WorldWideScience

Sample records for operations control centers

  1. Intelligent tutors for control center operator training

    Energy Technology Data Exchange (ETDEWEB)

    Vale, Z.A. [Porto Univ. (Portugal). Dept. of Electrical and Computer Engineering; Fernandes, M.F.; Marques, A. [Electricity of Portugal, Sacavem (Portugal)

    1995-12-31

    Power systems are presently remotely operated and controlled from control centers that receive on-line information about the power system state. Control center operators have very high-demanding tasks what makes their training a key issue for the performance of the whole power system. Simulators are usually used by electrical utilities for this purpose but they are very expensive applications and their use requires the preparation of the training sessions by qualified training staff which is a very time consuming task. Due to this, these simulators are only used a few times a year. Intelligent Tutoring Systems (ITS) provide some new possibilities for control center operator training making easier its use without much assistance of the teaching staff. On the other hand, an expert system in use in a control center can be adapted to an ITS to train operators without much effort. 18 refs

  2. Trainer module for security control center operations

    International Nuclear Information System (INIS)

    Bernard, E.A.

    1982-01-01

    An operator trainer module has been developed to be used with the security control center equipment to be installed as part of a safeguards physical protection system. The module is designed to provide improved training and testing capabilities for control center operators through the use of simulations for perimeter equipment operations. Operators, through the trainer module, can be challenged with a variety of realistic situations which require responsive action identical to that needed in an actual system. This permits a consistent evaluation and confirmation of operator capabilities prior to assignment as an operator and allows for periodic retesting to verify that adequate performance levels are maintained

  3. CNC Turning Center Advanced Operations. Computer Numerical Control Operator/Programmer. 444-332.

    Science.gov (United States)

    Skowronski, Steven D.; Tatum, Kenneth

    This student guide provides materials for a course designed to introduce the student to the operations and functions of a two-axis computer numerical control (CNC) turning center. The course consists of seven units. Unit 1 presents course expectations and syllabus, covers safety precautions, and describes the CNC turning center components, CNC…

  4. Transportable Payload Operations Control Center reusable software: Building blocks for quality ground data systems

    Science.gov (United States)

    Mahmot, Ron; Koslosky, John T.; Beach, Edward; Schwarz, Barbara

    1994-01-01

    The Mission Operations Division (MOD) at Goddard Space Flight Center builds Mission Operations Centers which are used by Flight Operations Teams to monitor and control satellites. Reducing system life cycle costs through software reuse has always been a priority of the MOD. The MOD's Transportable Payload Operations Control Center development team established an extensive library of 14 subsystems with over 100,000 delivered source instructions of reusable, generic software components. Nine TPOCC-based control centers to date support 11 satellites and achieved an average software reuse level of more than 75 percent. This paper shares experiences of how the TPOCC building blocks were developed and how building block developer's, mission development teams, and users are all part of the process.

  5. Increasing the operational efficiency and safety in operation control centers: the TRANSPETRO experience; Aumentando a seguranca e eficiencia operacional em centros de controle: a experiencia da TRANSPETRO

    Energy Technology Data Exchange (ETDEWEB)

    Felicio, Marco Aurelio Fierro; Frisoli, Caetano [PETROBRAS Transporte S.A. (TRANSPETRO), Rio de Janeiro, RJ (Brazil)

    2009-12-19

    The increase in operational efficiency and safety in operation control centers has been traditionally obtained through direct actions in the operational activity itself and on the resources and systems used for that. Modern supervisory and control systems, sophisticated simulation software, cutting-edge last generation equipment and installations, clear and comprehensive procedures definitions and intensive and constant training of the operation teams are, usually, the chosen paths followed by control centers in their incessant quest for increased operational efficiency and safety. This paper presents the path followed by the TRANSPETRO's National Operational Control Center - Natural Gas (Centro Nacional de Controle Operacional - CNCO-Gas) - that has not only focused with the traditional aspects above, but has also made intensive investments in systems and data base integrations, aiming at eliminating data inconsistencies and redundancies and at including automation, standardization and systematization of non-operational and complementary operational activities. These investments allowed TRANSPETRO CNCO-Gas face the big challenge of growing that TRANSPETRO's gas transportation activity is facing now and will be facing in the near future: from 2,600 km to 7,000 km of gas pipelines, and a volume of transported natural gas from 35 MMm{sup 3}/day to 100 MMm{sup 3}/day. (author)

  6. Operator-centered control of a semi-autonomous industrial robot

    International Nuclear Information System (INIS)

    Spelt, P.F.; Jones, S.L.

    1994-01-01

    This paper presents work done by Oak Ridge National Laboratory and Remotec, Inc., to develop a new operator-centered control system for Remotec's Andros telerobot. Andros robots are presently used by numerous electric utilities, the armed forces, and numerous law enforcement agencies to perform tasks which are hazardous for human operators. This project has automated task components and enhanced the video graphics display of the robot's position in the environment to significantly reduce operator workload. The procedure of automating a telerobot requires the addition of computer power to the robot, along with a variety of sensors and encoders to provide information about the robots performance in and relationship to its environment The resulting vehicle serves as a platform for research on strategies to integrate automated tasks with those performed by a human operator. The addition of these capabilities will greatly enhance the safety and efficiency of performance in hazardous environments

  7. Launch Vehicle Control Center Architectures

    Science.gov (United States)

    Watson, Michael D.; Epps, Amy; Woodruff, Van; Vachon, Michael Jacob; Monreal, Julio; Williams, Randall; McLaughlin, Tom

    2014-01-01

    This analysis is a survey of control center architectures of the NASA Space Launch System (SLS), United Launch Alliance (ULA) Atlas V and Delta IV, and the European Space Agency (ESA) Ariane 5. Each of these control center architectures have similarities in basic structure, and differences in functional distribution of responsibilities for the phases of operations: (a) Launch vehicles in the international community vary greatly in configuration and process; (b) Each launch site has a unique processing flow based on the specific configurations; (c) Launch and flight operations are managed through a set of control centers associated with each launch site, however the flight operations may be a different control center than the launch center; and (d) The engineering support centers are primarily located at the design center with a small engineering support team at the launch site.

  8. Using Web 2.0 (and Beyond?) in Space Flight Operations Control Centers

    Science.gov (United States)

    Scott, David W.

    2010-01-01

    Word processing was one of the earliest uses for small workstations, but we quickly learned that desktop computers were far more than e-typewriters. Similarly, "Web 2.0" capabilities, particularly advanced search engines, chats, wikis, blogs, social networking, and the like, offer tools that could significantly improve our efficiency at managing the avalanche of information and decisions needed to operate space vehicles in realtime. However, could does not necessarily equal should. We must wield two-edged swords carefully to avoid stabbing ourselves. This paper examines some Web 2.0 tools, with an emphasis on social media, and suggests which ones might be useful or harmful in real-time space operations co rnotl environments, based on the author s experience as a Payload Crew Communicator (PAYCOM) at Marshall Space Flight Center s (MSFC) Payload Operations Integration Center (POIC) for the International Space Station (ISS) and on discussions with other space flight operations control organizations and centers. There is also some discussion of an offering or two that may come from beyond the current cyber-horizon.

  9. Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

    Science.gov (United States)

    Dudley, Stephanie R. B.; Marsh, Angela L.

    2014-01-01

    With an increase in utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four-month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS real-time operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art Video Wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of

  10. Gravity Plant Physiology Facility (GPPF) Team in the Spacelab Payload Operations Control Center (SL

    Science.gov (United States)

    1992-01-01

    The primary payload for Space Shuttle Mission STS-42, launched January 22, 1992, was the International Microgravity Laboratory-1 (IML-1), a pressurized manned Spacelab module. The goal of IML-1 was to explore in depth the complex effects of weightlessness of living organisms and materials processing. Around-the-clock research was performed on the human nervous system's adaptation to low gravity and effects of microgravity on other life forms such as shrimp eggs, lentil seedlings, fruit fly eggs, and bacteria. Materials processing experiments were also conducted, including crystal growth from a variety of substances such as enzymes, mercury iodide, and a virus. The Huntsville Operations Support Center (HOSC) Spacelab Payload Operations Control Center (SL POCC) at the Marshall Space Flight Center (MSFC) was the air/ground communication channel used between the astronauts and ground control teams during the Spacelab missions. Featured is the Gravity Plant Physiology Facility (GPPF) team in the SL POCC during the IML-1 mission.

  11. Critical Point Facility (CPE) Group in the Spacelab Payload Operations Control Center (SL POCC)

    Science.gov (United States)

    1992-01-01

    The primary payload for Space Shuttle Mission STS-42, launched January 22, 1992, was the International Microgravity Laboratory-1 (IML-1), a pressurized manned Spacelab module. The goal of IML-1 was to explore in depth the complex effects of weightlessness of living organisms and materials processing. Around-the-clock research was performed on the human nervous system's adaptation to low gravity and effects of microgravity on other life forms such as shrimp eggs, lentil seedlings, fruit fly eggs, and bacteria. Materials processing experiments were also conducted, including crystal growth from a variety of substances such as enzymes, mercury iodide, and a virus. The Huntsville Operations Support Center (HOSC) Spacelab Payload Operations Control Center (SL POCC) at the Marshall Space Flight Center (MSFC) was the air/ground communication channel used between the astronauts and ground control teams during the Spacelab missions. Featured is the Critical Point Facility (CPE) group in the SL POCC during STS-42, IML-1 mission.

  12. Assessment of operators' mental workload using physiological and subjective measures in cement, city traffic and power plant control centers.

    Science.gov (United States)

    Fallahi, Majid; Motamedzade, Majid; Heidarimoghadam, Rashid; Soltanian, Ali Reza; Miyake, Shinji

    2016-01-01

    The present study aimed to evaluate the operators' mental workload (MW) of cement, city traffic control and power plant control centers using subjective and objective measures during system vital parameters monitoring. This cross-sectional study was conducted from June 2014 to February 2015 at the cement, city traffic control and power plant control centers. Electrocardiography and electroencephalography data were recorded from forty males during performing their daily working in resting, low mental workload (LMW), high mental workload (HMW) and recovery conditions (each block 5 minutes). The NASA-Task Load Index (TLX) was used to evaluate the subjective workload of the operators. The results showed that increasing MW had a significant effect on the operators subjective responses in two conditions ([1,53] = 216.303, P < 0.001, η2 = 0.803). Also,the Task-MW interaction effect on operators subjective responses was significant (F [3, 53] = 12.628,P < 0.001, η2 = 0.417). Analysis of repeated measures analysis of variance (ANOVA) indicated that increasing mental demands had a significant effect on heart rate, low frequency/high frequency ratio, theta and alpha band activity. The results suggested that when operators' mental demands especially in traffic control and power plant tasks increased, their mental fatigue and stress level increased and their mental health deteriorated. Therefore, it may be necessary to implement an ergonomic program or administrative control to manage mental probably health in these control centers. Furthermore, by evaluating MW, the control center director can organize the human resources for each MW condition to sustain the appropriate performance as well as improve system functions.

  13. Human factors review of electric power dispatch control centers. Volume 4. Operator information needs. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Miller, R.J.; Najaf-Zadeh, K.; Darlington, H.T.; McNair, H.D.; Seidenstein, S.; Williams, A.R.

    1982-10-01

    Human factors is a systems-oriented interdisciplinary specialty concerned with the design of systems, equipment, facilities and the operational environment. An important aspect leading to the design requirements is the determination of the information requirements for electric power dispatch control centers. There are significant differences between the system operator's actions during normal and degraded states of power system operation, and power system restoration. This project evaluated the information the operator requires for normal power system and control system operations and investigates the changes of information required by the operator as the power system and/or the control system degrades from a normal operating state. The Phase II study, published in two volumes, defines power system states and control system conditions to which operator information content can be related. This volume presents detailed data concerning operator information needs that identify the needs for and the uses of power system information by a system operator in conditions ranging from normal through degraded operation. The study defines power system states and control system conditions to which operator information content can be related, and it identifies the requisite information as consistent with current industry practice so as to aid control system designers. Training requirements are also included for planning entry-level and follow-on training for operators.

  14. A knowledge-centered paradigm for operations and design

    International Nuclear Information System (INIS)

    Perin, C.

    2005-01-01

    A paradigm premised on the reactor design basis and on its systems, structures, and components also governs nuclear power plant operations. This machine-centered paradigm emphasizes a functional and discipline-based division of responsibilities, which can create hierarchical 'silos' and 'stovepipes' inhibiting the development and lateral exchange of knowledge about safety-critical system interactions. A knowledge-centered paradigm instead encourages the timely development, analysis, and exchange of information about system conditions and their likely consequences. This new paradigm puts operational focus on the importance of operating experience, informative root cause analyses, effective corrective actions, and cross-discipline exchange and cooperation. Although the knowledge-centered paradigm is already central to three main strategies of risk reduction, it is less likely to be recognized as such in terms of priorities, resources, and training: configuration control, control room operations, and root cause analysis. To maintain the capacity for safe shutdown and to preserve public trust, the knowledge-centered paradigm places as high a priority on interactions of safety-critical knowledge as it does on interactions of safety-critical systems, structures, and components. (author)

  15. Human factors review of electric power dispatch control centers. Volume 3. Operator information needs summary. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Miller, R.J.; Najaf-Zadeh, K.; Darlington, H.T.; McNair, H.D.; Seidenstein, S.; Williams, A.R.

    1982-10-01

    Human factors is a systems-oriented interdisciplinary specialty concerned with the design of systems, equipment, facilities and the operational environment. An important aspect leading to the design requirements is the determination of the information requirements for electric power dispatch control centers. There are significant differences between the system operator's actions during normal and degraded states of power system operation, and power system restoration. This project evaluated the information the operator requires for normal power system and control system operations and investigates the changes of information required by the operator as the power system and/or the control system degrades from a normal operating state. The Phase II study, published in two volumes, defines power system states and control system conditions to which operator information content can be related. This volume presents a summary of operator information needs, identifying the needs for and the uses of power system information by a system operator in conditions ranging from normal through degraded operation. Training requirements are also included for planning entry-level and follow-on training for operators.

  16. A Comparison of the Views of Internal Controllers/Auditors and Branch/Call Center Personnel of the Banks for Operational Risk: A Case for Turkish Banking Sector

    Directory of Open Access Journals (Sweden)

    Sinemis Zengin

    2016-10-01

    Full Text Available The aim of this paper is to compare the views of internal controllers/auditors and branch/call center personnel of the banks with respect to the operational risk. Within this scope, we made two different surveys to the personnel in Turkish banks in order to achieve this objective. The first survey was conducted by 310 branch and call center personnel whereas 151 personnel in internal control and audit departments of the banks carried out the second survey. The major finding in this study is that there is a difference in the views of these two groups regarding the evaluation of operational risk. In general, internal controllers/auditors look at the operational risk more negatively than branch/call center personnel. The personnel who control and audit operations in the bank think that operational risk knowledge level of branch/call center personnel is less sufficient, operational risk levels are higher, the controls to avoid this risk are less efficient than branch/call center personnel consider.

  17. An advanced automation system for operation of Sao Paulo pumping stations from TRANSPETRO Master Control Center - CNCO

    Energy Technology Data Exchange (ETDEWEB)

    Corcioli, Mario Sergio; Barreto, Camila Maria Benevenuto [TRANSPETRO, Rio de Janeiro, RJ (Brazil)

    2009-07-01

    Since 2000 the operations of the TRANSPETRO pumping stations in the state of Sao Paulo region began to be transferred from local control centers located at the transfer and storage terminals to the National Operational Control Center (CNCO) of TRANSPETRO, located at the headquarters of the company, in Rio de Janeiro. The proposed paper aims to presenting an overview of the automation system that was developed to enable such pumping stations to be operated from CNCO in a reliable and secure manner, focusing on tools that offer an embedded system alarms completely free of false alarms with automatic determining of the root cause, and also automatic and advanced diagnoses of problems caused by failures of hardware, human error and abnormal conditions of the process, providing the CNCO SCADA system of accurate and quality information that help operators to make decisions. The referred automation system was integrated for the first time to CNCO SCADA system in 2000, for pipeline pumps of Osvat (Sao Sebastiao - Vale do Paraiba pipeline) station at the Sao Sebastiao Terminal - northern coast of Sao Paulo region. (author)

  18. Customizing graphical user interface technology for spacecraft control centers

    Science.gov (United States)

    Beach, Edward; Giancola, Peter; Gibson, Steven; Mahmot, Ronald

    1993-01-01

    The Transportable Payload Operations Control Center (TPOCC) project is applying the latest in graphical user interface technology to the spacecraft control center environment. This project of the Mission Operations Division's (MOD) Control Center Systems Branch (CCSB) at NASA Goddard Space Flight Center (GSFC) has developed an architecture for control centers which makes use of a distributed processing approach and the latest in Unix workstation technology. The TPOCC project is committed to following industry standards and using commercial off-the-shelf (COTS) hardware and software components wherever possible to reduce development costs and to improve operational support. TPOCC's most successful use of commercial software products and standards has been in the development of its graphical user interface. This paper describes TPOCC's successful use and customization of four separate layers of commercial software products to create a flexible and powerful user interface that is uniquely suited to spacecraft monitoring and control.

  19. Crew-Centered Operations: What HAL 9000 Should Have Been

    Science.gov (United States)

    Korsmeyer, David J.; Clancy, Daniel J.; Crawford, James M.; Drummond, Mark E.

    2005-01-01

    To date, manned space flight has maintained the locus of control for the mission on the ground. Mission control performs tasks such as activity planning, system health management, resource allocation, and astronaut health monitoring. Future exploration missions require the locus of control to shift to on-board due light speed constraints and potential loss of communication. The lunar campaign must begin to utilize a shared control approach to validate and understand the limitations of the technology allowing astronauts to oversee and direct aspects of operation that require timely decision making. Crew-centered Operations require a system-level approach that integrates multiple technologies together to allow a crew-prime concept of operations. This paper will provide an overview of the driving mission requirements, highlighting the limitations of existing approaches to mission operations and identifying the critical technologies necessary to enable a crew-centered mode of operations. The paper will focus on the requirements, trade spaces, and concepts for fulfillment of this capability. The paper will provide a broad overview of relevant technologies including: Activity Planning and Scheduling; System Monitoring; Repair and Recovery; Crew Work Practices.

  20. Volume totalizers analysis of pipelines operated by TRANSPETRO National Operational Control Center; Analise de totalizadores de volume em oleodutos operados pelo Centro Nacional de Controle e Operacao da TRANSPETRO

    Energy Technology Data Exchange (ETDEWEB)

    Aramaki, Thiago Lessa; Montalvao, Antonio Filipe Falcao [Petrobras Transporte S.A. (TRANSPETRO), Rio de Janeiro, RJ (Brazil); Marques, Thais Carrijo [Universidade do Estado do Rio de Janeiro (UERJ), RJ (Brazil)

    2012-07-01

    This paper aims to present the results and methodology in the analysis of differences in volume totals used in systems such as batch tracking and leak detection of pipelines operated by the National Center for Operational Control (CNCO) at TRANSPETRO. In order to optimize this type of analysis, software was developed to acquisition and processing of historical data using the methodology developed. The methodology developed takes into account the particularities encountered in systems operated by TRANSPETRO, more specifically, by CNCO. (author)

  1. Report on the Audit of the Acquisition of the Tactical Air Operations Center/Modular Control Equipment

    Science.gov (United States)

    1991-06-06

    This is our final report on the Audit of the Acquisition of the Tactical Air Operations Center/Modular Control Equipment (TAOC/MCE) for your...matters of concern that could affect the acquisition of the TAOC/MCE. We performed the audit from March through December 1990. The audit objective was...controls related to the audit objectives. The audit was made in accordance with the Inspector General’s critical program management element approach

  2. New Emergency control center of Slovenske Elektrarne Bohunice NPP

    International Nuclear Information System (INIS)

    Pecko, E.

    2012-01-01

    Emergency preparedness of nuclear power plant and operation assurance in case of a possible emergency calls to have devices for emergency response with equipment for rapid detection and continuous evaluation of anticipated events. Chief executive body designated to manage a nuclear power plant during major events is the emergency committee (EC). Emergency Committee is a part of the Emergency Response Organization (ERO). The following centers are on alert to ensure the activities of the ERO - Emergency Response office: - control room (CR) and emergency control room (ECR); - emergency management center (EMC); - Monitoring Centre (MC); - emergency backup control center (EBCC); - congregations of civil protection (CP) and CP shelters; - communications with warning and notification system (VARVYR). From a historical and practical point of view in the vicinity of Jaslovske Bohunice has been set up a joint emergency control center. The center was located on the territory of the former already inoperative V1 NPP. V1 NPP is currently integrated into the organizational structure of JAVYS. Operating Bohunice V2 NPP plant is a designated part of the Slovenske Elektrarne, a. s., whose majority owner is an Italian operator ENEL. In terms of various relevant factors, it was decided to build a new emergency management center on the territory of operating V2 NPP, meet the current standards.

  3. The GLAST LAT Instrument Science Operations Center

    International Nuclear Information System (INIS)

    Cameron, Robert A.; SLAC

    2007-01-01

    The Gamma-ray Large Area Space Telescope (GLAST) is scheduled for launch in late 2007. Operations support and science data processing for the Large Area Telescope (LAT) instrument on GLAST will be provided by the LAT Instrument Science Operations Center (ISOC) at the Stanford Linear Accelerator Center (SLAC). The ISOC supports GLAST mission operations in conjunction with other GLAST mission ground system elements and supports the research activities of the LAT scientific collaboration. The ISOC will be responsible for monitoring the health and safety of the LAT, preparing command loads for the LAT, maintaining embedded flight software which controls the LAT detector and data acquisition flight hardware, maintaining the operating configuration of the LAT and its calibration, and applying event reconstruction processing to down-linked LAT data to recover information about detected gamma-ray photons. The SLAC computer farm will be used to process LAT event data and generate science products, to be made available to the LAT collaboration through the ISOC and to the broader scientific community through the GLAST Science Support Center at NASA/GSFC. ISOC science operations will optimize the performance of the LAT and oversee automated science processing of LAT data to detect and monitor transient gamma-ray sources

  4. Lessons Learned from Engineering a Multi-Mission Satellite Operations Center

    Science.gov (United States)

    Madden, Maureen; Cary, Everett, Jr.; Esposito, Timothy; Parker, Jeffrey; Bradley, David

    2006-01-01

    NASA's Small Explorers (SMEX) satellites have surpassed their designed science-lifetimes and their flight operations teams are now facing the challenge of continuing operations with reduced funding. At present, these missions are being re-engineered into a fleet-oriented ground system at Goddard Space Flight Center (GSFC). When completed, this ground system will provide command and control of four SMEX missions and will demonstrate fleet automation and control concepts. As a path-finder for future mission consolidation efforts, this ground system will also demonstrate new ground-based technologies that show promise of supporting longer mission lifecycles and simplifying component integration. One of the core technologies being demonstrated in the SMEX Mission Operations Center is the GSFC Mission Services Evolution Center (GMSEC) architecture. The GMSEC architecture uses commercial Message Oriented Middleware with a common messaging standard to realize a higher level of component interoperability, allowing for interchangeable components in ground systems. Moreover, automation technologies utilizing the GMSEC architecture are being evaluated and implemented to provide extended lights-out operations. This mode of operation will provide routine monitoring and control of the heterogeneous spacecraft fleet. The operational concepts being developed will reduce the need for staffed contacts and is seen as a necessity for fleet management. This paper will describe the experiences of the integration team throughout the re-enginering effort of the SMEX ground system. Additionally, lessons learned will be presented based on the team's experiences with integrating multiple missions into a fleet-automated ground system.

  5. Integrated real-time information to use in commercial, logistics and operational activities provide by the national control center operation of Transpetro

    Energy Technology Data Exchange (ETDEWEB)

    Aniceto, Hello A. R. [National Control Center Operation Transpetro, Rio de Janeiro, (Brazil)

    2010-07-01

    TRANSPETRO needed real time computational tools to manage its commercial, logistics and operational activities more efficiently. TRANSPETRO's National Control Center Operation developed an information site that provides information in real time on the process plans involved in each operation, using a Plant Information Management System (PIMS). SCADA systems were introduced during 2009 and 2010. This paper reports on the global introduction of the site and its basic architecture. Every screen displays the overall data in real time on movement in volume in pipeline operated by TRANSPETRO. The products transported are tracked for each infrastructure and are shown on dynamic geographic maps. Applications have been developed to improve the quality of information available to customers. It was found that the development of this site using PIMS technology brought gains in support to decision-making at the strategic and tactical levels for TRANSPETRO.

  6. Operational Control of Internal Transport

    NARCIS (Netherlands)

    J.R. van der Meer (Robert)

    2000-01-01

    textabstractOperational Control of Internal Transport considers the control of guided vehicles in vehicle-based internal transport systems found in facilities such as warehouses, production plants, distribution centers and transshipment terminals. The author's interest of research having direct use

  7. Industrial Assessment Center (IAC) Operations Manual

    Energy Technology Data Exchange (ETDEWEB)

    Gopalakrishnan, Bhaskaran [West Virginia Univ., Morgantown, WV (United States); Nimbalkar, Sachin U. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Wenning, Thomas J. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Thirumaran, Kiran [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2017-04-01

    IAC Operations Manual describes organizational model and operations of the Industrial Assessment Center (IAC), Center management activities, typical process of energy assessment, and energy assessment data for specific industry sectors.

  8. Design and Operational Evaluation of the Traffic Management Advisor at the Ft. Worth Air Route Traffic Control Center

    Science.gov (United States)

    Swenson, Harry N.; Vincent, Danny; Tobias, Leonard (Technical Monitor)

    1997-01-01

    NASA and the FAA have designed and developed and an automation tool known as the Traffic Management Advisor (TMA). The system was operationally evaluated at the Ft. Worth Air Route Traffic Control Center (ARTCC). The TMA is a time-based strategic planning tool that provides Traffic Management Coordinators and En Route Air Traffic Controllers the ability to efficiently optimize the capacity of a demand impacted airport. The TMA consists of trajectory prediction, constraint-based runway scheduling, traffic flow visualization and controllers advisories. The TMA was used and operationally evaluated for forty-one rush traffic periods during a one month period in the Summer of 1996. The evaluations included all shifts of air traffic operations as well as periods of inclement weather. Performance data was collected for engineering and human factor analysis and compared with similar operations without the TMA. The engineering data indicates that the operations with the TMA show a one to two minute per aircraft delay reduction during rush periods. The human factor data indicate a perceived reduction in en route controller workload as well as an increase in job satisfaction. Upon completion of the evaluation, the TMA has become part of the normal operations at the Ft. Worth ARTCC.

  9. Information sharing guidebook for transportation management centers, emergency operations centers, and fusion centers

    Science.gov (United States)

    2010-06-01

    This guidebook provides an overview of the mission and functions of transportation management centers, emergency operations centers, and fusion centers. The guidebook focuses on the types of information these centers produce and manage and how the sh...

  10. Information sharing guidebook for transportation management centers, emergency operations centers, and fusion centers.

    Science.gov (United States)

    2010-06-01

    This guidebook provides an overview of the mission and functions of transportation management centers, emergency operations centers, and fusion centers. The guidebook focuses on the types of information these centers produce and manage and how the sh...

  11. REMOTE OPERATION OF THE WEST COAST AND ALASKA TSUNAMI WARNING CENTER

    Directory of Open Access Journals (Sweden)

    Alec H. Medbery

    2002-01-01

    Full Text Available The remote control of real time derivation of earthquake location and magnitude and the issuance of tsunami and earthquake bulletins was done using off-the-shelf remote control software and hardware. Such remote operation of the West Coast/Alaska Tsunami Warning Center can decrease the time needed to respond to an earthquake by eliminating travel from the duty standers’ home to the tsunami warning center.

  12. Space Flight Operations Center local area network

    Science.gov (United States)

    Goodman, Ross V.

    1988-01-01

    The existing Mission Control and Computer Center at JPL will be replaced by the Space Flight Operations Center (SFOC). One part of the SFOC is the LAN-based distribution system. The purpose of the LAN is to distribute the processed data among the various elements of the SFOC. The SFOC LAN will provide a robust subsystem that will support the Magellan launch configuration and future project adaptation. Its capabilities include (1) a proven cable medium as the backbone for the entire network; (2) hardware components that are reliable, varied, and follow OSI standards; (3) accurate and detailed documentation for fault isolation and future expansion; and (4) proven monitoring and maintenance tools.

  13. Design basis for the NRC Operations Center

    Energy Technology Data Exchange (ETDEWEB)

    Lindell, M.K.; Wise, J.A.; Griffin, B.N.; Desrosiers, A.E.; Meitzler, W.D.

    1983-05-01

    This report documents the development of a design for a new NRC Operations Center (NRCOC). The project was conducted in two phases: organizational analysis and facility design. In order to control the amount of traffic, congestion and noise within the facility, it is recommended that information flow in the new NRCOC be accomplished by means of an electronic Status Information Management System. Functional requirements and a conceptual design for this system are described. An idealized architectural design and a detailed design program are presented that provide the appropriate amount of space for operations, equipment and circulation within team areas. The overall layout provides controlled access to the facility and, through the use of a zoning concept, provides each team within the NRCOC the appropriate balance of ready access and privacy determined from the organizational analyses conducted during the initial phase of the project.

  14. Design basis for the NRC Operations Center

    International Nuclear Information System (INIS)

    Lindell, M.K.; Wise, J.A.; Griffin, B.N.; Desrosiers, A.E.; Meitzler, W.D.

    1983-05-01

    This report documents the development of a design for a new NRC Operations Center (NRCOC). The project was conducted in two phases: organizational analysis and facility design. In order to control the amount of traffic, congestion and noise within the facility, it is recommended that information flow in the new NRCOC be accomplished by means of an electronic Status Information Management System. Functional requirements and a conceptual design for this system are described. An idealized architectural design and a detailed design program are presented that provide the appropriate amount of space for operations, equipment and circulation within team areas. The overall layout provides controlled access to the facility and, through the use of a zoning concept, provides each team within the NRCOC the appropriate balance of ready access and privacy determined from the organizational analyses conducted during the initial phase of the project

  15. A minimum attention control center for nuclear power plants

    International Nuclear Information System (INIS)

    Meijer, C.H.

    1986-01-01

    Control Centers for Nuclear Power Plants have characteristically been designed for maximum attention by the operating staffs of these plants. Consequently, the monitoring, control and diagnostics oriented cognitive activities by these staffs, were mostly ''data-driven'' in nature. This paper addresses a control center concept, under development by Combustion Engineering, that promotes a more ''information-driven'' cognitive interaction process between the operator and the plant. The more ''intelligent'' and therefore less attentive nature of such interactive process utilizes computer implemented cognitive engineered algorithms. The underlying structure of these algorithms is based upon the Critical Function/Success Path monitoring principle. The paper highlights a typical implementation of the minimum attention concept for the handling of unfamiliar safety related events. (author)

  16. CNC Turning Center Operations and Prove Out. Computer Numerical Control Operator/Programmer. 444-334.

    Science.gov (United States)

    Skowronski, Steven D.

    This student guide provides materials for a course designed to instruct the student in the recommended procedures used when setting up tooling and verifying part programs for a two-axis computer numerical control (CNC) turning center. The course consists of seven units. Unit 1 discusses course content and reviews and demonstrates set-up procedures…

  17. Magnetic field modeling and optimal operational control of a single-side axial-flux permanent magnet motor with center poles

    International Nuclear Information System (INIS)

    Liu, C.-T.; Lee, S.-C.

    2006-01-01

    A detailed approach for analyzing magnetic field distributions of a single-sided axial-flux permanent magnet motor with center poles will be provided. Based on the devised flux model, the related position-dependent torque and axial force of the motor can be systematically developed. By incorporating adequate control designs, the optimal operational performance of the motor system can be conveniently achieved. Results showed that not only the motor structure is suitable for related military and transportation applications, but also the magnetic field model can provide appropriate mathematical basis for relative operational realizations

  18. Mosquito and Fly Surveillance and Control Research at the USDA-ARS Center for Medical, Agricultural and Veterinary Entomology: Solving Operational Challenges

    Science.gov (United States)

    The Mosquito and Fly Research Unit of the USDA-ARS Center for Medical, Agricultural and Veterinary Entomology located in Gainesville Florida is the largest Federal laboratory devoted to specifically solving operational mosquito and fly surveillance and control challenges in the U.S. and internationa...

  19. CAMMESA control center controllers qualification; Habilitacion de operadores del centro de control de CAMMESA

    Energy Technology Data Exchange (ETDEWEB)

    Kaller, Daniel J [CAMMESA, Compania Administradora del Mercado Mayorista Electrico S.A., Buenos Aires (Argentina)

    2001-07-01

    The safety and quality of the Interconnection Argentine System (IAS) operation, basically depend on the personnel performance in the CAMMESA Operation Control Center (COC), which is the IAS maximum operative hierarchy, and whose mission is to coordinate the IAS and the dispatch of the AWEM (Argentine Wholesale Electric Market) in real time. With the goal of improving the COC controllers' qualification in order to prevent critical situations and to solve the emergences based on an efficient way, in 1999 the process of 'Habilitation of OCC Controllers' was accomplished according to the resolution number 208/98 from the Energy General Office. This technical contribution describes the executed stages and the acquired experiences when applying the mentioned procedure indicating the main found difficulties, reached results and obtained benefits.

  20. Voice Over Internet Protocol (VoIP) in a Control Center Environment

    Science.gov (United States)

    Pirani, Joseph; Calvelage, Steven

    2010-01-01

    The technology of transmitting voice over data networks has been available for over 10 years. Mass market VoIP services for consumers to make and receive standard telephone calls over broadband Internet networks have grown in the last 5 years. While operational costs are less with VoIP implementations as opposed to time division multiplexing (TDM) based voice switches, is it still advantageous to convert a mission control center s voice system to this newer technology? Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) has converted its mission voice services to a commercial product that utilizes VoIP technology. Results from this testing, design, and installation have shown unique considerations that must be addressed before user operations. There are many factors to consider for a control center voice design. Technology advantages and disadvantages were investigated as they refer to cost. There were integration concerns which could lead to complex failure scenarios but simpler integration for the mission infrastructure. MSFC HOSC will benefit from this voice conversion with less product replacement cost, less operations cost and a more integrated mission services environment.

  1. Poison Control Centers

    Science.gov (United States)

    ... 1222 immediately. Name State American Association of Poison Control Centers Address AAPCC Central Office NOT A POISON ... not for emergency use. Arkansas ASPCA Animal Poison Control Center Address 1717 S. Philo Road, Suite 36 Urbana, ...

  2. Emergency Operations Center ribbon cutting

    Science.gov (United States)

    2009-01-01

    Center Director Gene Goldman and special guests celebrate the opening of the site's new Emergency Operations Center on June 2. Participants included (l t r): Steven Cooper, deputy director of the National Weather Service Southern Region; Tom Luedtke, NASA associate administrator for institutions and management; Charles Scales, NASA associate deputy administrator; Mississippi Gov. Haley Barbour; Gene Goldman, director of Stennis Space Center; Jack Forsythe, NASA assistant administrator for the Office of Security and Program Protection; Dr. Richard Williams, NASA chief health and medical officer; and Weldon Starks, president of Starks Contracting Company Inc. of Biloxi.

  3. Job satisfaction among control room operators of electrical systems.

    Science.gov (United States)

    Macaia, Amanda A Silva; Marqueze, Elaine C; Rotenberg, Lúcia; Fischer, Frida Marina; Moreno, Claudia R C

    2012-01-01

    Shift workers from control centers of electrical systems are a group that has received little attention in Brazil. This study aimed to compare workers' job satisfaction at five control centers of a Brazilian company electrical system, and according to their job titles. The Organization Satisfaction Index (OSI) questionnaire to assess job satisfaction was used. ANOVA was used to compare OSI means, according to job title and control center. The results showed that there is no difference in job satisfaction among job titles, but a significant difference was found according to the control center. A single organizational culture cannot be applied to several branches. It is required to implement actions that would result in job satisfaction improvements among workers of all studied control rooms centers. The high level of education of operators working in all centers might have contributed to the similar values of perceived satisfaction among distinct job titles.

  4. Electricity Infrastructure Operations Center (EIOC)

    Data.gov (United States)

    Federal Laboratory Consortium — The Electricity Infrastructure Operations Center (EIOC) at PNNL brings together industry-leading software, real-time grid data, and advanced computation into a fully...

  5. NCC simulation model. Phase 2: Simulating the operations of the Network Control Center and NCC message manual

    Science.gov (United States)

    Benjamin, Norman M.; Gill, Tepper; Charles, Mary

    1994-01-01

    The network control center (NCC) provides scheduling, monitoring, and control of services to the NASA space network. The space network provides tracking and data acquisition services to many low-earth orbiting spacecraft. This report describes the second phase in the development of simulation models for the FCC. Phase one concentrated on the computer systems and interconnecting network.Phase two focuses on the implementation of the network message dialogs and the resources controlled by the NCC. Performance measures were developed along with selected indicators of the NCC's operational effectiveness.The NCC performance indicators were defined in terms of the following: (1) transfer rate, (2) network delay, (3) channel establishment time, (4) line turn around time, (5) availability, (6) reliability, (7) accuracy, (8) maintainability, and (9) security. An NCC internal and external message manual is appended to this report.

  6. Is function-based control room design human-centered?

    International Nuclear Information System (INIS)

    Norros, L.; Savioja, P.

    2006-01-01

    Function-based approaches to system interface design appears an appealing possibility in helping designers and operators to cope with the vast amount of information needed to control complex processes. In this paper we provide evidence of operator performance analyses showing that outcome-centered performance measures may not be sufficiently informative for design. We need analyses indicating habitual patterns of using information, operator practices. We argue that practices that portray functional orienting to the task support mastery of the process. They also create potential to make use of function-based information presentation. We see that functional design is not an absolute value. Instead, such design should support communication of the functional significance of the process information to the operators in variable situations. Hence, it should facilitate development of practices that focus to interpreting this message. Successful function-based design facilitates putting operations into their contexts and is human-centered in an extended sense: It aids making sense in the complex, dynamic and uncertain environment. (authors)

  7. Multi-Center Traffic Management Advisor Operational Field Test Results

    Science.gov (United States)

    Farley, Todd; Landry, Steven J.; Hoang, Ty; Nickelson, Monicarol; Levin, Kerry M.; Rowe, Dennis W.

    2005-01-01

    The Multi-Center Traffic Management Advisor (McTMA) is a research prototype system which seeks to bring time-based metering into the mainstream of air traffic control (ATC) operations. Time-based metering is an efficient alternative to traditional air traffic management techniques such as distance-based spacing (miles-in-trail spacing) and managed arrival reservoirs (airborne holding). While time-based metering has demonstrated significant benefit in terms of arrival throughput and arrival delay, its use to date has been limited to arrival operations at just nine airports nationally. Wide-scale adoption of time-based metering has been hampered, in part, by the limited scalability of metering automation. In order to realize the full spectrum of efficiency benefits possible with time-based metering, a much more modular, scalable time-based metering capability is required. With its distributed metering architecture, multi-center TMA offers such a capability.

  8. Metropolitan transportation management center concepts of operation : a cross-cutting study : improving transportation network efficiency

    Science.gov (United States)

    1999-10-01

    The implementor and operator of a regional transportation management center (TMC) face a challenging task. Operators of TMCsthe primary point of coordination for managing transportation resourcestypically control millions of dollars of intellig...

  9. VMware vCenter Operations Manager essentials

    CERN Document Server

    Malhoit, Lauren

    2014-01-01

    This book features step-by-step guides as well as practical, real-world examples, exploiting the premise that there's never just one way to narrow down problems. It tackles scenarios by going through different workflows to find the answers you need.This book is for administrators, engineers, and architects of VMware vSphere as well as those who have or are interested in purchasing the vCenter Operations Manager Suite. It will particularly help administrators who are hoping to use vCenter Operations Manager to optimize their VMware environments as well as quickly troubleshoot both long-term and

  10. 23 CFR 752.8 - Privately operated information centers and systems.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Privately operated information centers and systems. 752... may permit privately operated information centers and systems which conform with the standards of this... AND ENVIRONMENT LANDSCAPE AND ROADSIDE DEVELOPMENT § 752.8 Privately operated information centers and...

  11. Operation and management plan of Rokkasho Low Level Radioactive Waste Disposal Center

    International Nuclear Information System (INIS)

    Nakanishi, Z.; Tomozawa, T.; Mahara, Y.; Iimura, H.

    1993-01-01

    Japan Nuclear Fuel Limited (JNFL) started the operation of the Rokkasho Low-Level Radioactive Waste Disposal Center in December, 1992. This center is located at Rokkasho Village in Aomori Prefecture. The facility in this center will provide for the disposal of 40,000 m 3 of the low-level radioactive waste (LLW) produced from domestic nuclear power stations. The facility will receive between 5,000 m 3 and 10,000 m 3 of waste every year. Strict and efficient institutional controls, such as the monitoring of the environment and management of the site, is required for about 300 years. This paper provides an outline of the LLW burial operation and management program at the disposal facility. The facility is located 14--19 meters below the ground surface in the hollowed out Takahoko Formation

  12. Classification of Security Operation Centers

    CSIR Research Space (South Africa)

    Jacobs, P

    2013-08-01

    Full Text Available Security Operation Centers (SOCs) are a necessary service for organisations that want to address compliance and threat management. While there are frameworks in existence that addresses the technology aspects of these services, a holistic framework...

  13. Concept of Deployable Network Operations Center (DNOC)

    National Research Council Canada - National Science Library

    Bordetsky, Alex; Thiry, Jeff; Johnson, Shawn

    2005-01-01

    .... The increasing use of expeditionary and special operations forces in ad hoc, dynamic, and tactical environments poses a need for an adaptable, flexible, and responsive deployable network operations center (DNOC...

  14. Anatomy of a Security Operations Center

    Science.gov (United States)

    Wang, John

    2010-01-01

    Many agencies and corporations are either contemplating or in the process of building a cyber Security Operations Center (SOC). Those Agencies that have established SOCs are most likely working on major revisions or enhancements to existing capabilities. As principle developers of the NASA SOC; this Presenters' goals are to provide the GFIRST community with examples of some of the key building blocks of an Agency scale cyber Security Operations Center. This presentation viII include the inputs and outputs, the facilities or shell, as well as the internal components and the processes necessary to maintain the SOC's subsistence - in other words, the anatomy of a SOC. Details to be presented include the SOC architecture and its key components: Tier 1 Call Center, data entry, and incident triage; Tier 2 monitoring, incident handling and tracking; Tier 3 computer forensics, malware analysis, and reverse engineering; Incident Management System; Threat Management System; SOC Portal; Log Aggregation and Security Incident Management (SIM) systems; flow monitoring; IDS; etc. Specific processes and methodologies discussed include Incident States and associated Work Elements; the Incident Management Workflow Process; Cyber Threat Risk Assessment methodology; and Incident Taxonomy. The Evolution of the Cyber Security Operations Center viII be discussed; starting from reactive, to proactive, and finally to proactive. Finally, the resources necessary to establish an Agency scale SOC as well as the lessons learned in the process of standing up a SOC viII be presented.

  15. Operation and management plan of Rokkasho Low Level Radioactive Waste Disposal Center

    Energy Technology Data Exchange (ETDEWEB)

    Nakanishi, Z.; Tomozawa, T.; Mahara, Y.; Iimura, H. [Japan Nuclear Fuel Ltd., Tokyo (Japan). Radioactive Waste Management Dept.

    1993-12-31

    Japan Nuclear Fuel Limited (JNFL) started the operation of the Rokkasho Low-Level Radioactive Waste Disposal Center in December, 1992. This center is located at Rokkasho Village in Aomori Prefecture. The facility in this center will provide for the disposal of 40,000 m{sup 3} of the low-level radioactive waste (LLW) produced from domestic nuclear power stations. The facility will receive between 5,000 m{sup 3} and 10,000 m{sup 3} of waste every year. Strict and efficient institutional controls, such as the monitoring of the environment and management of the site, is required for about 300 years. This paper provides an outline of the LLW burial operation and management program at the disposal facility. The facility is located 14--19 meters below the ground surface in the hollowed out Takahoko Formation.

  16. Data Management Coordinators Monitor STS-78 Mission at the Huntsville Operations Support Center

    Science.gov (United States)

    1996-01-01

    Launched on June 20, 1996, the STS-78 mission's primary payload was the Life and Microgravity Spacelab (LMS), which was managed by the Marshall Space Flight Center (MSFC). During the 17 day space flight, the crew conducted a diverse slate of experiments divided into a mix of life science and microgravity investigations. In a manner very similar to future International Space Station operations, LMS researchers from the United States and their European counterparts shared resources such as crew time and equipment. Five space agencies (NASA/USA, European Space Agency/Europe (ESA), French Space Agency/France, Canadian Space Agency /Canada, and Italian Space Agency/Italy) along with research scientists from 10 countries worked together on the design, development and construction of the LMS. This photo represents Data Management Coordinators monitoring the progress of the mission at the Huntsville Operations Support Center (HOSC) Spacelab Payload Operations Control Center (SL POCC) at MSFC. Pictured are assistant mission scientist Dr. Dalle Kornfeld, Rick McConnel, and Ann Bathew.

  17. US Army Corps of Engineers Reachback Operations Center

    Data.gov (United States)

    Federal Laboratory Consortium — Providing Relevant Solutions to the Armed Forces and the NationThe USACE Reachback Operation Center at the U.S. Army Engineer Research and Development Center (ERDC)...

  18. HSIP Emergency Operations Centers (EOC) in New Mexico

    Data.gov (United States)

    Earth Data Analysis Center, University of New Mexico — Emergency Operations Centers (EOC) in New Mexico "The physical location at which the coordination of information and resources to support domestic incident...

  19. The advantages and disadvantages of centralized control of air power at operational level

    Science.gov (United States)

    Arisoy, Uǧur

    2014-05-01

    People do not want to see and hear a war. In today's world, if war is inevitable, the use of air power is seen as the preferable means of conducting operations instead of financially burdensome land battles which are more likely to cause heavy loss of life. The use of Air Power has gained importance in NATO operations in the Post-Cold War era. For example, air power has undertaken a decisive role from the beginning to the end of the operation in Libya. From this point of view, the most important issue to consider is how to direct air power more effectively at operational level. NATO's Core JFAC (Joint Force Air Command) was established in 2012 to control joint air power at operational level from a single center. US had experienced JFAC aproach in the Operation Desert Storm in 1991. UK, France, Germany, Italy and Spain are also directing their air power from their JFAC structures. Joint air power can be directed from a single center at operational level by means of JFAC. JFAC aproach provides complex planning progress of Air Power to be controled faster in a single center. An Air Power with a large number of aircrafts, long range missiles of cutting-edge technology may have difficulties in achieving results unless directed effectively. In this article, directing air power more effectively at operational level has been studied in the framework of directing air power from a single center carried out by SWOT analysis technique. "Directing Air Power at operational level from a single center similar to JFAC-like structure" is compared with "Directing Air Power at operational level from two centers similar to AC (Air Command) + CAOC (Combined Air Operations Center) structure" As a result of this study, it is assessed that directing air power at operational level from a single center would bring effectiveness to the air campaign. The study examines directing air power at operational level. Developments at political, strategic and tactical levels have been ignored.

  20. What makes a control system usable? An operational viewpoint

    International Nuclear Information System (INIS)

    Clay, M.

    1990-01-01

    This report discusses the generally accepted successes and shortcomings of the various computer and hardware-based control systems at the Los Alamos Meson Physics Facility (LAMPF) from an operator's standpoint. LAMPF currently utilizes three separate control rooms that, although critically co-dependent, use distinct operating methods. The first, the Injector Control Room, which is responsible for the operation of the three ion sources, the 750 keV transport lines and the 201.25 MHz portion of the linac, uses a predominantly hardware-based control system. The second, the LANSCE Control Room, which is responsible for the operation of the Los Alamos Neutron Scattering Center, uses a graphical touch-panel interface with single-application screens as its control system. The third, the LAMPF Central Control Room, which is responsible for the overall operation of LAMPF, primarily uses a text-oriented keyboard interface with multiple applications per screen. Though each system provides generally reliable human interfacing to the enormously complex and diverse machine known as LAMPF, the operational requirements of speed, usability, and reliability are increasingly necessitating the use of a standard control system that incorporates the positive aspects of all three control systems. (orig.)

  1. Advanced Control Test Operation (ACTO) facility

    International Nuclear Information System (INIS)

    Ball, S.J.

    1987-01-01

    The Advanced Control Test Operation (ACTO) project, sponsored by the US Department of Energy (DOE), is being developed to enable the latest modern technology, automation, and advanced control methods to be incorporated into nuclear power plants. The facility is proposed as a national multi-user center for advanced control development and testing to be completed in 1991. The facility will support a wide variety of reactor concepts, and will be used by researchers from Oak Ridge National Laboratory (ORNL), plus scientists and engineers from industry, other national laboratories, universities, and utilities. ACTO will also include telecommunication facilities for remote users

  2. Expert operator preferences in remote manipulator control systems

    International Nuclear Information System (INIS)

    Sundstrom, E.; Draper, J.V.; Fausz, A.; Woods, H.

    1995-06-01

    This report describes a survey of expert remote manipulator operators designed to identify features of control systems related to operator efficiency and comfort. It provides information for designing the control center for the Single-Shell Tank Waste Retrieval Manipulator System (TWRMS) Test Bed, described in a separate report. Research questions concerned preferred modes of control, optimum work sessions, sources of operator fatigue, importance of control system design features, and desired changes in control rooms. Participants comprised four expert remote manipulator operators at Oak Ridge National Laboratory, who individually have from 9 to 20 years of experience using teleoperators. The operators had all used rate and position control, and all preferred bilateral (force-reflecting) position control. They reported spending an average of 2.75 h in control of a teleoperator system during a typical shift. All were accustomed to working in a crew of two and alternating control and support roles in 2-h rotations in an 8-h shift. Operators reported that fatigue in using remote manipulator systems came mainly from watching TV monitors and making repetitive motions. Three of four experienced symptoms, including headaches and sore eyes, wrists, and back. Of 17 features of control rooms rated on importance, highest ratings went to comfort and support provided by the operator chair, location of controls, location of video monitors, video image clarity, types of controls, and control modes. When asked what they wanted to change, operators said work stations designed for comfort; simpler, lighter hand-controls; separate controls for each camera; better placement of remote camera; color monitors; and control room layouts that support crew interaction. Results of this small survey reinforced the importance of ergonomic factors in remote manipulation

  3. Spacecraft control center automation using the generic inferential executor (GENIE)

    Science.gov (United States)

    Hartley, Jonathan; Luczak, Ed; Stump, Doug

    1996-01-01

    The increasing requirement to dramatically reduce the cost of mission operations led to increased emphasis on automation technology. The expert system technology used at the Goddard Space Flight Center (MD) is currently being applied to the automation of spacecraft control center activities. The generic inferential executor (GENIE) is a tool which allows pass automation applications to be constructed. The pass script templates constructed encode the tasks necessary to mimic flight operations team interactions with the spacecraft during a pass. These templates can be configured with data specific to a particular pass. Animated graphical displays illustrate the progress during the pass. The first GENIE application automates passes of the solar, anomalous and magnetospheric particle explorer (SAMPEX) spacecraft.

  4. Automated Air Traffic Control Operations with Weather and Time-Constraints: A First Look at (Simulated) Far-Term Control Room Operations

    Science.gov (United States)

    Prevot, Thomas; Homola, Jeffrey R.; Martin, Lynne H.; Mercer, Joey S.; Cabrall, Christopher C.

    2011-01-01

    In this paper we discuss results from a recent high fidelity simulation of air traffic control operations with automated separation assurance in the presence of weather and time-constraints. We report findings from a human-in-the-loop study conducted in the Airspace Operations Laboratory (AOL) at the NASA Ames Research Center. During four afternoons in early 2010, fifteen active and recently retired air traffic controllers and supervisors controlled high levels of traffic in a highly automated environment during three-hour long scenarios, For each scenario, twelve air traffic controllers operated eight sector positions in two air traffic control areas and were supervised by three front line managers, Controllers worked one-hour shifts, were relieved by other controllers, took a 3D-minute break, and worked another one-hour shift. On average, twice today's traffic density was simulated with more than 2200 aircraft per traffic scenario. The scenarios were designed to create peaks and valleys in traffic density, growing and decaying convective weather areas, and expose controllers to heavy and light metering conditions. This design enabled an initial look at a broad spectrum of workload, challenge, boredom, and fatigue in an otherwise uncharted territory of future operations. In this paper we report human/system integration aspects, safety and efficiency results as well as airspace throughput, workload, and operational acceptability. We conclude that, with further refinements. air traffic control operations with ground-based automated separation assurance can be an effective and acceptable means to routinely provide very high traffic throughput in the en route airspace.

  5. RF Regional Technical Centers for MPC and A Sustainability Operations

    International Nuclear Information System (INIS)

    Lambert, L D; Toth, W J; Hendrickson, S

    2004-01-01

    The National Nuclear Security Administration (NNSA) programmatic vision to be a catalyst in Russia's assumption of responsibility for long-term system operation is exemplified in the sustainability cooperation with the RF Ministry of Defense (MOD). An identified goal for the MPC and A Program is to encourage the development of Russian Federation (RF) capabilities and commitments to operate and maintain safeguard improvements. The RF MOD Technical Support Center development fulfills the NNSA mission and MPC and A Program goal. The regional technical center concept involves a systematic approach to aid in the determination of the level of sustainability assistance required to transition operators, maintenance, training, and testing of MPC and A systems to the RF MOD. This paper describes the process used to create the RF MOD Technical support center. First are described the needs analyses conducted to determine the key system sustainability factors requiring support. These sustainability functions are then compiled to influence the form and ultimate physical design of the technical support center. Operational interfaces are described, in detail that show the benefit of the center to the individual sites. Finally, benefits relating to information accessibility and other economies of scale are described that highlight the central center concept's strengths

  6. Operating The Central Process Systems At Glenn Research Center

    Science.gov (United States)

    Weiler, Carly P.

    2004-01-01

    As a research facility, the Glenn Research Center (GRC) trusts and expects all the systems, controlling their facilities to run properly and efficiently in order for their research and operations to occur proficiently and on time. While there are many systems necessary for the operations at GRC, one of those most vital systems is the Central Process Systems (CPS). The CPS controls operations used by GRC's wind tunnels, propulsion systems lab, engine components research lab, and compressor, turbine and combustor test cells. Used widely throughout the lab, it operates equipment such as exhausters, chillers, cooling towers, compressors, dehydrators, and other such equipment. Through parameters such as pressure, temperature, speed, flow, etc., it performs its primary operations on the major systems of Electrical Dispatch (ED), Central Air Dispatch (CAD), Central Air Equipment Building (CAEB), and Engine Research Building (ERB). In order for the CPS to continue its operations at Glenn, a new contract must be awarded. Consequently, one of my primary responsibilities was assisting the Source Evaluation Board (SEB) with the process of awarding the recertification contract of the CPS. The job of the SEB was to evaluate the proposals of the contract bidders and then to present their findings to the Source Selecting Official (SSO). Before the evaluations began, the Center Director established the level of the competition. For this contract, the competition was limited to those companies classified as a small, disadvantaged business. After an industry briefing that explained to qualified companies the CPS and type of work required, each of the interested companies then submitted proposals addressing three components: Mission Suitability, Cost, and Past Performance. These proposals were based off the Statement of Work (SOW) written by the SEB. After companies submitted their proposals, the SEB reviewed all three components and then presented their results to the SSO. While the

  7. Distribution control centers in the Croatian power system with particular consideration on ZAgreb distribution control center

    International Nuclear Information System (INIS)

    Cupin, N.

