WorldWideScience

Sample records for operating procedures volume

  1. User's operating procedures. Volume 3: Projects directorate information programs

    Science.gov (United States)

    Haris, C. G.; Harris, D. K.

    1985-01-01

    A review of the user's operating procedures for the scout project automatic data system, called SPADS is presented. SPADS is the results of the past seven years of software development on a prime mini-computer. SPADS was developed as a single entry, multiple cross-reference data management and information retrieval system for the automation of Project office tasks, including engineering, financial, managerial, and clerical support. This volume, three of three, provides the instructions to operate the projects directorate information programs in data retrieval and file maintenance via the user friendly menu drivers.

  2. User's operating procedures. Volume 2: Scout project financial analysis program

    Science.gov (United States)

    Harris, C. G.; Haris, D. K.

    1985-01-01

    A review is presented of the user's operating procedures for the Scout Project Automatic Data system, called SPADS. SPADS is the result of the past seven years of software development on a Prime mini-computer located at the Scout Project Office, NASA Langley Research Center, Hampton, Virginia. SPADS was developed as a single entry, multiple cross-reference data management and information retrieval system for the automation of Project office tasks, including engineering, financial, managerial, and clerical support. This volume, two (2) of three (3), provides the instructions to operate the Scout Project Financial Analysis program in data retrieval and file maintenance via the user friendly menu drivers.

  3. User's operating procedures. Volume 1: Scout project information programs

    Science.gov (United States)

    Harris, C. G.; Harris, D. K.

    1985-01-01

    A review of the user's operating procedures for the Scout Project Automatic Data System, called SPADS is given. SPADS is the result of the past seven years of software development on a Prime minicomputer located at the Scout Project Office. SPADS was developed as a single entry, multiple cross reference data management and information retrieval system for the automation of Project office tasks, including engineering, financial, managerial, and clerical support. The instructions to operate the Scout Project Information programs in data retrieval and file maintenance via the user friendly menu drivers is presented.

  4. Field Operations and Enforcement Manual for Air Pollution Control. Volume III: Inspection Procedures for Specific Industries.

    Science.gov (United States)

    Weisburd, Melvin I.

    The Field Operations and Enforcement Manual for Air Pollution Control, Volume III, explains in detail the following: inspection procedures for specific sources, kraft pulp mills, animal rendering, steel mill furnaces, coking operations, petroleum refineries, chemical plants, non-ferrous smelting and refining, foundries, cement plants, aluminum…

  5. Hanford tank waste operation simulator operational waste volume projection verification and validation procedure

    International Nuclear Information System (INIS)

    HARMSEN, R.W.

    1999-01-01

    The Hanford Tank Waste Operation Simulator is tested to determine if it can replace the FORTRAN-based Operational Waste Volume Projection computer simulation that has traditionally served to project double-shell tank utilization. Three Test Cases are used to compare the results of the two simulators; one incorporates the cleanup schedule of the Tri Party Agreement

  6. Outcomes of PCI in Relation to Procedural Characteristics and Operator Volumes in the United States.

    Science.gov (United States)

    Fanaroff, Alexander C; Zakroysky, Pearl; Dai, David; Wojdyla, Daniel; Sherwood, Matthew W; Roe, Matthew T; Wang, Tracy Y; Peterson, Eric D; Gurm, Hitinder S; Cohen, Mauricio G; Messenger, John C; Rao, Sunil V

    2017-06-20

    Professional guidelines have reduced the recommended minimum number to an average of 50 percutaneous coronary intervention (PCI) procedures performed annually by each operator. Operator volume patterns and associated outcomes since this change are unknown. The authors describe herein PCI operator procedure volumes; characteristics of low-, intermediate-, and high-volume operators; and the relationship between operator volume and clinical outcomes in a large, contemporary, nationwide sample. Using data from the National Cardiovascular Data Registry collected between July 1, 2009, and March 31, 2015, we examined operator annual PCI volume. We divided operators into low- (100 PCIs per year) volume groups, and determined the adjusted association between annual PCI volume and in-hospital outcomes, including mortality. The median annual number of procedures performed per operator was 59; 44% of operators performed PCI procedures per year. Low-volume operators more frequently performed emergency and primary PCI procedures and practiced at hospitals with lower annual PCI volumes. Unadjusted in-hospital mortality was 1.86% for low-volume operators, 1.73% for intermediate-volume operators, and 1.48% for high-volume operators. The adjusted risk of in-hospital mortality was higher for PCI procedures performed by low- and intermediate-volume operators compared with those performed by high-volume operators (adjusted odds ratio: 1.16 for low versus high; adjusted odds ratio: 1.05 for intermediate vs. high volume) as was the risk for new dialysis post PCI. No volume relationship was observed for post-PCI bleeding. Many PCI operators in the United States are performing fewer than the recommended number of PCI procedures annually. Although absolute risk differences are small and may be partially explained by unmeasured differences in case mix between operators, there remains an inverse relationship between PCI operator volume and in-hospital mortality that persisted in risk

  7. Library Operations Policies and Procedures, Volume 2. Central Archive for Reusable Defense Software (CARDS)

    Science.gov (United States)

    1994-02-28

    use and customize those policies and procedures applicable to the implementor’s situation. It is not the intent of this manual to restrict the library...improvements. Pare 10 ka•- V •DkI U Release Manager The Release Manager provides franchisees with media copies of existing libraries, as needed. Security...implementors, and potential library franchisees . Security Team The Security Team assists the Security Officer with security analysis. Team members are

  8. Natural Resource Information System. Volume 2: System operating procedures and instructions

    Science.gov (United States)

    1972-01-01

    A total computer software system description is provided for the prototype Natural Resource Information System designed to store, process, and display data of maximum usefulness to land management decision making. Program modules are described, as are the computer file design, file updating methods, digitizing process, and paper tape conversion to magnetic tape. Operating instructions for the system, data output, printed output, and graphic output are also discussed.

  9. Pollutant Assessments Group procedures manual: Volume 2, Technical procedures

    Energy Technology Data Exchange (ETDEWEB)

    1992-03-01

    This is volume 2 of the manuals that describes the technical procedures currently in use by the Pollution Assessments Group. This manual incorporates new developments in hazardous waste assessment technology and administrative policy. Descriptions of the equipment, procedures and operations of such things as radiation detection, soil sampling, radionuclide monitoring, and equipment decontamination are included in this manual. (MB)

  10. Design of Training Systems, Phase II Report, Volume III; Model Program Descriptions and Operating Procedures. TAEG Report No. 12-2.

    Science.gov (United States)

    Naval Training Equipment Center, Orlando, FL. Training Analysis and Evaluation Group.

    The Design of Training Systems (DOTS) project was initiated by the Department of Defense (DOD) to develop tools for the effective management of military training organizations. Volume 3 contains the model and data base program descriptions and operating procedures designed for phase 2 of the project. Flow charts and program listings for the…

  11. Automated emergency operating procedures

    International Nuclear Information System (INIS)

    Perez-Ramirez, G.; Nelson, P.F.

    1990-01-01

    This paper describes the development of a training tool for the symptom oriented emergency operating procedures used at the Laguna Verde Nuclear Power Plant. EOPs and operator training are intended to assist the operator for managing accident situations. A prototype expert system based on the EOPs has been developed for operator training. The demonstration expert system was developed using a commercial shell. The knowledge base consists of two parts. The specific operator actions to be executed for 5 selected accident sequences and the EOPs steps for the reactor pressure vessel control of the water level, pressure, and power. The knowledge is expressed in the form of IF-THEN production rules. A typical training session will display a set of conditions and will prompt the trainee to indicate the appropriate step to perform. This mode will guide the trainee through selected accident sequences. A second mode of the expert system will prompt the trainee for the current plant conditions and the expert system will respond with the EOPs which are required to be performed under these conditions. This allows the trainee to study What if situations

  12. Soil Sampling Operating Procedure

    Science.gov (United States)

    EPA Region 4 Science and Ecosystem Support Division (SESD) document that describes general and specific procedures, methods, and considerations when collecting soil samples for field screening or laboratory analysis.

  13. Electronic Procedures for Medical Operations

    Science.gov (United States)

    2015-01-01

    Electronic procedures are replacing text-based documents for recording the steps in performing medical operations aboard the International Space Station. S&K Aerospace, LLC, has developed a content-based electronic system-based on the Extensible Markup Language (XML) standard-that separates text from formatting standards and tags items contained in procedures so they can be recognized by other electronic systems. For example, to change a standard format, electronic procedures are changed in a single batch process, and the entire body of procedures will have the new format. Procedures can be quickly searched to determine which are affected by software and hardware changes. Similarly, procedures are easily shared with other electronic systems. The system also enables real-time data capture and automatic bookmarking of current procedure steps. In Phase II of the project, S&K Aerospace developed a Procedure Representation Language (PRL) and tools to support the creation and maintenance of electronic procedures for medical operations. The goal is to develop these tools in such a way that new advances can be inserted easily, leading to an eventual medical decision support system.

  14. Operating procedures and safety culture

    International Nuclear Information System (INIS)

    Carnino, A.

    1993-01-01

    The development of new technologies in recent years has led to a tremendous increase in the information to be mastered by operators in industrial processes. The information at operators disposal both in routine situations and accidental ones needs to be well prepared and organized to ensure reliability and safety. The man-machine interface should give operators all the necessary and clear indications on the process status and evolution so that the operators can operate the installation through adequate procedures. Procedures represent the real interface and mode of action of the operators on the machine, and they are of prime importance. Although they are by essence quite different, the routine, accident, and emergency procedures have in common one attribute: They all require a good safety culture both in their development and their implementation. From the definition given by the members of the International Nuclear Safety Advisory Group (INSAG), open-quotes Safety culture is that assembly of characteristics and attitudes in organizations and individuals which establishes that, as an overriding priority, nuclear plant safety issues receive the attention warranted by their significance,close quotes one can see that two aspects are embedded, a collective attitude that in fact is reflected in the managerial framework and an individual one that is linked to personnel behavior and work practices

  15. Operational Waste Volume Projection

    Energy Technology Data Exchange (ETDEWEB)

    STRODE, J.N.

    2000-08-28

    Waste receipts to the double-shell tank system are analyzed and wastes through the year 2015 are projected based on generation trends of the past 12 months. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement. Assumptions were current as of June. 2000.

  16. Operational waste volume projection

    International Nuclear Information System (INIS)

    Koreski, G.M.; Strode, J.N.

    1995-06-01

    Waste receipts to the double-shell tank system are analyzed and wastes through the year 2015 are projected based on generation trends of the past 12 months. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the tri-party agreement. Assumptions are current as of June 1995

  17. Operational Waste Volume Projection

    International Nuclear Information System (INIS)

    STRODE, J.N.

    2000-01-01

    Waste receipts to the double-shell tank system are analyzed and wastes through the year 2015 are projected based on generation trends of the past 12 months. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement. Assumptions were current as of June. 2000

  18. Computer managed emergency operating procedures

    International Nuclear Information System (INIS)

    Salamun, I.; Mavko, B.; Stritar, A.

    1994-01-01

    New computer technology is a very effective tool for developing a new design of nuclear power plant control room. It allows designer possibility to create a tool for managing with large database of power plant parameters and displaying them in different graphic forms and possibility of automated execution of well known task. The structure of Emergency Operating Procedures (EOP) is very suitable for programming and for creating expert system. The Computerized Emergency Operating Procedures (CEOP) described in this paper can be considered as an upgrading of standard EOP approach. EmDiSY (Emergency Display System - computer code name for CEOP) main purpose is to supply the operator with necessary information, to document all operator actions and to execute well known tasks. It is a function oriented CEOP that gives operator guidance on how to verify the critical safety functions and how to restore and maintain these functions where they are degraded. All knowledge is coded and stored in database files. The knowledge base consists from stepping order for verifying plant parameters, desired values of parameters, conditions for comparison and links between procedures and actions. Graphical shell allows users to read database, to follow instruction and to find out correct task. The desired information is concentrated in one screen and allows users to focus on a task. User is supported in two ways: desired parameter values are displayed on the process picture and automated monitoring critical safety function status trees are all time in progress and available to the user. (author). 4 refs, 4 figs

  19. MPCV Exercise Operational Volume Analysis

    Science.gov (United States)

    Godfrey, A.; Humphreys, B.; Funk, J.; Perusek, G.; Lewandowski, B. E.

    2017-01-01

    In order to minimize the loss of bone and muscle mass during spaceflight, the Multi-purpose Crew Vehicle (MPCV) will include an exercise device and enough free space within the cabin for astronauts to use the device effectively. The NASA Digital Astronaut Project (DAP) has been tasked with using computational modeling to aid in determining whether or not the available operational volume is sufficient for in-flight exercise.Motion capture data was acquired using a 12-camera Smart DX system (BTS Bioengineering, Brooklyn, NY), while exercisers performed 9 resistive exercises without volume restrictions in a 1g environment. Data were collected from two male subjects, one being in the 99th percentile of height and the other in the 50th percentile of height, using between 25 and 60 motion capture markers. Motion capture data was also recorded as a third subject, also near the 50th percentile in height, performed aerobic rowing during a parabolic flight. A motion capture system and algorithms developed previously and presented at last years HRP-IWS were utilized to collect and process the data from the parabolic flight [1]. These motions were applied to a scaled version of a biomechanical model within the biomechanical modeling software OpenSim [2], and the volume sweeps of the motions were visually assessed against an imported CAD model of the operational volume. Further numerical analysis was performed using Matlab (Mathworks, Natick, MA) and the OpenSim API. This analysis determined the location of every marker in space over the duration of the exercise motion, and the distance of each marker to the nearest surface of the volume. Containment of the exercise motions within the operational volume was determined on a per-exercise and per-subject basis. The orientation of the exerciser and the angle of the footplate were two important factors upon which containment was dependent. Regions where the exercise motion exceeds the bounds of the operational volume have been

  20. FFTF operations procedures preparation guide. Revision 2

    International Nuclear Information System (INIS)

    1976-12-01

    The Guide is intended to provide guidelines for the initial preparation of FFTF Operating Procedures. The Procedures Preparation Guide was developed from the plan presented and approved in the FFTF Reactor Plant Procedures Plan, PC-1, Revision 3

  1. Provider volume and outcomes for oncological procedures.

    LENUS (Irish Health Repository)

    Killeen, S D

    2012-02-03

    BACKGROUND: Oncological procedures may have better outcomes if performed by high-volume providers. METHODS: A review of the English language literature incorporating searches of the Medline, Embase and Cochrane collaboration databases was performed. Studies were included if they involved a patient cohort from 1984 onwards, were community or population based, and assessed health outcome as a dependent variable and volume as an independent variable. The studies were also scored quantifiably to assess generalizability with respect to any observed volume-outcome relationship and analysed according to organ system; numbers needed to treat were estimated where possible. RESULTS: Sixty-eight relevant studies were identified and a total of 41 were included, of which 13 were based on clinical data. All showed either an inverse relationship, of variable magnitude, between provider volume and mortality, or no volume-outcome effect. All but two clinical reports revealed a statistically significant positive relationship between volume and outcome; none demonstrated the opposite. CONCLUSION: High-volume providers have a significantly better outcome for complex cancer surgery, specifically for pancreatectomy, oesphagectomy, gastrectomy and rectal resection.

  2. Small Aircraft Transportation System, Higher Volume Operations Concept: Normal Operations

    Science.gov (United States)

    Abbott, Terence S.; Jones, Kenneth M.; Consiglio, Maria C.; Williams, Daniel M.; Adams, Catherine A.

    2004-01-01

    This document defines the Small Aircraft Transportation System (SATS), Higher Volume Operations (HVO) concept for normal conditions. In this concept, a block of airspace would be established around designated non-towered, non-radar airports during periods of poor weather. Within this new airspace, pilots would take responsibility for separation assurance between their aircraft and other similarly equipped aircraft. Using onboard equipment and procedures, they would then approach and land at the airport. Departures would be handled in a similar fashion. The details for this operational concept are provided in this document.

  3. Soil Gas Sampling Operating Procedure

    Science.gov (United States)

    EPA Region 4 Science and Ecosystem Support Division (SESD) document that describes general and specific procedures, methods, and considerations when collecting soil gas samples for field screening or laboratory analysis.

  4. Operant Variability: Procedures and Processes

    Science.gov (United States)

    Machado, Armando; Tonneau, Francois

    2012-01-01

    Barba's (2012) article deftly weaves three main themes in one argument about operant variability. From general theoretical considerations on operant behavior (Catania, 1973), Barba derives methodological guidelines about response differentiation and applies them to the study of operant variability. In the process, he uncovers unnoticed features of…

  5. Developing, adopting and adapting operating procedures

    International Nuclear Information System (INIS)

    Rabouhams, J.

    1986-01-01

    This lecture specifies all the dispositions which have been taken by EDF Nuclear and Fossil Generation Department - according to the fact that availability and safety largely depend on the quality of the procedures and their easy handling - in order to develop, adopt and adapt the operating procedures. The following points are treated: General organization of procedures for plant operation during normal and abnormal conditions; Personnel and extend of responsibility involved into the development of procedures (research center, training center, specialized services, nuclear station, etc.); Validation of the procedures by means of full-scope simulators; Modifications of the procedures taking into account operation experience in material and human fields; Development of simulation softs in order to perform the procedures in abnormal situations; Evolution of operating technics and future skills. (orig.)

  6. MITS Feed and Withdrawal Subsystem: operating procedures

    International Nuclear Information System (INIS)

    Brown, W.S.

    1980-01-01

    This procedure details the steps required to provide continuous feed flow and withdrawal of process product and waste flows in support of thruput operation in the cascade or its elements. It particularly requires operator attention to safety considerations

  7. MITS Feed and Withdrawal Subsystem: operating procedures

    International Nuclear Information System (INIS)

    Brown, W.S.

    1980-01-01

    This document details procedures for the operation of the MITS (Machine Interface Test System) Feed and Withdrawal Subsystem (F and W). Included are fill with UF 6 , establishment of recycle and thruput flows, shutdown, UF 6 makeup, dump to supply container, Cascade dump to F and W, and lights cold trap dump, all normal procedures, plus an alternate procedure for trapping light gases

  8. 40 CFR 68.52 - Operating procedures.

    Science.gov (United States)

    2010-07-01

    ...) CHEMICAL ACCIDENT PREVENTION PROVISIONS Program 2 Prevention Program § 68.52 Operating procedures. (a) The... for safely conducting activities associated with each covered process consistent with the safety information for that process. Operating procedures or instructions provided by equipment manufacturers or...

  9. Update on Nonsurgical Lung Volume Reduction Procedures

    Directory of Open Access Journals (Sweden)

    J. Alberto Neder

    2016-01-01

    Full Text Available There has been a surge of interest in endoscopic lung volume reduction (ELVR strategies for advanced COPD. Valve implants, coil implants, biological LVR (BioLVR, bronchial thermal vapour ablation, and airway stents are used to induce lung deflation with the ultimate goal of improving respiratory mechanics and chronic dyspnea. Patients presenting with severe air trapping (e.g., inspiratory capacity/total lung capacity (TLC 225% predicted and thoracic hyperinflation (TLC > 150% predicted have the greatest potential to derive benefit from ELVR procedures. Pre-LVRS or ELVR assessment should ideally include cardiological evaluation, high resolution CT scan, ventilation and perfusion scintigraphy, full pulmonary function tests, and cardiopulmonary exercise testing. ELVR procedures are currently available in selected Canadian research centers as part of ethically approved clinical trials. If a decision is made to offer an ELVR procedure, one-way valves are the first option in the presence of complete lobar exclusion and no significant collateral ventilation. When the fissure is not complete, when collateral ventilation is evident in heterogeneous emphysema or when emphysema is homogeneous, coil implants or BioLVR (in that order are the next logical alternatives.

  10. Caustic addition system operability test procedure

    Energy Technology Data Exchange (ETDEWEB)

    Parazin, R.E.

    1994-11-01

    This test procedure provides instructions for performing operational testing of the major components of the 241-AN-107 Caustic Addition System by WHC and Kaiser personnel at the Rotating Equipment Shop run-in pit (Bldg. 272E).

  11. Caustic addition system operability test procedure

    International Nuclear Information System (INIS)

    Parazin, R.E.

    1994-11-01

    This test procedure provides instructions for performing operational testing of the major components of the 241-AN-107 Caustic Addition System by WHC and Kaiser personnel at the Rotating Equipment Shop run-in pit (Bldg. 272E)

  12. Electronic Procedures for Medical Operations, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Electronic procedures are currently being used to document the steps in performing medical operations for the Space Shuttle and/or the International Space Station...

  13. Magnetic fusion energy. Disaster operation procedures

    International Nuclear Information System (INIS)

    1986-06-01

    In a major disaster such as an earthquake, toxic chemical release, or fire, these Disaster Operations Procedures can be used, in combination with good judgment, to minimize the risk of injury to personnel and of property damage in our laboratory, shop, and office areas. These emergency procedures apply to all personnel working within MFE/Zone-11 area including visitors, program contract personnel, and construction contract personnel

  14. Operator use of procedures during simulated emergencies

    Energy Technology Data Exchange (ETDEWEB)

    Roth, E.M.; Mumaw, R.J.; Lewis, P.M.

    1995-04-01

    This paper summarizes the results of an empirical study of nuclear power plant operator performance in cognitively demanding simulated emergencies. During emergencies operators follow highly prescriptive written procedures. The objectives of the study were to understand and document what role higher-level cognitive activities such as diagnosis, or more generally {open_quotes}situation assessment,{close_quotes} play in guiding operator performance, given that operators utilize procedures in responding to the events. The study examined crew performance in variants of two simulated emergencies: (1) an Interfacing System Loss of Coolant Accident and (2) a Loss of Heat Sink scenario. Data on operator performance were collected using training simulators at two plant sites. Up to 11 crews from each plant participated in each of two simulated emergencies for a total of 38 cases analyzed. Crew performance was videotaped and partial transcripts were produced and analyzed. The results revealed a number of instances where higher-level cognitive activities such as situation assessment and response planning enabled operators to handle aspects of the situation that were not fully addressed by the procedures. The paper summarizes these cases and their implications for the development and evaluation of training and control room aids, as well as for human reliability analyses. The full report of the study is published as NUREG/CR-6208.

  15. Operator use of procedures during simulated emergencies

    International Nuclear Information System (INIS)

    Roth, E.M.; Mumaw, R.J.; Lewis, P.M.

    1995-01-01

    This paper summarizes the results of an empirical study of nuclear power plant operator performance in cognitively demanding simulated emergencies. During emergencies operators follow highly prescriptive written procedures. The objectives of the study were to understand and document what role higher-level cognitive activities such as diagnosis, or more generally ' situation assessment,' play in guiding operator performance, given that operators utilize procedures in responding to the events. The study examined crew performance in variants of two simulated emergencies: (1) an Interfacing System Loss of Coolant Accident and (2) a Loss of Heat Sink scenario. Data on operator performance were collected using training simulators at two plant sites. Up to 11 crews from each plant participated in each of two simulated emergencies for a total of 38 cases analyzed. Crew performance was videotaped and partial transcripts were produced and analyzed. The results revealed a number of instances where higher-level cognitive activities such as situation assessment and response planning enabled operators to handle aspects of the situation that were not fully addressed by the procedures. The paper summarizes these cases and their implications for the development and evaluation of training and control room aids, as well as for human reliability analyses. The full report of the study is published as NUREG/CR-6208

  16. Control procedure for well drilling operations

    Energy Technology Data Exchange (ETDEWEB)

    Bourdon, J C

    1988-09-09

    A control procedure of rotary drilling operations is proposed. It uses the Drill off test. The drill-off test permits to determine the rock drill speed variation as a function of the wright applied on the top of the pipe. We can deduce from that a rock drill wear parameter. The method permits to prevent a rupture and its grave economic consequences.

  17. 40 CFR 68.69 - Operating procedures.

    Science.gov (United States)

    2010-07-01

    ...) CHEMICAL ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.69 Operating procedures. (a) The... presented by, the chemicals used in the process; (ii) Precautions necessary to prevent exposure, including... instructions for safely conducting activities involved in each covered process consistent with the process...

  18. Military Publications, Index of Test Operations Procedures

    Science.gov (United States)

    1981-10-01

    serial number, aad design information for majur components. Prescribes vehicle, major component, and system descrip- tive elements required; such as...mount operating characteristics. Discusses preparation for test, instrumentation, and facil- ities. Describes procedures for force measurement, carriage...backlash and accuracy, turret friction, gun balance, manual handcrank force , manual response ratio, weapon and sighting system backlash, power controller

  19. Development of symptoms-oriented operating procedures

    International Nuclear Information System (INIS)

    Colquhoun, R.

    1984-01-01

    Until recently, the formal treatment of control room procedures for upset conditions in nuclear power plants has been event-oriented. This orientation was not so much a reflection of power plant operating practice as it was a reflection of design-oriented thinking - design-basis events, therefore event-oriented procedures. Event orientation is not common in other professions. In the medical profession, for example, the stabilization of vital functions through a symptoms-oriented approach has priority over diagnosis and prognosis. The American nuclear power industry has initiated programs for the development and application of a symptoms-oriented approach for handling upset conditions. Canadian programs have independently paralleled the US programs. This article describes the rationale and current applications of the Canadian programs and identifies the relevance of a generic symptoms-based emergency procedure to current operating practices

  20. Diagnostic imaging procedure volume in the United States

    International Nuclear Information System (INIS)

    Johnson, J.L.; Abernathy, D.L.

    1983-01-01

    Comprehensive data on 1979 and 1980 diagnostic imaging procedure volume were collected from a stratified random sample of U.S. short-term general-care hospitals and private practices of radiologists, cardiologists, obstetricians/gynecologists, orthopedic surgeons, and neurologists/neurosurgeons. Approximately 181 million imaging procedures (within the study scope) were performed in 1980. Despite the rapidly increasing use of newer imaging methods, plain film radiography (140.3 million procedures) and contrast studies (22.9 million procedures) continue to comprise the vast majority of diagnostic imaging volume. Ultrasound, computed tomography, nuclear medicine, and special procedures make up less than 10% of total diagnostic imaging procedures. Comparison of the data from this study with data from an earlier study indicates that imaging procedure volume in hospitals expanded at an annual growth rate of almost 8% from 1973 to 1980

  1. Energy conservation aircraft design and operational procedures

    Energy Technology Data Exchange (ETDEWEB)

    Poisson-Quinton, P.

    1978-01-01

    The paper reviews studies associated with improved fuel efficiency. Several aircraft design concepts are described including: (1) increases in aerodynamic efficiency through decreased friction drag, parasitic drag, and drag due to lift, (2) structural efficiency and the implementation of composite materials, (3) active control technology, (4) the optimization of airframe-engine integration, and (5) VTOL and STOL concepts. Consideration is also given to operational procedures associated with flight management, terminal-area operations, and the influence of environmental noise constraints on fuel economy.

  2. Comparing the operators' behavior in conducting emergency operating procedures with the complexity of procedural steps

    International Nuclear Information System (INIS)

    Park, Jin Kyun; Jung, Won Dea

    2003-01-01

    Many kinds of procedures have been used to reduce the operators' workload throughout various industries. However, significant portion of accidents or incidents was caused by procedure related human errors that are originated from non-compliance of procedures. According to related studies, several important factors for non-compliance behavior have been identified, and one if them is the complexity of procedures. This means that comparing the change of the operators' behavior with the complexity of procedures may be meaningful for investigating plausible reasons for the operators' non-compliance behavior. In this study, emergency training records were collected using a full scope simulator in order to obtain data related to the operators' non-compliance behavior. And then, collected data are compared with the complexity of procedural steps. As the result, two remarkable relationships are found, which indicate that the operators' behavior could be reasonably characterized by the complexity of procedural steps. Thus, these relationships can be used as meaningful clues not only to scrutinize the reason of non-compliance behavior but also to suggest appropriate remedies for the reduction of non-compliance behavior that can result in procedure related human errors

  3. RTOD-photo operations and procedures manual

    Energy Technology Data Exchange (ETDEWEB)

    1966-03-15

    This document presents a survey of the EG&G NRDS photographic operation in four major sections and includes the work scope, procedures, some technical backgrounding and operational information. Two sections, Instrumentation and Photo Systems, include the areas of direct responsibilities while a section on Film Handling and Coordination and a section covering special information, pertinent to the project, are included to adequately complete this survey. The photographic group is housed in two trailers within the control point area at NRDS and from these trailers provides photographic support at a number of locations. Four camera bunkers, three camera towers, a kinescope system, a microfilm system and remote camera controls comprise the facilities that the group maintains and operates outside these trailers. The work load includes major items such as: motion picture coverage of the nuclear rocket engine tests, data record microfilming, kinescope recording, and documentary coverage of the company related operational responsibilities. In addition, a number of minor photographic services are extended, when required. The nature of the work, because of its importance within the research and development efforts at NRDS, requires optimum quality and efficiency throughout. The many procedures outlined here have been designed to satisfy these requirements.

  4. Operating-procedure system at Savannah River Plant

    International Nuclear Information System (INIS)

    Tope, C.W.

    1981-05-01

    Three types of procedures are widely used at SRP: Du Pont Savannah Operating Logsheet, Du Pont Savannah Operating Procedure, and Plant Manual. This document briefly reviews originating of the procedures, their preparation, control, and indexing

  5. INERT Atmosphere confinement operability test procedure

    International Nuclear Information System (INIS)

    RISENMAY, H.R.

    1999-01-01

    This Operability Test Procedure (OTP) provides instructions for testing operability of the Inert Atmosphere Confinement (IAC). The Inert Atmosphere Confinement was designed and built for opening cans of metal items that might have hydrided surfaces. Unreviewed Safety Question (USQ) PFP-97-005 addresses the discovery of suspected plutonium hydride forming on plutonium metal currently stored in the Plutonium Finishing Plant vaults. Plutonium hydride reacts quickly with air, liberating energy. The Inert Atmosphere Confinement was designed to prevent this sudden liberation of energy by opening the material in an inert argon atmosphere instead of the normal glovebox atmosphere. The IAC is located in glovebox HC-21A, room 230B of the 234-5Z Building at the Plutonium Finishing Plant (PFP) in the 200-West Area of the Hanford Site

  6. Small Aircraft Transportation System Higher Volume Operations Concept

    Science.gov (United States)

    Abbott, Terence S.; Consiglio, Maria C.; Baxley, Brian T.; Williams, Daniel M.; Jones, Kenneth M.; Adams, Catherine A.

    2006-01-01

    This document defines the Small Aircraft Transportation System (SATS) Higher Volume Operations concept. The general philosophy underlying this concept is the establishment of a newly defined area of flight operations called a Self-Controlled Area (SCA). Within the SCA, pilots would take responsibility for separation assurance between their aircraft and other similarly equipped aircraft. This document also provides details for a number of off-nominal and emergency procedures which address situations that could be expected to occur in a future SCA. The details for this operational concept along with a description of candidate aircraft systems to support this concept are provided.

  7. Graphical calculus of volume, inverse volume and Hamiltonian operators in loop quantum gravity

    Energy Technology Data Exchange (ETDEWEB)

    Yang, Jinsong [Guizhou University, Department of Physics, Guiyang (China); Academia Sinica, Institute of Physics, Taipei (China); Ma, Yongge [Beijing Normal University, Department of Physics, Beijing (China)

    2017-04-15

    To adopt a practical method to calculate the action of geometrical operators on quantum states is a crucial task in loop quantum gravity. In this paper, the graphical calculus based on the original Brink graphical method is applied to loop quantum gravity along the line of previous work. The graphical method provides a very powerful technique for simplifying complicated calculations. The closed formula of the volume operator and the actions of the Euclidean Hamiltonian constraint operator and the so-called inverse volume operator on spin-network states with trivalent vertices are derived via the graphical method. By employing suitable and non-ambiguous graphs to represent the action of operators as well as the spin-network states, we use the simple rules of transforming graphs to obtain the resulting formula. Comparing with the complicated algebraic derivation in some literature, our procedure is more concise, intuitive and visual. The resulting matrix elements of the volume operator is compact and uniform, fitting for both gauge-invariant and gauge-variant spin-network states. Our results indicate some corrections to the existing results for the Hamiltonian operator and inverse volume operator in the literature. (orig.)

  8. Guideline for the preparation of safe operating procedures

    International Nuclear Information System (INIS)

    Stinnett, L.; Carroll, M.M.; Crooks, D.L.; Doyle, J.R.; Jeblick, H.G.; Kessel, D.S.; Tippy, M.W.; Stuckey, J.M.

    1981-03-01

    These procedures are written for activities that involve the use of explosives, dangerous chemicals, radioactive materials, hazardous sytems, and for certain types of operational facilities which present hazards. This guideline presents a suggested Safe Operating Procedures format

  9. The Small Aircraft Transportation System (SATS), Higher Volume Operations (HVO) Off-Nominal Operations

    Science.gov (United States)

    Baxley, B.; Williams, D.; Consiglio, M.; Conway, S.; Adams, C.; Abbott, T.

    2005-01-01

    The ability to conduct concurrent, multiple aircraft operations in poor weather, at virtually any airport, offers an important opportunity for a significant increase in the rate of flight operations, a major improvement in passenger convenience, and the potential to foster growth of charter operations at small airports. The Small Aircraft Transportation System, (SATS) Higher Volume Operations (HVO) concept is designed to increase traffic flow at any of the 3400 nonradar, non-towered airports in the United States where operations are currently restricted to one-in/one-out procedural separation during Instrument Meteorological Conditions (IMC). The concept's key feature is pilots maintain their own separation from other aircraft using procedures, aircraft flight data sent via air-to-air datalink, cockpit displays, and on-board software. This is done within the Self-Controlled Area (SCA), an area of flight operations established during poor visibility or low ceilings around an airport without Air Traffic Control (ATC) services. The research described in this paper expands the HVO concept to include most off-nominal situations that could be expected to occur in a future SATS environment. The situations were categorized into routine off-nominal operations, procedural deviations, equipment malfunctions, and aircraft emergencies. The combination of normal and off-nominal HVO procedures provides evidence for an operational concept that is safe, requires little ground infrastructure, and enables concurrent flight operations in poor weather.

  10. 21 CFR 120.6 - Sanitation standard operating procedures.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 2 2010-04-01 2010-04-01 false Sanitation standard operating procedures. 120.6... Provisions § 120.6 Sanitation standard operating procedures. (a) Sanitation controls. Each processor shall have and implement a sanitation standard operating procedure (SSOP) that addresses sanitation...

  11. Operative volume and outcomes of cerebrovascular neurosurgery in children.

    Science.gov (United States)

    Bekelis, Kimon; Connolly, Ian D; Do, Huy M; Choudhri, Omar

    2016-11-01

    OBJECTIVE The impact of procedural volume on the outcomes of cerebrovascular surgery in children has not been determined. In this study, the authors investigated the association of operative volume on the outcomes of cerebrovascular neurosurgery in pediatric patients. METHODS The authors performed a cohort study of all pediatric patients who underwent a cerebrovascular procedure between 2003 and 2012 and were registered in the Kids' Inpatient Database (KID). To control for confounding, the authors used multivariable regression models, propensity-score conditioning, and mixed-effects analysis to account for clustering at the hospital level. RESULTS During the study period, 1875 pediatric patients in the KID underwent cerebrovascular neurosurgery and met the inclusion criteria for the study; 204 patients (10.9%) underwent aneurysm clipping, 446 (23.8%) underwent coil insertion for an aneurysm, 827 (44.1%) underwent craniotomy for arteriovenous malformation resection, and 398 (21.2%) underwent bypass surgery for moyamoya disease. Mixed-effects multivariable regression analysis revealed that higher procedural volume was associated with fewer inpatient deaths (OR 0.58; 95% CI 0.40-0.85), a lower rate of discharges to a facility (OR 0.87; 95% CI 0.82-0.92), and shorter length of stay (adjusted difference -0.22; 95% CI -0.32 to -0.12). The results in propensity-adjusted multivariable models were robust. CONCLUSIONS In a national all-payer cohort of pediatric patients who underwent a cerebrovascular procedure, the authors found that higher procedural volume was associated with fewer deaths, a lower rate of discharges to a facility, and decreased lengths of stay. Regionalization initiatives should include directing children with such rare pathologies to a center of excellence.

  12. Managing Operating Procedures in Distributed Collaborative Projects

    Science.gov (United States)

    Hool, A.; Beuzelin Ollivier, M.-G.; Roubert, F.

    2013-04-01

    In recent years, large distributed collaborative projects have become very prominent in scientific research, allowing exchanges between laboratories located in different institutions and countries and between various domains of competence. Particularly the work on nanotoxicity - a field which has only been under investigation for a few years and is still lacking regulatory framework - highlighted the need for well-controlled methods, as well as rules for the handling and disposal of used materials. To obtain comparable and reproducible results of experiments conducted in a distributed context, the standardisation and proper documentation of the applied methods is crucial. The European project NanoDiaRA, whose aim is to develop nanoparticles and biomarkers for the early diagnosis of inflammatory disease, faces this situation as it involves 15 European partners and brings together different scientific cultures and professional backgrounds. Protocols especially developed for Superparamagnetic Iron Oxide Nanoparticles and a management system were designed and implemented within the NanoDiaRA project to fulfil those needs. The main goals were the establishment of standardised Standard Operating Procedures assuring transparency and reproducibility and the provision of access to these protocols to every project partner, as well as their clear allocation to carry out precise measurements and production steps.

  13. Managing Operating Procedures in Distributed Collaborative Projects

    International Nuclear Information System (INIS)

    Hool, A; Ollivier, M-G Beuzelin; Roubert, F

    2013-01-01

    In recent years, large distributed collaborative projects have become very prominent in scientific research, allowing exchanges between laboratories located in different institutions and countries and between various domains of competence. Particularly the work on nanotoxicity – a field which has only been under investigation for a few years and is still lacking regulatory framework – highlighted the need for well-controlled methods, as well as rules for the handling and disposal of used materials. To obtain comparable and reproducible results of experiments conducted in a distributed context, the standardisation and proper documentation of the applied methods is crucial. The European project NanoDiaRA, whose aim is to develop nanoparticles and biomarkers for the early diagnosis of inflammatory disease, faces this situation as it involves 15 European partners and brings together different scientific cultures and professional backgrounds. Protocols especially developed for Superparamagnetic Iron Oxide Nanoparticles and a management system were designed and implemented within the NanoDiaRA project to fulfil those needs. The main goals were the establishment of standardised Standard Operating Procedures assuring transparency and reproducibility and the provision of access to these protocols to every project partner, as well as their clear allocation to carry out precise measurements and production steps.

  14. Infection Risk in Sterile Operative Procedures.

    Science.gov (United States)

    Tacconelli, Evelina; Müller, Niklas F; Lemmen, Sebastian; Mutters, Nico T; Hagel, Stefan; Meyer, Elisabeth

    2016-04-22

    The main objective of hospital hygiene and infection prevention is to protect patients from preventable nosocomial infections. It was recently stated that the proper goal should be for zero infection rates in sterile surgical procedures. In this article, we attempt to determine whether this demand is supported by the available literature. We systematically searched the Medline and EMBASE databases for studies published in the last 10 years on the efficacy of infection control measures and carried out a meta-analysis according to the PRISMA tool. We used the following search terms: "aseptic surgery," "intervention," "surgical site infection," "nosocomial infection," "intervention," and "prevention." 2277 articles were retrieved, of which 204 were acquired in full text and analyzed. The quantitative analysis included 7 prospective cohort studies on the reduction of nosocomial infection rates after aseptic surgery. The measures used included training sessions, antibiotic prophylaxis, and operative-site disinfection and cleaning techniques. These interventions succeeded in reducing postoperative wound infections (relative risk (RR] 0.99 [0.98; 1.00]). Subgroup analyses on antibiotic prophylaxis (RR 0.99 [0.98; 1.01]) and noncontrolled trials (RR 0.97 [0.92; 1.02]) revealed small, insignificant effects. A multimodal approach with the participation of specialists from various disciplines can further reduce the rate of postoperative infection. A reduction to zero is not realistic and is not supported by available evidence.

  15. Emergency operation procedure navigation to avoid commission errors

    International Nuclear Information System (INIS)

    Gofuku, Akio; Ito, Koji

    2004-01-01

    New types of operation control system equipped with a large screen and CRT-based operation panels have been installed in newly constructed nuclear power plants. The operators can share important information of plant conditions by the large screen. The operation control system can know the operations by operators through the computers connected to the operation panels. The software switches placed in the CRT-based operation panels have a problem such that operators may make an error to manipulate an irrelevant software switch with their current operation. This study develops an operation procedure navigation technique to avoid this kind of commission errors. The system lies between CRT-based operation panels and plant control systems and checks an operation by operators if it follows the operation procedure of operation manuals. When the operation is a right one, the operation is executed as if the operation command is directly transmitted to control systems. If the operation does not follow the operation procedure, the system warns the commission error to operators. This paper describes the operation navigation technique, format of base operation model, and a proto-type operation navigation system for a three loop pressurized water reactor plant. The validity of the proto-type system is demonstrated by the operation procedure navigation for a steam generator tube rupture accident. (author)

  16. Operational procedures - industry observations and opportunities for improvement

    International Nuclear Information System (INIS)

    Davey, E.

    2003-01-01

    The purpose of this paper is to relate some of the commonly encountered problems with operational procedures in the nuclear industry and offer practical suggestions for their elimination. The paper is based on recent consultant experience in assisting industry clients with human performance related design and assessment initiatives. Operational procedures are a key part of an integrated system design. Procedures provide the specified instructions for actions people are to undertake in operating a facility to achieve production and safety goals. While organizations continue to make substantial investments in procedure development and maintenance, problems with procedures continue to occur, as evidenced through operating inefficiencies, errors, and events. The paper reviews the role procedures play in facility operations, comments on current development and maintenance practices, discusses the extent of human performance related problems attributed to procedure deficiencies, reviews commonly encountered problems with design and implementation of procedures, and offers suggestions on how some of these issues might be addressed in the future. (author)

  17. MITS Feed and Withdrawal Subsystem: operating procedures

    International Nuclear Information System (INIS)

    Brown, W.S.

    1980-01-01

    This procedure details the steps involved in establishing closed loop flows, providing UF 6 vapor to the FEED header of the Sampling Subsystem and returning it through the PRODUCT and TAILS headers via the F and W recycle valves. It is essentially a Startup Procedure

  18. New application of procedures computer to normal operating procedures

    Energy Technology Data Exchange (ETDEWEB)

    Medrano Carbajo, J.; Mendez Salguero, J.

    2012-07-01

    Currently, existing technologies in the operating power plants accused increasingly more problems of obsolescence and replacement of equipment supply. For this reason are spreading, to a greater or lesser extent, the projects of migration from analogue to digital technology systems. These systems, in line with the current situation of the industry, provide solutions to such problems and other advantages.

  19. Techniques for preparing flowchart-format emergency operating procedures: Background (Sections 1.0-9.0)

    International Nuclear Information System (INIS)

    Barnes, V.E.; Moore, C.J.; Wieringa, D.R.; Isakson, C.S.; Kono, B.K.; Gruel, R.L.

    1989-01-01

    This two-volume report describes the activities, findings, and recommendations of a project entitled ''Techniques for Presenting Flowchart-Format Emergency Operating Procedures.'' The project team surveyed the literature pertaining to flowcharts, reviewed existing flowchart emergency operating procedures (EOPs), interviewed consultants who produced flowcharts, and interviewed reactor operator licensing examiners about the use of flowcharts in nuclear power plants. This document, and Volume 1 of this report, discusses the use of flowchart-format EOPs in nuclear power plants and presents issue to be addressed in the design and implementation of flowchart EOPs. 66 refs., 76 figs., 2 tabs

  20. Operability test procedure for 211BA flow proportional sampler

    International Nuclear Information System (INIS)

    Weissenfels, R.D.

    1994-01-01

    The purpose of this operability test procedure (OTP) is to verify the 211-BA flow proportional sampler system and components function correctly as intended by design. System test will include the sampling system, all associated instrumentation, and Facility Process Monitor and Control System (FPMCS). The combined chemical sewer stream from B Plant flows through sump 211BA-SMP-01 located in 211-BA and is continuously monitored for gamma and beta radiation and pH. 211-BA has been upgraded to include a flow proportional sampler. A specified sample volume will be withdrawn at programmed intervals from the 211BA sump and deposited in a 19 liter plastic carboy. The sampler will be programmed per the vendor installation and operations manual by B Plant instrument maintenance personnel. Samples will be taken during five consecutive sample cycles with the sample volumes and sample frequencies recorded for comparison purposes. Additional tests related to the sampler include the alarm circuitry for loss of power and failure to obtain sample

  1. 14 CFR 25.1585 - Operating procedures.

    Science.gov (United States)

    2010-01-01

    ...) Non-normal procedures for malfunction cases and failure conditions involving the use of special... envelopes, determined under § 25.251 must be furnished. The buffet onset envelopes presented may reflect the...

  2. Test report - caustic addition system operability test procedure

    International Nuclear Information System (INIS)

    Parazin, R.E.

    1995-01-01

    This Operability Test Report documents the test results of test procedure WHC-SD-WM-OTP-167 ''Caustic Addition System Operability Test Procedure''. The Objective of the test was to verify the operability of the 241-AN-107 Caustic Addition System. The objective of the test was met

  3. Operating manual for the High Flux Isotope Reactor. Volume I. Description of the facility

    International Nuclear Information System (INIS)

    1982-09-01

    This volume contains a comprehensive description of the High Flux Isotope Reactor Facility. Its primary purpose is to supplement the detailed operating procedures, providing the reactor operators with background information on the various HFIR systems. The detailed operating procdures are presented in another report

  4. Operating manual for the High Flux Isotope Reactor. Volume I. Description of the facility

    Energy Technology Data Exchange (ETDEWEB)

    1982-09-01

    This volume contains a comprehensive description of the High Flux Isotope Reactor Facility. Its primary purpose is to supplement the detailed operating procedures, providing the reactor operators with background information on the various HFIR systems. The detailed operating procdures are presented in another report.

  5. The effect of economic downturn on the volume of surgical procedures: A systematic review.

    Science.gov (United States)

    Fujihara, Nasa; Lark, Meghan E; Fujihara, Yuki; Chung, Kevin C

    2017-08-01

    Economic downturn can have a wide range of effects on medicine at both individual and national levels. We aim to describe these effects in relation to surgical volume to guide future planning for physician specialization, patient expectations in the face of economic crises, or estimating healthcare expenditure. We hypothesized that because of high out-of-pocket costs, cosmetic procedure volumes would be most affected by economic decline. A systematic review was conducted using MEDLINE, Embase, and ABI/INFORMS. The main search terms were "economic recession" and "surgical procedures, operative". Studies were included if surgical volumes were measured and economic indicators were used as predictors of economic conditions. Twelve studies were included, and the most common subject was cosmetic (n = 5), followed by orthopedic (n = 2) and cardiac surgeries (n = 2). The majority of studies found that in periods of economic downturn, surgical volume decreased. Among the eight studies using Pearson's correlation analysis, there were no significant differences between cosmetic procedures and other elective procedures, indicating that cosmetic procedures may display trends similar to those of non-cosmetic elective procedures in periods of economic downturn. Surgical volume generally decreased when economic indicators declined, observed for both elective and non-elective surgery fields. However, a few specific procedure volumes such as vasectomy and caesarean section for male babies increased during the economic downturn. Knowledge of these trends can be useful for future surgical planning and distribution of healthcare resources. Copyright © 2017 IJS Publishing Group Ltd. Published by Elsevier Ltd. All rights reserved.

  6. Radiation dose to the operator during fluoroscopically guided spine procedures

    Energy Technology Data Exchange (ETDEWEB)

    Roccatagliata, Luca; Pravata, Emanuele; Cianfoni, Alessandro [Department of Neuroradiology, Neurocenter of Southern Switzerland, Ospedale Regionale di Lugano, Lugano (Switzerland); Presilla, Stefano [Unita di Fisica Medica, Ente Ospedaliero Cantonale (EOC), Bellinzona (Switzerland)

    2017-09-15

    Fluoroscopy is widely used to guide diagnostic and therapeutic spine procedures. The purpose of this study was to quantify radiation incident on the operator (operator Air Kerma) during a wide range of fluoroscopy-guided spine procedures and its correlation with the amount of radiation incident on the patient (Kerma Area Product - KAP). We retrospectively included 57 consecutive fluoroscopically guided spine procedures. KAP [Gy cm{sup 2}] and total fluoroscopy time were recorded for each procedure. An electronic dosimeter recorded the operator Air Kerma [μGy] for each procedure. Operator Air Kerma for each procedure, correlation between KAP and operator Air Kerma, and between KAP and fluoroscopy time was obtained. Operator Air Kerma was widely variable across procedures, with median value of 6.4 μGy per procedure. Median fluoroscopy time and median KAP per procedure were 2.6 min and 4.7 Gy cm{sup 2}, respectively. There was correlation between operator Air Kerma and KAP (r{sup 2} = 0.60), with a slope of 1.6 μGy Air Kerma per unit Gy cm{sup 2} KAP incident on the patient and between fluoroscopy time and KAP (r{sup 2} = 0.63). Operator Air Kerma during individual fluoroscopy-guided spine procedures can be approximated from the commonly and readily available information of the total amount of radiation incident on the patient, measured as KAP. (orig.)

  7. Small Aircraft Transportation System, Higher Volume Operations Concept: Off-Nominal Operations

    Science.gov (United States)

    Abbott, Terence S.; Consiglio, Maria C.; Baxley, Brian T.; Williams, Daniel M.; Conway, Sheila R.

    2005-01-01

    This document expands the Small Aircraft Transportation System, (SATS) Higher Volume Operations (HVO) concept to include off-nominal conditions. The general philosophy underlying the HVO concept is the establishment of a newly defined area of flight operations called a Self-Controlled Area (SCA). During periods of poor weather, a block of airspace would be established around designated non-towered, non-radar airports. Aircraft flying enroute to a SATS airport would be on a standard instrument flight rules flight clearance with Air Traffic Control providing separation services. Within the SCA, pilots would take responsibility for separation assurance between their aircraft and other similarly equipped aircraft. Previous work developed the procedures for normal HVO operations. This document provides details for off-nominal and emergency procedures for situations that could be expected to occur in a future SCA.

  8. Research on Operating Procedure Development in View of RCM Theory

    International Nuclear Information System (INIS)

    Shi, J.

    2015-01-01

    The operation of NPPs (nuclear power plants) is closely related to SSCs (Structure, System and Component) function implementations and failure recoveries, and strictly follows operating procedure. The philosophy of RCM (Reliability Centered Maintenance) which is a widely-used systematic engineering approach in industry focusing on likewise facility functions and effectiveness of maintenance is accepted in relative analysis of NPPs operation in this paper. Based on the theory of RCM, the paper will discuss general logic of operating procedure development and framework optimization as well combining NPPs engineering design. Since the quality of operating procedures has a significant impact on the safe and reliable operation of NPPs, the paper provides a proposed operating procedure development logic diagramme for reference for the procedure optimization task ahead. (author)

  9. Developing control room operator selection procedures

    International Nuclear Information System (INIS)

    Bosshardt, M.J.; Bownas, D.A.

    1979-01-01

    PDRI is performing a two-year study to identify the tasks performed and attributes required in electric power generating plant operating jobs, and focusing on the control room operator position. Approximately 65 investor-owned utilities are participating in the study

  10. ORNL Pocket Meter Program: internal operating procedures

    International Nuclear Information System (INIS)

    Berger, C.D.; Miller, J.H.; Dunsmore, M.R.

    1984-12-01

    The ORNL Pocket Meter Program is designed for auditing the approximate photon radiation exposure of Oak Ridge National Laboratory (ORNL) radiation workers. Although pocket meters are considered to be a secondary personnel dosimetry system at ORNL, they are valuable indicators of unplanned exposures if proper procedures are followed for testing, calibrating, deploying, wearing, processing, and recording data. 4 figures, 1 table

  11. Procedures of Operation at Cranbrook Central Library.

    Science.gov (United States)

    Cranbrook Institutions, Bloomfield Hills, MI. Central Library.

    This manual outlines the ordering, cataloging and classification, and processing procedures for books, periodicals, government documents, and non-book materials for a central library serving three schools--a co-ed elementary school and separate junior-senior high schools for boys and girls--and four special libraries--a fine and rare books…

  12. MITS Feed and Withdrawal Subsystem: operating procedures

    International Nuclear Information System (INIS)

    Brown, W.S.

    1980-01-01

    This procedure details the steps involved in filling two of the four MITS (Machine Interface Test System) Feed and Withdrawal subsystem main traps and the Sample/Inventory Make-up Pipette with uranium hexafluoride from the ''AS RECEIVED'' UF 6 supply

  13. Guideline for the preparation of safe operating procedures

    International Nuclear Information System (INIS)

    Stinnett, L.; Armbrust, E.F.; Christy, V.W.; Doyle, J.R.; Kesinger, J.H.

    1977-03-01

    Sandia Laboratories Safe Operating Procedures (SOP) are written for activities which involve the use of explosives, dangerous chemicals, radioactive materials, hazardous systems, and certain types of operational facilities which present hazards. This guideline presents a suggested SOP format

  14. Operating procedures: Fusion Experiments Analysis Facility

    Energy Technology Data Exchange (ETDEWEB)

    Lerche, R.A.; Carey, R.W.

    1984-03-20

    The Fusion Experiments Analysis Facility (FEAF) is a computer facility based on a DEC VAX 11/780 computer. It became operational in late 1982. At that time two manuals were written to aid users and staff in their interactions with the facility. This manual is designed as a reference to assist the FEAF staff in carrying out their responsibilities. It is meant to supplement equipment and software manuals supplied by the vendors. Also this manual provides the FEAF staff with a set of consistent, written guidelines for the daily operation of the facility.

  15. Operating procedures: Fusion Experiments Analysis Facility

    International Nuclear Information System (INIS)

    Lerche, R.A.; Carey, R.W.

    1984-01-01

    The Fusion Experiments Analysis Facility (FEAF) is a computer facility based on a DEC VAX 11/780 computer. It became operational in late 1982. At that time two manuals were written to aid users and staff in their interactions with the facility. This manual is designed as a reference to assist the FEAF staff in carrying out their responsibilities. It is meant to supplement equipment and software manuals supplied by the vendors. Also this manual provides the FEAF staff with a set of consistent, written guidelines for the daily operation of the facility

  16. Operating experience and procedures at the tritium systems test assembly

    International Nuclear Information System (INIS)

    Carlson, R.V.; Binning, K.E.; Cole, S.P.; Jenkins, E.M.; Wilhelm, R.C.; Cole, S.P.

    1988-01-01

    Operating procedures are important for the safe and efficient operation of the Tritium Systems Test Assembly (TSTA). TSTA has been operating for four years with tritium in a safe and efficient manner. The inventory of tritium in the process loop is 100 grams and several milestone runs have been completed. This paper describes the methods used to operate TSTA. 3 refs., 1 fig

  17. Standard Operating Procedure for Accelerated Corrosion Testing at ARL

    Science.gov (United States)

    2017-11-01

    ARL-TN-0855 ● NOV 2017 US Army Research Laboratory Standard Operating Procedure for Accelerated Corrosion Testing at ARL by... Corrosion Testing at ARL by Thomas A Considine Weapons and Materials Research Directorate, ARL Approved for public...November 2017 2. REPORT TYPE Technical Note 3. DATES COVERED (From - To) 4. TITLE AND SUBTITLE Standard Operating Procedure for Accelerated

  18. Operating procedures for the Pajarito Site Critical Assembly Facility

    International Nuclear Information System (INIS)

    Malenfant, R.E.

    1983-03-01

    Operating procedures consistent with DOE Order 5480.2, Chapter VI, and the American National Standard Safety Guide for the Performance of Critical Experiments are defined for the Pajarito Site Critical Assembly Facility of the Los Alamos National Laboratory. These operating procedures supersede and update those previously published in 1973 and apply to any criticality experiment performed at the facility

  19. Load research manual. Volume 1. Load research procedures

    Energy Technology Data Exchange (ETDEWEB)

    Brandenburg, L.; Clarkson, G.; Grund, Jr., C.; Leo, J.; Asbury, J.; Brandon-Brown, F.; Derderian, H.; Mueller, R.; Swaroop, R.

    1980-11-01

    This three-volume manual presents technical guidelines for electric utility load research. Special attention is given to issues raised by the load data reporting requirements of the Public Utility Regulatory Policies Act of 1978 and to problems faced by smaller utilities that are initiating load research programs. In Volumes 1 and 2, procedures are suggested for determining data requirements for load research, establishing the size and customer composition of a load survey sample, selecting and using equipment to record customer electricity usage, processing data tapes from the recording equipment, and analyzing the data. Statistical techniques used in customer sampling are discussed in detail. The costs of load research also are estimated, and ongoing load research programs at three utilities are described. The manual includes guides to load research literature and glossaries of load research and statistical terms.

  20. New experimental procedure for measuring volume magnetostriction on powder samples

    International Nuclear Information System (INIS)

    Rivero, G.; Multigner, M.; Valdes, J.; Crespo, P.; Martinez, A.; Hernando, A.

    2005-01-01

    Conventional techniques used for volume magnetostriction measurements, as strain gauge or cantilever method, are very useful for ribbons or thin films but cannot be applied when the samples are in powder form. To overcome this problem a new experimental procedure has been developed. In this work, the experimental set-up is described, together with the results obtained in amorphous FeCuZr powders, which exhibit a strong dependence of the magnetization on the strength of the applied magnetic field. The magnetostriction measurements presented in this work point out that this dependence is related to a magnetovolume effect

  1. Operational limits and conditions and operating procedures for research reactors. Safety guide

    International Nuclear Information System (INIS)

    2008-01-01

    This publication provides practical guidance on all important aspects of developing, formulating and presenting the operational limits and conditions as well as the operating procedures for research reactors. It covers the concept of operational limits and conditions, their content, and the responsibilities of the operating organization with respect to their establishment, modification, documentation and compliance. The guidance also covers the training of operating personnel on performing periodic testing, established by the operational limits and conditions, and operating procedures

  2. Operating Procedures to Identify Wastes of Decommissioning

    International Nuclear Information System (INIS)

    Gatea, M.A.

    2016-01-01

    There are a number of sites in Iraq which have been used for nuclear activities and which contain potentially significant amounts of radioactive material. Many of these sites suffered substantial physical damage during the Gulf Wars as well as the challenging of the difficult security situation in the country.The destruction of the former nuclear facilities during the 1991 Gulf war aggravated the problem. As a result of these events, many of these nuclear facilities have lost their containment of the radioactive material and it now has an increased potential to be dispersed into the environment.Iraqi Decommissioning Directorate (IDD) is one of the Ministry of Science and Technology (MoST) formations. It deals with decommissioning of former Iraqi nuclear sites. It considers a producer of radioactive waste.Therefore, waste management represents the vital requirement to work accomplishment.The work carries out on-site waste pretreatment which considers as a minimization of waste management.W M is necessary to: Segregate 'at source' as much materials as possible to minimize quantities of radioactive waste, clear or exempt as much materials as possible and decontaminate and recycle as much radioactive waste as possible. And in more general terms: to control and account for radioactive waste to protect human health and the environment, to make sure we do not leave unnecessary burdens for future generations, to concentrate, contain and isolate the waste from the environment therefore, this make any releases to the environment to be restricted and subject to regulatory control.This procedure applies on-site waste pretreatment which comprises segregating, characterizing, minimizing, classifying, packaging and relocating of generated wastes during decommissioning of destroyed nuclear facilities. The stationary waste treatment activities are the responsibility of RWTD/MoST.The (RPC/MoE) is the national regulatory body during the whole radioactive waste management

  3. Operator coil monitoring Acceptance Test Procedure

    International Nuclear Information System (INIS)

    Erhart, M.F.

