WorldWideScience

Sample records for operating experience review

  1. Continuous Air Monitor Operating Experience Review

    International Nuclear Information System (INIS)

    Cadwallader, L.C.; Bruyere, S.A.

    2008-01-01

    Continuous air monitors (CAMs) are used to sense radioactive particulates in room air of nuclear facilities. CAMs alert personnel of potential inhalation exposures to radionuclides and can also actuate room ventilation isolation for public and environmental protection. This paper presents the results of a CAM operating experience review of the DOE Occurrence Reporting and Processing System (ORPS) database from the past 18 years. Regulations regarding these monitors are briefly reviewed. CAM location selection and operation are briefly discussed. Operating experiences reported by the U.S. Department of Energy and in other literature sources were reviewed to determine the strengths and weaknesses of these monitors. Power losses, human errors, and mechanical issues cause the majority of failures. The average 'all modes' failure rate is 2.65E-05/hr. Repair time estimates vary from an average repair time of 9 hours (with spare parts on hand) to 252 hours (without spare parts on hand). These data should support the use of CAMs in any nuclear facility, including the National Ignition Facility and the international ITER experiment

  2. Magnet operating experience review for fusion applications

    International Nuclear Information System (INIS)

    Cadwallader, L.C.

    1991-11-01

    This report presents a review of magnet operating experiences for normal-conducting and superconducting magnets from fusion, particle accelerator, medical technology, and magnetohydrodynamics research areas. Safety relevant magnet operating experiences are presented to provide feedback on field performance of existing designs and to point out the operational safety concerns. Quantitative estimates of magnet component failure rates and accident event frequencies are also presented, based on field experience and on performance of similar components in other industries

  3. Operating experience review for the AP1000 plant

    International Nuclear Information System (INIS)

    Chaney, T. E.; Lipner, M. H.

    2006-01-01

    Westinghouse is performing an update to the Operating Experience Review (OER) Report for the AP1000 project to account for operating experience since December 1996. Significant Operating Experience Reports, Significant Event Reports, Significant Event Notifications, Operations and Maintenance Reminders, Topical Reports, Event Analysis Reports and Licensee Event Reports were researched for pertinent input to the update. As a part of the OER, Westinghouse has also conducted operator interviews and observations during simulated plant operations and after operating events. The main purpose of the OER is to identify Human Factors Engineering (HFE) related safety issues from existing operating plant experience and to ensure that these issues are addressed in the new design. The issues and lessons learned regarding operating experience provide a basis for improving the plant design. (authors)

  4. Stack Monitor Operating Experience Review

    International Nuclear Information System (INIS)

    Cadwallader, L.C.; Bruyere, S.A.

    2009-01-01

    Stack monitors are used to sense radioactive particulates and gases in effluent air being vented from rooms of nuclear facilities. These monitors record the levels and types of effluents to the environment. This paper presents the results of a stack monitor operating experience review of the U.S. Department of Energy (DOE) Occurrence Reporting and Processing System (ORPS) database records from the past 18 years. Regulations regarding these monitors are briefly described. Operating experiences reported by the U.S. DOE and in engineering literature sources were reviewed to determine the strengths and weaknesses of these monitors. Electrical faults, radiation instrumentation faults, and human errors are the three leading causes of failures. A representative 'all modes' failure rate is 1E-04/hr. Repair time estimates vary from an average repair time of 17.5 hours (with spare parts on hand) to 160 hours (without spare parts on hand). These data should support the use of stack monitors in any nuclear facility, including the National Ignition Facility and the international ITER project.

  5. Safety review of experiments at Albuquerque Operations Office

    International Nuclear Information System (INIS)

    Elliott, K.

    1984-01-01

    The Department of Energy (DOE) Albuquerque Operations Office is responsible for the safety overview of nuclear reactor and critical assembly facilities at Sandia National Laboratories, Los Alamos National Laboratory, and the Rocky Flats Plant. The important safety concerns with these facilities involve the complex experiments that are performed, and that is the area emphasized. A determination is made by the Albuquerque Office (AL) with assistance from DOE/OMA whether or not a proposed experiment is an unreviewed safety question. Meetings are held with the contractor to resolve and clarify questions that are generated during the review of the proposed experiment. The AL safety evaluation report is completed and any recommendations are discussed. Prior to the experiment a preoperational appraisal is performed to assure that personnel, procedures, and equipment are in readiness for operations. During the experiment, any abnormal condition is reviewed in detail to determine any safety concerns

  6. Review and updates of the risk assessment for advanced test reactor operations for operating events and experience

    International Nuclear Information System (INIS)

    Atkinson, S.A.

    1996-01-01

    Annual or biannual reviews of the operating history of the Advanced Test Reactor (ATR) at the Idaho National Engineering Laboratory (INEL) have been conducted for the purpose of reviewing and updating the ATR probabilistic safety assessment (PSA) for operating events and operating experience since the first compilation of plant- specific experience data for the ATR PSA which included data for operation from initial power operation in 1969 through 1988. This technical paper briefly discusses the means and some results of these periodic reviews of operating experience and their influence on the ATR PSA

  7. Fire protection system operating experience review for fusion applications

    International Nuclear Information System (INIS)

    Cadwallader, L.C.

    1995-12-01

    This report presents a review of fire protection system operating experiences from particle accelerator, fusion experiment, and other applications. Safety relevant operating experiences and accident information are discussed. Quantitative order-of-magnitude estimates of fire protection system component failure rates and fire accident initiating event frequencies are presented for use in risk assessment, reliability, and availability studies. Safety concerns with these systems are discussed, including spurious operation. This information should be useful to fusion system designers and safety analysts, such as the team working on the Engineering Design Activities for the International Thermonuclear Experimental Reactor

  8. Fire protection system operating experience review for fusion applications

    Energy Technology Data Exchange (ETDEWEB)

    Cadwallader, L.C.

    1995-12-01

    This report presents a review of fire protection system operating experiences from particle accelerator, fusion experiment, and other applications. Safety relevant operating experiences and accident information are discussed. Quantitative order-of-magnitude estimates of fire protection system component failure rates and fire accident initiating event frequencies are presented for use in risk assessment, reliability, and availability studies. Safety concerns with these systems are discussed, including spurious operation. This information should be useful to fusion system designers and safety analysts, such as the team working on the Engineering Design Activities for the International Thermonuclear Experimental Reactor.

  9. Cryogenic system operating experience review for fusion applications

    International Nuclear Information System (INIS)

    Cadwallader, L.C.

    1992-01-01

    This report presents a review of cryogenic system operating experiences, from particle accelerator, fusion experiment, space research, and other applications. Safety relevant operating experiences and accident information are discussed. Quantitative order-of-magnitude estimates of cryogenic component failure rates and accident initiating event frequencies are presented for use in risk assessment, reliability, and availability studies. Safety concerns with cryogenic systems are discussed, including ozone formation, effects of spills, and modeling spill behavior. This information should be useful to fusion system designers and safety analysts, such as the team working on the International Thermonuclear Experimental Reactor design

  10. Vacuum system operating experience review for fusion applications

    International Nuclear Information System (INIS)

    Cadwallader, L.C.

    1994-03-01

    This report presents a review of vacuum system operating experiences from particle accelerator, fusion experiment, space simulation chamber, and other applications. Safety relevant operating experiences and accident information are discussed. Quantitative order-of-magnitude estimates of vacuum system component failure rates and accident initiating event frequencies are presented for use in risk assessment, reliability, and availability studies. Safety concerns with vacuum systems are discussed, including personnel safety, foreign material intrusion, and factors relevant to vacuum systems being the primary confinement boundary for tritium and activated dusts. This information should be useful to fusion system designers and safety analysts, such as the team working on the Engineering Design Activities for the International Thermonuclear Experimental Reactor

  11. Ventilation Systems Operating Experience Review for Fusion Applications

    International Nuclear Information System (INIS)

    Cadwallader, L.C.

    1999-01-01

    This report is a collection and review of system operation and failure experiences for air ventilation systems in nuclear facilities. These experiences are applicable for magnetic and inertial fusion facilities since air ventilation systems are support systems that can be considered generic to nuclear facilities. The report contains descriptions of ventilation system components, operating experiences with these systems, component failure rates, and component repair times. Since ventilation systems have a role in mitigating accident releases in nuclear facilities, these data are useful in safety analysis and risk assessment of public safety. An effort has also been given to identifying any safety issues with personnel operating or maintaining ventilation systems. Finally, the recommended failure data were compared to an independent data set to determine the accuracy of individual values. This comparison is useful for the International Energy Agency task on fusion component failure rate data collection

  12. Reviewing operational experience feedback

    International Nuclear Information System (INIS)

    1991-04-01

    The purpose of this document is to provide detailed supplementary guidance to OSART experts to aid in the evaluation of operational experience feedback (OEF) programmes at nuclear power plants. The document begins by describing the objectives of an OEF programme. It goes on to indicate preparatory work and investigatory guidance for the expert. Section 5 describes attributes of an excellent OEF programme. Appended to these guidelines are examples of OEF documents from various plants. These are intended to help the expert by demonstrating the actual implementation of OEF in practice. These guidelines are in no way intended to conflict with existing national regulations and rules. A comprehensive OEF programme, as described in Section 2, would be impossible to evaluated in detail in the amount of time typically allocated for assessing OEF in an OSART review. The expert must use his or her time wisely by concentrating on those areas that appear to be the weakest

  13. Operating experience review in development of SMART MMIS

    International Nuclear Information System (INIS)

    Suh, S. M.; Jang, G. S.; Lee, J. G.; Park, G. O.; Ko, J. H.

    2004-01-01

    We have developed HFE(Human Factors Engineering) program plan for the purpose of implementing man-machine interface system in SMART plant systematically. Elements of the plan are compatible to those of NUREG-0711, Rev.1, and OER(Operating Experience Review) is one of them. The main purpose of conducting an OER as part of HFE review is to identify HFE-related safety issues. If identified, design alternatives are carefully reviewed and selected as the way of resolution for those issues. The performing model of OER is described in this paper, showing a series of works must be done to identify and resolve HFE-related issues within the scope of SMART HFE works. Then two key issues and design alternatives resolving them are presented for examples

  14. Operating experience review for nuclear power plants in the Systematic Evaluation Program

    International Nuclear Information System (INIS)

    Mays, G.T.; Harrington, K.H.

    1982-01-01

    The Systematic Evaluation Program Branch (SEPB) of the Nuclear Regulatory Commission (NRC) is conducting the Systematic Evaluation Program (SEP) whose purpose is to determine the safety margins of the design and operation of the eleven oldest operating commercial nuclear power plants in the United States. This paper describes the methodology and results of the operational experience review portion of the SEP evaluation. SEPB will combine the results from these operational reviews with other safety topic evaluations to perform an integrated assessment of the SEP plants

  15. Tritium Room Air Monitor Operating Experience Review

    Energy Technology Data Exchange (ETDEWEB)

    L. C. Cadwallader; B. J. Denny

    2008-09-01

    Monitoring the breathing air in tritium facility rooms for airborne tritium is a radiological safety requirement and a best practice for personnel safety. Besides audible alarms for room evacuation, these monitors often send signals for process shutdown, ventilation isolation, and cleanup system actuation to mitigate releases and prevent tritium spread to the environment. Therefore, these monitors are important not only to personnel safety but also to public safety and environmental protection. This paper presents an operating experience review of tritium monitor performance on demand during small (1 mCi to 1 Ci) operational releases, and intentional airborne inroom tritium release tests. The tritium tests provide monitor operation data to allow calculation of a statistical estimate for the reliability of monitors annunciating in actual tritium gas airborne release situations. The data show a failure to operate rate of 3.5E-06/monitor-hr with an upper bound of 4.7E-06, a failure to alarm on demand rate of 1.4E-02/demand with an upper bound of 4.4E-02, and a spurious alarm rate of 0.1 to 0.2/monitor-yr.

  16. PROSPER guidelines: Guidelines for peer review and for plant self-assessment of operational experience feedback process

    International Nuclear Information System (INIS)

    2003-01-01

    Effective use of operational performance information is an important element in any plant operator's arrangements for enhancing the operational safety of a nuclear power plant (NPP). This has been recognized in the IAEA Safety Fundamental, The Safety of Nuclear Installations (Safety Series No. 110). Under the technical aspects of safety, one of the principles of operation and maintenance is that the operating organization and the regulatory body shall establish complementary programmes to analyse operating experience to ensure that lessons are learned and acted upon. Such experience shall be shared with relevant national and international bodies. The Convention on Nuclear Safety, which entered into force in July 1996, also recognized the importance of operational experience feedback as a tool of high importance for the safety of nuclear plant operation and its further enhancement. It follows that the arrangements and results achieved under the operation experience feedback process in Member States will be covered by the national report under the Convention and will be subject to periodical review. These principles are further expanded in the IAEA Safety Standards Safety of Nuclear Power Plants: Operation (Safety Standard Series No. NS-R-2, year 2000) under the Feedback of The IAEA-led Peer Review of the effectiveness of the Operational Safety Performance Experience Review process (PROSPER) and associated guidelines have been developed to provide advice and assistance to utilities or individual power plants to strengthen and enhance the effectiveness of operational experience programmes in achieving these fundamental objectives. The objectives of the former IAEA Assessment of Significant Safety Events Team (ASSET) service have been expanded to include an evaluation of the effective use of all operating performance information available to the plant (e.g. external operating experience, internal low-level and near miss event reports and other relevant operating

  17. Operating experience feedback program at Olkiluoto NPP

    International Nuclear Information System (INIS)

    Kosonen, Mikko

    2002-01-01

    Recent review and development of the operating experience feedback program will be described. The development of the program has been based on several reviews by outside organizations. Main conclusions from these review reports and from the self assessment of safety performance, safety problems and safety culture on the basis of the operational events made by ASSET-method will be described. An approach to gather and analyze small events - so-called near misses - will be described. The operating experience program has been divided into internal and external operating experience. ASSET-methodology and a computer program assisting the analysis are used for the internal operating experience events. Noteworthy incidents occurred during outage are analyzed also by ASSET-method. Screening and pre analysis of the external operating experience relies on co-operation with ERFATOM, an organization of Nordic utilities for the exchange of nuclear industry experience. A short presentation on the performance of the Olkiluoto units will conclude the presentation. (author)

  18. Configuration control during plant outages. A review of operating experience

    Energy Technology Data Exchange (ETDEWEB)

    Peinador Veira, Miguel; El Kanbi, Semir [European Commission Joint Research Centre, Petten (Netherlands). Inst. for Energy and Transport; Stephan, Jean-Luc [Institut de Radioprotection et de Surete Nucleaire (IRSN), Fontenay-aux-Roses (France); Martens, Johannes [Gesellschaft fuer Anlagen- und Reaktorsicherheit (GRS) gGmbH, Koeln (Germany)

    2015-03-15

    After the occurrence of several significant events in nuclear power plants during shut-down modes of operation in the eighties, and from the results of probabilistic safety assessments completed in the nineties, it was clear that risk from low power and shutdown operational modes could not be neglected and had to be addressed by appropriate safety programs. A comprehensive review of operating experience from the last ten years has been conducted by the Joint Research Centre with the objective of deriving lessons learned and recommendations useful for nuclear regulatory bodies and utilities alike. This paper is focused on one particular challenge that any nuclear plant faces whenever it plans its next outage period: how to manage the configuration of all systems under a complex environment involving numerous concurrent activities, and how to make sure that systems are returned to their valid configuration before the plant resumes power operation. This study highlights the importance of conveying accurate but synthesized information on the status of the plant to the operators in the main control room. Many of the lessons learned are related to the alarm display in the control room and to the use of check lists to control the status of systems. Members of the industry and safety authorities may now use these recommendations and lessons learned to feed their own operating experience feedback programs, and check their applicability for specific sites.

  19. Research on the NPP human factors engineering operating experience review

    International Nuclear Information System (INIS)

    Ren Xiangchen; Miao Hongxing; Ning Zhonghe

    2006-01-01

    This paper addresses the importance of the human factors engineering (HFE) for the design of nuclear power plant (NPP), especially for the design of human-machine interface in the NPP. It also summarizes the scope and content of the NPP HFE. The function, scope, content and process of the NPP human factors engineering operating experience review (OER) are mainly focused on, and significantly discussed. Finally, it briefly introduces the situation of the studies on the OER in China. (authors)

  20. Recent U.S. reactor operating experience

    International Nuclear Information System (INIS)

    Stello, V. Jr.

    1977-01-01

    A qualitative assessment of U.S. and foreign reactor operating experience is provided. Recent operating occurrences having potentially significant safety impacts on power operation are described. An evaluation of the seriousness of each of these issues and the plans for resolution is discussed. A quantitative report on U.S. reactor operational experience is included. The details of the NRC program for evaluating and applying operating reactor experience in the regulatory process is discussed. A review is made of the adequacy of operating reactor safety and environmental margins based on actual operating experience. The Regulatory response philosophy to operating reactor experiences is detailed. This discussion indicates the NRC emphasis on the importance of a balanced action plan to provide for the protection of public safety in the national interest

  1. Operating Experience Review of Tritium-in-Water Monitors

    Energy Technology Data Exchange (ETDEWEB)

    S. A. Bruyere; L. C. Cadwallader

    2011-09-01

    Monitoring tritium facility and fusion experiment effluent streams is an environmental safety requirement. This paper presents data on the operating experience of a solid scintillant monitor for tritium in effluent water. Operating experiences were used to calculate an average monitor failure rate of 4E-05/hour for failure to function. Maintenance experiences were examined to find the active repair time for this type of monitor, which varied from 22 minutes for filter replacement to 11 days of downtime while waiting for spare parts to arrive on site. These data support planning for monitor use; the number of monitors needed, allocating technician time for maintenance, inventories of spare parts, and other issues.

  2. ERB-II operating experience

    International Nuclear Information System (INIS)

    Smith, R.N.; Cissel, D.W.; Smith, R.R.

    1977-01-01

    As originally designed and operated, EBR-II successfully demonstrated the concept of a sodium-cooled fast breeder power plant with a closed fuel reprocessing cycle (mini-nuclear park). Subsequent operation has been as an irradiation facility, a role which will continue into the foreseeable future. Since the beginning of operation in 1961, operating experience of EBR-II has been very satisfactory. Most of the components and systems have performed well. In particular, the mechanical performance of heat-removal systems has been excellent. A review of the operating experience reveals that all the original design objectives have been successfully demonstrated. To date, no failures or incidents resulting in serious in-core or out-of-core consequences have occurred. No water-to-sodium leaks have been detected over the life of the plant. At the present time, the facility is operating very well and continuously except for short shutdowns required by maintenance, refueling, modification, and minor repair. A plant factor of 76.9% was achieved for the calendar year 1976

  3. Operating experience with snubbers

    International Nuclear Information System (INIS)

    Levin, H.; Cudlin, R.

    1978-06-01

    Recent operating experience with hydraulic and mechanical snubbers has indicated that there is a need to evaluate current practice in the industry associated with snubber qualification testing programs, design and analysis procedures, selection and specification criteria, and the preservice inspection and inservice surveillance programs. The report provides a summary of operational experiences that represent problems that are generic throughout the industry. Generic Task A-13 is part of the NRC Program for the Resolution of Generic Issues Related to Nuclear Power Plants described in NUREG-0410. The report is based upon a rather large amount of data that have become available in the past four years. These data have been evaluated by the Division of Operating Reactors to develop a data base for use in connection with several NRC activities including Category A, Technical Activity A-13 (Snubbers); the Standard Review Plan; future Regulatory Guides; ASME Code Provisions; and various technical specifications of operating nuclear power plants

  4. MIT January Operational Internship Experience 2011

    Science.gov (United States)

    DeLatte, Danielle; Furhmann, Adam; Habib, Manal; Joujon-Roche, Cecily; Opara, Nnaemeka; Pasterski, Sabrina Gonzalez; Powell, Christina; Wimmer, Andrew

    2011-01-01

    This slide presentation reviews the 2011 January Operational Internship experience (JOIE) program which allows students to study operational aspects of spaceflight, how design affects operations and systems engineering in practice for 3 weeks. Topics include: (1) Systems Engineering (2) NASA Organization (3) Workforce Core Values (4) Human Factors (5) Safety (6) Lean Engineering (7) NASA Now (8) Press, Media, and Outreach and (9) Future of Spaceflight.

  5. Nuclear Power Plant Operating Experience from the IAEA/NEA International Reporting System for Operating Experience 2012-2014

    International Nuclear Information System (INIS)

    2018-03-01

    The International Reporting System for Operating Experience (IRS) is an essential element of the international operating experience feedback system for nuclear power plants. Its fundamental objective is to contribute to improving safety of commercial nuclear power plants which are operated worldwide. IRS reports contain information on events of safety significance with important lessons learned which assist in reducing recurrence of events at other plants. This sixth publication, covering the period 2012 - 2014, follows the structure of the previous editions. It highlights important lessons based on a review of the approximately 240 event reports received from the participating countries over this period.

  6. Operational experience review and methods to enhance safety and reliability in the NPP-Leibstadt (KKL)

    Energy Technology Data Exchange (ETDEWEB)

    Haeusermann, R [Kernkraftwerk Leibstadt AG, Leibstadt (Switzerland)

    1997-10-01

    In the nuclear community it became clear that an integrated feedback system of operating experience must also include the unsuccessful results. The deviations, expected to achieved performance are analysed to the failure mode and its effect. KKL has lowered the number of safety significant events since commercial operation started. The thoroughness of the review/analysis of the events has increased with high priority set to human factor induced events in operation and maintenance. Since the participation of the author in the ASSET-Mission in Smolensk in 1993, KKL introduced the ASSET-Root-Cause method and has supplemented it by the HPES (Human Performance Enhancement System). 4 refs, 6 figs.

  7. Operational experience review and methods to enhance safety and reliability in the NPP-Leibstadt (KKL)

    International Nuclear Information System (INIS)

    Haeusermann, R.

    1997-01-01

    In the nuclear community it became clear that an integrated feedback system of operating experience must also include the unsuccessful results. The deviations, expected to achieved performance are analysed to the failure mode and its effect. KKL has lowered the number of safety significant events since commercial operation started. The thoroughness of the review/analysis of the events has increased with high priority set to human factor induced events in operation and maintenance. Since the participation of the author in the ASSET-Mission in Smolensk in 1993, KKL introduced the ASSET-Root-Cause method and has supplemented it by the HPES (Human Performance Enhancement System). 4 refs, 6 figs

  8. Report of the peer review mission of national operational safety experience feedback process to the Ukraine 11-15 November 1996 Kiev

    International Nuclear Information System (INIS)

    1996-01-01

    At the invitation of the Nuclear Regulatory Administration of Ukraine (NRA), the IAEA carried out a Peer review mission of national operational safety experience feedback process at Kiev from 11 to 15 November 1996. The objective of this mission was to provide the host country, represented by the regulatory body, with independent and comprehensive review of current status of operational safety experience feedback (OSEF) process with respect to the IAEA's recommendations and international practices. The mission concluded that principal arrangements of operational feedback process in Ukraine are, at present, in force and brought positive results since their introduction. The mission also noted several good practices in these activities. 1 tab

  9. Review of operating history at the Palisades Nuclear Plant

    International Nuclear Information System (INIS)

    Mays, G.T.; Harrington, K.H.

    1982-01-01

    the Systematic Evaluation Program Branch (SEPB) of the Nuclear Regulatory Commission (NRC) is conducting the Systematic Evaluation Program whose purpose is to determine the safety margins of the design and operation of the eleven oldest operating commercial nuclear power plants in the United States. A portion of the SEP includes the compilation and interpretation of operational occurrences at these plants. This summary describes the methodology and results of the operational experience review of Palisades Nuclear Plant. The review includes a detailed examination of the operating experience in two segments - plant shutdowns and power reductions, and reportable events

  10. Operating manual for the critical experiments facility

    International Nuclear Information System (INIS)

    1986-01-01

    The operation of the Critical Experiments Facility (CEF) requires careful attention to procedures in order that all safety precautions are observed. Since an accident could release large amounts of radioactivity, careful operation and strict enforcement of procedures are necessary. To provide for safe operation, detailed procedures have been written for all phases of the operation of this facility. The CEF operating procedures are not to be construed to constitute a part ofthe Technical Specifications. In the event of any discrepancy between the information given herein and the Technical Specifications, limits set forth in the Technical Specifications apply. All normal and most emergency operation conditions are covered by procedures presented in this manual. These procedures are designed to be followed by the operating personnel. Strict adherence to these procedures is expected for the following reasons. (1) To provide a standard, safe method of performing all operations, the procedures were written by reactor engineers experienced in supervising the operation of reactors and were reviewed by an organization with over 30 years of reactor operating experience. (2) To have an up-to-date description of operating techniques available at all times for reference and review, it is necessary that the procedures be written

  11. Operating manual for the critical experiments facility

    Energy Technology Data Exchange (ETDEWEB)

    1986-01-01

    The operation of the Critical Experiments Facility (CEF) requires careful attention to procedures in order that all safety precautions are observed. Since an accident could release large amounts of radioactivity, careful operation and strict enforcement of procedures are necessary. To provide for safe operation, detailed procedures have been written for all phases of the operation of this facility. The CEF operating procedures are not to be construed to constitute a part ofthe Technical Specifications. In the event of any discrepancy between the information given herein and the Technical Specifications, limits set forth in the Technical Specifications apply. All normal and most emergency operation conditions are covered by procedures presented in this manual. These procedures are designed to be followed by the operating personnel. Strict adherence to these procedures is expected for the following reasons. (1) To provide a standard, safe method of performing all operations, the procedures were written by reactor engineers experienced in supervising the operation of reactors and were reviewed by an organization with over 30 years of reactor operating experience. (2) To have an up-to-date description of operating techniques available at all times for reference and review, it is necessary that the procedures be written.

  12. Operating experience and TPA: the Italian perspective

    International Nuclear Information System (INIS)

    Grimaldi, G.

    1990-01-01

    Collection and analysis of operating experience from the Italian plants and utilization of abroad data both to plants in operation and in construction are presented. Some results are also referred, aimed to evidence the role of the international cooperation to safe operation of nuclear plants. The approach to the Trend and Pattern analyses is described as well, and the use of computerized techniques of analysis on personal computer. Finally on going activities are introduced, specifically application of operating experience of plants in operation to small sized reactors and to ones with more intrinsic safety characteristics; review of the reporting system for future application and comparative analysis of the different realization of selected safety systems

  13. Operating experience with high beta superconducting RF cavities

    International Nuclear Information System (INIS)

    Dylla, H.F.; Doolittle, L.R.; Benesch, J.F.

    1993-01-01

    The number of installed and operational β=1 superconducting rf cavities has grown significantly over the last two years in accelerator laboratories in Europe, Japan and the U.S. The total installed acceleration capability as of mid-1993 is approximately 1 GeV at nominal gradients. Major installations at CERN, DESY, KEK and CEBAF have provided large increments to the installed base and valuable operational experience. A selection of test data and operational experience gathered to date is reviewed

  14. Operating experience with high beta superconducting rf cavities

    International Nuclear Information System (INIS)

    Dylla, H.F.; Doolittle, L.R.; Benesch, J.F.

    1993-06-01

    The number of installed and operational β = 1 superconducting rf cavities has grown significantly over the last two years in accelerator laboratories in Europe, Japan and the US. The total installed acceleration capability as of mid-1993 is approximately 1 GeV at nominal gradients. Major installations at CERN, DESY, KEK and CEBAF have provided large increments to the installed base and valuable operational experience. A selection of test data and operational experience gathered to date is reviewed

  15. Criteria for operator review of workplace changes

    International Nuclear Information System (INIS)

    Davey, E.

    2000-01-01

    A set of criteria for reviewing workplace changes has been developed for use by plant Operations staff. The criteria were developed to provide Operations staff with a practical framework for structuring assessments and subsequent review comments with regard to control room modifications and innovations that impact their work environment. The criteria were assembled from design, operations and human factors engineering principles, and system review experiences with plant Operations staff over the past ten years. Operations staff at several CANDU stations helped shape the emphasis for initial criteria definition and have assisted with criteria refinement through trial applications. Use of the criteria is expected to lead to more effective and task relevant equipment evaluations by Operations staff, and ultimately lead to system modifications and innovations that better serve plant operation needs. The paper begins with a discussion of the rationale for criteria development and the attributes of 'good' design. The balance of the paper outlines the project objectives, describes the approach applied in assembling, structuring, and refining the review criteria, and illustrates the application of the criteria in the review of a proposed control room innovation. (author)

  16. Operating experience insights supporting ageing assessments

    International Nuclear Information System (INIS)

    Nitoi, M.

    2013-01-01

    Be effective in ageing management means looking at the right aspects, with the right techniques, and one of the most effective tool which could be used for that purpose is the analysis of operating experience. The paper has as objective to perform a review of available operating experience, with the aim to provide a better picture about the impact of ageing effects. The IAEA International Reporting System and NRC Licensee Event Reports were chosen as reference databases, both databases being internationally recognized as important sources of information about events occurrences in the nuclear power plants. The ageing related events identified in the selected time window were analyzed in detail, and the contributions of each major degradation mechanisms that have induced the ageing related events (specific to each defined group of components) was represented and discussed. The paper demonstrates the possibility to use operating experience insights in highlighting the ageing effects. (authors)

  17. Human Factors Engineering (HFE) insights for advanced reactors based upon operating experience

    International Nuclear Information System (INIS)

    Higgins, J.; Nasta, K.

    1997-01-01

    The NRC Human Factors Engineering Program Review Model (HFE PRM, NUREG-0711) was developed to support a design process review for advanced reactor design certification under 10CFR52. The HFE PRM defines ten fundamental elements of a human factors engineering program. An Operating Experience Review (OER) is one of these elements. The main purpose of an OER is to identify potential safety issues from operating plant experience and ensure that they are addressed in a new design. Broad-based experience reviews have typically been performed in the past by reactor designers. For the HFE PRM the intent is to have a more focussed OER that concentrates on HFE issues or experience that would be relevant to the human-system interface (HSI) design process for new advanced reactors. This document provides a detailed list of HFE-relevant operating experience pertinent to the HSI design process for advanced nuclear power plants. This document is intended to be used by NRC reviewers as part of the HFE PRM review process in determining the completeness of an OER performed by an applicant for advanced reactor design certification. 49 refs

  18. Feedback of operating experience in nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    The feedback of operating experience of nuclear facilities to the designers, manufacturers, operators and regulators is one important means of maintaining and improving safety. The Atomic Energy Control Board`s Advisory Committee on Nuclear Safety examined the means for feedback currently being employed, how effective they are and what improvements are advisable. The review found that the need for feedback of operating experience is well recognized within those institutions contributing to the safety of CANDU power reactors, and that the existing procedures are generally effective. Some recommendations, however, are submitted for improvement in the process.

  19. Feedback of operating experience in nuclear power plants

    International Nuclear Information System (INIS)

    1995-06-01

    The feedback of operating experience of nuclear facilities to the designers, manufacturers, operators and regulators is one important means of maintaining and improving safety. The Atomic Energy Control Board's Advisory Committee on Nuclear Safety examined the means for feedback currently being employed, how effective they are and what improvements are advisable. The review found that the need for feedback of operating experience is well recognized within those institutions contributing to the safety of CANDU power reactors, and that the existing procedures are generally effective. Some recommendations, however, are submitted for improvement in the process

  20. Review of BNFL's operational experience of wet type flasks

    International Nuclear Information System (INIS)

    McWilliam, D.S.

    2004-01-01

    BNFL International Transport's operational experience includes shipping 6000te of spent fuel from Japan to Sellafield, through its dedicated terminal at Barrow, and to Cogema La Hague. This fuel was shipped under the PNTL (Pacific Nuclear Transport Ltd) banner for which BNFL is responsible. PNTL owned and operated a fleet of 5 ships for Japanese business and a fleet of 80 wet and 58 dry flasks, for the transport of Light Water Reactor (LWR) spent fuel, from both Pressurised Water Reactors (PWR) and Boiling Water Reactors (BWR). ''Wet'' or ''dry'' flask is the common terminology used to distinguish between spent fuel flasks transporting fuel where the fuel is immersed in water, or spent fuel flasks that have been drained of water and dried. This paper concentrates on the wet type of flask utilised to transport fuel to Sellafield, that is the Excellox type (including similar type NTL derivatives). It aims to provide a summary of operational experience during handling at power stations, shipment, unloading at reprocessors and from scheduled maintenance

  1. Natural uranium metallic fuel elements: fabrication and operating experience

    International Nuclear Information System (INIS)

    Hammad, F.H.; Abou-Zahra, A.A.; Sharkawy, S.W.

    1980-01-01

    The main reactor types based on natural uranium metallic fuel element, particularly the early types, are reviewed in this report. The reactor types are: graphite moderated air cooled, graphite moderated gas cooled and heavy water moderated reactors. The design features, fabrication technology of these reactor fuel elements and the operating experience gained during reactor operation are described and discussed. The interrelation between operating experience, fuel design and fabrication was also discussed with emphasis on improving fuel performance. (author)

  2. Operational experience with the Daresbury accelerator tube

    International Nuclear Information System (INIS)

    Aitken, T.W.; Eastham, D.A.; Joy, T.; Leese, J.M.; Tait, N.R.S.; Thorn, R.

    1986-01-01

    Operational experience with the Daresbury MKI accelerator tube is reviewed with particular attention to conditioning and high voltage performance. The effects of surges and transients on the tube are described and lines of future development are discussed. (orig.)

  3. US nuclear safety review and experience

    International Nuclear Information System (INIS)

    Gilinsky, V.

    1977-01-01

    The nuclear safety review of commercial nuclear power reactors has changed over the years from the relatively simple review of Dresden 1 in 1955 to the highly complex and sophisticated regulatory process which characterizes today's reviews. Four factors have influenced this evolution: (1) maturing of the technology and industry; (2) development of the regulatory process and associated staff; (3) feedback of operating experience; and (4) public awareness and participation. The NRC's safety review responsibilities start before an application is tendered and end when the plant is decommissioned. The safety review for reactor licensing is a comprehensive, two-phase process designed to assure that all the established conservative acceptance criteria are satisfied. Operational safety is assured through a strong inspection and enforcement program which includes shutting down operating facilities when necessary to protect the health and safety of the public. The safety of operating reactors is further insured through close regulation of license changes and selective backfitting of new regulatory requirements. An effective NRC standards development program has been implemented and coordinates closely with the national standards program. A confirmatory safety research program has been developed. Both of these efforts are invaluable to the nuclear safety review because they provide the staff with key tools needed to carry out its regulatory responsibilities. Both have been given increased emphasis since the formation of the NRC in 1975. The safety review process will continue to evolve, but changes will be slower and more deliberate. It will be influenced by standardization, early site reviews and development of advanced reactor concepts. New legislation may make possible changes which will simplify and shorten the regulatory process. Certainly the experience provided by the increasing number and types of operating plants will have a very strong impact on future trends in the

  4. Self-assessment as an approach to improvement of efficient implementation of Ukrainian NPP operational experience

    International Nuclear Information System (INIS)

    Pecheritsya, L.M.; Lyigots'kij, O.Yi.; Pecheritsya, O.V.; Tarasenko, V.M.

    2012-01-01

    the paper contains a brief description of the procedure for implementation of operational experience, focuses on the role of self -assessment in efficient use of operational experience, presents a review of international and national practices of self-assessment and review of the main features, issues and ways to improve self-assessment of efficient use of operational experience in Ukraine

  5. Best Practices in the Management of an Operating Experience Programme at Nuclear Power Plants

    International Nuclear Information System (INIS)

    2010-08-01

    The IAEA Fundamental Safety Principles (IAEA Safety Standards Series No. SF-1) state the need for operating organizations to establish a programme for the feedback and analysis of operating experience in nuclear power plants. Such a programme ensures that operating experience is analysed, events important to safety are reviewed in depth, lessons learned are disseminated to the staff of the organization and to the relevant national and international organizations and corrective actions are effectively implemented. In IAEA Operational Safety Review Team (OSART) and Peer Review of the effectiveness of the Operational Safety Performance Experience Review (PROSPER) missions, weaknesses in the management of operating experience (OE) programmes have been identified as one of the root causes of the recurrence of events. This publication has been developed to provide advice and assistance to nuclear installation managers and related institutions, including contractors and support organizations, to strengthen and enhance the management of their OE processes. In this publication, a number of barriers to the successful management of an OE programme have been identified. Managers are encouraged to review and evaluate these barriers with a view to identifying and eliminating them within their own organizations

  6. Program of experiments for the operating phase of the Underground Research Laboratory

    International Nuclear Information System (INIS)

    Simmons, G.R.; Bilinsky, D.M.; Davison, C.C.; Gray, M.N.; Kjartanson, B.H.; Martin, C.D.; Peters, D.A.; Lang, P.A.

    1992-09-01

    The Underground Research Laboratory (URL) is one of the major research and development facilities that AECL Research has constructed in support of the Canadian Nuclear Fuel Waste Management Program. The URL is a unique geotechnical research facility constructed in previously undisturbed plutonic rock, which was well characterized before construction. The site evaluation and construction phases of the URL project have been completed and the operating phase is beginning. A program of operating phase experiments that address AECL's objectives for in situ testing has been selected. These experiments were subjected to an external peer review and a subsequent review by the URL Experiment Committee in 1989. The comments from the external peer review were incorporated into the experiment plans, and the revised experiments were accepted by the URL Experiment Committee. Summaries of both reviews are presented. The schedule for implementing the experiments and the quality assurance to be applied during implementation are also summarized. (Author) (9 refs., 11 figs.)

  7. Industry Operating Experience Process at Krsko NPP

    International Nuclear Information System (INIS)

    Bach, B.; Bozin, B.; Cizmek, R.

    2012-01-01

    according to Corrective Action Program, which establishes guidance on the effective and efficient use of operating experience information to improve plant/personnel safety, plant reliability and commercial performance. The primary objectives of the Operating Experience Program are to promote the identification and transfer of lessons learned from internal and industry events to the plant personnel, and assure that such lessons are shared between Krsko NPP and the nuclear industry. The Operating Experience Program expects to prevent similar events from occurring at Krsko NPP by increasing plant personnel awareness of previous on-site and industry events and issues. Operating Experience Program should also identify and analyze weaknesses of the minor events and near misses in order to prevent occurrence of significant events. The purpose of this article is to present part of the Krsko NPP Operating Experience Program regarding to industry events. It will describe the methodology for receiving, processing, screening, reviewing, evaluating, status reporting, defining and implementing preventive/corrective actions in response to operating experience information of the events occurring off-site.(author).

  8. Operating Experience Review(OER) and development of Issues Tracking System(ITS) for Jordan Research and Training Reactor(JRTR)

    International Nuclear Information System (INIS)

    Kim, Yong Jun; Lee, Hyun Chul

    2011-01-01

    The operation of the Jordan Research and Training Reactor which Korean consortium designs will start in March 2015. Though the power level of JRTR is different from the one of HANARO, a Korean research reactor, experience and expertise gained from the successful operation of the multipurpose research reactor, HANARO, would be applied for the design of JRTR because the basic operation principles of two reactors are almost same. From the point of human factors view, Operating Experience Review (OER) has the accurate purpose of reflecting accumulated knowledge to a new design and this activity are required to perform in the beginning stage of the control room designs in nuclear facilities. OER is to identify human factors engineering (HFE) issues related to safety. The issues from operating experience provide a basis for improving the plant design in a timely way. Identified issues are reported to an issues tracking system (ITS) so as to manage and resolve issues. HFE related safety issues are to be extracted from OER. The purpose of this paper is to present the scope and methods of OER for the JRTR design. In addition, a new ITS is proposed. The ITS is effective for issue management and has simplified states for issue development and small numbers of steps for issue control

  9. Review of operational experience with the gas-cooled Magnox reactors of the United Kingdom Central Electricity Generating Board

    International Nuclear Information System (INIS)

    Cave, L.; Clarke, A.W.

    1984-01-01

    The paper provides a review, which is mainly of a statistical nature, of 260 reactor years of operating experience which the (United Kingdom) Central Electricity Generating Board (CEGB) has obtained with its gas-cooled, graphite moderated Magnox reactors. The main emphasis in the review is on safety rather than on availability. Data are provided on the overall incidence and frequencies of faults and it is shown that the plant items which are predominantly responsible for recorded faults are the gas circulators and the turbo-alternators. Analysis of the reactor trip experience shows that the incidence of events which necessitate an automatic shutdown of the reactor has been about one per reactor year and that of other events leading to a reactor trip has not been much higher (1.4 per reactor year). As would be expected from the length of the operating experience, some relatively rare events have occurred (expected frequency 10 -2 per reactor year, or less) but on each occasion the reactor shutdown system and decay heat removal systems functioned satisfactorily. No overheating of, or damage to, the fuel occurred as a result of these rare events or of other, more frequent, faults. Analysis of the trend of failure rates has shown an improvement with time in nearly all safety-related items and external inspection of the primary coolant circuits has shown no significant deterioration with time. However, some derating of the reactors has been necessary to reduce the effects of oxidation of mild steel in CO 2 , in order to obtain optimum service lives. In spite of major differences between the systems, a comparison of the failure rates of analogous systems and plant items in PWRs and the Magnox reactors show a considerable similarity. Overall, the review of CEGB's operational experience with its Magnos reactors has shown that the frequencies of faults in systems and plant items has been satisfyingly low. (author)

  10. High Performance Computing Operations Review Report

    Energy Technology Data Exchange (ETDEWEB)

    Cupps, Kimberly C. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2013-12-19

    The High Performance Computing Operations Review (HPCOR) meeting—requested by the ASC and ASCR program headquarters at DOE—was held November 5 and 6, 2013, at the Marriott Hotel in San Francisco, CA. The purpose of the review was to discuss the processes and practices for HPC integration and its related software and facilities. Experiences and lessons learned from the most recent systems deployed were covered in order to benefit the deployment of new systems.

  11. Periodic Safety Review of Nuclear Power Plants: Experience of Member States

    International Nuclear Information System (INIS)

    2010-04-01

    Routine reviews of nuclear power plant operation (including modifications to hardware and procedures, operating experience, plant management and personnel competence) and special reviews following major events of safety significance are the primary means of safety verification. In addition, many Member States of the IAEA have initiated systematic safety reassessments, termed periodic safety reviews, of nuclear power plants, to assess the cumulative effects of plant ageing and plant modifications, operating experience, technical developments and siting aspects. The reviews include an assessment of plant design and operation against current safety standards and practices, and they have the objective of ensuring a high level of safety throughout the plant's operating lifetime. They are complementary to the routine and special safety reviews and do not replace them. Periodic safety reviews of nuclear power plants are considered an effective way to obtain an overall view of actual plant safety, and to determine reasonable and practical modifications that should be made in order to maintain a high level of safety. They can be used as a means of identifying time limiting features of the plant in order to determine nuclear power plant operation beyond the designed lifetime. The periodic safety review process can be used to support the decision making process for long term operation or licence renewal. Since 1994, the use of periodic safety reviews by Member States has substantially broadened and confirmed its benefits. Periodic safety review results have, for example, been used by some Member States to help provide a basis for continued operation beyond the current licence term, to communicate more effectively with stakeholders regarding nuclear power plant safety, and to help identify changes to plant operation that enhance safety. This IAEA-TECDOC is intended to assist Member States in the implementation of a periodic safety review. This publication complements the

  12. Commissioning and Operational Experience in Power Reactor Fuel Reprocessing Plant

    Energy Technology Data Exchange (ETDEWEB)

    Pradhan, S., E-mail: spradhan@barctara.gov.in [Tarapur Based Reprocessing Plant, Bhabha Atomic Research Centre, Tarapur (India)

    2014-10-15

    After completing design, construction, commissioning, operation and maintenance experience of the reprocessing plants at Tarapur, Mumbai and Kalpakkam a new reprocessing plant is commissioned and put into operation at BARC, Tarapur since 2011. Subsequent to construction clearance, commissioning of the plant is taken in many steps with simultaneous review by design and safety committees. In spite of vast experience, all the staff was retrained in various aspects of process and utility operations and in operation of innovative changes incorporated in the design. Operating personnel are licensed through an elaborate procedure consisting of various check lists followed by personnel interview. Commissioning systems were divided in sub-systems. Sub-systems were commissioned independently and later integrated testing was carried out. For commissioning, extreme operating conditions were identified in consultation with designers and detailed commissioning procedures were made accordingly. Commissioning was done in different conditions to ensure safety, smooth operation and maintainability. Few modifications were carried out based on commissioning experience. Technical specifications for operation of the plant are made in consultation with designers and reviewed by safety committees. Operation of the plant was carried out after successful commissioning trials with Deep Depleted Uranium (DDU). Emergency operating procedures for each design basis accident were made. Performance of various systems, subsystems are quite satisfactory and the plant has given very good capacity factor. (author)

  13. Operability design review of prototype large breeder reactor (PLBR) designs. Final report, September 1981

    International Nuclear Information System (INIS)

    Beakes, J.H.; Ehman, J.R.; Jones, H.M.; Kinne, B.V.T.; Price, C.M.; Shores, S.P.; Welch, J.K.

    1981-09-01

    Prototype Large Breeder Reactor (PLBR) designs were reviewed by personnel with extensive power plant operations experience. Fourteen normal and off-normal events, such as startup, shutdown, refueling, reactor scram and loss of feedwater, were evaluated using an operational evaluation methodology which is designed to facilitate talk-through sessions on operational events. Human factors engineers participated in the review and assisted in developing and refining the review methodologies. Operating experience at breeder reactor facilities such as Experimental Breeder Reactor-II (EBR-II), Enrico Fermi Atomic Power Plant - Unit 1, and the Fast Flux Test Facility (FFTF) was gathered, analyzed, and used to determine whether lessons learned from operational experience had been incorporated into the PLBR designs. This eighteen month effort resulted in approximately one hundred specific recommendations for improving the operability of PLBR designs

  14. Operating experience feedback report: Experience with pump seals installed in reactor coolant pumps manufactured by Byron Jackson

    International Nuclear Information System (INIS)

    Bell, L.G.; O'Reilly, P.D.

    1992-09-01

    This report examines the reactor coolant pump (RCP) seal operating experience through August 1990 at plants with Byron Jackson (B-J) RCPs. ne operating experience examined in this analysis included a review of the practice of continuing operation with a degraded seal. Plants with B-J RCPs that have had relatively good experience with their RCP seals attribute this success to a combination of different factors, including: enhanced seal QA efforts, modified/new seal designs, improved maintenance procedures and training, attention to detail, improved seal operating procedures, knowledgeable personnel involved in seal maintenance and operation, reduction in frequency of transients that stress the seals, seal handling and installation equipment designed to the appropriate precision, and maintenance of a clean seal cooling water system. As more plants have implemented corrective measures such as these, the number of B-J RCP seal failures experienced has tended to decrease. This study included a review of the practice of continued operation with a degraded seal in the case of PWR plants with Byron Jackson reactor coolant pumps. Specific factors were identified which should be addressed in order to safety manage operation of a reactor coolant pump with indications of a degrading seal

  15. Recent operating experience and improvement of commercial IGCC

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-09-01

    IGCC has today reached a status where experience is available from first and second generation plants, built in the 1970s/1980s and in the 1990s respectively, as commercial-scale demonstration plants for coal-based applications. These plants feature variations on gasification technology and subsequent environmental controls and in operating them a number of technical and commercial lessons have been learned that will help to improve the next generation of IGCC projects. The report reviews and summarises the state-of-the-art and operating experience of several commercial IGCC plants worldwide, setting out the lessons learned and plans for future development embracing such issues as the changes or modifications to plant made to overcome the operational problems and to improve the reliability and availability of the plant. Since IGCC is considered a 'capture ready' technology for CO2 abatement, the current status with regard to the incorporation of carbon capture and storage systems (CCS) has been reviewed. Finally, the report outlines the issues associated with assessing the risks in commercialising IGCC plant.

  16. Lessons Learned from Missing Flooding Barriers Operating Experience

    International Nuclear Information System (INIS)

    Simic, Z.; Veira, M. P.

    2016-01-01

    Flooding hazard is highly significant for nuclear power plant safety because of its potential for common cause impact on safety related systems, and because operating experience reviews regularly identify flooding as a cause of concern. Source of the flooding could be external (location) or internal (plant design). The amount of flooding water could vary but even small amount might suffice to affect redundant trains of safety related systems for power supply and cooling. The protection from the flooding is related to the design-basis flood level (DBFL) and it consists of three elements: structural, organizational and accessibility. Determination of the DBFL is critical, as Fukushima Daiichi accident terribly proved. However, as the topic of flooding is very broad, the scope of this paper is focused only on the issues related to the missing flood barriers. Structural measures are physically preventing flooding water to reach or damage safety related system, and they could be permanent or temporary. For temporary measures it is important to have necessary material, equipment and organizational capacity for the timely implementation. Maintenance is important for permanent protection and periodical review is important for assuring readiness and feasibility of temporary flooding protection. Final flooding protection element is assured accessibility to safety related systems during the flooding. Appropriate flooding protection is based on the right implementation of design requirements, proper maintenance and periodic reviews. Operating experience is constantly proving how numerous water sources and systems interactions make flooding protection challenging. This paper is presenting recent related operating experience feedback involving equipment, procedures and analysis. Most frequent deficiencies are: inadequate, degraded or missing seals that would allow floodwaters into safety related spaces. Procedures are inadequate typically because they underestimate necessary

  17. From USA operation experience of industrial uranium-graphite reactors

    International Nuclear Information System (INIS)

    Burdakov, N.S.

    1996-01-01

    The review on materials, presented by a group of the USA specialists at the seminar in Moscow on October 9-11, 1995 is considered. The above specialists shared their experience in operation of the Hanford industrial reactors, aimed at plutonium production for atomic bombs. The purpose of the above visit consisted in providing assistance to the Russian specialists by evaluation and modernization of operational conditions safety improvement of the RBMK type reactors. Special attention is paid to the behaviour of the graphite lining and channel tubes with an account of possible channel power interaction with the reactor structural units. The information on the experience of the Hanford reactor operation may be useful for specialists, operating the RBMK type reactors

  18. CANDU operating experience

    International Nuclear Information System (INIS)

    McConnell, L.G.; Woodhead, L.W.; Fanjoy, G.R.; Thurygill, E.W.

    1980-05-01

    The CANDU-PHW program is based upon 38 years of heavy water reactor experience with 35 years of operating experience. Canada has had 72 reactor years of nuclear-electric operations experience with 10 nuclear units in 4 generating stations during a period of 18 years. All objectives have been met with outstanding performance: worker safety, public safety, environmental emissions, reliable electricity production, and low electricity cost. The achievement has been realized through total teamwork involving all scientific disciplines and all project functions (research, design, manufacturing, construction, and operation). (auth)

  19. Spacelab operations planning. [ground handling, launch, flight and experiments

    Science.gov (United States)

    Lee, T. J.

    1976-01-01

    The paper reviews NASA planning in the fields of ground, launch and flight operations and experiment integration to effectively operate Spacelab. Payload mission planning is discussed taking consideration of orbital analysis and the mission of a multiuser payload which may be either single or multidiscipline. Payload analytical integration - as active process of analyses to ensure that the experiment payload is compatible to the mission objectives and profile ground and flight operations and that the resource demands upon Spacelab can be satisfied - is considered. Software integration is touched upon and the major integration levels in ground operational processing of Spacelab and its experimental payloads are examined. Flight operations, encompassing the operation of the Space Transportation System and the payload, are discussed as are the initial Spacelab missions. Charts and diagrams are presented illustrating the various planning areas.

  20. Operating experience feedback

    International Nuclear Information System (INIS)

    Cimesa, S.

    2007-01-01

    Slovenian Nuclear Safety Administration (SNSA) has developed its own system for tracking, screening and evaluating the operating experiences of the nuclear installations. The SNSA staff regularly tracks the operating experiences throughout the world and screens them on the bases of applicability for the Slovenian nuclear facilities. The operating experiences, which pass the screening, are thoroughly evaluated and also recent operational events in these facilities are taken into account. If needed, more information is gathered to evaluate the conditions of the Slovenian facilities and appropriate corrective actions are considered. The result might be the identification of the need for modification at the licensee, the need for modification of internal procedures in the SNSA or even the proposal for the modification of regulations. Information system helps everybody to track the process of evaluation and proper logging of activities. (author)

  1. Experience gained in enhancing operational safety at ComEd's nuclear power plants

    International Nuclear Information System (INIS)

    Elias, D.

    1997-01-01

    The following aspects of experience gained in enhancing operational safety at Comed's nuclear power plants are discussed: nuclear safety policy; centralization/decentralization; typical nuclear operating organization; safety review boards; human performance enhancement; elements of effective nuclear oversight

  2. Operating Experience at NPP Krsko

    International Nuclear Information System (INIS)

    Kavsek, D.; Bach, B.

    1998-01-01

    Systematic analysis of operational experience by assessment of internal and industry events and the feedback of lessons learned is one of the essential activities in the improvement of the operational safety and reliability of the nuclear power plant. At NPP Krsko we have developed a document called ''Operating Experience Assessment Program''. Its purpose is to establish administrative guidance for the processing of operating events including on-site and industry events. Assessment of internal events is based on the following methods: Event and Causal Factor Charting, Change Analysis, Barrier Analysis, MORT (Management Oversight and Risk Tree Analysis) and Human Performance Evaluation. The operating experience group has developed a sophisticated program entitled ''Operating experience tracking system'' (OETS) in response to the need for a more efficient way of processing internal and industry operating experience information. The Operating Experience Tracking System is used to initiate and track operational events including recommended actions follow up. Six screens of the system contain diverse essential information which allows tracking of operational events and enables different kinds of browsing. OETS is a part of the NPP Krsko nuclear network system and can be easily accessed by all plant personnel. (author)

  3. SALTO Peer Review Guidelines. Guidelines for Peer Review of Safety Aspects of Long Term Operation of Nuclear Power Plants

    International Nuclear Information System (INIS)

    2014-01-01

    International peer review is a useful tool for Member States to exchange experiences, learn from each other and apply good practices in the long term operation (LTO) of nuclear power plants (NPPs). The peer review is also an important mechanism through which the IAEA supports Member States in enhancing the safety of NPPs. The IAEA has conducted various types of safety review that indirectly address aspects of LTO, including safety reviews for design, engineering, operation and external hazards. Operational Safety Review Team (OSART) services include review of ageing management programmes. In addition, several Member States have requested Ageing Management Assessment Team (AMAT) missions. Through these experiences, it was recognized that a comprehensive peer review on LTO would be very useful to Member States. The Safety Aspects of Long Term Operation (SALTO) peer review addresses strategy and key elements for the safe LTO of NPPs, which includes AMAT objectives and complements OSART reviews. The SALTO peer review is designed to assist operating organizations in adopting a proper approach to LTP including implementing appropriate activities to ensure that plant safety will be maintained during the LTO period. The SALTO peer review can be tailored to focus on ageing management programmes (AMPs) or on other activities related to LTO to support the Member State in enhancing the safety of its NPPs. The SALTO peer review can also support regulators in establishing or improving regulatory and licensing strategies for the LTO of NPPs. The guidelines in this publication are primarily intended for members of a SALTO review team and provide a basic structure and common reference for peer reviews of LTO. Additionally, the guidelines also provide useful information to the operating organizations of NPPs (or technical support organizations) for carrying out their own self-assessments or comprehensive programme reviews. The guidelines are intended to be generic, as there are

  4. Operational and reliability experience with reactor instrumentation

    International Nuclear Information System (INIS)

    Dixon, F.; Gow, R.S.

    1978-01-01

    In the last 15 years the CEGB has experienced progressive plant development, integration and changes in operating regime through nine nuclear (gas-cooled reactor) power stations with corresponding instrumentation advances leading towards more refined centralized control. Operation and reliability experience with reactor instrumentation is reported in this paper with reference to the progressive changes related to the early magnox, late magnox and AGR periods. Data on instrumentation reliability in terms of reactor forced outages are presented and show that the instrumentation contributions to loss of generating plant availability are small. Reactor safety circuits, neutron flux and temperature measurements, gas analysis and vibration monitoring are discussed. In reviewing the reactor instrumentation the emphasis is on reporting recent experience, particularly on AGR equipment, but overall performance and changes to magnox equipment are included so that some appreciation can be obtained of instrumentation requirements with respect to plant lifetimes. (author)

  5. Operating experience and aging-seismic assessment of electric motors

    International Nuclear Information System (INIS)

    Subudhi, M.; Burns, E.L.; Taylor, J.H.

    1985-06-01

    Objectives of this program are to identify concerns related to the aging and service wear of equipment operating in nuclear power plants, to assess their possible impact on plant safety, to identify effective inspection surveillance and monitoring methods and to recommend suitable maintenance practices for mitigating aging related concerns and diminish the rate of degradation due to aging and service wear. Motor design and materials of construction are reviewed to identify age-sensitive components. Operational and accidental stressors are determined, and their effect on promoting aging degradation is assessed. Failure modes, mechanisms, and causes have been reviewed from operating experiences and existing data banks. The study has also included consideration for the seismic correlation of age-degraded motor components. The aforementioned reviews and assessments were assimilated to characterize the dielectric, rotational, and mechanical hazards on motor performance and operational readiness. The functional indicators which can be monitored to assess motor component deterioration due to aging or other accidental stressors are identified. Conforming with the NPAR strategy as outlined in the program plan, the study also includes a preliminary discussion of current standards and guides, maintenance programs, and research activities pertaining to nuclear power plant safety-related electric motors

  6. Review of operating experience at the Los Alamos Plutonium Electrorefining Facility, 1963-1977

    International Nuclear Information System (INIS)

    Mullins, L.J.; Morgan, A.N.

    1981-12-01

    This report reviews the operation of the Los Alamos Plutonium Electrorefining Plant at Technical Area 21 for the period 1964 through 1977. During that period, approximately 1568 kg of plutonium metal, > 99.95% pure, was produced in 653 runs from 1930 kg of metal fabrication scrap, 99% pure. General considerations of the electrorefining process and facility operation and recommendations for further improvement of the process are discussed

  7. Simulator experiments: effects of NPP operator experience on performance

    International Nuclear Information System (INIS)

    Beare, A.N.; Gray, L.H.

    1985-01-01

    Experiments are being conducted on nuclear power plant (NPP) control room training simulators by the Oak Ridge National Laboratory, its subcontractor, General Physics Corporation, and participating utilities. The experiments are sponsored by the Nuclear Regulatory Commission's (NRC) Human Factors and Safeguards Branch, Division of Risk Analysis and Operations, and are a continuation of prior research using simulators, supported by field data collection, to provide a technical basis for NRC human factors regulatory issues concerned with the operational safety of nuclear power plants. During the FY83 research, a simulator experiment was conducted at the control room simulator for a GE boiling water reactor (BWR) NPP. The research subjects were licensed operators undergoing requalification training and shift technical advisors (STAs). This experiment was designed to investigate the effects of (a) senior reactor operator (SRO) experience, (b) operating crew augmentation with an STA and (c) practice, as a crew, upon crew and individual operator performance, in response to anticipated plant transients. The FY84 experiments are a partial replication and extension of the FY83 experiment, but with PWR operators and simulator. Methodology and results to date are reported

  8. Operational experience of a large area x-ray camera for protein crystallography

    International Nuclear Information System (INIS)

    Joachimiak, A.; Jorden, A. R.; Loeffen, P. W.; Naday, I.; Sanishvili, R.; Westbrook, E. M.

    1999-01-01

    After 3 years experience of operating very large area (210mm x 210mm) CCD-based detectors at the Advanced Photon Source, operational experience is reported. Four such detectors have been built, two for Structural Biology Center (APS-1 and SBC-2), one for Basic Energy Sciences Synchrotrons Radiation Center (Gold-2) at Argonne National Laboratory's Advanced Photon Source and one for Osaka University by Oxford Instruments, for use at Spring 8 (PX-21O). The detector is specifically designed as a high resolution and fast readout camera for macromolecular crystallography. Design trade-offs for speed and size are reviewed in light of operational experience and future requirements are considered. Operational data and examples of crystallography data are presented, together with plans for more development

  9. Experience gained in enhancing operational safety at ComEd`s nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Elias, D [Commonwealth Edison Co. (United States)

    1997-09-01

    The following aspects of experience gained in enhancing operational safety at Comed`s nuclear power plants are discussed: nuclear safety policy; centralization/decentralization; typical nuclear operating organization; safety review boards; human performance enhancement; elements of effective nuclear oversight.

