (INIS)

    Fukutomi, S.; Takigawa, Y.

    1992-01-01

    This paper reports on an on-line operational margin monitoring system which has been developed for boiling water reactor power plants to improve safety, reliability, and quality of reactor operation. The system consists of a steady-state core status prediction module, a transient analysis module, a stability analysis module, and an evaluation and guidance module. This system quantitatively evaluates the thermal margin during abnormal transients as well as the stability margin, which cannot be evaluated by direct monitoring of the plant parameters, either for the current operational state or for a predicted operating state that may be brought about by the intended operation. This system also gives operator guidance as to appropriate or alternate operations when the operating state has or will become marginless

  8. Operational health physics training

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-06-01

    The initial four sections treat basic information concerning atomic structure and other useful physical quantities, natural radioactivity, the properties of {alpha}, {beta}, {gamma}, x rays and neutrons, and the concepts and units of radiation dosimetry (including SI units). Section 5 deals with biological effects and the risks associated with radiation exposure. Background radiation and man-made sources are discussed next. The basic recommendations of the ICRP concerning dose limitations: justification, optimization (ALARA concepts and applications) and dose limits are covered in Section seven. Section eight is an expanded version of shielding, and the internal dosimetry discussion has been extensively revised to reflect the concepts contained in the MIRD methodology and ICRP 30. The remaining sections discuss the operational health physics approach to monitoring radiation. Individual sections include radiation detection principles, instrument operation and counting statistics, health physics instruments and personnel monitoring devices. The last five sections deal with the nature of, operation principles of, health physics aspects of, and monitoring approaches to air sampling, reactors, nuclear safety, gloveboxes and hot cells, accelerators and x ray sources. Decontamination, waste disposal and transportation of radionuclides are added topics. Several appendices containing constants, symbols, selected mathematical topics, and the Chart of the Nuclides, and an index have been included.

  9. Operational health physics training

    International Nuclear Information System (INIS)

    1988-09-01

    The initial four sections treat basic information concerning atomic structure and other useful physical quantities, natural radioactivity, the properties of α, β, γ, x rays and neutrons, and the concepts and units of radiation dosimetry (including SI units). Section 5 deals with biological effects and the risks associated with radiation exposure. Background radiation and man-made sources are discussed next. The basic recommendations of the ICRP concerning dose limitations: justification, optimization (ALARA concepts and applications) and dose limits are covered in Section seven. Section eight is an expanded version of shielding, and the internal dosimetry discussion has been extensively revised to reflect the concepts contained in the MIRD methodology and ICRP 30. The remaining sections discuss the operational health physics approach to monitoring radiation. Individual sections include radiation detection principles, instrument operation and counting statistics, health physics instruments and personnel monitoring devices. The last five sections deal with the nature of, operation principles of, health physics aspects of, and monitoring approaches to air sampling, reactors, nuclear safety, gloveboxes and hot cells, accelerators and x ray sources. Decontamination, waste disposal and transportation of radionuclides are added topics. Several appendices containing constants, symbols, selected mathematical topics, and the Chart of the Nuclides, and an index have been included

  10. Domestic water and sanitation as water security: monitoring, concepts and strategy

    Science.gov (United States)

    Bradley, David J.; Bartram, Jamie K.

    2013-01-01

    Domestic water and sanitation provide examples of a situation where long-term, target-driven efforts have been launched with the objective of reducing the proportion of people who are water-insecure, most recently through the millennium development goals (MDGs) framework. Impacts of these efforts have been monitored by an increasingly evidence-based system, and plans for the next period of international policy, which are likely to aim at universal coverage with basic water and sanitation, are being currently developed. As distinct from many other domains to which the concept of water security is applied, domestic or personal water security requires a perspective that incorporates the reciprocal notions of provision and risk, as the current status of domestic water and sanitation security is dominated by deficiency This paper reviews the interaction of science and technology with policies, practice and monitoring, and explores how far domestic water can helpfully fit into the proposed concept of water security, how that is best defined, and how far the human right to water affects the situation. It is considered that they fit well together in terms both of practical planning of targets and indicators and as a conceptual framework to help development. The focus needs to be broad, to extend beyond households, to emphasize maintenance as well as construction and to increase equity of access. International and subnational monitoring need to interact, and monitoring results need to be meaningful to service providers as well as users. PMID:24080628

  11. Operational concepts for the Environmental Restoration and Waste Management Configuration Study

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1990-12-01

    DOE has initiated a planning process in anticipation of upgrading all DOE waste management operations and facilities. The EM Configuration Study examines four areas: (1) planning considerations, (2) system configuration, (3) operational concepts, and (4) resource assessments. Each area is addressed by a different team. Objective of the Operational Concepts Team 3 study is to investigate, identify, define, and evaluate alternative ways to manage DOE waste management facilities, while taking into consideration the information gathered by the other EM Configuration teams. This report provides information and criteria for evaluating the relative effectiveness and efficiency of various organizational alternatives that can be used to operate and manage DOE waste facilities. Intent of this report is not to select one best management alternative but rather to provide recommendations, conclusions, and background information from which decisions will be made at a future date.

  12. Fatigue Monitoring Tool for Airline Operators (FMT

    Directory of Open Access Journals (Sweden)

    Gislason Sigurdur Hrafn

    2017-12-01

    Full Text Available A Fatigue Monitoring Tool (FMT model was constructed for an operational airline in order to manage the fatigue levels of their crews in accordance with Fatigue Risk Management System (FRMS practices. This article describes the implementation of the Fatigue Monitoring Tool model and the airline’s aims to put the recent scientific findings on aviation fatigue into practical use. The model consists of proxy points allotted to various duties and rest periods.

  13. Concept of Operations for Interval Management Arrivals and Approach

    Science.gov (United States)

    Hicok, Daniel S.; Barmore, Bryan E.

    2016-01-01

    This paper presents the concept of operations for interval management operations to be deployed in the US National Airspace System (NAS) by the Federal Aviation Administration (FAA) after 2020. The use of interval management operations is described that begin in en route airspace and continue to a termination point inside the arrival terminal area, in a terminal environment that includes other arrival management tools such as arrival metering, Ground-based Interval Management - Spacing (GIM-S), and Terminal Sequencing and Spacing (TSAS). The roles of Air Traffic Controllers and Flight Crews and the ground automation tools that are used by Air Traffic Controllers to enable the primary operation and variations are described.

  14. Definition and Evaluation of Bus and Truck Automation Operations Concepts: Final Report

    OpenAIRE

    Taso, H. S. Jacob; Botha, Jan L.

    2003-01-01

    Traffic congestion will continue to worsen and likely worsen at a faster rate than ever. People throughput and freight throughput have become critical issues for California and the rest of the nation. PATH has funded a research project entitled Definition And Evaluation of Bus And Truck Automation Operations Concepts, proposed by the authors. This report summarizes the major findings of the research project. During the one-year project, we reviewed literature and developed operating concepts ...

  15. Principal regulations of the Decommissioning Conception of the operating NPPs in Ukraine

    International Nuclear Information System (INIS)

    Litvins'kij, L.L.; Lobach, Yu.M.; Rusyinko, P.M.

    2004-01-01

    The paper contains the review of principal regulations of the Decommissioning Conception of the operating NPPs in Ukraine. There are presented the results of analysis based on the consideration of three possible scenarios of the nuclear power complex development corresponding to the different terms of the unit's lifetime extension. Concept decommissioning decisions are established; the results of strategic planning and long-term forecast of decommissioning activity on the operating NPPs in Ukraine are presented too

  16. Strategies of performance self-monitoring in automotive production.

    Science.gov (United States)

    Faye, Hélène; Falzon, Pierre

    2009-09-01

    Production in the automotive industry, based on assembly line work, is now characterized by lean manufacturing and customization. This results in greater flexibility and increased quality demands, including worker performance self-monitoring. The objectives of this study are to refine the concept of performance self-monitoring and to characterize the strategies developed by operators to achieve it. Data were collected based on the method of individual auto-confrontation, consisting of two steps: eleven assembly-line operators of a French automotive company were individually observed and video-taped while they were working; an interview then allowed each operator to discuss his/her activity based on the video-tape. This study expands the concept of performance self-monitoring by highlighting three types of strategies directly oriented toward quality: prevention, feedback control and control action strategies.

  17. The Principle of Operative Concept Formation in Geometry Teaching.

    Science.gov (United States)

    Bender, Peter; Schreiber, Alfred

    1980-01-01

    A didactic principle of operative concept formation is described and explained. It is argued that this principle meets current demands for practical geometric activities with concrete forms and for the exploration of the primordial relation between geometry and reality. (MK)

  18. Monitoring method for steam generator operation

    International Nuclear Information System (INIS)

    Tamaoki, Tetsuo

    1991-01-01

    In an LMFBR plant having an once-through steam generator, reduction of life of a heat transfer pipe caused by heat cycle fatigue is monitored by early finding for the occurrence of abnormality in the inside of the steam generator and by continuous monitoring for the position of departure from nucleate boiling (DNB), which are difficult with existent static characteristic analysis codes. That is, RMS values of fluctuations in temperature signals sent from thermocouples for measuring the fluid temperature in the vicinity of heat transfer pipe disposed along a primary channel of the once-through type steam generator. The abnormality in heat transfer performance is monitored by the distribution change of the RMS values. Subsequently, DNB point on the side of water and steam is determined by the distribution of the RMS value. Then, accumulated values of the product between the time in which the starting point stays in the DNB region and a life consumption amount per unit time given in accordance with the operation condition are monitored. Accordingly, thermal fatigue failure of the heat transfer pipe due to temperature fluctuation in the DNB region is monitored. (I.S.)

  19. Performance Measurement Using Balanced Scorecard Concept On Co-Operatives Implication In Indonesia

    Directory of Open Access Journals (Sweden)

    Ernita

    2015-08-01

    Full Text Available Abstract This study aims to apply the concept of balanced scorecards in measurement of co-operatives performance based on vision and mission. So far the assessment of co-operative performance in Indonesia is not take into account the social hold co-operative while co-operatives carrying a dual mission. Research conducted in in North Sumatera Province in Indonesia. The sample consisting of one hundred co-operatives that are still active run annual members meeting. Co-operative performance was assessed based on its fourth perspective i.e. membership financial internal process and learning amp growth. The indicator key of cooperative performance was determined by taking into account the performance assessment on co-operatives as articulated of State Minister for Co-operatives and SMEs No.129KEPMKUMKMXI2002 and the regulations of the State Minister for Co-operatives and SME No.06PerM.KUKMV2006. Therefore this research were contributed a method in assessing co-operative performance using Balanced Scorecard concept with the four perspective namely membership perspective financial perspective internal process perspective and learning amp growth perspective.

  20. MONITORING CONCEPTS FOR COASTAL AREAS USING LIDAR DATA

    Directory of Open Access Journals (Sweden)

    A. Schmidt

    2013-05-01

    Full Text Available Coastal areas are characterized by high spatial and temporal variability. In order to detect undesired changes at early stages, enabling rapid countermeasures to mitigate or minimize potential harm or hazard, a recurrent monitoring becomes necessary. In this paper, we focus on two monitoring task: the analysis of morphological changes and the classification and mapping of habitats. Our concepts are solely based on airborne lidar data which provide substantial information in coastal areas. For the first task, we generate a digital terrain model (DTM from the lidar point cloud and analyse the dynamic of an island by comparing the DTMs of different epochs with a time difference of six years. For the deeper understanding of the habitat composition in coastal areas, we classify the lidar point cloud by a supervised approach based on Conditional Random Fields. From the classified point cloud, water-land-boundaries as well as mussel bed objects are derived afterwards. We evaluate our approaches on two datasets of the German Wadden Sea.

  1. Just-in-time classifiers for recurrent concepts.

    Science.gov (United States)

    Alippi, Cesare; Boracchi, Giacomo; Roveri, Manuel

    2013-04-01

    Just-in-time (JIT) classifiers operate in evolving environments by classifying instances and reacting to concept drift. In stationary conditions, a JIT classifier improves its accuracy over time by exploiting additional supervised information coming from the field. In nonstationary conditions, however, the classifier reacts as soon as concept drift is detected; the current classification setup is discarded and a suitable one activated to keep the accuracy high. We present a novel generation of JIT classifiers able to deal with recurrent concept drift by means of a practical formalization of the concept representation and the definition of a set of operators working on such representations. The concept-drift detection activity, which is crucial in promptly reacting to changes exactly when needed, is advanced by considering change-detection tests monitoring both inputs and classes distributions.

  2. Methodology for Designing Operational Banking Risks Monitoring System

    Science.gov (United States)

    Kostjunina, T. N.

    2018-05-01

    The research looks at principles of designing an information system for monitoring operational banking risks. A proposed design methodology enables one to automate processes of collecting data on information security incidents in the banking network, serving as the basis for an integrated approach to the creation of an operational risk management system. The system can operate remotely ensuring tracking and forecasting of various operational events in the bank network. A structure of a content management system is described.

  3. NASA Research on an Integrated Concept for Airport Surface Operations Management

    Science.gov (United States)

    Gupta, Gautam

    2012-01-01

    Surface operations at airports in the US are based on tactical operations, where departure aircraft primarily queue up and wait at the departure runways. There have been attempts to address the resulting inefficiencies with both strategic and tactical tools for metering departure aircraft. This presentation gives an overview of Spot And Runway Departure Advisor with Collaborative Decision Making (SARDA-CDM): an integrated strategic and tactical system for improving surface operations by metering departure aircraft. SARDA-CDM is the augmentation of ground and local controller advisories through sharing of flight movement and related operations information between airport operators, flight operators and air traffic control at the airport. The goal is to enhance the efficiency of airport surface operations by exchanging information between air traffic control and airline operators, while minimizing adverse effects on stakeholders and passengers. The presentation motivates the need for departure metering, and provides a brief background on the previous work on SARDA. Then, the concept of operations for SARDA-CDM is described. Then the preliminary results from testing the concept in a real-time automated simulation environment are described. Results indicate benefits such as reduction in taxiing delay and fuel consumption. Further, the preliminary implementation of SARDA-CDM seems robust for two minutes delay in gate push-back times.

  4. Monitoring concept for structural integration of PZT-fiber arrays in metal sheets: a numerical and experimental study

    Science.gov (United States)

    Drossel, Welf-Guntram; Schubert, Andreas; Putz, Matthias; Koriath, Hans-Joachim; Wittstock, Volker; Hensel, Sebastian; Pierer, Alexander; Müller, Benedikt; Schmidt, Marek

    2018-01-01

    The technique joining by forming allows the structural integration of piezoceramic fibers into locally microstructured metal sheets without any elastic interlayers. A high-volume production of the joining partners causes in statistical deviations from the nominal dimensions. A numerical simulation on geometric process sensitivity shows that the deviations have a high significant influence on the resulting fiber stresses after the joining by forming operation and demonstrate the necessity of a monitoring concept. On this basis, the electromechanical behavior of piezoceramic array transducers is investigated experimentally before, during and after the joining process. The piezoceramic array transducer consists of an arrangement of five electrical interconnected piezoceramic fibers. The findings show that the impedance spectrum depends on the fiber stresses and can be used for in-process monitoring during the joining process. Based on the impedance values the preload state of the interconnected piezoceramic fibers can be specifically controlled and a fiber overload.

  5. Concept of Complex Environmental Monitoring Network - Vardzia Rock Cut City Case Study

    Science.gov (United States)

    Elashvili, Mikheil; Vacheishvili, Nikoloz; Margottini, Claudio; Basilaia, Giorgi; Chkhaidze, Davit; Kvavadze, Davit; Spizzichino, Daniele; Boscagli, Franceso; Kirkitadze, Giorgi; Adikashvili, Luka; Navrozashvili, Levan

    2016-04-01

    Vardzia represents an unique cultural heritage monument - rock cut city, which unites architectural monument and Natural-Geological complex. Such monuments are particularly vulnerable and their restoration and conservation requires complex approach. It is curved in various layers of volcanic tuffs and covers several hectares of area, with chronologically different segments of construction. This monument, as many similar monuments worldwide, is subjected to slow but permanent process of destruction, expressed in following factors: surface weathering of rock, active tectonics (aseismic displacement along the active faults and earthquakes), interaction between lithologically different rock layers, existence of major cracks and associated complex block structure, surface rainwater runoff and infiltrated ground water, temperature variations, etc. During its lifetime, Vardzia was heavily damaged by Historical Earthquake of 1283 and only partly restored afterwards. The technological progress together with the increased knowledge about ongoing environmental processes, established the common understanding that the complex monitoring of the environment represents the essential component for resolving such a principal issues, as: Proper management and prevention of natural disasters; Modeling of environmental processes, their short and long term prognosis; Monitoring of macro and micro climate; Safe functioning and preservation of important constructions. Research Center of Cultural Heritage and Environment of Ilia State University in cooperation with Experts from ISPRA, with the funding from the State agency of Cultural Heritage, has developed a concept of Vardzia complex monitoring network. Concept of the network includes: monitoring local meteorological conditions (meteorological station), monitoring microclimate in caves (temperature and humidity in the air and rock), monitoring microtremors and ambient seismic noise in Vardzia (local strong motion network), monitoring

  6. Designing for Wide-Area Situation Awareness in Future Power Grid Operations

    Science.gov (United States)

    Tran, Fiona F.

    Power grid operation uncertainty and complexity continue to increase with the rise of electricity market deregulation, renewable generation, and interconnectedness between multiple jurisdictions. Human operators need appropriate wide-area visualizations to help them monitor system status to ensure reliable operation of the interconnected power grid. We observed transmission operations at a control centre, conducted critical incident interviews, and led focus group sessions with operators. The results informed a Work Domain Analysis of power grid operations, which in turn informed an Ecological Interface Design concept for wide-area monitoring. I validated design concepts through tabletop discussions and a usability evaluation with operators, earning a mean System Usability Scale score of 77 out of 90. The design concepts aim to support an operator's complete and accurate understanding of the power grid state, which operators increasingly require due to the critical nature of power grid infrastructure and growing sources of system uncertainty.

  7. Plant operation monitoring method and device therefor

    International Nuclear Information System (INIS)

    Ando, Tsugio; Matsuki, Tsutomu.

    1997-01-01

    The present invention provides a method of and a device for monitoring the operation of a nuclear power plant during operation, which improves the safety and reliability of operation without increasing an operator's burden. Namely, a chief in charge orally instruct an operation to an operator upon the operation of a plant constituent equipment. The operator points the equipment and calls the name. Actual operation instruction for the equipment is inputted after confirmation by oral response. The voices of theses series of operation instruction/point-calling/response confirmation are taken into a voice recognition processing device. The processing device discriminates each of the person who calls, and discriminates the content of the calls and objective equipments to be operated. Then, the series of procedures and contents of the operation for the equipments previously disposed in the data base are compared with the order of inputted calls, discriminated contents and the objective equipments to be operated. If they are not agreed with each other, the operation instruction is blocked even if actual operation instructions are inputted. (I.S.)

  8. Proposal for operator's mental model using the concept of multilevel flow modeling

    International Nuclear Information System (INIS)

    Yoshimura, Seiichi; Takano, Kenichi; Sasou, Kunihide

    1995-01-01

    It is necessary to analyze an operator's thinking process and a operator team's intension forming process for preventing human errors in a highly advanced huge system like a nuclear power plant. Central Research Institute of Electric Power Industry is promoting a research project to establish human error prevention countermeasures by modeling the thinking and intension forming process. The important is the future prediction and the cause identification when abnormal situations occur in a nuclear power plant. The concept of Multilevel Flow Modeling (MFM) seems to be effective as an operator's mental model which performs the future prediction and the cause identification. MFM is a concept which qualitatively describes the plant functions by energy and mass flows and also describes the plant status by breaking down the targets in a hierarchical manner which a plant should achieve. In this paper, an operator's mental model using the concept of MFM was proposed and a nuclear power plant diagnosis support system using MFM was developed. The system evaluation test by personnel who have operational experience in nuclear power plants revealed that MFM was superior in the future prediction and the cause identification to a traditional nuclear power plant status display system which used mimics and trends. MFM proved to be useful as an operator's mental model by the test. (author)

  9. Operation status display and monitoring system for BWR nuclear power plant

    International Nuclear Information System (INIS)

    Wakabayashi, Yasuo; Hayakawa, Hiroyasu; Kawamura, Atsuo; Kaneda, Mitsunori.

    1982-01-01

    Lately, the development of the system has been made for BWR plants, which monitors the operating status not only in normal operation but also in abnormal state and also for plant safety. Recently, the improvement of man-machine interface has been tried through the practical use of technique which displays data collectively on a CRT screen relating them mutually. As one of those results, the practical use of an electronic computer and color CRT display for No. 1 unit in the Fukushima No. 2 Nuclear Power Station (2F-1), Tokyo Electric Power Co., is described. Also, new centralized control panels containing such systems were used for the 1100 MWe BWR nuclear power plants now under construction, No. 3 unit of the Fukushima No. 2 Power Station and No. 1 unit of Kashiwazaki-Kariwa Nuclear Power Station (2F-3 and K-1, respectively). The display and monitoring system in 2F-1 plant is the first one in which a computer and color CRTs were practically employed for a BWR plant in Japan, and already in commercial operation. The advanced operating status monitoring system, to which the result of evaluation of the above system was added, was incorporated in the new centralized control panels presently under production for 2F-3 and K-1 plants. The outline of the system, the functions of an electronic computer, plant operating status monitor, surveillance test guide, the automation of plant operation and auxiliary operation guide are reported for these advanced monitoring system. It was confirmed that these systems are useful means to improve the man-machine communication for plant operation minitoring. (Wakatsuki, Y.)

  10. Hyper-Spectral Networking Concept of Operations and Future Air Traffic Management Simulations

    Science.gov (United States)

    Davis, Paul; Boisvert, Benjamin

    2017-01-01

    The NASA sponsored Hyper-Spectral Communications and Networking for Air Traffic Management (ATM) (HSCNA) project is conducting research to improve the operational efficiency of the future National Airspace System (NAS) through diverse and secure multi-band, multi-mode, and millimeter-wave (mmWave) wireless links. Worldwide growth of air transportation and the coming of unmanned aircraft systems (UAS) will increase air traffic density and complexity. Safe coordination of aircraft will require more capable technologies for communications, navigation, and surveillance (CNS). The HSCNA project will provide a foundation for technology and operational concepts to accommodate a significantly greater number of networked aircraft. This paper describes two of the HSCNA projects technical challenges. The first technical challenge is to develop a multi-band networking concept of operations (ConOps) for use in multiple phases of flight and all communication link types. This ConOps will integrate the advanced technologies explored by the HSCNA project and future operational concepts into a harmonized vision of future NAS communications and networking. The second technical challenge discussed is to conduct simulations of future ATM operations using multi-bandmulti-mode networking and technologies. Large-scale simulations will assess the impact, compared to todays system, of the new and integrated networks and technologies under future air traffic demand.

  11. Monitoring data transfer latency in CMS computing operations

    CERN Document Server

    Bonacorsi, D; Magini, N; Sartirana, A; Taze, M; Wildish, T

    2015-01-01

    During the first LHC run, the CMS experiment collected tens of Petabytes of collision and simulated data, which need to be distributed among dozens of computing centres with low latency in order to make efficient use of the resources. While the desired level of throughput has been successfully achieved, it is still common to observe transfer workflows that cannot reach full completion in a timely manner due to a small fraction of stuck files which require operator intervention.For this reason, in 2012 the CMS transfer management system, PhEDEx, was instrumented with a monitoring system to measure file transfer latencies, and to predict the completion time for the transfer of a data set. The operators can detect abnormal patterns in transfer latencies while the transfer is still in progress, and monitor the long-term performance of the transfer infrastructure to plan the data placement strategy.Based on the data collected for one year with the latency monitoring system, we present a study on the different fact...

  12. Rating of intra-operative neuro-monitoring results in operative correction of the spinal deformities

    Directory of Open Access Journals (Sweden)

    A. A. Skripnikov

    2015-01-01

    Full Text Available Purpose of the work was filing the electrophysiological phenomena observed in the process of intra-operative neuromonitoring followed by development of the results’ scale of intra-operative neuro-physiological testing of the pyramidal tract. Materials and мethods. The selection for evaluation included data of 147 protocols of intra-operative neuromonitoring in 135 patients (53 males, 82 females, aged from 1 y. 5 m. to 52 years (14,1±0,7 years with spinal deformities of different etiology who underwent instrumentation spinal correction followed by fixation of thoracic / thoracolumbar spine segments using various variants of internal systems of trans-pedicular fixation. Intra-operative neuro-monitoring was performed using system «ISIS IOM» (Inomed Medizintechnik GmbH, Germany. The changes of motor evoked potentials were evaluated according to this scale. Results. Five types of pyramidal system reaction to operative invasion were revealed. According to neurophysiological criteria three grades of the risk of neurological disorders development during operative spinal deformity correction and, correspondingly, three levels of anxiety for the surgeon were defined. Conclusion. Intra-operative neurophysiological monitoring is the effective highly technological instrument to prevent neurological disorders in the spinal deformity. Offered rating scale of the risk of neurological complications gives the possibility to highlight three levels of anxiety during operative invasion.

  13. Development of an air-operated actuator performance monitoring system for regulatory usage

    International Nuclear Information System (INIS)

    Sung, K. Y.; Kwon, S. J.

    2004-01-01

    The performance monitoring system of air-operated actuators for regulatory usage has been being developed. Essential elements and operating parameters affecting the actuator performance have been investigated to provide basic information for system development. The monitoring system including an air-operated actuator testing facility and analysis softwares for monitoring and evaluation are also introduced in this paper. As a result of simulated tests, it was known that the system could be a useful tool for the effective monitoring of actuator performance change and fault conditions. This system would be applied to regulatory inspection for utility's data validation and to the training of regulatory staff in future after some modification and expansion

  14. The SPS Beam quality monitor, from design to operation

    CERN Document Server

    Papotti, G; Follin, F; Shaposhnikova, E

    2011-01-01

    The SPS Beam Quality Monitor is a system that monitors longitudinal beam parameters on a cycle-by-cycle basis and prevents extraction to the LHC in case the specifications are not met. This avoids losses, unnecessary stress of machine protection components and luminosity degradation, additionally helping efficiency during the filling process. The system has been operational since the 2009 LHC run, checking the beam pattern, its correct position with respect to the LHC references, individual bunch lengths and stability. In this paper the algorithms used, the hardware implementation and the operational aspects are presented.

  15. Improving Operations Management Concept Recollection via the Zarco Experiential Learning Activity

    Science.gov (United States)

    Polito, Tony; Kros, John; Watson, Kevin

    2004-01-01

    In this study, the authors investigated the effect of Zarco, an operations management "mock factory" experiential learning activity, on student recollection of operations management concepts. Using a number of single-factor and multiple-factor analyses of variance, the authors compared the recollection of students treated with the Zarco activity…

  16. Carrington-L5: The UK/US Operational Space Weather Monitoring Mission

    Science.gov (United States)

    Trichas, Markos; Gibbs, Mark; Harrison, Richard; Green, Lucie; Eastwood, Jonathan; Bentley, Bob; Bisi, Mario; Bogdanova, Yulia; Davies, Jackie; D'Arrigo, Paolo; Eyles, Chris; Fazakerley, Andrew; Hapgood, Mike; Jackson, David; Kataria, Dhiren; Monchieri, Emanuele; Windred, Phil

    2015-06-01

    Airbus Defence and Space (UK) has carried out a study to investigate the possibilities for an operational space weather mission, in collaboration with the Met Office, RAL, MSSL and Imperial College London. The study looked at the user requirements for an operational mission, a model instrument payload, and a mission/spacecraft concept. A particular focus is cost effectiveness and timelineness of the data, suitable for 24/7 operational forecasting needs. We have focussed on a mission at L5 assuming that a mission to L1 will already occur, on the basis that L5 (Earth trailing) offers the greatest benefit for the earliest possible warning on hazardous SWE events and the most accurate SWE predictions. The baseline payload has been selected to cover all UK Met Office/NOAA's users priorities for L5 using instruments with extensive UK/US heritage, consisting of: heliospheric imager, coronograph, magnetograph, magnetometer, solar wind analyser and radiation monitor. The platform and subsystems are based on extensive re-use from past Airbus Defence and Space spacecraft to minimize the development cost and a Falcon-9 launcher has been selected on the same basis. A schedule analysis shows that the earliest launch could be achieved by 2020, assuming Phase A kick-off in 2015-2016. The study team have selected the name "Carrington" for the mission, reflecting the UK's proud history in this domain.

  17. Concept of Operations for Real-time Airborne Management System

    Energy Technology Data Exchange (ETDEWEB)

    Barr, Jonathan L.; Taira, Randal Y.; Orr, Heather M.

    2013-03-04

    The purpose of this document is to describe the operating concepts, capabilities, and benefits of RAMS including descriptions of how the system implementations can improve emergency response, damage assessment, task prioritization, and situation awareness. This CONOPS provides general information on operational processes and procedures required to utilize RAMS, and expected performance benefits of the system. The primary audiences for this document are the end users of RAMS (including flight operators and incident commanders) and the RAMS management team. Other audiences include interested offices within the Department of Homeland Security (DHS), and officials from other state and local jurisdictions who want to implement similar systems.

  18. Cavern disposal concepts for HLW/SF: assuring operational practicality and safety with maximum programme flexibility

    International Nuclear Information System (INIS)

    McKinley, Ian G.; Apted, Mick; Umeki, Hiroyuki; Kawamura, Hideki

    2008-01-01

    Most conventional engineered barrier system (EBS) designs for HLW/SF repositories are based on concepts developed in the 1970s and 1980s that assured feasibility with high margins of safety, in order to convince national decision makers to proceed with geological disposal despite technological uncertainties. In the interval since the advent of such 'feasibility designs', significant progress has been made in reducing technological uncertainties, which has lead to a growing awareness of other, equally important uncertainties in operational implementation and challenges regarding social acceptance in many new, emerging national repository programs. As indicated by the NUMO repository concept catalogue study (NUMO, 2004), there are advantages in reassessing how previous designs can be modified and optimised in the light of improved system understanding, allowing a robust EBS to be flexibly implemented to meet nation-specific and site-specific conditions. Full-scale emplacement demonstrations, particularly those carried out underground, have highlighted many of the practical issues to be addressed; e.g., handling of compacted bentonite in humid conditions, use of concrete for support infrastructure, remote handling of heavy radioactive packages in confined conditions, quality inspection, monitoring / ease of retrieval of emplaced packages and institutional control. The CAvern REtrievable (CARE) concept reduces or avoids such issues by emplacement of HLW or SF within multi-purpose transportation / storage / disposal casks in large ventilated caverns at a depth of several hundred metres. The facility allows the caverns to serve as inspectable stores for an extended period of time (up to a few hundred years) until a decision is made to close them. At this point the caverns are backfilled and sealed as a final repository, effectively with the same safety case components as conventional 'feasibility designs'. In terms of operational practicality an d safety, the CARE

  19. Ionization beam profile monitor for operation under hard environmental conditions

    International Nuclear Information System (INIS)

    Teterev, Yu.G.; Kaminski, G.; Phi Thanh Huong; Kaminski, G.; Kozik, E.

    2010-01-01

    The design and the performance of the Ionization Beam Profile Monitor (IBPM) operating on the residual gas ionization principle are described. The main advantage of the constructed device is the non-contact measuring method. Operating under hard environmental conditions it delivers the information about the primary beam position, profile and intensity in 'on-line' regime. It was found out that the device is capable to operate in vacuum in the range of 10 -6 /10 -3 mbar without the loss of the resolution power at the beam current as low as a few nA. The IBPM is prospective for beam profile monitoring due to long time. Emergency situations do not lead to decrease of its operability.

  20. Paper on operation and maintenance experiences on radiation monitoring instrumentation at NAPS

    International Nuclear Information System (INIS)

    Gupta, J.P.; Vinod Kumar; Sen, S.K.; Malhotra, S.

    2005-01-01

    Narora Atomic Power Station (NAPS) is the first standardized Pressurised Heavy Water Reactor in India commissioned in the year 1989. Many new Radiation Monitoring Systems like Portal Monitors and Ventilation Exhaust Activity Monitors were first time introduced at NAPS. All the Personnel Contamination Monitors and Area Radiation Monitors used at NAPS were designed and developed by Electronics Division, BARC. Only the Portal Monitor was supplied by M/S Herfurth, Germany. The paper highlights the operation and maintenance experiences on Radiation Monitoring Instrumentation at NAPS in the last 15 years of operation. The paper also highlights the different problems faced in Radiation Instruments and our suggestions for improvement in their design for their better availability and long term reliability. (author)

  1. Operation of radiation monitoring system in radwaste form test facility

    International Nuclear Information System (INIS)

    Ryu, Young Gerl; Kim, Ki Hong; Lee, Jae Won; Kwac, Koung Kil

    1998-08-01

    RWFTF (RadWaste Form Test Facility) must have a secure radiation monitoring system (RMS) because of having a hot-cell capable of handling high radioactive materials. And then in controlled radiation zone, which is hot-cell and its maintenance and operation / control room, area dose rate, radioactivities in air-bone particulates and stack, and surface contamination are monitored continuously. For the effective management such as higher utilization, maintenance and repair, the status of this radiation monitoring system, the operation and characteristics of all kinds of detectors and other parts of composing this system, and signal treatment and its evaluation were described in this technical report. And to obtain the accuracy detection results and its higher confidence level, the procedure such as maintenance, functional check and system calibration were established and appended to help the operation of RMS. (author). 6 tabs., 30 figs

  2. Concept of operations : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2010-06-01

    This concept of operations (Con Ops) for the US-75 Integrated Corridor Management (ICM) Program has been developed as part of the US : Department of Transportation Integrated Corridor Management Initiative, which is an innovative research initiative ...

  3. Preliminary Validation of the Small Aircraft Transportation System Higher Volume Operations (SATS HVO) Concept

    Science.gov (United States)

    Williams, Daniel; Consiglio, Maria; Murdoch, Jennifer; Adams, Catherine

    2004-01-01

    This document provides a preliminary validation of the Small Aircraft Transportation System (SATS) Higher Volume Operations (HVO) concept for normal conditions. Initial results reveal that the concept provides reduced air traffic delays when compared to current operations without increasing pilot workload. Characteristic to the SATS HVO concept is the establishment of a newly defined area of flight operations called a Self-Controlled Area (SCA) which would be activated by air traffic control (ATC) around designated non-towered, non-radar airports. During periods of poor visibility, SATS pilots would take responsibility for separation assurance between their aircraft and other similarly equipped aircraft in the SCA. Using onboard equipment and simple instrument flight procedures, they would then be better able to approach and land at the airport or depart from it. This concept would also require a new, ground-based automation system, typically located at the airport that would provide appropriate sequencing information to the arriving aircraft. Further validation of the SATS HVO concept is required and is the subject of ongoing research and subsequent publications.

  4. A modern concept for status oriented vibration monitoring of big turbogenerators

    International Nuclear Information System (INIS)

    Herz, F.; Theodor, P.

    1997-01-01

    The investigation of mechanical vibrations is an excellent method of showing the current condition of a machine. This paper deals with the vibrations monitoring of large turbo-generators. First the general aspects of monitoring, as well as diagnostic strategies and impact on the operation of the installation is discussed. An example of a condition-oriented vibration monitoring is the description of the 'Vibroview' system recently developed and installed in the Leibstadt nuclear power plant. (author) 16 figs., tabs., refs

  5. Operational experience with two tritium-effluent-monitoring systems

    International Nuclear Information System (INIS)

    Haynie, J.S.; Gutierrez, J.A.

    1982-01-01

    Two new tritium stack monitoring systems were designed and built. The operational experience of a wide-range detector with a useful range of a few μCi/m 3 to 10 8 μCi/m 3 , and a second monitoring system using an improved Kanne chamber and a new electrometer, called a Model 39 Electrometer-Chargemeter are discussed. Both tritium chambers have been designed to have a reduced sensitivity to tritium contamination, a fast response, and an integrating chargemeter with digital readout for easy conversion to microcuries. The calibration of these monitors and advantages of using these chambers over conventional systems are discussed

  6. Test, Control and Monitor System (TCMS) operations plan

    Science.gov (United States)

    Macfarlane, C. K.; Conroy, M. P.

    1993-01-01

    The purpose is to provide a clear understanding of the Test, Control and Monitor System (TCMS) operating environment and to describe the method of operations for TCMS. TCMS is a complex and sophisticated checkout system focused on support of the Space Station Freedom Program (SSFP) and related activities. An understanding of the TCMS operating environment is provided and operational responsibilities are defined. NASA and the Payload Ground Operations Contractor (PGOC) will use it as a guide to manage the operation of the TCMS computer systems and associated networks and workstations. All TCMS operational functions are examined. Other plans and detailed operating procedures relating to an individual operational function are referenced within this plan. This plan augments existing Technical Support Management Directives (TSMD's), Standard Practices, and other management documentation which will be followed where applicable.

  7. Influence of Insulation Monitoring Devices on the Operation of DC Control Circuits

    Energy Technology Data Exchange (ETDEWEB)

    Olszowiec, Piotr, E-mail: olpio@o2.pl [Erea Polaniec (Poland)

    2017-03-15

    The insulation level of DC control circuits is an important safety-critical factor and, thus, should be subject to continuous and periodic monitoring. The methods used for monitoring the insulation in live circuits may, however, disturb the reliable operation of control relays. The risks of misoperation and failure to reset of relays posed by the operation of various insulation monitoring and fault location systems are evaluated.

  8. Space Environments and Effects Concept: Transitioning Research to Operations and Applications

    Science.gov (United States)

    Edwards, David L.; Spann, James; Burns, Howard D.; Schumacher, Dan

    2012-01-01

    The National Aeronautics and Space Administration (NASA) is embarking on a course to expand human presence beyond Low Earth Orbit (LEO) while expanding its mission to explore the solar system. Destinations such as Near Earth Asteroids (NEA), Mars and its moons, and the outer planets are but a few of the mission targets. NASA has established numerous offices specializing in specific space environments disciplines that will serve to enable these missions. To complement these existing discipline offices, a concept focusing on the development of space environment and effects application is presented. This includes space climate, space weather, and natural and induced space environments. This space environment and effects application is composed of 4 topic areas; characterization and modeling, engineering effects, prediction and operation, and mitigation and avoidance. These topic areas are briefly described below. Characterization and modeling of space environments will primarily focus on utilization during Program mission concept, planning, and design phases. Engineering effects includes materials testing and flight experiments producing data to be used in mission planning and design phases. Prediction and operation pulls data from existing sources into decision-making tools and empirical data sets to be used during the operational phase of a mission. Mitigation and avoidance will develop techniques and strategies used in the design and operations phases of the mission. The goal of this space environment and effects application is to develop decision-making tools and engineering products to support the mission phases of mission concept through operations by focusing on transitioning research to operations. Products generated by this space environments and effects application are suitable for use in anomaly investigations. This paper will outline the four topic areas, describe the need, and discuss an organizational structure for this space environments and effects

  9. Remotex: a new concept for efficient remote operation and maintenance in nuclear fuel reprocessing

    International Nuclear Information System (INIS)

    Feldman, M.J.; White, J.R.

    1980-01-01

    Remotex is a concept of remote operation and maintenance that utilizes advanced manipulator design to improve plant operating efficiency, reduce personnel exposure, and improve safeguards and diversion resistance. It is a concept developed over the past two years in the conceptual design of the Hot Experimental Facility (HEF), a mechanically intense pilot plant facility designed to demonstrate reprocessng technology for early US breeder demonstration reactors. The Remotex concept is directly applicable to all segments of nuclear and nonnuclear industries where work tasks or conditions exist that are hazardous to the health of man

  10. Reactor operation monitor

    International Nuclear Information System (INIS)

    Sakagami, Masaharu.

    1982-01-01

    Purpose: To improve the working performance of a reactor by extending the range for the power conditioning due to the control rod operation and flow rate control. Constitution: The results of calculations for the power distribution and the burn-up degree distribution of the reactor core from a reactor performance computer that processes each of measuring signals in a nuclear power plant are used as the inputs for a computing device of the fuel rod power hysteresis to form the power hysteresis for each of the fuel rods up to the present time. The data are used as the inputs for the computing device of the fuel rod performance index, and the fuel rod performance index representing the critical values for the stresses in the fuel rod cladding tubes and the critical values for the duration of the stresses determined from the power hysteresis and the burn-up degree of the fuel rod are calculated for each of the fuel rods. Accordingly, the power conditioning can be carried out upon power-up in the reactor while monitoring the fuel rod performance index f(t) for each of the fuel assemblies, whereby the range for the power conditioning due to the control rod operation and the flow rate control can be extended relative to fuel assemblies in which f(t) is smaller than 1. (Yoshino, Y.)

  11. MULTILANGUAGE WEBSITE CONCEPT FOR OPERATIONAL IT RISK RESEARCH

    OpenAIRE

    Romānovs, Andrejs; Lektauers, Arnis; Merkurjevs, Jurijs; Klimovs, Ruslans

    2015-01-01

    The paper presents an approach of researches effective organization in sphere of operational IT risk governance. For this purpose, the application of digital multilanguage research area is advised, which can simplify discussion processes for users/researchers from different countries. The concept of multilanguage website is developed based on performed analysis of following modern IT application trends of website development: Web 2.0., social networks, blogs, wiki, etc. Then, practical soluti...

  12. System and operations concept for the Geostationary Earth Observatory data and information system

    International Nuclear Information System (INIS)

    Weinstein, F.C.; Messing, F.; Armstead, A.

    1992-03-01

    The Geostationary Earth Observatory (GEO) Data and Information System (GEODIS) is a critical element in achieving GEO program goals. GEODIS must collect, process, and disseminate scientific data to meet the challenges of NASA's Mission to Planet Earth. The system and operations concept for GEODIS described here summarizes its principal functional elements and external interfaces. GEODIS operations include mission support (of the GEO platform and instruments), data production (of multiple levels of products derived from GEO sensor data), user support (in accessing this data both from archives and directly via satellite rebroadcast links), and institutional support (for communications, management, development, and testing). This concept is part of a baseline generated for Marshall Space Flight Center to define the preliminary architecture of GEODIS. After validation by scientists, managers, operators, and developers, these concepts may be used to guide future work in defining detailed requirements and designs for GEODIS. 6 refs

  13. Gamma ampersand beta-gamma storm water monitor operability

    International Nuclear Information System (INIS)

    Tshiskiku, E.M.

    1993-01-01

    High Level Waste (HLW) facilities have nine storm water monitors that monitor storm water run off from different process areas for Cesium 137, a Gamma emitter. F - Area has three monitors: 907-2F, 907-3F and 907-4F while H - Area has six monitors: 907-2H, 907-3H, 907-4H, 907-5H, 907-6H and 907-7H (See attachments number-sign 1, number-sign 2 and number-sign 3 for location). In addition to monitoring for Cesium, 907-6H and 907-7H monitor for Strontium-90, a Beta emitter. Each monitor is associated with one of the following diversion gate encasements 907-1H, 241-15H, 241-51H, 907-1F or 241-23F. Normal flow of storm water from these diversion gate encasements is to the Four Mile Creek. When a storm water monitor detects radioactivity at a level exceeding the Four Mile Creek discharge limit, the monitor causes repositioning of the associated diversion gate to discharge to the H - Area retention basin 281-8H or the F - Area retention basin 281-8F. In response to recent OSR interpretation of storm water monitor calibration requirements, this report is provided to document operability and accuracy of radiation detection

  14. 76 FR 21789 - ITS Joint Program Office; Vehicle to Infrastructure Core System Concept of Operations; Notice of...

