  1. Reviewing operational experience feedback

    International Nuclear Information System (INIS)

    1991-04-01

    The purpose of this document is to provide detailed supplementary guidance to OSART experts to aid in the evaluation of operational experience feedback (OEF) programmes at nuclear power plants. The document begins by describing the objectives of an OEF programme. It goes on to indicate preparatory work and investigatory guidance for the expert. Section 5 describes attributes of an excellent OEF programme. Appended to these guidelines are examples of OEF documents from various plants. These are intended to help the expert by demonstrating the actual implementation of OEF in practice. These guidelines are in no way intended to conflict with existing national regulations and rules. A comprehensive OEF programme, as described in Section 2, would be impossible to evaluated in detail in the amount of time typically allocated for assessing OEF in an OSART review. The expert must use his or her time wisely by concentrating on those areas that appear to be the weakest

  2. Stack Monitor Operating Experience Review

    International Nuclear Information System (INIS)

    Cadwallader, L.C.; Bruyere, S.A.

    2009-01-01

    Stack monitors are used to sense radioactive particulates and gases in effluent air being vented from rooms of nuclear facilities. These monitors record the levels and types of effluents to the environment. This paper presents the results of a stack monitor operating experience review of the U.S. Department of Energy (DOE) Occurrence Reporting and Processing System (ORPS) database records from the past 18 years. Regulations regarding these monitors are briefly described. Operating experiences reported by the U.S. DOE and in engineering literature sources were reviewed to determine the strengths and weaknesses of these monitors. Electrical faults, radiation instrumentation faults, and human errors are the three leading causes of failures. A representative 'all modes' failure rate is 1E-04/hr. Repair time estimates vary from an average repair time of 17.5 hours (with spare parts on hand) to 160 hours (without spare parts on hand). These data should support the use of stack monitors in any nuclear facility, including the National Ignition Facility and the international ITER project.

  3. Magnet operating experience review for fusion applications

    International Nuclear Information System (INIS)

    Cadwallader, L.C.

    1991-11-01

    This report presents a review of magnet operating experiences for normal-conducting and superconducting magnets from fusion, particle accelerator, medical technology, and magnetohydrodynamics research areas. Safety relevant magnet operating experiences are presented to provide feedback on field performance of existing designs and to point out the operational safety concerns. Quantitative estimates of magnet component failure rates and accident event frequencies are also presented, based on field experience and on performance of similar components in other industries

  4. Continuous Air Monitor Operating Experience Review

    International Nuclear Information System (INIS)

    Cadwallader, L.C.; Bruyere, S.A.

    2008-01-01

    Continuous air monitors (CAMs) are used to sense radioactive particulates in room air of nuclear facilities. CAMs alert personnel of potential inhalation exposures to radionuclides and can also actuate room ventilation isolation for public and environmental protection. This paper presents the results of a CAM operating experience review of the DOE Occurrence Reporting and Processing System (ORPS) database from the past 18 years. Regulations regarding these monitors are briefly reviewed. CAM location selection and operation are briefly discussed. Operating experiences reported by the U.S. Department of Energy and in other literature sources were reviewed to determine the strengths and weaknesses of these monitors. Power losses, human errors, and mechanical issues cause the majority of failures. The average 'all modes' failure rate is 2.65E-05/hr. Repair time estimates vary from an average repair time of 9 hours (with spare parts on hand) to 252 hours (without spare parts on hand). These data should support the use of CAMs in any nuclear facility, including the National Ignition Facility and the international ITER experiment

  5. Tritium Room Air Monitor Operating Experience Review

    Energy Technology Data Exchange (ETDEWEB)

    L. C. Cadwallader; B. J. Denny

    2008-09-01

    Monitoring the breathing air in tritium facility rooms for airborne tritium is a radiological safety requirement and a best practice for personnel safety. Besides audible alarms for room evacuation, these monitors often send signals for process shutdown, ventilation isolation, and cleanup system actuation to mitigate releases and prevent tritium spread to the environment. Therefore, these monitors are important not only to personnel safety but also to public safety and environmental protection. This paper presents an operating experience review of tritium monitor performance on demand during small (1 mCi to 1 Ci) operational releases, and intentional airborne inroom tritium release tests. The tritium tests provide monitor operation data to allow calculation of a statistical estimate for the reliability of monitors annunciating in actual tritium gas airborne release situations. The data show a failure to operate rate of 3.5E-06/monitor-hr with an upper bound of 4.7E-06, a failure to alarm on demand rate of 1.4E-02/demand with an upper bound of 4.4E-02, and a spurious alarm rate of 0.1 to 0.2/monitor-yr.

  6. Operating experience review for the AP1000 plant

    International Nuclear Information System (INIS)

    Chaney, T. E.; Lipner, M. H.

    2006-01-01

    Westinghouse is performing an update to the Operating Experience Review (OER) Report for the AP1000 project to account for operating experience since December 1996. Significant Operating Experience Reports, Significant Event Reports, Significant Event Notifications, Operations and Maintenance Reminders, Topical Reports, Event Analysis Reports and Licensee Event Reports were researched for pertinent input to the update. As a part of the OER, Westinghouse has also conducted operator interviews and observations during simulated plant operations and after operating events. The main purpose of the OER is to identify Human Factors Engineering (HFE) related safety issues from existing operating plant experience and to ensure that these issues are addressed in the new design. The issues and lessons learned regarding operating experience provide a basis for improving the plant design. (authors)

  7. Fire protection system operating experience review for fusion applications

    International Nuclear Information System (INIS)

    Cadwallader, L.C.

    1995-12-01

    This report presents a review of fire protection system operating experiences from particle accelerator, fusion experiment, and other applications. Safety relevant operating experiences and accident information are discussed. Quantitative order-of-magnitude estimates of fire protection system component failure rates and fire accident initiating event frequencies are presented for use in risk assessment, reliability, and availability studies. Safety concerns with these systems are discussed, including spurious operation. This information should be useful to fusion system designers and safety analysts, such as the team working on the Engineering Design Activities for the International Thermonuclear Experimental Reactor

  8. Fire protection system operating experience review for fusion applications

    Energy Technology Data Exchange (ETDEWEB)

    Cadwallader, L.C.

    1995-12-01

    This report presents a review of fire protection system operating experiences from particle accelerator, fusion experiment, and other applications. Safety relevant operating experiences and accident information are discussed. Quantitative order-of-magnitude estimates of fire protection system component failure rates and fire accident initiating event frequencies are presented for use in risk assessment, reliability, and availability studies. Safety concerns with these systems are discussed, including spurious operation. This information should be useful to fusion system designers and safety analysts, such as the team working on the Engineering Design Activities for the International Thermonuclear Experimental Reactor.

  9. Safety review of experiments at Albuquerque Operations Office

    International Nuclear Information System (INIS)

    Elliott, K.

    1984-01-01

    The Department of Energy (DOE) Albuquerque Operations Office is responsible for the safety overview of nuclear reactor and critical assembly facilities at Sandia National Laboratories, Los Alamos National Laboratory, and the Rocky Flats Plant. The important safety concerns with these facilities involve the complex experiments that are performed, and that is the area emphasized. A determination is made by the Albuquerque Office (AL) with assistance from DOE/OMA whether or not a proposed experiment is an unreviewed safety question. Meetings are held with the contractor to resolve and clarify questions that are generated during the review of the proposed experiment. The AL safety evaluation report is completed and any recommendations are discussed. Prior to the experiment a preoperational appraisal is performed to assure that personnel, procedures, and equipment are in readiness for operations. During the experiment, any abnormal condition is reviewed in detail to determine any safety concerns

  10. Cryogenic system operating experience review for fusion applications

    International Nuclear Information System (INIS)

    Cadwallader, L.C.

    1992-01-01

    This report presents a review of cryogenic system operating experiences, from particle accelerator, fusion experiment, space research, and other applications. Safety relevant operating experiences and accident information are discussed. Quantitative order-of-magnitude estimates of cryogenic component failure rates and accident initiating event frequencies are presented for use in risk assessment, reliability, and availability studies. Safety concerns with cryogenic systems are discussed, including ozone formation, effects of spills, and modeling spill behavior. This information should be useful to fusion system designers and safety analysts, such as the team working on the International Thermonuclear Experimental Reactor design

  11. Ventilation Systems Operating Experience Review for Fusion Applications

    International Nuclear Information System (INIS)

    Cadwallader, L.C.

    1999-01-01

    This report is a collection and review of system operation and failure experiences for air ventilation systems in nuclear facilities. These experiences are applicable for magnetic and inertial fusion facilities since air ventilation systems are support systems that can be considered generic to nuclear facilities. The report contains descriptions of ventilation system components, operating experiences with these systems, component failure rates, and component repair times. Since ventilation systems have a role in mitigating accident releases in nuclear facilities, these data are useful in safety analysis and risk assessment of public safety. An effort has also been given to identifying any safety issues with personnel operating or maintaining ventilation systems. Finally, the recommended failure data were compared to an independent data set to determine the accuracy of individual values. This comparison is useful for the International Energy Agency task on fusion component failure rate data collection

  12. Research on the NPP human factors engineering operating experience review

    International Nuclear Information System (INIS)

    Ren Xiangchen; Miao Hongxing; Ning Zhonghe

    2006-01-01

    This paper addresses the importance of the human factors engineering (HFE) for the design of nuclear power plant (NPP), especially for the design of human-machine interface in the NPP. It also summarizes the scope and content of the NPP HFE. The function, scope, content and process of the NPP human factors engineering operating experience review (OER) are mainly focused on, and significantly discussed. Finally, it briefly introduces the situation of the studies on the OER in China. (authors)

  13. Vacuum system operating experience review for fusion applications

    International Nuclear Information System (INIS)

    Cadwallader, L.C.

    1994-03-01

    This report presents a review of vacuum system operating experiences from particle accelerator, fusion experiment, space simulation chamber, and other applications. Safety relevant operating experiences and accident information are discussed. Quantitative order-of-magnitude estimates of vacuum system component failure rates and accident initiating event frequencies are presented for use in risk assessment, reliability, and availability studies. Safety concerns with vacuum systems are discussed, including personnel safety, foreign material intrusion, and factors relevant to vacuum systems being the primary confinement boundary for tritium and activated dusts. This information should be useful to fusion system designers and safety analysts, such as the team working on the Engineering Design Activities for the International Thermonuclear Experimental Reactor

  14. Configuration control during plant outages. A review of operating experience

    Energy Technology Data Exchange (ETDEWEB)

    Peinador Veira, Miguel; El Kanbi, Semir [European Commission Joint Research Centre, Petten (Netherlands). Inst. for Energy and Transport; Stephan, Jean-Luc [Institut de Radioprotection et de Surete Nucleaire (IRSN), Fontenay-aux-Roses (France); Martens, Johannes [Gesellschaft fuer Anlagen- und Reaktorsicherheit (GRS) gGmbH, Koeln (Germany)

    2015-03-15

    After the occurrence of several significant events in nuclear power plants during shut-down modes of operation in the eighties, and from the results of probabilistic safety assessments completed in the nineties, it was clear that risk from low power and shutdown operational modes could not be neglected and had to be addressed by appropriate safety programs. A comprehensive review of operating experience from the last ten years has been conducted by the Joint Research Centre with the objective of deriving lessons learned and recommendations useful for nuclear regulatory bodies and utilities alike. This paper is focused on one particular challenge that any nuclear plant faces whenever it plans its next outage period: how to manage the configuration of all systems under a complex environment involving numerous concurrent activities, and how to make sure that systems are returned to their valid configuration before the plant resumes power operation. This study highlights the importance of conveying accurate but synthesized information on the status of the plant to the operators in the main control room. Many of the lessons learned are related to the alarm display in the control room and to the use of check lists to control the status of systems. Members of the industry and safety authorities may now use these recommendations and lessons learned to feed their own operating experience feedback programs, and check their applicability for specific sites.

  15. Operating experience review in development of SMART MMIS

    International Nuclear Information System (INIS)

    Suh, S. M.; Jang, G. S.; Lee, J. G.; Park, G. O.; Ko, J. H.

    2004-01-01

    We have developed HFE(Human Factors Engineering) program plan for the purpose of implementing man-machine interface system in SMART plant systematically. Elements of the plan are compatible to those of NUREG-0711, Rev.1, and OER(Operating Experience Review) is one of them. The main purpose of conducting an OER as part of HFE review is to identify HFE-related safety issues. If identified, design alternatives are carefully reviewed and selected as the way of resolution for those issues. The performing model of OER is described in this paper, showing a series of works must be done to identify and resolve HFE-related issues within the scope of SMART HFE works. Then two key issues and design alternatives resolving them are presented for examples

  16. Operating Experience Review of Tritium-in-Water Monitors

    Energy Technology Data Exchange (ETDEWEB)

    S. A. Bruyere; L. C. Cadwallader

    2011-09-01

    Monitoring tritium facility and fusion experiment effluent streams is an environmental safety requirement. This paper presents data on the operating experience of a solid scintillant monitor for tritium in effluent water. Operating experiences were used to calculate an average monitor failure rate of 4E-05/hour for failure to function. Maintenance experiences were examined to find the active repair time for this type of monitor, which varied from 22 minutes for filter replacement to 11 days of downtime while waiting for spare parts to arrive on site. These data support planning for monitor use; the number of monitors needed, allocating technician time for maintenance, inventories of spare parts, and other issues.

  17. Review and updates of the risk assessment for advanced test reactor operations for operating events and experience

    International Nuclear Information System (INIS)

    Atkinson, S.A.

    1996-01-01

    Annual or biannual reviews of the operating history of the Advanced Test Reactor (ATR) at the Idaho National Engineering Laboratory (INEL) have been conducted for the purpose of reviewing and updating the ATR probabilistic safety assessment (PSA) for operating events and operating experience since the first compilation of plant- specific experience data for the ATR PSA which included data for operation from initial power operation in 1969 through 1988. This technical paper briefly discusses the means and some results of these periodic reviews of operating experience and their influence on the ATR PSA

  18. Review of BNFL's operational experience of wet type flasks

    International Nuclear Information System (INIS)

    McWilliam, D.S.

    2004-01-01

    BNFL International Transport's operational experience includes shipping 6000te of spent fuel from Japan to Sellafield, through its dedicated terminal at Barrow, and to Cogema La Hague. This fuel was shipped under the PNTL (Pacific Nuclear Transport Ltd) banner for which BNFL is responsible. PNTL owned and operated a fleet of 5 ships for Japanese business and a fleet of 80 wet and 58 dry flasks, for the transport of Light Water Reactor (LWR) spent fuel, from both Pressurised Water Reactors (PWR) and Boiling Water Reactors (BWR). ''Wet'' or ''dry'' flask is the common terminology used to distinguish between spent fuel flasks transporting fuel where the fuel is immersed in water, or spent fuel flasks that have been drained of water and dried. This paper concentrates on the wet type of flask utilised to transport fuel to Sellafield, that is the Excellox type (including similar type NTL derivatives). It aims to provide a summary of operational experience during handling at power stations, shipment, unloading at reprocessors and from scheduled maintenance

  19. Operating experience review - Ventilation systems at Department of Energy Facilities

    Energy Technology Data Exchange (ETDEWEB)

    1994-05-01

    The Office of Special Projects (DP-35), formerly Office of Self-Assessment (DP-9), analyzed occurrences caused by problems with equipment and material and recommended the following systems for an in-depth study: (1) Selective Alpha Air Monitor (SAAM), (2) Emergency Diesel Generator, (3) Ventilation System, (4) Fire Alarm System. Further, DP-35 conducted an in-depth review of the problems associated with SAAM and with diesel generators, and made several recommendations. This study focusses on ventilation system. The intent was to determine the causes for the events related to these system that were reported in the Occurrence Reporting and Processing System (ORPS), to identify components that failed, and to provide technical information from the commercial and nuclear industries on the design, operation, maintenance, and surveillance related to the system and its components. From these data, sites can develop a comprehensive program of maintenance management, including surveillance, to avoid similar occurrences, and to be in compliance with the following DOE orders.

  20. Bohunice V-1. Review of safety upgrading and operating experiences

    International Nuclear Information System (INIS)

    Korec, J.; Kuschel, D.

    2000-01-01

    The Bohunice site in the Slovak Republic has two Russian-designed twin-unit nuclear power plants, one equipped with reactors of the WWER 440/230 type, the other with type WWER 440/213 reactors. Two older units (V-1) started commercial operation in late 1978 and 1980 respectively and have been supplying electricity to the national grid since that time without any events that could have degraded plant safety level. In the period prior to 1990 the utility Slovenske Elektrarne (S.E.) performed extensive modifications and upgrades to the original design of the two older units V-1 NPP. Furthermore, significant steps in safety improvement for Bohunice NPP V-1 have been made since 1990. Following the political restructuring of the former Czechoslovakia and the country's new open-door policy towards western organizations, several international expert missions were focused on evaluation of Bohunice NPP safety status level and operational reliability, particularly targeting the two older units. Based on recommendations of individual expert missions and complementary deterministic and probabilistic safety analyses performed by S.E., the Czechoslovak Nuclear Regulatory Authority issued the Resolution No. 5/91 defining 81 measures concerning further safety and reliability improvement of Bohunice V1 .A range of short-term and long-term upgrades was prioritised in terms of importance to plant safety and work to implement these measures commenced in the early nineties. During the 'Small Reconstruction' from 1991 to 1993 some of the short term upgrading measures were realized to eliminate the most serious safety deficits, thus to achieve a significant reduction in core damage frequency and a major improvement in confinement integrity. In this paper and presentation the goals of the gradual reconstruction project, basic engineering, detailed engineering and realization, last major stage of Unit 2 upgrade, as well as final stage of Unit 1 upgrade in early 2000 are presented

  1. Operating experience

    International Nuclear Information System (INIS)

    McRae, L.P.; Six, D.E.

    1991-01-01

    In 1987, Westinghouse Hanford Company began operating a first-generation integrated safeguards system in the Plutonium Finishing Plant storage vaults. This Vault Safety and Inventory System is designed to integrate data into a computer-based nuclear material inventory monitoring system. The system gathers, in real time, measured physical parameters that generate nuclear material inventory status data for thousands of stored items and sends tailored report to the appropriate users. These data include canister temperature an bulge data reported to Plant Operations and Material Control and Accountability personnel, item presence and identification data reported to Material Control and Accountability personnel, and unauthorized item movement data reported to Security response forces and Material Control and Accountability personnel. The Westinghouse Hanford Company's experience and operational benefits in using this system for reduce radiation exposure, increase protection against insider threat, and real-time inventory control are discussed in this paper

  2. Operating experience review for nuclear power plants in the Systematic Evaluation Program

    International Nuclear Information System (INIS)

    Mays, G.T.; Harrington, K.H.

    1982-01-01

    The Systematic Evaluation Program Branch (SEPB) of the Nuclear Regulatory Commission (NRC) is conducting the Systematic Evaluation Program (SEP) whose purpose is to determine the safety margins of the design and operation of the eleven oldest operating commercial nuclear power plants in the United States. This paper describes the methodology and results of the operational experience review portion of the SEP evaluation. SEPB will combine the results from these operational reviews with other safety topic evaluations to perform an integrated assessment of the SEP plants

  3. Operational experience review and methods to enhance safety and reliability in the NPP-Leibstadt (KKL)

    Energy Technology Data Exchange (ETDEWEB)

    Haeusermann, R [Kernkraftwerk Leibstadt AG, Leibstadt (Switzerland)

    1997-10-01

    In the nuclear community it became clear that an integrated feedback system of operating experience must also include the unsuccessful results. The deviations, expected to achieved performance are analysed to the failure mode and its effect. KKL has lowered the number of safety significant events since commercial operation started. The thoroughness of the review/analysis of the events has increased with high priority set to human factor induced events in operation and maintenance. Since the participation of the author in the ASSET-Mission in Smolensk in 1993, KKL introduced the ASSET-Root-Cause method and has supplemented it by the HPES (Human Performance Enhancement System). 4 refs, 6 figs.

  4. Operational experience review and methods to enhance safety and reliability in the NPP-Leibstadt (KKL)

    International Nuclear Information System (INIS)

    Haeusermann, R.

    1997-01-01

    In the nuclear community it became clear that an integrated feedback system of operating experience must also include the unsuccessful results. The deviations, expected to achieved performance are analysed to the failure mode and its effect. KKL has lowered the number of safety significant events since commercial operation started. The thoroughness of the review/analysis of the events has increased with high priority set to human factor induced events in operation and maintenance. Since the participation of the author in the ASSET-Mission in Smolensk in 1993, KKL introduced the ASSET-Root-Cause method and has supplemented it by the HPES (Human Performance Enhancement System). 4 refs, 6 figs

  5. Operating experience review -- Conduct of operations at Department of Energy facilities

    International Nuclear Information System (INIS)

    1994-08-01

    This research examined human error related occurrences, reported in the ORPS database, for the purpose of identifying weaknesses in the implementation of the guidance regarding the Conduct of Operations contained in DOE 5480.19. Specifically, this research examined three separate samples of occurrence reports from Defense Program facilities, which cited human error as a direct or contributing cause. These reports were evaluated using a coding scheme which incorporated the guidelines present in 5480.19, as well as a number of generic human factors concerns. The second chapter of this report summarizes the coding scheme which was used to evaluate the occurrence reports. Since the coding scheme is quite lengthy, only the parts of the scheme needed to make the remainder of the report clear are included in this chapter. Details on the development and content of the coding scheme are reported in Appendices A, B, and C. Chapter 3 presents the analysis of three different data sets. This chapter demonstrates that similar results were obtained across different data sets, collected at different points in time, and coded by different raters. The implications of the results obtained in Chapter 3 are discussed in Chapter 4. This chapter makes a number of suggestions for reducing the problems found in the occurrence reports. Chapter 5 applies the methodology that has been developed in this report to two facilities at Los Alamos National Laboratory. Finally, Chapter 6 reiterates the major findings of this report. Several additional analyses appear in appendices at the end of this report

  6. Operating experience with snubbers

    International Nuclear Information System (INIS)

    Levin, H.; Cudlin, R.

    1978-06-01

    Recent operating experience with hydraulic and mechanical snubbers has indicated that there is a need to evaluate current practice in the industry associated with snubber qualification testing programs, design and analysis procedures, selection and specification criteria, and the preservice inspection and inservice surveillance programs. The report provides a summary of operational experiences that represent problems that are generic throughout the industry. Generic Task A-13 is part of the NRC Program for the Resolution of Generic Issues Related to Nuclear Power Plants described in NUREG-0410. The report is based upon a rather large amount of data that have become available in the past four years. These data have been evaluated by the Division of Operating Reactors to develop a data base for use in connection with several NRC activities including Category A, Technical Activity A-13 (Snubbers); the Standard Review Plan; future Regulatory Guides; ASME Code Provisions; and various technical specifications of operating nuclear power plants

  7. Review of operating experience at the Los Alamos Plutonium Electrorefining Facility, 1963-1977

    International Nuclear Information System (INIS)

    Mullins, L.J.; Morgan, A.N.

    1981-12-01

    This report reviews the operation of the Los Alamos Plutonium Electrorefining Plant at Technical Area 21 for the period 1964 through 1977. During that period, approximately 1568 kg of plutonium metal, > 99.95% pure, was produced in 653 runs from 1930 kg of metal fabrication scrap, 99% pure. General considerations of the electrorefining process and facility operation and recommendations for further improvement of the process are discussed

  8. PROSPER guidelines: Guidelines for peer review and for plant self-assessment of operational experience feedback process

    International Nuclear Information System (INIS)

    2003-01-01

    Effective use of operational performance information is an important element in any plant operator's arrangements for enhancing the operational safety of a nuclear power plant (NPP). This has been recognized in the IAEA Safety Fundamental, The Safety of Nuclear Installations (Safety Series No. 110). Under the technical aspects of safety, one of the principles of operation and maintenance is that the operating organization and the regulatory body shall establish complementary programmes to analyse operating experience to ensure that lessons are learned and acted upon. Such experience shall be shared with relevant national and international bodies. The Convention on Nuclear Safety, which entered into force in July 1996, also recognized the importance of operational experience feedback as a tool of high importance for the safety of nuclear plant operation and its further enhancement. It follows that the arrangements and results achieved under the operation experience feedback process in Member States will be covered by the national report under the Convention and will be subject to periodical review. These principles are further expanded in the IAEA Safety Standards Safety of Nuclear Power Plants: Operation (Safety Standard Series No. NS-R-2, year 2000) under the Feedback of The IAEA-led Peer Review of the effectiveness of the Operational Safety Performance Experience Review process (PROSPER) and associated guidelines have been developed to provide advice and assistance to utilities or individual power plants to strengthen and enhance the effectiveness of operational experience programmes in achieving these fundamental objectives. The objectives of the former IAEA Assessment of Significant Safety Events Team (ASSET) service have been expanded to include an evaluation of the effective use of all operating performance information available to the plant (e.g. external operating experience, internal low-level and near miss event reports and other relevant operating

  9. GNF2 Operating Experience

    International Nuclear Information System (INIS)

    Schardt, John

    2007-01-01

    GNF's latest generation fuel product, GNF2, is designed to deliver improved nuclear efficiency, higher bundle and cycle energy capability, and more operational flexibility. But along with high performance, our customers face a growing need for absolute fuel reliability. This is driven by a general sense in the industry that LWR fuel reliability has plateaued. Too many plants are operating with fuel leakers, and the impact on plant operations and operator focus is unacceptable. The industry has responded by implementing an INPO-coordinated program aimed at achieving leaker-free reliability by 2010. One focus area of the program is the relationship between fuel performance (i.e., duty) and reliability. The industry recognizes that the right balance between performance and problem-free fuel reliability is critical. In the development of GNF2, GNF understood the requirement for a balanced solution and utilized a product development and introduction strategy that specifically addressed reliability: evolutionary design features supported by an extensive experience base; thoroughly tested components; and defense-in-depth mitigation of all identified failure mechanisms. The final proof test that the balance has been achieved is the application of the design, initially through lead use assemblies (LUAs), in a variety of plants that reflect the diversity of the BWR fleet. Regular detailed surveillance of these bundles provides the verification that the proper balance between performance and reliability has been achieved. GNF currently has GNF2 lead use assemblies operating in five plants. Included are plants that have implemented extended power up-rates, plants on one and two-year operating cycles, and plants with and without NobleChem TM and zinc injection. The leading plant has undergone three pool-side inspections outages to date. This paper reviews the actions taken to insure GNF2's reliability, and the lead use assembly surveillance data accumulated to date to validate

  10. The Component Operational Experience Degradation and Ageing Program (CODAP). Review and lessons learned (2011-2014)

    International Nuclear Information System (INIS)

    Dragea, Tudor; Riznic, Jovica R.

    2015-01-01

    The structural integrity of piping systems is crucial to continuous and safe operation of nuclear power plants. Across all designs, the pressure boundary and its related piping and components, form one of the many levels of defense in the continuous and safe operation of a nuclear power plant. It is therefore necessary to identify, understand, evaluate and catalogue all of the various degradation mechanisms and failures that affect various piping systems and components across all nuclear power plants (NPP's). This need was first recognized in 1994 by the Swedish Nuclear Power Inspectorate (SKI) which launched a five-year Research and Development (R and D) project to explore the viability of creating an international pipe failure database (SKI-PIPE) (Riznic, 2007). The project was considered to be very successful and in 2002, the Organization for Economic Co-operation and Development (OECD) Pipe Failure Data Exchange (OPDE) was created. OPDE was operated under the umbrella of the OECD Nuclear Energy Agency (NEA) and was created in order to produce an international database on the piping service experience applicable to commercial nuclear power plants. After the successful completion of OPDE, the OECD, as well as other international members, agreed to participate in OPDE's successor: the Component Operational Experience Degradation and Ageing Program (CODAP). The objective of CODAP is to collect information on all possible events related to the failure and degradation of passive metallic components in NPP's. With CODAP winding down to the completion of its first phase in December 2014, this report will focus on the conclusions and the lessons learned throughout the many years of CODAP's implementation. There are currently 14 countries participating in CODAP, many of whom are industry leaders (France, Canada, U.S.A., Germany, Japan, Korea etc.). This cooperation on an international scale provides a library of OPerational EXperience (OPEX) for all participating NPP

  11. CANDU operating experience

    International Nuclear Information System (INIS)

    McConnell, L.G.; Woodhead, L.W.; Fanjoy, G.R.; Thurygill, E.W.

    1980-05-01

    The CANDU-PHW program is based upon 38 years of heavy water reactor experience with 35 years of operating experience. Canada has had 72 reactor years of nuclear-electric operations experience with 10 nuclear units in 4 generating stations during a period of 18 years. All objectives have been met with outstanding performance: worker safety, public safety, environmental emissions, reliable electricity production, and low electricity cost. The achievement has been realized through total teamwork involving all scientific disciplines and all project functions (research, design, manufacturing, construction, and operation). (auth)

  12. CANDU operating experience

    International Nuclear Information System (INIS)

    McConnell, L.G.; Woodhead, L.W.; Fanjoy, G.R.

    1982-03-01

    The CANDU Pressurized Heavy Water (CANDU-PHW) type of nuclear electric generating station has been developed jointly by Atomic Energy of Canada Limited and Ontario Hydro. This paper highlights Ontario Hydro's operating experience using the CANDU-PHW system, with a focus on the operating performance and costs, reliability of system components and nuclear safety considerations both to the workers and the public

  13. Operating experience feedback

    International Nuclear Information System (INIS)

    Cimesa, S.

    2007-01-01

    Slovenian Nuclear Safety Administration (SNSA) has developed its own system for tracking, screening and evaluating the operating experiences of the nuclear installations. The SNSA staff regularly tracks the operating experiences throughout the world and screens them on the bases of applicability for the Slovenian nuclear facilities. The operating experiences, which pass the screening, are thoroughly evaluated and also recent operational events in these facilities are taken into account. If needed, more information is gathered to evaluate the conditions of the Slovenian facilities and appropriate corrective actions are considered. The result might be the identification of the need for modification at the licensee, the need for modification of internal procedures in the SNSA or even the proposal for the modification of regulations. Information system helps everybody to track the process of evaluation and proper logging of activities. (author)

  14. Review of operational experience with the gas-cooled Magnox reactors of the United Kingdom Central Electricity Generating Board

    International Nuclear Information System (INIS)

    Cave, L.; Clarke, A.W.

    1984-01-01

    The paper provides a review, which is mainly of a statistical nature, of 260 reactor years of operating experience which the (United Kingdom) Central Electricity Generating Board (CEGB) has obtained with its gas-cooled, graphite moderated Magnox reactors. The main emphasis in the review is on safety rather than on availability. Data are provided on the overall incidence and frequencies of faults and it is shown that the plant items which are predominantly responsible for recorded faults are the gas circulators and the turbo-alternators. Analysis of the reactor trip experience shows that the incidence of events which necessitate an automatic shutdown of the reactor has been about one per reactor year and that of other events leading to a reactor trip has not been much higher (1.4 per reactor year). As would be expected from the length of the operating experience, some relatively rare events have occurred (expected frequency 10 -2 per reactor year, or less) but on each occasion the reactor shutdown system and decay heat removal systems functioned satisfactorily. No overheating of, or damage to, the fuel occurred as a result of these rare events or of other, more frequent, faults. Analysis of the trend of failure rates has shown an improvement with time in nearly all safety-related items and external inspection of the primary coolant circuits has shown no significant deterioration with time. However, some derating of the reactors has been necessary to reduce the effects of oxidation of mild steel in CO 2 , in order to obtain optimum service lives. In spite of major differences between the systems, a comparison of the failure rates of analogous systems and plant items in PWRs and the Magnox reactors show a considerable similarity. Overall, the review of CEGB's operational experience with its Magnos reactors has shown that the frequencies of faults in systems and plant items has been satisfyingly low. (author)

  15. Operating experience: safety perspective

    International Nuclear Information System (INIS)

    Piplani, Vivek; Krishnamurthy, P.R.; Kumar, Neeraj; Upadhyay, Devendra

    2015-01-01

    Operating Experience (OE) provides valuable information for improving NPP safety. This may include events, precursors, deviations, deficiencies, problems, new insights to safety, good practices, lessons and corrective actions. As per INSAG-10, an OE program caters as a fundamental means for enhancing the defence-in-depth at NPPs and hence should be viewed as ‘Continuous Safety Performance Improvement Tool’. The ‘Convention on Nuclear Safety’ also recognizes the OE as a tool of high importance for enhancing the NPP safety and its Article 19 mandates each contracting party to establish an effective OE program at operating NPPs. The lessons drawn from major accidents at Three Mile Island, Chernobyl and Fukushima Daiichi NPPs had prompted nuclear stalwarts to change their safety perspective towards NPPs and to frame sound policies on issues like safety culture, severe accident prevention and mitigation. An effective OE program, besides correcting current/potential problems, help in proactively improving the NPP design, operating and maintenance procedures, practices, training, etc., and thus plays vital role in ensuring safe and efficient operation of NPPs. Further it enhances knowledge with regard to equipment operating characteristics, system performance trends and provides data for quantitative and qualitative safety analysis. Besides all above, an OE program inculcates a learning culture in the organisation and thus helps in continuously enhancing the expertise, technical competency and knowledge base of its staff. Nuclear and Radiation Facilities in India are regulated by Atomic Energy Regulatory Board (AERB). Operating Plants Safety Division (OPSD) of AERB is involved in managing operating experience activities. This paper provides insights about the operating experience program of OPSD, AERB (including its on-line data base namely OPSD STAR) and its utilisation in improving the regulations and safety at Indian NPPs/projects. (author)

  16. ATLAS IBL operational experience

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00237659; The ATLAS collaboration

    2017-01-01

    The Insertable B-Layer (IBL) is the inner most pixel layer in the ATLAS experiment, which was installed at 3.3 cm radius from the beam axis in 2014 to improve the tracking performance. To cope with the high radiation and hit occupancy due to proximity to the interaction point, a new read-out chip and two different silicon sensor technologies (planar and 3D) have been developed for the IBL. After the long shut-down period over 2013 and 2014, the ATLAS experiment started data-taking in May 2015 for Run-2 of the Large Hadron Collider (LHC). The IBL has been operated successfully since the beginning of Run-2 and shows excellent performance with the low dead module fraction, high data-taking efficiency and improved tracking capability. The experience and challenges in the operation of the IBL is described as well as its performance.

  17. FFTF operational experience

    International Nuclear Information System (INIS)

    Newland, D.J.; Krupar, J.J.

    1984-01-01

    In April 1982, the FFTF began its first nominally 100 day irradiation cycle. Since that time the plant has operated very well with steadily increasing plant capacity factors during its first four cycles. One hundred fifty fuel assemblies (eighty of which are experiments) and over 32,000 individual fuel pins have been irradiated, some in excess of 100 MWd/Kg burnup. Specialized equipment and systems unique to sodium cooled reactor plants have performed well

  18. Experience with Periodic Safety Review (PSR) at Kozloduy NPP after 20 years of operation

    International Nuclear Information System (INIS)

    Popov, V.

    2011-01-01

    Conclusion: Measures in the long-term Programs for improving safety and radiation protection of unit 5&6, based on PSR outcome and addressed on the units’ operation licence renewal are under way. • NPP Kozloduy intends to fulfils requirements on modern nuclear power plants which occasionally exceeds limits of the effective national nuclear legislation

  19. Operating experience feedback program at Olkiluoto NPP

    International Nuclear Information System (INIS)

    Kosonen, Mikko

    2002-01-01

    Recent review and development of the operating experience feedback program will be described. The development of the program has been based on several reviews by outside organizations. Main conclusions from these review reports and from the self assessment of safety performance, safety problems and safety culture on the basis of the operational events made by ASSET-method will be described. An approach to gather and analyze small events - so-called near misses - will be described. The operating experience program has been divided into internal and external operating experience. ASSET-methodology and a computer program assisting the analysis are used for the internal operating experience events. Noteworthy incidents occurred during outage are analyzed also by ASSET-method. Screening and pre analysis of the external operating experience relies on co-operation with ERFATOM, an organization of Nordic utilities for the exchange of nuclear industry experience. A short presentation on the performance of the Olkiluoto units will conclude the presentation. (author)

  20. Operating experience in reprocessing

    International Nuclear Information System (INIS)

    Schueller, W.

    1983-01-01

    Since 1953, reprocessing has accumulated 180 years of operating experience in ten plants, six of them with 41 years of operation in reprocessing oxide fuel from light water reactors. After abortive, premature attempts at what is called commercial reprocessing, which had been oriented towards the market value of recoverable uranium and plutonium, non-military reprocessing technologies have proved their technical feasibility, since 1966 on a pilot scale and since 1976 on an industrial scale. Reprocessing experience obtained on uranium metal fuel with low and medium burnups can now certainly be extrapolated to oxide fuel with high burnup and from pilot plants to industrial scale plants using the same technologies. The perspectives of waste management of the nuclear power plants operated in the Federal Republic of Germany should be viewed realistically. The technical problems still to be solved are in a balanced relationship to the benefit arising to the national economy out of nuclear power generation and can be solved in time, provided there are clearcut political boundary conditions. (orig.) [de

  1. ERB-II operating experience

    International Nuclear Information System (INIS)

    Smith, R.N.; Cissel, D.W.; Smith, R.R.

    1977-01-01

    As originally designed and operated, EBR-II successfully demonstrated the concept of a sodium-cooled fast breeder power plant with a closed fuel reprocessing cycle (mini-nuclear park). Subsequent operation has been as an irradiation facility, a role which will continue into the foreseeable future. Since the beginning of operation in 1961, operating experience of EBR-II has been very satisfactory. Most of the components and systems have performed well. In particular, the mechanical performance of heat-removal systems has been excellent. A review of the operating experience reveals that all the original design objectives have been successfully demonstrated. To date, no failures or incidents resulting in serious in-core or out-of-core consequences have occurred. No water-to-sodium leaks have been detected over the life of the plant. At the present time, the facility is operating very well and continuously except for short shutdowns required by maintenance, refueling, modification, and minor repair. A plant factor of 76.9% was achieved for the calendar year 1976

  2. Report of the peer review mission of national operational safety experience feedback process to the Ukraine 11-15 November 1996 Kiev

    International Nuclear Information System (INIS)

    1996-01-01

    At the invitation of the Nuclear Regulatory Administration of Ukraine (NRA), the IAEA carried out a Peer review mission of national operational safety experience feedback process at Kiev from 11 to 15 November 1996. The objective of this mission was to provide the host country, represented by the regulatory body, with independent and comprehensive review of current status of operational safety experience feedback (OSEF) process with respect to the IAEA's recommendations and international practices. The mission concluded that principal arrangements of operational feedback process in Ukraine are, at present, in force and brought positive results since their introduction. The mission also noted several good practices in these activities. 1 tab

  3. Operating experience at CEBAF

    International Nuclear Information System (INIS)

    Legg, R.

    1996-01-01

    CEBAF, the Continuous Electron Beam Accelerator Facility, is a 5-pass, recirculating, superconducting rf linac designed to provide exceptional beam quality at 4 GeV up to 200 μA CW. It is made up of an injector, two 400-MeV linacs, and 9 recirculation arcs having a total beamline length of more than 4.5 km. On Nov. 5, 1995, CEBAF delivered a 4 GeV, 25-μA CW electron beam to the first of 3 experimental halls and the experimental physics program was started 10 days later. Accelerator availability during the first month of the experimental run exceeded 75%. Beam properties measured in the experimental hall to date are a one sigma momentum spread of 5x10 -5 and an rms emittance of 0.2 nanometer-radians, better than design specification. CW beam has been provided from all 5 passes at 800 MeV intervals. Outstanding performance of the superconducting linacs suggests a machine energy upgrade to 6 GeV in the near term with eventual machine operation at 8-10 GeV. Results from commissioning and operations experience since the last conference are presented

  4. Pipeline system operability review

    Energy Technology Data Exchange (ETDEWEB)

    Eriksson, Kjell [Det Norske Veritas (Norway); Davies, Ray [CC Technologies, Dublin, OH (United States)

    2005-07-01

    Pipeline operators are continuously working to improve the safety of their systems and operations. In the US both liquid and gas pipeline operators have worked with the regulators over many years to develop more systematic approaches to pipeline integrity management. To successfully manage pipeline integrity, vast amounts of data from different sources needs to be collected, overlaid and analyzed in order to assess the current condition and predict future degradation. The efforts undertaken by the operators has had a significant impact on pipeline safety, nevertheless, during recent years we have seen a number of major high profile accidents. One can therefore ask how effective the pipeline integrity management systems and processes are. This paper will present one methodology 'The Pipeline System Operability Review' that can evaluate and rate the effectiveness of both the management systems and procedures, as well as the technical condition of the hardware. The result from the review can be used to compare the performance of different pipelines within one operating company, as well as benchmark with international best practices. (author)

  5. Pipeline system operability review

    Energy Technology Data Exchange (ETDEWEB)

    Eriksson, Kjell [Det Norske Veritas (Norway); Davies, Ray [CC Technologies, Dublin, OH (United States)

    2005-07-01

    Pipeline operators are continuously working to improve the safety of their systems and operations. In the US both liquid and gas pipeline operators have worked with the regulators over many years to develop more systematic approaches to pipeline integrity management. To successfully manage pipeline integrity, vast amounts of data from different sources needs to be collected, overlaid and analyzed in order to assess the current condition and predict future degradation. The efforts undertaken by the operators has had a significant impact on pipeline safety, nevertheless, during recent years we have seen a number of major high profile accidents. One can therefore ask how effective the pipeline integrity management systems and processes are. This paper will present one methodology 'The Pipeline System Operability Review' that can evaluate and rate the effectiveness of both the management systems and procedures, as well as the technical condition of the hardware. The result from the review can be used to compare the performance of different pipelines within one operating company, as well as benchmark with international best practices. (author)

  6. Operational experience with the Daresbury accelerator tube

    International Nuclear Information System (INIS)

    Aitken, T.W.; Eastham, D.A.; Joy, T.; Leese, J.M.; Tait, N.R.S.; Thorn, R.

    1986-01-01

    Operational experience with the Daresbury MKI accelerator tube is reviewed with particular attention to conditioning and high voltage performance. The effects of surges and transients on the tube are described and lines of future development are discussed. (orig.)

  7. Recent U.S. reactor operating experience

    International Nuclear Information System (INIS)

    Stello, V. Jr.

    1977-01-01

    A qualitative assessment of U.S. and foreign reactor operating experience is provided. Recent operating occurrences having potentially significant safety impacts on power operation are described. An evaluation of the seriousness of each of these issues and the plans for resolution is discussed. A quantitative report on U.S. reactor operational experience is included. The details of the NRC program for evaluating and applying operating reactor experience in the regulatory process is discussed. A review is made of the adequacy of operating reactor safety and environmental margins based on actual operating experience. The Regulatory response philosophy to operating reactor experiences is detailed. This discussion indicates the NRC emphasis on the importance of a balanced action plan to provide for the protection of public safety in the national interest

  8. Tevatron operational experiences

    International Nuclear Information System (INIS)

    Norris, B.L.; Theilacker, J.C.

    1989-02-01

    Fermilabs superconducting accelerator, the Tevatron has been operational for nearly six years. The history of its operation is presented. Several long shutdowns for superconducting dipole repairs are discussed. The dominant factor influencing the repair was conductor motion which fatigued the cable in the magnet ends. Borescoping and x-raying techniques were used to determine which magnet ends required repair. Detailed downtime logs were kept for each of the running periods. A discussion of the sources of downtime and a comparison for different operating modes is presented

  9. Operating experience feedback in TVO

    Energy Technology Data Exchange (ETDEWEB)

    Piirto, A [Teollisuuden Voima Oy (Finland)

    1997-12-31

    TVO is a power company operating with two 710 MW BWR units at Olkiluoto. For operating experience feedback TVO has not established a separate organizational unit but rather relies on a group of persons representing various technical disciplines. The ``Operating Experience Group`` meets at about three-week intervals to handle the reports of events (in plant and external) which have been selected for handling by an engineer responsible for experience feedback. 7 charts.

  10. TRIGA reactor operating experience

    International Nuclear Information System (INIS)

    Anderson, T.V.

    1970-01-01

    The Oregon State TRIGA Reactor (OSTR) has been in operation 3 years. Last August it was upgraded from 250 kW to 1000 kW. This was accomplished with little difficulty. During the 3 years of operation no major problems have been experienced. Most of the problems have been minor in nature and easily corrected. They came from lazy susan (dry bearing), Westronics Recorder (dead spots in the range), The Reg Rod Magnet Lead-in Circuit (a new type lead-in wire that does not require the lead-in cord to coil during rod withdrawal hss been delivered, much better than the original) and other small corrections

  11. Operating Experience at NPP Krsko

    International Nuclear Information System (INIS)

    Kavsek, D.; Bach, B.

    1998-01-01

    Systematic analysis of operational experience by assessment of internal and industry events and the feedback of lessons learned is one of the essential activities in the improvement of the operational safety and reliability of the nuclear power plant. At NPP Krsko we have developed a document called ''Operating Experience Assessment Program''. Its purpose is to establish administrative guidance for the processing of operating events including on-site and industry events. Assessment of internal events is based on the following methods: Event and Causal Factor Charting, Change Analysis, Barrier Analysis, MORT (Management Oversight and Risk Tree Analysis) and Human Performance Evaluation. The operating experience group has developed a sophisticated program entitled ''Operating experience tracking system'' (OETS) in response to the need for a more efficient way of processing internal and industry operating experience information. The Operating Experience Tracking System is used to initiate and track operational events including recommended actions follow up. Six screens of the system contain diverse essential information which allows tracking of operational events and enables different kinds of browsing. OETS is a part of the NPP Krsko nuclear network system and can be easily accessed by all plant personnel. (author)

  12. NPD Operating Experience

    Energy Technology Data Exchange (ETDEWEB)

    Horton, E. P. [Hydro-Electric Power Commission of Ontario, Rolphton, ON (Canada)

    1968-04-15

    NPD has demonstrated high-capacity factor operation and for the past three years has achieved an average net capacity factor of 98% for the ''winter-peak'' period. The net capacity factor for the year 1966 was 88% and for the period from the end of commissioning (October 1962) to the end of 1966 was 71%. The output of the station has been stretched from 22 MW(e) gross to 25 MW(e) gross. This was aided by the installation of an internal steam separator in the turbine but no basic modifications to the reactor-boiler systems were required. The turbine has also been modified by the installation of chrome steel diaphragms as a solution to an erosion problem. The station also continues as a test facility to develop new components and techniques. This includes the recent successful replacement of two reactor pressure tubes and the conversion of the reactor vault ventilation system to a ''dry'' atmosphere using a molecular sieve to collect heavy-water leakage and control the concentration of acidic oxides of nitrogen. Fuel performance has been excellent and the average burn-up in the core is now 84 MWh/kg U which is slightly above the equilibrium design value. Only three fuel bundles have been found with sheath failures and none of these was due to a deficiency in the fuel but was as a result of handling problems with the refuelling equipment. In spite of undesirably high maintenance time, the fuelling machines have now inserted over 1000 fuel bundles into the reactor ''on power''. Heavy-water loss rates have been acceptable and are improving. The average loss rate from leaks during 1966 was 210 g/h. A proposal to modify the NPD heavy-water heat transport system to allow boiling is under consideration. (author)

  13. Review of fast reactor operating experience gained in 1998 in Russia. General trends of future fast reactor development

    International Nuclear Information System (INIS)

    Poplavski, V.M.; Ashurko, Y.M.; Zverev, K.V.; Sarayev, O.M.; Oshkanov, N.N.; Korol'kov, A.S.

    1999-01-01

    Review of the general state of nuclear power in Russia as for 1998 is given in brief in the paper. Results of operation of BR-10, BOR-60 and BN-600 fast reactors are presented as well as of scientific and technological escort of the BN-350 reactor. The paper outlines the current status and prospects of South-Urals and Beloyarskaya power unit projects with the BN-800 reactors. The main planned development trends on fast reactors are described concerning both new projects and R and D works. (author)

  14. MIT January Operational Internship Experience 2011

    Science.gov (United States)

    DeLatte, Danielle; Furhmann, Adam; Habib, Manal; Joujon-Roche, Cecily; Opara, Nnaemeka; Pasterski, Sabrina Gonzalez; Powell, Christina; Wimmer, Andrew

    2011-01-01

    This slide presentation reviews the 2011 January Operational Internship experience (JOIE) program which allows students to study operational aspects of spaceflight, how design affects operations and systems engineering in practice for 3 weeks. Topics include: (1) Systems Engineering (2) NASA Organization (3) Workforce Core Values (4) Human Factors (5) Safety (6) Lean Engineering (7) NASA Now (8) Press, Media, and Outreach and (9) Future of Spaceflight.

  15. Ontario Hydro CANDU operating experience

    International Nuclear Information System (INIS)

    Jackson, H.A.; Woodhead, L.W.; Fanjoy, G.R.

    1984-03-01

    The CANDU Pressurized Heavy Water (CANDU-PHW) type of nuclear-electric generating station has been developed jointly by Atomic Energy of Canada Limited and Ontario Hydro. This report highlights Ontario Hydro's operating experience using the CANDU-PHW system, with a focus on the operating performance and costs, reliability of system components and nuclear safety considerations for the workers and the public

  16. Ontario Hydro CANDU operating experience

    International Nuclear Information System (INIS)

    Bartholomew, R.W.; Woodhead, L.W.; Horton, E.P.; Nichols, M.J.; Daly, I.N.

    1987-01-01

    The CANDU Pressurized Heavy Water (CANDU-PHW) type of nuclear-electric generating station has been developed jointly by Atomic Energy of Canada Limited and Ontario Hydro. This report highlights Ontario Hydro's operating experience using the CANDU-PHW system, with a focus on worker and public safety, operating performance and costs, and reliability of system components

  17. Operating manual for the critical experiments facility

    International Nuclear Information System (INIS)

    1986-01-01

    The operation of the Critical Experiments Facility (CEF) requires careful attention to procedures in order that all safety precautions are observed. Since an accident could release large amounts of radioactivity, careful operation and strict enforcement of procedures are necessary. To provide for safe operation, detailed procedures have been written for all phases of the operation of this facility. The CEF operating procedures are not to be construed to constitute a part ofthe Technical Specifications. In the event of any discrepancy between the information given herein and the Technical Specifications, limits set forth in the Technical Specifications apply. All normal and most emergency operation conditions are covered by procedures presented in this manual. These procedures are designed to be followed by the operating personnel. Strict adherence to these procedures is expected for the following reasons. (1) To provide a standard, safe method of performing all operations, the procedures were written by reactor engineers experienced in supervising the operation of reactors and were reviewed by an organization with over 30 years of reactor operating experience. (2) To have an up-to-date description of operating techniques available at all times for reference and review, it is necessary that the procedures be written

  18. Operating manual for the critical experiments facility

    Energy Technology Data Exchange (ETDEWEB)

    1986-01-01

    The operation of the Critical Experiments Facility (CEF) requires careful attention to procedures in order that all safety precautions are observed. Since an accident could release large amounts of radioactivity, careful operation and strict enforcement of procedures are necessary. To provide for safe operation, detailed procedures have been written for all phases of the operation of this facility. The CEF operating procedures are not to be construed to constitute a part ofthe Technical Specifications. In the event of any discrepancy between the information given herein and the Technical Specifications, limits set forth in the Technical Specifications apply. All normal and most emergency operation conditions are covered by procedures presented in this manual. These procedures are designed to be followed by the operating personnel. Strict adherence to these procedures is expected for the following reasons. (1) To provide a standard, safe method of performing all operations, the procedures were written by reactor engineers experienced in supervising the operation of reactors and were reviewed by an organization with over 30 years of reactor operating experience. (2) To have an up-to-date description of operating techniques available at all times for reference and review, it is necessary that the procedures be written.

  19. Operating Experience Review(OER) and development of Issues Tracking System(ITS) for Jordan Research and Training Reactor(JRTR)

    International Nuclear Information System (INIS)

    Kim, Yong Jun; Lee, Hyun Chul

    2011-01-01

    The operation of the Jordan Research and Training Reactor which Korean consortium designs will start in March 2015. Though the power level of JRTR is different from the one of HANARO, a Korean research reactor, experience and expertise gained from the successful operation of the multipurpose research reactor, HANARO, would be applied for the design of JRTR because the basic operation principles of two reactors are almost same. From the point of human factors view, Operating Experience Review (OER) has the accurate purpose of reflecting accumulated knowledge to a new design and this activity are required to perform in the beginning stage of the control room designs in nuclear facilities. OER is to identify human factors engineering (HFE) issues related to safety. The issues from operating experience provide a basis for improving the plant design in a timely way. Identified issues are reported to an issues tracking system (ITS) so as to manage and resolve issues. HFE related safety issues are to be extracted from OER. The purpose of this paper is to present the scope and methods of OER for the JRTR design. In addition, a new ITS is proposed. The ITS is effective for issue management and has simplified states for issue development and small numbers of steps for issue control

  20. Operating practical experience at Argentina

    International Nuclear Information System (INIS)

    Quihillalt, Oscar

    1997-01-01

    Operating experiences of Atucha-1 and Embalse Nuclear Power Plants were discussed in this work. The technical and economic aspects, such as reliability, availability, personnel training, operating costs, prices and market, which exercise influence upon Argentina nuclear energy policy, mainly on the power electric generation by nuclear power plants were considered. Finally the current status of the nucleoelectric sector in Argentina and forecasting were analysed

  1. Operating experience and TPA: the Italian perspective

    International Nuclear Information System (INIS)

    Grimaldi, G.

    1990-01-01

    Collection and analysis of operating experience from the Italian plants and utilization of abroad data both to plants in operation and in construction are presented. Some results are also referred, aimed to evidence the role of the international cooperation to safe operation of nuclear plants. The approach to the Trend and Pattern analyses is described as well, and the use of computerized techniques of analysis on personal computer. Finally on going activities are introduced, specifically application of operating experience of plants in operation to small sized reactors and to ones with more intrinsic safety characteristics; review of the reporting system for future application and comparative analysis of the different realization of selected safety systems

  2. Industry Operating Experience Process at Krsko NPP

    International Nuclear Information System (INIS)

    Bach, B.; Bozin, B.; Cizmek, R.

    2012-01-01

    according to Corrective Action Program, which establishes guidance on the effective and efficient use of operating experience information to improve plant/personnel safety, plant reliability and commercial performance. The primary objectives of the Operating Experience Program are to promote the identification and transfer of lessons learned from internal and industry events to the plant personnel, and assure that such lessons are shared between Krsko NPP and the nuclear industry. The Operating Experience Program expects to prevent similar events from occurring at Krsko NPP by increasing plant personnel awareness of previous on-site and industry events and issues. Operating Experience Program should also identify and analyze weaknesses of the minor events and near misses in order to prevent occurrence of significant events. The purpose of this article is to present part of the Krsko NPP Operating Experience Program regarding to industry events. It will describe the methodology for receiving, processing, screening, reviewing, evaluating, status reporting, defining and implementing preventive/corrective actions in response to operating experience information of the events occurring off-site.(author).

  3. Fort Saint Vrain operational experience

    International Nuclear Information System (INIS)

    Fuller, C.H.

    1989-01-01

    Fort St. Vrain (FSV), on the system of the Public Service Company of Colorado, is the only high temperature gas-cooled (HTGR) power reactor in the United States. The plant features a helium-cooled reactor with a uranium-thorium fuel cycle. The paper describes the experience made during its operation. (author). 2 refs, 4 figs, 2 tabs

  4. Comparing PRAs with operating experience

    International Nuclear Information System (INIS)

    Picard, R.R.; Martz, H.F.

    1998-01-01

    Probabilistic Risk Assessment is widely used to estimate the frequencies of rare events, such as nuclear power plant accidents. An obvious question concerns the extent to which PRAs conform to operating experience--that is, do PRAs agree with reality? The authors discuss a formal methodology to address this issue and examine its performance using plant-specific data

  5. Emergency planning and operating experience

    International Nuclear Information System (INIS)

    Halpern, O.; Breniere, J.

    1984-01-01

    The purpose of this paper is to derive lessons from operating experience for the planning of emergency measures. This operating experience has two facets: it is obtained not only from the various incidents and accidents which have occurred in countries with nuclear power programmes and from the resulting application of emergency plans but also from the different exercises and simulations carried out in France and in other countries. Experience generally confirms the main approaches selected for emergency plans. The lessons to be derived are of three types: first, it appears necessary to set forth precisely the responsibilities of each person involved in order to prevent a watering-down of decisions in the event of an accident; secondly, considerable improvements need to be made in the different communication networks to be used; and thirdly, small accidents with minor radiological consequences deserve as systematic and thorough an approach as large and more improbable accidents. (author)

  6. Operating experience insights supporting ageing assessments

    International Nuclear Information System (INIS)

    Nitoi, M.

    2013-01-01

    Be effective in ageing management means looking at the right aspects, with the right techniques, and one of the most effective tool which could be used for that purpose is the analysis of operating experience. The paper has as objective to perform a review of available operating experience, with the aim to provide a better picture about the impact of ageing effects. The IAEA International Reporting System and NRC Licensee Event Reports were chosen as reference databases, both databases being internationally recognized as important sources of information about events occurrences in the nuclear power plants. The ageing related events identified in the selected time window were analyzed in detail, and the contributions of each major degradation mechanisms that have induced the ageing related events (specific to each defined group of components) was represented and discussed. The paper demonstrates the possibility to use operating experience insights in highlighting the ageing effects. (authors)

  7. EMSL 2008 Operational Review

    Energy Technology Data Exchange (ETDEWEB)

    Campbell, Allison A.

    2008-08-12

    The William R. Wiley Environmental Molecular Sciences Laboratory (EMSL) is a national user facility that contains state-of-the-art instrumentation and expert resources available for use by researchers from academia, industry, and the national laboratory system. The facility is supported by the U.S. Department of Energy’s (DOE) Biological and Environmental Research Program, but the research conducted within the facility benefits many funding agencies, including other branches of DOE, the National Institutes of Health, the National Science Foundation, and the Department of Defense. EMSL requires the continued funding and support of its stakeholders and clients to continue to grow its mission, build its reputation as a sought-after national user facility with cutting-edge capabilities, and attract high-profile users who will work to solve the most critical scientific challenges that affect DOE and the nation. In this vein, this document has been compiled to provide these stakeholders and clients with a review document that provides an abundance of information on EMSL’s history, current research activities, and proposed future direction.

  8. US remote monitoring operational experience

    International Nuclear Information System (INIS)

    Dupree, S.A.; Sonnier, C.S.

    1997-01-01

    Under international partnerships and bilateral agreements with the U.S. Department of Energy, Sandia National Laboratories, other national laboratories, and international partner organizations have emplaced remote monitoring systems in nuclear facilities and laboratories in various parts of the world for the purpose of conducting field trials of remote monitoring. The purpose of the present report is to review the results from these field trials and draw general conclusions regarding the trials. Many thousands of hours of sensor and system operation have been logged, and data have been retrieved from many locations. In virtually all cases the system components have functioned as intended and data have been successfully collected and transmitted for review. Comparisons between front-end-triggered video and time-lapse video have shown that the triggered record has captured all relevant monitored operations at the various nuclear facilities included in the field trials. We believe the utility and functional reliability of remote monitoring for international safeguards has been shown. However, it should be kept in mind that openness and transparency, including some form of short-notice inspections, are likely to be prerequisites to the safeguards implementation of remote monitoring in any State

  9. Operation experience at the UWTF

    International Nuclear Information System (INIS)

    Ueno, Kazuhiro; Inada, Kameji; Ohmori, Kouji; Usui, Kazuya; Irinouchi, Sigenori; Asami, Makoto; Tohchi, Katsunori

    2003-01-01

    This report describes the operation experience on the volume reduction of metal wastes and used air filters contaminated with uranium at the Uranium contaminated Waste Treatment Facility (UWTF) in JNC Tokai Works. The UWTF consists of the metal waste treatment system and the filter-waste treatment system. The former treats metal wastes, the latter treats used air filters. Metal wastes are unpacked from drums, cut, and then compacted. Used air filters are separated into filter media and frames. Then the filter media are compacted and the frames are crushed. The operation of the UWTF was started in June 1998. The following volumes of wastes had been treated at the UWTF from the beginning of the operation to March 2003 (for about 5 years). (1) 1,524 drums of the metal wastes had been reduced to 410 drums. The volume reduction factor was 3.7. (2) 372 drums of the used air filters had been reduced to 39 drums. The volume reduction factor was 9.5. These systems have been operated without trouble for 5 years and have demonstrated to be able to reduce the volumes of the wastes to designed values. The volume reduction technologies for metal wastes and used air filters contaminated with uranium were successfully demonstrated at the UWTF. (author)

  10. ATLAS Pixel Detector Operational Experience

    CERN Document Server

    Di Girolamo, B; The ATLAS collaboration

    2011-01-01

    The ATLAS Pixel Detector is the innermost detector of the ATLAS experiment at the Large Hadron Collider at CERN, providing high-resolution measurements of charged particle tracks in the high radiation environment close to the collision region. This capability is vital for the identification and measurement of proper decay times of long-lived particles such as b-hadrons, and thus vital for the ATLAS physics program. The detector provides hermetic coverage with three cylindrical layers and three layers of forward and backward pixel detectors. It consists of approximately 80 million pixels that are individually read out via chips bump-bonded to 1744 n-in-n silicon substrates. In this talk, results from the successful operation of the Pixel Detector at the LHC will be presented, including monitoring, calibration procedures, timing optimization and detector performance. The detector performance is excellent: 96.9% of the pixels are operational, noise occupancy and hit efficiency exceed the design specification, an...

