  1. Feasibility study report for Operable Unit 4: Volume 2

    International Nuclear Information System (INIS)

    1994-02-01

    This report documents the Feasibility Study (FS) phase of the Fernald Environmental Management Project (FEMP) Operable Unit 4 Remedial Investigation/Feasibility Study (RI/FS) Program. The FEMP, formerly known as the Feed Materials Production Center (FMPC), is a US Department of Energy (DOE) facility that operated from 1952 to 1989. The facility's primarily function was to provide high purity uranium metal products to support United States defense programs. Production operations were suspended in 1989 to focus on environmental restoration and waste management activities at the facility. The RI/FS is being conducted pursuant to the terms of a Consent Agreement between DOE and the US Environmental Protection Agency (EPA) under Sections 120 and 106(a) of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended. The Ohio Environmental Protection Agency (OEPA) is also participating in the RI/FS process at the FEMP through direct involvement in program review meetings and technical review of project documentation. The objective of the RI/FS process is to gather information to support an informed risk management decision regarding which remedy appears to be the most appropriate action for addressing the environmental concerns identified at the FEMP. This volume contains appendices A--E

  2. Feasibility study report for Operable Unit 4: Volume 1

    International Nuclear Information System (INIS)

    1994-02-01

    This report documents the Feasibility Study (FS) phase of the Fernald Environmental Management Project (FEMP) Operable Unit 4 Remedial Investigation/Feasibility Study (RI/FS) Program. The FEMP, formerly known as the Feed Materials Production Center (FMPC), is a US Department of Energy (DOE) facility that operated from 1952 to 1989. The facility's primarily function was to provide high purity uranium metal products to support United States defense programs. Production operations were suspended in 1989 to focus on environmental restoration and waste management activities at the facility. The RI/FS is being conducted pursuant to the terms of a Consent Agreement between DOE and the US Environmental Protection Agency (EPA) under Sections 120 and 106(a) of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended. The Ohio Environmental Protection Agency (OEPA) is also participating in the RI/FS process at the FEMP through direct involvement in program review meetings and technical review of project documentation. The objective of the RI/FS process is to gather information to support an informed risk management decision regarding which remedy appears to be the most appropriate action for addressing the environmental concerns identified at the FEMP

  3. Basewide Groundwater Operable Unit. Groundwater Operable Unit Remedial Investigation/Feasibility Study Report. Volume 2

    Science.gov (United States)

    1994-06-01

    Waters Plan Protection of Aquatic Life Freshwater Aquatic ULie Protection Freshwater Freshwater 1-Hour CopudAcute Chronic Average 4-Day...2 of 3 ARARs TB~s Clean Water Act Ambient Water Quality Criteria Inland Surface Waters Plan Protection of Aquatic Life Freshwater Aquatic Life...as a drinking water source. Response: The Air Force concurs with the establishment of a 106 risk target volume as the goal of the interim

  4. Basewide Groundwater Operable Unit. Groundwater Operable Unit Remedial Investigation/Feasibility Study Report. Volume 1

    Science.gov (United States)

    1994-06-01

    units would be reused in the remedy. Contingency measures to be included in the remedy are potential metals removal prior to water end use, potential...onbase reuse of a portion of the water, and wellhead treatment on offbase supply wells. The contingency measures will only be implemented if necessary...94 LEGEND Ouatmar aluvi dposts agua Frmaion(cosoldatd aluval epoits W iead rdetilnsMhte omtin(neitccnlmeae ansoe9ndkeca F 70 Quvatei-lernayalvu e pk

  5. No Correlation Between Work-Hours and Operative Volumes--A Comparison Between United States and Danish Operative Volumes Achieved During Surgical Residency.

    Science.gov (United States)

    Kjærgaard, Jane; Sillesen, Martin; Beier-Holgersen, Randi

    2016-01-01

    Since 2003, United States residents have been limited to an 80-hour workweek. This has prompted concerns of reduced educational quality, especially inadequate operating exposure. In contrast, the Danish surgical specialty-training program mandates a cap on working hours of 37 per week. We hypothesize that there is no direct correlation between work-hours and operative volume achieved during surgical residency. To test the hypothesis, we compare Danish and US operative volumes achieved during surgical residency training. Retrospective comparative study. The data from the US population was extracted from the Accreditation Council for Graduate Medical Education database for General Surgery residents from 2012 to 2013. For Danish residents, a questionnaire with case categories matching the Accreditation Council for Graduate Medical Education categories were sent to all Danish surgeons graduating the national surgical residency program in 2012 or 2013, 54 in total. In all, 30 graduated residents (55%) responded to the Danish survey. We found no significant differences in mean total major procedures (1002.4 vs 976.9, p = 0.28) performed during residency training, but comparing average major procedures per year, the US residents achieve significantly more (132.3 vs 195.4, p work-hours and operative volumes achievable. Factors other than work-hours seem to effect on operative volumes achieved during training. Copyright © 2016 Association of Program Directors in Surgery. Published by Elsevier Inc. All rights reserved.

  6. Phase I remedial investigation report for the 300-FF-5 operable unit, Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-01-01

    The focus of this remedial investigation (RI) is the 300-FF-5 operable unit, one of five operable units associated with the 300 Area aggregate of the U.S. Department of Energy`s (DOE`s) Hanford Site. The 300-FF-5 operable unit is a groundwater operable unit beneath the 300-FF-1, 300-FF-2, and 300-FF-3 source operable units. This operable unit was designated to include all contamination detected in the groundwater and sediments below the water table that emanates from the 300-FF-1, 300-FF-2, and 300-FF-3 operable units (DOE-RL 1990a). In November 1989, the U.S. Environmental Protection Agency (EPA) placed the 300 Area on the National Priorities List (NPL) contained within Appendix B of the National Oil and Hazardous Substance Pollution Contingency Plan (NCP, 53 FR 51391 et seq.). The EPA took this action pursuant to their authority under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA, 42 USC 9601 et seq.). The DOE Richland Operations Office (DOE-RL), the EPA and Washington Department of Ecology (Ecology) issued the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement), in May 1989 (Ecology et al. 1992, Rev. 2). This agreement, among other matters, governs all CERCLA efforts at the Hanford Site. In June 1990, a remedial investigation/feasibility study (RI/FS) workplan for the 300-FF-5 operable unit was issued pursuant to the Tri-Party Agreement.

  7. Phase I remedial investigation report for the 300-FF-5 operable unit, Volume 1

    International Nuclear Information System (INIS)

    1994-01-01

    The focus of this remedial investigation (RI) is the 300-FF-5 operable unit, one of five operable units associated with the 300 Area aggregate of the U.S. Department of Energy's (DOE's) Hanford Site. The 300-FF-5 operable unit is a groundwater operable unit beneath the 300-FF-1, 300-FF-2, and 300-FF-3 source operable units. This operable unit was designated to include all contamination detected in the groundwater and sediments below the water table that emanates from the 300-FF-1, 300-FF-2, and 300-FF-3 operable units (DOE-RL 1990a). In November 1989, the U.S. Environmental Protection Agency (EPA) placed the 300 Area on the National Priorities List (NPL) contained within Appendix B of the National Oil and Hazardous Substance Pollution Contingency Plan (NCP, 53 FR 51391 et seq.). The EPA took this action pursuant to their authority under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA, 42 USC 9601 et seq.). The DOE Richland Operations Office (DOE-RL), the EPA and Washington Department of Ecology (Ecology) issued the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement), in May 1989 (Ecology et al. 1992, Rev. 2). This agreement, among other matters, governs all CERCLA efforts at the Hanford Site. In June 1990, a remedial investigation/feasibility study (RI/FS) workplan for the 300-FF-5 operable unit was issued pursuant to the Tri-Party Agreement

  8. Phase 1 remedial investigation report for 200-BP-1 operable unit. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-01

    The US Department of Energy (DOE) Hanford Site, in Washington State is organized into numerically designated operational areas including the 100, 200, 300, 400, 600, and 1100 Areas. The US Environmental Protection Agency (EPA), in November 1989 included the 200 Areas of the Hanford Site on the National Priority List (NPL) under the Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA). Inclusion on the NPL initiated the remedial investigation (RD process for the 200-BP-1 operable unit. These efforts are being addressed through the Hanford Federal Facility Agreement and Consent Order (Ecology et al. 1989) which was negotiated and approved by the DOE, the EPA, and the State of Washington Department of Ecology (Ecology) in May 1989. This agreement, known as the Tri-Party Agreement, governs all CERCLA efforts at Hanford. In March of 1990, the Department of Energy, Richland Operations (DOE-RL) issued a Remedial Investigation/Feasibility Study (RI/FS) work plan (DOE-RL 1990a) for the 200-BP-1 operable unit. The work plan initiated the first phase of site characterization activities associated with the 200-BP-1 operable unit. The purpose of the 200-BP-1 operable unit RI is to gather and develop the necessary information to adequately understand the risks to human health and the environment posed by the site and to support the development and analysis of remedial alternatives during the FS. The RI analysis will, in turn, be used by Tri-Party Agreement signatories to make a risk-management-based selection of remedies for the releases of hazardous substances that have occurred from the 200-BP-1 operable unit.

  9. Remedial investigation/feasibility study of the Clinch River/Poplar Creek operable unit. Volume 5

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    This volume is in support of the findings of an investigation into contamination of the Clinch River and Poplar Creek near the Oak Ridge Reservation (for more than 50 years, various hazardous and radioactive substances have been released to the environment as a result of operations and waste management activities there). It addresses the quality assurance objectives for measuring the data, presents selected historical data, contains data from several discrete water characterization studies, provides data supporting the sediment characterization, and contains data related to several biota characterization studies.

  10. Outcomes of PCI in Relation to Procedural Characteristics and Operator Volumes in the United States.

    Science.gov (United States)

    Fanaroff, Alexander C; Zakroysky, Pearl; Dai, David; Wojdyla, Daniel; Sherwood, Matthew W; Roe, Matthew T; Wang, Tracy Y; Peterson, Eric D; Gurm, Hitinder S; Cohen, Mauricio G; Messenger, John C; Rao, Sunil V

    2017-06-20

    Professional guidelines have reduced the recommended minimum number to an average of 50 percutaneous coronary intervention (PCI) procedures performed annually by each operator. Operator volume patterns and associated outcomes since this change are unknown. The authors describe herein PCI operator procedure volumes; characteristics of low-, intermediate-, and high-volume operators; and the relationship between operator volume and clinical outcomes in a large, contemporary, nationwide sample. Using data from the National Cardiovascular Data Registry collected between July 1, 2009, and March 31, 2015, we examined operator annual PCI volume. We divided operators into low- (100 PCIs per year) volume groups, and determined the adjusted association between annual PCI volume and in-hospital outcomes, including mortality. The median annual number of procedures performed per operator was 59; 44% of operators performed PCI procedures per year. Low-volume operators more frequently performed emergency and primary PCI procedures and practiced at hospitals with lower annual PCI volumes. Unadjusted in-hospital mortality was 1.86% for low-volume operators, 1.73% for intermediate-volume operators, and 1.48% for high-volume operators. The adjusted risk of in-hospital mortality was higher for PCI procedures performed by low- and intermediate-volume operators compared with those performed by high-volume operators (adjusted odds ratio: 1.16 for low versus high; adjusted odds ratio: 1.05 for intermediate vs. high volume) as was the risk for new dialysis post PCI. No volume relationship was observed for post-PCI bleeding. Many PCI operators in the United States are performing fewer than the recommended number of PCI procedures annually. Although absolute risk differences are small and may be partially explained by unmeasured differences in case mix between operators, there remains an inverse relationship between PCI operator volume and in-hospital mortality that persisted in risk

  11. Evaluation of potential severe accidents during low power and shutdown operations at Surry: Unit 1, Volume 1

    International Nuclear Information System (INIS)

    Chu, T.L.; Pratt, W.T.