    2000-01-01

    Discussion about control of Croatian Power system in the view of forthcoming free electricity market did not included do far distribution level. With this article we would like to clarify the role of distribution control centers pointing out importance of Zagreb Distribution control center, with controls one third of Croatian (HEP) consumption. (author)

  8. Test Control Center (TCC)

    Data.gov (United States)

    Federal Laboratory Consortium — The Test Control Center (TCC) provides a consolidated facility for planning, coordinating, controlling, monitoring, and analyzing distributed test events. ,The TCC...

  9. Emergency control centers for nuclear power plants

    International Nuclear Information System (INIS)

    Anon.

    1979-01-01

    Guidance is provided for the development and implementation of emergency control centers for nuclear power plants, including nuclear plant control room, nuclear plant company headquarters, emergency control center, and nuclear plant alternate emergency control center. Requirements and recommendations are presented for the mission, communications, instrumentation and equipment associated with each type of control center. Decisional aids, manning requirements and resources are also given; the decision aids cover both the accident assessment and protective action areas. Both normal and alternate means of communications are considered. Off-site emergency control centers, although not covered in the strict sense by this standard, are considered in an appendix

  10. Stretching and joint mobilization exercises reduce call-center operators' musculoskeletal discomfort and fatigue

    Directory of Open Access Journals (Sweden)

    Denise Helena de Castro Lacaze

    2010-01-01

    Full Text Available AIM: We sought to evaluate musculoskeletal discomfort and mental and physical fatigue in the call-center workers of an airline company before and after a supervised exercise program compared with rest breaks during the work shift. INTRODUCTION: This was a longitudinal pilot study conducted in a flight-booking call-center for an airline in São Paulo, Brazil. Occupational health activities are recommended to decrease the negative effects of the call-center working conditions. In practice, exercise programs are commonly recommended for computer workers, but their effects have not been studied in call-center operators. METHODS: Sixty-four call-center operators participated in this study. Thirty-two subjects were placed into the experimental group and attended a 10-min daily exercise session for 2 months. Conversely, 32 participants were placed into the control group and took a 10-min daily rest break during the same period. Each subject was evaluated once a week by means of the Corlett-Bishop body map with a visual analog discomfort scale and the Chalder fatigue questionnaire. RESULTS: Musculoskeletal discomfort decreased in both groups, but the reduction was only statistically significant for the spine and buttocks (p=0.04 and the sum of the segments (p=0.01 in the experimental group. In addition, the experimental group showed significant differences in the level of mental fatigue, especially in questions related to memory Rienzo, #181ff and tiredness (p=0.001. CONCLUSIONS: Our preliminary results demonstrate that appropriately designed and supervised exercise programs may be more efficient than rest breaks in decreasing discomfort and fatigue levels in call-center operators.

  11. The Next Generation of Ground Operations Command and Control; Scripting in C no. and Visual Basic

    Science.gov (United States)

    Ritter, George; Pedoto, Ramon

    2010-01-01

    Scripting languages have become a common method for implementing command and control solutions in space ground operations. The Systems Test and Operations Language (STOL), the Huntsville Operations Support Center (HOSC) Scripting Language Processor (SLP), and the Spacecraft Control Language (SCL) offer script-commands that wrap tedious operations tasks into single calls. Since script-commands are interpreted, they also offer a certain amount of hands-on control that is highly valued in space ground operations. Although compiled programs seem to be unsuited for interactive user control and are more complex to develop, Marshall Space flight Center (MSFC) has developed a product called the Enhanced and Redesign Scripting (ERS) that makes use of the graphical and logical richness of a programming language while offering the hands-on and ease of control of a scripting language. ERS is currently used by the International Space Station (ISS) Payload Operations Integration Center (POIC) Cadre team members. ERS integrates spacecraft command mnemonics, telemetry measurements, and command and telemetry control procedures into a standard programming language, while making use of Microsoft's Visual Studio for developing Visual Basic (VB) or C# ground operations procedures. ERS also allows for script-style user control during procedure execution using a robust graphical user input and output feature. The availability of VB and C# programmers, and the richness of the languages and their development environment, has allowed ERS to lower our "script" development time and maintenance costs at the Marshall POIC.

  12. Controls Over Operating System and Security Software Supporting the Defense Finance and Accounting Service

    National Research Council Canada - National Science Library

    McKinney, Terry

    1994-01-01

    This is the final in a series of three audits of management controls over the operating systems and security software used by the information processing centers that support the Defense Finance and Accounting Centers (DFAS...

  13. Workforce Optimization for Bank Operation Centers: A Machine Learning Approach

    Directory of Open Access Journals (Sweden)

    Sefik Ilkin Serengil

    2017-12-01

    Full Text Available Online Banking Systems evolved and improved in recent years with the use of mobile and online technologies, performing money transfer transactions on these channels can be done without delay and human interaction, however commercial customers still tend to transfer money on bank branches due to several concerns. Bank Operation Centers serve to reduce the operational workload of branches. Centralized management also offers personalized service by appointed expert employees in these centers. Inherently, workload volume of money transfer transactions changes dramatically in hours. Therefore, work-force should be planned instantly or early to save labor force and increase operational efficiency. This paper introduces a hybrid multi stage approach for workforce planning in bank operation centers by the application of supervised and unsu-pervised learning algorithms. Expected workload would be predicted as supervised learning whereas employees are clus-tered into different skill groups as unsupervised learning to match transactions and proper employees. Finally, workforce optimization is analyzed for proposed approach on production data.

  14. WFIRST: STScI Science Operations Center (SSOC) Activities and Plans

    Science.gov (United States)

    Gilbert, Karoline M.; STScI WFIRST Team

    2018-01-01

    The science operations for the WFIRST Mission will be distributed between Goddard Space Flight Center, the Space Telescope Science Institute (STScI), and the Infrared Processing and Analysis Center (IPAC). The STScI Science Operations Center (SSOC) will schedule and archive all WFIRST observations, will calibrate and produce pipeline-reduced data products for the Wide Field Instrument, and will support the astronomical community in planning WFI observations and analyzing WFI data. During the formulation phase, WFIRST team members at STScI have developed operations concepts for scheduling, data management, and the archive; have performed technical studies investigating the impact of WFIRST design choices on data quality and analysis; and have built simulation tools to aid the community in exploring WFIRST’s capabilities. We will highlight examples of each of these efforts.

  15. 9 Office of Regions and Center Operations LANS -

    Data.gov (United States)

    Department of Transportation — The 9 Office of Regions and Center Operations LANS located at regional offices is the backbone that provides connectivity to systems including servers, workstations,...

  16. Kepler Science Operations Center Pipeline Framework

    Science.gov (United States)

    Klaus, Todd C.; McCauliff, Sean; Cote, Miles T.; Girouard, Forrest R.; Wohler, Bill; Allen, Christopher; Middour, Christopher; Caldwell, Douglas A.; Jenkins, Jon M.

    2010-01-01

    The Kepler mission is designed to continuously monitor up to 170,000 stars at a 30 minute cadence for 3.5 years searching for Earth-size planets. The data are processed at the Science Operations Center (SOC) at NASA Ames Research Center. Because of the large volume of data and the memory and CPU-intensive nature of the analysis, significant computing hardware is required. We have developed generic pipeline framework software that is used to distribute and synchronize the processing across a cluster of CPUs and to manage the resulting products. The framework is written in Java and is therefore platform-independent, and scales from a single, standalone workstation (for development and research on small data sets) to a full cluster of homogeneous or heterogeneous hardware with minimal configuration changes. A plug-in architecture provides customized control of the unit of work without the need to modify the framework itself. Distributed transaction services provide for atomic storage of pipeline products for a unit of work across a relational database and the custom Kepler DB. Generic parameter management and data accountability services are provided to record the parameter values, software versions, and other meta-data used for each pipeline execution. A graphical console allows for the configuration, execution, and monitoring of pipelines. An alert and metrics subsystem is used to monitor the health and performance of the pipeline. The framework was developed for the Kepler project based on Kepler requirements, but the framework itself is generic and could be used for a variety of applications where these features are needed.

  17. Free-Piston Stirling Convertor Controller Development at NASA Glenn Research Center

    Science.gov (United States)

    Regan, Timothy

    2004-01-01

    The free-piston Stirling convertor end-to-end modeling effort at NASA Glenn Research Center (GRC) has produced a software-based test bed in which free-piston Stirling convertors can be simulated and evaluated. The simulation model includes all the components of the convertor - the Stirling cycle engine, linear alternator, controller, and load. This paper is concerned with controllers. It discusses three controllers that have been studied using this model. Case motion has been added to the model recently so that effects of differences between convertor components can be simulated and ameliorative control engineering techniques can be developed. One concern when applying a system comprised of interconnected mass-spring-damper components is to prevent operation in any but the intended mode. The design mode is the only desired mode of operation, but all other modes are considered in controller design.

  18. Event Sequence Analysis of the Air Intelligence Agency Information Operations Center Flight Operations

    National Research Council Canada - National Science Library

    Larsen, Glen

    1998-01-01

    This report applies Event Sequence Analysis, methodology adapted from aircraft mishap investigation, to an investigation of the performance of the Air Intelligence Agency's Information Operations Center (IOC...

  19. Automated space vehicle control for rendezvous proximity operations

    Science.gov (United States)

    Lea, Robert N.

    1988-01-01

    Rendezvous during the unmanned space exploration missions, such as a Mars Rover/Sample Return will require a completely automatic system from liftoff to docking. A conceptual design of an automated rendezvous, proximity operations, and docking system is being implemented and validated at the Johnson Space Center (JSC). The emphasis is on the progress of the development and testing of a prototype system for control of the rendezvous vehicle during proximity operations that is currently being developed at JSC. Fuzzy sets are used to model the human capability of common sense reasoning in decision making tasks and such models are integrated with the expert systems and engineering control system technology to create a system that performs comparably to a manned system.

  20. Space Operations Learning Center

    Science.gov (United States)

    Lui, Ben; Milner, Barbara; Binebrink, Dan; Kuok, Heng

    2012-01-01

    The Space Operations Learning Center (SOLC) is a tool that provides an online learning environment where students can learn science, technology, engineering, and mathematics (STEM) through a series of training modules. SOLC is also an effective media for NASA to showcase its contributions to the general public. SOLC is a Web-based environment with a learning platform for students to understand STEM through interactive modules in various engineering topics. SOLC is unique in its approach to develop learning materials to teach schoolaged students the basic concepts of space operations. SOLC utilizes the latest Web and software technologies to present this educational content in a fun and engaging way for all grade levels. SOLC uses animations, streaming video, cartoon characters, audio narration, interactive games and more to deliver educational concepts. The Web portal organizes all of these training modules in an easily accessible way for visitors worldwide. SOLC provides multiple training modules on various topics. At the time of this reporting, seven modules have been developed: Space Communication, Flight Dynamics, Information Processing, Mission Operations, Kids Zone 1, Kids Zone 2, and Save The Forest. For the first four modules, each contains three components: Flight Training, Flight License, and Fly It! Kids Zone 1 and 2 include a number of educational videos and games designed specifically for grades K-6. Save The Forest is a space operations mission with four simulations and activities to complete, optimized for new touch screen technology. The Kids Zone 1 module has recently been ported to Facebook to attract wider audience.

  1. NASA Airline Operations Research Center

    Science.gov (United States)

    Mogford, Richard H.

    2016-01-01

    This is a PowerPoint presentation NASA airline operations center (AOC) research. It includes information on using IBM Watson in the AOC. It also reviews a dispatcher decision support tool call the Flight Awareness Collaboration Tool (FACT). FACT gathers information about winter weather onto one screen and includes predictive abilities. It should prove to be useful for airline dispatchers and airport personnel when they manage winter storms and their effect on air traffic. This material is very similar to other previously approved presentations with the same title.

  2. POISON CONTROL—Operation of an Information Center in a Rural and Agricultural Community

    Science.gov (United States)

    Bocian, J. J.

    1960-01-01

    The Fresno Community Hospital Poison Control Center has been in operation for about three years, under the sole directorship of the pathologist. All expenses are paid by the hospital. It has served a definite need in the community. As an agricultural and more or less rural community, it shows more poison cases having to do with plants, insecticides, kerosene and fertilizers than do urban communities. PMID:13801875

  3. Workforce Optimization for Bank Operation Centers: A Machine Learning Approach

    OpenAIRE

    Sefik Ilkin Serengil; Alper Ozpinar

    2017-01-01

    Online Banking Systems evolved and improved in recent years with the use of mobile and online technologies, performing money transfer transactions on these channels can be done without delay and human interaction, however commercial customers still tend to transfer money on bank branches due to several concerns. Bank Operation Centers serve to reduce the operational workload of branches. Centralized management also offers personalized service by appointed expert employees in these centers. In...

  4. 46 CFR 111.70-3 - Motor controllers and motor-control centers.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Motor controllers and motor-control centers. 111.70-3... ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Motor Circuits, Controllers, and Protection § 111.70-3 Motor controllers and motor-control centers. (a) General. The enclosure for each motor controller or motor-control...

  5. Regional Test Center Operations Manual

    Energy Technology Data Exchange (ETDEWEB)

    Stein, Joshua [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Burnham, Laurie [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Jones, Christian Birk [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-07-01

    The U.S. DOE Regional Test Center for Solar Technologies program was established to validate photovoltaic (PV) technologies installed in a range of different climates. The program is funded by the Energy Department's SunShot Initiative. The initiative seeks to make solar energy cost competitive with other forms of electricity by the end of the decade. Sandia National Laboratory currently manages four different sites across the country. The National Renewable Energy Laboratory manages a fifth site in Colorado. The entire PV portfolio currently includes 20 industry partners and almost 500 kW of installed systems. The program follows a defined process that outlines tasks, milestones, agreements, and deliverables. The process is broken out into four main parts: 1) planning and design, 2) installation, 3) operations, and 4) decommissioning. This operations manual defines the various elements of each part.

  6. The TESS Science Processing Operations Center

    Science.gov (United States)

    Jenkins, Jon M.; Twicken, Joseph D.; McCauliff, Sean; Campbell, Jennifer; Sanderfer, Dwight; Lung, David; Mansouri-Samani, Masoud; Girouard, Forrest; Tenenbaum, Peter; Klaus, Todd; hide

    2016-01-01

    The Transiting Exoplanet Survey Satellite (TESS) will conduct a search for Earth's closest cousins starting in early 2018 and is expected to discover approximately 1,000 small planets with R(sub p) less than 4 (solar radius) and measure the masses of at least 50 of these small worlds. The Science Processing Operations Center (SPOC) is being developed at NASA Ames Research Center based on the Kepler science pipeline and will generate calibrated pixels and light curves on the NASA Advanced Supercomputing Division's Pleiades supercomputer. The SPOC will also search for periodic transit events and generate validation products for the transit-like features in the light curves. All TESS SPOC data products will be archived to the Mikulski Archive for Space Telescopes (MAST).

  7. Design and operation of the emergency support center, CAE

    International Nuclear Information System (INIS)

    Caro, R. J.; Lopez Trillo, E.

    2016-01-01

    The enhancements developed in Spain in the area of Emergency Management, as consequence of the accident at the Fukushima Dai-Ichi NPP in 2011, included the definition of new emergency response centers; Alternative Center for Emergency Management (CAGE) on each NPP and the Emergency Support Center (CAE), shared by all NPPs. This article summarizes the main features and operation activities undertaken since the establishment of the new CAE, centralized, external to the NPPs shared by all Spanish plants and managed by Tecnatom. (Author)

  8. Decommissioning Operations at the Cadarache Nuclear Research Center

    International Nuclear Information System (INIS)

    Gouhier, E.

    2008-01-01

    Among the different activities of the CEA research center of Cadarache, located in the south of France, one of the most important involves decommissioning. As old facilities close, decommissioning activity increases. This presentation will give an overview of the existing organization and the different ongoing decommissioning and cleanup operations on the site. We shall also present some of the new facilities under construction the purpose of which is to replace the decommissioned ones. Cadarache research center was created on October 14, 1959. Today, the activities of the research center are shared out among several technological R and D platforms, essentially devoted to nuclear energy (fission and fusion) Acting as a support to these R and D activities, the center of Cadarache has a platform of services which groups the auxiliary services required by the nuclear facilities and those necessary to the management of nuclear materials, waste, nuclear facility releases and decommissioning. Many old facilities have shut down in recent years (replaced by new facilities) and a whole decommissioning program is now underway involving the dismantling of nuclear reactors (Rapsodie, Harmonie), processing facilities (ATUE uranium treatment facility, LECA UO 2 facility) as well as waste treatment and storage facilities (INB37, INB 56. In conclusion: other dismantling and cleanup operations that are now underway in Cadarache include the following: - Waste treatment and storage facilities, - Historical VLLW and HLW storage facility, - Fissile material storage building, - Historical spent fuel storage facility. Thanks to the project organization: - Costs and risks on these projects can be reduced. - Engineers and technicians can easily move from one project to another. In some cases, when a new facility is under construction for the purpose of replacing a decommissioned one, some of the project team can integrate the new facility as members of the operation team. Today

  9. Internet Protocol Display Sharing Solution for Mission Control Center Video System

    Science.gov (United States)

    Brown, Michael A.

    2009-01-01

    With the advent of broadcast television as a constant source of information throughout the NASA manned space flight Mission Control Center (MCC) at the Johnson Space Center (JSC), the current Video Transport System (VTS) characteristics provides the ability to visually enhance real-time applications as a broadcast channel that decision making flight controllers come to rely on, but can be difficult to maintain and costly. The Operations Technology Facility (OTF) of the Mission Operations Facility Division (MOFD) has been tasked to provide insight to new innovative technological solutions for the MCC environment focusing on alternative architectures for a VTS. New technology will be provided to enable sharing of all imagery from one specific computer display, better known as Display Sharing (DS), to other computer displays and display systems such as; large projector systems, flight control rooms, and back supporting rooms throughout the facilities and other offsite centers using IP networks. It has been stated that Internet Protocol (IP) applications are easily readied to substitute for the current visual architecture, but quality and speed may need to be forfeited for reducing cost and maintainability. Although the IP infrastructure can support many technologies, the simple task of sharing ones computer display can be rather clumsy and difficult to configure and manage to the many operators and products. The DS process shall invest in collectively automating the sharing of images while focusing on such characteristics as; managing bandwidth, encrypting security measures, synchronizing disconnections from loss of signal / loss of acquisitions, performance latency, and provide functions like, scalability, multi-sharing, ease of initial integration / sustained configuration, integration with video adjustments packages, collaborative tools, host / recipient controllability, and the utmost paramount priority, an enterprise solution that provides ownership to the whole

  10. Energy Center Structure Optimization by using Smart Technologies in Process Control System

    Science.gov (United States)

    Shilkina, Svetlana V.

    2018-03-01

    The article deals with practical application of fuzzy logic methods in process control systems. A control object - agroindustrial greenhouse complex, which includes its own energy center - is considered. The paper analyzes object power supply options taking into account connection to external power grids and/or installation of own power generating equipment with various layouts. The main problem of a greenhouse facility basic process is extremely uneven power consumption, which forces to purchase redundant generating equipment idling most of the time, which quite negatively affects project profitability. Energy center structure optimization is largely based on solving the object process control system construction issue. To cut investor’s costs it was proposed to optimize power consumption by building an energy-saving production control system based on a fuzzy logic controller. The developed algorithm of automated process control system functioning ensured more even electric and thermal energy consumption, allowed to propose construction of the object energy center with a smaller number of units due to their more even utilization. As a result, it is shown how practical use of microclimate parameters fuzzy control system during object functioning leads to optimization of agroindustrial complex energy facility structure, which contributes to a significant reduction in object construction and operation costs.

  11. Study on the operational guides of the off-site emergency management center

    International Nuclear Information System (INIS)

    Park, Won Jong; Han, S. J.; Oh, K. H.

    2005-01-01

    The emergency response organizational groups and roles of Off-site Emergency Management Center was proposed to respond in case of radiological emergency. Development of implementing procedures of Off-site Emergency Management Center in case of radiological emergency to improve effective co-operation and rapid response in radiological emergency. Establishment of 'The Ordinance of Operation of residence radiological emergency office of the Minister of Science and Technology' and announced by the Minister of Science and Technology. The Implementing procedures of Off-site Emergency Management Center and 'The Ordinance of Operation of residence radiological emergency office of the Minister of Science and Technology' can be provide guidelines in case of emergency

  12. Mental Workload and Performance Experiment (MWPE) Team in the Spacelab Payload Operations Control

    Science.gov (United States)

    1992-01-01

    The primary payload for Space Shuttle Mission STS-42, launched January 22, 1992, was the International Microgravity Laboratory-1 (IML-1), a pressurized manned Spacelab module. The goal of IML-1 was to explore in depth the complex effects of weightlessness of living organisms and materials processing. Around-the-clock research was performed on the human nervous system's adaptation to low gravity and effects of microgravity on other life forms such as shrimp eggs, lentil seedlings, fruit fly eggs, and bacteria. Materials processing experiments were also conducted, including crystal growth from a variety of substances such as enzymes, mercury iodide, and a virus. The Huntsville Operations Support Center (HOSC) Spacelab Payload Operations Control Center (SL POCC) at the Marshall Space Flight Center (MSFC) was the air/ground communication channel used between the astronauts and ground control teams during the Spacelab missions. Featured is the Mental Workload and Performance Experiment (MWPE) team in the SL POCC) during STS-42, IML-1 mission.

  13. Department of Energy Support for Operations of the WMO/GAW Quality Control/Science Activity Center for the Americas

    Energy Technology Data Exchange (ETDEWEB)

    Hicks, B. B.

    2003-11-13

    As a formal activity of the World Meteorological Organization's Global Atmosphere Watch, to provide, through agency collaboration, a center of excellence in the United States that would impose quality assurance techniques on data collected by national air and precipitation quality networks operating in the Americas (north, south, and central).

  14. The Poison Control Center--Its Role

    Science.gov (United States)

    Manoguerra, Anthony S.

    1976-01-01

    Poison Control Centers are being utilized by more schools of pharmacy each year as training sites for students. This paper discusses what such a center is, its services, changes anticipated in the poison center system in the next several years and how they may influence pharmacy education, specifically as it relates to clinical toxicology.…

  15. Test bed control center design concept for Tank Waste Retrieval Manipulator Systems

    International Nuclear Information System (INIS)

    Sundstrom, E.; Draper, J.V.; Fausz, A.

    1995-01-01

    This paper describes the design concept for the control center for the Single Shell Tank Waste Retrieval Manipulator System test bed and the design process behind the concept. The design concept supports all phases of the test bed mission, including technology demonstration, comprehensive system testing, and comparative evaluation for further development and refinement of the TWRMS for field operations

  16. Controlled coupling of NV defect centers to plasmonic and photonic nanostructures

    Energy Technology Data Exchange (ETDEWEB)

    Barth, Michael, E-mail: michael.barth@physik.hu-berlin.d [Institute of Physics, Humboldt-Universitaet zu Berlin, Hausvogteiplatz 5-7, D-10117 Berlin (Germany); Schietinger, Stefan; Schroeder, Tim; Aichele, Thomas; Benson, Oliver [Institute of Physics, Humboldt-Universitaet zu Berlin, Hausvogteiplatz 5-7, D-10117 Berlin (Germany)

    2010-09-15

    Nitrogen-vacancy (NV) defect centers in diamond have recently emerged as promising candidates for a number of applications in the fields of quantum optics and quantum information, such as single photon generation and spin qubit operations. The performance of these defect centers can strongly be enhanced through coupling to plasmonic and photonic nanostructures, such as metal particles and optical microcavities. Here, we demonstrate the controlled assembly of such hybrid structures via manipulation with scanning near-field probes. In particular, we investigate the plasmonic enhancement of the single photon emission through coupling to gold nanospheres as well as the coupling of diamond nanocrystals to the optical modes of microsphere resonators and photonic crystal cavities. These systems represent prototypes of fundamental nanophotonic/plasmonic elements and provide control on the generation and coherent transfer of photons on the level of a single quantum emitter.

  17. Microsoft System Center 2012 R2 Operations Manager cookbook

    CERN Document Server

    Beaumont (MVP), Steve; Odika, Chiyo; Ryan, Robert

    2015-01-01

    If you are tasked with monitoring the IT infrastructure within your organization, this book demonstrates how System Center 2012 R2 Operations Manager offers a radical and exciting solution to modern administration.

  18. The Kepler Science Operations Center Pipeline Framework Extensions

    Science.gov (United States)

    Klaus, Todd C.; Cote, Miles T.; McCauliff, Sean; Girouard, Forrest R.; Wohler, Bill; Allen, Christopher; Chandrasekaran, Hema; Bryson, Stephen T.; Middour, Christopher; Caldwell, Douglas A.; hide

    2010-01-01

    The Kepler Science Operations Center (SOC) is responsible for several aspects of the Kepler Mission, including managing targets, generating on-board data compression tables, monitoring photometer health and status, processing the science data, and exporting the pipeline products to the mission archive. We describe how the generic pipeline framework software developed for Kepler is extended to achieve these goals, including pipeline configurations for processing science data and other support roles, and custom unit of work generators that control how the Kepler data are partitioned and distributed across the computing cluster. We describe the interface between the Java software that manages the retrieval and storage of the data for a given unit of work and the MATLAB algorithms that process these data. The data for each unit of work are packaged into a single file that contains everything needed by the science algorithms, allowing these files to be used to debug and evolve the algorithms offline.

  19. Test Rack Development for Extended Operation of Advanced Stirling Convertors at NASA Glenn Research Center

    Science.gov (United States)

    Dugala, Gina M.

    2010-01-01

    The U.S. Department of Energy, Lockheed Martin Space Systems Company, Sunpower Inc., and NASA Glenn Research Center (GRC) have been developing an Advanced Stirling Radioisotope Generator (ASRG) for use as a power system on space science missions. This generator will make use of free-piston Stirling convertors to achieve higher conversion efficiency than with currently available alternatives. One part of NASA GRC's support of ASRG development includes extended operation testing of Advanced Stirling Convertors (ASCs) developed by Sunpower Inc. and GRC. The ASC consists of a free-piston Stirling engine integrated with a linear alternator. NASA GRC has been building test facilities to support extended operation of the ASCs for several years. Operation of the convertors in the test facility provides convertor performance data over an extended period of time. One part of the test facility is the test rack, which provides a means for data collection, convertor control, and safe operation. Over the years, the test rack requirements have changed. The initial ASC test rack utilized an alternating-current (AC) bus for convertor control; the ASRG Engineering Unit (EU) test rack can operate with AC bus control or with an ASC Control Unit (ACU). A new test rack is being developed to support extended operation of the ASC-E2s with higher standards of documentation, component selection, and assembly practices. This paper discusses the differences among the ASC, ASRG EU, and ASC-E2 test racks.

  20. Secure, Network-Centric Operations of a Space-Based Asset: Cisco Router in Low Earth Orbit (CLEO) and Virtual Mission Operations Center (VMOC)

    Science.gov (United States)

    Ivancic, William; Stewart, Dave; Shell, Dan; Wood, Lloyd; Paulsen, Phil; Jackson, Chris; Hodgson, Dave; Notham, James; Bean, Neville; Miller, Eric

    2005-01-01

    This report documents the design of network infrastructure to support operations demonstrating the concept of network-centric operations and command and control of space-based assets. These demonstrations showcase major elements of the Transformal Communication Architecture (TCA), using Internet Protocol (IP) technology. These demonstrations also rely on IP technology to perform the functions outlined in the Consultative Committee for Space Data Systems (CCSDS) Space Link Extension (SLE) document. A key element of these demonstrations was the ability to securely use networks and infrastructure owned and/or controlled by various parties. This is a sanitized technical report for public release. There is a companion report available to a limited audience. The companion report contains detailed networking addresses and other sensitive material and is available directly from William Ivancic at Glenn Research Center.

  1. Dedication of Fermilab's LHC Remote Operations Center

    CERN Multimedia

    Claudia Marcelloni

    2007-01-01

    Fermilab's Remote Operations Center will be dedicated simultaneously at Fermilab in the U.S. and from CMS (Point 5) in Cessy, France. Speakers will include: from the U.S. DOE Undersecretary for Science Raymond Orbach and Fermilab Director Pier Oddone (U.S.); and from CERN Director General Robert Aymar, CMS Spokesperson Jim Virdee, LHC Project Leader Lyn Evans and US CMS Project Manager Joel Butler.

  2. System of automatic control over data Acquisition and Transmission to IGR NNC RK Data Center

    International Nuclear Information System (INIS)

    Komarov, I.I.; Gordienko, D.D.; Kunakov, A.V.

    2005-01-01

    Automated system for seismic and acoustic data acquisition and transmission in real time was established in Data Center IGR NNC RK, which functions very successively. The system monitors quality and volume of acquired information and also controls the status of the system and communication channels. Statistical data on system operation are accumulated in created database. Information on system status is reflected on the Center Web page. (author)

  3. Joint Space Operations Center (JSpOC) Mission System (JMS)

    Science.gov (United States)

    Morton, M.; Roberts, T.

    2011-09-01

    US space capabilities benefit the economy, national security, international relationships, scientific discovery, and our quality of life. Realizing these space responsibilities is challenging not only because the space domain is increasingly congested, contested, and competitive but is further complicated by the legacy space situational awareness (SSA) systems approaching end of life and inability to provide the breadth of SSA and command and control (C2) of space forces in this challenging domain. JMS will provide the capabilities to effectively employ space forces in this challenging domain. Requirements for JMS were developed based on regular, on-going engagement with the warfighter. The use of DoD Architecture Framework (DoDAF) products facilitated requirements scoping and understanding and transferred directly to defining and documenting the requirements in the approved Capability Development Document (CDD). As part of the risk reduction efforts, the Electronic System Center (ESC) JMS System Program Office (SPO) fielded JMS Capability Package (CP) 0 which includes an initial service oriented architecture (SOA) and user defined operational picture (UDOP) along with force status, sensor management, and analysis tools. Development efforts are planned to leverage and integrate prototypes and other research projects from Defense Advanced Research Projects Agency, Air Force Research Laboratories, Space Innovation and Development Center, and Massachusetts Institute of Technology/Lincoln Laboratories. JMS provides a number of benefits to the space community: a reduction in operational “transaction time” to accomplish key activities and processes; ability to process the increased volume of metric observations from new sensors (e.g., SBSS, SST, Space Fence), as well as owner/operator ephemerides thus enhancing the high accuracy near-real-time catalog, and greater automation of SSA data sharing supporting collaboration with government, civil, commercial, and foreign

  4. L-025: EPR-First Responders: Resource Coordinator and National Center for Emergency Operations

    International Nuclear Information System (INIS)

    2011-01-01

    This conference cover the importance of resource coordinator and the national Center for Emergency Operations which provides a stable environment installation and a valuable aid in the radiological emergency situation.The resources coordinator maintains the registers and resources located in general as well as the National Center for Emergency Operations is the ideal place for the public information Center. Both roles provide support and encourage the efforts to respond to the incident Command

  5. Secure, Autonomous, Intelligent Controller for Integrating Distributed Emergency Response Satellite Operations

    Science.gov (United States)

    Ivancic, William D.; Paulsen, Phillip E.; Miller, Eric M.; Sage, Steen P.

    2013-01-01

    This report describes a Secure, Autonomous, and Intelligent Controller for Integrating Distributed Emergency Response Satellite Operations. It includes a description of current improvements to existing Virtual Mission Operations Center technology being used by US Department of Defense and originally developed under NASA funding. The report also highlights a technology demonstration performed in partnership with the United States Geological Service for Earth Resources Observation and Science using DigitalGlobe(Registered TradeMark) satellites to obtain space-based sensor data.

  6. The current status of emergency operations at a high-volume cancer center.

    Science.gov (United States)

    Komori, Koji; Kimura, Kenya; Kinoshita, Takashi; Ito, Seiji; Abe, Tetsuya; Senda, Yoshiki; Misawa, Kazunari; Ito, Yuichi; Uemura, Norihisa; Natsume, Seiji; Kawai, Ryosuke; Kawakami, Jiro; Asano, Tomonari; Iwata, Yoshinori; Kurahashi, Shintaro; Tsutsuyama, Masayuki; Shigeyoshi, Itaru; Shimizu, Yasuhiro

    2014-01-01

    This study aimed to assess the pathogenic causes, clinical conditions, surgical procedures, in-hospital mortality, and operative death associated with emergency operations at a high-volume cancer center. Although many reports have described the contents, operative procedures, and prognosis of elective surgeries in high-volume cancer centers, emergency operations have not been studied in sufficient detail. We retrospectively enrolled 28 consecutive patients who underwent emergency surgery. Cases involving operative complications were excluded. The following surgical procedures were performed during emergency operations: closure in 3 cases (10.7%), diversion in 22 cases (78.6%), ileus treatment in 2 cases (7.1%), and hemostasis in 1 case (3.6%). Closure alone was performed only once for peritonitis. Diversion was performed in 17 cases (77.3%) of peritonitis, 4 cases (18.2%) of stenosis of the gastrointestinal tract, and 1 case (4.5%) of bleeding. There was a significant overall difference (P = 0.001). The frequency of emergency operations was very low at a high-volume cancer center. However, the recent shift in treatment approaches toward nonoperative techniques may enhance the status of emergency surgical procedures. The results presented in this study will help prepare for emergency situations and resolve them as quickly and efficiently as possible.

  7. Review and critique of April 10, 1985 exercise at the new NRC Operations Center

    International Nuclear Information System (INIS)

    Laats, E.T.; Charlton, T.R.; Bryan, G.R.; Beelman, R.J.; Bray, M.A.; Bethke, G.A.; King, M.A.

    1985-07-01

    An emergency preparedness training exercise was conducted. Objectives of the exercise addressed how well the new Operations Center was utilized when responding to an incident at a nuclear power plant. The simulated accident portrayed a small (approx.75 gpm) leak from the Turkey Point Unit 3 primary coolant system, that led to radionuclide release that exceeded EPA guidelines at the site boundary. The Operation Center response was led by NRC Chairman Nunzio J. Palladino and the roles of the simulated power plant and other outside organizations were jointly portrayed by EG and G Idaho, COMEX Corporation and the NRC's Office of Inspection and Enforcement. Overall, the exercise was successful. The new Operations Center facility provided capabilities and services never before available, which significantly aided the performance of the Operations Center staff. The various teams that manned the Center performed credibly. Substantial improvement in team performance was noted over the past several exercises

  8. Knowledge Management for Wireless Grid Operation Centers

    OpenAIRE

    Bordetsky, Alex; Dolk, Daniel

    2002-01-01

    Proceedings of the 35th Hawaii International Conference on System Sciences - 2002 Our objective is to develop generalized principles for grid operations centers that can be applied to specific domains. We focus on the domain of wireless telecommunications NOCs (WNOCs) as a starting point in this process. To address this problem, we focus specifically on the knowledge requirements for service-based decision support within wireless telecommunications. We use a Mission...

  9. Assessment of operators’ mental workload using physiological and subjective measures in cement, city traffic and power plant control centers

    Science.gov (United States)

    Fallahi, Majid; Motamedzade, Majid; Heidarimoghadam, Rashid; Soltanian, Ali Reza; Miyake, Shinji

    2016-01-01

    Background: The present study aimed to evaluate the operators’ mental workload (MW) of cement, city traffic control and power plant control centers using subjective and objective measures during system vital parameters monitoring. Methods: This cross-sectional study was conducted from June 2014 to February 2015 at the cement, city traffic control and power plant control centers. Electrocardiography and electroencephalography data were recorded from forty males during performing their daily working in resting, low mental workload (LMW), high mental workload (HMW) and recovery conditions (each block 5 minutes). The NASA-Task Load Index (TLX) was used to evaluate the subjective workload of the operators. Results: The results showed that increasing MW had a significant effect on the operators subjective responses in two conditions ([1,53] = 216.303, P < 0.001, η2 = 0.803). Also,the Task-MW interaction effect on operators subjective responses was significant (F [3, 53] = 12.628,P < 0.001, η2 = 0.417). Analysis of repeated measures analysis of variance (ANOVA) indicated that increasing mental demands had a significant effect on heart rate, low frequency/high frequency ratio, theta and alpha band activity. Conclusion: The results suggested that when operators’ mental demands especially in traffic control and power plant tasks increased, their mental fatigue and stress level increased and their mental health deteriorated. Therefore, it may be necessary to implement an ergonomic program or administrative control to manage mental probably health in these control centers. Furthermore, by evaluating MW, the control center director can organize the human resources for each MW condition to sustain the appropriate performance as well as improve system functions. PMID:27386425

  10. ONAV - An Expert System for the Space Shuttle Mission Control Center

    Science.gov (United States)

    Mills, Malise; Wang, Lui

    1992-01-01

    The ONAV (Onboard Navigation) Expert System is being developed as a real-time console assistant to the ONAV flight controller for use in the Mission Control Center at the Johnson Space Center. Currently, Oct. 1991, the entry and ascent systems have been certified for use on console as support tools, and were used for STS-48. The rendezvous system is in verification with the goal to have the system certified for STS-49, Intelsat retrieval. To arrive at this stage, from a prototype to real-world application, the ONAV project has had to deal with not only Al issues but operating environment issues. The Al issues included the maturity of Al languages and the debugging tools, verification, and availability, stability and size of the expert pool. The environmental issues included real time data acquisition, hardware suitability, and how to achieve acceptance by users and management.

  11. LOFT advanced control room operator diagnostic and display system (ODDS)

    International Nuclear Information System (INIS)

    Larsen, D.G.; Robb, T.C.

    1980-01-01

    The Loss-of-Fluid Test (LOFT) Reactor Facility in Idaho includes a highly instrumented nuclear reactor operated by the Department of Energy for the purpose of establishing nuclear safety requirements. The results of the development and installation into LOFT of an Operator Diagnostic and Display System (ODDS) are presented. The ODDS is a computer-based graphics display system centered around a PRIME 550 computer with several RAMTEK color graphic display units located within the control room and available to the reactor operators. Use of computer-based color graphics to aid the reactor operator is discussed. A detailed hardware description of the LOFT data system and the ODDS is presented. Methods and problems of backfitting the ODDS equipment into the LOFT plant are discussed

  12. Logistics Operations Management Center: Maintenance Support Baseline (LOMC-MSB)

    Science.gov (United States)

    Kurrus, R.; Stump, F.

    1995-01-01

    The Logistics Operations Management Center Maintenance Support Baseline is defined. A historical record of systems, applied to and deleted from, designs in support of future management and/or technical analysis is provided. All Flight elements, Ground Support Equipment, Facility Systems and Equipment and Test Support Equipment for which LOMC has responsibilities at Kennedy Space Center and other locations are listed. International Space Station Alpha Program documentation is supplemented. The responsibility of the Space Station Launch Site Support Office is established.

  13. Weather information integration in transportation management center (TMC) operations.

    Science.gov (United States)

    2011-01-02

    This report presents the results of the third phase of an on-going FHWA study on weather integration in Transportation Management Center (TMC) operations. The report briefly describes the earlier phases of the integration study, summarizes the findin...

  14. Using CONFIG for Simulation of Operation of Water Recovery Subsystems for Advanced Control Software Evaluation

    Science.gov (United States)

    Malin, Jane T.; Flores, Luis; Fleming, Land; Throop, Daiv

    2002-01-01

    A hybrid discrete/continuous simulation tool, CONFIG, has been developed to support evaluation of the operability life support systems. CON FIG simulates operations scenarios in which flows and pressures change continuously while system reconfigurations occur as discrete events. In simulations, intelligent control software can interact dynamically with hardware system models. CONFIG simulations have been used to evaluate control software and intelligent agents for automating life support systems operations. A CON FIG model of an advanced biological water recovery system has been developed to interact with intelligent control software that is being used in a water system test at NASA Johnson Space Center

  15. Report on the establishment and operation of the Federal Energy Regulatory Commission's Daycare Center

    Energy Technology Data Exchange (ETDEWEB)

    1991-09-16

    We have completed an inspection of the Federal Energy Regulatory Commission's (FERC) Daycare Center (Center). The purpose of the inspection was to review for efficiency, economy and compliance with laws and regulations, FERC's establishment and operation of the Center. The inspection objectives were to review: (1) FERC's compliance with Federal laws and requirements of the General Services Administration and the District of Columbia; (2) the source and amount of funds for establishing and operating the Center; and (3) the organizational relationships between FERC, the Center and the contractor operating the Center.

  16. The Final Count Down: A Review of Three Decades of Flight Controller Training Methods for Space Shuttle Mission Operations

    Science.gov (United States)

    Dittermore, Gary; Bertels, Christie

    2011-01-01

    Operations of human spaceflight systems is extremely complex; therefore, the training and certification of operations personnel is a critical piece of ensuring mission success. Mission Control Center (MCC-H), at the Lyndon B. Johnson Space Center in Houston, Texas, manages mission operations for the Space Shuttle Program, including the training and certification of the astronauts and flight control teams. An overview of a flight control team s makeup and responsibilities during a flight, and details on how those teams are trained and certified, reveals that while the training methodology for developing flight controllers has evolved significantly over the last thirty years the core goals and competencies have remained the same. In addition, the facilities and tools used in the control center have evolved. Changes in methodology and tools have been driven by many factors, including lessons learned, technology, shuttle accidents, shifts in risk posture, and generational differences. Flight controllers share their experiences in training and operating the space shuttle. The primary training method throughout the program has been mission simulations of the orbit, ascent, and entry phases, to truly train like you fly. A review of lessons learned from flight controller training suggests how they could be applied to future human spaceflight endeavors, including missions to the moon or to Mars. The lessons learned from operating the space shuttle for over thirty years will help the space industry build the next human transport space vehicle.

  17. Intelligent Systems Approach for Automated Identification of Individual Control Behavior of a Human Operator

    Science.gov (United States)

    Zaychik, Kirill B.; Cardullo, Frank M.

    2012-01-01

    Results have been obtained using conventional techniques to model the generic human operator?s control behavior, however little research has been done to identify an individual based on control behavior. The hypothesis investigated is that different operators exhibit different control behavior when performing a given control task. Two enhancements to existing human operator models, which allow personalization of the modeled control behavior, are presented. One enhancement accounts for the testing control signals, which are introduced by an operator for more accurate control of the system and/or to adjust the control strategy. This uses the Artificial Neural Network which can be fine-tuned to model the testing control. Another enhancement takes the form of an equiripple filter which conditions the control system power spectrum. A novel automated parameter identification technique was developed to facilitate the identification process of the parameters of the selected models. This utilizes a Genetic Algorithm based optimization engine called the Bit-Climbing Algorithm. Enhancements were validated using experimental data obtained from three different sources: the Manual Control Laboratory software experiments, Unmanned Aerial Vehicle simulation, and NASA Langley Research Center Visual Motion Simulator studies. This manuscript also addresses applying human operator models to evaluate the effectiveness of motion feedback when simulating actual pilot control behavior in a flight simulator.

  18. Based on Intelligent Robot of E-business Distribution Center Operation Mode Research

    Directory of Open Access Journals (Sweden)

    Li Juntao

    2016-01-01

    Full Text Available According to E-business distribution center operation mode in domestic and advanced experience drawing lessons at home and abroad, this paper based on intelligent robot researches E-business distribution center operation mode. And it proposes the innovation logistics storage in E-business and sorting integration system, and elaborates its principle, characteristics, as well as studies its business mode and logistics process, and its parameters and working mode of AGV equipment.

  19. Remote control scanning electron microscope with Web operation

    International Nuclear Information System (INIS)

    Yamada, A.; Hirahara, O.; Date, M.; Lozbin, V.; Tsuchida, T.; Sugano, N.

    2002-01-01

    part of the SEM control can set up of the observation condition such as a usual acceleration voltage, magnification by the button choice in observation screen. You must do a stage movement even during the SEM control to do image observation specially, too. But, when a stage is moved via LAN, JOYSTICK operation is difficult for continuous movement because the refresh rate of image is delayed with traffic of LAN. Therefore, we don't use continues movement. We use stage centering method that the click the position to want to move it on the image and automatically move to center of the image. There are no relations in the traffic of the network circuit, and it can move it in the center of the observation screen securely through the place of the purpose by this method. We made the remote control function of SEM and displayed the SEM image on the WEB browser (Internet Explorer). In this format, any special software is not necessary, and the SEM can be operate on a general WEB browser. Therefore, it does not need to fix client PC. Copyright (2002) Australian Society for Electron Microscopy Inc

  20. Alarm management in TRANSPETRO National Oil Control Center

    Energy Technology Data Exchange (ETDEWEB)

    Amado, Helio; Costa, Luciano [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil)

    2009-07-01

    For sure Alarm Management is not a new issue. EEMUA 191 has been around since 1999 and everyone has received visits from consultants in this area. Besides this regulators have requested that operators have a policy for it. However there are few papers showing actual pipeline operator experience in alarm management. In this paper we present the work developed in TRANSPETRO National Oil Control Center since 2006, where we operate 5509 km of crude oil and refined products pipelines. Since the beginning of the centralized operation in 2002, alarm management has been a concern but a systematic approach has been taken since 2006. Initially we will make a brief revision of the literature and show trends for regulations. Then we will show the tools and the approach we have taken. Finally, the further developments we see. The point that we want to discuss is that, it has been very difficult to implement the system in a linear way and we believe that companies that have huge legacy systems, the same probably will occur. Putting in simple words, our main conclusion is: Implementing an Alarm Management policy produces good results however probably sometimes is better not to follow strictly the traditional steps. (author)

  1. Database created with the operation of environmental monitoring program from the Nuclear Technology Development Center (CDTN) - Brazilian CNEN

    International Nuclear Information System (INIS)

    Peixoto, C.M.

    1995-01-01

    The environmental control from the Nuclear Technology Development Center (CDTN - Brazilian CNEN) is done through a Program of Environmental Monitoring-PMA, which has been in operation since 1985. To register all the analytic results of the several samples, samples, a database was created. In this work, this database structure as well as the information used in the evaluation of the results obtained from the operation of the above-mentioned PMA are presented. (author). 5 refs, 1 fig, 3 tabs

  2. System security in the space flight operations center

    Science.gov (United States)

    Wagner, David A.

    1988-01-01

    The Space Flight Operations Center is a networked system of workstation-class computers that will provide ground support for NASA's next generation of deep-space missions. The author recounts the development of the SFOC system security policy and discusses the various management and technology issues involved. Particular attention is given to risk assessment, security plan development, security implications of design requirements, automatic safeguards, and procedural safeguards.

  3. RoboCon: A general purpose telerobotic control center

    Energy Technology Data Exchange (ETDEWEB)

    Draper, J.V.; Noakes, M.W. [Oak Ridge National Lab., TN (United States). Robotics and Process Systems Div.; Schempf, H. [Carnegie Mellon Univ., Pittsburgh, PA (United States); Blair, L.M. [Human Machine Interfaces, Inc., Knoxville, TN (United States)

    1997-02-01

    This report describes human factors issues involved in the design of RoboCon, a multi-purpose control center for use in US Department of Energy remote handling applications. RoboCon is intended to be a flexible, modular control center capable of supporting a wide variety of robotic devices.

  4. RoboCon: A general purpose telerobotic control center

    International Nuclear Information System (INIS)

    Draper, J.V.; Noakes, M.W.; Blair, L.M.

    1997-01-01

    This report describes human factors issues involved in the design of RoboCon, a multi-purpose control center for use in US Department of Energy remote handling applications. RoboCon is intended to be a flexible, modular control center capable of supporting a wide variety of robotic devices

  5. WFIRST: User and mission support at ISOC - IPAC Science Operations Center

    Science.gov (United States)

    Akeson, Rachel; Armus, Lee; Bennett, Lee; Colbert, James; Helou, George; Kirkpatrick, J. Davy; Laine, Seppo; Meshkat, Tiffany; Paladini, Roberta; Ramirez, Solange; Wang, Yun; Xie, Joan; Yan, Lin

    2018-01-01

    The science center for WFIRST is distributed between the Goddard Space Flight Center, the Infrared Processing and Analysis Center (IPAC) and the Space Telescope Science Institute (STScI). The main functions of the IPAC Science Operations Center (ISOC) are:* Conduct the GO, archival and theory proposal submission and evaluation process* Support the coronagraph instrument, including observation planning, calibration and data processing pipeline, generation of data products, and user support* Microlensing survey data processing pipeline, generation of data products, and user support* Community engagement including conferences, workshops and general support of the WFIRST exoplanet communityWe will describe the components planned to support these functions and the community of WFIRST users.

  6. Mathematical model for adaptive control system of ASEA robot at Kennedy Space Center

    Science.gov (United States)

    Zia, Omar

    1989-01-01

    The dynamic properties and the mathematical model for the adaptive control of the robotic system presently under investigation at Robotic Application and Development Laboratory at Kennedy Space Center are discussed. NASA is currently investigating the use of robotic manipulators for mating and demating of fuel lines to the Space Shuttle Vehicle prior to launch. The Robotic system used as a testbed for this purpose is an ASEA IRB-90 industrial robot with adaptive control capabilities. The system was tested and it's performance with respect to stability was improved by using an analogue force controller. The objective of this research project is to determine the mathematical model of the system operating under force feedback control with varying dynamic internal perturbation in order to provide continuous stable operation under variable load conditions. A series of lumped parameter models are developed. The models include some effects of robot structural dynamics, sensor compliance, and workpiece dynamics.

  7. Development of the automatic control rod operation system for JOYO. Verification of automatic control rod operation guide system

    International Nuclear Information System (INIS)

    Terakado, Tsuguo; Suzuki, Shinya; Kawai, Masashi; Aoki, Hiroshi; Ohkubo, Toshiyuki

    1999-10-01

    The automatic control rod operation system was developed to control the JOYO reactor power automatically in all operation modes(critical approach, cooling system heat up, power ascent, power descent), development began in 1989. Prior to applying the system, verification tests of the automatic control rod operation guide system was conducted during 32nd duty cycles of JOYO' from Dec. 1997 to Feb. 1998. The automatic control rod operation guide system consists of the control rod operation guide function and the plant operation guide function. The control rod operation guide function provides information on control rod movement and position, while the plant operation guide function provide guidance for plant operations corresponding to reactor power changes(power ascent or power descent). Control rod insertion or withdrawing are predicted by fuzzy algorithms. (J.P.N.)

  8. Virtualized Multi-Mission Operations Center (vMMOC) and its Cloud Services

    Science.gov (United States)

    Ido, Haisam Kassim

    2017-01-01

    His presentation will cover, the current and future, technical and organizational opportunities and challenges with virtualizing a multi-mission operations center. The full deployment of Goddard Space Flight Centers (GSFC) Virtualized Multi-Mission Operations Center (vMMOC) is nearly complete. The Space Science Mission Operations (SSMO) organizations spacecraft ACE, Fermi, LRO, MMS(4), OSIRIS-REx, SDO, SOHO, Swift, and Wind are in the process of being fully migrated to the vMMOC. The benefits of the vMMOC will be the normalization and the standardization of IT services, mission operations, maintenance, and development as well as ancillary services and policies such as collaboration tools, change management systems, and IT Security. The vMMOC will also provide operational efficiencies regarding hardware, IT domain expertise, training, maintenance and support.The presentation will also cover SSMO's secure Situational Awareness Dashboard in an integrated, fleet centric, cloud based web services fashion. Additionally the SSMO Telemetry as a Service (TaaS) will be covered, which allows authorized users and processes to access telemetry for the entire SSMO fleet, and for the entirety of each spacecrafts history. Both services leverage cloud services in a secure FISMA High and FedRamp environment, and also leverage distributed object stores in order to house and provide the telemetry. The services are also in the process of leveraging the cloud computing services elasticity and horizontal scalability. In the design phase is the Navigation as a Service (NaaS) which will provide a standardized, efficient, and normalized service for the fleet's space flight dynamics operations. Additional future services that may be considered are Ground Segment as a Service (GSaaS), Telemetry and Command as a Service (TCaaS), Flight Software Simulation as a Service, etc.

  9. Poison control center - emergency number

    Science.gov (United States)

    For a POISON EMERGENCY call: 1-800-222-1222 ANYWHERE IN THE UNITED STATES This national hotline number will let you ... is a free and confidential service. All local poison control centers in the United States use this ...

  10. The German simulator center for the training of nuclear power plant operators

    International Nuclear Information System (INIS)

    Hoffmann, E.

    1996-01-01

    Simulator training for nuclear power plant operators in Germany is conducted in The Simulator Center in Essen. The companies operating The Center are KSG/GfS. KSG provides simulators, GfS performs the training. The German Simulator Center is equipped with five simulators in training, nine simulators are under construction and will be ready for training until the beginning of 1997. This institution serves 22 nuclear power plants units in Germany, Switzerland (NPP Goesgen-Daeniken) and the Netherlands (NPP Borssele) and trains 1,800 persons every year. As a common enterprise the company is owned by 12 utilities, which leads to the necessity to prepare common rules and guidelines for simulator specification, training of instructors, assessment of trainees, training material and preparation and methodical running of simulator courses

  11. 49 CFR 236.777 - Operator, control.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Operator, control. 236.777 Section 236.777..., MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Definitions § 236.777 Operator, control. An employee assigned to operate the control machine of a traffic control system. ...

  12. Initial Flight Test of the Production Support Flight Control Computers at NASA Dryden Flight Research Center

    Science.gov (United States)

    Carter, John; Stephenson, Mark

    1999-01-01

    The NASA Dryden Flight Research Center has completed the initial flight test of a modified set of F/A-18 flight control computers that gives the aircraft a research control law capability. The production support flight control computers (PSFCC) provide an increased capability for flight research in the control law, handling qualities, and flight systems areas. The PSFCC feature a research flight control processor that is "piggybacked" onto the baseline F/A-18 flight control system. This research processor allows for pilot selection of research control law operation in flight. To validate flight operation, a replication of a standard F/A-18 control law was programmed into the research processor and flight-tested over a limited envelope. This paper provides a brief description of the system, summarizes the initial flight test of the PSFCC, and describes future experiments for the PSFCC.

  13. Human reliability and the control of continuous processes: case study of TRANSPETRO gas control center room; A confiabilidade humana no controle de processos continuos: estudo de caso no centro de controle de gasodutos da TRANSPETRO

    Energy Technology Data Exchange (ETDEWEB)

    Santos, Venetia; Zamberlan, Maria Cristina; Setti, Egle [Instituto Nacional de Tecnologia (INT), Rio de Janeiro, RJ (Brazil); Faertes, Denise; Figueiras, Luciana Heil; Marques, Arnaldo; Franca, Andre Guedes da [PETROBRAS Transporte S.A. (TRANSPETRO), Rio de Janeiro, RJ (Brazil); Diniz, Vaner; Melo, Paulo Fernando Ferreira Frutuoso e [Universidade Federal, Rio de Janeiro, RJ (Brazil). Coordenacao dos Programas de Pos-graduacao de Engenharia. Programa de Engenharia Nuclear

    2005-07-01

    This review presents a study using data from the activities of control of operations into the Center of Control Operational of Gas pipelines from TRANSPETRO. These study used the methodology of Analysis Ergonomic of Work (AET). Twenty hours of systematic observation have been performed from the activities of the operators and the supervisors into the CCG in different shifts with different staffs. The data obtained reveals the dynamics from the activities of control facing the increase of automation as well the strategies and adjustments that are performed by the operators with the increase of complexity of the systems they shall control. With the treatment of data we verify that occurs an important increasing of the activities, that interferes on to another, and that generates the loss of cooperation between operators, errors on the exchanges of information and so on. The survey from real activity at work was fundamental for the apprehension of the existing risks and for the generation of proposals to the improvement of the control of the process in the CCG. (author)

  14. An annotated outline for a traffic management center operations manual

    Science.gov (United States)

    2000-10-01

    This draft Traffic Management Center (TMC) and Operations manual outline is meant to serve as a model "checklist" for the development of similar manuals used in deployed environments. The purpose of this outline is to provide a reference for agencies...

