Sample records for operating experience feedback

  1. Operating experience feedback in TVO

    Energy Technology Data Exchange (ETDEWEB)

    Piirto, A [Teollisuuden Voima Oy (Finland)

    1997-12-31

    TVO is a power company operating with two 710 MW BWR units at Olkiluoto. For operating experience feedback TVO has not established a separate organizational unit but rather relies on a group of persons representing various technical disciplines. The ``Operating Experience Group`` meets at about three-week intervals to handle the reports of events (in plant and external) which have been selected for handling by an engineer responsible for experience feedback. 7 charts.

  2. Feedback of operating experience in nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    The feedback of operating experience of nuclear facilities to the designers, manufacturers, operators and regulators is one important means of maintaining and improving safety. The Atomic Energy Control Board`s Advisory Committee on Nuclear Safety examined the means for feedback currently being employed, how effective they are and what improvements are advisable. The review found that the need for feedback of operating experience is well recognized within those institutions contributing to the safety of CANDU power reactors, and that the existing procedures are generally effective. Some recommendations, however, are submitted for improvement in the process.

  3. Feedback of operating experience in nuclear power plants

    International Nuclear Information System (INIS)

    1995-06-01

    The feedback of operating experience of nuclear facilities to the designers, manufacturers, operators and regulators is one important means of maintaining and improving safety. The Atomic Energy Control Board's Advisory Committee on Nuclear Safety examined the means for feedback currently being employed, how effective they are and what improvements are advisable. The review found that the need for feedback of operating experience is well recognized within those institutions contributing to the safety of CANDU power reactors, and that the existing procedures are generally effective. Some recommendations, however, are submitted for improvement in the process

  4. ETSON proposal on the European operational experience feedback system

    International Nuclear Information System (INIS)

    Maqua, Michael; Bertrand, Remy; Gelder, Pieter de

    2007-01-01

    The new IAEA Safety Fundamentals states regarding the operating experience feedback: The feedback of operating experience from facilities and activities - and, where relevant, from elsewhere - is a key means of enhancing safety. Processes must be put in place for the feedback and analysis of operating experience, including initiating events, accident precursors, near misses, accidents and unauthorized acts, so that lessons may be learned, shared and acted upon. This presentation deals with the proposal of the ETSON (European TSO Network) to optimize the European operating experiences feedback (OEF). It is generally recognized that the efficiency of nuclear safety supervision by public authorities is based on two key requirements: - the existence of a competent authority at national level, benefiting from an appropriate legislative and regulatory basis, from adequate (quantitatively and qualitatively) human resources, particularly for inspection purposes, - the availability of resources devoted to highly specialised independent technical expertise, in order to provide competent authorities with pertinent technical opinions on: -- the safety files provided by operators, for the purpose of licensing corresponding activities, -- the exploitation for regulatory purposes of the operating experience feed back from licensed nuclear installations. There are two worldwide systems intended to learn lessons from experience: the WANO (World Association of Nuclear Operators) system established by the licensees with access restricted to operating organizations and the IRS system jointly operated by IAEA and OECD/NEA accessible to regulators and to some other users nominated by the regulators in their countries. The IRS itself is dedicated to the analysis of safety significant operating events. NEA/CNRA runs a permanent working group on operating experience (WGOE). WGOE provides among other things also generic reports on safety concerns related to operating experiences and

  5. Operating experience feedback program at Olkiluoto NPP

    International Nuclear Information System (INIS)

    Kosonen, Mikko

    2002-01-01

    Recent review and development of the operating experience feedback program will be described. The development of the program has been based on several reviews by outside organizations. Main conclusions from these review reports and from the self assessment of safety performance, safety problems and safety culture on the basis of the operational events made by ASSET-method will be described. An approach to gather and analyze small events - so-called near misses - will be described. The operating experience program has been divided into internal and external operating experience. ASSET-methodology and a computer program assisting the analysis are used for the internal operating experience events. Noteworthy incidents occurred during outage are analyzed also by ASSET-method. Screening and pre analysis of the external operating experience relies on co-operation with ERFATOM, an organization of Nordic utilities for the exchange of nuclear industry experience. A short presentation on the performance of the Olkiluoto units will conclude the presentation. (author)

  6. Feedback of safety - related operational experience: Lessons learned

    Energy Technology Data Exchange (ETDEWEB)

    Elias, D [Commonwealth Edison Co. (United States)

    1997-09-01

    The presentation considers the following aspects of feedback of safety-related operational experience: lessons learned program, objectives, personnel characteristics; three types of documents for transmitting lessons learned issues.

  7. Feedback of safety - related operational experience: Lessons learned

    International Nuclear Information System (INIS)

    Elias, D.

    1997-01-01

    The presentation considers the following aspects of feedback of safety-related operational experience: lessons learned program, objectives, personnel characteristics; three types of documents for transmitting lessons learned issues

  8. Operational safety experience feedback by means of unusual event reports

    International Nuclear Information System (INIS)

    1996-07-01

    Operational experience of nuclear power plants can be used to great advantage to enhance safety performance provided adequate measures are in place to collect and analyse it and to ensure that the conclusions drawn are acted upon. Feedback of operating experience is thus an extremely important tool to ensure high standards of safety in operational nuclear power plants and to improve the capability to prevent serious accidents and to learn from minor deviations and equipment failures - which can serve as early warnings -to prevent even minor events from occurring. Mechanisms also need to be developed to ensure that operating experience is shared both nationally as well as internationally. The operating experience feedback process needs to be fully and effectively established within the nuclear power plant, the utility, the regulatory organization as well as in other institutions such as technical support organizations and designers. The main purpose of this publication is to reflect the international consensus as to the general principles and practices in the operational safety experience feedback process. The examples of national practices for the whole or for particular parts of the process are given in annexes. The publication complements the IAEA Safety Series No.93 ''Systems for Reporting Unusual Events in Nuclear Power Plants'' (1989) and may also give a general guidance for Member States in fulfilling their obligations stipulated in the Nuclear Safety Convention. Figs, tabs

  9. Operational safety experience feedback by means of unusual event reports

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-07-01

    Operational experience of nuclear power plants can be used to great advantage to enhance safety performance provided adequate measures are in place to collect and analyse it and to ensure that the conclusions drawn are acted upon. Feedback of operating experience is thus an extremely important tool to ensure high standards of safety in operational nuclear power plants and to improve the capability to prevent serious accidents and to learn from minor deviations and equipment failures - which can serve as early warnings -to prevent even minor events from occurring. Mechanisms also need to be developed to ensure that operating experience is shared both nationally as well as internationally. The operating experience feedback process needs to be fully and effectively established within the nuclear power plant, the utility, the regulatory organization as well as in other institutions such as technical support organizations and designers. The main purpose of this publication is to reflect the international consensus as to the general principles and practices in the operational safety experience feedback process. The examples of national practices for the whole or for particular parts of the process are given in annexes. The publication complements the IAEA Safety Series No.93 ``Systems for Reporting Unusual Events in Nuclear Power Plants`` (1989) and may also give a general guidance for Member States in fulfilling their obligations stipulated in the Nuclear Safety Convention. Figs, tabs.

  10. The Clearing House on Operating Experience Feedback (CH-OEF)

    International Nuclear Information System (INIS)

    Tanarro Colodron, J.

    2016-01-01

    Full text: The Clearing House on Operating Experience Feedback (CH-OEF) is an online information system that contains three technical databases available only to registered users: 1) Operating Experience Feedback (OEF) records, containing information about events occurred at Nuclear Power Plants; 2) Nuclear Power Plant (NPP) records, containing technical details about NPPs; 3) Documents about operating experience, such as the Topical Operating Experience Reports (TOERs) and the quarterly reports on nuclear power plant events. The main objective of the information system is to develop communication, cooperation and sharing of operating experience amongst the national nuclear regulatory authorities participating in EU Clearinghouse network. The CH-OEF is essential for the preparation and dissemination of the quarterly reports on NPP events. These reports are published every three months and are intended to be complementary to other international reporting systems, containing mainly recent information publicly available. Only events that are considered to be likely to have lessons applicable to EU NPPs or with a real or potential impact on nuclear safety are addressed in the reports. The CH-OEF is a fundamental tool for their preparation, providing specific features for a more efficient sharing of information as well as for facilitating the related discussion and decision making. (author

  11. European Clearinghouse for Nuclear Power Plants Operational Experience Feedback

    International Nuclear Information System (INIS)

    Martin Ramos, M.; Noel, M.

    2010-01-01

    In the European Union, in order to support the Community activities on operational experience, a centralized regional network on nuclear power plants operational experience feedback (European Clearinghouse on Operational Experience Feedback for Nuclear Power Plants) was established in 2008 at the EC JRC-IE, Petten (The Netherlands) on request of nuclear Safety Authorities of several Member States. Its main goal is to improve the communication and information sharing on OEF, to promote regional collaboration on analyses of operational experience and dissemination of the lessons learned. The enlarged EU Clearinghouse was launched in April 2010, and it is currently gathering the Regulatory Authorities of Finland, Hungary, Lithuania, the Netherlands, Romania, Slovenia, Switzerland, Bulgaria, Czec Republic, France, Germany, Slovak Republic, and Spain (these last six countries as observers). The OECD Nuclear Energy Agency, the IAEA, the EC Directorates General of the JRC and ENER are also part of the network. Recently, collaboration between some European Technical Support Organizations (such IRSN and GRS) and the EU Clearinghouse has been initiated. This paper explains in detail the objectives and organization of the EU Clearinghouse, as well as the most relevant activities carried out, like research work in trend analysis of events ocurred in NPP, topical reports on particular events, dissemination of the results, quarterly reports on events reported publicly and operational experience support to the members of the EU Clearinghouse. (Author)

  12. Reviewing operational experience feedback

    International Nuclear Information System (INIS)

    1991-04-01

    The purpose of this document is to provide detailed supplementary guidance to OSART experts to aid in the evaluation of operational experience feedback (OEF) programmes at nuclear power plants. The document begins by describing the objectives of an OEF programme. It goes on to indicate preparatory work and investigatory guidance for the expert. Section 5 describes attributes of an excellent OEF programme. Appended to these guidelines are examples of OEF documents from various plants. These are intended to help the expert by demonstrating the actual implementation of OEF in practice. These guidelines are in no way intended to conflict with existing national regulations and rules. A comprehensive OEF programme, as described in Section 2, would be impossible to evaluated in detail in the amount of time typically allocated for assessing OEF in an OSART review. The expert must use his or her time wisely by concentrating on those areas that appear to be the weakest

  13. European clearinghouse on nuclear power plants operational experience feedback

    International Nuclear Information System (INIS)

    Ranguelova, Vesselina; Bruynooghe, Christiane; Noel, Marc

    2010-01-01

    Learning from operational experience and applying this knowledge promptly and intelligently is one of the ways to improve the safety of Nuclear Power Plant (NPP). Recent reviews of the effectiveness of Operational Experience Feedback (OEF) systems have pointed to the need for further improvement, with importance being placed on tailoring the information to the needs of the regulators. In 2007, at the request of a number of nuclear safety regulatory authorities in Europe, the Institute for Energy of the European Commission's Joint Research Centre (EC JRC) initiated a project on Nuclear Power Plant operational experience feedback, which adopts an integrated approach to the research needed to strengthen the European capabilities for assessment of NPP operational events and to promote the development of tools and mechanisms for the improved application of the lessons learned. Consequently, a so-called ''European Clearinghouse'' on NPP OEF was established, which includes scientific officers from the EC JRC, a number of European nuclear safety regulatory authorities and some of their Technical Support Organizations (TSOs). The paper discusses the activities implemented in 2008 within the framework of the European Clearinghouse on NPP OEF (hereinafter called the European NPP Clearinghouse) and provides an overview of the main conclusions drawn from the safety studies performed. Outlook of the activities carried out in 2009 are given. (orig.)

  14. Feedback of operation and maintenance experience into evolutionary plant design (HWRs)

    International Nuclear Information System (INIS)

    Hedges, K.R.; Sanatkumar, A.; Kwon, Oh-Cheol

    1999-01-01

    The process of feeding back operation and maintenance information into the CANDU plant design process has been in constant evolution since the beginning of the CANDU program. The commissioning and operation experience from the first commercial reactors at Pickering A and Bruce A was used extensively in the design of the first generation CANDU 6 Plants. These units have been in operation for 15 years, producing electricity at an average lifetime capacity factor of about 85%. In further advancing the CANDU 6 and 9 design, greater emphasis is placed on enhancements that can reduce operational costs and further improve plant performance by reducing the planned outage time. The plant design has been improved to facilitate maintenance scheduling, equipment isolation, maintenance and post maintenance testing. Individual tasks have been analyzed as well as the interaction between tasks during outages to reduce the down time required and simplify the execution of the work. This results in shorter outages, reduced radioactive dose and reduced costs. The Utilities have continued to play an important role in CANDU 6 Evolution. Specifically; the Korea Utility KEPCO has one of the original four CANDU 6 Plants and three of the most modem. Their feedback to the designers has been very helpful. One of the most important feedback processes is through the CANDU Owners Group, which provides information exchange between members. In India eight PHWRs of 220 MWe capacity are in operation. Four reactors, also of 220 MWe capacity are in advanced stages of construction. Site construction work of two units of 500 MWe PHWRs at Tarapur will be taken up shortly. Over the years, during construction and operation of these power stations, a large amount of experience has been accumulated. Operation and maintenance experience is shared with operating stations by intensive participation of design engineers in Station Operation Review meetings, trouble shooting and root cause analysis of problems

  15. Velocity Feedback Experiments

    Directory of Open Access Journals (Sweden)

    Chiu Choi

    2017-02-01

    Full Text Available Transient response such as ringing in a control system can be reduced or removed by velocity feedback. It is a useful control technique that should be covered in the relevant engineering laboratory courses. We developed velocity feedback experiments using two different low cost technologies, viz., operational amplifiers and microcontrollers. These experiments can be easily integrated into laboratory courses on feedback control systems or microcontroller applications. The intent of developing these experiments was to illustrate the ringing problem and to offer effective, low cost solutions for removing such problem. In this paper the pedagogical approach for these velocity feedback experiments was described. The advantages and disadvantages of the two different implementation of velocity feedback were discussed also.

  16. Operating experience feedback from safety significant events at research reactors

    Energy Technology Data Exchange (ETDEWEB)

    Shokr, A.M. [Atomic Energy Authority, Abouzabal (Egypt). Egypt Second Research Reactor; Rao, D. [Bhabha Atomic Research Centre, Mumbai (India)

    2015-05-15

    Operating experience feedback is an effective mechanism to provide lessons learned from the events and the associated corrective actions to prevent recurrence of events, resulting in improving safety in the nuclear installations. This paper analyzes the events of safety significance that have been occurred at research reactors and discusses the root causes and lessons learned from these events. Insights from literature on events at research reactors and feedback from events at nuclear power plants that are relevant to research reactors are also presented along with discussions. The results of the analysis showed the importance of communication of safety information and exchange of operating experience are vital to prevent reoccurrences of events. The analysis showed also the need for continued attention to human factors and training of operating personnel, and the need for establishing systematic ageing management programmes of reactor facilities, and programmes for safety management of handling of nuclear fuel, core components, and experimental devices.

  17. Operating experience feedback from safety significant events at research reactors

    International Nuclear Information System (INIS)

    Shokr, A.M.

    2015-01-01

    Operating experience feedback is an effective mechanism to provide lessons learned from the events and the associated corrective actions to prevent recurrence of events, resulting in improving safety in the nuclear installations. This paper analyzes the events of safety significance that have been occurred at research reactors and discusses the root causes and lessons learned from these events. Insights from literature on events at research reactors and feedback from events at nuclear power plants that are relevant to research reactors are also presented along with discussions. The results of the analysis showed the importance of communication of safety information and exchange of operating experience are vital to prevent reoccurrences of events. The analysis showed also the need for continued attention to human factors and training of operating personnel, and the need for establishing systematic ageing management programmes of reactor facilities, and programmes for safety management of handling of nuclear fuel, core components, and experimental devices.

  18. Self-assessment on nuclear power plants operational experience feedback process

    International Nuclear Information System (INIS)

    Li Hongtao; Ding Ying

    2005-01-01

    This paper introduces the purpose and function of self-assessment conducted by the responsible organizations of nuclear power plants, and describes the methods and requirements of self-assessment on operational experience feedback process to give a example. (authors)

  19. Application of ASSET methodology and operational experience feedback of NPPs in China

    Energy Technology Data Exchange (ETDEWEB)

    Lan, Ziyong [The National Nuclear Safety Administration, Beijing (China)

    1997-10-01

    The introductive presentation of ASSET methodology to China started in March 1992, 3 experts from the IAEA held the ASSET Seminar in Wuhan, China. Three years later, an IAEA seminar on ASSET Method and Operational Experience Feedback proceeded in Beijing on 20-24 March 1995. Another ASSET seminar on Self-Assessment and Operational Experience Feedback was held at Guangdong NPP site on 2-6 December 1996, The NNSA and the GNPP hosted the seminar, 2 IAEA experts, 55 participants from the NPPs, research institutes, the regulatory body (NNSA) and its regional offices attended the seminar. 3 figs, 5 tabs.

  20. Application of ASSET methodology and operational experience feedback of NPPs in China

    International Nuclear Information System (INIS)

    Ziyong Lan

    1997-01-01

    The introductive presentation of ASSET methodology to China started in March 1992, 3 experts from the IAEA held the ASSET Seminar in Wuhan, China. Three years later, an IAEA seminar on ASSET Method and Operational Experience Feedback proceeded in Beijing on 20-24 March 1995. Another ASSET seminar on Self-Assessment and Operational Experience Feedback was held at Guangdong NPP site on 2-6 December 1996, The NNSA and the GNPP hosted the seminar, 2 IAEA experts, 55 participants from the NPPs, research institutes, the regulatory body (NNSA) and its regional offices attended the seminar. 3 figs, 5 tabs

  1. Lessons from feedback of safety operating experience for reactor physics

    International Nuclear Information System (INIS)

    Suchomel, J.; Rapavy, S.

    1999-01-01

    Analyses of events in WWER operations as a part of safety experience feedback provide a valuable source of lessons for reactor physics. Examples of events from Bohunice operation will be shown such as events with inadequate approach to criticality, positive reactivity insertions, expulsion of a control rod from shut-down reactor, problems with reactor protection system and control rods. (Authors)

  2. Operating experience feedback

    International Nuclear Information System (INIS)

    Cimesa, S.

    2007-01-01

    Slovenian Nuclear Safety Administration (SNSA) has developed its own system for tracking, screening and evaluating the operating experiences of the nuclear installations. The SNSA staff regularly tracks the operating experiences throughout the world and screens them on the bases of applicability for the Slovenian nuclear facilities. The operating experiences, which pass the screening, are thoroughly evaluated and also recent operational events in these facilities are taken into account. If needed, more information is gathered to evaluate the conditions of the Slovenian facilities and appropriate corrective actions are considered. The result might be the identification of the need for modification at the licensee, the need for modification of internal procedures in the SNSA or even the proposal for the modification of regulations. Information system helps everybody to track the process of evaluation and proper logging of activities. (author)

  3. The importance for nuclear safety of efficient feedback of operational experience

    International Nuclear Information System (INIS)

    1987-09-01

    Experience of practical operation is a valuable source of information for improving and optimizing the safety and reliability of nuclear power plants. Therefore it is essential to collect information on abnormal events occurring at plants during operation and on all deviations from normal performance by systems and personnel that could be precursors of accidents. For this purpose it is necessary to establish hierarchical systems to feedback operational safety experience at utility, national and international levels and to make these systems as effective as possible. The present report attempts to identify the safety objectives of these systems, to analyse the difficulties presently encountered and to suggest possible improvements

  4. Operational experience feedback with precursor analysis

    International Nuclear Information System (INIS)

    Koncar, M.; Ferjancic, M.; Muehleisen, A.; Vojnovic, D.

    2003-01-01

    Experience of practical operation is a valuable source of information for improving the safety and reliability of nuclear power plants. Operational experience feedback (Olef) system manages this aspect of NPP operation. The traditional ways of investigating operational events, such as the root cause analysis (RCA), are predominantly qualitative. RCA as a part of the Olef system provides technical guidance and management expectations in the conduct of assessing the root cause to prevent recurrence, covering the following areas: conditions preceding the event, sequence of events, equipment performance and system response, human performance considerations, equipment failures, precursors to the event, plant response and follow-up, radiological considerations, regulatory process considerations and safety significance. The root cause of event is recognized when there is no known answer on question 'why has it happened?' regarding relevant condition that may have affected the event. At that point the Olef is proceeding by actions taken in response to events, utilization, dissemination and exchange of operating experience information and at the end reviewing the effectiveness of the Olef. Analysis of the event and the selection of recommended corrective/preventive actions for implementation and prioritization can be enhanced by taking into account the information and insights derived from Pasa-based analysis. A Pasa based method, called probabilistic precursor event analysis (PPE A) provides a complement to the RCA approach by focusing on how an event might have developed adversely, and implies the mapping of an operational event on a probabilistic risk model of the plant in order to obtain a quantitative assessment of the safety significance of the event PSA based event analysis provides, due to its quantitative nature, appropriate prioritization of corrective actions. PPEA defines requirements for PSA model and code, identifies input requirements and elaborates following

  5. Operational experience feedback in the World Association of Nuclear Operators (WANO)

    International Nuclear Information System (INIS)

    Revuelta, Ramon

    2004-01-01

    Operators in high-risk industries need to be learning organisations, learning from themselves and from the others. This presentation will describe how the nuclear industry is dealing in an integrated manner with the feedback of operating experience (OE), both internal and external, to increase the safety and reliability of power plants; it will describe how it: - investigates events; - reports events and analyses trends; - shares information to prevent recurrence; - performs corrective action and training; - performs assessments to verify effectiveness. The plants have achieved great improvements in performance overall, and to improve further, the industry is evolving. Instead of just learning from past events (reactive) it is now focusing on lower level indications of problems (precursors) through low level events reporting, trending and analysis. A hallmark of the industry is its desire to be self-critical. Emphasis is placed on improving the bottom quartile performing plants

  6. Use of safety experience feedback to design new nuclear units

    International Nuclear Information System (INIS)

    Lange, D.; Crochon, J.P.

    1985-06-01

    For the designer, and about safety, the experience feedback can take place in 3 fields: the operating experience feedback (incidents analysis), the ''study'' experience feedback (improvement of justification and evolution of safety considerations), and the fabrication experience feedback. Some examples are presented for each field [fr

  7. Programmable DSP-based multi-bunch feedback--operational experience from six installations

    International Nuclear Information System (INIS)

    Fox, J.; Prabhakar, S.; Teytelman, D.; Young, A.; Stover, G.; Drago, A.; Serio, M.; Khan, S.; Knuth, T.; Kim, Y.; Park, M.

    2000-01-01

    A longitudinal instability control system, originally developed for the PEP-II, DAΦNE and ALS machines has in the last two years been commissioned for use at the PLS and BESSY-II light sources. All of the installations are running identical hardware and use a common software distribution package. This common structure is beneficial in sharing expertise among the labs, and allows rapid commissioning of each new installation based on well-understood diagnostic and operational techniques. While the installations share the common instability control system, there are significant differences in machine dynamics between the various colliders and light sources. These differences require careful specification of the feedback algorithm and system configuration at each installation to achieve good instability control and useful operational margins. This paper highlights some of the operational experience at each installation, using measurements from each facility to illustrate the challenges unique to each machine. Our experience on the opportunities and headaches of sharing development and operational expertise among labs on three continents is also offered

  8. Experience feedback of operation events in Ling'ao phase Ⅱ nuclear power plant

    International Nuclear Information System (INIS)

    Xiao Zhi; Tao Shusheng; Sun Guochen; Zhang Zengqing

    2012-01-01

    As a new operating nuclear power plant, Ling'ao Phase Ⅱ occurred 20 pieces of operational events in one year of first cycle. By analyzing the events in this paper, the causes of the events are mainly concentrated in three aspects: interface between commissioning and operating, DCS system and the management of human factors. Finally, author gives some suggestions on experience feedback, as a reference to other similar nuclear power plants. (authors)

  9. Operating experience feedback report: Progress in scram reduction: Commercial power reactors

    International Nuclear Information System (INIS)

    Bell, L.G.; O'Reilly, P.D.

    1989-03-01

    This report documents the results of a trends and patterns analysis of unplanned reactor scrams at commercial US nuclear power reactors from January 1, 1984 to January 1, 1988. Major objectives of this report prepared by the Nuclear Regulatory Commission's (NRC's) Office for Analysis and Evaluation of Operational Data (AEOD) are to: (1) provide feedback of operational experience regarding reactor scram trends in support of the Commission's Strategic Goals, (2) examine the causes of unplanned scrams, and (3) examine the relationship between the causes of unplanned scrams and industry initiatives undertaken to reduce the frequency of unplanned scrams, especially with a view to the potential for future scram rate reduction. 31 refs., 14 figs., 49 tabs

  10. Report of the peer review mission of national operational safety experience feedback process to the Ukraine 11-15 November 1996 Kiev

    International Nuclear Information System (INIS)

    1996-01-01

    At the invitation of the Nuclear Regulatory Administration of Ukraine (NRA), the IAEA carried out a Peer review mission of national operational safety experience feedback process at Kiev from 11 to 15 November 1996. The objective of this mission was to provide the host country, represented by the regulatory body, with independent and comprehensive review of current status of operational safety experience feedback (OSEF) process with respect to the IAEA's recommendations and international practices. The mission concluded that principal arrangements of operational feedback process in Ukraine are, at present, in force and brought positive results since their introduction. The mission also noted several good practices in these activities. 1 tab

  11. The continuation training of operators and feedback of operational experience in the Royal Navy's nuclear submarine programme

    International Nuclear Information System (INIS)

    Manson, R.P.

    1983-01-01

    Naval continuation training has relied heavily on the use of realistic simulators for over ten years, and this has been proved to be a cost-effective and efficient method of training. The type of simulator used, the selection and qualification of simulator instructors, and the method of training experienced operators is described. Also, the assessment of operator performance, the use of simulators during the final stages of operator qualification, and their use for training operators on plant operation whilst shut-down are covered. The Navy also pays great attention to the feedback of operating experience from sea into both continuation and basic training. This is accomplished using Incident Reports, which are rendered whenever the plant is operated outside the approved Operating Documentation, or when any other unusual circumstance arises. Each Report is individually assessed and replied to by a qualified operator, and those incidents of more general interest are published in a wider circulation document available to all plant operators. In addition, each crew is given an annual lecture on recent operating experiences. Important lessons are fed forward into new plant design, and the incident reports are also used as a source of information for plant reliability data. (author)

  12. Experience feedback of operational events of the control rod assembly and its drive mechanism in nuclear power plants

    International Nuclear Information System (INIS)

    Zhou Hong; Xiao Zhi; Tao Shusheng; Zheng Lixin; Chen Zhaolin

    2013-01-01

    Seventeen operational events of the control rod assembly and its drive mechanism are collected from 1992 to 2012 important nuclear operational events and feedback in referred nuclear power plants. After investigated and classified, several important issues, such as the impact of control rod swell and fuel assembly distortion, control rod drive mechanism leakage, and the control system reliability of control rod, are emphatically analyzed. Some suggestions of experience feedback are proposed. (authors)

  13. Learning from experience. Feedback to design

    International Nuclear Information System (INIS)

    Hopwood, J.M.; Shalaby, B.A.; Keil, H.

    1997-01-01

    AECL has been the designer of 25 commercial scale CANDU reactors now in operation, with more under construction. AECL has taken the evolutionary approach in developing its current designs, the CANDU 6 and CANDU 9 Nuclear Power Plants. An integral part of this approach is to emphasize feedback of experience to the designers, in a continuous improvement process. AECL has implemented a formal process of gathering and responding to feedback from: NPP operation, construction and commissioning; regulatory input; R and D results: as well as paying close attention to market input. A number of recent examples of design improvement via this feedback process are described

  14. Proposed Reactor Operating Experience Feedback System Development

    International Nuclear Information System (INIS)

    Ahn, Seung Hoon; Kim, Min Chul; Huh, Chang Wook; Lee, Durk Hun; Bae, Koo Hyun

    2006-01-01

    Most events occurring in nuclear power plants are not individually significant, and prevented from progressing to accident conditions by a series of barriers against core damage and radioactive releases. Significant events, if occur, are almost always a breach of these multiple barriers. As illustrated in the 'Swiss cheese' model, the individual layers of defense or 'cheese slices' have weakness or 'holes.' These weaknesses are inconstant, i.e., the holes are open or close at random. When by chance all the holes are aligned, a hazard causes the significant event of concern. Elements of low significant events, inattention to detail, time or economic pressure, uncorrected poor practices/habits, marginal maintenance and equipment care, etc., make holes in the layers of defense; some elements may make more holes in different layers, incurring more chances to be aligned. An effective reduction of the holes, therefore, is gained through better knowledge or awareness of increasing trends of the event elements, followed by appropriate actions. According to the Swiss cheese metaphor, attention to the Operating Experience (OE) feedback system, as opposed to the individual and to randomness, is drawn from a viewpoint of reactor safety

  15. PNRA Process for Utilizing Experience Feedback for Enhancing Nuclear Safety

    International Nuclear Information System (INIS)

    Shah, Z.H.

    2016-01-01

    One of the elements essential for any organization to become a learning organization is to learn from its own and others experience. The importance of utilizing experience feedback for enhancing operational safety is highlighted in nuclear industry again and again and this has resulted in establishment of several national and international forums. In addition, IAEA action plan on nuclear safety issued after Fukushima accident further highlighted the importance of experience sharing among nuclear community to enhance global nuclear safety regime. PNRA utilizes operating experience feedback gathered through different sources in order to improve its regulatory processes. During the review of licensing submissions, special emphasis is given to utilize the lessons learnt from experience feedback relating to nuclear industry within and outside the country. This emphasis has gradually resulted in various safety improvements in the facilities and processes. Accordingly, PNRA has developed a systematic process of evaluation of international operating experience feedback with the aim to create safety conscious approach. This process includes collecting information from different international forums such as IAEA, regulatory bodies of other countries and useful feedback of past accidents followed by its screening, evaluation and suggesting recommendations both for PNRA and its licensees. As a result of this process, several improvements concerning regulatory inspection plans of PNRA as well as in regulatory decision making and operational practices of licensees have been highlighted. This paper will present PNRA approach for utilizing experience feedback in its regulatory processes for enhancing / improving nuclear safety. (author)

  16. Life management and operational experience feedback - tools to enhance safety and reliability of the NPP

    International Nuclear Information System (INIS)

    Mach, P.

    1997-01-01

    Preparation has started of the Temelin power plant centralized equipment database. Principles of reliability centered maintenance are studied, and use of these activities will be made in the Plant Ageing Management Programme. The aims of the Programme are as follows: selection of important components subject to ageing, data collection, determination of dominant stressors, development, selection and validation of ageing evaluation methods, setup of experience feedback, determination of responsibilities, methodologies and strategy, elaboration of programme procedures and documentation, and maintenance of programme flexibility. Pilot studies of component ageing are under way: for the reactor pressure vessel, steam generator, pressurizer, piping, ECCS and cables. The organizational structure of the Operational Experience Feedback system is described, as are the responsibility of staff and sources of information. (M.D.)

  17. Contributions of the European Operating Experience Feedback Project to Support Regulatory Bodies

    International Nuclear Information System (INIS)

    Heitsch, M.

    2016-01-01

    Operating Experience Feedback (OEF) is one of the ways of improving the nuclear safety of operating nuclear power plants. The EC-Clearinghouse initiative was set up in 2008 to support nuclear regulatory authorities of EU Member States, but also Technical Support Organizations, international organizations and the broader nuclear community, to enhance nuclear safety. The differing regulatory regimes in the EU member countries and a significant diversity of the nuclear power plant (NPP) designs have been a challenge in the establishment of the European Clearinghouse. The European Clearinghouse is organized as a Network operated by a Central Office located at the Institute for Energy and Transport (IET) which is part of Joint Research Centre (JRC) of the European Commission. It gathers 17 European regulatory authorities and 3 major European Technical Support organizations (TSO). The Clearinghouse aims at providing lessons learned, recommendations and best practices from operational experience of NPPs based on support and commitment from the EU nuclear regulatory authorities. One of the objectives of the European Clearinghouse is to establish European best practices for the assessment of unusual events in NPPs. The paper will present the main activities of the European Clearinghouse. These include: • Topical studies providing in-depth assessment of selected topics important for the safe operation of NPPs. Statistical tools help to identify interesting subjects for these studies; • Quarterly reports on operating experience; • Training courses in the field of root cause analysis and event investigation; • Development, maintenance and population of a database for storage of operating experience related information; • Collaboration with international organizations such as IAEA and OECD/NEA on all aspects of OEF. All activities of the Clearinghouse initiative focus on providing an added value for nuclear regulation. (author)

  18. Reactor operation feed-back in France

    International Nuclear Information System (INIS)

    Feltin, C.; Fourest, B.; Libmann, J.

    1982-09-01

    The Nuclear Safety Department (DSN), technical support of French Safety Authorities, is, in particular, in charge of the analysis of reactor operation and of measures taken consequently to incidents. It proposed the criteria used to select significant incidents; it analyzes such incidents. DSN also analyzes the operating experience of each plant, several years after starting. It examines foreign incidents to assess in what extent lessons learned can be applied to french reactors. The examples presented show that to improve the safety of units operation, the experience feed-back leads to make arrangements, or modifications concerning not only circuits or materials but often procedures. Moreover they show the importance of procedures concerning the operations carried out during reactor shutdown

  19. Learning from experience: feedback to CANDU design

    International Nuclear Information System (INIS)

    Allen, P.J.; Hopwood, J.M.; Rousseau, G.P.

    1998-01-01

    AECL's main product line is based on two single unit CANDU nuclear power plant designs; CANDU 6 and CANDU 9, each of which is based on successfully operating CANDU plants. AECL's CANDU development program is based upon evolutionary improvement. The evolutionary design approach ensures the maximum degree of operational provenness. It also allows successful features of today's plants to be retained while incorporating improvements as they develop to the appropriate level of design maturity. A key component of this evolutionary development is a formal process of gathering and responding to feedback from: NPP operation, construction and commissioning; regulatory input; equipment supplier input; R and D results; market input. The progresses for gathering and implementing the experience feedback and a number of recent examples of design improvements from this feedback process are described in the paper. (author)

  20. PROSPER guidelines: Guidelines for peer review and for plant self-assessment of operational experience feedback process

    International Nuclear Information System (INIS)

    2003-01-01

    Effective use of operational performance information is an important element in any plant operator's arrangements for enhancing the operational safety of a nuclear power plant (NPP). This has been recognized in the IAEA Safety Fundamental, The Safety of Nuclear Installations (Safety Series No. 110). Under the technical aspects of safety, one of the principles of operation and maintenance is that the operating organization and the regulatory body shall establish complementary programmes to analyse operating experience to ensure that lessons are learned and acted upon. Such experience shall be shared with relevant national and international bodies. The Convention on Nuclear Safety, which entered into force in July 1996, also recognized the importance of operational experience feedback as a tool of high importance for the safety of nuclear plant operation and its further enhancement. It follows that the arrangements and results achieved under the operation experience feedback process in Member States will be covered by the national report under the Convention and will be subject to periodical review. These principles are further expanded in the IAEA Safety Standards Safety of Nuclear Power Plants: Operation (Safety Standard Series No. NS-R-2, year 2000) under the Feedback of The IAEA-led Peer Review of the effectiveness of the Operational Safety Performance Experience Review process (PROSPER) and associated guidelines have been developed to provide advice and assistance to utilities or individual power plants to strengthen and enhance the effectiveness of operational experience programmes in achieving these fundamental objectives. The objectives of the former IAEA Assessment of Significant Safety Events Team (ASSET) service have been expanded to include an evaluation of the effective use of all operating performance information available to the plant (e.g. external operating experience, internal low-level and near miss event reports and other relevant operating

  1. China: EDF's feedback experience of reactor operating is essential to win international markets

    International Nuclear Information System (INIS)

    Maillart, H.

    2016-01-01

    The main assets of EDF on the Chinese nuclear power market is first, its very important feedback experience of reactor operations (EDF cumulates one year of reactor operations every week due to its fleet of 58 reactors), secondly the cooperation with China allowed China to enter nuclear energy in 1983 with the construction of the Daya Bay plant and now to develop its own technology: the CPR-1000 reactor. China is the world leader in terms of nuclear market dynamism with 30 reactors in operation, 24 reactors being built and 40 others planned. A new stage in the Franco-China cooperation would be to share relevant good practices in the managing of both French and Chinese fleets of reactors. EDF has upgraded its commercial international offer, it now proposes to cover all the stages of the nuclear power plant from site selection to plant deconstruction via construction, operation, maintenance and waste management which constitutes a commitment over a 100 year period. (A.C.)

  2. Experience feedback of an operation event during the experiment of feed-water pump switch

    International Nuclear Information System (INIS)

    Sun Shuhai; Li Huasheng; Zhang Hao

    2012-01-01

    In this paper an event is summarized and analyzed, which caused the quit of the high-pressure heaters and the nuclear power rising, during the experiment of the driven feed-water pump switch. The good experience feedback on this event is brought out through gathering related information of domestic nuclear plants. (authors)

  3. Belgian class II nuclear facilities such as irradiators and accelerators. Regulatory Body attention points and operating experience feedback

    Energy Technology Data Exchange (ETDEWEB)

    Minne, Etienne; Peters, Christelle; Mommaert, Chantal; Kennes, Christian; Cortenbosch, Geert; Schmitz, Frederic; Haesendonck, Michel van [Bel V, Brussels (Belgium); Carlier, Pascal; Schrayen, Virginie; Wertelaers, An [Federal Agency for Nuclear Control, Brussels (Belgium)

    2016-11-15

    The aim of this paper is to present the Regulatory Body attention points and the operating experience feedback from Belgian ''class IIA'' facilities such as industrial and research irradiators, bulk radionuclides producers and conditioners. Reinforcement of the nuclear safety and radiation protection has been promoted by the Federal Agency for Nuclear Control (FANC) since 2009. This paper is clearly a continuation of the former paper [1] presenting the evolution in the regulatory framework relative to the creation of Bel V, the subsidiary of the FANC, and to the new ''class IIA'' covering heavy installations such as those mentioned above. Some lessons learnt are extracted from the operating experience feedback based on the events declared to the authorities. Even though a real willingness to meet the new safety requirements is observed among the ''class IIA'' licensees, promoting the safety culture, the nuclear safety and radiation protection remains an endless challenge for the Regulatory Body.

  4. Experience feedback of computerized controlled nuclear power plants

    International Nuclear Information System (INIS)

    Poizat, F.

    2004-01-01

    The N4 step of French PWR-type nuclear power plants is characterized by an instrumentation and control system entirely computerized (operation procedures including normal and accidental operation). Four power plants of this type (Chooz and Civaux sites) of 1450 MWe each were connected to the power grid between August 1996 and December 1999. The achievement of this program make it possible and necessary to carry out an experience feedback about the development, successes and difficulties encountered in order to draw out some lessons for future realizations. This is the aim of this article: 1 - usefulness and difficulties of such an experience feedback: evolution of instrumentation and control systems, necessary cautions; 2 - a successful computerized control: checking of systems operation, advantages, expectations; 3 - efficiency of computerized systems: demonstration of operation safety, profitability; 4 - conclusions and interrogations: system approach instead of 'micro-software' approach, commercial or 'made to measure' products, contract agreement with a supplier, when and how upgrading. (J.S.)

  5. Links between operating experience feedback of industrial accidents and nuclear safety

    International Nuclear Information System (INIS)

    Eury, S.P.

    2012-01-01

    Since 1992, the bureau for analysis of industrial risks and pollutions (BARPI) collects, analyzes and publishes information on industrial accidents. The ARIA database lists over 40.000 accidents or incidents, most of which occurred in French classified facilities (ICPE). Events occurring in nuclear facilities are rarely reported in ARIA because they are reported in other databases. This paper describes the process of selection, characterization and review of these accidents, as well as the following consultation with industry trade groups. It is essential to publicize widely the lessons learned from analyzing industrial accidents. To this end, a web site (www.aria.developpement-durable.gouv.fr) gives free access to the accidents summaries, detailed sheets, studies, etc. to professionals and the general public. In addition, the accidents descriptions and characteristics serve as inputs to new regulation projects or risk analyses. Finally, the question of the links between operating experience feedback of industrial accidents and nuclear safety is explored: if the rigorous and well-documented methods of experience feedback in the nuclear field certainly set an example for other activities, nuclear safety can also benefit from inputs coming from the vast diversity of accidents arisen into industrial facilities because of common grounds. Among these common grounds we can find: -) the fuel cycle facilities use many chemicals and chemical processes that are also used by chemical industries; -) the problems resulting from the ageing of equipment affect both heavy and nuclear industries; -) the risk of hydrogen explosion; -) the risk of ammonia, ammonia is a gas used by nuclear power plants as an ingredient in the onsite production of mono-chloramine and ammonia is involved in numerous accidents in the industry: at least 900 entries can be found in the ARIA database. The paper is followed by the slides of the presentation

  6. Feedback of experience and customer benefit

    International Nuclear Information System (INIS)

    Knecht, K.; Purucker, B.

    1993-01-01

    To ensure reliable and economic reactor operation, nuclear power plant operators expect fuel element service to contribute to avoiding product failures. This challenge within the overall fuel element system is met by making full use of the resources inherent in qualified and experienced personnel, comprehensive knowledge of the fuel element technologies of pressurized water and boiling water reactors, and the world-wide feedback of experience into the development of new fuel element designs and their components and the advanced development of existing ones. (orig.) [de

  7. Nuclear power plant operation experience - a feedback programme

    International Nuclear Information System (INIS)

    Banica, I.; Sociu, F.; Margaritescu, C.

    1994-01-01

    An effective high quality maintenance programme is required for the safe reliable operation of a nuclear power plant. To achieve the objectives of such a programme, both plant management and staff must be highly dedicated and motivated to perform high quality work at all levels. Operating and maintenance experience data collections and analysis are necessary in order to enhance the safety of the plant and reliability of the structures systems and components throughout their operating life. Significant events, but also minor incident, may reveal important deficiencies or negative trends adverse to safety. Therefore, a computer processing system for collecting, classifying and evaluating abnormal events or findings concerning operating-maintenance and for feeding back the results of the lessons learned from experience into the design and the operation of our nuclear power plant is considered to be of paramount importance. (Author)

  8. Requirements and Possibilities for Operational Experience Feedback from the Plant's Manufacturer's Point of View

    International Nuclear Information System (INIS)

    Schimann, P.

    2010-01-01

    corresponding projects. A special aspect concerning this matter is the resulting operational experience feedback related to events in nuclear power plants in operation inland and abroad. Hereby the issue of learning from mistakes made by others is addressed. Therefore improvements can already be implemented in the planning stage of new plants while also defects and failure events in operating plants can be avoided sustainable. Therefore smaller countries or countries that want to build their first nuclear power plant, participate more notably. AREVA carries the operational experience feedback out for both its own product portfolio, in the frame of know-how and know-why transfers and for stipulations with nuclear power plants organized in the VGB PowerTech (Technical Association of power and heat generators). The focus of the following discussion lies on the presentation of the volume and the returns of such a stipulation in daily business.(author).

  9. Improving the international system for operating experience feedback. INSAG-23. A report by the International Nuclear Safety Group

    International Nuclear Information System (INIS)

    2008-01-01

    The operational safety performance of nuclear facilities has, in general, improved notably over time throughout the world. This has been achieved, in part, through operating experience feedback (OEF) and the introduction of new technology. While the continued strong safety performance by operators is encouraging, safety significant events continue to recur in nuclear installations. This indicates that operators are not learning and applying the lessons that experience can teach us. This report focuses on systems that are operated by intergovernmental organizations with close contacts to national regulatory authorities. These systems provide an alternative network to the worldwide system employed by the operators of nuclear facilities known as the World Association of Nuclear Operators (WANO). The WANO system is restricted to its members, who have concluded that keeping the information exchanged confidential improves its usefulness. INSAG recognizes the merits of this approach, particularly in light of the primary responsibility of licensed operators for the safety of their facilities. Nevertheless, INSAG encourages WANO to share key safety lessons with national regulatory authorities and intergovernmental organization

  10. Feedback of operating experience into development of the advanced pressurized water reactor (APWR)

    International Nuclear Information System (INIS)

    Shimoda, S.; Venne, T. van de.

    1989-01-01

    The APWR development, which was successfully completed in 1987 with complete satisfaction of the design objectives, is one of the good examples of the successful international cooperative development. The successful completion of the development through management could be attributed to the following: Sophisticated implementation of development which consists of clear definition of performance goals, review and feedback of operating experience and consideration for reliable design through such development activities as detailed design evaluation, design reviews and verification by testings. Project organization and contractual arrangement which includes program director, project manager and engineering manager, and introduction of lead party/support party concept. Good oversea communication by means of high speed facsimile machine, electronic mail system and telephone conference, and frequent face-to-face meetings. Good communication with the utility companies at progress status and design decision meetings

  11. The role of the regulator in promoting and evaluating safety culture. Operating experience feedback programme approach

    International Nuclear Information System (INIS)

    Perez, S.

    2002-01-01

    Promoting and Evaluating Safety Culture (S.C.) in Operating Organizations must be one of the main Nuclear Regulator goals to achieve. This can be possible only if each and every one of the regulatory activities inherently involves S.C. It can be seen throughout attitudes, values, uses and practices in both individuals and the whole regulatory organization. One among all the regulatory tools commonly used by regulators to promote and evaluate the commitment of the licensees with safety culture as a whole involves organizational factors and particular attention is directed to the operating organization. This entailed a wide range of activities, including all those related with management of safety performance. Operating Experience Feedback Programme as a tool to enhance safety operation is particularly useful for regulators in the evaluation of the role of S.C. in operating organization. Safety Culture is recognized as a subset of the wider Organizational Culture. Practices that improve organizational effectiveness can also contribute to enhance safety. An effective event investigation methodology is a specific practice, which contributes to a healthy Safety Culture. (author)

  12. Magnet operating experience review for fusion applications

    International Nuclear Information System (INIS)

    Cadwallader, L.C.

    1991-11-01

    This report presents a review of magnet operating experiences for normal-conducting and superconducting magnets from fusion, particle accelerator, medical technology, and magnetohydrodynamics research areas. Safety relevant magnet operating experiences are presented to provide feedback on field performance of existing designs and to point out the operational safety concerns. Quantitative estimates of magnet component failure rates and accident event frequencies are also presented, based on field experience and on performance of similar components in other industries

  13. Experiments with positive, negative and topical relevance feedback

    NARCIS (Netherlands)

    Kaptein, R.; Kamps, J.; Li, R.; Hiemstra, D.

    2008-01-01

    This document contains a description of experiments for the 2008 Relevance Feedback track. We experiment with different amounts of feedback, including negative relevance feedback. Feedback is implemented using massive weighted query expansion. Parsimonious query expansion using Dirichlet smoothing

  14. Operating Experience at NPP Krsko

    International Nuclear Information System (INIS)

    Kavsek, D.; Bach, B.

    1998-01-01

    Systematic analysis of operational experience by assessment of internal and industry events and the feedback of lessons learned is one of the essential activities in the improvement of the operational safety and reliability of the nuclear power plant. At NPP Krsko we have developed a document called ''Operating Experience Assessment Program''. Its purpose is to establish administrative guidance for the processing of operating events including on-site and industry events. Assessment of internal events is based on the following methods: Event and Causal Factor Charting, Change Analysis, Barrier Analysis, MORT (Management Oversight and Risk Tree Analysis) and Human Performance Evaluation. The operating experience group has developed a sophisticated program entitled ''Operating experience tracking system'' (OETS) in response to the need for a more efficient way of processing internal and industry operating experience information. The Operating Experience Tracking System is used to initiate and track operational events including recommended actions follow up. Six screens of the system contain diverse essential information which allows tracking of operational events and enables different kinds of browsing. OETS is a part of the NPP Krsko nuclear network system and can be easily accessed by all plant personnel. (author)

  15. Operating nuclear plant feedback to ASME and French codes

    International Nuclear Information System (INIS)

    Journet, J.; O'Donnell, W.J.

    1996-01-01

    The French have an advantage in nuclear plant operating experience feedback due to the highly centralized nature of their nuclear industry. There is only one utility in charge of design as well as operations (EDF) and only one reactor vendor (Framatome). The ASME Code has played a key role in resolving technical issues in the design and operation of nuclear plants since the inception of nuclear power. The committee structure of the Code brings an ideal combination of senior technical people with both broad and specialized experience to bear on complex how safe is safe enough technical issues. The authors now see an even greater role for the ASME Code in a proposed new regulatory era for the US nuclear industry. The current legalistic confrontational regulatory era has been quite destructive. There now appears to be a real opportunity to begin a new era of technical consensus as the primary means for resolving safety issues. This change can quickly be brought about by having the industry take operating plant problems and regulatory technical issues directly to the ASME Code for timely resolution. Surprisingly, there is no institution in the US nuclear industry with such a mandate. In fact, the industry is organized to feedback through the Nuclear Regulatory Commission issues which could be far better resolved through the ASME Code. Major regulatory benefits can be achieved by closing this loop and providing systematic interaction with the ASME Code. The essential elements of a new regulatory era and ideas for organizing US institutional industry responsibilities, taken from the French experience, are described in this paper

  16. Feedback-Assisted Extension of the Tokamak Operating Space to Low Safety Factor

    Science.gov (United States)

    Hanson, J. M.

    2013-10-01

    Recent DIII-D experiments have demonstrated stable operation at very low edge safety factor, q95 instability. The performance of tokamak fusion devices may benefit from increased plasma current, and thus, decreased q. However, disruptive stability limits are commonly encountered in experiments at qedge ~ 2 (limited plasmas) and q95 ~ 2 (diverted plasmas), limiting exploration of low q regimes. In the recent DIII-D experiments, the impact and control of key disruptive instabilities was studied. Locked n = 1 modes with exponential growth times on the order of the wall eddy current decay timescale τw preceded disruptions at q95 = 2 . The instabilities have a poloidal structure that is consistent with VALEN simulations of the RWM mode structure at q95 = 2 . Applying proportional gain magnetic feedback control of the n = 1 mode resulted in stabilized operation with q95 reaching 1.9, and an extension of the discharge lifetime for > 100τw . Loss of feedback control was accompanied by power supply saturation, followed by a rapidly growing n = 1 mode and disruption. Comparisons of the feedback dynamics with VALEN simulations will be presented. The DIII-D results complement and will be discussed alongside recent RFX-MOD demonstrations of RWM control using magnetic feedback in limited tokamak discharges with qedge economical fusion power production. Supported by the US Department of Energy under DE-FG02-04ER54761 and DE-FC02-04ER54698.

  17. Recurring events, and the Possible Need to Reinforce Operating Experience Feedback Programs

    International Nuclear Information System (INIS)

    Ross, Denwood

    1999-09-01

    A nuclear power plant is designed for a spectrum of incidents and accidents, ranging from a reactor trip without other complications to more serious events such as pipe ruptures. Certain portions of the plant are designed for even more significant events such as severe accidents. Several thousand reactor years of experience have been recorded and many postulated events have in fact occurred. In some instances the same or similar event has occurred more than once within a single country or among several nations. Such cases are referred to as recurring events. One way to reduce the likelihood, or severity (or both) of recurrence is to maintain and utilize a system for reporting of events, both at the national and the international levels. The international system is referred as the Incident Reporting System. Events to be reported to IRS include: - The event itself is serious or important in terms of safety due to an actual or potential reduction in the plant's defense in depth; - The event reveals important lessons learned that will help the international community to prevent its recurrence as a safety significant event under aggravated conditions or to avoid the occurrence of a serious or important event in terms of safety; - The event is a repetition of a similar event previously reported to IRS, but highlights new important lessons learned for the international community. National systems for reporting of events vary in scope; there is guidance on systems for feedback of experience from events in nuclear power plants. Further, the Nuclear Safety Convention, Article 19 - Operation - provides (section vii) that each Contracting Party shall take the appropriate steps to ensure that 'programmes to collect and analyse operating experience are established, the results obtained and the conclusions drawn are acted upon and that existing mechanisms are used to share important experience with international bodies and with other operating organizations and regulatory bodies

  18. Summary of operating experience at Swedish nuclear power plants in 1984

    International Nuclear Information System (INIS)

    1985-01-01

    The four owners on nuclear power plants in Sweden - The Swedish State Power Board, Forsmarks Kraftgrupp AB, Sydkraft AB and OKG AKTIEBOLAG - formed in 1980 the Nuclear Safety Board of the Swedish Utilities as a joint body for collaboration in safety matters. The Board participates in coordination of the safety work of the utilities and conducts its own safety projects, whereever this is more efficient than the utilities' working independently. The work of the Board shall contribute to optimizing safety in the operation of the Swedish nuclear power plants. The most important function of the Board is to collect, process and evaluate information on operational disturbances and incidents at Swedish and foreign nuclear power plants and then use the knowledge thus gained to improve the safety of the operation of the Swedish nuclear power plants (experience feedback). The work with Experience Feedback proceeds in three stages: Event follow-up, Fault analysis and Feedback of results. The Board runs a system for experience feedback (ERF). ERF is a computer-based information and communication system. ERF provides the Board with a daily update of operating experience in both Swedish and foreign nuclear power plants. Each Swedish nuclear power station supplies the ERF system with data on, among other things, operation and operational distrubances. Important experiences are thereby fed back to plant operation. Experience from foreign nuclear power stations can be of interest to the Swedish nuclear power plants. This information comes to RKS and is reviewed daily. The information that is considered relevant to Swedish plants is fed after analysis into the ERF system. Conversely, foreign nuclear power stations can obtain information from the operation of the Swedish plants. (author)

  19. Feedback analysis of transimpedance operational amplifier circuits

    DEFF Research Database (Denmark)

    Bruun, Erik

    1993-01-01

    The transimpedance or current feedback operational amplifier (CFB op-amp) is reviewed and compared to a conventional voltage mode op-amp using an analysis emphasizing the basic feedback characteristics of the circuit. With this approach the paradox of the constant bandwidth obtained from CFB op...

  20. Nuclear Power Plant Operating Experience from the IAEA/NEA International Reporting System for Operating Experience 2012-2014

    International Nuclear Information System (INIS)

    2018-03-01

    The International Reporting System for Operating Experience (IRS) is an essential element of the international operating experience feedback system for nuclear power plants. Its fundamental objective is to contribute to improving safety of commercial nuclear power plants which are operated worldwide. IRS reports contain information on events of safety significance with important lessons learned which assist in reducing recurrence of events at other plants. This sixth publication, covering the period 2012 - 2014, follows the structure of the previous editions. It highlights important lessons based on a review of the approximately 240 event reports received from the participating countries over this period.

  1. Operation of PEP longitudinal feedback system

    International Nuclear Information System (INIS)

    Allen, M.A.; Karvonen, L.G.; McConnell, R.A.; Schwarz, H.

    1981-03-01

    In order to suppress longitudinal coupled-bunch oscillations which might limit the capabilities of PEP, the 18 GeV e + e - storage ring at SLAC, a longitudinal feedback system is utilized. A frequency domain feedback system was chosen with the frequency spectrum of the stored beam being sampled close to a symmetry point in the ring where the feedback cavity itself is also located. The symmetry point chosen is symmetry point 5 which lies half-way between interaction regions 4 and 6. The system has been installed in PEP and is now operational. However, at stored currents up to the maximum stored in PEP to date at 14.5 GeV (approximately 40 mA in 6 bunches), the ring has been stable to all modes of longitudinal coupled-bunch oscillations both barycentric and the other fundamental modes. By deliberately detuning the main accelerating cavities, small multibunch oscillations can be introduced which, in turn, can be damped by the feedback system. Under optimized beam conditions the feedback system could be adjusted to positive feedback and excite oscillations with relatively small power to the feedback cavity. This will be described along with other details of the system

  2. Operational status of the transverse multibunch feedback system at Diamond

    International Nuclear Information System (INIS)

    Uzun, I.; Abbott, M.; Heron, M.T.; Morgan, A.F.D.; Rehm, G.

    2012-01-01

    A transverse multibunch feedback (TMBF) system is in operation at Diamond Light Source to damp coupled-bunch instabilities up to 250 MHz in both the vertical and horizontal planes. It comprises an in-house designed and built analogue front end combined with a Libera Bunch-by-Bunch feedback processor and output stripline kickers. FPGA-based feedback electronics is used to implement several diagnostic features in addition to the basic feedback functionality. This paper reports on the current operational status of the TMBF system along with its characteristics. Also discussed are operational diagnostic functionalities including continuous measurement of the betatron tune and chromaticity. (authors)

  3. Experience feedback from nuclear cogeneration - 15369

    International Nuclear Information System (INIS)

    Auriault, C.; Fuetterer, M.A.; Baudrand, O.

    2015-01-01

    A consortium of 20 companies currently runs the NC2I-R (Nuclear Cogeneration Industrial Initiative - Research) project as part of the European Union's 7. Framework Programme. The project supports the development of an industrial initiative to demonstrate nuclear cogeneration of heat and power as an effective low-carbon technology for industrial market applications. As part of this project, operational feedback was collected from previous, existing and planned nuclear cogeneration projects in a number of countries with the aim of identifying a most complete set of boundary conditions which led to successful projects in the past. Stakeholders consulted include in particular utilities and end users. The scope encompassed technical and non-technical information (organizational structure, financial aspects, public relations, etc.) and specifically experience in licensing gained from these projects. The information was collected by a questionnaire and additional face-to-face interviews. The questionnaire was formulated to cover 9 categories of in total 56 questions for 36 identified projects: Motivation and initiative, Role of key players, Organizational structure, Technical aspects, Safety and licensing, Financial aspects, Timing, Public relations, General experience feedback. From the 36 identified projects worldwide, 23 from 10 countries have provided feedback on a variety of applications such as district heating, seawater desalination, paper and pulp industry, petrochemical industry, coal gasification or salt processing. This is a surprisingly positive response considering that several of these projects date back to the 1980's and many of them were performed outside Europe. This paper summarizes and analyzes the received information and deduces from there which boundary conditions are favorable for the construction of new nuclear cogeneration projects. (authors)

  4. Microcontroller-based Feedback Control Laboratory Experiments

    Directory of Open Access Journals (Sweden)

    Chiu Choi

    2014-06-01

    Full Text Available this paper is a result of the implementation of the recommendations on enhancing hands-on experience of control engineering education using single chip, small scale computers such as microcontrollers. A set of microcontroller-based feedback control experiments was developed for the Electrical Engineering curriculum at the University of North Florida. These experiments provided hands-on techniques that students can utilize in the development of complete solutions for a number of servo control problems. Significant effort was devoted to software development of feedback controllers and the associated signal conditioning circuits interfacing between the microcontroller and the physical plant. These experiments have stimulated the interest of our students in control engineering.

  5. Vibrotactile Feedback for Brain-Computer Interface Operation

    Directory of Open Access Journals (Sweden)

    Febo Cincotti

    2007-01-01

    Full Text Available To be correctly mastered, brain-computer interfaces (BCIs need an uninterrupted flow of feedback to the user. This feedback is usually delivered through the visual channel. Our aim was to explore the benefits of vibrotactile feedback during users' training and control of EEG-based BCI applications. A protocol for delivering vibrotactile feedback, including specific hardware and software arrangements, was specified. In three studies with 33 subjects (including 3 with spinal cord injury, we compared vibrotactile and visual feedback, addressing: (I the feasibility of subjects' training to master their EEG rhythms using tactile feedback; (II the compatibility of this form of feedback in presence of a visual distracter; (III the performance in presence of a complex visual task on the same (visual or different (tactile sensory channel. The stimulation protocol we developed supports a general usage of the tactors; preliminary experimentations. All studies indicated that the vibrotactile channel can function as a valuable feedback modality with reliability comparable to the classical visual feedback. Advantages of using a vibrotactile feedback emerged when the visual channel was highly loaded by a complex task. In all experiments, vibrotactile feedback felt, after some training, more natural for both controls and SCI users.

  6. Operation of the PEP transverse beam feedback

    International Nuclear Information System (INIS)

    Olson, C.W.; Paterson, J.M.; Pellegrin, J.L.; Rees, J.R.

    1981-02-01

    The PEP Storage Ring has been equipped with a wide band beam feedback system capable of damping the vertical and horizontal motion of six bunches. The oscillation detection is done at a symmetry point on the Storage Ring and feedback is applied at the same location one orbital period later. The signal is synchronously gated and the system appears as twelve independent feedback loops, operating on the two coordinates of each of the six bunches. Two beam deflection electrodes are driven each by a low-Q push-pull amplifier which is tuned at the 72nd harmonic of the revolution frequency and suppressed-carrier modulation is generated by a sequence of the detected bunch oscillations. The design parameters are reviewed as well as the salient features of the hardware, and the impact of this system on the machine operation is evaluated in the light of experimental results

  7. CANDU 9 Design improvements based on experience feedback

    International Nuclear Information System (INIS)

    Yu, S. K. W.; Bonechi, M.; Snell, V. G.

    2000-01-01

    An evolutionary approach utilizing advance technologies has been implenented for the enhancement introduced in the CANDU 9 Nuclear Power Plant (NPP) design. The design of these systems and associated equipment has also benfited from experience feedback from operating CANDU stations and from including advanced products from CANDU engineering and research programs. This paper highlights the design features that contribute to the safety improvements of the CANDU 9 design, summarizes the analysis results which demonstrate the improved performance and also emphasizes design features which reduce operation and maintenance (Q and M) costs. The safety design features highlighted include the increased use of passive devices and heat sinks to achieve extensive system simplification; this also improves reliability and reduces maintenance workloads. System features that contribute to improved operability are also described. The CANDU 9 Control Center provides plant staff with enhanced operating, maintenance and diagnostics features which significantly improve operability, testing and maintainability due to the integration of human factors engineering with a systematic design process. (author)

  8. Design of casks: incorporating operational feedback from maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Bimet, F.; Hartenstein, M. [COGEMA Logistics, Saint Quentin (France)

    2004-07-01

    Casks are designed to conform to regulations and to client specifications. Essential areas such as easy operation, low costs of maintenance, low operation and maintenance doses, limited waste, are not explicitly covered. Notwithstanding, COGEMA LOGISTICS uses all feedback available, so that casks are designed to be easy, safe and economical to operate and maintain. Maintenance is an activity where you do spot items that old-time designers could have made better, and things that users should not have done. Thanks to quality assurance, there are a number of data available, waiting to be collected and exploited; they have to be identified, located, retrieved, and analysed. Using information such as wear, damage, use of spare parts, access problems helps to make casks ever better. It leads to more efficient concepts, and to upgrades on existing designs; it also allows to integrate environmental considerations, inter alia in the choice of materials and in maintenance methods. It is necessary for the designer to interact with the users, the cask owners, the maintenance providers, in order to gather all relevant information and events. This is made easier when all these actors are ''under one roof'', or have very close ties. This paper presents COGEMA LOGISTICS methods for collecting and analysing all these experiences waiting to be used. It explains our process for analysing data, preparing yearly reports that are made available to our designers. It describes how each new design is subject to a maintainability study, using this feedback, so that the cask safety is always assured, that radiological doses are kept to a minimum, and that operating and maintenance costs will remain as low as possible.