    Science.gov (United States)

    2011-04-18

    ... Concept of Operations; Notice of Public Meeting AGENCY: Research and Innovative Technology Administration...) Core System Concept of Operations on May 17, 2011 at the Detroit Metro Airport Marriott, 30559 Flynn... to work originally performed under the Vehicle Infrastructure Integration Proof of Concept (VII POC...

  15. DEVELOPMENT OF OPERATIONAL CONCEPTS FOR ADVANCED SMRs: THE ROLE OF COGNITIVE SYSTEMS ENGINEERING

    Energy Technology Data Exchange (ETDEWEB)

    Jacques Hugo; David Gertman

    2014-04-01

    Advanced small modular reactors (AdvSMRs) will use advanced digital instrumentation and control systems, and make greater use of automation. These advances not only pose technical and operational challenges, but will inevitably have an effect on the operating and maintenance (O&M) cost of new plants. However, there is much uncertainty about the impact of AdvSMR designs on operational and human factors considerations, such as workload, situation awareness, human reliability, staffing levels, and the appropriate allocation of functions between the crew and various automated plant systems. Existing human factors and systems engineering design standards and methodologies are not current in terms of human interaction requirements for dynamic automated systems and are no longer suitable for the analysis of evolving operational concepts. New models and guidance for operational concepts for complex socio-technical systems need to adopt a state-of-the-art approach such as Cognitive Systems Engineering (CSE) that gives due consideration to the role of personnel. This approach we report on helps to identify and evaluate human challenges related to non-traditional concepts of operations. A framework - defining operational strategies was developed based on the operational analysis of Argonne National Laboratory’s Experimental Breeder Reactor-II (EBR-II), a small (20MWe) sodium-cooled reactor that was successfully operated for thirty years. Insights from the application of the systematic application of the methodology and its utility are reviewed and arguments for the formal adoption of CSE as a value-added part of the Systems Engineering process are presented.

  16. Experience gained from the operation of two α-monitors in ''PUTE''

    International Nuclear Information System (INIS)

    Groll, P.; Persohn, M.; Roeder, L.; Roemer, J.; Schuler, B.

    1983-04-01

    The operation of two α-monitors of the ''drum-cell''-type in the plutonium facility ''PUTE'' is described. The instruments were installed in the AW- and the BW-stream. After a short description of the monitor, the different operating modes and of installation details, the experience gained from two weeks of continuous operation is described. The advantages of the use of in-line-instruments compared with laboratory analyses of samples are discussed. The instruments were available for 97 or 94% of the time. (orig.) [de

  17. 40 CFR 63.2164 - If I monitor brew ethanol, what are my monitoring installation, operation, and maintenance...

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 12 2010-07-01 2010-07-01 true If I monitor brew ethanol, what are my... monitor brew ethanol, what are my monitoring installation, operation, and maintenance requirements? (a... considered by us to be generally optimum. Use the brew-to-exhaust correlation equation established under § 63...

  18. Sterilization Monitoring management of the integration of the operating room with CSSD

    Directory of Open Access Journals (Sweden)

    Shu-yan XIA

    2014-08-01

    Full Text Available Objective: Explore the Sterilization Monitoring management of the integration of the operating room with CSSD. Methods: Compare sterilization process monitoring with biological monitoring and chemical monitoring. Results: The management in Biological monitoring, chemical monitoring and sterilization process monitoring is crucial. Conclusion: Sterilization monitoring is to ensure the safe use of sterile goods so as to protect the safety of surgical patients.

  19. Monitoring and operation system for severe accidents

    International Nuclear Information System (INIS)

    Fukui, Toshiki; Niida, Shinji; Kato, Yumeto

    2017-01-01

    Monitoring and operation system for Severe Accidents (SA-MOS) is a compact Instrumentation and Control (I and C) system developed by Mitsubishi Heavy Industries (MHI) and certificated by the Japanese Nuclear Regulatory Agency (NRA) as a design application for Japanese existing PWR nuclear power plants. The system is tailored to provide monitoring and operation for Severe Accident (SA) conditions, and consists of digitalized I and C System, Human Systems Interface (HSI) system and Power Supply (PS) system as further improvement of reliability and safety. This design plans to be applied to the next Japanese PWR plants. In accordance with the new regulatory standards that NRA has established corresponding to the Fukushima accident, a long-term Station Black Out (SBO) scenario and 24-hours power supply by the storage battery in case of SA has been required. In order to address 24-hours power supply requirement in SA condition, the storage battery volume shall be increased. However, it may be difficult to introduce additional batteries to the existing plant site because of room space constraints, etc. Therefore, power distributions for the facilities which are only used for Design Basis Accident (DBA), are shut down in order to secure 24-hours operations of facilities for SA conditions including SA-MOS. That enables efficient battery resource operations as well as optimizes room space factors shared by battery cabinets. Another benefit is to introduce dedicate HSI system for SA condition and operators shift their operations using that dedicated HSI system to cope with SA events. That can reduce operator workload which forces operators to verify or choose which controllers and indicators are available in SA conditions. Furthermore, application of SA-MOS, secures the independence of the layers (DBA⇔SA) as well as secures the plant data transfer for SA conditions outside of plant. Those plant data assets can be shared by plant operation supporting personnel and

  20. Cross support overview and operations concept for future space missions

    Science.gov (United States)

    Stallings, William; Kaufeler, Jean-Francois

    1994-01-01

    Ground networks must respond to the requirements of future missions, which include smaller sizes, tighter budgets, increased numbers, and shorter development schedules. The Consultative Committee for Space Data Systems (CCSDS) is meeting these challenges by developing a general cross support concept, reference model, and service specifications for Space Link Extension services for space missions involving cross support among Space Agencies. This paper identifies and bounds the problem, describes the need to extend Space Link services, gives an overview of the operations concept, and introduces complimentary CCSDS work on standardizing Space Link Extension services.

  1. Towards a global monitoring system for CMS computing operations

    CERN Multimedia

    CERN. Geneva; Bauerdick, Lothar A.T.

    2012-01-01

    The operation of the CMS computing system requires a complex monitoring system to cover all its aspects: central services, databases, the distributed computing infrastructure, production and analysis workflows, the global overview of the CMS computing activities and the related historical information. Several tools are available to provide this information, developed both inside and outside of the collaboration and often used in common with other experiments. Despite the fact that the current monitoring allowed CMS to successfully perform its computing operations, an evolution of the system is clearly required, to adapt to the recent changes in the data and workload management tools and models and to address some shortcomings that make its usage less than optimal. Therefore, a recent and ongoing coordinated effort was started in CMS, aiming at improving the entire monitoring system by identifying its weaknesses and the new requirements from the stakeholders, rationalise and streamline existing components and ...

  2. Marine: a new wide range neutron monitoring system concept

    Energy Technology Data Exchange (ETDEWEB)

    Trama, J.C.; Lescop, B.; Lefevre, J.; Nguyen, T.; Sudres, C. [CEA Saclay, 91 - Gif sur Yvette (France). Dept. d' Electronique et d' Instrumentation Nucleaire; Pasdeloup, P. [Technicatome, 13 - Les Milles (France)

    2001-07-01

    In a Nuclear Power Plant, the developed power is proportional to the emitted neutron flux. The 10 to 11 decades measurement range from source to power generally needs 3 distinct neutron measurement chains to be monitored. A wide range neutron monitoring system may cover this range with only one sensor followed by adequate electronics. In the past this concept has been developed with an analogue technology which was presenting some drawbacks (slow log amplifier, components perenniality). In this paper, we introduce a completely new design, that makes use of a recent technology, including full linear input electronics, and advanced digital signal processing. As far as the sensor is concerned, both a well known commercial fission chamber, or an innovative wide range sensor presenting a high sensitivity may be used. The basic concept is that the single signal is continuously processed by three different electronic stages, each one being dedicated to approximately one third of the full range: pulse, Campbelling and current modes. After amplification, appropriate shaping, this signal is numerically filtered by a Kalman filter algorithm to compute the neutron flux as well as the reactor period. A specifically developed test module allows the surveillance of the sensor and the electronics via stimuli injections and characteristic curves plotting. A computerised simulation of the whole chain is used to validate the signal processing algorithms evolutions. In the paper we will specifically develop the metrological performances of this chain and the general agreement that exists between simulated and measured values. (authors)

  3. Testing Template and Testing Concept of Operations for Speaker Authentication Technology

    National Research Council Canada - National Science Library

    Sipko, Marek M

    2006-01-01

    This thesis documents the findings of developing a generic testing template and supporting concept of operations for speaker verification technology as part of the Iraqi Enrollment via Voice Authentication Project (IEVAP...

  4. Evaluation of innovative operation concept for flat sheet MBR filtration system.

    Science.gov (United States)

    Weinrich, L; Grélot, A

    2008-01-01

    One of the most limiting factors for the extension and acceptance of MBR filtration systems for municipal and industrial wastewater is the impact of membrane fouling on maintenance, operation and cleaning efforts. One field of action in the European Research Project "AMEDEUS" is the development and testing of MBR module concepts with innovative fouling-prevention technology from three European module manufacturers. This article deals with the performances of the flat-sheet modules by A3 Water Solutions GmbH in double-deck configuration evaluated over 10 months in Anjou Recherche under typical biological operation conditions for MBR systems (MLSS = 10 g/l; SRT = 25 days). By using a double-deck configuration, it is possible to operate with a net flux of 25.5 l/m2.h at 20 degrees C, a membrane air flow rate of 0.21 Nm3/h.m2 of membrane to achieve a stable permeability of around 500-600 l/m2.h.bar. Additionally, it was observed that it is possible to recover the membrane performance after biofouling during operation without intensive cleaning and to maintain stable permeability during peak flows. The evaluated concepts for equipping and operating MBR systems will be applied to several full-scale plants constructed by A3 Water Solutions GmbH.

  5. Groundwater Monitoring Plan for the Reactor Technology Complex Operable Unit 2-13

    International Nuclear Information System (INIS)

    Richard P. Wells

    2007-01-01

    This Groundwater Monitoring Plan describes the objectives, activities, and assessments that will be performed to support the on-going groundwater monitoring requirements at the Reactor Technology Complex, formerly the Test Reactor Area (TRA). The requirements for groundwater monitoring were stipulated in the Final Record of Decision for Test Reactor Area, Operable Unit 2-13, signed in December 1997. The monitoring requirements were modified by the First Five-Year Review Report for the Test Reactor Area, Operable Unit 2-13, at the Idaho National Engineering and Environmental Laboratory to focus on those contaminants of concern that warrant continued surveillance, including chromium, tritium, strontium-90, and cobalt-60. Based upon recommendations provided in the Annual Groundwater Monitoring Status Report for 2006, the groundwater monitoring frequency was reduced to annually from twice a year

  6. Design of safety monitor system for operation sintering furnace ME-06

    International Nuclear Information System (INIS)

    Sugeng Rianto; Triarjo; Djoko Kisworo; Agus Sartono

    2013-01-01

    Design of safety monitoring system for safety operation of sinter furnace ME-06 has been done. Parameters monitored during this operation include: temperature, gas pressure, flow rate of gas, voltage and current furnace. For sintering furnace temperature system that monitored were the temperature of the furnace temperature, the temperature of the cooling water system inlet and outlet, temperature of flow hydrogen gas inlet and outlet. For pressure system and flow rate gas sinter furnace which monitored the pressure and flow rate of hydrogen gas inlet and outlet. The system also monitors current and voltage applied to the sinter furnace heating system. Monitor system hardware consists of: the system temperature sensor, pressure, rate and data acquisition systems. While software systems using the labview driver interface that connects the hard and software systems. Function test results during sintering operation for setting the temperature 1700 °C sintering temperature increases the ramp function by 250 °C/hour average measurements obtained when the sintering time 1707.016 °C with a standard deviation of 0.38 °C. The maximum temperature of the hydrogen gas temperature 35.4 °C. The maximum temperature of the cooling water system 27.4 °C. The maximum pressure of 1,911 bar Gas Inlet and outlet of 0,051 bar. Maximum inlet gas flow 12.996 L / min and outlet 14.086 L / min. (author)

  7. A guidebook for the operation and maintenance of HANARO seismic monitoring analysis system

    Energy Technology Data Exchange (ETDEWEB)

    Ryu, Jeong Soo; Yoon, Doo Byung; Kim, Hyung Kyoo

    2003-09-01

    Systems and structures related to HANARO safety are classified as seismic category I. Since 1995, the seismic monitoring system has been utilized for monitoring an earthquake at the HANARO site. The existing seismic monitoring system consists of field sensors and monitoring panel. The analog-type monitoring system with magnetic tape recorder is out-of-date model. In addition, the disadvantage of the existing system is that it does not include signal-analyzing equipment. Therefore, we have improved the analog seismic monitoring system into a new digital Seismic Monitoring Analysis System(SMAS) that can offer precise and detail information of the earthquake signals. This newly developed SMAS is operating at the HANARO instrument room to acquire and analyze the signal of an earthquake. This document is a guidebook for the operation and maintenance of the SMAS. The first chapter gives an outline of the SMAS. The second chapter describes functional capability and specification of the hardware. Chapters 3 and 4 describe starting procedure of the SMAS and how to operate the seismic monitoring program, respectively. Chapter 5 illustrates the seismic analysis algorithm used in the SMAS. The way of operating the seismic analysis program is described in chapter 6. Chapter 7 illustrates the calibration procedure for data acquisition module. Chapter 8 describes the symptoms of common malfunctions and its countermeasure suited to the occasions.

  8. Operant Conditioning Concepts in Introductory Psychology Textbooks and Their Companion Web Sites

    Science.gov (United States)

    Sheldon, Jane P.

    2002-01-01

    Psychology instructors and textbook authors rate operant conditioning as one of the most essential concepts for students to learn, yet textbook writers, as well as students, can fall prey to misconceptions. This study is a content analysis of the presentation of operant conditioning in introductory psychology textbooks and their companion Web…

  9. Evaluating Fault Management Operations Concepts for Next-Generation Spacecraft: What Eye Movements Tell Us

    Science.gov (United States)

    Hayashi, Miwa; Ravinder, Ujwala; McCann, Robert S.; Beutter, Brent; Spirkovska, Lily

    2009-01-01

    Performance enhancements associated with selected forms of automation were quantified in a recent human-in-the-loop evaluation of two candidate operational concepts for fault management on next-generation spacecraft. The baseline concept, called Elsie, featured a full-suite of "soft" fault management interfaces. However, operators were forced to diagnose malfunctions with minimal assistance from the standalone caution and warning system. The other concept, called Besi, incorporated a more capable C&W system with an automated fault diagnosis capability. Results from analyses of participants' eye movements indicate that the greatest empirical benefit of the automation stemmed from eliminating the need for text processing on cluttered, text-rich displays.

  10. Nuclear power plant control room operator control and monitoring tasks

    International Nuclear Information System (INIS)

    Bovell, C.R.; Beck, M.G.; Carter, R.J.

    1998-01-01

    Oak Ridge National Laboratory is conducting a research project the purpose of which is to develop the technical bases for regulatory review criteria for use in evaluating the safety implications of human factors associated with the use of artificial intelligence and expert systems, and with advanced instrumentation and control (I and C) systems in nuclear power plants (NPP). This report documents the results from Task 8 of that project. The primary objectives of the task was to identify the scope and type of control and monitoring tasks now performed by control-room operators. Another purpose was to address the types of controls and safety systems needed to operate the nuclear plant. The final objective of Task 8 was to identify and categorize the type of information and displays/indicators required to monitor the performance of the control and safety systems. This report also discusses state-of-the-art controls and advanced display devices which will be available for use in control-room retrofits and in control room of future plants. The fundamental types of control and monitoring tasks currently conducted by operators can be divided into four classifications: function monitoring tasks, control manipulation tasks, fault diagnostic tasks, and administrative tasks. There are three general types of controls used in today's NPPs, switches, pushbuttons, and analog controllers. Plant I and C systems include components to achieve a number of safety-related functions: measuring critical plant parameters, controlling critical plant parameters within safety limits, and automatically actuating protective devices if safe limits are exceeded. The types of information monitored by the control-room operators consist of the following parameters: pressure, fluid flow and level, neutron flux, temperature, component status, water chemistry, electrical, and process and area radiation. The basic types of monitoring devices common to nearly all NPP control rooms include: analog meters

  11. Draft Function Allocation Framework and Preliminary Technical Basis for Advanced SMR Concepts of Operations

    Energy Technology Data Exchange (ETDEWEB)

    Jacques Hugo; John Forester; David Gertman; Jeffrey Joe; Heather Medema; Julius Persensky; April Whaley

    2013-04-01

    This report presents preliminary research results from the investigation in to the development of new models and guidance for concepts of operations (ConOps) in advanced small modular reactor (aSMR) designs. In support of this objective, three important research areas were included: operating principles of multi-modular plants, functional allocation models and strategies that would affect the development of new, non-traditional concept of operations, and the requiremetns for human performance, based upon work domain analysis and current regulatory requirements. As part of the approach for this report, we outline potential functions, including the theoretical and operational foundations for the development of a new functional allocation model and the identification of specific regulatory requirements that will influence the development of future concept of operations. The report also highlights changes in research strategy prompted by confirmationof the importance of applying the work domain analysis methodology to a reference aSMR design. It is described how this methodology will enrich the findings from this phase of the project in the subsequent phases and help in identification of metrics and focused studies for the determination of human performance criteria that can be used to support the design process.

  12. Monitoring of large steam turbines, as seen by the constructor and the operator

    International Nuclear Information System (INIS)

    Blanchet, J.M.; Bourcier, P.B.; Malherbe, C.

    1986-01-01

    The electricity in France is produced by large steam turbines in the range of 125 000 kW to 1 300 000 kW in nuclear power plants. Some operation problems are encountered on these large machines. The aim of this study is to justify and to describe the monitoring process implemented on the large steam turbines. This short study is divided into three parts: the monitoring justification during the start-up period, one example of a monitoring system, the turbine monitoring during the operation period [fr

  13. SARDA: An Integrated Concept for Airport Surface Operations Management

    Science.gov (United States)

    Gupta, Gautam; Hoang, Ty; Jung, Yoon Chul

    2013-01-01

    The Spot and Runway Departure Advisor (SARDA) is an integrated decision support tool for airlines and air traffic control tower enabling surface collaborative decision making (CDM) and departure metering in order to enhance efficiency of surface operations at congested airports. The presentation describes the concept and architecture of the SARDA as a CDM tool, and the results from a human-in-the-loop simulation of the tool conducted in 2012 at the FutureFlight Central, the tower simulation facility. Also, presented is the current activities and future plan for SARDA development. The presentation was given at the meeting with the FAA senior advisor of the Surface Operations Office.

  14. Automation of metrological operations on measuring apparatuses of radiation monitoring system

    International Nuclear Information System (INIS)

    Kulich, V.; Studeny, J.

    1995-01-01

    (J.K.)In this paper the measuring apparatuses of ionizing radiation for the radiation monitoring of NPP Dukovany operation is described. The increase of metrological operations number has been made possible only by a timely reconstruction of the laboratory and by computerization of the measuring procedure and of administrative work which consists mainly of recording of a great number information pieces about the observed measuring apparatuses. There are three working places in the laboratory: 1) irradiation gamma stand with cesium-137 sources; 2) irradiation stand with plutonium-beryllium neutron sources; 3) spectrometric working place. With the regard to the uniqueness of the laboratory operation, all the works in the sphere of hardware as well as software has been implemented by own forces. The equipment of the laboratory makes possible to test metrologically all the radiation monitoring apparatuses used in NPP Dukovany. The quantity of operation of he laboratory of ionizing metrology qualifies the proper functioning of the radiation monitoring system, which directly influences the ensurance of nuclear safety of NPP Dukovany

  15. Automation of metrological operations on measuring apparatuses of radiation monitoring system

    Energy Technology Data Exchange (ETDEWEB)

    Kulich, V; Studeny, J [NPP Dukovany (Czech Republic)

    1996-12-31

    (J.K.)In this paper the measuring apparatuses of ionizing radiation for the radiation monitoring of NPP Dukovany operation is described. The increase of metrological operations number has been made possible only by a timely reconstruction of the laboratory and by computerization of the measuring procedure and of administrative work which consists mainly of recording of a great number information pieces about the observed measuring apparatuses. There are three working places in the laboratory: 1) irradiation gamma stand with cesium-137 sources; 2) irradiation stand with plutonium-beryllium neutron sources; 3) spectrometric working place. With the regard to the uniqueness of the laboratory operation, all the works in the sphere of hardware as well as software has been implemented by own forces. The equipment of the laboratory makes possible to test metrologically all the radiation monitoring apparatuses used in NPP Dukovany. The quantity of operation of he laboratory of ionizing metrology qualifies the proper functioning of the radiation monitoring system, which directly influences the ensurance of nuclear safety of NPP Dukovany.

  16. Learning neuroendoscopy with an exoscope system (video telescopic operating monitor): Early clinical results.

    Science.gov (United States)

    Parihar, Vijay; Yadav, Y R; Kher, Yatin; Ratre, Shailendra; Sethi, Ashish; Sharma, Dhananjaya

    2016-01-01

    Steep learning curve is found initially in pure endoscopic procedures. Video telescopic operating monitor (VITOM) is an advance in rigid-lens telescope systems provides an alternative method for learning basics of neuroendoscopy with the help of the familiar principle of microneurosurgery. The aim was to evaluate the clinical utility of VITOM as a learning tool for neuroendoscopy. Video telescopic operating monitor was used 39 cranial and spinal procedures and its utility as a tool for minimally invasive neurosurgery and neuroendoscopy for initial learning curve was studied. Video telescopic operating monitor was used in 25 cranial and 14 spinal procedures. Image quality is comparable to endoscope and microscope. Surgeons comfort improved with VITOM. Frequent repositioning of scope holder and lack of stereopsis is initial limiting factor was compensated for with repeated procedures. Video telescopic operating monitor is found useful to reduce initial learning curve of neuroendoscopy.

  17. Verifiable process monitoring through enhanced data authentication

    International Nuclear Information System (INIS)

    Goncalves, Joao G.M.; Schwalbach, Peter; Schoeneman, Barry Dale; Ross, Troy D.; Baldwin, George Thomas

    2010-01-01

    To ensure the peaceful intent for production and processing of nuclear fuel, verifiable process monitoring of the fuel production cycle is required. As part of a U.S. Department of Energy (DOE)-EURATOM collaboration in the field of international nuclear safeguards, the DOE Sandia National Laboratories (SNL), the European Commission Joint Research Centre (JRC) and Directorate General-Energy (DG-ENER) developed and demonstrated a new concept in process monitoring, enabling the use of operator process information by branching a second, authenticated data stream to the Safeguards inspectorate. This information would be complementary to independent safeguards data, improving the understanding of the plant's operation. The concept is called the Enhanced Data Authentication System (EDAS). EDAS transparently captures, authenticates, and encrypts communication data that is transmitted between operator control computers and connected analytical equipment utilized in nuclear processes controls. The intent is to capture information as close to the sensor point as possible to assure the highest possible confidence in the branched data. Data must be collected transparently by the EDAS: Operator processes should not be altered or disrupted by the insertion of the EDAS as a monitoring system for safeguards. EDAS employs public key authentication providing 'jointly verifiable' data and private key encryption for confidentiality. Timestamps and data source are also added to the collected data for analysis. The core of the system hardware is in a security enclosure with both active and passive tamper indication. Further, the system has the ability to monitor seals or other security devices in close proximity. This paper will discuss the EDAS concept, recent technical developments, intended application philosophy and the planned future progression of this system.

  18. Assessing and addressing increased stakeholder and operator information needs in nuclear fuel cycle facilities: two concepts

    Energy Technology Data Exchange (ETDEWEB)

    Saltiel, David H. [Sandia National Laboratories, Albuquerque (United States)

    2007-12-15

    Nuclear energy programs around the world increasingly find themselves at the nexus of potentially conflicting demands from both domestic and international stakeholders. On one side, the rapid growth in demand for electricity coupled with the goal of reducing carbon emissions calls for a significant expansion of nuclear energy. On the other, stakeholders are seeking ever greater safety, environmental, security, and nonproliferation assurances before consenting to the construction of new nuclear energy facilities. Satisfying the demand for clean energy supplies will require nuclear energy operators to find new and innovative ways to build confidence among stakeholders. This paper discusses two related concepts which can contribute to meeting the needs of key stakeholders in cost effective and efficient ways. Structured processes and tools for assessing stakeholder needs can build trust and confidence while facilitating the 'designing-in' of information collection systems for new facilities to achieve maximum efficiency and effectiveness. Integrated approaches to monitoring facilities and managing the resulting data can provide stakeholders with continued confidence while offering operators additional facility and process information to improve performance.

  19. Assessing and addressing increased stakeholder and operator information needs in nuclear fuel cycle facilities: two concepts

    International Nuclear Information System (INIS)

    Saltiel, David H.

    2007-01-01

    Nuclear energy programs around the world increasingly find themselves at the nexus of potentially conflicting demands from both domestic and international stakeholders. On one side, the rapid growth in demand for electricity coupled with the goal of reducing carbon emissions calls for a significant expansion of nuclear energy. On the other, stakeholders are seeking ever greater safety, environmental, security, and nonproliferation assurances before consenting to the construction of new nuclear energy facilities. Satisfying the demand for clean energy supplies will require nuclear energy operators to find new and innovative ways to build confidence among stakeholders. This paper discusses two related concepts which can contribute to meeting the needs of key stakeholders in cost effective and efficient ways. Structured processes and tools for assessing stakeholder needs can build trust and confidence while facilitating the 'designing-in' of information collection systems for new facilities to achieve maximum efficiency and effectiveness. Integrated approaches to monitoring facilities and managing the resulting data can provide stakeholders with continued confidence while offering operators additional facility and process information to improve performance

  20. Using Powerpoint Animations to Teach Operations Management Techniques and Concepts

    Science.gov (United States)

    Treleven, Mark D.; Penlesky, Richard J.; Callarman, Thomas E.; Watts, Charles A.; Bragg, Daniel J.

    2014-01-01

    This article examines the value of using complex animated PowerPoint presentations to teach operations management techniques and concepts. To provide context, literature covering the use of PowerPoint animations in business education is briefly reviewed. The specific animations employed in this study are identified and their expected benefits to…

  1. Work Domain Analysis Methodology for Development of Operational Concepts for Advanced Reactors

    Energy Technology Data Exchange (ETDEWEB)

    Hugo, Jacques [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2015-05-01

    This report describes a methodology to conduct a Work Domain Analysis in preparation for the development of operational concepts for new plants. This method has been adapted from the classical method described in the literature in order to better deal with the uncertainty and incomplete information typical of first-of-a-kind designs. The report outlines the strategy for undertaking a Work Domain Analysis of a new nuclear power plant and the methods to be used in the development of the various phases of the analysis. Basic principles are described to the extent necessary to explain why and how the classical method was adapted to make it suitable as a tool for the preparation of operational concepts for a new nuclear power plant. Practical examples are provided of the systematic application of the method and the various presentation formats in the operational analysis of advanced reactors.

  2. ESA CAMELOT study: Challenges in future operational missions for GMES atmospheric monitoring, sentinel 4 and 5

    Science.gov (United States)

    Levelt, P.; Veefkind, P.

    2009-04-01

    Dedicated atmospheric chemistry observations from space have been made for over 30 years now, starting with the SBUV and TOMS measurements of the ozone layer. Since then huge progress has been made, improving the accuracy of the measurements, extending the amount of constituents, and by sensing not only the stratosphere, but the last five to ten years also the troposphere. The potential to operational monitor the atmosphere, following the meteorological community, came within reach. At the same time, the importance for society of regular operational environmental measurements, related to the ozone layer, air quality and climate change, became apparent, amongst others resulting in the EU initiative Global Monitoring for Environment and Security (GMES) In order to prepare the operational missions in the context of the GMES, ESA took the initiative to further study the user requirements for the Sentinel 4 and 5 (precursor) missions. The Sentinel 4 and 5 (precursor) missions are dedicated operational missions to monitor the atmospheric composition in the 2013-2020 timeframe and onward. The user requirements for the sentinel missions focus on monitoring the atmosphere from an environmental point of view (ozone layer, air quality and climate). ESA's CAMELOT (Composition of the Atmospheric Mission concEpts and SentineL Observation Techniques) study is the follow-on study to ESA's CAPACITY study finished in 2005. The general objective of the CAMELOT study is to further contribute to the definition of the air quality and climate protocol monitoring parts of the GMES Sentinel 4 and 5 missions. Key issues in the CAMELOT study are: • trade-offs between different observation strategies (spectral ranges, polarisation, direction etc) for aerosols and several trace gases • a quantitative assessment of the requirements for spatio-temporal sampling taking into account the contamination of nadir-viewing observations by cloud • optimising several orbit scenario's (leo, inclined

  3. A Validated Task Analysis of the Single Pilot Operations Concept

    Science.gov (United States)

    Wolter, Cynthia A.; Gore, Brian F.

    2015-01-01

    The current day flight deck operational environment consists of a two-person Captain/First Officer crew. A concept of operations (ConOps) to reduce the commercial cockpit to a single pilot from the current two pilot crew is termed Single Pilot Operations (SPO). This concept has been under study by researchers in the Flight Deck Display Research Laboratory (FDDRL) at the National Aeronautics and Space Administration's (NASA) Ames (Johnson, Comerford, Lachter, Battiste, Feary, and Mogford, 2012) and researchers from Langley Research Centers (Schutte et al., 2007). Transitioning from a two pilot crew to a single pilot crew will undoubtedly require changes in operational procedures, crew coordination, use of automation, and in how the roles and responsibilities of the flight deck and ATC are conceptualized in order to maintain the high levels of safety expected of the US National Airspace System. These modifications will affect the roles and the subsequent tasks that are required of the various operators in the NextGen environment. The current report outlines the process taken to identify and document the tasks required by the crew according to a number of operational scenarios studied by the FDDRL between the years 2012-2014. A baseline task decomposition has been refined to represent the tasks consistent with a new set of entities, tasks, roles, and responsibilities being explored by the FDDRL as the move is made towards SPO. Information from Subject Matter Expert interviews, participation in FDDRL experimental design meetings, and study observation was used to populate and refine task sets that were developed as part of the SPO task analyses. The task analysis is based upon the proposed ConOps for the third FDDRL SPO study. This experiment possessed nine different entities operating in six scenarios using a variety of SPO-related automation and procedural activities required to guide safe and efficient aircraft operations. The task analysis presents the roles and

  4. Verification of operating software for cooperative monitoring applications

    International Nuclear Information System (INIS)

    Tolk, K.M.; Rembold, R.K.

    1997-01-01

    Monitoring agencies often use computer based equipment to control instruments and to collect data at sites that are being monitored under international safeguards or other cooperative monitoring agreements. In order for this data to be used as an independent verification of data supplied by the host at the facility, the software used must be trusted by the monitoring agency. The monitoring party must be sure that the software has not be altered to give results that could lead to erroneous conclusions about nuclear materials inventories or other operating conditions at the site. The host might also want to verify that the software being used is the software that has been previously inspected in order to be assured that only data that is allowed under the agreement is being collected. A description of a method to provide this verification using keyed has functions and how the proposed method overcomes possible vulnerabilities in methods currently in use such as loading the software from trusted disks is presented. The use of public key data authentication for this purpose is also discussed

  5. General Purpose Data-Driven Monitoring for Space Operations

    Science.gov (United States)

    Iverson, David L.; Martin, Rodney A.; Schwabacher, Mark A.; Spirkovska, Liljana; Taylor, William McCaa; Castle, Joseph P.; Mackey, Ryan M.

    2009-01-01

    As modern space propulsion and exploration systems improve in capability and efficiency, their designs are becoming increasingly sophisticated and complex. Determining the health state of these systems, using traditional parameter limit checking, model-based, or rule-based methods, is becoming more difficult as the number of sensors and component interactions grow. Data-driven monitoring techniques have been developed to address these issues by analyzing system operations data to automatically characterize normal system behavior. System health can be monitored by comparing real-time operating data with these nominal characterizations, providing detection of anomalous data signatures indicative of system faults or failures. The Inductive Monitoring System (IMS) is a data-driven system health monitoring software tool that has been successfully applied to several aerospace applications. IMS uses a data mining technique called clustering to analyze archived system data and characterize normal interactions between parameters. The scope of IMS based data-driven monitoring applications continues to expand with current development activities. Successful IMS deployment in the International Space Station (ISS) flight control room to monitor ISS attitude control systems has led to applications in other ISS flight control disciplines, such as thermal control. It has also generated interest in data-driven monitoring capability for Constellation, NASA's program to replace the Space Shuttle with new launch vehicles and spacecraft capable of returning astronauts to the moon, and then on to Mars. Several projects are currently underway to evaluate and mature the IMS technology and complementary tools for use in the Constellation program. These include an experiment on board the Air Force TacSat-3 satellite, and ground systems monitoring for NASA's Ares I-X and Ares I launch vehicles. The TacSat-3 Vehicle System Management (TVSM) project is a software experiment to integrate fault

  6. Development of remote operated floor contamination monitor

    International Nuclear Information System (INIS)

    Sreekumar, K.; Gangamohan, M.; Kannan, R.K.; Rajan, S.

    2005-01-01

    Contamination check of floors and walkways in and around Reactor building areas forms an integral part of Radiation Protection Program in Power Stations. Though random swipe check method is adopted for the detection of loose contamination, this method has the disadvantage of leaving the fixed contamination and hotspots undetected. Hence, scanning the area with a sensitive detector, held close to the surface provides positive means for the detection of contamination. Checking large areas and walkways by holding the detector close to the surface involves physical work. Also, areas which are unapproachable due to congestion of equipment, may go uncovered by contamination monitoring in order to eliminate the physical strain involved in such contamination monitoring and to cover unapproachable areas, a small size prototype device that can be operated remotely was fabricated. This device detects contamination instantaneously and accurately. This paper describes design and fabrication of the device used for floor contamination monitoring. (author)

  7. The Small Aircraft Transportation System (SATS), Higher Volume Operations (HVO) Concept and Research

    Science.gov (United States)

    Baxley, B.; Williams, D.; Consiglio, M.; Adams, C.; Abbott, T.

    2005-01-01

    The ability to conduct concurrent, multiple aircraft operations in poor weather at virtually any airport offers an important opportunity for a significant increase in the rate of flight operations, a major improvement in passenger convenience, and the potential to foster growth of operations at small airports. The Small Aircraft Transportation System, (SATS) Higher Volume Operations (HVO) concept is designed to increase capacity at the 3400 non-radar, non-towered airports in the United States where operations are currently restricted to one-in/one-out procedural separation during low visibility or ceilings. The concept s key feature is that pilots maintain their own separation from other aircraft using air-to-air datalink and on-board software within the Self-Controlled Area (SCA), an area of flight operations established during poor visibility and low ceilings around an airport without Air Traffic Control (ATC) services. While pilots self-separate within the SCA, an Airport Management Module (AMM) located at the airport assigns arriving pilots their sequence based on aircraft performance, position, winds, missed approach requirements, and ATC intent. The HVO design uses distributed decision-making, safe procedures, attempts to minimize pilot and controller workload, and integrates with today's ATC environment. The HVO procedures have pilots make their own flight path decisions when flying in Instrument Metrological Conditions (IMC) while meeting these requirements. This paper summarizes the HVO concept and procedures, presents a summary of the research conducted and results, and outlines areas where future HVO research is required. More information about SATS HVO can be found at http://ntrs.nasa.gov.

  8. Online condition monitoring to enable extended operation of nuclear power plants

    International Nuclear Information System (INIS)

    Meyer, Ryan Michael; Bond, Leonard John; Ramuhalli, Pradeep

    2012-01-01

    Safe, secure, and economic operation of nuclear power plants will remain of strategic significance. New and improved monitoring will likely have increased significance in the post-Fukushima world. Prior to Fukushima, many activities were already underway globally to facilitate operation of nuclear power plants beyond their initial licensing periods. Decisions to shut down a nuclear power plant are mostly driven by economic considerations. Online condition monitoring is a means to improve both the safety and economics of extending the operating lifetimes of nuclear power plants, enabling adoption of proactive aging management. With regard to active components (e.g., pumps, valves, motors, etc.), significant experience in other industries has been leveraged to build the science base to support adoption of online condition-based maintenance and proactive aging management in the nuclear industry. Many of the research needs are associated with enabling proactive management of aging in passive components (e.g., pipes, vessels, cables, containment structures, etc.). This paper provides an overview of online condition monitoring for the nuclear power industry with an emphasis on passive components. Following the overview, several technology/knowledge gaps are identified, which require addressing to facilitate widespread online condition monitoring of passive components. (author)

  9. Monitoring of radiation exposure

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-02-01

    The guide specifies the requirements for the monitoring of radiation exposure in instances where radiation is used. In addition to workers, the guide covers students, apprentices and visitors. The guide shall also apply to exposure from natural radiation. However, the monitoring of radiation exposure in nuclear power plants is dealt with in YVL Guide 7.10 and 7.11. The guide defines the concepts relevant to the monitoring of radiation exposure and provides guidelines for determining the necessity of monitoring and subsequently arranging such in different operations. In addition, the guide specifies the criteria for the approval and regulatory control of the dosimetric service.

  10. Monitoring of radiation exposure

    International Nuclear Information System (INIS)

    2000-02-01

    The guide specifies the requirements for the monitoring of radiation exposure in instances where radiation is used. In addition to workers, the guide covers students, apprentices and visitors. The guide shall also apply to exposure from natural radiation. However, the monitoring of radiation exposure in nuclear power plants is dealt with in YVL Guide 7.10 and 7.11. The guide defines the concepts relevant to the monitoring of radiation exposure and provides guidelines for determining the necessity of monitoring and subsequently arranging such in different operations. In addition, the guide specifies the criteria for the approval and regulatory control of the dosimetric service

  11. General Purpose Data-Driven Online System Health Monitoring with Applications to Space Operations

    Science.gov (United States)

    Iverson, David L.; Spirkovska, Lilly; Schwabacher, Mark

    2010-01-01

    Modern space transportation and ground support system designs are becoming increasingly sophisticated and complex. Determining the health state of these systems using traditional parameter limit checking, or model-based or rule-based methods is becoming more difficult as the number of sensors and component interactions grows. Data-driven monitoring techniques have been developed to address these issues by analyzing system operations data to automatically characterize normal system behavior. System health can be monitored by comparing real-time operating data with these nominal characterizations, providing detection of anomalous data signatures indicative of system faults, failures, or precursors of significant failures. The Inductive Monitoring System (IMS) is a general purpose, data-driven system health monitoring software tool that has been successfully applied to several aerospace applications and is under evaluation for anomaly detection in vehicle and ground equipment for next generation launch systems. After an introduction to IMS application development, we discuss these NASA online monitoring applications, including the integration of IMS with complementary model-based and rule-based methods. Although the examples presented in this paper are from space operations applications, IMS is a general-purpose health-monitoring tool that is also applicable to power generation and transmission system monitoring.

  12. The SISMA Project: A pre-operative seismic hazard monitoring system.

    Science.gov (United States)

    Massimiliano Chersich, M. C.; Amodio, A. A. Angelo; Francia, A. F. Andrea; Sparpaglione, C. S. Claudio

    2009-04-01

    chains of processes Processes are bound each other, in the sense that the output of process "A" should be passed as input to process "B". In this case the process "B" must run automatically as soon as the required input is ready. In SISMA this issue is handled with the "data-driven" activation concept allowing specifying that a process should be started as soon as the needed input datum has been made available in the archive. Moreover SISMA may run processes on a "time-driven" base. The infrastructure of SISMA provides a configurable scheduler allowing the user to define the start time and the periodicity of such processes. d) monitoring and control The operator of the system needs to monitor and control every process running in the system. The SISMA infrastructure allows, through its GUI, the user to: view log messages of running and old processes; stop running processes; monitor processes executions; monitor resource status (available ram, network reachability, and available disk space) for every machine in the system. e) compatibility with ESRI Shapefiles Nearly all the SISMA data has some geographic information, and it is useful to integrate it in a Geographic Information System (GIS). Processors output are georeferred, but they are generated as ASCII files in a proprietary format, and thus cannot directly loaded in a GIS. The infrastructures provides a simple framework for adding filters that reads the data in the proprietary format and converts it to ESRI Shapefile format.

  13. BARC-risk monitor- a tool for operational safety assessment in nuclear power plants

    International Nuclear Information System (INIS)

    Vinod, Gopika; Saraf, R.K.; Babar, A.K.; Hadap, Nikhil

    2000-12-01

    Probabilistic safety assessment has become a key tool as on today to identify and understand nuclear power plant vulnerabilities. As a result of the availability of these PSA studies, there is a desire to use them to enhance plant safety and to operate the nuclear stations in the most efficient manner. Risk monitor is a PC based tool, which computes the real time safety level and assists plant personnel to manage day-to-day activities. Risk monitor is a PC based user friendly software tool used for modification and re-analysis of a nuclear power plant. Operation of risk monitor is based on PSA methods for assisting in day to day applications. Risk monitoring programs can assess the risk profile and are used to optimise the operation of nuclear power plants with respect to a minimum risk level over the operating time. This report presents the background activities of risk monitor, its application areas and also gives the status of such tools in international scenarios. The software is based on the PSA model of Kaiga generating station and would be applicable to similar design configuration. (author)

  14. 40 CFR 60.584 - Monitoring of operations and recordkeeping requirements.

    Science.gov (United States)

    2010-07-01

    ... Performance for Flexible Vinyl and Urethane Coating and Printing § 60.584 Monitoring of operations and... continuously measures and records the VOC concentration of the exhaust vent stream from the control device and... other processes. (2) During the performance test, the owner or operator shall determine and record the...