  10. Cernavoda NPP Unit 1: Operating experience program and plant specific performance indicators (level 2)

    International Nuclear Information System (INIS)

    Teodor, Vasile; Popa, Viorel

    1998-01-01

    The basis for the Operating Experience Program was set in place since early stages of the commissioning phase (1993), when a system based on the Canadian approach was implemented for reporting, reviewing, assessing and establishing of the necessary corrective action for unplanned events. This system provided excellent opportunity to train staff in unplanned event assessment methodology, and prepare the station for the formal reporting process following criticality in accordance with the licensing requirements. The formal process, set in place after criticality is described in Station Instruction Procedure SI-01365-P13 'Unplanned Event Report' and was developed under the supervision of Safety and Compliance Department. In parallel, a program for information exchange and trending of performance indicators was developed by Technical Services Department. The WANO recommendations following August 1997 Peer Review provided the opportunity for a better understanding and reconsideration of the Operating Experience Program. As a result, all the activities related to this topic were assigned to a new structure, within Safety and Compliance Department. As such an Operating Experience Group was created and a new program is now being developed in an integrated and centralized manner. The content of the paper is the following: - Overview; - Operating Experience Program; - Event Analysis (Unplanned Events Assessment System - UEIR Process- and Systematic Analysis of Operational Events - ACR Process); - Information Exchange Program; - Monitoring of Operating Experience - Plant Specific Performance Indicators; - Purpose; - Level 2 Performance Indicators. Four appendices are added containing: - A. Station performance indicators/targets (Level 2); - B. SPI (Station Performance Indicators - Level 2) - Graphics; - C. UEIR, LRS (Safety and Licensing Review Sheet), UEFR (Unplanned Event Follow-up Report), ACR and OPEX forms. (authors)

  11. Peer Reviews: a voluntary means of enhancing operating culture

    International Nuclear Information System (INIS)

    Vella, R.

    1996-01-01

    In the nuclear energy industry, and also in other fields, excellent experience has been gained from the regular accumulation of expert evidence of power station operation through external organizations or teams. In 1991, the World Association of Nuclear Operations (WANO) initiated a pilot programme for voluntary 'Peer Reviews'. The success of this first exercise in gathering expert evidence led to the introduction of the 'Peer Review' programme in 1993 as one of the standard programmes of WANO. The object was to increase the safety and reliability of nuclear power stations throughout the world. WANO Peer Reviews are voluntary and are carried out at the request of a member. They are oriented towards special WANO performance objectives and criteria, which have been established by the management of WANO. (orig.) [de

  12. Review of thorium fuel reprocessing experience

    International Nuclear Information System (INIS)

    Brooksbank, R.E.; McDuffee, W.T.; Rainey, R.H.

    1978-01-01

    The review reveals that experience in the reprocessing of irradiated thorium materials is limited. Plants that have processed thorium-based fuels were not optimized for the operations. Previous demonstrations of several viable flowsheets provide a sound technological base for the development of optimum reprocessing methods and facilities. In addition to the resource benefit by using thorium, recent nonproliferation thrusts have rejuvenated an interest in thorium reprocessing. Extensive radiation is generated as the result of 232 U-contamination produced in the 233 U, resulting in the remote operation and fabrication operations and increased fuel cycle costs. Development of the denatured thorium flowsheet, which is currently of interest because of nonproliferation concerns, represents a difficult technological challenge

  13. Applying operating experience to design the CANDU 3 process

    International Nuclear Information System (INIS)

    Harris, D.S.; Hinchley, E.M.; Pauksens, J.; Snell, V.; Yu, S.K.W.

    1991-01-01

    The CANDU 3 is an advanced, smaller (450 MWe), standardized version of the CANDU now being designed for service later in the decade and beyond. The design of this evolutionary nuclear power plant has been carefully planned and organized to gain maximum benefits from new technologies and from world experience to date in designing, building, commissioning and operating nuclear power stations. The good performance record of existing CANDU reactors makes consideration of operating experience from these plants a particularly vital component of the design process. Since the completion of the first four CANDU 6 stations in the early 1980s, and with the continuing evolution of the multi-unit CANDU station designs since then, AECL CANDU has devised several processes to ensure that such feedback is made available to designers. An important step was made in 1986 when a task force was set up to review and process ideas arising from the commissioning and early operation of the CANDU 6 reactors which were, by that time, operating successfully in Argentina and Korea, as well as the Canadian provinces of Quebec and New Brunswick. The task force issued a comprehensive report which, although aimed at the design of an improved CANDU 6 station, was made available to the CANDU 3 team. By that time also, the Institute of Power Operations (INPO) in the U.S., of which AECL is a Supplier Participant member, was starting to publish Good Practices and Guidelines related to the review and the use of operating experiences. In addition, details of significant events were being made available via the INPO SEE-IN (Significant Event Evaluation and Information Network) Program, and subsequently the CANNET network of the CANDU Owners' Group (COG). Systematic review was thus possible by designers of operations reports, significant event reports, and related documents in a continuing program of design improvement. Another method of incorporating operations feedback is to involve experienced utility

  14. Applying operating experience to design the CANDU 3 process

    Energy Technology Data Exchange (ETDEWEB)

    Harris, D S; Hinchley, E M; Pauksens, J; Snell, V; Yu, S K.W. [AECL-CANDU, Ontario (Canada)

    1991-04-01

    The CANDU 3 is an advanced, smaller (450 MWe), standardized version of the CANDU now being designed for service later in the decade and beyond. The design of this evolutionary nuclear power plant has been carefully planned and organized to gain maximum benefits from new technologies and from world experience to date in designing, building, commissioning and operating nuclear power stations. The good performance record of existing CANDU reactors makes consideration of operating experience from these plants a particularly vital component of the design process. Since the completion of the first four CANDU 6 stations in the early 1980s, and with the continuing evolution of the multi-unit CANDU station designs since then, AECL CANDU has devised several processes to ensure that such feedback is made available to designers. An important step was made in 1986 when a task force was set up to review and process ideas arising from the commissioning and early operation of the CANDU 6 reactors which were, by that time, operating successfully in Argentina and Korea, as well as the Canadian provinces of Quebec and New Brunswick. The task force issued a comprehensive report which, although aimed at the design of an improved CANDU 6 station, was made available to the CANDU 3 team. By that time also, the Institute of Power Operations (INPO) in the U.S., of which AECL is a Supplier Participant member, was starting to publish Good Practices and Guidelines related to the review and the use of operating experiences. In addition, details of significant events were being made available via the INPO SEE-IN (Significant Event Evaluation and Information Network) Program, and subsequently the CANNET network of the CANDU Owners' Group (COG). Systematic review was thus possible by designers of operations reports, significant event reports, and related documents in a continuing program of design improvement. Another method of incorporating operations feedback is to involve experienced utility

  15. Canadian fuel development program and recent operational experience

    International Nuclear Information System (INIS)

    Cox, D.S.; Kohn, E.; Lau, J.H.K.; Dicke, G.J.; Macici, N.N.; Sancton, R.W.

    1995-01-01

    This paper provides an overview of the current Canadian CANDU fuel R and D programs and operational experience. The details of operational experience for fuel in Canadian reactors are summarized for the period 1991-1994; excellent fuel performance has been sustained, with steady-state bundle defect rates currently as low as 0.02%. The status of introducing long 37-element bundles, and bundles with rounded bearing pads is reviewed. These minor changes in fuel design have been selectively introduced in response to operational constraints (end-plate cracking and pressure-tube fretting) at Ontario Hydro's Bruce-B and Darlington stations. The R and D programs are generating a more complete understanding of CANDU fuel behaviour, while the CANDU Owners Group (COG) Fuel Technology Program is being re-aligned to a more exclusive focus on the needs of operating stations. Technical highlights and realized benefits from the COG program are summarized. Re-organization of AECL to provide a one-company focus, with an outward looking view to new CANDU markets, has strengthened R and D in advanced fuel cycles. Progress in AECL's key fuel cycle programs is also summarized. (author)

  16. Operating experience feedback in TVO

    Energy Technology Data Exchange (ETDEWEB)

    Piirto, A [Teollisuuden Voima Oy (Finland)

    1997-12-31

    TVO is a power company operating with two 710 MW BWR units at Olkiluoto. For operating experience feedback TVO has not established a separate organizational unit but rather relies on a group of persons representing various technical disciplines. The ``Operating Experience Group`` meets at about three-week intervals to handle the reports of events (in plant and external) which have been selected for handling by an engineer responsible for experience feedback. 7 charts.

  17. Nuclear units operating improvement by using operating experience

    International Nuclear Information System (INIS)

    Rotaru, I.; Bilegan, I.C.

    1997-01-01

    The paper presents how the information experience can be used to improve the operation of nuclear units. This areas include the following items: conservative decision making; supervisory oversight; teamwork; control room distraction; communications; expectations and standards; operator training and fundamental knowledge, procedure quality and adherence; plant status awareness. For each of these topics, the information illustrate which are the principles, the lessons learned from operating experience and the most appropriate exemplifying documents. (authors)

  18. Fast reactor operating experience gained in Russia: Analysis of anomalies and abnormal operation cases

    International Nuclear Information System (INIS)

    Ashurko, Y.M.; Baklushin, R.P.; Zagorulko, Y.I.; Ivanenko, V.N.; Matveyev, V.P.; Vasilyev, B.A.

    2000-01-01

    Review of various anomalous events and abnormal operation experience gained in the process of Russian fast reactors operation is given in the paper. The main information refers to the BN-600 demonstration reactor operation. Statistical data on sodium leaks and steam generator failures are presented, and sources of these events and countermeasures taken to avoid their appearance on the operating reactors as well as related changes made in the BN-800 reactor design are considered. In the paper, some features of impurities behaviour are considered in various modes of the BN-600 reactor operation. Information is given on the impurities ingress into the circuits, on abnormal situation emerged in the process of the BN-600 reactor operation and its probable cause. Information is presented on the event related to the increased torque of the BN-600 reactor central rotating column and repair works performed. (author)

  19. Application of operating experience in environmental qualification program

    International Nuclear Information System (INIS)

    Lee, S.Y.; Wise, R.

    2000-01-01

    Environmental qualification (EQ) of equipment related to nuclear safety has been carried out in the nuclear community since the 70's. It started with electrical equipment and then expanded to include mechanical equipment. During this evolutionary process, the methods used for EQ have gone through a long period of refinement and clarification. Prior to 1971, qualification for equipment in licensed nuclear power plants was based on the use of electrical components of commonly accepted high industrial quality without the benefit of specific environmental qualification standards. Between 1971 and 1974, most plants used the criteria of IEEE Standard 323-1971 as the basis for demonstrating qualification. Also during this period related 'daughter' standards, mainly by IEEE, became available which addressed qualification for specific equipment items. After July 1974, plants were required to meet the more comprehensive guidelines specified in IEEE Standard 323-1974 and the related 'daughter' standards. IEEE Standard 323-1974 later evolved into IEEE Standard 323-1983. For nuclear power plants built in Ontario during the 70's, i.e. Pickering B and Bruce B, has included the environmental qualification requirements in their respective nuclear safety design guides. It is now recognized that they are not up to the current EQ standards. Darlington, constructed during the 80's, implemented the environmental qualification program in its project. An Environmental Qualification (EQ) Program is now under way in Ontario Power Generation (OPG) to formally implement the Environmental Qualification for Bruce B, Pickering B, and Pickering A and to preserve the Qualification for Darlington G.S. This paper makes a thorough a review of the standard methods used in the past by utilities for environmental qualification. These methods include type testing, analysis, and operating experience. Both type testing and analysis have been clearly defined in standards listed in References [2] to [6] and

  20. Regulatory challenges in using nuclear operating experience

    International Nuclear Information System (INIS)

    2006-01-01

    There can be no doubt that the systematic evaluation of operating experience by the operator and the regulator is essential for continued safe operation of nuclear power plants. Recent concerns have been voiced that the operating experience information and insights are not being used effectively to promote safety. If these concerns foreshadow a real trend in OECD countries toward complacency in reporting and analysing operating events and taking corrective actions, then past experience suggests that similar or even more serious events will recur. This report discusses how the regulator can take actions to assure that operators have effective programmes to collect and analyse operating experience and, just as important, for taking steps to follow up with actions to prevent the events and conditions from recurring. These regulatory actions include special inspections of an operator operating experience programme and discussion with senior plant managers to emphasize the importance of having an effective operating experience programme. In addition to overseeing the operator programmes, the regulator has the broader responsibility for assuring that industry-wide trends, both national and international are monitored. To meet these responsibilities, the regulatory body must have its own operating experience programme, and this report discusses the important attributes of such regulatory programmes. It is especially important for the regulator to have the capability for assessing the full scope of operating experience issues, including those that may not be included in an operator operating experience programme, such as new research results, international operating experience, and broad industry trend information. (author)

  1. Simulator experiments: effects of NPP operator experience on performance

    International Nuclear Information System (INIS)

    Beare, A.N.; Gray, L.H.

    1984-01-01

    During the FY83 research, a simulator experiment was conducted at the control room simulator for a GE Boiling Water Reactor (BWR) NPP. The research subjects were licensed operators undergoing requalification training and shift technical advisors (STAs). This experiment was designed to investigate the effects of senior reactor operator (SRO) experience, operating crew augmentation with an STA and practice, as a crew, upon crew and individual operator performance, in response to anticipated plant transients. Sixteen two-man crews of licensed operators were employed in a 2 x 2 factorial design. The SROs leading the crews were split into high and low experience groups on the basis of their years of experience as an SRO. One half of the high- and low-SRO experience groups were assisted by an STA. The crews responded to four simulated plant casualties. A five-variable set of content-referenced performance measures was derived from task analyses of the procedurally correct responses to the four casualties. System parameters and control manipulations were recorded by the computer controlling the simulator. Data on communications and procedure use were obtained from analysis of videotapes of the exercises. Questionnaires were used to collect subject biographical information and data on subjective workload during each simulated casualty. For four of the five performance measures, no significant differences were found between groups led by high (25 to 114 months) and low (1 to 17 months as an SRO) experience SROs. However, crews led by low experience SROs tended to have significantly shorter task performance times than crews led by high experience SROs. The presence of the STA had no significant effect on overall team performance in responding to the four simulated casualties. The FY84 experiments are a partial replication and extension of the FY83 experiment, but with PWR operators and simulator

  2. Summary of operating experience at Swedish nuclear power plants in 1984

    International Nuclear Information System (INIS)

    1985-01-01

    The four owners on nuclear power plants in Sweden - The Swedish State Power Board, Forsmarks Kraftgrupp AB, Sydkraft AB and OKG AKTIEBOLAG - formed in 1980 the Nuclear Safety Board of the Swedish Utilities as a joint body for collaboration in safety matters. The Board participates in coordination of the safety work of the utilities and conducts its own safety projects, whereever this is more efficient than the utilities' working independently. The work of the Board shall contribute to optimizing safety in the operation of the Swedish nuclear power plants. The most important function of the Board is to collect, process and evaluate information on operational disturbances and incidents at Swedish and foreign nuclear power plants and then use the knowledge thus gained to improve the safety of the operation of the Swedish nuclear power plants (experience feedback). The work with Experience Feedback proceeds in three stages: Event follow-up, Fault analysis and Feedback of results. The Board runs a system for experience feedback (ERF). ERF is a computer-based information and communication system. ERF provides the Board with a daily update of operating experience in both Swedish and foreign nuclear power plants. Each Swedish nuclear power station supplies the ERF system with data on, among other things, operation and operational distrubances. Important experiences are thereby fed back to plant operation. Experience from foreign nuclear power stations can be of interest to the Swedish nuclear power plants. This information comes to RKS and is reviewed daily. The information that is considered relevant to Swedish plants is fed after analysis into the ERF system. Conversely, foreign nuclear power stations can obtain information from the operation of the Swedish plants. (author)

  3. Best practices in the utilization and dissemination of operating experience at nuclear power plants

    International Nuclear Information System (INIS)

    2008-03-01

    IAEA Safety Standards Series No. SF-1 entitled Fundamental Safety Principles: Safety Fundamentals states the need for operating organizations to establish a programme for the collection and analysis of operating experience in nuclear power plants. Such a programme ensures that operating experience is analysed, events important to safety are reviewed in depth, lessons learned are disseminated to the staff of the organization and to relevant national and international organizations, operating experience is utilized and corrective actions are effectively implemented. This publication has been developed to provide advice and assistance to nuclear installations and related institutions, including contractors and support organizations, to strengthen and enhance their own feedback process through the implementation of best practices in the utilization and dissemination of operating experience and to assess their effectiveness. Dissemination and utilization of internal and external operating experience is essential in supporting a proactive safety management approach of preventing events from occurring. Few new events reveal a completely new cause or failure mechanism. Although not recognized prior to the event, most subsequent investigations identify internal or external industry operating experience that, if applied effectively, would have prevented the event. Therefore, the establishment of an effective utilization and dissemination process is very beneficial in raising awareness of the organization and individuals of available operating experience, and focussing effort in the implementation of the lessons learnt. This leads to improved safety and reliability. The present publication is the outcome of a coordinated effort involving the participation of experts of nuclear organizations in several Member States. It was written to complement the publication IAEA Services Series No. 10 entitled PROSPER Guidelines - Guidelines for Peer Review and for Plant Self-assessment of

  4. Experiments on the Impact of language Problems in the Multi-cultural Operation of NPPs' Emergency Operation

    International Nuclear Information System (INIS)

    Kang, Seongkeun; Kim, Taehoon; Seong, Poong Hyun; Ha, Jun Su

    2016-01-01

    In 2010, The Korea Electric Power Corporation (KEPCO) was awarded a multi-billion dollar bid to construct the first nuclear power plant in Barakah, UAE. One must keep in mind however, that with technology transfer and international cooperation comes a host of potential problems arising from cultural differences such as language, everyday habitudes and workplace expectation. As of now, how problematic these potential issues may become is unknown. Of the aforementioned factors, communication is perhaps of foremost importance. We investigated UAE culture-related issues through analysis of operating experience reviews (OERs) and came to the conclusion that the language barrier needed utmost attention. Korean nuclear power plant operators will work in UAE and will operate the NPPs with operators and managers of other nationalities as well. The purpose of this paper is firstly to confirm that operators are put under mental stress, and secondly to demonstrate the decline in accuracy when they must work in English. Reducing human error is quite important to make nuclear power plants safer. As the mental workload of human operator is increased, the probability of a human error occurring also increases. It will have a negative influence on the plant’s safety. There are many factors which can potentially increase mental workload. We focused on communication problem which is a key factor of increasing mental workload because many Korean operators will work in UAE nuclear power plants and may work together with UAE operators. From these experiments we compared how performance of both Korean and UAE subjects were decreased when they use English. We designed experimental methods to be able to check this problem qualitatively and quantitatively. We analyzed four factors to find the communication problems from the experiments which are accuracy, efficiency, NASA-TLX, and brain wave. Accuracy, efficiency, brain wave are quantitative factors, and NASA-TLX is qualitative factor. To

  5. GNF2 Operating Experience

    International Nuclear Information System (INIS)

    Schardt, John

    2007-01-01

    GNF's latest generation fuel product, GNF2, is designed to deliver improved nuclear efficiency, higher bundle and cycle energy capability, and more operational flexibility. But along with high performance, our customers face a growing need for absolute fuel reliability. This is driven by a general sense in the industry that LWR fuel reliability has plateaued. Too many plants are operating with fuel leakers, and the impact on plant operations and operator focus is unacceptable. The industry has responded by implementing an INPO-coordinated program aimed at achieving leaker-free reliability by 2010. One focus area of the program is the relationship between fuel performance (i.e., duty) and reliability. The industry recognizes that the right balance between performance and problem-free fuel reliability is critical. In the development of GNF2, GNF understood the requirement for a balanced solution and utilized a product development and introduction strategy that specifically addressed reliability: evolutionary design features supported by an extensive experience base; thoroughly tested components; and defense-in-depth mitigation of all identified failure mechanisms. The final proof test that the balance has been achieved is the application of the design, initially through lead use assemblies (LUAs), in a variety of plants that reflect the diversity of the BWR fleet. Regular detailed surveillance of these bundles provides the verification that the proper balance between performance and reliability has been achieved. GNF currently has GNF2 lead use assemblies operating in five plants. Included are plants that have implemented extended power up-rates, plants on one and two-year operating cycles, and plants with and without NobleChem TM and zinc injection. The leading plant has undergone three pool-side inspections outages to date. This paper reviews the actions taken to insure GNF2's reliability, and the lead use assembly surveillance data accumulated to date to validate

  6. Evaluation of operating experience for early recognition of deteriorating safety performance

    International Nuclear Information System (INIS)

    Beckmerhagen, I.A.; Berg, H.P.

    2004-01-01

    One of the most difficult challenges facing nuclear power plants is to recognize the early signs of degrading safety performance before regulatory requirements are imposed or serious incidents or accidents occur. Today, the nuclear industry is striving for collecting more information on occurrences that could improve the operational safety performance. To achieve this, the reporting threshold has been lowered from incidents to anomalies with minor or no impact to safety. Industry experience (also outside nuclear industry) has shown that these are typical issues which should be considered when looking for such early warning signs. Therefore, it is important that nuclear power plant operators have the capability to trend, analyse and recognize early warning signs of deteriorating performance. It is necessary that plant operators are sensitive to these warning signs which may not be immediately evident. Reviewing operating experience is one of the main tasks for plant operators in their daily activities. Therefore, self assessment should be at the centre of any operational safety performance programme. One way of applying a self assessment program is through the following four basic elements: operational data, events, safety basis, and related experience. This approach will be described in the paper in more details. (authors)

  7. CANDU operating experience

    International Nuclear Information System (INIS)

    McConnell, L.G.; Woodhead, L.W.; Fanjoy, G.R.

    1982-03-01

    The CANDU Pressurized Heavy Water (CANDU-PHW) type of nuclear electric generating station has been developed jointly by Atomic Energy of Canada Limited and Ontario Hydro. This paper highlights Ontario Hydro's operating experience using the CANDU-PHW system, with a focus on the operating performance and costs, reliability of system components and nuclear safety considerations both to the workers and the public

  8. IAEA Operational Safety Team Reviews Cattenom Nuclear Power Plant

    International Nuclear Information System (INIS)

    2011-01-01

    Full text: An international team of nuclear installation safety experts led by the International Atomic Energy Agency (IAEA) has reviewed operational safety at France's Cattenom Nuclear Power Plant (NPP) noting a series of good practices as well as recommendations and suggestions to reinforce them. The IAEA assembled an international team of experts at the request of the Government of France to conduct an Operational Safety Review (OSART) of Cattenom NPP. Under the leadership of the IAEA's Division of Nuclear Installation Safety in Vienna, the OSART team performed an in-depth operational safety review of the plant from 14 November to 1 December 2011. The team was made up of experts from Belgium, the Czech Republic, Finland, Germany, Hungary, Japan, Russia, Slovakia, South Africa, Sweden, Ukraine, the United Kingdom and the IAEA. The team at Cattenom conducted an in-depth review of the aspects essential to the safe operation of the NPP, which is largely under the control of the site management. The conclusions of the review are based on the IAEA's Safety Standards. The review covered the areas of Management, Organization and Administration; Training and Qualification; Operations; Maintenance; Technical Support; Operating Experience; Radiation Protection; Chemistry; Emergency Planning and Preparedness; and Severe Accident Management. Cattenom is the first plant in Europe to voluntarily undertake a Severe Accident Management review during an OSART review. The OSART team has identified good plant practices, which will be shared with the rest of the nuclear industry for consideration of their application. Examples include: Sheets are displayed in storage areas where combustible material is present - these sheets are updated readily and accurately by the area owner to ensure that the fire limits are complied with; A simple container is attached to the neutron source handling device to ensure ease and safety of operations and reduce possible radiation exposure during use

  9. European clearinghouse on nuclear power plants operational experience feedback

    International Nuclear Information System (INIS)

    Ranguelova, Vesselina; Bruynooghe, Christiane; Noel, Marc

    2010-01-01

    Learning from operational experience and applying this knowledge promptly and intelligently is one of the ways to improve the safety of Nuclear Power Plant (NPP). Recent reviews of the effectiveness of Operational Experience Feedback (OEF) systems have pointed to the need for further improvement, with importance being placed on tailoring the information to the needs of the regulators. In 2007, at the request of a number of nuclear safety regulatory authorities in Europe, the Institute for Energy of the European Commission's Joint Research Centre (EC JRC) initiated a project on Nuclear Power Plant operational experience feedback, which adopts an integrated approach to the research needed to strengthen the European capabilities for assessment of NPP operational events and to promote the development of tools and mechanisms for the improved application of the lessons learned. Consequently, a so-called ''European Clearinghouse'' on NPP OEF was established, which includes scientific officers from the EC JRC, a number of European nuclear safety regulatory authorities and some of their Technical Support Organizations (TSOs). The paper discusses the activities implemented in 2008 within the framework of the European Clearinghouse on NPP OEF (hereinafter called the European NPP Clearinghouse) and provides an overview of the main conclusions drawn from the safety studies performed. Outlook of the activities carried out in 2009 are given. (orig.)

  10. Operating Experience Report: Counterfeit, Suspect and Fraudulent Items. Working Group on Operating Experience. Proceedings and Analysis on an Item of Generic Interest

    International Nuclear Information System (INIS)

    2011-01-01

    recent information and to utilise the international group of experts to gather information to enhance their national efforts. In order to gain a better understanding of the situation in WGOE member country regarding this matter, a questionnaire was developed by the United States delegate together with the NRC (USA Regulatory body) lead for CSFI. This questionnaire was forwarded to the WGOE members in August of 2010. At the September 2010 WGOE meeting, the US delegate provided an introductory CSFI presentation. This presentation was followed by two other CSFI presentations. The acronym CSFI (Counterfeit, Suspect, and Fraudulent Items) and CFSI (Counterfeit, Fraudulent, Suspect Items) are interchangeable in meaning. However, the order has changed in some countries as the issue has evolved. The report provides the proceedings from the WGOE meeting discussion on the item of generic interest from September 2010. Additionally, this report aims to analyse the WGOE member country responses to the CSFI questionnaire and develop conclusions and recommendations on this generic issue. Its scope covers the compilation and review of the information provided in the meeting and by the WGOE members. It intends to be a starting point to deal with CFSI in the international operating experience arena

  11. Pipeline system operability review

    Energy Technology Data Exchange (ETDEWEB)

    Eriksson, Kjell [Det Norske Veritas (Norway); Davies, Ray [CC Technologies, Dublin, OH (United States)

    2005-07-01

    Pipeline operators are continuously working to improve the safety of their systems and operations. In the US both liquid and gas pipeline operators have worked with the regulators over many years to develop more systematic approaches to pipeline integrity management. To successfully manage pipeline integrity, vast amounts of data from different sources needs to be collected, overlaid and analyzed in order to assess the current condition and predict future degradation. The efforts undertaken by the operators has had a significant impact on pipeline safety, nevertheless, during recent years we have seen a number of major high profile accidents. One can therefore ask how effective the pipeline integrity management systems and processes are. This paper will present one methodology 'The Pipeline System Operability Review' that can evaluate and rate the effectiveness of both the management systems and procedures, as well as the technical condition of the hardware. The result from the review can be used to compare the performance of different pipelines within one operating company, as well as benchmark with international best practices. (author)

  12. Pipeline system operability review

    Energy Technology Data Exchange (ETDEWEB)

    Eriksson, Kjell [Det Norske Veritas (Norway); Davies, Ray [CC Technologies, Dublin, OH (United States)

    2005-07-01

    Pipeline operators are continuously working to improve the safety of their systems and operations. In the US both liquid and gas pipeline operators have worked with the regulators over many years to develop more systematic approaches to pipeline integrity management. To successfully manage pipeline integrity, vast amounts of data from different sources needs to be collected, overlaid and analyzed in order to assess the current condition and predict future degradation. The efforts undertaken by the operators has had a significant impact on pipeline safety, nevertheless, during recent years we have seen a number of major high profile accidents. One can therefore ask how effective the pipeline integrity management systems and processes are. This paper will present one methodology 'The Pipeline System Operability Review' that can evaluate and rate the effectiveness of both the management systems and procedures, as well as the technical condition of the hardware. The result from the review can be used to compare the performance of different pipelines within one operating company, as well as benchmark with international best practices. (author)

  13. Combining risk analysis and operating experience

    International Nuclear Information System (INIS)

    1986-10-01

    In recent years there has been an increasing interest in the systematic utilization of operating experience in the decision making process concerning large industrial facilities. Even before the advent of Probabilistic Safety Assessment (PSA), operating experience had always played an important role in such decisions. Of course, operating experience has always been an input to PSA also; however, as PSA becomes more mature and the quality and quantity of operating experience improve, greater emphasis is now being placed on the use of operating experience to update and validate PSA and thereby provide a more rational basis for decision making. This report outlines the ways in which data are collected, processed using mathematical techniques and utilized in decision making. It is not intended to provide details of the methods and procedures to be used in these areas, but is rather intended as an introduction to these topics and some of the relevant literature. The meeting presentations were divided into three sessions devoted to the following topics: evaluation of nuclear power plants operational experience (5 papers); uncertainties (2 papers); probabilistic safety assessment studies in Member States (7 papers). A separate abstract was prepared for each of these papers

  14. Experiments on the Impact of language Problems in the Multi-cultural Operation of NPPs' Emergency Operation

    Energy Technology Data Exchange (ETDEWEB)

    Kang, Seongkeun; Kim, Taehoon; Seong, Poong Hyun [KAIST, Daejeon (Korea, Republic of); Ha, Jun Su [KUSTAR, Abu Dhabi (United Arab Emirates)

    2016-10-15

    In 2010, The Korea Electric Power Corporation (KEPCO) was awarded a multi-billion dollar bid to construct the first nuclear power plant in Barakah, UAE. One must keep in mind however, that with technology transfer and international cooperation comes a host of potential problems arising from cultural differences such as language, everyday habitudes and workplace expectation. As of now, how problematic these potential issues may become is unknown. Of the aforementioned factors, communication is perhaps of foremost importance. We investigated UAE culture-related issues through analysis of operating experience reviews (OERs) and came to the conclusion that the language barrier needed utmost attention. Korean nuclear power plant operators will work in UAE and will operate the NPPs with operators and managers of other nationalities as well. The purpose of this paper is firstly to confirm that operators are put under mental stress, and secondly to demonstrate the decline in accuracy when they must work in English. Reducing human error is quite important to make nuclear power plants safer. As the mental workload of human operator is increased, the probability of a human error occurring also increases. It will have a negative influence on the plant’s safety. There are many factors which can potentially increase mental workload. We focused on communication problem which is a key factor of increasing mental workload because many Korean operators will work in UAE nuclear power plants and may work together with UAE operators. From these experiments we compared how performance of both Korean and UAE subjects were decreased when they use English. We designed experimental methods to be able to check this problem qualitatively and quantitatively. We analyzed four factors to find the communication problems from the experiments which are accuracy, efficiency, NASA-TLX, and brain wave. Accuracy, efficiency, brain wave are quantitative factors, and NASA-TLX is qualitative factor. To

  15. Operating experience: safety perspective

    International Nuclear Information System (INIS)

    Piplani, Vivek; Krishnamurthy, P.R.; Kumar, Neeraj; Upadhyay, Devendra

    2015-01-01

    Operating Experience (OE) provides valuable information for improving NPP safety. This may include events, precursors, deviations, deficiencies, problems, new insights to safety, good practices, lessons and corrective actions. As per INSAG-10, an OE program caters as a fundamental means for enhancing the defence-in-depth at NPPs and hence should be viewed as ‘Continuous Safety Performance Improvement Tool’. The ‘Convention on Nuclear Safety’ also recognizes the OE as a tool of high importance for enhancing the NPP safety and its Article 19 mandates each contracting party to establish an effective OE program at operating NPPs. The lessons drawn from major accidents at Three Mile Island, Chernobyl and Fukushima Daiichi NPPs had prompted nuclear stalwarts to change their safety perspective towards NPPs and to frame sound policies on issues like safety culture, severe accident prevention and mitigation. An effective OE program, besides correcting current/potential problems, help in proactively improving the NPP design, operating and maintenance procedures, practices, training, etc., and thus plays vital role in ensuring safe and efficient operation of NPPs. Further it enhances knowledge with regard to equipment operating characteristics, system performance trends and provides data for quantitative and qualitative safety analysis. Besides all above, an OE program inculcates a learning culture in the organisation and thus helps in continuously enhancing the expertise, technical competency and knowledge base of its staff. Nuclear and Radiation Facilities in India are regulated by Atomic Energy Regulatory Board (AERB). Operating Plants Safety Division (OPSD) of AERB is involved in managing operating experience activities. This paper provides insights about the operating experience program of OPSD, AERB (including its on-line data base namely OPSD STAR) and its utilisation in improving the regulations and safety at Indian NPPs/projects. (author)

  16. An operating nuclear utility's experience with the ALARA design of a new nuclear unit

    International Nuclear Information System (INIS)

    Rodgers, R.C.

    1985-01-01

    This talk presents a review of how operating experience at Northeast Utilities has been factored into the design of a new nuclear unit and the development and management of the radiation protection program. Their operational experience has indicated that there are two facets to keeping radiation exposures ALARA. The first is the proper ALARA design of the unit. The other facet is the design of a comprehensive radiation protection program. The author discusses these facets in some detail

  17. Operating Experiences of a Loss of Voltage Monitoring Program

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Eun-Chan [Korea Hydro and Nuclear Power Co. Ltd., Daejeon (Korea, Republic of)

    2015-10-15

    Loss of voltage (LOV) events continue to occur due to inadequate work management and random human errors. On February 26, 2015, regulators analyzed the root causes of LOV events and presented the results for the nuclear industry. Currently, KHNP uses a risk monitoring program, which is named 'LOV Monitor', for LOV prevention during pilot plant outages. This review introduces the operation experiences of LOV Monitor based on the evaluation results of a real event. The operation experiences of LOV Monitor in the pilot plants confirmed that this program could detect and reduce LOV possibilities from scheduling errors such as the simultaneous maintenance of energized trains and de-energized trains considering the physical conditions of the power circuit breakers. However, a maintenance culture that heeds the risk monitoring result must be strengthened in order to obtain substantial effects through applying LOV Monitor to the outage.

  18. Operational experience feedback with precursor analysis

    International Nuclear Information System (INIS)

    Koncar, M.; Ferjancic, M.; Muehleisen, A.; Vojnovic, D.

    2003-01-01

    Experience of practical operation is a valuable source of information for improving the safety and reliability of nuclear power plants. Operational experience feedback (Olef) system manages this aspect of NPP operation. The traditional ways of investigating operational events, such as the root cause analysis (RCA), are predominantly qualitative. RCA as a part of the Olef system provides technical guidance and management expectations in the conduct of assessing the root cause to prevent recurrence, covering the following areas: conditions preceding the event, sequence of events, equipment performance and system response, human performance considerations, equipment failures, precursors to the event, plant response and follow-up, radiological considerations, regulatory process considerations and safety significance. The root cause of event is recognized when there is no known answer on question 'why has it happened?' regarding relevant condition that may have affected the event. At that point the Olef is proceeding by actions taken in response to events, utilization, dissemination and exchange of operating experience information and at the end reviewing the effectiveness of the Olef. Analysis of the event and the selection of recommended corrective/preventive actions for implementation and prioritization can be enhanced by taking into account the information and insights derived from Pasa-based analysis. A Pasa based method, called probabilistic precursor event analysis (PPE A) provides a complement to the RCA approach by focusing on how an event might have developed adversely, and implies the mapping of an operational event on a probabilistic risk model of the plant in order to obtain a quantitative assessment of the safety significance of the event PSA based event analysis provides, due to its quantitative nature, appropriate prioritization of corrective actions. PPEA defines requirements for PSA model and code, identifies input requirements and elaborates following

  19. Operational safety review programmes for nuclear power plants. Guidelines for assessment

    International Nuclear Information System (INIS)

    2002-01-01

    The IAEA has been offering the Operational Safety Review Team (OSART) programme to provide advice and assistance to Member States in enhancing the operational safety of nuclear power plants (NPPs). Simultaneously, the IAEA has encouraged self-assessment and review by Member States of their own nuclear power plants to continuously improve nuclear safety. Currently, some utilities have been implementing safety review programmes to independently review their own plants. Corporate or national operational safety review programmes may be compliance or performance based. Successful utilities have found that both techniques are necessary to provide assurance that (i) as a minimum the NPP meets specific corporate and legal requirements and (ii) management at the NPP is encouraged to pursue continuous improvement principles. These programmes can bring nuclear safety benefits to the plants and utilities. The IAEA has conducted two pilot missions to assess the effectiveness of the operational review programme. Based on these missions and on the experience gained during OSART missions, this document has been developed to provide guidance on and broaden national/corporate safety review programmes in Member States, and to assist in maximizing their benefits. These guidelines are intended primarily for the IAEA team to conduct assessment of a national/corporate safety review programme. However, this report may also be used by a country or utility to establish its own national/corporate safety review programme. The guidelines may likewise be used for self-assessment or for establishing a baseline when benchmarking other safety review programmes. This report consists of four parts. Section 2 addresses the planning and preparation of an IAEA assessment mission and Sections 3 and 4 deal with specific guidelines for conducting the assessment mission itself

  20. Operating experience feedback report -- turbine-generator overspeed protection systems: Commercial power reactors. Volume 11

    International Nuclear Information System (INIS)

    Ornstein, H.L.

    1995-04-01

    This report presents the results of the US Nuclear Regulatory Commission's Office for Analysis and Evaluation of Operational Data (AEOD) review of operating experience of main turbine-generator overspeed and overspeed protection systems. It includes an indepth examination of the turbine overspeed event which occurred on November 9, 1991, at the Salem Unit 2 Nuclear Power Plant. It also provides information concerning actions taken by other utilities and the turbine manufacturers as a result of the Salem overspeed event. AEOD's study reviewed operating procedures and plant practices. It noted differences between turbine manufacturer designs and recommendations for operations, maintenance, and testing, and also identified significant variations in the manner that individual plants maintain and test their turbine overspeed protection systems. AEOD's study provides insight into the shortcomings in the design, operation, maintenance, testing, and human factors associated with turbine overspeed protection systems. Operating experience indicates that the frequency of turbine overspeed events is higher than previously thought and that the bases for demonstrating compliance with NRC's General Design Criterion (GDC) 4, Environmental and dynamic effects design bases, may be nonconservative with respect to the assumed frequency

  1. Operating experience

    International Nuclear Information System (INIS)

    McRae, L.P.; Six, D.E.

    1991-01-01

    In 1987, Westinghouse Hanford Company began operating a first-generation integrated safeguards system in the Plutonium Finishing Plant storage vaults. This Vault Safety and Inventory System is designed to integrate data into a computer-based nuclear material inventory monitoring system. The system gathers, in real time, measured physical parameters that generate nuclear material inventory status data for thousands of stored items and sends tailored report to the appropriate users. These data include canister temperature an bulge data reported to Plant Operations and Material Control and Accountability personnel, item presence and identification data reported to Material Control and Accountability personnel, and unauthorized item movement data reported to Security response forces and Material Control and Accountability personnel. The Westinghouse Hanford Company's experience and operational benefits in using this system for reduce radiation exposure, increase protection against insider threat, and real-time inventory control are discussed in this paper

  2. Small sodium valve design and operating experience

    International Nuclear Information System (INIS)

    McGough, C.B.

    1974-01-01

    The United States Liquid Metal Fast Breeder Reactor program (LMFBR) includes an extensive program devoted to the development of small sodium valves. This program is now focused on the development and production of valves for the Fast Flux Test Facility (FFTF) now under construction near Richland, Washington. Other AEC support facilities, such as various test loops located at the Liquid Metal Engineering Center (LMEC), Los Angeles, California, and at the Hanford Engineering Development Laboratory (HEDL), Richland, Washington, also have significant requirements for small sodium valves, and valves similar in design to the FFTF valves are being supplied to these AEC laboratories for use in their critical test installations. A principal motivation for these valve programs, beyond the immediate need to provide high-reliability valves for FFTF and the support facilities, is the necessity to develop small valve technology for the Clinch River Breeder Reactor Plant (CRBRP). FFTF small sodium valve design and development experience will be directly applied to the CRBRP program. Various test programs have been, and are being, conducted to verify the performance and integrity of the FFTF valves, and to uncover any potential problems so that they can be corrected before the valves are placed in service in FFTF. The principal small sodium valve designs being utilized in current U.S. programs, the test and operational experience obtained to date on them, problems uncovered, and future development and testing efforts being planned are reviewed. The standards and requirements to which the valves are being designed and fabricated, the valve designs in current use, valve operators, test and operating experience, and future valve development plans are summarized. (U.S.)

  3. 14 CFR 121.434 - Operating experience, operating cycles, and consolidation of knowledge and skills.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Operating experience, operating cycles, and... Qualifications § 121.434 Operating experience, operating cycles, and consolidation of knowledge and skills. (a... position, the operating experience, operating cycles, and the line operating flight time for consolidation...

  4. Quality assurance of pre-operative assessment--a review of quality assurance activities related to pre-operative assessment in nine hospitals in The Netherlands

    NARCIS (Netherlands)

    Klazinga, N. S.; Helsloot, R.

    1989-01-01

    Pre-operative assessment of patients for surgery is one of the most prevalent topics for quality assurance by peer-review in Dutch hospitals. This article describes the experiences with pre-operative assessment in nine hospitals. It is discussed why preoperative assessment is performed, what tests

  5. Best practices in identifying, reporting and screening operating experience at nuclear power plants

    International Nuclear Information System (INIS)

    2008-03-01

    IAEA Safety Standards Series No. SF-1 entitled Fundamental Safety Principles: Safety Fundamentals states the need for operating organizations to establish a programme for the collection and analysis of operating experience in nuclear power plants. Such a programme ensures that operating experience is analysed, events important to safety are reviewed in depth, lessons learned are disseminated to the staff of the organization and to relevant national and international organizations, and corrective actions are effectively implemented. This publication has been developed to provide advice and assistance to nuclear installations, and related institutions including contractors and support organizations to strengthen and enhance their own feedback process through the implementation of best practices in identifying, reporting and screening processes and to assess the effectiveness of the above areas. To support a proactive safety management approach the nuclear installations are enhancing the operating experience feedback (OEF) processes. For this purpose, the nuclear industry is striving to collect more information on occurrences that are useful to address the early signs of declining performance and improve operational safety performance. In this environment a strong reporting culture that motivates people to identify and report issues is an important attribute. As a consequence, the number and diversity of issues identified increases, and there is a need to set thresholds of screening for further treatment. Thus, the establishment of an effective identification, reporting and screening process is very beneficial to streamline the efforts, and ensure that major incidents and latent weaknesses are being addressed and that operating experience is treated according to its significance. This leads to improved safety and production. This publication was written to complement the publication IAEA Services Series No. 10 - PROSPER Guidelines - Guidelines for Peer Review and for

  6. The relationship of previous training and experience of journal peer reviewers to subsequent review quality.

    Directory of Open Access Journals (Sweden)

    Michael L Callaham

    2007-01-01

    Full Text Available BACKGROUND: Peer review is considered crucial to the selection and publication of quality science, but very little is known about the previous experiences and training that might identify high-quality peer reviewers. The reviewer selection processes of most journals, and thus the qualifications of their reviewers, are ill defined. More objective selection of peer reviewers might improve the journal peer review process and thus the quality of published science. METHODS AND FINDINGS: 306 experienced reviewers (71% of all those associated with a specialty journal completed a survey of past training and experiences postulated to improve peer review skills. Reviewers performed 2,856 reviews of 1,484 separate manuscripts during a four-year study period, all prospectively rated on a standardized quality scale by editors. Multivariable analysis revealed that most variables, including academic rank, formal training in critical appraisal or statistics, or status as principal investigator of a grant, failed to predict performance of higher-quality reviews. The only significant predictors of quality were working in a university-operated hospital versus other teaching environment and relative youth (under ten years of experience after finishing training. Being on an editorial board and doing formal grant (study section review were each predictors for only one of our two comparisons. However, the predictive power of all variables was weak. CONCLUSIONS: Our study confirms that there are no easily identifiable types of formal training or experience that predict reviewer performance. Skill in scientific peer review may be as ill defined and hard to impart as is "common sense." Without a better understanding of those skills, it seems unlikely journals and editors will be successful in systematically improving their selection of reviewers. This inability to predict performance makes it imperative that all but the smallest journals implement routine review ratings

  7. IAEA Operational Safety Team Reviews Saint-Alban Nuclear Power Plant, France

    International Nuclear Information System (INIS)

    2010-01-01

    Full text: An international team of nuclear installation safety experts, led by the International Atomic Energy Agency (IAEA), has reviewed safety practices at France's Saint-Alban Nuclear Power Plant (NPP) and has highlighted a set of strong practices as well as a series of recommendations to reinforce them. The IAEA assembled the team at the request of the Government of France to conduct an Operational Safety Review (OSART) of the Saint-Alban NPP. Under the leadership of the IAEA's Division of Nuclear Installation Safety in Vienna, the OSART team performed an in-depth operational safety review from 20 September to 6 October 2010. The team was made up of experts from Belgium, Canada, the Czech Republic, Germany, Lithuania, the Netherlands, Slovakia, Sweden and the USA. An OSART mission is designed to review programmes and activities essential to operational safety. It is not a regulatory inspection, nor is it a design review or a substitute for an exhaustive assessment of the plant's overall safety status. The team at Saint-Alban conducted an in-depth review of the aspects essential to the safe operation of the NPP, which largely are under the control of the site management. The conclusions of the review are based on the IAEA's Safety Standards and proven good international practices. The review covered the areas of Management, Organization and Administration; Training and Qualification; Operations; Maintenance; Technical Support; Operating Experience; Radiation Protection; Chemistry; and Emergency Planning and Preparedness. The OSART team has identified good plant practices, which will be shared with the rest of the nuclear industry for consideration of their application. Examples include: A safety guideline for outages; The use of remote video surveillance of fuel inspection and handling activities; A motivational tool for plant staff regarding the benefits of operating experience and associated corrective actions; and Use of a sophisticated key control system

  8. Review of irradiation experiments for water reactor safety research

    International Nuclear Information System (INIS)

    Tobioka, Toshiaki

    1977-02-01

    A review is made of irradiation experiments for water reactor safety research under way in both commercial power plants and test reactors. Such experiments are grouped in two; first, LWR fuel performance under normal and abnormal operating conditions, and second, irradiation effects on fracture toughness in LWR vessels. In the former are fuel densification, swelling, and the influence of power ramp and cycling on fuel rod, and also fuel rod behavior under accident conditions in in-reactor experiment. In the latter are the effects of neutron exposure level on the ferritic steel of pressure vessels, etc.. (auth.)

  9. ATLAS IBL operational experience

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00237659; The ATLAS collaboration

    2017-01-01

    The Insertable B-Layer (IBL) is the inner most pixel layer in the ATLAS experiment, which was installed at 3.3 cm radius from the beam axis in 2014 to improve the tracking performance. To cope with the high radiation and hit occupancy due to proximity to the interaction point, a new read-out chip and two different silicon sensor technologies (planar and 3D) have been developed for the IBL. After the long shut-down period over 2013 and 2014, the ATLAS experiment started data-taking in May 2015 for Run-2 of the Large Hadron Collider (LHC). The IBL has been operated successfully since the beginning of Run-2 and shows excellent performance with the low dead module fraction, high data-taking efficiency and improved tracking capability. The experience and challenges in the operation of the IBL is described as well as its performance.

  10. The safeguards on-site laboratory at Sellafield. Five years operational experience

    Energy Technology Data Exchange (ETDEWEB)

    Duinslaeger, L.; Belle, P. van; Mayer, K.; Casteleyn, K.; Abousahl, S.; Daures, P.; Eberle, H.; Enright, T.; Guiot, A.; Hild, M.; Horta Domenech, J.; Lajarge, P.; Laurent, P.; Le Terrier, A.; Lynch, B.; Marucci, M.; Millet, S.; Ottmar, H.; Richir, P.; Street, S.; Vallet, P.; Zuleger, E. [European Commission, Karlsruhe (Germany). Inst. for Transuranium Elements

    2004-06-01

    The start of operation of the large reprocessing facilities led Euratom Safeguards to a new approach for verification analysis of samples taken at the facility: the installation of on-site laboratories. The availability of analytical capabilities for independent verification measurements at the site of these facilities offers obvious advantages in view of timeliness of results. The 'On-Site Laboratory' (OSL) at the BNFL Sellafield site was the first ever and entered into operation in 1999. For almost five years, the Institute for Transuranium Elements (ITU) has been operating the laboratory under routine conditions. During this period, more than one thousand safeguards samples were analysed. The experience gained in the management, logistics and operation of the OSL allow a critical review based on a significant period in time. This includes also aspects of training of staff, maintenance of equipment, flow of information, and improvements in the efficiency. The analytical issues are of key importance: based on the operational experience, the measurement methods were adapted (changing boundary conditions), the distribution of samples according to material type changed (start up of MOS fabrication plant), and the cutback in resources triggered a further streamlining of the analytical efforts. (orig.)

  11. Operating experience review - Ventilation systems at Department of Energy Facilities

    Energy Technology Data Exchange (ETDEWEB)

    1994-05-01

    The Office of Special Projects (DP-35), formerly Office of Self-Assessment (DP-9), analyzed occurrences caused by problems with equipment and material and recommended the following systems for an in-depth study: (1) Selective Alpha Air Monitor (SAAM), (2) Emergency Diesel Generator, (3) Ventilation System, (4) Fire Alarm System. Further, DP-35 conducted an in-depth review of the problems associated with SAAM and with diesel generators, and made several recommendations. This study focusses on ventilation system. The intent was to determine the causes for the events related to these system that were reported in the Occurrence Reporting and Processing System (ORPS), to identify components that failed, and to provide technical information from the commercial and nuclear industries on the design, operation, maintenance, and surveillance related to the system and its components. From these data, sites can develop a comprehensive program of maintenance management, including surveillance, to avoid similar occurrences, and to be in compliance with the following DOE orders.

  12. Operating Experience with Power Reactors. Proceedings of the Conference on Operating Experience with Power Reactors. Vol. I

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1963-10-15

    At the beginning of 1963 nuclear power plants produced some 3 500 000kW of electrical power to different distribution grids around the world. Much significant operating experience has been gained with these power reactors, but this experience is often not collected in such a way as to make it easily available. The International Atomic Energy Agency convened a Conference on Operating Experience with Power Reactors in Vienna from 4-8 June 1963 which was attended by 240 participants representing 27 of the Agency's Member States and six international organizations. At the Conference, 42 papers giving detailed experience with more than 20 nuclear power stations were discussed. Although similar meetings on a national or regional scale have been held earlier in various countries, this is the first arranged by the Agency on a world-wide basis. Some of the detailed material may have been given earlier but for the most part it represents new and recently acquired experience, and for the first time it has been possible to compile in one place such extensive material on the operating experience with power reactors. The Conference discussed the experience gained both generally in the context of national and international nuclear power development programmes, and more specifically in the detailed operating experience with different power reactor stations. In addition, various plant components, fuel cycles, staffing of nuclear plants and licensing of such staff were treated. It is hoped that these Proceedings will be of interest not only to nuclear plant designers and operators who daily encounter problems similar to those discussed by the Conference, but also to those guiding the planning and implementation of power development programmes.

  13. Operating Experience with Power Reactors. Proceedings of the Conference on Operating Experience with Power Reactors. Vol. II

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1963-10-15

    At the beginning of 1963 nuclear power plants produced some 3 500 000 kW of electrical power to different distribution grids around the world. Much significant operating experience has been gained with these power reactors, but this experience is often not collected in such a way as to make it easily available. The International Atomic Energy Agency convened a Conference on Operating Experience with Power Reactors in Vienna from 4 -8 June 1963 which was attended by 240 participants representing 27 of the Agency's Member States and six international organizations. At the Conference, 42 papers giving detailed experience with more than 20 nuclear power stations were discussed. Although similar meetings on a national or regional scale have been held earlier in various countries, this is the first arranged by the Agency on a world-wide basis. Some of the detailed material may have been given earlier but for the most part it represents new and recently acquired experience, and for the first time it has been possible to compile in one place such extensive material on the operating experience with power reactors. The Conference discussed the experience gained both generally in the context of national and international nuclear power development programmes, and more specifically in the detailed operating experience with different power reactor stations. In addition, various plant components, fuel cycles, staffing of nuclear plants and licensing of such staff were treated. It is hoped that these Proceedings will be of interest not only to nuclear , plant designers and operators who daily encounter problems similar to those discussed by the Conference, but also to those guiding the planning and implementation of power development programmes.

  14. Regulatory challenges in using nuclear operating experience

    International Nuclear Information System (INIS)

    2006-01-01

    The fundamental objective of all nuclear safety regulatory bodies is to ensure that nuclear utilities operate their plants in an acceptably safe manner at all times. Learning from experience has been a key element in meeting this objective. It is therefore very important for nuclear power plant operators to have an active programme for collecting, analysing and acting on the lessons of operating experience that could affect the safety of their plants. NEA experts have noted that almost all of the recent, significant events reported at international meetings have occurred earlier in one form or another. Counteractions are usually well-known, but information does not always seem to reach end users, or corrective action programmes are not always rigorously applied. Thus, one of the challenges that needs to be met in order to maintain good operational safety performance is to ensure that operating experience is promptly reported to established reporting systems, preferably international in order to benefit from a larger base of experience, and that the lessons from operating experience are actually used to promote safety. This report focuses on how regulatory bodies can ensure that operating experience is used effectively to promote the safety of nuclear power plants. While directed at nuclear power plants, the principles in this report may apply to other nuclear facilities as well. (author)

  15. VVER operational experience - effect of preconditioning and primary water chemistry on radioactivity build-up

    International Nuclear Information System (INIS)

    Zmitko, M.; Kysela, J.; Dudjakova, K.; Martykan, M.; Janesik, J.; Hanus, V.; Marcinsky, P.

    2004-01-01

    The primary coolant technology approaches currently used in VVER units are reviewed and compared with those used in PWR units. Standard and modified water chemistries differing in boron-potassium control are discussed. Preparation of the VVER Primary Water Chemistry Guidelines in the Czech Republic is noted. Operational experience of some VVER units, operated in the Czech Republic and Slovakia, in the field of the primary water chemistry, and radioactivity transport and build-up are presented. In Mochovce and Temelin units, a surface preconditioning (passivation) procedure has been applied during hot functional tests. The main principles of the controlled primary water chemistry applied during the hot functional tests are reviewed and importance of the water chemistry, technological and other relevant parameters is stressed regarding to the quality of the passive layer formed on the primary system surfaces. The first operational experience obtained in the course of beginning of these units operation is presented mainly with respect to the corrosion products coolant and surface activities. Effect of the initial passivation performed during hot functional tests and the primary water chemistry on corrosion products radioactivity level and radiation situation is discussed. (author)

  16. First insights from common GRS and IRSN evaluations of operational experiences for the European Clearinghouse

    International Nuclear Information System (INIS)

    Maqua, M.; Bertrand, R.

    2012-01-01

    The European Clearinghouse on Operating Experience Feedback (OEF) for NPPs was established in 2008 by several European Nuclear Safety Regulators. The technical work on common operational experience evaluation was launched at the Joint Research Center of the European Union. Main goals of the European Clearinghouse include promotion of collaboration on OEF, dissemination of the lessons learnt from NPP operational experience and promoting advanced event assessment approaches and methods. The extended knowledge of both IRSN and GRS in the evaluation of the national operating experiences in France and Germany, respectively, is used by the European Clearinghouse with the objective of receiving detailed insights on safety related topics. IRSN and GRS develop common reports on safety issues upon request of the Clearinghouse that involve a detailed review of their national event databases, and that are combined afterwards in a European Clearinghouse report including also the review carried out by the JRC on the basis of the Incident Report System (IRS) database and the US NRC Licensee Event Reports (LERs) database. The aim is to perform in-depth analyses (causes, root causes, contributing factors, actual and potential consequences, and lessons learnt) of specific OEF topics. 3 topics have been already analyzed: -) external events (Serious accidents caused by external hazards were not found in the German and French operating experience), -) ageing of components (it can be concluded that ageing management in French and German NPP is basically effective), and -) component supply (the main cause for events related to the supply of components was insufficiency during manufacturing or testing). This paper is followed by the slides of the presentation

  17. The Wonderland of Operating the ALICE Experiment

    CERN Document Server

    Augustinus, A; Pinazza, O; Rosinský, P; Lechman, M; Jirdén, L; Chochula, P

    2011-01-01

    ALICE is one of the experiments at the Large Hadron Collider (LHC), CERN, Geneva, Switzerland. Composed of 18 sub-detectors each with numerous subsystems that need to be controlled and operated in a safe and efficient way. The Detector Control System (DCS) is the key to this and has been used by detector experts with success during the commissioning of the individual detectors. During the transition from commissioning to operation, more and more tasks were transferred from detector experts to central operators. By the end of the 2010 datataking campaign, the ALICE experiment was run by a small crew of central operators, with only a single controls operator. The transition from expert to non-expert operation constituted a real challenge in terms of tools, documentation and training. A relatively high turnover and diversity in the operator crew that is specific to the HEP experiment environment (as opposed to the more stable operation crews for accelerators) made this challenge even bigger. Thi...

  18. Operating experiences in fuel handling system at KGS

    International Nuclear Information System (INIS)

    Reddy, G.P.; Nagabhushanam

    2006-01-01

    Refuelling operations were started at KGS in August, 2000. Rich and varied experience was gained during this period through internal discussion/Quality circles/Procedural reviews and analysis of various incidents that have taken place in KGS and other units of NPCIL Some of the unique jobs carried out at KGS include-Development of tools for in-situ replacement of FM front end cover in FM service area (which was done for the first time in NPCIL history), Modification of FM magazine rear end plate mounting screws to avoid the possibility of magazine rotation stalling, The incident of Stalling of B-Ram during installation of upstream shield plug in KGS - 1 has brought out many weakness that were existing in the system in a dormant manner. Review of maintenance procedures was carried out and a special underwater operated sensor was developed and installed in Transfer Magazine to sense the presence and proper positioning of fuel bundles in the Transfer magazine tube during fuel loading operation. Numerous modifications were carried out in the system to increase equipment reliability, ease of operation and maintenance, to reduce man-rem consumption. Most notable among these modifications include -zig saw panel modification, EFCV O-ring modification, Ram BF switch modification, provision for increase in SFSB level provision, snout clamp oil circuit modification, ball valve actuator modification, installation of additional switch for sensing STS carriage UP position etc, This paper focuses on the challenges tackled in achieving near perfect performance, innovations and improvements carried out in the system to strive for this goal and development of procedures for reducing man-rem consumption and life extension of critical components. (author)

  19. The BGL coal gasification process - development status, operational experience and potential applications

    Energy Technology Data Exchange (ETDEWEB)

    Williams, A.R.; Brown, D.J.; H. Hirschfelder [Advantica Technologies Ltd., Loughborough (United Kingdom)

    2006-07-01

    The BGL gasifier's fixed bed mode of operation makes for significant operational differences to the various entrained flow bed gasification processes currently available, whilst the slagging lower half offers considerable advantages over older processes in terms of efficiency and steam usage. This paper reviews operating experience of the BGL process on a variety of feedstocks and presents economic and technical assessments of the application of the BGL gasifier for IGCC, Syngas and SNG applications under current market conditions. Finally there a survey of the status of new BGL gasification projects and the scope of the current BGL technology is offering. 2 figs., 3 tabs., 2 photos.

  20. Operating experience in reprocessing

    International Nuclear Information System (INIS)

    Schueller, W.

    1983-01-01

    Since 1953, reprocessing has accumulated 180 years of operating experience in ten plants, six of them with 41 years of operation in reprocessing oxide fuel from light water reactors. After abortive, premature attempts at what is called commercial reprocessing, which had been oriented towards the market value of recoverable uranium and plutonium, non-military reprocessing technologies have proved their technical feasibility, since 1966 on a pilot scale and since 1976 on an industrial scale. Reprocessing experience obtained on uranium metal fuel with low and medium burnups can now certainly be extrapolated to oxide fuel with high burnup and from pilot plants to industrial scale plants using the same technologies. The perspectives of waste management of the nuclear power plants operated in the Federal Republic of Germany should be viewed realistically. The technical problems still to be solved are in a balanced relationship to the benefit arising to the national economy out of nuclear power generation and can be solved in time, provided there are clearcut political boundary conditions. (orig.) [de

  1. Clinical Experience of Auditory Brainstem Response Testing on Pediatric Patients in the Operating Room

    Directory of Open Access Journals (Sweden)

    Guangwei Zhou

    2012-01-01

    Full Text Available Objectives. To review our experience of conducting auditory brainstem response (ABR test on children in the operating room and discuss the benefits versus limitations of this practice. Methods. Retrospective review study conducted in a pediatric tertiary care facility. A total of 267 patients identified with usable data, including ABR results, medical and surgical notes, and follow-up evaluation. Results. Hearing status successfully determined in all patients based on the ABR results form the operating room. The degrees and the types of hearing loss also documented in most of the cases. In addition, multiple factors that may affect the outcomes of ABR in the operating room identified. Conclusions. Hearing loss in children with complicated medical issues can be accurately evaluated via ABR testing in the operating room. Efforts should be made to eliminate adverse factors to ABR recording, and caution should be taken when interpreting ABR results from the operating room.