  9. Design of casks: incorporating operational feedback from maintenance

    International Nuclear Information System (INIS)

    Bimet, F.; Hartenstein, M.

    2004-01-01

    Casks are designed to conform to regulations and to client specifications. Essential areas such as easy operation, low costs of maintenance, low operation and maintenance doses, limited waste, are not explicitly covered. Notwithstanding, COGEMA LOGISTICS uses all feedback available, so that casks are designed to be easy, safe and economical to operate and maintain. Maintenance is an activity where you do spot items that old-time designers could have made better, and things that users should not have done. Thanks to quality assurance, there are a number of data available, waiting to be collected and exploited; they have to be identified, located, retrieved, and analysed. Using information such as wear, damage, use of spare parts, access problems helps to make casks ever better. It leads to more efficient concepts, and to upgrades on existing designs; it also allows to integrate environmental considerations, inter alia in the choice of materials and in maintenance methods. It is necessary for the designer to interact with the users, the cask owners, the maintenance providers, in order to gather all relevant information and events. This is made easier when all these actors are ''under one roof'', or have very close ties. This paper presents COGEMA LOGISTICS methods for collecting and analysing all these experiences waiting to be used. It explains our process for analysing data, preparing yearly reports that are made available to our designers. It describes how each new design is subject to a maintainability study, using this feedback, so that the cask safety is always assured, that radiological doses are kept to a minimum, and that operating and maintenance costs will remain as low as possible

  10. Construction of experience feedback system for equipment supervision in nuclear engineering

    International Nuclear Information System (INIS)

    Zou Pingguo; Zhang Liying; Zhang Wenzhong

    2009-01-01

    Based on the analysis of the experience sources on equipment supervision in nuclear engineering, the details of the organization principle, working flow, and report requirement for the experience feedback system are introduced. The function range and its roll in the experience feedback system of the nuclear authority, nuclear power plant owners and equipment supervision organizations are illustrated. The standardization working requirements in the information gathering, analyzing, feedback and tracking process, and the characteristics and form of the incident report and feedback report are proposed. It emphasizes that the method for combined analysis of one significant incident and the whole incidents shall be adopted in the information analysis, and the experience feedback shall be considered in the development of equipment supervision technique and the equipment manufacturing, thus to maximize the use of experience feedback information to improve the pertinency and effectiveness of the experience feedback system. (authors)

  11. Operating experience feedback report - Solenoid-operated valve problems

    International Nuclear Information System (INIS)

    Ornstein, H.L.

    1991-02-01

    This report highlights significant operating events involving observed or potential common-mode failures of solenoid-operated valves (SOVs) in US plants. These events resulted in degradation or malfunction of multiple trains of safety systems as well as of multiple safety systems. On the basis of the evaluation of these events, the Office for Analysis and Evaluation of Operational Data (AEOD) of the US Nuclear Regulatory Commission (NRC) concludes that the problems with solenoid-operated valves are an important issue that needs additional NRC and industry attention. This report also provides AEOD's recommendations for actions to reduce the occurrence of SOV common-mode failures. 115 refs., 7 figs., 2 tabs

  12. Plant operator performance evaluation based on cognitive process analysis experiment

    International Nuclear Information System (INIS)

    Ujita, H.; Fukuda, M.

    1990-01-01

    This paper reports on an experiment to clarify plant operators' cognitive processes that has been performed, to improve the man-machine interface which supports their diagnoses and decisions. The cognitive processes under abnormal conditions were evaluated by protocol analyses interviews, etc. in the experiment using a plant training simulator. A cognitive process model is represented by a stochastic network, based on Rasmussen's decision making model. Each node of the network corresponds to an element of the cognitive process, such as observation, interpretation, execution, etc. Some observations were obtained as follows, by comparison of Monte Carlo simulation results with the experiment results: A process to reconfirm the plant parameters after execution of a task and feedback paths from this process to the observation and the task definition of next task were observed. The feedback probability average and standard deviation should be determined for each incident type to explain correctly the individual differences in the cognitive processes. The tendency for the operator's cognitive level to change from skill-based to knowledge-based via rule-based behavior was observed during the feedback process

  13. Plasma experiments on staged theta pinch, implosion heating experiment and Scyllac feedback-sector experiment

    International Nuclear Information System (INIS)

    Bartsch, R.R.; Buchenauer, C.J.; Cantrell, E.L.

    1977-01-01

    Results of the Los Alamos theta-pinch program in three areas of investigation are summarized: 1) In the Staged Theta Pinch, results are reported on the effects of magnetic field amplitude and time history of plasma formation. 2) In the Implosion Heating Experiment, density, internal-magnetic field and neutron measurements yield a consistent picture of the implosion which agrees with kinetic computations and with a simple dynamic model of the ions and magnetic piston. 3) In the Scyllac Feedback-Sector Experiment, the l=1, 0 equilibrium plasma parameters have been adjusted to accommodate the feedback stabilization system. With a uniform toroidal discharge tube the m=1 instability is feedback-stabilized in the vertical direction, and confinement in the toroidal direction is extended by feedback control. Results with a helical discharge tube are also reported. (author)

  14. Industry use of operating experience to achieve improved nuclear plant safety

    International Nuclear Information System (INIS)

    Zebroski, E.L.

    1981-01-01

    A principal lesson drawn from the accident at Three Mile Island was the need for a comprehensive and rigorous system for analysis and feedback of operating experience to reactor operators. Chief executives of US utilities directed in mid-1979 that an intensive and rigorous system of analysis and feedback of operating experience be established. This system is commonly referred to as the ''Significant Events Program''. Since April 1980, the Nuclear Safety Analysis Center (NSAC) has been joined by the Institute for Nuclear Power Operations (INPO) in the field investigation of significant operating events. NSAC has responsibility for analysis of the design and physical events aspects, while INPO has primary responsibility for the operators' aspects, including procedures and training. The process of screening, analysis and feedback of operating experience is now functioning as a seven-step process. A variety of data sources is used, including License Event Reports and outage and major maintenance reports. These are compiled and indexed in convenient form. However, such data bases are used only as incidental tools for the basic investigations and analytical efforts. Rapid dissemination of results is provided by a computer-aided conferencing system, which links 70 operating LWR reactors in the USA, and which has now been extended to four utilities outside the USA, representing several dozen more reactors. Major safety and economic incentives are evident for the rigorous use of such operating experience and for participation in a comprehensive system. Traditional habits of secrecy are recognized as obstacles to timely communication. A principal responsibility of top management of reactor-operating organizations is to overcome such habits where they are counter to the public interest, as well as to the health and survival interest of the utility itself

  15. SPIN. First Digital Protection System Feedback of experience ... ... after 30 years

    International Nuclear Information System (INIS)

    Kosicki, M.; Pacuta, J.; Kamga, J.; Burel, J.-P.

    2010-01-01

    In this lecture Mr Burel presents experience with the software SPIN - the first digital protection system feedback. After thirty years of operation, the results are positive: - System is in correct operation and still maintained with spare parts available; - No spurious trip or actuation due to the system itself. A project for modernization is prepared to replace the digital part with a new digital technology designed with today's: - Components (SPINLINE 3); - methods and tools (Software development); - Standards (EMI/RFI - qualification), in order to allow customer to add some new functional needs and to keep the system in operation for thirty more years.

  16. Decommissioning project feedback experience in the Japan Atomic Energy Research Institut

    International Nuclear Information System (INIS)

    Yanagihara, S.; Tachibana, M.; Miyajima, K.

    2003-01-01

    Since starting the research and development program for peaceful use of nuclear energy in 1950's, various research and demonstration facilities have been constructed in research organizations, universities and commercial sectors in Japan. Some of the nuclear facilities constructed in the early stage of research and development have been retired to be decommissioned because of completion of the initial objectives in the Japan Atomic Energy Research Institute (JAERI). On the other hand, since the first commercial operation of nuclear power plant (1968), the number of nuclear power plants has increased up to 52 plants operating as of August 2003 in Japan. The shear of nuclear energy accounts approximately for 35% of electricity generation in total at present time. However, several nuclear power plants have been operated for more than 25 years and two nuclear power plants are expected to be finally shutdown by 2010 to be eventually decommissioned. The Tokai Power Station, the oldest Japanese nuclear power plant operated by the Japan Atomic Power Company, was permanently shutdown from March 1998 and it is in decommissioning stage at this time. The Fugen, which is advanced thermal reactor operated by the Japan Nuclear Cycle Development Institute (JNC), was finally shutdown on March, 2003 after 25 years operation to be decommissioned. In addition, relating to planned unification between JAERI and JNC in 2005, the studies have been in progress on decommissioning and radioactive waste treatment and disposal; the cost was estimated to be 10 to 30 billion Japanese yens per year during 80 years for decommissioning of nearly 200 nuclear facilities. Decommissioning of nuclear facilities is thus getting to be one of important issues in Japan. Decommissioning of nuclear facilities might be possible using conventional and/or partially improved technology. However, reviewing project feedback experience on decommissioning and decontamination might contribute to solve various issues

  17. Operating Experience from Events Reported to the IAEA Incident Reporting System for Research Reactors

    International Nuclear Information System (INIS)

    2015-03-01

    Operating experience feedback is an effective mechanism in providing lessons learned from events and the associated corrective actions to prevent them, helping to improve safety at nuclear installations. The Incident Reporting System for Research Reactors (IRSRR), which is operated by the IAEA, is an important tool for international exchange of operating experience feedback for research reactors. The IRSRR reports contain information on events of safety significance with their root causes and lessons learned which help in reducing the occurrence of similar events at research reactors. To improve the effectiveness of the system, it is essential that national organizations demonstrate an appropriate interest for the timely reporting of events important to safety and share the information in the IRSRR database. At their biennial technical meetings, the IRSRR national coordinators recommended collecting the operating experience from the events reported to the IRSRR and disseminating it in an IAEA publication. This publication highlights the root causes, safety significance, lessons learned, corrective actions and the causal factors for the events reported to the IRSRR up to September 2014. The publication also contains relevant summary information on research reactor events from sources other than the IRSRR, operating experience feedback from the International Reporting System for Operating Experience considered relevant to research reactors, and a description of the elements of an operating experience programme as established by the IAEA safety standards. This publication will be of use to research reactor operating organizations, regulators and designers, and any other organizations or individuals involved in the safety of research reactors

  18. A System for the Feedback of Experience from Events in Nuclear Installations. Safety Guide (Spanish Edition); Un sistema de retroinformacion sobre la experiencia derivada de sucesos ocurridos en establecimientos nucleares. Guia de seguridad

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2012-07-15

    This Safety Guide provides recommendations on all the main components of operating experience feedback systems, utilizing relevant information on events and abnormal conditions that have occurred at nuclear installations around the world. It focuses on the interaction between the different systems for using operating experience feedback and constitutes an update and an extension of Part I, A National System, of Systems for Reporting Unusual Events in Nuclear Power Plants (IAEA Safety Series No. 93). Contents: 1. Introduction; 2. Main elements of a national system for the feedback of operational experience; 3. Screening of events; 4. Investigation and analysis of events; 5. Corrective actions; 6. Trending and review to recognize emergent problems; 7. Utilization, dissemination and exchange of information on operating experience; 8. Reviewing the effectiveness of the process for feedback of operational experience; 9. Quality assurance; 10. Reporting of safety related events; Appendix I: Reporting criteria and categories; Appendix II: Types of event report, timing, format and content; Appendix III: Investigation and analysis of events; Appendix IV: Approval and implementation of corrective actions; Annex I: Data management for the feedback of operating experience; Annex II: Example of elements of a national feedback system for operating experience.

  19. A virtual reality-based method of decreasing transmission time of visual feedback for a tele-operative robotic catheter operating system.

    Science.gov (United States)

    Guo, Jin; Guo, Shuxiang; Tamiya, Takashi; Hirata, Hideyuki; Ishihara, Hidenori

    2016-03-01

    An Internet-based tele-operative robotic catheter operating system was designed for vascular interventional surgery, to afford unskilled surgeons the opportunity to learn basic catheter/guidewire skills, while allowing experienced physicians to perform surgeries cooperatively. Remote surgical procedures, limited by variable transmission times for visual feedback, have been associated with deterioration in operability and vascular wall damage during surgery. At the patient's location, the catheter shape/position was detected in real time and converted into three-dimensional coordinates in a world coordinate system. At the operation location, the catheter shape was reconstructed in a virtual-reality environment, based on the coordinates received. The data volume reduction significantly reduced visual feedback transmission times. Remote transmission experiments, conducted over inter-country distances, demonstrated the improved performance of the proposed prototype. The maximum error for the catheter shape reconstruction was 0.93 mm and the transmission time was reduced considerably. The results were positive and demonstrate the feasibility of remote surgery using conventional network infrastructures. Copyright © 2015 John Wiley & Sons, Ltd.

  20. Feedback-assisted extension of the tokamak operating space to low safety factor

    International Nuclear Information System (INIS)

    Hanson, J. M.; Bialek, J. M.; Navratil, G. A.; Olofsson, K. E. J.; Shiraki, D.; Turco, F.; Baruzzo, M.; Bolzonella, T.; Marrelli, L.; Martin, P.; Piovesan, P.; Piron, C.; Piron, L.; Terranova, D.; Zanca, P.; Hyatt, A. W.; Jackson, G. L.; La Haye, R. J.; Lanctot, M. J.; Strait, E. J.

    2014-01-01

    Recent DIII-D and RFX-mod experiments have demonstrated stable tokamak operation at very low values of the edge safety factor q(a) near and below 2. The onset of n = 1 resistive wall mode (RWM) kink instabilities leads to a disruptive stability limit, encountered at q(a) = 2 (limiter plasmas) and q 95  = 2 (divertor plasmas). However, passively stable operation can be attained for q(a) and q 95 values as low as 2.2. RWM damping in the q(a) = 2 regime was measured using active MHD spectroscopy. Although consistent with theoretical predictions, the amplitude of the damped response does not increase significantly as the q(a) = 2 limit is approached, in contrast with damping measurements made approaching the pressure-driven RWM limit. Applying proportional gain magnetic feedback control of the n = 1 modes has resulted in stabilized operation with q 95 values reaching as low as 1.9 in DIII-D and q(a) reaching 1.55 in RFX-mod. In addition to being consistent with the q(a) = 2 external kink mode stability limit, the unstable modes have growth rates on the order of the characteristic wall eddy-current decay timescale in both devices, and a dominant m = 2 poloidal structure that is consistent with ideal MHD predictions. The experiments contribute to validating MHD stability theory and demonstrate that a key tokamak stability limit can be overcome with feedback

  1. Nuclear training and experience feedback in Sweden

    International Nuclear Information System (INIS)

    Olofsson, B.G.

    1987-01-01

    There are several different ways of educating and training the personnel at the Swedish nuclear power plants: centralized training in full-scale and part-task simulators; centralized education in the form of technical academic courses where computerized teaching is also used; extensive decentralized training out at the nuclear power plants, where compact simulators are also used; and experience feedback forms an important part of the training. Five performance indicators will be identified and the results will be presented. The excellent results are a good indication of the fact that well-executed education and training and smoothly functioning experience feedback give results

  2. Operational experience, availability and reliability of nuclear power plants

    International Nuclear Information System (INIS)

    Kueffer, K.

    1980-01-01

    This lecture - presents a survey on nuclear power production and plant performance in the Western World covering all reactor types and light-water reactors in particular and discusses key parameters such as load factors and non-availability analysis. - outlines the main reasons for the reliable performance of Swiss nuclear power plants - quality equipment - operator qualification and training - engineering know how on site - maintenance philosophy and outage planning - information system and feedback of experience - explains the management functions as applied at the Beznau Nuclear Power Station to ensure high power productivity and reliability - improvement - a feedback control system - analysis of production losses - optimization in shut-down planning - minimizing disturbances during plant operation - optimizing personnel qualification and efficiency. (orig.)

  3. Using GoPro to Give Video-Assisted Operative Feedback for Surgery Residents: A Feasibility and Utility Assessment.

    Science.gov (United States)

    Moore, Maureen D; Abelson, Jonathan S; O'Mahoney, Paul; Bagautdinov, Iskander; Yeo, Heather; Watkins, Anthony C

    this tool to include additional procedures. Although there has been progress toward improving operative feedback, room for further improvement remains. The use of a head-mounted GoPro is a dynamic tool that provides high-quality video for operative review and has the potential to augment the training experience of GS residents. Future studies exploring a wide array of open procedures involving a greater number of trainees will be needed to further define the use of this resource. Copyright © 2017. Published by Elsevier Inc.

  4. Operating experience feedback report: Experience with pump seals installed in reactor coolant pumps manufactured by Byron Jackson

    International Nuclear Information System (INIS)

    Bell, L.G.; O'Reilly, P.D.

    1992-09-01

    This report examines the reactor coolant pump (RCP) seal operating experience through August 1990 at plants with Byron Jackson (B-J) RCPs. ne operating experience examined in this analysis included a review of the practice of continuing operation with a degraded seal. Plants with B-J RCPs that have had relatively good experience with their RCP seals attribute this success to a combination of different factors, including: enhanced seal QA efforts, modified/new seal designs, improved maintenance procedures and training, attention to detail, improved seal operating procedures, knowledgeable personnel involved in seal maintenance and operation, reduction in frequency of transients that stress the seals, seal handling and installation equipment designed to the appropriate precision, and maintenance of a clean seal cooling water system. As more plants have implemented corrective measures such as these, the number of B-J RCP seal failures experienced has tended to decrease. This study included a review of the practice of continued operation with a degraded seal in the case of PWR plants with Byron Jackson reactor coolant pumps. Specific factors were identified which should be addressed in order to safety manage operation of a reactor coolant pump with indications of a degrading seal

  5. Experience feedback examination in PWR type reactors operating for the 1997-1999 period; Examen du retour d'experience en exploitation des reacteurs a eau sous pression pour la periode 1997-1999

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-07-01

    The present report is relative to the examination that the permanent group has made on the experience feedback in operation for PWR type reactors for the period 1997-1999 that was on eleven themes chosen by the Nuclear Safety and Radiation Protection Authority. It used analysis reports made by I.R.S.N. in support of four meetings of the permanent group devoted to this examination from April 2001 to June 2002. The different themes were operating uncertainties, machining to vibrations, analysis of incidents and gaseous releases, circuits, human factors, behaviour of electric batteries, risk of cold source loss. (N.C.)

  6. Trust and automation: the influence of automation malfunctions and system feedback on operator trust

    International Nuclear Information System (INIS)

    Strand, Stine

    2001-10-01

    Level of operator trust in an automatic system, which is not in accordance with the reliability of the system, might impose serious threats concerning issues of safety, productivity and the well being of the operator. Operator trust is therefore regarded as an important variable in man-machine interaction. The focus of this study was the influence of automatic malfunctions and amount of feedback provided by the automatic system on level of operator trust. The study was conducted in conjunction with the Human Centred Automation 2000-experiment. Two questionnaires attempting to measure operator trust were developed, designed to reflect the dimensions of predictability, dependability and faith. Analysis of the questionnaires demonstrated that they were reliable tools for measurement of operator trust. Factor analysis did not completely confirm the theoretical dimensions of trust, but indicated partial support. Operator trust correlated negatively with workload across situations, and positively with performance in complex situations. The results of the hypotheses tests demonstrated that operator trust gradually decreased after introduction of malfunctions. The effect of different malfunctions was however the opposite of what was expected, with obvious malfunctions reducing trust more than more camouflaged and safety critical malfunctions. Trust in the automatic system in general was lower than trust in specific malfunctioning components. Different interfaces providing different amount of feedback to the operator did not significantly influence level of operator trust. (Author)

  7. Stabilizing operation point technique based on the tunable distributed feedback laser for interferometric sensors

    Science.gov (United States)

    Mao, Xuefeng; Zhou, Xinlei; Yu, Qingxu

    2016-02-01

    We describe a stabilizing operation point technique based on the tunable Distributed Feedback (DFB) laser for quadrature demodulation of interferometric sensors. By introducing automatic lock quadrature point and wavelength periodically tuning compensation into an interferometric system, the operation point of interferometric system is stabilized when the system suffers various environmental perturbations. To demonstrate the feasibility of this stabilizing operation point technique, experiments have been performed using a tunable-DFB-laser as light source to interrogate an extrinsic Fabry-Perot interferometric vibration sensor and a diaphragm-based acoustic sensor. Experimental results show that good tracing of Q-point was effectively realized.

  8. A Feedback Model for Data-Rich Learning Experiences

    Science.gov (United States)

    Pardo, Abelardo

    2018-01-01

    Feedback has been identified as one of the factors with the largest potential for a positive impact in a learning experience. There is a significant body of knowledge studying feedback and providing guidelines for its implementation in learning environments. In parallel, the areas of learning analytics or educational data mining have emerged to…

  9. Feedback-assisted extension of the tokamak operating space to low safety factor

    Energy Technology Data Exchange (ETDEWEB)

    Hanson, J. M., E-mail: jmh2130@columbia.edu; Bialek, J. M.; Navratil, G. A.; Olofsson, K. E. J.; Shiraki, D.; Turco, F. [Department of Applied Mathematics and Applied Physics, Columbia University, New York, New York 10027-6900 (United States); Baruzzo, M.; Bolzonella, T.; Marrelli, L.; Martin, P.; Piovesan, P.; Piron, C.; Piron, L.; Terranova, D.; Zanca, P. [Consorzio RFX, Corso Stati Uniti 4, 35127 Padova (Italy); Hyatt, A. W.; Jackson, G. L.; La Haye, R. J.; Lanctot, M. J.; Strait, E. J. [General Atomics, P.O. Box 85608, San Diego, California 92186-5608 (United States); and others

    2014-07-15

    Recent DIII-D and RFX-mod experiments have demonstrated stable tokamak operation at very low values of the edge safety factor q(a) near and below 2. The onset of n = 1 resistive wall mode (RWM) kink instabilities leads to a disruptive stability limit, encountered at q(a) = 2 (limiter plasmas) and q{sub 95} = 2 (divertor plasmas). However, passively stable operation can be attained for q(a) and q{sub 95} values as low as 2.2. RWM damping in the q(a) = 2 regime was measured using active MHD spectroscopy. Although consistent with theoretical predictions, the amplitude of the damped response does not increase significantly as the q(a) = 2 limit is approached, in contrast with damping measurements made approaching the pressure-driven RWM limit. Applying proportional gain magnetic feedback control of the n = 1 modes has resulted in stabilized operation with q{sub 95} values reaching as low as 1.9 in DIII-D and q(a) reaching 1.55 in RFX-mod. In addition to being consistent with the q(a) = 2 external kink mode stability limit, the unstable modes have growth rates on the order of the characteristic wall eddy-current decay timescale in both devices, and a dominant m = 2 poloidal structure that is consistent with ideal MHD predictions. The experiments contribute to validating MHD stability theory and demonstrate that a key tokamak stability limit can be overcome with feedback.

  10. Presurized water reactor safety approach and analysis. From conception to experience feedback

    International Nuclear Information System (INIS)

    Libmann, J.

    1987-04-01

    This report deals in ten chapters, with the following subjects: 1. Safety approach methods; 2. Study of accidents; 3. Safety analysis; 4. Study of internal aggressions or those involved by the site; 5. Consideration of complementary situations; 6. Three Mile Island accident; 7. Safety during operation and experience feedback; 8. An example of analysis: steam generator closure plug; 9. Probabilistic safety evaluation; 10. Chernobyl accident. 30 refs [fr

  11. Data analysis method for plant experience feedback data bank

    International Nuclear Information System (INIS)

    Ployart, R.; Lannoy, A.

    1988-01-01

    French pressurized water reactors (PWRs) represent at the moment about fifty units, among which the oldest have been in operation for ten years. Furthermore, these PWRs developed according to a growth strategy of standardized plants and with a single plant operator are quite homogeneous in their design as well as in their operating and maintenance procedures. Lastly, the improvements brought about are usually passed on to the whole of the concerned standardized plant. In this context, the operating plant experience feedback data banks hold valuable information that starts being statistically significant. The reliability oriented methods are rather well known; the ones that enable to read out some information on performance and availability, susceptible to guide the plant operator in the decision making are less tested. It concerns changes of operating or maintenance procedure, or technical changes which could be decided from an assessment of the effects of previous changes, or by observing and explaining a posteriori natural evolutions in the behaviour of components. The method used within the framework of this report leads to reveal and explain singularities, correlations, regroupings and trends in the behaviour of the french PWRs

  12. Small scale thermal-hydraulic experiment for stable operation of a pius-type reactor

    International Nuclear Information System (INIS)

    Tasaka, K.; Tamaki, M.; Imai, S.; Irianto, I.D.; Tsuji, Y.; Kukita, Y.

    1994-01-01

    Thermal-hydraulic experiments using a small-scale atmospheric pressure test loop have been performed for the Process Inherent Ultimate Safety (PIUS)-type reactor to develop the new pump speed feedback control system. Three feedback control systems based on the measurement of flow rate, differential pressure, and fluid temperature distribution in the lower density lock have been proposed and confirmed by a series of experiments. Each of the feedback control systems had been verified in the simulation experiment such as a start-up simulation test. The automatic pump speed control based on the fluid temperature at the lower density lock was quite effective to maintain the stratified interface between primary water and borated pool water for stable operation of the reactor. (author)

  13. International experience feedback on fatigue monitoring systems for nuclear power plants

    International Nuclear Information System (INIS)

    Morilhat, P.

    1997-01-01

    From the very beginning of electro-nuclear programmes the need has become internationally obvious to develop systems aiming at automation and improvement of monitoring of the transients stressing the main mechanical components of nuclear units, by checking the conservativeness of the design no longer from a comparison of causes (temperature and pressure variations) but by directly assessing the results (stresses and linked damage). Prototypes of such systems have appeared since the middle of the 1980's mainly in France, the USA and Germany, and manufacturing them has since continued. Several years of development and on site testing of prototypes of fatigue measuring devices designed by the R and D Direction have enabled contacts with the developers of similar systems to be established and, in some cases, comparisons to be made. The experience accumulated in the use of such systems, both in France and abroad from now on makes a first experience feedback possible. The fatigue measuring device concept is based on a succession of elementary modules which enable the information received from the unit to be processed, first in the form of transient counting (transient meters), then in the form of mechanical diagnosis (fatigue monitoring systems). Among the systems in operation some provide actually only the transient meter part while others link transient meters and fatigue meters (EDF, EPRI and MITSUBISHI systems and some versions of the SIEMENS system). Moreover, numerous systems require, in addition to unit operation instrumentation, specific instrumentation located in monitored areas. The number of devices in operation has not stopped growing since the middle of the 80's to reach 53 systems working in 1996. The biggest developers are EPRI and its consultant Structural Integrity Associates (FatiguePro system), SIEMENS (FAMOS system) and EDF whose gradual implementation of SYSFAC from '96 is going to make its share particularly increase. Technical experience feedback

  14. Learning lessons from accidents with a human and organisational factors perspective: deficiencies and failures of operating experience feedback systems

    International Nuclear Information System (INIS)

    Dechy, N.; Rousseau, J.M.; Jeffroy, F.

    2012-01-01

    This paper aims at reminding the failures of operating experience feedback (OEF) systems through the lessons of accidents and provides a framework for improving the efficiency of OEF processes. The risk is for example to miss lessons from other companies and industrial sectors, or to miss the implementation of adequate corrective actions with the risk to repeat accidents. Most of major accidents have been caused by a learning failure or other organisational factors as a contributing cause among several root causes. Some of the recurring organisational factors are: -) poor recognition of critical components, of critical activities or deficiency in anticipation and detection of errors, -) excessive production pressure, -) deficiency of communication or lack of quality of dialogue, -) Excessive formalism, -) organisational complexity, -) learning deficiencies (OEF, closing feedback loops, lack of listening of whistle-blowers). Some major accidents occurred in the nuclear industry. Although the Three Mile Island accident has multiple causes, in particular, an inappropriate design of the man-machine interface, it is a striking example of the loss of external lessons from incidents. As for Fukushima it is too early to have established evidence on learning failures. The systematic study and organisational analysis of OEF failures in industrial accidents whatever their sector has enabled us to provide a framework for OEF improvements. Five key OEF issues to improve in priority: 1) human and organisational factors analysis of the root causes of the events, 2) listening to the field staff, dissenting voices and whistle-blowers, 3) monitoring of the external events that provide generic lessons, 4) building an alive memory through a culture of accidents with people who become experiences pillars, and 5) the setting of external audit or organisational analysis of the OEF system by independent experts. The paper is followed by the slides of the presentation

  15. Feedback stabilization initiative

    International Nuclear Information System (INIS)

    1997-06-01

    Much progress has been made in attaining high confinement regimes in magnetic confinement devices. These operating modes tend to be transient, however, due to the onset of MHD instabilities, and their stabilization is critical for improved performance at steady state. This report describes the Feedback Stabilization Initiative (FSI), a broad-based, multi-institutional effort to develop and implement methods for raising the achievable plasma betas through active MHD feedback stabilization. A key element in this proposed effort is the Feedback Stabilization Experiment (FSX), a medium-sized, national facility that would be specifically dedicated to demonstrating beta improvement in reactor relevant plasmas by using a variety of MHD feedback stabilization schemes

  16. Feedback stabilization initiative

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-06-01

    Much progress has been made in attaining high confinement regimes in magnetic confinement devices. These operating modes tend to be transient, however, due to the onset of MHD instabilities, and their stabilization is critical for improved performance at steady state. This report describes the Feedback Stabilization Initiative (FSI), a broad-based, multi-institutional effort to develop and implement methods for raising the achievable plasma betas through active MHD feedback stabilization. A key element in this proposed effort is the Feedback Stabilization Experiment (FSX), a medium-sized, national facility that would be specifically dedicated to demonstrating beta improvement in reactor relevant plasmas by using a variety of MHD feedback stabilization schemes.

  17. Practice of knowledge management for institutes--take the construction of experience feedback system as the example

    International Nuclear Information System (INIS)

    Wu Kaiping

    2014-01-01

    The construction of experience feedback system is an important part and breakthrough point of institutes' knowledge management. It is significant for institutes' design, management, development and innovation. This article introduces the concept of experience feedback for institutes. It also goes details of the content of experience feedback system construction for institutes, including the founding of experience feedback organizational mechanism, the development of experience feedback system, construction of knowledge database system, the construction of knowledge resources, and the appraisal of experience feedback's performance. Furthermore, the recognition and support of leaders, understanding and cooperation of relative departments, and corporation's culture of encouraging knowledge sharing, also are the important guarantees for the good effects of institutes' experience feedback work. (author)

  18. Design of the control room of the N4-type PWR: main features and feedback operating experience

    International Nuclear Information System (INIS)

    Peyrouton, J.M.; Guillas, J.; Nougaret, Ch.

    2004-01-01

    This article presents the design, specificities and innovating features of the control room of the N4-type PWR. A brief description of control rooms of previous 900 MW and 1300 MW -type PWR allows us to assess the change. The design of the first control room dates back to 1972, at that time 2 considerations were taken into account: first the design has to be similar to that of control rooms for thermal plants because plant operators were satisfied with it and secondly the normal operating situation has to be privileged to the prejudice of accidental situations just as it was in a thermal plant. The turning point was the TMI accident that showed the weight of human factor in accidental situations in terms of pilot team, training, procedures and the ergonomics of the work station. The impact of TMI can be seen in the design of 1300 MW-type PWR. In the beginning of the eighties EDF decided to launch a study for a complete overhaul of the control room concept, the aim was to continue reducing the human factor risk and to provide a better quality of piloting the plant in any situation. The result is the control room of the N4-type PWR. Today the cumulated feedback experience of N4 control rooms represents more than 20 years over a wide range of situations from normal to incidental, a survey shows that the N4 design has fulfilled its aims. (A.C.)

  19. Management of a radiological emergency. Experience feedback and post-accident management

    International Nuclear Information System (INIS)

    Dubiau, Ph.

    2007-01-01

    In France, the organization of crisis situations and the management of radiological emergency situations are regularly tested through simulation exercises for a continuous improvement. Past severe accidents represent experience feedback resources of prime importance which have led to deep changes in crisis organizations. However, the management of the post-accident phase is still the object of considerations and reflections between the public authorities and the intervening parties. This document presents, first, the nuclear crisis exercises organized in France, then, the experience feedback of past accidents and exercises, and finally, the main aspects to consider for the post-accident management of such events: 1 - Crisis exercises: objectives, types (local, national and international exercises), principles and progress, limits; 2 - Experience feedback: real crises (major accidents, other recent accidental situations or incidents), crisis exercises (experience feedback organization, improvements); 3 - post-accident management: environmental contamination and people exposure, management of contaminated territories, management of populations (additional protection, living conditions, medical-psychological follow up), indemnification, organization during the post-accident phase; 4 - conclusion and perspectives. (J.S.)

  20. Feedback Systems for Linear Colliders

    International Nuclear Information System (INIS)

    1999-01-01

    Feedback systems are essential for stable operation of a linear collider, providing a cost-effective method for relaxing tight tolerances. In the Stanford Linear Collider (SLC), feedback controls beam parameters such as trajectory, energy, and intensity throughout the accelerator. A novel dithering optimization system which adjusts final focus parameters to maximize luminosity contributed to achieving record performance in the 1997-98 run. Performance limitations of the steering feedback have been investigated, and improvements have been made. For the Next Linear Collider (NLC), extensive feedback systems are planned as an integral part of the design. Feedback requirements for JLC (the Japanese Linear Collider) are essentially identical to NLC; some of the TESLA requirements are similar but there are significant differences. For NLC, algorithms which incorporate improvements upon the SLC implementation are being prototyped. Specialized systems for the damping rings, rf and interaction point will operate at high bandwidth and fast response. To correct for the motion of individual bunches within a train, both feedforward and feedback systems are planned. SLC experience has shown that feedback systems are an invaluable operational tool for decoupling systems, allowing precision tuning, and providing pulse-to-pulse diagnostics. Feedback systems for the NLC will incorporate the key SLC features and the benefits of advancing technologies

  1. Best practices in identifying, reporting and screening operating experience at nuclear power plants

    International Nuclear Information System (INIS)

    2008-03-01

    IAEA Safety Standards Series No. SF-1 entitled Fundamental Safety Principles: Safety Fundamentals states the need for operating organizations to establish a programme for the collection and analysis of operating experience in nuclear power plants. Such a programme ensures that operating experience is analysed, events important to safety are reviewed in depth, lessons learned are disseminated to the staff of the organization and to relevant national and international organizations, and corrective actions are effectively implemented. This publication has been developed to provide advice and assistance to nuclear installations, and related institutions including contractors and support organizations to strengthen and enhance their own feedback process through the implementation of best practices in identifying, reporting and screening processes and to assess the effectiveness of the above areas. To support a proactive safety management approach the nuclear installations are enhancing the operating experience feedback (OEF) processes. For this purpose, the nuclear industry is striving to collect more information on occurrences that are useful to address the early signs of declining performance and improve operational safety performance. In this environment a strong reporting culture that motivates people to identify and report issues is an important attribute. As a consequence, the number and diversity of issues identified increases, and there is a need to set thresholds of screening for further treatment. Thus, the establishment of an effective identification, reporting and screening process is very beneficial to streamline the efforts, and ensure that major incidents and latent weaknesses are being addressed and that operating experience is treated according to its significance. This leads to improved safety and production. This publication was written to complement the publication IAEA Services Series No. 10 - PROSPER Guidelines - Guidelines for Peer Review and for

  2. Pseudo-Haptic Feedback in Teleoperation.

    Science.gov (United States)

    Neupert, Carsten; Matich, Sebastian; Scherping, Nick; Kupnik, Mario; Werthschutzky, Roland; Hatzfeld, Christian

    2016-01-01

    In this paper, we develop possible realizations of pseudo-haptic feedback in teleoperation systems based on existing works for pseudo-haptic feedback in virtual reality and the intended applications. We derive four potential factors affecting the performance of haptic feedback (calculation operator, maximum displacement, offset force, and scaling factor), which are analyzed in three compliance identification experiments. First, we analyze the principle usability of pseudo-haptic feedback by comparing information transfer measures for teleoperation and direct interaction. Pseudo-haptic interaction yields well above-chance performance, while direct interaction performs almost perfectly. In order to optimize pseudo-haptic feedback, in the second study we perform a full-factorial experimental design with 36 subjects performing 6,480 trials with 36 different treatments. Information transfer ranges from 0.68 bit to 1.72 bit in a task with a theoretical maximum of 2.6 bit, with a predominant effect of the calculation operator and a minor effect of the maximum displacement. In a third study, short- and long-term learning effects are analyzed. Learning effects regarding the performance of pseudo-haptic feedback cannot be observed for single-day experiments. Tests over 10 days show a maximum increase in information transfer of 0.8 bit. The results show the feasibility of pseudo-haptic feedback for teleoperation and can be used as design basis for task-specific systems.

  3. Global orbit feedback utilizing analog and digital technologies

    International Nuclear Information System (INIS)

    Singh, O.; Tang, Y.; Ramamoorthy, S.; Krinsky, S.; Yu, L.H.

    1997-01-01

    At the NSLS, an analog global orbit feedback system is used in regular operations, and a digital global orbit feedback system is available in machine physics studies on the X-Ray Ring. Here, the authors discuss the relative merits of utilizing analog and digital technology in orbit feedback. Results of experiments are reported characterizing the performance of the analog and digital systems when operated individually or together. They give their thoughts on plans for future development of the orbit feedback systems at the NSLS

  4. ICC Experiment Performance Improvement through Advanced Feedback Controllers for High-Power Low-Cost Switching Power Amplifiers

    International Nuclear Information System (INIS)

    Nelson, Brian A.

    2006-01-01

    Limited resources force most smaller fusion energy research experiments to have little or no feedback control of their operational parameters, preventing achievement of their full operational potential. Recent breakthroughs in high-power switching technologies have greatly reduced feedback-controlled power supply costs, primarily those classified as switching power amplifiers. However, inexpensive and flexible controllers for these power supplies have not been developed. A uClinux-based micro-controller (Analog Devices Blackfin BF537) was identified as having the capabilities to form the base of a digital control system for switching power amplifiers. A control algorithm was created, and a Linux character device driver was written to realize the algorithm. The software and algorithm were successfully tested on a switching power amplifier and magnetic field coil using University of Washington (subcontractor) resources

  5. Operating experience feedback report - Air systems problems

    International Nuclear Information System (INIS)

    Ornstein, H.L.

    1987-12-01

    This report highlights significant operating events involving observed or potential failures of safety-related systems in U.S. plants that resulted from degraded or malfunctioning non-safety grade air systems. Based upon the evaluation of these events, the Office for Analysis and Evaluation of Operational Data (AEOD) concludes that the issue of air systems problems is an important one which requires additional NRC and industry attention. This report also provides AEOD's recommendations for corrective actions to deal with the issue. (author)

  6. The use of SIPA 2 simulator for safety studies experience feedbacks and future developments

    International Nuclear Information System (INIS)

    Dumas, J.M.; Leteinturier, D.

    1999-01-01

    SIPA 2 experience feedbacks from the beginning of its use at IPSN in 1991 and trends for the next five years are presented. The simulator has been used for three applications: training of engineers working in safety analysis, preparation of national crisis drills, safety studies. In each application, experience feedbacks are analysed to show encountered advantages and difficulties. Trends for the next five years are: extension of the engineer training program (new training courses about normal operating conditions or about beyond design basis accidents), improvements in the validation of simulation configurations (in particular comparison with Cathare 2 new version results) increase of the simulation scope in connection with the SCAR project (taking into account the current power plant datapackage, the improvement of thermalhydraulic models, the extent of the system representation, new neutronic models and description of severe accident conditions). For each trend above, a detail of the planned actions is given. (author)

  7. Contribution of operating feedback to probabilistic safety studies

    International Nuclear Information System (INIS)

    Guio, J.M. de; Lannoy, A.

    1992-03-01

    This paper presents the method used for PWR unit operation feedback analysis and its contribution to probabilistic safety studies. The targets were as follows: - use of failure data banks to assess reliability parameters, - use of event data banks to identify and quantify main system initiating events, - determination of a standard operating profile. These studies, performed in the context of nuclear power plant safety programs, prove useful not only to safety engineers but also to equipment experts, designers, operators and maintenance specialists. They constitute basic data for studies in all these areas or the departure point for new investigations. (authors). 3 figs., 3 tabs., 3 refs

  8. Fast digital transverse feedback system for bunch train operation in CESR

    International Nuclear Information System (INIS)

    Rogers, J.T.; Billing, M.G.; Dobbins, J.A.

    1996-01-01

    We have developed a time domain transverse feedback system with the high bandwidth needed to control transverse instabilities when the CESR e + e - collider is filled with trains of closely spaced bunches. This system is based on parallel digital processors and a stripline driver. It is capable of acting on arbitrary patterns of bunches having a minimum spacing of 14 ns. Several simplifying features have been introduced. A single shorted stripline kicker driven by one power amplifier is used to control both counter-rotating beams. The desired feedback phase is achieved by sampling the bunch position at a single location on two independently selectable beam revolutions. The system adapts to changes in the betatron tune, bunch pattern, or desired damping rate through the loading of new parameters into the digital processors via the CESR control system. The feedback system also functions as a fast gated bunch current monitor. Both vertical and horizontal loops are now used in CESR operation. The measured betatron damping rates with the transverse feedback system in operation are in agreement with the analytical prediction and a computer simulation developed in connection with this work. (author)

  9. Fast digital transverse feedback system for bunch train operation in CESR

    Energy Technology Data Exchange (ETDEWEB)

    Rogers, J T; Billing, M G; Dobbins, J A [Cornell Univ., Ithaca, NY (United States). Lab. of Nuclear Studies; and others

    1996-08-01

    We have developed a time domain transverse feedback system with the high bandwidth needed to control transverse instabilities when the CESR e{sup +}e{sup -} collider is filled with trains of closely spaced bunches. This system is based on parallel digital processors and a stripline driver. It is capable of acting on arbitrary patterns of bunches having a minimum spacing of 14 ns. Several simplifying features have been introduced. A single shorted stripline kicker driven by one power amplifier is used to control both counter-rotating beams. The desired feedback phase is achieved by sampling the bunch position at a single location on two independently selectable beam revolutions. The system adapts to changes in the betatron tune, bunch pattern, or desired damping rate through the loading of new parameters into the digital processors via the CESR control system. The feedback system also functions as a fast gated bunch current monitor. Both vertical and horizontal loops are now used in CESR operation. The measured betatron damping rates with the transverse feedback system in operation are in agreement with the analytical prediction and a computer simulation developed in connection with this work. (author)

  10. New Quartz Crystal Oscillators Using the Current-Feedback Operational Amplifier

    OpenAIRE

    Muhammad Taher Abuelma'atti; Ahmad Al-Ghazwani

    2000-01-01

    New crystal oscillators using the current-feedback operational-amplifier (CFOA) are presented. Each circuit uses one CFOA, a crystal and, at most, five externally connected passive elements. Experimental results are included.

  11. Study on application of operating experience to new nuclear power plant

    International Nuclear Information System (INIS)

    Hong, Nam Pyo

    1991-01-01

    From the standpoint of designing the nuclear power plant, nine operating units have been designed and constructed as turn-key base by foreign Nuclear Steam Supply System (NSSS) Suppliers or as component base by foreign Architect/Engineer companies. In case of the component base project, the owner of electric company generally has merits that owner's operational experiences can be effectively incorporated from the beginning stage of design by A/E. Even though six nuclear units, Kori Units 3 and 4, Yonggwang Units 1 and 2, and Ulchin Units 1 and 2, were designed as component base by foreign A/E's, operational experience feedback from Kori Unit 1, such as design improvement and system upgrade, could not be reflected, because the design process of the following units started well ahead before Kori Unit 1 operating experience is obtained enough to reflect on future nuclear power plant design. It can be stated that foreign A/E's used their experience in designing nuclear projects on very limited basis

  12. Use of experience for the improvement of technical specifications for operation

    International Nuclear Information System (INIS)

    Schweitz, J.P.; Seveon, J.J.

    1987-11-01

    The lessons drawn from experience led EdF to define in 1980 a national specification standard, to be applied to the first standardized series of 900 MWe units and to be adapted to the later 1300 MWe units. This document is periodically revised, every two years or so, to take into account new trends in safety thinking and lessons learnt from operating experience. In this paper we present the main developments in the field of technical specifications, particularly: the definition of rules applicable in the event of unavailability of safety-related equipment, the integration of plant unit operating feedback for specifications optimization

  13. Operating experience feedback report -- turbine-generator overspeed protection systems: Commercial power reactors. Volume 11

    International Nuclear Information System (INIS)

    Ornstein, H.L.

    1995-04-01

    This report presents the results of the US Nuclear Regulatory Commission's Office for Analysis and Evaluation of Operational Data (AEOD) review of operating experience of main turbine-generator overspeed and overspeed protection systems. It includes an indepth examination of the turbine overspeed event which occurred on November 9, 1991, at the Salem Unit 2 Nuclear Power Plant. It also provides information concerning actions taken by other utilities and the turbine manufacturers as a result of the Salem overspeed event. AEOD's study reviewed operating procedures and plant practices. It noted differences between turbine manufacturer designs and recommendations for operations, maintenance, and testing, and also identified significant variations in the manner that individual plants maintain and test their turbine overspeed protection systems. AEOD's study provides insight into the shortcomings in the design, operation, maintenance, testing, and human factors associated with turbine overspeed protection systems. Operating experience indicates that the frequency of turbine overspeed events is higher than previously thought and that the bases for demonstrating compliance with NRC's General Design Criterion (GDC) 4, Environmental and dynamic effects design bases, may be nonconservative with respect to the assumed frequency

  14. Understanding Surgical Resident and Fellow Perspectives on Their Operative Performance Feedback Needs: A Qualitative Study.

    Science.gov (United States)

    Bello, Ricardo J; Sarmiento, Samuel; Meyer, Meredith L; Rosson, Gedge D; Cooney, Damon S; Lifchez, Scott D; Cooney, Carisa M

    2018-04-20

    Operative performance feedback is essential for surgical training. We aimed to understand surgical trainees' views on their operative performance feedback needs and to characterize feedback to elucidate factors affecting its value from the resident perspective. Using a qualitative research approach, 2 research fellows conducted semistructured, one-on-one interviews with surgical trainees. We analyzed recurring themes generated during interviews related to feedback characteristics, as well as the extent to which performance rating tools can help meet trainees' operative feedback needs. Departments or divisions of general or plastic surgery at 9 US academic institutions. Surgical residents and clinical fellows in general or plastic surgery. We conducted 30 interviews with 9 junior residents, 14 senior residents, and 7 clinical fellows. Eighteen (60%) participants were in plastic and 12 (40%) were in general surgery. Twenty-four participants (80%) reported feedback as very or extremely important during surgical training. All trainees stated that verbal, face-to-face feedback is the most valuable, especially if occurring during (92%) or immediately after (65%) cases. Of those trainees using performance rating tools (74%), most (57%) expressed positive views about them but wanted the tools to complement and not replace verbal feedback in surgical education. Trainees value feedback more if received within 1 week or the case. Verbal, face-to-face feedback is very or extremely important to surgical trainees. Residents and fellows prefer to receive feedback during or immediately after a case and continue to value feedback if received within 1 week of the event. Performance rating tools can be useful for providing formative feedback and documentation but should not replace verbal, face-to-face feedback. Considering trainee views on feedback may help reduce perceived gaps in feedback demand-versus-supply in surgical training, which may be essential to overcoming current

  15. Nuclear power plant operating experiences from the IAEA / Nea incident reporting system 2002-2005

    International Nuclear Information System (INIS)

    2006-01-01

    The Incident Reporting System (IRS) is an essential element of the international operating experience feedback system for nuclear power plants. The IRS is jointly operated and managed by the Nuclear Energy Agency (NEA), a semi-autonomous body within the Organisation for Economic Co-operation and Development (OECD), and the International Atomic Energy Agency (IAEA), a specialized agency within the United Nations System. (author)

  16. Operational experiences feedback in Bohunice NPP

    Energy Technology Data Exchange (ETDEWEB)

    Betak, A [NPP Bohunice (Slovakia)

    1997-10-01

    The presentation reviews the following issues: OEF team in Bohunice NPP - structure; training and qualification: ASSET seminars on Prevention of incidents - INES manual handling, NRA-NRC the training on event investigation methods, NU - the training on HPES; legislation - documentation prepared in the frame of QA programme; results of OEF team activities; ASSET mission Dukovany - Experiences; the perspective activities.

  17. Influence of visual feedback on human task performance in ITER remote handling

    Energy Technology Data Exchange (ETDEWEB)

    Schropp, Gwendolijn Y.R., E-mail: g.schropp@heemskerk-innovative.nl [Utrecht University, Utrecht (Netherlands); Heemskerk Innovative Technology, Noordwijk (Netherlands); Heemskerk, Cock J.M. [Heemskerk Innovative Technology, Noordwijk (Netherlands); Kappers, Astrid M.L.; Tiest, Wouter M. Bergmann [Helmholtz Institute-Utrecht University, Utrecht (Netherlands); Elzendoorn, Ben S.Q. [FOM-Institute for Plasma Physics Rijnhuizen, Association EURATOM/FOM, Partner in the Trilateral Euregio Clusterand ITER-NL, PO box 1207, 3430 BE Nieuwegein (Netherlands); Bult, David [FOM-Institute for Plasma Physics Rijnhuizen, Association EURATOM/FOM, Partner in the Trilateral Euregio Clusterand ITER-NL, PO box 1207, 3430 BE Nieuwegein (Netherlands)

    2012-08-15

    Highlights: Black-Right-Pointing-Pointer The performance of human operators in an ITER-like test facility for remote handling. Black-Right-Pointing-Pointer Different sources of visual feedback influence how fast one can complete a maintenance task. Black-Right-Pointing-Pointer Insights learned could be used in design of operator work environment or training procedures. - Abstract: In ITER, maintenance operations will be largely performed by remote handling (RH). Before ITER can be put into operation, safety regulations and licensing authorities require proof of maintainability for critical components. Part of the proof will come from using standard components and procedures. Additional verification and validation is based on simulation and hardware tests in 1:1 scale mockups. The Master Slave manipulator system (MS2) Benchmark Product was designed to implement a reference set of maintenance tasks representative for ITER remote handling. Experiments were performed with two versions of the Benchmark Product. In both experiments, the quality of visual feedback varied by exchanging direct view with indirect view (using video cameras) in order to measure and analyze its impact on human task performance. The first experiment showed that both experienced and novice RH operators perform a simple task significantly better with direct visual feedback than with camera feedback. A more complex task showed a large variation in results and could not be completed by many novice operators. Experienced operators commented on both the mechanical design and visual feedback. In a second experiment, a more elaborate task was tested on an improved Benchmark product. Again, the task was performed significantly faster with direct visual feedback than with camera feedback. In post-test interviews, operators indicated that they regarded the lack of 3D perception as the primary factor hindering their performance.

  18. Influence of visual feedback on human task performance in ITER remote handling

    International Nuclear Information System (INIS)

    Schropp, Gwendolijn Y.R.; Heemskerk, Cock J.M.; Kappers, Astrid M.L.; Tiest, Wouter M. Bergmann; Elzendoorn, Ben S.Q.; Bult, David

    2012-01-01

    Highlights: ► The performance of human operators in an ITER-like test facility for remote handling. ► Different sources of visual feedback influence how fast one can complete a maintenance task. ► Insights learned could be used in design of operator work environment or training procedures. - Abstract: In ITER, maintenance operations will be largely performed by remote handling (RH). Before ITER can be put into operation, safety regulations and licensing authorities require proof of maintainability for critical components. Part of the proof will come from using standard components and procedures. Additional verification and validation is based on simulation and hardware tests in 1:1 scale mockups. The Master Slave manipulator system (MS2) Benchmark Product was designed to implement a reference set of maintenance tasks representative for ITER remote handling. Experiments were performed with two versions of the Benchmark Product. In both experiments, the quality of visual feedback varied by exchanging direct view with indirect view (using video cameras) in order to measure and analyze its impact on human task performance. The first experiment showed that both experienced and novice RH operators perform a simple task significantly better with direct visual feedback than with camera feedback. A more complex task showed a large variation in results and could not be completed by many novice operators. Experienced operators commented on both the mechanical design and visual feedback. In a second experiment, a more elaborate task was tested on an improved Benchmark product. Again, the task was performed significantly faster with direct visual feedback than with camera feedback. In post-test interviews, operators indicated that they regarded the lack of 3D perception as the primary factor hindering their performance.

  19. Project and feedback experience on nuclear facility decommissioning

    Energy Technology Data Exchange (ETDEWEB)

    Santiago, J.L. [ENRESA (Spain); Benest, T.G. [United Kingdom Atomic Energy Authority, Windscale, Cumbria (United Kingdom); Tardy, F.; Lefevre, Ph. [Electricite de France (EDF/CIDEN), 69 - Villeurbanne (France); Willis, A. [VT Nuclear Services (United Kingdom); Gilis, R.; Lewandowski, P.; Ooms, B.; Reusen, N.; Van Laer, W.; Walthery, R. [Belgoprocess (Belgium); Jeanjacques, M. [CEA Saclay, 91 - Gif sur Yvette (France); Bohar, M.P.; Bremond, M.P.; Poyau, C.; Mandard, L.; Boissonneau, J.F.; Fouquereau, A.; Pichereau, E.; Binet, C. [CEA Fontenay aux Roses, 92 (France); Fontana, Ph.; Fraize, G. [CEA Marcoule 30 (France); Seurat, Ph. [AREVA NC, 75 - Paris (France); Chesnokov, A.V.; Fadin, S.Y.; Ivanov, O.P.; Kolyadin, V.I.; Lemus, A.V.; Pavlenko, V.I.; Semenov, S.G.; Shisha, A.D.; Volkov, V.G.; Zverkov, Y.A. [Russian Research Centre Kurchatov Inst., Moscow (Russian Federation)

    2008-11-15

    This series of 6 short articles presents the feedback experience that has been drawn from various nuclear facility dismantling and presents 3 decommissioning projects: first, the WAGR project that is the UK demonstration project for power reactor decommissioning (a review of the tools used to dismantle the reactor core); secondly, the dismantling project of the Bugey-1 UNGG reactor for which the dismantling works of the reactor internals is planned to be done underwater; and thirdly, the decommissioning project of the MR reactor in the Kurchatov Institute. The feedback experience described concerns nuclear facilities in Spain (Vandellos-1 and the CIEMAT research center), in Belgium (the Eurochemic reprocessing plant), and in France (the decommissioning of nuclear premises inside the Fontenay-aux-roses Cea center and the decommissioning of the UP1 spent fuel reprocessing plant at the Marcoule site). (A.C.)

  20. Project and feedback experience on nuclear facility decommissioning

    International Nuclear Information System (INIS)

    Santiago, J.L.; Benest, T.G.; Tardy, F.; Lefevre, Ph.; Willis, A.; Gilis, R.; Lewandowski, P.; Ooms, B.; Reusen, N.; Van Laer, W.; Walthery, R.; Jeanjacques, M.; Bohar, M.P.; Bremond, M.P.; Poyau, C.; Mandard, L.; Boissonneau, J.F.; Fouquereau, A.; Pichereau, E.; Binet, C.; Fontana, Ph.; Fraize, G.; Seurat, Ph.; Chesnokov, A.V.; Fadin, S.Y.; Ivanov, O.P.; Kolyadin, V.I.; Lemus, A.V.; Pavlenko, V.I.; Semenov, S.G.; Shisha, A.D.; Volkov, V.G.; Zverkov, Y.A.

    2008-01-01

    This series of 6 short articles presents the feedback experience that has been drawn from various nuclear facility dismantling and presents 3 decommissioning projects: first, the WAGR project that is the UK demonstration project for power reactor decommissioning (a review of the tools used to dismantle the reactor core); secondly, the dismantling project of the Bugey-1 UNGG reactor for which the dismantling works of the reactor internals is planned to be done underwater; and thirdly, the decommissioning project of the MR reactor in the Kurchatov Institute. The feedback experience described concerns nuclear facilities in Spain (Vandellos-1 and the CIEMAT research center), in Belgium (the Eurochemic reprocessing plant), and in France (the decommissioning of nuclear premises inside the Fontenay-aux-roses Cea center and the decommissioning of the UP1 spent fuel reprocessing plant at the Marcoule site). (A.C.)

  1. Maintenance analysis method and operational feedback: a comprehensive maintenance management

    International Nuclear Information System (INIS)

    Mathieu Riou; Victor Planchon

    2006-01-01

    Full text of publication follows: Current periodic inspections program carried out on the COGEMA LOGISTICS casks is required by regulations and approved by the competent Authority. Thus, Safety and casks conformity to the according certificate of approval are guaranteed. Nonetheless, based on experience it appeared that some maintenance operations did not seem relevant or were redundant. Then, it was decided to rethink completely our maintenance program to reach the following objectives: - Set up the 'a minima' required inspection operations required to guarantee Safety and conformity to the certificate of approval, - Optimize criteria and periodicities of inspections taking into account: operational feedback, routine inspections carried out for each transport, regulations, environmental impact (ALARA, waste reduction,...), cost-effectiveness (reduction of cask's immobilization period,...). - Set up a maintenance program in Safety Analysis Reports that: stands alone (no need to check the specification or the certificate of approval to have the complete list of inspections mandatory to guarantee Safety), gives objectives instead of means of controls. This approach needs then to be re-evaluated by the competent Authority. Study's scope has been limited to the TN TM 12 cask family which is intensely used. COGEMA LOGISTICS has a high operational feedback on these casks. After Authority agreement, and in accordance with its requirements, study will then be extended to the other casks belonging to the COGEMA LOGISTICS cask fleet. Actually, the term 'maintenance' is linked to 'Base maintenance' and 'Main maintenance' and implicitly means that the cask is immobilized for a given period. To emphasize the modifications, the term 'maintenance' is no longer used and is substituted by 'periodic upkeep'. By changing the name, COGEMA LOGISTICS wants to emphasize that: some operations can for instance be realized while the cask is unloaded, periodicities are thought in terms of

  2. Lessons Learned from Missing Flooding Barriers Operating Experience

    International Nuclear Information System (INIS)

    Simic, Z.; Veira, M. P.

    2016-01-01

    Flooding hazard is highly significant for nuclear power plant safety because of its potential for common cause impact on safety related systems, and because operating experience reviews regularly identify flooding as a cause of concern. Source of the flooding could be external (location) or internal (plant design). The amount of flooding water could vary but even small amount might suffice to affect redundant trains of safety related systems for power supply and cooling. The protection from the flooding is related to the design-basis flood level (DBFL) and it consists of three elements: structural, organizational and accessibility. Determination of the DBFL is critical, as Fukushima Daiichi accident terribly proved. However, as the topic of flooding is very broad, the scope of this paper is focused only on the issues related to the missing flood barriers. Structural measures are physically preventing flooding water to reach or damage safety related system, and they could be permanent or temporary. For temporary measures it is important to have necessary material, equipment and organizational capacity for the timely implementation. Maintenance is important for permanent protection and periodical review is important for assuring readiness and feasibility of temporary flooding protection. Final flooding protection element is assured accessibility to safety related systems during the flooding. Appropriate flooding protection is based on the right implementation of design requirements, proper maintenance and periodic reviews. Operating experience is constantly proving how numerous water sources and systems interactions make flooding protection challenging. This paper is presenting recent related operating experience feedback involving equipment, procedures and analysis. Most frequent deficiencies are: inadequate, degraded or missing seals that would allow floodwaters into safety related spaces. Procedures are inadequate typically because they underestimate necessary

  3. Feedback control and stabilization experiments on the Texas Experimental Tokamak (TEXT)

    International Nuclear Information System (INIS)

    Uckan, T.; Carreras, B.A.; Richards, B.; Wootton, A.J.; Bengtson, R.D.; Bravenec, R.; Li, G.X.; Hurwitz, P.D.; Phillips, P.E.; Rowan, W.L.

    1994-06-01

    Plasma edge feedback experiments on the Texas Experimental Tokamak (TEXT) have been successful in controlling the edge plasma potential fluctuation level. The feedback wave-launcher, consisting of electrostatic probes located in the shadow of the limiter, is driven by the local edge potential fluctuations. In general, the edge potential fluctuations are modified in a broad frequency band. Moreover, it is observed that the potential fluctuations can be reduced (≤100 kHz) without enhancing other modes, or excited (10 to 12 kHz), depending on the phase difference between the driver and the launcher signal, and gain of the system. This turbulence modification is achieved not only locally but also halfway around the torus and has about 2 cm of poloidal extent. Experiments on the characterization of the global plasma parameters with the edge feedback are discussed. Effects of the edge feedback on the estimated fluctuation-induced radial particle flux as well as on the local plasma parameters are presented

  4. Best practices in the utilization and dissemination of operating experience at nuclear power plants

    International Nuclear Information System (INIS)

    2008-03-01

    IAEA Safety Standards Series No. SF-1 entitled Fundamental Safety Principles: Safety Fundamentals states the need for operating organizations to establish a programme for the collection and analysis of operating experience in nuclear power plants. Such a programme ensures that operating experience is analysed, events important to safety are reviewed in depth, lessons learned are disseminated to the staff of the organization and to relevant national and international organizations, operating experience is utilized and corrective actions are effectively implemented. This publication has been developed to provide advice and assistance to nuclear installations and related institutions, including contractors and support organizations, to strengthen and enhance their own feedback process through the implementation of best practices in the utilization and dissemination of operating experience and to assess their effectiveness. Dissemination and utilization of internal and external operating experience is essential in supporting a proactive safety management approach of preventing events from occurring. Few new events reveal a completely new cause or failure mechanism. Although not recognized prior to the event, most subsequent investigations identify internal or external industry operating experience that, if applied effectively, would have prevented the event. Therefore, the establishment of an effective utilization and dissemination process is very beneficial in raising awareness of the organization and individuals of available operating experience, and focussing effort in the implementation of the lessons learnt. This leads to improved safety and reliability. The present publication is the outcome of a coordinated effort involving the participation of experts of nuclear organizations in several Member States. It was written to complement the publication IAEA Services Series No. 10 entitled PROSPER Guidelines - Guidelines for Peer Review and for Plant Self-assessment of

  5. Performance evaluation of a robot-assisted catheter operating system with haptic feedback.

    Science.gov (United States)

    Song, Yu; Guo, Shuxiang; Yin, Xuanchun; Zhang, Linshuai; Hirata, Hideyuki; Ishihara, Hidenori; Tamiya, Takashi

    2018-06-20

    In this paper, a novel robot-assisted catheter operating system (RCOS) has been proposed as a method to reduce physical stress and X-ray exposure time to physicians during endovascular procedures. The unique design of this system allows the physician to apply conventional bedside catheterization skills (advance, retreat and rotate) to an input catheter, which is placed at the master side to control another patient catheter placed at the slave side. For this purpose, a magnetorheological (MR) fluids-based master haptic interface has been developed to measure the axial and radial motions of an input catheter, as well as to provide the haptic feedback to the physician during the operation. In order to achieve a quick response of the haptic force in the master haptic interface, a hall sensor-based closed-loop control strategy is employed. In slave side, a catheter manipulator is presented to deliver the patient catheter, according to position commands received from the master haptic interface. The contact forces between the patient catheter and blood vessel system can be measured by designed force sensor unit of catheter manipulator. Four levels of haptic force are provided to make the operator aware of the resistance encountered by the patient catheter during the insertion procedure. The catheter manipulator was evaluated for precision positioning. The time lag from the sensed motion to replicated motion is tested. To verify the efficacy of the proposed haptic feedback method, the evaluation experiments in vitro are carried out. The results demonstrate that the proposed system has the ability to enable decreasing the contact forces between the catheter and vasculature.

