WorldWideScience

Sample records for operational readiness review

  1. Operational readiness review phase-1 final report for WRAP-1

    Energy Technology Data Exchange (ETDEWEB)

    Bowen, W., Westinghouse Hanford

    1996-12-27

    This report documents the Operational Readiness Review for WRAP-1 Phase-1 operations. The report includes all criteria, lines of inquiry with resulting Findings and Observations. The review included assessing operational capability of the organization and the computer controlled process and facility systems.

  2. Operational Readiness Review: Savannah River Replacement Tritium Facility

    International Nuclear Information System (INIS)

    1993-02-01

    The Operational Readiness Review (ORR) is one of several activities to be completed prior to introducing tritium into the Replacement Tritium Facility (RTF) at the Savannah River Site (SRS). The Secretary of Energy will rely in part on the results of this ORR in deciding whether the startup criteria for RTF have been met. The RTF is a new underground facility built to safely service the remaining nuclear weapons stockpile. At RTF, tritium will be unloaded from old components, purified and enriched, and loaded into new or reclaimed reservoirs. The RTF will replace an aging facility at SRS that has processed tritium for more than 35 years. RTF has completed construction and is undergoing facility startup testing. The final stages of this testing will require the introduction of limited amounts of tritium. The US Department of Energy (DOE) ORR was conducted January 19 to February 4, 1993, in accordance with an ORR review plan which was developed considering previous readiness reviews. The plan also considered the Defense Nuclear Facilities Safety Board (DNFSB) Recommendations 90-4 and 92-6, and the judgements of experienced senior experts. The review covered three major areas: (1) Plant and Equipment Readiness, (2) Personnel Readiness, and (3) Management Systems. The ORR Team was comprised of approximately 30 members consisting of a Team Leader, Senior Safety Experts, and Technical Experts. The ORR objectives and criteria were based on DOE Orders, industry standards, Institute of Nuclear Power Operations guidelines, recommendations of external oversight groups, and experience of the team members

  3. Operational readiness review for the Waste Experimental Reduction Facility. Final report

    International Nuclear Information System (INIS)

    1993-11-01

    An Operational Readiness Review (ORR) at the Idaho National Engineering Laboratory's (INEL's) Waste Experimental Reduction Facility (WERF) was conducted by EG ampersand G Idaho, Inc., to verify the readiness of WERF to resume operations following a shutdown and modification period of more than two years. It is the conclusion of the ORR Team that, pending satisfactory resolution of all pre-startup findings, WERF has achieved readiness to resume unrestricted operations within the approved safety basis. ORR appraisal forms are included in this report

  4. Operational Readiness Review Final Report for K Basin Fuel Transfer System

    International Nuclear Information System (INIS)

    DAVIES, T.H.

    2002-01-01

    An Operational Readiness Review (ORR) was conducted by the U.S. Department of Energy (DOE), Richland Operations Office (RL) to verify that an adequate state of readiness had been achieved for startup of the K Basin Fuel Transfer System (FTS). The DOE ORR was conducted during the period November 6-18, 2002. The DOE ORR team concluded that the K Basin Fuel Transfer System is ready to start operations, subject to completion and verification of identified pre-start findings. The ORR was conducted in accordance with the Spent Nuclear Fuel (SNF) K Basin Fuel Transfer System (FTS) Operational Readiness Review (ORR) Plan of Action and the Operational Readiness Review Implementation Plan for K Basin Fuel Transfer System. Review activities consisted of staff interviews, procedure and document reviews, and observations of normal facility operations, operational upset conditions, and an emergency drill. The DOE ORR Team also reviewed and assessed the adequacy of the contractor ORR3 and the RL line management review. The team concurred with the findings and observations identified in these two reports. The DOE ORR for the FTS evaluated the contractor under single-shift operations. Of concern to the ORR Team was that SNF Project management intended to change from a single-shift FTS operation to a two-shift operation shortly after the completion of the DOE ORR. The ORR team did not assess two-shift FTS operations and the ability of the contractor to conduct a smooth transition from shift to shift. However, the DOE ORR team did observe an operational upset drill that was conducted during day shift and carried over into swing shift; during this drill, swing shift was staffed with fewer personnel as would be expected for two-shift operations. The facility was able to adequately respond to the event with the reduced level of staff. The ORR Team was also able to observe a Shift Manager turnover meeting when one shift manager had to be relieved during the middle of the day. The ORR

  5. Operational readiness reviews for restart of L reactor

    International Nuclear Information System (INIS)

    Finley, R.H.

    1984-01-01

    The L Reactor at the Savannah River Plant is being restarted after being in a standby status since 1968. Operational Readiness Reviews (ORRs) were conducted by DOE-SR and contractor personnel concurrent with the restart activity. This paper summarizes the ORR activity

  6. Implementation plan for WRAP Module 1 operational readiness review

    International Nuclear Information System (INIS)

    Irons, L.G.

    1994-01-01

    The Waste Receiving and Processing Module 1 (WRAP 1) will be used to receive, sample, treat, and ship contact-handled (CH) transuranic (TRU), low-level waste (LLW), and low-level mixed waste (LLMW) to storage and disposal sites both on the Hanford site and off-site. The primary mission of WRAP 1 is to characterize and certify CH waste in 55-gallon and 85-gallon drums; and its secondary function is to certify CH waste standard waste boxes (SWB) and boxes of similar size for disposal. The WRAP 1 will provide the capability for examination (including x-ray, visual, and contents sampling), limited treatment, repackaging, and certification of CH suspect-TRU waste in 55-gallon drums retrieved from storage, as well as newly generated CH LLW and CH TRU waste drums. The WRAP 1 will also provide examination (X-ray and visual only) and certification of CH LLW and CH TRU waste in small boxes. The decision to perform an Operational Readiness Review (ORR) was made in accordance with WHC-CM-5-34, Solid Waste Disposal Operations Administration, Section 1.4, Operational Readiness Activities. The ORR will ensure plant and equipment readiness, management and personnel readiness, and management programs readiness for the initial startup of the facility. This implementation plan is provided for defining the conduct of the WHC ORR

  7. Department of Energy Operational Readiness Review for the Waste Isolation Pilot Plant

    Energy Technology Data Exchange (ETDEWEB)

    None

    2016-12-01

    The U.S. Department of Energy (DOE) has completed an Operational Readiness Review (ORR) for the restart of Contact Handled (CH) waste emplacement at the Waste Isolation Pilot Plant (WIPP) located near Carlsbad, New Mexico. The ORR team assessed the readiness of Nuclear Waste Partnership, LLC (NWP) to manage and perform receipt through CH waste emplacement, and associated waste handling and management activities, including the ability of the National TRU Program (NTP) to evaluate the waste currently stored at the WIPP site against the revised and enhanced Waste Acceptance Criteria (WAC). Field work for this review began on November 14, 2015 and was completed on November 30, 2016. The DOE ORR was conducted in accordance with the Department of Energy Operational Readiness Review Implementation Plan for the Waste Isolation Pilot Plant, dated November 8, 2016, and DOE Order 425.1D, Verification of Readiness to Start Up or Restart Nuclear Facilities. The review activities included personnel interviews, record reviews, direct observation of operations and maintenance demonstrations, and observation of multiple operational and emergency drills/exercises. The DOE ORR also evaluated the adequacy of the contractor’s ORR (CORR) and the readiness of the DOE Carlsbad field Office (CBFO) to oversee the startup and execution of CH waste emplacement activities at the WIPP facility. The WIPP facility is categorized as a Hazard Category 2 DOE Nonreactor Nuclear Facility for all surface and Underground (UG) operations per DOE-STD-1027-92, Hazard Categorization and Accident Analysis Techniques for Compliance with DOE Order 5480.23, Nuclear Safety Analysis Reports. In addition, the WIPP experienced two events in February, 2014 that resulted in Accident Investigations being performed in accordance with the requirements of DOE Order 225.1B, Accident Investigations. Based upon the results of the accident investigations and hazard categorization of the facility, the team placed

  8. Operational Readiness Review Final Report For F-Canyon Restart. Phase 1

    Energy Technology Data Exchange (ETDEWEB)

    McFarlane, A.F.; Spangler, J.B.

    1995-04-05

    An independent WSRC Operational Readiness Review was performed for the restart of Phase 1 processing in F-Canyon, Building 221-F. Readiness to restart the Second Plutonium Cycle process and solvent recovery was assessed. The ORR was conducted by an ORR board of ten members with the support of a subject matter expert. The chairman and four members were drawn from the Operational Safety Evaluation Department, ESH& QA Division; additional members were drawn from other WSRC divisions, independent of the F-Canyon operating division (NMPD). Based on the results of the readiness verification assessments performed according to the ORR plan and the validation of pre-restart corrective actions, the WSRC independent ORR Board has concluded that the facility has achieved the state of readiness committed to in the Restart Plan. Also, based on the scope of the ORR, it is the opinion of the board that F-Canyon Phase 1 processes can be restarted without undue risk to the safety of the public and onsite workers and without undue risk to the environment.

  9. Operational Readiness Review Final Report For F-Canyon Restart. Phase 1

    International Nuclear Information System (INIS)

    McFarlane, A.F.; Spangler, J.B.

    1995-01-01

    An independent WSRC Operational Readiness Review was performed for the restart of Phase 1 processing in F-Canyon, Building 221-F. Readiness to restart the Second Plutonium Cycle process and solvent recovery was assessed. The ORR was conducted by an ORR board of ten members with the support of a subject matter expert. The chairman and four members were drawn from the Operational Safety Evaluation Department, ESH ampersand QA Division; additional members were drawn from other WSRC divisions, independent of the F-Canyon operating division (NMPD). Based on the results of the readiness verification assessments performed according to the ORR plan and the validation of pre-restart corrective actions, the WSRC independent ORR Board has concluded that the facility has achieved the state of readiness committed to in the Restart Plan. Also, based on the scope of the ORR, it is the opinion of the board that F-Canyon Phase 1 processes can be restarted without undue risk to the safety of the public and onsite workers and without undue risk to the environment

  10. Operational Readiness Review Plan for the Radioisotope Thermoelectric Generator Materials Production Tasks

    Science.gov (United States)

    Cooper, R. H.; Martin, M. M.; Riggs, C. R.; Beatty, R. L.; Ohriner, E. K.; Escher, R. N.

    1990-04-19

    In October 1989, a US shuttle lifted off from Cape Kennedy carrying the spacecraft Galileo on its mission to Jupiter. In November 1990, a second spacecraft, Ulysses, will be launched from Cape Kennedy with a mission to study the polar regions of the sun. The prime source of power for both spacecraft is a series of radioisotope thermoelectric generators (RTGs), which use plutonium oxide (plutonia) as a heat source. Several of the key components in this power system are required to ensure the safety of both the public and the environment and were manufactured at Oak Ridge National Laboratory (ORNL) in the 1980 to 1983 period. For these two missions, Martin Marietta Energy Systems, Inc. (Energy Systems), will provide an iridium alloy component used to contain the plutonia heat source and a carbon composite material that serves as a thermal insulator. ORNL alone will continue to fabricate the carbon composite material. Because of the importance to DOE that Energy Systems deliver these high quality components on time, performance of an Operational Readiness Review (ORR) of these manufacturing activities is necessary. Energy Systems Policy GP 24 entitled "Operational Readiness Process" describes the formal and comprehensive process by which appropriate Energy Systems activities are to be reviewed to ensure their readiness. This Energy System policy is aimed at reducing the risks associated with mission success and requires a management approved "readiness plan" to be issued. This document is the readiness plan for the RTG materials production tasks.

  11. DOE Richland readiness review for PUREX

    International Nuclear Information System (INIS)

    Zamorski, M.J.

    1984-01-01

    For ten months prior to the November 1983 startup of the Plutonium and URanium EXtraction (PUREX) Plant, the Department of Energy's Richland Operations Office conducted an operational readiness review of the facility. This review was performed consistent with DOE and RL Order 5481.1 and in accordance with written plans prepared by the program and safety divisions. It involved personnel from five divisions within the office. The DOE review included two tasks: (1) overview and evaluation of the operating contractor's (Rockwell Hanford) readiness review for PUREX, and (2) independent assessment of 25 significant aspects of the startup effort. The RL reviews were coordinated by the program division and were phased in succession with the contractor's readiness review. As deficiencies or concerns were noted in the course of the review they were documented and required formal response from the contractor. Startup approval was given in three steps as the PUREX Plant began operation. A thorough review was performed and necessary documentation was prepared to support startup authorization in November 1983, before the scheduled startup date

  12. Operational readiness of EFAD systems

    International Nuclear Information System (INIS)

    Kabat, M.J.

    1992-02-01

    An assessment of the operational readiness of the Emergency Filtered Air Discharge (EFAD) systems, installed in Canadian CANDU multi-unit nuclear power plants, was performed in this project. Relevant Canadian and foreign standards and regulatory requirements have been reviewed and documentation on EFAD system design, operation, testing and maintenance have been assessed to identify likely causes and potential failures of EFAD systems and their components under both standby and accident conditions. Recommendations have also been provided in this report for revisions which are needed to achieve and maintain appropriate operational readiness of EFAD systems

  13. Process operational readiness and operational readiness follow-on

    International Nuclear Information System (INIS)

    Nertney, R.J.

    1992-11-01

    The first document in the System Safety Development Center (SSDC) series deals with the subject of Occupancy-Use Readiness. The material included in that manual provided the basis for development of the SSDC workshop in Operational Readiness. The original Occupancy Readiness Manual, however, deals only generally with the subject of process safety; i.e., the safety of overall ''processes'' such as solar collection systems, nuclear reactors, and coal fired electrical plants. The manual also fails to detail the considerations involved in maintaining the state of readiness on a continuing basis. Both of the latter subjects are dealt with in some detail in the SSDC's Operational Readiness Workshop. The purpose of this document is to provide additional documentary material dealing with subjects introduced in SSDC-1 Occupancy-Use Readiness Manual, and SSDC-12, Safety Considerations in Evaluation of Maintenance Programs. In augmenting SSDC-1, Part I of this manual provides additional material related to process safety; in the case of SSDC-12, the subject of safety considerations in evaluation of maintenance programs is broadened in Part II to include maintenance of personnel systems and procedural systems as well as hardware. ''Maintenance'' is related more directly to the concept of operational readiness and an alternative analytical tree is provided for hardware maintenance program evaluation

  14. Operational readiness review implementation plan for K Basin sludge water system

    International Nuclear Information System (INIS)

    IRWIN, R.M.

    2003-01-01

    This Implementation Plan (IP) has been prepared consistent with the requirements of U.S. Department of Energy (DOE) Order 425.1B, ''Startup and Restart of Nuclear Facilities'', and DOE-STD-3006-2000, ''Planning and Conduct of Operational Readiness Reviews'' (ORR) (DOE 2002). The scope of the DOE ORR is described in the RL ''Plan of Action, K Basin Sludge Water System'' (Veitenheimer 2003), prepared by DOE project line management and approved by the RL Manager, the designated Approval Authority, on March 20, 2003. The scope of the contractor ORR is described in the contractor ''Plan of Action for the K Basins Sludge Water System Operational Readiness Review'' (FH 2002a) which was prepared by Spent Nuclear Fuel (SNF) Project line management and approved by the DOE Richland Operations Office (RL) Manager on December 19, 2002. DOE Order 425.1B indicates that the Secretarial Officer is the Authorization Authority when substantial modifications are made to a Hazard Category 2 nuclear facility. This Authorization Authority has been delegated to the RL Manager by memorandum from Jessie Hill Roberson, dated February 5, 2003 (Roberson 2003). This IP provides the overall approach and guidelines for performance of the DOE ORR. Appendix A contains the Criteria and Review Approach Documents (CRAD), which define the review objectives and criteria as well as the approach for assessing each objective. ORR results will be published in a final report, as discussed in Section 9.4

  15. Vogtle Unit 1 readiness review: Assessment of Georgia Power Company readiness review pilot program

    International Nuclear Information System (INIS)

    Lewis, G.

    1987-09-01

    Georgia Power Company (GPC) performed a readiness review at Vogtle Unit 1 as a pilot program. The pilot program was a new and innovative approach for the systematic and disciplined review, with senior management involvement, of GPC's implementation of design, construction, and operational readiness processes. The program's principal objective was to increase the level of assurance that quality programs at Vogtle Unit 1 have been accomplished in accordance with regulatory requirements. This report assesses the effectiveness of the GPC's readiness review pilot program (RRPP) at Vogtle Unit 1. It includes (1) an overview of what was experienced during the program's implementation, (2) an assessment of how well program objectives were met, and (3) lessons learned on the future use of the readiness review concept. Overall, GPC and the NRC staff believe that the RRPP at Vogtle Unit 1 was a success and that the program provided significant added assurance that Vogtle Unit 1 licensing commitments and NRC regulations have been adequately implemented. Although altering the NRC licensing review process for the few plants still in the construction pipeline may not be appropriate, licensees may benefit significantly by performing readiness reviews on their own initiative as GPC did for Vogtle. (7 refs.)

  16. Phase V storage (Project W-112) Central Waste Complex operational readiness review, final report

    International Nuclear Information System (INIS)

    Wight, R.H.

    1997-01-01

    This document is the final report for the RFSH conducted, Contractor Operational Readiness Review (ORR) for the Central Waste Complex (CWC) Project W-112 and Interim Safety Basis implementation. As appendices, all findings, observations, lines of inquiry and the implementation plan are included

  17. Phase 5 storage (Project W-112) Central Waste Complex operational readiness review, final report

    Energy Technology Data Exchange (ETDEWEB)

    Wight, R.H.

    1997-05-30

    This document is the final report for the RFSH conducted, Contractor Operational Readiness Review (ORR) for the Central Waste Complex (CWC) Project W-112 and Interim Safety Basis implementation. As appendices, all findings, observations, lines of inquiry and the implementation plan are included.

  18. Lessons Learned from Sandia National Laboratories' Operational Readiness Review of the Annular Core Research Reactor (ACRR)

    International Nuclear Information System (INIS)

    Bendure, Albert O.; Bryson, James W.

    1999-01-01

    The Sandia ACRR (a Hazard Category 2 Nuclear Reactor Facility) was defueled in June 1997 to modify the reactor core and control system to produce medical radioisotopes for the Department of Energy (DOE) Isotope Production Program. The DOE determined that an Operational Readiness Review (ORR) was required to confirm readiness to begin operations within the revised safety basis. This paper addresses the ORR Process, lessons learned from the Sandia and DOE ORRS of the ACRR, and the use of the ORR to confirm authorization basis implementation

  19. Lessons Learned from Sandia National Laboratories' Operational Readiness Review of the Annular Core Research Reactor (ACRR)

    Energy Technology Data Exchange (ETDEWEB)

    Bendure, Albert O.; Bryson, James W.

    1999-05-17

    The Sandia ACRR (a Hazard Category 2 Nuclear Reactor Facility) was defueled in June 1997 to modify the reactor core and control system to produce medical radioisotopes for the Department of Energy (DOE) Isotope Production Program. The DOE determined that an Operational Readiness Review (ORR) was required to confirm readiness to begin operations within the revised safety basis. This paper addresses the ORR Process, lessons learned from the Sandia and DOE ORRS of the ACRR, and the use of the ORR to confirm authorization basis implementation.

  20. AGR-5/6/7 LEUCO Kernel Fabrication Readiness Review

    Energy Technology Data Exchange (ETDEWEB)

    Marshall, Douglas W. [Idaho National Lab. (INL), Idaho Falls, ID (United States). Fuel Design and Development; Bailey, Kirk W. [Idaho National Lab. (INL), Idaho Falls, ID (United States). ART Quality Assurance Engineer

    2015-02-01

    In preparation for forming low-enriched uranium carbide/oxide (LEUCO) fuel kernels for the Advanced Gas Reactor (AGR) fuel development and qualification program, Idaho National Laboratory conducted an operational readiness review of the Babcock & Wilcox Nuclear Operations Group – Lynchburg (B&W NOG-L) procedures, processes, and equipment from January 14 – January 16, 2015. The readiness review focused on requirements taken from the American Society Mechanical Engineers (ASME) Nuclear Quality Assurance Standard (NQA-1-2008, 1a-2009), a recent occurrence at the B&W NOG-L facility related to preparation of acid-deficient uranyl nitrate solution (ADUN), and a relook at concerns noted in a previous review. Topic areas open for the review were communicated to B&W NOG-L in advance of the on-site visit to facilitate the collection of objective evidences attesting to the state of readiness.

  1. Operational readiness review of the Low Level Waste vaults at Savannah River Site: A case study

    International Nuclear Information System (INIS)

    Ahmad, M.; McVay, C.; Venkatesh, S.

    1994-01-01

    Low Level radioactive Waste (LLW) at the Savannah River Site at Aiken, South Carolina, has traditionally been disposed of using engineered trenches in accordance with the guidelines and technology existing at the time. Recently, subgrade concrete vaults known as E-Area Vaults (EAV) have been constructed at SRS. The EAV project is a comprehensive effort for upgrading LLW disposal at SRS based on meeting the requirements of current Department of Energy (DOE) Orders, and addressing more stringent federal and state regulations. The EAV is a first of its kind state-of-the-art facility designed and built in the United States to receive LLW. Westinghouse Savannah River Company (WSRC) conducted an Operational Readiness Review (ORR) of the vaults prior to startup. The objective of the EAV ORR was to perform a comprehensive review of the operational readiness of the facilities per DOE guidelines including Defense Nuclear Facilities Safety Board (DNFSB) recommendations. This review included assessing construction of the vaults as per design, adequate approved procedures, and training of all the personnel associated with the facility operations. EAV ORR incorporated the lessons learned from other DOE ORRs, included DNFSB recommendations, used a graded approach, and utilized subject matter experts for each functional area of assessment

  2. Operational Readiness Review Implementation Plan for the K Basin Fuel Transfer System

    International Nuclear Information System (INIS)

    DAVIES, T.H.

    2002-01-01

    This implementation plan has been prepared to comply with the requirements of U.S. Department of Energy (DOE) Order 425.1A, Startup and Restart of Nuclear Facilities, and DOE-STD-3006-2000, Planning and Conduct of Operational Readiness Reviews (ORR) (DOE 2002). The scope of the ORR is described in the contractor K Basin Fuel Transfer System (FTS) Plan of Action (POA), which was prepared by Spent Nuclear Fuel (SNF) Project line management and approved by the DOE Richland Operations Office (RL) Manager on April 4, 2002 (FH 2002a). While the Project Hanford Management Contractor has been revised to include DOE Order 425.1B, the contractor implementing procedure, ''F-PRO-055, Startup Readiness (Revision 9) has not yet been approved by RL for contractor use. Appendix A provides a crosswalk between the requirements of DOE Order 425.1A and DOE Order 425.1B to show that all requirements of DOE 425.1B are covered by this implementation plan. DOE Order 425.1B indicates that the Secretarial Officer is the Authorization Authority when substantial modifications are made to a Hazard Category 2 nuclear facility. This Authorization Authority has been delegated to the RL Manager by memorandum from Jessie Hill Roberson, dated November 20, 2001 (Roberson 2001). The scope of the ORR is described in the RL Plan of Action, K Basin Fuel Transfer System, prepared by DOE project line management and approved by the RL Manager, the designated approval authority, on September 12, 2002 (Schlender 2002). This implementation plan provides the overall approach and guidelines for performance of the DOE ORR. Appendix B contains the Criteria and Review Approach Documents (CRAD), which define the review objectives and criteria as well as the approach for assessing each objective. ORR results will be published in a final report, as discussed in Section 9.4

  3. Operational readiness of filtered air discharge monitoring systems

    International Nuclear Information System (INIS)

    Lafortune, J.F.; Jamieson, T.J.

    1993-08-01

    An assessment of the operational readiness of the Filtered Air Discharge (FAD) Stack Monitoring systems, installed in Canadian CANDU nuclear power plants, was performed in this project. Relevant Canadian and foreign standards and regulatory requirements have been reviewed and documentation on FAD stack monitoring system design, operation, testing and maintenance have been assessed to identify likely causes and potential failures of FAD stack monitoring systems and their components under both standby and accident conditions. Recommendations have also been provided in this report for design and performance review guidelines for CANDU stations. A case study of the FAD stack monitoring system at Pickering NGS is also documented in this report

  4. Readiness Review of BWXT for Fabrication of AGR 5/6/7 Compacts

    Energy Technology Data Exchange (ETDEWEB)

    Marshall, Douglas William [Idaho National Lab. (INL), Idaho Falls, ID (United States); Sharp, Michelle Tracy [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2017-02-01

    In support of preparations for fabricating compacts for the Advanced Gas Reactor (AGR) fuel qualification irradiation experiments (AGR-5/6/7), Idaho National Laboratory (INL) conducted a readiness review of the BWX Technology (BWXT) procedures, processes, and equipment associated with compact fabrication activities at the BWXT Nuclear Operations Group (BWXT-NOG) facility outside Lynchburg, VirginiaVA. The readiness review used quality assurance requirements taken from the American Society of Mechanical Engineers (ASME) Nuclear Quality Assurance Standard (NQA-1-2008/1a-2009) as a basis to assess readiness to start compact fabrication.

  5. Readiness factors for lean implementation in healthcare settings--a literature review.

    Science.gov (United States)

    Al-Balushi, S; Sohal, A S; Singh, P J; Al Hajri, A; Al Farsi, Y M; Al Abri, R

    2014-01-01

    The purpose of this paper is to determine the readiness factors that are critical to the application and success of lean operating principles in healthcare organizations through a review of relevant literature. A comprehensive review of literature focussing on lean and lean healthcare was conducted. Leadership, organizational culture, communication, training, measurement, and reward systems are all commonly attributed readiness factors throughout general change management and lean literature. However, directly related to the successful implementation of lean in healthcare is that a setting is able to authorize a decentralized management style and undertake an end-to-end process view. These can be particularly difficult initiatives for complex organizations such as healthcare settings. The readiness factors identified are based on a review of the published literature. The external validity of the findings could be enhanced if tested using an empirical study. The readiness factors identified will enable healthcare practitioners to be better prepared as they begin their lean journeys. Sustainability of the lean initiative will be at stake if these readiness factors are not addressed. To the best of the knowledge, this is the first paper that provides a consolidated list of key lean readiness factors that can guide practice, as well as future theory and empirical research.

  6. Readiness review plan for the in situ vitrification demonstration of Seepage Pit 1 in Waste Area Grouping 7

    International Nuclear Information System (INIS)

    1995-05-01

    A treatability study is planned that encompasses the application of in situ vitrification (ISV) to at least two segments of the Oak Ridge National Laboratory Seepage Pit I during the third quarter of fiscal year 1995. Before the treatability study can be initiated, the proposed activity must be subjected to an Operational Readiness Review (ORR). ORR is a structured methodology of determining readiness to proceed as outlined in Martin Marietta Energy Systems, Inc. (Energy Systems), Environmental Restoration Waste Management Procedure ER/C-P1610, which provides Energy Systems organizations assurance that the work to be performed is consistent with management's expectations and that the subject activity is ready to proceed safely. The readiness review plan provides details of the review plan overview and the scope of work to be performed. The plan also identifies individuals and position responsibilities for implementing the activity. The management appointed Readiness Review Board (RRB) has been identified. A Field Readiness Review Team (FRT), a management appointed multidisciplinary group, has been established (1) to evaluate the ISV treatability study, (2) to identify and assemble supporting objective evidences of the readiness to proceed, and (3) to assist the team leader in presenting the evidences to the RRB. A major component of RRB is the formulation of readiness review criteria months before the operation. A comprehensive readiness review tree (a positive logic tree) is included, which identifies the activities required for the development of the readiness criteria. The readiness review tree serves as a tool to prevent the omission of an item that could affect system performance. All deficiencies identified in the review will be determined as prestart findings and must be resolved before the project is permitted to proceed. The final approval of the readiness to proceed will be the decision of RRB

  7. Readiness Assessment Plan, Hanford 200 areas treated effluent disposal facilities

    International Nuclear Information System (INIS)

    Ulmer, F.J.

    1995-01-01

    This Readiness Assessment Plan documents Liquid Effluent Facilities review process used to establish the scope of review, documentation requirements, performance assessment, and plant readiness to begin operation of the Treated Effluent Disposal system in accordance with DOE-RLID-5480.31, Startup and Restart of Facilities Operational Readiness Review and Readiness Assessments

  8. Readiness evaluation report for operation of the 200-ZP-1 pump-and-treat system

    International Nuclear Information System (INIS)

    Lehrschall, R. R.

    1996-07-01

    The 200-ZP-1 Readiness Evaluation Team has completed a readiness evaluation (RE) of the 200-ZP-1 Interim Remedial Measure. During the RE process, other Environmental Restoration Contractor and Hanford Site project activities were assessed (i.e., using lessons learned reviews) for applicability to the 200-ZP-1 RE. Nine additional areas were discovered to be applicable to the 200-ZP-1 IRM and were incorporated into the RE process as functional readiness requirements. The goal of the 200-ZP-1 Operable Unit IRM is to reduce further migration of the carbon tetrachloride, chloroform, and trichloroethylene in the groundwater of the 200 West Area. The IRM treatment system has been designed to initiate hydraulic containment of the contaminant mass in the high-concentration portion of the CCl 4 plume

  9. Remedial action and waste disposal project - ERDF readiness evaluation plan

    International Nuclear Information System (INIS)

    Casbon, M.A.

    1996-06-01

    This Readiness Evaluation Report presents the results of the project readiness evaluation to assess the readiness of the Environmental Restoration and Disposal Facility. The evaluation was conducted at the conclusion of a series of readiness activities that began in January 1996. These activities included completion of the physical plant; preparation, review, and approval of operating procedures; definition and assembly of the necessary project and operational organizations; and activities leading to regulatory approval of the plant and operating plans

  10. Decommissioning project readiness reviews at the Department of Energy's Hanford, Washington, Site

    International Nuclear Information System (INIS)

    Speer, D.R.; Holmes, P.A.

    1987-01-01

    Two Hanford Site contractors independently formulated readiness review methods to prepare for decontamination and decommissioning (D and D) projects. One readiness review method provided an independent management review process. The other method provided a review by personnel directly involved in the project and concise documentation procedures. A unified system is now used at Hanford which combines the best aspects of both readiness review methods. The unified method assigns category levels based on certain job characteristics. The category assigned to the project then indicates the required level of management review prior to proceeding with the D and D project. In addition, the concise documentation procedures are now used for all category levels

  11. Readiness for hospital discharge: A concept analysis.

    Science.gov (United States)

    Galvin, Eileen Catherine; Wills, Teresa; Coffey, Alice

    2017-11-01

    To report on an analysis on the concept of 'readiness for hospital discharge'. No uniform operational definition of 'readiness for hospital discharge' exists in the literature; therefore, a concept analysis is required to clarify the concept and identify an up-to-date understanding of readiness for hospital discharge. Clarity of the concept will identify all uses of the concept; provide conceptual clarity, an operational definition and direction for further research. Literature review and concept analysis. A review of literature was conducted in 2016. Databases searched were: Academic Search Complete, CINAHL Plus with Full Text, PsycARTICLES, Psychology and Behavioural Sciences Collection, PsycINFO, Social Sciences Full Text (H.W. Wilson) and SocINDEX with Full Text. No date limits were applied. Identification of the attributes, antecedents and consequences of readiness for hospital discharge led to an operational definition of the concept. The following attributes belonging to 'readiness for hospital discharge' were extracted from the literature: physical stability, adequate support, psychological ability, and adequate information and knowledge. This analysis contributes to the advancement of knowledge in the area of hospital discharge, by proposing an operational definition of readiness for hospital discharge, derived from the literature. A better understanding of the phenomenon will assist healthcare professionals to recognize, measure and implement interventions where necessary, to ensure patients are ready for hospital discharge and assist in the advancement of knowledge for all professionals involved in patient discharge from hospital. © 2017 John Wiley & Sons Ltd.

  12. Operational readiness decisions at nuclear power plants - part 2. Which factors influence the decisions?

    International Nuclear Information System (INIS)

    Kecklund, Lena; Petterson, Sara

    2008-04-01

    The first report contained a summary of relevant research of decision making, a case study at Ringhals power plant and an analysis of some real cases of operational readiness decisions. In this report two case studies in the Swedish power plants, OKG and Forsmark are presented. The case study description consists of three parts; a description of the support from the management system for the decision making process, interviews with decision makers and an analysis of real cases of operational readiness decisions. The purpose of the project has been to increase the understanding of the decision process in operational readiness decisions as well as the support given from the management system and what factors influence the decisions. From a general point of view the circumstances where the decision must be taken varies, but situations and events that lead to questioning of the operational readiness are often easy to identify. There are often support documents such as procedures, rules and technical documents which specify operational limitations which give explicit decision criteria. These decisions are easy. When needed colleagues can be consulted for support. In unclear situations and/or when the technical criteria is not clear, e.g. when the rules and regulations are vague or even in conflict or when it is not evident that you need to question the operational readiness, the decision is more difficult to make. The results from the study shows that such decisions in general are not made by the shift crew manager but handed over to the next management level. The decision making process differs between the power plants. At one of the power plants the decision process is organised in specific meetings where decision made are reviewed by the next higher management level. At another plant the decisions are often made in groups or in consultation with colleagues. The management system makes a distinction between decisions made in consultation and when decisions already

  13. Operational readiness review for the TSCA incinerator start-up at the Oak Ridge K-25 site

    International Nuclear Information System (INIS)

    Jordan, Elizabeth A.; Murray, Alexander P.; Kiang, Peter M.

    1992-01-01

    The Department of Energy (DOE) Toxic Substances Control Act (TSCA) incinerator at Oak Ridge K-25 Site was designed in the early 1980's as a treatment alternative for the increasing quantities of radioactive mixed waste accumulating from gaseous diffusion plant (GDP) operations. The waste feed principally contains low assay uranium and PCBs, although listed solvents and heavy metal containing sludges have also be incinerated. Construction was completed in 1986 and the unit underwent an extensive series of tests and trial burns, because of the following unique characteristics: the incinerator treats radioactive mixed wastes; increased size of the incinerator for greater waste throughout and treatment capacity; expansion of the waste acceptance criteria to include materials and radionuclides from non-GDP operations, such as ORNL and Y-12; modifications and improvement to the Air Pollution Control (APC) system; treatment of large quantities and concentrations of PCB containing materials; projected longevity of operation (40 years); humid, Eastern location with a high, annual precipitation. The incinerator was initially fired in July, 1986. The full performance testing (with the APC) and DOE acceptance of the facility occurred a year later. The trial burn period lasted from 1988 through 1990. Numerous equipment problems were initially encountered, including excessive draft fan wear and failure. These problems have been overcome, the facility is fully permitted, DOE provided authorization for full operations in 1991, and, to date, over two million pounds of mixed waste have been incinerated, with an average volume reduction factor of approximately nine. This paper discusses the Office of Environmental Restoration and Waste Management Readiness Review for the incinerator. (author)

  14. EG&G Florida, Inc., KSC base operations contractor Launch Readiness Assessment System

    Science.gov (United States)

    Geaslen, W. D.

    1988-01-01

    A computerized Launch Readiness Assessment System (LRAS) which compares 'current status' of readiness against the 'required status' of readiness for the Space Shuttle. The five subsystems of the LRAS are examined in detail. The LRAS Plan specifies the overall system requirements, procedures, and reports. The LRAS Manager drives the operation of the LRAS system. The Responding Units (RU) maintain support plans and procedures which specify the detail requirements for each mission or milestone. The Master Data Tables contain the milestone, responsible RU relationships, and requirements assessment categories. The LRAS Status System serves as the launch readiness assessment reporting system. The relationships between these subsystems are displayed in diagrams.

  15. Control area readiness audit report of the Independent Electricity Market Operator (IMO)

    International Nuclear Information System (INIS)

    Gladish, L.A.; Campoli, G.; Le, Q.; Farrokhpay, S.; Kirby, B.; Penwell, C.; Weaver, S.; Vicini, D.; Wells, M.

    2004-01-01

    The Independent Electricity Market Operator (IMO) is a control area authority that is responsible for the safe and reliable operation of its portion of the bulk electric system in cooperation with neighbouring control areas. This audit by the North American Electric Reliability Council (NERC) reviewed the readiness of Ontario's IMO to meets its responsibilities as a control area operator. NERC recommended specific actions to correct the deficiencies that resulted in the blackout in southeastern Ontario and northeastern United States on August 14, 2003. Initiatives to strengthen compliance with existing standards were also suggested along with longer-term technical initiatives to prevent or mitigate the impacts of cascading blackouts in the future. The audit process included: a self-assessment questionnaire to the control area being audited; a questionnaire to neighbouring control areas; a questionnaire to the reliability coordinator and an on-site audit by a selected audit team. The following issues were reviewed: criteria and compliance, authority, responsibilities in the planning time frame, real time monitoring, system restoration, delegation of reliability coordinator functions, outage coordination, transmission and generation relaying, energy emergency plan, operating policy, line clearances, and nuclear power plant requirements. It was concluded that the IMO has the necessary plans, procedures, processes, tools and trained personnel to respond to emergency events. The audit did not find any major operational problems, but offered a few recommendations for improvement. tabs

  16. Factors related to nursing students' readiness to enter working life - A scoping literature review.

    Science.gov (United States)

    Järvinen, Tiina; Eklöf, Niina; Salminen, Leena

    2018-03-01

    The aim of this scoping literature review was to identify the factors related to nursing students' readiness to enter working life. The literature search was carried out in autumn 2017 in PubMed and CINAHL databases. The studies selected for this review (n = 17) were analyzed thematically with inductive content analysis. Four subthemes that were combined into two main factors related to nursing students' readiness to enter working life were found. The main factors found were 1) educational factors and 2) personal factors. Educational factors consisted of professional competence and clinical practice, while personal factors consisted of nursing students' background and feelings. Some nursing students tend to feel insecure about entering working life as a newly graduated nurse. This literature review also supports the importance of clinical practice periods in nursing education and for readiness for working life. Nurse education needs to ensure clinical practice periods which support nursing students' professional growth. Further research is needed on how the factors related to nursing students' readiness to enter working life correlate with each other. Particularly, the association between competence, readiness and positive feelings towards graduation needs further investigation. Copyright © 2018 Elsevier Ltd. All rights reserved.

  17. Readiness evaluation plan for operation of the 200-ZP-1 pump-and-treat system

    International Nuclear Information System (INIS)

    Lehrschall, R.R.

    1996-03-01

    The Project Readiness Evaluation (RE) process will show that the 200-ZP-1 Phase 2 and Phase 3 Interim Response Measure (IRM) remedial activity is prepared to safely and effectively commence work activities. In order to ensure readiness to commence the 200-ZP-1 Pump-and-Treat (P and T) activities, a formal RE will be performed in accordance with this plan. A Readiness Evaluation Team (RET) will evaluate and confirm readiness by reviewing the work activities and by conducting field verifications. The Project Final Hazard Classification (FHC) prepared for the 200-ZP-1 P and T IRM has determined that the operation is a Non-Nuclear Low Hazard activity. The goal of this IRM is to reduce further migration of the carbon tetrachloride, chloroform, and trichloroethylene (TCE) in the groundwater of the 200 West Area. The Phase 2 and Phase 3 IRM treatment system will be designed to initiate hydraulic containment of the contaminant mass in the high-concentration portion (i.e., the 2,000- to 3,000-ppb contour) of the CCl 4 plume. This system will be located just north of the Plutonium Finishing Plant in the 200 West Area and will utilize air stripping and vapor-phase granular activated carbon (GAC) adsorption of the CCl 4 . Air stripping is performed by forcing clean air through the contaminated groundwater stream. Based on chemical equilibrium, volatile organic compounds are transferred from the groundwater stream into the air stream. The air stream, containing the contamination in vapor phase, will be passed through vapor-phase GAC columns to remove and collect the organic contaminants. Saturated GAC will then be shipped offsite for carbon regeneration, where the contamination will be destroyed at a permitted facility

  18. Organizational readiness for knowledge translation in chronic care: a review of theoretical components

    Science.gov (United States)

    2013-01-01

    Background With the persistent gaps between research and practice in healthcare systems, knowledge translation (KT) has gained significance and importance. Also, in most industrialized countries, there is an increasing emphasis on managing chronic health conditions with the best available evidence. Yet, organizations aiming to improve chronic care (CC) require an adequate level of organizational readiness (OR) for KT. Objectives: The purpose of this study is to review and synthesize the existing evidence on conceptual models/frameworks of Organizational Readiness for Change (ORC) in healthcare as the basis for the development of a comprehensive framework of OR for KT in the context of CC. Data sources We conducted a systematic review of the literature on OR for KT in CC using Pubmed, Embase, CINAHL, PsychINFO, Web of Sciences (SCI and SSCI), and others. Search terms included readiness; commitment and change; preparedness; willing to change; organization and administration; and health and social services. Study selection: The search was limited to studies that had been published between the starting date of each bibliographic database (e.g., 1964 for PubMed) and November 1, 2012. Only papers that refer to a theory, a theoretical component from any framework or model on OR that were applicable to the healthcare domain were considered. We analyzed data using conceptual mapping. Data extraction: Pairs of authors independently screened the published literature by reviewing their titles and abstracts. Then, the two same reviewers appraised the full text of each study independently. Results Overall, we found and synthesized 10 theories, theoretical models and conceptual frameworks relevant to ORC in healthcare described in 38 publications. We identified five core concepts, namely organizational dynamics, change process, innovation readiness, institutional readiness, and personal readiness. We extracted 17 dimensions and 59 sub-dimensions related to these 5 concepts

  19. Organizational readiness for knowledge translation in chronic care: a review of theoretical components.

    Science.gov (United States)

    Attieh, Randa; Gagnon, Marie-Pierre; Estabrooks, Carole A; Légaré, France; Ouimet, Mathieu; Roch, Geneviève; Ghandour, El Kebir; Grimshaw, Jeremy

    2013-11-28

    With the persistent gaps between research and practice in healthcare systems, knowledge translation (KT) has gained significance and importance. Also, in most industrialized countries, there is an increasing emphasis on managing chronic health conditions with the best available evidence. Yet, organizations aiming to improve chronic care (CC) require an adequate level of organizational readiness (OR) for KT. The purpose of this study is to review and synthesize the existing evidence on conceptual models/frameworks of Organizational Readiness for Change (ORC) in healthcare as the basis for the development of a comprehensive framework of OR for KT in the context of CC. We conducted a systematic review of the literature on OR for KT in CC using Pubmed, Embase, CINAHL, PsychINFO, Web of Sciences (SCI and SSCI), and others. Search terms included readiness; commitment and change; preparedness; willing to change; organization and administration; and health and social services. The search was limited to studies that had been published between the starting date of each bibliographic database (e.g., 1964 for PubMed) and November 1, 2012. Only papers that refer to a theory, a theoretical component from any framework or model on OR that were applicable to the healthcare domain were considered. We analyzed data using conceptual mapping. Pairs of authors independently screened the published literature by reviewing their titles and abstracts. Then, the two same reviewers appraised the full text of each study independently. Overall, we found and synthesized 10 theories, theoretical models and conceptual frameworks relevant to ORC in healthcare described in 38 publications. We identified five core concepts, namely organizational dynamics, change process, innovation readiness, institutional readiness, and personal readiness. We extracted 17 dimensions and 59 sub-dimensions related to these 5 concepts. Our findings provide a useful overview for researchers interested in ORC and aims

  20. Integrative Literature Review: Ascertaining Discharge Readiness for Pediatrics After Anesthesia.

    Science.gov (United States)

    Whitley, Deborah R

    2016-02-01

    Unplanned hospital readmissions after the administration of general anesthesia for ambulatory procedures may contribute to loss of reimbursement and assessment of financial penalties. Pediatric patients represent a unique anesthetic risk. The purpose of this integrative literature review was to ascertain specific criteria used to evaluate discharge readiness for pediatric patients after anesthesia. This study is an integrative review of literature. An integrative literature search was conducted and included literature sources dated January 2008 to November 2013. Key words included pediatric, anesthesia, discharge, criteria, standards, assessment, recovery, postoperative, postanesthesia, scale, score, outpatient, and ambulatory. Eleven literature sources that contributed significantly to the research question were identified. Levels of evidence included three systematic reviews, one randomized controlled trial, three cohort studies, two case series, and two expert opinions. This integrative literature review revealed evidence-based discharge criteria endorsing home readiness for postanesthesia pediatric patients should incorporate consideration for physiological baselines, professional judgment with regard to infant consciousness, and professional practice standards/guidelines. Additionally, identifying and ensuring discharge to a competent adult was considered imperative. Nurses should be aware that frequently used anesthesia scoring systems originated in the 1970s, and this review was unable to locate current literature examining the reliability and validity of their use in conjunction with modern anesthesia-related health care practices. Copyright © 2016 American Society of PeriAnesthesia Nurses. Published by Elsevier Inc. All rights reserved.

  1. Safety review of experiments at Albuquerque Operations Office

    International Nuclear Information System (INIS)

    Elliott, K.

    1984-01-01

    The Department of Energy (DOE) Albuquerque Operations Office is responsible for the safety overview of nuclear reactor and critical assembly facilities at Sandia National Laboratories, Los Alamos National Laboratory, and the Rocky Flats Plant. The important safety concerns with these facilities involve the complex experiments that are performed, and that is the area emphasized. A determination is made by the Albuquerque Office (AL) with assistance from DOE/OMA whether or not a proposed experiment is an unreviewed safety question. Meetings are held with the contractor to resolve and clarify questions that are generated during the review of the proposed experiment. The AL safety evaluation report is completed and any recommendations are discussed. Prior to the experiment a preoperational appraisal is performed to assure that personnel, procedures, and equipment are in readiness for operations. During the experiment, any abnormal condition is reviewed in detail to determine any safety concerns

  2. Readiness factors for information system strategic planning among universities in developing countries: a systematic review

    Science.gov (United States)

    Irfan, M.; Putra, S. J.; Alam, C. N.; Subiyakto, A.; Wahana, A.

    2018-03-01

    The implementation of information system strategic planning (ISSP) in higher education institutions is to improve work efficiency, management effectiveness in order to improve organizational competitive advantage. However, the question of whether all universities are ready to implement ISSP as a way to achieve organizational goals has not been answered. This study aims to investigate the readiness phenomena through literature study. The method used is by using the Systematic Literature Review (SLR) instrument to identify readiness factors on the implementation of ISSP, especially among the institutions of higher education in developing countries. This study has identified 10 readiness measurement. There are three categories of measurement, namely people, processes and technologies that represent 11 factors of ISSP readiness measurement in universities.

  3. Readiness Review Plan for the Interim Remedial Action on Surface Debris in Waste Area Grouping 11 at Oak Ridge National Laboratory, Oak Ridge, TN

    International Nuclear Information System (INIS)

    1993-10-01

    This Readiness Review Plan was prepared by the Waste Area Grouping (WAG) 11 Site Project Readiness Review Team as an overview of the Interim Remedial Action on Surface Debris in WAG 11 project at Oak Ridge National Laboratory, including major readiness milestones, criteria development methodology, and a list of events to occur as part of the review process for determining readiness for each project phase

  4. Assessment of nonintrusive methods for monitoring the operational readiness of solenoid-operated valves

    International Nuclear Information System (INIS)

    Kryter, R.C.

    1988-01-01

    Solenoid-operated valves (SOVs) are being studied at Oak Ridge National Laboratory as part of the USNRC Nuclear Plant Aging Research (NPAR) Program. The primary objective of the study is to identify and recommend methods for inspection, surveillance, and maintenance of SOVs that can ensure their operational readiness-- that is, their ability to perform required safety functions under all anticipated operating conditions. An earlier (Phase I) study described SOV failure modes and causes and identified measurable parameters that might be used to monitor the various degradations that lead to functional failure. The present (Phase II) study focuses on devising and then demonstrating the effectiveness of techniques and/or equipment with which to measure the previously identified performance parameters and thus detect and trend the progress of any degradation. Several nonintrusive techniques are currently under investigation. Recent experimental results which demonstrate the feasibility and practicality of the techniques being studied are presented. 4 refs., 6 figs., 2 tabs

  5. An examination of the Marine Operating and Support Information System (MOSIS) as a mechanism for linking resources to readiness for Marine Operating Forces

    OpenAIRE

    Cucinotta, Paul D.

    1997-01-01

    Approved for public release; distribution is unlimited Continued downsizing efforts have imposed increasingly stringent restrictions on Department of Defense budgetary resources. Program and activity managers are expected to justify their budgets based on well defined quantitative measures of performance, activity level and readiness. This thesis examines the resources to readiness issues in DoD, specifically focusing on Marine Corps Operating Forces. Additionally, this thesis evaluates th...

  6. CORR Guidelines. Preparing and Conducting Review Missions of Construction Project Readiness for Nuclear Power Plants

    International Nuclear Information System (INIS)

    2013-01-01

    The construction readiness review (CORR) mission for nuclear power plant projects has been established with the aim of conducting peer reviews of construction projects related to nuclear power plants. Such a mission provides a detailed assessment of readiness for construction, construction progress, readiness for turnover, as well as recommendations for improvement. Organizations in Member States, such as nuclear utilities, owners, regulators and technical support organizations, can benefit from such reviews. A team of international experts with complementing specialities will conduct the CORR mission. The review is based on appropriate IAEA publications, such as IAEA Safety Standards Series Guides and IAEA Nuclear Energy Series publications, as well as on internationally recognized project and construction management guides. Mission findings are summarized in a mission report, which includes a list of recommendations, suggestions and identified good practices. The review is not intended to be a regulatory inspection or an audit against international codes and standards. Rather, it is a peer review aimed at improving implementation processes and procedures through an exchange of technical experiences and practices at the working level. The mission is applicable at any stage of a nuclear power plant construction project, although two specific phases are targeted: (1) start of construction mission (Phase 1 mission) and (2) an in-progress mission (Phase 2 mission). Missions are initiated when official requests are submitted by Member States through the appropriate IAEA channels

  7. Results of readiness review for start of Title II Design of ESF in salt

    International Nuclear Information System (INIS)

    1986-01-01

    The Readiness Review Board recommends that the ESF Title II Design be initiated after approval of revised Functional Design Criteria for Title II design. This review was conducted assuming a Deaf Smith location for ESF. Seventy-four open items and eight technical holds were identified during the Readiness Review that must be addressed and resolved to ensure successful completion of the ESF Title II Design. These items include definition and approval of surface based, EDH, and subsurface testing requirements; development of an approved OCRWM/SRPO licensing position for the ESF; and acquisition and availability of site-specific confirmatory data. A Risk Assessment should be conducted to define corrective action data and technical, cost and schedule impacts and associated program risks of continuation of Title II design activities beyond those dates

  8. The tokamak fusion test reactor tritium systems test contractor operational readiness review

    International Nuclear Information System (INIS)

    Gentile, C.A.; Levine, J.; Norris, M.; Rehill, F.; Such, C.

    1993-01-01

    In preparation for D-T operations at TFTR, the TFTR project has successfully completed the C-ORR process which has led to the introduction of 200 curies of tritium to the site. Preparations for the C-ORR began approximately 2 years ago. During July 1992 a one-week Site Assistance Review was conducted by the C-ORR , and C-ORR Team consisting of 12 persons, all of whom were outside experts, many of whom were from other facilities within the DOE complex. During the July 1992 Site Assistance Review 201 findings were documented which fell into one of three categories. All of the 109 category one findings which were generated were required to be resolved prior to the introduction of tritium to the TFTR site. On April 5, 1993, the TFTR Tritium System Test C-ORR commenced. The results of the C-ORR as documented in the final report by the C-ORR was that category 1 findings were resolved, and it was the recommendation of the C-ORR Team to the PPPL ES ampersand H Board that TFTR initiate the Tritium Systems Test. DOE (Chicago Operations, Princeton Area Office) concurred with the C-ORR final report and on April 29, 1993, at 12:15 pm tritium was introduced to the TFTR site

  9. Naval Readiness, Operational Training, and Environmental Protection: Achieving an Appropriate Balance between Competing National Interests

    Science.gov (United States)

    1988-06-01

    Readiness: Operational Traininz; Polution 19 ABSTRACT (Continue on reverse if necessary and identify by block number) This paper describes the...materials, radioactive materials, heat. wrecked or discarded equipment, rock, sand, cellar dirt and industrial, municipal, and agricultural waste

  10. Acoustics Critical Readiness Review

    Science.gov (United States)

    Ballard, Kenny

    2010-01-01

    This presentation reviews the status of the acoustic equipment from the medical operations perspective. Included is information about the acoustic dosimeters, sound level meter, and headphones that are planned for use while on orbit. Finally there is information about on-orbit hearing assessments.

  11. Operational readiness decisions at nuclear power plants. Which factors influence the decisions?

    International Nuclear Information System (INIS)

    Kecklund, Lena; Petterson, Sara

    2007-11-01

    The purpose of this project has been to propose a model for how operational readiness decisions are made and to identify important factors influencing these decisions. The project has also studied the support from the management system for decision making, and made a comparison to how decisions are made in practice. This is mainly an explorative study, but it also deals with relevant research and theories about decision making. The project consists of several parts. The first part is composed of descriptions of important notations and terms, and a summary of relevant research about decision making and its relation to the management system. The project proposes a model for the decision making process. The second part consists of analyses of reports from SKI about operational readiness decisions. The last part is a case study at a nuclear power plant. The case study describes the support from work method theories at the nuclear power plant to the decision maker. Decision makers with different roles in the safety management system were interviewed to give a description of the decision making process and of factors influencing the decisions made in practice. The case study also consists of an analysis of decisions in some real events at the nuclear power plant, as well as of making interviews in connection with these. To sum up, this report presents a model for the decision process and describes the work method theories that support the different parts in the process, how the different parts are applied in practice and circumstances that influence the decision process. The results of the project give an understanding for decision making in operational readiness decisions and the factors that influence the decision. The results are meant to be used as a basis for further studies in other nuclear power plants. The results indicate that the decision process is facilitated if there are clear criteria and work methods, if the work methods are well established and if the

  12. Military Readiness: DODs Readiness Rebuilding Efforts May Be at Risk without a Comprehensive Plan

    Science.gov (United States)

    2016-09-01

    specific elements that are to be in strategic plans. 8Chairman of the Joint Chiefs of Staff Guide 3401D, CJCS Guide to the Chairman’s Readiness ...all its major functions and operations. DOD strategic guidance makes it clear that rebuilding readiness is a priority that supports the... readiness recovery efforts. Evaluations of the plan to monitor goals and objectives Assessments, through objective measurement and systematic

  13. Cognitive Readiness

    National Research Council Canada - National Science Library

    Morrison, John

    2002-01-01

    Cognitive readiness is described as the mental preparation an individual needs to establish and sustain competent performance in the complex and unpredictable environment of modern military operations...

  14. Market readiness report : status of preparation for Ontario's competitive retail electricity market

    International Nuclear Information System (INIS)

    2002-01-01

    The Ontario Energy Board (OEB) assumes a leadership role in the electricity sector to ensure the readiness of retail participants in Ontario's competitive electricity market. The Market Readiness Project Team is instrumental in this activity. The team, led by the Independent Electricity Market Operator, provides information and advice regarding the technical readiness of the retail industry, with particular focus on the readiness of distributors to carry out their important functions in a competitive market. This report provides an assessment of the team regarding the industry's technical readiness based on information as of December 14, 2001. The status of retail market readiness was reviewed in terms of the viability of the design of the new competitive market and on the status of Ontario distributors in enabling a competitive market. The workplan for the remaining industry activities needed to achieve market opening were then summarized along with the contingency arrangements for any distributors that are not ready for market opening. Based on several projections, an estimated 88 per cent of Ontario contracts will be served by a distributor starting on a May 1, 2002 market opening. tabs., figs., appendices

  15. River Protection Project (RPP) Readiness-to-Proceed 2 Internal Independent Review Team Final Report

    International Nuclear Information System (INIS)

    SCHAUS, P.S.

    2000-01-01

    This report describes the results of an independent review team brought in to assess CH2M HILL Hanford's readiness and ability to support the RPP's move into its next major phase - retrieval and delivery of tank waste to the Privatization Contractor

  16. River Protection Project (RPP) Readiness-to-Proceed 2 Internal Independent Review Team Final Report

    International Nuclear Information System (INIS)

    SCHAUS, P.S.

    2000-01-01

    This report describes the results of an independent review team brought in to assess CH2M Hill Hanford Group's readiness and ability to support the RPP's move into its next major phase - retrieval and delivery of tank waste to the Privatization Contractor

  17. A review of the incidence and transmission of Listeria monocytogenes in ready-to-eat products in retail and food service environments.

    Science.gov (United States)

    Lianou, Alexandra; Sofos, John N

    2007-09-01

    Contamination of ready-to-eat products with Listeria monocytogenes may occur at several stages before consumption. Accessibility to the public and relatively limited control interventions at retail and food service establishments (compared with the processing sector of the food industry) and the lack of a specific regulatory framework increase the likelihood of introduction of this pathogen into some foods in these establishments. This review is a compilation of available information on the incidence and transmission of L. monocytogenes through ready-to-eat products at the retail and food service level. The potential transmission of L. monocytogenes within retail and food service operations has been indicated in epidemiological investigations and by survey data. Potential sources of the organism in these operations include the environment, food handlers, and incoming raw ingredients or processed products that have become contaminated after the lethality treatment at the manufacturing facility. L. monocytogenes may be present at retail and food service establishments in various ready-to-eat products, both prepackaged and those packaged in the store, and occasionally at high concentrations. This issue dictates the need for development and application of effective control measures, and potential control approaches are discussed here. Good manufacturing practices, appropriate cleaning, sanitation and hygiene programs, and temperature control required for prevention or inhibition of growth of the pathogen to high levels are critical for control of L. monocytogenes in the retail and food service sector. A comprehensive food safety system designed to be functional in retail and food service operations and based on the philosophy of hazard analysis and critical control point systems and a series of sound prerequisite programs can provide effective control of L. monocytogenes in these environments. However, competent delivery of food safety education and training to retail

  18. Effects of Ready-to-Eat-Cereals on Key Nutritional and Health Outcomes : A Systematic Review

    NARCIS (Netherlands)

    Priebe, Marion G.; McMonagle, Jolene R.

    2016-01-01

    Background In many countries breakfast cereals are an important component of breakfast. This systematic review assesses the contribution of consumption of ready-to eat cereal (RTEC) to the recommended nutrient intake. Furthermore, the effects of RTEC consumption on key health parameters are

  19. Management of Ready-to-Use Parenteral Nutrition in Newborns: Systematic Review.

    Science.gov (United States)

    Mena, Karen Daniela Romero; Espitia, Olga Lucia Pinzón; Vergara, José Alejandro Daza

    2018-04-27

    Parenteral support has increased the possibility of neonatal recovery. However, complications associated with its use have been documented. One commercial method developed to decrease the complications of this type of support is the ready-to-use parenteral nutrition (PN), a 3-chamber bag that provides a complete nutrient mix. This systematic review seeks, through the Preferred Reporting Items for Systematic Reviews and Meta-Analyses methodology, to establish the benefits in newborns. Seven databases and gray literature were used. The search was limited to publications from 2007-2017 and to articles written in English, Spanish, and Portuguese. Articles that did not meet the inclusion criteria and studies with low quality evaluated with the Scottish Intercollegiate Guidelines Network guidelines, which were without information about the study or analytical methods, were excluded. A total of 24,193 articles were obtained, which were initially evaluated by title and abstract according to the inclusion criteria. A total of 24,167 articles were discarded, obtaining 27 eligible for follow-up evaluation. After a detailed evaluation of the full text, 13 articles were selected. It was found that ready-to-use PN has the potential benefit to reduce the risks for infections, provide an adequate supply of nutrients, generate growth within the expected range, provide ease of use, decrease prescription errors, and potentially reduce costs. It is necessary to evaluate the short- and long-term impact of its use. © 2018 American Society for Parenteral and Enteral Nutrition.