  2. Operational Readiness Review: Savannah River Replacement Tritium Facility

    International Nuclear Information System (INIS)

    1993-02-01

    The Operational Readiness Review (ORR) is one of several activities to be completed prior to introducing tritium into the Replacement Tritium Facility (RTF) at the Savannah River Site (SRS). The Secretary of Energy will rely in part on the results of this ORR in deciding whether the startup criteria for RTF have been met. The RTF is a new underground facility built to safely service the remaining nuclear weapons stockpile. At RTF, tritium will be unloaded from old components, purified and enriched, and loaded into new or reclaimed reservoirs. The RTF will replace an aging facility at SRS that has processed tritium for more than 35 years. RTF has completed construction and is undergoing facility startup testing. The final stages of this testing will require the introduction of limited amounts of tritium. The US Department of Energy (DOE) ORR was conducted January 19 to February 4, 1993, in accordance with an ORR review plan which was developed considering previous readiness reviews. The plan also considered the Defense Nuclear Facilities Safety Board (DNFSB) Recommendations 90-4 and 92-6, and the judgements of experienced senior experts. The review covered three major areas: (1) Plant and Equipment Readiness, (2) Personnel Readiness, and (3) Management Systems. The ORR Team was comprised of approximately 30 members consisting of a Team Leader, Senior Safety Experts, and Technical Experts. The ORR objectives and criteria were based on DOE Orders, industry standards, Institute of Nuclear Power Operations guidelines, recommendations of external oversight groups, and experience of the team members

  3. Kayenta advanced series compensation operational experience

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-01

    The world's first three-phase, thyristor-controlled series compensation scheme with continuously variable impedance has been introduced into a transmission system. Energized and dedicated in September 1992, the installation was placed into commercial operation in January 1993 and has provided over one year of operating experience. This paper describes the 230 kV, 330 MVAr (60 Hz) advanced series compensation (ASC) project, located in north-eastern Arizona at Kayenta Substation on the 320 km Glen Canyon-Shiprock transmission line. The paper describes operating experiences, coordination with phase shifting transformer, phase shifter failure, platform power, system disturbances, and future plans.

  4. TSTA Piping and Flame Arrestor Operating Experience Data

    Energy Technology Data Exchange (ETDEWEB)

    Cadwallader, Lee C.; Willms, R. Scott

    2014-10-01

    The Tritium Systems Test Assembly (TSTA) was a facility dedicated to tritium handling technology and experiment research at the Los Alamos National Laboratory. The facility operated from 1984 to 2001, running a prototype fusion fuel processing loop with ~100 grams of tritium as well as small experiments. There have been several operating experience reports written on this facility’s operation and maintenance experience. This paper describes analysis of two additional components from TSTA, small diameter gas piping that handled small amounts of tritium in a nitrogen carrier gas, and the flame arrestor used in this piping system. The operating experiences and the component failure rates for these components are discussed in this paper. Comparison data from other applications are also presented.

  5. Ontario Hydro CANDU operating experience

    International Nuclear Information System (INIS)

    Bartholomew, R.W.; Woodhead, L.W.; Horton, E.P.; Nichols, M.J.; Daly, I.N.

    1987-01-01

    The CANDU Pressurized Heavy Water (CANDU-PHW) type of nuclear-electric generating station has been developed jointly by Atomic Energy of Canada Limited and Ontario Hydro. This report highlights Ontario Hydro's operating experience using the CANDU-PHW system, with a focus on worker and public safety, operating performance and costs, and reliability of system components

  6. Feedback of operation and maintenance experience into evolutionary plant design (HWRs)

    International Nuclear Information System (INIS)

    Hedges, K.R.; Sanatkumar, A.; Kwon, Oh-Cheol

    1999-01-01

    The process of feeding back operation and maintenance information into the CANDU plant design process has been in constant evolution since the beginning of the CANDU program. The commissioning and operation experience from the first commercial reactors at Pickering A and Bruce A was used extensively in the design of the first generation CANDU 6 Plants. These units have been in operation for 15 years, producing electricity at an average lifetime capacity factor of about 85%. In further advancing the CANDU 6 and 9 design, greater emphasis is placed on enhancements that can reduce operational costs and further improve plant performance by reducing the planned outage time. The plant design has been improved to facilitate maintenance scheduling, equipment isolation, maintenance and post maintenance testing. Individual tasks have been analyzed as well as the interaction between tasks during outages to reduce the down time required and simplify the execution of the work. This results in shorter outages, reduced radioactive dose and reduced costs. The Utilities have continued to play an important role in CANDU 6 Evolution. Specifically; the Korea Utility KEPCO has one of the original four CANDU 6 Plants and three of the most modem. Their feedback to the designers has been very helpful. One of the most important feedback processes is through the CANDU Owners Group, which provides information exchange between members. In India eight PHWRs of 220 MWe capacity are in operation. Four reactors, also of 220 MWe capacity are in advanced stages of construction. Site construction work of two units of 500 MWe PHWRs at Tarapur will be taken up shortly. Over the years, during construction and operation of these power stations, a large amount of experience has been accumulated. Operation and maintenance experience is shared with operating stations by intensive participation of design engineers in Station Operation Review meetings, trouble shooting and root cause analysis of problems

  7. A systematic review of peri-operative melatonin

    DEFF Research Database (Denmark)

    Andersen, L P H; Werner, M U; Rosenberg, J

    2014-01-01

    We systematically reviewed randomised controlled trials of peri-operative melatonin. We included 24 studies of 1794 participants that reported eight peri-operative outcomes: anxiety; analgesia; sleep quality; oxidative stress; emergence behaviour; anaesthetic requirements; steal induction......%, respectively. Qualitative reviews suggested the melatonin improved sleep quality and emergence behaviour, and might be capable of reducing oxidative stress and anaesthetic requirements....

  8. Operational experience with superconducting synchrotron magnets

    International Nuclear Information System (INIS)

    Martin, P.S.

    1987-01-01

    The operational experience with the Fermilab Tevatron is presented, with emphasis on reliability and failure modes. Comparisons are made between the operating efficiencies for the superconducting machine and for the conventional Main Ring

  9. Operational experience with superconducting synchrotron magnets

    International Nuclear Information System (INIS)

    Martin, P.S.

    1987-03-01

    The operational experience with the Fermilab Tevatron is presented, with emphasis on reliability and failure modes. Comprisons are made between the operating efficiencies for the superconducting machine and for he conventional Main Ring

  10. Aging of nuclear station diesel generators: Evaluation of operating and expert experience: Phase 1, Study

    International Nuclear Information System (INIS)

    Hoopingarner, K.R.; Vause, J.W.; Dingee, D.A.; Nesbitt, J.F.

    1987-08-01

    Pacific Northwest Laboratory evaluated operational and expert experience pertaining to the aging degradation of diesel generators in nuclear service. The research, sponsored by the US Nuclear Regulatory Commission (NRC), identified and characterized the contribution of aging to emergency diesel generator failures. This report, Volume I, reviews diesel-generator experience to identify the systems and components most subject to aging degradation and isolates the major causes of failure that may affect future operational readiness. Evaluations show that as plants age, the percent of aging-related failures increases and failure modes change. A compilation is presented of recommended corrective actions for the failures identified. This study also includes a review of current, relevant industry programs, research, and standards. Volume II reports the results of an industry-wide workshop held on May 28 and 29, 1986 to discuss the technical issues associated with aging of nuclear service emergency diesel generators

  11. ETSON proposal on the European operational experience feedback system

    International Nuclear Information System (INIS)

    Maqua, Michael; Bertrand, Remy; Gelder, Pieter de

    2007-01-01

    The new IAEA Safety Fundamentals states regarding the operating experience feedback: The feedback of operating experience from facilities and activities - and, where relevant, from elsewhere - is a key means of enhancing safety. Processes must be put in place for the feedback and analysis of operating experience, including initiating events, accident precursors, near misses, accidents and unauthorized acts, so that lessons may be learned, shared and acted upon. This presentation deals with the proposal of the ETSON (European TSO Network) to optimize the European operating experiences feedback (OEF). It is generally recognized that the efficiency of nuclear safety supervision by public authorities is based on two key requirements: - the existence of a competent authority at national level, benefiting from an appropriate legislative and regulatory basis, from adequate (quantitatively and qualitatively) human resources, particularly for inspection purposes, - the availability of resources devoted to highly specialised independent technical expertise, in order to provide competent authorities with pertinent technical opinions on: -- the safety files provided by operators, for the purpose of licensing corresponding activities, -- the exploitation for regulatory purposes of the operating experience feed back from licensed nuclear installations. There are two worldwide systems intended to learn lessons from experience: the WANO (World Association of Nuclear Operators) system established by the licensees with access restricted to operating organizations and the IRS system jointly operated by IAEA and OECD/NEA accessible to regulators and to some other users nominated by the regulators in their countries. The IRS itself is dedicated to the analysis of safety significant operating events. NEA/CNRA runs a permanent working group on operating experience (WGOE). WGOE provides among other things also generic reports on safety concerns related to operating experiences and

  12. Ontario Hydro CANDU operating experience

    International Nuclear Information System (INIS)

    Jackson, H.A.; Woodhead, L.W.; Fanjoy, G.R.

    1984-03-01

    The CANDU Pressurized Heavy Water (CANDU-PHW) type of nuclear-electric generating station has been developed jointly by Atomic Energy of Canada Limited and Ontario Hydro. This report highlights Ontario Hydro's operating experience using the CANDU-PHW system, with a focus on the operating performance and costs, reliability of system components and nuclear safety considerations for the workers and the public

  13. FFTF operational experience

    International Nuclear Information System (INIS)

    Newland, D.J.; Krupar, J.J.

    1984-01-01

    In April 1982, the FFTF began its first nominally 100 day irradiation cycle. Since that time the plant has operated very well with steadily increasing plant capacity factors during its first four cycles. One hundred fifty fuel assemblies (eighty of which are experiments) and over 32,000 individual fuel pins have been irradiated, some in excess of 100 MWd/Kg burnup. Specialized equipment and systems unique to sodium cooled reactor plants have performed well

  14. Steam generator operating experience update, 1982-1983

    International Nuclear Information System (INIS)

    Frank, L.

    1984-06-01

    This report is a continuation of earlier reports by the staff addressing pressurized water reactor steam generator operating experience. NUREG-0886, Steam Generator Tube Experience, published in February 1982 summarized experience in domestic and foreign plants through December 1981. This report summarizes steam generator operating experience in domestic plants for the years 1982 and 1983. Included are new problems encountered with secondary-side loose parts, sulfur-induced stress-assisted corrosion cracking, and flow-induced vibrational wear in the new preheater design steam generators. The status of Unresolved Safety Issues A3, A4, and A5 is also discussed

  15. Impact of LMFBR operating experience on PFBR design

    International Nuclear Information System (INIS)

    Bhoje, S.B.; Chetal, S.C.; Chellapandi, P.; Govindarajan, S.; Lee, S.M.; Kameswara Rao, A.S.L.; Prabhakar, R.; Raghupathy, S.; Sodhi, B.S.; Sundaramoorthy, T.R.; Vaidyanathan, G.

    2000-01-01

    PFBR is a 500 MWe, sodium cooled, pool type, fast breeder reactor currently under detailed design. It is essential to reduce the capital cost of PFBR in order to make it competitive with thermal reactors. Operating experience of LMFBRs provides a vital input towards simplification of the design, improving its reliability, enhancing safety and achieving overall cost reduction. This paper includes a summary of LMFBR operating experience and details the design features of PFBR as influenced by operating experience of LMFBRs. (author)

  16. Emergency planning and operating experience

    International Nuclear Information System (INIS)

    Halpern, O.; Breniere, J.

    1984-01-01

    The purpose of this paper is to derive lessons from operating experience for the planning of emergency measures. This operating experience has two facets: it is obtained not only from the various incidents and accidents which have occurred in countries with nuclear power programmes and from the resulting application of emergency plans but also from the different exercises and simulations carried out in France and in other countries. Experience generally confirms the main approaches selected for emergency plans. The lessons to be derived are of three types: first, it appears necessary to set forth precisely the responsibilities of each person involved in order to prevent a watering-down of decisions in the event of an accident; secondly, considerable improvements need to be made in the different communication networks to be used; and thirdly, small accidents with minor radiological consequences deserve as systematic and thorough an approach as large and more improbable accidents. (author)

  17. Operating practical experience at Argentina

    International Nuclear Information System (INIS)

    Quihillalt, Oscar

    1997-01-01

    Operating experiences of Atucha-1 and Embalse Nuclear Power Plants were discussed in this work. The technical and economic aspects, such as reliability, availability, personnel training, operating costs, prices and market, which exercise influence upon Argentina nuclear energy policy, mainly on the power electric generation by nuclear power plants were considered. Finally the current status of the nucleoelectric sector in Argentina and forecasting were analysed

  18. Accelerator/Experiment Operations - FY 2016

    International Nuclear Information System (INIS)

    Blake, A.; Convery, M.; Geer, S.; Geesaman, D.; Harris, D.; Johnson, D.; Lang, K.; McFarland, K.; Messier, M.; Moore, C. D.; Newhart, D.; Reimer, P. E.; Plunkett, R.; Rominsky, M.; Sanchez, M.; Schmidt, J. J.; Shanahan, P.; Tate, C.; Thomas, J.; Donatella Torretta, Donatella Torretta; Matthew Wetstein, Matthew Wetstein

    2016-01-01

    This Technical Memorandum summarizes the Fermilab accelerator and experiment operations for FY 2016. It is one of a series of annual publications intended to gather information in one place. In this case, the information concerns the FY 2016 NOvA, MINOS+ and MINERvA experiments using the Main Injector Neutrino Beam (NuMI), the MicroBooNE experiment and the activities in the SciBooNE Hall using the Booster Neutrino Beam (BNB), and the SeaQuest experiment, LArIAT experiment and Meson Test Beam activities in the 120 GeV external switchyard beam (SY120). Each section was prepared by the relevant authors, and was then edited for inclusion in this summary.

  19. Accelerator/Experiment Operations - FY 2016

    Energy Technology Data Exchange (ETDEWEB)

    Blake, A. [Argonne National Lab. (ANL), Argonne, IL (United States); Convery, M. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Geer, S. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Geesaman, D. [Argonne National Lab. (ANL), Argonne, IL (United States); Harris, D. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Johnson, D. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Lang, K. [Argonne National Lab. (ANL), Argonne, IL (United States); McFarland, K. [Argonne National Lab. (ANL), Argonne, IL (United States); Messier, M. [Argonne National Lab. (ANL), Argonne, IL (United States); Moore, C. D. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Newhart, D. [Fermilab; Reimer, P. E. [Argonne; Plunkett, R. [Fermilab; Rominsky, M. [Fermilab; Sanchez, M. [Iowa State U.; Schmidt, J. J. [Fermilab; Shanahan, P. [Fermilab; Tate, C. [Fermilab; Thomas, J. [University Coll. London; Donatella Torretta, Donatella Torretta [Fermilab; Matthew Wetstein, Matthew Wetstein [Iowa State University

    2016-10-01

    This Technical Memorandum summarizes the Fermilab accelerator and experiment operations for FY 2016. It is one of a series of annual publications intended to gather information in one place. In this case, the information concerns the FY 2016 NOvA, MINOS+ and MINERvA experiments using the Main Injector Neutrino Beam (NuMI), the MicroBooNE experiment and the activities in the SciBooNE Hall using the Booster Neutrino Beam (BNB), and the SeaQuest experiment, LArIAT experiment and Meson Test Beam activities in the 120 GeV external switchyard beam (SY120). Each section was prepared by the relevant authors, and was then edited for inclusion in this summary.

  20. The ATLAS Tier-0 Overview and operational experience

    CERN Document Server

    Elsing, M; Nairz, A; Negri, G

    2010-01-01

    Within the ATLAS hierarchical, multi-tier computing infrastructure, the Tier-0 centre at CERN is mainly responsible for prompt processing of the raw data coming from the online DAQ system, to archive the raw and derived data on tape, to register the data with the relevant catalogues and to distribute them to the associated Tier-1 centers. The Tier-0 is already fully functional. It has been successfully participating in all cosmic and commissioning data taking since May 2007, and was ramped up to its foreseen full size, performance and throughput for the cosmic (and short single-beam) run periods between July and October 2008. Data and work flows for collision data taking were exercised in several "Full Dress Rehearsals" (FDRs) in the course of 2008. The transition from an expert to a shifter-based system was successfully established in July 2008. This article will give an overview of the Tier-0 system, its data and work flows, and operations model. It will review the operational experience gained in cosmic, c...

  1. The Component Operational Experience Degradation and Ageing Program (CODAP). Review and lessons learned (2011-2014)

    International Nuclear Information System (INIS)

    Dragea, Tudor; Riznic, Jovica R.

    2015-01-01

    The structural integrity of piping systems is crucial to continuous and safe operation of nuclear power plants. Across all designs, the pressure boundary and its related piping and components, form one of the many levels of defense in the continuous and safe operation of a nuclear power plant. It is therefore necessary to identify, understand, evaluate and catalogue all of the various degradation mechanisms and failures that affect various piping systems and components across all nuclear power plants (NPP's). This need was first recognized in 1994 by the Swedish Nuclear Power Inspectorate (SKI) which launched a five-year Research and Development (R and D) project to explore the viability of creating an international pipe failure database (SKI-PIPE) (Riznic, 2007). The project was considered to be very successful and in 2002, the Organization for Economic Co-operation and Development (OECD) Pipe Failure Data Exchange (OPDE) was created. OPDE was operated under the umbrella of the OECD Nuclear Energy Agency (NEA) and was created in order to produce an international database on the piping service experience applicable to commercial nuclear power plants. After the successful completion of OPDE, the OECD, as well as other international members, agreed to participate in OPDE's successor: the Component Operational Experience Degradation and Ageing Program (CODAP). The objective of CODAP is to collect information on all possible events related to the failure and degradation of passive metallic components in NPP's. With CODAP winding down to the completion of its first phase in December 2014, this report will focus on the conclusions and the lessons learned throughout the many years of CODAP's implementation. There are currently 14 countries participating in CODAP, many of whom are industry leaders (France, Canada, U.S.A., Germany, Japan, Korea etc.). This cooperation on an international scale provides a library of OPerational EXperience (OPEX) for all participating NPP

  2. EBR-II: twenty years of operating experience

    International Nuclear Information System (INIS)

    Lentz, G.L.; Buschman, H.W.; Smith, R.N.

    1985-01-01

    Experimental Breeder Reactor No. 2 (EBR-II) is an unmoderated, sodium-cooled reactor with a design power of 62.5 MWt. For the last 20 years EBR-II has operated safely, has demonstrated stable operating characteristics, has shown excellent performance of its sodium components, and has had an excellent plant factor. These years of operating experience provide a valuable resource to the nuclear community for the development and design of future liquid metal fast reactors. This report provides a brief description of the EBR-II plant and its early operating experience, describes some recent problems of interest to the nuclear community, and also mentions some of the significant operating achievements of EBR-II. Finally, a few words and speculations on EBR-II's future are offered. 4 figs., 1 tab

  3. Accelerator/Experiment Operations - FY 2015

    Energy Technology Data Exchange (ETDEWEB)

    Czarapata, P. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); et al.

    2015-10-01

    This Technical Memorandum summarizes the Fermilab accelerator and experiment operations for FY 2015. It is one of a series of annual publications intended to gather information in one place. In this case, the information concerns the FY 2015 NOvA, MINOS+ and MINERvA experiments using the Main Injector Neutrino Beam (NuMI), the activities in the SciBooNE Hall using the Booster Neutrino Beam (BNB), and the SeaQuest experiment and Meson Test Beam (MTest) activities in the 120 GeV external Switchyard beam (SY120).

  4. Proceedings of the NEA/CSNI-UNIPEDE Specialist Meeting on Operating Experience with Steam Generators

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1991-07-01

    The long history of operating experience with pressurized water reactors has indicated that the steam generators are of primary importance in nuclear power plant design and operation; this is furthermore confirmed by analyzing the data of the Incident Reporting System (IRS). It is for this reason that the OECD/NEA Committee on the Safety of Nuclear Installations organizes, in cooperation with UNIPEDE, a Specialist Meeting on 'Operating Experience with Steam Generators'. This Specialist Meeting, held in Brussels, Belgium, in September 1991, is hosted by the Belgian Government and AIB-Vincotte Nuclear. In addition to being a follow-up to the October 1984 meeting (organized by the CSNI and UNIPEDE in Stockholm, Sweden), this Meeting reviews the current state-of-the-art of steam generator technology thus providing a forum for the exchange of related experience in operation, inspection, maintenance, repair, modifications, replacement, and licensing requirements pertaining to steam generators. Forty-seven papers are presented in eight sessions entitled: Operating Experience (two sessions), Structural Integrity and Licensing Issues, Analysis and Prediction of Degradation Mechanisms, Inservice Inspection Methods, Preventive and Corrective Actions (two sessions) and Replacement of Steam Generators. There are furthermore two panel sessions entitled 'Observed Degradation Mechanisms and Licensing Positions', and 'Inspection, Repair and Replacement Strategies'. These proceedings consist of a compilation of the papers presented at the Meeting, which is attended by more than one hundred and fifty participants from fifteen countries and several international organisations.

  5. Survey of operating experience from LERs to identify aging trends

    International Nuclear Information System (INIS)

    Murphy, G.A.

    1985-01-01

    The results of a study using the Oak Ridge National Laboratory's Nuclear Operations Analysis Center computer files of operating experience reports [licensee event reports (LERs), abnormal occurrences, etc.] are summarized in this study, specific time-related degradation mechanisms are identified as possible causes of a reportable occurrence. Data collected on domestic commercial nuclear power plants covering 1969 to 1982 yielded over 5800 events attributable to possible age related failures. Of these events, 2795 were attributable to instrument drift and are addressed separately in the report. The remaining events (3098) were reviewed, and data were collected for each event, which identified the specific system, component, and subpart: the information included the age-related mechanism, severity of the failure, and method of detection of the failure. About two-thirds of the failures were judged to be degraded, with one-third listed as catastrophic

  6. IAEA Operational Safety Team Review Bohunice Nuclear Power Plant, Slovak Republic

    International Nuclear Information System (INIS)

    2010-01-01

    Full text: An international team of nuclear installation safety experts, led by the International Atomic Energy Agency (IAEA), has reviewed Slovakia's Bohunice Nuclear Power Plant (BNPP) for its safety practices and has noted a series of good practices as well as recommendations to reinforce them. The IAEA assembled an international team of experts at the request of the Government of Slovak Republic to conduct an Operational Safety Review (OSART) of Bohunice NPP. Under the leadership of the IAEA's Division of Nuclear Installation Safety, the OSART team performed an in-depth operational safety review from 1 to 18 November 2010. The team was made up of experts from Belgium, Canada, China, the Czech Republic, France, Sweden, the United Kingdom and the IAEA. An OSART mission is designed as a review of programmes and activities essential to operational safety. It is not a regulatory inspection, nor is it a design review or a substitute for an exhaustive assessment of the plant's overall safety status. The team at BNPP conducted an in-depth review of the aspects essential to the safe operation of the NPP, which largely is under the control of the site management. The conclusions of the review are based on the IAEA's Safety Standards and proven good international practices. The review covered the areas of Management, Organization and Administration; Operations; Maintenance; Technical Support; Operating Experience; Radiation Protection; Chemistry and Emergency Planning and Preparedness. Long Term Operation assessment has been requested by the plant in addition to the standard OSART program. The OSART team has identified good plant practices which will be shared with the rest of the nuclear industry for consideration of their application. Examples include: BNPP has implemented a comprehensive set of technical and organizational measures which have significantly reduced the production of liquid radioactive waste; BNPP has developed an automatic transfer of dosimetry data

  7. Principal working group No. 1 on operating experience and human factors (PWG1). Report of the task group on reviewing the activities

    International Nuclear Information System (INIS)

    2001-02-01

    A Task Group was formed by PWG-1 in the latter part of 1999 to review the mandate of PWG1 in light of new directions and assignments from CSNI, and to prepare a report that suggests future directions of the Working Group, in harmony with directions from CSNI. This report is the response of the Task Group. Principal Working Group no.1 was organized in September 1982. The group formed its charter, which included: - reviewing periodically activities for the collection, dissemination, storage and analysis of incidents reported under the IRS; - examining annually the incidents reported during the previous year in order to select issues (either technical or human-factor-oriented) with major safety significance and report them to CSNI; - encouraging feed-back through CSNI of lessons derived from operating experience to nuclear safety research programmes, including human factors studies; - providing a forum to exchange information in the field of human factors studies; - establishing short-term task forces, when necessary to carry out information exchange, special studies or any other work within its mandate; - making recommendations to CSNI for improving and encouraging these activities. The mandate of the working group was systematically re-examined in 1994. The purpose was to determine whether changes since the formation of the original mandate would indicate some need to refocus the directions of the working group. It was concluded that the main line of work (sometimes called the core business) of PWG1, which was shown to be an efficient tool for exchanging safety-significant operating experience and lessons learned from safety-significant issues, remained as valid and necessary in 1994 as it was in 1982. Some recommendations for improvement of efficiency were made, but the core business was unchanged. Very little of the mandate needed modification. With little change over nearly 20 years, these six items have constituted the mandate of PWG1. There have been twenty

  8. Accelerator/Experiment operations - FY 2006

    Energy Technology Data Exchange (ETDEWEB)

    Brice, S.; Conrad, J.; Denisov, D.; Ginther, G.; Holmes, S.; James, C.; Lee, W.; Louis, W.; Moore, C.; Plunkett, R.; Raja, R.; /Fermilab

    2006-10-01

    This Technical Memorandum (TM) summarizes the Fermilab accelerator and experiment operations for FY 2006. It is one of a series of annual publications intended to gather information in one place. In this case, the information concerns the FY 2006 Run II at the Tevatron Collider, the MiniBooNE experiments running in the Booster Neutrino Beam in neutrino and antineutrino modes, MINOS using the Main Injector Neutrino Beam (NuMI), and SY 120 activities.

  9. Incorporating operational experience and design changes in availability forecasts

    International Nuclear Information System (INIS)

    Norman, D.

    1988-01-01

    Reliability or availability forecasts which are based solely on past operating experience will be precise if the sample is large enough, and unbiased if nothing in the future design, environment, operating region or anything else changes. Unfortunately, life is never like that. This paper considers the methodology and philosophy of modifying forecasts based on past experience to take account also of changes in design, construction methods, operating philosophy, environments, operator training and so on, between the plants which provided the operating experience and the plant for which the forecast is being made. This emphasises the importance of collecting, assessing, and learning from past data and of a thorough knowledge of future designs, and procurement, operation, and maintenance policies. The difference between targets and central estimates is also discussed. The paper concludes that improvements in future availability can be made by learning from past experience, but that certain conditions must be fulfilled in order to do so. (author)

  10. BN-600 power unit 15-year operating experience

    International Nuclear Information System (INIS)

    Saraev, O.M.; Oshkanov, N.N.; Vylomov, V.V.

    1996-01-01

    Comprehensive experience has been gained with the operating fast reactor BN-600 with a power out of 600 MWe. This paper includes important performance results and gives also an overview of the experience gained from BN-600 NPP commercial operation during 15 years. (author). 2 figs, 1 tab

  11. Recent operating experiences and programs at EBR-II

    International Nuclear Information System (INIS)

    Lentz, G.L.

    1984-01-01

    Experimental Breeder Reactor No. II (EBR-II) is a pool-type, unmoderated, sodium-cooled reactor with a design power of 62.5 MWt and an electrical generation capability of 20 MW. It has been operated by Argonne National Laboratory for the US government for almost 20 years. During that time, it has operated safely and has demonstrated stable operating characteristics, high availability, and excellent performance of its sodium components. The 20 years of operating experience of EBR-II is a valuable resource to the nuclear community for the development and design of future LMFBR's. Since past operating experience has been extensively reported, this report will focus on recent programs and events

  12. Operational experience with Dragon reactor experiment of relevance to commercial reactors

    International Nuclear Information System (INIS)

    Capp, P.D.; Simon, R.A.

    1976-01-01

    An important part of the experience gained during the first ten years of successful power operation of the Dragon Reactor is relevant to the design and operation of future High Temperature Reactors (HTRs). The aspects presented in this paper have been chosen as being particularly applicable to larger HTR systems. Core performance under a variety of conditions is surveyed with particular emphasis on a technique developed for the identification and location of unpurged releasing fuel and the presence of activation and fission products in the core area. The lessons learned during the reflector block replacement are presented. Operating experience with the primary circuit identifies the lack of mixing of gas streams within the hot plenum and the problems of gas streaming in ducts. Helium leakage from the circuit is often greater than the optimum 0.1%/d. Virtually all the leakage problems are associated with the small bore instrument pipework essential for the many experiments associated with the Dragon Reactor Experiment (DRE). Primary circuit maintenance work confirms the generally clean state of the DRE circuit but identifies 137 Cs and 110 Agsup(m) as possible hazards if fuel emitting these isotopes is irradiated. (author)

  13. Operational experience of the Marcoule reactors

    International Nuclear Information System (INIS)

    Conte, F.

    1963-01-01

    The results obtaining from three years operation of the reactors G-2, G-3 have made it possible to accumulate a considerable amount of operational experience of these reactors. The main original points: - the pre-stressed concrete casing - the possibility of loading while under power - automatic temperature control have been perfectly justified by the results of operation. The author confirms the importance of these original solutions and draws conclusions concerning the study of future nuclear power stations. (author) [fr

  14. SALTO guidelines. Guidelines for peer review of long term operation and ageing management of nuclear power plants

    International Nuclear Information System (INIS)

    2008-01-01

    The average age of nuclear power plants (NPPs) connected to the grid worldwide is increasing. About 20% of all the power reactors operating worldwide have been in operation for more than 30 years, and almost 50% have been in operation for 20 to 30 years, while a rather limited number of new NPPs are being put into operation. In view of this trend, many countries are giving a high priority to continuing the operation of NPPs beyond the time frame originally anticipated (e.g. 30 or 40 years). Long term operation (LTO) for NPPs is operation beyond the established time frame originally set forth by the license term, design limits, standards or regulations. LTO needs to be justified by a safety assessment considering life limiting processes and features for structures, systems and components. Proper and safe LTO is based on the experience and practices of various countries in areas such as plant license renewal, life extension, continued operation and life management. Other activities, including periodic safety review, ageing management and plant modification, are also relevant to LTO. Ageing management of an NPP is an important activity that must be considered before and in conjunction with the decision to enter LTO. Ageing management of NPPs deals with the physical ageing of structures, systems and components (SSCs) that can result in the degradation of their performance characteristics. Thus ageing management helps ensure that SSCs important to safety remain capable of performing their required safety functions. An effective ageing management programme (AMP) is a key element of the safe and reliable operation of NPPs during the originally planned time frame originally planned for their operation, as well as for the period of LTO. In order to assist Member States in managing ageing effectively, the IAEA is developing related safety standards and guidance publications. International peer review is a useful tool for Member States to exchange experience, learn from each

  15. Treatment of operational experience of nuclear power plants in WANO

    International Nuclear Information System (INIS)

    Ibanez, M.

    2013-01-01

    The article describes the activities associated to the Operating Experience Programme of the World Association of Nuclear Operators. The programme manages the event reports submitted by the nuclear power plants to the WANO database for the preparation by the Operating Experience Central Team of some documents like the significant Operating Experience Reports and Significant Event Reports that help the stations to avoid similar events. (Author)

  16. Entering 'A NEW REALM' of KIBO Payload Operations - Continuous efforts for microgravity experiment environment and lessons learned from real time experiment operations in KIBO -

    International Nuclear Information System (INIS)

    Sakagami, K; Goto, M; Matsumoto, S; Ohkuma, H

    2011-01-01

    On January 22nd, 2011(JST), KOUNOTORI2 (H-II Transfer Vehicle: HTV2) was successfully launched from Tanegashima Space Center toward the International Space Station (ISS) and two new JAXA payload racks, Kobairo rack and MSPR (Multi-purpose Small Payload Rack) were transferred to ISS/KIBO (Japanese Experiment Module: JEM). In addition to Saibo rack and Ryutai rack which are already in operation in KIBO, in total 4 Japanese experiment payload racks start operations in KIBO. Then KIBO payload operations embark on a new realm, full utilization phase. While the number and variety of microgravity experiments become increasing, simultaneous operation constraints should be considered to achieve multitask payload operations in ISS/KIBO and ever more complicated cooperative operations between crewmember and flight control team/science team are required. Especially for g-jitter improvement in ISS/KIBO, we have greatly advanced cooperative operations with crewmember in the recent increment based on the microgravity data analysis results. In this paper, newly operating Japanese experiment payloads characteristics and some methods to improve g-jitter environment are introduced from the front line of KIBO payload operations.

  17. Operational readiness review phase-1 final report for WRAP-1

    Energy Technology Data Exchange (ETDEWEB)

    Bowen, W., Westinghouse Hanford

    1996-12-27

    This report documents the Operational Readiness Review for WRAP-1 Phase-1 operations. The report includes all criteria, lines of inquiry with resulting Findings and Observations. The review included assessing operational capability of the organization and the computer controlled process and facility systems.

  18. Design/Operations review of core sampling trucks and associated equipment

    International Nuclear Information System (INIS)

    Shrivastava, H.P.

    1996-01-01

    A systematic review of the design and operations of the core sampling trucks was commissioned by Characterization Equipment Engineering of the Westinghouse Hanford Company in October 1995. The review team reviewed the design documents, specifications, operating procedure, training manuals and safety analysis reports. The review process, findings and corrective actions are summarized in this supporting document

  19. USA/FBR program status FFTF operations startup experience

    International Nuclear Information System (INIS)

    Moffitt, W.C.; Izatt, R.D.

    1981-06-01

    This paper gives highlights of the major Operations evaluations and operational results of the startup acceptance testing program and initiation of normal operating cycles for experiment irradiation in the FFTF. 33 figures

  20. Experience on operational safety improvement of control and operation support systems

    International Nuclear Information System (INIS)

    Itoh, N.; Nakagawa, T.; Mano, K.

    1988-01-01

    Japanese nuclear industry started in 1956 and about 30 years have passed since that time. Through these years, we have made a lot of efforts and developments in the field of Control and Instrumentation (C and I) system. The above 30 years and following years can be divided into four major periods. The first one is the period of research, the second of domestic production, the third of improvement, and the fourth of advancement. Improvements of C and I system, which we have made in those periods have made a great contribution to enhancement of reliability, availability and operability of nuclear power plants. Fig. 1 shows TEPCO's nuclear power plant (BWR) construction experience and technical trend of C and I system in Japan. This paper is to introduce the efforts and operational experience on control and operation support systems

  1. Vascular Trauma Operative Experience is Inadequate in General Surgery Programs.

    Science.gov (United States)

    Yan, Huan; Maximus, Steven; Koopmann, Matthew; Keeley, Jessica; Smith, Brian; Virgilio, Christian de; Kim, Dennis Y

    2016-05-01

    Vascular injuries may be challenging, particularly for surgeons who have not received formal vascular surgery fellowship training. Lack of experience and improper technique can result in significant complications. The objective of this study was to examine changes in resident experience with operative vascular trauma over time. A retrospective review was performed using Accreditation Council for Graduate Medical Education (ACGME) case logs of general surgery residents graduating between 2004 and 2014 at 2 academic, university-affiliated institutions associated with level 1 trauma centers. The primary outcome was number of reported vascular trauma operations, stratified by year of graduation and institution. A total of 112 residents graduated in the study period with a median 7 (interquartile range 4.5-13.5) vascular trauma cases per resident. Fasciotomy and exposure and/or repair of peripheral vessels constituted the bulk of the operative volume. Linear regression showed no significant trend in cases with respect to year of graduation (P = 0.266). Residents from program A (n = 53) reported a significantly higher number of vascular trauma cases when compared with program B (n = 59): 12.0 vs. 5.0 cases, respectively (P < 0.001). Level 1 trauma center verification does not guarantee sufficient exposure to vascular trauma. The operative exposure in program B is reflective of the national average of 4.0 cases per resident as reported by the ACGME, and this trend is unlikely to change in the near future. Fellowship training may be critical for surgeons who plan to work in a trauma setting, particularly in areas lacking vascular surgeons. Copyright © 2016 Elsevier Inc. All rights reserved.

  2. US remote monitoring operational experience

    International Nuclear Information System (INIS)

    Dupree, S.A.; Sonnier, C.S.

    1997-01-01

    Under international partnerships and bilateral agreements with the U.S. Department of Energy, Sandia National Laboratories, other national laboratories, and international partner organizations have emplaced remote monitoring systems in nuclear facilities and laboratories in various parts of the world for the purpose of conducting field trials of remote monitoring. The purpose of the present report is to review the results from these field trials and draw general conclusions regarding the trials. Many thousands of hours of sensor and system operation have been logged, and data have been retrieved from many locations. In virtually all cases the system components have functioned as intended and data have been successfully collected and transmitted for review. Comparisons between front-end-triggered video and time-lapse video have shown that the triggered record has captured all relevant monitored operations at the various nuclear facilities included in the field trials. We believe the utility and functional reliability of remote monitoring for international safeguards has been shown. However, it should be kept in mind that openness and transparency, including some form of short-notice inspections, are likely to be prerequisites to the safeguards implementation of remote monitoring in any State

  3. Halden fuel and material experiments beyond operational and safety limits

    International Nuclear Information System (INIS)

    Volkov, Boris; Wiesenack, Wolfgang; McGrath, M.; Tverberg, T.

    2014-01-01

    One of the main tasks of any research reactor is to investigate the behavior of nuclear fuel and materials prior to their introduction into the market. For commercial NPPs, it is important both to test nuclear fuels at a fuel burn-up exceeding current limits and to investigate reactor materials for higher irradiation dose. For fuel vendors such tests enable verification of fuel reliability or for the safety limits to be found under different operational conditions and accident situations. For the latter, in-pile experiments have to be performed beyond some normal limits. The program of fuel tests performed in the Halden reactor is aimed mainly at determining: The thermal FGR threshold, which may limit fuel operational power with burn-up increase, the “lift-off effect” when rod internal pressure exceeds coolant pressure, the effects of high burn-up on fuel behavior under power ramps, fuel relocation under LOCA simulation at higher burn-up, the effect of dry-out on high burn-up fuel rod integrity. This paper reviews some of the experiments performed in the Halden reactor for understanding some of the limits for standard fuel utilization with the aim of contributing to the development of innovative fuels and cladding materials that could be used beyond these limits. (author)

  4. Operational experience with SLAC's beam containment electronics

    International Nuclear Information System (INIS)

    Constant, T.N.; Crook, K.; Heggie, D.

    1977-03-01

    Considerable operating experience was accumulated at SLAC with an extensive electronic system for the containment of high power accelerated beams. Average beam power at SLAC can approach 900 kilowatts with the potential for burning through beam stoppers, protection collimators, and other power absorbers within a few seconds. Fast, reliable, and redundant electronic monitoring circuits have been employed to provide some of the safeguards necessary for minimizing the risk to personnel. The electronic systems are described, and the design philosophy and operating experience are discussed

  5. ORSERG resource book. Operational reactor safety engineering and review group. Final report, March 1992

    International Nuclear Information System (INIS)

    1992-03-01

    EPRI has prepared this resource book to help utilities with their Self-Assessment Programs at nuclear power plants. Self-assessments are reviews performed by nuclear power plant utilities to monitor plant performance status and adequacy, identify trends in operational activities important to safety, and assess the impact of these trends on plant safety. Activities performed as self-assessments include reviews and evaluations of plant performance and abnormal events, technical evaluations of plant activities to identify potential problem areas, and reviews of other sources of plant design and operating experience for applicability to safety. This resource book is based on information obtained from utilities and includes examples of activities and methods that have proven effective. The resource book includes a summary of NRC requirements, guidelines for self-assessment program planning, descriptions and examples of investigative techniques, and key references that can be consulted for additional information. It can serve as a training guide for plant staff members who are assigned to self-assessment activities. (author)

  6. Concluding from operating experience to instrumentation and control systems

    International Nuclear Information System (INIS)

    Pleger, H.; Heinsohn, H.

    1997-01-01

    Where conclusions are drawn from operating experience to instrumentation and control systems, two general statements should be made. First: There have been braekdowns, there have also been deficiencies, but in principle operating experience with the instrumentation and control systems of German nuclear power plants has been good. With respect to the debates about the use of modern digital instrumentation and control systems it is safe to say, secondly, that the instrumentation and control systems currently in use are working reliably. Hence, there is no need at present to replace existing systems for reasons of technical safety. However, that time will come. It is a good thing, therefore, that the use of modern digital instrumentation and control systems is to begin in the field of limiting devices. The operating experience which will thus be accumulated will benefit digital instrumentation and control systems in their qualification process for more demanding applications. This makes proper logging of operating experience an important function, even if it cannot be transferred in every respect. All parties involved therefore should see to it that this operating experience is collected in accordance with criteria agreed upon so as to prevent unwanted surprises later on. (orig.) [de

  7. Review of decision aids for nuclear-plant operators

    International Nuclear Information System (INIS)

    Kisner, R.A.

    1983-01-01

    Responses to various computer-based operational aids varied widely in detail, thus forcing distillation of the salient features of many operational aids from information sources other than the initial questionnaire. These sources included technical and management presentations, technical papers and reports, personal discussions, taped responses, sales brochures, system specifications and schematics, and other documents. The data base is dynamic, not static, owing to the nature of current trends in operational aid development. The information contained in it is subject to review and revision by the developing organizations. More systems are pending review and entry into the data base; hence the list is incomplete

  8. [Operating Room Nurses' Experiences of Securing for Patient Safety].

    Science.gov (United States)

    Park, Kwang Ok; Kim, Jong Kyung; Kim, Myoung Sook

    2015-10-01

    This study was done to evaluate the experience of securing patient safety in hospital operating rooms. Experiential data were collected from 15 operating room nurses through in-depth interviews. The main question was "Could you describe your experience with patient safety in the operating room?". Qualitative data from the field and transcribed notes were analyzed using Strauss and Corbin's grounded theory methodology. The core category of experience with patient safety in the operating room was 'trying to maintain principles of patient safety during high-risk surgical procedures'. The participants used two interactional strategies: 'attempt continuous improvement', 'immersion in operation with sharing issues of patient safety'. The results indicate that the important factors for ensuring the safety of patients in the operating room are manpower, education, and a system for patient safety. Successful and safe surgery requires communication, teamwork and recognition of the importance of patient safety by the surgical team.

  9. Irradiated Concrete in Nuclear Power Plants: Bridging the Gap in Operational Experience

    International Nuclear Information System (INIS)

    Hohmann, Brian P.; Esselman, Thomas C.; Wall, James J.

    2012-01-01

    The world's fleet of operating nuclear power plants (NPP) has been in-service for more than 20 years. In order to support the increasing demand for inexpensive power, many plants will be required to operate beyond 40 years, which was the original licensing period for existing NPPs. Improved knowledge of the performance of irradiated concrete is required to form a technical basis for long term operation (operation to 80+ years) of nuclear plants around the world. To date, operating experience (OE) of concrete subjected to irradiation has been acceptable, but there is an absence of data on this topic for extended periods of operation. The lack of empirical data has contributed to the difficulty of quantifying the long term behavior of concrete that is experiencing irradiation. Programs are in place that address other degradation mechanisms of concrete, but a clear and focused program is required on the effects of radiation. This paper presents a review of the available literature on the topic of the long-term irradiation effects on the mechanical properties of concrete, and provides a proposed methodology for the characterization of irradiated concrete removed from shut down or decommissioned commercial plants. (author)

  10. TSTA piping and flame arrestor operating experience data

    Energy Technology Data Exchange (ETDEWEB)

    Cadwallader, Lee C., E-mail: Lee.Cadwallader@inl.gov [Idaho National Laboratory, Idaho Falls, ID (United States); Willms, R. Scott [ITER International Organization, Cadarache (France)

    2015-10-15

    Highlights: • Experiences from the Tritium Systems Test Assembly were examined. • Failure rates of copper piping and a flame arrestor were calculated. • The calculated failure rates compared well to similar data from the literature. • Tritium component failure rate data support fusion safety assessment. - Abstract: The Tritium Systems Test Assembly (TSTA) was a facility dedicated to tritium handling technology and experiment research at the Los Alamos National Laboratory. The facility was operated with tritium for its research and development program from 1984 to 2001, running a prototype fusion fuel processing loop with ∼100 g of tritium as well as small experiments. There have been several operating experience reports written on this facility's operation and maintenance experience. This paper describes reliability analysis of two additional components from TSTA, small diameter copper gas piping that handled tritium in a nitrogen carrier gas, and the flame arrestor used in this piping system. The component failure rates for these components are discussed in this paper. Comparison data from other applications are also presented.

  11. Operator training and the training simulator experience

    International Nuclear Information System (INIS)

    Mills, D.

    The author outlines the approach used by Ontario Hydro to train operators from the day they are hired as Operators-in-Training until they are Authorized Unit First Operators. He describes in detail the use of the simulator in the final year of the authorization program, drawing on experience with the Pickering NGS A simulator. Simulators, he concludes, are important aids to training but by no means all that is required to guarantee capable First Operators

  12. Adverse childhood experience and asthma onset: a systematic review.

    Science.gov (United States)

    Exley, Daniel; Norman, Alyson; Hyland, Michael

    2015-06-01

    Adverse childhood experiences such as abuse and neglect are associated with subsequent immune dysregulation. Some studies show an association between adverse childhood experiences and asthma onset, although significant disparity in results exists in the published literature. We aimed to review available studies employing a prospective design that investigates associations between adverse childhood experience and asthma. A search protocol was developed and studies were drawn from four electronic journal databases. Studies were selected in accordance with pre-set inclusion criteria and relevant data were extracted. 12 studies, assessing data from a total of 31 524 individuals, were identified that investigate the impact of a range of adverse childhood experiences on the likelihood of developing asthma. Evidence suggests that chronic stress exposure and maternal distress in pregnancy operate synergistically with known triggers such as traffic-related air pollution to increase asthma risk. Chronic stress in early life is associated with an increased risk of asthma onset. There is evidence that adverse childhood experience increases the impact of traffic-related air pollution and inconsistent evidence that adverse childhood experience has an independent effect on asthma onset. Copyright ©ERS 2015.

  13. Operational safety experience reporting in the United States

    International Nuclear Information System (INIS)

    Hartfield, R.A.

    1978-01-01

    Licensees of nuclear power plants in the United States have many reporting requirements included in their technical specifications and the code of federal regulations, title 10. The Nuclear Regulatory Commisson receives these reports and utilizes them in its regulatory program. Part of this usage includes collecting and publishing this operating experience data in various reports and storing information in various data systems. This paper will discuss the data systems and reports on operating experience published and used by the NRC. In addition, some observations on operating experience will be made. Subjects included will be the Licensee Event Report (LER) Data File, the Operating Unit Status Report (Gray Book), Radiation Exposure Reports, Effluents Reports, the Nuclear Plant Reliability Data System, Current Events, Bulletin Wrapups and Annual Summaries. Some of the uses of the reports and systems will be discussed. The Abnormal Occurence Report to the US Congress will also be described and discussed. (author)

  14. Proceedings of 2nd PHWR operating safety experience meeting

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1991-04-01

    Papers presented during the eight sessions of the meeting were devoted to the impact of PHWR operating experience on design of civil structures (reactor building integrity); operating experiences related to pressure tubes, nuclear steam supply system, plant stability; reactor maintenance and control systems, reactor operational safety. Some events concerned with reactor shutdown due to power failures are described, as well as action undertaken to prevent major damage.

  15. Proceedings of 2nd PHWR operating safety experience meeting

    International Nuclear Information System (INIS)

    1991-04-01

    Papers presented during the eight sessions of the meeting were devoted to the impact of PHWR operating experience on design of civil structures (reactor building integrity); operating experiences related to pressure tubes, nuclear steam supply system, plant stability; reactor maintenance and control systems, reactor operational safety. Some events concerned with reactor shutdown due to power failures are described, as well as action undertaken to prevent major damage

  16. Operational safety performance indicator system at the Dukovany Nuclear Power Plant - Experience with indicator aggregation

    International Nuclear Information System (INIS)

    Mandula, J.

    2001-01-01

    The operational safety performance indicators serve as an important tool of performance monitoring and management at the Dukovany NPP. A software-supported system has been developed, which has included: data collection, central data storage, graphic output production and periodical report generation. Analyses of performance indicator trends together with evaluation in respect of annually updated target values and acceptance criteria are used for operational safety reviews forming an integral part of continual self-assessment process. This contribution has been focused on experience obtained during development of the operational safety assessment model using indicator aggregation. It summarises problems that had to be paid specific attention in the development process. Thanks to their solution, the model has become a synoptic monitor and a useful tool for operational safety assessment. (author)

  17. Parental involvement in their school-aged children's post-operative pain management in the hospital setting: a comprehensive systematic review.

    Science.gov (United States)

    Hoon, Lim Siew; Hong-Gu, He; Mackey, Sandra

    Paediatric pain management remains a challenge in clinical settings. Parents can contribute to the effective and accurate pain assessment and management of their child. No systematic reviews regarding the parental involvement in their child's post-operative pain management have been published. To determine the best available evidence regarding parental involvement in managing their children's post-operative pain in the hospital setting. The review considered studies that included parents of all ethnic groups with children aged between 6 to 12 years old who were hospitalised and undergone surgery of any kind with post-operative surgical or incision site pain where care was provided in acute hospital settings. The phenomena of interest were the experiences of parents in managing their children's post-operative pain. A three-step search strategy was utilised in each component of this review. Major databases searched included: MEDLINE, CINAHL, Scopus, ScienceDirect, the Cochrane library, PubMed as well as Google Scholar. The search included published studies and papers in English from 1990 to 2009. Each included study was assessed by two independent reviewers using the appropriate appraisal checklists developed by the Joanna Briggs Institute (JBI). Quantitative and qualitative data were extracted from the included papers using standardised data extraction tools from the JBI, Meta-analysis Statistics Assessment and Review Instrument data extraction tool for descriptive/case series and the JBI-Qualitative Assessment and Review Instrument data extraction tool for interpretive and critical research. The five quantitative studies included in this review were not suitable for meta-analysis due to clinical and methodological heterogeneity and therefore the findings are presented in a narrative form. The two qualitative studies were from the same study, therefore meta-synthesis was not possible. Hence the results of the studies were presented in a narrative format. Seven

  18. Operating experience of the automatic technological control system at the Kolsk NPP

    International Nuclear Information System (INIS)

    Volkov, A.P.; Ignatenko, E.I.; Kolomtsev, Yu.V.; Mel'nikov, E.F.; Trofimov, B.A.

    1981-01-01

    Briefly reviewed is operating experience of the automatic control systems of the kolsk NPP (KNPP) power units, where measuring technique of the neutron flux ''Iney'', ARM-4 power regulator, automatic turbine start-up system ATS are used. The main shortcomings of the technological process automatic control system (ACS) and ways of their removal are considered. It is noted that the KNPP ACS performs only limited start-up functions of the basic equipment and reactor power control as well as partially protection functions at instant loading drops and switch-off of the main circulating pump [ru

  19. Dry cooling tower operating experience in the LOFT reactor

    International Nuclear Information System (INIS)

    Hunter, J.A.

    1980-01-01

    A dry cooling tower has been uniquely utilized to dissipate heat generated in a small experimental pressurized water nuclear reactor. Operational experience revealed that dry cooling towers can be intermittently operated with minimal wind susceptibility and water hammer occurrences by cooling potential steam sources after a reactor scram, by isolating idle tubes from the external atmosphere, and by operating at relatively high pressures. Operating experience has also revealed that tube freezing can be minimized by incorporating the proper heating and heat loss prevention features

  20. Operating experience with the DRAGON High Temperature Reactor experiment

    International Nuclear Information System (INIS)

    Simon, R.A.; Capp, P.D.

    2002-01-01

    The Dragon Reactor Experiment in Winfrith/UK was a materials test facility for a number of HTR projects pursued in the sixties and seventies of the last century. It was built and managed as an OECD/NEA international joint undertaking. The reactor operated successfully between 1964 and 1975 to satisfy the growing demand for irradiation testing of fuels and fuel elements as well as for technological tests of components and materials. The paper describes the reactor's main experimental features and presents results of 11 years of reactor operation relevant for future HTRs. (author)

  1. The Clearing House on Operating Experience Feedback (CH-OEF)

    International Nuclear Information System (INIS)

    Tanarro Colodron, J.

    2016-01-01

    Full text: The Clearing House on Operating Experience Feedback (CH-OEF) is an online information system that contains three technical databases available only to registered users: 1) Operating Experience Feedback (OEF) records, containing information about events occurred at Nuclear Power Plants; 2) Nuclear Power Plant (NPP) records, containing technical details about NPPs; 3) Documents about operating experience, such as the Topical Operating Experience Reports (TOERs) and the quarterly reports on nuclear power plant events. The main objective of the information system is to develop communication, cooperation and sharing of operating experience amongst the national nuclear regulatory authorities participating in EU Clearinghouse network. The CH-OEF is essential for the preparation and dissemination of the quarterly reports on NPP events. These reports are published every three months and are intended to be complementary to other international reporting systems, containing mainly recent information publicly available. Only events that are considered to be likely to have lessons applicable to EU NPPs or with a real or potential impact on nuclear safety are addressed in the reports. The CH-OEF is a fundamental tool for their preparation, providing specific features for a more efficient sharing of information as well as for facilitating the related discussion and decision making. (author

  2. Review of the ATLAS experiment at the LHC (CERN)

    International Nuclear Information System (INIS)

    Taylor, G.

    1998-01-01

    Full text: This talk gives in overview of the physics program for the next generation high energy physics experiments at CERN's Large Hadron Collider (LHC). Emphasis will be on the ATLAS experiment and in particular on the Australian participation in that experiment. Australian physicists from Melbourne, Sydney and Wollongong are playing a significant role in the development, production, installation and operation of the ambitious Semiconductor Tracker (SCT) in the ATLAS' Inner Detector. The SCT, particularly important for the detection and measurement of high energy electrons, will be essential in the search for the Higgs Boson through electron decay channels (amongst other reactions). The design calls for a total detector surface area an order of magnitude larger than in current silicon detectors, in a harsh radiation environment. Prodigious data rates and high speed electronics add to the complications of this detector. The talk will review progress and describe the schedule for the completion of the SCT and ATLAS

  3. The experience of five years operation of Phenix

    International Nuclear Information System (INIS)

    Conte, F.; Lacroix, A.

    1980-01-01

    Two long periods of exceptional operation have satisfied the hopes of the designers and all parameters, power, efficiency, load factor, fuel behaviour, were better than was expected. The experience resulting from the only major incident provided a series of complementary data. Modern technology has need of sanction by experiment. The Phenix type reactor is a tool which is convenient to operate and to maintain. The two aspects of the demonstration, correct operation and ease of maintenance, take a concrete form in the harmlessness of Phenix on men and on the environment. There is no irradiation and few releases. (orig./DG)

  4. Nuclear power plant operation experience - a feedback programme

    International Nuclear Information System (INIS)

    Banica, I.; Sociu, F.; Margaritescu, C.

    1994-01-01

    An effective high quality maintenance programme is required for the safe reliable operation of a nuclear power plant. To achieve the objectives of such a programme, both plant management and staff must be highly dedicated and motivated to perform high quality work at all levels. Operating and maintenance experience data collections and analysis are necessary in order to enhance the safety of the plant and reliability of the structures systems and components throughout their operating life. Significant events, but also minor incident, may reveal important deficiencies or negative trends adverse to safety. Therefore, a computer processing system for collecting, classifying and evaluating abnormal events or findings concerning operating-maintenance and for feeding back the results of the lessons learned from experience into the design and the operation of our nuclear power plant is considered to be of paramount importance. (Author)

  5. Operating experience of natural circulation core cooling in boiling water reactors

    International Nuclear Information System (INIS)

    Kullberg, C.; Jones, K.; Heath, C.

    1993-01-01

    General Electric (GE) has proposed an advanced boiling water reactor, the Simplified Boiling Water Reactor (SBWR), which will utilize passive, gravity-driven safety systems for emergency core coolant injection. The SBWR design includes no recirculation loops or recirculation pumps. Therefore the SBWR will operate in a natural circulation (NC) mode at full power conditions. This design poses some concerns relative to stability during startup, shutdown, and at power conditions. As a consequence, the NRC has directed personnel at several national labs to help investigate SBWR stability issues. This paper will focus on some of the preliminary findings made at the INEL. Because of the broad range of stability issues this paper will mainly focus on potential geysering instabilities during startup. The two NC designs examined in detail are the US Humboldt Bay Unit 3 BWR-1 plant and Dodewaard plant in the Netherlands. The objective of this paper will be to review operating experience of these two plants and evaluate their relevance to planned SBWR operational procedures. For completeness, experimental work with early natural circulation GE test facilities will also be briefly discussed

  6. Activity of safety review for the facilities using nuclear material (2). Safety review results and maintenance experiences for hot laboratories

    International Nuclear Information System (INIS)

    Amagai, Tomio; Fujishima, Tadatsune; Mizukoshi, Yasutaka; Sakamoto, Naoki; Ohmori, Tsuyoshi

    2009-01-01

    In the site of O-arai Research and Development Center of Japan Atomic Energy Agency (JAEA), five hot laboratories for post-irradiation examination and development of plutonium fuels are operated more than 30 years. A safety review method for preventive maintenance on these hot laboratories includes test facilities and devices are established in 2003. After that, the safety review of these facilities and devices are done and taken the necessary maintenance based on the results in each year. In 2008, 372 test facilities and devices in these hot laboratories were checked and reviewed by this method. As a results of the safety review, repair issues of 38 facilities of above 372 facilities were resolved. This report shows the review results and maintenance experiences based on the results. (author)

  7. The ATLAS Tier-0: Overview and operational experience

    International Nuclear Information System (INIS)

    Elsing, Markus; Goossens, Luc; Nairz, Armin; Negri, Guido

    2010-01-01

    Within the ATLAS hierarchical, multi-tier computing infrastructure, the Tier-0 centre at CERN is mainly responsible for prompt processing of the raw data coming from the online DAQ system, to archive the raw and derived data on tape, to register the data with the relevant catalogues and to distribute them to the associated Tier-1 centers. The Tier-0 is already fully functional. It has been successfully participating in all cosmic and commissioning data taking since May 2007, and was ramped up to its foreseen full size, performance and throughput for the cosmic (and short single-beam) run periods between July and October 2008. Data and work flows for collision data taking were exercised in several 'Full Dress Rehearsals' (FDRs) in the course of 2008. The transition from an expert to a shifter-based system was successfully established in July 2008. This article will give an overview of the Tier-0 system, its data and work flows, and operations model. It will review the operational experience gained in cosmic, commissioning, and FDR exercises during the past year. And it will give an outlook on planned developments and the evolution of the system towards first collision data taking expected now in late Autumn 2009.

  8. The ATLAS Tier-0: Overview and operational experience

    Science.gov (United States)

    Elsing, Markus; Goossens, Luc; Nairz, Armin; Negri, Guido

    2010-04-01

    Within the ATLAS hierarchical, multi-tier computing infrastructure, the Tier-0 centre at CERN is mainly responsible for prompt processing of the raw data coming from the online DAQ system, to archive the raw and derived data on tape, to register the data with the relevant catalogues and to distribute them to the associated Tier-1 centers. The Tier-0 is already fully functional. It has been successfully participating in all cosmic and commissioning data taking since May 2007, and was ramped up to its foreseen full size, performance and throughput for the cosmic (and short single-beam) run periods between July and October 2008. Data and work flows for collision data taking were exercised in several "Full Dress Rehearsals" (FDRs) in the course of 2008. The transition from an expert to a shifter-based system was successfully established in July 2008. This article will give an overview of the Tier-0 system, its data and work flows, and operations model. It will review the operational experience gained in cosmic, commissioning, and FDR exercises during the past year. And it will give an outlook on planned developments and the evolution of the system towards first collision data taking expected now in late Autumn 2009.

  9. Telescience testbed: Operational support functions for biomedical experiments

    Science.gov (United States)

    Yamashita, Masamichi; Watanabe, Satoru; Shoji, Takatoshi; Clarke, Andrew H.; Suzuki, Hiroyuki; Yanagihara, Dai

    A telescience testbed was conducted to study the methodology of space biomedicine with simulated constraints imposed on space experiments. An experimental subject selected for this testbedding was an elaborate surgery of animals and electrophysiological measurements conducted by an operator onboard. The standing potential in the ampulla of the pigeon's semicircular canal was measured during gravitational and caloric stimulation. A principal investigator, isolated from the operation site, participated in the experiment interactively by telecommunication links. Reliability analysis was applied to the whole layers of experimentation, including design of experimental objectives and operational procedures. Engineering and technological aspects of telescience are discussed in terms of reliability to assure quality of science. Feasibility of robotics was examined for supportive functions to reduce the workload of the onboard operator.

  10. LOFT instrumented fuel design and operating experience

    International Nuclear Information System (INIS)

    Russell, M.L.