  11. High Performance Computing Operations Review Report

    Energy Technology Data Exchange (ETDEWEB)

    Cupps, Kimberly C. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2013-12-19

    The High Performance Computing Operations Review (HPCOR) meeting—requested by the ASC and ASCR program headquarters at DOE—was held November 5 and 6, 2013, at the Marriott Hotel in San Francisco, CA. The purpose of the review was to discuss the processes and practices for HPC integration and its related software and facilities. Experiences and lessons learned from the most recent systems deployed were covered in order to benefit the deployment of new systems.

  12. Criteria for operator review of workplace changes

    International Nuclear Information System (INIS)

    Davey, E.

    2000-01-01

    A set of criteria for reviewing workplace changes has been developed for use by plant Operations staff. The criteria were developed to provide Operations staff with a practical framework for structuring assessments and subsequent review comments with regard to control room modifications and innovations that impact their work environment. The criteria were assembled from design, operations and human factors engineering principles, and system review experiences with plant Operations staff over the past ten years. Operations staff at several CANDU stations helped shape the emphasis for initial criteria definition and have assisted with criteria refinement through trial applications. Use of the criteria is expected to lead to more effective and task relevant equipment evaluations by Operations staff, and ultimately lead to system modifications and innovations that better serve plant operation needs. The paper begins with a discussion of the rationale for criteria development and the attributes of 'good' design. The balance of the paper outlines the project objectives, describes the approach applied in assembling, structuring, and refining the review criteria, and illustrates the application of the criteria in the review of a proposed control room innovation. (author)

  13. Operation experience with elevated ammonia

    International Nuclear Information System (INIS)

    Vankova, Katerina; Kysela, Jan; Malac, Miroslav; Petrecky, Igor; Svarc, Vladimir

    2011-01-01

    The 10 VVER units in the Czech and Slovak Republics are all in very good water chemistry and radiation condition, yet questions have arisen regarding the optimization of cycle chemistry and improved operation in these units. To address these issues, a comprehensive experimental program for different water chemistries of the primary circuit was carried out at the Rez Nuclear Research Institute, Czech Republic, with the goal of judging the influence of various water chemistries on radiation build-up. Four types of water chemistries were compared: standard VVER water chemistry (in common use), direct hydrogen dosing without ammonia, standard VVER water chemistry with elevated ammonia levels, and zinc dosing to standard VVER water chemistry. The test results showed that the types of water chemistry other than the common one have benefits for the operation of the nuclear power plant (NPP) primary circuit. Operation experience with elevated ammonia at NPP Dukovany Units 3 and 4 is presented which validates the experimental results, demonstrating improved corrosion product volume activity. (orig.)

  14. Principal working group No. 1 on operating experience and human factors (PWG1). Report of the task group on reviewing the activities

    International Nuclear Information System (INIS)

    2001-02-01

    A Task Group was formed by PWG-1 in the latter part of 1999 to review the mandate of PWG1 in light of new directions and assignments from CSNI, and to prepare a report that suggests future directions of the Working Group, in harmony with directions from CSNI. This report is the response of the Task Group. Principal Working Group no.1 was organized in September 1982. The group formed its charter, which included: - reviewing periodically activities for the collection, dissemination, storage and analysis of incidents reported under the IRS; - examining annually the incidents reported during the previous year in order to select issues (either technical or human-factor-oriented) with major safety significance and report them to CSNI; - encouraging feed-back through CSNI of lessons derived from operating experience to nuclear safety research programmes, including human factors studies; - providing a forum to exchange information in the field of human factors studies; - establishing short-term task forces, when necessary to carry out information exchange, special studies or any other work within its mandate; - making recommendations to CSNI for improving and encouraging these activities. The mandate of the working group was systematically re-examined in 1994. The purpose was to determine whether changes since the formation of the original mandate would indicate some need to refocus the directions of the working group. It was concluded that the main line of work (sometimes called the core business) of PWG1, which was shown to be an efficient tool for exchanging safety-significant operating experience and lessons learned from safety-significant issues, remained as valid and necessary in 1994 as it was in 1982. Some recommendations for improvement of efficiency were made, but the core business was unchanged. Very little of the mandate needed modification. With little change over nearly 20 years, these six items have constituted the mandate of PWG1. There have been twenty

  15. Operational and reliability experience with reactor instrumentation

    International Nuclear Information System (INIS)

    Dixon, F.; Gow, R.S.

    1978-01-01

    In the last 15 years the CEGB has experienced progressive plant development, integration and changes in operating regime through nine nuclear (gas-cooled reactor) power stations with corresponding instrumentation advances leading towards more refined centralized control. Operation and reliability experience with reactor instrumentation is reported in this paper with reference to the progressive changes related to the early magnox, late magnox and AGR periods. Data on instrumentation reliability in terms of reactor forced outages are presented and show that the instrumentation contributions to loss of generating plant availability are small. Reactor safety circuits, neutron flux and temperature measurements, gas analysis and vibration monitoring are discussed. In reviewing the reactor instrumentation the emphasis is on reporting recent experience, particularly on AGR equipment, but overall performance and changes to magnox equipment are included so that some appreciation can be obtained of instrumentation requirements with respect to plant lifetimes. (author)

  16. Regulatory challenges in using nuclear operating experience

    International Nuclear Information System (INIS)

    2006-01-01

    There can be no doubt that the systematic evaluation of operating experience by the operator and the regulator is essential for continued safe operation of nuclear power plants. Recent concerns have been voiced that the operating experience information and insights are not being used effectively to promote safety. If these concerns foreshadow a real trend in OECD countries toward complacency in reporting and analysing operating events and taking corrective actions, then past experience suggests that similar or even more serious events will recur. This report discusses how the regulator can take actions to assure that operators have effective programmes to collect and analyse operating experience and, just as important, for taking steps to follow up with actions to prevent the events and conditions from recurring. These regulatory actions include special inspections of an operator operating experience programme and discussion with senior plant managers to emphasize the importance of having an effective operating experience programme. In addition to overseeing the operator programmes, the regulator has the broader responsibility for assuring that industry-wide trends, both national and international are monitored. To meet these responsibilities, the regulatory body must have its own operating experience programme, and this report discusses the important attributes of such regulatory programmes. It is especially important for the regulator to have the capability for assessing the full scope of operating experience issues, including those that may not be included in an operator operating experience programme, such as new research results, international operating experience, and broad industry trend information. (author)

  17. Operating experience with high beta superconducting RF cavities

    International Nuclear Information System (INIS)

    Dylla, H.F.; Doolittle, L.R.; Benesch, J.F.

    1993-01-01

    The number of installed and operational β=1 superconducting rf cavities has grown significantly over the last two years in accelerator laboratories in Europe, Japan and the U.S. The total installed acceleration capability as of mid-1993 is approximately 1 GeV at nominal gradients. Major installations at CERN, DESY, KEK and CEBAF have provided large increments to the installed base and valuable operational experience. A selection of test data and operational experience gathered to date is reviewed

  18. Natural uranium metallic fuel elements: fabrication and operating experience

    International Nuclear Information System (INIS)

    Hammad, F.H.; Abou-Zahra, A.A.; Sharkawy, S.W.

    1980-01-01

    The main reactor types based on natural uranium metallic fuel element, particularly the early types, are reviewed in this report. The reactor types are: graphite moderated air cooled, graphite moderated gas cooled and heavy water moderated reactors. The design features, fabrication technology of these reactor fuel elements and the operating experience gained during reactor operation are described and discussed. The interrelation between operating experience, fuel design and fabrication was also discussed with emphasis on improving fuel performance. (author)

  19. Operating experience with high beta superconducting rf cavities

    International Nuclear Information System (INIS)

    Dylla, H.F.; Doolittle, L.R.; Benesch, J.F.

    1993-06-01

    The number of installed and operational β = 1 superconducting rf cavities has grown significantly over the last two years in accelerator laboratories in Europe, Japan and the US. The total installed acceleration capability as of mid-1993 is approximately 1 GeV at nominal gradients. Major installations at CERN, DESY, KEK and CEBAF have provided large increments to the installed base and valuable operational experience. A selection of test data and operational experience gathered to date is reviewed

  20. BWR and ABWR operating experience

    International Nuclear Information System (INIS)

    Nagai, Kimio; Takayama, Yoshito; Shimizu, Shunichi

    1998-01-01

    The first commercial operation of a nuclear power plant in Japan was in 1969. At present, there are 52 nuclear power plants operating in the country, accounting for about 35% of the total electricity generated and about 20 % of the total capacity of electricity generation facilities in Japan. Moreover, Japan has had the highest facility utilization rate, which is an indicator of operational safety, among the top four nuclear-generation countries (U.S.A., France, Germany, and Japan) every year since 1993, and has maintained a utilization rate of more than 80% since 1995. Toshiba has supported plant operation and maintenance in 19 nuclear power plants. The overall facility utilization rate of these plants attained a record of 86.4% in fiscal 1996. Furthermore, the averaged rates over the past three fiscal years from 1995 to 1997 have been the highest in the world among plant constructors such as GE, WH, and Siemens. (author)

  1. Operational experience feedback with precursor analysis

    International Nuclear Information System (INIS)

    Koncar, M.; Ferjancic, M.; Muehleisen, A.; Vojnovic, D.

    2003-01-01

    Experience of practical operation is a valuable source of information for improving the safety and reliability of nuclear power plants. Operational experience feedback (Olef) system manages this aspect of NPP operation. The traditional ways of investigating operational events, such as the root cause analysis (RCA), are predominantly qualitative. RCA as a part of the Olef system provides technical guidance and management expectations in the conduct of assessing the root cause to prevent recurrence, covering the following areas: conditions preceding the event, sequence of events, equipment performance and system response, human performance considerations, equipment failures, precursors to the event, plant response and follow-up, radiological considerations, regulatory process considerations and safety significance. The root cause of event is recognized when there is no known answer on question 'why has it happened?' regarding relevant condition that may have affected the event. At that point the Olef is proceeding by actions taken in response to events, utilization, dissemination and exchange of operating experience information and at the end reviewing the effectiveness of the Olef. Analysis of the event and the selection of recommended corrective/preventive actions for implementation and prioritization can be enhanced by taking into account the information and insights derived from Pasa-based analysis. A Pasa based method, called probabilistic precursor event analysis (PPE A) provides a complement to the RCA approach by focusing on how an event might have developed adversely, and implies the mapping of an operational event on a probabilistic risk model of the plant in order to obtain a quantitative assessment of the safety significance of the event PSA based event analysis provides, due to its quantitative nature, appropriate prioritization of corrective actions. PPEA defines requirements for PSA model and code, identifies input requirements and elaborates following

  2. Review of experiments

    International Nuclear Information System (INIS)

    Chang, C.; Yodh, G.; Cutts, D.; Lanou, R.; Engels, E.; Kramer, M.; Danby, G.

    1977-01-01

    A study was made to examine the effects which raising the ISA from 200 x 200 GeV to 400 x 400 GeV would have on the ''canonical'' experiments. These were ''canonical'' in the sense that they span the full range of foreseeable physics and have served as topics in previous Summer Studies and Workshops which resulted in quite explicit hardware designs and experimental goals. The study results indicate that all of the ''canonical'' experiments survive. Some are actually improved, some are unaffected, and some require changes which are suggested. In general, the 90 0 experiments are relatively unaffected. The single arm small angle spectrometer, the wide aperture (FATS-WASP) spectrometer and the Coulomb interference experiment have the largest number of modifications suggested. No uniqueness to these solutions are claimed, and there may be more desirable radical approaches. It is, however, felt that the 400 x 400 GeV ISA not only permits the work on conceptual experiments from previous Summer Studies to be taken over entirely, but indicates areas of improvement in many of them. Specifics of the individual experiments are discussed

  3. Nuclear units operating improvement by using operating experience

    International Nuclear Information System (INIS)

    Rotaru, I.; Bilegan, I.C.

    1997-01-01

    The paper presents how the information experience can be used to improve the operation of nuclear units. This areas include the following items: conservative decision making; supervisory oversight; teamwork; control room distraction; communications; expectations and standards; operator training and fundamental knowledge, procedure quality and adherence; plant status awareness. For each of these topics, the information illustrate which are the principles, the lessons learned from operating experience and the most appropriate exemplifying documents. (authors)

  4. Operational experience with superconducting synchrotron magnets

    International Nuclear Information System (INIS)

    Martin, P.S.

    1987-03-01

    The operational experience with the Fermilab Tevatron is presented, with emphasis on reliability and failure modes. Comprisons are made between the operating efficiencies for the superconducting machine and for he conventional Main Ring

  5. Operational experience with superconducting synchrotron magnets

    International Nuclear Information System (INIS)

    Martin, P.S.

    1987-01-01

    The operational experience with the Fermilab Tevatron is presented, with emphasis on reliability and failure modes. Comparisons are made between the operating efficiencies for the superconducting machine and for the conventional Main Ring

  6. Small sodium valve design and operating experience

    International Nuclear Information System (INIS)

    McGough, C.B.

    1974-01-01

    The United States Liquid Metal Fast Breeder Reactor program (LMFBR) includes an extensive program devoted to the development of small sodium valves. This program is now focused on the development and production of valves for the Fast Flux Test Facility (FFTF) now under construction near Richland, Washington. Other AEC support facilities, such as various test loops located at the Liquid Metal Engineering Center (LMEC), Los Angeles, California, and at the Hanford Engineering Development Laboratory (HEDL), Richland, Washington, also have significant requirements for small sodium valves, and valves similar in design to the FFTF valves are being supplied to these AEC laboratories for use in their critical test installations. A principal motivation for these valve programs, beyond the immediate need to provide high-reliability valves for FFTF and the support facilities, is the necessity to develop small valve technology for the Clinch River Breeder Reactor Plant (CRBRP). FFTF small sodium valve design and development experience will be directly applied to the CRBRP program. Various test programs have been, and are being, conducted to verify the performance and integrity of the FFTF valves, and to uncover any potential problems so that they can be corrected before the valves are placed in service in FFTF. The principal small sodium valve designs being utilized in current U.S. programs, the test and operational experience obtained to date on them, problems uncovered, and future development and testing efforts being planned are reviewed. The standards and requirements to which the valves are being designed and fabricated, the valve designs in current use, valve operators, test and operating experience, and future valve development plans are summarized. (U.S.)

  7. EBR-II operating experience

    International Nuclear Information System (INIS)

    Smith, C.R.F.

    1978-07-01

    Operation of the EBR-2 reactor is presented concerning the performance of the heat removal system; reactor materials; fuel handling system; sodium purification and sampling system; cover-gas purification; plant diagnostics and instrumentation; recent improvements in identifying fission product sources in EBR-2; and EBR-2 safety

  8. Reactor operator screening test experiences

    International Nuclear Information System (INIS)

    O'Brien, W.J.; Penkala, J.L.; Witzig, W.F.

    1976-01-01

    When it became apparent to Duquesne Light Company of Pittsburgh, Pennsylvania, that the throughput of their candidate selection-Phase I training-reactor operator certification sequence was something short of acceptable, the utility decided to ask consultants to make recommendations with respect to candidate selection procedures. The recommendation implemented was to create a Nuclear Training Test that would predict the success of a candidate in completing Phase I training and subsequently qualify for reactor operator certification. The mechanics involved in developing and calibrating the Nuclear Training Test are described. An arbitration decision that resulted when a number of International Brotherhood of Electrical Workers union employees filed a grievance alleging that the selection examination was unfair, invalid, not job related, inappropriate, and discriminatorily evaluated is also discussed. The arbitration decision favored the use of the Nuclear Training Test

  9. Experiences of an operating association

    International Nuclear Information System (INIS)

    Zefferer, H.

    1994-01-01

    The Austrian Draukraftwerke operate a coal power station with a capacity 110 MW el at St. Andraein Kaernten. In 1989, the first stage of a scheme for supplying the town St. Andraewith long-distance energy was started from this power station. To provide for the intermittent downtimes between the plant's operating times, which total an annual 2000 hours, a substitute aggregate was designed consisting of two biomass (chiefly bark)-fueled grate-firing boilers (4 MW th and 2.5 MW th ). The problems that arose during the first years in the areas of biomass storage, conveyor systems, slagging, emission values, and ash removal have meanwhile been solved satisfactorily. Moreover, the Draukraftwerke intend to use biomass for electricity generation in their coal power stations. (orig.) [de

  10. Review of experiments

    International Nuclear Information System (INIS)

    Lueth, V.

    1993-08-01

    While progress in particle physics may not be as swift as most scientists would like it to be, the data sample presently available has brought us a wealth of new information, all of which appears to cement the Standard Model. This report summarizes the most important results extracted from the many excellent review talks presented at this Symposium. Subject areas addressed here are: properties of neutral and charged leptons; search for rare decays; hadron structure and rare decays; standard model parameters; CP and CPT violation; heavy flavor physics; charm physics; beauty physics; B 0 -anti B 0 mixing; and unitarity triangle

  11. The Wonderland of Operating the ALICE Experiment

    CERN Document Server

    Augustinus, A; Pinazza, O; Rosinský, P; Lechman, M; Jirdén, L; Chochula, P

    2011-01-01

    ALICE is one of the experiments at the Large Hadron Collider (LHC), CERN, Geneva, Switzerland. Composed of 18 sub-detectors each with numerous subsystems that need to be controlled and operated in a safe and efficient way. The Detector Control System (DCS) is the key to this and has been used by detector experts with success during the commissioning of the individual detectors. During the transition from commissioning to operation, more and more tasks were transferred from detector experts to central operators. By the end of the 2010 datataking campaign, the ALICE experiment was run by a small crew of central operators, with only a single controls operator. The transition from expert to non-expert operation constituted a real challenge in terms of tools, documentation and training. A relatively high turnover and diversity in the operator crew that is specific to the HEP experiment environment (as opposed to the more stable operation crews for accelerators) made this challenge even bigger. Thi...

  12. Review of operating history at the Palisades Nuclear Plant

    International Nuclear Information System (INIS)

    Mays, G.T.; Harrington, K.H.

    1982-01-01

    the Systematic Evaluation Program Branch (SEPB) of the Nuclear Regulatory Commission (NRC) is conducting the Systematic Evaluation Program whose purpose is to determine the safety margins of the design and operation of the eleven oldest operating commercial nuclear power plants in the United States. A portion of the SEP includes the compilation and interpretation of operational occurrences at these plants. This summary describes the methodology and results of the operational experience review of Palisades Nuclear Plant. The review includes a detailed examination of the operating experience in two segments - plant shutdowns and power reductions, and reportable events

  13. Operational experience in underwater photogrammetry

    Science.gov (United States)

    Leatherdale, John D.; John Turner, D.

    Underwater photogrammetry has become established as a cost-effective technique for inspection and maintenance of platforms and pipelines for the offshore oil industry. A commercial service based in Scotland operates in the North Sea, USA, Brazil, West Africa and Australia. 70 mm cameras and flash units are built for the purpose and analytical plotters and computer graphics systems are used for photogrammetric measurement and analysis of damage, corrosion, weld failures and redesign of underwater structures. Users are seeking simple, low-cost systems for photogrammetric analysis which their engineers can use themselves.

  14. US nuclear safety review and experience

    International Nuclear Information System (INIS)

    Gilinsky, V.

    1977-01-01

    The nuclear safety review of commercial nuclear power reactors has changed over the years from the relatively simple review of Dresden 1 in 1955 to the highly complex and sophisticated regulatory process which characterizes today's reviews. Four factors have influenced this evolution: (1) maturing of the technology and industry; (2) development of the regulatory process and associated staff; (3) feedback of operating experience; and (4) public awareness and participation. The NRC's safety review responsibilities start before an application is tendered and end when the plant is decommissioned. The safety review for reactor licensing is a comprehensive, two-phase process designed to assure that all the established conservative acceptance criteria are satisfied. Operational safety is assured through a strong inspection and enforcement program which includes shutting down operating facilities when necessary to protect the health and safety of the public. The safety of operating reactors is further insured through close regulation of license changes and selective backfitting of new regulatory requirements. An effective NRC standards development program has been implemented and coordinates closely with the national standards program. A confirmatory safety research program has been developed. Both of these efforts are invaluable to the nuclear safety review because they provide the staff with key tools needed to carry out its regulatory responsibilities. Both have been given increased emphasis since the formation of the NRC in 1975. The safety review process will continue to evolve, but changes will be slower and more deliberate. It will be influenced by standardization, early site reviews and development of advanced reactor concepts. New legislation may make possible changes which will simplify and shorten the regulatory process. Certainly the experience provided by the increasing number and types of operating plants will have a very strong impact on future trends in the

  15. Operator training and the training simulator experience

    International Nuclear Information System (INIS)

    Mills, D.

    The author outlines the approach used by Ontario Hydro to train operators from the day they are hired as Operators-in-Training until they are Authorized Unit First Operators. He describes in detail the use of the simulator in the final year of the authorization program, drawing on experience with the Pickering NGS A simulator. Simulators, he concludes, are important aids to training but by no means all that is required to guarantee capable First Operators

  16. Self-assessment as an approach to improvement of efficient implementation of Ukrainian NPP operational experience

    International Nuclear Information System (INIS)

    Pecheritsya, L.M.; Lyigots'kij, O.Yi.; Pecheritsya, O.V.; Tarasenko, V.M.

    2012-01-01

    the paper contains a brief description of the procedure for implementation of operational experience, focuses on the role of self -assessment in efficient use of operational experience, presents a review of international and national practices of self-assessment and review of the main features, issues and ways to improve self-assessment of efficient use of operational experience in Ukraine

  17. Regulatory challenges in using nuclear operating experience

    International Nuclear Information System (INIS)

    2006-01-01

    The fundamental objective of all nuclear safety regulatory bodies is to ensure that nuclear utilities operate their plants in an acceptably safe manner at all times. Learning from experience has been a key element in meeting this objective. It is therefore very important for nuclear power plant operators to have an active programme for collecting, analysing and acting on the lessons of operating experience that could affect the safety of their plants. NEA experts have noted that almost all of the recent, significant events reported at international meetings have occurred earlier in one form or another. Counteractions are usually well-known, but information does not always seem to reach end users, or corrective action programmes are not always rigorously applied. Thus, one of the challenges that needs to be met in order to maintain good operational safety performance is to ensure that operating experience is promptly reported to established reporting systems, preferably international in order to benefit from a larger base of experience, and that the lessons from operating experience are actually used to promote safety. This report focuses on how regulatory bodies can ensure that operating experience is used effectively to promote the safety of nuclear power plants. While directed at nuclear power plants, the principles in this report may apply to other nuclear facilities as well. (author)

  18. Simulator experiments: effects of NPP operator experience on performance

    International Nuclear Information System (INIS)

    Beare, A.N.; Gray, L.H.

    1985-01-01

    Experiments are being conducted on nuclear power plant (NPP) control room training simulators by the Oak Ridge National Laboratory, its subcontractor, General Physics Corporation, and participating utilities. The experiments are sponsored by the Nuclear Regulatory Commission's (NRC) Human Factors and Safeguards Branch, Division of Risk Analysis and Operations, and are a continuation of prior research using simulators, supported by field data collection, to provide a technical basis for NRC human factors regulatory issues concerned with the operational safety of nuclear power plants. During the FY83 research, a simulator experiment was conducted at the control room simulator for a GE boiling water reactor (BWR) NPP. The research subjects were licensed operators undergoing requalification training and shift technical advisors (STAs). This experiment was designed to investigate the effects of (a) senior reactor operator (SRO) experience, (b) operating crew augmentation with an STA and (c) practice, as a crew, upon crew and individual operator performance, in response to anticipated plant transients. The FY84 experiments are a partial replication and extension of the FY83 experiment, but with PWR operators and simulator. Methodology and results to date are reported

  19. The District Health Information System (DHIS2): A literature review and meta-synthesis of its strengths and operational challenges based on the experiences of 11 countries.

    Science.gov (United States)

    Dehnavieh, Reza; Haghdoost, AliAkbar; Khosravi, Ardeshir; Hoseinabadi, Fahime; Rahimi, Hamed; Poursheikhali, Atousa; Khajehpour, Nahid; Khajeh, Zahra; Mirshekari, Nadia; Hasani, Marziyeh; Radmerikhi, Samera; Haghighi, Hajar; Mehrolhassani, Mohammad Hossain; Kazemi, Elaheh; Aghamohamadi, Saeide

    2018-01-01

    Health information systems offer many potential benefits for healthcare, including financial benefits and for improving the quality of patient care. The purpose of District Health Information Systems (DHIS) is to document data that are routinely collected in all public health facilities in a country using the system. The aim of this study was to examine the strengths and operational challenges of DHIS2, with a goal to enable decision makers in different counties to more accurately evaluate the outcomes of introducing DHIS2 into their particular country. A review of the literature combined with the method of meta-synthesis was used to source information and interpret results relating to the strengths and operational challenges of DHIS2. Databases (Embase, PubMed, Scopus and Google Scholar) were searched for documents related to strengths and operational challenges of DHIS2, with no time limit up to 8 April 2017. The review and evaluation of selected studies was conducted in three stages: title, abstract and full text. Each of the selected studies was reviewed carefully and key concepts extracted. These key concepts were divided into two categories of strengths and operational challenges of DHIS2. Then, each category was grouped based on conceptual similarity to achieve the main themes and sub-themes. Content analysis was used to analyse extracted data. Of 766 identified citations, 20 studies from 11 countries were included and analysed in this study. Identified strengths in the DHIS were represented in seven themes (with 21 categories): technical features of software, proper management of data, application flexibility, networking and increasing the satisfaction of stakeholders, development of data management, increasing access to information and economic benefits. Operational challenges were identified and captured in 11 themes (with 18 categories): funds; appropriate communication infrastructure; the need for the existence of appropriate data; political, cultural

  20. Review of WAG Field Experience

    DEFF Research Database (Denmark)

    Christensen, Jes Reimer; Stenby, Erling Halfdan; Skauge, A.

    2001-01-01

    well spacing is in the order of 1000 m. For the fields reviewed, a common trend for the successful injections is an increased oil recovery in the range of 5 to 10% of the oil initially in place (OIIP). Very few field trials have been reported as unsuccessful, but operational problems are often noted...

  1. Combining risk analysis and operating experience

    International Nuclear Information System (INIS)

    1986-10-01

    In recent years there has been an increasing interest in the systematic utilization of operating experience in the decision making process concerning large industrial facilities. Even before the advent of Probabilistic Safety Assessment (PSA), operating experience had always played an important role in such decisions. Of course, operating experience has always been an input to PSA also; however, as PSA becomes more mature and the quality and quantity of operating experience improve, greater emphasis is now being placed on the use of operating experience to update and validate PSA and thereby provide a more rational basis for decision making. This report outlines the ways in which data are collected, processed using mathematical techniques and utilized in decision making. It is not intended to provide details of the methods and procedures to be used in these areas, but is rather intended as an introduction to these topics and some of the relevant literature. The meeting presentations were divided into three sessions devoted to the following topics: evaluation of nuclear power plants operational experience (5 papers); uncertainties (2 papers); probabilistic safety assessment studies in Member States (7 papers). A separate abstract was prepared for each of these papers

  2. Commissioning and Operational Experience in Power Reactor Fuel Reprocessing Plant

    Energy Technology Data Exchange (ETDEWEB)

    Pradhan, S., E-mail: spradhan@barctara.gov.in [Tarapur Based Reprocessing Plant, Bhabha Atomic Research Centre, Tarapur (India)

    2014-10-15

    After completing design, construction, commissioning, operation and maintenance experience of the reprocessing plants at Tarapur, Mumbai and Kalpakkam a new reprocessing plant is commissioned and put into operation at BARC, Tarapur since 2011. Subsequent to construction clearance, commissioning of the plant is taken in many steps with simultaneous review by design and safety committees. In spite of vast experience, all the staff was retrained in various aspects of process and utility operations and in operation of innovative changes incorporated in the design. Operating personnel are licensed through an elaborate procedure consisting of various check lists followed by personnel interview. Commissioning systems were divided in sub-systems. Sub-systems were commissioned independently and later integrated testing was carried out. For commissioning, extreme operating conditions were identified in consultation with designers and detailed commissioning procedures were made accordingly. Commissioning was done in different conditions to ensure safety, smooth operation and maintainability. Few modifications were carried out based on commissioning experience. Technical specifications for operation of the plant are made in consultation with designers and reviewed by safety committees. Operation of the plant was carried out after successful commissioning trials with Deep Depleted Uranium (DDU). Emergency operating procedures for each design basis accident were made. Performance of various systems, subsystems are quite satisfactory and the plant has given very good capacity factor. (author)

  3. Operational experience of the Marcoule reactors

    International Nuclear Information System (INIS)

    Conte, F.

    1963-01-01

    The results obtaining from three years operation of the reactors G-2, G-3 have made it possible to accumulate a considerable amount of operational experience of these reactors. The main original points: - the pre-stressed concrete casing - the possibility of loading while under power - automatic temperature control have been perfectly justified by the results of operation. The author confirms the importance of these original solutions and draws conclusions concerning the study of future nuclear power stations. (author) [fr

  4. Simulator experiments: effects of NPP operator experience on performance

    International Nuclear Information System (INIS)

    Beare, A.N.; Gray, L.H.

    1984-01-01

    During the FY83 research, a simulator experiment was conducted at the control room simulator for a GE Boiling Water Reactor (BWR) NPP. The research subjects were licensed operators undergoing requalification training and shift technical advisors (STAs). This experiment was designed to investigate the effects of senior reactor operator (SRO) experience, operating crew augmentation with an STA and practice, as a crew, upon crew and individual operator performance, in response to anticipated plant transients. Sixteen two-man crews of licensed operators were employed in a 2 x 2 factorial design. The SROs leading the crews were split into high and low experience groups on the basis of their years of experience as an SRO. One half of the high- and low-SRO experience groups were assisted by an STA. The crews responded to four simulated plant casualties. A five-variable set of content-referenced performance measures was derived from task analyses of the procedurally correct responses to the four casualties. System parameters and control manipulations were recorded by the computer controlling the simulator. Data on communications and procedure use were obtained from analysis of videotapes of the exercises. Questionnaires were used to collect subject biographical information and data on subjective workload during each simulated casualty. For four of the five performance measures, no significant differences were found between groups led by high (25 to 114 months) and low (1 to 17 months as an SRO) experience SROs. However, crews led by low experience SROs tended to have significantly shorter task performance times than crews led by high experience SROs. The presence of the STA had no significant effect on overall team performance in responding to the four simulated casualties. The FY84 experiments are a partial replication and extension of the FY83 experiment, but with PWR operators and simulator

  5. Kayenta advanced series compensation operational experience

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-01

    The world's first three-phase, thyristor-controlled series compensation scheme with continuously variable impedance has been introduced into a transmission system. Energized and dedicated in September 1992, the installation was placed into commercial operation in January 1993 and has provided over one year of operating experience. This paper describes the 230 kV, 330 MVAr (60 Hz) advanced series compensation (ASC) project, located in north-eastern Arizona at Kayenta Substation on the 320 km Glen Canyon-Shiprock transmission line. The paper describes operating experiences, coordination with phase shifting transformer, phase shifter failure, platform power, system disturbances, and future plans.

  6. Feedback of operating experience in nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    The feedback of operating experience of nuclear facilities to the designers, manufacturers, operators and regulators is one important means of maintaining and improving safety. The Atomic Energy Control Board`s Advisory Committee on Nuclear Safety examined the means for feedback currently being employed, how effective they are and what improvements are advisable. The review found that the need for feedback of operating experience is well recognized within those institutions contributing to the safety of CANDU power reactors, and that the existing procedures are generally effective. Some recommendations, however, are submitted for improvement in the process.

  7. Feedback of operating experience in nuclear power plants

    International Nuclear Information System (INIS)

    1995-06-01

    The feedback of operating experience of nuclear facilities to the designers, manufacturers, operators and regulators is one important means of maintaining and improving safety. The Atomic Energy Control Board's Advisory Committee on Nuclear Safety examined the means for feedback currently being employed, how effective they are and what improvements are advisable. The review found that the need for feedback of operating experience is well recognized within those institutions contributing to the safety of CANDU power reactors, and that the existing procedures are generally effective. Some recommendations, however, are submitted for improvement in the process

  8. Experience in operation of heavy water reactors

    International Nuclear Information System (INIS)

    Rotaru, Ion; Bilegan, Iosif; Ghitescu, Petre

    1999-01-01

    The paper presents the main topics of the CANDU owners group (COG) meeting held in Mangalia, Romania on 7-10 September 1998. These meetings are part of the IAEA program for exchange of information related mainly to CANDU reactor operation safety. The first meeting for PHWR reactors took place in Vienna in 1989, followed by those in Argentina (1991), India (1994) and Korea (1996). The topics discussed at the meeting in Romania were: operation experience and recent major events, performances of CANDU reactors and safe operation, nuclear safety and operation procedures of PHWR, programs and strategies of lifetime management of installations and components of NPPs, developments and updates

  9. Spacelab operations planning. [ground handling, launch, flight and experiments

    Science.gov (United States)

    Lee, T. J.

    1976-01-01

    The paper reviews NASA planning in the fields of ground, launch and flight operations and experiment integration to effectively operate Spacelab. Payload mission planning is discussed taking consideration of orbital analysis and the mission of a multiuser payload which may be either single or multidiscipline. Payload analytical integration - as active process of analyses to ensure that the experiment payload is compatible to the mission objectives and profile ground and flight operations and that the resource demands upon Spacelab can be satisfied - is considered. Software integration is touched upon and the major integration levels in ground operational processing of Spacelab and its experimental payloads are examined. Flight operations, encompassing the operation of the Space Transportation System and the payload, are discussed as are the initial Spacelab missions. Charts and diagrams are presented illustrating the various planning areas.

  10. Nuclear Power Plant Operating Experience from the IAEA/NEA International Reporting System for Operating Experience 2012-2014

    International Nuclear Information System (INIS)

    2018-03-01

    The International Reporting System for Operating Experience (IRS) is an essential element of the international operating experience feedback system for nuclear power plants. Its fundamental objective is to contribute to improving safety of commercial nuclear power plants which are operated worldwide. IRS reports contain information on events of safety significance with important lessons learned which assist in reducing recurrence of events at other plants. This sixth publication, covering the period 2012 - 2014, follows the structure of the previous editions. It highlights important lessons based on a review of the approximately 240 event reports received from the participating countries over this period.

  11. The SM and MIR reactors operation experience

    International Nuclear Information System (INIS)

    Kuprienko, V.A.; Klinov, A.V.; Svyatkin, M.N.; Shamardin, V.K.

    1995-01-01

    The SM and MIR operation experience show that continuous work on the problem of ageing, in all its aspects, allows for prolongation of the research plant life cycle by several folds as compared to the initial project. The redesigned SM-3 reactor will operate for another 20 years. The similar result is expected from the MIR planned reconstruction which scope will be the topic of future presentations. (orig.)

  12. Nuclear power plant operating experience, 1976

    International Nuclear Information System (INIS)

    1977-11-01

    This report is the third in a series of reports issued annually that summarize the operating experience of U.S. nuclear power plants in commercial operation. Power generation statistics, plant outages, reportable occurrences, fuel element performance, occupational radiation exposure and radioactive effluents for each plant are presented. Summary highlights of these areas are discussed. The report includes 1976 data from 55 plants--23 boiling water reactor plants and 32 pressurized water reactor plants

  13. Operational experience with SLAC's beam containment electronics

    International Nuclear Information System (INIS)

    Constant, T.N.; Crook, K.; Heggie, D.

    1977-03-01

    Considerable operating experience was accumulated at SLAC with an extensive electronic system for the containment of high power accelerated beams. Average beam power at SLAC can approach 900 kilowatts with the potential for burning through beam stoppers, protection collimators, and other power absorbers within a few seconds. Fast, reliable, and redundant electronic monitoring circuits have been employed to provide some of the safeguards necessary for minimizing the risk to personnel. The electronic systems are described, and the design philosophy and operating experience are discussed

  14. LOFT instrumented fuel design and operating experience

    International Nuclear Information System (INIS)

    Russell, M.L.

    1979-01-01

    A summary description of the Loss-of-Fluid Test (LOFT) system instrumented core construction details and operating experience through reactor startup and loss-of-coolant experiment (LOCE) operations performed to date are discussed. The discussion includes details of the test instrumentation attachment to the fuel assembly, the structural response of the fuel modules to the forces generated by a double-ended break of a pressurized water reactor (PWR) coolant pipe at the inlet to the reactor vessel, the durability of the LOFT fuel and test instrumentation, and the plans for incorporation of improved fuel assembly test instrumentation features in the LOFT core

  15. Accelerator/Experiment operations - FY 2006

    Energy Technology Data Exchange (ETDEWEB)

    Brice, S.; Conrad, J.; Denisov, D.; Ginther, G.; Holmes, S.; James, C.; Lee, W.; Louis, W.; Moore, C.; Plunkett, R.; Raja, R.; /Fermilab

    2006-10-01

    This Technical Memorandum (TM) summarizes the Fermilab accelerator and experiment operations for FY 2006. It is one of a series of annual publications intended to gather information in one place. In this case, the information concerns the FY 2006 Run II at the Tevatron Collider, the MiniBooNE experiments running in the Booster Neutrino Beam in neutrino and antineutrino modes, MINOS using the Main Injector Neutrino Beam (NuMI), and SY 120 activities.

  16. Operational experiences feedback in Bohunice NPP

    Energy Technology Data Exchange (ETDEWEB)

    Betak, A [NPP Bohunice (Slovakia)

    1997-10-01

    The presentation reviews the following issues: OEF team in Bohunice NPP - structure; training and qualification: ASSET seminars on Prevention of incidents - INES manual handling, NRA-NRC the training on event investigation methods, NU - the training on HPES; legislation - documentation prepared in the frame of QA programme; results of OEF team activities; ASSET mission Dukovany - Experiences; the perspective activities.

  17. Accelerator/Experiment Operations - FY 2015

    Energy Technology Data Exchange (ETDEWEB)

    Czarapata, P. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); et al.

    2015-10-01

    This Technical Memorandum summarizes the Fermilab accelerator and experiment operations for FY 2015. It is one of a series of annual publications intended to gather information in one place. In this case, the information concerns the FY 2015 NOvA, MINOS+ and MINERvA experiments using the Main Injector Neutrino Beam (NuMI), the activities in the SciBooNE Hall using the Booster Neutrino Beam (BNB), and the SeaQuest experiment and Meson Test Beam (MTest) activities in the 120 GeV external Switchyard beam (SY120).

  18. Accelerator/Experiment Operations - FY 2016

    International Nuclear Information System (INIS)

    Blake, A.; Convery, M.; Geer, S.; Geesaman, D.; Harris, D.; Johnson, D.; Lang, K.; McFarland, K.; Messier, M.; Moore, C. D.; Newhart, D.; Reimer, P. E.; Plunkett, R.; Rominsky, M.; Sanchez, M.; Schmidt, J. J.; Shanahan, P.; Tate, C.; Thomas, J.; Donatella Torretta, Donatella Torretta; Matthew Wetstein, Matthew Wetstein

    2016-01-01

    This Technical Memorandum summarizes the Fermilab accelerator and experiment operations for FY 2016. It is one of a series of annual publications intended to gather information in one place. In this case, the information concerns the FY 2016 NOvA, MINOS+ and MINERvA experiments using the Main Injector Neutrino Beam (NuMI), the MicroBooNE experiment and the activities in the SciBooNE Hall using the Booster Neutrino Beam (BNB), and the SeaQuest experiment, LArIAT experiment and Meson Test Beam activities in the 120 GeV external switchyard beam (SY120). Each section was prepared by the relevant authors, and was then edited for inclusion in this summary.

  19. Accelerator/Experiment Operations - FY 2016

    Energy Technology Data Exchange (ETDEWEB)

    Blake, A. [Argonne National Lab. (ANL), Argonne, IL (United States); Convery, M. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Geer, S. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Geesaman, D. [Argonne National Lab. (ANL), Argonne, IL (United States); Harris, D. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Johnson, D. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Lang, K. [Argonne National Lab. (ANL), Argonne, IL (United States); McFarland, K. [Argonne National Lab. (ANL), Argonne, IL (United States); Messier, M. [Argonne National Lab. (ANL), Argonne, IL (United States); Moore, C. D. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Newhart, D. [Fermilab; Reimer, P. E. [Argonne; Plunkett, R. [Fermilab; Rominsky, M. [Fermilab; Sanchez, M. [Iowa State U.; Schmidt, J. J. [Fermilab; Shanahan, P. [Fermilab; Tate, C. [Fermilab; Thomas, J. [University Coll. London; Donatella Torretta, Donatella Torretta [Fermilab; Matthew Wetstein, Matthew Wetstein [Iowa State University

    2016-10-01

    This Technical Memorandum summarizes the Fermilab accelerator and experiment operations for FY 2016. It is one of a series of annual publications intended to gather information in one place. In this case, the information concerns the FY 2016 NOvA, MINOS+ and MINERvA experiments using the Main Injector Neutrino Beam (NuMI), the MicroBooNE experiment and the activities in the SciBooNE Hall using the Booster Neutrino Beam (BNB), and the SeaQuest experiment, LArIAT experiment and Meson Test Beam activities in the 120 GeV external switchyard beam (SY120). Each section was prepared by the relevant authors, and was then edited for inclusion in this summary.

  20. Operational experience with CMS Tier-2 sites

    International Nuclear Information System (INIS)

    Gonzalez Caballero, I

    2010-01-01

    In the CMS computing model, more than one third of the computing resources are located at Tier-2 sites, which are distributed across the countries in the collaboration. These sites are the primary platform for user analyses; they host datasets that are created at Tier-1 sites, and users from all CMS institutes submit analysis jobs that run on those data through grid interfaces. They are also the primary resource for the production of large simulation samples for general use in the experiment. As a result, Tier-2 sites have an interesting mix of organized experiment-controlled activities and chaotic user-controlled activities. CMS currently operates about 40 Tier-2 sites in 22 countries, making the sites a far-flung computational and social network. We describe our operational experience with the sites, touching on our achievements, the lessons learned, and the challenges for the future.

  1. Peer Review: Promoting Efficient School District Operations

    Science.gov (United States)

    Hale, Jason S.

    2010-01-01

    Many professions recognize the benefits of peer reviews to assess processes and operations because peers can more easily identify one another's inefficiencies and provide some kind of intervention. Generally, the goal of the peer review process is to verify whether the work satisfies the standards set by the industry. A number of states have begun…

  2. HANARO operation experience in the year 2004

    International Nuclear Information System (INIS)

    Oh, Soo-Youl; Kim, Heonil; Cho, Yeong-Garp; Jun, Byung-Jin

    2006-01-01

    The experiences of the HANARO operation and maintenance in the year 2004 are presented in this article. The operation of HANARO, a 30 MW research reactor operated by the Korea Atomic Energy Research Institute (KAERI), aims at a safe and effective operation to enhance its utilization in various fields of scientific research and industry. Regardless of its importance of the routine operation, this article is devoted to rather unusual matters such as irregular maintenance events and incidents. Since the first criticality in 1995, it has been a long-cherished task to reach the designed power level of 30 MW from the temporarily approved 24 MW. By resolving the concern on the fuel integrity, the designed level could be licensed and, eventually, it was achieved last November. On the other hand, after its 9 years of operation, the mechanical integrity of the heavy water reflector tank was checked. The measurement of the vertical straightness of the tank inner shell indicated its integrity. Meanwhile, the HANARO fuel production facility was completed at the KAERI site, and it will begin to supply centrifugally atomized fuels, instead of conventional comminuted fuels, to HANARO shortly. There were several incidents in 2004, which have all been cleared, including a leak of heavy water, melting of a sample in an irradiation hole for the neutron activation analysis, and a condensation problem in a horizontal beam tube. The progress of and lessons from each incident are presented. The utilization of HANARO is expanding every year and the trend will also continue in 2005. The operation mode has been changed from an 18-day continuous operation and 10-day shutdown (18-10 mode) to the 23-12 mode since the end of 2004, and a further extension is planned to the 30-12 mode. Thanks to this extended operation term, an increased power level and, most importantly, a reliable operation, the HANARO is gaining more and more credit from the end users. (author)

  3. Operational experience of the ATLAS accelerator

    Energy Technology Data Exchange (ETDEWEB)

    Den Hartog, P K; Bogaty, J M; Bollinger, L M; Clifft, B E; Craig, S L; Harden, R E; Markovich, P; Munson, F H; Nixon, J M; Pardo, R C; Phillips, D R; Shepard, K W; Tilbrook, I R; Zinkmann, G P [Argonne National Lab., IL (USA). Physics Div.

    1990-02-01

    The ATLAS accelerator consists of a HVEC model FN tandem accelerator injecting into a linac of independently-phased niobium superconducting resonators. The accelerator provides beams with masses 6 {le} A {le} 127 and with energies ranging up to 20 MeV/A for the lightest ions and 4 MeV/A for the heaviest ions. Portions of the linac have been in operation since 1978 and, over the last decade, more than 35000 h of operating experience have been accumulated. The long-term stability of niobium resonators, and their feasibility for use in heavy-ion accelerators is now well established. (orig.).

  4. Operational experience of extreme wind penetrations

    Energy Technology Data Exchange (ETDEWEB)

    Estanqueiro, Ana [INETI/LNEG - National Laboratory for Energy and Geology, Lisbon (Portugal); Mateus, Carlos B. [Instituto de Meteorologia, Lisboa (Portugal); Pestana, Rui [Redes Energeticas Nacionais (REN), Lisboa (Portugal)

    2010-07-01

    This paper reports the operational experience from the Portuguese Power System during the 2009/2010 winter months when record wind penerations were observed: the instantaneous wind power penetration peaked at 70% of consumption during no-load periods and the wind energy accounted for more than 50% of the energy consumed for a large period. The regulation measures taken by the TSO are presented in the paper, together with the additional reserves operated for added system security. Information on the overall power system behavior under such extreme long-term wind power penetrations will also be addressed. (org.)

  5. Operating procedures: Fusion Experiments Analysis Facility

    Energy Technology Data Exchange (ETDEWEB)

    Lerche, R.A.; Carey, R.W.

    1984-03-20

    The Fusion Experiments Analysis Facility (FEAF) is a computer facility based on a DEC VAX 11/780 computer. It became operational in late 1982. At that time two manuals were written to aid users and staff in their interactions with the facility. This manual is designed as a reference to assist the FEAF staff in carrying out their responsibilities. It is meant to supplement equipment and software manuals supplied by the vendors. Also this manual provides the FEAF staff with a set of consistent, written guidelines for the daily operation of the facility.

  6. Operating procedures: Fusion Experiments Analysis Facility

    International Nuclear Information System (INIS)

    Lerche, R.A.; Carey, R.W.

    1984-01-01

    The Fusion Experiments Analysis Facility (FEAF) is a computer facility based on a DEC VAX 11/780 computer. It became operational in late 1982. At that time two manuals were written to aid users and staff in their interactions with the facility. This manual is designed as a reference to assist the FEAF staff in carrying out their responsibilities. It is meant to supplement equipment and software manuals supplied by the vendors. Also this manual provides the FEAF staff with a set of consistent, written guidelines for the daily operation of the facility

  7. Preheat operating experiences at the FFTF

    International Nuclear Information System (INIS)

    Tucker, W.R.

    1978-01-01

    The rather extensive test program performed on the FFTF preheat control system resulted in successful sodium fill of one secondary heat transport loop on July 2, 1978. The data obtained during testing and the attendant operating experience gained resulted in some design changes and provided the information necessary to fully characterize system performance. Temperature excursions and deviations from preset limits of only a minor nature were encountered during preheat for sodium fill. The addition of the rate alarm feature was beneficial to operation of the preheat system and allowed early detection and correction of impending excursions

  8. Review of thorium fuel reprocessing experience

    International Nuclear Information System (INIS)

    Brooksbank, R.E.; McDuffee, W.T.; Rainey, R.H.

    1978-01-01

    The review reveals that experience in the reprocessing of irradiated thorium materials is limited. Plants that have processed thorium-based fuels were not optimized for the operations. Previous demonstrations of several viable flowsheets provide a sound technological base for the development of optimum reprocessing methods and facilities. In addition to the resource benefit by using thorium, recent nonproliferation thrusts have rejuvenated an interest in thorium reprocessing. Extensive radiation is generated as the result of 232 U-contamination produced in the 233 U, resulting in the remote operation and fabrication operations and increased fuel cycle costs. Development of the denatured thorium flowsheet, which is currently of interest because of nonproliferation concerns, represents a difficult technological challenge

  9. From USA operation experience of industrial uranium-graphite reactors

    International Nuclear Information System (INIS)

    Burdakov, N.S.

    1996-01-01

    The review on materials, presented by a group of the USA specialists at the seminar in Moscow on October 9-11, 1995 is considered. The above specialists shared their experience in operation of the Hanford industrial reactors, aimed at plutonium production for atomic bombs. The purpose of the above visit consisted in providing assistance to the Russian specialists by evaluation and modernization of operational conditions safety improvement of the RBMK type reactors. Special attention is paid to the behaviour of the graphite lining and channel tubes with an account of possible channel power interaction with the reactor structural units. The information on the experience of the Hanford reactor operation may be useful for specialists, operating the RBMK type reactors

  10. Operational Experience with the ATLAS Pixel Detector

    CERN Document Server

    Djama, Fares; The ATLAS collaboration

    2017-01-01

    Run 2 of the LHC collider sets new challenges to track and vertex reconstruction because of its higher energy, pileup and luminosity. The ATLAS tracking performance relies critically on the Pixel Detector. Therefore, in view of Run 2, the ATLAS collaboration has constructed the first 4-layer pixel detector in Particle Physics by installing a new pixel layer, called Insertable B-Layer (IBL). Operational experience and performance of the 4-layer Pixel Detector during Run 2 are presented.

  11. Operational Experience from Solar Thermal Energy Projects

    Science.gov (United States)

    Cameron, C. P.

    1984-01-01

    Over the past few years, Sandia National Laboratories were involved in the design, construction, and operation of a number of DOE-sponsored solar thermal energy systems. Among the systems currently in operation are several industrial process heat projects and the Modular Industrial Solar Retrofit qualification test systems, all of which use parabolic troughs, and the Shenandoah Total Energy Project, which uses parabolic dishes. Operational experience has provided insight to both desirable and undesirable features of the designs of these systems. Features of these systems which are also relevant to the design of parabolic concentrator thermal electric systems are discussed. Other design features discussed are system control functions which were found to be especially convenient or effective, such as local concentrator controls, rainwash controls, and system response to changing isolation. Drive systems are also discussed with particular emphasis of the need for reliability and the usefulness of a manual drive capability.

  12. Experience gained in enhancing operational safety at ComEd`s nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Elias, D [Commonwealth Edison Co. (United States)

    1997-09-01

    The following aspects of experience gained in enhancing operational safety at Comed`s nuclear power plants are discussed: nuclear safety policy; centralization/decentralization; typical nuclear operating organization; safety review boards; human performance enhancement; elements of effective nuclear oversight.

  13. Experience gained in enhancing operational safety at ComEd's nuclear power plants

    International Nuclear Information System (INIS)

    Elias, D.

    1997-01-01

    The following aspects of experience gained in enhancing operational safety at Comed's nuclear power plants are discussed: nuclear safety policy; centralization/decentralization; typical nuclear operating organization; safety review boards; human performance enhancement; elements of effective nuclear oversight

  14. Operating experience with the DRAGON High Temperature Reactor experiment

    International Nuclear Information System (INIS)

    Simon, R.A.; Capp, P.D.

    2002-01-01

    The Dragon Reactor Experiment in Winfrith/UK was a materials test facility for a number of HTR projects pursued in the sixties and seventies of the last century. It was built and managed as an OECD/NEA international joint undertaking. The reactor operated successfully between 1964 and 1975 to satisfy the growing demand for irradiation testing of fuels and fuel elements as well as for technological tests of components and materials. The paper describes the reactor's main experimental features and presents results of 11 years of reactor operation relevant for future HTRs. (author)

  15. EBR-II: summary of operating experience

    International Nuclear Information System (INIS)

    Perry, W.H.; Leman, J.D.; Lentz, G.L.; Longua, K.J.; Olson, W.H.; Shields, J.A.; Wolz, G.C.

    1978-01-01

    Experimental Breeder Reactor II (EBR-II) is an unmoderated, sodium-cooled reactor with a design power of 62.5 MWt. The primary cooling system is a submerged-pool type. The early operation of the reactor successfully demonstrated the feasibility of a sodium-cooled fast breeder reactor operating as an integrated reactor, power plant, and fuel-processing facility. In 1967, the role of EBR-II was reoriented from a demonstration plant to an irradiation facility. Many changes have been made and are continuing to be made to increase the usefulness of EBR-II for irradiation and safety tests. A review of EBR-II's operating history reveals a plant that has demonstrated high availability, stable and safe operating characteristics, and excellent performance of sodium components. Levels of radiation exposure to the operating and maintenance workers have been low; and fission-gas releases to the atmosphere have been minimal. Driver-fuel performance has been excellent. The repairability of radioactive sodium components has been successfully demonstrated a number of times. Recent highlights include installation and successful operation of (1) the hydrogen-meter leak detectors for the steam generators, (2) the cover-gas-cleanup system and (3) the cesium trap in the primary sodium. Irradiations now being conducted in EBR-II include the run-beyond-cladding breach fuel tests for mixed-oxide and carbide elements. Studies are in progress to determine EBR-II's capability for conducting important ''operational safety'' tests. These tests would extend the need and usefulness of EBR-II into the 1980's

  16. 14 CFR 121.434 - Operating experience, operating cycles, and consolidation of knowledge and skills.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Operating experience, operating cycles, and... Qualifications § 121.434 Operating experience, operating cycles, and consolidation of knowledge and skills. (a... position, the operating experience, operating cycles, and the line operating flight time for consolidation...

  17. Overview - Defense Waste Processing Facility Operating Experience

    International Nuclear Information System (INIS)

    Norton, M.R.

    2002-01-01

    The Savannah River Site's Defense Waste Processing Facility (DWPF) near Aiken, SC is the world's largest radioactive waste vitrification facility. Radioactive operations began in March 1996 and over 1,000 canisters have been produced. This paper presents an overview of the DWPF process and a summary of recent facility operations and process improvements. These process improvements include efforts to extend the life of the DWPF melter, projects to increase facility throughput, initiatives to reduce the quantity of wastewater generated, improved remote decontamination capabilities, and improvements to remote canyon equipment to extend equipment life span. This paper also includes a review of a melt rate improvement program conducted by Savannah River Technology Center personnel. This program involved identifying the factors that impacted melt rate, conducting small scale testing of proposed process changes and developing a cost effective implementation plan

  18. Operational experience in the United Kingdom

    International Nuclear Information System (INIS)

    Gronow, W.S.

    1977-01-01

    In the UK there are 26 Magnox reactors and 4 AGRs operating on 11 licensed sites; a further 6 AGRs are under construction on 2 additional and one of the existing sites. The arrangements by which the Nuclear Installations Inspectorate, on behalf of the Health and Safety Executive, carries out its regulatory functions at operating nuclear power plants are described. The range of activities undertaken is described with special reference being made to the biennial shutdowns for approved maintenance and inspections which are required by conditions attached to the site licence. The other means by which the continuing safety of these power reactors is assured are explained and include the relationship with the licensee's own Nuclear Safety Committee, approved arrangements for modifications to plant systems or components which have importance for safety and long term reviews of safety aspects. (author)

  19. Fast reactor operating experience gained in Russia: Analysis of anomalies and abnormal operation cases

    International Nuclear Information System (INIS)

    Ashurko, Y.M.; Baklushin, R.P.; Zagorulko, Y.I.; Ivanenko, V.N.; Matveyev, V.P.; Vasilyev, B.A.

    2000-01-01

    Review of various anomalous events and abnormal operation experience gained in the process of Russian fast reactors operation is given in the paper. The main information refers to the BN-600 demonstration reactor operation. Statistical data on sodium leaks and steam generator failures are presented, and sources of these events and countermeasures taken to avoid their appearance on the operating reactors as well as related changes made in the BN-800 reactor design are considered. In the paper, some features of impurities behaviour are considered in various modes of the BN-600 reactor operation. Information is given on the impurities ingress into the circuits, on abnormal situation emerged in the process of the BN-600 reactor operation and its probable cause. Information is presented on the event related to the increased torque of the BN-600 reactor central rotating column and repair works performed. (author)

  20. 1987 DOE review: First collider run operation

    International Nuclear Information System (INIS)

    Childress, S.; Crawford, J.; Dugan, G.

    1987-05-01

    This review covers the operations of the first run of the 1.8 TeV superconducting super collider. The papers enclosed cover: PBAR source status, fixed target operation, Tevatron cryogenic reliability and capacity upgrade, Tevatron Energy upgrade progress and plans, status of the D0 low beta insertion, 1.8 K and 4.7 K refrigeration for low-β quadrupoles, progress and plans for the LINAC and booster, near term and long term and long term performance improvements

  1. Experience from operating germanium detectors in GERDA

    Science.gov (United States)

    Palioselitis, Dimitrios; GERDA Collaboration

    2015-05-01

    Phase I of the Germanium Detector Array (GERDA) experiment, searching for the neutrinoless double beta (0νββ) decay of 76Ge, was completed in September 2013. The most competitive half-life lower limit for the 0νββ decay of 76Ge was set (T-0ν1/2 > 2.1 · 1025 yr at 90% C.L.). GERDA operates bare Ge diodes immersed in liquid argon. During Phase I, mainly refurbished semi-coaxial high purity Ge detectors from previous experiments were used. The experience gained with handling and operating bare Ge diodes in liquid argon, as well as the stability and performance of the detectors during GERDA Phase I are presented. Thirty additional new enriched BEGe-type detectors were produced and will be used in Phase II. A subgroup of these detectors has already been used successfully in GERDA Phase I. The present paper gives an overview of the production chain of the new germanium detectors, the steps taken to minimise the exposure to cosmic radiation during manufacturing, and the first results of characterisation measurements in vacuum cryostats.

  2. Experience from operating germanium detectors in GERDA

    International Nuclear Information System (INIS)

    Palioselitis, Dimitrios

    2015-01-01

    Phase I of the Germanium Detector Array (GERDA) experiment, searching for the neutrinoless double beta (0νββ) decay of 76 Ge, was completed in September 2013. The most competitive half-life lower limit for the 0νββ decay of 76 Ge was set (T- 0ν 1/2 > 2.1 · 10 25 yr at 90% C.L.). GERDA operates bare Ge diodes immersed in liquid argon. During Phase I, mainly refurbished semi-coaxial high purity Ge detectors from previous experiments were used. The experience gained with handling and operating bare Ge diodes in liquid argon, as well as the stability and performance of the detectors during GERDA Phase I are presented. Thirty additional new enriched BEGe-type detectors were produced and will be used in Phase II. A subgroup of these detectors has already been used successfully in GERDA Phase I. The present paper gives an overview of the production chain of the new germanium detectors, the steps taken to minimise the exposure to cosmic radiation during manufacturing, and the first results of characterisation measurements in vacuum cryostats. (paper)

  3. Operational experience of the ATLAS accelerator

    International Nuclear Information System (INIS)

    Den Hartog, P.K.; Bogaty, J.M.; Bollinger, L.M.