  20. Application of signature analysis for determining the operational readiness of motor-operated valves under blowdown test conditions

    International Nuclear Information System (INIS)

    Haynes, H.D.

    1988-01-01

    In support of the NRC-funded Nuclear Plant Aging Research (NPAR) program, Oak Ridge National Laboratory (ORNL) has carried out a comprehensive aging assessment of Motor-Operated Valves (MOVs). As part of this work, ORNL participated in the Gate Valve Flow Interruption Blowdown (GVFIB) tests carried out in Huntsville, Alabama. The GVFIB tests were intended primarily to determine the behavior of motor-operated gate valves under the temperature, pressure, and flow conditions expected to be experienced by isolation valves in Boiling Water Reactors (BWRs) during a high energy line break (blowdown) outside of containment. In addition, the tests provided an excellent opportunity to evaluate signature analysis methods for determining the operational readiness of the MOVs under those accident conditions. ORNL acquired motor current and torque switch shaft angular position data on two test MOVs during various times of the GVFIB tests. The reduction in operating ''margin'' of both MOVs due to the presence of additional valve running loads imposed by high flow was clearly observed in motor current and torque switch angular position signatures. In addition, the effects of differential pressure, fluid temperature, and line voltage on MOV operations were observed and more clearly understood as a result of utilizing signature analysis techniques. 1 ref.; 16 figs

  1. Cognitive Readiness Assessment and Reporting: An Open Source Mobile Framework for Operational Decision Support and Performance Improvement

    Science.gov (United States)

    Heric, Matthew; Carter, Jenn

    2011-01-01

    Cognitive readiness (CR) and performance for operational time-critical environments are continuing points of focus for military and academic communities. In response to this need, we designed an open source interactive CR assessment application as a highly adaptive and efficient open source testing administration and analysis tool. It is capable…

  2. The Daily Operational Brief: Fostering Daily Readiness, Care Coordination, and Problem-Solving Accountability in a Large Pediatric Health Care System.

    Science.gov (United States)

    Donnelly, Lane F; Basta, Kathryne C; Dykes, Anne M; Zhang, Wei; Shook, Joan E

    2018-01-01

    At a pediatric health system, the Daily Operational Brief (DOB) was updated in 2015 after three years of operation. Quality and safety metrics, the patient volume and staffing assessment, and the readiness assessment are all presented. In addition, in the problem-solving accountability system, problematic issues are categorized as Quick Hits or Complex Issues. Walk-the-Wall, a biweekly meeting attended by hospital senior administrative leadership and quality and safety leaders, is conducted to chart current progress on Complex Issues. The DOB provides a daily standardized approach to evaluate readiness to provide care to current patients and improvement in the care to be provided for future patients. Copyright © 2017 The Joint Commission. Published by Elsevier Inc. All rights reserved.

  3. Universal School Readiness Screening at Kindergarten Entry

    Science.gov (United States)

    Quirk, Matthew; Dowdy, Erin; Dever, Bridget; Carnazzo, Katherine; Bolton, Courtney

    2018-01-01

    Researchers examined the concurrent and predictive validity of a brief (12-item) teacher-rated school readiness screener, the Kindergarten Student Entrance Profile (KSEP), using receiver operating characteristic (ROC) curve analysis to examine associations between (N = 78) children's social-emotional (SE) and cognitive (COG) readiness with…

  4. Dimensions of community and organizational readiness for change.

    Science.gov (United States)

    Castañeda, Sheila F; Holscher, Jessica; Mumman, Manpreet K; Salgado, Hugo; Keir, Katherine B; Foster-Fishman, Pennie G; Talavera, Gregory A

    2012-01-01

    Readiness can influence whether health interventions are implemented in, and ultimately integrated into, communities. Although there is significant research interest in readiness and capacity for change, the measurement of these constructs is still in its infancy. The purpose of this review was to integrate existing assessment models of community and organizational readiness. The database PubMed was searched for articles; articles, book chapters, and practitioner guides identified as references cited in the list of core articles. Studies were included if they met the following criteria: (1) Empirical research, (2) identified community or organizational readiness for innovative health programming in the study's title, purpose, research questions, or hypotheses, and (3) identified methods to measure these constructs. Duplicate articles were deleted and measures published before 1995 were excluded. The search yielded 150 studies; 13 met all criteria. This article presents the results of a critical review of 13 community and organizational readiness assessment models, stemming from articles, chapters, and practitioner's guides focusing on assessing, developing, and sustaining community and organizational readiness for innovative public health programs. Readiness is multidimensional and different models place emphasis on different components of readiness, such as (1) community and organizational climate that facilitates change, (2) attitudes and current efforts toward prevention, (3) commitment to change, and (4) capacity to implement change. When initiating the program planning process, it is essential to assess these four domains of readiness to determine how they apply to the nuances across different communities. Thus, community-based participatory research (CBPR) partnerships, in efforts to focus on public health problems, may consider using readiness assessments as a tool for tailoring intervention efforts to the needs of the community.

  5. Preparing for success: Readiness models for rural telehealth

    Directory of Open Access Journals (Sweden)

    Jennett P

    2005-01-01

    Full Text Available Background: Readiness is an integral and preliminary step in the successful implementation of telehealth services into existing health systems within rural communities. Methods and Materials: This paper details and critiques published international peer-reviewed studies that have focused on assessing telehealth readiness for rural and remote health. Background specific to readiness and change theories is provided, followed by a critique of identified telehealth readiness models, including a commentary on their readiness assessment tools. Results: Four current readiness models resulted from the search process. The four models varied across settings, such as rural outpatient practices, hospice programs, rural communities, as well as government agencies, national associations, and organizations. All models provided frameworks for readiness tools. Two specifically provided a mechanism by which communities could be categorized by their level of telehealth readiness. Discussion: Common themes across models included: an appreciation of practice context, strong leadership, and a perceived need to improve practice. Broad dissemination of these telehealth readiness models and tools is necessary to promote awareness and assessment of readiness. This will significantly aid organizations to facilitate the implementation of telehealth.

  6. Impact of Birth Preparedness and Complication Readiness Interventions on Birth with a Skilled Attendant : A Systematic Review

    NARCIS (Netherlands)

    Miltenburg, Andrea Solnes; Roggeveen, Yadira; Shields, Laura; van Elteren, Marianne; van Roosmalen, Jos; Stekelenburg, Jelle; Portela, Anayda

    2015-01-01

    Background Increased preparedness for birth and complications is an essential part of antenatal care and has the potential to increase birth with a skilled attendant. We conducted a systematic review of studies to assess the effect of birth preparedness and complication readiness interventions on

  7. E-health readiness assessment framework in iran.

    Science.gov (United States)

    Rezai-Rad, M; Vaezi, R; Nattagh, F

    2012-01-01

    Concept of e-readiness is used in many areas such as e-business, e-commerce, e-government, and e-banking. In terms of healthcare, e-readiness is a rather new concept, and is propounded under the title of E-healthcare. E-health readiness refers to the readiness of communities and healthcare institutions for the expected changes brought by programs related to Information and Communications Technology (lCT). The present research is conducted aiming at designing E-health Readiness Assessment Framework (EHRAF) in Iran. The e-health readiness assessment framework was designed based on reviewing literature on e-readiness assessment models and opinions of ICT and health experts. In the next step, Delphi method was used to develop and test the designed framework. Three questionnaires developed to test and modify the model while determining weights of the indices; afterward they were either sent to experts through email or delivered to them in face. The designed framework approved with 4 dimensions, 11 constituents and 58 indices. Technical readiness had the highest importance coefficient (0.256099), and the other dimensions were of the next levels of coefficient importance: core readiness (0.25520), social communication readiness (0.244658), and engagement readiness (0.244039). The framework presents the movement route and investment priorities in e-health in Iran. The proposed framework is a good instrument for measuring the e-readiness in health centers in Iran, and for identifying strengths and weaknesses of these centers to access ICT and its implementation for more effectiveness and for analyzing digital divide between them, as well.

  8. E-Health Readiness Assessment Framework in Iran

    Science.gov (United States)

    Rezai-Rad, M; Vaezi, R; Nattagh, F

    2012-01-01

    Background: Concept of e-readiness is used in many areas such as e-business, e-commerce, e-government, and e-banking. In terms of healthcare, e-readiness is a rather new concept, and is propounded under the title of E-healthcare. E-health readiness refers to the readiness of communities and healthcare institutions for the expected changes brought by programs related to Information and Communications Technology (lCT). The present research is conducted aiming at designing E-health Readiness Assessment Framework (EHRAF) in Iran. Methods: The e-health readiness assessment framework was designed based on reviewing literature on e-readiness assessment models and opinions of ICT and health experts. In the next step, Delphi method was used to develop and test the designed framework. Three questionnaires developed to test and modify the model while determining weights of the indices; afterward they were either sent to experts through email or delivered to them in face. Results: The designed framework approved with 4 dimensions, 11 constituents and 58 indices. Technical readiness had the highest importance coefficient (0.256099), and the other dimensions were of the next levels of coefficient importance: core readiness (0.25520), social communication readiness (0.244658), and engagement readiness (0.244039). Conclusion: The framework presents the movement route and investment priorities in e-health in Iran. The proposed framework is a good instrument for measuring the e-readiness in health centers in Iran, and for identifying strengths and weaknesses of these centers to access ICT and its implementation for more effectiveness and for analyzing digital divide between them, as well. PMID:23304661

  9. First Commercial US Mixed Waste Vitrification Facility: Permits, Readiness Reviews, and Delisting of Final Wasteform

    International Nuclear Information System (INIS)

    Pickett, J.B.; Norford, S.W.; Diener, G.A.

    1998-01-01

    Westinghouse Savannah River Co. (WSRC) contracted GTS Duratek (Duratek) to construct and operate the first commercial vitrification facility to treat an F-006 mixed (radioactive/hazardous) waste in the United States. The permits were prepared and submitted to the South Carolina state regulators by WSRC - based on a detailed design by Duratek. Readiness Assessments were conducted by WSRC and Duratek at each major phase of the operation (sludge transfer, construction, cold and radioactive operations, and a major restart) and approved by the Savannah River Department of Energy prior to proceeding. WSRC prepared the first 'Upfront Delisting' petition for a vitrified mixed waste. Lessons learned with respect to the permit strategy, operational assessments, and delisting from this 'privatization' project will be discussed

  10. Magnetic fusion: Environmental Readiness Document

    International Nuclear Information System (INIS)

    1981-03-01

    Environmental Readiness Documents are prepared periodically to review and evaluate the environmental status of an energy technology during the several phases of development of that technology. Through these documents, the Office of Environment within the Department of Energy provides an independent and objective assessment of the environmental risks and potential impacts associated with the progression of the technology to the next stage of development and with future extensive use of the technology. This Environmental Readiness Document was prepared to assist the Department of Energy in evaluating the readiness of magnetic fusion technology with respect to environmental issues. An effort has been made to identify potential environmental problems that may be encountered based upon current knowledge, proposed and possible new environmental regulations, and the uncertainties inherent in planned environmental research

  11. Individual Ready Reserve: It's Relevance in Supporting the Long War

    National Research Council Canada - National Science Library

    Chisholm, Shelley A

    2008-01-01

    ... in sustaining personnel readiness while supporting on going operations. In response to meeting these personnel readiness concerns, the Army Reserve will require the call-up of Soldiers currently serving in the IRR...

  12. Partnership readiness for community-based participatory research.

    Science.gov (United States)

    Andrews, Jeannette O; Newman, Susan D; Meadows, Otha; Cox, Melissa J; Bunting, Shelia

    2012-08-01

    The use of a dyadic lens to assess and leverage academic and community partners' readiness to conduct community-based participatory research (CBPR) has not been systematically investigated. With a lack of readiness to conduct CBPR, the partnership and its products are vulnerable. The purpose of this qualitative study was to explore the dimensions and key indicators necessary for academic and community partnership readiness to conduct CBPR. Key informant interviews and focus groups (n = 36 participants) were conducted with academic and community participants who had experiences with CBPR partnerships. A 'framework analysis' approach was used to analyze the data and generate a new model, CBPR Partnership Readiness Model. Antecedents of CBPR partnership readiness are a catalyst and mutual interest. The major dimensions of the CBPR Partnership Readiness Model are (i) goodness of fit, (ii) capacity, and (iii) operations. Preferred outcomes are sustainable partnership and product, mutual growth, policy and social and health impact on the community. CBPR partnership readiness is an iterative and dynamic process, partnership and issue specific, influenced by a range of environmental and contextual factors, amenable to change and essential for sustainability and promotion of health and social change in the community.

  13. What Are the Costs of Trauma Center Readiness? Defining and Standardizing Readiness Costs for Trauma Centers Statewide.

    Science.gov (United States)

    Ashley, Dennis W; Mullins, Robert F; Dente, Christopher J; Garlow, Laura; Medeiros, Regina S; Atkins, Elizabeth V; Solomon, Gina; Abston, Dena; Ferdinand, Colville H

    2017-09-01

    Trauma center readiness costs are incurred to maintain essential infrastructure and capacity to provide emergent services on a 24/7 basis. These costs are not captured by traditional hospital cost accounting, and no national consensus exists on appropriate definitions for each cost. Therefore, in 2010, stakeholders from all Level I and II trauma centers developed a survey tool standardizing and defining trauma center readiness costs. The survey tool underwent minor revisions to provide further clarity, and the survey was repeated in 2013. The purpose of this study was to provide a follow-up analysis of readiness costs for Georgia's Level I and Level II trauma centers. Using the American College of Surgeons Resources for Optimal Care of the Injured Patient guidelines, four readiness cost categories were identified: Administrative, Clinical Medical Staff, Operating Room, and Education/Outreach. Through conference calls, webinars and face-to-face meetings with financial officers, trauma medical directors, and program managers from all trauma centers, standardized definitions for reporting readiness costs within each category were developed. This resulted in a survey tool for centers to report their individual readiness costs for one year. The total readiness cost for all Level I trauma centers was $34,105,318 (avg $6,821,064) and all Level II trauma centers was $20,998,019 (avg $2,333,113). Methodology to standardize and define readiness costs for all trauma centers within the state was developed. Average costs for Level I and Level II trauma centers were identified. This model may be used to help other states define and standardize their trauma readiness costs.

  14. Management Prestart Review Phase 1 for the NIF Optics Assembly Building (OAB)

    International Nuclear Information System (INIS)

    Dragoo, V

    2000-01-01

    A Management Prestart Review (MPR) for the National Ignition Facility (NIF) Optics Assembly Building (OAB) was conducted from June, 2000, through October, 2000. This review was performed to determine readiness of the facility and management to transfer the facility from the construction to the commissioning and operations phase. This review process provides assurance that the appropriate line management is in place to effect the turnover. Completion and acceptance of this report constitutes a turnover of facility and equipment operational responsibility from the Beampath Infrastructure System Construction organization to the Assembly Installation and Refurbishment Operations (assembly equipment installation/activation and mechanical cleaning operations) and the Beampath Infrastructure System (BIS) Commissioning and Operations Organizations (conventional facility operations). The OAB MPR provides to the NIF Project Manager an independent, systematic assessment of: (1) Readiness of line management for the turnover to take place, (2) Completeness of the equipment and facility installation of the OAB, (3) Readiness of personnel to operate within the facility, and (4) Implementation and efficacy of key management control processes and procedures. The MPR process assures that the technical, cost, and schedule risk associated with the installation/activation of OAB special equipment, mechanical cleaning, and conventional facility operations within the OAB are evaluated and are acceptable. Specifically, the scope of the review addresses technical and operational attributes of the equipment and facility systems that have been determined to have significant project risk. This report implements the LLNL requirement that MPRs shall be conducted before all new facilities are brought into operation, Lawrence Livermore National Laboratory (LLNL) ES and H Manual (M-010), Section 2.2.5, Pre-Start Reviews. The MPR process is an essential part of the ISM work authorization and

  15. The role of organizational structure in readiness for change: A conceptual integration.

    Science.gov (United States)

    Benzer, Justin K; Charns, Martin P; Hamdan, Sami; Afable, Melissa

    2017-02-01

    The purpose of this review is to extend extant conceptualizations of readiness for change as an individual-level phenomenon. This review-of-reviews focuses on existing conceptual frameworks from the dissemination, implementation, quality improvement, and organizational transformation literatures in order to integrate theoretical rationales for how organization structure, a key dimension of the organizational context, may impact readiness for change. We propose that the organization structure dimensions of differentiation and integration impact readiness for change at the individual level of analysis by influencing four key concepts of relevance, legitimacy, perceived need for change, and resource allocation. We identify future research directions that focus on these four key concepts.

  16. Factors related to self-directed learning readiness of students in health professional programs: A scoping review.

    Science.gov (United States)

    Slater, Craig E; Cusick, Anne

    2017-05-01

    Academic and professional drivers have stimulated interest in self-directed learning of students in pre-certification health professional programs. Particular attention has focussed on factors which may influence a students' readiness for self-directed learning. A five stage structured scoping review of published literature was conducted to identify measures of self-directed learning readiness used with students in pre-certification health professional programs and those factors that have been investigated as potential determinants. Relevant articles were identified in six databases using key search terms and a search strategy. Two independent reviewers used criteria to cull irrelevant sources. Articles which met eligibility criteria were charted. The final analysis included 49 articles conducted in nursing, medicine, physiotherapy, pharmacy, occupational therapy and dentistry cohorts. Twenty-one potential determinants had been investigated with gender, year level, age program delivery and previous education level the most common. Self-directed learning readiness has been of interest globally, mostly in medicine and nursing, and studies have nearly exclusively used one of two instruments. There is nascent evidence that age, year level and previous education level may have positive influence. These factors have in common the passing of time and may in fact be proxy for more encompassing developmental or social constructs. Further research is needed particularly in the allied health professions where there is limited research in very few disciplines. Studies in interprofessional contexts may be an efficient approach to increasing the knowledge base. Further work is also warranted to determine appropriate use of the two instruments across the range of health disciplines. Copyright © 2017 Elsevier Ltd. All rights reserved.

  17. A survey on the measure of combat readiness

    Science.gov (United States)

    Wen, Kwong Fook; Nor, Norazman Mohamad; Soon, Lee Lai

    2014-09-01

    Measuring the combat readiness in military forces involves the measures of tangible and intangible elements of combat power. Though these measures are applicable, the mathematical models and formulae used focus mainly on either the tangible or the intangible elements. In this paper, a review is done to highlight the research gap in the formulation of a mathematical model that incorporates tangible elements with intangible elements to measure the combat readiness of a military force. It highlights the missing link between the tangible and intangible elements of combat power. To bridge the gap and missing link, a mathematical model could be formulated that measures both the tangible and intangible aspects of combat readiness by establishing the relationship between the causal (tangible and intangible) elements and its effects on the measure of combat readiness. The model uses multiple regression analysis as well as mathematical modeling and simulation which digest the capability component reflecting its assets and resources, the morale component reflecting human needs, and the quality of life component reflecting soldiers' state of satisfaction in life. The results of the review provide a mean to bridge the research gap through the formulation of a mathematical model that shows the total measure of a military force's combat readiness. The results also significantly identify parameters for each of the variables and factors in the model.

  18. Some Thoughts on Systematic Reading Readiness Instruction.

    Science.gov (United States)

    Palardy, J. Michael

    1984-01-01

    Examines four specific areas of reading readiness--visual discrimination, visual memory, auditory discrimination, and auditory comprehension--and reviews teaching strategies in each of the four areas. (FL)

  19. Implementation plan for the Waste Experimental Reduction Facility Restart Operational Readiness Review

    International Nuclear Information System (INIS)

    1993-03-01

    The primary technical objective for the WERF Restart Project is to assess, upgrade where necessary, and implement management, documentation, safety, and operation control systems that enable the resumption and continued operation of waste treatment and storage operations in a manner that is compliant with all environment, safety, and quality requirements of the US Department of Energy and Federal and State regulatory agencies. Specific processes that will be resumed at WERF include compaction of low-level compatible waste; size reduction of LLW, metallic and wood waste; incineration of combustible LLW and MLLW; and solidification of low-level and mixed low-level incinerator bottom ash, baghouse fly ash, and compatible sludges and debris. WERF will also provide for the operation of the WWSB which includes storage of MLLW in accordance with Resource Conservation and Recovery Act requirements

  20. Making Technology Ready: Integrated Systems Health Management

    Science.gov (United States)

    Malin, Jane T.; Oliver, Patrick J.

    2007-01-01

    This paper identifies work needed by developers to make integrated system health management (ISHM) technology ready and by programs to make mission infrastructure ready for this technology. This paper examines perceptions of ISHM technologies and experience in legacy programs. Study methods included literature review and interviews with representatives of stakeholder groups. Recommendations address 1) development of ISHM technology, 2) development of ISHM engineering processes and methods, and 3) program organization and infrastructure for ISHM technology evolution, infusion and migration.

  1. Analyzing International Readiness of Small and Medium-Sized Enterprises

    Directory of Open Access Journals (Sweden)

    Mohammad Reza Hamidizadeh

    2015-01-01

    Full Text Available Internationalization has different connotations for different social sciences and its social, economic and cultural impacts have been examined by a number of studies. While firms’ internationalization processes have been understood as being dynamic, the concept of international readiness has rarely been the main focus of research efforts, which until a decade ago, focused principally on explaining sequences of entry modes and choices of markets. The emergence of the study of international entrepreneurship has enhanced the role of readiness. This study reviews the concept of international readiness by experimental and theoretical studies. Axioms in this research are based on content analysis. The framework incorporates measures to evaluate SMEs’ international readiness. The paper concludes with a research agenda as a guide for future work on considering the readiness as a critical phase before the internationalization process.

  2. Managing Military Readiness

    Science.gov (United States)

    2017-02-01

    These metrics contain critical information and have their place in readiness management. However, they have never been sufficient to fully...demand signals along with simultaneity assumptions form the es- sence of the operational requirements in national strategy. This section briefly... places demands on the capability and capacity of the Air Force that consume its resources in today’s fight and exceed our capacity to address

  3. Electricity market readiness plan : Ontario Energy Board

    International Nuclear Information System (INIS)

    2001-03-01

    This document informs electric power market participants of the Ontario Energy Board's newly developed market readiness plan and target timelines that local distribution companies (LDCs) must meet for retail marketing. The Ontario Energy Board's plan incorporates relevant independent market operator (IMO)-administered market milestones with retail market readiness targeted for September 2001. The market readiness framework involves a self-certification process for LDCs by August 10, 2001, through which the Board will be able to monitor progress and assess the feasibility of meeting the target timelines. For retail market readiness, all LDCs will have to calculate settlement costs, produce unbundled bills, provide standard supply service, change suppliers and accommodate retail transactions. LDCs must be either authorized participants in the IMO-administered market or become retail customers of their host LDC. Unbundled bills will include itemized charges for energy price, transmission, distribution and debt retirement charge. 1 tab., 1 fig

  4. The Psychological Adaptation of CF Augmentees: Effects of Personality, Situational Appraisals, Social Support, and Prior Stressors on Operational Readiness

    Science.gov (United States)

    2004-08-01

    operational readiness Megan M. Thompson DRDC Toronto Monique A. M. Gignac Division of Population Health, University of Toronto Donald R. McCreary DRDC...support are related to increased mortality rates in population health studies (Berkman & Syme, 1994; House, Landis , & Umberson, 2003). Interestingly...of Personality and Social Psychology, 4, 1146-1163. 55. House, J. S., Landis , K. R., & Umberson, D. (2003). Social relationships and health. In P

  5. Measuring readiness for entrepreneurship: An information tool proposal

    OpenAIRE

    Alicia Coduras; José Manuel Saiz-Alvarez; Jesús Ruiz

    2016-01-01

    A profound review of the literature on entrepreneurship reveals that it does not exist a specific information tool to measure the individuals’ readiness for entrepreneurship. The purpose of this research has been building such kind of instrument to estimate the individuals’ readiness for entrepreneurship. Its design takes in consideration the inclusion of the main variables identified by the literature as those most associated with entrepreneurial profiles. These variables have been grouped i...

  6. NGNP Infrastructure Readiness Assessment: Consolidation Report

    International Nuclear Information System (INIS)

    Castle, Brian K.

    2011-01-01

    The Next Generation Nuclear Plant (NGNP) project supports the development, demonstration, and deployment of high temperature gas-cooled reactors (HTGRs). The NGNP project is being reviewed by the Nuclear Energy Advisory Council (NEAC) to provide input to the DOE, who will make a recommendation to the Secretary of Energy, whether or not to continue with Phase 2 of the NGNP project. The NEAC review will be based on, in part, the infrastructure readiness assessment, which is an assessment of industry's current ability to provide specified components for the FOAK NGNP, meet quality assurance requirements, transport components, have the necessary workforce in place, and have the necessary construction capabilities. AREVA and Westinghouse were contracted to perform independent assessments of industry's capabilities because of their experience with nuclear supply chains, which is a result of their experiences with the EPR and AP-1000 reactors. Both vendors produced infrastructure readiness assessment reports that identified key components and categorized these components into three groups based on their ability to be deployed in the FOAK plant. The NGNP project has several programs that are developing key components and capabilities. For these components, the NGNP project have provided input to properly assess the infrastructure readiness for these components.

  7. NGNP Infrastructure Readiness Assessment: Consolidation Report

    Energy Technology Data Exchange (ETDEWEB)

    Brian K Castle

    2011-02-01

    The Next Generation Nuclear Plant (NGNP) project supports the development, demonstration, and deployment of high temperature gas-cooled reactors (HTGRs). The NGNP project is being reviewed by the Nuclear Energy Advisory Council (NEAC) to provide input to the DOE, who will make a recommendation to the Secretary of Energy, whether or not to continue with Phase 2 of the NGNP project. The NEAC review will be based on, in part, the infrastructure readiness assessment, which is an assessment of industry's current ability to provide specified components for the FOAK NGNP, meet quality assurance requirements, transport components, have the necessary workforce in place, and have the necessary construction capabilities. AREVA and Westinghouse were contracted to perform independent assessments of industry's capabilities because of their experience with nuclear supply chains, which is a result of their experiences with the EPR and AP-1000 reactors. Both vendors produced infrastructure readiness assessment reports that identified key components and categorized these components into three groups based on their ability to be deployed in the FOAK plant. The NGNP project has several programs that are developing key components and capabilities. For these components, the NGNP project have provided input to properly assess the infrastructure readiness for these components.

  8. Cost and Information Effectiveness Analysis (CIEA): A Methodology for Evaluating a Training Device Operational Readiness Assessment Capability (DORAC).

    Science.gov (United States)

    1981-02-01

    Report 528 COST AIND I*FO•?JidTH ?i EFFECT•• ES1BS ANALYSIS (CDEA): A METiBLOBU Y FOR EVALUATIN1G A TRAINING DEMCE OPERATMDN1AL MAEA3 ],SE 3SSESS$ iElT ...8217, N. Within a military setting, the uses of training devices in performance evaluation have generally mirrored civilian uses and primarily...Technical Report 528 COST AND INFORMATION EFFECTIVENESS ANALYSIS (CIEA): A METHODOLOGY FOR EVALUATING A TRAINING DEVICE OPERATIONAL READINESS

  9. Operational readiness decisions at nuclear power plants. Which factors influence the decisions?; Driftklarhetsbeslut i kaernkraftanlaeggningar. Vilka faktorer paaverkar beslutsfattandet?

    Energy Technology Data Exchange (ETDEWEB)

    Kecklund, Lena; Petterson, Sara (MTO Psykologi, Stockholm (SE))

    2007-11-15

    The purpose of this project has been to propose a model for how operational readiness decisions are made and to identify important factors influencing these decisions. The project has also studied the support from the management system for decision making, and made a comparison to how decisions are made in practice. This is mainly an explorative study, but it also deals with relevant research and theories about decision making. The project consists of several parts. The first part is composed of descriptions of important notations and terms, and a summary of relevant research about decision making and its relation to the management system. The project proposes a model for the decision making process. The second part consists of analyses of reports from SKI about operational readiness decisions. The last part is a case study at a nuclear power plant. The case study describes the support from work method theories at the nuclear power plant to the decision maker. Decision makers with different roles in the safety management system were interviewed to give a description of the decision making process and of factors influencing the decisions made in practice. The case study also consists of an analysis of decisions in some real events at the nuclear power plant, as well as of making interviews in connection with these. To sum up, this report presents a model for the decision process and describes the work method theories that support the different parts in the process, how the different parts are applied in practice and circumstances that influence the decision process. The results of the project give an understanding for decision making in operational readiness decisions and the factors that influence the decision. The results are meant to be used as a basis for further studies in other nuclear power plants. The results indicate that the decision process is facilitated if there are clear criteria and work methods, if the work methods are well established and if the

  10. Y2K compliance readiness and contingency planning.

    Science.gov (United States)

    Stahl, S; Cohan, D

    1999-09-01

    As the millennium approaches, discussion of "Y2K compliance" will shift to discussion of "Y2K readiness." While "compliance" focuses on the technological functioning of one's own computers, "readiness" focuses on the operational planning required in a world of interdependence, in which the functionality of one's own computers is only part of the story. "Readiness" includes the ability to cope with potential Y2K failures of vendors, suppliers, staff, banks, utility companies, and others. Administrators must apply their traditional skills of analysis, inquiry and diligence to the manifold imaginable challenges which Y2K will thrust upon their facilities. The SPICE template can be used as a systematic tool to guide planning for this historic event.

  11. OPG's long term management proposal for low and intermediate level radioactive waste: project description, operations

    International Nuclear Information System (INIS)

    Witzke, P.

    2011-01-01

    Although the Deep Geologic Repository (DGR) is approximately 8 years away from being placed into service, it is time to start planning for operations. Ontario Power Generation's (OPG) Nuclear Waste Management Division (NWMD) has a systematic approach to preparing for operation of any new facility that is readily applicable to the DGR. The DGR Operational Readiness Plan has been benchmarked at similar facilities in North America and Europe. The operating vision is a living model, and is constantly being reviewed and refined to align with the detailed design of the DGR as it proceeds through its phases of development. Combined with 40 years of operating surface storage facilities for the storage of Low and Intermediate Level Waste (LILW), the DGR operating vision will enable NWMD to provide meaningful input during COMS (Constructability, Operability, Maintainability, and Safety) review in the DGR project detailed-design phase in 2011/2012. A Work Breakdown Structure has been used to communicate the detail of the operating vision, and also to estimate the costs of Operational Readiness and Operations during the lifetime of the facility. (author)

  12. Human Resources Readiness as TSO for Deterministic Safety Analysis on the First NPP in Indonesia

    International Nuclear Information System (INIS)

    Sony Tjahyani, D. T.

    2010-01-01

    In government regulation no. 43 year 2006 it is mentioned that preliminary safety analysis report and final safety analysis report are one of requirements which should be applied in construction and operation licensing for commercial power reactor (NPPs). The purpose of safety analysis report is to confirm the adequacy and efficiency of provisions within the defence in depth of nuclear reactor. Deterministic analysis is used on the safety analysis report. One of the TSO task is to evaluate this report based on request of operator or regulatory body. This paper discusses about human resources readiness as TSO for deterministic safety analysis on the first NPP in Indonesia. The assessment is done by comparing the analysis step on SS-23 and SS-30 with human resources status of BATAN currently. The assessment results showed that human resources for deterministic safety analysis are ready as TSO especially to review preliminary safety analysis report and to revise final safety analysis report in licensing on the first NPP in Indonesia. Otherwise, to prepare the safety analysis report is still needed many competency human resources. (author)

  13. Pipeline system operability review

    Energy Technology Data Exchange (ETDEWEB)

    Eriksson, Kjell [Det Norske Veritas (Norway); Davies, Ray [CC Technologies, Dublin, OH (United States)

    2005-07-01

    Pipeline operators are continuously working to improve the safety of their systems and operations. In the US both liquid and gas pipeline operators have worked with the regulators over many years to develop more systematic approaches to pipeline integrity management. To successfully manage pipeline integrity, vast amounts of data from different sources needs to be collected, overlaid and analyzed in order to assess the current condition and predict future degradation. The efforts undertaken by the operators has had a significant impact on pipeline safety, nevertheless, during recent years we have seen a number of major high profile accidents. One can therefore ask how effective the pipeline integrity management systems and processes are. This paper will present one methodology 'The Pipeline System Operability Review' that can evaluate and rate the effectiveness of both the management systems and procedures, as well as the technical condition of the hardware. The result from the review can be used to compare the performance of different pipelines within one operating company, as well as benchmark with international best practices. (author)

  14. Pipeline system operability review

    Energy Technology Data Exchange (ETDEWEB)

    Eriksson, Kjell [Det Norske Veritas (Norway); Davies, Ray [CC Technologies, Dublin, OH (United States)

    2005-07-01

    Pipeline operators are continuously working to improve the safety of their systems and operations. In the US both liquid and gas pipeline operators have worked with the regulators over many years to develop more systematic approaches to pipeline integrity management. To successfully manage pipeline integrity, vast amounts of data from different sources needs to be collected, overlaid and analyzed in order to assess the current condition and predict future degradation. The efforts undertaken by the operators has had a significant impact on pipeline safety, nevertheless, during recent years we have seen a number of major high profile accidents. One can therefore ask how effective the pipeline integrity management systems and processes are. This paper will present one methodology 'The Pipeline System Operability Review' that can evaluate and rate the effectiveness of both the management systems and procedures, as well as the technical condition of the hardware. The result from the review can be used to compare the performance of different pipelines within one operating company, as well as benchmark with international best practices. (author)

  15. Managed Readiness Simulator (MARS) V2: Implementation of the Managed Readiness Model

    Science.gov (United States)

    2010-12-01

    The SRDB architecture is described in detail in [6]. Database VBA VBA Runtime Data Sub run() SQL (“UPDATE Table SET Rank = 5”) Run_query_obj...FilterResources”) Algorithms ( VBA & SQL ) End Sub Arena Process Logic Figure 5: MARS V2 simulation architecture. The MARS managed readiness...database layer below it. Using VBA blocks, the algorithm layer can execute complex data operations on the database layer using SQL and can return

  16. Defensive Operations in a Decisive Action Training Environment

    Science.gov (United States)

    2017-07-01

    Operations in a Decisive Action Training Environment Christopher L. Vowels W. Anthony Scroggins U.S. Army Research Institute Captain Kyle T...Daniels Master Sergeant Paul M. Volino Joint Readiness Training Center July 2017 Approved for public release; distribution is unlimited...for distribution: MICHELLE SAMS Director Technical review by Dr. William R. Bickley, U.S. Army Research

  17. Safe, Healthy and Ready to Succeed: Arizona School Readiness Key Performance Indicators

    Science.gov (United States)

    Migliore, Donna E.

    2006-01-01

    "Safe, Healthy and Ready to Succeed: Arizona School Readiness Key Performance Indicators" presents a set of baseline measurements that gauge how well a statewide system of school readiness supports is addressing issues that affect Arizona children's readiness for school. The Key Performance Indicators (KPIs) measure the system, rather…

  18. Technology Readiness for the Smart Grid

    Energy Technology Data Exchange (ETDEWEB)

    Kirkham, Harold; Marinovici, Maria C.; Fitzpatrick, G.; Lindsey, K.; McBride, James; Clark, G. L.

    2013-06-30

    Reluctance to adopt new technology into a utility application is understandable, given the critical nature of the infrastructure and the less-than-ideal experiences of some power companies. The authors of this paper have considered adapting the NASA approach of classifying technology readiness, but find it not quite appropriate because NASA was both the developer and the eventual user of the new technology it was evaluating, whereas a utility is ordinarily in the mode of a customer, acquiring a new product from a manufacturer. Instead of a generic scale of technology readiness, a scale of readiness is proposed specifically for the smart grid, based on the many standards that exist for the relevant technologies. In this paper we present an overall structure for organization those standards. The acceptance of new technology is organized into five SGL (Smart Grid Level) steps, numbered five through 9 to correspond approximately to the last five numbers of the NASA TRL scale. SGL 5 is a certification that the hardware and software of the technology is safe for the system into which is intended to be placed. SGL 6 is documentation that the system is safe for itself, and will have adequate reliability. It is thus clear that the steps differ from NASA’s TRL in that technology development is not required, the transition is more one of documenting already existing system readiness. Since SGL 6 describes a system that is safe for the power system and for itself, it should not be restricted from being in a pilot-scale study, and achieving SGL 7. A larger-scale demonstration in a realistic environment will demonstrate interoperability and achieve SGL 8. Only when systems are installed and operating, and when disposal plans are in place will the designation of fully operable at SGL 9 be granted.

  19. StormReady in a Box: Enhancing NOAA's Presence in Schools

    Science.gov (United States)

    Grondin, N. S.; Franks, C.

    2015-12-01

    The National Weather Service StormReady Supporter program exists to give schools, companies, TV stations, and other facilities the opportunity to earn recognition for their weather preparedness and awareness. Requirements to earn StormReady Supporter status include having a facility warning point, use of NOAA Weather Radios, and weather hazard Emergency Operation Plans. Despite the increasing importance of weather preparedness in schools, only 1.2% of Minnesota schools are deemed StormReady by the National Weather Service. It was determined that the major impedance for schools becoming StormReady Supporters is the lack of time for administrators to engage in anything "extra" beyond their listed duties. As part of a 2015 Hollings Scholar project, the StormReady in a Box concept was developed to remedy this, by empowering teachers and students to take charge and complete the StormReady Supporter application for their school. StormReady in a Box is a project developed for Junior High School students to learn about weather preparedness and to help their school acquire StormReady status. The project was designed to be relevant to the Minnesota State Education Standards in Science, be simple for teachers to do with their students, and most importantly, to be enjoyable for Junior High School age students to do. The project was also designed to enhance critical thinking skills and logical reasoning abilities, as they relate to the StormReady Supporter application. This presentation will present the overall rationale for the undertaking of this project, the creation of, and the logical next steps for the StormReady in a Box project.

  20. How Satellites Have Contributed to Building a Weather Ready Nation

    Science.gov (United States)

    Lapenta, W.

    2017-12-01

    NOAA's primary mission since its inception has been to reduce the loss of life and property, as well as disruptions from, high impact weather and water-related events. In recent years, significant societal losses resulting even from well forecast extreme events have shifted attention from the forecast alone toward ensuring societal response is equal to the risks that exist for communities, businesses and the public. The responses relate to decisions ranging from coastal communities planning years in advance to mitigate impacts from rising sea level, to immediate lifesaving decisions such as a family seeking adequate shelter during a tornado warning. NOAA is committed to building a "Weather-Ready Nation" where communities are prepared for and respond appropriately to these events. The Weather-Ready Nation (WRN) strategic priority is building community resilience in the face of increasing vulnerability to extreme weather, water, climate and environmental threats. To build a Weather-Ready Nation, NOAA is enhancing Impact-Based Decision Support Services (IDSS), transitioning science and technology advances into forecast operations, applying social science research to improve the communication and usefulness of information, and expanding its dissemination efforts to achieve far-reaching readiness, responsiveness and resilience. These four components of Weather-Ready Nation are helping ensure NOAA data, products and services are fully utilized to minimize societal impacts from extreme events. Satellite data and satellite products have been important elements of the national Weather Service (NWS) operations for more than 40 years. When one examines the uses of satellite data specific to the internal forecast and warning operations of NWS, two main applications are evident. The first is the use of satellite data in numerical weather prediction models; the second is the use of satellite imagery and derived products for mesoscale and short-range weather warning and

  1. A systematic review of instruments to assess organizational readiness for knowledge translation in health care.

    Directory of Open Access Journals (Sweden)

    Marie-Pierre Gagnon

    Full Text Available The translation of research into practices has been incomplete. Organizational readiness for change (ORC is a potential facilitator of effective knowledge translation (KT. However we know little about the best way to assess ORC. Therefore, we sought to systematically review ORC measurement instruments.We searched for published studies in bibliographic databases (Pubmed, Embase, CINAHL, PsychINFO, Web of Science, etc. up to November 1st, 2012. We included publications that developed ORC measures and/or empirically assessed ORC using an instrument at the organizational level in the health care context. We excluded articles if they did not refer specifically to ORC, did not concern the health care domain or were limited to individual-level change readiness. We focused on identifying the psychometric properties of instruments that were developed to assess readiness in an organization prior to implementing KT interventions in health care. We used the Standards for Educational and Psychological Testing to assess the psychometric properties of identified ORC measurement instruments.We found 26 eligible instruments described in 39 publications. According to the Standards for Educational and Psychological Testing, 18 (69% of a total of 26 measurement instruments presented both validity and reliability criteria. The Texas Christian University -ORC (TCU-ORC scale reported the highest instrument validity with a score of 4 out of 4. Only one instrument, namely the Modified Texas Christian University - Director version (TCU-ORC-D, reported a reliability score of 2 out of 3. No information was provided regarding the reliability and validity of five (19% instruments.Our findings indicate that there are few valid and reliable ORC measurement instruments that could be applied to KT in the health care sector. The TCU-ORC instrument presents the best evidence in terms of validity testing. Future studies using this instrument could provide more knowledge on its

  2. Measuring readiness for entrepreneurship: An information tool proposal

    Directory of Open Access Journals (Sweden)

    Alicia Coduras

    2016-05-01

    Full Text Available A profound review of the literature on entrepreneurship reveals that it does not exist a specific information tool to measure the individuals’ readiness for entrepreneurship. The purpose of this research has been building such kind of instrument to estimate the individuals’ readiness for entrepreneurship. Its design takes in consideration the inclusion of the main variables identified by the literature as those most associated with entrepreneurial profiles. These variables have been grouped into three categories: sociological, psychological and managerial-entrepreneurial. Each group provides batteries of items which are evaluated thanks to a specific scoring system. The final objective is to provide a system to calculate individual scores of readiness for entrepreneurship and, at the same time, partial scores on concrete aspects of it. The information tool is presented at this paper and will be tested and refined in the near future.

  3. Criteria for operator review of workplace changes

    International Nuclear Information System (INIS)

    Davey, E.

    2000-01-01

    A set of criteria for reviewing workplace changes has been developed for use by plant Operations staff. The criteria were developed to provide Operations staff with a practical framework for structuring assessments and subsequent review comments with regard to control room modifications and innovations that impact their work environment. The criteria were assembled from design, operations and human factors engineering principles, and system review experiences with plant Operations staff over the past ten years. Operations staff at several CANDU stations helped shape the emphasis for initial criteria definition and have assisted with criteria refinement through trial applications. Use of the criteria is expected to lead to more effective and task relevant equipment evaluations by Operations staff, and ultimately lead to system modifications and innovations that better serve plant operation needs. The paper begins with a discussion of the rationale for criteria development and the attributes of 'good' design. The balance of the paper outlines the project objectives, describes the approach applied in assembling, structuring, and refining the review criteria, and illustrates the application of the criteria in the review of a proposed control room innovation. (author)

  4. Leveraging Advanced Technology in Army and Air Force Readiness and Sustainment Training

    National Research Council Canada - National Science Library

    Lindsey, Kathy

    2003-01-01

    Operational readiness and sustainment training allow military forces to be prepared for various types of contingency operations and provide for the primary means of protection and defense of United...

  5. Ready or Not...? Teen Sexuality and the Troubling Discourse of Readiness

    Science.gov (United States)

    Ashcraft, Catherine

    2006-01-01

    In this article, I explore how talk about being "ready" or "not ready" for sex shapes teen and adult understandings of sexuality. I argue that this "discourse of readiness" poses serious threats to teens' identity development, sexual decision making, and educators efforts to help them through these processes. To illustrate, I draw from my…

  6. Remedial action and waste disposal project -- 300-FF-1 remedial action readiness assessment plan

    International Nuclear Information System (INIS)

    April, J.G.; Carlson, R.A.; Greif, A.A.; Johnson, C.R.; Orewiler, R.I.; Perry, D.M.; Plastino, J.C.; Roeck, F.V.; Tuttle, B.G.

    1997-04-01

    This Readiness Assessment Plan presents the methodology used to assess the readiness of the 300-FF-1 Remedial Action Project. Remediation involves the excavation, treatment if applicable, and final disposal of contaminated soil and debris associated with the waste sites in the 300-FF-1 Operable Unit. The scope of the 300-FF-1 remediation is to excavate, transport, and dispose of contaminated solid from sites identified in the 300-FF-1 Operable Unit

  7. IMO administered markets readiness report : public report issue 1.4

    International Nuclear Information System (INIS)

    2001-01-01

    This report presents an assessment of the date by which the Independent Electricity Market Operator (IMO) will be in a position to open the Ontario electricity market. The report is based on objective results derived from the IMO's own testing and the testing that participants in the electric power market have performed with the IMO. The testing was designed to provide appropriate assurance that the electric power systems and processes would operate according to requirements. The report describes market opening timelines constraints and assumptions. A thorough description of seven conditions that were used to make the readiness assessment for market opening conditions was also included in this report. The conditions included IMO readiness, participant readiness, contingency arrangements, reliable operations, market design, legal framework, and system adequacy. Based on this assessment, the IMO is confident that its systems and capabilities can support a market opening as of March 1, 2002. However, it was noted that market participants would benefit from access to a full production data set to fully complete their testing in mid January 2002. This additional testing would also add confidence in the market. The IMO's advice is that April 1, 2002 would be an appropriate data for market opening. tabs

  8. Final Report for the Restart of the Waste Characterization, Reduction and Repackaging Facility (WCRRF) Contractor Readiness Assessment (CRA)

    Energy Technology Data Exchange (ETDEWEB)

    Stephens, Gregory Mark [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-02-22

    The Los Alamos National Laboratory (LANL or Laboratory) Contractor Readiness Assessment (CRA) required for restart of the Technical Area (TA) 50 Waste Characterization, Reduction, and Repackaging Facility (WCRRF) for remediated nitrate salt (RNS) waste operations was performed in compliance with the requirements of Department of Energy (DOE) Order (O) 425.1D, Verification of Readiness to Start Up or Restart Nuclear Facilities, and LANL procedure FSD-115-001, Verification of Readiness to Start Up or Restart LANL Nuclear Facilities, Activities, and Operations.

  9. System analysis for technology transfer readiness assessment of horticultural postharvest

    Science.gov (United States)

    Hayuningtyas, M.; Djatna, T.

    2018-04-01

    Availability of postharvest technology is becoming abundant, but only a few technologies are applicable and useful to a wider community purposes. Based on this problem it requires a significant readiness level of transfer technology approach. This system is reliable to access readiness a technology with level, from 1-9 and to minimize time of transfer technology in every level, time required technology from the selection process can be minimum. Problem was solved by using Relief method to determine ranking by weighting feasible criteria on postharvest technology in each level and PERT (Program Evaluation Review Technique) to schedule. The results from ranking process of post-harvest technology in the field of horticulture is able to pass level 7. That, technology can be developed to increase into pilot scale and minimize time required for technological readiness on PERT with optimistic time of 7,9 years. Readiness level 9 shows that technology has been tested on the actual conditions also tied with estimated production price compared to competitors. This system can be used to determine readiness of technology innovation that is derived from agricultural raw materials and passes certain stages.

  10. Nuclear explosives testing readiness evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Valk, T.C.

    1993-09-01

    This readiness evaluation considers hole selection and characterization, verification, containment issues, nuclear explosive safety studies, test authorities, event operations planning, canister-rack preparation, site preparation, diagnostic equipment setup, device assembly facilities and processes, device delivery and insertion, emplacement, stemming, control room activities, readiness briefing, arming and firing, test execution, emergency response and reentry, and post event analysis to include device diagnostics, nuclear chemistry, and containment. This survey concludes that the LLNL program and its supporting contractors could execute an event within six months of notification, and a second event within the following six months, given the NET group`s evaluation and the following three restraints: (1) FY94 (and subsequent year) funding is essentially constant with FY93, (2) Preliminary work for the initial event is completed to the historical sic months status, (3) Critical personnel, currently working in dual use technologies, would be recallable as needed.

  11. Readiness to proceed: Characterization planning basis

    International Nuclear Information System (INIS)

    Adams, M.R.

    1998-01-01

    This report summarizes characterization requirements, data availability, and data acquisition plans in support of the Phase 1 Waste Feed Readiness to Proceed Mid-Level Logic. It summarizes characterization requirements for the following program planning documents: Waste Feed Readiness Mid-Level Logic and Decomposition (in development); Master blue print (not available); Tank Waste Remediation System (TWRS) Operations and Utilization Plan and Privatization Contract; Enabling assumptions (not available); Privatization low-activity waste (LAW) Data Quality Objective (DQO); Privatization high-level waste (HLW) DQO (draft); Problem-specific DQOs (in development); Interface control documents (draft). Section 2.0 defines the primary objectives for this report, Section 3.0 discusses the scope and assumptions, and Section 4.0 identifies general characterization needs and analyte-specific characterization needs or potential needs included in program documents and charts. Section 4.0 also shows the analyses that have been conducted, and the archive samples that are available for additional analyses. Section 5.0 discusses current plans for obtaining additional samples and analyses to meet readiness-to-proceed requirements. Section 6.0 summarizes sampling needs based on preliminary requirements and discusses other potential characterization needs. Many requirements documents are preliminary. In many cases, problem-specific DQOs have not been drafted, and only general assumptions about the document contents could be obtained from the authors. As a result, the readiness-to-proceed characterization requirements provided in this document are evolving and may change

  12. UNIVERSITY TEACHERS’ READINESS TO APPLY THE MODERN EDUCATIONAL TECHNOLOGIES

    Directory of Open Access Journals (Sweden)

    Irina O. Kotlyarova

    2015-01-01

    Full Text Available The aim of the research is to investigate the readiness of the university teachers to apply the modern educational technologies. Methods. The methods include theoretical: analysis of existing modern educational technologies, the concept «readiness» and its components, abstraction of signs and kinds of modern educational technologies based on the scientific literature and in the Federal State Educational Standards (FSES; empirical: questionnaires and testing methods for detecting levels of university teachers’ skills and readiness to use modern educational technology. Results. The main features of modern educational technologies are identified and justified that are to comply with modern methodology of the theory and practice of education study and the latest FSES requirements; the level of science, manufacturing, and modern rules of human relations. The components of readiness of university teachers to use modern educational technology are structured. The linguistic component is included along with the cognitive, psychological, operational, connotative components; its necessity is proved. The average level of readiness for the use of modern educational technology by university teachers is identified. Scientific novelty. The author specifies the features of the modern educational technology. The most significant components of higher-education teaching personnel readiness to use technological innovations are identified. As a whole, these results form the indicative framework for the development and measurement of readiness of the university teachers to use the modern educational technology. The development of the readiness of the university teachers to apply the modern educational technologies is proved to be an issue of current interest. Practical significance. The research findings can be used as the basis of techniques and methods designing for its further development and measurement of the training, retraining and advanced training of

  13. Systems security and functional readiness

    International Nuclear Information System (INIS)

    Bruckner, D.G.

    1988-01-01

    In Protective Programming Planning, it is important that every facility or installation be configured to support the basic functions and mission of the using organization. This paper addresses the process of identifying the key functional operations of our facilities in Europe and providing the security necessary to keep them operating in natural and man-made threat environments. Functional Readiness is important since many of our existing facilities in Europe were not constructed to meet the demands of today's requirements. There are increased requirements for real-time systems with classified terminals and stringent access control, tempest and other electronic protection devices. One must prioritize the operations of these systems so that essential functions are provided even when the facilities are affected by overt or covert hostile activities

  14. A Systematic Review of Instruments to Assess Organizational Readiness for Knowledge Translation in Health Care

    Science.gov (United States)

    Gagnon, Marie-Pierre; Attieh, Randa; Ghandour, El Kebir; Légaré, France; Ouimet, Mathieu; Estabrooks, Carole A.; Grimshaw, Jeremy

    2014-01-01

    Background The translation of research into practices has been incomplete. Organizational readiness for change (ORC) is a potential facilitator of effective knowledge translation (KT). However we know little about the best way to assess ORC. Therefore, we sought to systematically review ORC measurement instruments. Methods We searched for published studies in bibliographic databases (Pubmed, Embase, CINAHL, PsychINFO, Web of Science, etc.) up to November 1st, 2012. We included publications that developed ORC measures and/or empirically assessed ORC using an instrument at the organizational level in the health care context. We excluded articles if they did not refer specifically to ORC, did not concern the health care domain or were limited to individual-level change readiness. We focused on identifying the psychometric properties of instruments that were developed to assess readiness in an organization prior to implementing KT interventions in health care. We used the Standards for Educational and Psychological Testing to assess the psychometric properties of identified ORC measurement instruments. Findings We found 26 eligible instruments described in 39 publications. According to the Standards for Educational and Psychological Testing, 18 (69%) of a total of 26 measurement instruments presented both validity and reliability criteria. The Texas Christian University –ORC (TCU-ORC) scale reported the highest instrument validity with a score of 4 out of 4. Only one instrument, namely the Modified Texas Christian University – Director version (TCU-ORC-D), reported a reliability score of 2 out of 3. No information was provided regarding the reliability and validity of five (19%) instruments. Conclusion Our findings indicate that there are few valid and reliable ORC measurement instruments that could be applied to KT in the health care sector. The TCU-ORC instrument presents the best evidence in terms of validity testing. Future studies using this instrument could

  15. An Exploratory Analysis of Readiness for Environmental Education.

    Science.gov (United States)

    Harmon, N. Paul; And Others

    Contained in this monograph is a review and synthesis of developmental psychology and learning theory, with major emphasis upon applications of the developmental perspective to environmental education curriculum and instruction. Based upon a summary of the work of Piaget and his followers, a learning readiness axis is proposed. Also examined are…

  16. Final Report: Contractor Readiness Assessment (CRA) for TREAT Fuel Movement and Control Rod Drives Isolation

    Energy Technology Data Exchange (ETDEWEB)

    Rowsell, David Leon [Idaho National Laboratory (INL), Idaho Falls, ID (United States)

    2015-06-01

    This report documents the Contractor Readiness Assessment (CRA) for TREAT Fuel Movement and Control Rod Drives Isolation. The review followed the approved Plan of Action (POA) and Implementation Plan (IP) using the identified core requirements. The activity was limited scope focusing on the control rod drives functional isolation and fuel element movement. The purpose of this review is to ensure the facility's readiness to move fuel elements thus supporting inspection and functionally isolate the control rod drives to maintain the required shutdown margin.

  17. Readiness plan, Hanford 300 Area Treated Effluent Disposal Facility: Revision 1

    International Nuclear Information System (INIS)

    Storm, S.J.

    1994-01-01

    The 300 Area Treated Effluent Disposal Facility (TEDF) is designed for the collection, treatment, and eventual disposal of liquid waste from the 300 Area Process Sewer (PS) system. The PS currently discharges water to the 300 Area Process Trenches. Facilities supported total 54 buildings, including site laboratories, inactive buildings, and support facilities. Effluent discharges to the process sewer from within these facilities include heating, ventilation, and air conditioning systems, heat exchangers, floor drains, sinks, and process equipment. The wastewaters go through treatment processes that include iron coprecipitation, ion exchange and ultraviolet oxidation. The iron coprecipitation process is designed to remove general heavy metals. A series of gravity filters then complete the clarification process by removing suspended solids. Following the iron coprecipitation process is the ion exchange process, where a specific resin is utilized for the removal of mercury. The final main unit operation is the ultraviolet destruction process, which uses high power ultraviolet light and hydrogen peroxide to destroy organic molecules. The objective of this readiness plan is to provide the method by which line management will prepare for a Readiness Assessment (RA) of the TEDF. The self-assessment and RA will assess safety, health, environmental compliance and management readiness of the TEDF. This assessment will provide assurances to both WHC and DOE that the facility is ready to start-up and begin operation

  18. Memo of Readiness to Proceed with Phase 1 Privatization for the Tank Farm Contractor

    International Nuclear Information System (INIS)

    HONEYMAN, J.O.

    2000-01-01

    This Readiness to Proceed Memorandum provides the CH2M HILL Hanford Group, Inc. formal certification of readiness to proceed with provision of the waste feed and infrastructure to handle the products from the privatization contractor's waste processing plant. Summary information is included from the integrated scope-cost-schedule baseline, the analyses of the baseline, management systems, and systems reviews

  19. Control of TFTR during DT operations

    International Nuclear Information System (INIS)

    Pearson, G.G.; Alling, P.D.; Blanchard, W.; Camp, R.A.; Hawryluk, R.J.; Hosea, J.C.; Nagy, A.

    1995-01-01

    Since beginning routine D-T operations in December, 1993, there have been more than 500 DT plasmas and approximately 600,000 Ci of tritium processed through TFTR culminating in greater than 10 MW of fusion power produced in a single discharge in November, 1994. These performance levels were achieved while maintaining the highest levels of personnel and equipment safety. Prior to D-T operations, a Chain of Command structure and a TFTR Shift Supervisor (TFTRSS) position were developed for centralized control of the facility with all subsystems reporting to this position. A comprehensive surveillance system was incorporated such that the TFTR SS could easily review the operational readiness of subsystems for D-T operations. A TFTR SS Station was constructed to facilitate monitoring and control of TFTR. This station includes a camera system, FAX, a networked personal computer, a computerized tritium monitor and control system and a hardware interlock system. In the transition from D-D to D-T operations, TFTR's procedures were reviewed/revised and a number of additional procedures developed for control of activities at the facility. This paper details the equipment, administrative and organizational configurations used for controlling TFTR during D-T operations

  20. A systematic review of peri-operative melatonin

    DEFF Research Database (Denmark)

    Andersen, L P H; Werner, M U; Rosenberg, J

    2014-01-01

    We systematically reviewed randomised controlled trials of peri-operative melatonin. We included 24 studies of 1794 participants that reported eight peri-operative outcomes: anxiety; analgesia; sleep quality; oxidative stress; emergence behaviour; anaesthetic requirements; steal induction......%, respectively. Qualitative reviews suggested the melatonin improved sleep quality and emergence behaviour, and might be capable of reducing oxidative stress and anaesthetic requirements....

  1. Idaho National Laboratory Emergency Readiness Assurance Plan - Fiscal Year 2015

    Energy Technology Data Exchange (ETDEWEB)

    Farmer, Carl J. [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2015-09-01

    Department of Energy Order 151.1C, Comprehensive Emergency Management System requires that each Department of Energy field element documents readiness assurance activities, addressing emergency response planning and preparedness. Battelle Energy Alliance, LLC, as prime contractor at the Idaho National Laboratory (INL), has compiled this Emergency Readiness Assurance Plan to provide this assurance to the Department of Energy Idaho Operations Office. Stated emergency capabilities at the INL are sufficient to implement emergency plans. Summary tables augment descriptive paragraphs to provide easy access to data. Additionally, the plan furnishes budgeting, personnel, and planning forecasts for the next 5 years.