    1995-10-01

    This document contains a summarization of the results and insights from the Level 1 accident sequence analyses of internally initiated events, internally initiated fire and flood events, seismically initiated events, and the Level 2/3 risk analysis of internally initiated events (excluding fire and flood) for Surry, Unit 1. The analysis was confined to mid-loop operation, which can occur during three plant operational states (identified as POSs R6 and R10 during a refueling outage, and POS D6 during drained maintenance). The report summarizes the Level 1 information contained in Volumes 2--5 and the Level 2/3 information contained in Volume 6 of NUREG/CR-6144

  12. Evaluation of potential severe accidents during low power and shutdown operations at Surry: Unit 1, Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Chu, T.L.; Pratt, W.T. [eds.; Musicki, Z. [Brookhaven National Lab., Upton, NY (United States)

    1995-10-01

    This document contains a summarization of the results and insights from the Level 1 accident sequence analyses of internally initiated events, internally initiated fire and flood events, seismically initiated events, and the Level 2/3 risk analysis of internally initiated events (excluding fire and flood) for Surry, Unit 1. The analysis was confined to mid-loop operation, which can occur during three plant operational states (identified as POSs R6 and R10 during a refueling outage, and POS D6 during drained maintenance). The report summarizes the Level 1 information contained in Volumes 2--5 and the Level 2/3 information contained in Volume 6 of NUREG/CR-6144.

  13. Operable Unit Boundaries

    Data.gov (United States)

    U.S. Environmental Protection Agency — This dataset consists of operable unit data from multiple Superfund sites in U.S. EPA Region 8. These data were acquired from multiple sources at different times and...

  14. Operational Waste Volume Projection

    Energy Technology Data Exchange (ETDEWEB)

    STRODE, J.N.

    2000-08-28

    Waste receipts to the double-shell tank system are analyzed and wastes through the year 2015 are projected based on generation trends of the past 12 months. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement. Assumptions were current as of June. 2000.

  15. Operational waste volume projection

    International Nuclear Information System (INIS)

    Koreski, G.M.; Strode, J.N.

    1995-06-01

    Waste receipts to the double-shell tank system are analyzed and wastes through the year 2015 are projected based on generation trends of the past 12 months. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the tri-party agreement. Assumptions are current as of June 1995

  16. Operational Waste Volume Projection

    International Nuclear Information System (INIS)

    STRODE, J.N.

    2000-01-01

    Waste receipts to the double-shell tank system are analyzed and wastes through the year 2015 are projected based on generation trends of the past 12 months. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement. Assumptions were current as of June. 2000

  17. Remedial investigation/feasibility study of the Clinch River/Poplar Creek operable unit. Volume 1: Main text

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-06-01

    This report presents the findings of an investigation into contamination of the Clinch River and Poplar Creek near the US Department of Energy`s (DOE`s) Oak Ridge Reservation (ORR) in eastern Tennessee. For more than 50 years, various hazardous and radioactive substances have been released to the environment as a result of operations and waste management activities at the ORR. In 1989, the ORR was placed on the National Priorities List (NPL), established and maintained under the federal Comprehensive environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under CERCLA, NPL sites must be investigated to determine the nature and extent of contamination at the site, assess the risk to human health and the environment posed by the site, and, if necessary, identify feasible remedial alternatives that could be used to clean the site and reduce risk. To facilitate the overall environmental restoration effort at the ORR, CERCLA activities are being implemented individually as distinct operable units (OUs). This document is the combined Remedial Investigation and Feasibility Study Report for the Clinch River/Poplar Creek OU.

  18. Remedial investigation/feasibility study for the Clinch River/Poplar Creek operable unit. Volume 3. Appendix E

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    This document contains Appendix E: Toxicity Information and Uncertainty Analysis, description of methods, from the combined Remedial Investigation/Feasibility Study Report for the Clinch River/Poplar Crack (CR/PC) Operable Unit (OU). The CR/PC OU is located in Anderson and Roane Counties, Tennessee and consists of the Clinch River and several of its embayments in Melton Hill and Watts Bar Reservoirs. These waters have received hazardous substances released over a period of 50 years from the US Department of Energy`s Oak Ridge Reservation (ORR), a National Priority List site established under the Comprehensive Environmental Response, Compensation, and Liability Act. A remedial investigation has been conducted to determine the current nature and extent of any contamination and to assess the resulting risk to human health and the environment. The feasibility study evaluates remedial action alternatives to identify any that are feasible for implementation and that would effectively reduce risk. Historical studies had indicated that current problems would likely include {sup 137}Cs in sediment of the Clinch River, mercury in sediment and fish of Poplar Creek and PCBs and pesticides in fish from throughout the OU. Peak releases of mercury and {sup 137}Cs occurred over 35 years ago, and current releases are low. Past releases of PCBs from the ORR are poorly quantified, and current releases are difficult to quantify because levels are so low. The site characterization focused on contaminants in surface water, sediment, and biota. Contaminants in surface water were all found to be below Ambient Water Quality Criteria. Other findings included the following: elevated metals including cesium 137 and mercury in McCoy Branch sediments; PCBs and chlordane elevated in several fish species, presenting the only major human health risk, significant ecological risks in Poplar Creek but not in the Clinch River.

  19. Remedial investigation/feasibility study for the Clinch River/Poplar Creek operable unit. Volume 4. Appendix F

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    This section contains ecotoxicological profiles for the COPECs for the combined Remedial Investigation/Feasibility Study Report for the Clinch River/Poplar Crack (CR/PC) Operable Unit (OU). The ecotoxicological information is presented for only those endpoints for which the chemicals are COPECs. The CR/PC OU is located in Anderson and Roane Counties, Tennessee and consists of the Clinch River and several of its embayments in Melton Hill and Watts Bar Reservoirs. These waters have received hazardous substances released over a period of 50 years from the US Department of Energy`s Oak Ridge Reservation (ORR), a National Priority List site established under the Comprehensive Environmental Response, Compensation, and Liability Act. A remedial investigation has been conducted to determine the current nature and extent of any contamination and to assess the resulting risk to human health and the environment. The feasibility study evaluates remedial action alternatives to identify any that are feasible for implementation and that would effectively reduce risk. Historical studies had indicated that current problems would likely include {sup 137}Cs in sediment of the Clinch River, mercury in sediment and fish of Poplar Creek and PCBs and pesticides in fish from throughout the OU. Peak releases of mercury and {sup 137}Cs occurred over 35 years ago, and current releases are low. Past releases of PCBs from the ORR are poorly quantified, and current releases are difficult to quantify because levels are so low. The site characterization focused on contaminants in surface water, sediment, and biota. Contaminants in surface water were all found to be below Ambient Water Quality Criteria. Other findings included the following: elevated metals including cesium 137 and mercury in McCoy Branch sediments; PCBs and chlordane elevated in several fish species, presenting the only major human health risk, significant ecological risks in Poplar Creek but not in the Clinch River.

  20. Remedial investigation/feasibility study for the Clinch River/Poplar Creek operable unit. Volume 4. Appendix F

    International Nuclear Information System (INIS)

    1995-09-01

    This section contains ecotoxicological profiles for the COPECs for the combined Remedial Investigation/Feasibility Study Report for the Clinch River/Poplar Crack (CR/PC) Operable Unit (OU). The ecotoxicological information is presented for only those endpoints for which the chemicals are COPECs. The CR/PC OU is located in Anderson and Roane Counties, Tennessee and consists of the Clinch River and several of its embayments in Melton Hill and Watts Bar Reservoirs. These waters have received hazardous substances released over a period of 50 years from the US Department of Energy's Oak Ridge Reservation (ORR), a National Priority List site established under the Comprehensive Environmental Response, Compensation, and Liability Act. A remedial investigation has been conducted to determine the current nature and extent of any contamination and to assess the resulting risk to human health and the environment. The feasibility study evaluates remedial action alternatives to identify any that are feasible for implementation and that would effectively reduce risk. Historical studies had indicated that current problems would likely include 137 Cs in sediment of the Clinch River, mercury in sediment and fish of Poplar Creek and PCBs and pesticides in fish from throughout the OU. Peak releases of mercury and 137 Cs occurred over 35 years ago, and current releases are low. Past releases of PCBs from the ORR are poorly quantified, and current releases are difficult to quantify because levels are so low. The site characterization focused on contaminants in surface water, sediment, and biota. Contaminants in surface water were all found to be below Ambient Water Quality Criteria. Other findings included the following: elevated metals including cesium 137 and mercury in McCoy Branch sediments; PCBs and chlordane elevated in several fish species, presenting the only major human health risk, significant ecological risks in Poplar Creek but not in the Clinch River

  1. Remedial investigation/feasibility study of the Clinch River/Poplar Creek operable unit. Volume 1, main text

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    This document is the combined Remedial Investigation/Feasibility Study (RI/FS) Report for the Clinch River/Poplar Creek Operable Unit (CR/PC OU), an off-site OU associated with environmental restoration activities at the U.S. Department of Energy (DOE) Oak Ridge Reservation (ORR). As a result of past, present, and potential future releases of hazardous substances into the environment, the ORR was placed on the National Priorities List in December 1989 (54 FR 48184). Sites on this list must be investigated for possible remedial action, as required by the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA, 42 U.S.C. 9601, et seq.). This report documents the findings of the remedial investigation of this OU and the feasibility of potential remedial action alternatives. These studies are authorized by Sect. 117 of CERCLA and were conducted in accordance with the requirements of the National Contingency Plan (40 CFR Part 300). DOE, the U.S. Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC) have entered into a Federal Facility Agreement (FFA), as authorized by Sect. 120 of CERCLA and Sects. 3008(h) and 6001 of the Resource Conservation and Recovery Act (RCRA) (42 U.S.C. 6901, et seq.). The purpose of this agreement is to ensure a coordinated and effective response for all environmental restoration activities occurring at the ORR. In addition to other responsibilities, the FFA parties mutually define the OU boundaries, set remediation priorities, establish remedial investigation priorities and strategies, and identify and select remedial actions. A copy of this FFA is available from the DOE Information Resource Center in Oak Ridge, Tennessee.