  15. Fire monitoring from space: from research to operation

    Science.gov (United States)

    Pergola, Nicola; Filizzola, Carolina; Corrado, Rosita; Coviello, Irina; lacava, Teodosio; Marchese, Francesco; Mazzeo, Giuseppe; Paciello, Rossana; Tramutoli, Valerio

    2013-04-01

    Each summer fires rage through European forests, burning hundreds of thousands of hectares per year, as a result of the many (up to 60000) forest fires that usually occur annually in Europe. Fires can threaten public health and safety, destroy property and cause economic damages. Despite of their medium extension (the average burnt area is less than 6 ha), much smaller if compared with other regions like the USA and Canada, the number of simultaneous active fires in Europe can be very high, fomented by weather conditions that, especially in summer times and for countries of South Europe, are particularly favourable to a rapid and dramatic development of flames. Fires still are not only a social problem, but also an environmental emergency, producing a continuous impoverishment of forests and possibly indirectly triggering other natural hazards (e.g. making slopes, without the trees action, more prone to landslides). Additionally, there is a general concern about the loss of biodiversity and the contribution to land degradation that fires may cause. Earth Observation satellite systems have been largely tested for fire detection and monitoring from space. Their spectral capability, synoptic view and revisit times can offer an added value in the operational use not only in real time, during fires fighting activities, but also in near-real or delay time during the phases of risk management and mitigation. However, the practice of an actual operational use of satellite products by end-users is still not usual at European level. This work is based on the experience carried out jointly by CNR-IMAA and the National Civil Protection Department (DPC), in the framework of a five-year agreement in which the operational use of an Earth observation satellite system for fires spotting and monitoring is tested. Satellite-based products, developed not only for detecting fires but also for continuously monitoring their evolution in time domain, have been provided to Civil Protection

  16. Integrated environmental monitoring -- prototype demonstration

    International Nuclear Information System (INIS)

    Bryce, R.W.; Vail, L.W.; Hostetler, D.D.; Meyer, P.D.; Carlson, T.J.; Miller, P.L.

    1994-01-01

    Groundwater monitoring is an important activity at US Department of Energy (DOE) sites. Monitoring programs at DOE facilities have evolved in response to operational needs at the facilities, public outcries for information, regulatory requirements, DOE orders, and improvements in monitoring technology. Decisions regarding sampling location, sampling frequency, analyses performed, and other aspects of monitoring network design can have major implications for detecting releases and for making subsequent higher level decisions about facility operation and remediation. The Integrated Environmental Monitoring (IEM) concept is a set of analytical procedures and software tools that can be used to improve monitoring network design decisions. Such decisions include the choice of monitoring locations, sampling frequencies, sensor technologies, and monitored constituents. IEM provides a set of monitoring alternatives that balance the tradeoffs between competing monitoring objectives such as the minimization of cost and the minimization of uncertainty. The alternatives provided are the best available with respect to the monitoring objectives, consistent with the physical and chemical characteristics of the site, and consist with applicable regulatory requirements. The selection of the best monitoring alternative to implement is made by the stakeholders after reviewing the alternatives and tradeoffs produced by the IEM process

  17. Sensors and OBIA synergy for operational monitoring of surface water

    Science.gov (United States)

    Masson, Eric; Thenard, Lucas

    2010-05-01

    This contribution will focus on combining Object Based Image Analysis (i.e. OBIA with e-Cognition 8) and recent sensors (i.e. Spot 5 XS, Pan and ALOS Prism, Avnir2, Palsar) to address the technical feasibility for an operational monitoring of surface water. Three cases of river meandering (India), flood mapping (Nepal) and dam's seasonal water level monitoring (Morocco) using recent sensors will present various application of surface water monitoring. The operational aspect will be demonstrated either by sensor properties (i.e. spatial resolution and bandwidth), data acquisition properties (i.e. multi sensor, return period and near real-time acquisition) but also with OBIA algorithms (i.e. fusion of multi sensors / multi resolution data and batch processes). In the first case of river meandering (India) we will address multi sensor and multi date satellite acquisition to monitor the river bed mobility within a floodplain using an ALOS dataset. It will demonstrate the possibility of an operational monitoring system that helps the geomorphologist in the analysis of fluvial dynamic and sediment budget for high energy rivers. In the second case of flood mapping (Nepal) we will address near real time Palsar data acquisition at high spatial resolution to monitor and to map a flood extension. This ALOS sensor takes benefit both from SAR and L band properties (i.e. atmospheric transparency, day/night acquisition, low sensibility to surface wind). It's a real achievement compared to optical imagery or even other high resolution SAR properties (i.e. acquisition swath, bandwidth and data price). These advantages meet the operational needs set by crisis management of hydrological disasters but also for the implementation of flood risk management plans. The last case of dam surface water monitoring (Morocco) will address an important issue of water resource management in countries affected by water scarcity. In such countries water users have to cope with over exploitation

  18. Inertial Fusion Power Plant Concept of Operations and Maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Anklam, T. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Knutson, B. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Dunne, A. M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Kasper, J. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Sheehan, T. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Lang, D. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Roberts, V. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Mau, D. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2015-01-15

    Parsons and LLNL scientists and engineers performed design and engineering work for power plant pre-conceptual designs based on the anticipated laser fusion demonstrations at the National Ignition Facility (NIF). Work included identifying concepts of operations and maintenance (O&M) and associated requirements relevant to fusion power plant systems analysis. A laser fusion power plant would incorporate a large process and power conversion facility with a laser system and fusion engine serving as the heat source, based in part on some of the systems and technologies advanced at NIF. Process operations would be similar in scope to those used in chemical, oil refinery, and nuclear waste processing facilities, while power conversion operations would be similar to those used in commercial thermal power plants. While some aspects of the tritium fuel cycle can be based on existing technologies, many aspects of a laser fusion power plant presents several important and unique O&M requirements that demand new solutions. For example, onsite recovery of tritium; unique remote material handling systems for use in areas with high radiation, radioactive materials, or high temperatures; a five-year fusion engine target chamber replacement cycle with other annual and multi-year cycles anticipated for major maintenance of other systems, structures, and components (SSC); and unique SSC for fusion target waste recycling streams. This paper describes fusion power plant O&M concepts and requirements, how O&M requirements could be met in design, and how basic organizational and planning issues can be addressed for a safe, reliable, economic, and feasible fusion power plant.

  19. Online remote radiological monitoring during operation of Advance Vitrification System (AVS), Tarapur

    International Nuclear Information System (INIS)

    Deokar, U.V.; Kulkarni, V.V.; Mathew, P.; Khot, A.R.; Singh, K.K.; Kamlesh; Deshpande, M.D.; Kulkarni, Y.

    2010-01-01

    Advanced Vitrification System (AVS) is commissioned for vitrification of high level waste (HLW) by using Joule heated ceramic melter first time in India. The HLW is generated in fuel reprocessing plant. For radiological surveillance of plant, Health Physics Unit (HPU) had installed 37 Area Gamma Monitors (AGM), 7 Continuous Air Monitors (CAM) and all types of personal contamination monitors. Exposure control is a major concern in operating plant. Therefore in addition to installed monitors, we have developed online remote radiation monitoring system to minimize exposures to the surveyor and operator. This also helped in volume reduction of secondary waste. The reliability and accuracy of the online monitoring system is confirmed by calibrating the system by comparing TLD and DRD readings and by theoretical analysis. In addition some modifications were carried in HP instruments to make them user friendly. This paper summarizes different kinds of remote radiological monitoring systems installed for online monitoring of Melter off Gas (MOG) filter, Hood filter, three exhaust filter banks, annulus air sampling and over pack monitoring in AVS. Our online remote monitoring system has helped the plant management to plan in advance for replacement of these filters, which resulted in considerable saving of collective dose. (author)

  20. The GMES Sentinel-5 mission for operational atmospheric monitoring: status and developments

    Science.gov (United States)

    Sierk, Bernd; Bezy, Jean-Loup; Caron, Jerôme; Meynard, Roland; Veihelmann, Ben; Ingmann, Paul

    2017-11-01

    Sentinel-5 is an atmospheric monitoring mission planned in the frame of the joint EU/ESA initiative Global Monitoring for Environment and Security (GMES). The objective of the mission, planned to be launched in 2020, is the operational monitoring of trace gas concentrations for atmospheric chemistry and climate applications.

  1. CLASSIFICATION OF THE MGR OPERATIONS MONITORING AND CONTROL SYSTEM

    International Nuclear Information System (INIS)

    R.J. Garrett

    1999-01-01

    The purpose of this analysis is to document the Quality Assurance (QA) classification of the Monitored Geologic Repository (MGR) Operations Monitoring and Control System structures, systems and components (SSCs) performed by the MGR Safety Assurance Department. This analysis also provides the basis for revision of YMP/90-55Q, Q-List (YMP 1998). The Q-List identifies those MGR SSCs subject to the requirements of DOE/RW-0333P7 ''Quality Assurance Requirements and Description'' (QARD) (DOE 1998)

  2. Concept of Operations for a Virtual Machine for C3I Applications

    National Research Council Canada - National Science Library

    Bagrodia, Rajive

    1997-01-01

    .... This 12-month research endeavor, entitled "Concept of Operations for a Virtual Machine for C31 Applications," examined issues in using a concurrent virtual machine for the design of C31 applications...

  3. Disposal Concepts for Radioactive Waste. Final Report of the Expert Group on Disposal Concepts for Radioactive Waste (EKRA)

    International Nuclear Information System (INIS)

    Wildi, Walter; Dermange, Francois; Appel, Detlef; Buser, Marcos; Eckhardt, Anne; Hufschmied, Peter; Keusen, Hans-Rudolf; Aebersold, Michael

    2000-01-01

    At the beginning of 1999, talks between the Swiss Federal Government, the siting Cantons (Cantons in which nuclear power plants are located and Canton Nidwalden), environmental organisations and the nuclear power plant operators on the lifetime of the existing power plants and solution of the waste management problem failed to reach a satisfactory outcome. In view of this, the Head of the Federal Department for the Environment, Transport, Energy and Communication (UVEK) decided to set up the Expert Group on Disposal Concepts for Radioactive Waste (EKRA) in June 1999. EKRA then worked on providing the background for a comparison of different waste management concepts. The group developed the concept of monitored long-term geological disposal and compared this with geological disposal, interim storage and indefinite storage. The aspects of active and passive safety, monitoring and control, as well as retrievability of waste were at the fore-front of these deliberations. This report presents the conclusions and recommendations of EKRA

  4. Disposal Concepts for Radioactive Waste. Final Report of the Expert Group on Disposal Concepts for Radioactive Waste (EKRA)

    Energy Technology Data Exchange (ETDEWEB)

    Wildi, Walter; Dermange, Francois [Univ. of Geneva, CH-1211 Geneva (Switzerland); Appel, Detlef [PanGeo, Hannover (Germany); Buser, Marcos [Buser and Finger, Zurich (Switzerland); Eckhardt, Anne [Basler and Hofmann, Zurich (Switzerland); Hufschmied, Peter [Emch and Berger, Bern (Switzerland); Keusen, Hans-Rudolf [Geotest, Zollikofen (Switzerland); Aebersold, Michael [Swiss Federal Office of Energy (BFE), CH-3003 Bern (Switzerland)

    2000-01-15

    At the beginning of 1999, talks between the Swiss Federal Government, the siting Cantons (Cantons in which nuclear power plants are located and Canton Nidwalden), environmental organisations and the nuclear power plant operators on the lifetime of the existing power plants and solution of the waste management problem failed to reach a satisfactory outcome. In view of this, the Head of the Federal Department for the Environment, Transport, Energy and Communication (UVEK) decided to set up the Expert Group on Disposal Concepts for Radioactive Waste (EKRA) in June 1999. EKRA then worked on providing the background for a comparison of different waste management concepts. The group developed the concept of monitored long-term geological disposal and compared this with geological disposal, interim storage and indefinite storage. The aspects of active and passive safety, monitoring and control, as well as retrievability of waste were at the fore-front of these deliberations. This report presents the conclusions and recommendations of EKRA.

  5. Concept of Operations for Nuclear Warhead Embedded Sensors

    Energy Technology Data Exchange (ETDEWEB)

    Rockett, P D; Koncher, T R

    2012-05-16

    Embedded arms-control-sensors provide a powerful new paradigm for managing compliance with future nuclear weapons treaties, where deployed warhead numbers will be reduced to 1000 or less. The CONOPS (Concept of Operations) for use with these sensors is a practical tool with which one may help define design parameters, including size, power, resolution, communications, and physical structure. How frequently must data be acquired and must a human be present? Will such data be acquired for only stored weapons or will it be required of deployed weapons as well? Will tactical weapons be subject to such monitoring or will only strategic weapons apply? Which data will be most crucial? Will OSI's be a component of embedded sensor data management or will these sensors stand alone in their data extraction processes? The problem space is massive, but can be constrained by extrapolating to a reasonable future treaty regime and examining the bounded options this scenario poses. Arms control verification sensors, embedded within the warhead case or aeroshell, must provide sufficient but not excessively detailed data, confirming that the item is a nuclear warhead and that it is a particular warhead without revealing sensitive information. Geolocation will be provided by an intermediate transceiver used to acquire the data and to forward the data to a central processing location. Past Chain-of-Custody projects have included such devices and will be primarily responsible for adding such indicators in the future. For the purposes of a treaty regime a TLI will be verified as a nuclear warhead by knowledge of (a) the presence and mass of SNM, (b) the presence of HE, and (c) the reporting of a unique tag ID. All of these parameters can be obtained via neutron correlation measurements, Raman spectroscopy, and fiber optic grating fabrication, respectively. Data from these sensors will be pushed out monthly and acquired nearly daily, providing one of several verification layers in

  6. Operation monitoring and protection method for nuclear reactor

    International Nuclear Information System (INIS)

    Tochihara, Hiroshi.

    1995-01-01

    In an operation and monitoring method for a PWR-type reactor by using a tetra-sected neutron detector, axial off set is defined by neutron detector signals with respect to an average of the reactor core, the upper half of the reactor core, and the lower half of the reactor core. A departure from nucleate boiling (DNBR) is represented by standardized signals, and the DNBR is calculated by using the axial off set of the average of the reactor core, the upper half of the reactor core, and the lower half of the reactor core, and they are graphically displayed. In addition, a thermal flow rate-water channel coefficient is also graphically displayed, and the DNBR and the thermal flow rate-water channel coefficient are restricted based on the display, to determine an allowable operation range. As a result, it is possible to provide an operation monitoring and protection method for nuclear reactor capable of reducing labors and frequencies for the change of protection system setting in a case of using a tetra-sected neutron detector disposed at the outside and, at the same time, protecting each of DNR and the highest linear power or the thermal water coefficient channel. (N.H.)

  7. Evaluation of concepts for monitored retrievable storage of spent nuclear fuel and high-level radioactive waste

    International Nuclear Information System (INIS)

    Triplett, M.B.; Smith, R.I.

    1984-04-01

    The primary mission selected by DOE for the monitored retrieval storage (MRS) system is to provide an alternative means of storage in the event that the repository program is delayed. The MRS concepts considered were the eight concepts included in the MRS Research and Development Report to Congress (DOE 1983). These concepts are: metal cask (stationary and transportable); concrete cask (sealed storage cask); concrete cask-in-trench; field drywell; tunnel drywell; open cycle vault; closed cycle vault; and tunnel rack vault. Conceptual design analyses were performed for the candidate concepts using a common set of design requirements specified in consideration of the MRS mission

  8. Preliminary Concept of Operations for the Spent Fuel Management System--WM2017

    Energy Technology Data Exchange (ETDEWEB)

    Cumberland, Riley M [ORNL; Adeniyi, Abiodun Idowu [ORNL; Howard, Rob L [ORNL; Joseph III, Robert Anthony [ORNL; Jarrell, Joshua J [ORNL; Nutt, Mark [Argonne National Laboratory (ANL)

    2017-01-01

    The Nuclear Fuels Storage and Transportation Planning Project (NFST) within the U.S. Department of Energy s Office of Nuclear Energy is tasked with identifying, planning, and conducting activities to lay the groundwork for developing interim storage and transportation capabilities in support of an integrated waste management system. The system will provide interim storage for commercial spent nuclear fuel (SNF) from reactor sites and deliver it to a repository. The system will also include multiple subsystems, potentially including; one or more interim storage facilities (ISF); one or more repositories; facilities to package and/or repackage SNF; and transportation systems. The project team is analyzing options for an integrated waste management system. To support analysis, the project team has developed a Concept of Operations document that describes both the potential integrated system and inter-dependencies between system components. The goal of this work is to aid systems analysts in the development of consistent models across the project, which involves multiple investigators. The Concept of Operations document will be updated periodically as new developments emerge. At a high level, SNF is expected to travel from reactors to a repository. SNF is first unloaded from reactors and placed in spent fuel pools for wet storage at utility sites. After the SNF has cooled enough to satisfy loading limits, it is placed in a container at reactor sites for storage and/or transportation. After transportation requirements are met, the SNF is transported to an ISF to store the SNF until a repository is developed or directly to a repository if available. While the high level operation of the system is straightforward, analysts must evaluate numerous alternative options. Alternative options include the number of ISFs (if any), ISF design, the stage at which SNF repackaging occurs (if any), repackaging technology, the types of containers used, repository design, component

  9. Integrating Social Media Monitoring Into Public Health Emergency Response Operations.

    Science.gov (United States)

    Hadi, Tamer A; Fleshler, Keren

    2016-10-01

    Social media monitoring for public health emergency response and recovery is an essential response capability for any health department. The value of social media for emergency response lies not only in the capacity to rapidly communicate official and critical incident information, but as a rich source of incoming data that can be gathered to inform leadership decision-making. Social media monitoring is a function that can be formally integrated into the Incident Command System of any response agency. The approach to planning and required resources, such as staffing, logistics, and technology, is flexible and adaptable based on the needs of the agency and size and scope of the emergency. The New York City Department of Health and Mental Hygiene has successfully used its Social Media Monitoring Team during public health emergency responses and planned events including major Ebola and Legionnaires' disease responses. The concepts and implementations described can be applied by any agency, large or small, interested in building a social media monitoring capacity. (Disaster Med Public Health Preparedness. 2016;page 1 of 6).

  10. Integrating SAR and derived products into operational volcano monitoring and decision support systems

    Science.gov (United States)

    Meyer, F. J.; McAlpin, D. B.; Gong, W.; Ajadi, O.; Arko, S.; Webley, P. W.; Dehn, J.

    2015-02-01

    Remote sensing plays a critical role in operational volcano monitoring due to the often remote locations of volcanic systems and the large spatial extent of potential eruption pre-cursor signals. Despite the all-weather capabilities of radar remote sensing and its high performance in monitoring of change, the contribution of radar data to operational monitoring activities has been limited in the past. This is largely due to: (1) the high costs associated with radar data; (2) traditionally slow data processing and delivery procedures; and (3) the limited temporal sampling provided by spaceborne radars. With this paper, we present new data processing and data integration techniques that mitigate some of these limitations and allow for a meaningful integration of radar data into operational volcano monitoring decision support systems. Specifically, we present fast data access procedures as well as new approaches to multi-track processing that improve near real-time data access and temporal sampling of volcanic systems with SAR data. We introduce phase-based (coherent) and amplitude-based (incoherent) change detection procedures that are able to extract dense time series of hazard information from these data. For a demonstration, we present an integration of our processing system with an operational volcano monitoring system that was developed for use by the Alaska Volcano Observatory (AVO). Through an application to a historic eruption, we show that the integration of SAR into systems such as AVO can significantly improve the ability of operational systems to detect eruptive precursors. Therefore, the developed technology is expected to improve operational hazard detection, alerting, and management capabilities.

  11. Computer based core monitoring system for an operating CANDU reactor

    International Nuclear Information System (INIS)

    Yoon, Moon Young; Kwon, O Hwan; Kim, Kyung Hwa; Yeom, Choong Sub

    2004-01-01

    The research was performed to develop a CANDU-6 Core Monitoring System(CCMS) that enables operators to have efficient core management by monitoring core power distribution, burnup distribution, and the other important core variables and managing the past core history for Wolsong nuclear power plant unit 1. The CCMS uses Reactor Fueling Simulation Program(RFSP, developed by AECL) for continuous core calculation by integrating the algorithm and assumptions validated and uses the information taken from Digital Control Computer(DCC) for the purpose of producing basic input data. The CCMS has two modules; CCMS server program and CCMS client program. The CCMS server program performs automatic and continuous core calculation and manages overall output controlled by DataBase Management System. The CCMS client program enables users to monitor current and past core status in the predefined GUI(Graphic-User Interface) environment. For the purpose of verifying the effectiveness of CCMS, we compared field-test data with the data used for Wolsong unit 1 operation. In the verification the mean percent differences of both cases were the same(0.008%), which showed that the CCMS could monitor core behaviors well

  12. Operational environmental monitoring plan for the waste isolation pilot plant

    International Nuclear Information System (INIS)

    Mercer, D.D.; Baker, P.L.; Cockman, J.S.; Fischer, N.T.; Flynn, D.T.; Harvill, J.P.; Knudtsen, K.L.; Louderbough, E.T.

    1989-01-01

    This plan defines the scope and extent of the WIPP effluent and environmental monitoring programs during the facility's operational life. It also discusses the quality assurance/quality control programs which ensure that samples collected and the resulting analytical data are representative of actual conditions at the WIPP site. This plan provides a comprehensive description of environmental activities at WIPP, including: a summary of environmental program information, including an update of the status of environmental permits and compliance activities; a description of the WIPP project and its mission; a description of the local environment, including demographics; a summary of applicable standards and regulatory requirements and brief discussions of potential exposure pathways, routine and accidental releases, and their consequences; a summary of the preoperational environmental monitoring and assessment activities and responses to the requirements (Appendix A) and guidelines presented in the ''Radiological Effluent Monitoring and Environmental Surveillance for US DOE Operations.'' 166 refs., 28 figs., 27 tabs

  13. Standard Hydrogen Monitoring System-D operation and maintenance manual

    International Nuclear Information System (INIS)

    Schneider, T.C.

    1997-01-01

    The purpose of this document is to provide information for the operation and maintenance of the Standard Hydrogen Monitoring System-D (SHMS-D) used in the 200E and 200W area tank farms on the Hanford Site. This provides information specific to the mechanical operation of the system and is not intended to take the place of a Plant Operating Procedure. However, it does provide more information on the system than a Plant Operating Procedure. The intent here is that the system is started up by a technician or engineer who has completed tank farms training course No. 351405, and then the only actions performed by Operations will be routine log taking. If any problems not addressed by the operating procedure are encountered with the unit, engineering should be contacted

  14. Standard hydrogen monitoring system - E operation and maintenance manual

    International Nuclear Information System (INIS)

    Schneider, T.C.

    1997-01-01

    The purpose of this document is to provide information for the operation and maintenance of the Standard Hydrogen Monitoring System- E (SHMS-E) used in the 200E and 20OW area tank farms on the Hanford Site. This provides information specific to the mechanical operation of the system and is not intended to take the place of a Plant Operating Procedure. However, it does provide more information on the system than a Plant Operating Procedure. The intent here is that the system is started up by a technician or engineer who has completed tank farms training course for SHMS, and then the only actions performed by Operations will be routine log taking. If any problems not addressed by the operating procedure are encountered with the unit, engineering should be contacted

  15. Software testing concepts and operations

    CERN Document Server

    Mili, Ali

    2015-01-01

    Explores and identifies the main issues, concepts, principles and evolution of software testing, including software quality engineering and testing concepts, test data generation, test deployment analysis, and software test managementThis book examines the principles, concepts, and processes that are fundamental to the software testing function. This book is divided into five broad parts. Part I introduces software testing in the broader context of software engineering and explores the qualities that testing aims to achieve or ascertain, as well as the lifecycle of software testing. Part II c

  16. Operational transparency: an advanced safeguards strategy for future on-load refuelled reactors

    International Nuclear Information System (INIS)

    Whitlock, J.J.; Trask, D.

    2012-01-01

    The IAEA's system for tracking fuel movement in an on-load refuelled heavy-water reactor is robust, but an opportunity remains to exploit the wealth of data streaming from the reactor vault during operation and provide real-time, third-party monitoring of reactor status and history. This concept of Operational Transparency would require that large amounts of operational data be reduced in near-real time to a small subset of high-level information. Operational Transparency would enhance the IAEA's ability to monitor the state of the core to an unprecedented level. This paper provides an overview of the novel concept of Operational Transparency in heavy water reactors, using potential application to CANDU reactors as an example, and explores some of the technical challenges that will need to be solved for efficient implementation. (author)

  17. A planning concept incorporating the knowledge of both planning and operations personnel

    Energy Technology Data Exchange (ETDEWEB)

    Valenca, M M; Nepomuceno, L; Teixeira, J C.F.; Santos, Junior, A [Universidade Estadual de Campinas, SP (Brazil)

    1994-12-31

    In this paper, the electrical operation planning problem and the available technological possibilities for the improvement of planner`s work process are analyzed. The importance of the expert`s experience in efficient operation plans production is pointed out. The useful knowledge in planning and operating environments and their automation by Artificial Intelligence techniques are evaluated. Finally, conception of a decision-making support system allowing the interaction of storage expertise with analysis programs proposed, in order to improve the planning process. (author) 15 refs., 4 figs.

  18. Space Station Initial Operational Concept (IOC) operations and safety view - Automation and robotics for Space Station

    Science.gov (United States)

    Bates, William V., Jr.

    1989-01-01

    The automation and robotics requirements for the Space Station Initial Operational Concept (IOC) are discussed. The amount of tasks to be performed by an eight-person crew, the need for an automated or directed fault analysis capability, and ground support requirements are considered. Issues important in determining the role of automation for the IOC are listed.

  19. The STAR concept, systems to assist the operator during abnormal events

    International Nuclear Information System (INIS)

    Felkel, L.

    1984-01-01

    Man-machine-communication in electrical power plants is increasingly based on the capabilities of minicomputers. Rather than just displaying raw process data more complex processing is done to aid operators by improving information quality. Advanced operator aids for nuclear power plants are e.g. alarm reduction, disturbance analysis and expert systems. Operator aids use complex combinations and computations of plant signals, which have to be described in a formal and homogeneous way. The design of such computer-based information systems requires extensive software and engineering efforts. The STAR software concept described in this paper, however, reduces the software effort to a minimum by providing an advanced program package which facilitates specification and implementation of engineering know-how necessary for sophisticated operator aids. (orig.)

  20. Guide for the monitoring of radiation protection during national modification and maintenance operations. Report nr 307

    International Nuclear Information System (INIS)

    Bataille, C.; Michelet, M.; Schieber, C.

    2010-02-01

    This methodological guide aims at helping the different involved actors in designing and implementing the monitoring of radiation protection during modification and maintenance operations performed at the national level. It describes actions to be performed by each actor in order to comply with the objectives of the four steps related to the radiation protection monitoring of an operation: the design of the radiation protection monitoring during the study phase, the adaptation of this monitoring to the concerned CNPE (electricity production nuclear centre), the radiation protection monitoring during the operation performance, and the analysis of the return on experience

  1. Navigation and Alignment Aids Concept of Operations and Supplemental Design Information. Revision A

    Science.gov (United States)

    Kelly, Sean M.; Cryan, Scott P.

    2016-01-01

    The IDSS Navigation and Alignment Aids Concept of Operations and Supplemental Design Information document provides supplemental information to the IDSS IDD. The guide provides insight into the navigation and alignment aids design, and how those aids can be utilized by incoming vehicles for proximity operations and docking. The navigation aids are paramount to successful docking.

  2. Shariah Compliance of Wakalah Concept in Takaful Operation: A Case Study of A Takaful Operation in Malaysia

    OpenAIRE

    Nadiah 'Aqilah Mohd Amin; Mohamad Abdul Hamid

    2014-01-01

    Objective – The main objective of this paper is to focus on wakalah model and its impact in takaful operation and   to  evaluate  the  compliance  of  takaful  company  with  shari’ah principles in applying the wakalah concept.Methods – qualitative method which is based on library research. Reference to many books, articles, proceeding papers, handouts, journals, and internet source regarding wakalah by Etiqa Takaful Berhad.Result–The finding of this research shows that the takaful operation ...

  3. Monitoring of operation with artificial intelligence methods; Betriebsueberwachung mit Verfahren der Kuenstlichen Intelligenz

    Energy Technology Data Exchange (ETDEWEB)

    Bruenninghaus, H. [DMT-Gesellschaft fuer Forschung und Pruefung mbH, Essen (Germany). Geschaeftsbereich Systemtechnik

    1999-03-11

    Taking the applications `early detection of fires` and `reduction of burst of messages` as an example, the usability of artificial intelligence (AI) methods in the monitoring of operation was checked in a R and D project. The contribution describes the concept, development and evaluation of solutions to the specified problems. A platform, which made it possible to investigate different AI methods (in particular artificial neuronal networks), had to be creaated as a basis for the project. At the same time ventilation data had to be acquired and processed by the networks for the classification. (orig.) [Deutsch] Am Beispiel der Anwendungsfaelle `Brandfrueherkennung` und `Meldungsschauerreduzierung` wurde im Rahmen eines F+E-Vorhabens die Einsetzbarkeit von Kuenstliche-Intelligenz-Methoden (KI) in der Betriebsueberwachung geprueft. Der Beitrag stellt Konzeption, Entwicklung und Bewertung von Loesungsansaetzen fuer die genannten Aufgabenstellungen vor. Als Grundlage fuer das Vorhaben wurden anhand KI-Methoden (speziell: Kuenstliche Neuronale Netze -KNN) auf der Grundlage gewonnener und aufbereiteter Wetterdaten die Beziehungen zwischen den Wettermessstellen im Laufe des Wetterwegs klassifiziert. (orig.)

  4. PHYSIOLOGICAL MONITORING OPERATORS ACS IN AUDIO-VISUAL SIMULATION OF AN EMERGENCY

    Directory of Open Access Journals (Sweden)

    S. S. Aleksanin

    2010-01-01

    Full Text Available In terms of ship simulator automated control systems we have investigated the information content of physiological monitoring cardiac rhythm to assess the reliability and noise immunity of operators of various specializations with audio-visual simulation of an emergency. In parallel, studied the effectiveness of protection against the adverse effects of electromagnetic fields. Monitoring of cardiac rhythm in a virtual crash it is possible to differentiate the degree of voltage regulation systems of body functions of operators on specialization and note the positive effect of the use of means of protection from exposure of electromagnetic fields.

  5. An autonomic security monitor for distributed operating systems

    OpenAIRE

    Arenas, A.; Aziz, Benjamin; Maj, S.; Matthews, B.

    2011-01-01

    This paper presents an autonomic system for the monitoring of security-relevant information in a Grid-based operating system. The system implements rule-based policies using Java Drools. Policies are capable of controlling the system environment based on changes in levels of CPU/memory usage, accesses to system resources, detection of abnormal behaviour such as DDos attacks.

  6. Main Results of Updated Decommission Conception of NPPs Operating in Ukraine

    International Nuclear Information System (INIS)

    Purtov, Oleg; Masko, Alexander; Vasilchenko, Victor

    2014-01-01

    Results of long-term planning analysis based on consideration of 6 possible scenarios for the nuclear energy development with 15 years and 20 years life time extensions of operation of nuclear power units beyond 30 year provided by original design are presented in the updated decommission conception of NPP's operating in Ukraine. These characteristics of the two main options for NPP decommissioning deferred or immediate dismantling, which is close to the level of acceptability with relative superiority variant of deferred dismantling, are presented. The best option for NPP unit decommissioning as comparative analysis results is the option with deferred dismantling with 30 years endurance time. It can be taken as a basis for optimal strategies for NPP unit decommission design development. Cost estimations for the decommissioning of WWER-440 and WWER-1000 reactor type units are presented in the updated conception. The updated cost assessment for required annual payments with uniform accumulation costs to the Decommission Fund corresponding deferred dismantling variant with 20 years life time extension operation time is 98,2 mln US$ per year. This value is 3.61% of the electricity generated by NPP's in Ukraine and supplied to the wholesale electricity market of Ukraine in 2012 base year. (authors)

  7. MONDO Project: real time ocean monitoring through Lagrangian drifters during offshore drilling operations

    Energy Technology Data Exchange (ETDEWEB)

    Mafra, Tatiana [Eni Oil do Brasil, Rio de Janeiro, RJ (Brazil); Fragoso, Mauricio da Rocha; Santos, Francisco Alves dos; Cruz, Leonardo M. Marques A.; Pellegrini, Julio A.C.; Cerrone, Bruna Nogueira [Prooceano, Rio de Janeiro, RJ (Brazil); Assireu, Arcilan Trevenzoli [Instituto Nacional de Pesquisas Espaciais (INPE), Sao Jose dos Campos, SP (Brazil)

    2008-07-01

    Monitoring the ocean conditions during offshore operations is essential for both operational and environmental aspects. Environmentally, not only to know better the environment where the activity is taking place, but also to be able to provide fast and accurate response in case of accidents. MONDO Project (Monitoring by Ocean Drifters) is a pioneer initiative from ENI Oil do Brasil and PROOCEANO that aimed to monitor currents as a part of a metoceanographic data monitoring project of drilling operations in Brazilian Waters, in Santos Basin throughout September to November 2007, 40 satellite tracked ocean drifters were deployed will be transmitting data up to November 2008. The results of this project can be used to study a wide range of subjects about ocean dynamics. Following the principles of social and environmental responsibility, MONDO Project aims to benefit the local ecosystem in increasing the scientific knowledge of the area to calibrate hydrodynamic models that will lead to more accurate modeling results and, as a consequence, to a better management of contingency plans. Based on these principles, the project will also provide unrestricted access to oceanographic data even after the end of operations. (author)

  8. The Westinghouse Hanford Company Operational Environmental Monitoring Program CY-93

    International Nuclear Information System (INIS)

    Schmidt, J.W.

    1993-10-01

    The Operational Environmental Monitoring Program (OEMP) provides facility-specific environmental monitoring to protect the environment adjacent to facilities under the responsibility of Westinghouse Hanford Company (WHC) and assure compliance with WHC requirements and local, state, and federal environmental regulations. The objectives of the OEMP are to evaluate: compliance with federal (DOE, EPA), state, and internal WHC environmental radiation protection requirements and guides; performance of radioactive waste confinement systems; and trends of radioactive materials in the environment at and adjacent to nuclear facilities and waste disposal sites. This paper identifies the monitoring responsibilities and current program status for each area of responsibility

  9. Simulation of the operational monitoring of a BWR with Simulate-3

    International Nuclear Information System (INIS)

    Jimenez F, J. O.; Martin del Campo M, C.; Fuentes M, L.; Francois L, J. L.

    2015-09-01

    This work was developed in order to describe the methodology for calculating the fuel burned of nuclear power reactors throughout the duration of their operating cycle and for each fuel reload. In other words, simulate and give monitoring to the main operation parameters of sequential way along its operation cycles. For this particular case, the operational monitoring of five consecutive cycles of a reactor was realized using the information reported by their processes computer. The simulation was performed with the Simulate-3 software and the results were compared with those of the process computer. The goal is to get the fuel burned, cycle after cycle for obtain the state conditions of the reactor needed for the fuel reload analyses, stability studies and transients analysis, and the development of a methodology that allows to manage and resolve similar cases for future fuel cycles of the nuclear power plant and explore the various options offered by the simulator. (Author)

  10. Gas House Autonomous System Monitoring

    Science.gov (United States)

    Miller, Luke; Edsall, Ashley

    2015-01-01

    Gas House Autonomous System Monitoring (GHASM) will employ Integrated System Health Monitoring (ISHM) of cryogenic fluids in the High Pressure Gas Facility at Stennis Space Center. The preliminary focus of development incorporates the passive monitoring and eventual commanding of the Nitrogen System. ISHM offers generic system awareness, adept at using concepts rather than specific error cases. As an enabler for autonomy, ISHM provides capabilities inclusive of anomaly detection, diagnosis, and abnormality prediction. Advancing ISHM and Autonomous Operation functional capabilities enhances quality of data, optimizes safety, improves cost effectiveness, and has direct benefits to a wide spectrum of aerospace applications.

  11. A technical system to improve the operational monitoring of the Zaporozhye nuclear power plant

    Energy Technology Data Exchange (ETDEWEB)

    Beyer, M; Carl, H; Nowak, K [Technischer Ueberwachungsverein Rheinland, Koeln (Germany). Inst. for Nuclear Engineering and Radiation Protection; Schumann, P; Seidel, A; Weiss, F P; Zschau, J

    1998-10-01

    As part of the programme implemented by the German Ministry of Environment, Nature Conservation and Reactor Safety to cooperate with the Central and Eastern European States (CEES) and the Commonwealth of Independent States (CIS) in the area of nuclear safety, a technical system to improve operational monitoring has been designed, specified and established since 1992 as a pilot project in the Zaporozhye/Ukraine nuclear power plant by Forschungszentrum Rossendorf and Technischer Ueberwachungsverein Rheinland with a significant contribution from the State Scientific and Technical Centre of the Ukrainian supervisory authority. The technical system complements existing operational checking and monitoring facilities by including modern means of information technology. It enables a continuous monitoring of the state of unit 5 in normal operation and in cases of anomalies or incidents so that when recognisable deviations from the regular plant operation occur, the Ukrainian supervisory authority can immediately inquire and if necessary impose conditions on the operator. The radiological and meteorological parameters at the nuclear power plant location are monitored to the extent necessary to assess the current radiation situation and to implement efficient emergency management measures. (orig.)

  12. A technical system to improve the operational monitoring of the Zaporozhye nuclear power plant

    International Nuclear Information System (INIS)

    Beyer, M.; Carl, H.; Nowak, K.; Schumann, P.; Seidel, A.; Weiss, F.P.; Zschau, J.

    1998-01-01

    As part of the programme implemented by the German Ministry of Environment, Nature Conservation and Reactor Safety to cooperate with the Central and Eastern European States (CEES) and the Commonwealth of Independent States (CIS) in the area of nuclear safety, a technical system to improve operational monitoring has been designed, specified and established since 1992 as a pilot project in the Zaporozhye/Ukraine nuclear power plant by Forschungszentrum Rossendorf and Technischer Ueberwachungsverein Rheinland with a significant contribution from the State Scientific and Technical Centre of the Ukrainian supervisory authority. The technical system complements existing operational checking and monitoring facilities by including modern means of information technology. It enables a continuous monitoring of the state of unit 5 in normal operation and in cases of anomalies or incidents so that when recognisable deviations from the regular plant operation occur, the Ukrainian supervisory authority can immediately inquire and if necessary impose conditions on the operator. The radiological and meteorological parameters at the nuclear power plant location are monitored to the extent necessary to assess the current radiation situation and to implement efficient emergency management measures. (orig.)

  13. Development of Operational Safety Monitoring System and Emergency Preparedness Advisory System for CANDU Reactors (I)

    International Nuclear Information System (INIS)

    Kim, Ma Woong; Shin, Hyeong Ki; Lee, Sang Kyu; Kim, Hyun Koon; Yoo, Kun Joong; Ryu, Yong Ho; Son, Han Seong; Song, Deok Yong

    2007-01-01

    As increase of operating nuclear power plants, an accident monitoring system is essential to ensure the operational safety of nuclear power plant. Thus, KINS has developed the Computerized Advisory System for a Radiological Emergency (CARE) system to monitor the operating status of nuclear power plant continuously. However, during the accidents or/and incidents some parameters could not be provided from the process computer of nuclear power plant to the CARE system due to limitation of To enhance the CARE system more effective for CANDU reactors, there is a need to provide complement the feature of the CARE in such a way to providing the operating parameters using to using safety analysis tool such as CANDU Integrated Safety Analysis System (CISAS) for CANDU reactors. In this study, to enhance the safety monitoring measurement two computerized systems such as a CANDU Operational Safety Monitoring System (COSMOS) and prototype of CANDU Emergency Preparedness Advisory System (CEPAS) are developed. This study introduces the two integrated safety monitoring system using the R and D products of the national mid- and long-term R and D such as CISAS and ISSAC code

  14. Sampling and Analysis Plan Update for Groundwater Monitoring 1100-EM-1 Operable Unit

    International Nuclear Information System (INIS)

    DR Newcomer

    1999-01-01

    This document updates the sampling and analysis plan (Department of Energy/Richland Operations--95-50) to reflect current groundwater monitoring at the 1100-EM-1Operable Unit. Items requiring updating included sampling and analysis protocol, quality assurance and quality control, groundwater level measurement procedure, and data management. The plan covers groundwater monitoring, as specified in the 1993 Record of Decision, during the 5-year review period from 1995 through 1999. Following the 5-year review period, groundwater-monitoring data will be reviewed by Environmental Protection Agency to evaluate the progress of natural attenuation of trichloroethylene. Monitored natural attenuation and institutional controls for groundwater use at the inactive Horn Rapids Landfill was the selected remedy specified in the Record of Decision

  15. Operation of the NuMI Beam Monitoring System

    International Nuclear Information System (INIS)

    Zwaska, Robert M.; Indurthy, Dharma; Keisler, Ryan; Kopp, Sacha; Mendoza, Steven; Pavlovich, Zarko; Proga, Marek; Bishai, Mary; Diwan, Milind; Viren, Brett; Harris, Debbie; Marchionni, Alberto; Morfin, Jorge; McDonald, Jeffrey; Naples, Donna; Northacker, David; Erwin, Albert; Ping, Huican; Velissaris, Cristos

    2006-01-01

    The NuMI (Neutrinos at the Main Injector) facility produces an intense neutrino beam for experiments. The NuMI Beam Monitoring system consists of four arrays of ion chambers that measure the intensity and distribution of the remnant hadron and tertiary muon beams produced in association with the neutrinos. The ion chambers operate in an environment of high particle fluxes and high radiation

  16. Feasibility Criteria for Interval Management Operations as Part of Arrival Management Operations

    Science.gov (United States)

    Levitt, Ian M.; Weitz, Lesley A.; Barmore, Bryan E.; Castle, Michael W.

    2014-01-01

    Interval Management (IM) is a future airborne spacing concept that aims to provide more precise inter-aircraft spacing to yield throughput improvements and greater use of fuel efficient trajectories for arrival and approach operations. To participate in an IM operation, an aircraft must be equipped with avionics that provide speeds to achieve and maintain an assigned spacing interval relative to another aircraft. It is not expected that all aircraft will be equipped with the necessary avionics, but rather that IM fits into a larger arrival management concept developed to support the broader mixed-equipage environment. Arrival management concepts are comprised of three parts: a ground-based sequencing and scheduling function to develop an overall arrival strategy, ground-based tools to support the management of aircraft to that schedule, and the IM tools necessary for the IM operation (i.e., ground-based set-up, initiation, and monitoring, and the flight-deck tools to conduct the IM operation). The Federal Aviation Administration is deploying a near-term ground-automation system to support metering operations in the National Airspace System, which falls within the first two components of the arrival management concept. This paper develops a methodology for determining the required delivery precision at controlled meter points for aircraft that are being managed to a schedule and aircraft being managed to a relative spacing interval in order to achieve desired flow rates and adequate separation at the meter points.

  17. Safety valve opening and closing operation monitor

    International Nuclear Information System (INIS)

    Kodama, Kunio; Takeshima, Ikuo; Takahashi, Kiyokazu.

    1981-01-01

    Purpose: To enable the detection of the closing of a safety valve when the internal pressure in a BWR type reactor is a value which will close the safety valve, by inputting signals from a pressure detecting device mounted directly at a reactor vessel and a safety valve discharge pressure detecting device to an AND logic circuit. Constitution: A safety valve monitor is formed of a pressure switch mounted at a reactor pressure vessel, a pressure switch mounted at the exhaust pipe of the escape safety valve and a logic circuit and the lide. When the input pressure of the safety valve is raised so that the valve and the pressure switch mounted at the exhaust pipe are operated, an alarm is indicated, and the operation of the pressure switch mounted at a pressure vessel is eliminated. If the safety valve is not reclosed when the vessel pressure is decreased lower than the pressure at which it is to be reclosed after the safety valve is operated, an alarm is generated by the logic circuit since both the pressure switches are operated. (Sekiya, K.)