  15. Co-operatives and Normative Control

    DEFF Research Database (Denmark)

    Bregn, Kirsten; Jagd, Søren

    1992-01-01

    This paper explores the conditions for applying normative control in co-operatives. For normative control to be effective two conditions are found particularly important: Individuals must be morally involved and the organization must have a system of making it possible to link common norms...... and individual action. If these conditions are not fulfilled, as may be the case in many co-operatives, normative control cannot be expected to work. The problems of normative control in co-operatives may then not be caused by the use of normative control as such, but may instead be a problem of securing...

  16. Shuttle Flight Operations Contract Generator Maintenance Facility Land Use Control Implementation Plan (LUCIP)

    Science.gov (United States)

    Applegate, Joseph L.

    2014-01-01

    This Land Use Control Implementation Plan (LUCIP) has been prepared to inform current and potential future users of the Kennedy Space Center (KSC) Shuttle Flight Operations Contract Generator Maintenance Facility (SFOC; SWMU 081; "the Site") of institutional controls that have been implemented at the Site1. Although there are no current unacceptable risks to human health or the environment associated with the SFOC, an institutional land use control (LUC) is necessary to prevent human health exposure to antimony-affected groundwater at the Site. Controls will include periodic inspection, condition certification, and agency notification.

  17. A source-controlled data center network model.

    Science.gov (United States)

    Yu, Yang; Liang, Mangui; Wang, Zhe

    2017-01-01

    The construction of data center network by applying SDN technology has become a hot research topic. The SDN architecture has innovatively separated the control plane from the data plane which makes the network more software-oriented and agile. Moreover, it provides virtual multi-tenancy, effective scheduling resources and centralized control strategies to meet the demand for cloud computing data center. However, the explosion of network information is facing severe challenges for SDN controller. The flow storage and lookup mechanisms based on TCAM device have led to the restriction of scalability, high cost and energy consumption. In view of this, a source-controlled data center network (SCDCN) model is proposed herein. The SCDCN model applies a new type of source routing address named the vector address (VA) as the packet-switching label. The VA completely defines the communication path and the data forwarding process can be finished solely relying on VA. There are four advantages in the SCDCN architecture. 1) The model adopts hierarchical multi-controllers and abstracts large-scale data center network into some small network domains that has solved the restriction for the processing ability of single controller and reduced the computational complexity. 2) Vector switches (VS) developed in the core network no longer apply TCAM for table storage and lookup that has significantly cut down the cost and complexity for switches. Meanwhile, the problem of scalability can be solved effectively. 3) The SCDCN model simplifies the establishment process for new flows and there is no need to download flow tables to VS. The amount of control signaling consumed when establishing new flows can be significantly decreased. 4) We design the VS on the NetFPGA platform. The statistical results show that the hardware resource consumption in a VS is about 27% of that in an OFS.

  18. A source-controlled data center network model

    Science.gov (United States)

    Yu, Yang; Liang, Mangui; Wang, Zhe

    2017-01-01

    The construction of data center network by applying SDN technology has become a hot research topic. The SDN architecture has innovatively separated the control plane from the data plane which makes the network more software-oriented and agile. Moreover, it provides virtual multi-tenancy, effective scheduling resources and centralized control strategies to meet the demand for cloud computing data center. However, the explosion of network information is facing severe challenges for SDN controller. The flow storage and lookup mechanisms based on TCAM device have led to the restriction of scalability, high cost and energy consumption. In view of this, a source-controlled data center network (SCDCN) model is proposed herein. The SCDCN model applies a new type of source routing address named the vector address (VA) as the packet-switching label. The VA completely defines the communication path and the data forwarding process can be finished solely relying on VA. There are four advantages in the SCDCN architecture. 1) The model adopts hierarchical multi-controllers and abstracts large-scale data center network into some small network domains that has solved the restriction for the processing ability of single controller and reduced the computational complexity. 2) Vector switches (VS) developed in the core network no longer apply TCAM for table storage and lookup that has significantly cut down the cost and complexity for switches. Meanwhile, the problem of scalability can be solved effectively. 3) The SCDCN model simplifies the establishment process for new flows and there is no need to download flow tables to VS. The amount of control signaling consumed when establishing new flows can be significantly decreased. 4) We design the VS on the NetFPGA platform. The statistical results show that the hardware resource consumption in a VS is about 27% of that in an OFS. PMID:28328925

  19. Transitioning to Intel-based Linux Servers in the Payload Operations Integration Center

    Science.gov (United States)

    Guillebeau, P. L.

    2004-01-01

    The MSFC Payload Operations Integration Center (POIC) is the focal point for International Space Station (ISS) payload operations. The POIC contains the facilities, hardware, software and communication interface necessary to support payload operations. ISS ground system support for processing and display of real-time spacecraft and telemetry and command data has been operational for several years. The hardware components were reaching end of life and vendor costs were increasing while ISS budgets were becoming severely constrained. Therefore it has been necessary to migrate the Unix portions of our ground systems to commodity priced Intel-based Linux servers. hardware architecture including networks, data storage, and highly available resources. This paper will concentrate on the Linux migration implementation for the software portion of our ground system. The migration began with 3.5 million lines of code running on Unix platforms with separate servers for telemetry, command, Payload information management systems, web, system control, remote server interface and databases. The Intel-based system is scheduled to be available for initial operational use by August 2004 The overall migration to Intel-based Linux servers in the control center involves changes to the This paper will address the Linux migration study approach including the proof of concept, criticality of customer buy-in and importance of beginning with POSlX compliant code. It will focus on the development approach explaining the software lifecycle. Other aspects of development will be covered including phased implementation, interim milestones and metrics measurements and reporting mechanisms. This paper will also address the testing approach covering all levels of testing including development, development integration, IV&V, user beta testing and acceptance testing. Test results including performance numbers compared with Unix servers will be included. need for a smooth transition while maintaining

  20. Research on operation and maintenance support system adaptive to human recognition and understanding in human-centered plant

    International Nuclear Information System (INIS)

    Numano, Masayoshi; Matsuoka, Takeshi; Mitomo, N.

    2004-01-01

    As a human-centered plant, advanced nuclear power plant needs appropriate role sharing between human and mobile intelligent agents. Human-machine cooperation for plant operation and maintenance activities is also required with an advanced interface. Plant's maintenance is programmed using mobile robots working under the radiation environments instead of human beings. Operation and maintenance support system adaptive to human recognition and understanding should be developed to establish adequate human and machine interface so as to induce human capabilities to the full and enable human to take responsibility for plan's operation. Plant's operation and maintenance can be cooperative activities between human and intelligent automonous agents having surveillance and control functions. Infrastructure of multi-agent simulation system for the support system has been investigated and developed based on work plans derived from the scheduler. (T. Tanaka)

  1. Outsourcing of Defense Supply Center, Columbus, Bus and Taxi Service Operations

    National Research Council Canada - National Science Library

    Granetto, Paul

    1999-01-01

    Introduction. We performed the audit in response to allegations to the Defense Hotline that the Defense Supply Center, Columbus, outsourcing study for bus and taxi service operations was based on incorrect methodology...

  2. Intelligent Control of Micro Grid: A Big Data-Based Control Center

    Science.gov (United States)

    Liu, Lu; Wang, Yanping; Liu, Li; Wang, Zhiseng

    2018-01-01

    In this paper, a structure of micro grid system with big data-based control center is introduced. Energy data from distributed generation, storage and load are analized through the control center, and from the results new trends will be predicted and applied as a feedback to optimize the control. Therefore, each step proceeded in micro grid can be adjusted and orgnized in a form of comprehensive management. A framework of real-time data collection, data processing and data analysis will be proposed by employing big data technology. Consequently, a integrated distributed generation and a optimized energy storage and transmission process can be implemented in the micro grid system.

  3. Set up and operation for medical radiation exposure quality control system of health promotion center

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jung Su; Kim, Jung Min [Korea University,Seoul (Korea, Republic of); Jung, Hae Kyoung [Dept. of Diagnostic Radiology, CHA Bundang Medical Center, CHA University, Sungnam (Korea, Republic of)

    2016-03-15

    In this study, standard model of medical radiation dosage quality control system will be suggested and the useful of this system in clinical field will be reviewed. Radiation dosage information of modalities are gathered from digital imaging and communications in medicine(DICOM) standard data(such as DICOM dose SR and DICOM header) and stored in database. One CT scan, two digital radiography modalities and two mammography modalities in one health promotion center in Seoul are used to derive clinical data for one month. After 1 months research with 703 CT scans, the study shows CT 357.9 mGy·cm in abdomen and pelvic CT, 572.4 mGy·cm in brain without CT, 55.9 mGy·cm in calcium score/heart CT, screening CT at 54 mGy·cm in chest screening CT(low dose screening CT scan), 284.99 mGy·cm in C-spine CT and 341.85 mGy·cm in L-spine CT as health promotion center reference level of each exam. And with 1955 digital radiography cases, it shows 274.0 mGy·cm{sup 2} and for mammography 6.09 mGy is shown based on 536 cases. The use of medical radiation shall comply with the principles of justification and optimization. This quality management of medical radiation exposure must be performed in order to follow the principle. And the procedure to reduce the radiation exposure of patients and staff can be achieved through this. The results of this study can be applied as a useful tool to perform the quality control of medical radiation exposure.

  4. Set up and operation for medical radiation exposure quality control system of health promotion center

    International Nuclear Information System (INIS)

    Kim, Jung Su; Kim, Jung Min; Jung, Hae Kyoung

    2016-01-01

    In this study, standard model of medical radiation dosage quality control system will be suggested and the useful of this system in clinical field will be reviewed. Radiation dosage information of modalities are gathered from digital imaging and communications in medicine(DICOM) standard data(such as DICOM dose SR and DICOM header) and stored in database. One CT scan, two digital radiography modalities and two mammography modalities in one health promotion center in Seoul are used to derive clinical data for one month. After 1 months research with 703 CT scans, the study shows CT 357.9 mGy·cm in abdomen and pelvic CT, 572.4 mGy·cm in brain without CT, 55.9 mGy·cm in calcium score/heart CT, screening CT at 54 mGy·cm in chest screening CT(low dose screening CT scan), 284.99 mGy·cm in C-spine CT and 341.85 mGy·cm in L-spine CT as health promotion center reference level of each exam. And with 1955 digital radiography cases, it shows 274.0 mGy·cm"2 and for mammography 6.09 mGy is shown based on 536 cases. The use of medical radiation shall comply with the principles of justification and optimization. This quality management of medical radiation exposure must be performed in order to follow the principle. And the procedure to reduce the radiation exposure of patients and staff can be achieved through this. The results of this study can be applied as a useful tool to perform the quality control of medical radiation exposure

  5. Centers for Disease Control and Prevention

    Science.gov (United States)

    ... PDF file Microsoft PowerPoint file Microsoft Word file Microsoft Excel ... Centers for Disease Control and Prevention Page maintained by: Office of Associate Director of Communication, Division of Public ...

  6. Automatic operation device for control rods

    International Nuclear Information System (INIS)

    Sekimizu, Koichi

    1984-01-01

    Purpose: To enable automatic operation of control rods based on the reactor operation planning, and particularly, to decrease the operator's load upon start up and shutdown of the reactor. Constitution: Operation plannings, demand for the automatic operation, break point setting value, power and reactor core flow rate change, demand for operation interrupt, demand for restart, demand for forecasting and the like are inputted to an input device, and an overall judging device performs a long-term forecast as far as the break point by a long-term forecasting device based on the operation plannings. The automatic reactor operation or the like is carried out based on the long-term forecasting and the short time forecasting is performed by the change in the reactor core status due to the control rod operation sequence based on the control rod pattern and the operation planning. Then, it is judged if the operation for the intended control rod is possible or not based on the result of the short time forecasting. (Aizawa, K.)

  7. How the Station will operate. [operation, management, and maintenance in space

    Science.gov (United States)

    Cox, John T.

    1988-01-01

    Aspects of the upcoming operational phase of the Space Station (SS) are examined. What the crew members will do with their time in their specialized roles is addressed. SS maintenance and servicing and the interaction of the SS Control Center with Johnson Space Center is discussed. The planning of payload operations and strategic planning for the SS are examined.

  8. Autonomous Operations System: Development and Application

    Science.gov (United States)

    Toro Medina, Jaime A.; Wilkins, Kim N.; Walker, Mark; Stahl, Gerald M.

    2016-01-01

    Autonomous control systems provides the ability of self-governance beyond the conventional control system. As the complexity of mechanical and electrical systems increases, there develops a natural drive for developing robust control systems to manage complicated operations. By closing the bridge between conventional automated systems to knowledge based self-awareness systems, nominal control of operations can evolve into relying on safe critical mitigation processes to support any off-nominal behavior. Current research and development efforts lead by the Autonomous Propellant Loading (APL) group at NASA Kennedy Space Center aims to improve cryogenic propellant transfer operations by developing an automated control and health monitoring system. As an integrated systems, the center aims to produce an Autonomous Operations System (AOS) capable of integrating health management operations with automated control to produce a fully autonomous system.

  9. IMPROVEMENT OF BUS OPERATIONAL CHARACTERISTICS WHILE USING INTEGRATED CONTROL OF SUSPENSION AND TRANSMISSION

    Directory of Open Access Journals (Sweden)

    V. V. Mikhailau

    2016-01-01

    Full Text Available Semi-natural tests for active pneumatic suspension of a 18-tonne tourist bus with the system of automatic body stabilization of the mobile machine and feed-back coupling according to kinematics parameter. The test have been executed in the cases when the bus is stocked with an automatic hydro-mechanical transmission in the process of speed picking up, gear-changing or road braking which is assigned by accidental road humps. A computer simulation of dynamic structures in combination with virtual devices and real objects (HIL – Hardware-in-the-Loop Simulation has been carried in the paper. Personal computers, software, programmed logic controller, frequency generator, solenoid-operated valve have been used for the investigation process. The paper proposes an unconventional method for improvement operational characteristics which is based on integrated control of a suspension and automatic hydro-mechanical transmission. A mathematical model includes systems of automatic transmission, suspension and module for generation of accidental road humps. The model has been considered as a basis for semi-natural laboratory bench with industrially-manufactured controller, other components of automatic systems and standard control organs. The most efficient method for body stabilization is control of the suspension according to the parameter of angular rate during vertical turn of an automobile’s center line with a turning point in the center of mass. The developed algorithm and stabilization system according to angular rate of body’s center line turning have made it possible to improve dynamics of the bus while making gear-changing and to reduce fuel consumption during starting-up and speed picking-up processes. During the braking process such system simultaneously decreases oscillation amplitude of some parameters more than two-fold.

  10. Operation for Rokkasho Low Level Radioactive Waste Disposal Center

    International Nuclear Information System (INIS)

    Kamizono, Hideki

    2008-01-01

    The Rokkasho Low Level Radioactive Waste (LLW) Disposal Center is located in Oishitai, Rokkasho-mura, Kamikitagun, of Aomori Prefecture. This district is situated in the southern part of Shimohita Peninsula in the northeastern corner of the prefecture, which lies at the northern tip of Honshu, Japan's main island. The Rokkasho LLW Disposal Center deals with only LLW generated by operating of nuclear power plants. The No.1 and No.2 disposal facility are now in operation. The disposal facilities in operation have a total dispose capacity of 80,000m 3 (equivalent to 400,000 drums). Our final business scope is to dispose of radioactive waste corresponding to 600,000 m 3 (equivalent to 3000,000 drums). For No.1 disposal facility, we have been disposing of homogeneous waste, including condensed liquid waste, spent resin, solidified with cement and asphalt, etc. For No.2 disposal facility, we can bury a solid waste solidified with mortar, such as activated metals and plastics, etc. Using an improved construction technology for an artificial barrier, the concrete pits in No.2 disposal facility could be constructed more economical and spacious than that of No.1. Both No.1 and No.2 facility will be able to bury about 200,000 waste packages (drums) each corresponding to 40,000 m 3 . As of March 17, 2008, Approximately 200,00 waste drums summing up No.1 and No.2 disposal facility have been received from Nuclear power plants and buried. (author)

  11. Enterprise Level Status and Control of Multi-Satellite Operations

    Data.gov (United States)

    National Aeronautics and Space Administration — Single-satellite mission operation centers are used for nearly all Goddard Space Flight Center (GSFC) mission ground data systems, with a focus on localized data...

  12. Strategies and Decision Support Systems for Integrating Variable Energy Resources in Control Centers for Reliable Grid Operations

    Energy Technology Data Exchange (ETDEWEB)

    Jones, Lawrence E. [Alstom Grid Inc., Washington, DC (United States)

    2011-11-01

    This report provides findings from the field regarding the best ways in which to guide operational strategies, business processes and control room tools to support the integration of renewable energy into electrical grids.

  13. Method of controlling the reactor operation

    International Nuclear Information System (INIS)

    Ishiguro, Akira; Nakakura, Hiroyuki.

    1987-01-01

    Purpose: To moderate vibratory response due to delayed operation thereby obtain stable controlled response in the operation control for a PWR type reactor. Method: the reactor operation is controlled by the axial power distribution control by regulating the boron concentration in primary coolants with a boron density control system and controlling the average temperature for the primary coolants with the control rod control system. In this case, the control operation and the control response become instable due to transmission delay, etc. of aqueous boric acid injection to the primary coolant circuits to result in vibratory response. In the present invention, signals are prepared by adding the amount in proportion to the variation coefficient with time of xenone concentration obtained from the measured value for the reactor power added to the conventional axial power distribution parameter deviation and used as the input signals for the boron concentration control system. As a result, the instability due to the transmission delay of the aqueous boric acid injection is improved by the preceding control by the amount in proportion with the variation coefficient with time of the xenone concentration. An advantageous effect can be expected for the load following operation during day time according to the present invention. (Kamimura, M.)

  14. A control center design revisited: learning from users’ appropriation

    DEFF Research Database (Denmark)

    Souza da Conceição, Carolina; Cordeiro, Cláudia

    2014-01-01

    This paper aims to present the lessons learned during a control center design project by revisiting another control center from the same company designed two and a half years before by the same project team. In light of the experience with the first project and its analysis, the designers and res...

  15. Operation control device under radiation exposure

    International Nuclear Information System (INIS)

    Kimura, Kiichi; Murakami, Toichi.

    1994-01-01

    The device of the present invention performs smooth progress of operation by remote control for a plurality of operations in periodical inspections in controlled areas of a nuclear power plant, thereby reducing the operator's exposure dose. Namely, the device monitors the progressing state of the operation by displaying the progress of operation on a CRT of a centralized control device present in a low dose area remote from an operation field through an ITV camera disposed in the vicinity of the operation field. Further, operation sequence and operation instruction procedures previously inputted in the device are indicated to the operation field through an operation instruction outputting device (field CRT) in accordance with the progress of the operation steps. On the other hand, the operation progress can be aided by inputting information from the operation field such as start or completion of the operation steps. Further, the device of the present invention can monitor the change of operation circumstances and exposure dose of operators based on the information from a radiation dose measuring device disposed in the operation circumstance and to individual operators. (I.S.)

  16. Vocal symptoms, voice activity, and participation profile and professional performance of call center operators.

    Science.gov (United States)

    Piwowarczyk, Tatiana Carvalho; Oliveira, Gisele; Lourenço, Luciana; Behlau, Mara

    2012-03-01

    To analyze the phonatory and laryngopharyngeal symptoms reported by call center operators; and quantify the impact of these symptoms on quality of life, and the association between these issues and professional performance, number of monthly calls, and number of missed workdays. Call center operators (n=157) from a billing call center completed the Vocal Signs and Symptoms Questionnaire and the Brazilian version of the Voice Activity and Participation Profile (VAPP). The company provided data regarding professional performance, average number of monthly calls, and number of missed workdays for each employee. The mean number of current symptoms (6.8) was greater in the operators than data for the general population (1.7). On average, 4.2 symptoms were attributed to occupational factors. The average number of symptoms did not correlate with professional performance (P=0.571). However, fewer symptoms correlated with decreased missed workdays and higher mean monthly call figures. The VAPP scores were relatively low, suggesting little impact of voice difficulties on call center operator's quality of life. However, subjects with elevated VAPP scores also had poorer professional performance. The presence of vocal symptoms does not necessarily relate to decreased professional performance. However, an association between higher vocal activity limitation and participation scores and poorer professional performance was observed. Copyright © 2012 The Voice Foundation. Published by Mosby, Inc. All rights reserved.

  17. Identifying representative symbology for low visibility operations/surface movement guidance and control system (LVO/SMGCS) paper charts

    Science.gov (United States)

    2015-05-04

    The Volpe Center developed a questionnaire to examine the representativeness of symbol shapes and the usefulness of information depicted on Low Visibility Operations/Surface Movement Guidance and Control System (LVO/SMGCS) paper charts. One-hundred f...

  18. Status Report on the Development of Micro-Scheduling Software for the Advanced Outage Control Center Project

    Energy Technology Data Exchange (ETDEWEB)

    Germain, Shawn St. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Thomas, Kenneth [Idaho National Lab. (INL), Idaho Falls, ID (United States); Farris, Ronald [Idaho National Lab. (INL), Idaho Falls, ID (United States); Joe, Jeffrey [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-09-01

    The long-term viability of existing nuclear power plants (NPPs) in the United States (U.S.) is dependent upon a number of factors, including maintaining high capacity factors, maintaining nuclear safety, and reducing operating costs, particularly those associated with refueling outages. Refueling outages typically take 20-30 days, and for existing light water NPPs in the U.S., the reactor cannot be in operation during the outage. Furthermore, given that many NPPs generate between $1-1.5 million/day in revenue when in operation, there is considerable interest in shortening the length of refueling outages. Yet, refueling outages are highly complex operations, involving multiple concurrent and dependent activities that are difficult to coordinate. Finding ways to improve refueling outage performance while maintaining nuclear safety has proven to be difficult. The Advanced Outage Control Center project is a research and development (R&D) demonstration activity under the Light Water Reactor Sustainability (LWRS) Program. LWRS is a R&D program which works with industry R&D programs to establish technical foundations for the licensing and managing of long-term, safe, and economical operation of current NPPs. The Advanced Outage Control Center project has the goal of improving the management of commercial NPP refueling outages. To accomplish this goal, this INL R&D project is developing an advanced outage control center (OCC) that is specifically designed to maximize the usefulness of communication and collaboration technologies for outage coordination and problem resolution activities. This report describes specific recent efforts to develop a capability called outage Micro-Scheduling. Micro-Scheduling is the ability to allocate and schedule outage support task resources on a sub-hour basis. Micro-Scheduling is the real-time fine-tuning of the outage schedule to react to the actual progress of the primary outage activities to ensure that support task resources are

  19. Aircraft Turbine Engine Control Research at NASA Glenn Research Center

    Science.gov (United States)

    Garg, Sanjay

    2014-01-01

    This lecture will provide an overview of the aircraft turbine engine control research at NASA (National Aeronautics and Space Administration) Glenn Research Center (GRC). A brief introduction to the engine control problem is first provided with a description of the current state-of-the-art control law structure. A historical aspect of engine control development since the 1940s is then provided with a special emphasis on the contributions of GRC. The traditional engine control problem has been to provide a means to safely transition the engine from one steady-state operating point to another based on the pilot throttle inputs. With the increased emphasis on aircraft safety, enhanced performance and affordability, and the need to reduce the environmental impact of aircraft, there are many new challenges being faced by the designers of aircraft propulsion systems. The Controls and Dynamics Branch (CDB) at GRC is leading and participating in various projects in partnership with other organizations within GRC and across NASA, other government agencies, the U.S. aerospace industry, and academia to develop advanced propulsion controls and diagnostics technologies that will help meet the challenging goals of NASA programs under the Aeronautics Research Mission. The second part of the lecture provides an overview of the various CDB technology development activities in aircraft engine control and diagnostics, both current and some accomplished in the recent past. The motivation for each of the research efforts, the research approach, technical challenges and the key progress to date are summarized. The technologies to be discussed include system level engine control concepts, gas path diagnostics, active component control, and distributed engine control architecture. The lecture will end with a futuristic perspective of how the various current technology developments will lead to an Intelligent and Autonomous Propulsion System requiring none to very minimum pilot interface

  20. Effort-reward imbalance and one-year change in neck-shoulder and upper extremity pain among call center computer operators.

    Science.gov (United States)

    Krause, Niklas; Burgel, Barbara; Rempel, David

    2010-01-01

    The literature on psychosocial job factors and musculoskeletal pain is inconclusive in part due to insufficient control for confounding by biomechanical factors. The aim of this study was to investigate prospectively the independent effects of effort-reward imbalance (ERI) at work on regional musculoskeletal pain of the neck and upper extremities of call center operators after controlling for (i) duration of computer use both at work and at home, (ii) ergonomic workstation design, (iii) physical activities during leisure time, and (iv) other individual worker characteristics. This was a one-year prospective study among 165 call center operators who participated in a randomized ergonomic intervention trial that has been described previously. Over an approximate four-week period, we measured ERI and 28 potential confounders via a questionnaire at baseline. Regional upper-body pain and computer use was measured by weekly surveys for up to 12 months following the implementation of ergonomic interventions. Regional pain change scores were calculated as the difference between average weekly pain scores pre- and post intervention. A significant relationship was found between high average ERI ratios and one-year increases in right upper-extremity pain after adjustment for pre-intervention regional mean pain score, current and past physical workload, ergonomic workstation design, and anthropometric, sociodemographic, and behavioral risk factors. No significant associations were found with change in neck-shoulder or left upper-extremity pain. This study suggests that ERI predicts regional upper-extremity pain in -computer operators working >or=20 hours per week. Control for physical workload and ergonomic workstation design was essential for identifying ERI as a risk factor.

  1. Control room human engineering influences on operator performance

    International Nuclear Information System (INIS)

    Finlayson, F.C.

    1977-01-01

    Three general groups of factors influence operator performance in fulfilling their responsibilities in the control room: (1) control room and control system design, informational data displays (operator inputs) as well as control board design (for operator output); (2) operator characteristics, including those skills, mental, physical, and emotional qualities which are functions of operator selection, training, and motivation; (3) job performance guides, the prescribed operating procedures for normal and emergency operations. This paper presents some of the major results of an evaluation of the effect of human engineering on operator performance in the control room. Primary attention is given to discussion of control room and control system design influence on the operator. Brief observations on the influences of operator characteristics and job performance guides (operating procedures) on performance in the control room are also given. Under the objectives of the study, special emphasis was placed on the evaluation of the control room-operator relationships for severe emergency conditions in the power plant. Consequently, this presentation is restricted largely to material related to emergency conditions in the control room, though it is recognized that human engineering of control systems is of equal (or greater) importance for many other aspects of plant operation

  2. Poison control center - Emergency number (image)

    Science.gov (United States)

    For a poison emergency call 1-800-222-1222 anywhere in the United States. This national hotline number will let you ... is a free and confidential service. All local poison control centers in the U.S. use this national ...

  3. The role of clinical toxicologists and poison control centers in public health.

    Science.gov (United States)

    Sutter, Mark E; Bronstein, Alvin C; Heard, Stuart E; Barthold, Claudia L; Lando, James; Lewis, Lauren S; Schier, Joshua G

    2010-06-01

    Poison control centers and clinical toxicologists serve many roles within public health; however, the degree to which these entities collaborate is unknown. The objective of this survey was to identify successful collaborations of public health agencies with clinical toxicologists and poison control centers. Four areas including outbreak identification, syndromic surveillance, terrorism preparedness, and daily public health responsibilities amenable to poison control center resources were assessed. An online survey was sent to the directors of poison control centers, state epidemiologists, and the most senior public health official in each state and selected major metropolitan areas. This survey focused on three areas: service, structure within the local or state public health system, and remuneration. Questions regarding remuneration and poison control center location within the public health structure were asked to assess if these were critical factors of successful collaborations. Senior state and local public health officials were excluded because of a low response rate. The survey was completed in October 2007. A total of 111 respondents, 61 poison control centers and 50 state epidemiologists, were eligible for the survey. Sixty-nine (62%) of the 111 respondents, completed and returned the survey. Thirty-three (54%) of the 61 poison control centers responded, and 36 of the 50 state epidemiologists (72%) responded. The most frequent collaborations were terrorism preparedness and epidemic illness reporting. Additional collaborations also exist. Important collaborations exist outside of remuneration or poison control centers being a formal part of the public health structure. Poison control centers have expanded their efforts to include outbreak identification, syndromic surveillance, terrorism preparedness, and daily public health responsibilities amenable to poison control center resources. Collaboration in these areas and others should be expanded. Published

  4. Middleware Evaluation and Benchmarking for Use in Mission Operations Centers

    Science.gov (United States)

    Antonucci, Rob; Waktola, Waka

    2005-01-01

    Middleware technologies have been promoted as timesaving, cost-cutting alternatives to the point-to-point communication used in traditional mission operations systems. However, missions have been slow to adopt the new technology. The lack of existing middleware-based missions has given rise to uncertainty about middleware's ability to perform in an operational setting. Most mission architects are also unfamiliar with the technology and do not know the benefits and detriments to architectural choices - or even what choices are available. We will present the findings of a study that evaluated several middleware options specifically for use in a mission operations system. We will address some common misconceptions regarding the applicability of middleware-based architectures, and we will identify the design decisions and tradeoffs that must be made when choosing a middleware solution. The Middleware Comparison and Benchmark Study was conducted at NASA Goddard Space Flight Center to comprehensively evaluate candidate middleware products, compare and contrast the performance of middleware solutions with the traditional point- to-point socket approach, and assess data delivery and reliability strategies. The study focused on requirements of the Global Precipitation Measurement (GPM) mission, validating the potential use of middleware in the GPM mission ground system. The study was jointly funded by GPM and the Goddard Mission Services Evolution Center (GMSEC), a virtual organization for providing mission enabling solutions and promoting the use of appropriate new technologies for mission support. The study was broken into two phases. To perform the generic middleware benchmarking and performance analysis, a network was created with data producers and consumers passing data between themselves. The benchmark monitored the delay, throughput, and reliability of the data as the characteristics were changed. Measurements were taken under a variety of topologies, data demands

  5. Control of TFTR during DT operations

    International Nuclear Information System (INIS)

    Pearson, G.G.; Alling, P.D.; Blanchard, W.; Camp, R.A.; Hawryluk, R.J.; Hosea, J.C.; Nagy, A.

    1995-01-01

    Since beginning routine D-T operations in December, 1993, there have been more than 500 DT plasmas and approximately 600,000 Ci of tritium processed through TFTR culminating in greater than 10 MW of fusion power produced in a single discharge in November, 1994. These performance levels were achieved while maintaining the highest levels of personnel and equipment safety. Prior to D-T operations, a Chain of Command structure and a TFTR Shift Supervisor (TFTRSS) position were developed for centralized control of the facility with all subsystems reporting to this position. A comprehensive surveillance system was incorporated such that the TFTR SS could easily review the operational readiness of subsystems for D-T operations. A TFTR SS Station was constructed to facilitate monitoring and control of TFTR. This station includes a camera system, FAX, a networked personal computer, a computerized tritium monitor and control system and a hardware interlock system. In the transition from D-D to D-T operations, TFTR's procedures were reviewed/revised and a number of additional procedures developed for control of activities at the facility. This paper details the equipment, administrative and organizational configurations used for controlling TFTR during D-T operations

  6. 33 CFR 334.1170 - San Pablo Bay, Calif.; gunnery range, Naval Inshore Operations Training Center, Mare Island...

    Science.gov (United States)

    2010-07-01

    ... range, Naval Inshore Operations Training Center, Mare Island, Vallejo. 334.1170 Section 334.1170... Operations Training Center, Mare Island, Vallejo. (a) The Danger Zone. A sector in San Pablo Bay delineated..., Vallejo, California, will conduct gunnery practice in the area during the period April 1 through September...

  7. Improvement of quality with Nuclear Power Training Center (NTC) operator training

    International Nuclear Information System (INIS)

    Matsumoto, Y.

    2005-01-01

    Nuclear Power Training Center (NTC) was established in 1972 for PWR operator training. As the result of introduction of quality assurance management into NTC operator training, it became possible to confirm each step of systematic approach to training (SAT) process and then feedback process became clearer. Simulation models were modified based on domestic or overseas accidents cases and so training was improved using simulators closer to actual plants. Also a new multipurpose simulator with modified reactor coolant system (RCS) visual display device (RVD) and parameter-event-log (PEL) device was introduced in 2003 to provide more information so as to upgrade knowledge level of operators. (T. Tanaka)

  8. The Effectiveness of Yoga on Spiritual Intelligence in Air Traffic Controllers of Tehran Flight Control Center

    Science.gov (United States)

    Safara, Maryam; Ghasemi, Pejman

    2017-01-01

    The aim of this study was to evaluate the efficacy of yoga on spiritual intelligence in air traffic controllers in Tehran flight control center. This was a quasi-experimental research and the study population includes all air traffic controllers in Tehran flight control center. The sample consisted of 40 people of the study population that were…

  9. The ORNL Controlled Fusion Atomic Data Center

    International Nuclear Information System (INIS)

    Schultz, D.R.; Krstic, P.S.; Ownby, F.M.; Meyer, F.W.; Havener, C.C.; Bannister, M.E.; Liu, W.; Jeffery, D.J.; Stancil, P.C.

    1997-01-01

    The principal mission of the Controlled Fusion Atomic Data Center is the collection evaluation, and dissemination of atomic collision data relevant to fusion energy development. With the advent of the widespread use of the World Wide Web, the data center's resources are being placed on-line to facilitate their use by end-users (cf. http://www-cfadc.phy.ornl.gov/). As this development continues, initially disparate, individually compiled resources will be transformed into integrated tools for retrieving recommended data, or displaying and manipulating the information available. The data center's present capabilities, recent data production/evaluation efforts, and goals for future development are highlighted here

  10. Learning System Center App Controller

    CERN Document Server

    Naeem, Nasir

    2015-01-01

    This book is intended for IT professionals working with Hyper-V, Azure cloud, VMM, and private cloud technologies who are looking for a quick way to get up and running with System Center 2012 R2 App Controller. To get the most out of this book, you should be familiar with Microsoft Hyper-V technology. Knowledge of Virtual Machine Manager is helpful but not mandatory.

  11. FFTF Work Control Center

    International Nuclear Information System (INIS)

    Talbot, M.D.

    1986-01-01

    A centralized Work Control Center (WCC) is responsible for assuring that maintenance and modification of the Fast Flux Test Facility (FFTF) is performed in accordance with written procedures that ensure design integrity, personnel and public safety, and equipment and system availability for the computerized Master Information Data Acquisition System (MIDAS). Each maintenance task is logged into MIDAS from a Work Request from that has been reviewed and prioritized by the WCC. Thereafter, MIDAS is used to track schedule, manpower and material requirements; authorize field work; and close out the maintenance activity

  12. Adaptation of Control Center Software to Commerical Real-Time Display Applications

    Science.gov (United States)

    Collier, Mark D.

    1994-01-01

    NASA-Marshall Space Flight Center (MSFC) is currently developing an enhanced Huntsville Operation Support Center (HOSC) system designed to support multiple spacecraft missions. The Enhanced HOSC is based upon a distributed computing architecture using graphic workstation hardware and industry standard software including POSIX, X Windows, Motif, TCP/IP, and ANSI C. Southwest Research Institute (SwRI) is currently developing a prototype of the Display Services application for this system. Display Services provides the capability to generate and operate real-time data-driven graphic displays. This prototype is a highly functional application designed to allow system end users to easily generate complex data-driven displays. The prototype is easy to use, flexible, highly functional, and portable. Although this prototype is being developed for NASA-MSFC, the general-purpose real-time display capability can be reused in similar mission and process control environments. This includes any environment depending heavily upon real-time data acquisition and display. Reuse of the prototype will be a straight-forward transition because the prototype is portable, is designed to add new display types easily, has a user interface which is separated from the application code, and is very independent of the specifics of NASA-MSFC's system. Reuse of this prototype in other environments is a excellent alternative to creation of a new custom application, or for environments with a large number of users, to purchasing a COTS package.

  13. McClellan Nuclear Radiation Center (MNRC) TRIGA reactor: Four years of operations

    International Nuclear Information System (INIS)

    Heidel, C.C.; Richards, W.J.

    1994-01-01

    McClellan Air Force Base, at Sacramento, California, is headquarters for the Sacramento Air Force Logistics Center (SM-ALC). McClellan Air Force Base provides extensive inspection and maintenance capabilities for the F-111, F-1 5, and other military aircraft. Criticality of the MNRC TRIGA reactor was obtained on January 20, 1990 with 63 standard TRIGA fuel elements, three fuel-followed control rods and one air-followed control rod. Presently there are 93 fuel elements in the reactor core. The reactor can be operated at 1 MW steady state power, producing pulses up to three dollars worth of reactivity addition, and can be square waved up to 1 MW. The reactor core contains a circular grid plate and a graphite reflector assembly surrounding the core. Four tangential beam ports installed in the reflector assembly provide a thermal neutron flux to four radiography bays. The reactor tank is twenty-four (24) feet deep, seven and one-half (7.5) feet in diameter, and has a protrusion in the upper portion of the reactor tank. This protrusion is scheduled for use as a neutron thermal collimator in the future. Besides the neutron radiography capabilities, the reactor contains a pneumatic rabbit system, a central thimble, an in-core irradiation facility, and three additional cutouts that provide locations for additional irradiation facilities. The central thimble can be removed along with the B-ring locations of the upper portion of the grid plate to provide an additional and larger in-core irradiation facility. A new upper grid plate has been manufactured to expand one triangular cutout so that larger experiments can be inserted directly into the reactor core. Some operational problems experienced during the first four years of operations are the timeout of the CSC and DAC watchdogs, deterioration of the heat exchanger gaskets, and loss of thermocouples in the instrumented fuel elements. (author)

  14. Method for automatic control rod operation using rule-based control

    International Nuclear Information System (INIS)

    Kinoshita, Mitsuo; Yamada, Naoyuki; Kiguchi, Takashi

    1988-01-01

    An automatic control rod operation method using rule-based control is proposed. Its features are as follows: (1) a production system to recognize plant events, determine control actions and realize fast inference (fast selection of a suitable production rule), (2) use of the fuzzy control technique to determine quantitative control variables. The method's performance was evaluated by simulation tests on automatic control rod operation at a BWR plant start-up. The results were as follows; (1) The performance which is related to stabilization of controlled variables and time required for reactor start-up, was superior to that of other methods such as PID control and program control methods, (2) the process time to select and interpret the suitable production rule, which was the same as required for event recognition or determination of control action, was short (below 1 s) enough for real time control. The results showed that the method is effective for automatic control rod operation. (author)

  15. The Emergence of Organizational Fit: Applying Configuration Theory to the Snohomish County (WA) Emergency Operations Center

    Science.gov (United States)

    2016-03-01

    Oaks, CA: Sage, 2001), 2. 30 Donaldson, “The Contingency Theory of Organizational Design,” 22. 18 theory emphasizes the necessity of fit,31 but it...ORGANIZATIONAL FIT: APPLYING CONFIGURATION THEORY TO THE SNOHOMISH COUNTY (WA) EMERGENCY OPERATIONS CENTER by Jason M. Biermann March 2016...CONFIGURATION THEORY TO THE SNOHOMISH COUNTY (WA) EMERGENCY OPERATIONS CENTER 5. FUNDING NUMBERS 6. AUTHOR(S) Jason M. Biermann 7. PERFORMING

  16. Fog-Assisted Operational Cost Reduction for Cloud Data Centers

    OpenAIRE

    Yu, Liang; Jiang, Tao; Zou, Yulong

    2017-01-01

    In this paper, we intend to reduce the operational cost of cloud data centers with the help of fog devices, which can avoid the revenue loss due to wide-area network propagation delay and save network bandwidth cost by serving nearby cloud users. Since fog devices may not be owned by a cloud service provider, they should be compensated for serving the requests of cloud users. When taking economical compensation into consideration, the optimal number of requests processed locally by each fog d...

  17. Electric Power Research Institute Environmental Control Technology Center Report to the Steering Committee

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    1998-01-12

    Operations and maintenance continued this month at the Electric Power Research Institute's (EPRI's) Environmental Control Technology Center (ECTC). Testing for the month involved the Dry Sorbent Injection (DSI) test block with the Carbon Injection System. The 1.0 MW Cold-Side Selective Catalytic Reduction (SCR) unit, the 0.4 MW Mini-Pilot Wet Scrubber, and the 4.0 MW Pilot Wet Scrubber remained idle this month in a cold-standby mode and were inspected regularly. These units remain available for testing as future project work is identified.

  18. Intelligent systems approach for automated identification of individual control behavior of a human operator

    Science.gov (United States)

    Zaychik, Kirill B.

    Acceptable results have been obtained using conventional techniques to model the generic human operator's control behavior. However, little research has been done in an attempt to identify an individual based on his/her control behavior. The main hypothesis investigated in this dissertation is that different operators exhibit different control behavior when performing a given control task. Furthermore, inter-person differences are manifested in the amplitude and frequency content of the non-linear component of the control behavior. Two enhancements to the existing models of the human operator, which allow personalization of the modeled control behavior, are presented in this dissertation. One of the proposed enhancements accounts for the "testing" control signals, which are introduced by an operator for more accurate control of the system and/or to adjust his/her control strategy. Such enhancement uses the Artificial Neural Network (ANN), which can be fine-tuned to model the "testing" control behavior of a given individual. The other model enhancement took the form of an equiripple filter (EF), which conditions the power spectrum of the control signal before it is passed through the plant dynamics block. The filter design technique uses Parks-McClellan algorithm, which allows parameterization of the desired levels of power at certain frequencies. A novel automated parameter identification technique (APID) was developed to facilitate the identification process of the parameters of the selected models of the human operator. APID utilizes a Genetic Algorithm (GA) based optimization engine called the Bit-climbing Algorithm (BCA). Proposed model enhancements were validated using the experimental data obtained at three different sources: the Manual Control Laboratory software experiments, Unmanned Aerial Vehicle simulation, and NASA Langley Research Center Visual Motion Simulator studies. Validation analysis involves comparison of the actual and simulated control

  19. Xingo`s control center; Centro de controle de Xingo

    Energy Technology Data Exchange (ETDEWEB)

    Parente, Benedito; Souza, Antonio; Ferraz, Adelson; Florentino, Luiz; Costa, Carlos [Companhia Hidroeletrica do Sao Francisco (CHESF), Recife, PE (Brazil)

    1995-12-31

    This work describes the development activities of the Xingo`s Control Center, since its production until its commissioning. It emphasizes the applicative programs developed by the CHESF`s, an electric power utility of Brazil (Northeast and Southeast of Brazil, team together with the furnisher`s team. The results of factory and field tests are commented 7 refs.

  20. INTEGRATED ROBOT-HUMAN CONTROL IN MINING OPERATIONS

    Energy Technology Data Exchange (ETDEWEB)

    George Danko

    2005-04-01

    This report contains a detailed description of the work conducted in the first year of the project on Integrated Robot-Human Control in Mining Operations at University of Nevada, Reno. This project combines human operator control with robotic control concepts to create a hybrid control architecture, in which the strengths of each control method are combined to increase machine efficiency and reduce operator fatigue. The kinematics reconfiguration type differential control of the excavator implemented with a variety of ''software machine kinematics'' is the key feature of the project. This software re-configured excavator is more desirable to execute a given digging task. The human operator retains the master control of the main motion parameters, while the computer coordinates the repetitive movement patterns of the machine links. These repetitive movements may be selected from a pre-defined family of trajectories with different transformations. The operator can make adjustments to this pattern in real time, as needed, to accommodate rapidly-changing environmental conditions. A Bobcat{reg_sign} 435 excavator was retrofitted with electro-hydraulic control valve elements. The modular electronic control was tested and the basic valve characteristics were measured for each valve at the Robotics Laboratory at UNR. Position sensors were added to the individual joint control actuators, and the sensors were calibrated. An electronic central control system consisting of a portable computer, converters and electronic driver components was interfaced to the electro-hydraulic valves and position sensors. The machine is operational with or without the computer control system depending on whether the computer interface is on or off. In preparation for emulated mining tasks tests, typical, repetitive tool trajectories during surface mining operations were recorded at the Newmont Mining Corporation's ''Lone Tree'' mine in Nevada.

  1. 75 FR 30409 - Centers for Disease Control and Prevention

    Science.gov (United States)

    2010-06-01

    ... applications received in response to ``Workplace Health Research Network (WHRN)--Coordinating Center, SIP 10-031 and WHRN--Collaborating Centers, SIP 10-032, initial review.'' Contact Person for More Information..., Disability, and Injury Prevention and Control Special Interest Projects (SIPs): Workplace Health Research...

  2. Hydrate Control for Gas Storage Operations

    Energy Technology Data Exchange (ETDEWEB)

    Jeffrey Savidge

    2008-10-31

    The overall objective of this project was to identify low cost hydrate control options to help mitigate and solve hydrate problems that occur in moderate and high pressure natural gas storage field operations. The study includes data on a number of flow configurations, fluids and control options that are common in natural gas storage field flow lines. The final phase of this work brings together data and experience from the hydrate flow test facility and multiple field and operator sources. It includes a compilation of basic information on operating conditions as well as candidate field separation options. Lastly the work is integrated with the work with the initial work to provide a comprehensive view of gas storage field hydrate control for field operations and storage field personnel.

  3. Protocol of a randomized controlled trial of the Tobacco Tactics website for operating engineers

    Directory of Open Access Journals (Sweden)

    Duffy Sonia A

    2012-05-01

    Full Text Available Abstract Background Recent research indicates that 35 percent of blue-collar workers in the US currently smoke while only 20 percent of white-collar workers smoke. Over the last year, we have been working with heavy equipment operators, specifically the Local 324 Training Center of the International Union of Operating Engineers, to study the epidemiology of smoking, which is 29% compared to 21% among the general population. For the current study funded by the National Cancer Institute (1R21CA152247-01A1, we have developed the Tobacco Tactics website which will be compared to the state supported 1-800-QUIT-NOW telephone line. Outcome evaluation will compare those randomized to the Tobacco Tactics web-based intervention to those randomized to the 1-800-QUIT-NOW control condition on: a 30-day and 6-month quit rates; b cotinine levels; c cigarettes smoked/day; d number of quit attempts; and e nicotine addiction. Process evaluation will compare the two groups on the: a contacts with intervention; b medications used; c helpfulness of the nurse/coach; and d willingness to recommend the intervention to others. Methods/Design This will be a randomized controlled trial (N = 184. Both interventions will be offered during regularly scheduled safety training at Local 324 Training Center of the International Union of Operating Engineers and both will include optional provision of over-the-counter nicotine replacement therapy and the same number of telephone contacts. However, the Tobacco Tactics website has graphics tailored to Operating Engineers, tailored cessation feedback from the website, and follow up nurse counseling offered by multimedia options including phone and/or email, and/or e-community. Primary Analysis of Aim 1 will be conducted by using logistic regression to compare smoking habits (e.g., quit rates of those in the intervention arm to those in the control arm. Primary analyses for Aim 2 will compare process measures (e.g., medications

  4. Training Center for Industrial Control Systems

    Directory of Open Access Journals (Sweden)

    V. D. Yezhov

    2013-01-01

    Full Text Available We consider the application of embedded microcontrollers and industrial controllers with built-in operating systems.With the development of embedded operating systems and technology of open standard IEC 61131-3 product developer can write their own program management and support staff – to modernize management program.

  5. The Next Generation of Ground Operations Command and Control; Scripting in C Sharp and Visual Basic

    Science.gov (United States)

    Ritter, George; Pedoto, Ramon

    2010-01-01

    This slide presentation reviews the use of scripting languages in Ground Operations Command and Control. It describes the use of scripting languages in a historical context, the advantages and disadvantages of scripts. It describes the Enhanced and Redesigned Scripting (ERS) language, that was designed to combine the features of a scripting language and the graphical and IDE richness of a programming language with the utility of scripting languages. ERS uses the Microsoft Visual Studio programming environment and offers custom controls that enable an ERS developer to extend the Visual Basic and C sharp language interface with the Payload Operations Integration Center (POIC) telemetry and command system.

  6. Feedback control of a primary pump for safe and stable operation of a PIUS-type reactor

    International Nuclear Information System (INIS)

    Tasaka, K.; Imai, S.; Masaoka, H.; Tamaki, M.; Kukita, Y.

    1993-01-01

    A new automatic pump speed control system by using a measurement of the temperature distribution in the lower density lock is proposed for the PIUS-type reactor. This control system maintains the fluid temperature at the axial center of the lower density lock at the average of the fluid temperatures below and above the density lock in order to prevent the poison water from penetrating into the core during normal operation. The effectiveness of this control system was successfully confirmed by a series of experiments such as start-up and power ramping tests for the stable normal operation and a loss-of-feedwater test for the safe shutdown in an accident condition, using a small scale atmospheric pressure test loop which simulated the PIUS principle. (orig.)

  7. Improving emergency management through shared information processing - considerations in Emergency Operations Center design

    International Nuclear Information System (INIS)

    DeBusk, R.E.; Walker, J.A.

    1987-01-01

    An Emergency Operations Center (EOC) is a shared information processing facility. Although seemingly obvious, many EOCs are designed and operated based on other criteria. The results, measured in terms of response effectiveness, are difficult to determine. A review of some recent disasters reveals a pattern of poor performance for the EOCs involved. These conclusions are tentative because so little research has been done on the design, operation, or evaluation of emergency operations centers. The EOC is not an onsite response command post but a facility removed from the response where tactical and strategic decisions are made based on information from the response site and elsewhere. The EOC is therefore the central focus of emergency information processing and higher-level decision making. Examining existing EOCs, several common functions emerge. These functions can be described in terms of shared information processing. However, many factors impact the design and operation of EOCs. Politics, budgets, and personal ambition are only a few such factors. Examining EOC design and operation in terms of shared information processing operationalized in the seven principal functions within the EOC provides a framework for establishing principles of EOC design and operation. In the response to emergencies such as Bhopal or Chernobyl the stakes are high. Applying new techniques and technologies of management systems can improve the probability of success. This research is a beginning step - to understand how EOCs function, to define the system. Predictive or prescriptive analysis must wait until sufficient empirical data is available to complete a descriptive model for EOC operations

  8. 21 CFR 111.127 - What quality control operations are required for packaging and labeling operations?

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 2 2010-04-01 2010-04-01 false What quality control operations are required for... and Process Control System: Requirements for Quality Control § 111.127 What quality control operations are required for packaging and labeling operations? Quality control operations for packaging and...

  9. Operational Strategy of CBPs for load balancing of Operators in Advanced Main Control Room

    International Nuclear Information System (INIS)

    Kim, Seunghwan; Kim, Yochan; Jung, Wondea

    2014-01-01

    With the using of a computer-based control room in an APR1400 (Advanced Pressurized Reactor-1400), the operators' behaviors in the main control room had changed. However, though the working environment of operators has been changed a great deal, digitalized interfaces can also change the cognitive tasks or activities of operators. First, a shift supervisor (SS) can confirm/check the conduction of the procedures and the execution of actions of board operators (BOs) while confirming directly the operation variables without relying on the BOs. Second, all operators added to their work the use of a new CBP and Soft Controls, increasing their procedural workload. New operational control strategies of CBPs are necessary for load balancing of operator's task load in APR1400. In this paper, we compared the workloads of operators in an APR1400 who work with two different usages of the CBP. They are SS oriented usage and SS-BO collaborative usage. In this research, we evaluated the workloads of operators in an advanced main control room by the COCOA method. Two types of CBP usages were defined and the effects of these usages on the workloads were investigated. The obtained results showed that the workloads between operators in a control room can be balanced according to the CBP usages by assigning control authority to the operators

  10. Operational Strategy of CBPs for load balancing of Operators in Advanced Main Control Room

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Seunghwan; Kim, Yochan; Jung, Wondea [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2014-05-15

    With the using of a computer-based control room in an APR1400 (Advanced Pressurized Reactor-1400), the operators' behaviors in the main control room had changed. However, though the working environment of operators has been changed a great deal, digitalized interfaces can also change the cognitive tasks or activities of operators. First, a shift supervisor (SS) can confirm/check the conduction of the procedures and the execution of actions of board operators (BOs) while confirming directly the operation variables without relying on the BOs. Second, all operators added to their work the use of a new CBP and Soft Controls, increasing their procedural workload. New operational control strategies of CBPs are necessary for load balancing of operator's task load in APR1400. In this paper, we compared the workloads of operators in an APR1400 who work with two different usages of the CBP. They are SS oriented usage and SS-BO collaborative usage. In this research, we evaluated the workloads of operators in an advanced main control room by the COCOA method. Two types of CBP usages were defined and the effects of these usages on the workloads were investigated. The obtained results showed that the workloads between operators in a control room can be balanced according to the CBP usages by assigning control authority to the operators.

  11. Operational status of the Los Alamos neutron science center (LANSCE)

    Energy Technology Data Exchange (ETDEWEB)

    Jones, Kevin W [Los Alamos National Laboratory; Erickson, John L [Los Alamos National Laboratory; Schoenberg, Kurt F [Los Alamos National Laboratory

    2010-01-01

    The Los Alamos Neutron Science Center (LANSCE) accelerator and beam delivery complex generates the proton beams that serve three neutron production sources; the thermal and cold source for the Manuel Lujan Jr. Neutron Scattering Center, the Weapons Neutron Research (WNR) high-energy neutron source, and a pulsed Ultra-Cold Neutron Source. These three sources are the foundation of strong and productive multi-disciplinary research programs that serve a diverse and robust user community. The facility also provides multiplexed beams for the production of medical radioisotopes and proton radiography of dynamic events. The recent operating history of these sources will be reviewed and plans for performance improvement will be discussed, together with the underlying drivers for the proposed LANSCE Refurbishment project. The details of this latter project are presented in a separate contribution.

  12. Operation of emergency operating centers during mass casualty incidents in taiwan: a disaster management perspective.

    Science.gov (United States)

    Wen, Jet-Chau; Tsai, Chia-Chou; Chen, Mei-Hsuan; Chang, Wei-Ta

    2014-10-01

    On April 27, 2011, a train derailed and crashed in Taiwan, causing a mass casualty incident (MCI) that was similar to a previous event and with similar consequences. In both disasters, the emergency operating centers (EOCs) could not effectively integrate associated agencies to deal with the incident. The coordination and utilization of resources were inefficient, which caused difficulty in command structure operation and casualty evacuation. This study was designed to create a survey questionnaire with problem items using disaster management phases mandated by Taiwan's Emergency Medical Care Law (EMCL), use statistical methods (t test) to analyze the results and issues the EOCs encountered during the operation, and propose solutions for those problems. Findings showed that EOCs lacked authority to intervene or coordinate with associated agencies. Also, placing emphasis on the recovery phase should improve future prevention and response mechanisms. To improve the response to MCIs, the EMCL needs to be amended to give EOCs the lead during disasters; use feedback from the recovery phase to improve future disaster management and operation coordination; and establish an information-sharing platform across agencies to address all aspects of relief work.(Disaster Med Public Health Preparedness. 2014;0:1-6).

  13. Short-Term Prediction Research and Transition (SPoRT) Center: Transitioning Satellite Data to Operations

    Science.gov (United States)

    Zavodsky, Bradley

    2012-01-01

    The Short-term Prediction Research and Transition (SPoRT) Center located at NASA Marshall Space Flight Center has been conducting testbed activities aimed at transitioning satellite products to National Weather Service operational end users for the last 10 years. SPoRT is a NASA/NOAA funded project that has set the bar for transition of products to operational end users through a paradigm of understanding forecast challenges and forecaster needs, displaying products in end users decision support systems, actively assessing the operational impact of these products, and improving products based on forecaster feedback. Aiming for quality partnerships rather than a large quantity of data users, SPoRT has become a community leader in training operational forecasters on the use of up-and-coming satellite data through the use of legacy instruments and proxy data. Traditionally, SPoRT has supplied satellite imagery and products from NASA instruments such as the Moderate-resolution Imaging Spectroradiometer (MODIS) and the Atmospheric Infrared Sounder (AIRS). However, recently, SPoRT has been funded by the GOES-R and Joint Polar Satellite System (JPSS) Proving Grounds to accelerate the transition of selected imagery and products to help improve forecaster awareness of upcoming operational data from the Visible Infrared Imager Radiometer Suite (VIIRS), Cross-track Infrared Sounder (CrIS), Advanced Baseline Imager (ABI), and Geostationary Lightning Mapper (GLM). This presentation provides background on the SPoRT Center, the SPoRT paradigm, and some example products that SPoRT is excited to work with forecasters to evaluate.