    1989-01-01

    The ATLAS accelerator consists of a HVEC model FN tandem accelerator injecting into a linac of independently-phased niobium superconducting resonators. The accelerator provides beams with masses from 6≤A≤127 and with energies ranging up to 20 MeV/A for the lightest ions and 4 MeV/A for the heaviest ions. Portions of the linac have been in operation since 1978 and, over the last decade, more than 35,000 hours of operating experience have been accumulated. The long-term stability of niobium resonators, and their feasibility for use in heavy-ion accelerators is now well established. 11 refs., 3 figs., 1 tab

  4. Operating experiences with 1 MW steam generator

    Energy Technology Data Exchange (ETDEWEB)

    Sano, A; Kanamori, A; Tsuchiya, T

    1975-07-01

    1 MW steam generator, which was planned as the first stage of steam generator development in Power Reactor and Nuclear Fuel Corp. (PNC) in Japan, is a single-unit, once-through, integrated shell and tube type with multi-helical coil tubes. It was completed in Oarai Engineering Center of PNC in March of 1971, and the various performance tests were carried out up to April, 1972. After the dismantle of the steam generator for structural inspection and material test, it was restored with some improvements. In this second 1 MW steam generator, small leak occurred twice during normal operation. After repairing the failure, the same kind of performance tests as the first steam generator were conducted in order to verify the thermal insulation effect of argon gas in downcomer zone from March to June, 1974. In this paper the above operating experiences were presented including the outline of some performance test results. (author)

  5. Selection of operations staff, qualifications and experience

    International Nuclear Information System (INIS)

    Gutmann, H.

    1977-01-01

    Requirements and suggestions have been made by authorities and various organisations in a number of countries which define necessary experience and training for the various groups of nuclear power plant personnel. For two countries, the USA and the FRG, a comparison has been made which shows that there is only a slight deviation, taking into account the different education systems. With the example of the Biblis nuclear power plant the training on the job is described. Especially the production or operation department is looked at in more detail. The training is split up into several parts: a general part, such as nuclear physics, reactor physics and engineering, reactor safety, radiation protection and so on and a plant related part, such as arrangement and mode of operation of the plant under normal and accident conditions, license conditions and so on. (orig.) [de

  6. Operational experience with the ATLAS Pixel Detector

    CERN Document Server

    Ince, T; The ATLAS collaboration

    2012-01-01

    The ATLAS Pixel Detector is the innermost element of the ATLAS experiment at the Large Hadron Collider at CERN, providing high-resolution measurements of charged particle tracks in the high radiation environment close to the collision region. This capability is vital for the identification and measurement of proper decay times of long-lived particles such as b-hadrons, and thus vital for the ATLAS physics program. The detector provides hermetic coverage with three cylindrical layers and three layers of forward and backward pixel detectors. It consists of approximately 80 million pixels that are individually read out via chips bump-bonded to 1744 n-in-n silicon substrates. In this paper, results from the successful operation of the Pixel Detector at the LHC will be presented, including monitoring, calibration procedures, timing optimization and detector performance. The detector performance is excellent: 96.2% of the pixels are operational, noise occupancy and hit efficiency exceed the design specification, an...

  7. Operational experience of the ATLAS Pixel detector

    CERN Document Server

    Hirschbuehl, D; The ATLAS collaboration

    2011-01-01

    The ATLAS Pixel Detector is the innermost detector of the ATLAS experiment at the Large Hadron Collider at CERN, providing high-resolution measurements of charged particle tracks in the high radiation environment close to the collision region. This capability is vital for the identification and measurement of proper decay times of long-lived particles such as b-hadrons, and thus vital for the ATLAS physics program. The detector provides hermetic coverage with three cylindrical layers and three layers of forward and backward pixel detectors. It consists of approximately 80 million pixels that are individually read out via chips bump-bonded to 1744 n-in-n silicon substrates. In this talk, results from the successful operation of the Pixel Detector at the LHC will be presented, including monitoring, calibration procedures, timing optimization and detector performance. The detector performance is excellent: 97,5% of the pixels are operational, noise occupancy and hit efficiency exceed the design specification, an...

  8. Operational experience of the ATLAS Pixel Detector

    CERN Document Server

    Marcisovsky, M; The ATLAS collaboration

    2011-01-01

    The ATLAS Pixel Detector is the innermost detector of the ATLAS experiment at the Large Hadron Collider at CERN, providing high-resolution measurements of charged particle tracks in the high radiation environment close to the collision region. This capability is vital for the identification and measurement of proper decay times of long-lived particles such as b-hadrons, and thus vital for the ATLAS physics program. The detector provides hermetic coverage with three cylindrical layers and three layers of forward and backward pixel detectors. It consists of approximately 80 million pixels that are individually read out via chips bump-bonded to 1744 n-in-n silicon substrates. In this talk, results from the successful operation of the Pixel Detector at the LHC will be presented, including monitoring, calibration procedures, timing optimization and detector performance. The detector performance is excellent: 97,5% of the pixels are operational, noise occupancy and hit efficiency exceed the design specification, an...

  9. The LHC test string first operational experience

    CERN Document Server

    Bézaguet, Alain-Arthur; Casas-Cubillos, J; Coull, L; Cruikshank, P; Dahlerup-Petersen, K; Faugeras, Paul E; Flemsæter, B; Guinaudeau, H; Hagedorn, Dietrich; Hilbert, B; Krainz, G; Kos, N; Lavielle, D; Lebrun, P; Leo, G; Mathewson, A G; Missiaen, D; Momal, F; Parma, Vittorio; Quesnel, Jean Pierre; Richter, D; Riddone, G; Rijllart, A; Rodríguez-Mateos, F; Rohmig, P; Saban, R I; Schmidt, R; Serio, L; Skiadelli, M; Suraci, A; Tavian, L; Walckiers, L; Wallén, E; Van Weelderen, R; Williams, L; McInturff, A

    1996-01-01

    CERN operates the first version of the LHC Test String which consists of one quadrupole and three 10-m twin aperture dipole magnets. An experimental programme aiming at the validation of the LHC systems started in February 1995. During this programme the string has been powered 100 times 35 of which at 12.4 kA or above. The experiments have yielded a number of results some of which, like quench recovery for cryogenics, have modified the design of subsystems of LHC. Others, like controlled helium leaks in the cold bore and quench propagation bewteen magnets, have given a better understanding on the evolution of the phenomena inside a string of superconducting magnets cooled at superfluid helium temperatures. Following the experimental programme, the string will be powered up and powered down in one hour cycles as a fatigue test of the structure thus simulating 20 years of operation of LHC.

  10. Operating experience with BWR nuclear power

    International Nuclear Information System (INIS)

    Bonsdorf, Magnus von.

    1986-01-01

    The two-unit nuclear power station in Olkiluoto on the western coast of Finland produces about 20 per cent of the electricity consumption of the country. The first unit, TVO-I was first connected to the national grid in September 1978 and TVO-II in February 1980. The original rated power output of each unit was 660 MWe, corresponding to the thermal power of 2000 MW from the reactor. Technical modifications allowed the power to be uprated by 8%. The operating statistics (load factors etc.) are given and the outage experience discussed. The radiological history shows very low radioactivity and dose levels have been maintained at the plant. (UK)

  11. Operational Experience with the ATLAS Pixel Detector

    CERN Document Server

    Lantzsch, Kerstin; The ATLAS collaboration

    2016-01-01

    Run 2 of the LHC is providing new challenges to track and vertex reconstruction with higher energies, denser jets and higher rates. Therefore the ATLAS experiment has constructed the first 4-layer Pixel detector in HEP, installing a new Pixel layer, also called Insertable B-Layer (IBL). In addition the Pixel detector was refurbished with new service quarter panels to recover about 3% of defective modules lost during run 1 and a new optical readout system to readout the data at higher speed while reducing the occupancy when running with increased luminosity. The commissioning, operation and performance of the 4-layer Pixel Detector will be presented.

  12. Operating experience with gamma ray irradiators

    International Nuclear Information System (INIS)

    Fraser, F.M.; Ouwerkerk, T.

    1980-01-01

    The experience of Atomic Energy of Canada, Limited (AECL) with radioisotopes dates back to the mid-1940s when radium was marketed for medical purposes. Cobalt-60 came on the scene in 1949 and within a few years a thriving business in cancer teletherapy machines and research irradiators was developed. AECL's first full-scale cobalt-60 gamma ray sterilizer for medical products was installed in 1964. AECL now has over 50 plants and 30 million curies in service around the world. Sixteen years of design experience in cobalt-60 sources, radiation shielding, safety interlock systems, and source pass mechanisms have made gamma irradiators safe, reliable, and easy to operate. This proven technology is being applied in promising new fields such as sludge treatment and food preservation. Cesium-137 is expected to be extensively utilized as the gamma radiation source for these applications

  13. Operational Experience with the ATLAS Pixel Detector

    CERN Document Server

    Djama, Fares; The ATLAS collaboration

    2017-01-01

    Run-2 of the LHC is providing new challenges to track and vertex reconstruction imposed by the higher collision energy, pileup and luminosity that are being delivered. The ATLAS tracking performance relies critically on the Pixel Detector, therefore, in view of Run-2 of LHC, the ATLAS experiment has constructed the first 4-layer Pixel detector in HEP, installing a new Pixel layer, also called Insertable B-Layer (IBL). Pixel detector was refurbished with a new service quarter panel to recover about 3% of defective modules lost during run-1 and an additional optical link per module was added to overcome in some layers the readout bandwidth limitation when LHC will exceed the nominal peak luminosity by almost a factor of 3. The key features and challenges met during the IBL project will be presented, as well as its operational experience and Pixel Detector performance in LHC.

  14. Operating experience and systems analysis at Trillo NPP: A program intended for systematic review of plant safety systems to assess design basis requirements compliance

    International Nuclear Information System (INIS)

    Vega, R. de la

    1996-01-01

    The program was defined to apply to all plant safety systems and/or systems included in plant Technical Specifications. The goal of the program was to ensure, by systematic design, construction, and commissioning review, the adequacy of safety systems, structures and components to fulfill their safety functions. Also, as a result of the program, it was established that a complete, unambiguous, systematic, design basis definition shall take place. And finally, a complete documental review of the plant design shall result from the program execution

  15. Review of operating room ventilation standards

    NARCIS (Netherlands)

    Melhado, M.D.A.; Hensen, J.L.M.; Loomans, M.G.L.C.

    2006-01-01

    This article reviews standards applied to operating room ventilation design used by European, South and North American countries. Required environmental parameters are compared with regard to type of surgery, and ventilation system. These requirements as well as their relation to infection control

  16. Operating experience of steam generator test facility

    International Nuclear Information System (INIS)

    Sureshkumar, V.A.; Madhusoodhanan, G.; Noushad, I.B.; Ellappan, T.R.; Nashine, B.K.; Sylvia, J.I.; Rajan, K.K.; Kalyanasundaram, P.; Vaidyanathan, G.

    2006-01-01

    Steam Generator (SG) is the vital component of a Fast Reactor. It houses both water at high pressure and sodium at low pressure separated by a tube wall. Any damage to this barrier initiates sodium water reaction that could badly affect the plant availability. Steam Generator Test Facility (SGTF) has been set up in Indira Gandhi Centre for Atomic Research (IGCAR) to test sodium heated once through steam generator of 19 tubes similar to the PFBR SG dimension and operating conditions. The facility is also planned as a test bed to assess improved designs of the auxiliary equipments used in Fast Breeder Reactors (FBR). The maximum power of the facility is 5.7 MWt. This rating is arrived at based on techno economic consideration. This paper covers the performance of various equipments in the system such as Electro magnetic pumps, Centrifugal sodium pump, in-sodium hydrogen meters, immersion heaters, and instrumentation and control systems. Experience in the system operation, minor modifications, overall safety performance, and highlights of the experiments carried out etc. are also brought out. (author)

  17. The Drop Tower Bremen -Experiment Operation

    Science.gov (United States)

    Könemann, Thorben; von Kampen, Peter; Rath, Hans J.

    The idea behind the drop tower facility of the Center of Applied Space Technology and Micro-gravity (ZARM) in Bremen is to provide an inimitable technical opportunity of a daily access to short-term weightlessness on earth. In this way ZARM`s european unique ground-based microgravity laboratory displays an excellent economic alternative for research in space-related conditions at low costs comparable to orbital platforms. Many national and international ex-perimentalists motivated by these prospects decide to benefit from the high-quality and easy accessible microgravity environment only provided by the Drop Tower Bremen. Corresponding experiments in reduced gravity could open new perspectives of investigation methods and give scientists an impressive potential for a future technology and multidisciplinary applications on different research fields like Fundamental Physics, Astrophysics, Fluid Dynamics, Combus-tion, Material Science, Chemistry and Biology. Generally, realizing microgravity experiments at ZARM`s drop tower facility meet new requirements of the experimental hardware and may lead to some technical constraints in the setups. In any case the ZARM Drop Tower Operation and Service Company (ZARM FAB mbH) maintaining the drop tower facility is prepared to as-sist experimentalists by offering own air-conditioned laboratories, clean rooms, workshops and consulting engineers, as well as scientific personal. Furthermore, ZARM`s on-site apartment can be used for accommodations during the experiment campaigns. In terms of approaching drop tower experimenting, consulting of experimentalists is mandatory to successfully accomplish the pursued drop or catapult capsule experiment. For this purpose there will be a lot of expertise and help given by ZARM FAB mbH in strong cooperation to-gether with the experimentalists. However, in comparison to standard laboratory setups the drop or catapult capsule setup seems to be completely different at first view. While defining a

  18. Operating experience and aging-seismic assessment of electric motors

    International Nuclear Information System (INIS)

    Subudhi, M.; Burns, E.L.; Taylor, J.H.

    1985-06-01

    Objectives of this program are to identify concerns related to the aging and service wear of equipment operating in nuclear power plants, to assess their possible impact on plant safety, to identify effective inspection surveillance and monitoring methods and to recommend suitable maintenance practices for mitigating aging related concerns and diminish the rate of degradation due to aging and service wear. Motor design and materials of construction are reviewed to identify age-sensitive components. Operational and accidental stressors are determined, and their effect on promoting aging degradation is assessed. Failure modes, mechanisms, and causes have been reviewed from operating experiences and existing data banks. The study has also included consideration for the seismic correlation of age-degraded motor components. The aforementioned reviews and assessments were assimilated to characterize the dielectric, rotational, and mechanical hazards on motor performance and operational readiness. The functional indicators which can be monitored to assess motor component deterioration due to aging or other accidental stressors are identified. Conforming with the NPAR strategy as outlined in the program plan, the study also includes a preliminary discussion of current standards and guides, maintenance programs, and research activities pertaining to nuclear power plant safety-related electric motors

  19. Small sodium valve design and operating experience

    International Nuclear Information System (INIS)

    Abramson, R.; Elie, X.; Vercasson, M.; Nedelec, J.

    1974-01-01

    Conventionally, valves for sodium pipes smaller than 125 mm in diameter are called ''small sodium valves''. However, this limit should rather be considered as the lower limit o ''large sodium valves''. In fact, both the largest sizes of small valves and the smallest of large valves can be found in the range of 125-300 mm in diameter. Thus what is said about small valves also applies, for a few valve types, above the 125 mm limit. Sodium valves are described here in a general manner, with no manufacturing details except when necessary for understanding valve behavior. Operating experience is pointed out wherever possible. Finally, some information is given about ongoing or proposed development plans. (U.S.)

  20. Operating Experiences of a Loss of Voltage Monitoring Program

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Eun-Chan [Korea Hydro and Nuclear Power Co. Ltd., Daejeon (Korea, Republic of)

    2015-10-15

    Loss of voltage (LOV) events continue to occur due to inadequate work management and random human errors. On February 26, 2015, regulators analyzed the root causes of LOV events and presented the results for the nuclear industry. Currently, KHNP uses a risk monitoring program, which is named 'LOV Monitor', for LOV prevention during pilot plant outages. This review introduces the operation experiences of LOV Monitor based on the evaluation results of a real event. The operation experiences of LOV Monitor in the pilot plants confirmed that this program could detect and reduce LOV possibilities from scheduling errors such as the simultaneous maintenance of energized trains and de-energized trains considering the physical conditions of the power circuit breakers. However, a maintenance culture that heeds the risk monitoring result must be strengthened in order to obtain substantial effects through applying LOV Monitor to the outage.

  1. Applying operating experience to design the CANDU 3 process

    International Nuclear Information System (INIS)

    Harris, D.S.; Hinchley, E.M.; Pauksens, J.; Snell, V.; Yu, S.K.W.

    1991-01-01

    The CANDU 3 is an advanced, smaller (450 MWe), standardized version of the CANDU now being designed for service later in the decade and beyond. The design of this evolutionary nuclear power plant has been carefully planned and organized to gain maximum benefits from new technologies and from world experience to date in designing, building, commissioning and operating nuclear power stations. The good performance record of existing CANDU reactors makes consideration of operating experience from these plants a particularly vital component of the design process. Since the completion of the first four CANDU 6 stations in the early 1980s, and with the continuing evolution of the multi-unit CANDU station designs since then, AECL CANDU has devised several processes to ensure that such feedback is made available to designers. An important step was made in 1986 when a task force was set up to review and process ideas arising from the commissioning and early operation of the CANDU 6 reactors which were, by that time, operating successfully in Argentina and Korea, as well as the Canadian provinces of Quebec and New Brunswick. The task force issued a comprehensive report which, although aimed at the design of an improved CANDU 6 station, was made available to the CANDU 3 team. By that time also, the Institute of Power Operations (INPO) in the U.S., of which AECL is a Supplier Participant member, was starting to publish Good Practices and Guidelines related to the review and the use of operating experiences. In addition, details of significant events were being made available via the INPO SEE-IN (Significant Event Evaluation and Information Network) Program, and subsequently the CANNET network of the CANDU Owners' Group (COG). Systematic review was thus possible by designers of operations reports, significant event reports, and related documents in a continuing program of design improvement. Another method of incorporating operations feedback is to involve experienced utility

  2. Applying operating experience to design the CANDU 3 process

    Energy Technology Data Exchange (ETDEWEB)

    Harris, D S; Hinchley, E M; Pauksens, J; Snell, V; Yu, S K.W. [AECL-CANDU, Ontario (Canada)

    1991-04-01

    The CANDU 3 is an advanced, smaller (450 MWe), standardized version of the CANDU now being designed for service later in the decade and beyond. The design of this evolutionary nuclear power plant has been carefully planned and organized to gain maximum benefits from new technologies and from world experience to date in designing, building, commissioning and operating nuclear power stations. The good performance record of existing CANDU reactors makes consideration of operating experience from these plants a particularly vital component of the design process. Since the completion of the first four CANDU 6 stations in the early 1980s, and with the continuing evolution of the multi-unit CANDU station designs since then, AECL CANDU has devised several processes to ensure that such feedback is made available to designers. An important step was made in 1986 when a task force was set up to review and process ideas arising from the commissioning and early operation of the CANDU 6 reactors which were, by that time, operating successfully in Argentina and Korea, as well as the Canadian provinces of Quebec and New Brunswick. The task force issued a comprehensive report which, although aimed at the design of an improved CANDU 6 station, was made available to the CANDU 3 team. By that time also, the Institute of Power Operations (INPO) in the U.S., of which AECL is a Supplier Participant member, was starting to publish Good Practices and Guidelines related to the review and the use of operating experiences. In addition, details of significant events were being made available via the INPO SEE-IN (Significant Event Evaluation and Information Network) Program, and subsequently the CANNET network of the CANDU Owners' Group (COG). Systematic review was thus possible by designers of operations reports, significant event reports, and related documents in a continuing program of design improvement. Another method of incorporating operations feedback is to involve experienced utility

  3. European clearinghouse on nuclear power plants operational experience feedback

    International Nuclear Information System (INIS)

    Ranguelova, Vesselina; Bruynooghe, Christiane; Noel, Marc

    2010-01-01

    Learning from operational experience and applying this knowledge promptly and intelligently is one of the ways to improve the safety of Nuclear Power Plant (NPP). Recent reviews of the effectiveness of Operational Experience Feedback (OEF) systems have pointed to the need for further improvement, with importance being placed on tailoring the information to the needs of the regulators. In 2007, at the request of a number of nuclear safety regulatory authorities in Europe, the Institute for Energy of the European Commission's Joint Research Centre (EC JRC) initiated a project on Nuclear Power Plant operational experience feedback, which adopts an integrated approach to the research needed to strengthen the European capabilities for assessment of NPP operational events and to promote the development of tools and mechanisms for the improved application of the lessons learned. Consequently, a so-called ''European Clearinghouse'' on NPP OEF was established, which includes scientific officers from the EC JRC, a number of European nuclear safety regulatory authorities and some of their Technical Support Organizations (TSOs). The paper discusses the activities implemented in 2008 within the framework of the European Clearinghouse on NPP OEF (hereinafter called the European NPP Clearinghouse) and provides an overview of the main conclusions drawn from the safety studies performed. Outlook of the activities carried out in 2009 are given. (orig.)

  4. Recent operating experience and improvement of commercial IGCC

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-09-01

    IGCC has today reached a status where experience is available from first and second generation plants, built in the 1970s/1980s and in the 1990s respectively, as commercial-scale demonstration plants for coal-based applications. These plants feature variations on gasification technology and subsequent environmental controls and in operating them a number of technical and commercial lessons have been learned that will help to improve the next generation of IGCC projects. The report reviews and summarises the state-of-the-art and operating experience of several commercial IGCC plants worldwide, setting out the lessons learned and plans for future development embracing such issues as the changes or modifications to plant made to overcome the operational problems and to improve the reliability and availability of the plant. Since IGCC is considered a 'capture ready' technology for CO2 abatement, the current status with regard to the incorporation of carbon capture and storage systems (CCS) has been reviewed. Finally, the report outlines the issues associated with assessing the risks in commercialising IGCC plant.

  5. Medical supply on contingency military operations: experience from Operation GRITROCK.

    Science.gov (United States)

    Robinson, J P; Reeves, P

    2015-01-01

    Medical supply during military operations has the ability to affect the efficacy of the operation being undertaken, either negatively or positively. An appropriately-managed maritime platform with a robust medical supply chain during transit and on arrival in theatre is the main aim. A secure supply chain will reduce any implications that logistics may have with regard to capability, and negate the effects of deficiencies of short shelf life items occurring over time and during use in high tempo operations.

  6. Operating experience feedback report - Solenoid-operated valve problems

    International Nuclear Information System (INIS)

    Ornstein, H.L.

    1991-02-01

    This report highlights significant operating events involving observed or potential common-mode failures of solenoid-operated valves (SOVs) in US plants. These events resulted in degradation or malfunction of multiple trains of safety systems as well as of multiple safety systems. On the basis of the evaluation of these events, the Office for Analysis and Evaluation of Operational Data (AEOD) of the US Nuclear Regulatory Commission (NRC) concludes that the problems with solenoid-operated valves are an important issue that needs additional NRC and industry attention. This report also provides AEOD's recommendations for actions to reduce the occurrence of SOV common-mode failures. 115 refs., 7 figs., 2 tabs

  7. Synthetic vision systems: operational considerations simulation experiment

    Science.gov (United States)

    Kramer, Lynda J.; Williams, Steven P.; Bailey, Randall E.; Glaab, Louis J.

    2007-04-01

    Synthetic vision is a computer-generated image of the external scene topography that is generated from aircraft attitude, high-precision navigation information, and data of the terrain, obstacles, cultural features, and other required flight information. A synthetic vision system (SVS) enhances this basic functionality with real-time integrity to ensure the validity of the databases, perform obstacle detection and independent navigation accuracy verification, and provide traffic surveillance. Over the last five years, NASA and its industry partners have developed and deployed SVS technologies for commercial, business, and general aviation aircraft which have been shown to provide significant improvements in terrain awareness and reductions in the potential for Controlled-Flight-Into-Terrain incidents / accidents compared to current generation cockpit technologies. It has been hypothesized that SVS displays can greatly improve the safety and operational flexibility of flight in Instrument Meteorological Conditions (IMC) to a level comparable to clear-day Visual Meteorological Conditions (VMC), regardless of actual weather conditions or time of day. An experiment was conducted to evaluate SVS and SVS-related technologies as well as the influence of where the information is provided to the pilot (e.g., on a Head-Up or Head-Down Display) for consideration in defining landing minima based upon aircraft and airport equipage. The "operational considerations" evaluated under this effort included reduced visibility, decision altitudes, and airport equipage requirements, such as approach lighting systems, for SVS-equipped aircraft. Subjective results from the present study suggest that synthetic vision imagery on both head-up and head-down displays may offer benefits in situation awareness; workload; and approach and landing performance in the visibility levels, approach lighting systems, and decision altitudes tested.

  8. Synthetic Vision Systems - Operational Considerations Simulation Experiment

    Science.gov (United States)

    Kramer, Lynda J.; Williams, Steven P.; Bailey, Randall E.; Glaab, Louis J.

    2007-01-01

    Synthetic vision is a computer-generated image of the external scene topography that is generated from aircraft attitude, high-precision navigation information, and data of the terrain, obstacles, cultural features, and other required flight information. A synthetic vision system (SVS) enhances this basic functionality with real-time integrity to ensure the validity of the databases, perform obstacle detection and independent navigation accuracy verification, and provide traffic surveillance. Over the last five years, NASA and its industry partners have developed and deployed SVS technologies for commercial, business, and general aviation aircraft which have been shown to provide significant improvements in terrain awareness and reductions in the potential for Controlled-Flight-Into-Terrain incidents/accidents compared to current generation cockpit technologies. It has been hypothesized that SVS displays can greatly improve the safety and operational flexibility of flight in Instrument Meteorological Conditions (IMC) to a level comparable to clear-day Visual Meteorological Conditions (VMC), regardless of actual weather conditions or time of day. An experiment was conducted to evaluate SVS and SVS-related technologies as well as the influence of where the information is provided to the pilot (e.g., on a Head-Up or Head-Down Display) for consideration in defining landing minima based upon aircraft and airport equipage. The "operational considerations" evaluated under this effort included reduced visibility, decision altitudes, and airport equipage requirements, such as approach lighting systems, for SVS-equipped aircraft. Subjective results from the present study suggest that synthetic vision imagery on both head-up and head-down displays may offer benefits in situation awareness; workload; and approach and landing performance in the visibility levels, approach lighting systems, and decision altitudes tested.

  9. How operational issues impact science peer review

    Science.gov (United States)

    Blacker, Brett S.; Golombek, Daniel; Macchetto, Duccio

    2006-06-01

    In some eyes, the Phase I proposal selection process is the most important activity handled by the Space Telescope Science Institute (STScI). Proposing for HST and other missions consists of requesting observing time and/or archival research funding. This step is called Phase I, where the scientific merit of a proposal is considered by a community based peer-review process. Accepted proposals then proceed thru Phase II, where the observations are specified in sufficient detail to enable scheduling on the telescope. Each cycle the Hubble Space Telescope (HST) Telescope Allocation Committee (TAC) reviews proposals and awards observing time that is valued at $0.5B, when the total expenditures for HST over its lifetime are figured on an annual basis. This is in fact a very important endeavor that we continue to fine-tune and tweak. This process is open to the science community and we constantly receive comments and praise for this process. In this last year we have had to deal with the loss of the Space Telescope Imaging Spectrograph (STIS) and move from 3-gyro operations to 2-gyro operations. This paper will outline how operational issues impact the HST science peer review process. We will discuss the process that was used to recover from the loss of the STIS instrument and how we dealt with the loss of 1/3 of the current science observations. We will also discuss the issues relating to 3-gyro vs. 2-gyro operations and how that changes impacted Proposers, our in-house processing and the TAC.

  10. Stabilisation and stability operations : a Literature Review

    OpenAIRE

    Fitz-Gerald, AM; Blair, S

    2010-01-01

    ‘Stabilisation’, ‘stability operations’ and ‘instability’ are relatively new terms in the conflict transformation lexicon and the literature on these areas has grown significantly over a fairly short time period. For better or for worse, knowledge in this area has been shaped predominantly by the formative experiences in Afghanistan and Iraq. These operations are based on a view that weak and failing states pose a direct threat to wider international and national security. T...

  11. Lessons Learned from Missing Flooding Barriers Operating Experience

    International Nuclear Information System (INIS)

    Simic, Z.; Veira, M. P.

    2016-01-01

    Flooding hazard is highly significant for nuclear power plant safety because of its potential for common cause impact on safety related systems, and because operating experience reviews regularly identify flooding as a cause of concern. Source of the flooding could be external (location) or internal (plant design). The amount of flooding water could vary but even small amount might suffice to affect redundant trains of safety related systems for power supply and cooling. The protection from the flooding is related to the design-basis flood level (DBFL) and it consists of three elements: structural, organizational and accessibility. Determination of the DBFL is critical, as Fukushima Daiichi accident terribly proved. However, as the topic of flooding is very broad, the scope of this paper is focused only on the issues related to the missing flood barriers. Structural measures are physically preventing flooding water to reach or damage safety related system, and they could be permanent or temporary. For temporary measures it is important to have necessary material, equipment and organizational capacity for the timely implementation. Maintenance is important for permanent protection and periodical review is important for assuring readiness and feasibility of temporary flooding protection. Final flooding protection element is assured accessibility to safety related systems during the flooding. Appropriate flooding protection is based on the right implementation of design requirements, proper maintenance and periodic reviews. Operating experience is constantly proving how numerous water sources and systems interactions make flooding protection challenging. This paper is presenting recent related operating experience feedback involving equipment, procedures and analysis. Most frequent deficiencies are: inadequate, degraded or missing seals that would allow floodwaters into safety related spaces. Procedures are inadequate typically because they underestimate necessary

  12. Peer Reviews: a voluntary means of enhancing operating culture

    International Nuclear Information System (INIS)

    Vella, R.

    1996-01-01

    In the nuclear energy industry, and also in other fields, excellent experience has been gained from the regular accumulation of expert evidence of power station operation through external organizations or teams. In 1991, the World Association of Nuclear Operations (WANO) initiated a pilot programme for voluntary 'Peer Reviews'. The success of this first exercise in gathering expert evidence led to the introduction of the 'Peer Review' programme in 1993 as one of the standard programmes of WANO. The object was to increase the safety and reliability of nuclear power stations throughout the world. WANO Peer Reviews are voluntary and are carried out at the request of a member. They are oriented towards special WANO performance objectives and criteria, which have been established by the management of WANO. (orig.) [de

  13. USA/FBR program status FFTF operations startup experience

    International Nuclear Information System (INIS)

    Moffitt, W.C.; Izatt, R.D.

    1981-06-01

    This paper gives highlights of the major Operations evaluations and operational results of the startup acceptance testing program and initiation of normal operating cycles for experiment irradiation in the FFTF. 33 figures

  14. Evaluation of German and international operating experience

    International Nuclear Information System (INIS)

    Stueck, Reinhard; Verstegen, Claus

    2014-01-01

    The systematic analysis of safety-relevant events in nuclear power plants and their causes is a key driver for the further development of nuclear safety. The findings obtained from the evaluation of operating experience in this respect form the basis for both technical and organisational improvements in the plants as well as for adaptations of technical rules and standards. In its role as Technical Safety Organisation advising the German federal government, Gesellschaft fuer Anlagen- und Reaktorsicherheit (GRS) has been concerned with the detection and analysis of failure mechanisms that underlie events in nuclear power plants at home and abroad since its foundation in 1977. This article provides an overview of the different objectives which are pursued in this context by order of or funded by the Federal Environment Ministry. Here, the focus is on the evaluation of reportable events for the preparation of so-called Information Notices and generic reports as well as for the acquisition of data that can be used for in-depth probabilistic analyses.

  15. Proposed Reactor Operating Experience Feedback System Development

    International Nuclear Information System (INIS)

    Ahn, Seung Hoon; Kim, Min Chul; Huh, Chang Wook; Lee, Durk Hun; Bae, Koo Hyun

    2006-01-01

    Most events occurring in nuclear power plants are not individually significant, and prevented from progressing to accident conditions by a series of barriers against core damage and radioactive releases. Significant events, if occur, are almost always a breach of these multiple barriers. As illustrated in the 'Swiss cheese' model, the individual layers of defense or 'cheese slices' have weakness or 'holes.' These weaknesses are inconstant, i.e., the holes are open or close at random. When by chance all the holes are aligned, a hazard causes the significant event of concern. Elements of low significant events, inattention to detail, time or economic pressure, uncorrected poor practices/habits, marginal maintenance and equipment care, etc., make holes in the layers of defense; some elements may make more holes in different layers, incurring more chances to be aligned. An effective reduction of the holes, therefore, is gained through better knowledge or awareness of increasing trends of the event elements, followed by appropriate actions. According to the Swiss cheese metaphor, attention to the Operating Experience (OE) feedback system, as opposed to the individual and to randomness, is drawn from a viewpoint of reactor safety

  16. Canadian fuel development program and recent operational experience

    International Nuclear Information System (INIS)

    Cox, D.S.; Kohn, E.; Lau, J.H.K.; Dicke, G.J.; Macici, N.N.; Sancton, R.W.

    1995-01-01

    This paper provides an overview of the current Canadian CANDU fuel R and D programs and operational experience. The details of operational experience for fuel in Canadian reactors are summarized for the period 1991-1994; excellent fuel performance has been sustained, with steady-state bundle defect rates currently as low as 0.02%. The status of introducing long 37-element bundles, and bundles with rounded bearing pads is reviewed. These minor changes in fuel design have been selectively introduced in response to operational constraints (end-plate cracking and pressure-tube fretting) at Ontario Hydro's Bruce-B and Darlington stations. The R and D programs are generating a more complete understanding of CANDU fuel behaviour, while the CANDU Owners Group (COG) Fuel Technology Program is being re-aligned to a more exclusive focus on the needs of operating stations. Technical highlights and realized benefits from the COG program are summarized. Re-organization of AECL to provide a one-company focus, with an outward looking view to new CANDU markets, has strengthened R and D in advanced fuel cycles. Progress in AECL's key fuel cycle programs is also summarized. (author)

  17. Application of operating experience in environmental qualification program

    International Nuclear Information System (INIS)

    Lee, S.Y.; Wise, R.

    2000-01-01

    Environmental qualification (EQ) of equipment related to nuclear safety has been carried out in the nuclear community since the 70's. It started with electrical equipment and then expanded to include mechanical equipment. During this evolutionary process, the methods used for EQ have gone through a long period of refinement and clarification. Prior to 1971, qualification for equipment in licensed nuclear power plants was based on the use of electrical components of commonly accepted high industrial quality without the benefit of specific environmental qualification standards. Between 1971 and 1974, most plants used the criteria of IEEE Standard 323-1971 as the basis for demonstrating qualification. Also during this period related 'daughter' standards, mainly by IEEE, became available which addressed qualification for specific equipment items. After July 1974, plants were required to meet the more comprehensive guidelines specified in IEEE Standard 323-1974 and the related 'daughter' standards. IEEE Standard 323-1974 later evolved into IEEE Standard 323-1983. For nuclear power plants built in Ontario during the 70's, i.e. Pickering B and Bruce B, has included the environmental qualification requirements in their respective nuclear safety design guides. It is now recognized that they are not up to the current EQ standards. Darlington, constructed during the 80's, implemented the environmental qualification program in its project. An Environmental Qualification (EQ) Program is now under way in Ontario Power Generation (OPG) to formally implement the Environmental Qualification for Bruce B, Pickering B, and Pickering A and to preserve the Qualification for Darlington G.S. This paper makes a thorough a review of the standard methods used in the past by utilities for environmental qualification. These methods include type testing, analysis, and operating experience. Both type testing and analysis have been clearly defined in standards listed in References [2] to [6] and

  18. Program of experiments for the operating phase of the Underground Research Laboratory

    International Nuclear Information System (INIS)

    Simmons, G.R.; Bilinsky, D.M.; Davison, C.C.; Gray, M.N.; Kjartanson, B.H.; Martin, C.D.; Peters, D.A.; Lang, P.A.

    1992-09-01

    The Underground Research Laboratory (URL) is one of the major research and development facilities that AECL Research has constructed in support of the Canadian Nuclear Fuel Waste Management Program. The URL is a unique geotechnical research facility constructed in previously undisturbed plutonic rock, which was well characterized before construction. The site evaluation and construction phases of the URL project have been completed and the operating phase is beginning. A program of operating phase experiments that address AECL's objectives for in situ testing has been selected. These experiments were subjected to an external peer review and a subsequent review by the URL Experiment Committee in 1989. The comments from the external peer review were incorporated into the experiment plans, and the revised experiments were accepted by the URL Experiment Committee. Summaries of both reviews are presented. The schedule for implementing the experiments and the quality assurance to be applied during implementation are also summarized. (Author) (9 refs., 11 figs.)

  19. Operating experience with existing light sources

    International Nuclear Information System (INIS)

    Barton, M.Q.

    1985-01-01

    It is instructive to consider what an explosive growth there has been in the development of light sources using synchrotron radiation. This is well illustrated by the list of facilities given in Table I. In many cases, synchrotron light facilities have been obtained by tacking on parasitic beam lines to rings that were built for high energy physics. Of the twenty-three facilities in this table, however, eleven were built explicitely for this synchrotron radiation. Another seven have by now been converted for use as dedicated facilities leaving only five that share time with high energy physics. These five parasitically operated facilities are still among our best sources of hard x-rays, however, and their importance to the fields of science where these x-rays are needed must be emphasized. While the number of facilities in this table is impressive, it is even more impressive to add up the total number of user beam lines. Most of these rings are absolutely surrounded by beam lines and finding real estate on the experimental floor of one of these facilities for adding a new experiment looks about as practical as adding a farm in the middle of Manhattan. Nonetheless, the managers of these rings seem to have an attitude of ''always room for one more'' and new experimental beam lines do appear. This situation is necessary because the demand for beam time has exploded at an even faster rate than the development of the facilities. The field is not only growing, it can be expected to continue to grow for some time. Some of the explicit plans for future development will be discussed in the companion paper by Lee Teng

  20. Survey of operating experience from LERs to identify aging trends

    International Nuclear Information System (INIS)

    Murphy, G.A.

    1985-01-01

    The results of a study using the Oak Ridge National Laboratory's Nuclear Operations Analysis Center computer files of operating experience reports [licensee event reports (LERs), abnormal occurrences, etc.] are summarized in this study, specific time-related degradation mechanisms are identified as possible causes of a reportable occurrence. Data collected on domestic commercial nuclear power plants covering 1969 to 1982 yielded over 5800 events attributable to possible age related failures. Of these events, 2795 were attributable to instrument drift and are addressed separately in the report. The remaining events (3098) were reviewed, and data were collected for each event, which identified the specific system, component, and subpart: the information included the age-related mechanism, severity of the failure, and method of detection of the failure. About two-thirds of the failures were judged to be degraded, with one-third listed as catastrophic

  1. Defense waste processing facility radioactive operations. Part 1 - operating experience

    International Nuclear Information System (INIS)

    Little, D.B.; Gee, J.T.; Barnes, W.M.

    1997-01-01

    The Savannah River Site's Defense Waste Processing Facility (DWPF) near Aiken, SC is the nation's first and the world's largest vitrification facility. Following a ten year construction program and a 3 year non-radioactive test program, DWPF began radioactive operations in March 1996. This paper presents the results of the first 9 months of radioactive operations. Topics include: operations of the remote processing equipment reliability, and decontamination facilities for the remote processing equipment. Key equipment discussed includes process pumps, telerobotic manipulators, infrared camera, Holledge trademark level gauges and in-cell (remote) cranes. Information is presented regarding equipment at the conclusion of the DWPF test program it also discussed, with special emphasis on agitator blades and cooling/heating coil wear. 3 refs., 4 figs

  2. Treatment of operational experience of nuclear power plants in WANO

    International Nuclear Information System (INIS)

    Ibanez, M.

    2013-01-01

    The article describes the activities associated to the Operating Experience Programme of the World Association of Nuclear Operators. The programme manages the event reports submitted by the nuclear power plants to the WANO database for the preparation by the Operating Experience Central Team of some documents like the significant Operating Experience Reports and Significant Event Reports that help the stations to avoid similar events. (Author)

  3. Operational Art and the ADF Experience

    Science.gov (United States)

    2017-05-25

    Joint operations; 9. Distributed free maneuver; 10. The continuous front; 11. The empty battlefield; and 12. Commanders exercising operational vision...and purpose. The value of this analogy is that it demonstrates that operational art involves both sides of the issue, strategy and tactics...Objectives.” Speech , The International Conference on the Afghanistan Conflict and Australia’s Role, October 22-23, 2009, accessed December 06, 2016, http

  4. Experience in operation and maintenance of PWRs

    International Nuclear Information System (INIS)

    Broecker, H.; Schomer, E.

    1987-01-01

    At present there are 10 PWRs in operation, most of them built on turnkey basis by KWU. The availability of West German PWRs amounted to 84.7% on average for the period from 1982-86. The good operating results are attributable to the following: 1. Sophiticated design and layout of the plant with good accessibility to the primary system even during operation. 2. Reliable performance of plant and components as result of extensive quality assurance. 3. Well-organized and highly qualified operating personnel. 4. Inservice inspection and preventive maintenance. 5. Good information feedback system. (Liu)

  5. Cluff Lake mill operations - a historical review

    International Nuclear Information System (INIS)

    Schnell, H.A.; Doell, E.; Corpus, E.

    2000-01-01

    The Cluff Lake operation started uranium production in 1980 and has produced over 50 million pounds of uranium since that time. The plant started with high grade ore (+30% U) processing and went through a series of modifications to its present operating status: Phase 1 - High-grade ore (+30% U) processing with acid leach and iron cake precipitation followed by direct yellowcake precipitation. Lower grade ore was concentrated in a gravity circuit to +30% U; Phase 1 1/2 - Reprocessing Phase 1 gravity tailings (+1% U) in an acid leach circuit with solvent extraction purification prior to yellowcake precipitation; Reprocessing of the Phase 1 leach tails (58 g/t Au) to recover gold in a Cyanide/CIP circuit followed by additional uranium recovery, and destruction and recycle of cyanide by volatilization; and Phase 2 - Treatment of the lower grade ore (0.5 to 1% U) at an increased tonnage with an acid leach, CCD, SX circuit as it is found in the existing plant. This paper will review the various processing circuits used during the phases of the Cluff Lake Mill from first uranium production to the present operation. (author)

  6. The tritium operations experience on TFTR

    International Nuclear Information System (INIS)

    Halle, A. von; Anderson, J.L.; Gentile, C.; Grisham, L.; Hosea, J.; Kamperschroer, J.; LaMarche, P.; Oldaker, M.; Nagy, A.; Raftopoulos, S.; Stevenson, T.

    1995-01-01

    The Tokamak Fusion Test Reactor (TFTR) tritium gas system is administratively limited to 5 grams of tritium and provides the feedstock gas for the neutral beam and torus injection systems. Tritium operations on TFTR began with leak checking of gas handling systems, qualification of the gas injection systems, and high power plasma operations using trace amounts of tritium in deuterium feedstock gas. Full tritium operation commenced with four highly diagnosed neutral beam pulses into a beamline calorimeter to verify planned tritium beam operating routines and to demonstrate the deuterium to tritium beam isotope exchange. Since that time, TFTR has successfully operated each of the twelve neutral beam ion sources in tritium during hundreds of tritium beam pulses and torus gas injections. This paper describes the TFTR tritium gas handling systems and TFTR tritium operations of the gas injection systems and the neutral beam ion sources. Tritium accounting and accountability is discussed, including tritium retention issues of the torus limiters and beam impinged surfaces of the beamline components. Also included is tritium beam velocity analysis that compares the neutral beam extracted ion species composition for deuterium and tritium and that determines the extent of beam isotope exchange on subsequent deuterium and tritium beam pulses. The required modifications to TFTR operating routines to meet the U.S. Department of Energy regulations for a low hazard nuclear facility and the problems encountered during initial tritium operations are described. (orig.)

  7. The tritium operations experience on TFTR

    International Nuclear Information System (INIS)

    von Halle, A.; Gentile, C.

    1994-01-01

    The Tokamak Fusion Test Reactor (TFTR) tritium gas system is administratively limited to 5 grains of tritium and provides the feedstock gas for the neutral beam and torus injection systems. Tritium operations on TFTR began with leak checking of gas handling systems, qualification of the gas injection systems, and high power plasma operations using using trace amounts of tritium in deuterium feedstock gas. Full tritium operation commenced with four highly diagnosed neutral beam pulses into a beamline calorimeter to verify planned tritium beam operating routines and to demonstrate the deuterium to tritium beam isotope exchange. Since that time, TFTR has successfully operated each of the twelve neutral beam ion sources in tritium during hundreds of tritium beam pulses and torus gas injections. This paper describes- the TFTR tritium gas handling systems and TFTR tritium operations of the gas injection systems and the neutral beam ion sources. Tritium accounting and accountability is discussed, including tritium retention issues of the torus limiters and beam impinged surfaces of the beamline components. Also included is tritium beam velocity analysis that compares the neutral beam extracted ion species composition for deuterium and tritium and that determines the extent of beam isotope exchange on subsequent deuterium and tritium beam pulses. The required modifications to TFTR operating routines to meet the US Department of Energy regulations for a low hazard nuclear facility and the problems encountered during initial tritium operations are described

  8. Review of operational aids for nuclear plant operators

    International Nuclear Information System (INIS)

    Kisner, R.A.

    1983-01-01

    Many approaches are being explored to improve the safety of nuclear plant operations. One approach is to supply high-quality, relevant information by means of computer-based diagnostic systems to assist plant operators in performing their operational and safety-related roles. The evaluation of operational aids to ensure safe plant operations is a necessary function of NRC. This work has two purposes: to collect limited data on a diversity of operational aids, and to provide a method for evaluating the safety implications of the functions of proposed operational aids. After a discussion of the method evaluation now under study, this paper outlines this data collection to date

  9. Recent operational experiments at the LANSCE facility

    Energy Technology Data Exchange (ETDEWEB)

    Rybarcyk, Lawrence J [Los Alamos National Laboratory

    2010-09-15

    The Los Alamos Neutron Science Center (LANSCE) consists of a pulsed 800-MeV room-temperature linear accelerator and an 800-MeV accumulator ring. It simultaneously provides H{sup +} and H{sup -} beams to several user facilities that have their own distinctive requirements, e.g. intensity, chopping pattern, duty factor, etc.. This multibeam operation presents challenges both from the standpoint of meeting the individual requirements but also achieving good overall performance for the integrated operation. Various aspects of more recent operations including the some of these challenges will be discussed.

  10. Operating experience at Scottish Nuclear's power stations

    International Nuclear Information System (INIS)

    Blackburn, P.

    1991-01-01

    A brief history is presented of the design and operation of the four Scottish nuclear power stations currently run by Scottish Nuclear, namely Hunterston 'A' and 'B' and the Torness reactors. A design flaw in the Magnox reactor at Hunterston 'A' led to it being operated at lower than optimal temperature and hence producing less power. For Hunterston 'B' reactor the Advanced Gas Cooled design prototype was used. Operating setbacks and successes are noted. The design chosen for Torness embraced all the good points of Hunterston 'B' but sought to eliminate its faults. After 26 years of successful operation Hunterston 'A' is now being decommissioned, while the other three stations continue to generate electricity successfully. (UK)

  11. Phobos L1 Operational Tether Experiment (PHLOTE)

    Data.gov (United States)

    National Aeronautics and Space Administration — A sensor package that “floats” just above the surface of Phobos, suspended by a tether from a small spacecraft operating at the Mars/Phobos Lagrange 1 (L1) Point...

  12. Operating experience of Fugen Nuclear Power Station

    International Nuclear Information System (INIS)

    Ohteru, Shigeru; Kaneko, Jun; Kawahara, Toshio; Matsumoto, Mitsuo

    1987-01-01

    The prototype ATR 'Fugen' developed as one of the national project has verified the performance and reliability of the advanced thermal reactor system through the operation for about eight years since 1979, and the elucidation of the characteristics in plutonium utilization and the development and verification of the tuilizing techniques have been advanced. Besides, the operational results and the achievement of the technical development are successively reflected to the design of a demonstration reactor. In this paper, the outline of Fugan and the operational results are reported. The ATR Fugen Power Station is that of the prototype reactor of heavy water moderated, boiling light water cooled, pressure tube type, having the electric output of 165 MW. It started the full scale operation on March 20, 1979, and as of January, 1987, the total generated electric power reached about 7 billion kWh, the time of power generation was about 43,000 h, and the average capacity factor was 60.6 %. Plutonium utilization techniques, the flow characteristics and the dynamic plant characteristics of a pressure tube type reactor, the operational characteristics of a heavy water system and the techniques of handling heavy water containing tritium, and the operational reliability and maintainability of the machinery and equipment installed have been studied. (Kako, I.)

  13. Five years of operating experience with Phenix

    International Nuclear Information System (INIS)

    Conte, F.

    1980-01-01

    The construction of Phenix began at the end of 1968; the unit first went critical on August 31 st, 1973, and it was first connected to the grid of Electricite de France on 31st December 1973. It started operating industrially on July 14th, 1974. The balance sheet after five years of operations is as follows: Gross thermal capacity: 590 MW; Grosss electric capacity: 264 MW; Gross capacity factor of the power station: 45%; Gross electrical power produced by 30th september 1979: more than six billion kWh. In 1976 and 1977 the operation of the plant was affected by modifications made to the intermediate heat exchangers following leaks discovered in October 1976. Since 1976 the plants has been working at full capacity and the availability rate during the period July 1978 - July 1979 was more than 80% [fr

  14. Vapour trap development and operational experience

    International Nuclear Information System (INIS)

    Jansing, W.; Kirchner, G.; Menck, J.

    1977-01-01

    Sodium aerosols have the unpleasant characteristic that they deposit at places with low temperature level. This effect can be utilized when sodium aerosols are to be trapped at places which are determined beforehand. Thus vapour traps were developed which can filter sodium vapour from the cover gas. By this means the necessity was eliminated to heat all gas lines and gas systems with trace heaters just as all sodium lines are heated. It was of special interest for the INTERATOM to develop vapour traps which must not be changed or cleaned after a certain limited operating period. The vapour traps were supposed to enable maintenance free operation, i.e. they were to operate 'self cleaning'

  15. Commonwealth Edison operating experience: the people factor

    International Nuclear Information System (INIS)

    Soth, L.

    1983-01-01

    Since 1955, Commonwealth Edison's nuclear commitment has evolved into three operating stations, another in startup, and two more under construction. Paralleling this evolution has been the investment in the personnel resources to operate, maintain, and manage these facilities. The personnel resource, its training and development, is the foundation for safe operation at any nuclear plant - the people factor. The personnel requirement at Edison has expanded and evolved with each station to meet ever increasing regulatory requirements. An extensive training organization has been developed to emphasize the importance of the man side of the human factors man/machine interface. Personnel errors are investigated to identify and correct the root causes, and outstanding personnel performance is recognized by the Company

  16. Operating experiences in fuel handling system at KGS

    International Nuclear Information System (INIS)

    Reddy, G.P.; Nagabhushanam

    2006-01-01

    Refuelling operations were started at KGS in August, 2000. Rich and varied experience was gained during this period through internal discussion/Quality circles/Procedural reviews and analysis of various incidents that have taken place in KGS and other units of NPCIL Some of the unique jobs carried out at KGS include-Development of tools for in-situ replacement of FM front end cover in FM service area (which was done for the first time in NPCIL history), Modification of FM magazine rear end plate mounting screws to avoid the possibility of magazine rotation stalling, The incident of Stalling of B-Ram during installation of upstream shield plug in KGS - 1 has brought out many weakness that were existing in the system in a dormant manner. Review of maintenance procedures was carried out and a special underwater operated sensor was developed and installed in Transfer Magazine to sense the presence and proper positioning of fuel bundles in the Transfer magazine tube during fuel loading operation. Numerous modifications were carried out in the system to increase equipment reliability, ease of operation and maintenance, to reduce man-rem consumption. Most notable among these modifications include -zig saw panel modification, EFCV O-ring modification, Ram BF switch modification, provision for increase in SFSB level provision, snout clamp oil circuit modification, ball valve actuator modification, installation of additional switch for sensing STS carriage UP position etc, This paper focuses on the challenges tackled in achieving near perfect performance, innovations and improvements carried out in the system to strive for this goal and development of procedures for reducing man-rem consumption and life extension of critical components. (author)

  17. Impact of LMFBR operating experience on PFBR design

    International Nuclear Information System (INIS)

    Bhoje, S.B.; Chetal, S.C.; Chellapandi, P.; Govindarajan, S.; Lee, S.M.; Kameswara Rao, A.S.L.; Prabhakar, R.; Raghupathy, S.; Sodhi, B.S.; Sundaramoorthy, T.R.; Vaidyanathan, G.

    2000-01-01

    PFBR is a 500 MWe, sodium cooled, pool type, fast breeder reactor currently under detailed design. It is essential to reduce the capital cost of PFBR in order to make it competitive with thermal reactors. Operating experience of LMFBRs provides a vital input towards simplification of the design, improving its reliability, enhancing safety and achieving overall cost reduction. This paper includes a summary of LMFBR operating experience and details the design features of PFBR as influenced by operating experience of LMFBRs. (author)

  18. Operating experience feedback report - Air systems problems

    International Nuclear Information System (INIS)

    Ornstein, H.L.

    1987-12-01

    This report highlights significant operating events involving observed or potential failures of safety-related systems in U.S. plants that resulted from degraded or malfunctioning non-safety grade air systems. Based upon the evaluation of these events, the Office for Analysis and Evaluation of Operational Data (AEOD) concludes that the issue of air systems problems is an important one which requires additional NRC and industry attention. This report also provides AEOD's recommendations for corrective actions to deal with the issue. (author)

  19. Operating experience with KRAFTWERK UNION cementation line

    International Nuclear Information System (INIS)

    Podmaka, L.; Tomik, L.

    1988-01-01

    A facility is described designed for fixation in a cement matrix of the radioactive concentrate produced by thickening waste water from the Bohunice nuclear power plant. The cementation line output is 0.6 m 3 concentrate/h. The concentrate is put in 200 l drums. The individual operating units, cement management, air conditioning, dosimetric monitoring and the building part are described. The requirements for the operators and the assessment of the quality of raw materials and the product are discussed. (M.D.). 3 figs., 4 refs

  20. Operational Experience with the CMS Pixel Detector

    CERN Document Server

    INSPIRE-00205212

    2015-05-15

    In the first LHC running period the CMS-pixel detector had to face various operational challenges and had to adapt to the rapidly changing beam conditions. In order to maximize the physics potential and the quality of the data, online and offline calibrations were performed on a regular basis. The detector performed excellently with an average hit efficiency above 99\\% for all layers and disks. In this contribution the operational challenges of the silicon pixel detector in the first LHC run and the current long shutdown are summarized and the expectations for 2015 are discussed.

  1. Vascular Trauma Operative Experience is Inadequate in General Surgery Programs.

    Science.gov (United States)

    Yan, Huan; Maximus, Steven; Koopmann, Matthew; Keeley, Jessica; Smith, Brian; Virgilio, Christian de; Kim, Dennis Y

    2016-05-01

    Vascular injuries may be challenging, particularly for surgeons who have not received formal vascular surgery fellowship training. Lack of experience and improper technique can result in significant complications. The objective of this study was to examine changes in resident experience with operative vascular trauma over time. A retrospective review was performed using Accreditation Council for Graduate Medical Education (ACGME) case logs of general surgery residents graduating between 2004 and 2014 at 2 academic, university-affiliated institutions associated with level 1 trauma centers. The primary outcome was number of reported vascular trauma operations, stratified by year of graduation and institution. A total of 112 residents graduated in the study period with a median 7 (interquartile range 4.5-13.5) vascular trauma cases per resident. Fasciotomy and exposure and/or repair of peripheral vessels constituted the bulk of the operative volume. Linear regression showed no significant trend in cases with respect to year of graduation (P = 0.266). Residents from program A (n = 53) reported a significantly higher number of vascular trauma cases when compared with program B (n = 59): 12.0 vs. 5.0 cases, respectively (P < 0.001). Level 1 trauma center verification does not guarantee sufficient exposure to vascular trauma. The operative exposure in program B is reflective of the national average of 4.0 cases per resident as reported by the ACGME, and this trend is unlikely to change in the near future. Fellowship training may be critical for surgeons who plan to work in a trauma setting, particularly in areas lacking vascular surgeons. Copyright © 2016 Elsevier Inc. All rights reserved.

  2. Annual meeting on nuclear technology 1980. Technical meeting: Operating experiences

    International Nuclear Information System (INIS)

    1980-01-01

    In addition to general experiences, experiences in reactor operation with relation to the Phenix reactor, KNK-2 reactor, the AVR reactor, the BWR-type KKI-reactor, the Philippsburg-1 reactor and the Obrigheim reactor are described. (DG) [de

  3. Halden fuel and material experiments beyond operational and safety limits

    International Nuclear Information System (INIS)

    Volkov, Boris; Wiesenack, Wolfgang; McGrath, M.; Tverberg, T.

    2014-01-01

    One of the main tasks of any research reactor is to investigate the behavior of nuclear fuel and materials prior to their introduction into the market. For commercial NPPs, it is important both to test nuclear fuels at a fuel burn-up exceeding current limits and to investigate reactor materials for higher irradiation dose. For fuel vendors such tests enable verification of fuel reliability or for the safety limits to be found under different operational conditions and accident situations. For the latter, in-pile experiments have to be performed beyond some normal limits. The program of fuel tests performed in the Halden reactor is aimed mainly at determining: The thermal FGR threshold, which may limit fuel operational power with burn-up increase, the “lift-off effect” when rod internal pressure exceeds coolant pressure, the effects of high burn-up on fuel behavior under power ramps, fuel relocation under LOCA simulation at higher burn-up, the effect of dry-out on high burn-up fuel rod integrity. This paper reviews some of the experiments performed in the Halden reactor for understanding some of the limits for standard fuel utilization with the aim of contributing to the development of innovative fuels and cladding materials that could be used beyond these limits. (author)

  4. The relationship of previous training and experience of journal peer reviewers to subsequent review quality.

    Directory of Open Access Journals (Sweden)

    Michael L Callaham

    2007-01-01

    Full Text Available BACKGROUND: Peer review is considered crucial to the selection and publication of quality science, but very little is known about the previous experiences and training that might identify high-quality peer reviewers. The reviewer selection processes of most journals, and thus the qualifications of their reviewers, are ill defined. More objective selection of peer reviewers might improve the journal peer review process and thus the quality of published science. METHODS AND FINDINGS: 306 experienced reviewers (71% of all those associated with a specialty journal completed a survey of past training and experiences postulated to improve peer review skills. Reviewers performed 2,856 reviews of 1,484 separate manuscripts during a four-year study period, all prospectively rated on a standardized quality scale by editors. Multivariable analysis revealed that most variables, including academic rank, formal training in critical appraisal or statistics, or status as principal investigator of a grant, failed to predict performance of higher-quality reviews. The only significant predictors of quality were working in a university-operated hospital versus other teaching environment and relative youth (under ten years of experience after finishing training. Being on an editorial board and doing formal grant (study section review were each predictors for only one of our two comparisons. However, the predictive power of all variables was weak. CONCLUSIONS: Our study confirms that there are no easily identifiable types of formal training or experience that predict reviewer performance. Skill in scientific peer review may be as ill defined and hard to impart as is "common sense." Without a better understanding of those skills, it seems unlikely journals and editors will be successful in systematically improving their selection of reviewers. This inability to predict performance makes it imperative that all but the smallest journals implement routine review ratings

  5. Operational experience in water chemistry of PHWRs

    International Nuclear Information System (INIS)

    Krishna Rao, K.S.

    2000-01-01

    The chemistry related problems encountered in the moderator, primary heat transport systems, chemical control in the steam generators and the experience gained in the decontamination campaigns carried out in the primary heat transport systems of Indian PHWRs are highlighted in this paper. (author)

  6. Operational experience with the CERN hadron linacs

    International Nuclear Information System (INIS)

    Charmot, H.; Dutriat, C.; Hill, C.E.; Langbein, K.; Lombardi, A.M.; O'Neil, M.; Tanke, E.; Vretenar, M.