  18. Connected vehicle pilot deployment program phase 1, concept of operations (ConOps) - New York City.

    Science.gov (United States)

    2016-04-08

    This document describes the Concept of Operations (ConOps) for the New York City Department of Transportation (NYC) Connected Vehicle Pilot Deployment (CVPD) Project. This ConOps describes the current state of operations, establishes the reasons for ...

  19. Accuracy of home blood pressure readings: monitors and operators.

    Science.gov (United States)

    Stryker, Trina; Wilson, Merne; Wilson, Thomas W

    2004-06-01

    To evaluate the accuracy of automated digital blood pressure monitoring devices and operators in the community. Also, we tested the effects of a simple education program, and looked for arm-arm differences. Subjects who had bought their own automated digital blood pressure monitor were recruited via an advertisement in the local newspaper. On arrival, they were asked to record their blood pressure exactly as they would at home. The investigator noted any technique deficiencies then corrected them. Blood pressures were then recorded by the investigator and the subject, on opposite arms, simultaneously, and repeated with the arms switched. Finally, subjects recorded their blood pressure again. The subjects' readings were compared to the average of monitor and mercury readings using Bland-Altman methods. A total of 80 subjects were tested. Before educating, subjects' systolic blood pressure (SBP) readings were +5.8+/-6.4 (standard deviation) mmHg greater than the mean of all readings, and diastolic blood pressure (DBP) were +1.3+/-4.0 mmHg; after educating they were +1.3+/-4.0 and -1.3+/-2.7 respectively. The monitors, as a group, were accurate, and met British Hypertension Society and AAMI highest standards. We found no differences among monitors that had been validated (n=26) and those that had not. There were differences between the arms: 5.3+/-5.2 mmHg for SBP and 3.4+/-3.3 mmHg for DBP. Most patients had never been informed by anyone of proper blood pressure measuring techniques. We conclude that home blood pressure measurement, as practiced in our community, is prone to error, mostly due to mistakes by the operator. These can easily be corrected, so that readings become more accurate. Attention should be paid to arm-arm differences.

  20. Automatic fatigue monitoring based on real loads. Live demonstration

    International Nuclear Information System (INIS)

    Bergholz, Steffen; Rudolph, Juergen; Bruckmueller, Florian; Heinz, Benedikt; Jouan, Benoit

    2012-01-01

    The fatigue assessment of power plant components based on local fatigue monitoring approaches is an essential part of the integrity concept and modern lifetime management. An integral approach like the AREVA Fatigue Concept (AFC) basically consists of two essential modules: realistic determination of occurring operational thermal loads by means of a high end fatigue monitoring system and related highly qualified fatigue assessment methods and tools. The fatigue monitoring system delivers continuously realistic load data at the fatigue relevant locations. Consequently, realistic operational load sequences are available as input data for all ensuing fatigue analyses. This way, realistic load data are available and qualified fatigue usage factors can be determined. The mode of operation of the fatigue monitoring system will be explained in the framework of a live demonstration by means of the FAMOSi (i = integrated) demonstration wall. The workflow starts with the continuous online measurement of outer wall temperatures transients on a pipe. Visualization is implemented within the FAMOSi viewer software. In a second step, inner wall temperatures are directly calculated. In a third step, the resulting linearly elastic stress history will be calculated as the basis for subsequent code conforming fatigue assessment. Subsequently, the related advanced fatigue assessment methods of the three staged AFC-approach are addressed.

  1. A national computerized system for monitoring operational radiation exposure

    International Nuclear Information System (INIS)

    Canipelle, A.D.

    1996-01-01

    In parallel to the expansion of the number of French nuclear power plant units in operation, maintenance actions have multiplied, which has meant calling upon the services of a growing number of increasingly specialized workers. It has therefore proved necessary to reinforce the radiation dose rate surveillance of these workers. As a result, certain companies decided to set up their own occupational radiation dose monitoring system, in addition to mandatory monitoring by the OPRI, using dosemeters, generally electronic or thermoluminescent film badges, supplied by the subcontractor companies or nuclear facility operators. This enables acquiring fast and accurate knowledge of the radiation doses received by the workers. For this type of surveillance to be fully efficient, a data centralization system was required, able to provide frequent, even daily readings if necessary, of the dose received during the current month or for any period of time, up to the sum of the doses accumulated over five years. (author)

  2. Concept of operator support system based on cognitive simulation

    International Nuclear Information System (INIS)

    Sasou, Kunihide; Takano, Kenichi

    1999-01-01

    Hazardous technologies such chemical plants, nuclear power plants, etc. have introduced multi-layered defenses to prevent accidents. One of those defenses is experienced operators in control rooms. Once an abnormal condition occurs, they are the front line people to cope with it. Therefore, operators' quick recognition of the plant conditions and fast decision making on responses are quite important for trouble shooting. In order to help operators to deal with abnormalities in process plants, lots of efforts had been done to develop operator support systems since early 1980s (IAEA, 1993). However, the boom in developing operator support systems has slumped due to the limitations of knowledge engineering, artificial knowledge, etc (Yamamoto, 1998). The limitations had also biased the focus of the system development to abnormality detection, root cause diagnosis, etc (Hajek, Hashemi, Sharma and Chandrasekaran, 1986). Information or guidance about future plant behavior and strategies/tactics to deal with abnormal events are important and helpful for operators but researches and development of those systems made a belated start. Before developing these kinds of system, it is essential to understand how operators deal with abnormalities. CRIEPI has been conducting a project to develop a computer system that simulates behavior of operators dealing with abnormal operating conditions in a nuclear power plant. This project had two stages. In the first stage, the authors developed a prototype system that simulates behavior of a team facing abnormal events in a very simplified power plant (Sasou, Takano and Yoshimura, 1995). In the second stage, the authors applied the simulation technique developed in the first stage to construct a system to simulate a team's behavior in a nuclear power plant. This paper briefly summarizes the simulation system developed in the second stage, main mechanism for the simulation and the concept of an operator support system based on this

  3. New Concepts and methods for developing shop floor control systems

    DEFF Research Database (Denmark)

    Lynggaard, Hans Jørgen; Bilberg, Arne; Alting, Leo

    1998-01-01

    concept reduces the effort for providing and operating high quality and high functionality cell control solutions for the industry. The plans for the next generation industrial shop floor and cell controllers are to develop new concepts based on more distributed systems, which are more robust and agile...... with respect to changing demands, technological advances and daily operations. The scope of these systems are a network of co-operating cells as opposed to individually operated cells which are co-ordinated in a traditionally (hierarchical planning) manner. This new approach raises new demands......An industrial research project defines models and methods for design and implementation of computer based control and monitoring systems for production cells. This is primarily documented within automated robot welding cells in the shipbuilding industry. In order to support engineering of cell...

  4. The Science Operations Concept for the ExoMars 2016 Trace Gas Orbiter

    Science.gov (United States)

    Frew, D.

    2014-04-01

    The ExoMars 2016 Science Operations Centre (SOC) based at the European Space Astronomy Centre is responsible for coordinating the science planning activities for the Trace Gas Orbiter. Science planning will involve all members of the ExoMars 2016 science ground segment (SGS), namely the SOC at ESAC, the Russian SOC at IKI, the orbiter instrument teams and the science management of the 2016 mission represented by the science working team (SWT) that is chaired by the project scientist. The science operations concept for the mission builds on the legacy inherited from previous ESA planetary missions, in particular from Mars Express for the core plan validation aspects and from the Smart-1 lunar mission for the opportunity analysis and longterm planning approach. Further concept drivers have been derived from the ExoMars 2016 mission profile in the areas of orbit predictability, instrument design and the usage of TGO as a relay for surface assets including the ExoMars 2018 rover. This paper will give an over view of the entire uplink planning process as it is conducted over 3 distinct planning cycles. The Long Term Plan (LTP) establishes the baseline science plan and demonstrates the operational feasibility of meeting the mission science goals formulated by the science working team (SWT) at science management level. The LTP has a planning horizon of 6 months. Each month of the baseline science plan is refined with the instrument teams within the Medium Term Plan (MTP) to converge on a frozen attitude request and resource envelopes for all of the observations in the plan. During the Short Term Planning cycle the SOC will iterate with the teams to finalise the commanding for all of the observations in the plan for the coming week. The description of the uplink planning process will focus on two key areas that are common to all of the planning cycles mentioned above: • Science Plan Abstraction: Interacting with the science plan at the appropriate level of abstraction to

  5. High Level Waste plant operation and maintenance concepts. Final report, March 27, 1995

    International Nuclear Information System (INIS)

    Janicek, G.P.

    1995-01-01

    The study reviews and evaluates worldwide High Level Waste (HLW) vitrification operating and maintenance (O ampersand M) philosophies, plant design concepts, and lessons learned with an aim towards developing O ampersand M recommendations for either, similar implementation or further consideration in a HLW vitrification facility at Hanford. The study includes a qualitative assessment of alternative concepts for a variety of plant and process systems and subsystems germane to HLW vitrification, such as, feed materials handling, melter configuration, glass form, canister handling, failed equipment handling, waste handling, and process control. Concept evaluations and recommendations consider impacts to Capital Cost, O ampersand M Cost, ALARA, Availability, and Reliability

  6. Pre operational background radiation monitoring around Kudankulam Nuclear Power Project site - a decade long experience

    International Nuclear Information System (INIS)

    Vijayakumar, B.; George, Thomas; Sundara Rajan, P.; Selvi, B.S.; Balamurugan, M.; Pandit, G.G.; Ravi, P.M.; Tripathi, R.M.

    2014-01-01

    Pre-operational environmental background radiation monitoring around nuclear power plants is very important to understand baseline values existing in the site and also to identify any hot spots of naturally occurring high background radiation areas and their sources. These baseline measurements will act as a benchmark for future comparison after the reactors go into operation. The radiation measurements are continued during the operational phase of the plant and the results are compared to see whether there is any impact of the operation of the plant on the environment. A comprehensive background radiation monitoring plan has been in vogue at site from 2004 to meet this objective. This paper describes the different monitoring strategies adopted around Kudankulam Nuclear Power Project site and throws light on the pre operational background radiation levels in the environment

  7. Systems engineering approach towards performance monitoring of emergency diesel generator

    International Nuclear Information System (INIS)

    Nurhayati Ramli; Lee, Y.K.

    2013-01-01

    Full-text: Systems engineering is an interdisciplinary approach and means to enable the realization of successful systems. In this study, systems engineering approach towards the performance monitoring of Emergency Diesel Generator (EDG) is presented. Performance monitoring is part and parcel of predictive maintenance where the systems and components conditions can be detected before they result into failures. In an effort to identify the proposal for addressing performance monitoring, the EDG boundary has been defined. Based on the Probabilistic Safety Analysis (PSA) results and industry operating experiences, the most critical component is identified. This paper proposed a systems engineering concept development framework towards EDG performance monitoring. The expected output of this study is that the EDG reliability can be improved by the performance monitoring alternatives through the systems engineering concept development effort. (author)

  8. Operational monitoring of turbidity in rivers: how satellites can contribute

    Science.gov (United States)

    Hucke, Dorothee; Hillebrand, Gudrun; Winterscheid, Axel; Kranz, Susanne; Baschek, Björn

    2016-10-01

    The applications of remote sensing in hydrology are diverse and offer significant benefits for water monitoring. Up to now, operational river monitoring and sediment management in Germany mainly rely on in-situ measurements and on results obtained from numerical modelling. Remote sensing by satellites has a great potential to supplement existing data with two-dimensional information on near-surface turbidity distributions at greater spatial scales than in-situ measurements can offer. Within the project WasMon-CT (WaterMonitoring-Chlorophyll/Turbidity), the Federal Institute of Hydrology (BfG) aims at the implementation of an operational monitoring of turbidity distributions based on satellite images (esp. Sentinel-2, Landsat7 and 8). Initially, selected federal inland and estuarine waterways will be addressed: Rhine, Elbe, Ems, Weser. WasMon-CT is funded within the German Copernicus activities. Within the project, a database of atmospherically corrected, geo-referenced turbidity data will be assembled. The collected corresponding meta-data will include aspects of satellite data as well as hydrological data, e.g. cloud cover and river run-off. Based on this catalogue of spatially linked meta-data, the satellite data will be selected by e.g. cloud cover or run-off. The permanently updated database will include past as well as recent satellite images. It is designed with a long-term perspective to optimize the existing in-situ measurement network, which will serve partly for calibration and partly as validation data set. The aim is to extend, but not to substitute, the existing frequent point measurements with spatially extensive, satellite-derived data from the near surface part of the water column. Here, turbidity is used as proxy for corresponding suspended sediment concentrations. For this, the relationship between turbidity and suspended sediment concentrations will be investigated. Products as e.g. longitudinal profiles or virtual measurement stations will be

  9. Environmental Monitoring Plan United States Department of Energy Richland Operations Office. Revision 2

    International Nuclear Information System (INIS)

    1997-01-01

    This Environmental Monitoring Plan was prepared for the US Department of Energy's (DOE's) Richland Operations Office (RL) to implement the requirements of DOE Order 5400.1. According to the Order, each DOE site, facility, or activity that uses, generates, releases, or manages significant pollutants or hazardous materials shall prepare a written environmental monitoring plan covering two major activities: (1) effluent monitoring and (2) environmental surveillance. The plan is to contain information discussing the rationale and design criteria for the monitoring programs, sampling locations and schedules, quality assurance requirements, program implementation procedures, analytical procedures, and reporting requirements. The plan's purpose is to assist DOE in the management of environmental activities at the Hanford Site and to help ensure that operations on the site are conducted in an environmentally safe and sound manner

  10. Environmental Monitoring Plan United States Department of Energy Richland Operations Office. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-11-10

    This Environmental Monitoring Plan was prepared for the US Department of Energy`s (DOE`s) Richland Operations Office (RL) to implement the requirements of DOE Order 5400.1. According to the Order, each DOE site, facility, or activity that uses, generates, releases, or manages significant pollutants or hazardous materials shall prepare a written environmental monitoring plan covering two major activities: (1) effluent monitoring and (2) environmental surveillance. The plan is to contain information discussing the rationale and design criteria for the monitoring programs, sampling locations and schedules, quality assurance requirements, program implementation procedures, analytical procedures, and reporting requirements. The plan`s purpose is to assist DOE in the management of environmental activities at the Hanford Site and to help ensure that operations on the site are conducted in an environmentally safe and sound manner.

  11. A Practical Review of Studies on Operator's Supervisory Monitoring Behavior

    International Nuclear Information System (INIS)

    Ha, Jun Su; Seong, Poong Hyun

    2009-01-01

    Correct situation awareness (SA) has been considered a crucial key to improving performance and reducing error in NPPs. There are a lot of information sources that should be monitored in NPPs, but operators have only limited capacity of attention and memory. Operators in NPPs selectively attend to important information sources to effectively develop SA when an abnormal or accidental situation occurs. Selective attention to important information sources is continued while maintaining SA as well. In this work, various models of operator's visual sampling behavior are reviewed for the use in human factors studies in NPPs

  12. Mobile Surveillance and Monitoring Robots

    International Nuclear Information System (INIS)

    Kimberly, Howard R.; Shipers, Larry R.

    1999-01-01

    Long-term nuclear material storage will require in-vault data verification, sensor testing, error and alarm response, inventory, and maintenance operations. System concept development efforts for a comprehensive nuclear material management system have identified the use of a small flexible mobile automation platform to perform these surveillance and maintenance operations. In order to have near-term wide-range application in the Complex, a mobile surveillance system must be small, flexible, and adaptable enough to allow retrofit into existing special nuclear material facilities. The objective of the Mobile Surveillance and Monitoring Robot project is to satisfy these needs by development of a human scale mobile robot to monitor the state of health, physical security and safety of items in storage and process; recognize and respond to alarms, threats, and off-normal operating conditions; and perform material handling and maintenance operations. The system will integrate a tool kit of onboard sensors and monitors, maintenance equipment and capability, and SNL developed non-lethal threat response technology with the intelligence to identify threats and develop and implement first response strategies for abnormal signals and alarm conditions. System versatility will be enhanced by incorporating a robot arm, vision and force sensing, robust obstacle avoidance, and appropriate monitoring and sensing equipment

  13. 40 CFR 60.1730 - How do I make sure my continuous emission monitoring systems are operating correctly?

    Science.gov (United States)

    2010-07-01

    ... emission monitoring systems are operating correctly? 60.1730 Section 60.1730 Protection of Environment... continuous emission monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous emission monitoring systems that measure oxygen (or carbon dioxide...

  14. 40 CFR 60.3039 - How do I make sure my continuous emission monitoring systems are operating correctly?

    Science.gov (United States)

    2010-07-01

    ... emission monitoring systems are operating correctly? 60.3039 Section 60.3039 Protection of Environment... emission monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous emission monitoring systems that measure carbon monoxide and oxygen. (b...

  15. A technical system to improve the operational monitoring of the Zaporozh'ye nuclear power plant

    International Nuclear Information System (INIS)

    Beyer, M.; Carl, H.; Schumann, P.; Seidel, A.; Weiss, F.-P.; Zschau, J.; Nowak, K.

    1997-01-01

    As part of a programme of cooperation with Central and Eastern European states, a technical system has been established for the Zaporozhe nuclear power plant, which complements existing operational checking and monitoring facilities with modern means of information technology. It makes it possible to continuously monitor the state of the units in normal operation and in cases of anomalies or incidents. The parameters selected for monitoring are listed, and the system of automatic evaluation at the power plant site is described in detail. Test operation of the technical system started in late 1995 and the industrial testing phase in mid-1996. (A.K.)

  16. Human Factors Analysis of Pipeline Monitoring and Control Operations: Final Technical Report

    Science.gov (United States)

    2008-11-26

    The purpose of the Human Factors Analysis of Pipeline Monitoring and Control Operations project was to develop procedures that could be used by liquid pipeline operators to assess and manage the human factors risks in their control rooms that may adv...

  17. 40 CFR 60.663 - Monitoring of emissions and operations.

    Science.gov (United States)

    2010-07-01

    ... 44 MW (150 million Btu/hr) heat input design capacity. (d) Monitor and record the periods of operation of the boiler or process heater if the design heat input capacity of the boiler or process heater... thermal conductivity, each equipped with a continuous recorder. (2) Where a condenser is the final...

  18. Web application for monitoring mainframe computer, Linux operating systems and application servers

    OpenAIRE

    Dimnik, Tomaž

    2016-01-01

    This work presents the idea and the realization of web application for monitoring the operation of the mainframe computer, servers with Linux operating system and application servers. Web application is intended for administrators of these systems, as an aid to better understand the current state, load and operation of the individual components of the server systems.

  19. Conceptual Blending Monitoring Students' Use of Metaphorical Concepts to Further the Learning of Science

    Science.gov (United States)

    Fredriksson, Alexandra; Pelger, Susanne

    2018-03-01

    The aim of this study is to explore how tertiary science students' use of metaphors in their popular science article writing may influence their understanding of subject matter. For this purpose, six popular articles written by students in physics or geology were analysed by means of a close textual analysis and a metaphor analysis. In addition, semi-structured interviews were conducted with the students. The articles showed variation regarding the occurrence of active (non-conventional) metaphors, and metaphorical concepts, i.e. metaphors relating to a common theme. In addition, the interviews indicated that students using active metaphors and metaphorical concepts reflected more actively upon their use of metaphors. These students also discussed the possible relationship between subject understanding and creation of metaphors in terms of conceptual blending. The study suggests that students' process of creating metaphorical concepts could be described and visualised through integrated networks of conceptual blending. Altogether, the study argues for using conceptual blending as a tool for monitoring and encouraging the use of adequate metaphorical concepts, thereby facilitating students' opportunities of understanding and influencing the learning of science.

  20. 40 CFR 60.2940 - How do I make sure my continuous emission monitoring systems are operating correctly?

    Science.gov (United States)

    2010-07-01

    ... emission monitoring systems are operating correctly? 60.2940 Section 60.2940 Protection of Environment... monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous emission monitoring systems that measure carbon monoxide and oxygen. (b) Complete your...

  1. 40 CFR 62.15185 - How do I make sure my continuous emission monitoring systems are operating correctly?

    Science.gov (United States)

    2010-07-01

    ... emission monitoring systems are operating correctly? 62.15185 Section 62.15185 Protection of Environment... make sure my continuous emission monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous emission monitoring systems that measure oxygen (or...

  2. Indicators for monitoring of safety operation and condition of nuclear power stations

    International Nuclear Information System (INIS)

    Manova, D.

    2001-01-01

    A common goal of all employees in the nuclear power field is safety operation of nuclear power stations. The evaluation and control of NPP safety operation are a part of the elements of safety management. The present report is related only to a part of the total assessment and control of the plant safety operation, namely - the indicator system for monitoring of Kozloduy NPP operation and condition. (author)

  3. Radiation monitoring data on the power-up test of HTTR. Results up to 20 MW operation

    International Nuclear Information System (INIS)

    Ashikagaya, Yoshinobu; Nakazawa, Takashi; Yoshino, Toshiaki; Yasu, Katsuji

    2002-01-01

    The High Temperature Engineering Test Reactor (HTTR) have completed the Power-up test of 9 MW (the single and parallel loaded operation) in the rated operation mode. After that the Power-up test in the rated operation mode and the high-temperature test operation mode with a thermal output of 20 MW (the single and parallel loaded operation) were performed between January 16, 2001 and June 10, 2001. This report describes the radiation monitoring data carried out during the HTTR Power-up test in the rated operation mode and the high-temperature test operation mode with a thermal output of 20 MW. The followings were concluded from these radiation monitoring data. The monitoring of radioactive gaseous effluents and the radiation protection for the works will be easy to do and the exposure dose of the workers will be kept the low level. (author)

  4. Personnel planning and employment: Organizational concepts for safer power plant operation

    International Nuclear Information System (INIS)

    Mueller, K.H.

    1984-01-01

    Well thought out plant-specific organisation, proper staff selection, careful training, far-sighted management and an optimum man-machine relationship; this together guarantees problem-free operation of nuclear power plants. Organizational concepts must not be considered as statistical values. The management must maintain the capacity of re-thinking and, if necessary, leaving the beaten track of organizational routines. (orig./HSCH) [de

  5. Using the PAW/PEM monitoring systems to support operations at Point Lepreau

    International Nuclear Information System (INIS)

    MacDonald, S.; McIntyre, M.; Dai, H.

    1997-01-01

    The plant data logger was brought on-line at the Point Lepreau Generating Station (PLGS) in 1992 in order to record information from instruments throughout the plant. Using the System Engineers Data Extraction (SEDE) utility, current plant data is at the fingertips of anyone with a network connection. System engineers can monitor the performance of their systems at any time and take pro-active measures to avoid problems with performance, as well as monitor behaviour during tests and plant upsets. Nuclear Safety personnel gather data for use in simulation and analysis validation, as well as to ensure that plant parameters are kept within the safe operating envelope. The PLGS operational safety group embarked on a project to develop a data management system. The project and the monitoring process has come to be known as the Plant Analysis Workbench (PAW). When the need for complex monitoring of safety system signals was identified, this led to a similar project called the Plant Expert Monitor (PEM). In this paper we present an overview of the functionality of both PAW and PEM, outlining in particular the expert system architecture in PEM and giving an example of its day-to-day use

  6. 40 CFR 60.1240 - How do I make sure my continuous emission monitoring systems are operating correctly?

    Science.gov (United States)

    2010-07-01

    ... emission monitoring systems are operating correctly? 60.1240 Section 60.1240 Protection of Environment... Continuous Emission Monitoring § 60.1240 How do I make sure my continuous emission monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous...

  7. Exploring Concepts of Operations for On-Demand Passenger Air Transportation

    Science.gov (United States)

    Nneji, Victoria Chibuogu; Stimpson, Alexander; Cummings, Mary; Goodrich, Kenneth H.

    2017-01-01

    In recent years, a surge of interest in "flying cars" for city commutes has led to rapid development of new technologies to help make them and similar on-demand mobility platforms a reality. To this end, this paper provides analyses of the stakeholders involved, their proposed operational concepts, and the hazards and regulations that must be addressed. Three system architectures emerged from the analyses, ranging from conventional air taxi to revolutionary fully autonomous aircraft operations, each with vehicle safety functions allocated differently between humans and machines. Advancements for enabling technologies such as distributed electric propulsion and artificial intelligence have had major investments and initial experimental success, but may be some years away from being deployed for on-demand passenger air transportation at scale.

  8. Study on operational safety issues in the Japanese disposal concept

    International Nuclear Information System (INIS)

    Suzuki, Satoru; Kitagawa, Yoshito; Hyodo, Hideaki; Kubota, Shigeru; Iijima, Masayoshi; Tamura, Akio; Ishiguro, Katsuhiko; Fujihara, Hiroshi

    2014-01-01

    In Japan, vitrified high-level radioactive waste (HLW) and certain types of low-level radioactive waste that results from the reprocessing of spent fuel and classified as TRU waste will be disposed of in deep geological formations. NUMO aims to ensure the safety of local residents and workers during the operational phase and after repository closure and will therefore establish a safety case for the geological disposal programme at the end of each stage of the stepwise siting process. Although the Japanese programme is still in the stage before initiation of the siting process, updating the generic (non-site-specific) safety case is required for building confidence among stakeholders. This study focuses on operational safety issues for the Japanese HLW disposal concept. (authors)

  9. Operative contractility: a functional concept of the inotropic state.

    Science.gov (United States)

    Curiel, Roberto; Perez-Gonzalez, Juan; Torres, Edwar; Landaeta, Ruben; Cerrolaza, Miguel

    2005-10-01

    1. Initial unsuccessful attempts to evaluate ventricular function in terms of the 'heart as a pump' led to focusing on the 'heart as a muscle' and to the concept of myocardial contractility. However, no clinically ideal index exists to assess the contractile state. The aim of the present study was to develop a mathematical model to assess cardiac contractility. 2. A tri-axial system was conceived for preload (PL), afterload (AL) and contractility, where stroke volume (SV) was represented as the volume of the tetrahedron. Based on this model, 'operative' contractility ('OperCon') was calculated from the readily measured values of PL, AL and SV. The model was tested retrospectively under a variety of different experimental and clinical conditions, in 71 studies in humans and 29 studies in dogs. A prospective echocardiographic study was performed in 143 consecutive subjects to evaluate the ability of the model to assess contractility when SV and PL were measured volumetrically (mL) or dimensionally (cm). 3. With inotropic interventions, OperCon changes were comparable to those of ejection fraction (EF), velocity of shortening (Vcf) and dP/dt-max. Only with positive inotropic interventions did elastance (Ees) show significantly larger changes. With load manipulations, OperCon showed significantly smaller changes than EF and Ees and comparable changes to Vcf and dP/dt-max. Values of OperCon were similar when AL was represented by systolic blood pressure or wall stress and when volumetric or dimensional values were used. 4. Operative contractility is a reliable, simple and versatile method to assess cardiac contractility.

  10. Definition and Evaluation of Bus and Truck Automation Operations Concepts

    OpenAIRE

    Tsao, H.-S. Jacob; Botha, Jan L.

    2002-01-01

    Traffic congestion will continue to worsen and likely worsen at a faster rate than ever. People throughput and freight throughput have become critical issues for California and the rest of the nation. PATH has been funding a one-year research project entitled "Definition and Evaluation of Bus and Truck Automation Operations Concepts," proposed by the authors. This report summarizes the results of the research project achieved during the first six months. During those six months, we reviewed l...

  11. A computational model for knowledge-driven monitoring of nuclear power plant operators based on information theory

    International Nuclear Information System (INIS)

    Kim, Man Cheol; Seong, Poong Hyun

    2006-01-01

    To develop operator behavior models such as IDAC, quantitative models for the cognitive activities of nuclear power plant (NPP) operators in abnormal situations are essential. Among them, only few quantitative models for the monitoring and detection have been developed. In this paper, we propose a computational model for the knowledge-driven monitoring, which is also known as model-driven monitoring, of NPP operators in abnormal situations, based on the information theory. The basic assumption of the proposed model is that the probability that an operator shifts his or her attention to an information source is proportional to the expected information from the information source. A small experiment performed to evaluate the feasibility of the proposed model shows that the predictions made by the proposed model have high correlations with the experimental results. Even though it has been argued that heuristics might play an important role on human reasoning, we believe that the proposed model can provide part of the mathematical basis for developing quantitative models for knowledge-driven monitoring of NPP operators when NPP operators are assumed to behave very logically

  12. Proceedings of recent innovations and experience with plant monitoring and utility operations

    International Nuclear Information System (INIS)

    Fruchtman, I.

    1991-01-01

    This book contains proceedings of Recent Innovations and Experience with Plant Monitoring and Utility Operations. Topics covered include: a number of innovative actions recently applied at plants in the United States, Australia, and the People's Republic of China. A preview of forthcoming instrumentation and monitoring techniques, enhanced boiler and turbine operations and maintenance, determining root causes of boiler related problems, welding technique that eliminates high temperature, post weld heat treatment, successful application of a portable oil filtration skid, and a method of evaluation for high pressure turbine life assessment using the EPRI rotor life assessment software

  13. Continuous containment monitoring with containment pressure fluctuation

    International Nuclear Information System (INIS)

    Dick, J.E.

    1996-01-01

    The monitoring of the integrity of containments particularly but not exclusively for nuclear plants is dealt with in this invention. While this application is primarily concerned with containment monitoring in the context of the single unit design, it is expected that the concepts presented will be universally applicable to any containment design, including containments for non-nuclear applications such as biological laboratories. The nuclear industry has long been interested in a means of monitoring containment integrity on a continuous basis, that is, while the reactor is operating normally. 12 refs., 2 figs

  14. Feasibility and usability of a home monitoring concept based on mobile phones and near field communication (NFC) technology.

    Science.gov (United States)

    Morak, Jürgen; Kollmann, Alexander; Schreier, Günter

    2007-01-01

    Utilization of mobile information and communication technologies in home monitoring applications is becoming more and more common. The mobile phone, acting as a patient terminal for patients suffering from chronic diseases, provides an active link to the caregiver to transmit health status information and receive feedback. In such a concept the usability is still limited by the necessity of entering the values via the mobile phone's small keypad. The near field communication technology (NFC), a touch-based wireless interface that became available recently, may improve the usability level of such applications significantly. The focus of this paper is to describe the development of a prototype application based on this technology embedded in a home monitoring system. The feasibility and usability of this approach are evaluated and compared with concepts used in previous approaches. The high quantifier with respect to overall usability indicates that NFC may be the technology of choice for some tasks in home monitoring applications.

  15. Process monitoring for reprocessing plant safeguards: a summary review

    International Nuclear Information System (INIS)

    Kerr, H.T.; Ehinger, M.H.; Wachter, J.W.; Hebble, T.L.

    1986-10-01

    Process monitoring is a term typically associated with a detailed look at plant operating data to determine plant status. Process monitoring has been generally associated with operational control of plant processes. Recently, process monitoring has been given new attention for a possible role in international safeguards. International Safeguards Project Office (ISPO) Task C.59 has the goal to identify specific roles for process monitoring in international safeguards. As the preliminary effort associated with this task, a review of previous efforts in process monitoring for safeguards was conducted. Previous efforts mentioned concepts and a few specific applications. None were comprehensive in addressing all aspects of a process monitoring application for safeguards. This report summarizes the basic elements that must be developed in a comprehensive process monitoring application for safeguards. It then summarizes the significant efforts that have been documented in the literature with respect to the basic elements that were addressed

  16. General concept of a gas engine for a hybrid vehicle, operating on methanol dissociation products

    International Nuclear Information System (INIS)

    Tartakovsky, L.; Aleinikov, Y.; Fainberg, V.; Garbar, A.; Gutman, M.; Hetsroni, G.; Schindler, Y.; Zvirin, Y.

    1998-01-01

    The paper presents a general concept of a hybrid propulsion system, based on an SI internal combustion engine fueled by methanol dissociation products (MDP). The proposed hybrid propulsion scheme is a series hybrid, which allows the engine to be operated in an on-off mode at constant optimal regime. The engine is fed by gaseous products of methanol dissociation (mainly hydrogen and carbon monoxide) emerging from an on-board catalytic reformer. The general scheme and base operation features of the propulsion system are described. The benefits that may be achieved by combining the well-known idea of on-board methanol dissociation with the hybrid vehicle concept are discussed. The proposed scheme is compared with those of systems operating on gasoline, liquid methanol, hydrogen and also with the multi-regime (not hybrid) engine fed by MDP

  17. Individual monitoring with official electronic dosemeters in Germany - concepts and reality

    International Nuclear Information System (INIS)

    Martini, E.; Wahl, W.; Huebner, S.; Freynhagen, D.; Staemmler, M.

    2005-01-01

    Full text: Active (electronic) personal dosemeters (APD) are radiometers, which are equipped as active or passive dosimeters. They can directly indicate a dose rate and/or the dose integrated during a certain period (direct-indicating, active electronic personal dosemeters mentioned) or only over a separate reader (direct-selectable, passive electronic personal dosemeters mentioned). A concept is presented for the use of passive or active electronic personal dosemeters in Germany as official dosemeters, e.g. in hospitals. The concept features a net-based approach for secure data communication between readers for passive and active electronic personal dosemeters und the official personal dosimetry monitoring service(s), taking the German policies (StrISchV und RoeV in hospitals) into account. The net-based solution includes a processor controlled interface via TCP/IP connected to the dosimetry reader(s), und reader interfaces, an official interim data bank and all the necessary equipment such as PC, Raid-configuration, USV support, network connection and further details. Investigations have been started to achieve highest-level data manipulation security, data completeness und data correctness. (author)

  18. Comprehensive Test Ban Treaty (CTBT) monitoring station operating regime influence on radionuclide detection sensitivity

    International Nuclear Information System (INIS)

    Williams, D.L.

    1999-01-01

    International Monitoring System (IMS) stations are being deployed worldwide in support of the Comprehensive [Nuclear] Test Ban Treaty (CTBT). The highly sensitive radionuclide monitoring stations regularly sample airborne radionuclide particulates to determine whether fission products are present in the atmosphere that may be indicative of a nuclear weapons test. Standards have been set for these stations regarding their operation regime and the minimum detectable concentrations (MDCs) for specific radionuclides likely to be present after a nuclear weapons test. This study uses actual CTBT monitoring data to relate a subset of the specified operational standards with the listed MDC limits. It is determined that a relationship exists between the specified operational regime and the MDC values. Since the background radioactivity is largely a function of the radon and thoron progeny, longer decay operational regimes allow for a reduction in the background. For longer lived radionuclides, this corresponds to a reduction in MDC. (author)

  19. Method and apparatus for monitoring plasma processing operations

    Science.gov (United States)

    Smith, Jr., Michael Lane; Ward, Pamela Denise Peardon; Stevenson, Joel O'Don

    2002-01-01

    The invention generally relates to various aspects of a plasma process, and more specifically the monitoring of such plasma processes. One aspect relates in at least some manner to calibrating or initializing a plasma monitoring assembly. This type of calibration may be used to address wavelength shifts, intensity shifts, or both associated with optical emissions data obtained on a plasma process. A calibration light may be directed at a window through which optical emissions data is being obtained to determine the effect, if any, that the inner surface of the window is having on the optical emissions data being obtained therethrough, the operation of the optical emissions data gathering device, or both. Another aspect relates in at least some manner to various types of evaluations which may be undertaken of a plasma process which was run, and more typically one which is currently being run, within the processing chamber. Plasma health evaluations and process identification through optical emissions analysis are included in this aspect. Yet another aspect associated with the present invention relates in at least some manner to the endpoint of a plasma process (e.g., plasma recipe, plasma clean, conditioning wafer operation) or discrete/discernible portion thereof (e.g., a plasma step of a multiple step plasma recipe). Another aspect associated with the present invention relates to how one or more of the above-noted aspects may be implemented into a semiconductor fabrication facility, such as the distribution of wafers to a wafer production system. A final aspect of the present invention relates to a network a plurality of plasma monitoring systems, including with remote capabilities (i.e., outside of the clean room).

  20. Concept of an advanced hyperspectral remote sensing system for pipeline monitoring

    Science.gov (United States)

    Keskin, Göksu; Teutsch, Caroline D.; Lenz, Andreas; Middelmann, Wolfgang

    2015-10-01

    Areas occupied by oil pipelines and storage facilities are prone to severe contamination due to leaks caused by natural forces, poor maintenance or third parties. These threats have to be detected as quickly as possible in order to prevent serious environmental damage. Periodical and emergency monitoring activities need to be carried out for successful disaster management and pollution minimization. Airborne remote sensing stands out as an appropriate choice to operate either in an emergency or periodically. Hydrocarbon Index (HI) and Hydrocarbon Detection Index (HDI) utilize the unique absorption features of hydrocarbon based materials at SWIR spectral region. These band ratio based methods require no a priori knowledge of the reference spectrum and can be calculated in real time. This work introduces a flexible airborne pipeline monitoring system based on the online quasi-operational hyperspectral remote sensing system developed at Fraunhofer IOSB, utilizing HI and HDI for oil leak detection on the data acquired by an SWIR imaging sensor. Robustness of HI and HDI compared to state of the art detection algorithms is evaluated in an experimental setup using a synthetic dataset, which was prepared in a systematic way to simulate linear mixtures of selected background and oil spectra consisting of gradually decreasing percentages of oil content. Real airborne measurements in Ettlingen, Germany are used to gather background data while the crude oil spectrum was measured with a field spectrometer. The results indicate that the system can be utilized for online and offline monitoring activities.

  1. Selection of concepts for monitored retrievable storage of spent nuclear fuel and high-level radioactive wastes

    International Nuclear Information System (INIS)

    1984-04-01

    The monitored retrievable storage (MRS) concepts considered are: metal cask (stationary and transportable); concrete cask (sealed storage cask); concrete cask-in-trench; field drywell; tunnel drywell; open cycle vault; closed cycle vault; and tunnel rack vault. These concepts were compared primarily upon the relative performance of the storage units on seven criteria which together encompass the key considerations for selecting an MRS concept, namely their ability to satisfy the MRS mission requirements. These criteria were: safety and licensing; environmental impacts; socioeconomic impacts; siting requirements; cost; concept maturity; and flexibility. Evaluations of the candidate concepts indicate that all of the concepts could satisfactorily serve in an MRS facility. However, using the above criteria, the two concepts selected for further design studies are the concrete cask (primary concept), better entitled the sealed storage cask, and the field drywell (alternate concept). It was recognized that the transportable metal storage cask may be used to supplement at-reactor storage until such time as the repository or MRS becomes available. Consequently, a hybrid storage facility may be required (e.g., one using concrete casks or field drywells, with the capability of receiving and storing the transportable cask). Both the concrete cask and the field drywell concepts can easily accommodate the transportable cask. Further design efforts will ensure the compatibility of the MRS designs with the transportable cask

  2. Instructions for operating LBL Passive Environmental Radon Monitor (PERM)

    International Nuclear Information System (INIS)

    Boegel, M.L.; Nazaroff, W.W.; Ingersoll, J.G.

    1979-08-01

    The Passive Environmental Radon Monitor (PERM) is used to assess the impact of energy conservation in buildings, with reduced ventilation. Reduced ventilation can lead to increased concentration of air contaminants. The instrument operates on the principle of electrostatic collection of 218 Po ions. Cumulative alpha activity collects on the electrode and is detected with a lithium fluoride thermoluminescent detector

  3. 4th International Conference on Condition Monitoring of Machinery in Non-Stationary Operations

    CERN Document Server

    Zimroz, Radoslaw; Bartelmus, Walter; Haddar, Mohamed

    2016-01-01

    The book provides readers with a snapshot of recent research and technological trends in the field of condition monitoring of machinery working under a broad range of operating conditions. Each chapter, accepted after a rigorous peer-review process, reports on an original piece of work presented and discussed at the 4th International Conference on Condition Monitoring of Machinery in Non-stationary Operations, CMMNO 2014, held on December 15-16, 2014, in Lyon, France. The contributions have been grouped into three different sections according to the main subfield (signal processing, data mining, or condition monitoring techniques) they are related to. The book includes both theoretical developments as well as a number of industrial case studies, in different areas including, but not limited to: noise and vibration; vibro-acoustic diagnosis; signal processing techniques; diagnostic data analysis; instantaneous speed identification; monitoring and diagnostic systems; and dynamic and fault modeling. This book no...

  4. Assessment of nonintrusive methods for monitoring the operational readiness of solenoid-operated valves

    International Nuclear Information System (INIS)

    Kryter, R.C.

    1988-01-01

    Solenoid-operated valves (SOVs) are being studied at Oak Ridge National Laboratory as part of the USNRC Nuclear Plant Aging Research (NPAR) Program. The primary objective of the study is to identify and recommend methods for inspection, surveillance, and maintenance of SOVs that can ensure their operational readiness-- that is, their ability to perform required safety functions under all anticipated operating conditions. An earlier (Phase I) study described SOV failure modes and causes and identified measurable parameters that might be used to monitor the various degradations that lead to functional failure. The present (Phase II) study focuses on devising and then demonstrating the effectiveness of techniques and/or equipment with which to measure the previously identified performance parameters and thus detect and trend the progress of any degradation. Several nonintrusive techniques are currently under investigation. Recent experimental results which demonstrate the feasibility and practicality of the techniques being studied are presented. 4 refs., 6 figs., 2 tabs

  5. Concept for Sustainable Dose Reduction in Operating BWRs and PWRs with FSD (Full System decontamination)

    Energy Technology Data Exchange (ETDEWEB)

    Sempere Belda, L.; Stiepani, C.; Topf, C.

    2011-07-01

    Nuclear power plants experience an increase in dose rates during operation due to the build-up of the activity inventory. The activity build-up is influenced by the construction materials, past and present water chemistries, and the individual operating history of the plant. Depending on these factors the dose levels in an operating plant may reach a point in which concrete actions to reduce the overall radiation exposure become necessary. AREVA has developed the Concept for Sustainable Dose Reduction in Operating BWRs and PWRs. This is a program of joint corrective measures to minimize dose levels and keep them low for continued operation. It can be applied in plants from all constructors and designs. The concept is put into practice through the coordinated application of proven technologies, including: . Full System Decontamination to minimize the activity inventory . The formation of new, very stable protective oxides on the system surfaces including injection of depleted zinc . Introduction of advanced water chemistry for maintaining the low dose levels achieved during ongoing operation The implementation of this program is particularly interesting for plants with a long operation history, especially when considering life extension. A description of the activities involved is provided, including an approximate timeline for the implementation from the initial planning stages until completion.

  6. Concept for Sustainable Dose Reduction in Operating BWRs and PWRs with FSD (Full System decontamination)

    International Nuclear Information System (INIS)

    Sempere Belda, L.; Stiepani, C.; Topf, C.