  14. Techniques for evaluating optimum data center operation

    Science.gov (United States)

    Hamann, Hendrik F.; Rodriguez, Sergio Adolfo Bermudez; Wehle, Hans-Dieter

    2017-06-14

    Techniques for modeling a data center are provided. In one aspect, a method for determining data center efficiency is provided. The method includes the following steps. Target parameters for the data center are obtained. Technology pre-requisite parameters for the data center are obtained. An optimum data center efficiency is determined given the target parameters for the data center and the technology pre-requisite parameters for the data center.

  15. A summary of waste disposal operator and office abolition of the Radioisotope Center in the University of Tokyo

    International Nuclear Information System (INIS)

    Higaki, Shogo; Kosaka, Naoki; Nogawa, Norio

    2014-01-01

    Radioisotope center in the University of Tokyo had approval of waste disposal operator only in the universities of Japan since 1983. However, the radioisotope center abolished the waste disposal office in December 2013. In this paper, we summarize the history of the waste disposal operator in the radioisotope center, and report the procedure of office abolition under the Japanese law and regulations concerning prevention from radiation hazards due to radio-isotopes, etc. revised after April 2012. (author)

  16. Contents operation center for 'mopera' information service; Mopera joho service muke contents un'ei center

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    'Mopera' information service is a mobile information service in which NTT Mobile Communications Network, Inc. offers information of various fields such as business and hobbies for the users of the portable telephone or PHS of the company. Toshiba Corp. started the contents operation center consistently performing from the preparation of contents to the management of a server for the above information service, making efforts in expanding the contents since the beginning of the service in the fall of 1998, and operating at present more than ten kinds of contents such as news, weather forecast, and stock information other than mobile 'Ekimae-Tanken Club' (adventure club in front of a station). Moreover, Toshiba takes it into consideration to build a system aiming at a stable operation like a duplex operation of a server, 24-hour automatic surveillance, etc., continuously providing highly reliable services. (translated by NEDO)

  17. Engineering Process Monitoring for Control Room Operation

    CERN Document Server

    Bätz, M

    2001-01-01

    A major challenge in process operation is to reduce costs and increase system efficiency whereas the complexity of automated process engineering, control and monitoring systems increases continuously. To cope with this challenge the design, implementation and operation of process monitoring systems for control room operation have to be treated as an ensemble. This is only possible if the engineering of the monitoring information is focused on the production objective and is lead in close collaboration of control room teams, exploitation personnel and process specialists. In this paper some principles for the engineering of monitoring information for control room operation are developed at the example of the exploitation of a particle accelerator at the European Laboratory for Nuclear Research (CERN).

  18. Computer control of shielded cell operations

    International Nuclear Information System (INIS)

    Jeffords, W.R. III.

    1987-01-01

    This paper describes in detail a computer system to remotely control shielded cell operations. System hardware, software, and design criteria are discussed. We have designed a computer-controlled buret that provides a tenfold improvement over the buret currently in service. A computer also automatically controls cell analyses, calibrations, and maintenance. This system improves conditions for the operators by providing a safer, more efficient working environment and is expandable for future growth and development

  19. Lithium control during normal operation

    International Nuclear Information System (INIS)

    Suryanarayan, S.; Jain, D.

    2010-01-01

    Periodic increases in lithium (Li) concentrations in the primary heat transport (PHT) system during normal operation are a generic problem at CANDU® stations. Lithiated mixed bed ion exchange resins are used at stations for pH control in the PHT system. Typically tight chemistry controls including Li concentrations are maintained in the PHT water. The reason for the Li increases during normal operation at CANDU stations such as Pickering was not fully understood. In order to address this issue a two pronged approach was employed. Firstly, PNGS-A data and information from other available sources was reviewed in an effort to identify possible factors that may contribute to the observed Li variations. Secondly, experimental studies were carried out to assess the importance of these factors in order to establish reasons for Li increases during normal operation. Based on the results of these studies, plausible mechanisms/reasons for Li increases have been identified and recommendations made for proactive control of Li concentrations in the PHT system. (author)

  20. Computer-aided dispatch--traffic management center field operational test : Washington State final report

    Science.gov (United States)

    2006-05-01

    This document provides the final report for the evaluation of the USDOT-sponsored Computer-Aided Dispatch - Traffic Management Center Integration Field Operations Test in the State of Washington. The document discusses evaluation findings in the foll...

  1. Elements of an advanced integrated operator control station

    International Nuclear Information System (INIS)

    Clarke, M.M.; Kreifeldt, J.G.

    1984-01-01

    One of the critical determinants of peformance for any remotely operated maintenance system is the compatibility achieved between elements of the man/machine interface (e.g., master manipulator controller, controls, displays, etc.) and the human operator. In the Remote Control Engineering task of the Consolidated Fuel Reprocessing Program, considerable attention has been devoted to optimizing the man/machine interface of the operator control station. This system must be considered an integral element of the overall maintenance work system which includes transporters, manipulators, remote viewing, and other parts. The control station must reflect the integration of the operator team, control/display panels, manipulator master controllers, and remote viewing monitors. Human factors principles and experimentation have been used in the development of an advanced integrated operator control station designed for the advance servomanipulator. Key features of this next-generation design are summarized in this presentation. 7 references, 4 figures

  2. Elements of an advanced integrated operator control station

    International Nuclear Information System (INIS)

    Clarke, M.M.; Kreifeldt, J.G.

    1984-01-01

    One of the critical determinants of performance for any remotely operated maintenance system is the compatibility achieved between elements of the man/machine interface (e.g., master manipulator controller, controls, displays) and the human operator. In the remote control engineering task of the Consolidated Fuel Reprocessing Program, considerable attention has been devoted to optimizing the man/machine interface of the operator control station. This system must be considered an integral element of the overall maintenance work system which includes transporters, manipulators, remote viewing, and other parts. The control station must reflect the integration of the operator team, control/display panels, manipulator master controllers, and remote viewing monitors. Human factors principles and experimentation have been used in the development of an advanced integrated operator control station designed for the advance servomanipulator. Key features of this next-generation design are summarized in this presentation. 7 references, 4 figures

  3. Advanced control room caters for the operator

    International Nuclear Information System (INIS)

    George, C.R.; Rygg, D.E.

    1980-01-01

    In existing control rooms the operators' efficiency is often limited by widely scattered and sometimes illogically arranged controls which tend to increase the potential for outages or equipment damage. The advanced control room described allows instant and ready access to preselected information and control by one or two operators from a seated or standing position. (author)

  4. A Multiple Agent Model of Human Performance in Automated Air Traffic Control and Flight Management Operations

    Science.gov (United States)

    Corker, Kevin; Pisanich, Gregory; Condon, Gregory W. (Technical Monitor)

    1995-01-01

    A predictive model of human operator performance (flight crew and air traffic control (ATC)) has been developed and applied in order to evaluate the impact of automation developments in flight management and air traffic control. The model is used to predict the performance of a two person flight crew and the ATC operators generating and responding to clearances aided by the Center TRACON Automation System (CTAS). The purpose of the modeling is to support evaluation and design of automated aids for flight management and airspace management and to predict required changes in procedure both air and ground in response to advancing automation in both domains. Additional information is contained in the original extended abstract.

  5. Aging Management Guideline for commercial nuclear power plants: Motor control centers

    International Nuclear Information System (INIS)

    Toman, G.; Gazdzinski, R.; O'Hearn, E.

    1994-02-01

    This Aging Management Guideline (AMG) provides recommended methods for effective detection and mitigation of age-related degradation mechanisms in Boiling Water Reactor (BWR) and Pressurized Water Reactor (PWR) commercial nuclear power plant motor control centers important to license renewal. The intent of this AMG is to assist plant maintenance and operations personnel in maximizing the safe, useful life of these components. It also supports the documentation of effective aging management programs required under the License Renewal Rule 10 CFR Part 54. This AMG is presented in a manner that allows personnel responsible for performance analysis and maintenance to compare their plant-specific aging mechanisms (expected or already experienced) and aging management program activities to the more generic results and recommendations presented herein

  6. Space Operations Center system analysis. Volume 3, book 2: SOC system definition report, revision A

    Science.gov (United States)

    1982-01-01

    The Space Operations Center (SOC) orbital space station program operations are described. A work breakdown structure for the general purpose support equipment, construction and transportation support, and resupply and logistics support systems is given. The basis for the design of each element is presented, and a mass estimate for each element supplied. The SOC build-up operation, construction, flight support, and satellite servicing operations are described. Detailed programmatics and cost analysis are presented.

  7. Sustainable Model for Public Health Emergency Operations Centers for Global Settings.

    Science.gov (United States)

    Balajee, S Arunmozhi; Pasi, Omer G; Etoundi, Alain Georges M; Rzeszotarski, Peter; Do, Trang T; Hennessee, Ian; Merali, Sharifa; Alroy, Karen A; Phu, Tran Dac; Mounts, Anthony W

    2017-10-01

    Capacity to receive, verify, analyze, assess, and investigate public health events is essential for epidemic intelligence. Public health Emergency Operations Centers (PHEOCs) can be epidemic intelligence hubs by 1) having the capacity to receive, analyze, and visualize multiple data streams, including surveillance and 2) maintaining a trained workforce that can analyze and interpret data from real-time emerging events. Such PHEOCs could be physically located within a ministry of health epidemiology, surveillance, or equivalent department rather than exist as a stand-alone space and serve as operational hubs during nonoutbreak times but in emergencies can scale up according to the traditional Incident Command System structure.

  8. Operation Aspect of the Main Control Room of NPP

    International Nuclear Information System (INIS)

    Sahala M Lumbanraja

    2009-01-01

    The main control room of Nuclear Power Plant (NPP) is operational centre to control all of the operation activity of NPP. NPP must be operated carefully and safely. Many aspect that contributed to operation of NPP, such as man power whose operated, technology type used, ergonomic of main control room, operational management, etc. The disturbances of communication in control room must be anticipated so the high availability of NPP can be achieved. The ergonomic of the NPP control room that will be used in Indonesia must be designed suitable to anthropometric of Indonesia society. (author)

  9. Status of the TESS Science Processing Operations Center

    Science.gov (United States)

    Jenkins, Jon M.; Twicken, Joseph D.; Campbell, Jennifer; Tenebaum, Peter; Sanderfer, Dwight; Davies, Misty D.; Smith, Jeffrey C.; Morris, Rob; Mansouri-Samani, Masoud; Girouardi, Forrest; hide

    2017-01-01

    The Transiting Exoplanet Survey Satellite (TESS) science pipeline is being developed by the Science Processing Operations Center (SPOC) at NASA Ames Research Center based on the highly successful Kepler Mission science pipeline. Like the Kepler pipeline, the TESS science pipeline will provide calibrated pixels, simple and systematic error-corrected aperture photometry, and centroid locations for all 200,000+ target stars, observed over the 2-year mission, along with associated uncertainties. The pixel and light curve products are modeled on the Kepler archive products and will be archived to the Mikulski Archive for Space Telescopes (MAST). In addition to the nominal science data, the 30-minute Full Frame Images (FFIs) simultaneously collected by TESS will also be calibrated by the SPOC and archived at MAST. The TESS pipeline will search through all light curves for evidence of transits that occur when a planet crosses the disk of its host star. The Data Validation pipeline will generate a suite of diagnostic metrics for each transit-like signature discovered, and extract planetary parameters by fitting a limb-darkened transit model to each potential planetary signature. The results of the transit search will be modeled on the Kepler transit search products (tabulated numerical results, time series products, and pdf reports) all of which will be archived to MAST.

  10. Experimental study of high density foods for the Space Operations Center

    Science.gov (United States)

    Ahmed, S. M.

    1981-01-01

    The experimental study of high density foods for the Space Operations Center is described. A sensory evaluation of the high density foods was conducted first to test the acceptability of the products. A shelf-life study of the high density foods was also conducted for three different time lengths at three different temperatures. The nutritional analysis of the high density foods is at present incomplete.

  11. A CNES remote operations center for the MSL ChemCam instrument

    Energy Technology Data Exchange (ETDEWEB)

    Wiens, Roger C [Los Alamos National Laboratory; Lafaille, Vivian [CNES; Lorgny, Eric [CNES; Baroukh, Julien [CNES; Gaboriaud, Alain [CNES; Saccoccio, Muriel [CNES; Perez, Rene [CNES; Gasnault, Olivier [CNRS/CESR; Maurice, Sylvestre [CNRS/CESR; Blaney, Diana [JPL

    2010-01-01

    For the first time, a CNES remote operations center in Toulouse will be involved in the tactical operations of a Martian rover in order to operate the ChemCam science instrument in the framework of the NASA MSL (Mars Science Laboratory) mission in 2012. CNES/CESR and LANL have developed and delivered to JPL the ChemCam (Chemistry Camera) instrument located on the top of mast and in the body of the rover. This instrument incorporates a Laser-Induced Breakdown Spectrometer (LIBS) and a Remote Micro-Imager (RMI) for determining elemental compositions of rock targets or soil samples at remote distances from the rover (2-7 m). An agreement has been achieved for operating ChemCam, alternatively, from Toulouse (FR) and Los Alamos (NM, USA), through the JPL ground data system in Pasadena (CA, USA) for a complete Martian year (2 years on Earth). After a brief overview of the MSL mission, this paper presents the instrument, the mission operational system and JPL organization requirements for the scientific investigators (PI and Co-Is). This paper emphasizes innovations applied on the ground segment components and on the operational approach to satisfy the requirements and constraints due to these shared and distributed operations over the world.

  12. Integrated Robot-Human Control in Mining Operations

    Energy Technology Data Exchange (ETDEWEB)

    George Danko

    2007-09-30

    This report contains a detailed description of the work conducted for the project on Integrated Robot-Human Control in Mining Operations at University of Nevada, Reno. This project combines human operator control with robotic control concepts to create a hybrid control architecture, in which the strengths of each control method are combined to increase machine efficiency and reduce operator fatigue. The kinematics reconfiguration type differential control of the excavator implemented with a variety of 'software machine kinematics' is the key feature of the project. This software re-configured excavator is more desirable to execute a given digging task. The human operator retains the master control of the main motion parameters, while the computer coordinates the repetitive movement patterns of the machine links. These repetitive movements may be selected from a pre-defined family of trajectories with different transformations. The operator can make adjustments to this pattern in real time, as needed, to accommodate rapidly-changing environmental conditions. A working prototype has been developed using a Bobcat 435 excavator. The machine is operational with or without the computer control system depending on whether the computer interface is on or off. In preparation for emulated mining tasks tests, typical, repetitive tool trajectories during surface mining operations were recorded at the Newmont Mining Corporation's 'Lone Tree' mine in Nevada. Analysis of these working trajectories has been completed. The motion patterns, when transformed into a family of curves, may serve as the basis for software-controlled machine kinematics transformation in the new human-robot control system. A Cartesian control example has been developed and tested both in simulation and on the experimental excavator. Open-loop control is robustly stable and free of short-term dynamic problems, but it allows for drifting away from the desired motion kinematics of the

  13. CV controls from design to operation

    CERN Document Server

    Blanc, D

    2002-01-01

    The cooling and Ventilation (CV) group has emphasised the need to redefine its organisational structure at the end of 98. The main objective of this operation was to ensure the CV group to be more competitive and efficient through the growing tasks of the LHC projects. The main evolution given to this reorganisation is that the new structure is more project oriented and then operates on three distinct axes: Design, Work and Operation. Process control project management requires a complete and early interaction and participation of all the actors involved. This procedure to be efficient and constructive must be considered and performed not only during the design stage but along the project planning phases and must go beyond the completion work including the process control operation activity. The paper explains the present project management for process control. It describes the present constraints and gives suggestions to a different approach to these projects to improve performances and efficiency of a contr...

  14. Intelligent Control and Operation of Distribution System

    DEFF Research Database (Denmark)

    Bhattarai, Bishnu Prasad

    methodology to ensure efficient control and operation of the future distribution networks. The major scientific challenge is thus to develop control models and strategies to coordinate responses from widely distributed controllable loads and local generations. Detailed models of key Smart Grid (SG) elements...... in this direction but also benefit distribution system operators in the planning and development of the distribution network. The major contributions of this work are described in the following four stages: In the first stage, an intelligent Demand Response (DR) control architecture is developed for coordinating...... the key SG actors, namely consumers, network operators, aggregators, and electricity market entities. A key intent of the architecture is to facilitate market participation of residential consumers and prosumers. A Hierarchical Control Architecture (HCA) having primary, secondary, and tertiary control...

  15. Modeling Control Situations in Power System Operations

    DEFF Research Database (Denmark)

    Saleem, Arshad; Lind, Morten; Singh, Sri Niwas

    2010-01-01

    for intelligent operation and control must represent system features, so that information from measurements can be related to possible system states and to control actions. These general modeling requirements are well understood, but it is, in general, difficult to translate them into a model because of the lack...... of explicit principles for model construction. This paper presents a work on using explicit means-ends model based reasoning about complex control situations which results in maintaining consistent perspectives and selecting appropriate control action for goal driven agents. An example of power system......Increased interconnection and loading of the power system along with deregulation has brought new challenges for electric power system operation, control and automation. Traditional power system models used in intelligent operation and control are highly dependent on the task purpose. Thus, a model...

  16. JWST Wavefront Sensing and Control: Operations Plans, Demonstrations, and Status

    Science.gov (United States)

    Perrin, Marshall; Acton, D. Scott; Lajoie, Charles-Philippe; Knight, J. Scott; Myers, Carey; Stark, Chris; JWST Wavefront Sensing & Control Team

    2018-01-01

    After JWST launches and unfolds in space, its telescope optics will be aligned through a complex series of wavefront sensing and control (WFSC) steps to achieve diffraction-limited performance. This iterative process will comprise about half of the observatory commissioning time (~ 3 out of 6 months). We summarize the JWST WFSC process, schedule, and expectations for achieved performance, and discuss our team’s activities to prepare for an effective & efficient telescope commissioning. During the recently-completed OTIS cryo test at NASA JSC, WFSC demonstrations showed the flight-like operation of the entire JWST active optics and WFSC system from end to end, including all hardware and software components. In parallel, the same test data were processed through the JWST Mission Operations Center at STScI to demonstrate the readiness of ground system components there (such as the flight operations system, data pipelines, archives, etc). Moreover, using the Astronomer’s Proposal Tool (APT), the entire telescope commissioning program has been implemented, reviewed, and is ready for execution. Between now and launch our teams will continue preparations for JWST commissioning, including further rehearsals and testing, to ensure a successful alignment of JWST’s telescope optics.

  17. Applying interactive control to waste processing operations

    International Nuclear Information System (INIS)

    Grasz, E.L.; Merrill, R.D.; Couture, S.A.

    1992-08-01

    At present waste and residue processing includes steps that require human interaction. The risk of exposure to unknown hazardous materials and the potential for radiation contamination motivates the desire to remove operators from these processes. Technologies that facilitate this include glove box robotics, modular systems for remote and automated servicing, and interactive controls that minimize human intervention. LLNL is developing an automated system which is designed to supplant the operator for glove box tasks, thus protecting the operator from the risk of radiation exposure and minimizing operator-associated waste. Although most of the processing can be automated with minimal human interaction, there are some tasks where intelligent intervention is both desirable and necessary to adapt to Enexpected circumstances and events. These activities require that the operator interact with the process using a remote manipulator which provides or reflects a natural feel to the operator. The remote manipulation system which was developed incorporates sensor fusion and interactive control, and provides the operator with an effective means of controlling the robot in a potentially unknown environment. This paper describes recent accomplishments in technology development and integration, and outlines the future goals of Lawrence Livermore National Laboratory for achieving this integrated interactive control capability

  18. Application of fuzzy logic operation and control to BWRs

    International Nuclear Information System (INIS)

    Junichi Tanji; Mitsuo Kinoshita; Takaharu Fukuzaki; Yasuhiro Kobayashi

    1993-01-01

    Fuzzy logic control schemes employing linguistic decision rules for flexible operator control strategies have undergone application tests in dynamic systems. The advantages claimed for fuzzy logic control are its abilities: (a) to facilitate direct use of skillful operator know-how for automatic operation and control of the systems and (b) to provide robust multivariable control for complex plants. The authors have also studied applications of fuzzy logic control to automatic startup operations and load-following control in boiling water reactors, pursuing these same advantages

  19. Controlling operational risk: Concepts and practices

    NARCIS (Netherlands)

    van den Tillaart, A.H.A.J.

    2003-01-01

    The subject of this thesis is controlling 'operational risk' in banks. Operational risk is defined as the risk of losses resulting from inadequate or failed internal processes, people, systems, or from external events. Within this very broad subject, we focus on the place of operational risk

  20. Nuclear power plant control room operator control and monitoring tasks

    International Nuclear Information System (INIS)

    Bovell, C.R.; Beck, M.G.; Carter, R.J.

    1998-01-01

    Oak Ridge National Laboratory is conducting a research project the purpose of which is to develop the technical bases for regulatory review criteria for use in evaluating the safety implications of human factors associated with the use of artificial intelligence and expert systems, and with advanced instrumentation and control (I and C) systems in nuclear power plants (NPP). This report documents the results from Task 8 of that project. The primary objectives of the task was to identify the scope and type of control and monitoring tasks now performed by control-room operators. Another purpose was to address the types of controls and safety systems needed to operate the nuclear plant. The final objective of Task 8 was to identify and categorize the type of information and displays/indicators required to monitor the performance of the control and safety systems. This report also discusses state-of-the-art controls and advanced display devices which will be available for use in control-room retrofits and in control room of future plants. The fundamental types of control and monitoring tasks currently conducted by operators can be divided into four classifications: function monitoring tasks, control manipulation tasks, fault diagnostic tasks, and administrative tasks. There are three general types of controls used in today's NPPs, switches, pushbuttons, and analog controllers. Plant I and C systems include components to achieve a number of safety-related functions: measuring critical plant parameters, controlling critical plant parameters within safety limits, and automatically actuating protective devices if safe limits are exceeded. The types of information monitored by the control-room operators consist of the following parameters: pressure, fluid flow and level, neutron flux, temperature, component status, water chemistry, electrical, and process and area radiation. The basic types of monitoring devices common to nearly all NPP control rooms include: analog meters

  1. Strategies and Decision Support Systems for Integrating Variable Energy Resources in Control Centers for Reliable Grid Operations. Executive Summary

    Energy Technology Data Exchange (ETDEWEB)

    Jones, Lawrence E. [Alstom Grid, Inc., Washington, DC (United States)

    2011-11-01

    This is the executive summary for a report that provides findings from the field regarding the best ways in which to guide operational strategies, business processes and control room tools to support the integration of renewable energy into electrical grids.

  2. Stress, performance, and control room operations

    International Nuclear Information System (INIS)

    Fontaine, C.W.

    1990-01-01

    The notion of control room operator performance being detrimentally affected by stress has long been the focus of considerable conjecture. It is important to gain a better understanding of the validity of this concern for the development of effective severe-accident management approaches. This paper illustrates the undeniable negative impact of stress on a wide variety of tasks. A computer-controlled simulated work environment was designed in which both male and female operators were closely monitored during the course of the study for both stress level (using the excretion of the urine catecholamines epinephrine and norepinephrine as an index) and job performance. The experimental parameters employed by the study when coupled with the subsequent statistical analyses of the results allow one to make some rather striking comments with respect to how a given operator might respond to a situation that he or she perceives to be psychologically stressful (whether the stress be externally or internally generated). The findings of this study clearly indicated that stress does impact operator performance on tasks similar in nature to those conducted by control room operators and hence should be seriously considered in the development of severe-accident management strategies

  3. Organization of Control Units with Operational Addressing

    OpenAIRE

    Alexander A. Barkalov; Roman M. Babakov; Larysa A. Titarenko

    2012-01-01

    The using of operational addressing unit as the block of control unit is proposed. The new structure model of Moore finite-state machine with reduced hardware amount is developed. The generalized structure of operational addressing unit is suggested. An example of synthesis process for Moore finite-state machine with operational addressing unit is given. The analytical researches of proposed structure of control unit are executed.

  4. Extended Operation of Stirling Convertors at NASA Glenn Research Center

    Science.gov (United States)

    Oriti, Salvatore, M.

    2012-01-01

    NASA Glenn Research Center (GRC) has been supporting development of free-piston Stirling conversion technology for spaceflight electrical power generation since 1999. GRC has also been supporting the development of the Advanced Stirling Radioisotope Generator (ASRG) since 2006. A key element of the ASRG project is providing life, reliability, and performance data for the Advanced Stirling Convertor (ASC). The Thermal Energy Conversion branch at GRC is conducting extended operation of several free-piston Stirling convertors. The goal of this effort is to generate long-term performance data (tens of thousands of hours) on multiple units to build a life and reliability database. Currently, GRC is operating 18 convertors. This hardware set includes Technology Demonstration Convertors (TDCs) from Infinia Corporation, of which one pair (TDCs #13 and #14) has accumulated over 60,000 hr (6.8 years) of operation. Also under test are various Sunpower, Inc. convertors that were fabricated during the ASC development activity, including ASC-0, ASC-E (including those in the ASRG engineering unit), and ASC-E2. The ASC-E2s also completed, or are in progress of completing workmanship vibration testing, performance mapping, and extended operation. Two ASC-E2 units will also be used for durability testing, during which components will be stressed to levels above nominal mission usage. Extended operation data analyses from these tests are covered in this paper.

  5. Sustainable Model for Public Health Emergency Operations Centers for Global Settings

    OpenAIRE

    Balajee, S. Arunmozhi; Pasi, Omer G.; Etoundi, Alain Georges M.; Rzeszotarski, Peter; Do, Trang T.; Hennessee, Ian; Merali, Sharifa; Alroy, Karen A.; Phu, Tran Dac; Mounts, Anthony W.

    2017-01-01

    Capacity to receive, verify, analyze, assess, and investigate public health events is essential for epidemic intelligence. Public health Emergency Operations Centers (PHEOCs) can be epidemic intelligence hubs by 1) having the capacity to receive, analyze, and visualize multiple data streams, including surveillance and 2) maintaining a trained workforce that can analyze and interpret data from real-time emerging events. Such PHEOCs could be physically located within a ministry of health epidem...

  6. Development of a Space Station Operations Management System

    Science.gov (United States)

    Brandli, A. E.; McCandless, W. T.

    To enhance the productivity of operations aboard the Space Station, a means must be provided to augment, and frequently to supplant, human effort in support of mission operations and management, both on the ground and onboard. The Operations Management System (OMS), under development at the Johnson Space Center, is one such means. OMS comprises the tools and procedures to facilitate automation of station monitoring, control, and mission planning tasks. OMS mechanizes, and hence rationalizes, execution of tasks traditionally performed by mission planners, the mission control center team, onboard System Management software, and the flight crew.

  7. Development of a Space Station Operations Management System

    Science.gov (United States)

    Brandli, A. E.; Mccandless, W. T.

    1988-01-01

    To enhance the productivity of operations aboard the Space Station, a means must be provided to augment, and frequently to supplant, human effort in support of mission operations and management, both on the ground and onboard. The Operations Management System (OMS), under development at the Johnson Space Center, is one such means. OMS comprises the tools and procedures to facilitate automation of station monitoring, control, and mission planning tasks. OMS mechanizes, and hence rationalizes, execution of tasks traditionally performed by mission planners, the mission control center team, onboard System Management software, and the flight crew.

  8. Nuclear thermal rocket engine operation and control

    International Nuclear Information System (INIS)

    Gunn, S.V.; Savoie, M.T.; Hundal, R.

    1993-06-01

    The operation of a typical Rover/Nerva-derived nuclear thermal rocket (NTR) engine is characterized and the control requirements of the NTR are defined. A rationale for the selection of a candidate diverse redundant NTR engine control system is presented and the projected component operating requirements are related to the state of the art of candidate components and subsystems. The projected operational capabilities of the candidate system are delineated for the startup, full-thrust, shutdown, and decay heat removal phases of the engine operation. 9 refs

  9. The role of the control room operator

    International Nuclear Information System (INIS)

    Williams, M.C.

    A control room operator at an Ontario Hydro nuclear power plant operates a reactor-turbine unit according to approved procedures within imposed constraints to meet the objectives of the organization. A number of operating and administrative tasks make up this role. Control room operators spend approximately six percent of their time physically operating equipment exclusive of upset conditions, and another one percent operating in upset conditions. Testing occupies five percent of an operator's time. Operators must be trained to recognize the entire spectrum of inputs available to them and use them all effectively. Any change in system or unit state is always made according to an approved procedure. Extensive training is required; operators must be taught and pracised in what to do, and must know the reasons behind their actions. They are expected to memorize emergency procedures, to know when to consult operating procedures, and to have sufficient understanding and practice to perform these procedures reliably

  10. Space Operations Learning Center Facebook Application

    Science.gov (United States)

    Lui, Ben; Milner, Barbara; Binebrink, Dan; Kuok, Heng

    2012-01-01

    The proposed Space Operations Learning Center (SOLC) Facebook module, initially code-named Spaceville, is intended to be an educational online game utilizing the latest social networking technology to reach a broad audience base and inspire young audiences to be interested in math, science, and engineering. Spaceville will be a Facebook application/ game with the goal of combining learning with a fun game and social environment. The mission of the game is to build a scientific outpost on the Moon or Mars and expand the colony. Game activities include collecting resources, trading resources, completing simple science experiments, and building architectures such as laboratories, habitats, greenhouses, machine shops, etc. The player is awarded with points and achievement levels. The player s ability increases as his/her points and levels increase. A player can interact with other players using multiplayer Facebook functionality. As a result, a player can discover unexpected treasures through scientific missions, engineering, and working with others. The player creates his/her own avatar with his/her selection of its unique appearance, and names the character. The player controls the avatar to perform activities such as collecting oxygen molecules or building a habitat. From observations of other successful social online games such as Farmville and Restaurant City, a common element of these games is having eye-catching and cartoonish characters, and interesting animations for all activities. This will create a fun, educational, and rewarding environment. The player needs to accumulate points in order to be awarded special items needed for advancing to higher levels. Trophies will be awarded to the player when certain goals are reached or tasks are completed. In order to acquire some special items needed for advancement in the game, the player will need to visit his/her neighboring towns to discover the items. This is the social aspect of the game that requires the

  11. Radiological protection and routinary controls of an activimeter with a cesium and barium sources in an nuclear medicine center

    International Nuclear Information System (INIS)

    Morales L, M.E.

    2006-01-01

    In the present work the results when carrying out the routine controls in a Deluxe Isotope (Calibrator II) equipment, with some sources of Cesium 137 and Barium 133, in a Nuclear Medicine Center that operates from the year 1983 in a modern one construction inside the Institute of Neoplastic Illnesses (INEN) are shown. Taking in account the Radiological Protection measures to verify if the equipment responds to the personnel's demands in the measurements of activities of the diverse radionuclides that are used in different types of exams that are carried out in this Nuclear Medicine Center are the objectives of this work. This Center was equipped initially with donated equipment by the International Atomic Energy Agency (IAEA) with those that it develops assistance, educational works and of research, giving services to patients of the INEN and other public and private medical centers. (Author)

  12. AMS data production facilities at science operations center at CERN

    Science.gov (United States)

    Choutko, V.; Egorov, A.; Eline, A.; Shan, B.

    2017-10-01

    The Alpha Magnetic Spectrometer (AMS) is a high energy physics experiment on the board of the International Space Station (ISS). This paper presents the hardware and software facilities of Science Operation Center (SOC) at CERN. Data Production is built around production server - a scalable distributed service which links together a set of different programming modules for science data transformation and reconstruction. The server has the capacity to manage 1000 paralleled job producers, i.e. up to 32K logical processors. Monitoring and management tool with Production GUI is also described.

  13. Computer-aided dispatch--traffic management center field operational test : state of Utah final report

    Science.gov (United States)

    2006-07-01

    This document provides the final report for the evaluation of the USDOT-sponsored Computer-Aided Dispatch Traffic Management Center Integration Field Operations Test in the State of Utah. The document discusses evaluation findings in the followin...

  14. Engineering Process Monitoring for Control Room Operation

    OpenAIRE

    Bätz, M

    2001-01-01

    A major challenge in process operation is to reduce costs and increase system efficiency whereas the complexity of automated process engineering, control and monitoring systems increases continuously. To cope with this challenge the design, implementation and operation of process monitoring systems for control room operation have to be treated as an ensemble. This is only possible if the engineering of the monitoring information is focused on the production objective and is lead in close coll...

  15. Glycemic control, compliance, and satisfaction for diabetic gravidas in centering group care.

    Science.gov (United States)

    Parikh, Laura I; Jelin, Angie C; Iqbal, Sara N; Belna, Sarah L; Fries, Melissa H; Patel, Misbah; Desale, Sameer; Ramsey, Patrick S

    2017-05-01

    To determine if diabetic gravidas enrolled in Centering® group care have improved glycemic control compared to those attending standard prenatal care. To compare compliance and patient satisfaction between the groups. We conducted a prospective cohort study of diabetics enrolled in centering group care from October 2013 to December 2015. Glycemic control, compliance and patient satisfaction (five-point Likert scale) were evaluated. Student's t-test, Chi-Square and mixed effects model were used to compare outcomes. We compared 20 patients in centering to 28 standard prenatal care controls. Mean fasting blood sugar was lower with centering group care (91.0 versus 105.5 mg/dL, p =0.017). There was no difference in change in fasting blood sugar over time between the two groups (p = 0.458). The percentage of time patients brought their blood glucose logs did not differ between the centering group and standard prenatal care (70.7 versus 73.9%, p = 0.973). Women in centering group care had better patient satisfaction scores for "ability to be seen by a physician" (5 versus 4, p = 0.041) and "time in waiting room" (5 versus 4, p =0.001). Fasting blood sugar was lower for patients in centering group care. Change in blood sugar over time did not differ between groups. Diabetic gravidas enrolled in centering group care report improved patient satisfaction.

  16. Hydrocarbon control strategies for gasoline marketing operations

    Energy Technology Data Exchange (ETDEWEB)

    Norton, R.L.; Sakaida, R.R.; Yamada, M.M.

    1978-05-01

    This informational document provides basic and current descriptions of gasoline marketing operations and methods that are available to control hydrocarbon emissions from these operations. The three types of facilities that are described are terminals, bulk plants, and service stations. Operational and business trends are also discussed. The potential emissions from typical facilities, including transport trucks, are given. The operations which lead to emissions from these facilities include (1) gasoline storage, (2) gasoline loading at terminals and bulk plants, (3) gasoline delivery to bulk plants and service stations, and (4) the refueling of vehicles at service stations. Available and possible methods for controlling emissions are described with their estimated control efficiencies and costs. This report also includes a bibliography of references cited in the text, and supplementary sources of information.

  17. Air quality monitoring of the post-operative recovery room and locations surrounding operating theaters in a medical center in Taiwan.

    Directory of Open Access Journals (Sweden)

    Chin-Sheng Tang

    Full Text Available To prevent surgical site infection (SSI, the airborne microbial concentration in operating theaters must be reduced. The air quality in operating theaters and nearby areas is also important to healthcare workers. Therefore, this study assessed air quality in the post-operative recovery room, locations surrounding the operating theater area, and operating theaters in a medical center. Temperature, relative humidity (RH, and carbon dioxide (CO2, suspended particulate matter (PM, and bacterial concentrations were monitored weekly over one year. Measurement results reveal clear differences in air quality in different operating theater areas. The post-operative recovery room had significantly higher CO2 and bacterial concentrations than other locations. Bacillus spp., Micrococcus spp., and Staphylococcus spp. bacteria often existed in the operating theater area. Furthermore, Acinetobacter spp. was the main pathogen in the post-operative recovery room (18% and traumatic surgery room (8%. The mixed effect models reveal a strong correlation between number of people in a space and high CO2 concentration after adjusting for sampling locations. In conclusion, air quality in the post-operative recovery room and operating theaters warrants attention, and merits long-term surveillance to protect both surgical patients and healthcare workers.

  18. Air quality monitoring of the post-operative recovery room and locations surrounding operating theaters in a medical center in Taiwan.

    Science.gov (United States)

    Tang, Chin-Sheng; Wan, Gwo-Hwa

    2013-01-01

    To prevent surgical site infection (SSI), the airborne microbial concentration in operating theaters must be reduced. The air quality in operating theaters and nearby areas is also important to healthcare workers. Therefore, this study assessed air quality in the post-operative recovery room, locations surrounding the operating theater area, and operating theaters in a medical center. Temperature, relative humidity (RH), and carbon dioxide (CO2), suspended particulate matter (PM), and bacterial concentrations were monitored weekly over one year. Measurement results reveal clear differences in air quality in different operating theater areas. The post-operative recovery room had significantly higher CO2 and bacterial concentrations than other locations. Bacillus spp., Micrococcus spp., and Staphylococcus spp. bacteria often existed in the operating theater area. Furthermore, Acinetobacter spp. was the main pathogen in the post-operative recovery room (18%) and traumatic surgery room (8%). The mixed effect models reveal a strong correlation between number of people in a space and high CO2 concentration after adjusting for sampling locations. In conclusion, air quality in the post-operative recovery room and operating theaters warrants attention, and merits long-term surveillance to protect both surgical patients and healthcare workers.

  19. 47 CFR 90.473 - Operation of internal transmitter control systems through licensed fixed control points.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Operation of internal transmitter control... Transmitter Control Internal Transmitter Control Systems § 90.473 Operation of internal transmitter control systems through licensed fixed control points. An internal transmitter control system may be operated...

  20. Automated support for system's engineering and operations - The development of new paradigms

    Science.gov (United States)

    Truszkowski, Walt; Hall, Gardiner A.; Jaworski, Allan; Zoch, David

    1992-01-01

    Technological developments in spacecraft ground operations are reviewed. The technological, operations-oriented, managerial, and economic factors driving the evolution of the Mission Operations Control Center (MOCC), and its predecessor the Operational Control Center are examined. The functional components of the various MOCC subsystems are outlined. A brief overview is given of the concepts behind the The Knowledge-Based Software Engineering Environment, the Generic Spacecraft Analysis Assistant, and the Knowledge From Pictures tool.

  1. Access control system operation

    International Nuclear Information System (INIS)

    Barnes, L.D.

    1981-06-01

    An automated method for the control and monitoring of personnel movement throughout the site was developed under contract to the Department of Energy by Allied-General Nuclear Services (AGNS) at the Barnwell Nuclear Fuel Plant (BNFP). These automated features provide strict enforcement of personnel access policy without routine patrol officer involvement. Identification methods include identification by employee ID number, identification by voice verification and identification by physical security officer verification. The ability to grant each level of access authority is distributed over the organization to prevent any single individual at any level in the organization from being capable of issuing an authorization for entry into sensitive areas. Each access event is recorded. As access events occur, the inventory of both the entered and the exited control area is updated so that a current inventory is always available for display. The system has been operated since 1979 in a development mode and many revisions have been implemented in hardware and software as areas were added to the system. Recent changes have involved the installation of backup systems and other features required to achieve a high reliability. The access control system and recent operating experience are described

  2. Review of Ground Systems Development and Operations (GSDO) Tools for Verifying Command and Control Software

    Science.gov (United States)

    Aguilar, Michael L.; Bonanne, Kevin H.; Favretto, Jeffrey A.; Jackson, Maddalena M.; Jones, Stephanie L.; Mackey, Ryan M.; Sarrel, Marc A.; Simpson, Kimberly A.

    2014-01-01

    The Exploration Systems Development (ESD) Standing Review Board (SRB) requested the NASA Engineering and Safety Center (NESC) conduct an independent review of the plan developed by Ground Systems Development and Operations (GSDO) for identifying models and emulators to create a tool(s) to verify their command and control software. The NESC was requested to identify any issues or weaknesses in the GSDO plan. This document contains the outcome of the NESC review.

  3. SOSPO-SP: Secure Operation of Sustainable Power Systems Simulation Platform for Real-Time System State Evaluation and Control

    DEFF Research Database (Denmark)

    Morais, Hugo; Vancraeyveld, Pieter; Pedersen, Allan Henning Birger

    2014-01-01

    Measurement Units (PMUs) provides more information and enables wide-area monitoring with accurate timing. One of the challenges in the near future is converting the high quantity and quality of information provided by PMUs into useful knowledge about operational state of a global system. The use of real-time...... simulation in closed-loop is essential to develop and validate new real-time applications of wide-area PMU data. This paper presents a simulation platform developed within the research project Secure Operation of Sustainable Power Systems (SOSPO). The SOSPO simulation platform (SOSPO-SP) functions...... in a closed-loop, integrating new real-time assessment methods to provide useful information to operators in power system control centers and to develop new control methodologies that handle emergency situations and avoid power system blackouts....

  4. 46 CFR 196.85-1 - Magazine operation and control.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Magazine operation and control. 196.85-1 Section 196.85... OPERATIONS Magazine Control § 196.85-1 Magazine operation and control. (a) Keys to magazine spaces and magazine chests shall be kept in the sole control or custody of the Master or one delegated qualified...

  5. Human error mode identification for NPP main control room operations using soft controls

    International Nuclear Information System (INIS)

    Lee, Seung Jun; Kim, Jaewhan; Jang, Seung-Cheol

    2011-01-01

    The operation environment of main control rooms (MCRs) in modern nuclear power plants (NPPs) has considerably changed over the years. Advanced MCRs, which have been designed by adapting digital and computer technologies, have simpler interfaces using large display panels, computerized displays, soft controls, computerized procedure systems, and so on. The actions for the NPP operations are performed using soft controls in advanced MCRs. Soft controls have different features from conventional controls. Operators need to navigate the screens to find indicators and controls and manipulate controls using a mouse, touch screens, and so on. Due to these different interfaces, different human errors should be considered in the human reliability analysis (HRA) for advanced MCRs. In this work, human errors that could occur during operation executions using soft controls were analyzed. This work classified the human errors in soft controls into six types, and the reasons that affect the occurrence of the human errors were also analyzed. (author)

  6. Frequency Control for Island Operation of Bornholm Power System

    DEFF Research Database (Denmark)

    Cha, Seung-Tae; Wu, Qiuwei; Zhao, Haoran

    2014-01-01

    the primary frequency control and the DG units are used to provide the secondary frequency control. As such, the proposed control scheme can strike a balance of the frequency control speed and the energy used from the BESS for the frequency control support. The real-time model of the Bornholm power system......This paper presents a coordinated control strategy of a battery energy storage system (BESS) and distributed generation (DG) units for the island operation of the Danish island of Bornholm. The Bornholm power system is able to transit from the grid connected operation with the Nordic power system...... to the isolated island operation. In order to ensure the secure island operation, the coordinated control of the BESS and the DG has been proposed to stabilize the frequency of the system after the transition to the island operation. In the proposed coordinate control scheme, the BESS is used to provide...

  7. 77 FR 72868 - The Centers for Disease Control (CDC)/Health Resources and Services Administration (HRSA...

    Science.gov (United States)

    2012-12-06

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention The Centers for Disease Control (CDC)/Health Resources and Services Administration (HRSA) Advisory Committee on HIV, Viral... announcements of meetings and other committee management activities, for both the Centers for Disease Control...

  8. Interaction design challenges and solutions for ALMA operations monitoring and control

    Science.gov (United States)

    Pietriga, Emmanuel; Cubaud, Pierre; Schwarz, Joseph; Primet, Romain; Schilling, Marcus; Barkats, Denis; Barrios, Emilio; Vila Vilaro, Baltasar

    2012-09-01

    The ALMA radio-telescope, currently under construction in northern Chile, is a very advanced instrument that presents numerous challenges. From a software perspective, one critical issue is the design of graphical user interfaces for operations monitoring and control that scale to the complexity of the system and to the massive amounts of data users are faced with. Early experience operating the telescope with only a few antennas has shown that conventional user interface technologies are not adequate in this context. They consume too much screen real-estate, require many unnecessary interactions to access relevant information, and fail to provide operators and astronomers with a clear mental map of the instrument. They increase extraneous cognitive load, impeding tasks that call for quick diagnosis and action. To address this challenge, the ALMA software division adopted a user-centered design approach. For the last two years, astronomers, operators, software engineers and human-computer interaction researchers have been involved in participatory design workshops, with the aim of designing better user interfaces based on state-of-the-art visualization techniques. This paper describes the process that led to the development of those interface components and to a proposal for the science and operations console setup: brainstorming sessions, rapid prototyping, joint implementation work involving software engineers and human-computer interaction researchers, feedback collection from a broader range of users, further iterations and testing.

  9. An operating environment for control systems on transputer networks

    NARCIS (Netherlands)

    Tillema, H.G.; Schoute, Albert L.; Wijbrans, K.C.J.; Wijbrans, K.C.J.

    1991-01-01

    The article describes an operating environment for control systems. The environment contains the basic layers of a distributed operating system. The design of this operating environment is based on the requirements demanded by controllers which can be found in complex control systems. Due to the

  10. 21 CFR 111.110 - What quality control operations are required for laboratory operations associated with the...

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 2 2010-04-01 2010-04-01 false What quality control operations are required for laboratory operations associated with the production and process control system? 111.110 Section 111.110 Food... § 111.110 What quality control operations are required for laboratory operations associated with the...

  11. The ORNL Controlled Fusion Atomic Data Center: Overview of Activities 2011

    International Nuclear Information System (INIS)

    Schultz, D.R.

    2011-01-01

    The Controlled Fusion Atomic Data Center (CFADC) of the Oak Ridge National Laboratory continued operation aimed at collecting, evaluating, and disseminating atomic, molecular, and particle-surface interaction (AM and PSI) data needed by both the U.S. and international plasma science communities. This work has been carried out within an overarching atomic physics research group which produces much of the required data through an active experimental and theoretical science program. The production of an annotated bibliography of AM and PSI literature relevant to plasma science continues to be among the most important activities of the data center, forming the basis for the CFADC on-line bibliographic search engine and a significant part of the IAEA A+M Data Unit's 'International Bulletin on Atomic and Molecular Data for Fusion.' Also chief among the data center's activities are responses to specific data requests from the plasma science community, leading to either rapid feedback using existing data resources or long term data production projects, as well as participation in IAEA Coordinated Research Programs including recently 'Data for Surface Composition Dynamics Relevant to Erosion Processes' and 'Atomic and Molecular Data for Plasma Modeling.' Highlights of recent data production projects include the following: Experimental and theoretical data for inelastic electron-hydrocarbon reactions, large scale computational results for particle reflection from surfaces, measurements of chemical sputtering from carbon, inaugural experiments considering molecular ion collisions with neutral hydrogen, and expansion of the database of elastic and related transport cross sections calculated for intrinsic and extrinsic impurities in hydrogen plasmas. Progress is being hampered owing to news from the US Department of Energy that it plans to close out the program after a ramp down of funding in 2012, following a distinguished 52 year history of contributions to the US and

  12. Developing control room operator selection procedures

    International Nuclear Information System (INIS)

    Bosshardt, M.J.; Bownas, D.A.

    1979-01-01

    PDRI is performing a two-year study to identify the tasks performed and attributes required in electric power generating plant operating jobs, and focusing on the control room operator position. Approximately 65 investor-owned utilities are participating in the study

  13. The operation quality indicator at the CNOS/COSR-N - a new methodological concept for the process control; O indicador de qualidade da operacao no CNOS/COSR-N (Centro Nacional de Operacao do Sistema e Centro Regional de Operacao Norte), um novo conceito metodologico e de controle de processo

    Energy Technology Data Exchange (ETDEWEB)

    Oliveira, Adel Mendonca Souza de; Zaroni, Delfim Maduro [ONS - Operador Nacional do Sistema Eletrico, Brasilia, DF (Brazil). Centro Nacional de Operacao do Sistema. Centro Regional de Operacao Norte]. E-mails: adel@ons.org.br; delfim@ons.org.br

    2000-07-01

    This work presents a new methodological concept of the performance indicator developed at the System Operation National Center and at the North Operation Regional Center, in accordance with the ISO-9002 norm. The paper also presents the completely computerized Indicator Calculation Process Control, and the good results obtained with the implantation of the Operation Quality Indicator.

  14. Logistic Regression Analysis of Operational Errors and Routine Operations Using Sector Characteristics

    National Research Council Canada - National Science Library

    Pfleiderer, Elaine M; Scroggins, Cheryl L; Manning, Carol A

    2009-01-01

    ...) and routine operation (RO) traffic samples. OE data were derived from SATORI re-creations of OEs occurring at the Indianapolis Air Route Traffic Control Center between 9/17/2001 and 12/10/2003...

  15. Operator training simulator for nuclear power plant

    International Nuclear Information System (INIS)

    Shiozuka, Hiromi

    1977-01-01

    In nuclear power plants, training of the operators is important. In Japan, presently there are two training centers, one is BWR operation training center at Okuma-cho, Fukushima Prefecture, and another the nuclear power generation training center in Tsuruga City, Fukui Prefecture, where the operators of PWR nuclear power plants are trained. This report describes the BWR operation training center briefly. Operation of a nuclear power plant is divided into three stages of start-up, steady state operation, and shut down. Start-up is divided into the cold-state start-up after the shut down for prolonged period due to periodical inspection or others and the hot-state start-up from stand-by condition after the shut down for a short time. In the cold-state start-up, the correction of reactivity change and the heating-up control to avoid excessive thermal stress to the primary system components are important. The BWR operation training center offers the next three courses, namely beginner's course, retraining course and specific training course. The training period is 12 weeks and the number of trainees is eight/course in the beginner's course. The simulator was manufactured by modeling No. 3 plant of Fukushima First Nuclear Power Station, Tokyo Electric Power Co. The simulator is composed of the mimic central control panel and the digital computer. The software system comprises the monitor to supervise the whole program execution, the logic model simulating the plant interlock system and the dynamic model simulating the plant physical phenomena. (Wakatsuki, Y.)

  16. Method for evaluating operator inputs to digital controllers

    International Nuclear Information System (INIS)

    Venhuizen, J.R.

    1983-01-01

    Most industrial processes employ operator-interactive control systems. The performance of these control systems is influenced by the choice of control station (device through which operator enters control commands). While the importance of proper control-station selection is widely accepted, standard and simple selection methods are not available for the control station using color-graphics terminals. This paper describes a unique facility for evaluating the effectiveness of various control stations. In the facility, a process is simulated on a hybrid computer, color-graphics display terminals provide information to the operator, and different control stations accept input commands to control the simulation. Tests are being conducted to evaluate a keyboard, a graphics tablet, and a CRT touch panel for use as control stations on a nuclear power plant. Preliminary results indicate that our facility can be used to determine those situations where each type of station is advantageous

  17. Advanced Outage and Control Center: Strategies for Nuclear Plant Outage Work Status Capabilities

    Energy Technology Data Exchange (ETDEWEB)

    Gregory Weatherby

    2012-05-01

    The research effort is a part of the Light Water Reactor Sustainability (LWRS) Program. LWRS is a research and development program sponsored by the Department of Energy, performed in close collaboration with industry to provide the technical foundations for licensing and managing the long-term, safe and economical operation of current nuclear power plants. The LWRS Program serves to help the US nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of the plants and extension of the current operating licenses. The Outage Control Center (OCC) Pilot Project was directed at carrying out the applied research for development and pilot of technology designed to enhance safe outage and maintenance operations, improve human performance and reliability, increase overall operational efficiency, and improve plant status control. Plant outage management is a high priority concern for the nuclear industry from cost and safety perspectives. Unfortunately, many of the underlying technologies supporting outage control are the same as those used in the 1980’s. They depend heavily upon large teams of staff, multiple work and coordination locations, and manual administrative actions that require large amounts of paper. Previous work in human reliability analysis suggests that many repetitive tasks, including paper work tasks, may have a failure rate of 1.0E-3 or higher (Gertman, 1996). With between 10,000 and 45,000 subtasks being performed during an outage (Gomes, 1996), the opportunity for human error of some consequence is a realistic concern. Although a number of factors exist that can make these errors recoverable, reducing and effectively coordinating the sheer number of tasks to be performed, particularly those that are error prone, has the potential to enhance outage efficiency and safety. Additionally, outage management requires precise coordination of work groups that do not always share similar objectives. Outage

  18. Implementation of the Ohio College Library Center's Proposed Serials Control Subsystem at the University of South Florida Library: Some Preliminary Considerations.

    Science.gov (United States)

    Twitchell, Anne; Sprehn, Mary

    An evaluation of the Ohio College Library Center's (OCLC) proposed Serials Control Subsystem was undertaken to determine what effect the system would have on the operation of the Serials Department at the University of South Florida (USF) Library. The system would consist of three components: 1) claiming--identifying missing issues and generating…

  19. IT Strategic and Operational Controls

    CERN Document Server

    Kyriazoglou, J

    2010-01-01

    This book provides a comprehensive guide to implementing an integrated and flexible set of IT controls in a systematic way. It can help organisations to formulate a complete culture for all areas which must be supervised and controlled; allowing them to simultaneously ensure a secure, high standard whilst striving to obtain the strategic and operational goals of the company.

  20. Operating control techniques for maglev transport systems

    Energy Technology Data Exchange (ETDEWEB)

    Kraft, K H; Schnieder, E

    1984-06-01

    The technical and operational possibilities of magnetic levitation transport systems can only be fully exploited by introducing 'intelligent' control systems which ensure automatic and trouble-free train running. The solution of exacting requirements in the fields of traction dynamics, security and control as well as information gathering transmission and processing is an important prior condition in that respect. The authors report here on the present state of research and development in operating control techniques applicable to maglev transport systems.

  1. 14 CFR 91.1013 - Operational control briefing and acknowledgment.

    Science.gov (United States)

    2010-01-01

    ... Ownership Operations Operational Control § 91.1013 Operational control briefing and acknowledgment. (a) Upon...) Liability risk in the event of a flight-related occurrence that causes personal injury or property damage...

  2. Electric Power Research Institute: Environmental Technology Control Center, report to the Steering committee. Final technical report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    This report describes test for air pollution control of flue gas and mercury as a result of coal combustion. The NYSEG Kintigh Station provided flue gas to the Center 100% of the time during this performance period. As the Kintigh Station operated with a variety of coals, fluctuations in the Center`s inlet SO{sub 2} concentrations were experienced. Safety training for the month was conducted by the O&M Superintendent, Maintenance Supervisor and Shift Supervisors. {open_quotes}Personal Protective Equipment{close_quotes} was the topic of the month. Inspections of the ECTC Facility and safety equipment (SCR air-packs, fire extinguishers, etc.) were completed and recorded this month. All systems were found to be in good condition. By continuing to emphasize safe work habits at the Center, we have raised the total number of days without a lost time injury to 1426 as of 4/30/96. The monthly safety meeting with the NYSEG Kintigh Station was held on April 30, 1996 with both NYSEG and ECTC representatives. The topics of discussion included an overview of NYSEG`s upcoming alternate fuel burn, an update on plant staffing changes, and a discussion of future safety training activities.

  3. MOD control center automated information systems security evolution

    Science.gov (United States)

    Owen, Rich

    1991-01-01

    The role of the technology infusion process in future Control Center Automated Information Systems (AIS) is highlighted. The following subject areas are presented in the form of the viewgraphs: goals, background, threat, MOD's AISS program, TQM, SDLC integration, payback, future challenges, and bottom line.