    1996-01-01

    The present CERN proton linac (Linac2) was commissioned in 1978 and since that date has been the primary source of protons to the CERN accelerator complex. During the past 18 years, the machine has had a very good reliability record in spite of the demands made upon it. Modifications have been made with the view of maintaining this reliability with reduced resources and new requirements from the users. Further demands will be made in the future for LHC operation. In 1994, a new linac for heavy ion production was put into service replacing the original CERN proton linac. As this machine was built within an international collaboration, operation had to take into account the novelty of the techniques used and the variety of equipment supplied by outside collaborators. Even so, the new machine has also had very good reliability. (author)

  7. Operating experience from Swedish nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-06-01

    During 1997 the PWRs in Ringhals performed extremely well (capability factors 85-90%), the unit Ringhals 2 reached the best capability factor since commercial operation started in 1976. The BWRs made an average 76% capability, which is somewhat less than in 1996. The slightly reduced capability derives from ongoing modernization projects at several units. At the youngest plants, Forsmark 3 and Oskarshamn 3, capability and utilization were very high. Events and data for 1997 are given for each reactor, together with operational statistics for the years 1990-1997. A number of safety-related events are reported, which occurred st the Swedish plants during 1997. These events are classified as level 1 or higher on the international nuclear event scale (INES).

  8. Three years operational experience with biodiesel

    International Nuclear Information System (INIS)

    Murphy, J.

    2008-01-01

    TSI Terminal Systems Inc. is the largest container terminal operator in Canada, and has an annual payroll exceeding $150 million. The company started a biodiesel test program with the Canadian Bioenergy Corporation in order to assess the emission reduction impacts of using biodiesel. The pilot was tested with 6 different pieces of equipment used at the terminal over an initial period of 3 weeks. Emissions testing was then conducted for different biodiesel blend levels and compared with baseline data in relation to particulate matter, total hydrocarbons, carbon monoxide (CO), carbon dioxide (CO 2 ), and nitrous oxides (NO x ). Results of the tests confirmed that the biodiesel blends significantly reduced emissions at the terminal and confirmed the operability of biodiesel. Overall emissions were reduced by 30 per cent. The fuel is now being used in all the company's equipment. The use of the biodiesel has not resulted in any engine failures or power losses. tabs., figs

  9. Operating experience from Swedish nuclear power plants

    International Nuclear Information System (INIS)

    1998-01-01

    During 1997 the PWRs in Ringhals performed extremely well (capability factors 85-90%), the unit Ringhals 2 reached the best capability factor since commercial operation started in 1976. The BWRs made an average 76% capability, which is somewhat less than in 1996. The slightly reduced capability derives from ongoing modernization projects at several units. At the youngest plants, Forsmark 3 and Oskarshamn 3, capability and utilization were very high. Events and data for 1997 are given for each reactor, together with operational statistics for the years 1990-1997. A number of safety-related events are reported, which occurred st the Swedish plants during 1997. These events are classified as level 1 or higher on the international nuclear event scale (INES)

  10. FFTF operating experience, 1982-1984

    International Nuclear Information System (INIS)

    Waldo, J.B.; Franz, G.R.; Loika, E.F.; Krupar, J.J.

    1984-01-01

    The Fast Flux Test Facility (FFTF) is a 400 Mwt sodium-cooled fast reactor operating at the Hanford Engineering Development Laboratory, Richland, Washington, to conduct fuels and materials testing in support of the US Liquid Metal Fast Breeder Reactor (LMFBR) program. Startup and initial power testing included a comprehensive series of nonnuclear and nuclear tests to verify the thermal, hydraulic, and neutronic characteristics of the plant. A specially designed series of natural circulation tests were then performed to demonstrate the inherent safety features of the plant. Early in 1982, the FFTF began its first 100-day irradiation cycle. Since that time the plant has operated very well, achieving a cycle capacity factor of 94% in the most recent irradiation cycle. Seventy-five specific test assemblies and 25,000 individual fuel pins have been irradiated, some in excess of 80 MWd/Kg

  11. Operational experience with the Fermilab Linac

    International Nuclear Information System (INIS)

    Allen, L.J.; Lennox, A.J.; Schmidt, C.W.

    1992-01-01

    The Fermilab 200-MeV Linac has been in operation for nearly 22 years as a proton injector to the Booster synchrotron. It presently accelerates H - ions to 200 MeV for charge-exchange injection into the Booster and to 66 MeV for the production of neutrons at the Neutron Therapy Facility (NTF). The beam intensity is typically 35 mA with pulse widths of 30 μsec for the Booster for high energy physics and 57 μsec for NTF at a maximum of 15 pulses per sec. During a typical physics run of nine to twelve months, beam is available for greater than 98% of the scheduled time. The Linac history, operation, tuning, stability and reliability will be discussed. (Author) 15 refs., 2 tabs

  12. Operational experience with propulsion nuclear plants

    International Nuclear Information System (INIS)

    Polunichev, V.

    2000-01-01

    Russia possesses a powerful icebreaker transport fleet which offers a solution for important socio-economic tasks of the country's northern regions by maintaining a year-round navigation along the Arctic Sea route. The total operating record of the propulsion nuclear reactors till now exceeds 150 reactor-years, their main equipment items operating life amounted to 120,000 h. Progressive design-constructional solutions being perfected continuously during 40 years of nuclear-powered ships creation in Russia and well proven technology of all components used in the marine nuclear reactors give grounds to recommend marine Nuclear Steam Supply Systems (NSSSs) of KLT-40 type as energy sources for heat and power cogeneration plants and sea water desalination complexes, particularly as floating installations. Co-generation stations are considered for deployment in the extreme north of Russia. Nuclear floating desalination complexes can be used for drinkable water production in coastal regions of Northern Africa, the Near East, India etc. (author)

  13. Weapons Experiments Division Explosives Operations Overview

    Energy Technology Data Exchange (ETDEWEB)

    Laintz, Kenneth E. [Los Alamos National Laboratory

    2012-06-19

    Presentation covers WX Division programmatic operations with a focus on JOWOG-9 interests. A brief look at DARHT is followed by a high level overview of explosives research activities currently being conducted within in the experimental groups of WX-Division. Presentation covers more emphasis of activities and facilities at TA-9 as these efforts have been more traditionally aligned with ongoing collaborative explosive exchanges covered under JOWOG-9.

  14. Operational experience at Fort St. Vrain

    International Nuclear Information System (INIS)

    Bramblett, G.C.; Fisher, C.R.; Swart, F.E.

    1981-01-01

    The Fort St. Vrain (FSV) station, a 330-MW(e) single reheat steam cycle powered by a high-temperature gas-cooled reactor (HTGR), is the first HTGR to enter commercial operation. Designed and built by General Atomic Company (GA), the plant is owned and operated by Public Service Company of Colorado (PSC). Many unique design features have been incorporated into this reactor system, including high-pressure helium as the primary system coolant, a graphite-moderated prismatic block core design, fission-product-containing carbide coatings on both fissile and fertile fuel particles, steam-driven helium circulators turning on water bearings, and once-through steam generators. All of these systems are contained in a prestressed concrete reactor vessel (PCRV). Extensive testing has been conducted during the rise to power following first criticality early in 1974 to verify system design performance. During this period, the plant has operated at power levels up to 70% and produced over one billion kilowatt hours of electricity. In 1979, the first refueling was conducted in conjunction with an extensive in-core inspection, the addition of in-core instrumentation, and a planned removal of a circulator for inspection. Later in the year, a scheduled shutdown was undertaken for surveillance tests, insertion of core region constraint devices (RCDs), and other maintenance. Fort St. Vrain has encountered problems of the type that would be expected in a first-of-a-kind system. The plant is currently restricted to 70% of design power by the Nuclear Regulatory Commission (NRC) pending resolution of the core region gas outlet temperature fluctuation problem. Even so, the basic performance of the HTGR concept and all of the unique design features have been successfully demonstrated. The system has been characterized by low personnel radiation exposures, operational flexibility, and long time afforded for status evaluation and response. (author)

  15. Fort St. Vrain circulator operating experience

    Energy Technology Data Exchange (ETDEWEB)

    Brey, H. L.

    1988-08-15

    Fort St. Vrain, on the system of Public Service Company of Colorado, is the only high-temperature gas-cooled power reactor in the United States. Four helium circulators are utilized in this plant to transfer heat from the reactor to the steam generators. These unique machines have a single stage axial flow helium compressor driven by a single stage steam turbine. A single stage water driven (pelton wheel) turbine is the back-up drive utilizing either feed water, condensate, or fire water as the driving fluid. Developmental testing of the circulators was accomplished prior to installation into Fort St. Vrain. A combined machine operating history of approximately 250,000 hours has shown these machines to be of conservative design and proven mechanical integrity. However, many problems have been encountered in operating the complex auxiliaries which are necessary for successful circulator and plant operation. It has been 15 years since initial installation of the circulators occurred at Fort St. Vrain. During this time, a number of significant issues had to be resolved dealing specifically with machine performance. These events include cavitation damage of the pelton wheels during the initial plant hot functional testing, cracks in the water turbine buckets and cervic coupling, static shutdown seal bellows failure, and, most recently, degradation of components within the steam drive assembly. Unreliable operation particularly with the circulator auxiliaries has been a focus of attention by Public Service Company of Colorado. Actions to replace or significantly modify the existing circulators and their auxiliaries are currently awaiting decisions concerning the long-term future of the Fort St. Vrain plant. (author). 10 refs, 7 figs, 2 tabs.

  16. Fort St. Vrain circulator operating experience

    International Nuclear Information System (INIS)

    Brey, H.L.

    1988-01-01

    Fort St. Vrain, on the system of Public Service Company of Colorado, is the only high-temperature gas-cooled power reactor in the United States. Four helium circulators are utilized in this plant to transfer heat from the reactor to the steam generators. These unique machines have a single stage axial flow helium compressor driven by a single stage steam turbine. A single stage water driven (pelton wheel) turbine is the back-up drive utilizing either feed water, condensate, or fire water as the driving fluid. Developmental testing of the circulators was accomplished prior to installation into Fort St. Vrain. A combined machine operating history of approximately 250,000 hours has shown these machines to be of conservative design and proven mechanical integrity. However, many problems have been encountered in operating the complex auxiliaries which are necessary for successful circulator and plant operation. It has been 15 years since initial installation of the circulators occurred at Fort St. Vrain. During this time, a number of significant issues had to be resolved dealing specifically with machine performance. These events include cavitation damage of the pelton wheels during the initial plant hot functional testing, cracks in the water turbine buckets and cervic coupling, static shutdown seal bellows failure, and, most recently, degradation of components within the steam drive assembly. Unreliable operation particularly with the circulator auxiliaries has been a focus of attention by Public Service Company of Colorado. Actions to replace or significantly modify the existing circulators and their auxiliaries are currently awaiting decisions concerning the long-term future of the Fort St. Vrain plant. (author). 10 refs, 7 figs, 2 tabs

  17. Operational experience with the CEBAF control system

    International Nuclear Information System (INIS)

    Hovater, C.; Chowdhary, M.; Karn, J.; Tiefenback, M.; Zeijts, J. van; Watson, W.

    1996-01-01

    The CEBAF accelerator at Thomas Jefferson National Accelerator Facility (Jefferson Lab) successfully began its experimental nuclear physics program in November of 1995 and has since surpassed predicted machine availability. Part of this success can be attributed to using the EPICS (Experimental Physics and Industrial Control System) control system toolkit. The CEBAF control system is one of the largest accelerator control system now operating. It controls approximately 338 SRF cavities, 2,300 magnets, 500 beam position monitors and other accelerator devices, such as gun hardware and other beam monitoring devices. All told, the system must be able to access over 125,000 database records. The system has been well received by both operators and the hardware designers. The EPICS utilities have made the task of troubleshooting systems easier. The graphical and test-based creation tools have allowed operators to custom build control screens. In addition, the ability to integrate EPICS with other software packages, such as Tcl/Tk, has allowed physicists to quickly prototype high-level application programs, and to provide GUI front ends for command line driven tools. Specific examples of the control system applications are presented in the areas of energy and orbit control, cavity tuning and accelerator tune up diagnostics

  18. Operational experience at Fort St. Vrain

    Energy Technology Data Exchange (ETDEWEB)

    Bramblett, G. C.; Fisher, C. R.; Swart, F. E. [General Atomic Co., San Diego, CA (USA)

    1981-01-15

    The Fort St. Vrain (FSV) station, a 330-MW(e) single reheat steam cycle powered by a high-temperature gas-cooled reactor (HTGR), is the first HTGR to enter commercial operation. Designed and built by General Atomic Company (GA), the plant is owned and operated by Public Service Company of Colorado (PSC). Many unique design features have been incorporated into this reactor system, including high-pressure helium as the primary system coolant, a graphite-moderated prismatic block core design, fission-product-containing carbide coatings on both fissile and fertile fuel particles, steam-driven helium circulators turning on water bearings, and once-through steam generators. All of these systems are contained in a prestressed concrete reactor vessel (PCRV). Extensive testing has been conducted during the rise to power following first criticality early in 1974 to verify system design performance. During this period, the plant has operated at power levels up to 70% and produced over one billion kilowatt hours of electricity. In 1979, the first refueling was conducted in conjunction with an extensive in-core inspection, the addition of in-core instrumentation, and a planned removal of a circulator for inspection.

  19. Metal losses in pyrometallurgical operations - A review.

    Science.gov (United States)

    Bellemans, Inge; De Wilde, Evelien; Moelans, Nele; Verbeken, Kim

    2018-05-01

    Nowadays, a higher demand on a lot of metals exists, but the quantity and purity of the ores decreases. The amount of scrap, on the other hand, increases and thus, recycling becomes more important. Besides recycling, it is also necessary to improve and optimize existing processes in extractive and recycling metallurgy. One of the main difficulties of the overall-plant recovery are metal losses in slags, in both primary and secondary metal production. In general, an increased understanding of the fundamental mechanisms governing these losses could help further improve production efficiencies. This review aims to summarize and evaluate the current scientific knowledge concerning metal losses and pinpoints the knowledge gaps. First, the industrial importance and impact of metal losses in slags will be illustrated by several examples from both ferrous and non-ferrous industries. Throughout the remainder of this review, the main focus will be put on the particular issues in copper industry. In a second section, the different types of metal losses in slags will be discussed. Generally, metal losses in slags can be subdivided into two types: chemical losses and physical losses. The fundamental insights concerning the responsible mechanisms will be discussed for each type. Subsequently, an overview of the most frequently used techniques for research investigations of the losses will be given. In a fourth section, a more detailed overview will be given on the post-processing treatment of metal-containing slags, i.e. performing slag cleaning operations. The most frequently applied methods will be discussed. Copyright © 2017 Elsevier B.V. All rights reserved.

  20. Operational Readiness Review: Savannah River Replacement Tritium Facility

    International Nuclear Information System (INIS)

    1993-02-01

    The Operational Readiness Review (ORR) is one of several activities to be completed prior to introducing tritium into the Replacement Tritium Facility (RTF) at the Savannah River Site (SRS). The Secretary of Energy will rely in part on the results of this ORR in deciding whether the startup criteria for RTF have been met. The RTF is a new underground facility built to safely service the remaining nuclear weapons stockpile. At RTF, tritium will be unloaded from old components, purified and enriched, and loaded into new or reclaimed reservoirs. The RTF will replace an aging facility at SRS that has processed tritium for more than 35 years. RTF has completed construction and is undergoing facility startup testing. The final stages of this testing will require the introduction of limited amounts of tritium. The US Department of Energy (DOE) ORR was conducted January 19 to February 4, 1993, in accordance with an ORR review plan which was developed considering previous readiness reviews. The plan also considered the Defense Nuclear Facilities Safety Board (DNFSB) Recommendations 90-4 and 92-6, and the judgements of experienced senior experts. The review covered three major areas: (1) Plant and Equipment Readiness, (2) Personnel Readiness, and (3) Management Systems. The ORR Team was comprised of approximately 30 members consisting of a Team Leader, Senior Safety Experts, and Technical Experts. The ORR objectives and criteria were based on DOE Orders, industry standards, Institute of Nuclear Power Operations guidelines, recommendations of external oversight groups, and experience of the team members

  1. International Experience with Fast Reactor Operation & Testing

    International Nuclear Information System (INIS)

    Sackett, John I.; Grandy, C.

    2013-01-01

    Conclusion: • Worldwide experience with fast reactors has demonstrated the robustness of the technology and it stands ready for worldwide deployment. • The lessons learned are many and there is danger that what has been learned will be forgotten given that there is little activity in fast reactor development at the present time. • For this reason it is essential that knowledge of fast reactor technology be preserved, an activity supported in the U.S. as well as other countries

  2. Operational experiences of INES in Japan

    International Nuclear Information System (INIS)

    1997-01-01

    Japan has introduced IAEA's INES in August, 1992. As of September, 1997, the total number of domestic nuclear events which have evaluated by using the INES system has amounted 119. In Japan, when a nuclear event occurs at a nuclear power plant, a provisional evaluation is performed immediately by Nuclear Power Operation Administration Office, MITI. The final evaluation of events is implemented a few months after event occurrence by the Evaluation Committee on Incidents and Failures of Nuclear Power Plant which holds a neutral position. The results of the evaluation are transmitted to IAEA according to the INES reporting criteria

  3. Operating experiences at the Finnish TRIGA reactor

    International Nuclear Information System (INIS)

    Salmenhaara, Seppo

    1988-01-01

    The Finnish TRIGA reactor has been in operation since March 1962. There are still 57 original Al-clad fuel elements in the core. So far we have had only two fuel cladding failures in 1981 and 1988. The first one was an Al-clad element and the second one a SS-clad. The low rate of fuel cladding failures has made it possible to use continuously also the Al-clad fuel elements. Although some conventional irradiations of certain type have been repeated successfully tens of times, new and unexpected incidents can still take place. As an example an event of a leaking irradiation capsule is described

  4. Operating experience with the ALS linac

    International Nuclear Information System (INIS)

    Selph, F.; Massoletti, D.

    1991-05-01

    The linac injector for the Advanced Light Source (ALS) at LBL was recently put into operation. Energy is 50 MeV, frequency 3 GHz. The electron gun delivers up to 6nC in a 3.0-ns bunch at 120 kV. A train of bunches is injected into a 1-Hz booster and accelerated to 1.5 GHz for storage ring injection. A magnetic analysis system is used for optimizing the linac. Measured beam properties from the gun and after acceleration in the linac are described. 9 refs., 3 figs

  5. Operating experience with 600 MW steam turbosets

    International Nuclear Information System (INIS)

    Tinapp, J.

    1978-01-01

    The turbosets of the 600 MW line are machines with 4 casing, with a single-flow high-pressure turbine, a double-flow MD part, and two double-flow low-pressure turbines. The common design of all BBC turbosets of this size is explained, with a few remarks on the typical constructional features of BBC technology. The plant has a mean availability of 96% and a mean forced shutdown rate of 1.2%. A table gives a survey of the start-up procedure and the operating results so far. (GL) [de

  6. Evaluation of operating experience with safety values

    International Nuclear Information System (INIS)

    Bung, W.; Hoemke, P.; Oberender, W.; Paul, H.; Rueter, W.

    1985-01-01

    This report describes statistical investigations of 2076 functional tests carried out on power operated safety valves in conventional power plants in 1972 until 1983 with special regard to Common Mode-Failures. The results clearly show that Common Mode-Failures play an important part of non-availability for the controlled safety valves, especially in the control system. The 'Deutsche Risikostudie' does not consider any Common Mode-Failures of the primary safety valves. However there is no significant increase of the risk resulted by the primary safety valves in the 'Referenzanlage' if the calculated Common Mode-Failures probabilities are considered. (orig.) [de

  7. SALTO Peer Review Guidelines. Guidelines for Peer Review of Safety Aspects of Long Term Operation of Nuclear Power Plants

    International Nuclear Information System (INIS)

    2014-01-01

    International peer review is a useful tool for Member States to exchange experiences, learn from each other and apply good practices in the long term operation (LTO) of nuclear power plants (NPPs). The peer review is also an important mechanism through which the IAEA supports Member States in enhancing the safety of NPPs. The IAEA has conducted various types of safety review that indirectly address aspects of LTO, including safety reviews for design, engineering, operation and external hazards. Operational Safety Review Team (OSART) services include review of ageing management programmes. In addition, several Member States have requested Ageing Management Assessment Team (AMAT) missions. Through these experiences, it was recognized that a comprehensive peer review on LTO would be very useful to Member States. The Safety Aspects of Long Term Operation (SALTO) peer review addresses strategy and key elements for the safe LTO of NPPs, which includes AMAT objectives and complements OSART reviews. The SALTO peer review is designed to assist operating organizations in adopting a proper approach to LTP including implementing appropriate activities to ensure that plant safety will be maintained during the LTO period. The SALTO peer review can be tailored to focus on ageing management programmes (AMPs) or on other activities related to LTO to support the Member State in enhancing the safety of its NPPs. The SALTO peer review can also support regulators in establishing or improving regulatory and licensing strategies for the LTO of NPPs. The guidelines in this publication are primarily intended for members of a SALTO review team and provide a basic structure and common reference for peer reviews of LTO. Additionally, the guidelines also provide useful information to the operating organizations of NPPs (or technical support organizations) for carrying out their own self-assessments or comprehensive programme reviews. The guidelines are intended to be generic, as there are

  8. MOX use in PWRs. EDF operation experience

    International Nuclear Information System (INIS)

    Provost, Jean-Luc; Debes, Michel

    2011-01-01

    From the origin, EDF back-end fuel cycle strategy has focused on 'closing the fuel cycle', in other words integrating fuel reprocessing, with vitrification of high level waste concentrated within small volumes, and the recycling of valuable materials. The implementation of this policy was marked in 1987 by the first loading of sixteen MOX. By December 2010, 20 reactors have been loaded with 1750 tHM of MOX. EDF current strategy is to match the reprocessing program with MOX manufacturing capacity to limit the quantity of separated plutonium. This is routinely called the 'flow ad-equation' strategy. Currently, the MOX Parity core management achieves balance of MOX and UOX performance with a significant increase of the MOX discharge burn-up. Globally, the behavior under irradiation of MOX fuel assemblies has been satisfactory. So far, from the beginning of MOX use in EDF PWRs, only 6 MOX FAs with rod leakage have been identified, which gives a very satisfactory level of reliability. The industrial maturity of MOX fuel, with increased performances, allows the improvement of nuclear KWh competitiveness and of the plant operation performance, while maintaining in operation the same safety level, without significant impact on environment and radiological protection. (author)

  9. Operational experience acquired in radioactive waste compaction

    International Nuclear Information System (INIS)

    Bauer, S.; Mohr, P.; Hempelmann, W.

    1993-01-01

    The low-level radioactive waste scrapping facility in the KfK decontamination division was commissioned in 1983. Non-combustible residues and removed system components of low activity, but which are to be handled and disposed of as radioactive waste are in drums, casks or containers delivered to the facility. The waste usually undergoes pretreatment in a crusher, with the volume being definitively reduced at a pressure of 690 bar in the high-pressure compactor. In 1990, the overhead-crane was refurbished for remote control handling in the scrapping caisson. The parts to undergo scrapping are unpacked in the material lock, and then go into the scrapping caisson. It is possible to use here various mechanical and thermal methods to dismantle the respective parts. But most of the parts to undergo scrapping are such as that it is possible to directly pretreat them in the crusher. The obtained scrap is loaded into 180-liter drums. Most of the machinery in the caisson is manually operated. The operating crew enters the caisson in fully ventilated protective overalls. The drums filled with the scrap then go to the high-pressure compactor in the caisson. The compacts are temporarily stored, until recalled depending on their height and filled into drums such as that optimal drum filling is guaranteed

  10. BN-600 power unit 15-year operating experience

    International Nuclear Information System (INIS)

    Saraev, O.M.; Oshkanov, N.N.; Vylomov, V.V.

    1996-01-01

    Comprehensive experience has been gained with the operating fast reactor BN-600 with a power out of 600 MWe. This paper includes important performance results and gives also an overview of the experience gained from BN-600 NPP commercial operation during 15 years. (author). 2 figs, 1 tab

  11. Operability design review of prototype large breeder reactor (PLBR) designs. Final report, September 1981

    International Nuclear Information System (INIS)

    Beakes, J.H.; Ehman, J.R.; Jones, H.M.; Kinne, B.V.T.; Price, C.M.; Shores, S.P.; Welch, J.K.

    1981-09-01

    Prototype Large Breeder Reactor (PLBR) designs were reviewed by personnel with extensive power plant operations experience. Fourteen normal and off-normal events, such as startup, shutdown, refueling, reactor scram and loss of feedwater, were evaluated using an operational evaluation methodology which is designed to facilitate talk-through sessions on operational events. Human factors engineers participated in the review and assisted in developing and refining the review methodologies. Operating experience at breeder reactor facilities such as Experimental Breeder Reactor-II (EBR-II), Enrico Fermi Atomic Power Plant - Unit 1, and the Fast Flux Test Facility (FFTF) was gathered, analyzed, and used to determine whether lessons learned from operational experience had been incorporated into the PLBR designs. This eighteen month effort resulted in approximately one hundred specific recommendations for improving the operability of PLBR designs

  12. Physics experiments with the operating reactor

    Energy Technology Data Exchange (ETDEWEB)

    Cullington, G R; King, D C

    1973-09-27

    Experimental techniques have been developed and used on Dragon to give consistent information on excess reactivity and shut down margin. The reactivity measurements have been correlated with the theoretical calculations and have led to improvements in the calculations. The methods used and the results obtained are accepted by the Safety Committee as sufficient evidence for compliance with the fuel loading safety rules. Although the reactor was not designed as an experimental facility, flux and dose measurements experiments have been successfully carried out. Mass flow and negative reactivity transient measurements have been carried out. These are valuable for demonstration of the flexibility of the reactor system and for giving confidence in theoretical calculations.

  13. RAS III - concept and operating experience

    International Nuclear Information System (INIS)

    Kunze, U.; Wander, J.

    1990-01-01

    A new noise analysis system RAS III is being employed at the Greifswald NPP 'Bruno Leuschner' units 5 and 6 which differs from its forerunner types by an extended number of measuring points and a higher degree of automation. Substantial prerequisite of the system's full efficiency is implementation of efficient signal monitoring techniques that free the power plant engineer from routine work as well. The system has therefore been completed by algorithms established for automatic noise signal spectra control and for monitoring the pressure vessel vibrations. Moreover, a number of special techniques have been developed, such as for recording velocity-time plots during control element drop experiments. (author)

  14. Operational readiness review phase-1 final report for WRAP-1

    Energy Technology Data Exchange (ETDEWEB)

    Bowen, W., Westinghouse Hanford

    1996-12-27

    This report documents the Operational Readiness Review for WRAP-1 Phase-1 operations. The report includes all criteria, lines of inquiry with resulting Findings and Observations. The review included assessing operational capability of the organization and the computer controlled process and facility systems.

  15. Usability and User Experience Information in Reviews

    DEFF Research Database (Denmark)

    Hedegaard, Steffen

    future versions of the prod- uct? The results show that users write about product use in terms related to standard and popularly researched aspects of usability and user experience, e.g. effiiency, effectiveness, enjoyment, frustration. The frequency with which different aspects are depicted in reviews...... differs significantly between product domains. We also find that reviews contain descriptions of more persistent usability issues. I devise automatic methods for classifying sentences with regard to dimensions of both usability and user experience and usability problems and perform a linguistic analysis...

  16. Operating experience in nuclear power plants

    International Nuclear Information System (INIS)

    Anon.

    1984-01-01

    The nuclear power plants in the Federal Republic of Germany kept their portion of power supply into the public grid system constant in 1983, compared to 1982. The generation had an absolute increase of 3.6% and amounts now to 65.9 TWh. Particularly mentioned should be the generation of the Grafenrheinfeld Nuclear Power Plant which is holding the 'World Record' with 9.969 TWh. The availability of the plants was generally satisfactory, as far as long-term retrofit measures with long outage periods were not necessary, as it was the case in Brunsbuettel and Wuergassen. The planned retrofit phases have been completed in all power plants. As far as safety is concerned, there was no reason to recommended a change of the present fundamental planning- and operation aspects. (orig.) [de

  17. Operational experience of gamma radiation processing facility

    International Nuclear Information System (INIS)

    Patel, Nilesh

    2014-01-01

    Universal lSO-MED is now proud to announce an extension of its irradiation service for low-dose applications specifically in agriculture commodities, food and healthcare applications with the start of Gujarat Agro Radiation Processing Facility at Village: Bavla, Ahmedabad (A Government Enterprise) Operated, Maintained and Managed by Universal Medicap Ltd. Availability of hygienic, safe and nutritious food commodities is essential for any sustainable human development. Food stability is an important element of economic stability and self-reliance of a nation. Though the need to preserve food has been felt by the mankind since the time immemorial, it is even stronger in today's context. The rising population and increasing gap between demand and supply, agro-climatic conditions, in adequate post-harvest practices, seasonal nature of produce and long distances between production and consumption centers underscore the need to device improved conservation and preservation strategies

  18. Incorporating operational experience and design changes in availability forecasts

    International Nuclear Information System (INIS)

    Norman, D.

    1988-01-01

    Reliability or availability forecasts which are based solely on past operating experience will be precise if the sample is large enough, and unbiased if nothing in the future design, environment, operating region or anything else changes. Unfortunately, life is never like that. This paper considers the methodology and philosophy of modifying forecasts based on past experience to take account also of changes in design, construction methods, operating philosophy, environments, operator training and so on, between the plants which provided the operating experience and the plant for which the forecast is being made. This emphasises the importance of collecting, assessing, and learning from past data and of a thorough knowledge of future designs, and procurement, operation, and maintenance policies. The difference between targets and central estimates is also discussed. The paper concludes that improvements in future availability can be made by learning from past experience, but that certain conditions must be fulfilled in order to do so. (author)

  19. Operating experience from Swedish nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-06-01

    The total production of electricity from Swedish nuclear power plants was 70.5 TWh during 1998, which is the second highest yearly production ever. Production losses due to low demand totaled 5.1 TWh combined for all twelve units and production losses due to coastdown operation totaled an additional 0.5 TWh. The reason for this low power demand was a very good supply of water to the hydropower system. Hydroelectric power production was 73.6 TWh, an increase by roughly 5 TWh since 1997. Hence, the hydroelectric power production substantially exceeded the 64 TWh expected during a normal year, i.e. a year with average rainfall. Remaining production sources, mainly fossil fuel electricity production combined with district heating, contributed with 10 TWh. The total electricity production was 154.2 TWh, the highest yearly production ever. The total electricity consumption including transmission losses was 143.5 TWh. This is also the highest consumption ever and an increase by one percent compared to 1997. The preliminary net result of the electric power trade shows a net export by 10.7 TWh. The figures above are calculated from the preliminary production results. A comprehensive report on electric power supply and consumption in Sweden is given in the 1998 Annual Report from the Swedish Power Association. Besides Oskarshamn 1, all plants have periodically been operated in load-following mode, mostly because of the abundant supply of hydropower. The energy availability for the three boiling water reactors at Forsmark averaged 93.3 % and for the three pressure water reactors at Ringhals 91.0 %, both figures are the highest ever noted. In the section `Special Reports` three events of importance to safety that occurred during 1998 are reported. The events were all rated as level 1 according to the International Nuclear Event Scale (INES) Figs, tabs.; Also available in Swedish

  20. Operating experience from Swedish nuclear power plants

    International Nuclear Information System (INIS)

    1999-01-01

    The total production of electricity from Swedish nuclear power plants was 70.5 TWh during 1998, which is the second highest yearly production ever. Production losses due to low demand totaled 5.1 TWh combined for all twelve units and production losses due to coastdown operation totaled an additional 0.5 TWh. The reason for this low power demand was a very good supply of water to the hydropower system. Hydroelectric power production was 73.6 TWh, an increase by roughly 5 TWh since 1997. Hence, the hydroelectric power production substantially exceeded the 64 TWh expected during a normal year, i.e. a year with average rainfall. Remaining production sources, mainly fossil fuel electricity production combined with district heating, contributed with 10 TWh. The total electricity production was 154.2 TWh, the highest yearly production ever. The total electricity consumption including transmission losses was 143.5 TWh. This is also the highest consumption ever and an increase by one percent compared to 1997. The preliminary net result of the electric power trade shows a net export by 10.7 TWh. The figures above are calculated from the preliminary production results. A comprehensive report on electric power supply and consumption in Sweden is given in the 1998 Annual Report from the Swedish Power Association. Besides Oskarshamn 1, all plants have periodically been operated in load-following mode, mostly because of the abundant supply of hydropower. The energy availability for the three boiling water reactors at Forsmark averaged 93.3 % and for the three pressure water reactors at Ringhals 91.0 %, both figures are the highest ever noted. In the section 'Special Reports' three events of importance to safety that occurred during 1998 are reported. The events were all rated as level 1 according to the International Nuclear Event Scale (INES)

  1. Experience in startup and operation of fast flux facility

    International Nuclear Information System (INIS)

    Moffitt, W.C.

    1980-01-01

    The testing program was structured to perform all testing under formal testing procedures with a test engineer as the test director and the plant operators operating the systems and equipment. This provided excellent training and experience for the operators in preparation for eventual reactor operation. Operations preparations for the testing and operation activities has consisted of academic training, formal on-the-job training including systems operation and examinations by persons with an expert knowledge on that portion of the plant, training at EBR-II and the High Temperature Sodium Facility for selected senior operators, operating procedure preparation, training on an FFTF Control Room operator training simulator, and formal written, oral and operating examinations

  2. Proceedings of 2nd PHWR operating safety experience meeting

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1991-04-01

    Papers presented during the eight sessions of the meeting were devoted to the impact of PHWR operating experience on design of civil structures (reactor building integrity); operating experiences related to pressure tubes, nuclear steam supply system, plant stability; reactor maintenance and control systems, reactor operational safety. Some events concerned with reactor shutdown due to power failures are described, as well as action undertaken to prevent major damage.

  3. Large remote manipulator operating and maintenance experience at IEM cell

    International Nuclear Information System (INIS)

    Hicks, D.F.; McGuinness, P.W.

    1985-01-01

    The Interim Examination and Maintenance (IEM) Cell at the Fast Flux Test Facility (FFTF) has two large Electro-Mechanical Manipulators (EMM's). These manipulators are used for cell operations (processing of reactor core components) as well as general cell maintenance. From our eleven years of operation and maintenance experience with these large EMM's, we have learned many lessons concerning manipulator design. This paper describes the IEM Cell EMM design features and discusses operating and maintenance experience at the IEM Cell

  4. Proceedings of 2nd PHWR operating safety experience meeting

    International Nuclear Information System (INIS)

    1991-04-01

    Papers presented during the eight sessions of the meeting were devoted to the impact of PHWR operating experience on design of civil structures (reactor building integrity); operating experiences related to pressure tubes, nuclear steam supply system, plant stability; reactor maintenance and control systems, reactor operational safety. Some events concerned with reactor shutdown due to power failures are described, as well as action undertaken to prevent major damage

  5. ETSON proposal on the European operational experience feedback system

    International Nuclear Information System (INIS)

    Maqua, Michael; Bertrand, Remy; Gelder, Pieter de

    2007-01-01

    The new IAEA Safety Fundamentals states regarding the operating experience feedback: The feedback of operating experience from facilities and activities - and, where relevant, from elsewhere - is a key means of enhancing safety. Processes must be put in place for the feedback and analysis of operating experience, including initiating events, accident precursors, near misses, accidents and unauthorized acts, so that lessons may be learned, shared and acted upon. This presentation deals with the proposal of the ETSON (European TSO Network) to optimize the European operating experiences feedback (OEF). It is generally recognized that the efficiency of nuclear safety supervision by public authorities is based on two key requirements: - the existence of a competent authority at national level, benefiting from an appropriate legislative and regulatory basis, from adequate (quantitatively and qualitatively) human resources, particularly for inspection purposes, - the availability of resources devoted to highly specialised independent technical expertise, in order to provide competent authorities with pertinent technical opinions on: -- the safety files provided by operators, for the purpose of licensing corresponding activities, -- the exploitation for regulatory purposes of the operating experience feed back from licensed nuclear installations. There are two worldwide systems intended to learn lessons from experience: the WANO (World Association of Nuclear Operators) system established by the licensees with access restricted to operating organizations and the IRS system jointly operated by IAEA and OECD/NEA accessible to regulators and to some other users nominated by the regulators in their countries. The IRS itself is dedicated to the analysis of safety significant operating events. NEA/CNRA runs a permanent working group on operating experience (WGOE). WGOE provides among other things also generic reports on safety concerns related to operating experiences and

  6. Best Practices in the Management of an Operating Experience Programme at Nuclear Power Plants

    International Nuclear Information System (INIS)

    2010-08-01

    The IAEA Fundamental Safety Principles (IAEA Safety Standards Series No. SF-1) state the need for operating organizations to establish a programme for the feedback and analysis of operating experience in nuclear power plants. Such a programme ensures that operating experience is analysed, events important to safety are reviewed in depth, lessons learned are disseminated to the staff of the organization and to the relevant national and international organizations and corrective actions are effectively implemented. In IAEA Operational Safety Review Team (OSART) and Peer Review of the effectiveness of the Operational Safety Performance Experience Review (PROSPER) missions, weaknesses in the management of operating experience (OE) programmes have been identified as one of the root causes of the recurrence of events. This publication has been developed to provide advice and assistance to nuclear installation managers and related institutions, including contractors and support organizations, to strengthen and enhance the management of their OE processes. In this publication, a number of barriers to the successful management of an OE programme have been identified. Managers are encouraged to review and evaluate these barriers with a view to identifying and eliminating them within their own organizations

  7. Review of irradiation experiments for water reactor safety research

    International Nuclear Information System (INIS)

    Tobioka, Toshiaki

    1977-02-01

    A review is made of irradiation experiments for water reactor safety research under way in both commercial power plants and test reactors. Such experiments are grouped in two; first, LWR fuel performance under normal and abnormal operating conditions, and second, irradiation effects on fracture toughness in LWR vessels. In the former are fuel densification, swelling, and the influence of power ramp and cycling on fuel rod, and also fuel rod behavior under accident conditions in in-reactor experiment. In the latter are the effects of neutron exposure level on the ferritic steel of pressure vessels, etc.. (auth.)

  8. Integrating Renewable Generation into Grid Operations: Four International Experiences

    Energy Technology Data Exchange (ETDEWEB)

    Weimar, Mark R. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Mylrea, Michael E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Levin, Todd [Argonne National Lab. (ANL), Argonne, IL (United States); Botterud, Audun [Argonne National Lab. (ANL), Argonne, IL (United States); O' Shaughnessy, Eric [National Renewable Energy Lab. (NREL), Golden, CO (United States); Bird, Lori [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-04-22

    International experiences with power sector restructuring and the resultant impacts on bulk power grid operations and planning may provide insight into policy questions for the evolving United States power grid as resource mixes are changing in response to fuel prices, an aging generation fleet and to meet climate goals. Australia, Germany, Japan and the UK were selected to represent a range in the level and attributes of electricity industry liberalization in order to draw comparisons across a variety of regions in the United States such as California, ERCOT, the Southwest Power Pool and the Southeast Reliability Region. The study draws conclusions through a literature review of the four case study countries with regards to the changing resource mix and the electricity industry sector structure and their impact on grid operations and planning. This paper derives lessons learned and synthesizes implications for the United States based on answers to the above questions and the challenges faced by the four selected countries. Each country was examined to determine the challenges to their bulk power sector based on their changing resource mix, market structure, policies driving the changing resource mix, and policies driving restructuring. Each countries’ approach to solving those changes was examined, as well as how each country’s market structure either exacerbated or mitigated the approaches to solving the challenges to their bulk power grid operations and planning. All countries’ policies encourage renewable energy generation. One significant finding included the low- to zero-marginal cost of intermittent renewables and its potential negative impact on long-term resource adequacy. No dominant solution has emerged although a capacity market was introduced in the UK and is being contemplated in Japan. Germany has proposed the Energy Market 2.0 to encourage flexible generation investment. The grid operator in Australia proposed several approaches to maintaining

  9. Operating Experience of MACSTOR Modules at CANDU 6 Stations

    International Nuclear Information System (INIS)

    Beaudoin, Robert R.

    2005-01-01

    Over the last three decades, Atomic Energy of Canada Limited (AECL) has contributed to the technology development and implementation of dry spent fuel management facilities in Canada, Korea and Romania During that period, AECL has developed a number of concrete canister models and the MACSTOR200 module, a medium size air-cooled vault with a 228 MgU (Mega grams of Uranium) capacity. AECL's dry storage technologies were used for the construction of eight large-scale above ground dry storage facilities for CANDU spent fuel. As of 2005, those facilities have an installed capacity in excess of 5,000 MgU. Since 1995, the two newest dry storage installations built for CANDU 6 reactors at Gentilly 2 (Canada) and Cernavoda (Romania) used the MACSTOR 200 module. Seven such modules have been built at Gentilly 2 during the 1995 to 2004 period and one at Cernavoda in 2003. The construction and operating experience of those modules is reviewed in this paper. The MACSTOR 200 modules were initially designed for a 50-year service life, with recent units at Gentilly 2 licensed for a 100-year service life in a rural (non-maritime) climate. During the 1995-2005 period, six of the eight modules were loaded with fuel. Their operation has brought a significant amount of experience on loading operations, performance of fuel handling equipment, radiation shielding, heat transfer, monitoring of the two confinement boundaries and radiation dose to personnel. Heat dissipation performance of the MACSTOR 200 was initially licensed using values derived from full scale tests made at AECL's Whiteshell Research Laboratories, that were backed-up by temperature measurements made on the first two modules. Results and computer models developed for the MACSTOR 200 module are described. Korea Hydro and Nuclear Power (KHNP) and its subsidiary Nuclear Environment Technology Institute (NETEC), in collaboration with Hyundai Engineering Company Ltd. (HEC) and AECL, are developing a new dry storage module to

  10. Operating experience and construction status of ATLAS

    International Nuclear Information System (INIS)

    Pardo, R.C.; DenHartog, P.; Shepard, K.W.; Zinkann, G.

    1984-01-01

    The present Argonne Tandem-Linac accelerator has operated in a reliable manner during the past year. The accelerator system provided 4402 hours of experimental beam time with a wide variety of heavy-ions. Figure 1 shows the beams which have been provided during the past year. New beams accelerated by the linac include 300 MeV 82 Se and 390 MeV 109 Ag. In tests, the tandem accelerated 102 MeV 127 I. This is the heaviest beam ever accelerated by the Argonne tandem. The long-term performance of the niobium resonators appears to be good. No significant degradation of performance has been observed for most resonators over many years of use with the exceptions of problems caused by catastrophic vacuum accidents. Resonators whose performance has deteriorated after vacuum accidents have recently been restored to their original performance state by a simple technique. The technique used is to rinse the interior of the resonator with a sequence of baths of solvents and water

  11. HDS unit revamp and operating experience

    Energy Technology Data Exchange (ETDEWEB)

    Reinhardt, J. [Veba Oel Verarbeitungs-GmbH, Gelsenkirchen (Germany); Balfanz, U. [Aral Forschung, Gelsenkirchen (Germany); Dimmig, T. [TU Bergakademie Freiberg, Freiberg (Germany)

    2002-12-01

    Ruhr Oel GmbH, a joint venture between BP and PDVSA, operates a HDS unit at its Gelsenkirchen-Scholven site. The unit produces a major blend component for diesel fuel. Driven by ambitious German environmental policy and by an agreement between the German car and oil industries on the one hand and the government on the other, more stringent low sulphur fuel specifications will be enforced in Germany much earlier than in the rest of the European Union. In view of this situation a project was developed to fulfill the new product specifications with minimum investment. In a joint effort involving the refinery, the company research facilities and the catalyst supplier (AKZO NOBEL), pilot plant tests were performed to develop the best catalyst system and the new process conditions. Based on these results, an existing HDS unit was accordingly revamped. After the revamp, the unit produced diesel fuel with 50 ppm sulphur content and furthermore test runs at 10 ppm were carried out successfully. These results are displayed in this article. (orig.)

  12. Operational experience at the Sludge Treatment Facility

    International Nuclear Information System (INIS)

    Sy, D.J.

    1987-01-01

    The Sludge Treatment Facility (STF) at the Oak Ridge Gaseous Diffusion Plant has been in operation since April 1987. The facility was designed to encapsulate hazardous sludge wastes in a cement matrix. Fixation will allow the waste to meet or exceed applicable compressive strength and leachability requirements. Thus, the grout mixture complies with the Resource Conservation and Recovery Act (RCRA) guidelines as a nonhazardous waste. The grout mixture is based upon a recipe formulation developed after several years of waste stream characterization and formulation studies. The wastes to be treated at the STF are wastes impounded in two ponds. The ponds have a combined capacity of 4.5 million gallons of sludge. The sludge is transferred from the ponds to a 15,000-gallon capacity storage tank by the use of a dredge. The grout mixture recipe dictates the amount of sludge, cement, fly ash, and admixture required for weighing per batch. All ingredients are weighed and then transferred to a tilt or high energy mixer for mixing. The grout mixture is then transferred to 89- or 96-gallon steel drums. The drums are placed in a storage yard designed for a point source discharge from the yard

  13. An operating nuclear utility's experience with the ALARA design of a new nuclear unit

    International Nuclear Information System (INIS)

    Rodgers, R.C.

    1985-01-01

    This talk presents a review of how operating experience at Northeast Utilities has been factored into the design of a new nuclear unit and the development and management of the radiation protection program. Their operational experience has indicated that there are two facets to keeping radiation exposures ALARA. The first is the proper ALARA design of the unit. The other facet is the design of a comprehensive radiation protection program. The author discusses these facets in some detail

  14. Review of modern double beta decay experiments

    Science.gov (United States)

    Barabash, A. S.

    2015-10-01

    The review of modern experiments on search and studying of double beta decay processes is done. Results of the most sensitive current experiments are discussed. The main attention is paid to EXO-200, KamLAND-Zen, GERDA-I and CUORE-0 experiments. Modern values of T1/2(2ν) and best present limits on neutrinoless double beta decay and double beta decay with Majoron emission are presented. Conservative limits on effective mass of a Majorana neutrino ( at the level of ˜ 0.01-0.1 eV are discussed.

  15. Operating experience with nuclear power plants 2015. Pt. 1

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    2016-07-01

    The VGB Technical Committee ''Nuclear Plant Operation'' has been exchanging operating experience about nuclear power plants for more than 30 years. Plant operators from several European countries are participating in the exchange. A report is given on the operating results achieved in 2015, events important to plant safety, special and relevant repair, and retrofit measures from Germany. The second part of this report will focus on nuclear power plant in Belgium, Finland, the Netherlands, Switzerland, and Spain.

  16. Remote maintenance of an operational fusion experiment

    Energy Technology Data Exchange (ETDEWEB)

    Kiptily, V.G.; Jarvis, O.N.; Popovichev, S. [Euratom/UKAEA Fusion Assoc., Culham Science Centre, Abingdon, Oxon. (United Kingdom)] [and others

    2001-07-01

    Optimisation of auxiliary plasma heating by means of Ion Cyclotron Radio-Frequency (ICRF) and Neutral Beam Injection (NBI) as envisaged for the future fusion reactors is one of the main priorities in present research at today's tokamaks. Therefore, investigation of the production of fast ions during heating and of the subsequent fast ion behaviour in magnetically confined plasmas, together with an evaluation of the resulting bulk ion heating efficiency, are of essential importance for fusion reactor development. Gamma-ray diagnostics, based on the measurement of the gamma-ray emission from nuclear reactions between fast ions and the main plasma impurities, is a valuable technique for studying the fast particle energy distributions. Gamma-ray spectrometry provides information on the energy distribution, and the measurement of emission profiles supplies information on the spatial distribution of the reaction sites. Since 1987, the {gamma}-ray emission from JET plasmas has been systematically monitored and used successfully in the analysis of heating effects during ICRF and NBI heating in the JET tokamak. The classical character of the fast ion slowing down behaviour has been demonstrated and estimates have been obtained of the fast particle confinement time. The study of sawtooth crashes has demonstrated dramatic spatial redistribution of fast particles and other effects. In recent JET experiments to study the ITER-relevant ICRH scenarios ({sup 3}He)D and ({sup 3}He){sup 4}He, {gamma}-ray measurements provided information on the fast ion population, with the effective temperature of the energetic tail ions being deduced with the help of a {gamma}-ray spectrum simulation code, GAMMOD. In this paper, the main y-ray results are presented and the capabilities of gamma diagnostics are discussed in the light of the ITER-project programme.

  17. Abattoir operations and waste management in Nigeria: A review of ...

    African Journals Online (AJOL)

    Abattoir operations and waste management in Nigeria: A review of challenges ... Log in or Register to get access to full text downloads. ... militating against the establishment, operations and management of abattoirs are not given attention.

  18. IAEA Operational Safety Team Reviews Cattenom Nuclear Power Plant

    International Nuclear Information System (INIS)

    2011-01-01

    Full text: An international team of nuclear installation safety experts led by the International Atomic Energy Agency (IAEA) has reviewed operational safety at France's Cattenom Nuclear Power Plant (NPP) noting a series of good practices as well as recommendations and suggestions to reinforce them. The IAEA assembled an international team of experts at the request of the Government of France to conduct an Operational Safety Review (OSART) of Cattenom NPP. Under the leadership of the IAEA's Division of Nuclear Installation Safety in Vienna, the OSART team performed an in-depth operational safety review of the plant from 14 November to 1 December 2011. The team was made up of experts from Belgium, the Czech Republic, Finland, Germany, Hungary, Japan, Russia, Slovakia, South Africa, Sweden, Ukraine, the United Kingdom and the IAEA. The team at Cattenom conducted an in-depth review of the aspects essential to the safe operation of the NPP, which is largely under the control of the site management. The conclusions of the review are based on the IAEA's Safety Standards. The review covered the areas of Management, Organization and Administration; Training and Qualification; Operations; Maintenance; Technical Support; Operating Experience; Radiation Protection; Chemistry; Emergency Planning and Preparedness; and Severe Accident Management. Cattenom is the first plant in Europe to voluntarily undertake a Severe Accident Management review during an OSART review. The OSART team has identified good plant practices, which will be shared with the rest of the nuclear industry for consideration of their application. Examples include: Sheets are displayed in storage areas where combustible material is present - these sheets are updated readily and accurately by the area owner to ensure that the fire limits are complied with; A simple container is attached to the neutron source handling device to ensure ease and safety of operations and reduce possible radiation exposure during use

  19. Operating experience and performance at Narora Atomic Power Station

    International Nuclear Information System (INIS)

    Mittal, Subhash; Gupta, J.P.

    1998-01-01

    Narora Atomic Power Station consists of two units of 220 MWe capacity each. These are Pressurized Heavy Water Reactors, fuelled by natural uranium, moderated and cooled by heavy water. The Station is owned by Nuclear Power Corporation of India Ltd., which is responsible for design, construction, commissioning, and operation of all nuclear power stations in the country. NAPS was the first opportunity to apply operating experiences in design, keeping in view the evolving safety and seismicity requirements, ease of maintenance, inservice inspection needs, improved construction ability and standardization. Both the units of NAPS are having improved safety standards of current international levels. All the equipment are indigenous with improved quality and reliability. The first unit of the station went critical in March 1989 and synchronized to the grid in July 1989. The second units followed with its criticality in October 1991 and synchronization in January 1992. Considering the initial stabilizing period, the performance of both units of NAPS has progressively improved over the years. The annual capacity factor for NAPS - 1 was 90.01% and for NAPS - 2 was 89.01% for the financial year 1997-1998. This paper presents an analysis of the performance during the last three years and measures taken to improve it. The stated enhanced performance could be achieved by improvement in human performance by training/re-training, scrupulous monitoring and review of equipment/systems, institution of adequate procedure and ensuring their adherence. (authors)

  20. Canadian CANDU fuel development program and recent fuel operating experience

    International Nuclear Information System (INIS)

    Lau, J.H.K.; Inch, W.W.R.; Cox, D.S.; Steed, R.G.; Kohn, E.; Macici, N.N.

    1999-01-01

    This paper reviews the performance of the CANDU fuel in the Canadian CANDU reactors in 1997 and 1998. The operating experience demonstrates that the CANDU fuel has performed very well. Over the 2-year period, the fuel-bundle defect rate for all bundles irradiated in the Canadian CANDU reactors has remained very low, at between 0.006% to 0.016%. On a fuel element basis, this represents an element defect rate of less than about 0.0005%. One of the reasons for the good fuel performance is the support provided by the Canadian fuel research and development programs. These programs address operational issues and provide evolutionary improvements to the fuel products. The programs consist of the Fuel Technology Program, funded by the CANDU Owners Group, and the Advanced Fuel and Fuel Cycles Technology Program, funded by Atomic Energy of Canada Ltd. These 2 programs, which have been in place for many years, complement each other by sharing expert resources and experimental facilities. This paper describes the programs in 1999/2000, to provide an overview of the scope of the programs and the issues that these programs address. (author)

  1. The ATLAS Tier-0: Overview and operational experience

    International Nuclear Information System (INIS)

    Elsing, Markus; Goossens, Luc; Nairz, Armin; Negri, Guido

    2010-01-01

    Within the ATLAS hierarchical, multi-tier computing infrastructure, the Tier-0 centre at CERN is mainly responsible for prompt processing of the raw data coming from the online DAQ system, to archive the raw and derived data on tape, to register the data with the relevant catalogues and to distribute them to the associated Tier-1 centers. The Tier-0 is already fully functional. It has been successfully participating in all cosmic and commissioning data taking since May 2007, and was ramped up to its foreseen full size, performance and throughput for the cosmic (and short single-beam) run periods between July and October 2008. Data and work flows for collision data taking were exercised in several 'Full Dress Rehearsals' (FDRs) in the course of 2008. The transition from an expert to a shifter-based system was successfully established in July 2008. This article will give an overview of the Tier-0 system, its data and work flows, and operations model. It will review the operational experience gained in cosmic, commissioning, and FDR exercises during the past year. And it will give an outlook on planned developments and the evolution of the system towards first collision data taking expected now in late Autumn 2009.

  2. The ATLAS Tier-0 Overview and operational experience

    CERN Document Server

    Elsing, M; Nairz, A; Negri, G

    2010-01-01

    Within the ATLAS hierarchical, multi-tier computing infrastructure, the Tier-0 centre at CERN is mainly responsible for prompt processing of the raw data coming from the online DAQ system, to archive the raw and derived data on tape, to register the data with the relevant catalogues and to distribute them to the associated Tier-1 centers. The Tier-0 is already fully functional. It has been successfully participating in all cosmic and commissioning data taking since May 2007, and was ramped up to its foreseen full size, performance and throughput for the cosmic (and short single-beam) run periods between July and October 2008. Data and work flows for collision data taking were exercised in several "Full Dress Rehearsals" (FDRs) in the course of 2008. The transition from an expert to a shifter-based system was successfully established in July 2008. This article will give an overview of the Tier-0 system, its data and work flows, and operations model. It will review the operational experience gained in cosmic, c...

  3. The ATLAS Tier-0: Overview and operational experience

    Science.gov (United States)

    Elsing, Markus; Goossens, Luc; Nairz, Armin; Negri, Guido

    2010-04-01

    Within the ATLAS hierarchical, multi-tier computing infrastructure, the Tier-0 centre at CERN is mainly responsible for prompt processing of the raw data coming from the online DAQ system, to archive the raw and derived data on tape, to register the data with the relevant catalogues and to distribute them to the associated Tier-1 centers. The Tier-0 is already fully functional. It has been successfully participating in all cosmic and commissioning data taking since May 2007, and was ramped up to its foreseen full size, performance and throughput for the cosmic (and short single-beam) run periods between July and October 2008. Data and work flows for collision data taking were exercised in several "Full Dress Rehearsals" (FDRs) in the course of 2008. The transition from an expert to a shifter-based system was successfully established in July 2008. This article will give an overview of the Tier-0 system, its data and work flows, and operations model. It will review the operational experience gained in cosmic, commissioning, and FDR exercises during the past year. And it will give an outlook on planned developments and the evolution of the system towards first collision data taking expected now in late Autumn 2009.

  4. [Operating Room Nurses' Experiences of Securing for Patient Safety].

    Science.gov (United States)

    Park, Kwang Ok; Kim, Jong Kyung; Kim, Myoung Sook

    2015-10-01

    This study was done to evaluate the experience of securing patient safety in hospital operating rooms. Experiential data were collected from 15 operating room nurses through in-depth interviews. The main question was "Could you describe your experience with patient safety in the operating room?". Qualitative data from the field and transcribed notes were analyzed using Strauss and Corbin's grounded theory methodology. The core category of experience with patient safety in the operating room was 'trying to maintain principles of patient safety during high-risk surgical procedures'. The participants used two interactional strategies: 'attempt continuous improvement', 'immersion in operation with sharing issues of patient safety'. The results indicate that the important factors for ensuring the safety of patients in the operating room are manpower, education, and a system for patient safety. Successful and safe surgery requires communication, teamwork and recognition of the importance of patient safety by the surgical team.

  5. TSTA Piping and Flame Arrestor Operating Experience Data

    Energy Technology Data Exchange (ETDEWEB)

    Cadwallader, Lee C.; Willms, R. Scott

    2014-10-01

    The Tritium Systems Test Assembly (TSTA) was a facility dedicated to tritium handling technology and experiment research at the Los Alamos National Laboratory. The facility operated from 1984 to 2001, running a prototype fusion fuel processing loop with ~100 grams of tritium as well as small experiments. There have been several operating experience reports written on this facility’s operation and maintenance experience. This paper describes analysis of two additional components from TSTA, small diameter gas piping that handled small amounts of tritium in a nitrogen carrier gas, and the flame arrestor used in this piping system. The operating experiences and the component failure rates for these components are discussed in this paper. Comparison data from other applications are also presented.

  6. early experience of operative treatment of pelvic and acetabular

    African Journals Online (AJOL)

    Objective: To review early post-operative results of pelvic and acetabular fracture intern al fixation. Design: ... 600 needing operative treatment annually. ... Infection was controlled with debridement and antibiotics. All the patients in the study returned to their work except one who has yet to do so 5 months after his injury.

  7. Dry cooling tower operating experience in the LOFT reactor

    International Nuclear Information System (INIS)

    Hunter, J.A.

    1980-01-01

    A dry cooling tower has been uniquely utilized to dissipate heat generated in a small experimental pressurized water nuclear reactor. Operational experience revealed that dry cooling towers can be intermittently operated with minimal wind susceptibility and water hammer occurrences by cooling potential steam sources after a reactor scram, by isolating idle tubes from the external atmosphere, and by operating at relatively high pressures. Operating experience has also revealed that tube freezing can be minimized by incorporating the proper heating and heat loss prevention features

  8. Steam generator operating experience update, 1982-1983

    International Nuclear Information System (INIS)

    Frank, L.

    1984-06-01

    This report is a continuation of earlier reports by the staff addressing pressurized water reactor steam generator operating experience. NUREG-0886, Steam Generator Tube Experience, published in February 1982 summarized experience in domestic and foreign plants through December 1981. This report summarizes steam generator operating experience in domestic plants for the years 1982 and 1983. Included are new problems encountered with secondary-side loose parts, sulfur-induced stress-assisted corrosion cracking, and flow-induced vibrational wear in the new preheater design steam generators. The status of Unresolved Safety Issues A3, A4, and A5 is also discussed

  9. Human Factors Engineering (HFE) insights for advanced reactors based upon operating experience

    International Nuclear Information System (INIS)

    Higgins, J.; Nasta, K.