    1979-01-01

    A summary description of the Loss-of-Fluid Test (LOFT) system instrumented core construction details and operating experience through reactor startup and loss-of-coolant experiment (LOCE) operations performed to date are discussed. The discussion includes details of the test instrumentation attachment to the fuel assembly, the structural response of the fuel modules to the forces generated by a double-ended break of a pressurized water reactor (PWR) coolant pipe at the inlet to the reactor vessel, the durability of the LOFT fuel and test instrumentation, and the plans for incorporation of improved fuel assembly test instrumentation features in the LOFT core

  11. Nuclear power plant operating experience, 1976

    International Nuclear Information System (INIS)

    1977-11-01

    This report is the third in a series of reports issued annually that summarize the operating experience of U.S. nuclear power plants in commercial operation. Power generation statistics, plant outages, reportable occurrences, fuel element performance, occupational radiation exposure and radioactive effluents for each plant are presented. Summary highlights of these areas are discussed. The report includes 1976 data from 55 plants--23 boiling water reactor plants and 32 pressurized water reactor plants

  12. Peer Review: Promoting Efficient School District Operations

    Science.gov (United States)

    Hale, Jason S.

    2010-01-01

    Many professions recognize the benefits of peer reviews to assess processes and operations because peers can more easily identify one another's inefficiencies and provide some kind of intervention. Generally, the goal of the peer review process is to verify whether the work satisfies the standards set by the industry. A number of states have begun…

  13. Efeito do tempo de experiência de operadores de Harvester no rendimento operacional Effect of time experience of Harvester operators in operating yield

    Directory of Open Access Journals (Sweden)

    Elaine Cristina Leonello

    2012-12-01

    Full Text Available A mecanização da colheita de madeira permite maior controle dos custos e pode proporcionar reduções em prazos relativamente curtos. Além disso, tem um lugar de destaque na humanização do trabalho florestal e no aumento do rendimento operacional. O presente trabalho teve por objetivo avaliar o desempenho de operadores de harvester em função do tempo de experiência na atividade. Foram avaliados oito operadores do sexo masculino, com idade entre 23 e 46 anos. O estudo consistiu na análise do volume de madeira colhida pelo harvester. O tempo de experiência afeta significativamente o rendimento operacional dos operadores de harvester. Tal rendimento aumenta expressivamente nos primeiros 18 meses de experiência, mantendo-se em ascensão nos próximos 26 meses. Após os 44 meses de experiência, o rendimento dos operadores tende a reduzir, revelando as possíveis acomodações do cotidiano. Tais resultados permitem concluir que por volta dos 50 meses de experiência na atividade de operação de harvester, se faz necessária a adoção de medidas de reciclagem, motivação, entre outras, a fim de proporcionar aos operadores melhores condições de trabalho que os possibilitem continuar exercendo a atividade de forma eficiente e rentável à empresa.The mechanization of timber harvesting allows greater control of costs and can provide reductions in relatively short intervals. Moreover, it has a place in the humanization of the working forest and the increase in performance. This work provides comparisons of operating performance of different operator harvester according to the time of experience in the activity. The operators evaluated were eight males, aged between 23 and 46 years old. The study consisted of analysis of the volume of timber harvested by the harvester. The experience significantly affects the performance of harvesters operators. The performance increases significantly in the first 18 months of experience, and it remained on

  14. 14th Biennial conference on reactor operating experience plant operations: The human element

    International Nuclear Information System (INIS)

    Anon.

    1989-01-01

    Separate abstracts were prepared for the papers presented in the following areas of interest: enhancing operator performance; structured approaches to maintenance standards and reliability-centered maintenance; human issues in plant operations and management; test, research, and training reactor utilization; methods and applications of root-cause analysis; emergency operating procedure enhancement programs; test, research, and training reactor upgrades; valve maintenance and diagnostics; recent operating experiences; and current maintenance issues

  15. US nuclear power plant operating cost and experience summaries

    International Nuclear Information System (INIS)

    Kohn, W.E.; Reid, R.L.; White, V.S.

    1998-02-01

    NUREG/CR-6577, U.S. Nuclear Power Plant Operating Cost and Experience Summaries, has been prepared to provide historical operating cost and experience information on U.S. commercial nuclear power plants. Cost incurred after initial construction are characterized as annual production costs, representing fuel and plant operating and maintenance expenses, and capital expenditures related to facility additions/modifications which are included in the plant capital asset base. As discussed in the report, annual data for these two cost categories were obtained from publicly available reports and must be accepted as having different degrees of accuracy and completeness. Treatment of inconclusive and incomplete data is discussed. As an aid to understanding the fluctuations in the cost histories, operating summaries for each nuclear unit are provided. The intent of these summaries is to identify important operating events; refueling, major maintenance, and other significant outages; operating milestones; and significant licensing or enforcement actions. Information used in the summaries is condensed from annual operating reports submitted by the licensees, plant histories contained in Nuclear Power Experience, trade press articles, and the Nuclear Regulatory Commission (NRC) web site (www.nrc.gov)

  16. US nuclear power plant operating cost and experience summaries

    Energy Technology Data Exchange (ETDEWEB)

    Kohn, W.E.; Reid, R.L.; White, V.S.

    1998-02-01

    NUREG/CR-6577, U.S. Nuclear Power Plant Operating Cost and Experience Summaries, has been prepared to provide historical operating cost and experience information on U.S. commercial nuclear power plants. Cost incurred after initial construction are characterized as annual production costs, representing fuel and plant operating and maintenance expenses, and capital expenditures related to facility additions/modifications which are included in the plant capital asset base. As discussed in the report, annual data for these two cost categories were obtained from publicly available reports and must be accepted as having different degrees of accuracy and completeness. Treatment of inconclusive and incomplete data is discussed. As an aid to understanding the fluctuations in the cost histories, operating summaries for each nuclear unit are provided. The intent of these summaries is to identify important operating events; refueling, major maintenance, and other significant outages; operating milestones; and significant licensing or enforcement actions. Information used in the summaries is condensed from annual operating reports submitted by the licensees, plant histories contained in Nuclear Power Experience, trade press articles, and the Nuclear Regulatory Commission (NRC) web site (www.nrc.gov).

  17. European Clearinghouse for Nuclear Power Plants Operational Experience Feedback

    International Nuclear Information System (INIS)

    Martin Ramos, M.; Noel, M.

    2010-01-01

    In the European Union, in order to support the Community activities on operational experience, a centralized regional network on nuclear power plants operational experience feedback (European Clearinghouse on Operational Experience Feedback for Nuclear Power Plants) was established in 2008 at the EC JRC-IE, Petten (The Netherlands) on request of nuclear Safety Authorities of several Member States. Its main goal is to improve the communication and information sharing on OEF, to promote regional collaboration on analyses of operational experience and dissemination of the lessons learned. The enlarged EU Clearinghouse was launched in April 2010, and it is currently gathering the Regulatory Authorities of Finland, Hungary, Lithuania, the Netherlands, Romania, Slovenia, Switzerland, Bulgaria, Czec Republic, France, Germany, Slovak Republic, and Spain (these last six countries as observers). The OECD Nuclear Energy Agency, the IAEA, the EC Directorates General of the JRC and ENER are also part of the network. Recently, collaboration between some European Technical Support Organizations (such IRSN and GRS) and the EU Clearinghouse has been initiated. This paper explains in detail the objectives and organization of the EU Clearinghouse, as well as the most relevant activities carried out, like research work in trend analysis of events ocurred in NPP, topical reports on particular events, dissemination of the results, quarterly reports on events reported publicly and operational experience support to the members of the EU Clearinghouse. (Author)

  18. Fort Saint Vrain operational experience

    International Nuclear Information System (INIS)

    Fuller, C.H.

    1989-01-01

    Fort St. Vrain (FSV), on the system of the Public Service Company of Colorado, is the only high temperature gas-cooled (HTGR) power reactor in the United States. The plant features a helium-cooled reactor with a uranium-thorium fuel cycle. The paper describes the experience made during its operation. (author). 2 refs, 4 figs, 2 tabs

  19. Comparing PRAs with operating experience

    International Nuclear Information System (INIS)

    Picard, R.R.; Martz, H.F.

    1998-01-01

    Probabilistic Risk Assessment is widely used to estimate the frequencies of rare events, such as nuclear power plant accidents. An obvious question concerns the extent to which PRAs conform to operating experience--that is, do PRAs agree with reality? The authors discuss a formal methodology to address this issue and examine its performance using plant-specific data

  20. Operating Experience of MACSTOR Modules at CANDU 6 Stations

    International Nuclear Information System (INIS)

    Beaudoin, Robert R.

    2005-01-01

    Over the last three decades, Atomic Energy of Canada Limited (AECL) has contributed to the technology development and implementation of dry spent fuel management facilities in Canada, Korea and Romania During that period, AECL has developed a number of concrete canister models and the MACSTOR200 module, a medium size air-cooled vault with a 228 MgU (Mega grams of Uranium) capacity. AECL's dry storage technologies were used for the construction of eight large-scale above ground dry storage facilities for CANDU spent fuel. As of 2005, those facilities have an installed capacity in excess of 5,000 MgU. Since 1995, the two newest dry storage installations built for CANDU 6 reactors at Gentilly 2 (Canada) and Cernavoda (Romania) used the MACSTOR 200 module. Seven such modules have been built at Gentilly 2 during the 1995 to 2004 period and one at Cernavoda in 2003. The construction and operating experience of those modules is reviewed in this paper. The MACSTOR 200 modules were initially designed for a 50-year service life, with recent units at Gentilly 2 licensed for a 100-year service life in a rural (non-maritime) climate. During the 1995-2005 period, six of the eight modules were loaded with fuel. Their operation has brought a significant amount of experience on loading operations, performance of fuel handling equipment, radiation shielding, heat transfer, monitoring of the two confinement boundaries and radiation dose to personnel. Heat dissipation performance of the MACSTOR 200 was initially licensed using values derived from full scale tests made at AECL's Whiteshell Research Laboratories, that were backed-up by temperature measurements made on the first two modules. Results and computer models developed for the MACSTOR 200 module are described. Korea Hydro and Nuclear Power (KHNP) and its subsidiary Nuclear Environment Technology Institute (NETEC), in collaboration with Hyundai Engineering Company Ltd. (HEC) and AECL, are developing a new dry storage module to

  1. OSART Guidelines. 2015 Edition. Reference Report for IAEA Operational Safety Review Teams (OSARTs)

    International Nuclear Information System (INIS)

    2016-01-01

    The IAEA works to provide a global nuclear safety and security framework for the protection of people and the environment from the effects of ionizing radiation, the minimization of the likelihood of accidents that could endanger life and property, and effective mitigation of the effects of any such events, should they occur. The strategic approach to achieving such a framework involves continual improvement in four areas: national and international safety infrastructures; the establishment and global acceptance of IAEA safety standards; an integrated approach to the provision for the application of the safety standards; and a global network of knowledge and experience. The IAEA Operational Safety Review Team (OSART) programme provides advice and assistance to Member States to enhance the safety of nuclear power plants during commissioning and operation. The OSART programme, initiated in 1982, is available to all Member States with nuclear power plants under commissioning or in operation. Conservative design, careful manufacture and sound construction are all prerequisites for the safe operation of nuclear power plants. However, the safety of the plant also depends ultimately on: sound management, policies, procedures, processes and practices; the capability and reliability of commissioning and operating personnel; comprehensive instructions; sound accident management and emergency preparedness; and adequate resources. Finally, a positive attitude and conscientiousness on the part of all staff in discharging their responsibilities is important to safety. The OSART programme is based on the safety standards applicable to nuclear power plants. IAEA safety standards reflect the consensus of Member States on nuclear safety matters. The reports of the International Nuclear Safety Group identify important current nuclear safety issues and also serve as references during an OSART review. The publication OSART Guidelines provides overall guidance on the conduct of OSART

  2. Decentralization of operating reactor licensing reviews: NRR Pilot Program

    International Nuclear Information System (INIS)

    Hannon, J.N.

    1984-07-01

    This report, which has incorporated comments received from the Commission and ACRS, describes the program for decentralization of selected operating reactor licensing technical review activities. The 2-year pilot program will be reviewed to verify that safety is enhanced as anticipated by the incorporation of prescribed management techniques and application of resources. If the program fails to operate as designed, it will be terminated

  3. 7 CFR 3415.10 - Establishment and operation of peer review groups.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Establishment and operation of peer review groups... ASSESSMENT RESEARCH GRANTS PROGRAM Scientific Peer Review of Research Grant Applications § 3415.10 Establishment and operation of peer review groups. Subject to § 3415.5, the Administrator shall adopt procedures...

  4. 7 CFR 3400.10 - Establishment and operation of peer review groups.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Establishment and operation of peer review groups... GRANTS PROGRAM Scientific Peer Review of Research Grant Applications § 3400.10 Establishment and operation of peer review groups. Subject to § 3400.5, the Administrator will adopt procedures for the...

  5. 7 CFR 3401.12 - Establishment and operation of peer review groups.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Establishment and operation of peer review groups... GRANTS PROGRAM Scientific Peer Review of Research Applications for Funding § 3401.12 Establishment and operation of peer review groups. Subject to § 3401.7, the Administrator will adopt procedures for the...

  6. 7 CFR 3411.10 - Establishment and operation of peer review groups.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Establishment and operation of peer review groups... INITIATIVE COMPETITIVE GRANTS PROGRAM Scientific Peer Review of Research Grant Applications § 3411.10 Establishment and operation of peer review groups. Subject to § 3411.5, the Administrator shall adopt procedures...

  7. Operational safety improvement in OPR 1000

    International Nuclear Information System (INIS)

    Jung, Y.-E.

    2005-01-01

    Nuclear power operating experience management might be an important factor for the operational safety improvement. KHNP's nuclear information management system, called KONIS receives, distributes and manages all nuclear information from domestic and foreign, especially operating experience. Ulchin 3 and 4, the first units of OPR 1000 series operates several organizations regarding management of operating experience e.g. specialist group program, various task forces, equipment specialist system for operator, etc. Peer review is another contribution for nuclear safety. (author)

  8. Limitations of the inspection and testing concepts for pressurised components from the viewpoint of operating experience

    International Nuclear Information System (INIS)

    Schulz, H.

    2001-01-01

    The role of in-service inspection and testing is to contribute to a safe and reliable operation of systems, structures and components. It is therefore the objective of inspections and tests to identify malfunctions and degradations at a stage early enough to avoid detrimental impacts on safety as well as on the reliability of the plant. Taking mostly the pressure boundary of German light-water reactors as an example, it is the intention of this paper to analyse how successful present inspection and testing requirements are and to discuss limitations. Based on a review of the world-wide operating experience the following questions of a more generic nature are addressed: - Are the relevant damage mechanisms being addressed in our codes and standards? - What are the criteria to develop a representative scope of inspection? - How to maintain a sufficient level of information for a decreasing number of nuclear power plants in operation? It can be concluded that the revision of codes and standards according to lessons learned from operating experience remains as an ongoing process. Furthermore, the criteria applied to derive a representative scope of inspection need to be addressed in more detail, specifically with respect to corrosion. The continuous evaluation of operating experience of a large number of plants is the most valuable source to identify beginning degradations. (author)

  9. Review of operating room ventilation standards

    NARCIS (Netherlands)

    Melhado, M.D.A.; Hensen, J.L.M.; Loomans, M.G.L.C.

    2006-01-01

    This article reviews standards applied to operating room ventilation design used by European, South and North American countries. Required environmental parameters are compared with regard to type of surgery, and ventilation system. These requirements as well as their relation to infection control

  10. Operational Readiness Review Final Report for K Basin Fuel Transfer System

    International Nuclear Information System (INIS)

    DAVIES, T.H.

    2002-01-01

    An Operational Readiness Review (ORR) was conducted by the U.S. Department of Energy (DOE), Richland Operations Office (RL) to verify that an adequate state of readiness had been achieved for startup of the K Basin Fuel Transfer System (FTS). The DOE ORR was conducted during the period November 6-18, 2002. The DOE ORR team concluded that the K Basin Fuel Transfer System is ready to start operations, subject to completion and verification of identified pre-start findings. The ORR was conducted in accordance with the Spent Nuclear Fuel (SNF) K Basin Fuel Transfer System (FTS) Operational Readiness Review (ORR) Plan of Action and the Operational Readiness Review Implementation Plan for K Basin Fuel Transfer System. Review activities consisted of staff interviews, procedure and document reviews, and observations of normal facility operations, operational upset conditions, and an emergency drill. The DOE ORR Team also reviewed and assessed the adequacy of the contractor ORR3 and the RL line management review. The team concurred with the findings and observations identified in these two reports. The DOE ORR for the FTS evaluated the contractor under single-shift operations. Of concern to the ORR Team was that SNF Project management intended to change from a single-shift FTS operation to a two-shift operation shortly after the completion of the DOE ORR. The ORR team did not assess two-shift FTS operations and the ability of the contractor to conduct a smooth transition from shift to shift. However, the DOE ORR team did observe an operational upset drill that was conducted during day shift and carried over into swing shift; during this drill, swing shift was staffed with fewer personnel as would be expected for two-shift operations. The facility was able to adequately respond to the event with the reduced level of staff. The ORR Team was also able to observe a Shift Manager turnover meeting when one shift manager had to be relieved during the middle of the day. The ORR

  11. Operation experience of the Indonesian multipurpose research reactor RSG-GAS

    Energy Technology Data Exchange (ETDEWEB)

    Hastowo, Hudi; Tarigan, Alim [Multipurpose Reactor Center, National Nuclear Energy Agency of the Republic of Indonesia (PRSG-BATAN), Kawasan PUSPIPTEK Serpong, Tangerang (Indonesia)

    1999-08-01

    RSG-GAS is a multipurpose research reactor with nominal power of 30 MW, operated by BATAN since 1987. The reactor is an open pool type, cooled and moderated with light water, using the LEU-MTR fuel element in the form of U{sub 3}O{sub 8}-Al dispersion. Up to know, the reactor have been operated around 30,000 hours to serve the user. The reactor have been utilized to produce radioisotope, neutron beam experiments, irradiation of fuel element and its structural material, and reactor physics experiments. This report will explain in further detail concerning operational experience of this reactor, i.e. reactor operation data, reactor utilization, research program, technical problems and it solutions, plant modification and improvement, and development plan to enhance better reactor operation performance and its utilization. (author)

  12. Operation experience of the Indonesian multipurpose research reactor RSG-GAS

    International Nuclear Information System (INIS)

    Hastowo, Hudi; Tarigan, Alim

    1999-01-01

    RSG-GAS is a multipurpose research reactor with nominal power of 30 MW, operated by BATAN since 1987. The reactor is an open pool type, cooled and moderated with light water, using the LEU-MTR fuel element in the form of U 3 O 8 -Al dispersion. Up to know, the reactor have been operated around 30,000 hours to serve the user. The reactor have been utilized to produce radioisotope, neutron beam experiments, irradiation of fuel element and its structural material, and reactor physics experiments. This report will explain in further detail concerning operational experience of this reactor, i.e. reactor operation data, reactor utilization, research program, technical problems and it solutions, plant modification and improvement, and development plan to enhance better reactor operation performance and its utilization. (author)

  13. Operational experience with CMS Tier-2 sites

    International Nuclear Information System (INIS)

    Gonzalez Caballero, I

    2010-01-01

    In the CMS computing model, more than one third of the computing resources are located at Tier-2 sites, which are distributed across the countries in the collaboration. These sites are the primary platform for user analyses; they host datasets that are created at Tier-1 sites, and users from all CMS institutes submit analysis jobs that run on those data through grid interfaces. They are also the primary resource for the production of large simulation samples for general use in the experiment. As a result, Tier-2 sites have an interesting mix of organized experiment-controlled activities and chaotic user-controlled activities. CMS currently operates about 40 Tier-2 sites in 22 countries, making the sites a far-flung computational and social network. We describe our operational experience with the sites, touching on our achievements, the lessons learned, and the challenges for the future.

  14. How operational issues impact science peer review

    Science.gov (United States)

    Blacker, Brett S.; Golombek, Daniel; Macchetto, Duccio

    2006-06-01

    In some eyes, the Phase I proposal selection process is the most important activity handled by the Space Telescope Science Institute (STScI). Proposing for HST and other missions consists of requesting observing time and/or archival research funding. This step is called Phase I, where the scientific merit of a proposal is considered by a community based peer-review process. Accepted proposals then proceed thru Phase II, where the observations are specified in sufficient detail to enable scheduling on the telescope. Each cycle the Hubble Space Telescope (HST) Telescope Allocation Committee (TAC) reviews proposals and awards observing time that is valued at $0.5B, when the total expenditures for HST over its lifetime are figured on an annual basis. This is in fact a very important endeavor that we continue to fine-tune and tweak. This process is open to the science community and we constantly receive comments and praise for this process. In this last year we have had to deal with the loss of the Space Telescope Imaging Spectrograph (STIS) and move from 3-gyro operations to 2-gyro operations. This paper will outline how operational issues impact the HST science peer review process. We will discuss the process that was used to recover from the loss of the STIS instrument and how we dealt with the loss of 1/3 of the current science observations. We will also discuss the issues relating to 3-gyro vs. 2-gyro operations and how that changes impacted Proposers, our in-house processing and the TAC.

  15. Post-operative telephone review is cost-effective and acceptable to patients.

    LENUS (Irish Health Repository)

    Gray, R T

    2012-02-01

    INTRODUCTION: Patients undergoing selective minor emergency and elective procedures are followed up by a nurse-led structured telephone review six weeks post-operatively in our hospital. Our study objectives were to review patients\\' satisfaction, assess cost-effectiveness and compare our practice with other surgical units in Northern Ireland (NI). PATIENTS AND METHODS: Completed telephone follow-up forms were reviewed retrospectively for a three-year period and cost savings calculated. Fifty patients were contacted prospectively by telephone using a questionnaire to assess satisfaction of this follow-up. A postal questionnaire was sent to 68 general and vascular surgeons in NI, assessing individual preferences for patient follow-up. RESULTS: A total of 1378 patients received a telephone review from September 2005 to September 2008. One thousand one hundred and seventy-seven (85.4%) were successfully contacted, while 201 (14.6%) did not respond despite multiple attempts. One hundred and forty-seven respondents (10.7%) required further outpatient follow-up, thereby saving 1231 outpatient reviews, equivalent to pound41,509 per annum. Thirty-nine (78%) patients expected post-operative follow-up, with 29 (58%) expecting this in the outpatient department. However, all patients were satisfied with the nurse-led telephone review. Fifty-three (78%) consultants responded. Those who always, or occasionally, review patients post-operatively varies according to the operation performed, ranging from 2.2% appendicectomy patients to 40.0% for varicose vein surgery. CONCLUSION: Current practice in NI varies, but a significant proportion of patients are not routinely reviewed. This study confirmed that patients expect post-operative follow-up. A nurse-led telephone review service is acceptable to patients, cost-effective and reduces the number of unnecessary outpatient reviews.

  16. Operational safety experience feedback by means of unusual event reports

    International Nuclear Information System (INIS)

    1996-07-01

    Operational experience of nuclear power plants can be used to great advantage to enhance safety performance provided adequate measures are in place to collect and analyse it and to ensure that the conclusions drawn are acted upon. Feedback of operating experience is thus an extremely important tool to ensure high standards of safety in operational nuclear power plants and to improve the capability to prevent serious accidents and to learn from minor deviations and equipment failures - which can serve as early warnings -to prevent even minor events from occurring. Mechanisms also need to be developed to ensure that operating experience is shared both nationally as well as internationally. The operating experience feedback process needs to be fully and effectively established within the nuclear power plant, the utility, the regulatory organization as well as in other institutions such as technical support organizations and designers. The main purpose of this publication is to reflect the international consensus as to the general principles and practices in the operational safety experience feedback process. The examples of national practices for the whole or for particular parts of the process are given in annexes. The publication complements the IAEA Safety Series No.93 ''Systems for Reporting Unusual Events in Nuclear Power Plants'' (1989) and may also give a general guidance for Member States in fulfilling their obligations stipulated in the Nuclear Safety Convention. Figs, tabs

  17. Operational safety experience feedback by means of unusual event reports

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-07-01

    Operational experience of nuclear power plants can be used to great advantage to enhance safety performance provided adequate measures are in place to collect and analyse it and to ensure that the conclusions drawn are acted upon. Feedback of operating experience is thus an extremely important tool to ensure high standards of safety in operational nuclear power plants and to improve the capability to prevent serious accidents and to learn from minor deviations and equipment failures - which can serve as early warnings -to prevent even minor events from occurring. Mechanisms also need to be developed to ensure that operating experience is shared both nationally as well as internationally. The operating experience feedback process needs to be fully and effectively established within the nuclear power plant, the utility, the regulatory organization as well as in other institutions such as technical support organizations and designers. The main purpose of this publication is to reflect the international consensus as to the general principles and practices in the operational safety experience feedback process. The examples of national practices for the whole or for particular parts of the process are given in annexes. The publication complements the IAEA Safety Series No.93 ``Systems for Reporting Unusual Events in Nuclear Power Plants`` (1989) and may also give a general guidance for Member States in fulfilling their obligations stipulated in the Nuclear Safety Convention. Figs, tabs.

  18. Operation experience with elevated ammonia

    International Nuclear Information System (INIS)

    Vankova, Katerina; Kysela, Jan; Malac, Miroslav; Petrecky, Igor; Svarc, Vladimir

    2011-01-01

    The 10 VVER units in the Czech and Slovak Republics are all in very good water chemistry and radiation condition, yet questions have arisen regarding the optimization of cycle chemistry and improved operation in these units. To address these issues, a comprehensive experimental program for different water chemistries of the primary circuit was carried out at the Rez Nuclear Research Institute, Czech Republic, with the goal of judging the influence of various water chemistries on radiation build-up. Four types of water chemistries were compared: standard VVER water chemistry (in common use), direct hydrogen dosing without ammonia, standard VVER water chemistry with elevated ammonia levels, and zinc dosing to standard VVER water chemistry. The test results showed that the types of water chemistry other than the common one have benefits for the operation of the nuclear power plant (NPP) primary circuit. Operation experience with elevated ammonia at NPP Dukovany Units 3 and 4 is presented which validates the experimental results, demonstrating improved corrosion product volume activity. (orig.)

  19. A boiling-water reactor concept for low radiation exposure based on operating experience

    International Nuclear Information System (INIS)

    Koine, Y.; Uchida, S.; Izumiya, M.; Miki, M.

    1983-01-01

    A review of boiling-water reactor (BWR) operating experience indicates the significant role of water chemistry in determining the radiation dose rate contributing to occupational exposure. The major contributor among the radioactive species involved is identified as 60 Co, produced by neutron activation of 59 Co originating from structural materials. Iron crud, a fine solid form of corrosion product in the reactor water, is also shown to enhance the radiation dose rate. A theoretical study, supported by the operating experience and an extensive confirmatory test, led to the computerized analytical model called DR CRUD which is capable of predicting long-term radiation dose buildup. It accounts for the mechanism of radiation buildup through corrosion products such as irons, cobalts and other radioactive elements; their generation, transport, activation, interaction and deposition in the reactor coolant system are simulated. A scoping analysis, using this model as a tool, establishes the base line of the BWR concept for low occupational exposure. The base line consists of a set of target values for an annual exposure of 200 man.rem in an 1100 MW(e) BWR unit. They are the parameters that will be built into the design such as iron and cobalt inputs to the reactor water, and the capability of the reactor and the condensate purification system. Applicable means of technology are identified to meet the targets, ranging from improved water chemistry to the purification technique, optimized material selection and the recommended operational procedure. Extensive test programmes provide specifications of these means for use in BWRs. Combinations of their application are reviewed to define the concept of reduced exposure. Analytical study verifies the effectiveness of the proposed BWR concept in achieving a low radiation dose rate; occupational exposure is reduced to 200 man.rem/a. (author)

  20. Applicability of Learning From Experience to Sellafield Post-Operation Clean Out and Decommissioning Programmes

    International Nuclear Information System (INIS)

    Ytournel, Bertrand; Clement, Gilles; Macpherson, Ian; Dunlop, Alister

    2016-01-01

    Nuclear cycle facilities, such as recycling plants, over the world differ in their design and operation history. Transferability of Learning From Experience (LFE), Best Practices and Decommissioning tools and techniques may not appear as relevant as it would be for a fleet of reactors. Moreover Regulatory, Economic and Social Drivers may differ from one country to another. Technical Drivers being comparable, AREVA and Sellafield Ltd (SL) have conducted various benchmarks and technical peer reviews to consider LFE from AREVA's Post-Operation Clean Out (POCO) and Decommissioning projects (such as UP2-400 on the La Hague site) and those performed for customers (such as CEA's UP1 on the Marcoule site). The intention is that Sellafield can benefit from AREVA experience and incorporate some recommendations in their own programmes. These reviews highlighted not only that investigation tools and methods as well as Decommissioning techniques are fully transferable, but also that strategic, technical and organizational key recommendations are applicable. 1. End-state definition (for each programme step) has a strong impact on POCO and Decommissioning scenarios. 2. A waste-driven strategy is essential for the overall programme cost and schedule management, and it avoids detrimental activities and short-term decisions made under pressure that may have negative impacts on the Programme. 3. Safety issues associated with POCO and decommissioning programmes are different from the commercial operations environment. 4. An extensive characterization plan (with physical and radiological surveys and active sampling) is essential to underpin the final POCO / decommissioning scenario and build a plant configuration baseline that will be updated as the decommissioning progresses. 5. Transition from operations to decommissioning requires a major change in culture; the organization must adapt to the new decommissioning environment. 6. Securing specific competencies, resources and

  1. Human-centred automation programme: review of experiment related studies

    International Nuclear Information System (INIS)

    Grimstad, Tone; Andresen, Gisle; Skjerve, Ann Britt Miberg

    2000-04-01

    Twenty-three empirical studies concerning automation and performance have been reviewed. The purposes of the review are to support experimental studies in the Human-Centred Automation (HCA) programme and to develop a general theory on HCA. Each study was reviewed with regard to twelve study characteristics: domain, type of study, purpose, definition of automation, variables, theoretical basis, models of operator performance, methods applied, experimental design, outcome, stated scope of results, strengths and limitations. Seven of the studies involved domain experts, the rest used students as participants. The majority of the articles originated from the aviation domain: only the study conducted in HAMMLAB considered process control in power plants. In the experimental studies, the independent variable was level of automation, or reliability of automation, while the most common dependent variables were workload, situation awareness, complacency, trust, and criteria of performance, e.g., number of correct responses or response time. Although the studies highlight important aspects of human-automation interaction, it is still unclear how system performance is affected. Nevertheless, the fact that many factors seem to be involved is taken as support for the system-oriented approach of the HCA programme. In conclusion, the review provides valuable input both to the design of experiments and to the development of a general theory. (Author). refs

  2. Experience in operation of heavy water reactors

    International Nuclear Information System (INIS)

    Rotaru, Ion; Bilegan, Iosif; Ghitescu, Petre

    1999-01-01

    The paper presents the main topics of the CANDU owners group (COG) meeting held in Mangalia, Romania on 7-10 September 1998. These meetings are part of the IAEA program for exchange of information related mainly to CANDU reactor operation safety. The first meeting for PHWR reactors took place in Vienna in 1989, followed by those in Argentina (1991), India (1994) and Korea (1996). The topics discussed at the meeting in Romania were: operation experience and recent major events, performances of CANDU reactors and safe operation, nuclear safety and operation procedures of PHWR, programs and strategies of lifetime management of installations and components of NPPs, developments and updates

  3. Power ramping/cycling experience and operational recommendations in KWU power plants

    International Nuclear Information System (INIS)

    Jan, R. von; Wunderlich, F.; Holzer, R.

    1980-01-01

    The power cycling and ramping experience of KWU is based on experiments in test and commercial reactors, and on evaluation of plant operation (PHWR, PWR and BWR). Power cycling of fuel rods have never lead to PCI failures. In ramping experiments, for fast ramps PCI failure thresholds of 480/420 W/cm are obtained at 12/23 GWd/t(U) burn-up for pressurized PWR fuel. No failures occurred during limited exceedance of the threshold with reduced ramp rate. Operational recommendations used by KWU are derived from experiments and plant experience. The effects of ramping considerations on plant operation is discussed. No rate restrictions are required for start-ups during an operating cycle or load follow operation within set limits for the distortion of the local power distribution. In a few situations, e.g. start-up after refueling, ramp rates of 1 to 5 %/h are recommended depending on plant and fuel design

  4. Operating procedures: Fusion Experiments Analysis Facility

    Energy Technology Data Exchange (ETDEWEB)

    Lerche, R.A.; Carey, R.W.

    1984-03-20

    The Fusion Experiments Analysis Facility (FEAF) is a computer facility based on a DEC VAX 11/780 computer. It became operational in late 1982. At that time two manuals were written to aid users and staff in their interactions with the facility. This manual is designed as a reference to assist the FEAF staff in carrying out their responsibilities. It is meant to supplement equipment and software manuals supplied by the vendors. Also this manual provides the FEAF staff with a set of consistent, written guidelines for the daily operation of the facility.

  5. Operating procedures: Fusion Experiments Analysis Facility

    International Nuclear Information System (INIS)

    Lerche, R.A.; Carey, R.W.

    1984-01-01

    The Fusion Experiments Analysis Facility (FEAF) is a computer facility based on a DEC VAX 11/780 computer. It became operational in late 1982. At that time two manuals were written to aid users and staff in their interactions with the facility. This manual is designed as a reference to assist the FEAF staff in carrying out their responsibilities. It is meant to supplement equipment and software manuals supplied by the vendors. Also this manual provides the FEAF staff with a set of consistent, written guidelines for the daily operation of the facility

  6. Review of experiments for research reactors - approved 1974

    International Nuclear Information System (INIS)

    Anon.

    1977-01-01

    This standard establishes guidelines for the review and approval of experiments performed at research reactor facilities. This standard identifies the major areas that shall be reviewed for each experiment to ensure that it (a) falls within the limits delineated in the technical specifications, (b) does not present an unreviewed safety question as defined in 10 CFR Section 50.59 π2-, (c) does not constitute a threat to the health and safety of any individual or group of individuals, and (d) does not constitute a hazard to the reactor facility or other equipment. In addition, this standard recommends a system for classifying experiments to establish levels of review and approval commensurate with the level of risk inherent in the experiment

  7. The work of the Operational Safety Review Team (OSART)

    International Nuclear Information System (INIS)

    Hide, K.W.

    1996-01-01

    The Operational Safety Review Team (OSART) programme was set up by the IAEA in 1982 to assist Member States to enhance the operational safety of nuclear power plants. Each team is staffed by senior experts in the relevant fields. The review team discusses with plant staff the existing operational programmes for plant which may be under construction, being commissioned or already operating. Following a detailed examination of a safety programme, the OSART team lists strengths and weaknesses and makes recommendations on how to overcome the latter. Since their conclusions are based on the best prevailing international practice, they may be more stringent than those based on national criteria. The results of the 77 missions conducted at 62 plants in 28 countries by the end of 1994 are summarised. (UK)

  8. LMFBR operational safety: the EBR-II experience

    International Nuclear Information System (INIS)

    Sackett, J.I.; Allen, N.L.; Dean, E.M.; Fryer, R.M.; Larson, H.A.; Lehto, W.K.

    1978-01-01

    The mission of the Experimental Breeder Reactor II (EBR-II) has evolved from that of a small LMFBR demonstration plant to a major irradiation-test facility. Because of that evolution, many operational-safety issues have been encountered. The paper describes the EBR-II operational-safety experience in four areas: protection-system design, safety-document preparation, tests of off-normal reactor conditions, and tests of elements with breached cladding

  9. The SM and MIR reactors operation experience

    International Nuclear Information System (INIS)

    Kuprienko, V.A.; Klinov, A.V.; Svyatkin, M.N.; Shamardin, V.K.

    1995-01-01

    The SM and MIR operation experience show that continuous work on the problem of ageing, in all its aspects, allows for prolongation of the research plant life cycle by several folds as compared to the initial project. The redesigned SM-3 reactor will operate for another 20 years. The similar result is expected from the MIR planned reconstruction which scope will be the topic of future presentations. (orig.)

  10. early experience of operative treatment of pelvic and acetabular

    African Journals Online (AJOL)

    Objective: To review early post-operative results of pelvic and acetabular fracture intern al fixation. Design: ... 600 needing operative treatment annually. ... Infection was controlled with debridement and antibiotics. All the patients in the study returned to their work except one who has yet to do so 5 months after his injury.

  11. A review of the Z2-FET 1T-DRAM memory: Operation mechanisms and key parameters

    Science.gov (United States)

    Cristoloveanu, S.; Lee, K. H.; Parihar, M. S.; El Dirani, H.; Lacord, J.; Martinie, S.; Le Royer, C.; Barbe, J.-Ch.; Mescot, X.; Fonteneau, P.; Galy, Ph.; Gamiz, F.; Navarro, C.; Cheng, B.; Duan, M.; Adamu-Lema, F.; Asenov, A.; Taur, Y.; Xu, Y.; Kim, Y.-T.; Wan, J.; Bawedin, M.

    2018-05-01

    The band-modulation and sharp-switching mechanisms in Z2-FET device operated as a capacitorless 1T-DRAM memory are reviewed. The main parameters that govern the memory performance are discussed based on detailed experiments and simulations. This 1T-DRAM memory does not suffer from super-coupling effect and can be integrated in sub-10 nm thick SOI films. It offers low leakage current, high current margin, long retention, low operating voltage especially for programming, and high speed. The Z2-FET is suitable for embedded memory applications.

  12. Recent operating experiences with steam generators in Japanese NPPs

    International Nuclear Information System (INIS)

    Yashima, Seiji

    1997-01-01

    In 1994, the Genkai-3 of Kyushu Electric Power Co., Inc. and the Ikata-3 of Shikoku Electric Power Co., Inc. started commercial operation, and now 22 PWR plants are being operated in Japan. Since the first PWR plant now 22 PWR plants are being operated in was started to operate, Japanese PWR plants have had an operating experience of approx. 280 reactor-years. During that period, many tube degradations have been experienced in steam generators (SGs). And, in 1991, the steam generator tube rupture (SGTR) occurred in the Mihama-2 of Kansai Electric Power Co., Inc. However, the occurrence of tube degradation of SGs has been decreased by the instructions of the MITI as regulatory authorities, efforts of Electric Utilities, and technical support from the SG manufacturers. Here the author describes the recent SGs in Japan about the following points. (1) Recent Operating Experiences (2) Lessons learned from Mihama-2 SGTR (3) SG replacement (4) Safety Regulations on SG (5) Research and development on SG

  13. Optimizing the use of operating experience at Ontario Hydro's Bruce Nuclear Generating Station 'A'

    Energy Technology Data Exchange (ETDEWEB)

    Williams, E L [Operating Experience Reactor Safety, Bruce Nuclear Generating Station ' A' , Ontario Hydro, Tiverton, Ontario (Canada)

    1991-04-01

    One of the most significant lessons learned from the Three Mile Island event (March 1979), and again with the Chernobyl disaster - (April 1986) was the ongoing requirement to learn from our mistakes and near misses, and those of our fellow utilities around the world: so that as an industry we do not repeat the same mistakes. The very future of our industry will depend on how well each one of us accomplishes this important ask. This paper describes in detail the challenges encountered by one station when incorporating a comprehensive 'Operating Program'. It begins with the Corporate Office's directives to its stations for such a program; and follows up with the details of the actual station implementation of the program, and day to day operating experiences. The paper describes in detail the following Operating Experience programs: - Root Cause Determination process. The Institute of Nuclear Power Operations, Human Performance Enhancement System (HPES) as an integral component of the Root Cause process. Finding solutions for our station for problems identified elsewhere is covered herein; - Significant Event Recommendation Tracking System: - Commitment Tracking System; - Operating Experience (Sharing Lessons Learned) System. The paper will show all the above processes tie closely together and complement each other. The paper discusses the staff required for such processes and their training requirements. It recommends process time lines, reporting mechanisms, and sign off requirements. It will describe the equipment utilized to carry out this work effectively, and with a minimum of staff. One unique feature of the Bruce 'A' system is an 'Effectiveness Follow-Up', usually three to six months after the event recommendations have been completed. By rechecking the finished actions and reviewing them with the personnel involved with the originating event we ensure that the real root causes have been identified and resolved. (author)

  14. Optimizing the use of operating experience at Ontario Hydro's Bruce Nuclear Generating Station 'A'

    International Nuclear Information System (INIS)

    Williams, E.L.

    1991-01-01

    One of the most significant lessons learned from the Three Mile Island event (March 1979), and again with the Chernobyl disaster - (April 1986) was the ongoing requirement to learn from our mistakes and near misses, and those of our fellow utilities around the world: so that as an industry we do not repeat the same mistakes. The very future of our industry will depend on how well each one of us accomplishes this important ask. This paper describes in detail the challenges encountered by one station when incorporating a comprehensive 'Operating Program'. It begins with the Corporate Office's directives to its stations for such a program; and follows up with the details of the actual station implementation of the program, and day to day operating experiences. The paper describes in detail the following Operating Experience programs: - Root Cause Determination process. The Institute of Nuclear Power Operations, Human Performance Enhancement System (HPES) as an integral component of the Root Cause process. Finding solutions for our station for problems identified elsewhere is covered herein; - Significant Event Recommendation Tracking System: - Commitment Tracking System; - Operating Experience (Sharing Lessons Learned) System. The paper will show all the above processes tie closely together and complement each other. The paper discusses the staff required for such processes and their training requirements. It recommends process time lines, reporting mechanisms, and sign off requirements. It will describe the equipment utilized to carry out this work effectively, and with a minimum of staff. One unique feature of the Bruce 'A' system is an 'Effectiveness Follow-Up', usually three to six months after the event recommendations have been completed. By rechecking the finished actions and reviewing them with the personnel involved with the originating event we ensure that the real root causes have been identified and resolved. (author)

  15. Operational experiences feedback in Bohunice NPP

    Energy Technology Data Exchange (ETDEWEB)

    Betak, A [NPP Bohunice (Slovakia)

    1997-10-01

    The presentation reviews the following issues: OEF team in Bohunice NPP - structure; training and qualification: ASSET seminars on Prevention of incidents - INES manual handling, NRA-NRC the training on event investigation methods, NU - the training on HPES; legislation - documentation prepared in the frame of QA programme; results of OEF team activities; ASSET mission Dukovany - Experiences; the perspective activities.

  16. Improving the Sharing and Use of Operating Experience Among Pressurized Heavy Water Reactors

    International Nuclear Information System (INIS)

    Llewellyn, Michael D.

    1998-01-01

    Effective use of operating experience is an essential and fundamental aspect of the business of improving safety and reliability of nuclear power plant. Operating experience is considered of such importance, that it is embedded as a fundamental element in the WANO mission statement: 'To maximise the safety and reliability of operation of nuclear power plants by exchanging information and encouraging communication, comparison, and emulation amongst its members'. The exchange of information on plant operating experience and lessons learned from events is at the core of our WANO mission and is an essential element of effective operating experience use. Recognizing this, WANO - AC has joined together with Canadian PHWR operators in a cooperative effort to further strengthen the sharing of the event information, and to facilitate communication of PHWR operating experience worldwide. The content of the paper is: 1. Discussion; 2. Expectation; 3. Improving use of operating experience; 4. Internalizing operating experience; 5. Summary; 6. Attachments. The three attachments deal with: - WANO event reporting guidelines; - Root cause investigation guidelines; - Example prevent events briefing sheet. The paper is completed with the five slides used in the oral presentation

  17. Operational experience of extreme wind penetrations

    Energy Technology Data Exchange (ETDEWEB)

    Estanqueiro, Ana [INETI/LNEG - National Laboratory for Energy and Geology, Lisbon (Portugal); Mateus, Carlos B. [Instituto de Meteorologia, Lisboa (Portugal); Pestana, Rui [Redes Energeticas Nacionais (REN), Lisboa (Portugal)

    2010-07-01

    This paper reports the operational experience from the Portuguese Power System during the 2009/2010 winter months when record wind penerations were observed: the instantaneous wind power penetration peaked at 70% of consumption during no-load periods and the wind energy accounted for more than 50% of the energy consumed for a large period. The regulation measures taken by the TSO are presented in the paper, together with the additional reserves operated for added system security. Information on the overall power system behavior under such extreme long-term wind power penetrations will also be addressed. (org.)

  18. Operational experience of the ATLAS accelerator

    Energy Technology Data Exchange (ETDEWEB)

    Den Hartog, P K; Bogaty, J M; Bollinger, L M; Clifft, B E; Craig, S L; Harden, R E; Markovich, P; Munson, F H; Nixon, J M; Pardo, R C; Phillips, D R; Shepard, K W; Tilbrook, I R; Zinkmann, G P [Argonne National Lab., IL (USA). Physics Div.

    1990-02-01

    The ATLAS accelerator consists of a HVEC model FN tandem accelerator injecting into a linac of independently-phased niobium superconducting resonators. The accelerator provides beams with masses 6 {le} A {le} 127 and with energies ranging up to 20 MeV/A for the lightest ions and 4 MeV/A for the heaviest ions. Portions of the linac have been in operation since 1978 and, over the last decade, more than 35000 h of operating experience have been accumulated. The long-term stability of niobium resonators, and their feasibility for use in heavy-ion accelerators is now well established. (orig.).

  19. Preheat operating experiences at the FFTF

    International Nuclear Information System (INIS)

    Tucker, W.R.

    1978-01-01

    The rather extensive test program performed on the FFTF preheat control system resulted in successful sodium fill of one secondary heat transport loop on July 2, 1978. The data obtained during testing and the attendant operating experience gained resulted in some design changes and provided the information necessary to fully characterize system performance. Temperature excursions and deviations from preset limits of only a minor nature were encountered during preheat for sodium fill. The addition of the rate alarm feature was beneficial to operation of the preheat system and allowed early detection and correction of impending excursions

  20. 42 CFR 52h.3 - Establishment and operation of peer review groups.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Establishment and operation of peer review groups... GRANTS SCIENTIFIC PEER REVIEW OF RESEARCH GRANT APPLICATIONS AND RESEARCH AND DEVELOPMENT CONTRACT PROJECTS § 52h.3 Establishment and operation of peer review groups. (a) To the extent applicable, the...

  1. Operating experience on radiation reduction in the latest BWRs

    International Nuclear Information System (INIS)

    Ohsumi, K.; Uchida, S.; Aizawa, M.; Takagi, K.; Amano, O.; Yamashita, K.

    1988-01-01

    In Japan, BWR plants have been operated commercially since 1970, and the reduction of radiation exposure has been an important concern. The application of the procedure for reducing occupational exposure is incorporated in Japanese Improvement and Standardization Program for LWRs. No.2 and No.4 plants in Fukushima No.2 Nuclear Power Station were designed and constructed as the latest 1,100 MWe BWRs in conformity with the Improvement and Standardization Program. No.2 plant began the commercial operation in February, 1984, and experienced three times of the scheduled annual maintenance outage. No.4 plant began the commercial operation in September, 1987, and the first annual maintenance is scheduled from September, 1988. In this paper, discussion is focused on recent radiation reduction measures, that is the control of iron and nickel in primary coolant for reducing the radiation dose rate in primary systems, based on the experience with No.2 and No.4 plants. The design concept of a low radiation dose rate nuclear power plant, the experience on water chemistry in No.2 plant, the control of iron and nickel in No.4 plant operation and so on are reported. It is believed that these operation experiences contribute to the reduction of occupational exposure in BWR plants currently in operation and in future. (Kako, I.)

  2. Large remote manipulator operating and maintenance experience at IEM cell

    International Nuclear Information System (INIS)

    Hicks, D.F.; McGuinness, P.W.

    1985-01-01

    The Interim Examination and Maintenance (IEM) Cell at the Fast Flux Test Facility (FFTF) has two large Electro-Mechanical Manipulators (EMM's). These manipulators are used for cell operations (processing of reactor core components) as well as general cell maintenance. From our eleven years of operation and maintenance experience with these large EMM's, we have learned many lessons concerning manipulator design. This paper describes the IEM Cell EMM design features and discusses operating and maintenance experience at the IEM Cell

  3. Operation experience at the UWTF

    International Nuclear Information System (INIS)

    Ueno, Kazuhiro; Inada, Kameji; Ohmori, Kouji; Usui, Kazuya; Irinouchi, Sigenori; Asami, Makoto; Tohchi, Katsunori

    2003-01-01

    This report describes the operation experience on the volume reduction of metal wastes and used air filters contaminated with uranium at the Uranium contaminated Waste Treatment Facility (UWTF) in JNC Tokai Works. The UWTF consists of the metal waste treatment system and the filter-waste treatment system. The former treats metal wastes, the latter treats used air filters. Metal wastes are unpacked from drums, cut, and then compacted. Used air filters are separated into filter media and frames. Then the filter media are compacted and the frames are crushed. The operation of the UWTF was started in June 1998. The following volumes of wastes had been treated at the UWTF from the beginning of the operation to March 2003 (for about 5 years). (1) 1,524 drums of the metal wastes had been reduced to 410 drums. The volume reduction factor was 3.7. (2) 372 drums of the used air filters had been reduced to 39 drums. The volume reduction factor was 9.5. These systems have been operated without trouble for 5 years and have demonstrated to be able to reduce the volumes of the wastes to designed values. The volume reduction technologies for metal wastes and used air filters contaminated with uranium were successfully demonstrated at the UWTF. (author)

  4. Feedback of operating experience into development of the advanced pressurized water reactor (APWR)

    International Nuclear Information System (INIS)

    Shimoda, S.; Venne, T. van de.

    1989-01-01

    The APWR development, which was successfully completed in 1987 with complete satisfaction of the design objectives, is one of the good examples of the successful international cooperative development. The successful completion of the development through management could be attributed to the following: Sophisticated implementation of development which consists of clear definition of performance goals, review and feedback of operating experience and consideration for reliable design through such development activities as detailed design evaluation, design reviews and verification by testings. Project organization and contractual arrangement which includes program director, project manager and engineering manager, and introduction of lead party/support party concept. Good oversea communication by means of high speed facsimile machine, electronic mail system and telephone conference, and frequent face-to-face meetings. Good communication with the utility companies at progress status and design decision meetings

  5. Canadian CANDU fuel development program and recent fuel operating experience

    International Nuclear Information System (INIS)

    Lau, J.H.K.; Inch, W.W.R.; Cox, D.S.; Steed, R.G.; Kohn, E.; Macici, N.N.

    1999-01-01

    This paper reviews the performance of the CANDU fuel in the Canadian CANDU reactors in 1997 and 1998. The operating experience demonstrates that the CANDU fuel has performed very well. Over the 2-year period, the fuel-bundle defect rate for all bundles irradiated in the Canadian CANDU reactors has remained very low, at between 0.006% to 0.016%. On a fuel element basis, this represents an element defect rate of less than about 0.0005%. One of the reasons for the good fuel performance is the support provided by the Canadian fuel research and development programs. These programs address operational issues and provide evolutionary improvements to the fuel products. The programs consist of the Fuel Technology Program, funded by the CANDU Owners Group, and the Advanced Fuel and Fuel Cycles Technology Program, funded by Atomic Energy of Canada Ltd. These 2 programs, which have been in place for many years, complement each other by sharing expert resources and experimental facilities. This paper describes the programs in 1999/2000, to provide an overview of the scope of the programs and the issues that these programs address. (author)

  6. Experience from operating germanium detectors in GERDA

    Science.gov (United States)

    Palioselitis, Dimitrios; GERDA Collaboration

    2015-05-01

    Phase I of the Germanium Detector Array (GERDA) experiment, searching for the neutrinoless double beta (0νββ) decay of 76Ge, was completed in September 2013. The most competitive half-life lower limit for the 0νββ decay of 76Ge was set (T-0ν1/2 > 2.1 · 1025 yr at 90% C.L.). GERDA operates bare Ge diodes immersed in liquid argon. During Phase I, mainly refurbished semi-coaxial high purity Ge detectors from previous experiments were used. The experience gained with handling and operating bare Ge diodes in liquid argon, as well as the stability and performance of the detectors during GERDA Phase I are presented. Thirty additional new enriched BEGe-type detectors were produced and will be used in Phase II. A subgroup of these detectors has already been used successfully in GERDA Phase I. The present paper gives an overview of the production chain of the new germanium detectors, the steps taken to minimise the exposure to cosmic radiation during manufacturing, and the first results of characterisation measurements in vacuum cryostats.

  7. The VEPP-2000 Collider Control System: Operational Experience

    CERN Document Server

    Senchenko, A I; Lysenko, A P; Rogovsky, Yu A; Shatunov, P Yu

    2017-01-01

    The VEPP-2000 collider was commissioned and operated successfully in 2010-2013. During the operation the facility underwent continuous updates and experience in maintenance was acquired. Strong cooperation between the staff of the accelerator complex and the developers of the control system proved effective for implementing the necessary changes in a short time.

  8. EBR-II: summary of operating experience

    International Nuclear Information System (INIS)

    Perry, W.H.; Leman, J.D.; Lentz, G.L.; Longua, K.J.; Olson, W.H.; Shields, J.A.; Wolz, G.C.

    1978-01-01

    Experimental Breeder Reactor II (EBR-II) is an unmoderated, sodium-cooled reactor with a design power of 62.5 MWt. The primary cooling system is a submerged-pool type. The early operation of the reactor successfully demonstrated the feasibility of a sodium-cooled fast breeder reactor operating as an integrated reactor, power plant, and fuel-processing facility. In 1967, the role of EBR-II was reoriented from a demonstration plant to an irradiation facility. Many changes have been made and are continuing to be made to increase the usefulness of EBR-II for irradiation and safety tests. A review of EBR-II's operating history reveals a plant that has demonstrated high availability, stable and safe operating characteristics, and excellent performance of sodium components. Levels of radiation exposure to the operating and maintenance workers have been low; and fission-gas releases to the atmosphere have been minimal. Driver-fuel performance has been excellent. The repairability of radioactive sodium components has been successfully demonstrated a number of times. Recent highlights include installation and successful operation of (1) the hydrogen-meter leak detectors for the steam generators, (2) the cover-gas-cleanup system and (3) the cesium trap in the primary sodium. Irradiations now being conducted in EBR-II include the run-beyond-cladding breach fuel tests for mixed-oxide and carbide elements. Studies are in progress to determine EBR-II's capability for conducting important ''operational safety'' tests. These tests would extend the need and usefulness of EBR-II into the 1980's

  9. 1987 DOE review: First collider run operation

    International Nuclear Information System (INIS)

    Childress, S.; Crawford, J.; Dugan, G.

    1987-05-01

    This review covers the operations of the first run of the 1.8 TeV superconducting super collider. The papers enclosed cover: PBAR source status, fixed target operation, Tevatron cryogenic reliability and capacity upgrade, Tevatron Energy upgrade progress and plans, status of the D0 low beta insertion, 1.8 K and 4.7 K refrigeration for low-β quadrupoles, progress and plans for the LINAC and booster, near term and long term and long term performance improvements

  10. Duke staff tap into a fund of operating experience

    International Nuclear Information System (INIS)

    Anon.

    1997-01-01

    The benefits of the Operating Experience Database (OEDB) allows employees of the nuclear industry to access a fund of operating experience data on-line in order to help them make appropriate management decisions concerning problem solving for various plant-based problems. Recent successful uses include fire protection system design, improving compliance with technical specifications, and reducing unnecessary trips in turbines. It is anticipated that OEDB may well be used in the Ukraine and Russia in the future. (UK)

  11. IAEA-led Operational Safety Team Reviews Dukovany Nuclear Power Plant, Czech Republic

    International Nuclear Information System (INIS)

    2011-01-01

    Full text: An international team of nuclear installation safety experts, led by the International Atomic Energy Agency (IAEA), has commended the Dukovany Nuclear Power Plant (NPP) in the Czech Republic for its safety practices and has also made a series of recommendations to reinforce them. The IAEA assembled an international team of experts at the request of the Government of the Czech Republic to conduct an Operational Safety Review (OSART) of Dukovany NPP. Under the leadership of the IAEA's Division of Nuclear Installation Safety in Vienna, the OSART team performed an in-depth operational safety review of the plant from 6 to 23 June 2011. The team was made up of experts from Armenia, Germany, Hungary, Romania, Slovenia, Sweden, the UK and the USA. An OSART mission is designed as a review of programmes and activities essential to operational safety. It is not a regulatory inspection, nor is it a design review or a substitute for an exhaustive assessment of the plant's overall safety status. The team at Dukovany conducted an in-depth review of the aspects essential to the safe operation of the NPP, which is largely under the control of the site management. The conclusions of the review are based on the IAEA's Safety Standards and proven good international practices. The review covered the areas of Management, Organization and Administration; Training and Qualification; Operations; Maintenance; Technical Support; Operating Experience; Radiation Protection; Chemistry; and Emergency Planning and Preparedness. The OSART team has identified good plant practices, which will be shared with the rest of the nuclear industry for consideration of their application. Examples include: The plant uses an integrated approach to recruit, select, psychologically assess and train new employees. This approach has resulted in consistently high success rates for licensed operator examinations and the identification of potential candidates for various plant departments; The performance

  12. Operations and Maintenance Cost for Stratified Buildings: A Critical Review

    Directory of Open Access Journals (Sweden)

    Che-Ghani Nor Zaimah

    2016-01-01

    Full Text Available Building maintenance is essential in preserving buildings’ appearance and performance. It needs to upkeep the building performance to prolong its value and building life cycle. Malaysia is still lacking in managing cost for building operation and maintenance. It has been found that the cost for housing maintenance is high due to poor maintenance practices. In order to get better understanding on how to manage the cost, this study reviews the contributing factors that affecting operation and maintenance cost of stratified buildings in Malaysia. The research first identified the factors through extensive literature review and scrutinize on factors that affecting and can minimize operation and maintenance cost. This literature review offers insight into building maintenance scenario in Malaysia focusing on the issues and challenges. The study also finds that operation and maintenance cost for housing in Malaysia is still in poor state. Interestingly, this paper revealed that operation and maintenance cost is also influenced by three significant factors like expectation of tenants, building characteristics and building defects. Measures to reduce the housing operation and maintenance cost are also highlighted so that this study can be a stepping stone towards proposing efficient and effective facilities management strategies for affordable housing in future.

  13. Undergraduate surgical nursing preparation and guided operating room experience: A quantitative analysis.

    Science.gov (United States)

    Foran, Paula

    2016-01-01

    The aim of this research was to determine if guided operating theatre experience in the undergraduate nursing curricula enhanced surgical knowledge and understanding of nursing care provided outside this specialist area in the pre- and post-operative surgical wards. Using quantitative analyses, undergraduate nurses were knowledge tested on areas of pre- and post-operative surgical nursing in their final semester of study. As much learning occurs in nurses' first year of practice, participants were re-tested again after their Graduate Nurse Program/Preceptorship year. Participants' results were compared to the model of operating room education they had participated in to determine if there was a relationship between the type of theatre education they experienced (if any) and their knowledge of surgical ward nursing. Findings revealed undergraduates nurses receiving guided operating theatre experience had a 76% pass rate compared to 56% with non-guided or no experience (p nurses achieved a 100% pass rate compared to 53% with non-guided or no experience (p research informs us that undergraduate nurses achieve greater learning about surgical ward nursing via guided operating room experience as opposed to surgical ward nursing experience alone. Copyright © 2015 Elsevier Ltd. All rights reserved.