  4. Optimization of traffic distribution control in software-configurable infrastructure of virtual data center based on a simulation model

    Directory of Open Access Journals (Sweden)

    I. P. Bolodurina

    2017-01-01

    Full Text Available Currently, the proportion of use of cloud computing technology in today's business processes of companies is growing steadily. Despite the fact that it allows you to reduce the cost of ownership and operation of IT infrastructure, there are a number of problems related to the control of data centers. One such problem is the efficiency of the use of available companies compute and network resources. One of the directions of optimization is the process of traffic control of cloud applications and services in data centers. Given the multi-tier architecture of modern data center, this problem does not quite trivial. The advantage of modern virtual infrastructure is the ability to use software-configurable networks and software-configurable data storages. However, existing solutions with algorithmic optimization does not take into account a number of features forming network traffic with multiple classes of applications. Within the framework of the exploration solved the problem of optimizing the distribution of traffic cloud applications and services for the software-controlled virtual data center infrastructure. A simulation model describing the traffic in data center and software-configurable network segments involved in the processing of user requests for applications and services located network environment that includes a heterogeneous cloud platform and software-configurable data storages. The developed model has allowed to implement cloud applications traffic management algorithm and optimize access to the storage system through the effective use of the channel for data transmission. In experimental studies found that the application of the developed algorithm can reduce the response time of cloud applications and services, and as a result improve the performance of processing user requests and to reduce the number of failures.

  5. Systems engineering and integration of control centers in support of multiple programs. [ground control for STS payloads and unmanned vehicles

    Science.gov (United States)

    Miller, David N.

    1989-01-01

    The NASA Johnson Space Center's new Multiprogram Control Center (MPCC) addresses the control requirements of complex STS payloads as well as unmanned vehicles. An account is given of the relationship of the MPCC to the STS Mission Control Center, with a view to significant difficulties that may be encountered and solutions thus far devised for generic problems. Examples of MPCC workstation applications encompass telemetry decommutation, engineering unit conversion, data-base management, trajectory processing, and flight design.

  6. Phasor Simulator for Operator Training Project

    Energy Technology Data Exchange (ETDEWEB)

    Dyer, Jim [Electric Power Group, Llc, Pasadena, CA (United States)

    2016-09-14

    Synchrophasor systems are being deployed in power systems throughout the North American Power Grid and there are plans to integrate this technology and its associated tools into Independent System Operator (ISO)/utility control room operations. A pre-requisite to using synchrophasor technologies in control rooms is for operators to obtain training and understand how to use this technology in real-time situations. The Phasor Simulator for Operator Training (PSOT) project objective was to develop, deploy and demonstrate a pre-commercial training simulator for operators on the use of this technology and to promote acceptance of the technology in utility and ISO/Regional Transmission Owner (RTO) control centers.

  7. Numerical simulation of energy efficiency measures: control and operational strategies

    International Nuclear Information System (INIS)

    Ardehali, M. M.

    2006-01-01

    The inherent limitation in performance of building envelop components and heating ventilating and air conditioning (HVAC) equipment necessitates the examination of operational strategies for improvement in energy-efficient operation of buildings. Due to the ease of installation and increasing availability of electronic controllers, operational strategies that could be programmed are of particular interest. The Iowa Energy Center in the US has taken the initiative to conduct the necessary assessment of current HVAC technology and the commonly-used operational strategies for commercial and industrial buildings, as applied to the midwestern part of the country, with weather and energy cost data for Des Moines, Iowa. The first part of this study focused on the energy consumption and cost effectiveness of HVAC systems. The objectives of the second part is concerned with examination of various operational strategies, namely, night purge (NP), fan optimum start and stop (OSS), condenser water reset (CWR), and chilled water reset (CHWR) applied to order and newer-type commercial office buildings. The indoor air quality requirement are met and the latest applicable energy rates from local utility companies are used. The results show that, in general, NP is not an effective strategy in buildings with low thermal mass storage, OSS reduced fan energy, and CWR and CHWR could be effective and require chillers with multi-stage unloading characteristics. The most operationally efficient strategies are the combination of OSS, CWR, and CHWR for the older-type building, and OSS for the newer-type building. Economically, the most effective is the OSS strategy for the older-type building and the CHWR strategy for the newer-type building.(Author)

  8. Computer control for remote wind turbine operation

    Energy Technology Data Exchange (ETDEWEB)

    Manwell, J.F.; Rogers, A.L.; Abdulwahid, U.; Driscoll, J. [Univ. of Massachusetts, Amherst, MA (United States)

    1997-12-31

    Light weight wind turbines located in harsh, remote sites require particularly capable controllers. Based on extensive operation of the original ESI-807 moved to such a location, a much more sophisticated controller than the original one has been developed. This paper describes the design, development and testing of that new controller. The complete control and monitoring system consists of sensor and control inputs, the control computer, control outputs, and additional equipment. The control code was written in Microsoft Visual Basic on a PC type computer. The control code monitors potential faults and allows the turbine to operate in one of eight states: off, start, run, freewheel, low wind shut down, normal wind shutdown, emergency shutdown, and blade parking. The controller also incorporates two {open_quotes}virtual wind turbines,{close_quotes} including a dynamic model of the machine, for code testing. The controller can handle numerous situations for which the original controller was unequipped.

  9. Computer-aided dispatch--traffic management center field operational test final detailed test plan : WSDOT deployment

    Science.gov (United States)

    2003-10-01

    The purpose of this document is to expand upon the evaluation components presented in "Computer-aided dispatch--traffic management center field operational test final evaluation plan : WSDOT deployment". This document defines the objective, approach,...

  10. Operational experience with the CEBAF control system

    International Nuclear Information System (INIS)

    Hovater, C.; Chowdhary, M.; Karn, J.; Tiefenback, M.; Zeijts, J. van; Watson, W.

    1996-01-01

    The CEBAF accelerator at Thomas Jefferson National Accelerator Facility (Jefferson Lab) successfully began its experimental nuclear physics program in November of 1995 and has since surpassed predicted machine availability. Part of this success can be attributed to using the EPICS (Experimental Physics and Industrial Control System) control system toolkit. The CEBAF control system is one of the largest accelerator control system now operating. It controls approximately 338 SRF cavities, 2,300 magnets, 500 beam position monitors and other accelerator devices, such as gun hardware and other beam monitoring devices. All told, the system must be able to access over 125,000 database records. The system has been well received by both operators and the hardware designers. The EPICS utilities have made the task of troubleshooting systems easier. The graphical and test-based creation tools have allowed operators to custom build control screens. In addition, the ability to integrate EPICS with other software packages, such as Tcl/Tk, has allowed physicists to quickly prototype high-level application programs, and to provide GUI front ends for command line driven tools. Specific examples of the control system applications are presented in the areas of energy and orbit control, cavity tuning and accelerator tune up diagnostics

  11. Development of control system in abdominal operating ROV

    Directory of Open Access Journals (Sweden)

    ZHANG Weikang

    2017-03-01

    Full Text Available In order to satisfy all the requirements of Unmanned Underwater Vehicle(UUVrecovery tasks, a new type of abdominal operating Remote Operated Vehicle(ROV was developed. The abdominal operating ROV is different from the general ROV which works by a manipulator, as it completes the docking and recovery tasks of UUVs with its abdominal operating mechanism. In this paper, the system composition and principles of the abdominal operating ROV are presented. We then propose a framework for a control system in which the integrated industrial reinforced computer acts as a surface monitor unit, while the PC104 embedded industrial computer acts as the underwater master control unit and the other drive boards act as the driver unit. In addition, the dynamics model and a robust H-infinity controller for automatic orientation in the horizontal plane were designed and built. Single tests, system tests and underwater tests show that this control system has good real-time performance and reliability, and it can complete the recovery task of a UUV. The presented structure and algorithm could have reference significance to the control system development of mobile robots, drones, and biomimetic robot.

  12. Implementation of a virtual link between power system testbeds at Marshall Spaceflight Center and Lewis Research Center

    Science.gov (United States)

    Doreswamy, Rajiv

    1990-01-01

    The Marshall Space Flight Center (MSFC) owns and operates a space station module power management and distribution (SSM-PMAD) testbed. This system, managed by expert systems, is used to analyze and develop power system automation techniques for Space Station Freedom. The Lewis Research Center (LeRC), Cleveland, Ohio, has developed and implemented a space station electrical power system (EPS) testbed. This system and its power management controller are representative of the overall Space Station Freedom power system. A virtual link is being implemented between the testbeds at MSFC and LeRC. This link would enable configuration of SSM-PMAD as a load center for the EPS testbed at LeRC. This connection will add to the versatility of both systems, and provide an environment of enhanced realism for operation of both testbeds.

  13. Operator approach to linear control systems

    CERN Document Server

    Cheremensky, A

    1996-01-01

    Within the framework of the optimization problem for linear control systems with quadratic performance index (LQP), the operator approach allows the construction of a systems theory including a number of particular infinite-dimensional optimization problems with hardly visible concreteness. This approach yields interesting interpretations of these problems and more effective feedback design methods. This book is unique in its emphasis on developing methods for solving a sufficiently general LQP. Although this is complex material, the theory developed here is built on transparent and relatively simple principles, and readers with less experience in the field of operator theory will find enough material to give them a good overview of the current state of LQP theory and its applications. Audience: Graduate students and researchers in the fields of mathematical systems theory, operator theory, cybernetics, and control systems.

  14. Automatic Power Control for Daily Load-following Operation using Model Predictive Control Method

    Energy Technology Data Exchange (ETDEWEB)

    Yu, Keuk Jong; Kim, Han Gon [KH, Daejeon (Korea, Republic of)

    2009-10-15

    Under the circumstances that nuclear power occupies more than 50%, nuclear power plants are required to be operated on load-following operation in order to make the effective management of electric grid system and enhanced responsiveness to rapid changes in power demand. Conventional reactors such as the OPR1000 and APR1400 have a regulating system that controls the average temperature of the reactor core relation to the reference temperature. This conventional method has the advantages of proven technology and ease of implementation. However, this method is unsuitable for controlling the axial power shape, particularly the load following operation. Accordingly, this paper reports on the development of a model predictive control method which is able to control the reactor power and the axial shape index. The purpose of this study is to analyze the behavior of nuclear reactor power and the axial power shape by using a model predictive control method when the power is increased and decreased for a daily load following operation. The study confirms that deviations in the axial shape index (ASI) are within the operating limit.

  15. 75 FR 78997 - Centers for Disease Control and Prevention/Health Resources and Services Administration (CDC/HRSA...

    Science.gov (United States)

    2010-12-17

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Centers for Disease Control and Prevention/Health Resources and Services Administration (CDC/HRSA) Advisory Committee... and other committee management activities, for both the Centers for Disease Control and Prevention and...

  16. General predictive control using the delta operator

    DEFF Research Database (Denmark)

    Jensen, Morten Rostgaard; Poulsen, Niels Kjølstad; Ravn, Ole

    1993-01-01

    This paper deals with two-discrete-time operators, the conventional forward shift-operator and the δ-operator. Both operators are treated in view of construction of suitable solutions to the Diophantine equation for the purpose of prediction. A general step-recursive scheme is presented. Finally...... a general predictive control (GPC) is formulated and applied adaptively to a continuous-time plant...

  17. Computer-aided dispatch--traffic management center field operational test final test plans : state of Utah

    Science.gov (United States)

    2004-01-01

    The purpose of this document is to expand upon the evaluation components presented in "Computer-aided dispatch--traffic management center field operational test final evaluation plan : state of Utah". This document defines the objective, approach, an...

  18. Complete Quantum Control of a Single Silicon-Vacancy Center in a Diamond Nanopillar

    Science.gov (United States)

    Zhang, Jingyuan Linda; Lagoudakis, Konstantinos G.; Tzeng, Yan-Kai; Dory, Constantin; Radulaski, Marina; Kelaita, Yousif; Shen, Zhi-Xun; Melosh, Nicholas A.; Chu, Steven; Vuckovic, Jelena

    Coherent quantum control of a quantum bit (qubit) is an important step towards its use in a quantum network. SiV- center in diamond offers excellent physical qualities such as low inhomogeneous broadening, fast photon emission, and a large Debye-Waller factor, while the fast spin manipulation and techniques to extend the spin coherence time are under active investigation. Here, we demonstrate full coherent control over the state of a single SiV- center in a diamond nanopillar using ultrafast optical pulses. The high quality of the chemical vapor deposition grown SiV- centers allows us to coherently manipulate and quasi-resonantly read out the state of the single SiV- center. Moreover, the SiV- centers being coherently controlled are integrated into diamond nanopillar arrays in a site-controlled, individually addressable manner with high yield, low strain, and high spectral stability, which paves the way for scalable on chip optically accessible quantum system in a quantum photonic network. Financial support is provided by the DOE Office of Basic Energy Sciences, Division of Materials Sciences through Stanford Institute for Materials and Energy Sciences (SIMES) under contract DE-AC02-76SF00515.

  19. Federal Radiological Monitoring and Assessment Center (FRMAC) overview of FRMAC operations

    International Nuclear Information System (INIS)

    1996-02-01

    In the event of a major radiological emergency, 17 federal agencies with various statutory responsibilities have agreed to coordinate their efforts at the emergency scene under the umbrella of the Federal Radiological Emergency Response plan (FRERP). This cooperative effort will assure the designated Lead Federal Agency (LFA) and the state(s) that all federal radiological assistance fully supports their efforts to protect the public. The mandated federal cooperation ensures that each agency can obtain the data critical to its specific responsibilities. This Overview of the Federal Radiological Monitoring and Assessment Center (FRMAC) Operations describes the FRMAC response activities to a major radiological emergency. It also describes the federal assets and subsequent operational activities which provide federal radiological monitoring and assessment of the off-site areas. These off-site areas may include one or more affected states

  20. Live Operation Data Collection Optimization and Communication for the Domestic Nuclear Detection Office's Rail Test Center

    International Nuclear Information System (INIS)

    Gelston, Gariann M.

    2010-01-01

    For the Domestic Nuclear Detection Office's Rail Test Center (i.e., DNDO's RTC), port operation knowledge with flexible collection tools and technique are essential in both technology testing design and implementation intended for live operational settings. Increased contextual data, flexibility in procedures, and rapid availability of information are keys to addressing the challenges of optimization, validation, and analysis within live operational setting data collection. These concepts need to be integrated into technology testing designs, data collection, validation, and analysis processes. A modified data collection technique with a two phased live operation test method is proposed.

  1. Plant status control - with an operational focus

    International Nuclear Information System (INIS)

    Lane, L.A.

    2000-01-01

    In the Nuclear industry, we have done a very good job of designing, developing, constructing, and improving our nuclear facilities. We have, however, often been inconsistent in documenting the details of our facilities, clearly addressing the rules around facility operation, and controlling and tracking the temporary, or permanent changes to our facilities. The reality is, that once we build a facility, we then must operate the facility, for it to be viable. Further we must operate it safely and efficiently for the facility to produce its product, and be acceptable to the public. Unfortunately, when we design and build these large, complicated facilities, we cannot project all the nuances of facility operation, although we can recognize this potential gap, and prepare for it. In order to allow for the complexities of the real world, we must provide the individuals who are tasked with operating our nuclear facilities, with the tools and processes to deal with 'all the nuances' of facility operation. This discussion will focus on the concepts behind a key process for ensuring that we meet our design and operating needs for our facilities, as well as recognizing and dealing with the potential gaps. The key process is 'Plant Status Control', and the discussion will have a primary focus on the needs of the end users, that being the individuals that have the immediate and current accountability for control and safety of the facility, the equipment, the staff, and ultimately the public, that being our Operations staff, and the Shift Manager. (author)

  2. Automatic Control of Freeboard and Turbine Operation

    DEFF Research Database (Denmark)

    Kofoed, Jens Peter; Frigaard, Peter Bak; Friis-Madsen, Erik

    The report deals with the modules for automatic control of freeboard and turbine operation on board the Wave dragon, Nissum Bredning (WD-NB) prototype, and covers what has been going on up to ultimo 2003.......The report deals with the modules for automatic control of freeboard and turbine operation on board the Wave dragon, Nissum Bredning (WD-NB) prototype, and covers what has been going on up to ultimo 2003....

  3. Implementation of an operator model with error mechanisms for nuclear power plant control room operation

    International Nuclear Information System (INIS)

    Suh, Sang Moon; Cheon, Se Woo; Lee, Yong Hee; Lee, Jung Woon; Park, Young Taek

    1996-01-01

    SACOM(Simulation Analyser with Cognitive Operator Model) is being developed at Korea Atomic Energy Research Institute to simulate human operator's cognitive characteristics during the emergency situations of nuclear power plans. An operator model with error mechanisms has been developed and combined into SACOM to simulate human operator's cognitive information process based on the Rasmussen's decision ladder model. The operational logic for five different cognitive activities (Agents), operator's attentional control (Controller), short-term memory (Blackboard), and long-term memory (Knowledge Base) have been developed and implemented on blackboard architecture. A trial simulation with a scenario for emergency operation has been performed to verify the operational logic. It was found that the operator model with error mechanisms is suitable for the simulation of operator's cognitive behavior in emergency situation

  4. User Control Interface for W7-X Plasma Operation

    International Nuclear Information System (INIS)

    Spring, A.; Laqua, H.; Schacht, J.

    2006-01-01

    The WENDELSTEIN 7-X fusion experiment will be a highly complex device operated by a likewise complex control system. The fundamental configuration of the W7-X control system follows two major design principles: It reflects the strict hierarchy of the machine set-up with a set of subordinated components, which in turn can be run autonomously during commissioning and testing. Secondly, it links the basic machine operation (mainly given by the infrastructure status and the components readiness) and the physics program execution (i.e. plasma operation) on each hierarchy level and on different time scales. The complexity of the control system implies great demands on appropriate user interfaces: specialized tools for specific control tasks allowing a dedicated view on the subject to be controlled, hiding complexity wherever possible and reasonable, providing similar operation methods on each hierarchy level and both manual interaction possibilities and a high degree of intelligent automation. The contribution will describe the operation interface for experiment control including the necessary links to the machine operation. The users of ' Xcontrol ' will be both the W7-X session leaders during plasma discharge experiments and the components' or diagnostics' operators during autonomous mode or even laboratory experiments. The main ' Xcontrol ' features, such as program composition and validation, manual and automatic control instruments, resource survey, and process monitoring, will be presented. The implementation principles and the underlying communication will be discussed. (author)

  5. The Air Force Center for Optimal Design and Control

    National Research Council Canada - National Science Library

    Burns, John

    1997-01-01

    This report contains a summary and highlights of the research funded by the Air Force under AFOSR URI Grant F49620-93-1-0280, titled 'Center for Optimal Design and Control of Distributed Parameter Systems' (CODAC...

  6. The Movement Control Battalions Role in Airfield Operations

    Science.gov (United States)

    2016-05-17

    November–December 2015 Army Sustainment44 The 53rd Transportation Bat-talion ( Movement Control) (MCB) arrived in Liberia in support of the...over Internet Pro- tocol. The MCT did not have these capabilities. During the deployment, the 53rd MCB consisted of the headquarters The Movement ...Control Battalion’s Role in Airfield Operations The 53rd Transportation Battalion ( Movement Control) assumed responsibility for airfield operations

  7. Controlling Infrastructure Costs: Right-Sizing the Mission Control Facility

    Science.gov (United States)

    Martin, Keith; Sen-Roy, Michael; Heiman, Jennifer

    2009-01-01

    Johnson Space Center's Mission Control Center is a space vehicle, space program agnostic facility. The current operational design is essentially identical to the original facility architecture that was developed and deployed in the mid-90's. In an effort to streamline the support costs of the mission critical facility, the Mission Operations Division (MOD) of Johnson Space Center (JSC) has sponsored an exploratory project to evaluate and inject current state-of-the-practice Information Technology (IT) tools, processes and technology into legacy operations. The general push in the IT industry has been trending towards a data-centric computer infrastructure for the past several years. Organizations facing challenges with facility operations costs are turning to creative solutions combining hardware consolidation, virtualization and remote access to meet and exceed performance, security, and availability requirements. The Operations Technology Facility (OTF) organization at the Johnson Space Center has been chartered to build and evaluate a parallel Mission Control infrastructure, replacing the existing, thick-client distributed computing model and network architecture with a data center model utilizing virtualization to provide the MCC Infrastructure as a Service. The OTF will design a replacement architecture for the Mission Control Facility, leveraging hardware consolidation through the use of blade servers, increasing utilization rates for compute platforms through virtualization while expanding connectivity options through the deployment of secure remote access. The architecture demonstrates the maturity of the technologies generally available in industry today and the ability to successfully abstract the tightly coupled relationship between thick-client software and legacy hardware into a hardware agnostic "Infrastructure as a Service" capability that can scale to meet future requirements of new space programs and spacecraft. This paper discusses the benefits

  8. Projection Operator: A Step Towards Certification of Adaptive Controllers

    Science.gov (United States)

    Larchev, Gregory V.; Campbell, Stefan F.; Kaneshige, John T.

    2010-01-01

    One of the major barriers to wider use of adaptive controllers in commercial aviation is the lack of appropriate certification procedures. In order to be certified by the Federal Aviation Administration (FAA), an aircraft controller is expected to meet a set of guidelines on functionality and reliability while not negatively impacting other systems or safety of aircraft operations. Due to their inherent time-variant and non-linear behavior, adaptive controllers cannot be certified via the metrics used for linear conventional controllers, such as gain and phase margin. Projection Operator is a robustness augmentation technique that bounds the output of a non-linear adaptive controller while conforming to the Lyapunov stability rules. It can also be used to limit the control authority of the adaptive component so that the said control authority can be arbitrarily close to that of a linear controller. In this paper we will present the results of applying the Projection Operator to a Model-Reference Adaptive Controller (MRAC), varying the amount of control authority, and comparing controller s performance and stability characteristics with those of a linear controller. We will also show how adjusting Projection Operator parameters can make it easier for the controller to satisfy the certification guidelines by enabling a tradeoff between controller s performance and robustness.

  9. Cost of Operating Central Cancer Registries and Factors That Affect Cost: Findings From an Economic Evaluation of Centers for Disease Control and Prevention National Program of Cancer Registries.

    Science.gov (United States)

    Tangka, Florence K L; Subramanian, Sujha; Beebe, Maggie Cole; Weir, Hannah K; Trebino, Diana; Babcock, Frances; Ewing, Jean

    2016-01-01

    The Centers for Disease Control and Prevention (CDC) evaluated the economics of the National Program of Cancer Registries to provide the CDC, the registries, and policy makers with the economics evidence-base to make optimal decisions about resource allocation. Cancer registry budgets are under increasing threat, and, therefore, systematic assessment of the cost will identify approaches to improve the efficiencies of this vital data collection operation and also justify the funding required to sustain registry operations. To estimate the cost of cancer registry operations and to assess the factors affecting the cost per case reported by National Program of Cancer Registries-funded central cancer registries. We developed a Web-based cost assessment tool to collect 3 years of data (2009-2011) from each National Program of Cancer Registries-funded registry for all actual expenditures for registry activities (including those funded by other sources) and factors affecting registry operations. We used a random-effects regression model to estimate the impact of various factors on cost per cancer case reported. The cost of reporting a cancer case varied across the registries. Central cancer registries that receive high-quality data from reporting sources (as measured by the percentage of records passing automatic edits) and electronic data submissions, and those that collect and report on a large volume of cases had significantly lower cost per case. The volume of cases reported had a large effect, with low-volume registries experiencing much higher cost per case than medium- or high-volume registries. Our results suggest that registries operate with substantial fixed or semivariable costs. Therefore, sharing fixed costs among low-volume contiguous state registries, whenever possible, and centralization of certain processes can result in economies of scale. Approaches to improve quality of data submitted and increasing electronic reporting can also reduce cost.

  10. Belt conveyor dynamics in transient operation for speed control

    OpenAIRE

    He, D.; Pang, Y.; Lodewijks, G.

    2016-01-01

    Belt conveyors play an important role in continuous dry bulk material transport, especially at the mining industry. Speed control is expected to reduce the energy consumption of belt conveyors. Transient operation is the operation of increasing or decreasing conveyor speed for speed control. According to literature review, current research rarely takes the conveyor dynamics in transient operation into account. However, in belt conveyor speed control, the conveyor dynamic behaviors are signifi...

  11. Experience on operational safety improvement of control and operation support systems

    International Nuclear Information System (INIS)

    Itoh, N.; Nakagawa, T.; Mano, K.

    1988-01-01

    Japanese nuclear industry started in 1956 and about 30 years have passed since that time. Through these years, we have made a lot of efforts and developments in the field of Control and Instrumentation (C and I) system. The above 30 years and following years can be divided into four major periods. The first one is the period of research, the second of domestic production, the third of improvement, and the fourth of advancement. Improvements of C and I system, which we have made in those periods have made a great contribution to enhancement of reliability, availability and operability of nuclear power plants. Fig. 1 shows TEPCO's nuclear power plant (BWR) construction experience and technical trend of C and I system in Japan. This paper is to introduce the efforts and operational experience on control and operation support systems

  12. Operation safety of control systems. Principles and methods

    International Nuclear Information System (INIS)

    Aubry, J.F.; Chatelet, E.

    2008-01-01

    This article presents the main operation safety methods that can be implemented to design safe control systems taking into account the behaviour of the different components with each other (binary 'operation/failure' behaviours, non-consistent behaviours and 'hidden' failures, dynamical behaviours and temporal aspects etc). To take into account these different behaviours, advanced qualitative and quantitative methods have to be used which are described in this article: 1 - qualitative methods of analysis: functional analysis, preliminary risk analysis, failure mode and failure effects analyses; 2 - quantitative study of systems operation safety: binary representation models, state space-based methods, event space-based methods; 3 - application to the design of control systems: safe specifications of a control system, qualitative analysis of operation safety, quantitative analysis, example of application; 4 - conclusion. (J.S.)

  13. Adding control to arbitrary unknown quantum operations

    Science.gov (United States)

    Zhou, Xiao-Qi; Ralph, Timothy C.; Kalasuwan, Pruet; Zhang, Mian; Peruzzo, Alberto; Lanyon, Benjamin P.; O'Brien, Jeremy L.

    2011-01-01

    Although quantum computers promise significant advantages, the complexity of quantum algorithms remains a major technological obstacle. We have developed and demonstrated an architecture-independent technique that simplifies adding control qubits to arbitrary quantum operations—a requirement in many quantum algorithms, simulations and metrology. The technique, which is independent of how the operation is done, does not require knowledge of what the operation is, and largely separates the problems of how to implement a quantum operation in the laboratory and how to add a control. Here, we demonstrate an entanglement-based version in a photonic system, realizing a range of different two-qubit gates with high fidelity. PMID:21811242

  14. Purpose and benefit of control system training for operators

    International Nuclear Information System (INIS)

    Zimoch, E.; Luedeke, A.

    2012-01-01

    The complexity of accelerators is ever increasing and today it is typical that a large number of feedback loops are implemented, based on sophisticated models which describe the underlying physics. Despite this increased complexity the machine operators must still effectively monitor and supervise the desired behavior of the accelerator. This is not alone sufficient; additionally, the correct operation of the control system must also be verified. This is not always easy since the structure, design, and performance of the control system is usually not visualized and is often hidden to the operator. To better deal with this situation operators need some knowledge of the control system in order to react properly in the case of problems. In fact operators need mental models of the control system to recognize fault states and react appropriate to errors and misbehavior of both, the accelerator and the control system itself. Mental models gained only on infrequent experience can be imprecise or plain wrong in worst case. Control system training can provide a foundation to build better mental models and therefore help to enhance operator responses and machine availability. For a refinement of the mental model repeated experience is needed. This can be provided by training sessions at the real accelerator

  15. Development of Improved Graphical Displays for an Advanced Outage Control Center, Employing Human Factors Principles for Outage Schedule Management

    Energy Technology Data Exchange (ETDEWEB)

    St Germain, Shawn Walter [Idaho National Lab. (INL), Idaho Falls, ID (United States); Farris, Ronald Keith [Idaho National Lab. (INL), Idaho Falls, ID (United States); Thomas, Kenneth David [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2015-09-01

    The long-term viability of existing nuclear power plants in the United States (U.S.) is dependent upon a number of factors, including maintaining high capacity factors, maintaining nuclear safety, and reducing operating costs, particularly those associated with refueling outages. Refueling outages typically take 20-30 days, and for existing light water NPPs in the U.S., the reactor cannot be in operation during the outage. Furthermore, given that many NPPs generate between $1-1.5 million/day in revenue when in operation, there is considerable interest in shortening the length of refueling outages. Yet refueling outages are highly complex operations, involving multiple concurrent and dependent activities that are somewhat challenging to coordinate; therefore, finding ways to improve refueling outage performance, while maintaining nuclear safety has proven to be difficult. The Advanced Outage Control Center (AOCC) project is a research and development (R&D) demonstration activity under the LWRS Program. LWRS is an R&D program that works closely with industry R&D programs to establish technical foundations for the licensing and managing of long-term, safe, and economical operation of current fleet of NPPs. As such, the LWRS Advanced Outage Control Center project has the goal of improving the management of commercial NPP refueling outages. To accomplish this goal, INL is developing an advanced outage control center (OCC) that is specifically designed to maximize the usefulness of communication and collaboration technologies for outage coordination and problem resolution activities. The overall focus is on developing an AOCC with the following capabilities that enables plant and OCC staff to; Collaborate in real-time to address emergent issues; Effectively communicate outage status to all workers involved in the outage; Effectively communicate discovered conditions in the field to the OCC; Provide real-time work status; Provide automatic pending support notifications

  16. Development of Improved Graphical Displays for an Advanced Outage Control Center, Employing Human Factors Principles for Outage Schedule Management

    International Nuclear Information System (INIS)

    St Germain, Shawn Walter; Farris, Ronald Keith; Thomas, Kenneth David

    2015-01-01

    The long-term viability of existing nuclear power plants in the United States (U.S.) is dependent upon a number of factors, including maintaining high capacity factors, maintaining nuclear safety, and reducing operating costs, particularly those associated with refueling outages. Refueling outages typically take 20-30 days, and for existing light water NPPs in the U.S., the reactor cannot be in operation during the outage. Furthermore, given that many NPPs generate between $1-1.5 million/day in revenue when in operation, there is considerable interest in shortening the length of refueling outages. Yet refueling outages are highly complex operations, involving multiple concurrent and dependent activities that are somewhat challenging to coordinate; therefore, finding ways to improve refueling outage performance, while maintaining nuclear safety has proven to be difficult. The Advanced Outage Control Center (AOCC) project is a research and development (R&D) demonstration activity under the LWRS Program. LWRS is an R&D program that works closely with industry R&D programs to establish technical foundations for the licensing and managing of long-term, safe, and economical operation of current fleet of NPPs. As such, the LWRS Advanced Outage Control Center project has the goal of improving the management of commercial NPP refueling outages. To accomplish this goal, INL is developing an advanced outage control center (OCC) that is specifically designed to maximize the usefulness of communication and collaboration technologies for outage coordination and problem resolution activities. The overall focus is on developing an AOCC with the following capabilities that enables plant and OCC staff to; Collaborate in real-time to address emergent issues; Effectively communicate outage status to all workers involved in the outage; Effectively communicate discovered conditions in the field to the OCC; Provide real-time work status; Provide automatic pending support notifications

  17. Object-Oriented Technology-Based Software Library for Operations of Water Reclamation Centers

    Science.gov (United States)

    Otani, Tetsuo; Shimada, Takehiro; Yoshida, Norio; Abe, Wataru

    SCADA systems in water reclamation centers have been constructed based on hardware and software that each manufacturer produced according to their design. Even though this approach used to be effective to realize real-time and reliable execution, it is an obstacle to cost reduction about system construction and maintenance. A promising solution to address the problem is to set specifications that can be used commonly. In terms of software, information model approach has been adopted in SCADA systems in other field, such as telecommunications and power systems. An information model is a piece of software specification that describes a physical or logical object to be monitored. In this paper, we propose information models for operations of water reclamation centers, which have not ever existed. In addition, we show the feasibility of the information model in terms of common use and processing performance.

  18. Benefit of an operating vehicle preventing peritonitis in peritoneal dialysis patients: a retrospective, case-controlled study.

    Science.gov (United States)

    Fang, Pan; Lu, Jia; Liu, Ying-Hong; Deng, Hong-Mei; Zhang, Lei; Zhang, Hong-Qing

    2018-06-01

    Peritonitis, which is one of the leading complications of peritoneal dialysis (PD) worldwide, severely affected morbidity and mortality of the PD patients. Although many efforts have been made to prevent PD-related peritonitis, it seems impossible to prevent it completely. Many causes have been reported to lead to peritonitis, and contamination during bag exchange is one of the important risk factors for peritonitis. Here, we introduce an operating vehicle, which we invented to provide a sterile and safe space for bag exchange. A single-center, retrospective, case-control study was undertaken to determine whether this operating vehicle has a protective role in preventing peritonitis. In total, 462 continuous ambulatory peritoneal dialysis patients were included in this study from October 2014 to March 2017. According to their personal will, these patients chose to use operating vehicle or traditional method during their bag exchange. The demographic, clinical and laboratory data of these patients in the two groups were collected, analyzed and compared. Of 462 patients with home dialysis, operating vehicle group consisted of 61 patients, and control group consisted of 401 patients. In the control group, over 677 patient-years, peritonitis occurred in 69 of 401 patients (17.2%), while in the operating vehicle group, over 60 patient-years, only 4 of 61 patients (6.6%) had episodes of peritonitis. The number of patients suffered from peritonitis was significantly decreased in the operating vehicle group (P = 0.034). Besides, there were a total of 99 episodes of peritonitis, and the rate was 1 episode every 7.2 patient-years in control group and 1 episode every 12 patient-years in the operating vehicle group. There was significant difference between the two groups (0.013). Positive dialysate cultures were obtained in majority of the peritonitis episodes (60.6%). Operating vehicle might help to reduce PD-related peritonitis by preventing contamination during bag

  19. Improved operability of the CANDU 9 control centre

    International Nuclear Information System (INIS)

    Macbeth, M. J.; Webster, A.

    1996-01-01

    The next generation CANDU nuclear power plant being designed by AECL is the 900 MWe class CANDU 9 station. It is based upon the Darlington CANDU station design which is among the world leaders in capacity factor with low Operation, Maintenance and Administration (OM and A) costs. This Control Centre design includes the proven functionality of existing CANDU control centres (including the Wolsong 2,3, and 4 control centre improvements, such as the Emergency Core Cooling panels), the characteristics identified by systematic design with human factors analysis of operations requirements and the advanced features needed to improve station operability which is made possible by the application of new technology. The CANDU 9 Control Centre provides plant staff with an improved operability capability due to the combination of proveness, systematic design with human factors engineering and enhanced operating features. Significant features which contribute to this improved operability include: · Standard NSP, BOP and F/H panels with controls and indicators integrated by a standard display/presentation philosophy. · Common plant parameter signal database for extensive monitoring, checking, display and annunciation. · Powerful annunciation system allowing alarm filtering, prioritizing and interrogation to enhance staff recognition of events, plant state and required corrective procedural actions. · The use of an overview display to present immediate and uncomplicated plant status information to facilitate operator awareness of unit status in a highly readable and recognizable format. · Extensive cross checking of similar process parameters amongst themselves, with the counterpart safety system parameters and as well as with 'signature' values obtained from known steady state conditions. · Powerful calculation capabilities, using the plant wide database, providing immediate recognizable and readable and readable output data on plant state information and plant state change

  20. Control rod driving mechanism of reactor, control device and operation method therefor

    International Nuclear Information System (INIS)

    Ariyoshi, Masahiko; Matsumoto, Fujio; Matsumoto, Koji; Kinugasa, Kunihiko; Nara, Yoshihiko; Otama, Kiyomaro; Mikami, Takao

    1998-01-01

    The present invention provides a device for and a method of directly driving control rods of an FBR type reactor linearly by a cylinder type linear motor while having a driving shaft as an electric conductor. Namely, a linear induction motor drives a driving shaft connected with a control rod and vertically moving the control rod by electromagnetic force as an electric conductor. The position of the control rod is detected by a position detector. The driving shaft is hung by a wire by way of an electromagnet which is attachably/detachably held. With such a constitution, the driving shaft connected with the control rod can be vertically moved linearly, stopped or kept. Since they can be driven smoothly at a wide range speed, the responsibility and reliability of the reactor operation can be improved. In addition, since responsibility of the control rod operation is high, scram can be conducted by the linear motor. Since the driving mechanism can be simplified, maintenance and inspection operation can be mitigated. (I.S.)

  1. Control Theory Perspective of Effects-Based Thinking and Operations: Modelling "Operations" as a Feedback Control System

    National Research Council Canada - National Science Library

    Farrell, Philip S

    2007-01-01

    This paper explores operations that involve effects-based thinking (EBT) using Control Theory techniques in order to highlight the concept's fundamental characteristics in a simple and straightforward manner...

  2. SMES application for frequency control during islanded microgrid operation

    International Nuclear Information System (INIS)

    Kim, A-Rong; Kim, Gyeong-Hun; Heo, Serim; Park, Minwon; Yu, In-Keun; Kim, Hak-Man

    2013-01-01

    Highlights: ► The operating characteristics of SMES for the frequency control of an islanded microgrid were investigated. ► The SMES contributes well for frequency control in the islanded operation. ► A dual and a single magnet type of SMES have been compared to demonstrate the performances. -- Abstract: This paper analyzes the operating characteristics of a superconducting magnetic energy storage (SMES) for the frequency control of an islanded microgrid operation. In the grid-connected mode of a microgrid, an imbalance between power supply and demand is solved by a power trade with the upstream power grid. The difference in the islanded mode is a critical problem because the microgrid is isolated from any power grid. For this reason, the frequency control during islanded microgrid operation is a challenging issue. A test microgrid in this paper consisted of a wind power generator, a PV generation system, a diesel generator and a load to test the feasibility of the SMES for controlling frequency during islanded operation as well as the transient state varying from the grid-connected mode to the islanded mode. The results show that the SMES contributes well for frequency control in the islanded operation. In addition, a dual and a single magnet type of SMES have been compared to demonstrate the control performance. The dual magnet has the same energy capacity as the single magnet, but there are two superconducting coils and each coil has half inductance of the single magnet. The effectiveness of the SMES application with the simulation results is discussed in detail

  3. SMES application for frequency control during islanded microgrid operation

    Energy Technology Data Exchange (ETDEWEB)

    Kim, A-Rong, E-mail: haven21c@changwon.ac.kr [Changwon National University, Sarim-dong, Changwon 641-773 (Korea, Republic of); Kim, Gyeong-Hun; Heo, Serim; Park, Minwon [Changwon National University, Sarim-dong, Changwon 641-773 (Korea, Republic of); Yu, In-Keun, E-mail: yuik@changwon.ac.kr [Changwon National University, Sarim-dong, Changwon 641-773 (Korea, Republic of); Kim, Hak-Man [University of Incheon, Songdo-dong, Incheon 406-772 (Korea, Republic of)

    2013-01-15

    Highlights: ► The operating characteristics of SMES for the frequency control of an islanded microgrid were investigated. ► The SMES contributes well for frequency control in the islanded operation. ► A dual and a single magnet type of SMES have been compared to demonstrate the performances. -- Abstract: This paper analyzes the operating characteristics of a superconducting magnetic energy storage (SMES) for the frequency control of an islanded microgrid operation. In the grid-connected mode of a microgrid, an imbalance between power supply and demand is solved by a power trade with the upstream power grid. The difference in the islanded mode is a critical problem because the microgrid is isolated from any power grid. For this reason, the frequency control during islanded microgrid operation is a challenging issue. A test microgrid in this paper consisted of a wind power generator, a PV generation system, a diesel generator and a load to test the feasibility of the SMES for controlling frequency during islanded operation as well as the transient state varying from the grid-connected mode to the islanded mode. The results show that the SMES contributes well for frequency control in the islanded operation. In addition, a dual and a single magnet type of SMES have been compared to demonstrate the control performance. The dual magnet has the same energy capacity as the single magnet, but there are two superconducting coils and each coil has half inductance of the single magnet. The effectiveness of the SMES application with the simulation results is discussed in detail.

  4. Multi-center evaluation of post-operative morbidity and mortality after optimal cytoreductive surgery for advanced ovarian cancer.

    Directory of Open Access Journals (Sweden)

    Arash Rafii

    Full Text Available PURPOSE: While optimal cytoreduction is the standard of care for advanced ovarian cancer, the related post-operative morbidity has not been clearly documented outside pioneering centers. Indeed most of the studies are monocentric with inclusions over several years inducing heterogeneity in techniques and goals of surgery. We assessed the morbidity of optimal cytoreduction surgery for advanced ovarian cancer within a short inclusion period in 6 referral centers dedicated to achieve complete cytoreduction. PATIENTS AND METHODS: The 30 last optimal debulking surgeries of 6 cancer centers were included. Inclusion criteria included: stage IIIc- IV ovarian cancer and optimal surgery performed at the site of inclusion. All post-operative complications within 30 days of surgery were recorded and graded using the Memorial secondary events grading system. Student-t, Chi2 and non-parametric statistical tests were performed. RESULTS: 180 patients were included. There was no demographic differences between the centers. 63 patients underwent surgery including intestinal resections (58 recto-sigmoid resection, 24 diaphragmatic resections, 17 splenectomies. 61 patients presented complications; One patient died post-operatively. Major (grade 3-5 complications requiring subsequent surgeries occurred in 21 patients (11.5%. 76% of patients with a major complication had undergone an ultraradical surgery (P = 0.004. CONCLUSION: While ultraradical surgery may result in complete resection of peritoneal disease in advanced ovarian cancer, the associated complication rate is not negligible. Patients should be carefully evaluated and the timing of their surgery optimized in order to avoid major complications.

  5. The MMS Science Data Center: Operations, Capabilities, and Resource.

    Science.gov (United States)

    Larsen, K. W.; Pankratz, C. K.; Giles, B. L.; Kokkonen, K.; Putnam, B.; Schafer, C.; Baker, D. N.

    2015-12-01

    The Magnetospheric MultiScale (MMS) constellation of satellites completed their six month commissioning period in August, 2015 and began science operations. Science operations for the Solving Magnetospheric Acceleration, Reconnection, and Turbulence (SMART) instrument package occur at the Laboratory for Atmospheric and Space Physics (LASP). The Science Data Center (SDC) at LASP is responsible for the data production, management, distribution, and archiving of the data received. The mission will collect several gigabytes per day of particles and field data. Management of these data requires effective selection, transmission, analysis, and storage of data in the ground segment of the mission, including efficient distribution paths to enable the science community to answer the key questions regarding magnetic reconnection. Due to the constraints on download volume, this includes the Scientist-in-the-Loop program that identifies high-value science data needed to answer the outstanding questions of magnetic reconnection. Of particular interest to the community is the tools and associated website we have developed to provide convenient access to the data, first by the mission science team and, beginning March 1, 2016, by the entire community. This presentation will demonstrate the data and tools available to the community via the SDC and discuss the technologies we chose and lessons learned.

  6. Operational trade-offs in reservoir control

    Science.gov (United States)

    Georgakakos, Aris P.

    1993-11-01

    Reservoir operation decisions require constant reevaluation in the face of conflicting objectives, varying hydrologic conditions, and frequent operational policy changes. Optimality is a relative concept very much dependent on the circumstances under which a decision is made. More than anything else, reservoir management authorities need the means to assess the impacts of various operational options. It is their responsibility to define what is desirable after a thorough evaluation of the existing circumstances. This article presents a model designed to generate operational trade-offs common among reservoir systems. The model avoids an all-encompassing problem formulation and distinguishes three operational modes (levels) corresponding to normal, drought, and flood operations. Each level addresses only relevant system elements and uses a static and a dynamic control module to optimize turbine performance within each planning period and temporally. The model is used for planning the operation of the Savannah River System.

  7. Using Distributed Operations to Enable Science Research on the International Space Station

    Science.gov (United States)

    Bathew, Ann S.; Dudley, Stephanie R. B.; Lochmaier, Geoff D.; Rodriquez, Rick C.; Simpson, Donna

    2011-01-01

    In the early days of the International Space Station (ISS) program, and as the organization structure was being internationally agreed upon and documented, one of the principal tenets of the science program was to allow customer-friendly operations. One important aspect of this was to allow payload developers and principle investigators the flexibility to operate their experiments from either their home sites or distributed telescience centers. This telescience concept was developed such that investigators had several options for ISS utilization support. They could operate from their home site, the closest telescience center, or use the payload operations facilities at the Marshall Space Flight Center in Huntsville, Alabama. The Payload Operations Integration Center (POIC) processes and structures were put into place to allow these different options to its customers, while at the same time maintain its centralized authority over NASA payload operations and integration. For a long duration space program with many scientists, researchers, and universities expected to participate, it was imperative that the program structure be in place to successfully facilitate this concept of telescience support. From a payload control center perspective, payload science operations require two major elements in order to make telescience successful within the scope of the ISS program. The first element is decentralized control which allows the remote participants the freedom and flexibility to operate their payloads within their scope of authority. The second element is a strong ground infrastructure, which includes voice communications, video, telemetry, and commanding between the POIC and the payload remote site. Both of these elements are important to telescience success, and both must be balanced by the ISS program s documented requirements for POIC to maintain its authority as an integration and control center. This paper describes both elements of distributed payload

  8. Concluding from operating experience to instrumentation and control systems

    International Nuclear Information System (INIS)

    Pleger, H.; Heinsohn, H.

    1997-01-01

    Where conclusions are drawn from operating experience to instrumentation and control systems, two general statements should be made. First: There have been braekdowns, there have also been deficiencies, but in principle operating experience with the instrumentation and control systems of German nuclear power plants has been good. With respect to the debates about the use of modern digital instrumentation and control systems it is safe to say, secondly, that the instrumentation and control systems currently in use are working reliably. Hence, there is no need at present to replace existing systems for reasons of technical safety. However, that time will come. It is a good thing, therefore, that the use of modern digital instrumentation and control systems is to begin in the field of limiting devices. The operating experience which will thus be accumulated will benefit digital instrumentation and control systems in their qualification process for more demanding applications. This makes proper logging of operating experience an important function, even if it cannot be transferred in every respect. All parties involved therefore should see to it that this operating experience is collected in accordance with criteria agreed upon so as to prevent unwanted surprises later on. (orig.) [de

  9. Activities of the Center for Space Construction

    Science.gov (United States)

    1993-01-01

    The Center for Space Construction (CSC) at the University of Colorado at Boulder is one of eight University Space Engineering Research Centers established by NASA in 1988. The mission of the center is to conduct research into space technology and to directly contribute to space engineering education. The center reports to the Department of Aerospace Engineering Sciences and resides in the College of Engineering and Applied Science. The college has a long and successful track record of cultivating multi-disciplinary research and education programs. The Center for Space Construction is prominent evidence of this record. At the inception of CSC, the center was primarily founded on the need for research on in-space construction of large space systems like space stations and interplanetary space vehicles. The scope of CSC's research has now evolved to include the design and construction of all spacecraft, large and small. Within this broadened scope, our research projects seek to impact the underlying technological basis for such spacecraft as remote sensing satellites, communication satellites, and other special purpose spacecraft, as well as the technological basis for large space platforms. The center's research focuses on three areas: spacecraft structures, spacecraft operations and control, and regolith and surface systems. In the area of spacecraft structures, our current emphasis is on concepts and modeling of deployable structures, analysis of inflatable structures, structural damage detection algorithms, and composite materials for lightweight structures. In the area of spacecraft operations and control, we are continuing our previous efforts in process control of in-orbit structural assembly. In addition, we have begun two new efforts in formal approach to spacecraft flight software systems design and adaptive attitude control systems. In the area of regolith and surface systems, we are continuing the work of characterizing the physical properties of lunar

  10. Introduction to the Centers for Disease Control and Prevention and the Healthcare Infection Control Practices Advisory Committee Guideline for the Prevention of Surgical Site Infections.

    Science.gov (United States)

    Solomkin, Joseph S; Mazuski, John; Blanchard, Joan C; Itani, Kamal M F; Ricks, Philip; Dellinger, E Patchen; Allen, George; Kelz, Rachel; Reinke, Caroline E; Berríos-Torres, Sandra I

    Surgical site infection (SSI) is a common type of health-care-associated infection (HAI) and adds considerably to the individual, social, and economic costs of surgical treatment. This document serves to introduce the updated Guideline for the Prevention of SSI from the Centers for Disease Control and Prevention (CDC) and the Healthcare Infection Control Practices Advisory Committee (HICPAC). The Core section of the guideline addresses issues relevant to multiple surgical specialties and procedures. The second procedure-specific section focuses on a high-volume, high-burden procedure: Prosthetic joint arthroplasty. While many elements of the 1999 guideline remain current, others warrant updating to incorporate new knowledge and changes in the patient population, operative techniques, emerging pathogens, and guideline development methodology.

  11. Federal Radiological Monitoring and Assessment Center Overview of FRMAC Operations

    International Nuclear Information System (INIS)

    1998-01-01

    In the event of a major radiological emergency, 17 federal agencies with various statutory responsibilities have agreed to coordinate their efforts at the emergency scene under the umbrella of the Federal Radiological Emergency Response Plan. This cooperative effort will ensure that all federal radiological assistance fully supports their efforts to protect the public. the mandated federal cooperation ensures that each agency can obtain the data critical to its specific responsibilities. This Overview of Federal Radiological Monitoring and Assessment Center (FRMAC) describes the FRMAC response activities to a major radiological emergency. It also describes the federal assets and subsequent operational activities which provide federal radiological monitoring and assessment of the off-site areas

  12. Organizational structure and operation of defense/aerospace information centers in the United States of America

    Science.gov (United States)

    Sauter, H. E.; Lushina, L. N.

    1983-01-01

    U.S. Government aerospace and defense information centers are addressed. DTIC and NASA are described in terms of their history, operational authority, information services provided, user community, sources of information collected, efforts under way to improve services, and external agreements regarding the exchange of documents and/or data bases. Contents show how DTIC and NASA provide aerospace/defense information services in support of U.S. research and development efforts. In a general introduction, the importance of scientific and technical information and the need for information centers to acquire, handle, and disseminate it are stressed.

  13. Bituminization of radioactive wastes at the Nuclear Research Center Karlsruhe. Experience from plant operation and development work

    Energy Technology Data Exchange (ETDEWEB)

    Hild, W; Kluger, W; Krause, H

    1976-05-01

    A summary is given of the main operational experience gained at the Nuclear Research Center Karlsruhe in 4 years operation of the bituminization plant for evaporator concentrates from low- and medium level wastes. At the same time some of the essential results are compiled that have been obtained in the R + D activities on bituminization.

  14. Operational advanced materials control and accountability system

    International Nuclear Information System (INIS)

    Malanify, J.J.; Bearse, R.C.; Christensen, E.L.

    1980-01-01

    An accountancy system based on the Dynamic Materials Accountability (DYMAC) System has been in operation at the Plutonium Processing Facility at the Los Alamos Scientific Laboratory (LASL) since January 1978. This system, now designated the Plutonium Facility/Los Alamos Safeguards System (PF/LASS), has enhanced nuclear material accountability and process control at the LASL facility. The nondestructive assay instruments and the central computer system are operating accurately and reliably. As anticipated, several uses of the system have developed in addition to safeguards, notably scrap control and quality control. The successes of this experiment strongly suggest that implementation of DYMAC-based systems should be attempted at other facilities. 20 refs

  15. Control rod for the operation of nuclear reactor

    International Nuclear Information System (INIS)

    Ishida, Hiromi

    1987-01-01

    Purpose: To conduct spectrum shift operation without complicating the reactor core structures, reducing the probability of failures. Constitution: An operation control rod which is driven while passed vertically in the reactor core comprises a strong absorption portion, moderation portion and weak moderation portion defined orderly from above to below and the length for each of the portions is greater than the effective reactor core height. If the operation control rod is lifted to the maximum limit in the upward direction of the reactor core, the weak moderation portion is corresponded over the effective length of the reactor core. Since the weak moderation portion is filled with zirconium and moderators are not present in the operation control rod, water draining gap is formed, neutron spectral shift is formed, excess reactivity is suppressed, absorption of neutrons to fuel fertile material is increased and the formation of nuclear fission material is increased. From the middle to the final stage of the cycle, the control rod is lowered, by which the moderator/fuel effective volume ratio is increased to increase the reactivity. (Kamimura, M.)

  16. 75 FR 7483 - Advisory Committee to the Director (ACD), Centers for Disease Control (CDC) and Prevention-Ethics...

    Science.gov (United States)

    2010-02-19

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Advisory Committee to the Director (ACD), Centers for Disease Control (CDC) and Prevention--Ethics Subcommittee (ES); Correction AGENCY: Centers for Disease Control and Prevention (CDC), HHS. ACTION: Notice of meeting; meeting...

  17. Operation and control of ITER plasmas

    International Nuclear Information System (INIS)

    2001-01-01

    Features incorporated in the design of the International Thermonuclear Experimental Reactor (ITER) tokamak and its ancillary and plasma diagnostic systems that will facilitate operation and control of ignited and/or high-Q DT plasmas are presented. Control methods based upon straight-forward extrapolation of techniques employed in the present generation of tokamaks are found to be adequate and effective for DT plasma control with burn durations of ≥1000 s. Examples of simulations of key plasma control functions including magnetic configuration control and fusion burn (power) control are given. The prospects for the creation and control of steady-state plasmas sustained by non-inductive current drive are also discussed. (author)

  18. Operation and control of ITER plasmas

    International Nuclear Information System (INIS)

    1999-01-01

    Features incorporated in the design of the International Thermonuclear Experimental Reactor (ITER) tokamak and its ancillary and plasma diagnostic systems that will facilitate operation and control of ignited and/or high-Q DT plasmas are presented. Control methods based upon straight-forward extrapolation of techniques employed in the present generation of tokamaks are found to be adequate and effective for DT plasma control with burn durations of ≥1000 s. Examples of simulations of key plasma control functions including magnetic configuration control and fusion burn (power) control are given. The prospects for the creation and control of steady-state plasmas sustained by non-inductive current drive are also discussed. (author)

  19. AN/FSY-3 Space Fence System – Sensor Site One/Operations Center Integration Status and Sensor Site Two Planned Capability

    Science.gov (United States)

    Fonder, G. P.; Hack, P. J.; Hughes, M. R.

    This paper covers two topics related to Space Fence System development: Sensor Site One / Operations Center construction and integration status including risk reduction integration and test efforts at the Moorestown, NJ Integrated Test Bed (ITB); and the planned capability of Sensor Site Two. The AN/FSY-3 Space Fence System is a ground-based system of S-band radars integrated with an Operations Center designed to greatly enhance the Air Force Space Surveillance network. The radar architecture is based on Digital Beam-forming. This capability permits tremendous user-defined flexibility to customize volume surveillance and track sectors instantaneously without impacting routine surveillance functions. Space Fence provides unprecedented sensitivity, coverage and tracking accuracy, and contributes to key mission threads with the ability to detect, track and catalog small objects in LEO, MEO and GEO. The system is net-centric and will seamlessly integrate into the existing Space Surveillance Network, providing services to external users—such as JSpOC—and coordinating handoffs to other SSN sites. Sensor Site One construction on the Kwajalein Atoll is in progress and nearing completion. The Operations Center in Huntsville, Alabama has been configured and will be integrated with Sensor Site One in the coming months. System hardware, firmware, and software is undergoing integration testing at the Mooretown, NJ ITB and will be deployed at Sensor Site One and the Operations Center. The preliminary design for Sensor Site Two is complete and will provide critical coverage, timeliness, and operational flexibility to the overall system.