    1997-01-01

    The NRC Human Factors Engineering Program Review Model (HFE PRM, NUREG-0711) was developed to support a design process review for advanced reactor design certification under 10CFR52. The HFE PRM defines ten fundamental elements of a human factors engineering program. An Operating Experience Review (OER) is one of these elements. The main purpose of an OER is to identify potential safety issues from operating plant experience and ensure that they are addressed in a new design. Broad-based experience reviews have typically been performed in the past by reactor designers. For the HFE PRM the intent is to have a more focussed OER that concentrates on HFE issues or experience that would be relevant to the human-system interface (HSI) design process for new advanced reactors. This document provides a detailed list of HFE-relevant operating experience pertinent to the HSI design process for advanced nuclear power plants. This document is intended to be used by NRC reviewers as part of the HFE PRM review process in determining the completeness of an OER performed by an applicant for advanced reactor design certification. 49 refs

  10. Review of modern double beta decay experiments

    Energy Technology Data Exchange (ETDEWEB)

    Barabash, A. S., E-mail: barabash@itep.ru [Institute of Theoretical and Experimental Physics (NRC ”Kurchatov Institute”), B. Cheremushkinskaya 25, Moscow (Russian Federation)

    2015-10-28

    The review of modern experiments on search and studying of double beta decay processes is done. Results of the most sensitive current experiments are discussed. The main attention is paid to EXO-200, KamLAND-Zen, GERDA-I and CUORE-0 experiments. Modern values of T{sub 1/2}(2ν) and best present limits on neutrinoless double beta decay and double beta decay with Majoron emission are presented. Conservative limits on effective mass of a Majorana neutrino (〈m{sub ν}〉 < 0.46 eV) and a coupling constant of Majoron to neutrino (〈g{sub ee}〉 < 1.3 · 10{sup −5}) are obtained. Prospects of search for neutrinoless double beta decay in new experiments with sensitivity to 〈m{sub ν}〉 at the level of ∼ 0.01-0.1 eV are discussed.

  11. Feedback of safety - related operational experience: Lessons learned

    Energy Technology Data Exchange (ETDEWEB)

    Elias, D [Commonwealth Edison Co. (United States)

    1997-09-01

    The presentation considers the following aspects of feedback of safety-related operational experience: lessons learned program, objectives, personnel characteristics; three types of documents for transmitting lessons learned issues.

  12. Feedback of safety - related operational experience: Lessons learned

    International Nuclear Information System (INIS)

    Elias, D.

    1997-01-01

    The presentation considers the following aspects of feedback of safety-related operational experience: lessons learned program, objectives, personnel characteristics; three types of documents for transmitting lessons learned issues

  13. The Gerbil Jar: A Basic Home Experience in Operant Conditioning.

    Science.gov (United States)

    Plant, L.

    1980-01-01

    Explains how a teaching method such as allowing students to raise gerbils at home can encourage students to gain experience with the fundamental techniques of operant conditioning which are otherwise generally unavailable to students in large introductory psychology courses. (DB)

  14. Long-term operating experience for the ATLAS superconducting resonators

    International Nuclear Information System (INIS)

    Pardo, R.; Zinkann, G.

    1999-01-01

    Portions of the ATLAS accelerator have been operating now for over 21 years. The facility has accumulated several million resonator-hours of operation at this point and has demonstrated the long-term reliability of RF superconductivity. The overall operating performance of the ATLAS facility has established a level of beam quality, flexibility, and reliability not previously achieved with heavy-ion accelerator facilities. The actual operating experience and maintenance history of ATLAS are presented for ATLAS resonators and associated electronics systems. Solutions to problems that appeared in early operation as well as current problems needing further development are discussed

  15. A systematic review of peri-operative melatonin

    DEFF Research Database (Denmark)

    Andersen, L P H; Werner, M U; Rosenberg, J

    2014-01-01

    We systematically reviewed randomised controlled trials of peri-operative melatonin. We included 24 studies of 1794 participants that reported eight peri-operative outcomes: anxiety; analgesia; sleep quality; oxidative stress; emergence behaviour; anaesthetic requirements; steal induction......%, respectively. Qualitative reviews suggested the melatonin improved sleep quality and emergence behaviour, and might be capable of reducing oxidative stress and anaesthetic requirements....

  16. Decentralization of operating reactor licensing reviews: NRR Pilot Program

    International Nuclear Information System (INIS)

    Hannon, J.N.

    1984-07-01

    This report, which has incorporated comments received from the Commission and ACRS, describes the program for decentralization of selected operating reactor licensing technical review activities. The 2-year pilot program will be reviewed to verify that safety is enhanced as anticipated by the incorporation of prescribed management techniques and application of resources. If the program fails to operate as designed, it will be terminated

  17. Duke staff tap into a fund of operating experience

    International Nuclear Information System (INIS)

    Anon.

    1997-01-01

    The benefits of the Operating Experience Database (OEDB) allows employees of the nuclear industry to access a fund of operating experience data on-line in order to help them make appropriate management decisions concerning problem solving for various plant-based problems. Recent successful uses include fire protection system design, improving compliance with technical specifications, and reducing unnecessary trips in turbines. It is anticipated that OEDB may well be used in the Ukraine and Russia in the future. (UK)

  18. Operating experience feedback report: Experience with pump seals installed in reactor coolant pumps manufactured by Byron Jackson

    International Nuclear Information System (INIS)

    Bell, L.G.; O'Reilly, P.D.

    1992-09-01

    This report examines the reactor coolant pump (RCP) seal operating experience through August 1990 at plants with Byron Jackson (B-J) RCPs. ne operating experience examined in this analysis included a review of the practice of continuing operation with a degraded seal. Plants with B-J RCPs that have had relatively good experience with their RCP seals attribute this success to a combination of different factors, including: enhanced seal QA efforts, modified/new seal designs, improved maintenance procedures and training, attention to detail, improved seal operating procedures, knowledgeable personnel involved in seal maintenance and operation, reduction in frequency of transients that stress the seals, seal handling and installation equipment designed to the appropriate precision, and maintenance of a clean seal cooling water system. As more plants have implemented corrective measures such as these, the number of B-J RCP seal failures experienced has tended to decrease. This study included a review of the practice of continued operation with a degraded seal in the case of PWR plants with Byron Jackson reactor coolant pumps. Specific factors were identified which should be addressed in order to safety manage operation of a reactor coolant pump with indications of a degrading seal

  19. Lessons from feedback of safety operating experience for reactor physics

    International Nuclear Information System (INIS)

    Suchomel, J.; Rapavy, S.

    1999-01-01

    Analyses of events in WWER operations as a part of safety experience feedback provide a valuable source of lessons for reactor physics. Examples of events from Bohunice operation will be shown such as events with inadequate approach to criticality, positive reactivity insertions, expulsion of a control rod from shut-down reactor, problems with reactor protection system and control rods. (Authors)

  20. Precision operation of the Nova laser for fusion experiments

    International Nuclear Information System (INIS)

    Caird, J.A.; Ehrlich, R.B.; Hermes, G.L.; Landen, O.L.; Laumann, C.W.; Lerche, R.A.; Miller, J.L.; Murray, J.E.; Nielsen, N.D.; Powell, H.T.; Rushford, M.C.; Saunders, R.L.; Thompson, C.E.; VanArsdall, P.J.; Vann, C.S.; Weiland, T.L.

    1994-01-01

    The operation of a Neodymium glass laser of a special design for fusion experiments is improved by a better pulse synchronization, the gain stabilization, and the laser diagnostics. We used sensor upgrading and antifriction coating of focusing lenses. The pointing accuracy of the Nova laser meets now our goal for precision operation. (AIP) copyright 1994 American Institute of Physics

  1. The VEPP-2000 Collider Control System: Operational Experience

    CERN Document Server

    Senchenko, A I; Lysenko, A P; Rogovsky, Yu A; Shatunov, P Yu

    2017-01-01

    The VEPP-2000 collider was commissioned and operated successfully in 2010-2013. During the operation the facility underwent continuous updates and experience in maintenance was acquired. Strong cooperation between the staff of the accelerator complex and the developers of the control system proved effective for implementing the necessary changes in a short time.

  2. Transfer operations with tritium: a review

    International Nuclear Information System (INIS)

    Folkers, C.L.; Gede, V.P.

    1975-01-01

    Controlled thermonuclear reactors will involve pumping operations with tritium that may involve pressures ranging from submillipascals to megapascals. A variety of pumps are available that can cover portions of this range, and these can be staged to cover the entire pressure range. Some of these pumps can be adapted to virtually any size requirement currently anticipated. Special attention must be paid to operating features and construction materials. (U.S.)

  3. 14th Biennial conference on reactor operating experience plant operations: The human element

    International Nuclear Information System (INIS)

    Anon.

    1989-01-01

    Separate abstracts were prepared for the papers presented in the following areas of interest: enhancing operator performance; structured approaches to maintenance standards and reliability-centered maintenance; human issues in plant operations and management; test, research, and training reactor utilization; methods and applications of root-cause analysis; emergency operating procedure enhancement programs; test, research, and training reactor upgrades; valve maintenance and diagnostics; recent operating experiences; and current maintenance issues

  4. The experience of five years operation of Phenix

    International Nuclear Information System (INIS)

    Conte, F.; Lacroix, A.

    1980-01-01

    Two long periods of exceptional operation have satisfied the hopes of the designers and all parameters, power, efficiency, load factor, fuel behaviour, were better than was expected. The experience resulting from the only major incident provided a series of complementary data. Modern technology has need of sanction by experiment. The Phenix type reactor is a tool which is convenient to operate and to maintain. The two aspects of the demonstration, correct operation and ease of maintenance, take a concrete form in the harmlessness of Phenix on men and on the environment. There is no irradiation and few releases. (orig./DG)

  5. Operational safety experience feedback by means of unusual event reports

    International Nuclear Information System (INIS)

    1996-07-01

    Operational experience of nuclear power plants can be used to great advantage to enhance safety performance provided adequate measures are in place to collect and analyse it and to ensure that the conclusions drawn are acted upon. Feedback of operating experience is thus an extremely important tool to ensure high standards of safety in operational nuclear power plants and to improve the capability to prevent serious accidents and to learn from minor deviations and equipment failures - which can serve as early warnings -to prevent even minor events from occurring. Mechanisms also need to be developed to ensure that operating experience is shared both nationally as well as internationally. The operating experience feedback process needs to be fully and effectively established within the nuclear power plant, the utility, the regulatory organization as well as in other institutions such as technical support organizations and designers. The main purpose of this publication is to reflect the international consensus as to the general principles and practices in the operational safety experience feedback process. The examples of national practices for the whole or for particular parts of the process are given in annexes. The publication complements the IAEA Safety Series No.93 ''Systems for Reporting Unusual Events in Nuclear Power Plants'' (1989) and may also give a general guidance for Member States in fulfilling their obligations stipulated in the Nuclear Safety Convention. Figs, tabs

  6. Operational safety experience feedback by means of unusual event reports

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-07-01

    Operational experience of nuclear power plants can be used to great advantage to enhance safety performance provided adequate measures are in place to collect and analyse it and to ensure that the conclusions drawn are acted upon. Feedback of operating experience is thus an extremely important tool to ensure high standards of safety in operational nuclear power plants and to improve the capability to prevent serious accidents and to learn from minor deviations and equipment failures - which can serve as early warnings -to prevent even minor events from occurring. Mechanisms also need to be developed to ensure that operating experience is shared both nationally as well as internationally. The operating experience feedback process needs to be fully and effectively established within the nuclear power plant, the utility, the regulatory organization as well as in other institutions such as technical support organizations and designers. The main purpose of this publication is to reflect the international consensus as to the general principles and practices in the operational safety experience feedback process. The examples of national practices for the whole or for particular parts of the process are given in annexes. The publication complements the IAEA Safety Series No.93 ``Systems for Reporting Unusual Events in Nuclear Power Plants`` (1989) and may also give a general guidance for Member States in fulfilling their obligations stipulated in the Nuclear Safety Convention. Figs, tabs.

  7. Operational safety experience reporting in the United States

    International Nuclear Information System (INIS)

    Hartfield, R.A.

    1978-01-01

    Licensees of nuclear power plants in the United States have many reporting requirements included in their technical specifications and the code of federal regulations, title 10. The Nuclear Regulatory Commisson receives these reports and utilizes them in its regulatory program. Part of this usage includes collecting and publishing this operating experience data in various reports and storing information in various data systems. This paper will discuss the data systems and reports on operating experience published and used by the NRC. In addition, some observations on operating experience will be made. Subjects included will be the Licensee Event Report (LER) Data File, the Operating Unit Status Report (Gray Book), Radiation Exposure Reports, Effluents Reports, the Nuclear Plant Reliability Data System, Current Events, Bulletin Wrapups and Annual Summaries. Some of the uses of the reports and systems will be discussed. The Abnormal Occurence Report to the US Congress will also be described and discussed. (author)

  8. Flooding PSA with Plant Specific Operating Experiences of Korean PWRs

    International Nuclear Information System (INIS)

    Choi, Sun Yeong; Yang, Joon Yull

    2006-01-01

    The purpose of this paper is to update the flooding PSA with Korean plant specific operating experience data and the appropriate estimation method for the flooding frequency to improve the PSA quality. The existing flooding PSA used the NPE (Nuclear Power Experience) database up to 1985 for the flooding frequency. They are all USA plant operating experiences. So an upgraded flooding frequency with Korean specific plant operation experience is required. We also propose a method of only using the PWR (Pressurized Water Reactor) data for the flooding frequency estimation in the case of the flooding area in the primary building even though the existing flooding PSA used both PWR and BWR (Boiled Water Reactor) data for all kinds of plant areas. We evaluate the CDF (Core Damage Frequency) with the modified flooding frequency and compare the results with that of the existing flooding PSA method

  9. Operations experience with the NAC-1 legal weight truck cask

    International Nuclear Information System (INIS)

    Viebrock, J.M.; Hoffman, C.C.

    1978-01-01

    The first three years of operation of Nuclear Assurance Corporation's (NAC) four (4) NAC-1 Casks have demonstrated that shipments of spent fuel, fuel rods and other highly irradiated reactor components can be moved routinely by legal weight truck transport. Shipments of these materials have involved some 800,000 miles of highway travel and cask handling at some fifteen different nuclear facilities. This paper presents details on NAC's operations experience with these casks including cask description, cask handling (loading and unloading), pre-shipment testing, facility turnaround and transit times, operator exposure, transport vehicles and shipper/carrier/cask owner responsibilities, actual experience with regard to facility interfacing requirements and operational procedures. Cask and equipment utilization is discussed together with the methods used to control operation costs and to improve the economics of truck transport

  10. Nuclear power plant operation experience - a feedback programme

    International Nuclear Information System (INIS)

    Banica, I.; Sociu, F.; Margaritescu, C.

    1994-01-01

    An effective high quality maintenance programme is required for the safe reliable operation of a nuclear power plant. To achieve the objectives of such a programme, both plant management and staff must be highly dedicated and motivated to perform high quality work at all levels. Operating and maintenance experience data collections and analysis are necessary in order to enhance the safety of the plant and reliability of the structures systems and components throughout their operating life. Significant events, but also minor incident, may reveal important deficiencies or negative trends adverse to safety. Therefore, a computer processing system for collecting, classifying and evaluating abnormal events or findings concerning operating-maintenance and for feeding back the results of the lessons learned from experience into the design and the operation of our nuclear power plant is considered to be of paramount importance. (Author)

  11. EBR-II: twenty years of operating experience

    International Nuclear Information System (INIS)

    Lentz, G.L.; Buschman, H.W.; Smith, R.N.

    1985-01-01

    Experimental Breeder Reactor No. 2 (EBR-II) is an unmoderated, sodium-cooled reactor with a design power of 62.5 MWt. For the last 20 years EBR-II has operated safely, has demonstrated stable operating characteristics, has shown excellent performance of its sodium components, and has had an excellent plant factor. These years of operating experience provide a valuable resource to the nuclear community for the development and design of future liquid metal fast reactors. This report provides a brief description of the EBR-II plant and its early operating experience, describes some recent problems of interest to the nuclear community, and also mentions some of the significant operating achievements of EBR-II. Finally, a few words and speculations on EBR-II's future are offered. 4 figs., 1 tab

  12. Recent operating experiences and programs at EBR-II

    International Nuclear Information System (INIS)

    Lentz, G.L.

    1984-01-01

    Experimental Breeder Reactor No. II (EBR-II) is a pool-type, unmoderated, sodium-cooled reactor with a design power of 62.5 MWt and an electrical generation capability of 20 MW. It has been operated by Argonne National Laboratory for the US government for almost 20 years. During that time, it has operated safely and has demonstrated stable operating characteristics, high availability, and excellent performance of its sodium components. The 20 years of operating experience of EBR-II is a valuable resource to the nuclear community for the development and design of future LMFBR's. Since past operating experience has been extensively reported, this report will focus on recent programs and events

  13. Radiological operating experience at FFTF [Fast Flux Test Facility

    International Nuclear Information System (INIS)

    Bunch, W.L.; Prevo, P.R.

    1986-11-01

    The Fast Flux Test Facility has been in operation for approximately five years, including about one thousand days of full power operation of the Fast Test Reactor. During that time the collective dose equivalents received by operating personnel have been about two orders of magnitude lower than those typically received at commercial light water reactors. No major contamination problems have been encountered in operating and maintaining the plant, and release of radioactive gas to the environment has been minimal and well below acceptable limits. All shields have performed satisfactorily. Experience to date indicates an apparent radiological superiority of liquid metal reactor systems over current light water plants

  14. Risk management for operations of the LANL Critical Experiments Facility

    International Nuclear Information System (INIS)

    Paternoster, R.; Butterfield, K.

    1998-01-01

    The Los Alamos Critical Experiments Facility (LACEF) currently operates two burst reactors (Godiva-IV and Skua), one solution assembly [the Solution High-Energy Burst Assembly (SHEBA)], two fast-spectrum benchmark assemblies (Flattop and Big Ten), and five general-purpose remote assembly machines that may be configured with nuclear materials and assembled by remote control. Special nuclear materials storage vaults support these and other operations at the site. With this diverse set of operations, several approaches are possible in the analysis and management of risk. The most conservative approach would be to write a safety analysis report (SAR) for each assembly and experiment. A more cost-effective approach is to analyze the probability and consequences of several classes of operations representative of operations on each critical assembly machine and envelope the bounding case accidents. Although the neutron physics of these machines varies widely, the operations performed at LACEF fall into four operational modes: steady-state mode, approach-to-critical mode, prompt burst mode, and nuclear material operations, which can include critical assembly fuel loading. The operational sequences of each mode are very nearly identical, whether operated on one assembly machine or another. The use of an envelope approach to accident analysis is facilitated by the use of classes of operations and the use of bounding case consequence analysis. A simple fault tree analysis of operational modes helps resolve which operations are sensitive to human error and which are initiated by hardware of software failures. Where possible, these errors and failures are blocked by TSR LCOs. Future work will determine the probability of accidents with various initiators

  15. The Clearing House on Operating Experience Feedback (CH-OEF)

    International Nuclear Information System (INIS)

    Tanarro Colodron, J.

    2016-01-01

    Full text: The Clearing House on Operating Experience Feedback (CH-OEF) is an online information system that contains three technical databases available only to registered users: 1) Operating Experience Feedback (OEF) records, containing information about events occurred at Nuclear Power Plants; 2) Nuclear Power Plant (NPP) records, containing technical details about NPPs; 3) Documents about operating experience, such as the Topical Operating Experience Reports (TOERs) and the quarterly reports on nuclear power plant events. The main objective of the information system is to develop communication, cooperation and sharing of operating experience amongst the national nuclear regulatory authorities participating in EU Clearinghouse network. The CH-OEF is essential for the preparation and dissemination of the quarterly reports on NPP events. These reports are published every three months and are intended to be complementary to other international reporting systems, containing mainly recent information publicly available. Only events that are considered to be likely to have lessons applicable to EU NPPs or with a real or potential impact on nuclear safety are addressed in the reports. The CH-OEF is a fundamental tool for their preparation, providing specific features for a more efficient sharing of information as well as for facilitating the related discussion and decision making. (author

  16. Concluding from operating experience to instrumentation and control systems

    International Nuclear Information System (INIS)

    Pleger, H.; Heinsohn, H.

    1997-01-01

    Where conclusions are drawn from operating experience to instrumentation and control systems, two general statements should be made. First: There have been braekdowns, there have also been deficiencies, but in principle operating experience with the instrumentation and control systems of German nuclear power plants has been good. With respect to the debates about the use of modern digital instrumentation and control systems it is safe to say, secondly, that the instrumentation and control systems currently in use are working reliably. Hence, there is no need at present to replace existing systems for reasons of technical safety. However, that time will come. It is a good thing, therefore, that the use of modern digital instrumentation and control systems is to begin in the field of limiting devices. The operating experience which will thus be accumulated will benefit digital instrumentation and control systems in their qualification process for more demanding applications. This makes proper logging of operating experience an important function, even if it cannot be transferred in every respect. All parties involved therefore should see to it that this operating experience is collected in accordance with criteria agreed upon so as to prevent unwanted surprises later on. (orig.) [de

  17. European Clearinghouse for Nuclear Power Plants Operational Experience Feedback

    International Nuclear Information System (INIS)

    Martin Ramos, M.; Noel, M.

    2010-01-01

    In the European Union, in order to support the Community activities on operational experience, a centralized regional network on nuclear power plants operational experience feedback (European Clearinghouse on Operational Experience Feedback for Nuclear Power Plants) was established in 2008 at the EC JRC-IE, Petten (The Netherlands) on request of nuclear Safety Authorities of several Member States. Its main goal is to improve the communication and information sharing on OEF, to promote regional collaboration on analyses of operational experience and dissemination of the lessons learned. The enlarged EU Clearinghouse was launched in April 2010, and it is currently gathering the Regulatory Authorities of Finland, Hungary, Lithuania, the Netherlands, Romania, Slovenia, Switzerland, Bulgaria, Czec Republic, France, Germany, Slovak Republic, and Spain (these last six countries as observers). The OECD Nuclear Energy Agency, the IAEA, the EC Directorates General of the JRC and ENER are also part of the network. Recently, collaboration between some European Technical Support Organizations (such IRSN and GRS) and the EU Clearinghouse has been initiated. This paper explains in detail the objectives and organization of the EU Clearinghouse, as well as the most relevant activities carried out, like research work in trend analysis of events ocurred in NPP, topical reports on particular events, dissemination of the results, quarterly reports on events reported publicly and operational experience support to the members of the EU Clearinghouse. (Author)

  18. US nuclear power plant operating cost and experience summaries

    International Nuclear Information System (INIS)

    Kohn, W.E.; Reid, R.L.; White, V.S.

    1998-02-01

    NUREG/CR-6577, U.S. Nuclear Power Plant Operating Cost and Experience Summaries, has been prepared to provide historical operating cost and experience information on U.S. commercial nuclear power plants. Cost incurred after initial construction are characterized as annual production costs, representing fuel and plant operating and maintenance expenses, and capital expenditures related to facility additions/modifications which are included in the plant capital asset base. As discussed in the report, annual data for these two cost categories were obtained from publicly available reports and must be accepted as having different degrees of accuracy and completeness. Treatment of inconclusive and incomplete data is discussed. As an aid to understanding the fluctuations in the cost histories, operating summaries for each nuclear unit are provided. The intent of these summaries is to identify important operating events; refueling, major maintenance, and other significant outages; operating milestones; and significant licensing or enforcement actions. Information used in the summaries is condensed from annual operating reports submitted by the licensees, plant histories contained in Nuclear Power Experience, trade press articles, and the Nuclear Regulatory Commission (NRC) web site (www.nrc.gov)

  19. US nuclear power plant operating cost and experience summaries

    Energy Technology Data Exchange (ETDEWEB)

    Kohn, W.E.; Reid, R.L.; White, V.S.

    1998-02-01

    NUREG/CR-6577, U.S. Nuclear Power Plant Operating Cost and Experience Summaries, has been prepared to provide historical operating cost and experience information on U.S. commercial nuclear power plants. Cost incurred after initial construction are characterized as annual production costs, representing fuel and plant operating and maintenance expenses, and capital expenditures related to facility additions/modifications which are included in the plant capital asset base. As discussed in the report, annual data for these two cost categories were obtained from publicly available reports and must be accepted as having different degrees of accuracy and completeness. Treatment of inconclusive and incomplete data is discussed. As an aid to understanding the fluctuations in the cost histories, operating summaries for each nuclear unit are provided. The intent of these summaries is to identify important operating events; refueling, major maintenance, and other significant outages; operating milestones; and significant licensing or enforcement actions. Information used in the summaries is condensed from annual operating reports submitted by the licensees, plant histories contained in Nuclear Power Experience, trade press articles, and the Nuclear Regulatory Commission (NRC) web site (www.nrc.gov).

  20. Design and operating experiences with 50MW steam generator

    International Nuclear Information System (INIS)

    Kawara, M.; Yamaki, H.; Kanamori, A.; Tanaka, K.; Takahashi, T.

    1975-01-01

    The main purpose of the 50 MW steam generator is to have experiences of manufacturing and operation with large scale steam generator including necessary research and development works which can be reflected on the design and fabrication of 'Monju' (Japan 300 MWe prototype LMFBR). The detailed design of the 50 MW steam, generator was begun on March, 1972 and succeeded in the demonstration of 72 hours continuous operation with full power on June, 1974. It has been successfully operated since then, the performances of which have been evaluated through various kinds of tests. In this paper, the following items are mainly discussed system design, thermal and hydraulic design, structure and fabrication and some experiences on testing operation including cleaning and sodium flushing of equipment, sodium level control system, the behavior of hydrogen detection system and general outlook of the performance. (author)

  1. Telescience testbed: Operational support functions for biomedical experiments

    Science.gov (United States)

    Yamashita, Masamichi; Watanabe, Satoru; Shoji, Takatoshi; Clarke, Andrew H.; Suzuki, Hiroyuki; Yanagihara, Dai

    A telescience testbed was conducted to study the methodology of space biomedicine with simulated constraints imposed on space experiments. An experimental subject selected for this testbedding was an elaborate surgery of animals and electrophysiological measurements conducted by an operator onboard. The standing potential in the ampulla of the pigeon's semicircular canal was measured during gravitational and caloric stimulation. A principal investigator, isolated from the operation site, participated in the experiment interactively by telecommunication links. Reliability analysis was applied to the whole layers of experimentation, including design of experimental objectives and operational procedures. Engineering and technological aspects of telescience are discussed in terms of reliability to assure quality of science. Feasibility of robotics was examined for supportive functions to reduce the workload of the onboard operator.

  2. Design and operating experiences with 50MW steam generator

    Energy Technology Data Exchange (ETDEWEB)

    Kawara, M; Yamaki, H; Kanamori, A; Tanaka, K; Takahashi, T

    1975-07-01

    The main purpose of the 50 MW steam generator is to have experiences of manufacturing and operation with large scale steam generator including necessary research and development works which can be reflected on the design and fabrication of 'Monju' (Japan 300 MWe prototype LMFBR). The detailed design of the 50 MW steam, generator was begun on March, 1972 and succeeded in the demonstration of 72 hours continuous operation with full power on June, 1974. It has been successfully operated since then, the performances of which have been evaluated through various kinds of tests. In this paper, the following items are mainly discussed system design, thermal and hydraulic design, structure and fabrication and some experiences on testing operation including cleaning and sodium flushing of equipment, sodium level control system, the behavior of hydrogen detection system and general outlook of the performance. (author)

  3. LMFBR operational safety: the EBR-II experience

    International Nuclear Information System (INIS)

    Sackett, J.I.; Allen, N.L.; Dean, E.M.; Fryer, R.M.; Larson, H.A.; Lehto, W.K.

    1978-01-01

    The mission of the Experimental Breeder Reactor II (EBR-II) has evolved from that of a small LMFBR demonstration plant to a major irradiation-test facility. Because of that evolution, many operational-safety issues have been encountered. The paper describes the EBR-II operational-safety experience in four areas: protection-system design, safety-document preparation, tests of off-normal reactor conditions, and tests of elements with breached cladding

  4. Current operations and experiments at the Tritium Systems Test Assembly

    International Nuclear Information System (INIS)

    Bartlit, J.R.; Anderson, J.L.

    1985-01-01

    The Tritium Systems Test Assembly (TSTA) has continued to move toward operation of a fully-integrated, full-sized, computer-controlled fusion fuel processing loop. Concurrent, nonloop experiments have answered important questions on new components and issues such as palladium diffusion membranes, ceramic electrolysis cells, regenerable tritium getters, laser Raman spectroscopy, unregenerable tritium inventory on molecular sieves, tritium contamination problems and decontamination methods, and operating data on reliability, emissions, doses, and wastes generated. 4 refs., 2 figs

  5. Simulator experiments on operator reliability and training effectiveness

    International Nuclear Information System (INIS)

    Singh, A. Spurgin, A.J.

    1990-01-01

    This paper discusses some aspects of the Operator Reliability Experiments project sponsored by Electric Power Research Institute. The paper deals with modifications to the HCR correlation which have resulted from the study of operators in responding to nuclear accident scenarios using emergency procedures. The interpretation of time response data and how insights in crew performance can lead to improvements in not only crew performance but also in training effectiveness are discussed

  6. Development of new HRA methods based upon operational experience

    International Nuclear Information System (INIS)

    Cooper, S.E.; Luckas, W.J.; Barriere, M.T.; Wreathall, J.

    2004-01-01

    Under the auspices of the US Nuclear Regulatory Commission (NRC), previously unaddressed human reliability issues are being investigated in order to support the development of human reliability analysis (HRA) methods for both low power and shutdown (LP and S) and full-power conditions. Actual operational experience, such as that reported in Licensee Event Reports (LERs), have been used to gain insights and provide a basis for the requirements of new HRA methods. In particular, operational experience has shown that new HRA methods for LP and S must address human-induced initiators, errors of commission, mistakes (vs. slips), dependencies, and the effects of multiple performance shaping factors (PSFs). (author)

  7. Gynaecomastia correction: A review of our experience

    Directory of Open Access Journals (Sweden)

    Arvind Arvind

    2014-01-01

    Full Text Available Introduction: Gynaecomastia is a common problem in the male population with a reported prevalence of up to 36%. Various treatment techniques have been described but none have gained universal acceptance. We reviewed all gynaecomastia patients operated on by one consultant over a 7-year period to assess the morbidity and complication rates associated with the procedure. Materials and Methods: Clinical notes and outpatient records of all patients who underwent gynaecomastia correction at University Hospital North Staffordshire between 01/10/2001 to 01/10/2009 were retrospectively reviewed. A modified version of the Breast Evaluation Questionnaire was used to assess patients satisfaction with the procedure. Results: Twenty-nine patients and a total of 53 breasts were operated on during the study period. Patients underwent either liposuction alone (6 breasts - 11.3%, excision alone (37 breasts - 69.8% or both excision and liposuction (10 breasts - 18.9%. Twelve operated breasts (22.6% experienced some form of complication. Minor complications included seroma (2 patients, superficial wound dehiscence (2 patients and minor bleeding not requiring theatre (3 patients. Two patients developed haematomas requiring evacuation in theatre. No cases of wound infection, major wound dehiscence or revision surgery were encountered. Twenty-six patients (89.7% returned the patient satisfaction questionnaire. Patients scored an average 4.12 with regards comfort of their chest in different settings, 3.98 with regards chest appearance in different settings, and 4.22 with regards satisfaction levels for themselves and their partner/family. Overall complication rate was 22.6%. Grade III patients experienced the highest complication rate (35.7%, followed by grade II (22.7% and grade I (17.6%. Overall complication rates among the excision only group was the highest (29.8% followed by the liposuction only group (16.7% and the liposuction and excision group (10.0%. There

  8. Operating experience on radiation reduction in the latest BWRs

    International Nuclear Information System (INIS)

    Ohsumi, K.; Uchida, S.; Aizawa, M.; Takagi, K.; Amano, O.; Yamashita, K.

    1988-01-01

    In Japan, BWR plants have been operated commercially since 1970, and the reduction of radiation exposure has been an important concern. The application of the procedure for reducing occupational exposure is incorporated in Japanese Improvement and Standardization Program for LWRs. No.2 and No.4 plants in Fukushima No.2 Nuclear Power Station were designed and constructed as the latest 1,100 MWe BWRs in conformity with the Improvement and Standardization Program. No.2 plant began the commercial operation in February, 1984, and experienced three times of the scheduled annual maintenance outage. No.4 plant began the commercial operation in September, 1987, and the first annual maintenance is scheduled from September, 1988. In this paper, discussion is focused on recent radiation reduction measures, that is the control of iron and nickel in primary coolant for reducing the radiation dose rate in primary systems, based on the experience with No.2 and No.4 plants. The design concept of a low radiation dose rate nuclear power plant, the experience on water chemistry in No.2 plant, the control of iron and nickel in No.4 plant operation and so on are reported. It is believed that these operation experiences contribute to the reduction of occupational exposure in BWR plants currently in operation and in future. (Kako, I.)

  9. Clinical Experience of Auditory Brainstem Response Testing on Pediatric Patients in the Operating Room

    Directory of Open Access Journals (Sweden)

    Guangwei Zhou

    2012-01-01

    Full Text Available Objectives. To review our experience of conducting auditory brainstem response (ABR test on children in the operating room and discuss the benefits versus limitations of this practice. Methods. Retrospective review study conducted in a pediatric tertiary care facility. A total of 267 patients identified with usable data, including ABR results, medical and surgical notes, and follow-up evaluation. Results. Hearing status successfully determined in all patients based on the ABR results form the operating room. The degrees and the types of hearing loss also documented in most of the cases. In addition, multiple factors that may affect the outcomes of ABR in the operating room identified. Conclusions. Hearing loss in children with complicated medical issues can be accurately evaluated via ABR testing in the operating room. Efforts should be made to eliminate adverse factors to ABR recording, and caution should be taken when interpreting ABR results from the operating room.

  10. Operational experience of a large area x-ray camera for protein crystallography

    International Nuclear Information System (INIS)

    Joachimiak, A.; Jorden, A. R.; Loeffen, P. W.; Naday, I.; Sanishvili, R.; Westbrook, E. M.

    1999-01-01

    After 3 years experience of operating very large area (210mm x 210mm) CCD-based detectors at the Advanced Photon Source, operational experience is reported. Four such detectors have been built, two for Structural Biology Center (APS-1 and SBC-2), one for Basic Energy Sciences Synchrotrons Radiation Center (Gold-2) at Argonne National Laboratory's Advanced Photon Source and one for Osaka University by Oxford Instruments, for use at Spring 8 (PX-21O). The detector is specifically designed as a high resolution and fast readout camera for macromolecular crystallography. Design trade-offs for speed and size are reviewed in light of operational experience and future requirements are considered. Operational data and examples of crystallography data are presented, together with plans for more development

  11. Operating Experience with Power Reactors. Proceedings of the Conference on Operating Experience with Power Reactors. Vol. I

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1963-10-15

    At the beginning of 1963 nuclear power plants produced some 3 500 000kW of electrical power to different distribution grids around the world. Much significant operating experience has been gained with these power reactors, but this experience is often not collected in such a way as to make it easily available. The International Atomic Energy Agency convened a Conference on Operating Experience with Power Reactors in Vienna from 4-8 June 1963 which was attended by 240 participants representing 27 of the Agency's Member States and six international organizations. At the Conference, 42 papers giving detailed experience with more than 20 nuclear power stations were discussed. Although similar meetings on a national or regional scale have been held earlier in various countries, this is the first arranged by the Agency on a world-wide basis. Some of the detailed material may have been given earlier but for the most part it represents new and recently acquired experience, and for the first time it has been possible to compile in one place such extensive material on the operating experience with power reactors. The Conference discussed the experience gained both generally in the context of national and international nuclear power development programmes, and more specifically in the detailed operating experience with different power reactor stations. In addition, various plant components, fuel cycles, staffing of nuclear plants and licensing of such staff were treated. It is hoped that these Proceedings will be of interest not only to nuclear plant designers and operators who daily encounter problems similar to those discussed by the Conference, but also to those guiding the planning and implementation of power development programmes.

  12. Operating Experience with Power Reactors. Proceedings of the Conference on Operating Experience with Power Reactors. Vol. II

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1963-10-15

    At the beginning of 1963 nuclear power plants produced some 3 500 000 kW of electrical power to different distribution grids around the world. Much significant operating experience has been gained with these power reactors, but this experience is often not collected in such a way as to make it easily available. The International Atomic Energy Agency convened a Conference on Operating Experience with Power Reactors in Vienna from 4 -8 June 1963 which was attended by 240 participants representing 27 of the Agency's Member States and six international organizations. At the Conference, 42 papers giving detailed experience with more than 20 nuclear power stations were discussed. Although similar meetings on a national or regional scale have been held earlier in various countries, this is the first arranged by the Agency on a world-wide basis. Some of the detailed material may have been given earlier but for the most part it represents new and recently acquired experience, and for the first time it has been possible to compile in one place such extensive material on the operating experience with power reactors. The Conference discussed the experience gained both generally in the context of national and international nuclear power development programmes, and more specifically in the detailed operating experience with different power reactor stations. In addition, various plant components, fuel cycles, staffing of nuclear plants and licensing of such staff were treated. It is hoped that these Proceedings will be of interest not only to nuclear , plant designers and operators who daily encounter problems similar to those discussed by the Conference, but also to those guiding the planning and implementation of power development programmes.

  13. Methodological frontier in operational analysis for roundabouts: a review

    Directory of Open Access Journals (Sweden)

    Orazio Giuffre'

    2016-11-01

    Full Text Available Several studies and researches have shown that modern roundabouts are safe and effective as engineering countermeasures for traffic calming, and they are now widely used worldwide. The increasing use of roundabouts and, more recently, turbo and flower roundabouts, has induced a great variety of experiences in the field of intersection design, traffic safety and capacity modelling. As for unsignalized intersections which represent the starting point to extend knowledge about the operational analysis to roundabouts, the general situation in capacity estimation is still characterized by the discussion between gap acceptance models and empirical regression models. However, capacity modelling must contain both the analytical construction and then solution of the model, and the implementation of driver behavior. Thus, issues on a realistic modelling of driver behavior by the parameters that are included into the models are always of interest for practioners and analysts in transportation and road infrastructure engineering. Based on these considerations, this paper presents a literature review about the key methodological issues in the operational analysis of modern roundabouts. Focus is made on the aspects associated with the gap acceptance behavior, the derivation of the analytical-based models and the calculation of parameters included into the capacity equations, as well as steady state and non-steady state conditions and uncertainty in entry capacity estimation. At last, insights on future developments of the research in this field of investigation will be also outlined.

  14. Spanish Power Exchange Market Concepts and Operating Experience

    International Nuclear Information System (INIS)

    Gonzalez, J. J.; Gamito, C.

    2000-01-01

    On January, 1st, 1998, the Spanish Electricity Market started operations. All generators, distributors, commercialization companies, and final consumers negotiate al power exchanges either through the spot market or using bilateral contracts. The Spanish Power Exchange Market Operator (Compania Operadora del Mercado Espanol de electricidad, OMEL) is responsible for the management of the market and for the economic settlement and billing of a transactions on the Power Exchange market, and the technical operational process handled by the System Operator. This paper describes in detail the Spanish market principles and the experience gathered through the design, installation and first two years of market operation. The paper presents also the Spanish market results from January 1998 up to December 1999 indicating each specific market results and aggregate statistics. (Author)

  15. Design improvements, construction and operating experience with BWRs in Japan

    International Nuclear Information System (INIS)

    Uchigasaki, G.; Yokomi, M.; Sasaki, M.; Aoki, R.; Hashimoto, H.

    1983-01-01

    (1) The first domestic-made 1100-MW(e) BWR in Japan commenced commercial operation in April 1982. The unit is the leading one of the subsequent three in Fukushima Daini nuclear power station owned by the Tokyo Electric Power Company Inc. (Tepco). Based on the accumulated construction and operation experience of 500-MW(e) and 800-MW(e) class BWRs, improvements in various aspects during both the design and construction stages were introduced in core and fuel design with advanced gadolinia distribution, reactor feedwater treatment technology for crud reduction, a radwaste island, control and instrumentation to cope with the lessons learned through Three Mile Island assessment etc. (2) Based on many operating experiences with BWRs, an improved BWR core, which has easier operability and higher load factor than the conventional core, has been developed. The characteristic of the improved core is ''axially two-zoned uranium enrichment distribution''; the enrichment of the upper part of the fuel is slightly higher than that of the lower part. Through the improved core it became possible to optimize the axial power flattening and core reactivity control separately by axial enrichment distribution and burnable poison content. The improved fuels were loaded into operating BWRs and successfully proved the performance by this experience. (3) To shorten annual outage time, to reduce radiation exposure, to save manpower, and to achieve high reliability and safety of inspection operation, the remote automatic service and inspection equipment were developed in Japan. This paper presents the concept, distinctive features, and actual operation experience of the automatic refuelling machine, control-rod drive (CRD) remote-handling machine, improved main steam line isolation plug, and the automated ultrasonic inspection system with a computerized data processing unit, which have been developed by Hitachi, Ltd. with excellent results. (author)

  16. Review of the ATLAS experiment at the LHC (CERN)

    International Nuclear Information System (INIS)

    Taylor, G.

    1998-01-01

    Full text: This talk gives in overview of the physics program for the next generation high energy physics experiments at CERN's Large Hadron Collider (LHC). Emphasis will be on the ATLAS experiment and in particular on the Australian participation in that experiment. Australian physicists from Melbourne, Sydney and Wollongong are playing a significant role in the development, production, installation and operation of the ambitious Semiconductor Tracker (SCT) in the ATLAS' Inner Detector. The SCT, particularly important for the detection and measurement of high energy electrons, will be essential in the search for the Higgs Boson through electron decay channels (amongst other reactions). The design calls for a total detector surface area an order of magnitude larger than in current silicon detectors, in a harsh radiation environment. Prodigious data rates and high speed electronics add to the complications of this detector. The talk will review progress and describe the schedule for the completion of the SCT and ATLAS

  17. US nuclear safety. Review and experience

    International Nuclear Information System (INIS)

    Hanauer, S.H.

    1977-01-01

    The paper deals with the evolution of reactor safety principles, design bases, regulatory requirements, and experience in the United States. Safety concerns have evolved over the years, from reactivity transients and shut-down systems, to blowdowns and containment, to severe design basis accidents and mitigating systems, to the performance of actual materials, systems and humans. The primary safety concerns of one epoch have been superseded in considerable measure by those of later times. Successive plateaus of technical understanding are achieved by solutions being found to earlier problems. Design studies, research, operating experience and regulatory imperatives all contribute to the increased understanding and thus to the safety improvements adopted and accepted. The improvement of safety with time, and the ability of existing reactors to operate safely in the face of new concerns, has confirmed the correctness and usefulness of the defence-in-depth approach and safety margins used in safety design in the United States of America. A regulatory programme such as the one in the United States justifies its great cost by its important contributions to safety. Yet only the designers, constructors and operators of nuclear power plants can actually achieve public safety. The regulatory programme audits, assesses and spot-checks the actual work. Since neither materials nor human beings are flawless, mistakes will be made; that is why defence-in-depth and safety margins are provided. The regulatory programme should enhance safety by decreasing the frequency of uncorrected mistakes. Maintenance of public safety also requires technical and managerial competence and attention in the organizations responsible for nuclear plants as well as regulatory organizations. (author)

  18. ALARA Review of the SHAARS Operation

    International Nuclear Information System (INIS)

    Kekana, R.M.T.

    2010-01-01

    The SHARS mobile hot cell was designed and manufactured by Necsa intended to address the problem of disused Spent High Activity Radioactive Sources (SHARS) from teletherapy units, gamma irradiators and brachytherapy units. This unit is to be used in countries with no remote infrastructure to handle SHARS. The hot cell was designed for a 3.7E+13Bq (1000Ci) activity although it was demonstrated that it can handle even more than 7.4E+13Bq (2000Ci). The unit has a biological shield which consists of river sand sandwiched between metal plates and a viewing window filled with 50% zinc bromide solution. The unit was designed to provide sufficient shielding to ensure that doses are kept ALARA (As low As Reasonably Achieved). This paper compares the modelled dose rates with the actual measured doses during operations conducted in Sudan, Tanzania and Uruguay. It also presents the key lessons learned in the application of the ALARA principle during the SHARS missions. The new working practices and additional methods are proposed in order to reduce doses in accordance with the ALARA principle. (author)

  19. National culture and operations management : a structured literature review

    NARCIS (Netherlands)

    Boscari, Stefania; Bortolotti, Thomas; Netland, Torbjorn; Rich, Nicholas

    2018-01-01

    National culture has received a substantial amount of interest in the operations management literature. We present the first structured review of articles studying national culture in operations management. Our search returned 51 papers published in ten leading journals between 2000 and 2017. We

  20. EBO feed water distribution system, experience gained from operation

    Energy Technology Data Exchange (ETDEWEB)

    Matal, O. [Energovyzkum, Brno (Switzerland); Schmidt, S.; Mihalik, M. [Atomove Elektrarne Bohunice, Jaslovske Bohunice (Switzerland)

    1997-12-31

    Advanced feed water distribution systems of the EBO design have been installed into steam generators at Units 3 and 4 of the NPP Jaslovske Bohunice (VVER 440). Experiences gained from the operation of steam generators with the advanced feed water distribution systems are discussed in the paper. (orig.). 4 refs.

  1. EBO feed water distribution system, experience gained from operation

    Energy Technology Data Exchange (ETDEWEB)

    Matal, O [Energovyzkum, Brno (Switzerland); Schmidt, S; Mihalik, M [Atomove Elektrarne Bohunice, Jaslovske Bohunice (Switzerland)

    1998-12-31

    Advanced feed water distribution systems of the EBO design have been installed into steam generators at Units 3 and 4 of the NPP Jaslovske Bohunice (VVER 440). Experiences gained from the operation of steam generators with the advanced feed water distribution systems are discussed in the paper. (orig.). 4 refs.

  2. Operating experience and corrective action program at Ontario Hydro Nuclear

    International Nuclear Information System (INIS)

    Collingwood, Barry; Turner, David

    1998-01-01

    This is a slide-based talk given at the COG/IAEA: 5. Technical Committee Meeting on 'Exchange of operating experience of pressurized heavy water reactors'. In the introduction there are presented the operating experience (OPEX) program of OHN, and the OPEX Program Mission, ensuring that the right information gets to the right staff at the right time. The OPEX Processes are analysed. These are: - Internal Corrective Action; - Inter-site Lesson Transfer; - External Lesson Transfer; - External Posting of OHN Events; - Internalizing Operating Experience. Steps in solving the Corrective Action Program are described: - Identify the Problem; - Notify Immediate Supervision/Manager; - Evaluate the Problem; - Correct the Problem; Monitor/Report Status. The Internal Corrective Action is then presented as a flowchart. The internalizing operating experience is presented under three aspects: - Communication; - Interface; - Training. The following items are discussed, respectively: peer meetings, department/section meetings, safety meetings, e-mail folders, newsletters and bulletin boards; work planning, pre-job briefings, supervisors' briefing cards; classroom initial and refresher (case studies), simulator, management courses. A diagram is presented showing the flow and treatment of information within OHN, centered on the weekly screening meetings. Finally, the corrective action processes are depicted in a flowchart and analysed in details

  3. A review of healthy condition for reactor operators of NPP

    International Nuclear Information System (INIS)

    Zhang Chi; Yang Di; Zhu Lixin; Zhou Limin

    2008-01-01

    Physical health is one of fundamental elements and the necessary qualification for holding operator license or senior operator license of a nuclear power plant issued by NNSA. Based upon requirements for healthy qualification of reactor operators in nuclear safety regulations and some new issued regulations, especially some involved national standard (GB), review direction, relevant contents and criteria were described, and some suggestions were provided in this paper. (authors)

  4. Operating experience feedback from safety significant events at research reactors

    Energy Technology Data Exchange (ETDEWEB)

    Shokr, A.M. [Atomic Energy Authority, Abouzabal (Egypt). Egypt Second Research Reactor; Rao, D. [Bhabha Atomic Research Centre, Mumbai (India)

    2015-05-15

    Operating experience feedback is an effective mechanism to provide lessons learned from the events and the associated corrective actions to prevent recurrence of events, resulting in improving safety in the nuclear installations. This paper analyzes the events of safety significance that have been occurred at research reactors and discusses the root causes and lessons learned from these events. Insights from literature on events at research reactors and feedback from events at nuclear power plants that are relevant to research reactors are also presented along with discussions. The results of the analysis showed the importance of communication of safety information and exchange of operating experience are vital to prevent reoccurrences of events. The analysis showed also the need for continued attention to human factors and training of operating personnel, and the need for establishing systematic ageing management programmes of reactor facilities, and programmes for safety management of handling of nuclear fuel, core components, and experimental devices.

  5. PFR experience of bellows operating in sodium systems

    International Nuclear Information System (INIS)

    Hodgson, D.

    1980-01-01

    Although there was little operating experience with bellows in sodium systems available during the design phase of the UK 250 MWe prototype fast reactor, bellows were extensively utilised to seal valves and to overcome the problems of differential thermal movements in several important applications. However, because of this lack of operational experience in sodium and the non-availability of design codes it was considered prudent not to install bellows in situations where failure could possibly initiate events of unpredictable proportions, or in positions where replacement following failure would be extremely difficult i.e. involving complete shutdown of the reactor over an extended period (in excess of six months) and/or necessitate removal of large quantities of primary sodium from the reactor vessel. This paper describes some of the bellows units installed in the PFR and the performance achieved during six years of reactor operation

  6. Operating experience feedback from safety significant events at research reactors

    International Nuclear Information System (INIS)

    Shokr, A.M.

    2015-01-01

    Operating experience feedback is an effective mechanism to provide lessons learned from the events and the associated corrective actions to prevent recurrence of events, resulting in improving safety in the nuclear installations. This paper analyzes the events of safety significance that have been occurred at research reactors and discusses the root causes and lessons learned from these events. Insights from literature on events at research reactors and feedback from events at nuclear power plants that are relevant to research reactors are also presented along with discussions. The results of the analysis showed the importance of communication of safety information and exchange of operating experience are vital to prevent reoccurrences of events. The analysis showed also the need for continued attention to human factors and training of operating personnel, and the need for establishing systematic ageing management programmes of reactor facilities, and programmes for safety management of handling of nuclear fuel, core components, and experimental devices.

  7. TSTA piping and flame arrestor operating experience data

    Energy Technology Data Exchange (ETDEWEB)

    Cadwallader, Lee C., E-mail: Lee.Cadwallader@inl.gov [Idaho National Laboratory, Idaho Falls, ID (United States); Willms, R. Scott [ITER International Organization, Cadarache (France)

    2015-10-15

    Highlights: • Experiences from the Tritium Systems Test Assembly were examined. • Failure rates of copper piping and a flame arrestor were calculated. • The calculated failure rates compared well to similar data from the literature. • Tritium component failure rate data support fusion safety assessment. - Abstract: The Tritium Systems Test Assembly (TSTA) was a facility dedicated to tritium handling technology and experiment research at the Los Alamos National Laboratory. The facility was operated with tritium for its research and development program from 1984 to 2001, running a prototype fusion fuel processing loop with ∼100 g of tritium as well as small experiments. There have been several operating experience reports written on this facility's operation and maintenance experience. This paper describes reliability analysis of two additional components from TSTA, small diameter copper gas piping that handled tritium in a nitrogen carrier gas, and the flame arrestor used in this piping system. The component failure rates for these components are discussed in this paper. Comparison data from other applications are also presented.

  8. Review of decision aids for nuclear-plant operators

    International Nuclear Information System (INIS)

    Kisner, R.A.

    1983-01-01

    Responses to various computer-based operational aids varied widely in detail, thus forcing distillation of the salient features of many operational aids from information sources other than the initial questionnaire. These sources included technical and management presentations, technical papers and reports, personal discussions, taped responses, sales brochures, system specifications and schematics, and other documents. The data base is dynamic, not static, owing to the nature of current trends in operational aid development. The information contained in it is subject to review and revision by the developing organizations. More systems are pending review and entry into the data base; hence the list is incomplete

  9. Recent operating experiences with steam generators in Japanese NPPs

    International Nuclear Information System (INIS)

    Yashima, Seiji

    1997-01-01

    In 1994, the Genkai-3 of Kyushu Electric Power Co., Inc. and the Ikata-3 of Shikoku Electric Power Co., Inc. started commercial operation, and now 22 PWR plants are being operated in Japan. Since the first PWR plant now 22 PWR plants are being operated in was started to operate, Japanese PWR plants have had an operating experience of approx. 280 reactor-years. During that period, many tube degradations have been experienced in steam generators (SGs). And, in 1991, the steam generator tube rupture (SGTR) occurred in the Mihama-2 of Kansai Electric Power Co., Inc. However, the occurrence of tube degradation of SGs has been decreased by the instructions of the MITI as regulatory authorities, efforts of Electric Utilities, and technical support from the SG manufacturers. Here the author describes the recent SGs in Japan about the following points. (1) Recent Operating Experiences (2) Lessons learned from Mihama-2 SGTR (3) SG replacement (4) Safety Regulations on SG (5) Research and development on SG

  10. Operating experience of Fugen-HWR in Japan

    International Nuclear Information System (INIS)

    Yoshino, F.

    1991-01-01

    Fugen is a 165 MWe prototype heavy water reactor which mainly uses plutonium-uranium mixed oxide (MOX) fuel. Power Reactor and Nuclear Fuel Development Corporation (PNC) has taken responsibility for the advanced thermal reactor (ATR) project, with its name 'FUGEN' taken from the Buddhist God of Mercy. The project started in October 1967, to develop and establish the technology for this new type of reactor and to clarify MOX fuel performance in the reactor. Site construction began in December 1970 at Tsuruga and the plant commenced commercial operation on March 20, 1979. Since then, Fugen has been operated successfully for more than twelve years. The plant performance and reliability of this type of reactor has been demonstrated through the operation. All these operational experiences have contributed to the establishment of the ATR technology

  11. Operating experience of Fugen-HWR in Japan

    Energy Technology Data Exchange (ETDEWEB)

    Yoshino, F [Reactor Regulation Division, Nuclear Safety Bureau, Science and Technology Agency, Tokyo (Japan)

    1991-04-01

    Fugen is a 165 MWe prototype heavy water reactor which mainly uses plutonium-uranium mixed oxide (MOX) fuel. Power Reactor and Nuclear Fuel Development Corporation (PNC) has taken responsibility for the advanced thermal reactor (ATR) project, with its name 'FUGEN' taken from the Buddhist God of Mercy. The project started in October 1967, to develop and establish the technology for this new type of reactor and to clarify MOX fuel performance in the reactor. Site construction began in December 1970 at Tsuruga and the plant commenced commercial operation on March 20, 1979. Since then, Fugen has been operated successfully for more than twelve years. The plant performance and reliability of this type of reactor has been demonstrated through the operation. All these operational experiences have contributed to the establishment of the ATR technology.

  12. Operating experience with superconducting cavities at the TESLA test facility

    International Nuclear Information System (INIS)

    Moeller, Wolf-Dietrich

    2003-01-01

    A description of the TESLA Test Facility, which has been set up at DESY by the TeV Energy Superconducting Accelerator (TESLA) collaboration, will be given as it is now after five years of installation and operation. The experience with the first three modules, each containing 8 superconducting 9-cell cavities, installed and operated in the TTF-linac will be described. The measurements in the vertical and horizontal cryostats as well as in the modules will be compared. Recent results of the operation at the TESLA design current, macropulses of 800 μsec with bunches of 3.2 nC at a rate of 2.25 MHz are given. New measurement results of the higher order modes (HOM) will be presented. The operation and optimisation of the TTF Free Electron Laser (TTF-FEL) will also be covered in this paper. (author)

  13. The BGL coal gasification process - development status, operational experience and potential applications

    Energy Technology Data Exchange (ETDEWEB)

    Williams, A.R.; Brown, D.J.; H. Hirschfelder [Advantica Technologies Ltd., Loughborough (United Kingdom)

    2006-07-01

    The BGL gasifier's fixed bed mode of operation makes for significant operational differences to the various entrained flow bed gasification processes currently available, whilst the slagging lower half offers considerable advantages over older processes in terms of efficiency and steam usage. This paper reviews operating experience of the BGL process on a variety of feedstocks and presents economic and technical assessments of the application of the BGL gasifier for IGCC, Syngas and SNG applications under current market conditions. Finally there a survey of the status of new BGL gasification projects and the scope of the current BGL technology is offering. 2 figs., 3 tabs., 2 photos.

  14. Best practices in the utilization and dissemination of operating experience at nuclear power plants

    International Nuclear Information System (INIS)

    2008-03-01

    IAEA Safety Standards Series No. SF-1 entitled Fundamental Safety Principles: Safety Fundamentals states the need for operating organizations to establish a programme for the collection and analysis of operating experience in nuclear power plants. Such a programme ensures that operating experience is analysed, events important to safety are reviewed in depth, lessons learned are disseminated to the staff of the organization and to relevant national and international organizations, operating experience is utilized and corrective actions are effectively implemented. This publication has been developed to provide advice and assistance to nuclear installations and related institutions, including contractors and support organizations, to strengthen and enhance their own feedback process through the implementation of best practices in the utilization and dissemination of operating experience and to assess their effectiveness. Dissemination and utilization of internal and external operating experience is essential in supporting a proactive safety management approach of preventing events from occurring. Few new events reveal a completely new cause or failure mechanism. Although not recognized prior to the event, most subsequent investigations identify internal or external industry operating experience that, if applied effectively, would have prevented the event. Therefore, the establishment of an effective utilization and dissemination process is very beneficial in raising awareness of the organization and individuals of available operating experience, and focussing effort in the implementation of the lessons learnt. This leads to improved safety and reliability. The present publication is the outcome of a coordinated effort involving the participation of experts of nuclear organizations in several Member States. It was written to complement the publication IAEA Services Series No. 10 entitled PROSPER Guidelines - Guidelines for Peer Review and for Plant Self-assessment of

  15. Cernavoda NPP Unit 1: Operating experience program and plant specific performance indicators (level 2)

    International Nuclear Information System (INIS)

    Teodor, Vasile; Popa, Viorel

    1998-01-01

    The basis for the Operating Experience Program was set in place since early stages of the commissioning phase (1993), when a system based on the Canadian approach was implemented for reporting, reviewing, assessing and establishing of the necessary corrective action for unplanned events. This system provided excellent opportunity to train staff in unplanned event assessment methodology, and prepare the station for the formal reporting process following criticality in accordance with the licensing requirements. The formal process, set in place after criticality is described in Station Instruction Procedure SI-01365-P13 'Unplanned Event Report' and was developed under the supervision of Safety and Compliance Department. In parallel, a program for information exchange and trending of performance indicators was developed by Technical Services Department. The WANO recommendations following August 1997 Peer Review provided the opportunity for a better understanding and reconsideration of the Operating Experience Program. As a result, all the activities related to this topic were assigned to a new structure, within Safety and Compliance Department. As such an Operating Experience Group was created and a new program is now being developed in an integrated and centralized manner. The content of the paper is the following: - Overview; - Operating Experience Program; - Event Analysis (Unplanned Events Assessment System - UEIR Process- and Systematic Analysis of Operational Events - ACR Process); - Information Exchange Program; - Monitoring of Operating Experience - Plant Specific Performance Indicators; - Purpose; - Level 2 Performance Indicators. Four appendices are added containing: - A. Station performance indicators/targets (Level 2); - B. SPI (Station Performance Indicators - Level 2) - Graphics; - C. UEIR, LRS (Safety and Licensing Review Sheet), UEFR (Unplanned Event Follow-up Report), ACR and OPEX forms. (authors)

  16. Experiences of operation for Ikata Nuclear Power Station

    International Nuclear Information System (INIS)

    Kashimoto, Shigeyuki

    1979-01-01

    No. 1 plant in the Ikata Nuclear Power Station, Shikoku Electric Power Co., Inc., is a two-loop PWR unit with electric output of 566 MW, and it began the commercial operation on September 30, 1977, as the first nuclear power station in Shikoku. It is the 13th LWR and 7th PWR in Japan. The period of construction was 52 months since it had been started in June, 1973. During the period, it became the object of the first administrative litigation to seek the cancellation of permission to install the reactor, and it was subjected to the influence of the violent economical variation due to the oil shock, but it was completed as scheduled. After the start of operation, it continued the satisfactory operation, and generated about 2.35 billion KWh for 4300 operation hours. It achieved the rate of utilization of 96.7%. Since March 28, 1978, the first periodical inspection was carried out, and abnormality was not found in the reactor, the steam generator and the fuel at all. The period of inspection was 79 days and shorter than expected. The commercial operation was started again on June 14. The outline of the Ikata Nuclear Power Station, its state of operation, and the periodical inspection are reported. Very good results were able to be reported on the operation for one year, thanks to the valuable experiences offered by other electric power companies. (Kako, I.)