  6. Operation and performance of a longitudinal feedback system using digital signal processing

    International Nuclear Information System (INIS)

    Teytelman, D.; Fox, J.; Hindi, H.

    1994-01-01

    A programmable longitudinal feedback system using a parallel array of AT ampersand T 1610 digital signal processors has been developed as a component of the PEP-II R ampersand D program. This system has been installed at the Advanced Light Source (LBL) and implements full speed bunch by bunch signal processing for storage rings with bunch spacing of 4ns. Open and closed loop results showing the action of the feedback system are presented, and the system is shown to damp coupled-bunch instabilities in the ALS. A unified PC-based software environment for the feedback system operation is also described

  7. Orbit Feedback Operation with RCBX (MD 1209)

    CERN Document Server

    Wenninger, Jorg; Nisbet, David; Ponce, Laurette; Louro Alves, Diogo Miguel; CERN. Geneva. ATS Department

    2017-01-01

    The LHC Orbit Feedback (OFB) is able to drive any orbit corrector circuit (COD) to steer the LHC orbit. But during the first feedback tests in 2010, all attempts to use the common triplet orbit correctors (MCBX) failed because the QPS system installed to protect those magnets triggered power aborts as soon as the OFB steered the beam with those CODs. The reason was most likely the violation of the RCBX circuit acceleration limits. For this reason the MCBX orbit correctors were never driven by the OFB in regular operation. Although the performance of the OFB is generally excellent, the quality of the beam steering around IRs could be improved if the OFB could correct the orbit with the MCBX to counteract locally triplet quadrupole movements. The aim of this MD was to make a new attempt to use the MCBX in the OFB. The test was successful at injection (no circuit trip) and failed during the ramp (QPS power abort). The PC voltages and QPS Ures signals revealed the presence of voltage spikes with a period of 10~s...

  8. Influence of a new generation of operations support systems on current spacecraft operations philosophy: The users feedback

    Science.gov (United States)

    Darroy, Jean Michel

    1993-01-01

    Current trends in the spacecraft mission operations area (spacecraft & mission complexity, project duration, required flexibility are requiring a breakthrough for what concerns philosophy, organization, and support tools. A major evolution is related to space operations 'informationalization', i.e adding to existing operations support & data processing systems a new generation of tools based on advanced information technologies (object-oriented programming, artificial intelligence, data bases, hypertext) that automate, at least partially, operations tasks that used be performed manually (mission & project planning/scheduling, operations procedures elaboration & execution, data analysis & failure diagnosis). All the major facets of this 'informationalization' are addressed at MATRA MARCONI SPACE, operational applications were fielded and generic products are becoming available. These various applications have generated a significant feedback from the users (at ESA, CNES, ARIANESPACE, MATRA MARCONI SPACE), which is now allowing us to precisely measure how the deployment of this new generation of tools, that we called OPSWARE, can 'reengineer' current spacecraft mission operations philosophy, how it can make space operations faster, better, and cheaper. This paper can be considered as an update of the keynote address 'Knowledge-Based Systems for Spacecraft Control' presented during the first 'Ground Data Systems for Spacecraft Control' conference in Darmstadt, June 1990, with a special emphasis on these last two years users feedback.

  9. Ageing degradation mechanisms in nuclear power plants: lessons learned from operating experience

    International Nuclear Information System (INIS)

    Bieth, M.; Zerger, B.; Duchac, A.

    2014-01-01

    This paper presents main results of a comprehensive study performed by the European Clearinghouse on Operating Experience Feedback of Nuclear Power Plants (NPP) with the support of IRSN (Institut de Surete Nucleaire et de Radioprotection) and GRS (Gesellschaft fuer Anlagen und Reaktorsicherheit mbH). Physical ageing mechanisms of Structures, Systems and Components (SSC) that eventually lead to ageing related systems and components failures at nuclear power plants were the main focus of this study. The analysis of ageing related events involved operating experience reported by NPP operators in France, Germany, USA and to the IAEA/NEA International Reporting System on operating experience for the past 20 years. A list of relevant ageing related events was populated. Each ageing related event contained in the list was analyzed and results of analysis were summarized for each ageing degradation mechanism which appeared to be the dominant contributor or direct cause. This paper provides insights into ageing related operating experience as well as recommendations to deal with the physical ageing of nuclear power plant SSC important to safety. (authors)

  10. Auditory display as feedback for a novel eye-tracking system for sterile operating room interaction.

    Science.gov (United States)

    Black, David; Unger, Michael; Fischer, Nele; Kikinis, Ron; Hahn, Horst; Neumuth, Thomas; Glaser, Bernhard

    2018-01-01

    The growing number of technical systems in the operating room has increased attention on developing touchless interaction methods for sterile conditions. However, touchless interaction paradigms lack the tactile feedback found in common input devices such as mice and keyboards. We propose a novel touchless eye-tracking interaction system with auditory display as a feedback method for completing typical operating room tasks. Auditory display provides feedback concerning the selected input into the eye-tracking system as well as a confirmation of the system response. An eye-tracking system with a novel auditory display using both earcons and parameter-mapping sonification was developed to allow touchless interaction for six typical scrub nurse tasks. An evaluation with novice participants compared auditory display with visual display with respect to reaction time and a series of subjective measures. When using auditory display to substitute for the lost tactile feedback during eye-tracking interaction, participants exhibit reduced reaction time compared to using visual-only display. In addition, the auditory feedback led to lower subjective workload and higher usefulness and system acceptance ratings. Due to the absence of tactile feedback for eye-tracking and other touchless interaction methods, auditory display is shown to be a useful and necessary addition to new interaction concepts for the sterile operating room, reducing reaction times while improving subjective measures, including usefulness, user satisfaction, and cognitive workload.

  11. Achievement of radiative feedback control for long-pulse operation on EAST

    Science.gov (United States)

    Wu, K.; Yuan, Q. P.; Xiao, B. J.; Wang, L.; Duan, Y. M.; Chen, J. B.; Zheng, X. W.; Liu, X. J.; Zhang, B.; Xu, J. C.; Luo, Z. P.; Zang, Q.; Li, Y. Y.; Feng, W.; Wu, J. H.; Yang, Z. S.; Zhang, L.; Luo, G.-N.; Gong, X. Z.; Hu, L. Q.; Hu, J. S.; Li, J.

    2018-05-01

    The active feedback control of radiated power to prevent divertor target plates overheating during long-pulse operation has been developed and implemented on EAST. The radiation control algorithm, with impurity seeding via a supersonic molecular beam injection (SMBI) system, has shown great success in both reliability and stability. By seeding a sequence of short neon (Ne) impurity pulses with the SMBI from the outer mid-plane, the radiated power of the bulk plasma can be well controlled, and the duration of radiative control (feedforward and feedback) is 4.5 s during a discharge of 10 s. Reliable control of the total radiated power of bulk plasma has been successfully achieved in long-pulse upper single null (USN) discharges with a tungsten divertor. The achieved control range of {{f}rad} is 20%–30% in L-mode regimes and 18%–36% in H-mode regimes. The temperature of the divertor target plates was maintained at a low level during the radiative control phase. The peak particle flux on the divertor target was decreased by feedforward Ne injection in the L-mode discharges, while the Ne pulses from the SMBI had no influence on the peak particle flux because of the very small injecting volume. It is shown that although the radiated power increased, no serious reduction of plasma-stored energy or confinement was observed during the control phase. The success of the radiation control algorithm and current experiments in radiated power control represents a significant advance for steady-state divertor radiation and heat flux control on EAST for near-future long-pulse operation.

  12. Understanding Arts and Humanities Students' Experiences of Assessment and Feedback

    Science.gov (United States)

    Adams, Joelle; McNab, Nicole

    2013-01-01

    This article examines how undergraduate students on arts and humanities courses experience assessment and feedback. The research uses a detailed audit, a specially devised questionnaire (the Assessment Experience Questionnaire), and student focus group data, and the article examines results from 19 programmes, comparing those from "arts and…

  13. Instructor feedback versus no instructor feedback on performance in a laparoscopic virtual reality simulator: a randomized trial.

    Science.gov (United States)

    Strandbygaard, Jeanett; Bjerrum, Flemming; Maagaard, Mathilde; Winkel, Per; Larsen, Christian Rifbjerg; Ringsted, Charlotte; Gluud, Christian; Grantcharov, Teodor; Ottesen, Bent; Sorensen, Jette Led

    2013-05-01

    To investigate the impact of instructor feedback versus no instructor feedback when training a complex operational task on a laparoscopic virtual reality simulator. : Simulators are now widely accepted as a training tool, but there is insufficient knowledge about how much feedback is necessary, which is useful for sustainable implementation. A randomized trial complying with CONSORT Statement. All participants had to reach a predefined proficiency level for a complex operational task on a virtual reality simulator. The intervention group received standardized instructor feedback a maximum of 3 times. The control group did not receive instructor feedback. Participants were senior medical students without prior laparoscopic experience (n = 99). Outcome measures were time, repetitions, and performance score to reach a predefined proficiency level. Furthermore, influence of sex and perception of own surgical skills were examined. Time (in minutes) and repetitions were reduced in the intervention group (162 vs 342 minutes; P less time (in minutes) than women (P = 0.037), but no sex difference was observed for repetitions (P = 0.20). Participants in the intervention group had higher self-perception regarding surgical skills after the trial (P = 0.011). Instructor feedback increases the efficiency when training a complex operational task on a virtual reality simulator; time and repetitions used to achieve a predefined proficiency level were significantly reduced in the group that received instructor feedback compared with the control group. NCT01497782.

  14. The Effects of Active Videogame Feedback and Practicing Experience on Children's Physical Activity Intensity and Enjoyment.

    Science.gov (United States)

    Chen, Han; Sun, Haichun

    2017-08-01

    The study aims to explore the effects of receiving active videogame (AVG) feedback and playing experience on individuals' moderate-to-vigorous physical activity (MVPA) and perceived enjoyment. This was a within-subject design study. The participants included 36 (n = 15 and 21 for boys and girls, respectively) fourth graders enrolled in a rural elementary school in southern Georgia area. The experiment lasted for 6 weeks with each week including three sessions. The participants were assigned in either front row (sensor feedback) or back row (no sensor feedback) during practice, which was alternated in different sessions. Two different dance games were played during the study with each game implemented for 3 weeks. The MVPA was measured with GT3X+ accelerometers. Physical activity (PA) enjoyment was assessed after the completion of the first two and last two sessions of each game. A repeated one-way ANOVA (analysis of variance) was used to examine the effects of AVG feedback and game on MVPA. A repeated one-way MANOVA (multivariate analysis of variance) was conducted for each game to examine the effects of experience and AVG feedback on enjoyment and MVPA. No effects of AVG feedback were found for MVPA or enjoyment (P > 0.05). The effects of experience on MVPA were found for Just Dance Kids 2014 with experience decreased MVPA (P < 0.05). Students who practiced dance AVG without receiving feedback still demonstrated positive affection and accumulated similar MVPA than when practicing while receiving feedback. Experience for certain dance games tends to decrease PA intensity.

  15. Optimal feedback control successfully explains changes in neural modulations during experiments with brain-machine interfaces

    Directory of Open Access Journals (Sweden)

    Miriam eZacksenhouse

    2015-05-01

    Full Text Available Recent experiments with brain-machine-interfaces (BMIs indicate that the extent of neural modulations increased abruptly upon starting to operate the interface, and especially after the monkey stopped moving its hand. In contrast, neural modulations that are correlated with the kinematics of the movement remained relatively unchanged. Here we demonstrate that similar changes are produced by simulated neurons that encode the relevant signals generated by an optimal feedback controller during simulated BMI experiments. The optimal feedback controller relies on state estimation that integrates both visual and proprioceptive feedback with prior estimations from an internal model. The processing required for optimal state estimation and control were conducted in the state-space, and neural recording was simulated by modeling two populations of neurons that encode either only the estimated state or also the control signal. Spike counts were generated as realizations of doubly stochastic Poisson processes with linear tuning curves. The model successfully reconstructs the main features of the kinematics and neural activity during regular reaching movements. Most importantly, the activity of the simulated neurons successfully reproduces the observed changes in neural modulations upon switching to brain control. Further theoretical analysis and simulations indicate that increasing the process noise during normal reaching movement results in similar changes in neural modulations. Thus we conclude that the observed changes in neural modulations during BMI experiments can be attributed to increasing process noise associated with the imperfect BMI filter, and, more directly, to the resulting increase in the variance of the encoded signals associated with state estimation and the required control signal.

  16. Optimal feedback control successfully explains changes in neural modulations during experiments with brain-machine interfaces.

    Science.gov (United States)

    Benyamini, Miri; Zacksenhouse, Miriam

    2015-01-01

    Recent experiments with brain-machine-interfaces (BMIs) indicate that the extent of neural modulations increased abruptly upon starting to operate the interface, and especially after the monkey stopped moving its hand. In contrast, neural modulations that are correlated with the kinematics of the movement remained relatively unchanged. Here we demonstrate that similar changes are produced by simulated neurons that encode the relevant signals generated by an optimal feedback controller during simulated BMI experiments. The optimal feedback controller relies on state estimation that integrates both visual and proprioceptive feedback with prior estimations from an internal model. The processing required for optimal state estimation and control were conducted in the state-space, and neural recording was simulated by modeling two populations of neurons that encode either only the estimated state or also the control signal. Spike counts were generated as realizations of doubly stochastic Poisson processes with linear tuning curves. The model successfully reconstructs the main features of the kinematics and neural activity during regular reaching movements. Most importantly, the activity of the simulated neurons successfully reproduces the observed changes in neural modulations upon switching to brain control. Further theoretical analysis and simulations indicate that increasing the process noise during normal reaching movement results in similar changes in neural modulations. Thus, we conclude that the observed changes in neural modulations during BMI experiments can be attributed to increasing process noise associated with the imperfect BMI filter, and, more directly, to the resulting increase in the variance of the encoded signals associated with state estimation and the required control signal.

  17. STUDENTS’ PERCEPTIONS OF THEIR REFLECTIVE ESSAY WRITING EXPERIENCE AND TEACHER FEEDBACK COMMENTS

    Directory of Open Access Journals (Sweden)

    Asiah Mohd Sharif

    2017-01-01

    Full Text Available Reflection which encompasses critical and analytical capabilities is a critical 21st century skill for students to develop. To ensure students are equipped with this skill, reflective writing has been identified as a possible tool. Teacher feedback on students’ written output therefore plays a role in developing students’ reflective skills. This study asks two questions: How do students perceive their experience writing reflective essays? What is the nature of the teacher’s feedback comments on students’ reflective essays and how do students perceive them? To answer these questions, nineteen ESL students in an entry-level Medical programme completed a questionnaire concerning their experiences writing reflective essays and perceptions of teacher feedback on these essays. Interviews were conducted with two students to follow-up on questionnaire responses. The content analysis showed that the students believed reflective writing played a small contribution to their language learning. Further investigation into the students’ perspectives of their teachers’ feedback comments suggests that even though the teachers’ feedback was positive, the students also referred to the comments as inadequate and ineffective. Pedagogical implications and suggestions for future research are discussed.

  18. Influence of Force and Torque Feedback on Operator Performance in a VR-Based Suturing Task

    Directory of Open Access Journals (Sweden)

    L. Santos-Carreras

    2010-01-01

    Full Text Available The introduction of Minimally Invasive Surgery (MIS has revolutionised surgical care, considerably improving the quality of many surgical procedures. Technological advances, particularly in robotic surgery systems, have reduced the complexity of such an approach, paving the way for even less invasive surgical trends. However, the fact that haptic feedback has been progressively lost through this transition is an issue that to date has not been solved. Whereas traditional open surgery provides full haptic feedback, the introduction of MIS has eliminated the possibility of direct palpation and tactile exploration. Nevertheless, these procedures still provide a certain amount of force feedback through the rigid laparoscopic tool. Many of the current telemanipulated robotic surgical systems in return do not provide full haptic feedback, which to a certain extent can be explained by the requirement of force sensors integrated into the tools of the slave robot and actuators in the surgeon’s master console. In view of the increased complexity and cost, the benefit of haptic feedback is open to dispute. Nevertheless, studies have shown the importance of haptic feedback, especially when visual feedback is unreliable or absent. In order to explore the importance of haptic feedback for the surgeon’s master console of a novel teleoperated robotic surgical system, we have identified a typical surgical task where performance could potentially be improved by haptic feedback, and investigate performance with and without this feedback. Two rounds of experiments are performed with 10 subjects, six of them with a medical background. Results show that feedback conditions, including force feedback, significantly improve task performance independently of the operator’s suturing experience. There is, however, no further significant improvement when torque feedback is added. Consequently, it is deduced that force feedback in translations improves subject

  19. Vibrotactile Feedback for Brain-Computer Interface Operation

    OpenAIRE

    Cincotti, Febo; Kauhanen, Laura; Aloise, Fabio; Palomäki, Tapio; Caporusso, Nicholas; Jylänki, Pasi; Mattia, Donatella; Babiloni, Fabio; Vanacker, Gerolf; Nuttin, Marnix; Marciani, Maria Grazia; Millán, José del R.

    2007-01-01

    To be correctly mastered, brain-computer interfaces (BCIs) need an uninterrupted flow of feedback to the user. This feedback is usually delivered through the visual channel. Our aim was to explore the benefits of vibrotactile feedback during users' training and control of EEG-based BCI applications. A protocol for delivering vibrotactile feedback, including specific hardware and software arrangements, was specified. In three studies with 33 subjects (i...

  20. Current feedback operational amplifiers as fast charge sensitive preamplifiers for photomultiplier read out

    Energy Technology Data Exchange (ETDEWEB)

    Giachero, A; Gotti, C; Maino, M; Pessina, G, E-mail: claudio.gotti@mib.infn.it [INFN - Sezione di Milano-Bicocca, I-20126, Milano (Italy)

    2011-05-01

    Fast charge sensitive preamplifiers were built using commercial current feedback operational amplifiers for fast read out of charge pulses from a photomultiplier tube. Current feedback opamps prove to be particularly well suited for this application where the charge from the detector is large, of the order of one million electrons, and high timing resolution is required. A proper circuit arrangement allows very fast signals, with rise times down to one nanosecond, while keeping the amplifier stable. After a review of current feedback circuit topology and stability constraints, we provide a 'recipe' to build stable and very fast charge sensitive preamplifiers from any current feedback opamp by adding just a few external components. The noise performance of the circuit topology has been evaluated and is reported in terms of equivalent noise charge.

  1. Evolution of the feedback from experience on degradations of French nuclear power plants condensers and foreseen solutions

    Energy Technology Data Exchange (ETDEWEB)

    Mayos, M.; Chanel, F.; Copin, E.; Carlier, L. [EDF/DIN/CEIDRE, Saint-Denis (France); Coquio, N.; Garbay, E. [EDF/DIN/CEIDRE, Avoine (France); Bastian, C. [EDF/DPN/UNIE, Saint-Denis (France)

    2011-07-01

    The materials constituting the condenser tubes of French nuclear power plants display a great diversity and are subject to different degradations, known from the operational feedback from experience. Copper alloys (mainly brass), which were bound to disappear in renovated condensers, are still significantly present, due to their unique bacteriostatic ability. Brass tubes lifetime is still governed in general by steady abrasion, as evaluated by eddy current nondestructive testing. However, an atypical NDE (non-destructive evaluation) behavior has led to spot a new damage: localized under-deposit pitting corrosion on the raw water side, caused by the particular quality of water chemistry and heavy scaling of the tube surface. This damage is likely to overcome steady abrasion for tube life prediction. Prevention includes a tighter look at NDE indications and improved descaling solutions (chemical or mechanical). Other specific damages have been reported from operation feedback: the main one was accidental stress corrosion cracking, which has occurred on some recently renovated brass condenser tube bundles. Thanks to a metallurgical and mechanical study, its cause was found in the manufacturing process. This experience has resulted in tightened specifications for brass tubes manufacturing. Stainless steel and titanium still appear more damage-resistant and represent a safe solution when no microorganism issue is present. The degradation feedback, confirmed by NDE inspections, is very low in French power plants. However, titanium hydriding still represents an issue when cathodic protection is present. Furthermore, some other damages have been reported on titanium, like isolated steam erosion. Vibration fatigue damage has been observed on stainless steel tubes, but it is more in relationship with the condenser design than with the material itself. (authors)

  2. Operational safety of nuclear power plants

    International Nuclear Information System (INIS)

    Tanguy, P.

    1987-01-01

    The operational safety of nuclear power plants has become an important safety issue since the Chernobyl accident. A description is given of the various aspects of operational safety, including the importance of human factors, responsibility, the role and training of the operator, the operator-machine interface, commissioning and operating procedures, experience feedback, and maintenance. The lessons to be learnt from Chernobyl are considered with respect to operator errors and the management of severe accidents. Training of personnel, operating experience feedback, actions to be taken in case of severe accidents, and international cooperation in the field of operational safety, are also discussed. (U.K.)

  3. Feedback stabilization experiments using l = 2 equilibrium windings in Scyllac

    International Nuclear Information System (INIS)

    Bartsch, R.R.; Cantrell, E.L.; Gribble, R.F.; Freese, K.B.; Handy, L.E.; Kristal, R.; Miller, G.; Quinn, W.E.

    1977-01-01

    The confinement time in the Scyllac Sector Feedback Experiment has been extended with a pre-programmed equilibrium compensation force. This force was produced by driving a current with a flexible waveform in an additional set of l = 2 windings

  4. Assessment of Habitat Suitability Is Affected by Plant-Soil Feedback: Comparison of Field and Garden Experiment.

    Directory of Open Access Journals (Sweden)

    Lucie Hemrová

    Full Text Available Field translocation experiments (i.e., the introduction of seeds or seedlings of different species into different localities are commonly used to study habitat associations of species, as well as factors limiting species distributions and local abundances. Species planted or sown in sites where they naturally occur are expected to perform better or equally well compared to sites at which they do not occur or are rare. This, however, contrasts with the predictions of the Janzen-Connell hypothesis and commonly reported intraspecific negative plant-soil feedback. The few previous studies indicating poorer performance of plants at sites where they naturally occur did not explore the mechanisms behind this pattern.In this study, we used field translocation experiments established using both seeds and seedlings to study the determinants of local abundance of four dominant species in grasslands. To explore the possible effects of intraspecific negative plant-soil feedback on our results, we tested the effect of local species abundance on the performance of the plants in the field experiment. In addition, we set up a garden experiment to explore the intensity of intraspecific as well as interspecific feedback between the dominants used in the experiment.In some cases, the distribution and local abundances of the species were partly driven by habitat conditions at the sites, and species performed better at their own sites. However, the prevailing pattern was that the local dominants performed worse at sites where they naturally occur than at any other sites. Moreover, the success of plants in the field experiment was lower in the case of higher intraspecific abundance prior to experimental setup. In the garden feedback experiment, two of the species performed significantly worse in soils conditioned by their species than in soils conditioned by the other species. In addition, the performance of the plants was significantly correlated between the two

  5. Best Practices in the Management of an Operating Experience Programme at Nuclear Power Plants

    International Nuclear Information System (INIS)

    2010-08-01

    The IAEA Fundamental Safety Principles (IAEA Safety Standards Series No. SF-1) state the need for operating organizations to establish a programme for the feedback and analysis of operating experience in nuclear power plants. Such a programme ensures that operating experience is analysed, events important to safety are reviewed in depth, lessons learned are disseminated to the staff of the organization and to the relevant national and international organizations and corrective actions are effectively implemented. In IAEA Operational Safety Review Team (OSART) and Peer Review of the effectiveness of the Operational Safety Performance Experience Review (PROSPER) missions, weaknesses in the management of operating experience (OE) programmes have been identified as one of the root causes of the recurrence of events. This publication has been developed to provide advice and assistance to nuclear installation managers and related institutions, including contractors and support organizations, to strengthen and enhance the management of their OE processes. In this publication, a number of barriers to the successful management of an OE programme have been identified. Managers are encouraged to review and evaluate these barriers with a view to identifying and eliminating them within their own organizations

  6. Final analysis of the engineering data on the scyllac feedback stabilization experiment

    International Nuclear Information System (INIS)

    Kutac, K.J.; Kewish, R.W.; Miller, G.; Gribble, R.F.

    1977-01-01

    The feedback stabilization system consists of four basic components: plasma position detectors, a signal processor or mode analyzer driven by the position detector signals, power amplifiers which are driven by the mode analyzer, and feedback load coils driven by the power amplifiers. A short description of each of the four components of the system is presented. The location of the components in the experiment is shown

  7. An evaluation of the feedback loops in the poverty focus of world bank operations.

    Science.gov (United States)

    Fardoust, Shahrokh; Kanbur, Ravi; Luo, Xubei; Sundberg, Mark

    2018-04-01

    The World Bank Group in 2013 made the elimination of extreme poverty by 2030 a central institutional focus and purpose. This paper, based on an evaluation conducted by the Independent Evaluation Group of the World Bank Group, examines how, and how well, the Bank uses feedback loops to enhance the poverty focus of its operations. Feedback loops are important for every element of the results chain running from data, to diagnostics, to strategy formulation and finally to strategy implementation. The evaluation uses a range of instruments, including surveys of stakeholders and World Bank staff, focus group meetings, country case studies and systematic reviews of Bank lending and non-lending operations. We find that while the Bank generates useful information on poverty reduction from its projects and programs, the feedback loops - from outcomes to data analysis to diagnostics to strategy formulation and implementation - have generally been weak, with sizable variation across countries. Copyright © 2017 The World Bank. Published by Elsevier Ltd.. All rights reserved.

  8. PReSaFe: A model of barriers and facilitators to patients providing feedback on experiences of safety.

    Science.gov (United States)

    De Brún, Aoife; Heavey, Emily; Waring, Justin; Dawson, Pamela; Scott, Jason

    2017-08-01

    The importance of involving patients in reporting on safety is increasingly recognized. Whilst studies have identified barriers to clinician incident reporting, few have explored barriers and facilitators to patient reporting of safety experiences. This paper explores patient perspectives on providing feedback on safety experiences. Patients (n=28) were invited to take part in semi-structured interviews when given a survey about their experiences of safety following hospital discharge. Transcripts were thematically analysed using NVivo10. Patients were recruited from four hospitals in the UK. Three themes were identified as barriers and facilitators to patient involvement in providing feedback on their safety experiences. The first, cognitive-cultural, found that whilst safety was a priority for most, some felt the term was not relevant to them because safety was the "default" position, and/or because safety could not be disentangled from the overall experience of care. The structural-procedural theme indicated that reporting was facilitated when patients saw the process as straightforward, but that disinclination or perceived inability to provide feedback was a barrier. Finally, learning and change illustrated that perception of the impact of feedback could facilitate or inhibit reporting. When collecting patient feedback on experiences of safety, it is important to consider what may help or hinder this process, beyond the process alone. We present a staged model of prerequisite barriers and facilitators and hypothesize that each stage needs to be achieved for patients to provide feedback on safety experiences. Implications for collecting meaningful data on patients' safety experiences are considered. © 2016 The Authors. Health Expectations Published by John Wiley & Sons Ltd.

  9. Operating wind turbines in strong wind conditions by using feedforward-feedback control

    International Nuclear Information System (INIS)

    Feng, Ju; Sheng, Wen Zhong

    2014-01-01

    Due to the increasing penetration of wind energy into power systems, it becomes critical to reduce the impact of wind energy on the stability and reliability of the overall power system. In precedent works, Shen and his co-workers developed a re-designed operation schema to run wind turbines in strong wind conditions based on optimization method and standard PI feedback control, which can prevent the typical shutdowns of wind turbines when reaching the cut-out wind speed. In this paper, a new control strategy combing the standard PI feedback control with feedforward controls using the optimization results is investigated for the operation of variable-speed pitch-regulated wind turbines in strong wind conditions. It is shown that the developed control strategy is capable of smoothening the power output of wind turbine and avoiding its sudden showdown at high wind speeds without worsening the loads on rotor and blades

  10. Current feedback operational amplifiers and their applications

    CERN Document Server

    Senani, Raj; Singh, A K; Singh, V K

    2013-01-01

    This book describes a variety of current feedback operational amplifier (CFOA) architectures and their applications in analog signal processing/generation. Coverage includes a comprehensive survey of commercially available, off-the-shelf integrated circuit CFOAs, as well as recent advances made on the design of CFOAs, including design innovations for bipolar and CMOS CFOAs.  This book serves as a single-source reference to the topic, as well as a catalog of over 200 application circuits which would be useful not only for students, educators and researchers in apprising them about the recent developments in the area but would also serve as a comprehensive repertoire of useful circuits for practicing engineers who might be interested in choosing an appropriate CFOA-based topology for use in a given application.

  11. Land-Atmosphere Feedback Experiment (LAFE) Science Plan

    Energy Technology Data Exchange (ETDEWEB)

    Wulfmeyer, Volker [University of Hohenheim; Turner, David [NOAA National Severe Storms Laboratory

    2016-07-01

    lower troposphere, including the interfacial layer of the CBL. The optimal azimuth is to the ENE of the SGP central facility, which takes advantage of both changes in the surface elevation and different crop types planted along that path. 3) The University of Wisconsin Space Science and Engineering Center Portable Atmospheric Research Center (SPARC) and the University of Oklahoma Collaborative Lower Atmospheric Mobile Profiling System (CLAMPS) operating two vertically pointing atmospheric emitted radiance interferometers (AERIs) and two Doppler lidar (DL) systems scanning cross track to the central RHI for determining the surface friction velocity and the horizontal variability of temperature, moisture, and wind. Thus, both the variability of surface fluxes and CBL dynamics and thermodynamics over the SGP site will be studied for the first time. The combination of these three components will enable us to estimate both the divergence of the latent heat profile and the advection of moisture. Thus, the moisture budget in the SGP domain can be studied. Furthermore, the simultaneous measurements of surface and entrainment fluxes as well as the daily cycle of the CBL thermodynamic state will provide a unique data set for characterizing LSA interaction in dependence of large-scale and local conditions such as soil moisture and the state of the vegetation. The measurements will also be applied for the development of improved parameterizations of surface fluxes and turbulence in the CBL. The latter is possible because mean profiles, gradients, higher-order moments, and fluxes are measured simultaneously. The results will be used for the verification of simulations of LSA feedback in large-eddy simulation (LES) and mesoscale models, which are planned for the SGP site. Due to the strong connection between the pre-convective state of the CBL and the formation of clouds and precipitation, this new generation of experiments will strongly contribute to the improvement of their

  12. Configuration control during plant outages. A review of operating experience

    Energy Technology Data Exchange (ETDEWEB)

    Peinador Veira, Miguel; El Kanbi, Semir [European Commission Joint Research Centre, Petten (Netherlands). Inst. for Energy and Transport; Stephan, Jean-Luc [Institut de Radioprotection et de Surete Nucleaire (IRSN), Fontenay-aux-Roses (France); Martens, Johannes [Gesellschaft fuer Anlagen- und Reaktorsicherheit (GRS) gGmbH, Koeln (Germany)

    2015-03-15

    After the occurrence of several significant events in nuclear power plants during shut-down modes of operation in the eighties, and from the results of probabilistic safety assessments completed in the nineties, it was clear that risk from low power and shutdown operational modes could not be neglected and had to be addressed by appropriate safety programs. A comprehensive review of operating experience from the last ten years has been conducted by the Joint Research Centre with the objective of deriving lessons learned and recommendations useful for nuclear regulatory bodies and utilities alike. This paper is focused on one particular challenge that any nuclear plant faces whenever it plans its next outage period: how to manage the configuration of all systems under a complex environment involving numerous concurrent activities, and how to make sure that systems are returned to their valid configuration before the plant resumes power operation. This study highlights the importance of conveying accurate but synthesized information on the status of the plant to the operators in the main control room. Many of the lessons learned are related to the alarm display in the control room and to the use of check lists to control the status of systems. Members of the industry and safety authorities may now use these recommendations and lessons learned to feed their own operating experience feedback programs, and check their applicability for specific sites.

  13. Active feedback control of kink modes in tokamaks: 3D VALEN modeling and HBT-EP experiments

    International Nuclear Information System (INIS)

    Maurer, D.A.

    2002-01-01

    Significant progress in the development of active feedback control as a robust technique for the suppression of the wall stabilized external kink or resistive wall mode (RWM) in tokamaks has been achieved through a combination of modeling and experiments. Results from the 3D feedback modeling code VALEN, which serves as the primary analysis and feedback control design tool for RWM studies on the HBT-EP and DIII-D experiments, are in good agreement with observations. VALEN modeling of proposed advanced control system designs on HBT-EP, DIII-D, NSTX, and FIRE are predicted to approach the ideal wall beta limit in agreement with design principles based on simple single mode analytic theory of RWM feedback control. Benchmark experiments on HBT-EP have shown suppression of plasma disruption at rational edge q values using active feedback control in agreement with model predictions. In addition, the observation in HBT-EP of the plasma amplification of static resonant magnetic fields in plasmas marginally stable to the RWM is in agreement with theory. (author)

  14. Feedback control and stabilization experiments on the Texas Experimental Tokamak (TEXT)

    International Nuclear Information System (INIS)

    Uckan, T.; Richards, B.; Wootton, A.J.; Bengtson, R.D.; Bravenec, R.; Carreras, B.A.; Li, G.X.; Hurwitz, P.; Phillips, P.E.; Rowan, W.L.; Tsui, H.Y.W.; Uglum, J.R.; Wen, Y.; Winslow, D.

    1995-01-01

    Plasma edge feedback experiments on the Texas Experimental Tokamak (TEXT) have been successful in controlling the edge plasma potential fluctuation level. The feedback wave-launcher is driven by the local edge potential fluctuations. The edge potential fluctuations are modified in a broad frequency band. Moreover, the potential fluctuations can be reduced (≤100 kHz) without enhancing other modes, or excited (10 to 12 kHz), depending on the phase difference between the driver and the launcher signal, and gain of the system. This turbulence modification is achieved not only locally but also halfway around the torus and has about 2 cm of poloidal extent. The local plasma parameters at the edge and the estimated fluctuation-induced radial particle flux are somewhat affected by the edge feedback. ((orig.))

  15. Design of EAST LHCD high power supply feedback control system based on PLC

    International Nuclear Information System (INIS)

    Hu Huaichuan; Shan Jiafang

    2009-01-01

    Design of EAST LHCD -35kV/5.6MW high power supply feedback control system based on PLC is described. Industrial computer and PLC are used to control high power supply in the system. PID arithmetic is adopted to achieve the feedback control of voltage of high power supply. Operating system is base on real-time operating system of QNX. Good controlling properties and reliable protective properties of the feedback control system are proved by the experiment results. (authors)

  16. A Current-Mode Common-Mode Feedback Circuit (CMFB) with Rail-to-Rail Operation

    Science.gov (United States)

    Suadet, Apirak; Kasemsuwan, Varakorn

    2011-03-01

    This paper presents a current-mode common-mode feedback (CMFB) circuit with rail-to-rail operation. The CMFB is a stand-alone circuit, which can be connected to any low voltage transconductor without changing or upsetting the existing circuit. The proposed CMFB employs current mirrors, operating as common-mode detector and current amplifier to enhance the loop gain of the CMFB. The circuit employs positive feedback to enhance the output impedance and gain. The circuit has been designed using a 0.18 μm CMOS technology under 1V supply and analyzed using HSPICE with BSIM3V3 device models. A pseudo-differential amplifier using two common sources and the proposed CMFB shows rail to rail output swing (± 0.7 V) with low common-mode gain (-36 dB) and power dissipation of 390 μW.

  17. CANDU operating experience

    International Nuclear Information System (INIS)

    McConnell, L.G.; Woodhead, L.W.; Fanjoy, G.R.; Thurygill, E.W.

    1980-05-01

    The CANDU-PHW program is based upon 38 years of heavy water reactor experience with 35 years of operating experience. Canada has had 72 reactor years of nuclear-electric operations experience with 10 nuclear units in 4 generating stations during a period of 18 years. All objectives have been met with outstanding performance: worker safety, public safety, environmental emissions, reliable electricity production, and low electricity cost. The achievement has been realized through total teamwork involving all scientific disciplines and all project functions (research, design, manufacturing, construction, and operation). (auth)

  18. Improving Hospital Services Based on Patient Experience Data: Current Feedback Practices and Future Opportunities.

    Science.gov (United States)

    Kaipio, Johanna; Stenhammar, Hanna; Immonen, Susanna; Litovuo, Lauri; Axelsson, Minja; Lantto, Minna; Lahdenne, Pekka

    2018-01-01

    Patient feedback is considered important for healthcare organizations. However, measurement and analysis of patient reported data is useful only if gathered insights are transformed into actions. This article focuses on gathering and utilization of patient experience data at hospitals with the aim of supporting the development of patient-centered services. The study was designed to explore both current practices of collecting and utilizing patient feedback at hospitals as well as future feedback-related opportunities. Nine people working at different hierarchical levels of three university hospitals in Finland participated in in-depth interviews. Findings indicate that current feedback processes are poorly planned and inflexible. Some feedback data are gathered, but not systematically utilized. Currently, it is difficult to obtain a comprehensive picture of the situation. One future hope was to increase the amount of patient feedback to be able to better generalize and utilize the data. Based on the findings the following recommendations are given: attention to both patients' and healthcare staff's perspectives when collecting feedback, employing a coordinated approach for collecting and utilizing patient feedback, and organizational transformation towards a patient-centric culture.

  19. Design of a Hardware-Implemented Phase Calculating System for Feedback Control in the LHCD Experiments on EAST

    International Nuclear Information System (INIS)

    Liu Qiang; Liang Hao; Zhou Yongzhao

    2009-01-01

    A fully hardware-implemented phase calculating system for the feedback control in the lower-hybrid current drive (LHCD) experiments is presented in this paper. By taking advantages of field programmable gate array (FPGA) chips with embedded digital signal processing (DSP) cores and the Matlab-aided design method, the phase calculating algorithm with a square root operation and parallel process are efficiently implemented in a single FPGA chip to complete the calculation of phase differences fast and accurately in the lower-hybrid wave (LHW) system on EAST. (fusion engineering)

  20. Operating Experience Report: Counterfeit, Suspect and Fraudulent Items. Working Group on Operating Experience. Proceedings and Analysis on an Item of Generic Interest

    International Nuclear Information System (INIS)

    2011-01-01

    The NEA Committee on Nuclear Regulatory Activities (CNRA) believes that sharing operating experience from the national operating experience feedback programmes are a major element in the industry's and regulatory body's efforts to ensure the continued safe operation of nuclear facilities. Considering the importance of these issues, the Committee on the Safety of Nuclear Installations (CSNI) established a working group, PWG no.1 (Principle Working Group Number 1) to assess operating experience in the late 1970's, which was later renamed the Working Group on Operating Experience (WGOE). In 1978, the CSNI approved the establishment of a system to collect international operating experience data. The accident at Three Mile Island shortly after added impetus to this and led to the start of the Incident Reporting System (IRS). In 1983, the IRS database was moved to the International Agency for Atomic Energy (IAEA) to be operated as a joint database by IAEA and NEA for the benefit of all of the member countries of both organisations. In 2006, the WGOE was moved to be under the umbrella of the Committee on Nuclear Regulatory Activities (CNRA) in NEA. In 2009, the scope of the Incident Reporting System was expanded and re-named the International Reporting System for Operating Experience (although, the acronym remains the same). The purpose of WGOE is to facilitate the exchange of information, experience, and lessons learnt related to operating experience between member countries. The working group continues its mission to identify trending and issues that should be addressed in specialty areas of CNRA and CSNI working groups. The CSFI (Counterfeit, Suspect, and Fraudulent Items) issue was determined to be the Issue of Generic Interest at the April 2010 WGOE meeting. The Issue of Generic Interest is determined by the working group members for an in-depth discussion. They are often emerging issues in operating experience that a country or several countries would to the share

  1. Experience in operation and maintenance of PWRs

    International Nuclear Information System (INIS)

    Broecker, H.; Schomer, E.

    1987-01-01

    At present there are 10 PWRs in operation, most of them built on turnkey basis by KWU. The availability of West German PWRs amounted to 84.7% on average for the period from 1982-86. The good operating results are attributable to the following: 1. Sophiticated design and layout of the plant with good accessibility to the primary system even during operation. 2. Reliable performance of plant and components as result of extensive quality assurance. 3. Well-organized and highly qualified operating personnel. 4. Inservice inspection and preventive maintenance. 5. Good information feedback system. (Liu)

  2. Interrater reliability of quantitative ultrasound using force feedback among examiners with varied levels of experience

    Directory of Open Access Journals (Sweden)

    Michael O. Harris-Love

    2016-06-01

    Full Text Available Background. Quantitative ultrasound measures are influenced by multiple external factors including examiner scanning force. Force feedback may foster the acquisition of reliable morphometry measures under a variety of scanning conditions. The purpose of this study was to determine the reliability of force-feedback image acquisition and morphometry over a range of examiner-generated forces using a muscle tissue-mimicking ultrasound phantom. Methods. Sixty material thickness measures were acquired from a muscle tissue mimicking phantom using B-mode ultrasound scanning by six examiners with varied experience levels (i.e., experienced, intermediate, and novice. Estimates of interrater reliability and measurement error with force feedback scanning were determined for the examiners. In addition, criterion-based reliability was determined using material deformation values across a range of examiner scanning forces (1–10 Newtons via automated and manually acquired image capture methods using force feedback. Results. All examiners demonstrated acceptable interrater reliability (intraclass correlation coefficient, ICC = .98, p .90, p < .001, independent of their level of experience. The measurement error among all examiners was 1.5%–2.9% across all applied stress conditions. Conclusion. Manual image capture with force feedback may aid the reliability of morphometry measures across a range of examiner scanning forces, and allow for consistent performance among examiners with differing levels of experience.

  3. Effects of feedback reliability on feedback-related brain activity: A feedback valuation account.

    Science.gov (United States)

    Ernst, Benjamin; Steinhauser, Marco

    2018-04-06

    Adaptive decision making relies on learning from feedback. Because feedback sometimes can be misleading, optimal learning requires that knowledge about the feedback's reliability be utilized to adjust feedback processing. Although previous research has shown that feedback reliability indeed influences feedback processing, the underlying mechanisms through which this is accomplished remain unclear. Here we propose that feedback processing is adjusted by the adaptive, top-down valuation of feedback. We assume that unreliable feedback is devalued relative to reliable feedback, thus reducing the reward prediction errors that underlie feedback-related brain activity and learning. A crucial prediction of this account is that the effects of feedback reliability are susceptible to contrast effects. That is, the effects of feedback reliability should be enhanced when both reliable and unreliable feedback are experienced within the same context, as compared to when only one level of feedback reliability is experienced. To evaluate this prediction, we measured the event-related potentials elicited by feedback in two experiments in which feedback reliability was varied either within or between blocks. We found that the fronto-central valence effect, a correlate of reward prediction errors during reinforcement learning, was reduced for unreliable feedback. But this result was obtained only when feedback reliability was varied within blocks, thus indicating a contrast effect. This suggests that the adaptive valuation of feedback is one mechanism underlying the effects of feedback reliability on feedback processing.

  4. Applying operating experience to design the CANDU 3 process

    International Nuclear Information System (INIS)

    Harris, D.S.; Hinchley, E.M.; Pauksens, J.; Snell, V.; Yu, S.K.W.

    1991-01-01

    The CANDU 3 is an advanced, smaller (450 MWe), standardized version of the CANDU now being designed for service later in the decade and beyond. The design of this evolutionary nuclear power plant has been carefully planned and organized to gain maximum benefits from new technologies and from world experience to date in designing, building, commissioning and operating nuclear power stations. The good performance record of existing CANDU reactors makes consideration of operating experience from these plants a particularly vital component of the design process. Since the completion of the first four CANDU 6 stations in the early 1980s, and with the continuing evolution of the multi-unit CANDU station designs since then, AECL CANDU has devised several processes to ensure that such feedback is made available to designers. An important step was made in 1986 when a task force was set up to review and process ideas arising from the commissioning and early operation of the CANDU 6 reactors which were, by that time, operating successfully in Argentina and Korea, as well as the Canadian provinces of Quebec and New Brunswick. The task force issued a comprehensive report which, although aimed at the design of an improved CANDU 6 station, was made available to the CANDU 3 team. By that time also, the Institute of Power Operations (INPO) in the U.S., of which AECL is a Supplier Participant member, was starting to publish Good Practices and Guidelines related to the review and the use of operating experiences. In addition, details of significant events were being made available via the INPO SEE-IN (Significant Event Evaluation and Information Network) Program, and subsequently the CANNET network of the CANDU Owners' Group (COG). Systematic review was thus possible by designers of operations reports, significant event reports, and related documents in a continuing program of design improvement. Another method of incorporating operations feedback is to involve experienced utility

  5. Applying operating experience to design the CANDU 3 process

    Energy Technology Data Exchange (ETDEWEB)

    Harris, D S; Hinchley, E M; Pauksens, J; Snell, V; Yu, S K.W. [AECL-CANDU, Ontario (Canada)

    1991-04-01

    The CANDU 3 is an advanced, smaller (450 MWe), standardized version of the CANDU now being designed for service later in the decade and beyond. The design of this evolutionary nuclear power plant has been carefully planned and organized to gain maximum benefits from new technologies and from world experience to date in designing, building, commissioning and operating nuclear power stations. The good performance record of existing CANDU reactors makes consideration of operating experience from these plants a particularly vital component of the design process. Since the completion of the first four CANDU 6 stations in the early 1980s, and with the continuing evolution of the multi-unit CANDU station designs since then, AECL CANDU has devised several processes to ensure that such feedback is made available to designers. An important step was made in 1986 when a task force was set up to review and process ideas arising from the commissioning and early operation of the CANDU 6 reactors which were, by that time, operating successfully in Argentina and Korea, as well as the Canadian provinces of Quebec and New Brunswick. The task force issued a comprehensive report which, although aimed at the design of an improved CANDU 6 station, was made available to the CANDU 3 team. By that time also, the Institute of Power Operations (INPO) in the U.S., of which AECL is a Supplier Participant member, was starting to publish Good Practices and Guidelines related to the review and the use of operating experiences. In addition, details of significant events were being made available via the INPO SEE-IN (Significant Event Evaluation and Information Network) Program, and subsequently the CANNET network of the CANDU Owners' Group (COG). Systematic review was thus possible by designers of operations reports, significant event reports, and related documents in a continuing program of design improvement. Another method of incorporating operations feedback is to involve experienced utility

  6. Investigating the Role of Auditory Feedback in a Multimodal Biking Experience

    DEFF Research Database (Denmark)

    Bruun-Pedersen, Jon Ram; Grani, Francesco; Serafin, Stefania

    2017-01-01

    In this paper, we investigate the role of auditory feedback in affecting perception of effort while biking in a virtual environment. Subjects were biking on a stationary chair bike, while exposed to 3D renditions of a recumbent bike inside a virtual environment (VE). The VE simulated a park...... and was created in the Unity5 engine. While biking, subjects were exposed to 9 kinds of auditory feedback (3 amplitude levels with three different filters) which were continuously triggered corresponding to pedal speed, representing the sound of the wheels and bike/chain mechanics. Subjects were asked to rate...... the perception of exertion using the Borg RPE scale. Results of the experiment showed that most subjects perceived a difference in mechanical resistance from the bike between conditions, but did not consciously notice the variations of the auditory feedback, although these were significantly varied. This points...

  7. The Tore Supra toroidal pump limiter: experience feedback of HHF elements series manufacture

    Energy Technology Data Exchange (ETDEWEB)

    Cordier, J.J.; Bayetti, P.; Chappuis, P.; Durocher, A.; Escourbiac, F.; Grosman, A.; Lipa, M.; Mitteau, R.; Schlosser, J.; Van Houtte, D

    2003-07-01

    Since 1992, reliable High Heat Flux PFCs based on copper alloy heat sink structures and a CFC armour, have been developed. The final result is an actively cooled high heat flux element that is capable of removing up to 10 MW.m{sup -2} in stationary operating conditions. About 600 of these high performance individual components have then been manufactured and assembled in order to equip a Toroidal Pump Limiter (TPL). The final deliveries was successfully achieved end of 2001. The paper deals with the experience feedback built-up along the four years duration of the TPL components manufacture. We will show where issues were encountered, how solutions were found to achieve the fabrication of components and will highlight what are the main technical lessons to be learned: acceptance criteria, choice of materials, margins of processes. Finally a proposal of an alternative optimised design is presented, fruit of the experience gained from this up to now, unique series manufacture of actively cooled plasma facing HHF components. We believe that such experience will certainly be of use to ITER as well as to Wendelstein 7-X as far as PFC is concerned. (authors)

  8. Moderator purification and design modifications based on operation feedback

    International Nuclear Information System (INIS)

    Das, S.; Chakrabarti, A.K.; Shirolkar, K.M.; Sharma, V.K.

    1994-01-01

    Heavy water is used as a moderator in the Pressurized Heavy Water Reactors using natural uranium as a fissile fuel. The purification system is provided to maintain the purity of moderator heavy water so as to minimise the radiolytic decomposition of heavy water due to nuclear radiation which otherwise would lead to hazardous concentration of deuterium in the moderator cover gas. The presence of dissolved impurity in the moderator increases the radiolysis rate by impeding the reverse reaction and hence these must be removed. The purification system in general controls the chemistry of moderator by minimizing the corrosion of piping in the circuit and along with the liquid poison injection system adjusts the concentration of the poisons in the moderator. This paper describes the evolution of the purification system for the 500 MWe PHWRs based on various operating requirements and feedback from the operating stations. (author)

  9. Experiment feedbacks in micromechanics modeling of thermomechanical behaviors of SMA polycrystals

    International Nuclear Information System (INIS)

    Sittner, P.; Novak, V.

    2004-01-01

    Simulations of pseudoelastic deformation of NiTi and CuAlZnMn polycrystals using an earlier developed micromechanics model are presented. Advantages of having multiple feedbacks established between the model and in situ neutron diffraction experiment as well as doing modeling and experimentation simultaneously are discussed

  10. Novel Reduced-Feedback Wireless Communication Systems

    KAUST Repository

    Shaqfeh, Mohammad Obaidah

    2011-11-20

    Modern communication systems apply channel-aware adaptive transmission techniques and dynamic resource allocation in order to exploit the peak conditions of the fading wireless links and to enable significant performance gains. However, conveying the channel state information among the users’ mobile terminals into the access points of the network consumes a significant portion of the scarce air-link resources and depletes the battery resources of the mobile terminals rapidly. Despite its evident drawbacks, the channel information feedback cannot be eliminated in modern wireless networks because blind communication technologies cannot support the ever-increasing transmission rates and high quality of experience demands of current ubiquitous services. Developing new transmission technologies with reduced-feedback requirements is sought. Network operators will benefit from releasing the bandwidth resources reserved for the feedback communications and the clients will enjoy the extended battery life of their mobile devices. The main technical challenge is to preserve the prospected transmission rates over the network despite decreasing the channel information feedback significantly. This is a noteworthy research theme especially that there is no mature theory for feedback communication in the existing literature despite the growing number of publications about the topic in the last few years. More research efforts are needed to characterize the trade-off between the achievable rate and the required channel information and to design new reduced-feedback schemes that can be flexibly controlled based on the operator preferences. Such schemes can be then introduced into the standardization bodies for consideration in next generation broadband systems. We have recently contributed to this field and published several journal and conference papers. We are the pioneers to propose a novel reduced-feedback opportunistic scheduling scheme that combines many desired features

  11. Operational experience review and methods to enhance safety and reliability in the NPP-Leibstadt (KKL)

    Energy Technology Data Exchange (ETDEWEB)

    Haeusermann, R [Kernkraftwerk Leibstadt AG, Leibstadt (Switzerland)

    1997-10-01

    In the nuclear community it became clear that an integrated feedback system of operating experience must also include the unsuccessful results. The deviations, expected to achieved performance are analysed to the failure mode and its effect. KKL has lowered the number of safety significant events since commercial operation started. The thoroughness of the review/analysis of the events has increased with high priority set to human factor induced events in operation and maintenance. Since the participation of the author in the ASSET-Mission in Smolensk in 1993, KKL introduced the ASSET-Root-Cause method and has supplemented it by the HPES (Human Performance Enhancement System). 4 refs, 6 figs.

  12. Operational experience review and methods to enhance safety and reliability in the NPP-Leibstadt (KKL)

    International Nuclear Information System (INIS)

    Haeusermann, R.

    1997-01-01

    In the nuclear community it became clear that an integrated feedback system of operating experience must also include the unsuccessful results. The deviations, expected to achieved performance are analysed to the failure mode and its effect. KKL has lowered the number of safety significant events since commercial operation started. The thoroughness of the review/analysis of the events has increased with high priority set to human factor induced events in operation and maintenance. Since the participation of the author in the ASSET-Mission in Smolensk in 1993, KKL introduced the ASSET-Root-Cause method and has supplemented it by the HPES (Human Performance Enhancement System). 4 refs, 6 figs

  13. Management of a radiological emergency. Experience feedback and post-accident management; Gestion d'une urgence radiologique. Retour d'experience et gestion post-accidentelle

    Energy Technology Data Exchange (ETDEWEB)

    Dubiau, Ph. [Institut de Radioprotection et de Surete Nucleaire (IRSN), 92 - Clamart (France)

    2007-07-15

    In France, the organization of crisis situations and the management of radiological emergency situations are regularly tested through simulation exercises for a continuous improvement. Past severe accidents represent experience feedback resources of prime importance which have led to deep changes in crisis organizations. However, the management of the post-accident phase is still the object of considerations and reflections between the public authorities and the intervening parties. This document presents, first, the nuclear crisis exercises organized in France, then, the experience feedback of past accidents and exercises, and finally, the main aspects to consider for the post-accident management of such events: 1 - Crisis exercises: objectives, types (local, national and international exercises), principles and progress, limits; 2 - Experience feedback: real crises (major accidents, other recent accidental situations or incidents), crisis exercises (experience feedback organization, improvements); 3 - post-accident management: environmental contamination and people exposure, management of contaminated territories, management of populations (additional protection, living conditions, medical-psychological follow up), indemnification, organization during the post-accident phase; 4 - conclusion and perspectives. (J.S.)

  14. Simulation and design of feedback control on resistive wall modes in Keda Torus eXperiment

    International Nuclear Information System (INIS)

    Li, Chenguang; Liu, Wandong; Li, Hong

    2014-01-01

    The feedback control of resistive wall modes (RWMs) in Keda Torus eXperiment (KTX) (Liu et al., Plasma Phys. Controlled Fusion 56, 094009 (2014)) is investigated by simulation. A linear model is built to describe the growth of the unstable modes in the absence of feedback and the resulting mode suppression due to feedback, given the typical reversed field pinch plasma equilibrium. The layout of KTX with two shell structures (the vacuum vessel and the stabilizing shell) is taken into account. The feedback performance is explored both in the scheme of “clean mode control” (Zanca et al., Nucl. Fusion 47, 1425 (2007)) and “raw mode control.” The discrete time control model with specific characteristic times will mimic the real feedback control action and lead to the favored control cycle. Moreover, the conceptual design of feedback control system is also presented, targeting on both RWMs and tearing modes

  15. Moderator purification and design modifications based on operation feedback

    Energy Technology Data Exchange (ETDEWEB)

    Das, S; Chakrabarti, A K; Shirolkar, K M; Sharma, V K [Nuclear Power Corporation, Bhabha Atomic Research Centre, Mumbai (India)

    1994-06-01

    Heavy water is used as a moderator in the Pressurized Heavy Water Reactors using natural uranium as a fissile fuel. The purification system is provided to maintain the purity of moderator heavy water so as to minimise the radiolytic decomposition of heavy water due to nuclear radiation which otherwise would lead to hazardous concentration of deuterium in the moderator cover gas. The presence of dissolved impurity in the moderator increases the radiolysis rate by impeding the reverse reaction and hence these must be removed. The purification system in general controls the chemistry of moderator by minimizing the corrosion of piping in the circuit and along with the liquid poison injection system adjusts the concentration of the poisons in the moderator. This paper describes the evolution of the purification system for the 500 MWe PHWRs based on various operating requirements and feedback from the operating stations. (author). 2 refs., 3 figs., 1 tab.

  16. Instructor feedback versus no instructor feedback on performance in a laparoscopic virtual reality simulator: a randomized educational trial.

    Science.gov (United States)

    Oestergaard, Jeanett; Bjerrum, Flemming; Maagaard, Mathilde; Winkel, Per; Larsen, Christian Rifbjerg; Ringsted, Charlotte; Gluud, Christian; Grantcharov, Teodor; Ottesen, Bent; Soerensen, Jette Led

    2012-02-28

    Several studies have found a positive effect on the learning curve as well as the improvement of basic psychomotor skills in the operating room after virtual reality training. Despite this, the majority of surgical and gynecological departments encounter hurdles when implementing this form of training. This is mainly due to lack of knowledge concerning the time and human resources needed to train novice surgeons to an adequate level. The purpose of this trial is to investigate the impact of instructor feedback regarding time, repetitions and self-perception when training complex operational tasks on a virtual reality simulator. The study population consists of medical students on their 4th to 6th year without prior laparoscopic experience. The study is conducted in a skills laboratory at a centralized university hospital. Based on a sample size estimation 98 participants will be randomized to an intervention group or a control group. Both groups have to achieve a predefined proficiency level when conducting a laparoscopic salpingectomy using a surgical virtual reality simulator. The intervention group receives standardized instructor feedback of 10 to 12 min a maximum of three times. The control group receives no instructor feedback. Both groups receive the automated feedback generated by the virtual reality simulator. The study follows the CONSORT Statement for randomized trials. Main outcome measures are time and repetitions to reach the predefined proficiency level on the simulator. We include focus on potential sex differences, computer gaming experience and self-perception. The findings will contribute to a better understanding of optimal training methods in surgical education. NCT01497782.

  17. Experience feedback from the transportation of Framatome fuel assemblies

    International Nuclear Information System (INIS)

    Robin, M.E.; Gaillard, G.; Aubin, C.

    1998-01-01

    Framatome, the foremost world nuclear fuel manufacturer, has for 25 years been delivering fuel elements from its three factories (Dessel, Romans, Pierrelatte) to the various sites in France and abroad (Germany, Sweden, Belgium, China, Korea, South Africa, Switzerland). During this period, Framatome has built up experience and expertise in fuel element transportation by road, rail and sea. In this filed, the range of constraints is very wide: safety and environmental protection constraints; constraints arising from the control and protection of nuclear materials, contractual and financial constraints, media watchdogs. Through the experience feedback from the transportation of FRAMATOME assemblies, this paper addresses all the phases in the transportation of fresh fuel assemblies. (authors)

  18. Feedback from dismantling operations (level 2) on EDF's first generation reactors

    International Nuclear Information System (INIS)

    West, J P.; Dionisio-Gomes, A.; Kus, J P.; Mervaux, P.; Bernet, P.; Dalmas, R.

    2003-01-01

    EDF's policy as regards the dismantling of the reactors that have ceased commercial operation, namely the eight power plants of the first generation and the Creys-Malville power plant, is explained. Generally speaking, prior to the year 2001, EDF had opted for the de-construction of these power plants to comply with a 'long wait' scenario, which consisted of waiting for a period of 5 to 10 years to achieve IAEA level 2 (partial release of the site), then postponing the total de-construction of the facilities for 25 to 50 years. Today, EDF has decided to undertake the total de-construction of these reactors, which have ceased commercial operation, over a period of 25 years. The purpose of this document is to present: - The reactors concerned, their background and their 'regulatory' situation, - The main operations performed and/or currently in progress, - The main elements of feedback from such operations, shedding light on the approach adopted in 2001. The installations concerned by the de-construction programme are as follows: - The 8 power plants of the first generation, which were built during the fifties and sixties and ceased commercial operation between 1973 and 1994, namely: Brennilis (industrial prototype using heavy water technology, jointly operated by EDF and CEA), the 6 power units of the NUGG type (natural uranium gas graphite) at Chinon, Saint-Laurent des Eaux and Bugey and the PWR reactor at Chooz A, - The storage silos at Saint-Laurent, where the sleeves for the fuel assemblies of reactors SLA1 and SLA2 are stored, corresponding to approximately 2000 tonnes of graphite, - The Creys-Malville reactor, FBR (fast breeder reactor) shut down in accordance with a government decision, which is currently undergoing decommissioning. At the current stage, our feedback from the dismantling operations carried out on nuclear facilities is based on (i) the work carried out or in progress that will make it possible to achieve the equivalent of IAEA level 2 in the

  19. Case study of feedbacks and synergisms in a double CO2 experiment

    International Nuclear Information System (INIS)

    Mitchell, C.S.; Potter, G.L.; Ellsaesser, H.W.; Walton, J.J.

    1981-01-01

    A method is described for analyzing the feedback and synergistic comtributions of temperature water vapor, cloud cover, surface albedo and CO 2 to the change in the radiation balance at the top of the atmosphere due to a perturbation in an annual-averaged zonal atmospheric climate model. The method is illustrated through analysis of a double CO 2 experiment with the Lawrence Livermore National Laboratory Statistical Dynamical Model (LLNL SDM). The method provides insight into the sensitivity of the model to feedback changes in individual parameters and how each parameter influences the effects of the others

  20. Dynamic Mesoscale Land-Atmosphere Feedbacks in Fragmented Forests in Amazonia

    Science.gov (United States)

    Rastogi, D.; Baidya Roy, S.