  20. ADVANCED TOKAMAK OPERATION USING THE DIII-D PLASMA CONTROL SYSTEM

    International Nuclear Information System (INIS)

    HUMPHREYS, DA; FERRON, JR; GAROFALO, AM; HYATT, AW; JERNIGAN, TC; JOHNSON, RD; LAHAYE, RJ; LEUER, JA; OKABAYASHI, M; PENAFLOR, BG; SCOVILLE, JT; STRAIT, EJ; WALKER, ML; WHYTE, DG

    2002-01-01

    A271 ADVANCED TOKAMAK OPERATION USING THE DIII-D PLASMA CONTROL SYSTEM. The principal focus of experimental operations in the DIII-D tokamak is the advanced tokamak (AT) regime to achieve, which requires highly integrated and flexible plasma control. In a high performance advanced tokamak, accurate regulation of the plasma boundary, internal profiles, pumping, fueling, and heating must be well coordinated with MHD control action to stabilize such instabilities as tearing modes and resistive wall modes. Sophisticated monitors of the operational regime must provide detection of off-normal conditions and trigger appropriate safety responses with acceptable levels of reliability. Many of these capabilities are presently implemented in the DIII-D plasma control system (PCS), and are now in frequent or routine operational use. The present work describes recent development, implementation, and operational experience with AT regime control elements for equilibrium control, MHD suppression, and off-normal event detection and response

  1. Control valve friction operational experience at Darlington NGD

    International Nuclear Information System (INIS)

    Speer, B.

    1995-01-01

    Proper installation of valve packing is an important part of ensuring that control valves operate as intended. Darlington NGD has developed a Valve Packing Program. This program combined with valve diagnostics has enabled the station to ensure that the operability of control valves is maintained after repacking. This paper outlines the process that is used for this. (author)

  2. 21 CFR 111.117 - What quality control operations are required for equipment, instruments, and controls?

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 2 2010-04-01 2010-04-01 false What quality control operations are required for equipment, instruments, and controls? 111.117 Section 111.117 Food and Drugs FOOD AND DRUG ADMINISTRATION... and Process Control System: Requirements for Quality Control § 111.117 What quality control operations...

  3. Alaska Center for Unmanned Aircraft Systems Integration (ACUASI): Operational Support and Geoscience Research

    Science.gov (United States)

    Webley, P. W.; Cahill, C. F.; Rogers, M.; Hatfield, M. C.

    2016-12-01

    Unmanned Aircraft Systems (UAS) have enormous potential for use in geoscience research and supporting operational needs from natural hazard assessment to the mitigation of critical infrastructure failure. They provide a new tool for universities, local, state, federal, and military organizations to collect new measurements not readily available from other sensors. We will present on the UAS capabilities and research of the Alaska Center for Unmanned Aircraft Systems Integration (ACUASI, http://acuasi.alaska.edu/). Our UAS range from the Responder with its dual visible/infrared payload that can provide simultaneous data to our new SeaHunter UAS with 90 lb. payload and multiple hour flight time. ACUASI, as a designated US Federal Aviation Administration (FAA) test center, works closely with the FAA on integrating UAS into the national airspace. ACUASI covers all aspects of working with UAS from pilot training, airspace navigation, flight operations, and remote sensing analysis to payload design and integration engineers and policy experts. ACUASI's recent missions range from supporting the mapping of sea ice cover for safe passage of Alaskans across the hazardous winter ice to demonstrating how UAS can be used to provide support during oil spill response. Additionally, we will present on how ACUASI has worked with local authorities in Alaska to integrate UAS into search and rescue operations and with NASA and the FAA on their UAS Transport Management (UTM) project to fly UAS within the manned airspace. ACUASI is also working on developing new capabilities to sample volcanic plumes and clouds, map forest fire impacts and burn areas, and develop a new citizen network for monitoring snow extent and depth during Northern Hemisphere winters. We will demonstrate how UAS can be integrated in operational support systems and at the same time be used in geoscience research projects to provide high precision, accurate, and reliable observations.

  4. [Controlling systems for operating room managers].

    Science.gov (United States)

    Schüpfer, G; Bauer, M; Scherzinger, B; Schleppers, A

    2005-08-01

    Management means developing, shaping and controlling of complex, productive and social systems. Therefore, operating room managers also need to develop basic skills in financial and managerial accounting as a basis for operative and strategic controlling which is an essential part of their work. A good measurement system should include financial and strategic concepts for market position, innovation performance, productivity, attractiveness, liquidity/cash flow and profitability. Since hospitals need to implement a strategy to reach their business objectives, the performance measurement system has to be individually adapted to the strategy of the hospital. In this respect the navigation system developed by Gälweiler is compared to the "balanced score card" system of Kaplan and Norton.

  5. The Columbus-CC—Operating the European laboratory at ISS

    Science.gov (United States)

    Kuch, T.; Sabath, D.

    2008-07-01

    The European ISS Columbus Control Center (Col-CC) joined the club of ISS mission control centers in Moscow, Houston and Huntsville. It took some time to reach that goal. In 1998 the European Space Agency (ESA) awarded the German Aerospace Center DLR to design, develop and implement the Col-CC at its premises in Oberpfaffenhofen, near Munich, Germany. In 2002 a core mission operations team was built up. An integrated team of ESA, industry and control center started to define processes and implemented first operations products and tools. This was accompanied by regular meetings with the international partners in the US and Russia. With intensive training and numerous simulations the team was able to gain experience and is now eagerly waiting for the launch of Columbus. However, thanks to the involvement in some operational activities the Col-CC staff has already been able to gain operational ISS experience. After the inauguration in October 2004 Col-CC supported the Eneide mission in April 2005 when the Italian ESA-Astronaut Roberto Vittori flew onboard a Soyuz to the ISS where he spent 10 days. Another very important milestone was the operations support for ESA's Astrolab mission. The Astrolab mission was of major importance for Europe and particularly for Germany because it implied the first long duration flight of ESA astronaut Thomas Reiter, an astronaut of German nationality. The tasks of Col-CC are described and also the experiences made with the first operational long-term mission which took place from July to December 2006. Meanwhile the Col-CC was able to reach the operational readiness status for the Columbus mission which is set for a launch date later in 2007. Despite the concentration on the challenging Columbus Assembly and Checkout phase emphasis is already laid on the following increments for the European ISS operations. Early 2006 ESA transferred the operational tasks and responsibilities to the hands of the industrial operator. This approach creates

  6. Self operation type reactor control device

    International Nuclear Information System (INIS)

    Saito, Makoto; Gunji, Minoru.

    1990-01-01

    A boiling-requefication chamber containing transporting materials having somewhat higher boiling point that the usual reactor operation temperature and liquid neutron absorbers having a boiling point sufficiently higher than that of the transporting materials is disposed near the coolant exit of a fuel assembly and connected with a tubular chamber in the reactor core with a moving pipe at the bottom. Since the transporting materials in the boiling-requefication chamber is boiled and expanded by heating, the liquid neutron absorbers are introduced passing through the moving pipe into the cylindrical chamber to control the nuclear reactions. When the temperature is lowered by the control, the transporting materials are liquefied to contract the volume and the liquid neutron absorbers in the cylindrical chamber are returned passing through the moving tube into the boiling-liquefication chamber to make the nuclear reaction vigorous. Thus, self-operation type power conditioning and power stopping are enabled not by way of control rods and not requiring external control, to prevent scram failure or misoperation. (N.H.)

  7. Comparative analysis on operation strategies of CCHP system with cool thermal storage for a data center

    International Nuclear Information System (INIS)

    Song, Xu; Liu, Liuchen; Zhu, Tong; Zhang, Tao; Wu, Zhu

    2016-01-01

    Highlights: • Load characteristics of the data center make a good match with CCHP systems. • TRNSYS models was used to simulate the discussed CCHP system in a data center. • Comprehensive system performance under two operation strategies were evaluated. • Cool thermal storage was introduced to reuse the energy surplus by FEL system. • The suitable principle of equipment selection for a FEL system were proposed. - Abstract: Combined Cooling, Heating, and Power (CCHP) systems with cool thermal storage can provide an appropriate energy supply for data centers. In this work, we evaluate the CCHP system performance under two different operation strategies, i.e., following thermal load (FTL) and following electric load (FEL). The evaluation is performed through a case study by using TRNSYS software. In the FEL system, the amount of cool thermal energy generated by the absorption chillers is larger than the cooling load and it can be therefore stored and reused at the off-peak times. Results indicate that systems under both operation strategies have advantages in the fields of energy saving and environmental protection. The largest percentage of reduction of primary energy consumption, CO_2 emissions, and operation cost for the FEL system, are 18.5%, 37.4% and 46.5%, respectively. Besides, the system performance is closely dependent on the equipment selection. The relation between the amount of energy recovered through cool thermal storage and the primary energy consumption has also been taken into account. Moreover, the introduction of cool thermal storage can adjust the heat to power ratio on the energy supply side close to that on the consumer side and consequently promote system flexibility and energy efficiency.

  8. Online social networking and US poison control centers: Facebook as a means of information distribution.

    Science.gov (United States)

    Vo, Kathy; Smollin, Craig

    2015-06-01

    Online social networking services such as Facebook provide a novel medium for the dissemination of public health information by poison control centers in the United States. We performed a cross-sectional study of poison control center Facebook pages to describe and assess the use of this medium. Facebook pages associated with poison control centers were identified during a continuous two-week period from December 24, 2012 to January 7, 2013. Data were extracted from each page, including affiliated poison control center; page duration, measured in years since registration; number of subscribers; number of postings by general toxicological category; and measures of user-generated activity including "likes", "shares", and comments per posting. Among the 56 US poison control centers, 39 Facebook pages were identified, of which 29 were currently active. The total number of active pages has increased by 140% from 2009 to 2013 (average of 25% per year). The total number of all subscribers to active pages was 11,211, ranging from 40 to 2,456 (mean 387, SD 523), equal to 0.006% of all Facebook users in the United States. The number of subscribers per page was associated with page duration, number of postings, and type of postings. The types of toxicological postings were public education (45%), self-promotion (28%), childhood safety (12%), drugs of abuse (8%), environmental poisonings (6%), and general overdoses (1%). Slightly over half of all poison control centers in the United States are supplementing their outreach and education efforts through Facebook. In general, the more active the poison control center on Facebook, the more page followers and follower engagement gained.

  9. Synthesis of budgeting and accounting standard method for «responsibility centers» as information engineering base of operating activities of enterprise

    Directory of Open Access Journals (Sweden)

    I.A. Herasymovych

    2016-07-01

    Full Text Available Market conditions have caused the necessity of introduction at Ukrainian enterprises such a new economic mechanism as financial engineering based on the new approach of synthesis budgeting, «responsibility centers» and managerial accounting by the statutory method in the option of «Direct-costing» (direct costs. The new register «Report of the responsibility center about the work of the pair» which is created in direct costs, is offered for controlling of indexes of the proven budgets about their actual implementation. The main results of the research are: the clear definition of «centers of responsibility» and liability of managers for each item of estimates (budget; the creation of the accounting data signal system about the deviations from standards and changing of the budget norms; the development of operational, accounting records for daily cost accounting; the development of the graphs of document flow on each «responsibility center», which will provide the drafting of internal reporting for implementation of informational indicators, which give an opportunity to evaluate and to control, to predict and to plan the «responsibility centers» activity of an enterprise and also of some of its managers. Scientific novelty and practical value lie in the capacity of «Direct-costing» in terms of financial engineering: 1 it provides rapid determination of budget implementation and the actual cost of production; 2 it allows to determine the «break-even point» which enables to regulate it by options for varying the direct costs or volume and price for selling; 3 according to this method there is no necessity to allocate managerial fixed costs for types of products, as we cannot include them into the results of an enterprise activity.

  10. 'Motor control center obsolescence'

    International Nuclear Information System (INIS)

    Irish, C.S.

    2003-01-01

    A significant and growing problem within the global nuclear industry is the aging of motor control center (MCC) components. MCC's have a very important role in the safety and critical to generation requirements of a nuclear power plant. Although many OEM's MCC's such as ITE/Telemechanique, GE, Westinghouse, Cutler Hammer, Klockner Moeller, etc. have been used throughout the global nuclear industry, they all have one common aspect obsolescence. Obsolescence of various components within the MCC's such as molded case circuit breakers, starters, relays, heaters, contactors, etc. are impacting the reliability of the MCC to serve its intended function. The paper will discuss the options which the nuclear industry is faced with to increase the reliability of the MCC's while maintaining design control, qualification and meeting budget constraints. The options as listed below shall be discussed in detail with examples to enhance the readers understanding of the situation: 1) Component by component replacement: The hurdles associated with trying to find equivalent components to replace the obsolete components while still worki (mechanically and electrically) in the original cubicle will be presented. 2) Complete MCC cubicle with new internal components replacement: The process of supplying a replacement cubicle, with all new internal components and new door to replace the original cubicle will be discussed. The presentation will conclude with a comparison of the advantages and dis-advantages of the two methods to bring the MCC to an as new condition with the overall goal of increasing reliability. (author)

  11. 20 CFR 670.510 - Are Job Corps center operators responsible for providing all vocational training?

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Are Job Corps center operators responsible for providing all vocational training? 670.510 Section 670.510 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR THE JOB CORPS UNDER TITLE I OF THE WORKFORCE INVESTMENT ACT...

  12. Assessment of pollution prevention and control technology for plating operations

    Science.gov (United States)

    Chalmer, Paul D.; Sonntag, William A.; Cushnie, George C., Jr.

    1995-01-01

    The National Center for Manufacturing Sciences (NCMS) is sponsoring an on-going project to assess pollution prevention and control technology available to the plating industry and to make this information available to those who can benefit from it. Completed project activities include extensive surveys of the plating industry and vendors of technologies and an indepth literature review. The plating industry survey was performed in cooperation with the National Association of Metal Finishers. The contractor that conducted the surveys and prepared the project products was CAI Engineering. The initial products of the project were made available in April, 1994. These products include an extensive report that presents the results of the surveys and literature review and an electronic database. The project results are useful for all those associated with pollution prevention and control in the plating industry. The results show which treatment, recovery and bath maintenance technologies have been most successful for different plating processes and the costs for purchasing and operating these technologies. The project results also cover trends in chemical substitution, the identification of compliance-problem pollutants, sludge generation rates, off-site sludge recovery and disposal options, and many other pertinent topics.

  13. Future applications of artificial intelligence to Mission Control Centers

    Science.gov (United States)

    Friedland, Peter

    1991-01-01

    Future applications of artificial intelligence to Mission Control Centers are presented in the form of the viewgraphs. The following subject areas are covered: basic objectives of the NASA-wide AI program; inhouse research program; constraint-based scheduling; learning and performance improvement for scheduling; GEMPLAN multi-agent planner; planning, scheduling, and control; Bayesian learning; efficient learning algorithms; ICARUS (an integrated architecture for learning); design knowledge acquisition and retention; computer-integrated documentation; and some speculation on future applications.

  14. Enhancing Safety at Airline Operations Control Centre

    Directory of Open Access Journals (Sweden)

    Lukáš Řasa

    2015-04-01

    Full Text Available In recent years a new term of Safety Management System (SMS has been introduced into aviation legislation. This system is being adopted by airline operators. One of the groundbased actors of everyday operations is Operations Control Centre (OCC. The goal of this article has been to identify and assess risks and dangers which occur at OCC and create a template for OCC implementation into SMS.

  15. The operation of the GANIL control system

    International Nuclear Information System (INIS)

    Prome, M.; David, L.; Lecorche, E.

    1984-06-01

    When the first GANIL beams were obtained the control system was operating in an elementary way; the system behaved almost like a huge multiplexer. Now a large number of programs have been written; they allow to take benefit of the full power of the computers; they help the operators for starting, tuning and monitoring the accelerator. The paper gives a general description of these programs which are executed on the central computer: it shows how the accelerator is controlled either directly or via dedicated microprocessors. Informations are also given on the alarm system

  16. Control of water chemistry in operating reactors

    International Nuclear Information System (INIS)

    Riess, R.

    1997-01-01

    Water chemistry plays a major role in fuel cladding corrosion and hydriding. Although a full understanding of all mechanisms involved in cladding corrosion does not exist, controlling the water chemistry has achieved quite some progress in recent years. As an example, in PWRs the activity transport is controlled by operating the coolant under higher pH-values (i.e. the ''modified'' B/Li-Chemistry). On the other hand, the lithium concentration is limited to a maximum value of 2 ppm in order to avoid an acceleration of the fuel cladding corrosion. In BWR plants, for example, the industry has learned on how to limit the copper concentration in the feedwater in order to limit CILC (Copper Induced Localized Corrosion) on the fuel cladding. However, economic pressures are leading to more rigorous operating conditions in power reactors. Fuel burnups are to be increased, higher efficiencies are to be achieved, by running at higher temperatures, plant lifetimes are to be extended. In summary, this paper will describe the state of the art in controlling water chemistry in operating reactors and it will give an outlook on potential problems that will arise when going to more severe operating conditions. (author). 3 figs, 6 tabs

  17. Control of water chemistry in operating reactors

    Energy Technology Data Exchange (ETDEWEB)

    Riess, R [Siemens AG Unternehmensbereich KWU, Erlangen (Germany)

    1997-02-01

    Water chemistry plays a major role in fuel cladding corrosion and hydriding. Although a full understanding of all mechanisms involved in cladding corrosion does not exist, controlling the water chemistry has achieved quite some progress in recent years. As an example, in PWRs the activity transport is controlled by operating the coolant under higher pH-values (i.e. the ``modified`` B/Li-Chemistry). On the other hand, the lithium concentration is limited to a maximum value of 2 ppm in order to avoid an acceleration of the fuel cladding corrosion. In BWR plants, for example, the industry has learned on how to limit the copper concentration in the feedwater in order to limit CILC (Copper Induced Localized Corrosion) on the fuel cladding. However, economic pressures are leading to more rigorous operating conditions in power reactors. Fuel burnups are to be increased, higher efficiencies are to be achieved, by running at higher temperatures, plant lifetimes are to be extended. In summary, this paper will describe the state of the art in controlling water chemistry in operating reactors and it will give an outlook on potential problems that will arise when going to more severe operating conditions. (author). 3 figs, 6 tabs.

  18. Rosie: A mobile worksystem for decontamination and dismantlement operations

    International Nuclear Information System (INIS)

    Thompson, B.R.; Conley, L.

    1996-01-01

    RedZone Robotics, Inc. and Carnegie Mellon University's Field Robotics Center have undertaken a contract to develop a next-generation worksystem for decommissioning and dismantlement tasks in Department of Energy (DOE) facilities. Currently, the authors are closing the second phase of this three phase effort and have completed the design and fabrication of the worksystem: Rosie. Rosie includes a locomotor, heavy manipulator, control center, and control system for robot operation. The locomotor is an omni-directional platform with tether management and hydraulic power capabilities. The heavy manipulator is a high-payload, long-reach system intended to deploy tools into the work area. The heavy manipulator is capable of deploying systems such as the Dual-Arm Work Module--a five degree-of-freedom platform supporting two highly dexterous manipulators--or a single manipulator for performing simpler, less dexterous tasks. Rosie is telerobotic to the point of having servo-controlled motions which can be operated and coordinated through the control center

  19. Guidance system operations plan for manned CM earth orbital missions using program SKYLARK 1. Section 4: Operational modes

    Science.gov (United States)

    Dunbar, J. C.

    1972-01-01

    The operational modes for the guidance system operations plan for Program SKYLARK 1 are presented. The procedures control the guidance and navigation system interfaces with the flight crew and the mission control center. The guidance operational concept is designed to comprise a set of manually initiated programs and functions which may be arranged by the flight crew to implement a large class of flight plans. This concept will permit both a late flight plan definition and a capability for real time flight plan changes.

  20. Fluid logic control circuit operates nutator actuator motor

    Science.gov (United States)

    1966-01-01

    Fluid logic control circuit operates a pneumatic nutator actuator motor. It has no moving parts and consists of connected fluid interaction devices. The operation of this circuit demonstrates the ability of fluid interaction devices to operate in a complex combination of series and parallel logic sequence.

  1. Earth Resources Technology Satellite Operations Control Center (OCC). ERTS-B flight activation plan

    Science.gov (United States)

    1974-01-01

    Included in this plan are general objectives through Day 7, operational guidelines and restraints. Following the activation of all subsystems (through Day 3), special series of payload operations were performed to obtain data samples for the different combinations of exposure/gain settings. This took place from Day 4 through Day 7. The Orbit Adjust was employed to perform vernier corrections after the orbit had been defined. The orbit data was collected through Day 3, with the corrections being made from Day 4 through Day 7. ERTS command auxiliary memory (ECAM) was turned on in Day 3 and the memory dumped to a narrow band tape recorder. A verification of memory was done in the off line mode. ECAM was not used in a payload support mode until Day 7.

  2. Belt conveyor dynamics in transient operation for speed control

    NARCIS (Netherlands)

    He, D.; Pang, Y.; Lodewijks, G.

    2016-01-01

    Belt conveyors play an important role in continuous dry bulk material transport, especially at the mining industry. Speed control is expected to reduce the energy consumption of belt conveyors. Transient operation is the operation of increasing or decreasing conveyor speed for speed control.

  3. Functional Gap Analysis of the Maritime Operations Centers

    Science.gov (United States)

    2009-12-01

    Messaging Services TBMCS , DJC2 MI.1.3.5 Manage Suspense Control Capability Gap MI.1.3.6 Provide Component IM Cell Services Capability Gap MI.1.4 Provide...Admin Support MSRT MI.1.3.3 Manage Electronic File Plan Capability Gap MI.1.3.4 Manage Messaging Services TBMCS , DJC2 MI.1.3.5 Manage Suspense...1.5.9 Execute C4 Policies & Procedures for the Joint Operations Area GCCS-J, DCGS-N, TBMCS , CENTRIX-M EHQ.1.11 Sub Component Interagency

  4. Optimal control of operation efficiency of belt conveyor systems

    International Nuclear Information System (INIS)

    Zhang, Shirong; Xia, Xiaohua

    2010-01-01

    The improvement of the energy efficiency of belt conveyor systems can be achieved at equipment or operation levels. Switching control and variable speed control are proposed in literature to improve energy efficiency of belt conveyors. The current implementations mostly focus on lower level control loops or an individual belt conveyor without operational considerations at the system level. In this paper, an optimal switching control and a variable speed drive (VSD) based optimal control are proposed to improve the energy efficiency of belt conveyor systems at the operational level, where time-of-use (TOU) tariff, ramp rate of belt speed and other system constraints are considered. A coal conveying system in a coal-fired power plant is taken as a case study, where great saving of energy cost is achieved by the two optimal control strategies. Moreover, considerable energy saving resulting from VSD based optimal control is also proved by the case study.

  5. Optimal control of operation efficiency of belt conveyor systems

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, Shirong [Department of Automation, Wuhan University, Wuhan 430072 (China); Xia, Xiaohua [Department of Electrical, Electronic and Computer Engineering, University of Pretoria, Pretoria 0002 (South Africa)

    2010-06-15

    The improvement of the energy efficiency of belt conveyor systems can be achieved at equipment or operation levels. Switching control and variable speed control are proposed in literature to improve energy efficiency of belt conveyors. The current implementations mostly focus on lower level control loops or an individual belt conveyor without operational considerations at the system level. In this paper, an optimal switching control and a variable speed drive (VSD) based optimal control are proposed to improve the energy efficiency of belt conveyor systems at the operational level, where time-of-use (TOU) tariff, ramp rate of belt speed and other system constraints are considered. A coal conveying system in a coal-fired power plant is taken as a case study, where great saving of energy cost is achieved by the two optimal control strategies. Moreover, considerable energy saving resulting from VSD based optimal control is also proved by the case study. (author)

  6. Post-operative pain control after tonsillectomy: dexametasone vs tramadol.

    Science.gov (United States)

    Topal, Kubra; Aktan, Bulent; Sakat, Muhammed Sedat; Kilic, Korhan; Gozeler, Mustafa Sitki

    2017-06-01

    Tramadol was found to be more effective than dexamethasone in post-operative pain control, with long-lasting relief of pain. This study aimed to compare the effects of pre-operative local injections of tramadol and dexamethasone on post-operative pain, nausea and vomiting in patients who underwent tonsillectomy. Sixty patients between 3-13 years of age who were planned for tonsillectomy were included in the study. Patients were divided into three groups. Group 1 was the control group. Patients in Group 2 received 0.3 mg/kg Dexamethasone and Group 3 received 0.1 mg/kg Tramadol injection to the peritonsillary space just before the operation. Patients were evaluated for nausea, vomiting, and pain. When the control and the dexamethasone groups were compared; there were statistically significant differences in pain scores at post-operative 15 and 30 min, whereas there was no statistically significant difference in pain scores at other hours. When the control and tramadol groups were compared, there was a statistically significant difference in pain scores at all intervals. When tramadol and dexamethasone groups were compared, there was no statistically significant difference in pain scores at post-operative 15 and 30 min, 1 and 2 h, whereas there was a statistically significant difference in pain scores at post-operative 6 and 24 h.

  7. Simpler ISS Flight Control Communications and Log Keeping via Social Tools and Techniques

    Science.gov (United States)

    Scott, David W.; Cowart, Hugh; Stevens, Dan

    2012-01-01

    The heart of flight operations control involves a) communicating effectively in real time with other controllers in the room and/or in remote locations and b) tracking significant events, decisions, and rationale to support the next set of decisions, provide a thorough shift handover, and troubleshoot/improve operations. International Space Station (ISS) flight controllers speak with each other via multiple voice circuits or loops, each with a particular purpose and constituency. Controllers monitor and/or respond to several loops concurrently. The primary tracking tools are console logs, typically kept by a single operator and not visible to others in real-time. Information from telemetry, commanding, and planning systems also plays into decision-making. Email is very secondary/tertiary due to timing and archival considerations. Voice communications and log entries supporting ISS operations have increased by orders of magnitude because the number of control centers, flight crew, and payload operations have grown. This paper explores three developmental ground system concepts under development at Johnson Space Center s (JSC) Mission Control Center Houston (MCC-H) and Marshall Space Flight Center s (MSFC) Payload Operations Integration Center (POIC). These concepts could reduce ISS control center voice traffic and console logging yet increase the efficiency and effectiveness of both. The goal of this paper is to kindle further discussion, exploration, and tool development.

  8. Operator interface to the ORIC control system

    International Nuclear Information System (INIS)

    Ludemann, C.A.; Casstevens, B.J.

    1983-01-01

    The Oak Ridge Isochronous Cyclotron (ORIC) was built in the early 1960s with a hard-wired manual control system. Presently, it serves as a variable-energy heavy-ion cyclotron with an internal ion source, or as an energy booster for the new 25 MV tandem electrostatic accelerator of the Holifield Heavy Ion Facility. One factor which has kept the cyclotron the productive research tool it is today is the gradual transfer of its control functions to a computer-based system beginning in the 1970s. This particular placement of a computer between an accelerator and its operators afforded some unique challenges and opportunities that would not be encountered today. Historically, the transformation began at a time when computers were just beginning to gain acceptance as reliable operational tools. Veteran operators with tens of years of accelerator experience justifiably expressed skepticism that this improvement would aid them, particularly if they had to re-learn how to operate the machine. The confidence of the operators was gained when they realized that one of the primary principles of ergonomics was being upheld. The computer software and hardware was being designed to serve them and not the computer

  9. SMES application for frequency control during islanded microgrid operation

    Science.gov (United States)

    Kim, A.-Rong; Kim, Gyeong-Hun; Heo, Serim; Park, Minwon; Yu, In-Keun; Kim, Hak-Man

    2013-01-01

    This paper analyzes the operating characteristics of a superconducting magnetic energy storage (SMES) for the frequency control of an islanded microgrid operation. In the grid-connected mode of a microgrid, an imbalance between power supply and demand is solved by a power trade with the upstream power grid. The difference in the islanded mode is a critical problem because the microgrid is isolated from any power grid. For this reason, the frequency control during islanded microgrid operation is a challenging issue. A test microgrid in this paper consisted of a wind power generator, a PV generation system, a diesel generator and a load to test the feasibility of the SMES for controlling frequency during islanded operation as well as the transient state varying from the grid-connected mode to the islanded mode. The results show that the SMES contributes well for frequency control in the islanded operation. In addition, a dual and a single magnet type of SMES have been compared to demonstrate the control performance. The dual magnet has the same energy capacity as the single magnet, but there are two superconducting coils and each coil has half inductance of the single magnet. The effectiveness of the SMES application with the simulation results is discussed in detail.

  10. 77 FR 58847 - Board of Scientific Counselors, National Center for Injury Prevention and Control (BSC, NCIPC)

    Science.gov (United States)

    2012-09-24

    ... the causes, diagnosis, treatment, control, and prevention of physical and mental diseases, and other... DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Board of Scientific Counselors, National Center for Injury Prevention and Control (BSC, NCIPC) In accordance with...

  11. 78 FR 29754 - Board of Scientific Counselors, National Center for Injury Prevention and Control, (BSC, NCIPC)

    Science.gov (United States)

    2013-05-21

    ... relating to the causes, diagnosis, treatment, control, and prevention of physical and mental diseases, and... DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Board of Scientific Counselors, National Center for Injury Prevention and Control, (BSC, NCIPC) In accordance with...

  12. Operational status and future plans for the Los Alamos Neutron Science Center

    International Nuclear Information System (INIS)

    Jones, Kevin W.; Schoenberg, Kurt F.

    2008-01-01

    The Los Alamos Neutron Science Center (LANSCE) continues to be a signature experimental science facility at Los Alamos National Laboratory (LANL). The 800 MeV linear proton accelerator provides multiplexed beams to five unique target stations to produce medical radioisotopes, ultra-cold neutrons, thermal and high energy neutrons for material and nuclear science, and to conduct proton radiography of dynamic events. Recent operating experience will be reviewed and the role of an enhanced LANSCE facility in LANL's new signature facility initiative, Matter and Radiation in Extremes (MaRIE) will be discussed.

  13. Decomposing Objectives and Functions in Power System Operation and Control

    DEFF Research Database (Denmark)

    Heussen, Kai; Lind, Morten

    2009-01-01

    mix of challenges posed by renewable energy sources, demand response technologies and smartgrid concepts, affecting all areas of power system operation. Both, new control modes and changes in market design are required. This paper presents a mean-ends perspective to the analysis of the control......The introduction of many new energy solutions requires the adaptation of classical operation paradigms in power systems. In the standard paradigm, a power system is some equivalent of a synchronous generators, a power line and an uncontrollable load. This paradigm has been challenged by a diverse...... structures and operation paradigms in present power systems. In a top-down approach, traditional frequency- and area-control mechanisms are formalized. It is demonstrated that future power system operation paradigms with different generation control modes and controllable demand can be modeled in a coherent...

  14. Analysis of the operator's tasks: An aid to control room design

    International Nuclear Information System (INIS)

    Blanc, P.; Guesnier, G.P.; Heilbronn, B.; Monnier, B.

    1983-01-01

    The control room designer usually has no knowledge of the tasks performed by the operator in the control room since an overall picture of the situation only becomes available once the whole facility has been constructed. In order to study and design control rooms for its future PWR units, Electricite de France (EDF) felt it was essential to analyse these tasks: the work was facilitated by the existence of 900 MW PWR units which were already in operation and which are controlled in much the same manner as future units of the same type. Accordingly, by analysing the control procedures of these 900 MW PWR units, a data base describing the control and monitoring tasks performed by operators in normal, incident and accident situations has been built up. The data-base files, which were established from a study of 130 control procedures, record all the commands given and data available in the control room (about 7000), describe the tasks connected with these commands and data, and identify the times at which they are made use of by the operator. Using this data base, the principle of operator-system communication and of data processing in the control room of the future has been established: in such a control room, most controls and data will be accessible through computer communication systems to ensure that control and monitoring systems are closely integrated under normal operating conditions as well as in incident and post-accident situations and to enable the plant to be controlled by one or two operators in a seated position. (author)

  15. Development of control system in abdominal operating ROV

    OpenAIRE

    ZHANG Weikang; WANG Guanxue; XU Guohua; LIU Chang; SHEN Xiong

    2017-01-01

    In order to satisfy all the requirements of Unmanned Underwater Vehicle(UUV)recovery tasks, a new type of abdominal operating Remote Operated Vehicle(ROV) was developed. The abdominal operating ROV is different from the general ROV which works by a manipulator, as it completes the docking and recovery tasks of UUVs with its abdominal operating mechanism. In this paper, the system composition and principles of the abdominal operating ROV are presented. We then propose a framework for a control...

  16. Federal Health Care Center: VA and DOD Need to Develop Better Information to Monitor Operations and Improve Efficiency

    Science.gov (United States)

    2017-01-01

    Defense (DOD) responsibility for contracting support Quality assurance Accreditation and oversight from external entities and credentialing and...MTF designation would introduce additional operational requirements and challenges to the FHCC, including financial management and quality assurance...departments—including DOD’s operational readiness mission—by integrating services previously provided by the former North Chicago VA Medical Center

  17. Smart Inverter Control and Operation for Distributed Energy Resources

    Science.gov (United States)

    Tazay, Ahmad F.

    The motivation of this research is to carry out the control and operation of smart inverters and voltage source converters (VSC) for distributed energy resources (DERs) such as photovoltaic (PV), battery, and plug-in hybrid electric vehicles (PHEV). The main contribution of the research includes solving a couple of issues for smart grids by controlling and implementing multifunctions of VSC and smart inverter as well as improving the operational scheme of the microgrid. The work is mainly focused on controlling and operating of smart inverter since it promises a new technology for the future microgrid. Two major applications of the smart inverter will be investigated in this work based on the connection modes: microgrid at grid-tied mode and autonomous mode. In grid-tied connection, the smart inverter and VSC are used to integrate DER such as Photovoltaic (PV) and battery to provide suitable power to the system by controlling the supplied real and reactive power. The role of a smart inverter at autonomous mode includes supplying a sufficient voltage and frequency, mitigate abnormal condition of the load as well as equally sharing the total load's power. However, the operational control of the microgrid still has a major issue on the operation of the microgrid. The dissertation is divided into two main sections which are: 1. Low-level control of a single smart Inverter. 2. High-level control of the microgrid. The first part investigates a comprehensive research for a smart inverter and VSC technology at the two major connections of the microgrid. This involves controlling and modeling single smart inverter and VSC to solve specific issues of microgrid as well as improve the operation of the system. The research provides developed features for smart inverter comparing with a conventional voltage sourced converter (VSC). The two main connections for a microgrid have been deeply investigated to analyze a better way to develop and improve the operational procedure of

  18. Modeling and Control for Islanding Operation of Active Distribution Systems

    DEFF Research Database (Denmark)

    Cha, Seung-Tae; Wu, Qiuwei; Saleem, Arshad

    2011-01-01

    to stabilize the frequency. Different agents are defined to represent different resources in the distribution systems. A test platform with a real time digital simulator (RTDS), an OPen Connectivity (OPC) protocol server and the multi-agent based intelligent controller is established to test the proposed multi......Along with the increasing penetration of distributed generation (DG) in distribution systems, there are more resources for system operators to improve the operation and control of the whole system and enhance the reliability of electricity supply to customers. The distribution systems with DG...... are able to operate in is-landing operation mode intentionally or unintentionally. In order to smooth the transition from grid connected operation to islanding operation for distribution systems with DG, a multi-agent based controller is proposed to utilize different re-sources in the distribution systems...

  19. 49 CFR 236.207 - Electric lock on hand-operated switch; control.

    Science.gov (United States)

    2010-10-01

    ..., AND APPLIANCES Automatic Block Signal Systems Standards § 236.207 Electric lock on hand-operated switch; control. Electric lock on hand-operated switch shall be controlled so that it cannot be unlocked... 49 Transportation 4 2010-10-01 2010-10-01 false Electric lock on hand-operated switch; control...

  20. Quality-Controlled Underway Oceanographic and Meteorological Data from the Center for Ocean-Atmospheric Predictions Center (COAPS) - Shipboard Automated Meteorological and Oceanographic System (SAMOS)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Florida State University has been operating a data assembly center (DAC) to collect, quality evaluate, and distribute Shipboard Automated Meteorological and...

  1. Collective efficacy in a high-fidelity simulation of an airline operations center

    Science.gov (United States)

    Jinkerson, Shanna

    This study investigated the relationships between collective efficacy, teamwork, and team performance. Participants were placed into teams, where they worked together in a high-fidelity simulation of an airline operations center. Each individual was assigned a different role to represent different jobs within an airline (Flight Operations Coordinator, Crew Scheduling, Maintenance, Weather, Flight Scheduling, or Flight Planning.) Participants completed a total of three simulations with an After Action Review between each. Within this setting, both team performance and teamwork behaviors were shown to be positively related to expectations for subsequent performance (collective efficacy). Additionally, teamwork and collective efficacy were not shown to be concomitantly related to subsequent team performance. A chi-square test was used to evaluate existence of performance spirals, and they were not supported. The results of this study were likely impacted by lack of power, as well as a lack of consistency across the three simulations.

  2. Aiding operator performance at low power feedwater control

    International Nuclear Information System (INIS)

    Woods, D.D.

    1986-01-01

    Control of the feedwater system during low power operations (approximately 2% to 30% power) is a difficult task where poor performance (excessive trips) has a high cost to utilities. This paper describes several efforts in the human factors aspects of this task that are underway to improve feedwater control. A variety of knowledge acquisition techniques have been used to understand the details of what makes feedwater control at low power difficult and what knowledge and skill distinguishes expert operators at this task from less experienced ones. The results indicate that there are multiple factors that contribute to task difficulty

  3. Recovery Act: Federspiel Controls (now Vigilent) and State of California Department of General Services Data Center Energy Efficient Cooling Control Demonstration. Final technical project report

    Energy Technology Data Exchange (ETDEWEB)

    Federspiel, Clifford; Evers, Myah

    2011-09-30

    Eight State of California data centers were equipped with an intelligent energy management system to evaluate the effectiveness, energy savings, dollar savings and benefits that arise when powerful artificial intelligence-based technology measures, monitors and actively controls cooling operations. Control software, wireless sensors and mesh networks were used at all sites. Most sites used variable frequency drives as well. The system dynamically adjusts temperature and airflow on the fly by analyzing real-time demands, thermal behavior and historical data collected on site. Taking into account the chaotic interrelationships of hundreds to thousands of variables in a data center, the system optimizes the temperature distribution across a facility while also intelligently balancing loads, outputs, and airflow. The overall project will provide a reduction in energy consumption of more than 2.3 million kWh each year, which translates to $240,000 saved and a reduction of 1.58 million pounds of carbon emissions. Across all sites, the cooling energy consumption was reduced by 41%. The average reduction in energy savings across all the sites that use VFDs is higher at 58%. Before this case study, all eight data centers ran the cooling fans at 100% capacity all of the time. Because of the new technology, cooling fans run at the optimum fan speed maintaining stable air equilibrium while also expending the least amount of electricity. With lower fan speeds, the life of the capital investment made on cooling equipment improves, and the cooling capacity of the data center increases. This case study depicts a rare technological feat: The same process and technology worked cost effectively in eight very different environments. The results show that savings were achieved in centers with diverse specifications for the sizes, ages and types of cooling equipment. The percentage of cooling energy reduction ranged from 19% to 78% while keeping temperatures substantially within the

  4. Photometric Analysis in the Kepler Science Operations Center Pipeline

    Science.gov (United States)

    Twicken, Joseph D.; Clarke, Bruce D.; Bryson, Stephen T.; Tenenbaum, Peter; Wu, Hayley; Jenkins, Jon M.; Girouard, Forrest; Klaus, Todd C.

    2010-01-01

    We describe the Photometric Analysis (PA) software component and its context in the Kepler Science Operations Center (SOC) pipeline. The primary tasks of this module are to compute the photometric flux and photocenters (centroids) for over 160,000 long cadence (thirty minute) and 512 short cadence (one minute) stellar targets from the calibrated pixels in their respective apertures. We discuss the science algorithms for long and short cadence PA: cosmic ray cleaning; background estimation and removal; aperture photometry; and flux-weighted centroiding. We discuss the end-to-end propagation of uncertainties for the science algorithms. Finally, we present examples of photometric apertures, raw flux light curves, and centroid time series from Kepler flight data. PA light curves, centroid time series, and barycentric timestamp corrections are exported to the Multi-mission Archive at Space Telescope [Science Institute] (MAST) and are made available to the general public in accordance with the NASA/Kepler data release policy.

  5. Low-level wastewater treatment facility process control operational test report

    International Nuclear Information System (INIS)

    Bergquist, G.G.

    1996-01-01

    This test report documents the results obtained while conducting operational testing of a new TK 102 level controller and total outflow integrator added to the NHCON software that controls the Low-Level Wastewater Treatment Facility (LLWTF). The test was performed with WHC-SD-CP-OTP 154, PFP Low-Level Wastewater Treatment Facility Process Control Operational Test. A complete test copy is included in appendix A. The new TK 102 level controller provides a signal, hereafter referred to its cascade mode, to the treatment train flow controller which enables the water treatment process to run for long periods without continuous operator monitoring. The test successfully demonstrated the functionality of the new controller under standard and abnormal conditions expected from the LLWTF operation. In addition, a flow totalizer is now displayed on the LLWTF outlet MICON screen which tallies the process output in gallons. This feature substantially improves the ability to retrieve daily process volumes for maintaining accurate material balances

  6. Induction by Coinduction and Control Operators in Call-by-Name

    Directory of Open Access Journals (Sweden)

    Yoshihiko Kakutani

    2013-09-01

    Full Text Available This paper studies emulation of induction by coinduction in a call-by-name language with control operators. Since it is known that call-by-name programming languages with control operators cannot have general initial algebras, interaction of induction and control operators is often restricted to effect-free functions. We show that some class of such restricted inductive types can be derived from full coinductive types by the power of control operators. As a typical example of our results, the type of natural numbers is represented by the type of streams. The underlying idea is a counterpart of the fact that some coinductive types can be expressed by inductive types in call-by-name pure language without side-effects.

  7. Material operating behaviour of ABB BWR control rods

    International Nuclear Information System (INIS)

    Rebensdorff, B.; Bart, G.

    2000-01-01

    The BWR control rods made by ABB use boron carbide (B 4 C and hafnium as absorber material within a cladding of stainless steel. The general behaviour under operation has proven to be very good. ABB and many of their control rod customers have performed extensive inspection programs of control rod behaviour. However, due to changes in the material properties under fast and thermal neutron irradiation defects may occur in the control rods at high neutron fluences. Examinations of irradiated control rod materials have been performed in hot cell laboratories. The examinations have revealed the defect mechanism Irradiation Assisted Stress Corrosion Cracking (IASCC) to appear in the stainless steel cladding. For IASCC to occur three factors have to act simultaneously. Stress, material sensitization and an oxidising environment. Stress may be obtained from boron carbide swelling due to irradiation. Stainless steel may be sensitized to intergranular stress corrosion cracking under irradiation. Normally the reactor environment in a BWR is oxidising. The presentation focuses on findings from hot cell laboratory work on irradiated ABB BWR control rods and studies of irradiated control rod materials in the hot cells at PSI. Apart from physical, mechanical and microstructural examinations, isotope analyses were performed to describe the local isotopic burnup of boron. Consequences (such as possible B 4 C washout) of a under operation in a ABB BWR, after the occurrence of a crack is discussed based on neutron radiographic examinations of control rods operated with cracks. (author)

  8. Design and operation of the emergency support center, CAE; Diseno y explotacion del centro de apoyo en emergencias, CAE

    Energy Technology Data Exchange (ETDEWEB)

    Caro, R. J.; Lopez Trillo, E.

    2016-08-01

    The enhancements developed in Spain in the area of Emergency Management, as consequence of the accident at the Fukushima Dai-Ichi NPP in 2011, included the definition of new emergency response centers; Alternative Center for Emergency Management (CAGE) on each NPP and the Emergency Support Center (CAE), shared by all NPPs. This article summarizes the main features and operation activities undertaken since the establishment of the new CAE, centralized, external to the NPPs shared by all Spanish plants and managed by Tecnatom. (Author)

  9. Shuttle operations era planning for flight operations

    Science.gov (United States)

    Holt, J. D.; Beckman, D. A.

    1984-01-01

    The Space Transportation System (STS) provides routine access to space for a wide range of customers in which cargos vary from single payloads on dedicated flights to multiple payloads that share Shuttle resources. This paper describes the flight operations planning process from payload introduction through flight assignment to execution of the payload objectives and the changes that have been introduced to improve that process. Particular attention is given to the factors that influence the amount of preflight preparation necessary to satisfy customer requirements. The partnership between the STS operations team and the customer is described in terms of their functions and responsibilities in the development of a flight plan. A description of the Mission Control Center (MCC) and payload support capabilities completes the overview of Shuttle flight operations.

  10. Analysis of a tool ergonomic working in air traffic control: perceptions of operators and contributions to workload

    Directory of Open Access Journals (Sweden)

    Arlete Ana Motter

    2012-11-01

    Full Text Available The aim of this study was to evaluate the perception of the operators and the role of the strips in the workload of air traffic controllers in light of the ergonomic analysis of work. It was developed during the data collection for the doctoral thesis defended in 2007 at the Post-graduate in Production Engineering at UFSC. Submitted to and approved by the Ethics Committee  in Research of the  Tuiuti University of Paraná. A number of 35 military operators of both sexes (80% male and 20% female participated, all belonging to the Brazilian Air Force, which carried out their functions in the Second Integrated Center of Air Defense and Air Traffic Control (CINDACTA II, located in Curitiba-PR. It was used the methodology of analysis of work ergonomics. The results made it possible to know the content of the prescribed electronic strip and the complexity of work in real activity, such as the manual entry of the strip and the AFIL flight plan. It was verified that the operators build operational strategies in terms of organization of the strips in order to facilitate their work. The conclusion is that in the work of air traffic controller there are several interacting variables, and when the content of the work required is different from what is established, the workload increases, which may endanger the health of workers as well as aircraft safety.

  11. Feasibility of touch-less control of operating room lights.

    Science.gov (United States)

    Hartmann, Florian; Schlaefer, Alexander

    2013-03-01

    Today's highly technical operating rooms lead to fairly complex surgical workflows where the surgeon has to interact with a number of devices, including the operating room light. Hence, ideally, the surgeon could direct the light without major disruption of his work. We studied whether a gesture tracking-based control of an automated operating room light is feasible. So far, there has been little research on control approaches for operating lights. We have implemented an exemplary setup to mimic an automated light controlled by a gesture tracking system. The setup includes a articulated arm to position the light source and an off-the-shelf RGBD camera to detect the user interaction. We assessed the tracking performance using a robot-mounted hand phantom and ran a number of tests with 18 volunteers to evaluate the potential of touch-less light control. All test persons were comfortable with using the gesture-based system and quickly learned how to move a light spot on flat surface. The hand tracking error is direction-dependent and in the range of several centimeters, with a standard deviation of less than 1 mm and up to 3.5 mm orthogonal and parallel to the finger orientation, respectively. However, the subjects had no problems following even more complex paths with a width of less than 10 cm. The average speed was 0.15 m/s, and even initially slow subjects improved over time. Gestures to initiate control can be performed in approximately 2 s. Two-thirds of the subjects considered gesture control to be simple, and a majority considered it to be rather efficient. Implementation of an automated operating room light and touch-less control using an RGBD camera for gesture tracking is feasible. The remaining tracking error does not affect smooth control, and the use of the system is intuitive even for inexperienced users.

  12. 20 CFR 670.515 - What responsibilities do the center operators have in managing work-based learning?

    Science.gov (United States)

    2010-04-01

    ... have in managing work-based learning? 670.515 Section 670.515 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR THE JOB CORPS UNDER TITLE I OF THE WORKFORCE INVESTMENT ACT... managing work-based learning? (a) The center operator must emphasize and implement work-based learning...

  13. Study of distribution of doses in maintenance operations and interventions in restricted areas of IPEN's radiopharmacy center, Brazil

    International Nuclear Information System (INIS)

    Machado, Jessica S.; Souza, Daiane C.; Rodrigues Junior, Orlando; Gerulis, Eduardo; Todo, Alberto S.

    2013-01-01

    This research was developed at the Radiopharmacy Center of the Nuclear and Energy Research Institute - IPEN/CNEN/SP, Brazil, that performs the production of radiopharmaceuticals with isotopes of the 131 I, 123 I, 201 Tl, 67 Ga, 18 F and 99 Mo for use in nuclear medicine. The radioisotopes are produced on an industrial scale and the installation was designed to meet radiation safety standards and quality control requirements. To ensure the production, there are skilled professionals who perform the tasks of maintenance of the equipment and instruments, installed in the cells of processing of radiopharmaceuticals, without which it is not possible to conduct the work with safety and quality. This study was done a survey called Survey of Variables, based on the maintenance operations and interventions in restricted areas of the Centre of Radiopharmacy and in the survey of the distribution of doses in these tasks, carried out during the period from 2005 to 2011. This research aims to identify and determine the main variables that have an impact on the worker's dose. The results are presented for the Occupationally Exposed Individual variable, variable operation, variable area/Cell, task and Feature variable and variable duration of operation, depending on the Dose variable. It is intended in this way to contribute to improvements in operations in restricted areas that may result in lower individual doses without causing significant changes in the routine of work

  14. Operation of medical accelerator PATRO at Hyogo Ion Beam Medical Center

    International Nuclear Information System (INIS)

    Itano, A.; Akagi, T.; Higashi, A.; Fukushima, S.; Fujita, A.; Honda, Y.; Isa, H.; Nishikigouri, K.

    2004-01-01

    PATRO (Particle Accelerator for Therapy, Radiology and Oncology) is a medical accelerator facility for hadrontherapy of cancer at Hyogo Ion Beam Medical Center (HIBMC). Beam particles are proton (230 MeV) and carbon (320 MeV/u). After the beam commissioning and the tuning of irradiation system in 2000, we performed the clinical trials with proton and carbon beams from May 2001 until July 2002. We operated the accelerator for about 11,000 hours since the beginning of the beam tuning until the end of the clinical trials and for about 5,000 hours during the clinical trials. No serious troubles happened during the clinical trials. The stability and the reproducibility of the beams were well proved. (author)

  15. Space Station Environmental Control and Life Support System Test Facility at Marshall Space Flight Center

    Science.gov (United States)

    Springer, Darlene

    1989-01-01

    Different aspects of Space Station Environmental Control and Life Support System (ECLSS) testing are currently taking place at Marshall Space Flight Center (MSFC). Unique to this testing is the variety of test areas and the fact that all are located in one building. The north high bay of building 4755, the Core Module Integration Facility (CMIF), contains the following test areas: the Subsystem Test Area, the Comparative Test Area, the Process Material Management System (PMMS), the Core Module Simulator (CMS), the End-use Equipment Facility (EEF), and the Pre-development Operational System Test (POST) Area. This paper addresses the facility that supports these test areas and briefly describes the testing in each area. Future plans for the building and Space Station module configurations will also be discussed.

  16. Operational and Strategic Controlling Tools in Microenterprises - Case Study

    Science.gov (United States)

    Konsek-Ciechońska, Justyna

    2017-12-01

    Globalisation and increasing requirements of the environment cause the executives and supervisors to search for more and more perfect solutions, allowing them to streamline and improve the effectiveness of company operations. One of such tools, used more and more often, is controlling, the role of which has substantially increased in the recent years. It is already implemented not only in large companies with foreign capital, but also in increasingly smaller entities, which begin to notice the positive effects of the implications of the principles and tools of controlling - both operational and strategic. The purpose of the article is to demonstrate the practical side of controlling tools that can be used for the purposes of operations conducted by microenterprises.

  17. Evaluation of new control rooms by operator performance analysis

    International Nuclear Information System (INIS)

    Mori, M; Tomizawa, T.; Tai, I.; Monta, K.; Yoshimura, S.; Hattori, Y.

    1987-01-01

    An advanced supervisory and control system called PODIA TM (Plant Operation by Displayed Information and Automation) was developed by Toshiba. Since this system utilizes computer driven CRTs as a main device for information transfer to operators, thorough system integration tests were performed at the factory and evaluations were made of operators' assessment from the initial experience of the system. The PODIA system is currently installed at two BWR power plants. Based on the experiences from the development of PODIA, a more advanced man-machine interface, Advanced-PODIA (A-PODIA), is developed. A-PODIA enhances the capabilities of PODIA in automation, diagnosis, operational guidance and information display. A-PODIA has been validated by carrying out systematic experiments with a full-scope simulator developed for the validation. The results of the experiments have been analyzed by the method of operator performance analysis and applied to further improvement of the A-PODIA system. As a feedback from actual operational experience, operator performance data in simulator training is an important source of information to evaluate human factors of a control room. To facilitate analysis of operator performance, a performance evaluation system has been developed by applying AI techniques. The knowledge contained in the performance evaluation system was elicited from operator training experts and represented as rules. The rules were implemented by employing an object-oriented paradigm to facilitate knowledge management. In conclusion, it is stated that the feedback from new control room operation can be obtained at an early stage by validation tests and also continuously by comprehensive evaluation (with the help of automated tools) of operator performance in simulator training. The results of operator performance analysis can be utilized for improvement of system design as well as operator training. (author)

  18. Constrained model predictive control for load-following operation of APR reactors

    International Nuclear Information System (INIS)

    Kim, Jae Hwan; Lee, Sim Won; Kim, Ju Hyun; Na, Man Gyun; Yu, Keuk Jong; Kim, Han Gon

    2012-01-01

    The load-following operation of APR+ reactor is needed to control the power effectively using the control rods and to restrain the reactivity control from using the boric acid for flexibility of plant operation. Usually, the reason why the disproportion of axial flux distribution occurs during load-following operation is xenon-induced oscillation. The xenon has a very high absorption cross-section and makes the impact on the reactor delayed by the iodine precursor. The power maneuvering using automatically load-following operation has advantage in terms of safety and economic operation of the reactor, so the controller has to be designed efficiently. Therefore, an advanced control method that meets the conditions such as automatic control, flexibility, safety, and convenience is necessary to load-following operation of APR+ reactor. In this paper, the constrained model predictive control (MPC) method is applied to design APR reactor's automatic load-following controller for the integrated thermal power level and axial shape index (ASI) control. Some controllers use only the current tracking command, but MPC considers future commands in addition to the current tracking command. So, MPC can achieve better tracking performance than others. Furthermore, an MPC is to used in many industrial process control systems. The basic concept of the MPC is to solve an optimization problem for a finite future time interval at present time and to implement the first optimal control input as the current control input. The KISPAC-1D code, which models the APR+ nuclear power plants, is interfaced to the proposed controller to verify the tracking performance of the reactor power level and ASI. It is known that the proposed controller exhibits very fast tracking responses

  19. SSS-A attitude control prelaunch analysis and operations plan

    Science.gov (United States)

    Werking, R. D.; Beck, J.; Gardner, D.; Moyer, P.; Plett, M.

    1971-01-01

    A description of the attitude control support being supplied by the Mission and Data Operations Directorate is presented. Descriptions of the computer programs being used to support the mission for attitude determination, prediction, control, and definitive attitude processing are included. In addition, descriptions of the operating procedures which will be used to accomplish mission objectives are provided.

  20. Contextual control of discriminated operant behavior.

    Science.gov (United States)

    Bouton, Mark E; Todd, Travis P; León, Samuel P

    2014-01-01

    Previous research has suggested that changing the context after instrumental (operant) conditioning can weaken the strength of the operant response. That result contrasts with the results of studies of Pavlovian conditioning, in which a context switch often does not affect the response elicited by a conditioned stimulus. To begin to make the methods more similar, Experiments 1-3 tested the effects of a context switch in rats on a discriminated operant response (R; lever pressing or chain pulling) that had been reinforced only in the presence of a 30-s discriminative stimulus (S; tone or light). As in Pavlovian conditioning, responses and reinforcers became confined to presentations of the S during training. However, in Experiment 1, after training in Context A, a switch to Context B caused a decrement in responding during S. In Experiment 2, a switch to Context B likewise decreased responding in S when Context B was equally familiar, equally associated with reinforcement, or equally associated with the training of a discriminated operant (a different R reinforced in a different S). However, there was no decrement if Context B had been associated with the same response that was trained in Context A (Experiments 2 and 3). The effectiveness of S transferred across contexts, whereas the strength of the response did not. Experiment 4 found that a continuously reinforced response was also disrupted by context change when the same response manipulandum was used in both training and testing. Overall, the results suggest that the context can have a robust general role in the control of operant behavior. Mechanisms of contextual control are discussed.