  14. National culture and operations management : a structured literature review

    NARCIS (Netherlands)

    Boscari, Stefania; Bortolotti, Thomas; Netland, Torbjorn; Rich, Nicholas

    2018-01-01

    National culture has received a substantial amount of interest in the operations management literature. We present the first structured review of articles studying national culture in operations management. Our search returned 51 papers published in ten leading journals between 2000 and 2017. We

  15. Chemistry in water reactors: operating experience and new developments. 2 volumes

    International Nuclear Information System (INIS)

    1994-01-01

    These proceedings of the International conference on chemistry in water reactors (Operating experience and new developments), Volume 1, are divided into 8 sessions bearing on: (session 1) Primary coolant activity, corrosion products (5 conferences), (session 2) Dose reduction (4 conferences), (session 3) New developments (4 conferences), poster session: Primary coolant chemistry (16 posters), (session 4) Decontamination (5 conferences), poster session (2 posters), (session 5) BWR-Operating experience (3 conferences), (session 6) BWR-Modelling of operating experience (4 conferences), (session 7) BWR-Basic studies (4 conferences), (session 8) BWR-New technologies (3 conferences)

  16. OSART guidelines - 2005 edition. Reference report for IAEA Operational Safety Review Teams (OSARTs)

    International Nuclear Information System (INIS)

    2005-01-01

    The International Atomic Energy Agency (IAEA) has put forward the vision of a global nuclear safety regime that provides for the protection of people and the environment from the effects of ionizing radiation from nuclear facilities, the minimization of the likelihood of accidents that could endanger life and property and effective mitigation of the effects of any such events should they occur. The strategic approach for achieving the vision of enhancing this regime involves four elements and aims at ensuring that the overall nuclear safety level in Member States continues to improve: - Improvement of national and international safety infrastructures: - Establishment and global acceptance of IAEA safety standards; - Integrated approach to the provision for the application of safety standards; and - Global network of knowledge and experience. The IAEA Operational Safety Review Team (OSART) programme provides advice and assistance to Member States to enhance the safety of nuclear power plants during commissioning and operation. The OSART programme, initiated in 1982, is available to all Member States with nuclear power plants under commissioning or in operation. The OSART methodology and its safety services may also be applied to other nuclear installations (e.g. fuel cycle facilities, research reactors). Conservative design, careful manufacture and sound construction are all prerequisites for safe operation of nuclear power plants. However, the safety of the plant depends ultimately on sound policies, procedures, processes and practices; on the capability and reliability of the commissioning and operating personnel; on comprehensive instructions; and on adequate resources. A positive attitude and conscientiousness on the part of the management and staff in discharging their responsibilities is important to safety. OSART missions consider these aspects in assessing a facility's operational practices in comparison with those used successfully in other countries and

  17. OSART guidelines - 2005 edition. Reference report for IAEA Operational Safety Review Teams (OSARTs)

    International Nuclear Information System (INIS)

    2007-01-01

    The International Atomic Energy Agency (IAEA) has put forward the vision of a global nuclear safety regime that provides for the protection of people and the environment from the effects of ionizing radiation from nuclear facilities, the minimization of the likelihood of accidents that could endanger life and property and effective mitigation of the effects of any such events should they occur. The strategic approach for achieving the vision of enhancing this regime involves four elements and aims at ensuring that the overall nuclear safety level in Member States continues to improve: - Improvement of national and international safety infrastructures: - Establishment and global acceptance of IAEA safety standards. - Integrated approach to the provision for the application of safety standards. And - Global network of knowledge and experience. The IAEA Operational Safety Review Team (OSART) programme provides advice and assistance to Member States to enhance the safety of nuclear power plants during commissioning and operation. The OSART programme, initiated in 1982, is available to all Member States with nuclear power plants under commissioning or in operation. The OSART methodology and its safety services may also be applied to other nuclear installations (e.g. fuel cycle facilities, research reactors). Conservative design, careful manufacture and sound construction are all prerequisites for safe operation of nuclear power plants. However, the safety of the plant depends ultimately on sound policies, procedures, processes and practices. On the capability and reliability of the commissioning and operating personnel. On comprehensive instructions. And on adequate resources. A positive attitude and conscientiousness on the part of the management and staff in discharging their responsibilities is important to safety. OSART missions consider these aspects in assessing a facility's operational practices in comparison with those used successfully in other countries and

  18. OSART guidelines - 2005 edition. Reference report for IAEA Operational Safety Review Teams (OSARTs)

    International Nuclear Information System (INIS)

    2008-01-01

    The International Atomic Energy Agency (IAEA) has put forward the vision of a global nuclear safety regime that provides for the protection of people and the environment from the effects of ionizing radiation from nuclear facilities, the minimization of the likelihood of accidents that could endanger life and property and effective mitigation of the effects of any such events should they occur. The strategic approach for achieving the vision of enhancing this regime involves four elements and aims at ensuring that the overall nuclear safety level in Member States continues to improve: - Improvement of national and international safety infrastructures: - Establishment and global acceptance of IAEA safety standards. - Integrated approach to the provision for the application of safety standards. And - Global network of knowledge and experience. The IAEA Operational Safety Review Team (OSART) programme provides advice and assistance to Member States to enhance the safety of nuclear power plants during commissioning and operation. The OSART programme, initiated in 1982, is available to all Member States with nuclear power plants under commissioning or in operation. The OSART methodology and its safety services may also be applied to other nuclear installations (e.g. fuel cycle facilities, research reactors). Conservative design, careful manufacture and sound construction are all prerequisites for safe operation of nuclear power plants. However, the safety of the plant depends ultimately on sound policies, procedures, processes and practices. On the capability and reliability of the commissioning and operating personnel. On comprehensive instructions. And on adequate resources. A positive attitude and conscientiousness on the part of the management and staff in discharging their responsibilities is important to safety. OSART missions consider these aspects in assessing a facility's operational practices in comparison with those used successfully in other countries and

  19. Experience in startup and operation of fast flux facility

    International Nuclear Information System (INIS)

    Moffitt, W.C.

    1980-01-01

    The testing program was structured to perform all testing under formal testing procedures with a test engineer as the test director and the plant operators operating the systems and equipment. This provided excellent training and experience for the operators in preparation for eventual reactor operation. Operations preparations for the testing and operation activities has consisted of academic training, formal on-the-job training including systems operation and examinations by persons with an expert knowledge on that portion of the plant, training at EBR-II and the High Temperature Sodium Facility for selected senior operators, operating procedure preparation, training on an FFTF Control Room operator training simulator, and formal written, oral and operating examinations

  20. Operational experience of the ATLAS accelerator

    International Nuclear Information System (INIS)

    Den Hartog, P.K.; Bogaty, J.M.; Bollinger, L.M.

    1989-01-01

    The ATLAS accelerator consists of a HVEC model FN tandem accelerator injecting into a linac of independently-phased niobium superconducting resonators. The accelerator provides beams with masses from 6≤A≤127 and with energies ranging up to 20 MeV/A for the lightest ions and 4 MeV/A for the heaviest ions. Portions of the linac have been in operation since 1978 and, over the last decade, more than 35,000 hours of operating experience have been accumulated. The long-term stability of niobium resonators, and their feasibility for use in heavy-ion accelerators is now well established. 11 refs., 3 figs., 1 tab

  1. Columbia River System Operation Review final environmental impact statement. Appendix A: River Operation Simulation (ROSE)

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. The River Operation Simulation Experts (ROSE) work group is comprised of representatives of the Corps, BPA, Reclamation, NMFS, Pacific Northwest Utilities Conference Committee (PNUCC), and Northwest Power Planning Council (NPPC). ROSE was responsible for using computer hydroregulation models to simulate the operation of the river system for all of the alternatives evaluated in screening and full scale analysis in SOR. These models are complex computer programs which sequentially route streamflows through each dam in the system, calculating the streamflows, reservoir elevations, spill, power generation and other information at each project and pertinent locations on the river system. ROSE first reviewed specifications of proposed alternatives to determine whether such alternatives were formulated adequately to be run on hydroregulation models

  2. Design and operating experiences with 50MW steam generator

    International Nuclear Information System (INIS)

    Kawara, M.; Yamaki, H.; Kanamori, A.; Tanaka, K.; Takahashi, T.

    1975-01-01

    The main purpose of the 50 MW steam generator is to have experiences of manufacturing and operation with large scale steam generator including necessary research and development works which can be reflected on the design and fabrication of 'Monju' (Japan 300 MWe prototype LMFBR). The detailed design of the 50 MW steam, generator was begun on March, 1972 and succeeded in the demonstration of 72 hours continuous operation with full power on June, 1974. It has been successfully operated since then, the performances of which have been evaluated through various kinds of tests. In this paper, the following items are mainly discussed system design, thermal and hydraulic design, structure and fabrication and some experiences on testing operation including cleaning and sodium flushing of equipment, sodium level control system, the behavior of hydrogen detection system and general outlook of the performance. (author)

  3. Design and operating experiences with 50MW steam generator

    Energy Technology Data Exchange (ETDEWEB)

    Kawara, M; Yamaki, H; Kanamori, A; Tanaka, K; Takahashi, T

    1975-07-01

    The main purpose of the 50 MW steam generator is to have experiences of manufacturing and operation with large scale steam generator including necessary research and development works which can be reflected on the design and fabrication of 'Monju' (Japan 300 MWe prototype LMFBR). The detailed design of the 50 MW steam, generator was begun on March, 1972 and succeeded in the demonstration of 72 hours continuous operation with full power on June, 1974. It has been successfully operated since then, the performances of which have been evaluated through various kinds of tests. In this paper, the following items are mainly discussed system design, thermal and hydraulic design, structure and fabrication and some experiences on testing operation including cleaning and sodium flushing of equipment, sodium level control system, the behavior of hydrogen detection system and general outlook of the performance. (author)

  4. PFR experience of bellows operating in sodium systems

    International Nuclear Information System (INIS)

    Hodgson, D.

    1980-01-01

    Although there was little operating experience with bellows in sodium systems available during the design phase of the UK 250 MWe prototype fast reactor, bellows were extensively utilised to seal valves and to overcome the problems of differential thermal movements in several important applications. However, because of this lack of operational experience in sodium and the non-availability of design codes it was considered prudent not to install bellows in situations where failure could possibly initiate events of unpredictable proportions, or in positions where replacement following failure would be extremely difficult i.e. involving complete shutdown of the reactor over an extended period (in excess of six months) and/or necessitate removal of large quantities of primary sodium from the reactor vessel. This paper describes some of the bellows units installed in the PFR and the performance achieved during six years of reactor operation

  5. Review of WAG Field Experience

    DEFF Research Database (Denmark)

    Christensen, Jes Reimer; Stenby, Erling Halfdan; Skauge, A.

    2001-01-01

    well spacing is in the order of 1000 m. For the fields reviewed, a common trend for the successful injections is an increased oil recovery in the range of 5 to 10% of the oil initially in place (OIIP). Very few field trials have been reported as unsuccessful, but operational problems are often noted...

  6. Flooding PSA with Plant Specific Operating Experiences of Korean PWRs

    International Nuclear Information System (INIS)

    Choi, Sun Yeong; Yang, Joon Yull

    2006-01-01

    The purpose of this paper is to update the flooding PSA with Korean plant specific operating experience data and the appropriate estimation method for the flooding frequency to improve the PSA quality. The existing flooding PSA used the NPE (Nuclear Power Experience) database up to 1985 for the flooding frequency. They are all USA plant operating experiences. So an upgraded flooding frequency with Korean specific plant operation experience is required. We also propose a method of only using the PWR (Pressurized Water Reactor) data for the flooding frequency estimation in the case of the flooding area in the primary building even though the existing flooding PSA used both PWR and BWR (Boiled Water Reactor) data for all kinds of plant areas. We evaluate the CDF (Core Damage Frequency) with the modified flooding frequency and compare the results with that of the existing flooding PSA method

  7. Usability and User Experience Information in Reviews

    DEFF Research Database (Denmark)

    Hedegaard, Steffen

    future versions of the prod- uct? The results show that users write about product use in terms related to standard and popularly researched aspects of usability and user experience, e.g. effiiency, effectiveness, enjoyment, frustration. The frequency with which different aspects are depicted in reviews...... differs significantly between product domains. We also find that reviews contain descriptions of more persistent usability issues. I devise automatic methods for classifying sentences with regard to dimensions of both usability and user experience and usability problems and perform a linguistic analysis...

  8. Lesson Learned from the Recent Operating Experience of Domestic Nuclear Power Plants

    International Nuclear Information System (INIS)

    Lee, Chang-Ju; Kim, Min-Chull; Koo, Bon-Hyun; Kim, Sang-Jae; Lee, Kyung-Won; Kim, Ji-Tae; Lee, Durk-Hun

    2007-01-01

    According to the public concerns, it seems that one of the main missions of a nuclear regulatory body is to collect operational experiences from various nuclear facilities, and to analyze their follow-up information. The extensive use of lessons learned from operating experiences to back fit safety systems, improve operator training and emergency procedures, and to focus more attention on human factors, safety culture and quality management systems are also desired. Collecting operational experiences has been mainly done regarding the incidents and major failures of components (so called 'event'), which usually demands lots of regulatory resources. This paper concentrates on new information, i.e. lesson learned from recent investigation results of domestic events which contain 5 years' experience. This information can induce many insights for improving operational safety of nuclear power plants (NPPs)

  9. Operating experience of Fugen-HWR in Japan

    Energy Technology Data Exchange (ETDEWEB)

    Yoshino, F [Reactor Regulation Division, Nuclear Safety Bureau, Science and Technology Agency, Tokyo (Japan)

    1991-04-01

    Fugen is a 165 MWe prototype heavy water reactor which mainly uses plutonium-uranium mixed oxide (MOX) fuel. Power Reactor and Nuclear Fuel Development Corporation (PNC) has taken responsibility for the advanced thermal reactor (ATR) project, with its name 'FUGEN' taken from the Buddhist God of Mercy. The project started in October 1967, to develop and establish the technology for this new type of reactor and to clarify MOX fuel performance in the reactor. Site construction began in December 1970 at Tsuruga and the plant commenced commercial operation on March 20, 1979. Since then, Fugen has been operated successfully for more than twelve years. The plant performance and reliability of this type of reactor has been demonstrated through the operation. All these operational experiences have contributed to the establishment of the ATR technology.

  10. Operating experience of Fugen-HWR in Japan

    International Nuclear Information System (INIS)

    Yoshino, F.

    1991-01-01

    Fugen is a 165 MWe prototype heavy water reactor which mainly uses plutonium-uranium mixed oxide (MOX) fuel. Power Reactor and Nuclear Fuel Development Corporation (PNC) has taken responsibility for the advanced thermal reactor (ATR) project, with its name 'FUGEN' taken from the Buddhist God of Mercy. The project started in October 1967, to develop and establish the technology for this new type of reactor and to clarify MOX fuel performance in the reactor. Site construction began in December 1970 at Tsuruga and the plant commenced commercial operation on March 20, 1979. Since then, Fugen has been operated successfully for more than twelve years. The plant performance and reliability of this type of reactor has been demonstrated through the operation. All these operational experiences have contributed to the establishment of the ATR technology

  11. The National Flood Interoperability Experiment: Bridging Resesarch and Operations

    Science.gov (United States)

    Salas, F. R.

    2015-12-01

    The National Weather Service's new National Water Center, located on the University of Alabama campus in Tuscaloosa, will become the nation's hub for comprehensive water resources forecasting. In conjunction with its federal partners the US Geological Survey, Army Corps of Engineers and Federal Emergency Management Agency, the National Weather Service will operationally support both short term flood prediction and long term seasonal forecasting of water resource conditions. By summer 2016, the National Water Center will begin evaluating four streamflow data products at the scale of the NHDPlus river reaches (approximately 2.67 million). In preparation for the release of these products, from September 2014 to August 2015, the National Weather Service partnered with the Consortium of Universities for the Advancement of Hydrologic Science, Inc. to support the National Flood Interoperability Experiment which included a seven week in-residence Summer Institute in Tuscaloosa for university students interested in learning about operational hydrology and flood forecasting. As part of the experiment, 15 hour forecasts from the operational High Resolution Rapid Refresh atmospheric model were used to drive a three kilometer Noah-MP land surface model loosely coupled to a RAPID river routing model operating on the NHDPlus dataset. This workflow was run every three hours during the Summer Institute and the results were made available to those engaged to pursue a range of research topics focused on flood forecasting (e.g. reservoir operations, ensemble forecasting, probabilistic flood inundation mapping, rainfall product evaluation etc.) Although the National Flood Interoperability Experiment was finite in length, it provided a platform through which the academic community could engage federal agencies and vice versa to narrow the gap between research and operations and demonstrate how state of the art research infrastructure, models, services, datasets etc. could be utilized

  12. Technician support for operation and maintenance of large fusion experiments: the tandem mirror experiment upgrade (TMX-U) approach

    International Nuclear Information System (INIS)

    Mattson, G.E.

    1983-01-01

    As experiments continue to grow in size and complexity, a few technicians will no longer be able to maintain and operate the complete experiment. Specialization is becoming the norm. Subsystems are becoming very large and complex, requiring a great deal of experience and training for technicians to become qualified maintenance/operation personnel. Formal in-house and off-site programs supplement on-the-job training to fulfill the qualification criteria. This paper presents the Tandem Mirror Experiment-Upgrade (TMX-U) approach to manpower staffing, some problems encountered, possible improvements, and safety considerations for the successful operation of a large experimental facility

  13. Operational experience of the Marcoule reactors; Experience d'exploitation des reacteurs de Marcoule

    Energy Technology Data Exchange (ETDEWEB)

    Conte, F [Commissariat a l' Energie Atomique, Centre de Production de Plutonium, Marcoule (France). Centre d' Etudes Nucleaires

    1963-07-01

    The results obtaining from three years operation of the reactors G-2, G-3 have made it possible to accumulate a considerable amount of operational experience of these reactors. The main original points: - the pre-stressed concrete casing - the possibility of loading while under power - automatic temperature control have been perfectly justified by the results of operation. The author confirms the importance of these original solutions and draws conclusions concerning the study of future nuclear power stations. (author) [French] Les resultats atteints apres trois ans de fonctionnement des reacteurs G-2/G-3 permettent une accumulation considerable de l'experience d'exploitation de ces reacteurs. Les principales originalites: - caisson en beton precontraint - chargement en marche - surveillance automatique des temperatures sont largement justifiees par l'exploitation actuelle. L'auteur confirme l'interet de ces solutions d'avant-garde et en tire des conclusions pour les etudes de futures centrales nucleaires. (auteur)

  14. Development of regulatory guide for review of aging management of the operating NPP

    Energy Technology Data Exchange (ETDEWEB)

    Shin, Tae Myung; Lee, Jae Kyung [Cheongju Univ., Cheongju (Korea, Republic of); Kim, Young Ryul [Korea Advanced Institute of Science and Technology, Taejon (Korea, Republic of)

    2001-03-15

    This is the final report of the second year study. Based on the first year study, proposal of revised guidelines, analysis of revised or newly issued IAEA safety guides and reference guidelines of developed countries, and proposal of detailed guidelines of aging management in PSR have been performed in the second year study. The summary of results in the study so far can be summarized as below, overall view on PSR and idea of effective domestic application were leaded through additional investigation and comparison of legal basis, experiences and current status of PSR implementation among the countries having operating NPPs including Korea. Strategies of adequate application of PSR are roughly reevaluated and totally reestablished in summary from the analysis in factor by factor basis of PSR implementation experience in foreign countries and background of IAEA guidelines. Models and draft framework of PSR report in the first year study were summarized and reevaluated, and structure and outline options of PSR guidelines for judging the PSR report are newly proposed with comparison of their strengths and weaknesses based on the first year study. Among the opt ions, guidelines framework equivalent to the PSR report was picked up as the best. For the judgement of aging management, the most appropriate one was chosen for the detailed judgement of aging management review in our PSR being based on the Standard Review Plan for License Renewal (SRP-LR) in United States considering potential future usage in the judgement for continued operation of old NPP at the time of expiration of its design life. A draft PSR guidelines is prepared and attached by revision of basic guidelines issued in 2000, considering the issues discussed for the draft revision of IAEA PSR guide, the draft IAEA document about 'experience of PSR implementation of member states', and the characteristics of Hungarian PSR Guidelines.

  15. ATLAS Strip Detector: Operational Experience and Run1-> Run2 Transition

    CERN Document Server

    Nagai, Koichi; The ATLAS collaboration

    2014-01-01

    Large hadron collider was operated very successfully during the Run1 and provided a lot of opportunities of physics studies. It currently has a consolidation work toward to the operation at $\\sqrt{s}=14 \\mathrm{TeV}$ in Run2. The ATLAS experiment has achieved excellent performance in Run1 operation, delivering remarkable physics results. The SemiConductor Tracker contributed to the precise measurement of momentum of charged particles. This paper describes the operation experience of the SemiConductor Tracker in Run1 and the preparation toward to the Run2 operation during the LS1.

  16. Operating experience and corrective action program at Ontario Hydro Nuclear

    International Nuclear Information System (INIS)

    Collingwood, Barry; Turner, David

    1998-01-01

    This is a slide-based talk given at the COG/IAEA: 5. Technical Committee Meeting on 'Exchange of operating experience of pressurized heavy water reactors'. In the introduction there are presented the operating experience (OPEX) program of OHN, and the OPEX Program Mission, ensuring that the right information gets to the right staff at the right time. The OPEX Processes are analysed. These are: - Internal Corrective Action; - Inter-site Lesson Transfer; - External Lesson Transfer; - External Posting of OHN Events; - Internalizing Operating Experience. Steps in solving the Corrective Action Program are described: - Identify the Problem; - Notify Immediate Supervision/Manager; - Evaluate the Problem; - Correct the Problem; Monitor/Report Status. The Internal Corrective Action is then presented as a flowchart. The internalizing operating experience is presented under three aspects: - Communication; - Interface; - Training. The following items are discussed, respectively: peer meetings, department/section meetings, safety meetings, e-mail folders, newsletters and bulletin boards; work planning, pre-job briefings, supervisors' briefing cards; classroom initial and refresher (case studies), simulator, management courses. A diagram is presented showing the flow and treatment of information within OHN, centered on the weekly screening meetings. Finally, the corrective action processes are depicted in a flowchart and analysed in details

  17. Operating experience at CEBAF

    International Nuclear Information System (INIS)

    Legg, R.

    1996-01-01

    CEBAF, the Continuous Electron Beam Accelerator Facility, is a 5-pass, recirculating, superconducting rf linac designed to provide exceptional beam quality at 4 GeV up to 200 μA CW. It is made up of an injector, two 400-MeV linacs, and 9 recirculation arcs having a total beamline length of more than 4.5 km. On Nov. 5, 1995, CEBAF delivered a 4 GeV, 25-μA CW electron beam to the first of 3 experimental halls and the experimental physics program was started 10 days later. Accelerator availability during the first month of the experimental run exceeded 75%. Beam properties measured in the experimental hall to date are a one sigma momentum spread of 5x10 -5 and an rms emittance of 0.2 nanometer-radians, better than design specification. CW beam has been provided from all 5 passes at 800 MeV intervals. Outstanding performance of the superconducting linacs suggests a machine energy upgrade to 6 GeV in the near term with eventual machine operation at 8-10 GeV. Results from commissioning and operations experience since the last conference are presented

  18. Experience from operating germanium detectors in GERDA

    International Nuclear Information System (INIS)

    Palioselitis, Dimitrios

    2015-01-01

    Phase I of the Germanium Detector Array (GERDA) experiment, searching for the neutrinoless double beta (0νββ) decay of 76 Ge, was completed in September 2013. The most competitive half-life lower limit for the 0νββ decay of 76 Ge was set (T- 0ν 1/2 > 2.1 · 10 25 yr at 90% C.L.). GERDA operates bare Ge diodes immersed in liquid argon. During Phase I, mainly refurbished semi-coaxial high purity Ge detectors from previous experiments were used. The experience gained with handling and operating bare Ge diodes in liquid argon, as well as the stability and performance of the detectors during GERDA Phase I are presented. Thirty additional new enriched BEGe-type detectors were produced and will be used in Phase II. A subgroup of these detectors has already been used successfully in GERDA Phase I. The present paper gives an overview of the production chain of the new germanium detectors, the steps taken to minimise the exposure to cosmic radiation during manufacturing, and the first results of characterisation measurements in vacuum cryostats. (paper)

  19. The University of Colorado OSO-8 spectrometer experiment. IV - Mission operations

    Science.gov (United States)

    Hansen, E. R.; Bruner, E. C., Jr.

    1979-01-01

    The remote operation of two high-resolution ultraviolet spectrometers on the OSO-8 satellite is discussed. Mission operations enabled scientific observers to plan observations based on current solar data, interact with the observing program using real- or near real-time data and commands, evaluate quick-look instrument data, and analyze the observations for publication. During routine operations, experiments were planned a day prior to their execution, and the data from these experiments received a day later. When a shorter turnaround was required, a real-time mode was available. Here, the real-time data and command links into the remote control center were used to evaluate experiment operation and make satellite pointing or instrument configuration changes with a 1-90 minute turnaround.

  20. Operations experience with the NAC-1 legal weight truck cask

    International Nuclear Information System (INIS)

    Viebrock, J.M.; Hoffman, C.C.

    1978-01-01

    The first three years of operation of Nuclear Assurance Corporation's (NAC) four (4) NAC-1 Casks have demonstrated that shipments of spent fuel, fuel rods and other highly irradiated reactor components can be moved routinely by legal weight truck transport. Shipments of these materials have involved some 800,000 miles of highway travel and cask handling at some fifteen different nuclear facilities. This paper presents details on NAC's operations experience with these casks including cask description, cask handling (loading and unloading), pre-shipment testing, facility turnaround and transit times, operator exposure, transport vehicles and shipper/carrier/cask owner responsibilities, actual experience with regard to facility interfacing requirements and operational procedures. Cask and equipment utilization is discussed together with the methods used to control operation costs and to improve the economics of truck transport

  1. Experience with respect to dose limitation in nuclear fuel service operations in the United Kingdom supporting civil nuclear power programmes

    International Nuclear Information System (INIS)

    Kennedy, J.W.

    1983-01-01

    Within the United Kingdom, the nuclear power generation programme is supported by nuclear fuel services including uranium enrichment, fuel fabrication and reprocessing, operated by British Nuclear Fuels Limited (BNFL). These have entailed the processing of large quantities of uranium and of plutonium and fission products arising in the course of irradiation of fuel in nuclear power stations and have necessitated substantial programmes for the radiological protection of the public and of the workers employed in the industry. This paper presents and reviews the statistics of doses recorded in the various sectors of nuclear fuel services operations against the background of the standards to which the industry is required to operate. A description is given of the development of BNFL policy in keeping with the objective of being recognized as among those industries regarded as safe and the resource implications of measures to reduce doses received by workers are reviewed in the light of experience. Finally, the paper reviews the epidemiological data which have been, and continue to be, collected for workers who have been employed in these nuclear fuel services. (author)

  2. Study on application of operating experience to new nuclear power plant

    International Nuclear Information System (INIS)

    Hong, Nam Pyo

    1991-01-01

    From the standpoint of designing the nuclear power plant, nine operating units have been designed and constructed as turn-key base by foreign Nuclear Steam Supply System (NSSS) Suppliers or as component base by foreign Architect/Engineer companies. In case of the component base project, the owner of electric company generally has merits that owner's operational experiences can be effectively incorporated from the beginning stage of design by A/E. Even though six nuclear units, Kori Units 3 and 4, Yonggwang Units 1 and 2, and Ulchin Units 1 and 2, were designed as component base by foreign A/E's, operational experience feedback from Kori Unit 1, such as design improvement and system upgrade, could not be reflected, because the design process of the following units started well ahead before Kori Unit 1 operating experience is obtained enough to reflect on future nuclear power plant design. It can be stated that foreign A/E's used their experience in designing nuclear projects on very limited basis

  3. Operational experience in the United Kingdom

    International Nuclear Information System (INIS)

    Gronow, W.S.

    1977-01-01

    In the UK there are 26 Magnox reactors and 4 AGRs operating on 11 licensed sites; a further 6 AGRs are under construction on 2 additional and one of the existing sites. The arrangements by which the Nuclear Installations Inspectorate, on behalf of the Health and Safety Executive, carries out its regulatory functions at operating nuclear power plants are described. The range of activities undertaken is described with special reference being made to the biennial shutdowns for approved maintenance and inspections which are required by conditions attached to the site licence. The other means by which the continuing safety of these power reactors is assured are explained and include the relationship with the licensee's own Nuclear Safety Committee, approved arrangements for modifications to plant systems or components which have importance for safety and long term reviews of safety aspects. (author)

  4. Feedback of safety - related operational experience: Lessons learned

    Energy Technology Data Exchange (ETDEWEB)

    Elias, D [Commonwealth Edison Co. (United States)

    1997-09-01

    The presentation considers the following aspects of feedback of safety-related operational experience: lessons learned program, objectives, personnel characteristics; three types of documents for transmitting lessons learned issues.

  5. Feedback of safety - related operational experience: Lessons learned

    International Nuclear Information System (INIS)

    Elias, D.

    1997-01-01

    The presentation considers the following aspects of feedback of safety-related operational experience: lessons learned program, objectives, personnel characteristics; three types of documents for transmitting lessons learned issues

  6. Discrete choice experiments of pharmacy services: a systematic review.

    Science.gov (United States)

    Vass, Caroline; Gray, Ewan; Payne, Katherine

    2016-06-01

    Background Two previous systematic reviews have summarised the application of discrete choice experiments to value preferences for pharmacy services. These reviews identified a total of twelve studies and described how discrete choice experiments have been used to value pharmacy services but did not describe or discuss the application of methods used in the design or analysis. Aims (1) To update the most recent systematic review and critically appraise current discrete choice experiments of pharmacy services in line with published reporting criteria and; (2) To provide an overview of key methodological developments in the design and analysis of discrete choice experiments. Methods The review used a comprehensive strategy to identify eligible studies (published between 1990 and 2015) by searching electronic databases for key terms related to discrete choice and best-worst scaling (BWS) experiments. All healthcare choice experiments were then hand-searched for key terms relating to pharmacy. Data were extracted using a published checklist. Results A total of 17 discrete choice experiments eliciting preferences for pharmacy services were identified for inclusion in the review. No BWS studies were identified. The studies elicited preferences from a variety of populations (pharmacists, patients, students) for a range of pharmacy services. Most studies were from a United Kingdom setting, although examples from Europe, Australia and North America were also identified. Discrete choice experiments for pharmacy services tended to include more attributes than non-pharmacy choice experiments. Few studies reported the use of qualitative research methods in the design and interpretation of the experiments (n = 9) or use of new methods of analysis to identify and quantify preference and scale heterogeneity (n = 4). No studies reported the use of Bayesian methods in their experimental design. Conclusion Incorporating more sophisticated methods in the design of pharmacy

  7. Helium turbomachinery operating experience from gas turbine power plants and test facilities

    International Nuclear Information System (INIS)

    McDonald, Colin F.

    2012-01-01

    The closed-cycle gas turbine, pioneered and deployed in Europe, is not well known in the USA. Since nuclear power plant studies currently being conducted in several countries involve the coupling of a high temperature gas-cooled nuclear reactor with a helium closed-cycle gas turbine power conversion system, the experience gained from operated helium turbomachinery is the focus of this paper. A study done as early as 1945 foresaw the use of a helium closed-cycle gas turbine coupled with a high temperature gas-cooled nuclear reactor, and some two decades later this was investigated but not implemented because of lack of technology readiness. However, the first practical use of helium as a gas turbine working fluid was recognized for cryogenic processes, and the first two small fossil-fired helium gas turbines to operate were in the USA for air liquefaction and nitrogen production facilities. In the 1970's a larger helium gas turbine plant and helium test facilities were built and operated in Germany to establish technology bases for a projected future high efficiency large nuclear gas turbine power plant concept. This review paper covers the experience gained, and the lessons learned from the operation of helium gas turbine plants and related test facilities, and puts these into perspective since over three decades have passed since they were deployed. An understanding of the many unexpected events encountered, and how the problems, some of them serious, were resolved is important to avoid them being replicated in future helium turbomachines. The valuable lessons learned in the past, in many cases the hard way, particularly from the operation in Germany of the Oberhausen II 50 MWe helium gas turbine plant, and the technical know-how gained from the formidable HHV helium turbine test facility, are viewed as being germane in the context of current helium turbomachine design work being done for future high efficiency nuclear gas turbine plant concepts. - Highlights:

  8. IAEA Operational Safety Team (OSART) Reviews Progress at Fessenheim Nuclear Power Plant, France

    International Nuclear Information System (INIS)

    2011-01-01

    Full text: An international team of nuclear installation safety experts, led by the International Atomic Energy Agency (IAEA), has evaluated the French Nuclear Power Plant (NPP) at Fessenheim to assess how the facility has followed up on an Operational Safety Review Team (OSART) mission undertaken in 2009. The IAEA assembled a team of experts at the request of the Government of France to conduct the mission. Follow-up missions are standard components of the OSART programme and are conducted 18-24 months after the initial OSART mission. Under the leadership of the IAEA's Division of Nuclear Installation Safety, the team performed its review from 7 to 11 February 2011. The team assessed how the Fessenheim NPP has addressed the recommendations and suggestions made during the 2009 OSART mission. The team was made up of experts from Slovakia, Switzerland and the IAEA. The review covered the areas of Management, Organization and Administration; Training and Qualifications; Operations; Maintenance; Technical Support; Operating Experience; Radiation Protection; Chemistry and Emergency Planning and Preparedness. The conclusions of the follow-up review are based on the IAEA's Safety Standards and proven good international practices. There were 21 issues raised by the 2009 mission. During the follow-up mission, the team assessed that six issues had been resolved, thirteen had made satisfactory progress to date and two had made insufficient progress to date. 'Resolved' describes action plans for improvement that have been fully implemented; 'satisfactory progress to date' describes action plans that have been developed but are not yet fully implemented; and 'insufficient progress to date' describes situations where additional consideration or strengthening of improvement plans is necessary. Examples of issues falling into different resolution categories include: The plant has resolved the suggestion to establish a process to review initial training materials on a regular basis

  9. Spanish Power Exchange Market Concepts and Operating Experience

    International Nuclear Information System (INIS)

    Gonzalez, J. J.; Gamito, C.

    2000-01-01

    On January, 1st, 1998, the Spanish Electricity Market started operations. All generators, distributors, commercialization companies, and final consumers negotiate al power exchanges either through the spot market or using bilateral contracts. The Spanish Power Exchange Market Operator (Compania Operadora del Mercado Espanol de electricidad, OMEL) is responsible for the management of the market and for the economic settlement and billing of a transactions on the Power Exchange market, and the technical operational process handled by the System Operator. This paper describes in detail the Spanish market principles and the experience gathered through the design, installation and first two years of market operation. The paper presents also the Spanish market results from January 1998 up to December 1999 indicating each specific market results and aggregate statistics. (Author)

  10. Abattoir operations and waste management in Nigeria: A review of ...

    African Journals Online (AJOL)

    Abattoir operations and waste management in Nigeria: A review of challenges ... Log in or Register to get access to full text downloads. ... militating against the establishment, operations and management of abattoirs are not given attention.

  11. Medical student experience in surgery influences their career choices: a systematic review of the literature.

    Science.gov (United States)

    Marshall, Dominic C; Salciccioli, Justin D; Walton, Sarah-Jane; Pitkin, Joan; Shalhoub, Joseph; Malietzis, George

    2015-01-01

    Student experiences during surgical rotations may dictate interest in future surgical careers. The objective of this study was to systematically examine the effect of surgical experience (SE) on student attitudes toward surgical careers and also to identify variables influencing the educational value of SE. A systematic review of the available literature was conducted by 2 independent researchers searching Medline, EMBASE, Google Scholar, and Cochrane databases, in accordance with the Preferred Reporting Items for Systematic Review and Meta-Analyses recommendations. Studies assessing SE during the students' surgical rotations were identified. The quality of the included studies was assessed using a validated quality index. Factors affecting student surgical rotation experience and perceptions of surgical careers were recorded. Overall, 204 studies were identified; 20 unique studies met the inclusion criteria with a median cohort size of 169 (interquartile range: 107-262) respondents. Most were cross-sectional surveys (n = 16/20) and administered to clinical students (n = 16/20). All studies investigating the effect of SE on career choices (n = 8) found that positive experiences during the surgical placement were associated with an increased interest in surgical careers. The operating theater experience was identified as a defining feature of overall SE. Involvement in operative procedures, a welcoming environment, and avoidance of syncopal events positively influenced the SE, particularly in those who actively sought educational opportunities. Study limitations included single-center and single-year cohort designs (70%) with the use of nonvalidated research tools (95%). A systematic review of the literature highlights a number of factors associated with a positive surgical rotation, which may lead to more students deciding to pursue a career in surgery. Understanding the factors that contribute to these decisions through multicenter studies using validated research

  12. Operating experience with nuclear power plants 2015. Pt. 1

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    2016-07-01

    The VGB Technical Committee ''Nuclear Plant Operation'' has been exchanging operating experience about nuclear power plants for more than 30 years. Plant operators from several European countries are participating in the exchange. A report is given on the operating results achieved in 2015, events important to plant safety, special and relevant repair, and retrofit measures from Germany. The second part of this report will focus on nuclear power plant in Belgium, Finland, the Netherlands, Switzerland, and Spain.

  13. LMFBR operational and experimental local-fault experience, primarily with oxide fuel elements

    International Nuclear Information System (INIS)

    Warinner, D.K.

    1980-01-01

    Case-by-case reviews of selective world experience with severe local faults, particularly fuel failure and fuel degradation, are reviewed for two sodium-cooled thermal reactors, several LMFBRs, and LMFBR-fuels experiments. The review summarizes fuel-failure frequency and illustrates the results of the most damaging LMFBR local-fault experiences of the last 20 years beginning with BR-5 and including DFR, BOR-60, BR2's MFBS- and Mol-loops experiments, Fermi, KNK, Rapsodie, EBR-II, and TREAT-D2. Local-fault accommodation is demonstrated and a need to more thoroughly investigate delayed-neutron and gaseous-fission-product signals is highlighted in view of uranate formation, observed blockages, and slow fuel-element failure-propagation

  14. An Experiment on the Impact of Communication Problems in the Multi-cultural Operation of NPPs' Emergency Operation

    International Nuclear Information System (INIS)

    Kang, Seongkeun; Lee, Chanyoung; Seong, Poong Hyun; Ha, Jun Su

    2015-01-01

    Korean government won a contract of nuclear power plants to UAE government in 2010 and nuclear power plants are now under construction in Barakah, UAE. However, with technology transfer and international cooperation, there needs to consider several potential problems due to the differences between two culture of the countries such as language, technical culture and expectation. It is unknown how potential problems can lead to an unsafe plant operation as well. We got to know language problem is the main issue from analyzing the OERs. Korean nuclear power plant operators will work in UAE and they will operate the NPPs with other countries' operators and managers. Therefore they will have to use English when they communicate each other. The purpose of this paper is to confirm how much operators get stress and how much accuracy is declined when operators communicate together in English. Reducing human error is quite important to make nuclear power plants safety. As mental workload of human operator is increased, operators get more stress, then the probability of occurring human error may be increased. It will affect bad influence to nuclear power plants safety. There are many factors to make mental workload increased. We focused on communication problem which is a key factor of the increasing mental workload because many Korean operators will work in UAE nuclear power plants and they may work together with UAE operators. We designed experimental methods to be able to check this problem qualitatively and quantitatively. We analyzed four factors to find the communication problems from the experiments which are accuracy, efficiency, NASA-TLX, and brain wave. Accuracy, efficiency, brain wave are quantitative factors, and NASA-TLX is qualitative factor. To find the impact of how much English affects the operators' workload, we did two cases of experiments; one is experiment for diagnosis and the other is experiment for execution

  15. An Experiment on the Impact of Communication Problems in the Multi-cultural Operation of NPPs' Emergency Operation

    Energy Technology Data Exchange (ETDEWEB)

    Kang, Seongkeun; Lee, Chanyoung; Seong, Poong Hyun [KAIST, Daejeon (Korea, Republic of); Ha, Jun Su [KUSTAR, Abu Dhabi (United Arab Emirates)

    2015-10-15

    Korean government won a contract of nuclear power plants to UAE government in 2010 and nuclear power plants are now under construction in Barakah, UAE. However, with technology transfer and international cooperation, there needs to consider several potential problems due to the differences between two culture of the countries such as language, technical culture and expectation. It is unknown how potential problems can lead to an unsafe plant operation as well. We got to know language problem is the main issue from analyzing the OERs. Korean nuclear power plant operators will work in UAE and they will operate the NPPs with other countries' operators and managers. Therefore they will have to use English when they communicate each other. The purpose of this paper is to confirm how much operators get stress and how much accuracy is declined when operators communicate together in English. Reducing human error is quite important to make nuclear power plants safety. As mental workload of human operator is increased, operators get more stress, then the probability of occurring human error may be increased. It will affect bad influence to nuclear power plants safety. There are many factors to make mental workload increased. We focused on communication problem which is a key factor of the increasing mental workload because many Korean operators will work in UAE nuclear power plants and they may work together with UAE operators. We designed experimental methods to be able to check this problem qualitatively and quantitatively. We analyzed four factors to find the communication problems from the experiments which are accuracy, efficiency, NASA-TLX, and brain wave. Accuracy, efficiency, brain wave are quantitative factors, and NASA-TLX is qualitative factor. To find the impact of how much English affects the operators' workload, we did two cases of experiments; one is experiment for diagnosis and the other is experiment for execution.

  16. Operating results and experience and operating regimes in changing demands of energy world

    International Nuclear Information System (INIS)

    Hobza, L.

    2004-01-01

    In this paper, there are stated some operating results and experience obtained from trial operation of Temelin NPP. In Europe, Temelin NPP is presently one of the latest implemented projects of the series of VVER 1000 nuclear units with proven V-320 pressurized water reactor. The distinction between Temelin NPP and original project lays mainly in supply of nuclear fuel and in I and C systems delivered by Westinghouse Company. Temelin NPP has passed through commissioning period and trial operation. The main goal of the trial operation was to meet the requirements of section 2, par. 4, point b) of Decree No. 106/98 Sb. and verification of project parameters and stability of operation, and the situation leading to violation of safety functions fulfilment according to Pre-operational Safety Report should not occur. The integral part of trial operation assessment was also successful performing of determined monitoring programmes, first refuelling and performing of prescribed tests and operational inspections. Simultaneously, first experience was obtained with nuclear fuel; providing of ancillary services; reliability of important components; operation of turbine-generator 1000 MW; chemical regime; influence to environment; and quality of contractors. As safety is the most important indicator, it can be stated that: no facts which would lead to decreasing of safety systems operability have been detected; no facts which would lead to negative affecting of barriers against fading the radioactivity into both working areas and environment, have been detected; good condition of fire safety has been continuously documented; requirements of limits for releasing waste water into environment have been continuously complied with; requirements of limits for releasing radioactive substances (in gaseous and/or liquid state) into environment have been continuously complied with. From the operation regimes point of view is clear, that it would be suitable for the power plant if the

  17. Design improvements, construction and operating experience with BWRs in Japan

    International Nuclear Information System (INIS)

    Uchigasaki, G.; Yokomi, M.; Sasaki, M.; Aoki, R.; Hashimoto, H.

    1983-01-01

    (1) The first domestic-made 1100-MW(e) BWR in Japan commenced commercial operation in April 1982. The unit is the leading one of the subsequent three in Fukushima Daini nuclear power station owned by the Tokyo Electric Power Company Inc. (Tepco). Based on the accumulated construction and operation experience of 500-MW(e) and 800-MW(e) class BWRs, improvements in various aspects during both the design and construction stages were introduced in core and fuel design with advanced gadolinia distribution, reactor feedwater treatment technology for crud reduction, a radwaste island, control and instrumentation to cope with the lessons learned through Three Mile Island assessment etc. (2) Based on many operating experiences with BWRs, an improved BWR core, which has easier operability and higher load factor than the conventional core, has been developed. The characteristic of the improved core is ''axially two-zoned uranium enrichment distribution''; the enrichment of the upper part of the fuel is slightly higher than that of the lower part. Through the improved core it became possible to optimize the axial power flattening and core reactivity control separately by axial enrichment distribution and burnable poison content. The improved fuels were loaded into operating BWRs and successfully proved the performance by this experience. (3) To shorten annual outage time, to reduce radiation exposure, to save manpower, and to achieve high reliability and safety of inspection operation, the remote automatic service and inspection equipment were developed in Japan. This paper presents the concept, distinctive features, and actual operation experience of the automatic refuelling machine, control-rod drive (CRD) remote-handling machine, improved main steam line isolation plug, and the automated ultrasonic inspection system with a computerized data processing unit, which have been developed by Hitachi, Ltd. with excellent results. (author)

  18. The continuation training of operators and feedback of operational experience in the Royal Navy's nuclear submarine programme

    International Nuclear Information System (INIS)

    Manson, R.P.

    1983-01-01

    Naval continuation training has relied heavily on the use of realistic simulators for over ten years, and this has been proved to be a cost-effective and efficient method of training. The type of simulator used, the selection and qualification of simulator instructors, and the method of training experienced operators is described. Also, the assessment of operator performance, the use of simulators during the final stages of operator qualification, and their use for training operators on plant operation whilst shut-down are covered. The Navy also pays great attention to the feedback of operating experience from sea into both continuation and basic training. This is accomplished using Incident Reports, which are rendered whenever the plant is operated outside the approved Operating Documentation, or when any other unusual circumstance arises. Each Report is individually assessed and replied to by a qualified operator, and those incidents of more general interest are published in a wider circulation document available to all plant operators. In addition, each crew is given an annual lecture on recent operating experiences. Important lessons are fed forward into new plant design, and the incident reports are also used as a source of information for plant reliability data. (author)

  19. 0 + 5 Vascular Surgery Residents' Operative Experience in General Surgery: An Analysis of Operative Logs from 12 Integrated Programs.

    Science.gov (United States)

    Smith, Brigitte K; Kang, P Chulhi; McAninch, Chris; Leverson, Glen; Sullivan, Sarah; Mitchell, Erica L

    2016-01-01

    Integrated (0 + 5) vascular surgery (VS) residency programs must include 24 months of training in core general surgery. The Accreditation Council for Graduate Medical Education currently does not require specific case numbers in general surgery for 0 + 5 trainees; however, program directors have structured this time to optimize operative experience. The aim of this study is to determine the case volume and type of cases that VS residents are exposed to during their core surgery training. Accreditation council for graduate medical education operative logs for current 0 + 5 VS residents were obtained and retrospectively reviewed to determine general surgery case volume and distribution between open and laparoscopic cases performed. Standard statistical methods were applied. A total of 12 integrated VS residency programs provided operative case logs for current residents. A total of 41 integrated VS residents in clinical years 2 through 5. During the postgraduate year-1 training year, residents participated in significantly more open than laparoscopic general surgery cases (p surgery cases are hernia repair (20%), skin and soft tissue (7.4%), and breast (6.3%). Residents in programs with core surgery over 3 years participated in significantly more general surgery operations compared with residents in programs with core surgery spread out over 4 years (p = 0.035). 0 + 5 VS residents perform significantly more open operations than laparoscopic operations during their core surgery training. The majority of these operations are minor, nonabdominal procedures. The 0 + 5 VS residency program general surgery operative training requirements should be reevaluated and case minimums defined. The general surgery training component of 0 + 5 VS residencies may need to be restructured to meet the needs of current and future trainees. Copyright © 2016 Association of Program Directors in Surgery. Published by Elsevier Inc. All rights reserved.

  20. ATLAS Pixel Detector Operational Experience

    CERN Document Server

    Di Girolamo, B; The ATLAS collaboration

    2011-01-01

    The ATLAS Pixel Detector is the innermost detector of the ATLAS experiment at the Large Hadron Collider at CERN, providing high-resolution measurements of charged particle tracks in the high radiation environment close to the collision region. This capability is vital for the identification and measurement of proper decay times of long-lived particles such as b-hadrons, and thus vital for the ATLAS physics program. The detector provides hermetic coverage with three cylindrical layers and three layers of forward and backward pixel detectors. It consists of approximately 80 million pixels that are individually read out via chips bump-bonded to 1744 n-in-n silicon substrates. In this talk, results from the successful operation of the Pixel Detector at the LHC will be presented, including monitoring, calibration procedures, timing optimization and detector performance. The detector performance is excellent: 96.9% of the pixels are operational, noise occupancy and hit efficiency exceed the design specification, an...

  1. 4th Evian Workshop on LHC beam operation

    CERN Document Server

    Goddard, B; Dubourg, S

    2013-01-01

    The principle aims of the workshop are to: review and capture 2012 LHC beam operations experience; review system performance; examine the foreseen challenges and limitations of post long shutdown operations; have a look at possible running scenarios in the post long shutdown era.

  2. Quality Assurance Review of SKB's Copper Corrosion Experiments

    International Nuclear Information System (INIS)

    Baldwin, Tamara D.; Hicks, Timothy W.

    2010-06-01

    SKB is preparing a license application for the construction of a final repository for spent nuclear fuel in Sweden. This application will be supported by the safety assessment SR-Site for the post-closure phase. The assessment of long-term safety is based on a broad range of experimental results from laboratory scale, intermediate scale and up to full scale experiments. It is essential that there is a satisfactory level of assurance that experiments have been carried out with sufficient quality, so that results can be considered to be reliable within the context of their use in safety assessment. The former named authority, SKI, has initiated a series of reviews of SKB's methods of quality assurance and their implementation. This quality assurance review is focused on the work of copper corrosion being conducted in at SKB's Hard Rock Laboratory (HRL) in Aespoe, LOT and Miniature canister (Minican) experiments. In order for the reviewers to get a broad understanding of the issue of copper corrosion both SKB reports as well as the viewpoint of MKG was collected prior to commencement of the actual review task. The purpose of this project is to assess SKB's quality assurance with the view of providing input for the preparation of the SR-Site safety assessment. This has been achieved by examination of the corrosion part of the LOT and Minican experiments using a check list, visits to the relevant facilities, and meetings with contractors and a few members of the SKB staff. The same approach for quality assurance reviews has been used earlier in similar review tasks. During the quality review of the selected projects, several QA- related issues of different degree of severity was noted by the reviewers. The most significant finding was that SKB has chosen to present only selected real-time corrosion monitoring data in TR-09-20. This was surprising and SSM expect that SKB will analyse the reason for this thoroughly. The reviewers also made other observations which can be

  3. Quality and Operations Management in Food Supply Chains: A Literature Review

    Directory of Open Access Journals (Sweden)

    Yong He

    2018-01-01

    Full Text Available We present a literature review on quality and operations management problems in food supply chains. In food industry, the quality of the food products declines over time and should be addressed in the supply chain operations management. Managing food supply chains with operations management methods not only generates economic benefit, but also contributes to environmental and social benefits. The literature on this topic has been burgeoning in the past few years. Since 2005, more than 100 articles have been published on this topic in major operations research and management science journals. In this literature review, we concentrate on the quantitative models in this research field and classify the related articles into four categories, that is, storage problems, distribution problems, marketing problems, and food traceability and safety problems. We hope that this review serves as a reference for interested researchers and a starting point for those who wish to explore it further.

  4. Simulator experiments on operator reliability and training effectiveness

    International Nuclear Information System (INIS)

    Singh, A. Spurgin, A.J.

    1990-01-01

    This paper discusses some aspects of the Operator Reliability Experiments project sponsored by Electric Power Research Institute. The paper deals with modifications to the HCR correlation which have resulted from the study of operators in responding to nuclear accident scenarios using emergency procedures. The interpretation of time response data and how insights in crew performance can lead to improvements in not only crew performance but also in training effectiveness are discussed

  5. Industry use of operating experience to achieve improved nuclear plant safety

    International Nuclear Information System (INIS)

    Zebroski, E.L.

    1981-01-01

    A principal lesson drawn from the accident at Three Mile Island was the need for a comprehensive and rigorous system for analysis and feedback of operating experience to reactor operators. Chief executives of US utilities directed in mid-1979 that an intensive and rigorous system of analysis and feedback of operating experience be established. This system is commonly referred to as the ''Significant Events Program''. Since April 1980, the Nuclear Safety Analysis Center (NSAC) has been joined by the Institute for Nuclear Power Operations (INPO) in the field investigation of significant operating events. NSAC has responsibility for analysis of the design and physical events aspects, while INPO has primary responsibility for the operators' aspects, including procedures and training. The process of screening, analysis and feedback of operating experience is now functioning as a seven-step process. A variety of data sources is used, including License Event Reports and outage and major maintenance reports. These are compiled and indexed in convenient form. However, such data bases are used only as incidental tools for the basic investigations and analytical efforts. Rapid dissemination of results is provided by a computer-aided conferencing system, which links 70 operating LWR reactors in the USA, and which has now been extended to four utilities outside the USA, representing several dozen more reactors. Major safety and economic incentives are evident for the rigorous use of such operating experience and for participation in a comprehensive system. Traditional habits of secrecy are recognized as obstacles to timely communication. A principal responsibility of top management of reactor-operating organizations is to overcome such habits where they are counter to the public interest, as well as to the health and survival interest of the utility itself

  6. Effective corrective actions to enhance operational safety of nuclear installations

    International Nuclear Information System (INIS)

    2005-07-01

    The safe operation of nuclear power plants around the world and the prevention of incidents in these installations remain key concerns for the nuclear community. In this connection the feedback of operating experience plays a major role: every nuclear plant operator needs to have a system in place to identify and feed back the lessons learned from operating experience and to implement effective corrective actions to prevent safety events from reoccurring. An effective operating experience programme also includes a proactive approach that is aimed at preventing the first-time occurrence of safety events. In April 2003, the IAEA issued the PROSPER guidelines for nuclear installations to strengthen and enhance their own operating experience process and for self-assessment on the effectiveness of the feedback process. Subsequently, in the course of the Operational Safety Review Teams missions conducted by the IAEA that focused on the operational safety practices of nuclear power plants, the IAEA enhanced the review of the operating experience in nuclear power plants by implementing a new module that is derived from these guidelines. In order to highlight the effective implementation of the operating experience programme and to provide practical assistance in this area, the IAEA organized workshops and conferences to discuss recent trends in operating experience. The IAEA also performed assistance and review missions at plants and corporate organizations. The IAEA is further developing advice and assistance on operating experience feedback programmes and is reporting on good practices. The present publication is the outcome of two years of coordinated effort involving the participation of experts of nuclear organizations in several Member States. It provides information and good practices for successfully establishing an effective corrective actions programme. This publication forms part of a series that develops the principles set forth in these guidelines

  7. Long-term operating experience for the ATLAS superconducting resonators

    International Nuclear Information System (INIS)

    Pardo, R.; Zinkann, G.

    1999-01-01

    Portions of the ATLAS accelerator have been operating now for over 21 years. The facility has accumulated several million resonator-hours of operation at this point and has demonstrated the long-term reliability of RF superconductivity. The overall operating performance of the ATLAS facility has established a level of beam quality, flexibility, and reliability not previously achieved with heavy-ion accelerator facilities. The actual operating experience and maintenance history of ATLAS are presented for ATLAS resonators and associated electronics systems. Solutions to problems that appeared in early operation as well as current problems needing further development are discussed

  8. Experience from operation of WWER-440 model 213 nuclear power plants. Reference plant: Bohunice V2 (Slovakia). Report of the IAEA technical co-operation project RER/9/004 on evaluation of safety aspects of WWER-440 model 213 nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-01

    This TECDOC provides a comprehensive review of the operational experience with WWER-440/213 plants. It is hoped that it will be useful to anyone working in the field of WWER safety, and in particular to experts planning, executing or reviewing studies related to the subject. Refs, figs and tabs.

  9. Experience from operation of WWER-440 model 213 nuclear power plants. Reference plant: Bohunice V2 (Slovakia). Report of the IAEA technical co-operation project RER/9/004 on evaluation of safety aspects of WWER-440 model 213 nuclear power plants

    International Nuclear Information System (INIS)

    1995-07-01

    This TECDOC provides a comprehensive review of the operational experience with WWER-440/213 plants. It is hoped that it will be useful to anyone working in the field of WWER safety, and in particular to experts planning, executing or reviewing studies related to the subject. Refs, figs and tabs

  10. The Canadian CANDU fuel development program and recent fuel operating experience

    International Nuclear Information System (INIS)

    Lau, J.H.K.; Inch, W.W.R.; Cox, D.S.; Steed, R.G.; Kohn, E.; Macici, N.N.

    1999-01-01

    This paper reviews the performance of the CANDU fuel in the Canadian CANDU reactors in 1997 and 1998. The operating experience demonstrates that the CANDU fuel has performed very well. Over the two-year period, the fuel-bundle defect rate for all bundles irradiated in the Canadian CANDU reactors has remained very low, at between 0.006% to 0.016%. On a fuel element basis, this represents an element defect rate of less than about 0.0005%. One of the reasons for the good fuel performance is the support provided by the Canadian fuel research and development programs. These programs address operational issues and provide evolutionary improvements to the fuel products. The programs consist of the Fuel Technology Program, funded by the CANDU Owners Group, and the Advanced Fuel and Fuel Cycles Technology Program, funded by Atomic Energy of Canada Ltd. These two programs, which have been in place for many years, complement each other by sharing expert resources and experimental facilities. This paper describes the programs in 1999/2000, to provide an overview of the scope of the programs and the issues that these programs address. (author)

  11. Inspection-Class Remotely Operated Vehicles—A Review

    Directory of Open Access Journals (Sweden)

    Romano Capocci

    2017-03-01

    Full Text Available This paper presents a review of inspection-class Remotely Operated Vehicles (ROVs. The review divides the classification of inspection-class ROVs; categorising the vehicles in order of size and capability. A state of the art technology review is undertaken, discussing various common subsystems of the ROV. Standard and novel ROV shapes and designs are reviewed, with emphasis on buoyancy, frame materials and hydrodynamics. Several power considerations and designs are discussed, accounting for battery fed and mains fed systems. ROV telemetry is split into a discussion on the various transmission hardware systems and the communication protocols that are most widely used in industry and research today. A range of thruster technologies is then introduced with consideration taken of the various thruster architectures available. Finally, the navigation and positioning sensors employed for ROV navigation and control are reviewed. The author has also created a number of comparison tables throughout the review; tables include comparison of wired data transmission technology, comparison of common ROV communication protocols and comparisons of various inertial navigation systems. By the end of the review the reader will have clearer understanding on the fundamentals of inspection-class ROV technologies and can use this as an introduction to further paper investigation.

  12. Experience on implementation of the Integrated Safeguards approach for the MOX facility from the operator's point of view

    International Nuclear Information System (INIS)

    Nomi, Takayoshi; Nagatani, Taketeru; Ninagawa, Junichi; Nakajima, Shinji; Maruyama, Hajime; Asano, Takashi; Fujiwara, Shigeo

    2011-01-01

    The IS approach for the JNC-1 site was implemented in August 2008, and this was the first experience in the world. This IS approach aimed not only to improve efficiency and effectiveness of safeguards but also to reduce burden of the plant operation by improvement of efficiency of the inspection activity. It was planned to review effectiveness of this new approach after three years from implementation. And JAEA also evaluated effects by application of the IS approach for two MOX fuel facilities in the JNC-1 site based on the three years experiences from the operator's view point. As the result of evaluation, it was confirmed that there were some difference of benefits by application of the IS approach depending on features of the facility, automation level of equipment and advance level of safeguards systems. (author)

  13. British Columbia Power Export Corporation: Operational review for operating year, October 1989 to September 1990

    International Nuclear Information System (INIS)

    1990-01-01

    The British Columbia Power Export Corporation (POWEREX) is a wholly owned subsidiary of British Columbia Hydro, established in 1988 as the single agency responsible for implementing the provincial policy of international electricity trade. POWEREX objectives are to conduct long term firm electricity trade utilizing private sector financing, operating capabilities, and generating sources. Short term electricity transactions are handled by the part of POWEREX called the Powerex Pool Operation. An operational review of POWEREX for 1989-90 is presented, giving information on export contracts, license approvals, export sales negotiations, pool operation revenues and sales, British Columbia Hydro generation and integrated system performance, and operational planning. 15 figs

  14. Operating Experience at the Aagesta Nuclear Power Station

    Energy Technology Data Exchange (ETDEWEB)

    Sandstroem, S [ed.

    1966-09-15

    Sweden's first nuclear power reactor Agesta, achieved criticality on July 17, 1963. Full power (65 MW{sub t}) was attained on March 20, 1964. Aagesta is a heavy water cooled and moderated pressure vessel reactor used for production of electricity as well as for district heating. The design, assembly and construction etc, of the reactor was described in detail in a staff report by AB Atomenergi, 'The Aagesta Nuclear Power Station' edited by B McHugh, which was published in September, 1964. In the book experiences from the commissioning and the first operation of the reactor were reported as well as findings from the extensive reactor physics studies made during this period. The report now presented is written by members of the operating team at Aagesta since its start. It reflects in general the experiences up to the end of 1965. The Aagesta Log, however, covers the period up to the normal summer stop 1966. The reactor has hitherto produced 506,000 MWh power of which 48,700 MWh have been electric power. In July 1965 the responsibility for the reactor operation was taken over by the Swedish State Power Board from AB Atomenergi, which company had started the reactor and operated it until the summer break 1965.

  15. Operating Experience at the Aagesta Nuclear Power Station

    International Nuclear Information System (INIS)

    Sandstroem, S.

    1966-09-01

    Sweden's first nuclear power reactor Agesta, achieved criticality on July 17, 1963. Full power (65 MW t ) was attained on March 20, 1964. Aagesta is a heavy water cooled and moderated pressure vessel reactor used for production of electricity as well as for district heating. The design, assembly and construction etc, of the reactor was described in detail in a staff report by AB Atomenergi, 'The Aagesta Nuclear Power Station' edited by B McHugh, which was published in September, 1964. In the book experiences from the commissioning and the first operation of the reactor were reported as well as findings from the extensive reactor physics studies made during this period. The report now presented is written by members of the operating team at Aagesta since its start. It reflects in general the experiences up to the end of 1965. The Aagesta Log, however, covers the period up to the normal summer stop 1966. The reactor has hitherto produced 506,000 MWh power of which 48,700 MWh have been electric power. In July 1965 the responsibility for the reactor operation was taken over by the Swedish State Power Board from AB Atomenergi, which company had started the reactor and operated it until the summer break 1965

  16. Operating Experience at the Aagesta Nuclear Power Station

    Energy Technology Data Exchange (ETDEWEB)

    Sandstroem, S. (ed.)