  2. The concept of readiness to change.

    Science.gov (United States)

    Dalton, Cindy C; Gottlieb, Laurie N

    2003-04-01

    Readiness is associated with change, yet there is little understanding of this construct. The purpose of this study was to examine readiness; its referents, associated factors and the resulting consequences. In the course of nursing five clients living with multiple sclerosis over a 7-month period using a Reflective Practice Model, data were systematically gathered using open-ended and then more focused questioning. Data collected during 42 client encounters (28 face-to-face encounters; 14 telephone contacts) were analysed using Chinn and Kramer's concept analysis technique. Findings. The concept of readiness was inductively derived. Readiness is both a state and a process. Before clients can create change they need to become ready to change. A number of factors trigger readiness. These include when: (a) clients perceive that a health concern is not going to resolve, (b) a change in a client's physical condition takes on new significance, (c) clients feel better able to manage their stress, (d) clients have sufficient energy, (e) clients perceive that they have adequate support in undertaking change. When one or more of these factors is present clients become ready to consider change. The process of readiness involves recognizing the need to change, weighing the costs and benefits and, when benefits outweigh costs, planning for change. The desire to change and to take action determines clients' degree of readiness. When they experience a high degree of readiness they report less anger, less depression, and view their condition in a more positive light. In contrast, when they experience a low degree of readiness they report feeling depressed, afraid and vulnerable in the face of change. Nursing has an important role to play in creating conditions to support change. To fulfil this role, nurses need to be able to assess readiness for change and the factors that enable it and then to intervene in ways that facilitate readiness.

  3. Omega-3 polyunsaturated fatty acids to optimize cognitive function for military mission-readiness: a systematic review and recommendations for the field.

    Science.gov (United States)

    Teo, Lynn; Crawford, Cindy; Yehuda, Rachel; Jaghab, Danny; Bingham, John J; Chittum, Holly K; Gallon, Matthew D; O'Connell, Meghan L; Arzola, Sonya M; Berry, Kevin

    2017-06-01

    There has been interest in identifying whether nutrients might help optimize cognitive performance, especially for the military tasked with ensuring mission-readiness. This systematic review assesses the quality of the evidence for n-3 polyunsaturated fatty acids (PUFAs) across various outcomes related to cognitive function in healthy adult populations in order to develop research recommendations concerning n-3 PUFAs for mission-readiness. PubMed, CINAHL, Embase, PsycInfo, and the Cochrane Library were searched. Peer-reviewed randomized controlled trials published in the English language were eligible. Thirteen included trials were assessed for methodological quality, and descriptive data were extracted. Of the acceptable-quality (n = 8) and high-quality (n = 1) studies, 2 produced no statistically significant results, 5 produced mixed results, and 2 did not report between-group results. Results indicate that ingestion of n-3 PUFAs does not significantly alter cognitive performance in cognitively healthy persons. Studies exposing subjects to adverse circumstances that would be most relevant for drawing conclusions specifically for the military population are lacking. Several research recommendations are offered to enhance understanding of the role of fatty acids on cognitive functioning. © The Author(s) 2017. Published by Oxford University Press on behalf of the International Life Sciences Institute. All rights reserved. For Permissions, please e-mail: journals.permissions@oup.com.

  4. Continuous Air Monitor Operating Experience Review

    International Nuclear Information System (INIS)

    Cadwallader, L.C.; Bruyere, S.A.

    2008-01-01

    Continuous air monitors (CAMs) are used to sense radioactive particulates in room air of nuclear facilities. CAMs alert personnel of potential inhalation exposures to radionuclides and can also actuate room ventilation isolation for public and environmental protection. This paper presents the results of a CAM operating experience review of the DOE Occurrence Reporting and Processing System (ORPS) database from the past 18 years. Regulations regarding these monitors are briefly reviewed. CAM location selection and operation are briefly discussed. Operating experiences reported by the U.S. Department of Energy and in other literature sources were reviewed to determine the strengths and weaknesses of these monitors. Power losses, human errors, and mechanical issues cause the majority of failures. The average 'all modes' failure rate is 2.65E-05/hr. Repair time estimates vary from an average repair time of 9 hours (with spare parts on hand) to 252 hours (without spare parts on hand). These data should support the use of CAMs in any nuclear facility, including the National Ignition Facility and the international ITER experiment

  5. e-Readiness in South African Higher Education: A Delphi study

    CSIR Research Space (South Africa)

    Pillay, K

    2017-09-01

    Full Text Available to use others. From review of existing literature, it is unclear as to which factors are regarded as important to be "e-Ready" in the South African Higher education context. In order to address this problem, a research project with the following...

  6. 'Capture ready' regulation of fossil fuel power plants - Betting the UK's carbon emissions on promises of future technology

    International Nuclear Information System (INIS)

    Markusson, Nils; Haszeldine, Stuart

    2010-01-01

    Climate change legislation requires emissions reductions, but the market shows interest in investing in new fossil fuelled power plants. The question is whether capture ready policy can reconcile these interests. The term 'capture ready' has been used a few years by the UK Government when granting licences for fossil fuelled power plants, but only recently has the meaning of the term been defined. The policy has been promoted as a step towards CCS and as an insurance against carbon lock-in. This paper draws on literature on technology lock-in and on regulation of technology undergoing development. Further, versions of the capture readiness concept proposed to date are compared. Capture readiness requirements beyond the minimum criterion of space on the site for capture operations are explored. This includes integration of capture and power plant, downstream operations, overall system integration and regulation of future retrofitting. Capture readiness comes with serious uncertainties and is no guarantee that new-built fossil plants will be abatable or abated in the future. As a regulatory strategy, it has been over-promised in the UK.

  7. Brain readiness and the nature of language.

    Science.gov (United States)

    Bouchard, Denis

    2015-01-01

    To identify the neural components that make a brain ready for language, it is important to have well defined linguistic phenotypes, to know precisely what language is. There are two central features to language: the capacity to form signs (words), and the capacity to combine them into complex structures. We must determine how the human brain enables these capacities. A sign is a link between a perceptual form and a conceptual meaning. Acoustic elements and content elements, are already brain-internal in non-human animals, but as categorical systems linked with brain-external elements. Being indexically tied to objects of the world, they cannot freely link to form signs. A crucial property of a language-ready brain is the capacity to process perceptual forms and contents offline, detached from any brain-external phenomena, so their "representations" may be linked into signs. These brain systems appear to have pleiotropic effects on a variety of phenotypic traits and not to be specifically designed for language. Syntax combines signs, so the combination of two signs operates simultaneously on their meaning and form. The operation combining the meanings long antedates its function in language: the primitive mode of predication operative in representing some information about an object. The combination of the forms is enabled by the capacity of the brain to segment vocal and visual information into discrete elements. Discrete temporal units have order and juxtaposition, and vocal units have intonation, length, and stress. These are primitive combinatorial processes. So the prior properties of the physical and conceptual elements of the sign introduce combinatoriality into the linguistic system, and from these primitive combinatorial systems derive concatenation in phonology and combination in morphosyntax. Given the nature of language, a key feature to our understanding of the language-ready brain is to be found in the mechanisms in human brains that enable the unique

  8. Brain readiness and the nature of language

    Directory of Open Access Journals (Sweden)

    Denis eBouchard

    2015-09-01

    Full Text Available To identify the neural components that make a brain ready for language, it is important to have well defined linguistic phenotypes, to know precisely what language is. There are two central features to language: the capacity to form signs (words, and the capacity to combine them into complex structures. We must determine how the human brain enables these capacities.A sign is a link between a perceptual form and a conceptual meaning. Acoustic elements and content elements, are already brain-internal in non-human animals, but as categorical systems linked with brain-external elements. Being indexically tied to objects of the world, they cannot freely link to form signs. A crucial property of a language-ready brain is the capacity to process perceptual forms and contents offline, detached from any brain-external phenomena, so their representations may be linked into signs. These brain systems appear to have pleiotropic effects on a variety of phenotypic traits and not to be specifically designed for language.Syntax combines signs, so the combination of two signs operates simultaneously on their meaning and form. The operation combining the meanings long antedates its function in language: the primitive mode of predication operative in representing some information about an object. The combination of the forms is enabled by the capacity of the brain to segment vocal and visual information into discrete elements. Discrete temporal units have order and juxtaposition, and vocal units have intonation, length, and stress. These are primitive combinatorial processes. So the prior properties of the physical and conceptual elements of the sign introduce combinatoriality into the linguistic system, and from these primitive combinatorial systems derive concatenation in phonology and combination in morphosyntax.Given the nature of language, a key feature to our understanding of the language-ready brain is to be found in the mechanisms in human brains that

  9. Career Readiness: Has Its Time Finally Come?

    Science.gov (United States)

    DeWitt, Stephen

    2012-01-01

    In 2010, the Association for Career and Technical Education (ACTE) released a "What Is Career Ready?" definition. As the career-readiness definition explains, there is much overlap between "college readiness" and "career readiness," but academic preparedness for college alone is not enough to be truly career-ready.…

  10. Maintenance-Ready Web Application Development

    Directory of Open Access Journals (Sweden)

    Ion IVAN

    2016-01-01

    Full Text Available The current paper tackles the subject of developing maintenance-ready web applications. Maintenance is presented as a core stage in a web application’s lifecycle. The concept of maintenance-ready is defined in the context of web application development. Web application maintenance tasks types are enunciated and suitable task types are identified for further analysis. The research hypothesis is formulated based on a direct link between tackling maintenance in the development stage and reducing overall maintenance costs. A live maintenance-ready web application is presented and maintenance related aspects are highlighted. The web application’s features, that render it maintenance-ready, are emphasize. The cost of designing and building the web-application to be maintenance-ready are disclosed. The savings in maintenance development effort facilitated by maintenance ready features are also disclosed. Maintenance data is collected from 40 projects implemented by a web development company. Homogeneity and diversity of collected data is evaluated. A data sample is presented and the size and comprehensive nature of the entire dataset is depicted. Research hypothesis are validated and conclusions are formulated on the topic of developing maintenance-ready web applications. The limits of the research process which represented the basis for the current paper are enunciated. Future research topics are submitted for debate.

  11. Organization, Management and Function of International Space Station (ISS) Multilateral Medical Operations

    Science.gov (United States)

    Duncan, James M.; Bogomolov, V. V.; Castrucci, F.; Koike, Y.; Comtois, J. M.; Sargsyan, A. E.

    2007-01-01

    Long duration crews have inhabited the ISS since November of 2000. The favorable medical outcomes of its missions can be largely attributed to sustained collective efforts of all ISS Partners medical organizations. In-flight medical monitoring and support, although crucial, is just a component of the ISS system of Joint Medical Operations. The goal of this work is to review the principles, design, and function of the multilateral medical support of the ISS Program. The governing documents, which describe the relationships among all ISS partner medical organizations, were evaluated, followed by analysis of the roles, responsibilities, and decision-making processes of the ISS medical boards, panels, and working groups. The degree of integration of the medical support system was evaluated by reviewing the multiple levels of the status reviews and mission assurance activities carried out throughout the last six years. The Integrated Medical Group, consisting of physicians and other essential personnel in the mission control centers represents the front-line medical support of the ISS. Data from their day-to-day activities are presented weekly at the Space Medicine Operations Team (SMOT), where known or potential concerns are addressed by an international group of physicians. A broader status review is conducted monthly to project the state of crew health and medical support for the following month, and to determine measures to return to nominal state. Finally, a comprehensive readiness review is conducted during preparations for each ISS mission. The Multilateral Medical Policy Board (MMPB) issues medical policy decisions and oversees all health and medical matters. The Multilateral Space Medicine Board (MSMB) certifies crewmembers and visitors for training and space flight to the Station, and physicians to practice space medicine for the ISS. The Multilateral Medical Operations Panel (MMOP) develops medical requirements, defines and supervises implementation of

  12. Remedial action and waste disposal project: 100-B/C remedial action readiness evaluation plan

    International Nuclear Information System (INIS)

    April, J.G.; Bryant, D.L.; Cislo, G.B.

    1996-06-01

    The Readiness Evaluation Plan presents the methodology used to assess the readiness of the 100-B/C Remedial Action Project. The 100 Areas Remedial Action Project will remediate the 100 Areas liquid waste site identified in the Interim Action Record of Decision for the 100- BC-1, 100-DR-1, and 100-HR-1 Operable Units. These sites are located in the 100 Area of the Hanford Site in Richland, Washington

  13. Review and updates of the risk assessment for advanced test reactor operations for operating events and experience

    International Nuclear Information System (INIS)

    Atkinson, S.A.

    1996-01-01

    Annual or biannual reviews of the operating history of the Advanced Test Reactor (ATR) at the Idaho National Engineering Laboratory (INEL) have been conducted for the purpose of reviewing and updating the ATR probabilistic safety assessment (PSA) for operating events and operating experience since the first compilation of plant- specific experience data for the ATR PSA which included data for operation from initial power operation in 1969 through 1988. This technical paper briefly discusses the means and some results of these periodic reviews of operating experience and their influence on the ATR PSA

  14. Rapid Assessment of Individual Soldier Operational Readiness Final Report CRADA No. TC02104.0

    Energy Technology Data Exchange (ETDEWEB)

    Turteltaub, K. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Mapes, J. [Rules Based Medicine, Inc., Austin, TX (United States)

    2017-09-08

    This was a collaborative effort between Lawrence Livermore National Security (LLNS) (formerly The Regents of the University of California), Lawrence Livermore National Laboratory (LLNL) and Rules Based Medicine, Inc. {RBM), to identify markers in blood that would be candidates for determining the combat readiness of troops.

  15. Solar Ready: An Overview of Implementation Practices

    Energy Technology Data Exchange (ETDEWEB)

    Watson, A.; Guidice, L.; Lisell, L.; Doris, L.; Busche, S.

    2012-01-01

    This report explores three mechanisms for encouraging solar ready building design and construction: solar ready legislation, certification programs for solar ready design and construction, and stakeholder education. These methods are not mutually exclusive, and all, if implemented well, could contribute to more solar ready construction. Solar ready itself does not reduce energy use or create clean energy. Nevertheless, solar ready building practices are needed to reach the full potential of solar deployment. Without forethought on incorporating solar into design, buildings may be incompatible with solar due to roof structure or excessive shading. In these cases, retrofitting the roof or removing shading elements is cost prohibitive. Furthermore, higher up-front costs due to structural adaptations and production losses caused by less than optimal roof orientation, roof equipment, or shading will lengthen payback periods, making solar more expensive. With millions of new buildings constructed each year in the United States, solar ready can remove installation barriers and increase the potential for widespread solar adoption. There are many approaches to promoting solar ready, including solar ready legislation, certification programs, and education of stakeholders. Federal, state, and local governments have the potential to implement programs that encourage solar ready and in turn reduce barriers to solar deployment. With the guidance in this document and the examples of jurisdictions and organizations already working to promote solar ready building practices, federal, state, and local governments can guide the market toward solar ready implementation.

  16. NCEP Central Operations

    Science.gov (United States)

    ) NCO Organizational Chart NOAA's Weather and Climate Operational Supercomputing System is known as Climate Climate Prediction Climate Archives Weather Safety Storm Ready NOAA Central Library Photo Library NCO's MISSION * Execute the NCEP operational model suite - Create climate, weather, ocean, space and

  17. An assessment of the readiness for introduction of the HPV vaccine ...

    African Journals Online (AJOL)

    Formative research assessing human papillomavirus (HPV) vaccine readiness in Uganda was conducted in 2007. The objective was to generate evidence for government decision-making and operational planning for HPV vaccine introduction. Qualitative research methods with children, parents, teachers, community ...

  18. JWST Wavefront Sensing and Control: Operations Plans, Demonstrations, and Status

    Science.gov (United States)

    Perrin, Marshall; Acton, D. Scott; Lajoie, Charles-Philippe; Knight, J. Scott; Myers, Carey; Stark, Chris; JWST Wavefront Sensing & Control Team

    2018-01-01

    After JWST launches and unfolds in space, its telescope optics will be aligned through a complex series of wavefront sensing and control (WFSC) steps to achieve diffraction-limited performance. This iterative process will comprise about half of the observatory commissioning time (~ 3 out of 6 months). We summarize the JWST WFSC process, schedule, and expectations for achieved performance, and discuss our team’s activities to prepare for an effective & efficient telescope commissioning. During the recently-completed OTIS cryo test at NASA JSC, WFSC demonstrations showed the flight-like operation of the entire JWST active optics and WFSC system from end to end, including all hardware and software components. In parallel, the same test data were processed through the JWST Mission Operations Center at STScI to demonstrate the readiness of ground system components there (such as the flight operations system, data pipelines, archives, etc). Moreover, using the Astronomer’s Proposal Tool (APT), the entire telescope commissioning program has been implemented, reviewed, and is ready for execution. Between now and launch our teams will continue preparations for JWST commissioning, including further rehearsals and testing, to ensure a successful alignment of JWST’s telescope optics.

  19. Costs of a Hospital-Based, Ready-To-Use Syringe Delivery Programme

    DEFF Research Database (Denmark)

    Risør, Bettina Wulff; Vand, S; Lisby, M

    2017-01-01

    %) and at €20,905 (an increase of 228%) for the endoscopy department. The ready-to-use delivery program imposed an additional cost of €11.32 per day surgery operation and €2.41 per endoscopy procedure. Conclusion: This ready-to-use programme increased the cost of the medical handling process. This incremental......Objective: The risk of errors in the medication administration process is high. Applications of pre lled syringes may improve patient safety but could be more costly. The objective of this study was to assess the additional costs of a ready-to-use syringe delivery programme in comparison...... with a conventional delivery programme at day surgery and endoscopy departments at a large university hospital. Methods: The cost analysis used the hospital perspective and developed an “activity-based costing” model to assess the costs of medicine- handling activities. The model was calibrated with six-month data...

  20. Capture ready study

    Energy Technology Data Exchange (ETDEWEB)

    Minchener, A.

    2007-07-15

    There are a large number of ways in which the capture of carbon as carbon dioxide (CO{sub 2}) can be integrated into fossil fuel power stations, most being applicable for both gas and coal feedstocks. To add to the choice of technology is the question of whether an existing plant should be retrofitted for capture, or whether it is more attractive to build totally new. This miscellany of choices adds considerably to the commercial risk of investing in a large power station. An intermediate stage between the non-capture and full capture state would be advantageous in helping to determine the best way forward and hence reduce those risks. In recent years the term 'carbon capture ready' or 'capture ready' has been coined to describe such an intermediate stage plant and is now widely used. However a detailed and all-encompassing definition of this term has never been published. All fossil fuel consuming plant produce a carbon dioxide gas byproduct. There is a possibility of scrubbing it with an appropriate CO{sub 2} solvent. Hence it could be said that all fossil fuel plant is in a condition for removal of its CO{sub 2} effluent and therefore already in a 'capture ready' state. Evidently, the practical reality of solvent scrubbing could cost more than the rewards offered by such as the ETS (European Trading Scheme). In which case, it can be said that although the possibility exists of capturing CO{sub 2}, it is not a commercially viable option and therefore the plant could not be described as ready for CO{sub 2} capture. The boundary between a capture ready and a non-capture ready condition using this definition cannot be determined in an objective and therefore universally acceptable way and criteria must be found which are less onerous and less potentially contentious to assess. 16 refs., 2 annexes.

  1. Operating experience and aging-seismic assessment of electric motors

    International Nuclear Information System (INIS)

    Subudhi, M.; Burns, E.L.; Taylor, J.H.

    1985-06-01

    Objectives of this program are to identify concerns related to the aging and service wear of equipment operating in nuclear power plants, to assess their possible impact on plant safety, to identify effective inspection surveillance and monitoring methods and to recommend suitable maintenance practices for mitigating aging related concerns and diminish the rate of degradation due to aging and service wear. Motor design and materials of construction are reviewed to identify age-sensitive components. Operational and accidental stressors are determined, and their effect on promoting aging degradation is assessed. Failure modes, mechanisms, and causes have been reviewed from operating experiences and existing data banks. The study has also included consideration for the seismic correlation of age-degraded motor components. The aforementioned reviews and assessments were assimilated to characterize the dielectric, rotational, and mechanical hazards on motor performance and operational readiness. The functional indicators which can be monitored to assess motor component deterioration due to aging or other accidental stressors are identified. Conforming with the NPAR strategy as outlined in the program plan, the study also includes a preliminary discussion of current standards and guides, maintenance programs, and research activities pertaining to nuclear power plant safety-related electric motors

  2. Readiness for Living Technology

    DEFF Research Database (Denmark)

    Peronard, Jean-Paul

    2013-01-01

    This paper is a comparative analysis between workers in healthcare with high and low degree of readiness for living technology such as robotics. To explore the differences among workers’ readiness for robotics in healthcare, statistical analysis was conducted in the data set obtained from 200...

  3. Critical analysis of e-health readiness assessment frameworks: suitability for application in developing countries.

    Science.gov (United States)

    Mauco, Kabelo Leonard; Scott, Richard E; Mars, Maurice

    2018-02-01

    Introduction e-Health is an innovative way to make health services more effective and efficient and application is increasing worldwide. e-Health represents a substantial ICT investment and its failure usually results in substantial losses in time, money (including opportunity costs) and effort. Therefore it is important to assess e-health readiness prior to implementation. Several frameworks have been published on e-health readiness assessment, under various circumstances and geographical regions of the world. However, their utility for the developing world is unknown. Methods A literature review and analysis of published e-health readiness assessment frameworks or models was performed to determine if any are appropriate for broad assessment of e-health readiness in the developing world. A total of 13 papers described e-health readiness in different settings. Results and Discussion Eight types of e-health readiness were identified and no paper directly addressed all of these. The frameworks were based upon varying assumptions and perspectives. There was no underlying unifying theory underpinning the frameworks. Few assessed government and societal readiness, and none cultural readiness; all are important in the developing world. While the shortcomings of existing frameworks have been highlighted, most contain aspects that are relevant and can be drawn on when developing a framework and assessment tools for the developing world. What emerged is the need to develop different assessment tools for the various stakeholder sectors. This is an area that needs further research before attempting to develop a more generic framework for the developing world.

  4. Design/Operations review of core sampling trucks and associated equipment

    International Nuclear Information System (INIS)

    Shrivastava, H.P.

    1996-01-01

    A systematic review of the design and operations of the core sampling trucks was commissioned by Characterization Equipment Engineering of the Westinghouse Hanford Company in October 1995. The review team reviewed the design documents, specifications, operating procedure, training manuals and safety analysis reports. The review process, findings and corrective actions are summarized in this supporting document

  5. LHCf: ready to go

    CERN Multimedia

    CERN Bulletin

    2015-01-01

    Reinstalled in the tunnel at the end of 2014, the two detectors of the LHCf experiment are now ready for operation. The first data should be taken in May.   LHCf’s Arm1 detector. The Large Hadron Collider forward (LHCf) experiment measures neutral particles emitted at nearly zero degrees from the proton beam direction. Because these "very forward" particles carry a large fraction of the collision energy, they are important for understanding the development of atmospheric air-shower phenomena produced by high-energy cosmic rays. To measure these particles, two detectors, Arm1 and Arm2, sit along the LHC beamline, at 140 metres either side of the ATLAS collision point. In July 2010, after a 9-month operation, the LHCf collaboration removed the two detectors from the tunnel to avoid severe radiation damage. The Arm2 detector was reinstalled in the tunnel for data-taking with proton–lead collisions in 2013, while Arm1 was being upgraded to be a radiation-ha...

  6. 33 CFR 150.531 - How many fire pumps must be kept ready for use at all times?

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false How many fire pumps must be kept ready for use at all times? 150.531 Section 150.531 Navigation and Navigable Waters COAST GUARD... Specialty Equipment Miscellaneous Operations § 150.531 How many fire pumps must be kept ready for use at all...

  7. Market readiness update : updated status of preparations for Ontario's competitive retail electricity market

    International Nuclear Information System (INIS)

    2002-01-01

    The Market Readiness Project Team of the Ontario Energy Board (OEB) is instrumental in ensuring the readiness of retail participants in Ontario's competitive electricity market. The team, led by the Independent Electricity Market Operator (IMO), provides information and advice regarding the technical readiness of the retail industry, with particular focus on the readiness of distributors to carry out their roles in a competitive market. This report provides an assessment of the team regarding the industry's technical readiness based on information as of April 24, 2002. In January 2002, the Ontario Government announced that it would open the electricity industry to competition on May 1, 2002. 54 of Ontario's 94 licensed electricity distributors claimed they were ready to offer retail choice by May 1. As of March 2002, about 858,000 customers (or 20 per cent of Ontario's 4.2 million customers) had signed a retail electricity contract with one of 9 active electricity retailers. By April 2002, 73 distributors, representing 93 per cent of Ontario's customers signed a contract with a retailer. Those customers who choose not to sign a contract will continue to receive service from their distributor but at energy prices set hourly by the IMO. It is expected that after May 1, the transition to a competitive market will proceed for several weeks as distributors progress through their billing cycles. 7 tabs., 2 figs

  8. Evidence based practice readiness: A concept analysis.

    Science.gov (United States)

    Schaefer, Jessica D; Welton, John M

    2018-01-15

    To analyse and define the concept "evidence based practice readiness" in nurses. Evidence based practice readiness is a term commonly used in health literature, but without a clear understanding of what readiness means. Concept analysis is needed to define the meaning of evidence based practice readiness. A concept analysis was conducted using Walker and Avant's method to clarify the defining attributes of evidence based practice readiness as well as antecedents and consequences. A Boolean search of PubMed and Cumulative Index for Nursing and Allied Health Literature was conducted and limited to those published after the year 2000. Eleven articles met the inclusion criteria for this analysis. Evidence based practice readiness incorporates personal and organisational readiness. Antecedents include the ability to recognize the need for evidence based practice, ability to access and interpret evidence based practice, and a supportive environment. The concept analysis demonstrates the complexity of the concept and its implications for nursing practice. The four pillars of evidence based practice readiness: nursing, training, equipping and leadership support are necessary to achieve evidence based practice readiness. Nurse managers are in the position to address all elements of evidence based practice readiness. Creating an environment that fosters evidence based practice can improve patient outcomes, decreased health care cost, increase nurses' job satisfaction and decrease nursing turnover. © 2018 John Wiley & Sons Ltd.

  9. Self-perceived readiness to perform at the attending level following surgical specialist training in Denmark

    DEFF Research Database (Denmark)

    Fabricius, Rasmus; Sillesen, Martin; Hansen, Morten Sejer

    2017-01-01

    not previously been studied. In the present study, we aim to investigate the role of supervision in the national surgical residency programme and the self-perceived readiness to undertake the role of a specialist doctor in gastrointestinal surgery in a cohort of gastrointestinal surgeons graduating in 2012......: A total of 30 graduated residents (55%) responded to the Danish survey. Among those, 14 (47%) felt ready to be a specialist in surgery. A total of 25 (83%) answered that increased supervision would have increased their selfperceived competencies to serve as a surgical specialist. Self -perceived readiness...... was significantly associated with level of supervision during surgical training (p = 0.02), whereas no association with operative volume could be established. CONCLUSIONS: A worryingly high number of graduates did not feel ready to undertake their role as a gastrointestinal surgical specialist. Adequate supervision...

  10. Review of operating history at the Palisades Nuclear Plant

    International Nuclear Information System (INIS)

    Mays, G.T.; Harrington, K.H.

    1982-01-01

    the Systematic Evaluation Program Branch (SEPB) of the Nuclear Regulatory Commission (NRC) is conducting the Systematic Evaluation Program whose purpose is to determine the safety margins of the design and operation of the eleven oldest operating commercial nuclear power plants in the United States. A portion of the SEP includes the compilation and interpretation of operational occurrences at these plants. This summary describes the methodology and results of the operational experience review of Palisades Nuclear Plant. The review includes a detailed examination of the operating experience in two segments - plant shutdowns and power reductions, and reportable events

  11. Guidelines for the Interpretation of Results of Microbiological Testing of Ready-to-Eat Foods Placed on the Market (Revision 2)

    OpenAIRE

    Food Safety Authority of Ireland

    2016-01-01

    This document provides guideline microbiological limits for ready-to-eat foods placed on the market. These guideline limits can be used if legal microbiological criteria (Appendix 1) do not exist for a particular combination of food and microorganism. This Guidance Note is intended to be used by: • Food business operators • Enforcement officers, and • Laboratories performing microbiological testing on ready-to-eat foods Food business operators may also use the limits prese...

  12. Review of decision aids for nuclear-plant operators

    International Nuclear Information System (INIS)

    Kisner, R.A.

    1983-01-01

    Responses to various computer-based operational aids varied widely in detail, thus forcing distillation of the salient features of many operational aids from information sources other than the initial questionnaire. These sources included technical and management presentations, technical papers and reports, personal discussions, taped responses, sales brochures, system specifications and schematics, and other documents. The data base is dynamic, not static, owing to the nature of current trends in operational aid development. The information contained in it is subject to review and revision by the developing organizations. More systems are pending review and entry into the data base; hence the list is incomplete

  13. Maintenance action readiness assessment plan for White Oak Creek and Melton Branch Weir Stilling Pool cleanout at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    1995-08-01

    This Readiness Assessment Plan has been prepared to document operational readiness for the following maintenance action: (1) removal of sediment from the White Oak Creek and Melton Branch Weir Stilling Pools and (2) disposal of the radiologically contaminated sediment in another location upstream of the weirs in an area previously contaminated by stream overflow from Melton Branch in Waste Area Grouping 2 (WAG) at Oak Ridge National Laboratory. This project is being performed as a maintenance action rather than an action under the Comprehensive Environmental Response, Compensation, and Liability Act because the risk to human health and environment is well below the US Environmental Protection Agency's level of concern. The decision to proceed as a maintenance action was documented by an interim action proposed plan, which is included in the administrative record. The administrative record is available for review at the US Department of Energy Information Resource Center, 105 Broadway Avenue, Oak Ridge, Tennessee 37830

  14. Individual motivation and threat indicators of collaboration readiness in scientific knowledge producing teams: a scoping review and domain analysis

    Directory of Open Access Journals (Sweden)

    Gaetano R. Lotrecchiano

    2016-05-01

    Full Text Available This paper identifies a gap in the team science literature that considers intrapersonal indicators of collaboration as motivations and threats to participating in collaborative knowledge producing teams (KPTs. Through a scoping review process, over 150 resources were consulted to organize 6 domains of motivation and threat to collaboration in KPTs: Resource Acquisition, Advancing Science, Building Relationships, Knowledge Transfer, Recognition and Reward, and Maintenance of Beliefs. Findings show how domains vary in their presentation of depth and diversity of motivation and threat indicators as well as their relationship with each other within and across domains. The findings of 51 indicators resulting from the review provide a psychosocial framework for which to establish a hierarchy of collaborative reasoning for individual engagement in KPTs thus allowing for further research into the mechanism of collaborative engagement. The indicators serve as a preliminary step in establishing a protocol for testing of the psychometric properties of intrapersonal measures of collaboration readiness.

  15. Independent Review of Elemental Phosphorus Remediation at the Eastern Michaud Flats FMC Operable Unit near Pocatello, Idaho

    Energy Technology Data Exchange (ETDEWEB)

    Martino, L. E. [Argonne National Lab. (ANL), Argonne, IL (United States); Jerden, J. J. [Argonne National Lab. (ANL), Argonne, IL (United States); Kimmell, T. A. [Argonne National Lab. (ANL), Argonne, IL (United States); Quinn, J. [Argonne National Lab. (ANL), Argonne, IL (United States)

    2016-01-01

    If, despite risks to workers and these potential impacts, stakeholders decide that P4 wastes need to be excavated and treated, the Review Team determined that a number of the ETTs examined warrant further consideration for the treatment of P4 waste that has been characterized (for example, P4 waste present in the historical ponds). Nevertheless, concerns about the health and safety of site investigation workers using then-available investigation approaches prevented the collection of subsurface samples containing P4 from large areas of the site (e.g., the railroad swale, the vadose zone beneath the Furnace Building, and the abandoned railcars), As a result, the contaminant CSM in those particular areas was not refined enough to allow the Review Team to draw conclusions about using some of the ETTs to treat P4 waste in those areas. The readiness of an ETT for implementation varies depending on many factors, including stakeholder input, permitting, and remedial action construction requirements. Technologies that could be ready for use in the near term (within 1 year) include the following: mechanical excavation, containment technologies, off-site incineration, and drying and mechanical mixing under a tent structure. Technologies that could be ready for use in the mid-term (1 to 2 years) include cutter suction dredging, thermal-hydraulic dredging, and underground pipeline cleaning technologies. Technologies requiring a longer lead time (2 to 5 years) include on-site incineration, a land disposal restriction waste treatment system, an Albright & Wilson batch mud still, post-treatment on-site disposal, and post-treatment off-site disposal.

  16. Integrating technology readiness into the expectation-confirmation model: an empirical study of mobile services.

    Science.gov (United States)

    Chen, Shih-Chih; Liu, Ming-Ling; Lin, Chieh-Peng

    2013-08-01

    The aim of this study was to integrate technology readiness into the expectation-confirmation model (ECM) for explaining individuals' continuance of mobile data service usage. After reviewing the ECM and technology readiness, an integrated model was demonstrated via empirical data. Compared with the original ECM, the findings of this study show that the integrated model may offer an ameliorated way to clarify what factors and how they influence the continuous intention toward mobile services. Finally, the major findings are summarized, and future research directions are suggested.

  17. Readiness assessment plan for the Radioactive Mixed Waste Land Disposal Facility (Trench 31)

    International Nuclear Information System (INIS)

    Irons, L.G.

    1994-01-01

    This document provides the Readiness Assessment Plan (RAP) for the Project W-025 (Radioactive Mixed Waste Land Disposal Facility) Readiness Assessment (RA). The RAP documents prerequisites to be met by the operating organization prior to the RA. The RAP is to be implemented by the RA Team identified in the RAP. The RA Team is to verify the facility's compliance with criteria identified in the RAP. The criteria are based upon the open-quotes Core Requirementsclose quotes listed in DOE Order 5480.31, open-quotes Startup and Restart of Nuclear Facilitiesclose quotes

  18. The development of an online decision support tool for organizational readiness for change.

    Science.gov (United States)

    Khan, Sobia; Timmings, Caitlyn; Moore, Julia E; Marquez, Christine; Pyka, Kasha; Gheihman, Galina; Straus, Sharon E

    2014-05-10

    Much importance has been placed on assessing readiness for change as one of the earliest steps of implementation, but measuring it can be a complex and daunting task. Organizations and individuals struggle with how to reliably and accurately measure readiness for change. Several measures have been developed to help organizations assess readiness, but these are often underused due to the difficulty of selecting the right measure. In response to this challenge, we will develop and test a prototype of a decision support tool that is designed to guide individuals interested in implementation in the selection of an appropriate readiness assessment measure for their setting. A multi-phase approach will be used to develop the decision support tool. First, we will identify key measures for assessing organizational readiness for change from a recently completed systematic review. Included measures will be those developed for healthcare settings (e.g., acute care, public health, mental health) and that have been deemed valid and reliable. Second, study investigators and field experts will engage in a mapping exercise to categorize individual items of included measures according to key readiness constructs from an existing framework. Third, a stakeholder panel will be recruited and consulted to determine the feasibility and relevance of the selected measures using a modified Delphi process. Fourth, findings from the mapping exercise and stakeholder consultation will inform the development of a decision support tool that will guide users in appropriately selecting change readiness measures. Fifth, the tool will undergo usability testing. Our proposed decision support tool will address current challenges in the field of organizational change readiness by aiding individuals in selecting a valid and reliable assessment measure that is relevant to user needs and practice settings. We anticipate that implementers and researchers who use our tool will be more likely to conduct

  19. From Readiness to Action: How Motivation Works

    Directory of Open Access Journals (Sweden)

    Kruglanski Arie W.

    2014-09-01

    Full Text Available We present a new theoretical construct labeled motivational readiness. It is defined as the inclination, whether or not ultimately implemented, to satisfy a desire. A general model of readiness is described which builds on the work of prior theories, including animal learning models and personality approaches, and which aims to integrate a variety of research findings across different domains of motivational research. Components of this model include the Want state (that is, an individual’s currently active desire, and the Expectancy of being able to satisfy that Want. We maintain that the Want concept is the critical ingredient in motivational readiness: without it, readiness cannot exist. In contrast, some motivational readiness can exist without Expectancy. We also discuss the role of incentive in motivational readiness. Incentive is presently conceived of in terms of a Match between a Want and a Perceived Situational Affordance. Whereas in classic models incentive was portrayed as a first order determinant of motivational readiness, here we describe it as a second order factor which affects readiness by influencing Want, Expectancy, or both. The new model’s relation to its theoretical predecessors, and its implications for future research, also are discussed.

  20. FORMING THE READINESS OF UNIVERSITY TEACHERS TO WORK IN POSTGRADUATE PEDAGOGICAL EDUCATION

    Directory of Open Access Journals (Sweden)

    Iryna Trubavina

    2017-04-01

    Full Text Available The problem of teaching adult students in the system of postgraduate pedagogical education should be considered not only from the point of view of the students, but also from the point of teachers’ view. Training is a two-way process. In this article national studies on this problem are initially summarized. The methodology of research of postgraduate pedagogical education is singled out. These are such scientific approaches as synergetics and andragogics. The author proves the need for universities to train teachers specially for interaction with adult students who already work as teachers in schools, have very much motivation for study, their own personal and professional experience, may be older than their university teachers, require subject-subject communication. This all affects the specifics of teaching and requires a different willingness to work with such students and correspondent courses at universities. The article is devoted to forming modern university teachers’ readiness to work in postgraduate pedagogical education. The features of such readiness content are first determined by the author as the content, value and operational components of teacher readiness for work. This gives the article practical significance. The results can be extended to the training of all teachers of higher pedagogical educational institutions, that indicate the social significance of the article. The originality of the article is determining the specific content of the components of the teachers’ readiness to work in postgraduate pedagogical education. Forming the teacher’s readiness for training adult students in the system of postgraduate teacher education should include knowledge, skills and values of work. The prospects for research are building and implementing a model of forming the university teachers’ readiness for such work on the basis of andragogy and synergetics, taking into account the specified content of the components of teacher

  1. High Performance Computing Operations Review Report

    Energy Technology Data Exchange (ETDEWEB)

    Cupps, Kimberly C. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2013-12-19

    The High Performance Computing Operations Review (HPCOR) meeting—requested by the ASC and ASCR program headquarters at DOE—was held November 5 and 6, 2013, at the Marriott Hotel in San Francisco, CA. The purpose of the review was to discuss the processes and practices for HPC integration and its related software and facilities. Experiences and lessons learned from the most recent systems deployed were covered in order to benefit the deployment of new systems.

  2. Recent operating experience and improvement of commercial IGCC

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-09-01

    IGCC has today reached a status where experience is available from first and second generation plants, built in the 1970s/1980s and in the 1990s respectively, as commercial-scale demonstration plants for coal-based applications. These plants feature variations on gasification technology and subsequent environmental controls and in operating them a number of technical and commercial lessons have been learned that will help to improve the next generation of IGCC projects. The report reviews and summarises the state-of-the-art and operating experience of several commercial IGCC plants worldwide, setting out the lessons learned and plans for future development embracing such issues as the changes or modifications to plant made to overcome the operational problems and to improve the reliability and availability of the plant. Since IGCC is considered a 'capture ready' technology for CO2 abatement, the current status with regard to the incorporation of carbon capture and storage systems (CCS) has been reviewed. Finally, the report outlines the issues associated with assessing the risks in commercialising IGCC plant.

  3. Factors of children's school readiness

    Directory of Open Access Journals (Sweden)

    Ljubica Marjanovič Umek

    2006-12-01

    Full Text Available The purpose of the study was to examine the effect of preschool on children's school readiness in connection with their intellectual abilities, language competence, and parents' education. The sample included 219 children who were 68 to 83 months old and were attending the first year of primary school. Children were differentiated by whether or not they had attended preschool before starting school. Children's intellectual ability was determined using Raven's Coloured Progressive Matrices (CPM; Raven, Raven, & Court, 1999, language competence using the Lestvice splošnega govornegarazvoja–LJ (LSGR–LJ, Scales of General Language Development; Marjanovič Umek, Kranjc, Fekonja in Bajc, 2004, and school readiness with the Preizkus pripravljenosti za šolo (PPŠ, Test of School Readiness; Toličič, 1986. The results indicate that children's intellectual ability and language competence have a high predictive value for the school readiness — they explained 51% of the variance in children's scores on the PPŠ. Preschool enrollment has a positive effect on school readiness for children whose parents have a low level of education, but not for those whose parents are highly educated.

  4. Providing a Framework for E-readiness Assessment and Action for E-Commerce in Ramak Dairy Company in Shiraz

    Directory of Open Access Journals (Sweden)

    Ali Mohammadi

    2016-12-01

    Full Text Available This study aimed to provide a framework to assess the e-readiness of Ramak Company in Shiraz. To that end, after reviewing the related literature in the field of e-readiness and selecting the proper model, the model parameters were distributed among experts in the form of a questionnaire, and with the help of fuzzy screening, 49 indicators were finalized. Then, using the combination method of DEMATEL and Analysis of Network process, weight of the indicators was obtained. Finally, e-readiness of the indicators was investigated through proper statistical tests. The analysis indicated that the company had necessary preparation in the following indicators “market share of company” and “compliance with quality of ICT international standards”, “high bandwidth availability” and “diversity of communication channels available”, “quality of national wide ICT infrastructures” and “obstacles of trade investment” and any other observation. By doing the gap analysis, it was found that the dimensions of external environment readiness, the ICT readiness and external environment readiness, respectively had the highest priorities for enforcement action.

  5. Occurrence of Campylobacter spp. in raw and ready-to-eat foods and in a Canadian food service operation.

    Science.gov (United States)

    Medeiros, Diane T; Sattar, Syed A; Farber, Jeffrey M; Carrillo, Catherine D

    2008-10-01

    The occurrence of Campylobacter spp. in a variety of foods from Ottawa, Ontario, Canada, and raw milk samples from across Canada was determined over a 2-year period. The samples consisted of 55 raw foods (chicken, pork, and beef), 126 raw milk samples from raw milk cheese manufacturers, and 135 ready-to-eat foods (meat products, salads, and raw milk cheeses). Campylobacter jejuni was detected in 4 of the 316 samples analyzed: 1 raw beef liver sample and 3 raw chicken samples. An isolation rate of 9.7% was observed among the raw chicken samples tested. This study also investigated the role of cross-contamination in disseminating Campylobacter from raw poultry within a food service operation specializing in poultry dishes. Accordingly, kitchen surfaces within a restaurant in Ottawa, Ontario, were sampled between March and August 2001. Tests of the sampling method indicated that as few as 100 Campylobacter cells could be detected if sampling was done within 45 min of inoculation; however, Campylobacter spp. were not detected in 125 swabs of surfaces within the kitchens of this food service operation. Despite the reported high prevalence of Campylobacter spp. in raw poultry, this organism was not detected on surfaces within a kitchen of a restaurant specializing in poultry dishes.

  6. Stack Monitor Operating Experience Review

    International Nuclear Information System (INIS)

    Cadwallader, L.C.; Bruyere, S.A.

    2009-01-01

    Stack monitors are used to sense radioactive particulates and gases in effluent air being vented from rooms of nuclear facilities. These monitors record the levels and types of effluents to the environment. This paper presents the results of a stack monitor operating experience review of the U.S. Department of Energy (DOE) Occurrence Reporting and Processing System (ORPS) database records from the past 18 years. Regulations regarding these monitors are briefly described. Operating experiences reported by the U.S. DOE and in engineering literature sources were reviewed to determine the strengths and weaknesses of these monitors. Electrical faults, radiation instrumentation faults, and human errors are the three leading causes of failures. A representative 'all modes' failure rate is 1E-04/hr. Repair time estimates vary from an average repair time of 17.5 hours (with spare parts on hand) to 160 hours (without spare parts on hand). These data should support the use of stack monitors in any nuclear facility, including the National Ignition Facility and the international ITER project.

  7. Peer Review: Promoting Efficient School District Operations

    Science.gov (United States)

    Hale, Jason S.

    2010-01-01

    Many professions recognize the benefits of peer reviews to assess processes and operations because peers can more easily identify one another's inefficiencies and provide some kind of intervention. Generally, the goal of the peer review process is to verify whether the work satisfies the standards set by the industry. A number of states have begun…

  8. A maturity model to assess organisational readiness for change

    OpenAIRE

    Zephir, Olivier; Minel, Stéphanie; Chapotot, Emilie

    2011-01-01

    International audience; The presented model which is developed in a European project allows project management teams to assess the organisational maturity to integrate new practices under structural or technological change. Maturity for change is defined here as workforce capability to operate effectively in transformed processes. This methodology is addressed to tackle organisational readiness to fulfil business objectives through technological and structural improvements. The tool integrate...

  9. Smoking Cessation for Smokers Not Ready to Quit: Meta-analysis and Cost-effectiveness Analysis.

    Science.gov (United States)

    Ali, Ayesha; Kaplan, Cameron M; Derefinko, Karen J; Klesges, Robert C

    2018-06-11

    To provide a systematic review and cost-effectiveness analysis on smoking interventions targeting smokers not ready to quit, a population that makes up approximately 32% of current smokers. Twenty-two studies on pharmacological, behavioral, and combination smoking-cessation interventions targeting smokers not ready to quit (defined as those who reported they were not ready to quit at the time of the study) published between 2000 and 2017 were analyzed. The effectiveness (measured by the number needed to treat) and cost effectiveness (measured by costs per quit) of interventions were calculated. All data collection and analyses were performed in 2017. Smoking interventions targeting smokers not ready to quit can be as effective as similar interventions for smokers ready to quit; however, costs of intervening on this group may be higher for some intervention types. The most cost-effective interventions identified for this group were those using varenicline and those using behavioral interventions. Updating clinical recommendations to provide cessation interventions for this group is recommended. Further research on development of cost-effective treatments and effective strategies for recruitment and outreach for this group are needed. Additional studies may allow for more nuanced comparisons of treatment types among this group. Copyright © 2018 American Journal of Preventive Medicine. Published by Elsevier Inc. All rights reserved.

  10. A theory of organizational readiness for change

    Directory of Open Access Journals (Sweden)

    Weiner Bryan J

    2009-10-01

    Full Text Available Abstract Background Change management experts have emphasized the importance of establishing organizational readiness for change and recommended various strategies for creating it. Although the advice seems reasonable, the scientific basis for it is limited. Unlike individual readiness for change, organizational readiness for change has not been subject to extensive theoretical development or empirical study. In this article, I conceptually define organizational readiness for change and develop a theory of its determinants and outcomes. I focus on the organizational level of analysis because many promising approaches to improving healthcare delivery entail collective behavior change in the form of systems redesign--that is, multiple, simultaneous changes in staffing, work flow, decision making, communication, and reward systems. Discussion Organizational readiness for change is a multi-level, multi-faceted construct. As an organization-level construct, readiness for change refers to organizational members' shared resolve to implement a change (change commitment and shared belief in their collective capability to do so (change efficacy. Organizational readiness for change varies as a function of how much organizational members value the change and how favorably they appraise three key determinants of implementation capability: task demands, resource availability, and situational factors. When organizational readiness for change is high, organizational members are more likely to initiate change, exert greater effort, exhibit greater persistence, and display more cooperative behavior. The result is more effective implementation. Summary The theory described in this article treats organizational readiness as a shared psychological state in which organizational members feel committed to implementing an organizational change and confident in their collective abilities to do so. This way of thinking about organizational readiness is best suited for

  11. Tanks Focus Area midyear review report FY00

    International Nuclear Information System (INIS)

    Roeder-Smith, R.D.

    2000-01-01

    In accordance with EM's office of Science and Technology (OST), the TFA is committed to assessing the maturity of technology development projects and ensuring their readiness for implementation and subsequent deployment. The TFA conducts an annual Midyear Review to document the status of ongoing projects, reaffirm and document user commitment to selected projects, and to improve the effective deployment of technology by determining and documenting the readiness of selected projects to move ahead. Since 1995, OST has used a linear technology maturation model that spans through seven defined stages of maturity, from basic research to implementation. Application of this Stage/Gate model to technology development resulted in prescriptive and somewhat cumbersome review procedures, resulting in limited and inconsistent use. Subsequently, in February 2000, OST issued revised guidance in an effort to streamline the technology tracking and review process. While the new OST guidance reinforces peer review requirements and the use of the American Society of Mechanical Engineers (ASME) for independent reviews, it also implements a simplified Gate model. The TFA is now responsible for providing auditable documentation for passing only three stages of technology maturity: ready for research (Gate 0); ready for development (Gate 2); ready for demonstration (Gate 5). The TFA Midyear Review is a key element in the overall review procedure, as the tracking evidence for all active projects is required to be available at this time. While the Midyear Report contains an overview of the status of all TFA reviews and projects, not all the reviews were conducted during the Midyear Review. The TFA used a phased approach to accomplish the Midyear Review requirements

  12. Magnet operating experience review for fusion applications

    International Nuclear Information System (INIS)

    Cadwallader, L.C.

    1991-11-01

    This report presents a review of magnet operating experiences for normal-conducting and superconducting magnets from fusion, particle accelerator, medical technology, and magnetohydrodynamics research areas. Safety relevant magnet operating experiences are presented to provide feedback on field performance of existing designs and to point out the operational safety concerns. Quantitative estimates of magnet component failure rates and accident event frequencies are also presented, based on field experience and on performance of similar components in other industries

  13. Safety related experience in FFTF startup and operation

    International Nuclear Information System (INIS)

    Peterson, R.E.; Halverson, T.G.; Daughtry, J.W.

    1982-06-01

    The Fast Flux Test Facility (FFTF) is a 400 MW(t) sodium cooled fast reactor operating at the Hanford Engineering Development Laboratory, Richland, Washington, to conduct fuels and materials testing in support of the US LMFBR program. Startup and initial power ascension testing of the facility involved a comprehensive series of readiness reviews and acceptance tests, many of which relate to the inherent safety of the plant. Included are physics measurements, natural circulation, integrated containment leakage, shielding effectiveness, fuel failure detection, and plant protection system tests. Described are the measurements taken to confirm the design safety margins upon which the operating authorization of the plant was based. These measurements demonstrate that large margins of safety are available in the FFTF design

  14. Using Positive Behavior Support Procedures in Head Start Classrooms to Improve School Readiness: A Group Training and Behavioral Coaching Model

    Science.gov (United States)

    Feil, Edward G.; Walker, Hill; Severson, Herbert; Golly, Annemieke; Seeley, John R.; Small, Jason W.

    2009-01-01

    Social-emotional competence is an important determinant of school readiness. School readiness, in turn, sets the stage for school success. There is clear longitudinal evidence that school success, attachment and bonding to the schooling process, and full engagement of schooling can, in combination, operate as a protective factor against a host of…

  15. Predicting ready biodegradability of premanufacture notice chemicals.

    Science.gov (United States)

    Boethling, Robert S; Lynch, David G; Thom, Gary C

    2003-04-01

    Chemical substances other than pesticides, drugs, and food additives are regulated by the U.S. Environmental Protection Agency (U.S. EPA) under the Toxic Substances Control Act (TSCA), but the United States does not require that new substances be tested automatically for such critical properties as biodegradability. The resulting lack of submitted data has fostered the development of estimation methods, and the BioWIN models for predicting biodegradability from chemical structure have played a prominent role in premanufacture notice (PMN) review. Until now, validation efforts have used only the Japanese Ministry of International Trade and Industry (MITI) test data and have not included all models. To assess BioWIN performance with PMN substances, we assembled a database of PMNs for which ready biodegradation data had been submitted over the period 1995 through 2001. The 305 PMN structures are highly varied and pose major challenges to chemical property estimation. Despite the variability of ready biodegradation tests, the use of at least six different test methods, and widely varying quality of submitted data, accuracy of four of six BioWIN models (MITI linear, MITI nonlinear, survey ultimate, survey primary) was in the 80+% range for predicting ready biodegradability. Greater accuracy (>90%) can be achieved by using model estimates only when the four models agree (true for 3/4 of the PMNs). The BioWIN linear and nonlinear probability models did not perform as well even when classification criteria were optimized. The results suggest that the MITI and survey BioWIN models are suitable for use in screening-level applications.

  16. Decentralization of operating reactor licensing reviews: NRR Pilot Program

    International Nuclear Information System (INIS)

    Hannon, J.N.

    1984-07-01

    This report, which has incorporated comments received from the Commission and ACRS, describes the program for decentralization of selected operating reactor licensing technical review activities. The 2-year pilot program will be reviewed to verify that safety is enhanced as anticipated by the incorporation of prescribed management techniques and application of resources. If the program fails to operate as designed, it will be terminated

  17. Readiness to change criminal women and men

    Directory of Open Access Journals (Sweden)

    Krzysztof Biel

    2017-12-01

    Full Text Available The readiness of offenders to social rehabilitation is a new category in our country. Meanwhile, the research conducted in many countries indicates its usefulness in the diagnosis and selection of participants of rehabilitation programmes. This entails more effective interaction with convicted persons and greater responsibility on the part of convicted people for their own social rehabilitation process. The aim of this article is to present the main assumptions and models of readiness for change and their usefulness in social rehabilitation practice and to present pilot studies of readiness for change among criminal women and men in Kraków. Application of the Polish adaptation of the CVTRQ questionnaire made it possible to determine the level of convicted persons’ readiness, taking into account deficits in particular scales of the questionnaire and variables differentiating the group of ready and not ready people. At the end, guidelines for further research will be presented.

  18. 7 CFR 3415.10 - Establishment and operation of peer review groups.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Establishment and operation of peer review groups... ASSESSMENT RESEARCH GRANTS PROGRAM Scientific Peer Review of Research Grant Applications § 3415.10 Establishment and operation of peer review groups. Subject to § 3415.5, the Administrator shall adopt procedures...

  19. 7 CFR 3400.10 - Establishment and operation of peer review groups.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Establishment and operation of peer review groups... GRANTS PROGRAM Scientific Peer Review of Research Grant Applications § 3400.10 Establishment and operation of peer review groups. Subject to § 3400.5, the Administrator will adopt procedures for the...

  20. 7 CFR 3401.12 - Establishment and operation of peer review groups.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Establishment and operation of peer review groups... GRANTS PROGRAM Scientific Peer Review of Research Applications for Funding § 3401.12 Establishment and operation of peer review groups. Subject to § 3401.7, the Administrator will adopt procedures for the...

  1. 7 CFR 3411.10 - Establishment and operation of peer review groups.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Establishment and operation of peer review groups... INITIATIVE COMPETITIVE GRANTS PROGRAM Scientific Peer Review of Research Grant Applications § 3411.10 Establishment and operation of peer review groups. Subject to § 3411.5, the Administrator shall adopt procedures...

  2. Review of operating room ventilation standards

    NARCIS (Netherlands)

    Melhado, M.D.A.; Hensen, J.L.M.; Loomans, M.G.L.C.

    2006-01-01

    This article reviews standards applied to operating room ventilation design used by European, South and North American countries. Required environmental parameters are compared with regard to type of surgery, and ventilation system. These requirements as well as their relation to infection control

  3. Zero Energy Schools: Designing for the Future: Zero Energy Ready K-12 Schools

    Energy Technology Data Exchange (ETDEWEB)

    Torcellini, Paul A [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2017-09-29

    Designing, building, and operating zero energy ready K-12 schools provides benefits for districts, students, and teachers. Optimizing energy efficiency is important in any building, but it's particularly important in K-12 schools. Many U.S. school districts struggle for funding, and improving a school building's energy efficiency can free up operational funds that may then be available for educational and other purposes.

  4. Determining transition readiness in congenital heart disease: Assessing the utility of the Transition Readiness Questionnaire

    Science.gov (United States)

    The Transition Readiness Assessment Questionnaire (TRAQ) is a tool commonly used to assess transition readiness in adolescents with chronic diseases. It was previously validated in youth with special health care needs (YSHCN), but no patients with congenital heart disease (CHD) were included in the ...

  5. IAEA Operational Safety Team Reviews Cattenom Nuclear Power Plant

    International Nuclear Information System (INIS)

    2011-01-01

    Full text: An international team of nuclear installation safety experts led by the International Atomic Energy Agency (IAEA) has reviewed operational safety at France's Cattenom Nuclear Power Plant (NPP) noting a series of good practices as well as recommendations and suggestions to reinforce them. The IAEA assembled an international team of experts at the request of the Government of France to conduct an Operational Safety Review (OSART) of Cattenom NPP. Under the leadership of the IAEA's Division of Nuclear Installation Safety in Vienna, the OSART team performed an in-depth operational safety review of the plant from 14 November to 1 December 2011. The team was made up of experts from Belgium, the Czech Republic, Finland, Germany, Hungary, Japan, Russia, Slovakia, South Africa, Sweden, Ukraine, the United Kingdom and the IAEA. The team at Cattenom conducted an in-depth review of the aspects essential to the safe operation of the NPP, which is largely under the control of the site management. The conclusions of the review are based on the IAEA's Safety Standards. The review covered the areas of Management, Organization and Administration; Training and Qualification; Operations; Maintenance; Technical Support; Operating Experience; Radiation Protection; Chemistry; Emergency Planning and Preparedness; and Severe Accident Management. Cattenom is the first plant in Europe to voluntarily undertake a Severe Accident Management review during an OSART review. The OSART team has identified good plant practices, which will be shared with the rest of the nuclear industry for consideration of their application. Examples include: Sheets are displayed in storage areas where combustible material is present - these sheets are updated readily and accurately by the area owner to ensure that the fire limits are complied with; A simple container is attached to the neutron source handling device to ensure ease and safety of operations and reduce possible radiation exposure during use

  6. MIBS breadboard ready for testing

    Science.gov (United States)

    Leijtens, Johan; de Goeij, Bryan; Boslooper, Erik

    2017-11-01

    MIBS is a spectrometer operating in the thermal infrared wavelength region, designed in frame of the phase A study for the ESA EarthCARE mission as part of the multispectral Imaging instrument MSI, which uses a 2D microbolometer array detector in stead of the more common MCT detectors. Utilization of a microbolometer and using an integrated calibration system, results in a sensor with a size and mass reduction of at least an order of magnitude when compared to currently flying instruments with similar spectral resolution. In order to demonstrate feasiblity a breadboard has been designed, which will be build and aligned in 2006 and will be ready for testing the forth quarter of 2006.

  7. Idaho National Laboratory Emergency Readiness Assurance Plan — Fiscal Year 2016

    International Nuclear Information System (INIS)

    None, None

    2016-01-01

    Battelle Energy Alliance, LLC, the prime contractor for Idaho National Laboratory (INL), provides this Emergency Readiness Assurance Plan (ERAP) for Fiscal Year 2016 in accordance with DOE O 151.1C, “Comprehensive Emergency Management System.” The ERAP documents the readiness of the INL Emergency Management Program using emergency response planning and preparedness activities as the basis. It describes emergency response planning and preparedness activities, and where applicable, summarizes and/or provides supporting information in tabular form for easy access to data. The ERAP also provides budget, personnel, and planning forecasts for Fiscal Year 2017. Specifically, the ERAP assures the Department of Energy Idaho Operations Office that stated emergency capabilities at INL are sufficient to implement PLN 114, “INL Emergency Plan/RCRA Contingency Plan.”

  8. Idaho National Laboratory Emergency Readiness Assurance Plan — Fiscal Year 2014

    Energy Technology Data Exchange (ETDEWEB)

    Bush, Shane [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-09-01

    Battelle Energy Alliance, LLC, the prime contractor for Idaho National Laboratory (INL), provides this Emergency Readiness Assurance Plan (ERAP) for Fiscal Year 2014 in accordance with DOE O 151.1C, “Comprehensive Emergency Management System.” The ERAP documents the readiness of the INL Emergency Management Program using emergency response planning and preparedness activities as the basis. It describes emergency response planning and preparedness activities, and where applicable, summarizes and/or provides supporting information in tabular form for easy access to data. The ERAP also provides budget, personnel, and planning forecasts for Fiscal Year 2015. Specifically, the ERAP assures the Department of Energy Idaho Operations Office that stated emergency capabilities at INL are sufficient to implement PLN-114, “INL Emergency Plan/RCRA Contingency Plan.”