  17. Operating experience with superconducting cavities at Jefferson Lab

    International Nuclear Information System (INIS)

    Reece, C.E.

    1998-01-01

    The CEBAF recirculating superconducting electron linac at Jefferson Lab is now in full operation supporting nuclear physics experiments in three target halls at up to 4.4 GeV. The 330 SRF cavities, operating at 2.0 K, continue to perform well above design specifications, and have accumulated over 8,000,000 operating cavity hours. The authors have to date no evidence of degradation of cavity performance. The SRF cavities have demonstrated excellent reliability. The one klystron per cavity design provides CEBAF with flexibility and redundancy for normal operations. Several techniques have been developed for establishing optimum operating conditions for the 330 independent systems. Operation of the cavities and control systems at the full design current of 1 mA has recently been achieved. The principal constraints on usable gradient for low current operations are (1) discharge at the cold ceramic rf window induced by electron field emission in cavities, (2) tuner controls, and (3) stability of the waveguide vacuum in the region between the warm and cold windows. Several cryomodules have been improved by application of rf helium processing while installed on the beamline

  18. Constellation Mission Operation Working Group: ESMO Maneuver Planning Process Review

    Science.gov (United States)

    Moyer, Eric

    2015-01-01

    The Earth Science Mission Operation (ESMO) Project created an Independent Review Board to review our Conjunction Risk evaluation process and Maneuver Planning Process to identify improvements that safely manages mission conjunction risks, maintains ground track science requirements, and minimizes overall hours expended on High Interest Events (HIE). The Review Board is evaluating the current maneuver process which requires support by multiple groups. In the past year, there have been several changes to the processes although many prior and new concerns exist. This presentation will discuss maneuver process reviews and Board comments, ESMO assessment and path foward, ESMO future plans, recent changes and concerns.

  19. British Columbia Power Export Corporation: Operational review for operating year, October 1989 to September 1990

    International Nuclear Information System (INIS)

    1990-01-01

    The British Columbia Power Export Corporation (POWEREX) is a wholly owned subsidiary of British Columbia Hydro, established in 1988 as the single agency responsible for implementing the provincial policy of international electricity trade. POWEREX objectives are to conduct long term firm electricity trade utilizing private sector financing, operating capabilities, and generating sources. Short term electricity transactions are handled by the part of POWEREX called the Powerex Pool Operation. An operational review of POWEREX for 1989-90 is presented, giving information on export contracts, license approvals, export sales negotiations, pool operation revenues and sales, British Columbia Hydro generation and integrated system performance, and operational planning. 15 figs

  20. [Nurses' experiences of stalking: a narrative review].

    Science.gov (United States)

    Comparcini, Dania; Simonetti, Valentina; Lupo, Roberto; Cicolini, Giancarlo

    2015-01-01

    This narrative review aimed to synthetize the results of the main studies analysing nurses' experience of stalking in different clinical settings. We searched the electronic databases MEDLINE (through PubMed), CINAHL (through EBSCOhost) and the search engine "Google Scholar". Searches were limited to articles published in English and Italian, and published between 1999 and 2013. Stalking refers to a behavioural pattern characterized by persistent unwanted communications and contacts imposed to another person, which, consequently suffer from distress, fear, and anxiety. Several studies explored the risk of stalking in healthcare system, especially in doctors and psychiatrists. Some authors analysed nurses' experience of stalking with particular attention to mental health professionals as a group category with an increased risk of stalking by patients. Results of some studies carried out in different clinical settings (medical and surgical areas, and other healthcare settings) also revealed, even if in a minority, the presence of this phenomenon, showing the presence of staking's behaviours by patients and healthcare colleagues too. However, more researches with large sample size are needed to better understand the phenomenon of stalking in nurses working in different clinical areas.

  1. Experiences on operation, maintenance and utilization in JRR-2

    International Nuclear Information System (INIS)

    1994-08-01

    The Japan Research Reactor No.2 (JRR-2) is a high performance 10 MW multi purpose research reactor, heavy water moderated and cooled enriched uranium fuel used. Since the first criticality was attained in October, 1960, JRR-2 has been operated to satisfy the utilization demands, such as irradiation of fuel and materials, neutron beam experiments, radio isotope production and B.N.C.T (Boron Neutron Capture Therapy). During the operation, various kinds of troubles mainly caused by the old design concept had been occurred at the JRR-2 systems and components. Those troubles were solved with adequate countermeasures of timely repairs and large scale modifications with newest techniques. The works above were completely carried out by the staff of JRR-2 and related divisions. As a result, JRR-2 became one of the oldest research reactors which are still under operation in the world. Since JRR-2 has been utilized for more than 30 years, the operation mode was changed from 12 days-one cycle to 3 days-one cycle in April, 1994, taking into consideration aging of the reactor systems. In this paper, the experiences of JRR-2 for more than 30 years such as operation, maintenance, repair, modifications and utilization on JRR-2 are described. (author)

  2. Operational experience from a large EPICS-based accelerator facility

    International Nuclear Information System (INIS)

    Ciarlette, D.J.; Gerig, R.

    1995-01-01

    The Advanced Photon Source (APS) at Argonne National Laboratory is a third-generation x-ray light source which uses the Experimental Physics and Industrial Control System (EPICS) to operate its linear accelerator, positron accumulator ring, booster synchrotron, and storage ring equipment. EPICS has been used at the APS since the beginning of installation and commissioning. Currently, EPICS controls approximately 100 VME crates containing over 100,000 process variables. With this complexity, the APS has had to review some of the methods originally employed and make changes as necessary. In addition, due to commissioning and operational needs, higher-level operator software needed to be created. EPICS has been flexible enough to allow this

  3. Adverse childhood experience and asthma onset: a systematic review.

    Science.gov (United States)

    Exley, Daniel; Norman, Alyson; Hyland, Michael

    2015-06-01

    Adverse childhood experiences such as abuse and neglect are associated with subsequent immune dysregulation. Some studies show an association between adverse childhood experiences and asthma onset, although significant disparity in results exists in the published literature. We aimed to review available studies employing a prospective design that investigates associations between adverse childhood experience and asthma. A search protocol was developed and studies were drawn from four electronic journal databases. Studies were selected in accordance with pre-set inclusion criteria and relevant data were extracted. 12 studies, assessing data from a total of 31 524 individuals, were identified that investigate the impact of a range of adverse childhood experiences on the likelihood of developing asthma. Evidence suggests that chronic stress exposure and maternal distress in pregnancy operate synergistically with known triggers such as traffic-related air pollution to increase asthma risk. Chronic stress in early life is associated with an increased risk of asthma onset. There is evidence that adverse childhood experience increases the impact of traffic-related air pollution and inconsistent evidence that adverse childhood experience has an independent effect on asthma onset. Copyright ©ERS 2015.

  4. Experiments on the Impact of language Problems in the Multi-cultural Operation of NPPs' Emergency Operation

    International Nuclear Information System (INIS)

    Kang, Seongkeun; Kim, Taehoon; Seong, Poong Hyun; Ha, Jun Su

    2016-01-01

    In 2010, The Korea Electric Power Corporation (KEPCO) was awarded a multi-billion dollar bid to construct the first nuclear power plant in Barakah, UAE. One must keep in mind however, that with technology transfer and international cooperation comes a host of potential problems arising from cultural differences such as language, everyday habitudes and workplace expectation. As of now, how problematic these potential issues may become is unknown. Of the aforementioned factors, communication is perhaps of foremost importance. We investigated UAE culture-related issues through analysis of operating experience reviews (OERs) and came to the conclusion that the language barrier needed utmost attention. Korean nuclear power plant operators will work in UAE and will operate the NPPs with operators and managers of other nationalities as well. The purpose of this paper is firstly to confirm that operators are put under mental stress, and secondly to demonstrate the decline in accuracy when they must work in English. Reducing human error is quite important to make nuclear power plants safer. As the mental workload of human operator is increased, the probability of a human error occurring also increases. It will have a negative influence on the plant’s safety. There are many factors which can potentially increase mental workload. We focused on communication problem which is a key factor of increasing mental workload because many Korean operators will work in UAE nuclear power plants and may work together with UAE operators. From these experiments we compared how performance of both Korean and UAE subjects were decreased when they use English. We designed experimental methods to be able to check this problem qualitatively and quantitatively. We analyzed four factors to find the communication problems from the experiments which are accuracy, efficiency, NASA-TLX, and brain wave. Accuracy, efficiency, brain wave are quantitative factors, and NASA-TLX is qualitative factor. To

  5. Experiments on the Impact of language Problems in the Multi-cultural Operation of NPPs' Emergency Operation

    Energy Technology Data Exchange (ETDEWEB)

    Kang, Seongkeun; Kim, Taehoon; Seong, Poong Hyun [KAIST, Daejeon (Korea, Republic of); Ha, Jun Su [KUSTAR, Abu Dhabi (United Arab Emirates)

    2016-10-15

    In 2010, The Korea Electric Power Corporation (KEPCO) was awarded a multi-billion dollar bid to construct the first nuclear power plant in Barakah, UAE. One must keep in mind however, that with technology transfer and international cooperation comes a host of potential problems arising from cultural differences such as language, everyday habitudes and workplace expectation. As of now, how problematic these potential issues may become is unknown. Of the aforementioned factors, communication is perhaps of foremost importance. We investigated UAE culture-related issues through analysis of operating experience reviews (OERs) and came to the conclusion that the language barrier needed utmost attention. Korean nuclear power plant operators will work in UAE and will operate the NPPs with operators and managers of other nationalities as well. The purpose of this paper is firstly to confirm that operators are put under mental stress, and secondly to demonstrate the decline in accuracy when they must work in English. Reducing human error is quite important to make nuclear power plants safer. As the mental workload of human operator is increased, the probability of a human error occurring also increases. It will have a negative influence on the plant’s safety. There are many factors which can potentially increase mental workload. We focused on communication problem which is a key factor of increasing mental workload because many Korean operators will work in UAE nuclear power plants and may work together with UAE operators. From these experiments we compared how performance of both Korean and UAE subjects were decreased when they use English. We designed experimental methods to be able to check this problem qualitatively and quantitatively. We analyzed four factors to find the communication problems from the experiments which are accuracy, efficiency, NASA-TLX, and brain wave. Accuracy, efficiency, brain wave are quantitative factors, and NASA-TLX is qualitative factor. To

  6. Vitrification operational experiences and lessons learned at the WVDP

    International Nuclear Information System (INIS)

    Hamel, W.F. Jr.; Sheridan, M.J.; Valenti, P.J.

    1997-01-01

    The Vitrification Facility (VF) at the West Valley Demonstration Project (WVDP) commenced full, high-level radioactive waste (HLW) processing activities in July 1996. The HLW consists of a blend of washed plutonium-uranium extraction (PUREX) sludge, neutralized thorium extraction (THOREX) waste, and cesium-loaded zeolite. The waste product is borosilicate glass contained in stainless steel canisters, sealed for eventual disposal in a federal repository. This paper discusses the WVDP vitrification process, focusing on operational experience and lessons learned during the first year of continuous, remote operation

  7. Procedure for following external nuclear power plant operating experience

    International Nuclear Information System (INIS)

    Kostadinov, V.

    2003-01-01

    Slovenian Nuclear Safety Administration (SNSA) has developed computer database and the procedure for following-up and investigating external nuclear operating experience and administrative requirements. The SNSA's primary goal is to investigate safety significant events in due time, to analyze them from the regulatory point of view and to ensure that meaningful lessons be learned and used for improvement of the safe operation of Slovenian Nuclear Power Plant Krsko. Moreover, we intend to make uniform format and method for reporting broader spectrum of events analyzed including low level event reporting. (author)

  8. Operational experience of ATLAS SCT and Pixel Detector

    CERN Document Server

    Kocian, Martin; The ATLAS collaboration

    2017-01-01

    The ATLAS Inner Detector based on silicon sensors is consisting of a strip detector (SCT) and a pixel detector. It is the crucial component for vertexing and tracking in the ATLAS experiment. With the excellent performance of the LHC well beyond the original specification the silicon tracking detectors are facing substantial challenges in terms of data acquisition, radiation damage to the sensors, and SEUs in the readout ASICs. The approaches on how the detector systems cope with the demands of high luminosity operation while maintaining excellent performance through hardware upgrades, software and firmware algorithms, and operational settings, are presented.

  9. Nuclear power plant operating experience. Annual report, 1978

    International Nuclear Information System (INIS)

    Beebe, M.R.

    1979-12-01

    This report is the fifth in a series of reports issued annually that summarizes the operating experience of US nuclear power plants in commercial operation. Power generation statistics, plant outages, reportable occurrences, fuel element performance, occupational radiation exposure for each plant are presented. Summary highlights of these areas are discussed. The report includes 1978 data from 65 plants - 25 boiling water reactor plants and 40 pressurized water reactor plants. Discussion of radioactive effluents which has been a part of this report in previous years, has not been included in this issue because of late acquisition of data

  10. Analysis of operating experience of nuclear power plants

    International Nuclear Information System (INIS)

    Volta, G.; Amesz, J.; Mancini, G.

    1981-01-01

    The power reactors operating experience has been matter for studies at the Joint Research Centre of the C.E.C. with the aim of validating probabilistic analysis models and of setting up data banks concerning reliability, availability of components and systems and safety related events. The report shows problems encountered and solutions given to attain the goal. For what concerns validation, the need of more satisfactory models that could handle both the technical and the organizational aspects of an operating plant is shown. For what concerns the data banks the possibilities opened by a coherent international system of classification are underlined. (author)

  11. Operating experiences and degradation detection for auxiliary feedwater systems

    International Nuclear Information System (INIS)

    Casada, D.; Farmer, W.S.

    1992-01-01

    A study of Pressurized Water Reactor Auxiliary Feedwater (AFW) Systems has been conducted by Oak Ridge National Laboratory (ORNL) under the auspices of the Nuclear Regulatory Commission's Nuclear Plant Aging Research Program. The results of the study are documented in NUREG/CR-5404, Vol. 1, Auxiliary Feedwater System Aging Study. The study reviewed historical failure experience and current monitoring practices for the AFW System. This paper provides an overview of the study approach and results

  12. Operational Experience and Performance with the ATLAS Pixel detector

    CERN Document Server

    Martin, Christopher Blake; The ATLAS collaboration

    2018-01-01

    The tracking performance of the ATLAS detector relies critically on its 4-layer Pixel Detector, that has undergone significant hardware and software upgrades to meet the challenges imposed by the higher collision energy, pileup and luminosity that are being delivered by the Large Hadron Collider, with record breaking instantaneous luminosities of $1.3\\times10^{34}\\text{cm}^{{-2}}\\text{s}^{{-1}}$ recently surpassed. The key status and performance metrics of the ATLAS Pixel Detector are summarized, and the operational experience and requirements to ensure optimum data quality and data taking efficiency are described, with special emphasis to radiation damage experience.

  13. Operational Experience and Performance with the ATLAS Pixel detector

    CERN Document Server

    Martin, Christopher Blake; The ATLAS collaboration

    2018-01-01

    The tracking performance of the ATLAS detector relies critically on its 4-layer Pixel Detector, that has undergone significant hardware and software upgrades to meet the challenges imposed by the higher collision energy, pileup and luminosity that are being delivered by the Large Hadron Collider, with record breaking instantaneous luminosities of 1.3 x 10^34 cm-2 s-1 recently surpassed. The key status and performance metrics of the ATLAS Pixel Detector are summarised, and the operational experience and requirements to ensure optimum data quality and data taking efficiency are described, with special emphasis to radiation damage experience.

  14. Clinical Education Environment Experiences of Operating Room Students

    Directory of Open Access Journals (Sweden)

    Tahereh khazaei

    2016-01-01

    Full Text Available Background and purpose: The objective of medical education is to train competent and qualified workforce in order to provide services in various health environments. One of the important objectives of Operating Room students is to train workforce who can involve in patient’s health and recovery. Training these students should cause clinical ability and independent decision making during surgery. Since students during internship face with many problems, this study has been conducted to explore and describe the challenges and experiences.Methods: This qualitative study is a phenomenology that was conducted based on 20 students in the last semester of Operating Room associate’s degree with purposive sampling. Deep and semi-structured interviews were used to collect data and data were analyzed by content analysis method.Results: The findings in 5 main themes: (1 Physical space and equipment in the operating room, (2 The student’s position in operating room, (3 Integrating knowledge and action, (4 Managing education environment and 5- Student’s viewpoint about operating room and working in it.Conclusions: Interviews with students revealed the educational environment challenges with which they are faced during their study. Teachers can provide solutions to overcome the challenges and create a positive atmosphere for students' learning using results of this study and students may continue their interest in education and improve the quality of their education.Keywords: CLINICAL EDUCATION, OPERATING ROOM STUDENTS, CHALLENGE

  15. Safety aspects and operating experience of LWR plants in Japan

    International Nuclear Information System (INIS)

    Aoki, S.; Yoshioka, T.; Toyota, M.; Hinoki, M.

    1977-01-01

    To develop nuclear power generation for the future, it is necessary to put further emphasis on safety assurance and to endeavour to devise measures to improve plant availability, based on the careful analysis of causes that reduce plant availability. The paper discusses the results of studies on the following items from such viewpoints: (1) Safety and operating experience of LWR nuclear power plants in Japan: operating experience with LWRs; improvements in LWR design during the past ten years; analysis of the factors affecting plant availability; (2) Assurance of safety and measures to increase availability: measures for safety and environmental protection; measures to reduce radiation exposure of employees; appropriateness of maintenance and inspection work; measures to increase plant availability; measures to improve reliability of equipment and components; (3) Future technical problems. (author)

  16. ATLAS Operations: Experience and Evolution in the Data Taking Era

    CERN Document Server

    Ueda, I; The ATLAS collaboration; Goossens, L; Stewart, G; Jezequel, S; Nairz, A; Negri, G; Campana, S; Di Girolamo, A

    2011-01-01

    This paper summarises the operational experience and improvements of the ATLAS hierarchical multi-tier computing infrastructure in the past year leading to taking and processing of the first collisions in 2009 and 2010. Special focus will be given to Tier-0 which is responsible, among other things, for a prompt processing of the raw data coming from the online DAQ system and is thus critical part of the chain. We will give an overview of the Tier-0 architecture, and improvements based on the operational experience. Emphasis will be put on the new developments, namely the Task Management System opening Tier-0 to expert users and Web 2.0 monitoring and management suite. We then overview the achieved performances with the distributed computing system, discuss observed data access patterns over the grid and describe how we used this information to improve analysis rates.

  17. ATLAS Operations: Experience and Evolution in the Data Taking Era

    International Nuclear Information System (INIS)

    Ueda, I

    2011-01-01

    This paper summarises the operational experience and improvements of the ATLAS hierarchical multi-tier computing infrastructure in the past year leading to taking and processing of the first collisions in 2009 and 2010. Special focus will be given to the Tier-0 which is responsible, among other things, for a prompt processing of the raw data coming from the online DAQ system and is thus a critical part of the chain. We will give an overview of the Tier-0 architecture, and improvements based on the operational experience. Emphasis will be put on the new developments, namely the Task Management System opening Tier-0 to expert users and Web 2.0 monitoring and management suite. We then overview the achieved performances with the distributed computing system, discuss observed data access patterns over the grid and describe how we used this information to improve analysis rates.

  18. Machine utilisation and operation experience with Jet from 1983

    International Nuclear Information System (INIS)

    Green, B.J.; Chuilon, P.; Noble, B.; Saunders, R.; Webberley, D.

    1989-01-01

    The operation of JET commenced in June 1983 and is scheduled until the end of 1992. This seemingly long period is actually quite limited when compared with the time needed to implement and commission the planned machine enhancements, and pursue research and developments which result from the experiments. There is an ever-present urgency to make the best use of the machine. 1983-84 was a learning period and only in 1985 was it felt worthwhile to adopt double-shift day working. Data has been compiled and analysed for utilisation of the machine, delays in terms of time lost and systems involved, and number and frequency of machine pulses. This paper presents an overall picture of machine availability and utilisation. It describes the JET operational arrangements and the experience of system faults. Finally, it draws conclusions and identifies lessons learned which may be relevant to the next stage of fusion power development

  19. Machine utilisation and operation experience with JET from 1983

    International Nuclear Information System (INIS)

    Green, B.J.; Chuilon, P.; Noble, B.; Saunders, R.; Webberley, D.

    1989-01-01

    The operation of JET commenced in June 1983 and is scheduled until the end of 1992. This seemingly long period is actually quite limited when compared with the time needed to implement and commission the planned machine enhancements, and pursue research and developments which result from the experiments. There is an ever-present urgency to make the use of the machine. 1983-84 was a learning period and only in 1985 was it felt worthwhile to adopt double-shift day working. Data has been compiled and analysed for utilisation of the machine, delays in terms of time lost and system involved, and number and frequency of machine pulses. This paper presents an overall picture of machine availability and utilisation. It describes the JET operational arrangements and the experience of system faults. Finally, it draws conclusions and identifies lessons learned which may be relevant to the next stage of fusion power development. (author). 9 figs

  20. The National Flood Interoperability Experiment: Bridging Resesarch and Operations

    Science.gov (United States)

    Salas, F. R.

    2015-12-01

    The National Weather Service's new National Water Center, located on the University of Alabama campus in Tuscaloosa, will become the nation's hub for comprehensive water resources forecasting. In conjunction with its federal partners the US Geological Survey, Army Corps of Engineers and Federal Emergency Management Agency, the National Weather Service will operationally support both short term flood prediction and long term seasonal forecasting of water resource conditions. By summer 2016, the National Water Center will begin evaluating four streamflow data products at the scale of the NHDPlus river reaches (approximately 2.67 million). In preparation for the release of these products, from September 2014 to August 2015, the National Weather Service partnered with the Consortium of Universities for the Advancement of Hydrologic Science, Inc. to support the National Flood Interoperability Experiment which included a seven week in-residence Summer Institute in Tuscaloosa for university students interested in learning about operational hydrology and flood forecasting. As part of the experiment, 15 hour forecasts from the operational High Resolution Rapid Refresh atmospheric model were used to drive a three kilometer Noah-MP land surface model loosely coupled to a RAPID river routing model operating on the NHDPlus dataset. This workflow was run every three hours during the Summer Institute and the results were made available to those engaged to pursue a range of research topics focused on flood forecasting (e.g. reservoir operations, ensemble forecasting, probabilistic flood inundation mapping, rainfall product evaluation etc.) Although the National Flood Interoperability Experiment was finite in length, it provided a platform through which the academic community could engage federal agencies and vice versa to narrow the gap between research and operations and demonstrate how state of the art research infrastructure, models, services, datasets etc. could be utilized

  1. Estimation of fire frequency from PWR operating experience

    International Nuclear Information System (INIS)

    Bertrand, R.; Bonneval, F.; Barrachin, G.; Bonino, F.

    1998-01-01

    In the framework of a fire probabilistic safety assessment (Fire PSA), the French Institute for Nuclear Safety and Protection (IPSN) has developed a method for estimating the frequency of fire in a nuclear power plant room. This method is based on the analysis of French Pressurized Water Reactors operating experience. The method adopted consists is carrying out an in-depth analysis of fire-related incidents. A database has been created including 202 fire events reported in 900 MWe and 1300 MWe reactors from the start of their commercial operation up to the first of March 1994, which represents a cumulated service life of 508 reactor-years. For each reported fire, several data were recorded among which: The operating state of the reactor in the stage preceding the fire, the building in which the fire broke out, the piece of equipment or the human intervention which caused the fire. Operating experience shows that most fires are initiated by electrical problems (short-circuits, arcing, faulty contacts, etc.) and that human intervention also plays an important role (grinding, cutting, welding, cleaning, etc.). A list of equipment and of human interventions which proved to be possible fire sources was therefore drawn up. the items of this list were distributed in 19 reference groups defined by taking into account the nature of the potential ignition source (transformers, electrical cabinets, pumps, fans, etc.). The fire frequency assigned to each reference group was figured out using the operating experience information of the database. The fire frequency in a room is considered to be made out of two contributions: one due to equipment which is proportional to the number of pieces of equipment from each reference group contained in the room, and a second one which is due to human interventions and assumed to be uniform throughout the reactor. Formulas to assess the fire frequencies in a room, the reactor being in a shutdown state or at power, are then proposed

  2. Summary of operating experience at Swedish nuclear power plants in 1984

    International Nuclear Information System (INIS)

    1985-01-01

    The four owners on nuclear power plants in Sweden - The Swedish State Power Board, Forsmarks Kraftgrupp AB, Sydkraft AB and OKG AKTIEBOLAG - formed in 1980 the Nuclear Safety Board of the Swedish Utilities as a joint body for collaboration in safety matters. The Board participates in coordination of the safety work of the utilities and conducts its own safety projects, whereever this is more efficient than the utilities' working independently. The work of the Board shall contribute to optimizing safety in the operation of the Swedish nuclear power plants. The most important function of the Board is to collect, process and evaluate information on operational disturbances and incidents at Swedish and foreign nuclear power plants and then use the knowledge thus gained to improve the safety of the operation of the Swedish nuclear power plants (experience feedback). The work with Experience Feedback proceeds in three stages: Event follow-up, Fault analysis and Feedback of results. The Board runs a system for experience feedback (ERF). ERF is a computer-based information and communication system. ERF provides the Board with a daily update of operating experience in both Swedish and foreign nuclear power plants. Each Swedish nuclear power station supplies the ERF system with data on, among other things, operation and operational distrubances. Important experiences are thereby fed back to plant operation. Experience from foreign nuclear power stations can be of interest to the Swedish nuclear power plants. This information comes to RKS and is reviewed daily. The information that is considered relevant to Swedish plants is fed after analysis into the ERF system. Conversely, foreign nuclear power stations can obtain information from the operation of the Swedish plants. (author)

  3. Evaluation of operating experience for service life of components

    International Nuclear Information System (INIS)

    Schulz, H.; Sunder, R.

    1987-01-01

    The evaluation of the operating experience of German light-water reactor components based on licensee event reports indicates that a large part of the defects and failures are caused by fatigue and/or corrosion type mechanisms. Actions have been taken to eliminate the causes by redesigning systems, replacement of components and change of operating procedures. The interaction of fatigue and corrosion mechanisms are not understood in all details today, further research is still necessary. To establish a more realistic data base of the local loading and water chemistry condition for all loading conditions the application of advanced monitoring systems is proposed. The benefits of these systems are that the operating procedures can be further optimized, the actual used life time fraction can be calculated regularly and the data base can be used for life time extension. (orig.) [de

  4. Operational experience gained from the Central Brae subsea field

    International Nuclear Information System (INIS)

    Sapp, S.J.; Gomersall, S.D.

    1994-01-01

    The size of the field discoveries made in the North Sea in recent years has declined dramatically. With the low oil price many small fields are not viable stand alone developments. The North Sea has a large, well developed infrastructure of production facilities and pipelines. With many platforms now operating below optimum production rate, subsea tieback of these small fields utilizing the available processing capacity is the most economically attractive means of development. This paper presents a history of such a field development. The Central Brae field is located within the Brae complex of fields, 155 miles north east of Aberdeen, and has been developed by means of a subsea facility tied back to the Brae Alpha platform. A great deal of experience has been gained through the field development, not only in subsea operations but also in completion and template design and operating philosophy

  5. Operational Experience with the ATLAS Pixel Detector at the LHC

    CERN Document Server

    Keil, M; The ATLAS collaboration

    2012-01-01

    The ATLAS Pixel Detector is the innermost detector of the ATLAS experiment at the Large Hadron Collider at CERN, providing high-resolution measurements of charged particle tracks in the high radiation environment close to the collision region. This capability is vital for the identification and measurement of proper decay times of long-lived particles such as b-hadrons, and thus vital for the ATLAS physics program. The detector provides hermetic coverage with three cylindrical layers and three layers of forward and backward pixel detectors. It consists of approximately 80 million pixels that are individually read out via chips bump-bonded to 1744 n-in-n silicon substrates. In this talk, results from the successful operation of the Pixel Detector at the LHC and its status after three years of operation will be presented, including calibration procedures, timing optimization and detector performance. The detector performance is excellent: ~96 % of the pixels are operational, noise occupancy and hit efficiency e...

  6. Wabash River coal gasification repowering project -- first year operation experience

    Energy Technology Data Exchange (ETDEWEB)

    Troxclair, E.J. [Destec Energy, Inc., Houston, TX (United States); Stultz, J. [PSI Energy, Inc., West Terre Haute, IN (United States)

    1997-12-31

    The Wabash River Coal Gasification Repowering Project (WRCGRP), a joint venture between Destec Energy, Inc. and PSI Energy, Inc., began commercial operation in November of 1995. The Project, selected by the United States Department of Energy (DOE) under the Clean Coal Program (Round IV) represents the largest operating coal gasification combined cycle plant in the world. This Demonstration Project has allowed PSI Energy to repower a 1950`s vintage steam turbine and install a new syngas fired combustion turbine to provide 262 MW (net) of electricity in a clean, efficient manner in a commercial utility setting while utilizing locally mined high sulfur Indiana bituminous coal. In doing so, the Project is also demonstrating some novel technology while advancing the commercialization of integrated coal gasification combined cycle technology. This paper discusses the first year operation experience of the Wabash Project, focusing on the progress towards achievement of the demonstration objectives.

  7. Experience building and operating the CMS Tier-1 computing centres

    Science.gov (United States)

    Albert, M.; Bakken, J.; Bonacorsi, D.; Brew, C.; Charlot, C.; Huang, Chih-Hao; Colling, D.; Dumitrescu, C.; Fagan, D.; Fassi, F.; Fisk, I.; Flix, J.; Giacchetti, L.; Gomez-Ceballos, G.; Gowdy, S.; Grandi, C.; Gutsche, O.; Hahn, K.; Holzman, B.; Jackson, J.; Kreuzer, P.; Kuo, C. M.; Mason, D.; Pukhaeva, N.; Qin, G.; Quast, G.; Rossman, P.; Sartirana, A.; Scheurer, A.; Schott, G.; Shih, J.; Tader, P.; Thompson, R.; Tiradani, A.; Trunov, A.

    2010-04-01

    The CMS Collaboration relies on 7 globally distributed Tier-1 computing centres located at large universities and national laboratories for a second custodial copy of the CMS RAW data and primary copy of the simulated data, data serving capacity to Tier-2 centres for analysis, and the bulk of the reprocessing and event selection capacity in the experiment. The Tier-1 sites have a challenging role in CMS because they are expected to ingest and archive data from both CERN and regional Tier-2 centres, while they export data to a global mesh of Tier-2s at rates comparable to the raw export data rate from CERN. The combined capacity of the Tier-1 centres is more than twice the resources located at CERN and efficiently utilizing this large distributed resources represents a challenge. In this article we will discuss the experience building, operating, and utilizing the CMS Tier-1 computing centres. We will summarize the facility challenges at the Tier-1s including the stable operations of CMS services, the ability to scale to large numbers of processing requests and large volumes of data, and the ability to provide custodial storage and high performance data serving. We will also present the operations experience utilizing the distributed Tier-1 centres from a distance: transferring data, submitting data serving requests, and submitting batch processing requests.

  8. Experience building and operating the CMS Tier-1 computing centres

    International Nuclear Information System (INIS)

    Albert, M; Bakken, J; Huang, Chih-Hao; Dumitrescu, C; Fagan, D; Fisk, I; Giacchetti, L; Gutsche, O; Holzman, B; Bonacorsi, D; Grandi, C; Brew, C; Jackson, J; Charlot, C; Colling, D; Fassi, F; Flix, J; Gomez-Ceballos, G; Hahn, K; Gowdy, S

    2010-01-01

    The CMS Collaboration relies on 7 globally distributed Tier-1 computing centres located at large universities and national laboratories for a second custodial copy of the CMS RAW data and primary copy of the simulated data, data serving capacity to Tier-2 centres for analysis, and the bulk of the reprocessing and event selection capacity in the experiment. The Tier-1 sites have a challenging role in CMS because they are expected to ingest and archive data from both CERN and regional Tier-2 centres, while they export data to a global mesh of Tier-2s at rates comparable to the raw export data rate from CERN. The combined capacity of the Tier-1 centres is more than twice the resources located at CERN and efficiently utilizing this large distributed resources represents a challenge. In this article we will discuss the experience building, operating, and utilizing the CMS Tier-1 computing centres. We will summarize the facility challenges at the Tier-1s including the stable operations of CMS services, the ability to scale to large numbers of processing requests and large volumes of data, and the ability to provide custodial storage and high performance data serving. We will also present the operations experience utilizing the distributed Tier-1 centres from a distance: transferring data, submitting data serving requests, and submitting batch processing requests.

  9. Operating Experience at the Aagesta Nuclear Power Station

    International Nuclear Information System (INIS)

    Sandstroem, S.

    1966-09-01

    Sweden's first nuclear power reactor Agesta, achieved criticality on July 17, 1963. Full power (65 MW t ) was attained on March 20, 1964. Aagesta is a heavy water cooled and moderated pressure vessel reactor used for production of electricity as well as for district heating. The design, assembly and construction etc, of the reactor was described in detail in a staff report by AB Atomenergi, 'The Aagesta Nuclear Power Station' edited by B McHugh, which was published in September, 1964. In the book experiences from the commissioning and the first operation of the reactor were reported as well as findings from the extensive reactor physics studies made during this period. The report now presented is written by members of the operating team at Aagesta since its start. It reflects in general the experiences up to the end of 1965. The Aagesta Log, however, covers the period up to the normal summer stop 1966. The reactor has hitherto produced 506,000 MWh power of which 48,700 MWh have been electric power. In July 1965 the responsibility for the reactor operation was taken over by the Swedish State Power Board from AB Atomenergi, which company had started the reactor and operated it until the summer break 1965

  10. Operating Experience at the Aagesta Nuclear Power Station

    Energy Technology Data Exchange (ETDEWEB)

    Sandstroem, S [ed.

    1966-09-15

    Sweden's first nuclear power reactor Agesta, achieved criticality on July 17, 1963. Full power (65 MW{sub t}) was attained on March 20, 1964. Aagesta is a heavy water cooled and moderated pressure vessel reactor used for production of electricity as well as for district heating. The design, assembly and construction etc, of the reactor was described in detail in a staff report by AB Atomenergi, 'The Aagesta Nuclear Power Station' edited by B McHugh, which was published in September, 1964. In the book experiences from the commissioning and the first operation of the reactor were reported as well as findings from the extensive reactor physics studies made during this period. The report now presented is written by members of the operating team at Aagesta since its start. It reflects in general the experiences up to the end of 1965. The Aagesta Log, however, covers the period up to the normal summer stop 1966. The reactor has hitherto produced 506,000 MWh power of which 48,700 MWh have been electric power. In July 1965 the responsibility for the reactor operation was taken over by the Swedish State Power Board from AB Atomenergi, which company had started the reactor and operated it until the summer break 1965.

  11. Operating Experience at the Aagesta Nuclear Power Station

    Energy Technology Data Exchange (ETDEWEB)

    Sandstroem, S. (ed.)

    1966-09-15

    Sweden's first nuclear power reactor Agesta, achieved criticality on July 17, 1963. Full power (65 MW{sub t}) was attained on March 20, 1964. Aagesta is a heavy water cooled and moderated pressure vessel reactor used for production of electricity as well as for district heating. The design, assembly and construction etc, of the reactor was described in detail in a staff report by AB Atomenergi, 'The Aagesta Nuclear Power Station' edited by B McHugh, which was published in September, 1964. In the book experiences from the commissioning and the first operation of the reactor were reported as well as findings from the extensive reactor physics studies made during this period. The report now presented is written by members of the operating team at Aagesta since its start. It reflects in general the experiences up to the end of 1965. The Aagesta Log, however, covers the period up to the normal summer stop 1966. The reactor has hitherto produced 506,000 MWh power of which 48,700 MWh have been electric power. In July 1965 the responsibility for the reactor operation was taken over by the Swedish State Power Board from AB Atomenergi, which company had started the reactor and operated it until the summer break 1965.

  12. Operating results and experience and operating regimes in changing demands of energy world

    International Nuclear Information System (INIS)

    Hobza, L.

    2004-01-01

    In this paper, there are stated some operating results and experience obtained from trial operation of Temelin NPP. In Europe, Temelin NPP is presently one of the latest implemented projects of the series of VVER 1000 nuclear units with proven V-320 pressurized water reactor. The distinction between Temelin NPP and original project lays mainly in supply of nuclear fuel and in I and C systems delivered by Westinghouse Company. Temelin NPP has passed through commissioning period and trial operation. The main goal of the trial operation was to meet the requirements of section 2, par. 4, point b) of Decree No. 106/98 Sb. and verification of project parameters and stability of operation, and the situation leading to violation of safety functions fulfilment according to Pre-operational Safety Report should not occur. The integral part of trial operation assessment was also successful performing of determined monitoring programmes, first refuelling and performing of prescribed tests and operational inspections. Simultaneously, first experience was obtained with nuclear fuel; providing of ancillary services; reliability of important components; operation of turbine-generator 1000 MW; chemical regime; influence to environment; and quality of contractors. As safety is the most important indicator, it can be stated that: no facts which would lead to decreasing of safety systems operability have been detected; no facts which would lead to negative affecting of barriers against fading the radioactivity into both working areas and environment, have been detected; good condition of fire safety has been continuously documented; requirements of limits for releasing waste water into environment have been continuously complied with; requirements of limits for releasing radioactive substances (in gaseous and/or liquid state) into environment have been continuously complied with. From the operation regimes point of view is clear, that it would be suitable for the power plant if the

  13. The work of the Operational Safety Review Team (OSART)

    International Nuclear Information System (INIS)

    Hide, K.W.

    1996-01-01

    The Operational Safety Review Team (OSART) programme was set up by the IAEA in 1982 to assist Member States to enhance the operational safety of nuclear power plants. Each team is staffed by senior experts in the relevant fields. The review team discusses with plant staff the existing operational programmes for plant which may be under construction, being commissioned or already operating. Following a detailed examination of a safety programme, the OSART team lists strengths and weaknesses and makes recommendations on how to overcome the latter. Since their conclusions are based on the best prevailing international practice, they may be more stringent than those based on national criteria. The results of the 77 missions conducted at 62 plants in 28 countries by the end of 1994 are summarised. (UK)

  14. Experience on operational safety improvement of control and operation support systems

    International Nuclear Information System (INIS)

    Itoh, N.; Nakagawa, T.; Mano, K.

    1988-01-01

    Japanese nuclear industry started in 1956 and about 30 years have passed since that time. Through these years, we have made a lot of efforts and developments in the field of Control and Instrumentation (C and I) system. The above 30 years and following years can be divided into four major periods. The first one is the period of research, the second of domestic production, the third of improvement, and the fourth of advancement. Improvements of C and I system, which we have made in those periods have made a great contribution to enhancement of reliability, availability and operability of nuclear power plants. Fig. 1 shows TEPCO's nuclear power plant (BWR) construction experience and technical trend of C and I system in Japan. This paper is to introduce the efforts and operational experience on control and operation support systems

  15. Operating Experience Report: Counterfeit, Suspect and Fraudulent Items. Working Group on Operating Experience. Proceedings and Analysis on an Item of Generic Interest

    International Nuclear Information System (INIS)

    2011-01-01

    recent information and to utilise the international group of experts to gather information to enhance their national efforts. In order to gain a better understanding of the situation in WGOE member country regarding this matter, a questionnaire was developed by the United States delegate together with the NRC (USA Regulatory body) lead for CSFI. This questionnaire was forwarded to the WGOE members in August of 2010. At the September 2010 WGOE meeting, the US delegate provided an introductory CSFI presentation. This presentation was followed by two other CSFI presentations. The acronym CSFI (Counterfeit, Suspect, and Fraudulent Items) and CFSI (Counterfeit, Fraudulent, Suspect Items) are interchangeable in meaning. However, the order has changed in some countries as the issue has evolved. The report provides the proceedings from the WGOE meeting discussion on the item of generic interest from September 2010. Additionally, this report aims to analyse the WGOE member country responses to the CSFI questionnaire and develop conclusions and recommendations on this generic issue. Its scope covers the compilation and review of the information provided in the meeting and by the WGOE members. It intends to be a starting point to deal with CFSI in the international operating experience arena

  16. Operating System Concepts for Reconfigurable Computing: Review and Survey

    OpenAIRE

    Marcel Eckert; Dominik Meyer; Jan Haase; Bernd Klauer

    2016-01-01

    One of the key future challenges for reconfigurable computing is to enable higher design productivity and a more easy way to use reconfigurable computing systems for users that are unfamiliar with the underlying concepts. One way of doing this is to provide standardization and abstraction, usually supported and enforced by an operating system. This article gives historical review and a summary on ideas and key concepts to include reconfigurable computing aspects in operating systems. The arti...

  17. Evaluation of operating experience for early recognition of deteriorating safety performance

    International Nuclear Information System (INIS)

    Beckmerhagen, I.A.; Berg, H.P.

    2004-01-01

    One of the most difficult challenges facing nuclear power plants is to recognize the early signs of degrading safety performance before regulatory requirements are imposed or serious incidents or accidents occur. Today, the nuclear industry is striving for collecting more information on occurrences that could improve the operational safety performance. To achieve this, the reporting threshold has been lowered from incidents to anomalies with minor or no impact to safety. Industry experience (also outside nuclear industry) has shown that these are typical issues which should be considered when looking for such early warning signs. Therefore, it is important that nuclear power plant operators have the capability to trend, analyse and recognize early warning signs of deteriorating performance. It is necessary that plant operators are sensitive to these warning signs which may not be immediately evident. Reviewing operating experience is one of the main tasks for plant operators in their daily activities. Therefore, self assessment should be at the centre of any operational safety performance programme. One way of applying a self assessment program is through the following four basic elements: operational data, events, safety basis, and related experience. This approach will be described in the paper in more details. (authors)

  18. Quality assurance of pre-operative assessment--a review of quality assurance activities related to pre-operative assessment in nine hospitals in The Netherlands

    NARCIS (Netherlands)

    Klazinga, N. S.; Helsloot, R.

    1989-01-01

    Pre-operative assessment of patients for surgery is one of the most prevalent topics for quality assurance by peer-review in Dutch hospitals. This article describes the experiences with pre-operative assessment in nine hospitals. It is discussed why preoperative assessment is performed, what tests

  19. Installation and first operation of the negative ion optimization experiment

    International Nuclear Information System (INIS)

    De Muri, Michela; Cavenago, Marco; Serianni, Gianluigi; Veltri, Pierluigi; Bigi, Marco; Pasqualotto, Roberto; Barbisan, Marco; Recchia, Mauro; Zaniol, Barbara; Kulevoy, Timour; Petrenko, Sergey; Baseggio, Lucio; Cervaro, Vannino; Agostini, Fabio Degli; Franchin, Luca; Laterza, Bruno; Minarello, Alessandro; Rossetto, Federico; Sattin, Manuele; Zucchetti, Simone

    2015-01-01

    Highlights: • Negative ion sources are key components of the neutral beam injectors. • The NIO1 experiment is a RF ion source, 60 kV–135 mA hydrogen negative ion beam. • NIO1 can contribute to beam extraction and optics thanks to quick replacement and upgrading of parts. • This work presents installation, status and first experiments results of NIO1. - Abstract: Negative ion sources are key components of the neutral beam injectors for thermonuclear fusion experiments. The NIO1 experiment is a radio frequency ion source generating a 60 kV–135 mA hydrogen negative ion beam. The beam is composed of nine beamlets over an area of about 40 × 40 mm"2. This experiment is jointly developed by Consorzio RFX and INFN-LNL, with the purpose of providing and optimizing a test ion source, capable of working in continuous mode and in conditions similar to those foreseen for the larger ion sources of the ITER neutral beam injectors. At present research and development activities on these ion sources still address several important issues related to beam extraction and optics optimization, to which the NIO1 test facility can contribute thanks to its modular design, which allows for quick replacement and upgrading of components. This contribution presents the installation phases, the status of the test facility and the results of the first experiments, which have demonstrated that the source can operate in continuous mode.

  20. Operations and Maintenance Cost for Stratified Buildings: A Critical Review

    Directory of Open Access Journals (Sweden)

    Che-Ghani Nor Zaimah

    2016-01-01

    Full Text Available Building maintenance is essential in preserving buildings’ appearance and performance. It needs to upkeep the building performance to prolong its value and building life cycle. Malaysia is still lacking in managing cost for building operation and maintenance. It has been found that the cost for housing maintenance is high due to poor maintenance practices. In order to get better understanding on how to manage the cost, this study reviews the contributing factors that affecting operation and maintenance cost of stratified buildings in Malaysia. The research first identified the factors through extensive literature review and scrutinize on factors that affecting and can minimize operation and maintenance cost. This literature review offers insight into building maintenance scenario in Malaysia focusing on the issues and challenges. The study also finds that operation and maintenance cost for housing in Malaysia is still in poor state. Interestingly, this paper revealed that operation and maintenance cost is also influenced by three significant factors like expectation of tenants, building characteristics and building defects. Measures to reduce the housing operation and maintenance cost are also highlighted so that this study can be a stepping stone towards proposing efficient and effective facilities management strategies for affordable housing in future.

  1. Aging of nuclear station diesel generators: Evaluation of operating and expert experience: Phase 1, Study

    International Nuclear Information System (INIS)

    Hoopingarner, K.R.; Vause, J.W.; Dingee, D.A.; Nesbitt, J.F.

    1987-08-01

    Pacific Northwest Laboratory evaluated operational and expert experience pertaining to the aging degradation of diesel generators in nuclear service. The research, sponsored by the US Nuclear Regulatory Commission (NRC), identified and characterized the contribution of aging to emergency diesel generator failures. This report, Volume I, reviews diesel-generator experience to identify the systems and components most subject to aging degradation and isolates the major causes of failure that may affect future operational readiness. Evaluations show that as plants age, the percent of aging-related failures increases and failure modes change. A compilation is presented of recommended corrective actions for the failures identified. This study also includes a review of current, relevant industry programs, research, and standards. Volume II reports the results of an industry-wide workshop held on May 28 and 29, 1986 to discuss the technical issues associated with aging of nuclear service emergency diesel generators

  2. Operating experience feedback report -- turbine-generator overspeed protection systems: Commercial power reactors. Volume 11

    International Nuclear Information System (INIS)

    Ornstein, H.L.

    1995-04-01

    This report presents the results of the US Nuclear Regulatory Commission's Office for Analysis and Evaluation of Operational Data (AEOD) review of operating experience of main turbine-generator overspeed and overspeed protection systems. It includes an indepth examination of the turbine overspeed event which occurred on November 9, 1991, at the Salem Unit 2 Nuclear Power Plant. It also provides information concerning actions taken by other utilities and the turbine manufacturers as a result of the Salem overspeed event. AEOD's study reviewed operating procedures and plant practices. It noted differences between turbine manufacturer designs and recommendations for operations, maintenance, and testing, and also identified significant variations in the manner that individual plants maintain and test their turbine overspeed protection systems. AEOD's study provides insight into the shortcomings in the design, operation, maintenance, testing, and human factors associated with turbine overspeed protection systems. Operating experience indicates that the frequency of turbine overspeed events is higher than previously thought and that the bases for demonstrating compliance with NRC's General Design Criterion (GDC) 4, Environmental and dynamic effects design bases, may be nonconservative with respect to the assumed frequency

  3. Experience with dose limitation during preparations for sea dumping operations

    International Nuclear Information System (INIS)

    Fieuw, G.; Voorde, N. van de; Baekelandt, L.

    1982-01-01

    Since 1967 low-level radioactive wastes from operational nuclear facilities in Belgium have been dumped into the sea. The dumping is carried out in accordance with the recommendations issued by the IAEA under the London Convention. All these dumping operations have taken place under the surveillance of the Nuclear Energy Agency of the OECD. To limit the doses received by workers and the public during the various phases leading up to sea dumping, appropriate measures are required in connection with waste treatment and packaging, limitation of radiation levels, storage and handling, organization and selection of the means of transport and organization and means of monitoring. Although treatment and handling at the nuclear sites are entrusted to occupationally exposed workers, temporary labour is used for the transport and handling operations. Effective treatment and packaging reduce the risk of internal exposure to a negligible value. Meticulous planning and permanent personnel monitoring reduce the doses received by the workers to acceptable values not exceeding the statutory dose limits. The doses received by personnel involved in the preparations for sea dumping operations from 1967 to 1980 are given and a relationship is established between these doses and the activities handled. Experience shows that sea dumping operations do not entail unacceptable risks either for the workers concerned or for the population and allows us to optimize the methods used for loading, handling and transport. (author)

  4. Human-centred automation programme: review of experiment related studies

    International Nuclear Information System (INIS)

    Grimstad, Tone; Andresen, Gisle; Skjerve, Ann Britt Miberg

    2000-04-01

    Twenty-three empirical studies concerning automation and performance have been reviewed. The purposes of the review are to support experimental studies in the Human-Centred Automation (HCA) programme and to develop a general theory on HCA. Each study was reviewed with regard to twelve study characteristics: domain, type of study, purpose, definition of automation, variables, theoretical basis, models of operator performance, methods applied, experimental design, outcome, stated scope of results, strengths and limitations. Seven of the studies involved domain experts, the rest used students as participants. The majority of the articles originated from the aviation domain: only the study conducted in HAMMLAB considered process control in power plants. In the experimental studies, the independent variable was level of automation, or reliability of automation, while the most common dependent variables were workload, situation awareness, complacency, trust, and criteria of performance, e.g., number of correct responses or response time. Although the studies highlight important aspects of human-automation interaction, it is still unclear how system performance is affected. Nevertheless, the fact that many factors seem to be involved is taken as support for the system-oriented approach of the HCA programme. In conclusion, the review provides valuable input both to the design of experiments and to the development of a general theory. (Author). refs

  5. Evolution of PHWR fuel transfer system based on operating experience

    International Nuclear Information System (INIS)

    Parvatikar, R.S.; Singh, Jaipal; Chaturvedi, P.C.; Bhambra, H.S.

    2006-01-01

    Fuel Transfer System facilitates loading of new fuel into Fuelling Machine, receipt of spent fuel from Fuelling Machine and its further transportation to Storage Bay. To overcome the limitations of transferring a pair of bundles in the single tube Airlock and Transfer Arm in RAPS-1 and 2/MAPS, a new concept of six tube Transfer Magazine was introduced in NAPS. This resulted in simultaneous loading of new fuel from Transfer Magazine into the Fuelling Machine and unloading of spent fuel from the Fuelling Machine through the exchange mode. It further facilitated the parallel/simultaneous operation of refuelling by Fuelling Machines on the reactor and transferring of spent fuel bundles from the Transfer Magazine to the bay. This new design of Fuel Transfer System was adopted for all standardised 220 MWe PHWRs. Based on the experience gained in 220 MWe PHWRs in the area of operation and maintenance, a number of improvements have been carried out over the years. These aspects have been further strengthened and refined in the Fuel Transfer System of 540 MWe units. The operating experience of the system indicates that the presence of heavy water in the Transfer Magazine poses limitations in its maintenance in the Fuel Transfer room. Further, Surveillance and maintenance of large number of under water equipment and associated valves, rams and underwater sensors is putting extra burden on the O and M efforts. A new concept of mobile light water filled Transfer Machine has been evolved for proposed 700 MWe PHWR units to simplify Fuel Transfer System. This has been made possible by adopting snout level control in the Fuelling Machine, elimination of Shuttle Transport System and locating the Storage Bay adjacent to the Reactor Building. This paper describes the evolution of Fuel Transfer System concepts and various improvements based on the experience gained in the operation and maintenance of the system. (author)

  6. Nasopharyngeal angiofibroma: Our experience and literature review

    Science.gov (United States)

    Martins, Mariane Barreto Brandão; de Lima, Francis Vinicius Fontes; Mendonça, Carlos Alberto; de Jesus, Eduardo Passos Fiel; Santos, Arlete Cristina Granizo; Barreto, Valéria Maria Prado; Santos, Ronaldo Carvalho

    2013-01-01

    Summary Introduction: Juvenile nasopharyngeal angiofibroma is a rare, highly vascular, and histologically benign tumor, generally observed in male adolescents. It shows very aggressive behavior due to local invasiveness and is associated with various symptoms. Juvenile nasopharyngeal angiofibroma originates in the sphenopalatine forame, causing epistaxes and nasal obstruction. Objective: To retrospectively describe our experience in the diagnosis and treatment of patients with juvenile nasopharyngeal angiofibroma. Scientific drawing: Retrospective, descriptive study conducted after approval from the Ethics Committee of the Federal University of Sergipe (protocol 0114.0.107.000 -11). Methods: We analyzed findings in 20 patients who underwent surgery between 2004 and 2011. Factors analyzed include patient age and gender, symptoms, stages, treatment, length of surgery, intraoperatory bleeding, postoperative need for nasal tampons, hospitalization time, complications, and tumor recurrence. Results: Patients were aged 10–29 years. All patients were treated surgically, including 17 who underwent endoscopic surgery. The mean operation time was 120 min, and the mean bleeding volume was 300 mL. Seventeen patients required clamping of the external carotids and tumor embolization. Conclusion: Endoscopic surgery alone or with other conventional techniques was safe for the treatment of angiofibromas of different stages. PMID:25991988

  7. Nasopharyngeal angiofibroma: Our experience and literature review

    Directory of Open Access Journals (Sweden)

    Santos Júnior, Ronaldo Carvalho

    2013-01-01

    Full Text Available Introduction: Juvenile nasopharyngeal angiofibroma is a rare, highly vascular, and histologically benign tumor, generally observed in male adolescents. It shows very aggressive behavior due to local invasiveness and is associated with various symptoms. Juvenile nasopharyngeal angiofibroma originates in the sphenopalatine forame, causing epistaxes and nasal obstruction. Objective: To retrospectively describe our experience in the diagnosis and treatment of patients with juvenile nasopharyngeal angiofibroma. Scientific drawing: Retrospective, descriptive study conducted after approval from the Ethics Committee of the Federal University of Sergipe (protocol 0114.0.107.000 -11. Methods: We analyzed findings in 20 patients who underwent surgery between 2004 and 2011. Factors analyzed include patient age and gender, symptoms, stages, treatment, length of surgery, intraoperatory bleeding, postoperative need for nasal tampons, hospitalization time, complications, and tumor recurrence. Results: Patients were aged 10-29 years. All patients were treated surgically, including 17 who underwent endoscopic surgery. The mean operation time was 120 min, and the mean bleeding volume was 300 mL. Seventeen patients required clamping of the external carotids and tumor embolization. Conclusion: Endoscopic surgery alone or with other conventional techniques was safe for the treatment of angiofibromas of different stages.

  8. Safety related experience in FFTF startup and operation

    International Nuclear Information System (INIS)

    Peterson, R.E.; Halverson, T.G.; Daughtry, J.W.

    1982-06-01

    The Fast Flux Test Facility (FFTF) is a 400 MW(t) sodium cooled fast reactor operating at the Hanford Engineering Development Laboratory, Richland, Washington, to conduct fuels and materials testing in support of the US LMFBR program. Startup and initial power ascension testing of the facility involved a comprehensive series of readiness reviews and acceptance tests, many of which relate to the inherent safety of the plant. Included are physics measurements, natural circulation, integrated containment leakage, shielding effectiveness, fuel failure detection, and plant protection system tests. Described are the measurements taken to confirm the design safety margins upon which the operating authorization of the plant was based. These measurements demonstrate that large margins of safety are available in the FFTF design

  9. Licensing Support Experience of the BN-600 Operation

    International Nuclear Information System (INIS)

    Khrennikov, N.; Sintsov, A.

    2013-01-01

    License procedure - Main principle: • All works, including fatigue tests of new types of fuel, are carried out at the unit 3 Beloyarsk nuclear power plants with the BN-600 reactor with the justification of the regulatory body. • Justification procedure is standard for all power units and independent from the reactor types. • The regulatory body and independent experts or technical support organizations, which can be involved in this work by the regulatory body, review SAR, operational manuals and other operator documents. • Safety requirements (i.e. Federal rules and codes). The project and design documents shall meet safety requirements. • The technical and organizational measures for safety guarantee shall meet well-known results of the research investigations or shall be experimental validate

  10. A Practical Review of Studies on Operator's Supervisory Monitoring Behavior

    International Nuclear Information System (INIS)

    Ha, Jun Su; Seong, Poong Hyun

    2009-01-01

    Correct situation awareness (SA) has been considered a crucial key to improving performance and reducing error in NPPs. There are a lot of information sources that should be monitored in NPPs, but operators have only limited capacity of attention and memory. Operators in NPPs selectively attend to important information sources to effectively develop SA when an abnormal or accidental situation occurs. Selective attention to important information sources is continued while maintaining SA as well. In this work, various models of operator's visual sampling behavior are reviewed for the use in human factors studies in NPPs

  11. Review on Islanding Operation of Distribution System with Distributed Generation

    DEFF Research Database (Denmark)

    Mahat, Pukar; Chen, Zhe; Bak-Jensen, Birgitte

    2011-01-01

    The growing environmental concern and various benefits of distributed generation (DG) have resulted in significant penetration of DG in many distribution systems worldwide. One of the major expected benefits of DG is the improvement in the reliability of power supply by supplying load during power...... outage by operating in an island mode. However, there are many challenges to overcome before islanding operation of a distribution system with DG can become a viable solution in future. This paper reviews some of the major challenges with islanding operation and explores some possible solutions...

  12. Physics operating experience and fuel management of RAPS-1

    International Nuclear Information System (INIS)

    Nakra, A.N.; Purandare, H.D.; Srinivasan, K.R.; Rastogi, B.P.

    1976-01-01

    Rajasthan Atomic Power Station Unit-1 achieved criticality on August 11, 1972. Thereafter the reactor was brought to power, in November, 1972. Due to non-availability of the depleted fuel, the loading of which was necessary to obtain full power to begin with, the core was loaded with all natural uranium fuel and only 70% of the full power could be achieved. During the reactor operation for the last three years, the reactor has seen more than one effective full power year and about 1400 fresh fuel bundles have been loaded in the core. The reactor was subjected to about 150 power cycles resulting in more than 30% variation in operating power level and about 10 fuel bundles have failed. For satisfactory fuel management and refuelling decisions, a three dimensional simulator TRIVENI was developed. This was extensively tested during the start-up experiments and was found to be a satisfactory tool for day to day operation of the plant. In this paper, a brief account of analysis of the start-up experiments, approach to full power, power distortions and flux peaking, fuel management service and analysis of the failed fuel data has been given. (author)

  13. Variable Operative Experience in Hand Surgery for Plastic Surgery Residents.

    Science.gov (United States)

    Silvestre, Jason; Lin, Ines C; Levin, Lawrence Scott; Chang, Benjamin

    Efforts to standardize hand surgery training during plastic surgery residency remain challenging. We analyze the variability of operative hand experience at U.S. plastic surgery residency programs. Operative case logs of chief residents in accredited U.S. plastic surgery residency programs were analyzed (2011-2015). Trends in fold differences of hand surgery case volume between the 10th and 90th percentiles of residents were assessed graphically. Percentile data were used to calculate the number of residents achieving case minimums in hand surgery for 2015. Case logs from 818 plastic surgery residents were analyzed of which a minority were from integrated (35.7%) versus independent/combined (64.3%) residents. Trend analysis of fold differences in case volume demonstrated decreasing variability among procedure categories over time. By 2015, fold differences for hand reconstruction, tendon cases, nerve cases, arthroplasty/arthrodesis, amputation, arterial repair, Dupuytren release, and neoplasm cases were below 10-fold. Congenital deformity cases among independent/combined residents was the sole category that exceeded 10-fold by 2015. Percentile data suggested that approximately 10% of independent/combined residents did not meet case minimums for arterial repair and congenital deformity in 2015. Variable operative experience during plastic surgery residency may limit adequate exposure to hand surgery for certain residents. Future studies should establish empiric case minimums for plastic surgery residents to ensure hand surgery competency upon graduation. Copyright © 2017 Association of Program Directors in Surgery. Published by Elsevier Inc. All rights reserved.

  14. Receiver Operating Characteristics (ROCs) in Recognition Memory: A Review

    Science.gov (United States)

    Yonelinas, Andrew P.; Parks, Colleen M.

    2007-01-01

    Receiver operating characteristic (ROC) analysis is being used increasingly to examine the memory processes underlying recognition memory. The authors discuss the methodological issues involved in conducting and analyzing ROC results, describe the various models that have been developed to account for these results, review the behavioral empirical…

  15. Operational readiness reviews for restart of L reactor

    International Nuclear Information System (INIS)

    Finley, R.H.