    1966-09-15

    Sweden's first nuclear power reactor Agesta, achieved criticality on July 17, 1963. Full power (65 MW{sub t}) was attained on March 20, 1964. Aagesta is a heavy water cooled and moderated pressure vessel reactor used for production of electricity as well as for district heating. The design, assembly and construction etc, of the reactor was described in detail in a staff report by AB Atomenergi, 'The Aagesta Nuclear Power Station' edited by B McHugh, which was published in September, 1964. In the book experiences from the commissioning and the first operation of the reactor were reported as well as findings from the extensive reactor physics studies made during this period. The report now presented is written by members of the operating team at Aagesta since its start. It reflects in general the experiences up to the end of 1965. The Aagesta Log, however, covers the period up to the normal summer stop 1966. The reactor has hitherto produced 506,000 MWh power of which 48,700 MWh have been electric power. In July 1965 the responsibility for the reactor operation was taken over by the Swedish State Power Board from AB Atomenergi, which company had started the reactor and operated it until the summer break 1965.

  17. Organizational environment and operator culture

    International Nuclear Information System (INIS)

    Morisseau, D.S.; Schoenfeld, I.E.

    1988-01-01

    The Nuclear Regulatory Commission has historically reviewed corporate and plant level management and organization against the criteria of NUREG-0800, The Standard Review Plan. These criteria address the organizational structure, management control, lines of authority and communication, the range and level of experience, and the availability of manpower to effectively and safely operate the facility. Now that most nuclear power plants have received their operating licenses, the emphasis for review has shifted to the day-to-day operation of the facilities. Along with this has come greater recognition that hardware and engineering systems, through vitally important, are not the only components needed for safe operation of power plants. The people who run and operate these plants are a vitally important component and are an integral part of the entire system, i.e., machinery does not operate in isolation

  18. A REVIEW OF SOFTWARE-INDUCED FAILURE EXPERIENCE.

    Energy Technology Data Exchange (ETDEWEB)

    CHU, T.L.; MARTINEZ-GURIDI, G.; YUE, M.; LEHNER, J.

    2006-09-01

    We present a review of software-induced failures in commercial nuclear power plants (NPPs) and in several non-nuclear industries. We discuss the approach used for connecting operational events related to these failures and the insights gained from this review. In particular, we elaborate on insights that can be used to model this kind of failure in a probabilistic risk assessment (PRA) model. We present the conclusions reached in these areas.

  19. French experience of regulation and operation on reprocessing facilities of LWR spent fuels

    Energy Technology Data Exchange (ETDEWEB)

    Mercier, J P [DES/SESUL (France)

    1992-02-01

    This presentation describes the French experience of regulation and operation on reprocessing facilities: how the safety assessment was made of UP3-A plant of the La Hague establishment for the building permit and operating license within the context of French nuclear regulations and the national debate on the need for reprocessing. Other factors discussed are how the public was involved, how the regulations were improved in the process and what the different stages of commissioning consisted of. In the design studies of a reprocessing facility, three complementary approaches are used: - observance of regulations born of technical considerations, and good practice, - analysis of the hazards, using deterministic and probabilistic methods, within the framework of a safety report, - review of experience feedback from such a facility or like plants. The design of the facility must permit the prevention of accidents and limit their consequences. Moreover, during all foreseeable cases (normal operating, incidents and accidents), the safety of the staff, the public and the environment with regard to consequences of radioactive releases and ionising radiations must be ensured. In the evaluation of these consequences, the approach used is voluntarily pessimistic in order to take into account every possible case. It is based on the main following principles: definition of the events considered for the dimensioning of the facility; redundancy and diversification; defense in depth which consists of the multiplication of the barriers. The experience feedback comes, on the one hand from operator's findings aiming at improving its facility, on the other hand from incidents, the lessons of which being taken into account after careful analysis. These incidents are analyzed by the Safety Authority upon presentation of the data by the operator and on site findings of inspections. In other respects, the aim of inspections is to check that the plant and its operating practices are

  20. International Co-Operation in Control Engineering Education Using Online Experiments

    Science.gov (United States)

    Henry, Jim; Schaedel, Herbert M.

    2005-01-01

    This paper describes the international co-operation experience in teaching control engineering with laboratories being conducted remotely by students via the Internet. This paper describes how the students ran the experiments and their personal experiences with the laboratory. A tool for process identification and controller tuning based on…

  1. Operating experience and performance at Narora Atomic Power Station

    International Nuclear Information System (INIS)

    Mittal, Subhash; Gupta, J.P.

    1998-01-01

    Narora Atomic Power Station consists of two units of 220 MWe capacity each. These are Pressurized Heavy Water Reactors, fuelled by natural uranium, moderated and cooled by heavy water. The Station is owned by Nuclear Power Corporation of India Ltd., which is responsible for design, construction, commissioning, and operation of all nuclear power stations in the country. NAPS was the first opportunity to apply operating experiences in design, keeping in view the evolving safety and seismicity requirements, ease of maintenance, inservice inspection needs, improved construction ability and standardization. Both the units of NAPS are having improved safety standards of current international levels. All the equipment are indigenous with improved quality and reliability. The first unit of the station went critical in March 1989 and synchronized to the grid in July 1989. The second units followed with its criticality in October 1991 and synchronization in January 1992. Considering the initial stabilizing period, the performance of both units of NAPS has progressively improved over the years. The annual capacity factor for NAPS - 1 was 90.01% and for NAPS - 2 was 89.01% for the financial year 1997-1998. This paper presents an analysis of the performance during the last three years and measures taken to improve it. The stated enhanced performance could be achieved by improvement in human performance by training/re-training, scrupulous monitoring and review of equipment/systems, institution of adequate procedure and ensuring their adherence. (authors)

  2. Review of fast reactor operating experience gained in 1998 in Russia. General trends of future fast reactor development

    International Nuclear Information System (INIS)

    Poplavski, V.M.; Ashurko, Y.M.; Zverev, K.V.; Sarayev, O.M.; Oshkanov, N.N.; Korol'kov, A.S.

    1999-01-01

    Review of the general state of nuclear power in Russia as for 1998 is given in brief in the paper. Results of operation of BR-10, BOR-60 and BN-600 fast reactors are presented as well as of scientific and technological escort of the BN-350 reactor. The paper outlines the current status and prospects of South-Urals and Beloyarskaya power unit projects with the BN-800 reactors. The main planned development trends on fast reactors are described concerning both new projects and R and D works. (author)

  3. The Pajarito Site operating procedures for the Los Alamos Critical Experiments Facility

    International Nuclear Information System (INIS)

    Malenfant, R.E.

    1991-12-01

    Operating procedures consistent with DOE Order 5480.6, and the American National Standard Safety Guide for the Performance of Critical Experiments are defined for the Los Alamos Critical Experiments Facility (LACEF) of the Los Alamos National Laboratory. These operating procedures supersede and update those previously published in 1983 and apply to any criticality experiment performed at the facility. 11 refs

  4. Technical report on operating experience with boiling water reactor offgas systems

    International Nuclear Information System (INIS)

    Lo, R.; Barrett, L.; Grimes, B.; Eisenhut, D.

    1978-03-01

    Over 100 reactor years of Boiling Water Reactor (BWR) operating experience have been accumulated since the first commercial operation of BWRs. A number of incidents have occurred involving the ''offgas'' of these Boiling Water Reactors. This report describes the generation and processing of ''offgas'' in Boiling Water Reactors, the safety considerations regarding systems processing the ''offgas'', operating experience involving ignitions or explosions of ''offgas'' and possible measures to reduce the likelihood of future ignitions or explosions and to mitigate the consequences of such incidents should they occur

  5. Nuclear Power Plant Operating Experience from the IAEA/NEA International Reporting System for Operating Experience, 2005-2008

    International Nuclear Information System (INIS)

    2010-06-01

    The fundamental objective of the Incident Reporting System (IRS) is to contribute to improving the safety of commercial nuclear power plants which are operated worldwide. This fourth publication, covering the period 2005-2008, follows on the success of the previous three. It highlights important lessons learned based on a review of the approximately 200 event reports received from the participating countries over this period. The book is written both for a non-technical audience and for senior officials in industry and government who have decision making roles in the nuclear power industry.

  6. U.S. Nuclear Power Plant Operating Cost and Experience Summaries

    International Nuclear Information System (INIS)

    Reid, RL

    2003-01-01

    The ''U.S. Nuclear Power Plant Operating Cost and Experience Summaries'' (NUREG/CR-6577, Supp. 2) report has been prepared to provide historical operating cost and experience information on U.S. commercial nuclear power plants during 2000-2001. Costs incurred after initial construction are characterized as annual production costs, which represent fuel and plant operating and maintenance expenses, and capital expenditures related to facility additions/modifications, which are included in the plant capital asset base. As discussed in the report, annual data for these two cost categories were obtained from publicly available reports and must be accepted as having different degrees of accuracy and completeness. Treatment of inconclusive and incomplete data is discussed. As an aid to understanding the fluctuations in the cost histories, operations summaries for each nuclear unit are provided. The intent of these summaries is to identify important operating events; refueling, major maintenance, and other significant outages; operating milestones; and significant licensing or enforcement actions. Information used in the summaries is condensed from operating reports submitted by the licensees, the Nuclear Regulatory Commission (NRC) database for enforcement actions, and outage reports

  7. Integrating Renewable Generation into Grid Operations: Four International Experiences

    Energy Technology Data Exchange (ETDEWEB)

    Weimar, Mark R. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Mylrea, Michael E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Levin, Todd [Argonne National Lab. (ANL), Argonne, IL (United States); Botterud, Audun [Argonne National Lab. (ANL), Argonne, IL (United States); O' Shaughnessy, Eric [National Renewable Energy Lab. (NREL), Golden, CO (United States); Bird, Lori [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-04-22

    International experiences with power sector restructuring and the resultant impacts on bulk power grid operations and planning may provide insight into policy questions for the evolving United States power grid as resource mixes are changing in response to fuel prices, an aging generation fleet and to meet climate goals. Australia, Germany, Japan and the UK were selected to represent a range in the level and attributes of electricity industry liberalization in order to draw comparisons across a variety of regions in the United States such as California, ERCOT, the Southwest Power Pool and the Southeast Reliability Region. The study draws conclusions through a literature review of the four case study countries with regards to the changing resource mix and the electricity industry sector structure and their impact on grid operations and planning. This paper derives lessons learned and synthesizes implications for the United States based on answers to the above questions and the challenges faced by the four selected countries. Each country was examined to determine the challenges to their bulk power sector based on their changing resource mix, market structure, policies driving the changing resource mix, and policies driving restructuring. Each countries’ approach to solving those changes was examined, as well as how each country’s market structure either exacerbated or mitigated the approaches to solving the challenges to their bulk power grid operations and planning. All countries’ policies encourage renewable energy generation. One significant finding included the low- to zero-marginal cost of intermittent renewables and its potential negative impact on long-term resource adequacy. No dominant solution has emerged although a capacity market was introduced in the UK and is being contemplated in Japan. Germany has proposed the Energy Market 2.0 to encourage flexible generation investment. The grid operator in Australia proposed several approaches to maintaining

  8. Development of new HRA methods based upon operational experience

    International Nuclear Information System (INIS)

    Cooper, S.E.; Luckas, W.J.; Barriere, M.T.; Wreathall, J.

    2004-01-01

    Under the auspices of the US Nuclear Regulatory Commission (NRC), previously unaddressed human reliability issues are being investigated in order to support the development of human reliability analysis (HRA) methods for both low power and shutdown (LP and S) and full-power conditions. Actual operational experience, such as that reported in Licensee Event Reports (LERs), have been used to gain insights and provide a basis for the requirements of new HRA methods. In particular, operational experience has shown that new HRA methods for LP and S must address human-induced initiators, errors of commission, mistakes (vs. slips), dependencies, and the effects of multiple performance shaping factors (PSFs). (author)

  9. Ageing degradation mechanisms in nuclear power plants: lessons learned from operating experience

    International Nuclear Information System (INIS)

    Bieth, M.; Zerger, B.; Duchac, A.

    2014-01-01

    This paper presents main results of a comprehensive study performed by the European Clearinghouse on Operating Experience Feedback of Nuclear Power Plants (NPP) with the support of IRSN (Institut de Surete Nucleaire et de Radioprotection) and GRS (Gesellschaft fuer Anlagen und Reaktorsicherheit mbH). Physical ageing mechanisms of Structures, Systems and Components (SSC) that eventually lead to ageing related systems and components failures at nuclear power plants were the main focus of this study. The analysis of ageing related events involved operating experience reported by NPP operators in France, Germany, USA and to the IAEA/NEA International Reporting System on operating experience for the past 20 years. A list of relevant ageing related events was populated. Each ageing related event contained in the list was analyzed and results of analysis were summarized for each ageing degradation mechanism which appeared to be the dominant contributor or direct cause. This paper provides insights into ageing related operating experience as well as recommendations to deal with the physical ageing of nuclear power plant SSC important to safety. (authors)

  10. Estimation of fire frequency from PWR operating experience

    International Nuclear Information System (INIS)

    Bertrand, R.; Bonneval, F.; Barrachin, G.; Bonino, F.

    1998-01-01

    In the framework of a fire probabilistic safety assessment (Fire PSA), the French Institute for Nuclear Safety and Protection (IPSN) has developed a method for estimating the frequency of fire in a nuclear power plant room. This method is based on the analysis of French Pressurized Water Reactors operating experience. The method adopted consists is carrying out an in-depth analysis of fire-related incidents. A database has been created including 202 fire events reported in 900 MWe and 1300 MWe reactors from the start of their commercial operation up to the first of March 1994, which represents a cumulated service life of 508 reactor-years. For each reported fire, several data were recorded among which: The operating state of the reactor in the stage preceding the fire, the building in which the fire broke out, the piece of equipment or the human intervention which caused the fire. Operating experience shows that most fires are initiated by electrical problems (short-circuits, arcing, faulty contacts, etc.) and that human intervention also plays an important role (grinding, cutting, welding, cleaning, etc.). A list of equipment and of human interventions which proved to be possible fire sources was therefore drawn up. the items of this list were distributed in 19 reference groups defined by taking into account the nature of the potential ignition source (transformers, electrical cabinets, pumps, fans, etc.). The fire frequency assigned to each reference group was figured out using the operating experience information of the database. The fire frequency in a room is considered to be made out of two contributions: one due to equipment which is proportional to the number of pieces of equipment from each reference group contained in the room, and a second one which is due to human interventions and assumed to be uniform throughout the reactor. Formulas to assess the fire frequencies in a room, the reactor being in a shutdown state or at power, are then proposed

  11. Precision operation of the Nova laser for fusion experiments

    International Nuclear Information System (INIS)

    Caird, J.A.; Ehrlich, R.B.; Hermes, G.L.; Landen, O.L.; Laumann, C.W.; Lerche, R.A.; Miller, J.L.; Murray, J.E.; Nielsen, N.D.; Powell, H.T.; Rushford, M.C.; Saunders, R.L.; Thompson, C.E.; VanArsdall, P.J.; Vann, C.S.; Weiland, T.L.

    1994-01-01

    The operation of a Neodymium glass laser of a special design for fusion experiments is improved by a better pulse synchronization, the gain stabilization, and the laser diagnostics. We used sensor upgrading and antifriction coating of focusing lenses. The pointing accuracy of the Nova laser meets now our goal for precision operation. (AIP) copyright 1994 American Institute of Physics

  12. What is known about the patient's experience of medical tourism? A scoping review

    Science.gov (United States)

    2010-01-01

    Background Medical tourism is understood as travel abroad with the intention of obtaining non-emergency medical services. This practice is the subject of increasing interest, but little is known about its scope. Methods A comprehensive scoping review of published academic articles, media sources, and grey literature reports was performed to answer the question: what is known about the patient's experience of medical tourism? The review was accomplished in three steps: (1) identifying the question and relevant literature; (2) selecting the literature; (3) charting, collating, and summarizing the information. Overall themes were identified from this process. Results 291 sources were identified for review from the databases searched, the majority of which were media pieces (n = 176). A further 57 sources were included for review after hand searching reference lists. Of the 348 sources that were gathered, 216 were ultimately included in this scoping review. Only a small minority of sources reported on empirical studies that involved the collection of primary data (n = 5). The four themes identified via the review were: (1) decision-making (e.g., push and pull factors that operate to shape patients' decisions); (2) motivations (e.g., procedure-, cost-, and travel-based factors motivating patients to seek care abroad); (3) risks (e.g., health and travel risks); and (4) first-hand accounts (e.g., patients' experiential accounts of having gone abroad for medical care). These themes represent the most discussed issues about the patient's experience of medical tourism in the English-language academic, media, and grey literatures. Conclusions This review demonstrates the need for additional research on numerous issues, including: (1) understanding how multiple information sources are consulted and evaluated by patients before deciding upon medical tourism; (2) examining how patients understand the risks of care abroad; (3) gathering patients' prospective and retrospective

  13. Operating experience of steam generator test facility

    International Nuclear Information System (INIS)

    Sureshkumar, V.A.; Madhusoodhanan, G.; Noushad, I.B.; Ellappan, T.R.; Nashine, B.K.; Sylvia, J.I.; Rajan, K.K.; Kalyanasundaram, P.; Vaidyanathan, G.

    2006-01-01

    Steam Generator (SG) is the vital component of a Fast Reactor. It houses both water at high pressure and sodium at low pressure separated by a tube wall. Any damage to this barrier initiates sodium water reaction that could badly affect the plant availability. Steam Generator Test Facility (SGTF) has been set up in Indira Gandhi Centre for Atomic Research (IGCAR) to test sodium heated once through steam generator of 19 tubes similar to the PFBR SG dimension and operating conditions. The facility is also planned as a test bed to assess improved designs of the auxiliary equipments used in Fast Breeder Reactors (FBR). The maximum power of the facility is 5.7 MWt. This rating is arrived at based on techno economic consideration. This paper covers the performance of various equipments in the system such as Electro magnetic pumps, Centrifugal sodium pump, in-sodium hydrogen meters, immersion heaters, and instrumentation and control systems. Experience in the system operation, minor modifications, overall safety performance, and highlights of the experiments carried out etc. are also brought out. (author)

  14. Operational readiness reviews for restart of L reactor

    International Nuclear Information System (INIS)

    Finley, R.H.

    1984-01-01

    The L Reactor at the Savannah River Plant is being restarted after being in a standby status since 1968. Operational Readiness Reviews (ORRs) were conducted by DOE-SR and contractor personnel concurrent with the restart activity. This paper summarizes the ORR activity

  15. 30 CFR 773.9 - Review of applicant, operator, and ownership and control information.

    Science.gov (United States)

    2010-07-01

    ... operator's organizational structure and ownership or control relationships. (b) We must conduct the review... and control information. 773.9 Section 773.9 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION....9 Review of applicant, operator, and ownership and control information. (a) We, the regulatory...

  16. Annual meeting on nuclear technology 1980. Technical meeting: Operating experiences

    International Nuclear Information System (INIS)

    1980-01-01

    In addition to general experiences, experiences in reactor operation with relation to the Phenix reactor, KNK-2 reactor, the AVR reactor, the BWR-type KKI-reactor, the Philippsburg-1 reactor and the Obrigheim reactor are described. (DG) [de

  17. Experiences on operation, maintenance and utilization in JRR-2

    International Nuclear Information System (INIS)

    1994-08-01

    The Japan Research Reactor No.2 (JRR-2) is a high performance 10 MW multi purpose research reactor, heavy water moderated and cooled enriched uranium fuel used. Since the first criticality was attained in October, 1960, JRR-2 has been operated to satisfy the utilization demands, such as irradiation of fuel and materials, neutron beam experiments, radio isotope production and B.N.C.T (Boron Neutron Capture Therapy). During the operation, various kinds of troubles mainly caused by the old design concept had been occurred at the JRR-2 systems and components. Those troubles were solved with adequate countermeasures of timely repairs and large scale modifications with newest techniques. The works above were completely carried out by the staff of JRR-2 and related divisions. As a result, JRR-2 became one of the oldest research reactors which are still under operation in the world. Since JRR-2 has been utilized for more than 30 years, the operation mode was changed from 12 days-one cycle to 3 days-one cycle in April, 1994, taking into consideration aging of the reactor systems. In this paper, the experiences of JRR-2 for more than 30 years such as operation, maintenance, repair, modifications and utilization on JRR-2 are described. (author)

  18. Operating experience review -- Conduct of operations at Department of Energy facilities

    International Nuclear Information System (INIS)

    1994-08-01

    This research examined human error related occurrences, reported in the ORPS database, for the purpose of identifying weaknesses in the implementation of the guidance regarding the Conduct of Operations contained in DOE 5480.19. Specifically, this research examined three separate samples of occurrence reports from Defense Program facilities, which cited human error as a direct or contributing cause. These reports were evaluated using a coding scheme which incorporated the guidelines present in 5480.19, as well as a number of generic human factors concerns. The second chapter of this report summarizes the coding scheme which was used to evaluate the occurrence reports. Since the coding scheme is quite lengthy, only the parts of the scheme needed to make the remainder of the report clear are included in this chapter. Details on the development and content of the coding scheme are reported in Appendices A, B, and C. Chapter 3 presents the analysis of three different data sets. This chapter demonstrates that similar results were obtained across different data sets, collected at different points in time, and coded by different raters. The implications of the results obtained in Chapter 3 are discussed in Chapter 4. This chapter makes a number of suggestions for reducing the problems found in the occurrence reports. Chapter 5 applies the methodology that has been developed in this report to two facilities at Los Alamos National Laboratory. Finally, Chapter 6 reiterates the major findings of this report. Several additional analyses appear in appendices at the end of this report

  19. The Drop Tower Bremen -Experiment Operation

    Science.gov (United States)

    Könemann, Thorben; von Kampen, Peter; Rath, Hans J.

    The idea behind the drop tower facility of the Center of Applied Space Technology and Micro-gravity (ZARM) in Bremen is to provide an inimitable technical opportunity of a daily access to short-term weightlessness on earth. In this way ZARM`s european unique ground-based microgravity laboratory displays an excellent economic alternative for research in space-related conditions at low costs comparable to orbital platforms. Many national and international ex-perimentalists motivated by these prospects decide to benefit from the high-quality and easy accessible microgravity environment only provided by the Drop Tower Bremen. Corresponding experiments in reduced gravity could open new perspectives of investigation methods and give scientists an impressive potential for a future technology and multidisciplinary applications on different research fields like Fundamental Physics, Astrophysics, Fluid Dynamics, Combus-tion, Material Science, Chemistry and Biology. Generally, realizing microgravity experiments at ZARM`s drop tower facility meet new requirements of the experimental hardware and may lead to some technical constraints in the setups. In any case the ZARM Drop Tower Operation and Service Company (ZARM FAB mbH) maintaining the drop tower facility is prepared to as-sist experimentalists by offering own air-conditioned laboratories, clean rooms, workshops and consulting engineers, as well as scientific personal. Furthermore, ZARM`s on-site apartment can be used for accommodations during the experiment campaigns. In terms of approaching drop tower experimenting, consulting of experimentalists is mandatory to successfully accomplish the pursued drop or catapult capsule experiment. For this purpose there will be a lot of expertise and help given by ZARM FAB mbH in strong cooperation to-gether with the experimentalists. However, in comparison to standard laboratory setups the drop or catapult capsule setup seems to be completely different at first view. While defining a

  20. Clad failure detection in G 3 - operational feedback; Detection de rupture de gaines G 3 - experience d'exploitation

    Energy Technology Data Exchange (ETDEWEB)

    Plisson, J [CEA Marcoule, Centre de Production de Plutonium, 30 (France)

    1964-07-01

    After briefly reviewing the role and the principles of clad failure detection, the author describes the working conditions and the conclusions reached after 4 years operation of this installation on the reactor G 3. He mentions also the modifications made to the original installation as well as the tests carried out and the experiments under way. (author) [French] Apres un rappel succinct du role et des principes de la detection de rupture de gaines, l'auteur fait un expose des conditions de fonctionnement et de l'experience tiree de 4 annees d'exploitation de cette installation sur le reacteur G 3. Il signale au passage les modifications apportees a l'installation d'origine, ainsi que les essais effectues, et les experiences en cours.

  1. A review of healthy condition for reactor operators of NPP

    International Nuclear Information System (INIS)

    Zhang Chi; Yang Di; Zhu Lixin; Zhou Limin

    2008-01-01

    Physical health is one of fundamental elements and the necessary qualification for holding operator license or senior operator license of a nuclear power plant issued by NNSA. Based upon requirements for healthy qualification of reactor operators in nuclear safety regulations and some new issued regulations, especially some involved national standard (GB), review direction, relevant contents and criteria were described, and some suggestions were provided in this paper. (authors)

  2. Risk management for operations of the LANL Critical Experiments Facility

    International Nuclear Information System (INIS)

    Paternoster, R.; Butterfield, K.

    1998-01-01

    The Los Alamos Critical Experiments Facility (LACEF) currently operates two burst reactors (Godiva-IV and Skua), one solution assembly [the Solution High-Energy Burst Assembly (SHEBA)], two fast-spectrum benchmark assemblies (Flattop and Big Ten), and five general-purpose remote assembly machines that may be configured with nuclear materials and assembled by remote control. Special nuclear materials storage vaults support these and other operations at the site. With this diverse set of operations, several approaches are possible in the analysis and management of risk. The most conservative approach would be to write a safety analysis report (SAR) for each assembly and experiment. A more cost-effective approach is to analyze the probability and consequences of several classes of operations representative of operations on each critical assembly machine and envelope the bounding case accidents. Although the neutron physics of these machines varies widely, the operations performed at LACEF fall into four operational modes: steady-state mode, approach-to-critical mode, prompt burst mode, and nuclear material operations, which can include critical assembly fuel loading. The operational sequences of each mode are very nearly identical, whether operated on one assembly machine or another. The use of an envelope approach to accident analysis is facilitated by the use of classes of operations and the use of bounding case consequence analysis. A simple fault tree analysis of operational modes helps resolve which operations are sensitive to human error and which are initiated by hardware of software failures. Where possible, these errors and failures are blocked by TSR LCOs. Future work will determine the probability of accidents with various initiators

  3. Review of D-T Experiments Relevant to Burning Plasma Issues

    International Nuclear Information System (INIS)

    Hawryluk, R.J.

    2001-01-01

    Progress in the performance of tokamak devices has enabled not only the production of significant bursts of fusion energy from deuterium-tritium (D-T) plasmas in the Tokamak Fusion Test Reactor (TFTR) and the Joint European Torus (JET) but, more importantly, the initial study of the physics of burning magnetically confined plasmas. The TFTR and JET, in conjunction with the worldwide fusion effort, have studied a broad range of topics including magnetohydrodynamic stability, transport, wave-particle interactions, the confinement of energetic particles, and plasma boundary interactions. The D-T experiments differ in three principal ways from previous experiments: isotope effects associated with the use of deuterium-tritium fuel, the presence of fusion-generated alpha particles, and technology issues associated with tritium handling and increased activation. The effect of deuterium-tritium fuel and the presence of alpha particles is reviewed and placed in the perspective of the much large r worldwide database using deuterium fuel and theoretical understanding. Both devices have contributed substantially to addressing the scientific and technical issues associated with burning plasmas. However, future burning plasma experiments will operate with larger ratios of alpha heating power to auxiliary power and will be able to access additional alpha-particle physics issues. The scientific opportunities for extending our understanding of burning plasmas beyond that provided by current experiments is described

  4. Review on experiments relating to primary containment vessel failure

    International Nuclear Information System (INIS)

    Suzuki, Hiroyuki; Okada, Hidetoshi; Uchida, Sunsuke; Naitoh, Masanori

    2015-01-01

    Experiments regarding failures of primary containment vessels (PCVs) are reviewed and remained issues to be investigated in the future are discussed. Experiments are categorized as those relating to criteria of PCV failures and to FP releases through breaches on PCV boundaries. In the experiments categorized as those relating to criteria of PCV failures, experiments with full-scale, scale models, and compounds used for sealing are surveyed. Experiments relating to an amount of radioactive fission products (FPs) trapped at breaches on PCV boundaries are also reviewed. As remained issues to be investigated in the future, two items are pointed out: Evaluating degradation behavior of PCV boundaries exposed to temperature and pressure from the failure onset criteria to far above them, and evaluating an amount of FPs trapped at breaches on PCV boundaries. (author)

  5. Radiological operating experience at FFTF [Fast Flux Test Facility

    International Nuclear Information System (INIS)

    Bunch, W.L.; Prevo, P.R.

    1986-11-01

    The Fast Flux Test Facility has been in operation for approximately five years, including about one thousand days of full power operation of the Fast Test Reactor. During that time the collective dose equivalents received by operating personnel have been about two orders of magnitude lower than those typically received at commercial light water reactors. No major contamination problems have been encountered in operating and maintaining the plant, and release of radioactive gas to the environment has been minimal and well below acceptable limits. All shields have performed satisfactorily. Experience to date indicates an apparent radiological superiority of liquid metal reactor systems over current light water plants

  6. Operational Experience from Solar Thermal Energy Projects

    Science.gov (United States)

    Cameron, C. P.

    1984-01-01

    Over the past few years, Sandia National Laboratories were involved in the design, construction, and operation of a number of DOE-sponsored solar thermal energy systems. Among the systems currently in operation are several industrial process heat projects and the Modular Industrial Solar Retrofit qualification test systems, all of which use parabolic troughs, and the Shenandoah Total Energy Project, which uses parabolic dishes. Operational experience has provided insight to both desirable and undesirable features of the designs of these systems. Features of these systems which are also relevant to the design of parabolic concentrator thermal electric systems are discussed. Other design features discussed are system control functions which were found to be especially convenient or effective, such as local concentrator controls, rainwash controls, and system response to changing isolation. Drive systems are also discussed with particular emphasis of the need for reliability and the usefulness of a manual drive capability.

  7. Operational experience from a large EPICS-based accelerator facility

    International Nuclear Information System (INIS)

    Ciarlette, D.J.; Gerig, R.

    1995-01-01

    The Advanced Photon Source (APS) at Argonne National Laboratory is a third-generation x-ray light source which uses the Experimental Physics and Industrial Control System (EPICS) to operate its linear accelerator, positron accumulator ring, booster synchrotron, and storage ring equipment. EPICS has been used at the APS since the beginning of installation and commissioning. Currently, EPICS controls approximately 100 VME crates containing over 100,000 process variables. With this complexity, the APS has had to review some of the methods originally employed and make changes as necessary. In addition, due to commissioning and operational needs, higher-level operator software needed to be created. EPICS has been flexible enough to allow this

  8. Operating experience with superconducting cavities at Jefferson Lab

    International Nuclear Information System (INIS)

    Reece, C.E.

    1998-01-01

    The CEBAF recirculating superconducting electron linac at Jefferson Lab is now in full operation supporting nuclear physics experiments in three target halls at up to 4.4 GeV. The 330 SRF cavities, operating at 2.0 K, continue to perform well above design specifications, and have accumulated over 8,000,000 operating cavity hours. The authors have to date no evidence of degradation of cavity performance. The SRF cavities have demonstrated excellent reliability. The one klystron per cavity design provides CEBAF with flexibility and redundancy for normal operations. Several techniques have been developed for establishing optimum operating conditions for the 330 independent systems. Operation of the cavities and control systems at the full design current of 1 mA has recently been achieved. The principal constraints on usable gradient for low current operations are (1) discharge at the cold ceramic rf window induced by electron field emission in cavities, (2) tuner controls, and (3) stability of the waveguide vacuum in the region between the warm and cold windows. Several cryomodules have been improved by application of rf helium processing while installed on the beamline

  9. Experiment operations plan for the MT-4 experiment in the NRU reactor

    International Nuclear Information System (INIS)

    Russcher, G.E.; Wilson, C.L.; Parchen, L.J.; Marshall, R.K.; Hesson, G.M.; Webb, B.J.; Freshley, M.D.

    1983-06-01

    A series of thermal-hydraulic and cladding materials deformation experiments were conducted using light-water reactor fuel bundles as part of the Pacific Northwest Laboratory Loss-of-Coolant Accident (LOCA) Simulation Program. This report is the formal operations plan for MT-4 - the fourth materials deformation experiment conducted in the National Research Universal (NRU) reactor, Chalk River, Ontario, Canada. A major objective of MT-4 was to simulate a pressurized water reactor LOCA that could induce fuel rod cladding deformation and rupture due to a short-term adiabatic transient and a peak fuel cladding temperature of 1200K (1700 0 F)

  10. Operating experience with gamma ray irradiators

    International Nuclear Information System (INIS)

    Fraser, F.M.; Ouwerkerk, T.

    1980-01-01

    The experience of Atomic Energy of Canada, Limited (AECL) with radioisotopes dates back to the mid-1940s when radium was marketed for medical purposes. Cobalt-60 came on the scene in 1949 and within a few years a thriving business in cancer teletherapy machines and research irradiators was developed. AECL's first full-scale cobalt-60 gamma ray sterilizer for medical products was installed in 1964. AECL now has over 50 plants and 30 million curies in service around the world. Sixteen years of design experience in cobalt-60 sources, radiation shielding, safety interlock systems, and source pass mechanisms have made gamma irradiators safe, reliable, and easy to operate. This proven technology is being applied in promising new fields such as sludge treatment and food preservation. Cesium-137 is expected to be extensively utilized as the gamma radiation source for these applications

  11. Operational stressors on physical performance in special operators and countermeasures to improve performance: a review of the literature.

    Science.gov (United States)

    O'Hara, Reginald; Henry, Amy; Serres, Jennifer; Russell, Dawn; Locke, Robert

    2014-01-01

    Military training in elite warfighters (e.g., U.S. Army Rangers, Navy SEALs, and U.S. Air Force Battlefield Airmen) is challenging and requires mental and physical capabilities that are akin to that of professional athletes. However, unlike professional athletes, the competitive arena is the battlefield, with winning and losing replaced by either life or death. The rigors of both physical training and prolonged deployments without adequate rest and food intake can compromise physical performance. Therefore, the primary purpose of this effort was to identify occupational stressors on the physical performance of Special Operators during training and while on missions. The secondary purpose was to suggest specific countermeasures to reduce or prevent significant decrements in physical performance and reduce musculoskeletal injuries. A search of the literature for 2000?2012 was performed using the Air Force Institute of Technology search engines (i.e., PubMed and ProQuest). There were 29 articles located and selected that specifically addressed the primary and secondary purposes of this literature review. The remaining 32 of 61 referenced articles were reviewed after initial review of the primary literature. This review indicates that operational stress (e.g., negative energy balance, high-energy expenditure, sleep deprivation, environmental extremes, heavy load carriage, etc.) associated with rigorous training and sustained operations negatively affects hormonal levels, lean muscle mass, and physical performance of Special Operators. The number of musculoskeletal injuries also increases as a result of these stressors. Commanders may use simple field tests to assess physical decrements before and during deployment to effectively plan for missions. Specific countermeasures for these known decrements are lacking in the scientific literature. Therefore, future researchers should focus on studying specific physical training programs, equipment, and other methods to

  12. Experiment on continuous operation of the Brazilian IEA-R1 research reactor

    International Nuclear Information System (INIS)

    Freitas Pintaud, M. de

    1994-01-01

    In order to increase the radioisotope production in the IEA-R1 research reactor at IPEN/CNEN-SP, it has been proposed a change in its operation regime from 8 hours per day and 5 days per week to continuous 48 hours per week. The necessary reactor parameters for this new operation regime were obtained through an experiment in which the reactor was for the first time operated in the new regime. This work presents the principal results from this experiment: xenon reactivity, new shutdown margins, and reactivity loss due to fuel burnup in the new operation regime. (author)

  13. Operating experience with nuclear power stations in Member States in 1997

    International Nuclear Information System (INIS)

    1998-12-01

    This report is twenty-ninth in the IAEA series of annual reports on operating experience with nuclear power stations in Member States. The report is a direct output from the Agency's Power Reactor Information System (PRIS), whose database contains all operating experience data published in Agency's operating experience annual reports published since 1971 and basic information on power reactors, including design data. According to the information available to the Agency at the end of 1997, there were 437 nuclear power reactors having a total capacity of 351795 MW(e). During 1997 three new reactors having total capacity of 3555 MW(e) were connected to the grid in France and the Republic of Korea. There were 36 nuclear power plants under construction in the world. Load, operation and availability factors are used as the basic performance factors. In addition to annual performance data and outage information, the report contains a historical summary of performance and outages during the lifetime of individual plants and five figures illustrating worldwide performance and statistical data

  14. Department of Energy Operational Readiness Review for the Waste Isolation Pilot Plant

    Energy Technology Data Exchange (ETDEWEB)

    None

    2016-12-01

    The U.S. Department of Energy (DOE) has completed an Operational Readiness Review (ORR) for the restart of Contact Handled (CH) waste emplacement at the Waste Isolation Pilot Plant (WIPP) located near Carlsbad, New Mexico. The ORR team assessed the readiness of Nuclear Waste Partnership, LLC (NWP) to manage and perform receipt through CH waste emplacement, and associated waste handling and management activities, including the ability of the National TRU Program (NTP) to evaluate the waste currently stored at the WIPP site against the revised and enhanced Waste Acceptance Criteria (WAC). Field work for this review began on November 14, 2015 and was completed on November 30, 2016. The DOE ORR was conducted in accordance with the Department of Energy Operational Readiness Review Implementation Plan for the Waste Isolation Pilot Plant, dated November 8, 2016, and DOE Order 425.1D, Verification of Readiness to Start Up or Restart Nuclear Facilities. The review activities included personnel interviews, record reviews, direct observation of operations and maintenance demonstrations, and observation of multiple operational and emergency drills/exercises. The DOE ORR also evaluated the adequacy of the contractor’s ORR (CORR) and the readiness of the DOE Carlsbad field Office (CBFO) to oversee the startup and execution of CH waste emplacement activities at the WIPP facility. The WIPP facility is categorized as a Hazard Category 2 DOE Nonreactor Nuclear Facility for all surface and Underground (UG) operations per DOE-STD-1027-92, Hazard Categorization and Accident Analysis Techniques for Compliance with DOE Order 5480.23, Nuclear Safety Analysis Reports. In addition, the WIPP experienced two events in February, 2014 that resulted in Accident Investigations being performed in accordance with the requirements of DOE Order 225.1B, Accident Investigations. Based upon the results of the accident investigations and hazard categorization of the facility, the team placed

  15. Overview - Defense Waste Processing Facility Operating Experience

    International Nuclear Information System (INIS)

    Norton, M.R.

    2002-01-01

    The Savannah River Site's Defense Waste Processing Facility (DWPF) near Aiken, SC is the world's largest radioactive waste vitrification facility. Radioactive operations began in March 1996 and over 1,000 canisters have been produced. This paper presents an overview of the DWPF process and a summary of recent facility operations and process improvements. These process improvements include efforts to extend the life of the DWPF melter, projects to increase facility throughput, initiatives to reduce the quantity of wastewater generated, improved remote decontamination capabilities, and improvements to remote canyon equipment to extend equipment life span. This paper also includes a review of a melt rate improvement program conducted by Savannah River Technology Center personnel. This program involved identifying the factors that impacted melt rate, conducting small scale testing of proposed process changes and developing a cost effective implementation plan

  16. Operating experiences with Neutron Overpower Trip Systems in Ontario Hydro's CANDU nuclear plants

    International Nuclear Information System (INIS)

    Hnik, J.; Kozak, J.

    1991-01-01

    Operating experiences with Neutron Over Power Trip (NOP) Systems in different Ontario Hydro CANDU nuclear power plants are discussed. Lessons learned from the system operation and their impact on design improvements are presented. Retrofitting of additional tools, such as Shutdown System Monitoring computers, to improve operator interaction with the system is described. Experiences with the reliability of some of the NOP system components is also discussed. Options for future enhancements of system performance and operability are identified. (author)

  17. The importance for nuclear safety of efficient feedback of operational experience

    International Nuclear Information System (INIS)

    1987-09-01

    Experience of practical operation is a valuable source of information for improving and optimizing the safety and reliability of nuclear power plants. Therefore it is essential to collect information on abnormal events occurring at plants during operation and on all deviations from normal performance by systems and personnel that could be precursors of accidents. For this purpose it is necessary to establish hierarchical systems to feedback operational safety experience at utility, national and international levels and to make these systems as effective as possible. The present report attempts to identify the safety objectives of these systems, to analyse the difficulties presently encountered and to suggest possible improvements

  18. Review of Quality Assurance in SKB's Repository Research Experiments

    International Nuclear Information System (INIS)

    Hicks, T.W.

    2007-01-01

    SKB is preparing licence applications for a spent nuclear fuel encapsulation plant and repository which will be supported by the SR-Site safety report. A separate safety report, SR-Can, has been produced by SKB in preparation for the SR-Site report. SKI is in the process of reviewing the SR-Can safety report. In preparation for this review, and with a view to building confidence in SKB's research activities and understanding SKB's handling of data and other information, SKI has examined SKB's application of QA measures in the management and conduct of repository research and development projects that support the SR-Can safety assessment. These preliminary investigations will serve to support the preparation of more detailed quality and technical audits of SKB's repository safety assessment after the submission of a licence application. SKI's approach to this QA review is based on the consideration of quality-affecting aspects of a selection of SKB's research and development activities. As part of this review, SKI identified the need to examine quality-related aspects of some of the many experiments and investigations that form part of SKB's repository research programme. This report presents the findings of such a review, focusing on experiments concerned with the properties and performance of the engineered barrier system. First, in order to establish a broad understanding of QA requirements for repository scientific investigations, QA procedures implemented in the management of research and development activities for the low-level radioactive waste repository near Drigg in the UK and the Waste Isolation Pilot Plant and Yucca Mountain repository projects in the US were studied. The QA procedures for experiments and tests undertaken in these projects were compared with those implemented by SKB. Key findings are: QA programmes have been implemented for each repository development programme in response to regulatory requirements. The need for regular audits of the

  19. International experiences in nursing education: a review of the literature.

    Science.gov (United States)

    Kulbok, Pamela A; Mitchell, Emma M; Glick, Doris F; Greiner, Doris

    2012-04-24

    Service learning and study abroad opportunities have become increasingly popular in nursing education in the past decade. The purpose of this systematic review was to explore existing literature concerning global health experiences in nursing education. Twenty-three empirical articles from 2003 to 2010 were reviewed, building upon existing reviews of international nursing education literature. Research on two-way exchange experiences and models for best practice were found to be lacking. While an array of countries were represented as the visiting or hosting side of the experience, few co-authors from host countries were found, particularly in literature originating from the U.S. The authors recommend that two-way exchange programs be evaluated to identify successful strategies and barriers to success. Ongoing evaluation of exchanges is necessary to ensure continued sustainable partnership and exchange in immersion experiences for nursing students.

  20. Operating experience with nuclear power plants 2013; Betriebserfahrungen mit Kernkraftwerken 2013

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    2014-07-01

    The VGB Technical Committee 'Nuclear Plant Operation' has been exchanging operating experience about nuclear power plants for more than 30 years. Plant operators from several European countries are participating in the exchange. A report is given on the operating results achieved in 2013, events important to plant safety, special and relevant repair, and retrofit measures from Belgium, Germany, Finland, the Netherlands, Switzerland, and Spain. (orig.)

  1. Assessment of LWR piping design loading based on plant operating experience

    International Nuclear Information System (INIS)

    Svensson, P.O.

    1980-08-01

    The objective of this study has been to: (1) identify current Light Water Reactor (LWR) piping design load parameters, (2) identify significant actual LWR piping loads from plant operating experience, (3) perform a comparison of these two sets of data and determine the significance of any differences, and (4) make an evaluation of the load representation in current LWR piping design practice, in view of plant operating experience with respect to piping behavior and response to loading

  2. Milligan-Morgan hemorrhoidectomy under local anesthesia - an old operation that stood the test of time. A single-team experience with 2,280 operations.

    Science.gov (United States)

    Argov, Samuel; Levandovsky, Olga; Yarhi, Danielle

    2012-07-01

    This study was carried out to evaluate the morbidity and efficacy of Milligan-Morgan (M&M) hemorrhoidectomy in comparison to novel techniques (e.g., hemorrhoidal artery ligation [HAL], stapler hemorrhoidopexy [PPH]). This is a retrospective review of a single-team experience with 2,280 M&M hemorrhoidectomy patients, with 1-12 years follow-up. All patients were operated upon in jack-knife position, using local anesthesia under light sedation in an ambulatory facility. This method allowed us to operate on 40 pregnant women. All operations were performed using simple, commercially available instruments. We found negligible morbidity, no mortality and a very efficient operation on long-term follow-up. The surgical literature is littered with dreadful complications and even mortality from stapled hemorrhoidopexy (Giordano et al., Dis Colon Rectum 51:1574-1576, 2008; Brown et al., Tech Coloproctol 11:357-358, 2007; Cipriani and Pescatori, Colorectal Dis 4:367-370, 2002; Mongardini et al., G Chir 26:275-277, 2005) and the inefficiency of Doppler HAL (Faucheron and Gangner, Dis Colon Rectum 51:945-949, 2008; Scheyer et al., Am J Surg, 191:89-93, 2006). In days of soaring medical expenditures, nobody will argue about the superiority of M&M hemorrhoidectomy as the cheapest operation available. In all aspects, M&M hemorrhoidectomy under local anesthesia beats its competitors in terms of morbidity, mortality, long-term efficiency and low cost.

  3. Review of modern double beta decay experiments

    Science.gov (United States)

    Barabash, A. S.

    2015-10-01

    The review of modern experiments on search and studying of double beta decay processes is done. Results of the most sensitive current experiments are discussed. The main attention is paid to EXO-200, KamLAND-Zen, GERDA-I and CUORE-0 experiments. Modern values of T1/2(2ν) and best present limits on neutrinoless double beta decay and double beta decay with Majoron emission are presented. Conservative limits on effective mass of a Majorana neutrino ( at the level of ˜ 0.01-0.1 eV are discussed.

  4. Constellation Mission Operation Working Group: ESMO Maneuver Planning Process Review

    Science.gov (United States)

    Moyer, Eric

    2015-01-01

    The Earth Science Mission Operation (ESMO) Project created an Independent Review Board to review our Conjunction Risk evaluation process and Maneuver Planning Process to identify improvements that safely manages mission conjunction risks, maintains ground track science requirements, and minimizes overall hours expended on High Interest Events (HIE). The Review Board is evaluating the current maneuver process which requires support by multiple groups. In the past year, there have been several changes to the processes although many prior and new concerns exist. This presentation will discuss maneuver process reviews and Board comments, ESMO assessment and path foward, ESMO future plans, recent changes and concerns.

  5. Methodological frontier in operational analysis for roundabouts: a review

    Directory of Open Access Journals (Sweden)

    Orazio Giuffre'

    2016-11-01

    Full Text Available Several studies and researches have shown that modern roundabouts are safe and effective as engineering countermeasures for traffic calming, and they are now widely used worldwide. The increasing use of roundabouts and, more recently, turbo and flower roundabouts, has induced a great variety of experiences in the field of intersection design, traffic safety and capacity modelling. As for unsignalized intersections which represent the starting point to extend knowledge about the operational analysis to roundabouts, the general situation in capacity estimation is still characterized by the discussion between gap acceptance models and empirical regression models. However, capacity modelling must contain both the analytical construction and then solution of the model, and the implementation of driver behavior. Thus, issues on a realistic modelling of driver behavior by the parameters that are included into the models are always of interest for practioners and analysts in transportation and road infrastructure engineering. Based on these considerations, this paper presents a literature review about the key methodological issues in the operational analysis of modern roundabouts. Focus is made on the aspects associated with the gap acceptance behavior, the derivation of the analytical-based models and the calculation of parameters included into the capacity equations, as well as steady state and non-steady state conditions and uncertainty in entry capacity estimation. At last, insights on future developments of the research in this field of investigation will be also outlined.

  6. IRS Guidelines: Joint IAEA/NEA International Reporting System for Operating Experience

    International Nuclear Information System (INIS)

    2010-01-01

    The International Reporting System for Operating Experience (IRS) is an international system jointly operated by the International Atomic Energy Agency (IAEA) and the OECD Nuclear Energy Agency (OECD/NEA). The fundamental objective of the IRS is to contribute to improving the safety of commercial nuclear power plants which are operated worldwide. This objective can be achieved by providing timely and detailed information on lessons learned from operating and construction experience at the international level. This information could be related to issues and events that are related to safety. The purpose of these guidelines is to describe the system and to give users the necessary background and guidance to enable them to produce IRS reports meeting a high standard of quality while retaining the effectiveness of the system expected by all Member States operating nuclear power plants. As this system is owned by the Member States, the IRS Guidelines have been developed and approved by the IRS National Co-ordinators with the assistance of both Secretariats (IAEA/NEA).

  7. Microwave tokamak experiment (MTX) first year of operation and future plans

    International Nuclear Information System (INIS)

    Jackson, M.C.

    1989-01-01

    The Microwave Tokamak Experiment (MTX) at Lawrence Livermore National Laboratory (LLNL) began plasma operations in November 1988, and our main goal is the study of electron-cyclotron heating (ECH) in plasma discharges. The MTX tokamak was relocated from the Massachusetts Institute of Technology (MIT), and we have re-created plasma parameters that are similar to those generated while the tokamak was at MIT. After stable ohmic operation was achieved, single-pulse FEL heating experiments began. During this phase, the FEL operated at low power levels on the way to its ultimate goal of 2 GW and 140 GHz with a 30-ns pulse length. We have developed a number of new diagnostics to measure these fast FEL pulses and the resulting plasma effects. In this paper, we present results that show the correlation of MTX data with MIT data, some of the operational modifications and procedures used, results to date from preliminary tokamak operations with the FEL, and our near-term operational plans. 7 refs., 8 figs., 1 tab

  8. Operational experience with Seibersdorf low-level incinerator

    International Nuclear Information System (INIS)

    Chalupa, G.

    1987-01-01

    This report contains information about an excess air incinerator which burned low level β and γ wastes (also α up to determined limits). The incinerator was started up in 1980 and it is clear that in a technical plant of such magnitude, some changes and alterations will be needed to be overcome according to the experiences of operation. This paper - after a short description of the incinerator plant itself - gives a summary of some of the operation and the changes which are made in the plant according to these facts. A partial redesign of the incinerator plant in the first half of 1985 resulted in a very satisfying new design, which proved its superiority during the runs in 1985 and 1986

  9. Columbia River System Operation Review final environmental impact statement. Appendix T: Comments and responses

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. This appendix documents the public and agency review of the SOR Draft EIS and how the SOR agencies used the review to formulate the FINAL EIS. The appendix includes a summary of the review process, a discussion of the nature of the comments, a list of all commentors, reproductions of comment letters, and responses to all comments. Changes in the EIS text in response to comments are noted in the responses

  10. Review of Current Experience on Intermediate Heat Exchanger (IHX) and A Recommended Code Approach

    Energy Technology Data Exchange (ETDEWEB)

    Duane Spencer; Kevin McCoy

    2010-02-02

    The purpose of the ASME/DOE Gen IV Task 7 Part I is to review the current experience on various high temperature reactor intermediate heat exchanger (IHX) concepts. There are several different IHX concepts that could be envisioned for HTR/VHTR applications in a range of temperature from 850C to 950C. The concepts that will be primarily discussed herein are: (1) Tubular Helical Coil Heat Exchanger (THCHE); (2) Plate-Stamped Heat Exchanger (PSHE); (3) Plate-Fin Heat Exchanger (PFHE); and (4) Plate-Machined Heat Exchanger (PMHE). The primary coolant of the NGNP is potentially subject to radioactive contamination by the core as well as contamination from the secondary loop fluid. To isolate the radioactivity to minimize radiation doses to personnel, and protect the primary circuit from contamination, intermediate heat exchangers (IHXs) have been proposed as a means for separating the primary circuit of the NGNP (Next Generation Nuclear Plant) or other process heat application from the remainder of the plant. This task will first review the different concepts of IHX that could be envisioned for HTR/VHTR applications in a range of temperature from 850 to 950 C. This will cover shell-and-tube and compact designs (including the platefin concept). The review will then discuss the maturity of the concepts in terms of design, fabricability and component testing (or feedback from experience when applicable). Particular attention will be paid to the feasibility of developing the IHX concepts for the NGNP with operation expected in 2018-2021. This report will also discuss material candidates for IHX applications and will discuss specific issues that will have to be addressed in the context of the HTR design (thermal aging, corrosion, creep, creep-fatigue, etc). Particular attention will be paid to specific issues associated with operation at the upper end of the creep regime.

  11. Review of Current Experience on Intermediate Heat Exchanger (IHX) and A Recommended Code Approach

    International Nuclear Information System (INIS)

    Spencer, Duane; McCoy, Kevin

    2010-01-01

    The purpose of the ASME/DOE Gen IV Task 7 Part I is to review the current experience on various high temperature reactor intermediate heat exchanger (IHX) concepts. There are several different IHX concepts that could be envisioned for HTR/VHTR applications in a range of temperature from 850C to 950C. The concepts that will be primarily discussed herein are: (1) Tubular Helical Coil Heat Exchanger (THCHE); (2) Plate-Stamped Heat Exchanger (PSHE); (3) Plate-Fin Heat Exchanger (PFHE); and (4) Plate-Machined Heat Exchanger (PMHE). The primary coolant of the NGNP is potentially subject to radioactive contamination by the core as well as contamination from the secondary loop fluid. To isolate the radioactivity to minimize radiation doses to personnel, and protect the primary circuit from contamination, intermediate heat exchangers (IHXs) have been proposed as a means for separating the primary circuit of the NGNP (Next Generation Nuclear Plant) or other process heat application from the remainder of the plant. This task will first review the different concepts of IHX that could be envisioned for HTR/VHTR applications in a range of temperature from 850 to 950 C. This will cover shell-and-tube and compact designs (including the platefin concept). The review will then discuss the maturity of the concepts in terms of design, fabricability and component testing (or feedback from experience when applicable). Particular attention will be paid to the feasibility of developing the IHX concepts for the NGNP with operation expected in 2018-2021. This report will also discuss material candidates for IHX applications and will discuss specific issues that will have to be addressed in the context of the HTR design (thermal aging, corrosion, creep, creep-fatigue, etc). Particular attention will be paid to specific issues associated with operation at the upper end of the creep regime.

  12. Operating Experience from Events Reported to the IAEA Incident Reporting System for Research Reactors

    International Nuclear Information System (INIS)

    2015-03-01

    Operating experience feedback is an effective mechanism in providing lessons learned from events and the associated corrective actions to prevent them, helping to improve safety at nuclear installations. The Incident Reporting System for Research Reactors (IRSRR), which is operated by the IAEA, is an important tool for international exchange of operating experience feedback for research reactors. The IRSRR reports contain information on events of safety significance with their root causes and lessons learned which help in reducing the occurrence of similar events at research reactors. To improve the effectiveness of the system, it is essential that national organizations demonstrate an appropriate interest for the timely reporting of events important to safety and share the information in the IRSRR database. At their biennial technical meetings, the IRSRR national coordinators recommended collecting the operating experience from the events reported to the IRSRR and disseminating it in an IAEA publication. This publication highlights the root causes, safety significance, lessons learned, corrective actions and the causal factors for the events reported to the IRSRR up to September 2014. The publication also contains relevant summary information on research reactor events from sources other than the IRSRR, operating experience feedback from the International Reporting System for Operating Experience considered relevant to research reactors, and a description of the elements of an operating experience programme as established by the IAEA safety standards. This publication will be of use to research reactor operating organizations, regulators and designers, and any other organizations or individuals involved in the safety of research reactors

  13. Operating System Concepts for Reconfigurable Computing: Review and Survey

    OpenAIRE

    Marcel Eckert; Dominik Meyer; Jan Haase; Bernd Klauer

    2016-01-01

    One of the key future challenges for reconfigurable computing is to enable higher design productivity and a more easy way to use reconfigurable computing systems for users that are unfamiliar with the underlying concepts. One way of doing this is to provide standardization and abstraction, usually supported and enforced by an operating system. This article gives historical review and a summary on ideas and key concepts to include reconfigurable computing aspects in operating systems. The arti...

  14. Operating experience with LAMPF main beam lines instrumentation and control system

    International Nuclear Information System (INIS)

    van Dyck, O.B.; Harvey, A.; Howard, H.H.; Roeder, D.L.

    1975-01-01

    Instrumentation and control (I and C) for the Los Alamos Clinton P. Anderson Meson Physics Facility (LAMPF) main beam line is based upon central computer control through remote stations which provide input and output to most devices. Operating experience shows that the ability of the computer to give high-quality graphical presentation of the measurements enhances operator performance and instrument usefulness. Experience also shows that operator efficiency degrades rapidly with increasing instrument response time, that is, with increasing delay between the time a control is changed and the result can be observed. For this reason, instrumentation upgrade includes speeding up data acquisition and display times to under 10 s. Similarly, television-viewed phosphors are being retained where possible since their instantaneous response is very useful. Other upgrading of the instrumentation system is planned to improve data accuracy, reliability, redundancy, and instrument radiation tolerance. Past experience is being applied in adding or relocating devices to simplify tuning procedures. (U.S.)

  15. 40 CFR 26.1603 - Operation of the Human Studies Review Board.

    Science.gov (United States)

    2010-07-01

    ... appropriate for the scientific and ethical review of human research, including research ethics, biostatistics... scientific and ethical aspects of research proposals and reports of completed research with human subjects... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Operation of the Human Studies Review...

  16. Nuclear power plant operating experience. Annual report, 1978

    International Nuclear Information System (INIS)

    Beebe, M.R.

    1979-12-01

    This report is the fifth in a series of reports issued annually that summarizes the operating experience of US nuclear power plants in commercial operation. Power generation statistics, plant outages, reportable occurrences, fuel element performance, occupational radiation exposure for each plant are presented. Summary highlights of these areas are discussed. The report includes 1978 data from 65 plants - 25 boiling water reactor plants and 40 pressurized water reactor plants. Discussion of radioactive effluents which has been a part of this report in previous years, has not been included in this issue because of late acquisition of data

  17. Operational experience of ATLAS SCT and Pixel Detector

    CERN Document Server

    Kocian, Martin; The ATLAS collaboration

    2017-01-01

    The ATLAS Inner Detector based on silicon sensors is consisting of a strip detector (SCT) and a pixel detector. It is the crucial component for vertexing and tracking in the ATLAS experiment. With the excellent performance of the LHC well beyond the original specification the silicon tracking detectors are facing substantial challenges in terms of data acquisition, radiation damage to the sensors, and SEUs in the readout ASICs. The approaches on how the detector systems cope with the demands of high luminosity operation while maintaining excellent performance through hardware upgrades, software and firmware algorithms, and operational settings, are presented.

  18. Analysis of operating experience of nuclear power plants

    International Nuclear Information System (INIS)

    Volta, G.; Amesz, J.; Mancini, G.

    1981-01-01

    The power reactors operating experience has been matter for studies at the Joint Research Centre of the C.E.C. with the aim of validating probabilistic analysis models and of setting up data banks concerning reliability, availability of components and systems and safety related events. The report shows problems encountered and solutions given to attain the goal. For what concerns validation, the need of more satisfactory models that could handle both the technical and the organizational aspects of an operating plant is shown. For what concerns the data banks the possibilities opened by a coherent international system of classification are underlined. (author)

  19. Corrosion in PWR steam generator tubes made of alloy 600TT: overview of operating experience, NDE and safety issues

    International Nuclear Information System (INIS)

    Curieres, I. de; Sollier, T.; Delaval, C.

    2015-01-01

    About 60 PWR plants worldwide are operating with steam generator tubes made of alloy 600TT, among which 27 are located in France. This alloy is susceptible to corrosion, both on the primary and secondary side in every fleet, though with different kinetics or extent. It is noteworthy that many of the primary side corrosion issues can be clearly explained by design or operating conditions. However, studies show that all the secondary side issues are much hardly explained by simple considerations. This paper will give an overview of the international operating experience of this alloy and indicate the associated controllability and safety-related issues. An emphasis will be put on the manufacturing, chemistry and specificities of the different fleets. The French situation will be reviewed in this frame. (authors)

  20. [Ethic review on clinical experiments of medical devices in medical institutions].

    Science.gov (United States)

    Shuai, Wanjun; Chao, Yong; Wang, Ning; Xu, Shining

    2011-07-01

    Clinical experiments are always used to evaluate the safety and validity of medical devices. The experiments have two types of clinical trying and testing. Ethic review must be done by the ethics committee of the medical department with the qualification of clinical research, and the approval must be made before the experiments. In order to ensure the safety and validity of clinical experiments of medical devices in medical institutions, the contents, process and approval criterions of the ethic review were analyzed and discussed.