  9. Idaho National Laboratory Emergency Readiness Assurance Plan — Fiscal Year 2016

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2016-09-13

    Battelle Energy Alliance, LLC, the prime contractor for Idaho National Laboratory (INL), provides this Emergency Readiness Assurance Plan (ERAP) for Fiscal Year 2016 in accordance with DOE O 151.1C, “Comprehensive Emergency Management System.” The ERAP documents the readiness of the INL Emergency Management Program using emergency response planning and preparedness activities as the basis. It describes emergency response planning and preparedness activities, and where applicable, summarizes and/or provides supporting information in tabular form for easy access to data. The ERAP also provides budget, personnel, and planning forecasts for Fiscal Year 2017. Specifically, the ERAP assures the Department of Energy Idaho Operations Office that stated emergency capabilities at INL are sufficient to implement PLN 114, “INL Emergency Plan/RCRA Contingency Plan.”

  10. TFA Tanks Focus Area midyear review report FY 2000

    Energy Technology Data Exchange (ETDEWEB)

    LR Roeder-Smith

    2000-05-02

    In accordance with EM's office of Science and Technology (OST), the TFA is committed to assessing the maturity of technology development projects and ensuring their readiness for implementation and subsequent deployment. The TFA conducts an annual Midyear Review to document the status of ongoing projects, reaffirm and document user commitment to selected projects, and to improve the effective deployment of technology by determining and documenting the readiness of selected projects to move ahead. Since 1995, OST has used a linear technology maturation model that spans through seven defined stages of maturity, from basic research to implementation. Application of this Stage/Gate model to technology development resulted in prescriptive and somewhat cumbersome review procedures, resulting in limited and inconsistent use. Subsequently, in February 2000, OST issued revised guidance in an effort to streamline the technology tracking and review process. While the new OST guidance reinforces peer review requirements and the use of the American Society of Mechanical Engineers (ASME) for independent reviews, it also implements a simplified Gate model. The TFA is now responsible for providing auditable documentation for passing only three stages of technology maturity: ready for research (Gate 0); ready for development (Gate 2); ready for demonstration (Gate 5). The TFA Midyear Review is a key element in the overall review procedure, as the tracking evidence for all active projects is required to be available at this time. While the Midyear Report contains an overview of the status of all TFA reviews and projects, not all the reviews were conducted during the Midyear Review. The TFA used a phased approach to accomplish the Midyear Review requirements.

  11. Starting school healthy and ready to learn: using social indicators to improve school readiness in Los Angeles County.

    Science.gov (United States)

    Wold, Cheryl; Nicholas, Will

    2007-10-01

    School readiness is an important public health outcome, determined by a set of interdependent health and developmental trajectories and influenced by a child's family, school, and community environments. The same factors that influence school readiness also influence educational success and health throughout life. A California cigarette tax ballot initiative (Proposition 10) created new resources for children aged 0 to 5 years and their families statewide through county-level First 5 commissions, including First 5 LA in Los Angeles County. An opportunity to define and promote school readiness indicators was facilitated by collaborative relationships with a strong emphasis on data among First 5 LA, the Children's Planning Council, and the Los Angeles County Public Health Department, and other child-serving organizations. A workgroup developed school readiness goals and indicators based on recommendations of the National Education Goals Panel and five key domains of child well-being: 1) good health, 2) safety and survival, 3) economic well-being, 4) social and emotional well-being, and 5) education/workforce readiness. The Los Angeles County Board of Supervisors and First 5 LA Commission adopted the school readiness indicators. First 5 LA incorporated the indicators into the results-based accountability framework for its strategic plan and developed a community-oriented report designed to educate and spur school readiness-oriented action. The Los Angeles County Board of Supervisors approved a countywide consensus-building plan designed to engage key stakeholders in the use of the indicators for planning, evaluation, and community-building activities. School readiness indicators in Los Angeles County represent an important step forward for public health practice, namely, the successful blending of an expanded role for assessment with the ecological model.

  12. The Readiness Ruler as a measure of readiness to change poly-drug use in drug abusers

    DEFF Research Database (Denmark)

    Hesse, Morten

    2006-01-01

    Readiness to change is a crucial issue in the treatment of substance use disorders. Experiences with methadone maintenance treatment (MMT) has shown that continuous drug and alcohol use with all its consequences characterize most MMT programs. In a prospective study of drug abusers seeking opiate...... agonist maintenance treatment in the City of Copenhagen, subjects were administered the Addiction Severity Index, and the Readiness Ruler for each of 11 different licit and illicit drugs by research technicians. Data was collected upon admission to the program and at a 18 month follow-up. Subjects who...... indicated they wanted to quit or cut down upon admission, reported less drug use at 18 month follow-up, after controlling for severity of drug problems at intake. Subjects who expressed readiness to change their drug use upon admission decreased their drug use. It is concluded that the Readiness Ruler...

  13. How operational issues impact science peer review

    Science.gov (United States)

    Blacker, Brett S.; Golombek, Daniel; Macchetto, Duccio

    2006-06-01

    In some eyes, the Phase I proposal selection process is the most important activity handled by the Space Telescope Science Institute (STScI). Proposing for HST and other missions consists of requesting observing time and/or archival research funding. This step is called Phase I, where the scientific merit of a proposal is considered by a community based peer-review process. Accepted proposals then proceed thru Phase II, where the observations are specified in sufficient detail to enable scheduling on the telescope. Each cycle the Hubble Space Telescope (HST) Telescope Allocation Committee (TAC) reviews proposals and awards observing time that is valued at $0.5B, when the total expenditures for HST over its lifetime are figured on an annual basis. This is in fact a very important endeavor that we continue to fine-tune and tweak. This process is open to the science community and we constantly receive comments and praise for this process. In this last year we have had to deal with the loss of the Space Telescope Imaging Spectrograph (STIS) and move from 3-gyro operations to 2-gyro operations. This paper will outline how operational issues impact the HST science peer review process. We will discuss the process that was used to recover from the loss of the STIS instrument and how we dealt with the loss of 1/3 of the current science observations. We will also discuss the issues relating to 3-gyro vs. 2-gyro operations and how that changes impacted Proposers, our in-house processing and the TAC.

  14. Post-operative telephone review is cost-effective and acceptable to patients.

    LENUS (Irish Health Repository)

    Gray, R T

    2012-02-01

    INTRODUCTION: Patients undergoing selective minor emergency and elective procedures are followed up by a nurse-led structured telephone review six weeks post-operatively in our hospital. Our study objectives were to review patients\\' satisfaction, assess cost-effectiveness and compare our practice with other surgical units in Northern Ireland (NI). PATIENTS AND METHODS: Completed telephone follow-up forms were reviewed retrospectively for a three-year period and cost savings calculated. Fifty patients were contacted prospectively by telephone using a questionnaire to assess satisfaction of this follow-up. A postal questionnaire was sent to 68 general and vascular surgeons in NI, assessing individual preferences for patient follow-up. RESULTS: A total of 1378 patients received a telephone review from September 2005 to September 2008. One thousand one hundred and seventy-seven (85.4%) were successfully contacted, while 201 (14.6%) did not respond despite multiple attempts. One hundred and forty-seven respondents (10.7%) required further outpatient follow-up, thereby saving 1231 outpatient reviews, equivalent to pound41,509 per annum. Thirty-nine (78%) patients expected post-operative follow-up, with 29 (58%) expecting this in the outpatient department. However, all patients were satisfied with the nurse-led telephone review. Fifty-three (78%) consultants responded. Those who always, or occasionally, review patients post-operatively varies according to the operation performed, ranging from 2.2% appendicectomy patients to 40.0% for varicose vein surgery. CONCLUSION: Current practice in NI varies, but a significant proportion of patients are not routinely reviewed. This study confirmed that patients expect post-operative follow-up. A nurse-led telephone review service is acceptable to patients, cost-effective and reduces the number of unnecessary outpatient reviews.

  15. Organization and Management of the International Space Station (ISS) Multilateral Medical Operations

    Science.gov (United States)

    Duncan, J. M.; Bogomolov, V. V.; Castrucci, F.; Koike, Y.; Comtois, J. M.; Sargsyan, A. E.

    2007-01-01

    The goal of this work is to review the principles, design, and function of the ISS multilateral medical authority and the medical support system of the ISS Program. Multilateral boards and panels provide operational framework, direct, and supervise the ISS joint medical operational activities. The Integrated Medical Group (IMG) provides front-line medical support of the crews. Results of ongoing activities are reviewed weekly by physician managers. A broader status review is conducted monthly to project the state of crew health and medical support for the following month. All boards, panels, and groups function effectively and without interruptions. Consensus prevails as the primary nature of decisions made by all ISS medical groups, including the ISS medical certification board. The sustained efforts of all partners have resulted in favorable medical outcomes of the initial fourteen long-duration expeditions. The medical support system appears to be mature and ready for further expansion of the roles of all Partners, and for the anticipated increase in the size of ISS crews.

  16. Cultural Responsive Teaching Readiness Scale Validity and Reliability Study

    Directory of Open Access Journals (Sweden)

    Kasım KARATAŞ

    2017-12-01

    Full Text Available The aim of this research is to develop a measurement instrument that will determine the cultural responsive teaching readiness level of teacher candidates. The study group consisted of a total of 231 candidate teachers, of which 83 were males and 148 were females, who were attending their final year of class teacher education programs at various Turkish universities during the 2016-2017 education year. In the first phase, a 33-item draft form was presented to experts to be reviewed. Based on the feedback received, revisions were made and the final scale was applied to a group of 231 candidate teachers. In the analysis of the data obtained as the result of the application, Exploratory Factor Analysis (EFA was performed. The EFA produced 21 items within a two-factor structure as, “Personal Readiness” and “Professional Readiness.” It was observed that the sub-factors were components of the “cultural responsive teaching readiness” dimension, and that the goodness of fit measures obtained as a result of the First and Second Level Confirmatory Factor Analyzes (CFA were high. In addition, reliability coefficients were found to be high as a result of reliability measurements. With the help of these findings, this study concludes that the Cultural Responsive Teaching Readiness scale is both valid and reliable.

  17. Bioprinting: an assessment based on manufacturing readiness levels.

    Science.gov (United States)

    Wu, Changsheng; Wang, Ben; Zhang, Chuck; Wysk, Richard A; Chen, Yi-Wen

    2017-05-01

    Over the last decade, bioprinting has emerged as a promising technology in the fields of tissue engineering and regenerative medicine. With recent advances in additive manufacturing, bioprinting is poised to provide patient-specific therapies and new approaches for tissue and organ studies, drug discoveries and even food manufacturing. Manufacturing Readiness Level (MRL) is a method that has been applied to assess manufacturing maturity and to identify risks and gaps in technology-manufacturing transitions. Technology Readiness Level (TRL) is used to evaluate the maturity of a technology. This paper reviews recent advances in bioprinting following the MRL scheme and addresses corresponding MRL levels of engineering challenges and gaps associated with the translation of bioprinting from lab-bench experiments to ultimate full-scale manufacturing of tissues and organs. According to our step-by-step TRL and MRL assessment, after years of rigorous investigation by the biotechnology community, bioprinting is on the cusp of entering the translational phase where laboratory research practices can be scaled up into manufacturing products specifically designed for individual patients.

  18. Readiness evaluation report -- High-exposure rate hardware removal resumption of activities

    International Nuclear Information System (INIS)

    Volkman, C.L.

    1996-11-01

    In August 1996, N Basin Project Management proactively ceased activities in the N Basin after noting several radiological control anomalies occurring during the performance of the high exposure rate hardware removal activity. The HERH is one of several activities that will be accomplished to complete deactivation of N Basin. Three project critiques were performed to identify causes and several corrective actions were identified. To ensure the true causes of the events were identified the N Basin Project Manager requested that a root cause analysis be performed for the events covered by the three critiques. The intent was to identify recurring events and evaluate the effectiveness of corrective action implementation. These three review elements were used by the project to develop a corrective action plan (CAP) which consisted of both project unique and programmatic items. The N Basin Project is using this BHI Readiness Evaluation (RE) process as a mechanism to independently verify that corrective actions identified from the CAP have been completed and that no changes have been made during the stand down that affect the resumption of the HERH activities. A readiness evaluation (RE) plan (Attachment 3) was prepared. The completed Readiness Evaluation Records which documents the results of the team member evaluations are in attachment 1. The independent readiness evaluation team identified 5 deficiencies of which two are post startup and three are pre startup. All deficiencies are in the area of training. These findings are explained in detail in Attachment 2

  19. Lean Six Sigma for reduced cycle costs and improved readiness

    OpenAIRE

    Apte, Uday; Kang, Keebom

    2006-01-01

    Sponsored Report (for Acquisition Research Program) In general, during the lifecycle of a weapon system a significantly larger amount of money gets spent in operating and maintaining the system than acquiring it. Hence, efficient logistics systems, including transportation, inventory management, modifications and maintenance activities, are critically important for containing the lifecycle costs of weapon systems and for maintaining the highest level of military readiness given the extant ...

  20. Pathways to School Readiness: Executive Functioning Predicts Academic and Social-Emotional Aspects of School Readiness

    Science.gov (United States)

    Mann, Trisha D.; Hund, Alycia M.; Hesson-McInnis, Matthew S.; Roman, Zachary J.

    2017-01-01

    The current study specified the extent to which hot and cool aspects of executive functioning predicted academic and social-emotional indicators of school readiness. It was unique in focusing on positive aspects of social-emotional readiness, rather than problem behaviors. One hundred four 3-5-year-old children completed tasks measuring executive…

  1. The work of the Operational Safety Review Team (OSART)

    International Nuclear Information System (INIS)

    Hide, K.W.

    1996-01-01

    The Operational Safety Review Team (OSART) programme was set up by the IAEA in 1982 to assist Member States to enhance the operational safety of nuclear power plants. Each team is staffed by senior experts in the relevant fields. The review team discusses with plant staff the existing operational programmes for plant which may be under construction, being commissioned or already operating. Following a detailed examination of a safety programme, the OSART team lists strengths and weaknesses and makes recommendations on how to overcome the latter. Since their conclusions are based on the best prevailing international practice, they may be more stringent than those based on national criteria. The results of the 77 missions conducted at 62 plants in 28 countries by the end of 1994 are summarised. (UK)

  2. Maintenance Action Readiness Assessment Plan for Waste Area Grouping 1 inactive Tanks 3001-B, 3004-B, T-30, and 3013 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1995-07-01

    This Readiness Assessment Plan has been prepared to document operational readiness for the maintenance action consisting of remediation of four inactive liquid low-level radioactive tanks in Waste Area Grouping 1 at Oak Ridge National Laboratory. The four tanks to be remediated are Tanks 3001-B, 3004-B, T-30, and 3013. Tanks 3001-B, 3004-B, and T-30 will be removed from the ground. Because of logistical issues associated with excavation and site access, Tank 3013 will be grouted in place and permanently closed. This project is being performed as a maintenance action rather than an action under the Comprehensive Environmental Response, Compensation, and Liability Act, because the risk to human health and environment is well below the US Environmental Protection Agency's level of concern. The decision to proceed as a maintenance action was documented by an interim action proposed plan, which is included in the administrative record. A Readiness Assessment Team has been assembled to review the criteria deemed necessary to conduct the remediation tasks. These criteria include approval of all plans, acquisition of needed equipment, completion of personnel training, and coordination with plant health and safety personnel. Once the criteria have been met and documented, the task will begin. The readiness assessment is expected to be completed by late July 1995, and the task will begin thereafter

  3. DOE final report phase one startup, Waste Receiving and Processing Facility (WRAP)

    International Nuclear Information System (INIS)

    Jasen, W.G.

    1998-01-01

    This document is to validate that the WRAP facility is physically ready to start up phase 1, and that the managers and operators are prepared to safely manage and operate the facility when all pre-start findings have been satisfactorily corrected. The DOE Readiness Assessment (RA) team spent a week on-site at Waste Receiving and Processing Module 1 (WRAP-1) to validate the readiness for phase 1 start up of facility. The Contractor and DOE staff were exceptionally cooperative and contributed significantly to the overall success of the RA. The procedures and Conduct of Operations areas had significant discrepancies, many of which should have been found by the contractor review team. In addition the findings of the contractor review team should have led the WRAP-1 management team to correcting the root causes of the findings prior to the DOE RA team review. The findings and observations include many issues that the team believes should have been found by the contractor review and corrective actions taken. A significantly improved Operational Readiness Review (ORR) process and corrective actions of root causes must be fully implemented by the contractor prior to the performance of the contractor ORR for phase 2 operations. The pre-start findings as a result of this independent DOE Readiness Assessment are presented

  4. First Responder Readiness: A Systems Approach to Readiness Assessment Using Model Based Vulnerability Analysis Techniques

    Science.gov (United States)

    2005-09-01

    to come—if it be not to come, it will be now—if it be not now, yet it will come—the readiness is all. . .” --- Shakespeare , Hamlet , 5.2.215-219...BLANK 1 I. READINESS OVERVIEW A. INTRODUCTION “ Hamlet : . . . There is a special providence in the fall of a sparrow. If it be now ‘tis not

  5. SALTO Peer Review Guidelines. Guidelines for Peer Review of Safety Aspects of Long Term Operation of Nuclear Power Plants

    International Nuclear Information System (INIS)

    2014-01-01

    International peer review is a useful tool for Member States to exchange experiences, learn from each other and apply good practices in the long term operation (LTO) of nuclear power plants (NPPs). The peer review is also an important mechanism through which the IAEA supports Member States in enhancing the safety of NPPs. The IAEA has conducted various types of safety review that indirectly address aspects of LTO, including safety reviews for design, engineering, operation and external hazards. Operational Safety Review Team (OSART) services include review of ageing management programmes. In addition, several Member States have requested Ageing Management Assessment Team (AMAT) missions. Through these experiences, it was recognized that a comprehensive peer review on LTO would be very useful to Member States. The Safety Aspects of Long Term Operation (SALTO) peer review addresses strategy and key elements for the safe LTO of NPPs, which includes AMAT objectives and complements OSART reviews. The SALTO peer review is designed to assist operating organizations in adopting a proper approach to LTP including implementing appropriate activities to ensure that plant safety will be maintained during the LTO period. The SALTO peer review can be tailored to focus on ageing management programmes (AMPs) or on other activities related to LTO to support the Member State in enhancing the safety of its NPPs. The SALTO peer review can also support regulators in establishing or improving regulatory and licensing strategies for the LTO of NPPs. The guidelines in this publication are primarily intended for members of a SALTO review team and provide a basic structure and common reference for peer reviews of LTO. Additionally, the guidelines also provide useful information to the operating organizations of NPPs (or technical support organizations) for carrying out their own self-assessments or comprehensive programme reviews. The guidelines are intended to be generic, as there are

  6. Experimental methods to validate measures of emotional state and readiness for duty in critical operations

    International Nuclear Information System (INIS)

    Weston, Louise Marie

    2007-01-01

    A recent report on criticality accidents in nuclear facilities indicates that human error played a major role in a significant number of incidents with serious consequences and that some of these human errors may be related to the emotional state of the individual. A pre-shift test to detect a deleterious emotional state could reduce the occurrence of such errors in critical operations. The effectiveness of pre-shift testing is a challenge because of the need to gather predictive data in a relatively short test period and the potential occurrence of learning effects due to a requirement for frequent testing. This report reviews the different types of reliability and validity methods and testing and statistical analysis procedures to validate measures of emotional state. The ultimate value of a validation study depends upon the percentage of human errors in critical operations that are due to the emotional state of the individual. A review of the literature to identify the most promising predictors of emotional state for this application is highly recommended

  7. Operating experience review for the AP1000 plant

    International Nuclear Information System (INIS)

    Chaney, T. E.; Lipner, M. H.

    2006-01-01

    Westinghouse is performing an update to the Operating Experience Review (OER) Report for the AP1000 project to account for operating experience since December 1996. Significant Operating Experience Reports, Significant Event Reports, Significant Event Notifications, Operations and Maintenance Reminders, Topical Reports, Event Analysis Reports and Licensee Event Reports were researched for pertinent input to the update. As a part of the OER, Westinghouse has also conducted operator interviews and observations during simulated plant operations and after operating events. The main purpose of the OER is to identify Human Factors Engineering (HFE) related safety issues from existing operating plant experience and to ensure that these issues are addressed in the new design. The issues and lessons learned regarding operating experience provide a basis for improving the plant design. (authors)

  8. 42 CFR 52h.3 - Establishment and operation of peer review groups.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Establishment and operation of peer review groups... GRANTS SCIENTIFIC PEER REVIEW OF RESEARCH GRANT APPLICATIONS AND RESEARCH AND DEVELOPMENT CONTRACT PROJECTS § 52h.3 Establishment and operation of peer review groups. (a) To the extent applicable, the...

  9. Waste Receiving and Processing (WRAP) Facility Public Address System Review Findings

    International Nuclear Information System (INIS)

    HUMPHRYS, K.L.

    1999-01-01

    Public address system operation at the Waste Receiving and Processing (WRAP) facility was reviewed. The review was based on an Operational Readiness Review finding that public address performance was not adequate in parts of the WRAP facility. Several improvements were made to the WRAP Public Address (PA) system to correct the deficiencies noted. Speaker gain and position was optimized. A speech processor was installed to boost intelligibility in high noise areas. Additional speakers were added to improve coverage in the work areas. The results of this evaluation indicate that further PA system enhancements are not warranted. Additional speakers cannot compensate for the high background sound and high reverberation levels found in the work areas. Recommendations to improve PA system intelligibility include minor speaker adjustments, enhanced PA announcement techniques, and the use of sound reduction and abatement techniques where economically feasible

  10. Evaluation of microbial contamination of ready-to-eat foods (pizza, frankfurters, sausages in the city of Ilam

    Directory of Open Access Journals (Sweden)

    Akbar Eslami

    2017-05-01

    Full Text Available Background: Today in the world, disease resulting from food is considered one of the most important problems in public health. This study aimed to determine the bacterial contamination of ready-to-eat foods, i.e. fast food, in Ilam city. Methods: In this cross-sectional, analytical study, 270 samples of ready-to-eat food, including pizza, frankfurters, and sausages, were randomly collected and tested for contamination with Staphylococcus aureus, Escherichia coli, Shigella sonnei, Salmonella arizonae, and Enterococcus faecalis. After examination, the collected data was analyzed using SPSS 20 software and logistic regression. Results: From a total of 270 samples of ready-to-eat food, 27.77% was contaminated with E. coli, 21.48% with S. aureus, 13.33% with S. sonnei, 14.44% with S. arizonae, and 5.9% with E. faecalis. The results showed higher rates of E. coli and S. aureus contamination in pizza, frankfurters, and sausages. Also, a higher percentage of frankfurters were contaminated with microbial species than pizza or sausages. There were significant differences in microbial contamination rates (P < 0.05 among the three groups of food. In addition, factors such as indicators (health, sanitation, and lack of hygiene, age, gender, and education level of the operating staff had no effect on the results. Conclusion: Based on the results, it can be concluded that bacterial contamination of ready-to-eat foods is significantly high in the city of Ilam; therefore, it is suggested that the examination of food in various stages of production and distribution can help reduce bacterial contamination, and training for the operators of shopping centers’ ready-to-eat food shops and controlling pathogens are essential.

  11. Evaluation of microbial contamination of ready-to-eat foods (pizza, frankfurters, sausages in the city of Ilam

    Directory of Open Access Journals (Sweden)

    Akbar Eslami

    2017-03-01

    Full Text Available Background: Today in the world, disease resulting from food is considered one of the most important problems in public health. This study aimed to determine the bacterial contamination of ready-to-eat foods, i.e. fast food, in Ilam city. Methods: In this cross-sectional, analytical study, 270 samples of ready-to-eat food, including pizza, frankfurters, and sausages, were randomly collected and tested for contamination with Staphylococcus aureus, Escherichia coli, Shigella sonnei, Salmonella arizonae, and Enterococcus faecalis. After examination, the collected data was analyzed using SPSS 20 software and logistic regression. Results: From a total of 270 samples of ready-to-eat food, 27.77% was contaminated with E. coli, 21.48% with S. aureus, 13.33% with S. sonnei, 14.44% with S. arizonae, and 5.9% with E. faecalis. The results showed higher rates of E. coli and S. aureus contamination in pizza, frankfurters, and sausages. Also, a higher percentage of frankfurters were contaminated with microbial species than pizza or sausages. There were significant differences in microbial contamination rates (P < 0.05 among the three groups of food. In addition, factors such as indicators (health, sanitation, and lack of hygiene, age, gender, and education level of the operating staff had no effect on the results. Conclusion: Based on the results, it can be concluded that bacterial contamination of ready-to-eat foods is significantly high in the city of Ilam; therefore, it is suggested that the examination of food in various stages of production and distribution can help reduce bacterial contamination, and training for the operators of shopping centers’ ready-to-eat food shops and controlling pathogens are essential.

  12. 1987 DOE review: First collider run operation

    International Nuclear Information System (INIS)

    Childress, S.; Crawford, J.; Dugan, G.

    1987-05-01

    This review covers the operations of the first run of the 1.8 TeV superconducting super collider. The papers enclosed cover: PBAR source status, fixed target operation, Tevatron cryogenic reliability and capacity upgrade, Tevatron Energy upgrade progress and plans, status of the D0 low beta insertion, 1.8 K and 4.7 K refrigeration for low-β quadrupoles, progress and plans for the LINAC and booster, near term and long term and long term performance improvements

  13. Whole dietary patterns to optimize cognitive function for military mission-readiness: a systematic review and recommendations for the field.

    Science.gov (United States)

    Teo, Lynn; Crawford, Cindy; Yehuda, Rachel; Jaghab, Danny; Bingham, John J; Gallon, Matthew D; O'Connell, Meghan L; Chittum, Holly K; Arzola, Sonya M; Berry, Kevin

    2017-06-01

    Optimizing cognitive performance, particularly during times of high stress, is a prerequisite to mission-readiness among military personnel. It has been of interest to determine whether such performance could be enhanced through diet. This systematic review assesses the quality of the evidence for whole dietary patterns across various outcomes related to cognitive function in healthy adult populations to develop research recommendations for the military. PubMed, CINAHL, Embase, PsycInfo, and the Cochrane Library were searched. Peer-reviewed randomized controlled trials published in the English language were eligible. Fifteen included trials were assessed for methodological quality, and descriptive data were extracted. Of the 6 acceptable-quality studies, 1 demonstrated statistically nonsignificant results, whereas the other 5 showed conflicting results across the cognitive outcomes assessed. Due to the heterogeneity across the included studies, no recommendations could be reached concerning whether certain whole dietary patterns have an effect on cognitive outcomes in healthy populations. Specific recommendations for future research are offered. © The Author(s) 2017. Published by Oxford University Press on behalf of the International Life Sciences Institute. All rights reserved. For Permissions, please e-mail: journals.permissions@oup.com.

  14. The FORGE AHEAD clinical readiness consultation tool: a validated tool to assess clinical readiness for chronic disease care mobilization in Canada's First Nations.

    Science.gov (United States)

    Hayward, Mariam Naqshbandi; Mequanint, Selam; Paquette-Warren, Jann; Bailie, Ross; Chirila, Alexandra; Dyck, Roland; Green, Michael; Hanley, Anthony; Tompkins, Jordan; Harris, Stewart

    2017-03-23

    Given the astounding rates of diabetes and related complications, and the barriers to providing care present in Indigenous communities in Canada, intervention strategies that take into account contextual factors such as readiness to mobilize are needed to maximize improvements and increase the likelihood of success and sustainment. As part of the national FORGE AHEAD Program, we sought to develop, test and validate a clinical readiness consultation tool aimed at assessing the readiness of clinical teams working on-reserve in First Nations communities to participate in quality improvement (QI) to enhance diabetes care in Canada. A literature review was conducted to identify existing readiness tools. The ABCD - SAT was adapted using a consensus approach that emphasized a community-based participatory approach and prioritized the knowledge and wisdom held by community members. The tool was piloted with a group of 16 people from 7 provinces and 11 partnering communities to assess language use, clarity, relevance, format, and ease of completion using examples. Internal reliability analysis and convergence validity were conducted with data from 53 clinical team members from 11 First Nations communities (3-5 per community) who have participated in the FORGE AHEAD program. The 27-page Clinical Readiness Consultation Tool (CRCT) consists of five main components, 21 sub-components, and 74 items that are aligned with the Expanded Chronic Care Model. Five-point Likert scale feedback from the pilot ranged from 3.25 to 4.5. Length of the tool was reported as a drawback but respondents noted that all the items were needed to provide a comprehensive picture of the healthcare system. Results for internal consistency showed that all sub-components except for two were within acceptable ranges (0.77-0.93). The Team Structure and Function sub-component scale had a moderately significant positive correlation with the validated Team Climate Inventory, r = 0.45, p < 0.05. The

  15. Operational safety review programmes for nuclear power plants. Guidelines for assessment

    International Nuclear Information System (INIS)

    2002-01-01

    The IAEA has been offering the Operational Safety Review Team (OSART) programme to provide advice and assistance to Member States in enhancing the operational safety of nuclear power plants (NPPs). Simultaneously, the IAEA has encouraged self-assessment and review by Member States of their own nuclear power plants to continuously improve nuclear safety. Currently, some utilities have been implementing safety review programmes to independently review their own plants. Corporate or national operational safety review programmes may be compliance or performance based. Successful utilities have found that both techniques are necessary to provide assurance that (i) as a minimum the NPP meets specific corporate and legal requirements and (ii) management at the NPP is encouraged to pursue continuous improvement principles. These programmes can bring nuclear safety benefits to the plants and utilities. The IAEA has conducted two pilot missions to assess the effectiveness of the operational review programme. Based on these missions and on the experience gained during OSART missions, this document has been developed to provide guidance on and broaden national/corporate safety review programmes in Member States, and to assist in maximizing their benefits. These guidelines are intended primarily for the IAEA team to conduct assessment of a national/corporate safety review programme. However, this report may also be used by a country or utility to establish its own national/corporate safety review programme. The guidelines may likewise be used for self-assessment or for establishing a baseline when benchmarking other safety review programmes. This report consists of four parts. Section 2 addresses the planning and preparation of an IAEA assessment mission and Sections 3 and 4 deal with specific guidelines for conducting the assessment mission itself

  16. Phytochemicals to optimize cognitive function for military mission-readiness: a systematic review and recommendations for the field.

    Science.gov (United States)

    Teo, Lynn; Crawford, Cindy; Snow, James; Deuster, Patricia A; Bingham, John J; Gallon, Matthew D; O'Connell, Meghan L; Chittum, Holly K; Arzola, Sonya M; Berry, Kevin

    2017-06-01

    Optimizing cognitive performance and preventing cognitive impairments that result from exposure to high-stress situations are important to ensure mission-readiness for military personnel. This systematic review assesses the quality of the evidence for plant-based foods and beverages, or their phytochemical constituents, across various outcomes related to cognitive function in healthy adult populations to develop research recommendations for the military. PubMed, CINAHL, Embase, PsycInfo, and the Cochrane Library were searched. Peer-reviewed randomized controlled trials published in the English language were eligible. Twenty-five trials were included and assessed for methodological quality, and descriptive data were extracted. The acceptable (n = 16) to high-quality (n = 4) studies produced either no statistically significant effect or mixed results for enhancing cognitive function. The evidence suggested that healthy populations do not experience significant changes in cognitive performance when consuming soy- and non-soy-sourced isoflavones or cocoa. Heterogeneity among other interventions precluded reaching formal conclusions surrounding the evidence. Research recommendations are offered, including conducting more studies on the effect of plant-based interventions on populations reflective of military populations when exposed to military-like situations. © The Author(s) 2017. Published by Oxford University Press on behalf of the International Life Sciences Institute. All rights reserved. For Permissions, please e-mail: journals.permissions@oup.com.

  17. Operations and Maintenance Cost for Stratified Buildings: A Critical Review

    Directory of Open Access Journals (Sweden)

    Che-Ghani Nor Zaimah

    2016-01-01

    Full Text Available Building maintenance is essential in preserving buildings’ appearance and performance. It needs to upkeep the building performance to prolong its value and building life cycle. Malaysia is still lacking in managing cost for building operation and maintenance. It has been found that the cost for housing maintenance is high due to poor maintenance practices. In order to get better understanding on how to manage the cost, this study reviews the contributing factors that affecting operation and maintenance cost of stratified buildings in Malaysia. The research first identified the factors through extensive literature review and scrutinize on factors that affecting and can minimize operation and maintenance cost. This literature review offers insight into building maintenance scenario in Malaysia focusing on the issues and challenges. The study also finds that operation and maintenance cost for housing in Malaysia is still in poor state. Interestingly, this paper revealed that operation and maintenance cost is also influenced by three significant factors like expectation of tenants, building characteristics and building defects. Measures to reduce the housing operation and maintenance cost are also highlighted so that this study can be a stepping stone towards proposing efficient and effective facilities management strategies for affordable housing in future.

  18. EDUCATIONAL INNOVATIONS: AXIOLOGICAL BASES OF MEGALOPOLIS YOUTH’S READINESS

    Directory of Open Access Journals (Sweden)

    Olga V. Kruzhkova

    2015-01-01

    Full Text Available The purpose of the present article is to examine the value bases of the readiness for innovations in the modern education of the youth of the megalopolises.Methods. As the methods were used: theoretical analysis and modeling method, as well as a survey of students of megalopolises (n = 1187 by the valuable questionnaire of S. Schwartz.Results. The authors give the description of educational innovations from the perspective of the overall needs of society in an individual which has technological skills and targets in acquiring and operating information. The reorientation of education on advancing development is implemented through numerous tactical and strategic changes in its form, content, methods and structure of the educational system in general. These changes can be united into five groups. Organizational innovations are pointed at changing the structure of education in accordance with the dynamic characteristics of society. Informative innovations suggest differentiation of activities and the level of responsibility of professionals in the same profile. The activity innovations are focused on changing the teachers’ readiness to transform their professional work and the development of their innovative competence. Productive innovations solve the problem of personality development of a professional in accordance with the social mandate. Socio-control innovations are designed to achieve transparency of management education for society. Implementation of the considered innovations is provided by numerous factors, which includes readiness of students to participate in the latest developments of the educational environment. The basis of this readiness contains value orientations, actualizing expectations and targets of young people as participants of innovations. Value priorities of megalopolis youth are highlighted: independence of thoughts and actions, hedonism, reputation and goodwill. On the one hand, these values provide a high readiness

  19. National culture and operations management : a structured literature review

    NARCIS (Netherlands)

    Boscari, Stefania; Bortolotti, Thomas; Netland, Torbjorn; Rich, Nicholas

    2018-01-01

    National culture has received a substantial amount of interest in the operations management literature. We present the first structured review of articles studying national culture in operations management. Our search returned 51 papers published in ten leading journals between 2000 and 2017. We

  20. Beyond College Eligibility: A New Framework for Promoting College Readiness. College Readiness Indicator Systems Resource Series

    Science.gov (United States)

    Annenberg Institute for School Reform at Brown University, 2014

    2014-01-01

    The College Readiness Indicator Systems (CRIS) initiative was developed in response to a troubling pattern: More students than ever are enrolling in college after high school, but many of them are not college ready, as evidenced by persistently low rates of college completion. The sense of urgency to close the gap between college eligibility and…

  1. Organisational readiness for introducing a performance management system

    Directory of Open Access Journals (Sweden)

    Michael Ochurub

    2012-09-01

    Full Text Available Orientation: The successful introduction of performance management systems to the public service requires careful measurement of readiness for change.Research purpose: This study investigated the extent to which employees were ready for change as an indication of whether their organisation was ready to introduce a performance management system (PMS.Motivation for the study: Introducing system changes in organisations depends on positive employee preconditions. There is some debate over whether organisations can facilitate these preconditions. This research investigates change readiness linked to the introduction of a PMS in a public sector organisation. The results add to the growing literature on levels of change readiness.Research design, approach and method: The researchers used a quantitative, questionnairebased design. Because the organisation was large, the researchers used stratified sampling to select a sample from each population stratum. The sample size was 460, which constituted 26% of the total population. They used a South African change readiness questionnaire to elicit employee perceptions and opinions.Main findings: The researchers found that the organisation was not ready to introduce a PMS. The study identified various challenges and key factors that were negatively affecting the introduction of a PMS.Practical/managerial implications: The intention to develop and introduce performance management systems is generally to change the attitudes, values and approaches of managers and employees to the new strategies, processes and plans to improve productivity and performance. However, pre-existing conditions and attitudes could have an effect. It is essential to ensure that organisations are ready to introduce performance management systems and to provide sound change leadership to drive the process effectively. This study contributes to the body of knowledge about the challenges and factors organisations should consider when they

  2. Columbia River System Operation Review final environmental impact statement. Appendix A: River Operation Simulation (ROSE)

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. The River Operation Simulation Experts (ROSE) work group is comprised of representatives of the Corps, BPA, Reclamation, NMFS, Pacific Northwest Utilities Conference Committee (PNUCC), and Northwest Power Planning Council (NPPC). ROSE was responsible for using computer hydroregulation models to simulate the operation of the river system for all of the alternatives evaluated in screening and full scale analysis in SOR. These models are complex computer programs which sequentially route streamflows through each dam in the system, calculating the streamflows, reservoir elevations, spill, power generation and other information at each project and pertinent locations on the river system. ROSE first reviewed specifications of proposed alternatives to determine whether such alternatives were formulated adequately to be run on hydroregulation models

  3. Post-event reviews: Using a quantitative approach for analysing incident response to demonstrate the value of business continuity programmes and increase planning efficiency.

    Science.gov (United States)

    Vaidyanathan, Karthik

    2017-01-01

    Business continuity management is often thought of as a proactive planning process for minimising impact from large-scale incidents and disasters. While this is true, and it is critical to plan for the worst, consistently validating plan effectiveness against smaller disruptions can enable an organisation to gain key insights about its business continuity readiness, drive programme improvements, reduce costs and provide an opportunity to quantitatively demonstrate the value of the programme to management. This paper describes a post mortem framework which is used as a continuous improvement mechanism for tracking, reviewing and learning from real-world events at Microsoft Customer Service & Support. This approach was developed and adopted because conducting regular business continuity exercises proved difficult and expensive in a complex and distributed operations environment with high availability requirements. Using a quantitative approach to measure response to incidents, and categorising outcomes based on such responses, enables business continuity teams to provide data-driven insights to leadership, change perceptions of incident root cause, and instil a higher level of confidence towards disaster response readiness and incident management. The scope of the framework discussed here is specific to reviewing and driving improvements from operational incidents. However, the concept can be extended to learning and evolving readiness plans for other types of incidents.

  4. A Multidimensional Model for Child Maltreatment Prevention Readiness in Low- and Middle-Income Countries

    Science.gov (United States)

    Mikton, Christopher; Mehra, Radhika; Butchart, Alexander; Addiss, David; Almuneef, Maha; Cardia, Nancy; Cheah, Irene; Chen, JingQi; Makoae, Mokhantso; Raleva, Marija

    2011-01-01

    The study's aim was to develop a multidimensional model for the assessment of child maltreatment prevention readiness in low- and middle-income countries. The model was developed based on a conceptual review of relevant existing models and approaches, an international expert consultation, and focus groups in six countries. The final model…

  5. Development and Pilot Test of the Workplace Readiness Questionnaire, a Theory-Based Instrument to Measure Small Workplaces' Readiness to Implement Wellness Programs.

    Science.gov (United States)

    Hannon, Peggy A; Helfrich, Christian D; Chan, K Gary; Allen, Claire L; Hammerback, Kristen; Kohn, Marlana J; Parrish, Amanda T; Weiner, Bryan J; Harris, Jeffrey R

    2017-01-01

    To develop a theory-based questionnaire to assess readiness for change in small workplaces adopting wellness programs. In developing our scale, we first tested items via "think-aloud" interviews. We tested the revised items in a cross-sectional quantitative telephone survey. The study setting comprised small workplaces (20-250 employees) in low-wage industries. Decision-makers representing small workplaces in King County, Washington (think-aloud interviews, n = 9), and the United States (telephone survey, n = 201) served as study subjects. We generated items for each construct in Weiner's theory of organizational readiness for change. We also measured workplace characteristics and current implementation of workplace wellness programs. We assessed reliability by coefficient alpha for each of the readiness questionnaire subscales. We tested the association of all subscales with employers' current implementation of wellness policies, programs, and communications, and conducted a path analysis to test the associations in the theory of organizational readiness to change. Each of the readiness subscales exhibited acceptable internal reliability (coefficient alpha range, .75-.88) and was positively associated with wellness program implementation ( p < .05). The path analysis was consistent with the theory of organizational readiness to change, except change efficacy did not predict change-related effort. We developed a new questionnaire to assess small workplaces' readiness to adopt and implement evidence-based wellness programs. Our findings also provide empirical validation of Weiner's theory of readiness for change.

  6. Delphi's DETOXSM process: Preparing to treat high organic content hazardous and mixed wastes

    International Nuclear Information System (INIS)

    Robertson, D.T.; Rogers, T.W.; Goldblatt, S.D.

    1998-01-01

    The US Department of Energy (DOE) Federal Energy Technology Center is sponsoring a full-scale technology demonstration of Delphi Research, Inc.'s patented DETOX SM catalytic wet chemical oxidation waste treatment process at the Savannah River Site (SRS) in South Carolina. The process is being developed primarily to treat hazardous and mixed wastes within the DOE complex as an alternative to incineration, but it has significant potential to treat wastes in the commercial sector. The results of the demonstration will be intensively studied and used to validate the technology. A critical objective in preparing for the demonstration was the successful completion of a programmatic Operational Readiness Review. Readiness Reviews are required by DOE for all new process startups. The Readiness Review provided the vehicle to ensure that Delphi was ready to start up and operate the DETOX SM process in the safest manner possible by implementing industry accepted management practices for safe operation. This paper provides an overview of the DETOX SM demonstration at SRS, and describes the crucial areas of the Readiness Review that marked the first steps in Delphi's transition from a technology developer to an operating waste treatment services provider

  7. Readiness of ethics review systems for a changing public health landscape in the WHO African Region.

    Science.gov (United States)

    Motari, Marion; Ota, Martin Okechukwu; Kirigia, Joses Muthuri

    2015-12-02

    The increasing emphasis on research, development and innovation for health in providing solutions to the high burden of diseases in the African Region has warranted a proliferation of studies including clinical trials. This changing public health landscape requires that countries develop adequate ethics review capacities to protect and minimize risks to study participants. Therefore, this study assessed the readiness of national ethics committees to respond to challenges posed by a globalized biomedical research system which is constantly challenged by new public health threats, rapid scientific and technological advancements affecting biomedical research and development, delivery and manufacture of vaccines and therapies, and health technology transfer. This is a descriptive study, which used a questionnaire structured to elicit information on the existence of relevant national legal frameworks, mechanisms for ethical review; as well as capacity requirements for national ethics committees. The questionnaire was available in English and French and was sent to 41 of the then 46 Member States of the WHO African Region, excluding the five Lusophone Member States. Information was gathered from senior officials in ministries of health, who by virtue of their offices were considered to have expert knowledge of research ethics review systems in their respective countries. Thirty three of the 41 countries (80.5 %) responded. Thirty (90.9 %) of respondent countries had a national ethics review committee (NEC); 79 % of which were established by law. Twenty-five (83.3 %) NECs had secretarial and administrative support. Over 50 % of countries with NECs indicated a need for capacity strengthening through periodic training on international guidelines for health research (including clinical trials) ethics; and allocation of funds for administrative and secretariat support. Despite the existing training initiatives, the Region still experiences a shortage of professionals

  8. Characterization of Emissions from Open Burning of Meals Ready-to-Eat and their Paperboard Packaging

    Science.gov (United States)

    Emissions from burning current and candidate Meals Ready-to-Eat (MRE) packaging and shipping containers were characterized in an effort to assuage concerns that combustive disposal of waste at forward operating bases could pose an environmental or inhalation threat. Four types of...

  9. Life Cycle Cost Analysis of Ready Mix Concrete Plant

    Science.gov (United States)

    Topkar, V. M.; Duggar, A. R.; Kumar, A.; Bonde, P. P.; Girwalkar, R. S.; Gade, S. B.

    2013-11-01

    India, being a developing nation is experiencing major growth in its infrastructural sector. Concrete is the major component in construction. The requirement of good quality of concrete in large quantities can be fulfilled by ready mix concrete batching and mixing plants. The paper presents a technique of applying the value engineering tool life cycle cost analysis to a ready mix concrete plant. This will help an investor or an organization to take investment decisions regarding a ready mix concrete facility. No economic alternatives are compared in this study. A cost breakdown structure is prepared for the ready mix concrete plant. A market survey has been conducted to collect realistic costs for the ready mix concrete facility. The study establishes the cash flow for the ready mix concrete facility helpful in investment and capital generation related decisions. Transit mixers form an important component of the facility and are included in the calculations. A fleet size for transit mixers has been assumed for this purpose. The life cycle cost has been calculated for the system of the ready mix concrete plant and transit mixers.

  10. Peer Reviews: a voluntary means of enhancing operating culture

    International Nuclear Information System (INIS)

    Vella, R.

    1996-01-01

    In the nuclear energy industry, and also in other fields, excellent experience has been gained from the regular accumulation of expert evidence of power station operation through external organizations or teams. In 1991, the World Association of Nuclear Operations (WANO) initiated a pilot programme for voluntary 'Peer Reviews'. The success of this first exercise in gathering expert evidence led to the introduction of the 'Peer Review' programme in 1993 as one of the standard programmes of WANO. The object was to increase the safety and reliability of nuclear power stations throughout the world. WANO Peer Reviews are voluntary and are carried out at the request of a member. They are oriented towards special WANO performance objectives and criteria, which have been established by the management of WANO. (orig.) [de

  11. Understanding Early Educators' Readiness to Change

    Science.gov (United States)

    Peterson, Shira M.

    2012-01-01

    Researchers in the fields of humanistic psychology, counseling, organizational change, and implementation science have been asking a question that is at the heart of today's early care and education quality improvement efforts: When it comes to changing one's behavior, what makes a person ready to change? Although the concept of readiness to…

  12. Management assessment of tank waste remediation system contractor readiness to proceed with phase 1B privatization

    International Nuclear Information System (INIS)

    Certa, P.J.

    1998-01-01

    Readiness to Proceed With Phase 1B Privatization documents the processes used to determine readiness to proceed with tank waste treatment technologies from private industry, now known as TWRS privatization. An overall systems approach was applied to develop action plans to support the retrieval and disposal mission of the TWRS Project. The systems and infrastructure required to support the mission are known. Required systems are either in place or plans have been developed to ensure they exist when needed. Since October 1996 a robust system engineering approach to establishing integrated Technical Baselines, work breakdown structures, tank farms organizational structure and configurations, work scope, and costs has become part of the culture within the TWRS Project. An analysis of the programmatic, management, and technical activities necessary to declare readiness to proceed with execution of the mission demonstrates that the system, personnel, and hardware will be on line and ready to support the private contractors. The systems approach included defining the retrieval and disposal mission requirements and evaluating the readiness of the Project Hanford Management Contract (PHMC) team to support initiation of waste processing by the private contractors in June 2002 and to receive immobilized waste shortly thereafter. The Phase 1 feed delivery requirements from the private contractor Requests for Proposal were reviewed. Transfer piping routes were mapped, existing systems were evaluated, and upgrade requirements were defined

  13. Category 3 investigation-derived waste Readiness Evaluation Plan

    International Nuclear Information System (INIS)

    Ludowise, J.D.

    1996-08-01

    This Readiness Evaluation Plan presents the methodology used to assess the readiness for loading investigation-derived waste (IDW) drums on trucks for transport to the Environmental Restoration Disposal Facility (ERDF). The scope of this Readiness Evaluation Plan includes an assessment of the organizations, procedures, and regulatory approvals necessary for the handling of IDW containers and the subsequent transportation of materials to ERDF

  14. The psychometric properties of the Readiness and Motivation Questionnaire: a symptom-specific measure of readiness for change in the eating disorders.

    Science.gov (United States)

    Geller, Josie; Brown, Krista E; Srikameswaran, Suja; Piper, William; Dunn, Erin C

    2013-09-01

    Readiness for change, as assessed by the readiness and motivation interview (RMI), predicts a number of clinical outcome variables in eating disorders including enrollment in intensive treatment, symptom change, dropout, and relapse. Although clinically useful, the training and administration of the RMI is time consuming. The purpose of this research was to (a) develop a self-report, symptom-specific version of the RMI, the readiness and motivation questionnaire (RMQ), that can be used to assess readiness for change across all eating disorder diagnoses and (b) establish its psychometric properties. The RMQ provides stage of change, internality, and confidence scores for each of 4 eating disorder symptom domains (restriction, bingeing, and cognitive and compensatory behaviors). Individuals (N = 244) with current eating disorder diagnoses completed the RMQ and measures of convergent, discriminant, and criterion validity. Similar to the RMI scores, readiness scores on the RMQ differed according to symptom domain. Regarding criterion validity, RMQ scores were significantly associated with ratings of anticipated difficulty of recovery activities and completion of recovery activities. The RMQ contributed significant unique variance to anticipated difficulty of recovery activities, beyond those accounted for by the RMI and a questionnaire measure of global readiness. The RMQ is thus an acceptable alternative to the RMI, providing global and domain-specific readiness information when time or cost prohibits use of an interview.

  15. Teenage employment and career readiness.

    Science.gov (United States)

    Greene, Kaylin M; Staff, Jeremy

    2012-01-01

    Most American youth hold a job at some point during adolescence, but should they work? This article presents a broad overview of teenage employment in the United States. It begins by describing which teenagers work and for how long and then focuses attention on the consequences (both good and bad) of paid work in adolescence. It then presents recent nationally representative data from the Monitoring the Future Study suggesting that limited hours of paid work do not crowd out developmentally appropriate after-school activities. A review of the literature also supports the idea that employment for limited hours in good jobs can promote career readiness and positive development. The article concludes with a discussion of the implications of youth work for practitioners and policymakers who are delivering career-related programming. Copyright © 2012 Wiley Periodicals, Inc., A Wiley Company.

  16. MOD-RTG multicouple test results and mission readiness

    International Nuclear Information System (INIS)

    Hartman, R.F.; Kelly, C.E.

    1993-01-01

    MOD-RTG represents the design configuration for the next generation of Radioisotope Thermoelectric Generators (RTG), aimed at improving specific power and efficiency over current General Purpose Heat Source Radioisotope Thermoelectric Generators (GPHS-RTGs). The modular RTG reference design has been described in previous papers (Hartman 1988). The multicouple is a key element required for the successful development of the modular RTG. The multicouple is a high voltage, thermoelectric device employing a close packed, glass bonded thermopile array of twenty thermoelectric couples, connected in a series circuit. The multicouple is designed to operate at a 1270 K hot junction temperature and a 570 K cold junction temperature, yielding a power output of approximately 2.1 watts at 3.5 volts at beginning of life. The objectives of the MOD-RTG program are focused on establishing a multicouple life test data base and life prediction capability which will permit, with reasonable margin, a projected multicouple life of greater than eight (8) years. This paper summarizes the current status of multicouple life testing and performance modeling and the level of technology readiness needed to demonstrate mission readiness for MOD-RTG

  17. What are the characteristics of 'sexually ready' adolescents? Exploring the sexual readiness of youth in urban poor Accra.

    Science.gov (United States)

    Biney, Adriana A E; Dodoo, F Nii-Amoo

    2016-01-05

    Adolescent sexual activity, especially among the urban poor, remains a challenge. Despite numerous interventions and programs to address the negative consequences arising from early and frequent sexual activity among youth in sub-Saharan Africa, including Ghana, only slight progress has been made. A plausible explanation is that our understanding of what adolescents think about sex and about their own sexuality is poor. In that sense, examining how adolescents in urban poor communities think about their sexual readiness, and identifying characteristics associated with that sexual self-concept dimension, should deepen our understanding of this topical issue. A total of 196 male and female adolescents, ages 12 to 19, were surveyed in the 2011 RIPS Urban Health and Poverty Project in Accra, Ghana. The youth responded to three statements which determined their levels of sexual readiness. Other background characteristics were also obtained enabling the assessment of the correlates of their preparedness to engage in sex. The data were analyzed using ordered logistic regression models. Overall, the majority of respondents did not consider themselves ready for sex. Multivariate analyses indicated that sexual experience, exposure to pornographic movies, gender, ethnicity and household wealth were significantly linked to their readiness for sex. Sexual readiness is related to sexual activity as well as other characteristics of the adolescents, suggesting the need to consider these factors in the design of programs and interventions to curb early sex. The subject of sexual readiness has to be investigated further to ensure adolescents do not identify with any negative effects of this sexual self-view.

  18. Measuring Success: David Conley's College Readiness Framework and the Illinois College and Career Readiness Act. In Brief

    Science.gov (United States)

    Baber, Lorenzo D.; Castro, Erin L.; Bragg, Debra D.

    2010-01-01

    The purpose of this brief is to understand the Illinois College and Career Readiness (CCR) Act in light of David Conley's college readiness model. Although not mentioned specifically by the Illinois statute, evaluation results gathered by the Office of Community College Research and Leadership (OCCRL) show alignment between a number of programs…

  19. Cone penetrometer demonstration standard startup review checklist

    International Nuclear Information System (INIS)

    KRIEG, S.A.

    1998-01-01

    Startup readiness for the Cone Penetrometer Demonstration in AX Tank Farm will be verified through the application of a Standard Startup Review Checklist. This is a listing of those items essential to demonstrating readiness to start the Cone Penetrometer Demonstration in AX Tank Farm

  20. Technologies and mechanisms for safety control of ready-to-eat muscle foods: an updated review.

    Science.gov (United States)

    Jiang, Jiang; Xiong, Youling L

    2015-01-01

    Ready-to-eat (RTE) muscle foods refer to a general category of meat and poultry products that are fully cooked and consumable without reheating. These products, including whole and sliced pork, beef, turkey, chicken, and variety of meats, in the forms of ham, roast, rolls, sausage, and frankfurter, are widely available in the delicatessen section of retail stores or various food service outlets. However, difficulties in avoidance of contamination by foodborne pathogens, notably Listeria monocytogenes, during product postlethality repackaging render RTE meats labile to outbreaks. Accordingly, the USDA-FSIS has established processing guidelines and regulations, which are constantly updated, to minimize foodborne pathogens in RTE products. Technologies that complement good manufacturing practice have been developed to control RTE meat safety. Among them, various antimicrobial product formulations, postpackaging pasteurization (thermal and nonthermal), and antimicrobial packaging are being used. Through these efforts, outbreaks linked to RTE meat consumption have substantially reduced in recent years. However, the pervasive and virulent nature of L. monocytogenes and the possible presence of other cold-tolerant pathogens entail continuing developments of new intervention technologies. This review updates existing and emerging physical and chemical methods and their mode of action to inactivate or inhibit threatening microorganisms in RTE muscle foods.

  1. Abattoir operations and waste management in Nigeria: A review of ...

    African Journals Online (AJOL)

    Abattoir operations and waste management in Nigeria: A review of challenges ... Log in or Register to get access to full text downloads. ... militating against the establishment, operations and management of abattoirs are not given attention.

  2. Objectively measuring pain using facial expression: is the technology finally ready?

    Science.gov (United States)

    Dawes, Thomas Richard; Eden-Green, Ben; Rosten, Claire; Giles, Julian; Governo, Ricardo; Marcelline, Francesca; Nduka, Charles

    2018-03-01

    Currently, clinicians observe pain-related behaviors and use patient self-report measures in order to determine pain severity. This paper reviews the evidence when facial expression is used as a measure of pain. We review the literature reporting the relevance of facial expression as a diagnostic measure, which facial movements are indicative of pain, and whether such movements can be reliably used to measure pain. We conclude that although the technology for objective pain measurement is not yet ready for use in clinical settings, the potential benefits to patients in improved pain management, combined with the advances being made in sensor technology and artificial intelligence, provide opportunities for research and innovation.

  3. Instructional Alignment of Workplace Readiness Skills in Marketing Education

    Science.gov (United States)

    Martin, Sarah J.; Reed, Philip A.

    2015-01-01

    This study examined high school marketing education teachers' knowledge of workplace readiness skills and whether that knowledge had an impact on student workplace readiness skill achievement. Further, this study examined the usage of Virginia's 13 Workplace Readiness Skills curriculum and identified the teaching methods and instructional…

  4. Ready for practice: what child and family health nurses say about education.

    Science.gov (United States)

    Fowler, Cathrine; Schmied, Virginia; Psaila, Kim; Kruske, Sue; Rossiter, Chris

    2015-02-01

    Australia has a well-established universal child and family health service predominately staffed by specialist/qualified child and family health nurses. Two common and interrelated concerns are the need for nurses to be ready for practice after completing a nursing education program and the means to ensure ongoing nursing competence. To investigate the readiness of CFH nurses to practise after qualification and their continuing engagement with learning. The study used an interpretive descriptive approach. This paper presents data from four questions from a larger survey of child and family health nurses across Australia. 1098 child and family health nurses responded to the survey. Qualitative survey responses from the four education questions were analysed using inductive thematic content analysis. Five significant themes were identified: hands-on experience (student clinical practice/placement); drawing on prior experience; learning on the job; learning (learning over time); and barriers to learning. This paper provides insights into nurses' readiness for practice at the completion of a postgraduate child and family health nursing qualification and their maintenance of competence and specialist knowledge. It highlights: the need for clinical placement to be retained and enhanced; the significant contribution of more experienced child and family health nurses mentoring newly graduated child and family health nurses; the need for minimum education standards; the importance of reviewing education courses in relation to graduates' readiness for child and family health nursing practice; the importance of supporting ongoing professional development; and the removal of barriers to accessing education opportunities. Copyright © 2014 Elsevier Ltd. All rights reserved.

  5. What Are the ACT College Readiness Benchmarks? Information Brief

    Science.gov (United States)

    ACT, Inc., 2013

    2013-01-01

    The ACT College Readiness Benchmarks are the minimum ACT® college readiness assessment scores required for students to have a high probability of success in credit-bearing college courses--English Composition, social sciences courses, College Algebra, or Biology. This report identifies the College Readiness Benchmarks on the ACT Compass scale…

  6. Operating experience review for nuclear power plants in the Systematic Evaluation Program

    International Nuclear Information System (INIS)

    Mays, G.T.; Harrington, K.H.

    1982-01-01

    The Systematic Evaluation Program Branch (SEPB) of the Nuclear Regulatory Commission (NRC) is conducting the Systematic Evaluation Program (SEP) whose purpose is to determine the safety margins of the design and operation of the eleven oldest operating commercial nuclear power plants in the United States. This paper describes the methodology and results of the operational experience review portion of the SEP evaluation. SEPB will combine the results from these operational reviews with other safety topic evaluations to perform an integrated assessment of the SEP plants

  7. Quality and Operations Management in Food Supply Chains: A Literature Review

    Directory of Open Access Journals (Sweden)

    Yong He

    2018-01-01

    Full Text Available We present a literature review on quality and operations management problems in food supply chains. In food industry, the quality of the food products declines over time and should be addressed in the supply chain operations management. Managing food supply chains with operations management methods not only generates economic benefit, but also contributes to environmental and social benefits. The literature on this topic has been burgeoning in the past few years. Since 2005, more than 100 articles have been published on this topic in major operations research and management science journals. In this literature review, we concentrate on the quantitative models in this research field and classify the related articles into four categories, that is, storage problems, distribution problems, marketing problems, and food traceability and safety problems. We hope that this review serves as a reference for interested researchers and a starting point for those who wish to explore it further.