    2011-12-01

    This paper investigates land-atmosphere feedbacks in disturbed rainforests of Amazonia. Deforestation along the rapidly expanding highways and road network has created the unique fishbone land cover pattern in Rondonia, a state in southwestern Amazonia. Numerical experiments and observations show that sharp gradients in land cover due to the fishbone heterogeneity triggers mesoscale circulations. These circulations significantly change the spatial pattern of local hydrometeorology, especially convection, clouds and precipitation. The primary research question now is can these changes in local hydrometeorology affect vegetation growth in the clearings. If so, that would be a clear indication that land-atmosphere feedbacks can affect vegetation recovery in fragmented forests. A computationally-efficient modeling tool consisting of a mesoscale atmospheric model dynamically coupled with a plant growth model has been specifically developed to identify the atmospheric feedback pathways. Preliminary experiments focus on the seasonal-scale feedbacks during the dry season. Results show that temperature, incoming shortwave and precipitation are the three primary drivers through which the feedbacks operate. Increasing temperature increases respiratory losses generating a positive feedback. Increased cloud cover reduces incoming PAR and photosynthesis, resulting in a positive feedback. Increased precipitation reduces water stress and promotes growth resulting in a negative feedback. The net effect is a combination of these 3 feedback loops. These findings can significantly improve our understanding of ecosystem resiliency in disturbed tropical forests.

  1. Quality and safety in radiotherapy: precursor events and experience feedback;Qualite et securite en radiotherapie: evenements precurseurs et retour d'experience

    Energy Technology Data Exchange (ETDEWEB)

    Lartigau, E. [Centre de Lutte Contre le Cancer Oscar-Lambret, Dept. Universitaire de Radiotherapie, Lille-1 Univ., 59 - Lille (France)

    2009-12-15

    The safety in radiotherapy through a method using the experience feedback. It corresponds to a global process organised around a prospective and systematic statement of incidents occurring during the cure activity or around it. The events are registered, analyzed, treated by the committee of experience feedback in order to avoid their repetition and to eliminate the passage to accident. The analysis of the events enlightens the organisational dysfunction.Their correction and the communication following is an essential tool of management in the framework of the non-punishment, guarantee of confidence of personnel. (N.C.)

  2. Non destructive examinations and degradations: the use of feedback experience to improve maintenance policy

    International Nuclear Information System (INIS)

    Champigny, F.

    2007-01-01

    In France, since 1995, 58 pressurized water reactors have been operating to produce electricity. These reactors were built from 1975 to the beginning of nineties and are ranked in 4 standardized series, 900 MWe CP0 types, 900 MWe CPY types, 1300 MWe types and 1400 MWe types. The plants have undergone evolutions taking into account the feedback experience for manufacturing and construction, net power growth but also maintenance operations. In 1977 the first maintenance programs were based upon the American experience using ASME section XI code. As and when required, they have been modified with the events appeared during the operation. First of them concerned the steam generator tubes with the discover of the first primary water stress corrosion cracking at the end of the seventies then the under-clad cracking phenomenon in the 900 MWe pressure vessel nozzles. At the beginning of years 2000, the new departmental order dedicated to operation required to check and modify, if necessary, the maintenance policy to better take into account the possible damages, fast fracture studies for primary and secondary systems and, last but not least, qualification processes for non destructive examinations. These new requirements have induced a rewriting of the maintenance policies and inspection programs in the way to be more consistent with the need of an improved availability of the plants while keeping a high safety level. Through few examples, we show how the approaches and the practices have been modified in terms of non-destructive examination (NDE) and particularly the impact of the NDE qualification results. In addition, examples of the important choices between in-service inspection and repair policy are also described. (author)

  3. Efficient estimation of feedback effects with application to climate models

    International Nuclear Information System (INIS)

    Cacugi, D.G.; Hall, M.C.G.

    1984-01-01

    This work presents an efficient method for calculating the sensitivity of a mathematical model's result to feedback. Feedback is defined in terms of an operator acting on the model's dependent variables. The sensitivity to feedback is defined as a functional derivative, and a method is presented to evaluate this derivative using adjoint functions. Typically, this method allows the individual effect of many different feedbacks to be estimated with a total additional computing time comparable to only one recalculation. The effects on a CO 2 -doubling experiment of actually incorporating surface albedo and water vapor feedbacks in radiative-convective model are compared with sensivities calculated using adjoint functions. These sensitivities predict the actual effects of feedback with at least the correct sign and order of magnitude. It is anticipated that this method of estimation the effect of feedback will be useful for more complex models where extensive recalculations for each of a variety of different feedbacks is impractical

  4. Operation of the transverse feedback system at the CERN SPS

    International Nuclear Information System (INIS)

    Bossart, R.; Louwerse, R.; Mourier, J.; Vos, L.

    1987-01-01

    To prevent transverse instabilities at high beam intensity in the SPS, the transverse feedback system for damping the betatron oscillations has been upgraded for larger damping decrements and for increased system's bandwidth. The feedback loop now contains a digital delay line cancellor, so that the damper works with a velocity feedback Δx/Δt, unaffected by the closed orbit position x at the pick-up station. The digital processing of the feedback signal facilitates nonlinear feedback techniques such as antidamping and ''band-bang'' feedback. The ''bang-bang'' feedback provides the maximum possible damping rate of the injection oscillations in the SPS-collider, in order to minimize the emittance increase caused by filamentation. The antidamping nonlinearity provides small continuous beam oscillations of 50 μm amplitude for tracking the machine tune Q with a phase locked loop

  5. Feedback control of plasma density and heating power for steady state operation in LHD

    Energy Technology Data Exchange (ETDEWEB)

    Kamio, Shuji, E-mail: kamio@nifs.ac.jp; Kasahara, Hiroshi; Seki, Tetsuo; Saito, Kenji; Seki, Ryosuke; Nomura, Goro; Mutoh, Takashi

    2015-12-15

    Highlights: • We upgraded a control system for steady state operation in LHD. • This system contains gas fueling system and ICRF power control system. • Automatic power boost system is also attached for stable operation. • As a result, we achieved the long pulse up to 48 min in the electron density of more than 1 × 10{sup 19} m{sup −3}. - Abstract: For steady state operation, the feedback control of plasma density and heating power system was developed in the Large Helical Device (LHD). In order to achieve a record of the long pulse discharge, stable plasma density and heating power are needed. This system contains the radio frequency (RF) heating power control, interlocks, gas fueling, automatic RF phase control, ion cyclotron range of frequency (ICRF) antenna position control, and graphical user interface (GUI). Using the density control system, the electron density was controlled to the target density and using the RF heating power control system, the RF power injection could be stable. As a result of using this system, we achieved the long pulse up to 48 min in the electron density of more than 1 × 10{sup 19} m{sup −3}. Further, the ICRF hardware experienced no critical accidents during the 17th LHD experiment campaign in 2013.

  6. Receiving right/wrong feedback: consequences for learning.

    Science.gov (United States)

    Fazio, Lisa K; Huelser, Barbie J; Johnson, Aaron; Marsh, Elizabeth J

    2010-04-01

    Prior work suggests that receiving feedback that one's response was correct or incorrect (right/wrong feedback) does not help learners, as compared to not receiving any feedback at all (Pashler, Cepeda, Wixted, & Rohrer, 2005). In three experiments we examined the generality of this conclusion. Right/wrong feedback did not aid error correction, regardless of whether participants learned facts embedded in prose (Experiment 1) or translations of foreign vocabulary (Experiment 2). While right/wrong feedback did not improve the overall retention of correct answers (Experiments 1 and 2), it facilitated retention of low-confidence correct answers (Experiment 3). Reviewing the original materials was very useful to learners, but this benefit was similar after receiving either right/wrong feedback or no feedback (Experiments 1 and 2). Overall, right/wrong feedback conveys some information to the learner, but is not nearly as useful as being told the correct answer or having the chance to review the to-be-learned materials.

  7. Rapid Integration of Artificial Sensory Feedback during Operant Conditioning of Motor Cortex Neurons.

    Science.gov (United States)

    Prsa, Mario; Galiñanes, Gregorio L; Huber, Daniel

    2017-02-22

    Neuronal motor commands, whether generating real or neuroprosthetic movements, are shaped by ongoing sensory feedback from the displacement being produced. Here we asked if cortical stimulation could provide artificial feedback during operant conditioning of cortical neurons. Simultaneous two-photon imaging and real-time optogenetic stimulation were used to train mice to activate a single neuron in motor cortex (M1), while continuous feedback of its activity level was provided by proportionally stimulating somatosensory cortex. This artificial signal was necessary to rapidly learn to increase the conditioned activity, detect correct performance, and maintain the learned behavior. Population imaging in M1 revealed that learning-related activity changes are observed in the conditioned cell only, which highlights the functional potential of individual neurons in the neocortex. Our findings demonstrate the capacity of animals to use an artificially induced cortical channel in a behaviorally relevant way and reveal the remarkable speed and specificity at which this can occur. Copyright © 2017 The Authors. Published by Elsevier Inc. All rights reserved.

  8. Tap Arduino: An Arduino microcontroller for low-latency auditory feedback in sensorimotor synchronization experiments.

    Science.gov (United States)

    Schultz, Benjamin G; van Vugt, Floris T

    2016-12-01

    Timing abilities are often measured by having participants tap their finger along with a metronome and presenting tap-triggered auditory feedback. These experiments predominantly use electronic percussion pads combined with software (e.g., FTAP or Max/MSP) that records responses and delivers auditory feedback. However, these setups involve unknown latencies between tap onset and auditory feedback and can sometimes miss responses or record multiple, superfluous responses for a single tap. These issues may distort measurements of tapping performance or affect the performance of the individual. We present an alternative setup using an Arduino microcontroller that addresses these issues and delivers low-latency auditory feedback. We validated our setup by having participants (N = 6) tap on a force-sensitive resistor pad connected to the Arduino and on an electronic percussion pad with various levels of force and tempi. The Arduino delivered auditory feedback through a pulse-width modulation (PWM) pin connected to a headphone jack or a wave shield component. The Arduino's PWM (M = 0.6 ms, SD = 0.3) and wave shield (M = 2.6 ms, SD = 0.3) demonstrated significantly lower auditory feedback latencies than the percussion pad (M = 9.1 ms, SD = 2.0), FTAP (M = 14.6 ms, SD = 2.8), and Max/MSP (M = 15.8 ms, SD = 3.4). The PWM and wave shield latencies were also significantly less variable than those from FTAP and Max/MSP. The Arduino missed significantly fewer taps, and recorded fewer superfluous responses, than the percussion pad. The Arduino captured all responses, whereas at lower tapping forces, the percussion pad missed more taps. Regardless of tapping force, the Arduino outperformed the percussion pad. Overall, the Arduino is a high-precision, low-latency, portable, and affordable tool for auditory experiments.

  9. Simulator experiments: effects of NPP operator experience on performance

    International Nuclear Information System (INIS)

    Beare, A.N.; Gray, L.H.

    1985-01-01

    Experiments are being conducted on nuclear power plant (NPP) control room training simulators by the Oak Ridge National Laboratory, its subcontractor, General Physics Corporation, and participating utilities. The experiments are sponsored by the Nuclear Regulatory Commission's (NRC) Human Factors and Safeguards Branch, Division of Risk Analysis and Operations, and are a continuation of prior research using simulators, supported by field data collection, to provide a technical basis for NRC human factors regulatory issues concerned with the operational safety of nuclear power plants. During the FY83 research, a simulator experiment was conducted at the control room simulator for a GE boiling water reactor (BWR) NPP. The research subjects were licensed operators undergoing requalification training and shift technical advisors (STAs). This experiment was designed to investigate the effects of (a) senior reactor operator (SRO) experience, (b) operating crew augmentation with an STA and (c) practice, as a crew, upon crew and individual operator performance, in response to anticipated plant transients. The FY84 experiments are a partial replication and extension of the FY83 experiment, but with PWR operators and simulator. Methodology and results to date are reported

  10. Instructor feedback versus no instructor feedback on performance in a laparoscopic virtual reality simulator: a randomized educational trial

    Directory of Open Access Journals (Sweden)

    Oestergaard Jeanett

    2012-02-01

    Full Text Available Abstract Background Several studies have found a positive effect on the learning curve as well as the improvement of basic psychomotor skills in the operating room after virtual reality training. Despite this, the majority of surgical and gynecological departments encounter hurdles when implementing this form of training. This is mainly due to lack of knowledge concerning the time and human resources needed to train novice surgeons to an adequate level. The purpose of this trial is to investigate the impact of instructor feedback regarding time, repetitions and self-perception when training complex operational tasks on a virtual reality simulator. Methods/Design The study population consists of medical students on their 4th to 6th year without prior laparoscopic experience. The study is conducted in a skills laboratory at a centralized university hospital. Based on a sample size estimation 98 participants will be randomized to an intervention group or a control group. Both groups have to achieve a predefined proficiency level when conducting a laparoscopic salpingectomy using a surgical virtual reality simulator. The intervention group receives standardized instructor feedback of 10 to 12 min a maximum of three times. The control group receives no instructor feedback. Both groups receive the automated feedback generated by the virtual reality simulator. The study follows the CONSORT Statement for randomized trials. Main outcome measures are time and repetitions to reach the predefined proficiency level on the simulator. We include focus on potential sex differences, computer gaming experience and self-perception. Discussion The findings will contribute to a better understanding of optimal training methods in surgical education. Trial Registration NCT01497782

  11. Instructor feedback versus no instructor feedback on performance in a laparoscopic virtual reality simulator: a randomized educational trial

    Science.gov (United States)

    2012-01-01

    Abstract Background Several studies have found a positive effect on the learning curve as well as the improvement of basic psychomotor skills in the operating room after virtual reality training. Despite this, the majority of surgical and gynecological departments encounter hurdles when implementing this form of training. This is mainly due to lack of knowledge concerning the time and human resources needed to train novice surgeons to an adequate level. The purpose of this trial is to investigate the impact of instructor feedback regarding time, repetitions and self-perception when training complex operational tasks on a virtual reality simulator. Methods/Design The study population consists of medical students on their 4th to 6th year without prior laparoscopic experience. The study is conducted in a skills laboratory at a centralized university hospital. Based on a sample size estimation 98 participants will be randomized to an intervention group or a control group. Both groups have to achieve a predefined proficiency level when conducting a laparoscopic salpingectomy using a surgical virtual reality simulator. The intervention group receives standardized instructor feedback of 10 to 12 min a maximum of three times. The control group receives no instructor feedback. Both groups receive the automated feedback generated by the virtual reality simulator. The study follows the CONSORT Statement for randomized trials. Main outcome measures are time and repetitions to reach the predefined proficiency level on the simulator. We include focus on potential sex differences, computer gaming experience and self-perception. Discussion The findings will contribute to a better understanding of optimal training methods in surgical education. Trial Registration NCT01497782 PMID:22373062

  12. Operating experience feedback report: Assessment of spent fuel cooling. Volume 12

    International Nuclear Information System (INIS)

    Ibarra, J.G.; Jones, W.R.; Lanik, G.F.; Ornstein, H.L.; Pullani, S.V.

    1997-02-01

    This report documents the results of an independent assessment by a team from the Office of Analysis and Evaluation of Operational Data of spent-fuel-pool (SFP) cooling in operating nuclear power plants. The team assessed the likelihood and consequences of an extended loss of SFP cooling and suggested corrective actions, based on their findings

  13. Altered Sensory Feedbacks in Pianist's Dystonia: the altered auditory feedback paradigm and the glove effect

    Directory of Open Access Journals (Sweden)

    Felicia Pei-Hsin Cheng

    2013-12-01

    Full Text Available Background: This study investigates the effect of altered auditory feedback (AAF in musician's dystonia (MD and discusses whether altered auditory feedback can be considered as a sensory trick in MD. Furthermore, the effect of AAF is compared with altered tactile feedback, which can serve as a sensory trick in several other forms of focal dystonia. Methods: The method is based on scale analysis (Jabusch et al. 2004. Experiment 1 employs synchronization paradigm: 12 MD patients and 25 healthy pianists had to repeatedly play C-major scales in synchrony with a metronome on a MIDI-piano with 3 auditory feedback conditions: 1. normal feedback; 2. no feedback; 3. constant delayed feedback. Experiment 2 employs synchronization-continuation paradigm: 12 MD patients and 12 healthy pianists had to repeatedly play C-major scales in two phases: first in synchrony with a metronome, secondly continue the established tempo without the metronome. There are 4 experimental conditions, among them 3 are the same altered auditory feedback as in Experiment 1 and 1 is related to altered tactile sensory input. The coefficient of variation of inter-onset intervals of the key depressions was calculated to evaluate fine motor control. Results: In both experiments, the healthy controls and the patients behaved very similarly. There is no difference in the regularity of playing between the two groups under any condition, and neither did AAF nor did altered tactile feedback have a beneficial effect on patients’ fine motor control. Conclusions: The results of the two experiments suggest that in the context of our experimental designs, AAF and altered tactile feedback play a minor role in motor coordination in patients with musicians' dystonia. We propose that altered auditory and tactile feedback do not serve as effective sensory tricks and may not temporarily reduce the symptoms of patients suffering from MD in this experimental context.

  14. Midwifery students experience of teamwork projects involving mark-related peer feedback.

    Science.gov (United States)

    Hastie, Carolyn R; Fahy, Kathleen M; Parratt, Jenny A; Grace, Sandra

    2016-06-01

    Lack of teamwork skills among health care professionals endangers patients and enables workplace bullying. Individual teamwork skills are increasingly being assessed in the undergraduate health courses but rarely defined, made explicit or taught. To remedy these deficiencies we introduced a longitudinal educational strategy across all three years of the Bachelor of Midwifery program. To report on students' experiences of engaging in team based assignments which involved mark-related peer feedback. Stories of midwifery students' experiences were collected from 17 participants across the three years of the degree. These were transcribed and analysed thematically and interpreted using feminist collaborative conversations. Most participants reported being in well-functioning teams and enjoyed the experience; they spoke of 'we' and said 'Everyone was on Board'. Students in poorly functioning teams spoke of 'I' and 'they'. These students complained about the poor performance of others but they didn't speak up because they 'didn't want to make waves' and they didn't have the skills to be able to confidently manage conflict. All participants agreed 'Peer-related marks cause mayhem'. Teamwork skills should be specifically taught and assessed. These skills take time to develop. Students, therefore, should be engaged in a teamwork assignment in each semester of the entire program. Peer feedback should be moderated by the teacher and not directly related to marks. Crown Copyright © 2015. Published by Elsevier Ltd. All rights reserved.

  15. Can corrective feedback improve recognition memory?

    Science.gov (United States)

    Kantner, Justin; Lindsay, D Stephen

    2010-06-01

    An understanding of the effects of corrective feedback on recognition memory can inform both recognition theory and memory training programs, but few published studies have investigated the issue. Although the evidence to date suggests that feedback does not improve recognition accuracy, few studies have directly examined its effect on sensitivity, and fewer have created conditions that facilitate a feedback advantage by encouraging controlled processing at test. In Experiment 1, null effects of feedback were observed following both deep and shallow encoding of categorized study lists. In Experiment 2, feedback robustly influenced response bias by allowing participants to discern highly uneven base rates of old and new items, but sensitivity remained unaffected. In Experiment 3, a false-memory procedure, feedback failed to attenuate false recognition of critical lures. In Experiment 4, participants were unable to use feedback to learn a simple category rule separating old items from new items, despite the fact that feedback was of substantial benefit in a nearly identical categorization task. The recognition system, despite a documented ability to utilize controlled strategic or inferential decision-making processes, appears largely impenetrable to a benefit of corrective feedback.

  16. Auto-control experiments on DIDO using discontinuous feedback

    International Nuclear Information System (INIS)

    Lawrence, L.A.J.

    1959-12-01

    Experiments on auto-controlling the reactor DIDO are described and the equipment design discussed in some detail. The experiments are carried out to show the suitability of an on/off type of control for the maintenance of: (a) a constant flux level in the presence of noise. (b) constant period during power change. The controlling signals stem from measurement of neutron flux computed to give deviation from demanded power, and period respectively. These signals are fed to a D.C. amplifier with variable deadbang whose output is used to control relays, these in turn control the coarse control arms by means of three-phase motors. The system is designed on the basis of locus diagrams, a conventional non-linear technique being used to handle the relay performance. Calculation of the reactor transfer function at high and low power respectively shows that the stability margin is not appreciably affected by the inherent thermodynamic feedback in the reactor core. (author)

  17. Robust wide-range control of nuclear reactors by using the feedforward-feedback concept

    International Nuclear Information System (INIS)

    Weng, C.K.; Edwards, R.M.; Ray, A.

    1994-01-01

    A robust feedforward-feedback controller is proposed for wide-range operations of nuclear reactors. This control structure provides (a) optimized performance over a wide operating range resulting form the feedforward element and (b) guaranteed robust stability and performance resulting from the feedback element. The feedforward control law is synthesized via nonlinear programming, which generates an optimal control sequence over a finite-time horizon under specified constraints. The feedback control is synthesized via the structured singular value μ approach to guarantee robustness in the presence of disturbances and modeling uncertainties. The results of simulation experiments are presented to demonstrate efficacy of the proposed control structure for a large rapid power reduction to avoid unnecessary plant trips

  18. Recent U.S. reactor operating experience

    International Nuclear Information System (INIS)

    Stello, V. Jr.

    1977-01-01

    A qualitative assessment of U.S. and foreign reactor operating experience is provided. Recent operating occurrences having potentially significant safety impacts on power operation are described. An evaluation of the seriousness of each of these issues and the plans for resolution is discussed. A quantitative report on U.S. reactor operational experience is included. The details of the NRC program for evaluating and applying operating reactor experience in the regulatory process is discussed. A review is made of the adequacy of operating reactor safety and environmental margins based on actual operating experience. The Regulatory response philosophy to operating reactor experiences is detailed. This discussion indicates the NRC emphasis on the importance of a balanced action plan to provide for the protection of public safety in the national interest

  19. Can Social Comparison Feedback Affect Indicators of Eco-Friendly Travel Choices? Insights from Two Online Experiments

    Directory of Open Access Journals (Sweden)

    Rouven Doran

    2017-01-01

    Full Text Available Two online experiments explored the effects of social comparison feedback on indicators of eco-friendly travel choices. It was tested whether the chosen indicators are sensitive to the information conveyed, and if this varies as a function of in-group identification. Study 1 (N = 134 focused on unfavourable feedback (i.e., being told that one has a larger ecological footprint than the average member of a reference group. People who received unfavourable feedback reported stronger intentions to choose eco-friendly travel options than those who received nondiscrepant feedback, when in-group identification was high (not moderate or low. Perceived self- and collective efficacy were not associated with the feedback. Study 2 (N = 323 extended the focus on favourable feedback (i.e., being told that one has a smaller ecological footprint than the average member of a reference group. Neither unfavourable nor favourable feedback was associated with behavioural intentions, self- or collective efficacy. This means that Study 2 failed to replicate the finding of Study 1 that behavioural intentions were associated with unfavourable feedback, given that in-group identification is high. The findings are discussed in light of the existing literature. Suggestions are made for future studies investigating social comparison feedback as a means to motivate people to make eco-friendly travel choices.

  20. Evaluating Effectiveness of Modeling Motion System Feedback in the Enhanced Hess Structural Model of the Human Operator

    Science.gov (United States)

    Zaychik, Kirill; Cardullo, Frank; George, Gary; Kelly, Lon C.

    2009-01-01

    In order to use the Hess Structural Model to predict the need for certain cueing systems, George and Cardullo significantly expanded it by adding motion feedback to the model and incorporating models of the motion system dynamics, motion cueing algorithm and a vestibular system. This paper proposes a methodology to evaluate effectiveness of these innovations by performing a comparison analysis of the model performance with and without the expanded motion feedback. The proposed methodology is composed of two stages. The first stage involves fine-tuning parameters of the original Hess structural model in order to match the actual control behavior recorded during the experiments at NASA Visual Motion Simulator (VMS) facility. The parameter tuning procedure utilizes a new automated parameter identification technique, which was developed at the Man-Machine Systems Lab at SUNY Binghamton. In the second stage of the proposed methodology, an expanded motion feedback is added to the structural model. The resulting performance of the model is then compared to that of the original one. As proposed by Hess, metrics to evaluate the performance of the models include comparison against the crossover models standards imposed on the crossover frequency and phase margin of the overall man-machine system. Preliminary results indicate the advantage of having the model of the motion system and motion cueing incorporated into the model of the human operator. It is also demonstrated that the crossover frequency and the phase margin of the expanded model are well within the limits imposed by the crossover model.

  1. French experience of regulation and operation on reprocessing facilities of LWR spent fuels

    Energy Technology Data Exchange (ETDEWEB)

    Mercier, J P [DES/SESUL (France)

    1992-02-01

    This presentation describes the French experience of regulation and operation on reprocessing facilities: how the safety assessment was made of UP3-A plant of the La Hague establishment for the building permit and operating license within the context of French nuclear regulations and the national debate on the need for reprocessing. Other factors discussed are how the public was involved, how the regulations were improved in the process and what the different stages of commissioning consisted of. In the design studies of a reprocessing facility, three complementary approaches are used: - observance of regulations born of technical considerations, and good practice, - analysis of the hazards, using deterministic and probabilistic methods, within the framework of a safety report, - review of experience feedback from such a facility or like plants. The design of the facility must permit the prevention of accidents and limit their consequences. Moreover, during all foreseeable cases (normal operating, incidents and accidents), the safety of the staff, the public and the environment with regard to consequences of radioactive releases and ionising radiations must be ensured. In the evaluation of these consequences, the approach used is voluntarily pessimistic in order to take into account every possible case. It is based on the main following principles: definition of the events considered for the dimensioning of the facility; redundancy and diversification; defense in depth which consists of the multiplication of the barriers. The experience feedback comes, on the one hand from operator's findings aiming at improving its facility, on the other hand from incidents, the lessons of which being taken into account after careful analysis. These incidents are analyzed by the Safety Authority upon presentation of the data by the operator and on site findings of inspections. In other respects, the aim of inspections is to check that the plant and its operating practices are

  2. Nuclear units operating improvement by using operating experience

    International Nuclear Information System (INIS)

    Rotaru, I.; Bilegan, I.C.

    1997-01-01

    The paper presents how the information experience can be used to improve the operation of nuclear units. This areas include the following items: conservative decision making; supervisory oversight; teamwork; control room distraction; communications; expectations and standards; operator training and fundamental knowledge, procedure quality and adherence; plant status awareness. For each of these topics, the information illustrate which are the principles, the lessons learned from operating experience and the most appropriate exemplifying documents. (authors)

  3. Operational Performance of the Two-Channel 10 Megawatt Feedback Amplifier System for MHD Control on the Columbia University HBT-EP Tokamak

    International Nuclear Information System (INIS)

    Reass, W.A.; Wurden, G.A.

    1997-01-01

    The operational characteristics and performance of the two channel 10 Megawatt MHD feedback control system as installed by Los Alamos National Laboratory on the Columbia University HBT-EP tokamak are described. In the present configuration, driving independent 300 microH saddle coil sets, each channel can deliver 1100 Amperes and 16 kV peak to peak. Full power bandwidth is about 12 kHz, with capabilities at reduced power to 30 kHz. The present system topology is designed to suppress magnetohydrodynamic activity with m=2, n=1 symmetry. Application of either static (single phase) or rotating (twin phased) magnetic perturbations shows the ability to spin up or slow down the plasma, and also prevent (or cause) so-called ''mode-locking''. Open loop and active feedback experiments using a digital signal processor (DSP) have been performed on the HBT-EP tokamak and initial results show the ability to manipulate the plasma MHD mode frequency

  4. Operating experience feedback report: Technical specifications: Commercial power reactors

    International Nuclear Information System (INIS)

    O'Reilly, P.D.; Plumlee, G.L. III.

    1989-03-01

    This report documents a trends and patterns analysis of technical specification (TS)-related licensee event reports (LERs) conducted by the Nuclear Regulatory Commission's (NRC's) Office for Analysis and Evaluation of Operational Data (AEOD). The objectives of this analysis were (1) to identify and catalog technical specification-related LERs, (2) to categorize and evaluate the events reported in these a LERs, (3) to identify any issues arising from the evaluation which appear to have generic safety significance, or which relate to the on-going Technical Specification Improvement Program, and (4) to trend the results obtained from the analysis of the data obtained in (1) through (3). 9 refs., 9 figs., 22 tabs

  5. Operational-safety advantages of LMFBR's: the EBR-II experience and testing program

    International Nuclear Information System (INIS)

    Sackett, J.I.; Lindsay, R.W.; Golden, G.H.

    1982-01-01

    LMFBR's contain many inherent characteristics that simplify control and improve operating safety and reliability. The EBR-II design is such that good advantage was taken of these characteristics, resulting in a vary favorable operating history and allowing for a program of off-normal testing to further demonstrate the safe response of LMFBR's to upsets. The experience already gained, and that expected from the future testing program, will contribute to further development of design and safety criteria for LMFBR's. Inherently safe characteristics are emphasized and include natural convective flow for decay heat removal, minimal need for emergency power and a large negative reactivity feedback coefficient. These characteristics at EBR-II allow for ready application of computer diagnosis and control to demonstrate their effectiveness in response to simulated plant accidents. This latter testing objective is an important part in improvements in the man-machine interface

  6. Evaluating health services with point of service feedback: perspectives and experiences of patients, staff and community volunteers in an inpatient rehabilitation facility.

    Science.gov (United States)

    Gill, Stephen D; Dolley, Pamela J; Dunning, Trisha L; Hughes, Andrew J

    2015-01-01

    To determine patient, staff and community volunteer opinions and experiences of point of service feedback (POSF) in an inpatient rehabilitation facility. Participants were recruited by purposeful sampling. Two researchers conducted in-depth semi-scripted interviews with patients, staff or volunteers until no new issues emerged. Manually transcribed interview data underwent thematic analysis that grouped information into categories of related information. Twenty patients, 26 staff from 10 different professional groups, and 2 community volunteers were interviewed. Patient and volunteer data were grouped into five main categories: patients wanted their voice heard and acted on; patients could be positively and negatively affected by POSF; patients could be reluctant to evaluate staff; patients preferred POSF to post-discharge mailed questionnaires; and patients' feedback was influenced by the data collector. Staff wanted: feedback to help them improve the patient experience; and feedback that was trustworthy, usable and used. Staff believed that the feedback-collector influenced patients' feedback and affected how feedback could be used. Patients, staff and community volunteers identified issues that determine the appropriateness and usefulness of POSF. Policy and practise should address the preferences, needs and experiences of health service users and providers so that POSF produces maximum benefits for both patients and health services. Implications for Rehabilitation POSF can enhance patients' experiences of inpatient rehabilitation by providing a mechanism to be heard and communicating that patients are valued; care must be exercised with patients who find giving feedback stressful. Collecting POSF is most beneficial when coupled with methods to efficiently and effectively respond to feedback. POSF requires interpretation in light of its limitations including patients' ability to accurately and unreservedly communicate their experiences. Who collects POSF

  7. Effective corrective actions to enhance operational safety of nuclear installations

    International Nuclear Information System (INIS)

    2005-07-01

    The safe operation of nuclear power plants around the world and the prevention of incidents in these installations remain key concerns for the nuclear community. In this connection the feedback of operating experience plays a major role: every nuclear plant operator needs to have a system in place to identify and feed back the lessons learned from operating experience and to implement effective corrective actions to prevent safety events from reoccurring. An effective operating experience programme also includes a proactive approach that is aimed at preventing the first-time occurrence of safety events. In April 2003, the IAEA issued the PROSPER guidelines for nuclear installations to strengthen and enhance their own operating experience process and for self-assessment on the effectiveness of the feedback process. Subsequently, in the course of the Operational Safety Review Teams missions conducted by the IAEA that focused on the operational safety practices of nuclear power plants, the IAEA enhanced the review of the operating experience in nuclear power plants by implementing a new module that is derived from these guidelines. In order to highlight the effective implementation of the operating experience programme and to provide practical assistance in this area, the IAEA organized workshops and conferences to discuss recent trends in operating experience. The IAEA also performed assistance and review missions at plants and corporate organizations. The IAEA is further developing advice and assistance on operating experience feedback programmes and is reporting on good practices. The present publication is the outcome of two years of coordinated effort involving the participation of experts of nuclear organizations in several Member States. It provides information and good practices for successfully establishing an effective corrective actions programme. This publication forms part of a series that develops the principles set forth in these guidelines

  8. Operational experience of SST1 NBI control system with prototype Ion source

    International Nuclear Information System (INIS)

    Patel, V B; Patel, P J; Singh, N P; Tripathi, V; Thakkar, D; Gupta, L N; Prahlad, V; Sharma, S K; Bandyopadyay, M; Chakraborty, A K; Baruah, U K; Mattoo, S K; Patel, G B; Onali, Raja

    2010-01-01

    This paper presents operational experience of integrated control of the arc-filament and High-voltage power supply of Steady State Tokamak (SST)-1 NBI system using Versa Module Europa (VME) system on prototype Ion source. The control algorithm is implemented on the VxWorks operating system using 'C' language. This paper also describes the operating sequence and controls on power supply system. Discharge and Filament power supplies are controlled in such a way so that necessary discharge current can be available in Ion Source. The discharge current is controlled by manipulating the filament current. Close loop control is implemented on each filament power supply with feedback from Discharge Current to control the overall discharge inside the ion source. Necessary actions for shut OFF and subsequent Turn ON are also taken during breakdowns between the Grids of the ion source. Total numbers of breakdowns are also monitored. Shot is terminated, if the breakdown count is higher than the set value. This control system can be programmed to restart High-voltage power supply within 5mS after breakdown occurs. This control system is capable to handle the all types of dynamics in the system. This paper also presents results of experiment.

  9. Stability of longitudinal bunch length feedback for heavy-ion synchrotrons

    Directory of Open Access Journals (Sweden)

    D. Lens

    2013-03-01

    Full Text Available In heavy-ion synchrotrons such as the SIS18 at Helmholtzzentrum für Schwerionenforschung, Helmholtz Centre for Heavy Ion Research (GSI, coherent oscillations of the particle bunches are damped by rf feedback systems to increase the stability and to improve the beam quality. In the longitudinal direction, important modes are the coherent longitudinal dipole and quadrupole oscillation. In this paper we present a new and rigorous approach to analyze the longitudinal feedback to damp these modes. The results are applied to the rf feedback loop at GSI that damps the quadrupole mode. The stability analysis is compared with simulations and is in good agreement with results of a beam experiment. Finally, we summarize practical implications for the operation of the feedback system regarding performance and stability.

  10. Regulatory challenges in using nuclear operating experience

    International Nuclear Information System (INIS)

    2006-01-01

    There can be no doubt that the systematic evaluation of operating experience by the operator and the regulator is essential for continued safe operation of nuclear power plants. Recent concerns have been voiced that the operating experience information and insights are not being used effectively to promote safety. If these concerns foreshadow a real trend in OECD countries toward complacency in reporting and analysing operating events and taking corrective actions, then past experience suggests that similar or even more serious events will recur. This report discusses how the regulator can take actions to assure that operators have effective programmes to collect and analyse operating experience and, just as important, for taking steps to follow up with actions to prevent the events and conditions from recurring. These regulatory actions include special inspections of an operator operating experience programme and discussion with senior plant managers to emphasize the importance of having an effective operating experience programme. In addition to overseeing the operator programmes, the regulator has the broader responsibility for assuring that industry-wide trends, both national and international are monitored. To meet these responsibilities, the regulatory body must have its own operating experience programme, and this report discusses the important attributes of such regulatory programmes. It is especially important for the regulator to have the capability for assessing the full scope of operating experience issues, including those that may not be included in an operator operating experience programme, such as new research results, international operating experience, and broad industry trend information. (author)

  11. Simulator experiments: effects of NPP operator experience on performance

    International Nuclear Information System (INIS)

    Beare, A.N.; Gray, L.H.

    1984-01-01

    During the FY83 research, a simulator experiment was conducted at the control room simulator for a GE Boiling Water Reactor (BWR) NPP. The research subjects were licensed operators undergoing requalification training and shift technical advisors (STAs). This experiment was designed to investigate the effects of senior reactor operator (SRO) experience, operating crew augmentation with an STA and practice, as a crew, upon crew and individual operator performance, in response to anticipated plant transients. Sixteen two-man crews of licensed operators were employed in a 2 x 2 factorial design. The SROs leading the crews were split into high and low experience groups on the basis of their years of experience as an SRO. One half of the high- and low-SRO experience groups were assisted by an STA. The crews responded to four simulated plant casualties. A five-variable set of content-referenced performance measures was derived from task analyses of the procedurally correct responses to the four casualties. System parameters and control manipulations were recorded by the computer controlling the simulator. Data on communications and procedure use were obtained from analysis of videotapes of the exercises. Questionnaires were used to collect subject biographical information and data on subjective workload during each simulated casualty. For four of the five performance measures, no significant differences were found between groups led by high (25 to 114 months) and low (1 to 17 months as an SRO) experience SROs. However, crews led by low experience SROs tended to have significantly shorter task performance times than crews led by high experience SROs. The presence of the STA had no significant effect on overall team performance in responding to the four simulated casualties. The FY84 experiments are a partial replication and extension of the FY83 experiment, but with PWR operators and simulator

  12. Feedback control systems for non-linear simulation of operational transients in LMFBRs

    International Nuclear Information System (INIS)

    Khatib-Rahbar, M.; Agrawal, A.K.; Srinivasan, E.S.

    1979-01-01

    Feedback control systems for non-linear simulation of operational transients in LMFBRs are developed. The models include (1) the reactor power control and rod drive mechanism, (2) sodium flow control and pump drive system, (3) steam generator flow control and valve actuator dynamics, and (4) the supervisory control. These models have been incorporated into the SSC code using a flexible approach, in order to accommodate some design dependent variations. The impact of system nonlinearity on the control dynamics is shown to be significant for severe perturbations. Representative result for a 10 cent and 25 cent step insertion of reactivity and a 10% ramp change in load in 40 seconds demonstrate the suitability of this model for study of operational transients without scram in LMFBRs

  13. Ambulatory Feedback System

    Science.gov (United States)

    Finger, Herbert; Weeks, Bill

    1985-01-01

    This presentation discusses instrumentation that will be used for a specific event, which we hope will carry on to future events within the Space Shuttle program. The experiment is the Autogenic Feedback Training Experiment (AFTE) scheduled for Spacelab 3, currently scheduled to be launched in November, 1984. The objectives of the AFTE are to determine the effectiveness of autogenic feedback in preventing or reducing space adaptation syndrome (SAS), to monitor and record in-flight data from the crew, to determine if prediction criteria for SAS can be established, and, finally, to develop an ambulatory instrument package to mount the crew throughout the mission. The purpose of the Ambulatory Feedback System (AFS) is to record the responses of the subject during a provocative event in space and provide a real-time feedback display to reinforce the training.

  14. Exploring Occupational Therapy Students' Meaning of Feedback during Fieldwork Experiences

    Science.gov (United States)

    Rathgeber, Karen Lynne

    2014-01-01

    Researchers have revealed that students' confidence and performance improve after they receive feedback from clinical supervisors regarding the delivery of quality patient care. Multiple studies of feedback have focused on the provision and acceptance of feedback; however, it was not known if or how students internalized feedback to promote…

  15. Perceiving haptic feedback in virtual reality simulators.

    Science.gov (United States)

    Våpenstad, Cecilie; Hofstad, Erlend Fagertun; Langø, Thomas; Mårvik, Ronald; Chmarra, Magdalena Karolina

    2013-07-01

    To improve patient safety, training of psychomotor laparoscopic skills is often done on virtual reality (VR) simulators outside the operating room. Haptic sensations have been found to influence psychomotor performance in laparoscopy. The emulation of haptic feedback is thus an important aspect of VR simulation. Some VR simulators try to simulate these sensations with handles equipped with haptic feedback. We conducted a survey on how laparoscopic surgeons perceive handles with and without haptic feedback. Surgeons with different levels of experience in laparoscopy were asked to test two handles: Xitact IHP with haptic feedback and Xitact ITP without haptic feedback (Mentice AB, Gothenburg, Sweden), connected to the LapSim (Surgical Science AB, Sweden) VR simulator. They performed two tasks on the simulator before answering 12 questions regarding the two handles. The surgeons were not informed about the differences in the handles. A total of 85 % of the 20 surgeons who participated in the survey claimed that it is important that handles with haptic feedback feel realistic. Ninety percent of the surgeons preferred the handles without haptic feedback. The friction in the handles with haptic feedback was perceived to be as in reality (5 %) or too high (95 %). Regarding the handles without haptic feedback, the friction was perceived as in reality (45 %), too low (50 %), or too high (5 %). A total of 85 % of the surgeons thought that the handle with haptic feedback attempts to simulate the resistance offered by tissue to deformation. Ten percent thought that the handle succeeds in doing so. The surveyed surgeons believe that haptic feedback is an important feature on VR simulators; however, they preferred the handles without haptic feedback because they perceived the handles with haptic feedback to add additional friction, making them unrealistic and not mechanically transparent.

  16. Reliability in mechanics: the application of experience feedback

    International Nuclear Information System (INIS)

    Coudray, R.

    1994-01-01

    After a short overview of the available methods for statistical multi-dimensional studies, an application of these methods is described using the experience feedback of French nuclear reactors. The material studied is the RCV (chemical and volumetric control system) pump of the 900 MW PWR type reactors for which data used in the study are explained. The aim of the study is to show the pertinency of the rate of failures as an indicator of the material aging. This aging is illustrated by the most significant characteristics with an indication of their significance level. The method used combines the results from a mixed classification and those from a multiple correspondences analysis in several steps or evolutions. (J.S.). 8 refs., 6 figs., 3 tabs

  17. Effect of biased feedback on motor imagery learning in BCI-teleoperation system

    Directory of Open Access Journals (Sweden)

    Maryam eAlimardani

    2014-04-01

    Full Text Available Feedback design is an important issue in motor imagery BCI systems. Regardless, to date it has not been reported how feedback presentation can optimize co-adaptation between a human brain and such systems. This paper assesses the effect of realistic visual feedback on users’ BC performance and motor imagery skills. We previously developed a tele-operation system for a pair of humanlike robotic hands and showed that BCI control of such hands along with first-person perspective visual feedback of movements can arouse a sense of embodiment in the operators. In the first stage of this study, we found that the intensity of this ownership illusion was associated with feedback presentation and subjects’ performance during BCI motion control. In the second stage, we probed the effect of positive and negative feedback bias on subjects’ BCI performance and motor imagery skills. Although the subject specific classifier, which was set up at the beginning of experiment, detected no significant change in the subjects’ online performance, evaluation of brain activity patterns revealed that subjects’ self-regulation of motor imagery features improved due to a positive bias of feedback and a possible occurrence of ownership illusion. Our findings suggest that in general training protocols for BCIs, manipulation of feedback can play an important role in the optimization of subjects’ motor imagery skills.

  18. GIVING AND RECEIVING CONSTRUCTIVE FEEDBACK

    Directory of Open Access Journals (Sweden)

    Ірина Олійник

    2015-05-01

    Full Text Available The article scrutinizes the notion of feedback applicable in classrooms where team teaching is provided. The experience of giving and receiving feedback has been a good practice in cooperation between a U.S. Peace Corps volunteer and a Ukrainian counterpart. Giving and receiving feedback is an effective means of classroom observation that provides better insight into the process of teaching a foreign language. The article discusses the stages of feedback and explicates the notion of sharing experience between two teachers working simultaneously in the same classroom. The guidelines for giving and receiving feedback have been provided as well as the most commonly used vocabulary items have been listed. It has been proved that mutual feedback leads to improving teaching methods and using various teaching styles and techniques.

  19. A Dataset of Three Educational Technology Experiments on Differentiation, Formative Testing and Feedback

    Science.gov (United States)

    Haelermans, Carla; Ghysels, Joris; Prince, Fernao

    2015-01-01

    This paper describes a dataset with data from three individually randomized educational technology experiments on differentiation, formative testing and feedback during one school year for a group of 8th grade students in the Netherlands, using administrative data and the online motivation questionnaire of Boekaerts. The dataset consists of pre-…

  20. Operational feedback on internal structure vibration in 54 French PWRs during 300 fuel cycles

    International Nuclear Information System (INIS)

    Trenty, A.

    1995-01-01

    EDF has acquired extensive feedback on vibration of reactor vessel internals by analysing ex-core neutron noise on its 54 pressurized water reactors during the course of over 300 fuel cycles. This feedback has been built up by processing more than 3,000 vibratory signatures acquired since the startup of its reactors. These signatures are now centralized for the whole of France in the ''SINBAD'' data base. Signature processing has enabled: distinguishing between mechanical phenomena and signature variation linked to unit operation: in particular, the impact on signature level of unit operating parameters such as initial fuel enrichment and burn-up rate was assessed; among the purely mechanical phenomena, pointing up slight changes in position of vessel internals and the first signs of structural wear; relaxation (in the hold-down spring and fuel rod assemblies) and wear on surfaces of contact between internals and reactor vessel were detected; lastly and most importantly, automatic recognition of the various types of vibratory behavior of internals. It was consequently possible to draw up user requirement specifications for automated monitoring of internals, which should soon be integrated in PSAD, a system which groups several reactor monitoring functions. (author)

  1. A new visual feedback-based magnetorheological haptic master for robot-assisted minimally invasive surgery

    Science.gov (United States)

    Choi, Seung-Hyun; Kim, Soomin; Kim, Pyunghwa; Park, Jinhyuk; Choi, Seung-Bok

    2015-06-01

    In this study, we developed a novel four-degrees-of-freedom haptic master using controllable magnetorheological (MR) fluid. We also integrated the haptic master with a vision device with image processing for robot-assisted minimally invasive surgery (RMIS). The proposed master can be used in RMIS as a haptic interface to provide the surgeon with a sense of touch by using both kinetic and kinesthetic information. The slave robot, which is manipulated with a proportional-integrative-derivative controller, uses a force sensor to obtain the desired forces from tissue contact, and these desired repulsive forces are then embodied through the MR haptic master. To verify the effectiveness of the haptic master, the desired force and actual force are compared in the time domain. In addition, a visual feedback system is implemented in the RMIS experiment to distinguish between the tumor and organ more clearly and provide better visibility to the operator. The hue-saturation-value color space is adopted for the image processing since it is often more intuitive than other color spaces. The image processing and haptic feedback are realized on surgery performance. In this work, tumor-cutting experiments are conducted under four different operating conditions: haptic feedback on, haptic feedback off, image processing on, and image processing off. The experimental realization shows that the performance index, which is a function of pixels, is different in the four operating conditions.

  2. Comparison between gas puffing and supersonic molecular beam injection in plasma density feedback experiments in EAST

    International Nuclear Information System (INIS)

    Zheng, Xingwei; Li, Jiangang; Hu, Jiansheng; Li, Jiahong; Ding, Rui; Cao, Bin; Wu, Jinhua

    2013-01-01

    To achieve desirable plasma density control, a supersonic molecular beam injection (SMBI) feedback control system has been developed recently for the EAST tokamak. The performance of the SMBI and gas puffing (GP) feedback systems were used and compared. The performance of pulse width mode is better than that of pulse amplitude mode when GP was used for density feedback control. During one-day experiments, the variation of gas input and wall retention can be clarified into two stages. In the first stage the retention ratio is as high as 80–90%, and the gas input is about an order of 10 22 D 2 . However, in the second stage, the retention ratio is at a range of 50–70%. The gas input of a single discharge is small and the net wall retention grows slowly. The results of the SMBI feedback control experiment was analyzed. The shorter delay time of SMBI makes it faster at feeding back control the plasma density. The result showed that, compared with GP, the gas input of SMBI was decreased ∼30% and the wall retention was reduced ∼40%. This shows SMBI's advantage for the long pulse high density discharges in EAST. (paper)

  3. High-Feedback Operation of Power Electronic Converters

    Directory of Open Access Journals (Sweden)

    Gennady Y. Mikhal'chenko

    2013-03-01

    Full Text Available The purpose of this review is to provide a survey of some of the most important bifurcation phenomena that one can observe in pulse-modulated converter systems when operating with high corrector gain factors. Like other systems with switching control, electronic converter systems belong to the class of piecewise-smooth dynamical systems. A characteristic feature of such systems is that the trajectory is “sewed” together from subsequent discrete parts. Moreover, the transitions between different modes of operation in response to a parameter variation are often qualitatively different from the bifurcations we know for smooth systems. The review starts with an introduction to the concept of border-collision bifurcations and also demonstrates the approach by which the full dynamics of the piecewise-linear, time-continuous system can be reduced to the dynamics of a piecewise-smooth map. We describe the main bifurcation structures that one observes in three different types of converter systems: (1 a DC/DC converter; (2 a multi-level DC/DC converter; and (3 a DC/AC converter. Our focus will be on the bifurcations by which the regular switching dynamics becomes unstable and is replaced by ergodic or resonant periodic dynamics on the surface of a two-dimensional torus. This transition occurs when the feedback gain is increased beyond a certain threshold, for instance in Electronics 2013, 2 114 order to improve the speed and accuracy of the output voltage regulation. For each of the three converter types, we discuss a number of additional bifurcation phenomena, including the formation and reconstruction of multi-layered tori and the appearance of phase-synchronized quasiperiodicity. Our numerical simulations are compared with experimentally observed waveforms.

  4. Sea ice-albedo climate feedback mechanism

    Energy Technology Data Exchange (ETDEWEB)

    Schramm, J.L.; Curry, J.A. [Univ. of Colorado, Boulder, CO (United States); Ebert, E.E. [Bureau of Meterology Research Center, Melbourne (Australia)

    1995-02-01

    The sea ice-albedo feedback mechanism over the Arctic Ocean multiyear sea ice is investigated by conducting a series of experiments using several one-dimensional models of the coupled sea ice-atmosphere system. In its simplest form, ice-albedo feedback is thought to be associated with a decrease in the areal cover of snow and ice and a corresponding increase in the surface temperature, further decreasing the area cover of snow and ice. It is shown that the sea ice-albedo feedback can operate even in multiyear pack ice, without the disappearance of this ice, associated with internal processes occurring within the multiyear ice pack (e.g., duration of the snow cover, ice thickness, ice distribution, lead fraction, and melt pond characteristics). The strength of the ice-albedo feedback mechanism is compared for several different thermodynamic sea ice models: a new model that includes ice thickness distribution., the Ebert and Curry model, the Mayjut and Untersteiner model, and the Semtner level-3 and level-0 models. The climate forcing is chosen to be a perturbation of the surface heat flux, and cloud and water vapor feedbacks are inoperative so that the effects of the sea ice-albedo feedback mechanism can be isolated. The inclusion of melt ponds significantly strengthens the ice-albedo feedback, while the ice thickness distribution decreases the strength of the modeled sea ice-albedo feedback. It is emphasized that accurately modeling present-day sea ice thickness is not adequate for a sea ice parameterization; the correct physical processes must be included so that the sea ice parameterization yields correct sensitivities to external forcing. 22 refs., 6 figs., 1 tab.

  5. Fast feedback for linear colliders

    International Nuclear Information System (INIS)

    Hendrickson, L.; Adolphsen, C.; Allison, S.; Gromme, T.; Grossberg, P.; Himel, T.; Krauter, K.; MacKenzie, R.; Minty, M.; Sass, R.

    1995-01-01

    A fast feedback system provides beam stabilization for the SLC. As the SLC is in some sense a prototype for future linear colliders, this system may be a prototype for future feedbacks. The SLC provides a good base of experience for feedback requirements and capabilities as well as a testing ground for performance characteristics. The feedback system controls a wide variety of machine parameters throughout the SLC and associated experiments, including regulation of beam position, angle, energy, intensity and timing parameters. The design and applications of the system are described, in addition to results of recent performance studies

  6. CANDU operating experience

    International Nuclear Information System (INIS)

    McConnell, L.G.; Woodhead, L.W.; Fanjoy, G.R.

    1982-03-01

    The CANDU Pressurized Heavy Water (CANDU-PHW) type of nuclear electric generating station has been developed jointly by Atomic Energy of Canada Limited and Ontario Hydro. This paper highlights Ontario Hydro's operating experience using the CANDU-PHW system, with a focus on the operating performance and costs, reliability of system components and nuclear safety considerations both to the workers and the public

  7. First insights from common GRS and IRSN evaluations of operational experiences for the European Clearinghouse

    International Nuclear Information System (INIS)

    Maqua, M.; Bertrand, R.

    2012-01-01

    The European Clearinghouse on Operating Experience Feedback (OEF) for NPPs was established in 2008 by several European Nuclear Safety Regulators. The technical work on common operational experience evaluation was launched at the Joint Research Center of the European Union. Main goals of the European Clearinghouse include promotion of collaboration on OEF, dissemination of the lessons learnt from NPP operational experience and promoting advanced event assessment approaches and methods. The extended knowledge of both IRSN and GRS in the evaluation of the national operating experiences in France and Germany, respectively, is used by the European Clearinghouse with the objective of receiving detailed insights on safety related topics. IRSN and GRS develop common reports on safety issues upon request of the Clearinghouse that involve a detailed review of their national event databases, and that are combined afterwards in a European Clearinghouse report including also the review carried out by the JRC on the basis of the Incident Report System (IRS) database and the US NRC Licensee Event Reports (LERs) database. The aim is to perform in-depth analyses (causes, root causes, contributing factors, actual and potential consequences, and lessons learnt) of specific OEF topics. 3 topics have been already analyzed: -) external events (Serious accidents caused by external hazards were not found in the German and French operating experience), -) ageing of components (it can be concluded that ageing management in French and German NPP is basically effective), and -) component supply (the main cause for events related to the supply of components was insufficiency during manufacturing or testing). This paper is followed by the slides of the presentation

  8. Instructor feedback versus no instructor feedback on performance in a laparoscopic virtual reality simulator

    DEFF Research Database (Denmark)

    Strandbygaard, Jeanett; Bjerrum, Flemming; Maagaard, Mathilde

    2013-01-01

    % vs 49%; P = 0.004). Men used less time (in minutes) than women (P = 0.037), but no sex difference was observed for repetitions (P = 0.20). Participants in the intervention group had higher self-perception regarding surgical skills after the trial (P = 0.011). CONCLUSIONS:: Instructor feedback...... increases the efficiency when training a complex operational task on a virtual reality simulator; time and repetitions used to achieve a predefined proficiency level were significantly reduced in the group that received instructor feedback compared with the control group. Trial registration number: NCT......OBJECTIVE:: To investigate the impact of instructor feedback versus no instructor feedback when training a complex operational task on a laparoscopic virtual reality simulator. BACKGROUND:: Simulators are now widely accepted as a training tool, but there is insufficient knowledge about how much...

  9. Industry Operating Experience Process at Krsko NPP

    International Nuclear Information System (INIS)

    Bach, B.; Bozin, B.; Cizmek, R.

    2012-01-01

    Experience has shown that number of minor events and near misses, usually without immediate or significant impact to plant safety and reliability, are precursors of significant or severe events due to the same or similar root or apparent cause(s). It is therefore desirable to identify and analyze weaknesses of the precursor problems (events) in order to prevent occurrence of significant events. Theoretically, significant events could be prevented from occurring if the root cause(s) of these precursor problems could be identified and eliminated. The Operating Experience Program identifies such event precursors and by reporting them to the industry, plant specific corrective actions can be taken to prevent events at other operational plants. The intent of the Operating Experience Program is therefore to improve nuclear power plant safety and reliability of the operating nuclear power plants. Each plant develops its own Operating Experience Program in order to learn from the in-house operating experience as well as from the world community of nuclear plants. The effective use of operating experience includes analyzing both plant and industry events in order to identify fundamental weaknesses and then determining appropriate plant-specific actions that will minimize the likelihood of similar events. Learning and applying the lessons from operating experience is an integral part of station safety culture and is encouraged by managers throughout the top plant administrative programs and procedures. Krsko NPP is developed it own Operating Experience Program by using the most relevant INPO/WANO/IAEA guidelines as well as its own knowledge, skills an operating practice. The Operating Experience Program is a part of the Corrective Action Program, which is among top management programs, thus program is strongly encouraged by top management. The purpose of Operating Experience Program is to provide guidance for using, sharing, and evaluating operating experience information

  10. Feedback characteristics between implantable microphone and transducer in middle ear cavity.

    Science.gov (United States)

    Arman Woo, S H; Woo, Seong Tak; Song, Byung Seop; Cho, Jin-Ho

    2013-10-01

    With the advent of implantable hearing aids, implementation and acoustic sensing strategy of the implantable microphone becomes an important issue; among the many types of implantable microphone, placing the microphone in middle ear cavity (MEC) has advantages including simple operation and insensitive to skin touching or chewing motion. In this paper, an implantable microphone was implemented and researched feedback characteristic when both the implantable microphone and the transducer were placed in the MEC. Analytical and finite element analysis were conducted to design the microphone to have a natural frequency of 7 kHz and showed good characteristics of SNR and sensitivity. For the feedback test, simple analytical and finite element analysis were calculated and compared with in vitro experiments (n = 4). From the experiments, the open-loop gain and feedback factor were measured and the minimum gain margin measured as 14.3 dB.

  11. Kick-off research coordination meeting of the IAEA coordinated research project on analyses of, and lessons learned from the operational experience with fast reactor equipment and systems. Working material

    International Nuclear Information System (INIS)

    2007-01-01

    The specific objectives of the IAEA Coordinated Research Project (CRP) on Analyses of, and Lessons Learned from the Operational Experience with Fast Reactor Equipment and Systems are to - Preserve the feedback from commissioning, operation, and decommissioning experience of experimental and power sodium cooled fast reactors; - Enable easy access to the information from this feedback; - Produce lessons-learned/synthesis reports from the commissioning, operation, and decommissioning of experimental and power sodium cooled fast reactors. To achieve these objectives, the CRP participants will retrieve, assess and archive all the documentation and information relevant to feedback from commissioning, operation, and decommissioning of sodium cooled fast reactors. The archiving step may include conversion of the documents in electronic form and the preparation of electronic databases organized along scientific/technical topics and reactors. Then, the CRP will work on the critical review, assessment, and systematization of the available data, and will publish synthesis reports, including the appropriate recommendations from the 'lessons learned'. It is important to stress that these generalization efforts are crucial in view of the generational change occurring now: preserving the knowledge and experience of the generation who participated in the initial development work of sodium cooled fast reactors and is now retiring, and ultimately ensuring the systematic use of the operational feedback in the form of a 'lessons learned' approach, is essential since it was in the early stage of the studies that the key decisions and design choices were made. To accomplish the lessons-learned and synthesising work requires for as many as possible of the highly skilled specialists and pioneers in the sodium cooled fast reactor research and development area to be actively involved in the CRP. Thus, the first stage of the CRP will address feedback from operational experience with regard to

  12. Clad failure detection in G 3 - operational feedback; Detection de rupture de gaines G 3 - experience d'exploitation

    Energy Technology Data Exchange (ETDEWEB)

    Plisson, J [CEA Marcoule, Centre de Production de Plutonium, 30 (France)

    1964-07-01

    After briefly reviewing the role and the principles of clad failure detection, the author describes the working conditions and the conclusions reached after 4 years operation of this installation on the reactor G 3. He mentions also the modifications made to the original installation as well as the tests carried out and the experiments under way. (author) [French] Apres un rappel succinct du role et des principes de la detection de rupture de gaines, l'auteur fait un expose des conditions de fonctionnement et de l'experience tiree de 4 annees d'exploitation de cette installation sur le reacteur G 3. Il signale au passage les modifications apportees a l'installation d'origine, ainsi que les essais effectues, et les experiences en cours.

  13. Combining risk analysis and operating experience

    International Nuclear Information System (INIS)

    1986-10-01

    In recent years there has been an increasing interest in the systematic utilization of operating experience in the decision making process concerning large industrial facilities. Even before the advent of Probabilistic Safety Assessment (PSA), operating experience had always played an important role in such decisions. Of course, operating experience has always been an input to PSA also; however, as PSA becomes more mature and the quality and quantity of operating experience improve, greater emphasis is now being placed on the use of operating experience to update and validate PSA and thereby provide a more rational basis for decision making. This report outlines the ways in which data are collected, processed using mathematical techniques and utilized in decision making. It is not intended to provide details of the methods and procedures to be used in these areas, but is rather intended as an introduction to these topics and some of the relevant literature. The meeting presentations were divided into three sessions devoted to the following topics: evaluation of nuclear power plants operational experience (5 papers); uncertainties (2 papers); probabilistic safety assessment studies in Member States (7 papers). A separate abstract was prepared for each of these papers

  14. Feedback systems for linear colliders

    CERN Document Server

    Hendrickson, L; Himel, Thomas M; Minty, Michiko G; Phinney, N; Raimondi, Pantaleo; Raubenheimer, T O; Shoaee, H; Tenenbaum, P G

    1999-01-01

    Feedback systems are essential for stable operation of a linear collider, providing a cost-effective method for relaxing tight tolerances. In the Stanford Linear Collider (SLC), feedback controls beam parameters such as trajectory, energy, and intensity throughout the accelerator. A novel dithering optimization system which adjusts final focus parameters to maximize luminosity contributed to achieving record performance in the 1997-98 run. Performance limitations of the steering feedback have been investigated, and improvements have been made. For the Next Linear Collider (NLC), extensive feedback systems are planned as an intregal part of the design. Feedback requiremetns for JLC (the Japanese Linear Collider) are essentially identical to NLC; some of the TESLA requirements are similar but there are significant differences. For NLC, algorithms which incorporate improvements upon the SLC implementation are being prototyped. Specialized systems for the damping rings, rf and interaction point will operate at hi...

  15. Feedback from practical experience with large sodium fire accidents

    International Nuclear Information System (INIS)

    Luster, V.P.; Freudenstein, K.F.

    1996-01-01

    The paper reviews the important feedback from the practical experience from two large sodium fires; the first at ALMERIA in Spain and the second in the Na laboratories at Bensberg, Germany. One of the most important sodium fire accidents was the ALMERIA spray fire accident. The origin of this accident was the repair of a valve when about 14 t of sodium was spilled in the plant room over a period of 1/2 hour. The event has been reported (IAEA/IWGFR meeting in 1988) and this presentation gives a short review of important feedback. The Almeria accident was one of the reasons that from that time spray fires had to be taken into account in the safety analyses of nuclear power plants. Due to the fact that spray fire codes were not available in a sufficiently validated state, safety analyses were provisionally based on the feedback from sodium fire tests and also from the Almeria accident itself. The behaviour of spray fires showed that severe destruction, up to melting of metallic structures may occur, but even with a large spray fire is limited roughly within the spray fire zone itself. This could be subsequently be predicted by codes like NABRAND in Germany and FEUMIX in France. Almeria accident has accelerated R and D and code development with respect to spray fires. As example for a code validation some figures are given for the NABRAND code. Another large sodium fire accident happened in 1992 in the test facility at Bensberg in Germany (ILONA). This accident occurred during preheating of a sodium filled vessel which was provisionally installed in the basement of the ILONA test facility at Bensberg. Due to failure of a pressure relief valve the pressure in the vessel increased. As a consequence the plug in a dip tube for draining the vessel failed and about 4,5 t of sodium leaked slowly from the vessel. The plant room was not cladded with steel liners or collecting pans (it was not designed for permanent sodium plant operation). So leaking sodium came directly in

  16. ERB-II operating experience

    International Nuclear Information System (INIS)

    Smith, R.N.; Cissel, D.W.; Smith, R.R.