    1995-01-01

    The readiness of the Data Acquisition and Control System (DACS) to provide monitoring and control of the Programmable Logic Controller (PLC) abort coils from the Master and RSS stations will be systematically tested during performance of this procedure. It should be noted that these are not physical abort coils but software coils controlled by the software's ladder logic. The readiness of the DACS to properly interface with the ENRAF wire level gauge installed in the SY-101 storage tank will also be tested. During this test, a verification of all abort coil indications will be conducted at the DACS Development Facility in the 306E Building by injecting an input signal for each DACS sensor that has an associated abort coil until the abort coil actuates, and then ensuring that the status of the abort coil indicated at the Master and RSS stations is correct. Each abort coil will also be tested to ensure that the ''ENABLE'' and ''DISABLE'' controls from the Master and RSS stations function correctly, and only with the use of proper passwords

  4. Body Mass Index and Operating Times in Vascular Procedures

    Directory of Open Access Journals (Sweden)

    M. Durup-Dickenson

    Full Text Available : Introduction: The influence of body mass index (BMI on operating times in central and peripheral vascular surgical procedures was investigated. Report: A national cohort of Danish patients who underwent a vascular procedure between 1983 and 2012 was used for analysis. Data were analysed with pairwise comparisons of BMI groups for operating times using the independent samples Kruskall–Wallis test. Discussion: A total of 3,255 carotid endarterectomies; 6,885 central vascular procedures; and 4,488 peripheral bypasses were included for the analysis. Median operating times for carotid endarterectomy and central vascular procedures were, respectively, 5 and 15 minutes longer in obese patients than in normal weight patients. This represents a 7% and 10% increase in median operating times, respectively. Linear and multi-adjusted linear regressions were conducted adjusting for confounders, showing a significant correlation between BMI and operating time. Obesity significantly increased the operating times in carotid endarterectomy and central vascular procedures. These may have ramifications for the individual operative stress but not necessarily on logistical operation planning. Keywords: Body mass index (BMI, Obesity, Operating time, Surgery, Vascular surgical procedures

  5. Operating procedure automation to enhance safety of nuclear power plants

    International Nuclear Information System (INIS)

    Husseiny, A.A.; Sabri, Z.A.; Adams, S.K.; Rodriguez, R.J.; Packer, D.; Holmes, J.W.

    1989-01-01

    Use of logic statements and computer assist are explored as means for automation and improvement on design of operating procedures including those employed in abnormal and emergency situations. Operating procedures for downpower and loss of forced circulation are used for demonstration. Human-factors analysis is performed on generic emergency operating procedures for three strategies of control; manual, semi-automatic and automatic, using standard emergency operating procedures. Such preliminary analysis shows that automation of procedures is feasible provided that fault-tolerant software and hardware become available for design of the controllers. Recommendations are provided for tests to substantiate the promise of enhancement of plant safety. Adequate design of operating procedures through automation may alleviate several major operational problems of nuclear power plants. Also, automation of procedures is necessary for partial or overall automatic control of plants. Fully automatic operations are needed for space applications while supervised automation of land-based and offshore plants may become the thrust of new generation of nulcear power plants. (orig.)

  6. Technical procedures for water resources, Deaf Smith County site, Texas: Volume 1: Environmental Field Program: Final draft

    International Nuclear Information System (INIS)

    1987-08-01

    This volume contains Technical Procedures pursuant to the Water Resources Site Study Plan including, determination of basin topographic characteristics, determination of channel and playa lake characteristics, operation of a stream gaging station, operation of a playa lake stage gaging system, and processing of data from a playa lake stage gaging system

  7. Radiation exposure of operator during various interventional procedures

    International Nuclear Information System (INIS)

    Yu, In Kyu; Chung, Jin Wook; Han, Joon Koo; Park, Jae Hyung; Kang, Wee Saing

    1994-01-01

    To investigate the levels of radiation exposure of an operator which may be influenced by the wearing an apron, type of procedure, duration of fluoroscopy and operator's skill during various interventional procedures. Radiation doses were measured both inside and outside the apron(0.5 mm lead equivalent) of the operator by a film badge monitoring method and the duration of fluoroscopy was measured in 96 procedures prospectively. The procedures were 30 transcatheter arterial embolization (TAE), 25 percutaneous transhepatic biliary drainages (PTBD), 16 stone removals (SR), 15 percutaneous needle aspirations (PNCA) and 10 percutaneous nephrostomies(PCN). To assess the difference of exposure by the operator's skill, the procedures of TAE and PTBD were done separately by groups of staffs and residents. Average protective effect of the apron was 72.8%. Average radiation exposure(unit: μ Sv/procedure was 23.3 in PTBD by residents, 10.0 in PTBD by staffs, 10.0 in SR, 8.7 in TAE by residents, 7.3 in TAE by staffs, 9.0 in PCN and 6.0 in PCNA. Average radiation exposure of residents were 1.9 times greater than those of staffs. Radiation exposure was not proportionally related to the duration of fluoroscopy, but influenced by wearing an apron, various types of procedure and operator's skills

  8. The operational procedure of an electron beam accelerator

    International Nuclear Information System (INIS)

    Lee, Byung Cheol; Choi, Hwa Lim; Yang, Ki Ho; Han, Young Hwan; Kim, Sung Chan

    2008-12-01

    The KAERI(Korea Atomic Energy of Research Institute) high-power electron beam irradiation facility, operating at the energies between 0.3 MeV and 10 MeV, has provided irradiation services to users in industries, universities, and institute in various fields. This manual is for the operation of an electron beam which is established in KAERI, and describes elementary operation procedures of electron beam between 0.3 Mev and 10 MeV. KAERI Electron Accelerator facility(Daejeon, Korea) consists of two irradiators: one is a low-energy electron beam irradiator operated by normal conducting RF accelerator, the other is medium-energy irradiator operated by superconducting RF accelerator. We explain the check points of prior to operation, operation procedure of this facility and the essential parts of electron beam accelerator

  9. The operational procedure of an electron beam accelerator

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Byung Cheol; Choi, Hwa Lim; Yang, Ki Ho; Han, Young Hwan; Kim, Sung Chan

    2008-12-15

    The KAERI(Korea Atomic Energy of Research Institute) high-power electron beam irradiation facility, operating at the energies between 0.3 MeV and 10 MeV, has provided irradiation services to users in industries, universities, and institute in various fields. This manual is for the operation of an electron beam which is established in KAERI, and describes elementary operation procedures of electron beam between 0.3 Mev and 10 MeV. KAERI Electron Accelerator facility(Daejeon, Korea) consists of two irradiators: one is a low-energy electron beam irradiator operated by normal conducting RF accelerator, the other is medium-energy irradiator operated by superconducting RF accelerator. We explain the check points of prior to operation, operation procedure of this facility and the essential parts of electron beam accelerator.

  10. [Environmental investigation of ground water contamination at Wright-Patterson Air Force Base, Ohio]. Volume 3, Appendix A, Draft standard operating procedures and elements: Sampling and Analysis Plan (SAP): Phase 1, Task 4, Field Investigation, Draft

    Energy Technology Data Exchange (ETDEWEB)

    1991-10-01

    This report presents information concerning field procedures employed during the monitoring, well construction, well purging, sampling, and well logging at the Wright-Patterson Air Force Base. Activities were conducted in an effort to evaluate ground water contamination.

  11. Operational test procedure for SY tank farm replacement exhauster unit

    International Nuclear Information System (INIS)

    McClees, J.

    1995-01-01

    This operational test procedure will verify that the remaining functions not tested per WHC-SD-WM-ATP-080, or components disturbed during final installation, as well as interfaces with other tank farm equipment and remote monitoring stations are operating correctly

  12. Acquisition of Formal Operations: The Effects of Two Training Procedures.

    Science.gov (United States)

    Rosenthal, Doreen A.

    1979-01-01

    A study of 11- and 12-year-old girls indicates that either of two training procedures, method training or dimension training, can aid in the transition from concrete operational to formal operational thought by promoting a hypothesis-testing attitude. (BH)

  13. 40 CFR 160.81 - Standard operating procedures.

    Science.gov (United States)

    2010-07-01

    .... (10) Data handling, storage and retrieval. (11) Maintenance and calibration of equipment. (12... GOOD LABORATORY PRACTICE STANDARDS Testing Facilities Operation § 160.81 Standard operating procedures... test, control, and reference substances. (4) Test system observations. (5) Laboratory or other tests...

  14. No Correlation Between Work-Hours and Operative Volumes

    DEFF Research Database (Denmark)

    Kjærgaard, Jane; Sillesen, Martin; Beier-Holgersen, Randi

    2016-01-01

    OBJECTIVE: Since 2003, United States residents have been limited to an 80-hour workweek. This has prompted concerns of reduced educational quality, especially inadequate operating exposure. In contrast, the Danish surgical specialty-training program mandates a cap on working hours of 37 per week....... We hypothesize that there is no direct correlation between work-hours and operative volume achieved during surgical residency. To test the hypothesis, we compare Danish and US operative volumes achieved during surgical residency training. DESIGN: Retrospective comparative study. PARTICIPANTS...... find no difference in overall surgical volumes between Danes and US residents during their surgical training. When time in training was accounted for, differences between weekly surgical volumes achieved were minor, indicating a lack of direct correlation between weekly work-hours and operative volumes...

  15. No Correlation Between Work-Hours and Operative Volumes--A Comparison Between United States and Danish Operative Volumes Achieved During Surgical Residency.

    Science.gov (United States)

    Kjærgaard, Jane; Sillesen, Martin; Beier-Holgersen, Randi

    2016-01-01

    Since 2003, United States residents have been limited to an 80-hour workweek. This has prompted concerns of reduced educational quality, especially inadequate operating exposure. In contrast, the Danish surgical specialty-training program mandates a cap on working hours of 37 per week. We hypothesize that there is no direct correlation between work-hours and operative volume achieved during surgical residency. To test the hypothesis, we compare Danish and US operative volumes achieved during surgical residency training. Retrospective comparative study. The data from the US population was extracted from the Accreditation Council for Graduate Medical Education database for General Surgery residents from 2012 to 2013. For Danish residents, a questionnaire with case categories matching the Accreditation Council for Graduate Medical Education categories were sent to all Danish surgeons graduating the national surgical residency program in 2012 or 2013, 54 in total. In all, 30 graduated residents (55%) responded to the Danish survey. We found no significant differences in mean total major procedures (1002.4 vs 976.9, p = 0.28) performed during residency training, but comparing average major procedures per year, the US residents achieve significantly more (132.3 vs 195.4, p work-hours and operative volumes achievable. Factors other than work-hours seem to effect on operative volumes achieved during training. Copyright © 2016 Association of Program Directors in Surgery. Published by Elsevier Inc. All rights reserved.

  16. Supporting plant operation through computer-based procedures

    International Nuclear Information System (INIS)

    Martinez, Victor; Medrano, Javier; Mendez, Julio

    2014-01-01

    Digital Systems are becoming more important in controlling and monitoring nuclear power plant operations. The capabilities of these systems provide additional functions as well as support operators in making decisions and avoiding errors. Regarding Operation Support Systems, an important way of taking advantage of these features is using computer-based procedures (CBPs) tools that enhance the plant operation. Integrating digital systems in analogue controls at nuclear power plants in operation becomes an extra challenge, in contrast to the integration of Digital Control Systems in new nuclear power plants. Considering the potential advantages of using this technology, Tecnatom has designed and developed a CBP platform taking currently operating nuclear power plants as its design basis. The result is a powerful tool which combines the advantages of CBPs and the conventional analogue control systems minimizing negative effects during plant operation and integrating operation aid-systems to support operators. (authors)

  17. Extension of emergency operating procedures for severe accident management

    International Nuclear Information System (INIS)

    Chiang, S.C.

    1992-01-01

    To enhance the capability of reactor operators to cope with the hypothetical severe accident its the key issue for utilities. Taiwan Power Company has started the enhancement programs on extension of emergency operating procedures (EOPs). It includes the review of existing LOPs based on the conclusions and recommendations of probabilistic risk assessment studies to confirm the operator actions. Then the plant specific analysis for accident management strategy will be performed and the existing EOPs will be updated accordingly

  18. Operating procedures for emergency situations in EDF PWR plants

    International Nuclear Information System (INIS)

    Depond, G.; Resse, L.

    1992-01-01

    Analysis of incidents and accidents occurring at French and foreign power plants - particularly the TMI accident - and the commissioning of many units in France, as well as tests on simulators, have all demonstrated that an improvement of safety in nuclear power units depends largely on the improvement of the man-machine interface and particularly of emergency operating procedures (EOP). EDF has taken numerous actions in this direction, especially since 1979. First of all, in improving the classical approach based on event-oriented procedures: Rewriting of initial accident operating procedures with regard to their technical contents their form, and the organization of the operating team (procedures I and A); Extension of initial procedures into areas at the limits of design basis and beyond the design basis limits (procedures H). Nevertheless, this approach is subject to several weaknesses. Dependence on a precise initial diagnosis, impossibility to take into account all the conceivable accidental situations, discrepancies between the predicted pattern and the reality. These drawbacks of the event approach have led us to revise the technical conception of the EOPs, and to develop a new approach based on a continuous monitoring of the physical states of the plant and the ability to define a relationship between the physical state of the plant and the operator actions. (author). 4 figs

  19. The current status of emergency operations at a high-volume cancer center.

    Science.gov (United States)

    Komori, Koji; Kimura, Kenya; Kinoshita, Takashi; Ito, Seiji; Abe, Tetsuya; Senda, Yoshiki; Misawa, Kazunari; Ito, Yuichi; Uemura, Norihisa; Natsume, Seiji; Kawai, Ryosuke; Kawakami, Jiro; Asano, Tomonari; Iwata, Yoshinori; Kurahashi, Shintaro; Tsutsuyama, Masayuki; Shigeyoshi, Itaru; Shimizu, Yasuhiro

    2014-01-01

    This study aimed to assess the pathogenic causes, clinical conditions, surgical procedures, in-hospital mortality, and operative death associated with emergency operations at a high-volume cancer center. Although many reports have described the contents, operative procedures, and prognosis of elective surgeries in high-volume cancer centers, emergency operations have not been studied in sufficient detail. We retrospectively enrolled 28 consecutive patients who underwent emergency surgery. Cases involving operative complications were excluded. The following surgical procedures were performed during emergency operations: closure in 3 cases (10.7%), diversion in 22 cases (78.6%), ileus treatment in 2 cases (7.1%), and hemostasis in 1 case (3.6%). Closure alone was performed only once for peritonitis. Diversion was performed in 17 cases (77.3%) of peritonitis, 4 cases (18.2%) of stenosis of the gastrointestinal tract, and 1 case (4.5%) of bleeding. There was a significant overall difference (P = 0.001). The frequency of emergency operations was very low at a high-volume cancer center. However, the recent shift in treatment approaches toward nonoperative techniques may enhance the status of emergency surgical procedures. The results presented in this study will help prepare for emergency situations and resolve them as quickly and efficiently as possible.

  20. Operational waste volume projection. Revision 20

    International Nuclear Information System (INIS)

    Koreski, G.M.; Strode, J.N.

    1994-01-01

    Waste receipts to the double-shell tank system are analyzed and wastes through the year 2015 are projected based on generation trends of the past 12 months. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement. Assumptions were current as of July 1994

  1. Pertinent anatomy and analysis for midface volumizing procedures.

    Science.gov (United States)

    Surek, Christopher C; Beut, Javier; Stephens, Robert; Jelks, Glenn; Lamb, Jerome

    2015-05-01

    The study was conducted to construct an anatomically inspired midfacial analysis facilitating safe, accurate, and dynamic nonsurgical rejuvenation. Emphasis is placed on determining injection target areas and adverse event zones. Twelve hemifacial fresh cadavers were dissected in a layered fashion. Dimensional measurements between the midfacial fat compartments, prezygomatic space, mimetic muscles, and neurovascular bundles were used to develop a topographic analysis for clinical injections. A longitudinal line from the base of the alar crease to the medial edge of the levator anguli oris muscle (1.9 cm), lateral edge of the levator anguli oris muscle (2.6 cm), and zygomaticus major muscle (4.6 cm) partitions the cheek into two aesthetic regions. A six-step facial analysis outlines three target zones and two adverse event zones and triangulates the point of maximum cheek projection. The lower adverse event zone yields an anatomical explanation to inadvertent jowling during anterior cheek injection. The upper adverse event zone localizes the palpebral branch of the infraorbital artery. The medial malar target area isolates quadrants for anterior cheek projection and tear trough effacement. The middle malar target area addresses lid-cheek blending and superficial compartment turgor. The lateral malar target area highlights lateral cheek projection and locates the prezygomatic space. This stepwise analysis illustrates target areas and adverse event zones to achieve midfacial support, contour, and profile in the repose position and simultaneous molding of a natural shape during animation. This reproducible method can be used both procedurally and in record-keeping for midface volumizing procedures.

  2. An operator calculus for surface and volume modeling

    Science.gov (United States)

    Gordon, W. J.

    1984-01-01

    The mathematical techniques which form the foundation for most of the surface and volume modeling techniques used in practice are briefly described. An outline of what may be termed an operator calculus for the approximation and interpolation of functions of more than one independent variable is presented. By considering the linear operators associated with bivariate and multivariate interpolation/approximation schemes, it is shown how they can be compounded by operator multiplication and Boolean addition to obtain a distributive lattice of approximation operators. It is then demonstrated via specific examples how this operator calculus leads to practical techniques for sculptured surface and volume modeling.

  3. The European Stroke Organisation Guidelines: a standard operating procedure

    DEFF Research Database (Denmark)

    Ntaios, George; Bornstein, Natan M; Caso, Valeria

    2015-01-01

    pace with this progress and driven by the strong determination of the European Stroke Organisation to further promote stroke management, education, and research, the European Stroke Organisation decided to delineate a detailed standard operating procedure for its guidelines. There are two important...... cornerstones in this standard operating procedure: The first is the implementation of the Grading of Recommendations Assessment, Development, and Evaluation methodology for the development of its Guideline Documents. The second one is the decision of the European Stroke Organisation to move from the classical...... and significant input from European Stroke Organisation members as well as methodologists and analysts, this document presents the official standard operating procedure for the development of the Guideline Documents of the European Stroke Organisation....

  4. The development of symptoms-oriented operating procedures

    International Nuclear Information System (INIS)

    Colquhoun, R.

    1983-04-01

    Until recently the formal treatment of control room procedures for nuclear power plant upset conditions has been event-oriented. The demise of Three Mile Island, Unit 2, caused the American industry to recognize the pitfalls inherent in relying totally on event-oriented procedures, and led to the initiation of a program for the development of a symptoms-oriented approach for handling upset conditions. The U.S. program has been independently paralleled by a Canadian program. This paper describes the development of the Canadian symptoms-oriented philosophy and identifies the relevance of a generic symptoms based emergency procedure to current operating practices

  5. Operational test procedure for Bldg 241-A-701 air compressor

    International Nuclear Information System (INIS)

    Desantis, G.N.

    1995-01-01

    This document is an Operability Test Procedure (OTP) which will verify and record that the 241-A-701 air compressor and associated equipment operates within their intended design parameters. The activities defined in this OTP will be performed to ensure the daily operation of the new compressed air system can be reliable and efficient. The Compressed Air System (CAS) for 241-A-701 supplies process and instrument air to the A, AX, AY, and AZ tank farms. The primary use of the CAS is for tank farms instrumentation, air operated valves, and air lift circulators

  6. Dosimetric impact of the variation of the prostate volume and shape between pretreatment planning and treatment procedure

    International Nuclear Information System (INIS)

    Beaulieu, Luc; Aubin, Sylviane; Taschereau, Richard; Pouliot, Jean; Vigneault, Eric

    2002-01-01

    Purpose: The goal of this study is to evaluate the dosimetric impact on a pretreatment planning of prostatic volume and shape variations occurring between the moment of the volume study (preplanning) and just before a transperineal permanent seed implant procedure. Such variations could be an obvious source of misplacement of the seeds relative to the prostate gland and organs at risk. Other sources of dosimetric uncertainties, such as misplacement due to the procedure itself or edema, are eliminated by looking at these variations before the implant procedure. Methods and Materials: For 35 clinical cases, prostate contours were taken at preplanning time as well as in the operating room (OR) minutes before the procedure. Comparison of shape and volume between the two sets was made. The impact on V100 was evaluated by placing the seeds in their planned positions in the new volume (clinical situation) and also by performing a new plan with the second set of contours to simulate an intraoperative approach. Results: The volume taken in the OR remained unchanged compared to the pretreatment planning volume in only 37% of the cases. While on average the dose coverage loss from pretreatment planning due to a combination of variations of volume and shape was small at 5.7%, a V100 degradation of up to 20.9% was observed in extreme cases. Even in cases in which no changes in volume were observed, changes in shape occurred and strongly affected implant dosimetry. Conclusions: Variations of volume and shape between pretreatment planning and the implant procedure can have a strong impact on the dosimetry if the planning and the implant procedure are not performed on the same day. This is an argument in favor of performing implant dosimetry in the OR

  7. ARM Operations and Engineering Procedure Mobile Facility Site Startup

    Energy Technology Data Exchange (ETDEWEB)

    Voyles, Jimmy W

    2015-05-01

    This procedure exists to define the key milestones, necessary steps, and process rules required to commission and operate an Atmospheric Radiation Measurement (ARM) Mobile Facility (AMF), with a specific focus toward on-time product delivery to the ARM Data Archive. The overall objective is to have the physical infrastructure, networking and communications, and instrument calibration, grooming, and alignment (CG&A) completed with data products available from the ARM Data Archive by the Operational Start Date milestone.

  8. Symptom-based emergency operating procedures development for Ignalina NPP

    International Nuclear Information System (INIS)

    Kruglov, Y.

    1999-01-01

    In this paper and lecture are presented: (1) Introduction; (2) EOP project work stages and documentation; (3) Selection and justification of accident management strategy; (4) Content of EOP package; (5) Development of EOP package; (6) EOP package verification; (7) EOP package validation; (8) EOP training; (9) EOP implementation; (10) Conditions of symptom-based emergency operating producers package application and its interconnection with event-based emergency operating procedures; (11) Rules of EOP application; EOP maintenance

  9. A finite volume procedure for fluid flow, heat transfer and solid-body stress analysis

    KAUST Repository

    Jagad, P. I.; Puranik, B. P.; Date, A. W.

    2018-01-01

    A unified cell-centered unstructured mesh finite volume procedure is presented for fluid flow, heat transfer and solid-body stress analysis. An in-house procedure (A. W. Date, Solution of Transport Equations on Unstructured Meshes with Cell

  10. 42 CFR 35.15 - Consent to operative procedures.

    Science.gov (United States)

    2010-10-01

    ... emergencies when the patient is physically or mentally incapable of consenting and the delay required to... operative procedure shall be undertaken unless the patient or, in the case of a minor or incompetent, his... or refusal of consent shall be made a part of the clinical record. ...

  11. Coping with Unanticipated Accidents using Emergency Operating Procedures

    International Nuclear Information System (INIS)

    Kim, Yochan; Jung, Wondea

    2013-01-01

    In, unsafe acts associated with a literal following of a procedure were reported. A report of the Fukushima accident also revealed that a tendency to adhere to procedures and prior practices can impede applying effective countermeasures. To overcome the conflicts between benefit and jeopardy of procedures during unanticipated accidents, we reviewed the literature on the perspectives of cognitive engineering and artificial intelligence. From the insights about human planning of the literatures, we also proposed an approach of how to train operators to effectively use EOPs during unanticipated accidents. There are three key processes required to effectively cope with emergency situations: how correctly the operators are aware of the occurring situations, how properly they develop corresponding plans for the situations, and how accurately they execute the plans. This paper presents a way to develop the plans using EOPs from some literature of human planning. Even if professional operators have implicitly shaped good structures of procedures already, it is expected that this approach will provide a more systematic and concrete training strategy. If the operators are trained with this strategy, a higher level of human reliability would be ensured in unanticipated accidents

  12. When high-volume PCI operators in high-volume hospitals move to lower volume hospitals-Do they still maintain high volume and quality of outcomes?

    Science.gov (United States)

    Lu, Tsung-Hsueh; Li, Sheng-Tun; Liang, Fu-Wen; Lee, Jo-Chi; Yin, Wei-Hsian

    2017-10-31

    The aim of this quasi-experimental study was to examine whether high-volume percutaneous coronary intervention (PCI) operators still maintain high volume and quality of outcomes when they moved to lower volume hospitals. Systematic reviews have indicated that high-volume PCI operators and hospitals have higher quality outcomes. However, little is known on whether high PCI volume and high quality outcomes are mainly due to operator characteristics (i.e., skill and experience) and is portable across organizations or whether it is due to hospital characteristics (i.e., equipment, team, and management system) and is less portable. We used Taiwan National Health Insurance claims data 2000-2012 to identify 98 high-volume PCI operators, 10 of whom moved from one hospital to another during the study period. We compared the PCI volume, risk-adjusted mortality ratio, and major adverse cardiovascular event (MACE) ratio before and after moving. Of the 10 high-volume operators who moved, 6 moved from high- to moderate- or low-volume hospitals, with median annual PCI volumes (interquartile range) of 130 (117-165) in prior hospitals and 54 (46-84) in subsequent hospitals (the hospital the operator moved to), and the remaining 4 moved from high to high-volume hospitals, with median annual PCI volumes (interquartile range) of 151 (133-162) in prior hospitals and 193 (178-239) in subsequent hospitals. No significant differences were observed in the risk-adjusted mortality ratios and MACE ratios between high-volume operators and matched controls before and after moving. High-volume operators cannot maintain high volume when they moved from high to moderate or low-volume hospitals; however, the quality of care is maintained. High PCI volume and high-quality outcomes are less portable and more hospital bound. © 2017 Wiley Periodicals, Inc.

  13. Emergency operating procedure upgrade program and audit results

    International Nuclear Information System (INIS)

    Graham, P.D.

    1989-01-01

    This paper describes the method and results of upgrading the River Bend station boiling water reactor 6 emergency operating procedures (EOPs). The upgrade program replaced difficult-to-implement narrative procedures with well-developed flowcharts. The flowcharts eliminate a number of human factors problems, are user friendly, provide for easy implementation, and provide technical information in a clear, concise format. Positive results were seen immediately. The operating crews found the flowcharts to be clear, understandable, and usable. Simulator training and EOP implementation became something that the operators no longer dreaded, and their confidence in their ability to control emergency situations was greatly improved. The paper provides a summary of the EOP upgrade program

  14. Surgical site infections in paediatric otolaryngology operative procedures.

    Science.gov (United States)

    Ifeacho, S N; Bajaj, Y; Jephson, C G; Albert, D M

    2012-07-01

    An assessment of the rate of surgical site infections associated with elective paediatric otolaryngology surgical procedures. Prospective data was collected for a 3-week period for all children undergoing surgery where either mucosa or skin was breached. The parents of the children were requested to complete a questionnaire at 30 days after the operation. Data was collected on 80 consecutive cases. The majority of cases were admitted on the day of the procedure. The procedures included adenotonsillectomy (24), grommets (12), cochlear implantation (6), bone-anchored hearing aid (2), submandibular gland excision (1), branchial sinus excision (1), cystic hygroma excision (3), nasal glioma excision (1), microlaryngobronchoscopy (13), tracheostomy (3) and other procedures (14). Nearly half the cases had more than one operation done at the same time. 26/80 (32.5%) patients had a temporary or permanent implant inserted at the time of operation (grommet, bone-anchored hearing aid, cochlear implant). 25/80 (31%) operative fields were classed as clean and 55/80 (68.7%) as clean contaminated operations. The duration of the operation varied from 6 min to 142 min. Hospital antibiotic protocol was adhered to in 69/80 (86.3%) cases but not in 11/80 cases. In our series, 3/80 (3.7%) patients had an infection in the postoperative period. Surgical site infections do occur at an appreciable rate in paediatric otolaryngology. With the potential for serious consequences, reduction in the risk of surgical site infections is important. Copyright © 2012 Elsevier Ireland Ltd. All rights reserved.

  15. Data collection system. Volume 1, Overview and operators manual; Volume 2, Maintenance manual; Appendices

    Energy Technology Data Exchange (ETDEWEB)

    Caudell, R.B.; Bauder, M.E.; Boyer, W.B.; French, R.E.; Isidoro, R.J.; Kaestner, P.C.; Perkins, W.G.

    1993-09-01

    Sandia National Laboratories (SNL) Instrumentation Development Department was tasked by the Defense Nuclear Agency (DNA) to record data on Tektronix RTD720 Digitizers on the HUNTERS TROPHY field test conducted at the Nevada Test Site (NTS) on September 18, 1992. This report contains a overview and description of the computer hardware and software that was used to acquire, reduce, and display the data. The document is divided into two volumes: an overview and operators manual (Volume 1) and a maintenance manual (Volume 2).

  16. Merrill's Atlas of radiographic positions and radiologic procedures. Volumes 1-3. Sixth edition

    International Nuclear Information System (INIS)

    Ballinger, P.W.

    1985-01-01

    Merrill's Atlas describes and explains the routine and specialized radiologic procedures for all body systems. This edition thoroughly reorganized, updated and expanded. Volumes one and two describe all routine and flouroscopic procedures; and volume three describes more specialized areas in the profession

  17. Operator behaviors observed in following emergency operating procedure under a simulated emergency

    International Nuclear Information System (INIS)

    Choi, Sun Yeong; Park, Jin Kyun

    2012-01-01

    A symptom-based procedure with a critical safety function monitoring system has been established to reduce the operator's diagnosis and cognitive burden since the Three-Mile Island (TMI) accident. However, it has been reported that a symptom-based procedure also requires an operator's cognitive efforts to cope with off-normal events. This can be caused by mismatches between a static model, an emergency operating procedure (EOP), and a dynamic process, the nature of an ongoing situation. The purpose of this study is to share the evidence of mismatches that may result in an excessive cognitive burden in conducting EOPs. For this purpose, we analyzed simulated emergency operation records and observed some operator behaviors during the EOP operation: continuous steps, improper description, parameter check at a fixed time, decision by information previously obtained, execution complexity, operation by the operator's knowledge, notes and cautions, and a foldout page. Since observations in this study are comparable to the results of an existing study, it is expected that the operational behaviors observed in this study are generic features of operators who have to cope with a dynamic situation using a static procedure.

  18. Guide to the selection, training, and licensing or certification of reprocessing plant operators. Volume I

    International Nuclear Information System (INIS)

    1976-06-01

    The Code of Federal Regulations, Title 10, Part 55, establishes procedures and criteria for the licensing of operators, including senior operators, in ''Production and Utilization Facilities'', which includes plants for reprocessing irradiated fuel. A training guide is presented which will facilitate the licensing of operators for nuclear reprocessing plants by offering generalized descriptions of the basic principles (theory) and the unit operations (mechanics) employed in reprocessing spent fuels. In the present volume, details about the portions of a training program that are of major interest to management are presented

  19. Guide to the selection, training, and licensing or certification of reprocessing plant operators. Volume I

    Energy Technology Data Exchange (ETDEWEB)

    None

    1976-06-01

    The Code of Federal Regulations, Title 10, Part 55, establishes procedures and criteria for the licensing of operators, including senior operators, in ''Production and Utilization Facilities'', which includes plants for reprocessing irradiated fuel. A training guide is presented which will facilitate the licensing of operators for nuclear reprocessing plants by offering generalized descriptions of the basic principles (theory) and the unit operations (mechanics) employed in reprocessing spent fuels. In the present volume, details about the portions of a training program that are of major interest to management are presented. (JSR)

  20. Operability test procedure [Tank] 241-SY-101 equipment removal system

    International Nuclear Information System (INIS)

    Mast, J.C.

    1994-01-01

    The 241-SY-101 equipment removal system (ERS) consists of components, equipment, instrumentation and procedures that will provide the means to disconnect, retrieve, contain, load and transport the Mitigation Pump Assembly (MPA) from waste Tank 241-SY-101 to the Central Waste Complex (CWC). The Operability Test Procedure (OTP) will test the interfaces between ERS components and will rehearse the procedure for MPA removal and transportation to the extent they can be mocked-up at the CTF (Cold Test Facility). At the conclusion of the OTP, the ERS components and equipment will be removed from the CTF, entered into the Component Based Recall System (CBRS), and stored until needed for actual MPA removal and transportation

  1. The plant operating procedure information modeling system for creation and maintenance of procedures

    International Nuclear Information System (INIS)

    Fanto, S.V.; Petras, D.S.; Reiner, R.T.; Frost, D.R.; Orendi, R.G.

    1990-01-01

    This paper reports that as a result of the accident at Three Mile Island, regulatory requirements were issued to upgrade Emergency Operating Procedures for nuclear power plants. The use of human-factored, function-oriented, EOPs were mandated to improve human reliability and to mitigate the consequences of a broad range of initiating events, subsequent failures and operator errors, without having to first diagnose the specific events. The Westinghouse Owners Group responded by developing the Emergency Response Guidelines in a human-factored, two-column format to aid in the transfer of the improved technical information to the operator during transients and accidents. The ERGs are a network of 43 interrelated guidelines which specify operator actions to be taken during plant emergencies to restore the plant to a safe and stable condition. Each utility then translates these guidelines into plant specific EOPs. The creation and maintenance of this large web of interconnecting ERGs/EOPs is an extremely complex task. This paper reports that in order to aid procedure documentation specialists with this time-consuming and tedious task, the Plant Operating Procedure Information Modeling system was developed to provide a controlled and consistent means to build and maintain the ERGs/EOPs and their supporting documentation

  2. Procedure for following external nuclear power plant operating experience

    International Nuclear Information System (INIS)

    Kostadinov, V.

    2003-01-01

    Slovenian Nuclear Safety Administration (SNSA) has developed computer database and the procedure for following-up and investigating external nuclear operating experience and administrative requirements. The SNSA's primary goal is to investigate safety significant events in due time, to analyze them from the regulatory point of view and to ensure that meaningful lessons be learned and used for improvement of the safe operation of Slovenian Nuclear Power Plant Krsko. Moreover, we intend to make uniform format and method for reporting broader spectrum of events analyzed including low level event reporting. (author)

  3. The design of operating procedures manuals for nuclear power plants

    International Nuclear Information System (INIS)

    Bohr, E.; Preuss, W.; Reinartz, G.; Thau, G.

    1977-03-01

    This report describes the findings of a research on the desirable design of operating procedures manuals for nuclear power plants. The work was supported by a grant of the Federal Department of the Interior. Information was acquired from different sources. Interviews and discussions on manual design were carried out with manual users in nuclear power plants. Moreover, tasks carried out using procedures were either observed or, alternatively, the manner of using procedures was elicited by interviews. In addition, manual writers, managers from manufacturers and utilities, nuclear experts, and individuals involved in manual specification activities were interviewed. A major source of information has been the pertinent scientific and technical findings scattered in the literature on topics such as instructional technology, engineering psychology, psycholinguistics, and typography. A comprehensive bibliography is included. General rules are established on designing instructional material for use on the job, aiming at increasing their legability, comprehensibility, and suitability to guide human performance. The application of these rules to the design of individual operating procedures is demonstrated. Recommendations are given on the design, layout, development and implementation of manuals. (orig.) [de

  4. Surveillance procedure for the rotary drilling operations of a well

    Energy Technology Data Exchange (ETDEWEB)

    Peltier, B; Deshais, R

    1988-06-17

    A surveillance procedure for the rotary drilling operations of a well is proposed. When the drilling pipe is drawn out of the well, or put into the well, pipe elements are taken away or added. At each moment the height of the trepan in the well is measured, together with the traction force of the lifting engine. The device permits to avoid the important damage that can be caused by an error on the drilling pipe's length.

  5. Surveillance procedure for the rotary drilling operations of a well

    Energy Technology Data Exchange (ETDEWEB)

    Peltier, B.; Deshais, R.

    1988-06-17

    A surveillance procedure for the rotary drilling operations of a well is proposed. When the drilling pipe is drawn out of the well, or put into the well, pipe elements are taken away or added. At each moment the height of the trepan in the well is measured, together with the traction force of the lifting engine. The device permits to avoid the important damage that can be caused by an error on the drilling pipe's length.

  6. Flowchart-format emergency operating procedures-strengths and weaknesses

    International Nuclear Information System (INIS)

    Barnes, V.E.; Bongarra, J.P. Jr.

    1989-01-01

    An increasing number of nuclear power plant licensees are converting their text-format emergency operating procedures (EOPs) to flowcharts. Findings of a recent study of the flowchart-format EOPs indicate that the flowchart format appears to solve several significant usability problems associated with text-format EOPs, but also introduces other types of usability concerns. This paper discusses some of the strengths and weaknesses of the flowchart format for presenting EOPs

  7. An operational procedure for rapid flood risk assessment in Europe

    Science.gov (United States)

    Dottori, Francesco; Kalas, Milan; Salamon, Peter; Bianchi, Alessandra; Alfieri, Lorenzo; Feyen, Luc

    2017-07-01

    The development of methods for rapid flood mapping and risk assessment is a key step to increase the usefulness of flood early warning systems and is crucial for effective emergency response and flood impact mitigation. Currently, flood early warning systems rarely include real-time components to assess potential impacts generated by forecasted flood events. To overcome this limitation, this study describes the benchmarking of an operational procedure for rapid flood risk assessment based on predictions issued by the European Flood Awareness System (EFAS). Daily streamflow forecasts produced for major European river networks are translated into event-based flood hazard maps using a large map catalogue derived from high-resolution hydrodynamic simulations. Flood hazard maps are then combined with exposure and vulnerability information, and the impacts of the forecasted flood events are evaluated in terms of flood-prone areas, economic damage and affected population, infrastructures and cities.An extensive testing of the operational procedure has been carried out by analysing the catastrophic floods of May 2014 in Bosnia-Herzegovina, Croatia and Serbia. The reliability of the flood mapping methodology is tested against satellite-based and report-based flood extent data, while modelled estimates of economic damage and affected population are compared against ground-based estimations. Finally, we evaluate the skill of risk estimates derived from EFAS flood forecasts with different lead times and combinations of probabilistic forecasts. Results highlight the potential of the real-time operational procedure in helping emergency response and management.

  8. Methods for implementing revisions to emergency operating procedures. Final report

    International Nuclear Information System (INIS)

    Myers, L.B.; Bell, A.J.

    1984-05-01

    In response to the Three Mile Island (TMI) accident, the US Nuclear Regulatory Commission (NRC) has published the TMI Action Plan. The TMI Action Plan Item I.C.1 called for the upgrading of Emergency Operating Procedures (EOPs) at nuclear power plants. The program developed from this Action Plan item has resulted in utility efforts to: (1) revise EOPs; (2) train personnel in the use of the EOPs; and (3) implement the revised EOPs. The NRC supported the study presented in this report to identify factors which influence the effectiveness of training and implementation of revised EOPs. The NRC's major concern was the possible effects of negative transfer of training. The report includes a summary of existing methods for implementing revisions to procedures based on interviews of plant personnel, a review of the training literature applicable to the effect of previously learned procedures on the learning of and performance with revised procedures (i.e., negative transfer) and recommendations of methods and schedules for implementing revised EOPs. While the study found that the concern over negative transfer of training was not as great as anticipated, several recommendations were made. These include: (1) overtraining of operators to reduce the effect of observed negative transfer; and (2) implementation of the revised EOPs as soon as possible after training to minimize the time operators must rely upon the old EOPs after having been trained on the revised EOPs. The results of the study should be useful both to the utilities and the NRC in the development and review of EOP implementation programs

  9. Loss on Ignition Furnace Acceptance and Operability Test Procedure

    International Nuclear Information System (INIS)

    JOHNSTON, D.C.

    2000-01-01

    The purpose of this Acceptance Test Procedure and Operability Test Procedure (ATP/OTP)is to verify the operability of newly installed Loss on Ignition (LOI) equipment, including a model 1608FL CMTM Furnace, a dessicator, and balance. The operability of the furnace will be verified. The arrangement of the equipment placed in Glovebox 157-3/4 to perform LOI testing on samples supplied from the Thermal Stabilization line will be verified. In addition to verifying proper operation of the furnace, this ATP/OTP will also verify the air flow through the filters, verify a damper setting to establish and maintain the required differential pressure between the glovebox and the room pressure, and test the integrity of the newly installed HEPA filter. In order to provide objective evidence of proper performance of the furnace, the furnace must heat 15 crucibles, mounted on a crucible rack, to 1000 C, according to a program entered into the furnace controller located outside the glovebox. The glovebox differential pressure will be set to provide the 0.5 to 2.0 inches of water (gauge) negative pressure inside the glovebox with an expected airflow of 100 to 125 cubic feet per minute (cfm) through the inlet filter. The glovebox inlet G1 filter will be flow tested to ensure the integrity of the filter connections and the efficiency of the filter medium. The newly installed windows and glovebox extension, as well as all disturbed joints, will be sonically tested via ultra probe to verify no leaks are present. The procedure for DOS testing of the filter is found in Appendix A

  10. Loss on Ignition Furnace Acceptance and Operability Test Procedure

    Energy Technology Data Exchange (ETDEWEB)

    JOHNSON, D.C.

    2000-06-01

    The purpose of this Acceptance Test Procedure and Operability Test Procedure (ATP/OTP)is to verify the operability of newly installed LOI equipment, including a model 1608FL CM{trademark} Furnace, a dessicator, and balance. The operability of the furnace will be verified. The arrangement of the equipment placed in Glovebox 157-3/4 to perform Loss on Ignition (LOI) testing on samples supplied from the Thermal Stabilization line will be verified. In addition to verifying proper operation of the furnace, this ATP/OTP will also verify the air flow through the filters, verify a damper setting to establish and maintain the required differential pressure between the glovebox and the room pressure, and test the integrity of the newly installed HEPA filter. In order to provide objective evidence of proper performance of the furnace, the furnace must heat 15 crucibles, mounted on a crucible rack, to 1000 C, according to a program entered into the furnace controller located outside the glovebox. The glovebox differential pressure will be set to provide the 0.5 to 2.0 inches of water (gauge) negative pressure inside the glovebox with an airflow of 100 to 125 cubic feet per minute (cfm) through the inlet filter. The glovebox inlet Glfilter will he flow tested to ensure the integrity of the filter connections and the efficiency of the filter medium. The newly installed windows and glovebox extension, as well as all disturbed joints, will be sonically tested via ultra probe to verify no leaks are present. The procedure for DOS testing of the filter is found in Appendix A.

  11. Lessons learned from operating experience, maintenance procedures and training measures

    International Nuclear Information System (INIS)

    Guttner, K.; Gronau, D.

    2003-01-01

    Training programmes for nuclear facility personnel as a result of the developing phase of SAT have to be approved in the subsequent implementation and evaluation phases with the consequence of several feedback activities in the whole training process. The effectiveness of this procedure has to be evaluated especially with respect to an improvement of safety culture, shorter outage times or better plant performance, resulting in a smaller number of incidents due to human failures. The first two arguments are directly connected with all types of maintenance work in a nuclear power plant and the related preparatory training measures. The reduction of incidents due to human failures is the result of different influences, i.e. training of the operational as well as of the maintenance personnel together with changes of the operating procedures or system design. Though an evaluation of the training process should always be based on a clear definition of criteria by which the fulfilment of the learning objectives can be measured directly, the real effectiveness of training is proven by the behaviour and attitude of the personnel which can only be taken from indirect indicators. This is discussed in more detail for some examples being partly related to the above mentioned arguments. An excellent plant performance, representing a general objective of all activities, can be analysed by the changed number and reasons of incidents in a plant during its operation time. Two further examples are taken from the reactor service field where there is a tendency to reduce the individual dose rates by changed devices and/or procedures as an output from training experience with mockups. Finally the rationalisation of refresher training for operational personnel by the use of interactive teaching programs (Computer Based Training - CBT) is presented which integrate learning objectives together with a test module. (author)

  12. Assessment of different concentrations of ketofol in procedural operations

    International Nuclear Information System (INIS)

    Daabiss, Mohamed; Elsherbiny, Medhat; Al Otaibi, Rashed

    2009-01-01

    Propofol is an intravenous anesthetic that is often used as an adjuvant during monitored anesthesia care, the addition of ketamine to propofol may counteract the cardiorespiratory depression seen with propofol used alone. Ketofol (ketamine/propofol combination) was used for procedural sedation and analgesia. However, evaluation of the effectiveness of different concentrations of Ketofol in procedural operation regarding changes in haemodynamics, emergence phenomena, recovery time, the doses, and adverse effects was not yet studied, so this randomized, double blinded study was designed to compare the quality of analgesia and side effects of intravenous different concentrations of ketofol. One hundred children of both sex undergoing procedural operation, e.g. esophgoscopy, rectoscopy, bone marrow aspiration and liver biopsy participated in this. Patients received an infusion of a solution containing either combination of propofol: ketamine (1:1) (Group I) or propofol: ketamine (4:1) (Group II). Subsequent infusion rates to a predetermined sedation level using Ramsay Sedation Scale. Heart rate, noninvasive arterial blood pressure (NIBP), oxygen saturation (SpO2), end tidal carbon dioxide (Etco 2 ) and incidence of any side effects were recorded. There were no significant hemodynamic changes in both groups after induction. However, there was an increase in postoperative nausea, psychomimetic side effects, and delay in discharge times in group I compared to group II. The adjunctive use of smaller dose of ketamine in ketofol combination minimizes the psychomimetic side effects and shortens the time of hospital discharge. (author)

  13. Environmental Sciences Division Toxicology Laboratory standard operating procedures

    International Nuclear Information System (INIS)

    Kszos, L.A.; Stewart, A.J.; Wicker, L.F.; Logsdon, G.M.

    1989-09-01

    This document was developed to provide the personnel working in the Environmental Sciences Division's Toxicology Laboratory with documented methods for conducting toxicity tests. The document consists of two parts. The first part includes the standard operating procedures (SOPs) that are used by the laboratory in conducting toxicity tests. The second part includes reference procedures from the US Environmental Protection Agency document entitled Short-Term Methods for Estimating the Chronic Toxicity of Effluents and Receiving Waters to Freshwater Organisms, upon which the Toxicology Laboratory's SOPs are based. Five of the SOPs include procedures for preparing Ceriodaphnia survival and reproduction test. These SOPs include procedures for preparing Ceriodaphnia food (SOP-3), maintaining Ceriodaphnia cultures (SOP-4), conducting the toxicity test (SOP-13), analyzing the test data (SOP-13), and conducting a Ceriodaphnia reference test (SOP-15). Five additional SOPs relate specifically to the fathead minnow (Pimephales promelas) larval survival and growth test: methods for preparing fathead minnow larvae food (SOP-5), maintaining fathead minnow cultures (SOP-6), conducting the toxicity test (SOP-9), analyzing the test data (SOP-12), and conducting a fathead minnow reference test (DOP-14). The six remaining SOPs describe methods that are used with either or both tests: preparation of control/dilution water (SOP-1), washing of glassware (SOP-2), collection and handling of samples (SOP-7), preparation of samples (SOP-8), performance of chemical analyses (SOP-11), and data logging and care of technical notebooks (SOP-16)

  14. Eigenvalues of the volume operator in loop quantum gravity

    International Nuclear Information System (INIS)

    Meissner, Krzysztof A

    2006-01-01

    We present a simple method to calculate certain sums of the eigenvalues of the volume operator in loop quantum gravity. We derive the asymptotic distribution of the eigenvalues in the classical limit of very large spins, which turns out to be of a very simple form. The results can be useful for example in the statistical approach to quantum gravity

  15. Operating the plant, quality assurance, and the job of the operating staff, Volume Twelve

    International Nuclear Information System (INIS)

    Anon.

    1986-01-01

    Subject matter includes operating the plant (the role of the operator, the control room, plant technical specifications, plant operating procedures, initial startup program, BWR/PWR plant startup, BWR/PWR steady state power operation, BWR/PWR transient operation, emergency operation), quality assurance (what is quality, what is quality control, quality assurance includes quality control, government regulation and quality assurance, administrative controls for nuclear power plants, the necessity of reviews and audits, practical quality assurance), and the job of the operating staff (the plant operating staff, plant safety, first aid and resuscitation, general plant hazards, personnel protective equipment, handling chemicals, handling compressed gas, equipment repair and maintenance, communicating with others

  16. The European Stroke Organisation Guidelines: a standard operating procedure.

    Science.gov (United States)

    Ntaios, George; Bornstein, Natan M; Caso, Valeria; Christensen, Hanne; De Keyser, Jacques; Diener, Hans-Christoph; Diez-Tejedor, Exuperio; Ferro, Jose M; Ford, Gary A; Grau, Armin; Keller, Emanuella; Leys, Didier; Russell, David; Toni, Danilo; Turc, Guillaume; Van der Worp, Bart; Wahlgren, Nils; Steiner, Thorsten

    2015-10-01

    In 2008, the recently founded European Stroke Organisation published its guidelines for the management of ischemic stroke and transient ischemic attack. This highly cited document was translated in several languages and was updated in 2009. Since then, the European Stroke Organisation has published guidelines for the management of intracranial aneurysms and subarachnoidal hemorrhage, for the establishment of stroke units and stroke centers, and recently for the management of intracerebral hemorrhage. In recent years, the methodology for the development of guidelines has evolved significantly. To keep pace with this progress and driven by the strong determination of the European Stroke Organisation to further promote stroke management, education, and research, the European Stroke Organisation decided to delineate a detailed standard operating procedure for its guidelines. There are two important cornerstones in this standard operating procedure: The first is the implementation of the Grading of Recommendations Assessment, Development, and Evaluation methodology for the development of its Guideline Documents. The second one is the decision of the European Stroke Organisation to move from the classical model of a single Guideline Document about a major topic (e.g. management of ischemic stroke) to focused modules (i.e. subdivisions of a major topic). This will enable the European Stroke Organisation to react faster when new developments in a specific stroke field occur and update its recommendations on the related module rather swiftly; with the previous approach of a single large Guideline Document, its entire revision had to be completed before an updated publication, delaying the production of up-to-date guidelines. After discussion within the European Stroke Organisation Guidelines Committee and significant input from European Stroke Organisation members as well as methodologists and analysts, this document presents the official standard operating procedure for

  17. Step Complexity Measure for Emergency Operating Procedures - Determining Weighting Factors

    International Nuclear Information System (INIS)

    Park, Jinkyun; Jung, Wondea; Kim, Jaewhan; Ha, Jaejoo

    2003-01-01

    In complex systems, such as nuclear power plants (NPPs) or airplane control systems, human error has been regarded as the primary cause of many events. Therefore, to ensure system safety, extensive effort has been made to identify the significant factors that can cause human error. According to related studies, written manuals or operating procedures are revealed as one of the important factors, and the understandability is pointed out as one of the major reasons for procedure-related human errors.Many qualitative checklists have been suggested to evaluate emergency operating procedures (EOPs) of NPPs so as to minimize procedure-related human errors. However, since qualitative evaluations using checklists have some drawbacks, a quantitative measure that can quantify the complexity of EOPs is indispensable.From this necessity, Park et al. suggested the step complexity (SC) measure to quantify the complexity of procedural steps included in EOPs. To verify the appropriateness of the SC measure, averaged step performance time data obtained from emergency training records of the loss-of-coolant accident (LOCA) and the excess steam demand event were compared with estimated SC scores. However, although averaged step performance time data and estimated SC scores show meaningful correlation, some important issues such as determining proper weighting factors have to be clarified to ensure the appropriateness of the SC measure. These were not properly dealt with due to a lack of backup data.In this paper, to resolve one of the important issues, emergency training records are additionally collected and analyzed in order to determine proper weighting factors. The total number of collected records is 66, and the training scenarios cover five emergency conditions including the LOCA, the steam generator tube rupture, the loss of all feedwater, the loss of off-site power, and the station blackout. From these records, average step performance time data are retrieved, and new

  18. Field Operations and Enforcement Manual for Air Pollution Control. Volume II: Control Technology and General Source Inspection.

    Science.gov (United States)

    Weisburd, Melvin I.

    The Field Operations and Enforcement Manual for Air Pollution Control, Volume II, explains in detail the following: technology of source control, modification of operations, particulate control equipment, sulfur dioxide removal systems for power plants, and control equipment for gases and vapors; inspection procedures for general sources, fuel…

  19. Nuclear fuel technology - Tank calibration and volume determination for nuclear materials accountancy - Part 1: Procedural overview

    International Nuclear Information System (INIS)

    2007-01-01

    Accurate determinations of volume are a fundamental component of any measurement-based system of control and accountability in a facility that processes or stores nuclear materials in liquid form. Volume determinations are typically made with the aid of a calibration or volume measurement equation that relates the response of the tank's measurement system to some independent measure of tank volume. The ultimate purpose of the calibration exercise is to estimate the tank's volume measurement equation (the inverse of the calibration equation), which relates tank volume to measurement system response. The steps carried out to acquire data for estimating the tank's calibration or volume measurement equation are collectively described as the process of tank calibration. This part of ISO 18213 describes procedures for tank calibration and volume determination for nuclear process tanks equipped with pressure-measurement systems for determining liquid content. Specifically, overall guidance is provided for planning a calibration exercise undertaken to obtain the data required for the measurement equation to estimate a tank's volume. The key steps in the procedure are also presented for subsequently using the estimated volume-measurement equation to determine tank liquid volumes. The procedures presented apply specifically to tanks equipped with bubbler probe systems for measuring liquid content. Moreover, these procedures produce reliable results only for clear (i.e. without suspended solids), homogeneous liquids that are at both thermal and static equilibrium. The paper elaborates on scope, physical principles involved, the calibration model, equipment required, a typical tank calibration procedure, calibration planning and pre-calibration activities, and volume determination. A bibliography is provided

  20. The step complexity measure for emergency operating procedures: measure verification

    International Nuclear Information System (INIS)

    Park, Jinkyun; Jung, Wondea; Ha, Jaejoo; Park, Changkue

    2002-01-01

    In complex systems, such as nuclear power plants (NPPs) or airplane control systems, human errors play a major role in many accidents. Therefore, to prevent an occurrence of accidents or to ensure system safety, extensive effort has been made to identify significant factors that can cause human errors. According to related studies, written manuals or operating procedures are revealed as one of the most important factors, and the understandability is pointed out as one of the major reasons for procedure-related human errors. Many qualitative checklists are suggested to evaluate emergency operating procedures (EOPs) of NPPs. However, since qualitative evaluations using checklists have some drawbacks, a quantitative measure that can quantify the complexity of EOPs is very necessary to compensate for them. In order to quantify the complexity of steps included in EOPs, Park et al. suggested the step complexity (SC) measure. In addition, to ascertain the appropriateness of the SC measure, averaged step performance time data obtained from emergency training records for the loss of coolant accident and the excess steam dump event were compared with estimated SC scores. Although averaged step performance time data show good correlation with estimated SC scores, conclusions for some important issues that have to be clarified to ensure the appropriateness of the SC measure were not properly drawn because of lack of backup data. In this paper, to clarify remaining issues, additional activities to verify the appropriateness of the SC measure are performed using averaged step performance time data obtained from emergency training records. The total number of available records is 36, and training scenarios are the steam generator tube rupture and the loss of all feedwater. The number of scenarios is 18 each. From these emergency training records, averaged step performance time data for 30 steps are retrieved. As the results, the SC measure shows statistically meaningful

  1. Operability test procedure for PFP wastewater sampling facility

    International Nuclear Information System (INIS)

    Hirzel, D.R.

    1995-01-01

    Document provides instructions for performing the Operability Test of the 225-WC Wastewater Sampling Station which monitors the discharge to the Treated Effluent Disposal Facility from the Plutonium Finishing Plant. This Operability Test Procedure (OTP) has been prepared to verify correct configuration and performance of the PFP Wastewater sampling system installed in Building 225-WC located outside the perimeter fence southeast of the Plutonium Finishing Plant (PFP). The objective of this test is to ensure the equipment in the sampling facility operates in a safe and reliable manner. The sampler consists of two Manning Model S-5000 units which are rate controlled by the Milltronics Ultrasonic flowmeter at manhole No.C4 and from a pH measuring system with the sensor in the stream adjacent to the sample point. The intent of the dual sampling system is to utilize one unit to sample continuously at a rate proportional to the wastewater flow rate so that the aggregate tests are related to the overall flow and thereby eliminate isolated analyses. The second unit will only operate during a high or low pH excursion of the stream (hence the need for a pH control). The major items in this OTP include testing of the Manning Sampler System and associated equipment including the pH measuring and control system, the conductivity monitor, and the flow meter

  2. Operational procedure standard for occurrences involving radioactive materials

    International Nuclear Information System (INIS)

    Piekarz, Leonardo; Rezende, Talita C.; Pinheiro, Christiano J.G.

    2017-01-01

    This study has as objective to analyze more deeply the actions of response to emergencies involving radioactive materials, in the intent to establish a pattern to the actions performed by the military fire fighters of the Military Fire Brigade of Minas Gerais. To met these goals, it has been attempted to analyze the procedures utilized and recommended, nowadays, for the military fire fighters of CBMMG, and through directed studies, to suggest new actions possible to be executed in the local of the emergency in a way that will not expose the garrison to doses of ionizing radiation that may prejudice them. It is a study of bibliographic, exploratory, and also descriptive nature, realized through a qualitative approach. The techniques used for the research were the analysis of institutional documents, norms and other literature produced by renamed entities in the radiologic and biosafety areas. It was then concluded that CBMMG, through simple actions of response, can provide higher quality and safety in the operations involving radiologic accidents, standing out that the implemented actions nowadays are very beneath the capacity of the corporation, due to the lack of knowledge of the matter by the fire fighters. It was proposed, then, that new actions be implemented and instituted as operational procedures to be used on those emergencies, with the objective of provide a higher safety and professionalism in the attendance to emergencies involving radioactive materials. (author)

  3. Operational procedure standard for occurrences involving radioactive materials

    Energy Technology Data Exchange (ETDEWEB)

    Piekarz, Leonardo, E-mail: leonardopbm@yahoo.com.br [Academia de Bombeiros Militar de Minas Gerais, Belo Horizonte, MG (Brazil); Rezende, Talita C.; Pinheiro, Christiano J.G., E-mail: talitacolombi@yahoo.com, E-mail: christrieste@yahoo.it [Universidade Federal do Espirito Santo (CCA/UFES), Alegre, ES (Brazil). Programa de Pós-Graduação em Engenharia Química

    2017-07-01

    This study has as objective to analyze more deeply the actions of response to emergencies involving radioactive materials, in the intent to establish a pattern to the actions performed by the military fire fighters of the Military Fire Brigade of Minas Gerais. To met these goals, it has been attempted to analyze the procedures utilized and recommended, nowadays, for the military fire fighters of CBMMG, and through directed studies, to suggest new actions possible to be executed in the local of the emergency in a way that will not expose the garrison to doses of ionizing radiation that may prejudice them. It is a study of bibliographic, exploratory, and also descriptive nature, realized through a qualitative approach. The techniques used for the research were the analysis of institutional documents, norms and other literature produced by renamed entities in the radiologic and biosafety areas. It was then concluded that CBMMG, through simple actions of response, can provide higher quality and safety in the operations involving radiologic accidents, standing out that the implemented actions nowadays are very beneath the capacity of the corporation, due to the lack of knowledge of the matter by the fire fighters. It was proposed, then, that new actions be implemented and instituted as operational procedures to be used on those emergencies, with the objective of provide a higher safety and professionalism in the attendance to emergencies involving radioactive materials. (author)

  4. Provider volume and outcomes for abdominal aortic aneurysm repair, carotid endarterectomy, and lower extremity revascularization procedures.

    LENUS (Irish Health Repository)

    Killeen, Shane D

    2012-02-03

    BACKGROUND: Intuitively, vascular procedures performed by high-volume vascular subspecialists working at high-volume institutions should be associated with improved patient outcome. Although a large number of studies assess the relationship between volume and outcome, a single contemporary compilation of such studies is lacking. METHODS: A review of the English language literature was performed incorporating searches of the Medline, EMBASE, and Cochrane collaboration databases for abdominal aortic aneurysm repair (elective and emergent), carotid endarterectomy, and arterial lower limb procedures for any volume outcome relationship. Studies were included if they involved a patient cohort from 1980 onwards, were community or population based, and assessed health outcomes (mortality and morbidity) as a dependent variable and volume as an independent variable. RESULTS: We identified 74 relevant studies, and 54 were included. All showed either an inverse relationship of variable magnitude between provider volume and mortality, or no volume-outcome effect. The reduction in the risk-adjusted mortality rate (RAMR) for high-volume providers was 3% to 11% for elective abdominal aortic aneurysm (AAA) repair, 2.5 to 5% for emergent AAA repair, 0.7% to 4.7% carotid endarterectomy, and 0.3% to 0.9% for lower limb arterial bypass procedures. Subspeciality training also conferred a considerable morbidity and mortality benefit for emergent AAA repair, carotid endarterectomy, and lower limb arterial procedures. CONCLUSION: High-volume providers have significantly better outcomes for vascular procedures both in the elective and emergent setting. Subspeciality training also has a considerable impact. These data provide further evidence for the specialization of vascular services, whereby vascular procedures should generally be preformed by high-volume, speciality trained providers.