  2. Remedial investigation/feasibility study for the Clinch River/Poplar Creek operable unit. Volume 1. Main text

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    This is the combined Remedial Investigation/Feasibility Study Report for the Clinch River/Poplar Crack (CR/PC) Operable Unit (OU). The CR/PC OU is located in Anderson and Roane Counties, Tennessee and consists of the Clinch River and several of its embayments in Melton Hill and Watts Bar Reservoirs. These waters have received hazardous substances released over a period of 50 years from the US Department of Energy`s Oak Ridge Reservation (ORR), a National Priority List site established under the Comprehensive Environmental Response, Compensation, and Liability Act. A remedial investigation has been conducted to determine the current nature and extent of any contamination and to assess the resulting risk to human health and the environment. The feasibility study evaluates remedial action alternatives to identify any that are feasible for implementation and that would effectively reduce risk. Historical studies had indicated that current problems would likely include {sup 137}Cs in sediment of the Clinch River, mercury in sediment and fish of Poplar Creek and PCBs and pesticides in fish from throughout the OU. Peak releases of mercury and {sup 137}Cs occurred over 35 years ago, and current releases are low. Past releases of PCBs from the ORR are poorly quantified, and current releases are difficult to quantify because levels are so low. The site characterization focused on contaminants in surface water, sediment, and biota. Contaminants in surface water were all found to be below Ambient Water Quality Criteria. Other findings included the following: elevated metals including cesium 137 and mercury in McCoy Branch sediments; PCBs and chlordane elevated in several fish species, presenting the only major human health risk, significant ecological risks in Poplar Creek but not in the Clinch River.

  3. Remedial investigation/feasibility study for the Clinch River/Poplar Creek operable unit. Volume 3. Appendix E

    International Nuclear Information System (INIS)

    1995-09-01

    This document contains Appendix E: Toxicity Information and Uncertainty Analysis, description of methods, from the combined Remedial Investigation/Feasibility Study Report for the Clinch River/Poplar Crack (CR/PC) Operable Unit (OU). The CR/PC OU is located in Anderson and Roane Counties, Tennessee and consists of the Clinch River and several of its embayments in Melton Hill and Watts Bar Reservoirs. These waters have received hazardous substances released over a period of 50 years from the US Department of Energy's Oak Ridge Reservation (ORR), a National Priority List site established under the Comprehensive Environmental Response, Compensation, and Liability Act. A remedial investigation has been conducted to determine the current nature and extent of any contamination and to assess the resulting risk to human health and the environment. The feasibility study evaluates remedial action alternatives to identify any that are feasible for implementation and that would effectively reduce risk. Historical studies had indicated that current problems would likely include 137 Cs in sediment of the Clinch River, mercury in sediment and fish of Poplar Creek and PCBs and pesticides in fish from throughout the OU. Peak releases of mercury and 137 Cs occurred over 35 years ago, and current releases are low. Past releases of PCBs from the ORR are poorly quantified, and current releases are difficult to quantify because levels are so low. The site characterization focused on contaminants in surface water, sediment, and biota. Contaminants in surface water were all found to be below Ambient Water Quality Criteria. Other findings included the following: elevated metals including cesium 137 and mercury in McCoy Branch sediments; PCBs and chlordane elevated in several fish species, presenting the only major human health risk, significant ecological risks in Poplar Creek but not in the Clinch River

  4. Remedial investigation/feasibility study for the Clinch River/Poplar Creek operable unit. Volume 1. Main text

    International Nuclear Information System (INIS)

    1995-09-01

    This is the combined Remedial Investigation/Feasibility Study Report for the Clinch River/Poplar Crack (CR/PC) Operable Unit (OU). The CR/PC OU is located in Anderson and Roane Counties, Tennessee and consists of the Clinch River and several of its embayments in Melton Hill and Watts Bar Reservoirs. These waters have received hazardous substances released over a period of 50 years from the US Department of Energy's Oak Ridge Reservation (ORR), a National Priority List site established under the Comprehensive Environmental Response, Compensation, and Liability Act. A remedial investigation has been conducted to determine the current nature and extent of any contamination and to assess the resulting risk to human health and the environment. The feasibility study evaluates remedial action alternatives to identify any that are feasible for implementation and that would effectively reduce risk. Historical studies had indicated that current problems would likely include 137 Cs in sediment of the Clinch River, mercury in sediment and fish of Poplar Creek and PCBs and pesticides in fish from throughout the OU. Peak releases of mercury and 137 Cs occurred over 35 years ago, and current releases are low. Past releases of PCBs from the ORR are poorly quantified, and current releases are difficult to quantify because levels are so low. The site characterization focused on contaminants in surface water, sediment, and biota. Contaminants in surface water were all found to be below Ambient Water Quality Criteria. Other findings included the following: elevated metals including cesium 137 and mercury in McCoy Branch sediments; PCBs and chlordane elevated in several fish species, presenting the only major human health risk, significant ecological risks in Poplar Creek but not in the Clinch River

  5. Remedial investigation/feasibility study of the Clinch River/Poplar Creek operable unit. Volume 1, main text

    International Nuclear Information System (INIS)

    1996-03-01

    This document is the combined Remedial Investigation/Feasibility Study (RI/FS) Report for the Clinch River/Poplar Creek Operable Unit (CR/PC OU), an off-site OU associated with environmental restoration activities at the U.S. Department of Energy (DOE) Oak Ridge Reservation (ORR). As a result of past, present, and potential future releases of hazardous substances into the environment, the ORR was placed on the National Priorities List in December 1989 (54 FR 48184). Sites on this list must be investigated for possible remedial action, as required by the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA, 42 U.S.C. 9601, et seq.). This report documents the findings of the remedial investigation of this OU and the feasibility of potential remedial action alternatives. These studies are authorized by Sect. 117 of CERCLA and were conducted in accordance with the requirements of the National Contingency Plan (40 CFR Part 300). DOE, the U.S. Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC) have entered into a Federal Facility Agreement (FFA), as authorized by Sect. 120 of CERCLA and Sects. 3008(h) and 6001 of the Resource Conservation and Recovery Act (RCRA) (42 U.S.C. 6901, et seq.). The purpose of this agreement is to ensure a coordinated and effective response for all environmental restoration activities occurring at the ORR. In addition to other responsibilities, the FFA parties mutually define the OU boundaries, set remediation priorities, establish remedial investigation priorities and strategies, and identify and select remedial actions. A copy of this FFA is available from the DOE Information Resource Center in Oak Ridge, Tennessee

  6. Feasibility study report for Operable Unit 4: Fernald Environmental Management Project, Fernald, Ohio: Remedial investigation and feasibility study: Volume 3: Final report

    International Nuclear Information System (INIS)

    1994-02-01

    This report documents the Feasibility Study (FS) phase of the Fernald Environmental Management Project (FEMP) Operable Unit 4 Remedial Investigation/Feasibility Study (RI/FS) Program. The FEMP, formerly known as the Feed Materials Production Center (FMPC), is a US Department of Energy (DOE) facility that operated from 1952 to 1989. The facility's primarily function was to provide high purity uranium metal products to support United States defense programs. Production operations were suspended in 1989 to focus on environmental restoration and waste management activities at the facility. The RI/FS is being conducted pursuant to the terms of a Consent Agreement between DOE and the US Environmental Protection Agency (EPA) under Sections 120 and 106(a) of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended. The Ohio Environmental Protection Agency (OEPA) is also participating in the RI/FS process at the FEMP through direct involvement in program review meetings and technical review of project documentation. The objective of the RI/FS process is to gather information to support an informed risk management decision regarding which remedy appears to be the most appropriate action for addressing the environmental concerns identified at the FEMP. This volume contains appendices F--J

  7. 200-BP-11 operable unit and 216-B-3 main pond work/closure plan, Hanford Site, Richland, Washington. Volume 1: Field investigation and sampling strategy

    International Nuclear Information System (INIS)

    1994-09-01

    This document coordinates a Resource Conservation and Recovery Act (RCRA) past-practice work plan for the 200-BP-11 Operable Unit and a RCRA closure/postclosure plan for the 216-B-3 Main Pond and 216-B-3-3 Ditch [treatment, storage, and/or disposal (TSD) unit]. Both RCRA TSD and past-practice waste management units are contained within the 200-BP-11 Operable Unit. The 200-BP-11 Operable Unit is a source operable unit located on the east side of the B Plant Source Aggregate Area in the 200 East Area of the Hanford Site. The operable unit lies just east of the 200 East Area perimeter fence and encompass approximately 476 hectares (1,175 acres). Source operable units include waste management units that are potential sources of radioactive and/or hazardous substance contamination. Source waste management units are categorized in the Hanford Federal Facility Agreement and Consent Order as either RCRA TSD, RCRA past-practice, or Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) past-practice. As listed below and in the Tri-Party Agreement, the 200-BP-11 Operable Unit contains five RCRA past-practice and five RCRA TSD waste management units. Additionally, for RCRA TSD permitting purposes, the RCRA TSD waste management units are subdivided into two RCRA TSD units

  8. MPCV Exercise Operational Volume Analysis

    Science.gov (United States)

    Godfrey, A.; Humphreys, B.; Funk, J.; Perusek, G.; Lewandowski, B. E.

    2017-01-01

    In order to minimize the loss of bone and muscle mass during spaceflight, the Multi-purpose Crew Vehicle (MPCV) will include an exercise device and enough free space within the cabin for astronauts to use the device effectively. The NASA Digital Astronaut Project (DAP) has been tasked with using computational modeling to aid in determining whether or not the available operational volume is sufficient for in-flight exercise.Motion capture data was acquired using a 12-camera Smart DX system (BTS Bioengineering, Brooklyn, NY), while exercisers performed 9 resistive exercises without volume restrictions in a 1g environment. Data were collected from two male subjects, one being in the 99th percentile of height and the other in the 50th percentile of height, using between 25 and 60 motion capture markers. Motion capture data was also recorded as a third subject, also near the 50th percentile in height, performed aerobic rowing during a parabolic flight. A motion capture system and algorithms developed previously and presented at last years HRP-IWS were utilized to collect and process the data from the parabolic flight [1]. These motions were applied to a scaled version of a biomechanical model within the biomechanical modeling software OpenSim [2], and the volume sweeps of the motions were visually assessed against an imported CAD model of the operational volume. Further numerical analysis was performed using Matlab (Mathworks, Natick, MA) and the OpenSim API. This analysis determined the location of every marker in space over the duration of the exercise motion, and the distance of each marker to the nearest surface of the volume. Containment of the exercise motions within the operational volume was determined on a per-exercise and per-subject basis. The orientation of the exerciser and the angle of the footplate were two important factors upon which containment was dependent. Regions where the exercise motion exceeds the bounds of the operational volume have been

  9. Remedial investigation/feasibility study of the Clinch River/Poplar Creek Operable Unit. Volume 3. Risk assessment information. Appendixes E, F

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    This report presents the findings of an investigation into contamination of the Clinch River and Poplar Creek near the U.S. Department of Energy`s (DOE`s) Oak Ridge Reservation (ORR) in eastern Tennessee. For more than 50 years, various hazardous and radioactive substances have been released to the environment as a result of operations and waste management activities at the ORR. In 1989, the ORR was placed on the National Priorities List (NPL), established and maintained under the federal Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under CERCLA, NPL sites must be investigated to determine the nature and extent of contamination at the site, assess the risk to human health and the environment posed by the site, and, if necessary, identify feasible remedial alternatives that could be used to clean the site and reduce risk. To facilitate the overall environmental restoration effort at the ORR, CERCLA activities are being implemented individually as distinct operable units (OUs). This document is Volume 3 of the combined Remedial Investigation and Feasibility Study Report for the Clinch River/Poplar Creek OU.