  1. Operational experience feedback in the World Association of Nuclear Operators (WANO)

    International Nuclear Information System (INIS)

    Revuelta, Ramon

    2004-01-01

    Operators in high-risk industries need to be learning organisations, learning from themselves and from the others. This presentation will describe how the nuclear industry is dealing in an integrated manner with the feedback of operating experience (OE), both internal and external, to increase the safety and reliability of power plants; it will describe how it: - investigates events; - reports events and analyses trends; - shares information to prevent recurrence; - performs corrective action and training; - performs assessments to verify effectiveness. The plants have achieved great improvements in performance overall, and to improve further, the industry is evolving. Instead of just learning from past events (reactive) it is now focusing on lower level indications of problems (precursors) through low level events reporting, trending and analysis. A hallmark of the industry is its desire to be self-critical. Emphasis is placed on improving the bottom quartile performing plants

  2. Operating experience and radiation protection in RAPS-3 and 4 operations

    International Nuclear Information System (INIS)

    Khandelwal, Narendra; Dhakar, P.C.; Singh, G.K.; Gupta, Ashok

    2008-01-01

    Rajasthan Atomic Power Station (RAPS)-3 and 4 was designed and constructed using latest technological advancements in the field of nuclear energy. Operating experience of the station have taught many lessons and provided opportunities to take proactive corrective actions. Design modifications, effective implementation of radiological surveillance program and improvements in work culture have helped in achieving continual reduction in radiation exposures and effluent releases at the station. This paper discusses some of the modifications carried out at the station along with their radiological impacts. (author)

  3. The International Space Station: Operations and Assembly - Learning From Experiences - Past, Present, and Future

    Science.gov (United States)

    Fuller, Sean; Dillon, William F.

    2006-01-01

    As the Space Shuttle continues flight, construction and assembly of the International Space Station (ISS) carries on as the United States and our International Partners resume the building, and continue to carry on the daily operations, of this impressive and historical Earth-orbiting research facility. In his January 14, 2004, speech announcing a new vision for America s space program, President Bush ratified the United States commitment to completing construction of the ISS by 2010. Since the launch and joining of the first two elements in 1998, the ISS and the partnership have experienced and overcome many challenges to assembly and operations, along with accomplishing many impressive achievements and historical firsts. These experiences and achievements over time have shaped our strategy, planning, and expectations. The continual operation and assembly of ISS leads to new knowledge about the design, development and operation of systems and hardware that will be utilized in the development of new deep-space vehicles needed to fulfill the Vision for Exploration and to generate the data and information that will enable our programs to return to the Moon and continue on to Mars. This paper will provide an overview of the complexity of the ISS Program, including a historical review of the major assembly events and operational milestones of the program, along with the upcoming assembly plans and scheduled missions of the space shuttle flights and ISS Assembly sequence.

  4. HANARO operation experience in the year 2004

    International Nuclear Information System (INIS)

    Oh, Soo-Youl; Kim, Heonil; Cho, Yeong-Garp; Jun, Byung-Jin

    2006-01-01

    The experiences of the HANARO operation and maintenance in the year 2004 are presented in this article. The operation of HANARO, a 30 MW research reactor operated by the Korea Atomic Energy Research Institute (KAERI), aims at a safe and effective operation to enhance its utilization in various fields of scientific research and industry. Regardless of its importance of the routine operation, this article is devoted to rather unusual matters such as irregular maintenance events and incidents. Since the first criticality in 1995, it has been a long-cherished task to reach the designed power level of 30 MW from the temporarily approved 24 MW. By resolving the concern on the fuel integrity, the designed level could be licensed and, eventually, it was achieved last November. On the other hand, after its 9 years of operation, the mechanical integrity of the heavy water reflector tank was checked. The measurement of the vertical straightness of the tank inner shell indicated its integrity. Meanwhile, the HANARO fuel production facility was completed at the KAERI site, and it will begin to supply centrifugally atomized fuels, instead of conventional comminuted fuels, to HANARO shortly. There were several incidents in 2004, which have all been cleared, including a leak of heavy water, melting of a sample in an irradiation hole for the neutron activation analysis, and a condensation problem in a horizontal beam tube. The progress of and lessons from each incident are presented. The utilization of HANARO is expanding every year and the trend will also continue in 2005. The operation mode has been changed from an 18-day continuous operation and 10-day shutdown (18-10 mode) to the 23-12 mode since the end of 2004, and a further extension is planned to the 30-12 mode. Thanks to this extended operation term, an increased power level and, most importantly, a reliable operation, the HANARO is gaining more and more credit from the end users. (author)

  5. French experience in operating pressurized water reactor power stations. Ten years' operation of the Ardennes power station

    International Nuclear Information System (INIS)

    Teste du Bailler, A.; Vedrinne, J.F.

    1978-01-01

    In the paper the experience gained over ten years' operation of the Ardennes (Chooz) nuclear power station is summarized from the point of view of monitoring and control equipment. The reactor was the first pressurized water reactor to be installed in France; it is operated jointly by France and Belgium. The equipment, which in many cases consists of prototypes, was developed for industrial use and with the experience that has now been gained it is possible to evaluate its qualities and defects, the constraints which it imposes and the action that has to be taken in the future. (author)

  6. Safety related experience in FFTF startup and operation

    International Nuclear Information System (INIS)

    Peterson, R.E.; Halverson, T.G.; Daughtry, J.W.

    1982-06-01

    The Fast Flux Test Facility (FFTF) is a 400 MW(t) sodium cooled fast reactor operating at the Hanford Engineering Development Laboratory, Richland, Washington, to conduct fuels and materials testing in support of the US LMFBR program. Startup and initial power ascension testing of the facility involved a comprehensive series of readiness reviews and acceptance tests, many of which relate to the inherent safety of the plant. Included are physics measurements, natural circulation, integrated containment leakage, shielding effectiveness, fuel failure detection, and plant protection system tests. Described are the measurements taken to confirm the design safety margins upon which the operating authorization of the plant was based. These measurements demonstrate that large margins of safety are available in the FFTF design

  7. Licensing Support Experience of the BN-600 Operation

    International Nuclear Information System (INIS)

    Khrennikov, N.; Sintsov, A.

    2013-01-01

    License procedure - Main principle: • All works, including fatigue tests of new types of fuel, are carried out at the unit 3 Beloyarsk nuclear power plants with the BN-600 reactor with the justification of the regulatory body. • Justification procedure is standard for all power units and independent from the reactor types. • The regulatory body and independent experts or technical support organizations, which can be involved in this work by the regulatory body, review SAR, operational manuals and other operator documents. • Safety requirements (i.e. Federal rules and codes). The project and design documents shall meet safety requirements. • The technical and organizational measures for safety guarantee shall meet well-known results of the research investigations or shall be experimental validate

  8. Risk management for operations of the Los Alamos critical experiments facility

    International Nuclear Information System (INIS)

    Paternoster, R.; Butterfield, K.

    1998-01-01

    The Los Alamos Critical Experiments Facility (LACEF) currently operates two burst reactors (Godiva-IV and Skua), one solution assembly (SHEBA 2--Solution high-Energy Burst Assembly), two fast-spectrum benchmark assemblies (Flattop and Big Ten), and five general-purpose remote assembly machines which may be configured with nuclear materials and assembled by remote control. SNM storage vaults support these and other operations at the site. With this diverse set of operations, several approaches are possible in the analysis and management of risk. The most conservative approach would be to write a safety analysis report (SAR) for each assembly and experiment. A more cost-effective approach is to analyze the probability and consequences of several classes of operations representative of operations on each critical assembly machine and envelope the bounding case accidents. Although the neutron physics of these machines varies widely, the operations performed at LACEF fall into four operational modes: steady-state mode, approach-to-critical mode, prompt burst mode, and nuclear material operations which can include critical assembly fuel loading. The operational sequences of each mode are very nearly the same, whether operated on one assembly machine or another. The use of an envelope approach to accident analysis is facilitated by the use of classes of operations and the use of bounding case consequence analysis. A simple fault tree analysis of operational modes helps resolve which operations are sensitive to human error and which are initiated by hardware of software failures. Where possible, these errors and failures are blocked by TSR LCOs

  9. Operating experience with nuclear power stations in Member States in 2002

    International Nuclear Information System (INIS)

    2003-11-01

    This report is the thirty-fourth in the Agency's series of annual reports on operating experience with nuclear power stations in Member States. The report is a direct output from the Agency's Power Reactor Information System (PRIS), whose database contains all operating experience data published in the Agency's operating experience annual reports since 1971 and basic information on power reactors, including design data. It presents operating experience data for all worldwide nuclear power plants after starting commercial operation. The PRIS databank is available free of charge to IAEA Member States through its two services: PRIS-PC and MicroPRIS. The PRIS-PC allows direct access to the database via telephone lines or through the Internet. The MicroPRIS contains a subset of the PRIS database and is a personal computer version of PRIS data available on diskette in a form readily accessible by standard, commercially available personal computer packages. PRIS is also available in the Internet at http://www.iaea.org/programmes/a2. Load, operation and availability factors are used as the basic performance factors. Energy unavailability factors, separate for planned and unplanned unavailability, due either to causes in the plant or causes external to the plant, are used as a measure of energy lost through a unit not being available. However, some ambiguity remains in the operator reports of the unavailability data, resulting in inconsistencies in these factors. It is recognized that there is an inherent difficulty in reporting unavailability in energy with relation to a maximum capacity which may change several times during the year. In addition, there are different practices in reporting planned and unplanned unavailability among Member States. The unavailability factors in this report should therefore be used with caution. It should be noted that, for load, operation and unavailability factors, there might be differences between the data of this report and those

  10. LMFBR operational and experimental in-core local-fault experience, primarily with oxide fuel elements

    International Nuclear Information System (INIS)

    Warinner, D.K.

    Case-by-case reviews of selective world experience with severe local faults, particularly fuel failure and fuel degradation, are reviewed for two sodium-cooled thermal reactors, several LMFBRs, and LMFBR-fuels experiments. The review summarizes fuel-failure frequency and illustrates the results of the most damaging LMFBR local-fault experiences of the last 20 years beginning with BR-5 and including DFR, BOR-60, BR2's MFBS-and Mol-loops experiments, Fermi, KNK, Rapsodie, EBR-II, and TREAT-D2. Local-fault accommodation is demonstrated and a need to more thoroughly investigate delayed-neutron and gaseous-fission-product signals is highlighted in view of uranate formation, observed blockages, and slow fuel-element failure-propagation

  11. Regional co-operation in the nuclear field: The Nordic experience

    International Nuclear Information System (INIS)

    Marcus, F.R.

    1983-01-01

    Experience from 25 years of co-operation in the nuclear field between the Nordic countries is described. A pragmatic approach with a minimum of formalism is used. The co-operation takes place mainly through ''horizontal'' channels between corresponding bodies in the different countries - safety authorities, research institutions, electricity producers, etc. In addition, a ''vertical'' co-ordination between these different circles is accomplished through a Nordic Liaison Committee. The experience shows that valuable results can be obtained, mainly through rationalization and improved use of resources. Difficulties, which are inherent in international co-operation, can be reduced, provided that there is a strong political will, an efficient system to promote contacts, and a flexible financing scheme. Apart from the benefits obtained in each of the countries - whether or not it has its own nuclear power - particular advantages accrue when a ''Nordic group'' can present co-ordinated viewpoints on the international scene. (author)

  12. Radioactive Operations Committee Review of the Intermediate-Level Waste Evaporator Facility, Building 2531 February 17, 1972

    International Nuclear Information System (INIS)

    Liberman, B.; Brooksbank, R.E.

    1972-01-01

    A subcommittee of the Radioactive Operations Committee met with the Operators of the Intermediate Level Waste Evaporator Facility on February 17, 1972, to discuss the status of the facility and its operations since the review of October 7, 1970, and reported in ORNL-CF-70-11-12. This review was made to determine the status of the ILWEF since the last review, to discuss compliance with previously recommended changes, and to review any new items of safety significance. Several recommendations were made.

  13. The French Experience Regarding Peer Reviews to Improve the Safety and Security of Radioactive Sources

    International Nuclear Information System (INIS)

    Lachaume, J.-L.; Bélot, G.

    2015-01-01

    France has a 50 year history of control over radioactive sources. Convinced that peer reviews may be helpful to improve any regulatory system, France decided to experience a ‘full scope’ Integrated Regulatory Review Service mission in 2006 and its follow-up mission in 2009, including a review of the implementation of the Code of Conduct. The reviews, interviews and observations performed during these missions enabled the experts to have a thorough knowledge of the French system and to highlight its strengths and ways for improvements. Following these reviews, France decided to rely on its good practices, extend them as much as possible and to define, implement and address an action plan to improve its regulatory control over radioactive sources, while maintaining the prime responsibility on the operators. While good practices in the tracking of sources were maintained and slight evolutions were conducted in the safety regulations, licensing process, and inspection and enforcement actions, the major outcome of these reviews will obviously consist of the entrustment of the French Nuclear Safety Authority with the role of the regulatory authority for the security of radioactive sources and the implementation of dedicated provisions. (author)

  14. Impact of operating experience on design of civil structures - An overview

    Energy Technology Data Exchange (ETDEWEB)

    Tang, J H.K. [Ontario Hydro, Toronto, ON (Canada)

    1991-04-01

    During the past twenty years, Ontario Hydro has expanded its nuclear power to provide about one third of the electricity used in the province (coal and water powered stations provide the other two thirds). By 1992, the total installed capacity of nuclear generating stations in Ontario will further rise to over 14,000 MW. In common with other power plant design, the layout and structural design of civil facilities for a nuclear generating station are developed from consideration of functional, safety and operational requirements, as well as from past operating experience. Experience on structural performance in the sixteen units of Pickering and Bruce NGS's includes: piping and machinery vibrations, structural fatigue failures, and structural integrity due to extreme loadings not considered in the original design. The operating experience of Ontario Hydro's nuclear stations also indicates that civil structures are subjected to some degree of corrosion or degradation of certain elements similar to other mechanical components in a power station. This category of problems consists of concerns associated with thermal effects on concrete structures due to inoperative cooling system, cracking of concrete, and reliability of elastomeric seal materials at expansion joints of the containment envelop. This paper presents an overview of the operating problems and issues regarding changes in the licensing requirements related to civil structures and supporting systems of major mechanical components. The impact of these generic experience on the design of retrofits and new generating stations is also described in the paper.

  15. Impact of operating experience on design of civil structures - An overview

    International Nuclear Information System (INIS)

    Tang, J.H.K.

    1991-01-01

    During the past twenty years, Ontario Hydro has expanded its nuclear power to provide about one third of the electricity used in the province (coal and water powered stations provide the other two thirds). By 1992, the total installed capacity of nuclear generating stations in Ontario will further rise to over 14,000 MW. In common with other power plant design, the layout and structural design of civil facilities for a nuclear generating station are developed from consideration of functional, safety and operational requirements, as well as from past operating experience. Experience on structural performance in the sixteen units of Pickering and Bruce NGS's includes: piping and machinery vibrations, structural fatigue failures, and structural integrity due to extreme loadings not considered in the original design. The operating experience of Ontario Hydro's nuclear stations also indicates that civil structures are subjected to some degree of corrosion or degradation of certain elements similar to other mechanical components in a power station. This category of problems consists of concerns associated with thermal effects on concrete structures due to inoperative cooling system, cracking of concrete, and reliability of elastomeric seal materials at expansion joints of the containment envelop. This paper presents an overview of the operating problems and issues regarding changes in the licensing requirements related to civil structures and supporting systems of major mechanical components. The impact of these generic experience on the design of retrofits and new generating stations is also described in the paper

  16. From initial application to routine operation: Reviewing the Applications for Power Uprates

    International Nuclear Information System (INIS)

    Garis, Ninos; Skaanberg, Lars

    2007-01-01

    Current plans for power uprates in Swedish nuclear power plants will lead to significant increases in seven units and a lesser increase in one unit. To date SKI has received six applications, and two more are due in 2007. A power uprate process is initiated by the application to the Government by a licensee for approval to increase the thermal output of a reactor unit. This request is addressed to the Government and is forwarded to SKI for a preliminary safety review. The result of the review is then provided by SKI as a basis for a governmental decision. Six applications have been taken through the first stage of the process; of these, three have received governmental approval and three are currently awaiting a decision. If the licensee's application is approved by the Government, deeper analyses and studies are required in order to modify the plant and update the safety analysis report and the associated technical specifications. SKI reviews this material on a continuous basis prior to test and routine operation at the increased power level. There are four stages that require attention and review by SKI; 1. Review of the application to the Government for approval to operate at increased power levels, and preparation of a suitable answer. 2. Review and approval of the preliminary safety analysis report (PSAR) 3. Review and approval of the application for testing at the higher power level 4. Review and approval of routine operation at the higher power level. A thorough description of the handling of a power uprate process can be found in the SKI PM (SKI-PM 04:11) that is available on the SKI website (in Swedish)

  17. Early tracking would improve the operative experience of general surgery residents.

    Science.gov (United States)

    Stain, Steven C; Biester, Thomas W; Hanks, John B; Ashley, Stanley W; Valentine, R James; Bass, Barbara L; Buyske, Jo

    2010-09-01

    High surgical complexity and individual career goals has led most general surgery (GS) residents to pursue fellowship training, resulting in a shortage of surgeons who practice broad-based general surgery. We hypothesize that early tracking of residents would improve operative experience of residents planning to be general surgeons, and could foster greater interest and confidence in this career path. Surgical Operative Log data from GS and fellowship bound residents (FB) applying for the 2008 American Board of Surgery Qualifying Examination (QE) were used to construct a hypothetical training model with 6 months of early specialization (ESP) for FB residents in 4 specialties (cardiac, vascular, colorectal, pediatric); and presumed these cases would be available to GS residents within the same program. A total of 142 training programs had both FB residents (n = 237) and GS residents (n = 402), and represented 70% of all 2008 QE applicants. The mean numbers of operations by FB and GS residents were 1131 and 1091, respectively. There were a mean of 252 cases by FB residents in the chief year, theoretically making 126 cases available for each GS resident. In 9 defined categories, the hypothetical model would result in an increase in the 5-year operative experience of GS residents (mastectomy 6.5%; colectomy 22.8%; gastrectomy 23.4%; antireflux procedures 23.4%; pancreatic resection 37.4%; liver resection 29.3%; endocrine procedures 19.6%; trauma operations 13.3%; GI endoscopy 6.5%). The ESP model improves operative experience of GS residents, particularly for complex gastrointestinal procedures. The expansion of subspecialty ESP should be considered.

  18. Operation of the tokamak fusion test reactor tritium systems during initial tritium experiments

    International Nuclear Information System (INIS)

    Anderson, J.L.; Gentile, C.; Kalish, M.; Kamperschroer, J.; Kozub, T.; LaMarche, P.; Murray, H.; Nagy, A.; Raftopoulos, S.; Rossmassler, R.; Sissingh, R.; Swanson, J.; Tulipano, F.; Viola, M.; Voorhees, D.; Walters, R.T.

    1995-01-01

    The high power D-T experiments on the tokamak fusion test reactor (TFTR) at the Princeton Plasma Physics Laboratory commenced in November 1993. During initial operation of the tritium systems a number of start-up problems surfaced and had to be corrected. These were corrected through a series of system modifications and upgrades and by repair of failed or inadequate components. Even as these operational concerns were being addressed, the tritium systems continued to support D-T operations on the tokamak. During the first six months of D-T operations more than 107kCi of tritium were processed successfully by the tritium systems. D-T experiments conducted at TFTR during this period provided significant new data. Fusion power in excess of 9MW was achieved in May 1994. This paper describes some of the early start-up issues, and reports on the operation of the tritium system and the tritium tracking and accounting system during the early phase of TFTR D-T experiments. (orig.)

  19. Power-Cooling-Mismatch Test Series Test PCM-7. Experiment operating specifications

    International Nuclear Information System (INIS)

    Sparks, D.T.; Smith, R.H.; Stanley, C.J.

    1979-02-01

    The experiment operating specifications for the Power-Cooling-Mismatch (PCM) Test PCM-7 to be conducted in the Power Burst Facility are described. The PCM Test Series was designed on the basis of a parametric evaluation of fuel behavior response with cladding temperature, rod internal pressure, time in film boiling, and test rod power being the variable parameters. The test matrix, defined in the PCM Experiment Requirements Document (ERD), encompasses a wide range of situations extending from pre-CHF (critical heat flux) PCMs to long duration operation in stable film boiling leading to rod failure

  20. Lessons from feedback of safety operating experience for reactor physics

    International Nuclear Information System (INIS)

    Suchomel, J.; Rapavy, S.

    1999-01-01

    Analyses of events in WWER operations as a part of safety experience feedback provide a valuable source of lessons for reactor physics. Examples of events from Bohunice operation will be shown such as events with inadequate approach to criticality, positive reactivity insertions, expulsion of a control rod from shut-down reactor, problems with reactor protection system and control rods. (Authors)

  1. Development and Operational Experiences of the JT-60U Tokamak and Power Supplies

    International Nuclear Information System (INIS)

    Hosogane, N.; Ninomiya, H.; Matsukawa, M.; Ando, T.; Neyatani, Y.; Horiike, H.; Sakurai, S.; Masaki, K.; Yamamoto, M.; Kodama, K.; Sasajima, T.; Terakado, T.; Ohmori, S.; Ohmori, Y.; Okano, J.

    2002-01-01

    The design of the JT-60U tokamak, the configuration of the coil power supplies, and the operational experiences gained to date are reviewed. JT-60U is a large tokamak upgraded from the original JT-60 in order to obtain high plasma current, large plasma volume, and highly elongated divertor configurations. All components inside the toroidal magnetic field coils, such as vacuum vessel, poloidal magnetic field coils, divertor, etc., were modified. Various technologies and ideas were introduced to develop these components; for example, a multi-arc double skin wall structure for the vacuum vessel and a functional poloidal magnetic field coil system with taps for obtaining various plasma configurations. Furthermore, boron-carbide coated carbon fiber composite (CFC) tiles were used as divertor tiles to reduce erosion of carbon-base tiles. Later, a semiclosed divertor with pumps, for which cryo-panels originally used for NBI units were converted, was installed in the replacement of the open divertor. These development and operational results provide data for future tokamaks. Major failures experienced in the long operational period of JT-60U, such as water leakage from the toroidal magnetic field coil, fracture of carbon tiles, and breakdown of a filter capacitor, are described. As a maintenance issue for tokamaks using deuterium fueling gas, a method for reducing radiation exposure of in-vessel workers is described

  2. Demining Dogs in Colombia - A Review of Operational Challenges, Chemical Perspectives, and Practical Implications.

    Science.gov (United States)

    Prada, Paola A; Chávez Rodríguez, Mario

    2016-07-01

    Within the framework of an internal armed conflict in Colombia, the use of antipersonnel mines by revolutionary armed forces represents a strategic factor for these groups. Antipersonnel mines are used by these revolutionary forces as a mean to hinder the advancement of the national armed forces in the recovery of territory and to protect tactical natural resources and illegal economies within a given area. These antipersonnel mines and improvised explosive devices (IEDs) are not of industrial manufacturing, and have a variety of activating mechanisms as well as non-metal materials which make them difficult for successful detection. The Colombian experience strongly represents the current need for advanced research and development of effective field operations within its affected territory. Current efforts are focused on a more operational demining perspective in coca cultivation sites in charge of mobile squadrons of eradication (EMCAR) from the National Police of Colombia working towards a future humanitarian demining upon an eventual peace process. The objectives of this review are not only to highlight already existing mine detection methods, but present a special emphasis on the role of mine detection canine teams in the context of this humanitarian issue in Colombia. This review seeks to bring together a description of chemical interactions of the environment with respect to landmine odor signatures, as well as mine detection dog operational perspectives for this specific detection task. The aim is to highlight that given the limited knowledge on the subject, there is a research gap that needs to be attended in order to efficiently establish optimal operating conditions for the reliable performance of mine detection dogs in Colombian demining field applications. Copyright © 2016 The Chartered Society of Forensic Sciences. Published by Elsevier Ireland Ltd. All rights reserved.

  3. Physics operating experience and fuel management of RAPS-1

    International Nuclear Information System (INIS)

    Nakra, A.N.; Purandare, H.D.; Srinivasan, K.R.; Rastogi, B.P.

    1976-01-01

    Rajasthan Atomic Power Station Unit-1 achieved criticality on August 11, 1972. Thereafter the reactor was brought to power, in November, 1972. Due to non-availability of the depleted fuel, the loading of which was necessary to obtain full power to begin with, the core was loaded with all natural uranium fuel and only 70% of the full power could be achieved. During the reactor operation for the last three years, the reactor has seen more than one effective full power year and about 1400 fresh fuel bundles have been loaded in the core. The reactor was subjected to about 150 power cycles resulting in more than 30% variation in operating power level and about 10 fuel bundles have failed. For satisfactory fuel management and refuelling decisions, a three dimensional simulator TRIVENI was developed. This was extensively tested during the start-up experiments and was found to be a satisfactory tool for day to day operation of the plant. In this paper, a brief account of analysis of the start-up experiments, approach to full power, power distortions and flux peaking, fuel management service and analysis of the failed fuel data has been given. (author)

  4. Review on Islanding Operation of Distribution System with Distributed Generation

    DEFF Research Database (Denmark)

    Mahat, Pukar; Chen, Zhe; Bak-Jensen, Birgitte

    2011-01-01

    The growing environmental concern and various benefits of distributed generation (DG) have resulted in significant penetration of DG in many distribution systems worldwide. One of the major expected benefits of DG is the improvement in the reliability of power supply by supplying load during power...... outage by operating in an island mode. However, there are many challenges to overcome before islanding operation of a distribution system with DG can become a viable solution in future. This paper reviews some of the major challenges with islanding operation and explores some possible solutions...

  5. A Practical Review of Studies on Operator's Supervisory Monitoring Behavior

    International Nuclear Information System (INIS)

    Ha, Jun Su; Seong, Poong Hyun

    2009-01-01

    Correct situation awareness (SA) has been considered a crucial key to improving performance and reducing error in NPPs. There are a lot of information sources that should be monitored in NPPs, but operators have only limited capacity of attention and memory. Operators in NPPs selectively attend to important information sources to effectively develop SA when an abnormal or accidental situation occurs. Selective attention to important information sources is continued while maintaining SA as well. In this work, various models of operator's visual sampling behavior are reviewed for the use in human factors studies in NPPs

  6. Contributions of the European Operating Experience Feedback Project to Support Regulatory Bodies

    International Nuclear Information System (INIS)

    Heitsch, M.

    2016-01-01

    Operating Experience Feedback (OEF) is one of the ways of improving the nuclear safety of operating nuclear power plants. The EC-Clearinghouse initiative was set up in 2008 to support nuclear regulatory authorities of EU Member States, but also Technical Support Organizations, international organizations and the broader nuclear community, to enhance nuclear safety. The differing regulatory regimes in the EU member countries and a significant diversity of the nuclear power plant (NPP) designs have been a challenge in the establishment of the European Clearinghouse. The European Clearinghouse is organized as a Network operated by a Central Office located at the Institute for Energy and Transport (IET) which is part of Joint Research Centre (JRC) of the European Commission. It gathers 17 European regulatory authorities and 3 major European Technical Support organizations (TSO). The Clearinghouse aims at providing lessons learned, recommendations and best practices from operational experience of NPPs based on support and commitment from the EU nuclear regulatory authorities. One of the objectives of the European Clearinghouse is to establish European best practices for the assessment of unusual events in NPPs. The paper will present the main activities of the European Clearinghouse. These include: • Topical studies providing in-depth assessment of selected topics important for the safe operation of NPPs. Statistical tools help to identify interesting subjects for these studies; • Quarterly reports on operating experience; • Training courses in the field of root cause analysis and event investigation; • Development, maintenance and population of a database for storage of operating experience related information; • Collaboration with international organizations such as IAEA and OECD/NEA on all aspects of OEF. All activities of the Clearinghouse initiative focus on providing an added value for nuclear regulation. (author)

  7. Operating experience feedback from safety significant events at research reactors

    Energy Technology Data Exchange (ETDEWEB)

    Shokr, A.M. [Atomic Energy Authority, Abouzabal (Egypt). Egypt Second Research Reactor; Rao, D. [Bhabha Atomic Research Centre, Mumbai (India)

    2015-05-15

    Operating experience feedback is an effective mechanism to provide lessons learned from the events and the associated corrective actions to prevent recurrence of events, resulting in improving safety in the nuclear installations. This paper analyzes the events of safety significance that have been occurred at research reactors and discusses the root causes and lessons learned from these events. Insights from literature on events at research reactors and feedback from events at nuclear power plants that are relevant to research reactors are also presented along with discussions. The results of the analysis showed the importance of communication of safety information and exchange of operating experience are vital to prevent reoccurrences of events. The analysis showed also the need for continued attention to human factors and training of operating personnel, and the need for establishing systematic ageing management programmes of reactor facilities, and programmes for safety management of handling of nuclear fuel, core components, and experimental devices.

  8. Operating experience feedback from safety significant events at research reactors

    International Nuclear Information System (INIS)

    Shokr, A.M.

    2015-01-01

    Operating experience feedback is an effective mechanism to provide lessons learned from the events and the associated corrective actions to prevent recurrence of events, resulting in improving safety in the nuclear installations. This paper analyzes the events of safety significance that have been occurred at research reactors and discusses the root causes and lessons learned from these events. Insights from literature on events at research reactors and feedback from events at nuclear power plants that are relevant to research reactors are also presented along with discussions. The results of the analysis showed the importance of communication of safety information and exchange of operating experience are vital to prevent reoccurrences of events. The analysis showed also the need for continued attention to human factors and training of operating personnel, and the need for establishing systematic ageing management programmes of reactor facilities, and programmes for safety management of handling of nuclear fuel, core components, and experimental devices.

  9. Operational plans for life science payloads - From experiment selection through postflight reporting

    Science.gov (United States)

    Mccollum, G. W.; Nelson, W. G.; Wells, G. W.

    1976-01-01

    Key features of operational plans developed in a study of the Space Shuttle era life science payloads program are presented. The data describes the overall acquisition, staging, and integration of payload elements, as well as program implementation methods and mission support requirements. Five configurations were selected as representative payloads: (a) carry-on laboratories - medical emphasis experiments, (b) mini-laboratories - medical/biology experiments, (c) seven-day dedicated laboratories - medical/biology experiments, (d) 30-day dedicated laboratories - Regenerative Life Support Evaluation (RLSE) with selected life science experiments, and (e) Biomedical Experiments Scientific Satellite (BESS) - extended duration primate (Type I) and small vertebrate (Type II) missions. The recommended operational methods described in the paper are compared to the fundamental data which has been developed in the life science Spacelab Mission Simulation (SMS) test series. Areas assessed include crew training, experiment development and integration, testing, data-dissemination, organization interfaces, and principal investigator working relationships.

  10. Mortuary operations following mass fatality natural disasters: a review.

    Science.gov (United States)

    Anderson, Madelyn; Leditschke, Jodie; Bassed, Richard; Cordner, Stephen M; Drummer, Olaf H

    2017-03-01

    This is a critical review to discuss the best practice approaches to mortuary operations in preparation for and the response to natural, mass fatality, disaster events, as identified by a review of published articles. The Preferred Reporting Items for Systematic Reviews and Meta-Analysis Protocols (PRISMA-P) Statement guided the identification of potential articles to use in this critical review. Subsequent searches were also conducted to identify articles relating to heat wave, and flood mortality. All identified peer-reviewed studies published in English which discussed the preparation and response of mortuaries to mass fatality natural disasters occurring in developed countries were included. Using the PRISMA-P method of identifying articles, 18 articles were selected for inclusion in this review. Although there are numerous articles which describe the mortuary response to mass fatality incidents, few articles analyzed the response, or discussed the roles which supported and enabled the organization to undertake the task of identifying disaster victims. It is thus difficult to determine objectively if the actions and activities outlined in the articles represent best-practice.

  11. Experiment Operating Specification for the Semiscale MOD-2C feedwater and steam line break experiment series. Appendix S-FS-6 and 7

    International Nuclear Information System (INIS)

    Boucher, T.J.; Owca, W.A.

    1985-05-01

    This document is the Semiscale MOD-2C feedwater and steam line break experiment series Experiment Operating Specification Appendix for tests S-FS-6 and S-FS-7. Test S-FS-6 is the third test in the series and simulates a 100% break in a steam generator bottom feedwater line downstream of the check valve accompanied by compounding factors (such as check valve failure, loss-of-offsite power at SIS and SIS delayed until low steam generator pressure signal). The test is terminated after plant stabilization and recovery procedures including unaffected loop steam and feed, pressurizer heater operation, pressurizer auxiliary spray operation, and normal charging/letdown operation. Test S-FS-7 is the fourth test in the series and simulates a 14.3% break in a steam generator bottom feedwater line downstream of the check valve, accompanied by compounding factors. The test is terminated after plant stabilization procedures including unaffected loop steam and feed, pressurizer heater operation, and normal charging/letdown operation. The test was followed by an affected loop secondary refill after isolating the break. The Appendix contains information on the major fluid systems, initial experiment conditions, experiment boundary conditions, and sequence of experiment events. Also included is a discussion of the scaling criteria and philosophy used to develop the experiment initial and boundary conditions and system configuration

  12. Tevatron operational experiences

    International Nuclear Information System (INIS)

    Norris, B.L.; Theilacker, J.C.

    1989-02-01

    Fermilabs superconducting accelerator, the Tevatron has been operational for nearly six years. The history of its operation is presented. Several long shutdowns for superconducting dipole repairs are discussed. The dominant factor influencing the repair was conductor motion which fatigued the cable in the magnet ends. Borescoping and x-raying techniques were used to determine which magnet ends required repair. Detailed downtime logs were kept for each of the running periods. A discussion of the sources of downtime and a comparison for different operating modes is presented

  13. The Effects of Degraded Digital Instrumentation and Control Systems on Human-system Interfaces and Operator Performance: HFE Review Guidance and Technical Basis

    Energy Technology Data Exchange (ETDEWEB)

    O' Hara, J.M.; W. Gunther, G. Martinez-Guridi

    2010-02-26

    New and advanced reactors will use integrated digital instrumentation and control (I&C) systems to support operators in their monitoring and control functions. Even though digital systems are typically highly reliable, their potential for degradation or failure could significantly affect operator performance and, consequently, impact plant safety. The U.S. Nuclear Regulatory Commission (NRC) supported this research project to investigate the effects of degraded I&C systems on human performance and plant operations. The objective was to develop human factors engineering (HFE) review guidance addressing the detection and management of degraded digital I&C conditions by plant operators. We reviewed pertinent standards and guidelines, empirical studies, and plant operating experience. In addition, we conducted an evaluation of the potential effects of selected failure modes of the digital feedwater system on human-system interfaces (HSIs) and operator performance. The results indicated that I&C degradations are prevalent in plants employing digital systems and the overall effects on plant behavior can be significant, such as causing a reactor trip or causing equipment to operate unexpectedly. I&C degradations can impact the HSIs used by operators to monitor and control the plant. For example, sensor degradations can make displays difficult to interpret and can sometimes mislead operators by making it appear that a process disturbance has occurred. We used the information obtained as the technical basis upon which to develop HFE review guidance. The guidance addresses the treatment of degraded I&C conditions as part of the design process and the HSI features and functions that support operators to monitor I&C performance and manage I&C degradations when they occur. In addition, we identified topics for future research.

  14. Operational Experience with the ATLAS Pixel Detector

    CERN Document Server

    Djama, Fares; The ATLAS collaboration

    2017-01-01

    Run 2 of the LHC collider sets new challenges to track and vertex reconstruction because of its higher energy, pileup and luminosity. The ATLAS tracking performance relies critically on the Pixel Detector. Therefore, in view of Run 2, the ATLAS collaboration has constructed the first 4-layer pixel detector in Particle Physics by installing a new pixel layer, called Insertable B-Layer (IBL). Operational experience and performance of the 4-layer Pixel Detector during Run 2 are presented.

  15. International Experience in Upper Echelon Theory: Literature Review

    Directory of Open Access Journals (Sweden)

    Đerđa Dino

    2017-09-01

    Full Text Available Background: The international experience of top managers is an evolving research within the upper echelon theory; therefore this literature review summarizes everything made so far.

  16. Exploitation of the in-seam miner and operational experience

    Energy Technology Data Exchange (ETDEWEB)

    Wilson, W I.S.; Morris, A H

    1977-12-01

    The In-seam Miner started as an investigatory project at MRDE in 1969. Since that time it has passed through the classic development stages of design of prototype, surface trials, underground trials, modification, production of more machines, assessment of experience and then wider exploitation. At the present time well over 100 machines have been supplied to the National Coal Board. The original machine was hydraulically driven and all but five of the machines supplied to date are of this type. The variety of applications that the machine has found in the mining industry has caused derivative development to embrace machines of length varying from 12-ft centers to 44-ft centers, to work in seams ranging from 40 in. up to 68 in. The range of applications has included face drivages, stablehole operations, in-seam retreat roadways and dirt-absorbing headings. Five electrically driven machines are now coming onto the market and experience with them, though limited, is very encouraging. The paper concentrates on two major aspects of the overall development process: first, the management of exploitation; and second, some operational experience of the In-seam Miner in South Midlands area.

  17. Receiver Operating Characteristics (ROCs) in Recognition Memory: A Review

    Science.gov (United States)

    Yonelinas, Andrew P.; Parks, Colleen M.

    2007-01-01

    Receiver operating characteristic (ROC) analysis is being used increasingly to examine the memory processes underlying recognition memory. The authors discuss the methodological issues involved in conducting and analyzing ROC results, describe the various models that have been developed to account for these results, review the behavioral empirical…

  18. Training and qualification of nuclear power plant operators (4)

    International Nuclear Information System (INIS)

    Ohsuga, Y.

    2009-01-01

    Training center using the simulators, instructor training, training upgrade, deployment of digital control panel and review of training were described with overseas practice. Recently, nuclear power plant on-site simulators were also used for respective operator training. Operator teamwork training, training team performance upgrade, reflection of operating experiences in nuclear power plant accidents, development of training support equipments and management of training records were needed to review and upgrade training and qualification programs. (T. Tanaka)

  19. Recent experience of Almaraz NPP in operator training

    International Nuclear Information System (INIS)

    Sanchez Cabanero, J.G.; Gomez de la Torre, J.M.

    1994-01-01

    In recent years the nuclear industry has been paying special attention to boosting nuclear power plant operation. To this end, it has optimized its maintenance, engineering, safety, management and other systems, using the appropriate resources to achieve its target. Optimization of these systems required the allocation of new resources for training plant personnel. The activity of training, which hitherto dedicated most of its attention and resources to the operating area, now extends them to schooling required in other areas of the plant, with the aim of updating the skills and knowledge of personnel to deal with new needs which have arisen. Regulations at present cover the training and qualification of only personnel responsible for handling reactor or for directing plant operation activities and capable of evaluating the nature and magnitude of possible incidents, especially those causing radioactive emissions, and of personnel requiring knowledge and experience to guarantee effective protection of individuals, ie, operators, supervisors, and qualified radiological protection experts. However, it should be borne in mind that, in the future, the training of other plant personnel could also be subject to regulations. (Author)

  20. Quality Assurance Review of SKB's Copper Corrosion Experiments

    Energy Technology Data Exchange (ETDEWEB)

    Baldwin, Tamara D.; Hicks, Timothy W. (Galson Sciencies LTD. 5 Grosvenor House, Melton Road, Oakham (United Kingdom))

    2010-06-15

    SKB is preparing a license application for the construction of a final repository for spent nuclear fuel in Sweden. This application will be supported by the safety assessment SR-Site for the post-closure phase. The assessment of long-term safety is based on a broad range of experimental results from laboratory scale, intermediate scale and up to full scale experiments. It is essential that there is a satisfactory level of assurance that experiments have been carried out with sufficient quality, so that results can be considered to be reliable within the context of their use in safety assessment. The former named authority, SKI, has initiated a series of reviews of SKB's methods of quality assurance and their implementation. This quality assurance review is focused on the work of copper corrosion being conducted in at SKB's Hard Rock Laboratory (HRL) in Aespoe, LOT and Miniature canister (Minican) experiments. In order for the reviewers to get a broad understanding of the issue of copper corrosion both SKB reports as well as the viewpoint of MKG was collected prior to commencement of the actual review task. The purpose of this project is to assess SKB's quality assurance with the view of providing input for the preparation of the SR-Site safety assessment. This has been achieved by examination of the corrosion part of the LOT and Minican experiments using a check list, visits to the relevant facilities, and meetings with contractors and a few members of the SKB staff. The same approach for quality assurance reviews has been used earlier in similar review tasks. During the quality review of the selected projects, several QA- related issues of different degree of severity was noted by the reviewers. The most significant finding was that SKB has chosen to present only selected real-time corrosion monitoring data in TR-09-20. This was surprising and SSM expect that SKB will analyse the reason for this thoroughly. The reviewers also made other

  1. Vitrification operational experiences and lessons learned at the WVDP

    International Nuclear Information System (INIS)

    Hamel, W.F. Jr.; Sheridan, M.J.; Valenti, P.J.

    1997-01-01

    The Vitrification Facility (VF) at the West Valley Demonstration Project (WVDP) commenced full, high-level radioactive waste (HLW) processing activities in July 1996. The HLW consists of a blend of washed plutonium-uranium extraction (PUREX) sludge, neutralized thorium extraction (THOREX) waste, and cesium-loaded zeolite. The waste product is borosilicate glass contained in stainless steel canisters, sealed for eventual disposal in a federal repository. This paper discusses the WVDP vitrification process, focusing on operational experience and lessons learned during the first year of continuous, remote operation

  2. A review of experiments comparing systems of grazing management ...

    African Journals Online (AJOL)

    Experiments comparing different systems of grazing management on natural pastures in various parts of the world are reviewed. In experiments in which various rotational systems were tested against continuous grazing, fewer than half revealed pasture improvement relative to continuous grazing. In the majority of ...

  3. Operating experience of a sodium rig following the ingress of oil

    Energy Technology Data Exchange (ETDEWEB)

    Bell, A C; Mehew, R D; Robertson, C M [UKAEA, Dounreay, Thurso, Caithness, Scotland (United Kingdom)

    1980-05-01

    The experience of operating the Small Water Leak Rig at Dounreay in the two years following the ingress into the sodium of silicone oil from the pump is reported. The carbon penetration into the rig pipework has been monitored and has been found to agree with a diffusion model. The predictions based on this model have enabled an operating strategy to be determined to allow continued operation of the rig. (author)

  4. Operating experience of a sodium rig following the ingress of oil

    International Nuclear Information System (INIS)

    Bell, A.C.; Mehew, R.D.; Robertson, C.M.

    1980-01-01

    The experience of operating the Small Water Leak Rig at Dounreay in the two years following the ingress into the sodium of silicone oil from the pump is reported. The carbon penetration into the rig pipework has been monitored and has been found to agree with a diffusion model. The predictions based on this model have enabled an operating strategy to be determined to allow continued operation of the rig. (author)

  5. Selection of operations staff, qualifications and experience

    International Nuclear Information System (INIS)

    Gutmann, H.

    1977-01-01

    Requirements and suggestions have been made by authorities and various organisations in a number of countries which define necessary experience and training for the various groups of nuclear power plant personnel. For two countries, the USA and the FRG, a comparison has been made which shows that there is only a slight deviation, taking into account the different education systems. With the example of the Biblis nuclear power plant the training on the job is described. Especially the production or operation department is looked at in more detail. The training is split up into several parts: a general part, such as nuclear physics, reactor physics and engineering, reactor safety, radiation protection and so on and a plant related part, such as arrangement and mode of operation of the plant under normal and accident conditions, license conditions and so on. (orig.) [de

  6. Non-operative treatment of spontaneous spinal epidural hematomas: a review of the literature and a comparison with operative cases : a review of the literature and a comparison with operative cases

    NARCIS (Netherlands)

    Groen, R J M

    OBJECTIVE: To identify factors that favour spontaneous recovery in patients who suffered a spontaneous spinal epidural hematoma (SSEH). METHODS: The literature was reviewed regarding non-operative cases of SSEH (SSEH(cons)). Sixty-two cases from the literature and 2 of our own cases were collected,

  7. The general surgery chief resident operative experience: 23 years of national ACGME case logs.

    Science.gov (United States)

    Drake, Frederick Thurston; Horvath, Karen D; Goldin, Adam B; Gow, Kenneth W

    2013-09-01

    The chief resident (CR) year is a pivotal experience in surgical training. Changes in case volume and diversity may impact the educational quality of this important year. To evaluate changes in operative experience for general surgery CRs. Review of Accreditation Council for Graduate Medical Education case logs from 1989-1990 through 2011-2012 divided into 5 periods. Graduates in period 3 were the last to train with unrestricted work hours; those in period 4 were part of a transition period and trained under both systems; and those in period 5 trained fully under the 80-hour work week. Diversity of cases was assessed based on Accreditation Council for Graduate Medical Education defined categories. Total cases and defined categories were evaluated for changes over time. The average total CR case numbers have fallen (271 in period 1 vs 242 in period 5, P surgery training may be jeopardized by reduced case diversity. Chief resident cases are crucial in surgical training and educators should consider these findings as surgical training evolves.

  8. Interfacing system isolation experience review. Final report, August 1991

    International Nuclear Information System (INIS)

    1991-08-01

    A light water reactor power plant has auxiliary systems interconnected with the reactor coolant system that are not designed for reactor operating pressure. These principally include the shutdown heat removal systems and various emergency core cooling injection systems. There are multiple isolation valves that prevent rector vessel pressure from causing overpressurization in low pressure interfacing systems. Combinations of hardware failures or operational errors are necessary to expose these systems to overpressurization. This experience review provides insights regarding the risk that an auxiliary system might become over pressurized from the reactor system. While analyses show that for the pressures involved the probability of auxiliary system failure is low, the auxiliary system conceivably might fail outside of containment while the plant is at power. Such a potential event has come to be called an interfacing system loss of coolant accident (ISLOCA). This report provides a compilation of occurrences where valve leakage, valve failure, or valve mispositioning played a role in the ability to maintain interfacing system isolation. Seventeen U.S. BWR events, twenty three U.S. PWR events and one foreign event are discussed in the report. Eleven of the U.S. BWR events and ten U.S. PWR events are judged to relate directly to the so-called ISLOCA event in that they fulfilled one or more of the failures necessary to cause an ISLOCA. (author)

  9. Experiences of operation for Ikata Nuclear Power Station

    International Nuclear Information System (INIS)

    Kashimoto, Shigeyuki

    1979-01-01

    No. 1 plant in the Ikata Nuclear Power Station, Shikoku Electric Power Co., Inc., is a two-loop PWR unit with electric output of 566 MW, and it began the commercial operation on September 30, 1977, as the first nuclear power station in Shikoku. It is the 13th LWR and 7th PWR in Japan. The period of construction was 52 months since it had been started in June, 1973. During the period, it became the object of the first administrative litigation to seek the cancellation of permission to install the reactor, and it was subjected to the influence of the violent economical variation due to the oil shock, but it was completed as scheduled. After the start of operation, it continued the satisfactory operation, and generated about 2.35 billion KWh for 4300 operation hours. It achieved the rate of utilization of 96.7%. Since March 28, 1978, the first periodical inspection was carried out, and abnormality was not found in the reactor, the steam generator and the fuel at all. The period of inspection was 79 days and shorter than expected. The commercial operation was started again on June 14. The outline of the Ikata Nuclear Power Station, its state of operation, and the periodical inspection are reported. Very good results were able to be reported on the operation for one year, thanks to the valuable experiences offered by other electric power companies. (Kako, I.)

  10. Use of experience for the improvement of technical specifications for operation

    International Nuclear Information System (INIS)

    Schweitz, J.P.; Seveon, J.J.

    1987-11-01

    The lessons drawn from experience led EdF to define in 1980 a national specification standard, to be applied to the first standardized series of 900 MWe units and to be adapted to the later 1300 MWe units. This document is periodically revised, every two years or so, to take into account new trends in safety thinking and lessons learnt from operating experience. In this paper we present the main developments in the field of technical specifications, particularly: the definition of rules applicable in the event of unavailability of safety-related equipment, the integration of plant unit operating feedback for specifications optimization

  11. Implementation of Industry Experience at Nuclear Power Plant Krsko

    International Nuclear Information System (INIS)

    Heruc, Z.; Kavsek, D.

    2002-01-01

    Being a standalone comparatively small unit NPP Krsko has adopted a business philosophy to incorporate industry experience into its daily operations. The continuos and safe operation of the unit is supported through feedback from other utilities (lessons learned) and equipment vendors and manufacturers. A permanent proactive approach in monitoring the international nuclear technology practices, standards changes and improvements, and upon feasibility review, introducing them into processes and equipment upgrades, is applied. As a member of the most important international integrations, NPP Krsko has benefited from the opportunity of sharing its experience with others (World Association of Nuclear Operators -WANO, Institute of Nuclear Power Operations - INPO, International Atomic Energy Agency - IAEA, Nuclear Operations Maintenance Information Service - NOMIS, Nuclear Maintenance Experience Exchange - NUMEX, Electric Power Research Institute - EPRI, Westinghouse Owners Group - WOG, etc.). Voluntary activities and good practices related to safety are achieved by international missions (IAEA Assessment of Safety Significant Events Team - ASSET, IAEA Operational Safety Review Team - OSART, WANO Peer Review, International Commission for Independent Safety Analysis - ICISA) and operating experience exchange programs through international organizations. These missions are promoting the highest levels of excellence in nuclear power plant operation, maintenance and support. With time, the practices described in this paper presented themselves as most contributing to safe and reliable operation of our power plant and at the same time supporting cost optimization making it a viable and reliable source of electrical energy in the more and more deregulated market. (author)

  12. [The Nutritional Care Experience of a Post-Operative Periampullary Cancer Patient With Cachexia].

    Science.gov (United States)

    Liou, Yan-Ting; Chiang, Pin-Yi; Shun, Shiow-Ching

    2016-04-01

    Cachexia is one of the most widely overlooked of the syndromes that are experienced by cancer patients. This syndrome is especially prevalent among patients with gastroenterology tract cancer. Although the National Comprehensive Cancer Network (NCCN) issued palliative-care practice guidelines for cachexia in 2015, guidelines have yet to be issued for the clinical setting. The authors reviewed the literature and applied their clinical experience to create an approach for identifying the degree of cachexia in a post-operative patient with periampullary cancer. This approach assesses the nutritional status, physical status, laboratory results, and gastrointestinal system functions of the patient using the Cachexia Assessment Scale (CAS) and NCCN Practice Guidelines for Cachexia. The patient improved under nursing care with an increase in nutritional intake and physical activity facilitating their process of post-surgical physical recovery. The authors hope that this experience using the combined CAS-NCCN Practice Guidelines will help clinical caregivers better understand how to apply the relevant guidelines in clinical settings. The developed approach may help nurses assess the comprehensive nutrition status of patients and related factors in order to provide interventions that will decrease the progression of cachexia effectively and promote quality of life.

  13. Operating experiences since rise-to-power test in high temperature engineering test reactor (HTTR)

    International Nuclear Information System (INIS)

    Tochio, Daisuke; Watanabe, Shuji; Motegi, Toshihiro; Kawano, Shuichi; Kameyama, Yasuhiko; Sekita, Kenji; Kawasaki, Kozo

    2007-03-01

    The rise-to-power test of the High Temperature Engineering Test Reactor (HTTR) was actually started in April 2000. The rated thermal power of 30MW and the rated reactor outlet coolant temperature of 850degC were achieved in the middle of Dec. 2001. After that, the reactor thermal power of 30MW and the reactor outlet coolant temperature of 950degC were achieved in the final rise-to-power test in April 2004. After receiving the operation licensing at 850degC, the safety demonstration tests have conducted to demonstrate inherent safety features of the HTGRs as well as to obtain the core and plant transient data for validation of safety analysis codes and for establishment of safety design and evaluation technologies. This paper summarizes the HTTR operating experiences for six years from start of the rise-to-power test that are categorized into (1) Operating experiences related to advanced gas-cooled reactor design, (2) Operating experiences for improvement of the performance, (3) Operating experiences due to fail of system and components. (author)

  14. Operating experience with BWR nuclear power

    International Nuclear Information System (INIS)

    Bonsdorf, Magnus von.

    1986-01-01

    The two-unit nuclear power station in Olkiluoto on the western coast of Finland produces about 20 per cent of the electricity consumption of the country. The first unit, TVO-I was first connected to the national grid in September 1978 and TVO-II in February 1980. The original rated power output of each unit was 660 MWe, corresponding to the thermal power of 2000 MW from the reactor. Technical modifications allowed the power to be uprated by 8%. The operating statistics (load factors etc.) are given and the outage experience discussed. The radiological history shows very low radioactivity and dose levels have been maintained at the plant. (UK)

  15. Stochastic Methods Applied to Power System Operations with Renewable Energy: A Review

    Energy Technology Data Exchange (ETDEWEB)

    Zhou, Z. [Argonne National Lab. (ANL), Argonne, IL (United States); Liu, C. [Argonne National Lab. (ANL), Argonne, IL (United States); Electric Reliability Council of Texas (ERCOT), Austin, TX (United States); Botterud, A. [Argonne National Lab. (ANL), Argonne, IL (United States)

    2016-08-01

    Renewable energy resources have been rapidly integrated into power systems in many parts of the world, contributing to a cleaner and more sustainable supply of electricity. Wind and solar resources also introduce new challenges for system operations and planning in terms of economics and reliability because of their variability and uncertainty. Operational strategies based on stochastic optimization have been developed recently to address these challenges. In general terms, these stochastic strategies either embed uncertainties into the scheduling formulations (e.g., the unit commitment [UC] problem) in probabilistic forms or develop more appropriate operating reserve strategies to take advantage of advanced forecasting techniques. Other approaches to address uncertainty are also proposed, where operational feasibility is ensured within an uncertainty set of forecasting intervals. In this report, a comprehensive review is conducted to present the state of the art through Spring 2015 in the area of stochastic methods applied to power system operations with high penetration of renewable energy. Chapters 1 and 2 give a brief introduction and overview of power system and electricity market operations, as well as the impact of renewable energy and how this impact is typically considered in modeling tools. Chapter 3 reviews relevant literature on operating reserves and specifically probabilistic methods to estimate the need for system reserve requirements. Chapter 4 looks at stochastic programming formulations of the UC and economic dispatch (ED) problems, highlighting benefits reported in the literature as well as recent industry developments. Chapter 5 briefly introduces alternative formulations of UC under uncertainty, such as robust, chance-constrained, and interval programming. Finally, in Chapter 6, we conclude with the main observations from our review and important directions for future work.

  16. Women's experiences during myocardial infarction: systematic review and meta-ethnography.

    Science.gov (United States)

    Madsen, Rikke; Birkelund, Regner

    2016-03-01

    The aim of this review is to identify, analyse and synthesise existing knowledge concerning female experiences during myocardial infarction. There is a lack of knowledge about women's experiences during myocardial infarction, and a meta-synthesis is needed to synthesise existing evidence. A systematic review and meta-ethnography. A systematic review was undertaken in September 2013. Four databases were searched. Grey literature and reference lists were screened for relevant studies. Four hundred and eighty-one papers were identified and 14 were included. The method of Noblit and Hare was used in the process of conducting this review and meta-ethnography. Three themes were identified. 1. 'Feeling the changes in my body', 2. 'Understanding the changes in my body' and 3. 'Acting on the changes in my body'. The majority of women did not experience their body changes as being severe and threatening. Therefore, the women chose to wait or self-medicate before consulting others. The women who initially experienced the symptoms related to myocardial infarction as being severe and threatening, chose to consult others earlier than the majority of women. Women's experiences and interpretation of body symptoms during myocardial infarction vary. Most commonly women do not initially recognise their body symptoms as being severe and life threatening. The theory of Merleau-Ponty's 'current and habituated body' is relevant for explaining women's ways of understanding and acting on their body changes during myocardial infarction. This review is relevant in a preventive and rehabilitating perspective for professionals working in health care. It helps professionals to understand women's experiences during myocardial infarction, optimises their ability to suspect myocardial infarction and teach women to react on these body changes. © 2016 John Wiley & Sons Ltd.

  17. Procedure for following external nuclear power plant operating experience

    International Nuclear Information System (INIS)

    Kostadinov, V.

    2003-01-01

    Slovenian Nuclear Safety Administration (SNSA) has developed computer database and the procedure for following-up and investigating external nuclear operating experience and administrative requirements. The SNSA's primary goal is to investigate safety significant events in due time, to analyze them from the regulatory point of view and to ensure that meaningful lessons be learned and used for improvement of the safe operation of Slovenian Nuclear Power Plant Krsko. Moreover, we intend to make uniform format and method for reporting broader spectrum of events analyzed including low level event reporting. (author)

  18. Operational readiness review implementation plan for K Basin sludge water system

    International Nuclear Information System (INIS)

    IRWIN, R.M.

    2003-01-01

    This Implementation Plan (IP) has been prepared consistent with the requirements of U.S. Department of Energy (DOE) Order 425.1B, ''Startup and Restart of Nuclear Facilities'', and DOE-STD-3006-2000, ''Planning and Conduct of Operational Readiness Reviews'' (ORR) (DOE 2002). The scope of the DOE ORR is described in the RL ''Plan of Action, K Basin Sludge Water System'' (Veitenheimer 2003), prepared by DOE project line management and approved by the RL Manager, the designated Approval Authority, on March 20, 2003. The scope of the contractor ORR is described in the contractor ''Plan of Action for the K Basins Sludge Water System Operational Readiness Review'' (FH 2002a) which was prepared by Spent Nuclear Fuel (SNF) Project line management and approved by the DOE Richland Operations Office (RL) Manager on December 19, 2002. DOE Order 425.1B indicates that the Secretarial Officer is the Authorization Authority when substantial modifications are made to a Hazard Category 2 nuclear facility. This Authorization Authority has been delegated to the RL Manager by memorandum from Jessie Hill Roberson, dated February 5, 2003 (Roberson 2003). This IP provides the overall approach and guidelines for performance of the DOE ORR. Appendix A contains the Criteria and Review Approach Documents (CRAD), which define the review objectives and criteria as well as the approach for assessing each objective. ORR results will be published in a final report, as discussed in Section 9.4

  19. Wet steam turbines for nuclear generating stations -design and operating experience

    International Nuclear Information System (INIS)

    Usher, J.

    1977-01-01

    Lecture to the Institution of Nuclear Engineers, 11 Jan. 1977. The object of this lecture was to give an account of some design features of large wet steam turbines and to show by describing some recent operational experience how their design concepts were fulfilled. Headings are as follows: effects of wet steam cycle on turbine layout and operation (H.P. turbine, L.P. turbine); turbine control and operation; water separators; and steam reheaters. (U.K.)

  20. Prolonged Operative Duration Increases Risk of Surgical Site Infections: A Systematic Review.

    Science.gov (United States)

    Cheng, Hang; Chen, Brian Po-Han; Soleas, Ireena M; Ferko, Nicole C; Cameron, Chris G; Hinoul, Piet

    The incidence of surgical site infection (SSI) across surgical procedures, specialties, and conditions is reported to vary from 0.1% to 50%. Operative duration is often cited as an independent and potentially modifiable risk factor for SSI. The objective of this systematic review was to provide an in-depth understanding of the relation between operating time and SSI. This review included 81 prospective and retrospective studies. Along with study design, likelihood of SSI, mean operative times, time thresholds, effect measures, confidence intervals, and p values were extracted. Three meta-analyses were conducted, whereby odds ratios were pooled by hourly operative time thresholds, increments of increasing operative time, and surgical specialty. Pooled analyses demonstrated that the association between extended operative time and SSI typically remained statistically significant, with close to twice the likelihood of SSI observed across various time thresholds. The likelihood of SSI increased with increasing time increments; for example, a 13%, 17%, and 37% increased likelihood for every 15 min, 30 min, and 60 min of surgery, respectively. On average, across various procedures, the mean operative time was approximately 30 min longer in patients with SSIs compared with those patients without. Prolonged operative time can increase the risk of SSI. Given the importance of SSIs on patient outcomes and health care economics, hospitals should focus efforts to reduce operative time.

  1. Earth-covered storage of LPG - Development, construction and operating experiences

    International Nuclear Information System (INIS)

    Schuldt, P.; Grote, G.

    1990-01-01

    The paper describes the planning, approval procedures, design, fabrication, site-assembling and the testing of liquefied petroleum gas storage tanks. The practical experience after three years of operation is reported. 8 figs

  2. Machine utilisation and operation experience with Jet from 1983

    International Nuclear Information System (INIS)

    Green, B.J.; Chuilon, P.; Noble, B.; Saunders, R.; Webberley, D.

    1989-01-01

    The operation of JET commenced in June 1983 and is scheduled until the end of 1992. This seemingly long period is actually quite limited when compared with the time needed to implement and commission the planned machine enhancements, and pursue research and developments which result from the experiments. There is an ever-present urgency to make the best use of the machine. 1983-84 was a learning period and only in 1985 was it felt worthwhile to adopt double-shift day working. Data has been compiled and analysed for utilisation of the machine, delays in terms of time lost and systems involved, and number and frequency of machine pulses. This paper presents an overall picture of machine availability and utilisation. It describes the JET operational arrangements and the experience of system faults. Finally, it draws conclusions and identifies lessons learned which may be relevant to the next stage of fusion power development

  3. Machine utilisation and operation experience with JET from 1983

    International Nuclear Information System (INIS)

    Green, B.J.; Chuilon, P.; Noble, B.; Saunders, R.; Webberley, D.