  5. Recreation of architectural structures using procedural modeling based on volumes

    Directory of Open Access Journals (Sweden)

    Santiago Barroso Juan

    2013-11-01

    Full Text Available While the procedural modeling of buildings and other architectural structures has evolved very significantly in recent years, there is noticeable absence of high-level tools that allow a designer, an artist or an historian, creating important buildings or architectonic structures in a particular city. In this paper we present a tool for creating buildings in a simple and clear, following rules that use the language and methodology of creating their own buildings, and hiding the user the algorithmic details of the creation of the model.

  6. Analytical Chemistry Laboratory (ACL) procedure compendium. Volume 1, Administrative

    Energy Technology Data Exchange (ETDEWEB)

    1992-06-01

    Covered are: analytical laboratory operations (ALO) sample receipt and control, ALO data report/package preparation review and control, single shell tank (PST) project sample tracking system, sample receiving, analytical balances, duties and responsibilities of sample custodian, sample refrigerator temperature monitoring, security, assignment of staff responsibilities, sample storage, data reporting, and general requirements for glassware.

  7. OPERATIONAL DISTRIBUTION OF THE TRAIN TRAFFIC VOLUME ON THE SECTIONS OF RAILWAY OPERATING DOMAIN

    Directory of Open Access Journals (Sweden)

    G. Ya. Моzolevich

    2013-10-01

    Full Text Available Purpose. The task of the operational distribution of train traffic volume on the sections of operating domain is the optimization one. It is solved in the operational conditions by the dispatch station. The article sets the problem of formalizing and finding the new ways to solve this urgent problem. Methodology. A new approach to solving the problem of operational distribution of train traffic volume on the sections of the rail network with a choice of routes for all train traffics was proposed. Findings. A study of possible routes for the train traffic handle on the operating domain used for mass freight transportations between Krivyi Rih and Donbas was carried out. The use of the proposed method allowed us to obtain a rational distribution of trains on the rail network sections. Originality. The method of train traffic volume distribution in the network under operational conditions was improved. The method, as opposed to the current one allows one to select the route of separate units handle (according to the criteria of the weighted average cost for 1 ton of cargo. Practical value. The use of the proposed technology of the operational distribution of train traffic volume will increase the efficiency of the railways in general and ensure the competitiveness of rail transportations. The methodology implementation involves the use of railway dispatch station for the automated workplaces with appropriate informational support.

  8. Flight Technical Error Analysis of the SATS Higher Volume Operations Simulation and Flight Experiments

    Science.gov (United States)

    Williams, Daniel M.; Consiglio, Maria C.; Murdoch, Jennifer L.; Adams, Catherine H.

    2005-01-01

    This paper provides an analysis of Flight Technical Error (FTE) from recent SATS experiments, called the Higher Volume Operations (HVO) Simulation and Flight experiments, which NASA conducted to determine pilot acceptability of the HVO concept for normal operating conditions. Reported are FTE results from simulation and flight experiment data indicating the SATS HVO concept is viable and acceptable to low-time instrument rated pilots when compared with today s system (baseline). Described is the comparative FTE analysis of lateral, vertical, and airspeed deviations from the baseline and SATS HVO experimental flight procedures. Based on FTE analysis, all evaluation subjects, low-time instrument-rated pilots, flew the HVO procedures safely and proficiently in comparison to today s system. In all cases, the results of the flight experiment validated the results of the simulation experiment and confirm the utility of the simulation platform for comparative Human in the Loop (HITL) studies of SATS HVO and Baseline operations.

  9. D0 Central Tracking Solenoid Energization, Controls, Interlocks and Quench Protection Operating Procedures

    International Nuclear Information System (INIS)

    Hance, R.

    1998-01-01

    This procedure is used when it is necessary to operate the solenoid energization, controls, interlocks and quench detection system. Note that a separate procedure exists for operating the solenoid 'cryogenic' systems. Only D0 Control Room Operators or the Project Electrical Engineer are qualified to execute these procedures or operate the solenoid system. This procedure assumes that the operator is familiar with using the Distributed Manufacturing Automation and Control Software (DMACS).

  10. Standard Operating Procedures for Female Genital Sexual Pain

    DEFF Research Database (Denmark)

    Fugl-Meyer, Kerstin S; Bohm-Starke, Nina; Damsted Petersen, Christina

    2012-01-01

    Introduction.  Female genital sexual pain (GSP) is a common, distressing complaint in women of all ages that is underrecognized and undertreated. Definitions and terminology for female GSP are currently being debated. While some authors have suggested that GSP is not per se a sexual dysfunction......, but rather a localized genial pain syndrome, others adhere to using clearly sexually related terms such as dyspareunia and vaginismus. Aim.  The aims of this brief review are to present definitions of the different types of female GSP. Their etiology, incidence, prevalence, and comorbidity with somatic......-Meyer KS, Bohm-Starke N, Damsted Petersen C, Fugl-Meyer A, Parish S, and Giraldi A. Standard operating procedures for female genital sexual pain. J Sex Med **;**:**-**....

  11. Quality assurance: Importance of systems and standard operating procedures.

    Science.gov (United States)

    Manghani, Kishu

    2011-01-01

    It is mandatory for sponsors of clinical trials and contract research organizations alike to establish, manage and monitor their quality control and quality assurance systems and their integral standard operating procedures and other quality documents to provide high-quality products and services to fully satisfy customer needs and expectations. Quality control and quality assurance systems together constitute the key quality systems. Quality control and quality assurance are parts of quality management. Quality control is focused on fulfilling quality requirements, whereas quality assurance is focused on providing confidence that quality requirements are fulfilled. The quality systems must be commensurate with the Company business objectives and business model. Top management commitment and its active involvement are critical in order to ensure at all times the adequacy, suitability, effectiveness and efficiency of the quality systems. Effective and efficient quality systems can promote timely registration of drugs by eliminating waste and the need for rework with overall financial and social benefits to the Company.

  12. HEMP emergency planning and operating procedures for electric power systems

    Energy Technology Data Exchange (ETDEWEB)

    Reddoch, T.W.; Markel, L.C. (Electrotek Concepts, Inc., Knoxville, TN (United States))

    1991-01-01

    Investigations of the impact of high-altitude electromagnetic pulse (HEMP) on electric power systems and electrical equipment have revealed that HEMP creates both misoperation and failures. These events result from both the early time E[sub 1] (steep-front pulse) component and the late time E[sub 3] (geomagnetic perturbations) component of HEMP. In this report a HEMP event is viewed in terms of its marginal impact over classical power system disturbances by considering the unique properties and consequences of HEMP. This report focuses on system-wide electrical component failures and their potential consequences from HEMP. In particular, the effectiveness of planning and operating procedures for electric systems is evaluated while under the influence of HEMP. This assessment relies on published data and characterizes utilities using the North American Electric Reliability Council's regions and guidelines to model electric power system planning and operations. Key issues addressed by the report include how electric power systems are affected by HEMP and what actions electric utilities can initiate to reduce the consequences of HEMP. The report also reviews the salient features of earlier HEMP studies and projects, examines technology trends in the electric power industry which are affected by HEMP, characterizes the vulnerability of power systems to HEMP, and explores the capability of electric systems to recover from a HEMP event.

  13. Improved Design of Crew Operation in Computerized Procedure System of APR1400

    Energy Technology Data Exchange (ETDEWEB)

    Seong, No Kyu; Jung, Yeon Sub; Sung, Chan Ho [KHNP, Daejeon (Korea, Republic of)

    2016-05-15

    The operators perform the paper-based procedures in analog-based conventional main control room (MCR) depending on only communications between operators except a procedure controller such as a Shift Supervisor (SS), however in digital-based MCR the operators can confirm the procedures simultaneously in own console when the procedure controller of computerized procedure (CP) opens the CP. The synchronization and a synchronization function between procedure controller and other operators has to be considered to support the function of crew operation. This paper suggests the improved design of crew operation in computerized procedure system of APR1400. This paper suggests the improved design of APR1400 CPS. These improvements can help operators perform the crew procedures more efficiently. And they reduce a burden of communication and misunderstanding of computerized procedures. These improvements can be applied to CPS after human factors engineering verification and validation.

  14. Recycle operations as a methodology for radioactive waste volume reduction

    International Nuclear Information System (INIS)

    Rasmussen, G.A.

    1985-01-01

    The costs for packaging, transportation and burial of low-level radioactive metallic waste have become so expensive that an alternate method of decontamination for volume reduction prior to disposal can now be justified. The operation of a large-scale centralized recycle center for decontamination of selected low level radioactive waste has been proven to be an effective method for waste volume reduction and for retrieving valuable materials for unlimited use. The centralized recycle center concept allows application of state-of-the-art decontamination technology resulting in a reduction in utility disposal costs and a reduction in overall net amount of material being buried. Examples of specific decontamination process activities at the centralized facility will be reviewed along with a discussion of the economic impact of decontamination for recycling and volume reduction. Based on almost two years of operation of a centralized decontamination facility, a demonstrated capability exists. The concept has been cost effective and proves that valuable resources can be recycled

  15. CONTROL PROCEDURES OF VOLUME OF ESTIMATED AND HARVESTED WOOD IN A PLANTATION OF Pinus spp. IN PARANÁ STATE

    Directory of Open Access Journals (Sweden)

    Silvane Vatraz

    2014-06-01

    Full Text Available http://dx.doi.org/10.5902/1980509814585The objective of this research was to improve the operating procedures of control of the volume of timber estimated by the forest inventory and the effectively harvested volume in order to reduce inconsistencies in the forest planning practiced in a forestry plantation of Pinus spp. in Paraná state. Accordingly, we used the tools of quality: storming and PDCA Cycle through an exploratory research project to study together. The study showed an inconsistency initial volume – 24,73% of the volume estimated by the inventory and the effectively harvested wood. This inconsistency was composed of operational failures in the activities of Forest Inventory (+13,84%, Forest Harvesting (+15,62% and Expedition Wood (-3,08%. The application of quality tools helped in the identification of inconsistency, as well as the revelation of operational failures, which suggested some routine monitoring and checking each of the activities involved in managing operational forestry.  

  16. Operational limits and conditions and operating procedures for nuclear power plants. Safety guide

    International Nuclear Information System (INIS)

    2005-01-01

    This Safety Guide was prepared as part of the Agency's programme for establishing safety standards relating to nuclear power plants. The present Safety Guide supersedes the IAEA Safety Guide on Operational Limits and Conditions for Nuclear Power Plants which was issued in 1979 as Safety Series No. 50-SG-O3. For a nuclear power plant to be operated in a safe manner, the provisions made in the final design and subsequent modifications shall be reflected in limitations on plant operating parameters and in the requirements on plant equipment and personnel. Under the responsibility of the operating organization, these shall be developed during the design safety evaluation as a set of operational limits and conditions (OLCs). A major contribution to compliance with the OLCs is made by the development and utilization of operating procedures (OPs) that are consistent with and fully implement the OLCs. The requirements for the OLCs and OPs are established in Section 5 of the IAEA Safety Requirements publication Safety of Nuclear Power Plants: Operation, which this Safety Guide supplements. The purpose of this Safety Guide is to provide guidance on the development, content and implementation of OLCs and OPs. The Safety Guide is directed at both regulators and owners/operators. This Safety Guide covers the concept of OLCs, their content as applicable to land based stationary power plants with thermal neutron reactors, and the responsibilities of the operating organization regarding their establishment, modification, compliance and documentation. The OPs to support the implementation of the OLCs and to ensure their observance are also within the scope of this Safety Guide. The particular aspects of the procedures for maintenance, surveillance, in-service inspection and other safety related activities in connection with the safe operation of nuclear power plants are outside the scope of this Safety Guide but can be found in other IAEA Safety Guides. Section 2 indicates the

  17. Operational limits and conditions and operating procedures for nuclear power plants. Safety guide

    International Nuclear Information System (INIS)

    2000-01-01

    This Safety Guide was prepared as part of the Agency's programme for establishing safety standards relating to nuclear power plants. The present Safety Guide supersedes the IAEA Safety Guide on Operational Limits and Conditions for Nuclear Power Plants which was issued in 1979 as Safety Series No. 50-SG-O3. For a nuclear power plant to be operated in a safe manner, the provisions made in the final design and subsequent modifications shall be reflected in limitations on plant operating parameters and in the requirements on plant equipment and personnel. Under the responsibility of the operating organization, these shall be developed during the design safety evaluation as a set of operational limits and conditions (OLCs). A major contribution to compliance with the OLCs is made by the development and utilization of operating procedures (OPs) that are consistent with and fully implement the OLCs. The requirements for the OLCs and OPs are established in Section 5 of the IAEA Safety Requirements publication Safety of Nuclear Power Plants: Operation, which this Safety Guide supplements. The purpose of this Safety Guide is to provide guidance on the development, content and implementation of OLCs and OPs. The Safety Guide is directed at both regulators and owners/operators. This Safety Guide covers the concept of OLCs, their content as applicable to land based stationary power plants with thermal neutron reactors, and the responsibilities of the operating organization regarding their establishment, modification, compliance and documentation. The OPs to support the implementation of the OLCs and to ensure their observance are also within the scope of this Safety Guide. The particular aspects of the procedures for maintenance, surveillance, in-service inspection and other safety related activities in connection with the safe operation of nuclear power plants are outside the scope of this Safety Guide but can be found in other IAEA Safety Guides. Section 2 indicates the

  18. Standard operating procedures for ESPEN guidelines and consensus papers.

    Science.gov (United States)

    Bischoff, Stephan C; Singer, Pierre; Koller, Michael; Barazzoni, Rocco; Cederholm, Tommy; van Gossum, André

    2015-12-01

    The ESPEN Guideline standard operating procedures (SOP) is based on the methodology provided by the Association of Scientific Medical Societies of Germany (AWMF), the Scottish Intercollegiate Guidelines Network (SIGN), and the Centre for Evidence-based Medicine at the University of Oxford. The SOP is valid and obligatory for all future ESPEN-sponsored guideline projects aiming to generate high-quality guidelines on a regular basis. The SOP aims to facilitate the preparation of guideline projects, to streamline the consensus process, to ensure quality and transparency, and to facilitate the dissemination and publication of ESPEN guidelines. To achieve this goal, the ESPEN Guidelines Editorial board (GEB) has been established headed by two chairmen. The GEB will support and supervise the guideline processes and is responsible for the strategic planning of ESPEN guideline activities. Key elements of the SOP are the generation of well-built clinical questions according to the PICO system, a systemic literature search, a classification of the selected literature according to the SIGN evidence levels providing an evidence table, and a clear and straight-forward consensus procedure consisting of online voting's and a consensus conference. Only experts who meet the obligation to disclosure any potential conflict of interests and who are not employed by the Industry can participate in the guideline process. All recommendations will be graded according to the SIGN grading and novel outcome models besides biomedical endpoints. This approach will further extent the leadership of ESPEN in creating up-to-date and suitable for implementation guidelines and in sharing knowledge on malnutrition and clinical nutrition. Copyright © 2015 Elsevier Ltd and European Society for Clinical Nutrition and Metabolism. All rights reserved.

  19. Clinical target volume delineation in glioblastomas: pre-operative versus post-operative/pre-radiotherapy MRI

    Science.gov (United States)

    Farace, P; Giri, M G; Meliadò, G; Amelio, D; Widesott, L; Ricciardi, G K; Dall'Oglio, S; Rizzotti, A; Sbarbati, A; Beltramello, A; Maluta, S; Amichetti, M

    2011-01-01

    Objectives Delineation of clinical target volume (CTV) is still controversial in glioblastomas. In order to assess the differences in volume and shape of the radiotherapy target, the use of pre-operative vs post-operative/pre-radiotherapy T1 and T2 weighted MRI was compared. Methods 4 CTVs were delineated in 24 patients pre-operatively and post-operatively using T1 contrast-enhanced (T1PRECTV and T1POSTCTV) and T2 weighted images (T2PRECTV and T2POSTCTV). Pre-operative MRI examinations were performed the day before surgery, whereas post-operative examinations were acquired 1 month after surgery and before chemoradiation. A concordance index (CI) was defined as the ratio between the overlapping and composite volumes. Results The volumes of T1PRECTV and T1POSTCTV were not statistically different (248 ± 88 vs 254 ± 101), although volume differences >100 cm3 were observed in 6 out of 24 patients. A marked increase due to tumour progression was shown in three patients. Three patients showed a decrease because of a reduced mass effect. A significant reduction occurred between pre-operative and post-operative T2 volumes (139 ± 68 vs 78 ± 59). Lack of concordance was observed between T1PRECTV and T1POSTCTV (CI = 0.67 ± 0.09), T2PRECTV and T2POSTCTV (CI = 0.39 ± 0.20) and comparing the portion of the T1PRECTV and T1POSTCTV not covered by that defined on T2PRECTV images (CI = 0.45 ± 0.16 and 0.44 ± 0.17, respectively). Conclusion Using T2 MRI, huge variations can be observed in peritumoural oedema, which are probably due to steroid treatment. Using T1 MRI, brain shifts after surgery and possible progressive enhancing lesions produce substantial differences in CTVs. Our data support the use of post-operative/pre-radiotherapy T1 weighted MRI for planning purposes. PMID:21045069

  20. A Multiscale Enrichment Procedure for Nonlinear Monotone Operators

    KAUST Repository

    Efendiev, Yalchin R.

    2014-03-11

    In this paper, multiscale finite element methods (MsFEMs) and domain decomposition techniques are developed for a class of nonlinear elliptic problems with high-contrast coefficients. In the process, existing work on linear problems [Y. Efendiev, J. Galvis, R. Lazarov, S. Margenov and J. Ren, Robust two-level domain decomposition preconditioners for high-contrast anisotropic flows in multiscale media. Submitted.; Y. Efendiev, J. Galvis and X. Wu, J. Comput. Phys. 230 (2011) 937–955; J. Galvis and Y. Efendiev, SIAM Multiscale Model. Simul. 8 (2010) 1461–1483.] is extended to treat a class of nonlinear elliptic operators. The proposed method requires the solutions of (small dimension and local) nonlinear eigenvalue problems in order to systematically enrich the coarse solution space. Convergence of the method is shown to relate to the dimension of the coarse space (due to the enrichment procedure) as well as the coarse mesh size. In addition, it is shown that the coarse mesh spaces can be effectively used in two-level domain decomposition preconditioners. A number of numerical results are presented to complement the analysis.

  1. A comparison of procedures for unpairing conditioned reflexive motivating operations.

    Science.gov (United States)

    Kettering, Tracy L; Neef, Nancy A; Kelley, Michael E; Heward, William L

    2018-03-01

    This study compared the effectiveness of two procedures to reduce behavior evoked by a reflexive conditioned motivating operation (CMO-R). Task demands were shown to evoke escape-maintained problem behavior for 4 students with disabilities. Alternative communication responses were taught as an appropriate method to request escape and this treatment combined with extinction for problem behavior led to decreases in problem behavior for all students. A beeping timer was then arranged to temporally precede the task demand to create a CMO-R that evoked communication responses. When data showed that the sound of the timer was functioning as a CMO-R, two methods to reduce behavior evoked by a CMO-R-extinction unpairing and noncontingent unpairing-were evaluated. Results indicated that noncontingent unpairing was an effective method to reduce the evocative effects of the CMO-R. Extinction produced unsystematic effects across participants. Results are discussed in terms of abolishing CMOs and the implications of CMOs. © 2018 Society for the Experimental Analysis of Behavior.

  2. Quality assurance: Importance of systems and standard operating procedures

    Directory of Open Access Journals (Sweden)

    Kishu Manghani

    2011-01-01

    Full Text Available It is mandatory for sponsors of clinical trials and contract research organizations alike to establish, manage and monitor their quality control and quality assurance systems and their integral standard operating procedures and other quality documents to provide high-quality products and services to fully satisfy customer needs and expectations. Quality control and quality assurance systems together constitute the key quality systems. Quality control and quality assurance are parts of quality management. Quality control is focused on fulfilling quality requirements, whereas quality assurance is focused on providing confidence that quality requirements are fulfilled. The quality systems must be commensurate with the Company business objectives and business model. Top management commitment and its active involvement are critical in order to ensure at all times the adequacy, suitability, effectiveness and efficiency of the quality systems. Effective and efficient quality systems can promote timely registration of drugs by eliminating waste and the need for rework with overall financial and social benefits to the Company.

  3. The insertion device magnetic measurement facility: Prototype and operational procedures

    International Nuclear Information System (INIS)

    Burkel, L.; Dejus, R.; Maines, J.; O'Brien, J.; Vasserman, I.; Pfleuger, J.

    1993-03-01

    This report is a description of the current status of the magnetic measurement facility and is a basic instructional manual for the operation of the facility and its components. Please refer to the appendices for more detailed information about specific components and procedures. The purpose of the magnetic measurement facility is to take accurate measurements of the magnetic field in the gay of the IDs in order to determine the effect of the ID on the stored particle beam and the emitted radiation. The facility will also play an important role when evaluating new ideas, novel devices, and inhouse prototypes as part of the ongoing research and development program at the APS. The measurements will be performed with both moving search coils and moving Hall probes. The IDs will be evaluated by computer modeling of the emitted radiation for any given (measured) magnetic field map. The quality of the magnetic field will be described in terms of integrated multipoles for the effect on Storage Ring performance and in terms of the derived trajectories for the emitted radiation. Before being installed on the Storage Ring, every device will be measured and characterized to assure that it is compatible with Storage Ring requirements and radiation specifications. The accuracy that the APS needs to achieve for magnetic measurements will be based on these specifications

  4. Manual of Standard Operating Procedures for Veterinary Drug Residue Analysis

    International Nuclear Information System (INIS)

    2016-01-01

    Laboratories are crucial to national veterinary drug residue monitoring programmes. However, one of the main challenges laboratories encounter is obtaining access to relevant methods of analysis. Thus, in addition to training, providing technical advice and transferring technology, the Joint FAO/IAEA Division of Nuclear Techniques in Food and Agriculture has resolved to develop clear and practical manuals to support Member State laboratories. The Coordinated Research Project (CRP) on Development of Radiometric and Allied Analytical Methods to Strengthen Residue Control Programs for Antibiotic and Anthelmintic Veterinary Drug Residues has developed a number of analytical methods as standard operating procedures (SOPs), which are now compiled here. This publication contains SOPs on chromatographic and spectrometric techniques, as well as radioimmunoassay and associated screening techniques, for various anthelmintic and antimicrobial veterinary drug residue analysis. Some analytical method validation protocols are also included. The publication is primarily aimed at food and environmental safety laboratories involved in testing veterinary drug residues, including under organized national residue monitoring programmes. It is expected to enhance laboratory capacity building and competence through the use of radiometric and complementary tools and techniques. The publication is also relevant for applied research on residues of veterinary drugs in food and environmental samples

  5. NEPTUNIX 2: Operating on computers network - Catalogued procedures

    International Nuclear Information System (INIS)

    Roux, Pierre.

    1982-06-01

    NEPTUNIX 2 is a package which carries out the simulation of complex processes described by numerous non linear algebro-differential equations. Main features are: non linear or time dependent parameters, implicit form, stiff systems, dynamic change of equations leading to discontinuities on some variables. Thus the mathematical model is built with an equations set F(x,x',1,t), where t is the independent variable, x' the derivative of x and 1 an ''algebrized'' logical variable. The NEPTUNIX 2 package is divided into two successive major steps: a non numerical step and a numerical step. The numerical step, using results from a picture of the model translated in FORTRAN language, in a form fitted for the executive computer, carries out the simulmations; in this way, NEPTUNIX 2 numerical step is portable. On the opposite, the non numerical step must be executed on a series 370 IBM computer or on a compatible computer. The present manual describes NEPTUNIX 2 operating procedures when the two steps are executed on the same computer and also when the numerical step is executed on an other computer connected or not on the same computing network [fr

  6. New Procedure for Account Operations at the CERN Service Desk

    CERN Multimedia

    The Computer Security Team

    2011-01-01

    Who can activate your computing account? Who can unblock it? And who can reset your password if you've forgotten it? Until recently, users who addressed such problems to the Service Desk were asked a set of questions...   The corresponding answers were designed to properly verify the requestor’s identity such that only the real owner could activate/unblock/reset his computing account. However, it turned out that the answers were easily obtainable (and that there is no better set of questions to ask). Therefore, in order to ensure optimal protection of your account, this procedure will be replaced on 28 November 2011. From that date on, users will be asked to produce a physical ID when requesting the Service Desk to perform operations like computer account activation, account unblocking or password resets. This physical ID can either be a passport/ID card or the CERN access card. If you need to activate/unblock/reset your computing account, you will either have to produ...

  7. Rejecting escape events in large volume Ge detectors by a pulse shape selection procedure

    International Nuclear Information System (INIS)

    Del Zoppo, A.; Agodi, C.; Alba, R.; Bellia, G.; Coniglione, R.; Loukachine, K.; Maiolino, C.; Migneco, E.; Piattelli, P.; Santonocito, D.; Sapienza, P.

    1993-01-01

    The dependence of the response to γ-rays of a large volume Ge detector on the interval width of a selected initial rise pulse slope is investigated. The number of escape events associated with a small pulse slope is found to be greater than the corresponding number of full energy events. An escape event rejection procedure based on the observed correlation between energy deposition and pulse shape is discussed. Such a procedure seems particularly suited for the design of highly granular large volume Ge detector arrays. (orig.)

  8. The operators' non-compliance behavior to conduct emergency operating procedures--comparing with the work experience and the complexity of procedural steps

    International Nuclear Information System (INIS)

    Park, Jinkyun; Jung, Wondea

    2003-01-01

    Many kinds of procedures have been used to reduce the operators' workload throughout various industries, such as in the aviation, the chemical and the nuclear industry. It is remarkable that, however, significant portion of accidents or incidents was caused by procedure related human error due to non-compliance of procedures. In this study, to investigate the operators' non-compliance behavior, emergency-training records were collected using a full scope simulator. And three types of the operators' behavior (such as strict adherence, skipping redundant actions and modifying action sequences) observed from collected emergency training records were compared with both their work experience and the complexity of procedural steps. As the results, three remarkable relationships are obtained. They are: (1) the operators who have an intermediate work experience seem to frequently adopt non-compliance behavior to conduct the procedural steps, (2) the operators seem to frequently adopt non-compliance behavior to conduct the procedural steps that have an intermediate procedural complexity, and (3) the senior reactor operators seem to accommodate their non-compliance behavior based on the complexity of procedural steps. Therefore, it is expected that these relationships can be used as meaningful clues not only to scrutinize the reason for non-compliance behavior but also to suggest appropriate remedies for the reduction of non-compliance behavior that can result in procedure related human error

  9. State Token Petri Net modeling method for formal verification of computerized procedure including operator's interruptions of procedure execution flow

    International Nuclear Information System (INIS)

    Kim, Yun Goo; Seong, Poong Hyun

    2012-01-01

    The Computerized Procedure System (CPS) is one of the primary operating support systems in the digital Main Control Room. The CPS displays procedure on the computer screen in the form of a flow chart, and displays plant operating information along with procedure instructions. It also supports operator decision making by providing a system decision. A procedure flow should be correct and reliable, as an error would lead to operator misjudgement and inadequate control. In this paper we present a modeling for the CPS that enables formal verification based on Petri nets. The proposed State Token Petri Nets (STPN) also support modeling of a procedure flow that has various interruptions by the operator, according to the plant condition. STPN modeling is compared with Coloured Petri net when they are applied to Emergency Operating Computerized Procedure. A converting program for Computerized Procedure (CP) to STPN has been also developed. The formal verification and validation methods of CP with STPN increase the safety of a nuclear power plant and provide digital quality assurance means that are needed when the role and function of the CPS is increasing.

  10. Philosophy, policies, and procedures - The three P's of flight-deck operations

    Science.gov (United States)

    Degani, Asaf; Wiener, Earl L.

    1991-01-01

    Standard operating procedures are drafted and provided to flightcrews to dictate the manner in which tasks are carried out. Failure to conform to Standard Operating Procedures (SOP) is frequently listed as the cause of violations, incidents, and accidents. However, procedures are often designed piecemeal, rather than being based on a sound philosophy of operations and policies that follow from such a philosophy. A framework of philosophy, policies, and procedures is proposed.

  11. UNC Nuclear Industries' human-factored approach to the operating or maintenance procedure

    International Nuclear Information System (INIS)

    Nelson, A.A.; Clark, J.E.

    1982-01-01

    The development of Human Factors Engineering (HFE) and UNC Nuclear Industries' (UNC) commitment to minimizing the potential for human error in the performance of operating or maintenance procedures have lead to a procedure upgrade program. Human-factored procedures were developed using information from many sources including, but not limited to, operators, a human factors specialist, engineers and supervisors. This has resulted in the Job Performance Aid (JPA). This paper presents UNC's approach to providing human-factored operating and maintenance procedures

  12. The Small Aircraft Transportation System (SATS), Higher Volume Operations (HVO) Concept and Research

    Science.gov (United States)

    Baxley, B.; Williams, D.; Consiglio, M.; Adams, C.; Abbott, T.

    2005-01-01

    The ability to conduct concurrent, multiple aircraft operations in poor weather at virtually any airport offers an important opportunity for a significant increase in the rate of flight operations, a major improvement in passenger convenience, and the potential to foster growth of operations at small airports. The Small Aircraft Transportation System, (SATS) Higher Volume Operations (HVO) concept is designed to increase capacity at the 3400 non-radar, non-towered airports in the United States where operations are currently restricted to one-in/one-out procedural separation during low visibility or ceilings. The concept s key feature is that pilots maintain their own separation from other aircraft using air-to-air datalink and on-board software within the Self-Controlled Area (SCA), an area of flight operations established during poor visibility and low ceilings around an airport without Air Traffic Control (ATC) services. While pilots self-separate within the SCA, an Airport Management Module (AMM) located at the airport assigns arriving pilots their sequence based on aircraft performance, position, winds, missed approach requirements, and ATC intent. The HVO design uses distributed decision-making, safe procedures, attempts to minimize pilot and controller workload, and integrates with today's ATC environment. The HVO procedures have pilots make their own flight path decisions when flying in Instrument Metrological Conditions (IMC) while meeting these requirements. This paper summarizes the HVO concept and procedures, presents a summary of the research conducted and results, and outlines areas where future HVO research is required. More information about SATS HVO can be found at http://ntrs.nasa.gov.

  13. Probabilistic safety analysis procedures guide, Sections 8-12. Volume 2, Rev. 1

    International Nuclear Information System (INIS)

    McCann, M.; Reed, J.; Ruger, C.; Shiu, K.; Teichmann, T.; Unione, A.; Youngblood, R.

    1985-08-01

    A procedures guide for the performance of probabilistic safety assessment has been prepared for interim use in the Nuclear Regulatory Commission programs. It will be revised as comments are received, and as experience is gained from its use. The probabilistic safety assessment studies performed are intended to produce probabilistic predictive models that can be used and extended by the utilities and by NRC to sharpen the focus of inquiries into a range of issues affecting reactor safety. The first volume of the guide describes the determination of the probability (per year) of core damage resulting from accident initiators internal to the plant (i.e., intrinsic to plant operation) and from loss of off-site electric power. The scope includes human reliability analysis, a determination of the importance of various core damage accident sequences, and an explicit treatment and display of uncertainties for key accident sequences. This second volume deals with the treatment of the so-called external events including seismic disturbances, fires, floods, etc. Ultimately, the guide will be augmented to include the plant-specific analysis of in-plant processes (i.e., containment performance). This guide provides the structure of a probabilistic safety study to be performed, and indicates what products of the study are valuable for regulatory decision making. For internal events, methodology is treated in the guide only to the extent necessary to indicate the range of methods which is acceptable; ample reference is given to alternative methodologies which may be utilized in the performance of the study. For external events, more explicit guidance is given

  14. Probabilistic safety analysis procedures guide. Sections 1-7 and appendices. Volume 1, Revision 1

    International Nuclear Information System (INIS)

    Bari, R.A.; Buslik, A.J.; Cho, N.Z.

    1985-08-01

    A procedures guide for the performance of probabilistic safety assessment has been prepared for interim use in the Nuclear Regulatory Commission programs. It will be revised as comments are received, and as experience is gained from its use. The probabilistic safety assessment studies performed are intended to produce probabilistic predictive models that can be used and extended by the utilities and by NRC to sharpen the focus of inquiries into a range of issues affecting reactor safety. This first volume of the guide describes the determination of the probability (per year) of core damage resulting from accident initiators internal to the plant (i.e., intrinsic to plant operation) and from loss of off-site electric power. The scope includes human reliability analysis, a determination of the importance of various core damage accident sequences, and an explicit treatment and display of uncertainties for key accident sequences. The second volume deals with the treatment of the so-called external events including seismic disturbances, fires, floods, etc. Ultimately, the guide will be augmented to include the plant-specific analysis of in-plant processes (i.e., containment performance). This guide provides the structure of a probabilistic safety study to be performed, and indicates what products of the study are valuable for regulatory decision making. For internal events, methodology is treated in the guide only to the extent necessary to indicate the range of methods which is acceptable; ample reference is given to alternative methodologies which may be utilized in the performance of the study. For external events, more explicit guidance is given

  15. Standard operating procedures in the disorders of orgasm and ejaculation.

    Science.gov (United States)

    McMahon, Chris G; Jannini, Emmanuele; Waldinger, Marcel; Rowland, David

    2013-01-01

    Ejaculatory/orgasmic disorders are common male sexual dysfunctions and include premature ejaculation (PE), inhibited ejaculation, anejaculation, retrograde ejaculation, and anorgasmia. To provide recommendations and guidelines of the current state-of-the-art knowledge for management of ejaculation/orgasmic disorders in men as standard operating procedures (SOPs) for the treating health care professional. The International Society of Sexual Medicine Standards Committee assembled over 30 multidisciplinary experts to establish SOPs for various male and female sexual medicine topics. The SOP for the management of disorders of orgasm and ejaculation represents the opinion of four experts from four countries developed in a process over a 2-year period. Expert opinion was based on grading of evidence-based medical literature, limited expert opinion, widespread internal committee discussion, public presentation, and debate. PE management is largely dependent upon etiology. Lifelong PE is best managed with PE pharmacotherapy (selective serotonin reuptake inhibitors and/or topical anesthetics). The management of acquired PE is etiology specific and may include erectile dysfunction (ED) pharmacotherapy in men with comorbid ED. All men seeking treatment for PE should receive basic psychosexual education. Graded behavioral therapy is indicated when psychogenic or relationship factors are present and is often best combined with PE pharmacotherapy in an integrated treatment program. Delayed ejaculation, anejaculation, and/or anorgasmia may have a biogenic and/or psychogenic etiology. Men with age-related penile hypoanesthesia should be educated, reassured, and instructed in revised sexual techniques which maximize arousal. Retrograde ejaculation is managed by education, patient reassurance, and pharmacotherapy. Additional research is required to further the understanding of the disorders of ejaculation and orgasm. © 2012 International Society for Sexual Medicine.

  16. FFTF fuel pin design procedure verification for transient operation

    International Nuclear Information System (INIS)

    Baars, R.E.

    1975-05-01

    The FFTF design procedures for evaluating fuel pin transient performance are briefly reviewed, and data where available are compared with design procedure predictions. Specifically, burst conditions derived from Fuel Cladding Transient Tester (FCTT) tests and from ANL loss-of-flow tests are compared with burst pressures computed using the design procedure upon which the cladding integrity limit was based. Failure times are predicted using the design procedure for evaluation of rapid reactivity insertion accidents, for five unterminated TREAT experiments in which well characterized fuel failures were deliberately incurred. (U.S.)

  17. A symptom based decision tree approach to boiling water reactor emergency operating procedures

    International Nuclear Information System (INIS)

    Knobel, R.C.

    1984-01-01

    This paper describes a Decision Tree approach to development of BWR Emergency Operating Procedures for use by operators during emergencies. This approach utilizes the symptom based Emergency Procedure Guidelines approved for implementation by the USNRC. Included in the paper is a discussion of the relative merits of the event based Emergency Operating Procedures currently in use at USBWR plants. The body of the paper is devoted to a discussion of the Decision Tree Approach to Emergency Operating Procedures soon to be implemented at two United States Boiling Water Reactor plants, why this approach solves many of the problems with procedures indentified in the post accident reviews of Three Mile Island procedures, and why only now is this approach both desirable and feasible. The paper discusses how nuclear plant simulators were involved in the development of the Emergency Operating Procedure decision trees, and in the verification and validation of these procedures. (orig./HP)

  18. 21 CFR 606.100 - Standard operating procedures.

    Science.gov (United States)

    2010-04-01

    ... units. (9) Procedures for investigating adverse donor and recipient reactions. (10) Storage temperatures... accurately relating the product(s) to the donor. (5) Blood collection procedure, including in-process precautions taken to measure accurately the quantity of blood removed from the donor. (6) Methods of component...

  19. The procedure execution manager and its application to Advanced Photon Source operation

    International Nuclear Information System (INIS)

    Borland, M.

    1997-01-01

    The Procedure Execution Manager (PEM) combines a complete scripting environment for coding accelerator operation procedures with a manager application for executing and monitoring the procedures. PEM is based on Tcl/Tk, a supporting widget library, and the dp-tcl extension for distributed processing. The scripting environment provides support for distributed, parallel execution of procedures along with join and abort operations. Nesting of procedures is supported, permitting the same code to run as a top-level procedure under operator control or as a subroutine under control of another procedure. The manager application allows an operator to execute one or more procedures in automatic, semi-automatic, or manual modes. It also provides a standard way for operators to interact with procedures. A number of successful applications of PEM to accelerator operations have been made to date. These include start-up, shutdown, and other control of the positron accumulator ring (PAR), low-energy transport (LET) lines, and the booster rf systems. The PAR/LET procedures make nested use of PEM's ability to run parallel procedures. There are also a number of procedures to guide and assist tune-up operations, to make accelerator physics measurements, and to diagnose equipment. Because of the success of the existing procedures, expanded use of PEM is planned

  20. Feasibility study report for Operable Unit 4: Volume 2

    International Nuclear Information System (INIS)

    1994-02-01

    This report documents the Feasibility Study (FS) phase of the Fernald Environmental Management Project (FEMP) Operable Unit 4 Remedial Investigation/Feasibility Study (RI/FS) Program. The FEMP, formerly known as the Feed Materials Production Center (FMPC), is a US Department of Energy (DOE) facility that operated from 1952 to 1989. The facility's primarily function was to provide high purity uranium metal products to support United States defense programs. Production operations were suspended in 1989 to focus on environmental restoration and waste management activities at the facility. The RI/FS is being conducted pursuant to the terms of a Consent Agreement between DOE and the US Environmental Protection Agency (EPA) under Sections 120 and 106(a) of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended. The Ohio Environmental Protection Agency (OEPA) is also participating in the RI/FS process at the FEMP through direct involvement in program review meetings and technical review of project documentation. The objective of the RI/FS process is to gather information to support an informed risk management decision regarding which remedy appears to be the most appropriate action for addressing the environmental concerns identified at the FEMP. This volume contains appendices A--E

  1. Procedural volume, cost, and reimbursement of outpatient incisional hernia repair: implications for payers and providers.

    Science.gov (United States)

    Song, Chao; Liu, Emelline; Tackett, Scott; Shi, Lizheng; Marcus, Daniel

    2017-06-01

    This analysis aimed to evaluate trends in volumes and costs of primary elective incisional ventral hernia repairs (IVHRs) and investigated potential cost implications of moving procedures from inpatient to outpatient settings. A time series study was conducted using the Premier Hospital Perspective ® Database (Premier database) for elective IVHR identified by International Classification of Diseases, Ninth revision, Clinical Modification codes. IVHR procedure volumes and costs were determined for inpatient, outpatient, minimally invasive surgery (MIS), and open procedures from January 2008-June 2015. Initial visit costs were inflation-adjusted to 2015 US dollars. Median costs were used to analyze variation by site of care and payer. Quantile regression on median costs was conducted in covariate-adjusted models. Cost impact of potential outpatient migration was estimated from a Medicare perspective. During the study period, the trend for outpatient procedures in obese and non-obese populations increased. Inpatient and outpatient MIS procedures experienced a steady growth in adoption over their open counterparts. Overall median costs increased over time, and inpatient costs were often double outpatient costs. An economic model demonstrated that a 5% shift of inpatient procedures to outpatient MIS procedures can have a cost surplus of ∼ US $1.8 million for provider or a cost-saving impact of US $1.7 million from the Centers for Medicare & Medicaid Services perspective. The study was limited by information in the Premier database. No data were available for IVHR cases performed in free-standing ambulatory surgery centers or federal healthcare facilities. Volumes and costs of outpatient IVHRs and MIS procedures increased from January 2008-June 2015. Median costs were significantly higher for inpatients than outpatients, and the difference was particularly evident for obese patients. A substantial cost difference between inpatient and outpatient MIS cases

  2. Sedation for procedures outside the operating room in children

    International Nuclear Information System (INIS)

    Molina Rodriguez, Ericka

    2014-01-01

    Sedation is defined in the pediatric population. An adequate preoperative assessment is established in patients subjected to a sedation. Fundamental characteristics of drugs used during a sedation are determined. Recommendations about surveillance and monitoring are established in a patient sedated. Principal characteristics of sedation are defined in patients exposed to radiological diagnostic and therapeutic procedures. Considerations in sedation are identified for procedures in the laboratory of digestive endoscopy. Alternatives of sedation are mentioned for oncological patients subjected to invasive procedures. Working conditions and specifications of anesthesia are determined in the cardiac catheterization room [es

  3. Apollo-Soyuz test project. Operations handbook command/service/docking modules (CSM 119/DM 1): Operational procedures reference issue

    Science.gov (United States)

    1974-01-01

    Operational and configuration checks for the Apollo-Soyuz Test Project are presented. The checks include: backup crew prelaunch, prime crew prelaunch, boost and insertion, G and C reference data, G and N reference modes, rendezvous, navigation, Apollo-Soyuz operations, abort procedures, and emergency procedures.

  4. Transuranic (TRU) waste volume reduction operations at a plutonium facility

    International Nuclear Information System (INIS)

    Cournoyer, Michael E.; Nixon, Archie E.; Fife, Keith W.; Sandoval, Arnold M.; Garcia, Vincent E.; Dodge, Robert L.

    2011-01-01

    Programmatic operations at the Los Alamos National Laboratory Plutonium Facility (TA-55) involve working with various amounts of plutonium and other highly toxic, alpha-emitting materials. The spread of radiological contamination on surfaces, airborne contamination, and excursions of contaminants into the operator's breathing zone are prevented through use of a variety of gloveboxes (the glovebox, coupled with an adequate negative pressure gradient, provides primary confinement). Size-reduction operations on glovebox equipment are a common activity when a process has been discontinued and the room is being modified to support a new customer. The Actinide Processing Group at TA-55 uses one-meter or longer glass columns to process plutonium. Disposal of used columns is a challenge, since they must be size-reduced to get them out of the glovebox. The task is a high-risk operation because the glass shards that are generated can puncture the bag-out bags, leather protectors, glovebox gloves, and the worker's skin when completing the task. One of the Lessons Learned from these operations is that Laboratory management should critically evaluate each hazard and provide more effective measures to prevent personnel injury. A bag made of puncture-resistant material was one of these enhanced controls. We have investigated the effectiveness of these bags and have found that they safely and effectively permit glass objects to be reduced to small pieces with a plastic or rubber mallet; the waste can then be easily poured into a container for removal from the glovebox as non-compactable transuranic (TRU) waste. This size-reduction operation reduces solid TRU waste volume generation by almost 2½ times. Replacing one-time-use bag-out bags with multiple-use glass crushing bags also contributes to reducing generated waste. In addition, significant costs from contamination, cleanup, and preparation of incident documentation are avoided. This effort contributes to the Los Alamos

  5. Evaluation of nuclear power plant operating procedures classifications and interfaces: Problems and techniques for improvement

    International Nuclear Information System (INIS)

    Barnes, V.E.; Radford, L.R.

    1987-02-01

    This report presents activities and findings of a project designed to evaluate current practices and problems related to procedure classification schemes and procedure interfaces in commercial nuclear power plants. The phrase ''procedure classification scheme'' refers to how plant operating procedures are categorized and indexed (e.g., normal, abnormal, emergency operating procedures). The term ''procedure interface'' refers to how reactor operators are instructed to transition within and between procedures. The project consisted of four key tasks, including (1) a survey of literature regarding problems associated with procedure classifications and interfaces, as well as techniques for overcoming them; (2) interviews with experts in the nuclear industry to discuss the appropriate scope of different classes of operating procedures and techniques for managing interfaces between them; (3) a reanalysis of data gathered about nuclear power plant normal operating and off-normal operating procedures in a related project, ''Program Plan for Assessing and Upgrading Operating Procedures for Nuclear Power Plants''; and (4) solicitation of the comments and expert opinions of a peer review group on the draft project report and on proposed techniques for resolving classification and interface issues. In addition to describing these activities and their results, recommendations for NRC and utility actions to address procedure classification and interface problems are offered

  6. Identifying cognitive complexity factors affecting the complexity of procedural steps in emergency operating procedures of a nuclear power plant

    International Nuclear Information System (INIS)

    Park, Jinkyun; Jeong, Kwangsup; Jung, Wondea

    2005-01-01

    In complex systems such as a nuclear and chemical plant, it is well known that the provision of understandable procedures that allow operators to clarify what needs to be done and how to do it is one of the requisites to secure their safety. As a previous study in providing understandable procedures, the step complexity (SC) measure that can quantify the complexity of procedural steps in emergency operating procedures (EOPs) of a nuclear power plant (NPP) was suggested. However, the necessity of additional complexity factors that can consider a cognitive aspect in evaluating the complexity of procedural steps is raised. To this end, the comparisons between operators' performance data measured by the form of a step performance time with their behavior in carrying out the prescribed activities of procedural steps are conducted in this study. As a result, two kinds of complexity factors (the abstraction level of knowledge and the level of engineering decision) that could affect an operator's cognitive burden are identified. Although a well-designed experiment is indispensable for confirming the appropriateness of the additional complexity factors, it is strongly believed that the change of operators' performance data can be more authentically explained if the additional complexity factors are taken into consideration

  7. Identifying cognitive complexity factors affecting the complexity of procedural steps in emergency operating procedures of a nuclear power plant

    Energy Technology Data Exchange (ETDEWEB)

    Park, Jinkyun [Integrated Safety Assessment Division, Korea Atomic Energy Research Institute, P.O. Box 105, Duckjin-Dong, Yusong-Ku, Taejon 305-600 (Korea, Republic of)]. E-mail: kshpjk@kaeri.re.kr; Jeong, Kwangsup [Integrated Safety Assessment Division, Korea Atomic Energy Research Institute, P.O. Box 105, Duckjin-Dong, Yusong-Ku, Taejon 305-600 (Korea, Republic of); Jung, Wondea [Integrated Safety Assessment Division, Korea Atomic Energy Research Institute, P.O. Box 105, Duckjin-Dong, Yusong-Ku, Taejon 305-600 (Korea, Republic of)

    2005-08-01

    In complex systems such as a nuclear and chemical plant, it is well known that the provision of understandable procedures that allow operators to clarify what needs to be done and how to do it is one of the requisites to secure their safety. As a previous study in providing understandable procedures, the step complexity (SC) measure that can quantify the complexity of procedural steps in emergency operating procedures (EOPs) of a nuclear power plant (NPP) was suggested. However, the necessity of additional complexity factors that can consider a cognitive aspect in evaluating the complexity of procedural steps is raised. To this end, the comparisons between operators' performance data measured by the form of a step performance time with their behavior in carrying out the prescribed activities of procedural steps are conducted in this study. As a result, two kinds of complexity factors (the abstraction level of knowledge and the level of engineering decision) that could affect an operator's cognitive burden are identified. Although a well-designed experiment is indispensable for confirming the appropriateness of the additional complexity factors, it is strongly believed that the change of operators' performance data can be more authentically explained if the additional complexity factors are taken into consideration.

  8. Identifying cognitive complexity factors affecting the complexity of procedural steps in emergency operating procedures of a nuclear power plant

    Energy Technology Data Exchange (ETDEWEB)

    Jinkyun Park; Kwangsup Jeong; Wondea Jung [Korea Atomic Energy Research Institute, Taejon (Korea). Integrated Safety Assessment Division

    2005-08-15

    In complex systems such as a nuclear and chemical plant, it is well known that the provision of understandable procedures that allow operators to clarify what needs to be done and how to do it is one of the requisites to secure their safety. As a previous study in providing understandable procedures, the step complexity (SC) measure that can quantify the complexity of procedural steps in emergency operating procedures (EOPs) of a nuclear power plant (NPP) was suggested. However, the necessity of additional complexity factors that can consider a cognitive aspect in evaluating the complexity of procedural steps is raised. To this end, the comparisons between operator' performance data measured by the form of a step performance time with their behavior in carrying out the prescribed activities of procedural steps are conducted in this study. As a result, two kinds of complexity factors (the abstraction level of knowledge and the level of engineering decision) that could affect an operator's cognitive burden are identified. Although a well-designed experiment is indispensable for confirming the appropriateness of the additional complexity factors, it is strongly believed that the change of operators' performance data can be more authentically explained if the additional complexity factors are taken into consideration. (author)

  9. Investigation of Causal Relationship between Stock Prices and Trading Volume using Toda and Yamamoto Procedure

    Directory of Open Access Journals (Sweden)

    Sushil BAJAJ

    2014-11-01

    Full Text Available The present study probes the relationship between the stock prices and trading volume. For achieving this purpose, daily data of adjusted closing stock prices, trading volume of 39 individual securities and S&P CNX Nifty from January 1, 1998 to May 31, 2013 have been used. In this study, instead of applying ordinary Granger causality test to investigate the relationship between stock prices and trading volume, Toda and Yamamoto (1995 procedure has been applied for analyzing the data. Lag length chosen by AIC and FPE criterion has been insured by running Lagrange Multiplier (LM test and causality determined by Toda and Yamamoto test has also been confirmed by using VAR methodology. Although, Toda and Yamamoto and VAR test produced little dissimilar results, nevertheless, the empirical analysis provides sufficient grounds to declare the presence of interaction between stock prices and trading volume.

  10. General least-squares fitting procedures to minimize the volume of a hyperellipsoid

    International Nuclear Information System (INIS)

    Wadlinger, E.A.

    1979-01-01

    Several methods for determining the shape parameters, which in two dimensions are the Courant-Snyder parameters, and the volume of an ellipse or hyperellipse that represent a set of phase-space points in a two or more dimensional hyperspace are presented. The ellipse parameters are useful for matching a beam to an accelerating or transport system and in studies of emittance growth. The fitting procedure minimizes the total volume of a hyperellipse by adjusting the ellipse shape parameters. The total volume is the sum of the individual particle volumes defined by the hyperellipse that passes through the phase-space point of a particle. A two-dimensional space is considered first; the results are then generalized to higher dimensions. Computer programs using these techniques were written. 1 figure

  11. A Neural Networks Based Operation Guidance System for Procedure Presentation and Validation

    International Nuclear Information System (INIS)

    Seung, Kun Mo; Lee, Seung Jun; Seong, Poong Hyun

    2006-01-01

    In this paper, a neural network based operator support system is proposed to reduce operator's errors in abnormal situations in nuclear power plants (NPPs). There are many complicated situations, in which regular and suitable operations should be done by operators accordingly. In order to regulate and validate operators' operations, it is necessary to develop an operator support system which includes computer based procedures with the functions for operation validation. Many computerized procedures systems (CPS) have been recently developed. Focusing on the human machine interface (HMI) design and procedures' computerization, most of CPSs used various methodologies to enhance system's convenience, reliability and accessibility. Other than only showing procedures, the proposed system integrates a simple CPS and an operation validation system (OVS) by using artificial neural network (ANN) for operational permission and quantitative evaluation

  12. Manual for the GAW Precipitation Chemistry Programme: Guidelines, Data Quality Objectives and Standard Operating Procedures

    National Research Council Canada - National Science Library

    Allan, Mary A

    2004-01-01

    This is a manual for the Global Atmosphere Watch Precipitation Chemistry (GAW-PC) Programme. Where possible, it describes standard operating procedures and otherwise provides guidance on methods and procedures...

  13. 7 CFR 70.110 - Requirements for sanitation, facilities, and operating procedures in official plants.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 3 2010-01-01 2010-01-01 false Requirements for sanitation, facilities, and operating... Requirements for sanitation, facilities, and operating procedures in official plants. (a) The requirements for sanitation, facilities, and operating procedures in official plants shall be the applicable provisions stated...

  14. Standard operating procedure for combustion of 14C - samples with OX-500 biological material oxidizer

    International Nuclear Information System (INIS)

    Nashriyah Mat.

    1995-01-01

    This procedure is for the purpose of safe operation of OX-500 biological material oxidizer. For ease of operation, the operation flow chart (including testing the system and sample combustion) and end of day maintenance flow chart were simplified. The front view, diagrams and switches are duly copied from operating manual. Steps on sample preparation are also included for biotic and a biotic samples. This operating procedure is subjected to future reviews

  15. Graded changes in enamel component volumes resulted from a short tooth bleaching procedure.

    Science.gov (United States)

    Ferreira, Artemisa Fernanda Moura; Perez, Flávia Maria de Moraes Ramos; Limeira Júnior, Francisco de Assis; de Moura, Mirella de Fátima Liberato; de Sousa, Frederico Barbosa

    2016-05-01

    To test the hypothesis that changes in enamel component volumes (mineral, organic, and water volumes, and permeability) are graded from outer to inner enamel after a short bleaching procedure. Extracted unerupted human third molars had half of their crowns bleached (single bleaching session, 3 × 15 min), and tooth shade changes in bleached parts were analyzed with a spectrophotometer. Ground sections were prepared, component volumes and permeability were quantified at histological points located at varying distances from the enamel surface (n=10 points/location), representing conditions before and after bleaching. Tooth shade changes were significant (pbleaching, except at the outer layers. Multiple analysis of covariances revealed that most of the variance of the change in enamel composition after bleaching was explained by the combination of the set of types of component volume (in decreasing order of relevance: mineral loss, organic gain, water gain, and decrease in permeability) with the set of distances from the enamel surface (graded from the enamel surface inward) (canonical R(2)=0.97; p99%). Changes in enamel composition after a short bleaching procedure followed a gradient within component volumes (mineral loss>organic gain>water gain>decrease in permeability) and decreased from the enamel surface inward. Copyright © 2016 Elsevier Ltd. All rights reserved.

  16. Developing operating procedures for a low-level radioactive waste disposal facility

    International Nuclear Information System (INIS)

    Sutherland, A.A.; Miner, G.L.; Grahn, K.F.; Pollard, C.G.

    1993-10-01

    This document is intended to assist persons who are developing operating and emergency procedures for a low-level radioactive waste disposal facility. It provides 25 procedures that are considered to be relatively independent of the characteristics of a disposal facility site, the facility design, and operations at the facility. These generic procedures should form a good starting point for final procedures on their subjects for the disposal facility. In addition, this document provides 55 annotated outlines of other procedures that are common to disposal facilities. The annotated outlines are meant as checklists to assist the developer of new procedures

  17. Developing operating procedures for a low-level radioactive waste disposal facility

    Energy Technology Data Exchange (ETDEWEB)

    Sutherland, A.A.; Miner, G.L.; Grahn, K.F.; Pollard, C.G. [Rogers and Associates Engineering Corp., Salt Lake City, UT (United States)

    1993-10-01

    This document is intended to assist persons who are developing operating and emergency procedures for a low-level radioactive waste disposal facility. It provides 25 procedures that are considered to be relatively independent of the characteristics of a disposal facility site, the facility design, and operations at the facility. These generic procedures should form a good starting point for final procedures on their subjects for the disposal facility. In addition, this document provides 55 annotated outlines of other procedures that are common to disposal facilities. The annotated outlines are meant as checklists to assist the developer of new procedures.

  18. Technical operations procedure for assembly and emplacement of the soil temperature test--test assembly

    International Nuclear Information System (INIS)

    Weber, A.P.

    1978-01-01

    A description is given of the plan for assembly, instrumentation, emplacement, and operational checkout of the soil temperature test assembly and dry well liner. The activities described cover all operations necessary to accomplish the receiving inspection, instrumentation and pre-construction handling of the dry well liner, plus all operations performed with the test article. Actual details of construction work are not covered by this procedure. Each part and/or section of this procedure is a separate function to be accomplished as required by the nature of the operation. The organization of the procedure is not intended to imply a special operational sequence or schedular requirement. Specific procedure operational sections include: receiving inspection; liner assembly operations; construction operations (by others); prepare shield plug; test article assembly and installation; and operational checkout

  19. Integrating standard operating procedures with spacecraft automation, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — Spacecraft automation has the potential to assist crew members and spacecraft operators in managing spacecraft systems during extended space missions. Automation can...

  20. Standing operating procedures for developing acute exposure guideline levels for hazardous chemicals

    National Research Council Canada - National Science Library

    National Research Council (U.S.). Subcommittee on Acute Exposure Guideline Levels

    2001-01-01

    Standing Operating Procedures for Developing Acute Exposure Guideline Levels for Hazardous Chemicals contains a detailed and comprehensive methodology for developing acute exposure guideline levels (AEGLs...

  1. 76 FR 78814 - National Voluntary Laboratory Accreditation Program; Operating Procedures

    Science.gov (United States)

    2011-12-20

    ... procedures were published to ensure their consistency with certain international standards and guidance... is amending the last sentence in section 285.4 as follows: change the third instance of the word ``and'' to ``or,'' and add the words ``to ensure open participation'' after the phrase ``other means...

  2. Operability test procedure for the TK-900 effluent monitoring station

    International Nuclear Information System (INIS)

    Weissenfels, R.D.

    1994-01-01

    This procedure will verify that the 221-B liquid effluent monitoring system, installed near the east end of the 6-in. chemical sewer header, functions as intended by design. TK-900B was installed near stairwell 3 in the 221-B electrical gallery by Project W-007H. The system is part of BAT/AKART for the BCE liquid effluent system

  3. 40 CFR 240.209-3 - Recommended procedures: Operations.

    Science.gov (United States)

    2010-07-01

    ... Occupational Respiratory Disease, National Institute for Occupational Safety and Health, Morgantown, W. Va. (c) Training in first aid practices and emergency procedures should be given all personnel. (d) Personal safety devices such as hard hats, gloves, safety glasses, and footwear should be provided for facility employees...

  4. Influence of operator experience and PCI volume on transfemoral access techniques: A collaboration of international cardiovascular societies.

    Science.gov (United States)

    Nelson, Daniel W; Damluji, Abdulla A; Patel, Nish; Valgimigli, Marco; Windecker, Stephan; Byrne, Robert; Nolan, James; Patel, Tejas; Brilakis, Emmanouil; Banerjee, Subhash; Mayol, Jorge; Cantor, Warren J; Alfonso, Carlos E; Rao, Sunil V; Moscucci, Mauro; Cohen, Mauricio G

    2018-03-01

    Transfemoral access (TFA) is widely used for coronary angiography and percutaneous coronary intervention (PCI). The influence of operator age, gender, experience, and procedural volume on performance of femoral arterial access has not been studied. A survey instrument was developed and distributed via e-mail from professional societies to interventional cardiologists worldwide from March to December 2016. A total of 988 physicians from 88 countries responded to the survey. TFA is the preferred approach for patients with cardiogenic shock, left main or bifurcation PCI, and procedures with mechanical circulatory support. Older (PCI volume operators (PCI: 57.3%; 100-299 PCI: 58.7%; ≥300 PCI: 64.3%, pPCI volume operators (≥300 PCI: 64.1%; 100-299 PCI: 72.6%; PCI: 67.9%, pPCI volume interventional cardiologists prefer not to use imaging for femoral access or perform femoral angiography during TF procedures. These data highlight opportunities to further reduce TFA complications. Copyright © 2017 Elsevier Inc. All rights reserved.