  8. Inspection-Class Remotely Operated Vehicles—A Review

    Directory of Open Access Journals (Sweden)

    Romano Capocci

    2017-03-01

    Full Text Available This paper presents a review of inspection-class Remotely Operated Vehicles (ROVs. The review divides the classification of inspection-class ROVs; categorising the vehicles in order of size and capability. A state of the art technology review is undertaken, discussing various common subsystems of the ROV. Standard and novel ROV shapes and designs are reviewed, with emphasis on buoyancy, frame materials and hydrodynamics. Several power considerations and designs are discussed, accounting for battery fed and mains fed systems. ROV telemetry is split into a discussion on the various transmission hardware systems and the communication protocols that are most widely used in industry and research today. A range of thruster technologies is then introduced with consideration taken of the various thruster architectures available. Finally, the navigation and positioning sensors employed for ROV navigation and control are reviewed. The author has also created a number of comparison tables throughout the review; tables include comparison of wired data transmission technology, comparison of common ROV communication protocols and comparisons of various inertial navigation systems. By the end of the review the reader will have clearer understanding on the fundamentals of inspection-class ROV technologies and can use this as an introduction to further paper investigation.

  9. A Model of Feeding Readiness for Preterm Infants

    OpenAIRE

    Pickler, Rita H.

    2004-01-01

    This paper presents a theoretical model of bottle feeding readiness in preterm infants, which hypothesizes relationships between bottle feeding readiness, experience, and outcomes. The synactive theory of development provided the conceptual foundation for the model. The model, which is currently being tested, is designed to establish bottle feeding readiness criteria that will help nurses decide when to offer a bottle to a preterm infant The model may also provide a useful framework for deter...

  10. Smart Grid Technology and Consumer Call Center Readiness

    OpenAIRE

    Schamber, Kelsey L.

    2010-01-01

    The following reasearch project deals with utility call center readiness to address customer concerns and questions about the Smart Grid and smart meter technology. Since consumer engagement is important for the benefits of the Smart Grid to be realized, the readiness and ability of utilities to answer consumer questions is an important issue. Assessing the readiness of utility call centers to address pertinant customer concerns was accomplished by calling utility call centers with Smart Grid...

  11. Transitioning from operations to environmental restoration: Startup of the Fernald Environmental Restoration Management Contract

    International Nuclear Information System (INIS)

    Little, C.C.; Kozlowski, D.R.

    1993-10-01

    This paper will present a description of the program undertaken by the Fernald Environmental Restoration Management Contractor (ERMC) to effect a transition from operation of the Fernald site by the past M ampersand O contractor, WEMCO, to DOE's new mission and contractual approach focussed on site remediation. This transition, on a first of its kind contract, represented a significant, proactive approach on the part of DOE to pursue the clean up of its weapon's production facilities in a faster, more cost-effective manner. The paper will discuss the formal transition readiness review process and the lessons teamed by DOE and the contractor during transition. The oral presentation will be shared by both authors with one half of the time allocated to the transition readiness demonstration process and one half to the lessons learned. The objective of having a Department of Energy (DOE) Headquarters representative participate in the transition to the first ERMC was to develop a handbook to assist other sites proceeding with the ERMC concept, such as the Richland Operations Office, and to develop a lessons learned document. Because a lessons learned report is available separately, only those more significant lessons learned are highlighted in this paper

  12. British Columbia Power Export Corporation: Operational review for operating year, October 1989 to September 1990

    International Nuclear Information System (INIS)

    1990-01-01

    The British Columbia Power Export Corporation (POWEREX) is a wholly owned subsidiary of British Columbia Hydro, established in 1988 as the single agency responsible for implementing the provincial policy of international electricity trade. POWEREX objectives are to conduct long term firm electricity trade utilizing private sector financing, operating capabilities, and generating sources. Short term electricity transactions are handled by the part of POWEREX called the Powerex Pool Operation. An operational review of POWEREX for 1989-90 is presented, giving information on export contracts, license approvals, export sales negotiations, pool operation revenues and sales, British Columbia Hydro generation and integrated system performance, and operational planning. 15 figs

  13. Organisational readiness: exploring the preconditions for success in organisation-wide patient safety improvement programmes.

    Science.gov (United States)

    Burnett, Susan; Benn, Jonathan; Pinto, Anna; Parand, Anam; Iskander, Sandra; Vincent, Charles

    2010-08-01

    Patient safety has been high on the agenda for more than a decade. Despite many national initiatives aimed at improving patient safety, the challenge remains to find coherent and sustainable organisation-wide safety-improvement programmes. In the UK, the Safer Patients' Initiative (SPI) was established to address this challenge. Important in the success of such an endeavour is understanding 'readiness' at the organisational level, identifying the preconditions for success in this type of programme. This article reports on a case study of the four NHS organisations participating in the first phase of SPI, examining the perceptions of organisational readiness and the relationship of these factors with impact by those actively involved in the initiative. A mixed-methods design was used, involving a survey and semistructured interviews with senior executive leads, the principal SPI programme coordinator and the four operational leads in each of the SPI clinical work areas in all four organisations taking part in the first phase of SPI. This preliminary work would suggest that prior to the start of organisation-wide quality- and safety-improvement programmes, organisations would benefit from an assessment of readiness with time spent in the preparation of the organisational infrastructure, processes and culture. Furthermore, a better understanding of the preconditions that mark an organisation as ready for improvement work would allow policymakers to set realistic expectations about the outcomes of safety campaigns.

  14. Sustainability and Readiness for Change: Insights from a Banking Case Study in Serbia

    Directory of Open Access Journals (Sweden)

    Ljiljana Kontic

    2012-06-01

    Full Text Available This paper examines the issues of sustainable banking and readiness for change using the mixed methods research approach. The research setting consisted of an international bank which operates in Serbia. Serbia is one of Western Balkan countries. The concept of sustainability is well explored in developed countries. The financial institutions from Serbia have not been included in those studies. This paper suggests key issues which need to be addressed related to the sustainability and change in the banking sector in Serbia. The main aim of this study is to assess sustainability and readiness for change in transition environment. This paper contributes to the existing literature by assessing readiness for change in selected bank. Regarding different characteristics of national cultures, the construct validity of research methodology developed in one society will be investigated for a Serbian sample. The qualitative data about sustainability were sourced from publicly available information about bank. The Organizational Diagnosis Questionnaire (ODQ developed by Preziosi (1980 is used to assess the bank's readiness for change. The sample consisted of 137 managers different socio demographic variables from bank. The research findings revealed possible practical implementation of ODQ in Serbia. The sustainable attitude of the bank is rewarded by different organizations in Serbia. The results revealed that changes in the bank should be led top down. The findings add to the existing literature on factors causing organizational effectiveness in cross-cultural organizational contexts. The practical implementation and study limitation are suggested.

  15. Students’ Readiness for E-learning Application in Higher Education

    Directory of Open Access Journals (Sweden)

    Atousa Rasouli

    2016-07-01

    Full Text Available The main goal of this research was to investigate the readiness of art students in applying e-learning. This study adopted a survey research design. From three public Iranian Universities (Alzahra, Tarbiat Modares, and Tehran, 347 students were selected by multistage cluster sampling and via Morgan Table. Their readiness for E-learning application was assessed by a self-developed questionnaire. Data analysis was done by indexes of descriptive statistics and one sample t-test. Analysis of results found a significant relationship between the readiness of undergraduate students, graduate students, and post-graduate students to apply E-learning, but there was no significant relationship between students’ readiness and gender, university, and subject. Results revealed that Art students were in a moderate level of readiness for applying E-learning.

  16. “Getting Ready for School:” A Preliminary Evaluation of a Parent-Focused School-Readiness Program

    Directory of Open Access Journals (Sweden)

    Kimberly G. Noble

    2012-01-01

    Full Text Available Children from disadvantaged backgrounds tend to start school with fewer school readiness skills than their more advantaged peers. Emergent literacy and math skills play an important role in this gap. The family is essential in helping children build these skills, and the active involvement of families is crucial to the success of any intervention for young children. The Getting Ready for School (GRS program is a parent-focused curriculum designed to help parents equip their children with the skills and enthusiasm necessary for learning when they start school. Parents meet in weekly workshops led by a trained facilitator and implement the curriculum at home with their children. The objective of this pilot study was to assess the promise of the GRS intervention in children participating in an urban Head Start program and to explore parents' responses to the intervention. We hypothesized that participation in GRS would improve school readiness in literacy and math skills, relative to participation in business-as-usual Head Start. Four Head Start classrooms (two randomly selected “intervention” and two “comparison” classrooms participated in this study. Preliminary analyses suggest that GRS improves school readiness over and above a Head Start-as-usual experience. Implications for early childhood programs and policies are discussed.

  17. Management assessment of tank waste remediation system contractor readiness to proceed with phase 1B privatization

    International Nuclear Information System (INIS)

    Honeyman, J.O.

    1998-01-01

    This Management Assessment of Tank Waste Remediation System (TWRS) Contractor Readiness to Proceed With Phase 1B Privatization documents the processes used to determine readiness to proceed with tank waste treatment technologies from private industry, now known as TWRS privatization. An overall systems approach was applied to develop action plans to support the retrieval and disposal mission of the TWRS Project. The systems and infrastructure required to support the mission are known. Required systems are either in place or plans have been developed to ensure they exist when needed. Since October 1996 a robust system engineering approach to establishing integrated Technical Baselines, work breakdown structures, tank farms organizational structure and configurations, work scope, and costs has become part of the culture within the TWRS Project. An analysis of the programmatic, management, and technical activities necessary to declare readiness to proceed with execution of the mission demonstrates that the system, personnel, and hardware will be on-line and ready to support the private contractors. The systems approach included defining the retrieval and disposal mission requirements and evaluating the readiness of the Project Hanford Management Contract (PHMC) team to support initiation of waste processing by the private contractors in June 2002 and to receive immobilized waste shortly thereafter. The Phase 1 feed delivery requirements from the private contractor Requests for Proposal were reviewed. Transfer piping routes were mapped, existing systems were evaluated, and upgrade requirements were defined

  18. A Proposed Conceptual Model of Military Medical Readiness

    National Research Council Canada - National Science Library

    Van Hall, Brian M

    2007-01-01

    .... The purpose of this research is to consolidate existing literature on the latent variable of medical readiness, and to propose a composite theoretical model of medical readiness that may provide...

  19. Operational readiness verification, phase 1: A study on safety during outage and restart of nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Hollnagel, E. [Linkoeping Univ. (Sweden). Dept. of Computer and Information Science; Gauthereau, V. [Linkoeping Univ. (Sweden). Dept. of Industrial Engineering

    2001-06-01

    This report contains the findings from the first phase of a study on safety during outage and restart of nuclear power plants. Operational Readiness Verification (ORV) - in Swedish called Driftklarhetsverifiering (DKV) - refers to the test and verification activities that are necessary to ensure that plant systems are able to provide their required functions when needed - more concretely that all plant systems are in their correct functional state when the plant is restarted after an outage period. The concrete background for this work is that nine ORV related incidents were reported in Sweden between July 1995 and October 1998. The work reported here comprised a literature survey of research relevant for ORV issues, and an assessment of the present situation at Swedish NPPs with respect to ORV. The literature survey was primarily aimed at research related to NPPs, but also looked at domains where similar problems have occurred, such as maintenance in commercial aviation. The survey looked specifically for organisational and MTO aspects relevant to the present situation in Swedish NPPs. One finding was that ORV should be seen as an integral part of maintenance, rather than as a separate activity. Another, that there is a characteristic distribution of error modes for maintenance and ORV, with many sequence errors and omissions, rather than a set of unique error modes. An international study further showed that there are important differences in how procedures are used, and in the balance between decentralisation and centralisation. Several studies also suggested that ORV could usefully be described as a barrier system in relation to the flow of work, for instance using the following five stages: (1) preventive actions during maintenance/outage, (2) post-test after completion of work, (3) pre-test before start-up, (4) the start-up sequence itself, and (5) preventive actions during power operation - possibly including automatic safety systems. In the field survey

  20. Operational readiness verification, phase 1: A study on safety during outage and restart of nuclear power plants

    International Nuclear Information System (INIS)

    Hollnagel, E.; Gauthereau, V.

    2001-06-01

    This report contains the findings from the first phase of a study on safety during outage and restart of nuclear power plants. Operational Readiness Verification (ORV) - in Swedish called Driftklarhetsverifiering (DKV) - refers to the test and verification activities that are necessary to ensure that plant systems are able to provide their required functions when needed - more concretely that all plant systems are in their correct functional state when the plant is restarted after an outage period. The concrete background for this work is that nine ORV related incidents were reported in Sweden between July 1995 and October 1998. The work reported here comprised a literature survey of research relevant for ORV issues, and an assessment of the present situation at Swedish NPPs with respect to ORV. The literature survey was primarily aimed at research related to NPPs, but also looked at domains where similar problems have occurred, such as maintenance in commercial aviation. The survey looked specifically for organisational and MTO aspects relevant to the present situation in Swedish NPPs. One finding was that ORV should be seen as an integral part of maintenance, rather than as a separate activity. Another, that there is a characteristic distribution of error modes for maintenance and ORV, with many sequence errors and omissions, rather than a set of unique error modes. An international study further showed that there are important differences in how procedures are used, and in the balance between decentralisation and centralisation. Several studies also suggested that ORV could usefully be described as a barrier system in relation to the flow of work, for instance using the following five stages: (1) preventive actions during maintenance/outage, (2) post-test after completion of work, (3) pre-test before start-up, (4) the start-up sequence itself, and (5) preventive actions during power operation - possibly including automatic safety systems. In the field survey

  1. Operational readiness verification, phase 1: A study on safety during outage and restart of nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Hollnagel, E [Linkoeping Univ. (Sweden). Dept. of Computer and Information Science; Gauthereau, V [Linkoeping Univ. (Sweden). Dept. of Industrial Engineering

    2001-06-01

    This report contains the findings from the first phase of a study on safety during outage and restart of nuclear power plants. Operational Readiness Verification (ORV) - in Swedish called Driftklarhetsverifiering (DKV) - refers to the test and verification activities that are necessary to ensure that plant systems are able to provide their required functions when needed - more concretely that all plant systems are in their correct functional state when the plant is restarted after an outage period. The concrete background for this work is that nine ORV related incidents were reported in Sweden between July 1995 and October 1998. The work reported here comprised a literature survey of research relevant for ORV issues, and an assessment of the present situation at Swedish NPPs with respect to ORV. The literature survey was primarily aimed at research related to NPPs, but also looked at domains where similar problems have occurred, such as maintenance in commercial aviation. The survey looked specifically for organisational and MTO aspects relevant to the present situation in Swedish NPPs. One finding was that ORV should be seen as an integral part of maintenance, rather than as a separate activity. Another, that there is a characteristic distribution of error modes for maintenance and ORV, with many sequence errors and omissions, rather than a set of unique error modes. An international study further showed that there are important differences in how procedures are used, and in the balance between decentralisation and centralisation. Several studies also suggested that ORV could usefully be described as a barrier system in relation to the flow of work, for instance using the following five stages: (1) preventive actions during maintenance/outage, (2) post-test after completion of work, (3) pre-test before start-up, (4) the start-up sequence itself, and (5) preventive actions during power operation - possibly including automatic safety systems. In the field survey

  2. A Study of Fleet Surgical Teams Readiness Posture in Amphibious Readiness Groups

    National Research Council Canada - National Science Library

    Tennyson, Ruby

    2000-01-01

    This thesis describes and evaluates Fleet Surgical Teams (FSTs). It examines how Navy Medicine adapted FSTs to changing support requirements associated with the Total Health Care Support Readiness Requirement (THCSRR...

  3. Recent experiences in the development of locally-produced ready to use foods

    International Nuclear Information System (INIS)

    Ryan, Kelsey; Manary, Mark

    2014-01-01

    Ready-to-use foods for treatment of moderate acute malnutrition (MAM) are micronutrient-fortified, lipid pastes containing roasted peanuts, oil, micronutrients, sugar, soy and/or dairy ingredient powders. The benefits of pastes like ready-to-use therapeutic food (RUTF), ready-to-use supplementary food (RUSF), and lipid nutrient supplements (LNS) for the treatment of nutritional maladies are that they are shelf-stable due to their low water activity, they are easily transportable, and they can be eaten as-is. Since the development of ready-to-use foods, cost reduction and local production experimentation have been ongoing. Attempts to replace ingredients like skim milk powder with alternate dairy protein ingredients or non-animal ingredients have been reported, but little food and process development information has been revealed. Linear programming or least-cost optimization mathematical models have been employed to help design low cost paste formulas from a selection of ingredients that also meet nutritional requirements. A new user-friendly tool can be used to develop new formulas that incorporate locally-sourced ingredients. New approaches to ingredient utilization are necessary for future ready-to-use food production and will require the development of novel processes for local ingredients compared to traditional pastes. The challenges of incorporating novel ingredients include processing changes, flavor and acceptability, and meeting nutrient requirements. Our research is designed to not only look at substitute ingredients, but also to optimize processing conditions in order to reduce cost by energy savings, extended shelf-life, and lower nutrient degradation. An RUSF using a novel dairy ingredient, whey permeate, was recently developed and is currently being tested in a prospective, double-blind randomized clinical trial for children with MAM in Malawi. Recent research in the development and testing of ready-to-use foods for MAM include a programmatic study

  4. Readiness for organisational change among general practice staff.

    Science.gov (United States)

    Christl, B; Harris, M F; Jayasinghe, U W; Proudfoot, J; Taggart, J; Tan, J

    2010-10-01

    Increasing demands on general practice to manage chronic disease may warrant organisational change at the practice level. Staff's readiness for organisational change can act as a facilitator or barrier to implementing interventions aimed at organisational change. To explore general practice staff readiness for organisational change and its association with staff and practices characteristics. This is a cross-sectional study of practices in three Australian states involved in a randomised control trial on the effectiveness of an intervention to enhance the role of non-general practitioner staff in chronic disease management. Readiness for organisational change, job satisfaction and practice characteristics were assessed using questionnaires. 502 staff from 58 practices completed questionnaires. Practice characteristics were not associated with staff readiness for change. A multilevel regression analysis showed statistically significant associations between staff readiness for organisational change (range 1 to 5) and having a non-clinical staff role (vs general practitioner; B=-0.315; 95% CI -0.47 to -0.16; pchange which addresses the mix of practice staff. Moderately low job satisfaction may be an opportunity for organisational change.

  5. PERFORMANCES PARENTS ABOUT EMOTIONAL READINESS OF THE CHILD TO SCHOOL WHEN ANALYZING THE CHARACTERISTICS OF EMOTIONAL READINESS OF CHILDREN IN THE TRANSITION FROM KINDERGARTEN TO FIRST GRADE

    Directory of Open Access Journals (Sweden)

    Ekaterina Sergeevna Novitskaya

    2016-02-01

    Full Text Available The article examines the importance of emotional understanding of parents child’s readiness for school. The aim of the study was to determine the characteristics of parental influence perceptions about the emotional readiness of children to the actual level of emotional readiness of the child. An experimental study was conducted comparing the methods, testing, questionnaires, observations, interviews, expert assessments, Longitude. We compared the performance of emotional readiness of children in the preparatory group of the kindergarten and the beginning of the school year in first grade. The study revealed that parents consider the emotional readiness primarily in the structure of the psychological readiness; representations of parents about the emotional readiness to occupy the last place among the other groups of ideas. Weak concrete definition of representations of parents about the emotional school readiness issues contributes to the emotional sphere of the child at an early stage of learning in first grade.

  6. Concept of economic readiness levels assessment

    Science.gov (United States)

    Yuniaristanto, Sutopo, W.; Widiyanto, A.; Putri, A. S.

    2017-11-01

    This research aims to build a concept of Economic Readiness Level (ERL) assessment for incubation center. ERL concept is arranged by considering both market and business aspects. Every aspect is divided into four phases and each of them consists of some indicators. Analytic Hierarchy Process (AHP) is used to develop the ERL in calculating the weight of every single aspect and indicator. Interval scale between 0 and 4 is also applied in indicator assessment. In order to calculate ERL, score in every indicator and the weight of both the aspect and indicator are considered. ERL value is able to show in detail the innovative product readiness level from economic sight, market and business aspect. There are four levels in Economic Readiness Level scheme which are investigation, feasibility, planning and introduction.

  7. E-Learning Readiness in Medicine: Turkish Family Medicine (FM) Physicians Case

    Science.gov (United States)

    Parlakkiliç, Alaattin

    2015-01-01

    This research investigates e-learning readiness level of family medicine physicians (FM) in Turkey. The study measures the level of e-learning readiness of Turkish FM physicians by an online e-learning readiness survey. According to results five areas are ready at Turkish FM physicians but need a few improvements:…

  8. Strategic leadership will be essential for dietitian eHealth readiness: A qualitative study exploring dietitian perspectives of eHealth readiness.

    Science.gov (United States)

    Maunder, Kirsty; Walton, Karen; Williams, Peter; Ferguson, Maree; Beck, Eleanor

    2018-05-16

    To explore dietitians' perspectives on the eHealth readiness of Australian dietitians, and to identify strategies to improve eHealth readiness of the profession. Dietitians who met the criteria for nutrition informatics experts participated in semi-structured interviews between June 2016 and March 2017. The interviews were recorded and transcribed verbatim. Thematic analysis using coding was undertaken until consensus was reached by the researchers regarding key themes, topics and exemplar quotes. Interviews with 10 nutrition informatics experts revealed 25 discussion topics grouped into four main themes: benefits of eHealth for dietitians; risks of dietitians not being involved in eHealth; dietitians are not ready for eHealth; and strategies to improve eHealth readiness. The strategies identified for improving eHealth readiness included: collaboration and representation, education, offering of incentives and mentoring, as well as development of a national strategy, organisational leaders, nutrition informatics champions and a supportive environment. These findings suggest that dietitians may not be ready for eHealth. Strategic leadership and the actioning of other identified strategies will be imperative to preparing dietitians for eHealth to ensure the profession can practice effectively in the digital age, optimise nutrition care and support research for eHealth. If dietitians do not engage in eHealth, others may take their place, or dietitians may be forced to use eHealth in ways that are not the most effective for practice or maximising patient outcomes. © 2018 Dietitians Association of Australia.

  9. Developmental Readiness of Normal Full Term Infants To Progress from Exclusive Breastfeeding to the Introduction of Complementary Foods: Reviews of the Relevant Literature Concerning Infant Immunologic, Gastrointestinal, Oral Motor and Maternal Reproductive and Lactational Development.

    Science.gov (United States)

    Naylor, Audrey J., Ed.; Morrow, Ardythe L., Ed.

    This review of the developmental readiness of normal, full-term infants to progress from exclusive breastfeeding to the introduction of complementary foods is the result of the international debate regarding the best age to introduce complementary foods into the diet of the breastfed human infant. After a list of definitions, four papers focus on:…

  10. Survey on the Technology Readiness Level of R and D projects for a Technical Risk Management

    International Nuclear Information System (INIS)

    Song, S. J.; Chang, J.; Lee, K. Y.

    2008-01-01

    The purpose of applying the Technology Readiness Level/Design Readiness Level (TRL/DRL) in technical risk management is to make technology assessments, and improve communication among researchers with a consistent, systematic technology readiness Technical risk management for the Nuclear Hydrogen Production project was adopted of experience assessed with Delphi Method from the Next Generation Nuclear Plant(NGNP)of the DOE to improve the poor contactor management of the major projects which experienced cost increases and/or schedule delays in long-term. In the current phase that is doing key technology research and development projects, the technology readiness level was reviewed and applied to the Nuclear Hydrogen Production project to prepare an input for the next design phases. Based on the previous works, pre-conceptional design and key R and D works for the Nuclear Hydrogen Design and Development(NHDD) projects and the results of key research and development projects, the TRL was applied to assess the levels and compared with the advanced design stages of Westinghouse Electric Co. With this process, several issues were identified to apply the design and technology level to the familiar steps of design process and research and development projects. In order to resolve these issues, it is needed to systematically adjust and modify the current process with TRLs

  11. Diagnostics of children's school readiness in scientific studies abroad

    Directory of Open Access Journals (Sweden)

    Nazarenko V.V.

    2012-06-01

    Full Text Available The article considers the problem of children's school readiness as it is represented in contemporary studies of foreign scholars. It displays a variety of approaches to estimation of school readiness as well as the ways of measuring the levels of child development as relating to school readiness, namely those of them which are in common practice in education.

  12. Achieving year 2000 readiness: basic processes

    International Nuclear Information System (INIS)

    1999-03-01

    This document provides an approach or addressing safety and operability concerns related to Year 2000 (Y2K). Although it was prepared for nuclear power plants the methods described are applicable to other nuclear installations and to other industrial concerns. The basic goal was to provide a brief but comprehensive approach that may be used to discover, understand and correct the Y2K related problems. The document relies on certain basic expectations of the facility that would apply to any programme: ownership, management, knowledgeable participants, thorough application of the approach, documentation of efforts, quality assurance of products and compliance with all regulatory requirements. The IAEA has and will continue to be involved with Member States to assist them in implementing this document and achieving Y2K Readiness

  13. Achieving year 2000 readiness: basic processes

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    This document provides an approach or addressing safety and operability concerns related to Year 2000 (Y2K). Although it was prepared for nuclear power plants the methods described are applicable to other nuclear installations and to other industrial concerns. The basic goal was to provide a brief but comprehensive approach that may be used to discover, understand and correct the Y2K related problems. The document relies on certain basic expectations of the facility that would apply to any programme: ownership, management, knowledgeable participants, thorough application of the approach, documentation of efforts, quality assurance of products and compliance with all regulatory requirements. The IAEA has and will continue to be involved with Member States to assist them in implementing this document and achieving Y2K Readiness 12 refs, 3 figs

  14. IAEA Operational Safety Team Reviews Saint-Alban Nuclear Power Plant, France

    International Nuclear Information System (INIS)

    2010-01-01

    Full text: An international team of nuclear installation safety experts, led by the International Atomic Energy Agency (IAEA), has reviewed safety practices at France's Saint-Alban Nuclear Power Plant (NPP) and has highlighted a set of strong practices as well as a series of recommendations to reinforce them. The IAEA assembled the team at the request of the Government of France to conduct an Operational Safety Review (OSART) of the Saint-Alban NPP. Under the leadership of the IAEA's Division of Nuclear Installation Safety in Vienna, the OSART team performed an in-depth operational safety review from 20 September to 6 October 2010. The team was made up of experts from Belgium, Canada, the Czech Republic, Germany, Lithuania, the Netherlands, Slovakia, Sweden and the USA. An OSART mission is designed to review programmes and activities essential to operational safety. It is not a regulatory inspection, nor is it a design review or a substitute for an exhaustive assessment of the plant's overall safety status. The team at Saint-Alban conducted an in-depth review of the aspects essential to the safe operation of the NPP, which largely are under the control of the site management. The conclusions of the review are based on the IAEA's Safety Standards and proven good international practices. The review covered the areas of Management, Organization and Administration; Training and Qualification; Operations; Maintenance; Technical Support; Operating Experience; Radiation Protection; Chemistry; and Emergency Planning and Preparedness. The OSART team has identified good plant practices, which will be shared with the rest of the nuclear industry for consideration of their application. Examples include: A safety guideline for outages; The use of remote video surveillance of fuel inspection and handling activities; A motivational tool for plant staff regarding the benefits of operating experience and associated corrective actions; and Use of a sophisticated key control system

  15. IAEA Operational Safety Team Review Bohunice Nuclear Power Plant, Slovak Republic

    International Nuclear Information System (INIS)

    2010-01-01

    Full text: An international team of nuclear installation safety experts, led by the International Atomic Energy Agency (IAEA), has reviewed Slovakia's Bohunice Nuclear Power Plant (BNPP) for its safety practices and has noted a series of good practices as well as recommendations to reinforce them. The IAEA assembled an international team of experts at the request of the Government of Slovak Republic to conduct an Operational Safety Review (OSART) of Bohunice NPP. Under the leadership of the IAEA's Division of Nuclear Installation Safety, the OSART team performed an in-depth operational safety review from 1 to 18 November 2010. The team was made up of experts from Belgium, Canada, China, the Czech Republic, France, Sweden, the United Kingdom and the IAEA. An OSART mission is designed as a review of programmes and activities essential to operational safety. It is not a regulatory inspection, nor is it a design review or a substitute for an exhaustive assessment of the plant's overall safety status. The team at BNPP conducted an in-depth review of the aspects essential to the safe operation of the NPP, which largely is under the control of the site management. The conclusions of the review are based on the IAEA's Safety Standards and proven good international practices. The review covered the areas of Management, Organization and Administration; Operations; Maintenance; Technical Support; Operating Experience; Radiation Protection; Chemistry and Emergency Planning and Preparedness. Long Term Operation assessment has been requested by the plant in addition to the standard OSART program. The OSART team has identified good plant practices which will be shared with the rest of the nuclear industry for consideration of their application. Examples include: BNPP has implemented a comprehensive set of technical and organizational measures which have significantly reduced the production of liquid radioactive waste; BNPP has developed an automatic transfer of dosimetry data

  16. 30 CFR 773.9 - Review of applicant, operator, and ownership and control information.

    Science.gov (United States)

    2010-07-01

    ... operator's organizational structure and ownership or control relationships. (b) We must conduct the review... and control information. 773.9 Section 773.9 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION....9 Review of applicant, operator, and ownership and control information. (a) We, the regulatory...

  17. Democracy in schools: are educators ready for teacher leadership?

    Directory of Open Access Journals (Sweden)

    Elsabé de Villiers

    2011-01-01

    Full Text Available The aim of this research was to determine educators' perceptions of and readiness for teacher leadership. A total of 283 educators in the Eden and Central Karoo Education District in the Western Cape participated in the study. The participants included district officials, principals, and members of school management teams, as well as veteran, middle, and novice educators. A series of instruments was used to determine educators' perspectives, perceptions and readiness for teacher leadership, including the Teacher Leadership Readiness Instrument (TLRI. The results indicated that educators held positive assumptions about teacher leadership. Educators' preliminary leadership perceptions, assumptions about and readiness for teacher leadership proved that the majority of educators are ready for a more distributed, deep democratic leadership practice in schools. Educators acknowledged the need for continuous professional development in the area of teacher leadership. It was also found that as preliminary leadership perceptions of educators improve or strengthen, readiness for teacher leadership is also likely to improve or strengthen. These findings have significant implications for leadership practices, collaboration, capacity-building and improvement in schools, educators' self-esteem, motivation and productivity, as well as student outcomes.

  18. Overview: Texas College and Career Readiness Standards

    Science.gov (United States)

    Texas Higher Education Coordinating Board, 2009

    2009-01-01

    The Texas College and Career Readiness Standards define what students should know and be able to accomplish in order to succeed in entry-level college courses or skilled workforce opportunities upon graduation from high school. This paper answers the following questions: (1) Who developed the Texas College and Career Readiness Standards?; (2) What…

  19. Aging of nuclear station diesel generators: Evaluation of operating and expert experience: Phase 1, Study

    International Nuclear Information System (INIS)

    Hoopingarner, K.R.; Vause, J.W.; Dingee, D.A.; Nesbitt, J.F.

    1987-08-01

    Pacific Northwest Laboratory evaluated operational and expert experience pertaining to the aging degradation of diesel generators in nuclear service. The research, sponsored by the US Nuclear Regulatory Commission (NRC), identified and characterized the contribution of aging to emergency diesel generator failures. This report, Volume I, reviews diesel-generator experience to identify the systems and components most subject to aging degradation and isolates the major causes of failure that may affect future operational readiness. Evaluations show that as plants age, the percent of aging-related failures increases and failure modes change. A compilation is presented of recommended corrective actions for the failures identified. This study also includes a review of current, relevant industry programs, research, and standards. Volume II reports the results of an industry-wide workshop held on May 28 and 29, 1986 to discuss the technical issues associated with aging of nuclear service emergency diesel generators

  20. Cognitive Readiness of Students at Teacher Colleges to Support Individuals with Stigmatized Gender Identity and Sexual Orientation

    Science.gov (United States)

    Kuprienko, T. P.

    2015-01-01

    The article reviews the evidence of the professional readiness of future educational psychologists to perform professional functions, and consider the levels of general cognitive and psychological aptitude of students at teacher colleges to support people with stigmatized gender identity and sexual orientation. [This article was translated by…

  1. Personality, Motivation, and College Readiness: A Prospectus for Assessment and Development. Research Report. ETS RR-14-06

    Science.gov (United States)

    Kyllonen, Patrick C.; Lipnevich, Anastasiya A.; Burrus, Jeremy; Roberts, Richard D.

    2014-01-01

    This article concerns how noncognitive constructs--personality and motivation--can be assessed and developed to increase students' readiness for college. We propose a general framework to account for personality and motivational differences between students. We review numerous studies showing that personality and motivational factors are related…

  2. Organizational readiness in specialty mental health care.

    Science.gov (United States)

    Hamilton, Alison B; Cohen, Amy N; Young, Alexander S

    2010-01-01

    Implementing quality improvement efforts in clinics is challenging. Assessment of organizational "readiness" for change can set the stage for implementation by providing information regarding existing strengths and deficiencies, thereby increasing the chance of a successful improvement effort. This paper discusses organizational assessment in specialty mental health, in preparation for improving care for individuals with schizophrenia. To assess organizational readiness for change in specialty mental health in order to facilitate locally tailored implementation strategies. EQUIP-2 is a site-level controlled trial at nine VA medical centers (four intervention, five control). Providers at all sites completed an organizational readiness for change (ORC) measure, and key stakeholders at the intervention sites completed a semi-structured interview at baseline. At the four intervention sites, 16 administrators and 43 clinical staff completed the ORC, and 38 key stakeholders were interviewed. The readiness domains of training needs, communication, and change were the domains with lower mean scores (i.e., potential deficiencies) ranging from a low of 23.8 to a high of 36.2 on a scale of 10-50, while staff attributes of growth and adaptability had higher mean scores (i.e., potential strengths) ranging from a low of 35.4 to a high of 41.1. Semi-structured interviews revealed that staff perceptions and experiences of change and decision-making are affected by larger structural factors such as change mandates from VA headquarters. Motivation for change, organizational climate, staff perceptions and beliefs, and prior experience with change efforts contribute to readiness for change in specialty mental health. Sites with less readiness for change may require more flexibility in the implementation of a quality improvement intervention. We suggest that uptake of evidence-based practices can be enhanced by tailoring implementation efforts to the strengths and deficiencies of the

  3. Effectiveness of the Treatment Readiness and Induction Program for increasing adolescent motivation for change.

    Science.gov (United States)

    Becan, Jennifer E; Knight, Danica K; Crawley, Rachel D; Joe, George W; Flynn, Patrick M

    2015-03-01

    Success in substance abuse treatment is improved by problem recognition, desire to seek help, and readiness to engage in treatment, all of which are important aspects of motivation. Interventions that facilitate these at treatment induction for adolescents are especially needed. The purpose of this study is to assess the effectiveness of TRIP (Treatment Readiness and Induction Program) in promoting treatment motivation. Data represent 519 adolescents from 6 residential programs who completed assessments at treatment intake (time 1) and 35 days after admission (time 2). The design consisted of a comparison sample (n=281) that had enrolled in treatment prior to implementation of TRIP (standard operating practice) and a sample of clients that had entered treatment after TRIP began and received standard operating practice enhanced by TRIP (n=238). Repeated measures ANCOVAs were conducted using each time 2 motivation scale as a dependent measure. Motivation scales were conceptualized as representing sequential stages of change. LISREL was used to test a structural model involving TRIP participation, gender, drug use severity, juvenile justice involvement, age, race-ethnicity, prior treatment, and urgency as predictors of the stages of treatment motivation. Compared to standard practice, adolescents receiving TRIP demonstrated greater gains in problem recognition, even after controlling for the other variables in the model. The model fit was adequate, with TRIP directly affecting problem recognition and indirectly affecting later stages of change (desire for help and treatment readiness). Future studies should examine which specific components of TRIP affect change in motivation. Copyright © 2015 Elsevier Inc. All rights reserved.

  4. When are nursing students on clinical placements ready to expand their learning repertoire?

    DEFF Research Database (Denmark)

    Holmberg, Marlene; Stisen, Bente Kjærgaard; Grau, Sarah M.

    2018-01-01

    Learning styles indicate an individual’s preferred way of learning. Research suggests that it is important for students on clinical placements to begin the learning process with the preferred learning style and subsequently develop their ability to use other styles and become more balanced learners....... What is unknown is when baccalaureate nursing students are ready to develop the other learning styles, and what facilitates such an expansion in their learning style repertoire? This is important, because students need to develop the abilities to learn both by acting and by deepen their knowledge...... of theory to meet the requirements of the nursing profession. An American study found that operating room students felt confident to adopt new learning styles by the third week of clinical placements. No studies to date have retrieved a similar pattern of readiness to expand learning style repertoire among...

  5. Birth preparedness and complication readiness among pregnant women in Tehulederie district, Northeast Ethiopia: a community-based cross-sectional study.

    Science.gov (United States)

    Endeshaw, Demlie Belete; Gezie, Lema Derseh; Yeshita, Hedija Yenus

    2018-01-01

    Motherhood is a time of anticipation of joy for a woman, her family, and her community. In spite of this fact, it is not as enjoyable as it should be because of numerous reasons. Insufficiency or lack of birth preparedness and complication readiness is the most common reason. The aim of this study was to assess the practice of birth preparedness and complication readiness and associated factors among pregnant women in Tehuledere district, northeast Ethiopia. A community-based cross-sectional study was conducted in Tehuledere district, northeast Ethiopia. Participants were selected using the multistage sampling technique, and data were analyzed both descriptively and analytically using the binary logistic regression. Out of the total 507 samples, 500 (response rate 98.6%) pregnant women participated in the study. Less than half (44.6%) and (43.4%) of the respondents had knowledge and practice on birth preparedness and complication readiness, respectively. In the multivariate analysis, knowledge of birth preparedness and complication readiness (AOR = 1.648, 95%CI: 1.073, 2.531), knowledge of danger signs during pregnancy (AOR = 2.802, 95% CI: 1.637, 4.793), gestational age (AOR = 3.379, 95% CI: 2.114, 5.401), and antenatal care follow up starting time (AOR = 2.841, 95% CI: 1.330, 6.068) were significantly associated with the practice of birth preparedness and complication readiness, but pregnant women in rural areas (AOR = 0.442, 95% CI:0.244, 0.803) were less associated with birth preparedness and complication readiness compared to women in urban settlements. This study identified that poor knowledge, inadequate birth preparedness, and complication readiness were prevalent among mothers in the study area. Government officials, partners, and health care providers working in the areas of maternal and child health should operate together to maximize birth preparedness and complication readiness practices.

  6. A review of healthy condition for reactor operators of NPP

    International Nuclear Information System (INIS)

    Zhang Chi; Yang Di; Zhu Lixin; Zhou Limin

    2008-01-01

    Physical health is one of fundamental elements and the necessary qualification for holding operator license or senior operator license of a nuclear power plant issued by NNSA. Based upon requirements for healthy qualification of reactor operators in nuclear safety regulations and some new issued regulations, especially some involved national standard (GB), review direction, relevant contents and criteria were described, and some suggestions were provided in this paper. (authors)

  7. Fire protection system operating experience review for fusion applications

    International Nuclear Information System (INIS)

    Cadwallader, L.C.

    1995-12-01

    This report presents a review of fire protection system operating experiences from particle accelerator, fusion experiment, and other applications. Safety relevant operating experiences and accident information are discussed. Quantitative order-of-magnitude estimates of fire protection system component failure rates and fire accident initiating event frequencies are presented for use in risk assessment, reliability, and availability studies. Safety concerns with these systems are discussed, including spurious operation. This information should be useful to fusion system designers and safety analysts, such as the team working on the Engineering Design Activities for the International Thermonuclear Experimental Reactor

  8. Fire protection system operating experience review for fusion applications

    Energy Technology Data Exchange (ETDEWEB)

    Cadwallader, L.C.

    1995-12-01

    This report presents a review of fire protection system operating experiences from particle accelerator, fusion experiment, and other applications. Safety relevant operating experiences and accident information are discussed. Quantitative order-of-magnitude estimates of fire protection system component failure rates and fire accident initiating event frequencies are presented for use in risk assessment, reliability, and availability studies. Safety concerns with these systems are discussed, including spurious operation. This information should be useful to fusion system designers and safety analysts, such as the team working on the Engineering Design Activities for the International Thermonuclear Experimental Reactor.

  9. Operability design review of prototype large breeder reactor (PLBR) designs. Final report, September 1981

    International Nuclear Information System (INIS)

    Beakes, J.H.; Ehman, J.R.; Jones, H.M.; Kinne, B.V.T.; Price, C.M.; Shores, S.P.; Welch, J.K.

    1981-09-01

    Prototype Large Breeder Reactor (PLBR) designs were reviewed by personnel with extensive power plant operations experience. Fourteen normal and off-normal events, such as startup, shutdown, refueling, reactor scram and loss of feedwater, were evaluated using an operational evaluation methodology which is designed to facilitate talk-through sessions on operational events. Human factors engineers participated in the review and assisted in developing and refining the review methodologies. Operating experience at breeder reactor facilities such as Experimental Breeder Reactor-II (EBR-II), Enrico Fermi Atomic Power Plant - Unit 1, and the Fast Flux Test Facility (FFTF) was gathered, analyzed, and used to determine whether lessons learned from operational experience had been incorporated into the PLBR designs. This eighteen month effort resulted in approximately one hundred specific recommendations for improving the operability of PLBR designs

  10. The utility of single-item readiness screeners in middle school.

    Science.gov (United States)

    Lewis, Crystal G; Herman, Keith C; Huang, Francis L; Stormont, Melissa; Grossman, Caroline; Eddy, Colleen; Reinke, Wendy M

    2017-10-01

    This study examined the benefit of utilizing one-item academic and one-item behavior readiness teacher-rated screeners at the beginning of the school year to predict end-of-school year outcomes for middle school students. The Middle School Academic and Behavior Readiness (M-ABR) screeners were developed to provide an efficient and effective way to assess readiness in students. Participants included 889 students in 62 middle school classrooms in an urban Missouri school district. Concurrent validity with the M-ABR items and other indicators of readiness in the fall were evaluated using Pearson product-moment correlation coefficients, with the academic readiness item having medium to strong correlations with other baseline academic indicators (r=±0.56 to 0.91) and the behavior readiness item having low to strong correlations with baseline behavior items (r=±0.20 to 0.79). Next, the predictive validity of the M-ABR items was analyzed with hierarchical linear regressions using end-of-year outcomes as the dependent variable. The academic and behavior readiness items demonstrated adequate validity for all outcomes with moderate effects (β=±0.31 to 0.73 for academic outcomes and β=±0.24 to 0.59 for behavioral outcomes) after controlling for baseline demographics. Even after controlling for baseline scores, the M-ABR items predicted unique variance in almost all outcome variables. Four conditional probability indices were calculated to obtain an optimal cut score, to determine ready vs. not ready, for both single-item M-ABR scales. The cut point of "fair" yielded the most acceptable values for the indices. The odd ratios (OR) of experiencing negative outcomes given a "fair" or lower readiness rating (2 or below on the M-ABR screeners) at the beginning of the year were significant and strong for all outcomes (OR=2.29 to OR=14.46), except for internalizing problems. These findings suggest promise for using single readiness items to screen for varying negative end

  11. SPECTR System Operational Test Report

    International Nuclear Information System (INIS)

    Landman, W.H. Jr.

    2011-01-01

    This report overviews installation of the Small Pressure Cycling Test Rig (SPECTR) and documents the system operational testing performed to demonstrate that it meets the requirements for operations. The system operational testing involved operation of the furnace system to the design conditions and demonstration of the test article gas supply system using a simulated test article. The furnace and test article systems were demonstrated to meet the design requirements for the Next Generation Nuclear Plant. Therefore, the system is deemed acceptable and is ready for actual test article testing.

  12. Regulatory strategy and status for the Y2K readiness program of the nuclear power plants

    International Nuclear Information System (INIS)

    Jeong, Choong Heui; Ji, Seong Hyon; Oh, Soung Hun; Shin, Won Ki

    1999-01-01

    KINS established a Regulatory Strategy for Y2K Readiness Program of the Nuclear Power Plants in May 1998. On July 29, 1998, the Regulatory Action was enforced on licensees to setup the Y2K Readiness Program and report the stepwise Implementation Results of the Program. KEPCO established the Y2K Readiness Program and finished the Detailed Assessment following the Program. The Assessment showed that 108 out of 726 assets are Non-Compliant. KINS has performed the evaluation for Initial and Detailed Assessment Reports and the site audit for the Wolsong Site Division. Through those regulatory activities, we have gotten much assurance that no Y2K problem will impact on safety-related systems. And considering the progress forwarded by the licensee, we expect that all Y2K issues can be resolved before July 1999. However, to obtain the perfect assurance of the safety against the challenge of Year 2000, we will perform a thorough Audit for Validation Tests at Sites, perform a proper review for the major issues, and complete an in-depth evaluation of Submittals including Contingency Plan

  13. Consumers' health-related motive orientations and ready meal consumption behaviour.

    Science.gov (United States)

    Geeroms, Nele; Verbeke, Wim; Van Kenhove, Patrick

    2008-11-01

    Based on a multidimensional perspective on the meaning of health, this study explores associations between consumers' health-related motive orientations (HRMO) and ready meal consumption behaviour. Cross-sectional data were collected from a sample of 1934 Flemish consumers through an on-line survey. The respondents rated 45 health statements referring to people's motives for pursuing health. The survey also assessed information on several aspects of ready meal consumption, i.e. consumption frequency, beliefs and attitudes toward ready meals and ready meal buying criteria. Based on a two-step cluster analysis, we identified five distinct subgroups in the sample, according to their HRMO: health is about energy (Energetic Experimenters), emotional well-being/enjoying life (Harmonious Enjoyers), social responsibility/physical well-being (Normative Carers), achievement/outward appearance (Conscious Experts) and autonomy (Rationalists). Ready meal consumption patterns differed between these segments, with Energetic Experimenters and Conscious Experts showing significantly more positive attitudes, stronger beliefs and both higher penetration and consumption frequency related to ready meals, compared to Harmonious Enjoyers, Normative Carers and Rationalists. These findings may relate to the individualistic versus altruistic health orientation perspective of the identified segments, and are valuable in the context of improving consumer-oriented product development, positioning and marketing of ready meals.

  14. DOD Financial Management: Improvement Needed in DOD Components’ Implementation of Audit Readiness Effort

    Science.gov (United States)

    2011-09-01

    DOD Financial Management Abbreviations AFB Air Force Base COSO Committee of Sponsoring Organizations of the Treadway... Management and mismanagement.11 All of DOD’s programs on GAO’s High- Risk List relate to its business operations, including systems and processes... Management maintains audit readiness through risk -based periodic testing of internal controls utilizing the OMB Circular No. A-123, Appendix A

  15. Operational stressors on physical performance in special operators and countermeasures to improve performance: a review of the literature.

    Science.gov (United States)

    O'Hara, Reginald; Henry, Amy; Serres, Jennifer; Russell, Dawn; Locke, Robert

    2014-01-01

    Military training in elite warfighters (e.g., U.S. Army Rangers, Navy SEALs, and U.S. Air Force Battlefield Airmen) is challenging and requires mental and physical capabilities that are akin to that of professional athletes. However, unlike professional athletes, the competitive arena is the battlefield, with winning and losing replaced by either life or death. The rigors of both physical training and prolonged deployments without adequate rest and food intake can compromise physical performance. Therefore, the primary purpose of this effort was to identify occupational stressors on the physical performance of Special Operators during training and while on missions. The secondary purpose was to suggest specific countermeasures to reduce or prevent significant decrements in physical performance and reduce musculoskeletal injuries. A search of the literature for 2000?2012 was performed using the Air Force Institute of Technology search engines (i.e., PubMed and ProQuest). There were 29 articles located and selected that specifically addressed the primary and secondary purposes of this literature review. The remaining 32 of 61 referenced articles were reviewed after initial review of the primary literature. This review indicates that operational stress (e.g., negative energy balance, high-energy expenditure, sleep deprivation, environmental extremes, heavy load carriage, etc.) associated with rigorous training and sustained operations negatively affects hormonal levels, lean muscle mass, and physical performance of Special Operators. The number of musculoskeletal injuries also increases as a result of these stressors. Commanders may use simple field tests to assess physical decrements before and during deployment to effectively plan for missions. Specific countermeasures for these known decrements are lacking in the scientific literature. Therefore, future researchers should focus on studying specific physical training programs, equipment, and other methods to

  16. Assessing the actions of the farm managers to execute field operations at opportune times

    DEFF Research Database (Denmark)

    Edwards, Gareth Thomas Charles; Dybro, Niels; Munkholm, Lars Juhl

    2016-01-01

    Planning agricultural operations requires an understanding of when fields are ready for operations. However determining a field's readiness is a difficult process that can involve large amounts of data and an experienced farm manager. A consequence of this is that operations are often executed when...... fields are unready, or partially unready, which can compromise results incurring environmental impacts, decreased yield and increased operational costs. In order to assess timeliness of operations' execution, a new scheme is introduced to quantify the aptitude of farm managers to plan operations. Two...... parameterise the crop model. The evaluation criteria could be used to identify farm managers who require decisional support when planning operations, or as a means of promoting the use of sustainable farming practices....

  17. Operating experience review in development of SMART MMIS

    International Nuclear Information System (INIS)

    Suh, S. M.; Jang, G. S.; Lee, J. G.; Park, G. O.; Ko, J. H.

    2004-01-01

    We have developed HFE(Human Factors Engineering) program plan for the purpose of implementing man-machine interface system in SMART plant systematically. Elements of the plan are compatible to those of NUREG-0711, Rev.1, and OER(Operating Experience Review) is one of them. The main purpose of conducting an OER as part of HFE review is to identify HFE-related safety issues. If identified, design alternatives are carefully reviewed and selected as the way of resolution for those issues. The performing model of OER is described in this paper, showing a series of works must be done to identify and resolve HFE-related issues within the scope of SMART HFE works. Then two key issues and design alternatives resolving them are presented for examples

  18. CMS Data Transfer operations after the first years of LHC collisions

    CERN Multimedia

    CERN. Geneva

    2012-01-01

    CMS experiment possesses distributed computing infrastructure and its performance heavily depends on the fast and smooth distribution of data between different CMS sites. Data must be transferred from the Tier-0 (CERN) to the Tier-1 for storing and archiving, and time and good quality are vital to avoid overflowing CERN storage buffers. At the same time, processed data has to be distributed from Tier-1 sites to all Tier-2 sites for physics analysis while MonteCarlo simulations synchronized back to Tier-1 sites for further archival. At the core of all transferring machinery is PhEDEx (Physics Experiment Data Export) data transfer system. It is very important to ensure reliable operation of the system, and the operational tasks comprise monitoring and debugging all transfer issues. Based on transfer quality information Site Readiness tool is used to create plans for resources utilization in the future. We review the operational procedures created to enforce reliable data delivery to CMS distributed sites all ov...

  19. Nurses’ perspectives on readiness of organizations for change: a comparative study

    Directory of Open Access Journals (Sweden)

    Amarneh BH

    2017-04-01

    Full Text Available Basil Hameed Amarneh Department of Psychiatric and Community Health Nursing, Faculty of Nursing, Jordan University of Science and Technology, Irbid, Jordan Purpose: The purpose of this study is to evaluate readiness for change perceived by nurses at Jordanian hospitals according to the hospital type and the gender of nurse.Background: There are misconceptions about readiness for change, and only a few health care and nursing studies about organizational readiness for change have been conducted. Nurses’ perceptions of their organizations’ readiness for change are important; they help in introducing, managing, and maintaining the change.Methods: Using a quantitative comparative research design and a validated survey, data were collected in 2010 from a convenience sample of 130 nurses from four government and three private hospitals with a response rate of 59%.Results: There are some issues in Jordanian hospitals, which show that change has to be managed well. Nurses in government hospitals and female nurses perceived their hospitals to be more ready for change, compared with those in private hospitals and male nurses.Conclusion: Government hospitals were more ready to change than private hospitals, particularly in supporting collaborative and multidisciplinary team approaches to patient care. More than male nurses, female nurses perceived that their organizations were ready to use or plan to use advanced practice nurses. One of the recommendations is a need for targeted intervention to improve readiness for change. Keywords: readiness for change, organizations, hospitals, nurses, Jordan

  20. Analysis of e-learning implementation readiness based on integrated elr model

    Science.gov (United States)

    Adiyarta, K.; Napitupulu, D.; Rahim, R.; Abdullah, D.; Setiawan, MI

    2018-04-01

    E-learning nowadays has become a requirement for institutions to support their learning activities. To adopt e-learning, an institution requires a large strategy and resources for optimal application. Unfortunately, not all institutions that have used e-learning got the desired results or expectations. This study aims to identify the extent of the level of readiness of e-learning implementation in institution X. The degree of institutional readiness will determine the success of future e-learning utilization. In addition, institutional readiness measurement are needed to evaluate the effectiveness of strategies in e-learning development. The research method used is survey with questionnaire designed based on integration of 8 best practice ELR (e-learning readiness) model. The results showed that from 13 factors of integrated ELR model being measured, there are 3 readiness factors included in the category of not ready and needs a lot of work. They are human resource (2.57), technology skill (2.38) and content factors (2.41). In general, e-learning implementation in institutions is in the category of not ready but needs some of work (3.27). Therefore, the institution should consider which factors or areas of ELR factors are considered still not ready and needs improvement in the future.

  1. Iranian Clinical Nurses' Readiness for Self-Directed Learning.

    Science.gov (United States)

    Malekian, Morteza; Ghiyasvandian, Sharzad; Cheraghi, Mohammad Ali; Hassanzadeh, Akbar

    2015-05-17

    Clinical nurses are in need of being able to adapt to the ever-changing environment of clinical settings. The prerequisite for their successful adaptation is to be lifelong learners. An approach for making nurses lifelong learners is self-directed learning. This study was undertaken to evaluate a group of Iranian clinical nurses' readiness for self-directed learning and its relationship with some of their personal characteristics. This cross-sectional descriptive study was conducted in 2014. A random sample of 314 nurses working in three hospitals affiliated to Isfahan Social Security Organization, Isfahan, Iran, was recruited to complete the Fisher's Self-directed Learning Readiness Scale. In total, 279 nurses filled the scale completely. The mean of their readiness for self-directed learning was 162.50±14.11 (120-196). The correlation of self-directed learning readiness with age, gender, marital status, and university degree was not statistically significant. Most nurses had great readiness for self-directed learning. Accordingly, nursing policy-makers need to develop strategies for promoting their self-directed learning. Moreover, innovative teaching methods such as problem solving and problem-based learning should be employed to prepare nurses for effectively managing the complexities of their ever-changing work environment.

  2. Operation Poorman

    International Nuclear Information System (INIS)

    Pruvost, N.; Tsitouras, J.

    1981-01-01

    The objectives of Operation Poorman were to design and build a portable seismic system and to set up and use this system in a cold-weather environment. The equipment design uses current technology to achieve a low-power, lightweight system that is configured into three modules. The system was deployed in Alaska during wintertime, and the results provide a basis for specifying a mission-ready seismic verification system

  3. Technology Readiness Level Guidebook

    Science.gov (United States)

    2017-09-01

    This guidebook provides the necessary information for conducting a Technology Readiness Level (TRL) Assessment. TRL Assessments are a tool for determining the maturity of technologies and identifying next steps in the research process. This guidebook...

  4. TMI-2 core-examination program: INEL facilities readiness study

    International Nuclear Information System (INIS)

    McLaughlin, T.B.

    1983-02-01

    This report reviews the capability and readiness of remote handling facilities at the Idaho National Engineering Laboratory (INEL) to receive, and store the TMI-2 core, and to examine and analyze TMI-2 core samples. To accomplish these objectives, the facilities must be able to receive commercial casks, unload canisters from the casks, store the canisters, open the canisters, handle the fuel debris and assemblies, and perform various examinations. The report identifies documentation, including core information, necessary to INEL before receiving the entire TMI-2 core. Also identified are prerequisites to INEL's receipt of the first canister: costs, schedules, and a preliminary project plan for the tasks

  5. Parent Involvement in the Getting Ready for School Intervention Is Associated With Changes in School Readiness Skills

    Directory of Open Access Journals (Sweden)

    Maria Marti

    2018-05-01

    Full Text Available The role of parent involvement in school readiness interventions is not well-understood. The Getting Ready for School (GRS intervention is a novel program that has both home and school components and aims to improve early literacy, math, and self-regulatory skills in preschool children from socioeconomically disadvantaged families. In this study, we first examined associations between family characteristics and different indices of parent involvement in the GRS intervention. We then examined associations between parent involvement and change in children's school readiness skills over time. Participants were 133 preschool children attending Head Start and their parents who participated in the GRS intervention during the academic year 2014–2015. Parent involvement was operationalized as attendance to GRS events at the school, time spent at home doing GRS activities, and usage of digital program materials, which included a set of videos to support the implementation of parent-child activities at home. Although few family characteristics were significantly associated with parent involvement indices, there was a tendency for some markers of higher socioeconomic status to be linked with greater parent involvement. In addition, greater parent involvement in the GRS intervention was significantly associated with greater gains in children's early literacy, math, and self-regulatory skills. These findings suggest that parent involvement in comprehensive early interventions could be beneficial in terms of improving school readiness for preschoolers from disadvantaged families.

  6. Parent Involvement in the Getting Ready for School Intervention Is Associated With Changes in School Readiness Skills

    Science.gov (United States)

    Marti, Maria; Merz, Emily C.; Repka, Kelsey R.; Landers, Cassie; Noble, Kimberly G.; Duch, Helena

    2018-01-01

    The role of parent involvement in school readiness interventions is not well-understood. The Getting Ready for School (GRS) intervention is a novel program that has both home and school components and aims to improve early literacy, math, and self-regulatory skills in preschool children from socioeconomically disadvantaged families. In this study, we first examined associations between family characteristics and different indices of parent involvement in the GRS intervention. We then examined associations between parent involvement and change in children's school readiness skills over time. Participants were 133 preschool children attending Head Start and their parents who participated in the GRS intervention during the academic year 2014–2015. Parent involvement was operationalized as attendance to GRS events at the school, time spent at home doing GRS activities, and usage of digital program materials, which included a set of videos to support the implementation of parent-child activities at home. Although few family characteristics were significantly associated with parent involvement indices, there was a tendency for some markers of higher socioeconomic status to be linked with greater parent involvement. In addition, greater parent involvement in the GRS intervention was significantly associated with greater gains in children's early literacy, math, and self-regulatory skills. These findings suggest that parent involvement in comprehensive early interventions could be beneficial in terms of improving school readiness for preschoolers from disadvantaged families. PMID:29904362

  7. Child Readiness to Kindergarten in Parents and Pedagogues Sight

    OpenAIRE

    POKORNÁ, Ivana

    2014-01-01

    The bachelor thesis deals with the readiness of 3-4 year old children to enter kindergarten. The theoretical part describes the biological and psychosocial development of the child aged three to four years and highlights the various factors that may affect the child's entry into kindergarten. Describes the family and kindergarten, the issue of adaptation in pre-school and readiness of the child to them. The practical part contains research focused on the perception of the readiness of childre...