    1977-01-01

    As originally designed and operated, EBR-II successfully demonstrated the concept of a sodium-cooled fast breeder power plant with a closed fuel reprocessing cycle (mini-nuclear park). Subsequent operation has been as an irradiation facility, a role which will continue into the foreseeable future. Since the beginning of operation in 1961, operating experience of EBR-II has been very satisfactory. Most of the components and systems have performed well. In particular, the mechanical performance of heat-removal systems has been excellent. A review of the operating experience reveals that all the original design objectives have been successfully demonstrated. To date, no failures or incidents resulting in serious in-core or out-of-core consequences have occurred. No water-to-sodium leaks have been detected over the life of the plant. At the present time, the facility is operating very well and continuously except for short shutdowns required by maintenance, refueling, modification, and minor repair. A plant factor of 76.9% was achieved for the calendar year 1976

  17. Age vs. experience : evaluation of a video feedback intervention for newly licensed teen drivers.

    Science.gov (United States)

    2013-02-06

    This project examines the effects of age, experience, and video-based feedback on the rate and type of safety-relevant events captured on video event : recorders in the vehicles of three groups of newly licensed young drivers: : 1. 14.5- to 15.5-year...

  18. Nuclear power plant operating experiences from the IAEA/NEA Incident Reporting System 1999-2002

    International Nuclear Information System (INIS)

    2003-01-01

    Incident reporting has become an increasingly important aspect of the operation and regulation of all public health and safety-related industries. Diverse industries such as aeronautics, chemicals, pharmaceuticals and explosives all depend on operating experience feedback to provide lessons learned about safety. The Incident Reporting System (IRS) is an essential element of the system for feeding back international operating experience for nuclear power plants. IRS reports contain information on events of Safety significance with important lessons learned. These experiences assist in reducing or eliminating recurrence of events at other plants. The IRS is jointly operated and managed by the Nuclear Energy Agency (NEA), a semi-autonomous body within the Organisation for Economic Co-operation and Development (OECD), and the International Atomic Energy Agency (IAEA). It is important that sufficient national resources be allocated to enable timely and high quality reporting of events important to safety, and to share these events in the IRS database. The first report, which covered the period July 1996 - June 1999, was widely acclaimed and encouraged both agencies to prepare this second report in order to highlight important lessons learned from around 300 events reported to the IRS for the period July 1999 - December 2002. Several areas were selected in this report to show the range of important topics available in the IRS. These include different types of failure in a variety of plant systems, as well as human performance considerations. This report is primarily aimed at senior officials in industry and government who have decision-making roles in the nuclear power industry

  19. First feedback with the AMMON integral experiment for the JHR calculations

    Directory of Open Access Journals (Sweden)

    Lemaire M.

    2013-03-01

    Full Text Available The innovative design of the next international Material Testing Reactor, the Jules Horowitz Reactor (JHR, induced the development of a new neutron and photon calculation formular HORUS3D/P&N, based on deterministic and stochastic codes and the European nuclear data library JEFF3.1.1. A new integral experiment, named the AMMON experiment, was designed in order to make the experimental validation of HORUS3D. The objectives of this experimental program are to calibrate the biases and uncertainties associated with the HORUS3D/N&P calculations for JHR safety and design calculations, but also the validation of some specific nuclear data (concerning mainly hafnium and beryllium isotopes. The experiment began in 2010 and is currently performed in the EOLE zero-power critical mock-up at CEA Cadarache. This paper deals with the first feedback of the AMMON experiments with 3D Monte Carlo TRIPOLI4©/JEFF3.1.1 calculations.

  20. Operating experience: safety perspective

    International Nuclear Information System (INIS)

    Piplani, Vivek; Krishnamurthy, P.R.; Kumar, Neeraj; Upadhyay, Devendra

    2015-01-01

    Operating Experience (OE) provides valuable information for improving NPP safety. This may include events, precursors, deviations, deficiencies, problems, new insights to safety, good practices, lessons and corrective actions. As per INSAG-10, an OE program caters as a fundamental means for enhancing the defence-in-depth at NPPs and hence should be viewed as ‘Continuous Safety Performance Improvement Tool’. The ‘Convention on Nuclear Safety’ also recognizes the OE as a tool of high importance for enhancing the NPP safety and its Article 19 mandates each contracting party to establish an effective OE program at operating NPPs. The lessons drawn from major accidents at Three Mile Island, Chernobyl and Fukushima Daiichi NPPs had prompted nuclear stalwarts to change their safety perspective towards NPPs and to frame sound policies on issues like safety culture, severe accident prevention and mitigation. An effective OE program, besides correcting current/potential problems, help in proactively improving the NPP design, operating and maintenance procedures, practices, training, etc., and thus plays vital role in ensuring safe and efficient operation of NPPs. Further it enhances knowledge with regard to equipment operating characteristics, system performance trends and provides data for quantitative and qualitative safety analysis. Besides all above, an OE program inculcates a learning culture in the organisation and thus helps in continuously enhancing the expertise, technical competency and knowledge base of its staff. Nuclear and Radiation Facilities in India are regulated by Atomic Energy Regulatory Board (AERB). Operating Plants Safety Division (OPSD) of AERB is involved in managing operating experience activities. This paper provides insights about the operating experience program of OPSD, AERB (including its on-line data base namely OPSD STAR) and its utilisation in improving the regulations and safety at Indian NPPs/projects. (author)

  1. The impact of positive, negative and topical relevance feedback

    NARCIS (Netherlands)

    Kaptein, Rianne; Kamps, Jaap; Hiemstra, Djoerd

    2008-01-01

    This document contains a description of experiments for the 2008 Relevance Feedback track. We experiment with different amounts of feedback, including negative relevance feedback. Feedback is implemented using massive weighted query expansion. Parsimonious query expansion using only relevant

  2. Local beam position feedback experiments on the ESRF storage ring

    International Nuclear Information System (INIS)

    Chung, Y.; Kahana, E.; Kirchman, J.

    1995-01-01

    This paper describes the results of local beam position feedback experiments conducted on the ESRF storage ring using digital signal processing (DSP) under the trilateral agreement of collaboration among ESRF, APS, and SPring-8. Two rf beam position monitors (BPMS) in the, upstream and downstream of the insertion device (ID) and two x-ray BPMs in the sixth cell were used to monitor the electron beam and the x-ray beam emitted from the ID, respectively. The local bump coefficients were obtained using the technique of singular value decomposition (SVD) on the global response matrix for the bump magnets and all the available BPMs outside the local bump. The local response matrix was then obtained between the two three-magnet bumps and the position monitors. The data sampling frequency was 4 kHz and a proportional, integral, and derivative (PID) controller was used. The result indicates the closed-loop feedback bandwidth close to 100 Hz and clear attenuation (∼ -40 dB) of the 7-Hz beam motion due to girder vibration resonance. Comparison of the results using the rf BPMs and x-ray BPMs will be also discussed

  3. International feedback experience on the cutting of reactor internal components

    International Nuclear Information System (INIS)

    Boucau, J.

    2014-01-01

    Westinghouse capitalizes more than 30 years of experience in the cutting of internal components of reactor and their packaging in view of their storage. Westinghouse has developed and validated different methods for cutting: plasma torch cutting, high pressure abrasive water jet cutting, electric discharge cutting and mechanical cutting. A long feedback experience has enabled Westinghouse to list the pros and cons of each cutting technology. The plasma torch cutting is fast but rises dosimetry concerns linked to the control of the cuttings and the clarity of water. Abrasive water jet cutting requires the installation of costly safety devices and of an equipment for filtering water but this technology allows accurate cuttings in hard-to-reach zones. Mechanical cutting is the most favourable technology in terms of wastes generation and of the clarity of water but the cutting speed is low. (A.C.)

  4. Making the Most of the Operating Experience Feedback: Design of a Computerized Data Base Related to NPP Component Behavior

    International Nuclear Information System (INIS)

    Degrave, C.; Martin-Onraet, M.

    1998-01-01

    Electricite de France carries out several analyses on NPP component behavior every year. However, these analyses are conducted separately by specialists of only the kind of component and regardless of the time factor. Seven years ago, a working group from the Nuclear Operation Division completed a detailed examination of component behavior of the 50 NPP then in operation, over a ten-years period (from 1980 to 1990). These analyses have been centered on main components only. Today, another working group will integrate this operating experience in a computerized process to facilitate access to all the information contained in the data base. This system will be based on a site server allowing a user-friendly connection, and updated periodically. (author)

  5. A new visual feedback-based magnetorheological haptic master for robot-assisted minimally invasive surgery

    International Nuclear Information System (INIS)

    Choi, Seung-Hyun; Kim, Soomin; Kim, Pyunghwa; Park, Jinhyuk; Choi, Seung-Bok

    2015-01-01

    In this study, we developed a novel four-degrees-of-freedom haptic master using controllable magnetorheological (MR) fluid. We also integrated the haptic master with a vision device with image processing for robot-assisted minimally invasive surgery (RMIS). The proposed master can be used in RMIS as a haptic interface to provide the surgeon with a sense of touch by using both kinetic and kinesthetic information. The slave robot, which is manipulated with a proportional-integrative-derivative controller, uses a force sensor to obtain the desired forces from tissue contact, and these desired repulsive forces are then embodied through the MR haptic master. To verify the effectiveness of the haptic master, the desired force and actual force are compared in the time domain. In addition, a visual feedback system is implemented in the RMIS experiment to distinguish between the tumor and organ more clearly and provide better visibility to the operator. The hue-saturation-value color space is adopted for the image processing since it is often more intuitive than other color spaces. The image processing and haptic feedback are realized on surgery performance. In this work, tumor-cutting experiments are conducted under four different operating conditions: haptic feedback on, haptic feedback off, image processing on, and image processing off. The experimental realization shows that the performance index, which is a function of pixels, is different in the four operating conditions. (paper)

  6. Probability matching in risky choice: the interplay of feedback and strategy availability.

    Science.gov (United States)

    Newell, Ben R; Koehler, Derek J; James, Greta; Rakow, Tim; van Ravenzwaaij, Don

    2013-04-01

    Probability matching in sequential decision making is a striking violation of rational choice that has been observed in hundreds of experiments. Recent studies have demonstrated that matching persists even in described tasks in which all the information required for identifying a superior alternative strategy-maximizing-is present before the first choice is made. These studies have also indicated that maximizing increases when (1) the asymmetry in the availability of matching and maximizing strategies is reduced and (2) normatively irrelevant outcome feedback is provided. In the two experiments reported here, we examined the joint influences of these factors, revealing that strategy availability and outcome feedback operate on different time courses. Both behavioral and modeling results showed that while availability of the maximizing strategy increases the choice of maximizing early during the task, feedback appears to act more slowly to erode misconceptions about the task and to reinforce optimal responding. The results illuminate the interplay between "top-down" identification of choice strategies and "bottom-up" discovery of those strategies via feedback.

  7. Force-feedback tele operation of industrial robots a cost effective solution for decontamination of nuclear plants

    International Nuclear Information System (INIS)

    Desbats, P.; Andriot, C.; Gicquel, P.; Viallesoubranne, J.P.; Souche, C.

    1998-01-01

    Decontamination and maintenance in hot cells are some new emerging applications of industrial robots in the nuclear fuel cycle plants. Industrial robots are low cost, accurate and reliable manipulator arms which are used in manufacturing industries usually. Thanks to the recent evolution of robotics technologies, some industrial robots may be adapted to nuclear environment. These robots are transportable, sealed and can be decontaminated, and they may be 'hardened' up to a level of irradiation dose sufficient for operation in low and medium irradiating/contaminating environments. Although industrial robots are usually programmed to perform specific and repetitive tasks, they may be remotely tele-operated by human operators as well. This allows industrial robots to perform usual tele-manipulation tasks encountered in the nuclear plants and more. The paper presents the computer based tele-operation control system TAO2000 TM , developed by the Tele-operation and Robotics Service of CEA, which has been applied to the RX90 TM industrial robot from ST-UBLI company. This robot has been selected in order to perform various maintenance and decontamination tasks in COGEMA plants. TAO2000 provides the overall tele-robotic and robotic functions necessary to perform any remote tele-operation application in hostile environment: force-feedback master-slave control; computer- assisted tele-operation of mechanical processes; trajectory programming as well as various robotics functions; graphical modelling of working environment and simulation; automatic path planning with obstacle avoidance; man-machine interface for tasks programming and mission execution. Experimental results reported in the paper demonstrate the feasibility of force-feedback master-slave control of standard industrial robots. Finally, the design of new, cost effective. tele-operation systems based on industrial robots may be intended for nuclear plants maintenance. (author)

  8. Operating experience

    International Nuclear Information System (INIS)

    McRae, L.P.; Six, D.E.

    1991-01-01

    In 1987, Westinghouse Hanford Company began operating a first-generation integrated safeguards system in the Plutonium Finishing Plant storage vaults. This Vault Safety and Inventory System is designed to integrate data into a computer-based nuclear material inventory monitoring system. The system gathers, in real time, measured physical parameters that generate nuclear material inventory status data for thousands of stored items and sends tailored report to the appropriate users. These data include canister temperature an bulge data reported to Plant Operations and Material Control and Accountability personnel, item presence and identification data reported to Material Control and Accountability personnel, and unauthorized item movement data reported to Security response forces and Material Control and Accountability personnel. The Westinghouse Hanford Company's experience and operational benefits in using this system for reduce radiation exposure, increase protection against insider threat, and real-time inventory control are discussed in this paper

  9. RF feedback for KEKB

    Energy Technology Data Exchange (ETDEWEB)

    Ezura, Eizi; Yoshimoto, Shin-ichi; Akai, Kazunori [National Lab. for High Energy Physics, Tsukuba, Ibaraki (Japan)

    1996-08-01

    This paper describes the present status of the RF feedback development for the KEK B-Factory (KEKB). A preliminary experiment concerning the RF feedback using a parallel comb-filter was performed through a choke-mode cavity and a klystron. The RF feedback has been tested using the beam of the TRISTAN Main Ring, and has proved to be effective in damping the beam instability. (author)

  10. The relative importance of real-time in-cab and external feedback in managing fatigue in real-world commercial transport operations.

    Science.gov (United States)

    Fitzharris, Michael; Liu, Sara; Stephens, Amanda N; Lenné, Michael G

    2017-05-29

    Real-time driver monitoring systems represent a solution to address key behavioral risks as they occur, particularly distraction and fatigue. The efficacy of these systems in real-world settings is largely unknown. This article has three objectives: (1) to document the incidence and duration of fatigue in real-world commercial truck-driving operations, (2) to determine the reduction, if any, in the incidence of fatigue episodes associated with providing feedback, and (3) to tease apart the relative contribution of in-cab warnings from 24/7 monitoring and feedback to employers. Data collected from a commercially available in-vehicle camera-based driver monitoring system installed in a commercial truck fleet operating in Australia were analyzed. The real-time driver monitoring system makes continuous assessments of driver drowsiness based on eyelid position and other factors. Data were collected in a baseline period where no feedback was provided to drivers. Real-time feedback to drivers then occurred via in-cab auditory and haptic warnings, which were further enhanced by direct feedback by company management when fatigue events were detected by external 24/7 monitors. Fatigue incidence rates and their timing of occurrence across the three time periods were compared. Relative to no feedback being provided to drivers when fatigue events were detected, in-cab warnings resulted in a 66% reduction in fatigue events, with a 95% reduction achieved by the real-time provision of direct feedback in addition to in-cab warnings (p safety culture of the company in terms of how the information is used. Data were analysed on a per-truck trip basis, and the findings are indicative of fatigue events in a large-scale commercial transport fleet. Future research ought to account for individual driver performance, which was not possible with the available data in this retrospective analysis. Evidence that real-time driver monitoring feedback is effective in reducing fatigue events is

  11. Feedback in Clinical Education, Part I: Characteristics of Feedback Provided by Approved Clinical Instructors

    Science.gov (United States)

    Nottingham, Sara; Henning, Jolene

    2014-01-01

    Context Providing students with feedback is an important component of athletic training clinical education; however, little information is known about the feedback that Approved Clinical Instructors (ACIs; now known as preceptors) currently provide to athletic training students (ATSs). Objective To characterize the feedback provided by ACIs to ATSs during clinical education experiences. Design Qualitative study. Setting One National Collegiate Athletic Association Division I athletic training facility and 1 outpatient rehabilitation clinic that were clinical sites for 1 entry-level master's degree program accredited by the Commission on Accreditation of Athletic Training Education. Patients or Other Participants A total of 4 ACIs with various experience levels and 4 second-year ATSs. Data Collection and Analysis Extensive field observations were audio recorded, transcribed, and integrated with field notes for analysis. The constant comparative approach of open, axial, and selective coding was used to inductively analyze data and develop codes and categories. Member checking, triangulation, and peer debriefing were used to promote trustworthiness of the study. Results The ACIs gave 88 feedback statements in 45 hours and 10 minutes of observation. Characteristics of feedback categories included purpose, timing, specificity, content, form, and privacy. Conclusions Feedback that ACIs provided included several components that made each feedback exchange unique. The ACIs in our study provided feedback that is supported by the literature, suggesting that ACIs are using current recommendations for providing feedback. Feedback needs to be investigated across multiple athletic training education programs to gain more understanding of certain areas of feedback, including frequency, privacy, and form. PMID:24143902

  12. Operating experience with snubbers

    International Nuclear Information System (INIS)

    Levin, H.; Cudlin, R.

    1978-06-01

    Recent operating experience with hydraulic and mechanical snubbers has indicated that there is a need to evaluate current practice in the industry associated with snubber qualification testing programs, design and analysis procedures, selection and specification criteria, and the preservice inspection and inservice surveillance programs. The report provides a summary of operational experiences that represent problems that are generic throughout the industry. Generic Task A-13 is part of the NRC Program for the Resolution of Generic Issues Related to Nuclear Power Plants described in NUREG-0410. The report is based upon a rather large amount of data that have become available in the past four years. These data have been evaluated by the Division of Operating Reactors to develop a data base for use in connection with several NRC activities including Category A, Technical Activity A-13 (Snubbers); the Standard Review Plan; future Regulatory Guides; ASME Code Provisions; and various technical specifications of operating nuclear power plants

  13. Track 5: safety in engineering, construction, operations, and maintenance. Reactor physics design, validation, and operating experience. 5. A Negative Reactivity Feedback Device for Actinide Burner Cores

    International Nuclear Information System (INIS)

    Driscoll, M.J.; Hejzlar, P.

    2001-01-01

    Lead-bismuth eutectic (LBE) cooled reactors are of considerable interest because they may be useful for destruction of actinides in a cost-effective manner, particularly cores fueled predominantly with minor actinides, which gain reactivity with burnup. However, they also pose several design challenges: 1. a small (and perhaps even slightly positive) Doppler feedback; 2. small effective delayed neutron yield; 3. a small negative feedback from axial fuel expansion; 4. positive coolant void and temperature coefficients for conventional designs. This has motivated a search for palliative measures, leading to conceptualization of the reactivity feedback device (RFD). The RFD consists of an in-core flask containing helium gas, tungsten wool, and a small reservoir of LBE that communicates with vertical tubes housing neutron absorber floats. The upper part of these guide tubes contains helium gas that is vented into a separate, cooler ex-core helium gas plenum. The principle of operation is as follows: 1. The tungsten wool, hence the helium gas in the in-core plenum, is heated by gammas and loses heat to the walls by convection and conduction (radiation is feeble for monatomic gases and, in any event, intercepted by the tungsten wool). An energy balance determines the gas temperature, hence, pressure, which is 10 atm here. The energy loss rate can be adjusted by using xenon or a gas mixture in place of helium. The tungsten wool mass, which is 1 vol% wool here, can also be increased to increase gamma heating and further retard convection; alternatively, a Dewar flask could be used in place of the additional wool. 2. An increase in core power causes a virtually instantaneous increase in gamma flux, hence, gas heatup: The thermal time constant of the tungsten filaments and their surrounding gas film is ∼40 μs. 3. The increased gas temperature is associated with an increased gas pressure, which forces more liquid metal into the float guide tubes: LBE will rise ∼100 cm

  14. Design of the control room of the N4-type PWR: main features and feedback operating experience; La salle de commande du palier N4: principales caracteristiques et retour d'experience d'exploitation

    Energy Technology Data Exchange (ETDEWEB)

    Peyrouton, J.M.; Guillas, J.; Nougaret, Ch. [Electricite de France (EDF/DPN/CAPE), 93 - Saint-Denis (France)

    2004-07-01

    This article presents the design, specificities and innovating features of the control room of the N4-type PWR. A brief description of control rooms of previous 900 MW and 1300 MW -type PWR allows us to assess the change. The design of the first control room dates back to 1972, at that time 2 considerations were taken into account: first the design has to be similar to that of control rooms for thermal plants because plant operators were satisfied with it and secondly the normal operating situation has to be privileged to the prejudice of accidental situations just as it was in a thermal plant. The turning point was the TMI accident that showed the weight of human factor in accidental situations in terms of pilot team, training, procedures and the ergonomics of the work station. The impact of TMI can be seen in the design of 1300 MW-type PWR. In the beginning of the eighties EDF decided to launch a study for a complete overhaul of the control room concept, the aim was to continue reducing the human factor risk and to provide a better quality of piloting the plant in any situation. The result is the control room of the N4-type PWR. Today the cumulated feedback experience of N4 control rooms represents more than 20 years over a wide range of situations from normal to incidental, a survey shows that the N4 design has fulfilled its aims. (A.C.)

  15. Soil feedback and pathogen activity in Prunus serotina throughout its native range

    NARCIS (Netherlands)

    Reinhart, K.O.; Royo, A.A.; Putten, van der W.H.; Clay, K.

    2005-01-01

    1 Oomycete soil pathogens are known to have a negative effect on Prunus serotina seedling establishment and to promote tree diversity in a deciduous forest in Indiana, USA. Here, we investigate whether negative feedbacks operate widely in its native range in eastern USA. 2 In laboratory experiments,

  16. Feedback Loop Gains and Feedback Behavior (1996)

    DEFF Research Database (Denmark)

    Kampmann, Christian Erik

    2012-01-01

    Linking feedback loops and system behavior is part of the foundation of system dynamics, yet the lack of formal tools has so far prevented a systematic application of the concept, except for very simple systems. Having such tools at their disposal would be a great help to analysts in understanding...... large, complicated simulation models. The paper applies tools from graph theory formally linking individual feedback loop strengths to the system eigenvalues. The significance of a link or a loop gain and an eigenvalue can be expressed in the eigenvalue elasticity, i.e., the relative change...... of an eigenvalue resulting from a relative change in the gain. The elasticities of individual links and loops may be found through simple matrix operations on the linearized system. Even though the number of feedback loops can grow rapidly with system size, reaching astronomical proportions even for modest systems...

  17. 14 CFR 121.434 - Operating experience, operating cycles, and consolidation of knowledge and skills.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Operating experience, operating cycles, and... Qualifications § 121.434 Operating experience, operating cycles, and consolidation of knowledge and skills. (a... position, the operating experience, operating cycles, and the line operating flight time for consolidation...

  18. Feasibility of international data collection and feedback on post-operative pain data: proof of concept.

    Science.gov (United States)

    Zaslansky, R; Chapman, C R; Rothaug, J; Bäckström, R; Brill, S; Davidson, E; Elessi, K; Fletcher, D; Fodor, L; Karanja, E; Konrad, C; Kopf, A; Leykin, Y; Lipman, A; Puig, M; Rawal, N; Schug, S; Ullrich, K; Volk, T; Meissner, W

    2012-03-01

    Post-operative pain exacts a high toll from patients, families, healthcare professionals and healthcare systems worldwide. PAIN-OUT is a research project funded by the European Union's 7th Framework Program designed to develop effective, evidence-based approaches to improve pain management after surgery, including creating a registry for feedback, benchmarking and decision support. In preparation for PAIN-OUT, we conducted a pilot study to evaluate the feasibility of international data collection with feedback to participating sites. Adult orthopaedic or general surgery patients consented to participate between May and October 2008 at 14 collaborating hospitals in 13 countries. Project staff collected patient-reported outcomes and process data from 688 patients and entered the data into an online database. Project staff in 10 institutions met the enrolment criteria of collecting data from at least 50 patients. The completeness and quality of the data, as assessed by rate of missing data, were acceptable; only 2% of process data and 0.06% of patient-reported outcome data were missing. Participating institutions received access to select items as Web-based feedback comparing their outcomes to those of the other sites, presented anonymously. We achieved proof of concept because staff and patients in all 14 sites cooperated well despite marked differences in cultures, nationalities and languages, and a central database management team was able to provide valuable feedback to all. © 2011 European Federation of International Association for the Study of Pain Chapters.

  19. Recognition of boundary feedback systems

    DEFF Research Database (Denmark)

    Pedersen, Michael

    1989-01-01

    A system that has been the object of intense research is outlined. In view of that and recent progress of the theory of pseudodifferential boundary operator calculus, the author describes some features that could prove to be interesting in connection with the problems of boundary feedback stabili...... stabilizability. It is shown that it is possible to use the calculus to consider more general feedback systems in a variational setup.......A system that has been the object of intense research is outlined. In view of that and recent progress of the theory of pseudodifferential boundary operator calculus, the author describes some features that could prove to be interesting in connection with the problems of boundary feedback...

  20. Operating experience review for the AP1000 plant

    International Nuclear Information System (INIS)

    Chaney, T. E.; Lipner, M. H.

    2006-01-01

    Westinghouse is performing an update to the Operating Experience Review (OER) Report for the AP1000 project to account for operating experience since December 1996. Significant Operating Experience Reports, Significant Event Reports, Significant Event Notifications, Operations and Maintenance Reminders, Topical Reports, Event Analysis Reports and Licensee Event Reports were researched for pertinent input to the update. As a part of the OER, Westinghouse has also conducted operator interviews and observations during simulated plant operations and after operating events. The main purpose of the OER is to identify Human Factors Engineering (HFE) related safety issues from existing operating plant experience and to ensure that these issues are addressed in the new design. The issues and lessons learned regarding operating experience provide a basis for improving the plant design. (authors)

  1. Are Success and Failure Experiences Equally Motivational? An Investigation of Regulatory Focus and Feedback

    Science.gov (United States)

    Shu, Tse-Mei; Lam, Shui-fong

    2011-01-01

    The present study extended regulatory focus theory (Idson & Higgins, 2000) to an educational setting and attempted to identify individuals with high motivation after both success and failure feedback. College students in Hong Kong (N = 180) participated in an experiment with a 2 promotion focus (high vs. low) x 2 prevention focus (high vs.…

  2. Feedback to Suppress Phase Noise at Aladdin

    CERN Document Server

    Bosch, Robert A; Kleman, Kevin J

    2005-01-01

    The performance of the Aladdin infrared beamline is adversely affected by a Robinson mode in which all bunches move in unison with a frequency of 3 kHz. To decrease these oscillations, feedback has been installed in the radiofrequency system to damp longitudinal motion of the bunch centroids. Simulations indicate that at frequencies around 3 kHz, the phase noise generated by Robinson modes may be reduced 20 dB by feedback with a damping time of 0.3 ms. This agrees with the measured performance of feedback circuitry. Since the feedback greatly improves operation of the infrared beamline, it is now incorporated into the standard operation of Aladdin.

  3. Multibunch feedback: Strategy, technology and implementation options

    International Nuclear Information System (INIS)

    Fox, J.D.; Eisen, N.; Hindi, H.; Oxoby, G.; Sapozhnikov, L.; Linscott, I.; Serio, M.

    1992-10-01

    The proposed next generation accelerator and synchrotron light facilities will require active feedback systems to control multi-bunch instabilities. These feedback systems must operate in machines with thousands of circulating bunches and with short (2--4 ns) interbunch intervals. The functional requirements for transverse (betatron) and longitudinal (synchrotron) feedback systems are presented. Several possible implementation options are discussed and system requirements developed. Results are presented from a digital signal processing based synchrotron oscillation damper operating at the SSRL/SLAC SPEAR storage ring

  4. Atmospheric radiative feedbacks associated with transient climate change and climate variability

    Energy Technology Data Exchange (ETDEWEB)

    Colman, Robert A.; Power, Scott B. [Bureau of Meteorology, Centre for Australian Weather and Climate Research, GPO Box 1289, Melbourne, VIC (Australia)

    2010-06-15

    This study examines in detail the 'atmospheric' radiative feedbacks operating in a coupled General Circulation Model (GCM). These feedbacks (defined as the change in top of atmosphere radiation per degree of global surface temperature change) are due to responses in water vapour, lapse rate, clouds and surface albedo. Two types of radiative feedback in particular are considered: those arising from century scale 'transient' warming (from a 1% per annum compounded CO{sub 2} increase), and those operating under the model's own unforced 'natural' variability. The time evolution of the transient (or 'secular') feedbacks is first examined. It is found that both the global strength and the latitudinal distributions of these feedbacks are established within the first two or three decades of warming, and thereafter change relatively little out to 100 years. They also closely approximate those found under equilibrium warming from a 'mixed layer' ocean version of the same model forced by a doubling of CO{sub 2}. These secular feedbacks are then compared with those operating under unforced (interannual) variability. For water vapour, the interannual feedback is only around two-thirds the strength of the secular feedback. The pattern reveals widespread regions of negative feedback in the interannual case, in turn resulting from patterns of circulation change and regions of decreasing as well as increasing surface temperature. Considering the vertical structure of the two, it is found that although positive net mid to upper tropospheric contributions dominate both, they are weaker (and occur lower) under interannual variability than under secular change and are more narrowly confined to the tropics. Lapse rate feedback from variability shows weak negative feedback over low latitudes combined with strong positive feedback in mid-to-high latitudes resulting in no net global feedback - in contrast to the dominant negative low

  5. The impact of external optical feedback on the degradation behavior of high-power diode lasers

    DEFF Research Database (Denmark)

    Hempel, Martin; Chi, Mingjun; Petersen, Paul Michael

    2013-01-01

    The impact of external feedback on high-power diode laser degradation is studied. For this purpose early stages of gradual degradation are prepared by accelerated aging of 808-nm-emitting AlGaAs-based devices. While the quantum well that actually experiences the highest total optical load remains...... unaffected, severe impact is observed to the cladding layers and the waveguide. Consequently hardening of diode lasers for operation under external optical feedback must necessarily involve claddings and waveguide, into which the quantum well is embedded.......The impact of external feedback on high-power diode laser degradation is studied. For this purpose early stages of gradual degradation are prepared by accelerated aging of 808-nm-emitting AlGaAs-based devices. While the quantum well that actually experiences the highest total optical load remains...

  6. Gamification and Smart, Competence-Centered Feedback: Promising Experiences in the Classroom

    Directory of Open Access Journals (Sweden)

    Michael D. Kickmeier-Rust

    2014-02-01

    Full Text Available Gamification appears being a promising approach to utilize the strong motivational potential of “gaming” in classroom without suffering from shortcomings such as low efficiency, weak pedagogy, or maybe most importantly the high costs. In the context of a European project we developed a rather light weight tool for learning and practicing multiplications. The target age group of the tool is 6 to 8 years. To benefit from the motivational potential of games we used a “gamification” approach. Accordingly we designed and developed a game-like, attractive user interface and integrated aspects of competition. The system is capable of providing students formative, competence-oriented feedback in real-time. Tailored to the age group this feedback is presented in form of a ninja character. For an experimental comparison of the effects of different feedback modes, we realized the conditions (i no feedback, (ii written only right/wrong feedback, (iii audio right/wrong feedback, and (iv competence-based, smart formative feedback. We applied and evaluated the tool in Austrian classrooms and found some evidence for the motivational aspect of the gamification elements, in particular the scoring. We also found strong positive effects of an individualized and meaningful feedback about achievements and progress.

  7. Digitally tunable dual wavelength emission from semiconductor ring lasers with filtered optical feedback

    International Nuclear Information System (INIS)

    Khoder, Mulham; Verschaffelt, Guy; Nguimdo, Romain Modeste; Danckaert, Jan; Leijtens, Xaveer; Bolk, Jeroen

    2013-01-01

    We report on a novel integrated approach to obtain dual wavelength emission from a semiconductor laser based on on-chip filtered optical feedback. Using this approach, we show experiments and numerical simulations of dual wavelength emission of a semiconductor ring laser. The filtered optical feedback is realized on-chip by employing two arrayed waveguide gratings to split/recombine light into different wavelength channels. Semiconductor optical amplifiers are placed in the feedback loop in order to control the feedback strength of each wavelength channel independently. By tuning the current injected into each of the amplifiers, we can effectively cancel the gain difference between the wavelength channels due to fabrication and material dichroism, thus resulting in stable dual wavelength emission. We also explore the accuracy needed in the operational parameters to maintain this dual wavelength emission. (letter)

  8. Enhanced operator perception through 3D vision and haptic feedback

    Science.gov (United States)

    Edmondson, Richard; Light, Kenneth; Bodenhamer, Andrew; Bosscher, Paul; Wilkinson, Loren

    2012-06-01

    Polaris Sensor Technologies (PST) has developed a stereo vision upgrade kit for TALON® robot systems comprised of a replacement gripper camera and a replacement mast zoom camera on the robot, and a replacement display in the Operator Control Unit (OCU). Harris Corporation has developed a haptic manipulation upgrade for TALON® robot systems comprised of a replacement arm and gripper and an OCU that provides haptic (force) feedback. PST and Harris have recently collaborated to integrate the 3D vision system with the haptic manipulation system. In multiple studies done at Fort Leonard Wood, Missouri it has been shown that 3D vision and haptics provide more intuitive perception of complicated scenery and improved robot arm control, allowing for improved mission performance and the potential for reduced time on target. This paper discusses the potential benefits of these enhancements to robotic systems used for the domestic homeland security mission.

  9. Clad failure detection in G 3 - operational feedback

    International Nuclear Information System (INIS)

    Plisson, J.

    1964-01-01

    After briefly reviewing the role and the principles of clad failure detection, the author describes the working conditions and the conclusions reached after 4 years operation of this installation on the reactor G 3. He mentions also the modifications made to the original installation as well as the tests carried out and the experiments under way. (author) [fr

  10. ATLAS IBL operational experience

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00237659; The ATLAS collaboration

    2017-01-01

    The Insertable B-Layer (IBL) is the inner most pixel layer in the ATLAS experiment, which was installed at 3.3 cm radius from the beam axis in 2014 to improve the tracking performance. To cope with the high radiation and hit occupancy due to proximity to the interaction point, a new read-out chip and two different silicon sensor technologies (planar and 3D) have been developed for the IBL. After the long shut-down period over 2013 and 2014, the ATLAS experiment started data-taking in May 2015 for Run-2 of the Large Hadron Collider (LHC). The IBL has been operated successfully since the beginning of Run-2 and shows excellent performance with the low dead module fraction, high data-taking efficiency and improved tracking capability. The experience and challenges in the operation of the IBL is described as well as its performance.

  11. Operating Experience with Power Reactors. Proceedings of the Conference on Operating Experience with Power Reactors. Vol. I

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1963-10-15

    At the beginning of 1963 nuclear power plants produced some 3 500 000kW of electrical power to different distribution grids around the world. Much significant operating experience has been gained with these power reactors, but this experience is often not collected in such a way as to make it easily available. The International Atomic Energy Agency convened a Conference on Operating Experience with Power Reactors in Vienna from 4-8 June 1963 which was attended by 240 participants representing 27 of the Agency's Member States and six international organizations. At the Conference, 42 papers giving detailed experience with more than 20 nuclear power stations were discussed. Although similar meetings on a national or regional scale have been held earlier in various countries, this is the first arranged by the Agency on a world-wide basis. Some of the detailed material may have been given earlier but for the most part it represents new and recently acquired experience, and for the first time it has been possible to compile in one place such extensive material on the operating experience with power reactors. The Conference discussed the experience gained both generally in the context of national and international nuclear power development programmes, and more specifically in the detailed operating experience with different power reactor stations. In addition, various plant components, fuel cycles, staffing of nuclear plants and licensing of such staff were treated. It is hoped that these Proceedings will be of interest not only to nuclear plant designers and operators who daily encounter problems similar to those discussed by the Conference, but also to those guiding the planning and implementation of power development programmes.

  12. Operating Experience with Power Reactors. Proceedings of the Conference on Operating Experience with Power Reactors. Vol. II

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1963-10-15

    At the beginning of 1963 nuclear power plants produced some 3 500 000 kW of electrical power to different distribution grids around the world. Much significant operating experience has been gained with these power reactors, but this experience is often not collected in such a way as to make it easily available. The International Atomic Energy Agency convened a Conference on Operating Experience with Power Reactors in Vienna from 4 -8 June 1963 which was attended by 240 participants representing 27 of the Agency's Member States and six international organizations. At the Conference, 42 papers giving detailed experience with more than 20 nuclear power stations were discussed. Although similar meetings on a national or regional scale have been held earlier in various countries, this is the first arranged by the Agency on a world-wide basis. Some of the detailed material may have been given earlier but for the most part it represents new and recently acquired experience, and for the first time it has been possible to compile in one place such extensive material on the operating experience with power reactors. The Conference discussed the experience gained both generally in the context of national and international nuclear power development programmes, and more specifically in the detailed operating experience with different power reactor stations. In addition, various plant components, fuel cycles, staffing of nuclear plants and licensing of such staff were treated. It is hoped that these Proceedings will be of interest not only to nuclear , plant designers and operators who daily encounter problems similar to those discussed by the Conference, but also to those guiding the planning and implementation of power development programmes.

  13. Feedback and efficient behavior.

    Directory of Open Access Journals (Sweden)

    Sandro Casal

    Full Text Available Feedback is an effective tool for promoting efficient behavior: it enhances individuals' awareness of choice consequences in complex settings. Our study aims to isolate the mechanisms underlying the effects of feedback on achieving efficient behavior in a controlled environment. We design a laboratory experiment in which individuals are not aware of the consequences of different alternatives and, thus, cannot easily identify the efficient ones. We introduce feedback as a mechanism to enhance the awareness of consequences and to stimulate exploration and search for efficient alternatives. We assess the efficacy of three different types of intervention: provision of social information, manipulation of the frequency, and framing of feedback. We find that feedback is most effective when it is framed in terms of losses, that it reduces efficiency when it includes information about inefficient peers' behavior, and that a lower frequency of feedback does not disrupt efficiency. By quantifying the effect of different types of feedback, our study suggests useful insights for policymakers.

  14. Regulatory challenges in using nuclear operating experience

    International Nuclear Information System (INIS)

    2006-01-01

    The fundamental objective of all nuclear safety regulatory bodies is to ensure that nuclear utilities operate their plants in an acceptably safe manner at all times. Learning from experience has been a key element in meeting this objective. It is therefore very important for nuclear power plant operators to have an active programme for collecting, analysing and acting on the lessons of operating experience that could affect the safety of their plants. NEA experts have noted that almost all of the recent, significant events reported at international meetings have occurred earlier in one form or another. Counteractions are usually well-known, but information does not always seem to reach end users, or corrective action programmes are not always rigorously applied. Thus, one of the challenges that needs to be met in order to maintain good operational safety performance is to ensure that operating experience is promptly reported to established reporting systems, preferably international in order to benefit from a larger base of experience, and that the lessons from operating experience are actually used to promote safety. This report focuses on how regulatory bodies can ensure that operating experience is used effectively to promote the safety of nuclear power plants. While directed at nuclear power plants, the principles in this report may apply to other nuclear facilities as well. (author)

  15. The Art of Giving Online Feedback

    Science.gov (United States)

    Leibold, Nancyruth; Schwarz, Laura Marie

    2015-01-01

    The cultivation of providing online feedback that is positive, effective, and enhances the learning experience is a valuable educator skill. Acquisition of the art of providing feedback is through education, practice, and faculty development. This article provides information about the best practices for delivering online feedback to learners. An…

  16. Feedback for Thought: Examining the Influence of Feedback Constituents on Learning Experience

    Science.gov (United States)

    Aoun, Chadi; Vatanasakdakul, Savanid; Ang, Karyne

    2018-01-01

    Reflective teaching practice is often heralded as a pillar of effective tuition. However, the perceptions of multiple forms of feedback among learners and their contributions to reflective learning is yet to attract significant attention, particularly in the Information Systems (IS) context. This research investigates the antecedent constituents…

  17. The impact of parametrized convection on cloud feedback

    Science.gov (United States)

    Webb, Mark J.; Lock, Adrian P.; Bretherton, Christopher S.; Bony, Sandrine; Cole, Jason N. S.; Idelkadi, Abderrahmane; Kang, Sarah M.; Koshiro, Tsuyoshi; Kawai, Hideaki; Ogura, Tomoo; Roehrig, Romain; Shin, Yechul; Mauritsen, Thorsten; Sherwood, Steven C.; Vial, Jessica; Watanabe, Masahiro; Woelfle, Matthew D.; Zhao, Ming

    2015-01-01

    We investigate the sensitivity of cloud feedbacks to the use of convective parametrizations by repeating the CMIP5/CFMIP-2 AMIP/AMIP + 4K uniform sea surface temperature perturbation experiments with 10 climate models which have had their convective parametrizations turned off. Previous studies have suggested that differences between parametrized convection schemes are a leading source of inter-model spread in cloud feedbacks. We find however that ‘ConvOff’ models with convection switched off have a similar overall range of cloud feedbacks compared with the standard configurations. Furthermore, applying a simple bias correction method to allow for differences in present-day global cloud radiative effects substantially reduces the differences between the cloud feedbacks with and without parametrized convection in the individual models. We conclude that, while parametrized convection influences the strength of the cloud feedbacks substantially in some models, other processes must also contribute substantially to the overall inter-model spread. The positive shortwave cloud feedbacks seen in the models in subtropical regimes associated with shallow clouds are still present in the ConvOff experiments. Inter-model spread in shortwave cloud feedback increases slightly in regimes associated with trade cumulus in the ConvOff experiments but is quite similar in the most stable subtropical regimes associated with stratocumulus clouds. Inter-model spread in longwave cloud feedbacks in strongly precipitating regions of the tropics is substantially reduced in the ConvOff experiments however, indicating a considerable local contribution from differences in the details of convective parametrizations. In both standard and ConvOff experiments, models with less mid-level cloud and less moist static energy near the top of the boundary layer tend to have more positive tropical cloud feedbacks. The role of non-convective processes in contributing to inter-model spread in cloud

  18. Efficient phase locking of two dual-wavelength fiber amplifiers by an all-optical self-feedback loop

    Science.gov (United States)

    Lei, Bing; Chen, Keshan; Yao, Tianfu; Shi, Jianhua; Hu, Haojun

    2017-10-01

    Efficient phase locking of two dual-wavelength fiber amplifiers has been demonstrated by using a self-feedback coupling and intracavity filtering configuration, and the effect of bandwidth and wavelength spacing on their phase locking performances have been investigated in experiment. Two independent fiber lasers with different operating wavelength were combined incoherently by a 3 dB fiber coupler to form a dual-wavelength seed source laser, which was injected into the fiber amplifiers' coupling array through the self-feedback loop. The effect of bandwidth and wavelength spacing was researched by altering the seed laser's pump power and operating wavelengths respectively. As long as the feedback loop and the single-mode fiber filtering configuration were well constructed in the unidirectional ring laser cavity, stable phase locking states and high fringe visibility interference patterns could always be obtained in our experiment. When the spacing of two operating wavelength was varied from 1.6 nm to 19.6 nm, the fringe visibility decreased slightly with the increase of wavelength spacing, and the corresponding fringe visibility was always larger than 0.6. In conclusion, we believe that efficient phase locking of several multi-wavelength laser sources is also feasible by passive self-adjusting methods, and keeping the component laser beams' phase relationship stable and fixed is more important than controlling their operating wavelengths.

  19. Dynamics of nonlinear feedback control

    OpenAIRE

    Snippe, H.P.; Hateren, J.H. van

    2007-01-01

    Feedback control in neural systems is ubiquitous. Here we study the mathematics of nonlinear feedback control. We compare models in which the input is multiplied by a dynamic gain (multiplicative control) with models in which the input is divided by a dynamic attenuation (divisive control). The gain signal (resp. the attenuation signal) is obtained through a concatenation of an instantaneous nonlinearity and a linear low-pass filter operating on the output of the feedback loop. For input step...

  20. Effects of realistic force feedback in a robotic assisted minimally invasive surgery system.

    Science.gov (United States)

    Moradi Dalvand, Mohsen; Shirinzadeh, Bijan; Nahavandi, Saeid; Smith, Julian

    2014-06-01

    Robotic assisted minimally invasive surgery systems not only have the advantages of traditional laparoscopic procedures but also restore the surgeon's hand-eye coordination and improve the surgeon's precision by filtering hand tremors. Unfortunately, these benefits have come at the expense of the surgeon's ability to feel. Several research efforts have already attempted to restore this feature and study the effects of force feedback in robotic systems. The proposed methods and studies have some shortcomings. The main focus of this research is to overcome some of these limitations and to study the effects of force feedback in palpation in a more realistic fashion. A parallel robot assisted minimally invasive surgery system (PRAMiSS) with force feedback capabilities was employed to study the effects of realistic force feedback in palpation of artificial tissue samples. PRAMiSS is capable of actually measuring the tip/tissue interaction forces directly from the surgery site. Four sets of experiments using only vision feedback, only force feedback, simultaneous force and vision feedback and direct manipulation were conducted to evaluate the role of sensory feedback from sideways tip/tissue interaction forces with a scale factor of 100% in characterising tissues of varying stiffness. Twenty human subjects were involved in the experiments for at least 1440 trials. Friedman and Wilcoxon signed-rank tests were employed to statistically analyse the experimental results. Providing realistic force feedback in robotic assisted surgery systems improves the quality of tissue characterization procedures. Force feedback capability also increases the certainty of characterizing soft tissues compared with direct palpation using the lateral sides of index fingers. The force feedback capability can improve the quality of palpation and characterization of soft tissues of varying stiffness by restoring sense of touch in robotic assisted minimally invasive surgery operations.

  1. Design and experimental results of feedback control of Ohmic-heating transformer magnetic flux by LHCD power in HT-7 Tokamak

    International Nuclear Information System (INIS)

    Yiyun Huang

    2006-01-01

    In order to make a research on long pulse or even steady state operation with non-inductive drive in plasma discharge, a new feedback control scheme instead of the previous one has been designed and operated in HT-7 [HT-7 team presented by J. Li, et al., Plasma Phys. Control. Fusion 42 (2) (2000) 135-146] Tokamak experiment, 2004. Consumption of iron-core transformer magnetic flux (MFT) is feedback controlled for the first time by power of lower hybrid current drive (LHCD) P LH , when the Ohmic-heating circuit current can maintain the plasma current I P constant with another feedback control loop, which make MFT evolve at alternating-change state to avoid flux saturation. Plasma current I P can be maintained steadily up to 120s in this operation mode at reduced plasma parameters (I P ∼50-100KA, average density n-bar e =0.4-0.5x10 19 m -3 , P LH =100-200KW). Design and experimental results are presented in the paper, which including control model analysis, configurations of control system and MFT feedback control experiments in HT-7. The high voltage power supply (HVPS) of LHCD is the main controller that regulates the LHCD power into the plasma to control the MFT

  2. Feedback from incident reporting: information and action to improve patient safety.

    Science.gov (United States)

    Benn, J; Koutantji, M; Wallace, L; Spurgeon, P; Rejman, M; Healey, A; Vincent, C

    2009-02-01

    Effective feedback from incident reporting systems in healthcare is essential if organisations are to learn from failures in the delivery of care. Despite the wide-scale development and implementation of incident reporting in healthcare, studies in the UK suggest that information concerning system vulnerabilities could be better applied to improve operational safety within organisations. In this article, the findings and implications of research to identify forms of effective feedback from incident reporting are discussed, to promote best practices in this area. The research comprised a mixed methods review to investigate mechanisms of effective feedback for healthcare, drawing upon experience within established reporting programmes in high-risk industry and transport domains. Systematic searches of published literature were undertaken, and 23 case studies describing incident reporting programmes with feedback were identified for analysis from the international healthcare literature. Semistructured interviews were undertaken with 19 subject matter experts across a range of domains, including: civil aviation, maritime, energy, rail, offshore production and healthcare. In analysis, qualitative information from several sources was synthesised into practical requirements for developing effective feedback in healthcare. Both action and information feedback mechanisms were identified, serving safety awareness, improvement and motivational functions. The provision of actionable feedback that visibly improved systems was highlighted as important in promoting future reporting. Fifteen requirements for the design of effective feedback systems were identified, concerning: the role of leadership, the credibility and content of information, effective dissemination channels, the capacity for rapid action and the need for feedback at all levels of the organisation, among others. Above all, the safety-feedback cycle must be closed by ensuring that reporting, analysis and

  3. Haptic feedback for enhancing realism of walking simulations.

    Science.gov (United States)

    Turchet, Luca; Burelli, Paolo; Serafin, Stefania

    2013-01-01

    In this paper, we describe several experiments whose goal is to evaluate the role of plantar vibrotactile feedback in enhancing the realism of walking experiences in multimodal virtual environments. To achieve this goal we built an interactive and a noninteractive multimodal feedback system. While during the use of the interactive system subjects physically walked, during the use of the noninteractive system the locomotion was simulated while subjects were sitting on a chair. In both the configurations subjects were exposed to auditory and audio-visual stimuli presented with and without the haptic feedback. Results of the experiments provide a clear preference toward the simulations enhanced with haptic feedback showing that the haptic channel can lead to more realistic experiences in both interactive and noninteractive configurations. The majority of subjects clearly appreciated the added feedback. However, some subjects found the added feedback unpleasant. This might be due, on one hand, to the limits of the haptic simulation and, on the other hand, to the different individual desire to be involved in the simulations. Our findings can be applied to the context of physical navigation in multimodal virtual environments as well as to enhance the user experience of watching a movie or playing a video game.

  4. Transverse feedback: high intensity operation, AGC, IGC, lessons for 2012

    CERN Document Server

    Höfle, W

    2012-01-01

    The transverse damper system (ADT) plays an important role in the preservation of the beam transverse emittance and for damping of oscillations driven by the coupled bunch instability. An overview of the ADT system will be presented with an emphasis on the important feedback loop parameters as they change from injection through the ramp into collision. The dedicated setting - up procedure required for the different bunch intensities and bunch spacings will be explained. During the 2011 run the injection and abort gap cleaning became operational at injection energy. Preparations for cleaning at 3.5 TeV as well as batch selective transverse blow - up were completed and preliminarily tested. Plans for 2012 include study and potential improvement of the system impulse response to improve the 'selectivity' of the cleaning and blow - up facility. The ADT also provides bunch - by - bunch observation, which was extensively used during the run and MDs, and will be further upgraded during the next year.

  5. The Wonderland of Operating the ALICE Experiment

    CERN Document Server

    Augustinus, A; Pinazza, O; Rosinský, P; Lechman, M; Jirdén, L; Chochula, P

    2011-01-01

    ALICE is one of the experiments at the Large Hadron Collider (LHC), CERN, Geneva, Switzerland. Composed of 18 sub-detectors each with numerous subsystems that need to be controlled and operated in a safe and efficient way. The Detector Control System (DCS) is the key to this and has been used by detector experts with success during the commissioning of the individual detectors. During the transition from commissioning to operation, more and more tasks were transferred from detector experts to central operators. By the end of the 2010 datataking campaign, the ALICE experiment was run by a small crew of central operators, with only a single controls operator. The transition from expert to non-expert operation constituted a real challenge in terms of tools, documentation and training. A relatively high turnover and diversity in the operator crew that is specific to the HEP experiment environment (as opposed to the more stable operation crews for accelerators) made this challenge even bigger. Thi...

  6. Soil feedback and pathogen activity in Prunus serotina throughout its native range

    Science.gov (United States)

    Kurt O. Reinhart; Alejandro Royo; Wim H. Van der Putten; Keith Clay

    2005-01-01

    1 Oomycete soil pathogens are known to have a negative effect on Prunus serotina seedling establishment and to promote tree diversity in a deciduous forest in Indiana, USA. Here, we investigate whether negative feedbacks operate widely in its native range in eastern USA. 2 In laboratory experiments, soil sterilization was used to test the...

  7. Output Feedback Fractional-Order Nonsingular Terminal Sliding Mode Control of Underwater Remotely Operated Vehicles

    Directory of Open Access Journals (Sweden)

    Yaoyao Wang

    2014-01-01

    Full Text Available For the 4-DOF (degrees of freedom trajectory tracking control problem of underwater remotely operated vehicles (ROVs in the presence of model uncertainties and external disturbances, a novel output feedback fractional-order nonsingular terminal sliding mode control (FO-NTSMC technique is introduced in light of the equivalent output injection sliding mode observer (SMO and TSMC principle and fractional calculus technology. The equivalent output injection SMO is applied to reconstruct the full states in finite time. Meanwhile, the FO-NTSMC algorithm, based on a new proposed fractional-order switching manifold, is designed to stabilize the tracking error to equilibrium points in finite time. The corresponding stability analysis of the closed-loop system is presented using the fractional-order version of the Lyapunov stability theory. Comparative numerical simulation results are presented and analyzed to demonstrate the effectiveness of the proposed method. Finally, it is noteworthy that the proposed output feedback FO-NTSMC technique can be used to control a broad range of nonlinear second-order dynamical systems in finite time.

  8. Operational experience with the new LEIR digital low-level RF System

    CERN Document Server

    Angoletta, ME

    2010-01-01

    The LEIR Low-Level (LLRF) system is the first all-digital low LLRF system that has been put into operation in a CERN circular machine. It is a very compact system, composed of one VME64x crate and of few NIM modules. System capabilities include typical beam control tasks, such as frequency program, beam phase, radial and extraction synchronization feedback loops, as well as cavity voltage/phase feedback loops. The system is also capable of coping with the large variation of the revolution frequency during an acceleration cycle as well as with the high dynamic range required by the LEIR cavities operation. Extensive diagnostics and observation capabilities are built-in and the system’s control parameters are fully configurable remotely and in-between cycles. Over the various LEIR runs, the LLRF system has proven to be reliable and reproducible as well as extremely flexible and powerful. These characteristics are essential for a LLRF system and LEIR is already profiting from them. Moreover, high beam availabi...

  9. Continuous-wave dual-wavelength operation of a distributed feedback laser diode with an external cavity using a volume Bragg grating

    Science.gov (United States)

    Zheng, Yujin; Sekine, Takashi; Kurita, Takashi; Kato, Yoshinori; Kawashima, Toshiyuki

    2018-03-01

    We demonstrate continuous-wave dual-wavelength operation of a broad-area distributed feedback (DFB) laser diode with a single external-cavity configuration. This high-power DFB laser has a narrow bandwidth (current and temperature ranges.

  10. Operating experience feedback report -- Pressure locking and thermal binding of gate valves

    International Nuclear Information System (INIS)

    Hsu, C.

    1993-03-01

    The potential for valve inoperability caused by pressure locking and thermal binding has been known for many years in the nuclear industry. Pressure locking or thermal binding is a common-mode failure mechanism that can prevent a gate valve from opening, and could render redundant trains of safety systems or multiple safety systems inoperable. In spite of numerous generic communications issued in the past by the Nuclear Regulatory Commission (NRC) and industry, pressure locking and thermal binding continues to occur to gate valves installed in safety-related systems of both boding water reactors (BWRs) and pressurized water reactors (PWRs). The generic communications to date have not led to effective industry action to fully identify, evaluate, and correct the problem. This report provides a review of operating events involving these failure mechanisms. As a result of this review this report: (1) identifies conditions when the failure mechanisms have occurred, (2) identifies the spectrum of safety systems that have been subjected to the failure mechanisms, and (3) identifies conditions that may introduce the failure mechanisms under both normal and accident conditions. On the basis of the evaluation of the operating events, the Office for Analysis and Evaluation of Operational Data (AEOD) of the NRC concludes that the binding problems with gate valves are an important safety issue that needs priority NRC and industry attention. This report also provides AEOD's recommendation for actions to effectively prevent the occurrence of valve binding failures

  11. Assessing the engagement, learning, and overall experience of students operating an atomic absorption spectrophotometer with remote access technology.

    Science.gov (United States)

    Erasmus, Daniel J; Brewer, Sharon E; Cinel, Bruno

    2015-01-01

    The use of internet-based technologies in the teaching of laboratories has emerged as a promising education tool. This study evaluated the effectiveness of using remote access technology to operate an atomic absorption spectrophotometer in analyzing the iron content in a crude myoglobin extract. Sixty-two students were surveyed on their level of engagement, learning, and overall experience. Feedback from students suggests that the use of remote access technology is effective in teaching students the principles of chemical analysis by atomic absorption spectroscopy. © 2014 The International Union of Biochemistry and Molecular Biology.

  12. MOX and UOX PWR fuel performances EDF operating experience

    International Nuclear Information System (INIS)

    Provost, Jean-Luc; Debes, Michel

    2005-01-01

    Based on a large program of experimentations implemented during the 90s, the industrial achievement of new FAs designs with increased performances opens up new prospects. The currently UOX fuels used on the 58 EDF PWR units are now authorized up to a maximum FA burn-up of 52 GWd/t with a large experience from 45 to 50 GWd/t. Today, the new products, along with the progress made in the field of calculation methods, still enable to increase further the fuel performances with respect to the safety margins. Thus, the conditions are met to implement in the next years new fuel managements on each NPPs series of the EDF fleet with increased enrichment (up to 4.5%) and irradiation limits (up to 62 GWd/t). The recycling of plutonium is part of EDF's reprocessing/recycling strategy. Up to now, 20 PWR 900 MW reactors are managed in MOX hybrid management. The feedback experience of 18 years of PWR operation with MOX is satisfactory, without any specific problem regarding manoeuvrability or plant availability. EDF is now looking to introduce MOX fuels with a higher plutonium content (up to 8.6%) equivalent to natural uranium enriched to 3.7%. It is the goal of the MOX Parity core management which achieve balance of MOX and UOX fuel performance with a significant increase of the MOX average discharge burn-up (BU max: 52 GWd/t for MOX and UOX). The industrial maturity of new FAs designs, with increased performances, allows the implementation in the next years of new fuel managements on each NPPs series of the EDF fleet. The scheduling of the implementation of the new fuel managements on the PWRs fleet is a great challenge for EDF, with important stakes: the nuclear KWh cost decrease with the improvement of the plant operation performance. (author)

  13. Reducing Operating Room Costs Through Real-Time Cost Information Feedback: A Pilot Study.

    Science.gov (United States)

    Tabib, Christian H; Bahler, Clinton D; Hardacker, Thomas J; Ball, Kevin M; Sundaram, Chandru P

    2015-08-01

    To create a protocol for providing real-time operating room (OR) cost feedback to surgeons. We hypothesize that this protocol will reduce costs in a responsible way without sacrificing quality of care. All OR costs were obtained and recorded for robot-assisted partial nephrectomy and laparoscopic donor nephrectomy. Before the beginning of this project, costs pertaining to the 20 most recent cases were analyzed. Items were identified from previous cases as modifiable for replacement or omission. Timely feedback of total OR costs and cost of each item used was provided to the surgeon after each case, and costs were analyzed. A cost analysis of the robot-assisted partial nephrectomy before the washout period indicates expenditures of $5243.04 per case. Ten recommended modifiable items were found to have an average per case cost of $1229.33 representing 23.4% of the total cost. A postwashout period cost analysis found the total OR cost decreased by $899.67 (17.2%) because of changes directly related to the modifiable items. Therefore, 73.2% of the possible identified savings was realized. The same stepwise approach was applied to laparoscopic donor nephrectomies. The average total cost per case before the washout period was $3530.05 with $457.54 attributed to modifiable items. After the washout period, modifiable items costs were reduced by $289.73 (8.0%). No complications occurred in the donor nephrectomy cases while one postoperative complication occurred in the partial nephrectomy group. Providing surgeons with feedback related to OR costs may lead to a change in surgeon behavior and decreased overall costs. Further studies are needed to show equivalence in patient outcomes.

  14. Feedback type as a moderator of the relationship between achievement goals and feedback reactions

    NARCIS (Netherlands)

    Anseel, Frederik; Van Yperen, Nico W.; Janssen, Onne; Duyck, Wouter

    2011-01-01

    The aim of the current study is to shed new light on the inconsistent relationship between performance-approach (PAp) goals and feedback reactions by examining feedback type as a moderator. Results of a field experiment (N = 939) using a web-based work simulation task showed that the effect of

  15. Feedback control of resistive instabilities

    International Nuclear Information System (INIS)

    White, R.B.; Rutherford, P.H.; Furth, H.P.; Park, W.; Liu Chen

    1986-01-01

    Resistive instabilities are responsible for much of the global behavior and the determination of the possible domains of operation of Tokamaks. Their successful control could have definite advantages, even making available new regimes of operation. Elimination of sawtoothing might allow operation with higher currents and more peaked current profiles, with q on axis well below unity. In this work different feedback schemes are explored. Simple analytical derivations of the effects of local heating and current drive feedback are presented. Although control of modes with m ≥ 2 is fairly straighforward, the control of the m = 1 mode is more difficult because of its proximity to ideal instability. The most promising scheme utilizes high energy trapped particles

  16. Feedback of experience as a contribution to safety - an operator's duty

    International Nuclear Information System (INIS)

    Micklinghoff, M.; Pamme, H.; Raetzke, C.

    2007-01-01

    Exchanges of information about events and reliability problems make important contributions to nuclear power plant safety. In an article in the last but one issue of atw, journalist Timm Kraegenow proposed that the operators of nuclear power plants model their attitude towards this subject, and their flows of information, on the example of civil aviation. In particular, vendors should be made the nodes of information exchange. However, in-depth comparison shows that the two areas, civil aviation and nuclear power, have fundamentally different structures. The safety of aircraft designs continues to be the vendor's responsibility throughout the service life of that aircraft, and it is the vendor who holds the type certification. When a deficit becomes apparent, the vendor is the partner to be contacted by the competent authority, and it is the vendor's duty to elaborate solutions. In the case of nuclear power plants, however, responsibility for safety after plant commissioning rests with the operator, i.e. the licensee. The licensee initiates improvements in safety and is also the addressee of instructions by the authorities. This fundamental difference in responsibility for safety is in the nature of things. It is bound to affect also exchanges of information as a module of safety. Although comparison with civil aviation is interesting, it becomes apparent in the end that the way in which flows of information are designed cannot be transferred to the nuclear sector. (orig.)

  17. Operating experience in reprocessing

    International Nuclear Information System (INIS)

    Schueller, W.