  1. 21 CFR 111.65 - What are the requirements for quality control operations?

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 2 2010-04-01 2010-04-01 false What are the requirements for quality control... Process Control System § 111.65 What are the requirements for quality control operations? You must implement quality control operations in your manufacturing, packaging, labeling, and holding operations for...

  2. Management and Operational Control of Criticality

    Energy Technology Data Exchange (ETDEWEB)

    Daniels, J. T. [Authority Health and Safety Branch, United Kingdom Atomic Energy Authority, Risley, Lancs. (United Kingdom)

    1966-05-15

    The evidence of the six process criticality accidents that have been reported to date shows that, without exception, they have been due to the failure of operational controls. In no instance has a criticality accident in processing been due to the use of wrong data 01 inaccurate calculation. Criticality accidents are least likely to occur in the production stream and are more likely to be associated with ancillary equipment and operations. Important as correct criticality calculations are, there are many other considerations which require the exercise of judgement in establishing the operational environment. No operation involving fissile material should be permitted without a formal review resulting in a documented statement of (a) the environmental assessment, (b) the nuclear safety arguments which demonstrate safety under that environment, and (c) the operational requirements which will ensure the validity of (b) under the conditions of (a). To ensure the continued viability of the environmental assessment and the continued reliability of clearance conditions there should be close supervision by operating management, and periodic checks made by site nuclear safety staff. Additionally, there should be periodic and systematic examinations by competent persons who are not responsible to the overall management of the site. (author)

  3. Power control method for load-frequency control operation in BWRs

    International Nuclear Information System (INIS)

    Ie, Shin-ichiroo; Ohgo, Yu-kiharu; Itou, Tetsuo; Shida, Tooichi

    1991-01-01

    The preliminary design of an advanced power control method for fast load-following [load frequency control (LFC)] maneuvers in a boiling water reactor (BWR) is described in this paper. Application of a multivariable control method using an optimal linear quadratic (LQ) regulator theory effectively improves control system performance when system variables have significant interactions such as in BWRs. The control problem, however, demands strict constraints on system variable from the standpoint of plant operation. These constraints require the control system to have a nonlinear property for better improvement. Therefore, the effectiveness of LQ control is limited by these constraints, because it is based on a linear model. A new method is needed to compensate for the nonlinear property. In this study, the authors propose a new method using fuzzy reasoning with LQ control to achieve nonlinear compensation

  4. Optical and microwave control of germanium-vacancy center spins in diamond

    Science.gov (United States)

    Siyushev, Petr; Metsch, Mathias H.; Ijaz, Aroosa; Binder, Jan M.; Bhaskar, Mihir K.; Sukachev, Denis D.; Sipahigil, Alp; Evans, Ruffin E.; Nguyen, Christian T.; Lukin, Mikhail D.; Hemmer, Philip R.; Palyanov, Yuri N.; Kupriyanov, Igor N.; Borzdov, Yuri M.; Rogers, Lachlan J.; Jelezko, Fedor

    2017-08-01

    A solid-state system combining a stable spin degree of freedom with an efficient optical interface is highly desirable as an element for integrated quantum-optical and quantum-information systems. We demonstrate a bright color center in diamond with excellent optical properties and controllable electronic spin states. Specifically, we carry out detailed optical spectroscopy of a germanium-vacancy (GeV ) color center demonstrating optical spectral stability. Using an external magnetic field to lift the electronic spin degeneracy, we explore the spin degree of freedom as a controllable qubit. Spin polarization is achieved using optical pumping, and a spin relaxation time in excess of 20 μ s is demonstrated. We report resonant microwave control of spin transitions, and use this as a probe to measure the Autler-Townes effect in a microwave-optical double-resonance experiment. Superposition spin states were prepared using coherent population trapping, and a pure dephasing time of about 19 ns was observed at a temperature of 2.0 K.

  5. A work process and information flow description of control room operations

    International Nuclear Information System (INIS)

    Davey, E.; Matthews, G.

    2007-01-01

    The control room workplace is the location from which all plant operations are supervised and controlled on a shift-to-shift basis. The activities comprising plant operations are structured into a number of work processes, and information is the common currency that is used to convey work requirements, communicate business and operating decisions, specify work practice, and describe the ongoing plant and work status. This paper describes the motivation for and early experience with developing a work process and information flow model of CANDU control room operations, and discusses some of the insights developed from model examination that suggest ways in which changes in control centre work specification, organization of resources, or asset layout could be undertaken to achieve operational improvements. (author)

  6. Versatile cable handling mechanisms for remote operator control

    Energy Technology Data Exchange (ETDEWEB)

    Collie, A.A.; White, T.S.; Christopher, M.D.; Hewer, N.D. [Portech Ltd., Portsmouth (United Kingdom)

    1996-12-31

    This paper describes a system of cable management for keeping the umbilical cables of remote operating vehicles and manipulators tidy and contained without direct intervention by operators. Two distinct types of winding mechanism have been designed. One mechanism is a fixed reel type where the cable is wound onto the reel by a rotating bail arm. The other mechanism consists of a pair of curved belts held against each other between which cable is passed. The complete system includes tension measuring and slack loop take-up devices. The whole system is controlled by a servo system in conjunction with a PC based visual graphic environment which allows a variety of mechanisms to be built up into a system able to handle up to four umbilical cables simultaneously. The control system provides additional tension sensors and cable odometers connected to the control system so that the operator has immediate perception of all the cable parameters, and by defining rules, can set up a variety of alarm situations. (Author).

  7. Versatile cable handling mechanisms for remote operator control

    International Nuclear Information System (INIS)

    Collie, A.A.; White, T.S.; Christopher, M.D.; Hewer, N.D.

    1996-01-01

    This paper describes a system of cable management for keeping the umbilical cables of remote operating vehicles and manipulators tidy and contained without direct intervention by operators. Two distinct types of winding mechanism have been designed. One mechanism is a fixed reel type where the cable is wound onto the reel by a rotating bail arm. The other mechanism consists of a pair of curved belts held against each other between which cable is passed. The complete system includes tension measuring and slack loop take-up devices. The whole system is controlled by a servo system in conjunction with a PC based visual graphic environment which allows a variety of mechanisms to be built up into a system able to handle up to four umbilical cables simultaneously. The control system provides additional tension sensors and cable odometers connected to the control system so that the operator has immediate perception of all the cable parameters, and by defining rules, can set up a variety of alarm situations. (Author)

  8. Versatile cable handling mechanisms for remote operator control

    International Nuclear Information System (INIS)

    Collie, A.A.; White, T.S.; Christopher, M.D.; Hewer, N.D.

    1996-01-01

    This paper describes a system of cable management for keeping the umbilical cables of remote operating vehicles and manipulators tidy and contained without direct intervention by operators. Two distinct types of winding mechanism have been designed. One mechanism is a fixed reel type where the cable is wound onto the reel by a rotating bail arm. The other mechanism consists of a pair of curved belts held against each other, between which cable is passed. The complete system includes tension measuring and slack loop take-up devices. The whole system is controlled by a servo system in conjunction with a PC based visual graphic environment which allows a variety of mechanisms to be built up into a system able to handle up to four umbilical cables simultaneously. The control system provides additional tension sensors and cable odometers connected to the control system so that the operator has immediate perception of all the cable parameters, and by defining rules, can set up a variety of alarm situations. (UK)

  9. Advanced Stirling Convertor Dual Convertor Controller Testing at NASA Glenn Research Center in the Radioisotope Power Systems System Integration Laboratory

    Science.gov (United States)

    Dugala, Gina M.; Taylor, Linda M.; Bell, Mark E.; Dolce, James L.; Fraeman, Martin; Frankford, David P.

    2015-01-01

    NASA Glenn Research Center developed a nonnuclear representation of a Radioisotope Power System (RPS) consisting of a pair of Advanced Stirling Convertors (ASCs), Dual Convertor Controller (DCC) EMs (engineering models) 2 and 3, and associated support equipment, which were tested in the Radioisotope Power Systems System Integration Laboratory (RSIL). The DCC was designed by the Johns Hopkins University Applied Physics Laboratory (JHU/APL) to actively control a pair of ASCs. The first phase of testing included a Dual Advanced Stirling Convertor Simulator (DASCS), which was developed by JHU/APL and simulates the operation and electrical behavior of a pair of ASCs in real time via a combination of hardware and software. RSIL provides insight into the electrical interactions between a representative radioisotope power generator, its associated control schemes, and realistic electric system loads. The first phase of integration testing included the following spacecraft bus configurations: capacitive, battery, and super-capacitor. A load profile, created based on data from several missions, tested the RPS's and RSIL's ability to maintain operation during load demands above and below the power provided by the RPS. The integration testing also confirmed the DCC's ability to disconnect from the spacecraft when the bus voltage dipped below 22 volts or exceeded 36 volts. Once operation was verified with the DASCS, the tests were repeated with actual operating ASCs. The goal of this integration testing was to verify operation of the DCC when connected to a spacecraft and to verify the functionality of the newly designed RSIL. The results of these tests are presented in this paper.

  10. Optimal Operation of Data Centers in Future Smart Grid

    Science.gov (United States)

    Ghamkhari, Seyed Mahdi

    The emergence of cloud computing has established a growing trend towards building massive, energy-hungry, and geographically distributed data centers. Due to their enormous energy consumption, data centers are expected to have major impact on the electric grid by significantly increasing the load at locations where they are built. However, data centers also provide opportunities to help the grid with respect to robustness and load balancing. For instance, as data centers are major and yet flexible electric loads, they can be proper candidates to offer ancillary services, such as voluntary load reduction, to the smart grid. Also, data centers may better stabilize the price of energy in the electricity markets, and at the same time reduce their electricity cost by exploiting the diversity in the price of electricity in the day-ahead and real-time electricity markets. In this thesis, such potentials are investigated within an analytical profit maximization framework by developing new mathematical models based on queuing theory. The proposed models capture the trade-off between quality-of-service and power consumption in data centers. They are not only accurate, but also they posses convexity characteristics that facilitate joint optimization of data centers' service rates, demand levels and demand bids to different electricity markets. The analysis is further expanded to also develop a unified comprehensive energy portfolio optimization for data centers in the future smart grid. Specifically, it is shown how utilizing one energy option may affect selecting other energy options that are available to a data center. For example, we will show that the use of on-site storage and the deployment of geographical workload distribution can particularly help data centers in utilizing high-risk energy options such as renewable generation. The analytical approach in this thesis takes into account service-level-agreements, risk management constraints, and also the statistical

  11. Aspects of computer control from the human engineering standpoint

    International Nuclear Information System (INIS)

    Huang, T.V.

    1979-03-01

    A Computer Control System includes data acquisition, information display and output control signals. In order to design such a system effectively we must first determine the required operational mode: automatic control (closed loop), computer assisted (open loop), or hybrid control. The choice of operating mode will depend on the nature of the plant, the complexity of the operation, the funds available, and the technical expertise of the operating staff, among many other factors. Once the mode has been selected, consideration must be given to the method (man/machine interface) by which the operator interacts with this system. The human engineering factors are of prime importance to achieving high operating efficiency and very careful attention must be given to this aspect of the work, if full operator acceptance is to be achieved. This paper will discuss these topics and will draw on experience gained in setting up the computer control system in Main Control Center for Stanford University's Accelerator Center (a high energy physics research facility)

  12. 14 CFR 27.695 - Power boost and power-operated control system.

    Science.gov (United States)

    2010-01-01

    ... Systems § 27.695 Power boost and power-operated control system. (a) If a power boost or power-operated... failure of all engines. (b) Each alternate system may be a duplicate power portion or a manually operated... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Power boost and power-operated control...

  13. 14 CFR 29.695 - Power boost and power-operated control system.

    Science.gov (United States)

    2010-01-01

    ... Systems § 29.695 Power boost and power-operated control system. (a) If a power boost or power-operated... failure of all engines. (b) Each alternate system may be a duplicate power portion or a manually operated... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Power boost and power-operated control...

  14. Data Center Equipment Location and Monitoring System

    DEFF Research Database (Denmark)

    2013-01-01

    Abstract: Data center equipment location systems include hardware and software to provide information on the location, monitoring, and security of servers and other equipment in equipment racks. The systems provide a wired alternative to the wireless RFID tag system by using electronic ID tags...... connected to each piece of equipment, each electronic ID tag connected directly by wires to an equipment rack controller on the equipment rack. The equipment rack controllers link to a central control computer that provides an operator ...

  15. Control and operation cost optimization of the HISS cryogenic system

    International Nuclear Information System (INIS)

    Porter, J.; Anderson, D.; Bieser, F.

    1984-01-01

    This chapter describes a control strategy for the Heavy Ion Spectrometer System (HISS), which relies upon superconducting coils of cryostable design to provide a particle bending field of 3 tesla. The control strategy has allowed full time unattended operation and significant operating cost reductions. Microprocessor control of flash boiling style LIN circuits has been successful. It is determined that the overall operating cost of most cryogenic systems using closed loop helium systems can be minimized by properly balancing the total heat load between the helium and nitrogen circuits to take advantage of the non-linearity which exists in the power input to 4K refrigeration characteristic. Variable throughput compressors have the advantage of turndown capability at steady state. It is concluded that a hybrid system using digital and analog input for control, data display and alarms enables full time unattended operation

  16. Status of the TESS Science Processing Operations Center

    Science.gov (United States)

    Jenkins, Jon Michael; Caldwell, Douglas A.; Davies, Misty; Li, Jie; Morris, Robert L.; Rose, Mark; Smith, Jeffrey C.; Tenenbaum, Peter; Ting, Eric; Twicken, Joseph D.; Wohler, Bill

    2018-06-01

    The Transiting Exoplanet Survey Satellite (TESS) was selected by NASA’s Explorer Program to conduct a search for Earth’s closest cousins starting in 2018. TESS will conduct an all-sky transit survey of F, G and K dwarf stars between 4 and 12 magnitudes and M dwarf stars within 200 light years. TESS is expected to discover 1,000 small planets less than twice the size of Earth, and to measure the masses of at least 50 of these small worlds. The TESS science pipeline is being developed by the Science Processing Operations Center (SPOC) at NASA Ames Research Center based on the highly successful Kepler science pipeline. Like the Kepler pipeline, the TESS pipeline provides calibrated pixels, simple and systematic error-corrected aperture photometry, and centroid locations for all 200,000+ target stars observed over the 2-year mission, along with associated uncertainties. The pixel and light curve products are modeled on the Kepler archive products and will be archived to the Mikulski Archive for Space Telescopes (MAST). In addition to the nominal science data, the 30-minute Full Frame Images (FFIs) simultaneously collected by TESS will also be calibrated by the SPOC and archived at MAST. The TESS pipeline searches through all light curves for evidence of transits that occur when a planet crosses the disk of its host star. The Data Validation pipeline generates a suite of diagnostic metrics for each transit-like signature, and then extracts planetary parameters by fitting a limb-darkened transit model to each potential planetary signature. The results of the transit search are modeled on the Kepler transit search products (tabulated numerical results, time series products, and pdf reports) all of which will be archived to MAST. Synthetic sample data products are available at https://archive.stsci.edu/tess/ete-6.html.Funding for the TESS Mission has been provided by the NASA Science Mission Directorate.

  17. The Research-to-Operations-to-Research Cycle at NOAA's Space Weather Prediction Center

    Science.gov (United States)

    Singer, H. J.

    2017-12-01

    The provision of actionable space weather products and services by NOAA's Space Weather Prediction Center relies on observations, models and scientific understanding of our dynamic space environment. It also depends on a deep understanding of the systems and capabilities that are vulnerable to space weather, as well as national and international partnerships that bring together resources, skills and applications to support space weather forecasters and customers. While these activities have been evolving over many years, in October 2015, with the release of the National Space Weather Strategy and National Space Weather Action Plan (NSWAP) by National Science and Technology Council in the Executive Office of the President, there is a new coordinated focus on ensuring the Nation is prepared to respond to and recover from severe space weather storms. One activity highlighted in the NSWAP is the Operations to Research (O2R) and Research to Operations (R2O) process. In this presentation we will focus on current R2O and O2R activities that advance our ability to serve those affected by space weather and give a vision for future programs. We will also provide examples of recent research results that lead to improved operational capabilities, lessons learned in the transition of research to operations, and challenges for both the science and operations communities.

  18. Work plan for upgrading the 241-A-701 compressed air system and motor control center. Revision 1

    International Nuclear Information System (INIS)

    Carpenter, K.E.

    1995-01-01

    This work plan will outline the responsibilities associated with the 241-A-701 Compressed Air System (CAS) and Motor Control Center (MCC) upgrades. All activities required to design, install, test, and operate the modified systems are addressed in this document. Upgrades Technical Support (UTS) of TWRS Engineering is responsible for the completion of all tasks associated with this upgrade. UTS will coordinate the upgrade activities, and ensure all tasks are successfully completed on or before the scheduled dates. The primary objective of the 241-A-701 Compressor and MCC Upgrade is to provide a reliable source of process and instrument compressed air to the A, AX, AY, and AZ tank farms

  19. Future control room design (modernization of control room systems)

    International Nuclear Information System (INIS)

    Reischl, Ludwig; Freitag, Timo; Dergel, Rene

    2009-01-01

    In the frame of lifetime extension for nuclear power plants the modernization of the complete safety and operational control technology will be digitalized. It is also recommended to modernize the operator facilities, monitoring systems in the control room, the back-up shut-down center and the local control stations. The authors summarize the reasons for the modernization recommendations and discuss possible solutions for display-oriented control rooms. A concept for control room backfitting includes generic requirements, requirements of the local authorities, ergonomic principles information content and information density, and the design process. The backfitting strategy should include a cooperation with the operational personnel, The quality assurance and training via simulator needs sufficient timing during the implementation of the backfitting.

  20. Operation control device for a nuclear reactor fuel exchanger

    International Nuclear Information System (INIS)

    Aida, Takashi.

    1984-01-01

    Purpose: To provide a operation control device for a nuclear reactor fuel exchanger with reduced size and weight capable of optionally meeting the complicated and versatile mode of the operation scope. Constitution: The operation range of a fuel exchanger is finely divided so as to attain the state capable of discriminating between operation-allowable range and operation-inhibitive range, which are stored in a memory circuit. Upon operating the fuel exchanger, the position is detected and a divided range data corresponding to the present position is taken out from the memory circuit so as to determine whether the fuel exchanger is to be run or stopped. Use of reduced size and compact IC circuits (calculation circuit, memory circuit, data latch circuit) and input/output interface circuits or the likes contributes to the size reduction of the exchanger control system to enlarge the floor maintenance space. (Moriyama, K.)

  1. Electric Power Research Institute, Environmental Control Technology Center report to the steering committee. Final technical report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-12-01

    Operations and maintenance continued this month at the Electric Power Research Institute`s Environmental Control Technology Center. Testing on the 4.0 MW Pilot Wet FGD unit continued with the Pilot High Velocity FGD (PHV) and the Trace Element Removal (TER) test blocks. In the High Velocity test block, SO{sub 2} removal and mist eliminator carryover rates were investigated while operating the absorber unit with various spray nozzle types and vertical mist eliminator sections. During the Trace Element Removal test block, the mercury measurements and control studies involving the EPA Method 29 continued with testing of several impinger capture solutions, and the use of activated carbon injection across the Pulse-Jet Fabric Filter (PJFF) unit. The 4.0 MW Spray Dryer Absorber System was utilized this month in the TER test configuration to inject and transfer activated carbon to the PJFF bags for downstream mercury capture. Work also began in December to prepare the 0.4 MW Mini-Pilot Absorber system for receipt of the B and W Condensing Heat Exchanger (CHX) unit to be used in the 1996 DOE/PRDA testing. The 1.0 MW Cold-Side Selective Catalytic Reduction (SCR) unit remained in cold-standby this month.

  2. Development of ITER CODAC compatible gyrotron local control system and its operation

    International Nuclear Information System (INIS)

    Ohshima, Katsumi; Oda, Yasuhisa; Takahashi, Koji; Terakado, Masayuki; Ikeda, Ryosuke; Moriyama, Shinichi; Kajiwara, Ken; Sakamoto, Keishi; Hayashi, Kazuo

    2016-03-01

    In Japan Atomic Energy Agency, an ITER relevant control system for ITER gyrotron was developed according to Plant Control Design Handbook. This control system was developed based on ITER CODAC Core System and implemented state machine control of gyrotron operation system, sequential timing control of gyrotron oscillation startup, and data acquisition. The operation of ITER 170 GHz gyrotron was demonstrated with ITER relevant power supply configuration. This system is utilized for gyrotron operation test for ITER procurement. This report describes the architecture of gyrotron local control system, its basic and detailed design, and recent operation results. (author)

  3. Test, Control and Monitor System (TCMS) operations plan

    Science.gov (United States)

    Macfarlane, C. K.; Conroy, M. P.

    1993-01-01

    The purpose is to provide a clear understanding of the Test, Control and Monitor System (TCMS) operating environment and to describe the method of operations for TCMS. TCMS is a complex and sophisticated checkout system focused on support of the Space Station Freedom Program (SSFP) and related activities. An understanding of the TCMS operating environment is provided and operational responsibilities are defined. NASA and the Payload Ground Operations Contractor (PGOC) will use it as a guide to manage the operation of the TCMS computer systems and associated networks and workstations. All TCMS operational functions are examined. Other plans and detailed operating procedures relating to an individual operational function are referenced within this plan. This plan augments existing Technical Support Management Directives (TSMD's), Standard Practices, and other management documentation which will be followed where applicable.

  4. Standard formatted data units-control authority operations

    Science.gov (United States)

    1991-01-01

    The purpose of this document is to illustrate a Control Authority's (CA) possible operation. The document is an interpretation and expansion of the concept found in the CA Procedures Recommendation. The CA is described in terms of the functions it performs for the management and control of data descriptions (metadata). Functions pertaining to the organization of Member Agency Control Authority Offices (MACAOs) (e.g., creating and disbanding) are not discussed. The document also provides an illustrative operational view of a CA through scenarios describing interaction between those roles involved in collecting, controlling, and accessing registered metadata. The roles interacting with the CA are identified by their actions in requesting and responding to requests for metadata, and by the type of information exchanged. The scenarios and examples presented in this document are illustrative only. They represent possible interactions supported by either a manual or automated system. These scenarios identify requirements for an automated system. These requirements are expressed by identifying the information to be exchanged and the services that may be provided by a CA for that exchange.

  5. Size-controlled fluorescent nanodiamonds: A facile method of fabrication and color-center counting

    KAUST Repository

    Mahfouz, Remi

    2013-01-01

    We present a facile method for the production of fluorescent diamond nanocrystals (DNCs) of different sizes and efficiently quantify the concentration of emitting defect color centers (DCCs) of each DNC size. We prepared the DNCs by ball-milling commercially available micrometer-sized synthetic (high pressure, high temperature (HPHT)) diamonds and then separated the as-produced DNCs by density gradient ultracentrifugation (DGU) into size-controlled fractions. A protocol to enhance the uniformity of the nitrogen-vacancy (NV) centers in the diamonds was devised by depositing the DNCs as a dense monolayer on amino-silanized silicon substrates and then subjecting the monolayer to He+ beam irradiation. Using a standard confocal setup, we analyzed the average number of NV centers per crystal, and obtained a quantitative relationship between the DNC particle size and the NV number per crystal. This relationship was in good agreement with results from previous studies that used more elaborate setups. Our findings suggest that nanocrystal size separation by DGU may be used to control the number of defects per nanocrystal. The efficient approaches described herein to control and quantify DCCs are valuable to researchers as they explore applications for color centers and new strategies to create them. © 2013 The Royal Society of Chemistry.

  6. Mission control team structure and operational lessons learned from the 2009 and 2010 NASA desert RATS simulated lunar exploration field tests

    Science.gov (United States)

    Bell, Ernest R.; Badillo, Victor; Coan, David; Johnson, Kieth; Ney, Zane; Rosenbaum, Megan; Smart, Tifanie; Stone, Jeffry; Stueber, Ronald; Welsh, Daren; Guirgis, Peggy; Looper, Chris; McDaniel, Randall

    2013-10-01

    team the opportunity to gain insight into functional hardware requirements via lessons learned from executing the Desert RATS field test missions. This paper will detail the mission control team structure that was used during the 2009 and 2010 Desert RATS Lunar analog missions. It will also present a number of the lessons learned by the operations team during these field tests. Major lessons learned involved Mission Control Center (MCC) operations, pre-mission planning and training processes, procedure requirements, communication requirements, and logistic support for analogs. This knowledge will be applied to future Desert RATS field tests, and other Earth based analog testing for space exploration, to continue the evolution of manned space operations in preparation for human planetary exploration. It is important that operational knowledge for human space exploration missions be obtained during Earth-bound field tests to the greatest extent possible. This allows operations personnel the ability to examine various flight control and crew operations scenarios in preparation for actual space missions.

  7. Sixth NASA Glenn Research Center Propulsion Control and Diagnostics (PCD) Workshop

    Science.gov (United States)

    Litt, Jonathan S. (Compiler)

    2018-01-01

    The Intelligent Control and Autonomy Branch at NASA Glenn Research Center hosted the Sixth Propulsion Control and Diagnostics Workshop on August 22-24, 2017. The objectives of this workshop were to disseminate information about research being performed in support of NASA Aeronautics programs; get feedback from peers on the research; and identify opportunities for collaboration. There were presentations and posters by NASA researchers, Department of Defense representatives, and engine manufacturers on aspects of turbine engine modeling, control, and diagnostics.

  8. Distribution electric system simulator to support decision-making for CFE (Federal Electric Commission) Distribution Control Centers; Simulador del Sistema Electrico de Distribucion para apoyo en la toma de decisiones en Centros de Control de Distribucion de la CFE

    Energy Technology Data Exchange (ETDEWEB)

    Espinosa Reza, Alfredo; Quintero Reyes, Agustin; Garcia Mendoza, Raul; Calleros Torres, Tito Manuel [Instituto de Investigaciones Electricas, Cuernavaca, Morelos (Mexico); Borjas Diaz, Jesus Fidel; Sierra Rodriguez, Benjamin; Torres Abrego, Rafael [Comision Federal de Electricidad (Mexico)

    2011-07-01

    This article presents the physical, logical and functional architecture designed to integrate the Electric Distribution System (EDS) simulator developed for the CFE and the electric energy Distribution Control Centers in Mexico. The objective of the EDS simulator is to integrate engineering distribution functions (power flow, short circuit, optimal reconfiguration and reliability, among others) and an expert system (Case-based Reasoning) to aid the process of information analysis, decision-making and the capacity-building of the CFE's Regional and Zonal Distribution Control Centers. The EDS simulator has been installed, updated and is operational in the Tampico Zone and the Gulf Division Distribution Center, as an established product that continually evolves along with the actual operating dynamics. [Spanish] Se presenta la arquitectura fisica, logica y funcional disenada para integrar el simulador del Sistema Electrico de Distribucion (SED) desarrollado para la Comision Federal de Electricidad (CFE) y los Centros de Control de Distribucion de energia electrica en Mexico. El objetivo del simulador del SED es integrar funciones de ingenieria de distribucion (flujo de potencia, corto circuito, reconfiguracion optima, confiabilidad, entre otras) y un sistema experto (Razonamiento Basado en Casos) para apoyar el proceso de analisis de informacion, la toma de decisiones y la capacitacion en los Centros de Control de Distribucion Zonales y Regionales de CFE. El Simulador del SED se encuentra instalado, actualizado y en operacion en la Zona Tampico y en la Division de Distribucion Golfo Centro como un producto consolidado y en constante evolucion a la par de la dinamica operativa real.

  9. Control of hybrid AC/DC microgrid under islanding operational conditions

    DEFF Research Database (Denmark)

    Ding, G.; Gao, F.; Zhang, S.

    2014-01-01

    This paper presents control methods for hybrid AC/DC microgrid under islanding operation condition. The control schemes for AC sub-microgrid and DC sub-microgrid are investigated according to the power sharing requirement and operational reliability. In addition, the key control schemes...... of interlinking converter with DC-link capacitor or energy storage, which will devote to the proper power sharing between AC and DC sub-microgrids to maintain AC and DC side voltage stable, is reviewed. Combining the specific control methods developed for AC and DC sub-microgrids with interlinking converter......, the whole hybrid AC/DC microgrid can manage the power flow transferred between sub-microgrids for improving on the operational quality and efficiency....

  10. Cost Analysis In A Multi-Mission Operations Environment

    Science.gov (United States)

    Newhouse, M.; Felton, L.; Bornas, N.; Botts, D.; Roth, K.; Ijames, G.; Montgomery, P.

    2014-01-01

    Spacecraft control centers have evolved from dedicated, single-mission or single missiontype support to multi-mission, service-oriented support for operating a variety of mission types. At the same time, available money for projects is shrinking and competition for new missions is increasing. These factors drive the need for an accurate and flexible model to support estimating service costs for new or extended missions; the cost model in turn drives the need for an accurate and efficient approach to service cost analysis. The National Aeronautics and Space Administration (NASA) Huntsville Operations Support Center (HOSC) at Marshall Space Flight Center (MSFC) provides operations services to a variety of customers around the world. HOSC customers range from launch vehicle test flights; to International Space Station (ISS) payloads; to small, short duration missions; and has included long duration flagship missions. The HOSC recently completed a detailed analysis of service costs as part of the development of a complete service cost model. The cost analysis process required the team to address a number of issues. One of the primary issues involves the difficulty of reverse engineering individual mission costs in a highly efficient multimission environment, along with a related issue of the value of detailed metrics or data to the cost model versus the cost of obtaining accurate data. Another concern is the difficulty of balancing costs between missions of different types and size and extrapolating costs to different mission types. The cost analysis also had to address issues relating to providing shared, cloud-like services in a government environment, and then assigning an uncertainty or risk factor to cost estimates that are based on current technology, but will be executed using future technology. Finally the cost analysis needed to consider how to validate the resulting cost models taking into account the non-homogeneous nature of the available cost data and the

  11. The Joint Space Operations Center (JSpOC) Mission System (JMS) and the Advanced Research, Collaboration, and Application Development Environment (ARCADE)

    Science.gov (United States)

    Johnson, K.; Kim, R.; Echeverry, J.

    The Joint Space Operations Center (JSpOC) is a command and control center focused on executing the Space Control mission of the Joint Functional Component Command for Space (JFCC-SPACE) to ensure freedom of action of United States (US) space assets, while preventing adversary use of space against the US. To accomplish this, the JSpOC tasks a network of space surveillance sensors to collect Space Situational Awareness (SSA) data on resident space objects (RSOs) in near earth and deep space orbits. SSA involves the ingestion of data sources and use of algorithms and tools to build, maintain, and disseminate situational awareness of RSOs in space. On the heels of emergent and complex threats to space assets, the JSpOC's capabilities are limited by legacy systems and CONOPs. The JSpOC Mission System (JMS) aims to consolidate SSA efforts across US agencies, international partners, and commercial partners. The JMS program is intended to deliver a modern service-oriented architecture (SOA) based infrastructure with increased process automation and improved tools to remove the current barriers to JSpOC operations. JMS has been partitioned into several developmental increments. Increment 1, completed and operational in early 2013, and Increment 2, which is expected to be completed in 2016, will replace the legacy Space Defense Operations Center (SPADOC) and Astrodynamics Support Workstation (ASW) capabilities. In 2017 JMS Increment 3 will continue to provide additional SSA and C2 capabilities that will require development of new applications and procedures as well as the exploitation of new data sources. Most importantly, Increment 3 is uniquely postured to evolve the JSpOC into the centralized and authoritative source for all Space Control applications by using its SOA to aggregate information and capabilities from across the community. To achieve this goal, Scitor Corporation has supported the JMS Program Office as it has entered into a partnership with AFRL/RD (Directed

  12. Nuclear electric power safety, operation, and control aspects

    CERN Document Server

    Knowles, J Brian

    2013-01-01

    Assesses the engineering of renewable sources for commercial power generation and discusses the safety, operation, and control aspects of nuclear electric power From an expert who advised the European Commission and UK government in the aftermath of Three Mile Island and Chernobyl comes a book that contains experienced engineering assessments of the options for replacing the existing, aged, fossil-fired power stations with renewable, gas-fired, or nuclear plants. From geothermal, solar, and wind to tidal and hydro generation, Nuclear Electric Power: Safety, Operation, and Control Aspects ass

  13. Fail-safe computer-aided operations control system for the transrapid maglev high-speed railway

    Energy Technology Data Exchange (ETDEWEB)

    Burkert, S [Siemens AG, Braunschweig (Germany); Eilers, H [Siemens AG, Braunschweig (Germany); Freitag, V [Siemens AG, Braunschweig (Germany); Knigge, R [Siemens AG, Braunschweig (Germany)

    1996-12-31

    The wide variety of control and safety functions for the Transrapid need to be interlinked in the operations control system. These functions are grouped according to their main focus and located in the subsystems `operations control centre`, `decentralised operations control system` and `on-board operations control system`. The paper describes the operations control system OCS. (HW)

  14. Operational test procedure for pumping and instrumentation control skid SALW-6001B monitor and control system

    International Nuclear Information System (INIS)

    Garcia, M.F.

    1995-11-01

    This OTP shall verify and document that the monitor and control system comprised of PICS SALW-6001B PLC, 242S PLC, Operator Control Station, and communication network is functioning per operational requirements

  15. Operational Assessment of Controller Complexity, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — In today's operations, acceptable levels of controller workload are maintained by assigning sector capacities based on simple aircraft count and a capacity threshold...

  16. Centralised process control of the metallurgical operation at Roessing, South West Africa/Namibia

    International Nuclear Information System (INIS)

    Thomas, R.; Erlank, B.

    1987-01-01

    A Honeywell TDC 2000 central process control system was installed at Roessing in 1984. The system controls the metallurgical operations from crushing to the finished product of uranium oxide and manufacture of sulphuric acid. The operation was previously controlled from nine separate local control rooms. The paper briefly reviews the design and commissioning of the control system on an operating plant and discusses the impact on manpower organisation and training needs. Development of the process control system during its first two years of operation is reviewed and a summary is given of the current status of computer control at Roessing. The impact of the new system on overall plant operation and performance efficiency is also briefly described. In conclusion, future developments of computer control and overall optimisation of metallurgical operations are reviewed

  17. System for controlling the operating temperature of a fuel cell

    Science.gov (United States)

    Fabis, Thomas R.; Makiel, Joseph M.; Veyo, Stephen E.

    2006-06-06

    A method and system are provided for improved control of the operating temperature of a fuel cell (32) utilizing an improved temperature control system (30) that varies the flow rate of inlet air entering the fuel cell (32) in response to changes in the operating temperature of the fuel cell (32). Consistent with the invention an improved temperature control system (30) is provided that includes a controller (37) that receives an indication of the temperature of the inlet air from a temperature sensor (39) and varies the heat output by at least one heat source (34, 36) to maintain the temperature of the inlet air at a set-point T.sub.inset. The controller (37) also receives an indication of the operating temperature of the fuel cell (32) and varies the flow output by an adjustable air mover (33), within a predetermined range around a set-point F.sub.set, in order to maintain the operating temperature of the fuel cell (32) at a set-point T.sub.opset.

  18. Implementing multidisciplinary research center infrastructure - A trendsetting example: SUNUM

    OpenAIRE

    Birkan, Burak; Özgüz, Volkan Hüsnü; Ozguz, Volkan Husnu

    2014-01-01

    Sabanci University Nanotechnology Research and Application Center (SUNUM) became operational in January 2012. SUNUM is a trendsetting example of a green and flexible research facility that is a test bed for the cost-effective operation of a Centralized Demand-Controlled Ventilation (CDCV) system, a state-of-the-art cleanroom, and world-class high technology equipment. The total investment in the facility was US$35 million.

  19. Field Operations and Enforcement Manual for Air Pollution Control. Volume II: Control Technology and General Source Inspection.

    Science.gov (United States)

    Weisburd, Melvin I.

    The Field Operations and Enforcement Manual for Air Pollution Control, Volume II, explains in detail the following: technology of source control, modification of operations, particulate control equipment, sulfur dioxide removal systems for power plants, and control equipment for gases and vapors; inspection procedures for general sources, fuel…

  20. Quantum circuits cannot control unknown operations

    International Nuclear Information System (INIS)

    Araújo, Mateus; Feix, Adrien; Costa, Fabio; Brukner, Časlav

    2014-01-01

    One of the essential building blocks of classical computer programs is the ‘if’ clause, which executes a subroutine depending on the value of a control variable. Similarly, several quantum algorithms rely on applying a unitary operation conditioned on the state of a control system. Here we show that this control cannot be performed by a quantum circuit if the unitary is completely unknown. The task remains impossible even if we allow the control to be done modulo a global phase. However, this no-go theorem does not prevent implementing quantum control of unknown unitaries in practice, as any physical implementation of an unknown unitary provides additional information that makes the control possible. We then argue that one should extend the quantum circuit formalism to capture this possibility in a straightforward way. This is done by allowing unknown unitaries to be applied to subspaces and not only to subsystems. (paper)

  1. Towards more stable operation of the Tokyo Tier2 center

    Science.gov (United States)

    Nakamura, T.; Mashimo, T.; Matsui, N.; Sakamoto, H.; Ueda, I.

    2014-06-01

    The Tokyo Tier2 center, which is located at the International Center for Elementary Particle Physics (ICEPP) in the University of Tokyo, was established as a regional analysis center in Japan for the ATLAS experiment. The official operation with WLCG was started in 2007 after the several years development since 2002. In December 2012, we have replaced almost all hardware as the third system upgrade to deal with analysis for further growing data of the ATLAS experiment. The number of CPU cores are increased by factor of two (9984 cores in total), and the performance of individual CPU core is improved by 20% according to the HEPSPEC06 benchmark test at 32bit compile mode. The score is estimated as 18.03 (SL6) per core by using Intel Xeon E5-2680 2.70 GHz. Since all worker nodes are made by 16 CPU cores configuration, we deployed 624 blade servers in total. They are connected to 6.7 PB of disk storage system with non-blocking 10 Gbps internal network backbone by using two center network switches (NetIron MLXe-32). The disk storage is made by 102 of RAID6 disk arrays (Infortrend DS S24F-G2840-4C16DO0) and served by equivalent number of 1U file servers with 8G-FC connection to maximize the file transfer throughput per storage capacity. As of February 2013, 2560 CPU cores and 2.00 PB of disk storage have already been deployed for WLCG. Currently, the remaining non-grid resources for both CPUs and disk storage are used as dedicated resources for the data analysis by the ATLAS Japan collaborators. Since all hardware in the non-grid resources are made by same architecture with Tier2 resource, they will be able to be migrated as the Tier2 extra resource on demand of the ATLAS experiment in the future. In addition to the upgrade of computing resources, we expect the improvement of connectivity on the wide area network. Thanks to the Japanese NREN (NII), another 10 Gbps trans-Pacific line from Japan to Washington will be available additionally with existing two 10 Gbps lines

  2. Towards more stable operation of the Tokyo Tier2 center

    International Nuclear Information System (INIS)

    Nakamura, T; Mashimo, T; Matsui, N; Sakamoto, H; Ueda, I

    2014-01-01

    The Tokyo Tier2 center, which is located at the International Center for Elementary Particle Physics (ICEPP) in the University of Tokyo, was established as a regional analysis center in Japan for the ATLAS experiment. The official operation with WLCG was started in 2007 after the several years development since 2002. In December 2012, we have replaced almost all hardware as the third system upgrade to deal with analysis for further growing data of the ATLAS experiment. The number of CPU cores are increased by factor of two (9984 cores in total), and the performance of individual CPU core is improved by 20% according to the HEPSPEC06 benchmark test at 32bit compile mode. The score is estimated as 18.03 (SL6) per core by using Intel Xeon E5-2680 2.70 GHz. Since all worker nodes are made by 16 CPU cores configuration, we deployed 624 blade servers in total. They are connected to 6.7 PB of disk storage system with non-blocking 10 Gbps internal network backbone by using two center network switches (NetIron MLXe-32). The disk storage is made by 102 of RAID6 disk arrays (Infortrend DS S24F-G2840-4C16DO0) and served by equivalent number of 1U file servers with 8G-FC connection to maximize the file transfer throughput per storage capacity. As of February 2013, 2560 CPU cores and 2.00 PB of disk storage have already been deployed for WLCG. Currently, the remaining non-grid resources for both CPUs and disk storage are used as dedicated resources for the data analysis by the ATLAS Japan collaborators. Since all hardware in the non-grid resources are made by same architecture with Tier2 resource, they will be able to be migrated as the Tier2 extra resource on demand of the ATLAS experiment in the future. In addition to the upgrade of computing resources, we expect the improvement of connectivity on the wide area network. Thanks to the Japanese NREN (NII), another 10 Gbps trans-Pacific line from Japan to Washington will be available additionally with existing two 10 Gbps lines

  3. Supervisory Control and Diagnostics System Distributed Operating System

    International Nuclear Information System (INIS)

    McGoldrick, P.R.

    1979-01-01

    This paper contains a description of the Supervisory Control and Diagnostics System (SCDS) Distributed Operating System. The SCDS consists of nine 32-bit minicomputers with shared memory. The system's main purpose is to control a large Mirror Fusion Test Facility

  4. Department of Energy’s ARM Climate Research Facility External Data Center Operations Plan Located At Brookhaven National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Cialella, A. [Brookhaven National Lab. (BNL), Upton, NY (United States); Gregory, L. [Brookhaven National Lab. (BNL), Upton, NY (United States); Lazar, K. [Brookhaven National Lab. (BNL), Upton, NY (United States); Liang, M. [Brookhaven National Lab. (BNL), Upton, NY (United States); Ma, L. [Brookhaven National Lab. (BNL), Upton, NY (United States); Tilp, A. [Brookhaven National Lab. (BNL), Upton, NY (United States); Wagener, R. [Brookhaven National Lab. (BNL), Upton, NY (United States)

    2015-05-01

    The External Data Center (XDC) Operations Plan describes the activities performed to manage the XDC, located at Brookhaven National Laboratory (BNL), for the Department of Energy’s Atmospheric Radiation Measurement (ARM) Climate Research Facility. It includes all ARM infrastructure activities performed by the Data Management and Software Engineering Group (DMSE) at BNL. This plan establishes a baseline of expectation within the ARM Operations Management for the group managing the XDC.

  5. Use of the Human Centered Design concept when designing ergonomic NPP control rooms

    International Nuclear Information System (INIS)

    Skrehot, Petr A.; Houser, Frantisek; Riha, Radek; Tuma, Zdenek

    2015-01-01

    Human-Centered Design is a concept aimed at reconciling human needs on the one hand and limitations posed by the design disposition of the room being designed on the other hand. This paper describes the main aspects of application of the Human-Centered Design concept to the design of nuclear power plant control rooms. (orig.)

  6. The Neural-fuzzy Thermal Error Compensation Controller on CNC Machining Center

    Science.gov (United States)

    Tseng, Pai-Chung; Chen, Shen-Len

    The geometric errors and structural thermal deformation are factors that influence the machining accuracy of Computer Numerical Control (CNC) machining center. Therefore, researchers pay attention to thermal error compensation technologies on CNC machine tools. Some real-time error compensation techniques have been successfully demonstrated in both laboratories and industrial sites. The compensation results still need to be enhanced. In this research, the neural-fuzzy theory has been conducted to derive a thermal prediction model. An IC-type thermometer has been used to detect the heat sources temperature variation. The thermal drifts are online measured by a touch-triggered probe with a standard bar. A thermal prediction model is then derived by neural-fuzzy theory based on the temperature variation and the thermal drifts. A Graphic User Interface (GUI) system is also built to conduct the user friendly operation interface with Insprise C++ Builder. The experimental results show that the thermal prediction model developed by neural-fuzzy theory methodology can improve machining accuracy from 80µm to 3µm. Comparison with the multi-variable linear regression analysis the compensation accuracy is increased from ±10µm to ±3µm.

  7. Association of Employee Attributes and Exceptional Performance Rating at a National Center of the US Centers for Disease Control and Prevention, 2011.

    Science.gov (United States)

    Roberts, Henry; Myles, Ranell L; Truman, Benedict I; Dean, Hazel D

    2015-01-01

    Employee performance evaluation motivates and rewards exceptional individual performance that advances the achievement of organizational goals. The Centers for Disease Control and Prevention (CDC) and its operating units evaluate employee performance annually and reward exceptional performance with a cash award or quality step increase in pay. A summary performance rating (SPR) of "exceptional" indicated personal achievements in 2011 that were beyond expectations described in the employee's performance plan. To determine whether personal attributes and job setting of civil service employees were associated with an exceptional SPR in National Center for HIV/AIDS, Viral Hepatitis, STD, and TB Prevention (NCHHSTP) in 2011. Data from the CDC 2011 performance management database collected in 2012 were analyzed in 2013 to identify SPR, personal attributes, and job settings of full-time civil service employees. Multivariate logistic regression controlled for confounding and stratified analysis detected effect modifiers of the association between receiving an exceptional SPR in 2011 and gender, race/ethnicity, education, job location, job series, grade level, years in grade, years of federal service, supervisory role, and NCHHSTP division. Among the 1037 employees, exceptional SPR was independently associated with: female gender (adjusted odds ratio: 1.7 [1.3, 2.3]), advanced degrees (doctorate: 1.7 [1.1, 2.5] master's: [1.1, 2.0]), headquarters location (2.8 [1.9, 4.1]), higher pay grade (3.3 [2.4, 4.5]) and years in grade (0-1 years: 1.7 [1.3, 2.4]; 2-4 years: 1.5 [1.1, 2.0]), division level (Division A: 5.0 [2.5, 9.9]; Division B: 5.5 [3.5, 8.8]), and supervisory status (at a lower-pay grade) (odds ratio: 3.7 [1.1, 11.3]). Exceptional SPR is independently associated with personal employee attributes and job settings that are not modifiable by interventions designed to improve employee performance based on accomplishments.

  8. The VEPP-2000 Collider Control System: Operational Experience

    CERN Document Server

    Senchenko, A I; Lysenko, A P; Rogovsky, Yu A; Shatunov, P Yu

    2017-01-01

    The VEPP-2000 collider was commissioned and operated successfully in 2010-2013. During the operation the facility underwent continuous updates and experience in maintenance was acquired. Strong cooperation between the staff of the accelerator complex and the developers of the control system proved effective for implementing the necessary changes in a short time.

  9. Bisimulations for Delimited-Control Operators

    OpenAIRE

    Biernacki , Dariusz; Lenglet , Sergueï; Polesiuk , Piotr

    2017-01-01

    We propose a survey of the behavioral theory of an untyped lambda-calculus extended with the delimited-control operators shift and reset. We define a contextual equivalence for this calculus, that we then aim to characterize with coinductively defined relations, called bisimilarities. We study different styles of bisimilarities (namely applicative, normal form, and environmental), and we give several examples to illustrate their respective strengths and weaknesses. We also discuss how to exte...

  10. Social Media Integration into State-Operated Fusion Centers and Local Law Enforcement: Potential Uses and Challenges

    Science.gov (United States)

    2010-12-01

    NAVAL POSTGRADUATE SCHOOL MONTEREY, CALIFORNIA THESIS Approved for public release; distribution is unlimited SOCIAL MEDIA...DATE December 2010 3. REPORT TYPE AND DATES COVERED Master’s Thesis 4. TITLE AND SUBTITLE Social Media Integration into State-Operated Fusion...technologies, particularly social media, within fusion centers and local law enforcement entities could enable a more expedient exchange of information among

  11. The reference model of supply chain operational controlling in value management

    Directory of Open Access Journals (Sweden)

    2010-03-01

    Full Text Available The systemic approach of the controlling function to supporting the operations management results from its complex analysis of the supply chain business and operating results and from influencing the operations management factors - products, processes and resources that determine the achieved result (revenues, costs, profitability and assets turnover as well as the return on invested capital. All product features which stand for customer value and its competitiveness are the basis for designing, planning and controlling the interconnected processes responsible for manufacturing and delivery of products. The effectiveness of methods applied in developing products, processes and resources depends on the precise analysis and appraisal of the operating conditions that justify their application. Supporting the operations management, focused on the product value and improving the company's financial result, apart from financial, technical and economic analyses requires transferring the product value to activities control methods and to developing the resources in the product supply chain already at the stage of planning. As a result of an analysis of requirements supporting the development of processes and resources in the supply chain, a reference model of operational controlling in product value management was developed. The multicriterion selection and appropriate application of material flow management methods in the supply chain is each time preceded by an operating and financial analysis as well as by an appraisal of operating conditions that influence the choice of control methods.

  12. Operator interface for the PEP-II low level RF control system

    International Nuclear Information System (INIS)

    Allison, S.; Claus, R.

    1997-05-01

    This paper focuses on the operational aspects of the low level RF control system being built for the PEP-II storage rings at SLAC. Subsystems requiring major operational considerations include displays for monitor and control from UNIX workstations, slow feedback loops and control sequences residing on microprocessors, and various client applications in the existing SLAC Linear Collider (SLC) control system. Since commissioning of PEP-II RF is currently in-progress, only those parts of the control system used during this phase are discussed in detail. Based on past experience with the SLC control system, it is expected that effort expended during commissioning on a solid user interface will result in smoother transition to full reliable 24-hour-a-day operation

  13. Maintenance cost control at the Pacific Missile Test Center.

    OpenAIRE

    Jenson, Richard J.

    1980-01-01

    Approved for public release; distribution is unlimited The Pacific Missile Test Center (PMTC) is the Navy's largest Major Range and Test Facility Base, with an investment of over one billion dollars. The majority of this investment is in range test equipment and facilities including radar, telemetry, communication and command/ control systems. Concern is growing over the "excessively obsolete condition of PMTC technical equipment." Improvement of factors concerned with...

  14. Risk factors for computer visual syndrome (CVS) among operators of two call centers in São Paulo, Brazil.

    Science.gov (United States)

    Sa, Eduardo Costa; Ferreira Junior, Mario; Rocha, Lys Esther

    2012-01-01

    The aims of this study were to investigate work conditions, to estimate the prevalence and to describe risk factors associated with Computer Vision Syndrome among two call centers' operators in São Paulo (n = 476). The methods include a quantitative cross-sectional observational study and an ergonomic work analysis, using work observation, interviews and questionnaires. The case definition was the presence of one or more specific ocular symptoms answered as always, often or sometimes. The multiple logistic regression model, were created using the stepwise forward likelihood method and remained the variables with levels below 5% (p vision (43.5%). The prevalence of Computer Vision Syndrome was 54.6%. Associations verified were: being female (OR 2.6, 95% CI 1.6 to 4.1), lack of recognition at work (OR 1.4, 95% CI 1.1 to 1.8), organization of work in call center (OR 1.4, 95% CI 1.1 to 1.7) and high demand at work (OR 1.1, 95% CI 1.0 to 1.3). The organization and psychosocial factors at work should be included in prevention programs of visual syndrome among call centers' operators.

  15. Fuzzy control for optimal operation of complex chilling systems; Betriebsoptimierung von komplexen Kaelteanlagen mit Fuzzy-Control

    Energy Technology Data Exchange (ETDEWEB)

    Talebi-Daryani, R. [Fachhochschule Koeln (Germany). Lehrgebiet und Lab. fuer Regelungs- und Gebaeudeleittechnik; Luther, C. [JCI Regelungstechnik GmbH, Koeln (Germany)

    1998-05-01

    The optimization potentials for the operation of chilling systems within the building supervisory control systems are limited to abilities of PLC functions with their binary logic. The aim of this project is to replace inefficient PLC-solutions for the operation of chilling system by a Fuzzy control system. Optimal operation means: reducing operation time and operation costs of the system, reducing cooling energy generation- and consumption costs. Analysis of the thermal behaviour of the building and the chilling system is necessary, in order to find the current efficient cooling potentials and cooling methods during the operation. Three different Fuzzy controller have been developed with a total rule number of just 70. This realized Fuzzy control system is able to forecast the maximum cooling power of the building, but also to determine the cooling potential of the out door air. This new Fuzzy control system has been successfully commissioned, and remarkable improvement of the system behaviour is reached. Comparison of the system behaviour before and after the implementation of Fuzzy control system proved the benefits of the Fuzzy logic based operation system realized here. The system described here is a joint project between the University of applied sciences Cologne, and Johnson Controls International Cologne. The Fuzzy software tool used here (SUCO soft Fuzzy TECH 4.0), was provided by Kloeckner Moeller Bonn. (orig.) [Deutsch] Die Betriebsoptimierung von Kaelteanlagen innerhalb von Gebaeudeleitsystemen ist auf die Faehigkeiten von logischen Steuerverknuepfungen der Digitaltechnik begrenzt. In diesem Zusammenhang kann nur ein geringer Anteil der Information ueber das thermische Speicherverhalten des jeweiligen Gebaeudes herangezogen werden. Ziel des vorliegenden Projektes war es, die unzureichenden logischen Steuerverknuepfungen durch ein Fuzzy-Control-System zu ersetzen, um die Arbeitsweise der Kaelteanlage zu optimieren. Die Optimierungskriterien dieses

  16. Rosie: A mobile workstation for decontamination and dismantlement operations

    International Nuclear Information System (INIS)

    1994-01-01

    RedZone Robotics, Inc. and Carnegie Mellon University's Field Robotics Center have undertaken a contract to develop a next-generation worksystem for decommissioning and dismantlement tasks in Department of Energy (DOE) facilities. Currently, the authors are in the second phase of this three phase effort and are completing the design of the worksystem. Within this project RedZone is designing and fabricating a worksystem: Rosie. Rosie will include a locomotor, heavy manipulator, control center, and control system for robot operation. The locomotor is an omni-directional platform with tether management and hydraulic power capabilities. The heavy manipulator is a high-payload, long-reach system to deploy tools into the work area. The heavy manipulator will be capable of deploying systems such as the Dual-Arm Work Module--a five degree-of-freedom platform supporting two highly dexterous manipulators--or a single manipulator for performing simpler, less dexterous tasks. Rosie will be telerobotic to the point of having servo-controlled motions which can be operated and coordinated through the control center. This report describes the design of the systems. In phase three Rosie will be radiation-hardened and perform a demonstration in a contaminated facility

  17. 47 CFR 90.471 - Points of operation in internal transmitter control systems.

    Science.gov (United States)

    2010-10-01

    ...) SAFETY AND SPECIAL RADIO SERVICES PRIVATE LAND MOBILE RADIO SERVICES Transmitter Control Internal Transmitter Control Systems § 90.471 Points of operation in internal transmitter control systems. The... licensee for internal communications and transmitter control purposes. Operating positions in internal...

  18. BAGHOUSE FILTRATION PRODUCTS VERIFICATION TESTING, HOW IT BENEFITS THE BOILER BAGHOUSE OPERATOR

    Science.gov (United States)

    The paper describes the Environmental Technology Verification (ETV) Program for baghouse filtration products developed by the Air Pollution Control Technology Verification Center, one of six Centers under the ETV Program, and discusses how it benefits boiler baghouse operators. A...

  19. FNAL Booster intensity, extraction, and synchronization control for collider operation

    International Nuclear Information System (INIS)

    Ducar, R.J.; Lackey, J.R.; Tawzer, S.R.