  8. Television Viewing, Educational Quality of the Home Environment, and School Readiness.

    Science.gov (United States)

    Clarke, Angela Teresa; Kurtz-Costes, Beth

    1997-01-01

    Researchers examined relationships among children's television viewing, school readiness, parental employment, and the home environment's educational quality. Thirty low-income parents completed surveys. Their preschoolers completed IQ and school readiness assessments. Television viewing adversely related to school readiness and the home…

  9. 75 FR 28594 - Ready-to-Learn Television Program

    Science.gov (United States)

    2010-05-21

    ... DEPARTMENT OF EDUCATION [CFDA Number 84.295A] Ready-to-Learn Television Program AGENCY: Office of Innovation and Improvement, Department of Education. ACTION: Notice inviting applications for new awards for... INFORMATION CONTACT: The Ready-to-Learn Television Program, U.S. Department of Education, 400 Maryland Avenue...

  10. Bilingual Readiness for Achieving through Valued Opportunities (Project BRAVO) Final Evaluation Report, 1992-93. OREA Report.

    Science.gov (United States)

    Choonoo, John

    This report presents an evaluation of the Bilingual Readiness for Achieving through Valued Opportunities (Project BRAVO), an Elementary and Secondary Education Act Title VII-funded project in its first year of operation at Boys and Girls High School in Brooklyn (New York) and Louis D. Brandeis High School in Manhattan (New York). Participating…

  11. Mini-Split Heat Pump Evaluation and Zero Energy Ready Home Support

    Energy Technology Data Exchange (ETDEWEB)

    Herk, Anastasia [IBACOS, Inc., Pittsburgh, PA (United States)

    2017-01-01

    IBACOS worked with builder Imagine Homes to evaluate the performance of an occupied new construction test house following construction of the house in the hot, humid climate of San Antonio, Texas. The project measures the effectiveness of a space conditioning strategy using a multihead mini-split heat pump (MSHP) system in a reduced-load home to achieve acceptable comfort levels (temperature and humidity) and energy performance. IBACOS collected long-term data and analyzed the energy consumption and comfort conditions of the occupied house after one year of operation. Although measured results indicate that the test system provides comfort both inside and outside the ASHRAE Standard 55-2010 range, the occupants of the house claimed both adequate comfort and appreciation of the ease of use and flexibility of the installed MSHP system. IBACOS also assisted the builder to evaluate design and specification changes necessary to comply with Zero Energy Ready Home, but the builder chose to not move forward with it because of concerns about the 'solar ready' requirements of the program.

  12. Are Malaysian Students Ready to Be Authors of Digital Contents? A Case Study of Digital Library Stakeholders’ Readiness

    Directory of Open Access Journals (Sweden)

    Abrizah Abdullah

    2007-09-01

    Full Text Available The paper reports on a study that ascertains the factors facilitating students to utilize digital libraries for educational purposes. The study investigates students ICT readiness, usage of online resources and information seeking behaviour of secondary school students with the specific goal of applying the results to the design of a collaborative digital library for school projects. The digital library has been conceived to support resource needs of these students as well provide the space for them to publish their school projects, which are currently submitted handwritten. The study uses the case study approach and an urban secondary school in Malaysia is chosen as the case school. Findings from a survey and focus group interviews indicate that the students are ready to collaboratively build the digital library resources as evidenced by students digital library readiness score of 31.4/40.

  13. Constellation Mission Operation Working Group: ESMO Maneuver Planning Process Review

    Science.gov (United States)

    Moyer, Eric

    2015-01-01

    The Earth Science Mission Operation (ESMO) Project created an Independent Review Board to review our Conjunction Risk evaluation process and Maneuver Planning Process to identify improvements that safely manages mission conjunction risks, maintains ground track science requirements, and minimizes overall hours expended on High Interest Events (HIE). The Review Board is evaluating the current maneuver process which requires support by multiple groups. In the past year, there have been several changes to the processes although many prior and new concerns exist. This presentation will discuss maneuver process reviews and Board comments, ESMO assessment and path foward, ESMO future plans, recent changes and concerns.

  14. Regulating Nuclear Reactor Construction and Commissioning, and Preparation for Operation – Challenges for a New Regulatory Body

    International Nuclear Information System (INIS)

    Viktorsson, C.

    2016-01-01

    Following an introduction with a description of the peaceful nuclear energy program in the United Arab Emirates (UAE) and an overview of the regulatory framework for safety, security and safeguards, this paper describes the regulatory approach for oversight of construction and the granting of an Operating Licence for the first nuclear power plant in the UAE. The paper describes the inspection programme set up by the Federal Authority for Nuclear Regulation (FANR) to verify construction and preoperational testing by the licensee. Moreover, it outlines the content of the operating licence application and focus areas for the regulatory review and assessment. Also, the paper describes the basic elements required by FANR for the decision-making regarding the issuance of the Operating Licence including integration of the results of review and assessment and the implementation of a systematic inspection programme to ensure operational readiness to operate and maintain the plant in accordance with FANR regulations. Finally, the paper addresses the preparation for regulatory oversight and the skill-set needed at FANR to ensure an effective and efficient oversight of safety, security of the nuclear energy power in the UAE. (author)

  15. 75 FR 16763 - Ready-to-Learn Television Program

    Science.gov (United States)

    2010-04-02

    ... DEPARTMENT OF EDUCATION [CFDA Number 84.295A] Ready-to-Learn Television Program AGENCY: Office of Innovation and Improvement, Department of Education. ACTION: Notice inviting applications for new awards for... FR 13515) a notice inviting applications for new awards for FY 2010 for the Ready-to-Learn Television...

  16. 75 FR 18170 - Ready-to-Learn Television Program

    Science.gov (United States)

    2010-04-09

    ... DEPARTMENT OF EDUCATION [CFDA Number 84.295A] Ready-to-Learn Television Program AGENCY: Office of Innovation and Improvement, Department of Education. ACTION: Notice inviting applications for new awards for... FR 13515) a notice inviting applications for new awards for FY 2010 for the Ready-to-Learn Television...

  17. Readiness towards Entrepreneurship Education: Students and Malaysian Universities

    Science.gov (United States)

    Othman, Norasmah; Hashim, Norashidah; Wahid, Hariyaty Ab

    2012-01-01

    Purpose: The purpose of this paper is to observe the readiness of students and the internal environment of Malaysian public universities in the implementation of entrepreneurship education. Design/methodology/approach: The authors employed a quantitative approach and the main instrument used to gauge the entrepreneurship readiness among students…

  18. Rice University: Innovation to Increase Student College Readiness

    Science.gov (United States)

    Gigliotti, Jennifer

    2012-01-01

    "College readiness" means that a student can enter a college classroom without remediation and successfully complete entry-level college requirements (Conley, 2012). In order for students to be considered college ready, they must acquire skills, content knowledge, and behaviors before leaving high school. Research on high-school performance…

  19. Replacing Remediation with Readiness. An NCPR Working Paper

    Science.gov (United States)

    Conley, David T.

    2010-01-01

    This paper critically examines traditional means of assessing college students' need for remediation and suggests as a replacement an expanded definition of college readiness, where readiness is more complex than rudimentary content knowledge and more multifaceted than a single cut point. The paper presents and explains four dimensions of…

  20. What Does It Mean to Be El Niño Ready?

    Directory of Open Access Journals (Sweden)

    Michael H. Glantz

    2018-03-01

    Full Text Available Once an El Niño event has been forecast, government warnings and news headlines highlight the need for society to get ready for the potential impacts of the event, whether drought, flood, heatwave, disease outbreak, or water shortage. The notion of readiness for a climate-, water- or weather-related hazard or disaster is a fuzzy term, subject to a wide range of conflicting perceptions. Not every government sees El Niño as a direct threat to the wellbeing of its citizens. In this paper, we conceptualize readiness and identify reasons that some governments do not as well as cannot prepare for El Niño’s foreseeable consequences. Central among those reasons are its characteristics: quasi-periodicity, event variability, difficulties with onset forecasting, and the fact that El Niño and its “teleconnections” are influenced by numerous other oceanic and atmospheric oscillations. As a result, there is no universally accepted approach to or reliable measure of readiness. The concept is often discussed qualitatively in terms of “shades of readiness”, such as hardly ready, somewhat ready, almost ready, and absolutely ready. Although El Niño is still difficult to forecast, the existing knowledge about it can provide usable information for decision makers to choose whether to pursue strategic or tactical disaster risk reduction policies.

  1. Advanced control room caters for the operator

    International Nuclear Information System (INIS)

    George, C.R.; Rygg, D.E.

    1980-01-01

    In existing control rooms the operators' efficiency is often limited by widely scattered and sometimes illogically arranged controls which tend to increase the potential for outages or equipment damage. The advanced control room described allows instant and ready access to preselected information and control by one or two operators from a seated or standing position. (author)

  2. Columbia River System Operation Review final environmental impact statement. Appendix T: Comments and responses

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. This appendix documents the public and agency review of the SOR Draft EIS and how the SOR agencies used the review to formulate the FINAL EIS. The appendix includes a summary of the review process, a discussion of the nature of the comments, a list of all commentors, reproductions of comment letters, and responses to all comments. Changes in the EIS text in response to comments are noted in the responses

  3. Cryogenic system operating experience review for fusion applications

    International Nuclear Information System (INIS)

    Cadwallader, L.C.

    1992-01-01

    This report presents a review of cryogenic system operating experiences, from particle accelerator, fusion experiment, space research, and other applications. Safety relevant operating experiences and accident information are discussed. Quantitative order-of-magnitude estimates of cryogenic component failure rates and accident initiating event frequencies are presented for use in risk assessment, reliability, and availability studies. Safety concerns with cryogenic systems are discussed, including ozone formation, effects of spills, and modeling spill behavior. This information should be useful to fusion system designers and safety analysts, such as the team working on the International Thermonuclear Experimental Reactor design

  4. Operating System Concepts for Reconfigurable Computing: Review and Survey

    OpenAIRE

    Marcel Eckert; Dominik Meyer; Jan Haase; Bernd Klauer

    2016-01-01

    One of the key future challenges for reconfigurable computing is to enable higher design productivity and a more easy way to use reconfigurable computing systems for users that are unfamiliar with the underlying concepts. One way of doing this is to provide standardization and abstraction, usually supported and enforced by an operating system. This article gives historical review and a summary on ideas and key concepts to include reconfigurable computing aspects in operating systems. The arti...

  5. Promoting community readiness for physical activity among older adults in Germany--protocol of the ready to change intervention trial.

    Science.gov (United States)

    Brand, Tilman; Gansefort, Dirk; Rothgang, Heinz; Röseler, Sabine; Meyer, Jochen; Zeeb, Hajo

    2016-02-01

    Healthy ageing is an important concern for many societies facing the challenge of an ageing population. Physical activity (PA) is a major contributor to healthy ageing; however insufficient PA levels are prevalent in old age in Germany. Community capacity building and community involvement are often recommended as key strategies to improve equitable access to prevention and health promotion. However, evidence for the effectiveness of these strategies is scarce. This study aims to assess the community readiness for PA promotion in local environments and to analyse the utility of strategies to increase community readiness for reaching vulnerable groups. We designed a mixed method intervention trial comprising three study modules. The first module includes an assessment of community readiness for PA interventions in older adults. The assessment is carried out in a sample of 24 municipalities in the Northwest of Germany using structured key informant interviews. In the second module, eight municipalities with the low community readiness are selected from the sample and randomly assigned to one of two study groups: active enhancement of community readiness (intervention) versus no enhancement (control). After enhancing community readiness in the active enhancement group, older adults in both study groups will be recruited for participation in a PA intervention. Participation rates are compared between the study groups to evaluate the effects of the intervention. In addition, a cost-effectiveness analysis is carried out calculating recruitment costs per person reached in the two study groups. In the third module, qualitative interviews are conducted with participants and non-participants of the PA intervention exploring reasons for participation or non-participation. This study offers the potential to contribute to the evidence base of reaching vulnerable older adults for PA interventions and provide ideas on how to reduce participation barriers. Its findings will inform

  6. Effect of an Individual Readiness Assurance Test on a Team Readiness Assurance Test in the Team-Based Learning of Physiology

    Science.gov (United States)

    Gopalan, Chaya; Fox, Dainielle J.; Gaebelein, Claude J.

    2013-01-01

    We examined whether requiring an individual readiness assurance test (iRAT) before a team readiness assurance test (tRAT) would benefit students in becoming better problem solvers in physiology. It was tested in the form of tRAT scores, the time required to complete the tRAT assignment, and individual performance on the unit examinations. Students…

  7. Tritium Room Air Monitor Operating Experience Review

    Energy Technology Data Exchange (ETDEWEB)

    L. C. Cadwallader; B. J. Denny

    2008-09-01

    Monitoring the breathing air in tritium facility rooms for airborne tritium is a radiological safety requirement and a best practice for personnel safety. Besides audible alarms for room evacuation, these monitors often send signals for process shutdown, ventilation isolation, and cleanup system actuation to mitigate releases and prevent tritium spread to the environment. Therefore, these monitors are important not only to personnel safety but also to public safety and environmental protection. This paper presents an operating experience review of tritium monitor performance on demand during small (1 mCi to 1 Ci) operational releases, and intentional airborne inroom tritium release tests. The tritium tests provide monitor operation data to allow calculation of a statistical estimate for the reliability of monitors annunciating in actual tritium gas airborne release situations. The data show a failure to operate rate of 3.5E-06/monitor-hr with an upper bound of 4.7E-06, a failure to alarm on demand rate of 1.4E-02/demand with an upper bound of 4.4E-02, and a spurious alarm rate of 0.1 to 0.2/monitor-yr.

  8. Effects of Ready-to-Eat-Cereals on Key Nutritional and Health Outcomes: A Systematic Review.

    Science.gov (United States)

    Priebe, Marion G; McMonagle, Jolene R

    2016-01-01

    In many countries breakfast cereals are an important component of breakfast. This systematic review assesses the contribution of consumption of ready-to eat cereal (RTEC) to the recommended nutrient intake. Furthermore, the effects of RTEC consumption on key health parameters are investigated as well as health promoting properties of RTEC. The Cochrane Central Register of Controlled Trials, MEDLINE, EMBASE and CINAHL have been searched up till 16th of June 2015. Randomized controlled trials were excluded if RTEC were used during hypocaloric diets, if RTEC were eaten at other times than breakfast and if breakfasts included other products than RTEC, milk and fruit. Observational studies were excluded when "breakfast cereals" were not defined or their definition included cooked cereals. From cross-sectional studies only data concerning energy and nutrient intake as well as micronutrient status were used. From 4727 identified citations 64 publications met the inclusion criteria of which 32 were cross-sectional studies, eight prospective studies and 24 randomized controlled trials. Consumption of RTEC is associated with a healthier dietary pattern, concerning intake of carbohydrates, dietary fiber, fat and micronutrients, however total sugar intake is higher. Persons consuming RTEC frequently (≥ 5 times/week) have a lower risk of inadequate micronutrient intake especially for vitamin A, calcium, folate, vitamin B 6, magnesium and zinc. Evidence from prospective studies suggests that whole grain RTEC may have beneficial effects on hypertension and type 2 diabetes. Consumption of RTEC with soluble fiber helps to reduce LDL cholesterol in hypercholesterolemic men and RTEC fortified with folate can reduce plasma homocysteine. One of the review's strengths is its thorough ex/inclusion of studies. Limitations are that results of observational studies were based on self-reported data and that many studies were funded by food-industry. Consumption of RTEC, especially of fiber

  9. 40 CFR 26.1603 - Operation of the Human Studies Review Board.

    Science.gov (United States)

    2010-07-01

    ... appropriate for the scientific and ethical review of human research, including research ethics, biostatistics... scientific and ethical aspects of research proposals and reports of completed research with human subjects... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Operation of the Human Studies Review...

  10. A practical implementation science heuristic for organizational readiness: R = MC2

    Science.gov (United States)

    Cook, Brittany S.; Lamont, Andrea; Wandersman, Abraham; Castellow, Jennifer; Katz, Jason; Beidas, Rinad S.

    2015-01-01

    There are many challenges when an innovation (i.e., a program, process, or policy that is new to an organization) is actively introduced into an organization. One critical component for successful implementation is the organization’s readiness for the innovation. In this article, we propose a practical implementation science heuristic, abbreviated as R= MC2. We propose that organizational readiness involves: 1) the motivation to implement an innovation, 2) the general capacities of an organization, and 3) the innovation-specific capacities needed for a particular innovation. Each of these components can be assessed independently and be used formatively. The heuristic can be used by organizations to assess readiness to implement and by training and technical assistance providers to help build organizational readiness. We present an illustration of the heuristic by showing how behavioral health organizations differ in readiness to implement a peer specialist initiative. Implications for research and practice of organizational readiness are discussed. PMID:26668443

  11. e-Learning readiness amongst nursing students at the Durban ...

    African Journals Online (AJOL)

    e-Learning readiness amongst nursing students at the Durban University of ... make the shift from traditional learning to the technological culture of e-Learning at a ... equipment and technological readiness for the change in learning method.

  12. University Research Initiative Program for Combat Readiness

    Science.gov (United States)

    1999-05-01

    microscope image of one of the lenses. This array was selected for testing because it is fabricated in a relatively inexpensive polyacrylic material, the...potent analogues of the potassium -sparing diuretic, amiloride. However, our results 179 University Reasearch Initiative for Combat Readiness Annual Report...for Combat Readiness Annual Report for the period June 1, 1998 - June 30, 1999 Roger H. Sawyer University of South Carolina Columbia, SC 29208 May

  13. Designing and Assessing the Validity and Reliability of the Hospital Readiness Assessment Tools to Conducting Quality Improvement Program

    Directory of Open Access Journals (Sweden)

    Kamal Gholipoor

    2016-09-01

    Full Text Available Background and objectives : Identifying the readiness of hospital and its strengths and weaknesses can be useful in developing appropriate planning and situation analyses and management to getting effective in clinical audit programs. The aim of this study was to design and assess the validity of the Hospital Readiness Assessment Tools to conduct quality improvement and clinical audit programs. Material and Methods: In this study, based on the results of a systematic review of literature, an initial questionnaire with 77 items was designed. Questionnaire content validity was reviewed by experts in the field of hospital management and quality improvement in Tabriz University of Medical Sciences. For this purpose, 20 questionnaires were sent to experts. Finally, 15 participants returned completed questionnaire. Questionnaire validity was reviewed and confirmed based on Content Validity Index and Content Validity Ratio. Questionnaire reliability was confirmed based on Cronbach's alpha index (α = 0.96 in a pilot study by participation of 30 hospital managers. Results: The results showed that the final questionnaire contains 54 questions as nine category as: data and information (9 items, teamwork (12 questions, resources (5 questions, patient and education (5, intervention design and implementation (5 questions, clinical audit management (4 questions, human resources (6 questions, evidence and standard (4 items and evaluation and feedback (4 items. The final questionnaire content validity index was 0.91 and final questionnaire Cronbach's alpha coefficient was 0.96. Conclusion: Considering the relative good validity and reliability of the designed tool in this study, it appears that the questionnaire can be used to identify and assess the readiness of hospitals for quality improvement and clinical audit program implementation

  14. NHI Component Technical Readiness Evaluation System

    International Nuclear Information System (INIS)

    Sherman, S.; Wilson, Dane F.; Pawel, Steven J.

    2007-01-01

    A decision process for evaluating the technical readiness or maturity of components (i.e., heat exchangers, chemical reactors, valves, etc.) for use by the U.S. DOE Nuclear Hydrogen Initiative is described. This system is used by the DOE NHI to assess individual components in relation to their readiness for pilot-scale and larger-scale deployment and to drive the research and development work needed to attain technical maturity. A description of the evaluation system is provided, and examples are given to illustrate how it is used to assist in component R and D decisions.

  15. Ready to regulate small reactors in Canada

    Energy Technology Data Exchange (ETDEWEB)

    Herstead, S.; Cook, S.; De Vos, M.; Howden, B.D. [Canadian Nuclear Safety Commission, Ottawa, Ontario (Canada)

    2012-07-01

    The success of any new build project is reliant upon all stakeholders - applicants, vendors, contractors and regulatory agencies - being ready to do their part. Over the past several years, the Canadian Nuclear Safety Commission (CNSC) has been working to ensure that it has the appropriate regulatory framework and internal processes in place for the timely and efficient licensing of all types of reactor, regardless of size. The CNSC's general nuclear safety objective requires that nuclear facilities be designed and operated in a manner that will protect the health, safety and security of persons and the environment from unreasonable risk, and to implement Canada's international commitments on the peaceful use of nuclear energy. For smaller facilities, this has traditionally allowed for the use of a graded approach to achieving safety.

  16. Is clinical virtual reality ready for primetime?

    Science.gov (United States)

    Rizzo, Albert Skip; Koenig, Sebastian Thomas

    2017-11-01

    Since the mid-1990s, a significant scientific literature has evolved regarding the outcomes from the use of what we now refer to as clinical virtual reality (VR). This use of VR simulation technology has produced encouraging results when applied to address cognitive, psychological, motor, and functional impairments across a wide range of clinical health conditions. This article addresses the question, "Is clinical VR ready for primetime?" After a brief description of the various forms of VR technology, we discuss the trajectory of clinical VR over the last 20 years and summarize the basic assets that VR offers for creating clinical applications. The discussion then addresses the question of readiness in terms of the theoretical basis for clinical VR assets, the research to date, the pragmatic factors regarding availability, usability, and costs of clinical VR content/systems, and the ethical issues for the safe use of VR with clinical populations. Our review of the theoretical underpinnings and research findings to date leads to the prediction that clinical VR will have a significant impact on future research and practice. Pragmatic issues that can influence adoption across many areas of psychology also appear favorable, but professional guidelines will be needed to promote its safe and ethical use. Although there is still much research needed to advance the science in this area, we strongly believe that clinical VR applications will become indispensable tools in the toolbox of psychological researchers and practitioners and will only grow in relevance and popularity in the future. (PsycINFO Database Record (c) 2018 APA, all rights reserved).

  17. Radioactive Operations Committee Review of the Intermediate-Level Waste Evaporator Facility, Building 2531 February 17, 1972

    International Nuclear Information System (INIS)

    Liberman, B.; Brooksbank, R.E.

    1972-01-01

    A subcommittee of the Radioactive Operations Committee met with the Operators of the Intermediate Level Waste Evaporator Facility on February 17, 1972, to discuss the status of the facility and its operations since the review of October 7, 1970, and reported in ORNL-CF-70-11-12. This review was made to determine the status of the ILWEF since the last review, to discuss compliance with previously recommended changes, and to review any new items of safety significance. Several recommendations were made.

  18. Reviewing operational experience feedback

    International Nuclear Information System (INIS)

    1991-04-01

    The purpose of this document is to provide detailed supplementary guidance to OSART experts to aid in the evaluation of operational experience feedback (OEF) programmes at nuclear power plants. The document begins by describing the objectives of an OEF programme. It goes on to indicate preparatory work and investigatory guidance for the expert. Section 5 describes attributes of an excellent OEF programme. Appended to these guidelines are examples of OEF documents from various plants. These are intended to help the expert by demonstrating the actual implementation of OEF in practice. These guidelines are in no way intended to conflict with existing national regulations and rules. A comprehensive OEF programme, as described in Section 2, would be impossible to evaluated in detail in the amount of time typically allocated for assessing OEF in an OSART review. The expert must use his or her time wisely by concentrating on those areas that appear to be the weakest

  19. Recovery Audit Contractor medical necessity readiness: one health system's journey.

    Science.gov (United States)

    Scott, Judith A; Camden, Mindy

    2011-01-01

    To develop a sustainable approach to Recovery Audit Contractor medical necessity readiness that mitigates the regulatory and financial risks of the organization. Acute care hospitals. Utilizing the model for improvement and plan-do-study-act methodology, this health system designed and implemented a medical necessity case management program. We focused on 3 areas for improvement: medical necessity review accuracy, review timeliness, and physician adviser participation for secondary reviews. Over several months, we improved accuracy and timeliness of our medical necessity reviews while also generating additional inpatient revenue for the health system. We successfully enhanced regulatory compliance and reduced our financial risks associated with Recovery Audit Contractor medical necessity audits. A successful medical necessity case management program can not only enhance regulatory compliance and reduce the amount of payments recouped by Medicare, but also generate additional inpatient revenue for your organization. With health care reform and accountable care organizations on the horizon, hospitals must find ways to protect and enhance revenue in order to carry out their missions. This is one way for case managers to help in that cause, to advocate for the care of their patients, and to bring value to the organization.

  20. From initial application to routine operation: Reviewing the Applications for Power Uprates

    International Nuclear Information System (INIS)

    Garis, Ninos; Skaanberg, Lars

    2007-01-01

    Current plans for power uprates in Swedish nuclear power plants will lead to significant increases in seven units and a lesser increase in one unit. To date SKI has received six applications, and two more are due in 2007. A power uprate process is initiated by the application to the Government by a licensee for approval to increase the thermal output of a reactor unit. This request is addressed to the Government and is forwarded to SKI for a preliminary safety review. The result of the review is then provided by SKI as a basis for a governmental decision. Six applications have been taken through the first stage of the process; of these, three have received governmental approval and three are currently awaiting a decision. If the licensee's application is approved by the Government, deeper analyses and studies are required in order to modify the plant and update the safety analysis report and the associated technical specifications. SKI reviews this material on a continuous basis prior to test and routine operation at the increased power level. There are four stages that require attention and review by SKI; 1. Review of the application to the Government for approval to operate at increased power levels, and preparation of a suitable answer. 2. Review and approval of the preliminary safety analysis report (PSAR) 3. Review and approval of the application for testing at the higher power level 4. Review and approval of routine operation at the higher power level. A thorough description of the handling of a power uprate process can be found in the SKI PM (SKI-PM 04:11) that is available on the SKI website (in Swedish)

  1. Community Readiness Within Systems of Care: The Validity and Reliability of the System of Care Readiness and Implementation Measurement Scale (SOC-RIMS).

    Science.gov (United States)

    Rosas, Scott R; Behar, Lenore B; Hydaker, William M

    2016-01-01

    Establishing a system of care requires communities to identify ways to successfully implement strategies and support positive outcomes for children and their families. Such community transformation is complex and communities vary in terms of their readiness for implementing sustainable community interventions. Assessing community readiness and guiding implementation, specifically for the funded communities implementing a system of care, requires a well-designed tool with sound psychometric properties. This scale development study used the results of a previously published concept mapping study to create, administer, and assess the psychometric characteristics of the System of Care Readiness and Implementation Measurement Scale (SOC-RIMS). The results indicate the SOC-RIMS possesses excellent internal consistency characteristics, measures clearly discernible dimensions of community readiness, and demonstrates the target constructs exist within a broad network of content. The SOC-RIMS can be a useful part of a comprehensive assessment in communities where system of care practices, principles, and philosophies are implemented and evaluated.

  2. Advanced launch system (ALS) - Electrical actuation and power systems improve operability and cost picture

    Science.gov (United States)

    Sundberg, Gale R.

    1990-01-01

    To obtain the Advanced Launch System (ALS) primary goals of reduced costs and improved operability, there must be significant reductions in the launch operations and servicing requirements relative to current vehicle designs and practices. One of the primary methods for achieving these goals is by using vehicle electrrical power system and controls for all aviation and avionics requirements. A brief status review of the ALS and its associated Advanced Development Program is presented to demonstrate maturation of those technologies that will help meet the overall operability and cost goals. The electric power and actuation systems are highlighted as a sdpecific technology ready not only to meet the stringent ALS goals (cryogenic field valves and thrust vector controls with peak power demands to 75 hp), but also those of other launch vehicles, military ans civilian aircraft, lunar/Martian vehicles, and a multitude of comercial applications.

  3. Advanced Launch System (ALS): Electrical actuation and power systems improve operability and cost picture

    Science.gov (United States)

    Sundberg, Gale R.

    1990-01-01

    To obtain the Advanced Launch System (ALS) primary goals of reduced costs and improved operability, there must be significant reductions in the launch operations and servicing requirements relative to current vehicle designs and practices. One of the primary methods for achieving these goals is by using vehicle electrical power system and controls for all actuation and avionics requirements. A brief status review of the ALS and its associated Advanced Development Program is presented to demonstrate maturation of those technologies that will help meet the overall operability and cost goals. The electric power and actuation systems are highlighted as a specific technology ready not only to meet the stringent ALS goals (cryogenic field valves and thrust vector controls with peak power demands to 75 hp), but also those of other launch vehicles, military and civilian aircraft, lunar/Martian vehicles, and a multitude of commercial applications.

  4. TMI-2 core-examination program: INEL facilities-readiness study

    International Nuclear Information System (INIS)

    McLaughlin, T.B.

    1982-09-01

    This document is a review of the Idaho National Engineering Laboratory's (INEL) remote handling facilities. Their availability and readiness to conduct examination and analyses of TMI-2 core samples was determined. Examination of these samples require that the facilities be capable of receiving commercial casks, unloading canisters from the casks, opening the canisters, handling the fuel debris and assemblies, and performing various examinations. The documentation that was necessary for the INEL to have before the receipt of the core material was identified. The core information was also required for input to these documents. The costs, schedules, and a preliminary-project plan are presented for the tasks which are identified as prerequisites to the receipt of the first core sample

  5. Review on Islanding Operation of Distribution System with Distributed Generation

    DEFF Research Database (Denmark)

    Mahat, Pukar; Chen, Zhe; Bak-Jensen, Birgitte

    2011-01-01

    The growing environmental concern and various benefits of distributed generation (DG) have resulted in significant penetration of DG in many distribution systems worldwide. One of the major expected benefits of DG is the improvement in the reliability of power supply by supplying load during power...... outage by operating in an island mode. However, there are many challenges to overcome before islanding operation of a distribution system with DG can become a viable solution in future. This paper reviews some of the major challenges with islanding operation and explores some possible solutions...

  6. A Practical Review of Studies on Operator's Supervisory Monitoring Behavior

    International Nuclear Information System (INIS)

    Ha, Jun Su; Seong, Poong Hyun

    2009-01-01

    Correct situation awareness (SA) has been considered a crucial key to improving performance and reducing error in NPPs. There are a lot of information sources that should be monitored in NPPs, but operators have only limited capacity of attention and memory. Operators in NPPs selectively attend to important information sources to effectively develop SA when an abnormal or accidental situation occurs. Selective attention to important information sources is continued while maintaining SA as well. In this work, various models of operator's visual sampling behavior are reviewed for the use in human factors studies in NPPs

  7. Solid scintillator 'Ready Cap' for measurement with a liquid scintillation counter

    International Nuclear Information System (INIS)

    Ijiri, Kenichi; Endo, Masashi; Nogawa, Norio; Tsuda, Shoko; Nakamura, Aiko; Morikawa, Naotake; Osaki, Susumu.

    1990-01-01

    'Ready Cap', a small plastic container coated with solid scintillator has recently been introduced (Beckman Instruments, Inc.). Pulse height spectra and counting efficiencies obtained with a liquid scintillator and Ready Cap using a liquid scintillation counter were compared for 15 different radionuclides. For radionuclides emitting low-energy β-rays or characteristic X-rays, the spectra for Ready Cap shifted toward the higher energy side compared with the spectra for the liquid scintillator. This tendency was reversed for the nuclides emitting higher-energy β-radiations ( 36 Cl and 32 P). Generally, counting efficiencies both in Ready Cap and in liquid scintillator increased with increase in the energy of β- or X-rays. For some nuclides, Ready Cap gave higher counting efficiencies and for others it gave lower values than in the liquid scintillator. However, the differences were not large within each nuclide. The use of Ready Cap is recommended for measurements of radionuclides when liquid scintillation cocktails have no means of waste disposal under the present Japanese radioisotope regulation. (author)

  8. Research on Influencing Factors of Salespeople's Empowerment Readiness in Green Energy Enterprise

    Science.gov (United States)

    Dong, Yuan; Liu, Xiaohui

    As market competition in green energy enterprises continues to intensify, marketing activities are enlarging and customer demand is increasingly growing and diversifying. More and more green energy enterprises have empowered their own salespeople. And managers in green energy enterprises are more concerned with the issues which employees suit to be empowered and which factors will influence employee empowerment readiness. This paper proposes the definition of salespeople's empowerment readiness, analyzes influencing factors of salespeople's empowerment readiness, discusses the effect mechanism of influencing factors of salespeople's empowerment readiness, finally, and puts forward some suggestions to enhance salespeople's empowerment readiness from the perspective of human resource management practice.

  9. The WIPP transportation system: Demonstrated readiness

    International Nuclear Information System (INIS)

    Ward, T.R.; Spooner, R.

    1991-01-01

    The Department of Energy (DOE) has developed an integrated transportation system to transport transuranic (TRU) waste from ten widely-dispersed generator sites to the Waste Isolation Pilot Plant (WIPP). The system consists of a Type B container, a specially- designed trailer, a lightweight tractor, the DOE ''TRANSCOM'' vehicle tracking system, and uniquely qualified and highly-trained drivers. In June of 1989, the National Academy of Sciences reviewed the transportation system and concluded that: ''The system proposed for transportation of TRU waste to WIPP is safer than that employed for any other hazardous material in the United States today and will reduce risk to very low levels'' (emphasis added). The next challenge facing the DOE was demonstrating that this system was ready to transport the TRU waste to the WIPP site efficiently and in the safest manner possible. Not only did the DOE feel that is was necessary to convince itself that the system was safe, but also representatives of the 20 states through which it would travel

  10. The WIPP transportation system: Demonstrated readiness

    International Nuclear Information System (INIS)

    Ward, T.R.; Spooner, R.

    1991-01-01

    The Department of Energy (DOE) has developed an integrated transportation system to transport transuranic (TRU) waste from ten widely-dispersed generator sites to the Waste Isolation Pilot Plant (WIPP). The system consists of a Type B container, a specially-designed trailer, a lightweight tractor, the DOE ''TRANSCOM'' vehicle tracing system, and uniquely qualified and highly-trained drivers. In June of 1989, the National Academy of Sciences reviewed the transportation system and concluded that: ''The system proposed for transportation of TRU waste to WIPP is safer than that employed for any other hazardous material in the United States today and will reduce risk to very low levels.'' The next challenge facing the DOE was demonstrating that this system was ready to transport the TRU waste to the WIPP site in the safest manner possible. Not only did the DOE feel that it was necessary to convince itself that the system was safe, but also representatives of the 23 states through which it traveled

  11. Mortuary operations following mass fatality natural disasters: a review.

    Science.gov (United States)

    Anderson, Madelyn; Leditschke, Jodie; Bassed, Richard; Cordner, Stephen M; Drummer, Olaf H

    2017-03-01

    This is a critical review to discuss the best practice approaches to mortuary operations in preparation for and the response to natural, mass fatality, disaster events, as identified by a review of published articles. The Preferred Reporting Items for Systematic Reviews and Meta-Analysis Protocols (PRISMA-P) Statement guided the identification of potential articles to use in this critical review. Subsequent searches were also conducted to identify articles relating to heat wave, and flood mortality. All identified peer-reviewed studies published in English which discussed the preparation and response of mortuaries to mass fatality natural disasters occurring in developed countries were included. Using the PRISMA-P method of identifying articles, 18 articles were selected for inclusion in this review. Although there are numerous articles which describe the mortuary response to mass fatality incidents, few articles analyzed the response, or discussed the roles which supported and enabled the organization to undertake the task of identifying disaster victims. It is thus difficult to determine objectively if the actions and activities outlined in the articles represent best-practice.

  12. Application of diagnostics to determine motor operated valve operational readiness

    International Nuclear Information System (INIS)

    Eissenberg, D.M.

    1987-01-01

    ORNL has been carrying out an aging assessment of motor-operated valves (MOVs) with the primary objective of recommending diagnostic methods for detecting and trending aging. As a result of experimental investigations at ORNL, it was discovered that the motor current during a valve stroke was a very useful diagnostic parameter for detecting and trending many MOV drive train load variations. The motor current signatures were analyzed at four levels: mean value for a stroke, gross trends during a stroke, transients, and noise frequency spectra. Examples illustrating the use of this technique are presented. The use of motor current signature analysis was also shown to apply to other electric motor driven equipment. Future work includes developing a data base of MOV diagnostics, including criteria for determining the extent of degradation and application of the technique to other LWR motor driven safety equipment

  13. Application of diagnostics to determine motor-operated valve operational readiness

    International Nuclear Information System (INIS)

    Eissenberg, D.M.

    1986-01-01

    ORNL has been carrying out an aging assessment of motor-operated valves (MOVs) with the primary objective of recommending diagnostic methods for detecting and trending aging. As a result of experimental investigations at ORNL, it was discovered that the motor current during a valve stroke was a very useful diagnostic parameter for detecting and trending many MOV drive train load variations. The motor curent signatures were analyzed at four levels: mean value for a stroke, gross trends during a stroke, transients, and noise frequency spectra. Examples illustrating the use of this technique are presented. The use of motor current signature analysis was also shown to apply to other electric motor driven equipment. Future work includes developing a data base of MOV diagnostics, including criteria for determining the extent of degradation and application of the technique to other LWR motor driven safety equipment

  14. Solar Training Network and Solar Ready Vets

    Energy Technology Data Exchange (ETDEWEB)

    Dalstrom, Tenley Ann

    2016-09-14

    In 2016, the White House announced the Solar Ready Vets program, funded under DOE's SunShot initiative would be administered by The Solar Foundation to connect transitioning military personnel to solar training and employment as they separate from service. This presentation is geared to informing and recruiting employer partners for the Solar Ready Vets program, and the Solar Training Network. It describes the programs, and the benefits to employers that choose to connect to the programs.

  15. Ready for kindergarten: Are intelligence skills enough?

    Directory of Open Access Journals (Sweden)

    Caroline Fitzpatrick

    2017-12-01

    Full Text Available This study investigated how different profiles of kindergarten readiness in terms of student intellectual ability, academic skills and classroom engagement relate to future academic performance. Participants are French-Canadian children followed in the context of the Quebec Longitudinal Study of Child Development (N = 670. Trained examiners measured number knowledge, receptive vocabulary and fluid intelligence when children were in kindergarten. Teachers rated kindergarten classroom engagement. Outcomes included fourth-grade teacherrated achievement and directly assessed mathematical skills. Latent class analyses revealed three kindergarten readiness profiles: high (57%, moderate (34% and low (9.3% readiness. Using multiple regression, we found that a more favourable kindergarten profile predicted better fourth-grade academic performance. Identifying children at risk of academic difficulty is an important step for preventing underachievement and dropout. These results suggest the importance of promoting a variety of cognitive, academic and behavioural skills to enhance later achievement in at-risk learners.

  16. Predicting implementation from organizational readiness for change: a study protocol

    Directory of Open Access Journals (Sweden)

    Kelly P Adam

    2011-07-01

    Full Text Available Abstract Background There is widespread interest in measuring organizational readiness to implement evidence-based practices in clinical care. However, there are a number of challenges to validating organizational measures, including inferential bias arising from the halo effect and method bias - two threats to validity that, while well-documented by organizational scholars, are often ignored in health services research. We describe a protocol to comprehensively assess the psychometric properties of a previously developed survey, the Organizational Readiness to Change Assessment. Objectives Our objective is to conduct a comprehensive assessment of the psychometric properties of the Organizational Readiness to Change Assessment incorporating methods specifically to address threats from halo effect and method bias. Methods and Design We will conduct three sets of analyses using longitudinal, secondary data from four partner projects, each testing interventions to improve the implementation of an evidence-based clinical practice. Partner projects field the Organizational Readiness to Change Assessment at baseline (n = 208 respondents; 53 facilities, and prospectively assesses the degree to which the evidence-based practice is implemented. We will conduct predictive and concurrent validities using hierarchical linear modeling and multivariate regression, respectively. For predictive validity, the outcome is the change from baseline to follow-up in the use of the evidence-based practice. We will use intra-class correlations derived from hierarchical linear models to assess inter-rater reliability. Two partner projects will also field measures of job satisfaction for convergent and discriminant validity analyses, and will field Organizational Readiness to Change Assessment measures at follow-up for concurrent validity (n = 158 respondents; 33 facilities. Convergent and discriminant validities will test associations between organizational readiness and

  17. e-Learning readiness amongst nursing students at the Durban ...

    African Journals Online (AJOL)

    Marilynne Coopasami

    c Centre for Excellence in Learning and Teaching, ML Sultan Campus, Durban University of Technology, Durban ... education, technological and equipment readiness require attention before it can be ... strategy; consider the benefits and disadvantages of e- ... using an appropriate tool to measure e-Learning readiness has.

  18. 47 CFR 15.118 - Cable ready consumer electronics equipment.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Cable ready consumer electronics equipment. 15... Unintentional Radiators § 15.118 Cable ready consumer electronics equipment. (a) All consumer electronics TV... provisions of this section. Consumer electronics TV receiving equipment that includes features intended for...

  19. Tank waste remediation system retrieval and disposal mission readiness-to-proceed responses to internal independent assessment

    International Nuclear Information System (INIS)

    Schaus, P.S.

    1998-01-01

    The US Department of Energy (DOE) is planning to make critical decisions during fiscal year (FY) 1998 regarding privatization contracts for the treatment of Hanford tank waste. Specifically, DOE, Richland Operations Office (RL), will make decisions related to proceeding with Phase 1 Privatization. In support of these decisions, the management and integration (M+I) contractor must be able to meet the requirements to support the Phase 1 privatization contractors. As part of the assessment of the Tank Waste Retrieval (TWR) Readiness-To-Proceed (RTP), an independent review of their process and products was required by the RL letter of August 8, 1997. The Independent Review Team reviewed the adequacy of the planning that has been done by the M+I contractor to validate that, if the plans are carried out, there is reasonable assurance of success. Overall, the RTP Independent Review Team concluded that, if the planning by the M+I contractor team is carried out with adequate funding, there is reasonable assurance that the M+I contractor will be able to deliver waste to the privatization contractor for the duration of Phase 1. This conclusion was based on addressing the recommendations contained in the Independent Review Team's Final Report and in the individual Criteria and Review Approach (CRA) forms completed during the assessment. The purpose of this report is to formally document the independent assessment and the RTP team responses to the Independent Review Team recommendations. It also provides closure logics for selected recommendations from a Lockheed Martin Hanford Corporation (LMHC) internal assessment of the Technical Basis Review (TBR) packages. This report contains the RTP recommendation closure process (Section 2.0); the closure tables (Section 3.0) which provide traceability between each review team recommendation and its corresponding Project Hanford Management Contract closure logic; and two attachments that formally document the Independent Review Team

  20. Receiver Operating Characteristics (ROCs) in Recognition Memory: A Review

    Science.gov (United States)

    Yonelinas, Andrew P.; Parks, Colleen M.

    2007-01-01

    Receiver operating characteristic (ROC) analysis is being used increasingly to examine the memory processes underlying recognition memory. The authors discuss the methodological issues involved in conducting and analyzing ROC results, describe the various models that have been developed to account for these results, review the behavioral empirical…

  1. Proposal of performance indicators/model for Operational Readiness Verification (ORV) at restart after a planned shutdown

    International Nuclear Information System (INIS)

    Hollnagel, Erik; Nygren, Magnus

    2005-12-01

    the 323-event. This leads to a proposal of an ORV-model based on the concept of maintaining control. According to this, it is essential that an organisation (a system) knows how to respond (reaction), knows what to look for (observation, attention), and knows what to anticipate (prediction). While an organisation must possess those qualities to respond to an incident in the short term, a regulator must assess the organisation possesses those qualities in the long term. In terms of performance indicators, ten Common Performance Conditions are proposed. Each is assessed with regard to whether it can be the basis of practical measurements and whether it can be used concretely to induce an improvement to operational readiness. The re-analysis of the nine ORV events suggested that adequacy of organisation, adequacy of training and experience, availability of procedures and plans, and available time would be the most important performance indicators. Further work should look into detailed measurement methods, evaluation criteria, and means of intervention all based on an explicit model of safety as an organisational function

  2. Year 2000 readiness for Tepco's nuclear power plants

    International Nuclear Information System (INIS)

    Tachibana, N.; Tomioka, Y.

    2000-01-01

    In line with our policy of positioning the Year 2000 (Y2K) problem as a major management task, we have performed Y2K readiness. We started to survey the influence of Y2K problem at Nuclear Power Plants (NPP) on February, 1996, and completed Y2K ready of NPP on October, 1999. This paper presents Y2K readiness of our NPP. Our NPP instrumentation and control can be roughly divided into two types (Monitoring System showing NPP's status, Control System to control equipment of NPP). We surveyed hardware and software of these systems to assess the influence of these systems by Y2K problem. For survey of hardware, we picked up all chips of Real Time Clock (RTC) with check of the lists of all parts on board. And we surveyed integrity to Y2K problem of picked up RTCs with their specification, instruction manual and so on. For survey of software, we picked up the system using a time parameter in software with check of system's source program. And we surveyed whether the system using a time parameter had functions that were influenced by Y2K problem. As the result of the survey, for both monitoring systems and control systems, there was no RTC chip having Y2K problem. And there was no control system with software modification required. It was confirmed that some of Monitoring Systems were required software modification. The modification of these systems was completed by October, 1999. We performed Simulated Test of Y2K to validate the result of survey and software modification. Simulated Test was performed for the confirmation of the system integrity when the system was input critical dates of Y2K problem. As the result of Simulated Test, there was no system that was confirmed the failure of survey and software modification. In addition to these Y2K readiness, referring to the existing contingency plan for emergency situations such as a system failure and a natural disaster like earthquakes and typhoons, we have completed contingency planning for Y2K. It is decided in

  3. Sleep Duration and School Readiness of Chinese Preschool Children.

    Science.gov (United States)

    Tso, Winnie; Rao, Nirmala; Jiang, Fan; Li, Albert Martin; Lee, So-Lun; Ho, Frederick Ka-Wing; Li, Sophia Ling; Ip, Patrick

    2016-02-01

    To examine the average sleep duration in Chinese preschoolers and to investigate the association between sleep duration and school readiness. This is a cross-sectional study that included 553 Chinese children (mean age = 5.46 years) from 20 preschools in 2 districts of Hong Kong. Average daily sleep duration in the last week was reported by parents and school readiness as measured by the teacher-rated Chinese Early Development Instrument (CEDI). Most Chinese preschoolers had 9-10 hours of sleep per day. Only 11% of preschoolers had the recommended 11-12 hours of sleep per day. This group was associated with more "very ready" CEDI domains. Sleep deprivation (≤7 hours per day) was associated with a lower CEDI total score, lower scores in the emotional maturity and language/cognitive domain, and prosocial behaviors subdomain but a greater score in the hyperactivity/inattention subdomain. Children with a lower family socioeconomic index, lower maternal education level, infrequent parent-child interactions, and who used electronic devices for more than 3 hours per day had shortened sleep durations. Optimal sleep duration was associated with better school readiness in preschool children, whereas sleep deprivation was associated with lower school readiness, more hyperactivity and inattention, and less prosocial behavior. Copyright © 2016 Elsevier Inc. All rights reserved.

  4. College Readiness versus College Worthiness: Examining the Role of Principal Beliefs on College Readiness Initiatives in an Urban U.S. High School

    Science.gov (United States)

    Convertino, Christina; Graboski-Bauer, Ashley

    2018-01-01

    In light of increasing emphasis on the importance of post-secondary education to personal economic security, there is growing interest to promote college readiness initiatives in high schools, particularly for low-income and minority students for whom the harmful effects of institutional inequities on college readiness is well-documented.…

  5. Usability and Workflow Evaluation of “RhEumAtic Disease Activity” (READY)

    Science.gov (United States)

    Yen, Po-Yin; Lara, Barbara; Lopetegui, Marcelo; Bharat, Aseem; Ardoin, Stacy; Johnson, Bernadette; Mathur, Puneet; Embi, Peter J.

    2016-01-01

    Summary Background RhEumAtic Disease activitY (READY) is a mobile health (mHealth) application that aims to create a shared platform integrating data from both patients and physicians, with a particular emphasis on arthritis disease activity. Methods We made READY available on an iPad and pilot implemented it at a rheumatology out-patient clinic. We conducted 1) a usability evaluation study to explore patients’ and physicians’ interactions with READY, and 2) a time motion study (TMS) to observe the clinical workflow before and after the implementation. Results A total of 33 patients and 15 physicians participated in the usability evaluation. We found usability problems in navigation, data entry, pain assessment, documentation, and instructions along with error messages. Despite these issues, 25 (75,76%) patients reported they liked READY. Physicians provided mixed feedback because they were concerned about the impact of READY on clinical workflow. Six physicians participated in the TMS. We observed 47 patient visits (44.72 hours) in the pre-implementation phase, and 42 patient visits (37.82 hours) in the post-implementation phase. We found that patients spent more time on READY than paper (4.39mins vs. 2.26mins), but overall, READY did not delay the workflow (pre = 52.08 mins vs. post = 45.46 mins). This time difference may be compensated with READY eliminating a workflow step for the staff. Conclusion Patients preferred READY to paper documents. Many found it easier to input information because of the larger font size and the ease of ‘tapping’ rather than writing-out or circling answers. Even though patients spent more time on READY than using paper documents, the longer usage of READY was mainly due to when troubleshooting was needed. Most patients did not have problems after receiving initial support from the staff. This study not only enabled improvements to the software but also serves as good reference for other researchers or institutional decision

  6. Non-operative treatment of spontaneous spinal epidural hematomas: a review of the literature and a comparison with operative cases : a review of the literature and a comparison with operative cases

    NARCIS (Netherlands)

    Groen, R J M

    OBJECTIVE: To identify factors that favour spontaneous recovery in patients who suffered a spontaneous spinal epidural hematoma (SSEH). METHODS: The literature was reviewed regarding non-operative cases of SSEH (SSEH(cons)). Sixty-two cases from the literature and 2 of our own cases were collected,

  7. Caffeine to optimize cognitive function for military mission-readiness: a systematic review and recommendations for the field.

    Science.gov (United States)

    Crawford, Cindy; Teo, Lynn; Lafferty, Lynn; Drake, Angela; Bingham, John J; Gallon, Matthew D; O'Connell, Meghan L; Chittum, Holly K; Arzola, Sonya M; Berry, Kevin

    2017-06-01

    In 2001 the Institute of Medicine (IOM) released a report on the use of caffeine during sustained military operations in which recommendations for research and practice were made. This systematic review serves as an update on the current quality of the evidence and addresses gaps in the current literature surrounding the effects of caffeinated foods and beverages on cognitive functioning in healthy adult populations exposed to military-like moderators. PubMed, CINAHL, Embase, PsycInfo, and the Cochrane Library were searched. Peer-reviewed randomized controlled trials published in the English language since 1998 were eligible. Twenty-five trials were included and assessed for methodological quality, and descriptive data were extracted according to each military-like moderator identified. Moderators included sleep deprivation (n = 17), physical or mental exertion (n = 4), sleep deprivation combined with a sustained military operation (n = 3), and physical exertion combined with low ambient temperature (n = 1). The effects of caffeine supplementation on cognitive functioning in sleep-deprived subjects included improvements in attention and vigilance, complex reaction time, and problem solving and reasoning in the trials reviewed. These findings are consistent with the conclusions reached in the 2001 IOM report. This review contributes to the field by addressing gaps outlined in the IOM report. © The Author(s) 2017. Published by Oxford University Press on behalf of the International Life Sciences Institute. All rights reserved. For Permissions, please e-mail: journals.permissions@oup.com.

  8. A system architecture for sharing de-identified, research-ready brain scans and health information across clinical imaging centers.

    Science.gov (United States)

    Chervenak, Ann L; van Erp, Theo G M; Kesselman, Carl; D'Arcy, Mike; Sobell, Janet; Keator, David; Dahm, Lisa; Murry, Jim; Law, Meng; Hasso, Anton; Ames, Joseph; Macciardi, Fabio; Potkin, Steven G

    2012-01-01

    Progress in our understanding of brain disorders increasingly relies on the costly collection of large standardized brain magnetic resonance imaging (MRI) data sets. Moreover, the clinical interpretation of brain scans benefits from compare and contrast analyses of scans from patients with similar, and sometimes rare, demographic, diagnostic, and treatment status. A solution to both needs is to acquire standardized, research-ready clinical brain scans and to build the information technology infrastructure to share such scans, along with other pertinent information, across hospitals. This paper describes the design, deployment, and operation of a federated imaging system that captures and shares standardized, de-identified clinical brain images in a federation across multiple institutions. In addition to describing innovative aspects of the system architecture and our initial testing of the deployed infrastructure, we also describe the Standardized Imaging Protocol (SIP) developed for the project and our interactions with the Institutional Review Board (IRB) regarding handling patient data in the federated environment.

  9. Ventilation Systems Operating Experience Review for Fusion Applications

    International Nuclear Information System (INIS)

    Cadwallader, L.C.

    1999-01-01

    This report is a collection and review of system operation and failure experiences for air ventilation systems in nuclear facilities. These experiences are applicable for magnetic and inertial fusion facilities since air ventilation systems are support systems that can be considered generic to nuclear facilities. The report contains descriptions of ventilation system components, operating experiences with these systems, component failure rates, and component repair times. Since ventilation systems have a role in mitigating accident releases in nuclear facilities, these data are useful in safety analysis and risk assessment of public safety. An effort has also been given to identifying any safety issues with personnel operating or maintaining ventilation systems. Finally, the recommended failure data were compared to an independent data set to determine the accuracy of individual values. This comparison is useful for the International Energy Agency task on fusion component failure rate data collection

  10. Stochastic Methods Applied to Power System Operations with Renewable Energy: A Review

    Energy Technology Data Exchange (ETDEWEB)

    Zhou, Z. [Argonne National Lab. (ANL), Argonne, IL (United States); Liu, C. [Argonne National Lab. (ANL), Argonne, IL (United States); Electric Reliability Council of Texas (ERCOT), Austin, TX (United States); Botterud, A. [Argonne National Lab. (ANL), Argonne, IL (United States)

    2016-08-01

    Renewable energy resources have been rapidly integrated into power systems in many parts of the world, contributing to a cleaner and more sustainable supply of electricity. Wind and solar resources also introduce new challenges for system operations and planning in terms of economics and reliability because of their variability and uncertainty. Operational strategies based on stochastic optimization have been developed recently to address these challenges. In general terms, these stochastic strategies either embed uncertainties into the scheduling formulations (e.g., the unit commitment [UC] problem) in probabilistic forms or develop more appropriate operating reserve strategies to take advantage of advanced forecasting techniques. Other approaches to address uncertainty are also proposed, where operational feasibility is ensured within an uncertainty set of forecasting intervals. In this report, a comprehensive review is conducted to present the state of the art through Spring 2015 in the area of stochastic methods applied to power system operations with high penetration of renewable energy. Chapters 1 and 2 give a brief introduction and overview of power system and electricity market operations, as well as the impact of renewable energy and how this impact is typically considered in modeling tools. Chapter 3 reviews relevant literature on operating reserves and specifically probabilistic methods to estimate the need for system reserve requirements. Chapter 4 looks at stochastic programming formulations of the UC and economic dispatch (ED) problems, highlighting benefits reported in the literature as well as recent industry developments. Chapter 5 briefly introduces alternative formulations of UC under uncertainty, such as robust, chance-constrained, and interval programming. Finally, in Chapter 6, we conclude with the main observations from our review and important directions for future work.

  11. Current rules and state of readiness of the competitive market

    International Nuclear Information System (INIS)

    Campbell, B.

    2001-01-01

    The focus of this presentation was on the governance, operation and regulation of the Independent Market Operator (IMO) in a competitive electricity market in Ontario. The presentation also included an update on the progress toward market readiness and discussed the principles guiding government decision making, recognizing that it is government that holds the decision on the market opening date. The IMO has been running Ontario's bulk electric system for more than 50 years, overseeing its safe and reliable operation while balancing demand and supply. IMOs are also leading the drive to a competitive, deregulated wholesale electricity marketplace in Ontario. When open, IMOs will run the electricity spot market, collecting offers from suppliers and bids from purchasers to determine a spot market price for electricity which will reflect demand across the province. Rules and processes are being developed to ensure the Ontario marketplace will operate to benefit both consumers and producers. The four principles guiding governments in the opening of electricity markets are to protect consumers and offer more choice, ensure a strong business climate with a reliable supply of electricity, to protect the environment, and to support alternative sources of power

  12. Motor current signature analysis for determining operational readiness of motor-operated valves (MOVs)

    International Nuclear Information System (INIS)

    Kryter, R.C.; Haynes, H.D.

    1987-01-01

    Motor current signature analysis (MCSA) is a novel diagnostic process for condition monitoring of electric-motor-driven mechanical equipment (e.g., pumps, motor-operated valves, compressors, and processing machinery). The MCSA process identifies, characterizes, and trends over time the instantaneous load variations of mechanical equipment in order to diagnose changes in the condition of the equipment (e.g., due to degradation or service wear), which, if allowed to continue, may lead to failure. It monitors the instantaneous variations (noise content) in the electric current flowing through the power leads to the electric motor that drives the equipment. The motor itself thereby acts as a transducer, sensing both large and small, long-term and rapid, mechanical load variations and converting them to variations in the induced current generated in the motor windings. This motor current noise signature is detected, amplified, and further processed as needed to examine its time domain and frequency domain (spectral) characteristics. The operational principles of MCSA and the nonintrusive data collection apparatus and procedure used with MOVs will be described. Data collected from MOVs in both laboratory and in-plant environments will also be shown to illustrate the ability of MCSA to ''see'' the detailed inner workings of the valve and operator and thus to detect degraded performance at an incipient stage. (Set of 18 vugraphs)

  13. Vacuum system operating experience review for fusion applications

    International Nuclear Information System (INIS)

    Cadwallader, L.C.

    1994-03-01

    This report presents a review of vacuum system operating experiences from particle accelerator, fusion experiment, space simulation chamber, and other applications. Safety relevant operating experiences and accident information are discussed. Quantitative order-of-magnitude estimates of vacuum system component failure rates and accident initiating event frequencies are presented for use in risk assessment, reliability, and availability studies. Safety concerns with vacuum systems are discussed, including personnel safety, foreign material intrusion, and factors relevant to vacuum systems being the primary confinement boundary for tritium and activated dusts. This information should be useful to fusion system designers and safety analysts, such as the team working on the Engineering Design Activities for the International Thermonuclear Experimental Reactor

  14. Irradiation of ready made meals -Lasagne

    International Nuclear Information System (INIS)

    Barkia, Ines

    2007-01-01

    The effect of ionizing radiation on the microbiological, nutritional, chemical and sensory quality of chilled ready-made meals was assessed. The ready meals used for this experimental work are lasagne. Following arrival at the semi-industrial Cobalt 60 irradiation facility, the meals were either left unirradiated or irradiated with doses of 2 or 4 kGy after which they were stored for up to 23 days at 3C. Results showed that 2 or 4 kGy doses of gamma irradiation decreased the total counts of mesophilic aerobic bacteria and increased the shelf-life of lasagne. In terms of nutritional quality, it was found that losses of vitamin A and E due to irradiation treatment were considerable at 4 kGy. Total acidity, and p H, were all well within the acceptable limit for up to one week for ready meals treated with 2 and 4 kGy whereas peroxide index showed high values at 4 kGy. Sensory results showed no significant differences between the non-irradiated and irradiated meals at 2 kGy. However, the results were less promising at 4 kGy since differences were significant. (Author). 60 refs

  15. Prolonged Operative Duration Increases Risk of Surgical Site Infections: A Systematic Review.

    Science.gov (United States)

    Cheng, Hang; Chen, Brian Po-Han; Soleas, Ireena M; Ferko, Nicole C; Cameron, Chris G; Hinoul, Piet

    The incidence of surgical site infection (SSI) across surgical procedures, specialties, and conditions is reported to vary from 0.1% to 50%. Operative duration is often cited as an independent and potentially modifiable risk factor for SSI. The objective of this systematic review was to provide an in-depth understanding of the relation between operating time and SSI. This review included 81 prospective and retrospective studies. Along with study design, likelihood of SSI, mean operative times, time thresholds, effect measures, confidence intervals, and p values were extracted. Three meta-analyses were conducted, whereby odds ratios were pooled by hourly operative time thresholds, increments of increasing operative time, and surgical specialty. Pooled analyses demonstrated that the association between extended operative time and SSI typically remained statistically significant, with close to twice the likelihood of SSI observed across various time thresholds. The likelihood of SSI increased with increasing time increments; for example, a 13%, 17%, and 37% increased likelihood for every 15 min, 30 min, and 60 min of surgery, respectively. On average, across various procedures, the mean operative time was approximately 30 min longer in patients with SSIs compared with those patients without. Prolonged operative time can increase the risk of SSI. Given the importance of SSIs on patient outcomes and health care economics, hospitals should focus efforts to reduce operative time.