    1984-01-01

    The L Reactor at the Savannah River Plant is being restarted after being in a standby status since 1968. Operational Readiness Reviews (ORRs) were conducted by DOE-SR and contractor personnel concurrent with the restart activity. This paper summarizes the ORR activity

  16. Plant operator performance evaluation based on cognitive process analysis experiment

    International Nuclear Information System (INIS)

    Ujita, H.; Fukuda, M.

    1990-01-01

    This paper reports on an experiment to clarify plant operators' cognitive processes that has been performed, to improve the man-machine interface which supports their diagnoses and decisions. The cognitive processes under abnormal conditions were evaluated by protocol analyses interviews, etc. in the experiment using a plant training simulator. A cognitive process model is represented by a stochastic network, based on Rasmussen's decision making model. Each node of the network corresponds to an element of the cognitive process, such as observation, interpretation, execution, etc. Some observations were obtained as follows, by comparison of Monte Carlo simulation results with the experiment results: A process to reconfirm the plant parameters after execution of a task and feedback paths from this process to the observation and the task definition of next task were observed. The feedback probability average and standard deviation should be determined for each incident type to explain correctly the individual differences in the cognitive processes. The tendency for the operator's cognitive level to change from skill-based to knowledge-based via rule-based behavior was observed during the feedback process

  17. Exploitation of the in-seam miner and operational experience

    Energy Technology Data Exchange (ETDEWEB)

    Wilson, W I.S.; Morris, A H

    1977-12-01

    The In-seam Miner started as an investigatory project at MRDE in 1969. Since that time it has passed through the classic development stages of design of prototype, surface trials, underground trials, modification, production of more machines, assessment of experience and then wider exploitation. At the present time well over 100 machines have been supplied to the National Coal Board. The original machine was hydraulically driven and all but five of the machines supplied to date are of this type. The variety of applications that the machine has found in the mining industry has caused derivative development to embrace machines of length varying from 12-ft centers to 44-ft centers, to work in seams ranging from 40 in. up to 68 in. The range of applications has included face drivages, stablehole operations, in-seam retreat roadways and dirt-absorbing headings. Five electrically driven machines are now coming onto the market and experience with them, though limited, is very encouraging. The paper concentrates on two major aspects of the overall development process: first, the management of exploitation; and second, some operational experience of the In-seam Miner in South Midlands area.

  18. International Experience in Upper Echelon Theory: Literature Review

    Directory of Open Access Journals (Sweden)

    Đerđa Dino

    2017-09-01

    Full Text Available Background: The international experience of top managers is an evolving research within the upper echelon theory; therefore this literature review summarizes everything made so far.

  19. Proceedings of the NEA/CSNI-UNIPEDE Specialist Meeting on Operating Experience with Steam Generators

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1991-07-01

    The long history of operating experience with pressurized water reactors has indicated that the steam generators are of primary importance in nuclear power plant design and operation; this is furthermore confirmed by analyzing the data of the Incident Reporting System (IRS). It is for this reason that the OECD/NEA Committee on the Safety of Nuclear Installations organizes, in cooperation with UNIPEDE, a Specialist Meeting on 'Operating Experience with Steam Generators'. This Specialist Meeting, held in Brussels, Belgium, in September 1991, is hosted by the Belgian Government and AIB-Vincotte Nuclear. In addition to being a follow-up to the October 1984 meeting (organized by the CSNI and UNIPEDE in Stockholm, Sweden), this Meeting reviews the current state-of-the-art of steam generator technology thus providing a forum for the exchange of related experience in operation, inspection, maintenance, repair, modifications, replacement, and licensing requirements pertaining to steam generators. Forty-seven papers are presented in eight sessions entitled: Operating Experience (two sessions), Structural Integrity and Licensing Issues, Analysis and Prediction of Degradation Mechanisms, Inservice Inspection Methods, Preventive and Corrective Actions (two sessions) and Replacement of Steam Generators. There are furthermore two panel sessions entitled 'Observed Degradation Mechanisms and Licensing Positions', and 'Inspection, Repair and Replacement Strategies'. These proceedings consist of a compilation of the papers presented at the Meeting, which is attended by more than one hundred and fifty participants from fifteen countries and several international organisations.

  20. Laparoscopic myotomy in achalasia cardia treatment: Experience after 36 operations

    Directory of Open Access Journals (Sweden)

    Bjelović Miloš

    2013-01-01

    Full Text Available Introduction. Laparoscopic Heller­Dor operation, a standard method in the treatment of achalasia, has been performed at the Center for Esophageal Surgery of the First Surgical Clinic since April 2006. Objective. The aim of this study was to present this surgical procedure and initial experiences after 36 consecutive laparoscopic Heller­Dor operations. Methods. This partly retrospective, partly prospective study presented our results after laparoscopic Heller­Dor operation (presentation of the treatment method. We performed a standard anterior esophagocardioymiotomy, without releasing the posterior aspect of the cardia, and anterior partial fundoplication. The type and severity of symptoms and their duration were evaluated based on questionnaires fulfilled by patients. The diagnosis was made based on radiological, endoscopic and manometric findings. Laparoscopic surgery as the method of treatment was evaluated based on the duration of surgery, intra­ and postoperative complications, time interval until the initiation of oral feeding, length of hospital stay, need for additional therapeutic measures after the operation and effect of surgery on the severity of symptoms. Results. Preopereratively, dysphagia was the predominant symptom in all patients, while regurgitation was much lower (44%. The average duration of operation was 127 minutes. Postoperative hospitalization lasted on the average 5.7 days. From 36 treated patients, 34 (94.4% considered that the effect of treatment was good or excellent. Postoperative dysphagia was present in two patients (5.6% and was successfully solved by balloon dilatation. Conclusion. Laparoscopic Heller­Dor operation is an effective and safe surgical procedure in resolving symptoms of achalasia and today presents the method of the first choice in the treatment of this disease.

  1. 0 + 5 Vascular Surgery Residents' Operative Experience in General Surgery: An Analysis of Operative Logs from 12 Integrated Programs.

    Science.gov (United States)

    Smith, Brigitte K; Kang, P Chulhi; McAninch, Chris; Leverson, Glen; Sullivan, Sarah; Mitchell, Erica L

    2016-01-01

    Integrated (0 + 5) vascular surgery (VS) residency programs must include 24 months of training in core general surgery. The Accreditation Council for Graduate Medical Education currently does not require specific case numbers in general surgery for 0 + 5 trainees; however, program directors have structured this time to optimize operative experience. The aim of this study is to determine the case volume and type of cases that VS residents are exposed to during their core surgery training. Accreditation council for graduate medical education operative logs for current 0 + 5 VS residents were obtained and retrospectively reviewed to determine general surgery case volume and distribution between open and laparoscopic cases performed. Standard statistical methods were applied. A total of 12 integrated VS residency programs provided operative case logs for current residents. A total of 41 integrated VS residents in clinical years 2 through 5. During the postgraduate year-1 training year, residents participated in significantly more open than laparoscopic general surgery cases (p surgery cases are hernia repair (20%), skin and soft tissue (7.4%), and breast (6.3%). Residents in programs with core surgery over 3 years participated in significantly more general surgery operations compared with residents in programs with core surgery spread out over 4 years (p = 0.035). 0 + 5 VS residents perform significantly more open operations than laparoscopic operations during their core surgery training. The majority of these operations are minor, nonabdominal procedures. The 0 + 5 VS residency program general surgery operative training requirements should be reevaluated and case minimums defined. The general surgery training component of 0 + 5 VS residencies may need to be restructured to meet the needs of current and future trainees. Copyright © 2016 Association of Program Directors in Surgery. Published by Elsevier Inc. All rights reserved.

  2. Recent experience of Almaraz NPP in operator training

    International Nuclear Information System (INIS)

    Sanchez Cabanero, J.G.; Gomez de la Torre, J.M.

    1994-01-01

    In recent years the nuclear industry has been paying special attention to boosting nuclear power plant operation. To this end, it has optimized its maintenance, engineering, safety, management and other systems, using the appropriate resources to achieve its target. Optimization of these systems required the allocation of new resources for training plant personnel. The activity of training, which hitherto dedicated most of its attention and resources to the operating area, now extends them to schooling required in other areas of the plant, with the aim of updating the skills and knowledge of personnel to deal with new needs which have arisen. Regulations at present cover the training and qualification of only personnel responsible for handling reactor or for directing plant operation activities and capable of evaluating the nature and magnitude of possible incidents, especially those causing radioactive emissions, and of personnel requiring knowledge and experience to guarantee effective protection of individuals, ie, operators, supervisors, and qualified radiological protection experts. However, it should be borne in mind that, in the future, the training of other plant personnel could also be subject to regulations. (Author)

  3. Operational Experience with the ATLAS Pixel Detector at the LHC

    CERN Document Server

    Keil, M; The ATLAS collaboration

    2011-01-01

    The ATLAS Pixel Detector is the innermost detector of the ATLAS experiment at the Large Hadron Collider at CERN, providing high-resolution measurements of charged particle tracks in the high radiation environment close to the collision region. This capability is vital for the identification and measurement of proper decay times of long-lived particles such as b-hadrons, and thus vital for the ATLAS physics program. The detector provides hermetic coverage with three cylindrical layers and three layers of forward and backward pixel detectors. It consists of approximately 80 million pixels that are individually read out via chips bump-bonded to 1744 n-in-n silicon substrates. In this talk, results from the successful operation of the Pixel Detector at the LHC will be presented, including monitoring, calibration procedures, timing optimization and detector performance. The detector performance is excellent: 97,5% of the pixels are operational, noise occupancy and hit efficiency exceed the design specification, an...

  4. Operational experience with the ATLAS Pixel Detector at the LHC

    CERN Document Server

    Hirschbuehl, D; The ATLAS collaboration

    2011-01-01

    The ATLAS Pixel Detector is the innermost detector of the ATLAS experiment at the Large Hadron Collider at CERN, providing high-resolution measurements of charged particle tracks in the high radiation environment close to the collision region. This capability is vital for the identification and measurement of proper decay times of long-lived particles such as b-hadrons, and thus vital for the ATLAS physics program. The detector provides hermetic coverage with three cylindrical layers and three layers of forward and backward pixel detectors. It consists of approximately 80 million pixels that are individually read out via chips bump-bonded to 1744 n-in-n silicon substrates. In this paper results from the successful operation of the Pixel Detector at the LHC will be presented, including monitoring, calibration procedures, timing optimization and detector performance. The detector performance is excellent: 96.7% of the pixels are operational, noise occupancy and hit efficiency exceed the design specification, an...

  5. Operational experience with the ATLAS Pixel Detector at the LHC

    CERN Document Server

    Lapoire, C; The ATLAS collaboration

    2011-01-01

    The ATLAS Pixel Detector is the innermost detector of the ATLAS experiment at the Large Hadron Collider at CERN, providing high-resolution measurements of charged particle tracks in the high radiation environment close to the collision region. This capability is vital for the identification and measurement of proper decay times of long-lived particles such as b-hadrons, and thus vital for the ATLAS physics program. The detector provides hermetic coverage with three cylindrical layers and three layers of forward and backward pixel detectors. It consists of approximately 80 million pixels that are individually read out via chips bump-bonded to 1744 n-in-n silicon substrates. In this talk, results from the successful operation of the Pixel Detector at the LHC will be presented, including monitoring, calibration procedures, timing optimization and detector performance. The detector performance is excellent: 97,5% of the pixels are operational, noise occupancy and hit efficiency exceed the design specification, an...

  6. Operational Experience with the ATLAS Pixel Detector at the LHC

    CERN Document Server

    Lapoire, C; The ATLAS collaboration

    2012-01-01

    The ATLAS Pixel Detector is the innermost detector of the ATLAS experiment at the Large Hadron Collider at CERN, providing high-resolution measurements of charged particle tracks in the high radiation environment close to the collision region. This capability is vital for the identification and measurement of proper decay times of long-lived particles such as B-hadrons, and thus vital for the ATLAS physics program. The detector provides hermetic coverage with three cylindrical layers and three layers of forward and backward pixel detectors. It consists of approximately 80 million pixels that are individually read out via chips bump-bonded to 1744 n-in-n silicon substrates. In this paper, results from the successful operation of the Pixel Detector at the LHC will be presented, including monitoring, calibration procedures and detector performance. The detector performance is excellent: 96.2% of the pixels are operational, noise occupancy and hit efficiency exceed the design specification.

  7. Operational Experience with the ATLAS Pixel Detector at the LHC

    CERN Document Server

    Keil, M

    2012-01-01

    The ATLAS Pixel Detector is the innermost detector of the ATLAS experiment at the Large Hadron Collider at CERN, providing high-resolution measurements of charged particle tracks in the high radiation environment close to the collision region. This capability is vital for the identification and measurement of proper decay times of long-lived particles such as b-hadrons, and thus vital for the ATLAS physics program. The detector provides hermetic coverage with three cylindrical layers and three layers of forward and backward pixel detectors. It consists of approximately 80 million pixels that are individually read out via chips bump-bonded to 1744 n-in-n silicon substrates. In this paper results from the successful operation of the Pixel Detector at the LHC will be presented, including calibration procedures, timing optimization and detector performance. The detector performance is excellent: approximately 97% of the pixels are operational, noise occupancy and hit efficiency exceed the design specification, an...

  8. Operational experience with the ATLAS Pixel Detector at the LHC

    CERN Document Server

    Ince, T; The ATLAS collaboration

    2011-01-01

    The ATLAS Pixel Detector is the innermost detector of the ATLAS experiment at the Large Hadron Collider at CERN, providing high-resolution measurements of charged particle tracks in the high radiation environment close to the collision region. This capability is vital for the identification and measurement of proper decay times of long-lived particles such as b-hadrons, and thus vital for the ATLAS physics program. The detector provides hermetic coverage with three cylindrical layers and three layers of forward and backward pixel detectors. It consists of approximately 80 million pixels that are individually read out via chips bump-bonded to 1744 n-in-n silicon substrates. In this talk, results from the successful operation of the Pixel Detector at the LHC will be presented, including monitoring, calibration procedures, timing optimization and detector performance. The detector performance is excellent: 96.8% of the pixels are operational, noise occupancy and hit efficiency exceed the design specification, an...

  9. Operational experience with the ATLAS Pixel detector at the LHC

    CERN Document Server

    Deluca, C; The ATLAS collaboration

    2011-01-01

    The ATLAS Pixel Detector is the innermost detector of the ATLAS experiment at the Large Hadron Collider at CERN, providing high-resolution measurements of charged particle tracks in the high radiation environment close to the collision region. This capability is vital for the identification and measurement of proper decay times of long-lived particles such as b-hadrons, and thus vital for the ATLAS physics program. The detector provides hermetic coverage with three cylindrical layers and three layers of forward and backward pixel detectors. It consists of approximately 80 million pixels that are individually read out via chips bump-bonded to 1744 n-in-n silicon substrates. In this paper, results from the successful operation of the Pixel Detector at the LHC will be presented, including monitoring, calibration procedures, timing optimization and detector performance. The detector performance is excellent: 97,5\\% of the pixels are operational, noise occupancy and hit efficiency exceed the design specification, ...

  10. Operational Experience with the ATLAS Pixel Detector at the LHC

    CERN Document Server

    Lange, C; The ATLAS collaboration

    2011-01-01

    The ATLAS Pixel Detector is the innermost detector of the ATLAS experiment at the Large Hadron Collider at CERN, providing high-resolution measurements of charged particle tracks in the high radiation environment close to the collision region. This capability is vital for the identification and measurement of proper decay times of long-lived particles such as b-hadrons, and thus vital for the ATLAS physics program. The detector provides hermetic coverage with three cylindrical layers and three layers of forward and backward pixel detectors. It consists of approximately 80 million pixels that are individually read out via chips bump- bonded to 1744 n-in-n silicon substrates. In this talk, results from the successful operation of the Pixel Detector at the LHC will be presented, including monitoring, calibration procedures, timing optimization and detector performance. The detector performance is excellent: 97,5% of the pixels are operational, noise occupancy and hit efficiency exceed the design specification, a...

  11. Operational experience with the ATLAS Pixel detector at the LHC

    CERN Document Server

    Deluca, C; The ATLAS collaboration

    2011-01-01

    The ATLAS Pixel Detector is the innermost detector of the ATLAS experiment at the Large Hadron Collider at CERN, providing high-resolution measurements of charged particle tracks in the high radiation environment close to the collision region. This capability is vital for the identification and measurement of proper decay times of long-lived particles such as b-hadrons, and thus vital for the ATLAS physics program. The detector provides hermetic coverage with three cylindrical layers and three layers of forward and backward pixel detectors. It consists of approximately 80 million pixels that are individually read out via chips bump-bonded to 1744 n-in-n silicon substrates. In this talk, results from the successful operation of the Pixel Detector at the LHC will be presented, including monitoring, calibration procedures, timing optimization and detector performance. The detector performance is excellent: 97,5% of the pixels are operational, noise occupancy and hit efficiency exceed the design specification, an...

  12. SUPERCONDUCTING RADIO-FREQUENCY MODULES TEST FACILITY OPERATING EXPERIENCE

    International Nuclear Information System (INIS)

    Soyars, W.; Bossert, R.; Darve, C.; Degraff, B.; Klebaner, A.; Martinez, A.; Pei, L.; Theilacker, J.

    2008-01-01

    Fermilab is heavily engaged and making strong technical contributions to the superconducting radio-frequency research and development program (SRF R and D). Four major SRF test areas are being constructed to enable vertical and horizontal cavity testing, as well as cryomodule testing. The existing Fermilab cryogenic infrastructure has been modified to service the SRF R and D needs. The project's first stage has been successfully completed, which allows for distribution of cryogens for a single-cavity cryomodule using the existing Cryogenic Test Facility (CTF) that houses three Tevatron satellite refrigerators. The cooling capacity available for cryomodule testing at Meson Detector Building (MDB) results from the liquefaction capacity of the CTF cryogenic system. The cryogenic system for a single 9-cell cryomodule is currently operational. The paper describes the status, challenges and operational experience of the initial phase of the project

  13. Operating experience with the new TRIUMF RF control system

    International Nuclear Information System (INIS)

    Fong, K.; Laverty, M.; Fang, S.

    1995-06-01

    The 23 MHz rf control of the TRIUMF cyclotron has been replaced by a new VXI control system based on digital signal processing. It provides amplitude and phase regulation of the cyclotron dee voltage, as well as other functions such as power-up sequencing, spark and high VSWR protection. Modularity of the hardware is achieved by the VXI architecture, and in the software by Object Oriented Programming. It is expected that this will result in a considerably longer MTBF, and shorter fault diagnosis and repair times, than the equipment it replaces. The new system has now been in operation for over two months. The results of commissioning, testing, and early operating experience are presented. (author). 4 refs., 5 figs

  14. Operational experience with Seibersdorf low-level incinerator

    International Nuclear Information System (INIS)

    Chalupa, G.

    1987-01-01

    This report contains information about an excess air incinerator which burned low level β and γ wastes (also α up to determined limits). The incinerator was started up in 1980 and it is clear that in a technical plant of such magnitude, some changes and alterations will be needed to be overcome according to the experiences of operation. This paper - after a short description of the incinerator plant itself - gives a summary of some of the operation and the changes which are made in the plant according to these facts. A partial redesign of the incinerator plant in the first half of 1985 resulted in a very satisfying new design, which proved its superiority during the runs in 1985 and 1986

  15. Operational experience, availability and reliability of nuclear power plants

    International Nuclear Information System (INIS)

    Kueffer, K.

    1980-01-01

    This lecture - presents a survey on nuclear power production and plant performance in the Western World covering all reactor types and light-water reactors in particular and discusses key parameters such as load factors and non-availability analysis. - outlines the main reasons for the reliable performance of Swiss nuclear power plants - quality equipment - operator qualification and training - engineering know how on site - maintenance philosophy and outage planning - information system and feedback of experience - explains the management functions as applied at the Beznau Nuclear Power Station to ensure high power productivity and reliability - improvement - a feedback control system - analysis of production losses - optimization in shut-down planning - minimizing disturbances during plant operation - optimizing personnel qualification and efficiency. (orig.)

  16. Operational Experience with a Cryogenic Axial-Centrifugal Compressor

    CERN Document Server

    Decker, L; Löhlein, K; Purtschert, W; Ziegler, B L; Lebrun, P; Tavian, L; Brunovsky, I; Tucek, L

    1998-01-01

    The Large Hadron Collider (LHC), presently under construction at CERN, requires large refrigeration capacity at 1.8 K. Compression of gaseous helium at cryogenic temperatures is therefore inevitable. Together with subcontractors, Linde Kryotechnik has developed a prototype machine. This unit is based on a cryogenic axial-centrifugal compressor, running on ceramic ball bearings and driven by a variable-frequency electrical motor operating at ambient temperature. Integrated in a test facility for superconducting magnets the machine has been commissioned without major problems and successfully gone through the acceptance test in autumn 1995. Subsequent steps were initiated to improve efficiency of this prototype. This paper describes operating experience gained so far and reports on measured performance prior to and after constructional modifications.

  17. Safety aspects and operating experience of LWR plants in Japan

    International Nuclear Information System (INIS)

    Aoki, S.; Hinoki, M.

    1977-01-01

    From the outset of nuclear power development in Japan, major emphasis has been placed on the safety of the nuclear power plants. There are now twelve nuclear power plants in operation with a total output of 6600 MWe. Their operating records were generally satisfactory, but in the 1974 to 1975 period, they experienced somewhat declined availability due to the repair work under the specific circumstances. After investigation of causes of troubles and the countermeasures thereof were made to ensure safety, they are now keeping good performance. In Japan, nuclear power plants are strictly subject to sufficient and careful inspection in compliance with the safety regulation, and are placed under stringent radiation control of employees. Under the various circumstances, however, the period of annual inspection tends to be prolonged more than originally planned, and this consequently is considered to be one of the causes of reduced availability. In order to develop nuclear power generation for the future, it is necessary to put further emphasis on the assurance of safety and to endeavor to devise measures to improve availability of the plants, based on the careful analysis of causes which reduce plant availability. This paper discusses the results of studies made for the following items from such viewpoints: (1) Safety and Operating Experience of LWR Nuclear Power Plants in Japan; a) Operating experience with light water reactors b) Improvements in design of light water reactors during the past ten years c) Analysis of the factors which affect plant availability; 2) Assurance of Safety and Measures to Increase Availability a) Measures for safety and environmental protection b) Measures to reduce radiation exposure of employees c) Appropriateness of maintenance and inspection work d) Measures to increase plant availability e) Measures to improve reliability of equipments and components; and 3) Future Technical Problems

  18. Nuclear Power Plant Operating Experience from the IAEA/NEA International Reporting System for Operating Experience, 2005-2008

    International Nuclear Information System (INIS)

    2010-06-01

    The fundamental objective of the Incident Reporting System (IRS) is to contribute to improving the safety of commercial nuclear power plants which are operated worldwide. This fourth publication, covering the period 2005-2008, follows on the success of the previous three. It highlights important lessons learned based on a review of the approximately 200 event reports received from the participating countries over this period. The book is written both for a non-technical audience and for senior officials in industry and government who have decision making roles in the nuclear power industry.

  19. Operational experience with two tritium-effluent-monitoring systems

    International Nuclear Information System (INIS)

    Haynie, J.S.; Gutierrez, J.A.

    1982-01-01

    Two new tritium stack monitoring systems were designed and built. The operational experience of a wide-range detector with a useful range of a few μCi/m 3 to 10 8 μCi/m 3 , and a second monitoring system using an improved Kanne chamber and a new electrometer, called a Model 39 Electrometer-Chargemeter are discussed. Both tritium chambers have been designed to have a reduced sensitivity to tritium contamination, a fast response, and an integrating chargemeter with digital readout for easy conversion to microcuries. The calibration of these monitors and advantages of using these chambers over conventional systems are discussed

  20. First insights from common GRS and IRSN evaluations of operational experiences for the European Clearinghouse

    International Nuclear Information System (INIS)

    Maqua, M.; Bertrand, R.

    2012-01-01

    The European Clearinghouse on Operating Experience Feedback (OEF) for NPPs was established in 2008 by several European Nuclear Safety Regulators. The technical work on common operational experience evaluation was launched at the Joint Research Center of the European Union. Main goals of the European Clearinghouse include promotion of collaboration on OEF, dissemination of the lessons learnt from NPP operational experience and promoting advanced event assessment approaches and methods. The extended knowledge of both IRSN and GRS in the evaluation of the national operating experiences in France and Germany, respectively, is used by the European Clearinghouse with the objective of receiving detailed insights on safety related topics. IRSN and GRS develop common reports on safety issues upon request of the Clearinghouse that involve a detailed review of their national event databases, and that are combined afterwards in a European Clearinghouse report including also the review carried out by the JRC on the basis of the Incident Report System (IRS) database and the US NRC Licensee Event Reports (LERs) database. The aim is to perform in-depth analyses (causes, root causes, contributing factors, actual and potential consequences, and lessons learnt) of specific OEF topics. 3 topics have been already analyzed: -) external events (Serious accidents caused by external hazards were not found in the German and French operating experience), -) ageing of components (it can be concluded that ageing management in French and German NPP is basically effective), and -) component supply (the main cause for events related to the supply of components was insufficiency during manufacturing or testing). This paper is followed by the slides of the presentation

  1. Periodic Safety Review of Nuclear Power Plants: Experience of Member States

    International Nuclear Information System (INIS)

    2010-04-01

    Routine reviews of nuclear power plant operation (including modifications to hardware and procedures, operating experience, plant management and personnel competence) and special reviews following major events of safety significance are the primary means of safety verification. In addition, many Member States of the IAEA have initiated systematic safety reassessments, termed periodic safety reviews, of nuclear power plants, to assess the cumulative effects of plant ageing and plant modifications, operating experience, technical developments and siting aspects. The reviews include an assessment of plant design and operation against current safety standards and practices, and they have the objective of ensuring a high level of safety throughout the plant's operating lifetime. They are complementary to the routine and special safety reviews and do not replace them. Periodic safety reviews of nuclear power plants are considered an effective way to obtain an overall view of actual plant safety, and to determine reasonable and practical modifications that should be made in order to maintain a high level of safety. They can be used as a means of identifying time limiting features of the plant in order to determine nuclear power plant operation beyond the designed lifetime. The periodic safety review process can be used to support the decision making process for long term operation or licence renewal. Since 1994, the use of periodic safety reviews by Member States has substantially broadened and confirmed its benefits. Periodic safety review results have, for example, been used by some Member States to help provide a basis for continued operation beyond the current licence term, to communicate more effectively with stakeholders regarding nuclear power plant safety, and to help identify changes to plant operation that enhance safety. This IAEA-TECDOC is intended to assist Member States in the implementation of a periodic safety review. This publication complements the

  2. BR3/Vulcain Nuclear Power Station. Construction and Operational Experience

    Energy Technology Data Exchange (ETDEWEB)

    Storrer, J. [Belgonucleaire, S.A., Brussels (Belgium)

    1968-04-15

    A full-scale reactor experiment was set out as the main objective of the Vulcain research and development programme agreed in May 1962 between the UKAEA and BelgoNucleaire, manager of ''Syndicat Vulcain''. Vulcain uses variable moderation as the long-term method to control reactivity: the reactor is cooled and moderated by a mixture of heavy and light water, the D{sub 2}O content being stepwise reduced to permit power operation with all control rods completely out of the core. To carry out the Vulcain power experiment it was decided to modify the BR3 nuclear power plant located at Mol, Belgium, which had operated from 1962 to 1964 as a conventional PWR with outputs of 40.9 MW(th) and 11.45 MW(e). The BR3/Vulcain plant was started in December 1966 and since then is running with a load factor around 90%. It is the first time that such a reactor type has been built and operated and the experience gained by its design, construction, commissioning and operation has proven to be most valuable. D{sub 2}O is being used at a pressure (2000 lb/in{sup 2} abs.) never before achieved in a heavy-water reactor and the leak rate from the HP primary systems to the atmosphere has been kept to a negligible value, around 1 to 2 grams/h. Commissioning of the primary plant had been carried out with light water first without fuel, and thereafter with fuel, at which time the water was poisoned with boric acid. The reactor vessel contains experimental devices such as 65 in-pile instrumentation detectors and four hydraulically operated Zircaloy control rods. They required the interposition of a collar between the vessel and its lid. Refuelling is performed under boronated light water, the interchange between the primary water and the H{sub 2}O being carried out by means of a draining and spraying system. The reactor had been operated for two years before its modifications for Vulcain: many lessons have therefore been learned about working on irradiated systems. The BR3/Vulcain core has a

  3. Operational safety performance indicator system at the Dukovany Nuclear Power Plant - Experience with indicator aggregation

    International Nuclear Information System (INIS)

    Mandula, J.

    2001-01-01

    The operational safety performance indicators serve as an important tool of performance monitoring and management at the Dukovany NPP. A software-supported system has been developed, which has included: data collection, central data storage, graphic output production and periodical report generation. Analyses of performance indicator trends together with evaluation in respect of annually updated target values and acceptance criteria are used for operational safety reviews forming an integral part of continual self-assessment process. This contribution has been focused on experience obtained during development of the operational safety assessment model using indicator aggregation. It summarises problems that had to be paid specific attention in the development process. Thanks to their solution, the model has become a synoptic monitor and a useful tool for operational safety assessment. (author)

  4. Fabrication and operational experience with the interim storage cask

    International Nuclear Information System (INIS)

    Scott, P.L.

    1998-01-01

    This paper discusses the fabrication and operational experience of the Interim Storage Cask (ISC). The ISC is a dry storage cask which is used to safely store a Core Component Container (CCC) containing up to seven Fast Flux Test Facility (FFTF) spent fuel assemblies at the US Department of Energy's Hanford Site. Under contract to B and W Hanford Company (BWHC), General Atomics (GA) designed and fabricated thirty ISC casks which BWHC is remotely loading at the FFTF facility. BWHC designed and fabricated the CCCS. As of December 1997, thirty ISCs have been fabricated, of which eighteen have been loaded and moved to a storage site adjacent to the FFTF facility. Fabrication consisted of three sets of casks. The first unit was completed and acceptance tested before any other units were fabricated. After the first unit passed all acceptance tests, nine more units were fabricated in the first production run. Before those nine units were completed, GA began a production run of twenty more units. The paper provides an overview of the cask design and discusses the problems encountered in fabrication, their resolution, and changes made in the fabrication processes to improve the quality of the casks. The paper also discusses the loading process and operational experiences with loading and handling of the casks. Information on loading times, worker dose exposure, and total dose for loading are presented

  5. An overview of KANUPP operating experience in chemistry

    International Nuclear Information System (INIS)

    Hashmi, T.

    2010-01-01

    KANUPP is a small CANDU® type PHWR (137MWe), commissioned in 1972 and now operating after life extension (PLEX) since 2004. This paper contains an overview of the plant operating experience in chemistry control over the past year including life extension period. Emphasis is on: Success story; Practices; Future improvements in chemistry programs. Considerable efforts are underway to maintain plant equipment and systems to mitigate the effect of plant ageing. The improvements that have been made at the station are as under: Heat transport system (HTS) chemistry, its effects on construction material; Feed water chemistry on secondary side (considering the condenser leaks). Strict chemistry control is being exercised for the heat transport system (HTS) for its better chemistry control. For short term, the changes are limited to pH adjustments of HTS. This change decreases the rate of thinning of outlet feeders as noted in some CANDUs® due to flow accelerated corrosion (FAC). Water Treatment Plant has been refurbished to get very low total dissolved solids (TDS) de-mineralized water for secondary side systems of the plant. Experience of steam generators flushing before startup, sludge pile analyses mapping, verification of pH from different sampling points of SGs, are the short term mitigating actions to address sludge pile problem in steam generators (SGs). The R and D on HTS and SGs is multifaceted and is aimed at achieving optimum chemistry control. Study is being conducted for improving chemistry control for the material, equipment and systems of the plant. (author)

  6. Inspection-Class Remotely Operated Vehicles—A Review

    Directory of Open Access Journals (Sweden)

    Romano Capocci

    2017-03-01

    Full Text Available This paper presents a review of inspection-class Remotely Operated Vehicles (ROVs. The review divides the classification of inspection-class ROVs; categorising the vehicles in order of size and capability. A state of the art technology review is undertaken, discussing various common subsystems of the ROV. Standard and novel ROV shapes and designs are reviewed, with emphasis on buoyancy, frame materials and hydrodynamics. Several power considerations and designs are discussed, accounting for battery fed and mains fed systems. ROV telemetry is split into a discussion on the various transmission hardware systems and the communication protocols that are most widely used in industry and research today. A range of thruster technologies is then introduced with consideration taken of the various thruster architectures available. Finally, the navigation and positioning sensors employed for ROV navigation and control are reviewed. The author has also created a number of comparison tables throughout the review; tables include comparison of wired data transmission technology, comparison of common ROV communication protocols and comparisons of various inertial navigation systems. By the end of the review the reader will have clearer understanding on the fundamentals of inspection-class ROV technologies and can use this as an introduction to further paper investigation.

  7. Operational experience of the Marcoule reactors; Experience d'exploitation des reacteurs de Marcoule

    Energy Technology Data Exchange (ETDEWEB)

    Conte, F [Commissariat a l' Energie Atomique, Centre de Production de Plutonium, Marcoule (France). Centre d' Etudes Nucleaires

    1963-07-01

    The results obtaining from three years operation of the reactors G-2, G-3 have made it possible to accumulate a considerable amount of operational experience of these reactors. The main original points: - the pre-stressed concrete casing - the possibility of loading while under power - automatic temperature control have been perfectly justified by the results of operation. The author confirms the importance of these original solutions and draws conclusions concerning the study of future nuclear power stations. (author) [French] Les resultats atteints apres trois ans de fonctionnement des reacteurs G-2/G-3 permettent une accumulation considerable de l'experience d'exploitation de ces reacteurs. Les principales originalites: - caisson en beton precontraint - chargement en marche - surveillance automatique des temperatures sont largement justifiees par l'exploitation actuelle. L'auteur confirme l'interet de ces solutions d'avant-garde et en tire des conclusions pour les etudes de futures centrales nucleaires. (auteur)

  8. Operating experience and design criteria of sodium valves

    International Nuclear Information System (INIS)

    Markford, D.

    1974-01-01

    The information presented refers to sodium valve development for KNK and SNR-300 as well as for sodium test facilities on the INTERATOM site at Bensberg. Well in advance of KNK-I a number of sodium test facilities have been operated containing small and medium size valves of different design and manufacturer. The more stringent requirements for long range safe and reliable operation in KNK-I put forth a development program for the main primary and secondary circuit sodium valves. Operational experience gave rise to modification of the stem seal arrangement mainly, so KNK-II (which is the fast core for KNK reactor) will be run with modified sodium valves. Main pipe diameters in SNR-300 are in the range of 600 mm. Valve designs with rising shafts would require excessive space in the primary circuit cavities, therefore efforts have been directed towards introduction of different type valves. Due to the requirements of after-heat-removal a valve type with control capability had to be chosen. A special design of butterfly valves was selected for the primary and secondary circuits of SNR-300. The development and tests performed with this type of valve are described. In the field of small sodium valves, tests with a 50 mm diameter freeze-seal valve are reported, and the current status of bellows-seal-valves to be inserted into SNR-300 is discussed. (U.S.)

  9. Highly active vitrification plant remote handling operational experience and improvements

    International Nuclear Information System (INIS)

    Milgate, I.

    1996-01-01

    All the main process plant and equipment at the Sellafield Waste Vitrification Plant (WVP) is enclosed in heavily shielded concrete walled cells. There is a large quantity of relatively complex plant and equipment which must be remotely operated, maintained or replaced in-cell in a severe environment. The WVP has five in-cell polar cranes which are of modular construction to aid replacement of failed components. Each can be withdrawn into a shielded cell extension for decontamination and hands-on maintenance. The cells have a total of 80 through wall tube positions to receive Master Slave Manipulators (MSMs). The MSMs are used where possible for ''pick and place'' purposes but are often called upon to position substantial pieces of mechanical equipment and thus are subject to heavy loading and high failure rates. An inward flow of air is maintained in the active cells. The discharged air passes through a filter cell where remote damper operation filter changing and maintenance is carried out by means of a PAR3000 manipulator. A Nuclear Engineered Advanced Teleoperated Robot (Neater) swabs the vitrified product container to ensure cleanliness before storage. There is a significant arising of solid radioactive waste from replaced in-cell items which undergoes sorting and size reduction in a breakdown cell equipped with a large reciprocating saw and a hydraulic shear. Improvements to the remote handling facilities made in the light of operational experience are described. (UK)

  10. Operational experience - Lessons learned from IRS-reports in Germany

    International Nuclear Information System (INIS)

    Wetzel, N.; Maqua, M.

    2005-01-01

    The international Incident Reporting System (IRS), jointly operated by IAEA and OECD-NEA, is a main source of safety significant findings and lessons learned of nuclear operating experience. GRS (Gesellschaft fuer Anlagen- und Reaktorsicherheit mbH) is a scientific-technical expert and research organisation. On Behalf of the Federal Minister of Environment, Nature Conservation and Reactor Safety (BMU), GRS provides the IRS officer. The evaluation of IRS-Reports and the dissemination of the main findings including the assessment of the relevance for German NPPs is task of GRS. The value of IRS is among experts undoubted. But nevertheless, the reporting to IRS decreases since some years. This presentation is aimed to show the support of IRS in strengthening the safety of German NPPs. The evaluation of IRS-Reports at GRS is three-fold. It comprises initial screening, quarterly and yearly reporting and the development of specific German Information Notices on safety significant events with direct applicability to German NPPs. Some examples of lessons learned from recent international events are discussed below. These examples shall demonstrate that the use of the IRS enhances significantly the knowledge on operational events. (author)

  11. OECD/NEA component operational experience, degradation and ageing project

    International Nuclear Information System (INIS)

    Gott, K.; Nevander, O.; Riznic, J.; Lydell, B.

    2015-01-01

    Several OECD Member Countries have agreed to establish the OECD/NEA 'Component Operational Experience, Degradation and Ageing Programme' (CODAP) to encourage multilateral co-operation in the collection and analysis of data relating to degradation and failure of metallic piping and non-piping metallic passive components in commercial nuclear power plants. The scope of the data collection includes service-induced wall thinning, part through-wall cracks, through-wall cracks with and without active leakage, and instances of significant degradation of metallic passive components, including piping pressure boundary integrity. CODAP is the continuation of the 2002-2011 'OECD/NEA Pipe Failure Data Exchange Project' (OPDE) and the Stress Corrosion Cracking Working Group of the 2006-2010 - OECD/NEA SCC and Cable Ageing project - (SCAP). OPDE was formally launched in May 2002. Upon completion of the 3. Term (May 2011), the OPDE project was officially closed to be succeeded by CODAP. In May 2011, 13 countries signed the CODAP first Term agreement. The first Term (2011-2014) work plan includes the development of a web-based relational event database on passive, metallic components in commercial nuclear power plants, a web-based knowledge base on material degradation, codes and standards relating to structural integrity and national practices for managing material degradation. The work plan also addresses the preparation of Topical Reports to foster technical cooperation and to deepen the understanding of national differences in ageing management. These Topical Reports are in the public domain and available for download on the NEA web site. Published in 2014, a first Topical Report addressed flow accelerated corrosion (FAC) of carbon steel and low alloy steel piping. A second Topical Report addresses operating experience with electro-hydraulic control (EHC) and instrument air (IA) system piping

  12. Operational safety review programmes for nuclear power plants. Guidelines for assessment

    International Nuclear Information System (INIS)

    2002-01-01

    The IAEA has been offering the Operational Safety Review Team (OSART) programme to provide advice and assistance to Member States in enhancing the operational safety of nuclear power plants (NPPs). Simultaneously, the IAEA has encouraged self-assessment and review by Member States of their own nuclear power plants to continuously improve nuclear safety. Currently, some utilities have been implementing safety review programmes to independently review their own plants. Corporate or national operational safety review programmes may be compliance or performance based. Successful utilities have found that both techniques are necessary to provide assurance that (i) as a minimum the NPP meets specific corporate and legal requirements and (ii) management at the NPP is encouraged to pursue continuous improvement principles. These programmes can bring nuclear safety benefits to the plants and utilities. The IAEA has conducted two pilot missions to assess the effectiveness of the operational review programme. Based on these missions and on the experience gained during OSART missions, this document has been developed to provide guidance on and broaden national/corporate safety review programmes in Member States, and to assist in maximizing their benefits. These guidelines are intended primarily for the IAEA team to conduct assessment of a national/corporate safety review programme. However, this report may also be used by a country or utility to establish its own national/corporate safety review programme. The guidelines may likewise be used for self-assessment or for establishing a baseline when benchmarking other safety review programmes. This report consists of four parts. Section 2 addresses the planning and preparation of an IAEA assessment mission and Sections 3 and 4 deal with specific guidelines for conducting the assessment mission itself

  13. C-Division annual review and operating plan, August 1990

    Energy Technology Data Exchange (ETDEWEB)

    Morse, N.R.

    1990-11-01

    The Computing and Communications Division is responsible for the Laboratory's Integrated Computing Network as well as Laboratory-wide communications. Our computing network, used by 8000 people distributed throughout the nation, constitutes one of the most powerful scientific computing facilities in the world. The purpose of this publication is to inform our clients of our strategic and operating plans. We review major accomplishments since early 1989 and describe our strategic planning goals and specific projects that will guide our operations over the next couple of years. Our mission statement, planning considerations, and management policies and practices are also included.

  14. Limitations of the inspection and testing concepts for pressurised components from the viewpoint of operating experience

    International Nuclear Information System (INIS)

    Schulz, H.

    2001-01-01

    The role of in-service inspection and testing is to contribute to a safe and reliable operation of systems, structures and components. It is therefore the objective of inspections and tests to identify malfunctions and degradations at a stage early enough to avoid detrimental impacts on safety as well as on the reliability of the plant. Taking mostly the pressure boundary of German light-water reactors as an example, it is the intention of this paper to analyse how successful present inspection and testing requirements are and to discuss limitations. Based on a review of the world-wide operating experience the following questions of a more generic nature are addressed: - Are the relevant damage mechanisms being addressed in our codes and standards? - What are the criteria to develop a representative scope of inspection? - How to maintain a sufficient level of information for a decreasing number of nuclear power plants in operation? It can be concluded that the revision of codes and standards according to lessons learned from operating experience remains as an ongoing process. Furthermore, the criteria applied to derive a representative scope of inspection need to be addressed in more detail, specifically with respect to corrosion. The continuous evaluation of operating experience of a large number of plants is the most valuable source to identify beginning degradations. (author)

  15. EDF/EPRI collaborative program on operator reliability experiments

    International Nuclear Information System (INIS)

    Villemeur, A.; Meslin, T.; Mosneron, F.; Worledge, D.H.; Joksimovich, V.; Spurgin, A.J.

    1988-01-01

    Electricite de France (EDF) and Electric Power Research Institute (EPRI) have been involved in human reliability studies over the last few years, in the context of improvements in human reliability assessment (HRA) methodologies, and have been following a systematic process since 1982 which consists of addressing the following five ingredients: - First, classify human interactions into a limited number of classes. - Second, introduce an acceptable framework to organize the application of HRA to PRA studies. - Third, select approach(es) to quantification. - Fourth, test promising models. - Fifth, establish an appropriate data base for tested model(s) with regard to specific applications. EPRI has just recently completed Phase I of the fourth topic. This primarily focused on testing the fundamental hypotheses behing the human cognitive reliability (HCR) correlation, using power plant simulators. EDF has been carrying out simulator studies since 1980, both for man-machine interface validation and HRA data collection. This background of experience provided a stepping stone for the EPRI project. On the other hand, before 1986, EDF had mainly been concentrating on getting qualitative insights from the tests and lacked experience in quantitative analysis and modeling, while EPRI had made advances in this latter area. Before the EPRI Operator Reliability Experiments (ORE) project was initiated, it was abundantly clear to EPRI and EDF that cooperation between the two could be useful and that both parties could gain from the cooperation

  16. Columbia River System Operation Review final environmental impact statement. Appendix A: River Operation Simulation (ROSE)

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. The River Operation Simulation Experts (ROSE) work group is comprised of representatives of the Corps, BPA, Reclamation, NMFS, Pacific Northwest Utilities Conference Committee (PNUCC), and Northwest Power Planning Council (NPPC). ROSE was responsible for using computer hydroregulation models to simulate the operation of the river system for all of the alternatives evaluated in screening and full scale analysis in SOR. These models are complex computer programs which sequentially route streamflows through each dam in the system, calculating the streamflows, reservoir elevations, spill, power generation and other information at each project and pertinent locations on the river system. ROSE first reviewed specifications of proposed alternatives to determine whether such alternatives were formulated adequately to be run on hydroregulation models

  17. Nuclear power operating experience and technical improvement in Japan

    International Nuclear Information System (INIS)

    Toyota, M.

    1983-01-01

    LWR technology in Japan, originally introduced from the United States of America, is now almost entirely supplied domestically. During the initial stage of plant operation, electric power companies experienced various troubles such as intergranular stress corrosion cracking (IGSCC) in the piping in BWRs and steam generator (S/G) tube leaks in PWRs, which once reduced the capacity factor to about 40%. As a result of efforts to investigate the causes of the troubles and to establish countermeasures, which were applied to the plants in operation and under construction for improvement, as well as to shorten the period of regular inspection and to extend the operation cycle, the capacity factor has been improved to 60% since 1980. In 1975 an LWR improvement and standardization programme was launched to aim at improvement of reliability and availability factor and reduction of occupational radiation exposure with the development of domestic technology based on construction and operating experience. The First Phase Programme, which ran from 1975 to 1977, established countermeasures to preclude these troubles and improved workability by enlargement of the containment vessel. The Second Phase Programme followed and ran until 1981. The major steps taken during this period include the adoption of new IGSCC-resistant material and improved core design for BWRs and the improvement of fuels and S/Gs for PWRs. With these improvements, the capacity factor is now expected to reach a 75% level and occupational radiation exposure should be reduced by 50%. A Third Phase Programme will centre on the test and development programme for advanced BWRs and PWRs now under way to further improve the availability factor and reliability while also minimizing radiation exposure. (author)

  18. Lessons learned from operating experience, maintenance procedures and training measures

    International Nuclear Information System (INIS)

    Guttner, K.; Gronau, D.

    2003-01-01

    Training programmes for nuclear facility personnel as a result of the developing phase of SAT have to be approved in the subsequent implementation and evaluation phases with the consequence of several feedback activities in the whole training process. The effectiveness of this procedure has to be evaluated especially with respect to an improvement of safety culture, shorter outage times or better plant performance, resulting in a smaller number of incidents due to human failures. The first two arguments are directly connected with all types of maintenance work in a nuclear power plant and the related preparatory training measures. The reduction of incidents due to human failures is the result of different influences, i.e. training of the operational as well as of the maintenance personnel together with changes of the operating procedures or system design. Though an evaluation of the training process should always be based on a clear definition of criteria by which the fulfilment of the learning objectives can be measured directly, the real effectiveness of training is proven by the behaviour and attitude of the personnel which can only be taken from indirect indicators. This is discussed in more detail for some examples being partly related to the above mentioned arguments. An excellent plant performance, representing a general objective of all activities, can be analysed by the changed number and reasons of incidents in a plant during its operation time. Two further examples are taken from the reactor service field where there is a tendency to reduce the individual dose rates by changed devices and/or procedures as an output from training experience with mockups. Finally the rationalisation of refresher training for operational personnel by the use of interactive teaching programs (Computer Based Training - CBT) is presented which integrate learning objectives together with a test module. (author)

  19. Sonography of the painful shoulder: role of the operator's experience

    International Nuclear Information System (INIS)

    Corroller, Thomas Le; Cohen, Michel; Champsaur, Pierre; Aswad, Richard; Pauly, Vanessa

    2008-01-01

    The aim of our study was to determine the role of the operator's experience in the sonographic evaluation of the painful shoulder and to validate assumptions about its technical performance in routine practice. Two radiologists, respectively standard and expert sonographic operators, independently and prospectively scanned 65 patients with clinical suspicion of rotator cuff lesion. Magnetic resonance arthrography was the reference standard. The sensitivity of the expert ultrasound operator was 95.3% for full-thickness rotator cuff tears (41/43), 70.6% for partial-thickness tears (12/17), 64.3% for intratendinous tears (9/14), 100% for abnormality of the long head of biceps tendon (seven of seven), 88.9% for supraspinatus tendinosis (16/18), 96.4% for subacromial bursa abnormalities (53/55), and 91.7%for acromioclavicular joint osteoarthritis (33/36). The two sonographic operators were in very good agreement about full-thickness rotator cuff tears (κ=0.90), supraspinatus tendinosis (κ =0.80), abnormalities of the long head of biceps tendon (κ=0.84), subacromial bursa abnormalities (κ=0.89), and acromioclavicular osteoarthritis (κ=0.81). The agreement was only moderate for partial-thickness tears (κ=0.63) and intratendinous tears (κ=0.57). Our results show that in moderately experienced hands as in experts' hands, sonography has a low level of interobserver variability for full-thickness rotator cuff tears. Considering partial-thickness and intratendinous rotator cuff tears, our data suggest that interobserver variability is higher. (orig.)

  20. BWR and PWR chemistry operating experience and perspectives

    International Nuclear Information System (INIS)

    Fruzzetti, K.; Garcia, S.; Lynch, N.; Reid, R.

    2014-01-01

    It is well recognized that proper control of water chemistry plays a critical role in ensuring the safe and reliable operation of Boiling Water Reactors (BWRs) and Pressurized Water Reactors (PWRs). State-of-the-art water chemistry programs reduce general and localized corrosion of reactor coolant system, steam cycle equipment, and fuel cladding materials; ensure continued integrity of cycle components; and reduce radiation fields. Once a particular nuclear plant component has been installed or plant system constructed, proper water chemistry provides a global tool to mitigate materials degradation problems, thereby reducing the need for costly repairs or replacements. Recognizing the importance of proper chemistry control and the value in understanding the relationship between chemistry guidance and actual operating experience, EPRI continues to collect, monitor, and evaluate operating data from BWRs and PWRs around the world. More than 900 cycles of valuable BWR and PWR operating chemistry data has been collected, including online, startup and shutdown chemistry data over more than 10 years (> 20 years for BWRs). This paper will provide an overview of current trends in BWR and PWR chemistry, focusing on plants in the U.S.. Important chemistry parameters will be highlighted and discussed in the context of the EPRI Water Chemistry Guidelines requirements (i.e., those parameters considered to be of key importance as related to the major goals identified in the EPRI Guidelines: materials integrity; fuel integrity; and minimizing plant radiation fields). Perspectives will be provided in light of recent industry initiatives and changes in the EPRI BWR and PWR Water Chemistry Guidelines. (author)

  1. Transferring Knowledge from Building Operation to Design: A literature review

    DEFF Research Database (Denmark)

    Rasmussen, Helle Lohmann; Jensen, Per Anker; Gregg, Jay Sterling

    . Knowing that the list lacks inputs from cultural and organizational theory, the paper suggests that further research should focus on taking these suggestions to an operational level for the benefit of FM, building clients and design teams. Furthermore, it is found that major concepts that could......As a solution to the previously identified gap between expected and actual building performance, this paper investigates how knowledge can be transferred from operation to design. This is assumed to help bridge the gap and increase the performance of new built facilities. By conducting a systematic...... literature review, it is found, that the theoretical approach in the reviewed articles has a significant impact on the level of how applicable the recommendations are in practice. Furthermore, a list of identified tools to enable knowledge transfer is provided, including POE, PPP and building commissioning...

  2. LANL operating experience with the WAND and HERCULES prototype systems

    International Nuclear Information System (INIS)

    Gruetzmacher, K. M.; Foxx, C. L.; MYERS, S. C.

    2000-01-01

    The Waste Assay for Nonradioactive Disposal (WAND) and the High Efficiency Radiation Counters for Ultimate Low Emission Sensitivity (HERCULES) prototype systems have been operating at Los Alamos National Laboratory's (LANL's) Solid Waste Operation's (SWO'S) non-destructive assay (NDA) building since 1997 and 1998, respectively. These systems are the cornerstone of the verification program for low-density Green is Clean (GIC) waste at the Laboratory. GIC waste includes all non-regulated waste generated in radiological controlled areas (RCAS) that has been actively segregated as clean (i.e., nonradioactive) through the use of waste generator acceptable knowledge (AK). The use of this methodology alters LANL's past practice of disposing of all room trash generated in nuclear facilities in radioactive waste landfills. Waste that is verified clean can be disposed of at the Los Alamos County Landfill. It is estimated that 50-90% of the low-density room trash from radioactive material handling areas at Los Alamos might be free of contamination. This approach avoids the high cost of disposal of clean waste at a radioactive waste landfill. It also reduces consumption of precious space in the radioactive waste landfill where disposal of this waste provides no benefit to the public or the environment. Preserving low level waste (LLW) disposal capacity for truly radioactive waste is critical in this era when expanding existing radioactive waste landfills or permitting new ones is resisted by regulators and stakeholders. This paper describes the operating experience with the WAND and HERCULES since they began operation at SWO. Waste for verification by the WAND system has been limited so far to waste from the Plutonium Facility and the Solid Waste Operations Facility. A total of461 ft3 (13.1 m3) of low-density shredded waste and paper have been verified clean by the WAND system. The HERCULES system has been used to verify waste from four Laboratory facilities. These are the

  3. The reliability of structural systems operating at high temperature: Replacing engineering judgement with operational experience

    International Nuclear Information System (INIS)

    Chevalier, M.J.; Smith, D.J.; Dean, D.W.

    2012-01-01

    Deterministic assessments are used to assess the integrity of structural systems operating at high temperature by providing a lower bound lifetime prediction, requiring considerable engineering judgement. However such a result may not satisfy the structural integrity assessment purpose if the results are overly conservative or conversely plant observations (such as failures) could undermine the assessment result if observed before the lower bound lifetime. This paper develops a reliability methodology for high temperature assessments and illustrates the impact and importance of managing the uncertainties within such an analysis. This is done by separating uncertainties into three classifications; aleatory uncertainty, quantifiable epistemic uncertainty and unquantifiable epistemic uncertainty. The result is a reliability model that can predict the behaviour of a structural system based upon plant observations, including failure and survival data. This can be used to reduce the over reliance upon engineering judgement which is prevalent in deterministic assessments. Highlights: ► Deterministic assessments are shown to be heavily reliant upon engineering judgment. ► Based upon the R5 procedure, a reliability model for a structural system is developed. ► Variables must be classified as either aleatory or epistemic to model their impact on reliability. ► Operation experience is then used to reduce reliance upon engineering judgment. ► This results in a model which can predict system behaviour and learn from operational experience.

  4. [Review of experiments measuring CP nonconservation

    International Nuclear Information System (INIS)

    Gollin, G.D.

    1985-08-01

    Recent experiments setting limits on the magnitude of the ratio of two CP nonconservation parameters epsilon'/epsilon are discussed. Gauge theory calculations suggest that epsilon'/epsilon > .005, somewhat at odds with the results epsilon'/epsilon = -.0046 +- .0058 from a Chicago-Saclay measurement and epsilon'/epsilon = .0017 +- .0082 from a Yale-BNL experiment. 9 refs., 5 figs., 2 tabs

  5. Mortuary operations following mass fatality natural disasters: a review.

    Science.gov (United States)

    Anderson, Madelyn; Leditschke, Jodie; Bassed, Richard; Cordner, Stephen M; Drummer, Olaf H

    2017-03-01

    This is a critical review to discuss the best practice approaches to mortuary operations in preparation for and the response to natural, mass fatality, disaster events, as identified by a review of published articles. The Preferred Reporting Items for Systematic Reviews and Meta-Analysis Protocols (PRISMA-P) Statement guided the identification of potential articles to use in this critical review. Subsequent searches were also conducted to identify articles relating to heat wave, and flood mortality. All identified peer-reviewed studies published in English which discussed the preparation and response of mortuaries to mass fatality natural disasters occurring in developed countries were included. Using the PRISMA-P method of identifying articles, 18 articles were selected for inclusion in this review. Although there are numerous articles which describe the mortuary response to mass fatality incidents, few articles analyzed the response, or discussed the roles which supported and enabled the organization to undertake the task of identifying disaster victims. It is thus difficult to determine objectively if the actions and activities outlined in the articles represent best-practice.

  6. VVER operational experience - effect of preconditioning and primary water chemistry on radioactivity build-up

    International Nuclear Information System (INIS)

    Zmitko, M.; Kysela, J.; Dudjakova, K.; Martykan, M.; Janesik, J.; Hanus, V.; Marcinsky, P.

    2004-01-01

    The primary coolant technology approaches currently used in VVER units are reviewed and compared with those used in PWR units. Standard and modified water chemistries differing in boron-potassium control are discussed. Preparation of the VVER Primary Water Chemistry Guidelines in the Czech Republic is noted. Operational experience of some VVER units, operated in the Czech Republic and Slovakia, in the field of the primary water chemistry, and radioactivity transport and build-up are presented. In Mochovce and Temelin units, a surface preconditioning (passivation) procedure has been applied during hot functional tests. The main principles of the controlled primary water chemistry applied during the hot functional tests are reviewed and importance of the water chemistry, technological and other relevant parameters is stressed regarding to the quality of the passive layer formed on the primary system surfaces. The first operational experience obtained in the course of beginning of these units operation is presented mainly with respect to the corrosion products coolant and surface activities. Effect of the initial passivation performed during hot functional tests and the primary water chemistry on corrosion products radioactivity level and radiation situation is discussed. (author)

  7. Experience from construction and operation of Karachi nuclear power plant

    International Nuclear Information System (INIS)

    Zaidi, S.M.N.

    1977-01-01

    Pakistan's first nuclear power plant (KANUPP) is owned and operated by the Pakistan Atomic Energy Commission (PAEC). It uses a heavy water moderated and cooled natural uranium fuelled reactor. Total installed capacity is 137 MW(e). It was designed, constructed and commissioned by Canadian General Electric Co. Ltd. (CGE) as Prime Contractor. Construction started in mid-1966 and was completed in mid 1970; commissioning started in early 1970 and was completed at the end of 1972. Intensive on-the-job training for 20 engineers and 15 operators was provided by CGE in Canada. Ten engineers also worked in CGE's design offices. With this key group of engineers and technicians PAEC had no difficulty in taking over the plant from CGE after completion. The construction of the plant in a developing country presented special problems to CGE. The relatively small local construction firms had limited experience and equipment. Construction plant, equipment and tools were scarce. Fabrication and workshop facilities of limited scope were available but their quotations were relatively high. A scarcity of engineering, technical and skilled manpower for the construction of the project left as the only alternative on-site training for carefully recruited technicians. The results were most gratifying and compared favourably with CGE's Canadian experience. Welding, pipe fitting, tubing work and electrical connections were excellent. The local staff's productivity and dedication were very good. In the commissioning period, PAEC and CGE engineers and technicians worked as one team, testing and debugging the equipment and systems and demonstrating the contractual performance warranties. This period extended to approximately three years due to many technical problems resulting from equipment failures, environmental problems, system problems, plant loading limitations in view of the relatively small size of the grid system and special requirement of fuel conditioning to avoid premature fuel

  8. Best practices in identifying, reporting and screening operating experience at nuclear power plants

    International Nuclear Information System (INIS)

    2008-03-01

    IAEA Safety Standards Series No. SF-1 entitled Fundamental Safety Principles: Safety Fundamentals states the need for operating organizations to establish a programme for the collection and analysis of operating experience in nuclear power plants. Such a programme ensures that operating experience is analysed, events important to safety are reviewed in depth, lessons learned are disseminated to the staff of the organization and to relevant national and international organizations, and corrective actions are effectively implemented. This publication has been developed to provide advice and assistance to nuclear installations, and related institutions including contractors and support organizations to strengthen and enhance their own feedback process through the implementation of best practices in identifying, reporting and screening processes and to assess the effectiveness of the above areas. To support a proactive safety management approach the nuclear installations are enhancing the operating experience feedback (OEF) processes. For this purpose, the nuclear industry is striving to collect more information on occurrences that are useful to address the early signs of declining performance and improve operational safety performance. In this environment a strong reporting culture that motivates people to identify and report issues is an important attribute. As a consequence, the number and diversity of issues identified increases, and there is a need to set thresholds of screening for further treatment. Thus, the establishment of an effective identification, reporting and screening process is very beneficial to streamline the efforts, and ensure that major incidents and latent weaknesses are being addressed and that operating experience is treated according to its significance. This leads to improved safety and production. This publication was written to complement the publication IAEA Services Series No. 10 - PROSPER Guidelines - Guidelines for Peer Review and for

  9. Operational experience with Dragon reactor experiment of relevance to commercial reactors

    International Nuclear Information System (INIS)

    Capp, P.D.; Simon, R.A.