    1989-01-01

    The operation of JET commenced in June 1983 and is scheduled until the end of 1992. This seemingly long period is actually quite limited when compared with the time needed to implement and commission the planned machine enhancements, and pursue research and developments which result from the experiments. There is an ever-present urgency to make the use of the machine. 1983-84 was a learning period and only in 1985 was it felt worthwhile to adopt double-shift day working. Data has been compiled and analysed for utilisation of the machine, delays in terms of time lost and system involved, and number and frequency of machine pulses. This paper presents an overall picture of machine availability and utilisation. It describes the JET operational arrangements and the experience of system faults. Finally, it draws conclusions and identifies lessons learned which may be relevant to the next stage of fusion power development. (author). 9 figs

  4. Experience building and operating the CMS Tier-1 computing centres

    Science.gov (United States)

    Albert, M.; Bakken, J.; Bonacorsi, D.; Brew, C.; Charlot, C.; Huang, Chih-Hao; Colling, D.; Dumitrescu, C.; Fagan, D.; Fassi, F.; Fisk, I.; Flix, J.; Giacchetti, L.; Gomez-Ceballos, G.; Gowdy, S.; Grandi, C.; Gutsche, O.; Hahn, K.; Holzman, B.; Jackson, J.; Kreuzer, P.; Kuo, C. M.; Mason, D.; Pukhaeva, N.; Qin, G.; Quast, G.; Rossman, P.; Sartirana, A.; Scheurer, A.; Schott, G.; Shih, J.; Tader, P.; Thompson, R.; Tiradani, A.; Trunov, A.

    2010-04-01

    The CMS Collaboration relies on 7 globally distributed Tier-1 computing centres located at large universities and national laboratories for a second custodial copy of the CMS RAW data and primary copy of the simulated data, data serving capacity to Tier-2 centres for analysis, and the bulk of the reprocessing and event selection capacity in the experiment. The Tier-1 sites have a challenging role in CMS because they are expected to ingest and archive data from both CERN and regional Tier-2 centres, while they export data to a global mesh of Tier-2s at rates comparable to the raw export data rate from CERN. The combined capacity of the Tier-1 centres is more than twice the resources located at CERN and efficiently utilizing this large distributed resources represents a challenge. In this article we will discuss the experience building, operating, and utilizing the CMS Tier-1 computing centres. We will summarize the facility challenges at the Tier-1s including the stable operations of CMS services, the ability to scale to large numbers of processing requests and large volumes of data, and the ability to provide custodial storage and high performance data serving. We will also present the operations experience utilizing the distributed Tier-1 centres from a distance: transferring data, submitting data serving requests, and submitting batch processing requests.

  5. Experience building and operating the CMS Tier-1 computing centres

    International Nuclear Information System (INIS)

    Albert, M; Bakken, J; Huang, Chih-Hao; Dumitrescu, C; Fagan, D; Fisk, I; Giacchetti, L; Gutsche, O; Holzman, B; Bonacorsi, D; Grandi, C; Brew, C; Jackson, J; Charlot, C; Colling, D; Fassi, F; Flix, J; Gomez-Ceballos, G; Hahn, K; Gowdy, S

    2010-01-01

    The CMS Collaboration relies on 7 globally distributed Tier-1 computing centres located at large universities and national laboratories for a second custodial copy of the CMS RAW data and primary copy of the simulated data, data serving capacity to Tier-2 centres for analysis, and the bulk of the reprocessing and event selection capacity in the experiment. The Tier-1 sites have a challenging role in CMS because they are expected to ingest and archive data from both CERN and regional Tier-2 centres, while they export data to a global mesh of Tier-2s at rates comparable to the raw export data rate from CERN. The combined capacity of the Tier-1 centres is more than twice the resources located at CERN and efficiently utilizing this large distributed resources represents a challenge. In this article we will discuss the experience building, operating, and utilizing the CMS Tier-1 computing centres. We will summarize the facility challenges at the Tier-1s including the stable operations of CMS services, the ability to scale to large numbers of processing requests and large volumes of data, and the ability to provide custodial storage and high performance data serving. We will also present the operations experience utilizing the distributed Tier-1 centres from a distance: transferring data, submitting data serving requests, and submitting batch processing requests.

  6. Meaningful Experiences in Physical Education and Youth Sport: A Review of the Literature

    Science.gov (United States)

    Beni, Stephanie; Fletcher, Tim; Ní Chróinín, Déirdre

    2017-01-01

    The purpose of this research is to review the literature about young people's meaningful experiences in physical education and youth sport. We reviewed 50 empirical peer-reviewed articles published in English since 1987. Five themes were identified as central influences to young people's meaningful experiences in physical education and sport:…

  7. Technical Review of Operator's Destructive Analyses at the Rokkasho Reprocessing Plant: Strengthening the Transparency of the Operator's Measurement System

    International Nuclear Information System (INIS)

    Sato, N.; Katchi, T.; Niitsu, Y.; Duhamel, G.; Decaillon, J.-G.; Toervenyi, A.; Sayama, H.; Hara, S.

    2015-01-01

    The Rokkasho Reprocessing Plant is a large-scale nuclear facility in Japan. For the purposes of process control, product management and nuclear material accountancy for safeguards purposes, the laboratory of the facility operator analyzes thousands of samples from various process streams and with a multitude of matrices. Transparency of operational procedures, quality control measures and sample analytical results among the facility operator and state and international safeguards authorities are required to assess the facility operator's measurement system, and thus to assure a credible safeguards approach. The facility operator, Japan Nuclear Fuel, Limited (JNFL), is engaged in continuous improvement of its nuclear material analyzes. For the declarations to the inspectorates, it is important that JNFL and the safeguards authorities be able to confirm that the analytical methods used by JNFL are reliable and meet the latest version of the International Target Values. Since 2012 JNFL, the IAEA and the SSAC have carried out several technical reviews of the destructive analysis (DA) processes as a means of strengthening the transparency of the DA measurement systems. The goal of the DA technical reviews is to (1) assess past commitments of the JNFL plan for analytical improvement, (2) review the JNFL Quality System by means of documentation reviews and in-field demonstrations, and (3) review the analytical performance of the JNFL lab through its own results or from inter-laboratory comparison exercises. Throughout this process, subject-matter experts from all organizations met with JNFL laboratory staff and discussed analytical concerns and solutions. The outcome of these technical reviews was a series of recommendations to JNFL for strengthening its plan for continuous improvement. This paper presents the methodology of the DA technical reviews, the communication scheme and some examples of the outcome for JNFL to improve its DA methods and analytical

  8. Operation experiences with a 30 kV/100 MVA high temperature superconducting cable system

    International Nuclear Information System (INIS)

    Toennesen, Ole; Daeumling, Manfred; Jensen, Kim H; Kvorning, Svend; Olsen, Soeren K; Traeholt, Chresten; Veje, Erling; Willen, Dag; Oestergaard, Jacob

    2004-01-01

    A superconducting cable based on Bi-2223 tape technology has been developed, installed and operated in the public network of Copenhagen Energy in a two-year period between May 2001 and May 2003. This paper gives a brief overview of the system and analyses some of the operation experiences. The aim of this demonstration project is to gain experience with HTS cables under realistic conditions in a live distribution network. Approximately 50 000 utility customers have their electric power supplied through the HTS cable. The cable system has delivered 226 GW h of energy and reached a maximum operating current of 1157 A. The operation experiences include over-currents of 6 kA due to faults on peripheral lines, commissioning, servicing and failure responses on the cooling system, continuous 24 h, 7 day per week monitoring and performance of the alarm system. The implications of these experiences for the future applications of HTS cable systems are analysed

  9. The LHC test string first operational experience

    CERN Document Server

    Bézaguet, Alain-Arthur; Casas-Cubillos, J; Coull, L; Cruikshank, P; Dahlerup-Petersen, K; Faugeras, Paul E; Flemsæter, B; Guinaudeau, H; Hagedorn, Dietrich; Hilbert, B; Krainz, G; Kos, N; Lavielle, D; Lebrun, P; Leo, G; Mathewson, A G; Missiaen, D; Momal, F; Parma, Vittorio; Quesnel, Jean Pierre; Richter, D; Riddone, G; Rijllart, A; Rodríguez-Mateos, F; Rohmig, P; Saban, R I; Schmidt, R; Serio, L; Skiadelli, M; Suraci, A; Tavian, L; Walckiers, L; Wallén, E; Van Weelderen, R; Williams, L; McInturff, A

    1996-01-01

    CERN operates the first version of the LHC Test String which consists of one quadrupole and three 10-m twin aperture dipole magnets. An experimental programme aiming at the validation of the LHC systems started in February 1995. During this programme the string has been powered 100 times 35 of which at 12.4 kA or above. The experiments have yielded a number of results some of which, like quench recovery for cryogenics, have modified the design of subsystems of LHC. Others, like controlled helium leaks in the cold bore and quench propagation bewteen magnets, have given a better understanding on the evolution of the phenomena inside a string of superconducting magnets cooled at superfluid helium temperatures. Following the experimental programme, the string will be powered up and powered down in one hour cycles as a fatigue test of the structure thus simulating 20 years of operation of LHC.

  10. A Literature Review on the Experience of Long-Term Mental Illness.

    Science.gov (United States)

    Collier, Elizabeth; Grant, Maria J

    2018-06-01

    To illuminate long-term experiences of mental illness from both research and autobiographical accounts. A literature review of English-language papers, 1950-2014, relating to the experience of long-term mental illness indexed in AgeInfo, AMED, ASSIA, British Nursing Index (BNI), CINAHL, MEDLINE, PsycEXTRA, and PsychINFO. Twenty-five research papers and nine autobiographic accounts met the review criteria. Thematic analysis revealed nine themes: fear, explanation seeking, stigma, disability, coping strategies, control, support, change and learning, and life history. Specific gaps of note relate to age differences, acknowledgement of longevity of mental illnesses, and different cultural perspectives. Research Implications: There is an absence of longitudinal studies focused on experiences of long-term mental illness. The considerable length-of-time implicated in the experiences suggests that more individual life experience rather than illness focused studies are needed, enabling a holistic understanding. This includes studies from cultures other than the Western world. Greater transparency is needed in justifying age inclusions or passive exclusion of older peoples' perspectives. Knowledge of long-term mental illness experiences is of great importance to mental health practitioners. Evidence-based services cannot be provided if we do not have an holistic understanding of long-term mental illness. Social Implications: This review questions our ability to provide effective support for those experiencing long-term mental illness, in particular older people and different cultural perspectives. There appear to be no literature reviews that focus on the individual experience of long-term mental illness. It highlights the surprisingly small number of research studies available to inform mental health practitioners.

  11. The Effects of Degraded Digital Instrumentation and Control Systems on Human-system Interfaces and Operator Performance: HFE Review Guidance and Technical Basis

    International Nuclear Information System (INIS)

    O'Hara, J.M.; Gunther, W.; Martinez-Guridi, G.

    2010-01-01

    New and advanced reactors will use integrated digital instrumentation and control (I and C) systems to support operators in their monitoring and control functions. Even though digital systems are typically highly reliable, their potential for degradation or failure could significantly affect operator performance and, consequently, impact plant safety. The U.S. Nuclear Regulatory Commission (NRC) supported this research project to investigate the effects of degraded I and C systems on human performance and plant operations. The objective was to develop human factors engineering (HFE) review guidance addressing the detection and management of degraded digital I and C conditions by plant operators. We reviewed pertinent standards and guidelines, empirical studies, and plant operating experience. In addition, we conducted an evaluation of the potential effects of selected failure modes of the digital feedwater system on human-system interfaces (HSIs) and operator performance. The results indicated that I and C degradations are prevalent in plants employing digital systems and the overall effects on plant behavior can be significant, such as causing a reactor trip or causing equipment to operate unexpectedly. I and C degradations can impact the HSIs used by operators to monitor and control the plant. For example, sensor degradations can make displays difficult to interpret and can sometimes mislead operators by making it appear that a process disturbance has occurred. We used the information obtained as the technical basis upon which to develop HFE review guidance. The guidance addresses the treatment of degraded I and C conditions as part of the design process and the HSI features and functions that support operators to monitor I and C performance and manage I and C degradations when they occur. In addition, we identified topics for future research.

  12. [Screening of adverse childhood experiences in preschoolers: scoping review].

    Science.gov (United States)

    Vega-Arce, Maribel; Núñez-Ulloa, Gastón

    The aim of the present article was to describe available scientific publications detailing strategies and screening tools for Adverse Childhood Experiences in preschoolers (2 to 5 years of age). A scoping review of the topic was carried out through investigative articles published in peer review journals from January 1998 to June 2017 and indexed in seven international databases (Cochrane Library, EBSCO, PubMed, Science Direct, Springer, Web of Science and Scielo). The articles were selected based on predefined criteria, using limiters and manual screening. Twenty articles published between 1999 and 2017 were selected. The screening of adverse childhood experiences is performed through opportunistic recruitment in a professional context aimed at caregivers and children, which integrates training actions, application of screening tools and reception of identified cases. Screening tools differ between interviews and questionnaires. Furthermore, we report the periodicity of the screening, the behaviors and beliefs of the professionals against it and the barriers to its implementation. This review confirms that the screening of Adverse Childhood Experiences is an emerging topic in the research field. We emphasize the need to systematize and evaluate the strategies and tools for screening Adverse Childhood Experiences, as well as to develop local approaches to respond to the needs of children exposed to adversity. Copyright © 2017 Hospital Infantil de México Federico Gómez. Publicado por Masson Doyma México S.A. All rights reserved.

  13. Magnesio-thermic reduction of UF4 to uranium metal : plant operating experience

    International Nuclear Information System (INIS)

    Mayekar, S.V.; Singh, H.; Meghal, A.M.; Koppiker, K.S.

    1991-01-01

    Uranium Metal Plant has switched over from calcio-thermy to magnesio-thermy for production of uranium ingots. In this paper, the plant operating experience for magnesio-thermic reduction is described. Based on trials, the production has been stepped up from 40 kg ingots to 200 kg ingots. The operating parameters optimised include : heating schedule, UF 4 quality, magnesium quantity and quality, and particle size. The effect of quality of refractory lining has been discussed. Conditions for lining are optimised with regard to type of material used and size. Developmental work has also been carried out on use of pelletised charge and on use of graphite sleeves. Some experience in the machining of ingots for removal of surface slag is also discussed. Impurity problems, occasionally encountered, have been investigated and results are discussed. Based on the experience gained, specifications for operation have been laid down, and areas for further improvement are identified. (author). 5 refs., 1 fig., 1 tab

  14. Operational readiness review for the Waste Experimental Reduction Facility. Final report

    International Nuclear Information System (INIS)

    1993-11-01

    An Operational Readiness Review (ORR) at the Idaho National Engineering Laboratory's (INEL's) Waste Experimental Reduction Facility (WERF) was conducted by EG ampersand G Idaho, Inc., to verify the readiness of WERF to resume operations following a shutdown and modification period of more than two years. It is the conclusion of the ORR Team that, pending satisfactory resolution of all pre-startup findings, WERF has achieved readiness to resume unrestricted operations within the approved safety basis. ORR appraisal forms are included in this report

  15. Transferring Knowledge from Building Operation to Design: A literature review

    DEFF Research Database (Denmark)

    Rasmussen, Helle Lohmann; Jensen, Per Anker; Gregg, Jay Sterling

    . Knowing that the list lacks inputs from cultural and organizational theory, the paper suggests that further research should focus on taking these suggestions to an operational level for the benefit of FM, building clients and design teams. Furthermore, it is found that major concepts that could......As a solution to the previously identified gap between expected and actual building performance, this paper investigates how knowledge can be transferred from operation to design. This is assumed to help bridge the gap and increase the performance of new built facilities. By conducting a systematic...... literature review, it is found, that the theoretical approach in the reviewed articles has a significant impact on the level of how applicable the recommendations are in practice. Furthermore, a list of identified tools to enable knowledge transfer is provided, including POE, PPP and building commissioning...

  16. Operating experience with aluminum bearings at the Portsmouth Gaseous Diffusion Plant

    International Nuclear Information System (INIS)

    Langebrake, C.O.

    1975-01-01

    Considerable operating experience has been gained at the Portsmouth Gaseous Diffusion Plant over the last 15 years in the use of aluminum bearings in process related and auxiliary equipment. All of this experience has been excellent and, in several cases, the use of this type of bearing material has solved significant operating problems. Aluminum 850-T101 alloy was first used as a bearing material in purge cascade (PC-9) centrifugal compressors where a fatigue problem was being experienced with babbitt-type bearings. Good experience in this application led to the extended use of this bearing material in other equipment including process related as well as auxiliary equipment. Since 1961 aluminum bearings have been installed in approximately 21 Type PC-9 (centrifugal), 97 Type 9 (centrifugal), 262 Type X-29 (axial), and 101 Type 31 (axial) compressors, and 3 speed increasers in the X-330 Evacuation Booster Station. Based on successful operation of these bearings, continued and expanded use of aluminum bearings is recommended as a means of obtaining a high fatigue resistant bearing at a cost lower than that for babbitt-type bearings. (U.S.)

  17. Cluff Lake mill operations - a historical review

    International Nuclear Information System (INIS)

    Schnell, H.A.; Doell, E.; Corpus, E.

    2000-01-01

    The Cluff Lake operation started uranium production in 1980 and has produced over 50 million pounds of uranium since that time. The plant started with high grade ore (+30% U) processing and went through a series of modifications to its present operating status: Phase 1 - High-grade ore (+30% U) processing with acid leach and iron cake precipitation followed by direct yellowcake precipitation. Lower grade ore was concentrated in a gravity circuit to +30% U; Phase 1 1/2 - Reprocessing Phase 1 gravity tailings (+1% U) in an acid leach circuit with solvent extraction purification prior to yellowcake precipitation; Reprocessing of the Phase 1 leach tails (58 g/t Au) to recover gold in a Cyanide/CIP circuit followed by additional uranium recovery, and destruction and recycle of cyanide by volatilization; and Phase 2 - Treatment of the lower grade ore (0.5 to 1% U) at an increased tonnage with an acid leach, CCD, SX circuit as it is found in the existing plant. This paper will review the various processing circuits used during the phases of the Cluff Lake Mill from first uranium production to the present operation. (author)

  18. Women's experience of menopause: a systematic review of qualitative evidence.

    Science.gov (United States)

    Hoga, Luiza; Rodolpho, Juliana; Gonçalves, Bruna; Quirino, Bruna

    2015-09-16

    Evidence shows than an estimated one billion women have experienced menopause worldwide. The experience of menopause is influenced by beliefs and values prevalent in the sociocultural setting, the background of the women, and the ways in which the women approach changes in this phase of life. Independently of the circumstances involved, women experiencing menopause need to have their care needs and corresponding support identified based on their personal and contextual perspectives. Although it is essential to provide appropriate support to women experiencing menopause, no systematic reviews have so far been conducted that focus on menopause experienced by women worldwide. The objective of this review is to identify the best available evidence related to how women experience menopause worldwide. This review considered studies that included menopausal women aged between 40 and 65 years, who have lived the transition from reproductive years through menopause and beyond. This review included only studies whose participants have lived the experience of natural menopause. Women who have had induced menopause, or with premature menopause were excluded from this review. TYPES OF INTERVENTION(S)/PHENOMENA OF INTEREST: This review considered studies that investigate women's experiences of natural menopause under the scope of different social and cultural settings. TYPES OF STUDIES: This review considered studies that have a descriptive and interpretive approach, conducted using qualitative methodology. Qualitative studies that focus on program evaluation were excluded from this review. Qualitative data including, but not limited to, study designs such as phenomenology, grounded theory, ethnography, action research and feminist research were considered for inclusion in this review. TYPES OF OUTCOMES: This review considered studies that include the following outcome measures: all aspects related both directly and indirectly to the experience of menopause, as concretely lived

  19. Programmable DSP-based multi-bunch feedback--operational experience from six installations

    International Nuclear Information System (INIS)

    Fox, J.; Prabhakar, S.; Teytelman, D.; Young, A.; Stover, G.; Drago, A.; Serio, M.; Khan, S.; Knuth, T.; Kim, Y.; Park, M.

    2000-01-01

    A longitudinal instability control system, originally developed for the PEP-II, DAΦNE and ALS machines has in the last two years been commissioned for use at the PLS and BESSY-II light sources. All of the installations are running identical hardware and use a common software distribution package. This common structure is beneficial in sharing expertise among the labs, and allows rapid commissioning of each new installation based on well-understood diagnostic and operational techniques. While the installations share the common instability control system, there are significant differences in machine dynamics between the various colliders and light sources. These differences require careful specification of the feedback algorithm and system configuration at each installation to achieve good instability control and useful operational margins. This paper highlights some of the operational experience at each installation, using measurements from each facility to illustrate the challenges unique to each machine. Our experience on the opportunities and headaches of sharing development and operational expertise among labs on three continents is also offered

  20. Nuclear heat applications: design aspects and operating experience. Proceedings of four technical meetings held between December 1995 and April 1998

    International Nuclear Information System (INIS)

    1998-11-01

    Proven to be safe, reliable, economic and having minimum impact on the environment, nuclear energy is playing an important role in electricity generation producing 175 of the world's electricity. But since most of the world's energy consumption is in the form of heat the market for nuclear heat has already been recognised. Considering the growing experience in application of power reactors for district heating, industrial processes and water desalination IAEA is periodically reviewing progress and new developments of nuclear heat applications. This proceedings includes the papers presented at the following four meetings: Advisory group meeting and consultancy on experience with nuclear heat applications: district heating, process heat and desalination, 13-15 December 1995 and 7-9 february 1996; Advisory group meeting on technology, design and safety aspects of non-electrical application of nuclear energy, 20-24 October 1997; Advisory group meeting on operational modes of nuclear desalination plants, 3-5 November 1997; Advisory group meeting on materials and equipment for the coupling interfaces of nuclear reactors with desalination and district heating plants, 21-23 April 1998. It is structured according to the subject areas: (1) design an safety aspects of nuclear heat application, (2) operational and material aspects of nuclear heat application and (3) operational experience with nuclear heat application. Each paper is described by a separate abstract

  1. Columbia River system operation review. Final environmental impact statement

    International Nuclear Information System (INIS)

    1995-11-01

    The Columbia River and its tributaries are the primary water system in the Pacific Northwest, draining some 219,000 square miles in seven states and another 39,500 square miles in British Columbia. Beginning in the 1930's, the Columbia River has been significantly modified by construction of 30 major dams on the river and its tributaries, along with dozens of non-Federal projects. Construction and subsequent operation of these water development projects have contributed to eight primary uses of the river system, including navigation, flood control, irrigation, electric power generation, fish migration, fish and wildlife habitat, recreation, and water supply and quality considerations. Increasing stress on the water development of the Columbia River and its tributaries has led primary Federal agencies to undertake intensive analysis and evaluation of the operation of these projects. These agencies are the U.S. Army Corps of Engineers and the Bureau of Reclamation, who operate the large Federal dams on the river, and the Bonneville Power Administration who sells the power generated at the dams. This review, termed the System Operation Review (SOR), has as its ultimate goal to define a strategy for future operation of the major Columbia River projects which effectively considers the needs of all river uses. This volume, Appendix D: Cultural resources appendix, Technical imput includes the following: Development of geomorphology based framework for cultural resources management, Dworshak Reservoir, Idaho; Impact profiles for SOR reservoirs; comments from the following Native American tribes: Burns Paiute Tribe; Coville Confederated Tribes; Confederated Tribes of the Warm Springs Indian Reservation; Confederated Tribes and bands of the Yakama Indian Nation (comments); Nez Perce Tribe; Coeur D'Alene Tribe; Spokane Tribe of Indians; The confederated Tribes of the Umatilla Indian Reservation

  2. Safety aspects and operating experience of LWR plants in Japan

    International Nuclear Information System (INIS)

    Aoki, S.; Yoshioka, T.; Toyota, M.; Hinoki, M.

    1977-01-01

    To develop nuclear power generation for the future, it is necessary to put further emphasis on safety assurance and to endeavour to devise measures to improve plant availability, based on the careful analysis of causes that reduce plant availability. The paper discusses the results of studies on the following items from such viewpoints: (1) Safety and operating experience of LWR nuclear power plants in Japan: operating experience with LWRs; improvements in LWR design during the past ten years; analysis of the factors affecting plant availability; (2) Assurance of safety and measures to increase availability: measures for safety and environmental protection; measures to reduce radiation exposure of employees; appropriateness of maintenance and inspection work; measures to increase plant availability; measures to improve reliability of equipment and components; (3) Future technical problems. (author)

  3. CMS distributed analysis infrastructure and operations: experience with the first LHC data

    International Nuclear Information System (INIS)

    Vaandering, E W

    2011-01-01

    The CMS distributed analysis infrastructure represents a heterogeneous pool of resources distributed across several continents. The resources are harnessed using glite and glidein-based work load management systems (WMS). We provide the operational experience of the analysis workflows using CRAB-based servers interfaced with the underlying WMS. The automatized interaction of the server with the WMS provides a successful analysis workflow. We present the operational experience as well as methods used in CMS to analyze the LHC data. The interaction with CMS Run-registry for Run and luminosity block selections via CRAB is discussed. The variations of different workflows during the LHC data-taking period and the lessons drawn from this experience are also outlined.

  4. Plant operator performance evaluation based on cognitive process analysis experiment

    International Nuclear Information System (INIS)

    Ujita, H.; Fukuda, M.

    1990-01-01

    This paper reports on an experiment to clarify plant operators' cognitive processes that has been performed, to improve the man-machine interface which supports their diagnoses and decisions. The cognitive processes under abnormal conditions were evaluated by protocol analyses interviews, etc. in the experiment using a plant training simulator. A cognitive process model is represented by a stochastic network, based on Rasmussen's decision making model. Each node of the network corresponds to an element of the cognitive process, such as observation, interpretation, execution, etc. Some observations were obtained as follows, by comparison of Monte Carlo simulation results with the experiment results: A process to reconfirm the plant parameters after execution of a task and feedback paths from this process to the observation and the task definition of next task were observed. The feedback probability average and standard deviation should be determined for each incident type to explain correctly the individual differences in the cognitive processes. The tendency for the operator's cognitive level to change from skill-based to knowledge-based via rule-based behavior was observed during the feedback process

  5. C-Division annual review and operating plan, August 1990

    Energy Technology Data Exchange (ETDEWEB)

    Morse, N.R.

    1990-11-01

    The Computing and Communications Division is responsible for the Laboratory's Integrated Computing Network as well as Laboratory-wide communications. Our computing network, used by 8000 people distributed throughout the nation, constitutes one of the most powerful scientific computing facilities in the world. The purpose of this publication is to inform our clients of our strategic and operating plans. We review major accomplishments since early 1989 and describe our strategic planning goals and specific projects that will guide our operations over the next couple of years. Our mission statement, planning considerations, and management policies and practices are also included.

  6. Clinical Education Environment Experiences of Operating Room Students

    Directory of Open Access Journals (Sweden)

    Tahereh khazaei

    2016-01-01

    Full Text Available Background and purpose: The objective of medical education is to train competent and qualified workforce in order to provide services in various health environments. One of the important objectives of Operating Room students is to train workforce who can involve in patient’s health and recovery. Training these students should cause clinical ability and independent decision making during surgery. Since students during internship face with many problems, this study has been conducted to explore and describe the challenges and experiences.Methods: This qualitative study is a phenomenology that was conducted based on 20 students in the last semester of Operating Room associate’s degree with purposive sampling. Deep and semi-structured interviews were used to collect data and data were analyzed by content analysis method.Results: The findings in 5 main themes: (1 Physical space and equipment in the operating room, (2 The student’s position in operating room, (3 Integrating knowledge and action, (4 Managing education environment and 5- Student’s viewpoint about operating room and working in it.Conclusions: Interviews with students revealed the educational environment challenges with which they are faced during their study. Teachers can provide solutions to overcome the challenges and create a positive atmosphere for students' learning using results of this study and students may continue their interest in education and improve the quality of their education.Keywords: CLINICAL EDUCATION, OPERATING ROOM STUDENTS, CHALLENGE

  7. Young women's experiences of psychotic illness: a systematic review of qualitative research.

    Science.gov (United States)

    Chernomas, Wanda M; Rieger, Kendra L; Karpa, Jane V; Clarke, Diana E; Marchinko, Shelley; Demczuk, Lisa

    2017-03-01

    The relationship between young adulthood, women and psychosis was the focus for this systematic review. Age and gender are factors that can influence responses to illness. Research indicates that there are differences in how young men and women are affected biologically and psychosocially, including the presentation of a constellation of symptoms, response to anti-psychotic medications and how they assess their life circumstances. Yet in literature that examines experiences of young people with psychosis, the specific needs of young women are usually not presented separately. To better understand and address young adult women's healthcare and social service needs, a synthesis of evidence addressing the relationship between young adulthood, women and psychosis is needed. The aim of this systematic review was to synthesize the best available evidence on the experiences of young adult women (aged 18-35 years) living with a psychotic illness in the community. Specifically, the review question was:What are the experiences of young adult women living with a psychotic illness? Participants were young women between 18 and 35 years of age who were living with a psychotic illness in the community. The phenomenon of interest was the experiences of living with a psychotic illness of women aged 18-35 years in the community. Experiences were defined broadly as and inclusive of perceptions and experiences with health and social systems. The context for this review was the community setting. The current review included studies that focused on qualitative data including, but not limited to, designs such as phenomenology, grounded theory, ethnography, action research, feminist research and the qualitative component of mixed methods studies. A three-step search strategy was used to locate both published and unpublished studies. The search was limited to studies published from 1995 to the search date of May 13, 2015. Two reviewers independently appraised the nine included studies

  8. Long term operation of nuclear power plants – IAEA SALTO peer review service and its results

    Energy Technology Data Exchange (ETDEWEB)

    Krivanek, Robert, E-mail: r.krivanek@iaea.org

    2014-12-15

    Highlights: • SALTO peer review service is designed for reviewing of ageing management and NPPs’ preparedness LTO. • It has been established as an effective tool to review the compliance with IAEA safety standards. • The important issues for safe LTO are being identified by SALTO missions. • Analysis of those issues is provided in the paper. • This peer review service is strongly recommended for NPPs prior to entering LTO period. - Abstract: This paper presents main IAEA activities for safe long term operation (LTO) which includes establishment of IAEA Safety Standards and other LTO related documents, fostering information exchange and establishing databases and provision of SALTO (Safety Aspects of Long Term Operation) peer review service. This paper provides insights into IAEA SALTO peer review service objectives, scope and methodology. The SALTO peer review service was designed to assist nuclear power plant (NPP) operators in adopting a proper approach to LTO of their plants and in implementing complete and appropriate activities to ensure that plant safety will be maintained during the LTO period. The SALTO peer review service can also support regulators in establishing or improving regulatory and licensing strategies for LTO of NPPs. Issues derived from 19 SALTO missions and 2 LTO modules of OSART (Operational Safety Review Team) missions conducted during the period of 2005 to March 2014 are also analyzed in this paper.

  9. EBO feed water distribution system, experience gained from operation

    Energy Technology Data Exchange (ETDEWEB)

    Matal, O. [Energovyzkum, Brno (Switzerland); Schmidt, S.; Mihalik, M. [Atomove Elektrarne Bohunice, Jaslovske Bohunice (Switzerland)

    1997-12-31

    Advanced feed water distribution systems of the EBO design have been installed into steam generators at Units 3 and 4 of the NPP Jaslovske Bohunice (VVER 440). Experiences gained from the operation of steam generators with the advanced feed water distribution systems are discussed in the paper. (orig.). 4 refs.

  10. EBO feed water distribution system, experience gained from operation

    Energy Technology Data Exchange (ETDEWEB)

    Matal, O [Energovyzkum, Brno (Switzerland); Schmidt, S; Mihalik, M [Atomove Elektrarne Bohunice, Jaslovske Bohunice (Switzerland)

    1998-12-31

    Advanced feed water distribution systems of the EBO design have been installed into steam generators at Units 3 and 4 of the NPP Jaslovske Bohunice (VVER 440). Experiences gained from the operation of steam generators with the advanced feed water distribution systems are discussed in the paper. (orig.). 4 refs.

  11. Periodic safety review of operational nuclear power plants. A publication within the NUSS programme

    International Nuclear Information System (INIS)

    1994-01-01

    This Safety Guide which supplements the IAEA Safety Fundamentals: The Safety of Nuclear Installations and the Code on the Safety of Nuclear Power Plants: Operation, forms part of the Agency's programme, referred to as the NUSS programme, for establishing Codes and Guides relating to nuclear power plants. A list of NUSS publications is given at the end of this book. This Guide was drafted on the basis of a systematic review approach that was endorsed by the IAEA Conference on the Safety of Nuclear Power: Strategy for the Future. The purpose of this Safety Guide is to provide guidance on the conduct of Periodic Safety Reviews (PSRs) for an operational nuclear power plant. The Guide is directed at both owners/operators and regulators. This Safety Guide deals with the PSR of an operational nuclear power plant. A PSR is a comprehensive safety review addressing all important aspects of safety, carried out at regular intervals. 22 refs, 4 figs

  12. Operational Experience with a Cryogenic Axial-Centrifugal Compressor

    CERN Document Server

    Decker, L; Löhlein, K; Purtschert, W; Ziegler, B L; Lebrun, P; Tavian, L; Brunovsky, I; Tucek, L

    1998-01-01

    The Large Hadron Collider (LHC), presently under construction at CERN, requires large refrigeration capacity at 1.8 K. Compression of gaseous helium at cryogenic temperatures is therefore inevitable. Together with subcontractors, Linde Kryotechnik has developed a prototype machine. This unit is based on a cryogenic axial-centrifugal compressor, running on ceramic ball bearings and driven by a variable-frequency electrical motor operating at ambient temperature. Integrated in a test facility for superconducting magnets the machine has been commissioned without major problems and successfully gone through the acceptance test in autumn 1995. Subsequent steps were initiated to improve efficiency of this prototype. This paper describes operating experience gained so far and reports on measured performance prior to and after constructional modifications.

  13. Operational Experience with the ATLAS Pixel Detector

    CERN Document Server

    Djama, Fares; The ATLAS collaboration

    2017-01-01

    Run-2 of the LHC is providing new challenges to track and vertex reconstruction imposed by the higher collision energy, pileup and luminosity that are being delivered. The ATLAS tracking performance relies critically on the Pixel Detector, therefore, in view of Run-2 of LHC, the ATLAS experiment has constructed the first 4-layer Pixel detector in HEP, installing a new Pixel layer, also called Insertable B-Layer (IBL). Pixel detector was refurbished with a new service quarter panel to recover about 3% of defective modules lost during run-1 and an additional optical link per module was added to overcome in some layers the readout bandwidth limitation when LHC will exceed the nominal peak luminosity by almost a factor of 3. The key features and challenges met during the IBL project will be presented, as well as its operational experience and Pixel Detector performance in LHC.

  14. Operating System Concepts for Reconfigurable Computing: Review and Survey

    Directory of Open Access Journals (Sweden)

    Marcel Eckert

    2016-01-01

    Full Text Available One of the key future challenges for reconfigurable computing is to enable higher design productivity and a more easy way to use reconfigurable computing systems for users that are unfamiliar with the underlying concepts. One way of doing this is to provide standardization and abstraction, usually supported and enforced by an operating system. This article gives historical review and a summary on ideas and key concepts to include reconfigurable computing aspects in operating systems. The article also presents an overview on published and available operating systems targeting the area of reconfigurable computing. The purpose of this article is to identify and summarize common patterns among those systems that can be seen as de facto standard. Furthermore, open problems, not covered by these already available systems, are identified.

  15. Non-technical skills of the operating theatre scrub nurse: literature review.

    Science.gov (United States)

    Mitchell, Lucy; Flin, Rhona

    2008-07-01

    This paper is a report of a review to identify the non-technical (cognitive and social) skills used by scrub nurses. Recognition that failures in non-technical skills contributed to accidents in high-risk industries led to the development of research programmes to study the role of cognition and social interactions in operational safety. Recently, psychological research in operating theatres has revealed the importance of non-technical skills in safe and efficient performance. Most of the studies to date have focused on anaesthetists and surgeons. On-line sources and university library catalogues, publications of the Association for Perioperative Practice, National Association of Theatre Nurses and Association of Peri-Operative Registered Nurses were searched in 2007. Studies were included in the review if they presented data from scrub nurses on one or more of their non-technical skills. These findings were examined in relation to an existing medical non-technical skills framework with categories of communication, teamwork, leadership, situation awareness and decision-making. Of 424 publications retrieved, 13 were reviewed in detail. Ten concerned communication and eight of those also had data on teamwork. In 11 papers teamwork was examined, and one focused on nurses' situation awareness, teamwork and communication. None of the papers we reviewed examined leadership or decision-making by scrub nurses. Further work is needed to identify formally the non-technical skills which are important to the role of scrub nurse and then to design training in the identified non-technical skills during the education and development of scrub nurses.

  16. First experience in operating the population of the condition databases for the CMS experiment

    International Nuclear Information System (INIS)

    De Gruttola, Michele; Paolucci, Pierluigi; Di Guida, Salvatore; Glege, Frank; Innocente, Vincenzo; Schlatter, Dieter; Futyan, David; Govi, Giacomo; Pierro, Antonio

    2010-01-01

    Reliable population of the condition databases is critical for the correct operation of the online selection as well as of the offline reconstruction and analysis of data. We will describe here the system put in place in the CMS experiment to populate the database and make condition data promptly available both online for the high-level trigger and offline for reconstruction. The system, designed for high flexibility to cope with very different data sources, uses POOL-ORA technology in order to store data in an object format that best matches the object oriented paradigm for C++ programming language used in the CMS offline software. In order to ensure consistency among the various subdetectors, a dedicated package, PopCon (Populator of Condition Objects), is used to store data online. The data are then automatically streamed to the offline database hence immediately accessible offline worldwide. This mechanism was intensively used during 2008 in the test-runs with cosmic rays. The experience of this first months of operation will be discussed in detail.

  17. ATLAS Maintenance and Operation management system

    CERN Document Server

    Copy, B

    2007-01-01

    The maintenance and operation of the ATLAS detector will involve thousands of contributors from 170 physics institutes. Planning and coordinating the action of ATLAS members, ensuring their expertise is properly leveraged and that no parts of the detector are understaffed or overstaffed will be a challenging task. The ATLAS Maintenance and Operation application (referred to as Operation Task Planner inside the ATLAS experiment) offers a fluent web based interface that combines the flexibility and comfort of a desktop application, intuitive data visualization and navigation techniques, with a lightweight service oriented architecture. We will review the application, its usage within the ATLAS experiment, its underlying design and implementation.

  18. First operational experience with the LHC machine protection system when operating with beam energies beyond the 100MJ range

    CERN Document Server

    Assmann, R; Ferro-Luzzi, M; Goddard, B; Lamont, M; Schmidt, R; Siemko, A; Uythoven, J; Wenninger, J; Zerlauth, M

    2012-01-01

    The Large Hadron Collider (LHC) at CERN has made remarkable progress during 2011, surpassing its ambitious goal for the year in terms of luminosity delivered to the LHC experiments. This achievement was made possible by a progressive increase of beam intensities by more than 5 orders of magnitude during the first months of operation, reaching stored beam energies beyond the 100MJ range at the end of the year, less than a factor of 4 from the nominal design value. The correct functioning of the machine protection systems is vital during the different operational phases, for initial operation and even more when approaching nominal beam parameters where already a small fraction of the stored energy is sufficient to damage accelerator equipment or experiments in case of uncontrolled beam loss. Safe operation of the machine in presence of such high intensity proton beams is guaranteed by the interplay of many different systems: beam dumping system, beam interlocks, beam instrumentation, equipment monitoring, colli...

  19. Current operations and experiments at the Tritium Systems Test Assembly

    International Nuclear Information System (INIS)

    Bartlit, J.R.; Anderson, J.L.

    1985-01-01

    The Tritium Systems Test Assembly (TSTA) has continued to move toward operation of a fully-integrated, full-sized, computer-controlled fusion fuel processing loop. Concurrent, nonloop experiments have answered important questions on new components and issues such as palladium diffusion membranes, ceramic electrolysis cells, regenerable tritium getters, laser Raman spectroscopy, unregenerable tritium inventory on molecular sieves, tritium contamination problems and decontamination methods, and operating data on reliability, emissions, doses, and wastes generated. 4 refs., 2 figs

  20. The lived experiences of operating theatre scrub nurses learning technical scrub skills 'I'm doing this right, aren't I? Am I doing this right?'

    Science.gov (United States)

    Radford, Eleanor J; Fotis, Theo

    2018-01-01

    Operating theatre scrub nurses (OTSNs) are not required to have undertaken a secondary or specialist post-registration theatre qualification to work in the operating theatre (OT) setting in the UK. From the systematic review there is only very limited literature or research in how technical scrub skills are acquired. This study explores the lived experiences of OTSNs learning technical scrub skills. The study employed the qualitative methodology of interpretative phenomenological analysis. Data was collected from six participating OTSNs using semi-structured interviews. Four superordinate themes emerged: How technical scrub skills are established, Gatekeepers, How the learner feels whilst learning and, Reflections of the experienced scrub nurse. The study found that the experiences of OTSNs learning technical scrub skills are varied and a variety of teaching and learning methods are utilised. These experiences were influenced by the team, mentor and surgeon within the OT environment. Lived experiences were also influenced by organisational structure and service pressures within the NHS.

  1. Operating experiences with 1 MW steam generator

    Energy Technology Data Exchange (ETDEWEB)

    Sano, A; Kanamori, A; Tsuchiya, T

    1975-07-01

    1 MW steam generator, which was planned as the first stage of steam generator development in Power Reactor and Nuclear Fuel Corp. (PNC) in Japan, is a single-unit, once-through, integrated shell and tube type with multi-helical coil tubes. It was completed in Oarai Engineering Center of PNC in March of 1971, and the various performance tests were carried out up to April, 1972. After the dismantle of the steam generator for structural inspection and material test, it was restored with some improvements. In this second 1 MW steam generator, small leak occurred twice during normal operation. After repairing the failure, the same kind of performance tests as the first steam generator were conducted in order to verify the thermal insulation effect of argon gas in downcomer zone from March to June, 1974. In this paper the above operating experiences were presented including the outline of some performance test results. (author)

  2. Operational experience with the ATLAS Pixel Detector

    CERN Document Server

    Ince, T; The ATLAS collaboration

    2012-01-01

    The ATLAS Pixel Detector is the innermost element of the ATLAS experiment at the Large Hadron Collider at CERN, providing high-resolution measurements of charged particle tracks in the high radiation environment close to the collision region. This capability is vital for the identification and measurement of proper decay times of long-lived particles such as b-hadrons, and thus vital for the ATLAS physics program. The detector provides hermetic coverage with three cylindrical layers and three layers of forward and backward pixel detectors. It consists of approximately 80 million pixels that are individually read out via chips bump-bonded to 1744 n-in-n silicon substrates. In this paper, results from the successful operation of the Pixel Detector at the LHC will be presented, including monitoring, calibration procedures, timing optimization and detector performance. The detector performance is excellent: 96.2% of the pixels are operational, noise occupancy and hit efficiency exceed the design specification, an...

  3. Operational experience of the ATLAS Pixel detector

    CERN Document Server

    Hirschbuehl, D; The ATLAS collaboration

    2011-01-01

    The ATLAS Pixel Detector is the innermost detector of the ATLAS experiment at the Large Hadron Collider at CERN, providing high-resolution measurements of charged particle tracks in the high radiation environment close to the collision region. This capability is vital for the identification and measurement of proper decay times of long-lived particles such as b-hadrons, and thus vital for the ATLAS physics program. The detector provides hermetic coverage with three cylindrical layers and three layers of forward and backward pixel detectors. It consists of approximately 80 million pixels that are individually read out via chips bump-bonded to 1744 n-in-n silicon substrates. In this talk, results from the successful operation of the Pixel Detector at the LHC will be presented, including monitoring, calibration procedures, timing optimization and detector performance. The detector performance is excellent: 97,5% of the pixels are operational, noise occupancy and hit efficiency exceed the design specification, an...

  4. Operational experience of the ATLAS Pixel Detector

    CERN Document Server

    Marcisovsky, M; The ATLAS collaboration

    2011-01-01

    The ATLAS Pixel Detector is the innermost detector of the ATLAS experiment at the Large Hadron Collider at CERN, providing high-resolution measurements of charged particle tracks in the high radiation environment close to the collision region. This capability is vital for the identification and measurement of proper decay times of long-lived particles such as b-hadrons, and thus vital for the ATLAS physics program. The detector provides hermetic coverage with three cylindrical layers and three layers of forward and backward pixel detectors. It consists of approximately 80 million pixels that are individually read out via chips bump-bonded to 1744 n-in-n silicon substrates. In this talk, results from the successful operation of the Pixel Detector at the LHC will be presented, including monitoring, calibration procedures, timing optimization and detector performance. The detector performance is excellent: 97,5% of the pixels are operational, noise occupancy and hit efficiency exceed the design specification, an...

  5. Flight Technical Error Analysis of the SATS Higher Volume Operations Simulation and Flight Experiments

    Science.gov (United States)

    Williams, Daniel M.; Consiglio, Maria C.; Murdoch, Jennifer L.; Adams, Catherine H.

    2005-01-01

    This paper provides an analysis of Flight Technical Error (FTE) from recent SATS experiments, called the Higher Volume Operations (HVO) Simulation and Flight experiments, which NASA conducted to determine pilot acceptability of the HVO concept for normal operating conditions. Reported are FTE results from simulation and flight experiment data indicating the SATS HVO concept is viable and acceptable to low-time instrument rated pilots when compared with today s system (baseline). Described is the comparative FTE analysis of lateral, vertical, and airspeed deviations from the baseline and SATS HVO experimental flight procedures. Based on FTE analysis, all evaluation subjects, low-time instrument-rated pilots, flew the HVO procedures safely and proficiently in comparison to today s system. In all cases, the results of the flight experiment validated the results of the simulation experiment and confirm the utility of the simulation platform for comparative Human in the Loop (HITL) studies of SATS HVO and Baseline operations.

  6. Bohunice V-1. Review of safety upgrading and operating experiences

    International Nuclear Information System (INIS)

    Korec, J.; Kuschel, D.

    2000-01-01

    The Bohunice site in the Slovak Republic has two Russian-designed twin-unit nuclear power plants, one equipped with reactors of the WWER 440/230 type, the other with type WWER 440/213 reactors. Two older units (V-1) started commercial operation in late 1978 and 1980 respectively and have been supplying electricity to the national grid since that time without any events that could have degraded plant safety level. In the period prior to 1990 the utility Slovenske Elektrarne (S.E.) performed extensive modifications and upgrades to the original design of the two older units V-1 NPP. Furthermore, significant steps in safety improvement for Bohunice NPP V-1 have been made since 1990. Following the political restructuring of the former Czechoslovakia and the country's new open-door policy towards western organizations, several international expert missions were focused on evaluation of Bohunice NPP safety status level and operational reliability, particularly targeting the two older units. Based on recommendations of individual expert missions and complementary deterministic and probabilistic safety analyses performed by S.E., the Czechoslovak Nuclear Regulatory Authority issued the Resolution No. 5/91 defining 81 measures concerning further safety and reliability improvement of Bohunice V1 .A range of short-term and long-term upgrades was prioritised in terms of importance to plant safety and work to implement these measures commenced in the early nineties. During the 'Small Reconstruction' from 1991 to 1993 some of the short term upgrading measures were realized to eliminate the most serious safety deficits, thus to achieve a significant reduction in core damage frequency and a major improvement in confinement integrity. In this paper and presentation the goals of the gradual reconstruction project, basic engineering, detailed engineering and realization, last major stage of Unit 2 upgrade, as well as final stage of Unit 1 upgrade in early 2000 are presented

  7. EPRI (Electric Power Research Institute) operator reliability experiments program - Training implications

    International Nuclear Information System (INIS)

    Joksimovich, V.; Spurgin, A.J.; Orvis, D.D.; Moieni, P.; Worledge, D.H.

    1990-01-01

    The primary purpose of the EPRI Operator Reliability Experiments (ORE) Program is to collect data for use in reliability and safety studies of nuclear power plant operation to more realistically take credit for operator performance in preventing core damage. The two objectives for fulfilling this purpose are: (1) to obtain quantitative/qualitative performance data on operating crew responses in the control room for potential accident sequences by using plant simulators, and (2) to test the Human Cognitive Reliability (HCR) correlation. This paper briefly discusses the background to this program, data collection and analysis, the results and quantitative/qualitative insights stemming from phase one which might be of interest to simulator operators and trainers

  8. The operating experience and incident analysis for High Flux Engineering Test Reactor

    International Nuclear Information System (INIS)

    Zhao Guang

    1999-01-01

    The paper describes the incidents analysis for High Flux Engineering test reactor (HFETR) and introduces operating experience. Some suggestion have been made to reduce the incidents of HFETR. It is necessary to adopt new improvements which enhance the safety and reliability of operation. (author)

  9. The ALICE Data Quality Monitoring: qualitative and quantitative review of three years of operations

    International Nuclear Information System (INIS)

    Haller, Barthélémy von; Telesca, Adriana; Bellini, Francesca; Foka, Yiota

    2014-01-01

    ALICE (A Large Ion Collider Experiment) is a detector designed to study the physics of strongly interacting matter produced in heavy-ion collisions at the CERN Large Hadron Collider (LHC). Due to the complexity of ALICE in terms of number of detectors and performance requirements, Data Quality Monitoring (DQM) plays an essential role in providing online feedback on the data being recorded. It intends to provide shifters with precise and complete information to quickly identify problems, and as a consequence to ensure acquisition of high quality data. This paper presents a review of the ALICE DQM system during the first three years of LHC operations from a quantitative and qualitative point of view. We start by presenting the DQM software and tools before moving on to the various analyses carried out. An overview of the produced monitoring quantities is given, presenting the diversity of usage and flexibility of the DQM. Well-prepared shifters and experts, in addition to a precise organisation, were required to ensure smooth and successful operations. The description of the measures taken to ensure both aspects and an account of the DQM shifters' job are followed by a summary of the evolution of the system. We then give a quantitative review of the final setup of the system used during the whole year 2012. We conclude the paper with use cases where the DQM proved to be very valuable, scalable and efficient and with the plans for the coming years.

  10. Self-assessment on nuclear power plants operational experience feedback process

    International Nuclear Information System (INIS)

    Li Hongtao; Ding Ying

    2005-01-01

    This paper introduces the purpose and function of self-assessment conducted by the responsible organizations of nuclear power plants, and describes the methods and requirements of self-assessment on operational experience feedback process to give a example. (authors)

  11. Book Review "Advances on remote laboratories and e-learning experiences"

    Directory of Open Access Journals (Sweden)

    Jesús A. del Alamo

    2007-08-01

    Full Text Available Book Review "Advances on remote laboratories and e-learning experiences", book editors: Luís Gomes and Javier García-Zubía, University of Deusto, Spain. Reviewed by Jesús A. del Alamo, Massachusetts Institute of Technology, M.I.T.

  12. Children's experiences of dialysis: a systematic review of qualitative studies

    NARCIS (Netherlands)

    Tjaden, Lidwien; Tong, Allison; Henning, Paul; Groothoff, Jaap; Craig, Jonathan C.

    2012-01-01

    Objective To describe the experiences and perspectives of children and adolescents on dialysis. Design A systematic review of qualitative studies was conducted that explored the experiences of children on dialysis. Electronic databases and reference lists of relevant articles were searched to

  13. de Quervain's thyroiditis: A review of experience with surgery.

    Science.gov (United States)

    Ranganath, Rohit; Shaha, Manish A; Xu, Bin; Migliacci, Jocelyn; Ghossein, Ronald; Shaha, Ashok R

    de Quervain's thyroiditis is an inflammatory condition of the thyroid mostly treated medically, rarely requiring surgical treatment. We intend to review the surgical experience with de Quervain's thyroiditis at a tertiary cancer center over a period of 22years. A retrospective review of medical records from 1992 to 2014 at a tertiary cancer center was performed and all patients with a histopathological diagnosis of de Quervain's thyroiditis were included. Ten patients with a histopathological diagnosis of de Quervain's thyroiditis were included in the study. One patient in the study presented with dysphagia due to the goiter. The remaining patients presented with thyroid nodules. None presented with typical symptoms of the disease. Seven of the ten patients that had been evaluated for a goiter at an outside facility underwent fine needle aspiration cytology. Of the seven patients, one patient was suspected to have medullary carcinoma of the thyroid, two had follicular neoplasia, and the others had indeterminate nodules. Eight of the ten patients underwent surgery for suspected malignancy, with eight receiving a total thyroidectomy and two patients getting a thyroid lobectomy with isthmusectomy. Two patients had an abnormally hard gland to palpate during surgery with the others not having any suspicious findings. Seven of the ten of the patients had lymph node sampling from level 6 and all were benign on final pathology. The mean duration of post-operative follow-up was 15months. There was no morbidity associated with surgery in any of these patients with eight of the ten patients requiring thyroid hormone replacement. None of the patients needed further neck surgery for thyroid disease. de Quervain's thyroiditis is an inflammatory condition of the thyroid that is rarely treated surgically. However when presentation is atypical and the FNAC is inconclusive or is suspicious for a malignancy, patients receive surgery putting them at a risk for morbidity. Good clinical

  14. Theory, design, and operation of liquid metal fast breeder reactors, including operational health physics

    International Nuclear Information System (INIS)

    Adams, S.R.

    1985-10-01

    A comprehensive evaluation was conducted of the radiation protection practices and programs at prototype LMFBRs with long operational experience. Installations evaluated were the Fast Flux Test Facility (FFTF), Richland, Washington; Experimental Breeder Reactor II (EBR-II), Idaho Falls, Idaho; Prototype Fast Reactor (PFR) Dounreay, Scotland; Phenix, Marcoule, France; and Kompakte Natriumgekuhlte Kernreak Toranlange (KNK II), Karlsruhe, Federal Republic of Germany. The evaluation included external and internal exposure control, respiratory protection procedures, radiation surveillance practices, radioactive waste management, and engineering controls for confining radiation contamination. The theory, design, and operating experience at LMFBRs is described. Aspects of LMFBR health physics different from the LWR experience in the United States are identified. Suggestions are made for modifications to the NRC Standard Review Plan based on the differences

  15. Theory, design, and operation of liquid metal fast breeder reactors, including operational health physics

    Energy Technology Data Exchange (ETDEWEB)

    Adams, S.R.

    1985-10-01

    A comprehensive evaluation was conducted of the radiation protection practices and programs at prototype LMFBRs with long operational experience. Installations evaluated were the Fast Flux Test Facility (FFTF), Richland, Washington; Experimental Breeder Reactor II (EBR-II), Idaho Falls, Idaho; Prototype Fast Reactor (PFR) Dounreay, Scotland; Phenix, Marcoule, France; and Kompakte Natriumgekuhlte Kernreak Toranlange (KNK II), Karlsruhe, Federal Republic of Germany. The evaluation included external and internal exposure control, respiratory protection procedures, radiation surveillance practices, radioactive waste management, and engineering controls for confining radiation contamination. The theory, design, and operating experience at LMFBRs is described. Aspects of LMFBR health physics different from the LWR experience in the United States are identified. Suggestions are made for modifications to the NRC Standard Review Plan based on the differences.

  16. The Information Science Experiment System - The computer for science experiments in space

    Science.gov (United States)

    Foudriat, Edwin C.; Husson, Charles

    1989-01-01

    The concept of the Information Science Experiment System (ISES), potential experiments, and system requirements are reviewed. The ISES is conceived as a computer resource in space whose aim is to assist computer, earth, and space science experiments, to develop and demonstrate new information processing concepts, and to provide an experiment base for developing new information technology for use in space systems. The discussion covers system hardware and architecture, operating system software, the user interface, and the ground communication link.

  17. ATLAS Operations: Experience and Evolution in the Data Taking Era

    CERN Document Server

    Ueda, I; The ATLAS collaboration; Goossens, L; Stewart, G; Jezequel, S; Nairz, A; Negri, G; Campana, S; Di Girolamo, A

    2011-01-01

    This paper summarises the operational experience and improvements of the ATLAS hierarchical multi-tier computing infrastructure in the past year leading to taking and processing of the first collisions in 2009 and 2010. Special focus will be given to Tier-0 which is responsible, among other things, for a prompt processing of the raw data coming from the online DAQ system and is thus critical part of the chain. We will give an overview of the Tier-0 architecture, and improvements based on the operational experience. Emphasis will be put on the new developments, namely the Task Management System opening Tier-0 to expert users and Web 2.0 monitoring and management suite. We then overview the achieved performances with the distributed computing system, discuss observed data access patterns over the grid and describe how we used this information to improve analysis rates.

  18. Evolution of PHWR fuel transfer system based on operating experience

    International Nuclear Information System (INIS)

    Parvatikar, R.S.; Singh, Jaipal; Chaturvedi, P.C.; Bhambra, H.S.

    2006-01-01

    Fuel Transfer System facilitates loading of new fuel into Fuelling Machine, receipt of spent fuel from Fuelling Machine and its further transportation to Storage Bay. To overcome the limitations of transferring a pair of bundles in the single tube Airlock and Transfer Arm in RAPS-1 and 2/MAPS, a new concept of six tube Transfer Magazine was introduced in NAPS. This resulted in simultaneous loading of new fuel from Transfer Magazine into the Fuelling Machine and unloading of spent fuel from the Fuelling Machine through the exchange mode. It further facilitated the parallel/simultaneous operation of refuelling by Fuelling Machines on the reactor and transferring of spent fuel bundles from the Transfer Magazine to the bay. This new design of Fuel Transfer System was adopted for all standardised 220 MWe PHWRs. Based on the experience gained in 220 MWe PHWRs in the area of operation and maintenance, a number of improvements have been carried out over the years. These aspects have been further strengthened and refined in the Fuel Transfer System of 540 MWe units. The operating experience of the system indicates that the presence of heavy water in the Transfer Magazine poses limitations in its maintenance in the Fuel Transfer room. Further, Surveillance and maintenance of large number of under water equipment and associated valves, rams and underwater sensors is putting extra burden on the O and M efforts. A new concept of mobile light water filled Transfer Machine has been evolved for proposed 700 MWe PHWR units to simplify Fuel Transfer System. This has been made possible by adopting snout level control in the Fuelling Machine, elimination of Shuttle Transport System and locating the Storage Bay adjacent to the Reactor Building. This paper describes the evolution of Fuel Transfer System concepts and various improvements based on the experience gained in the operation and maintenance of the system. (author)

  19. Operator training for the abnormal

    International Nuclear Information System (INIS)

    Marzec, R.J.

    1977-01-01

    Training of nuclear power plant control room operators, on actions to be taken for an abnormal event, has classically been limited to discussion, on-shift and/or during requalification training classes, of symptoms, logical thought processes, systems analysis, and operator experience. The prerequisites for these discussions are a common technical vocabulary, and a minimum basic comprehension of nuclear power plant fundamentals, plant component theory of operation, system configuration, system control philosophy and operating procedures. Nuclear power plant control room operators are not the only personnel who are or should be involved in these discussions. The shift supervisors, operations management, and auxiliary equipment operators require continuing training in abnormal operations, as well. More in-depth training is necessary for shift supervisors and control room operators. The availability of vendor simulators has improved the effectiveness of training efforts for these individuals to some extent by displaying typical situations and plant performance characteristics and by providing a degree of ''hands on'' experience. The evolution of in-depth training with these simulators is reviewed

  20. A review of low density porous materials used in laser plasma experiments

    Science.gov (United States)

    Nagai, Keiji; Musgrave, Christopher S. A.; Nazarov, Wigen

    2018-03-01

    This review describes and categorizes the synthesis and properties of low density porous materials, which are commonly referred to as foams and are utilized for laser plasma experiments. By focusing a high-power laser on a small target composed of these materials, high energy and density states can be produced. In the past decade or so, various new target fabrication techniques have been developed by many laboratories that use high energy lasers and consequently, many publications and reviews followed these developments. However, the emphasis so far has been on targets that did not utilize low density porous materials. This review therefore, attempts to redress this balance and endeavors to review low density materials used in laser plasma experiments in recent years. The emphasis of this review will be on aspects of low density materials that are of relevance to high energy laser plasma experiments. Aspects of low density materials such as densities, elemental compositions, macroscopic structures, nanostructures, and characterization of these materials will be covered. Also, there will be a brief mention of how these aspects affect the results in laser plasma experiments and the constrictions that these requirements put on the fabrication of low density materials relevant to this field. This review is written from the chemists' point of view to aid physicists and the new comers to this field.