  5. Technical procedures for water resources, Deaf Smith County site, Texas: Volume 2: Environmental Field Program: Final draft

    International Nuclear Information System (INIS)

    1987-08-01

    This volume contains the following Technical Procedures pursuant to the Water Resources Site Study Plan operation of a Playa Lake conductivity monitoring station and processing of data from a Playa Lake conductivity monitoring station. This procedure defines steps and methods for the installation, operation, and maintenance of the Playa Lake conductivity monitoring stations. Conductivity measurements will be taken at six playa lakes in the site study area to record changes in total dissolved solids as a function of stage. Playa lake conductivity and stage (volume) measurements will be used, in conjunction with other water quality data collected at the Playa Lake and precipitation stations, to determine the mass of dissolved solids entering and leaving the playas. This baseline information on the pollutant mass balance of the playas will be used to assess potential changes in playa lake water quality and the magnitude of those changes due to site development. The pollutant mass balances will also be used on determining the source of pollutants. 2 refs., 5 figs

  6. Impact of operator fatigue on endoscopy performance: implications for procedure scheduling.

    LENUS (Irish Health Repository)

    Harewood, Gavin C

    2009-08-01

    With increasing volumes of endoscopic procedures, endoscopists\\' workload has had to increase to meet this escalating demand. The aim of this study was to characterize the impact of endoscopist fatigue on quality of endoscopy performance by comparing outcomes based on chronological procedure order.

  7. Development of an automated operating procedure system using fuzzy colored petri nets for nuclear power plants

    International Nuclear Information System (INIS)

    Lee, Seung Jun; Seong, Poong Hyun

    2002-01-01

    In this work, AuTomated Operating Procedure System (ATOPS) is developed. ATOPS is an automation system for operation of a nuclear power plant (NPP) which can monitor signals, diagnose statuses, and generate control actions according to corresponding operating procedures, without any human operator's help. Main functions of ATOPS are anomaly detection function and procedure execution function, but only the procedure execution function is implemented because this work is just the first step. In the procedure execution function, operating procedures of NPP are analyzed and modeled using Fuzzy Colored Petri Nets (FCPN), and executed depending on decision making of the inference engine. In this work, an ATOPS prototype is developed in order to demonstrate its feasibility and it is also validated using FISA-2/WS simulator. The validation is performed for the cases of a loss of coolant accident (LOCA) and a steam generator tube rupture (SGTR). The simulation results show that ATOPS works correctly in the emergency situations

  8. Operability test procedure for 244-U DCRT. Revision 1

    International Nuclear Information System (INIS)

    Erhart, M.F.

    1995-01-01

    This OPT will insure the operability of various systems and their general equipment, used in the operation of the 244-U DCRT. Systems that will be tested include the following: Leak Detection Systems; Heat Trace System; Vessel Temperature Measurement System; Dip Tube Water System; Weight Factor and Specific Gravity System; Instrument Air System; Vessel Liquid Level System; Vessel Liquid Transfer System; and Exhauster Differential Pressure Indicating Controller System. The tests will cover checks on equipment operation and electrical interlocks, but will not cover checks on associated annunciator alarms which are covered in a separate OTP

  9. Operability test procedure for the Rotary Mode Core Sampling System Exhausters 3 and 4

    International Nuclear Information System (INIS)

    WSaldo, E.J.

    1995-01-01

    This document provides a procedure for performing operability testing of the Rotary Mode Core Sampling System Exhausters 3 ampersand 4. Upon completion of testing activities an operability testing report will be issued

  10. Procedures and practices for day-to-day operation

    International Nuclear Information System (INIS)

    Distler, K.

    1986-01-01

    This lecture deals with problems of safe plant operation under day-to-day conditions. Operation, maintenance and surveillance have to be organized in a preventive manner. It will be shown that nearly all expected jobs and proceedings can be done rule-based. The connection of documentation and work preparation will be lined out. Moreover, the need for control and quality assurance for nearly all proceedings will be pointed out. The question of communication and scheduling will be touched. (orig.)

  11. Effective and efficient learning in the operating theater with intraoperative video-enhanced surgical procedure training

    NARCIS (Netherlands)

    van Det, M.J.; Meijerink, W.J.; Hoff, C.; Middel, B.; Pierie, J.P.

    INtraoperative Video Enhanced Surgical procedure Training (INVEST) is a new training method designed to improve the transition from basic skills training in a skills lab to procedural training in the operating theater. Traditionally, the master-apprentice model (MAM) is used for procedural training

  12. Procedures for the systematic appraisal of operational radiation protection programmes

    International Nuclear Information System (INIS)

    1987-09-01

    The purpose of this document is to give guidance to management and regulators of organisations using ionizing radiations on a technique for systematically appraising their operational radiation protection programme in order that its adequacy and effectiveness can be objectively determined. The appraisal technique is based on analytical trees and can be used to examine either a whole programme, to determine its completion and adequacy or to examine one component of a programme in considerable detail. This document will not develop technical recommendations on particular radiation protection programmes. These will be found in the appropriate Safety Series document on operational radiation protection. 8 refs, figs

  13. 76 FR 54528 - Standard Operating Procedures (SOP) of the Aircraft Certification Service (AIR) Process for the...

    Science.gov (United States)

    2011-09-01

    ...) of the Aircraft Certification Service (AIR) Process for the Sequencing of Certification and... on the Aircraft Certification Service (AIR) standard operating procedure (SOP) describing the process... comments on the SOP : AIR-100-001; Standard Operating Procedure--Aircraft Certification Service Project...

  14. 9 CFR 354.210 - Minimum standards for sanitation, facilities, and operating procedures in official plants.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Minimum standards for sanitation, facilities, and operating procedures in official plants. 354.210 Section 354.210 Animals and Animal Products... sanitation, facilities, and operating procedures in official plants. The provisions of §§ 354.210 to 354.247...

  15. The Pajarito Site operating procedures for the Los Alamos Critical Experiments Facility

    International Nuclear Information System (INIS)

    Malenfant, R.E.

    1991-12-01

    Operating procedures consistent with DOE Order 5480.6, and the American National Standard Safety Guide for the Performance of Critical Experiments are defined for the Los Alamos Critical Experiments Facility (LACEF) of the Los Alamos National Laboratory. These operating procedures supersede and update those previously published in 1983 and apply to any criticality experiment performed at the facility. 11 refs

  16. A toolkit for computerized operating procedure of complex industrial systems with IVI-COM technology

    International Nuclear Information System (INIS)

    Zhou Yangping; Dong Yujie; Huang Xiaojing; Ye Jingliang; Yoshikawa, Hidekazu

    2013-01-01

    A human interface toolkit is proposed to help the user develop computerized operating procedure of complex industrial system such as Nuclear Power Plants (NPPs). Coupled with a friendly graphical interface, this integrated tool includes a database, a procedure editor and a procedure executor. A three layer hierarchy is adopted to express the complexity of operating procedure, which includes mission, process and node. There are 10 kinds of node: entrance, exit, hint, manual input, detector, actuator, data treatment, branch, judgment and plug-in. The computerized operating procedure will sense and actuate the actual industrial systems with the interface based on IVI-COM (Interchangeable Virtual Instrumentation-Component Object Model) technology. A prototype system of this human interface toolkit has been applied to develop a simple computerized operating procedure for a simulated NPP. (author)

  17. A finite volume procedure for fluid flow, heat transfer and solid-body stress analysis

    KAUST Repository

    Jagad, P. I.

    2018-04-12

    A unified cell-centered unstructured mesh finite volume procedure is presented for fluid flow, heat transfer and solid-body stress analysis. An in-house procedure (A. W. Date, Solution of Transport Equations on Unstructured Meshes with Cell-Centered Colocated Variables. Part I: Discretization, International Journal of Heat and Mass Transfer, vol. 48 (6), 1117-1127, 2005) is extended to include the solid-body stress analysis. The transport terms for a cell-face are evaluated in a structured grid-like manner. The Cartesian gradients at the center of each cell-face are evaluated using the coordinate transformation relations. The accuracy of the procedure is demonstrated by solving several benchmark problems involving different boundary conditions, source terms, and types of loading.

  18. The impact of surgeon volume on colostomy reversal outcomes after Hartmann's procedure for diverticulitis.

    Science.gov (United States)

    Aquina, Christopher T; Probst, Christian P; Becerra, Adan Z; Hensley, Bradley J; Iannuzzi, James C; Noyes, Katia; Monson, John R T; Fleming, Fergal J

    2016-11-01

    Colostomy reversal after Hartmann's procedure for diverticulitis is a morbid procedure, and studies investigating factors associated with outcomes are lacking. This study identifies patient, surgeon, and hospital-level factors associated with perioperative outcomes after stoma reversal. The Statewide Planning and Research Cooperative System was queried for urgent/emergency Hartmann's procedures for diverticulitis between 2000-2012 in New York State and subsequent colostomy reversal within 1 year of the procedure. Surgeon and hospital volume were categorized into tertiles based on the annual number of colorectal resections performed each year. Bivariate and mixed-effects analyses were used to assess the association between patient, surgeon, and hospital-level factors and perioperative outcomes after colostomy reversal, including a laparoscopic approach; duration of stay; intensive care unit admission; complications; mortality; and 30-day, unscheduled readmission. Among 10,487 patients who underwent Hartmann's procedure and survived to discharge, 63% had the colostomy reversed within 1 year. After controlling for patient, surgeon, and hospital-level factors, high-volume surgeons (≥40 colorectal resections/yr) were independently associated with higher odds of a laparoscopic approach (unadjusted rates: 14% vs 7.6%; adjusted odds ratio = 1.84, 95% confidence interval = 1.12, 3.00), shorter duration of stay (median: 6 versus 7 days; adjusted incidence rate ratio = 0.87, 95% confidence interval = 0.81, 0.95), and lower odds of 90-day mortality (unadjusted rates: 0.4% vs 1.0%; adjusted odds ratio = 0.30, 95% confidence interval = 0.10, 0.88) compared with low-volume surgeons (1-15 colorectal resections/yr). High-volume surgeons are associated with better perioperative outcomes and lower health care utilization after Hartmann's reversal for diverticulitis. These findings support referral to high-volume surgeons for colostomy reversal. Copyright © 2016

  19. 40 CFR 240.208-3 - Recommended procedures: Operations.

    Science.gov (United States)

    2010-07-01

    ... the quality of the bottom ash at least twice per shift and record in the operating log the estimated percentage of unburned combustibles. (b) If residue or fly ash is collected in a wet condition, it should be drained of free moisture. Transportation of residue and fly ash should be by means that prevent the loads...

  20. 21 CFR 58.81 - Standard operating procedures.

    Science.gov (United States)

    2010-04-01

    ...) Data handling, storage, and retrieval. (11) Maintenance and calibration of equipment. (12) Transfer... LABORATORY PRACTICE FOR NONCLINICAL LABORATORY STUDIES Testing Facilities Operation § 58.81 Standard... forth nonclinical laboratory study methods that management is satisfied are adequate to insure the...

  1. Numerical simulation of the transient thermal-hydraulic behaviour of the ITER blanket cooling system under the draining operational procedure

    Energy Technology Data Exchange (ETDEWEB)

    Di Maio, P.A. [Dipartimento di Energia, Ingegneria dell’Informazione e Modelli Matematici, Università di Palermo Viale delle Scienze, 90128 Palermo (Italy); Dell’Orco, G.; Furmanek, A. [ITER Organization, Route de Vinon-sur-Verdon, CS 90 046, 13067 St Paul Lez Durance Cedex (France); Garitta, S. [Dipartimento di Energia, Ingegneria dell’Informazione e Modelli Matematici, Università di Palermo Viale delle Scienze, 90128 Palermo (Italy); Merola, M.; Mitteau, R.; Raffray, R. [ITER Organization, Route de Vinon-sur-Verdon, CS 90 046, 13067 St Paul Lez Durance Cedex (France); Spagnuolo, G.A. [Dipartimento di Energia, Ingegneria dell’Informazione e Modelli Matematici, Università di Palermo Viale delle Scienze, 90128 Palermo (Italy); Vallone, E., E-mail: eug.vallone@gmail.com [Dipartimento di Energia, Ingegneria dell’Informazione e Modelli Matematici, Università di Palermo Viale delle Scienze, 90128 Palermo (Italy)

    2015-10-15

    Highlights: • ITER blanket cooling system hydraulic behaviour is studied under draining transient. • A computational approach based on the finite volume method has been followed. • Draining efficiency has been assessed in term of transient duration and residual water. • Transient duration ranges from ∼40 to 50 s, under the reference draining scenario. • Residual water is predicted to range from few tens of gram up to few kilograms. - Abstract: Within the framework of the research and development activities supported by the ITER Organization on the blanket system issues, an intense analysis campaign has been performed at the University of Palermo with the aim to investigate the thermal-hydraulic behaviour of the cooling system of a standard 20° sector of ITER blanket during the draining transient operational procedure. The analysis has been carried out following a theoretical-computational approach based on the finite volume method and adopting the RELAP5 system code. In a first phase, attention has been focused on the development and validation of the finite volume models of the cooling circuits of the most demanding modules belonging to the standard blanket sector. In later phase, attention has been put to the numerical simulation of the thermal-hydraulic transient behaviour of each cooling circuit during the draining operational procedure. The draining procedure efficiency has been assessed in terms of both transient duration and residual amount of coolant inside the circuit, observing that the former ranges typically between 40 and 120 s and the latter reaches at most ∼8 kg, in the case of the cooling circuit of twinned modules #6–7. Potential variations to operational parameters and/or to circuit lay-out have been proposed and investigated to optimize the circuit draining performances. In this paper, the set-up of the finite volume models is briefly described and the key results are summarized and critically discussed.

  2. Effective and efficient learning in the operating theater with intraoperative video-enhanced surgical procedure training

    OpenAIRE

    van Det, M.J.; Meijerink, W.J.; Hoff, C.; Middel, B.; Pierie, J.P.

    2013-01-01

    INtraoperative Video Enhanced Surgical procedure Training (INVEST) is a new training method designed to improve the transition from basic skills training in a skills lab to procedural training in the operating theater. Traditionally, the master-apprentice model (MAM) is used for procedural training in the operating theater, but this model lacks uniformity and efficiency at the beginning of the learning curve. This study was designed to investigate the effectiveness and efficiency of INVEST co...

  3. Optimisation of Forensic Genetics Procedures Used in Disputed Paternity Testing: Adjustment of the PCR Reaction Volume

    Directory of Open Access Journals (Sweden)

    Damir Marjanović

    2006-05-01

    Full Text Available Standard molecular techniques, with only a slight modification, are very useful in obtaining and interpreting the final results in the field of forensic genetic. Data obtained through such analysis are highly reliable and can be used as a very powerful tool that produces valuable results. However, success and swiftness of DNA typing of biological evidence either that found at a crime scene or used in disputed paternity testing, depends on the optimization of numerous factors. One of the most important and critical phases that ensures reliability of the whole procedure is the choice of the most suitable volume for the amplification protocol. Buccal swabs were collected from volunteers. DNA was extracted by Qiagen Dnaeasy Tissue Kit. PowerPlex 16 kit was used to simultaneously amplify 15 STR loci by PCR. Amplification was carried out as described previously. The tested total working reaction volumes were 5, 10 and 25 microl. The PCR amplification was carried out in PE Gene Amp PCR System Thermal Cycler (ABI, Foster City, CA. Amplification products were analyzed on an ABI PRISM 377 instrument (ABI, Foster City, CA in 5% bis-acrilamide gel. Amplification was generally successful for all the tested reaction volumes. Lower partial to complete DNA profiles ratio, the quality of obtained STR profiles, significantly reduced amount of reaction's components give advantage to 5 microl reaction volume over other two tested volumes in this case.

  4. Procedure for operating a heavy water cooled power reactor

    International Nuclear Information System (INIS)

    Rau, P.; Kumpf, H.

    1981-01-01

    Nuclear reactors cooled by heavy water usually have equipment for fuel element exchange during operation, with the primary circuit remaining contained. This fuel element exchange equipment is expensive and complicated in many respects. According to the invention, the heavy water is therefore replaced by light water after a certain time of operation in such way that light water is led in and heavy water is led off. After the replacement, at least a quarter of the fuel elements of the reactor core is exchanged with the reactor pressure vessel being open. Then the light water serving as a shielding is replaced by heavy water, with the reactor pressure vessel being closed. The invention is of interest particularly for high-conversion reactors. (orig.) [de

  5. Study of operating procedures in nuclear power plants: Practices and problems

    International Nuclear Information System (INIS)

    Morgenstern, M.H.; Barnes, V.E.; McGuire, M.V.; Radford, L.R.; Wheeler, W.A.

    1987-02-01

    This report describes the project activities, findings, and recommendations of a project entitled ''Program Plan for Assessing and Upgrading Operating Procedures for Nuclear Power Plants.'' The project was performed by the Pacific Northwest Laboratory and Battelle Human Affairs Research Centers for the Division of Human Factors Technology, Office of Nuclear Reactor Regulation, US Nuclear Regulatory Commission (NRC). The project team analyzed and evaluated samples of normal and abnormal operating procedures from 31 commercial nuclear power plant sites operating in the United States. The project team also visited nine nuclear power plants in the United States to obtain information on the development, use, and control of operating procedures. A peer review group was convened to advise the project team on the conduct of the project and to review and comment on the project report. The report contains findings on the usability of operating procedures and on practices concerning the development, use, an control of operating procedures in nuclear power plants. The report includes recommendations to the NRC on the need to upgrade the quality of operating procedures. The report also discusses an approach to a program plan to assess and upgrade operating procedures

  6. Operability test procedure for TRUSAF assayer software upgrade

    International Nuclear Information System (INIS)

    Cejka, C.C.

    1995-01-01

    This OTP is to be used to ensure the operability of the Transuranic Waste Assay System (TRUWAS). The system was upgraded and requires a retest to assure satisfactory operation. The upgrade consists of an AST 486 computer to replace the IBM-PC/XT, and a software upgrade (CNEUT). The software calculations are performed in the same manner as in the previous system (NEUT), however, the new software is written in C Assembly Language. CNEUT is easier to use and far more powerful than the previous program. The TRUWAS is used to verify the TRU content of waste packages sent for storage in the Transuranic Storage and Assay Facility (TRUSAF). The TRUSAF is part of Westinghouse Hanford's certification program for waste to be shipped to the Waste Isolation Pilot Plant (WIPP) in New Mexico. The Transuranic Waste Assayer uses a combination passive-active neutron interrogation system to determine the TRU content of 55-gallon waste drums. The system consists of a shielded assay chamber; Deuterium-Tritium neutron generator; Helium-3 proportional counters; drum handling system; electronics including preamplifier, amplifier, and discriminator for each of the counter packages; and an AST 486 computer/printer system for data acquisition and analysis. The system can detect down to TRU levels of 10 nCi/g in the waste matrix. The equipment to be tested is: Assay Chamber Door Drum Turntable and Automatic Loading Platform Interlocks Assayer Software; and IBM computer/printer software. The objective of the test is to verify that the system is operational with the AST 486 computer, the software used in the new computer system correctly calculates TRU levels, and the new computer system is capable of storing and retrieving data

  7. Guidelines for the presentation of emergency operating procedures using advanced information technology

    International Nuclear Information System (INIS)

    Green, M.; Hollnagel, E.; Niwa, Yuji

    1994-01-01

    New methods of information presentation and interface design are changing the conditions for work in the modern NPP control room. One area receiving considerable attention is that of Emergency Operating Procedures (EOP). Conventionally such procedures are presented using hard copy manuals; however, development in IT means that there are new opportunities for the computerization of such procedures. This paper reports on the development of human factors guidelines for the computerized presentation of EOPs. After identifying the principle stages in the transition from procedures as documents to fully automated procedures, computerised procedure presentation is briefly discussed. Guidelines for the presentation of such procedures are outlined starting with the high level goals for guidelines themselves. Such goals also constitute the criteria against which the computerized procedures are measured during implementation. Six dimensions describing computerized procedure presentation are presented and two are explore in more detail by identifying points along each dimension that characterize different levels of IT sophistication. (author). 8 refs, 1 tab

  8. In-situ burn operational procedures development exercises

    International Nuclear Information System (INIS)

    Bitting, K.; Gynther, J.; Drieu, M.; Tidemann, A.; Martin, R.

    2001-01-01

    The United States Coast Guard, the Texas General Land Office and the National Response Corporation conducted three at-sea oil spill exercises in 1999 and 2000 to test and evaluate a variety of methods to perform in-situ burning (ISB) operations at sea. ISB is seldom used during actual responses, particularly in offshore environments because there is no detailed ISB operation plan for specific regional response teams. There is also a lack of sufficient ISB resources, both equipment and trained personnel, that can be mobilized within the limited ISB window-of-opportunity. There is also a misconception regarding the costs and benefits of ISB. For these exercises, the oil slick was simulated with several tons of oranges. The primary objective was to examine the safe, effective and efficient implementation of ISB. The exercises involved the use of actual response vessels, water-cooled fire booms, helicopters and helitorches. Specific manoeuvres were conducted and particular activities were measured. The experimental data was recorded for future use as a planning and training tool. The exercises demonstrated that ISB is a viable and efficient response tool if it is used in the right situation. The biggest short fall of these exercises was the inability to burn real oil on the water (the oranges did not provide enough data). It was concluded that ISB is not always the best tool for every situation. Dispersants and mechanical recovery are also viable options. 1 tab., 6 figs

  9. Operative fixation of chest wall fractures: an underused procedure?

    Science.gov (United States)

    Richardson, J David; Franklin, Glen A; Heffley, Susan; Seligson, David

    2007-06-01

    Chest wall fractures, including injuries to the ribs and sternum, usually heal spontaneously without specific treatment. However, a small subset of patients have fractures that produce overlying bone fragments that may produce severe pain, respiratory compromise, and, if untreated mechanically, result in nonunion. We performed open reduction and internal fixation on seven patients with multiple rib fractures-five in the initial hospitalization and two delayed--as well as 35 sternal fractures (19 immediate fixation and 16 delayed). Operative fixation was accomplished using titanium plates and screws in both groups of patients. All patients with rib fractures did well; there were no major complications or infections, and no plates required removal. Clinical results were excellent. There was one death in the sternal fracture group in a patient who was ventilator-dependent preoperatively and extubated himself in the early postoperative period. Otherwise, the results were excellent, with no complications occurring in this group. Three patients had their plates removed after boney union was achieved. No evidence of infection or nonunion occurred. The excellent results achieved in the subset of patients with severe chest wall deformities treated initially at our institution and those referred from outside suggest that operative fixation is a useful modality that is likely underused.

  10. Manpower development for safe operation of nuclear power plant. China. Emergency operating procedures. Activity: 5.1.4-Task-11. Technical report

    International Nuclear Information System (INIS)

    Walsh, L.A.

    1994-01-01

    This report covers the period of engagement from July 11, 1994 through July 22, 1994. The events and topics of discussion are as follows: History of Emergency Operating Procedure EOP Development; Emergency Operating Procedures (Event Based, Critical Safe Function Status Trees and Functional Recovery Response Procedures); Transition from Emergency Operating Procedures to Severe Accident Management Guidelines

  11. Project W-320, operational test procedure OTP-320-003 test report

    International Nuclear Information System (INIS)

    Bevins, R.R.

    1998-01-01

    This report documents and summarizes the results of OTP-320-003 Project W-320 Operational Testing of the WRSS Supernate Transfer System. Project W-320 Operational Test OTP-320-003 was performed to verify components of the Waste Retrieval Sluicing System (WRSS) supernate transfer system functioned as designed following construction completion and turnover to operations. All equipment operation was performed by Tank Farms Operations personnel following the operational test procedure and referenced operating procedures. Supernate Transfer line Flushing System Testing was completed over the course of approximately 4 weeks as tank farm conditions and configuration, equipment availability, and operations resources allowed. All testing was performed with the 702-AZ ventilation system and the 296-P-16 ventilation systems in operation. Test procedure OTP-320-003 required two revisions during testing to incorporate Procedure Changes Authorizations (PCAs) necessary to facilitate testing. Various sections of testing are documented on each procedure revision. The completed test procedure is included as Attachment A. Exception Reports generated during the course of testing are included as Attachment B

  12. 50 CFR 260.103 - Operations and operating procedures shall be in accordance with an effective sanitation program.

    Science.gov (United States)

    2010-10-01

    ... be in accordance with an effective sanitation program. 260.103 Section 260.103 Wildlife and Fisheries... Operations and operating procedures shall be in accordance with an effective sanitation program. (a) All..., choppers, and containers which fail to meet appropriate and adequate sanitation requirements will be...

  13. Procedures for self-assessment of operational safety

    International Nuclear Information System (INIS)

    1997-08-01

    Self-assessment processes have been continuously developed by nuclear organizations, including nuclear power plants. Currently, the nuclear industry and governmental organizations are showing an increasing interest in the implementation of this process as an effective way for improving safety performance. Self-assessment involves the use of different types of tools and mechanisms to assist the organizations in assessing their own safety performance against given standards. This helps to enhance the understanding of the need for improvements, the feeling of ownership in achieving them and and the safety culture as a whole. The concepts developed in this report present the basic approach to self-assessment taking into consideration experience gained during Operational Safety Review Team (OSART) missions, from organizations and utilities which have successfully implemented parts of a self-assessment programme and from meetings organized to discuss the subject

  14. Point-to-Point! Validation of the Small Aircraft Transportation System Higher Volume Operations Concept

    Science.gov (United States)

    Williams, Daniel M.

    2006-01-01

    Described is the research process that NASA researchers used to validate the Small Aircraft Transportation System (SATS) Higher Volume Operations (HVO) concept. The four phase building-block validation and verification process included multiple elements ranging from formal analysis of HVO procedures to flight test, to full-system architecture prototype that was successfully shown to the public at the June 2005 SATS Technical Demonstration in Danville, VA. Presented are significant results of each of the four research phases that extend early results presented at ICAS 2004. HVO study results have been incorporated into the development of the Next Generation Air Transportation System (NGATS) vision and offer a validated concept to provide a significant portion of the 3X capacity improvement sought after in the United States National Airspace System (NAS).

  15. Electric power annual 1994. Volume 2, Operational and financial data

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-28

    This year, the annual is published in two volumes. Volume I focused on US electric utilities and contained final 1994 data on net generation, fossil fuel consumption, stocks, receipts, and cost. This Volume II presents annual 1994 summary statistics for the electric power industry, including information on both electric utilities and nonutility power producers. Included are preliminary data for electric utility retail sales of electricity, associated revenue, and average revenue per kilowatthour of electricity sold (based on form EIA-861) and for electric utility financial statistics, environmental statistics, power transactions, and demand- side management. Final 1994 data for US nonutility power producers on installed capacity and gross generation, as well as supply and disposition information, are also provided in Volume II. Technical notes and a glossary are included.

  16. Load research manual. Volume 2. Fundamentals of implementing load research procedures

    Energy Technology Data Exchange (ETDEWEB)

    Brandenburg, L.; Clarkson, G.; Grund, Jr., C.; Leo, J.; Asbury, J.; Brandon-Brown, F.; Derderian, H.; Mueller, R.; Swaroop, R.

    1980-11-01

    This three-volume manual presents technical guidelines for electric utility load research. Special attention is given to issues raised by the load data reporting requirements of the Public Utility Regulatory Policies Act of 1978 and to problems faced by smaller utilities that are initiating load research programs. In Volumes 1 and 2, procedures are suggested for determining data requirements for load research, establishing the size and customer composition of a load survey sample, selecting and using equipment to record customer electricity usage, processing data tapes from the recording equipment, and analyzing the data. Statistical techniques used in customer sampling are discussed in detail. The costs of load research also are estimated, and ongoing load research programs at three utilities are described. The manual includes guides to load research literature and glossaries of load research and statistical terms.

  17. Stereolithographic volume evaluation of healing and shaping after rhinoplasty operations.

    Science.gov (United States)

    Tatlidede, Soner; Turgut, Gürsel; Gönen, Emre; Kayali, Mahmut Ulvi; Baş, Lütfü

    2009-07-01

    Nasal edema and volume changes are unavoidable processes during the healing period after rhinoplasty. Various applications were reported regarding the prevention of early edema; however, the literature shows no study focused on the course of the nasal edema and volume changes up-to-date. We aimed to study the nasal volume changes during the first year of postoperative healing period and to form a recovery and volume change diagram with the obtained data. We prepared standard frames and nasal molds of 7 rhinoplasty patients at regular time intervals (preoperative period and at the postoperative 1st, 2nd, 4th, 8th, 12th, 24th, and 52nd weeks). Plaster nasal models were created by using these molds. Volumes of models were measured by computed tomographic scanning and three-dimensional image processing programs. According to our results, the nasal edema reaches its maximum level at the postoperative fourth week and then rapidly decreases until its minimum level at the eighth week. In contrast with the general opinion, the nasal volume begins to increase smoothly reaching to a level minimally below the preoperative value by the end of the first year.

  18. Experimental studies of computerized procedures and team size in nuclear power plant operations

    International Nuclear Information System (INIS)

    Huang, F.-H.; Hwang, S.-L.

    2009-01-01

    The operation of a nuclear power plant is so complex that it requires teamwork. To support team performance, a system need to provide all team members integrated information displays as well as decision aids (e.g., computerized procedures). Two experiments were conducted to investigate the effects of computerized procedures and team size on operating performance. Forty-five participants were involved in the experiments. Each participant executed decision and action tasks to deal with alarm signals, while detecting occasional system errors in the interface. Results showed that effects of computerized procedures were significant on various performance indicators, such as operation time, operation errors, and learning effect, and that two operators would be a satisfactory size in the teamwork system providing computerized procedures

  19. Development of a VR training system of robotic peroral operation procedure for endoscopic surgery of digestive tracts

    International Nuclear Information System (INIS)

    Suzuki, Naoki; Hattori, Asaki; Tanoue, Kazuo; Ieiri, Satoshi; Konishi, Kozo; Tomikawa, Morimasa; Kenmotsu, Hajime; Hashizume, Makoto

    2010-01-01

    This report presents the development of a VR (virtual real) training system of robotic peroral operation procedure for endoscopic resection of gastric mucosa as the training is essential because the procedure differs from usual one hitherto. For VR operation space, used is reporters' sphere-filled organ model (SFM), which is deformed by and repels to, the outside force as a soft tissue rapidly in the real time. The deformation and repellence are computable. The SFM space is reconstructed to 3D of the inner environment of stomach using MRI data. The endoscope has, at the right and left side of its top, 2 arms of inner needle knife-equipped robotic forceps and is inserted perorally for operation. In VR, the forceps can grab the gastric mucosa, cut it with the knife to complete resection and carry the specimen out of the body. For the procedure training, the time required for hemostasis, bleeding volume, trace of the arms, intensity and direction of the outer force given are recorded, with which trainee's safety and degree of skill are evaluable in VR. Hydration step and clipping to close the wound are to be further added in the procedure. (T.T.)

  20. Intra-operative removal of chest tube in video-assisted thoracoscopic procedures

    Directory of Open Access Journals (Sweden)

    Moustafa M. El-Badry

    2017-12-01

    Conclusions: Intra-operative removal of chest tube during VATS procedures was a safe technique in well selected patients with an intra-operative successful air-leak test with radiological and clinical follow-up. This technique provided lesser post-operative pain with shorter hospital stay.

  1. 49 CFR 195.402 - Procedural manual for operations, maintenance, and emergencies.

    Science.gov (United States)

    2010-10-01

    ... operating conditions by monitoring pressure, temperature, flow or other appropriate operational data and...) Minimization of public exposure to injury and probability of accidental ignition by assisting with evacuation... SAFETY TRANSPORTATION OF HAZARDOUS LIQUIDS BY PIPELINE Operation and Maintenance § 195.402 Procedural...

  2. Use of Minicameras to Improve Operative Procedure in Security Forces.

    Science.gov (United States)

    Clemente-Suárez, Vicente Javier; Diaz-Manzano, Montaña; Robles-Pérez, José Juan

    2017-09-01

    The aim of the present study was to analyze pistol and compact rifle marksmanship in close quarter combat (CQC). There is currently a controversy about what weapon is most appropriate to use in CQC, short weapon as pistols or long weapons as rifle. Forty two participants conducted two close quarter combat simulations, one with pistol and one with compact rifle. Marksmanship and time to cover the simulation were measured. Data obtained showed no significant differences between pistol and compact rifle. In addition, it was observed a tendency to obtain higher scores with compact rifle, probably be due to the higher stability provided in the shot action. Compact rifle could be an effective election in actual theaters of operation in which asymmetrical and symmetrical combat are combined and also in police interventions due to compact rifle provide higher fire power and range and obtained the same shooting performance than pistol. To the best of our knowledge this is the first study that provides empirical data to solve the discussion about the efficiency of the use of rifle and pistol in close quarter combat in military and police interventions. These results could be used to improve the military and police interventions efficiency.

  3. Radiation dose to procedural personnel and patients from an X-ray volume imaging system

    International Nuclear Information System (INIS)

    Paul, Jijo; Mbalisike, Emmanuel C.; Vogl, Thomas J.

    2013-01-01

    To evaluate the radiation dose received by procedural personnel and patients from an X-ray volume imaging (XVI) system during interventional procedures. Forty patients were examined using catheter angiography (group A), digital subtraction angiography (group B) and cone-beam CT (CBCT, group C). Doses to procedural personnel (using thermo-luminescent dosimeters, TLDs) and patients were estimated. Image quality and lesion delineation were assessed using objective and subjective methods. Shapiro-Wilk, two-sided Student's t and Wilcoxon matched-pairs tests were used to test statistical significance. Doses (milligrays) measured in the hands and left knee of the interventionist were higher than those in an assistant physician (P < 0.05). Doses (dose-area product and skin entry dose) were lower in group A and higher in C compared with other groups; moreover, comparison among the groups were significant (all P = 0.0001). Subjective and objective lesion delineation showed significant results (all P < 0.05) among the tumour types considered. Image quality estimation showed the opposite results for objective and subjective analysis. More doses were obtained for hands of the procedural personnel compared to other anatomical regions measured. Catheter angiography showed lower dose compared with other imaging groups examined. Lesion delineation was clearly possible using CBCT. Objective and subjective analysis showed the opposite results regarding image quality because of higher noise levels and artefacts. (orig.)

  4. Hand washing in operating room: a procedural comparison

    Directory of Open Access Journals (Sweden)

    Alessia Stilo

    2016-09-01

    Full Text Available BACKGROUND Hand washing has been considered a measure of personal hygiene for centuries and it is known that an improper hand hygiene by healthcare workers is responsible for about 40% of nosocomial infections. Therefore, surgical hand preparation is a critical element for healthcare safety in order to reduce microbial contamination of  surgical wound in case of non detected break of the gloves. The aim of our study is to evaluate the efficacy three antiseptics: Povi-iodine scrub; EPG (Ethanol, Hydrogen Peroxide, Glycerol, recommended by WHO, and common marseille soap type in a liquid formulation. METHODS It was designed a randomized, double-blind, single-center study conducted in the University Hospital of Messina, from January to June 2013. We asked operators to put the fingertips of their right hand (if not left-handed for one minute on the PCA medium, before washing with the three types of antiseptics, and after washing and drying. Drying was made using sterile gauzes or disposable wipes. Then, we measured the number of colony forming units per mL (CFU/mL and calculated the percentage of microbial load reduction. RESULTS 211 samples have been considered for statistical analysis: in 42 samples, in fact, initial microbial load was lower than after washing. Washing with EPG reduced CFU/ml from  a mean of 38,9 to 4,1 (86,5% reduction, washing with povi-iodine scrub from 59,55 to 12,9 (75,9% reduction and washing with Marseille soap from 47,26 to 12,7 (64,3% reduction. CONCLUSIONS Our study shows that washing with EPG has superior efficacy in CFU reduction. Antiseptic hand washing, however, cannot be considered the only measure to reduce infections: the anomaly of some results (initial microbial load lower than after washing  demonstrates that drying is an essential phase in the presurgical preparation. Therefore, hand hygiene must be part of a more complex strategy of surveillance and control of nosocomial infections

  5. Procedure for generating steam and steam generator for operating said procedure

    International Nuclear Information System (INIS)

    Chlique, Bernard.

    1975-01-01

    This invention concerns the generation of steam by bringing the water to be vaporised into indirect thermal exchange relation with the heating steam which condenses when passing in series, along alternate routes, through bundles of tubes immersed in a vaporising chamber. A number of steam generators working on this principle already exist. The purpose of the invention is to modify the operating method of these steam generators by means of a special disposition making it possible to build a compact unit including an additional bundle of tubes heated by the condensates collected at the outlet of each bundle through which the heating steam passes [fr

  6. Initial 12-h operative fluid volume is an independent risk factor for pleural effusion after hepatectomy.

    Science.gov (United States)

    Cheng, Xiang; Wu, Jia-Wei; Sun, Ping; Song, Zi-Fang; Zheng, Qi-Chang

    2016-12-01

    Pleural effusion after hepatectomy is associated with significant morbidity and prolonged hospital stays. Several studies have addressed the risk factors for postoperative pleural effusion. However, there are no researches concerning the role of the initial 12-h operative fluid volume. The aim of this study was to evaluate whether the initial 12-h operative fluid volume during liver resection is an independent risk factor for pleural effusion after hepatectomy. In this study, we retrospectively analyzed clinical data of 470 patients consecutively undergoing elective hepatectomy between January 2011 and December 2012. We prospectively collected and retrospectively analyzed baseline and clinical data, including preoperative, intraoperative, and postoperative variables. Univariate and multivariate analyses were carried out to identify whether the initial 12-h operative fluid volume was an independent risk factor for pleural effusion after hepatectomy. The multivariate analysis identified 2 independent risk factors for pleural effusion: operative time [odds ratio (OR)=10.2] and initial 12-h operative fluid volume (OR=1.0003). Threshold effect analyses revealed that the initial 12 h operative fluid volume was positively correlated with the incidence of pleural effusion when the initial 12-h operative fluid volume exceeded 4636 mL. We conclude that the initial 12-h operative fluid volume during liver resection and operative time are independent risk factors for pleural effusion after hepatectomy. Perioperative intravenous fluids should be restricted properly.

  7. Soil washing physical separations test procedure - 300-FF-1 operable unit

    Energy Technology Data Exchange (ETDEWEB)

    Belden, R.D.

    1993-10-08

    This procedure provides the operations approach, a field sampling plan, and laboratory procedures for a soil washing test to be conducted by Alternative Remedial Technologies, Inc. (ART) in the 300-FF-1 area at the Hanford site. The {open_quotes}Quality Assurance Project Plan for the Soil Washing Physical Separations Test, 300-FF-1 Operable Unit,{close_quotes} Hanford, Washington, Alternative Remedial Technologies, Inc., February 1994 (QAPP) is provided in a separate document that presents the procedural and organizational guidelines for this test. This document describes specifications, responsibilities, and general procedures to be followed to conduct physical separation soil treatability tests in the North Process Pond of the 300-FF-1 Operable Unit (OU) at the Hanford Site. These procedures are based on the {open_quotes}300-FF-1 Physical Separations CERCLA Treatability Test Plan, DOE/RL 92-2l,{close_quotes} (DOE-RL 1993).

  8. Soil washing physical separations test procedure - 300-FF-1 operable unit

    International Nuclear Information System (INIS)

    Belden, R.D.

    1993-01-01

    This procedure provides the operations approach, a field sampling plan, and laboratory procedures for a soil washing test to be conducted by Alternative Remedial Technologies, Inc. (ART) in the 300-FF-1 area at the Hanford site. The open-quotes Quality Assurance Project Plan for the Soil Washing Physical Separations Test, 300-FF-1 Operable Unit,close quotes Hanford, Washington, Alternative Remedial Technologies, Inc., February 1994 (QAPP) is provided in a separate document that presents the procedural and organizational guidelines for this test. This document describes specifications, responsibilities, and general procedures to be followed to conduct physical separation soil treatability tests in the North Process Pond of the 300-FF-1 Operable Unit (OU) at the Hanford Site. These procedures are based on the open-quotes 300-FF-1 Physical Separations CERCLA Treatability Test Plan, DOE/RL 92-2l,close quotes (DOE-RL 1993)

  9. Safety Precautions and Operating Procedures in an (A)BSL-4 Laboratory: 4. Medical Imaging Procedures.

    Science.gov (United States)

    Byrum, Russell; Keith, Lauren; Bartos, Christopher; St Claire, Marisa; Lackemeyer, Matthew G; Holbrook, Michael R; Janosko, Krisztina; Barr, Jason; Pusl, Daniela; Bollinger, Laura; Wada, Jiro; Coe, Linda; Hensley, Lisa E; Jahrling, Peter B; Kuhn, Jens H; Lentz, Margaret R

    2016-10-03

    Medical imaging using animal models for human diseases has been utilized for decades; however, until recently, medical imaging of diseases induced by high-consequence pathogens has not been possible. In 2014, the National Institutes of Health, National Institute of Allergy and Infectious Diseases, Integrated Research Facility at Fort Detrick opened an Animal Biosafety Level 4 (ABSL-4) facility to assess the clinical course and pathology of infectious diseases in experimentally infected animals. Multiple imaging modalities including computed tomography (CT), magnetic resonance imaging, positron emission tomography, and single photon emission computed tomography are available to researchers for these evaluations. The focus of this article is to describe the workflow for safely obtaining a CT image of a live guinea pig in an ABSL-4 facility. These procedures include animal handling, anesthesia, and preparing and monitoring the animal until recovery from sedation. We will also discuss preparing the imaging equipment, performing quality checks, communication methods from "hot side" (containing pathogens) to "cold side," and moving the animal from the holding room to the imaging suite.

  10. Situation awareness and trust in computer-based procedures in nuclear power plant operations

    Energy Technology Data Exchange (ETDEWEB)

    Throneburg, E. B.; Jones, J. M. [AREVA NP Inc., 7207 IBM Drive, Charlotte, NC 28262 (United States)

    2006-07-01

    Situation awareness and trust are two issues that need to be addressed in the design of computer-based procedures for nuclear power plants. Situation awareness, in relation to computer-based procedures, concerns the operators' knowledge of the plant's state while following the procedures. Trust concerns the amount of faith that the operators put into the automated procedures, which can affect situation awareness. This paper first discusses the advantages and disadvantages of computer-based procedures. It then discusses the known aspects of situation awareness and trust as applied to computer-based procedures in nuclear power plants. An outline of a proposed experiment is then presented that includes methods of measuring situation awareness and trust so that these aspects can be analyzed for further study. (authors)

  11. Design of test and emergency procedures to improve operator behaviour in French nuclear power plants

    International Nuclear Information System (INIS)

    Griffon-Fouco, M.; Gomolinski, M.

    1982-09-01

    The incident analyses performed in French nuclear power plants high-lighted that deficiencies in the design of procedures are frequent causes of human errors. The process for developing new guidelines for the writing of test and emergency procedures is presented: this process is based on operators interviews and observations at the plants or at simulators. The main principles for the writing of procedures are developed. For example: - the elaboration of a procedure for action and of a separate educational procedure, - the coordination of crew responses, - the choice of vocabulary, graphs, flow charts and so on as regards the format. Other complementary actions, such as the training of operators in the use of procedures, are described

  12. Design of test and emergency procedures to improve operator behavior in French nuclear power plants

    International Nuclear Information System (INIS)

    Griffon-Fouco, M.; Gomolinski, M.

    1983-01-01

    The incident analyses performed in French nuclear power plants high-lighted that deficiencies in the design of procedures are frequent causes of human errors. The process for developing new guidelines for the writing of test and emergency procedures is presented: this process is based on operators interviews and observations at the plants or at simulators. The main principles for the writing of procedures are developed. For example: the elaboration of a procedure for action and of separate educational procedure; the coordination of crew responses; and the choice of vocabulary, graphs, flow charts and so on as regards the format. Other complementary actions, such as the training of operators in the use of procedures, are described

  13. Situation awareness and trust in computer-based procedures in nuclear power plant operations

    International Nuclear Information System (INIS)

    Throneburg, E. B.; Jones, J. M.

    2006-01-01

    Situation awareness and trust are two issues that need to be addressed in the design of computer-based procedures for nuclear power plants. Situation awareness, in relation to computer-based procedures, concerns the operators' knowledge of the plant's state while following the procedures. Trust concerns the amount of faith that the operators put into the automated procedures, which can affect situation awareness. This paper first discusses the advantages and disadvantages of computer-based procedures. It then discusses the known aspects of situation awareness and trust as applied to computer-based procedures in nuclear power plants. An outline of a proposed experiment is then presented that includes methods of measuring situation awareness and trust so that these aspects can be analyzed for further study. (authors)

  14. Turnaround operations analysis for OTV. Volume 2: Detailed technical report

    Science.gov (United States)

    1988-01-01

    The objectives and accomplishments were to adapt and apply the newly created database of Shuttle/Centaur ground operations. Previously defined turnaround operations analyses were to be updated for ground-based OTVs (GBOTVs) and space-based OTVs (SBOTVs), design requirements identified for both OTV and Space Station accommodations hardware, turnaround operations costs estimated, and a technology development plan generated to develop the required capabilities. Technical and programmatic data were provided for NASA pertinent to OTV round and space operations requirements, turnaround operations, task descriptions, timelines and manpower requirements, OTV modular design and booster and Space Station interface requirements. SBOTV accommodations development schedule, cost and turnaround operations requirements, and a technology development plan for ground and space operations and space-based accommodations facilities and support equipment. Significant conclusion are discussed.

  15. The licensing procedure for construction and operation of nuclear power plants

    International Nuclear Information System (INIS)

    Salvatore, J.E.L.

    1980-03-01

    The licensing procedure for the construction and operation of the nuclear power plants in Brazil is analysed, according to the International Atomic Energy Agency orientation. The risks related to the nuclear energy is also emphasized. (A.L.) [pt

  16. Safety procedures in operation of inspection and maintenance of pressure reduction and metering stations

    International Nuclear Information System (INIS)

    Villas Boas, Ademar Jose; Biesemeyer, Marco Aurelio R.

    2000-01-01

    Each local Natural Gas Distribution Company in Brazil has its own working procedures for operations of inspection and maintenance on equipment and accessories connected to the gas network. Some of these Companies developed a better elaborated and documented way of working routines, while others only work based on their operators experience. The objective of this work is to create a standard procedure for operations of inspection and maintenance of Pressure Reducing Stations and Metering Stations, mainly the ones concerned to safety aspects. This work has no intention of exhausting all aspects related to this subject but to become the first step to standardize these types of operations among Natural Gas Distribution Companies. (author)

  17. Preliminary Validation of the Small Aircraft Transportation System Higher Volume Operations (SATS HVO) Concept

    Science.gov (United States)

    Williams, Daniel; Consiglio, Maria; Murdoch, Jennifer; Adams, Catherine

    2004-01-01

    This document provides a preliminary validation of the Small Aircraft Transportation System (SATS) Higher Volume Operations (HVO) concept for normal conditions. Initial results reveal that the concept provides reduced air traffic delays when compared to current operations without increasing pilot workload. Characteristic to the SATS HVO concept is the establishment of a newly defined area of flight operations called a Self-Controlled Area (SCA) which would be activated by air traffic control (ATC) around designated non-towered, non-radar airports. During periods of poor visibility, SATS pilots would take responsibility for separation assurance between their aircraft and other similarly equipped aircraft in the SCA. Using onboard equipment and simple instrument flight procedures, they would then be better able to approach and land at the airport or depart from it. This concept would also require a new, ground-based automation system, typically located at the airport that would provide appropriate sequencing information to the arriving aircraft. Further validation of the SATS HVO concept is required and is the subject of ongoing research and subsequent publications.

  18. Solution Procedure for Transport Modeling in Effluent Recharge Based on Operator-Splitting Techniques

    Directory of Open Access Journals (Sweden)

    Shutang Zhu

    2008-01-01

    Full Text Available The coupling of groundwater movement and reactive transport during groundwater recharge with wastewater leads to a complicated mathematical model, involving terms to describe convection-dispersion, adsorption/desorption and/or biodegradation, and so forth. It has been found very difficult to solve such a coupled model either analytically or numerically. The present study adopts operator-splitting techniques to decompose the coupled model into two submodels with different intrinsic characteristics. By applying an upwind finite difference scheme to the finite volume integral of the convection flux term, an implicit solution procedure is derived to solve the convection-dominant equation. The dispersion term is discretized in a standard central-difference scheme while the dispersion-dominant equation is solved using either the preconditioned Jacobi conjugate gradient (PJCG method or Thomas method based on local-one-dimensional scheme. The solution method proposed in this study is applied to the demonstration project of groundwater recharge with secondary effluent at Gaobeidian sewage treatment plant (STP successfully.

  19. Oak Ridge National Laboratory whole-body counter: internal operating procedure manual

    International Nuclear Information System (INIS)

    Berger, C.D.; Lane, B.H.

    1982-08-01

    The general purpose of the ORNL Whole Body Counter is to provide a rapid estimation of the type and quantity of radionuclide deposited in the human body. This report contains a review of the equipment in use at the facility and the procedure for its operation, the standard procedure for performing a routine whole body count, and a discussion of interpretation of results

  20. Procedure for hazards analysis of plutonium gloveboxes used in analytical chemistry operations

    International Nuclear Information System (INIS)

    Delvin, W.L.

    1977-06-01

    A procedure is presented to identify and assess hazards associated with gloveboxes used for analytical chemistry operations involving plutonium. This procedure is based upon analytic tree methodology and it has been adapted from the US Energy Research and Development Administration's safety program, the Management Oversight and Risk Tree

  1. Guidelines for the preparation of emergency operating procedures. Resolution of comments on NUREG-0799

    International Nuclear Information System (INIS)

    1982-08-01

    The purpose of this document is to identify the elements necessary for utilities to prepare and implement a program of Emergency Operating Procedures (EOPs) for use by control room personnel to assist in mitigating the consequences of a broad range of accidents and multiple equipment failures. This document applies only to the EOPs so designated; it does not address emergency preparedness or emergency planning. It also represents the resolution of comments on NUREG-0799, Draft Criteria for Preparation of Emergency Operating Procedures

  2. Development and application of emergency operating procedures for nuclear power plants

    International Nuclear Information System (INIS)

    Lin Chengge

    1990-01-01

    The development and application of emergency operating procedures (EOPs) is an important measure to assure the operational safety for nuclear power plants. Event-oriented, symptom-, function- and state-oriented EOPs with their structures, interfaces, development procedures and practical application are described. The ideas and approach can be available for the preparation of EOPs for nuclear power plants which are going to be in service

  3. Operating manual for the High Flux Isotope Reactor: operating procedures, Part 2

    Energy Technology Data Exchange (ETDEWEB)

    None

    1982-11-01

    Information is presented concerning the research facilities; cooling systems; contaiment heating, ventilating, and air conditioning; emergency procedures; waste systems; on-site utilites; records and data accumulation; auxiliary equipment; and technical specifications requirement.

  4. Analysis of excimer laser radiant exposure effect toward corneal ablation volume at LASIK procedure

    Science.gov (United States)

    Adiati, Rima Fitria; Rini Rizki, Artha Bona; Kusumawardhani, Apriani; Setijono, Heru; Rahmadiansah, Andi

    2016-11-01

    LASIK (Laser Asissted In Situ Interlamelar Keratomilieusis) is a technique for correcting refractive disorders of the eye such as myopia and astigmatism using an excimer laser. This procedure use photoablation technique to decompose corneal tissues. Although preferred due to its efficiency, permanency, and accuracy, the inappropriate amount radiant exposure often cause side effects like under-over correction, irregular astigmatism and problems on surrounding tissues. In this study, the radiant exposure effect toward corneal ablation volume has been modelled through several processes. Data collecting results is laser data specifications with 193 nm wavelength, beam diameter of 0.065 - 0.65 cm, and fluence of 160 mJ/cm2. For the medical data, the myopia-astigmatism value, cornea size, corneal ablation thickness, and flap data are taken. The first modelling step is determining the laser diameter between 0.065 - 0.65 cm with 0.45 cm increment. The energy, power, and intensity of laser determined from laser beam area. Number of pulse and total energy is calculated before the radiant exposure of laser is obtained. Next is to determine the parameters influence the ablation volume. Regression method used to create the equation, and then the spot size is substituted to the model. The validation used is statistic correlation method to both experimental data and theory. By the model created, it is expected that any potential complications can be prevented during LASIK procedures. The recommendations can give the users clearer picture to determine the appropriate amount of radiant exposure with the corneal ablation volume necessary.

  5. Reactor operating procedures for start up of continuously operated chemical plants

    NARCIS (Netherlands)

    Verwijs, J.W.; Verwijs, J.W.; Kösters, P.H.; van den Berg, Henderikus; Westerterp, K.R.; Kosters, P.G.H.

    1995-01-01

    Rules are presented for the startup of an adiabatic tubular reactor, based on a qualitative analysis of the dynamic behavior of continuously-operated vapor- and liquid-phase processes. The relationships between the process dynamics, operating criteria, and operating constraints are investigated,

  6. Operating reactors licensing actions summary. Volume 5, No. 2

    International Nuclear Information System (INIS)

    1985-04-01

    The Operating Reactors Licensing Actions Summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management. This summary report is published primarily for internal NRC use in managing the Operating Reactors Licensing Actions Program

  7. Preliminary Investigation of Time Remaining Display on the Computer-based Emergency Operating Procedure

    Science.gov (United States)

    Suryono, T. J.; Gofuku, A.

    2018-02-01

    One of the important thing in the mitigation of accidents in nuclear power plant accidents is time management. The accidents should be resolved as soon as possible in order to prevent the core melting and the release of radioactive material to the environment. In this case, operators should follow the emergency operating procedure related with the accident, in step by step order and in allowable time. Nowadays, the advanced main control rooms are equipped with computer-based procedures (CBPs) which is make it easier for operators to do their tasks of monitoring and controlling the reactor. However, most of the CBPs do not include the time remaining display feature which informs operators of time available for them to execute procedure steps and warns them if the they reach the time limit. Furthermore, the feature will increase the awareness of operators about their current situation in the procedure. This paper investigates this issue. The simplified of emergency operating procedure (EOP) of steam generator tube rupture (SGTR) accident of PWR plant is applied. In addition, the sequence of actions on each step of the procedure is modelled using multilevel flow modelling (MFM) and influenced propagation rule. The prediction of action time on each step is acquired based on similar case accidents and the Support Vector Regression. The derived time will be processed and then displayed on a CBP user interface.

  8. Integration of emergency action levels with Combustion Engineering Emergency Operating Procedures

    International Nuclear Information System (INIS)

    Faletti, D.W.; Jamison, J.D.

    1985-09-01

    This report documents the development of a method for integrating Emergency Action Levels (EALs) with plant-specific Emergency Operating Procedures (EOPs) using the Combustion Engineering Owners' Group Emergency Operating Procedure Technical Guidelines (CEOG EOPTFs). EALs are discrete conditions or values of plant operating parameters which, if exceeded, require declaration of an appropriate level of emergency. At most operating plants, the EALs and event classification procedures are totally separate from the Emergency Operating Procedures used by the plant staff to control the plant during abnormal conditions. Control room personnel using the EOPs to deal with abnormal plant conditions must recognize when plant safety is sufficiently degraded that an emergency declaration may be warranted, and then enter a separate classification procedure containing EALs for a number of plant conditions and parameters. The operator then compares the existing plant conditions to the EALs and makes an emergency declaration accordingly. Using the Combustion Engineering Owners' Group Technical Guidelines document, a set of emergency class definitions and criteria were developed based on the status of the three main fission product barriers (fuel cladding, primary coolant system and containment). The EOPTGs were then annotated with suggested guidance to a procedure writer. The proposed method was tested by applying it to the reactor accident sequences that were shown in the reactor safety study to dominate accident risk. The object of the test was to determine if an EAL set linked to the EOP annotations would produce timely and accurate classification of the risk-dominant sequences. 6 refs., 13 figs., 31 tabs

  9. Impact of an electronic health record operating room management system in ophthalmology on documentation time, surgical volume, and staffing.

    Science.gov (United States)

    Sanders, David S; Read-Brown, Sarah; Tu, Daniel C; Lambert, William E; Choi, Dongseok; Almario, Bella M; Yackel, Thomas R; Brown, Anna S; Chiang, Michael F

    2014-05-01

    Although electronic health record (EHR) systems have potential benefits, such as improved safety and quality of care, most ophthalmology practices in the United States have not adopted these systems. Concerns persist regarding potential negative impacts on clinical workflow. In particular, the impact of EHR operating room (OR) management systems on clinical efficiency in the ophthalmic surgery setting is unknown. To determine the impact of an EHR OR management system on intraoperative nursing documentation time, surgical volume, and staffing requirements. For documentation time and circulating nurses per procedure, a prospective cohort design was used between January 10, 2012, and January 10, 2013. For surgical volume and overall staffing requirements, a case series design was used between January 29, 2011, and January 28, 2013. This study involved ophthalmic OR nurses (n = 13) and surgeons (n = 25) at an academic medical center. Electronic health record OR management system implementation. (1) Documentation time (percentage of operating time documenting [POTD], absolute documentation time in minutes), (2) surgical volume (procedures/time), and (3) staffing requirements (full-time equivalents, circulating nurses/procedure). Outcomes were measured during a baseline period when paper documentation was used and during the early (first 3 months) and late (4-12 months) periods after EHR implementation. There was a worsening in total POTD in the early EHR period (83%) vs paper baseline (41%) (P system implementation was associated with worsening of intraoperative nursing documentation time especially in shorter procedures. However, it is possible to implement an EHR OR management system without serious negative impacts on surgical volume and staffing requirements.

  10. A cost and time analysis of laryngology procedures in the endoscopy suite versus the operating room.

    Science.gov (United States)

    Hillel, Alexander T; Ochsner, Matthew C; Johns, Michael M; Klein, Adam M

    2016-06-01

    To assess the costs, charges, reimbursement, and efficiency of performing awake laryngology procedures in an endoscopy suite (ES) compared with like procedures performed in the operating room (OR). Retrospective review of billing records. Cost, charges, and reimbursements for the hospital, surgeon, and anesthesiologist were compared between ES injection laryngoplasty and laser excision procedures and matched case controls in the OR. Time spent in 1) the preoperative unit, 2) the operating or endoscopy suite, and 3) recovery unit were compared between OR and ES procedures. Hospital expenses were significantly less for ES procedures when compared to OR procedures. Reimbursement was similar for ES and OR injection laryngoplasty, though greater for OR laser excisions. Net balance (reimbursement-expenses) was greater for ES procedures. A predictive model of payer costs over a 3-year period showed similar costs for ES and OR laser procedures and reduced costs for ES compared to OR injection laryngoplasty. Times spent preoperatively and the procedure were significantly less for ES procedures. For individual laryngology procedures, the ES reduces time and costs compared to the OR, increasing otolaryngologist and hospital efficiency. This reveals cost and time savings of ES injection laryngoplasty, which occurs at a similar frequency as OR injection laryngoplasty. Given the increased frequency for ES laser procedures, total costs are similar for ES and OR laser excision of papilloma, which usually require repeated procedures. When regulated office space is unavailable, endoscopy rooms represent an alternative setting for unsedated laryngology procedures. NA Laryngoscope, 126:1385-1389, 2016. © 2015 The American Laryngological, Rhinological and Otological Society, Inc.

  11. Operating reactors licensing actions summary. Volume 5, No. 7

    International Nuclear Information System (INIS)

    1985-09-01

    The Operating Reactors Licensing Actions Summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management

  12. Efficient Procedure to Compute the Microcanonical Volume of Initial Conditions that Lead to Escape Trajectories from a Multidimensional Potential Well

    NARCIS (Netherlands)

    Waalkens, Holger; Burbanks, Andrew; Wiggins, Stephen

    2005-01-01

    A procedure is presented for computing the phase space volume of initial conditions for trajectories that escape or ‘‘react’’ from a multidimensional potential well. The procedure combines a phase space transition state theory, which allows one to construct dividing surfaces that are free of local

  13. Sampling procedures for inventory of commercial volume tree species in Amazon Forest.

    Science.gov (United States)

    Netto, Sylvio P; Pelissari, Allan L; Cysneiros, Vinicius C; Bonazza, Marcelo; Sanquetta, Carlos R

    2017-01-01

    The spatial distribution of tropical tree species can affect the consistency of the estimators in commercial forest inventories, therefore, appropriate sampling procedures are required to survey species with different spatial patterns in the Amazon Forest. For this, the present study aims to evaluate the conventional sampling procedures and introduce the adaptive cluster sampling for volumetric inventories of Amazonian tree species, considering the hypotheses that the density, the spatial distribution and the zero-plots affect the consistency of the estimators, and that the adaptive cluster sampling allows to obtain more accurate volumetric estimation. We use data from a census carried out in Jamari National Forest, Brazil, where trees with diameters equal to or higher than 40 cm were measured in 1,355 plots. Species with different spatial patterns were selected and sampled with simple random sampling, systematic sampling, linear cluster sampling and adaptive cluster sampling, whereby the accuracy of the volumetric estimation and presence of zero-plots were evaluated. The sampling procedures applied to species were affected by the low density of trees and the large number of zero-plots, wherein the adaptive clusters allowed concentrating the sampling effort in plots with trees and, thus, agglutinating more representative samples to estimate the commercial volume.