  10. Remedial investigation/feasibility study of the Clinch River/Poplar Creek Operable Unit. Volume 5. Appendixes J, K, L, M, and N-other supporting information

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-06-01

    This report presents the findings of an investigation into contamination of the Clinch River and Poplar Creek near the U.S. Department of Energy`s (DOE`s) Oak Ridge Reservation (ORR) in eastern Tennessee. For more than 50 years, various hazardous and radioactive substances have been released to the environment as a result of operations and waste management activities at the ORR. In 1989, the ORR was placed on the National Priorities List (NPL), established and maintained under the federal Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under CERCLA, NPL sites must be investigated to determine the nature and extent of contamination at the site, assess the risk to human health and the environment posed by the site, and, if necessary, identify feasible remedial alternatives that could be used to clean the site and reduce risk. To facilitate the overall environmental restoration effort at the ORR, CERCLA activities are being implemented individually as distinct operable units (OUs). This document is Volume 5 of the combined Remedial Investigation and Feasibility Study Report for the Clinch River/Poplar Creek OU.

  11. Integrated Ground Operations Demonstration Units

    Data.gov (United States)

    National Aeronautics and Space Administration — The overall goal of the AES Integrated Ground Operations Demonstration Units (IGODU) project is to demonstrate cost efficient cryogenic operations on a relevant...

  12. Evaluation of potential severe accidents during low power and shutdown operations at Grand Gulf, Unit 1: Evaluation of severe accident risks for plant operational state 5 during a refueling outage. Main report and appendices, Volume 6, Part 1

    Energy Technology Data Exchange (ETDEWEB)

    Brown, T.D.; Kmetyk, L.N.; Whitehead, D.; Miller, L. [Sandia National Labs., Albuquerque, NM (United States); Forester, J. [Science Applications International Corp., Albuquerque, NM (United States); Johnson, J. [GRAM, Inc., Albuquerque, NM (United States)

    1995-03-01

    Traditionally, probabilistic risk assessments (PRAS) of severe accidents in nuclear power plants have considered initiating events potentially occurring only during full power operation. Recent studies and operational experience have, however, implied that accidents during low power and shutdown could be significant contributors to risk. In response to this concern, in 1989 the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the potential risks during low power and shutdown operations. Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the plants to be studied. The program consists of two parallel projects being performed by Brookhaven National Laboratory (Surry) and Sandia National Laboratories (Grand Gulf). The program objectives include assessing the risks of severe accidents initiated during plant operational states other than full power operation and comparing the estimated risks with the risk associated with accidents initiated during full power operation as assessed in NUREG-1150. The scope of the program is that of a Level-3 PRA. The subject of this report is the PRA of the Grand Gulf Nuclear Station, Unit 1. The Grand Gulf plant utilizes a 3833 MWt BUR-6 boiling water reactor housed in a Mark III containment. The Grand Gulf plant is located near Port Gibson, Mississippi. The regime of shutdown analyzed in this study was plant operational state (POS) 5 during a refueling outage, which is approximately Cold Shutdown as defined by Grand Gulf Technical Specifications. The entire PRA of POS 5 is documented in a multi-volume NUREG report (NUREG/CR-6143). The internal events accident sequence analysis (Level 1) is documented in Volume 2. The Level 1 internal fire and internal flood analyses are documented in Vols 3 and 4, respectively.

  13. Evaluation of potential severe accidents during low power and shutdown operations at Grand Gulf, Unit 1: Evaluation of severe accident risks for plant operational state 5 during a refueling outage. Main report and appendices, Volume 6, Part 1

    International Nuclear Information System (INIS)

    Brown, T.D.; Kmetyk, L.N.; Whitehead, D.; Miller, L.; Forester, J.; Johnson, J.

    1995-03-01

    Traditionally, probabilistic risk assessments (PRAS) of severe accidents in nuclear power plants have considered initiating events potentially occurring only during full power operation. Recent studies and operational experience have, however, implied that accidents during low power and shutdown could be significant contributors to risk. In response to this concern, in 1989 the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the potential risks during low power and shutdown operations. Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the plants to be studied. The program consists of two parallel projects being performed by Brookhaven National Laboratory (Surry) and Sandia National Laboratories (Grand Gulf). The program objectives include assessing the risks of severe accidents initiated during plant operational states other than full power operation and comparing the estimated risks with the risk associated with accidents initiated during full power operation as assessed in NUREG-1150. The scope of the program is that of a Level-3 PRA. The subject of this report is the PRA of the Grand Gulf Nuclear Station, Unit 1. The Grand Gulf plant utilizes a 3833 MWt BUR-6 boiling water reactor housed in a Mark III containment. The Grand Gulf plant is located near Port Gibson, Mississippi. The regime of shutdown analyzed in this study was plant operational state (POS) 5 during a refueling outage, which is approximately Cold Shutdown as defined by Grand Gulf Technical Specifications. The entire PRA of POS 5 is documented in a multi-volume NUREG report (NUREG/CR-6143). The internal events accident sequence analysis (Level 1) is documented in Volume 2. The Level 1 internal fire and internal flood analyses are documented in Vols 3 and 4, respectively

  14. Oconee Nuclear Station, Units 1, 2, and 3. Annual operating report for 1976, volume 1: nonradiological environmental surveillance report; II: summary of operations

    International Nuclear Information System (INIS)

    1977-01-01

    The non-radiological environmental surveillance program including thermal and chemical effluents, water quality, fish populations, benthos, fish impingement, gas-bubble disease, and plankton, fish larvae and fish egg entrainment is described. Information is also presented concerning operations, personnel radiation exposures, and fuel examinations

  15. Evaluation of potential severe accidents during low power and shutdown operations at Grand Gulf, Unit 1: Summary of results. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Whitehead, D.W. [ed.; Staple, B.D.; Daniel, S.L. [and others

    1995-07-01

    During 1989 the Nuclear Regulatory Commission (NRC) initiated an extensive program to examine the potential risks during low power and shutdown operations. Two plants, Surry and Grand Gulf, were selected as the plants to be studied by Brookhaven National Laboratory (Surry) and Sandia National Laboratories (Grand Gulf). This report documents the work performed during the analysis of the Grand Gulf plant. A phased approach was used for the overall study. In Phase 1, the objectives were to identify potential vulnerable plant configurations, to characterize (on a high, medium, or low basis) the potential core damage accident scenario frequencies and risks, and to provide a foundation for a detailed Phase 2 analysis. It was in Phase 1 that the concept of plant operational states (POSs) was developed to allow the analysts to better represent the plant as it transitions from power operation to nonpower operation than was possible with the traditional technical specification divisions of modes of operation. This phase consisted of a coarse screening analysis performed for all POSs, including seismic and internal fire and flood for some POSs. In Phase 2, POS 5 (approximately cold shutdown as defined by Grand Gulf Technical Specifications) during a refueling outage was selected as the plant configuration to be analyzed based on the results of the Phase 1 study. The scope of the Level 1 study includes plant damage state analysis and uncertainty analysis and is documented in a multi-volume NUREG/CR report (i.e., NUREG/CR-6143). The internal events analysis is documented in Volume 2. Internal fire and internal flood analyses are documented in Volumes 3 and 4, respectively. A separate study on seismic analysis, documented in Volume 5, was performed for the NRC by Future Resources Associates, Inc. The Level 2/3 study of the traditional internal events is documented in Volume 6, and a summary of the results for all analyses is documented in Volume 1.

  16. Evaluation of potential severe accidents during low power and shutdown operations at Grand Gulf, Unit 1: Summary of results. Volume 1

    International Nuclear Information System (INIS)

    Whitehead, D.W.; Staple, B.D.; Daniel, S.L.

    1995-07-01

    During 1989 the Nuclear Regulatory Commission (NRC) initiated an extensive program to examine the potential risks during low power and shutdown operations. Two plants, Surry and Grand Gulf, were selected as the plants to be studied by Brookhaven National Laboratory (Surry) and Sandia National Laboratories (Grand Gulf). This report documents the work performed during the analysis of the Grand Gulf plant. A phased approach was used for the overall study. In Phase 1, the objectives were to identify potential vulnerable plant configurations, to characterize (on a high, medium, or low basis) the potential core damage accident scenario frequencies and risks, and to provide a foundation for a detailed Phase 2 analysis. It was in Phase 1 that the concept of plant operational states (POSs) was developed to allow the analysts to better represent the plant as it transitions from power operation to nonpower operation than was possible with the traditional technical specification divisions of modes of operation. This phase consisted of a coarse screening analysis performed for all POSs, including seismic and internal fire and flood for some POSs. In Phase 2, POS 5 (approximately cold shutdown as defined by Grand Gulf Technical Specifications) during a refueling outage was selected as the plant configuration to be analyzed based on the results of the Phase 1 study. The scope of the Level 1 study includes plant damage state analysis and uncertainty analysis and is documented in a multi-volume NUREG/CR report (i.e., NUREG/CR-6143). The internal events analysis is documented in Volume 2. Internal fire and internal flood analyses are documented in Volumes 3 and 4, respectively. A separate study on seismic analysis, documented in Volume 5, was performed for the NRC by Future Resources Associates, Inc. The Level 2/3 study of the traditional internal events is documented in Volume 6, and a summary of the results for all analyses is documented in Volume 1

  17. Evaluation of potential severe accidents during low power and shutdown operations at Grand Gulf, Unit 1: Evaluation of severe accident risks for plant operational state 5 during a refueling outage. Supporting MELCOR calculations, Volume 6, Part 2

    International Nuclear Information System (INIS)

    Kmetyk, L.N.; Brown, T.D.

    1995-03-01

    To gain a better understanding of the risk significance of low power and shutdown modes of operation, the Office of Nuclear Regulatory Research at the NRC established programs to investigate the likelihood and severity of postulated accidents that could occur during low power and shutdown (LP ampersand S) modes of operation at commercial nuclear power plants. To investigate the likelihood of severe core damage accidents during off power conditions, probabilistic risk assessments (PRAs) were performed for two nuclear plants: Unit 1 of the Grand Gulf Nuclear Station, which is a BWR-6 Mark III boiling water reactor (BWR), and Unit 1 of the Surry Power Station, which is a three-loop, subatmospheric, pressurized water reactor (PWR). The analysis of the BWR was conducted at Sandia National Laboratories while the analysis of the PWR was performed at Brookhaven National Laboratory. This multi-volume report presents and discusses the results of the BWR analysis. The subject of this part presents the deterministic code calculations, performed with the MELCOR code, that were used to support the development and quantification of the PRA models. The background for the work documented in this report is summarized, including how deterministic codes are used in PRAS, why the MELCOR code is used, what the capabilities and features of MELCOR are, and how the code has been used by others in the past. Brief descriptions of the Grand Gulf plant and its configuration during LP ampersand S operation and of the MELCOR input model developed for the Grand Gulf plant in its LP ampersand S configuration are given

  18. Evaluation of potential severe accidents during low power and shutdown operations at Grand Gulf, Unit 1: Evaluation of severe accident risks for plant operational state 5 during a refueling outage. Supporting MELCOR calculations, Volume 6, Part 2

    Energy Technology Data Exchange (ETDEWEB)

    Kmetyk, L.N.; Brown, T.D. [Sandia National Labs., Albuquerque, NM (United States)

    1995-03-01

    To gain a better understanding of the risk significance of low power and shutdown modes of operation, the Office of Nuclear Regulatory Research at the NRC established programs to investigate the likelihood and severity of postulated accidents that could occur during low power and shutdown (LP&S) modes of operation at commercial nuclear power plants. To investigate the likelihood of severe core damage accidents during off power conditions, probabilistic risk assessments (PRAs) were performed for two nuclear plants: Unit 1 of the Grand Gulf Nuclear Station, which is a BWR-6 Mark III boiling water reactor (BWR), and Unit 1 of the Surry Power Station, which is a three-loop, subatmospheric, pressurized water reactor (PWR). The analysis of the BWR was conducted at Sandia National Laboratories while the analysis of the PWR was performed at Brookhaven National Laboratory. This multi-volume report presents and discusses the results of the BWR analysis. The subject of this part presents the deterministic code calculations, performed with the MELCOR code, that were used to support the development and quantification of the PRA models. The background for the work documented in this report is summarized, including how deterministic codes are used in PRAS, why the MELCOR code is used, what the capabilities and features of MELCOR are, and how the code has been used by others in the past. Brief descriptions of the Grand Gulf plant and its configuration during LP&S operation and of the MELCOR input model developed for the Grand Gulf plant in its LP&S configuration are given.