    2011-01-01

    Nuclear power plants experience an increase in dose rates during operation due to the build-up of the activity inventory. The activity build-up is influenced by the construction materials, past and present water chemistries, and the individual operating history of the plant. Depending on these factors the dose levels in an operating plant may reach a point in which concrete actions to reduce the overall radiation exposure become necessary. AREVA has developed the Concept for Sustainable Dose Reduction in Operating BWRs and PWRs. This is a program of joint corrective measures to minimize dose levels and keep them low for continued operation. It can be applied in plants from all constructors and designs. The concept is put into practice through the coordinated application of proven technologies, including: . Full System Decontamination to minimize the activity inventory . The formation of new, very stable protective oxides on the system surfaces including injection of depleted zinc . Introduction of advanced water chemistry for maintaining the low dose levels achieved during ongoing operation The implementation of this program is particularly interesting for plants with a long operation history, especially when considering life extension. A description of the activities involved is provided, including an approximate timeline for the implementation from the initial planning stages until completion.

  7. User interaction concept for plasma discharge control on WENDELSTEIN 7-X

    International Nuclear Information System (INIS)

    Spring, Anett; Laqua, Heike; Niedermeyer, Helmut

    2006-01-01

    The requirements to the user interfaces arising from the concept of segmented discharges allowing short pulses and steady state operation and from the distributed hierarchical structure of the experiment are discussed. The modular design of the user interfaces is presented including specialised tools for preparation, manipulating, and monitoring the discharge operation. The user guidance and the mapping of complex control procedures onto a physically relevant view on the plasma discharge process will be vitally important. The feasibility of the user interaction concept could already be validated on a prototype installation and during commissioning of the first technical WENDELSTEIN 7-X (W7-X) components

  8. Brazilian liquefied natural gas terminals: from the conception to the operation

    Energy Technology Data Exchange (ETDEWEB)

    Santos, Renata N.R. dos; Lemos, Marcelo C. de; Silva, Marcos Jose M. da; Borges, Jorge Luiz P.; Soares, Fabio L.; Grieco, Eduardo P.; Melchior, Jose Carlos [PETROBRAS Transporte S.A. (TRANSPETRO), Rio de Janeiro, RJ (Brazil)

    2009-12-19

    To guarantee more flexibility and safety in supplying natural gas to the Brazilian market, PETROBRAS designed and constructed two liquefied natural gas (LNG) regasification terminals. These terminals are unprecedented in the world since they are the only ones to use vessels that have been adapted to store LNG and re gasify the product onboard and to adopt the model of transferring LNG from a supply ship to a regasification vessel via cryogenic arms. Due to these different characteristics, TRANSPETRO, the PETROBRAS subsidiary in charge of operating these terminals, had to prepare itself not only to deal with a new product but also to operate terminals that have no counterparts in the world. This article gives an overview of the LNG supply chain and of the new Brazilian LNG Terminals from their conception to the preparation process to operate them. (author)

  9. Impact of the internal contamination monitoring for national and international regulations

    International Nuclear Information System (INIS)

    Gaburo, J.C.; Sordi, G.M.

    1996-01-01

    An evaluation of the internal radiation dose received by workers between 1984 and 1994 was performed, after a brief description of IPEN facility. The National and International Recommendation aims to reduce the workers' doses below 1/10 of the annual limits. The routine monitoring should be eliminated, if the individual annual dose is below 3/10 of the annual limits. In this case, only the operational monitoring should be maintained. In principle, the concept of restricted area should be reviewed, because, according to Publication 26 of ICRP, 1977, it should be a supervised area instead. The new concept of restricted area recommended by the Publication 60, ICRP 1991, should be adjusted accordingly. Thus, the classification used by the Commission-controlled areas and supervised areas will be with the foreseeable dose and not with the actual dose. When the individual annual dose is kept below 1/10 of the annual limits, the routine monitoring is not necessary, and only operational monitoring is needed. Finally, the future possible activities of the Individual Internal Dosimetry Laboratory at IPEN are discussed, after the elimination of individual monitoring. (authors). 8 refs

  10. Reliability analysis of operator's monitoring behavior in digital main control room of nuclear power plants and its application

    International Nuclear Information System (INIS)

    Zhang Li; Hu Hong; Li Pengcheng; Jiang Jianjun; Yi Cannan; Chen Qingqing

    2015-01-01

    In order to build a quantitative model to analyze operators' monitoring behavior reliability of digital main control room of nuclear power plants, based on the analysis of the design characteristics of digital main control room of a nuclear power plant and operator's monitoring behavior, and combining with operators' monitoring behavior process, monitoring behavior reliability was divided into three parts including information transfer reliability among screens, inside-screen information sampling reliability and information detection reliability. Quantitative calculation model of information transfer reliability among screens was established based on Senders's monitoring theory; the inside screen information sampling reliability model was established based on the allocation theory of attention resources; and considering the performance shaping factor causality, a fuzzy Bayesian method was presented to quantify information detection reliability and an example of application was given. The results show that the established model of monitoring behavior reliability gives an objective description for monitoring process, which can quantify the monitoring reliability and overcome the shortcomings of traditional methods. Therefore, it provides theoretical support for operator's monitoring behavior reliability analysis in digital main control room of nuclear power plants and improves the precision of human reliability analysis. (authors)

  11. Monitoring and operational support on nuclear power plants using an artificial intelligence system

    International Nuclear Information System (INIS)

    Bianchi, P.H.; Baptista Filho, B.D.

    2009-01-01

    The monitoring task in nuclear power plants is of crucial importance with respect to safety and efficient operation. The operators have a wide range of variables to observe and analyze; the quantity of variables and their behavior determine the time they have to take correct decisions. The complexity of such aspects in a nuclear power plant influences both, the plant operational efficiency and the general safety issues. This paper describes an experimental system developed by the authors which aims to assist the operators of nuclear power plants to take quick and safe decisions. The system maps the status of plant and helps the operators to make quick judgments by using artificial intelligence methods. The method makes use of a small set of monitored variables and presents a map of the plant status in a friendly manner. This system uses an architecture that has multiple self-organizing maps to perform these tasks. (author)

  12. Monitoring and operational support on nuclear power plants using an artificial intelligence system

    Energy Technology Data Exchange (ETDEWEB)

    Bianchi, Paulo H.; Baptista Filho, Benedito D., E-mail: phbianchi@gmail.co, E-mail: bdbfilho@ipen.b [Instituto de Pesquisas Energeticas e Nucleares (IPEN/CNEN-SP), Sao Paulo, SP (Brazil)

    2009-07-01

    The monitoring task in nuclear power plants is of crucial importance with respect to safety and efficient operation. The operators have a wide range of variables to observe and analyze; the quantity of variables and their behavior determine the time they have to take correct decisions. The complexity of such aspects in a nuclear power plant influences both, the plant operational efficiency and the general safety issues. This paper describes an experimental system developed by the authors which aims to assist the operators of nuclear power plants to take quick and safe decisions. The system maps the status of plant and helps the operators to make quick judgments by using artificial intelligence methods. The method makes use of a small set of monitored variables and presents a map of the plant status in a friendly manner. This system uses an architecture that has multiple self-organizing maps to perform these tasks. (author)

  13. Crew-Centered Operations: What HAL 9000 Should Have Been

    Science.gov (United States)

    Korsmeyer, David J.; Clancy, Daniel J.; Crawford, James M.; Drummond, Mark E.

    2005-01-01

    To date, manned space flight has maintained the locus of control for the mission on the ground. Mission control performs tasks such as activity planning, system health management, resource allocation, and astronaut health monitoring. Future exploration missions require the locus of control to shift to on-board due light speed constraints and potential loss of communication. The lunar campaign must begin to utilize a shared control approach to validate and understand the limitations of the technology allowing astronauts to oversee and direct aspects of operation that require timely decision making. Crew-centered Operations require a system-level approach that integrates multiple technologies together to allow a crew-prime concept of operations. This paper will provide an overview of the driving mission requirements, highlighting the limitations of existing approaches to mission operations and identifying the critical technologies necessary to enable a crew-centered mode of operations. The paper will focus on the requirements, trade spaces, and concepts for fulfillment of this capability. The paper will provide a broad overview of relevant technologies including: Activity Planning and Scheduling; System Monitoring; Repair and Recovery; Crew Work Practices.

  14. Significance of Operating Environment in Condition Monitoring of Large Civil Structures

    Directory of Open Access Journals (Sweden)

    Sreenivas Alampalli

    1999-01-01

    Full Text Available Success of remote long-term condition monitoring of large civil structures and developing calibrated analytical models for damage detection, depend significantly on establishing accurate baseline signatures and their sensitivity. Most studies reported in the literature concentrated on the effect of structural damage on modal parameters without emphasis on reliability of modal parameters. Thus, a field bridge structure was studied for the significance of operating conditions in relation to baseline signatures. Results indicate that in practice, civil structures should be monitored for at least one full cycle of in-service environmental changes before establishing baselines for condition monitoring or calibrating finite-element models. Boundary conditions deserve special attention.

  15. Utilization of ISS to Develop and Test Operational Concepts and Hardware for Low-Gravity Terrestrial EVA

    Science.gov (United States)

    Gast, Matthew A.

    2010-01-01

    NASA has considerable experience in two areas of Extravehicular Activities (EVA). The first can be defined as microgravity, orbital EVAs. This consists of everything done in low Earth orbit (LEO), from the early, proof of concept EVAs conducted during the Gemini program of the 1960s, to the complex International Space Station (ISS) assembly tasks of the first decade of the 21st century. The second area of expertise is comprised of those EVAs conducted on the lunar surface, under a gravitational force one-sixth that of Earth. This EVA expertise encapsulates two extremes - microgravity and Earthlike gravitation - but is insufficient as humans expand their exploration purview, most notably with respect to spacewalks conducted on very low-gravity bodies, such as near- Earth objects (NEO) and the moons of Mars. The operational and technical challenges of this category of EVA have yet to be significantly examined, and as such, only a small number of operational concepts have been proposed thus far. To ensure mission success, however, EVA techniques must be developed and vetted to allow the selection of operational concepts that can be utilized across an assortment of destinations whose physical characteristics vary. This paper examines the utilization of ISS-based EVAs to test operational concepts and hardware in preparation for a low-gravity terrestrial EVA. While the ISS cannot mimic some of the fundamental challenges of a low-gravity terrestrial EVA - such as rotation rate and surface composition - it may be the most effective test bed available.

  16. Operations and Maintenance Concept Plan for the Immobilized High Level Waste (IHLW) Interim Storage Facility

    Energy Technology Data Exchange (ETDEWEB)

    JANIN, L.F.

    2000-08-30

    This O&M Concept looks at the future operations and maintenance of the IHLW/CSB interim storage facility. It defines the overall strategy, objectives, and functional requirements for the portion of the building to be utilized by Project W-464. The concept supports the tasks of safety basis planning, risk mitigation, alternative analysis, decision making, etc. and will be updated as required to support the evolving design.

  17. Operations and Maintenance Concept Plan for the Immobilized High-Level Waste (IHLW) Interim Storage Facility

    International Nuclear Information System (INIS)

    JANIN, L.F.

    2000-01-01

    This OandM Concept looks at the future operations and maintenance of the IHLW/CSB interim storage facility. It defines the overall strategy, objectives, and functional requirements for the portion of the building to be utilized by Project W-464. The concept supports the tasks of safety basis planning, risk mitigation, alternative analysis, decision making, etc. and will be updated as required to support the evolving design

  18. Centralized environmental radiation monitoring system in JAERI

    International Nuclear Information System (INIS)

    Katagiri, Hiroshi; Kobayashi, Hideo

    1993-03-01

    Japan Atomic Energy Research Institute (JAERI) has continued the radiation background survey and environmental radiation monitoring to ensure the safety of the residents around the Institute. For the monitoring of β and γ radiations and α and β radioactivities in air, the centralized automatic environmental radiation monitoring system (EMS) applying a computer with monitoring stations (MS) was established. The system has been renewed twice in 1973 and 1988. In 1962, a new concept emergency environmental γ-ray monitoring system (MP) was begun to construct and completed in 1965 independent of EMS. The first renewal of the EMS was carried out by focusing on the rapid and synthetic judgement and estimation of the environmental impacts caused by radiation and radioactive materials due to the operation of nuclear facilities by centralizing the data measured at MS, MP, a meteorological station, stack monitors and drainage monitoring stations under the control of computer. Present system renewed in 1988 was designed to prevent the interruption of monitoring due to computer troubles, communication troubles and power failures especially an instant voltage drop caused by thunder by reflecting the experiences through the operation and maintenance of the former system. Dual telemeters whose power is constantly supplied via batteries (capable of 10 min. monitoring after power failure) are equipped in the monitoring center to cope with telemeter troubles, which has operated successfully without any suspension being attributable to the power failures and telemeter troubles. (J.P.N.)

  19. Low-level radioactive gas monitor for natural gas operations

    International Nuclear Information System (INIS)

    Armstrong, F.E.

    1969-11-01

    A portable radioactivity detection system for monitoring the tritium content of natural gas under field conditions has been developed. The sensing device employed is a complex proportional counting assembly operated without the use of massive shielding previously employed with such low-level radiation detectors. The practical limit of detection for the system is a tritium content of 10 -9 microcurie per cc of natural gas. All components of the system are packaged in three waterproof cases weighing slightly less than 30 kg each. Power requirement is 500 watts of 120 volt, 60 Hz current. Operation is fully automatic with a printed record produced at predetermined time intervals

  20. Study on a self diagnostic monitoring system for an air-operated valve: development of a fault library

    International Nuclear Information System (INIS)

    Chai, Jang Bom; Kim, Yun Chul; Kim, Woo Shik; Cho, Hang Duke

    2004-01-01

    In the interest of nuclear power plant safety, a Self-Diagnostic Monitoring System (SDMS) is needed to monitor defects in safety-related components. An Air-Operated Valve (AOV) is one of the components to be monitored since the failure of its operation could potentially have catastrophic consequences. In this paper, a model of the AOV is developed with the parameters that affect the operational characteristics. The model is useful for both understanding the operation and correlating parameters and defects. Various defects are introduced in the experiments to construct a fault library, which will be used in a pattern recognition approach. Finally, the validity of the fault library is examined

  1. New developments in French transient monitoring: SYSFAC

    International Nuclear Information System (INIS)

    L'huby, Y.; Genette, P.; Faidy, C.; Kappler, F.; Balley, J.; Bimont, G.

    1991-01-01

    After more than ten years of experience with Transient Monitoring and Logging Procedure (TMLP) and six years of successfully experience with Fatiguemeters, EDF has decided to study a new concept of Fatigue Monitoring System: SYSFAC. This new automatic system which is developed to be operating in all the French PWR units is composed of three modules: mechanical transient logging, functional transient logging and fatiguemeters. This application must be connected to the on-site data acquisition system without complementary instrumentation on the plant. (author)

  2. H-II Transfer Vehicle (HTV) and the Operations Concept for Extravehicular Activity (EVA) Hardware

    Science.gov (United States)

    Chullen, Cinda; Blome, Elizabeth; Tetsuya, Sakashita

    2011-01-01

    With the retirement of the Space Shuttle fleet imminent in 2011, a new operations concept will become reality to meet the transportation challenges of the International Space Station (ISS). The planning associated with the retirement of the Space Shuttle has been underway since the announcement in 2004. Since then, several companies and government entities have had to look for innovative low-cost commercial orbital transportation systems to continue to achieve the objectives of ISS delivery requirements. Several options have been assessed and appear ready to meet the large and demanding delivery requirements of the ISS. Options that have been identified that can facilitate the challenge include the Russian Federal Space Agency's Soyuz and Progress spacecraft, European Space Agency's Automated Transfer Vehicle (ATV), and the Japan Aerospace Exploration Agency's (JAXA s) H-II Transfer Vehicle (HTV). The newest of these options is the JAXA's HTV. This paper focuses on the HTV, mission architecture and operations concept for Extra-Vehicular Activities (EVA) hardware, the associated launch system, and details of the launch operations approach.

  3. Concept for a solid-state multi-parameter sensor system for cell-culture monitoring

    International Nuclear Information System (INIS)

    Baecker, M.; Beging, S.; Biselli, M.; Poghossian, A.; Wang, J.; Zang, W.; Wagner, P.; Schoening, M.J.

    2009-01-01

    In this study, a concept for a silicon-based modular solid-state sensor system for inline multi-parameter monitoring of cell-culture fermentation processes is presented. The envisaged multi-parameter sensor system consists of two identical sensor modules and is intended for continuous quantification of up to five (bio-)chemical and physical parameters, namely, glucose and glutamine concentration, pH value, electrolyte conductivity and temperature by applying different transducer principles and/or different operation modes. Experimental results for the field-effect electrolyte-insulator-semiconductor (EIS) sterilisable pH sensor and electrolyte conductivity sensor based on interdigitated electrodes are presented. The ongoing autoclaving does not have any significant impact on the pH-sensitive properties of a Ta 2 O 5 -gate EIS sensor. Even after 30 autoclaving cycles, the pH sensors show a clear pH response and nearly linear calibration curve with a slope of 57 ± 1 mV/pH. Additional scanning electron microscopy and ellipsometric investigations do not show any visible surface degradation or changes in the thickness of the pH-sensitive Ta 2 O 5 layer. The preliminary results demonstrate the suitability of the developed EIS sensor for an inline pH measurement during a fermentation process. In addition, interdigitated electrodes of different geometries serving as electrolyte conductivity sensor have been tested for measurements in relatively high ionic-strength solutions.

  4. Monitoring of peri-operative fluid administration by individualized goal-directed therapy

    DEFF Research Database (Denmark)

    Bundgaard-Nielsen, M; Holte, Kathrine; Secher, N H

    2007-01-01

    (n = 725) found a reduced hospital stay. Post-operative nausea and vomiting (PONV) and ileus were reduced in three studies and complications were reduced in four studies. Of the monitors that may be applied for goal-directed therapy, only oesophageal Doppler has been tested adequately; however......, several other options exist. CONCLUSION: Goal-directed therapy with the maximization of flow-related haemodynamic variables reduces hospital stay, PONV and complications, and facilitates faster gastrointestinal functional recovery. So far, oesophageal Doppler is recommended, but other monitors...

  5. A concept of customer–provider relation monitoring system solution

    Directory of Open Access Journals (Sweden)

    Naděžda Chalupová

    2008-01-01

    Full Text Available The contribution deals with design of customer–provider relationship monitoring system solution with regard to needs of business managers and analytics and to possibilities of contemporaneous information and communication technologies.The attention is followed to targeted modelling, what brings possibilities of acquisition of bigger overview about things taking place in the relation. In consequence it describes the functionality of analytical systems producing these very strategically valuable models – to so-called business intelligence tools. Onward it deals with modern technologies conductive to above mentioned system implementation – with Ajax concept and with some XML applications: PMML for analytical models manipulation, XSLT for XML data transformations to various formats, SVG for representing pictures of statistical graphs etc. and MathML for description of mathematical formulas created in analytical systems.Following these basis it suggests technological solution of some parts of client–provider relationship watching and evaluating system and it discusses its potential advantages and problems, which can occur.

  6. Compilation of Energy Efficient Concepts in Advanced Aircraft Design and Operations. Volume 1. Technical report

    National Research Council Canada - National Science Library

    Clyman, Milton

    1980-01-01

    .... The search addressed the technologies necessary to support next generation (IOC 1990+) air vehicle design and operation concepts that will reduce the requirement for natural petroleum-derived energy...

  7. Air Traffic Management Technology Demonstration-1 Concept of Operations (ATD-1 ConOps), Version 2.0

    Science.gov (United States)

    Baxley, Brian T.; Johnson, William C.; Swenson, Harry N.; Robinson, John E.; Prevot, Tom; Callantine, Todd J.; Scardina, John; Greene, Michael

    2013-01-01

    This document is an update to the operations and procedures envisioned for NASA s Air Traffic Management (ATM) Technology Demonstration #1 (ATD-1). The ATD-1 Concept of Operations (ConOps) integrates three NASA technologies to achieve high throughput, fuel-efficient arrival operations into busy terminal airspace. They are Traffic Management Advisor with Terminal Metering (TMA-TM) for precise time-based schedules to the runway and points within the terminal area, Controller-Managed Spacing (CMS) decision support tools for terminal controllers to better manage aircraft delay using speed control, and Flight deck Interval Management (FIM) avionics and flight crew procedures to conduct airborne spacing operations. The ATD-1 concept provides de-conflicted and efficient operations of multiple arrival streams of aircraft, passing through multiple merge points, from top-of-descent (TOD) to the Final Approach Fix. These arrival streams are Optimized Profile Descents (OPDs) from en route altitude to the runway, using primarily speed control to maintain separation and schedule. The ATD-1 project is currently addressing the challenges of integrating the three technologies, and their implantation into an operational environment. The ATD-1 goals include increasing the throughput of high-density airports, reducing controller workload, increasing efficiency of arrival operations and the frequency of trajectory-based operations, and promoting aircraft ADS-B equipage.

  8. Orbital Hub: a concept for human spaceflight beyond ISS operations

    Science.gov (United States)

    Jahnke, Stephan S.; Maiwald, Volker; Philpot, Claudia; Quantius, Dominik; Romberg, Oliver; Seboldt, Wolfgang; Vrakking, Vincent; Zeidler, Conrad

    2018-04-01

    The International Space Station (ISS) is the greatest endeavour in low-Earth orbit since the beginning of the space age and the culmination of human outposts like Skylab and Mir. While a clear schedule has yet to be drafted, it is expected that ISS will cease operation in the 2020s. What could be the layout for a human outpost in LEO with lessons learnt from ISS? What are the use cases and applications of such an outpost in the future? The System Analysis Space Segment group of the German Aerospace Center investigated these and other questions and developed the Orbital Hub concept. In this paper an overview is presented of how the overall concept has been derived and its properties and layouts are described. Starting with a workshop involving the science community, the scientific requirements have been derived and Strawman payloads have been defined for use in further design activities. These design activities focused on Concurrent Engineering studies, where besides DLR employees participants from the industry and astronauts were involved. The result is an expandable concept that is composed of two main parts, the Base Platform, home for a permanent crew of up to three astronauts, and the Free Flyer, an uncrewed autonomous research platform. This modular approach provides one major advantage: the decoupling of the habitat and payload leading to increased quality of the micro-gravity environment. The former provides an environment for human physiology experiments, while the latter allows science without the perturbations caused by a crew, e.g. material experiments or Earth observation. The Free Flyer is designed to operate for up to 3 months on its own, but can dock with the space station for maintenance and experiment servicing. It also has a hybrid propulsion system, chemical and electrical, for different applications. The hub's design allows launch with just three launches, as the total mass of all the hub parts is about 60,000 kg. The main focus of the design is

  9. Concept of voltage monitoring for a nuclear power plant emergency power supply system (PWR 1300 MWe)

    International Nuclear Information System (INIS)

    Andrade, R.B. de

    1988-01-01

    Voltage monitoring concept for a Nuclear Power Plant Emergency Power Supply Systems (PWR 1300 MWe) is described based on the phylosophy adopted for Angra 2 and 3 NPP's. Some suggested setpoints are only guidance values and can be modified during plant commissioning for a better performance of the whole protection system. (author) [pt

  10. RCRA and operational monitoring 1994 fiscal year work plan, WBS 1.5.3

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    RCRA & Operational Monitoring (ROM) Program Office manages the direct funded Resource Conservation Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.5.3. The ROM Program Office is a Branch of liquid Waste Disposal, a part of Restoration and Remediation of Westinghouse Hanford Company (WHC). The Fiscal Year Work Plan (FYWP) takes it direction from the Multi-Year Program Plan (MYPP). The FYWP provides the near term, enhanced details for the Program Office to use as baseline Cost, Scope and Schedule. Changs Control administered during the fiscal year is against the baseline provided by the FYWP.

  11. RCRA and operational monitoring 1994 fiscal year work plan, WBS 1.5.3

    International Nuclear Information System (INIS)

    1993-12-01

    RCRA ampersand Operational Monitoring (ROM) Program Office manages the direct funded Resource Conservation Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.5.3. The ROM Program Office is a Branch of liquid Waste Disposal, a part of Restoration and Remediation of Westinghouse Hanford Company (WHC). The Fiscal Year Work Plan (FYWP) takes it direction from the Multi-Year Program Plan (MYPP). The FYWP provides the near term, enhanced details for the Program Office to use as baseline Cost, Scope and Schedule. Changs Control administered during the fiscal year is against the baseline provided by the FYWP

  12. Federal Radiological Monitoring and Assessment Center (FRMAC) overview of FRMAC operations

    International Nuclear Information System (INIS)

    1996-02-01

    In the event of a major radiological emergency, 17 federal agencies with various statutory responsibilities have agreed to coordinate their efforts at the emergency scene under the umbrella of the Federal Radiological Emergency Response plan (FRERP). This cooperative effort will assure the designated Lead Federal Agency (LFA) and the state(s) that all federal radiological assistance fully supports their efforts to protect the public. The mandated federal cooperation ensures that each agency can obtain the data critical to its specific responsibilities. This Overview of the Federal Radiological Monitoring and Assessment Center (FRMAC) Operations describes the FRMAC response activities to a major radiological emergency. It also describes the federal assets and subsequent operational activities which provide federal radiological monitoring and assessment of the off-site areas. These off-site areas may include one or more affected states

  13. Work Domain Analysis of a Predecessor Sodium-cooled Reactor as Baseline for AdvSMR Operational Concepts

    Energy Technology Data Exchange (ETDEWEB)

    Ronald Farris; David Gertman; Jacques Hugo

    2014-03-01

    This report presents the results of the Work Domain Analysis for the Experimental Breeder Reactor (EBR-II). This is part of the phase of the research designed to incorporate Cognitive Work Analysis in the development of a framework for the formalization of an Operational Concept (OpsCon) for Advanced Small Modular Reactors (AdvSMRs). For a new AdvSMR design, information obtained through Cognitive Work Analysis, combined with human performance criteria, can and should be used in during the operational phase of a plant to assess the crew performance aspects associated with identified AdvSMR operational concepts. The main objective of this phase was to develop an analytical and descriptive framework that will help systems and human factors engineers to understand the design and operational requirements of the emerging generation of small, advanced, multi-modular reactors. Using EBR-II as a predecessor to emerging sodium-cooled reactor designs required the application of a method suitable to the structured and systematic analysis of the plant to assist in identifying key features of the work associated with it and to clarify the operational and other constraints. The analysis included the identification and description of operating scenarios that were considered characteristic of this type of nuclear power plant. This is an invaluable aspect of Operational Concept development since it typically reveals aspects of future plant configurations that will have an impact on operations. These include, for example, the effect of core design, different coolants, reactor-to-power conversion unit ratios, modular plant layout, modular versus central control rooms, plant siting, and many more. Multi-modular plants in particular are expected to have a significant impact on overall OpsCon in general, and human performance in particular. To support unconventional modes of operation, the modern control room of a multi-module plant would typically require advanced HSIs that would

  14. Electric Bike Sharing--System Requirements and Operational Concepts

    Energy Technology Data Exchange (ETDEWEB)

    Cherry, Christopher; Worley, Stacy; Jordan, David

    2010-08-01

    Bike sharing is an exciting new model of public-private transportation provision that has quickly emerged in the past five years. Technological advances have overcome hurdles of early systems and cities throughout the globe are adopting this model of transportation service. Electric bikes have simultaneously gained popularity in many regions of the world and some have suggested that shared electric bikes could provide an even higher level of service compared to existing systems. There are several challenges that are unique to shared electric bikes: electric-assisted range, recharging protocol, and bike and battery checkout procedures. This paper outlines system requirements to successfully develop and deploy an electric bike sharing system, focusing on system architecture, operational concepts, and battery management. Although there is little empirical evidence, electric bike sharing could be feasible, depending on demand and battery management, and can potentially improve the utility of existing bike sharing systems. Under most documented bike sharing use scenarios, electric bike battery capacity is insufficient for a full day of operation, depending on recharging protocol. Off-board battery management is a promising solution to address this problem. Off-board battery management can also support solar recharging. Future pilot tests will be important and allow empirical evaluation of electric bikesharing system performance. (auth)

  15. The concept of early rehabilitation (fast track in operative gynecology

    Directory of Open Access Journals (Sweden)

    О. S. Lashkul

    2017-04-01

    Full Text Available Introduction. Application of laparoscopic techniques corresponds to the principles of the FTS maximally. Aim – to assess the impact of the early multimodal rehabilitation concept use on the postoperative period. Material and Methods. The study involved 39 patients who were randomized by method of envelopes into two groups. In the basic group (20 patients a multimodal protocol of early rehabilitation was used. In the control group (19 patients a traditional perioperative regimen was performed. In both groups, vaginal hysterectomy with laparoscopic support under general anesthesia combined with mechanical ventilation was carried out. Fentanyl analgesia (5 - 3 mcg / kg / hr and 0.5% bupivacaine solution into epidural space (6.8 mL were given. The volume of the infusion in the main group was 5 - 6 ml / kg / h, in the control group - 10 ml / kg / hr. The perioperative analgesia included NSAIDs (deksetoprofen, ketorolac, paracetamol. Noninvasive monitoring was carried out by monitor "Leon" (blood pressure, heart rate, capnogram, the hourly diuresis was taken into account, and thermometry was done. Postoperatively in both groups 24 hours prolonged epidural analgesia with small boluses of 0.25% bupivacaine solution (4 ml / hour in combination with systemic injection of dexketoprofen (100-150 mg / day + ketorolac (60 mg / day + paracetamol (2000 mg / day was used. Results. The groups were homogeneous by anamnestic (the onset of menstruation, number of pregnancies, childbirths, induced abortions, spontaneous abortions, anthropometric and demographic characteristics, by the duration of operations and the reference levels of systolic, diastolic, mean arterial pressure and heart rate. The volume of blood loss (ml in patients with FTS was (282 ± 22, in patients of the control group - (347±21, p˂0.05. Intraoperative hemohydrobalance (ml in patients with FTS was (547 ± 57, in the control group - (942 ± 62, p˂0.05. The postoperative bed-day index in

  16. Overview of condition monitoring and operation control of electric power conversion systems in direct-drive wind turbines under faults

    Science.gov (United States)

    Huang, Shoudao; Wu, Xuan; Liu, Xiao; Gao, Jian; He, Yunze

    2017-09-01

    Electric power conversion system (EPCS), which consists of a generator and power converter, is one of the most important subsystems in a direct-drive wind turbine (DD-WT). However, this component accounts for the most failures (approximately 60% of the total number) in the entire DD-WT system according to statistical data. To improve the reliability of EPCSs and reduce the operation and maintenance cost of DD-WTs, numerous researchers have studied condition monitoring (CM) and fault diagnostics (FD). Numerous CM and FD techniques, which have respective advantages and disadvantages, have emerged. This paper provides an overview of the CM, FD, and operation control of EPCSs in DD-WTs under faults. After introducing the functional principle and structure of EPCS, this survey discusses the common failures in wind generators and power converters; briefly reviewed CM and FD methods and operation control of these generators and power converters under faults; and discussed the grid voltage faults related to EPCSs in DD-WTs. These theories and their related technical concepts are systematically discussed. Finally, predicted development trends are presented. The paper provides a valuable reference for developing service quality evaluation methods and fault operation control systems to achieve high-performance and high-intelligence DD-WTs.

  17. NPP post-accident monitoring system based on unmanned aircraft vehicle:concept, design principles

    International Nuclear Information System (INIS)

    Sachenko, A.A.; Kochan, V.V.; Kharchenko, V.S.; Yanovskij, M.Eh.; Yastrebenetskij, M.A.; Fesenko, G.V.

    2016-01-01

    The paper presents a concept of designing the post-accident system for monitoring the equipment and territory of nuclear power plant after a severe accident based on unmanned aircraft vehicle (UAVs). Wired power and communications networks are found out as the most vulnerable ones during the accident monitoring, and informativity, reliability and veracity are recognized as system basic parameters. It is proposed to equip measurement and control modules with backup wireless communication channels and deploy the repeaters network based on UAVs to ensure the informativity. Modules possess the backup power battery, and repeaters appear in the appropriate places after the accident to provide the survivability. Moreover, an optimization of UAVs' location is proposed according to the minimum energy consumption criterion. To ensure the veracity, it is expected to design the noise-immune protocol for message exchange and archiving and self-diagnostics of all system components

  18. The use of check valve performance data to support new concepts (probabilistic risk assessment, condition monitoring) for check valve program

    Energy Technology Data Exchange (ETDEWEB)

    Hart, K.A.; Gower, D.

    1996-12-01

    The concept of developing an integrated check valve database based on the Nuclear Power Reliability Data System (NPRDS) data was presented at the last Symposium. The Nuclear Industry Check Valve Group (NIC), working in cooperation with the Oak Ridge National Laboratory (ORNL), has completed an operational database of check valve performance from 1984 to the present. NIC has committed to the nuclear industry to periodically update the data and maintain this information accessible. As the new concepts of probabilistic risk analysis and condition monitoring are integrated into the American Society of Mechanical Engineers (ASME) Code, a critical element will be performance data. From check valve performance data, feasible failure modes and rates can be established. When a failure rate or frequency of failures can be established based on a significant enough population (sampling), a more solid foundation for focusing resources and determining appropriate frequencies and testing can be determined. The presentation will give the updated status of the NIC Check Valve Performance Database covering (1) methodology used to combine the original ORNL data; (2) process/controls established for continuing update and refinement of the data; (3) discussion of how this data is being utilized by (a) OM-22 for condition monitoring, and (b) risk-based inservice testing work of Westinghouse Owners` Group; and (4) results/trends of data evaluations. At the 1994 Symposium, ORNL provided an update as of 1991 to their original work of 1984 -1990 which they had performed to characterize check valve degradations and failures in the nuclear industry. These characterizations will be updated to 1995 and additional reviews provided to give insight into the current condition and trends of check valve performance.

  19. The use of check valve performance data to support new concepts (probabilistic risk assessment, condition monitoring) for check valve program

    International Nuclear Information System (INIS)

    Hart, K.A.; Gower, D.

    1996-01-01

    The concept of developing an integrated check valve database based on the Nuclear Power Reliability Data System (NPRDS) data was presented at the last Symposium. The Nuclear Industry Check Valve Group (NIC), working in cooperation with the Oak Ridge National Laboratory (ORNL), has completed an operational database of check valve performance from 1984 to the present. NIC has committed to the nuclear industry to periodically update the data and maintain this information accessible. As the new concepts of probabilistic risk analysis and condition monitoring are integrated into the American Society of Mechanical Engineers (ASME) Code, a critical element will be performance data. From check valve performance data, feasible failure modes and rates can be established. When a failure rate or frequency of failures can be established based on a significant enough population (sampling), a more solid foundation for focusing resources and determining appropriate frequencies and testing can be determined. The presentation will give the updated status of the NIC Check Valve Performance Database covering (1) methodology used to combine the original ORNL data; (2) process/controls established for continuing update and refinement of the data; (3) discussion of how this data is being utilized by (a) OM-22 for condition monitoring, and (b) risk-based inservice testing work of Westinghouse Owners' Group; and (4) results/trends of data evaluations. At the 1994 Symposium, ORNL provided an update as of 1991 to their original work of 1984 -1990 which they had performed to characterize check valve degradations and failures in the nuclear industry. These characterizations will be updated to 1995 and additional reviews provided to give insight into the current condition and trends of check valve performance

  20. Prototype equipment status monitor for plant operational configuration management

    International Nuclear Information System (INIS)

    DeVerno, M.; Trask, D.; Groom, S.

    1998-01-01

    CANDU plants, such as the Point Lepreau GS, have tens of thousands of operable devices. The status of each operable device must be immediately available to plan and execute future changes to the plant. Historically, changes to the plant's operational configuration have been controlled using manual and administrative methods where the status of each operable device is maintained on operational flowsheets located in the work control area of the main control room. The operational flowsheets are used to plan and develop Operating Orders (OOs) or Order-to-Operate (OTOs) and the control centre work processes are used to manage their execution. After performing each OO procedure, the operational flowsheets are updated to reflect the new plant configuration. This process can be very time consuming, and due to the manual processes, can lead to the potential for time lags and errors in the recording of the current plant configuration. Through a cooperative research and development program, Canadian CANDU utilities and Atomic Energy of Canada Limited, the design organization, have applied modern information technologies to develop a prototype Equipment Status Monitor (ESM) to address processes and information flow for efficient operational configuration management. The ESM integrates electronic operational flowsheets, equipment databases, engineering and work management systems, and computerized procedures to assess, plan, execute, track, and record changes to the plant's operational configuration. This directly leads to improved change control, more timely and accurate plant status information, fewer errors, and better decision making regarding future changes. These improvements to managing the plant's operational configuration are essential to increasing plant safety, achieving a high plant availability, and maintaining high capability and capacity factors. (author)

  1. Development of a Simple Dipstick Assay for Operational Monitoring of DDT.

    Science.gov (United States)

    Ismail, Hanafy M; Kumar, Vijay; Singh, Rudra P; Williams, Christopher; Shivam, Pushkar; Ghosh, Ayan; Deb, Rinki; Foster, Geraldine M; Hemingway, Janet; Coleman, Michael; Coleman, Marlize; Das, Pradeep; Paine, Mark J I

    2016-01-01

    Indoor residual spraying (IRS) of DDT is used to control visceral leishmaniasis (VL) in India. However, the quality of spraying is severely compromised by a lack of affordable field assays to monitor target doses of insecticide. Our aim was to develop a simple DDT insecticide quantification kit (IQK) for monitoring DDT levels in an operational setting. DDT quantification was based on the stoichiometric release of chloride from DDT by alkaline hydrolysis and detection of the released ion using Quantab chloride detection strips. The assay was specific for insecticidal p,p`-DDT (LoQ = 0.082 g/m2). Bostik discs were effective in post spray wall sampling, extracting 25-70% of active ingredient depending on surface. Residual DDT was sampled from walls in Bihar state in India using Bostik adhesive discs and DDT concentrations (g p,p`-DDT/m2) were determined using IQK and HPLC (n = 1964 field samples). Analysis of 161 Bostik samples (pooled sample pairs) by IQK and HPLC produced excellent correlation (R2 = 0.96; Bland-Altman bias = -0.0038). IQK analysis of the remaining field samples matched HPLC data in identifying households that had been under sprayed, in range or over sprayed. A simple dipstick assay has been developed for monitoring DDT spraying that gives comparable results to HPLC. By making laboratory-based analysis of DDT dosing accessible to field operatives, routine monitoring of DDT levels can be promoted in low- and middle- income countries to maximise the effectiveness of IRS.

  2. Automated Long-Term Monitoring of Parallel Microfluidic Operations Applying a Machine Vision-Assisted Positioning Method

    Science.gov (United States)

    Yip, Hon Ming; Li, John C. S.; Cui, Xin; Gao, Qiannan; Leung, Chi Chiu

    2014-01-01

    As microfluidics has been applied extensively in many cell and biochemical applications, monitoring the related processes is an important requirement. In this work, we design and fabricate a high-throughput microfluidic device which contains 32 microchambers to perform automated parallel microfluidic operations and monitoring on an automated stage of a microscope. Images are captured at multiple spots on the device during the operations for monitoring samples in microchambers in parallel; yet the device positions may vary at different time points throughout operations as the device moves back and forth on a motorized microscopic stage. Here, we report an image-based positioning strategy to realign the chamber position before every recording of microscopic image. We fabricate alignment marks at defined locations next to the chambers in the microfluidic device as reference positions. We also develop image processing algorithms to recognize the chamber positions in real-time, followed by realigning the chambers to their preset positions in the captured images. We perform experiments to validate and characterize the device functionality and the automated realignment operation. Together, this microfluidic realignment strategy can be a platform technology to achieve precise positioning of multiple chambers for general microfluidic applications requiring long-term parallel monitoring of cell and biochemical activities. PMID:25133248

  3. Automated long-term monitoring of parallel microfluidic operations applying a machine vision-assisted positioning method.

    Science.gov (United States)

    Yip, Hon Ming; Li, John C S; Xie, Kai; Cui, Xin; Prasad, Agrim; Gao, Qiannan; Leung, Chi Chiu; Lam, Raymond H W

    2014-01-01

    As microfluidics has been applied extensively in many cell and biochemical applications, monitoring the related processes is an important requirement. In this work, we design and fabricate a high-throughput microfluidic device which contains 32 microchambers to perform automated parallel microfluidic operations and monitoring on an automated stage of a microscope. Images are captured at multiple spots on the device during the operations for monitoring samples in microchambers in parallel; yet the device positions may vary at different time points throughout operations as the device moves back and forth on a motorized microscopic stage. Here, we report an image-based positioning strategy to realign the chamber position before every recording of microscopic image. We fabricate alignment marks at defined locations next to the chambers in the microfluidic device as reference positions. We also develop image processing algorithms to recognize the chamber positions in real-time, followed by realigning the chambers to their preset positions in the captured images. We perform experiments to validate and characterize the device functionality and the automated realignment operation. Together, this microfluidic realignment strategy can be a platform technology to achieve precise positioning of multiple chambers for general microfluidic applications requiring long-term parallel monitoring of cell and biochemical activities.

  4. Automated Long-Term Monitoring of Parallel Microfluidic Operations Applying a Machine Vision-Assisted Positioning Method

    Directory of Open Access Journals (Sweden)

    Hon Ming Yip

    2014-01-01

    Full Text Available As microfluidics has been applied extensively in many cell and biochemical applications, monitoring the related processes is an important requirement. In this work, we design and fabricate a high-throughput microfluidic device which contains 32 microchambers to perform automated parallel microfluidic operations and monitoring on an automated stage of a microscope. Images are captured at multiple spots on the device during the operations for monitoring samples in microchambers in parallel; yet the device positions may vary at different time points throughout operations as the device moves back and forth on a motorized microscopic stage. Here, we report an image-based positioning strategy to realign the chamber position before every recording of microscopic image. We fabricate alignment marks at defined locations next to the chambers in the microfluidic device as reference positions. We also develop image processing algorithms to recognize the chamber positions in real-time, followed by realigning the chambers to their preset positions in the captured images. We perform experiments to validate and characterize the device functionality and the automated realignment operation. Together, this microfluidic realignment strategy can be a platform technology to achieve precise positioning of multiple chambers for general microfluidic applications requiring long-term parallel monitoring of cell and biochemical activities.

  5. Hardware and software concept of the remote monitoring system for nuclear reactors in Bavaria

    International Nuclear Information System (INIS)

    Gietl, G.

    1981-01-01

    The remote monitoring system for nuclear reactors (KFUe) is a fully automatic system for the measuring and registration of radioactive releases and of operation parameters of the nuclear power plants in Bavaria. It has also to measure the meteorological parameters on the site of a power plant for the purpose of dispersion calculations. The system consists of the network centre and the subsystems with their satellite stations at the nuclear power plants. Process computers in the network centre and in the subsystems perform the automatic operation and they handle the data transmission via data lines. The hardware of the entire system is so conceived that the mesured data can be processed, stored and displayed in an optimal way for the user. The software of the KFUe centre and the subsystems is structured strictly modular. Redunancies are implied in the hardware and software. The automatic remote air quality monitoring system of Bavaria (LUeB) can be operated as a stand-by system for the KFUe and vice versa in case of an emergency. (orig./HP) [de

  6. Crew aiding and automation: A system concept for terminal area operations, and guidelines for automation design

    Science.gov (United States)

    Dwyer, John P.