  14. Journal of Special Operations Medicine, Volume 6, Edition 3

    Science.gov (United States)

    2006-01-01

    between the lower leg muscular planes. These are often times located in multiple places and not radiographically detectable. Volume 6, Edition 3...tinged. Physical examination was remarkable for rales and rhonchi at the left base. There was no jugular venous distension or tracheal deviation... muscular or subcutaneous epinephrine are the first-line treatments for these rare but serious conditions; respi- ratory and intravascular fluid may

  15. Journal of Special Operations Medicine, Volume 2, Edition 3

    Science.gov (United States)

    2002-01-01

    muscle necrosis is extensive it produces a tissue lysis syndrome with lactic acidosis, hyperkalemia, hyperuricemia, hyperphosphatemia, hypocalcemia ... adults , and may require adjust- ment for elderly or very young patients. Volume 2, Edition 3 / Summer 02 27 6. Costrini A: Emergency treatment of...completed annual refresher training in direct laryngoscopy three days prior to this study. A LaedralTM adult intubating manikin was used as the patient in

  16. A Quantitative Analysis of the Relationship between Medicare Payment and Service Volume for Glaucoma Procedures from 2005 through 2009.

    Science.gov (United States)

    Gong, Dan; Jun, Lin; Tsai, James C

    2015-05-01

    To calculate the association between Medicare payment and service volume for 6 commonly performed glaucoma procedures. Retrospective, longitudinal database study. A 100% dataset of all glaucoma procedures performed on Medicare Part B beneficiaries within the United States from 2005 to 2009. Fixed-effects regression model using Medicare Part B carrier data for all 50 states and the District of Columbia, controlling for time-invariant carrier-specific characteristics, national trends in glaucoma service volume, Medicare beneficiary population, number of ophthalmologists, and income per capita. Payment-volume elasticities, defined as the percent change in service volume per 1% change in Medicare payment, for laser trabeculoplasty (Current Procedural Terminology [CPT] code 65855), trabeculectomy without previous surgery (CPT code 66170), trabeculectomy with previous surgery (CPT code 66172), aqueous shunt to reservoir (CPT code 66180), laser iridotomy (CPT code 66761), and scleral reinforcement with graft (CPT code 67255). The payment-volume elasticity was nonsignificant for 4 of 6 procedures studied: laser trabeculoplasty (elasticity, -0.27; 95% confidence interval [CI], -1.31 to 0.77; P = 0.61), trabeculectomy without previous surgery (elasticity, -0.42; 95% CI, -0.85 to 0.01; P = 0.053), trabeculectomy with previous surgery (elasticity, -0.28; 95% CI, -0.83 to 0.28; P = 0.32), and aqueous shunt to reservoir (elasticity, -0.47; 95% CI, -3.32 to 2.37; P = 0.74). Two procedures yielded significant associations between Medicare payment and service volume. For laser iridotomy, the payment-volume elasticity was -1.06 (95% CI, -1.39 to -0.72; P payment, laser iridotomy service volume increased by 1.06%. For scleral reinforcement with graft, the payment-volume elasticity was -2.92 (95% CI, -5.72 to -0.12; P = 0.041): for every 1% decrease in CPT code 67255 payment, scleral reinforcement with graft service volume increased by 2.92%. This study calculated the association

  17. Operating reactors licensing actions summary. Volume 5, No. 6

    International Nuclear Information System (INIS)

    1985-08-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management. This summary report is published for internal NRC use in managing the Operating Reactors Licensing Actions Program. Its content will change based on NRC management informational requirements

  18. Development of automated operating procedure system using fuzzy colored petri nets for nuclear power plants

    International Nuclear Information System (INIS)

    Lee, Seung Jun; Seong, Poong Hyun

    2004-01-01

    In this work, AuTomated Operating Procedure System (ATOPS) is developed. ATOPS is an automation system for emergency operation of a nuclear power plant (NPP) and it can monitor signals, diagnose statuses, and generate control actions according to corresponding operating procedures without any human operator's help. Main functions of ATOPS are an anomaly detection function and a procedure execution function but only the procedure execution function is implemented in this work because this work is just the first step. In the procedure execution function, operating procedures of NPPs are analyzed and modeled using Fuzzy Colored Petri Nets (FCPN) and executed depending on decision making of the inference engine. In this work, ATOPS prototype is developed to demonstrate its feasibility and it is also validated using the FISA-2/WS simulator. The validation is performed for the cases of a loss of coolant accident (LOCA) and a steam generator tube rupture (SGTR). The simulation results show that ATOPS works correctly in the emergency situations

  19. Developments in the preparation of operating procedures for emergency conditions of nuclear power plants

    International Nuclear Information System (INIS)

    1985-06-01

    In recent years a substantial effort has been devoted by the nuclear community to extend Emergency Operating Procedures (EOPs) to cover all conceivable events and to develop procedure formats that transmit the essential guidance to operators in an optimum way. The information given in this report is based upon the most recent developments in formulating and applying EOPs. It should therefore provide guidance to those involved in preparing or reviewing EOPs on the scope, technical basis, organization and format of such procedures. It also outlines the actions required to validate the adequacy and applicability of these procedures so that the correct operator actions are achieved. Examples are given to illustrate the developments in some Member States

  20. Operating reactors licensing actions summary. Volume 5, Number 1

    International Nuclear Information System (INIS)

    1985-03-01

    This document is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program

  1. Automated Kick Control Procedure for an Influx in Managed Pressure Drilling Operations

    Directory of Open Access Journals (Sweden)

    Jing Zhou

    2016-01-01

    Full Text Available Within drilling of oil and gas wells, the Managed Pressure Drilling (MPD method with active control of wellbore pressure during drilling has partly evolved from conventional well control procedures. However, for MPD operations the instrumentation is typically more extensive compared to conventional drilling. Despite this, any influx of formation fluids (commonly known as a kick during MPD operations is typically handled by conventional well control methods, at least if the kick is estimated to be larger than a threshold value. Conventional well control procedures rely on manual control of the blow out preventer, pumps, and choke valves and do not capitalize on the benefits from the instrumentation level associated with MPD. This paper investigates two alternative well control procedures specially adapted to backpressure MPD: the dynamic shut-in (DSI procedure and the automatic kick control (AKC procedure. Both methods capitalize on improvements in Pressure While Drilling (PWD technology. A commercially available PWD tool buffers high-resolution pressure measurements, which can be used in an automated well control procedure. By using backpressure MPD, the choke valve opening is tuned automatically using a feedback-feedforward control method. The two procedures are evaluated using a high fidelity well flow model and cases from a North Sea drilling operation are simulated. The results show that using AKC procedure reduces the time needed to establish control of the well compared to DSI procedure. It also indicates that the AKC procedure reduces the total kick size compared to the DSI procedure, and thereby reduces the risk of lost circulation.

  2. Contribution of the ergonomic analysis to the improvement of the design of operating procedures in nuclear power plants

    International Nuclear Information System (INIS)

    Dien, Y.; Montmayeul, R.

    1992-11-01

    The design of operating procedures for continuous processes is much too often based on implicit assumptions both concerning the operators and the operating conditions that must be dealt with. The merit of the ergonomic approach to the design of procedures is to take account of the way the various operators actually use operating procedures. The actual use is determined from the analysis of on-site operation (normal and incident operating conditions) and the analysis of full-scale simulators tests (incident operating conditions). The introduction of the ergonomic approach in the procedure design results in new design principles being proposed

  3. EVALUASI SANITATION STANDARD OPERATING PROCEDURES KERUPUKAMPLANG DI UD SARINA KECAMATAN KALIANGET KABUPATEN SUMENEP

    Directory of Open Access Journals (Sweden)

    Ach Triharjono

    2016-11-01

    Full Text Available Industri pangan untuk menghasilkan produk yang memenuhi standar keamanan pangan. Standar tersebut dapat dipenuhi dengan menerapkan 8 aspek kunci Sanitation Standard Operating Prosedures (SSOP. Tujuan dari penelitian ini adalah untuk memperoleh hasil penerapan 8 aspek kunci Sanitation Standard Operating Procedures (SSOP dan mengevaluasi penerapan Sanitation Standard Operating Procedures (SSOP Di UD Sarina Kecamatan Kalianget Kabupaten Sumenep. Jenis penelitian ini bersifat deskriptif dengan lokasi penelitian di UD Sarina Kecamatan Kalianget Kabupaten Sumenep. Hasil penelitian diketahui bahwa penerapan 8 aspek kunci Sanitation Standard Operating Procedures (SSOP di UD Sarina sudah terlaksana tapi terdapat 3 tahapan kunci yang belum terlaksana dengan baik yaitu pencegahan kontaminasi silang, pengawasan kondisi kesehatan personil dan menghilangkan hama dari unit pengolahan. Hal yang perlu ditingkatkan terkait dengan penerapan SSOP di UD Sarina yaitu masih perlu adanya manual prosedur untuk berbagai pelaksanaan sanitasi yang dilakukan oleh UD Sarina ini

  4. Automated operator procedure prompting for startup of Experimental Breeder Reactor-2

    Energy Technology Data Exchange (ETDEWEB)

    Renshaw, A.W.; Ball, S.J.; Ford, C.E.

    1990-11-01

    This report describes the development of an operator procedure prompting aid for startup of a nuclear reactor. This operator aid is a preliminary design for a similar aid that eventually will be used with the Advanced Liquid Metal Reactor (ALMR) presently in the design stage. Two approaches were used to develop this operator procedure prompting aid. One method uses an expert system software shell, and the other method uses database software. The preliminary requirements strongly pointed toward features traditionally associated with both database and expert systems software. Database software usually provides data manipulation flexibility and user interface tools, and expert systems tools offer sophisticated data representation and reasoning capabilities. Both methods, including software and associated hardware, are described in this report. Proposals for future enhancements to improve the expert system approach to procedure prompting and for developing other operator aids are also offered. 25 refs., 14 figs.

  5. Automated operator procedure prompting for startup of Experimental Breeder Reactor-2

    International Nuclear Information System (INIS)

    Renshaw, A.W.; Ball, S.J.; Ford, C.E.

    1990-11-01

    This report describes the development of an operator procedure prompting aid for startup of a nuclear reactor. This operator aid is a preliminary design for a similar aid that eventually will be used with the Advanced Liquid Metal Reactor (ALMR) presently in the design stage. Two approaches were used to develop this operator procedure prompting aid. One method uses an expert system software shell, and the other method uses database software. The preliminary requirements strongly pointed toward features traditionally associated with both database and expert systems software. Database software usually provides data manipulation flexibility and user interface tools, and expert systems tools offer sophisticated data representation and reasoning capabilities. Both methods, including software and associated hardware, are described in this report. Proposals for future enhancements to improve the expert system approach to procedure prompting and for developing other operator aids are also offered. 25 refs., 14 figs

  6. A study for Unsafe Act classification under crew interaction during procedure-driven operation

    International Nuclear Information System (INIS)

    Choi, Sun Yeong; Park, Jinkyun; Kim, Yochan; Kim, Seunghwan; Jung, Wondea

    2016-01-01

    Highlights: • The procedure driven operation was divided into four stages by considering the crew relations such as instructions and responses. • Ten patterns of UA occurrence paths and the related operators per path were identified. • The UA type classification scheme was proposed based on the ten patterns of UA occurrence paths. • A case study to implement the UA type classification and to define the related operators per UA was performed. • The UA type classification scheme can be practical in that it prevents bias by subjective judgment. - Abstract: In this study, a method for UA (Unsafe Act) classification under a simulated procedure driven operation was proposed. To this end, a procedure driven operation was divided into four stages by considering the crew relations such as instructions and responses. Based on the four stages of a procedure driven operation, ten patterns of UA occurrence paths and the related operators per path were identified. From the ten types of UA occurrence paths including related operators, it is practicable to trace when and by whom a UA is initiated during a procedure driven operation, and the interaction or causality among the crew after the UA is initiated. Therefore, the types of UAs were classified into ‘Instruction UA’, ‘Reporting UA’, and ‘Execution UA’ by considering the initiation time and initiator of UA. A case study to implement the UA type classification and to define the related operators per UA was performed with the ISLOCA scenario simulator training data. The UA classification scheme proposed in this paper can be practical in that it does not require expertise relatively in a human performance analysis and it prevents bias by subjective judgment because it is based on an observation-based approach to exclude subjective judgment.

  7. Federal Radiological Monitoring and Assessment Center Monitoring Manual Volume 1, Operations

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Aerial Measurement Systems

    2012-07-31

    The Monitoring division is primarily responsible for the coordination and direction of: Aerial measurements to delineate the footprint of radioactive contaminants that have been released into the environment. Monitoring of radiation levels in the environment; Sampling to determine the extent of contaminant deposition in soil, water, air and on vegetation; Preliminary field analyses to quantify soil concentrations or depositions; and Environmental and personal dosimetry for FRMAC field personnel, during a Consequence Management Response Team (CMRT) and Federal Radiological Monitoring and Assessment Center (FRMAC) response. Monitoring and sampling techniques used during CM/FRMAC operations are specifically selected for use during radiological emergencies where large numbers of measurements and samples must be acquired, analyzed, and interpreted in the shortest amount of time possible. In addition, techniques and procedures are flexible so that they can be used during a variety of different scenarios; e.g., accidents involving releases from nuclear reactors, contamination by nuclear waste, nuclear weapon accidents, space vehicle reentries, or contamination from a radiological dispersal device. The Monitoring division also provides technicians to support specific Health and Safety Division activities including: The operation of the Hotline; FRMAC facility surveys; Assistance with Health and Safety at Check Points; and Assistance at population assembly areas which require support from the FRMAC. This volume covers deployment activities, initial FRMAC activities, development and implementation of the monitoring and assessment plan, the briefing of field teams, and the transfer of FRMAC to the EPA.

  8. Acceptance/operational test procedure 101-AW tank camera purge system and 101-AW video camera system

    International Nuclear Information System (INIS)

    Castleberry, J.L.

    1994-01-01

    This procedure will document the satisfactory operation of the 101-AW Tank Camera Purge System (CPS) and the 101-AW Video Camera System. The safety interlock which shuts down all the electronics inside the 101-AW vapor space, during loss of purge pressure, will be in place and tested to ensure reliable performance. This procedure is separated into four sections. Section 6.1 is performed in the 306 building prior to delivery to the 200 East Tank Farms and involves leak checking all fittings on the 101-AW Purge Panel for leakage using a Snoop solution and resolving the leakage. Section 7.1 verifies that PR-1, the regulator which maintains a positive pressure within the volume (cameras and pneumatic lines), is properly set. In addition the green light (PRESSURIZED) (located on the Purge Control Panel) is verified to turn on above 10 in. w.g. and after the time delay (TDR) has timed out. Section 7.2 verifies that the purge cycle functions properly, the red light (PURGE ON) comes on, and that the correct flowrate is obtained to meet the requirements of the National Fire Protection Association. Section 7.3 verifies that the pan and tilt, camera, associated controls and components operate correctly. This section also verifies that the safety interlock system operates correctly during loss of purge pressure. During the loss of purge operation the illumination of the amber light (PURGE FAILED) will be verified

  9. Time cycle calculation procedure for the special crew during the mining mobile machine complex operation

    International Nuclear Information System (INIS)

    Shmurygin, V; Lukyanov, V; Maslovsky, A

    2015-01-01

    The relevance of the research is specified by the necessity to optimize the delft mobile tunneling equipment operation. Target of the research is tunneling time cycle justification for the special crew during the mining mobile machine complex operation. Methods of the research included the consideration of operation organization schemes in the drifting face and effective use of the mobile equipment during mine exploratory working operations. Time cycle calculation procedures for major processes have been considered. This has been done for the special crew during the mobile machine complex operations for several working faces and various organization schemes

  10. A method for risk informing procedures at operating nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Nelson, P. F.; Martin del Campo, C., E-mail: pnelson_007@yahoo.com [UNAM, Facultad de Ingenieria, Departamento de Sistemas Energeticos, Paseo Cuauhnahuac No. 8532, Col. Progreso, 62550 Jiutepec, Morelos (Mexico)

    2012-10-15

    The technical approach presented establishes a framework intended to provide the necessary elements for a deployable human performance monitoring program that incorporates insights from plant specific probabilistic risk assessments, human reliability analysis, as well as the development of plant specific human failure data. A human performance monitoring program of this structure would be used to provide the ability to risk inform procedures (e.g., operations or maintenance) to determine the operational risk significance of procedural performance (i.e., precautions, prerequisites, procedure steps), the likelihood of consequential human error dur the performance of the procedure, and the identification of procedure specific barriers to reduce or eliminate consequential human errors. The program would provide the means to assess procedures prior to execution and the means to record and trend human failure events leading to a plant specific human failure database for human activities characterized as pre-initiator. The technical methods and data processing for each of these areas are developed and presented, as well as an example application of an operational procedure error leading to a plant level event (i.e, plant trip). (Author)

  11. General Urban Warfare Amphibious Logistics Applications. Volume 2. Operations Plan.

    Science.gov (United States)

    1983-06-23

    accordance with Joint Uniform Military Pay System procedures. (3) Control of Financial Institutions. See Force 0 7200.1. (4) Inspection and Audit . Conducted...1CA -- z; a ex r-- - C.’ on~ oCa a 10. 6 Z OZOOOOO 0 0.CCi- ~~flflfl1 Ce aA~ aC0i0SCCS- do.C. m ca f Cit U - CaS.Li CCL*n 0LLaJ ACCA CU ZC CS. . C CA

  12. Effective and efficient learning in the operating theater with intraoperative video-enhanced surgical procedure training.

    Science.gov (United States)

    van Det, M J; Meijerink, W J H J; Hoff, C; Middel, B; Pierie, J P E N

    2013-08-01

    INtraoperative Video Enhanced Surgical procedure Training (INVEST) is a new training method designed to improve the transition from basic skills training in a skills lab to procedural training in the operating theater. Traditionally, the master-apprentice model (MAM) is used for procedural training in the operating theater, but this model lacks uniformity and efficiency at the beginning of the learning curve. This study was designed to investigate the effectiveness and efficiency of INVEST compared to MAM. Ten surgical residents with no laparoscopic experience were recruited for a laparoscopic cholecystectomy training curriculum either by the MAM or with INVEST. After a uniform course in basic laparoscopic skills, each trainee performed six cholecystectomies that were digitally recorded. For 14 steps of the procedure, an observer who was blinded for the type of training determined whether the step was performed entirely by the trainee (2 points), partially by the trainee (1 point), or by the supervisor (0 points). Time measurements revealed the total procedure time and the amount of effective procedure time during which the trainee acted as the operating surgeon. Results were compared between both groups. Trainees in the INVEST group were awarded statistically significant more points (115.8 vs. 70.2; p < 0.001) and performed more steps without the interference of the supervisor (46.6 vs. 18.8; p < 0.001). Total procedure time was not lengthened by INVEST, and the part performed by trainees was significantly larger (69.9 vs. 54.1 %; p = 0.004). INVEST enhances effectiveness and training efficiency for procedural training inside the operating theater without compromising operating theater time efficiency.

  13. Improving the safety and quality of nursing care through standardized operating procedures in Bosnia and Herzegovina.

    Science.gov (United States)

    Ausserhofer, Dietmar; Rakic, Severin; Novo, Ahmed; Dropic, Emira; Fisekovic, Eldin; Sredic, Ana; Van Malderen, Greet

    2016-06-01

    We explored how selected 'positive deviant' healthcare facilities in Bosnia and Herzegovina approach the continuous development, adaptation, implementation, monitoring and evaluation of nursing-related standard operating procedures. Standardized nursing care is internationally recognized as a critical element of safe, high-quality health care; yet very little research has examined one of its key instruments: nursing-related standard operating procedures. Despite variability in Bosnia and Herzegovina's healthcare and nursing care quality, we assumed that some healthcare facilities would have developed effective strategies to elevate nursing quality and safety through the use of standard operating procedures. Guided by the 'positive deviance' approach, we used a multiple-case study design to examine a criterion sample of four facilities (two primary healthcare centres and two hospitals), collecting data via focus groups and individual interviews. In each studied facility, certification/accreditation processes were crucial to the initiation of continuous development, adaptation, implementation, monitoring and evaluation of nursing-related SOPs. In one hospital and one primary healthcare centre, nurses working in advanced roles (i.e. quality coordinators) were responsible for developing and implementing nursing-related standard operating procedures. Across the four studied institutions, we identified a consistent approach to standard operating procedures-related processes. The certification/accreditation process is enabling necessary changes in institutions' organizational cultures, empowering nurses to take on advanced roles in improving the safety and quality of nursing care. Standardizing nursing procedures is key to improve the safety and quality of nursing care. Nursing and Health Policy are needed in Bosnia and Herzegovina to establish a functioning institutional framework, including regulatory bodies, educational systems for developing nurses' capacities or the

  14. Journal of Special Operations Medicine, Volume 3, Edition 2

    Science.gov (United States)

    2003-01-01

    types of fluids and drugs uti - lized and their rates of infusion, as well as the poten- tial for intraosseous infusion in military operations. Many of...Pharmacologic Basis of Therapeutics. Tenth edition: 695 16. American Society of Health-System Pharmacists : AHFS Drug Information. Bethesda, Maryland

  15. Journal of Special Operations Medicine, Volume 3, Edition 3

    Science.gov (United States)

    2003-01-01

    focuses on the basic design, construction, uti - lization, components, and nomenclature associated with the ICS. Objectives: 1. Maximize the overall...TX 76134 9. American Society of Health-System Pharmacists : AHFS Drug Information. Bethesda, Maryland; 2002:1305 Journal of Special Operations

  16. Journal of Special Operations Medicine Volume 1, Edition 1

    Science.gov (United States)

    2001-01-01

    the enemy, and generally regard them with unspo- ken respect. The feelings they must have for those who are realistically threatening their lives...Cobras from the 1st Cav Division area of operation just down to the south of us, Loaches , even a Chi- nook. And fixed wing! We had everything but a B-52

  17. Operating reactors licensing actions summary. Volume 5, No. 9

    International Nuclear Information System (INIS)

    1985-11-01

    This document is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management

  18. Operating reactors licensing actions summary. Volume 5, No. 8

    International Nuclear Information System (INIS)

    1985-10-01

    This summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management

  19. Operating reactors licensing actions summary. Volume 4, No. 9

    International Nuclear Information System (INIS)

    1984-11-01

    This document is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the division of licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management

  20. Better Assessment of Operational Suitability. Volume 2. Case Studies

    Science.gov (United States)

    1992-01-01

    planned but was canceled with the withdrawal of U.S. forces from Viet Nam . 4-2 The program was reinstituted in 1975. The M939 series 5-ton truck resulted...window, but the impact is primarily cosmetic . Video degradation requires prolonged operation in the sand environment and is gradual. In SWA, 24 windows

  1. Transuranic (Tru) waste volume reduction operations at a plutonium facility

    Energy Technology Data Exchange (ETDEWEB)

    Cournoyer, Michael E [Los Alamos National Laboratory; Nixon, Archie E [Los Alamos National Laboratory; Dodge, Robert L [Los Alamos National Laboratory; Fife, Keith W [Los Alamos National Laboratory; Sandoval, Arnold M [Los Alamos National Laboratory; Garcia, Vincent E [Los Alamos National Laboratory

    2010-01-01

    Programmatic operations at the Los Alamos National Laboratory Plutonium Facility (TA 55) involve working with various amounts of plutonium and other highly toxic, alpha-emitting materials. The spread of radiological contamination on surfaces, airborne contamination, and excursions of contaminants into the operator's breathing zone are prevented through use of a variety of gloveboxes (the glovebox, coupled with an adequate negative pressure gradient, provides primary confinement). Size-reduction operations on glovebox equipment are a common activity when a process has been discontinued and the room is being modified to support a new customer. The Actin ide Processing Group at TA-55 uses one-meter-long glass columns to process plutonium. Disposal of used columns is a challenge, since they must be size-reduced to get them out of the glovebox. The task is a high-risk operation because the glass shards that are generated can puncture the bag-out bags, leather protectors, glovebox gloves, and the worker's skin when completing the task. One of the Lessons Learned from these operations is that Laboratory management should critically evaluate each hazard and provide more effective measures to prevent personnel injury. A bag made of puncture-resistant material was one of these enhanced controls. We have investigated the effectiveness of these bags and have found that they safely and effectively permit glass objects to be reduced to small pieces with a plastic or rubber mallet; the waste can then be easily poured into a container for removal from the glove box as non-compactable transuranic (TRU) waste. This size-reduction operation reduces solid TRU waste generation by almost 2% times. Replacing one-time-use bag-out bags with multiple-use glass crushing bags also contributes to reducing generated waste. In addition, significant costs from contamination, cleanup, and preparation of incident documentation are avoided. This effort contributes to the Los Alamos

  2. Transuranic (Tru) waste volume reduction operations at a plutonium facility

    International Nuclear Information System (INIS)

    Cournoyer, Michael E.; Nixon, Archie E.; Dodge, Robert L.; Fife, Keith W.; Sandoval, Arnold M.; Garcia, Vincent E.

    2010-01-01

    Programmatic operations at the Los Alamos National Laboratory Plutonium Facility (TA 55) involve working with various amounts of plutonium and other highly toxic, alpha-emitting materials. The spread of radiological contamination on surfaces, airborne contamination, and excursions of contaminants into the operator's breathing zone are prevented through use of a variety of gloveboxes (the glovebox, coupled with an adequate negative pressure gradient, provides primary confinement). Size-reduction operations on glovebox equipment are a common activity when a process has been discontinued and the room is being modified to support a new customer. The Actin ide Processing Group at TA-55 uses one-meter-long glass columns to process plutonium. Disposal of used columns is a challenge, since they must be size-reduced to get them out of the glovebox. The task is a high-risk operation because the glass shards that are generated can puncture the bag-out bags, leather protectors, glovebox gloves, and the worker's skin when completing the task. One of the Lessons Learned from these operations is that Laboratory management should critically evaluate each hazard and provide more effective measures to prevent personnel injury. A bag made of puncture-resistant material was one of these enhanced controls. We have investigated the effectiveness of these bags and have found that they safely and effectively permit glass objects to be reduced to small pieces with a plastic or rubber mallet; the waste can then be easily poured into a container for removal from the glove box as non-compactable transuranic (TRU) waste. This size-reduction operation reduces solid TRU waste generation by almost 2% times. Replacing one-time-use bag-out bags with multiple-use glass crushing bags also contributes to reducing generated waste. In addition, significant costs from contamination, cleanup, and preparation of incident documentation are avoided. This effort contributes to the Los Alamos National

  3. Knowing the operative game plan: a novel tool for the assessment of surgical procedural knowledge.

    Science.gov (United States)

    Balayla, Jacques; Bergman, Simon; Ghitulescu, Gabriela; Feldman, Liane S; Fraser, Shannon A

    2012-08-01

    What is the source of inadequate performance in the operating room? Is it a lack of technical skills, poor judgment or a lack of procedural knowledge? We created a surgical procedural knowledge (SPK) assessment tool and evaluated its use. We interviewed medical students, residents and training program staff on SPK assessment tools developed for 3 different common general surgery procedures: inguinal hernia repair with mesh in men, laparoscopic cholecystectomy and right hemicolectomy. The tools were developed as a step-wise assessment of specific surgical procedures based on techniques described in a current surgical text. We compared novice (medical student to postgraduate year [PGY]-2) and expert group (PGY-3 to program staff) scores using the Mann-Whitney U test. We calculated the total SPK score and defined a cut-off score using receiver operating characteristic analysis. In all, 5 participants in 7 different training groups (n = 35) underwent an interview. Median scores for each procedure and overall SPK scores increased with experience. The median SPK for novices was 54.9 (95% confidence interval [CI] 21.6-58.8) compared with 98.05 (95% CP 94.1-100.0) for experts (p = 0.012). The SPK cut-off score of 93.1 discriminates between novice and expert surgeons. Surgical procedural knowledge can reliably be assessed using our SPK assessment tool. It can discriminate between novice and expert surgeons for common general surgical procedures. Future studies are planned to evaluate its use for more complex procedures.

  4. Journal of Special Operations Medicine, Volume 7, Edition 1

    Science.gov (United States)

    2007-01-01

    operational funds (OPFUNDs) when available. The local pharmacist provides basic medications and can acquire scarce items when he trav- els to Kandahar...demonstrate a strong capacity to predict resource uti - lization in the contemporary battlefield environment. In the future, such predictive yield could...in Afghanistan. The Russians in Chechnya uti - lized their normal evacuation system designed for conventional war and most often employed ground med

  5. Human Performance in Continuous Operations. Volume 3. Technical Documentation

    Science.gov (United States)

    1980-03-01

    completed for the U. S. Commander, V Corps. Artillery, by Manning (1978). Manning collected information which bears on the following three questions: 0 Can...performance data were not collected in these pre- liminary studies. Field Studies of Continuous Tank OperationsLI __ _ _ __ _ _ _ To simulate a combat...on routine, monotonous tasks tends A show rapid and severe decrement after peri- odk of more than 24 hours without sleep. I Increasing task complexity

  6. Feasibility study report for Operable Unit 4: Volume 1

    International Nuclear Information System (INIS)

    1994-02-01

    This report documents the Feasibility Study (FS) phase of the Fernald Environmental Management Project (FEMP) Operable Unit 4 Remedial Investigation/Feasibility Study (RI/FS) Program. The FEMP, formerly known as the Feed Materials Production Center (FMPC), is a US Department of Energy (DOE) facility that operated from 1952 to 1989. The facility's primarily function was to provide high purity uranium metal products to support United States defense programs. Production operations were suspended in 1989 to focus on environmental restoration and waste management activities at the facility. The RI/FS is being conducted pursuant to the terms of a Consent Agreement between DOE and the US Environmental Protection Agency (EPA) under Sections 120 and 106(a) of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended. The Ohio Environmental Protection Agency (OEPA) is also participating in the RI/FS process at the FEMP through direct involvement in program review meetings and technical review of project documentation. The objective of the RI/FS process is to gather information to support an informed risk management decision regarding which remedy appears to be the most appropriate action for addressing the environmental concerns identified at the FEMP

  7. Risk of Venous Thromboembolism and Operative Duration in Patients Undergoing Neurosurgical Procedures.

    Science.gov (United States)

    Bekelis, Kimon; Labropoulos, Nicos; Coy, Shannon

    2017-05-01

    The association of operative duration with the risk of venous thromboembolism (VTE) has not been quantified in neurosurgery. To investigate the association of surgical duration for several neurosurgical procedures and the incidence of VTE. We performed a retrospective cohort study involving patients who underwent neurosurgical procedures from 2005 to 2012 and were registered in the American College of Surgeons National Quality Improvement Project registry. In order to control for confounding, we used multivariable regression models, and propensity score conditioning. During the study period, there were 94 747 patients, who underwent neurosurgical procedures, and met the inclusion criteria. Of these, 1358 (1.0%) developed VTE within 30 days postoperatively. Multivariable logistic regression demonstrated an association of longer operative duration with higher 30-day incidence of VTE (odds ratio [OR], 1.22; 95% confidence interval [CI], 1.19-1.25). Compared with procedures of moderate duration (third quintile, 40-60th percentile), patients undergoing the longest procedures (>80th percentile) had higher odds (OR, 3.15; 95% CI, 2.49-3.99) of developing VTE. The shortest procedures (<20th percentile) were associated with a decreased incidence of VTE (OR, 0.51; 95% CI, 0.27-0.76) in comparison to those of moderate duration. The same associations were present in propensity score-adjusted models, and models stratified by subgroups of cranial, spinal, peripheral nerve, and carotid procedures. In a cohort of patients from a national prospective surgical registry, increased operative duration was associated with increased incidence of VTE for neurosurgical procedures. These results can be used by neurosurgeons to inform operative management, and to stratify patients with regard to VTE risk. Copyright © 2016 by the Congress of Neurological Surgeons

  8. How to develop a Standard Operating Procedure for sorting unfixed cells

    Science.gov (United States)

    Schmid, Ingrid

    2012-01-01

    Written Standard Operating Procedures (SOPs) are an important tool to assure that recurring tasks in a laboratory are performed in a consistent manner. When the procedure covered in the SOP involves a high-risk activity such as sorting unfixed cells using a jet-in-air sorter, safety elements are critical components of the document. The details on sort sample handling, sorter set-up, validation, operation, troubleshooting, and maintenance, personal protective equipment (PPE), and operator training, outlined in the SOP are to be based on careful risk assessment of the procedure. This review provides background information on the hazards associated with sorting of unfixed cells and the process used to arrive at the appropriate combination of facility design, instrument placement, safety equipment, and practices to be followed. PMID:22381383

  9. How to develop a standard operating procedure for sorting unfixed cells.

    Science.gov (United States)

    Schmid, Ingrid

    2012-07-01

    Written standard operating procedures (SOPs) are an important tool to assure that recurring tasks in a laboratory are performed in a consistent manner. When the procedure covered in the SOP involves a high-risk activity such as sorting unfixed cells using a jet-in-air sorter, safety elements are critical components of the document. The details on sort sample handling, sorter set-up, validation, operation, troubleshooting, and maintenance, personal protective equipment (PPE), and operator training, outlined in the SOP are to be based on careful risk assessment of the procedure. This review provides background information on the hazards associated with sorting of unfixed cells and the process used to arrive at the appropriate combination of facility design, instrument placement, safety equipment, and practices to be followed. Copyright © 2012 Elsevier Inc. All rights reserved.

  10. Towards Verification of Operational Procedures Using Auto-Generated Diagnostic Trees

    Science.gov (United States)

    Kurtoglu, Tolga; Lutz, Robyn; Patterson-Hine, Ann

    2009-01-01

    The design, development, and operation of complex space, lunar and planetary exploration systems require the development of general procedures that describe a detailed set of instructions capturing how mission tasks are performed. For both crewed and uncrewed NASA systems, mission safety and the accomplishment of the scientific mission objectives are highly dependent on the correctness of procedures. In this paper, we describe how to use the auto-generated diagnostic trees from existing diagnostic models to improve the verification of standard operating procedures. Specifically, we introduce a systematic method, namely the Diagnostic Tree for Verification (DTV), developed with the goal of leveraging the information contained within auto-generated diagnostic trees in order to check the correctness of procedures, to streamline the procedures in terms of reducing the number of steps or use of resources in them, and to propose alternative procedural steps adaptive to changing operational conditions. The application of the DTV method to a spacecraft electrical power system shows the feasibility of the approach and its range of capabilities

  11. Estimating the operator's performance time of emergency procedural tasks based on a task complexity measure

    International Nuclear Information System (INIS)

    Jung, Won Dae; Park, Jink Yun

    2012-01-01

    It is important to understand the amount of time required to execute an emergency procedural task in a high-stress situation for managing human performance under emergencies in a nuclear power plant. However, the time to execute an emergency procedural task is highly dependent upon expert judgment due to the lack of actual data. This paper proposes an analytical method to estimate the operator's performance time (OPT) of a procedural task, which is based on a measure of the task complexity (TACOM). The proposed method for estimating an OPT is an equation that uses the TACOM as a variable, and the OPT of a procedural task can be calculated if its relevant TACOM score is available. The validity of the proposed equation is demonstrated by comparing the estimated OPTs with the observed OPTs for emergency procedural tasks in a steam generator tube rupture scenario.

  12. A cadaveric procedural anatomy simulation course improves video-based assessment of operative performance.

    Science.gov (United States)

    Sharma, Gaurav; Aycart, Mario A; O'Mara, Lynne; Havens, Joaquim; Nehs, Matthew; Shimizu, Naomi; Smink, Douglas S; Gravereaux, Edwin; Gates, Jonathan D; Askari, Reza

    2018-03-01

    Inadequate anatomic knowledge has been cited as a major contributor to declining surgical resident operative competence. We analyzed the impact of a comprehensive, procedurally oriented cadaveric procedural anatomy dissection laboratory on the operative performance of surgery residents, hypothesizing that trainees' performance of surgical procedures would improve after such a dissection course. Midlevel general surgery residents (n = 9) participated in an 8 wk, 16-h surgery faculty-led procedurally oriented cadaver simulation course. Both before and after completion of the course, residents participated in a practical examination, in which they were randomized to perform one of nine Surgical Council on Resident Education-designated "essential" procedures. The procedures were recorded using wearable video technology. Videos were deidentified before evaluation by six faculty raters blinded to examinee and whether performances occurred before or after an examinee had taken the course. Raters used the validated Operative Performance Rating System and Objective Structured Assessment of Technical Skill scales. After the course residents had higher procedure-specific scores (median, 4.0 versus 2.4, P 4.0 versus 3.0, P = 0.006), respect for tissue (4.0 versus 3.0, P = 0.0004), time and motion (3.0 versus 2.0, P = 0.0007), operation flow (3.0 versus 2.0, P = 0.0005), procedural knowledge (4.0 versus 2.0, P = 0.0001), and overall performance scores (4.0 versus 2.0, P < 0.0001). Operative Performance Rating System and Objective Structured Assessment of Technical Skill scales averaged by number of items in each were also higher (3.2 versus 2.0, P = 0.0002 and 3.1 versus 2.2, P = 0.002, respectively). A cadaveric procedural anatomy simulation course covering a broad range of open general surgery procedures was associated with significant improvements in trainees' operative performance. Copyright © 2017 Elsevier Inc. All rights reserved.

  13. Clinical significance of computed tomography in the measurement of thyroid volume after operation for Basedow's disease

    International Nuclear Information System (INIS)

    Kasuga, Yoshio; Miyakawa, Makoto; Sugenoya, Akira

    1986-01-01

    The postoperative volume of the thyroid glands was measured using computed tomography (CT) in 16 patients with Basedow's disease. In the group which had normal postoperative thyroid function and did not need to receive T 4 , CT showed increase of thyroid volume. In three of the four patients who needed to receive it, CT showed decreased thyroid volume, as compared with that immediately after operation. CT has proved to serve as a tool for measuring postoperative thyroid volume for Basedow's disease in relation to postoperative prognosis. (Namekawa, K.)

  14. Development of automated generation system of accidental operating procedures for a PWR

    International Nuclear Information System (INIS)

    Artaud, J.L.

    1991-06-01

    The aim of the ACACIA project is to develop an automated generation system of accident operating procedures for a PWR. This research and development study, common at CEA and EDF, has two objectives: at mean-dated the realization of a validation tool and a procedure generation; at long-dated the dynamic generation of real time procedures. This work is consecrated at the realization of 2 prototypes. These prototypes and the technics used are described in detail. The last chapter explores the perspectives given by this type of tool [fr

  15. Upgrade of the Department of Energy's Savannah River Site's reactor operations and maintenance procedures

    International Nuclear Information System (INIS)

    Walsh, T.E.

    1991-01-01

    This paper describes the program in progress at the Savannah River Site (SRS) to upgrade the existing reactor operating and maintenance procedures to current commercial nuclear industry standards. In order to meet this goal, the following elements were established: administrative procedures to govern the upgrade process, tracking system to provide status and accountability; and procedure writing guides. The goal is to establish a benchmark of excellence by which other Department of Energy (DOE) sites will measure themselves. The above three elements are addressed in detail in this paper

  16. GRUKON - A package of applied computer programs system input and operating procedures of functional modules

    International Nuclear Information System (INIS)

    Sinitsa, V.V.; Rineiskij, A.A.

    1993-04-01

    This manual describes a software package for the production of multigroup neutron cross-sections from evaluated nuclear data files. It presents the information necessary for the implementation of the program's modules in the framework of the execution of the program, including: operating procedures of the program, the data input, the macrocommand language, the assignment of the system's procedures. This report also presents the methodology used in the coding of the individual modules: the rules, the syntax, the method of procedures. The report also presents an example of the application of the data processing module. (author)

  17. Improving the review of standard operating procedures: a novel electronic system for compounding pharmacies.

    Science.gov (United States)

    Brensel, Robert; Brensel, Scott; Ng, Amy

    2013-01-01

    Since the New England Compounding Center disaster in 2012, the importance of following correct procedures during every phase of customized pharmacy has been a focus of governmental interest and action as well as public scrutiny. Many pharmacies rely on the rote review of standard operating procedures to ensure that staff members understand and follow protocols that ensure the safety and potency of all compounds prepared, but that approach to continuing education can be cumbersome and needlessly time-consuming. In addition, documenting and retrieving evidence of employee competence can be difficult. In this article, we describe our use of online technology to improve our methods of educating staff about the full range of standard operating procedures that must be followed in our pharmacy. The system we devised and implemented has proven to be effective, easy to update and maintain, very inexpensive, and user friendly. Its use has reduced the time previously required for a read-over review of standard operating procedures from 30 or 40 minutes to 5 or 10 minutes in weekly staff meetings, and we can now easily document and access proof of employees' comprehension of that content. It is our hope that other small compounding pharmacies will also find this system of online standard operating procedure review helpful.

  18. Hospital volumes and later year of operation correlates with better outcomes in acute Type A aortic dissection

    DEFF Research Database (Denmark)

    Geirsson, Arnar; Ahlsson, Anders; Franco-Cereceda, Anders

    2018-01-01

    and C and cardiopulmonary bypass time, whereas later calendar year and higher hospital operative volumes predicted improved survival. CONCLUSIONS: Surgical mortality for acute Type A aortic dissection remains high but has decreased significantly over the last decade. This correlated with later year...... A Aortic Dissection is a retrospective database comprising 1159 patients (mean age 61.6 ± 12.2 years, 68% male) treated for acute Type A aortic dissection at 8 centres in Denmark, Finland, Iceland and Sweden from 2005 to 2014. Data gathered included demographics, symptoms, type of procedure, complications...

  19. Rules and procedures for the design and operation of hazardous research equipment

    International Nuclear Information System (INIS)

    1978-12-01

    The manual has been prepared for use by research personnel involved in experiments at the Lawrence Berkeley Laboratory. It contains rules and procedures for the design, test, installation, and operation of hazardous research equipment. Sect. I contains such information as responsibility of experimenters for safety, descriptions of the various Laboratory safety organizations, and enumeration of various services available to experimenters at the Laboratory. Sect. II describes specific rules for the setup and operation of experimental equipment at the Laboratory. Sect. III gives detailed design criteria and procedures for equipment frequently encountered in the high energy physics laboratory

  20. Operational circular No. 9 – Principles and procedures governing complaints of harassment

    CERN Multimedia

    HR Department

    2011-01-01

    Operational Circular No. 9 entitled "Principles and Procedures Governing Complaints of Harassment", approved by the Director-General following discussion in the Standing Concertation Committee meeting on 21 March 2011, is available on the intranet site of the Human Resources Department: https://cern.ch/hr-docs/opcirc/opcirc.asp Operational Circular No. 9 is applicable to any person working at or on behalf of CERN. It cancels and replaces Administrative Circular No. 32 entitled "Principles and Procedures Governing Complaints of Harassment” of February 2000. Department Head Office

  1. An expert system-based aid for analysis of Emergency Operating Procedures in NPPs

    International Nuclear Information System (INIS)

    Jakubowski, Z.; Beraha, D.

    1996-01-01

    Emergency Operating Procedures (EOPs) generally and an accident management (AM) particularly play a significant part in the safety philosophy on NPPs since many years. A better methodology for development and validation of EOPs is desired. A prototype of an Emergency Operating Procedures Analysis System (EOPAS), which has been developed at GRS, is presented in the paper. The hardware configuration and software organisation of the system is briefly reviewed. The main components of the system such as the knowledge base of an expert system and the engineering simulator are described. (author)

  2. Nuclear data standards - International Evaluation Co-operation volume 7

    International Nuclear Information System (INIS)

    Carlson, A.D.; Shibata, K.; Vonach, H.; Hambsch, F.J.; Chen, Z.; Hofmann, H.M.; Oh, S.Y.; Badikov, S.A.; Gai, E.V.; Pronyaev, V.G.; Smith, D.L.; Hale, G.M.; Kawano, T.; Larson, N.M.

    2006-01-01

    A Working Party on International Evaluation Co-operation was established under the sponsorship of the OECD/NEA Nuclear Science Committee (NSC) to promote the exchange of information on nuclear data evaluations, validation and related topics. Its aim is also to provide a framework for co-operative activities between members of the major nuclear data evaluation projects. This includes the possible exchange of scientists in order to encourage co-operation. Requirements for experimental data resulting from this activity are compiled. The working party determines common criteria for evaluated nuclear data files with a view to assessing and improving the quality and completeness of evaluated data. The parties to the project are: ENDF (United States), JEFF/EFF (NEA Data Bank member countries) and JENDL (Japan). Co-operation with evaluation projects of non-OECD countries is organised through the Nuclear Data Section of the International Atomic Energy Agency (IAEA). This report was issued by Subgroup 7, which was in charge of producing new evaluated neutron cross-section standards. When starting the project, there was a general consensus on the need to update these standards, as significant improvements had been made to the experimental database since 1991 when the last evaluation of these standards was performed. The present work was accomplished through efficient collaboration between a task force of the US Cross-section Evaluation Working Group (CSEWG), a Co-ordinated Research Project (CRP) of the International Atomic Energy Agency (IAEA) and Subgroup 7 of the Working Party on International Evaluation Co-operation (WPEC) of the NEA Nuclear Science Committee. Work is reported on the results of an international effort to evaluate the neutron cross-section standards. The evaluations include the H(n,n), 6 Li(n,t), 10 B(n,α), 10 B(n,α1γ), 197 Au(n,γ), 235 U(n,f) and 238 U(n,f) standard reactions. Evaluations were also produced for the non-standard 238 U(n,γ) and 239 Pu

  3. The study on development of emergency operating procedures based on symptom and risk for accident management

    International Nuclear Information System (INIS)

    Kang, K. S.; Jeong, H. J.

    1998-01-01

    The Advanced EOP(AEOP) has been developed by focusing on the importance of the operators role in emergency conditions. In the AEOP, to overcome the complexity of current EOPs and maintain the consistency of operators action according to plant emergency conditions, operator's task were allocated according to their duties. As an alternative, the Computerized Operator Aid System (COAS) has been developed to reduce operator's burden and provide detailed instructions of procedure. Probabilistic Safety Assessment (PSA) results were synthesized in the AEOP using the event tree to give the awareness and the prediction of accident progression in advance. In conclusion, the existing EOP with its inherent complexity should be simplified and consolidated using computerized operator support system and task allocation to prevent more severe accidents and to reduce operator cognitive overload in emergency conditions

  4. The study on development of emergency operating procedures based on symptom and risk for accident management

    Energy Technology Data Exchange (ETDEWEB)

    Kang, K. S.; Jeong, H. J. [KOPEC, Taejon (Korea, Republic of)

    1998-10-01

    The Advanced EOP(AEOP) has been developed by focusing on the importance of the operators role in emergency conditions. In the AEOP, to overcome the complexity of current EOPs and maintain the consistency of operators action according to plant emergency conditions, operator's task were allocated according to their duties. As an alternative, the Computerized Operator Aid System (COAS) has been developed to reduce operator's burden and provide detailed instructions of procedure. Probabilistic Safety Assessment (PSA) results were synthesized in the AEOP using the event tree to give the awareness and the prediction of accident progression in advance. In conclusion, the existing EOP with its inherent complexity should be simplified and consolidated using computerized operator support system and task allocation to prevent more severe accidents and to reduce operator cognitive overload in emergency conditions.

  5. Prediction of post-operative pain after a laparoscopic tubal ligation procedure

    DEFF Research Database (Denmark)

    Rudin, A.; Wolner-Hanssen, P.; Hellbom, M.

    2008-01-01

    ligation procedure. METHODS: Assessments of anxiety, mood, psychological vulnerability and pre-operative pain were made before surgery using the State-Trait Anxiety Inventory (STAI), the Hospital Anxiety Depression Scale (HADS), a psychological vulnerability test and the Short-Form McGill Pain......BACKGROUND: Pre-operative identification of reliable predictors of post-operative pain may lead to improved pain management strategies. We investigated the correlation between pre-operative pain, psychometric variables, response to heat stimuli and post-operative pain following a laparoscopic tubal...... Questionnaire (SF-MPQ), respectively. Pre-operative assessments of thermal thresholds and pain response to randomized series of heat stimuli (1 s, 44-48 degrees C) were made with quantitative sensory testing technique. Post-operative pain intensity was evaluated daily by a visual analogue scale during rest...

  6. Operative vaginal delivery and invasive procedures in pregnancy among women living with HIV.

    Science.gov (United States)

    Peters, Helen; Francis, Kate; Harding, Kate; Tookey, Pat A; Thorne, Claire

    2017-03-01

    To describe the use and outcomes of operative delivery and invasive procedures in pregnancy amongst women living with HIV. The National Study of HIV in Pregnancy and Childhood (NSHPC) is a comprehensive population-based surveillance study in the UK and Ireland. The NSHPC has collected data on operative delivery since 2008, and invasive procedures in pregnancy (amniocentesis, cordocentesis, chorionic villus sampling) from 2012. Descriptive analyses were conducted on 278 pregnancies expected to deliver from 1 January 2008 with outcome reported to the NSHPC by 31 March 2016. Among 9372 pregnancies in 2008-2016, there were 9072 livebirths with 251 operative deliveries and 27 invasive procedures in pregnancy reported. Information was available for 3023/3490 vaginal deliveries, and use of forceps or vacuum reported in 251deliveries (8.2%), increasing over calendar time to almost 10% by 2014-16. Forceps were used twice as often as vacuum delivery, and forceps use increased over time. One infant delivered operatively is known to have acquired HIV. From 2012 there were 4063 pregnancies resulting in 3952 livebirths, 83 terminations and 28 stillbirths. 2163/4063 had information on use (or not) of invasive procedures in pregnancy. Amniocentesis was reported in 25/2163 pregnancies, there was one report of chorionic villus sampling and one of cordocentesis. There were no reported transmissions following invasive procedures in pregnancy. This is the largest study to date to report on operative delivery in women living with HIV on combined antiretroviral therapy (cART), and provides an up-to-date picture of invasive procedures during pregnancy in this group. Findings from this comprehensive national study are reassuring but numbers are currently low; on-going monitoring is crucial as obstetric care of women with HIV becomes normalised. Copyright © 2017 Elsevier B.V. All rights reserved.

  7. Operation of Wastewater Treatment Plants: A Field Study Training Program. Volume I. Second Edition.

    Science.gov (United States)

    California State Univ., Sacramento. Dept. of Civil Engineering.

    This manual was prepared by experienced wastewater collection system workers to provide a home study course to develop new qualified workers and expand the abilities of existing workers. This volume is directed primarily towards entry-level operators and the operators of ponds, package plants, or small treatment plants. Ten chapters examine the…

  8. Recent trends in operator theory and partial differential equations the Roland Duduchava anniversary volume

    CERN Document Server

    Natroshvili, David; Shargorodsky, Eugene; Wendland, Wolfgang

    2017-01-01

    This volume is dedicated to the eminent Georgian mathematician Roland Duduchava on the occasion of his 70th birthday. It presents recent results on Toeplitz, Wiener-Hopf, and pseudodifferential operators, boundary value problems, operator theory, approximation theory, and reflects the broad spectrum of Roland Duduchava's research. The book is addressed to a wide audience of pure and applied mathematicians.

  9. Main-coolant-pump shaft-seal guidelines. Volume 2. Operational guidelines. Final report

    International Nuclear Information System (INIS)

    Fair, C.E.; Greer, A.O.

    1983-03-01

    This report presents a set of guidelines and criteria for improving main coolant pump shaft seal operational reliability. The noted guidelines are developed from EPRI sponsored nuclear power plant seal operating experience studies. Usage procedures/practices and operational environment influence on seal life and reliability from the most recent such survey are summarized. The shaft seal and its auxiliary supporting systems are discussed both from technical and operational related viewpoints

  10. The BWR [Boiling Water Reactor] Emergency Operating Procedures Tracking System (EOPTS): Evaluation by control-room operating crews

    International Nuclear Information System (INIS)

    Spurgin, A.J.; Orvis, D.D.; Spurgin, J.P.; Luna, C.J.

    1990-05-01

    This report presents the results of a project sponsored by the Electric Power Research Institute (EPRI) and Taiwan Power Company (TPC) and conducted by APG and TPC to perform evaluation of the Emergency Operating Procedures Tracking System (EOPTS). The EOPTS is an expert system employing artificial intelligence techniques developed by EPRI for Boiling Water Reactor (BWR) plants based on emergency operating procedures (EOPs). EOPTS is a computerized decision aid used to assist plant operators in efficient and reliable use of EOPs. The main objective of this project was to evaluate the EOPTS and determine how an operator aid of this type could noticeably improve the response time and the reliability of control room crews to multi-failure scenarios. A secondary objective was to collect data on how crew performance was affected. Experiments results indicate that the EOPTS measurably improves crew performance over crews using the EOP flow charts. Time-comparison measurements indicate that crews using the EOPTS perform required actions more quickly than do those using the flowcharts. The results indicate that crews using the EOPTS are not only faster and more consistent in their actions but make fewer errors. In addition, they have a higher likelihood of recovering from the errors that they do make. Use of the EOPTS in the control room should result in faster termination and mitigation of accidents and reduced risk of power plant operations. Recommendations are made towards possible applications of the EOPTS to operator training and evaluation, and for the applicability of the evaluation methodology developed for this project to the evaluation of similar operator aides. 17 refs., 14 figs., 14 tabs

  11. Surveillance of Environmental and Procedural Measures of Infection Control in the Operating Theatre Setting

    Directory of Open Access Journals (Sweden)

    Laura Dallolio

    2017-12-01

    Full Text Available The microbiological contamination of operating theatres and the lack of adherence to best practices by surgical staff represent some of the factors affecting Surgical Site Infections (SSIs. The aim of the present study was to assess the microbiological quality of operating settings and the staff compliance to the SSI evidence-based control measures. Ten operating rooms were examined for microbiological contamination of air and surfaces, after cleaning procedures, in “at rest” conditions. Furthermore, 10 surgical operations were monitored to assess staff compliance to the recommended practices. None of the air samples exceeded microbiological reference standards and only six of the 200 surface samples (3.0% were slightly above recommended levels. Potentially pathogenic bacteria and moulds were never detected. Staff compliance to best practices varied depending on the type of behaviour investigated and the role of the operator. The major not compliant behaviours were: pre-operative skin antisepsis, crowding of the operating room and hand hygiene of the anaesthetist. The good environmental microbiological quality observed is indicative of the efficacy of the cleaning-sanitization procedures adopted. The major critical point was staff compliance to recommended practices. Awareness campaigns are therefore necessary, aimed at improving the organisation of work so as to facilitate compliance to operative protocols.

  12. 40 CFR 63.1104 - Process vents from continuous unit operations: applicability assessment procedures and methods.

    Science.gov (United States)

    2010-07-01

    ...) Necessitating that the owner or operator make product in excess of demand. (e) TOC or Organic HAP concentration....306×10 −2 a Use according to procedures outlined in this section. MJ/scm = Mega Joules per standard cubic meter. scm/min = Standard cubic meters per minute. (2) Nonhalogenated process vents. The owner or...

  13. Standard operating procedures for female orgasmic disorder: consensus of the International Society for Sexual Medicine

    NARCIS (Netherlands)

    Laan, Ellen; Rellini, Alessandra H.; Barnes, Tricia

    2013-01-01

    As the field of sexual medicine evolves, it is important to continually improve patient care by developing contemporary "standard operating procedures" (SOPs), reflecting the consensus view of experts in sexual medicine. Few, if any, consensus SOPs have been developed for the diagnosis and treatment

  14. A review of procedures available to seismically requalify operating nuclear plant structures, equipment and distribution systems

    International Nuclear Information System (INIS)

    Stevenson, J.D.

    1985-01-01

    It is well known that the loads and procedures used to seismically qualify nuclear power plant structures and components have changed dramatically during the past 15 to 20 years. In this paper, the various methods available to seismically qualify or requalify structures and components in operating nuclear power plants are identified and the advantages and disadvantages of each briefly summarized. (orig.)

  15. Trial operation of the advanced volume reduction facilities for LLW at JAEA

    International Nuclear Information System (INIS)

    Nakashio, Nobuyuki; Higuchi, Hidekazu; Momma, Toshiyuki; Kozawa, Kazushige; Touhei, Toshio; Sudou, Tomoyuki; Mitsuda, Motoyuki; Kurosawa, Shigenobu; Hemmi, Kou; Ishikawa, Joji; Kato, Mitsugu; Sato, Motoaki

    2007-01-01

    The Japan Atomic Energy Agency (JAEA) constructed the Advanced Volume Reduction Facilities (AVRF), in which volume reduction techniques are applied and achieved high volume reduction ratio, homogenization and stabilization by means of melting or super compaction processes for low level radioactive solid wastes. It will be able to produce waste packages for final disposal and to reduce the volume of stored wastes by operating the AVRF. The AVRF consist of the Waste Size Reduction and Storage Facilities (WSRSF) and the Waste Volume Reduction Facilities (WVRF); the former has cutting installations for large size wastes and the latter has melting units and a super compactor. Cutting installations in the WSRSF have been operating since July 1999. Radioactive wastes treated so far amount to 750 m 3 and the volume reduction ratio is from 1.7 to 3.7. The WVRF has been operating with non-radioactive wastes since February 2003 for the training and the homogeneity investigation in the melting processes. The operation of the pretreatment system in the WVRF with radioactive wastes has partly started in FY2005. (author)

  16. Human factors evaluation of teletherapy: Human-system interfaces and procedures. Volume 3

    International Nuclear Information System (INIS)

    Kaye, R.D.; Henriksen, K.; Jones, R.; Morisseau, D.S.; Serig, D.I.

    1995-07-01

    A series of human factors evaluations was undertaken to better understand the contributing factors to human error in the teletherapy environment. Teletherapy is a multidisciplinary methodology for treating cancerous tissue through selective exposure to an external beam of ionizing radiation. The principal sources of radiation are a radioactive isotope, typically cobalt60 (Co-60), or a linear accelerator device capable of producing very high energy x-ray and electron beams. A team of human factors specialists conducted site visits to radiation oncology departments at community hospitals, university centers, and free-standing clinics. In addition, a panel of radiation oncologists, medical physicists, and radiation technologists served as subject matter experts. A function and task analysis was initially performed to guide subsequent evaluations in the areas of user-system interfaces, procedures, training and qualifications, and organizational policies and practices. The present report focuses on an evaluation of the human-system interfaces in relation to the treatment machines and supporting equipment (e.g., simulators, treatment planning computers, control consoles, patient charts) found in the teletherapy environment. The report also evaluates operating, maintenance and emergency procedures and practices involved in teletherapy. The evaluations are based on the function and task analysis and established human engineering guidelines, where applicable

  17. Human factors evaluation of teletherapy: Human-system interfaces and procedures. Volume 3

    Energy Technology Data Exchange (ETDEWEB)

    Kaye, R.D.; Henriksen, K.; Jones, R. [Hughes Training, Inc., Falls Church, VA (United States); Morisseau, D.S.; Serig, D.I. [Nuclear Regulatory Commission, Washington, DC (United States). Div. of Systems Technology

    1995-07-01

    A series of human factors evaluations was undertaken to better understand the contributing factors to human error in the teletherapy environment. Teletherapy is a multidisciplinary methodology for treating cancerous tissue through selective exposure to an external beam of ionizing radiation. The principal sources of radiation are a radioactive isotope, typically cobalt60 (Co-60), or a linear accelerator device capable of producing very high energy x-ray and electron beams. A team of human factors specialists conducted site visits to radiation oncology departments at community hospitals, university centers, and free-standing clinics. In addition, a panel of radiation oncologists, medical physicists, and radiation technologists served as subject matter experts. A function and task analysis was initially performed to guide subsequent evaluations in the areas of user-system interfaces, procedures, training and qualifications, and organizational policies and practices. The present report focuses on an evaluation of the human-system interfaces in relation to the treatment machines and supporting equipment (e.g., simulators, treatment planning computers, control consoles, patient charts) found in the teletherapy environment. The report also evaluates operating, maintenance and emergency procedures and practices involved in teletherapy. The evaluations are based on the function and task analysis and established human engineering guidelines, where applicable.