  19. Final environmental statement related to operation of Indian Point Nuclear Generating Plant, Unit No. 3: (Docket No. 50-286): Volume 1

    International Nuclear Information System (INIS)

    1975-02-01

    The proposed action is the issuance of a license to consolidated Edison Company of New York, Inc., for the operation of the Indian Point Nuclear Generating Plant, Unit No. 3, located in the State of New York, Westchester County, Village of Buchanan, 24 miles north of the New York City boundary line. Although the present action is the issuance of an operating license for Unit No. 3, this Statement considers the environmental impacts from simultaneous operation of all three Units. A Final Environmental Statement has been issued for Unit No. 2. Furthermore, in view of the proximity to the Indian Point site of existing and presently proposed power plants on the Hudson River, the cumulative environmental benefits and impacts of the plants within a 30-mile reach of the river have been assessed. The proposed action is interreleated to other actions taken by other Federal agencies such as the Environmental Protection Agency, in regard to granting or denying application for discharge permits under the National Pollutant Discharge Elimination System (NPDES) instituted through the Federal Water Pollution Control Act Amendments of 1972, and the Federal Power Commission, in licensing of other facilities on the Hudson River. 128 figs., 210 tabs

  20. No Correlation Between Work-Hours and Operative Volumes

    DEFF Research Database (Denmark)

    Kjærgaard, Jane; Sillesen, Martin; Beier-Holgersen, Randi

    2016-01-01

    OBJECTIVE: Since 2003, United States residents have been limited to an 80-hour workweek. This has prompted concerns of reduced educational quality, especially inadequate operating exposure. In contrast, the Danish surgical specialty-training program mandates a cap on working hours of 37 per week....... We hypothesize that there is no direct correlation between work-hours and operative volume achieved during surgical residency. To test the hypothesis, we compare Danish and US operative volumes achieved during surgical residency training. DESIGN: Retrospective comparative study. PARTICIPANTS...... find no difference in overall surgical volumes between Danes and US residents during their surgical training. When time in training was accounted for, differences between weekly surgical volumes achieved were minor, indicating a lack of direct correlation between weekly work-hours and operative volumes...

  1. Evaluation of potential severe accidents during low power and shutdown operations at Surry, Unit 1: Analysis of core damage frequency from internal events during mid-loop operations. Appendix E (Sections E.9-E.16), Volume 2, Part 3B

    Energy Technology Data Exchange (ETDEWEB)

    Chu, T.L.; Musicki, Z.; Kohut, P.; Yang, J.; Bozoki, G.; Hsu, C.J.; Diamond, D.J.; Wong, S.M. [Brookhaven National Lab., Upton, NY (United States); Bley, D.; Johnson, D. [PLG Inc., Newport Beach, CA (United States)] [and others

    1994-06-01

    Traditionally, probabilistic risk assessments (PRA) of severe accidents in nuclear power plants have considered initiating events potentially occurring only during full power operation. Some previous screening analyses that were performed for other modes of operation suggested that risks during those modes were small relative to full power operation. However, more recent studies and operational experience have implied that accidents during low power and shutdown could be significant contributors to risk. Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the plants to be studied. The objectives of the program are to assess the risks of severe accidents initiated during plant operational states other than full power operation and to compare the estimated core damage frequencies, important accident sequences and other qualitative and quantitative results with those accidents initiated during full power operation as assessed in NUREG-1150. The scope of the program includes that of a level-3 PRA. In phase 2, mid-loop operation was selected as the plant configuration to be analyzed based on the results of the phase 1 study. The objective of the phase 2 study is to perform a detailed analysis of the potential accident scenarios that may occur during mid-loop operation, and compare the results with those of NUREG-1150. The scope of the level-1 study includes plant damage state analysis, and uncertainty analysis. Volume 1 summarizes the results of the study. Internal events analysis is documented in Volume 2. It also contains an appendix that documents the part of the phase 1 study that has to do with POSs other than mid-loop operation. Internal fire and internal flood analyses are documented in Volumes 3 and 4. A separate study on seismic analysis, documented in Volume 5, was performed for the NRC by Future Resources Associates, Inc. Volume 6 documents the accident progression, source terms, and consequence analysis.

  2. Evaluation of potential severe accidents during low power and shutdown operations at Surry, Unit-1: Analysis of core damage frequency from internal events during mid-loop operations. Appendices F-H, Volume 2, Part 4

    International Nuclear Information System (INIS)

    Chu, T.L.; Musicki, Z.; Kohut, P.; Yang, J.; Bozoki, G.; Hsu, C.J.; Diamond, D.J.; Bley, D.; Johnson, D.; Holmes, B.

    1994-06-01

    Traditionally, probabilistic risk assessments (PRA) of severe accidents in nuclear power plants have considered initiating events potentially occurring only during full power operation. Some previous screening analyses that were performed for other modes of operation suggested that risks during those modes were small relative to full power operation. However, more recent studies and operational experience have implied that accidents during low power and shutdown could be significant contributors to risk. Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the plants to be studied. The objectives of the program are to assess the risks of severe accidents initiated during plant operational states other than full power operation and to compare the estimated core damage frequencies, important accident sequences and other qualitative and quantitative results with those accidents initiated during full power operation as assessed in NUREG-1150. The scope of the program includes that of a level-3 PRA. In phase 2, mid-loop operation was selected as the plant configuration to be analyzed based on the results of the phase 1 study. The objective of the phase 2 study is to perform a detailed analysis of the potential accident scenarios that may occur during mid-loop operation, and compare the results with those of NUREG-1150. The scope of the level-1 study includes plant damage state analysis, and uncertainty analysis. Volume 1 summarizes the results of the study. Internal events analysis is documented in Volume 2. It also contains an appendix that documents the part of the phase 1 study that has to do with POSs other than mid-loop operation. Internal fire and internal flood analyses are documented in Volumes 3 and 4. A separate study on seismic analysis, documented in Volume 5, was performed for the NRC by Future Resources Associates, Inc. Volume 6 documents the accident progression, source terms, and consequence analysis

  3. Evaluation of potential severe accidents during low power and shutdown operations at Surry, Unit 1: Analysis of core damage frequency from internal events during mid-loop operations. Appendix E (Sections E.9-E.16), Volume 2, Part 3B

    International Nuclear Information System (INIS)

    Chu, T.L.; Musicki, Z.; Kohut, P.; Yang, J.; Bozoki, G.; Hsu, C.J.; Diamond, D.J.; Wong, S.M.; Bley, D.; Johnson, D.

    1994-06-01

    Traditionally, probabilistic risk assessments (PRA) of severe accidents in nuclear power plants have considered initiating events potentially occurring only during full power operation. Some previous screening analyses that were performed for other modes of operation suggested that risks during those modes were small relative to full power operation. However, more recent studies and operational experience have implied that accidents during low power and shutdown could be significant contributors to risk. Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the plants to be studied. The objectives of the program are to assess the risks of severe accidents initiated during plant operational states other than full power operation and to compare the estimated core damage frequencies, important accident sequences and other qualitative and quantitative results with those accidents initiated during full power operation as assessed in NUREG-1150. The scope of the program includes that of a level-3 PRA. In phase 2, mid-loop operation was selected as the plant configuration to be analyzed based on the results of the phase 1 study. The objective of the phase 2 study is to perform a detailed analysis of the potential accident scenarios that may occur during mid-loop operation, and compare the results with those of NUREG-1150. The scope of the level-1 study includes plant damage state analysis, and uncertainty analysis. Volume 1 summarizes the results of the study. Internal events analysis is documented in Volume 2. It also contains an appendix that documents the part of the phase 1 study that has to do with POSs other than mid-loop operation. Internal fire and internal flood analyses are documented in Volumes 3 and 4. A separate study on seismic analysis, documented in Volume 5, was performed for the NRC by Future Resources Associates, Inc. Volume 6 documents the accident progression, source terms, and consequence analysis

  4. Effect of operator and institutional volume on clinical outcomes after percutaneous coronary interventions performed in Canada and the United States: a brief report from the Enhanced Suppression of the Platelet glycoprotein IIb/IIIa Receptor with Integrilin Therapy (ESPRIT) study.

    Science.gov (United States)

    Madan, Mina; Nikhil, Janarthan; Hellkamp, Anne S; Pieper, Karen S; Labinaz, Marino; Cohen, E A; Buller, Christopher E; Cantor, Warren J; Seidelin, Peter; Ducas, John; Carere, Ronald G; Natarajan, Madhu K; O'Shea, J Conor; Tcheng, James E

    2009-08-01

    The Enhanced Suppression of the Platelet glycoprotein IIb/IIIa Receptor with Integrilin Therapy (ESPRIT) trial compared the use of eptifibatide with placebo in 2064 coronary intervention patients. It was previously reported that Canadian patients had reduced rates of 30-day and one-year death, myocardial infarction (MI) or target vessel revascularization (TVR) compared with patients in the United States (US). To examine whether operator or institutional volume differences explain the regional variation in clinical outcome. Each site received an operator and institutional volume survey. Fifty-seven sites (62%) returned complete data on 1338 patients. In this smaller cohort, Canadian patients had reduced rates of 30-day and one-year death, MI or TVR compared with US patients (6.3% versus 10.3% and 14.9% versus 20.1%, respectively; PESPRIT study, institutional volume was associated with a modest reduction in risk of death, MI or TVR over short- and long-term follow-up periods. The Canadian and US investigators and institutions selected in ESPRIT had similar annual procedural volumes. Therefore, volume variables did not explain the differential risk of clinical events observed for patients enrolled in the two countries.

  5. Remedial investigation/feasibility study of the Clinch River/Poplar Creek Operable Unit. Volume 2. Biota and representative concentrations of contaminants. Appendixes A, B, C, D

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    This report presents the findings of an investigation into contamination of the Clinch River and Poplar Creek near the U.S. Department of Energy`s (DOE`s) Oak Ridge Reservation (ORR) in eastern Tennessee. For more than 50 years, various hazardous and radioactive substances have been released to the environment as a result of operations and waste management activities at the ORR. In 1989, the ORR was placed on the National Priorities List (NPL), established and maintained under the federal Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under CERCLA, NPL sites must be investigated to determine the nature and extent of contamination at the site, assess the risk to human health and the environment posed by the site, and, if necessary, identify feasible remedial alternatives that could be used to clean the site and reduce risk. To facilitate the overall environmental restoration effort at the ORR, CERCLA activities are being implemented individually as distinct operable units (OU`s). This document is the combined Remedial Investigation and Feasibility Study Report for the Clinch River/Poplar Creek OU.