    1983-01-01

    Since 1953, reprocessing has accumulated 180 years of operating experience in ten plants, six of them with 41 years of operation in reprocessing oxide fuel from light water reactors. After abortive, premature attempts at what is called commercial reprocessing, which had been oriented towards the market value of recoverable uranium and plutonium, non-military reprocessing technologies have proved their technical feasibility, since 1966 on a pilot scale and since 1976 on an industrial scale. Reprocessing experience obtained on uranium metal fuel with low and medium burnups can now certainly be extrapolated to oxide fuel with high burnup and from pilot plants to industrial scale plants using the same technologies. The perspectives of waste management of the nuclear power plants operated in the Federal Republic of Germany should be viewed realistically. The technical problems still to be solved are in a balanced relationship to the benefit arising to the national economy out of nuclear power generation and can be solved in time, provided there are clearcut political boundary conditions. (orig.) [de

  18. Personalization of immediate feedback to learning styles

    NARCIS (Netherlands)

    Vasilyeva, E.; Pechenizkiy, M.; Gavrilova, T.; Puuronen, S.; Spector, J.M.; Sampson, D.G.; Okamoto, T.; Cerri, S.A.; Ueno, M.; Kashihara, A.

    2007-01-01

    Feedback provided to a user is an important part of learning and interaction in e-learning systems. In this paper we present the results of our pilot experiment aimed to study interrelation between several types of immediate feedback presentation and learning styles (LSs) of users. In the experiment

  19. Stability of Switched Feedback Time-Varying Dynamic Systems Based on the Properties of the Gap Metric for Operators

    Directory of Open Access Journals (Sweden)

    M. De la Sen

    2012-01-01

    Full Text Available The stabilization of dynamic switched control systems is focused on and based on an operator-based formulation. It is assumed that the controlled object and the controller are described by sequences of closed operator pairs (L,C on a Hilbert space H of the input and output spaces and it is related to the existence of the inverse of the resulting input-output operator being admissible and bounded. The technical mechanism addressed to get the results is the appropriate use of the fact that closed operators being sufficiently close to bounded operators, in terms of the gap metric, are also bounded. That philosophy is followed for the operators describing the input-output relations in switched feedback control systems so as to guarantee the closed-loop stabilization.

  20. Vandellos 1 NPP decommissioning feedback experience

    International Nuclear Information System (INIS)

    Fernandez, Rodriguez A.

    2003-01-01

    The Vandellos 1 Nuclear Power Plant (CNV1) is located on the Mediterranean coast in the province of Tarragona (Spain). The Plant is of the European Natural Uranium Graphite-Gas type. The thermal power of the plant amounts to 1,670 MWt, its electrical output being 500 Mwe. The Plant started-up commercial service in May 1972; its final shutdown, due to a fire in the turbines, occurred in October 1989, after 17 years of operation with an accumulated energy production of 55,647 GWh. The option of decommissioning accepted by the Ministry of Industry, consists of first removing the spent fuel and conditioning the operating radioactive wastes, and then undertaking dismantling of almost all the structures and components located outside the reactor vessel, except those ensuring confinement of the vessel itself and the safety and surveillance of the facility and site. No action will be taken with respect to the vessel, in which the reactor will remain confined without nuclear fuel and with its internal components intact until completion of the waiting (dormancy) period. The site itself will be kept under surveillance during dormancy phase, following partial clearance, the remaining installations being left within the new site perimeter in a situation of monitored confinement. Following the dormancy period, which will last some 30 years, total dismantling of the remaining installations will be undertaken, this implying subsequent complete clearance of the site. The project was started in November of 1992, and the works on site began in 1998. The safe enclosure consists only in the reactor pressure vessel, which will be left on site. The activity content of the vessel is about 100 000 Ci, mostly Co 60. Part of the Stage 2 concept is the total static isolation of this vessel. The vessel has 1 700 penetrations, the pipes of which were cut, seal-welded and inspected. After five years of works in Vandellos 1 NPP decommissioning, ENRESA has an experience and knowledge, that is

  1. Perioperative feedback in surgical training: A systematic review.

    Science.gov (United States)

    McKendy, Katherine M; Watanabe, Yusuke; Lee, Lawrence; Bilgic, Elif; Enani, Ghada; Feldman, Liane S; Fried, Gerald M; Vassiliou, Melina C

    2017-07-01

    Changes in surgical training have raised concerns about residents' operative exposure and preparedness for independent practice. One way of addressing this concern is by optimizing teaching and feedback in the operating room (OR). The objective of this study was to perform a systematic review on perioperative teaching and feedback. A systematic literature search identified articles from 1994 to 2014 that addressed teaching, feedback, guidance, or debriefing in the perioperative period. Data was extracted according to ENTREQ guidelines, and a qualitative analysis was performed. Thematic analysis of the 26 included studies identified four major topics. Observation of teaching behaviors in the OR described current teaching practices. Identification of effective teaching strategies analyzed teaching behaviors, differentiating positive and negative teaching strategies. Perceptions of teaching behaviors described resident and attending satisfaction with teaching in the OR. Finally models for delivering structured feedback cited examples of feedback strategies and measured their effectiveness. This study provides an overview of perioperative teaching and feedback for surgical trainees and identifies a need for improved quality and quantity of structured feedback. Copyright © 2016 Elsevier Inc. All rights reserved.

  2. Negative plant-phyllosphere feedbacks in native Asteraceae hosts - a novel extension of the plant-soil feedback framework.

    Science.gov (United States)

    Whitaker, Briana K; Bauer, Jonathan T; Bever, James D; Clay, Keith

    2017-08-01

    Over the past 25 years, the plant-soil feedback (PSF) framework has catalyzed our understanding of how belowground microbiota impact plant fitness and species coexistence. Here, we apply a novel extension of this framework to microbiota associated with aboveground tissues, termed 'plant-phyllosphere feedback (PPFs)'. In parallel greenhouse experiments, rhizosphere and phyllosphere microbiota of con- and heterospecific hosts from four species were independently manipulated. In a third experiment, we tested the combined effects of soil and phyllosphere feedback under field conditions. We found that three of four species experienced weak negative PSF whereas, in contrast, all four species experienced strong negative PPFs. Field-based feedback estimates were highly negative for all four species, though variable in magnitude. Our results suggest that phyllosphere microbiota, like rhizosphere microbiota, can potentially mediate plant species coexistence via negative feedbacks. Extension of the PSF framework to the phyllosphere is needed to more fully elucidate plant-microbiota interactions. © 2017 John Wiley & Sons Ltd/CNRS.

  3. Artificial proprioceptive feedback for myoelectric control.

    Science.gov (United States)

    Pistohl, Tobias; Joshi, Deepak; Ganesh, Gowrishankar; Jackson, Andrew; Nazarpour, Kianoush

    2015-05-01

    The typical control of myoelectric interfaces, whether in laboratory settings or real-life prosthetic applications, largely relies on visual feedback because proprioceptive signals from the controlling muscles are either not available or very noisy. We conducted a set of experiments to test whether artificial proprioceptive feedback, delivered noninvasively to another limb, can improve control of a two-dimensional myoelectrically-controlled computer interface. In these experiments, participants were required to reach a target with a visual cursor that was controlled by electromyogram signals recorded from muscles of the left hand, while they were provided with an additional proprioceptive feedback on their right arm by moving it with a robotic manipulandum. Provision of additional artificial proprioceptive feedback improved the angular accuracy of their movements when compared to using visual feedback alone but did not increase the overall accuracy quantified with the average distance between the cursor and the target. The advantages conferred by proprioception were present only when the proprioceptive feedback had similar orientation to the visual feedback in the task space and not when it was mirrored, demonstrating the importance of congruency in feedback modalities for multi-sensory integration. Our results reveal the ability of the human motor system to learn new inter-limb sensory-motor associations; the motor system can utilize task-related sensory feedback, even when it is available on a limb distinct from the one being actuated. In addition, the proposed task structure provides a flexible test paradigm by which the effectiveness of various sensory feedback and multi-sensory integration for myoelectric prosthesis control can be evaluated.

  4. Effects of galvanic skin response feedback on user experience in gaze-controlled gaming: A pilot study.

    Science.gov (United States)

    Larradet, Fanny; Barresi, Giacinto; Mattos, Leonardo S

    2017-07-01

    Eye-tracking (ET) is one of the most intuitive solutions for enabling people with severe motor impairments to control devices. Nevertheless, even such an effective assistive solution can detrimentally affect user experience during demanding tasks because of, for instance, the user's mental workload - using gaze-based controls for an extensive period of time can generate fatigue and cause frustration. Thus, it is necessary to design novel solutions for ET contexts able to improve the user experience, with particular attention to its aspects related to workload. In this paper, a pilot study evaluates the effects of a relaxation biofeedback system on the user experience in the context of a gaze-controlled task that is mentally and temporally demanding: ET-based gaming. Different aspects of the subjects' experience were investigated under two conditions of a gaze-controlled game. In the Biofeedback group (BF), the user triggered a command by means of voluntary relaxation, monitored through Galvanic Skin Response (GSR) and represented by visual feedback. In the No Biofeedback group (NBF), the same feedback was timed according to the average frequency of commands in BF. After the experiment, each subject filled out a user experience questionnaire. The results showed a general appreciation for BF, with a significant between-group difference in the perceived session time duration, with the latter being shorter for subjects in BF than for the ones in NBF. This result implies a lower mental workload for BF than for NBF subjects. Other results point toward a potential role of user's engagement in the improvement of user experience in BF. Such an effect highlights the value of relaxation biofeedback for improving the user experience in a demanding gaze-controlled task.

  5. Research of the master-slave robot surgical system with the function of force feedback.

    Science.gov (United States)

    Shi, Yunyong; Zhou, Chaozheng; Xie, Le; Chen, Yongjun; Jiang, Jun; Zhang, Zhenfeng; Deng, Ze

    2017-12-01

    Surgical robots lack force feedback, which may lead to operation errors. In order to improve surgical outcomes, this research developed a new master-slave surgical robot, which was designed with an integrated force sensor. The new structure designed for the master-slave robot employs a force feedback mechanism. A six-dimensional force sensor was mounted on the tip of the slave robot's actuator. Sliding model control was adopted to control the slave robot. According to the movement of the master system manipulated by the surgeon, the slave's movement and the force feedback function were validated. The motion was completed, the standard deviation was calculated, and the force data were detected. Hence, force feedback was realized in the experiment. The surgical robot can help surgeons to complete trajectory motions with haptic sensation. Copyright © 2017 John Wiley & Sons, Ltd.

  6. Social closeness and feedback modulate susceptibility to the framing effect

    Science.gov (United States)

    Sip, Kamila E.; Smith, David V.; Porcelli, Anthony J.; Kar, Kohitij; Delgado, Mauricio R.

    2014-01-01

    Although, we often seek social feedback from others to help us make decisions, little is known about how social feedback affects decisions under risk, particularly from a close peer. We conducted two experiments using an established framing task to probe how decision making is modulated by social feedback valence (positive, negative) and the level of closeness with feedback provider (friend, confederate). Participants faced mathematically equivalent decisions framed as either an opportunity to keep (gain frame) or lose (loss frame) part of an initial endowment. Periodically, participants were provided with positive (e.g., “Nice!”) or negative (e.g., “Lame!”) feedback about their choices. Such feedback was provided by either a confederate (Experiment 1), or a gender-matched close friend (Experiment 2). As expected, the framing effect was observed in both experiments. Critically, an individual’s susceptibility to the framing effect was modulated by the valence of the social feedback, but only when the feedback provider was a close friend. This effect was reflected in the activation patterns of ventromedial prefrontal cortex and posterior cingulate cortex, regions involved in complex decision making. Taken together, these results highlight social closeness as an important factor in understanding the impact of social feedback on neural mechanisms of decision making. PMID:25074501

  7. Kayenta advanced series compensation operational experience

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-01

    The world's first three-phase, thyristor-controlled series compensation scheme with continuously variable impedance has been introduced into a transmission system. Energized and dedicated in September 1992, the installation was placed into commercial operation in January 1993 and has provided over one year of operating experience. This paper describes the 230 kV, 330 MVAr (60 Hz) advanced series compensation (ASC) project, located in north-eastern Arizona at Kayenta Substation on the 320 km Glen Canyon-Shiprock transmission line. The paper describes operating experiences, coordination with phase shifting transformer, phase shifter failure, platform power, system disturbances, and future plans.

  8. Development of the Operational Events Groups Ranking Tool

    International Nuclear Information System (INIS)

    Simic, Zdenko; Banov, Reni

    2014-01-01

    Both because of complexity and ageing, facilities like nuclear power plants require feedback from the operating experience in order to further improve safety and operation performance. That is the reason why significant effort is dedicated to operating experience feedback. This paper contains description of the specification and development of the application for the operating events ranking software tool. Robust and consistent way of selecting most important events for detail investigation is important because it is not feasible or even useful to investigate all of them. Development of the tool is based on the comprehensive events characterisation and methodical prioritization. This includes rich set of events parameters which allow their top level preliminary analysis, different ways of groupings and even to evaluate uncertainty propagation to the ranking results. One distinct feature of the implemented method is that user (i.e., expert) could determine how important is particular ranking parameter based on their pairwise comparison. For tools demonstration and usability it is crucial that sample database is also created. For useful analysis the whole set of events for 5 years is selected and characterised. Based on the preliminary results this tool seems valuable for new preliminary prospective on data as whole, and especially for the identification of events groups which should have priority in the more detailed assessment. The results are consisting of different informative views on the events groups importance and related sensitivity and uncertainty results. This presents valuable tool for improving overall picture about specific operating experience and also for helping identify the most important events groups for further assessment. It is clear that completeness and consistency of the input data characterisation is very important to get full and valuable importance ranking. Method and tool development described in this paper is part of continuous effort of

  9. Changing Teacher Morale: An Experiment in Feedback of Identified Problems of Teachers and Principals. Final Report.

    Science.gov (United States)

    Bentley, Ralph R.; Rempel, Averno M.

    This 2-year study attempted to determine whether feedback to teachers and principals about problems and tensions existing in their schools can be effective in changing morale for (1) teachers generally, (2) vocational teachers, (3) and nonvocational teachers. Relationships between teacher morale and such factors as age, sex, teaching experience,…

  10. TSTA Piping and Flame Arrestor Operating Experience Data

    Energy Technology Data Exchange (ETDEWEB)

    Cadwallader, Lee C.; Willms, R. Scott

    2014-10-01

    The Tritium Systems Test Assembly (TSTA) was a facility dedicated to tritium handling technology and experiment research at the Los Alamos National Laboratory. The facility operated from 1984 to 2001, running a prototype fusion fuel processing loop with ~100 grams of tritium as well as small experiments. There have been several operating experience reports written on this facility’s operation and maintenance experience. This paper describes analysis of two additional components from TSTA, small diameter gas piping that handled small amounts of tritium in a nitrogen carrier gas, and the flame arrestor used in this piping system. The operating experiences and the component failure rates for these components are discussed in this paper. Comparison data from other applications are also presented.

  11. Feedback systems in the SLC

    International Nuclear Information System (INIS)

    Thompson, K.A.; Jobe, R.K.; Johnson, R.; Phinney, N.

    1987-02-01

    Two classes of computer-controlled feedback have been implemented to stabilize parameters in subsystems of the SLC: (1) ''slow'' (time scales ∼ minutes) feedback, and (2) ''fast'', i.e., pulse-to-pulse, feedback. The slow loops run in a single FEEDBACK process in the SLC host VAX, which acquires signals and sets control parameters via communication with the database and the network of normal SLC microprocessors. Slow loops exist to stabilize beam energy and energy spread, beam position and angle, and timing of kicker magnets, and to compensate for changes in the phase length of the rf drive line. The fast loops run in dedicated microprocessors, and may sample and/or feedback on particular parameters as often as every pulse of the SLC beam. The first implementations of fast feedback are to control transverse beam blow-up and to stabilize the energy and energy spread of bunches going into the SLC arcs. The overall architecture of the feedback software and the operator interface for controlling loops are discussed

  12. Feedback control of resistive instabilities

    International Nuclear Information System (INIS)

    White, R.B.; Rutherford, P.H.; Furth, H.P.; Park, W.; Chen, L.

    1985-12-01

    Resistive instabilities are responsible for much of the global behavior and the determination of the possible domains of operation of tokamaks. Their successful control could have definite advantages, even making available new regimes of operation. Elimination of sawtoothing might allow operation with higher currents and more peaked current profiles, with q on axis well below unity. In this work different feedback schemes are explored. Simple analytical derivations of the effects of local heating and current drive feedback are presented. Although control of modes with m greater than or equal to 2 is fairly straightforward, the control of the m = 1 mode is more difficult because of its proximity to ideal instability. The most promising scheme utilizes high energy trapped particles. 20 refs., 3 figs

  13. The Effect of Information Feedback in Construction Bidding

    Directory of Open Access Journals (Sweden)

    Alexander Soo

    2010-07-01

    Full Text Available  With the goal to achieve efficiency in bidding competitions, many codes of bidding procedure recommend clients provide contractors with bidding feedback information. Contractors strive to bid competitively via learning based on their experiences in past bidding attempts. The level of bidding feedback information, however, varies across clients. In many cases, clients do not provide feedback or provide insufficient feedback to contractors. Focussing on two information feedback conditions (full and partial, we examine: (i the changes in bidding trend over time, and (ii the effects of bidding feedback information on bidders’ competitiveness in bidding. Data were gathered using a bidding experiment that involved student (inexperienced bidders with a construction project management background. The results show that the variations in bids over time for full information feedback condition are statistically significant, but not for bids from bidders with partial bidding feedback information. Bidders with full bidding feedback information are more competitive than those with partial bidding feedback information. The findings add to both our theoretical and empirical understanding of construction bidding: an understanding of the process of changes in the price of building work, and how the process can be manipulated through the release of bidding feedback information.

  14. Ontario Hydro CANDU operating experience

    International Nuclear Information System (INIS)

    Bartholomew, R.W.; Woodhead, L.W.; Horton, E.P.; Nichols, M.J.; Daly, I.N.

    1987-01-01

    The CANDU Pressurized Heavy Water (CANDU-PHW) type of nuclear-electric generating station has been developed jointly by Atomic Energy of Canada Limited and Ontario Hydro. This report highlights Ontario Hydro's operating experience using the CANDU-PHW system, with a focus on worker and public safety, operating performance and costs, and reliability of system components

  15. Operational experience with superconducting synchrotron magnets

    International Nuclear Information System (INIS)

    Martin, P.S.

    1987-01-01

    The operational experience with the Fermilab Tevatron is presented, with emphasis on reliability and failure modes. Comparisons are made between the operating efficiencies for the superconducting machine and for the conventional Main Ring

  16. Operational experience with superconducting synchrotron magnets

    International Nuclear Information System (INIS)

    Martin, P.S.

    1987-03-01

    The operational experience with the Fermilab Tevatron is presented, with emphasis on reliability and failure modes. Comprisons are made between the operating efficiencies for the superconducting machine and for he conventional Main Ring

  17. LFSC - Linac Feedback Simulation Code

    Energy Technology Data Exchange (ETDEWEB)

    Ivanov, Valentin; /Fermilab

    2008-05-01

    The computer program LFSC (Feedback Simulation Code>) is a numerical tool for simulation beam based feedback in high performance linacs. The code LFSC is based on the earlier version developed by a collective of authors at SLAC (L.Hendrickson, R. McEwen, T. Himel, H. Shoaee, S. Shah, P. Emma, P. Schultz) during 1990-2005. That code was successively used in simulation of SLC, TESLA, CLIC and NLC projects. It can simulate as pulse-to-pulse feedback on timescale corresponding to 5-100 Hz, as slower feedbacks, operating in the 0.1-1 Hz range in the Main Linac and Beam Delivery System. The code LFSC is running under Matlab for MS Windows operating system. It contains about 30,000 lines of source code in more than 260 subroutines. The code uses the LIAR ('Linear Accelerator Research code') for particle tracking under ground motion and technical noise perturbations. It uses the Guinea Pig code to simulate the luminosity performance. A set of input files includes the lattice description (XSIF format), and plane text files with numerical parameters, wake fields, ground motion data etc. The Matlab environment provides a flexible system for graphical output.

  18. Evaluation of new control rooms by operator performance analysis

    International Nuclear Information System (INIS)

    Mori, M; Tomizawa, T.; Tai, I.; Monta, K.; Yoshimura, S.; Hattori, Y.

    1987-01-01

    An advanced supervisory and control system called PODIA TM (Plant Operation by Displayed Information and Automation) was developed by Toshiba. Since this system utilizes computer driven CRTs as a main device for information transfer to operators, thorough system integration tests were performed at the factory and evaluations were made of operators' assessment from the initial experience of the system. The PODIA system is currently installed at two BWR power plants. Based on the experiences from the development of PODIA, a more advanced man-machine interface, Advanced-PODIA (A-PODIA), is developed. A-PODIA enhances the capabilities of PODIA in automation, diagnosis, operational guidance and information display. A-PODIA has been validated by carrying out systematic experiments with a full-scope simulator developed for the validation. The results of the experiments have been analyzed by the method of operator performance analysis and applied to further improvement of the A-PODIA system. As a feedback from actual operational experience, operator performance data in simulator training is an important source of information to evaluate human factors of a control room. To facilitate analysis of operator performance, a performance evaluation system has been developed by applying AI techniques. The knowledge contained in the performance evaluation system was elicited from operator training experts and represented as rules. The rules were implemented by employing an object-oriented paradigm to facilitate knowledge management. In conclusion, it is stated that the feedback from new control room operation can be obtained at an early stage by validation tests and also continuously by comprehensive evaluation (with the help of automated tools) of operator performance in simulator training. The results of operator performance analysis can be utilized for improvement of system design as well as operator training. (author)

  19. Does the Color of Feedback Affect Investment Decisions?

    OpenAIRE

    Tal Shavit; Mosi Rosenboim; Chen Cohen

    2013-01-01

    This paper presents a multi-period experiment that extends a classic experiment on investment allocation preferences by adding colors to the feedback returned to participants. The results show that investors allocate the same proportion of their investment to the stock and the bond funds without regard to the colors. However, red feedback activates an avoidance motivation (vs. an approach motivation), and this reduces chasing past returns. The authors also found that the color of the feedback...

  20. The Effects of Training, Feedback, and Participant Involvement in Behavioral Safety Observations on Office Ergonomic Behavior

    Science.gov (United States)

    Sasson, Joseph R.; Austin, John

    2005-01-01

    Eleven computer terminal operators participated in an experiment that assessed effects of several interventions aimed at increasing safe ergonomic performance. All participants received ergonomics training and performance feedback while six of them collected observations of safe behavior among the remaining five participants. Effects of…

  1. Experimental evaluation of magnified haptic feedback for robot-assisted needle insertion and palpation.

    Science.gov (United States)

    Meli, Leonardo; Pacchierotti, Claudio; Prattichizzo, Domenico

    2017-12-01

    Haptic feedback has been proven to play a key role in enhancing the performance of teleoperated medical procedures. However, due to safety issues, commercially-available medical robots do not currently provide the clinician with haptic feedback. This work presents the experimental evaluation of a teleoperation system for robot-assisted medical procedures able to provide magnified haptic feedback to the clinician. Forces registered at the operating table are magnified and provided to the clinician through a 7-DoF haptic interface. The same interface is also used to control the motion of a 6-DoF slave robotic manipulator. The safety of the system is guaranteed by a time-domain passivity-based control algorithm. Two experiments were carried out on stiffness discrimination (during palpation and needle insertion) and one experiment on needle guidance. Our haptic-enabled teleoperation system improved the performance with respect to direct hand interaction of 80%, 306%, and 27% in stiffness discrimination through palpation, stiffness discrimination during needle insertion, and guidance, respectively. Copyright © 2017 John Wiley & Sons, Ltd.

  2. Operating experience insights supporting ageing assessments

    International Nuclear Information System (INIS)

    Nitoi, M.

    2013-01-01

    Be effective in ageing management means looking at the right aspects, with the right techniques, and one of the most effective tool which could be used for that purpose is the analysis of operating experience. The paper has as objective to perform a review of available operating experience, with the aim to provide a better picture about the impact of ageing effects. The IAEA International Reporting System and NRC Licensee Event Reports were chosen as reference databases, both databases being internationally recognized as important sources of information about events occurrences in the nuclear power plants. The ageing related events identified in the selected time window were analyzed in detail, and the contributions of each major degradation mechanisms that have induced the ageing related events (specific to each defined group of components) was represented and discussed. The paper demonstrates the possibility to use operating experience insights in highlighting the ageing effects. (authors)

  3. Interface Prostheses With Classifier-Feedback-Based User Training.

    Science.gov (United States)

    Fang, Yinfeng; Zhou, Dalin; Li, Kairu; Liu, Honghai

    2017-11-01

    It is evident that user training significantly affects performance of pattern-recognition-based myoelectric prosthetic device control. Despite plausible classification accuracy on offline datasets, online accuracy usually suffers from the changes in physiological conditions and electrode displacement. The user ability in generating consistent electromyographic (EMG) patterns can be enhanced via proper user training strategies in order to improve online performance. This study proposes a clustering-feedback strategy that provides real-time feedback to users by means of a visualized online EMG signal input as well as the centroids of the training samples, whose dimensionality is reduced to minimal number by dimension reduction. Clustering feedback provides a criterion that guides users to adjust motion gestures and muscle contraction forces intentionally. The experiment results have demonstrated that hand motion recognition accuracy increases steadily along the progress of the clustering-feedback-based user training, while conventional classifier-feedback methods, i.e., label feedback, hardly achieve any improvement. The result concludes that the use of proper classifier feedback can accelerate the process of user training, and implies prosperous future for the amputees with limited or no experience in pattern-recognition-based prosthetic device manipulation.It is evident that user training significantly affects performance of pattern-recognition-based myoelectric prosthetic device control. Despite plausible classification accuracy on offline datasets, online accuracy usually suffers from the changes in physiological conditions and electrode displacement. The user ability in generating consistent electromyographic (EMG) patterns can be enhanced via proper user training strategies in order to improve online performance. This study proposes a clustering-feedback strategy that provides real-time feedback to users by means of a visualized online EMG signal input as well

  4. Feedback in Clinical Education, Part II: Approved Clinical Instructor and Student Perceptions of and Influences on Feedback

    Science.gov (United States)

    Nottingham, Sara; Henning, Jolene

    2014-01-01

    Context: Approved Clinical Instructors (ACIs; now known as preceptors) are expected to provide feedback to athletic training students (ATSs) during clinical education experiences. Researchers in other fields have found that clinical instructors and students often have different perceptions of actual and ideal feedback and that several factors may influence the feedback exchanges between instructors and students. However, understanding of these issues in athletic training education is minimal. Objective: To investigate the current characteristics and perceptions of and the influences on feedback exchanges between ATSs and ACIs. Design: Qualitative study. Setting: One entry-level master's degree program accredited by the Commission on Accreditation of Athletic Training Education. Patients or Other Participants: Four ACIs and 4 second-year ATSs. Data Collection and Analysis: Individual, semistructured interviews were conducted with participants and integrated with field notes and observations for analysis. We used the constant comparative approach to inductively analyze data and develop codes and categories. Member checking, triangulation, and peer debriefing were used to promote trustworthiness of the study. Results: Participants described that feedback plays an important role in clinical education and has several purposes related to improving performance. The ACIs and ATSs also discussed several preferred characteristics of feedback. Participants identified 4 main influences on their feedback exchanges, including the ACI, the ATS, personalities, and the learning environment. Conclusions: The ACIs and ATSs had similar perceptions of ideal feedback in addition to the actual feedback that was provided during their clinical education experiences. Most of the preferences for feedback were aligned with recommendations in the literature, suggesting that existing research findings are applicable to athletic training clinical education. Several factors influenced the

  5. Real-time data acquisition and feedback control using Linux Intel computers

    International Nuclear Information System (INIS)

    Penaflor, B.G.; Ferron, J.R.; Piglowski, D.A.; Johnson, R.D.; Walker, M.L.

    2006-01-01

    This paper describes the experiences of the DIII-D programming staff in adapting Linux based Intel computing hardware for use in real-time data acquisition and feedback control systems. Due to the highly dynamic and unstable nature of magnetically confined plasmas in tokamak fusion experiments, real-time data acquisition and feedback control systems are in routine use with all major tokamaks. At DIII-D, plasmas are created and sustained using a real-time application known as the digital plasma control system (PCS). During each experiment, the PCS periodically samples data from hundreds of diagnostic signals and provides these data to control algorithms implemented in software. These algorithms compute the necessary commands to send to various actuators that affect plasma performance. The PCS consists of a group of rack mounted Intel Xeon computer systems running an in-house customized version of the Linux operating system tailored specifically to meet the real-time performance needs of the plasma experiments. This paper provides a more detailed description of the real-time computing hardware and custom developed software, including recent work to utilize dual Intel Xeon equipped computers within the PCS

  6. Ontario Hydro CANDU operating experience

    International Nuclear Information System (INIS)

    Jackson, H.A.; Woodhead, L.W.; Fanjoy, G.R.

    1984-03-01

    The CANDU Pressurized Heavy Water (CANDU-PHW) type of nuclear-electric generating station has been developed jointly by Atomic Energy of Canada Limited and Ontario Hydro. This report highlights Ontario Hydro's operating experience using the CANDU-PHW system, with a focus on the operating performance and costs, reliability of system components and nuclear safety considerations for the workers and the public

  7. Lessons learned from operating experience, maintenance procedures and training measures

    International Nuclear Information System (INIS)

    Guttner, K.; Gronau, D.

    2003-01-01

    Training programmes for nuclear facility personnel as a result of the developing phase of SAT have to be approved in the subsequent implementation and evaluation phases with the consequence of several feedback activities in the whole training process. The effectiveness of this procedure has to be evaluated especially with respect to an improvement of safety culture, shorter outage times or better plant performance, resulting in a smaller number of incidents due to human failures. The first two arguments are directly connected with all types of maintenance work in a nuclear power plant and the related preparatory training measures. The reduction of incidents due to human failures is the result of different influences, i.e. training of the operational as well as of the maintenance personnel together with changes of the operating procedures or system design. Though an evaluation of the training process should always be based on a clear definition of criteria by which the fulfilment of the learning objectives can be measured directly, the real effectiveness of training is proven by the behaviour and attitude of the personnel which can only be taken from indirect indicators. This is discussed in more detail for some examples being partly related to the above mentioned arguments. An excellent plant performance, representing a general objective of all activities, can be analysed by the changed number and reasons of incidents in a plant during its operation time. Two further examples are taken from the reactor service field where there is a tendency to reduce the individual dose rates by changed devices and/or procedures as an output from training experience with mockups. Finally the rationalisation of refresher training for operational personnel by the use of interactive teaching programs (Computer Based Training - CBT) is presented which integrate learning objectives together with a test module. (author)

  8. Operating experience and TPA: the Italian perspective

    International Nuclear Information System (INIS)

    Grimaldi, G.

    1990-01-01

    Collection and analysis of operating experience from the Italian plants and utilization of abroad data both to plants in operation and in construction are presented. Some results are also referred, aimed to evidence the role of the international cooperation to safe operation of nuclear plants. The approach to the Trend and Pattern analyses is described as well, and the use of computerized techniques of analysis on personal computer. Finally on going activities are introduced, specifically application of operating experience of plants in operation to small sized reactors and to ones with more intrinsic safety characteristics; review of the reporting system for future application and comparative analysis of the different realization of selected safety systems

  9. Experience feedback from incidents: methodological and cultural aspects

    International Nuclear Information System (INIS)

    Perinet, R.

    2007-01-01

    EdF has designed some provisions to improve the reliability of human interventions: an increased number of training simulators, management of the quality of interventions, implementation of human factor consultants on each site, improvement in user documentation, development of communication practices, etc. However, despite efforts made in the right direction, the complexity of human behaviour and organisations make it obligatory to follow up the efficacy of these provisions over time in order to ensure that they produce the expected results on work practices. The in-depth analysis by IRSN of events that are significant for safety shows that experience feedback from incidents constitutes a real opportunity to ensure this follow-up. It also highlights the difficulty for licensees to define the temporal context of investigations to carry out, analysing errors committed more in depth and identifying ensuing problems. This article shows that these difficulties are the result of inappropriate methodologies and a lack of skills and availability to carry out the analysis. Finally, it shows that the incident leads to defensive behaviour among those participating in the system that blocks the compilation of information and limits the relevance of analyses. (author)

  10. Enhancing audiovisual experience with haptic feedback: a survey on HAV.

    Science.gov (United States)

    Danieau, F; Lecuyer, A; Guillotel, P; Fleureau, J; Mollet, N; Christie, M

    2013-01-01

    Haptic technology has been widely employed in applications ranging from teleoperation and medical simulation to art and design, including entertainment, flight simulation, and virtual reality. Today there is a growing interest among researchers in integrating haptic feedback into audiovisual systems. A new medium emerges from this effort: haptic-audiovisual (HAV) content. This paper presents the techniques, formalisms, and key results pertinent to this medium. We first review the three main stages of the HAV workflow: the production, distribution, and rendering of haptic effects. We then highlight the pressing necessity for evaluation techniques in this context and discuss the key challenges in the field. By building on existing technologies and tackling the specific challenges of the enhancement of audiovisual experience with haptics, we believe the field presents exciting research perspectives whose financial and societal stakes are significant.

  11. Modernization of electrical systems in NPP Kozloduy unit 5 and 6. Feedback of experience

    International Nuclear Information System (INIS)

    Stinshoff, H.

    2005-01-01

    In the frame of the modernization program for the nuclear power plant Kozloduy unit 5 and 6 Framatome ANP has implemented measures to increase the safety and availability of the electrical systems. The hardware installation is scheduled in the refueling outages of the years 2003 to 2005. In this paper the following items are presented: 1) an overview of the modernization measures; 2) some important technical features of the new equipment and diagnostic measures; 3) feedback of experience

  12. FTAP: a Linux-based program for tapping and music experiments.

    Science.gov (United States)

    Finney, S A

    2001-02-01

    This paper describes FTAP, a flexible data collection system for tapping and music experiments. FTAP runs on standard PC hardware with the Linux operating system and can process input keystrokes and auditory output with reliable millisecond resolution. It uses standard MIDI devices for input and output and is particularly flexible in the area of auditory feedback manipulation. FTAP can run a wide variety of experiments, including synchronization/continuation tasks (Wing & Kristofferson, 1973), synchronization tasks combined with delayed auditory feedback (Aschersleben & Prinz, 1997), continuation tasks with isolated feedback perturbations (Wing, 1977), and complex alterations of feedback in music performance (Finney, 1997). Such experiments have often been implemented with custom hardware and software systems, but with FTAP they can be specified by a simple ASCII text parameter file. FTAP is available at no cost in source-code form.

  13. FFTF operational experience

    International Nuclear Information System (INIS)

    Newland, D.J.; Krupar, J.J.

    1984-01-01

    In April 1982, the FFTF began its first nominally 100 day irradiation cycle. Since that time the plant has operated very well with steadily increasing plant capacity factors during its first four cycles. One hundred fifty fuel assemblies (eighty of which are experiments) and over 32,000 individual fuel pins have been irradiated, some in excess of 100 MWd/Kg burnup. Specialized equipment and systems unique to sodium cooled reactor plants have performed well

  14. Steam generator operating experience update, 1982-1983

    International Nuclear Information System (INIS)

    Frank, L.

    1984-06-01

    This report is a continuation of earlier reports by the staff addressing pressurized water reactor steam generator operating experience. NUREG-0886, Steam Generator Tube Experience, published in February 1982 summarized experience in domestic and foreign plants through December 1981. This report summarizes steam generator operating experience in domestic plants for the years 1982 and 1983. Included are new problems encountered with secondary-side loose parts, sulfur-induced stress-assisted corrosion cracking, and flow-induced vibrational wear in the new preheater design steam generators. The status of Unresolved Safety Issues A3, A4, and A5 is also discussed

  15. Operating experience feedback report: Service water system failures and degradations: Volume 3

    International Nuclear Information System (INIS)

    Lam, P.; Leeds, E.

    1988-11-01

    A comprehensive review and evaluation of service water system failures and degradations observed in operating events in light water reactors from 1980 to 1987 has been conducted. The review and evaluation focused on the identification of causes of system failures and degradations, the adequacy of corrective actions implemented and planned, and the safety significance of the operating events. The results of this review and evaluation indicate that the service water system failures and degradations have significant safety implications. These system failures and degradations are attributable to a great variety of causes, and have adverse impact on a large number of safety-related systems and components which are required to mitigate reactor accidents. Specifically, the causes of failures and degradations include various fouling mechanisms (sediment deposition, biofouling, corrosion and erosion, pipe coating failure, calcium carbonate, foreign material and debris intrusion); single failures and other design deficiencies; flooding; multiple equipment failures; personnel and procedural errors; and seismic deficiencies. Systems and components adversely impacted by a service water system failure or degradation include the component cooling water system, emergency diesel generators, emergency core cooling system pumps and heat exchangers, the residual heat removal system, containment spray and fan coolers, control room chillers, and reactor building cooling units. 44 refs., 10 figs., 5 tabs

  16. Impact of LMFBR operating experience on PFBR design

    International Nuclear Information System (INIS)

    Bhoje, S.B.; Chetal, S.C.; Chellapandi, P.; Govindarajan, S.; Lee, S.M.; Kameswara Rao, A.S.L.; Prabhakar, R.; Raghupathy, S.; Sodhi, B.S.; Sundaramoorthy, T.R.; Vaidyanathan, G.

    2000-01-01

    PFBR is a 500 MWe, sodium cooled, pool type, fast breeder reactor currently under detailed design. It is essential to reduce the capital cost of PFBR in order to make it competitive with thermal reactors. Operating experience of LMFBRs provides a vital input towards simplification of the design, improving its reliability, enhancing safety and achieving overall cost reduction. This paper includes a summary of LMFBR operating experience and details the design features of PFBR as influenced by operating experience of LMFBRs. (author)

  17. Using the Context of User Feedback in Recommender Systems

    Directory of Open Access Journals (Sweden)

    Ladislav Peska

    2016-12-01

    Full Text Available Our work is generally focused on recommending for small or medium-sized e-commerce portals, where explicit feedback is absent and thus the usage of implicit feedback is necessary. Nonetheless, for some implicit feedback features, the presentation context may be of high importance. In this paper, we present a model of relevant contextual features affecting user feedback, propose methods leveraging those features, publish a dataset of real e-commerce users containing multiple user feedback indicators as well as its context and finally present results of purchase prediction and recommendation experiments. Off-line experiments with real users of a Czech travel agency website corroborated the importance of leveraging presentation context in both purchase prediction and recommendation tasks.

  18. Control of conducting polymer actuators without physical feedback: simulated feedback control approach with particle swarm optimization

    International Nuclear Information System (INIS)

    Xiang, Xingcan; Mutlu, Rahim; Alici, Gursel; Li, Weihua

    2014-01-01

    Conducting polymer actuators have shown significant potential in articulating micro instruments, manipulation devices, and robotics. However, implementing a feedback control strategy to enhance their positioning ability and accuracy in any application requires a feedback sensor, which is extremely large in size compared to the size of the actuators. Therefore, this paper proposes a new sensorless control scheme without the use of a position feedback sensor. With the help of the system identification technique and particle swarm optimization, the control scheme, which we call the simulated feedback control system, showed a satisfactory command tracking performance for the conducting polymer actuator’s step and dynamic displacement responses, especially under a disturbance, without needing a physical feedback loop, but using a simulated feedback loop. The primary contribution of this study is to propose and experimentally evaluate the simulated feedback control scheme for a class of the conducting polymer actuators known as tri-layer polymer actuators, which can operate both in dry and wet media. This control approach can also be extended to other smart actuators or systems, for which the feedback control based on external sensing is impractical. (paper)

  19. Emergency planning and operating experience

    International Nuclear Information System (INIS)

    Halpern, O.; Breniere, J.

    1984-01-01

    The purpose of this paper is to derive lessons from operating experience for the planning of emergency measures. This operating experience has two facets: it is obtained not only from the various incidents and accidents which have occurred in countries with nuclear power programmes and from the resulting application of emergency plans but also from the different exercises and simulations carried out in France and in other countries. Experience generally confirms the main approaches selected for emergency plans. The lessons to be derived are of three types: first, it appears necessary to set forth precisely the responsibilities of each person involved in order to prevent a watering-down of decisions in the event of an accident; secondly, considerable improvements need to be made in the different communication networks to be used; and thirdly, small accidents with minor radiological consequences deserve as systematic and thorough an approach as large and more improbable accidents. (author)

  20. Operating practical experience at Argentina

    International Nuclear Information System (INIS)

    Quihillalt, Oscar

    1997-01-01

    Operating experiences of Atucha-1 and Embalse Nuclear Power Plants were discussed in this work. The technical and economic aspects, such as reliability, availability, personnel training, operating costs, prices and market, which exercise influence upon Argentina nuclear energy policy, mainly on the power electric generation by nuclear power plants were considered. Finally the current status of the nucleoelectric sector in Argentina and forecasting were analysed

  1. Learning from Feedback: Spacing and the Delay-Retention Effect

    Science.gov (United States)

    Smith, Troy A.; Kimball, Daniel R.

    2010-01-01

    Most modern research on the effects of feedback during learning has assumed that feedback is an error correction mechanism. Recent studies of feedback-timing effects have suggested that feedback might also strengthen initially correct responses. In an experiment involving cued recall of trivia facts, we directly tested several theories of…

  2. RF feedback simulation results for PEP-II

    International Nuclear Information System (INIS)

    Tighe, R.; Corredoura, P.

    1995-06-01

    A model of the RF feedback system for PEP-II has been developed to provide time-domain simulation and frequency-domain analysis of the complete system. The model includes the longitudinal beam dynamics, cavity fundamental resonance, feedback loops, and the nonlinear klystron operating near saturation. Transients from an ion clearing gap and a reference phase modulation from the longitudinal feedback system are also studied. Growth rates are predicted and overall system stability examined

  3. Using voice input and audio feedback to enhance the reality of a virtual experience

    Energy Technology Data Exchange (ETDEWEB)

    Miner, N.E.

    1994-04-01

    Virtual Reality (VR) is a rapidly emerging technology which allows participants to experience a virtual environment through stimulation of the participant`s senses. Intuitive and natural interactions with the virtual world help to create a realistic experience. Typically, a participant is immersed in a virtual environment through the use of a 3-D viewer. Realistic, computer-generated environment models and accurate tracking of a participant`s view are important factors for adding realism to a virtual experience. Stimulating a participant`s sense of sound and providing a natural form of communication for interacting with the virtual world are equally important. This paper discusses the advantages and importance of incorporating voice recognition and audio feedback capabilities into a virtual world experience. Various approaches and levels of complexity are discussed. Examples of the use of voice and sound are presented through the description of a research application developed in the VR laboratory at Sandia National Laboratories.

  4. Accelerator/Experiment Operations - FY 2016

    International Nuclear Information System (INIS)

    Blake, A.; Convery, M.; Geer, S.; Geesaman, D.; Harris, D.; Johnson, D.; Lang, K.; McFarland, K.; Messier, M.; Moore, C. D.; Newhart, D.; Reimer, P. E.; Plunkett, R.; Rominsky, M.; Sanchez, M.; Schmidt, J. J.; Shanahan, P.; Tate, C.; Thomas, J.; Donatella Torretta, Donatella Torretta; Matthew Wetstein, Matthew Wetstein

    2016-01-01

    This Technical Memorandum summarizes the Fermilab accelerator and experiment operations for FY 2016. It is one of a series of annual publications intended to gather information in one place. In this case, the information concerns the FY 2016 NOvA, MINOS+ and MINERvA experiments using the Main Injector Neutrino Beam (NuMI), the MicroBooNE experiment and the activities in the SciBooNE Hall using the Booster Neutrino Beam (BNB), and the SeaQuest experiment, LArIAT experiment and Meson Test Beam activities in the 120 GeV external switchyard beam (SY120). Each section was prepared by the relevant authors, and was then edited for inclusion in this summary.

  5. Accelerator/Experiment Operations - FY 2016

    Energy Technology Data Exchange (ETDEWEB)

    Blake, A. [Argonne National Lab. (ANL), Argonne, IL (United States); Convery, M. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Geer, S. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Geesaman, D. [Argonne National Lab. (ANL), Argonne, IL (United States); Harris, D. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Johnson, D. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Lang, K. [Argonne National Lab. (ANL), Argonne, IL (United States); McFarland, K. [Argonne National Lab. (ANL), Argonne, IL (United States); Messier, M. [Argonne National Lab. (ANL), Argonne, IL (United States); Moore, C. D. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Newhart, D. [Fermilab; Reimer, P. E. [Argonne; Plunkett, R. [Fermilab; Rominsky, M. [Fermilab; Sanchez, M. [Iowa State U.; Schmidt, J. J. [Fermilab; Shanahan, P. [Fermilab; Tate, C. [Fermilab; Thomas, J. [University Coll. London; Donatella Torretta, Donatella Torretta [Fermilab; Matthew Wetstein, Matthew Wetstein [Iowa State University

    2016-10-01

    This Technical Memorandum summarizes the Fermilab accelerator and experiment operations for FY 2016. It is one of a series of annual publications intended to gather information in one place. In this case, the information concerns the FY 2016 NOvA, MINOS+ and MINERvA experiments using the Main Injector Neutrino Beam (NuMI), the MicroBooNE experiment and the activities in the SciBooNE Hall using the Booster Neutrino Beam (BNB), and the SeaQuest experiment, LArIAT experiment and Meson Test Beam activities in the 120 GeV external switchyard beam (SY120). Each section was prepared by the relevant authors, and was then edited for inclusion in this summary.

  6. Commissioning experience from PEP-II HER longitudinal feedback

    International Nuclear Information System (INIS)

    Prabhakar, S.; Teytelman, D.; Fox, J.; Young, A.; Corredoura, P.; Tighe, R.

    1998-06-01

    The DSP-based bunch-by-bunch feedback system installed in the PEP-II HER has been used to damp HOM-induced instabilities at beam currents up to 6-5 mA during commissioning. Beam pseudospectra calcualted from feedback system data indicate the presence of coupled bunch modes that oincide with the 0-M-2 cavity HOM. Bunch current and synchronous phase measurements are also extracted from the data. These measurements reveal the impedance seen by the beam at revolution harmonics. The impedance peak at 3*frev indicates incorrect parking of the idle cavities, and explains the observed instability of mode 3. Bunch synchrotron tunes are calculated from lorentzian fits to the data. Bunch-to-bunch time variation due to the cavity transient is shown to be large enough to result in Landau damping of coupled bunch modes

  7. ABCDEFG IS - the principle of constructive feedback.

    Science.gov (United States)

    Bhattarai, M

    2007-01-01

    Feedback is an integral part of any learning experience. Constructive feedback is a powerful instrument and facilitates the learner's professional and personal development. "ABCDEFG IS", a mnemonic for the principles of constructive feedback, stands for Amount of the information, Benefit of the trainees, Change behaviour, Descriptive language, Environment, Focused, Group check, Interpretation check, and Sharing information. The eight important steps of feedback are: Ensure prior information, Collect data, Make appropriate meeting arrangement, Begin by encouraging self assessment by the trainee, Highlight areas where the trainee is doing well, Give feedback, Handle reaction maintaining the dignity and Plan actions. Communication and reflection also share many of the principles and steps of constructive feedback and giving regular feedback, thus, helps to improve communication and reflection. The feedback provider would be able to provide genuine feedback by following the appropriate steps and principles of constructive feedback and realize how important and rewarding its role is in teaching learning activities.

  8. Haptic seat for fuel economy feedback

    Energy Technology Data Exchange (ETDEWEB)

    Bobbitt, III, John Thomas

    2016-08-30

    A process of providing driver fuel economy feedback is disclosed in which vehicle sensors provide for haptic feedback on fuel usage. Such sensors may include one or more of a speed sensors, global position satellite units, vehicle pitch/roll angle sensors, suspension displacement sensors, longitudinal accelerometer sensors, throttle position in sensors, steering angle sensors, break pressure sensors, and lateral accelerometer sensors. Sensors used singlely or collectively can provide enhanced feedback as to various environmental conditions and operating conditions such that a more accurate assessment of fuel economy information can be provided to the driver.

  9. Progress Towards High-Speed Operation of the Magnetorotational Instability Experiment and Diagnostic Development

    Science.gov (United States)

    Gilson, E. P.; Caspary, K.; Choi, D.; Ebrahimi, F.; Goodman, J.; Ji, H.; Lysandrou, M.; Sloboda, P.; Tabbutt, M.

    2017-10-01

    Estimates and simulations both suggest that the Princeton MRI experiment must operate with inner cylinder rotation rates > 1,500 rpm, corresponding to magnetic Reynolds numbers Rm > 3 , in order for the flow to be unstable to the MRI. Results will be presented demonstrating progress towards high-speed operation while avoiding adverse effects from large dynamic pressure and heat. Recent studies show that conductive end caps increase the magnitude of the saturated MRI signal, enabling easier detection. However, motor control feedback and pneumatically-driven brakes must be used to maintain control when forces arise from the interaction between induced currents in the rotating end caps and the 3,000 G applied magnetic field. The use of Hall probes and strain gauges to measure the azimuthal magnetic field and the torque at the inner cylinder will be discussed. Results from the Spectral Finite Element and Navier Stokes code have been used to better understand the expected shape of the MRI threshold curve with conducting end caps, the nature of the forces on the end caps, and to predict the magnetic fields and torques at the inner cylinder that result from the onset of the MRI.

  10. Stereo camera based virtual cane system with identifiable distance tactile feedback for the blind.

    Science.gov (United States)

    Kim, Donghun; Kim, Kwangtaek; Lee, Sangyoun

    2014-06-13

    In this paper, we propose a new haptic-assisted virtual cane system operated by a simple finger pointing gesture. The system is developed by two stages: development of visual information delivery assistant (VIDA) with a stereo camera and adding a tactile feedback interface with dual actuators for guidance and distance feedbacks. In the first stage, user's pointing finger is automatically detected using color and disparity data from stereo images and then a 3D pointing direction of the finger is estimated with its geometric and textural features. Finally, any object within the estimated pointing trajectory in 3D space is detected and the distance is then estimated in real time. For the second stage, identifiable tactile signals are designed through a series of identification experiments, and an identifiable tactile feedback interface is developed and integrated into the VIDA system. Our approach differs in that navigation guidance is provided by a simple finger pointing gesture and tactile distance feedbacks are perfectly identifiable to the blind.

  11. MIT January Operational Internship Experience 2011

    Science.gov (United States)

    DeLatte, Danielle; Furhmann, Adam; Habib, Manal; Joujon-Roche, Cecily; Opara, Nnaemeka; Pasterski, Sabrina Gonzalez; Powell, Christina; Wimmer, Andrew

    2011-01-01

    This slide presentation reviews the 2011 January Operational Internship experience (JOIE) program which allows students to study operational aspects of spaceflight, how design affects operations and systems engineering in practice for 3 weeks. Topics include: (1) Systems Engineering (2) NASA Organization (3) Workforce Core Values (4) Human Factors (5) Safety (6) Lean Engineering (7) NASA Now (8) Press, Media, and Outreach and (9) Future of Spaceflight.

  12. Safety evaluation by living probabilistic safety assessment. Procedures and applications for planning of operational activities and analysis of operating experience

    International Nuclear Information System (INIS)

    Johanson, Gunnar; Holmberg, J.

    1994-01-01

    Living Probabilistic Safety Assessment (PSA) is a daily safety management system and it is based on a plant-specific PSA and supporting information systems. In the living use of PSA, plant status knowledge is used to represent actual plant safety status in monitoring or follow-up perspective. The PSA model must be able to express the risk at a given time and plant configuration. The process, to update the PSA model to represent the current or planned configuration and to use the model to evaluate and direct the changes in the configuration, is called living PSA programme. The main purposes to develop and increase the usefulness of living PSA are: Long term safety planning: To continue the risk assessment process started with the basic PSA by extending and improving the basic models and data to provide a general risk evaluation tool for analyzing the safety effects of changes in plant design and procedures. Risk planning of operational activities: To support the operational management by providing means for searching optimal operational maintenance and testing strategies from the safety point of view. The results provide support for risk decision making in the short term or in a planning mode. The operational limits and conditions given by technical specifications can be analyzed by evaluating the risk effects of alternative requirements in order to balance the requirements with respect to operational flexibility and plant economy. Risk analysis of operating experience: To provide a general risk evaluation tool for analyzing the safety effects of incidents and plant status changes. The analyses are used to: identify possible high risk situations, rank the occurred events from safety point of view, and get feedback from operational events for the identification of risk contributors. This report describes the methods, models and applications required to continue the process towards a living use of PSA. 19 tabs, 20 figs

  13. Effects of positive electrical feedback in the oscillating Belousov-Zhabotinsky reaction: Experiments and simulations

    International Nuclear Information System (INIS)

    Sriram, K.

    2006-01-01

    This paper describes both the experimental and numerical investigations on the effect of positive electrical feedback in the oscillating Belovsou-Zhabotinsky (BZ) reaction under batch conditions. Positive electrical feedback causes an increase in the amplitude and period of the oscillations with the corresponding increase of the feedback strength. Oregonator model with a positive feedback term suitably incorporated in one of the dynamical variables is used to account for these experimental observations. Further, the effect of positive feedback on the Hopf points are investigated numerically by constructing the bifurcation diagrams. In the absence of feedback, for a particular stoichiometric parameter, the model exhibits both supercritical and subcritical Hopf bifurcations with canard existing near the former Hopf point. In the presence of positive feedback it is observed that (i) both the Hopf points advances, (ii) the distance between the two Hopf points decreases linearly, while the period increases exponentially with the increase of feedback strength near the Hopf points, (iii) only supercritical Hopf point without canard survives for a very strong positive feedback strength and (iv) moderate feedback strength takes the system away from limit cycle to the canard regime. These observations are explained in terms of Field-Koeroes-Noyes mechanism of the Belousov-Zhabotinsky reaction. This may be the first instance where the advancement of Hopf points due to positive feedback is clearly shown

  14. Feedback implementation options and issues for B factory accelerators

    International Nuclear Information System (INIS)

    Fox, J.D.; Briggs, D.; Eisen, N.; Hindi, H.; Hosseini, W.; Oxoby, G.; Linscott, I.; Coiro, O.; Ghigo, A.; Serio, M.; Lambertson, G.; Voelker, F.

    1992-09-01

    The proposed B factory accelerator facilities will require active feedback systems to control multibunch instabilities. These feedback systems must operate in machines with thousands of circulating bunches and with short (2--4 ns) interbunch intervals. The functional requirements for transverse (betatron) and longitudinal (synchrotron) feedback systems are presented. Several possible implementation options are discussed and system requirements developed. Conceptual designs are presented for the PEP II transverse and longitudinal feedback systems

  15. Reciprocal Markov Modeling of Feedback Mechanisms Between Emotion and Dietary Choice Using Experience-Sampling Data.

    Science.gov (United States)

    Lu, Ji; Pan, Junhao; Zhang, Qiang; Dubé, Laurette; Ip, Edward H

    2015-01-01

    With intensively collected longitudinal data, recent advances in the experience-sampling method (ESM) benefit social science empirical research, but also pose important methodological challenges. As traditional statistical models are not generally well equipped to analyze a system of variables that contain feedback loops, this paper proposes the utility of an extended hidden Markov model to model reciprocal the relationship between momentary emotion and eating behavior. This paper revisited an ESM data set (Lu, Huet, & Dube, 2011) that observed 160 participants' food consumption and momentary emotions 6 times per day in 10 days. Focusing on the analyses on feedback loop between mood and meal-healthiness decision, the proposed reciprocal Markov model (RMM) can accommodate both hidden ("general" emotional states: positive vs. negative state) and observed states (meal: healthier, same or less healthy than usual) without presuming independence between observations and smooth trajectories of mood or behavior changes. The results of RMM analyses illustrated the reciprocal chains of meal consumption and mood as well as the effect of contextual factors that moderate the interrelationship between eating and emotion. A simulation experiment that generated data consistent with the empirical study further demonstrated that the procedure is promising in terms of recovering the parameters.

  16. Collaborative Assembly Operation between Two Modular Robots Based on the Optical Position Feedback

    Directory of Open Access Journals (Sweden)

    Liying Su

    2009-01-01

    Full Text Available This paper studies the cooperation between two master-slave modular robots. A cooperative robot system is set up with two modular robots and a dynamic optical meter-Optotrak. With Optotrak, the positions of the end effectors are measured as the optical position feedback, which is used to adjust the robots' end positions. A tri-layered motion controller is designed for the two cooperative robots. The RMRC control method is adopted to adjust the master robot to the desired position. With the kinematics constraints of the two robots including position and pose, joint velocity, and acceleration constraints, the two robots can cooperate well. A bolt and nut assembly experiment is executed to verify the methods.

  17. A memory advantage for past-oriented over future-oriented performance feedback.

    Science.gov (United States)

    Nash, Robert A; Winstone, Naomi E; Gregory, Samantha E A; Papps, Emily

    2018-03-05

    People frequently receive performance feedback that describes how well they achieved in the past, and how they could improve in future. In educational contexts, future-oriented (directive) feedback is often argued to be more valuable to learners than past-oriented (evaluative) feedback; critically, prior research led us to predict that it should also be better remembered. We tested this prediction in six experiments. Subjects read written feedback containing evaluative and directive comments, which supposedly related to essays they had previously written (Experiments 1-2), or to essays another person had written (Experiments 3-6). Subjects then tried to reproduce the feedback from memory after a short delay. In all six experiments, the data strongly revealed the opposite effect to the one we predicted: despite only small differences in wording, evaluative feedback was in fact recalled consistently better than directive feedback. Furthermore, even when adult subjects did recall directive feedback, they frequently misremembered it in an evaluative style. These findings appear at odds with the position that being oriented toward the future is advantageous to memory. They also raise important questions about the possible behavioral effects and generalizability of such biases, in terms of students' academic performance. (PsycINFO Database Record (c) 2018 APA, all rights reserved).

  18. EBR-II: twenty years of operating experience

    International Nuclear Information System (INIS)

    Lentz, G.L.; Buschman, H.W.; Smith, R.N.

    1985-01-01

    Experimental Breeder Reactor No. 2 (EBR-II) is an unmoderated, sodium-cooled reactor with a design power of 62.5 MWt. For the last 20 years EBR-II has operated safely, has demonstrated stable operating characteristics, has shown excellent performance of its sodium components, and has had an excellent plant factor. These years of operating experience provide a valuable resource to the nuclear community for the development and design of future liquid metal fast reactors. This report provides a brief description of the EBR-II plant and its early operating experience, describes some recent problems of interest to the nuclear community, and also mentions some of the significant operating achievements of EBR-II. Finally, a few words and speculations on EBR-II's future are offered. 4 figs., 1 tab

  19. Decommissioning of the nuclear licensed facilities at the Fontenay aux Roses CEA Center; cleanup of nuclear licensed facility 57 and monitoring of operations and operating feedback

    International Nuclear Information System (INIS)

    Estivie, D.; Bohar, M.P.; Jeanjacques, M.; Binet, C.; Bremond, M.P.; Poyau, C.; Mandard, L.; Boissonneau, J.F.; Fouquereau, A.; Pichereau, E.

    2008-01-01

    This is a summary of the program for the decommissioning of all the CEA Licensed Nuclear Facilities in Fontenay aux Roses. The particularity of this center is now it is located in a built-up area. It is presented like example the operations to clean up the equipment of the Nuclear Licensed Facility 57 (NLF 57). Due to the diversity of the research and development work carried out on the reprocessing of spent fuel in it, this installation is emblematic of many of the technical and organizational issues liable to be encountered in the final closure of nuclear facilities. It was developed a method applied to establish the multi-annual budget, monitor the progress of operations and integrate, as work continues, the operating feedback. (author)

  20. Accelerator/Experiment Operations - FY 2015

    Energy Technology Data Exchange (ETDEWEB)

    Czarapata, P. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); et al.

    2015-10-01

    This Technical Memorandum summarizes the Fermilab accelerator and experiment operations for FY 2015. It is one of a series of annual publications intended to gather information in one place. In this case, the information concerns the FY 2015 NOvA, MINOS+ and MINERvA experiments using the Main Injector Neutrino Beam (NuMI), the activities in the SciBooNE Hall using the Booster Neutrino Beam (BNB), and the SeaQuest experiment and Meson Test Beam (MTest) activities in the 120 GeV external Switchyard beam (SY120).

  1. The Effect of Concurrent Visual Feedback on Controlling Swimming Speed

    Directory of Open Access Journals (Sweden)

    Szczepan Stefan

    2016-03-01

    Full Text Available Introduction. Developing the ability to control the speed of swimming is an important part of swimming training. Maintaining a defined constant speed makes it possible for the athlete to swim economically at a low physiological cost. The aim of this study was to determine the effect of concurrent visual feedback transmitted by the Leader device on the control of swimming speed in a single exercise test. Material and methods. The study involved a group of expert swimmers (n = 20. Prior to the experiment, the race time for the 100 m distance was determined for each of the participants. In the experiment, the participants swam the distance of 100 m without feedback and with visual feedback. In both variants, the task of the participants was to swim the test distance in a time as close as possible to the time designated prior to the experiment. In the first version of the experiment (without feedback, the participants swam the test distance without receiving real-time feedback on their swimming speed. In the second version (with visual feedback, the participants followed a beam of light moving across the bottom of the swimming pool, generated by the Leader device. Results. During swimming with visual feedback, the 100 m race time was significantly closer to the time designated. The difference between the pre-determined time and the time obtained was significantly statistically lower during swimming with visual feedback (p = 0.00002. Conclusions. Concurrently transmitting visual feedback to athletes improves their control of swimming speed. The Leader device has proven useful in controlling swimming speed.

  2. Continuous Air Monitor Operating Experience Review

    International Nuclear Information System (INIS)

    Cadwallader, L.C.; Bruyere, S.A.

    2008-01-01

    Continuous air monitors (CAMs) are used to sense radioactive particulates in room air of nuclear facilities. CAMs alert personnel of potential inhalation exposures to radionuclides and can also actuate room ventilation isolation for public and environmental protection. This paper presents the results of a CAM operating experience review of the DOE Occurrence Reporting and Processing System (ORPS) database from the past 18 years. Regulations regarding these monitors are briefly reviewed. CAM location selection and operation are briefly discussed. Operating experiences reported by the U.S. Department of Energy and in other literature sources were reviewed to determine the strengths and weaknesses of these monitors. Power losses, human errors, and mechanical issues cause the majority of failures. The average 'all modes' failure rate is 2.65E-05/hr. Repair time estimates vary from an average repair time of 9 hours (with spare parts on hand) to 252 hours (without spare parts on hand). These data should support the use of CAMs in any nuclear facility, including the National Ignition Facility and the international ITER experiment

  3. Biodynamic feedback training to assure learning partial load bearing on forearm crutches.

    Science.gov (United States)

    Krause, Daniel; Wünnemann, Martin; Erlmann, Andre; Hölzchen, Timo; Mull, Melanie; Olivier, Norbert; Jöllenbeck, Thomas

    2007-07-01

    To examine how biodynamic feedback training affects the learning of prescribed partial load bearing (200N). Three pre-post experiments. Biomechanics laboratory in a German university. A volunteer sample of 98 uninjured subjects who had not used crutches recently. There were 24 subjects in experiment 1 (mean age, 23.2y); 64 in experiment 2 (mean age, 43.6y); and 10 in experiment 3 (mean age, 40.3y), parallelized by arm force. Video instruction and feedback training: In experiment 1, 2 varied instruction videos and reduced feedback frequency; in experiment 2, varied frequencies of changing tasks (contextual interference); and in experiment 3, feedback training (walking) and transfer (stair tasks). Vertical ground reaction force. Absolute error of practiced tasks was significantly reduced for all samples (Pstairs might be beneficial.