  18. Pre-operative renal volume predicts peak creatinine after congenital heart surgery in neonates.

    Science.gov (United States)

    Carmody, J Bryan; Seckeler, Michael D; Ballengee, Cortney R; Conaway, Mark; Jayakumar, K Anitha; Charlton, Jennifer R

    2014-10-01

    Acute kidney injury is common in neonates following surgery for congenital heart disease. We conducted a retrospective analysis to determine whether neonates with smaller pre-operative renal volume were more likely to develop post-operative acute kidney injury. We conducted a retrospective review of 72 neonates who underwent congenital heart surgery for any lesion other than patent ductus arteriosus at our institution from January 2007 to December 2011. Renal volume was calculated by ultrasound using the prolate ellipsoid formula. The presence and severity of post-operative acute kidney injury was determined both by measuring the peak serum creatinine in the first 7 days post-operatively and by using the Acute Kidney Injury Network scoring system. Using a linear change point model, a threshold renal volume of 17 cm³ was identified. Below this threshold, there was an inverse linear relationship between renal volume and peak post-operative creatinine for all patients (p = 0.036) and the subgroup with a single morphologic right ventricle (p = 0.046). There was a non-significant trend towards more acute kidney injury using Acute Kidney Injury Network criteria in all neonates with renal volume ≤17 cm³ (p = 0.11) and in the subgroup with a single morphologic right ventricle (p = 0.17). Pre-operative renal volume ≤17 cm³ is associated with a higher peak post-operative creatinine and potentially greater risk for post-operative acute kidney injury for neonates undergoing congenital heart surgery. Neonates with a single right ventricle may be at higher risk.

  19. Human factors review of electric power dispatch control centers. Volume 4. Operator information needs. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Miller, R.J.; Najaf-Zadeh, K.; Darlington, H.T.; McNair, H.D.; Seidenstein, S.; Williams, A.R.

    1982-10-01

    Human factors is a systems-oriented interdisciplinary specialty concerned with the design of systems, equipment, facilities and the operational environment. An important aspect leading to the design requirements is the determination of the information requirements for electric power dispatch control centers. There are significant differences between the system operator's actions during normal and degraded states of power system operation, and power system restoration. This project evaluated the information the operator requires for normal power system and control system operations and investigates the changes of information required by the operator as the power system and/or the control system degrades from a normal operating state. The Phase II study, published in two volumes, defines power system states and control system conditions to which operator information content can be related. This volume presents detailed data concerning operator information needs that identify the needs for and the uses of power system information by a system operator in conditions ranging from normal through degraded operation. The study defines power system states and control system conditions to which operator information content can be related, and it identifies the requisite information as consistent with current industry practice so as to aid control system designers. Training requirements are also included for planning entry-level and follow-on training for operators.

  20. Procedures for using expert judgment to estimate human-error probabilities in nuclear power plant operations

    International Nuclear Information System (INIS)

    Seaver, D.A.; Stillwell, W.G.

    1983-03-01

    This report describes and evaluates several procedures for using expert judgment to estimate human-error probabilities (HEPs) in nuclear power plant operations. These HEPs are currently needed for several purposes, particularly for probabilistic risk assessments. Data do not exist for estimating these HEPs, so expert judgment can provide these estimates in a timely manner. Five judgmental procedures are described here: paired comparisons, ranking and rating, direct numerical estimation, indirect numerical estimation and multiattribute utility measurement. These procedures are evaluated in terms of several criteria: quality of judgments, difficulty of data collection, empirical support, acceptability, theoretical justification, and data processing. Situational constraints such as the number of experts available, the number of HEPs to be estimated, the time available, the location of the experts, and the resources available are discussed in regard to their implications for selecting a procedure for use

  1. Standard operating procedures improve acute neurologic care in a sub-Saharan African setting.

    Science.gov (United States)

    Jaiteh, Lamin E S; Helwig, Stefan A; Jagne, Abubacarr; Ragoschke-Schumm, Andreas; Sarr, Catherine; Walter, Silke; Lesmeister, Martin; Manitz, Matthias; Blaß, Sebastian; Weis, Sarah; Schlund, Verena; Bah, Neneh; Kauffmann, Jil; Fousse, Mathias; Kangankan, Sabina; Ramos Cabrera, Asmell; Kronfeld, Kai; Ruckes, Christian; Liu, Yang; Nyan, Ousman; Fassbender, Klaus

    2017-07-11

    Quality of neurologic emergency management in an under-resourced country may be improved by standard operating procedures (SOPs). Neurologic SOPs were implemented in a large urban (Banjul) and a small rural (Brikama) hospital in the Gambia. As quality indicators of neurologic emergency management, performance of key procedures was assessed at baseline and in the first and second implementation years. At Banjul, 100 patients of the first-year intervention group exhibited higher rates of general procedures of emergency management than 105 control patients, such as neurologic examination (99.0% vs 91.4%; p process quality of neurologic emergency management in under-resourced settings. This study provides Class IV evidence that, for patients with suspected neurologic emergencies in sub-Saharan Africa, neurologic SOPs increase the rate of performance of guideline-recommended procedures. Copyright © 2017 The Author(s). Published by Wolters Kluwer Health, Inc. on behalf of the American Academy of Neurology.

  2. NRC/FEMA operational response procedures for response to a commercial nuclear reactor accident

    International Nuclear Information System (INIS)

    1983-11-01

    Procedures have been developed by the US Nuclear Regulatory Commission (NRC) and the Federal Emergency Management Agency (FEMA) which provide the response teams of both agencies with the steps to be taken in responding to an emergency at a commercial nuclear power plant. The emphasis of these procedures is mainly on the interface between NRC and FEMA at their respective Headquarters and Regional Offices and at the various sites at which such an emergency could occur. Detailed procedures are presented that cover for both agencies, notification schemes and manner of activation, organizations at Headquaters and the site, interface procedures, coordination of onsite and offsite operations, the role of the Senior FEMA Official, and the cooperative efforts of each agency's public information staff

  3. NRC/FEMA operational response procedures for response to a commercial nuclear reactor accident. Revision 1

    International Nuclear Information System (INIS)

    1985-02-01

    Procedures have been developed by the US Nuclear Regulatory Commission (NRC) and the Federal Emergency Management Agency (FEMA) which provide the response teams of both agencies with the steps to be taken in responding to an emergency at a commercial nuclear power plant. The emphasis of these procedures is mainly on the interface between NRC and FEMA at their respective Headquarters and Regional Offices and at the various sites at which such an emergency could occur. Detailed procedures are presented that cover for both agencies, notification schemes and manner of activation, organizations at Headquarters and the site, interface procedures, coordination of onsite and offsite operations, the role of the Senior FEMA Official, and the cooperative efforts of each agency's public information staff

  4. Bootstrap-based procedures for inference in nonparametric receiver-operating characteristic curve regression analysis.

    Science.gov (United States)

    Rodríguez-Álvarez, María Xosé; Roca-Pardiñas, Javier; Cadarso-Suárez, Carmen; Tahoces, Pablo G

    2018-03-01

    Prior to using a diagnostic test in a routine clinical setting, the rigorous evaluation of its diagnostic accuracy is essential. The receiver-operating characteristic curve is the measure of accuracy most widely used for continuous diagnostic tests. However, the possible impact of extra information about the patient (or even the environment) on diagnostic accuracy also needs to be assessed. In this paper, we focus on an estimator for the covariate-specific receiver-operating characteristic curve based on direct regression modelling and nonparametric smoothing techniques. This approach defines the class of generalised additive models for the receiver-operating characteristic curve. The main aim of the paper is to offer new inferential procedures for testing the effect of covariates on the conditional receiver-operating characteristic curve within the above-mentioned class. Specifically, two different bootstrap-based tests are suggested to check (a) the possible effect of continuous covariates on the receiver-operating characteristic curve and (b) the presence of factor-by-curve interaction terms. The validity of the proposed bootstrap-based procedures is supported by simulations. To facilitate the application of these new procedures in practice, an R-package, known as npROCRegression, is provided and briefly described. Finally, data derived from a computer-aided diagnostic system for the automatic detection of tumour masses in breast cancer is analysed.

  5. Technical procedures for water resources: Volume 4, Deaf Smith County site, Texas: Environmental Field Program: Final draft

    International Nuclear Information System (INIS)

    1987-08-01

    This volume contains Technical Procedures pursuant to the water Resources Site Study Plan: including Collection, Preservation, and Shipment of Ground-Water Samples; Inventory Current Water Use and Estimating Projected Water Use; Estimation of Precipitation Depth, Duration, Frequence; Estimation of Probable Maximum Precipitation; Calculation of Floodplains

  6. Comparison of the effect of paper and computerized procedures on operator error rate and speed of performance

    International Nuclear Information System (INIS)

    Converse, S.A.; Perez, P.B.; Meyer, S.; Crabtree, W.

    1994-01-01

    The Computerized Procedures Manual (COPMA-II) is an advanced procedure manual that can be used to select and execute procedures, to monitor the state of plant parameters, and to help operators track their progress through plant procedures. COPMA-II was evaluated in a study that compared the speed and accuracy of operators' performance when they performed with COPMA-II and traditional paper procedures. Sixteen licensed reactor operators worked in teams of two to operate the Scales Pressurized Water Reactor Facility at North Carolina State University. Each team performed one change of power with each type of procedure to simulate performance under normal operating conditions. Teams then performed one accident scenario with COPMA-II and one with paper procedures. Error rates, performance times, and subjective estimates of workload were collected, and were evaluated for each combination of procedure type and scenario type. For the change of power task, accuracy and response time were not different for COPMA-II and paper procedures. Operators did initiate responses to both accident scenarios fastest with paper procedures. However, procedure type did not moderate response completion time for either accident scenario. For accuracy, performance with paper procedures resulted in twice as many errors as did performance with COPMA-II. Subjective measures of mental workload for the accident scenarios were not affected by procedure type

  7. Analysis of remote operating systems for space-based servicing operations, volume 1

    Science.gov (United States)

    1985-01-01

    A two phase study was conducted to analyze and develop the requirements for remote operating systems as applied to space based operations for the servicing, maintenance, and repair of satellites. Phase one consisted of the development of servicing requirements to establish design criteria for remote operating systems. Phase two defined preferred system concepts and development plans which met the requirements established in phase one. The specific tasks in phase two were to: (1) identify desirable operational and conceptual approaches for selected mission scenarios; (2) examine the potential impact of remote operating systems incorporated into the design of the space station; (3) address remote operating systems design issues, such as mobility, which are effected by the space station configuration; and (4) define the programmatic approaches for technology development, testing, simulation, and flight demonstration.

  8. [Handling modern imaging procedures in a high-tech operating room].

    Science.gov (United States)

    Hüfner, T; Citak, M; Imrecke, J; Krettek, C; Stübig, T

    2012-03-01

    Operating rooms are the central unit in the hospital network in trauma centers. In this area, high costs but also high revenues are generated. Modern operating theater concepts as an integrated model have been offered by different companies since the early 2000s. Our hypothesis is that integrative concepts for operating rooms, in addition to improved operating room ergonomics, have the potential for measurable time and cost savings. In our clinic, an integrated operating room concept (I-Suite, Stryker, Duisburg) was implemented after analysis of the problems. In addition to the ceiling-mounted arrangement, the system includes an endoscopy unit, a navigation system, and a voice control system. In the first 6 months (9/2005 to 2/2006), 112 procedures were performed in the integrated operating room: 34 total knee arthroplasties, 12 endoscopic spine surgeries, and 66 inpatient arthroscopic procedures (28 shoulder and 38 knee reconstructions). The analysis showed a daily saving of 22-45 min, corresponding to 15-30% of the daily changeover times, calculated to account for potential savings in the internal cost allocation of 225-450 EUR. A commercial operating room concept was evaluated in a pilot phase in terms of hard data, including time and cost factors. Besides the described effects further savings might be achieved through the effective use of voice control and the benefit of the sterile handle on the navigation camera, since waiting times for an additional nurse are minimized. The time of the procedure of intraoperative imaging is also reduced due to the ceiling-mounted concept, as the C-arm can be moved freely in the operating theater without hindering cables. By these measures and ensuing improved efficiency, the initial high costs for the implementation of the system may be cushioned over time.

  9. A study on development of the step complexity measure for emergency operating procedures using entropy concepts

    International Nuclear Information System (INIS)

    Park, J. K.; Jung, W. D.; Kim, J. W.; Ha, J. J.

    2001-04-01

    In complex systems, such as nuclear power plants (NPPs) or airplane control systems, human errors play a major role in many accidents. For example, it was reported that about 70% of aviation accidents are due to human errors, and that approximately 28% of accidents in process industries are caused by human errors. According to related studies, written manuals or operating procedures are revealed as one of the most important factors in aviation and manufacturing industries. In case of NPPs, the importance of procedures is more salient than other industries because not only over 50% of human errors were due to procedures but also about 18% of accidents were caused by the failure of following procedures. Thus, the provision of emergency operating procedures (EOPs) that are designed so that the possibility of human errors can be reduced is very important. To accomplish this goal, a quantitative and objective measure that can evaluate EOPs is indispensable. The purpose of this study is the development of a method that can quantify the complexity of a step included in EOPs. In this regard, the step complexity measure (SC) is developed based on three sub-measures such as the SIC (step information complexity), the SLC (step logic complexity) and the SSC (step size complexity). To verify the SC measure, not only quantitative validations (such as comparing SC scores with subjective evaluation results and with averaged step performance time) but also qualitative validations to clarify physical meanings of the SC measure are performed

  10. A study on development of the step complexity measure for emergency operating procedures using entropy concepts

    Energy Technology Data Exchange (ETDEWEB)

    Park, J. K.; Jung, W. D.; Kim, J. W.; Ha, J. J

    2001-04-01

    In complex systems, such as nuclear power plants (NPPs) or airplane control systems, human errors play a major role in many accidents. For example, it was reported that about 70% of aviation accidents are due to human errors, and that approximately 28% of accidents in process industries are caused by human errors. According to related studies, written manuals or operating procedures are revealed as one of the most important factors in aviation and manufacturing industries. In case of NPPs, the importance of procedures is more salient than other industries because not only over 50% of human errors were due to procedures but also about 18% of accidents were caused by the failure of following procedures. Thus, the provision of emergency operating procedures (EOPs) that are designed so that the possibility of human errors can be reduced is very important. To accomplish this goal, a quantitative and objective measure that can evaluate EOPs is indispensable. The purpose of this study is the development of a method that can quantify the complexity of a step included in EOPs. In this regard, the step complexity measure (SC) is developed based on three sub-measures such as the SIC (step information complexity), the SLC (step logic complexity) and the SSC (step size complexity). To verify the SC measure, not only quantitative validations (such as comparing SC scores with subjective evaluation results and with averaged step performance time) but also qualitative validations to clarify physical meanings of the SC measure are performed.

  11. Simultaneous bilateral stereotactic procedure for deep brain stimulation implants: a significant step for reducing operation time.

    Science.gov (United States)

    Fonoff, Erich Talamoni; Azevedo, Angelo; Angelos, Jairo Silva Dos; Martinez, Raquel Chacon Ruiz; Navarro, Jessie; Reis, Paul Rodrigo; Sepulveda, Miguel Ernesto San Martin; Cury, Rubens Gisbert; Ghilardi, Maria Gabriela Dos Santos; Teixeira, Manoel Jacobsen; Lopez, William Omar Contreras

    2016-07-01

    OBJECT Currently, bilateral procedures involve 2 sequential implants in each of the hemispheres. The present report demonstrates the feasibility of simultaneous bilateral procedures during the implantation of deep brain stimulation (DBS) leads. METHODS Fifty-seven patients with movement disorders underwent bilateral DBS implantation in the same study period. The authors compared the time required for the surgical implantation of deep brain electrodes in 2 randomly assigned groups. One group of 28 patients underwent traditional sequential electrode implantation, and the other 29 patients underwent simultaneous bilateral implantation. Clinical outcomes of the patients with Parkinson's disease (PD) who had undergone DBS implantation of the subthalamic nucleus using either of the 2 techniques were compared. RESULTS Overall, a reduction of 38.51% in total operating time for the simultaneous bilateral group (136.4 ± 20.93 minutes) as compared with that for the traditional consecutive approach (220.3 ± 27.58 minutes) was observed. Regarding clinical outcomes in the PD patients who underwent subthalamic nucleus DBS implantation, comparing the preoperative off-medication condition with the off-medication/on-stimulation condition 1 year after the surgery in both procedure groups, there was a mean 47.8% ± 9.5% improvement in the Unified Parkinson's Disease Rating Scale Part III (UPDRS-III) score in the simultaneous group, while the sequential group experienced 47.5% ± 15.8% improvement (p = 0.96). Moreover, a marked reduction in the levodopa-equivalent dose from preoperatively to postoperatively was similar in these 2 groups. The simultaneous bilateral procedure presented major advantages over the traditional sequential approach, with a shorter total operating time. CONCLUSIONS A simultaneous stereotactic approach significantly reduces the operation time in bilateral DBS procedures, resulting in decreased microrecording time, contributing to the optimization of functional

  12. Surveillance of Vittaforma corneae in hot springs by a small-volume procedure.

    Science.gov (United States)

    Chen, Jung-Sheng; Hsu, Tsui-Kang; Hsu, Bing-Mu; Huang, Tung-Yi; Huang, Yu-Li; Shaio, Men-Fang; Ji, Dar-Der

    2017-07-01

    supporting the need for proper control and regulations at hot spring recreational waters in order to avoid health risks from this pathogen. Finally, we have developed a small volume procedure for detecting V. corneae in water samples and this has proved to be very useful. Copyright © 2017 Elsevier Ltd. All rights reserved.

  13. Accuracy of axial depth of cut in micromilling operations - Simplified procedure and uncertainty model

    DEFF Research Database (Denmark)

    Bissacco, Giuliano

    2005-01-01

    , due to the easy breakage particularly when milling on hard materials [1]. Typical values for the errors on the control of the axial depth of cut are in the order of 50 microns, while the aimed depth of cut can be as low as 5 microns. The author has developed a machining procedure for optimal control...... of this investigation is the determination of the uncertainty of the set depth of cut, using the developed procedure, in a range of practical operating conditions and thereby the estimation of the expected accuracy of the method prior to verification of the machined parts....

  14. Basewide Groundwater Operable Unit. Groundwater Operable Unit Remedial Investigation/Feasibility Study Report. Volume 2

    Science.gov (United States)

    1994-06-01

    Waters Plan Protection of Aquatic Life Freshwater Aquatic ULie Protection Freshwater Freshwater 1-Hour CopudAcute Chronic Average 4-Day...2 of 3 ARARs TB~s Clean Water Act Ambient Water Quality Criteria Inland Surface Waters Plan Protection of Aquatic Life Freshwater Aquatic Life...as a drinking water source. Response: The Air Force concurs with the establishment of a 106 risk target volume as the goal of the interim

  15. The use of flow models for design of plant operating procedures

    International Nuclear Information System (INIS)

    Lind, M.

    1982-03-01

    The report describe a systematic approach to the design of operating procedures or sequence automatics for process plant control. It is shown how flow models representing the topology of mass and energy flows on different levels of function provide plant information which is important for the considered design problem. The modelling methodology leads to the definition of three categories of control tasks. Two tasks relate to the regulation and control of changes of levels and flows of mass and energy in a system within a defined mode of operation. The third type relate to the control actions necessary for switching operations involved in changes of operating mode. These control tasks are identified for a given plant as part of the flow modelling activity. It is discussed how the flow model deal with the problem of assigning control task precedence in time eg. during start-up or shut-down operations. The method may be a basis for providing automated procedure support to the operator in unforeseen situations or may be a tool for control design. (auth.)

  16. Operability test procedure for 241-U compressed air system and heat pump

    International Nuclear Information System (INIS)

    Freeman, R.D.

    1994-01-01

    The 241-U-701 compressed air system supplies instrument quality compressed air to Tank Farm 241-U. The supply piping to the 241-U Tank Farm is not included in the modification. Modifications to the 241-U-701 compressed air system include installation of a 15 HP Reciprocating Air Compressor, Ingersoll-Rand Model 10T3NLM-E15; an air dryer, Hankinson, Model DH-45; and miscellaneous system equipment and piping (valves, filters, etc.) to meet the design. A newly installed heat pump allows the compressor to operate within an enclosed relatively dust free atmosphere and keeps the compressor room within a standard acceptable temperature range, which makes possible efficient compressor operation, reduces maintenance, and maximizes compressor operating life. This document is an Operability Test Procedure (OTP) which will further verify (in addition to the Acceptance Test Procedure) that the 241-U-701 compressed air system and heat pump operate within their intended design parameters. The activities defined in this OTP will be performed to ensure the performance of the new compressed air system will be adequate, reliable and efficient. Completion of this OTP and sign off of the OTP Acceptance of Test Results is necessary for turnover of the compressed air system from Engineering to Operations

  17. Cold and compression in the management of musculoskeletal injuries and orthopedic operative procedures: a narrative review

    Directory of Open Access Journals (Sweden)

    Jon E Block

    2010-07-01

    Full Text Available Jon E BlockJon E Block, PhD., Incorporated, San Francisco, CA, USAAbstract: Cold and compression are routinely applied immediately after acute injury or ­following surgery to alleviate pain, reduce swelling and speed functional recovery. The objective of this literature review is to describe the published clinical findings regarding combined cold and compression therapy in the management of musculoskeletal injuries and after orthopedic operative procedures. Of 33 potential articles triaged, the findings of 21 randomized controlled trials were assessed and summarized. The findings reported by these 21 studies were largely subjective pain outcomes and, to a lesser degree, swelling and range of motion, and were inconsistent and divergent, making it difficult to recommend the most appropriate, effective clinical application of cold and compression. Further, 18 of the 21 reported studies evaluated cold and static compression, where the extent and duration of the compression was not uniform within or across studies. Operative procedures may offer a more controlled environment for rigorous investigations. However, such studies must be powered sufficiently to account for variations in surgical procedure that could affect outcomes. More uniform operative procedures, such as total knee arthroplasty, represent a well circumscribed intervention for studying the clinical utility of cold compression therapy because the operative technique is standardized, surgical tissue damage is extensive, intraoperative blood loss is high, and post-operative edema and pain are severe. Findings from randomized controlled trials of knee arthroplasty generally showed cold compression therapy provides better outcomes such as pain relief than alternative interventions. While the effects of cold and static compression are clearly better than no treatment, they do not appear to be directly additive.Keywords: cryotherapy, injury

  18. The economics of plastic surgery practices: trends in income, procedure mix, and volume.

    Science.gov (United States)

    Krieger, Lloyd M; Lee, Gordon K

    2004-07-01

    Anecdotally, plastic surgeons have complained of working harder for the same or less income in recent years. They also complain of falling fees for reconstructive surgery and increasing competition for cosmetic surgery. This study examined these notions using the best available data. To gain a better understanding of the current plastic surgery market, plastic surgeon incomes, fees, volume, and relative mix of cosmetic and reconstructive surgery were analyzed between the years 1992 and 2002. To gain a broader perspective, plastic surgeon income trends were then compared with those of other medical specialties and of nonmedical professions. The data show that in real dollars, plastic surgeon incomes have remained essentially steady in recent years, despite plastic surgeons increasing their surgery load by an average of 41 percent over the past 10 years. The overall income trend is similar to that of members of other medical specialties and other nonmedical professionals. The average practice percentage of cosmetic surgery was calculated and found to have increased from 27 percent in 1992 to 58 percent in 2002. This most likely can be explained by the findings that real dollar fees collected for cosmetic surgery have decreased very slightly, whereas those for reconstructive procedures have experienced sharp declines. This study demonstrates that plastic surgeons have adjusted their practice profiles in recent years. They have increased their case loads and shifted their practices toward cosmetic surgery, most likely with the goal of maintaining their incomes. The strategy appears to have been successful in the short term. However, with increasing competition and falling prices for cosmetic surgery, it may represent a temporary bulwark for plastic surgeon incomes unless other steps are taken.

  19. TVT-Exact and midurethral sling (SLING-IUFT) operative procedures: a randomized study.

    Science.gov (United States)

    Aniuliene, Rosita; Aniulis, Povilas; Skaudickas, Darijus

    2015-01-01

    The aim of the study is to compare results, effectiveness and complications of TVT exact and midurethral sling (SLING-IUFT) operations in the treatment of female stress urinary incontinence (SUI). A single center nonblind, randomized study of women with SUI who were randomized to TVT-Exact and SLING-IUFT was performed by one surgeon from April 2009 to April 2011. SUI was diagnosed on coughing and Valsalva test and urodynamics (cystometry and uroflowmetry) were assessed before operation and 1 year after surgery. This was a prospective randomized study. The follow up period was 12 months. 76 patients were operated using the TVT-Exact operation and 78 patients - using the SLING-IUFT operation. There was no statistically significant differences between groups for BMI, parity, menopausal status and prolapsed stage (no patients had cystocele greater than stage II). Mean operative time was significantly shorter in the SLING-IUFT group (19 ± 5.6 min.) compared with the TVT-Exact group (27 ± 7.1 min.). There were statistically significant differences in the effectiveness of both procedures: TVT-Exact - at 94.5% and SLING-IUFT - at 61.2% after one year. Hospital stay was statistically significantly shorter in the SLING-IUFT group (1. 2 ± 0.5 days) compared with the TVT-Exact group (3.5 ± 1.5 days). Statistically significantly fewer complications occurred in the SLING-IUFT group. the TVT-Exact and SLING-IUFT operations are both effective for surgical treatment of female stress urinary incontinence. The SLING-IUFT involved a shorter operation time and lower complications rate., the TVT-Exact procedure had statistically significantly more complications than the SLING-IUFT operation, but a higher effectiveness.

  20. Safety evaluation by living probabilistic safety assessment. Procedures and applications for planning of operational activities and analysis of operating experience

    International Nuclear Information System (INIS)

    Johanson, Gunnar; Holmberg, J.

    1994-01-01

    Living Probabilistic Safety Assessment (PSA) is a daily safety management system and it is based on a plant-specific PSA and supporting information systems. In the living use of PSA, plant status knowledge is used to represent actual plant safety status in monitoring or follow-up perspective. The PSA model must be able to express the risk at a given time and plant configuration. The process, to update the PSA model to represent the current or planned configuration and to use the model to evaluate and direct the changes in the configuration, is called living PSA programme. The main purposes to develop and increase the usefulness of living PSA are: Long term safety planning: To continue the risk assessment process started with the basic PSA by extending and improving the basic models and data to provide a general risk evaluation tool for analyzing the safety effects of changes in plant design and procedures. Risk planning of operational activities: To support the operational management by providing means for searching optimal operational maintenance and testing strategies from the safety point of view. The results provide support for risk decision making in the short term or in a planning mode. The operational limits and conditions given by technical specifications can be analyzed by evaluating the risk effects of alternative requirements in order to balance the requirements with respect to operational flexibility and plant economy. Risk analysis of operating experience: To provide a general risk evaluation tool for analyzing the safety effects of incidents and plant status changes. The analyses are used to: identify possible high risk situations, rank the occurred events from safety point of view, and get feedback from operational events for the identification of risk contributors. This report describes the methods, models and applications required to continue the process towards a living use of PSA. 19 tabs, 20 figs

  1. Test and evaluation procedures for Sandia's Teraflops Operating System (TOS) on Janus.

    Energy Technology Data Exchange (ETDEWEB)

    Barnette, Daniel Wayne

    2005-10-01

    This report describes the test and evaluation methods by which the Teraflops Operating System, or TOS, that resides on Sandia's massively-parallel computer Janus is verified for production release. Also discussed are methods used to build TOS before testing and evaluating, miscellaneous utility scripts, a sample test plan, and a proposed post-test method for quickly examining the large number of test results. The purpose of the report is threefold: (1) to provide a guide to T&E procedures, (2) to aid and guide others who will run T&E procedures on the new ASCI Red Storm machine, and (3) to document some of the history of evaluation and testing of TOS. This report is not intended to serve as an exhaustive manual for testers to conduct T&E procedures.

  2. Impact of procedure on the post-operative infection risk of patients after elective colon surgery.

    Science.gov (United States)

    Blitzer, David N; Davis, John M; Ahmed, Nasim; Kuo, Yen-Hong; Kuo, Yen-Liang

    2014-12-01

    Post-operative infection impacts the quality of patient care, prolongs the length of hospital stay, and utilizes more health care resources. The purpose of this study was to compare the rates of surgical site infection among three major surgical procedures for treating patients with colon pathology. The location of colon resection impacts the post-operative infection rate. A retrospective cohort study was conducted by using the 2006 Nationwide Inpatient Sample. Adult patients (age ≥18 yr) with colon diseases are the population of interest. The disease status and procedures were categorized according to the International Classification of Diseases, Ninth Revision, Clinical Modification (ICD-9-CM). Patients with a primary diagnosis of diverticulosis of the colon without hemorrhage (ICD-9-CM codes: 562.11 and 562.12) or malignant neoplasm of the colon (ICD-9-CM codes: 153.x, where x represents the possible digits within this ICD-9-CM code category), with procedures of open and other right hemicolectomy (ORH; ICD-9-CM code: 45.73) or open and other left hemicolectomy (OLH; ICD-9-CM code: 45.75), or open and other sigmoidectomy (OS; ICD-9-CM code: 45.76) were included for this study. The primary measured outcome for the study was surgical site infection. There were an estimated 26,381 ORH procedures, 9,558 OLH procedures, and 31,656 OS procedures performed in 2006. There was a significant difference among procedures with respect to their age distributions (mean [standard error]: ORH vs. OLH vs. OS=70.5 [0.2] vs. 63.8 [0.3] vs. 59.5 [0.2] yr, pinfection rates: ORH vs. OLH vs. OS=2.9% vs. 5.6% vs. 4.9%, pinfection for OLH (AOR [95% CI]: 1.31 [1.04-1.64], p=0.02) compared with OS. Different sites of colon operations were associated with different risks of surgical site infections. Accordingly, appropriate pre-operative measures should address these differences.

  3. Evaluating North Carolina Food Pantry Food Safety-Related Operating Procedures.

    Science.gov (United States)

    Chaifetz, Ashley; Chapman, Benjamin

    2015-11-01

    Almost one in seven American households were food insecure in 2012, experiencing difficulty in providing enough food for all family members due to a lack of resources. Food pantries assist a food-insecure population through emergency food provision, but there is a paucity of information on the food safety-related operating procedures used in the pantries. Food pantries operate in a variable regulatory landscape; in some jurisdictions, they are treated equivalent to restaurants, while in others, they operate outside of inspection regimes. By using a mixed methods approach to catalog the standard operating procedures related to food in 105 food pantries from 12 North Carolina counties, we evaluated their potential impact on food safety. Data collected through interviews with pantry managers were supplemented with observed food safety practices scored against a modified version of the North Carolina Food Establishment Inspection Report. Pantries partnered with organized food bank networks were compared with those that operated independently. In this exploratory research, additional comparisons were examined for pantries in metropolitan areas versus nonmetropolitan areas and pantries with managers who had received food safety training versus managers who had not. The results provide a snapshot of how North Carolina food pantries operate and document risk mitigation strategies for foodborne illness for the vulnerable populations they serve. Data analysis reveals gaps in food safety knowledge and practice, indicating that pantries would benefit from more effective food safety training, especially focusing on formalizing risk management strategies. In addition, new tools, procedures, or policy interventions might improve information actualization by food pantry personnel.

  4. Emergency operating procedures guidelines for pressurized water reactors - a progress report

    International Nuclear Information System (INIS)

    Lyon, W.C.

    1984-01-01

    Emergency Operating Procedures (EOPs) contain the instructions the operator will follow to control a nuclear plant whenever a condition exists that potentially jeopardizes the fuel cladding, the reactor coolant system (RCS) pressure boundary, or the containment. The EOPs are prepared from guidelines which contain the major operator instructions that will be in the EOPs. Guidelines have been prepared by owners' groups having Babcock and Wilcox (BandW), Combustion Engineering (CE), General Electric (GE), and Westinghouse (W) plants. These guidelines cover many aspects of full power operation. Future effort is anticipated to complete coverage of transient events, including severe accidents, all power conditions, and shutdown. This paper describes the philosophy which has guided NRC technical review of guidelines, progress achieved in providing comprehensive coverage of emergency conditions for PWRs, and anticipated future technical activities

  5. The importance of production standard operating procedure in a family business company

    Science.gov (United States)

    Hongdiyanto, C.

    2017-12-01

    Plastic industry is a growing sector, therefore UD X which engage in this business has a great potential to grow as well. The problem faced by this family business company is that no standard operating procedure is used and it lead to problem in the quality and quantity produced. This research is aim to create a production standard operating procedure for UD X. Semistructure interview is used to gather information from respondent to help writer create the SOP. There are four SOP’s created, namely: classifying SOP, sorting SOP, milling SOP and packing SOP. Having SOP will improve the effectiveness of production because employees already know how to work in each stages of production process.

  6. Rancang Bangun Document Management System Untuk Mengelola Dokumen Standart Operational Procedure

    Directory of Open Access Journals (Sweden)

    I Putu Susila Handika

    2017-09-01

    Standard Operational Procedure (SOP is one important document in a company because it is useful to improve the quality of the company. PT. Global Retailindo Pratama is one of the companies engaged in retail that using standard of quality management ISO 9001: 2008. Currently the management of SOP documents at PT. Global Retailindo Pratama still use manual way. Manual way cause some problems such as the search process and document distribution process takes quite a long time. This research aims to design and build Document Management System to manage SOP documents. The system development model used in this research is prototyping model. This application is built in web-based with PHP as programming language. Testing the application using Blak Box Testing and Usability Testing shows that the Document Management System can run in accordance with the needs and can be used easily so that the process of document management SOP becomes faster. Keywords: Document Management System, Standart Operational Procedure, Information System, PHP.

  7. Integrated Hatchery Operations Team: Policies and Procedures for Columbia Basin Anadromous Salmonid Hatcheries, 1994 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Integrated Hatchery Operations Team (Northwest Power Planning Council, Portland, OR)

    1995-01-01

    This document outlines regional policies and procedures for hatchery operations in the Columbia River Basin. The purpose of these policies is to provide regional guidelines by which all anadromous fish hatcheries will be operated. These policies will be adopted by the fisheries co-managers, and will provide guidance to operate hatcheries in an efficient and biologically sound manner. The hatchery policies presented in this manual are not intended to establish production priorities. Rather, the intent is to guide hatchery operations once production numbers are established. Hatchery operations discussed in this report include broodstock collection, spawning, incubation of eggs, fish rearing and feeding, fish release, equipment maintenance and operations, and personnel training. Decisions regarding production priorities must be provided by fishery managers through a comprehensive plan that addresses both natural and hatchery fish production. The Integrated Hatchery Operations Team is a multi-agency group called for by the Northwest Power Planning Council. This team was directed to develop new basinwide policies for managing and operating all existing and future anadromous fish hatcheries in the Columbia River Basin. The parties pledge to confer with each other and to use their authorities and resources to accomplish these mutually acceptable hatchery practices.

  8. Chapter 8. Medical procedures. Recommendations and standard operating procedures for intensive care unit and hospital preparations for an influenza epidemic or mass disaster

    NARCIS (Netherlands)

    Zimmerman, Janice L.; Sprung, Charles L.; Christian, Michael D.; Camargo, Ruben; Ceraso, Daniel; Azoulay, Elie; Duguet, Alexandre; Guery, Benoit; Reinhart, Konrad; Adini, Bruria; Barlavie, Yaron; Benin-Goren, Odeda; Cohen, Robert; Klein, Motti; Leoniv, Yuval; Margalit, Gila; Rubinovitch, Bina; Sonnenblick, Moshe; Steinberg, Avraham; Weissman, Charles; Wolff, Donna; Kesecioglu, Jozef; de Jong, Menno; Moreno, Rui; An, Youzhong; Du, Bin; Joynt, Gavin M.; Colvin, John; Loo, Shi; Richards, Guy; Artigas, Antonio; Pugin, Jerome; Amundson, Dennis; Devereaux, Asha; Beigel, John; Danis, Marion; Farmer, Chris; Hick, John L.; Maki, Dennis; Masur, Henry; Rubinson, Lewis; Sandrock, Christian; Talmor, Daniel; Truog, Robert; Zimmerman, Janice; Brett, Steve; Montgomery, Hugh; Rhodes, Andrew; Sanderson, Frances; Taylor, Bruce

    2010-01-01

    To provide recommendations and standard operating procedures for intensive care unit and hospital preparations for an influenza pandemic or mass disaster with a specific focus on ensuring that adequate resources are available and appropriate protocols are developed to safely perform procedures in

  9. Data management tools and operational procedures in ATLAS : Example of the German cloud

    International Nuclear Information System (INIS)

    Serfon, Cedric

    2010-01-01

    A set of tools have been developed to ensure the Data Management operations (deletion, consistency checks) within the German cloud for ATLAS. These tools are described hereafter and presented in the context of the operational procedures of the German cloud. A particular emphasis is put on the consistency checks between the different catalogs (LFC, DQ2 Central Catalogs) and the files stored on the Storage Element. These consistency checks are crucial to be sure that all the data stored in the sites are actually available for the users and to get rid of non registered files also known as Dark Data.

  10. Procedure for estimating nonfuel operation and maintenance costs for large steam-electric power plants

    International Nuclear Information System (INIS)

    Myers, M.L.; Fuller, L.C.

    1979-01-01

    Revised guidelines are presented for estimating annual nonfuel operation and maintenance costs for large steam-electric power plants, specifically light-water-reactor plants and coal-fired plants. Previous guidelines were published in October 1975 in ERDA 76-37, a Procedure for Estimating Nonfuel Operating and Maintenance Costs for Large Steam-Electric Power Plants. Estimates for coal-fired plants include the option of limestone slurry scrubbing for flue gas desulfurization. A computer program, OMCOST, is also presented which covers all plant options

  11. An independent safety assessment of Department of Energy nuclear reactor facilities: Procedures, operations and maintenance

    International Nuclear Information System (INIS)

    Toto, G.; Lindgren, A.J.

    1981-02-01

    The 1979 accident at the Three Mile Island commercial nuclear power plant has led to a number of studies of nuclear reactors, in both the public and private sectors. One of these is that of the Department of Energy's (DOE) Nuclear Facilities Personnel Qualification and Training (NFPQT) Committee, which has outlined tasks for assessment of 13 reactors owned by DOE and operated by contractors. This report covers one of the tasks, the assessment of procedures, operations, and maintenance at the DOE reactor facilities, based on a review of actual documents used at the reactor sites

  12. Measurement of spatial dose distribution for evaluation operator dose during nero-interventional procedures

    International Nuclear Information System (INIS)

    Han, Su Chul; Hong, Dong Hee

    2016-01-01

    The spatial dose distribution was measured with ionization chamber as preliminary study to evaluate operator dose and to study dose reduction during neuro-interventional procedures. The zone of operators was divided into four area (45, 135, 225, and 315 degree).We supposed that operator exist on the four area and indicated location of critical organs(eyes, breast, gonad). The spatial doses were measured depending on distance( 80, 100, 120, and 140 cm) and location of critical organs. The spatial doses of area of 225 degree were 114.5 mR/h (eyes location), 143.1 mR/h (breast location) and 147 mR/h (gonad location) in 80 cm. When changed location of x-ray generator, spatial dose increased in 18.1±10.5%, averagely. We certified spatial dose in the operator locations, Using the results of this study, It is feasible to protect operator from radiation in neuro-interventional procedures

  13. Measurement of spatial dose distribution for evaluation operator dose during nero-interventional procedures

    Energy Technology Data Exchange (ETDEWEB)

    Han, Su Chul [Division of Medical Radiation Equipment, Korea Institute of Radiological and Medical Sciences, Seoul (Korea, Republic of); Hong, Dong Hee [Dept. of Radiology Science, Far East University, Eumseong (Korea, Republic of)

    2016-09-15

    The spatial dose distribution was measured with ionization chamber as preliminary study to evaluate operator dose and to study dose reduction during neuro-interventional procedures. The zone of operators was divided into four area (45, 135, 225, and 315 degree).We supposed that operator exist on the four area and indicated location of critical organs(eyes, breast, gonad). The spatial doses were measured depending on distance( 80, 100, 120, and 140 cm) and location of critical organs. The spatial doses of area of 225 degree were 114.5 mR/h (eyes location), 143.1 mR/h (breast location) and 147 mR/h (gonad location) in 80 cm. When changed location of x-ray generator, spatial dose increased in 18.1±10.5%, averagely. We certified spatial dose in the operator locations, Using the results of this study, It is feasible to protect operator from radiation in neuro-interventional procedures.

  14. Assisting emergency operating procedures execution with AMAS, an Accident Management Advisor System

    International Nuclear Information System (INIS)

    Guarro, S.; Milici, T.; Wu, J.S.; Apostolakis, G.

    2004-01-01

    In an accident situation, because any decisions that the operators make will depend on how instrumentation readings are ultimately interpreted, the issue of instrument uncertainty is of paramount importance. This uncertainty exists because instrument readings may not be available in the desired form - i.e., only indirect readings for a parameter of interest may exist, with uncertainty on which physical models may be used to deduce its value from these indirect indications -, or because readings may be coming from instruments whose accuracy and reliability in the face of the severe conditions produced by the accident are far from what may be expected under normal operating conditions. In following the EOPs, the operators must rely on instrumentation whose readings may not reflect the real situation. The Accident Management Advisor System (AMAS) is a decision aid intended to supplement plant Emergency Operating Procedures (EOPs) by accounting for instrumentation uncertainty, and by alerting the operators if they are on the wrong procedures, or otherwise performing an action that is not optimal in terms of preventing core damage. In AMAS, the availability and reliability of certain important instrument readings is treated in probabilistic, rather than deterministic terms. This issue is discussed in greater detail later in the paper, since it relates to one of the key characteristics of the AMAS decision aid. (author)

  15. A note on the implementation of variational procedures involving Green's operators

    Energy Technology Data Exchange (ETDEWEB)

    Blakemore, M; Evans, G A; Hyslop, J

    1975-12-01

    The numerical implementation of a minimum energy principle for atoms and molecules involving integral operators is discussed. It is demonstrated that the use of unscaled trial functions may be as convenient computationally as the earlier procedures involving scaled trial functions and that the revised prescription has advantages, mainly in ease of interpretation and comparison of results. By way of illustration, some earlier calculations on the hydrogen ion are reconsidered and compared. (auth)

  16. Mental workload measurement for emergency operating procedures in digital nuclear power plants.

    Science.gov (United States)

    Gao, Qin; Wang, Yang; Song, Fei; Li, Zhizhong; Dong, Xiaolu

    2013-01-01

    Mental workload is a major consideration for the design of emergency operation procedures (EOPs) in nuclear power plants. Continuous and objective measures are desired. This paper compares seven mental workload measurement methods (pupil size, blink rate, blink duration, heart rate variability, parasympathetic/sympathetic ratio, total power and (Goals, Operations, Methods, and Section Rules)-(Keystroke Level Model) GOMS-KLM-based workload index) with regard to sensitivity, validity and intrusiveness. Eighteen participants performed two computerised EOPs of different complexity levels, and mental workload measures were collected during the experiment. The results show that the blink rate is sensitive to both the difference in the overall task complexity and changes in peak complexity within EOPs, that the error rate is sensitive to the level of arousal and correlate to the step error rate and that blink duration increases over the task period in both low and high complexity EOPs. Cardiac measures were able to distinguish tasks with different overall complexity. The intrusiveness of the physiological instruments is acceptable. Finally, the six physiological measures were integrated using group method of data handling to predict perceived overall mental workload. The study compared seven measures for evaluating the mental workload with emergency operation procedure in nuclear power plants. An experiment with simulated procedures was carried out, and the results show that eye response measures are useful for assessing temporal changes of workload whereas cardiac measures are useful for evaluating the overall workload.

  17. Department of Defense Financial Management Regulation. Volume 13. Nonappropriated Funds Policy and Procedures

    National Research Council Canada - National Science Library

    1994-01-01

    .... In addition, it directs statutory and regulatory financial reporting requirements. This Volume prescribes standard accounting principles and practices for all DoD nonappropriated fund instrumentalities (NAFIs...

  18. Relation between task complexity and variability of procedure progression during an emergency operation

    International Nuclear Information System (INIS)

    Kim, Yochan; Park, Jinkyun; Jung, Wondea

    2013-01-01

    Highlights: • The relation between task complexity and the variability of procedure progression was investigated. • The two quantitative measures, TACOM and VPP, were applied to this study. • The task complexity was positively related with the operator’s procedural variability. • The VPP measure can be useful for explaining the operator’s behaviors. - Abstract: In this study, the relation between task complexity and variability of procedure progression during an emergency operation was investigated by comparing the two quantitative measures. To this end, the TACOM measure and VPP measure were applied to evaluate the complexity of tasks and variability of procedure progression, respectively. The TACOM scores and VPP scores were obtained for 60 tasks in the OPERA database, and a correlation analysis between two measures and a multiple regression analysis between the sub-measures of the TACOM measure and VPP measure were conducted. The results showed that the TACOM measure is positively associated with the VPP measure, and the abstraction hierarchy complexity mainly affected the variability among the sub-measures of TACOM. From these findings, it was discussed that the task complexity is related to an operator’s procedural variability and VPP measure can be useful for explaining the operator’s behaviors

  19. Aortic root operations for Marfan syndrome: a comparison of the Bentall and valve-sparing procedures.

    Science.gov (United States)

    Patel, Nishant D; Weiss, Eric S; Alejo, Diane E; Nwakanma, Lois U; Williams, Jason A; Dietz, Harry C; Spevak, Philip J; Gott, Vincent L; Vricella, Luca A; Cameron, Duke E

    2008-06-01

    We compared results of the Bentall procedure with valve-sparing aortic root replacement (VSRR) for aortic root aneurysm in Marfan syndrome. Marfan syndrome patients who had the Bentall procedure or VSRR at our institution between April 1997 and September 2006 were identified. Follow-up information was obtained from hospital charts and contact with patients or their physicians. Kaplan-Meier survival and propensity score analyses were performed. One hundred forty Marfan syndrome patients had either the Bentall procedure (n = 56) or VSRR (n = 84; 40 remodeling and 44 reimplantation). Bentall patients were older than VSRR patients (38 versus 29 years; p = 0.0001) and had more aortic dissections (16% versus 1%; p = 0.0012); more urgent/emergent surgery (20% versus 2%; p = 0.0008); larger preoperative sinus diameter (5.7 versus 5.1 cm; p = 0.0004); and more preoperative 3+/4+ aortic insufficiency (59% versus 10%; p valve replacement was 90% for VSRR patients. Eight-year survival was 90% for Bentall and 100% for VSRR patients (p = 0.01). Propensity-adjusted regression showed that the Bentall procedure did not predict mortality (p = 1.00) and did not protect from reoperation (odds ratio = 0.28; 95% confidence interval: 0.01 to 4.33; p = 0.36). The Bentall procedure and VSRR have similar operative results in Marfan syndrome. The procedures are distinguished by higher rates of thromboembolism among Bentall patients and higher rates of reoperation among VSRR patients. Lower late survival among Bentall patients probably reflects the preferential use of the Bentall procedure for higher risk patients.

  20. Operating history report for the Peach Bottom HTGR. Volume I. Reactor operating history

    International Nuclear Information System (INIS)

    Scheffel, W.J.; Baldwin, N.L.; Tomlin, R.W.

    1976-01-01

    The operating history for the Peach Bottom-1 Reactor is presented for the years 1966 through 1975. Information concerning general chemistry data, general physics data, location of sensing elements in the primary helium circuit, and postirradiation examination and testing of reactor components is presented

  1. CAI and training system for the emergency operation procedure in the advanced thermal reactor, FUGEN

    International Nuclear Information System (INIS)

    Kozaki, T.; Imanaga, K.; Nakamura, S.; Maeda, K.; Sakurai, N.; Miyamoto, M.

    2003-01-01

    In the Advanced Thermal Reactor (ATR ) of the JNC, 'FUGEN', a symptom based Emergency Operating Procedure (EOF) was introduced in order to operate Fugen more safely and it became necessary for the plant operators to master the EOF. However it took a lot of time for the instructor to teach the EOP to operators and to train them. Thus, we have developed a Computer Aided Instruction (CAI) and Training System for the EOP, by which the operators can learn the EOP and can be trained. This system has two major functions, i.e., CAI and training. In the CAI function, there are three learning courses, namely, the EOP procedure, the simulation with guidance and Q and A, and the free simulation. In the training function, all of necessary control instruments (indicators, switches, annunciators and so forth) and physics models for the EOP training are simulated so that the trainees can be trained for all of the EOPs. In addition, 50 kinds of malfunction models are installed in order to perform appropriate accident scenarios for the EOP. The training of the EOP covers the range from AOO (Anticipated Operational Occurrence) to Over-DBAs (Design Based Accidents). This system is built in three personal computers that are connected by the computer network. One of the computers is expected to be used for the instructor and the other two are for the trainees. The EOP is composed of eight guidelines, such as 'Reactor Control' and 'Depression and Cooling', and the operation screens which are corresponded to the guidelines are respectively provided. According to the trial, we have estimated that the efficiency of the learning and the training would be improved about 30% for the trainee and about 75% for the instructor in the actual learning and training. (author)

  2. Large-Scale Multi-Resolution Representations for Accurate Interactive Image and Volume Operations

    KAUST Repository

    Sicat, Ronell B.

    2015-11-25

    The resolutions of acquired image and volume data are ever increasing. However, the resolutions of commodity display devices remain limited. This leads to an increasing gap between data and display resolutions. To bridge this gap, the standard approach is to employ output-sensitive operations on multi-resolution data representations. Output-sensitive operations facilitate interactive applications since their required computations are proportional only to the size of the data that is visible, i.e., the output, and not the full size of the input. Multi-resolution representations, such as image mipmaps, and volume octrees, are crucial in providing these operations direct access to any subset of the data at any resolution corresponding to the output. Despite its widespread use, this standard approach has some shortcomings in three important application areas, namely non-linear image operations, multi-resolution volume rendering, and large-scale image exploration. This dissertation presents new multi-resolution representations for large-scale images and volumes that address these shortcomings. Standard multi-resolution representations require low-pass pre-filtering for anti- aliasing. However, linear pre-filters do not commute with non-linear operations. This becomes problematic when applying non-linear operations directly to any coarse resolution levels in standard representations. Particularly, this leads to inaccurate output when applying non-linear image operations, e.g., color mapping and detail-aware filters, to multi-resolution images. Similarly, in multi-resolution volume rendering, this leads to inconsistency artifacts which manifest as erroneous differences in rendering outputs across resolution levels. To address these issues, we introduce the sparse pdf maps and sparse pdf volumes representations for large-scale images and volumes, respectively. These representations sparsely encode continuous probability density functions (pdfs) of multi-resolution pixel

  3. Generic procedure for designing and implementing plan management systems for space science missions operations

    Science.gov (United States)

    Chaizy, P. A.; Dimbylow, T. G.; Allan, P. M.; Hapgood, M. A.

    2011-09-01

    This paper is one of the components of a larger framework of activities whose purpose is to improve the performance and productivity of space mission systems, i.e. to increase both what can be achieved and the cost effectiveness of this achievement. Some of these activities introduced the concept of Functional Architecture Module (FAM); FAMs are basic blocks used to build the functional architecture of Plan Management Systems (PMS). They also highlighted the need to involve Science Operations Planning Expertise (SOPE) during the Mission Design Phase (MDP) in order to design and implement efficiently operation planning systems. We define SOPE as the expertise held by people who have both theoretical and practical experience in operations planning, in general, and in space science operations planning in particular. Using ESA's methodology for studying and selecting science missions we also define the MDP as the combination of the Mission Assessment and Mission Definition Phases. However, there is no generic procedure on how to use FAMs efficiently and systematically, for each new mission, in order to analyse the cost and feasibility of new missions as well as to optimise the functional design of new PMS; the purpose of such a procedure is to build more rapidly and cheaply such PMS as well as to make the latter more reliable and cheaper to run. This is why the purpose of this paper is to provide an embryo of such a generic procedure and to show that the latter needs to be applied by people with SOPE during the MDP. The procedure described here proposes some initial guidelines to identify both the various possible high level functional scenarii, for a given set of possible requirements, and the information that needs to be associated with each scenario. It also introduces the concept of catalogue of generic functional scenarii of PMS for space science missions. The information associated with each catalogued scenarii will have been identified by the above procedure and

  4. Impact of operator experience and training strategy on procedural outcomes with leadless pacing: Insights from the Micra Transcatheter Pacing Study.

    Science.gov (United States)

    El-Chami, Mikhael; Kowal, Robert C; Soejima, Kyoko; Ritter, Philippe; Duray, Gabor Z; Neuzil, Petr; Mont, Lluis; Kypta, Alexander; Sagi, Venkata; Hudnall, John Harrison; Stromberg, Kurt; Reynolds, Dwight

    2017-07-01

    Leadless pacemaker systems have been designed to avoid the need for a pocket and transvenous lead. However, delivery of this therapy requires a new catheter-based procedure. This study evaluates the role of operator experience and different training strategies on procedural outcomes. A total of 726 patients underwent implant attempt with the Micra transcatheter pacing system (TPS; Medtronic, Minneapolis, MN, USA) by 94 operators trained in a teaching laboratory using a simulator, cadaver, and large animal models (lab training) or locally at the hospital with simulator/demo model and proctorship (hospital training). Procedure success, procedure duration, fluoroscopy time, and safety outcomes were compared between training methods and experience (implant case number). The Micra TPS procedure was successful in 99.2% of attempts and did not differ between the 55 operators trained in the lab setting and the 39 operators trained locally at the hospital (P = 0.189). Implant case number was also not a determinant of procedural success (P = 0.456). Each operator performed between one and 55 procedures. Procedure time and fluoroscopy duration decreased by 2.0% (P = 0.002) and 3.2% (P safety outcomes by training method. Among a large group of operators, implantation success was high regardless of experience. While procedure duration and fluoroscopy times decreased with implant number, complications were low and not associated with case number. Procedure and safety outcomes were similar between distinct training methodologies. © 2017 Wiley Periodicals, Inc.

  5. 33 CFR Appendix D to Part 157 - Example of a Procedure for Dedicated Clean Ballast Tanks Operations

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Example of a Procedure for... ENVIRONMENT RELATING TO TANK VESSELS CARRYING OIL IN BULK Pt. 157, App. D Appendix D to Part 157—Example of a Procedure for Dedicated Clean Ballast Tanks Operations 1. Source. The example procedure for dedicated clean...

  6. Hanford Environmental Information System (HEIS) Operator`s Manual. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Schreck, R.I.

    1991-10-01

    The Hanford Environmental Information System (HEIS) is a consolidated set of automated resources that effectively manage the data gathered during environmental monitoring and restoration of the Hanford Site. The HEIS includes an integrated database that provides consistent and current data to all users and promotes sharing of data by the entire user community. This manual describes the facilities available to the operational user who is responsible for data entry, processing, scheduling, reporting, and quality assurance. A companion manual, the HEIS User`s Manual, describes the facilities available-to the scientist, engineer, or manager who uses the system for environmental monitoring, assessment, and restoration planning; and to the regulator who is responsible for reviewing Hanford Site operations against regulatory requirements and guidelines.

  7. Analysis of remote operating systems for space-based servicing operations. Volume 2: Study results

    Science.gov (United States)

    1985-01-01

    The developments in automation and robotics have increased the importance of applications for space based servicing using remotely operated systems. A study on three basic remote operating systems (teleoperation, telepresence and robotics) was performed in two phases. In phase one, requirements development, which consisted of one three-month task, a group of ten missions were selected. These included the servicing of user equipment on the station and the servicing of the station itself. In phase two, concepts development, which consisted of three tasks, overall system concepts were developed for the selected missions. These concepts, which include worksite servicing equipment, a carrier system, and payload handling equipment, were evaluated relative to the configurations of the overall worksite. It is found that the robotic/teleoperator concepts are appropriate for relatively simple structured tasks, while the telepresence/teleoperator concepts are applicable for missions that are complex, unstructured tasks.

  8. Classifier-ensemble incremental-learning procedure for nuclear transient identification at different operational conditions

    Energy Technology Data Exchange (ETDEWEB)

    Baraldi, Piero, E-mail: piero.baraldi@polimi.i [Dipartimento di Energia - Sezione Ingegneria Nucleare, Politecnico di Milano, via Ponzio 34/3, 20133 Milano (Italy); Razavi-Far, Roozbeh [Dipartimento di Energia - Sezione Ingegneria Nucleare, Politecnico di Milano, via Ponzio 34/3, 20133 Milano (Italy); Zio, Enrico [Dipartimento di Energia - Sezione Ingegneria Nucleare, Politecnico di Milano, via Ponzio 34/3, 20133 Milano (Italy); Ecole Centrale Paris-Supelec, Paris (France)

    2011-04-15

    An important requirement for the practical implementation of empirical diagnostic systems is the capability of classifying transients in all plant operational conditions. The present paper proposes an approach based on an ensemble of classifiers for incrementally learning transients under different operational conditions. New classifiers are added to the ensemble where transients occurring in new operational conditions are not satisfactorily classified. The construction of the ensemble is made by bagging; the base classifier is a supervised Fuzzy C Means (FCM) classifier whose outcomes are combined by majority voting. The incremental learning procedure is applied to the identification of simulated transients in the feedwater system of a Boiling Water Reactor (BWR) under different reactor power levels.

  9. Classifier-ensemble incremental-learning procedure for nuclear transient identification at different operational conditions

    International Nuclear Information System (INIS)

    Baraldi, Piero; Razavi-Far, Roozbeh; Zio, Enrico

    2011-01-01

    An important requirement for the practical implementation of empirical diagnostic systems is the capability of classifying transients in all plant operational conditions. The present paper proposes an approach based on an ensemble of classifiers for incrementally learning transients under different operational conditions. New classifiers are added to the ensemble where transients occurring in new operational conditions are not satisfactorily classified. The construction of the ensemble is made by bagging; the base classifier is a supervised Fuzzy C Means (FCM) classifier whose outcomes are combined by majority voting. The incremental learning procedure is applied to the identification of simulated transients in the feedwater system of a Boiling Water Reactor (BWR) under different reactor power levels.

  10. Thalamic volume deficit contributes to procedural and explicit memory impairment in HIV infection with primary alcoholism comorbidity.

    Science.gov (United States)

    Fama, Rosemary; Rosenbloom, Margaret J; Sassoon, Stephanie A; Rohlfing, Torsten; Pfefferbaum, Adolf; Sullivan, Edith V

    2014-12-01

    Component cognitive and motor processes contributing to diminished visuomotor procedural learning in HIV infection with comorbid chronic alcoholism (HIV+ALC) include problems with attention and explicit memory processes. The neural correlates associated with this constellation of cognitive and motor processes in HIV infection and alcoholism have yet to be delineated. Frontostriatal regions are affected in HIV infection, frontothalamocerebellar regions are affected in chronic alcoholism, and frontolimbic regions are likely affected in both; all three of these systems have the potential of contributing to both visuomotor procedural learning and explicit memory processes. Here, we examined the neural correlates of implicit memory, explicit memory, attention, and motor tests in 26 HIV+ALC (5 with comorbidity for nonalcohol drug abuse/dependence) and 19 age-range matched healthy control men. Parcellated brain volumes, including cortical, subcortical, and allocortical regions, as well as cortical sulci and ventricles, were derived using the SRI24 brain atlas. Results indicated that smaller thalamic volumes were associated with poorer performance on tests of explicit (immediate and delayed) and implicit (visuomotor procedural) memory in HIV+ALC. By contrast, smaller hippocampal volumes were associated with lower scores on explicit, but not implicit memory. Multiple regression analyses revealed that volumes of both the thalamus and the hippocampus were each unique independent predictors of explicit memory scores. This study provides evidence of a dissociation between implicit and explicit memory tasks in HIV+ALC, with selective relationships observed between hippocampal volume and explicit but not implicit memory, and highlights the relevance of the thalamus to mnemonic processes.

  11. Thalamic Volume Deficit Contributes to Procedural and Explicit Memory Impairment in HIV Infection with Primary Alcoholism Comorbidity

    Science.gov (United States)

    Fama, Rosemary; Rosenbloom, Margaret J.; Sassoon, Stephanie A.; Rohlfing, Torsten; Pfefferbaum, Adolf; Sullivan, Edith V.