  16. Teachers’ Readiness to Implement Digital Curriculum in Kuwaiti Schools

    Directory of Open Access Journals (Sweden)

    Hamed Mubarak Al-Awidi

    2017-03-01

    Findings\tTeachers are moderately ready for implementation of the digital curriculum in both components of readiness (technical and pedagogical. Teachers identified some factors that that hinder their readiness. These factors are related to time constraints, knowledge and skills, infrastructure, and technical support. Recommendations for Practitioners: This paper will guide curriculum decision makers to find the best ways to help and support teachers to effectively implement the digital. Future Research: Follow up studies may examine the effectiveness of teacher education pro-grams in preparing students teachers to implement the digital curriculum, and the role of education decision makers in facilitating the implementation of the digital curriculum.

  17. Operations planning simulation: Model study

    Science.gov (United States)

    1974-01-01

    The use of simulation modeling for the identification of system sensitivities to internal and external forces and variables is discussed. The technique provides a means of exploring alternate system procedures and processes, so that these alternatives may be considered on a mutually comparative basis permitting the selection of a mode or modes of operation which have potential advantages to the system user and the operator. These advantages are measurements is system efficiency are: (1) the ability to meet specific schedules for operations, mission or mission readiness requirements or performance standards and (2) to accomplish the objectives within cost effective limits.

  18. Computer-Based Assessment of School Readiness and Early Reasoning

    Science.gov (United States)

    Csapó, Beno; Molnár, Gyöngyvér; Nagy, József

    2014-01-01

    This study explores the potential of using online tests for the assessment of school readiness and for monitoring early reasoning. Four tests of a face-to-face-administered school readiness test battery (speech sound discrimination, relational reasoning, counting and basic numeracy, and deductive reasoning) and a paper-and-pencil inductive…

  19. The Readiness of Students to Learn Interprofessional Teamwork in Antenatal Care

    Directory of Open Access Journals (Sweden)

    Dina Zakiyyatul Fuadah

    2016-09-01

    Full Text Available Introduction: Indonesia as a developing country have a higher Maternal Mortality Rate (MMR. The prevention efforts is developing interprofessional collaborative practice (IPCP in the level of health care. Collaboration attitudes should start from education level through interprofessional education training and simulation for student. The objective of this study was to analyze the effect of interprofessional education training toward the readiness of students to learn interprofessional teamwork in antenatal care. Methods: Quasi-experimental design (pre test and post test without control with Time-Series Design. Participants used in this study were students of five semester in STIKes Karya Husada Kediri year of 2011/2012 and the number of samples are 60 students. Technique sampling using simple random. The data collected by used questionnaires Readiness Interprofessional Learning Scale (RIPLS and checklist observations using Teamwork Score (TWS. Anova, Friedman test, and Kruskal Wallis was used to statistically analyzed the data. Results: Readiness to learn interprofessional teamwork indicates the value of p = 0.001 thats means there are significant differences between the readiness before and after training IPE. Delta test showed that p value > 0.05 so there is no difference between the three programs study on readiness to learn interprofessional teamwork in antenatal care. Discussion: Interprofessional education training using simulation methods can affect the readiness of nursing, midwifery and nutritionist students for learning interprofessional teamwork in antenatal care. Keywords: interprofessional education, readiness, training and simulations, pre clinics students, antenatal care.

  20. Technical Review of Operator's Destructive Analyses at the Rokkasho Reprocessing Plant: Strengthening the Transparency of the Operator's Measurement System

    International Nuclear Information System (INIS)

    Sato, N.; Katchi, T.; Niitsu, Y.; Duhamel, G.; Decaillon, J.-G.; Toervenyi, A.; Sayama, H.; Hara, S.

    2015-01-01

    The Rokkasho Reprocessing Plant is a large-scale nuclear facility in Japan. For the purposes of process control, product management and nuclear material accountancy for safeguards purposes, the laboratory of the facility operator analyzes thousands of samples from various process streams and with a multitude of matrices. Transparency of operational procedures, quality control measures and sample analytical results among the facility operator and state and international safeguards authorities are required to assess the facility operator's measurement system, and thus to assure a credible safeguards approach. The facility operator, Japan Nuclear Fuel, Limited (JNFL), is engaged in continuous improvement of its nuclear material analyzes. For the declarations to the inspectorates, it is important that JNFL and the safeguards authorities be able to confirm that the analytical methods used by JNFL are reliable and meet the latest version of the International Target Values. Since 2012 JNFL, the IAEA and the SSAC have carried out several technical reviews of the destructive analysis (DA) processes as a means of strengthening the transparency of the DA measurement systems. The goal of the DA technical reviews is to (1) assess past commitments of the JNFL plan for analytical improvement, (2) review the JNFL Quality System by means of documentation reviews and in-field demonstrations, and (3) review the analytical performance of the JNFL lab through its own results or from inter-laboratory comparison exercises. Throughout this process, subject-matter experts from all organizations met with JNFL laboratory staff and discussed analytical concerns and solutions. The outcome of these technical reviews was a series of recommendations to JNFL for strengthening its plan for continuous improvement. This paper presents the methodology of the DA technical reviews, the communication scheme and some examples of the outcome for JNFL to improve its DA methods and analytical

  1. Common pitfalls to avoid during workover operations

    International Nuclear Information System (INIS)

    Byars, R.R.

    1994-01-01

    Remedial well work has been, and will continue to be, an integral part of oil company operations. More than 16,000 workover operations were performed during 1993 in the US. The economic impact from workover operations is usually immediate due to flowlines, tank batteries and other equipment being in place and ready for service prior to the workover. Similarly, problems encountered during workover operations contribute an immediate negative impact to project economics. Guidelines for common mistake avoidance are presented. They will be especially helpful for those individuals not well trained in workover preparation and supervision

  2. Technology Readiness of School Teachers: An Empirical Study of Measurement and Segmentation

    Science.gov (United States)

    Badri, Masood; Al Rashedi, Asma; Yang, Guang; Mohaidat, Jihad; Al Hammadi, Arif

    2014-01-01

    The Technology Readiness Index (TRI) developed by Parasuraman (2000) was adapted to measure the technology readiness of public school teachers in Abu Dhabi, United Arab Emirates. The study aims at better understanding the factors (mostly demographics) that affect such readiness levels. In addition, Abu Dhabi teachers are segmented into five main…

  3. Defining School Readiness in Maryland: A Multi-Dimensional Perspective. Publication #2012-44

    Science.gov (United States)

    Forry, Nicole; Wessel, Julia

    2012-01-01

    Increased emphasis has been placed on children's ability to enter kindergarten ready to learn, a concept referred to as "school readiness." School readiness has been defined by the Maryland State Department of Education as "the stage of human development that enables a child to engage in, and benefit from, primary learning…

  4. GIS Readiness Survey 2014

    DEFF Research Database (Denmark)

    Schrøder, Lise; Hvingel, Line Træholt; Hansen, Henning Sten

    2014-01-01

    The GIS Readiness Survey 2014 is a follow-up to the corresponding survey that was carried out among public institutions in Denmark in 2009. The present survey thus provides an updated image of status and challenges in relation to the use of spatial information, the construction of the com- mon...

  5. School Readiness Factor Analyzed.

    Science.gov (United States)

    Brenner, Anton; Scott, Leland H.

    This paper is an empirical statistical analysis and interpretation of data relating to school readiness previously examined and reported on a theoretical basis. A total of 118 white, middle class children from six consecutive kindergarten groups in Dearborn, Michigan were tested with seven instruments, evaluated in terms of achievement, ability,…

  6. Consumer behaviors towards ready-to-eat foods based on food-related lifestyles in Korea

    OpenAIRE

    Bae, Hyun-Joo; Chae, Mi-Jin; Ryu, Kisang

    2010-01-01

    The purpose of this study was to examine consumers' behaviors toward ready-to-eat foods and to develop ready-to-eat food market segmentation in Korea. The food-related lifestyle and purchase behaviors of ready-to-eat foods were evaluated using 410 ready-to-eat food consumers in the Republic of Korea. Four factors were extracted by exploratory factor analysis (health-orientation, taste-orientation, convenience-orientation, and tradition-orientation) to explain the ready-to eat food consumers' ...

  7. STRUCTURE OF READINESS OF MEDICAL COLLEGE STUDENTS FOR PROFESSIONAL SELF-DEVELOPMENT

    Directory of Open Access Journals (Sweden)

    Кирило Соцький

    2014-04-01

    Full Text Available The article reflects the analysis of the existing approaches to interpretation of the notion of selfdevelopment in psychological and pedagogical literature. It has been determined, that professional and personal self-development is carried out with the help of mechanisms of self-knowledge, self-organization, self-education, self-esteem, self-control. The research also presents the clarified essence and structure of the readiness of medical college students for professional self-development. Value, motivational, cognitive, operating, and volitional components have been singled out. Factors and stages of intending medical employees’ selfdevelopment have been substantiated in the article.

  8. Aircraft operations management manual

    Science.gov (United States)

    1992-01-01

    The NASA aircraft operations program is a multifaceted, highly diverse entity that directly supports the agency mission in aeronautical research and development, space science and applications, space flight, astronaut readiness training, and related activities through research and development, program support, and mission management aircraft operations flights. Users of the program are interagency, inter-government, international, and the business community. This manual provides guidelines to establish policy for the management of NASA aircraft resources, aircraft operations, and related matters. This policy is an integral part of and must be followed when establishing field installation policy and procedures covering the management of NASA aircraft operations. Each operating location will develop appropriate local procedures that conform with the requirements of this handbook. This manual should be used in conjunction with other governing instructions, handbooks, and manuals.

  9. Transferring Knowledge from Building Operation to Design: A literature review

    DEFF Research Database (Denmark)

    Rasmussen, Helle Lohmann; Jensen, Per Anker; Gregg, Jay Sterling

    . Knowing that the list lacks inputs from cultural and organizational theory, the paper suggests that further research should focus on taking these suggestions to an operational level for the benefit of FM, building clients and design teams. Furthermore, it is found that major concepts that could......As a solution to the previously identified gap between expected and actual building performance, this paper investigates how knowledge can be transferred from operation to design. This is assumed to help bridge the gap and increase the performance of new built facilities. By conducting a systematic...... literature review, it is found, that the theoretical approach in the reviewed articles has a significant impact on the level of how applicable the recommendations are in practice. Furthermore, a list of identified tools to enable knowledge transfer is provided, including POE, PPP and building commissioning...

  10. Cluff Lake mill operations - a historical review

    International Nuclear Information System (INIS)

    Schnell, H.A.; Doell, E.; Corpus, E.

    2000-01-01

    The Cluff Lake operation started uranium production in 1980 and has produced over 50 million pounds of uranium since that time. The plant started with high grade ore (+30% U) processing and went through a series of modifications to its present operating status: Phase 1 - High-grade ore (+30% U) processing with acid leach and iron cake precipitation followed by direct yellowcake precipitation. Lower grade ore was concentrated in a gravity circuit to +30% U; Phase 1 1/2 - Reprocessing Phase 1 gravity tailings (+1% U) in an acid leach circuit with solvent extraction purification prior to yellowcake precipitation; Reprocessing of the Phase 1 leach tails (58 g/t Au) to recover gold in a Cyanide/CIP circuit followed by additional uranium recovery, and destruction and recycle of cyanide by volatilization; and Phase 2 - Treatment of the lower grade ore (0.5 to 1% U) at an increased tonnage with an acid leach, CCD, SX circuit as it is found in the existing plant. This paper will review the various processing circuits used during the phases of the Cluff Lake Mill from first uranium production to the present operation. (author)

  11. Smoke Ready Toolbox for Wildfires

    Science.gov (United States)

    This site provides an online Smoke Ready Toolbox for Wildfires, which lists resources and tools that provide information on health impacts from smoke exposure, current fire conditions and forecasts and strategies to reduce exposure to smoke.

  12. External Factors, Internal Factors and Self-Directed Learning Readiness

    Science.gov (United States)

    Ramli, Nurjannah; Muljono, Pudji; Afendi, Farit M.

    2018-01-01

    There are many factors which affect the level of self-directed learning readiness. This study aims to investigate the relationship between external factors, internal factors and self-directed learning readiness. This study was carried out by using a census method for fourth year students of medical program of Tadulako University. Data were…

  13. E-Learning Readiness in Public Secondary Schools in Kenya

    Science.gov (United States)

    Ouma, Gordon O.; Awuor, Fredrick M.; Kyambo, Benjamin

    2013-01-01

    As e-learning becomes useful to learning institutions worldwide, an assessment of e-learning readiness is essential for the successful implementation of e-learning as a platform for learning. Success in e-learning can be achieved by understanding the level of readiness of e-learning environments. To facilitate schools in Kenya to implement…

  14. Students' Readiness for E-Learning Application in Higher Education

    Science.gov (United States)

    Rasouli, Atousa; Rahbania, Zahra; Attaran, Mohammad

    2016-01-01

    The main goal of this research was to investigate the readiness of art students in applying e-learning. This study adopted a survey research design. From three public Iranian Universities (Alzahra, Tarbiat Modares, and Tehran), 347 students were selected by multistage cluster sampling and via Morgan Table. Their readiness for E-learning…

  15. A proposed framework of big data readiness in public sectors

    Science.gov (United States)

    Ali, Raja Haslinda Raja Mohd; Mohamad, Rosli; Sudin, Suhizaz

    2016-08-01

    Growing interest over big data mainly linked to its great potential to unveil unforeseen pattern or profiles that support organisation's key business decisions. Following private sector moves to embrace big data, the government sector has now getting into the bandwagon. Big data has been considered as one of the potential tools to enhance service delivery of the public sector within its financial resources constraints. Malaysian government, particularly, has considered big data as one of the main national agenda. Regardless of government commitment to promote big data amongst government agencies, degrees of readiness of the government agencies as well as their employees are crucial in ensuring successful deployment of big data. This paper, therefore, proposes a conceptual framework to investigate perceived readiness of big data potentials amongst Malaysian government agencies. Perceived readiness of 28 ministries and their respective employees will be assessed using both qualitative (interview) and quantitative (survey) approaches. The outcome of the study is expected to offer meaningful insight on factors affecting change readiness among public agencies on big data potentials and the expected outcome from greater/lower change readiness among the public sectors.

  16. SALTO guidelines. Guidelines for peer review of long term operation and ageing management of nuclear power plants

    International Nuclear Information System (INIS)

    2008-01-01

    The average age of nuclear power plants (NPPs) connected to the grid worldwide is increasing. About 20% of all the power reactors operating worldwide have been in operation for more than 30 years, and almost 50% have been in operation for 20 to 30 years, while a rather limited number of new NPPs are being put into operation. In view of this trend, many countries are giving a high priority to continuing the operation of NPPs beyond the time frame originally anticipated (e.g. 30 or 40 years). Long term operation (LTO) for NPPs is operation beyond the established time frame originally set forth by the license term, design limits, standards or regulations. LTO needs to be justified by a safety assessment considering life limiting processes and features for structures, systems and components. Proper and safe LTO is based on the experience and practices of various countries in areas such as plant license renewal, life extension, continued operation and life management. Other activities, including periodic safety review, ageing management and plant modification, are also relevant to LTO. Ageing management of an NPP is an important activity that must be considered before and in conjunction with the decision to enter LTO. Ageing management of NPPs deals with the physical ageing of structures, systems and components (SSCs) that can result in the degradation of their performance characteristics. Thus ageing management helps ensure that SSCs important to safety remain capable of performing their required safety functions. An effective ageing management programme (AMP) is a key element of the safe and reliable operation of NPPs during the originally planned time frame originally planned for their operation, as well as for the period of LTO. In order to assist Member States in managing ageing effectively, the IAEA is developing related safety standards and guidance publications. International peer review is a useful tool for Member States to exchange experience, learn from each

  17. Columbia River system operation review. Final environmental impact statement

    International Nuclear Information System (INIS)

    1995-11-01

    The Columbia River and its tributaries are the primary water system in the Pacific Northwest, draining some 219,000 square miles in seven states and another 39,500 square miles in British Columbia. Beginning in the 1930's, the Columbia River has been significantly modified by construction of 30 major dams on the river and its tributaries, along with dozens of non-Federal projects. Construction and subsequent operation of these water development projects have contributed to eight primary uses of the river system, including navigation, flood control, irrigation, electric power generation, fish migration, fish and wildlife habitat, recreation, and water supply and quality considerations. Increasing stress on the water development of the Columbia River and its tributaries has led primary Federal agencies to undertake intensive analysis and evaluation of the operation of these projects. These agencies are the U.S. Army Corps of Engineers and the Bureau of Reclamation, who operate the large Federal dams on the river, and the Bonneville Power Administration who sells the power generated at the dams. This review, termed the System Operation Review (SOR), has as its ultimate goal to define a strategy for future operation of the major Columbia River projects which effectively considers the needs of all river uses. This volume, Appendix D: Cultural resources appendix, Technical imput includes the following: Development of geomorphology based framework for cultural resources management, Dworshak Reservoir, Idaho; Impact profiles for SOR reservoirs; comments from the following Native American tribes: Burns Paiute Tribe; Coville Confederated Tribes; Confederated Tribes of the Warm Springs Indian Reservation; Confederated Tribes and bands of the Yakama Indian Nation (comments); Nez Perce Tribe; Coeur D'Alene Tribe; Spokane Tribe of Indians; The confederated Tribes of the Umatilla Indian Reservation

  18. Effects of Personnel Injuries on Cinc Mission Readiness

    Science.gov (United States)

    1997-09-01

    activities in which injury may be sustained: ACTSPEC (activity specific): 1 =N/A 5 = 0 Course 9 = Fastrope 13 = Patrolling 2 = Running 6 = Weightlifting 10...NAVAL POSTGRADUATE SCHOOL Monterey, California THESIS EFFECTS OF PERSONNEL INJURIES ON CINC MISSION READINESS by Erin G. Snow September, 1997...Thesis 4. TITLE AND SUBTITLE EFFECTS OF PERSONNEL INJURIES ON CINC MISSION READINESS 6. AUTHOR(S) Snow, Erin G. 5. FUNDING NUMBERS 7. PERFORMING

  19. Shaping the operating room and perioperative systems of the future: innovating for improved competitiveness.

    Science.gov (United States)

    Seim, Andreas R; Sandberg, Warren S

    2010-12-01

    To review the current state of anesthesiology for operative and invasive procedures, with an eye toward possible future states. Anesthesiology is at once a mature specialty and in a crisis--requiring breakthrough to move forward. The cost of care now approaches reimbursement, and outcomes as commonly measured approach perfection. Thus, the cost of further improvements seems ready to topple the field, just as the specialty is realizing that seemingly innocuous anesthetic choices have long-term consequences, and better practice is required. Anesthesiologists must create more headroom between costs and revenues in order to sustain the academic vigor and creativity required to create better clinical practice. We outline three areas in which technological and organizational innovation in anesthesiology can improve competitiveness and become a driving force in collaborative efforts to develop the operating rooms and perioperative systems of the future: increasing the profitability of operating rooms; increasing the efficiency of anesthesia; and technological and organizational innovation to foster improved patient flow, communication, coordination, and organizational learning.

  20. Length of stay after vaginal birth: sociodemographic and readiness-for-discharge factors.

    Science.gov (United States)

    Weiss, Marianne; Ryan, Polly; Lokken, Lisa; Nelson, Magdalen

    2004-06-01

    The impact of reductions in postpartum length of stay have been widely reported, but factors influencing length of hospital stay after vaginal birth have received less attention. The study purpose was to compare the sociodemographic characteristics and readiness for discharge of new mothers and their newborns at 3 discharge time intervals, and to determine which variables were associated with postpartum length of stay. The study sample comprised 1,192 mothers who were discharged within 2 postpartum days after uncomplicated vaginal birth at a tertiary perinatal center in the midwestern United States. The sample was divided into 3 postpartum length-of-stay groups: group 1 (18-30 hr), group 2 (31-42 hr), and group 3 (43-54 hr). Sociodemographic and readiness-for-discharge data were collected by self-report and from a computerized hospital information system. Measures of readiness for discharge included perceived readiness (single item and Readiness for Discharge After Birth Scale), documented maternal and neonatal clinical problems, and feeding method. Compared with other groups, the longest length-of-stay group was older; of higher socioeconomic status and education; and with more primiparous, breastfeeding, white, married mothers who were living with the baby's father, had adequate home help, and had a private payor source. This group also reported greater readiness for discharge, but their newborns had more documented clinical problems during the postbirth hospitalization. In logistic regression modeling, earlier discharge was associated with young age, multiparity, public payor source, low socioeconomic status, lack of readiness for discharge, bottle-feeding, and absence of a neonatal clinical problem. Sociodemographic characteristics and readiness for discharge (clinical and perceived) were associated with length of postpartum hospital stay. Length of stay is an outcome of a complex interface between patient, provider, and payor influences on discharge timing

  1. C-Division annual review and operating plan, August 1990

    Energy Technology Data Exchange (ETDEWEB)

    Morse, N.R.

    1990-11-01

    The Computing and Communications Division is responsible for the Laboratory's Integrated Computing Network as well as Laboratory-wide communications. Our computing network, used by 8000 people distributed throughout the nation, constitutes one of the most powerful scientific computing facilities in the world. The purpose of this publication is to inform our clients of our strategic and operating plans. We review major accomplishments since early 1989 and describe our strategic planning goals and specific projects that will guide our operations over the next couple of years. Our mission statement, planning considerations, and management policies and practices are also included.

  2. Checklist for clinical readiness published

    Science.gov (United States)

    Scientists from NCI, together with collaborators from outside academic centers, have developed a checklist of criteria to evaluate the readiness of complex molecular tests that will guide decisions made during clinical trials. The checklist focuses on tes

  3. Long term operation of nuclear power plants – IAEA SALTO peer review service and its results

    Energy Technology Data Exchange (ETDEWEB)

    Krivanek, Robert, E-mail: r.krivanek@iaea.org

    2014-12-15

    Highlights: • SALTO peer review service is designed for reviewing of ageing management and NPPs’ preparedness LTO. • It has been established as an effective tool to review the compliance with IAEA safety standards. • The important issues for safe LTO are being identified by SALTO missions. • Analysis of those issues is provided in the paper. • This peer review service is strongly recommended for NPPs prior to entering LTO period. - Abstract: This paper presents main IAEA activities for safe long term operation (LTO) which includes establishment of IAEA Safety Standards and other LTO related documents, fostering information exchange and establishing databases and provision of SALTO (Safety Aspects of Long Term Operation) peer review service. This paper provides insights into IAEA SALTO peer review service objectives, scope and methodology. The SALTO peer review service was designed to assist nuclear power plant (NPP) operators in adopting a proper approach to LTO of their plants and in implementing complete and appropriate activities to ensure that plant safety will be maintained during the LTO period. The SALTO peer review service can also support regulators in establishing or improving regulatory and licensing strategies for LTO of NPPs. Issues derived from 19 SALTO missions and 2 LTO modules of OSART (Operational Safety Review Team) missions conducted during the period of 2005 to March 2014 are also analyzed in this paper.

  4. Validating Acquisition IS Integration Readiness with Drills

    DEFF Research Database (Denmark)

    Wynne, Peter J.

    2017-01-01

    To companies, mergers and acquisitions are important strategic tools, yet they often fail to deliver their expected value. Studies have shown the integration of information systems is a significant roadblock to the realisation of acquisition benefits, and for an IT department to be ready......), to understand how an IT department can use them to validate their integration plans. The paper presents a case study of two drills used to validate an IT department’s readiness to carry out acquisition IS integration, and suggests seven acquisition IS integration drill characteristics others could utilise when...

  5. Why Do We Need Future Ready Librarians? That Kid.

    Science.gov (United States)

    Ray, Mark

    2018-01-01

    In this article, the author examines the need of the Future Ready Librarians (FRL) initiative. The FRL Framework helps define how librarians might lead, teach, and support schools based on the core research-based components defined by Future Ready. The framework and initiative are intended to be ways to change the conversation about school…

  6. Balancing the Readiness Equation in Early Childhood Education Reform

    Science.gov (United States)

    Brown, Christopher P.

    2010-01-01

    As policy-makers continue to implement early childhood education reforms that frame the field as a mechanism that is to ready children for elementary school success, questions arise as to how the multiple variables in the readiness equation, such as the child, family, and program, are affected by these policies. The instrumental case study…

  7. Parental Learning and School Readiness in the Gearing Up for Kindergarten Program

    Directory of Open Access Journals (Sweden)

    Sharon Query

    2013-06-01

    Full Text Available Entering kindergarten is a key moment in a young child’s life, and parents are a child’s first teacher. What can guide parents as they assist children with school readiness? Gearing Up for Kindergarten is an intensive parent education and school readiness program designed to help parents and children prepare for school. Gearing Up for Kindergarten is a parent education program that combines early learning opportunities for pre-kindergarten children with parent education opportunities for adults. This study presents findings from evaluation efforts conducted with 59 Gearing Up for Kindergarten adult participants during the 2006-2007 school year. Participants in the program demonstrated (1 high satisfaction with program quality and experiences, (2 impacts on parental knowledge and confidence, and (3 significant and positive changes in parental practices related to school readiness. Implications for parent education and programs intended to strengthen school readiness among pre-kindergarten children are explored. Parent education on school readiness can provide a substantive resource as parents help their children develop and become ready for the school years.

  8. Periodic safety review of operational nuclear power plants. A publication within the NUSS programme

    International Nuclear Information System (INIS)

    1994-01-01

    This Safety Guide which supplements the IAEA Safety Fundamentals: The Safety of Nuclear Installations and the Code on the Safety of Nuclear Power Plants: Operation, forms part of the Agency's programme, referred to as the NUSS programme, for establishing Codes and Guides relating to nuclear power plants. A list of NUSS publications is given at the end of this book. This Guide was drafted on the basis of a systematic review approach that was endorsed by the IAEA Conference on the Safety of Nuclear Power: Strategy for the Future. The purpose of this Safety Guide is to provide guidance on the conduct of Periodic Safety Reviews (PSRs) for an operational nuclear power plant. The Guide is directed at both owners/operators and regulators. This Safety Guide deals with the PSR of an operational nuclear power plant. A PSR is a comprehensive safety review addressing all important aspects of safety, carried out at regular intervals. 22 refs, 4 figs

  9. Conjoint behavioral consultation: implementing a tiered home-school partnership model to promote school readiness.

    Science.gov (United States)

    Clarke, Brandy L; Sheridan, Susan M; Woods, Kathryn E

    2014-01-01

    An ecological perspective to school readiness focuses on child and family readiness by enhancing the developmental contexts and relationships within which children reside (e.g., home environment, parent-child relationship, home-school relationships). The Getting Ready intervention is an ecological, relationally based, tiered intervention providing both universal and intensive services to children and families to promote child and family school readiness. Intensive level consultation services were provided via Conjoint Behavioral Consultation (CBC; Sheridan & Kratochwill, 1992 , 2008 ). The purpose of this article is to describe the implementation and effects of CBC within the Getting Ready intervention to promote child and family school readiness. Keys to successful implementation of the CBC intervention and issues needing further investigation are discussed.

  10. Operating System Concepts for Reconfigurable Computing: Review and Survey

    Directory of Open Access Journals (Sweden)

    Marcel Eckert

    2016-01-01

    Full Text Available One of the key future challenges for reconfigurable computing is to enable higher design productivity and a more easy way to use reconfigurable computing systems for users that are unfamiliar with the underlying concepts. One way of doing this is to provide standardization and abstraction, usually supported and enforced by an operating system. This article gives historical review and a summary on ideas and key concepts to include reconfigurable computing aspects in operating systems. The article also presents an overview on published and available operating systems targeting the area of reconfigurable computing. The purpose of this article is to identify and summarize common patterns among those systems that can be seen as de facto standard. Furthermore, open problems, not covered by these already available systems, are identified.

  11. MODELLING THE FUTURE MUSIC TEACHERS’ READINESS TO PERFORMING AND INTERPRETIVE ACTIVITY DURING INSTRUMENTAL TRAINING

    Directory of Open Access Journals (Sweden)

    Chenj Bo

    2016-11-01

    Full Text Available One of the main fields of training future music teachers in Ukrainian system of higher education is instrumental music one, such as skills of performing and interpretive activities. The aim of the article is to design a model of the future music teachers’ readiness to performing and interpretive activities in musical and instrumental training. The process of modelling is based on several interrelated scientific approaches, including systemic, personality-centered, reflective, competence, active and creative ones. While designing a model of music future teachers’ readinesses to musical interpretive activities, its philosophical, informative, interactive, hedonistic, creative functions are taken into account. Important theoretical and methodological factors are thought to be principles of musical and pedagogical education: culture correspondence and reflection; unity of emotional and conscious, artistic and technical items in musical education; purposeful interrelations and art and pedagogical communication between teachers and students; intensification of music and creative activity. Above-mentioned pedagogical phenomenon is subdivided into four components: motivation-oriented, cognitive-evaluating, performance-independent, creative and productive. For each component relevant criteria and indicators are identified. The stages of future music teachers’ readiness to performing interpretative activity are highlighted: information searching one, which contributes to the implementation of complex diagnostic methods (surveys, questionnaires, testing; regulative and performing one, which is characterized by future music teachers’ immersion into music performing and interpretative activities; operational and reflective stage, which involves activation of mechanisms of future music teachers’ self-knowledge, self-realization, formation of skills of independent artistic and expressive various music genres and styles interpretation; projective and

  12. Non-technical skills of the operating theatre scrub nurse: literature review.

    Science.gov (United States)

    Mitchell, Lucy; Flin, Rhona

    2008-07-01

    This paper is a report of a review to identify the non-technical (cognitive and social) skills used by scrub nurses. Recognition that failures in non-technical skills contributed to accidents in high-risk industries led to the development of research programmes to study the role of cognition and social interactions in operational safety. Recently, psychological research in operating theatres has revealed the importance of non-technical skills in safe and efficient performance. Most of the studies to date have focused on anaesthetists and surgeons. On-line sources and university library catalogues, publications of the Association for Perioperative Practice, National Association of Theatre Nurses and Association of Peri-Operative Registered Nurses were searched in 2007. Studies were included in the review if they presented data from scrub nurses on one or more of their non-technical skills. These findings were examined in relation to an existing medical non-technical skills framework with categories of communication, teamwork, leadership, situation awareness and decision-making. Of 424 publications retrieved, 13 were reviewed in detail. Ten concerned communication and eight of those also had data on teamwork. In 11 papers teamwork was examined, and one focused on nurses' situation awareness, teamwork and communication. None of the papers we reviewed examined leadership or decision-making by scrub nurses. Further work is needed to identify formally the non-technical skills which are important to the role of scrub nurse and then to design training in the identified non-technical skills during the education and development of scrub nurses.

  13. Study of the Readiness of Czech Companies to the Industry 4.0

    Directory of Open Access Journals (Sweden)

    Jakub Kopp

    2017-07-01

    Full Text Available The article deals with the results of the questionnaire survey that analyzes the readiness of Czech companies on the trend of the Industry 4.0. It means mainly whether Czech companies are interested in the fourth industrial revolution and whether they are ready for this trend. The readiness is expressed in defined levels.

  14. Development of the Writing Readiness Inventory Tool in Context (WRITIC)

    NARCIS (Netherlands)

    van Hartingsveldt, Margo J.; de Vries, Liesbeth; Cup, Edith HC; de Groot, Imelda JM; Nijhuis-van der Sanden, Maria WG

    2014-01-01

    This article describes the development of the Writing Readiness Inventory Tool in Context (WRITIC), a measurement evaluating writing readiness in Dutch kindergarten children (5 and 6 years old). Content validity was established through 10 expert evaluations in three rounds. Construct validity was

  15. FDH radiological design review guidelines

    International Nuclear Information System (INIS)

    Millsap, W.J.

    1998-01-01

    These guidelines discuss in more detail the radiological design review process used by the Project Hanford Management Contractors as described in HNF-PRO-1622, Radiological Design Review Process. They are intended to supplement the procedure by providing background information on the design review process and providing a ready source of information to design reviewers. The guidelines are not intended to contain all the information in the procedure, but at points, in order to maintain continuity, they contain some of the same information

  16. FDH radiological design review guidelines

    Energy Technology Data Exchange (ETDEWEB)

    Millsap, W.J.

    1998-09-29

    These guidelines discuss in more detail the radiological design review process used by the Project Hanford Management Contractors as described in HNF-PRO-1622, Radiological Design Review Process. They are intended to supplement the procedure by providing background information on the design review process and providing a ready source of information to design reviewers. The guidelines are not intended to contain all the information in the procedure, but at points, in order to maintain continuity, they contain some of the same information.

  17. Readiness and motivation for change among young women with broadly defined eating disorders.

    Science.gov (United States)

    Ålgars, Monica; Ramberg, Carin; Moszny, Josefine; Hagman, Jessica; Rintala, Hanna; Santtila, Pekka

    2015-01-01

    Readiness and motivation for change were examined in 32 women with broadly defined eating disorders who took part in a 10-week Cognitive Behavioral Therapy (CBT)-based group intervention. Readiness for change and eating disorder psychopathology were assessed before and after the intervention. The results revealed significant negative associations between degree of eating disorder symptoms and degree of readiness for change before the intervention started. In particular, higher levels of eating concern, shape concern, and body dissatisfaction were associated with lower motivation for change. No significant associations between degree of readiness for change before the intervention started and changes in eating disorder symptoms at the end of intervention were found. Readiness for change increased from the beginning to the end of the intervention, indicating that group CBT may be a cost-effective and time-efficient way of enhancing readiness and motivation for change in individuals with eating psychopathology.

  18. Work-readiness skills in the Fasset Sector

    Directory of Open Access Journals (Sweden)

    Melandi Raftopoulos

    2009-09-01

    Full Text Available The objective of the study was to determine the work -readiness skills that are regarded as important by employers and graduates in the Fasset Sector of South Africa. A cross-sectional survey design was  used  to  achieve  this  objective.  Two  convenience  samples, namely  24  employers  and  333 graduates, completed  the Work Readiness Skills Scale. This scale was validated as a one-factor model with  an  alpha  coeffcient of  0.88. Oral  and written  communication,  self-discipline,  time management, interpersonal skills and teamwork, problem-solving skills and positive work ethic were rated as important skills for securing employment in this sector by employers and graduates alike. In addition, employers valued numeracy skills and motivation, whereas graduates regarded confidence and  leadership skills as  important. The results have implications for the curriculum design of the Fasset Work Readiness Programme presented to graduates in this industry.

  19. Definition, technology readiness, and development cost of the orbit transfer vehicle engine integrated control and health monitoring system elements

    Science.gov (United States)

    Cannon, I.; Balcer, S.; Cochran, M.; Klop, J.; Peterson, S.

    1991-01-01

    An Integrated Control and Health Monitoring (ICHM) system was conceived for use on a 20 Klb thrust baseline Orbit Transfer Vehicle (OTV) engine. Considered for space used, the ICHM was defined for reusability requirements for an OTV engine service free life of 20 missions, with 100 starts and a total engine operational time of 4 hours. Functions were derived by flowing down requirements from NASA guidelines, previous OTV engine or ICHM documents, and related contracts. The elements of an ICHM were identified and listed, and these elements were described in sufficient detail to allow estimation of their technology readiness levels. These elements were assessed in terms of technology readiness level, and supporting rationale for these assessments presented. The remaining cost for development of a minimal ICHM system to technology readiness level 6 was estimated. The estimates are within an accuracy range of minus/plus 20 percent. The cost estimates cover what is needed to prepare an ICHM system for use on a focussed testbed for an expander cycle engine, excluding support to the actual test firings.

  20. OSART Guidelines. 2015 Edition. Reference Report for IAEA Operational Safety Review Teams (OSARTs)

    International Nuclear Information System (INIS)

    2016-01-01

    The IAEA works to provide a global nuclear safety and security framework for the protection of people and the environment from the effects of ionizing radiation, the minimization of the likelihood of accidents that could endanger life and property, and effective mitigation of the effects of any such events, should they occur. The strategic approach to achieving such a framework involves continual improvement in four areas: national and international safety infrastructures; the establishment and global acceptance of IAEA safety standards; an integrated approach to the provision for the application of the safety standards; and a global network of knowledge and experience. The IAEA Operational Safety Review Team (OSART) programme provides advice and assistance to Member States to enhance the safety of nuclear power plants during commissioning and operation. The OSART programme, initiated in 1982, is available to all Member States with nuclear power plants under commissioning or in operation. Conservative design, careful manufacture and sound construction are all prerequisites for the safe operation of nuclear power plants. However, the safety of the plant also depends ultimately on: sound management, policies, procedures, processes and practices; the capability and reliability of commissioning and operating personnel; comprehensive instructions; sound accident management and emergency preparedness; and adequate resources. Finally, a positive attitude and conscientiousness on the part of all staff in discharging their responsibilities is important to safety. The OSART programme is based on the safety standards applicable to nuclear power plants. IAEA safety standards reflect the consensus of Member States on nuclear safety matters. The reports of the International Nuclear Safety Group identify important current nuclear safety issues and also serve as references during an OSART review. The publication OSART Guidelines provides overall guidance on the conduct of OSART

  1. Accountable care organization readiness and academic medical centers.

    Science.gov (United States)

    Berkowitz, Scott A; Pahira, Jennifer J

    2014-09-01

    As academic medical centers (AMCs) consider becoming accountable care organizations (ACOs) under Medicare, they must assess their readiness for this transition. Of the 253 Medicare ACOs prior to 2014, 51 (20%) are AMCs. Three critical components of ACO readiness are institutional and ACO structure, leadership, and governance; robust information technology and analytic systems; and care coordination and management to improve care delivery and health at the population level. All of these must be viewed through the lens of unique AMC mission-driven goals.There is clear benefit to developing and maintaining a centralized internal leadership when it comes to driving change within an ACO, yet there is also the need for broad stakeholder involvement. Other important structural features are an extensive primary care foundation; concomitant operation of a managed care plan or risk-bearing entity; or maintaining a close relationship with post-acute-care or skilled nursing facilities, which provide valuable expertise in coordinating care across the continuum. ACOs also require comprehensive and integrated data and analytic systems that provide meaningful population data to inform care teams in real time, promote quality improvement, and monitor spending trends. AMCs will require proven care coordination and management strategies within a population health framework and deployment of an innovative workforce.AMC core functions of providing high-quality subspecialty and primary care, generating new knowledge, and training future health care leaders can be well aligned with a transition to an ACO model. Further study of results from Medicare-related ACO programs and commercial ACOs will help define best practices.

  2. Capture ready fossil fuel plants: a critical stage in tackling climate change

    Energy Technology Data Exchange (ETDEWEB)

    Gibbins, J.; Jia Li; Xi Liang [Imperial College, London (United Kingdom). Energy Technology for Sustainable Development Group

    2006-07-01

    Ways in which gasification-based systems can approach the CO{sub 2} capture ready ideal is discussed, together with possible methods for assessing the optimum degree of capture readiness. A key technology choice for power plants is whether or not to incorporate a shift before capture. Financial returns for making plants capture ready are also discussed. 10 refs., 3 tabs.

  3. Mental readiness for maritime international operation: procedures developed by Norwegian navy

    OpenAIRE

    Sanden, Sverre; Johnsen, Bjørn Helge; Eid, Jarle; Pettersen, Jan Sommerfelt; Koefoed, Vilhelm F; Størksen, Roar; Røsseland, Atle; Neteland, Hans Olav; Wetteland, Per Inge; Wilhelmsen, Eirik Veum

    2014-01-01

    Seafarer’s mental health is vital for a well-functioning organisation. Neglecting mental health status on board could be extremely costly for both the crew affected as well as the company. The present article outlines an extensive programme implemented in the Royal Norwegian Navy for personnel deployed in international operations. The challenges involved in international operations bare similarities to onboard personnel in civilian maritime operations. The program utilised by the Royal Norweg...

  4. Measuring Success: Metrics that Link Supply Chain Management to Aircraft Readiness

    National Research Council Canada - National Science Library

    Balestreri, William

    2002-01-01

    ..., The Theory of Constraints proved to be a viable tool for establishing aircraft readiness as the ultimate goal of Marine Corps aviation logistics, and provided a means for identifying and eliminating readiness...

  5. Reflections on e-Learning Readiness in Albanian Education

    Directory of Open Access Journals (Sweden)

    Ezmolda Barolli

    2009-01-01

    Full Text Available Nowadays e-Learning has been identified to be the future of learning worldwide since the very powerful platform of the Internet has accelerated the speed of communication. Adoption of e-learning has become the latest trend across universities all over the world. Albania is part of a global shift from material resources to knowledge and intellectual resources as the basis for economic growth. Educators across Albania are aware that students must have an education that enables the students to participate successfully in and contribute to the knowledge economy. E-Learning readiness is an initial part of e- Learning development. In order to benefit from e-learning, higher education institutions in Albania should conduct considerable up-front analysis to assess their readiness. In this paper we are trying to examine the status of e-Learning readiness in Albania, analyzing and discussing several components and criteria based on literature.

  6. Organizational readiness for implementing change: a psychometric assessment of a new measure.

    Science.gov (United States)

    Shea, Christopher M; Jacobs, Sara R; Esserman, Denise A; Bruce, Kerry; Weiner, Bryan J

    2014-01-10

    Organizational readiness for change in healthcare settings is an important factor in successful implementation of new policies, programs, and practices. However, research on the topic is hindered by the absence of a brief, reliable, and valid measure. Until such a measure is developed, we cannot advance scientific knowledge about readiness or provide evidence-based guidance to organizational leaders about how to increase readiness. This article presents results of a psychometric assessment of a new measure called Organizational Readiness for Implementing Change (ORIC), which we developed based on Weiner's theory of organizational readiness for change. We conducted four studies to assess the psychometric properties of ORIC. In study one, we assessed the content adequacy of the new measure using quantitative methods. In study two, we examined the measure's factor structure and reliability in a laboratory simulation. In study three, we assessed the reliability and validity of an organization-level measure of readiness based on aggregated individual-level data from study two. In study four, we conducted a small field study utilizing the same analytic methods as in study three. Content adequacy assessment indicated that the items developed to measure change commitment and change efficacy reflected the theoretical content of these two facets of organizational readiness and distinguished the facets from hypothesized determinants of readiness. Exploratory and confirmatory factor analysis in the lab and field studies revealed two correlated factors, as expected, with good model fit and high item loadings. Reliability analysis in the lab and field studies showed high inter-item consistency for the resulting individual-level scales for change commitment and change efficacy. Inter-rater reliability and inter-rater agreement statistics supported the aggregation of individual level readiness perceptions to the organizational level of analysis. This article provides evidence in

  7. Determining registered nurses' readiness for evidence-based practice.

    Science.gov (United States)

    Thiel, Linda; Ghosh, Yashowanto

    2008-01-01

    As health care systems worldwide move toward instituting evidence-based practice (EBP), its implementation can be challenging. Conducting a baseline assessment to determine nurses' readiness for EBP presents opportunities to plan strategies before implementation. Although a growing body of research literature is focused on implementing EBP, little attention has been paid to assessing nurses' readiness for EBP. The purpose of this study was to assess registered nurses' readiness for EBP in a moderate-sized acute care hospital in the Midwestern United States before implementation of a hospital-wide nursing EBP initiative. A descriptive cross-sectional survey design was used; 121 registered nurses completed the survey. The participants (n= 121) completed the 64-item Nurses' Readiness for Evidence-Based Practice Survey that allowed measurement of information needs, knowledge and skills, culture, and attitudes. Data were analyzed using descriptive statistics and a post hoc analysis. The majority (72.5%) of respondents indicated that when they needed information, they consulted colleagues and peers rather than using journals and books; 24% of nurses surveyed used the health database, Cumulative Index to Nursing & Allied Health Literature (CINAHL). The respondents perceived their EBP knowledge level as moderate. Cultural EBP scores were moderate, with unit scores being higher than organizational scores. The nurses' attitudes toward EBP were positive. The post hoc analysis showed many significant correlations. Nurses have access to technological resources and perceive that they have the ability to engage in basic information gathering but not in higher level evidence gathering. The elements important to EBP such as a workplace culture and positive attitudes are present and can be built upon. A "site-specific" baseline assessment provides direction in planning EBP initiatives. The Nurses' Readiness for EBP Survey is a streamlined tool with established reliability and

  8. The nutritional content and cost of supermarket ready-meals. Cross-sectional analysis.

    Science.gov (United States)

    Remnant, Jennifer; Adams, Jean

    2015-09-01

    Over-reliance on convenience foods, including ready-meals, has been suggested as one contributor to obesity. Little research has systematically explored the nutritional content of supermarket ready-meals. We described the nutritional content and cost of UK supermarket ready-meals. We conducted a survey of supermarket own-brand chilled and frozen ready-meals available in branches of ten national supermarket chains in one city in northern England. Data on price, weight and nutritional content of meals in four ranges ('healthier', luxury, economy and standard) and of six types (macaroni cheese, meat lasagne, cottage pie, chicken tikka masala, fish pie, and sweet and sour chicken) were collected. Nutritional content was compared to ranges used to identify low, medium and high fat, saturated fat, sugar and salt in nationally recommended front-of-pack labelling. 166 ready-meals were included from 41 stores. Overall, ready-meals were high in saturated fat and salt, and low in sugar. One-fifth of meals were low in fat, saturated fat, salt and sugar, including two-thirds of 'healthier' meals. Meals that were low for three out of the four front-of-pack nutrients were the cheapest. Supermarket ready-meals do not have a healthful nutritional profile overall. However, a number of healthier meals were available - particularly amongst meals specifically marked as 'healthier'. There was little evidence that healthier meals necessarily cost more. Further effort is required to encourage producers to improve the nutritional profile of the full range of ready-meals, and not just those specifically labelled as 'healthier'. Copyright © 2015 The Authors. Published by Elsevier Ltd.. All rights reserved.

  9. The nutritional content and cost of supermarket ready-meals. Cross-sectional analysis☆

    Science.gov (United States)

    Remnant, Jennifer; Adams, Jean

    2015-01-01

    Background: Over-reliance on convenience foods, including ready-meals, has been suggested as one contributor to obesity. Little research has systematically explored the nutritional content of supermarket ready-meals. We described the nutritional content and cost of UK supermarket ready-meals. Methods: We conducted a survey of supermarket own-brand chilled and frozen ready-meals available in branches of ten national supermarket chains in one city in northern England. Data on price, weight and nutritional content of meals in four ranges (‘healthier’, luxury, economy and standard) and of six types (macaroni cheese, meat lasagne, cottage pie, chicken tikka masala, fish pie, and sweet and sour chicken) were collected. Nutritional content was compared to ranges used to identify low, medium and high fat, saturated fat, sugar and salt in nationally recommended front-of-pack labelling. Results: 166 ready-meals were included from 41 stores. Overall, ready-meals were high in saturated fat and salt, and low in sugar. One-fifth of meals were low in fat, saturated fat, salt and sugar, including two-thirds of ‘healthier’ meals. Meals that were low for three out of the four front-of-pack nutrients were the cheapest. Conclusions: Supermarket ready-meals do not have a healthful nutritional profile overall. However, a number of healthier meals were available – particularly amongst meals specifically marked as ‘healthier’. There was little evidence that healthier meals necessarily cost more. Further effort is required to encourage producers to improve the nutritional profile of the full range of ready-meals, and not just those specifically labelled as ‘healthier’. PMID:25963106

  10. Effects of Preschool Intervention Strategies on School Readiness in Kindergarten

    Science.gov (United States)

    Ma, Xin; Nelson, Regena F.; Shen, Jianping; Krenn, Huilan Y.

    2015-01-01

    Using hierarchical linear modeling, the present study aimed to examine whether targeted intervention strategies implemented individually during a preschool program exhibited any short-term and long-term effects on children's school readiness in kindergarten, utilizing data gathered through the Supporting Partnerships to Assure Ready Kids (SPARK)…

  11. Emotional Intelligence as a Determinant of Readiness for Online Learning

    Science.gov (United States)

    Buzdar, Muhammad Ayub; Ali, Akhtar; Tariq, Riaz Ul Haq

    2016-01-01

    Students' performance in online learning environments is associated with their readiness to adopt a digital learning approach. Traditional concept of readiness for online learning is connected with students' competencies of using technology for learning purposes. We in this research, however, investigated psychometric aspects of students'…

  12. Organizational e-readiness web: a model for evaluating e-readiness of Iranian commercial banks in order to develop e-banking

    OpenAIRE

    Chitsazan, Hasti; Keimasi, Masoud

    2015-01-01

    E-banking through mutual benefits for customers and banks has become a necessity in the banking industry nowadays. In spite of this, e-banking has not spread in Iran as it is appropriate.In a general categorization it can be said that E-readiness of banks and environmental e-readiness are two effective factors on development of e-banking which have been referred in different studies some models have been proposed in this regard in macro industries and others. However, no specific model has be...

  13. Operative Versus Non-operative Treatment of Grade III Acromioclavicular Joint Dislocations and the Use of SurgiLig: a Retrospective Review.

    Science.gov (United States)

    Younis, Fizan; Ajwani, Sanil; Bibi, Asia; Riley, Eleanor; Hughes, Peter J

    2017-12-30

    Acromioclavicular joint dislocations are common shoulder girdle injuries. The treatment of grade III acromioclavicular joint dislocations is controversial. Furthermore, the literature on the use of the Sur-giligTM synthetic ligament for reconstruction of dislocations is sparse. This retrospective review aimed to establish whether operative treatment was superior to non-operative treatment in grade III acromioclavicular joint dislocations treated at our institute over a 5-year period. We also reviewed the effectiveness of reconstruction with SurgiligTM after acute and chronic dislocations across all grades of acromioclavicular joint dislocations. Twenty-five patients completed full follow-up with grade III dislocations. The mean follow-up in the operated group was 3.56 years and in the non-operated group this was 3.29 years. The mean Oxford Shoul-der Score (OSS) in the operated group was 39.8, whereas the mean OSS in the non-operated group was 45.9 (p=0.01). The mean pain score in the operated group was 2.2, and in the non-operated group this was 1.6. The mean satisfaction score in the operated group was 8.2 and that in the non-operated group was 7.8. There was no statistically significant difference in pain or satisfaction scores. In respect to the cohort treated with Surg-iligTM synthetic ligament, 22 patients across all grades of dislocations had this procedure performed. The mean post-operative Oxford Shoulder Score (OSS) was 40. 1. Non-operative treatment is not inferior to operative treatment for grade III acromioclavicular joint dislocations. The data from this study demonstrat-ed that the non-operated group had superior Ox-ford Shoul-der Scores that were statistically significant. 2. Additionally, the use of the SurgiligTM ligament appears to be effective in treating both chronic and acute acromioclavicular joint dislocations.

  14. IAEA-led Operational Safety Team Reviews Dukovany Nuclear Power Plant, Czech Republic

    International Nuclear Information System (INIS)

    2011-01-01

    Full text: An international team of nuclear installation safety experts, led by the International Atomic Energy Agency (IAEA), has commended the Dukovany Nuclear Power Plant (NPP) in the Czech Republic for its safety practices and has also made a series of recommendations to reinforce them. The IAEA assembled an international team of experts at the request of the Government of the Czech Republic to conduct an Operational Safety Review (OSART) of Dukovany NPP. Under the leadership of the IAEA's Division of Nuclear Installation Safety in Vienna, the OSART team performed an in-depth operational safety review of the plant from 6 to 23 June 2011. The team was made up of experts from Armenia, Germany, Hungary, Romania, Slovenia, Sweden, the UK and the USA. An OSART mission is designed as a review of programmes and activities essential to operational safety. It is not a regulatory inspection, nor is it a design review or a substitute for an exhaustive assessment of the plant's overall safety status. The team at Dukovany conducted an in-depth review of the aspects essential to the safe operation of the NPP, which is largely under the control of the site management. The conclusions of the review are based on the IAEA's Safety Standards and proven good international practices. The review covered the areas of Management, Organization and Administration; Training and Qualification; Operations; Maintenance; Technical Support; Operating Experience; Radiation Protection; Chemistry; and Emergency Planning and Preparedness. The OSART team has identified good plant practices, which will be shared with the rest of the nuclear industry for consideration of their application. Examples include: The plant uses an integrated approach to recruit, select, psychologically assess and train new employees. This approach has resulted in consistently high success rates for licensed operator examinations and the identification of potential candidates for various plant departments; The performance

  15. K-Reactor readiness

    International Nuclear Information System (INIS)

    Rice, P.D.

    1991-01-01

    This document describes some of the more significant accomplishments in the reactor restart program and details the magnitude and extent of the work completed to bring K-Reactor to a state of restart readiness. The discussion of restart achievements is organized into the three major categories of personnel, programs, and plant. Also presented is information on the scope and extent of internal and external oversight of the efforts, as well as some details on the startup plan

  16. Enhancing Mental Readiness in Military Personnel

    National Research Council Canada - National Science Library

    Thompson, Megan M; McCreary, Donald R

    2006-01-01

    In this paper we explore how the psychological literature on stress and coping might inform military training programs to enhance "mental readiness" as a method to develop the baseline psychological...

  17. Delayed gastrointestinal recovery after abdominal operation – role of alvimopan

    Directory of Open Access Journals (Sweden)

    Berger NG

    2015-08-01

    Full Text Available Nicholas G Berger, Timothy J Ridolfi, Kirk A LudwigDivision of Colorectal Surgery, Department of Surgery, Medical College of Wisconsin, Milwaukee, Wisconsin USAAbstract: Postoperative Ileus (POI, which occurs after surgical manipulation of the bowel during abdominal operations, is associated with prolonged hospital stay, increasing medical costs, and delayed advancement of enteral diet, which contributes to a significant economic burden on the healthcare system. The use of accelerated care pathways has shown to positively impact gut function, but inevitable postoperative opioid use contributes to POI. Alvimopan is a peripherally acting µ-opioid receptor antagonist designed to mitigate antimotility effects of opioids. In our review, we examined ten trials on alvimopan's use after abdominal operations. Several of the earlier studies on patients undergoing bowel resection showed correlations between the study group and GI recovery as defined by passage of flatus, first bowel movement, and time to readiness for discharge. Data in patients undergoing total abdominal hysterectomy showed similarly decreased GI recovery time. Additionally, data within the past few years shows alvimopan is associated with more rapid GI recovery time in patients undergoing radical cystectomy. Based on our review, use of alvimopan remains a safe and potentially cost-effective means of reducing POI in patients following open GI surgery, radical cystectomy, and total abdominal hysterectomy, and should be employed following these abdominal operations.Keywords: postoperative ileus, alvimopan, ileus, bowel resection, return of bowel function

  18. AECB staff review of Bruce NGS 'A' operation for the year 1988

    International Nuclear Information System (INIS)

    1989-05-01

    AECB project staff believes that overall performance of the station in 1988 was generally satisfactory and better than in 1987. However, this assessment is not supported by some of the key performance indicators, although the indicators in areas where AECB staff had specific concerns do support it. For example, the percentage of reported significant events attributable to human error, the number of operating memos beyond the review date, scheduled emergency drills completed, the number of completed reactor trips all show a significant improvement over the 1987 value. In addition, AECB staff has been encouraged by the licensee's implementation of effective review processes for operator and maintenance call-ups, routines and deficiencies, and the establishment of supervisor inspection tours and operator rounds programs. Nevertheless, it is the opinion of AECB staff that to achieve standards of operation which would be considered fully satisfactory, the backlog of maintenance work must be reduced, the quality of work performed in the plant improved, and assurance provided that the required quality standards are being consistently achieved and maintained

  19. Energy and water quality management systems for water utility's operations: a review.

    Science.gov (United States)

    Cherchi, Carla; Badruzzaman, Mohammad; Oppenheimer, Joan; Bros, Christopher M; Jacangelo, Joseph G

    2015-04-15

    Holistic management of water and energy resources is critical for water utilities facing increasing energy prices, water supply shortage and stringent regulatory requirements. In the early 1990s, the concept of an integrated Energy and Water Quality Management System (EWQMS) was developed as an operational optimization framework for solving water quality, water supply and energy management problems simultaneously. Approximately twenty water utilities have implemented an EWQMS by interfacing commercial or in-house software optimization programs with existing control systems. For utilities with an installed EWQMS, operating cost savings of 8-15% have been reported due to higher use of cheaper tariff periods and better operating efficiencies, resulting in the reduction in energy consumption of ∼6-9%. This review provides the current state-of-knowledge on EWQMS typical structural features and operational strategies and benefits and drawbacks are analyzed. The review also highlights the challenges encountered during installation and implementation of EWQMS and identifies the knowledge gaps that should motivate new research efforts. Copyright © 2015 Elsevier Ltd. All rights reserved.

  20. PROSPER guidelines: Guidelines for peer review and for plant self-assessment of operational experience feedback process

    International Nuclear Information System (INIS)

    2003-01-01

    Effective use of operational performance information is an important element in any plant operator's arrangements for enhancing the operational safety of a nuclear power plant (NPP). This has been recognized in the IAEA Safety Fundamental, The Safety of Nuclear Installations (Safety Series No. 110). Under the technical aspects of safety, one of the principles of operation and maintenance is that the operating organization and the regulatory body shall establish complementary programmes to analyse operating experience to ensure that lessons are learned and acted upon. Such experience shall be shared with relevant national and international bodies. The Convention on Nuclear Safety, which entered into force in July 1996, also recognized the importance of operational experience feedback as a tool of high importance for the safety of nuclear plant operation and its further enhancement. It follows that the arrangements and results achieved under the operation experience feedback process in Member States will be covered by the national report under the Convention and will be subject to periodical review. These principles are further expanded in the IAEA Safety Standards Safety of Nuclear Power Plants: Operation (Safety Standard Series No. NS-R-2, year 2000) under the Feedback of The IAEA-led Peer Review of the effectiveness of the Operational Safety Performance Experience Review process (PROSPER) and associated guidelines have been developed to provide advice and assistance to utilities or individual power plants to strengthen and enhance the effectiveness of operational experience programmes in achieving these fundamental objectives. The objectives of the former IAEA Assessment of Significant Safety Events Team (ASSET) service have been expanded to include an evaluation of the effective use of all operating performance information available to the plant (e.g. external operating experience, internal low-level and near miss event reports and other relevant operating

  1. The BERG faculty students readiness for information technologies study

    Directory of Open Access Journals (Sweden)

    Horovèák Pavel

    2002-12-01

    Full Text Available The contribution deals with the reconnaissance of our students’ readiness to study information technologies, its interpretation, comparison with some published data as well as with a completion and evaluation of the reconnaissance. It specifies methods and processes of evaluation, structure, sections and questions of the reconnaissance. The reconnaissance was oriented particularly to the evaluation of knowledge in the information technologies area acquired at secondary schools. It was completed in a classical paper form as a preparation for the realization and utilization of questionnaire in the electronic form. The following is constructed using modern internet and database technologies and presents extensive possibilities of evaluation answers respondents. The results of the reconnaissance are presented in the form distribution (sex, domicile, secondary school, secondary school influence, work with a computer, operating and exploitation of internet technologies, familiarity with operating systems and typical applications software and programming languages as well as the interest in information technologies of respondents. The results are compared with some other published data and future perspectives of completion and its evaluation of completion are outlined.