    1994-01-01

    This research and development program comprised two efforts: the development of guidelines for the design of automated systems, with particular emphasis on automation design that takes advantage of contextual information, and the concept-level design of a crew aiding system, the Terminal Area Navigation Decision Aiding Mediator (TANDAM). This concept outlines a system capable of organizing navigation and communication information and assisting the crew in executing the operations required in descent and approach. In service of this endeavor, problem definition activities were conducted that identified terminal area navigation and operational familiarization exercises addressing the terminal area navigation problem. Both airborne and ground-based (ATC) elements of aircraft control were extensively researched. The TANDAM system concept was then specified, and the crew interface and associated systems described. Additionally, three descent and approach scenarios were devised in order to illustrate the principal functions of the TANDAM system concept in relation to the crew, the aircraft, and ATC. A plan for the evaluation of the TANDAM system was established. The guidelines were developed based on reviews of relevant literature, and on experience gained in the design effort.

  7. Elaboration of Ariane 6 operational concept with a concurrent engineering approach

    OpenAIRE

    David, Emmanuelle

    2016-01-01

    In December 2014, the ESA Council at Ministerial level has decided to go ahead with the Ariane 6 and Vega-C development programmes. The overarching aim of Ariane 6 is to provide guaranteed access to space for Europe at a competitive price. ESA has the role of Procuring entity and Launch System Architect (LSA). As Launch System Architect, ESA ensures the coherence on the Launcher System and the Launch base in the elaboration of the operational concept. The ambitious High Level R...

  8. A boiling-water reactor concept for low radiation exposure based on operating experience

    International Nuclear Information System (INIS)

    Koine, Y.; Uchida, S.; Izumiya, M.; Miki, M.

    1983-01-01

    A review of boiling-water reactor (BWR) operating experience indicates the significant role of water chemistry in determining the radiation dose rate contributing to occupational exposure. The major contributor among the radioactive species involved is identified as 60 Co, produced by neutron activation of 59 Co originating from structural materials. Iron crud, a fine solid form of corrosion product in the reactor water, is also shown to enhance the radiation dose rate. A theoretical study, supported by the operating experience and an extensive confirmatory test, led to the computerized analytical model called DR CRUD which is capable of predicting long-term radiation dose buildup. It accounts for the mechanism of radiation buildup through corrosion products such as irons, cobalts and other radioactive elements; their generation, transport, activation, interaction and deposition in the reactor coolant system are simulated. A scoping analysis, using this model as a tool, establishes the base line of the BWR concept for low occupational exposure. The base line consists of a set of target values for an annual exposure of 200 man.rem in an 1100 MW(e) BWR unit. They are the parameters that will be built into the design such as iron and cobalt inputs to the reactor water, and the capability of the reactor and the condensate purification system. Applicable means of technology are identified to meet the targets, ranging from improved water chemistry to the purification technique, optimized material selection and the recommended operational procedure. Extensive test programmes provide specifications of these means for use in BWRs. Combinations of their application are reviewed to define the concept of reduced exposure. Analytical study verifies the effectiveness of the proposed BWR concept in achieving a low radiation dose rate; occupational exposure is reduced to 200 man.rem/a. (author)

  9. A Simulation Dashboard to Monitor Cognitive Workload during Dismounted Military Operations

    NARCIS (Netherlands)

    Beurden, M. van; Streefkerk, J.W.; Kamphuis, W.; Jetten, A.; Trijp, S. van; Venrooij, W.; Veldhuijs, G.

    2016-01-01

    The rapid development and adoption of new technologies (i.e. advanced sensor and communication platforms and monitoring devices) changes the way soldiers operate in the field. A concern frequently expressed by soldiers and commanders, is the increasing demand that technology places on the cognitive

  10. Monitoring large rotating machines at EDF

    International Nuclear Information System (INIS)

    Chevalier, R.; Bourgeois, P.; Le Reverend, D.

    1992-09-01

    At Electricite de France (EDF), since 1978, the operating instruments which ensure the DETECTION function, have been completed on turbogenerators by a specialized ''off-line'' vibration monitoring system, which allows a posteriori DIAGNOSIS analysis. However because of a need of a real time and more elaborated DETECTION function, the concept of the Monitoring and Diagnosis Aid Station (Poste de Surveillance et d'Aide au Diagnostic: PSAD) has been developed. It federates the processing of monitoring, organized into several functions, and includes the monitoring of turbogenerators (TGS) and reactor coolant pumps (RCP). The purpose of this paper is to present, on the one hand, the monitoring functions of TGS and RCP and on the other, the first experimental results on the behaviour of three RCP, obtained through a SAMT (Surveillance Automatisee des Machines Tournantes - Automatic monitoring of rotating machines) prototype. (authors). 2 figs., 4 tabs., 4 refs

  11. Toward the way forward: the national children's disaster mental health concept of operations.

    Science.gov (United States)

    Schreiber, Merritt; Pfefferbaum, Betty; Sayegh, Lisa

    2012-06-01

    Although increasing evidence suggests that children are at particular risk from disasters and evidence-based practices have been developed to triage and treat them effectively, no strategy or concept of operations linking best practices for disaster response is currently in place. To our knowledge, this report describes the first effort to address this critical gap and outlines a triage-driven children's disaster mental health incident response strategy for seamless preparedness, response, and recovery elements that can be used now. The national children's disaster mental health concept of operations (NCDMH CONOPS) details the essential elements needed for an interoperable, coordinated response for the mental health needs of children by local communities, counties, regions, and states to better meet the needs of children affected by disasters and terrorism incidents. This CONOPS for children proposes the use of an evidence-based, rapid triage system to provide a common data metric to incident response and recovery action and to rationally align limited resources to those at greater need in a population-based approach.

  12. Chemical shift-dependent apparent scalar couplings: An alternative concept of chemical shift monitoring in multi-dimensional NMR experiments

    International Nuclear Information System (INIS)

    Kwiatkowski, Witek; Riek, Roland

    2003-01-01

    The paper presents an alternative technique for chemical shift monitoring in a multi-dimensional NMR experiment. The monitored chemical shift is coded in the line-shape of a cross-peak through an apparent residual scalar coupling active during an established evolution period or acquisition. The size of the apparent scalar coupling is manipulated with an off-resonance radio-frequency pulse in order to correlate the size of the coupling with the position of the additional chemical shift. The strength of this concept is that chemical shift information is added without an additional evolution period and accompanying polarization transfer periods. This concept was incorporated into the three-dimensional triple-resonance experiment HNCA, adding the information of 1 H α chemical shifts. The experiment is called HNCA coded HA, since the chemical shift of 1 H α is coded in the line-shape of the cross-peak along the 13 C α dimension

  13. Military leadership with an operational effect in asymmetric operations - A new military leadership training concept in a new world

    DEFF Research Database (Denmark)

    Barfod, Jakob Rømer

    2015-01-01

    , which should help deploying units at battalion level to counter the increased complexity of leadership in asymmetric operations. Much attention is in this concept given to the preparation of teams performing these missions. The teams consist of leaders and personnel from very different organizational....... Suddenly, it was extremely important that the Danish Defence transformed to a more expeditionary force capable of conducting asymmetric operations in different environments far away from Denmark. This is not done overnight but demands a new situational awareness in proportion to the need for leadership....... As tactics, doctrines, technologies and procedures had to be developed and changed, there was also a need for developing the approach to leadership. Suddenly the challenges in the operations were not only IEDs, ambushes, shootings and deprivation of families, but also leadership challenges in military staffs...

  14. Monitoring of Structures and Mechanical Systems Using Virtual Visual Sensors for Video Analysis: Fundamental Concept and Proof of Feasibility

    Directory of Open Access Journals (Sweden)

    Thomas Schumacher

    2013-12-01

    Full Text Available Structural health monitoring (SHM has become a viable tool to provide owners of structures and mechanical systems with quantitative and objective data for maintenance and repair. Traditionally, discrete contact sensors such as strain gages or accelerometers have been used for SHM. However, distributed remote sensors could be advantageous since they don’t require cabling and can cover an area rather than a limited number of discrete points. Along this line we propose a novel monitoring methodology based on video analysis. By employing commercially available digital cameras combined with efficient signal processing methods we can measure and compute the fundamental frequency of vibration of structural systems. The basic concept is that small changes in the intensity value of a monitored pixel with fixed coordinates caused by the vibration of structures can be captured by employing techniques such as the Fast Fourier Transform (FFT. In this paper we introduce the basic concept and mathematical theory of this proposed so-called virtual visual sensor (VVS, we present a set of initial laboratory experiments to demonstrate the accuracy of this approach, and provide a practical in-service monitoring example of an in-service bridge. Finally, we discuss further work to improve the current methodology.

  15. Analysis of a control and data acquisition system for radiation protection monitors of spent fuel reprocessing plant

    International Nuclear Information System (INIS)

    Liu Boxue

    1997-01-01

    For the radiation protection monitoring of spent nuclear fuel reprocessing plant, the paper analyzes the composition and requirements of a control and data acquisition system. With the concepts of typical distributing and opening models, the hardware consists of IPC, communication of RS-485 bus lines and data multiplexer. The software consists of real-time multi-services operation system and modelling program. It can sample monitoring data, control monitor's operation, and process data and other information. It has good expansive and compatible features

  16. Multidimensional Generalized Functions in Aeroacoustics and Fluid Mechanics. Part 1; Basic Concepts and Operations

    Science.gov (United States)

    Farassat, Fereidoun; Myers, Michael K.

    2011-01-01

    This paper is the first part of a three part tutorial on multidimensional generalized functions (GFs) and their applications in aeroacoustics and fluid mechanics. The subject is highly fascinating and essential in many areas of science and, in particular, wave propagation problems. In this tutorial, we strive to present rigorously and clearly the basic concepts and the tools that are needed to use GFs in applications effectively and with ease. We give many examples to help the readers in understanding the mathematical ideas presented here. The first part of the tutorial is on the basic concepts of GFs. Here we define GFs, their properties and some common operations on them. We define the important concept of generalized differentiation and then give some interesting elementary and advanced examples on Green's functions and wave propagation problems. Here, the analytic power of GFs in applications is demonstrated with ease and elegance. Part 2 of this tutorial is on the diverse applications of generalized derivatives (GDs). Part 3 is on generalized Fourier transformations and some more advanced topics. One goal of writing this tutorial is to convince readers that, because of their powerful operational properties, GFs are absolutely essential and useful in engineering and physics, particularly in aeroacoustics and fluid mechanics.

  17. The ChlorOut concept. A method to reduce alkali-related problems during combustion

    Energy Technology Data Exchange (ETDEWEB)

    Kassman, Haakan [ChlorOut AB c/o Vattenfall AB, Nykoeping (Sweden); Wollner, Lothar [Boehringer Ingelheim Pharma GmbH und Co. KG, Ingelheim am Rhein (Germany); Berg, Magnus [ChlorOut AB c/o Vattenfall AB, Stockholm (Sweden)

    2013-06-01

    Combustion of biomass with a high content of alkali and chlorine (Cl) can result in operational problems including deposit formation and superheater corrosion. The strategies applied to reduce such problems include co-combustion and the use of additives. Ammonium sulphate is a part of the ChlorOut concept which is applied in a range of commercial boilers. This concept is based on dosing of sulphate-containing additives to the flue gases and a unique measurement device for on-line measurement of gaseous alkali chlorides called IACM (in-situ alkali chloride monitor). The focus of the present paper is on evaluation of long-term experiences from two full-scale boilers. The operational problems with deposit formation and superheater corrosion decreased in these boilers after installing the ChlorOut concept. (orig.)

  18. Federal Radiological Monitoring and Assessment Center Overview of FRMAC Operations

    International Nuclear Information System (INIS)

    1998-01-01

    In the event of a major radiological emergency, 17 federal agencies with various statutory responsibilities have agreed to coordinate their efforts at the emergency scene under the umbrella of the Federal Radiological Emergency Response Plan. This cooperative effort will ensure that all federal radiological assistance fully supports their efforts to protect the public. the mandated federal cooperation ensures that each agency can obtain the data critical to its specific responsibilities. This Overview of Federal Radiological Monitoring and Assessment Center (FRMAC) describes the FRMAC response activities to a major radiological emergency. It also describes the federal assets and subsequent operational activities which provide federal radiological monitoring and assessment of the off-site areas

  19. MONITORING DIAGNOSTIC INDICATORS DURING OPERATION OF A PRINT MACHIN

    Directory of Open Access Journals (Sweden)

    Jozef Dobránsky

    2015-11-01

    Full Text Available This article deals with monitoring diagnostic indicators during the operation of a machine used for production of packing materials with a print. It analyses low-frequency vibrations measured in individual spherical roller bearings in eight print positions. The rollers in these positions have a different pressure based on positioning these rollers in relation to the central roller. As a result, the article also deals with a correlation of pressure and level of measured low-frequency vibrations. The speed of the print machine (the speed of a line in meters per minute is a very important variable during its operation, this is why it is important to verify the values of vibrations in various speeds of the line, what can lead to revelation of one or more resonance areas. Moreover, it examines vibrations of the central roller drive and measurement of backlash of transmission cogs of this drive. Based on performed analyses recommendations for an operator of the machine have been conceived.

  20. Integrated architecture of monitoring, supervisory and automatic control for optimization of the operations in the natural gas turbo compressor station at Guamare - state of Rio Grande do Norte - Brazil

    International Nuclear Information System (INIS)

    Nascimento Filho, Epitacio

    2000-01-01

    This paper presents the conception and the benefits of the integrated supervisory control architecture for performance, aero thermodynamic and mechanical monitoring of the Ubarana Phase V Turbo compressor Station in Guamare-Rn. The compression station has four gas turbines, each one developing 6.640 kW ( 9.600 rpm - ISO power), driving four centrifugal compressors, each one with unitary capacity of 850.000 m 3 /d, arranged in parallel. The integrated architecture allows the continuous tele monitoring of a large range of mechanical and process parameters. Other resources are real time identification of deterioration signs or performance decaying of each machine in service, serving as a precious tool for the operation and maintenance decisions like wash application intervals and partial or general equipment revision. Just for the sake of operational cost impacts: a small increase of 1% in overall thermal efficiency represents a reduction of US$ 60,000 in annual operational cost, since the annual fuel consume nears US$ 6 million (considering 20 MW with 8,000 h). (author)

  1. IMAGE information monitoring and applied graphics software environment. Volume 2. Software description

    International Nuclear Information System (INIS)

    Hallam, J.W.; Ng, K.B.; Upham, G.L.

    1986-09-01

    The EPRI Information Monitoring and Applied Graphics Environment (IMAGE) system is designed for 'fast proto-typing' of advanced concepts for computer-aided plant operations tools. It is a flexible software system which can be used for rapidly creating, dynamically driving and evaluating advanced operator aid displays. The software is written to be both host computer and graphic device independent

  2. APPLICATION OF INTERFIRM NETWORKS CONCEPTS IN THE RETAIL SECTION: AN APPLICATION OF THE BROKER CONCEPTS AND OPERATORS LOGISTICS IN DISTRIBUTING COMPANIES OF FOODS

    Directory of Open Access Journals (Sweden)

    Gesinaldo Ataíde Cândido

    2006-06-01

    Full Text Available One of main the practical ones adopted for the organizations in the current environment business-oriented and of management has been the application of the principles of nets, based in the concepts of the partnership, the association and the co-operation. The experiences of this new type of practical of management have been successful in diverse economic sectors, creating better conditions for the attainment of competitive advantages. In this work, a study is made to see the possibility of application in the sector of food distribution, inside of the new perspectives of the supply management and the logistic one. In this direction, the work makes a diagnosis of the retail sector, verifying the possibilities of the application of the principles of nets in a together operating company to the representation sector and food distribution, from a process of strategic change, considering a management model based in the concepts of brokers and logistic operator, which they substitute and/or they incorporate the diverse involved agents with the food distribution, which are: the commercial representative, the deliverer and the wholesaler. Key words: competitiveness, network organizational, chain of supply.

  3. Steady-state operation requirements of tokamak fusion reactor concepts

    International Nuclear Information System (INIS)

    Knobloch, A.F.

    1991-06-01

    In the last two decades tokamak conceptual reactor design studies have been deriving benefit from progressing plasma physics experiments, more depth in theory and increasing detail in technology and engineering. Recent full-scale reactor extrapolations such as the US ARIES-I and the EC Reference Reactor study provide information on rather advanced concepts that are called for when economic boundary conditions are imposed. The ITER international reactor design activity concentrated on defining the next step after the JET generation of experiments. For steady-state operation as required for any future commercial tokamak fusion power plants it is essential to have non-inductive current drive. The current drive power and other internal power requirements specific to magnetic confinement fusion have to be kept as low as possible in order to attain a competitive overall power conversion efficiency. A high plasma Q is primarily dependent on a high current drive efficiency. Since such conditions have not yet been attained in practice, the present situation and the degree of further development required are characterized. Such development and an appropriately designed next-step tokamak reactor make the gradual realization of high-Q operation appear feasible. (orig.)

  4. Minimal-Intrusion Traffic Monitoring And Analysis In Mission-Critical Communication Networks

    Directory of Open Access Journals (Sweden)

    Alberto Domingo Ajenjo

    2003-10-01

    Full Text Available A good knowledge of expected and actual traffic patterns is an essential tool for network planning, design and operation in deployed, mission-critical applications. This paper describes those needs, and explains the Traffic Monitoring and Analysis Platform (TMAP concept, as developed in support of NATO deployed military headquarters Communications and Information Systems. It shows how a TMAP was deployed to a real NATO exercise, to prove the concept and baseline the traffic needs per application, per user community and per time of day. Then, it analyses the obtained results and derives conclusions on how to integrate traffic monitoring and analysis platforms in future deployments.

  5. Dealing with distributed intelligence in monitoring and control systems

    International Nuclear Information System (INIS)

    McLaren, R.A.

    1981-01-01

    The Euorpean Hybrid Spectrometer is built up of many individual detectors, each having widely varying monitoring and control requirements. With the advent of cheap microprocessor systems a shift from the concept of a single monitoring and control computer of that of distributed intelligent controllers has been economically feasible. A detector designer can now thoroughly test and debug a complete monitoring and control system on a local, dedicated micro-computer, while during operation, the central computer can be relieved of many simple repetitive tasks. Rapidly, however, it has become obvious that the designers of these systems have to take into account the final operational environment and build into both the hardware and software, features allowing easy integration into a central monitoring and control chain. In addition, the problems of maintenance and enventual modification have to be taken into consideration early in the development. Examples of currently operational systems will be briefly described to demonstrate how a set of basic guidelines plus standardisation of hardware/software can minimise the problems of integration and maintenance. Based on practical experience gained in the European Hybrid Spectrometer, investigations are proceeding on various possible alternatives for future micro-computer based monitoring and control systems. (orig.)

  6. Process control plan for Single Shell Tank (SST) Saltcake Dissolution Proof of Concept

    International Nuclear Information System (INIS)

    ESTEY, S.D.

    2001-01-01

    This document describes the process controls for the tank 241-U-107 (U-107) saltcake dissolution proof-of-concept operations. Saltcake dissolution is defined as a method by which water-soluble salts will be retrieved from the Hanford Site radioactive waste tanks utilizing dissolution as the mobilizing mechanism. The proof-of-concept operations will monitor the retrieval process and transfer at least 100 kgal of fluid from tank U-107 to the double-shell tank (DST) system during the performance period. Tank U-107 has been identified as posing the highest long-term risk to the Columbia River of all single shell tanks (SSTs). This is because of the high content of mobile, long-lived radionuclides mostly in the saltcake waste in the tank. To meet current contractual and consent decree commitments, tank U-107 is being prepared for interim stabilization in August 2001. It is currently scheduled for saltcake retrieval in 2023, near the end of the SST retrieval campaign because of a lack of infrastructure in U-Farm. The proof-of-concept test will install a system to dissolve and retrieve a portion of the saltcake as part of, and operating in parallel with, the standard interim stabilization system to be installed on tank U-107. This proof-of-concept should provide key information on spray nozzle selection and effective spray patterns, leak detection, monitoring, and mitigation (LDMM) and in-tank saltcake solubility data that will help in the design of a full-tank retrieval demonstration system

  7. Development and Evaluation of Sensor Concepts for Ageless Aerospace Vehicles: Report 6 - Development and Demonstration of a Self-Organizing Diagnostic System for Structural Health Monitoring

    Science.gov (United States)

    Batten, Adam; Edwards, Graeme; Gerasimov, Vadim; Hoschke, Nigel; Isaacs, Peter; Lewis, Chris; Moore, Richard; Oppolzer, Florien; Price, Don; Prokopenko, Mikhail; hide

    2010-01-01

    This report describes a significant advance in the capability of the CSIRO/NASA structural health monitoring Concept Demonstrator (CD). The main thrust of the work has been the development of a mobile robotic agent, and the hardware and software modifications and developments required to enable the demonstrator to operate as a single, self-organizing, multi-agent system. This single-robot system is seen as the forerunner of a system in which larger numbers of small robots perform inspection and repair tasks cooperatively, by self-organization. While the goal of demonstrating self-organized damage diagnosis was not fully achieved in the time available, much of the work required for the final element that enables the robot to point the video camera and transmit an image has been completed. A demonstration video of the CD and robotic systems operating will be made and forwarded to NASA.

  8. Morsleben repository for radioactive waste (ERAM). Operational safety, radiation protection and environmental monitoring. Release: December 2009

    International Nuclear Information System (INIS)

    2010-01-01

    The report overviews the monitoring activities of the Federal Office for Radiation Protection at the Morsleben repository for radioactive waste (ERAM), focussing the ERAM inventory of radioactive waste and the measures and results of geomechanical and hydrogeological monitoring, operational radiation protection, the monitoring of discharges of radioactive substances, environmental monitoring, and the dose levels expected from discharges of radioactive substances. (orig.)

  9. 5. symposium on nuclear reactor remote monitoring

    International Nuclear Information System (INIS)

    1987-01-01

    17 papers deal with the data-technological concept and mode of operation of nuclear-reactor remote-monitoring (RM) systems from the perspectives of users in Baden-Wurttemberg, Sleswig-Holstein, Bavaria and Belgium, with the requirements on measuring devices and equipment in NRM systems, computer-controlled evaluation and processing of measured data, in particular the LASAT and OLDES systems. (DG) [de

  10. ATLAS trigger operations: Monitoring with “Xmon” rate prediction system

    CERN Document Server

    Aukerman, Andrew Todd; The ATLAS collaboration

    2017-01-01

    We present the operations and online monitoring with the “Xmon” rate prediction system for the trigger system at the ATLAS Experiment. A two-level trigger system reduces the LHC’s bunch-crossing rate, 40 MHz at design capacity, to an average recording rate of about 1 kHz, while maintaining a high efficiency of selecting events of interest. The Xmon system uses the luminosity value to predict trigger rates that are, in turn, compared with incoming rates. The predictions rely on past runs to parameterize the luminosity dependency of the event rate for a trigger algorithm. Some examples are given to illustrate the performance of the tool during recent operations.

  11. Development of an X Window based operator's interface for a core monitoring system

    International Nuclear Information System (INIS)

    Vegh, J.; Huszar, J.; Laz, J.

    1992-09-01

    The components, functioning and programming concepts of the man-machine interface applied in an upgraded version of the core monitoring system and reactor information system VERONA for WWER-440 type nuclear power reactors, installed at the Paks Nuclear Power Plant, are described. The application of the X Window standard Graphical User Interface facilitated modular interface design and made program development easier and faster. (author) 3 refs.; 13 figs

  12. The concept of presence in group psychotherapy: an operational definition.

    Science.gov (United States)

    Crane-Okada, Rebecca

    2012-07-01

    The paper aims to operationally define the concept of presence, as developed and exhibited by the therapist leading a psychotherapy group, and illustrated with case examples. A group therapist, who addresses tangible, basic group survival needs, while integrating knowledge of psychotherapeutic processes, authentic and effective interpersonal communications, and genuine concern for individual members and the group as a whole, is best situated to enact presence in the context of group psychotherapy. Establishing presence can be achieved in a systematic way with an understanding of the meaning of being present at each step in the development of the group psychotherapeutic process. © 2011 Wiley Periodicals, Inc.

  13. Inter-utility operating data exchange concepts, standards and implementation considerations

    International Nuclear Information System (INIS)

    Virmani, S.; Leichner, G.H.

    1991-01-01

    Operating a modern interconnected electric utility in a secure and reliable manner requires a knowledge of the state of critical elements of the outside or external network. As noted in reference 1: In this paper, the authors focus on considerations in the implementation of communication processors which can be used as front ends to an EMS in order to accomplish data exchange in a multiple EMS vendor, multiple computer environment. Before discussing the implementation aspects, the paper also discusses the basic data exchange concepts in terms of the Open System Interconnection (OSI) seven layer model and the standards that are in existence or are emerging for inter-utility data exchange

  14. Developing a Comprehensive Model of Intensive Care Unit Processes: Concept of Operations.

    Science.gov (United States)

    Romig, Mark; Tropello, Steven P; Dwyer, Cindy; Wyskiel, Rhonda M; Ravitz, Alan; Benson, John; Gropper, Michael A; Pronovost, Peter J; Sapirstein, Adam

    2015-04-23

    This study aimed to use a systems engineering approach to improve performance and stakeholder engagement in the intensive care unit to reduce several different patient harms. We developed a conceptual framework or concept of operations (ConOps) to analyze different types of harm that included 4 steps as follows: risk assessment, appropriate therapies, monitoring and feedback, as well as patient and family communications. This framework used a transdisciplinary approach to inventory the tasks and work flows required to eliminate 7 common types of harm experienced by patients in the intensive care unit. The inventory gathered both implicit and explicit information about how the system works or should work and converted the information into a detailed specification that clinicians could understand and use. Using the ConOps document, we created highly detailed work flow models to reduce harm and offer an example of its application to deep venous thrombosis. In the deep venous thrombosis model, we identified tasks that were synergistic across different types of harm. We will use a system of systems approach to integrate the variety of subsystems and coordinate processes across multiple types of harm to reduce the duplication of tasks. Through this process, we expect to improve efficiency and demonstrate synergistic interactions that ultimately can be applied across the spectrum of potential patient harms and patient locations. Engineering health care to be highly reliable will first require an understanding of the processes and work flows that comprise patient care. The ConOps strategy provided a framework for building complex systems to reduce patient harm.

  15. An artificial intelligence approach to onboard fault monitoring and diagnosis for aircraft applications

    Science.gov (United States)

    Schutte, P. C.; Abbott, K. H.

    1986-01-01

    Real-time onboard fault monitoring and diagnosis for aircraft applications, whether performed by the human pilot or by automation, presents many difficult problems. Quick response to failures may be critical, the pilot often must compensate for the failure while diagnosing it, his information about the state of the aircraft is often incomplete, and the behavior of the aircraft changes as the effect of the failure propagates through the system. A research effort was initiated to identify guidelines for automation of onboard fault monitoring and diagnosis and associated crew interfaces. The effort began by determining the flight crew's information requirements for fault monitoring and diagnosis and the various reasoning strategies they use. Based on this information, a conceptual architecture was developed for the fault monitoring and diagnosis process. This architecture represents an approach and a framework which, once incorporated with the necessary detail and knowledge, can be a fully operational fault monitoring and diagnosis system, as well as providing the basis for comparison of this approach to other fault monitoring and diagnosis concepts. The architecture encompasses all aspects of the aircraft's operation, including navigation, guidance and controls, and subsystem status. The portion of the architecture that encompasses subsystem monitoring and diagnosis was implemented for an aircraft turbofan engine to explore and demonstrate the AI concepts involved. This paper describes the architecture and the implementation for the engine subsystem.

  16. Commissioning and operational scenarios of the LHC beam loss monitor system

    International Nuclear Information System (INIS)

    Holzer, E.B.

    2007-01-01

    One of the most critical elements for the protection of CERN's Large Hadron Collider (LHC) is its beam loss monitoring (BLM) system. It must prevent quenches in the super conducting magnets and damage of machine components due to beam losses. The contribution will discuss the commissioning procedures of the BLM system and envisaged operational scenarios. About 4000 monitors will be installed around the ring. When the loss rate exceeds a predefined threshold value, a beam abort is requested. Magnet quench and damage levels vary as a function of beam energy and loss duration. Consequently, the beam abort threshold values vary accordingly. By measuring the loss pattern, the BLM system helps to identify the loss mechanism. Furthermore, it will be an important tool for commissioning, machine setup and studies. Special monitors will be used for the setup and control of the collimators. (author)

  17. Development concepts of a Smart Cyber Operating Theater (SCOT) using ORiN technology.

    Science.gov (United States)

    Okamoto, Jun; Masamune, Ken; Iseki, Hiroshi; Muragaki, Yoshihiro

    2018-02-23

    Currently, networking has not progressed in the treatment room. Almost every medical device in the treatment room operates as a stand-alone device. In this project, we aim to develop a networked operating room called "Smart Cyber Operating Theater (SCOT)". Medical devices are connected using Open Resource interface for the Network (ORiN) technology. In this paper, we describe the concept of the SCOT project. SCOT is integrated using the communication interface ORiN, which was originally developed for industry. One feature of ORiN is that the system can be constructed flexibly. ORiN creates abstracts of the same type of devices and increases the robustness of the system for device exchange. By using ORiN technology, we are developing new applications, such as decision-making navigation or a precision guided treatment system.

  18. Operational monitoring of acoustic sensor networks

    Directory of Open Access Journals (Sweden)

    Boltenkov V.A.

    2015-06-01

    Full Text Available Acoustic sensor networks (ASN are widely used to monitor water leaks in the power generating systems. Since the ASN are used in harsh climatic conditions the failures of microphone elements of ASN are inevitable. That's why the failure detection of ASN elements is a problem of current interest. Two techniques of operational monitoring ASN are developed. Both of them are based on the placement of the test sound source within a network. The signal processing for ASN sensors had to detect the failed element. Techniques are based time difference of arrival (TDOA estimating at the each pair of ASN elements. TDOA estimates as argmaximum of cross-correlation function (CCF for signals on each microphone sensors pair. The M-sequence phase-shift keyed signal is applied as a test acoustic signal to ensure high accuracy of the CCF maximum estimation at low signal/noise ratio (SNR. The first technique is based on the isolation principle for TDOA sum at three points. It require to locate the test sound source in the far field. This is not always possible due to technological reasons. For the second proposed technique test sound source can be located near the ASN. It is based on a system of hyperbolic equations solving for each of the four elements of the ASN. Both techniques has been tested in the computer imitation experiment. It was found that for the SNR to –5 dB both techniques show unmistakable indicators of control quality. The second method requires significantly more time control.

  19. Supply Warehouse#3, SWMU 088 Operations, Maintenance, and Monitoring Report Kennedy Space Center, Florida

    Science.gov (United States)

    Murphy, Alex

    2016-01-01

    This document presents the findings, observations, and results associated with Operations, Maintenance, and Monitoring (OM&M) activities of Corrective Measures Implementation (CMI) activities conducted at Supply Warehouse #3 (SW3) located at John F. Kennedy Space Center (KSC), Florida from October 8, 2015, to September 12, 2016, and performance monitoring results for semi-annual sampling events conducted in March and September 2016. The primary objective of SW3 CMI is to actively decrease concentrations of trichloroethene (TCE) and vinyl chloride (VC) to less than Florida Department of Environmental Protection (FDEP) Natural Attenuation Default Concentrations (NADCs), and the secondary objective is to reduce TCE, cis-1,2-dichloroethene (cDCE), trans-1,2-dichloroethene (tDCE), 1,1-dichloroethene (11DCE), and VC concentrations to less than FDEP Groundwater Cleanup Target Levels (GCTLs). The SW3 facility has been designated Solid Waste Management Unit (SWMU) 088 under KSC's Resource Conservation and Recovery Act (RCRA) Corrective Action Program. Based on the results to date, the SW3 air sparging (AS) system is operating at or below the performance criteria as presented in the 2008 SW3 Corrective Measures Implementation (CMI) Work Plan and 2009 and 2012 CMI Work Plan Addenda. Since the start of AS system operations on December 19, 2012, through the September 2016 groundwater sampling event, TCE concentrations have decreased to less than the GCTL in all wells within the Active Remediation Zone (ARZ), and VC results remain less than NADC but greater than GCTL. Based on these results, team consensus was reached at the October 2016 KSC Remediation Team (KSCRT) meeting to continue AS system operations and semi-annual performance monitoring of volatile organic compounds in March 2017 at ten monitoring wells at select locations, and in September 2017 at four monitoring wells at select locations to reduce VC concentrations to below GCTL. Additionally, surface water samples

  20. Processing methods for operation test data of radioactive aerosols monitor based on accumulation techniques

    International Nuclear Information System (INIS)

    Fu Cuiming; Xi Pingping; Ma Yinghao; Tan Linglong; Shen Fu

    2011-01-01

    This article introduces a radioactive aerosol continuous monitor based on accumulation sampling and measuring and three methods for processing the operation data. The monitoring results are processed by the 3 methods which are applied both under the conditions of natural background and at workplaces of a nuclear facility. How the monitoring results are assessed and how to calculate the detection limit when using the 3 different methods are explained. Moreover, the advantages and disadvantages of the 3 methods are discussed. (authors)

  1. Radioactivity, radiation protection and monitoring during dismantling of light-water reactors

    International Nuclear Information System (INIS)

    Hummel, L.; Zech, J.B.

    2005-01-01

    Based on the radioactivity inventory in the systems and components of light-water reactors observed during operation, the impact of actions during plant emptying after the conclusion of power operation and possible subsequent long-term safe enclosure concerning the composition of the nuclide inventory of the plant to be dismantled will be described. Derived from this will be the effects on radioactivity monitoring in the plant, physical radiation protection monitoring, and the measured characterization of the residual materials resulting from the dismantling. The impact of long-term interim storage will also be addressed in the discussion. The talk should provide an overview of the interrelationships between source terms, decay times and the radioactivity monitoring requirements of the various dismantling concepts for commercial light-water reactors. (orig.)

  2. Integrating UF6 Cylinder RF Tracking With Continuous Load Cell Monitoring for Verifying Declared UF6 Feed and Withdrawal Operations Verifying Declared UF6 Feed and Withdrawal Operations

    International Nuclear Information System (INIS)

    Krichinsky, Alan M.; Miller, Paul; Pickett, Chris A.; Richardson, Dave; Rowe, Nathan C.; Whitaker, J. Michael; Younkin, James R.

    2009-01-01

    Oak Ridge National Laboratory is demonstrating the integration of UF6 cylinder tracking, using RF technology, with continuous load cell monitoring (CLCM) at mock UF6 feed and withdrawal (F and W) stations. CLCM and cylinder tracking are two of several continuous-monitoring technologies that show promise in providing integrated safeguards of F and W operations at enrichment plants. Integrating different monitoring technologies allows advanced, automated event processing to screen innocuous events thereby minimizing false alerts to independent inspectors. Traditionally, international inspectors rely on batch verification of material inputs and outputs derived from operator declarations and periodic on-site inspections at uranium enrichment plants or other nuclear processing facilities. Continuously monitoring F and W activities between inspections while providing filtered alerts of significant operational events will substantially increase the amount of valuable information available to inspectors thereby promising to enhance the effectiveness of safeguards and to improve efficiency in conducting on-site inspections especially at large plants for ensuring that all operations are declared.

  3. A new concept of safety parameter display system

    International Nuclear Information System (INIS)

    Martinez, A.S.; Oliveira, L.F.S. de; Schirru, R.; Thome Filho, Z.D.; Silva, R.A. da.

    1986-07-01

    A general description of Angra-1 Parameter Display System (SSPA), a real time and on-line computerized monitoring system for the parameters related to the power plant safety is presented. This system has the main purpose of diminish the load on the Angra-1 power plant operators at an emergency event by supplying them with the additional tools serving as the basis for a prompt identification of the accident. The SSPA is a kind of safety parameter display system whose concept was introduced after Three Mile Island accident in USA. The SSPA comprises two nuclear applications independently considered. They are included into the Parameters Monitoring Integrated System (SIMP) and the safety critical function system (SFCS). (Author) [pt

  4. Structural Health Monitoring under Nonlinear Environmental or Operational Influences

    Directory of Open Access Journals (Sweden)

    Jyrki Kullaa

    2014-01-01

    Full Text Available Vibration-based structural health monitoring is based on detecting changes in the dynamic characteristics of the structure. It is well known that environmental or operational variations can also have an influence on the vibration properties. If these effects are not taken into account, they can result in false indications of damage. If the environmental or operational variations cause nonlinear effects, they can be compensated using a Gaussian mixture model (GMM without the measurement of the underlying variables. The number of Gaussian components can also be estimated. For the local linear components, minimum mean square error (MMSE estimation is applied to eliminate the environmental or operational influences. Damage is detected from the residuals after applying principal component analysis (PCA. Control charts are used for novelty detection. The proposed approach is validated using simulated data and the identified lowest natural frequencies of the Z24 Bridge under temperature variation. Nonlinear models are most effective if the data dimensionality is low. On the other hand, linear models often outperform nonlinear models for high-dimensional data.

  5. Monitored retrievable storage concept: a review of its status and analysis of its impact on the waste management system

    International Nuclear Information System (INIS)

    The concept of monitored retrievable storage (MRS) for commercial spent fuel elements and high-level waste is based on using a high-integrity canister and a structure of some type to protect the canister from natural or man-caused events. Cooling is by means of a passive method. Seven concepts are described (dry well, casks, tunnel). The feasibility of demonstation MRS facilities is studied in this report. Two prospective sites are considered at Hanford and Nevada Test Site, and capital cost estimates were made

  6. Modern Project: monitoring developments for safe repository operation and staged closure

    International Nuclear Information System (INIS)

    Mayer, S.; Ouchhi, S.; Verstricht, J.; Maurer, H.; Breen, B.

    2010-01-01

    Document available in extended abstract form only. In a first part, the overall objectives of the MoDeRn project (Monitoring Developments for safe Repository operation and stage closure project) are presented. MoDeRn is a four year (2009-2013) collaborative project co-funded under the 7. Framework Program for Nuclear Research and Training (EURATOM). It involves 17 organizations responsible for research into radioactive waste management in the European Union, United States, Japan and Switzerland, with partners with extensive experience in monitoring activities in underground research laboratories (URL); as well as research institutes and universities with substantial experience in research on socio-technical interactions and public and stakeholder engagement. An overview of the project work packages and of their interdependencies is given. The successful implementation of a repository program for radioactive waste relies on both the technical aspects of a sound safety strategy and scientific and engineering excellence as well as on social aspects such as stakeholder acceptance and confidence. Monitoring is considered key in serving both technical and social objectives. It is not only essential to underpin the technical safety strategy and quality of the engineering, but it can also be an important tool for public communication, contributing to public understanding of and confidence in the repository behaviour. By inclusion of specific national contexts of waste management programs in different countries, the MoDeRn project aims at providing a reference framework for development and implementation of monitoring activities. This will be achieved by stakeholder engagement during all identifiable phases of the radioactive waste disposal process. Thus, site characterisation, construction, operation and staged closure, as well as post-closure institutional control phases have to be addressed. MoDeRn considers different host rock types, such as salt, tuff, crystalline rock

  7. The complex system of environmental monitoring (CSEM). An analysis of concept

    Science.gov (United States)

    Kazatsev, Yury I.; Mitchenkov, Igor G.

    2018-01-01

    Researches of ecological processes in Russia testify to rather difficult and adverse situation. It is quite obviously that we need a reasonable concept of an exit from the situation. It could become the strategic program for the solution of ecological tasks at the same time. In this regard, it is obviously necessary not just to develop new scientific and technological mechanisms to overcome of critical situations, but to offer a new research platform which will be able to give ideas to predict tendencies of ecological development and to analyses the consequences of their embodiment. Our offer for it is “the composite system of environmental monitoring” (CSEM) of the territory or region. We use a method of the conceptual analysis. Also, we will try to show how definition of the term influences to contents of social practicing, namely, environmental monitoring of the region.

  8. An Assessment of Civil Tiltrotor Concept of Operations in the Next Generation Air Transportation System

    Science.gov (United States)

    Chung, William W.; Salvano, Dan; Rinehart, David; Young, Ray; Cheng, Victor; Lindsey, James

    2012-01-01

    Based on a previous Civil Tiltrotor (CTR) National Airspace System (NAS) performance analysis study, CTR operations were evaluated over selected routes and terminal airspace configurations assuming noninterference operations (NIO) and runway-independent operations (RIO). This assessment aims to further identify issues associated with these concepts of operations (ConOps), and their dependency on the airspace configuration and interaction with conventional fixed-wing traffic. Safety analysis following a traditional Safety Management System (SMS) methodology was applied to CTR-unique departure and arrival failures in the selected airspace to identify any operational and certification issues. Additional CTR operational cases were then developed to get a broader understanding of issues and gaps that will need to be addressed in future CTR operational studies. Finally, needed enhancements to National Airspace System performance analysis tools were reviewed, and recommendations were made on improvements in these tools that are likely to be required to support future progress toward CTR fleet operations in the Next Generation Air Transportation System (NextGen).

  9. Evaluation of the RSG-GAS Alpha-Beta Aerosol Contaminant Monitor Performance Under Reactor Operation Condition

    International Nuclear Information System (INIS)

    Hartoyo, Unggul; Setiawanto, Anto; Sumarno, Yulius

    2000-01-01

    Analysis to evaluate the RSG-GAS alpha-beta aerosol contaminant monitor performance was done. The high potential radiation working area such as in RSG-GAS is important to monitored for personal safety. Further it is necessary to assure that the system monitor is reliable enough under normal conditions as well as emergency condition. The method uses in this analysis are monitoring and comparing with the standard source. The standard course indicator and panel in main control room indicate that the result is 1 x 110 exp 9 Ci/m exp 3. Based on data monitor observation, the RSG-GAS alpha-beta aerosol contaminant monitor system under reactor operation condition has a good enough performance

  10. Standard Hydrogen Monitoring System-C operation and maintenance manual

    International Nuclear Information System (INIS)

    Schneider, T.C.