  4. Feedback stabilization of plasma instabilities

    International Nuclear Information System (INIS)

    Cap, F.F.

    1977-01-01

    This paper reviews the theoretical and experimental aspects of feedback stabilization. After giving an outline of a general theoretical model for electrostatic instabilities the author provides a theoretical analysis of the suppression of various types of instability. Experiments which have been carried out on the feedback stabilization of various types of plasma instability are reported. An extensive list of references is given. (B.R.H.)

  5. Operating manual for the critical experiments facility

    International Nuclear Information System (INIS)

    1986-01-01

    The operation of the Critical Experiments Facility (CEF) requires careful attention to procedures in order that all safety precautions are observed. Since an accident could release large amounts of radioactivity, careful operation and strict enforcement of procedures are necessary. To provide for safe operation, detailed procedures have been written for all phases of the operation of this facility. The CEF operating procedures are not to be construed to constitute a part ofthe Technical Specifications. In the event of any discrepancy between the information given herein and the Technical Specifications, limits set forth in the Technical Specifications apply. All normal and most emergency operation conditions are covered by procedures presented in this manual. These procedures are designed to be followed by the operating personnel. Strict adherence to these procedures is expected for the following reasons. (1) To provide a standard, safe method of performing all operations, the procedures were written by reactor engineers experienced in supervising the operation of reactors and were reviewed by an organization with over 30 years of reactor operating experience. (2) To have an up-to-date description of operating techniques available at all times for reference and review, it is necessary that the procedures be written

  6. Operating manual for the critical experiments facility

    Energy Technology Data Exchange (ETDEWEB)

    1986-01-01

    The operation of the Critical Experiments Facility (CEF) requires careful attention to procedures in order that all safety precautions are observed. Since an accident could release large amounts of radioactivity, careful operation and strict enforcement of procedures are necessary. To provide for safe operation, detailed procedures have been written for all phases of the operation of this facility. The CEF operating procedures are not to be construed to constitute a part ofthe Technical Specifications. In the event of any discrepancy between the information given herein and the Technical Specifications, limits set forth in the Technical Specifications apply. All normal and most emergency operation conditions are covered by procedures presented in this manual. These procedures are designed to be followed by the operating personnel. Strict adherence to these procedures is expected for the following reasons. (1) To provide a standard, safe method of performing all operations, the procedures were written by reactor engineers experienced in supervising the operation of reactors and were reviewed by an organization with over 30 years of reactor operating experience. (2) To have an up-to-date description of operating techniques available at all times for reference and review, it is necessary that the procedures be written.

  7. Design, construction, and first operational results of a 5 megawatt feedback controlled amplifier system for disruption control on the Columbia University HBT-EP tokamak

    International Nuclear Information System (INIS)

    Reass, W.A.; Alvestad, H.A.; Bartsch, R.R.; Wurden, G.A.; Ivers, T.H.; Nadle, D.L.

    1995-01-01

    This paper presents the electrical design and first operational results of a 5 Megawatt feedback controlled amplifier system designed to drive a 300 uH saddle coil set on the ''HBT-EP'' tokamak. It will be used to develop various plasma feedback techniques to control and inhibit the onset of plasma disruptions that are observed in high ''B'' plasmas. To provide a well characterized system, a high fidelity, high power closed loop amplifier system has been refurbished from the Los Alamos ''ZT-P'' equilibrium feedback system. In it's configuration developed for the Columbia HBT-EP tokamak, any desired waveform may be generated within a I 100 ampere and 16 kV peak to peak dynamic range. An energy storage capacitor bank presently limits the effective full power pulse width to 10 mS. The full power bandwidth driving the saddle coil set is ∼12 kHz, with bandwidth at reduced powers exceeding 30 kHz. The system is designed similar to a grounded cathode, push-pull, transformer coupled, tube type amplifier system. 'Me push pull amplifier consists of 6 each Machlett ML8618 magnetically beamed triodes, 3 on each end of the (center tapped) coupling transformer. The transformer has .I volt-seconds of core and a 1:1 turns ratio. The transformer is specially designed for high power, low leakage inductance, and high bandwidth. Each array of ML8618's is (grid) driven with a fiber optic controlled hotdeck with a 3CXI0,000A7 (triode) output. To linearize the ML8618 grid drive, a minor feedback loop in the hotdeck is utilized. Overall system response is controlled by active feedback of the saddle coil current, derived from a coaxial current viewing resistor. The detailed electrical design of the power amplifier, transformer, and feedback system will be provided in addition to recent HBT-EP operational results

  8. Feedback is good or bad? Medical residents’ points of view on feedback in clinical education

    Directory of Open Access Journals (Sweden)

    LEILA BAZRAFKAN

    2013-04-01

    Full Text Available Introduction: Feedback is very important in education and can help quality in the training process and orient the trainees in clinical contexts. This study aimed to assess the residents’ points of view about feedback in clinical education at Shiraz University of Medical Sciences. Methods: The sample of this study included 170 medical residents attending medical workshops in Shiraz University of Medical Sciences. The residents filled a valid and reliable questionnaire containing 21 items on their perceptions of the feedback they got throughout the workshops. The data were analyzed using SPSS version 14. Results: The study revealed that residents, generally, have a positive perception of feedback in their training. The highest score belonged to the items such as “feedback was applicable to future work”, “feedback corrected my behavior”, “feedback worked as a motivation for education” and “feedback was specific in one subject”. Residents who had a negative feedback experience also increased their efforts to learn. The Surgery residents acquired the highest scores while radiology residents got the lowest. The difference between these groups was statistically significant (P = 0.000. Conclusion: The highest mean score belonged to internal medicine residents. This shows that residents believe that obstetrics & gynecology ward is a ward in which the formative assessment is much more powerful in comparison to the other three major wards. The surgery ward received the lowest score for formative assessment and this shows that the feedback in surgery ward is very low.

  9. Accelerator/Experiment operations - FY 2006

    Energy Technology Data Exchange (ETDEWEB)

    Brice, S.; Conrad, J.; Denisov, D.; Ginther, G.; Holmes, S.; James, C.; Lee, W.; Louis, W.; Moore, C.; Plunkett, R.; Raja, R.; /Fermilab

    2006-10-01

    This Technical Memorandum (TM) summarizes the Fermilab accelerator and experiment operations for FY 2006. It is one of a series of annual publications intended to gather information in one place. In this case, the information concerns the FY 2006 Run II at the Tevatron Collider, the MiniBooNE experiments running in the Booster Neutrino Beam in neutrino and antineutrino modes, MINOS using the Main Injector Neutrino Beam (NuMI), and SY 120 activities.

  10. Novel Reduced-Feedback Wireless Communication Systems

    KAUST Repository

    Shaqfeh, Mohammad Obaidah; Alnuweiri, Hussein; Alouini, Mohamed-Slim

    2011-01-01

    We have recently contributed to this field and published several journal and conference papers. We are the pioneers to propose a novel reduced-feedback opportunistic scheduling scheme that combines many desired features including fairness in resources distribution across the active terminals and distributed processing at the MAC layer level. In addition our scheme operates close to the upper capacity limits of achievable transmission rates over wireless links. We have also proposed another hybrid scheme that enables adjusting the feedback load flexibly based on rates requirements. We are currently investigating other novel ideas to design reduced-feedback communication systems.

  11. Modeling and simulation of Indus-2 RF feedback control system

    International Nuclear Information System (INIS)

    Sharma, D.; Bagduwal, P.S.; Tiwari, N.; Lad, M.; Hannurkar, P.R.

    2012-01-01

    Indus-2 synchrotron radiation source has four RF stations along with their feedback control systems. For higher beam energy and current operation amplitude and phase feedback control systems of Indus-2 are being upgraded. To understand the behaviour of amplitude and phase control loop under different operating conditions, modelling and simulation of RF feedback control system is done. RF cavity baseband I/Q model has been created due to its close correspondence with actual implementation and better computational efficiency which makes the simulation faster. Correspondence between cavity baseband and RF model is confirmed by comparing their simulation results. Low Level RF (LLRF) feedback control system simulation is done using the same cavity baseband I/Q model. Error signals are intentionally generated and response of the closed loop system is observed. Simulation will help us in optimizing parameters of upgraded LLRF system for higher beam energy and current operation. (author)

  12. Feedback in analog circuits

    CERN Document Server

    Ochoa, Agustin

    2016-01-01

    This book describes a consistent and direct methodology to the analysis and design of analog circuits with particular application to circuits containing feedback. The analysis and design of circuits containing feedback is generally presented by either following a series of examples where each circuit is simplified through the use of insight or experience (someone else’s), or a complete nodal-matrix analysis generating lots of algebra. Neither of these approaches leads to gaining insight into the design process easily. The author develops a systematic approach to circuit analysis, the Driving Point Impedance and Signal Flow Graphs (DPI/SFG) method that does not require a-priori insight to the circuit being considered and results in factored analysis supporting the design function. This approach enables designers to account fully for loading and the bi-directional nature of elements both in the feedback path and in the amplifier itself, properties many times assumed negligible and ignored. Feedback circuits a...

  13. Linking ecological science to decision-making: delivering environmental monitoring information as societal feedback.

    Science.gov (United States)

    Vaughan, Hague; Whitelaw, Graham; Craig, Brian; Stewart, Craig

    2003-01-01

    The paper describes the Ecological Monitoring and Assessment Network's (EMAN) operational and program response to certain challenges of environmental monitoring in Canada, in particular, efforts to improve the ability of the network to deliver relevant information to decision makers. In addition to its familiar roles, environmental monitoring should deliver feedback to society on environmental changes associated with development patterns, trends, processes and interventions. In order for such feedback to be effective, it must be relevant, timely, useful and accessible: all characteristics that are defined by the user, not the provider. Demand driven environmental monitoring is explored through EMAN's experiences with Canada's Biosphere Reserves, the NatureWatch Program and the Canadian Community Monitoring Network.

  14. Feedback Control Of Dynamical Instabilities In Classical Lasers And Fels

    CERN Document Server

    Bielawski, S; Szwaj, C

    2005-01-01

    Dynamical instabilities lead to unwanted full-scale power oscillations in many classical lasers and FEL oscillators. For a long time, applications requiring stable operation were typically performed by working outside the problematic parameter regions. A breakthrough occurred in the nineties [1], when emphasis was made on the practical importance of unstable states (stationary or periodic) that coexist with unwanted oscillatory states. Indeed, although not observable in usual experiments, unstable states can be stabilized, using a feedback control involving arbitrarily small perturbations of a parameter. This observation stimulated a set of works leading to successful suppression of dynamical instabilities (initially chaos) in lasers, sometimes with surprisingly simple feedback devices [2]. We will review a set of key results, including in particular the recent works on the stabilization of mode-locked lasers, and of the super-ACO, ELETTRA and UVSOR FELs [3].

  15. Effects of postidentification feedback on eyewitness identification and nonidentification confidence.

    Science.gov (United States)

    Semmler, Carolyn; Brewer, Neil; Wells, Gary L

    2004-04-01

    Two experiments investigated new dimensions of the effect of confirming feedback on eyewitness identification confidence using target-absent and target-present lineups and (previously unused) unbiased witness instructions (i.e., "offender not present" option highlighted). In Experiment 1, participants viewed a crime video and were later asked to try to identify the thief from an 8-person target-absent photo array. Feedback inflated witness confidence for both mistaken identifications and correct lineup rejections. With target-present lineups in Experiment 2, feedback inflated confidence for correct and mistaken identifications and lineup rejections. Although feedback had no influence on the confidence-accuracy correlation, it produced clear overconfidence. Confidence inflation varied with the confidence measure reference point (i.e., retrospective vs. current confidence) and identification response latency.

  16. Incorporating operational experience and design changes in availability forecasts

    International Nuclear Information System (INIS)

    Norman, D.

    1988-01-01

    Reliability or availability forecasts which are based solely on past operating experience will be precise if the sample is large enough, and unbiased if nothing in the future design, environment, operating region or anything else changes. Unfortunately, life is never like that. This paper considers the methodology and philosophy of modifying forecasts based on past experience to take account also of changes in design, construction methods, operating philosophy, environments, operator training and so on, between the plants which provided the operating experience and the plant for which the forecast is being made. This emphasises the importance of collecting, assessing, and learning from past data and of a thorough knowledge of future designs, and procurement, operation, and maintenance policies. The difference between targets and central estimates is also discussed. The paper concludes that improvements in future availability can be made by learning from past experience, but that certain conditions must be fulfilled in order to do so. (author)

  17. BN-600 power unit 15-year operating experience

    International Nuclear Information System (INIS)

    Saraev, O.M.; Oshkanov, N.N.; Vylomov, V.V.

    1996-01-01

    Comprehensive experience has been gained with the operating fast reactor BN-600 with a power out of 600 MWe. This paper includes important performance results and gives also an overview of the experience gained from BN-600 NPP commercial operation during 15 years. (author). 2 figs, 1 tab

  18. Development of bunch by bunch transverse feedback system at Hefei light source

    International Nuclear Information System (INIS)

    Wang Junhua; Zheng Kai; Li Weimin; Yang Yongliang; Huang Longjun; Chen Yuanbo; Zhou Zeran; Wang Lin; Liu Zeping; Sun Baogen; Ma Li; Cao Jianshe; Yue Junhui; Liu Dekang; Ye Kairong

    2008-01-01

    This paper has introduced the development of the transverse bunch-by-bunch measurement and feedback system, including the experiment of damping the coupled bunch instability. Some key technologies on the system have been introduced: the vector calculation module as a signal processing module used to adjust the phase of the feedback signals, the feedback kicker cavity and the notch filter used to filter the DC component and revolution frequencies component in a signal and save the feedback power. The result of the feedback experiment is mentioned: the instability oscillation was damped when the feedback system was on. (authors)

  19. Recent operating experiences and programs at EBR-II

    International Nuclear Information System (INIS)

    Lentz, G.L.

    1984-01-01

    Experimental Breeder Reactor No. II (EBR-II) is a pool-type, unmoderated, sodium-cooled reactor with a design power of 62.5 MWt and an electrical generation capability of 20 MW. It has been operated by Argonne National Laboratory for the US government for almost 20 years. During that time, it has operated safely and has demonstrated stable operating characteristics, high availability, and excellent performance of its sodium components. The 20 years of operating experience of EBR-II is a valuable resource to the nuclear community for the development and design of future LMFBR's. Since past operating experience has been extensively reported, this report will focus on recent programs and events

  20. Feedback control of current drive by using hybrid wave in tokamaks

    International Nuclear Information System (INIS)

    Wijnands, T.J.; CEA Centre d'Etudes de Cadarache, 13 - Saint-Paul-lez-Durance

    1997-03-01

    This work is focussed on an important and recent development in present day Controlled Nuclear Fusion Research and Tokamaks. The aim is to optimise the energy confinement for a certain magnetic configuration by adapting the radial distribution of the current. Of particular interest are feedback control scenarios with stationary modifications of the current profile using current, driven by Lower Hybrid waves. A new feedback control system has been developed for Tore Supra and has made a large number of new operation scenarios possible. In one of the experiments described here, there is no energy exchange between the poloidal field system and the plasma, the current is controlled by the power of the Lower Hybrid waves while the launched wave spectrum is used to optimise the current profile shape and the energy confinement. (author)

  1. Audiotape Feedback for Essays in Distance Education

    NARCIS (Netherlands)

    Kirschner, P.A.; Brink, H. van den; Meester, M.

    1991-01-01

    Students who were required to write three short essays for a university level course on photochemistry at the Open university of the Netherlands received either audio-cassette or written feedback on their essays. The students receiving the audio feedback described their experience as personal,

  2. Providing feedback on emotional experiences and decision making

    NARCIS (Netherlands)

    Machajdik, J.; Stöttinger, J.; Danelova, E.; Pongratz, M.; Kavicky, L.; Valenti, R.; Hanbury, A.

    2011-01-01

    We present a novel lifelog system concept created to provide a human user with feedback on their conscious and unconscious emotional reactions and encourage the process of self-reflection by looking into an affective mirror. The emotion of the user is deduced from biometric data and enhanced by

  3. Operational experience with Dragon reactor experiment of relevance to commercial reactors

    International Nuclear Information System (INIS)

    Capp, P.D.; Simon, R.A.

    1976-01-01

    An important part of the experience gained during the first ten years of successful power operation of the Dragon Reactor is relevant to the design and operation of future High Temperature Reactors (HTRs). The aspects presented in this paper have been chosen as being particularly applicable to larger HTR systems. Core performance under a variety of conditions is surveyed with particular emphasis on a technique developed for the identification and location of unpurged releasing fuel and the presence of activation and fission products in the core area. The lessons learned during the reflector block replacement are presented. Operating experience with the primary circuit identifies the lack of mixing of gas streams within the hot plenum and the problems of gas streaming in ducts. Helium leakage from the circuit is often greater than the optimum 0.1%/d. Virtually all the leakage problems are associated with the small bore instrument pipework essential for the many experiments associated with the Dragon Reactor Experiment (DRE). Primary circuit maintenance work confirms the generally clean state of the DRE circuit but identifies 137 Cs and 110 Agsup(m) as possible hazards if fuel emitting these isotopes is irradiated. (author)

  4. Operational experience of the Marcoule reactors

    International Nuclear Information System (INIS)

    Conte, F.

    1963-01-01

    The results obtaining from three years operation of the reactors G-2, G-3 have made it possible to accumulate a considerable amount of operational experience of these reactors. The main original points: - the pre-stressed concrete casing - the possibility of loading while under power - automatic temperature control have been perfectly justified by the results of operation. The author confirms the importance of these original solutions and draws conclusions concerning the study of future nuclear power stations. (author) [fr

  5. Treatment of operational experience of nuclear power plants in WANO

    International Nuclear Information System (INIS)

    Ibanez, M.

    2013-01-01

    The article describes the activities associated to the Operating Experience Programme of the World Association of Nuclear Operators. The programme manages the event reports submitted by the nuclear power plants to the WANO database for the preparation by the Operating Experience Central Team of some documents like the significant Operating Experience Reports and Significant Event Reports that help the stations to avoid similar events. (Author)

  6. Feedback stabilization of electrostatic reactive instabilities

    International Nuclear Information System (INIS)

    Richards, R.K.

    1976-01-01

    A general theory for the feedback stabilization of electrostatic reactive instabilities is developed which includes the effects of dissipation in the plasma and frequency dependence in the sensor-suppressor elements and in the external feedback circuit. This theory is compared to experiments involving particular reactive instability, an interchange mode, found in a magnetic mirror device; these results are found to be in good agreement with theory. One noteworthy result is that a frequency dependence in the overall gain and phase shift of the feedback loop can cause destabilization at large gain. Multimode feedback stabilization is studied using the spatial variation of two interchange modes to separate them such that each can be acted upon individually by the feedback system. The transfer function of the plasma is also examined. This analysis is used for mode identification and location of the pole positions. As an example of using feedback as a diagnostic tool, instability induced transport is studied. Here feedback is used to control the amplitude of fluctuations at saturation

  7. Operating experience with high beta superconducting RF cavities

    International Nuclear Information System (INIS)

    Dylla, H.F.; Doolittle, L.R.; Benesch, J.F.

    1993-01-01

    The number of installed and operational β=1 superconducting rf cavities has grown significantly over the last two years in accelerator laboratories in Europe, Japan and the U.S. The total installed acceleration capability as of mid-1993 is approximately 1 GeV at nominal gradients. Major installations at CERN, DESY, KEK and CEBAF have provided large increments to the installed base and valuable operational experience. A selection of test data and operational experience gathered to date is reviewed

  8. Operating experience with high beta superconducting rf cavities

    International Nuclear Information System (INIS)

    Dylla, H.F.; Doolittle, L.R.; Benesch, J.F.

    1993-06-01

    The number of installed and operational β = 1 superconducting rf cavities has grown significantly over the last two years in accelerator laboratories in Europe, Japan and the US. The total installed acceleration capability as of mid-1993 is approximately 1 GeV at nominal gradients. Major installations at CERN, DESY, KEK and CEBAF have provided large increments to the installed base and valuable operational experience. A selection of test data and operational experience gathered to date is reviewed

  9. Both movement-end and task-end are critical for error feedback in visuomotor adaptation: a behavioral experiment.

    Directory of Open Access Journals (Sweden)

    Takumi Ishikawa

    Full Text Available An important issue in motor learning/adaptation research is how the brain accepts the error information necessary for maintaining and improving task performance in a changing environment. The present study focuses on the effect of timing of error feedback. Previous research has demonstrated that adaptation to displacement of the visual field by prisms in a manual reaching task is significantly slowed by delayed visual feedback of the endpoint, suggesting that error feedback is most effective when given at the end of a movement. To further elucidate the brain mechanism by which error information is accepted in visuomotor adaptation, we tested whether error acceptance is linked to the end of a given task or to the end of an executed movement. We conducted a behavioral experiment using a virtual shooting task in which subjects controlled their wrist movements to meet a target with a cursor as accurately as possible. We manipulated the timing of visual feedback of the impact position so that it occurred either ahead of or behind the true time of impact. In another condition, the impact timing was explicitly indicated by an additional cue. The magnitude of the aftereffect significantly varied depending on the timing of feedback (p < 0.05, Friedman's Test. Interestingly, two distinct peaks of aftereffect were observed around movement-end and around task-end, irrespective of the existence of the timing cue. However, the peak around task-end was sharper when the timing cue was given. Our results demonstrate that the brain efficiently accepts error information at both movement-end and task-end, suggesting that two different learning mechanisms may underlie visuomotor transformation.

  10. Entering 'A NEW REALM' of KIBO Payload Operations - Continuous efforts for microgravity experiment environment and lessons learned from real time experiment operations in KIBO -

    International Nuclear Information System (INIS)

    Sakagami, K; Goto, M; Matsumoto, S; Ohkuma, H

    2011-01-01

    On January 22nd, 2011(JST), KOUNOTORI2 (H-II Transfer Vehicle: HTV2) was successfully launched from Tanegashima Space Center toward the International Space Station (ISS) and two new JAXA payload racks, Kobairo rack and MSPR (Multi-purpose Small Payload Rack) were transferred to ISS/KIBO (Japanese Experiment Module: JEM). In addition to Saibo rack and Ryutai rack which are already in operation in KIBO, in total 4 Japanese experiment payload racks start operations in KIBO. Then KIBO payload operations embark on a new realm, full utilization phase. While the number and variety of microgravity experiments become increasing, simultaneous operation constraints should be considered to achieve multitask payload operations in ISS/KIBO and ever more complicated cooperative operations between crewmember and flight control team/science team are required. Especially for g-jitter improvement in ISS/KIBO, we have greatly advanced cooperative operations with crewmember in the recent increment based on the microgravity data analysis results. In this paper, newly operating Japanese experiment payloads characteristics and some methods to improve g-jitter environment are introduced from the front line of KIBO payload operations.

  11. Smith-Purcell Distributed Feedback Laser

    CERN Document Server

    Kipnis, D; Gover, A

    2005-01-01

    Smith-Purcell radiation is the emission of electromagnetic radiation by an electron beam passing next to an optical grating. Recently measurement of relatively intense power of such radiation was observed in the THz-regime [1]. To explain the high intensity and the super-linear dependence on current beyond a threshold it was suggested that the radiating device operated in the high gain regime, amplifying spontaneous emission (ASE) [1,2]. We contest this interpretation and suggest an alternative mechanism. According to our interpretation the device operates as a distributed feedback (DFB) laser oscillator, in which a forward going surface wave, excited by the beam on the grating surface, is coupled to a backward going surface wave by a second order Bragg reflection process. This feedback process produces a saturated oscillator. We present theoretical analysis of the proposed process, which fits the reported experimental results, and enables better design of the radiation device, operating as a Smith-Purcell DF...

  12. USA/FBR program status FFTF operations startup experience

    International Nuclear Information System (INIS)

    Moffitt, W.C.; Izatt, R.D.

    1981-06-01

    This paper gives highlights of the major Operations evaluations and operational results of the startup acceptance testing program and initiation of normal operating cycles for experiment irradiation in the FFTF. 33 figures

  13. Nuclear plant operation: achieving excellence through quality

    Energy Technology Data Exchange (ETDEWEB)

    Bergstrom, L [Barseback Nuclear Power Plant (Sweden); Bergeron, J P [Electricite de France (EDF), 75 - Paris (France); Coakley, W [and others

    1992-07-01

    Nuclear power operation is characterised by a very high level of safety and availability resulting in economically competitive electricity production. This achievement must not only be maintained but must be further developed if nuclear power is to regain momentum in the light of its widely recognized environmental advantages. Therefore this meeting bring together all those, managers and technical staff, responsible for the operation of the nuclear in order to allow them to exchange views, experience and knowledge on fundamental aspects such as: management philosophy, quality assurance, human resources and international co-operation; focusing on training (incident analysis and management), human factors and experience feedback; maintenance philosophy, life extension and upgrading, organisation and administration. (A.L.B.)

  14. Nuclear plant operation: achieving excellence through quality

    International Nuclear Information System (INIS)

    Bergstrom, L.; Bergeron, J.P.; Coakley, W.

    1992-01-01

    Nuclear power operation is characterised by a very high level of safety and availability resulting in economically competitive electricity production. This achievement must not only be maintained but must be further developed if nuclear power is to regain momentum in the light of its widely recognized environmental advantages. Therefore this meeting bring together all those, managers and technical staff, responsible for the operation of the nuclear in order to allow them to exchange views, experience and knowledge on fundamental aspects such as: management philosophy, quality assurance, human resources and international co-operation; focusing on training (incident analysis and management), human factors and experience feedback; maintenance philosophy, life extension and upgrading, organisation and administration. (A.L.B.)

  15. Kinesthetic Feedback During 2DOF Wrist Movements via a Novel MR-Compatible Robot.

    Science.gov (United States)

    Erwin, Andrew; O'Malley, Marcia K; Ress, David; Sergi, Fabrizio

    2017-09-01

    We demonstrate the interaction control capabilities of the MR-SoftWrist, a novel MR-compatible robot capable of applying accurate kinesthetic feedback to wrist pointing movements executed during fMRI. The MR-SoftWrist, based on a novel design that combines parallel piezoelectric actuation with compliant force feedback, is capable of delivering 1.5 N [Formula: see text] of torque to the wrist of an interacting subject about the flexion/extension and radial/ulnar deviation axes. The robot workspace, defined by admissible wrist rotation angles, fully includes a circle with a 20 deg radius. Via dynamic characterization, we demonstrate capability for transparent operation with low (10% of maximum torque output) backdrivability torques at nominal speeds. Moreover, we demonstrate a 5.5 Hz stiffness control bandwidth for a 14 dB range of virtual stiffness values, corresponding to 25%-125% of the device's physical reflected stiffness in the nominal configuration. We finally validate the possibility of operation during fMRI via a case study involving one healthy subject. Our validation experiment demonstrates the capability of the device to apply kinesthetic feedback to elicit distinguishable kinetic and neural responses without significant degradation of image quality or task-induced head movements. With this study, we demonstrate the feasibility of MR-compatible devices like the MR-SoftWrist to be used in support of motor control experiments investigating wrist pointing under robot-applied force fields. Such future studies may elucidate fundamental neural mechanisms enabling robot-assisted motor skill learning, which is crucial for robot-aided neurorehabilitation.

  16. Flexible Multi-Bit Feedback Design for HARQ Operation of Large-Size Data Packets in 5G

    DEFF Research Database (Denmark)

    Khosravirad, Saeed; Mudolo, Luke; Pedersen, Klaus I.

    2017-01-01

    large-size data packet thanks to which the transmitter node can reduce the retransmission size to only include the initially failed segments of the packet. We study the effect of feedback size on retransmission efficiency through extensive link-level simulations over realistic channel models. Numerical......A reliable feedback channel is vital to report decoding acknowledgments in retransmission mechanisms such as the hybrid automatic repeat request (HARQ). While the feedback bits are known to be costly for the wireless link, a feedback message more informative than the conventional single......-bit feedback can increase resource utilization efficiency. Considering the practical limitations for increasing feedback message size, this paper proposes a framework for the design of flexible-content multi-bit feedback. The proposed design is capable of efficiently indicating the faulty segments of a failed...

  17. Who wants feedback? An investigation of the variables influencing residents' feedback-seeking behavior in relation to night shifts.

    Science.gov (United States)

    Teunissen, Pim W; Stapel, Diederik A; van der Vleuten, Cees; Scherpbier, Albert; Boor, Klarke; Scheele, Fedde

    2009-07-01

    The literature on feedback in clinical medical education has predominantly treated trainees as passive recipients. Past research has focused on how clinical supervisors can use feedback to improve a trainee's performance. On the basis of research in social and organizational psychology, the authors reconceptualized residents as active seekers of feedback. They investigated what individual and situational variables influence residents' feedback-seeking behavior on night shifts. Early in 2008, the authors sent obstetrics-gynecology residents in the Netherlands--both those in their first two years of graduate training and those gaining experience between undergraduate and graduate training--a questionnaire that assessed four predictor variables (learning and performance goal orientation, and instrumental and supportive leadership), two mediator variables (perceived feedback benefits and costs), and two outcome variables (frequency of feedback inquiry and monitoring). They used structural equation modeling software to test a hypothesized model of relationships between variables. The response rate was 76.5%. Results showed that residents who perceive more feedback benefits report a higher frequency of feedback inquiry and monitoring. More perceived feedback costs result mainly in more feedback monitoring. Residents with a higher learning goal orientation perceive more feedback benefits and fewer costs. Residents with a higher performance goal orientation perceive more feedback costs. Supportive physicians lead residents to perceive more feedback benefits and fewer costs. This study showed that some residents actively seek feedback. Residents' feedback-seeking behavior partially depends on attending physicians' supervisory style. Residents' goal orientations influence their perceptions of the benefits and costs of feedback-seeking.

  18. Collective irrationality and positive feedback.

    Science.gov (United States)

    Nicolis, Stamatios C; Zabzina, Natalia; Latty, Tanya; Sumpter, David J T

    2011-04-26

    Recent experiments on ants and slime moulds have assessed the degree to which they make rational decisions when presented with a number of alternative food sources or shelter. Ants and slime moulds are just two examples of a wide range of species and biological processes that use positive feedback mechanisms to reach decisions. Here we use a generic, experimentally validated model of positive feedback between group members to show that the probability of taking the best of options depends crucially on the strength of feedback. We show how the probability of choosing the best option can be maximized by applying an optimal feedback strength. Importantly, this optimal value depends on the number of options, so that when we change the number of options the preference of the group changes, producing apparent "irrationalities". We thus reinterpret the idea that collectives show "rational" or "irrational" preferences as being a necessary consequence of the use of positive feedback. We argue that positive feedback is a heuristic which often produces fast and accurate group decision-making, but is always susceptible to apparent irrationality when studied under particular experimental conditions.

  19. Collective irrationality and positive feedback.

    Directory of Open Access Journals (Sweden)

    Stamatios C Nicolis

    Full Text Available Recent experiments on ants and slime moulds have assessed the degree to which they make rational decisions when presented with a number of alternative food sources or shelter. Ants and slime moulds are just two examples of a wide range of species and biological processes that use positive feedback mechanisms to reach decisions. Here we use a generic, experimentally validated model of positive feedback between group members to show that the probability of taking the best of options depends crucially on the strength of feedback. We show how the probability of choosing the best option can be maximized by applying an optimal feedback strength. Importantly, this optimal value depends on the number of options, so that when we change the number of options the preference of the group changes, producing apparent "irrationalities". We thus reinterpret the idea that collectives show "rational" or "irrational" preferences as being a necessary consequence of the use of positive feedback. We argue that positive feedback is a heuristic which often produces fast and accurate group decision-making, but is always susceptible to apparent irrationality when studied under particular experimental conditions.

  20. Control of an atom laser using feedback

    International Nuclear Information System (INIS)

    Haine, S.A.; Ferris, A.J.; Close, J.D.; Hope, J.J.

    2004-01-01

    A generalized method of using feedback to control multimode behavior in Bose-Einstein condensates is introduced. We show that for any available control, there is an associated moment of the atomic density and a feedback scheme that will remove energy from the system while there are oscillations in that moment. We demonstrate these schemes by considering a condensate trapped in a harmonic potential that can be modulated in strength and position. The formalism of our feedback scheme also allows the inclusion of certain types of nonlinear controls. If the nonlinear interaction between the atoms can be controlled via a Feshbach resonance, we show that the feedback process can operate with a much higher efficiency

  1. The Stratonovich formulation of quantum feedback network rules

    Science.gov (United States)

    Gough, John E.

    2016-12-01

    We express the rules for forming quantum feedback networks using the Stratonovich form of quantum stochastic calculus rather than the Itō or SLH (J. E. Gough and M. R. James, "Quantum feedback networks: Hamiltonian formulation," Commun. Math. Phys. 287, 1109 (2009), J. E. Gough and M. R. James, "The Series product and its application to quantum feedforward and feedback networks," IEEE Trans. Autom. Control 54, 2530 (2009)) form. Remarkably the feedback reduction rule implies that we obtain the Schur complement of the matrix of Stratonovich coupling operators where we short out the internal input/output coefficients.

  2. Social anxiety and the ironic effects of positive interviewer feedback.

    Science.gov (United States)

    Budnick, Christopher J; Kowal, Marta; Santuzzi, Alecia M

    2015-01-01

    Positive interviewer feedback should encourage positive experiences and outcomes for interviewees. Yet, positive feedback is inconsistent with socially anxious interviewees' negative self-views. Socially anxious interviewees might experience increased self-focus while attempting to reconcile the inconsistency between their self-perceptions and that feedback. This could interfere with successful interview performance. This study used a 3 (feedback: positive, negative, no) × 2 (social anxiety: high, low) between-subjects design. Undergraduate students (N = 88) completed a measure of dispositional social anxiety. They then engaged in a simulated interview with a White confederate trained to adhere to a standardized script. Interviewees received positive, negative, or no interviewer feedback. Each interview was video recorded to code anxiety displays, impression management tactics, and interview success. Following positive feedback, socially anxious interviewees displayed more anxiety, less assertiveness, and received lower success ratings. Among anxious interviewees, increased self-focus provided an indirect path between positive feedback and lower success. Consistent with self-verification theory, anxious interviewees had poorer interview performance following positive feedback that contradicted their negative self-views. Thus, socially anxious interviewees might be at a disadvantage when interviewing, especially following positive feedback. Implications for interviewees and interviewers are discussed.

  3. Comparing the effects of positive and negative feedback in information-integration category learning.

    Science.gov (United States)

    Freedberg, Michael; Glass, Brian; Filoteo, J Vincent; Hazeltine, Eliot; Maddox, W Todd

    2017-01-01

    Categorical learning is dependent on feedback. Here, we compare how positive and negative feedback affect information-integration (II) category learning. Ashby and O'Brien (2007) demonstrated that both positive and negative feedback are required to solve II category problems when feedback was not guaranteed on each trial, and reported no differences between positive-only and negative-only feedback in terms of their effectiveness. We followed up on these findings and conducted 3 experiments in which participants completed 2,400 II categorization trials across three days under 1 of 3 conditions: positive feedback only (PFB), negative feedback only (NFB), or both types of feedback (CP; control partial). An adaptive algorithm controlled the amount of feedback given to each group so that feedback was nearly equated. Using different feedback control procedures, Experiments 1 and 2 demonstrated that participants in the NFB and CP group were able to engage II learning strategies, whereas the PFB group was not. Additionally, the NFB group was able to achieve significantly higher accuracy than the PFB group by Day 3. Experiment 3 revealed that these differences remained even when we equated the information received on feedback trials. Thus, negative feedback appears significantly more effective for learning II category structures. This suggests that the human implicit learning system may be capable of learning in the absence of positive feedback.

  4. Experience on operational safety improvement of control and operation support systems

    International Nuclear Information System (INIS)

    Itoh, N.; Nakagawa, T.; Mano, K.

    1988-01-01

    Japanese nuclear industry started in 1956 and about 30 years have passed since that time. Through these years, we have made a lot of efforts and developments in the field of Control and Instrumentation (C and I) system. The above 30 years and following years can be divided into four major periods. The first one is the period of research, the second of domestic production, the third of improvement, and the fourth of advancement. Improvements of C and I system, which we have made in those periods have made a great contribution to enhancement of reliability, availability and operability of nuclear power plants. Fig. 1 shows TEPCO's nuclear power plant (BWR) construction experience and technical trend of C and I system in Japan. This paper is to introduce the efforts and operational experience on control and operation support systems

  5. Designing new feedback mangement system Långvik

    OpenAIRE

    Dang, Hien

    2014-01-01

    This thesis is a design project on the field of feedback management, conducted for Långvik hotel. The purpose of this thesis is to recommend a new feedback management system for the hotel that can effectively recognize original reasons for customers’ returning decision. The new approach to feedback management is expected to generate a higher number of re- turned customers subsequent to the summer business peak. The literature review focuses on the connection between customer experience and...

  6. Vandellos 1 NPP decommissioning feedback experience

    Energy Technology Data Exchange (ETDEWEB)

    Fernandez, Rodriguez A. [Empresa Nacional de Residuos Radioactivos, ENPRESA, Madrid (Spain)

    2003-07-01

    The Vandellos 1 Nuclear Power Plant (CNV1) is located on the Mediterranean coast in the province of Tarragona (Spain). The Plant is of the European Natural Uranium Graphite-Gas type. The thermal power of the plant amounts to 1,670 MWt, its electrical output being 500 Mwe. The Plant started-up commercial service in May 1972; its final shutdown, due to a fire in the turbines, occurred in October 1989, after 17 years of operation with an accumulated energy production of 55,647 GWh. The option of decommissioning accepted by the Ministry of Industry, consists of first removing the spent fuel and conditioning the operating radioactive wastes, and then undertaking dismantling of almost all the structures and components located outside the reactor vessel, except those ensuring confinement of the vessel itself and the safety and surveillance of the facility and site. No action will be taken with respect to the vessel, in which the reactor will remain confined without nuclear fuel and with its internal components intact until completion of the waiting (dormancy) period. The site itself will be kept under surveillance during dormancy phase, following partial clearance, the remaining installations being left within the new site perimeter in a situation of monitored confinement. Following the dormancy period, which will last some 30 years, total dismantling of the remaining installations will be undertaken, this implying subsequent complete clearance of the site. The project was started in November of 1992, and the works on site began in 1998. The safe enclosure consists only in the reactor pressure vessel, which will be left on site. The activity content of the vessel is about 100 000 Ci, mostly Co 60. Part of the Stage 2 concept is the total static isolation of this vessel. The vessel has 1 700 penetrations, the pipes of which were cut, seal-welded and inspected. After five years of works in Vandellos 1 NPP decommissioning, ENRESA has an experience and knowledge, that is

  7. Investigation, development and application of optimal output feedback theory. Volume 2: Development of an optimal, limited state feedback outer-loop digital flight control system for 3-D terminal area operation

    Science.gov (United States)

    Broussard, J. R.; Halyo, N.

    1984-01-01

    This report contains the development of a digital outer-loop three dimensional radio navigation (3-D RNAV) flight control system for a small commercial jet transport. The outer-loop control system is designed using optimal stochastic limited state feedback techniques. Options investigated using the optimal limited state feedback approach include integrated versus hierarchical control loop designs, 20 samples per second versus 5 samples per second outer-loop operation and alternative Type 1 integration command errors. Command generator tracking techniques used in the digital control design enable the jet transport to automatically track arbitrary curved flight paths generated by waypoints. The performance of the design is demonstrated using detailed nonlinear aircraft simulations in the terminal area, frequency domain multi-input sigma plots, frequency domain single-input Bode plots and closed-loop poles. The response of the system to a severe wind shear during a landing approach is also presented.

  8. Haptic Feedback for Enhancing Realism of Walking Simulations

    DEFF Research Database (Denmark)

    Turchet, Luca; Burelli, Paolo; Serafin, Stefania

    2013-01-01

    system. While during the use of the interactive system subjects physically walked, during the use of the non-interactive system the locomotion was simulated while subjects were sitting on a chair. In both the configurations subjects were exposed to auditory and audio-visual stimuli presented...... with and without the haptic feedback. Results of the experiments provide a clear preference towards the simulations enhanced with haptic feedback showing that the haptic channel can lead to more realistic experiences in both interactive and non-interactive configurations. The majority of subjects clearly...... appreciated the added feedback. However, some subjects found the added feedback disturbing and annoying. This might be due on one hand to the limits of the haptic simulation and on the other hand to the different individual desire to be involved in the simulations. Our findings can be applied to the context...

  9. Follower-Centered Perspective on Feedback: Effects of Feedback Seeking on Identification and Feedback Environment

    OpenAIRE

    Gong, Zhenxing; Li, Miaomiao; Qi, Yaoyuan; Zhang, Na

    2017-01-01

    In the formation mechanism of the feedback environment, the existing research pays attention to external feedback sources and regards individuals as objects passively accepting feedback. Thus, the external source fails to realize the individuals’ need for feedback, and the feedback environment cannot provide them with useful information, leading to a feedback vacuum. The aim of this study is to examine the effect of feedback-seeking by different strategies on the supervisor-feedback environme...

  10. The role of feedback resistors and tid effects in the ASET response of a high speed current feedback amplifier

    International Nuclear Information System (INIS)

    Roig, F.; Dusseau, L.; Privat, A.; Vaille, J.R.; Boch, J.; Saigne, F.; Ribeiro, P.; Auriel, G.; Roche, N.J.H.; Marec, R.; Calvel, P.; Bezerra, F.; Ecoffet, R.; Azais, B.

    2014-01-01

    The influence of external circuit designs on ASET shapes in a high speed current feedback amplifier (CFA) (AD844) is investigated by means of the pulsed laser single event effect (PLSEE) simulation technique. Changes of the feedback resistors modify circuit's electrical parameters such as closed-loop gain and bandwidth, affecting amplifier stability and so ASET shapes. Qualitative explanations based on general electronic rules and feedback theories enable the understanding of a CFA operation establishing a correlation between the evolution of external feedback resistor values and ASET parameters. TID effects on the ASET sensitivity in AD844 CFA are also investigated in this work highlighting different behaviors according to the impacted bipolar transistor in the integrated circuit. (authors)

  11. Stereo Camera Based Virtual Cane System with Identifiable Distance Tactile Feedback for the Blind

    Directory of Open Access Journals (Sweden)

    Donghun Kim

    2014-06-01

    Full Text Available In this paper, we propose a new haptic-assisted virtual cane system operated by a simple finger pointing gesture. The system is developed by two stages: development of visual information delivery assistant (VIDA with a stereo camera and adding a tactile feedback interface with dual actuators for guidance and distance feedbacks. In the first stage, user’s pointing finger is automatically detected using color and disparity data from stereo images and then a 3D pointing direction of the finger is estimated with its geometric and textural features. Finally, any object within the estimated pointing trajectory in 3D space is detected and the distance is then estimated in real time. For the second stage, identifiable tactile signals are designed through a series of identification experiments, and an identifiable tactile feedback interface is developed and integrated into the VIDA system. Our approach differs in that navigation guidance is provided by a simple finger pointing gesture and tactile distance feedbacks are perfectly identifiable to the blind.

  12. LFSC - Linac Feedback Simulation Code

    International Nuclear Information System (INIS)

    Ivanov, Valentin; Fermilab

    2008-01-01

    The computer program LFSC ( ) is a numerical tool for simulation beam based feedback in high performance linacs. The code LFSC is based on the earlier version developed by a collective of authors at SLAC (L.Hendrickson, R. McEwen, T. Himel, H. Shoaee, S. Shah, P. Emma, P. Schultz) during 1990-2005. That code was successively used in simulation of SLC, TESLA, CLIC and NLC projects. It can simulate as pulse-to-pulse feedback on timescale corresponding to 5-100 Hz, as slower feedbacks, operating in the 0.1-1 Hz range in the Main Linac and Beam Delivery System. The code LFSC is running under Matlab for MS Windows operating system. It contains about 30,000 lines of source code in more than 260 subroutines. The code uses the LIAR ('Linear Accelerator Research code') for particle tracking under ground motion and technical noise perturbations. It uses the Guinea Pig code to simulate the luminosity performance. A set of input files includes the lattice description (XSIF format), and plane text files with numerical parameters, wake fields, ground motion data etc. The Matlab environment provides a flexible system for graphical output

  13. DIRECT CORRECTIVE FEEDBACK ON STUDENTS‟WRITING PERFORMANCE

    Directory of Open Access Journals (Sweden)

    Testiana Deni Wijayatiningsih

    2017-04-01

    Full Text Available Teaching writing genre especially recount, narrative, and descriptive need brief and detail correction. Moreover, students aware about their mistakes in writing genre clearly. So, they can revise themselves. Based on the background above, this research aimed to know students‘achievement differences between using direct corrective feedback and indirect corrective feedback. The subject of this research was the fourth semester of English Department of Universitas Muhammadiyah Semarang. It employed quasi experiment and one group pre test post test design to analyze the students‘ writing achievement. The result showed that there is a significant differences between direct corrective feedback and indirect corrective feedback. Hopefully this research gives benefit for lecturers to use direct corrective feedback in their teaching writing process .

  14. Review and updates of the risk assessment for advanced test reactor operations for operating events and experience

    International Nuclear Information System (INIS)

    Atkinson, S.A.

    1996-01-01

    Annual or biannual reviews of the operating history of the Advanced Test Reactor (ATR) at the Idaho National Engineering Laboratory (INEL) have been conducted for the purpose of reviewing and updating the ATR probabilistic safety assessment (PSA) for operating events and operating experience since the first compilation of plant- specific experience data for the ATR PSA which included data for operation from initial power operation in 1969 through 1988. This technical paper briefly discusses the means and some results of these periodic reviews of operating experience and their influence on the ATR PSA

  15. Operational experience with SLAC's beam containment electronics

    International Nuclear Information System (INIS)

    Constant, T.N.; Crook, K.; Heggie, D.

    1977-03-01

    Considerable operating experience was accumulated at SLAC with an extensive electronic system for the containment of high power accelerated beams. Average beam power at SLAC can approach 900 kilowatts with the potential for burning through beam stoppers, protection collimators, and other power absorbers within a few seconds. Fast, reliable, and redundant electronic monitoring circuits have been employed to provide some of the safeguards necessary for minimizing the risk to personnel. The electronic systems are described, and the design philosophy and operating experience are discussed

  16. Concluding from operating experience to instrumentation and control systems

    International Nuclear Information System (INIS)

    Pleger, H.; Heinsohn, H.

    1997-01-01

    Where conclusions are drawn from operating experience to instrumentation and control systems, two general statements should be made. First: There have been braekdowns, there have also been deficiencies, but in principle operating experience with the instrumentation and control systems of German nuclear power plants has been good. With respect to the debates about the use of modern digital instrumentation and control systems it is safe to say, secondly, that the instrumentation and control systems currently in use are working reliably. Hence, there is no need at present to replace existing systems for reasons of technical safety. However, that time will come. It is a good thing, therefore, that the use of modern digital instrumentation and control systems is to begin in the field of limiting devices. The operating experience which will thus be accumulated will benefit digital instrumentation and control systems in their qualification process for more demanding applications. This makes proper logging of operating experience an important function, even if it cannot be transferred in every respect. All parties involved therefore should see to it that this operating experience is collected in accordance with criteria agreed upon so as to prevent unwanted surprises later on. (orig.) [de

  17. [Operating Room Nurses' Experiences of Securing for Patient Safety].

    Science.gov (United States)

    Park, Kwang Ok; Kim, Jong Kyung; Kim, Myoung Sook

    2015-10-01

    This study was done to evaluate the experience of securing patient safety in hospital operating rooms. Experiential data were collected from 15 operating room nurses through in-depth interviews. The main question was "Could you describe your experience with patient safety in the operating room?". Qualitative data from the field and transcribed notes were analyzed using Strauss and Corbin's grounded theory methodology. The core category of experience with patient safety in the operating room was 'trying to maintain principles of patient safety during high-risk surgical procedures'. The participants used two interactional strategies: 'attempt continuous improvement', 'immersion in operation with sharing issues of patient safety'. The results indicate that the important factors for ensuring the safety of patients in the operating room are manpower, education, and a system for patient safety. Successful and safe surgery requires communication, teamwork and recognition of the importance of patient safety by the surgical team.

  18. Fire protection system operating experience review for fusion applications

    International Nuclear Information System (INIS)

    Cadwallader, L.C.

    1995-12-01

    This report presents a review of fire protection system operating experiences from particle accelerator, fusion experiment, and other applications. Safety relevant operating experiences and accident information are discussed. Quantitative order-of-magnitude estimates of fire protection system component failure rates and fire accident initiating event frequencies are presented for use in risk assessment, reliability, and availability studies. Safety concerns with these systems are discussed, including spurious operation. This information should be useful to fusion system designers and safety analysts, such as the team working on the Engineering Design Activities for the International Thermonuclear Experimental Reactor

  19. Fire protection system operating experience review for fusion applications

    Energy Technology Data Exchange (ETDEWEB)

    Cadwallader, L.C.

    1995-12-01

    This report presents a review of fire protection system operating experiences from particle accelerator, fusion experiment, and other applications. Safety relevant operating experiences and accident information are discussed. Quantitative order-of-magnitude estimates of fire protection system component failure rates and fire accident initiating event frequencies are presented for use in risk assessment, reliability, and availability studies. Safety concerns with these systems are discussed, including spurious operation. This information should be useful to fusion system designers and safety analysts, such as the team working on the Engineering Design Activities for the International Thermonuclear Experimental Reactor.

  20. Effect of task-related continuous auditory feedback during learning of tracking motion exercises

    Directory of Open Access Journals (Sweden)

    Rosati Giulio

    2012-10-01

    Full Text Available Abstract Background This paper presents the results of a set of experiments in which we used continuous auditory feedback to augment motor training exercises. This feedback modality is mostly underexploited in current robotic rehabilitation systems, which usually implement only very basic auditory interfaces. Our hypothesis is that properly designed continuous auditory feedback could be used to represent temporal and spatial information that could in turn, improve performance and motor learning. Methods We implemented three different experiments on healthy subjects, who were asked to track a target on a screen by moving an input device (controller with their hand. Different visual and auditory feedback modalities were envisaged. The first experiment investigated whether continuous task-related auditory feedback can help improve performance to a greater extent than error-related audio feedback, or visual feedback alone. In the second experiment we used sensory substitution to compare different types of auditory feedback with equivalent visual feedback, in order to find out whether mapping the same information on a different sensory channel (the visual channel yielded comparable effects with those gained in the first experiment. The final experiment applied a continuously changing visuomotor transformation between the controller and the screen and mapped kinematic information, computed in either coordinate system (controller or video, to the audio channel, in order to investigate which information was more relevant to the user. Results Task-related audio feedback significantly improved performance with respect to visual feedback alone, whilst error-related feedback did not. Secondly, performance in audio tasks was significantly better with respect to the equivalent sensory-substituted visual tasks. Finally, with respect to visual feedback alone, video-task-related sound feedback decreased the tracking error during the learning of a novel

  1. TSTA piping and flame arrestor operating experience data

    Energy Technology Data Exchange (ETDEWEB)

    Cadwallader, Lee C., E-mail: Lee.Cadwallader@inl.gov [Idaho National Laboratory, Idaho Falls, ID (United States); Willms, R. Scott [ITER International Organization, Cadarache (France)

    2015-10-15

    Highlights: • Experiences from the Tritium Systems Test Assembly were examined. • Failure rates of copper piping and a flame arrestor were calculated. • The calculated failure rates compared well to similar data from the literature. • Tritium component failure rate data support fusion safety assessment. - Abstract: The Tritium Systems Test Assembly (TSTA) was a facility dedicated to tritium handling technology and experiment research at the Los Alamos National Laboratory. The facility was operated with tritium for its research and development program from 1984 to 2001, running a prototype fusion fuel processing loop with ∼100 g of tritium as well as small experiments. There have been several operating experience reports written on this facility's operation and maintenance experience. This paper describes reliability analysis of two additional components from TSTA, small diameter copper gas piping that handled tritium in a nitrogen carrier gas, and the flame arrestor used in this piping system. The component failure rates for these components are discussed in this paper. Comparison data from other applications are also presented.

  2. Operator training and the training simulator experience

    International Nuclear Information System (INIS)

    Mills, D.

    The author outlines the approach used by Ontario Hydro to train operators from the day they are hired as Operators-in-Training until they are Authorized Unit First Operators. He describes in detail the use of the simulator in the final year of the authorization program, drawing on experience with the Pickering NGS A simulator. Simulators, he concludes, are important aids to training but by no means all that is required to guarantee capable First Operators

  3. Peer-teaching in the food chemistry laboratory: student-produced experiments, peer and audio feedback, and integration of employability skills

    Directory of Open Access Journals (Sweden)

    Julie Lisa Dunne

    2014-10-01

    Full Text Available This paper describes the author’s experience over the last several years of implementing an alternative Food Chemistry laboratory practical model for a group of third-year BSc Nutraceuticals students. The initial main objectives were to prepare students for the more independent final-year research project; to incorporate innovative approaches to feedback; and to integrate key employability skills into the curriculum. These were achieved through building the skills required to ultimately allow students working in groups to research, design and run a laboratory for their class. The first year of the project involved innovative approaches to feedback, including weekly feedback sessions, report checklists and audio feedback podcasts. Student evaluation after one year suggested the case group felt more prepared for final-year research projects and work placement owing to the redesign of the laboratory assessment. This, together with general positive feedback across several indicators, was proof of concept, and was a foundation for an improved model. The improvements related to the organisation and management of the project, but the same pedagogical approach has been retained. The second year saw the introduction of a more rigorous and easier to manage peer evaluation though use of the online Comprehensive Assessment for Team-Member Effectiveness (CATME tool. The most recent revision has included a Project Wiki hosted on Blackboard to facilitate the organisation, communication, assessment and feedback of student-generated resources.More recently, the final-year students who had participated in the peer-teaching Food Chemistry labs when in third year have been evaluated. This evaluation took place following their research projects, and suggests that the peer-teaching model better prepared them for these activities, compared to traditional laboratories.

  4. Operational safety experience reporting in the United States

    International Nuclear Information System (INIS)

    Hartfield, R.A.

    1978-01-01

    Licensees of nuclear power plants in the United States have many reporting requirements included in their technical specifications and the code of federal regulations, title 10. The Nuclear Regulatory Commisson receives these reports and utilizes them in its regulatory program. Part of this usage includes collecting and publishing this operating experience data in various reports and storing information in various data systems. This paper will discuss the data systems and reports on operating experience published and used by the NRC. In addition, some observations on operating experience will be made. Subjects included will be the Licensee Event Report (LER) Data File, the Operating Unit Status Report (Gray Book), Radiation Exposure Reports, Effluents Reports, the Nuclear Plant Reliability Data System, Current Events, Bulletin Wrapups and Annual Summaries. Some of the uses of the reports and systems will be discussed. The Abnormal Occurence Report to the US Congress will also be described and discussed. (author)

  5. Physical limits of feedback noise-suppression in biological networks

    International Nuclear Information System (INIS)

    Zhang, Jiajun; Yuan, Zhanjiang; Zhou, Tianshou

    2009-01-01

    Feedback is a ubiquitous control mechanism of biological networks, and has also been identified in a variety of regulatory systems and organisms. It has been shown that, for a given gain and with negligible intrinsic noise, negative feedback impairs noise buffering whereas positive feedback enhances noise buffering. We further investigate the influence of negative and positive feedback on noise in output signals by considering both intrinsic and extrinsic noise as well as operator noise. We find that, while maintaining the system sensitivity, either there exists a minimum of the output noise intensity corresponding to a biologically feasible feedback strength, or the output noise intensity is a monotonic function of feedback strength bounded by both biological and dynamical constraints. In both cases, feedback noise-suppression is physically limited. In other words, noise suppressed by negative or positive feedback cannot be reduced without limitation even in the case of slow transcription

  6. Proceedings of 2nd PHWR operating safety experience meeting

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1991-04-01

    Papers presented during the eight sessions of the meeting were devoted to the impact of PHWR operating experience on design of civil structures (reactor building integrity); operating experiences related to pressure tubes, nuclear steam supply system, plant stability; reactor maintenance and control systems, reactor operational safety. Some events concerned with reactor shutdown due to power failures are described, as well as action undertaken to prevent major damage.

  7. Proceedings of 2nd PHWR operating safety experience meeting

    International Nuclear Information System (INIS)

    1991-04-01

    Papers presented during the eight sessions of the meeting were devoted to the impact of PHWR operating experience on design of civil structures (reactor building integrity); operating experiences related to pressure tubes, nuclear steam supply system, plant stability; reactor maintenance and control systems, reactor operational safety. Some events concerned with reactor shutdown due to power failures are described, as well as action undertaken to prevent major damage

  8. Operation safety of complex industrial systems

    International Nuclear Information System (INIS)

    Zwingelstein, G.

    1999-01-01

    Zero fault or zero risk is an unreachable goal in industrial activities like nuclear activities. However, methods and techniques exist to reduce the risks to the lowest possible and acceptable level. The operation safety consists in the recognition, evaluation, prediction, measurement and mastery of technological and human faults. This paper analyses each of these points successively: 1 - evolution of operation safety; 2 - definitions and basic concepts: failure, missions and functions of a system and of its components, basic concepts and operation safety; 3 - forecasting analysis of operation safety: reliability data, data-banks, precautions for the use of experience feedback data; realization of an operation safety study: management of operation safety, quality assurance, critical review and audit of operation safety studies; 6 - conclusions. (J.S.)

  9. The Patient Feedback Response Framework - Understanding why UK hospital staff find it difficult to make improvements based on patient feedback: A qualitative study.

    Science.gov (United States)

    Sheard, Laura; Marsh, Claire; O'Hara, Jane; Armitage, Gerry; Wright, John; Lawton, Rebecca

    2017-04-01

    Patients are increasingly being asked for feedback about their healthcare experiences. However, healthcare staff often find it difficult to act on this feedback in order to make improvements to services. This paper draws upon notions of legitimacy and readiness to develop a conceptual framework (Patient Feedback Response Framework - PFRF) which outlines why staff may find it problematic to respond to patient feedback. A large qualitative study was conducted with 17 ward based teams between 2013 and 2014, across three hospital Trusts in the North of England. This was a process evaluation of a wider study where ward staff were encouraged to make action plans based on patient feedback. We focus on three methods here: i) examination of taped discussion between ward staff during action planning meetings ii) facilitators notes of these meetings iii) telephone interviews with staff focusing on whether action plans had been achieved six months later. Analysis employed an abductive approach. Through the development of the PFRF, we found that making changes based on patient feedback is a complex multi-tiered process and not something that ward staff can simply 'do'. First, staff must exhibit normative legitimacy - the belief that listening to patients is a worthwhile exercise. Second, structural legitimacy has to be in place - ward teams need adequate autonomy, ownership and resource to enact change. Some ward teams are able to make improvements within their immediate control and environment. Third, for those staff who require interdepartmental co-operation or high level assistance to achieve change, organisational readiness must exist at the level of the hospital otherwise improvement will rarely be enacted. Case studies drawn from our empirical data demonstrate the above. It is only when appropriate levels of individual and organisational capacity to change exist, that patient feedback is likely to be acted upon to improve services. Copyright © 2017 The Authors. Published

  10. Simulator training and licensing examination for nuclear power station operator

    International Nuclear Information System (INIS)

    Xu Pingsheng

    2007-01-01

    For the recruitment, training and position qualification of the simulator instructors and feedback of training effect, the management approaches are formulated in 'The System for Simulator Training and Licensing Examination of Daya Bay Nuclear Power Station Operators'. The concrete requirements on the professional knowledge, work experience and foreign language ability of a simulator instructor are put forward. The process of instructor training is designed. The training items include the trainer training, pedagogy training, time management training, operation activities training during outage of unit, 'shadow' training and on-the-jot training on simulator courses. Job rotation is realized between simulator instructor and licensing personnel on site. New simulator instructor must pass the qualification identification. After a duration of 2 years, re-qualification has to be carried out. On the basis of the operator training method introduced from EDF (electricite De France), some new courses are developed and the improvement on the initial training, retaining courses, the technical support and the experience feedback by using the simulator is done also. (authors)

  11. Dry cooling tower operating experience in the LOFT reactor

    International Nuclear Information System (INIS)

    Hunter, J.A.

    1980-01-01

    A dry cooling tower has been uniquely utilized to dissipate heat generated in a small experimental pressurized water nuclear reactor. Operational experience revealed that dry cooling towers can be intermittently operated with minimal wind susceptibility and water hammer occurrences by cooling potential steam sources after a reactor scram, by isolating idle tubes from the external atmosphere, and by operating at relatively high pressures. Operating experience has also revealed that tube freezing can be minimized by incorporating the proper heating and heat loss prevention features

  12. Operating experience with the DRAGON High Temperature Reactor experiment

    International Nuclear Information System (INIS)

    Simon, R.A.; Capp, P.D.

    2002-01-01

    The Dragon Reactor Experiment in Winfrith/UK was a materials test facility for a number of HTR projects pursued in the sixties and seventies of the last century. It was built and managed as an OECD/NEA international joint undertaking. The reactor operated successfully between 1964 and 1975 to satisfy the growing demand for irradiation testing of fuels and fuel elements as well as for technological tests of components and materials. The paper describes the reactor's main experimental features and presents results of 11 years of reactor operation relevant for future HTRs. (author)

  13. Study on training of nuclear power system operators

    International Nuclear Information System (INIS)

    Guo Lifeng; Zhou Gang; Yu Lei

    2012-01-01

    In order to satisfy new requirements about operators of nuclear power system, which are brought up by development and changes of social environment, science and technology, we do research on and make analysis of the problem of operator training. This paper focuses on development and changes of operator training system and content, mentality training, application of new technology to training, feedback of experience and so on. Analysis showed that the content of operator training is also confronted with some new requirements. So we bring up the new requirements to the operator, such as mentality training, cognizance ability training, adaptability training of special environment and endurance training. Besides, it is important for perfecting operator cultivation mechanism and improving training effect to feed back experience and apply new technology. So the trainer must improve training content and cultivation mechanism continuously. (authors)

  14. Delayed feedback control in quantum transport.

    Science.gov (United States)

    Emary, Clive

    2013-09-28

    Feedback control in quantum transport has been predicted to give rise to several interesting effects, among them quantum state stabilization and the realization of a mesoscopic Maxwell's daemon. These results were derived under the assumption that control operations on the system are affected instantaneously after the measurement of electronic jumps through it. In this contribution, I describe how to include a delay between detection and control operation in the master equation theory of feedback-controlled quantum transport. I investigate the consequences of delay for the state stabilization and Maxwell's daemon schemes. Furthermore, I describe how delay can be used as a tool to probe coherent oscillations of electrons within a transport system and how this formalism can be used to model finite detector bandwidth.