  2. Microbiological Quality Assessment of Ready-To-Eat Kilishi Sold in ...

    African Journals Online (AJOL)

    Microbiological Quality Assessment of Ready-To-Eat Kilishi Sold in Abuja, Nigeria. ... Animal Production Research Advances ... A total of twelve samples of ready-to-eat dried meat product, kilishi, were purchased from different sale-points in Abuja, Nigeria and a study conducted on them to assess their microbiological ...

  3. 'Ready-access' CT imaging for an orthopaedic trauma clinic.

    LENUS (Irish Health Repository)

    Cawley, D

    2011-03-01

    \\'Ready-Access\\' to CT imaging facilities in Orthopaedic Trauma Clinics is not a standard facility. This facility has been available at the regional trauma unit, in Merlin Park Hospital, Galway for the past four years. We reviewed the use of this facility over a 2-year period when 100 patients had CT scans as part of their trauma clinic assessment. The rate of CT scan per clinic was 0.6. The mean waiting time for a CT scan was 30 minutes. 20 (20%) new fractures were confirmed, 33 (33%) fractures were out-ruled, 25 (25%) fractures demonstrated additional information and 8 (8%) had additional fractures. 20 (20%) patients were discharged and 12 (12%) patients were admitted as a result of the CT scan. It adds little time and cost to CT scanning lists.

  4. Onderzoek online readiness modezaken 2012

    NARCIS (Netherlands)

    Boels, Han; Weltevreden, Jesse

    2013-01-01

    In dit onderzoek is de online readiness van modezaken in 2012 in kaart gebracht. In totaal hebben 124 (voornamelijk zelfstandige) modezaken deelgenomen aan het onderzoek. Het onderzoek is uitgevoerd door het lectoraat Online Ondernemen samen met studenten van de minor Marketing Tomorrow van de

  5. Onderzoek online readiness rijscholen 2013

    NARCIS (Netherlands)

    Weltevreden, Jesse; Boels, Han

    2013-01-01

    In dit onderzoek is de online readiness van rijscholen in 2013 in kaart gebracht. In totaal hebben 115 rijscholen deelgenomen aan het onderzoek. Het onderzoek is uitgevoerd door het lectoraat Online Ondernemen samen met studenten van de minor Marketing Tomorrow van de Hogeschool van Amsterdam.

  6. Remedial action and waste disposal project: 100-B/C remedial action readiness report

    International Nuclear Information System (INIS)

    April, J.G.; Bryant, D.L.; Cislo, G.B.

    1996-07-01

    This Readiness Evaluation Report presents the results of the project readiness evaluation to assess the readiness of the 100-B/C source sites remediation. The 100-B/C Area is located at the Hanford Site in Richland, Washington. The evaluation was conducted at the conclusion of a series of readiness activities that began in May 1996. These activities included confirming the completion of project specific procedures, training of staff, obtaining support equipment, receipt of subcontractor submittals, approval of subcontractor submittals, and mobilization and construction of site support systems

  7. A Harmonized Process Model for Digital Forensic Investigation Readiness

    OpenAIRE

    Valjarevic , Aleksandar; Venter , Hein

    2013-01-01

    Part 2: FORENSIC MODELS; International audience; Digital forensic readiness enables an organization to prepare itself to perform digital forensic investigations in an efficient and effective manner. The benefits include enhancing the admissibility of digital evidence, better utilization of resources and greater incident awareness. However, a harmonized process model for digital forensic readiness does not currently exist and, thus, there is a lack of effective and standardized implementations...

  8. DISPOSABLE DIAPER IMPACT THE TODDLER’S TOILET TRAINING READINESS

    Directory of Open Access Journals (Sweden)

    Yuni Sufyanti Arief

    2017-07-01

    Full Text Available Introduction : Toilet training is an important developmental milestone in every child’s life. The children who wear cloth diapers than disposable diaper are out of diaper 12 months earlier because they can feel the wetness when they urinate. Kinds of underwear may facilitate the development of toileting skill. The objective of this study was to learn differentiation about toilet training practised between the toddler who ever wear disposable diaper and the toddler who never wear disposable diaper. Method : This study used case control design. Population was consist of 45 toddler in 24-36 month old. The samples were 34 respondents, 21 toddler as 1st group  who ever wear disposable diaper and 13 toddler as 2nd group who never one, taken according to inclusion criteria. The independent variables were wear disposable diaper and never one. The dependent variable was toilet training practised such as the toileting skill of toddler, method of toilet training by the parent, toddler readiness to start toilet training and the parents and environment readiness to start toilet training for toddler. Data were taken by using questionnaire and analysed using Mann Whitney test with significance level of  α<0.05. Result : The result showed that there was no differentiation about the toileting skill of toddler (p=0.631, method of toilet training (p=0.249, and the parents and environment readiness to start toilet training (p=0.207 between the groups. There was differentiation about the toddler readiness to start toilet training between the groups with significance level p=0.000. Analysis : It can be concluded that there are no differentiation about the toilet training practiced beetwen the groups. Discussion : Disposable diaper has influences in the toddler readiness to start toilet training. It has no influences in the toileting skill of toddler, method of toilet training by the parent, and the parents and environment readiness to start toilet training.

  9. Consumer behaviors towards ready-to-eat foods based on food-related lifestyles in Korea.

    Science.gov (United States)

    Bae, Hyun-Joo; Chae, Mi-Jin; Ryu, Kisang

    2010-08-01

    The purpose of this study was to examine consumers' behaviors toward ready-to-eat foods and to develop ready-to-eat food market segmentation in Korea. The food-related lifestyle and purchase behaviors of ready-to-eat foods were evaluated using 410 ready-to-eat food consumers in the Republic of Korea. Four factors were extracted by exploratory factor analysis (health-orientation, taste-orientation, convenience-orientation, and tradition-orientation) to explain the ready-to eat food consumers' food-related lifestyles. The results of cluster analysis indicated that "tradition seekers" and "convenience seekers" should be regarded as the target segments. Chi-square tests and t-tests of the subdivided groups showed there were significant differences across marital status, education level, family type, eating-out expenditure, place of purchase, and reason for purchase. In conclusion, the tradition seekers consumed more ready-to-eat foods from discount marts or specialty stores and ate them between meals more often than the convenience seekers. In contrast, the convenience seekers purchased more ready-to-eat foods at convenience stores and ate them as meals more often than the tradition seekers. These findings suggest that ready-to-eat food market segmentation based on food-related lifestyles can be applied to develop proper marketing strategies.

  10. Consumer behaviors towards ready-to-eat foods based on food-related lifestyles in Korea

    Science.gov (United States)

    Bae, Hyun-Joo; Chae, Mi-Jin

    2010-01-01

    The purpose of this study was to examine consumers' behaviors toward ready-to-eat foods and to develop ready-to-eat food market segmentation in Korea. The food-related lifestyle and purchase behaviors of ready-to-eat foods were evaluated using 410 ready-to-eat food consumers in the Republic of Korea. Four factors were extracted by exploratory factor analysis (health-orientation, taste-orientation, convenience-orientation, and tradition-orientation) to explain the ready-to eat food consumers' food-related lifestyles. The results of cluster analysis indicated that "tradition seekers" and "convenience seekers" should be regarded as the target segments. Chi-square tests and t-tests of the subdivided groups showed there were significant differences across marital status, education level, family type, eating-out expenditure, place of purchase, and reason for purchase. In conclusion, the tradition seekers consumed more ready-to-eat foods from discount marts or specialty stores and ate them between meals more often than the convenience seekers. In contrast, the convenience seekers purchased more ready-to-eat foods at convenience stores and ate them as meals more often than the tradition seekers. These findings suggest that ready-to-eat food market segmentation based on food-related lifestyles can be applied to develop proper marketing strategies. PMID:20827350

  11. DES Science Portal: II- Creating Science-Ready Catalogs

    Energy Technology Data Exchange (ETDEWEB)

    Fausti Neto, Angelo; et al.

    2017-08-18

    We present a novel approach for creating science-ready catalogs through a software infrastructure developed for the Dark Energy Survey (DES). We integrate the data products released by the DES Data Management and additional products created by the DES collaboration in an environment known as DES Science Portal. Each step involved in the creation of a science-ready catalog is recorded in a relational database and can be recovered at any time. We describe how the DES Science Portal automates the creation and characterization of lightweight catalogs for DES Year 1 Annual Release, and show its flexibility in creating multiple catalogs with different inputs and configurations. Finally, we discuss the advantages of this infrastructure for large surveys such as DES and the Large Synoptic Survey Telescope. The capability of creating science-ready catalogs efficiently and with full control of the inputs and configurations used is an important asset for supporting science analysis using data from large astronomical surveys.

  12. Review of Issues Associated with Safe Operation and Management of the Space Shuttle Program

    Science.gov (United States)

    Johnstone, Paul M.; Blomberg, Richard D.; Gleghorn, George J.; Krone, Norris J.; Voltz, Richard A.; Dunn, Robert F.; Donlan, Charles J.; Kauderer, Bernard M.; Brill, Yvonne C.; Englar, Kenneth G.; hide

    1996-01-01

    At the request of the President of the United States through the Office of Science and Technology Policy (OSTP), the NASA Administrator tasked the Aerospace Safety Advisory Panel with the responsibility to identify and review issues associated with the safe operation and management of the Space Shuttle program arising from ongoing efforts to improve and streamline operations. These efforts include the consolidation of operations under a single Space Flight Operations Contract (SFOC), downsizing the Space Shuttle workforce and reducing costs of operations and management. The Panel formed five teams to address the potentially significant safety impacts of the seven specific topic areas listed in the study Terms of Reference. These areas were (in the order in which they are presented in this report): Maintenance of independent safety oversight; implementation plan for the transition of Shuttle program management to the Lead Center; communications among NASA Centers and Headquarters; transition plan for downsizing to anticipated workforce levels; implementation of a phased transition to a prime contractor for operations; Shuttle flight rate for Space Station assembly; and planned safety and performance upgrades for Space Station assembly. The study teams collected information through briefings, interviews, telephone conversations and from reviewing applicable documentation. These inputs were distilled by each team into observations and recommendations which were then reviewed by the entire Panel.

  13. Validation of Transition Readiness Assessment Questionaire in Turkish Adolescents with Diabetes

    Directory of Open Access Journals (Sweden)

    Evrim Kızıler

    2018-02-01

    Full Text Available Background: Today, more than 90% of adolescents with chronic conditions survive into adulthood and move from pediatric care to adult care for the management of their chronic illness. It is important to grant autonomy and ensure that adolescents/young adults are ready to use the adult health care system prior to the transfer of care. However, the lack of a transition readiness assessment tool that is validated, patient-centered, and appropriate to developmental differences in pediatric care is a major obstacle for the transition of care from pediatric services to adult services. Aims: This study examined the validity and reliability of the Turkish version of the Transition Readiness Assessment Questionnaire, which assesses the readiness for transition from pediatric to adult health care for adolescents/young adults with diabetes mellitus. Study Design: Methodological study. Methods: Participants were 109 adolescents/young adults with type 1 diabetes mellitus aged 14-21 years. After permission was obtained to adapt the Transition Readiness Assessment Questionnaire, the Turkish Transition Readiness Assessment Questionnaire and self-care scale were administered to participants through face-to-face interviews at two pediatric endocrinology clinics. Validity was evaluated by exploratory and confirmatory factor analysis and content-scope validity assessment; reliability was evaluated by item-total score correlation and continuity methods. Internal reliability was assessed by Cronbach’s alpha coefficient and criterion validity assessment. Results: The item analysis, exploratory factor analysis, and confirmatory factor analysis identified five basic dimensions, with high internal consistency (0.89-0.75. The ratio χ2/df and other conformity indices were a good fit to the data. The correlation coefficient in the analyses of test-retest scores was 0.86 for the total scale (p<0.05, and the Cronbach’s alpha coefficient was 0.88 for overall scale

  14. The Efficiency Potential of ICT in Haulier Operations

    DEFF Research Database (Denmark)

    Sternberg, Henrik; Prockl, Günter; Holmström, Jan

    2014-01-01

    What is the efficiency potential of Information Communication Technology (ICT) in haulier operations? Previous literature has focused on the aggregated level benefits that could be achieved once a large proportion of hauliers have introduced ICT in their trucks. In reality, hauliers are only ready...... to invest in technologies that generate business benefits, yet there is a gap in the literature regarding the linking of technology to the actual efficiency improvement of hauliers. The purpose of this paper is to address this gap and consider the potential of ICT to improve the activities in road freight...... transportation. The focus is on the individual driver, and the level of analysis is the truck and driver activities. We have chosen time as the primary measure of efficiency. We carried out three parallel research steps over a five-year period. The first was a literature review on the potential effects of using...

  15. Assessing Residents' Readiness for OR Autonomy: A Qualitative Descriptive Study of Expert Surgical Teachers' Best Practices.

    Science.gov (United States)

    Chen, Xiaodong Phoenix; Sullivan, Amy M; Alseidi, Adnan; Kwakye, Gifty; Smink, Douglas S

    Providing resident autonomy in the operating room (OR) is one of the major challenges for surgical educators today. The purpose of this study was to explore what approaches expert surgical teachers use to assess residents' readiness for autonomy in the OR. We particularly focused on the assessments that experts make prior to conducting the surgical time-out. We conducted semistructured in-depth interviews with expert surgical teachers from March 2016 to September 2016. Purposeful sampling and snowball sampling were applied to identify and recruit expert surgical teachers from general surgery residency programs across the United States to represent a range of clinical subspecialties. All interviews were audio-recorded, deidentified, and transcribed. We applied the Framework Method of content analysis, discussed and reached final consensus on the themes. We interviewed 15 expert teachers from 9 institutions. The majority (13/15) were Program or Associate Program Directors; 47% (7/15) primarily performed complex surgical operations (e.g., endocrine surgery). Five themes regarding how expert surgical teachers determine residents' readiness for OR autonomy before the surgical time-out emerged. These included 3 domains of evidence elicited about the resident (resident characteristics, medical knowledge, and beyond the current OR case), 1 variable relating to attending characteristics, and 1 variable composed of contextual factors. Experts obtained one or more examples of evidence, and adjusted residents' initial autonomy using factors from the attending variable and the context variable. Expert surgical teachers' assessments of residents' readiness for OR autonomy included 5 key components. Better understanding these inputs can contribute to both faculty and resident development, enabling increased resident autonomy and preparation for independent practice. Copyright © 2017 Association of Program Directors in Surgery. Published by Elsevier Inc. All rights reserved.

  16. Proceedings of the Canadian Gas Association's western operations workshop : readiness : reduce the risk

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-07-01

    The natural gas industry is now facing a number of challenges related to energy infrastructure security and new regulations regarding pipeline and employee safety. Organized by the Canadian Gas Association (CGA), this workshop provided a forum for gas distribution companies, transmission companies, and service providers to discuss issues related to the delivery of natural gas in Canada. While the workshop also included tours and descriptions of specific natural gas facilities and operational centres, several of the breakout sessions during the workshop were used to discuss natural gas technologies and planning procedures related to safety and security. Planning process improvements using risk analysis for operations were discussed. Safety strategies for the 2010 Olympics relating to critical infrastructure protection were reviewed. Issues concerning emergency response preparedness were examined, as well as threats to energy infrastructure from acts of terrorism. Recent innovations in fire retardant clothing were presented. Technological innovations presented at the workshop included a cold weather technology line heater, and new technologies in underground pipe manufacturing. Human resources issues included new approaches to stress management and employee support and safety. The workshop featured 12 breakout sessions, of which 4 have been catalogued separately for inclusion in this database. refs., tabs., figs.

  17. The Naval Aviation Enterprise Type/Model/Series Team and Its Effect on AH-1W Readiness

    Science.gov (United States)

    2012-03-23

    Team Structure 28 9 Current Readiness Process The Current Readiness Process assesses the readiness metrics, or Key Performance Indicators ( KPIs ...CR CFT and the Marine Corps leadership to shift resources to close the gap. Aircraft Readiness Aircraft availability is one of the KPIs that the T...Commandant of Aviation DRRS Defense Readiness Reporting System FMC Full Mission Capable GAO General Accounting Office GSE Ground Support Equipment KPI

  18. THE EFFECTS OF INTERNATIONAL ECONOMIC CRISIS ONTURKISH READY-MADE CLOTHING INDUSTRY

    Directory of Open Access Journals (Sweden)

    Nurgul KILINC

    2012-07-01

    Full Text Available THE EFFECTS OF INTERTextile and ready-made clothing sector is one of the sectors that globalize in anadvanced level due to employment it provides, value-added created by it duringthe manufacturing process and high share in export revenue.In this research, 5 international economiccrisesdetermined since the foundationof theTurkish Republic, Turkish textile and ready-made clothing sector have beenexamined depending on journal archives and export-import data.Economic crises emerged in the world between 1974 and 2008 from whichTurkey has been affected as well have been examined by document analysismethod, which is a qualitative data gathering method in this research.By this research, which has studied international economic crisesoccurredinfragile and vulnerable Turkish economy since 1974 as regards to reason, result,effects and which has aimed to detect their effects on textile and ready-madeclothing sector. It has been realised that textile and ready-made clothing sectorthat is the locomotive sector of export of Turkey is the premier sector of thesectors those are being affected initially and directly from the negativedevelopments inTurkish economy. NATIONAL ECONOMIC CRISIS ONTURKISH READY-MADE CLOTHING INDUSTRY

  19. Assessing students' readiness towards e-learning

    Science.gov (United States)

    Rahim, Nasrudin Md; Yusoff, Siti Hawa Mohd; Latif, Shahida Abd

    2014-07-01

    The usage of e-Learning methodology has become a new attraction for potential students as shown by some higher learning institutions in Malaysia. As such, Universiti Selangor (Unisel) should be ready to embark on e-Learning teaching and learning in the near future. The purpose of the study is to gauge the readiness of Unisel's students in e-Learning environment. A sample of 110 students was chosen to participate in this study which was conducted in January 2013. This sample consisted of students from various levels of study that are foundation, diploma and degree program. Using a structured questionnaire, respondents were assessed on their basic Internet skills, access to technology required for e-Learning and their attitude towards characteristics of successful e-Learning student based on study habits, abilities, motivation and time management behaviour. The result showed that respondents did have access to technology that are required for e-Learning environment, and respondents were knowledgeable regarding the basic Internet skills. The finding also showed that respondents' attitude did meet all characteristics of successful e-Learning student. Further analysis showed that there is no significant relationshipeither among gender, level of study or faculty with those characteristics. As a conclusion, the study shows that current Unisel's students are ready to participate in e-Learning environment if the institution decided to embark on e-Learning methodology.

  20. Preparing Canada's power systems for transition to the year 2000 : Y2K readiness assessment results for Canadian electric utility companies : first quarter 1999

    International Nuclear Information System (INIS)

    1999-01-01

    The effort made by Canadian electric utilities to minimize any power disruptions during the year 2000 (Y2K) transition is discussed and the state of readiness of the electric power industry with respect to the Y2K computer challenge is outlined. Canadian utilities started addressing Y2K issues several years ago, and today, reports show that every major electric utility in Canada is either on, or ahead of schedule to meet the industry established milestones for Y2K readiness. This report includes the assessment of all of Canada's large electric utilities, plus about 95 per cent of Canada's small distribution utilities. On average, the bulk electric utilities in Canada expect to be Y2K ready by mid-June 1999. This means that equipment and systems will operate properly for all dates including Y2K, or that there will be an operating strategy in place to mitigate the effects of any improper operations of equipment or systems. In terms of overall preparations for Y2K, Canada is ahead of the North American averages. Bulk electric utilities for non-nuclear generation are now 100 per cent complete in the inventory phase, 99 per cent complete in the assessment phase, and 91 per cent complete in the remediation/testing phase. For nuclear generation, completion rates are the same except for the remediation/testing phase which is 97 per cent complete. 1 tab., 21 figs

  1. Lessons Learned from Missing Flooding Barriers Operating Experience

    International Nuclear Information System (INIS)

    Simic, Z.; Veira, M. P.

    2016-01-01

    Flooding hazard is highly significant for nuclear power plant safety because of its potential for common cause impact on safety related systems, and because operating experience reviews regularly identify flooding as a cause of concern. Source of the flooding could be external (location) or internal (plant design). The amount of flooding water could vary but even small amount might suffice to affect redundant trains of safety related systems for power supply and cooling. The protection from the flooding is related to the design-basis flood level (DBFL) and it consists of three elements: structural, organizational and accessibility. Determination of the DBFL is critical, as Fukushima Daiichi accident terribly proved. However, as the topic of flooding is very broad, the scope of this paper is focused only on the issues related to the missing flood barriers. Structural measures are physically preventing flooding water to reach or damage safety related system, and they could be permanent or temporary. For temporary measures it is important to have necessary material, equipment and organizational capacity for the timely implementation. Maintenance is important for permanent protection and periodical review is important for assuring readiness and feasibility of temporary flooding protection. Final flooding protection element is assured accessibility to safety related systems during the flooding. Appropriate flooding protection is based on the right implementation of design requirements, proper maintenance and periodic reviews. Operating experience is constantly proving how numerous water sources and systems interactions make flooding protection challenging. This paper is presenting recent related operating experience feedback involving equipment, procedures and analysis. Most frequent deficiencies are: inadequate, degraded or missing seals that would allow floodwaters into safety related spaces. Procedures are inadequate typically because they underestimate necessary

  2. Workplace Readiness for Communicating Diversity.

    Science.gov (United States)

    Muir, Clive

    1996-01-01

    Proposes a model for communicating change about diversity using a workplace-readiness approach. Discusses ways organizational change agents can assess the company's current interpersonal and social dynamics, use appropriate influence strategies, and create effective messages that will appeal to employees and help to achieve the desired acceptance…

  3. A ready-to-use duplex qPCR to detect Leishmania infantum DNA in naturally infected dogs.

    Science.gov (United States)

    Rampazzo, Rita de Cássia Pontello; Solcà, Manuela da Silva; Santos, Liliane Celestino Sales; Pereira, Lais de Novaes; Guedes, José Carlos Oliveira; Veras, Patrícia Sampaio Tavares; Fraga, Deborah Bittencourt Mothé; Krieger, Marco Aurélio; Costa, Alexandre Dias Tavares

    2017-11-15

    has many advantages. By joining two qPCR protocols into one, more results can be obtained in the same amount of time with reduced costs and embedded quality control. Reagents are preloaded and stored on the plate, reducing the operator's hands-on time to set up a reaction, as well as decreasing manipulation steps, which reduces the risk of mistakes or contamination. Thus, the ready-to-use duplex format turns qPCR into a robust, easy-to-use tool, which could help increase the availability of qPCR for CVL diagnosis. Copyright © 2017 Elsevier B.V. All rights reserved.

  4. Health promotion research in active duty army soldiers: The road to a fit and ready force.

    Science.gov (United States)

    McCarthy, Mary S; Elshaw, Evelyn B; Szekely, Barbara M; Pflugeisen, Bethann

    In the last decade the Military Health System has changed its paradigm to focus on health promotion and disease prevention. This paper reviews a decade of research exploring the effects of military life on nutritional status and bone health of Army soldiers. Descriptive and experimental approaches have assessed occupational demands on soldiers in variable environments that require optimal nutrition status and physical health. The prevalence of overweight and obesity in the military has risen dramatically and the implications for health, readiness, productivity, and cost demands attention. The related nutritional deficits such as suboptimal vitamin D status likely contribute to musculoskeletal injuries which have a greater impact on the performance and readiness of soldiers than any other medical condition in peacetime or conflict. The greatest challenge in our system for health is optimizing the performance of all soldiers while minimizing health risks and long-term disability resulting from occupational hazards, particularly those inherent to war. Published by Elsevier Inc.

  5. Manpower Management: No Tiered Readiness - Enabling The Nation’s Force in Readiness

    Science.gov (United States)

    2013-04-09

    readiness. The calculus of effectively pulling resources from the DEP must be driven from the FORCESYNCH, but align to institutional plans. The...physically qualified (medical, dental , panorex) 2,D, D,H,Q Pregnancy (after determination by proper authority) N Postpartum (up to six...months after delivery) Dental Class 3 or 4 Physical Evaluation Board determination R E ADMINISTRATIVE End of active

  6. SMEs and their co-operation with academia.

    Science.gov (United States)

    Antoine, Jean Michel; Strömqvist, Mats

    2005-01-01

    Co-operation between SMEs and Academia can be a win-win situation when each partner understands the constraints of the other. SMEs are often leaders in innovation; therefore more ready to share interest in research. They are flexible and dynamic. They need a short feed-back to sustain their co-operation. Academia is often more long-term oriented and more question- than answer-oriented. A code of conduct can ease the relationship because it can anticipate the potential problems.

  7. Ready, set, stop: mismatch between self-care beliefs, transition readiness skills, and transition planning among adolescents, young adults, and parents.

    Science.gov (United States)

    Sawicki, Gregory S; Kelemen, Skyler; Weitzman, Elissa R

    2014-10-01

    Health care transition (HCT) from pediatric to adult-focused systems is a key milestone for youth. Developing self-care skills and HCT planning are key elements. In a survey at 4 pediatric specialty clinics to 79 youth aged 16 to 25 years and 52 parents, skill-based HCT readiness was assessed using the Transition Readiness Assessment Questionnaire (TRAQ). Multivariable logistic regression evaluated the association between TRAQ scores and self-care beliefs. In all, 70% of youth and 67% of parents believed that they/their child could manage their care. Only 38% of youth and 53% of parents reported thinking about HCT; only 18% of youth and 27% of parents reported having a HCT plan. Youth with higher TRAQ scores were more likely to believe they could manage their care, controlling for age and gender (adjusted odds ratio = 4.0, 95% confidence interval = 1.7-9.5). Transition readiness skills are associated with self-care beliefs. However, a mismatch exists between high reported self-care beliefs and low levels of transition planning. © The Author(s) 2014.

  8. Does oculomotor readiness mediate exogenous capture of visual attention?

    Science.gov (United States)

    MacLean, Gregory H; Klein, Raymond M; Hilchey, Matthew D

    2015-10-01

    The oculomotor readiness hypothesis makes 2 predictions: Shifts in covert attention are accompanied by preparedness to move one's eyes to the attended region, and preparedness to move one's eyes to a region in space is accompanied by a shift in covert attention to the prepared location. Both predictions have been disconfirmed using an endogenous attention task. In the 2 experiments presented here, the same 2 predictions were tested using an exogenous attention task. It was found that participants experienced covert capture without accompanying oculomotor activation and experienced oculomotor activation without accompanying covert capture. While under everyday conditions the overt and covert orienting systems may be strongly linked, apparently they can nonetheless operate with a high degree of independence from one another. (PsycINFO Database Record (c) 2015 APA, all rights reserved).

  9. Measuring organizational readiness for knowledge translation in chronic care.

    Science.gov (United States)

    Gagnon, Marie-Pierre; Labarthe, Jenni; Légaré, France; Ouimet, Mathieu; Estabrooks, Carole A; Roch, Geneviève; Ghandour, El Kebir; Grimshaw, Jeremy

    2011-07-13

    Knowledge translation (KT) is an imperative in order to implement research-based and contextualized practices that can answer the numerous challenges of complex health problems. The Chronic Care Model (CCM) provides a conceptual framework to guide the implementation process in chronic care. Yet, organizations aiming to improve chronic care require an adequate level of organizational readiness (OR) for KT. Available instruments on organizational readiness for change (ORC) have shown limited validity, and are not tailored or adapted to specific phases of the knowledge-to-action (KTA) process. We aim to develop an evidence-based, comprehensive, and valid instrument to measure OR for KT in healthcare. The OR for KT instrument will be based on core concepts retrieved from existing literature and validated by a Delphi study. We will specifically test the instrument in chronic care that is of an increasing importance for the health system. Phase one: We will conduct a systematic review of the theories and instruments assessing ORC in healthcare. The retained theoretical information will be synthesized in a conceptual map. A bibliography and database of ORC instruments will be prepared after appraisal of their psychometric properties according to the standards for educational and psychological testing. An online Delphi study will be carried out among decision makers and knowledge users across Canada to assess the importance of these concepts and measures at different steps in the KTA process in chronic care.Phase two: A final OR for KT instrument will be developed and validated both in French and in English and tested in chronic disease management to measure OR for KT regarding the adoption of comprehensive, patient-centered, and system-based CCMs. This study provides a comprehensive synthesis of current knowledge on explanatory models and instruments assessing OR for KT. Moreover, this project aims to create more consensus on the theoretical underpinnings and the

  10. Measuring organizational readiness for knowledge translation in chronic care

    Directory of Open Access Journals (Sweden)

    Ouimet Mathieu

    2011-07-01

    Full Text Available Abstract Background Knowledge translation (KT is an imperative in order to implement research-based and contextualized practices that can answer the numerous challenges of complex health problems. The Chronic Care Model (CCM provides a conceptual framework to guide the implementation process in chronic care. Yet, organizations aiming to improve chronic care require an adequate level of organizational readiness (OR for KT. Available instruments on organizational readiness for change (ORC have shown limited validity, and are not tailored or adapted to specific phases of the knowledge-to-action (KTA process. We aim to develop an evidence-based, comprehensive, and valid instrument to measure OR for KT in healthcare. The OR for KT instrument will be based on core concepts retrieved from existing literature and validated by a Delphi study. We will specifically test the instrument in chronic care that is of an increasing importance for the health system. Methods Phase one: We will conduct a systematic review of the theories and instruments assessing ORC in healthcare. The retained theoretical information will be synthesized in a conceptual map. A bibliography and database of ORC instruments will be prepared after appraisal of their psychometric properties according to the standards for educational and psychological testing. An online Delphi study will be carried out among decision makers and knowledge users across Canada to assess the importance of these concepts and measures at different steps in the KTA process in chronic care. Phase two: A final OR for KT instrument will be developed and validated both in French and in English and tested in chronic disease management to measure OR for KT regarding the adoption of comprehensive, patient-centered, and system-based CCMs. Discussion This study provides a comprehensive synthesis of current knowledge on explanatory models and instruments assessing OR for KT. Moreover, this project aims to create more

  11. Can NATO's new Very High Readiness Joint Task Force deter?

    DEFF Research Database (Denmark)

    Rynning, Sten; Ringsmose, Jens

    2017-01-01

    ” a distinct strategic rival – Russia. Chief among the Welsh summit initiatives was the decision to set up a new multinational spearhead force – the Very High Readiness Joint Task Force (VJTF) – as part of an enhanced NATO Response Force (NRF) and within the framework of a so-called Readiness Action Plan (RAP...

  12. Readiness for Solving Story Problems.

    Science.gov (United States)

    Dunlap, William F.

    1982-01-01

    Readiness activities are described which are designed to help learning disabled (LD) students learn to perform computations in story problems. Activities proceed from concrete objects to numbers and involve the students in devising story problems. The language experience approach is incorporated with the enactive, iconic, and symbolic levels of…

  13. READINESS OF MILITARY HIGH SCHOOL STUDENTS FOR TACTICAL TASKS

    Directory of Open Access Journals (Sweden)

    Nikolai Alekseevich Seredkin

    2017-06-01

    Full Text Available Background. The purpose of this article is to reveal the features and analyze the studies of the interpretation of the concept of “readiness”, to formulate the definition of the concept of “the future officer’s willingness to solve tactical problems,” to describe the components and its main components. Methods. The methodological basis for researching the problem of the future officers’ readiness for solving tactical tasks is the personal and activity approach. Relying on them, the author reveals the essence of the definition of readiness and a description of its components. Results. The results of the article are the readiness of the cadet for professional work and we consider it as an integrated education formed in the process of professional training, ensuring the performance of their service and job functions, the successful solution of the service-combat tasks of professional activity. It includes a system of personality qualities of the future officer, characterized by a positive attitude towards professional activity, the presence of an adequate holistic view of it, the possession of ways to solve professional problems, the perception of oneself as a subject of one’s own activity. Reflexive attitude to one’s own activity is one of the most important conditions for its deep comprehension, critical analysis and constructive improvement. Conclusion. The definition of the concept of the cadet’s readiness for the solution of tactical tasks and its components is the theoretical basis for improving the process of professional training in a military high school. The components of readiness and its indicators set the teacher of the military higher educational institution a vector of practical activities for its formation.

  14. Operational Art and the Sustainment Warfighting Function

    Science.gov (United States)

    2011-12-01

    Infantry Division (ID) a continuous sustainment line of operation. The leap- frogging of Forward Logisitics Bases provided 3rd Infantry Division (ID...victims. A C-17 Globemaster III departed North Carolina and delivered 14,000 Meals Ready-to- Eat , or MREs, and 14,000 quarts of water in a 7-hour round

  15. Review of operational aids for nuclear plant operators

    International Nuclear Information System (INIS)

    Kisner, R.A.

    1983-01-01

    Many approaches are being explored to improve the safety of nuclear plant operations. One approach is to supply high-quality, relevant information by means of computer-based diagnostic systems to assist plant operators in performing their operational and safety-related roles. The evaluation of operational aids to ensure safe plant operations is a necessary function of NRC. This work has two purposes: to collect limited data on a diversity of operational aids, and to provide a method for evaluating the safety implications of the functions of proposed operational aids. After a discussion of the method evaluation now under study, this paper outlines this data collection to date

  16. Psychometric evaluation of the Work Readiness Questionnaire in schizophrenia.

    Science.gov (United States)

    Potkin, Steven G; Bugarski-Kirola, Dragana; Edgar, Chris J; Soliman, Sherif; Le Scouiller, Stephanie; Kunovac, Jelena; Miguel Velasco, Eugenio; Garibaldi, George M

    2016-04-01

    Unemployment can negatively impact quality of life among patients with schizophrenia. Employment status depends on ability, opportunity, education, and cultural influences. A clinician-rated scale of work readiness, independent of current work status, can be a valuable assessment tool. A series of studies were conducted to create and validate a Work Readiness Questionnaire (WoRQ) for clinicians to assess patient ability to engage in socially useful activity, independent of work availability. Content validity, test-retest and inter-rater reliability, and construct validity were evaluated in three separate studies. Content validity was supported. Cronbach's α was 0.91, in the excellent range. Clinicians endorsed WoRQ concepts, including treatment adherence, physical appearance, social competence, and symptom control. The final readiness decision showed good test-retest reliability and moderate inter-rater reliability. Work readiness was associated with higher function and lower levels of negative symptoms. Low positive and high negative predictive values confirmed the concept validity. The WoRQ has suitable psychometric properties for use in a clinical trial for patients with a broad range of symptom severity. The scale may be applicable to assess therapeutic interventions. It is not intended to assess eligibility for supported work interventions. The WoRQ is suitable for use in schizophrenia clinical trials to assess patient work functional potential.

  17. The Effects of Ready to Use Bibliometric Indicators

    DEFF Research Database (Denmark)

    Wildgaard, Lorna Elizabeth

    2014-01-01

    Ready to use’ bibliometric indicators are being used by end users as never before. Administrators and evaluators for assessment purposes, whereas researchers add indicators to their CV in a competitive move to show visibility in the academic community. ‘Ready to use’ indicators are important...... as they provide researchers with the opportunity to evaluate the effect of their own published works before being evaluated by others. The numerical values of these indicators have personal significance to the individual as they can be interpreted as criteria of success or failure, therefore the bibliometric...

  18. Neighbourhood ethnic diversity buffers school readiness impact in ESL children.

    Science.gov (United States)

    Puchala, Chassidy; Vu, Lan T H; Muhajarine, Nazeem

    2010-01-01

    Contextual factors, as measured by neighbourhood characteristics, shape the experiences children have and affect their "school readiness", i.e., whether they are well or poorly prepared for the transition from home to kindergarten. This study assessed the independent effects of individual and neighbourhood factors on school readiness; specifically, it examined whether and to what degree neighbourhood factors modified children's language ability and thus their school readiness in a population of children in Saskatoon, Saskatchewan. The study included all children attending kindergarten in 2001, 2003 and 2005 in Saskatoon. School readiness and child characteristics were measured by the Early Development Instrument (EDI). The EDI measures child development at school commencement in five domains: physical health and well-being, social competence, emotional maturity, cognitive and language development, and communication skills and general knowledge. Data from the 2001 Census were used to characterize Saskatoon's neighbourhoods. Multilevel modeling examined the independent and buffering or exacerbating effects of individual and neighbourhood factors on the relation between English as a Second Language (ESL) status in children and EDI domain scores. ESL children had significantly lower scores on all EDI domains compared with non-ESL children. Certain factors (e.g., younger age, male, Aboriginal status, having special needs) were significantly related to lower readiness in terms of the emotional maturity, and communication skills and general knowledge domains. Importantly, children who lived in neighbourhoods that were highly transient (with a higher proportion of residents who had moved in the previous year) had lower EDI scores on both domains, and those in neighbourhoods with lower rates of employment had lower EDI scores on communication skills and general knowledge. Neighbourhood ethnic diversity mitigated the negative impact of ESL status on school readiness for both

  19. Columbia River System Operation Review final environmental impact statement. Appendix L: Soils, geology and groundwater

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. This appendix addresses the study of geology, soils, and groundwater concerns relative to the System Operation Review (SOR). Chapter 1 provides an overview of the study, scope, and process for this resource area. In order, the respective sections of this chapter discuss the relevant issues for the study, and the means by which the SOR team carried out the study

  20. Personal and professional readiness university students as the goal and the result training

    Directory of Open Access Journals (Sweden)

    Petro Koval

    2017-02-01

    Full Text Available The article is theoretically grounded personal and professional readiness of students of higher educational institutions for professional work. Identifies the components of personal and professional readiness and the characteristics of the component availability. Defined quality ensuring the success of professional activity of future professionals.Key words: Personality-professional readiness, professional orientation, personal potential, spirituality means of art.

  1. Factors preceding CRM readiness in small- and medium-sized tourism enterprises

    Directory of Open Access Journals (Sweden)

    Dinesh Vallabh

    2015-07-01

    Full Text Available Orientation: Customer relationship management (CRM is important to organisations striving for competitive advantage through building relationships with their customers. Research purpose: This study identified the factors preceding CRM and assessed selected South African small- and medium-sized tourism enterprises’ (SMTEs readiness for CRM. Motivation: CRM is likely to enhance SMTEs’ competitiveness. However, successful adoption and implementation of CRM is unlikely unless the organisation is ready for it. Research design, approach and method: A quantitative research approach and survey questionnaire yielded primary data from 332 respondent organisations selected by systematic sampling. Exploratory factor analysis was used to identify the latent factors preceding CRM readiness. Organisational CRM readiness was assessed based on CRM maturity in terms of data collection, use and sharing throughout the organisation. Main findings: Respondent-organisations performed well on the four factors preceding CRM readiness − business strategy, customer strategy, touch points and competencies, skills and technology and also on data collections and use, but not on data sharing. Practical/Managerial implications: CRM practice is believed to assist organisations in tailoring products and services to customers’ needs, providing customer satisfaction, enhancing customer retention and ultimately improving the organisation’s competitiveness and profitability. CRM might fail if SMTEs do not have CRM-enabling conditions in place and a CRM readiness audit should therefore be performed. Contribution: The study contributes to a largely under-researched area concerning CRM in SMTEs by providing an improved understanding of the factors that will enable SMTEs to engage in CRM activities.

  2. Democracy in schools: are educators ready for teacher leadership?

    OpenAIRE

    Elsabé de Villiers; SG (Fanie) Pretorius

    2011-01-01

    The aim of this research was to determine educators' perceptions of and readiness for teacher leadership. A total of 283 educators in the Eden and Central Karoo Education District in the Western Cape participated in the study. The participants included district officials, principals, and members of school management teams, as well as veteran, middle, and novice educators. A series of instruments was used to determine educators' perspectives, perceptions and readiness for teacher leadership, i...

  3. Critical Readiness Review EHS Water Quality and Microbiology

    Science.gov (United States)

    Woo, Cindy

    2010-01-01

    Presentation reviews the status in reference to the Environmental, Health and Safety (EHS) of the water quality and microbiology for the International Space Station. It includes information about crew training, hardware delivery, and those items that will be returned for study.

  4. Copernicus POD Service: Ready for Sentinel-3

    Science.gov (United States)

    Peter, H.; Fernández, J.; Escobar, D.; Féménias, P.; Flohrer, C.; Otten, M.

    2015-12-01

    The Copernicus POD Service is part of the Copernicus PDGS Ground Segment of the Sentinel missions. A GMV-led consortium is operating the Copernicus POD Service being in charge of generating precise orbital products and auxiliary data files for their use as part of the processing chains of the respective Sentinel PDGS. The Sentinel-1, -2 & -3 missions have different but very demanding requirements in terms of orbital accuracy and timeliness. Orbital products in Near Real Time (latency: 30 min), Short Time Critical (1.5 days) and Non-time Critical (20-30 days) are required. The accuracy requirements are very challenging, targeting 5 cm in 3D for Sentinel-1 and 2-3 cm in radial direction for Sentinel-3. Sentinel-3A carries, in addition to a GPS receiver a laser retro reflector and a DORIS receiver. On the one hand, the three different techniques GPS, SLR and DORIS make POD more complex but, on the other hand, it is very helpful to have independent techniques available for validation of the orbit results. The successful POD processing for Sentinel-1A is a good preparation for Sentinel-3A due to the similar demanding orbit accuracy requirements. The Copernicus POD Service is ready for Sentinel-3A and the service will process GPS and SLR data routinely and has the capacity to process DORIS in NTC and reprocessing campaigns. The three independent orbit determination techniques on Sentinel-3 offer big potential for scientific exploitation. Carrying all three techniques together makes the satellite, e.g., very useful for combining all the techniques on observation level as it could only be done for Jason-2 until now. The Sentinel POD Quality Working Group strongly supporting the CPOD Service delivers additional orbit solutions to validate the CPOD results independently. The recommendations from this body guarantee that the CPOD Service is updated following state-of-the-art algorithms, models and conventions. The QWG also focuses on the scientific exploitation of the

  5. Development of an instrument to assess readiness to recover in anorexia nervosa.

    Science.gov (United States)

    Rieger, E; Touyz, S; Schotte, D; Beumont, P; Russell, J; Clarke, S; Kohn, M; Griffiths, R

    2000-12-01

    The degree to which patients with anorexia nervosa demonstrate readiness to recover from their illness has received scant theoretical or empirical attention. Investigating the prevalence and degree of amotivation for recovery in anorexia nervosa, its role in outcome, and the effectiveness of interventions designed to enhance readiness to recover necessitates the existence of a reliable and valid measure of motivational issues relevant to the disorder. The present study aimed to develop and evaluate an instrument for assessing readiness to recover in anorexia nervosa, namely, the Anorexia Nervosa Stages of Change Questionnaire (ANSOCQ), a 23-item self-report questionnaire based on Prochaska and DiClemente's stages of change model. Seventy-one inpatients with anorexia nervosa participated in the study. On several occasions during their admission, participants completed the ANSOCQ as well as questionnaires assessing readiness to recover, anorexic symptomatology, general distress, and social desirability. The ANSOCQ demonstrated good internal consistency (.90) and 1-week test-retest reliability (.89). Various aspects of validity were also supported, such as significant relationships with other instruments assessing readiness to recover and the prediction of weight gain during different periods of treatment. The results suggest that the ANSOCQ is a psychometrically sound instrument that may prove useful in investigating the role of readiness to recover in anorexia nervosa. Copyright 2000 John Wiley & Sons, Inc.

  6. The Readiness of Sorsogon State College Faculty for Teaching with ICT: Basis for a Faculty Training Program

    Directory of Open Access Journals (Sweden)

    Catherine A. De Castro

    2016-02-01

    Full Text Available Information and communication technologies (ICT such as computers, multimedia systems, productivity software, and the Internet have greatly improved the performance of different organizations and influenced higher learning institutions like Sorsogon State College (SSC to develop and implement innovative teaching and learning methods. However, despite the many benefits of ICT when used in education, there are still faculty members who do not use these technologies for teaching. Hence, this research was conducted to assess their readiness for teaching with ICT. Findings revealed that most of the surveyed respondents were above forty-five years old, have 1-10 years of government service, and have specialization in the field of education. In terms of readiness to teach with ICT, the results disclosed that they were fairly ready along human-resource readiness, ready along technological skill readiness, and much ready along equipment readiness. Their age was not significantly related to their human resource readiness but significantly related to their technological skill and equipment readiness. The respondents’ number of years in the government was significantly related to their readiness to teach with ICT in terms of human resource, technological skill, and equipment readiness. Their field of specialization was not significantly related to their readiness to teach with ICT. Among the most identified factors why some of them do not use ICT resources were unavailability of ICT resources, lack of knowledge and lack of familiarity to ICT. The output of this research is a faculty training program to enhance their know

  7. The Pediatrician's Role in Optimizing School Readiness.

    Science.gov (United States)

    2016-09-01

    School readiness includes not only the early academic skills of children but also their physical health, language skills, social and emotional development, motivation to learn, creativity, and general knowledge. Families and communities play a critical role in ensuring children's growth in all of these areas and thus their readiness for school. Schools must be prepared to teach all children when they reach the age of school entry, regardless of their degree of readiness. Research on early brain development emphasizes the effects of early experiences, relationships, and emotions on creating and reinforcing the neural connections that are the basis for learning. Pediatricians, by the nature of their relationships with families and children, may significantly influence school readiness. Pediatricians have a primary role in ensuring children's physical health through the provision of preventive care, treatment of illness, screening for sensory deficits, and monitoring nutrition and growth. They can promote and monitor the social-emotional development of children by providing anticipatory guidance on development and behavior, by encouraging positive parenting practices, by modeling reciprocal and respectful communication with adults and children, by identifying and addressing psychosocial risk factors, and by providing community-based resources and referrals when warranted. Cognitive and language skills are fostered through timely identification of developmental problems and appropriate referrals for services, including early intervention and special education services; guidance regarding safe and stimulating early education and child care programs; and promotion of early literacy by encouraging language-rich activities such as reading together, telling stories, and playing games. Pediatricians are also well positioned to advocate not only for children's access to health care but also for high-quality early childhood education and evidence-based family supports such as

  8. AECB staff review of Bruce NGS 'B' operation for the year 1989

    International Nuclear Information System (INIS)

    1990-06-01

    The operation of the Bruce Nuclear Generating Station 'B' is monitored and licensing requirements are enforced by the Atomic Energy Control Board (AECB), which observes operation of the reactors, conducts audits, witnesses important activities, reviews station documentation and reports, and issue approvals, where appropriate, in accordance with licence conditions. This report records the conclusions of the AECB staff assessment of Bruce NGS 'B' during 1989. In general, the station operated within acceptable safety standards. Quality improvement initiatives started in 1989 should lead to improved station maintenance and operation in coming years. Ontario Hydro still needs to improve the administration of operating memos, deficiency reports and call-ups. Station management must ensure that shift supervisors and reactor first operators operate the station in a conservative manner at all times and put safety interests first when responding to a unit upset. (2 tabs.)

  9. 75 FR 2490 - Taking and Importing Marine Mammals; Naval Explosive Ordnance Disposal School Training Operations...

    Science.gov (United States)

    2010-01-15

    ... Importing Marine Mammals; Naval Explosive Ordnance Disposal School Training Operations Activities at Eglin...) for authorization to take marine mammals, by harassment, incidental to Naval Explosive Ordnance Disposal School (NEODS) training operations, military readiness activities, at Eglin AFB, FL from...

  10. Immigrants and the US Army: A Study in Readiness and the American Dream

    Science.gov (United States)

    2016-05-26

    Immigrants and the US Army: A Study in Readiness and the American Dream A Monograph by LTC Che T. Arosemena...Approval Page Name of Candidate: LTC Che T. Arosemena Monograph Title: Immigrants and the US Army: A Study in Readiness and the American Dream Approved by...Abstract Immigrants and the US Army: A Study in Readiness and the American Dream , by LTC Che T. Arosemena, USA, 71

  11. Mission operations concepts for Earth Observing System (EOS)

    Science.gov (United States)

    Kelly, Angelita C.; Taylor, Thomas D.; Hawkins, Frederick J.

    1991-01-01

    Mission operation concepts are described which are being used to evaluate and influence space and ground system designs and architectures with the goal of achieving successful, efficient, and cost-effective Earth Observing System (EOS) operations. Emphasis is given to the general characteristics and concepts developed for the EOS Space Measurement System, which uses a new series of polar-orbiting observatories. Data rates are given for various instruments. Some of the operations concepts which require a total system view are also examined, including command operations, data processing, data accountability, data archival, prelaunch testing and readiness, launch, performance monitoring and assessment, contingency operations, flight software maintenance, and security.

  12. The training of the operation personnel

    International Nuclear Information System (INIS)

    Martin, H.D.

    1975-01-01

    A survey about training places and the volume of the training program for reactor personnel in the Federal Republic of Germany is given. Paragraph 7 of the atomic energy act, which imposes on the operators of nuclear energy plants the qualifired training of the personnel, is refered to. Positive experiences with the use of simulation equipment for training have led to the planning of a simulator-centre which is expected to be ready for operation in 1977. The versatile program of this centre is briefly reported. (ORU) [de

  13. OSART guidelines - 2005 edition. Reference report for IAEA Operational Safety Review Teams (OSARTs)

    International Nuclear Information System (INIS)

    2005-01-01

    The International Atomic Energy Agency (IAEA) has put forward the vision of a global nuclear safety regime that provides for the protection of people and the environment from the effects of ionizing radiation from nuclear facilities, the minimization of the likelihood of accidents that could endanger life and property and effective mitigation of the effects of any such events should they occur. The strategic approach for achieving the vision of enhancing this regime involves four elements and aims at ensuring that the overall nuclear safety level in Member States continues to improve: - Improvement of national and international safety infrastructures: - Establishment and global acceptance of IAEA safety standards; - Integrated approach to the provision for the application of safety standards; and - Global network of knowledge and experience. The IAEA Operational Safety Review Team (OSART) programme provides advice and assistance to Member States to enhance the safety of nuclear power plants during commissioning and operation. The OSART programme, initiated in 1982, is available to all Member States with nuclear power plants under commissioning or in operation. The OSART methodology and its safety services may also be applied to other nuclear installations (e.g. fuel cycle facilities, research reactors). Conservative design, careful manufacture and sound construction are all prerequisites for safe operation of nuclear power plants. However, the safety of the plant depends ultimately on sound policies, procedures, processes and practices; on the capability and reliability of the commissioning and operating personnel; on comprehensive instructions; and on adequate resources. A positive attitude and conscientiousness on the part of the management and staff in discharging their responsibilities is important to safety. OSART missions consider these aspects in assessing a facility's operational practices in comparison with those used successfully in other countries and

  14. OSART guidelines - 2005 edition. Reference report for IAEA Operational Safety Review Teams (OSARTs)

    International Nuclear Information System (INIS)

    2007-01-01

    The International Atomic Energy Agency (IAEA) has put forward the vision of a global nuclear safety regime that provides for the protection of people and the environment from the effects of ionizing radiation from nuclear facilities, the minimization of the likelihood of accidents that could endanger life and property and effective mitigation of the effects of any such events should they occur. The strategic approach for achieving the vision of enhancing this regime involves four elements and aims at ensuring that the overall nuclear safety level in Member States continues to improve: - Improvement of national and international safety infrastructures: - Establishment and global acceptance of IAEA safety standards. - Integrated approach to the provision for the application of safety standards. And - Global network of knowledge and experience. The IAEA Operational Safety Review Team (OSART) programme provides advice and assistance to Member States to enhance the safety of nuclear power plants during commissioning and operation. The OSART programme, initiated in 1982, is available to all Member States with nuclear power plants under commissioning or in operation. The OSART methodology and its safety services may also be applied to other nuclear installations (e.g. fuel cycle facilities, research reactors). Conservative design, careful manufacture and sound construction are all prerequisites for safe operation of nuclear power plants. However, the safety of the plant depends ultimately on sound policies, procedures, processes and practices. On the capability and reliability of the commissioning and operating personnel. On comprehensive instructions. And on adequate resources. A positive attitude and conscientiousness on the part of the management and staff in discharging their responsibilities is important to safety. OSART missions consider these aspects in assessing a facility's operational practices in comparison with those used successfully in other countries and

  15. OSART guidelines - 2005 edition. Reference report for IAEA Operational Safety Review Teams (OSARTs)

    International Nuclear Information System (INIS)

    2008-01-01

    The International Atomic Energy Agency (IAEA) has put forward the vision of a global nuclear safety regime that provides for the protection of people and the environment from the effects of ionizing radiation from nuclear facilities, the minimization of the likelihood of accidents that could endanger life and property and effective mitigation of the effects of any such events should they occur. The strategic approach for achieving the vision of enhancing this regime involves four elements and aims at ensuring that the overall nuclear safety level in Member States continues to improve: - Improvement of national and international safety infrastructures: - Establishment and global acceptance of IAEA safety standards. - Integrated approach to the provision for the application of safety standards. And - Global network of knowledge and experience. The IAEA Operational Safety Review Team (OSART) programme provides advice and assistance to Member States to enhance the safety of nuclear power plants during commissioning and operation. The OSART programme, initiated in 1982, is available to all Member States with nuclear power plants under commissioning or in operation. The OSART methodology and its safety services may also be applied to other nuclear installations (e.g. fuel cycle facilities, research reactors). Conservative design, careful manufacture and sound construction are all prerequisites for safe operation of nuclear power plants. However, the safety of the plant depends ultimately on sound policies, procedures, processes and practices. On the capability and reliability of the commissioning and operating personnel. On comprehensive instructions. And on adequate resources. A positive attitude and conscientiousness on the part of the management and staff in discharging their responsibilities is important to safety. OSART missions consider these aspects in assessing a facility's operational practices in comparison with those used successfully in other countries and

  16. Quality and sensory acceptability of a chilled functional apple ready-dessert.

    Science.gov (United States)

    Keenan, D F; Brunton, N P; Gormley, T R; Butler, F

    2012-04-01

    An apple and dairy based ready-dessert with an added prebiotic was stored and chill temperatures and number of quality attributes were monitored during chill (4 °C) storage for 30 days. All ready-desserts were thermally processed by sous vide (P (90) > 10 min). The stability of the dairy component in ready-desserts was monitored by measuring volatile free fatty acids. Changes in these components were more evident in prebiotic-enriched samples compared to controls. However, no significant differences were observed over storage in control and prebiotic-enriched ready-desserts. This was supported by sensory analysis that showed no significant changes over storage in control or prebiotic-enriched samples. Of the other quality parameters, the addition of prebiotic inclusions resulted in lower L and b values and dry matter (p desserts. A decrease (p < 0.05) in flow behaviour (n) led to concomitant increases in consistency index (K) and complex modulus (G*) values in control samples.

  17. The Social Context of Readiness.

    Science.gov (United States)

    Nelson, Regena Fails

    This study examined how kindergarten teachers' views of readiness (maturational, learning, or school) are influenced by students from urban, suburban, and rural areas; by minority and non-minority students; and by students from lower and middle class backgrounds. The framework for the study was the social constructivist theory, the theory that all…

  18. ESTIMATION OF SPORTS-TECHNICAL READINESS OF STUDENTS OF METHODICAL BRANCH «FOOTBALL» MSUCE

    Directory of Open Access Journals (Sweden)

    Shamonin Andrey Valentinovich

    2012-07-01

    Full Text Available Increase of sports-technical skill in sports occurs on the basis of last achievements of the theory and physical training and sports practice. Development of football isn't possible without search and introduction in training process of optimum pedagogical models of perfection of physical and technical readiness of football players. Such pedagogical models should be applied, as in groups of initial preparation, so at the subsequent grade levels, including in student's football. Modern training process (pedagogical model, should be under construction on objective indicators of physical, technical and special readiness (so-called feedback. However, the estimation of sports-technical readiness at sports schools on football is reduced only to testing of speed, jumps, juggling, dribbling and a shoot for goal. The same criteria are applied and in student's football. Unfortunately, the given control exercises not in a condition to the full to reflect level of physical and technical readiness of the football player. For more objective estimation of special readiness it is necessary to use the test tasks revealing a level of development of coordination abilities of game structure game and competitive activity (game in football. It will allow trainers to have fuller picture of readiness of the football player, in respect of its professional (football skills. As a result coach have possibility to trace level of a condition of the various parties of sports readiness (physical, technical and coordination student's youth engaged in football at each stage of long-term preparation.

  19. Determinants of readiness to adopt mHealth in a rural community of Bangladesh.

    Science.gov (United States)

    Khatun, Fatema; Heywood, Anita E; Ray, Pradeep K; Hanifi, S M A; Bhuiya, Abbas; Liaw, Siaw-Teng

    2015-10-01

    Evidence in favor of mHealth for healthcare delivery in settings where trained health workforce is limited or unavailable is accumulating. With rapid growth in access to mobile phones and an acute shortage of health workforce in Bangladesh, mHealth initiatives are increasing with more than 20 current initiatives in place. "Readiness" is a crucial prerequisite to the successful implementation of telehealth programs. However, systematic assessment of the community readiness for mHealth-based services in the country is lacking. We report on a recent study describing the influence of community readiness for mHealth of a rural Bangladesh community. A conceptual framework for mHealth readiness was developed, which included three categories: technological, motivational and resource readiness. This guided the questionnaire development for the survey conducted in the Chakaria sub-district of Bangladesh from November 2012 to April 2013. Multivariate logistic regression was used to examine ownership of mobile phones, use of the technology, and knowledge regarding awareness of mHealth services as predictors of the community readiness to adopt mHealth. A total of 4915 randomly selected household members aged 18 years and over completed the survey. The data explained the sub-categories of the readiness dimensions. In terms of access, 45% of respondents owned a mobile phone with ownership higher among males, younger participants and those in the highest socioeconomic quintiles. Results related to technological readiness showed that among mobile phone owners, 50% were aware of SMS but only sending and receiving SMS. Only 37% generally read the received SMS. Only 5% of respondents used the internet capabilities on their phone and 25% used voice messages. The majority (73%) of the participants were interested in joining mHealth programs in the future. Multivariate analysis showed that ownership of a mobile phone (aOR 1.3, 95% CI 1.1-1.5), younger age (aOR 2.6, 95% CI 2.1-3.3), males

  20. The moral economy of ready-made food.

    Science.gov (United States)

    Wheeler, Kathryn

    2017-11-22

    The aim of this paper is to develop and apply a framework to explore how moralities of consumption are constituted in and through markets. Using the case of ready-made foods, this paper argues moral economies are comprised through interactions between micro-, meso- and macro-level processes in the form of instituted systems of provision, state regulation, collective food customs promoted though media, NGOs and lifestyle practitioners, and the everyday reflections of consumers. Building on a theoretical framework developed to understand the moral economy of work and employment (Bolton and Laaser 2013), this paper explores how markets for ready-made food are incessantly negotiated in the context of moral ideas about cooking, femininity and individual responsibility. It focuses on 'new' market innovations of fresh ready-to-cook meal solutions and explores how these products are both a response to moralizing discourses about cooking 'properly', as well as an intervention into the market that offers opportunities for new moral identities to be performed. Using data gathered from interviews with food manufacturers and consumers, I advocate for a multi-layered perspective that captures the dynamic interplay between consumers, markets and moralities of consumption. © London School of Economics and Political Science 2017.