    1987-03-01

    Booster operation for collider physics is considerably different than for fixed target operation. Various scenarios for collider physics, machine studies, and P-Bar targeting may require that the intensity vary from 5E10 PPP to 3E12 PPP at a 15 Hertz machine cycle rate. In addition to the normal Booster single turn extraction mode, collider operations require that the Booster inject into the Main Ring a small number of beam bunches for coalescing into a single high intensity bunch. These bunches must be synchronized such that the center bunch arrives in the RF bucket which corresponds to the zero phase of the coalescing cavity. The system implemented has the ability to deliver a precise fraction of the available 84 Booster beam bunches to Main Ring or to the P-Bar Debuncher via the newly installed AP-4 beam line for tune-up and studies. It is required that all of the various intensity and extraction scenarios be accommodated with minimal operator intervention

  20. 21 CFR 111.135 - What quality control operations are required for product complaints?

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 2 2010-04-01 2010-04-01 false What quality control operations are required for... MANUFACTURING, PACKAGING, LABELING, OR HOLDING OPERATIONS FOR DIETARY SUPPLEMENTS Production and Process Control System: Requirements for Quality Control § 111.135 What quality control operations are required for...

  1. Minatom of Russia Situation and Crisis Center and the Automated Federal Information System for Nuclear Material Control and Accounting

    International Nuclear Information System (INIS)

    Berchik, V.P.; Kasumova, L.A.; Babcock, R.A.; Heinberg, C.L.; Tynan, D.M.

    2001-01-01

    Under the Situation and Crisis Center (SCC) management, the Information Analytical Center (IAC) of the Ministry of Atomic Energy (Minatom) of Russia was created to oversee the operation of the Federal Nuclear Material Control and Accounting Information System (FIS). During 2000, the FIS achieved an important milestone in its development: the basic functions of the information system were implemented. This includes placing into operation the collecting and processing of nuclear material control and accounting (MC and A) information from the enterprises reporting to the FIS. The FIS began working with 14 Russian enterprises to develop and implement full-function reporting (i.e., reporting inventory and inventory changes including closeout and reconciliation between the FIS and enterprises). In 2001, the system will expand to include enterprise-level inventory information for all enterprises using nuclear materials in Russia. For this reason, at the end of 2000 through the beginning of 2001, five separate training sessions were held for over 100 enterprise personnel responsible for preparation and transfer of the reports to the FIS. Through the assistance of the Nuclear Material Protection, Control and Accounting (MPC and A) program, information systems for the accounting of nuclear materials are being installed at Russia enterprises. In creating the program for modernization of the Russian Federation State System of Accounting and Control (SSAC) of nuclear material, the SCC conducted a survey of the enterprises to determine the readiness of their internal MC and A systems for reporting to the FIS. Based on the information from the survey and the results of the projects on creation of local information systems at Russian enterprises, the analysis of information and the technical aspects of MC and A systems identified deficiencies that were analyzed and recommendations for eliminating these deficiencies were proposed. The concentration of analytical and administrative

  2. Sophistication of operator training using BWR plant simulator

    International Nuclear Information System (INIS)

    Ohshiro, Nobuo; Endou, Hideaki; Fujita, Eimitsu; Miyakita, Kouji

    1986-01-01

    In Japanese nuclear power stations, owing to the improvement of fuel management, thorough maintenance and inspection, and the improvement of facilities, high capacity ratio has been attained. The thorough training of operators in nuclear power stations also contributes to it sufficiently. The BWR operator training center was established in 1971, and started the training of operators in April, 1974. As of the end of March, 1986, more than 1800 trainees completed training. At present, in the BWR operator training center, No.1 simulator of 800 MW class and No.2 simulator of 1100 MW class are operated for training. In this report, the method, by newly adopting it, good result was obtained, is described, that is, the method of introducing the feeling of being present on the spot into the place of training, and the new testing method introduced in retraining course. In the simulator training which is apt to place emphasis on a central control room, the method of stimulating trainees by playing the part of correspondence on the spot and heightening the training effect of multiple monitoring was tried, and the result was confirmed. The test of confirmation on the control board was added. (Kako, I.)

  3. Science Operations Management

    Science.gov (United States)

    Squibb, Gael F.

    1984-10-01

    The operation teams for the Infrared Astronomical Satellite (IRAS) included scientists from the IRAS International Science Team. The scientific decisions on an hour-to-hour basis, as well as the long-term strategic decisions, were made by science team members. The IRAS scientists were involved in the analysis of the instrument performance, the analysis of the quality of the data, the decision to reacquire data that was contaminated by radiation effects, the strategy for acquiring the survey data, and the process for using the telescope for additional observations, as well as the processing decisions required to ensure the publication of the final scientific products by end of flight operations plus one year. Early in the project, two science team members were selected to be responsible for the scientific operational decisions. One, located at the operations control center in England, was responsible for the scientific aspects of the satellite operations; the other, located at the scientific processing center in Pasadena, was responsible for the scientific aspects of the processing. These science team members were then responsible for approving the design and test of the tools to support their responsibilities and then, after launch, for using these tools in making their decisions. The ability of the project to generate the final science data products one year after the end of flight operations is due in a large measure to the active participation of the science team members in the operations. This paper presents a summary of the operational experiences gained from this scientific involvement.

  4. Final Environmental Assessment for the construction and operation of an office building at the Stanford Linear Accelerator Center. Part 2

    International Nuclear Information System (INIS)

    1995-08-01

    The Department of Energy (DOE) has prepared an Environmental Assessment (EA), DOE/EA-1107, analyzing the environmental effects relating to the construction and operation of an office building at the Stanford Linear Accelerator Center (SLAC). SLAC is a national facility operated by Stanford University, California, under contract with DOE. The center is dedicated to research in elementary particle physics and in those fields that make use of its synchrotron facilities. The objective for the construction and operation of an office building is to provide adequate office space for existing SLAC Waste Management (WM) personnel, so as to centralize WM personnel and to make WM operations more efficient and effective. Based on the analyses in the EA, the DOE has determined that the proposed action does not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 (NEPA). Therefore, the preparation of an Environmental Impact Statement is not required. This report contains the Environmental Assessment, as well as the Finding of No Significant Impact (FONSI)

  5. 75 FR 4830 - Advisory Committee to the Director (ACD), Centers for Disease Control (CDC) and Prevention-Ethics...

    Science.gov (United States)

    2010-01-29

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Advisory Committee to the Director (ACD), Centers for Disease Control (CDC) and Prevention--Ethics Subcommittee (ES..., CDC, regarding a broad range of public health ethics questions and issues arising from programs...

  6. Improve and reinforced aspects associated with the behaviour of control-room operators of NNPPS

    International Nuclear Information System (INIS)

    Lucas, A. S.

    2002-01-01

    This article is devoted to explain the training experience carried out in Tecnatom, in order to improve and reinforce aspects associated with the behavior of Control-Room (CR) Operators of Nuclear Power Stations (Reactor Operators/Supervisors) in the training Simulator-setting, centered mainly in aspects of: Team Work, Effective Communications, Use of Procedures, Self checking, Decisions Making, Diagnosis, Leadership, Motivation and other attitudes to promote during the shift. The experience has been positive for everybody and the results welcomed by the participants, who have fed back the process positively. The experienced training cycle is new and it basically consists in developing, in the Simulator setting and, with a specific programme, behaviors in such a way that the participants reflect and, consider as theirs, the expectations and criteria developed on the previously points, where the role of the instructor Assistant, is only to guide, help, observe, challenge, encourage, create possibilities, motivate, suggest and reflect in such a way that the participant may be able to learn by himself. (Author)

  7. Controllable conditional quantum oscillations and quantum gate operations in superconducting flux qubits

    International Nuclear Information System (INIS)

    Chen Aimin; Cho Samyoung

    2011-01-01

    Conditional quantum oscillations are investigated for quantum gate operations in superconducting flux qubits. We present an effective Hamiltonian which describes a conditional quantum oscillation in two-qubit systems. Rabi-type quantum oscillations are discussed in implementing conditional quantum oscillations to quantum gate operations. Two conditional quantum oscillations depending on the states of control qubit can be synchronized to perform controlled-gate operations by varying system parameters. It is shown that the conditional quantum oscillations with their frequency synchronization make it possible to operate the controlled-NOT and -U gates with a very accurate gate performance rate in interacting qubit systems. Further, this scheme can be applicable to realize a controlled multi-qubit operation in various solid-state qubit systems. (author)

  8. Application of digital process controller for automatic pulse operation in the NSRR

    International Nuclear Information System (INIS)

    Ishijima, K.; Ueda, T.; Saigo, M.

    1992-01-01

    The NSRR at JAERI is a modified TRIGA Reactor. It was built for investigating reactor fuel behavior under reactivity initiated accident (RIA) conditions. Recently, there has been a need to improve the flexibility of pulsing operations in the NSRR to cover a wide range of accidental situations, including RIA events at elevated power levels, and various abnormal power transients. To satisfy this need, we developed a new reactor control system which allows us to perform 'Shaped Pulse Operation: SP' and 'Combined Pulse Operation: CP'. Quick, accurate and complicated manipulation of control rods was required to realize these operations. Therefore we installed a new reactor control system, which we call an automatic pulse control system. This control system is composed of digital processing controllers and other digital equipments, and is fully automated and highly accurate. (author)

  9. Hypertension Control and co-morbidities in primary health care centers in Riyadh

    Energy Technology Data Exchange (ETDEWEB)

    Al-Tuwijri, Abdulmohsin A [Dept. of Family Medicine, Ministry of Health, Riyadh (Saudi Arabia); Al-Rukban, Mohammed Othman [Dept. of Family and Community Medicine, Coll. of Medicine, King Saud Univ., Riyadh (Saudi Arabia)

    2006-07-01

    The prevalence of hypertension in Saudi Arabia has been assessed only in preliminary reports. The aim of this study was to determine the degree of control of blood pressure and the prevalence of common hypertension co-morbidities among hypertensive patients attending primary health care (PHC) centers in Riyadh. A cross sectional study was conducted by reviewing medical records of hypertensive patients during May and June 2001. Two hundred fifty-five medical records selected by a stratified randomization process according to the distribution of the 73 PHC centers in the city and the total number of hypertensive patients registered in the mini-clinic of each PHC-center. Trained mini-clinic nurses collected data using a data collection form developed for this purpose. Of 255 patients, 121 (47.5%) were males and 134 (52.5%) were females, the mean age was 57.2+-11.1 years and 8.3% were smokers. The majority 204 (85.7%) had greater than normal body weight. Only 101 (40.4%) had controlled systolic BP. The most common co-morbidity was diabetes mellitus found in 98 (38.4%), followed by dislipidemia in 50 (19.6%), bronchial asthma in 28 (11.0%) and renal diseases in 12 (4.7%). Except for osteoporosis, which was reported by females only (P=0.003), the occurrences of hypertensive co-morbidities did not vary from other demographic characteristics. This study demonstrated poor blood pressure control in the mini-clinics in the PHC-centers. To improve the quality of care for hypertensive patients, we recommend an improvement in PHC physician knowledge of and attitudes toward the importance of achieving targeted blood pressure levels. (author)

  10. Hypertension Control and co-morbidities in primary health care centers in Riyadh

    International Nuclear Information System (INIS)

    Al-Tuwijri, Abdulmohsin A.; Al-Rukban, Mohammed Othman

    2006-01-01

    The prevalence of hypertension in Saudi Arabia has been assessed only in preliminary reports. The aim of this study was to determine the degree of control of blood pressure and the prevalence of common hypertension co-morbidities among hypertensive patients attending primary health care (PHC) centers in Riyadh. A cross sectional study was conducted by reviewing medical records of hypertensive patients during May and June 2001. Two hundred fifty-five medical records selected by a stratified randomization process according to the distribution of the 73 PHC centers in the city and the total number of hypertensive patients registered in the mini-clinic of each PHC-center. Trained mini-clinic nurses collected data using a data collection form developed for this purpose. Of 255 patients, 121 (47.5%) were males and 134 (52.5%) were females, the mean age was 57.2+-11.1 years and 8.3% were smokers. The majority 204 (85.7%) had greater than normal body weight. Only 101 (40.4%) had controlled systolic BP. The most common co-morbidity was diabetes mellitus found in 98 (38.4%), followed by dislipidemia in 50 (19.6%), bronchial asthma in 28 (11.0%) and renal diseases in 12 (4.7%). Except for osteoporosis, which was reported by females only (P=0.003), the occurrences of hypertensive co-morbidities did not vary from other demographic characteristics. This study demonstrated poor blood pressure control in the mini-clinics in the PHC-centers. To improve the quality of care for hypertensive patients, we recommend an improvement in PHC physician knowledge of and attitudes toward the importance of achieving targeted blood pressure levels. (author)

  11. D0 Central Tracking Solenoid Energization, Controls, Interlocks and Quench Protection Operating Procedures

    International Nuclear Information System (INIS)

    Hance, R.

    1998-01-01

    This procedure is used when it is necessary to operate the solenoid energization, controls, interlocks and quench detection system. Note that a separate procedure exists for operating the solenoid 'cryogenic' systems. Only D0 Control Room Operators or the Project Electrical Engineer are qualified to execute these procedures or operate the solenoid system. This procedure assumes that the operator is familiar with using the Distributed Manufacturing Automation and Control Software (DMACS).

  12. Analysis of Access Control Policies in Operating Systems

    Science.gov (United States)

    Chen, Hong

    2009-01-01

    Operating systems rely heavily on access control mechanisms to achieve security goals and defend against remote and local attacks. The complexities of modern access control mechanisms and the scale of policy configurations are often overwhelming to system administrators and software developers. Therefore, mis-configurations are common, and the…

  13. Operative Treatment of Hepatic Hydatid Cysts: A Single Center Experience in Israel, a Nonendemic Country

    Science.gov (United States)

    Maoz, Daniel; Greif, Franklin; Chen, Jacob

    2013-01-01

    Background. Hydatid cyst disease is a zoonosis caused by Echinococcus genera. The disease is endemic to certain rural areas in the world. Operative treatment is the main component in curing hydatid cysts of the liver. Objective. Describing the unique characteristics of the hydatid cyst patients in Israel, a nonendemic country. Methods. Data was collected form 29 patients treated operatively in Rabin Medical Center from 1994 to 2007. Results. The study included 18 females and 11 males with an average age of 54.9 years. Fifty-two% of the patients immigrated as children from Arab countries to Israel, 21% were Arab-Israelis leaving in the north and center of Israel, and 24% immigrated from the former Communist Bloc. Pericystectomy was performed in 20/29, and cyst unroofing was performed in 9/29. Hydatid cysts average size was 10.7 cm, and the cysts were located in the right or left or involved both lobes in 62%, 28%, and 10% of the lesions, respectively. Postoperative mortality occurred in one case, and severe morbidity occurred in 4 patients. Conclusions. Hydatid cyst disease in Israel is uncommon and is mostly seen in distinct 3 demographic groups. Despite the relatively low patient volume, good results in terms of morbidity, mortality, and recurrence were achieved. PMID:24175100

  14. RECOVERY ACT: DYNAMIC ENERGY CONSUMPTION MANAGEMENT OF ROUTING TELECOM AND DATA CENTERS THROUGH REAL-TIME OPTIMAL CONTROL (RTOC): Final Scientific/Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Ron Moon

    2011-06-30

    This final scientific report documents the Industrial Technology Program (ITP) Stage 2 Concept Development effort on Data Center Energy Reduction and Management Through Real-Time Optimal Control (RTOC). Society is becoming increasingly dependent on information technology systems, driving exponential growth in demand for data center processing and an insatiable appetite for energy. David Raths noted, 'A 50,000-square-foot data center uses approximately 4 megawatts of power, or the equivalent of 57 barrels of oil a day1.' The problem has become so severe that in some cases, users are giving up raw performance for a better balance between performance and energy efficiency. Historically, power systems for data centers were crudely sized to meet maximum demand. Since many servers operate at 60%-90% of maximum power while only utilizing an average of 5% to 15% of their capability, there are huge inefficiencies in the consumption and delivery of power in these data centers. The goal of the 'Recovery Act: Decreasing Data Center Energy Use through Network and Infrastructure Control' is to develop a state of the art approach for autonomously and intelligently reducing and managing data center power through real-time optimal control. Advances in microelectronics and software are enabling the opportunity to realize significant data center power savings through the implementation of autonomous power management control algorithms. The first step to realizing these savings was addressed in this study through the successful creation of a flexible and scalable mathematical model (equation) for data center behavior and the formulation of an acceptable low technical risk market introduction strategy leveraging commercial hardware and software familiar to the data center market. Follow-on Stage 3 Concept Development efforts include predictive modeling and simulation of algorithm performance, prototype demonstrations with representative data center equipment to

  15. Report on the consultants` meeting on technical aspects of the co-operation of nuclear reaction data centers

    Energy Technology Data Exchange (ETDEWEB)

    Lemmel, H D; Schwerer, O; Wienke, H [eds.

    1995-10-01

    The IAEA Nuclear Data Section convenes in annual intervals coordination meetings of the Network of the Nuclear Reaction Data Center. The present meeting dealt with technical matters of the nuclear data compilation and exchange by means of the jointly operated computerized systems CINDA, EXFOR, ENDF and others. Refs, figs and tabs.

  16. Report on the consultants' meeting on technical aspects of the co-operation of nuclear reaction data centers

    International Nuclear Information System (INIS)

    Lemmel, H.D.; Schwerer, O.; Wienke, H.

    1995-10-01

    The IAEA Nuclear Data Section convenes in annual intervals coordination meetings of the Network of the Nuclear Reaction Data Center. The present meeting dealt with technical matters of the nuclear data compilation and exchange by means of the jointly operated computerized systems CINDA, EXFOR, ENDF and others. Refs, figs and tabs

  17. Development of operator requested control system applications: Experience with the SLC control system at SLAC

    International Nuclear Information System (INIS)

    Stanek, M.

    1995-01-01

    The SLC Control system at SLAC has evolved into a powerful tool for operation of the accelerator and for troubleshooting the unique problems encountered in extracting maximum performance from the SLC. The evolution has included the development of many custom applications and user interface features generated from accelerator operator and accelerator physicist requests. These applications are written and maintained primarily by the Controls Software Engineering group, and not by the users themselves. The process of developing and supporting user requested control systems applications at SLAC is described, including the effects of organizational structure, formal and informal procedures, and control system architecture

  18. Data Center Tasking.

    Science.gov (United States)

    Temares, M. Lewis; Lutheran, Joseph A.

    Operations tasking for data center management is discussed. The original and revised organizational structures of the data center at the University of Miami are also described. The organizational strategy addresses the functions that should be performed by the data center, anticipates the specialized skills required, and addresses personnel…

  19. Control Operator for the Two-Dimensional Energized Wave Equation

    Directory of Open Access Journals (Sweden)

    Sunday Augustus REJU

    2006-07-01

    Full Text Available This paper studies the analytical model for the construction of the two-dimensional Energized wave equation. The control operator is given in term of space and time t independent variables. The integral quadratic objective cost functional is subject to the constraint of two-dimensional Energized diffusion, Heat and a source. The operator that shall be obtained extends the Conjugate Gradient method (ECGM as developed by Hestenes et al (1952, [1]. The new operator enables the computation of the penalty cost, optimal controls and state trajectories of the two-dimensional energized wave equation when apply to the Conjugate Gradient methods in (Waziri & Reju, LEJPT & LJS, Issues 9, 2006, [2-4] to appear in this series.

  20. NASA's OCA Mirroring System: An Application of Multiagent Systems in Mission Control

    Science.gov (United States)

    Sierhuis, Maarten; Clancey, William J.; vanHoof, Ron J. J.; Seah, Chin H.; Scott, Michael S.; Nado, Robert A.; Blumenberg, Susan F.; Shafto, Michael G.; Anderson, Brian L.; Bruins, Anthony C.; hide

    2009-01-01

    Orbital Communications Adaptor (OCA) Flight Controllers, in NASA's International Space Station Mission Control Center, use different computer systems to uplink, downlink, mirror, archive, and deliver files to and from the International Space Station (ISS) in real time. The OCA Mirroring System (OCAMS) is a multiagent software system (MAS) that is operational in NASA's Mission Control Center. This paper presents OCAMS and its workings in an operational setting where flight controllers rely on the system 24x7. We also discuss the return on investment, based on a simulation baseline, six months of 24x7 operations at NASA Johnson Space Center in Houston, Texas, and a projection of future capabilities. This paper ends with a discussion of the value of MAS and future planned functionality and capabilities.

  1. Empirical investigation of workloads of operators in advanced control rooms

    International Nuclear Information System (INIS)

    Kim, Yochan; Jung, Wondea; Kim, Seunghwan

    2014-01-01

    This paper compares the workloads of operators in a computer-based control room of an advanced power reactor (APR 1400) nuclear power plant to investigate the effects from the changes in the interfaces in the control room. The cognitive-communicative-operative activity framework was employed to evaluate the workloads of the operator's roles during emergency operations. The related data were obtained by analyzing the tasks written in the procedures and observing the speech and behaviors of the reserved operators in a full-scope dynamic simulator for an APR 1400. The data were analyzed using an F-test and a Duncan test. It was found that the workloads of the shift supervisors (SSs) were larger than other operators and the operative activities of the SSs increased owing to the computer-based procedure. From these findings, methods to reduce the workloads of the SSs that arise from the computer-based procedure are discussed. (author)

  2. CARMENES instrument control system and operational scheduler

    Science.gov (United States)

    Garcia-Piquer, Alvaro; Guàrdia, Josep; Colomé, Josep; Ribas, Ignasi; Gesa, Lluis; Morales, Juan Carlos; Pérez-Calpena, Ana; Seifert, Walter; Quirrenbach, Andreas; Amado, Pedro J.; Caballero, José A.; Reiners, Ansgar

    2014-07-01

    The main goal of the CARMENES instrument is to perform high-accuracy measurements of stellar radial velocities (1m/s) with long-term stability. CARMENES will be installed in 2015 at the 3.5 m telescope in the Calar Alto Observatory (Spain) and it will be equipped with two spectrographs covering from the visible to the near-infrared. It will make use of its near-IR capabilities to observe late-type stars, whose peak of the spectral energy distribution falls in the relevant wavelength interval. The technology needed to develop this instrument represents a challenge at all levels. We present two software packages that play a key role in the control layer for an efficient operation of the instrument: the Instrument Control System (ICS) and the Operational Scheduler. The coordination and management of CARMENES is handled by the ICS, which is responsible for carrying out the operations of the different subsystems providing a tool to operate the instrument in an integrated manner from low to high user interaction level. The ICS interacts with the following subsystems: the near-IR and visible channels, composed by the detectors and exposure meters; the calibration units; the environment sensors; the front-end electronics; the acquisition and guiding module; the interfaces with telescope and dome; and, finally, the software subsystems for operational scheduling of tasks, data processing, and data archiving. We describe the ICS software design, which implements the CARMENES operational design and is planned to be integrated in the instrument by the end of 2014. The CARMENES operational scheduler is the second key element in the control layer described in this contribution. It is the main actor in the translation of the survey strategy into a detailed schedule for the achievement of the optimization goals. The scheduler is based on Artificial Intelligence techniques and computes the survey planning by combining the static constraints that are known a priori (i.e., target

  3. 76 FR 57744 - Advisory Committee to the Director (ACD), Centers for Disease Control and Prevention (CDC)-Ethics...

    Science.gov (United States)

    2011-09-16

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Advisory Committee to the Director (ACD), Centers for Disease Control and Prevention (CDC)--Ethics Subcommittee (ES) Correction: This notice was published in the Federal Register on September 8, 2011, Volume 76, Number 174...

  4. Analysis of intentional drug poisonings using Ohio Poison Control Center Data, 2002-2014.

    Science.gov (United States)

    Pringle, Kelsey; Caupp, Sarah; Shi, Junxin; Wheeler, Krista K; Spiller, Henry A; Casavant, Marcel J; Xiang, Henry

    2017-08-01

    Pharmaceutical drug poisonings, especially those that are intentional, are a serious problem for adolescents and young adults. Poison control center data is a viable tool to track intentional drug poisonings in near real-time. To determine intentional drug poisoning rates among adolescents and young adults in Ohio using poison control center data. We analyzed data from 2002 to 2014 obtained by Ohio's three poison control centers. Inclusion variables were calls made to the centers that had appropriate subject age (10-29 years old), subject sex, involved substance (all drug classes), and medical outcome (no effect, minor effect, moderate effect, major effect, and death). Intentional drug poisoning reports were also separated into subgroups to compare suspected suicide reports to misuse and abuse reports. Finally, resident population estimates were used to generate 2014 intentional drug poisoning rates for each county in Ohio. The most common age group for intentional drug poisonings was 18-24. Females reported more suspected suicide drug poisonings while males reported more misuse/abuse drug poisonings. The most reported drug class across all ages was analgesics. Of the 88 counties in Ohio, Hamilton, Williams, Washington, and Guernsey counties had the highest rates of intentional drug poisonings. The high report rate of suspected suicides and analgesic class drugs demonstrates the need for preventative measures for adolescents and young adults in Ohio. Any interventions, along with legislative changes, will need to take place in our local communities.

  5. Numerical analysis of thermal environment control in high density data center

    Energy Technology Data Exchange (ETDEWEB)

    Kwon, Oh Kyung; Kim, Hyeon Joong; Cha, Dong An [Korea Institute of Industrial Technology, Cheonan (Korea, Republic of)

    2012-08-15

    Increasing heat generation in CPUs can hamper effective recirculation and by pass because of the large temperature difference between the exhaust and the intake air through a server room. This increases the overall temperature inside a data center and decreases the efficiency of the data center's cooling system. The purpose of the data center's cooling system is to separate the intake and exhaust air by controlling the computer room air conditioner(CRAC). In this study, ICEPAK is used to conduct a numerical analysis of a data center's cooling system. The temperature distribution and the entire room are analyzed for different volumetric flow rates. The optimized volumetric flow rate is found for each CPU power. The heat removal and temperature distribution for CPU powers of 100, 120, and 140W are found to be the best for a volumetric flow rate of 0.15m'3'/s. The numerical analysis is verified through RTI indicators, and the results appear to be the most reliable when the RTI value is 81.

  6. Touch-sensitive graphics terminal applied to process control

    International Nuclear Information System (INIS)

    Bennion, S.I.; Creager, J.D.; VanHouten, R.D.

    1981-01-01

    Limited initial demonstrations of the system described took place during September 1980. A single CRT was used an an input device in the control center while operating a furnace and a pellet inspection gage. These two process line devices were completely controlled, despite the longer than desired response times noted, using a single control station located in the control center. The operator could conveniently execute any function from this remote location which could be performed locally at the hard-wired control panels. With the installation of the enhancements, the integrated touchscreen/graphics terminal will provide a preferable alternative to normal keyboard command input devices

  7. Control and decision strategies in wastewater treatment plants for operation improvement

    CERN Document Server

    Santín, Ignacio; Vilanova, Ramón

    2017-01-01

    This book examines the operation of biological wastewater treatment plants (WWTPs), with a focus on maintaining effluent water quality while keeping operational costs within constrained limits. It includes control operation and decision schemes and is based on the use of benchmarking scenarios that yield easily reproducible results that readers can implement for their own solutions. The final criterion is the effect of the applied control strategy on plant performance – specifically, improving effluent quality, reducing costs and avoiding violations of established effluent limits. The evaluation of the different control strategies is achieved with the help of two Benchmark Simulation Models (BSM1, BSM2). Given the complexity of the biological and biochemical processes involved and the major fluctuations in the influent flow rate, controlling WWTPs poses a serious challenge. Further, the importance of control goal formulation and control structure design in relation to WWTP process control is widely recogniz...

  8. Mental models of the operator

    International Nuclear Information System (INIS)

    Stary, I.

    2004-01-01

    A brief explanation is presented of the mental model concept, properties of mental models and fundamentals of mental models theory. Possible applications of such models in nuclear power plants are described in more detail. They include training of power plant operators, research into their behaviour and design of the operator-control process interface. The design of a mental model of an operator working in abnormal conditions due to power plant malfunction is outlined as an example taken from the literature. The model has been created based on analysis of experiments performed on a nuclear power plant simulator, run by a training center. (author)

  9. Research on Integrated Control of Microgrid Operation Mode

    Science.gov (United States)

    Cheng, ZhiPing; Gao, JinFeng; Li, HangYu

    2018-03-01

    The mode switching control of microgrid is the focus of its system control. According to the characteristics of different control, an integrated control system is put forward according to the detecting voltage and frequency deviation after switching of microgrid operating mode. This control system employs master-slave and peer-to-peer control. Wind turbine and photovoltaic(PV) adopt P/Q control, so the maximum power output can be achieved. The energy storage will work under the droop control if the system is grid-connected. When the system is off-grid, whether to employ droop control or P/f control is determined by system status. The simulation has been done and the system performance can meet the requirement.

  10. Progress towards steady-state operation and real time control of internal transport barriers in JET

    International Nuclear Information System (INIS)

    Litaudon, X.

    2002-01-01

    In JET advanced tokamak research mainly focuses on plasmas with internal transport barriers (ITBs), generated by modifications of the current profile. The formerly developed optimised shear regime with low magnetic shear in the plasma center has been extended to deeply reversed magnetic shear configurations. ITBs occur at much lower access powers. The achievement of high fusion performance is reported in deeply reversed magnetic shear configuration. The generation of plasmas with wide ITBs in this configuration has allowed an extension of the accessible normalised toroidal beta at high magnetic field. We report on the successful sustainment and control of the electron and ion ITB in full current drive operation with a large fraction of bootstrap current. Progress towards the steady state capability of ITB plasmas includes techniques to avoid strong ELM activity and the newly developed real time control of the local ITB strength. Thanks to the real time control of the ITB characteristics the improved confinement state is maintained in a more reproducible and stable manner in quasi-stationary conditions. (author)

  11. Mitigating the Long term Operating Extreme Load through Active Control

    DEFF Research Database (Denmark)

    Koukoura, Christina; Natarajan, Anand

    2014-01-01

    blade azimuth location are shown to affect the extreme blade load magnitude during operation in normal turbulence wind input. The simultaneously controlled operation of generator torque variation and pitch variation at low blade pitch angles is detected to be responsible for very high loads acting...... on the blades. Through gain scheduling of the controller (modifications of the proportional Kp and the integral Ki gains) the extreme loads are mitigated, ensuring minimum instantaneous variations in the power production for operation above rated wind speed. The response of the blade load is examined...

  12. Operation control device for nuclear power plants

    International Nuclear Information System (INIS)

    Suto, Osamu.

    1982-01-01

    Purpose: To render the controlling functions of a central control console more centralized by constituting the operation controls for a nuclear power plant with computer systems having substantially independent functions such as those of plant monitor controls, reactor monitor management and CRT display and decreasing interactions between each of the systems. Constitution: An input/output device for the input of process data for a nuclear power plant and indication data for a plant control console is connected to a plant supervisory and control computer system and a display computer system, the plant supervisory control computer system and a reactor and management computer system are connected with a CRT display control device, a printer and a CRT display input/output device, and the display computer system is connected with the CRT display control device and the CRT display unit on the central control console, whereby process input can be processed and displayed at high speed. (Yoshino, Y.)

  13. Operational control of material release and discharges from nuclear power plant

    International Nuclear Information System (INIS)

    Szabo, I. C.; Ranga, T.; Daroczi, L.; Deme, S.; Kerekes, A.

    2003-01-01

    The operational control of radioactive materials during atmospheric release and aquatic discharge from nuclear power plant is a licensing criterion for NPPs. Originally at the Paks NPP the release control was based on activity limits for four groups of elements. These groups were noble gases, long living radio-aerosols, radioiodine and radiostrontium for atmospheric release and specified activity limit for beta emitters, strontium and tritium for aquatic discharge into Danube. These groups were controlled with proper sampling and/or measuring instrumentation. The limit for atmospheric release was given as a 30-day moving average, for liquid discharges the annual limit was stipulated. The new release and discharge limitation system is based on the environmental dose limitation. The dose constraint for Paks NPP is 90 Sv/year of the critical group for all release pathways and the investigation dose limit is equal to 27 Sv/year. The regulation did not subdivide the dose limit for atmospheric and liquid components but for operational control subdivision of dose limits for atmospheric release and aquatic discharge and shorter time period (one day-one month) seems to be useful. The subdivision can be based on past release data and/or previous activity limits. To satisfy dose below the investigation dose limit there should be a proper operation control level for each separately measured component and pathway belonging to reasonable time interval significantly shorter than one year. The main task of the NPP staff is elaboration of reasonable control levels and reference time intervals for different radionuclide and element groups to be used in operational control. Operational control levels are based on measured daily or monthly release rates. In case of noble gases, aerosols and iodine the daily release rates have several sharp peaks per year. Operational control levels give opportunity to detect these peaks for internal investigation purposes. Investigation release limits

  14. Neutron field control cybernetics model of RBMK reactor operator

    International Nuclear Information System (INIS)

    Polyakov, V.V.; Postnikov, V.V.; Sviridenkov, A.N.

    1992-01-01

    Results on parameter optimization for cybernetics model of RBMK reactor operator by power release control function are presented. Convolutions of various criteria applied previously in algorithms of the program 'Adviser to reactor operator' formed the basis of the model. 7 refs.; 4 figs

  15. Numerical simulation of manual operation at MID stand control room

    International Nuclear Information System (INIS)

    Doca, C.; Dobre, A.; Predescu, D.; Mielcioiu, A.

    2003-01-01

    Since 2000 at INR Pitesti a package of software products devoted to numerical simulation of manual operations at fueling machine control room was developed. So far, specified, designed, worked out and implemented was the PUPITRU code. The following issues were solved: graphical aspects of specific computer - human operator interface; functional and graphical simulation of the whole associated equipment of the control desk components; implementation of the main notation as used in the automated schemes of the control desk in view of the fast identification of the switches, lamps, instrumentation, etc.; implementation within PUPITRU code of the entire data base used in the frame of MID tests; implementation of a number of about 1000 numerical simulation equations describing specific operational MID testing situations

  16. The psychology of computer displays in the modern mission control center

    Science.gov (United States)

    Granaas, Michael M.; Rhea, Donald C.

    1988-01-01

    Work at NASA's Western Aeronautical Test Range (WATR) has demonstrated the need for increased consideration of psychological factors in the design of computer displays for the WATR mission control center. These factors include color perception, memory load, and cognitive processing abilities. A review of relevant work in the human factors psychology area is provided to demonstrate the need for this awareness. The information provided should be relevant in control room settings where computerized displays are being used.

  17. [Using the subcutaneous approach for symptoms control in a health center].

    Science.gov (United States)

    Pascual López, L; Portaceli Armiñana, A; Ros Sáez, A

    2001-01-01

    To describe the use of the subcutaneous tract for symptoms control in patients those are in phase of palliative treatment of their illness. Observational study. Primary care. Patients seen in a health center, in phase of palliative treatment of their illness, that needed for symptoms control the subcutaneous administration of drugs. Most of the patients were in terminal phase (19), the fundamental cause (17 cases) that justified the use of the subcutaneous tract was the difficulty to take drugs by oral tract in the last days of life, attention on death throes. The infusion continuous through injector type travenol, at an infusion speed of 2 ml/h, it was the most common way of drug administration (19 patients). The drugs and initial average dose most used were: morphine 19 patients dose 100 mg/24 h, hyoscine butylbromide (Buscapina), 13 patients, 60 mg/24 h, haloperidol 12 patients, 4 mg/24 h. The patients death was the main cause that justified the retirement of the continuous infusion (17 people sick), happening in its own home. Symptoms control was good or very good in the most of patients (14). The experience on using the subcutaneous tract for symptoms control in our health center is positive, being the fundamental cause for its use symptoms control in the last days of the patients life. The continuous subcutaneous infusion should be used in primary attention, as an usual technique for the symptoms control in patients that are in phase of palliative treatment of their illness.

  18. Electric Power Research Institute: Environmental Control Technology Center: Report to the Steering Committee, March 1996. Final technical report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    Operations and maintenance continued this month at the Electric Power Research Institute`s Environmental Control Technology Center. Testing on the 4.0 MW Pilot Wet FGD unit continued this month with the Carbon Injection System for the Hazardous Air Pollutant (HAP) test block. With this testing, the mercury measurement (Method 29) studies also continued with various impinger capture solutions. Also, the installation of the B&W/CHX Heat Exchanger unit was completed in March. The 4.0 MW Spray Dryer Absorber System (Carbon Injection System) and the 4.0 MW Pilot Wet FGD Unit and were utilized in the HAP test configuration this month. The 1.0 MW Cold-Side Selective Catalytic Reduction (SCR) unit remained idle this month in a cold- standby mode. Monthly inspections were conducted for all equipment in cold-standby, as well as for the fire safety systems, and will continue to be conducted by the ECTC Operations and Maintenance staff.

  19. Toward human-centered man-machine system in nuclear power plants

    International Nuclear Information System (INIS)

    Tanabe, Fumiya

    1993-01-01

    The Japanese LWR power plants are classified into 4 categories, from the viewpoints of the control panel in central control room and the extent of automation. Their characteristics are outlined. The potential weaknesses indwelt in the conventional approaches are discussed; that are the loss of applicability to the unanticipated facts and the loss of morale of the operators. The need for the construction of human-centered man-machine system is emphasized in order to overcome these potential weaknesses. The most important features required for the system are, in short term, to support operators in dificulties, and at the same time, in long term, to assure the acquisition and conservation of the personnels' morale and potential to cope with the problems. The concepts of the 'ecological interface' and 'adaptive aiding' system are introduced as the design concepts for the human-centered man-machine system. (J.P.N.)

  20. The proposed EROSpace institute, a national center operated by space grant universities

    Science.gov (United States)

    Smith, Paul L.; Swiden, LaDell R.; Waltz, Frederick A.

    1993-01-01

    The "EROSpace Institute" is a proposed visiting scientist program in associated with the U.S. Geological Survey's EROS Data Center (EDC). The Institute would be operated by a consortium of universities, possible drawn from NASA's Space Grant College and Fellowship Program consortia and the group of 17 capability-enhancement consortia, or perhaps from consortia though out the nation with a topical interest in remote sensing. The National Center for Atmospheric Research or the Goddard Institute for Space Studies provide models for the structure of such an institute. The objectives of the Institute are to provide ready access to the body of data housed at the EDC and to increase the cadre of knowledgeable and trained scientists able to deal with the increasing volume of remote sensing data to become available from the Earth Observing System. The Institute would have a staff of about 100 scientists at any one time, about half permanent staff, and half visiting scientists. The latter would include graduate and undergraduate students, as well as faculty on temporary visits, summer fellowships, or sabbatical leaves. The Institute would provide office and computing facilities, as well as Internet linkages to the home institutions so that scientists could continue to participate in the program from their home base.

  1. 77 FR 41188 - Advisory Committee on Breast Cancer in Young Women, Centers for Disease Control and Prevention...

    Science.gov (United States)

    2012-07-12

    ... Committee on Breast Cancer in Young Women, Centers for Disease Control and Prevention: Notice of Charter..., that the Advisory Committee on Breast Cancer in Young Women, Centers for Disease Control and Prevention... Committee on Breast Cancer in Young Women, HHS, CDC, 4770 Buford Highway, NE., Mailstop K52, Atlanta...

  2. Control procedure for well drilling operations

    Energy Technology Data Exchange (ETDEWEB)

    Bourdon, J C

    1988-09-09

    A control procedure of rotary drilling operations is proposed. It uses the Drill off test. The drill-off test permits to determine the rock drill speed variation as a function of the wright applied on the top of the pipe. We can deduce from that a rock drill wear parameter. The method permits to prevent a rupture and its grave economic consequences.

  3. 21 CFR 111.130 - What quality control operations are required for returned dietary supplements?

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 2 2010-04-01 2010-04-01 false What quality control operations are required for... and Process Control System: Requirements for Quality Control § 111.130 What quality control operations are required for returned dietary supplements? Quality control operations for returned dietary...

  4. Distributed Low-Complexity Controller for Wind Power Plant in Derated Operation

    DEFF Research Database (Denmark)

    Biegel, Benjamin; Madjidian, Daria; Spudic, Vedrana

    2013-01-01

    We consider a wind power plant of megawatt wind turbines operating in derated mode. When operating in this mode, the wind power plant controller is free to distribute power set-points to the individual turbines, as long as the total power demand is met. In this work, we design a controller...... that exploits this freedom to reduce the fatigue on the turbines in the wind power plant. We show that the controller can be designed in a decentralized manner, such that each wind turbine is equipped with a local low-complexity controller relying only on few measurements and little communication. As a basis...... for the controller design, a linear wind turbine model is constructed and verified in an operational wind power plant of megawatt turbines. Due to limitations of the wind power plant available for tests, it is not possible to implement the developed controller; instead the final distributed controller is evaluated...

  5. Computer programme for operator support in primary frequency control of NPP Dukovany

    International Nuclear Information System (INIS)

    Kurka, J.; Petruzela, I.; Piroutek, Z.

    1996-01-01

    The computer programme for the control room operator support in the primary frequency control operation of the NPP Dukovany power unit is described. This operational mode has recently been implemented. Until now, the plant has been exclusively operated in the based-load mode at nominal power. The stability of the main unit parameters, unit power output and main steam header pressure, is the characteristic feature for this mode of operation of units with WWER 440 type of reactors. This does no more hold in the new mode in which these both principal parameters vary in dependency on the power network frequency changes. This fact, however, has an important impact on the activities of the control room operators. Therefore, to help them to adapt themselves easily and without unnecessary stresses to new conditions the regulatory body when licensing the new mode finally approved its implementation only if computerized operator support system would be installed in the control room. Such a computer program for the operator support has been recently developed in EGU Prague and has already been implemented into the unit information system on all four Dukovany units. (author). 3 refs, 7 figs

  6. IEEE Std 649-1980: IEEE standard for qualifying Class 1E motor control centers for nuclear power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This standard describes the basic principles, requirements, and methods for qualifying Class 1E motor control centers for outside containment applications in nuclear power generating stations. Qualification of motor control centers located inside containment in a nuclear power generating station is beyond the scope of this standard. The purpose of this standard is (1) to define specific qualification requirements for Class 1E motor control centers in accordance with the more general qualification requirements of IEEE Std 323-1974, IEE Standard for Qualifying Class 1E Equipment for Nuclear Power Generating Stations; (2) to provide guidance in establishing a qualification program for demonstrating the design adequacy of Class 1E motor control centers in nuclear power generating station applications

  7. Operator Informational Needs for Multiple Autonomous Small Vehicles

    Science.gov (United States)

    Trujillo, Anna C.; Fan, Henry; Cross, Charles D.; Hempley, Lucas E.; Cichella, Venanzio; Puig-Navarro, Javier; Mehdi, Syed Bilal

    2015-01-01

    With the anticipated explosion of small unmanned aerial vehicles, it is highly likely that operators will be controlling fleets of autonomous vehicles. To fulfill the promise of autonomy, vehicle operators will not be concerned with manual control of the vehicle; instead, they will deal with the overall mission. Furthermore, the one operator to many vehicles is becoming a constant meme with various industries including package delivery, search and rescue, and utility companies. In order for an operator to concurrently control several vehicles, his station must look and behave very differently than the current ground control station instantiations. Furthermore, the vehicle will have to be much more autonomous, especially during non-normal operations, in order to accommodate the knowledge deficit or the information overload of the operator in charge of several vehicles. The expected usage increase of small drones requires presenting the operational information generated by a fleet of heterogeneous autonomous agents to an operator. NASA Langley Research Center's Autonomy Incubator has brought together researchers in various disciplines including controls, trajectory planning, systems engineering, and human factors to develop an integrated system to study autonomy issues. The initial human factors effort is focusing on mission displays that would give an operator the overall status of all autonomous agents involved in the current mission. This paper will discuss the specifics of the mission displays for operators controlling several vehicles.

  8. Intelligent systems supporting the control room operators

    International Nuclear Information System (INIS)

    Berger, E.

    1997-01-01

    The operational experience obtained with the various applications of the systems discussed in this paper shows that more consequent use of the systems will make detection and management of disturbances still more efficient and faster. This holds true both for a low level of process automation and for power plants with a high level of automation. As for conventional power plants, the trend clearly is towards higher degrees of automation and consequent application of supporting systems. Thus, higher availability and rapid failure management are achieved, at low effects on normal operation. These systems are monitoring and process control systems, expert systems, and systems for optimal use of the equipment, or systems for post-incident analyses and computer-assisted on-shift protocols, or operating manuals. (orig./CB) [de

  9. 47 CFR 78.51 - Remote control operation.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Remote control operation. 78.51 Section 78.51 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES CABLE TELEVISION RELAY... shall also be equipped with suitable devices for observing the overall characteristics of the...

  10. Initial operation of NSTX with plasma control

    International Nuclear Information System (INIS)

    Gates, D.; Bell, M.; Ferron, J.; Kaye, S.; Menard, J.; Mueller, D.; Neumeyer, C.; Sabbagh, S.

    2000-01-01

    First plasma, with a maximum current of 300kA, was achieved on NSTX in February 1999. These results were obtained using preprogrammed coil currents. The first controlled plasmas on NSTX were made starting in August 1999 with the full 1MA plasma current achieved in December 1999. The controlled quantities were plasma position (R, Z) and current (Ip). Variations in the plasma shape are achieved by adding preprogrammed currents to those determined by the control parameters. The control system is fully digital, with plasma position and current control, data acquisition, and power supply control all occurring in the same four-processor real time computer. The system uses the PCS (Plasma Control Software) system designed at General Atomics. Modular control algorithms, specific to NSTX, were written and incorporated into the PCS. The application algorithms do the actual control calculations, with the PCS handling data passing. The control system, including planned upgrades, will be described, along with results of the initial controlled plasma operations. Analysis of the performance of the control system will also be presented

  11. Quality control in the low activity radioanalytical laboratory of the Environmental Division, DIEAM.CN of NUCLEBRAS Research Center - CDTN

    International Nuclear Information System (INIS)

    Carvalho, M.A.G. de

    1988-01-01

    The Environmental Engineering Division - DIEAM.CN of NUCLEBRAS research center - CTDN, is in charge of the routine work related to the analysis of environment samples collected at several NUCLEBRAS facilities. This paper presents the procedures used for quality control of the analyses performed at the Laboratory. The samples are initially verified and recorded as soon as they arrive at the Division. From then on, each aliquot and each analysis will be controlled using a follow-up sheet. Once a year, the operational conditions of the Lab couting systems are verified thoroughly. At that time, the systems are calibrated using certified radioactivity standards. Performance of the detectors is checked using control graphs, which can indicate the need for specific procedures to be followed such as maintenance, decontamination or recalibration. In order to reduce the risk of mistakes and to increase the capacity for global data evaluation, a microcomputer is used for processing the counting data and for editing a final report. (author) [pt

  12. Performance confirmation operation of water environment control facility

    International Nuclear Information System (INIS)

    Magome, Hirokatsu; Okada, Yuji; Tomita, Kenji; Iida, Kazuhiro; Ando, Hitoshi; Yonekawa, Akihisa; Ueda, Haruyasu; Hanawa, Hiroshi; Kanno, Masaru; Sakuta, Yoshiyuki

    2015-09-01

    In Japan Atomic Energy Agency, in order to solve the problem in the long-term operation of a light water reactor, preparation which does the irradiation experiment of light-water reactor fuel and material was advanced. JMTR stopped after the 165th operation cycle in August 2006, and is advancing renewal of the irradiation facility towards re-operation. The material irradiation test facility was installed from 2008 fiscal year to 2012 fiscal year in JMTR. The material irradiation test facility is used for IASCC study, and consists of mainly three equipments. This report described performance operating test of the water environmental control facilities for IASCC study carried out 2013 fiscal year. (author)

  13. Quench monitoring and control system and method of operating same

    Science.gov (United States)

    Ryan, David Thomas; Laskaris, Evangelos Trifon; Huang, Xianrui

    2006-05-30

    A rotating machine comprising a superconductive coil and a temperature sensor operable to provide a signal representative of superconductive coil temperature. The rotating machine may comprise a control system communicatively coupled to the temperature sensor. The control system may be operable to reduce electric current in the superconductive coil when a signal representative of a defined superconducting coil temperature is received from the temperature sensor.

  14. Developing operator capacity estimates for supervisory control of autonomous vehicles.

    Science.gov (United States)

    Cummings, M L; Guerlain, Stephanie

    2007-02-01

    This study examined operators' capacity to successfully reallocate highly autonomous in-flight missiles to time-sensitive targets while performing secondary tasks of varying complexity. Regardless of the level of autonomy for unmanned systems, humans will be necessarily involved in the mission planning, higher level operation, and contingency interventions, otherwise known as human supervisory control. As a result, more research is needed that addresses the impact of dynamic decision support systems that support rapid planning and replanning in time-pressured scenarios, particularly on operator workload. A dual screen simulation that allows a single operator the ability to monitor and control 8, 12, or 16 missiles through high level replanning was tested on 42 U.S. Navy personnel. The most significant finding was that when attempting to control 16 missiles, participants' performance on three separate objective performance metrics and their situation awareness were significantly degraded. These results mirror studies of air traffic control that demonstrate a similar decline in performance for controllers managing 17 aircraft as compared with those managing only 10 to 11 aircraft. Moreover, the results suggest that a 70% utilization (percentage busy time) score is a valid threshold for predicting significant performance decay and could be a generalizable metric that can aid in manning predictions. This research is relevant to human supervisory control of networked military and commercial unmanned vehicles in the air, on the ground, and on and under the water.

  15. Reactor control system upgrade for the McClellan Nuclear Radiation Center Sacramento, CA

    International Nuclear Information System (INIS)

    Power, M. A.

    1999-01-01

    Argonne National Laboratory is currently developing a new reactor control system for the McClellan Nuclear Radiation Facility. This new control system not only provides the same functionality as the existing control system in terms of graphic displays of reactor process variables, data archival capability, and manual, automatic, pulse and square-wave modes of operation, but adds to the functionality of the previous control system by incorporating signal processing algorithms for the validation of sensors and automatic calibration and verification of control rod worth curves. With the inclusion of these automated features, the intent of this control system is not to replace the operator but to make the process of controlling the reactor easier and safer for the operator. For instance, an automatic control rod calibration method reduces the amount of time to calibrate control rods from days to minutes, increasing overall reactor utilization. The control rod calibration curve, determined using the automatic calibration system, can be validated anytime after the calibration, as long as the reactor power is between 50W and 500W. This is done by banking all of the rods simultaneously and comparing the tabulated rod worth curves with a reactivity computer estimate. As long as the deviation between the tabulated values and the reactivity estimate is within a prescribed error band, then the system is in calibration. In order to minimize the amount of information displayed, only the essential flux-related data are displayed in graphical format on the control screen. Information from the sensor validation methods is communicated to the operators via messages, which appear in a message window. The messages inform the operators that the actual process variables do not correlate within the allowed uncertainty in the reactor system. These warnings, however, cannot cause the reactor to shutdown automatically. The reactor operator has the ultimate responsibility of using this

  16. Note: Wide-operating-range control for thermoelectric coolers

    Science.gov (United States)

    Peronio, P.; Labanca, I.; Ghioni, M.; Rech, I.

    2017-11-01

    A new algorithm for controlling the temperature of a thermoelectric cooler is proposed. Unlike a classic proportional-integral-derivative (PID) control, which computes the bias voltage from the temperature error, the proposed algorithm exploits the linear relation that exists between the cold side's temperature and the amount of heat that is removed per unit time. Since this control is based on an existing linear relation, it is insensitive to changes in the operating point that are instead crucial in classic PID control of a non-linear system.

  17. Design of Air Traffic Control Operation System

    Directory of Open Access Journals (Sweden)

    Gabriela STROE

    2017-09-01

    Full Text Available This paper presents a numerical simulation for a different aircraft, based on the specific aircraft data that can be incorporated in the model and the equations of motions which can be consequently solved. The aircraft flight design involves various technical steps and requires the use of sophisticated software having modeling and simulation capabilities. Within the flight simulation model, the aerodynamic model can be regarded as the most complex and most important. With appropriate aerodynamic modeling the aerodynamic forces and moments acting on the aircraft's center of gravity can be numerically solved with accuracy. These forces and moments are further used to solve the equations of motion. The development of control and computing technology makes it possible for advanced flight control strategy. The advanced control techniques tend to make the control design and their implementation much more complicated with more control loops or channels; in this line, the autopilot of modern aircrafts includes a variety of automatic control systems that aid and support the flight navigation, flight management, and perform the enhancing and/or augmenting of the stability characteristics of the airplane. Therefore in this context it is very important to choose the dynamic that will satisfy the performance and robustness specifications.

  18. Role Allocations and Communications of Operators during Emergency Operation in Advanced Main Control Rooms

    International Nuclear Information System (INIS)

    Lee, June Seung

    2009-01-01

    The advanced main control room (MCR) in GEN III + nuclear power plants has been designed by adapting modern digital I and C techniques and an advanced man machine interface system (MMIS). Large Display Panels (LDPs) and computer based workstations are installed in the MCR. A Computerized Procedure System (CPS) and Computerized Operation Support System (COSS) with high degrees of automation are supplied to operators. Therefore, it is necessary to set up new operation concepts in advanced MCRs that are different from those applied in conventional MCRs regarding role allocations and communications of operators. The following presents a discussion of the main differences between advanced MCRs and conventional MCRs from the viewpoint of role allocations and communications. Efficient models are then proposed on the basis of a task analysis on a series of emergency operation steps

  19. Analysis and Improvement of Control Algorithm for Operation Mode Transition due to Input Channel Trouble in Control Systems

    International Nuclear Information System (INIS)

    Ahn, Myunghoon; Kim, Woogoon; Yim, Hyeongsoon

    2016-01-01

    The PI (Proportional plus Integral) controller, which is the essential functional block in control systems, can automatically perform the stable control of an important plant process while reducing the steady state error and improving the transient response. However, if the received input PV (Process Variable) is not normal due to input channel trouble, it will be difficult to control the system automatically. For this reason, many control systems are implemented to change the operation mode from automatic to manual mode in the PI controller when the failed input PV is detected. If the PI controller is in automatic mode for all the time, the control signal varies as the change of the input PV is continuously reflected in the control algorithm. In the other cases, since the controller changes into the manual mode at t=0, the control signal is fixed at the last PI controller output and thus the feedback control is not performed anymore until the operator takes an action such as the operation mode change. As a result of analysis and simulations for the controller’s operation modes in all the cases of input channel trouble, we discovered that it is more appropriate to maintain the automatic mode despite the bad quality in the PV. Therefore, we improved the control system algorithm reflecting the analysis results for the operator’s convenience and the stability of a control system

  20. Analysis and Improvement of Control Algorithm for Operation Mode Transition due to Input Channel Trouble in Control Systems

    Energy Technology Data Exchange (ETDEWEB)

    Ahn, Myunghoon; Kim, Woogoon; Yim, Hyeongsoon [KEPCO Engineering and Construction Co., Deajeon (Korea, Republic of)

    2016-10-15

    The PI (Proportional plus Integral) controller, which is the essential functional block in control systems, can automatically perform the stable control of an important plant process while reducing the steady state error and improving the transient response. However, if the received input PV (Process Variable) is not normal due to input channel trouble, it will be difficult to control the system automatically. For this reason, many control systems are implemented to change the operation mode from automatic to manual mode in the PI controller when the failed input PV is detected. If the PI controller is in automatic mode for all the time, the control signal varies as the change of the input PV is continuously reflected in the control algorithm. In the other cases, since the controller changes into the manual mode at t=0, the control signal is fixed at the last PI controller output and thus the feedback control is not performed anymore until the operator takes an action such as the operation mode change. As a result of analysis and simulations for the controller’s operation modes in all the cases of input channel trouble, we discovered that it is more appropriate to maintain the automatic mode despite the bad quality in the PV. Therefore, we improved the control system algorithm reflecting the analysis results for the operator’s convenience and the stability of a control system.