    1997-01-01

    The primary function of the SHMS-C is to monitor specifically for hydrogen in the waste tank vapor space which may also contain (but not be limited to) unknown quantities of air, nitrous oxide (N 2 O), ammonia (NH 3 ), water vapor, carbon dioxide (CO 2 ), carbon monoxide (CO) and other gaseous constituents. An electronically controlled grab sampler has replaced the manually operated sample system that was used in the original SHMS enclosure. Samples can now be operator or automatically initiated. Automatic initiation occurs based on the high hydrogen alarm level. Once a sample is obtained it is removed from the sampler and transported to a laboratory for analysis. This system is used to identify other gaseous constituents which are not measured by the hydrogen monitor. The design does not include any remote data acquisition or remote data logging equipment but provides a 4--20 mA dc process signals, and discrete alarm contacts, that can be utilized for remote data logging and alarming when desired. The SHMS-C arrangement consists of design modifications (piping, valves, filters, supports) to the SHMS-B arrangement necessary for the installation of a dual column gas chromatograph and associated sample and calibration gas lines. The gas chromatograph will provide real time, analytical quality, specific hydrogen measurements in low and medium range concentrations. The system is designed to sample process gases that are classified by NEC code as Class 1, Division 1, Group B

  11. ECOLOGICAL LIFESTYLE, THE BASIC PRINCIPLES OF THE OPERATIONAL DEFINITION OF THE CONCEPT

    Directory of Open Access Journals (Sweden)

    Olesya Nikolaevna Tarasova

    2015-12-01

    Full Text Available Based on the analysis of approaches to the empirical study of the environmental aspects of lifestyle are presented the basic principles that distinguish ecological way of life off the set of environmental practices that need to be taken into account in empirical measurement, namely: systematicity, conceptuality, contextual conformity and processuality. The article provides a theoretical basis and operational definition as an ecological way of life in general and the principles that distinguish it from other concepts of environmental sociology.

  12. Connected Vehicle Pilot Deployment Program phase 1 : security management operating concept : New York City : final report.

    Science.gov (United States)

    2016-05-18

    This document describes the Security Management Operating Concept (SMOC) for the New York City Department of Transportation (NYCDOT) Connected Vehicle Pilot Deployment (CVPD) Project. This SMOC outlines the security mechanisms that will be used to pr...

  13. Vibration energy harvesting based monitoring of an operational bridge undergoing forced vibration and train passage

    Science.gov (United States)

    Cahill, Paul; Hazra, Budhaditya; Karoumi, Raid; Mathewson, Alan; Pakrashi, Vikram

    2018-06-01

    The application of energy harvesting technology for monitoring civil infrastructure is a bourgeoning topic of interest. The ability of kinetic energy harvesters to scavenge ambient vibration energy can be useful for large civil infrastructure under operational conditions, particularly for bridge structures. The experimental integration of such harvesters with full scale structures and the subsequent use of the harvested energy directly for the purposes of structural health monitoring shows promise. This paper presents the first experimental deployment of piezoelectric vibration energy harvesting devices for monitoring a full-scale bridge undergoing forced dynamic vibrations under operational conditions using energy harvesting signatures against time. The calibration of the harvesters is presented, along with details of the host bridge structure and the dynamic assessment procedures. The measured responses of the harvesters from the tests are presented and the use the harvesters for the purposes of structural health monitoring (SHM) is investigated using empirical mode decomposition analysis, following a bespoke data cleaning approach. Finally, the use of sequential Karhunen Loeve transforms to detect train passages during the dynamic assessment is presented. This study is expected to further develop interest in energy-harvesting based monitoring of large infrastructure for both research and commercial purposes.

  14. Trend Monitoring System (TMS) graphics software

    Science.gov (United States)

    Brown, J. S.

    1979-01-01

    A prototype bus communications systems, which is being used to support the Trend Monitoring System (TMS) and to evaluate the bus concept is considered. A set of FORTRAN-callable graphics subroutines for the host MODCOMP comuter, and an approach to splitting graphics work between the host and the system's intelligent graphics terminals are described. The graphics software in the MODCOMP and the operating software package written for the graphics terminals are included.

  15. Role of ultrasonography in infertility management : ovulation monitoring and assisted conception

    International Nuclear Information System (INIS)

    Haq, I.U.; Manzur, S.; Rehman, A.U.; Farooq, A.

    2010-01-01

    Infertility causes great stress to many couples. Most of those presenting with childlessness have reduced fertility, rather than absolute sterility, and many are likely to conceive spontaneously. In this 'ultrasonographic monitoring of growing follicles, in ovaries to determine the day of ovulation and its coordination with time of intercourse' has a well established role in the management of 'unexplained infertility'. This study was conducted to find out its efficacy in our setup. 86 female.s patients of unexplained infertility, with different post-marital time period, underwent ultrasonographic ovulation monitoring each with follow up for minimum of four menstrual cycles. Average follicular growth rate was 2 mm a day, which increased to 3 mm a day, two days prior to ovulation. Follicular diameter at the time of ovulation ranged from 22 mm to 27 mm with a mean of 24 mm. We observed ovulation in 79.2% of our patients. In 8.1% patient.s dominant follicle ceased to grow beyond 18 mm size and gradually become atretic. Leutinized un ruptured follicle was documented in 12.7% of our patients in whom follicular size reached to periovulatory range but did not rupture. Uterine endometrial thickness at the time of ovulation varied from 7 mm to 13 mm and multilayered appearance (triple line sign) was observed in 57.3% of patients. Overall conception rate was 16.3% whereas it was much more encouraging to see in 23.5% of patients who were in less than 5 years of their marriage. Keeping in view of easy to workup as out patient basis in large numbers of patient, less time consuming, promising results, cost effectiveness and non invasive nature of technique; ultrasonographic monitoring of ovulation is recommended as a part of management in all patients of unexplained infertility. (author)

  16. Operational test procedure for pumping and instrumentation control skid SALW-6001B monitor and control system

    International Nuclear Information System (INIS)

    Garcia, M.F.

    1995-11-01

    This OTP shall verify and document that the monitor and control system comprised of PICS SALW-6001B PLC, 242S PLC, Operator Control Station, and communication network is functioning per operational requirements

  17. A logic flowgraph-based concept for decision support and management of nuclear plant operation

    International Nuclear Information System (INIS)

    Guarro, S.B.

    1988-01-01

    The architecture of an automated decision support system for nuclear plant operators is presented and discussed. The system is based on the use of 'logic flowgraph' process models and is designed in a hierarchical fashion. Its functionality spans from 'function oriented' plant status and alternative success path information displayed to the plant operators at its higher access levels to 'process oriented' diagnostic and recovery information deduced and displayed at its lowest. The design basis for this architecture is the 'defense in depth' plant safety concept. The decision support system goal is to provide plant operators, in the presence of an unforeseen transient, with the best and safest alternative between plant stabilization after shutdown and recovery of normal operation based on early diagnosis. Examples of the system capability to interpret and diagnose abnormal plant conditions and of the information that it can supply to the operators at its three access levels are presented and discussed. (author)

  18. The marine environment monitoring in Saco Piraquara de Fora after the beginning of the Angra 2 nuclear power plant operation

    International Nuclear Information System (INIS)

    Tavares, P.G.; Souza, R.F.; Cardoso, S.N.M.

    2009-01-01

    The goal of this paper is to evaluate the environmental monitoring around the Almirante Alvaro Alberto Nuclear Power Station after the beginning the operation of Unit II, in July 2000. The Environmental Monitoring Laboratory collects several environmental samples and analyses them radiometrically to determine the presence of artificial radionuclides. In the Environmental Monitoring Laboratory, the samples are prepared and analysed following international procedures and the activities of the detectable radionuclides are obtained by gamma spectrometry. The Environmental Monitoring Laboratory analyses tritium in sea water as well. This paper will describe only the monitoring of the marine samples and the results of the measurements are compared with those obtained in pre-operational time of Angra 1 (1978 - 1982), Angra 2 (1996 - 2000) and those obtained in operational time of the units until 2008. The results show that, since 1982 until now, there is no impact on marine environment caused by the operation of Angra 1 and Angra 2. (author)

  19. Integrating SAR with Optical and Thermal Remote Sensing for Operational Near Real-Time Volcano Monitoring

    Science.gov (United States)

    Meyer, F. J.; Webley, P.; Dehn, J.; Arko, S. A.; McAlpin, D. B.

    2013-12-01

    Volcanic eruptions are among the most significant hazards to human society, capable of triggering natural disasters on regional to global scales. In the last decade, remote sensing techniques have become established in operational forecasting, monitoring, and managing of volcanic hazards. Monitoring organizations, like the Alaska Volcano Observatory (AVO), are nowadays heavily relying on remote sensing data from a variety of optical and thermal sensors to provide time-critical hazard information. Despite the high utilization of these remote sensing data to detect and monitor volcanic eruptions, the presence of clouds and a dependence on solar illumination often limit their impact on decision making processes. Synthetic Aperture Radar (SAR) systems are widely believed to be superior to optical sensors in operational monitoring situations, due to the weather and illumination independence of their observations and the sensitivity of SAR to surface changes and deformation. Despite these benefits, the contributions of SAR to operational volcano monitoring have been limited in the past due to (1) high SAR data costs, (2) traditionally long data processing times, and (3) the low temporal sampling frequencies inherent to most SAR systems. In this study, we present improved data access, data processing, and data integration techniques that mitigate some of the above mentioned limitations and allow, for the first time, a meaningful integration of SAR into operational volcano monitoring systems. We will introduce a new database interface that was developed in cooperation with the Alaska Satellite Facility (ASF) and allows for rapid and seamless data access to all of ASF's SAR data holdings. We will also present processing techniques that improve the temporal frequency with which hazard-related products can be produced. These techniques take advantage of modern signal processing technology as well as new radiometric normalization schemes, both enabling the combination of

  20. Concept of voltage and frequency monitoring for a nuclear power plant normal power supply system - PWR 1300 MWe

    International Nuclear Information System (INIS)

    Andrade, R.B. de

    1990-01-01

    Voltage and frequency monitoring concept for a Nuclear Power Plant Normal Power Supply System (PWR 1300 MWe) is described based on the phylosophy adopted for Angra 2 and e NPP's. Some suggested setpoints are only guidance values and can be modified during plant commissioning for a better performance of the whole protection system. (author) [pt

  1. A COMPUTERIZED OPERATOR SUPPORT SYSTEM PROTOTYPE

    Energy Technology Data Exchange (ETDEWEB)

    Thomas A. Ulrich; Roger Lew; Ronald L. Boring; Ken Thomas

    2015-03-01

    A computerized operator support system (COSS) is proposed for use in nuclear power plants to assist control room operators in addressing time-critical plant upsets. A COSS is a collection of technologies to assist operators in monitoring overall plant performance and making timely, informed decisions on appropriate control actions for the projected plant condition. A prototype COSS was developed in order to demonstrate the concept and provide a test bed for further research. The prototype is based on four underlying elements consisting of a digital alarm system, computer-based procedures, piping and instrumentation diagram system representations, and a recommender module for mitigation actions. The initial version of the prototype is now operational at the Idaho National Laboratory using the Human System Simulation Laboratory.

  2. Monitoring of the release of gaseous and aerosol-bound radioactive materials. Pt. 2

    International Nuclear Information System (INIS)

    1992-01-01

    KTA 1503 contains requirements on technical installations and supplementary organizational measures considered necessary in order to monitor the release of gaseous and aerosol-bound radioactive materials. It consists of part 1: Monitoring of the release of radioactive materials together with stack gas during normal operation; part 2: Monitoring of the release of radioactive materials together with stack gas in the event of incidents; part 3: Monitoring of radioactive materials not released together with stack gas. The concept on which this rule is based is to ensure that in the case of incidents during which the result of effluent monitoring remains meaningful, such monitoring can be reliably performed. (orig./HSCH) [de

  3. Role of automation in the ACRV operations

    Science.gov (United States)

    Sepahban, S. F.

    1992-01-01

    The Assured Crew Return Vehicle (ACRV) will provide the Space Station Freedom with contingency means of return to earth (1) of one disabled crew member during medical emergencies, (2) of all crew members in case of accidents or failures of SSF systems, and (3) in case of interruption of the Space Shuttle flights. A wide range of vehicle configurations and system approaches are currently under study. The Program requirements focus on minimizing life cycle costs by ensuring simple operations, built-in reliability and maintainability. The ACRV philosophy of embedded operations is based on maximum use of existing facilities, resources and processes, while minimizing the interfaces and impacts to the Space Shuttle and Freedom programs. A preliminary integrated operations concept based on this philosophy and covering the ground, flight, mission support, and landing and recovery operations has been produced. To implement the ACRV operations concept, the underlying approach has been to rely on vehicle autonomy and automation, to the extent possible. Candidate functions and processes which may benefit from current or near-term automation and robotics technologies are identified. These include, but are not limited to, built-in automated ground tests and checkouts; use of the Freedom and the Orbiter remote manipulator systems, for ACRV berthing; automated passive monitoring and performance trend analysis, and periodic active checkouts during dormant periods. The major ACRV operations concept issues as they relate to the use of automation are discussed.

  4. The role of cognitive operations in reality monitoring: a study with healthy older adults and Alzheimer's-type dementia.

    Science.gov (United States)

    Fairfield, Beth; Mammarella, Nicola

    2009-01-01

    The authors examined the role of cognitive operations in discriminations between externally and internally generated events (e.g., reality monitoring) in healthy and pathological aging. The authors used 2 reality-monitoring distinctions to manipulate the quantity and quality of necessary cognitive operations: discriminating between I performed versus I imagined performing and between I watched another perform versus I imagined another performing. Older adults had more difficulty than did younger adults when discriminating between memories in both versions of the task. In addition, older adults with Alzheimer's-type dementia showed marked difficulties when attributing a source to imagined actions. The authors interpret these findings in terms of an age difficulty or the failure to use cognitive operations as useful cues during source monitoring.

  5. Innovative Concepts and Operational Techniques for the Strategic National Stockpile

    International Nuclear Information System (INIS)

    Adams, S. A.

    2007-01-01

    This presentation is to discuss the innovative concepts and operational techniques developed by the Center for Disease Control and Prevention's Division of Strategic National Stockpile (DSNS). The primary response model for the SNS is to move from secure strategic storage locations to an area of need within 12 hours to augment local resources. While this 12 hour response is appropriate for most threat scenarios, it clearly cannot meet the needs of first line responders who need to rapidly administer initial dosing of nerve agent antidote. To address the threat of nerve agent poisoning the DSNS developed the CHEMPACK Project which allows centralized SNS management forward placement within hundreds of local jurisdictions. Another variation from the primary mission of the DSNS is addressing the nation's potential shortfall in non-acute care bed capacity. To address this mission, the Federal Medical Station (FMS) program was created to build surge capability to meet a range of non-acute medical needs following a disaster. The FMS model is a pre-configured 250 bed unit that is deployable throughout the Nation and configured to respond rapidly. Operational techniques used to maximize product lifespan and efficacy will also be discussed.(author)

  6. The process monitoring computer system an integrated operations and safeguards surveillance system

    International Nuclear Information System (INIS)

    Liester, N.A.

    1995-01-01

    The use of the Process Monitoring Computer System (PMCS) at the Idaho Chemical Processing Plant (ICPP) relating to Operations and Safeguards concerns is discussed. Measures taken to assure the reliability of the system data are outlined along with the measures taken to assure the continuous availability of that data for use within the ICPP. The integration of process and safeguards information for use by the differing organizations is discussed. The PMCS successfully demonstrates the idea of remote Safeguards surveillance and the need for sharing of common information between different support organizations in an operating plant

  7. Pair-Wise Trajectory Management-Oceanic (PTM-O) . [Concept of Operations—Version 3.9

    Science.gov (United States)

    Jones, Kenneth M.

    2014-01-01

    This document describes the Pair-wise Trajectory Management-Oceanic (PTM-O) Concept of Operations (ConOps). Pair-wise Trajectory Management (PTM) is a concept that includes airborne and ground-based capabilities designed to enable and to benefit from, airborne pair-wise distance-monitoring capability. PTM includes the capabilities needed for the controller to issue a PTM clearance that resolves a conflict for a specific pair of aircraft. PTM avionics include the capabilities needed for the flight crew to manage their trajectory relative to specific designated aircraft. Pair-wise Trajectory Management PTM-Oceanic (PTM-O) is a regional specific application of the PTM concept. PTM is sponsored by the National Aeronautics and Space Administration (NASA) Concept and Technology Development Project (part of NASA's Airspace Systems Program). The goal of PTM is to use enhanced and distributed communications and surveillance along with airborne tools to permit reduced separation standards for given aircraft pairs, thereby increasing the capacity and efficiency of aircraft operations at a given altitude or volume of airspace.

  8. Monitoring in educational development projects : the development of a monitoring system

    NARCIS (Netherlands)

    Plomp, T.; Huijsman, Hari; Kluyfhout, Eric

    1992-01-01

    Monitoring in education is usually focused on the monitoring of educational systems at different levels. Monitoring of educational projects receives only recently explicit attention. The paper discusses first the concepts of educational monitoring and evaluation. After that, the experience with

  9. New concept for a compact tape transport system

    International Nuclear Information System (INIS)

    Mlekodaj, R.L.; Zganjar, E.F.; Cole, J.D.

    1980-01-01

    A new concept in tape transport systems for the collection and counting of radioactive samples from an on-line isotope separator has been developed. This new compact design was motivated by space limitations but important additional improvements over previous designs were made in cost, simplicity and vacuum quality. The system is based on a continuous loop of 6.5 millimeter wide recording tape 116 meters long with a conducting coating on one side for beam current monitoring. One small stepping motor is required for operation

  10. Air Traffic Management Technology Demonstration-1 Concept of Operations (ATD-1 ConOps), Version 3.0

    Science.gov (United States)

    Baxley, Brian T.; Johnson, William C.; Scardina, John; Shay, Richard F.

    2016-01-01

    This document describes the goals, benefits, technologies, and procedures of the Concept of Operations (ConOps) for the Air Traffic Management (ATM) Technology Demonstration #1 (ATD-1), and provides an update to the previous versions of the document [ref 1 and ref 2].

  11. IBM i5iSeries Primer Concepts and Techniques for Programmers, Administrators, and System Operators

    CERN Document Server

    Forsythe, Kevin; Holt, Ted; Pence, Doug

    2012-01-01

    This comprehensive, 35-chapter book is the ultimate resource and a "must-have" for every professional working with the i5/iSeries. It is perfect for novice and intermediate programmers as well as for system administrators and operators. In simple, straightforward style, the authors explain core i5/iSeries concepts and show you step by step how to perform a wide variety of essential functions. The book includes sections on installation, operations, administration, system architecture, programming, the Internet, and troubleshooting. These sections are organized in free-standing style so you d

  12. Operator support systems using artificial intelligence: actual situation and future in Belgium

    International Nuclear Information System (INIS)

    Vlaminck, M. de

    1992-01-01

    The paper describes the concept of the OPERATOR ADVISOR(=OPA) expert system to assist plant operators for optimal recovery following an accident. OPA uses an object-oriented expert system to access an appropriate knowledge base for either knowledge acquisition or retrieving information for the operators. The main advantages of such a system are: On-line access to a flexible and easy adaptable knowledge base; Post accident monitoring of all operator actions; Priority listing of all needed actions; The availability of relevant background information. (orig.)

  13. Coordinated protection of the population in emergencies in Switzerland: The National Emergency Operations Centre (NAZ) and the Emergency Organisation Radioactivity (EOR)

    International Nuclear Information System (INIS)

    Brunner, H.H.

    1992-01-01

    As consequence of the nuclear weapons tests Switzerland has since 30 years expert commissions, concepts, monitoring networks, monitoring and emergency teams for the protection of the population following radiological accidents of all types inside or outside the country. Thus Chernobyl hit a prepared country - except information. The Radiological Emergency Organisation (EOR) and its National Emergency Operations Centre (NAZ) have up-to-date legal bases, concepts and operational means. Besides radiological events, NAZ deals also with chemical accidents, satellite, satellite crashes and dam breaks. Unique is the coordinated use of the combined means of civil authorities, civil defense and army in all strategic cases. (author)

  14. Research on transfer rule of the monitoring of operator in digital main control room of nuclear power plant

    International Nuclear Information System (INIS)

    Zhang Li; Li Linfeng; Li Pengcheng; Lu Changshen; Huang Weigang; Dai Zhonghua; Huang Yuanzheng; Chen Qingqing

    2013-01-01

    In the digital main control room of nuclear power plants, monitoring the operating status of the system of reactor is not only one of the most important tasks of the operators, but also the basis and premise of controlling the system of reactor running correctly. After analyzing, inducing, summarizing the data obtained, we found the operators' monitor behavior could be classified as procedure transfer, abnormal transfer, and exchange transfer. The times of exchange transfer is 29% of the total transfer times, abnormal transfer is 14%, regulation transfer is 36%, and others are 21%. (authors)

  15. Environmental monitoring program design for uranium refining and conversion operations

    International Nuclear Information System (INIS)

    1984-08-01

    The objective of this study was to develop recommendations for the design of environmental monitoring programs at Canadian uranium refining and conversion operations. In order to develop monitoring priorities, chemical and radioactive releases to the air and water were developed for reference uranium refining and conversion facilities. The relative significance of the radioactive releases was evaluated through a pathways analysis which estimated dose to individual members of the critical receptor group. The effects of chemical releases to the environment were assessed by comparing predicted air and water contaminant levels to appropriate standards or guidelines. For the reference facilities studied, the analysis suggested that environmental effects are likely to be dominated by airborne release of both radioactive and nonradioactive contaminants. Uranium was found to be the most important radioactive species released to the air and can serve as an overall indicator of radiological impacts for any of the plants considered. The most important nonradioactive air emission was found to be fluoride (as hydrogen fluoride) from the uranium hexafluoride plant. For the uranium trioxide and uranium dioxide plants, air emissions of oxides of nitrogen were considered to be most important. The study recommendations for the design of an environmental monitoring program are based on consideration of those factors most likely to affect local air and water quality, and human radiation exposure. Site- and facility-specific factors will affect monitoring program design and the selection of components such as sampling media, locations and frequency, and analytical methods

  16. Optimizing the data acquisition rate for a remotely controllable structural monitoring system with parallel operation and self-adaptive sampling

    International Nuclear Information System (INIS)

    Sheng, Wenjuan; Guo, Aihuang; Liu, Yang; Azmi, Asrul Izam; Peng, Gang-Ding

    2011-01-01

    We present a novel technique that optimizes the real-time remote monitoring and control of dispersed civil infrastructures. The monitoring system is based on fiber Bragg gating (FBG) sensors, and transfers data via Ethernet. This technique combines parallel operation and self-adaptive sampling to increase the data acquisition rate in remote controllable structural monitoring systems. The compact parallel operation mode is highly efficient at achieving the highest possible data acquisition rate for the FBG sensor based local data acquisition system. Self-adaptive sampling is introduced to continuously coordinate local acquisition and remote control for data acquisition rate optimization. Key issues which impact the operation of the whole system, such as the real-time data acquisition rate, data processing capability, and buffer usage, are investigated. The results show that, by introducing parallel operation and self-adaptive sampling, the data acquisition rate can be increased by several times without affecting the system operating performance on both local data acquisition and remote process control

  17. Monitoring equipment environment during nuclear plant operation at Salem and Hope Creek generating stations

    International Nuclear Information System (INIS)

    Blum, A.; Smith, R.J.

    1991-01-01

    Monitoring of environmental parameters has become a significant issue for operating nuclear power plants. While the long-term benefits of plant life extension programs are being pursued with comprehensive environmental monitoring programs, the potential effect of local hot spots at various plant locations needs to be evaluated for its effect on equipment degradation and shortening of equipment qualified life. A significant benefit can be experienced from temperature monitoring when a margin exists between the design versus actual operating temperature. This margin can be translated into longer equipment qualified life and significant reduction in maintenance activities. At PSE and G, the immediate need for monitoring environmental parameters is being accomplished via the use of a Logic Beach Bitlogger. The Bitlogger is a portable data loggings system consisting of a system base, input modules and a communication software package. Thermocouples are installed on selected electrical equipment and cables are run from the thermocouples to the input module of the Bitlogger. Temperature readings are taken at selected intervals, stored in memory, and downloaded periodically to a PC software program, i.e., Lotus. The data is formatted into tabular or graphical documents. Because of their versatility, Bitloggers are being used differently at the authors Nuclear facility. At the Salem Station (2 Units-4 loop Westinghouse PWR), a battery powered, fully portable, calibrated Bitlogger is located in an accessible area inside Containment where it monitors the temperature of various electrical equipment within the Pressurizer Enclosure. It is planned that close monitoring of the local hot spot temperatures in this area will allow them to adjust and reconcile the environmental qualification of the equipment

  18. Converter Compressor Building, SWMU 089, Hot Spot Areas 1, 2, and 5 Operations, Maintenance, and Monitoring Report, Kennedy Space Center, Florida

    Science.gov (United States)

    Wilson, Deborah M.

    2015-01-01

    This Operations, Maintenance, and Monitoring Report (OMMR) presents the findings, observations, and results from operation of the air sparging (AS) interim measure (IM) for Hot Spot (HS) Areas 1, 2, and 5 at the Converter Compressor Building (CCB) located at Kennedy Space Center (KSC), Florida. The objective of the IM at CCB HS Areas 1, 2, and 5 is to decrease concentrations of volatile organic compounds (VOCs) in groundwater in the treatment zones via AS to levels that will enable a transition to a monitored natural attenuation (MNA) phase. This OMMR presents system operations and maintenance (O&M) information and performance monitoring results since full-scale O&M began in June 2014 (2 months after initial system startup in April 2014), including quarterly performance monitoring events in July and October 2014 and January and May 2015. Based on the results to date, the AS system is operating as designed and is meeting the performance criteria and IM objective. The performance monitoring network is adequately constructed for assessment of IM performance at CCB HS Areas 1, 2, and 5. At the March 2014 KSC Remediation Team (KSCRT) Meeting, team consensus was reached for the design prepared for expansion of the system to treat the HS 4 area, and at the November 2014 KSCRT Meeting, team consensus was reached that HS 3 was adequately delineated horizontally and vertically and for selection of AS for the remedial approach for HS 3. At the July 2015 KSCRT meeting, team consensus was reached to continue IM operations in all zones until HSs 3 and 4 is operational, once HS 3 and 4 zones are operational discontinue operations in HS 1, 2, and 5 zones where concentrations are less than GCTLs to observe whether rebounding conditions occur. Team consensus was also reached to continue quarterly performance monitoring to determine whether operational zones achieve GCTLs and to continue annual IGWM of CCB-MW0012, CCBMW0013, and CCB-MW0056, located south of the treatment area. The

  19. Traffic Aware Strategic Aircrew Requests (TASAR) Concept of Operations

    Science.gov (United States)

    Henderson, Jeffrey

    2013-01-01

    Aircrews submit trajectory change requests to air traffic control (ATC) to better achieve the operator's preferred business trajectory. Requests are currently made with limited information and are often denied because the change is not compatible with traffic. Also, request opportunities can be overlooked due to lack of automation that advises aircrews of trajectory changes that improve flight time, fuel burn, and other objectives. The Traffic Aware Strategic Aircrew Requests (TASAR) concept leverages Automatic Dependent Surveillance-Broadcast (ADS-B) surveillance information to advise the aircrew of beneficial trajectory changes that are probed for traffic compatibility prior to issuing the request to ATC. This document describes the features, benefits, and limitations of TASAR automation hosted on an Electronic Flight Bag. TASAR has two modes: (1) auto mode that continuously assesses opportunities for improving the performance of the flight and (2) manual mode that probes trajectory changes entered by aircrews for conflicts and performance objectives. The roles and procedures of the aircrew and ATC remain unchanged under TASAR.

  20. Design and analysis of aquatic monitoring programs at nuclear power plants

    International Nuclear Information System (INIS)

    McKenzie, D.H.; Kannberg, L.D.; Gore, K.L.; Arnold, E.M.; Watson, D.G.

    1977-11-01

    This report addresses some of the problems of designing, conducting, and analyzing aquatic environmental monitoring programs for impact assessment of nuclear power plants. The concepts discussed are applicable to monitoring the effects of chemical, radioactive, or thermal effluents. The concept of control and treatment station pairs is the fundamental basis for the experimental method proposed. This concept is based on the hypothesis that the relationship between the two stations forming the pair can be estimated from the preoperational period and that this relationship holds during the operational period. Any changes observed in this relationship during the operational period are assumed to be the result of the power plant impacts. Thus, it is important that station pairs are selected so it can be assumed that they respond to natural environmental changes in a manner that maintains that relationship. The major problem in establishing the station pairs will be the location of the control station. The universal heterogeneity in the environment will prevent the establishment of identical station pairs. The requirement that the control station remain unaffected by the operation of the power plant dictates a spacial separation with its associated differences in habitat. Thus, selection of the control station will be based upon balancing the following two criteria: (1) far enough away from the plant site to be beyond the plant influence, and (2) close enough to the treatment station that the biological communities will respond to natural environmental changes consistently in the same manner

  1. Continuous wireless pressure monitoring and mapping with ultra-small passive sensors for health monitoring and critical care.

    Science.gov (United States)

    Chen, Lisa Y; Tee, Benjamin C-K; Chortos, Alex L; Schwartz, Gregor; Tse, Victor; Lipomi, Darren J; Wong, H-S Philip; McConnell, Michael V; Bao, Zhenan

    2014-10-06

    Continuous monitoring of internal physiological parameters is essential for critical care patients, but currently can only be practically achieved via tethered solutions. Here we report a wireless, real-time pressure monitoring system with passive, flexible, millimetre-scale sensors, scaled down to unprecedented dimensions of 1 × 1 × 0.1 cubic millimeters. This level of dimensional scaling is enabled by novel sensor design and detection schemes, which overcome the operating frequency limits of traditional strategies and exhibit insensitivity to lossy tissue environments. We demonstrate the use of this system to capture human pulse waveforms wirelessly in real time as well as to monitor in vivo intracranial pressure continuously in proof-of-concept mice studies using sensors down to 2.5 × 2.5 × 0.1 cubic millimeters. We further introduce printable wireless sensor arrays and show their use in real-time spatial pressure mapping. Looking forward, this technology has broader applications in continuous wireless monitoring of multiple physiological parameters for biomedical research and patient care.

  2. Significance of Operating Environment in Condition Monitoring of Large Civil Structures

    OpenAIRE

    Alampalli, Sreenivas

    1999-01-01

    Success of remote long-term condition monitoring of large civil structures and developing calibrated analytical models for damage detection, depend significantly on establishing accurate baseline signatures and their sensitivity. Most studies reported in the literature concentrated on the effect of structural damage on modal parameters without emphasis on reliability of modal parameters. Thus, a field bridge structure was studied for the significance of operating conditions in relation to bas...

  3. The LG-bank control concept: An improved method for PWR load-following operation

    International Nuclear Information System (INIS)

    Park, Won Seok; Christenson, J.M.

    1990-01-01

    In this paper the authors present the results of an investigation of a new pressurized water reactor load-following control concept that utilizes light gray (LG) banks in combination with a single high-worth bank. The investigation determined a control strategy and a set of nuclear design parameters for the control banks that permits unrestricted load-following operation over a wide power range at both beginning-of-cycle and end-of-cycle conditions. Advantages of the LG-bank control concept are that flexible load-following maneuvers can be performed without either making changes in the boron concentration or requiring the continuous insertion of a high-worth control bank. These features remove both of the disadvantages of current gray-bank load-following designs, which generally require the continuous insertion of a high-worth bank and in some cases also involve changes in the boron concentration

  4. Analog Testing of Operations Concepts for Mitigation of Communication Latency During Human Space Exploration

    Science.gov (United States)

    Chappell, Steven P.; Abercromby, Andrew F.; Miller, Matthew J.; Halcon, Christopher; Gernhardt, Michael L.

    2016-01-01

    OBJECTIVES: NASA Extreme Environment Mission Operations (NEEMO) is an underwater spaceflight analog that allows a true mission-like operational environment and uses buoyancy effects and added weight to simulate different gravity levels. Three missions were undertaken from 2014-2015, NEEMO's 18-20. All missions were performed at the Aquarius undersea research habitat. During each mission, the effects of varying operations concepts and tasks type and complexity on representative communication latencies associated with Mars missions were studied. METHODS: 12 subjects (4 per mission) were weighed out to simulate near-zero or partial gravity extravehicular activity (EVA) and evaluated different operations concepts for integration and management of a simulated Earth-based science backroom team (SBT) to provide input and direction during exploration activities. Exploration traverses were planned in advance based on precursor data collected. Subjects completed science-related tasks including presampling surveys, geologic-based sampling, and marine-based sampling as a portion of their tasks on saturation dives up to 4 hours in duration that were to simulate extravehicular activity (EVA) on Mars or the moons of Mars. One-way communication latencies, 5 and 10 minutes between space and mission control, were simulated throughout the missions. Objective data included task completion times, total EVA times, crew idle time, translation time, SBT assimilation time (defined as time available for SBT to discuss data/imagery after it has been collected, in addition to the time taken to watch imagery streaming over latency). Subjective data included acceptability, simulation quality, capability assessment ratings, and comments. RESULTS: Precursor data can be used effectively to plan and execute exploration traverse EVAs (plans included detailed location of science sites, high-fidelity imagery of the sites, and directions to landmarks of interest within a site). Operations concepts that

  5. Draft Function Allocation Framework and Preliminary Technical Basis for Advanced SMR Concepts of Operations

    Energy Technology Data Exchange (ETDEWEB)

    Hugo, Jacques [Idaho National Lab. (INL), Idaho Falls, ID (United States); Forester, John [Idaho National Lab. (INL), Idaho Falls, ID (United States); Gertman, David [Idaho National Lab. (INL), Idaho Falls, ID (United States); Joe, Jeffrey [Idaho National Lab. (INL), Idaho Falls, ID (United States); Medema, Heather [Idaho National Lab. (INL), Idaho Falls, ID (United States); Persensky, Julius [Idaho National Lab. (INL), Idaho Falls, ID (United States); Whaley, April [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2013-08-01

    This report presents preliminary research results from the investigation into the development of new models and guidance for Concepts of Operations in advanced small modular reactor (AdvSMR) designs. AdvSMRs are nuclear power plants (NPPs), but unlike conventional large NPPs that are constructed on site, AdvSMRs systems and components will be fabricated in a factory and then assembled on site. AdvSMRs will also use advanced digital instrumentation and control systems, and make greater use of automation. Some AdvSMR designs also propose to be operated in a multi-unit configuration with a single central control room as a way to be more cost-competitive with existing NPPs. These differences from conventional NPPs not only pose technical and operational challenges, but they will undoubtedly also have regulatory compliance implications, especially with respect to staffing requirements and safety standards.

  6. Condition based monitoring, diagnosis and maintenance on operating equipments of a hydraulic generator unit

    International Nuclear Information System (INIS)

    Liu, X T; Feng, F Z; Si, A W

    2012-01-01

    According to performance characteristics of operating equipments in a hydraulic generator unit (HGU), the relative techniques on condition monitoring and fault diagnosis (CMFD) are introduced in this paper, especially the key technologies are emphasized, such as equipment monitoring, expert system (ES), intelligent diagnosis and condition based maintenance (CBM). Meanwhile, according to the instructor on CBM proposed by State electric power corporation, based on integrated mode, the main steps on implementation of CBM are discussed in this paper.

  7. Air quality monitoring of the post-operative recovery room and locations surrounding operating theaters in a medical center in Taiwan.

    Directory of Open Access Journals (Sweden)

    Chin-Sheng Tang

    Full Text Available To prevent surgical site infection (SSI, the airborne microbial concentration in operating theaters must be reduced. The air quality in operating theaters and nearby areas is also important to healthcare workers. Therefore, this study assessed air quality in the post-operative recovery room, locations surrounding the operating theater area, and operating theaters in a medical center. Temperature, relative humidity (RH, and carbon dioxide (CO2, suspended particulate matter (PM, and bacterial concentrations were monitored weekly over one year. Measurement results reveal clear differences in air quality in different operating theater areas. The post-operative recovery room had significantly higher CO2 and bacterial concentrations than other locations. Bacillus spp., Micrococcus spp., and Staphylococcus spp. bacteria often existed in the operating theater area. Furthermore, Acinetobacter spp. was the main pathogen in the post-operative recovery room (18% and traumatic surgery room (8%. The mixed effect models reveal a strong correlation between number of people in a space and high CO2 concentration after adjusting for sampling locations. In conclusion, air quality in the post-operative recovery room and operating theaters warrants attention, and merits long-term surveillance to protect both surgical patients and healthcare workers.

  8. Air quality monitoring of the post-operative recovery room and locations surrounding operating theaters in a medical center in Taiwan.

    Science.gov (United States)

    Tang, Chin-Sheng; Wan, Gwo-Hwa

    2013-01-01

    To prevent surgical site infection (SSI), the airborne microbial concentration in operating theaters must be reduced. The air quality in operating theaters and nearby areas is also important to healthcare workers. Therefore, this study assessed air quality in the post-operative recovery room, locations surrounding the operating theater area, and operating theaters in a medical center. Temperature, relative humidity (RH), and carbon dioxide (CO2), suspended particulate matter (PM), and bacterial concentrations were monitored weekly over one year. Measurement results reveal clear differences in air quality in different operating theater areas. The post-operative recovery room had significantly higher CO2 and bacterial concentrations than other locations. Bacillus spp., Micrococcus spp., and Staphylococcus spp. bacteria often existed in the operating theater area. Furthermore, Acinetobacter spp. was the main pathogen in the post-operative recovery room (18%) and traumatic surgery room (8%). The mixed effect models reveal a strong correlation between number of people in a space and high CO2 concentration after adjusting for sampling locations. In conclusion, air quality in the post-operative recovery room and operating theaters warrants attention, and merits long-term surveillance to protect both surgical patients and healthcare workers.

  9. Methodology for calculating perception of the user experience of the quality of monitored integrated telecommunications operator services

    NARCIS (Netherlands)

    2011-01-01

    The invention relates to a method for calculating perception of the user experience of the quality of monitored integrated telecommunications operator services. For this purpose, data from the monitoring of user services is used, along with questionnaires previously completed by a representative

  10. Sharing data between mobile devices, connected vehicles and infrastructure - task 3: concept of operations : technical memorandum -final.

    Science.gov (United States)

    2016-07-13

    This report describes the concept of operation for the use of mobile devices in a connected vehicle environment. Specifically, it identifies the needs, conceptual system, and potential scenarios that serve as the basis for demonstrating both safety a...

  11. RAS III - concept and operating experience

    International Nuclear Information System (INIS)

    Kunze, U.; Wander, J.

    1990-01-01

    A new noise analysis system RAS III is being employed at the Greifswald NPP 'Bruno Leuschner' units 5 and 6 which differs from its forerunner types by an extended number of measuring points and a higher degree of automation. Substantial prerequisite of the system's full efficiency is implementation of efficient signal monitoring techniques that free the power plant engineer from routine work as well. The system has therefore been completed by algorithms established for automatic noise signal spectra control and for monitoring the pressure vessel vibrations. Moreover, a number of special techniques have been developed, such as for recording velocity-time plots during control element drop experiments. (author)

  12. Real-time stability monitoring method for boiling water reactor nuclear power plants

    International Nuclear Information System (INIS)

    Fukunishi, K.; Suzuki, S.

    1987-01-01

    A method for real-time stability monitoring is developed for supervising the steady-state operation of a boiling water reactor core. The decay ratio of the reactor power fluctuation is determined by measuring only the output neutron noise. The concept of an inverse system is introduced to identify the dynamic characteristics of the reactor core. The adoption of an adaptive digital filter is useful in real-time identification. A feasibility test that used measured output noise as an indication of reactor power suggests that this method is useful in a real-time stability monitoring system. Using this method, the tedious and difficult work for modeling reactor core dynamics can be reduced. The method employs a simple algorithm that eliminates the need for stochastic computation, thus making the method suitable for real-time computation with a simple microprocessor. In addition, there is no need to disturb the reactor core during operation. Real-time stability monitoring using the proposed algorithm may allow operation under less stable margins

  13. The Swiss disaster management plan for coping with the aftermath of radiological dispersal devices - ''dirty bomb'' operational concept

    International Nuclear Information System (INIS)

    Stoffel, F.; Blaettler, M.; Leonardi, A.

    2009-01-01

    In 2007 the Swiss Federal Commission for NRBC Protection released a disaster management plan for coping with the aftermath of radiological dispersal devices. This paper summarises the basic concept and outlines the relevant bodies and agencies as well as their responsibilities. It also sets out the strategy to monitor radioactive contamination and the measures to prevent public radiation exposure. (orig.)

  14. Personnel reliability impact on petrochemical facilities monitoring system's failure skipping probability

    Science.gov (United States)

    Kostyukov, V. N.; Naumenko, A. P.

    2017-08-01

    The paper dwells upon urgent issues of evaluating impact of actions conducted by complex technological systems operators on their safe operation considering application of condition monitoring systems for elements and sub-systems of petrochemical production facilities. The main task for the research is to distinguish factors and criteria of monitoring system properties description, which would allow to evaluate impact of errors made by personnel on operation of real-time condition monitoring and diagnostic systems for machinery of petrochemical facilities, and find and objective criteria for monitoring system class, considering a human factor. On the basis of real-time condition monitoring concepts of sudden failure skipping risk, static and dynamic error, monitoring systems, one may solve a task of evaluation of impact that personnel's qualification has on monitoring system operation in terms of error in personnel or operators' actions while receiving information from monitoring systems and operating a technological system. Operator is considered as a part of the technological system. Although, personnel's behavior is usually a combination of the following parameters: input signal - information perceiving, reaction - decision making, response - decision implementing. Based on several researches on behavior of nuclear powers station operators in USA, Italy and other countries, as well as on researches conducted by Russian scientists, required data on operator's reliability were selected for analysis of operator's behavior at technological facilities diagnostics and monitoring systems. The calculations revealed that for the monitoring system selected as an example, the failure skipping risk for the set values of static (less than 0.01) and dynamic (less than 0.001) errors considering all related factors of data on reliability of information perception, decision-making, and reaction fulfilled is 0.037, in case when all the facilities and error probability are under

  15. Connecting section and associated systems concept for the spray calciner/in-can melter process

    International Nuclear Information System (INIS)

    Petkus, L.L.; Gorton, P.S.; Blair, H.T.

    1981-06-01

    For a number of years, researchers at the Pacific Northwest Laboratory have been developing processes and equipment for converting high-level liquid wastes to solid forms. One of these processes is the Spray Calciner/In-Can Melter system. To immobilize high-level liquid wastes, this system must be operated remotely, and the calcine must be reliably conveyed from the calciner to the melting furnace. A concept for such a remote conveyance system was developed at the Pacific Northwest Laboratory, and equipment was tested under full-scale, nonradioactive conditions. This concept and the design of demonstration equipment are described, and the results of equipment operation during experimental runs of 7 d are presented. The design includes a connecting section and its associated systems - a canister sypport and alignment concept and a weight-monitoring system for the melting furnace. Overall, the runs demonstrated that the concept design is an acceptable method of connecting the two pieces of process equipment together. Although the connecting section has not been optimized in all areas of concern, it provides a first-generation design of a production-oriented system

  16. The critical safety functions and plant operation

    International Nuclear Information System (INIS)

    Corcoran, W.R.; Church, J.F.; Porter, N.J.; Cross, M.T.; Guinn, W.M.