  15. Social closeness and feedback modulate susceptibility to the framing effect.

    Science.gov (United States)

    Sip, Kamila E; Smith, David V; Porcelli, Anthony J; Kar, Kohitij; Delgado, Mauricio R

    2015-01-01

    Although we often seek social feedback (SFB) from others to help us make decisions, little is known about how SFB affects decisions under risk, particularly from a close peer. We conducted two experiments using an established framing task to probe how decision-making is modulated by SFB valence (positive, negative) and the level of closeness with feedback provider (friend, confederate). Participants faced mathematically equivalent decisions framed as either an opportunity to keep (gain frame) or lose (loss frame) part of an initial endowment. Periodically, participants were provided with positive (e.g., "Nice!") or negative (e.g., "Lame!") feedback about their choices. Such feedback was provided by either a confederate (Experiment 1) or a gender-matched close friend (Experiment 2). As expected, the framing effect was observed in both experiments. Critically, an individual's susceptibility to the framing effect was modulated by the valence of the SFB, but only when the feedback provider was a close friend. This effect was reflected in the activation patterns of ventromedial prefrontal cortex and posterior cingulate cortex, regions involved in complex decision-making. Taken together, these results highlight social closeness as an important factor in understanding the impact of SFB on neural mechanisms of decision-making.

  16. Operating Experience Review of Tritium-in-Water Monitors

    Energy Technology Data Exchange (ETDEWEB)

    S. A. Bruyere; L. C. Cadwallader

    2011-09-01

    Monitoring tritium facility and fusion experiment effluent streams is an environmental safety requirement. This paper presents data on the operating experience of a solid scintillant monitor for tritium in effluent water. Operating experiences were used to calculate an average monitor failure rate of 4E-05/hour for failure to function. Maintenance experiences were examined to find the active repair time for this type of monitor, which varied from 22 minutes for filter replacement to 11 days of downtime while waiting for spare parts to arrive on site. These data support planning for monitor use; the number of monitors needed, allocating technician time for maintenance, inventories of spare parts, and other issues.

  17. The experience of five years operation of Phenix

    International Nuclear Information System (INIS)

    Conte, F.; Lacroix, A.

    1980-01-01

    Two long periods of exceptional operation have satisfied the hopes of the designers and all parameters, power, efficiency, load factor, fuel behaviour, were better than was expected. The experience resulting from the only major incident provided a series of complementary data. Modern technology has need of sanction by experiment. The Phenix type reactor is a tool which is convenient to operate and to maintain. The two aspects of the demonstration, correct operation and ease of maintenance, take a concrete form in the harmlessness of Phenix on men and on the environment. There is no irradiation and few releases. (orig./DG)

  18. Implementation status of the global and local beam position feedback systems for the Advanced Photon Source storage ring

    International Nuclear Information System (INIS)

    Chung, Y.; Barr, D.; Decker, G.; Galayda, J.; Kirchman, J.; Lenkszus, F.; Lumpkin, A.; Votaw, A.J.

    1995-01-01

    The Advanced Photon Source (APS) is implementing an extensive beam position feedback system for both global and local stabilization of particle and photon beams based on digital signal processing. The description and operational experience of the system will be given in this paper. In particular, we will discuss the underlying fundamental principles, hardware layout, controls interface, and automatic software generation for multiple digital signal processors (DSPS) distributed in 20 VME crates around the ring. The feedback system runs at 4-kHz sampling frequency in order to achieve the correction bandwidth of approximately 100 Hz. For the maximum correction efficiency and resolution of conflicts among multiple local feedback systems due to the local bump closure error, the global and local feedback systems are combined into a single unified system. This novel approach is made possible through data sharing among the global and local systems via the fiber-optically networked reflective memories

  19. Experimental Verification of Dynamic Operation of Continuous and Multivessel Batch Distillation

    Energy Technology Data Exchange (ETDEWEB)

    Wittgens, Bernd

    1999-07-01

    This thesis presents a rigorous model based on first principles for dynamic simulation of the composition dynamics of a staged high-purity continuous distillation columns and experiments performed to verify it. The thesis also demonstrates the importance of tray hydraulics to obtain good agreement between simulation and experiment and derives analytic expressions for dynamic time constants for use in simplified and vapour dynamics. A newly developed multivessel batch distillation column consisting of a reboiler, intermediate vessels and a condenser vessel provides a generalization of previously proposed batch distillation schemes. The total reflux operation of this column was presented previously and the present thesis proposes a simple feedback control strategy for its operation based on temperature measurements. The feasibility of this strategy is demonstrated by simulations and verified by laboratory experiments. It is concluded that the multivessel column can be easily operated with simple temperature controllers, where the holdups are only controlled indirectly. For a given set of temperature setpoints, the final product compositions are independent of the initial feed composition. When the multivessel batch distillation column is compared to a conventional batch column, both operated under feedback control, it is found that the energy required to separate a multicomponent mixture into highly pure products is much less for the multivessel system. This system is also the simplest one to operate.

  20. A reduced feedback proportional fair multiuser scheduling scheme

    KAUST Repository

    Shaqfeh, Mohammad

    2011-12-01

    Multiuser switched-diversity scheduling schemes were recently proposed in order to overcome the heavy feedback requirements of conventional opportunistic scheduling schemes by applying a threshold-based, distributed and ordered scheduling mechanism. A slight reduction in the prospected multiuser diversity gains is an acceptable trade-off for great savings in terms of required channel-state-information feedback messages. In this work, we propose a novel proportional fair multiuser switched-diversity scheduling scheme and we demonstrate that it can be optimized using a practical and distributed method to obtain the per-user feedback thresholds. We demonstrate by numerical examples that our reduced feedback proportional fair scheduler operates within 0.3 bits/sec/Hz from the achievable rates by the conventional full feedback proportional fair scheduler in Rayleigh fading conditions. © 2011 IEEE.

  1. Fabrication of a thin-film capacitive force sensor array for tactile feedback in robotic surgery.

    Science.gov (United States)

    Paydar, Omeed H; Wottawa, Christopher R; Fan, Richard E; Dutson, Erik P; Grundfest, Warren S; Culjat, Martin O; Candler, Rob N

    2012-01-01

    Although surgical robotic systems provide several advantages over conventional minimally invasive techniques, they are limited by a lack of tactile feedback. Recent research efforts have successfully integrated tactile feedback components onto surgical robotic systems, and have shown significant improvement to surgical control during in vitro experiments. The primary barrier to the adoption of tactile feedback in clinical use is the unavailability of suitable force sensing technologies. This paper describes the design and fabrication of a thin-film capacitive force sensor array that is intended for integration with tactile feedback systems. This capacitive force sensing technology could provide precise, high-sensitivity, real-time responses to both static and dynamic loads. Capacitive force sensors were designed to operate with optimal sensitivity and dynamic range in the range of forces typical in minimally invasive surgery (0-40 N). Initial results validate the fabrication of these capacitive force-sensing arrays. We report 16.3 pF and 146 pF for 1-mm(2) and 9-mm(2) capacitive areas, respectively, whose values are within 3% of theoretical predictions.

  2. The positive impact of structured teaching in the operating room.

    Science.gov (United States)

    Leung, Yee; Salfinger, Stuart; Mercer, Annette

    2015-12-01

    A survey of obstetric and gynaecology trainees in Australia found the trainee's opinion of the consultants' teaching ability for laparoscopic procedures and procedures dealing with complications as 'poor' in 21.2% and 23.4% of responses, respectively (Aust NZ J Obstet Gynaecol 2009; 49: 84). Surgical caseload per trainee is falling for a variety of reasons. Strategies need to be adopted to enhance the surgical learning experience of trainees in the operating room. We describe the use of a structured encounter template to facilitate the teaching of surgery in the operating room and report the response of the trainees to this intervention. Trainees attached to a gynaecologic surgery unit all underwent surgical training using a set format based on the surgical encounter template, including briefing, goal setting and intra-operative teaching aims as well as debriefing. Data on the trainees' experience and perception of their learning experience were then collected and analysed as quantitative and qualitative data sets. The trainees reported satisfaction with the use of a structured encounter template to facilitate the surgical teaching in the operating room. Some trainees had not received such clarity of feedback or the opportunity to complete a procedure independently prior to using the structured encounter template. A structured surgical encounter template based on andragogy principles to focus consultant teaching in the operating room is highly acceptable to obstetric and gynaecology trainees in Australia. Allowing the trainee the opportunity to set objectives and receive feedback empowers the trainee and enhances their educational experience. © 2015 The Royal Australian and New Zealand College of Obstetricians and Gynaecologists.

  3. Telescience testbed: Operational support functions for biomedical experiments

    Science.gov (United States)

    Yamashita, Masamichi; Watanabe, Satoru; Shoji, Takatoshi; Clarke, Andrew H.; Suzuki, Hiroyuki; Yanagihara, Dai

    A telescience testbed was conducted to study the methodology of space biomedicine with simulated constraints imposed on space experiments. An experimental subject selected for this testbedding was an elaborate surgery of animals and electrophysiological measurements conducted by an operator onboard. The standing potential in the ampulla of the pigeon's semicircular canal was measured during gravitational and caloric stimulation. A principal investigator, isolated from the operation site, participated in the experiment interactively by telecommunication links. Reliability analysis was applied to the whole layers of experimentation, including design of experimental objectives and operational procedures. Engineering and technological aspects of telescience are discussed in terms of reliability to assure quality of science. Feasibility of robotics was examined for supportive functions to reduce the workload of the onboard operator.

  4. LOFT instrumented fuel design and operating experience

    International Nuclear Information System (INIS)

    Russell, M.L.

    1979-01-01

    A summary description of the Loss-of-Fluid Test (LOFT) system instrumented core construction details and operating experience through reactor startup and loss-of-coolant experiment (LOCE) operations performed to date are discussed. The discussion includes details of the test instrumentation attachment to the fuel assembly, the structural response of the fuel modules to the forces generated by a double-ended break of a pressurized water reactor (PWR) coolant pipe at the inlet to the reactor vessel, the durability of the LOFT fuel and test instrumentation, and the plans for incorporation of improved fuel assembly test instrumentation features in the LOFT core

  5. Nuclear power plant operating experience, 1976

    International Nuclear Information System (INIS)

    1977-11-01

    This report is the third in a series of reports issued annually that summarize the operating experience of U.S. nuclear power plants in commercial operation. Power generation statistics, plant outages, reportable occurrences, fuel element performance, occupational radiation exposure and radioactive effluents for each plant are presented. Summary highlights of these areas are discussed. The report includes 1976 data from 55 plants--23 boiling water reactor plants and 32 pressurized water reactor plants

  6. Cryogenic system operating experience review for fusion applications

    International Nuclear Information System (INIS)

    Cadwallader, L.C.

    1992-01-01

    This report presents a review of cryogenic system operating experiences, from particle accelerator, fusion experiment, space research, and other applications. Safety relevant operating experiences and accident information are discussed. Quantitative order-of-magnitude estimates of cryogenic component failure rates and accident initiating event frequencies are presented for use in risk assessment, reliability, and availability studies. Safety concerns with cryogenic systems are discussed, including ozone formation, effects of spills, and modeling spill behavior. This information should be useful to fusion system designers and safety analysts, such as the team working on the International Thermonuclear Experimental Reactor design

  7. Specificity of Practice: Interaction between Concurrent Sensory Information and Terminal Feedback

    Science.gov (United States)

    Blandin, Yannick; Toussaint, Lucette; Shea, Charles H.

    2008-01-01

    In 2 experiments, the authors investigated a potential interaction involving the processing of concurrent feedback using design features from the specificity of practice literature and the processing of terminal feedback using a manipulation from the guidance hypothesis literature. In Experiment 1, participants produced (198 trials)…

  8. Efeito do tempo de experiência de operadores de Harvester no rendimento operacional Effect of time experience of Harvester operators in operating yield

    Directory of Open Access Journals (Sweden)

    Elaine Cristina Leonello

    2012-12-01

    Full Text Available A mecanização da colheita de madeira permite maior controle dos custos e pode proporcionar reduções em prazos relativamente curtos. Além disso, tem um lugar de destaque na humanização do trabalho florestal e no aumento do rendimento operacional. O presente trabalho teve por objetivo avaliar o desempenho de operadores de harvester em função do tempo de experiência na atividade. Foram avaliados oito operadores do sexo masculino, com idade entre 23 e 46 anos. O estudo consistiu na análise do volume de madeira colhida pelo harvester. O tempo de experiência afeta significativamente o rendimento operacional dos operadores de harvester. Tal rendimento aumenta expressivamente nos primeiros 18 meses de experiência, mantendo-se em ascensão nos próximos 26 meses. Após os 44 meses de experiência, o rendimento dos operadores tende a reduzir, revelando as possíveis acomodações do cotidiano. Tais resultados permitem concluir que por volta dos 50 meses de experiência na atividade de operação de harvester, se faz necessária a adoção de medidas de reciclagem, motivação, entre outras, a fim de proporcionar aos operadores melhores condições de trabalho que os possibilitem continuar exercendo a atividade de forma eficiente e rentável à empresa.The mechanization of timber harvesting allows greater control of costs and can provide reductions in relatively short intervals. Moreover, it has a place in the humanization of the working forest and the increase in performance. This work provides comparisons of operating performance of different operator harvester according to the time of experience in the activity. The operators evaluated were eight males, aged between 23 and 46 years old. The study consisted of analysis of the volume of timber harvested by the harvester. The experience significantly affects the performance of harvesters operators. The performance increases significantly in the first 18 months of experience, and it remained on

  9. Stack Monitor Operating Experience Review

    International Nuclear Information System (INIS)

    Cadwallader, L.C.; Bruyere, S.A.

    2009-01-01

    Stack monitors are used to sense radioactive particulates and gases in effluent air being vented from rooms of nuclear facilities. These monitors record the levels and types of effluents to the environment. This paper presents the results of a stack monitor operating experience review of the U.S. Department of Energy (DOE) Occurrence Reporting and Processing System (ORPS) database records from the past 18 years. Regulations regarding these monitors are briefly described. Operating experiences reported by the U.S. DOE and in engineering literature sources were reviewed to determine the strengths and weaknesses of these monitors. Electrical faults, radiation instrumentation faults, and human errors are the three leading causes of failures. A representative 'all modes' failure rate is 1E-04/hr. Repair time estimates vary from an average repair time of 17.5 hours (with spare parts on hand) to 160 hours (without spare parts on hand). These data should support the use of stack monitors in any nuclear facility, including the National Ignition Facility and the international ITER project.

  10. The role of haptic feedback in laparoscopic simulation training.

    Science.gov (United States)

    Panait, Lucian; Akkary, Ehab; Bell, Robert L; Roberts, Kurt E; Dudrick, Stanley J; Duffy, Andrew J

    2009-10-01

    Laparoscopic virtual reality simulators are becoming a ubiquitous tool in resident training and assessment. These devices provide the operator with various levels of realism, including haptic (or force) feedback. However, this feature adds significantly to the cost of the devices, and limited data exist assessing the value of haptics in skill acquisition and development. Utilizing the Laparoscopy VR (Immersion Medical, Gaithersburg, MD), we hypothesized that the incorporation of force feedback in the simulated operative environment would allow superior trainee performance compared with performance of the same basic skills tasks in a non-haptic model. Ten medical students with minimal laparoscopic experience and similar baseline skill levels as proven by performance of two fundamentals of laparoscopic surgery (FLS) tasks (peg transfer and cutting drills) voluntarily participated in the study. Each performed two tasks, analogous to the FLS drills, on the Laparoscopy VR at 3 levels of difficulty, based on the established settings of the manufacturer. After achieving familiarity with the device and tasks, the students completed the drills both with and without force feedback. Data on completion time, instrument path length, right and left hand errors, and grasping tension were analyzed. The scores in the haptic-enhanced simulation environment were compared with the scores in the non-haptic model and analyzed utilizing Student's t-test. The peg transfer drill showed no difference in performance between the haptic and non-haptic simulations for all metrics at all three levels of difficulty. For the more complex cutting exercise, the time to complete the tasks was significantly shorter when force feedback was provided, at all levels of difficulty (158+/-56 versus 187+/-51 s, 176+/-49 versus 222+/-68 s, and 275+/-76 versus 422+/-220 s, at levels 1, 2, and 3, respectively, Psimulation did not demonstrate an appreciable performance improvement among our trainees. These data

  11. 14th Biennial conference on reactor operating experience plant operations: The human element

    International Nuclear Information System (INIS)

    Anon.

    1989-01-01

    Separate abstracts were prepared for the papers presented in the following areas of interest: enhancing operator performance; structured approaches to maintenance standards and reliability-centered maintenance; human issues in plant operations and management; test, research, and training reactor utilization; methods and applications of root-cause analysis; emergency operating procedure enhancement programs; test, research, and training reactor upgrades; valve maintenance and diagnostics; recent operating experiences; and current maintenance issues

  12. Next Generation Environmentally-Friendly Driving Feedback Systems Research and Development

    Energy Technology Data Exchange (ETDEWEB)

    Barth, Matthew [Regents Of The University Of California, Riverside, CA (United States); Boriboonsomsin, Kanok [Regents Of The University Of California, Riverside, CA (United States)

    2014-12-31

    The objective of this project is to design, develop, and demonstrate a next-generation, federal safety- and emission-complaint driving feedback system that can be deployed across the existing vehicle fleet and improve fleet average fuel efficiency by at least 2%. The project objective was achieved with the driving feedback system that encourages fuel-efficient vehicle travel and operation through: 1) Eco-Routing Navigation module that suggests the most fuel-efficient route from one stop to the next, 2) Eco-Driving Feedback module that provides sensible information, recommendation, and warning regarding fuel-efficient vehicle operation, and 3) Eco-Score and Eco-Rank module that provides a means for driving performance tracking, self-evaluation, and peer comparison. The system also collects and stores vehicle travel and operation data, which are used by Algorithm Updating module to customize the other modules for specific vehicles and adapts them to specific drivers over time. The driving feedback system was designed and developed as an aftermarket technology that can be retrofitted to vehicles in the existing fleet. It consists of a mobile application for smart devices running Android operating system, a vehicle on-board diagnostics connector, and a data server. While the system receives and utilizes real-time vehicle and engine data from the vehicle’s controller area network bus through the vehicle’s on-board diagnostic connector, it does not modify or interfere with the vehicle’s controller area network bus, and thus, is in compliance with federal safety and emission regulations. The driving feedback system was demonstrated and then installed on 45 vehicles from three different fleets for field operational test. These include 15 private vehicles of the general public, 15 pickup trucks of the California Department of Transportation that are assigned to individual employees for business use, and 15 shuttle buses of the Riverside Transit Agency that are used

  13. Zinc injection on the EDF pressurized light water reactors. Current results and operating experience feedback

    International Nuclear Information System (INIS)

    Piana, Olivier; Duval, Arnaud; Moleiro, Edgar; Benfarah, Moez; Bretelle, Jean-Luc; Chaigne, Guy

    2014-01-01

    Nowadays, zinc injection, as well as pH management and hydrogen control, is increasingly considered as an essential element of PWR Primary Water Chemistry worldwide. After a first implementation of zinc injection at Bugey 2 since 2004 and Bugey 4 since 2006, EDF decided to extend this practice, which constitutes a modification of primary circuit chemical conditioning, to other units of its fleet. Currently, 15 among the 58 reactors of the French fleet are injecting depleted zinc acetate into the primary coolant water. Three main goals were identified at the beginning of this program. Indeed, the expected benefits of zinc injection were: Reduction of the rate of generalized corrosion and mitigation of stress corrosion cracking initiation on nickel based alloys (Material goal). Curative or preventive reduction of radiation sources to which workers are exposed (Radiation fields' goal). Mitigation of the AOA or CIPS risks by reduction of corrosion products releases and mitigation of crud deposition (Fuel protection goal). To monitor the zinc addition, EDF has defined a complete survey program concerning: chemistry and radiochemistry responses (primary coolant monitoring of corrosion and fission products and calculation of zinc injected, zinc removed and zinc incorporated in RCS surfaces) ; radiation fields (dose rates and deposited activities measurements) ; materials (statistical analysis of SG tube cracks) ; fuel (oxide thickness measurements and visual exams) ; effluents (corrosion products releases and isotopic distribution follow up) ; wastes (radiochemical characterization of filters). This paper will detail the present results of this monitoring program. It appears that the expected benefits of zinc injection have yet to be fully realized; further operating experience will be required in order to fully evaluate its impact. (author)

  14. Higher operational safety of nuclear power plants by evaluating the behaviour of operating personnel

    International Nuclear Information System (INIS)

    Mertins, M.; Glasner, P.

    1990-01-01

    In the GDR power reactors have been operated since 1966. Since that time operational experiences of 73 cumulative reactor years have been collected. The behaviour of operating personnel is an essential factor to guarantee the safety of operation of the nuclear power plant. Therefore a continuous analysis of the behaviour of operating personnel has been introduced at the GDR nuclear power plants. In the paper the overall system of the selection, preparation and control of the behaviour of nuclear power plant operating personnel is presented. The methods concerned are based on recording all errors of operating personnel and on analyzing them in order to find out the reasons. The aim of the analysis of reasons is to reduce the number of errors. By a feedback of experiences the nuclear safety of the nuclear power plant can be increased. All data necessary for the evaluation of errors are recorded and evaluated by a computer program. This method is explained thoroughly in the paper. Selected results of error analysis are presented. It is explained how the activities of the personnel are made safer by means of this analysis. Comparisons with other methods are made. (author). 3 refs, 4 figs

  15. The Impact of feedback and incentive schemes on performance

    OpenAIRE

    Bruun-Olsen, Alexandra M.; Engelsen Eian, Camilla

    2015-01-01

    Master's thesis in Business administration In this thesis we analyze how different feedback (objective and subjective), incentive schemes (fixed pay and performance pay), and the interaction between them impact performance. To answer our research question we conduct a lab experiment on students from the University of Stavanger. The experiment consists of subjects performing a combined coloring- and calculation task over three periods and receiving either objective or subjective feedback af...

  16. US nuclear power plant operating cost and experience summaries

    International Nuclear Information System (INIS)

    Kohn, W.E.; Reid, R.L.; White, V.S.

    1998-02-01

    NUREG/CR-6577, U.S. Nuclear Power Plant Operating Cost and Experience Summaries, has been prepared to provide historical operating cost and experience information on U.S. commercial nuclear power plants. Cost incurred after initial construction are characterized as annual production costs, representing fuel and plant operating and maintenance expenses, and capital expenditures related to facility additions/modifications which are included in the plant capital asset base. As discussed in the report, annual data for these two cost categories were obtained from publicly available reports and must be accepted as having different degrees of accuracy and completeness. Treatment of inconclusive and incomplete data is discussed. As an aid to understanding the fluctuations in the cost histories, operating summaries for each nuclear unit are provided. The intent of these summaries is to identify important operating events; refueling, major maintenance, and other significant outages; operating milestones; and significant licensing or enforcement actions. Information used in the summaries is condensed from annual operating reports submitted by the licensees, plant histories contained in Nuclear Power Experience, trade press articles, and the Nuclear Regulatory Commission (NRC) web site (www.nrc.gov)

  17. US nuclear power plant operating cost and experience summaries

    Energy Technology Data Exchange (ETDEWEB)

    Kohn, W.E.; Reid, R.L.; White, V.S.

    1998-02-01

    NUREG/CR-6577, U.S. Nuclear Power Plant Operating Cost and Experience Summaries, has been prepared to provide historical operating cost and experience information on U.S. commercial nuclear power plants. Cost incurred after initial construction are characterized as annual production costs, representing fuel and plant operating and maintenance expenses, and capital expenditures related to facility additions/modifications which are included in the plant capital asset base. As discussed in the report, annual data for these two cost categories were obtained from publicly available reports and must be accepted as having different degrees of accuracy and completeness. Treatment of inconclusive and incomplete data is discussed. As an aid to understanding the fluctuations in the cost histories, operating summaries for each nuclear unit are provided. The intent of these summaries is to identify important operating events; refueling, major maintenance, and other significant outages; operating milestones; and significant licensing or enforcement actions. Information used in the summaries is condensed from annual operating reports submitted by the licensees, plant histories contained in Nuclear Power Experience, trade press articles, and the Nuclear Regulatory Commission (NRC) web site (www.nrc.gov).

  18. Social Media and Peer Feedback: What Do Students Really Think about Using Wiki and Facebook as Platforms for Peer Feedback?

    Science.gov (United States)

    Demirbilek, Muhammet

    2015-01-01

    Web 2.0 tools are becoming increasingly pervasive in higher education, and as a result, there is increasing interest in the use of online feedback activities. This study investigated students' actual experiences and perceptions using social media, Wiki and Facebook, tools to provide peer feedback on students' instructional material projects and to…

  19. Fort Saint Vrain operational experience

    International Nuclear Information System (INIS)

    Fuller, C.H.

    1989-01-01

    Fort St. Vrain (FSV), on the system of the Public Service Company of Colorado, is the only high temperature gas-cooled (HTGR) power reactor in the United States. The plant features a helium-cooled reactor with a uranium-thorium fuel cycle. The paper describes the experience made during its operation. (author). 2 refs, 4 figs, 2 tabs

  20. Comparing PRAs with operating experience

    International Nuclear Information System (INIS)

    Picard, R.R.; Martz, H.F.

    1998-01-01

    Probabilistic Risk Assessment is widely used to estimate the frequencies of rare events, such as nuclear power plant accidents. An obvious question concerns the extent to which PRAs conform to operating experience--that is, do PRAs agree with reality? The authors discuss a formal methodology to address this issue and examine its performance using plant-specific data

  1. Relational interaction in occupational therapy: Conversation analysis of positive feedback.

    Science.gov (United States)

    Weiste, Elina

    2018-01-01

    The therapeutic relationship is an important factor for good therapy outcomes. The primary mediator of a beneficial therapy relationship is clinician-client interaction. However, few studies identify the observable interactional attributes of good quality relational interactions, e.g. offering the client positive feedback. The present paper aims to expand current understanding of relational interaction by analyzing the real-time interactional practices therapists use for offering positive feedback, an important value in occupational therapy. The analysis is based on the conversation analysis of 15 video-recorded occupational therapy encounters in psychiatric outpatient clinics. Two types of positive feedback were identified. In aligning feedback, therapists encouraged and complimented clients' positive perspectives on their own achievements in adopting certain behaviour, encouraging and supporting their progress. In redirecting feedback, therapists shifted the perspective from clients' negative experiences to their positive experiences. This shift was interactionally successful if they laid the foundation for the shift in perspective and attuned their expressions to the clients' emotional states. Occupational therapists routinely provide their clients with positive feedback. Awareness of the interactional attributes related to positive feedback is critically important for successful relational interaction.

  2. Online feedback assessments in physiology: effects on students' learning experiences and outcomes.

    Science.gov (United States)

    Marden, Nicole Y; Ulman, Lesley G; Wilson, Fiona S; Velan, Gary M

    2013-06-01

    Online formative assessments have become increasingly popular; however, formal evidence supporting their educational benefits is limited. This study investigated the impact of online feedback quizzes on the learning experiences and outcomes of undergraduate students enrolled in an introductory physiology course. Four quiz models were tested, which differed in the amount of credit available, the number of attempts permitted, and whether the quizzes were invigilated or unsupervised, timed or untimed, or open or closed book. All quizzes were composed of multiple-choice questions and provided immediate individualized feedback. Summative end-of-course examination marks were analyzed with respect to performance in quizzes and were also compared with examination performance in the year before the quizzes were introduced. Online surveys were conducted to gather students' perceptions regarding the quizzes. The vast majority of students perceived online quizzes as a valuable learning tool. For all quiz models tested, there was a significant relationship between performance in quizzes and end-of-course examination scores. Importantly, students who performed poorly in quizzes were more likely to fail the examination, suggesting that formative online quizzes may be a useful tool to identify students in need of assistance. Of the four quiz models, only one quiz model was associated with a significant increase in mean examination performance. This model had the strongest formative focus, allowing multiple unsupervised and untimed attempts. This study suggests that the format of online formative assessments is critical in achieving the desired impact on student learning. Specifically, such assessments are most effective when they are low stakes.

  3. The benefits of computer-generated feedback for mathematics problem solving.

    Science.gov (United States)

    Fyfe, Emily R; Rittle-Johnson, Bethany

    2016-07-01

    The goal of the current research was to better understand when and why feedback has positive effects on learning and to identify features of feedback that may improve its efficacy. In a randomized experiment, second-grade children received instruction on a correct problem-solving strategy and then solved a set of relevant problems. Children were assigned to receive no feedback, immediate feedback, or summative feedback from the computer. On a posttest the following day, feedback resulted in higher scores relative to no feedback for children who started with low prior knowledge. Immediate feedback was particularly effective, facilitating mastery of the material for children with both low and high prior knowledge. Results suggest that minimal computer-generated feedback can be a powerful form of guidance during problem solving. Copyright © 2016 Elsevier Inc. All rights reserved.

  4. Natural uranium metallic fuel elements: fabrication and operating experience

    International Nuclear Information System (INIS)

    Hammad, F.H.; Abou-Zahra, A.A.; Sharkawy, S.W.

    1980-01-01

    The main reactor types based on natural uranium metallic fuel element, particularly the early types, are reviewed in this report. The reactor types are: graphite moderated air cooled, graphite moderated gas cooled and heavy water moderated reactors. The design features, fabrication technology of these reactor fuel elements and the operating experience gained during reactor operation are described and discussed. The interrelation between operating experience, fuel design and fabrication was also discussed with emphasis on improving fuel performance. (author)

  5. Shape memory alloy resistance behaviour at high altitude for feedback control

    Science.gov (United States)

    Ng, W. T.; Sedan, M. F.; Abdullah, E. J.; Azrad, S.; Harithuddin, A. S. M.

    2017-12-01

    Many recent aerospace technologies are using smart actuators to reduce the system's complexity and increase its reliability. One such actuator is shape memory alloy (SMA) actuator, which is lightweight, produces high force and large deflection. However, some disadvantages in using SMA actuators have been identified and they include nonlinear response of the strain to input current, hysteresis characteristic that results in inaccurate control and less than optimum system performance, high operating temperatures, slow response and also high requirement of electrical power to obtain the desired actuation forces. It is still unknown if the SMA actuators can perform effectively at high altitude with low surrounding temperature. The work presented here covers the preliminary process of verifying the feasibility of using resistance as feedback control at high altitude for aerospace applications. Temperature and resistance of SMA actuator at high altitude is investigated by conducting an experiment onboard a high altitude balloon. The results from the high altitude experiment indicate that the resistance or voltage drop of the SMA wire is not significantly affected by the low surrounding temperature at high altitude as compared to the temperature of SMA. Resistance feedback control for SMA actuators may be suitable for aerospace applications.

  6. Social closeness and feedback modulate susceptibility to the framing effect

    OpenAIRE

    Sip, Kamila E.; Smith, David V.; Porcelli, Anthony J.; Kar, Kohitij; Delgado, Mauricio R.

    2014-01-01

    Although, we often seek social feedback from others to help us make decisions, little is known about how social feedback affects decisions under risk, particularly from a close peer. We conducted two experiments using an established framing task to probe how decision making is modulated by social feedback valence (positive, negative) and the level of closeness with feedback provider (friend, confederate). Participants faced mathematically equivalent decisions framed as either an opportunity t...

  7. Comprehensive feedback on trainee surgeons’ non-technical skills

    Science.gov (United States)

    Dieckmann, Peter; Beier-Holgersen, Randi; Rosenberg, Jacob; Oestergaard, Doris

    2015-01-01

    Objectives This study aimed to explore the content of conversations, feedback style, and perceived usefulness of feedback to trainee surgeons when conversations were stimulated by a tool for assessing surgeons’ non-technical skills. Methods Trainee surgeons and their supervisors used the Non-Technical Skills for Surgeons in Denmark tool to stimulate feedback conversations. Audio recordings of post-operation feedback conversations were collected. Trainees and supervisors provided questionnaire responses on the usefulness and comprehensiveness of the feedback. The feedback conversations were qualitatively analyzed for content and feedback style. Usefulness was investigated using a scale from 1 to 5 and written comments were qualitatively analyzed. Results Six trainees and six supervisors participated in eight feedback conversations. Eighty questionnaires (response rate 83 percent) were collected from 13 trainees and 12 supervisors. Conversations lasted median eight (2-15) minutes. Supervisors used the elements and categories in the tool to structure the content of the conversations. Supervisors tended to talk about the trainees’ actions and their own frames rather than attempting to understand the trainees’ perceptions. Supervisors and trainees welcomed the feedback opportunity and agreed that the conversations were useful and comprehensive. Conclusions The content of the feedback conversations reflected the contents of the tool and the feedback was considered useful and comprehensive. However, supervisors talked primarily about their own frames, so in order for the feedback to reach its full potential, supervisors may benefit from training techniques to stimulate a deeper reflection among trainees. PMID:25602262

  8. Ventilation Systems Operating Experience Review for Fusion Applications

    International Nuclear Information System (INIS)

    Cadwallader, L.C.

    1999-01-01

    This report is a collection and review of system operation and failure experiences for air ventilation systems in nuclear facilities. These experiences are applicable for magnetic and inertial fusion facilities since air ventilation systems are support systems that can be considered generic to nuclear facilities. The report contains descriptions of ventilation system components, operating experiences with these systems, component failure rates, and component repair times. Since ventilation systems have a role in mitigating accident releases in nuclear facilities, these data are useful in safety analysis and risk assessment of public safety. An effort has also been given to identifying any safety issues with personnel operating or maintaining ventilation systems. Finally, the recommended failure data were compared to an independent data set to determine the accuracy of individual values. This comparison is useful for the International Energy Agency task on fusion component failure rate data collection

  9. Modelling of Rotor-gas bearings for Feedback Controller Design

    DEFF Research Database (Denmark)

    Theisen, Lukas Roy Svane; Niemann, Hans Henrik

    2014-01-01

    Controllable rotor-gas bearings are popular oering adaptability, high speed operation, low friction and clean operation. Rotor-gas bearings are however highly sensitive to disturbances due to the low friction of the injected gas. These undesirable damping properties call for controllers, which ca...... and are shown to accurately describe the dynamical behaviour of the rotor-gas bearing. Design of a controller using the identied models is treated and experiments verify the improvement of the damping properties of the rotor-gas bearing.......Controllable rotor-gas bearings are popular oering adaptability, high speed operation, low friction and clean operation. Rotor-gas bearings are however highly sensitive to disturbances due to the low friction of the injected gas. These undesirable damping properties call for controllers, which can...... be designed from suitable models describing the relation from actuator input to measured shaft position. Current state of the art models of controllable gas bearings however do not provide such relation, which calls for alternative strategies. The present contribution discusses the challenges for feedback...

  10. Spectral Characteristic Based on Fabry—Pérot Laser Diode with Two-Stage Optical Feedback

    International Nuclear Information System (INIS)

    Wu Jian-Wei; Nakarmi Bikash

    2013-01-01

    An optical device, consisting of a multi-mode Fabry—Pérot laser diode (MMFP-LD) with two-stage optical feedback, is proposed and experimentally demonstrated. The results show that the single-mode output with side-mode suppression ratio (SMSR) of ∼21.7 dB is attained by using the first-stage feedback. By using the second-stage feedback, the SMSR of single-mode operation could be increased to ∼28.5 dB while injection feedback power of −29 dBm is introduced into the laser diode. In the case of up to −29 dBm feedback power, the outcome SMSR is rapidly decayed to a very low level so that an obvious multi-mode operation in the output spectrum could be achieved at the feedback power level of −15.5 dBm. Thus, a transition between single- and multi-mode operations could be flexibly controlled by adjusting the injected power in the second-stage feedback system. Additionally, in the case of injection locking, the outcome SMSR and output power at the locked wavelength are as high as ∼50 dB and ∼5.8 dBm, respectively

  11. A Comparison of Written, Vocal, and Video Feedback When Training Teachers

    Science.gov (United States)

    Luck, Kally M.; Lerman, Dorothea C.; Wu, Wai-Ling; Dupuis, Danielle L.; Hussein, Louisa A.

    2018-01-01

    We compared the effectiveness of and preference for different feedback strategies when training six special education teachers during a 5-day summer training program. In Experiment 1, teachers received written or vocal feedback while learning to implement two different types of preference assessments. In Experiment 2, we compared either written or…

  12. Generation of chaotic radiation in a driven traveling wave tube amplifier with time-delayed feedback

    International Nuclear Information System (INIS)

    Marchewka, Chad; Larsen, Paul; Bhattacharjee, Sudeep; Booske, John; Sengele, Sean; Ryskin, Nikita; Titov, Vladimir

    2006-01-01

    The application of chaos in communications and radar offers new and interesting possibilities. This article describes investigations on the generation of chaos in a traveling wave tube (TWT) amplifier and the experimental parameters responsible for sustaining stable chaos. Chaos is generated in a TWT amplifier when it is made to operate in a highly nonlinear regime by recirculating a fraction of the TWT output power back to the input in a delayed feedback configuration. A driver wave provides a constant external force to the system making it behave like a forced nonlinear oscillator. The effects of the feedback bandwidth, intensity, and phase are described. The study illuminates the different transitions to chaos and the effect of parameters such as the frequency and intensity of the driver wave. The detuning frequency, i.e., difference frequency between the driver wave and the natural oscillation of the system, has been identified as being an important physical parameter for controlling evolution to chaos. Among the observed routes to chaos, besides the more common period doubling, a new route called loss of frequency locking occurs when the driving frequency is adjacent to a natural oscillation mode. The feedback bandwidth controls the nonlinear dynamics of the system, particularly the number of natural oscillation modes. A computational model has been developed to simulate the experiments and reasonably good agreement is obtained between them. Experiments are described that demonstrate the feasibility of chaotic communications using two TWTs, where one is operated as a driven chaotic oscillator and the other as a time-delayed, open-loop amplifier

  13. Generation of chaotic radiation in a driven traveling wave tube amplifier with time-delayed feedback

    Science.gov (United States)

    Marchewka, Chad; Larsen, Paul; Bhattacharjee, Sudeep; Booske, John; Sengele, Sean; Ryskin, Nikita; Titov, Vladimir

    2006-01-01

    The application of chaos in communications and radar offers new and interesting possibilities. This article describes investigations on the generation of chaos in a traveling wave tube (TWT) amplifier and the experimental parameters responsible for sustaining stable chaos. Chaos is generated in a TWT amplifier when it is made to operate in a highly nonlinear regime by recirculating a fraction of the TWT output power back to the input in a delayed feedback configuration. A driver wave provides a constant external force to the system making it behave like a forced nonlinear oscillator. The effects of the feedback bandwidth, intensity, and phase are described. The study illuminates the different transitions to chaos and the effect of parameters such as the frequency and intensity of the driver wave. The detuning frequency, i.e., difference frequency between the driver wave and the natural oscillation of the system, has been identified as being an important physical parameter for controlling evolution to chaos. Among the observed routes to chaos, besides the more common period doubling, a new route called loss of frequency locking occurs when the driving frequency is adjacent to a natural oscillation mode. The feedback bandwidth controls the nonlinear dynamics of the system, particularly the number of natural oscillation modes. A computational model has been developed to simulate the experiments and reasonably good agreement is obtained between them. Experiments are described that demonstrate the feasibility of chaotic communications using two TWTs, where one is operated as a driven chaotic oscillator and the other as a time-delayed, open-loop amplifier.

  14. Performance limitations of piezoelectric and force feedback electrostatic transducers in different applications

    International Nuclear Information System (INIS)

    Hadjiloucas, S; Walker, G C; Bowen, J W; Karatzas, L S

    2009-01-01

    Current limitations in piezoelectric and electrostatic transducers are discussed. A force-feedback electrostatic transducer capable of operating at bandwidths up to 20 kHz is described. Advantages of the proposed design are a linearised operation which simplifies the feedback control aspects and robustness of the performance characteristics to environmental perturbations. Applications in nanotechnology, optical sciences and acoustics are discussed.

  15. Performance limitations of piezoelectric and force feedback electrostatic transducers in different applications

    Energy Technology Data Exchange (ETDEWEB)

    Hadjiloucas, S; Walker, G C; Bowen, J W [Cybernetics, School of Systems Engineering, University of Reading, RG6 6AY (United Kingdom); Karatzas, L S, E-mail: s.hadjiloucas@reading.ac.u [Temasek Polytechnic, School of Engineering, 21 Tampines Avenue 1, Singapore, 529757 (Singapore)

    2009-07-01

    Current limitations in piezoelectric and electrostatic transducers are discussed. A force-feedback electrostatic transducer capable of operating at bandwidths up to 20 kHz is described. Advantages of the proposed design are a linearised operation which simplifies the feedback control aspects and robustness of the performance characteristics to environmental perturbations. Applications in nanotechnology, optical sciences and acoustics are discussed.

  16. Operating experience with high beam currents and transient beam loading in the SLC damping rings

    International Nuclear Information System (INIS)

    Minty, M.G.; Akre, R.; Krejcik, P.; Siemann, R.H.

    1995-01-01

    During the 1994 SLC run the nominal operating intensity in the damping rings was raised from 3.5 x 10 10 to greater than 4 x 10 10 particles per bunch (ppb). Stricter regulation of rf system parameters was required to maintain stability of the rf system and particle beam. Improvements were made in the feedback loops which control the cavity amplitude and loading angles. Compensation for beam loading was also required to prevent klystron saturation during repetition rate changes. To minimize the effects of transient loading on the rf system, the gain of the direct rf feedback loop and the loading angles were optimized

  17. Feedback produces divergence from prospect theory in descriptive choice.

    Science.gov (United States)

    Jessup, Ryan K; Bishara, Anthony J; Busemeyer, Jerome R

    2008-10-01

    A recent study demonstrated that individuals making experience-based choices underweight small probabilities, in contrast to the overweighting observed in a typical descriptive paradigm. We tested whether trial-by-trial feedback in a repeated descriptive paradigm would engender choices more correspondent with experiential or descriptive paradigms. The results of a repeated gambling task indicated that individuals receiving feedback underweighted small probabilities, relative to their no-feedback counterparts. These results implicate feedback as a critical component during the decision-making process, even in the presence of fully specified descriptive information. A model comparison at the individual-subject level suggested that feedback drove individuals' decision weights toward objective probability weighting.

  18. Can false memories be corrected by feedback in the DRM paradigm?

    Science.gov (United States)

    McConnell, Melissa D; Hunt, R Reed

    2007-07-01

    Normal processes of comprehension frequently yield false memories as an unwanted by-product. The simple paradigm now known as the Deese/Roediger-McDermott (DRM) paradigm takes advantage of this fact and has been used to reliably produce false memory for laboratory study. Among the findings from past research is the difficulty of preventing false memories in this paradigm. The purpose of the present experiments was to examine the effectiveness of feedback in correcting false memories. Two experiments were conducted, in which participants recalled DRM lists and either received feedback on their performance or did not. A subsequent recall test was administered to assess the effect of feedback. The results showed promising effects of feedback: Feedback enhanced both error correction and the propagation of correct recall. The data replicated other data of studies that have shown substantial error perseveration following feedback. These data also provide new information on the occurrence of errors following feedback. The results are discussed in terms of the activation-monitoring theory of false memory.

  19. Instructor feedback versus no instructor feedback on performance in a laparoscopic virtual reality simulator

    DEFF Research Database (Denmark)

    Oestergaard, Jeanett; Bjerrum, Flemming; Maagaard, Mathilde

    2012-01-01

    of training. This is mainly due to lack of knowledge concerning the time and human resources needed to train novice surgeons to an adequate level. The purpose of this trial is to investigate the impact of instructor feedback regarding time, repetitions and self-perception when training complex operational...

  20. Safety review of experiments at Albuquerque Operations Office

    International Nuclear Information System (INIS)

    Elliott, K.

    1984-01-01

    The Department of Energy (DOE) Albuquerque Operations Office is responsible for the safety overview of nuclear reactor and critical assembly facilities at Sandia National Laboratories, Los Alamos National Laboratory, and the Rocky Flats Plant. The important safety concerns with these facilities involve the complex experiments that are performed, and that is the area emphasized. A determination is made by the Albuquerque Office (AL) with assistance from DOE/OMA whether or not a proposed experiment is an unreviewed safety question. Meetings are held with the contractor to resolve and clarify questions that are generated during the review of the proposed experiment. The AL safety evaluation report is completed and any recommendations are discussed. Prior to the experiment a preoperational appraisal is performed to assure that personnel, procedures, and equipment are in readiness for operations. During the experiment, any abnormal condition is reviewed in detail to determine any safety concerns

  1. Dynamics of nonlinear feedback control.

    Science.gov (United States)

    Snippe, H P; van Hateren, J H

    2007-05-01

    Feedback control in neural systems is ubiquitous. Here we study the mathematics of nonlinear feedback control. We compare models in which the input is multiplied by a dynamic gain (multiplicative control) with models in which the input is divided by a dynamic attenuation (divisive control). The gain signal (resp. the attenuation signal) is obtained through a concatenation of an instantaneous nonlinearity and a linear low-pass filter operating on the output of the feedback loop. For input steps, the dynamics of gain and attenuation can be very different, depending on the mathematical form of the nonlinearity and the ordering of the nonlinearity and the filtering in the feedback loop. Further, the dynamics of feedback control can be strongly asymmetrical for increment versus decrement steps of the input. Nevertheless, for each of the models studied, the nonlinearity in the feedback loop can be chosen such that immediately after an input step, the dynamics of feedback control is symmetric with respect to increments versus decrements. Finally, we study the dynamics of the output of the control loops and find conditions under which overshoots and undershoots of the output relative to the steady-state output occur when the models are stimulated with low-pass filtered steps. For small steps at the input, overshoots and undershoots of the output do not occur when the filtering in the control path is faster than the low-pass filtering at the input. For large steps at the input, however, results depend on the model, and for some of the models, multiple overshoots and undershoots can occur even with a fast control path.

  2. Building the feedback system of project experience,and expediting the scientific development of nuclear power construction

    International Nuclear Information System (INIS)

    Zhou Hai

    2009-01-01

    In accord with the status of the energy structure and electric power demand in China, the Chinese government has made the strategy of developing nuclear power actively. Confronting the good chance for nuclear power development, the writer takes the Fangjiashan nuclear power project as an example, puts forward a viewpoint that establishing the nuclear power project experience summarization and feedback system is an urgent need for expediting the scientific development of nuclear power. It also demonstrates the necessity, feasibility, and detailed measures, etc. (authors)

  3. Three Principles for the Design of Energy Feedback Visualizations

    DEFF Research Database (Denmark)

    Brewer, Robert S.; Xu, Yongwen; Lee, George E.

    2013-01-01

    , online educational activities, and real-world activities such as workshops and excursions. We describe our experiences developing energy feedback visualizations in the Kukui Cup based on in-lab evaluations and field studies in college residence halls. We learned that energy feedback systems should...

  4. Reliability in mechanics: the application of experience feedback; La fiabilite en mecanique: mise en pratique du retour d`experience

    Energy Technology Data Exchange (ETDEWEB)

    Coudray, R.

    1994-12-31

    After a short overview of the available methods for statistical multi-dimensional studies, an application of these methods is described using the experience feedback of French nuclear reactors. The material studied is the RCV (chemical and volumetric control system) pump of the 900 MW PWR type reactors for which data used in the study are explained. The aim of the study is to show the pertinency of the rate of failures as an indicator of the material aging. This aging is illustrated by the most significant characteristics with an indication of their significance level. The method used combines the results from a mixed classification and those from a multiple correspondences analysis in several steps or evolutions. (J.S.). 8 refs., 6 figs., 3 tabs.

  5. Final installation and testing of the feedback power amplifier for the Scyllac feedback experiment

    International Nuclear Information System (INIS)

    Kutac, K.J.; Kewish, R.W. Jr.; Gribble, R.F.; Rawcliffe, A.S.; Miller, G.; Kemp, E.L.; Bartsch, R.R.

    1975-01-01

    The Scyllac feedback system consists of eight subsystems. The installation and testing of the many components and eight subsystems are described. The eight subsystems are: (1) ML-8618 power amplifiers; (2) dc plate and bias power supplies; (3) ac filament power supplies; (4) position detector and signal processor (intermediate amplifier); (5) l = 0 and l = 2 output load coils; (6) control system and interlock system; (7) computer controlled analog-to-digital transient recorders; and (8) cable distribution and cooling-water supply system

  6. E-Pad: a comfortable electrocutaneous-based tactile feedback display

    Science.gov (United States)

    Wang, Jiabin; Zhao, Lu; Liu, Yue; Wang, Yongtian; Cai, Yi

    2018-01-01

    The devices with touchscreen are becoming more popular recently; however, most of them suffer from the crucial drawbacks of lacking accurate tactile feedback. A novel electrocutaneous-based tactile device with the name of E-pad is proposed to provide a dynamic and static low-voltage feedback for touchscreen. We optimize the key parameters of the output voltage and design custom-made hardwares to guarantee a comfortable user experience. Users could move their fingers freely across the touchscreen of the proposed device to really feel virtual objects. Two preliminary experiments are conducted to evaluate the interactive performance of the proposed device and the experimental results show that the proposed device can provide a comfortable and distinct tactile feedback.

  7. Enhancement of vegetation-rainfall feedbacks on the Australian summer monsoon by the Madden-Julian Oscillation

    Science.gov (United States)

    Notaro, Michael

    2018-01-01

    A regional climate modeling analysis of the Australian monsoon system reveals a substantial modulation of vegetation-rainfall feedbacks by the Madden Julian Oscillation (MJO), both of which operate at similar sub-seasonal time scales, as evidence that the intensity of land-atmosphere interactions is sensitive to the background atmospheric state. Based on ensemble experiments with imposed modification of northern Australian leaf area index (LAI), the atmospheric responses to LAI anomalies are composited for negative and positive modes of the propagating MJO. In the regional climate model (RCM), northern Australian vegetation feedbacks are characterized by evapotranspiration (ET)-driven rainfall responses, with the moisture feedback mechanism dominating over albedo and roughness feedback mechanisms. During November-April, both Tropical Rainfall Measuring Mission and RCM data reveal MJO's pronounced influence on rainfall patterns across northern Australia, tropical Indian Ocean, Timor Sea, Arafura Sea, and Gulf of Carpentaria, with the MJO dominating over vegetation feedbacks in terms of regulating monsoon rainfall variability. Convectively-active MJO phases support an enhancement of positive vegetation feedbacks on monsoon rainfall. While the MJO imposes minimal regulation of ET responses to LAI anomalies, the vegetation feedback-induced responses in precipitable water, cloud water, and rainfall are greatly enhanced during convectively-active MJO phases over northern Australia, which are characterized by intense low-level convergence and efficient precipitable water conversion. The sub-seasonal response of vegetation-rainfall feedback intensity to the MJO is complex, with significant enhancement of rainfall responses to LAI anomalies in February during convectively-active MJO phases compared to minimal modulation by the MJO during prior and subsequent calendar months.

  8. An Anatomy of Feedback: A Phenomenographic Investigation of Undergraduate Students' Conceptions of Feedback

    Science.gov (United States)

    McLean, Angela J.; Bond, Carol H.; Nicholson, Helen D.

    2015-01-01

    The aim of this research was to investigate how undergraduate students conceptualise feedback, and compare this with research into conceptions of teaching and learning related phenomena in higher education. Using a phenomenographic approach, 28 physiotherapy students in New Zealand were interviewed about their experiences. Data analysis resulted…

  9. Operation experience of the Indonesian multipurpose research reactor RSG-GAS

    Energy Technology Data Exchange (ETDEWEB)

    Hastowo, Hudi; Tarigan, Alim [Multipurpose Reactor Center, National Nuclear Energy Agency of the Republic of Indonesia (PRSG-BATAN), Kawasan PUSPIPTEK Serpong, Tangerang (Indonesia)

    1999-08-01

    RSG-GAS is a multipurpose research reactor with nominal power of 30 MW, operated by BATAN since 1987. The reactor is an open pool type, cooled and moderated with light water, using the LEU-MTR fuel element in the form of U{sub 3}O{sub 8}-Al dispersion. Up to know, the reactor have been operated around 30,000 hours to serve the user. The reactor have been utilized to produce radioisotope, neutron beam experiments, irradiation of fuel element and its structural material, and reactor physics experiments. This report will explain in further detail concerning operational experience of this reactor, i.e. reactor operation data, reactor utilization, research program, technical problems and it solutions, plant modification and improvement, and development plan to enhance better reactor operation performance and its utilization. (author)

  10. Operation experience of the Indonesian multipurpose research reactor RSG-GAS

    International Nuclear Information System (INIS)

    Hastowo, Hudi; Tarigan, Alim

    1999-01-01

    RSG-GAS is a multipurpose research reactor with nominal power of 30 MW, operated by BATAN since 1987. The reactor is an open pool type, cooled and moderated with light water, using the LEU-MTR fuel element in the form of U 3 O 8 -Al dispersion. Up to know, the reactor have been operated around 30,000 hours to serve the user. The reactor have been utilized to produce radioisotope, neutron beam experiments, irradiation of fuel element and its structural material, and reactor physics experiments. This report will explain in further detail concerning operational experience of this reactor, i.e. reactor operation data, reactor utilization, research program, technical problems and it solutions, plant modification and improvement, and development plan to enhance better reactor operation performance and its utilization. (author)

  11. A durability analysis of the Cascad facility based on feedback obtained after 10 years of operation

    International Nuclear Information System (INIS)

    Samoel, R.; Canas, D.; Henry, H.; Battesti, P.

    1999-01-01

    The CASCAD facility at the nuclear research centre in Cadarache is a dry storage facility for spent fuel that has been placed in a vault. Feedback on its design and performance after 10 years of operation was obtained in order to identify the factors limiting its life time. This assessment corresponds to a durability analysis based on a combination of dependability methods. This is a critical analysis identifying the risks involving failure of the components when they are subjected to internal and external disturbances (aging, technology obsolescence, etc.). The measures to be implemented to extend the life time of the facility are subsequently enumerated. A proposed synthesis or 'logic diagram' of the analysis is also presented. (authors)

  12. Operational experience with CMS Tier-2 sites

    International Nuclear Information System (INIS)

    Gonzalez Caballero, I

    2010-01-01

    In the CMS computing model, more than one third of the computing resources are located at Tier-2 sites, which are distributed across the countries in the collaboration. These sites are the primary platform for user analyses; they host datasets that are created at Tier-1 sites, and users from all CMS institutes submit analysis jobs that run on those data through grid interfaces. They are also the primary resource for the production of large simulation samples for general use in the experiment. As a result, Tier-2 sites have an interesting mix of organized experiment-controlled activities and chaotic user-controlled activities. CMS currently operates about 40 Tier-2 sites in 22 countries, making the sites a far-flung computational and social network. We describe our operational experience with the sites, touching on our achievements, the lessons learned, and the challenges for the future.

  13. Design of analog pixels front-end active feedback

    Science.gov (United States)

    Kmon, P.; Kadlubowski, L. A.; Kaczmarczyk, P.

    2018-01-01

    The paper presents the design of the active feedback used in a charge-sensitive amplifier. The predominant advantages of the presented circuit are its ability for setting wide range of pulse-time widths, small silicon area occupation and low power consumption. The feedback also allows sensor leakage current compensation and, thanks to an additional DC amplifier, it minimizes the output DC voltage variations, which is especially important in the DC coupled recording chain and for processes with limited supply voltage. The paper provides feedback description and its operation principle. The proposed circuit was designed in the CMOS 130nm technology.

  14. Vacuum system operating experience review for fusion applications

    International Nuclear Information System (INIS)

    Cadwallader, L.C.

    1994-03-01

    This report presents a review of vacuum system operating experiences from particle accelerator, fusion experiment, space simulation chamber, and other applications. Safety relevant operating experiences and accident information are discussed. Quantitative order-of-magnitude estimates of vacuum system component failure rates and accident initiating event frequencies are presented for use in risk assessment, reliability, and availability studies. Safety concerns with vacuum systems are discussed, including personnel safety, foreign material intrusion, and factors relevant to vacuum systems being the primary confinement boundary for tritium and activated dusts. This information should be useful to fusion system designers and safety analysts, such as the team working on the Engineering Design Activities for the International Thermonuclear Experimental Reactor

  15. Feedback Valence Affects Auditory Perceptual Learning Independently of Feedback Probability

    Science.gov (United States)

    Amitay, Sygal; Moore, David R.; Molloy, Katharine; Halliday, Lorna F.

    2015-01-01

    Previous studies have suggested that negative feedback is more effective in driving learning than positive feedback. We investigated the effect on learning of providing varying amounts of negative and positive feedback while listeners attempted to discriminate between three identical tones; an impossible task that nevertheless produces robust learning. Four feedback conditions were compared during training: 90% positive feedback or 10% negative feedback informed the participants that they were doing equally well, while 10% positive or 90% negative feedback informed them they were doing equally badly. In all conditions the feedback was random in relation to the listeners’ responses (because the task was to discriminate three identical tones), yet both the valence (negative vs. positive) and the probability of feedback (10% vs. 90%) affected learning. Feedback that informed listeners they were doing badly resulted in better post-training performance than feedback that informed them they were doing well, independent of valence. In addition, positive feedback during training resulted in better post-training performance than negative feedback, but only positive feedback indicating listeners were doing badly on the task resulted in learning. As we have previously speculated, feedback that better reflected the difficulty of the task was more effective in driving learning than feedback that suggested performance was better than it should have been given perceived task difficulty. But contrary to expectations, positive feedback was more effective than negative feedback in driving learning. Feedback thus had two separable effects on learning: feedback valence affected motivation on a subjectively difficult task, and learning occurred only when feedback probability reflected the subjective difficulty. To optimize learning, training programs need to take into consideration both feedback valence and probability. PMID:25946173

  16. A perspective on the role and utility of haptic feedback in laparoscopic skills training.

    Science.gov (United States)

    Singapogu, Ravikiran; Burg, Timothy; Burg, Karen J L; Smith, Dane E; Eckenrode, Amanda H

    2014-01-01

    Laparoscopic surgery is a minimally invasive surgical technique with significant potential benefits to the patient, including shorter recovery time, less scarring, and decreased costs. There is a growing need to teach surgical trainees this emerging surgical technique. Simulators, ranging from simple "box" trainers to complex virtual reality (VR) trainers, have emerged as the most promising method for teaching basic laparoscopic surgical skills. Current box trainers require oversight from an expert surgeon for both training and assessing skills. VR trainers decrease the dependence on expert teachers during training by providing objective, real-time feedback and automatic skills evaluation. However, current VR trainers generally have limited credibility as a means to prepare new surgeons and have often fallen short of educators' expectations. Several researchers have speculated that the missing component in modern VR trainers is haptic feedback, which refers to the range of touch sensations encountered during surgery. These force types and ranges need to be adequately rendered by simulators for a more complete training experience. This article presents a perspective of the role and utility of haptic feedback during laparoscopic surgery and laparoscopic skills training by detailing the ranges and types of haptic sensations felt by the operating surgeon, along with quantitative studies of how this feedback is used. Further, a number of research studies that have documented human performance effects as a result of the presence of haptic feedback are critically reviewed. Finally, key research directions in using haptic feedback for laparoscopy training simulators are identified.

  17. Spacelab operations planning. [ground handling, launch, flight and experiments

    Science.gov (United States)

    Lee, T. J.

    1976-01-01

    The paper reviews NASA planning in the fields of ground, launch and flight operations and experiment integration to effectively operate Spacelab. Payload mission planning is discussed taking consideration of orbital analysis and the mission of a multiuser payload which may be either single or multidiscipline. Payload analytical integration - as active process of analyses to ensure that the experiment payload is compatible to the mission objectives and profile ground and flight operations and that the resource demands upon Spacelab can be satisfied - is considered. Software integration is touched upon and the major integration levels in ground operational processing of Spacelab and its experimental payloads are examined. Flight operations, encompassing the operation of the Space Transportation System and the payload, are discussed as are the initial Spacelab missions. Charts and diagrams are presented illustrating the various planning areas.

  18. Benefits of Subliminal Feedback Loops in Human-Computer Interaction

    OpenAIRE

    Walter Ritter

    2011-01-01

    A lot of efforts have been directed to enriching human-computer interaction to make the user experience more pleasing or efficient. In this paper, we briefly present work in the fields of subliminal perception and affective computing, before we outline a new approach to add analog communication channels to the human-computer interaction experience. In this approach, in addition to symbolic predefined mappings of input to output, a subliminal feedback loop is used that provides feedback in evo...

  19. Tunable and broadband microwave frequency combs based on a semiconductor laser with incoherent optical feedback

    International Nuclear Information System (INIS)

    Zhao Mao-Rong; Wu Zheng-Mao; Deng Tao; Zhou Zhen-Li; Xia Guang-Qiong

    2015-01-01

    Based on a semiconductor laser (SL) with incoherent optical feedback, a novel all-optical scheme for generating tunable and broadband microwave frequency combs (MFCs) is proposed and investigated numerically. The results show that, under suitable operation parameters, the SL with incoherent optical feedback can be driven to operate at a regular pulsing state, and the generated MFCs have bandwidths broader than 40 GHz within a 10 dB amplitude variation. For a fixed bias current, the line spacing (or repetition frequency) of the MFCs can be easily tuned by varying the feedback delay time and the feedback strength, and the tuning range of the line spacing increases with the increase in the bias current. The linewidth of the MFCs is sensitive to the variation of the feedback delay time and the feedback strength, and a linewidth of tens of KHz can be achieved through finely adjusting the feedback delay time and the feedback strength. In addition, mappings of amplitude variation, repetition frequency, and linewidth of MFCs in the parameter space of the feedback delay time and the feedback strength are presented. (paper)

  20. Operation experience with elevated ammonia

    International Nuclear Information System (INIS)

    Vankova, Katerina; Kysela, Jan; Malac, Miroslav; Petrecky, Igor; Svarc, Vladimir

    2011-01-01

    The 10 VVER units in the Czech and Slovak Republics are all in very good water chemistry and radiation condition, yet questions have arisen regarding the optimization of cycle chemistry and improved operation in these units. To address these issues, a comprehensive experimental program for different water chemistries of the primary circuit was carried out at the Rez Nuclear Research Institute, Czech Republic, with the goal of judging the influence of various water chemistries on radiation build-up. Four types of water chemistries were compared: standard VVER water chemistry (in common use), direct hydrogen dosing without ammonia, standard VVER water chemistry with elevated ammonia levels, and zinc dosing to standard VVER water chemistry. The test results showed that the types of water chemistry other than the common one have benefits for the operation of the nuclear power plant (NPP) primary circuit. Operation experience with elevated ammonia at NPP Dukovany Units 3 and 4 is presented which validates the experimental results, demonstrating improved corrosion product volume activity. (orig.)