    2014-01-01

    Component cognitive and motor processes contributing to diminished visuomotor procedural learning in HIV infection with comorbid chronic alcoholism (HIV+ALC) include problems with attention and explicit memory processes. The neural correlates associated with this constellation of cognitive and motor processes in HIV infection and alcoholism have yet to be delineated. Frontostriatal regions are affected in HIV infection, frontothalamocerebellar regions are affected in chronic alcoholism, and frontolimbic regions are likely affected in both; all three of these systems have the potential of contributing to both visuomotor procedural learning and explicit memory processes. Here, we examined the neural correlates of implicit memory, explicit memory, attention, and motor tests in 26 HIV+ALC (5 with comorbidity for nonalcohol drug abuse/dependence) and 19 age-range matched healthy control men. Parcellated brain volumes, including cortical, subcortical, and allocortical regions, as well as cortical sulci and ventricles, were derived using the SRI24 brain atlas. Results indicated that smaller thalamic volumes were associated with poorer performance on tests of explicit (immediate and delayed) and implicit (visuomotor procedural) memory in HIV+ALC. By contrast, smaller hippocampal volumes were associated with lower scores on explicit, but not implicit memory. Multiple regression analyses revealed that volumes of both the thalamus and the hippocampus were each unique independent predictors of explicit memory scores. This study provides evidence of a dissociation between implicit and explicit memory tasks in HIV+ALC, with selective relationships observed between hippocampal volume and explicit but not implicit memory, and highlights the relevance of the thalamus to mnemonic processes. PMID:24421067

  12. Chemistry in water reactors: operating experience and new developments. 2 volumes

    International Nuclear Information System (INIS)

    1994-01-01

    These proceedings of the International conference on chemistry in water reactors (Operating experience and new developments), Volume 1, are divided into 8 sessions bearing on: (session 1) Primary coolant activity, corrosion products (5 conferences), (session 2) Dose reduction (4 conferences), (session 3) New developments (4 conferences), poster session: Primary coolant chemistry (16 posters), (session 4) Decontamination (5 conferences), poster session (2 posters), (session 5) BWR-Operating experience (3 conferences), (session 6) BWR-Modelling of operating experience (4 conferences), (session 7) BWR-Basic studies (4 conferences), (session 8) BWR-New technologies (3 conferences)

  13. Guidelines for target volume definition in post-operative radiotherapy for prostate cancer, on behalf of the EORTC Radiation Oncology Group

    International Nuclear Information System (INIS)

    Poortmans, Philip; Bossi, Alberto; Vandeputte, Katia; Bosset, Mathieu; Miralbell, Raymond; Maingon, Philippe; Boehmer, Dirk; Budiharto, Tom; Symon, Zvi; Bergh, Alfons C.M. van den; Scrase, Christopher; Poppel, Hendrik van; Bolla, Michel

    2007-01-01

    The appropriate application of 3-D conformal radiotherapy, intensity modulated radiotherapy or image guided radiotherapy for patients undergoing post-operative radiotherapy for prostate cancer requires a standardisation of the target volume definition and delineation as well as standardisation of the clinical quality assurance procedures. Recommendations for this are presented on behalf of the European Organisation for Research and Treatment of Cancer (EORTC) Radiation Oncology Group and in addition to the already published guidelines for radiotherapy as the primary treatment

  14. Integrated operations plan for the MFTF-B Mirror Fusion Test Facility. Volume I. Organization plan

    International Nuclear Information System (INIS)

    1981-12-01

    This plan and the accompanying MFTF-B Integrated Operations Plan are submitted in response to UC/LLNL Purchase Order 3883801, dated July 1981. The organization plan also addresses the specific tasks and trade studies directed by the scope of work. The Integrated Operations Plan, which includes a reliability, quality assurance, and safety plan and an integrated logistics plan, comprises the burden of the report. In the first section of this volume, certain underlying assumptions and observations are discussed setting the requirements and limits for organization. Section B presents the recommended structure itself. Section C Device Availability vs Maintenance and Support Efforts and Section D Staffing Levels and Skills provide backup detail and justification. Section E is a trade study on maintenance and support by LLNL staff vs subcontract and Section F is a plan for transitioning from the construction phase into operation. A brief summary of schedules and estimated costs concludes the volume

  15. Assembly, operation and disassembly manual for the Battelle Large Volume Water Sampler (BLVWS)

    International Nuclear Information System (INIS)

    Thomas, V.W.; Campbell, R.M.

    1984-12-01

    Assembly, operation and disassembly of the Battelle Large Volume Water Sampler (BLVWS) are described in detail. Step by step instructions of assembly, general operation and disassembly are provided to allow an operator completely unfamiliar with the sampler to successfully apply the BLVWS to his research sampling needs. The sampler permits concentration of both particulate and dissolved radionuclides from large volumes of ocean and fresh water. The water sample passes through a filtration section for particle removal then through sorption or ion exchange beds where species of interest are removed. The sampler components which contact the water being sampled are constructed of polyvinylchloride (PVC). The sampler has been successfully applied to many sampling needs over the past fifteen years. 9 references, 8 figures

  16. Authorization procedure for the construction and operation of nuclear installations within the EEC member states

    International Nuclear Information System (INIS)

    Didier, J.M.

    1974-12-01

    For Belgium and Luxembourg, the authorization procedure varies according to the class in which the installation concerned falls (assigned according to the degree of hazard involved classes I, II or III). Moreover, separate authorizations are needed, one for construction and another for operation of class I and II installations. With respect to Germany also, two such separate authorizations are needed, but there is no specific procedure relating to the potential extent of hazard involved in the installation concerned. In France, the basic nuclear installations are subject to a special procedure. Furthermore, the construction and operation of these installations are also subject to two separate authorizations. While the latter two authorizations are required in Italy for the main nuclear installations, no system of classified installations exists according to extent of hazard involved. Similar legislation is applicable in the Netherlands. Neither does such a system of classified installations exist in the United Kingdom. Moreover, there is only one single authorization (the site licence), which is successively adapted during construction. On the other hand, in Denmark and Ireland, no detailed legislation has been developed on the subject

  17. Licensing procedure for the construction and operation of nuclear installations within the EEC member states

    International Nuclear Information System (INIS)

    Didier, J.M.

    1976-08-01

    For Belgium and Luxembourg, the authorization procedure varies according to the Class in which the installation concerned falls (assigned according to the degree of hazard involved: Classes I, II or III). Moreover, separate authorizations are needed, one for construction and another for operation of Class I and II installations. With respect to Germany also, two such separate authorization are needed, but there is no specific procedure relating to the potential extent of hazard involved in the installation concerned. In France, the 'basic' nuclear installations are subject to a special procedure. Furthermore, the construction and operation of these installations are also subject to two separate authorizations. While the latter two authorizations are required in Italy for the main nuclear installations, no system of 'classified' installations exists according to extent of hazard involved. Similar legislation is applicable in the Netherlands. Neither does such a system of 'classified' installations exist in the United Kingdom. Moreover, there is only one single authorization (the 'site licence'), which is succesively adapted during construction. On the other hand, in Denmark and Ireland, no detailed legislation has been developed on the subject

  18. A successful approach for the implementation of symptom-based emergency operating procedures for VVER reactors

    International Nuclear Information System (INIS)

    Lhoest, V.; Prior, R.; Pascal, G.

    2000-01-01

    The paper provides an overview of the organization, the progress and the results of the various Emergence Operating Procedure (EOP) development programs for VVER type reactors conducted by Westinghouse so far. The detailed working process is presented through the solutions to some major plant issues. The EOPs have been developed for the Temelin, Dukovany, Bohunice, Mochovce and Paks VVER nuclear power plants. The procedures are developed in working teams of experts from the utility and Westinghouse. The completion of the programs constitute an indication of the overall success of this approach. This is further reinforced by the general acceptance of the new procedures by the plant personnel, together with the good results obtained so far from procedure testing. This is also confirmed by a new PSA-level 1 analysis for Dukovany plant, which shows a significant improvement in the overall plant safety. This means a 20% reduction in the Core Damage Frequency due to the introduction of the new EOPs. The fact that some modifications have been implemented to the plants to solve design weaknesses identified in the course of this programs also constitute a positive result

  19. High procedure volume is strongly associated with improved survival after lung cancer surgery

    DEFF Research Database (Denmark)

    Lüchtenborg, Margreet; Riaz, Sharma P; Coupland, Victoria H

    2013-01-01

    Studies have reported an association between hospital volume and survival for non-small-cell lung cancer (NSCLC). We explored this association in England, accounting for case mix and propensity to resect....

  20. Procedure guide of design, construction of prototypes, calibration and sure operation of nucleonic control systems

    International Nuclear Information System (INIS)

    Banados Perez, H.; Griffith Martinez, J.; Desdin Garcia, L.F.; Rodriguez Cardona, R.L.; Molina, G.; Sebastian Calvo, C.

    1999-01-01

    This Guide was elaborated in the mark of the project RLA/8/024 ARCAL XLII 'Industrial Applications of the Tracer Technology and Nucleonic Control Systems'. Its objective is to establish the approaches for the design, the construction, the selection and the procedures for the sure operation of the Nucleonic Control Systems (NCS) in the industry. The NCS is used to control processes to high speeds, materials with extreme conditions or with noxious chemical properties, susceptible materials of being damaged by contact and packed products. In this document is defined the scope of the procedure. The SCN are classified according to: type of radiations, the mobility of the components, the degree of the beams collimation; and in function of the security. The design and construction criteria of the nuclear meters and of the systems of control nucleonic are exposed

  1. Short Operative Duration and Surgical Site Infection Risk in Hip and Knee Arthroplasty Procedures.

    Science.gov (United States)

    Dicks, Kristen V; Baker, Arthur W; Durkin, Michael J; Anderson, Deverick J; Moehring, Rebekah W; Chen, Luke F; Sexton, Daniel J; Weber, David J; Lewis, Sarah S

    2015-12-01

    To determine the association (1) between shorter operative duration and surgical site infection (SSI) and (2) between surgeon median operative duration and SSI risk among first-time hip and knee arthroplasties. Retrospective cohort study A total of 43 community hospitals located in the southeastern United States. Adults who developed SSIs according to National Healthcare Safety Network criteria within 365 days of first-time knee or hip arthroplasties performed between January 1, 2008 and December 31, 2012. Log-binomial regression models estimated the association (1) between operative duration and SSI outcome and (2) between surgeon median operative duration and SSI outcome. Hip and knee arthroplasties were evaluated in separate models. Each model was adjusted for American Society of Anesthesiology score and patient age. A total of 25,531 hip arthroplasties and 42,187 knee arthroplasties were included in the study. The risk of SSI in knee arthroplasties with an operative duration shorter than the 25th percentile was 0.40 times the risk of SSI in knee arthroplasties with an operative duration between the 25th and 75th percentile (risk ratio [RR], 0.40; 95% confidence interval [CI], 0.38-0.56; Poperative duration did not demonstrate significant association with SSI for hip arthroplasties (RR, 1.04; 95% CI, 0.79-1.37; P=.36). Knee arthroplasty surgeons with shorter median operative durations had a lower risk of SSI than surgeons with typical median operative durations (RR, 0.52; 95% CI, 0.43-0.64; Poperative durations were not associated with a higher SSI risk for knee or hip arthroplasty procedures in our analysis.

  2. An ergonomics study of computerized emergency operating procedures: Presentation style, task complexity, and training level

    International Nuclear Information System (INIS)

    Xu Song; Song Fei; Li Zhizhong; Zhao Qianyi; Luo Wei; He Xuhong; Salvendy, Gavriel

    2008-01-01

    Emergency operating procedures (EOPs) are widely used in nuclear power plants (NPPs). With the development of information technology, computerized EOPs are taking the place of paper-based ones. Unlike paper-based EOPs, the industrial practice of computerized EOPs is still quite limited. Ergonomics issues of computerized EOPs have not been studied adequately. This study focuses on the effects of EOP presentation style, task complexity, and training level on the performance of the operators in the execution of computerized EOPs. One simulated computerized EOP system was developed to present two EOPs, each with different task complexity levels, by two presentation styles (Style A: one- and two-dimensional flowcharts combination; Style B: two-dimensional flowchart and success logic tree combination). Forty subjects participated in the experiment of EOP execution using the simulated system. Statistical analysis of the experimental results indicates that: (1) complexity, presentation style, and training level all can significantly influence the error rate. High-complexity tasks and lack of sufficient training may lead to a higher error rate. Style B caused a significantly higher error rate than style A did in the skilled phase. So the designers of computerized procedures should take the presentation styles of EOPs into account. (2) Task complexity and training level can significantly influence operation time. No significant difference was found in operation time between the two presentation styles. (3) Training level can also significantly influence the subjective workload of EOPs operations. This implies that adequate training is very important for the performance of computerized EOPs even if emergency responses with computerized EOPs are much more simple and easy than that with paper-based EOPs

  3. An ergonomics study of computerized emergency operating procedures: Presentation style, task complexity, and training level

    Energy Technology Data Exchange (ETDEWEB)

    Xu Song; Song Fei [Department of Industrial Engineering, Tsinghua University, Beijing 100084 (China); Li Zhizhong [Department of Industrial Engineering, Tsinghua University, Beijing 100084 (China)], E-mail: zzli@tsinghua.edu.cn; Zhao Qianyi; Luo Wei [Department of Industrial Engineering, Tsinghua University, Beijing 100084 (China); He Xuhong [Scanpower Risk Management China Inc., Towercrest International Plaza, No. 3 Maizidian West Road, Chaoyang District, Beijing 100016 (China); Salvendy, Gavriel [Department of Industrial Engineering, Tsinghua University, Beijing 100084 (China)

    2008-10-15

    Emergency operating procedures (EOPs) are widely used in nuclear power plants (NPPs). With the development of information technology, computerized EOPs are taking the place of paper-based ones. Unlike paper-based EOPs, the industrial practice of computerized EOPs is still quite limited. Ergonomics issues of computerized EOPs have not been studied adequately. This study focuses on the effects of EOP presentation style, task complexity, and training level on the performance of the operators in the execution of computerized EOPs. One simulated computerized EOP system was developed to present two EOPs, each with different task complexity levels, by two presentation styles (Style A: one- and two-dimensional flowcharts combination; Style B: two-dimensional flowchart and success logic tree combination). Forty subjects participated in the experiment of EOP execution using the simulated system. Statistical analysis of the experimental results indicates that: (1) complexity, presentation style, and training level all can significantly influence the error rate. High-complexity tasks and lack of sufficient training may lead to a higher error rate. Style B caused a significantly higher error rate than style A did in the skilled phase. So the designers of computerized procedures should take the presentation styles of EOPs into account. (2) Task complexity and training level can significantly influence operation time. No significant difference was found in operation time between the two presentation styles. (3) Training level can also significantly influence the subjective workload of EOPs operations. This implies that adequate training is very important for the performance of computerized EOPs even if emergency responses with computerized EOPs are much more simple and easy than that with paper-based EOPs.

  4. The step complexity measure for emergency operating procedures - comparing with simulation data

    International Nuclear Information System (INIS)

    Park, Jinkyun; Jung, Wondea; Kim, Jaewhan; Ha, Jaejoo; Shin, Yunghwa

    2001-01-01

    In complex systems, such as nuclear power plants (NPPs) or airplane control systems, human errors play a major role in many accidents. Therefore, to prevent occurrences of accidents or to ensure system safety, extensive effort has been made to identify significant factors that cause human errors. According to related studies, written manuals or operating procedures are revealed as one of the most important factors, and complexity or understandability of a procedure is pointed out as one of the major reasons that make procedure-related human errors. Many qualitative checklists are suggested to evaluate emergency operating procedures (EOPs) of NPPs. However, since qualitative evaluations using checklists have some drawbacks, a quantitative measure that can quantify the complexity of EOPs is imperative to compensate for them. In order to quantify the complexity of EOPs, Park et al. suggested the step complexity (SC) measure to quantify the complexity of a step included in EOPs. In this paper, to ensure the appropriateness of the SC measure, SC scores are compared with averaged step performance time data obtained from emergency training records. The total number of available records is 36, and training scenarios are the loss of coolant accident and the excess steam dump event. The number of scenario is 18 each. From these emergency training records, step performance time data for 39 steps are retrieved, and they are compared with estimated SC scores of them. In addition, several questions that are needed to clarify the appropriateness of the SC measure are also discussed. As a result, it was observed that estimated SC scores and step performance time data have a statistically meaningful correlation. Thus, it can be concluded that the SC measure can quantify the complexity of steps included in EOPs

  5. Concept for a Satellite-Based Advanced Air Traffic Management System : Volume 4. Operational Description and Qualitative Assessment.

    Science.gov (United States)

    1974-02-01

    The volume presents a description of how the Satellite-Based Advanced Air Traffic Management System (SAATMS) operates and a qualitative assessment of the system. The operational description includes the services, functions, and tasks performed by the...

  6. A decision support system for identifying abnormal operating procedures in a nuclear power plant

    International Nuclear Information System (INIS)

    Hsieh, Min-Han; Hwang, Sheue-Ling; Liu, Kang-Hong; Liang, Sheau-Farn Max; Chuang, Chang-Fu

    2012-01-01

    Highlights: ► A decision support system has been constructed and verified. ► The operator's decision-making time was decreased by about 25%. ► The accuracy was increased by about 18%. ► The system prevents overlooking important information. ► Fewer erroneous solutions were implemented, and the mental workload was reduced. - Abstract: In order to prevent safety hazards that can result from inappropriate decisions made by the operators of a nuclear power plant (NPP), this study was undertaken to develop a decision support system to reduce the complexity of the decision-making process by aiding operators’ cognitive activities, integrating unusual symptoms, and identifying the most suitable abnormal operating procedure (AOP) for operators. The study was conducted from the perspective of human factors engineering in order to compare the process that operators originally used to select an AOP with a process that included a support system for AOP identification. The results of the study indicated that the existence of a support system reduces errors by quickly suggesting likely AOPs. With such a support system in place, there were clear improvements in human performance, i.e., decision-making time decreased by about 25%, and the accuracy of the operators’ decisions, judged by the successful resolution of specific problems, increased by about 18%. In addition, there were fewer erroneous solutions implemented, and the mental workload was reduced. Hence, the decision support system is proposed as a training tool in identifying AOPs in the main control room (MCR).

  7. Minimally Invasive Catheter Procedures to Assist Complicated Pacemaker Lead Extraction and Implantation in the Operating Room

    International Nuclear Information System (INIS)

    Kröpil, Patric; Lanzman, Rotem S.; Miese, Falk R.; Blondin, Dirk; Winter, Joachim; Scherer, Axel; Fürst, Günter

    2011-01-01

    We report on percutaneous catheter procedures in the operating room (OR) to assist complicated manual extraction or insertion of pacemaker (PM) and implantable cardioverter defibrillator leads. We retrospectively reviewed complicated PM revisions and implantations performed between 2004 and 2009 that required percutaneous catheter procedures performed in the OR. The type of interventional procedure, catheter and retrieval system used, venous access, success rates, and procedural complications were analyzed. In 41 (12 female and 29 male [mean age 62 ± 17 years]) of 3021 (1.4%) patients, standard manual retrieval of old leads or insertion of new leads was not achievable and thus required percutaneous catheter intervention for retrieval of misplaced leads and/or recanalisation of occluded central veins. Thirteen of 18 (72.2%) catheter-guided retrieval procedures for misplaced (right atrium [RA] or ventricle [RV; n = 3], superior vena cava [n = 2], brachiocephalic vein [n = 5], and subclavian vein [n = 3]) lead fragments in 16 patients were successful. Percutaneous catheter retrieval failed in five patients because there were extremely fixed or adhered lead fragments. Percutaneous transluminal angiography (PTA) of central veins for occlusion or high-grade stenosis was performed in 25 patients. In 22 of 25 patients (88%), recanalization of central veins was successful, thus enabling subsequent lead replacement. Major periprocedural complications were not observed. In the case of complicated manual PM lead implantation or revision, percutaneous catheter-guided extraction of misplaced lead fragments or recanalisation of central veins can be performed safely in the OR, thus enabling subsequent implantation or revision of PM systems in the majority of patients.

  8. Systematic Procedure for Integrated Process Operation: Reverse Electro-Enhanced Dialysis (REED) during Lactic Acid Fermentation

    DEFF Research Database (Denmark)

    Prado Rubio, Oscar Andres; Jørgensen, Sten Bay; Jonsson, Gunnar Eigil

    2011-01-01

    The integration of lactic acid fermentation and Reverse Electro-Enhanced Dialysis (REED) is investigated based upon previously developed mathematical models. A goal driven process and operation design procedure is proposed and partially investigated. The conceptual analysis of the processes...... integration shows the need for an additional pH controller in the fermenten A PI controller is implemented and tested. The complete control structure for the integrated system consists of this PI controller in the fermenter plus a previously developed (Prado-Rubio et al., 2010) input resetting control...

  9. Test Operations Procedure (TOP) 08-2-188 Chemical Point Detector Vapor Testing

    Science.gov (United States)

    2018-04-27

    Final 3. DATES COVERED (From - To) 4. TITLE AND SUBTITLE Test Operations Procedure (TOP) 08-2-188 Chemical Point Detector Vapor Testing 5a. CONTRACT...NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING...ORGANIZATION NAME(S) AND ADDRESS(ES) US Army Dugway Proving Ground West Desert Test Center (TEDT-DPW) Dugway, UT 84022-5000 8. PERFORMING ORGANIZATION

  10. Windows Calorimeter Control (WinCal) system configuration control board (SCCB) operating procedure

    International Nuclear Information System (INIS)

    Westsik, G.A.

    1997-01-01

    This document describes the operating procedure for the System Configuration Control Board (SCCB) performed in support of the Windows Calorimeter Control (WinCal) system. This board will consist of representatives from Babcock and Wilcox Hanford Company Babcock and Wilcox Protec, Inc.; and Lockheed Martin Services, Inc. In accordance with agreements for the joint use of the Babcock and Wilcox Hanford Company calorimeters located in the Hanford Site Plutonium Finishing Plant (PFP) Nondestructive Assay Laboratory, concurrence regarding changes to the WinCal system will be obtained from the International Atomic Energy Agency (IAEA). Further, changes to the WinCal software will be communicated to Los Alamos National Laboratory

  11. Operating procedures for the manufacture of radioactive SYNROC in the actinide laboratory

    International Nuclear Information System (INIS)

    Western, K.F.

    1986-03-01

    The purpose of this manual is to acquaint the operator with the procedures required to manufacture SYNROC-containing radioactive materials in the SYNROC actinide laboratory, Lucas Heights Research Laboratories. The actinide-doped SYNROC production facility is a series of four interconnected glove boxes and one free-standing glove box. The samples of radioactive SYNROC produced in the actinide laboratory are used to carry out physical testing of the product at various laboratories on site, e.g. leach testing, auto-radiographic examination, electron-microscopc examination, atomic absorption spectrophotometry and analysis

  12. Safety and application of procedures or: how do ''they'' have to use operating procedures in nuclear power plants

    International Nuclear Information System (INIS)

    Dien, Y.

    1993-03-01

    Emergency procedures are inescapable aspects of safety. They can be seen as the laws to be respected in an accident situation. But as for all laws, there remains the problem of their application: should strict adherence to the procedure be imposed under all circumstances. Is this possible. Are there any potential risks with such a requirement. Or, on the contrary, should application be more ''open'', more flexible, allowing for adaptation to the actual situation. But what are the potential risks involved in this approach. Are these two approaches to the application of procedures mutually exclusive, or are they complementary. This paper analyzes the nature of the problem of application of procedures and proposes orientations for further thought on the matter. (author). 11 refs

  13. Operational circular No.10 – Principles and procedures governing investigation of fraud

    CERN Multimedia

    2013-01-01

    Operational Circular No. 10 entitled “Principles and procedures governing investigation of Fraud”, approved by the Director-General following discussion at the Standing Concertation Committee meeting of 4 December 2012 and entering into force on 1 January 2013, is available on the intranet site of the Human Resources Department.   This circular is applicable to all persons working at or on behalf of CERN. The purpose of this new operational circular is to specify the definition of fraud and to lay down the Organization’s fraud investigation process pursuant to the CERN Anti-fraud Policy and in accordance with the principles of due process. Department Head Office HR Department

  14. Simulation model for wind energy storage systems. Volume II. Operation manual. [SIMWEST code

    Energy Technology Data Exchange (ETDEWEB)

    Warren, A.W.; Edsinger, R.W.; Burroughs, J.D.

    1977-08-01

    The effort developed a comprehensive computer program for the modeling of wind energy/storage systems utilizing any combination of five types of storage (pumped hydro, battery, thermal, flywheel and pneumatic). An acronym for the program is SIMWEST (Simulation Model for Wind Energy Storage). The level of detail of SIMWEST is consistent with a role of evaluating the economic feasibility as well as the general performance of wind energy systems. The software package consists of two basic programs and a library of system, environmental, and load components. Volume II, the SIMWEST operation manual, describes the usage of the SIMWEST program, the design of the library components, and a number of simple example simulations intended to familiarize the user with the program's operation. Volume II also contains a listing of each SIMWEST library subroutine.

  15. Exact finite volume expectation values of local operators in excited states

    Energy Technology Data Exchange (ETDEWEB)

    Pozsgay, B. [MTA-BME “Momentum” Statistical Field Theory Research Group,Budafoki út 8, 1111 Budapest (Hungary); Szécsényi, I.M. [Department of Mathematical Sciences, Durham University, South Road, Durham, DH1 3LE (United Kingdom); Institute of Theoretical Physics, Eötvös Loránd University,Pázmány Péter sétány 1/A, 1117 Budapest (Hungary); Takács, G. [MTA-BME “Momentum” Statistical Field Theory Research Group,Budafoki út 8, 1111 Budapest (Hungary); Department of Theoretical Physics, Budapest University of Technology and Economics,Budafoki út 8, 1111 Budapest (Hungary)

    2015-04-07

    We present a conjecture for the exact expression of finite volume expectation values in excited states in integrable quantum field theories, which is an extension of an earlier conjecture to the case of general diagonal factorized scattering with bound states and a nontrivial bootstrap structure. The conjectured expression is a spectral expansion which uses the exact form factors and the excited state thermodynamic Bethe Ansatz as building blocks. The conjecture is proven for the case of the trace of the energy-moment tensor. Concerning its validity for more general operators, we provide numerical evidence using the truncated conformal space approach. It is found that the expansion fails to be well-defined for small values of the volume in cases when the singularity structure of the TBA equations undergoes a non-trivial rearrangement under some critical value of the volume. Despite these shortcomings, the conjectured expression is expected to be valid for all volumes for most of the excited states, and as an expansion above the critical volume for the rest.

  16. Finite-volume effects due to spatially non-local operators arXiv

    CERN Document Server

    Briceño, Raúl A.; Hansen, Maxwell T.; Monahan, Christopher J.

    Spatially non-local matrix elements are useful lattice-QCD observables in a variety of contexts, for example in determining hadron structure. To quote credible estimates of the systematic uncertainties in these calculations, one must understand, among other things, the size of the finite-volume effects when such matrix elements are extracted from numerical lattice calculations. In this work, we estimate finite-volume effects for matrix elements of non-local operators, composed of two currents displaced in a spatial direction by a distance $\\xi$. We find that the finite-volume corrections depend on the details of the matrix element. If the external state is the lightest degree of freedom in the theory, e.g.~the pion in QCD, then the volume corrections scale as $ e^{-m_\\pi (L- \\xi)} $, where $m_\\pi$ is the mass of the light state. For heavier external states the usual $e^{- m_\\pi L}$ form is recovered, but with a polynomial prefactor of the form $L^m/|L - \\xi|^n$ that can lead to enhanced volume effects. These ...

  17. Exact finite volume expectation values of local operators in excited states

    International Nuclear Information System (INIS)

    Pozsgay, B.; Szécsényi, I.M.; Takács, G.

    2015-01-01

    We present a conjecture for the exact expression of finite volume expectation values in excited states in integrable quantum field theories, which is an extension of an earlier conjecture to the case of general diagonal factorized scattering with bound states and a nontrivial bootstrap structure. The conjectured expression is a spectral expansion which uses the exact form factors and the excited state thermodynamic Bethe Ansatz as building blocks. The conjecture is proven for the case of the trace of the energy-moment tensor. Concerning its validity for more general operators, we provide numerical evidence using the truncated conformal space approach. It is found that the expansion fails to be well-defined for small values of the volume in cases when the singularity structure of the TBA equations undergoes a non-trivial rearrangement under some critical value of the volume. Despite these shortcomings, the conjectured expression is expected to be valid for all volumes for most of the excited states, and as an expansion above the critical volume for the rest.

  18. Aortic root reimplantation procedure: a new milestone in aortic valve-sparing operations

    Directory of Open Access Journals (Sweden)

    А. М. Чернявский

    2016-08-01

    Full Text Available Aim: Emphasis in this study was placed on clinical and functional assessment of a modified "Florida Sleeve" procedure during surgical correction of ascending aorta aneurysms with concomitant aortic insufficiency.Methods: 32 patients with an aneurysm of the ascending aorta and aortic insufficiency underwent a modified "Florida Sleeve" procedure. The average follow-up was 17 (0-60 months. The average age of patients was 57±13 (23-73 years 56±13 years.Results: The expected 4-year cumulative survival rate was 84.3%. Overall freedom from aortic insufficiency in the late period was 88.9%. Median aortic regurgitation was 1+ (1; 2. Long-term follow-up revealed no valve-associated complications.Conclusion: The aortic root reimplantation procedure enables optimal correction of the existing lesions of the aortic root without performing aortic valve replacement and demonstrates stable clinical and functional outcomes in the long-term period.Key words: aortic aneurysm; aortic valve; valve-sparing operations.FundingThe study had no sponsorship.Conflict of interestThe authors declare no conflict of interest.

  19. Solid Waste Operations Complex W-113: Project cost estimate. Preliminary design report. Volume IV

    International Nuclear Information System (INIS)

    1995-01-01

    This document contains Volume IV of the Preliminary Design Report for the Solid Waste Operations Complex W-113 which is the Project Cost Estimate and construction schedule. The estimate was developed based upon Title 1 material take-offs, budgetary equipment quotes and Raytheon historical in-house data. The W-113 project cost estimate and project construction schedule were integrated together to provide a resource loaded project network

  20. Development of the step complexity measure for emergency operating procedures using entropy concepts

    International Nuclear Information System (INIS)

    Park, Jinkyun; Jung, Wondea; Ha, Jaejoo

    2001-01-01

    For a nuclear power plant (NPP), symptom-based emergency operating procedures (EOPs) have been adopted to enhance the safety of NPPs through reduction of operators' workload under emergency conditions. Symptom-based EOPs, however, could place a workload on operators because they have to not only identify related symptoms, but also understand the context of steps that should be carried out. Therefore, many qualitative checklists are suggested to ensure the appropriateness of steps included in EOPs. However, since these qualitative evaluations have some drawbacks, a quantitative measure that can roughly estimate the complexity of EOP steps is imperative to compensate for them. In this paper, a method to evaluate the complexity of an EOP step is developed based on entropy measures that have been used in software engineering. Based on these, step complexity (SC) measure that can evaluate SC from various viewpoints (such as the amount of information/operators' actions included in each EOP step, and the logic structure of each EOP step) was developed. To verify the suitableness of the SC measure, estimated SC values are compared with subjective task load scores obtained from the NASA-TLX (task load index) method and step performance time obtained from a full scope simulator. From these comparisons, it was observed that estimated SC values generally agree with the NASA-TLX scores and step performance time data. Thus, it could be concluded that the developed SC measure would be considered for evaluating SC of an EOP step

  1. Influence of step complexity and presentation style on step performance of computerized emergency operating procedures

    Energy Technology Data Exchange (ETDEWEB)

    Xu Song [Department of Industrial Engineering, Tsinghua University, Beijing 100084 (China); Li Zhizhong [Department of Industrial Engineering, Tsinghua University, Beijing 100084 (China)], E-mail: zzli@tsinghua.edu.cn; Song Fei; Luo Wei; Zhao Qianyi; Salvendy, Gavriel [Department of Industrial Engineering, Tsinghua University, Beijing 100084 (China)

    2009-02-15

    With the development of information technology, computerized emergency operating procedures (EOPs) are taking the place of paper-based ones. However, ergonomics issues of computerized EOPs have not been studied adequately since the industrial practice is quite limited yet. This study examined the influence of step complexity and presentation style of EOPs on step performance. A simulated computerized EOP system was developed in two presentation styles: Style A: one- and two-dimensional flowcharts combination; Style B: two-dimensional flowchart and success logic tree combination. Step complexity was quantified by a complexity measure model based on an entropy concept. Forty subjects participated in the experiment of EOP execution using the simulated system. The results of data analysis on the experiment data indicate that step complexity and presentation style could significantly influence step performance (both step error rate and operation time). Regression models were also developed. The regression analysis results imply that operation time of a step could be well predicted by step complexity while step error rate could only partly predicted by it. The result of a questionnaire investigation implies that step error rate was influenced not only by the operation task itself but also by other human factors. These findings may be useful for the design and assessment of computerized EOPs.

  2. SWIFT BAT Loop Heat Pipe Thermal System Characteristics and Ground/Flight Operation Procedure

    Science.gov (United States)

    Choi, Michael K.

    2003-01-01

    The SWIFT Burst Alert Telescope (BAT) Detector Array has a total power dissipation of 208 W. To meet the stringent temperature gradient and thermal stability requirements in the normal operational mode, and heater power budget in both the normal operational and safehold modes, the Detector Array is thermally well coupled to eight constant conductance heat pipes (CCHPs) embedded in the Detector Array Plate (DAP), and two loop heat pipes (LHPs) transport heat fiom the CCHPs to a radiator. The CCHPs have ammonia as the working fluid and the LHPs have propylene as the working fluid. Precision heater controllers, which have adjustable set points in flight, are used to control the LHP compensation chamber and Detector Array XA1 ASIC temperatures. The radiator has the AZ-Tek AZW-LA-II low-alpha white paint as the thermal coating and is located on the anti-sun side of the spacecraft. This paper presents the characteristics, ground operation and flight operation procedures of the LHP thermal system.

  3. 40 CFR Appendix K to Part 75 - Quality Assurance and Operating Procedures for Sorbent Trap Monitoring Systems

    Science.gov (United States)

    2010-07-01

    ... Pump. Use a leak-tight, vacuum pump capable of operating within the candidate system's flow range. 5.1... sorbent trap monitoring system typically operates. The gas flow meter shall be equipped with any necessary... system typically operates. You may either follow the procedures in section 10.3.1 of Method 5 in appendix...

  4. Stimulus- and response-reinforcer contingencies in autoshaping, operant, classical, and omission training procedures in rats.

    Science.gov (United States)

    Atnip, G W

    1977-07-01

    Separate groups of rats received 500 trials of lever-press training under autoshaping (food delivery followed 10-second lever presentations, or occurred immediately following a response); operant conditioning (responding was necessary for food delivery); and classical conditioning (food followed lever presentations regardless of responding). Each group then received 500 trials on an omission procedure in which food was omitted on trials with a response. Another group received 1000 trials on the omission procedure, and a fifth group, random control, received 1000 uncorrelated presentations of lever and food. The autoshaping, operant, and classical groups reached high response levels by the end of initial training. Acquisition was fastest in the autoshaping group. Responding remained consistently low in the control group. The omission group responded at a level between the control group and the other three groups. During omission training, responding in these three groups declined to the omission-group level. During omission training, the rats continued contacting the lever frequently after lever pressing had declined. Response maintenance under omission training seems not to require topographic similarity between the response and reinforcer-elicited consummatory behaviors.

  5. 40 CFR 86.1838-01 - Small volume manufacturer certification procedures.

    Science.gov (United States)

    2010-07-01

    ...-Duty Vehicles, Light-Duty Trucks, and Complete Otto-Cycle Heavy-Duty Vehicles § 86.1838-01 Small volume... companies; (iv) Vehicles and/or engines imported or distributed by all firms where the vehicles and/or...-use verification testing to have a minimum odometer mileage of 75 percent of the full useful life...

  6. General decoupling procedure for expectation values of four-operator products in electron–phonon quantum kinetics

    International Nuclear Information System (INIS)

    Teeny, Nicolas; Fähnle, Manfred

    2013-01-01

    In the density-matrix formalism of electron–phonon quantum kinetics, the hierarchy of infinitely many coupled equations of motion for the expectation values of products of electron and phonon creation and annihilation operators of arbitrary order is usually terminated on the level of the equations of motion for the expectation values of three-operator products by using decoupling procedures for the four-operator products occurring in these equations. In the literature, decoupling procedures are discussed for special types of electron and phonon states. In the present paper, generalized decoupling procedures are derived for arbitrary electron and phonon states. (paper)

  7. Mandibular marginal contouring in oriental aesthetic surgery: refined surgical concept and operative procedure.

    Science.gov (United States)

    Satoh, Kaneshige; Mitsukawa, Nobuyuki

    2014-05-01

    In aesthetic mandibular contouring surgery, which is often conducted in Asians, the operative procedure is thought to deliver a more aesthetic mandibular shape by means of contouring conducted as a whole from the ramus to the symphysis. The authors describe the refined concept and operative procedures of mandibular marginal contouring. For the 7-year period from 2004 to 2011, mandibular marginal contouring has been used in 57 consecutive series of Japanese subjects. Patient ages ranged from 18 to 33 years, and the subjects included 15 men and 42 women. The surgery was carried out by cutting off the protruding deformed mandibular margin from the ramus to the symphysis. In 53 of 57 cases, the focus was on angle contouring. Concomitant genioplasty by horizontal osteotomy of the chin was conducted in 42 of 57 cases (recession, advancement, shortening, elongation, and correction of the shift variously). In 22 materials exhibiting bulk around the mandibular, the ramus to the body was excised sagittally and thinned. In all the patients, mandibular marginal contouring from the ramus to the symphysis was completed. Partial masseter muscle resection was conducted in 11 of 57 cases. Mandibular contouring effectively achieved a highly satisfactory result in all cases. The upper portion of the peripheral branch of the trunk of the mental nerve was dissected by an electric scalpel in 1 case but sutured immediately using an 8-0 nylon stitch. Transient palsy of the mental nerve was noticed in a few cases but subsided in 1 to 2 months. No particular complications were encountered. No secondary revision was required in this series. In mandibular angle plasty, mandibular marginal contouring from the ramus to the symphysis should be carried out by cutting off the angle keeping in mind the entire mandibular shape. This concept and the procedure can deliver greater patient satisfaction.

  8. Task Analysis of Emergency Operating Procedures for Generating Quantitative HRA Data

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Yochan; Park, Jinkyun; Kim, Seunghwan; Choi, Sun Yeong; Jung, Wondea; Jang, Inseok [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2015-10-15

    In this paper, the analysis results of the emergency task in the procedures (EOPs; emergency operating procedures) that can be observed from the simulator data are introduced. The task type, component type, system type, and additional information related with the performance of the operators were described. In addition, a prospective application of the analyzed information to HEP quantification process was discussed. In the probabilistic safety analysis (PSA) field, various human reliability analyses (HRAs) have been performed to produce estimates of human error probabilities (HEPs) for significant tasks in complex socio-technical systems. To this end, Many HRA methods have provided basic or nominal HEPs for typical tasks and the quantitative relations describing how a certain performance context or performance shaping factors (PSFs) affects the HEPs. In the HRA community, however, the necessity of appropriate and sufficient human performance data has been recently indicated. This is because a wide range of quantitative estimates in the previous HRA methods are not supported by solid empirical bases. Hence, there have been attempts to collect HRA supporting data. For example, KAERI has started to collect information on both unsafe acts of operators and the relevant PSFs. A characteristic of the database that is being developed at KAERI is that human errors and related PSF surrogates that can be objectively observable are collected from full-scope simulator experiences. In this environment, to produce concretely grounded bases of the HEPs, the traits or attributes of tasks where significant human errors can be observed should be definitely determined. The determined traits should be applicable to compare the HEPs on the traits with the data in previous HRA methods or databases. In this study, task characteristics in a Westinghouse type of EOPs were analyzed with the defining task, component, and system taxonomies.

  9. Procedures for treating common cause failures in safety and reliability studies: Volume 2, Analytic background and techniques: Final report

    International Nuclear Information System (INIS)

    Mosleh, A.; Fleming, K.N.; Parry, G.W.; Paula, H.M.; Worledge, D.H.; Rasmuson, D.M.

    1988-12-01

    This report presents a framework for the inclusion of the impact of common cause failures in risk and reliability evaluations. Common cause failures are defined as that subset of dependent failures for which causes are not explicitly included in the logic model as basic events. The emphasis here is on providing procedures for a practical, systematic approach that can be used to perform and clearly document the analysis. The framework and the methods discussed for performing the different stages of the analysis integrate insights obtained from engineering assessments of the system and the historical evidence from multiple failure events into a systematic, reproducible, and defensible analysis. This document, Volume 2, contains a series of appendices that provide additional background and methodological detail on several important topics discussed in Volume 1

  10. The procedures manual of the Environmental Measurements Laboratory. Volume 1, 28. edition

    Energy Technology Data Exchange (ETDEWEB)

    Chieco, N.A. [ed.

    1997-02-01

    This manual covers procedures and technology currently in use at the Environmental Measurements Laboratory. An attempt is made to be sure that all work carried out will be of the highest quality. Attention is focused on the following areas: quality assurance; sampling; radiation measurements; analytical chemistry; radionuclide data; special facilities; and specifications.

  11. The procedures manual of the Environmental Measurements Laboratory. Volume 1, 28. edition

    International Nuclear Information System (INIS)

    Chieco, N.A.

    1997-02-01

    This manual covers procedures and technology currently in use at the Environmental Measurements Laboratory. An attempt is made to be sure that all work carried out will be of the highest quality. Attention is focused on the following areas: quality assurance; sampling; radiation measurements; analytical chemistry; radionuclide data; special facilities; and specifications

  12. The procedures manual of the Environmental Measurements Laboratory. Volume 2, 28. edition

    Energy Technology Data Exchange (ETDEWEB)

    Chieco, N.A. [ed.

    1997-02-01

    This report contains environmental sampling and analytical chemistry procedures that are performed by the Environmental Measurements Laboratory. The purpose of environmental sampling and analysis is to obtain data that describe a particular site at a specific point in time from which an evaluation can be made as a basis for possible action.

  13. Solid Waste Operations Complex W-113, Detail Design Report (Title II). Volume 3: Specifications

    International Nuclear Information System (INIS)

    1995-09-01

    The Solid Waste Retrieval Facility--Phase 1 (Project W113) will provide the infrastructure and the facility required to retrieve from Trench 04, Burial ground 4C, contact handled (CH) drums and boxes at a rate that supports all retrieved TRU waste batching, treatment, storage, and disposal plans. This includes (1) operations related equipment and facilities, viz., a weather enclosure for the trench, retrieval equipment, weighing, venting, obtaining gas samples, overpacking, NDE, NDA, shipment of waste and (2) operations support related facilities, viz., a general office building, a retrieval staff change facility, and infrastructure upgrades such as supply and routing of water, sewer, electrical power, fire protection, roads, and telecommunication. Title I design for the operations related equipment and facilities was performed by Raytheon/BNFL, and that for the operations support related facilities including infrastructure upgrade was performed by KEH. These two scopes were combined into an integrated W113 Title II scope that was performed by Raytheon/BNFL. Volume 3 is a compilation of the construction specifications that will constitute the Title II materials and performance specifications. This volume contains CSI specifications for non-equipment related construction material type items, performance type items, and facility mechanical equipment items. Data sheets are provided, as necessary, which specify the equipment overall design parameters

  14. Construction and operation of the Spallation Neutron Source: Draft environmental impact statement. Volume 2

    International Nuclear Information System (INIS)

    1998-12-01

    DOE proposes to construct and operate a state-of-the-art, short-pulsed spallation neutron source comprised of an ion source, a linear accelerator, a proton accumulator ring, and an experiment building containing a liquid mercury target and a suite of neutron scattering instrumentation. The proposed Spallation Neutron Source would be designed to operate at a proton beam power of 1 megawatt. The design would accommodate future upgrades to a peak operating power of 4 megawatts. These upgrades may include construction of a second proton accumulation ring and a second target. Volume 1 of this document analyzes the potential environmental impacts from the proposed action and the alternatives. The analysis assumes a facility operating at a power of 1 MW and 4 MW over the life of the facility. The two primary alternatives analyzed in this EIS are: the proposed action (to proceed with building the Spallation Neutron Source) and the No-Action Alternative. This volume contains the following appendices: (A) SNS accident source terms for EIS input; (B) Reports on the selection of alternative sites for the SNS; (C) Letters of consultation on protected species and cultural resources; (D) Ecological resource survey reports and summaries; (E) Descriptions of ORNL research projects in the Walker Branch Watershed; (F) Atmospheric dispersion and dose calculations for normal and accident conditions; (G) Projected air quality modeling effects at NOAA's Walker Branch Monitoring Tower

  15. Solid Waste Operations Complex W-113, Detail Design Report (Title II). Volume 3: Specifications

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    The Solid Waste Retrieval Facility--Phase 1 (Project W113) will provide the infrastructure and the facility required to retrieve from Trench 04, Burial ground 4C, contact handled (CH) drums and boxes at a rate that supports all retrieved TRU waste batching, treatment, storage, and disposal plans. This includes (1) operations related equipment and facilities, viz., a weather enclosure for the trench, retrieval equipment, weighing, venting, obtaining gas samples, overpacking, NDE, NDA, shipment of waste and (2) operations support related facilities, viz., a general office building, a retrieval staff change facility, and infrastructure upgrades such as supply and routing of water, sewer, electrical power, fire protection, roads, and telecommunication. Title I design for the operations related equipment and facilities was performed by Raytheon/BNFL, and that for the operations support related facilities including infrastructure upgrade was performed by KEH. These two scopes were combined into an integrated W113 Title II scope that was performed by Raytheon/BNFL. Volume 3 is a compilation of the construction specifications that will constitute the Title II materials and performance specifications. This volume contains CSI specifications for non-equipment related construction material type items, performance type items, and facility mechanical equipment items. Data sheets are provided, as necessary, which specify the equipment overall design parameters.

  16. Operation Procedure of Inspection Equipment for TRISO-coated Fuel Particle

    International Nuclear Information System (INIS)

    Kim, S. H.; Kim, Y. K.; Cho, M. S.; Kim, Y. M.; Park, J. Y.; Kim, W. J.; Jeong, K. C.; Oh, S. C.; Lee, Y. W.

    2007-03-01

    TRISO-coated fuel particle for HTGR(high temperature gas cooled reactor) is composed of fuel kernel and coating layers. The kernel and coated particle are characterized by inspection processes for inspection items such as diameter of kernel, thickness, density and an-isotropy of coating layer. The coating thickness can be nondestructively measured by X-ray inspection equipment. The coating thickness as well as the sphericity can be also measured by optical inspection system as a ceramography method. The an-isotropy can be characterized by photometer. The density of coating layer can be measured by density column. The size and sphericity of particles can be measured by PSA(particle size analyzer). The thermo-chemical characteristics of kernel can be analyzed by TG/DTA(Thermogravimetric/Differential Thermal Analyzer). The inspection objective, equipment composition, operation principle, operation manual for each equipment was described in this operation procedure, which will be used for the characterization of inspection items described above

  17. Process improvement of the emergency operating procedures for Embalse Nuclear Power Plant

    Energy Technology Data Exchange (ETDEWEB)

    Mariotti, A.D.; Pomerantz, M.; Moreno, C., E-mail: dmariotti@na-sa.com.ar, E-mail: mpomerantz@na-sa.com.ar, E-mail: cmoreno@na-sa.com.ar [Embalse Nuclear Power Plant, Nuclear Safety Dept., Embalse (Argentina)

    2014-07-01

    Emergency Operating Procedures (EOP) package of the Embalse Nuclear Power Plant (CNE) were made entirely by the plant staff since the beginning of its operation. With the emergence of Severe Accidents Guidelines (SAMG) and the latest events related to Fukushima, the EOP philosophy should include a new concept. It should consider that the EOP may be unsuccessful and an exit to the SAMG must be necessary. However, due to abnormal event mitigation using EOP is the way to prevent the beginning of a severe accident, EOP always had significant relevance in the plant documentation. For this reason, added to the overall requirement of an exit to the SAMG, it emerges a general review of the use efficiency of the EOP during an abnormal event. For this reason, a comprehensive process improvement has emerged using the operating experience, full-scope simulator training of the control room staff, advances in technology and the arrival of new generations. In this work, fundamental changes, new document format and ergonomic redesign for validation at full-scope simulator and use at main control room of new EOP for CNE are presented. (author)

  18. Modification of Operating Procedure for EZ-Retriever (Trademark) Microwave to Produce Consistent and Reproducible Immunohistochemical Results

    National Research Council Canada - National Science Library

    Tompkins, Christina P; Fath, Denise M; Hamilton, Tracey A; Kan, Robert K

    2006-01-01

    The present study was conducted to optimize the operating procedure for the EZ- Retriever" microwave oven to produce consistent and reproducible staining results with microtubule-associated protein 2 (MAP-2...

  19. Financial Reporting Procedures for Defense Distribution Depots - Defense Logistics Agency Business Area of the Defense Business Operations Fund

    National Research Council Canada - National Science Library

    Young, Shelton

    1994-01-01

    In our audit of the FY 1993 Financial Statements for the Distribution Depots--Defense Logistics Agency Business Mea of the Defense Business Operations Fund, we evaluated procedures and controls used...

  20. Procedures to evaluate the efficiency of protective clothing worn by operators applying pesticide.

    Science.gov (United States)

    Espanhol-Soares, Melina; Nociti, Leticia A S; Machado-Neto, Joaquim Gonçalves

    2013-10-01

    The evaluation of the efficiency of whole-body protective clothing against pesticides has already been carried out through field tests and procedures defined by international standards, but there is a need to determine the useful life of these garments to ensure worker safety. The aim of this article is to compare the procedures for evaluating efficiency of two whole-body protective garments, both new and previously used by applicators of herbicides, using a laboratory test with a mannequin and in the field with the operator. The evaluation of the efficiency of protective clothing used both quantitative and qualitative methodologies, leading to a proposal for classification according to efficiency, and determination of the useful life of protective clothing for use against pesticides, based on a quantitative assessment. The procedures used were in accordance with the standards of the modified American Society for Testing and Materials (ASTM) F 1359:2007 and International Organization for Standardization 17491-4. The protocol used in the field was World Health Organization Vector Biology and Control (VBC)/82.1. Clothing tested was personal water repellent and pesticide protective. Two varieties of fabric were tested: Beige (100% cotton) and Camouflaged (31% polyester and 69% cotton). The efficiency in exposure control of the personal protective clothing was measured before use and after 5, 10, 20, and 30 uses and washes under field conditions. Personal protective clothing was worn by workers in the field during the application of the herbicide glyphosate on weed species in mature sugar cane plantations using a knapsack sprayer. The modified ASTM 1359:2007 procedure was chosen as the most appropriate due to its greater repeatability (lower coefficient of variation). This procedure provides quantitative evaluation needed to determine the efficiency and useful life of individual protective clothing, not just at specific points of failure, but according to dermal

  1. RECOMMENDED OPERATING PROCEDURE NO. 56: COLLECTION OF GASEOUS GRAB SAMPLES FROM COMBUSTION SOURCES FOR NITROUS OXIDE MEASUREMENT

    Science.gov (United States)

    The document is a recommended operating procedure, prepare or use in research activities conducted by EPA's Air and Energy Engineering Research Laboratory (AEERL). The procedure applies to the collection of gaseous grab samples from fossil fuel combustion sources for subsequent a...

  2. Expiratory flow limitation and operating lung volumes during exercise in older and younger adults.

    Science.gov (United States)

    Smith, Joshua R; Kurti, Stephanie P; Meskimen, Kayla; Harms, Craig A

    2017-06-01

    We determined the effect of aging on expiratory flow limitation (EFL) and operating lung volumes when matched for lung size. We hypothesized that older adults will exhibit greater EFL and increases in EELV during exercise compared to younger controls. Ten older (5M/5W; >60years old) and nineteen height-matched young adults (10M/9W) were recruited. Young adults were matched for%predicted forced vital capacity (FVC) (Y-matched%Pred FVC; n=10) and absolute FVC (Y-matched FVC; n=10). Tidal flow-volume loops were recorded during the incremental exercise test with maximal flow-volume loops measured pre- and post-exercise. Compared to younger controls, older adults exhibited more EFL at ventilations of 26, 35, 51, and 80L/min. The older group had higher end-inspiratory lung volume compared to Y-matched%Pred FVC group during submaximal ventilations. The older group increased EELV during exercise, while EELV stayed below resting in the Y-matched%Pred FVC group. These data suggest older adults exhibit more EFL and increase EELV earlier during exercise compared to younger adults. Copyright © 2017 Elsevier B.V. All rights reserved.

  3. Recommended procedures for performance testing of radiobioassay laboratories: Volume 2, In vitro samples

    International Nuclear Information System (INIS)

    Fenrick, H.W.; MacLellan, J.A.

    1988-11-01

    Draft American National Standards Institute (ANSI) Standard N13.30 (Performance Criteria for Radiobioassay) was developed for the US Department of Energy and the US Nuclear Regulatory Commission to help ensure that bioassay laboratories provide accurate and consistent results. The draft standard specifies the criteria for defining the procedures necessary to establish a bioassay performance-testing laboratory and program. The bioassay testing laboratory will conduct tests to evaluate the performance of service laboratories. Pacific Northwest Laboratory helped develop testing procedures as part of an effort to evaluate the performance criteria by testing the existing measurement capabilities of various bioassay laboratories. This report recommends guidelines for the preparation, handling, storage, distribution, shipping, and documentation of in vitro test samples (artificial urine and fecal matter) for indirect bioassay. The data base and recommended records system for documenting radiobioassay performance at the service laboratories are also presented. 8 refs., 3 tabs

  4. Recommended procedures for performance testing of radiobioassay laboratories: Volume 3, In vivo test phantoms

    International Nuclear Information System (INIS)

    MacLellan, J.A.; Traub, R.J.

    1988-11-01

    Draft American National Standards Institute (ANSI) Standard N13.30 (Performance Criteria for Radiobioassay) was developed for the US Department of Energy and the US Nuclear Regulatory Commission to help ensure that bioassay laboratories provide accurate and consistent results. The draft standard describes the procedures necessary to establish a bioassay performance-testing laboratory and program. The bioassay performance-testing laboratory will conduct tests to evaluate the performance of service laboratories. Pacific Northwest Laboratory helped develop testing procedures as part of an effort to evaluate the draft ANSI N13.30 performance criteria by testing the existing measurement capabilities of various bioassay laboratories. This report recommends guidelines for the preparation, handling, storage, distribution, shipping, and documentation of test phantoms used for calibration of measurement systems for direct bioassay. The data base and recommended records system for documenting radiobioassay performance at the service laboratories are also presented

  5. The utility experience of implementing the emergency operating procedure tracking system

    International Nuclear Information System (INIS)

    Chang, W.C.; Cheng, J.F.

    1990-01-01

    This report presents the experience of a project sponsored by the Electric Power Research Institute (EPRI), Taiwan Power Company (TPC) and supported by the Nuclear Software Service (NSS), General Electric Company (GE) and Science Applications International Corporation (SAIC) to implement the Emergency Operating Procedure Tracking System (EOPTS) in Kuosheng Nuclear Power Station Simulator. Before implement the EOPTS in Kuosheng Simulator, the Safety Parameter Display System (SPDS) of the Energency Response Facility Technical Data System (ERFTDS) shall be simulated, the hardware and software linkage between the simulator and ERFTDS shall be established, that include installation of a VAX-8200 computer, Gould - Vax computer hardware linkage, ERFTDS software installation, simulator source variables selection and linkage it to the ERFTDS database

  6. Smart Wireless Power Transfer Operated by Time-Modulated Arrays via a Two-Step Procedure

    Directory of Open Access Journals (Sweden)

    Diego Masotti

    2015-01-01

    Full Text Available The paper introduces a novel method for agile and precise wireless power transmission operated by a time-modulated array. The unique, almost real-time reconfiguration capability of these arrays is fully exploited by a two-step procedure: first, a two-element time-modulated subarray is used for localization of tagged sensors to be energized; the entire 16-element TMA then provides the power to the detected tags, by exploiting the fundamental and first-sideband harmonic radiation. An investigation on the best array architecture is carried out, showing the importance of the adopted nonlinear/full-wave computer-aided-design platform. Very promising simulated energy transfer performance of the entire nonlinear radiating system is demonstrated.

  7. Colovaginal anastomosis: an unusual complication of stapler use in restorative procedure after Hartmann operation

    Directory of Open Access Journals (Sweden)

    Liao Guoqing

    2005-11-01

    Full Text Available Abstract Background Rectovaginal fistula is uncommon after lower anterior resection for rectal cancer. The most leading cause of this complication is involvement of the posterior wall of the vagina into the staple line when firing the circular stapler. Case presentation A 50-year-old women underwent resection for obstructed carcinoma of the sigmoid colon with Hartmann procedure. Four months later she underwent restorative surgery with circular stapler. Following which she developed rectovaginal fistula. A transvaginal repair was performed but stool passing from vagina not per rectum. Laporotomy revealed colovaginal anastomosis, which was corrected accordingly. Patient had an uneventful recovery. Conclusion Inadvertent formation of colovaginal anastomosis associated with a rectovaginal fistula is a rare complication caused by the operator's error. The present case again highlights the importance of ensuring that the posterior wall of vagina is away from the staple line.

  8. Framework and operational procedure for implementing Strategic Environmental Assessment in China

    International Nuclear Information System (INIS)

    Bao Cunkuan; Lu Yongsen; Shang Jincheng

    2004-01-01

    Over the last 20 years, Environmental Impact Assessment (EIA) has been implemented and become an important instrument for decision-making in development projects in China. The Environmental Impact Assessment Law of the P.R. China was promulgated on 28 October 2002 and will be put into effect on 1 September of 2003. The law provides that Strategic Environmental Assessment (SEA) is required in regional and sector plans and programs. This paper introduces the research achievements and practice of SEA in China, discusses the relationship of SEA and 'integrating of environment and development in decision-making (IEDD)', and relevant political and legal basis of SEA. The framework and operational procedures of SEA administration and enforcement are presented. Nine cases are analyzed and some proposals are given

  9. A Heuristic Procedure for the Outbound Container Relocation Problem during Export Loading Operations

    Directory of Open Access Journals (Sweden)

    Roberto Guerra-Olivares

    2015-01-01

    Full Text Available During export ship loading operations, it is often necessary to perform relocation movements with containers that interfere with access to the desired container in the ship loading sequence. This paper presents a real-time heuristic procedure for the container relocation problem employing reachstacker vehicles as container handling equipment. The proposed heuristic searches for good relocation coordinates within a set of nearby bays. The heuristic has a parameter that determines how far from the original bay a container may be relocated. The tradeoff between reducing relocation movements and limiting vehicle travel distances is examined and the performance of the heuristic is compared with a common practice in the smaller container terminals in Chile and Mexico. Finally, a mathematical model for the container relocation problem is presented.

  10. Lessons learned from the special inspection program for emergency operating procedures: Conducted March--October 1988

    International Nuclear Information System (INIS)

    1989-04-01

    The results of the team inspections conducted during 1988 for the Nuclear Regulatory Commission (NRC) Emergency Operating Procedures (EOPs) Inspection Program are summarized in this report. Inspection results are discussed in relation to past staff guidance provided to utilities for upgrade of EOPs. In this report the NRC presents information of particular interest to the nuclear power industry regarding concerns that were identified during the EOP team inspections and restates the staff's previous guidance in a format that more clearly illustrates the consequences of programmatic weaknesses. The information contained in this report is provided so that licensees may take advantage of the lessons learned from the EOP inspection effort. This report does not impose any new requirements related to the upgrading of EOPs. 7 refs

  11. Use of Formal Procedures in Developing Dialogue Between Operator and Regulator on Radioactive Waste Disposal

    International Nuclear Information System (INIS)

    Yearsley, Roger; Duerden, Susan; Bennett, David

    2001-01-01

    The Environment Agency (the Agency) is responsible, in England and Wales, for authorisation of radioactive waste disposal under the Radioactive Substances Act 1993. British Nuclear Fuels plc (BNFL) is currently authorised to dispose of solid low level radioactive waste at its Drigg site near Sellafield in Cumbria. Drigg is the primary site for the disposal of solid low level radioactive waste generated by the UK nuclear industry. A small facility operated by United Kingdom Atomic Energy Authority (UKAEA) at Dounreay on the north coast of Scotland is used solely for wastes arising on the UKAEA site. Drigg also offers a disposal route for smaller users of radioactive substances, such as hospitals and universities. Significant benefits have been derived from implementing a formal Issue Resolution Procedure as part of a soundly based process for dialogue between the Agency and BNFL. Benefits include improved understanding of the Agency's expectations, which has in turn led to improvements in BNFL's documentation and technical approach. The Agency considers the use of a formal Issue Resolution Procedure has placed the dialogue with BNFL on firm foundations for the planned assessment of the PostClosure Safety Case for Drigg when it is submitted in September 2002

  12. Enhanced Oceanic Operations Human-In-The-Loop In-Trail Procedure Validation Simulation Study

    Science.gov (United States)

    Murdoch, Jennifer L.; Bussink, Frank J. L.; Chamberlain, James P.; Chartrand, Ryan C.; Palmer, Michael T.; Palmer, Susan O.