  6. Remedial investigation/feasibility study of the Clinch River/Poplar Creek operable unit. Volume 4. Information related to the feasibility study and ARARs. Appendixes G, H, I

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    This report presents the findings of an investigation into contamination of the Clinch River and Poplar Creek near the U.S. Department of Energy`s (DOE`s) Oak Ridge Reservation (ORR) in eastern Tennessee. For more than 50 years, various hazardous and radioactive substances have been released to the environment as a result of operations and waste management activities at the ORR. In 1989, the ORR was placed on the National Priorities List (NPL), established and maintained under the federal Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under CERCLA, NPL sites must be investigated to determine the nature and extent of contamination at the site, assess the risk to human health and the environment posed by the site, and, if necessary, identify feasible remedial alternatives that could be used to clean the site and reduce risk. To facilitate the overall environmental restoration effort at the ORR, CERCLA activities are being implemented individually as distinct operable units (OUs). This document is the combined Remedial Investigation and Feasibility Study Report for the Clinch River/Poplar Creek OU.

  7. Remedial investigation/feasibility study of the Clinch River/Poplar Creek operable unit. Volume 3: Appendixes E and F -- Risk assessment information

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-06-01

    This report presents the findings of an investigation into contamination of the Clinch River and Poplar Creek near the US Department of Energy`s (DOE`s) Oak Ridge Reservation (ORR) in eastern Tennessee. For more than 50 years, various hazardous and radioactive substances have been released to the environment as a result of operations and waste management activities at the ORR. In 1989, the ORR was placed on the National Priorities List (NPL), established and maintained under the federal Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under CERCLA, NPL sites must be investigated to determine the nature and extent of contamination at the site, assess the risk to human health and the environment posed by the site, and, if necessary, identify feasible remedial alternatives that could be used to clean the site and reduce risk. To facilitate the overall environmental restoration effort at the ORR, CERCLA activities are being implemented individually as distinct operable units (OUs). This document is the combined Remedial Investigation and Feasibility Study Report for the Clinch River/Poplar Creek OU.

  8. Evaluation of potential severe accidents during low power and shutdown operations at Grand Gulf, Unit 1: Analysis of core damage frequency from internal events for Plant Operational State 5 during a refueling outage. Volume 2, Part 3: Internal Events Appendices I and J

    Energy Technology Data Exchange (ETDEWEB)

    Yakle, J. [Science Applications International Corp., Albuquerque, NM (United States); Darby, J. [Science and Engineering Associates, Inc., Albuquerque, NM (United States); Whitehead, D.; Staple, B. [Sandia National Labs., Albuquerque, NM (United States)

    1994-06-01

    This report provides supporting documentation for various tasks associated with the performance of the probablistic risk assessment for Plant Operational State 5 during a refueling outage at Grand Gulf, Unit 1 as documented in Volume 2, Part 1 of NUREG/CR-6143.

  9. Evaluation of potential severe accidents during low power and shutdown operations at Grand Gulf, Unit 1: Analysis of core damage frequency from internal events for Plant Operational State 5 during a refueling outage. Volume 2, Part 3: Internal Events Appendices I and J

    International Nuclear Information System (INIS)

    Yakle, J.; Darby, J.; Whitehead, D.; Staple, B.

    1994-06-01

    This report provides supporting documentation for various tasks associated with the performance of the probablistic risk assessment for Plant Operational State 5 during a refueling outage at Grand Gulf, Unit 1 as documented in Volume 2, Part 1 of NUREG/CR-6143

  10. Evaluation of potential severe accidents during low power and shutdown operations at Surry, Unit 1: Evaluation of severe accident risk during mid-loop operations. Main report. Volume 6. Part 1

    Energy Technology Data Exchange (ETDEWEB)

    Jo, J.; Lin, C.C.; Neymotin, L. [Brookhaven National Lab., Upton, NY (United States)] [and others

    1995-05-01

    During 1989, the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the potential risks during low power and shutdown operations. The program includes two parallel projects being performed by Brookhaven National Laboratory (BNL) and Sandia National Laboratories (SNL). Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the plants to be studied. The objectives of the program are to assess the risks of severe accidents initiated during plant operational states other than full power operation and to compare the estimated core damage frequencies, important accident sequences and other qualitative and quantitative results with those accidents initiated during full power operation as assessed in NUREG-1150. The scope of the program includes that of a level-3 PRA. A phased approach was used in the level-1 program. In phase 1 which was completed in Fall 1991, a coarse screening analysis including internal fire and flood was performed for all plant operational states (POSs). The objective of the phase 1 study was to identify potential vulnerable plant configurations, to characterize (on a high, medium, or low basis) the potential core damage accident scenarios, and to provide a foundation for a detailed phase 2 analysis. In phase 2, mid-loop operation was selected as the plant configuration to be analyzed based on the results of the phase 1 study. The objective of the phase 2 study is to perform a detailed analysis of the potential accident scenarios that may occur during mid-loop operation, and compare the results with those of NUREG-1150. The results of the phase 2 level 2/3 study are the subject of this volume of NUREG/CR-6144, Volume 6.

  11. Evaluation of potential severe accidents during low power and shutdown operations at Surry, Unit 1: Evaluation of severe accident risk during mid-loop operations. Main report. Volume 6. Part 1

    International Nuclear Information System (INIS)

    Jo, J.; Lin, C.C.; Neymotin, L.

    1995-05-01

    During 1989, the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the potential risks during low power and shutdown operations. The program includes two parallel projects being performed by Brookhaven National Laboratory (BNL) and Sandia National Laboratories (SNL). Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the plants to be studied. The objectives of the program are to assess the risks of severe accidents initiated during plant operational states other than full power operation and to compare the estimated core damage frequencies, important accident sequences and other qualitative and quantitative results with those accidents initiated during full power operation as assessed in NUREG-1150. The scope of the program includes that of a level-3 PRA. A phased approach was used in the level-1 program. In phase 1 which was completed in Fall 1991, a coarse screening analysis including internal fire and flood was performed for all plant operational states (POSs). The objective of the phase 1 study was to identify potential vulnerable plant configurations, to characterize (on a high, medium, or low basis) the potential core damage accident scenarios, and to provide a foundation for a detailed phase 2 analysis. In phase 2, mid-loop operation was selected as the plant configuration to be analyzed based on the results of the phase 1 study. The objective of the phase 2 study is to perform a detailed analysis of the potential accident scenarios that may occur during mid-loop operation, and compare the results with those of NUREG-1150. The results of the phase 2 level 2/3 study are the subject of this volume of NUREG/CR-6144, Volume 6

  12. Organization of Control Units with Operational Addressing

    OpenAIRE

    Alexander A. Barkalov; Roman M. Babakov; Larysa A. Titarenko

    2012-01-01

    The using of operational addressing unit as the block of control unit is proposed. The new structure model of Moore finite-state machine with reduced hardware amount is developed. The generalized structure of operational addressing unit is suggested. An example of synthesis process for Moore finite-state machine with operational addressing unit is given. The analytical researches of proposed structure of control unit are executed.

  13. Evaluation of potential severe accidents during Low Power and Shutdown Operations at Grand Gulf, Unit 1. Volume 2, Part 1B: Analysis of core damage frequency from internal events for Plant Operational State 5 during a refueling outage, Main report (Section 10)

    International Nuclear Information System (INIS)

    Whitehead, D.; Darby, J.; Yakle, J.

    1994-06-01

    This document contains the accident sequence analysis of internally initiated events for Grand Gulf, Unit 1 as it operates in the Low Power and Shutdown Plant Operational State 5 during a refueling outage. The report documents the methodology used during the analysis, describes the results from the application of the methodology, and compares the results with the results from two full power performed on Grand Gulf. This document, Volume 2, Part 1B, presents chapters Section 10 of this report, Human Reliability Analysis

  14. Addendum to the remedial investigation report on Bear Creek Valley Operable Unit 2 (Rust Spoil Area, Spoil Area 1, and SY-200 Yard) at the Oak Ridge Y-12 Plant Oak Ridge, Tennessee. Volume 1: Main text

    International Nuclear Information System (INIS)

    1995-04-01

    This addendum to the Remedial Investigation (RI) Report on Bear Creek Valley Operable Unit (OU) 2 at the Oak Ridge Y-12 Plant was prepared in accordance with requirements under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) for reporting the results of a site characterization for public review. This addendum is a supplement to a document that was previously issued in January 1995 and that provided the Environmental Restoration Program with information about the results of the 1993 investigation performed at OU 2. The January 1995 D2 version of the RI Report on Bear Creek Valley OU 2 included information on risk assessments that have evaluated impacts to human health and the environment. Information provided in the document formed the basis for the development of the Feasibility Study Report. This addendum includes revisions to four chapters of information that were a part of the document issued in January 1995. Specifically, it includes revisions to Chaps. 2, 3, 4, and 9. Volume 1 of this document is not being reissued in its entirety as a D3 version because only the four chapters just mentioned have been affected by requested changes. Note also that Volume 2 of this RI Report on Bear Creek Valley OU 2 is not being reissued in conjunction with Volume 1 of this document because there have been no changes requested or made to the previously issued version of Volume 2 of this document.

  15. Remedial investigation/feasibility study for the Clinch River/Poplar Creek operable unit. Volume 2. Appendixes A, B, C, D

    International Nuclear Information System (INIS)

    1995-09-01

    This document contains appendices A (water characterization), B (sediment characterization), C (biota Characterization), D (applicable or relevant and appropriate requirements) from the combined Remedial Investigation/Feasibility Study Report for the Clinch River/Poplar Crack (CR/PC) Operable Unit (OU). The CR/PC OU is located in Anderson and Roane Counties, Tennessee and consists of the Clinch River and several of its embayments in Melton Hill and Watts Bar Reservoirs. These waters have received hazardous substances released over a period of 50 years from the US Department of Energy's Oak Ridge Reservation (ORR), a National Priority List site established under the Comprehensive Environmental Response, Compensation, and Liability Act. A remedial investigation has been conducted to determine the current nature and extent of any contamination and to assess the resulting risk to human health and the environment. The feasibility study evaluates remedial action alternatives to identify any that are feasible for implementation and that would effectively reduce risk. Historical studies had indicated that current problems would likely include 137 Cs in sediment of the Clinch River, mercury in sediment and fish of Poplar Creek and PCBs and pesticides in fish from throughout the OU. Peak releases of mercury and 137 Cs occurred over 35 years ago, and current releases are low. Past releases of PCBs from the ORR are poorly quantified, and current releases are difficult to quantify because levels are so low. The site characterization focused on contaminants in surface water, sediment, and biota. Contaminants in surface water were all found to be below Ambient Water Quality Criteria. Other findings included the following: elevated metals including cesium 137 and mercury in McCoy Branch sediments; PCBs and chlordane elevated in several fish species, presenting the only major human health risk, significant ecological risks in Poplar Creek but not in the Clinch River

  16. Remedial investigation/feasibility study for the Clinch River/Poplar Creek operable unit. Volume 2. Appendixes A, B, C, D

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    This document contains appendices A (water characterization), B (sediment characterization), C (biota Characterization), D (applicable or relevant and appropriate requirements) from the combined Remedial Investigation/Feasibility Study Report for the Clinch River/Poplar Crack (CR/PC) Operable Unit (OU). The CR/PC OU is located in Anderson and Roane Counties, Tennessee and consists of the Clinch River and several of its embayments in Melton Hill and Watts Bar Reservoirs. These waters have received hazardous substances released over a period of 50 years from the US Department of Energy`s Oak Ridge Reservation (ORR), a National Priority List site established under the Comprehensive Environmental Response, Compensation, and Liability Act. A remedial investigation has been conducted to determine the current nature and extent of any contamination and to assess the resulting risk to human health and the environment. The feasibility study evaluates remedial action alternatives to identify any that are feasible for implementation and that would effectively reduce risk. Historical studies had indicated that current problems would likely include {sup 137}Cs in sediment of the Clinch River, mercury in sediment and fish of Poplar Creek and PCBs and pesticides in fish from throughout the OU. Peak releases of mercury and {sup 137}Cs occurred over 35 years ago, and current releases are low. Past releases of PCBs from the ORR are poorly quantified, and current releases are difficult to quantify because levels are so low. The site characterization focused on contaminants in surface water, sediment, and biota. Contaminants in surface water were all found to be below Ambient Water Quality Criteria. Other findings included the following: elevated metals including cesium 137 and mercury in McCoy Branch sediments; PCBs and chlordane elevated in several fish species, presenting the only major human health risk, significant ecological risks in Poplar Creek but not in the Clinch River.