    1976-01-01

    An important part of the experience gained during the first ten years of successful power operation of the Dragon Reactor is relevant to the design and operation of future High Temperature Reactors (HTRs). The aspects presented in this paper have been chosen as being particularly applicable to larger HTR systems. Core performance under a variety of conditions is surveyed with particular emphasis on a technique developed for the identification and location of unpurged releasing fuel and the presence of activation and fission products in the core area. The lessons learned during the reflector block replacement are presented. Operating experience with the primary circuit identifies the lack of mixing of gas streams within the hot plenum and the problems of gas streaming in ducts. Helium leakage from the circuit is often greater than the optimum 0.1%/d. Virtually all the leakage problems are associated with the small bore instrument pipework essential for the many experiments associated with the Dragon Reactor Experiment (DRE). Primary circuit maintenance work confirms the generally clean state of the DRE circuit but identifies 137 Cs and 110 Agsup(m) as possible hazards if fuel emitting these isotopes is irradiated. (author)

  10. Operational experience feedback in the World Association of Nuclear Operators (WANO)

    International Nuclear Information System (INIS)

    Revuelta, Ramon

    2004-01-01

    Operators in high-risk industries need to be learning organisations, learning from themselves and from the others. This presentation will describe how the nuclear industry is dealing in an integrated manner with the feedback of operating experience (OE), both internal and external, to increase the safety and reliability of power plants; it will describe how it: - investigates events; - reports events and analyses trends; - shares information to prevent recurrence; - performs corrective action and training; - performs assessments to verify effectiveness. The plants have achieved great improvements in performance overall, and to improve further, the industry is evolving. Instead of just learning from past events (reactive) it is now focusing on lower level indications of problems (precursors) through low level events reporting, trending and analysis. A hallmark of the industry is its desire to be self-critical. Emphasis is placed on improving the bottom quartile performing plants

  11. Mechanic- and hydraulic shock-absorbers - layout, construction, operation experience

    International Nuclear Information System (INIS)

    Kluge, M.

    1981-01-01

    The problem lies in the protection of the flexible supported power plant components against undesired sudden movements. Various shock absorbing systems are at disposal in this case: Mechanical and hydraulic shock absorbers, whose functioning systems are shown in figures. The operation experience showed a series of deficiencies, as demonstrated on various figures. In order to avoid them, some important recommendations are given. Requirements and layout are demonstrated according to todays' state-of-the-art. The admissible stresses, resulting from the summary of various specifications for the analytical evidence will be described. Development and construction will be explained in detail by means of pictures with cross sections of original shock absorbers. Todays' construction characteristics will be summarized. The final remark includes a request for generally valid guidelines. (orig.) [de

  12. Operating experience with ion exchanger beds in CIRUS

    International Nuclear Information System (INIS)

    Acharya, V.N.; Hajra, P.

    1977-01-01

    Operating experience with the ion exchanger beds in CIRUS reactor is narrated. Ion exchangers are provided for demineralisation of make up water and purification of closed loop water circuits. Exhaustion of resin is assessed on the basis of CO 2 concentration in the helium vent gas of the heavy water system. It is recommended that valves in the resin columns for rod handling bays be located outside the enclosure and each bed to reduce man-rem consumption during maintenance. Repeated backwash of the bed reduces chocking of water space with resin fines. Preventive maintenance avoids leakage past valves. Active resin from the resin beds is removed by hydraulic transfer method. (M.G.B.)

  13. Operating experience of the EBR-II steam generating system

    International Nuclear Information System (INIS)

    Buschman, H.W.; Penney, W.H.; Quilici, M.D.; Radtke, W.H.

    1981-01-01

    The Experimental Breeder Reactor II (EBR-II) is a Liquid Metal Fast Breeder Reactor (LMFBR) with integrated power producing capability. Superheated steam is produced by eight natural circulation evaporators, two superheaters, and a conventional steam drum. Steam throttle conditions are 438 C (820 F) and 8.62 MPa (1250 psi). The designs of the evaporators and superheaters are essentially identical; both are counterflow units with low pressure nonradioactive sodium on the shell side. Safety and reliability are maximized by using duplex tubes and tubesheets. The performance of the system has been excellent and essentially trouble free. The operating experience of EBR-II provides confidence that the technology can be applied to commercial LMFBR's for an abundant supply of energy for the future. 5 refs

  14. Operational experience of the fuel cleaning facility of Joyo

    International Nuclear Information System (INIS)

    Mukaibo, R.; Matsuno, Y.; Sato, I.; Yoneda, Y.; Ito, H.

    1978-01-01

    Spent fuel assemblies in 'Joyo', after they are taken out of the core, are taken to the Fuel Cleaning Facility in the reactor service building and sodium removal is done. The cleaning process is done by cooling the assembly with argon gas, steam charging and rinsing by demineralized water. Deposited sodium was 50 ∼ 60 g per assembly. The sodium and steam reaction takes about 15 minutes to end and the total time the fuel is placed in the pot is about an hour. The total number of assemblies cleaned in the facility was 95 as of November 1977. In this report the operational experience together with discussions of future improvements are given. (author)

  15. Operational Experience from LCLS-II Cryomodule Testing

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Renzhuo [Fermilab; Hansen, Benjamin [Fermilab; White, Michael [Fermilab; Hurd, Joseph [Fermilab; Atassi, Omar Al [Fermilab; Bossert, Richard [Fermilab; Pei, Liujin [Fermilab; Klebaner, Arkadiy [Fermilab; Makara, Jerry [Fermilab; Theilacker, Jay [Fermilab; Kaluzny, Joshua [Fermilab; Wu, Genfa [Fermilab; Harms, Elvin [Fermilab

    2017-07-01

    This paper describes the initial operational experience gained from testing Linac Coherent Light Source II (LCLS-II) cryomodules at Fermilab’s Cryomodule Test Facility (CMTF). Strategies for a controlled slow cooldown to 100 K and a fast cooldown past the niobium superconducting transition temperature of 9.2 K will be described. The test stand for the cryomodules at CMTF is sloped to match gradient in the LCLS-II tunnel at Stanford Linear Accelerator (SLAC) laboratory, which adds an additional challenge to stable liquid level control. Control valve regulation, Superconducting Radio-Frequency (SRF) power compensation, and other methods of stabilizing liquid level and pressure in the cryomodule 2.0 K SRF cavity circuit will be discussed. Several different pumping configurations using cold compressors and warm vacuum pumps have been used on the cryomodule 2.0 K return line and the associated results will be described.

  16. Operational experience from LCLS-II cryomodule testing

    Science.gov (United States)

    Wang, R.; Hansen, B.; White, M.; Hurd, J.; Atassi, O. Al; Bossert, R.; Pei, L.; Klebaner, A.; Makara, J.; Theilacker, J.; Kaluzny, J.; Wu, G.; Harms, E.

    2017-12-01

    This paper describes the initial operational experience gained from testing Linac Coherent Light Source II (LCLS-II) cryomodules at Fermilab’s Cryomodule Test Facility (CMTF). Strategies for a controlled slow cooldown to 100 K and a fast cooldown past the niobium superconducting transition temperature of 9.2 K will be described. The test stand for the cryomodules at CMTF is sloped to match gradient in the LCLS-II tunnel at Stanford Linear Accelerator (SLAC) laboratory, which adds an additional challenge to stable liquid level control. Control valve regulation, Superconducting Radio-Frequency (SRF) power compensation, and other methods of stabilizing liquid level and pressure in the cryomodule 2.0 K SRF cavity circuit will be discussed. Several different pumping configurations using cold compressors and warm vacuum pumps have been used on the cryomodule 2.0 K return line and the associated results will be described.

  17. Experiments simulation and design to set traffic lights operation rules

    Energy Technology Data Exchange (ETDEWEB)

    Jimenez Garcia, J.A.

    2016-07-01

    In this paper it is used the experimental design to minimize the travel time of motor vehicles, in one of the most important avenues of Celaya City in Guanajuato, Mexico, by means of optimal synchronization of existing traffic lights. In the optimization process three factors are considered: the traffic lights’ cycle times, the synchrony defined as stepped, parallel and actual, and speed limit, each one with 3 evaluation levels. The response variables to consider are: motor vehicles’ travel time, fuel consumption and greenhouse effect gas (CO2) emissions. The different experiments are performed using the simulation model developed in the PTV-VISSIM software, which represents the vehicle traffic system. The obtained results for the different proposed scenarios allow to find proper levels at which the vehicle traffic system must be operated in order to improve mobility, to reduce contamination rates and decrease the fuel consumption for the different motor vehicles that use the avenue. (Author)

  18. Operational experience of the fuel cleaning facility of Joyo

    Energy Technology Data Exchange (ETDEWEB)

    Mukaibo, R; Matsuno, Y; Sato, I; Yoneda, Y; Ito, H [O-arai Engineering Centre, PNC, Ibaraki-ken, Tokio (Japan)

    1978-08-01

    Spent fuel assemblies in 'Joyo', after they are taken out of the core, are taken to the Fuel Cleaning Facility in the reactor service building and sodium removal is done. The cleaning process is done by cooling the assembly with argon gas, steam charging and rinsing by demineralized water. Deposited sodium was 50 {approx} 60 g per assembly. The sodium and steam reaction takes about 15 minutes to end and the total time the fuel is placed in the pot is about an hour. The total number of assemblies cleaned in the facility was 95 as of November 1977. In this report the operational experience together with discussions of future improvements are given. (author)

  19. Savannah River Site Operating Experience with Transuranic (TRU) Waste Retrieval

    International Nuclear Information System (INIS)

    Stone, K.A.; Milner, T.N.

    2006-01-01

    Drums of TRU Waste have been stored at the Savannah River Site (SRS) on concrete pads from the 1970's through the 1980's. These drums were subsequently covered with tarpaulins and then mounded over with dirt. Between 1996 and 2000 SRS ran a successful retrieval campaign and removed some 8,800 drums, which were then available for venting and characterization for WIPP disposal. Additionally, a number of TRU Waste drums, which were higher in activity, were stored in concrete culverts, as required by the Safety Analysis for the Facility. Retrieval of drums from these culverts has been ongoing since 2002. This paper will describe the operating experience and lessons learned from the SRS retrieval activities. (authors)

  20. Operational experience of stainless steels in seawater-cooled systems

    International Nuclear Information System (INIS)

    Henriksson, S.

    1981-06-01

    A study has been made of chiefly Swedish and Finnish operational experience of stainless steel in seawater and brackish water. A report is given on 23 typical cases, behind which in actual fact a considerably larger number of individual practical cases are concealed. The answer to the primary question why a standard steel of type SS 2343 (AISI 316) sometimes, contrary to expectation, remains unattacked by local corrosion is that there is usually spontaneous cathodic protection by other less noble components of carbon steel, cast iron or some copper alloy in direct contact with the stainless steel. The study confirms in other respects the adverse effect of residual oxides after welding and the beneficial of low temperature, high continuous waterflow and periodic cleaning, and of rinsing with fresh water during out-of service periods. It also verifies the additional advantages of the new high-alloy special steels which have begun to be marketed in recent years for seawater applications. (author)

  1. Design and operational experience with a portable tritium cleanup system

    International Nuclear Information System (INIS)

    Maienschein, J.L.; Wilson, S.W.; Garcia, F.

    1991-06-01

    We built a portable tritium cleanup system to scavenge tritium from contaminated gases in any tritium-containing system in the LLNL Tritium Facility. The cleanup system uses standard catalytic oxidation of tritium to water followed by water removal with a molecular sieve dryer. The cleanup unit, complete with instrumentation, is contained in a portable cart that is rolled into place and connected to the apparatus to be cleaned. The cleanup systems is effective, low-tech, simple, and reliable. The nominal flow rate of the system is 30 liters/minute, and the decontamination factor is > 1000. In this paper we will show design information on our portable cleanup system, and will discuss our operational experience with it over the past several years

  2. U-2g0 cyclotron operational experience and improvement

    International Nuclear Information System (INIS)

    Gigal, B.N.; Gul'bekyan, G.G.; Kozlov, S.I.; Oganesyan, R.Ts.

    1983-01-01

    Brief description of main syste's of the U-200 isochronous 2-m cyclotron put into opera ion in 1968 is given and its operational characteristics a e presented. The cyclotron is used for conducting inve tigations in the field of nuclear physics. Ions from d uterium to argon have been accelerated in the cyclotro'. Annual time of target irradiation constitutes 2000-4000. The specific features of the cyclotron are: high l vel of a magnetic field (of about 20 kOe), possibili y of acceleration of ions with different mass-to-charge ratio a low correcting winding power, simple and high-e fective beam extraction by the method of charge exchange on a thin target allowing to vary smoothly energy of extracted ons. An experience in the U-200 cyclotron development and o eration is used as the basis for designing and choosing basic parameters of the U-200P, U-250, U-400 heavy ion cyclotrons

  3. Experiment of a centrifugal pump during changing speed operation

    International Nuclear Information System (INIS)

    Yuan, H J; Wu, Y L; Liu, S H; Shao, J

    2012-01-01

    In this paper, a method of changing rotational speed of impeller periodically as the pulsatile working condition is developed to realize pulse outputs both of flow discharge and of head for a centrifugal pump through experiment. The performance of the centrifugal pump under pulsatile working operation condition is measured which indicates this model pump could produce desired pulse flow under such condition. Flow patterns at four testing points under pulsatile conditions are obtained by means of the particle image velocimetry (PIV) technology both with laser induced fluorescence (LIF) particles and refractive index matched (RIM) fluid. Results of PIV measurement show the distributions of velocity, streamlines, and the principal Reynolds normal stress (PRNS). Under the design flow rate condition, the relative velocity in the blade channel distributes smoothly and decreases from inlet to exit. And at the impeller exit, the relative velocity is lower close to suction side than that near pressure side of blade in most of blade channels.

  4. Operating System Concepts for Reconfigurable Computing: Review and Survey

    Directory of Open Access Journals (Sweden)

    Marcel Eckert

    2016-01-01

    Full Text Available One of the key future challenges for reconfigurable computing is to enable higher design productivity and a more easy way to use reconfigurable computing systems for users that are unfamiliar with the underlying concepts. One way of doing this is to provide standardization and abstraction, usually supported and enforced by an operating system. This article gives historical review and a summary on ideas and key concepts to include reconfigurable computing aspects in operating systems. The article also presents an overview on published and available operating systems targeting the area of reconfigurable computing. The purpose of this article is to identify and summarize common patterns among those systems that can be seen as de facto standard. Furthermore, open problems, not covered by these already available systems, are identified.

  5. MOX and UOX PWR fuel performances EDF operating experience

    International Nuclear Information System (INIS)

    Provost, Jean-Luc; Debes, Michel

    2005-01-01

    Based on a large program of experimentations implemented during the 90s, the industrial achievement of new FAs designs with increased performances opens up new prospects. The currently UOX fuels used on the 58 EDF PWR units are now authorized up to a maximum FA burn-up of 52 GWd/t with a large experience from 45 to 50 GWd/t. Today, the new products, along with the progress made in the field of calculation methods, still enable to increase further the fuel performances with respect to the safety margins. Thus, the conditions are met to implement in the next years new fuel managements on each NPPs series of the EDF fleet with increased enrichment (up to 4.5%) and irradiation limits (up to 62 GWd/t). The recycling of plutonium is part of EDF's reprocessing/recycling strategy. Up to now, 20 PWR 900 MW reactors are managed in MOX hybrid management. The feedback experience of 18 years of PWR operation with MOX is satisfactory, without any specific problem regarding manoeuvrability or plant availability. EDF is now looking to introduce MOX fuels with a higher plutonium content (up to 8.6%) equivalent to natural uranium enriched to 3.7%. It is the goal of the MOX Parity core management which achieve balance of MOX and UOX fuel performance with a significant increase of the MOX average discharge burn-up (BU max: 52 GWd/t for MOX and UOX). The industrial maturity of new FAs designs, with increased performances, allows the implementation in the next years of new fuel managements on each NPPs series of the EDF fleet. The scheduling of the implementation of the new fuel managements on the PWRs fleet is a great challenge for EDF, with important stakes: the nuclear KWh cost decrease with the improvement of the plant operation performance. (author)

  6. Operating experience and radiation protection in RAPS-3 and 4 operations

    International Nuclear Information System (INIS)

    Khandelwal, Narendra; Dhakar, P.C.; Singh, G.K.; Gupta, Ashok

    2008-01-01

    Rajasthan Atomic Power Station (RAPS)-3 and 4 was designed and constructed using latest technological advancements in the field of nuclear energy. Operating experience of the station have taught many lessons and provided opportunities to take proactive corrective actions. Design modifications, effective implementation of radiological surveillance program and improvements in work culture have helped in achieving continual reduction in radiation exposures and effluent releases at the station. This paper discusses some of the modifications carried out at the station along with their radiological impacts. (author)

  7. Operational Experience with the ATLAS Pixel Detector at LHC

    CERN Document Server

    Keil, M

    2013-01-01

    The ATLAS Pixel Detector is the innermost detector of the ATLAS experiment at the Large Hadron Collider at CERN, providing high-resolution measurements of charged particle tracks in the high radiation environment close to the collision region. This capability is vital for the identification and measurement of proper decay times of long-lived particles such as b-hadrons, and thus crucial for the ATLAS physics program. The detector provides hermetic coverage with three cylindrical layers and three layers of forward and backward pixel detectors. It consists of approximately 80 million pixels that are individually read out via front-end chips bump-bonded to 1744 n-on-n silicon substrates. In this paper results from the successful operation of the Pixel Detector at the LHC will be presented, including calibration procedures, detector performance and measurements of radiation damage. The detector performance is excellent: more than 95% of the pixels are operational, noise occupancy and hit efficiency exceed the des...

  8. Primary water chemistry of VVERs-operating experience

    International Nuclear Information System (INIS)

    Kysela, Jan; Zmitko, Milan; Petrecky, Igor

    1998-01-01

    VVER units are operated in mixed boron-potassium-ammonia water chemistry. Several modifications of the water chemistry, differing in boron-potassium co-ordination and in the way how hydrogen concentration is produced and maintain in the coolant, is used. From the operational experience point of view VVER units do not show any significant problems connected with the primary coolant chemistry. The latest results indicate that dose rate levels are slowly returning to the former ones. An improvement of the radiation situation observed last two years is supported by the surface activity measurements. However, the final conclusion on the radiation situation can be made only after evaluation of the several following cycles. Further investigation is also needed to clarify a possible effect of modified water chemistry and shut-down chemistry on radioactivity build-up and dose rate level at Dukovany units. Structure materials composition has a significant effect on radiation situation in the units. It concerns mainly of cobalt content in SG material. There is no clear evidence of possible effect of the SG shut-down regimes on the radiation situation in the units even if the dose rate and surface activity data show wide spread for the individual reactor loops. (S.Y.)

  9. Experiment operations plan for the MT-4 experiment in the NRU reactor

    International Nuclear Information System (INIS)

    Russcher, G.E.; Wilson, C.L.; Parchen, L.J.; Marshall, R.K.; Hesson, G.M.; Webb, B.J.; Freshley, M.D.

    1983-06-01

    A series of thermal-hydraulic and cladding materials deformation experiments were conducted using light-water reactor fuel bundles as part of the Pacific Northwest Laboratory Loss-of-Coolant Accident (LOCA) Simulation Program. This report is the formal operations plan for MT-4 - the fourth materials deformation experiment conducted in the National Research Universal (NRU) reactor, Chalk River, Ontario, Canada. A major objective of MT-4 was to simulate a pressurized water reactor LOCA that could induce fuel rod cladding deformation and rupture due to a short-term adiabatic transient and a peak fuel cladding temperature of 1200K (1700 0 F)

  10. Operational Experience with the Frontier System in CMS

    International Nuclear Information System (INIS)

    Blumenfeld, Barry; Dykstra, Dave; Kreuzer, Peter; Du Ran; Wang Weizhen

    2012-01-01

    The Frontier framework is used in the CMS experiment at the LHC to deliver conditions data to processing clients worldwide, including calibration, alignment, and configuration information. Each central server at CERN, called a Frontier Launchpad, uses tomcat as a servlet container to establish the communication between clients and the central Oracle database. HTTP-proxy Squid servers, located close to clients, cache the responses to queries in order to provide high performance data access and to reduce the load on the central Oracle database. Each Frontier Launchpad also has its own reverse-proxy Squid for caching. The three central servers have been delivering about 5 million responses every day since the LHC startup, containing about 40 GB data in total, to more than one hundred Squid servers located worldwide, with an average response time on the order of 10 milliseconds. The Squid caches deployed worldwide process many more requests per day, over 700 million, and deliver over 40 TB of data. Several monitoring tools of the tomcat log files, the accesses of the Squids on the central Launchpad servers, and the availability of remote Squids have been developed to guarantee the performance of the service and make the system easily maintainable. Following a brief introduction of the Frontier framework, we describe the performance of this highly reliable and stable system, detail monitoring concerns and their deployment, and discuss the overall operational experience from the first two years of LHC data-taking.

  11. Operational experience with the CMS Data Acquisition System

    CERN Multimedia

    CERN. Geneva

    2012-01-01

    The data-acquisition (DAQ) system of the CMS experiment at the LHC performs the read-out and assembly of events accepted by the first level hardware trigger. Assembled events are made available to the high-level trigger (HLT), which selects interesting events for offline storage and analysis. The system is designed to handle a maximum input rate of 100 kHz and an aggregated throughput of 100 GB/s originating from approximately 500 sources and 10^8 electronic channels. An overview of the architecture and design of the hardware and software of the DAQ system is given. We report on the performance and operational experience of the DAQ and its Run Control System in the first two years of collider run of the LHC, both in proton-proton and Pb-Pb collisions. We present an analysis of the current performance, its limitations, and the most common failure modes and discuss the ongoing evolution of the HLT capability needed to match the luminosity ramp-up of the LHC.

  12. Variability in Resident Operative Hand Experience by Specialty.

    Science.gov (United States)

    Silvestre, Jason; Lin, Ines C; Levin, L Scott; Chang, Benjamin

    2018-01-01

    Recent attention has sought to standardize hand surgery training in the United States. This study analyzes the variability in operative hand experience for orthopedic and general surgery residents. Case logs for orthopedic and general surgery residency graduates were obtained from the American Council of Graduate Medical Education (2006-2007 to 2014-2015). Plastic surgery case logs were not available for comparison. Hand surgery case volumes were compared between specialties with parametric tests. Intraspecialty variation in orthopedic surgery was assessed between the bottom and top 10th percentiles in procedure categories. Case logs for 9605 general surgery residents and 5911 orthopedic surgery residents were analyzed. Orthopedic surgery residents performed a greater number of hand surgery cases than general surgery residents ( P < .001). Mean total hand experience ranged from 2.5 ± 4 to 2.8 ± 5 procedures for general surgery residents with no reported cases of soft tissue repairs, vascular repairs, and replants. Significant intraspecialty variation existed in orthopedic surgery for all hand procedure categories (range, 3.3-15.0). As the model for hand surgery training evolves, general surgeons may represent an underutilized talent pool to meet the critical demand for hand surgeon specialists. Future research is needed to determine acceptable levels of training variability in hand surgery.

  13. Operational Experience with the Frontier System in CMS

    Science.gov (United States)

    Blumenfeld, Barry; Dykstra, Dave; Kreuzer, Peter; Du, Ran; Wang, Weizhen

    2012-12-01

    The Frontier framework is used in the CMS experiment at the LHC to deliver conditions data to processing clients worldwide, including calibration, alignment, and configuration information. Each central server at CERN, called a Frontier Launchpad, uses tomcat as a servlet container to establish the communication between clients and the central Oracle database. HTTP-proxy Squid servers, located close to clients, cache the responses to queries in order to provide high performance data access and to reduce the load on the central Oracle database. Each Frontier Launchpad also has its own reverse-proxy Squid for caching. The three central servers have been delivering about 5 million responses every day since the LHC startup, containing about 40 GB data in total, to more than one hundred Squid servers located worldwide, with an average response time on the order of 10 milliseconds. The Squid caches deployed worldwide process many more requests per day, over 700 million, and deliver over 40 TB of data. Several monitoring tools of the tomcat log files, the accesses of the Squids on the central Launchpad servers, and the availability of remote Squids have been developed to guarantee the performance of the service and make the system easily maintainable. Following a brief introduction of the Frontier framework, we describe the performance of this highly reliable and stable system, detail monitoring concerns and their deployment, and discuss the overall operational experience from the first two years of LHC data-taking.

  14. Unguided bronchoscopic biopsy: Does yield increase with operator experience

    Directory of Open Access Journals (Sweden)

    Tyagi Rahul

    2017-08-01

    Full Text Available Background Bronchoscopic Forceps biopsy (Endobronchial Biopsy (EBB and Trans Bronchial Lung Biopsy (TBLB are commonly performed for diagnosis in patients with endobronchial abnormalities or diffuse parenchymal involvement. As the operator gains experience his yield of various diagnostic bronchoscopic biopsies is expected to increase, however, no studies on the subject are available in literature. Aims To determine the effect of on- job experience on the yield of unguided bronchoscopic biopsies. Methods A total of 244 bronchoscopies were performed between Oct 2013 and Oct 2016. A retrospective analysis of all these bronchoscopies was undertaken. All patients who underwent biopsy were included in the study. Patients were divided into two groups with first group (Group A comprising of biopsies done between Oct 2013 to Apr 2015 and second group comprising biopsies done between May 2015 to Oct 2016 (Group B. The diagnostic yield in two groups was compared. Results Total 71 bronchoscopic biopsies were performed during Oct 2013 to Oct 2016. 36 patients were included in group A and 35 patients were included in group B. The groups were matched in demographic profile, clinical diagnosis, bronchoscopic findings and type of biopsy undertaken. The biopsy was diagnostic in 31 patient (43.6 per cent and nondiagnostic in 33 patients (46.4 per cent. There were 15 diagnostic biopsies in group A and 16 diagnostic biopsies in group B. The difference in the diagnostic biopsies between the two groups was not significant. Conclusion There was no significant impact of on job experience on diagnostic yield of biopsies. This may be due to adequate exposure during training leading to a diagnostic plateau being reached.

  15. The safeguards on-site laboratory at Sellafield. Five years operational experience

    Energy Technology Data Exchange (ETDEWEB)

    Duinslaeger, L.; Belle, P. van; Mayer, K.; Casteleyn, K.; Abousahl, S.; Daures, P.; Eberle, H.; Enright, T.; Guiot, A.; Hild, M.; Horta Domenech, J.; Lajarge, P.; Laurent, P.; Le Terrier, A.; Lynch, B.; Marucci, M.; Millet, S.; Ottmar, H.; Richir, P.; Street, S.; Vallet, P.; Zuleger, E. [European Commission, Karlsruhe (Germany). Inst. for Transuranium Elements

    2004-06-01

    The start of operation of the large reprocessing facilities led Euratom Safeguards to a new approach for verification analysis of samples taken at the facility: the installation of on-site laboratories. The availability of analytical capabilities for independent verification measurements at the site of these facilities offers obvious advantages in view of timeliness of results. The 'On-Site Laboratory' (OSL) at the BNFL Sellafield site was the first ever and entered into operation in 1999. For almost five years, the Institute for Transuranium Elements (ITU) has been operating the laboratory under routine conditions. During this period, more than one thousand safeguards samples were analysed. The experience gained in the management, logistics and operation of the OSL allow a critical review based on a significant period in time. This includes also aspects of training of staff, maintenance of equipment, flow of information, and improvements in the efficiency. The analytical issues are of key importance: based on the operational experience, the measurement methods were adapted (changing boundary conditions), the distribution of samples according to material type changed (start up of MOS fabrication plant), and the cutback in resources triggered a further streamlining of the analytical efforts. (orig.)

  16. Interfacing system isolation experience review. Final report, August 1991

    International Nuclear Information System (INIS)

    1991-08-01

    A light water reactor power plant has auxiliary systems interconnected with the reactor coolant system that are not designed for reactor operating pressure. These principally include the shutdown heat removal systems and various emergency core cooling injection systems. There are multiple isolation valves that prevent rector vessel pressure from causing overpressurization in low pressure interfacing systems. Combinations of hardware failures or operational errors are necessary to expose these systems to overpressurization. This experience review provides insights regarding the risk that an auxiliary system might become over pressurized from the reactor system. While analyses show that for the pressures involved the probability of auxiliary system failure is low, the auxiliary system conceivably might fail outside of containment while the plant is at power. Such a potential event has come to be called an interfacing system loss of coolant accident (ISLOCA). This report provides a compilation of occurrences where valve leakage, valve failure, or valve mispositioning played a role in the ability to maintain interfacing system isolation. Seventeen U.S. BWR events, twenty three U.S. PWR events and one foreign event are discussed in the report. Eleven of the U.S. BWR events and ten U.S. PWR events are judged to relate directly to the so-called ISLOCA event in that they fulfilled one or more of the failures necessary to cause an ISLOCA. (author)

  17. Columbia River system operation review. Final environmental impact statement

    International Nuclear Information System (INIS)

    1995-11-01

    The Columbia River and its tributaries are the primary water system in the Pacific Northwest, draining some 219,000 square miles in seven states and another 39,500 square miles in British Columbia. Beginning in the 1930's, the Columbia River has been significantly modified by construction of 30 major dams on the river and its tributaries, along with dozens of non-Federal projects. Construction and subsequent operation of these water development projects have contributed to eight primary uses of the river system, including navigation, flood control, irrigation, electric power generation, fish migration, fish and wildlife habitat, recreation, and water supply and quality considerations. Increasing stress on the water development of the Columbia River and its tributaries has led primary Federal agencies to undertake intensive analysis and evaluation of the operation of these projects. These agencies are the U.S. Army Corps of Engineers and the Bureau of Reclamation, who operate the large Federal dams on the river, and the Bonneville Power Administration who sells the power generated at the dams. This review, termed the System Operation Review (SOR), has as its ultimate goal to define a strategy for future operation of the major Columbia River projects which effectively considers the needs of all river uses. This volume, Appendix D: Cultural resources appendix, Technical imput includes the following: Development of geomorphology based framework for cultural resources management, Dworshak Reservoir, Idaho; Impact profiles for SOR reservoirs; comments from the following Native American tribes: Burns Paiute Tribe; Coville Confederated Tribes; Confederated Tribes of the Warm Springs Indian Reservation; Confederated Tribes and bands of the Yakama Indian Nation (comments); Nez Perce Tribe; Coeur D'Alene Tribe; Spokane Tribe of Indians; The confederated Tribes of the Umatilla Indian Reservation

  18. Independent technical review of the Hanford Tank Farm Operations

    International Nuclear Information System (INIS)

    1992-07-01

    The Independent Technical Assessment of the Hanford Tank Farm Operations was commissioned by the Assistant Secretary for Environmental Restoration and Waste Management on November 1, 1991. The Independent Technical Assessment team conducted on-site interviews and inspections during the following periods: November 18 to 22,1991; April 13 to 17; and April 27 to May 1, 1992. Westinghouse Hanford Company is the management and operating contractor for the Department of Energy at the Hanford site. The Hanford Tank Farm Operations consists of 177 underground storage tanks containing 61 million gallons of high-level radioactive mixed wastes from the chemical reprocessing of nuclear fuel. The Tank Farm Operations also includes associated transfer lines, ancillary equipment, and instrumentation. The Independent Technical Assessment of the Hanford Tank Farm Operations builds upon the prior assessments of the Hanford Waste Vitrification System and the Hanford Site Tank Waste Disposal Strategy.The objective of this technical assessment was to determine whether an integrated and sound program exists to manage the tank-waste storage and tankfarm operations consistent with the Assistant Secretary for Environmental Restoration and Waste Management's guidance of overall risk minimization. The scope of this review includes the organization, management, operation, planning, facilities, and mitigation of the safety-concerns of the Hanford Tank Waste Remediation System. The assessments presented in the body of this report are based on the detailed observations discussed in the appendices. When the assessments use the term ''Hanford'' as an organizational body it means DOE-RL and Westinghouse Hanford Company as a minimum, and in many instances all of the stake holders for the Hanford site

  19. Review of trends in computerized systems for operator support

    International Nuclear Information System (INIS)

    Cain, D.G.

    1985-01-01

    The major trends shaping the development of computerized operator support systems in nuclear power plants are reviewed. These trends are the result of prior research in disturbance analysis systems that provided the technology base, and the SPDS requirement, which has been the impetus for change. The process is expected to result in hybrid control rooms with computer-driven supervisory workstations that complement conventional control board lay-outs. In the next three to five year period substantial upgrading of computer hardware will allow new and more sophisticated applications routines to be developed for operator support. Greater attention is being given to on-line validation of input signals for computer applications. A general movement towards operating strategies that are not based upon pre-analyzed event sequences is expected to influence the development of operator aids. The integration of displays with operating procedures will enable the computer system to a better coupling between problem detection and its resolution. Improved design methodology will assure that computer applications are accepted and used by operations personnel. Greater on-line analysis capability is stimulating the trend towards more on-site analysis and decision-making at nuclear power plants. Software standardization reflects the high cost of software development and the desire by utilities to gain greater independence from suppliers. There is growing realization that control rooms are beset by many of the demands and limitations of other office settings and that some of these may be addressed by the burgeoning office automation technology. Trends beyond the next five years are difficult to predict; however, there will be a trend towards more intelligent software. Artificial intelligence technology may play a pivotal role in future applications. Taking these trends into perspective, the author concludes that a promising future exists for computerized operator support in nuclear

  20. Low energy antiproton experiments - A review

    NARCIS (Netherlands)

    Jungmann, KP; Yamazaki, Y; Wada, M

    2005-01-01

    Low energy antiprotons offer excellent opportunities to study properties of fundamental forces and symmetries in nature. Experiments with them can contribute substantially to deepen our fundamental knowledge in atomic, nuclear and particle physics. Searches for new interactions can be carried out by

  1. Visual experience and blindsight: A methodological review

    DEFF Research Database (Denmark)

    Overgaard, Morten

    2011-01-01

    Blindsight is classically defined as residual visual capacity, e.g., to detect and identify visual stimuli, in the total absence of perceptual awareness following lesions to V1. However, whereas most experiments have investigated what blindsight patients can and cannot do, the literature contains...

  2. Review of JT-60 experiment (March 1986)

    International Nuclear Information System (INIS)

    1986-11-01

    Results of JT-60 experiment with ohmic heating in March 1986 are summarized. A maximum plasma current of 2 MA, an average plasma density of 5.7 x 10 19 m -3 and energy confinement time of 0.4 - 0.5 sec were obtained. Detailed characteristics of ohmic plasmas are discussed. (author)

  3. Development, operating experience and future plan of ABWR in Japan

    International Nuclear Information System (INIS)

    Ujihara, N.

    2001-01-01

    From 1974 to 1978 nuclear power plants' capacity factor decreased to a low level at the Tokyo Electric Power Company (TEPCO) for stress corrosion cracking of stainless steal pipe, thermal fatigue crack of feed water spurger and vibration trouble of LPRM, etc. So, for improving that situation, we gathered the most useful BWR technology in the world at that time and we started the ABWR project to develop an ideal BWR. The goals of this development were: (1) Enhanced safety and reliability; (2) Reduced occupational radiation exposure and radioactive waste; (3) Enhanced operability and maneuverability; and (4) Improved economy. Significant improvements were induced by the adoption of the reactor internal pump, fine motion control rod drive mechanism, integral type reinforced concrete containment vessel and digital control system. After about 10 years R and D, we succeeded in the development of the compact and economic plant, ABWR (1356MW(e)) whose building volume had been reduced to 76%, compared with the previous BWR (1100MW(e)). The construction of Kashiwazaki-Kariwa Nuclear Power Plant unit No. 6, which is the first ABWR plant in the world, was started September 1991, and that of unit No. 7 was started in February 1992. We used effective construction methods, such as large block construction method and all weather construction method, to shorten the construction duration from first concrete to commercial operation start to 51.5 months. The commercial operation start of Kashiwazaki-Kariwa Nuclear Power Plant unit No. 6 was November 1996 and that of unit No. 7 was July 1997. After that, unit No. 6 had three times the annual outage and unit No. 7 had two times the annual outage. Both plants have good operating experiences. From commercial operation start to end of August 2000, the capacity factor of unit No. 6 is 86.4% and that of unit No. 7 is 86.9%. Now, in Taiwan, ABWR plants are under construction at Lungmen unit No. 1 and 2. In Japan, ABWR plants are under

  4. Operating experience with decommissioning of underground components, USA

    International Nuclear Information System (INIS)

    2006-01-01

    In the USA there has over the years been widespread use of underground piping and tank storage systems, as well as use of other storage vaults and miscellaneous underground storage systems. In most instances these systems are associated with other operating facilities such as large nuclear facilities. There has been considerable experience over the last 60 years in the design, installation, operation and decommissioning of these radioactive waste handling and storage structures and systems. Legislation was enacted in the 1980s that required extensive upgrades to existing systems, with newly installed systems being required to meet stringent installation, operation and removal requirements. This has had an impact on the use of some of these underground systems. One major problem with many of these systems is to gauge the integrity of the systems after they have been in operation for many years and to accurately determine whether they have leaked or not. Depending on the results of these investigations, the next question is whether these systems even need to be excavated or if they can be dispositioned in place rather than expending a large amount of effort to excavate them and remove the materials in question to a disposal site for final dispositioning. In some areas this is possible while in others excavation is required. Over the years that nuclear facilities have been operational in the USA, advantage has been taken of the fact that the earth serves as a good location for emplacement of otherwise obtrusive (or even less aesthetically pleasing) structures. These structures are also still clearly able to support the useful mission they were always intended to fulfil. This arrangement also serves as a structural feature favourable to minimizing radiation exposure levels emanating from systems and components containing radioactive materials. In some cases, embedding of various components such as tanks, pits, vaults, pipes and ducting was an easy way to avoid these

  5. LHC 2011 operation - as viewed from the experiments

    International Nuclear Information System (INIS)

    Ferro-Luzzi, M.

    2012-01-01

    The 2011 LHC run is reviewed from the experiments' perspective. Cooperation between machine and experiments was again very constructive. The LHC produced pp physics collisions at √s = 7 TeV with a peak luminosity reaching about 3.6*10 33 cm -2 s -1 and delivering more integrated luminosity than expected (∼ 5.7 fb -1 in IP1 and IP5, 1.2 fb -1 in IP8). Thanks to this excellent LHC performance, ATLAS and CMS came close to discover or exclude the SM Higgs boson, while increasing further the pressure on supersymmetric models. LHCb was able to set unprecedented limits on the branching ratio of B s → μμ and to observe an intriguing CP violating asymmetry in charm decay. An intermediate energy pp run was successfully carried out to complement the heavy ion physics data. Furthermore, an impressive 16-fold increase in peak and integrated luminosity with Pb beams was realized (4.5*10 26 cm -2 s -1 and about 160 μb -1 per IP). ALICE, ATLAS and CMS produced a wealth of new heavy ion physics results that will sharpen the understanding of the quark-gluon plasma. A first TOTEM measurement of the total pp cross section was realized and more diffractive physics results obtained with Roman Pots (TOTEM and ALFA/ATLAS). Luminosity calibration measurements with van der Meer scans and beam-gas imaging were further improved, to the point that cross sections could be measured with about 2% accuracy

  6. Summary of operating experience in Swiss nuclear power plants 1993

    International Nuclear Information System (INIS)

    1994-07-01

    In 1993 the Swiss nuclear power plants produced their third highest combined annual output. The contribution to the total electricity generation in the country was close to 37%. Replacement of the steam generators in Beznau Unit 1 resulted in a longer than usual annual outage. For the other four units the availability figures were close to, or exceeded, those of previous years. The energy utilization was, however, lowered due to load reduction in autumn resulting from unusually high production by the hydro-electric power plants. The steam generator replacement at Beznau enabled an increase in electrical power of about 2% without increase in reactor power. With the approval of the Swiss government in December 1992, the output of the Muehleberg power plant was increased in two stages by a total of 10%. The application for an unlimited operating license for Beznau Unit 2, and for a power uprate at the Leibstadt power plant, are still pending. The average number of scrams at the Swiss plants remained stable, at less than one scram per reactor year. As a result of experience in the Swedish nuclear power plant at Barsebaeck, the suction strainers of the emergency core cooling systems of the boiling water reactors at Muehleberg and Leibstadt were replaced by strainers with larger surface areas. The re-inspection of crack indications previously detected in the core shroud of the Muehleberg reactor and the penetration tubes in the reactor pressure vessel closure head of Beznau revealed no growth during the intervening operating periods. Following the completion of installation activities during the annual outages at Beznau Unit 1, Goesgen and Leibstadt, all Swiss nuclear power plants are now equipped with filtered containment venting systems. (author) figs., tabs

  7. Operational and troubleshooting experiences in the SST-1 cryogenic system

    Science.gov (United States)

    Mahesuria, G.; Panchal, P.; Panchal, R.; Patel, R.; Sonara, D.; Gupta, N. C.; Srikanth, G. L. N.; Christian, D.; Garg, A.; Bairagi, N.; Patel, K.; Shah, P.; Nimavat, H.; Sharma, R.; Patel, J. C.; Tank, J.; Tanna, V. L.; Pradhan, S.

    2014-01-01

    Recently, the cooldown and current charging campaign have been carried out towards the demonstration of the first successful plasma discharge in the steady state superconducting Tokomak (SST-1). The SST-1 machine consists of cable-in-conduit wound superconducting toroidal as well as poloidal coils, cooled using 1.3 kW at 4.5 K helium refrigerator -cum- liquefier (HRL) system. The cryo system provides the two-phase helium at 0.13 MPa at 4.5 K as well as forced-flow pressurized helium at 0.4 MPa and in addition to 7 g-s-1 liquefaction capacity required for the current leads and other cold mass at 4.5 K. The entire integrated cold masses having different thermo hydraulic resistances cooled with the SST-1 HRL in optimised process parameters. In order to maintain different levels of temperatures and to facilitate smooth and reliable cooldown, warm-up, normal operations as well as to handle abnormal events such as, quench or utilities failures etc., exergy efficient process are adopted for the helium refrigerator-cum-liquefier (HRL) with an installed equivalent capacity of 1.3 kW at 4.5 K. Using the HRL, the cold mass of about 40 tons is being routinely cooled down from ambient temperature to 4.5 K with an average cooldown rate of 0.75 - 1 K-h-1. Long-term cryogenic stable conditions were obtained within 15 days in the superconducting coils and their connecting feeders. Afterwards, all of the cold mass is warmed-up in a controlled manner to ambient temperature. In this paper, we report the recent operational results of the cryogenic system during the first plasma discharge in SST-1 as well as the troubleshooting experiences of the cryogenic plant related hardware.

  8. Operating experience and procedures at the tritium systems test assembly

    International Nuclear Information System (INIS)

    Carlson, R.V.; Binning, K.E.; Cole, S.P.; Jenkins, E.M.; Wilhelm, R.C.; Cole, S.P.

    1988-01-01

    Operating procedures are important for the safe and efficient operation of the Tritium Systems Test Assembly (TSTA). TSTA has been operating for four years with tritium in a safe and efficient manner. The inventory of tritium in the process loop is 100 grams and several milestone runs have been completed. This paper describes the methods used to operate TSTA. 3 refs., 1 fig

  9. Operational Regimes of the National Spherical Torus Experiment; TOPICAL

    International Nuclear Information System (INIS)

    D. Mueller; M.G. Bell; R.E. Bell; M. Bitter; T. Bigelow; P. Bonoli; M. Carter; J. Ferron; E. Fredrickson; D. Gates; L. Grisham; J.C. Hosea; D. Johnson; R. Kaita; S.M. Kaye; H. Kugel; B.P. LeBlanc; R. Maingi; R. Majeski; R. Maqueda; J. Menard; M. Ono; F. Paoletti; S. Paul; C.K. Phillips; R. Pinsker; R. Raman; S.A. Sabbagh; C.H. Skinner; V.A. Soukhanovskii; D. Stutman; D. Swain; Y. Takase; J. Wilgen; J.R. Wilson; G.A. Wurden; S. Zweben

    2002-01-01

    The National Spherical Torus Experiment (NSTX) is a proof-of-principle experiment designed to study the physics of Spherical Tori (ST), i.e., low-aspect-ratio toroidal plasmas. Important issues for ST research are whether the high-eta stability and reduced transport theoretically predicted for this configuration can be realized experimentally. In NSTX, the commissioning of a digital real-time plasma control system, the provision of flexible heating systems, and the application of wall conditioning techniques were instrumental in achieving routine operation with good confinement. NSTX has produced plasmas with R/a(approx) 0.85 m/0.68 m, A(approx) 1.25, Ip* 1.1 MA, BT= 0.3-0.45 T, k* 2.2, d* 0.5, with auxiliary heating by up to 4 MW of High Harmonic Fast Waves, and 5 MW of 80 keV D0 Neutral Beam Injection (NBI). The energy confinement time in plasmas heated by NBI has exceeded 100 ms and a toroidal beta (bT= 2m0 and lt;p and gt;/BT02, where BT0 is the central vacuum toroidal magnetic field) up to 22% has be en achieved. HHFW power of 2.3 MW has increased the electron temperature from an initial 0.4 keV to 0.9 keV both with and without producing a significant density rise in the plasma. The early application of both NBI and HHFW heating has slowed the penetration of the inductively produced plasma current, modifying the current profile and, thereby, the observed MHD stability

  10. Operational Regimes of the National Spherical Torus Experiment

    International Nuclear Information System (INIS)

    Mueller, D.; Bell, M.G.; Bell, R.E.; Bitter, M.; Bigelow, T.; Bonoli, P.; Carter, M.; Ferron, J.; Fredrickson, E.; Gates, D.; Grisham, L.; Hosea, J.C.; Johnson, D.; Kaita, R.; Kaye, S.M.; Kugel, H.; LeBlanc, B.P.; Maingi, R.; Majeski, R.; Maqueda, R.; Menard, J.; Ono, M.; Paoletti, F.; Paul, S.; Phillips, C.K.; Pinsker, R.; Raman, R.; Sabbagh, S.A.; Skinner, C.H.; Soukhanovskii, V.A; Stutman, D.; Swain, D.; Takase, Y.; Wilgen, J.; Wilson, J.R.; Wurden, G.A.; Zweben, S.

    2002-01-01

    The National Spherical Torus Experiment (NSTX) is a proof-of-principle experiment designed to study the physics of Spherical Tori (ST), i.e., low-aspect-ratio toroidal plasmas. Important issues for ST research are whether the high-eta stability and reduced transport theoretically predicted for this configuration can be realized experimentally. In NSTX, the commissioning of a digital real-time plasma control system, the provision of flexible heating systems, and the application of wall conditioning techniques were instrumental in achieving routine operation with good confinement. NSTX has produced plasmas with R/a ∼ 0.85 m/0.68 m, A ∼ 1.25, Ip * 1.1 MA, BT = 0.3-0.45 T, k * 2.2, d * 0.5, with auxiliary heating by up to 4 MW of High Harmonic Fast Waves, and 5 MW of 80 keV D0 Neutral Beam Injection (NBI). The energy confinement time in plasmas heated by NBI has exceeded 100 ms and a toroidal beta (bT = 2m0 /BT02, where BT0 is the central vacuum toroidal magnetic field) up to 22% has be en achieved. HHFW power of 2.3 MW has increased the electron temperature from an initial 0.4 keV to 0.9 keV both with and without producing a significant density rise in the plasma. The early application of both NBI and HHFW heating has slowed the penetration of the inductively produced plasma current, modifying the current profile and, thereby, the observed MHD stability

  11. Operating experience of the automatic technological control system at the Kolsk NPP

    International Nuclear Information System (INIS)

    Volkov, A.P.; Ignatenko, E.I.; Kolomtsev, Yu.V.; Mel'nikov, E.F.; Trofimov, B.A.

    1981-01-01

    Briefly reviewed is operating experience of the automatic control systems of the kolsk NPP (KNPP) power units, where measuring technique of the neutron flux ''Iney'', ARM-4 power regulator, automatic turbine start-up system ATS are used. The main shortcomings of the technological process automatic control system (ACS) and ways of their removal are considered. It is noted that the KNPP ACS performs only limited start-up functions of the basic equipment and reactor power control as well as partially protection functions at instant loading drops and switch-off of the main circulating pump [ru

  12. A modern review of the operative management of chronic pancreatitis.

    Science.gov (United States)

    King, Jonathan C; Abeywardina, Shannon; Farrell, James J; Reber, Howard A; Hines, O Joe

    2010-10-01

    Chronic pancreatitis is a debilitating disease resulting in pain, intestinal malabsorption, endocrine dysfunction, and poor quality of life (QoL). Our aim was to analyze surgical outcomes for patients with chronic pancreatitis. Data for patients undergoing operations for chronic pancreatitis between 1990 and 2009 were reviewed. Demographics, operative and perioperative data, and survival were catalogued. QoL was determined (Short Form 36 and European Organisation for Research and Treatment of Cancer Quality of Life Questionnaire + PAN-26) and compared with historical controls. The mean age was 51 +/- 2 years, 38 patients were male (53%), the most common indication was pain (71%), the etiology of pancreatitis often was alcohol, and most patients underwent a Whipple procedure (56%). Operative time was 316 +/- 17 minutes and blood loss was 363 +/- 75 mL. There were 34 complications in 30 patients (42%) and one death. QoL surveys were administered for 25 of 55 (45%) surviving patients at a mean follow-up of 72 +/- 16 months. Mean survival was 99 +/- 9 months, whereas 5- and 10-year survival were 86 and 75 per cent. QoL scores were uniformly better than historical controls. Our data demonstrate that operations for chronic pancreatitis can be performed with acceptable morbidity and mortality. Patients have excellent survival and improved QoL compared with historical controls. Surgery is an effective and durable treatment option for patients with chronic pancreatitis.

  13. Irradiated Concrete in Nuclear Power Plants: Bridging the Gap in Operational Experience

    International Nuclear Information System (INIS)

    Hohmann, Brian P.; Esselman, Thomas C.; Wall, James J.

    2012-01-01

    The world's fleet of operating nuclear power plants (NPP) has been in-service for more than 20 years. In order to support the increasing demand for inexpensive power, many plants will be required to operate beyond 40 years, which was the original licensing period for existing NPPs. Improved knowledge of the performance of irradiated concrete is required to form a technical basis for long term operation (operation to 80+ years) of nuclear plants around the world. To date, operating experience (OE) of concrete subjected to irradiation has been acceptable, but there is an absence of data on this topic for extended periods of operation. The lack of empirical data has contributed to the difficulty of quantifying the long term behavior of concrete that is experiencing irradiation. Programs are in place that address other degradation mechanisms of concrete, but a clear and focused program is required on the effects of radiation. This paper presents a review of the available literature on the topic of the long-term irradiation effects on the mechanical properties of concrete, and provides a proposed methodology for the characterization of irradiated concrete removed from shut down or decommissioned commercial plants. (author)

  14. A review of PFR core distortion experience

    International Nuclear Information System (INIS)

    Brook, A.J.

    1984-01-01

    Neutron induced voidage (NIV) swelling and irradiation creep, acting together or individually, produce deformation in core components exposed to a fast neutron flux and can lead to mechanical interaction between them. Today the nature of these processes is reasonably well understood, and reactor designers have two options in attempting to accomodate them: either by employing a flexible free standing design in which contact loadings are low but in which distortion may be high, or more commonly, by some type of restrained core in which inter-component loadings are high, but where distortion is relatively small. The aims of this paper are: a. to describe briefly the various operational limits of core and core component distortion and how they arise, for which a brief description of reactor construction is necessary; b. to outline how the problems of inter-component contact loadings are overcome for the interactive core; c. to describe some other potential problems which arise either from absolute swelling, or from differential swelling between components; of particular relevance here is the problem of contact loadings between absorber rods and their guide tubes; d. to comment on the degree of agreement with, and the feedback provided by, PIE findings; e. to show how the results of the work influence reactor operators and the reload program

  15. Feedback of operation and maintenance experience into evolutionary plant design (HWRs)

    International Nuclear Information System (INIS)

    Hedges, K.R.; Sanatkumar, A.; Kwon, Oh-Cheol

    1999-01-01

    The process of feeding back operation and maintenance information into the CANDU plant design process has been in constant evolution since the beginning of the CANDU program. The commissioning and operation experience from the first commercial reactors at Pickering A and Bruce A was used extensively in the design of the first generation CANDU 6 Plants. These units have been in operation for 15 years, producing electricity at an average lifetime capacity factor of about 85%. In further advancing the CANDU 6 and 9 design, greater emphasis is placed on enhancements that can reduce operational costs and further improve plant performance by reducing the planned outage time. The plant design has been improved to facilitate maintenance scheduling, equipment isolation, maintenance and post maintenance testing. Individual tasks have been analyzed as well as the interaction between tasks during outages to reduce the down time required and simplify the execution of the work. This results in shorter outages, reduced radioactive dose and reduced costs. The Utilities have continued to play an important role in CANDU 6 Evolution. Specifically; the Korea Utility KEPCO has one of the original four CANDU 6 Plants and three of the most modem. Their feedback to the designers has been very helpful. One of the most important feedback processes is through the CANDU Owners Group, which provides information exchange between members. In India eight PHWRs of 220 MWe capacity are in operation. Four reactors, also of 220 MWe capacity are in advanced stages of construction. Site construction work of two units of 500 MWe PHWRs at Tarapur will be taken up shortly. Over the years, during construction and operation of these power stations, a large amount of experience has been accumulated. Operation and maintenance experience is shared with operating stations by intensive participation of design engineers in Station Operation Review meetings, trouble shooting and root cause analysis of problems

  16. Operative interventions for failed heller myotomy: a single institution experience.

    Science.gov (United States)

    Pallati, Pradeep K; Mittal, Sumeet K

    2011-03-01

    Recurrent dysphagia and/or gastroesophageal reflux (GER) are failures of treatment after Heller myotomy for achalasia. We present our single center experience with surgical interventions for these failures. We did a retrospective analysis of a prospectively collected database. Based on preoperative symptoms and endoscopy, esophagogram, and manometry results, patients were divided into three groups to guide management. Telephone follow-up was done using a structured foregut questionnaire. Between December 2003 and June 2009, 16 patients underwent operative interventions for disabling symptoms after previous Heller myotomy. Eight patients presented primarily with recurrent dysphagia and underwent transabdominal Heller myotomy with partial fundoplication. Seven patients reported good to excellent symptom relief at mean follow-up of 42 months. One patient reported no relief and eventually required esophageal bypass with retrosternal gastric pull-up. Four patients presented with uncontrolled GER. Two patients who underwent redo partial fundoplication reported poor symptomatic outcome and one patient has since undergone short limb Roux-en-y gastric bypass (SLRNYGB) with excellent symptom relief. The other two patients underwent SLRNYGB with excellent relief at 10 months. Four patients had end stage achalasia and underwent esophageal resection with reconstruction. All reported excellent symptom relief at mean follow-up of 36 months. Transabdominal redo Heller myotomy for dysphagia has good outcomes. Redo fundoplication for GER after previous myotomy has poor results and SLRNYGB is an effective option in these patients. Esophageal resection remains an effective, albeit morbid, option for end-stage achalasia.

  17. Operating experience with the Harwell thermo-mechanical generators

    International Nuclear Information System (INIS)

    Cooke-Yarborough, E.H.

    1980-06-01

    The Stirling-cycle thermo-mechanical generator (TMG) provides small amounts of electrical power continuously over long periods, while requiring much less fuel than other power sources running from hydrocarbon fuel or radio-isotopes. Two of these 25-watt generators, fuelled by propane, have been used to power the UK National Buoy on two successive missions. A total of more than three years experience at sea has now been accumulated. In addition, a 60-watt version has provided the power for a major lighthouse for more than a year. An early development version of the Thermo-mechanical Generator, adapted to run from the heat of a radio-isotope source, was loaded with strontium 90 titanate in October 1974 and has run continuously in the laboratory ever since. The improvements and changes found necessary in the course of 90,000 generator-hours of running time are described, and the improvements in operational performance and reliability which have resulted are outlined. (author)

  18. The safety experience of New Zealand adventure tourism operators.

    Science.gov (United States)

    Bentley, Tim A; Page, Stephen; Walker, Linda

    2004-01-01

    This survey examined parameters of the New Zealand adventure tourism industry client injury risk. The research also sought to establish priorities for intervention to reduce adventure tourism risk, and identify client injury control measures currently in place (or absent) in the New Zealand adventure tourism industry, with a view to establishing guidelines for the development of effective adventure tourism safety management systems. This 2003 survey builds upon an exploratory study of New Zealand adventure tourism safety conducted by us during 1999. A postal questionnaire was used to survey all identifiable New Zealand adventure tourism operators. The questionnaire asked respondents about their recorded client injury experience, perceptions of client injury risk factors, safety management practices, and barriers to safety. Some 27 adventure tourism activities were represented among the responding sample (n=96). The highest client injury risk was reported in the snow sports, bungee jumping and horse riding sectors, although serious underreporting of minor injuries was evident across the industry. Slips, trips and falls (STF) were the major client injury mechanisms, and a range of risk factors for client injuries were identified. Safety management measures were inconsistently applied across the industry. The industry should consider the implications of poor injury reporting standards and safety management practices generally. Specifically, the industry should consider risk management that focuses on minor (e.g., STF) as well as catastrophic events.

  19. Operational experience with the ALICE High Level Trigger

    Science.gov (United States)

    Szostak, Artur

    2012-12-01

    The ALICE HLT is a dedicated real-time system for online event reconstruction and triggering. Its main goal is to reduce the raw data volume read from the detectors by an order of magnitude, to fit within the available data acquisition bandwidth. This is accomplished by a combination of data compression and triggering. When HLT is enabled, data is recorded only for events selected by HLT. The combination of both approaches allows for flexible data reduction strategies. Event reconstruction places a high computational load on HLT. Thus, a large dedicated computing cluster is required, comprising 248 machines, all interconnected with InfiniBand. Running a large system like HLT in production mode proves to be a challenge. During the 2010 pp and Pb-Pb data-taking period, many problems were experienced that led to a sub-optimal operational efficiency. Lessons were learned and certain crucial changes were made to the architecture and software in preparation for the 2011 Pb-Pb run, in which HLT had a vital role performing data compression for ALICE's largest detector, the TPC. An overview of the status of the HLT and experience from the 2010/2011 production runs are presented. Emphasis is given to the overall performance, showing an improved efficiency and stability in 2011 compared to 2010, attributed to the significant improvements made to the system. Further opportunities for improvement are identified and discussed.

  20. Operational experience with the ALICE High Level Trigger

    International Nuclear Information System (INIS)

    Szostak, Artur

    2012-01-01

    The ALICE HLT is a dedicated real-time system for online event reconstruction and triggering. Its main goal is to reduce the raw data volume read from the detectors by an order of magnitude, to fit within the available data acquisition bandwidth. This is accomplished by a combination of data compression and triggering. When HLT is enabled, data is recorded only for events selected by HLT. The combination of both approaches allows for flexible data reduction strategies. Event reconstruction places a high computational load on HLT. Thus, a large dedicated computing cluster is required, comprising 248 machines, all interconnected with InfiniBand. Running a large system like HLT in production mode proves to be a challenge. During the 2010 pp and Pb-Pb data-taking period, many problems were experienced that led to a sub-optimal operational efficiency. Lessons were learned and certain crucial changes were made to the architecture and software in preparation for the 2011 Pb-Pb run, in which HLT had a vital role performing data compression for ALICE's largest detector, the TPC. An overview of the status of the HLT and experience from the 2010/2011 production runs are presented. Emphasis is given to the overall performance, showing an improved efficiency and stability in 2011 compared to 2010, attributed to the significant improvements made to the system. Further opportunities for improvement are identified and discussed.