    2008-01-01

    The Enhanced Oceanic Operations Human-In-The-Loop In-Trail Procedure (ITP) Validation Simulation Study investigated the viability of an ITP designed to enable oceanic flight level changes that would not otherwise be possible. Twelve commercial airline pilots with current oceanic experience flew a series of simulated scenarios involving either standard or ITP flight level change maneuvers and provided subjective workload ratings, assessments of ITP validity and acceptability, and objective performance measures associated with the appropriate selection, request, and execution of ITP flight level change maneuvers. In the majority of scenarios, subject pilots correctly assessed the traffic situation, selected an appropriate response (i.e., either a standard flight level change request, an ITP request, or no request), and executed their selected flight level change procedure, if any, without error. Workload ratings for ITP maneuvers were acceptable and not substantially higher than for standard flight level change maneuvers, and, for the majority of scenarios and subject pilots, subjective acceptability ratings and comments for ITP were generally high and positive. Qualitatively, the ITP was found to be valid and acceptable. However, the error rates for ITP maneuvers were higher than for standard flight level changes, and these errors may have design implications for both the ITP and the study's prototype traffic display. These errors and their implications are discussed.

  13. A standard operating procedure for the surgical implantation of transmitters in juvenile salmonids

    Science.gov (United States)

    Liedtke, T.L.; Beeman, J.W.; Gee, L.P.

    2012-01-01

    Biotelemetry is a useful tool to monitor the movements of animals and is widely applied in fisheries research. Radio or acoustic technology can be used, depending on the study design and the environmental conditions in the study area. A broad definition of telemetry also includes the use of Passive Integrated Transponder (PIT) tags, either separately or with a radio or acoustic transmitter. To use telemetry, fish must be equipped with a transmitter. Although there are several attachment procedures available, surgical implantation of transmitters in the abdominal cavity is recognized as the best technique for long-term telemetry studies in general (Stasko and Pincock, 1977; Winter, 1996; Jepsen, 2003), and specifically for juvenile salmonids, Oncorhynchus spp. (Adams and others, 1998a, 1998b; Martinelli and others, 1998; Hall and others, 2009). Studies that use telemetry assume that the processes by which the animals are captured, handled, and tagged, as well as the act of carrying the transmitter, will have minimal effect on their behavior and performance. This assumption, commonly stated as a lack of transmitter effects, must be valid if telemetry studies are to describe accurately the movements and behavior of an entire population of interest, rather than the subset of that population that carries transmitters. This document describes a standard operating procedure (SOP) for surgical implantation of radio or acoustic transmitters in juvenile salmonids. The procedures were developed from a broad base of published information, laboratory experiments, and practical experience in tagging thousands of fish for numerous studies of juvenile salmon movements near Columbia River and Snake River hydroelectric dams. Staff from the Western Fisheries Research Center's Columbia River Research Laboratory (CRRL) frequently have used telemetry studies to evaluate new structures or operations at hydroelectric dams in the Columbia River Basin, and these evaluations typically

  14. Development and operation of a quality assurance system for deviations from standard operating procedures in a clinical cell therapy laboratory.

    Science.gov (United States)

    McKenna, D; Kadidlo, D; Sumstad, D; McCullough, J

    2003-01-01

    Errors and accidents, or deviations from standard operating procedures, other policy, or regulations must be documented and reviewed, with corrective actions taken to assure quality performance in a cellular therapy laboratory. Though expectations and guidance for deviation management exist, a description of the framework for the development of such a program is lacking in the literature. Here we describe our deviation management program, which uses a Microsoft Access database and Microsoft Excel to analyze deviations and notable events, facilitating quality assurance (QA) functions and ongoing process improvement. Data is stored in a Microsoft Access database with an assignment to one of six deviation type categories. Deviation events are evaluated for potential impact on patient and product, and impact scores for each are determined using a 0- 4 grading scale. An immediate investigation occurs, and corrective actions are taken to prevent future similar events from taking place. Additionally, deviation data is collectively analyzed on a quarterly basis using Microsoft Excel, to identify recurring events or developing trends. Between January 1, 2001 and December 31, 2001 over 2500 products were processed at our laboratory. During this time period, 335 deviations and notable events occurred, affecting 385 products and/or patients. Deviations within the 'technical error' category were most common (37%). Thirteen percent of deviations had a patient and/or a product impact score > or = 2, a score indicating, at a minimum, potentially affected patient outcome or moderate effect upon product quality. Real-time analysis and quarterly review of deviations using our deviation management program allows for identification and correction of deviations. Monitoring of deviation trends allows for process improvement and overall successful functioning of the QA program in the cell therapy laboratory. Our deviation management program could serve as a model for other laboratories in

  15. Development of SRC-I product analysis. Volume 3. Documentation of procedures

    Energy Technology Data Exchange (ETDEWEB)

    Schweighardt, F.K.; Kingsley, I.S.; Cooper, F.E.; Kamzelski, A.Z.; Parees, D.M.

    1983-09-01

    This section documents the BASIC computer program written to simulate Wilsonville's GC-simulated distillation (GCSD) results at APCI-CRSD Trexlertown. The GC conditions used at APCI for the Wilsonville GCSD analysis of coal-derived liquid samples were described in the SRC-I Quarterly Technical Report, April-June 1981. The approach used to simulate the Wilsonville GCSD results is also from an SRC-I Quarterly Technical Report and is reproduced in Appendix VII-A. The BASIC computer program is described in the attached Appendix VII-B. Analysis of gases produced during coal liquefaction generates key information needed to determine product yields for material balance and process control. Gas samples from the coal process development unit (CPDU) and tubing bombs are the primary samples analyzed. A Carle gas chromatographic system was used to analyze coal liquefaction gas samples. A BASIC computer program was written to calculate the gas chromatographic peak area results into mole percent results. ICRC has employed several analytical workup procedures to determine the amount of distillate, oils, asphaltenes, preasphaltenes, and residue in SRC-I process streams. The ASE procedure was developed using Conoco's liquid column fractionation (LC/F) method as a model. In developing the ASE procedure, ICRC was able to eliminate distillation, and therefore quantify the oils fraction in one extraction step. ASE results were shown to be reproducible within +- 2 wt %, and to yield acceptable material balances. Finally, the ASE method proved to be the least affected by sample composition.

  16. An operative gamma camera for sentinel lymph node procedure in case of breast cancer

    CERN Document Server

    Salvador, S; Mathelin, C; Guyonne, J; Huss, D

    2007-01-01

    Large field of view gamma cameras are widely used to perform lymphoscintigraphy in the sentinel lymph nodes (SLN) procedure in case of breast cancer. However, they are not specified for this application and their sizes do not enable their use in the operative room to control the excision of the all SLN. We present the results obtained with a prototype of a new mini gamma camera developed especially for the operative lymphoscintigraphy of the axillary area in case of breast cancer. This prototype is composed of 10 mm thick parallel lead collimator, a 2 mm thick GSO:Ce inorganic scintillating crystal from Hitachi and a Hamamatsu H8500 flat panel multianode (64 channels) photomultiplier tube (MAPMT) equipped with a dedicated electronics. Its actual field of view is 50 × 50mm2. The gamma interaction position in the GSO scintillating plate is obtained by calculating the center of gravity of the fired MAPMT channels. The measurements performed with this prototype demonstrate the usefulness of this mini gamma camer...

  17. HEMP emergency planning and operating procedures for electric power systems. Power Systems Technology Program

    Energy Technology Data Exchange (ETDEWEB)

    Reddoch, T.W.; Markel, L.C. [Electrotek Concepts, Inc., Knoxville, TN (United States)

    1991-12-31

    Investigations of the impact of high-altitude electromagnetic pulse (HEMP) on electric power systems and electrical equipment have revealed that HEMP creates both misoperation and failures. These events result from both the early time E{sub 1} (steep-front pulse) component and the late time E{sub 3} (geomagnetic perturbations) component of HEMP. In this report a HEMP event is viewed in terms of its marginal impact over classical power system disturbances by considering the unique properties and consequences of HEMP. This report focuses on system-wide electrical component failures and their potential consequences from HEMP. In particular, the effectiveness of planning and operating procedures for electric systems is evaluated while under the influence of HEMP. This assessment relies on published data and characterizes utilities using the North American Electric Reliability Council`s regions and guidelines to model electric power system planning and operations. Key issues addressed by the report include how electric power systems are affected by HEMP and what actions electric utilities can initiate to reduce the consequences of HEMP. The report also reviews the salient features of earlier HEMP studies and projects, examines technology trends in the electric power industry which are affected by HEMP, characterizes the vulnerability of power systems to HEMP, and explores the capability of electric systems to recover from a HEMP event.

  18. 40 CFR 86.095-14 - Small-volume manufacturers certification procedures.

    Science.gov (United States)

    2010-07-01

    ... General Provisions for Emission Regulations for 1977 and Later Model Year New Light-Duty Vehicles, Light... light-duty vehicles and light-duty trucks covered by a certificate of conformity conform to the regulations while being operated at any altitude locations, and a statement of the altitude at which the...

  19. Recommended procedures for performance testing of radiobioassay laboratories: Volume 1, Quality assurance

    International Nuclear Information System (INIS)

    Fenrick, H.W.; MacLellan, J.A.

    1988-11-01

    Draft American National Standards Institute (ANSI) Standard N13.30 (Performance Criteria for Radiobioassay) was developed in response to a concern expressed by the US Department of Energy and US Nuclear Regulatory Commission to help ensure that bioassay laboratories provide accurate and consistent results. The draft standard specifies the criteria for defining the procedures necessary to establish a bioassay performance-testing laboratory and program. The testing laboratory will conduct tests to evaluate the performance of service laboratories. Pacific Northwest Laboratory helped define responsibilities and develop procedures as part of an effort to evaluate the draft ANSI N13.30 performance criteria for quality assurance at bioassay laboratories. This report recommends elements of quality assurance and quality control responsibilities for the bioassay performance-testing laboratory program, including the qualification and performance of personnel and the calibration, certification, and performance of equipment. The data base and recommended records system for documenting radiobioassay performance at the service laboratories are also presented. 15 refs

  20. Remedial investigation/feasibility study of the Clinch River/Poplar Creek operable unit. Volume 5

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    This volume is in support of the findings of an investigation into contamination of the Clinch River and Poplar Creek near the Oak Ridge Reservation (for more than 50 years, various hazardous and radioactive substances have been released to the environment as a result of operations and waste management activities there). It addresses the quality assurance objectives for measuring the data, presents selected historical data, contains data from several discrete water characterization studies, provides data supporting the sediment characterization, and contains data related to several biota characterization studies.

  1. Operating experience feedback report -- turbine-generator overspeed protection systems: Commercial power reactors. Volume 11

    International Nuclear Information System (INIS)

    Ornstein, H.L.

    1995-04-01

    This report presents the results of the US Nuclear Regulatory Commission's Office for Analysis and Evaluation of Operational Data (AEOD) review of operating experience of main turbine-generator overspeed and overspeed protection systems. It includes an indepth examination of the turbine overspeed event which occurred on November 9, 1991, at the Salem Unit 2 Nuclear Power Plant. It also provides information concerning actions taken by other utilities and the turbine manufacturers as a result of the Salem overspeed event. AEOD's study reviewed operating procedures and plant practices. It noted differences between turbine manufacturer designs and recommendations for operations, maintenance, and testing, and also identified significant variations in the manner that individual plants maintain and test their turbine overspeed protection systems. AEOD's study provides insight into the shortcomings in the design, operation, maintenance, testing, and human factors associated with turbine overspeed protection systems. Operating experience indicates that the frequency of turbine overspeed events is higher than previously thought and that the bases for demonstrating compliance with NRC's General Design Criterion (GDC) 4, Environmental and dynamic effects design bases, may be nonconservative with respect to the assumed frequency

  2. 30 CFR 761.15 - Procedures for waiving the prohibition on surface coal mining operations within the buffer zone...

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Procedures for waiving the prohibition on surface coal mining operations within the buffer zone of an occupied dwelling. 761.15 Section 761.15... surface coal mining operations within the buffer zone of an occupied dwelling. (a) This section does not...

  3. Conditional Monthly Weather Resampling Procedure for Operational Seasonal Water Resources Forecasting

    Science.gov (United States)

    Beckers, J.; Weerts, A.; Tijdeman, E.; Welles, E.; McManamon, A.

    2013-12-01

    To provide reliable and accurate seasonal streamflow forecasts for water resources management several operational hydrologic agencies and hydropower companies around the world use the Extended Streamflow Prediction (ESP) procedure. The ESP in its original implementation does not accommodate for any additional information that the forecaster may have about expected deviations from climatology in the near future. Several attempts have been conducted to improve the skill of the ESP forecast, especially for areas which are affected by teleconnetions (e,g. ENSO, PDO) via selection (Hamlet and Lettenmaier, 1999) or weighting schemes (Werner et al., 2004; Wood and Lettenmaier, 2006; Najafi et al., 2012). A disadvantage of such schemes is that they lead to a reduction of the signal to noise ratio of the probabilistic forecast. To overcome this, we propose a resampling method conditional on climate indices to generate meteorological time series to be used in the ESP. The method can be used to generate a large number of meteorological ensemble members in order to improve the statistical properties of the ensemble. The effectiveness of the method was demonstrated in a real-time operational hydrologic seasonal forecasts system for the Columbia River basin operated by the Bonneville Power Administration. The forecast skill of the k-nn resampler was tested against the original ESP for three basins at the long-range seasonal time scale. The BSS and CRPSS were used to compare the results to those of the original ESP method. Positive forecast skill scores were found for the resampler method conditioned on different indices for the prediction of spring peak flows in the Dworshak and Hungry Horse basin. For the Libby Dam basin however, no improvement of skill was found. The proposed resampling method is a promising practical approach that can add skill to ESP forecasts at the seasonal time scale. Further improvement is possible by fine tuning the method and selecting the most

  4. Composite Failure Analysis Handbook. Volume 2: Technical Handbook. Part 1 - Procedures and Techniques

    Science.gov (United States)

    1992-02-01

    If abrasive cutting equipment is not available or coolant contamination is a concern, hand operated toothed blades or saws such as hack or coping saws...325 F) CE-345 7781 387 9.0 (15 PSI/250 F) CE-aSS 7781 35.1 8.1 (15 PS1/250 F) CE-339 120 A9.4 19.3 (15 PS4 /250 F) CE-324 7781 37 * 3 10.__5 I10 MIN/15

  5. The use of operator surveys by the CEGB to evaluate nuclear control room design and initiatives in the design of alarm systems and control room operating procedures

    International Nuclear Information System (INIS)

    Jackson, A.R.G.

    1988-01-01

    This paper reports on the use of operator surveys and trip report analysis methods which the Central Electricity Generating Board has developed to assess the extent and adequacy of operator support systems currently installed on its four twin-reactor, first generation Advanced Gas Cooled Reactor nuclear power plants. The survey consisted of a programme of structured interviews with control room engineers. The scope of the questions addressed; working environment, communications, man-machine interface, procedural information, and the diagnostic and predictive support system. The analysis of trip reports was targetted at identifying aspects of the performance of the operator support systems which might have been contributory to the cause of reactor trip. The results of this work are being used to assist in determining guidelines for the development of operator support systems, computerised controls and the structure of station operating procedures

  6. Estimates of emergency operating capacity in US manufacturing and nonmanufacturing industries - Volume 1: Concepts and Methodology

    Energy Technology Data Exchange (ETDEWEB)

    Belzer, D.B. (Pacific Northwest Lab., Richland, WA (USA)); Serot, D.E. (D/E/S Research, Richland, WA (USA)); Kellogg, M.A. (ERCE, Inc., Portland, OR (USA))

    1991-03-01

    Development of integrated mobilization preparedness policies requires planning estimates of available productive capacity during national emergency conditions. Such estimates must be developed in a manner to allow evaluation of current trends in capacity and the consideration of uncertainties in various data inputs and in engineering assumptions. This study developed estimates of emergency operating capacity (EOC) for 446 manufacturing industries at the 4-digit Standard Industrial Classification (SIC) level of aggregation and for 24 key nonmanufacturing sectors. This volume lays out the general concepts and methods used to develop the emergency operating estimates. The historical analysis of capacity extends from 1974 through 1986. Some nonmanufacturing industries are included. In addition to mining and utilities, key industries in transportation, communication, and services were analyzed. Physical capacity and efficiency of production were measured. 3 refs., 2 figs., 12 tabs. (JF)

  7. Standard Operating Procedure (SOP) for Rapid and Efficient Production of Stevia Tissue Culture Seedlings

    International Nuclear Information System (INIS)

    Norazlina Noordin; Peng, C.S.; Rusli Ibrahim

    2015-01-01

    Stevia rebaudiana Bertoni is a non-caloric natural sweetener which is 300 times sweeter than cane sugar. Extracts from stevia leaves has vast application in food and beverages based industries, can be added to tea and coffee, cooked or baked goods, processed foods and confectionary goods. Recently, stevia attained awareness owing to its natural, non-caloric sweetness by diet/ health conscious and diabetic persons (Arpita et al., 2011). This natural sweetener has high commercial value in global market, it was estimated that global market value for stevia is be around USD11 billion by year 2015. Although stevia is being largely popularized in Malaysia and other countries but large-scale propagation procedures for the continuous supply of planting materials in commercial plantation has yet to be established, optimized and standardized. Furthermore, propagation through stevia seeds is often very difficult due to self-incompatibility which results in sterile seeds (Sakaguchi et al., 1982). Tissue culture is the only rapid process for the mass propagation of stevia and there have been few reports of in vitro growth of stevia (Miyagaya et al., 1986) and in vitro micropropagation from shoot tip and leaf (Uddin et al., 2006). Hence, study was carried out to establish a suitable protocol for in vitro propagation of S. rebaudiana Bertoni that can be further up-scaled for mass propagation of stevia seedlings. The established Standard Operating Procedure (SOP) will ensure rapid and efficient production of stevia tissue culture seedlings for continuous supply of planting materials for commercial stevia plantations in Malaysia. Preparation of growth medium, multiplication of shoots, rooting of plant lets and hardening of ex-vitro rooted plant lets is discussed in this paper. (author)

  8. Analytical Chemistry Laboratory (ACL) procedure compendium. Volume 3, Inorganic instrumental methods

    Energy Technology Data Exchange (ETDEWEB)

    1993-08-01

    The methods cover: C in solutions, F (electrode), elements by atomic emission spectrometry, inorganic anions by ion chromatography, Hg in water/solids/sludges, As, Se, Bi, Pb, data calculations for SST (single shell tank?) samples, Sb, Tl, Ag, Pu, O/M ratio, ignition weight loss, pH value, ammonia (N), Cr(VI), alkalinity, U, C sepn. from soil/sediment/sludge, Pu purif., total N, water, C and S, surface Cl/F, leachable Cl/F, outgassing of Ge detector dewars, gas mixing, gas isotopic analysis, XRF of metals/alloys/compounds, H in Zircaloy, H/O in metals, inpurity extraction, reduced/total Fe in glass, free acid in U/Pu solns, density of solns, Kr/Xe isotopes in FFTF cover gas, H by combustion, MS of Li and Cs isotopes, MS of lanthanide isotopes, GC operation, total Na on filters, XRF spectroscopy QC, multichannel analyzer operation, total cyanide in water/solid/sludge, free cyanide in water/leachate, hydrazine conc., ICP-MS, {sup 99}Tc, U conc./isotopes, microprobe analysis of solids, gas analysis, total cyanide, H/N{sub 2}O in air, and pH in soil.

  9. Operating procedures for nuclear power plants and their presentation. Working material. Proceedings of a specialists meeting held in Vienna, 31 March - 2 April 1992

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-31

    With a view to exchanging information on most recent development of technology in the field the IAEA International Working Group on Nuclear Power Plant control and Instrumentation suggested to organize a Specialists` Meeting on ``Operating Procedures for Nuclear Power Plants and their Presentation``. The meeting was held in Vienna, at IAEA Headquarters from March 31 to April 2, 1992 and provided an opportunity to: share operators experience; discuss the different techniques of presenting the information; identify further trends of technology and needs of the industry. The meeting was attended by 46 participants representing 12 Member States and 3 international organizations. The present volume contains summary of the meeting, session summaries and papers of the national participants. Refs, figs and tabs.

  10. Operating procedures for nuclear power plants and their presentation. Working material. Proceedings of a specialists meeting held in Vienna, 31 March - 2 April 1992

    International Nuclear Information System (INIS)

    1993-01-01

    With a view to exchanging information on most recent development of technology in the field the IAEA International Working Group on Nuclear Power Plant control and Instrumentation suggested to organize a Specialists' Meeting on ''Operating Procedures for Nuclear Power Plants and their Presentation''. The meeting was held in Vienna, at IAEA Headquarters from March 31 to April 2, 1992 and provided an opportunity to: share operators experience; discuss the different techniques of presenting the information; identify further trends of technology and needs of the industry. The meeting was attended by 46 participants representing 12 Member States and 3 international organizations. The present volume contains summary of the meeting, session summaries and papers of the national participants. Refs, figs and tabs

  11. Process automation system for integration and operation of Large Volume Plasma Device

    International Nuclear Information System (INIS)

    Sugandhi, R.; Srivastava, P.K.; Sanyasi, A.K.; Srivastav, Prabhakar; Awasthi, L.M.; Mattoo, S.K.

    2016-01-01

    Highlights: • Analysis and design of process automation system for Large Volume Plasma Device (LVPD). • Data flow modeling for process model development. • Modbus based data communication and interfacing. • Interface software development for subsystem control in LabVIEW. - Abstract: Large Volume Plasma Device (LVPD) has been successfully contributing towards understanding of the plasma turbulence driven by Electron Temperature Gradient (ETG), considered as a major contributor for the plasma loss in the fusion devices. Large size of the device imposes certain difficulties in the operation, such as access of the diagnostics, manual control of subsystems and large number of signals monitoring etc. To achieve integrated operation of the machine, automation is essential for the enhanced performance and operational efficiency. Recently, the machine is undergoing major upgradation for the new physics experiments. The new operation and control system consists of following: (1) PXIe based fast data acquisition system for the equipped diagnostics; (2) Modbus based Process Automation System (PAS) for the subsystem controls and (3) Data Utilization System (DUS) for efficient storage, processing and retrieval of the acquired data. In the ongoing development, data flow model of the machine’s operation has been developed. As a proof of concept, following two subsystems have been successfully integrated: (1) Filament Power Supply (FPS) for the heating of W- filaments based plasma source and (2) Probe Positioning System (PPS) for control of 12 number of linear probe drives for a travel length of 100 cm. The process model of the vacuum production system has been prepared and validated against acquired pressure data. In the next upgrade, all the subsystems of the machine will be integrated in a systematic manner. The automation backbone is based on 4-wire multi-drop serial interface (RS485) using Modbus communication protocol. Software is developed on LabVIEW platform using

  12. Process automation system for integration and operation of Large Volume Plasma Device

    Energy Technology Data Exchange (ETDEWEB)

    Sugandhi, R., E-mail: ritesh@ipr.res.in; Srivastava, P.K.; Sanyasi, A.K.; Srivastav, Prabhakar; Awasthi, L.M.; Mattoo, S.K.

    2016-11-15

    Highlights: • Analysis and design of process automation system for Large Volume Plasma Device (LVPD). • Data flow modeling for process model development. • Modbus based data communication and interfacing. • Interface software development for subsystem control in LabVIEW. - Abstract: Large Volume Plasma Device (LVPD) has been successfully contributing towards understanding of the plasma turbulence driven by Electron Temperature Gradient (ETG), considered as a major contributor for the plasma loss in the fusion devices. Large size of the device imposes certain difficulties in the operation, such as access of the diagnostics, manual control of subsystems and large number of signals monitoring etc. To achieve integrated operation of the machine, automation is essential for the enhanced performance and operational efficiency. Recently, the machine is undergoing major upgradation for the new physics experiments. The new operation and control system consists of following: (1) PXIe based fast data acquisition system for the equipped diagnostics; (2) Modbus based Process Automation System (PAS) for the subsystem controls and (3) Data Utilization System (DUS) for efficient storage, processing and retrieval of the acquired data. In the ongoing development, data flow model of the machine’s operation has been developed. As a proof of concept, following two subsystems have been successfully integrated: (1) Filament Power Supply (FPS) for the heating of W- filaments based plasma source and (2) Probe Positioning System (PPS) for control of 12 number of linear probe drives for a travel length of 100 cm. The process model of the vacuum production system has been prepared and validated against acquired pressure data. In the next upgrade, all the subsystems of the machine will be integrated in a systematic manner. The automation backbone is based on 4-wire multi-drop serial interface (RS485) using Modbus communication protocol. Software is developed on LabVIEW platform using

  13. Risk and safety of pediatric sedation/anesthesia for procedures outside the operating room.

    Science.gov (United States)

    Cravero, Joseph P

    2009-08-01

    Sedation and anesthesia outside the operating room represents a rapidly growing field of practice that involves a number of different specialty providers including anesthesiology. The literature surrounding this work is found in a variety of journals - many outside anesthesiology. This review is intended to inform readers about the current status of risk and safety involving sedation/anesthesia for tests and minor procedures utilizing a wide range of sources. Two large database studies have helped to define the frequency and nature of adverse events in pediatric sedation/anesthesia practice from a multispecialty perspective. A number of papers describing respiratory and hemodynamic aspects of dexmedetomidine sedation have also been published. Finally, a number of studies relating to training sedation providers, reporting of sedation adverse events, sedation for vulnerable populations, and (in particular) ketamine sedation adverse respiratory events have also come to light. The latest publications continue to document a relatively low risk to pediatric sedation yet also warn us about the potential adverse events in this field. The results help to define competencies required to deliver pediatric sedation and make this practice even safer. Particularly interesting are new jargon and methodologies for defining adverse events and the use of new methods for training sedation providers.

  14. Qualitative research within trials: developing a standard operating procedure for a clinical trials unit

    Science.gov (United States)

    2013-01-01

    Background Qualitative research methods are increasingly used within clinical trials to address broader research questions than can be addressed by quantitative methods alone. These methods enable health professionals, service users, and other stakeholders to contribute their views and experiences to evaluation of healthcare treatments, interventions, or policies, and influence the design of trials. Qualitative data often contribute information that is better able to reform policy or influence design. Methods Health services researchers, including trialists, clinicians, and qualitative researchers, worked collaboratively to develop a comprehensive portfolio of standard operating procedures (SOPs) for the West Wales Organisation for Rigorous Trials in Health (WWORTH), a clinical trials unit (CTU) at Swansea University, which has recently achieved registration with the UK Clinical Research Collaboration (UKCRC). Although the UKCRC requires a total of 25 SOPs from registered CTUs, WWORTH chose to add an additional qualitative-methods SOP (QM-SOP). Results The qualitative methods SOP (QM-SOP) defines good practice in designing and implementing qualitative components of trials, while allowing flexibility of approach and method. Its basic principles are that: qualitative researchers should be contributors from the start of trials with qualitative potential; the qualitative component should have clear aims; and the main study publication should report on the qualitative component. Conclusions We recommend that CTUs consider developing a QM-SOP to enhance the conduct of quantitative trials by adding qualitative data and analysis. We judge that this improves the value of quantitative trials, and contributes to the future development of multi-method trials. PMID:23433341

  15. Manual of Standard Operating Procedures for Veterinary Drug Residue Analysis (Spanish Edition)

    International Nuclear Information System (INIS)

    2017-01-01

    Laboratories are crucial to national veterinary drug residue monitoring programmes. However, one of the main challenges laboratories encounter is obtaining access to relevant methods of analysis. Thus, in addition to training, providing technical advice and transferring technology, the Joint FAO/IAEA Division of Nuclear Techniques in Food and Agriculture has resolved to develop clear and practical manuals to support Member State laboratories. The Coordinated Research Project (CRP) on Development of Radiometric and Allied Analytical Methods to Strengthen Residue Control Programs for Antibiotic and Anthelmintic Veterinary Drug Residues has developed a number of analytical methods as standard operating procedures (SOPs), which are now compiled here. This publication contains SOPs on chromatographic and spectrometric techniques, as well as radioimmunoassay and associated screening techniques, for various anthelmintic and antimicrobial veterinary drug residue analysis. Some analytical method validation protocols are also included. The publication is primarily aimed at food and environmental safety laboratories involved in testing veterinary drug residues, including under organized national residue monitoring programmes. It is expected to enhance laboratory capacity building and competence through the use of radiometric and complementary tools and techniques. The publication is also relevant for applied research on residues of veterinary drugs in food and environmental samples

  16. Development of a standard operating procedure for mammography equipment used in calibration of ionized chambers

    International Nuclear Information System (INIS)

    Rodrigues, Yklys Santos; Potiens, Maria da Penha Albuquerque

    2011-01-01

    Mammography is one widely used technique in the detection of breast cancer. In order to optimize the results achieving better images with lower dose rates, a quality assurance programme must be applied to the equipment. Some control tests use ionization chambers to measure air kerma and other quantities. These tests can only be reliable if the ionization chambers used on them are correctly calibrated. In the present work, it was developed a standard operating procedure (SOP) for quality control tests in a commercial mammography equipment installed in the Calibration Laboratory (LCI) at IPEN - Brazilian Institute for energy and nuclear research). Seven tests were performed in the equipment: Tube voltage and exposition time accuracy and reproducibility, linearity and reproducibility of Air kerma and Half Value Layer (HVL). Then, it was made a measurement of the air kerma in the mammography equipment, using a reference ionization chamber with traceability to a primary laboratory in Germany (Physikalisch-Technische Bundesanstalt - PTB), that was later compared with the air kerma measured in an industrial irradiator. This industrial X-ray generator was recently used in the implementation of X-radiation Standards beams, mammography level, following the Standard IEC 61267. The HVL values varied from 0.36 (25kV) to 0.41 mmA1 (35kV), and the measured air kerma rates were between 9.78 and 17.97 mGy/min. (author)

  17. VAS operational procedures and results at the Kansas City Satellite Field Services Station

    Science.gov (United States)

    Heckman, B.; Carle, W.; Anthony, R.

    1983-01-01

    An operational assessment of VAS data by using a Man-computer Interactive Data Access System (McIDAS) terminal linked by a 9600 band telephone line is discussed. Seven hours of VAS data were processed and edited daily. Data was scheduled 16 hours a day, 7 days a week; however, during this time period there were very few days with 16 hours of data to evalute. The McIDAS terminal, which has 10 display frames and 5 graphics, provide access to the sounding data processed. These data are processed using two procedures. The dwell sounding data are generated by using all 12 spectral channels with a spin budget of 39. To provide coverage for most of the United States, soundings are made starting at 18 minutes after the hour from approximately 49 deg N to 36 deg N and at 48 minutes after the hour from 36 deg N to 26 deg N. The dwell imaging mode uses 11 channels but the spin budge is 17. With the reduced spin budget, retrievals can be made at 18 or 48 minutes after the hour for approximately 44 deg N to 27 deg N. With these constraints a schedule, of data sets was proposed to use the schedule and how the data set could be used are shown.

  18. Acceptance/operational test procedure 241-AN-107 Video Camera System

    International Nuclear Information System (INIS)

    Pedersen, L.T.

    1994-01-01

    This procedure will document the satisfactory operation of the 241-AN-107 Video Camera System. The camera assembly, including camera mast, pan-and-tilt unit, camera, and lights, will be installed in Tank 241-AN-107 to monitor activities during the Caustic Addition Project. The camera focus, zoom, and iris remote controls will be functionally tested. The resolution and color rendition of the camera will be verified using standard reference charts. The pan-and-tilt unit will be tested for required ranges of motion, and the camera lights will be functionally tested. The master control station equipment, including the monitor, VCRs, printer, character generator, and video micrometer will be set up and performance tested in accordance with original equipment manufacturer's specifications. The accuracy of the video micrometer to measure objects in the range of 0.25 inches to 67 inches will be verified. The gas drying distribution system will be tested to ensure that a drying gas can be flowed over the camera and lens in the event that condensation forms on these components. This test will be performed by attaching the gas input connector, located in the upper junction box, to a pressurized gas supply and verifying that the check valve, located in the camera housing, opens to exhaust the compressed gas. The 241-AN-107 camera system will also be tested to assure acceptable resolution of the camera imaging components utilizing the camera system lights

  19. Standard operating procedures for quality audits of 60Co external beam radiotherapy facilities

    International Nuclear Information System (INIS)

    Larrinaga Cortina, E.F.; Dominguez Hung, L.; Campa Menendez, R.

    2001-01-01

    The use of radiotherapy implies the necessity of rigorous quality standards in its different components, aimed to provide the best possible treatment and avoid potential patients' risks, that could even cause him death. Projects of technical cooperation developed in Cuba and supported by the International Atomic Energy Agency address the implementation of Programs of Quality Assurance (PGC) in radiotherapy services. The establishment of the National Quality Audit Program (PNAC) is a superior stage. The National Control Center for Medical Devices, as the national regulator entity for the control and supervision of medical devices in the National Health System, is responsible for the making and execution of the PNAC. The audit modality selected was the inspection visit in situ due to its intrinsic advantages, our geographical extension and the number of radiotherapy services. This paper presents the methodology for the execution of the PNAC, in form of a Normalized Procedure of Operation (PNO) that defines the objectives, scope, terms and definitions, responsibilities, composition and selection of the auditor team, security's conditions, materials and equipment, steps of the audit execution, results calculation and interpretation, records, etc. (author)

  20. Manual of Standard Operating Procedures for Veterinary Drug Residue Analysis (French Edition)

    International Nuclear Information System (INIS)

    2017-01-01

    Laboratories are crucial to national veterinary drug residue monitoring programmes. However, one of the main challenges laboratories encounter is obtaining access to relevant methods of analysis. Thus, in addition to training, providing technical advice and transferring technology, the Joint FAO/IAEA Division of Nuclear Techniques in Food and Agriculture has resolved to develop clear and practical manuals to support Member State laboratories. The Coordinated Research Project (CRP) on Development of Radiometric and Allied Analytical Methods to Strengthen Residue Control Programs for Antibiotic and Anthelmintic Veterinary Drug Residues has developed a number of analytical methods as standard operating procedures (SOPs), which are now compiled here. This publication contains SOPs on chromatographic and spectrometric techniques, as well as radioimmunoassay and associated screening techniques, for various anthelmintic and antimicrobial veterinary drug residue analysis. Some analytical method validation protocols are also included. The publication is primarily aimed at food and environmental safety laboratories involved in testing veterinary drug residues, including under organized national residue monitoring programmes. It is expected to enhance laboratory capacity building and competence through the use of radiometric and complementary tools and techniques. The publication is also relevant for applied research on residues of veterinary drugs in food and environmental samples

  1. Consecutive operative procedures in patients with Marfan syndrome up to 28 years after initial aortic root surgery.

    Science.gov (United States)

    Puluca, Nazan; Burri, Melchior; Cleuziou, Julie; Krane, Markus; Lange, Rüdiger

    2018-02-28

    Most patients (75%) with Marfan syndrome present with aortic root dilatation that may require surgical intervention. However, associated cardiovascular disorders are not limited to the aortic root. These patients frequently require consecutive operations on the remaining thoracic aorta or the heart valves. Our intent was to characterize the spectrum of such procedures. Data from all patients with Marfan syndrome undergoing aortic root surgery at our centre between 1988 and 2016 were analysed retrospectively. Overall, 73 patients (26 women) were selected for the study. The median age at 1st operation was 30 years (3-68 years). Indications for aortic root surgery were aneurysm (78%) and dissection (22%). Initially, 33 Bentall procedures and 40 valve-sparing root replacement procedures were performed, with a 97% rate of follow-up completion. The median follow up was 8 years (0-28 years). Survival at 1, 10 and 15 years was 100%, 85% and 82%, respectively. During follow-up monitoring, 48 subsequent procedures were performed in 33 patients (aorta, 23; aortic valve, 11; mitral valve, 7 and combined procedures, 7). The 30-day mortality rate after subsequent procedures was 4.2%. Freedom from subsequent operation and death (combined end-point) after 5, 10 and 15 years was 70%, 53% and 34%, respectively. After the initial surgery, subsequent procedures required in the setting of Marfan syndrome most often involve the remaining native aorta, followed by the aortic and mitral valves. The continued need for additional operative procedures remains high, even decades after the initial surgeries are undertaken. Therefore, long-term patient monitoring at specialized centres is imperative.

  2. Authorization procedure for the construction and operation of nuclear installations within the EC Member States, including supervision and control

    International Nuclear Information System (INIS)

    Amaducci, Sandro; Didier, J.M.

    1978-01-01

    This report is an updating of the report EUR 5284, Authorization procedure for the construction and operation of nuclear installations within the EEC Member States, prepared in 1974 by J.M. Didier and Associates. Recent developments regarding the authorization procedure for the construction and operation of nuclear installations have taken place in Italy (introduction of a site approval procedure) and in Denmark (adoption of an overall legislation on the subject, however not yet in force). With respect to supervision and control of nuclear installations during construction and operation, competences of, as well as their exercise by, supervisory authorities in all EC Member States, with the exception of Ireland, are also analysed in the current study

  3. Improvement of Safety Features in Standard Operation Procedure of Tc-99m Generator

    International Nuclear Information System (INIS)

    Manisah Saedon; Mohd Khairul Hakimi; Shyen, A.K.S.

    2011-01-01

    This paper describes the improvements proposed to the original production procedures for Tc-99m generators. Improvements are intended to add safety and health features for workers into the existing procedures. The difference between the new safe work procedures from the original work procedures; is the concern about the safety and health of employees other than the product safety. One of the suggested safety characteristics is by using the visual aid so that the workers can easily see and read the procedures when they perform their duties, whereas the previous procedures are kept in the manual and difficult to access. The purpose of this paper is to share information about the importance of safety and health features for the workers in the procedures established in addition to provide awareness to all parties involved. (author)

  4. Evaluation of potential severe accidents during low power and shutdown operations at Surry, Unit 1: Analysis of core damage frequency from internal events during mid-loop operations, Appendices A--D. Volume 2, Part 2

    International Nuclear Information System (INIS)

    Chu, T.L.; Musicki, Z.; Kohut, P.

    1994-06-01

    During 1989, the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the Potential risks during low Power and shutdown operations. The program includes two parallel projects being performed by Brookhaven National Laboratory (BNL) and Sandia National Laboratories (SNL). Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the Plants to be studied. The objectives of the program are to assess the risks of severe accidents initiated during plant operational states other than full power operation and to compare the estimated core damage frequencies, important accident sequences and other qualitative and quantitative results with those accidents initiated during full power operation as assessed in NUREG-1150. The objective of this report is to document the approach utilized in the Surry plant and discuss the results obtained. A parallel report for the Grand Gulf plant is prepared by SNL. This study shows that the core-damage frequency during mid-loop operation at the Surry plant is comparable to that of power operation. We recognize that there is very large uncertainty in the human error probabilities in this study. This study identified that only a few procedures are available for mitigating accidents that may occur during shutdown. Procedures written specifically for shutdown accidents would be useful. This document, Volume 2, Pt. 2 provides appendices A through D of this report

  5. Evaluation of potential severe accidents during low power and shutdown operations at Surry, Unit 1: Analysis of core damage frequency from internal events during mid-loop operations, Appendices A--D. Volume 2, Part 2

    Energy Technology Data Exchange (ETDEWEB)

    Chu, T.L.; Musicki, Z.; Kohut, P. [Brookhaven National Lab., Upton, NY (United States)] [and others

    1994-06-01

    During 1989, the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the Potential risks during low Power and shutdown operations. The program includes two parallel projects being performed by Brookhaven National Laboratory (BNL) and Sandia National Laboratories (SNL). Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the Plants to be studied. The objectives of the program are to assess the risks of severe accidents initiated during plant operational states other than full power operation and to compare the estimated core damage frequencies, important accident sequences and other qualitative and quantitative results with those accidents initiated during full power operation as assessed in NUREG-1150. The objective of this report is to document the approach utilized in the Surry plant and discuss the results obtained. A parallel report for the Grand Gulf plant is prepared by SNL. This study shows that the core-damage frequency during mid-loop operation at the Surry plant is comparable to that of power operation. We recognize that there is very large uncertainty in the human error probabilities in this study. This study identified that only a few procedures are available for mitigating accidents that may occur during shutdown. Procedures written specifically for shutdown accidents would be useful. This document, Volume 2, Pt. 2 provides appendices A through D of this report.

  6. [Falling Short of Minimum Volume Standards, Exemptions and Their Consequences from 2018 Onwards. Complex Procedures on Oesophagus and Pancreas in German Hospitals from 2006 to 2014].

    Science.gov (United States)

    de Cruppé, Werner; Geraedts, Max

    2018-03-16

    The minimum volume standards for hospitals in Germany, in force since 2004, provide four exemptions for non-complying hospitals. This study investigates the extent and importance of these exemptions for complex procedures on the oesophagus and pancreas for all non-complying hospitals and for the revised minimum volume regulations in force since the beginning of 2018. Longitudinal, descriptive analyses of data on minimum volume standards and their exemptions for complex procedures on the oesophagus and pancreas, as presented by the hospital quality report cards of the reporting years from 2006 to 2014. For each year and both procedures, about 120 hospitals with some 500 cases report non-compliance with the minimum volume standards. Of these a third report no exemptions (with 180 procedures), a third state emergencies (110), and another third report exemptions due to internal hospital restructuring (210). Ensuring geographical access to care as an exemption is of no importance. After the three year exemption period for installation of a new service line, 20% of the hospitals with procedures on the oesophagus and 30% on the pancreas complied with the minimum volume standards. After the two-year period for staff realignment, the figures were 40 and 50%, respectively. Exemptions do not entirely explain all procedures performed by hospitals not complying with the minimum volume standards. The revised minimum volume regulations' restructuring of exemptions to "emergencies" and "new or renewed service lines" with a two year exemption period, are concordant with the empirical findings of this study. Georg Thieme Verlag KG Stuttgart · New York.

  7. Emergency operating procedures improvement based on the lesson learned from the Fukushima Daiichi accident

    Energy Technology Data Exchange (ETDEWEB)

    Wu, Wen-Hsiung, E-mail: whwu1127@aec.gov.tw [Atomic Energy Council, 2F., No. 80, Sec.1, Chenggong Rd., Yonghe Dist., New Taipei City 234, Taiwan (China); Institute of Nuclear Engineering and Science, National Tsing Hua University, No. 101, Sec. 2, Guangfu Rd., Hsinchu City 300, Taiwan (China); Liao, Lih-Yih, E-mail: lyliao@iner.gov.tw [Institute of Nuclear Energy Research, Atomic Energy Council, No. 1000, Wenhua Rd., Jiaan Village, Longtan Township, Taoyuan County 325, Taiwan (China)

    2016-12-01

    Highlights: • Discuss the problem of EOPs at the time of Fukushima accident to deal with the prolonged SBO. • Elaborate the potential risk accompanied with the emergency depressurization in the SBO. • Describe a special guideline to cope with Fukushima-like accidents and provide its technical basis. • Point out that Fukushima accident might have been prevented if improved EOPs had been used. • Propose key points and suggestions for improving the EOPs. - Abstract: One of the lessons learned from the Fukushima Daiichi accident is the emergency operating procedures (EOPs) have to be improved. The BWR Owners’ Group revised the emergency procedure guidelines and addressed the lesson learned from the Fukushima Daiichi accident in revision 3 in order to avoid loss of turbine-driven makeup water systems during reactor depressurization. However, the improvement deserves much more attention. The existing EOPs at the time of the accident may not be adequate enough for the prolonged station blackout condition, because resources required for performing the EOPs are vastly unavailable or gradually exhausted. The improved EOPs must not only permit early reactor pressure vessel depressurization, but also address the risk accompanied with the emergency depressurization. For this reason, Taiwan Power Company proposed the Ultimate Response Guideline (URG) to cope with Fukushima-like accidents. The main content of the URG is a two-stage depressurization strategy, namely the controlled depressurization and the emergency depressurization. The technical basis of the two-stage depressurization strategy was discussed in this paper. The effectiveness of the URG was verified by using TRAC/RELAP Advanced Computational Engine (TRACE). Besides, the emergency responses performed by Fukushima Daini nuclear power plant (Fukushima Daini NPP) were found to be very similar to the URG. The consequences of Fukushima Daini NPP somehow demonstrate that the URG is effective for Fukushima

  8. Emergency operating procedures improvement based on the lesson learned from the Fukushima Daiichi accident

    International Nuclear Information System (INIS)

    Wu, Wen-Hsiung; Liao, Lih-Yih

    2016-01-01

    Highlights: • Discuss the problem of EOPs at the time of Fukushima accident to deal with the prolonged SBO. • Elaborate the potential risk accompanied with the emergency depressurization in the SBO. • Describe a special guideline to cope with Fukushima-like accidents and provide its technical basis. • Point out that Fukushima accident might have been prevented if improved EOPs had been used. • Propose key points and suggestions for improving the EOPs. - Abstract: One of the lessons learned from the Fukushima Daiichi accident is the emergency operating procedures (EOPs) have to be improved. The BWR Owners’ Group revised the emergency procedure guidelines and addressed the lesson learned from the Fukushima Daiichi accident in revision 3 in order to avoid loss of turbine-driven makeup water systems during reactor depressurization. However, the improvement deserves much more attention. The existing EOPs at the time of the accident may not be adequate enough for the prolonged station blackout condition, because resources required for performing the EOPs are vastly unavailable or gradually exhausted. The improved EOPs must not only permit early reactor pressure vessel depressurization, but also address the risk accompanied with the emergency depressurization. For this reason, Taiwan Power Company proposed the Ultimate Response Guideline (URG) to cope with Fukushima-like accidents. The main content of the URG is a two-stage depressurization strategy, namely the controlled depressurization and the emergency depressurization. The technical basis of the two-stage depressurization strategy was discussed in this paper. The effectiveness of the URG was verified by using TRAC/RELAP Advanced Computational Engine (TRACE). Besides, the emergency responses performed by Fukushima Daini nuclear power plant (Fukushima Daini NPP) were found to be very similar to the URG. The consequences of Fukushima Daini NPP somehow demonstrate that the URG is effective for Fukushima

  9. Hazard and operability study (Haz Op) of the 2 MW IEA-R1 reactor startup procedures

    International Nuclear Information System (INIS)

    Sauer, Maria E.L.J.; Correa, Francisco; Sara Neto, Antonio J.; Costa, Carlos A.R. da; Santos, Cilas C. dos; Cardenas, Jose P.N.; Berretta, Jose R.; Neves Conti, Thadeu das

    1997-01-01

    This work presents the Hazard and Operability Study (Haz Op) applied to startup procedures of the 2 MW IEA-R1 research reactor, at IPEN/CNEN-S P. The Haz Op was developed by reviewing the procedures of the installation startup, in order to identify hazards and/or operational problems caused by deviations in the execution of these routines. This paper summarizes this study. describing some potential problems of relevant importance to safety as well as preventives and/or correctives measures to avoid their occurrence. Besides, an benefits evaluation and the technique limitations is made. (author). 5 refs., 1 tab

  10. Office for Analysis and Evaluation of Operational Data. 1992 annual report: Nonreactors: Volume 7, No. 2

    Energy Technology Data Exchange (ETDEWEB)

    1993-10-01

    The annual report of the US Nuclear Regulatory Commission`s Office for Analysis and Evaluation of Operational Data (AEOD) is devoted to the activities performed during 1992. The report is published in two separate parts. NUREG-1272, Vol. 7, No. 1, covers power reactors and presents an overview of the operating experience of the nuclear power industry from the NRC perspective, including comments about the trends of some key performance measures. The report also includes the principal findings and issues identified in AEOD studies over the past year and summarizes information from such sources as licensee event reports, diagnostic evaluations, and reports to the NRC`s Operations Center. NUREG-1272, Vol. 7, No. 2, covers nonreactors and presents a review of the events and concerns during 1992 associated with the use of licensed material in nonreactor applications, such as personnel overexposures and medical misadministrations. Both reports also contain a discussion of the Incident Investigation Team program and summarize both the Incident Investigation Team and Augmented Inspection Team reports. Each volume contains a list of the AEOD reports issued for 1981--1992.

  11. Office for Analysis and Evaluation of Operational Data 1993 annual report: Volume 8, Number 1

    International Nuclear Information System (INIS)

    1994-11-01

    This annual report of the US Nuclear Regulatory Commission's Office for Analysis and Evaluation of Operational Data (AEOD) describes activities conducted during 1993. The report is published in two parts. NUREG-1272, Vol. 8, No. 1, covers power reactors and presents an overview of the operating experience of the nuclear power industry from the NRC perspective, including comments about the trends of some key performance measures. The report also includes the principal findings and issues identified in AEOD studies over the past year and summarizes information from such sources as licensee event reports, diagnostic evaluations, and reports to the NRC's Operations Center. NUREG-1272, Vol. 8, No. 2, covers nuclear materials and presents a review of the events and concerns during 1993 associated with the use of licensed material in nonreactor applications, such as personnel overexposures and medical misadministrations. Both reports also contain a discussion of the Incident Investigation Team program and summarize both the Incident Investigation Team and Augmented Inspection Team reports. Each volume contains a list of the AEOD reports issued from 1980 through 1993

  12. Office for Analysis and Evaluation of Operational Data 1996 annual report. Volume 10, Number 1: Reactors

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-01

    This annual report of the US Nuclear Regulatory Commission`s Office for Analysis and Evaluation of Operational Data (AEOD) describes activities conducted during 1996. The report is published in three parts. NUREG-1272, Vol. 10, No. 1, covers power reactors and presents an overview of the operating experience of the nuclear power industry from the NRC perspective, including comments about trends of some key performance measures. The report also includes the principal findings and issues identified in AEOD studies over the past year and summarizes information from such sources as licensee event reports and reports to the NRC`s Operations Center. NUREG-1272, Vol. 10, No. 2, covers nuclear materials and presents a review of the events and concerns during 1996 associated with the use of licensed material in nonreactor applications, such as personnel overexposures and medical misadministrations. Both reports also contain a discussion of the Incident Investigation Team program and summarize both the Incident Investigation Team and Augmented Inspection Team reports. Each volume contains a list of the AEOD reports issued from CY 1980 through 1996. NUREG-1272, Vol. 10, No. 3, covers technical training and presents the activities of the Technical Training Center in support of the NRC`s mission in 1996.

  13. Office for Analysis and Evaluation of Operational Data 1996 annual report. Volume 10, Number 1: Reactors

    International Nuclear Information System (INIS)

    1997-12-01

    This annual report of the US Nuclear Regulatory Commission's Office for Analysis and Evaluation of Operational Data (AEOD) describes activities conducted during 1996. The report is published in three parts. NUREG-1272, Vol. 10, No. 1, covers power reactors and presents an overview of the operating experience of the nuclear power industry from the NRC perspective, including comments about trends of some key performance measures. The report also includes the principal findings and issues identified in AEOD studies over the past year and summarizes information from such sources as licensee event reports and reports to the NRC's Operations Center. NUREG-1272, Vol. 10, No. 2, covers nuclear materials and presents a review of the events and concerns during 1996 associated with the use of licensed material in nonreactor applications, such as personnel overexposures and medical misadministrations. Both reports also contain a discussion of the Incident Investigation Team program and summarize both the Incident Investigation Team and Augmented Inspection Team reports. Each volume contains a list of the AEOD reports issued from CY 1980 through 1996. NUREG-1272, Vol. 10, No. 3, covers technical training and presents the activities of the Technical Training Center in support of the NRC's mission in 1996

  14. Predictors of Post-Operative Pain Relief in Patients with Chronic Pancreatitis Undergoing the Frey or Whipple Procedure.

    Science.gov (United States)

    Sinha, Amitasha; Patel, Yuval A; Cruise, Michael; Matsukuma, Karen; Zaheer, Atif; Afghani, Elham; Yadav, Dhiraj; Makary, Martin A; Hirose, Kenzo; Andersen, Dana K; Singh, Vikesh K

    2016-04-01

    Post-operative pain relief in chronic pancreatitis (CP) is variable. Our objective was to determine clinical imaging or histopathologic predictor(s) of post-operative pain relief in CP patients undergoing the Whipple or Frey procedure. All patients who underwent a Whipple (n = 30) or Frey procedure (n = 30) for painful CP between January 2003 and September 2013 were evaluated. A toxic etiology was defined as a history of alcohol use and/or smoking. The pre-operative abdominal CT was evaluated for calcification(s) and main pancreatic duct (MPD) dilation (≥5 mm). The post-operative histopathology was evaluated for severe fibrosis. Clinical imaging and histopathologic features were evaluated as predictors of post-operative pain relief using univariable and multivariable regression analysis. A total of 60 patients (age 51.6 years, 53% males) were included in our study, of whom 42 (70%) reported post-operative pain relief over a mean follow-up of 1.1 years. There were 37 (62%) patients with toxic etiology, 36 (60%) each with calcification(s) and MPD dilation. A toxic etiology, calcifications, and severe fibrosis were associated with post-operative pain relief on univariable analysis (all p Whipple or Frey procedure.

  15. Development of Small UAS Beyond-Visual-Line-of-Sight (BVLOS Flight Operations: System Requirements and Procedures

    Directory of Open Access Journals (Sweden)

    Scott Xiang Fang

    2018-04-01

    Full Text Available Due to safety concerns of integrating small unmanned aircraft systems (UAS into non-segregated airspace, aviation authorities have required a set of detect and avoid (DAA systems to be equipped on small UAS for beyond-visual-line-of-sight (BVLOS flight operations in civil airspace. However, the development of small UAS DAA systems also requires BVLOS flights for testing and validation. To mitigate operational risks for small UAS BVLOS flight operations, this paper proposes to initially test small UAS DAA systems in BVLOS flights in a restricted airspace with additional safety features. Later, this paper further discusses the operating procedures and emergency action plans for small UAS BVLOS flight operations. The testing results show that these safety systems developed can help improve operational safety for small UAS BVLOS flight operations.

  16. Volume totalizers analysis of pipelines operated by TRANSPETRO National Operational Control Center; Analise de totalizadores de volume em oleodutos operados pelo Centro Nacional de Controle e Operacao da TRANSPETRO

    Energy Technology Data Exchange (ETDEWEB)

    Aramaki, Thiago Lessa; Montalvao, Antonio Filipe Falcao [Petrobras Transporte S.A. (TRANSPETRO), Rio de Janeiro, RJ (Brazil); Marques, Thais Carrijo [Universidade do Estado do Rio de Janeiro (UERJ), RJ (Brazil)

    2012-07-01

    This paper aims to present the results and methodology in the analysis of differences in volume totals used in systems such as batch tracking and leak detection of pipelines operated by the National Center for Operational Control (CNCO) at TRANSPETRO. In order to optimize this type of analysis, software was developed to acquisition and processing of historical data using the methodology developed. The methodology developed takes into account the particularities encountered in systems operated by TRANSPETRO, more specifically, by CNCO. (author)

  17. Evaluation of operational safety at Babcock and Wilcox Plants: Volume 2, Thermal-hydraulic results

    International Nuclear Information System (INIS)

    Wheatley, P.D.; Davis, C.B.; Callow, R.A.; Fletcher, C.D.; Dobbe, C.A.; Beelman, R.J.

    1987-11-01

    The Nuclear Regulatory Commission has initiated a research program to develop a methodology to assess the operational performance of Babcock and Wilcox plants and to apply this methodology on a trial basis. The methodology developed for analyzing Babcock and Wilcox plants integrated methods used in both thermal-hydraulics and human factors and compared results with information used in the assessment of risk. The integrated methodology involved an evaluation of a selected plant for each pressurized water reactor vendor during a limited number of transients. A plant was selected to represent each vendor, and three transients were identified for analysis. The plants were Oconee Unit 1 for Babcock and Wilcox, H.B. Robinson Unit 2 for Westinghouse, and Calvert Cliffs Unit 1 for Combustion Engineering. The three transients were a complete loss of all feedwater, a small-break loss-of-coolant accident, and a steam-generator overfill with auxiliary feedwater. Included in the integrated methodology was an assessment of the thermal-hydraulic behavior, including event timing, of the plants during the three transients. Thermal-hydraulic results are presented in this volume (Volume 2) of the report. 26 refs., 30 figs., 7 tabs

  18. The physical boundary Hilbert space and volume operator in the Lorentzian new spin-foam theory

    International Nuclear Information System (INIS)

    Ding You; Rovelli, Carlo

    2010-01-01

    A covariant spin-foam formulation of quantum gravity has been recently developed, characterized by a kinematics which appears to match well the one of canonical loop quantum gravity. In this paper we reconsider the implementation of the constraints that defines the model. We define in a simple way the boundary Hilbert space of the theory, introducing a slight modification of the embedding of the SU(2) representations into the SL(2,C) ones. We then show directly that all constraints vanish on this space in a weak sense. The vanishing is exact (and not just in the large quantum number limit). We also generalize the definition of the volume operator in the spin-foam model to the Lorentzian signature and show that it matches the one of loop quantum gravity, as in the Euclidean case.

  19. High volume hydraulic fracturing operations: potential impacts on surface water and human health.

    Science.gov (United States)

    Mrdjen, Igor; Lee, Jiyoung

    2016-08-01

    High volume, hydraulic fracturing (HVHF) processes, used to extract natural gas and oil from underground shale deposits, pose many potential hazards to the environment and human health. HVHF can negatively affect the environment by contaminating soil, water, and air matrices with potential pollutants. Due to the relatively novel nature of the process, hazards to surface waters and human health are not well known. The purpose of this article is to link the impacts of HVHF operations on surface water integrity, with human health consequences. Surface water contamination risks include: increased structural failure rates of unconventional wells, issues with wastewater treatment, and accidental discharge of contaminated fluids. Human health risks associated with exposure to surface water contaminated with HVHF chemicals include increased cancer risk and turbidity of water, leading to increased pathogen survival time. Future research should focus on modeling contamination spread throughout the environment, and minimizing occupational exposure to harmful chemicals.

  20. Impact of operator on determining functional parameters of nuclear medicine procedures.

    Science.gov (United States)

    Mohammed, A M; Naddaf, S Y; Mahdi, F S; Al-Mutawa, Q I; Al-Dossary, H A; Elgazzar, A H

    2006-01-01

    The study was designed to assess the significance of the interoperator variability in the estimation of functional parameters for four nuclear medicine procedures. Three nuclear medicine technologists with varying years of experience processed the following randomly selected 20 cases with diverse functions of each study type: renography, renal cortical scans, myocardial perfusion gated single-photon emission computed tomography (MP-GSPECT) and gated blood pool ventriculography (GBPV). The technologists used the same standard processing routines and were blinded to the results of each other. The means of the values and the means of differences calculated case by case were statistically analyzed by one-way ANOVA. The values were further analyzed using Pearson correlation. The range of the mean values and standard deviation of relative renal function obtained by the three technologists were 50.65 +/- 3.9 to 50.92 +/- 4.4% for renography, 51.43 +/- 8.4 to 51.55 +/- 8.8% for renal cortical scans, 57.40 +/- 14.3 to 58.30 +/- 14.9% for left ventricular ejection fraction from MP-GSPECT and 54.80 +/- 12.8 to 55.10 +/- 13.1% for GBPV. The difference was not statistically significant, p > 0.9. The values showed a high correlation of more than 0.95. Calculated case by case, the mean of differences +/- SD was found to range from 0.42 +/- 0.36% in renal cortical scans to 1.35 +/- 0.87% in MP-GSPECT with a maximum difference of 4.00%. The difference was not statistically significant, p > 0.19. The estimated functional parameters were reproducible and operator independent as long as the standard processing instructions were followed. Copyright 2006 S. Karger AG, Basel.