  17. Evaluation of potential severe accidents during low power and shutdown operations at Surry, Unit 1: Analysis of core damage frequency from internal events during mid-loop operations, Appendices A--D. Volume 2, Part 2

    International Nuclear Information System (INIS)

    Chu, T.L.; Musicki, Z.; Kohut, P.

    1994-06-01

    During 1989, the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the Potential risks during low Power and shutdown operations. The program includes two parallel projects being performed by Brookhaven National Laboratory (BNL) and Sandia National Laboratories (SNL). Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the Plants to be studied. The objectives of the program are to assess the risks of severe accidents initiated during plant operational states other than full power operation and to compare the estimated core damage frequencies, important accident sequences and other qualitative and quantitative results with those accidents initiated during full power operation as assessed in NUREG-1150. The objective of this report is to document the approach utilized in the Surry plant and discuss the results obtained. A parallel report for the Grand Gulf plant is prepared by SNL. This study shows that the core-damage frequency during mid-loop operation at the Surry plant is comparable to that of power operation. We recognize that there is very large uncertainty in the human error probabilities in this study. This study identified that only a few procedures are available for mitigating accidents that may occur during shutdown. Procedures written specifically for shutdown accidents would be useful. This document, Volume 2, Pt. 2 provides appendices A through D of this report

  18. Evaluation of potential severe accidents during low power and shutdown operations at Surry, Unit 1: Analysis of core damage frequency from internal events during mid-loop operations, Appendices A--D. Volume 2, Part 2

    Energy Technology Data Exchange (ETDEWEB)

    Chu, T.L.; Musicki, Z.; Kohut, P. [Brookhaven National Lab., Upton, NY (United States)] [and others

    1994-06-01

    During 1989, the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the Potential risks during low Power and shutdown operations. The program includes two parallel projects being performed by Brookhaven National Laboratory (BNL) and Sandia National Laboratories (SNL). Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the Plants to be studied. The objectives of the program are to assess the risks of severe accidents initiated during plant operational states other than full power operation and to compare the estimated core damage frequencies, important accident sequences and other qualitative and quantitative results with those accidents initiated during full power operation as assessed in NUREG-1150. The objective of this report is to document the approach utilized in the Surry plant and discuss the results obtained. A parallel report for the Grand Gulf plant is prepared by SNL. This study shows that the core-damage frequency during mid-loop operation at the Surry plant is comparable to that of power operation. We recognize that there is very large uncertainty in the human error probabilities in this study. This study identified that only a few procedures are available for mitigating accidents that may occur during shutdown. Procedures written specifically for shutdown accidents would be useful. This document, Volume 2, Pt. 2 provides appendices A through D of this report.

  19. Evaluation of potential severe accidents during low power and shutdown operations at Surry, Unit-1: Analysis of core damage frequency from internal events during mid-loop operations. Appendix I, Volume 2, Part 5

    Energy Technology Data Exchange (ETDEWEB)

    Chu, T.L.; Musicki, Z.; Kohut, P.; Yang, J.; Bozoki, G.; Hsu, C.J.; Diamond, D.J. [Brookhaven National Lab., Upton, NY (United States); Bley, D.; Johnson, D. [PLG Inc., Newport Beach, CA (United States); Holmes, B. [AEA Technology, Dorset (United Kingdom)] [and others

    1994-06-01

    Traditionally, probabilistic risk assessments (PRA) of severe accidents in nuclear power plants have considered initiating events potentially occurring only during full power operation. Some previous screening analyses that were performed for other modes of operation suggested that risks during those modes were small relative to full power operation. However, more recent studies and operational experience have implied that accidents during low power and shutdown could be significant contributors to risk. During 1989, the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the potential risks during low power and shutdown operations. The program includes two parallel projects being performed by Brookhaven National Lab. (BNL) and Sandia National Labs. (SNL). Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the plants to be studied. The objectives of the program are to assess the risks of severe accidents initiated during plant operational states other than full power operation and to compare the estimated core damage frequencies, important accident sequences and other qualitative and quantitative results with those accidents initiated during full power operation as assessed in NUREG-1150. The objective of this volume of the report is to document the approach utilized in the level-1 internal events PRA for the Surry plant, and discuss the results obtained. A phased approach was used in the level-1 program. In phase 1, which was completed in Fall 1991, a coarse screening analysis examining accidents initiated by internal events (including internal fire and flood) was performed for all plant operational states (POSs). The objective of the phase 1 study was to identify potential vulnerable plant configurations, to characterize (on a high, medium, or low basis) the potential core damage accident scenarios, and to provide a foundation for a detailed phase 2 analysis.

  20. Evaluation of potential severe accidents during low power and shutdown operations at Surry, Unit-1: Analysis of core damage frequency from internal events during mid-loop operations. Appendix I, Volume 2, Part 5

    International Nuclear Information System (INIS)

    Chu, T.L.; Musicki, Z.; Kohut, P.; Yang, J.; Bozoki, G.; Hsu, C.J.; Diamond, D.J.; Bley, D.; Johnson, D.; Holmes, B.

    1994-06-01

    Traditionally, probabilistic risk assessments (PRA) of severe accidents in nuclear power plants have considered initiating events potentially occurring only during full power operation. Some previous screening analyses that were performed for other modes of operation suggested that risks during those modes were small relative to full power operation. However, more recent studies and operational experience have implied that accidents during low power and shutdown could be significant contributors to risk. During 1989, the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the potential risks during low power and shutdown operations. The program includes two parallel projects being performed by Brookhaven National Lab. (BNL) and Sandia National Labs. (SNL). Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the plants to be studied. The objectives of the program are to assess the risks of severe accidents initiated during plant operational states other than full power operation and to compare the estimated core damage frequencies, important accident sequences and other qualitative and quantitative results with those accidents initiated during full power operation as assessed in NUREG-1150. The objective of this volume of the report is to document the approach utilized in the level-1 internal events PRA for the Surry plant, and discuss the results obtained. A phased approach was used in the level-1 program. In phase 1, which was completed in Fall 1991, a coarse screening analysis examining accidents initiated by internal events (including internal fire and flood) was performed for all plant operational states (POSs). The objective of the phase 1 study was to identify potential vulnerable plant configurations, to characterize (on a high, medium, or low basis) the potential core damage accident scenarios, and to provide a foundation for a detailed phase 2 analysis

  1. Evaluation of potential severe accidents during low power and shutdown operations at Grand Gulf, Unit 1: Analysis of core damage frequency from internally induced flooding events for Plant Operational State 5 during a refueling outage. Volume 4

    International Nuclear Information System (INIS)

    Dandini, V.; Staple, B.; Kirk, H.; Whitehead, D.; Forester, J.

    1994-07-01

    An estimate of the contribution of internal flooding to the mean core damage frequency at the Grand Gulf Nuclear Station was calculated for Plant Operational State 5 during a refueling outage. Pursuant to this objective, flood zones and sources were identified and flood volumes were calculated. Equipment necessary for the maintenance of plant safety was identified and its vulnerability to flooding was determined. Event trees and fault trees were modified or developed as required, and PRA quantification was performed using the IRRAS code. The mean core damage frequency estimate for GGNS during POS 5 was found to be 2.3 E-8 per year

  2. Lung-protective ventilation in intensive care unit and operation room : Tidal volume size, level of positive end-expiratory pressure and driving pressure

    NARCIS (Netherlands)

    Serpa Neto, A.

    2017-01-01

    Several investigations have shown independent associations between three ventilator settings – tidal volume size, positive end–expiratory pressure (PEEP) and driving pressure – and outcomes in patients with the acute respiratory distress syndrome (ARDS). There is an increasing notion that similar

  3. Evaluation of potential severe accidents during low power and shutdown operations at Grand Gulf, Unit 1: Analysis of core damage frequency from internal fire events for Plant Operational State 5 during a refueling outage. Volume 3

    International Nuclear Information System (INIS)

    Lambright, J.; Yakle, J.

    1994-07-01

    This report, Volume 3, presents the details of the analysis of core damage frequency due to fire during shutdown Plant Operational State 5 at the Grand Gulf Nuclear Station. Insights from previous fire analyses (Peach Bottom, Surry, LaSalle) were used to the greatest extent possible in this analysis. The fire analysis was fully integrated utilizing the same event trees and fault trees that were used in the internal events analysis. In assessing shutdown risk due to fire at Grand Gulf, a detailed screening was performed which included the following elements: (a) Computer-aided vital area analysis; (b) Plant inspections; (c) Credit for automatic fire protection systems; (d) Recovery of random failures; (e) Detailed fire propagation modeling. This screening process revealed that all plant areas had a negligible (<1.0E-8 per year) contribution to fire-induced core damage frequency

  4. Evaluation of potential severe accidents during low power and shutdown operations at Surry, Unit 1. Volume 5: Analysis of core damage frequency from seismic events during mid-loop operations

    International Nuclear Information System (INIS)

    Budnitz, R.J.; Davis, P.R.; Ravindra, M.K.; Tong, W.H.

    1994-08-01

    In 1989 the US Nuclear Regulatory Commission (NRC) initiated an extensive program to examine carefully the potential risks during low-power and shutdown operations. The program included two parallel projects, one at Brookhaven National Laboratory studying a pressurized water reactor (Surry Unit 1) and the other at Sandia National Laboratories studying a boiling water reactor (Grand Gulf). Both the Brookhaven and Sandia projects have examined only accidents initiated by internal plant faults--so-called ''internal initiators.'' This project, which has explored the likelihood of seismic-initiated core damage accidents during refueling shutdown conditions, is complementary to the internal-initiator analyses at Brookhaven and Sandia. This report covers the seismic analysis at Surry Unit 1. All of the many systems modeling assumptions, component non-seismic failure rates, and human error rates that were used in the internal-initiator study at Surry have been adopted here, so that the results of the two studies can be as comparable as possible. Both the Brookhaven study and this study examine only two shutdown plant operating states (POSs) during refueling outages at Surry, called POS 6 and POS 10, which represent mid-loop operation before and after refueling, respectively. This analysis has been limited to work analogous to a level-1 seismic PRA, in which estimates have been developed for the core-damage frequency from seismic events during POSs 6 and 10. The results of the analysis are that the core-damage frequency of earthquake-initiated accidents during refueling outages in POS 6 and POS 10 is found to be low in absolute terms, less than 10 -6 /year

  5. Small Aircraft Transportation System, Higher Volume Operations Concept: Normal Operations

    Science.gov (United States)

    Abbott, Terence S.; Jones, Kenneth M.; Consiglio, Maria C.; Williams, Daniel M.; Adams, Catherine A.