    1981-01-01

    The paper outlines the operator's role in nuclear safety and introduces the concept of ''safety functions''. Safety functions are a group of actions that prevent core melt or minimize radiation releases to the general public. They can be used to provide a hierarchy of practical plant protection that an operator should use. ''An accident identical to that at Three Mile Island is not going to happen again'', said the Rogovin investigators. The concepts put forward in this paper are intended to help the operator avoid serious consequence from the next unexpected threat. On the basis of the safety evaluation, the operator has three roles in assuring that the consequences of an event will be no worse than the predicted acceptable results. These three operator roles are: first, maintain plant setup in readiness to properly respond; second, operate the plant in a manner such that fewer, milder events minimize the frequency and the severity of adverse events; third, the operator needs to monitor the plant to verify that the safety functions are accomplished. The operator needs a systematic approach to mitigating the consequences of an event. The concept of ''safety function'' introduces that systematic approach and prevents a hierarchy of protection. If the operator has difficulty in identifying an event for any reason, the systematic safety function approach allows ones to accomplish the overall path of mitigating consequences. There are ten identified functions designed to protect against core melt, preserve containment integrity, prevent indirect release of radioactivity, and maintain vital auxiliaries needed to support the other safety functions. The paper describes in detail the operator's role and the safety functions, and provides many examples of the use of alternative success paths to accomplish the safety function

  17. Psychophysiological monitoring of operator's emotional stress in aviation and astronautics.

    Science.gov (United States)

    Simonov, P V; Frolov, M V; Ivanov, E A

    1980-01-01

    The level of emotional stress depending on the power of motivation and the estimation by the subject of the probability (possibility) of goal achievement, largely influences the operator's skill performance (that of a pilot, controller, astronaut). A decrease in the emotional tonus leads to drowsiness, lack of vigilance, missing of significant signals, and to slower reactions. The extremely high stress level disorganizes the activity, complicates it with a trend toward untimely acts and reactions to the insignificant signals (false alarms). The best methods to monitor the degree of the operator's emotional state during his skill performance are the integral estimation of the changes in heart-rate and T-peak amplitude, as well as the analysis of spectral and intonational characteristics of the human voice during radio conversation. These methods were tested on paratroopers, pilots in civil aviation, and airport controllers.

  18. Point-to-Point! Validation of the Small Aircraft Transportation System Higher Volume Operations Concept

    Science.gov (United States)

    Williams, Daniel M.

    2006-01-01

    Described is the research process that NASA researchers used to validate the Small Aircraft Transportation System (SATS) Higher Volume Operations (HVO) concept. The four phase building-block validation and verification process included multiple elements ranging from formal analysis of HVO procedures to flight test, to full-system architecture prototype that was successfully shown to the public at the June 2005 SATS Technical Demonstration in Danville, VA. Presented are significant results of each of the four research phases that extend early results presented at ICAS 2004. HVO study results have been incorporated into the development of the Next Generation Air Transportation System (NGATS) vision and offer a validated concept to provide a significant portion of the 3X capacity improvement sought after in the United States National Airspace System (NAS).

  19. The Secret of Future Defeat: The Evolution of US Joint and Army Doctrine 1993-2006 and the Flawed Conception of Stability Operations

    Science.gov (United States)

    2007-05-24

    The Secret of Future Defeat: the Evolution of US Joint and Army Doctrine 1993-2006 and the Flawed Conception of Stability Operations A...4. TITLE AND SUBTITLE The Secret of Future Defeat: the Evolution of US Joint and 5a. CONTRACT NUMBER Army Doctrine 1993-2006 and the Flawed... The Secret of Future Defeat: the Evolution of US Joint and Army Doctrine 1993-2006 and the Flawed Conception of Stability Operations Approved by

  20. Westinghouse Hanford Company Operational Environmental Monitoring. Annual report, CY 1993

    International Nuclear Information System (INIS)

    Schmidt, J.W.; Johnson, A.R.; Markes, B.M.; McKinney, S.M.; Perkins, C.J.

    1994-07-01

    This document presents the results of the Westinghouse Hanford Company near-facility operational environmental monitoring for 1993 in the 100, 200/600, and 300/400 Areas of the Hanford Site, in south-central Washington State. Surveillance activities included sampling and analyses of ambient air, surface water, groundwater, sediments, soil, and biota. Also, external radiation measurements and radiological surveys were taken at waste disposal sites, radiologically controlled areas, and roads. These activities were conducted to assess and control the effects of nuclear facilities and waste sites on the local environment. In addition, diffuse sources were monitored to determine compliance with Federal, State, and/or local regulations. In general, although effects from nuclear facilities are still seen on the Hanford Site and radiation levels are slightly elevated when compared to offsite conditions, the differences are less than in previous years. At certain locations on or directly adjacent to nuclear facilities and waste sites, levels can be several times higher than offsite conditions

  1. Official dosimetry with individual electronic dosemeters - the concept in Germany

    International Nuclear Information System (INIS)

    Czarwinski, R.; Kaulard, J.; Pfeffer, W.

    2005-01-01

    Full text: Presently, in Germany passive dosemeters (film batches, RPL, TLD) are used for the official individual monitoring of occupational exposed personal. The application of electronic individual dosemeters (EPD) is carried out mainly for the operative radiation protection control particularly in nuclear power engineering companies, big hospitals und research centres. This means in such institutions double monitoring exists - legally and operatively. A crucial advantage of EPD compared to passive dosemeter is the possibility to adapt the monitoring period to the working time in the control area, e.g. a job related monitoring is available. Germany started a project for an optimized implementation of EPD into the official dosimetry. Objective of the project whose results will be described in the paper is the harmonization of radiation protection of companies workers and outside workers concerning the record of individual and job related exposures. The approval of the EPD by the Federal and Laender authorities as an official dosimetric system demands the implementation of special requirements concerning the data acquisition, data transfer and data evaluation. These issues are focuses of the Federal research project, supervised by the Federal Office for Radiation Protection (BfS) and performed by the Gesellschaft fuer Anlagen- und Reaktorsicherheit (GRS), Cologne to develop a concept in the first stage. (author)

  2. 3rd International Conference on Condition Monitoring of Machinery in Non-Stationary Operations

    CERN Document Server

    Rubini, Riccardo; D'Elia, Gianluca; Cocconcelli, Marco; Chaari, Fakher; Zimroz, Radoslaw; Bartelmus, Walter; Haddar, Mohamed

    2014-01-01

    This book presents the processings of the third edition of the Condition Monitoring of Machinery in Non-Stationary Operations (CMMNO13) which was held in Ferrara, Italy. This yearly event merges an international community of researchers who met – in 2011 in Wroclaw (Poland) and in 2012 in Hammamet (Tunisia) – to discuss issues of diagnostics of rotating machines operating in complex motion and/or load conditions. The growing interest of the industrial world on the topics covered by the CMMNO13 involves the fields of packaging, automotive, agricultural, mining, processing and wind machines in addition to that of the systems for data acquisition.The participation of speakers and visitors from industry makes the event an opportunity for immediate assessment of the potential applications of advanced methodologies for the signal analysis. Signals acquired from machines often contain contributions from several different components as well as noise. Therefore, the major challenge of condition monitoring is to po...

  3. Lower-Temperature Subsurface Layout and Ventilation Concepts

    International Nuclear Information System (INIS)

    Christine L. Linden; Edward G. Thomas

    2001-01-01

    This analysis combines work scope identified as subsurface facility (SSF) low temperature (LT) Facilities System and SSF LT Ventilation System in the Technical Work Plan for Subsurface Design Section FY 01 Work Activities (CRWMS M and O 2001b, pp. 6 and 7, and pp. 13 and 14). In accordance with this technical work plan (TWP), this analysis is performed using AP-3.10Q, Analyses and Models. It also incorporates the procedure AP-SI.1Q, Software Management. The purpose of this analysis is to develop an overall subsurface layout system and the overall ventilation system concepts that address a lower-temperature operating mode for the Monitored Geologic Repository (MGR). The objective of this analysis is to provide a technical design product that supports the lower-temperature operating mode concept for the revision of the system description documents and to provide a basis for the system description document design descriptions. The overall subsurface layout analysis develops and describes the overall subsurface layout, including performance confirmation facilities (also referred to as Test and Evaluation Facilities) for the Site Recommendation design. This analysis also incorporates current program directives for thermal management

  4. Requirements for the authorization of operation os a calibration laboratory of gamma-ray monitors

    International Nuclear Information System (INIS)

    Silva, Raimundo Dias da; Kibrit, Eduardo

    2011-01-01

    This paper describes the process for obtaining the authorization of operation of a laboratory designed to calibrate area and personal monitors with gamma radiation, by using a sealed Cs-137 source. The regulations of Comissao Nacional de Energia Nuclear (CNEN) are deeply analysed and discussed. The authorization for construction, the authorization for modification of items important to safety, the authorization for the acquisition and handling of radiation sources, the authorization for operating, and the authorization for withdrawal of operation of the laboratory are also discussed. The paper also describes the technical and managerial requirements necessary to operate a gamma radiation calibration laboratory in Brazil. . (author)

  5. On-line sodium and cover as purity monitors gas operating tools at EBR-II

    International Nuclear Information System (INIS)

    Smith, C.R.F.; Richardson, W.J.; Holmes, J.T.

    1976-01-01

    Plugging temperature indicators, electrochemical oxygen meters and hydrogen diffusion meters are the on-line sodium purity monitors now in use at EBR-II. On-line gas chromatographs are used to monitor helium, hydrogen, oxygen and nitrogen impurities in the argon cover gases. Monitors for tritium-in-sodium and for hydrocarbons-in-cover gas have been developed and are scheduled for installation in the near future. An important advantage of on-line monitors over the conventional grab-sampling techniques is the speed of response to changing reactor conditions. This helps us to identify the source of the impurity, whether the cause may be transient or constant, and take corrective action as necessary. The oxygen meter is calibrated monthly against oxygen in sodium determined by the vanadium wire equilibration method. The other instruments either do not require calibration or are self-calibrating. The ranges, sensitivity and response times of all of the on-line purity monitors has proven satisfactory under EBR-II operating conditions

  6. An Internet of Things Approach to Electrical Power Monitoring and Outage Reporting

    Energy Technology Data Exchange (ETDEWEB)

    Koch, Daniel B [ORNL

    2017-01-01

    The so-called Internet of Things concept has captured much attention recently as ordinary devices are connected to the Internet for monitoring and control purposes. One enabling technology is the proliferation of low-cost, single board computers with built-in network interfaces. Some of these are capable of hosting full-fledged operating systems that provide rich programming environments. Taken together, these features enable inexpensive solutions for even traditional tasks such as the one presented here for electrical power monitoring and outage reporting.

  7. 40 CFR Appendix K to Part 75 - Quality Assurance and Operating Procedures for Sorbent Trap Monitoring Systems

    Science.gov (United States)

    2010-07-01

    ... Pump. Use a leak-tight, vacuum pump capable of operating within the candidate system's flow range. 5.1... sorbent trap monitoring system typically operates. The gas flow meter shall be equipped with any necessary... system typically operates. You may either follow the procedures in section 10.3.1 of Method 5 in appendix...

  8. A new concept for a compact tape transport system

    International Nuclear Information System (INIS)

    Mlekodaj, R.L.; Zganjar, E.F.; Cole, J.D.

    1981-01-01

    A new concept in tape transport systems for the collection and counting of radioactive samples from an on-line isotope separator has been developed. This new compact design was motivated by space limitations but important additional improvements over previous designs were made in cost, simplicity and vacuum quality. The system is based on a continuous loop of 6.5 mm wide recording tape 116 m long with a conducting coating on one side for beam current monitoring. One small stepping motor is required for operation. (orig.)

  9. A Concept of Operations for an Integrated Vehicle Health Assurance System

    Science.gov (United States)

    Hunter, Gary W.; Ross, Richard W.; Berger, David E.; Lekki, John D.; Mah, Robert W.; Perey, Danie F.; Schuet, Stefan R.; Simon, Donald L.; Smith, Stephen W.

    2013-01-01

    This document describes a Concept of Operations (ConOps) for an Integrated Vehicle Health Assurance System (IVHAS). This ConOps is associated with the Maintain Vehicle Safety (MVS) between Major Inspections Technical Challenge in the Vehicle Systems Safety Technologies (VSST) Project within NASA s Aviation Safety Program. In particular, this document seeks to describe an integrated system concept for vehicle health assurance that integrates ground-based inspection and repair information with in-flight measurement data for airframe, propulsion, and avionics subsystems. The MVS Technical Challenge intends to maintain vehicle safety between major inspections by developing and demonstrating new integrated health management and failure prevention technologies to assure the integrity of vehicle systems between major inspection intervals and maintain vehicle state awareness during flight. The approach provided by this ConOps is intended to help optimize technology selection and development, as well as allow the initial integration and demonstration of these subsystem technologies over the 5 year span of the VSST program, and serve as a guideline for developing IVHAS technologies under the Aviation Safety Program within the next 5 to 15 years. A long-term vision of IVHAS is provided to describe a basic roadmap for more intelligent and autonomous vehicle systems.

  10. Computer-aided acquisition and logistics support (CALS): Concept of Operations for Depot Maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Bourgeois, N.C.; Greer, D.K.

    1993-04-01

    This CALS Concept of Operations for Depot Maintenance provides the foundation strategy and the near term tactical plan for CALS implementation in the depot maintenance environment. The user requirements enumerated and the overarching architecture outlined serve as the primary framework for implementation planning. The seamless integration of depot maintenance business processes and supporting information systems with the emerging global CALS environment will be critical to the efficient realization of depot user's information requirements, and as, such will be a fundamental theme in depot implementations.

  11. Concept of Operations : SeaTA-Enhanced Travel Time Estimates and Traffic Management Practices for the St. Lawrence Seaway

    Science.gov (United States)

    2017-10-16

    This Concept of Operations (ConOps) is the final installment in a series of three reports focused on identifying opportunities for the application of Intelligent Transportation System (ITS) technologyor equivalentwithin the maritime transportat...

  12. Intra-operative monitoring of the common peroneal nerve during total knee replacement.

    Science.gov (United States)

    Unwin, A J; Thomas, M

    1994-01-01

    We present a method allowing intra-operative monitoring of the common peroneal nerve during total knee arthroplasty using a magnetic stimulator. Previous reports have shown no pre-operative method successful in selecting those patients prone to develop a post-operative palsy. The device, placed beneath the lumbar spine, stimulates the cauda equina; common peroneal nerve function is assessed via the response in extensor digitorum brevis. There is a loss of signal from the nerve with the use of a tourniquet 25 min following its application. The protocol therefore requires that a tourniquet is used at least only for fixation of the prosthetic components. The method is quick, safe, non-invasive and reproducible, and is of use both in at-risk patients and in research work. Images Figure 6. PMID:7837197

  13. Japanese contributions to IAEA INTOR workshop, phase two A, part 2, chapter XI: concept evolution, chapter XII: design concept, and chapter XIII: operation and test programme

    International Nuclear Information System (INIS)

    Tomabechi, Ken; Fujisawa, Noboru; Iida, Hiromasa

    1985-07-01

    This report corresponds to Chapters XI, XII, and XIII of Japanese contribution report to IAEA INTOR Workship, Phase Two A, Part 2. In the phase Two A, Part 2 workshop, we have studied critical technical issues and have also assessed scientific and technical data bases. Based on those results, the INTOR design have been modified to upgrade the design concept. The major modification items are related to plasma beta value, plasma operation scenario, reactor size reduction, neutron fluence, tritium producing blanket, and implementation of active control coils. In those chapters, the concept evolution for the design modification and main results are described. (author)

  14. The SARVIEWS Project: Automated SAR Processing in Support of Operational Near Real-time Volcano Monitoring

    Science.gov (United States)

    Meyer, F. J.; Webley, P. W.; Dehn, J.; Arko, S. A.; McAlpin, D. B.; Gong, W.

    2016-12-01

    Volcanic eruptions are among the most significant hazards to human society, capable of triggering natural disasters on regional to global scales. In the last decade, remote sensing has become established in operational volcano monitoring. Centers like the Alaska Volcano Observatory rely heavily on remote sensing data from optical and thermal sensors to provide time-critical hazard information. Despite this high use of remote sensing data, the presence of clouds and a dependence on solar illumination often limit their impact on decision making. Synthetic Aperture Radar (SAR) systems are widely considered superior to optical sensors in operational monitoring situations, due to their weather and illumination independence. Still, the contribution of SAR to operational volcano monitoring has been limited in the past due to high data costs, long processing times, and low temporal sampling rates of most SAR systems. In this study, we introduce the automatic SAR processing system SARVIEWS, whose advanced data analysis and data integration techniques allow, for the first time, a meaningful integration of SAR into operational monitoring systems. We will introduce the SARVIEWS database interface that allows for automatic, rapid, and seamless access to the data holdings of the Alaska Satellite Facility. We will also present a set of processing techniques designed to automatically generate a set of SAR-based hazard products (e.g. change detection maps, interferograms, geocoded images). The techniques take advantage of modern signal processing and radiometric normalization schemes, enabling the combination of data from different geometries. Finally, we will show how SAR-based hazard information is integrated in existing multi-sensor decision support tools to enable joint hazard analysis with data from optical and thermal sensors. We will showcase the SAR processing system using a set of recent natural disasters (both earthquakes and volcanic eruptions) to demonstrate its

  15. Development of Advanced Monitoring System with Reactor Neutrino Detection Technique for Verification of Reactor Operations

    International Nuclear Information System (INIS)

    Furuta, H.; Tadokoro, H.; Imura, A.; Furuta, Y.; Suekane, F.

    2010-01-01

    Recently, technique of Gadolinium-loaded liquid scintillator (Gd-LS) for reactor neutrino oscillation experiments has attracted attention as a monitor of reactor operation and ''nuclear Gain (GA)'' for IAEA safeguards. When the thermal operation power is known, it is, in principle, possible to non-destructively measure the ratio of Pu/U in reactor fuel under operation from the reactor neutrino flux. An experimental program led by Lawrence Livermore National Laboratory and Sandia National Laboratories in USA has already demonstrated feasibility of the reactor monitoring by neutrinos at San Onofre Nuclear Power Station, and the Pu monitoring by neutrino detection is recognized as a candidate of novel technology to detect undeclared operation of reactor. However, further R and D studies of detector design and materials are still necessary to realize compact and mobile detector for practical use of neutrino detector. Considering the neutrino interaction cross-section and compact detector size, the detector must be set at a short distance (a few tens of meters) from reactor core to accumulate enough statistics for monitoring. In addition, although previous reactor neutrino experiments were performed at underground to reduce cosmic ray muon background, feasibility of the measurement at ground level is required for the monitor considering limited access to the reactor site. Therefore, the detector must be designed to be able to reduce external backgrounds extremely without huge shields at ground level, eg. cosmic ray muons and fast neutrons. We constructed a 0.76 ton Gd-LS detector, and carried out a reactor neutrino measurement at the experimental fast reactor JOYO in 2007. The neutrino detector was set up at 24.3m away from the reactor core at the ground level, and we understood the property of the main background; the cosmic-ray induced fast neutron, well. Based on the experience, we are constructing a new detector for the next experiment. The detector is a Gd

  16. Strategy-oriented display concept to assist severe accident management

    International Nuclear Information System (INIS)

    Jeong, Kwangsub; Ha, Jaejoo

    2000-01-01

    The Critical Function Monitoring System (CFMS) is a typical Safety Parameter Display System (SPDS) to assist the operation of Korean Standard Nuclear Power Plants during normal and emergency operation, and SPDS for severe accident is being developed in Korea. When the existing CFMS is used under a severe accident situation, some problems are expected from: (1) different design basis, i.e. prevention of core melt vs. protection of radiation release to environment, (2) different parameters for decision-making, and (3) different domain and depth of information to restore the plant. To resolve the above problems, a concept, 'Strategy-Oriented Information Display' concept, for displaying information for severe accident management is developed in this paper. Whereas the existing SPDS structure is based on the critical safety function, the developed concept is based on the severe accident management strategy. The display for each strategy includes the plant parameters to check the status of plant and component with the logical or graphical views necessary for executing the strategy. As the application of the proposed concept, KAERI is developing a display system, the prototype severe accident SPDS, Severe Accident Management Display System (SAMDIS), to assist plant personnel for executing Korean Severe Accident Management Guidelines. CFMS is developed for a general display suitable to all situations with various displays. On the contrary, SAMDIS provides all the relevant information on one screen based on the proposed concept. The SAMDIS screen shows more extensive area than CFMS and thus plant personnel can recognize the overall plant status at a glance. This concept is quite effective when used with severe accident management guidelines because of the relatively macroscopic characteristics of a severe accident management strategy. (author)

  17. Design concepts for an integrated control room used as a site-wide operations facility

    International Nuclear Information System (INIS)

    Simon, B.H.; Raghavan, R.; Ujita, H.; Utena, S.; Sakuma, A.; Itoh, T.; Fukura, M.; Ono, I.

    1995-01-01

    The concept of an Integrated Main Control Room (IMCR) evolved from surveys conducted by Tokyo Electric Power Company (TEPCO) with plant managers and workers as their existing GE-type boiling water reactors (BWRs) on the need for improved operating conditions in a new generation of reactors being developed for the next century (around 2010). These reactors will be a further enhancement of the advanced boiling water reactors (ABWRs) now being constructed at the Kashiwazaki-Kariwa site in Japan (no.6 and no.7). TEPCO also saw a need for new thinking on control room design because of projected social conditions in Japan for the 21st century. These projections forecast a smaller number of skilled engineering graduates and those graduates less willing to work in nuclear power because such work is seen as unappealing, conducted in remote geographical locations, and requiring extensive night duty. As one solution to reducing operator burden and decreasing the night shift staff, while making nuclear plant operation more interesting for the operators and reducing labor and construction costs, the IMCR was conceived. (author)

  18. Westinghouse Hanford Company operational environmental monitoring annual report, calendar year 1994

    Energy Technology Data Exchange (ETDEWEB)

    Schmidt, J.; Fassett, J.W.; Johnson, A.R.; Johnson, V.G.; Markes, B.M.; McKinney, S.M.; Moss, K.J.; Perkins, C.J.; Richterich, L.R.

    1995-08-01

    This document presents the results of the Westinghouse Hanford Company near-facility operational environmental monitoring for 1994 in the 100, 200/600, and 300/400 Areas of the Hanford Site, in south-central Washington State. Surveillance activities included sampling and analyses of ambient air surface water, groundwater, soil, sediments, and biota. Also, external radiation measurements and radiological surveys were taken at waste disposal sites, radiologically controlled areas, and roads. These activities were conducted to assess and control the effects of nuclear facilities and waste sites on the local environment. In addition, diffuse sources were monitored to determine compliance with Federal, State, and/or local regulations. In general, although effects from nuclear facilities are still seen on the Hanford Site and radiation levels are slightly elevated when compared to offsite locations, the differences are less than in previous years.

  19. Westinghouse Hanford Company operational environmental monitoring annual report - calendar year 1995

    Energy Technology Data Exchange (ETDEWEB)

    Schmidt, J.W., Westinghouse Hanford

    1996-07-30

    This document summarizes the results of the Westinghouse Hanford Company (WHC) near-facility operational environmental monitoring for 1995 in the 100, 200/600, and 300/400 Areas of the Hanford Site, in south-central Washington State. Surveillance activities included sampling and analyses of ambient air, surface water,groundwater, soil, sediments, and biota. Also, external radiation measurements and radiological surveys were taken at waste disposal sites, radiologically controlled areas, and roads. These activities were conducted to assess and control the effects of nuclear facilities and waste sites on the local environment. In addition, diffuse sources were monitored to determine compliance with Federal, State, and/or local regulations. In general, although effects from nuclear facilities can still be observed on the Hanford Site and radiation levels are slightly elevated when compared to offsite locations, the differences are less than in previous years.

  20. RFID Technology for Continuous Monitoring of Physiological Signals in Small Animals.

    Science.gov (United States)

    Volk, Tobias; Gorbey, Stefan; Bhattacharyya, Mayukh; Gruenwald, Waldemar; Lemmer, Björn; Reindl, Leonhard M; Stieglitz, Thomas; Jansen, Dirk

    2015-02-01

    Telemetry systems enable researchers to continuously monitor physiological signals in unrestrained, freely moving small rodents. Drawbacks of common systems are limited operation time, the need to house the animals separately, and the necessity of a stable communication link. Furthermore, the costs of the typically proprietary telemetry systems reduce the acceptance. The aim of this paper is to introduce a low-cost telemetry system based on common radio frequency identification technology optimized for battery-independent operational time, good reusability, and flexibility. The presented implant is equipped with sensors to measure electrocardiogram, arterial blood pressure, and body temperature. The biological signals are transmitted as digital data streams. The device is able of monitoring several freely moving animals housed in groups with a single reader station. The modular concept of the system significantly reduces the costs to monitor multiple physiological functions and refining procedures in preclinical research.

  1. Recent developments in water quality monitoring for Space Station reclaimed wastewaters

    Science.gov (United States)

    Small, John W.; Verostko, Charles E.; Linton, Arthur T.; Burchett, Ray

    1987-01-01

    This paper discusses the recent developments in water quality monitoring for Space Station reclaimed wastewaters. A preprototype unit that contains an ultraviolet absorbance organic carbon monitor integrated with pH and conductivity sensors is presented. The preprototype has provisions for automated operation and is a reagentless flow-through system without any gas/liquid interfaces. The organic carbon monitor detects by utraviolet absorbance the organic impurities in reclaimed wastewater which may be correlated to the organic carbon content of the water. A comparison of the preprototype organic carbon detection values with actual total organic carbon measurements is presented. The electrolyte double junction concept for the pH sensor and fixed electrodes for both the pH and conductivity sensors are discussed. In addition, the development of a reagentless organic carbon analyzer that incorporates ultraviolet oxidation and infrared detection is presented. Detection sensitivities, hardware development, and operation are included.

  2. Controlling operational risk: Concepts and practices

    NARCIS (Netherlands)

    van den Tillaart, A.H.A.J.

    2003-01-01

    The subject of this thesis is controlling 'operational risk' in banks. Operational risk is defined as the risk of losses resulting from inadequate or failed internal processes, people, systems, or from external events. Within this very broad subject, we focus on the place of operational risk

  3. Remote support services using condition monitoring and online sensor data for offshore oilfield

    OpenAIRE

    Du, Baoli

    2013-01-01

    Master's thesis in Offshore technology Based on advanced technology in condition monitoring and online sensor data, a new style of operation and maintenance management called remote operation and maintenance support services has been created to improve oil and gas E&P performance. This master thesis will look into how the remote support service is conducted including the concept, design, technology and management philosophies; the current implementation of remote support services in China,...

  4. A study of reactor monitoring method with neural network

    Energy Technology Data Exchange (ETDEWEB)

    Nabeshima, Kunihiko [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    2001-03-01

    The purpose of this study is to investigate the methodology of Nuclear Power Plant (NPP) monitoring with neural networks, which create the plant models by the learning of the past normal operation patterns. The concept of this method is to detect the symptom of small anomalies by monitoring the deviations between the process signals measured from an actual plant and corresponding output signals from the neural network model, which might not be equal if the abnormal operational patterns are presented to the input of the neural network. Auto-associative network, which has same output as inputs, can detect an kind of anomaly condition by using normal operation data only. The monitoring tests of the feedforward neural network with adaptive learning were performed using the PWR plant simulator by which many kinds of anomaly conditions can be easily simulated. The adaptively trained feedforward network could follow the actual plant dynamics and the changes of plant condition, and then find most of the anomalies much earlier than the conventional alarm system during steady state and transient operations. Then the off-line and on-line test results during one year operation at the actual NPP (PWR) showed that the neural network could detect several small anomalies which the operators or the conventional alarm system didn't noticed. Furthermore, the sensitivity analysis suggests that the plant models by neural networks are appropriate. Finally, the simulation results show that the recurrent neural network with feedback connections could successfully model the slow behavior of the reactor dynamics without adaptive learning. Therefore, the recurrent neural network with adaptive learning will be the best choice for the actual reactor monitoring system. (author)

  5. Real time gamma monitoring for employees working in an operational underground copper / uranium mine

    International Nuclear Information System (INIS)

    Lawrence, Cameron E.

    2010-01-01

    For many years electronic devices have been available that are compact enough to utilise for personal gamma radiation monitoring. At BHP Billiton's Olympic Dam underground copper / uranium mine two different types of electronic gamma dosimeters are being used to assess and control exposure to gamma rays present in the underground operations. Canberra Dosicards are being used as part of a program that replaced the use of monthly issued Thermoluminescent Dosimeter (TLD) badges with quarterly issue for some work groups. Two types of Polimaster gamma watches have also been introduced to specific work groups to assist with the determination of sites that may require remedial controls for their level of gamma radiation. To date, both programs have been successfully implemented into the radiation monitoring program for the underground operation and have provided dramatic improvements for the control and determination of sources of gamma radiation in the underground environment.

  6. Assistant Personal Robot (APR: Conception and Application of a Tele-Operated Assisted Living Robot

    Directory of Open Access Journals (Sweden)

    Eduard Clotet

    2016-04-01

    Full Text Available This paper presents the technical description, mechanical design, electronic components, software implementation and possible applications of a tele-operated mobile robot designed as an assisted living tool. This robotic concept has been named Assistant Personal Robot (or APR for short and has been designed as a remotely telecontrolled robotic platform built to provide social and assistive services to elderly people and those with impaired mobility. The APR features a fast high-mobility motion system adapted for tele-operation in plain indoor areas, which incorporates a high-priority collision avoidance procedure. This paper presents the mechanical architecture, electrical fundaments and software implementation required in order to develop the main functionalities of an assistive robot. The APR uses a tablet in order to implement the basic peer-to-peer videoconference and tele-operation control combined with a tactile graphic user interface. The paper also presents the development of some applications proposed in the framework of an assisted living robot.

  7. Advisory expert system for test rig operator

    International Nuclear Information System (INIS)

    Zielczynski, P.

    1994-01-01

    The advisory expert system MAESTRO (Modular Advisory Expert System for Test Rig Operator) has been designed to guide the operator of large experimental installation during start-up, steady state and shut down. The installation is located in the research reactor MARIA in the Institute of Atomic Energy in Swierk, Poland. The system acquires and analyses on line signals from installation and performs two tasks in real time: leading the operator and monitoring of the installation (including signal validation). Systems tasks, architecture and knowledge representation concepts are described. The system is based on expert systems techniques what makes in phases of continuous change of process parameters and it has been achieved by special knowledge representation allowing its dynamical modification. (author). 147 refs, 42 figs, 5 tab

  8. Operational monitoring of the release behaviour of the AVR core

    International Nuclear Information System (INIS)

    Wawrzik, U.; Ivens, G.

    1985-01-01

    The AVR reactor has been used for the mass testing of spherical HTR fuel elements for more than 17 years. To date 14 fuel element types have been used, some of which differ considerably with reference to the heavy metal content, fuel coating and chemical fuel composition. The aim of the measurements at the reactor and of a comprehensive post-irradiation examination programme for fuel elements is to check and evaluate the behaviour of these fuel elements under real reactor conditions. This paper considers only those measurements which are of interest for reactor operation. The integral release behaviour of the fuel elements is continuously monitored by measuring the noble fission gas activity in the primary system. This value is directly determined by the heavy metal contamination. If any significant particle defects occur during operation, these are immediately indicated by a considerable increase in the noble gas activity. The integral release of the solid fission products is monitored by means of filter samples both in the hot and in the cold gas area; this examination, however, is performed intermittently and with a time delay. As these integral measurements only allow one to draw limited conclusions about the behaviour of single fuel element charges or types, they are supplemented by the systematic extraction of fuel elements. These elements are then subjected to standardized annealing tests (KFA) to determine the individual noble gas release, and to examinations of the fuel-free shell to establish the distribution of the solid fission products in it (AVR). The latter method, in particular, has proved to be practicable, as particle defects are detected at an early stadium. During operation to date, only one fuel element charge exhibited incipient particle defects shortly before reaching its final burnup. It was possible to limit the activity release by altering the charging strategy, which resulted in lower fuel element temperatures, and by systematically

  9. RCRA and Operational Monitoring (ROM). Multi-Year Program Plan and Fiscal Year 95 Work Plan WBS 1.5.3

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-17

    This document contains information concerning the RCRA and Operational Monitoring Program at Hanford Reservation. Information presented includes: Schedules for ground water monitoring activities, program cost baseline, program technical baseline, and a program milestone list.

  10. Overview of Cooperative Monitoring Concepts and the CMC

    International Nuclear Information System (INIS)

    Biringer, Kent L.

    1999-01-01

    Cooperative monitoring holds the promise of utilizing many technologies from conflicts of the past to implement agreements of peace in the future. Important approaches to accomplish this are to develop the framework for assessing monitoring opportunities and to provide education and training on the technologies and experience available for sharing with others. The Cooperative Monitoring Center (CMC) at Sandia National Laboratories is working closely with agencies throughout the federal government, academics at home and abroad, and regional organizations to provide the technical tools needed to assess, design, analyze, and implement these cooperative agreements. In doing so, the goals of building regional confidence and increasing trust and communication can be furthered

  11. Condition monitoring of a motor-operated valve using estimated motor torque

    International Nuclear Information System (INIS)

    Chai, Jangbom; Kang, Shinchul; Park, Sungkeun; Hong, Sungyull; Lim, Chanwoo

    2004-01-01

    This paper is concerned with the development of data analysis methods to be used in on-line monitoring and diagnosis of Motor-Operated Valves (MOVs) effectively and accurately. The technique to be utilized includes the electrical measurements and signal processing to estimate electric torque of induction motors, which are attached to most of MOV systems. The estimated torque of an induction motor is compared with the directly measured torque using a torque cell in various loading conditions including the degraded voltage conditions to validate the estimating scheme. The accuracy of the estimating scheme is presented. The advantages of the estimated torque signatures are reviewed over the currently used ones such as the current signature and the power signature in several respects: accuracy, sensitivity, resolution and so on. Additionally, the estimated torque methods are suggested as a good way to monitor the conditions of MOVs with higher accuracy. (author)

  12. Operation and Monitoring of the CMS Regional Calorimeter Trigger Hardware

    CERN Document Server

    Klabbers, P

    2008-01-01

    The electronics for the Regional Calorimeter Trigger (RCT) of the Compact Muon Solenoid Experiment (CMS) have been produced, tested, and installed. The RCT hardware consists of one clock distribution crate and 18 double-sided crates containing custom boards, ASICs, and backplanes. The RCT receives 8-bit energies and a data quality bit from the HCAL and ECAL Trigger Primitive Generators (TPGs) and sends it to the CMS Global Calorimeter Trigger (GCT) after processing. Integration tests with the TPG and GCT subsystems have been successful. Installation is complete and the RCT is integrated into the Level-1 Trigger chain. Data taking has begun using detector noise, cosmic rays, proton-beam debris, and beamhalo muons. The operation and configuration of the RCT is a completely automated process. The tools to monitor, operate, and debug the RCT are mature and will be described in detail, as well as the results from data taking with the RCT.

  13. Application control chart concepts of designing a pre-alarm system in the nuclear power plant control room

    International Nuclear Information System (INIS)

    Hwang, S.-L.; Lin, J.-T.; Liang, G.-F.; Yau, Y.-J.; Yenn, T.-C.; Hsu, C.-C.

    2008-01-01

    This study applied the concepts of the Shewhart control chart to design a pre-alarm system for the nuclear power plant control room. As a support in detecting faults, the pre-alarm system reminded the operators of a change in the system state in its early stages. Two pre-alarm types were designed to compare with the original system, and all participants were requested to monitor each simulated system under both normal and abnormal states. The tasks for the participants included shutting down the reactor, searching for procedures, monitoring system parameters and executing secondary tasks. In each trial, the task performance, mental workload and situation awareness (SA) of the participants were measured. Results indicated that participants had lower mental workload, but equal SA, when monitoring the system with either type of pre-alarm designs, and lower alarm frequency and higher secondary task performance were obtained with the pre-alarm design. Therefore, the pre-alarm system effectively assisted the operators in monitoring tasks

  14. Basis and algorithms applied in modern neutron flux monitoring equipment for WWER. Some results of its operation

    International Nuclear Information System (INIS)

    Alpatov, A. M.; Kamyshan, A. N.; Louzhnov, A. M.; Sokolov, I. V.

    2007-01-01

    The report presents the principle of operation and description of equipment complex for monitoring, control and protection by power, period, reactivity and local parameters of the core of WWER type reactor. The use in NFME of programmed computing means permitted on basis of signals from ex-core neutron detectors of working range, distributed over IC channel height, to realize operative non-inertia monitoring of mean axial power distribution shape in the core and its main characteristics (axial offset and axial non-uniformity coefficient). With regard for this and due to the use of information on position of control banks and on coolant temperature in the reactor vessel downcomer the equipment for power correction, eliminating the influence of the above factors on resulting signal and permitting to increase significantly the accuracy of power monitoring, was designed(Authors)

  15. 40 CFR 60.143 - Monitoring of operations.

    Science.gov (United States)

    2010-07-01

    ... be accurate within ±5 percent of the design water supply pressure. The monitoring device's pressure... follows: (1) A monitoring device for the continuous measurement of the pressure loss through the venturi... accurate within ±250 Pa (±1 inch water). (2) A monitoring device for the continual measurement of the water...

  16. Mechatronics in design of monitoring and diagnostic systems

    Energy Technology Data Exchange (ETDEWEB)

    Uhl, T.; Barszcz, T. [Univ. of Mining and Metallurgy, Krakow (Poland); Hanc, A. [Energocontrol Ltd., Krakow (Poland)

    2003-07-01

    Nowadays development of computer engineering in area of hardware and software gives new possibilities of monitoring and diagnostics system design. The paper presents analysis of new possible solutions for design of monitoring and diagnostic systems including; smart sensor design, modular software design and communication modules. New concept of monitoring system based on home page server solution (nano-server) is presented. Smart sensor design concept with embedded hardware for diagnostic application is shown. New software concept for monitoring and diagnostics automation and examples of applications of new design for condition monitoring based on proposed solution are carefully discussed. (orig.)

  17. In situ radiation test of silicon and diamond detectors operating in superfluid helium and developed for beam loss monitoring

    Science.gov (United States)

    Kurfürst, C.; Dehning, B.; Sapinski, M.; Bartosik, M. R.; Eisel, T.; Fabjan, C.; Rementeria, C. A.; Griesmayer, E.; Eremin, V.; Verbitskaya, E.; Zabrodskii, A.; Fadeeva, N.; Tuboltsev, Y.; Eremin, I.; Egorov, N.; Härkönen, J.; Luukka, P.; Tuominen, E.

    2015-05-01

    As a result of the foreseen increase in the luminosity of the Large Hadron Collider, the discrimination between the collision products and possible magnet quench-provoking beam losses of the primary proton beams is becoming more critical for safe accelerator operation. We report the results of ongoing research efforts targeting the upgrading of the monitoring system by exploiting Beam Loss Monitor detectors based on semiconductors located as close as possible to the superconducting coils of the triplet magnets. In practice, this means that the detectors will have to be immersed in superfluid helium inside the cold mass and operate at 1.9 K. Additionally, the monitoring system is expected to survive 20 years of LHC operation, resulting in an estimated radiation fluence of 1×1016 proton/cm2, which corresponds to a dose of about 2 MGy. In this study, we monitored the signal degradation during the in situ irradiation when silicon and single-crystal diamond detectors were situated in the liquid/superfluid helium and the dependences of the collected charge on fluence and bias voltage were obtained. It is shown that diamond and silicon detectors can operate at 1.9 K after 1×1016 p/cm2 irradiation required for application as BLMs, while the rate of the signal degradation was larger in silicon detectors than in the diamond ones. For Si detectors this rate was controlled mainly by the operational mode, being larger at forward bias voltage.

  18. The International Remote Monitoring Project: Results of the Swedish Nuclear Power Facility field trial

    International Nuclear Information System (INIS)

    Johnson, C.S.; af Ekenstam, G.; Sallstrom, M.

    1995-01-01

    The Swedish Nuclear Power Inspectorate (SKI) and the US Department of Energy (DOE) sponsored work on a Remote Monitoring System (RMS) that was installed in August 1994 at the Barseback Works north of Malmo, Sweden. The RMS was designed to test the front end detection concept that would be used for unattended remote monitoring activities. Front end detection reduces the number of video images recorded and provides additional sensor verification of facility operations. The function of any safeguards Containment and Surveillance (C/S) system is to collect information which primarily is images that verify the operations at a nuclear facility. Barseback is ideal to test the concept of front end detection since most activities of safeguards interest is movement of spent fuel which occurs once a year. The RMS at Barseback uses a network of nodes to collect data from microwave motion detectors placed to detect the entrance and exit of spent fuel casks through a hatch. A video system using digital compression collects digital images and stores them on a hard drive and a digital optical disk. Data and images from the storage area are remotely monitored via telephone from Stockholm, Sweden and Albuquerque, NM, USA. These remote monitoring stations operated by SKI and SNL respectively, can retrieve data and images from the RMS computer at the Barseback Facility. The data and images are encrypted before transmission. This paper presents details of the RMS and test results of this approach to front end detection of safeguard activities

  19. Study on Risk Management in Financing and Operational of Grameen Bank Financing Concept in MBK Finance

    Directory of Open Access Journals (Sweden)

    Bobby Yulandika Putra

    2014-03-01

    Full Text Available Objective – Poverty is one of the most fundamental issues that still surround the life of 29.89 million people of Indonesia (National Statistical Bureau data from January 2, 2012. During this time, the pattern of poverty alleviation programs undertaken by the government is a pattern of generosity. This pattern can directly exacerbate the poor morals and behavior. Ideally, poverty alleviation efforts are made by concrete steps, which empower poor `communities themselves.In line with the theme of this research, one of the financial institutions (non-Banks who cares and has the spirit to empower people to overcome poverty is Mitra Bisnis Keluarga (MBK. This study aimed to assess the financial risks and operational risks of implementation of Grameen Bank financing concept in MBK.Methods - The method used in this research is literature review and qualitative descriptive study using actual MBK data.Results - Results from this research showed that products with the concept of Grameen Bank financing is relatively safe in the terms of the financing risk, but requires more attention on operational risk and which can be implemented for large-scale poverty alleviation program.Conclusion - The data showed that the risk of financing given to the poor (without collateral is minimal and MBK actual data shows that the Operational self-sufficiency is relatively high at> 90% Keywords : MBK, Grameen Bank, Poverty

  20. In-operation inspection technology development-4 ''development of degradation prediction technology for motor-operated valves''

    International Nuclear Information System (INIS)

    Kikuo, Takeshima; Yuichi, Higashikawa; Masahiro, Koike; Kenji, Matsumoto; Eiji, O'shima

    2001-01-01

    A method for degradation predicting technology has been proposed for motor operated valves in nuclear power plants which is based on the concept of condition monitoring for maintenance. This method (degradation prediction technology) eliminates the unnecessary overhaul of valves and realizes high reliability and economy. The degradation mechanism was clarified by long time heating experiments of gasket and gland packing and the wear test for them and stem nut to research valve parts degradation by stress (pressure, temperature, etc) during plant operation. Effective electric power measurements for motor operated valves were confirmed to be useful discovering valve part failures. The motor operated valve degradation prediction system was developed on the basis of the experiment results and mechanism. The system is able to predict the degradation of valve parts (gasket/gland packing, stem, stem nut, etc) utilizing plant data (pressure, temperature, etc) and effective power of the motor. The life of valve parts can be estimated from the experimental results. (authors)