    2004-01-01

    This document defines the Small Aircraft Transportation System (SATS), Higher Volume Operations (HVO) concept for normal conditions. In this concept, a block of airspace would be established around designated non-towered, non-radar airports during periods of poor weather. Within this new airspace, pilots would take responsibility for separation assurance between their aircraft and other similarly equipped aircraft. Using onboard equipment and procedures, they would then approach and land at the airport. Departures would be handled in a similar fashion. The details for this operational concept are provided in this document.

  6. Physical protection of nuclear operational units

    International Nuclear Information System (INIS)

    1981-07-01

    The general principles of and basic requirements for the physical protection of operational units in the nuclear field are established. They concern the operational units whose activities are related with production, utilization, processing, reprocessing, handling, transport or storage of materials of interest for the Brazilian Nuclear Program. (I.C.R.) [pt

  7. Junior Leader Training Development in Operational Units

    Science.gov (United States)

    2012-04-01

    UNITS Successful operational units do not arise without tough, realistic, and challenging training. Field Manual (FM) 7-0, Training Units and D...operations. The manual provides junior leaders with guidance on how to conduct training and training management. Of particular importance is the definition...1 Relation htp between ADDIE and the Anny Training Management Model. The Army Training Management Model and ADDIE process appear in TRADOC PAM 350

  8. OPERATIONAL DISTRIBUTION OF THE TRAIN TRAFFIC VOLUME ON THE SECTIONS OF RAILWAY OPERATING DOMAIN

    Directory of Open Access Journals (Sweden)

    G. Ya. Моzolevich

    2013-10-01

    Full Text Available Purpose. The task of the operational distribution of train traffic volume on the sections of operating domain is the optimization one. It is solved in the operational conditions by the dispatch station. The article sets the problem of formalizing and finding the new ways to solve this urgent problem. Methodology. A new approach to solving the problem of operational distribution of train traffic volume on the sections of the rail network with a choice of routes for all train traffics was proposed. Findings. A study of possible routes for the train traffic handle on the operating domain used for mass freight transportations between Krivyi Rih and Donbas was carried out. The use of the proposed method allowed us to obtain a rational distribution of trains on the rail network sections. Originality. The method of train traffic volume distribution in the network under operational conditions was improved. The method, as opposed to the current one allows one to select the route of separate units handle (according to the criteria of the weighted average cost for 1 ton of cargo. Practical value. The use of the proposed technology of the operational distribution of train traffic volume will increase the efficiency of the railways in general and ensure the competitiveness of rail transportations. The methodology implementation involves the use of railway dispatch station for the automated workplaces with appropriate informational support.

  9. Remedial investigation/feasibility study of the Clinch River/Poplar Creek Operable Unit. Volume 2. Appendixes A, B, C, and D-Biota and representative concentrations of contaminants

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-06-01

    This report presents the findings of an investigation into contamination of the Clinch River and Poplar Creek near the U.S. Department of Energy`s (DOE`s) Oak Ridge Reservation (ORR) in eastern Tennessee. For more than 50 years, various hazardous and radioactive substances have been released to the environment as a result of operations and waste management activities at the ORR. In 1989, the ORR was placed on the National Priorities List (NPL), established and maintained under the federal Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under CERCLA, NPL sites must be investigated to determine the nature and extent of contamination at the site, assess the risk to human health and the environment posed by the site, and, if necessary, identify feasible remedial alternatives that could be used to clean the site and reduce risk. To facilitate the overall environmental restoration effort at the ORR, CERCLA activities are being implemented individually as distinct operable units (OUs). This document is Volume 2 of the combined Remedial Investigation and Feasibility Study Report for the Clinch River/Poplar Creek OU.

  10. Remedial investigation/feasibility study of the Clinch River/Poplar Creek Operable Unit. Volume 4. Appendixes G, H, and I and information related to the feasibility study and ARARs

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-06-01

    This report presents the findings of an investigation into contamination of the Clinch River and Poplar Creek near the U.S. Department of Energy`s (DOE`s) Oak Ridge Reservation (ORR) in eastern Tennessee. For more than 50 years, various hazardous and radioactive substances have been released to the environment as a result of operations and waste management activities at the ORR. In 1989, the ORR was placed on the National Priorities List (NPL), established and maintained under the federal Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under CERCLA, NPL sites must be investigated to determine the nature and extent of contamination at the site, assess the risk to human health and the environment posed by the site, and, if necessary, identify feasible remedial alternatives that could be used to clean the site and reduce risk. To facilitate the overall environmental restoration effort at the ORR, CERCLA activities are being implemented individually as distinct operable units (OUs). This document is Volume 4 of the combined Remedial Investigation and Feasibility Study Report for the Clinch River/Poplar Creek OU.

  11. Evaluation of potential severe accidents during low power and shutdown operations at Grand Gulf, Unit 1. Volume 5: Analysis of core damage frequency from seismic events for plant operational state 5 during a refueling outage

    International Nuclear Information System (INIS)

    Budnitz, R.J.; Davis, P.R.; Ravindra, M.K.; Tong, W.H.

    1994-08-01

    In 1989 the US Nuclear Regulatory Commission (NRC) initiated an extensive program to examine carefully the potential risks during low-power and shutdown operations. The program included two parallel projects, one at Sandia National Laboratories studying a boiling water reactor (Grand Gulf), and the other at Brookhaven National Laboratory studying a pressurized water reactor (Surry Unit 1). Both the Sandia and Brookhaven projects have examined only accidents initiated by internal plant faults---so-called ''internal initiators.'' This project, which has explored the likelihood of seismic-initiated core damage accidents during refueling outage conditions, is complementary to the internal-initiator analyses at Brookhaven and Sandia. This report covers the seismic analysis at Grand Gulf. All of the many systems modeling assumptions, component non-seismic failure rates, and human effort rates that were used in the internal-initiator study at Grand Gulf have been adopted here, so that the results of the study can be as comparable as possible. Both the Sandia study and this study examine only one shutdown plant operating state (POS) at Grand Gulf, namely POS 5 representing cold shutdown during a refueling outage. This analysis has been limited to work analogous to a level-1 seismic PRA, in which estimates have been developed for the core-damage frequency from seismic events during POS 5. The results of the analysis are that the core-damage frequency for earthquake-initiated accidents during refueling outages in POS 5 is found to be quite low in absolute terms, less than 10 -7 /year

  12. Centrifugal microfluidic platforms: advanced unit operations and applications.

    Science.gov (United States)

    Strohmeier, O; Keller, M; Schwemmer, F; Zehnle, S; Mark, D; von Stetten, F; Zengerle, R; Paust, N

    2015-10-07

    Centrifugal microfluidics has evolved into a mature technology. Several major diagnostic companies either have products on the market or are currently evaluating centrifugal microfluidics for product development. The fields of application are widespread and include clinical chemistry, immunodiagnostics and protein analysis, cell handling, molecular diagnostics, as well as food, water, and soil analysis. Nevertheless, new fluidic functions and applications that expand the possibilities of centrifugal microfluidics are being introduced at a high pace. In this review, we first present an up-to-date comprehensive overview of centrifugal microfluidic unit operations. Then, we introduce the term "process chain" to review how these unit operations can be combined for the automation of laboratory workflows. Such aggregation of basic functionalities enables efficient fluidic design at a higher level of integration. Furthermore, we analyze how novel, ground-breaking unit operations may foster the integration of more complex applications. Among these are the storage of pneumatic energy to realize complex switching sequences or to pump liquids radially inward, as well as the complete pre-storage and release of reagents. In this context, centrifugal microfluidics provides major advantages over other microfluidic actuation principles: the pulse-free inertial liquid propulsion provided by centrifugal microfluidics allows for closed fluidic systems that are free of any interfaces to external pumps. Processed volumes are easily scalable from nanoliters to milliliters. Volume forces can be adjusted by rotation and thus, even for very small volumes, surface forces may easily be overcome in the centrifugal gravity field which enables the efficient separation of nanoliter volumes from channels, chambers or sensor matrixes as well as the removal of any disturbing bubbles. In summary, centrifugal microfluidics takes advantage of a comprehensive set of fluidic unit operations such as

  13. Nuclear units operating improvement by using operating experience

    International Nuclear Information System (INIS)

    Rotaru, I.; Bilegan, I.C.

    1997-01-01

    The paper presents how the information experience can be used to improve the operation of nuclear units. This areas include the following items: conservative decision making; supervisory oversight; teamwork; control room distraction; communications; expectations and standards; operator training and fundamental knowledge, procedure quality and adherence; plant status awareness. For each of these topics, the information illustrate which are the principles, the lessons learned from operating experience and the most appropriate exemplifying documents. (authors)

  14. Evaluation of potential severe accidents during low power and shutdown operations at Surry, Unit 1: Analysis of core damage frequency from internal events during mid-loop operations, Main report (Chapters 7--12). Volume 2, Part 1B

    International Nuclear Information System (INIS)

    Chu, T.L.; Musicki, Z.; Kohut, P.

    1994-06-01

    During 1989, the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the potential risks during low power and shutdown operations. The program includes two parallel projects being performed by Brookhaven National Laboratory (BNL) and Sandia National Laboratories (SNL). Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the plants to be studied. The objectives of the program are to assess the risks of severe accidents initiated during plant operational states other than full power operation and to compare the estimated core damage frequencies, important accident sequences and other qualitative and quantitative results with those accidents initiated during full power operation as assessed in NUREG-1150. The objective of this report is to document the approach utilized in the Surry plant and discuss the results obtained. A parallel report for the Grand Gulf plant is prepared by SNL. This study shows that the core-damage frequency during mid-loop operation at the Surry plant is comparable to that of power operation. We recognize that there is very large uncertainty in the human error probabilities in this study. This study identified that only a few procedures are available for mitigating accidents that may occur during shutdown. Procedures written specific shutdown accidents would be useful

  15. Evaluation of potential severe accidents during low power and shutdown operations at Surry, Unit 1: Analysis of core damage frequency from internal fires during mid-loop operations. Volume 3, Part 1, Main report

    International Nuclear Information System (INIS)

    Musicki, Z.; Chu, T.L.; Yang, J.; Ho, V.; Hou, Y.M.; Lin, J.; Siu, N.

    1994-07-01

    During l989, the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the potential risks during low power and shutdown operations. The program includes two parallel projects being performed by Brookhaven National Laboratory (BNL) and Sandia National Laboratories (SNL). Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the plants to be studied. The objectives of the program are to assess the risks of severe accidents initiated during plant operational states other than fun power operation and to compare the estimated core damage frequencies, important accident sequences and other qualitative and quantitative results with those accidents initiated during full power operation as assessed in NUREG-1150. The objective of this report is to document the approach utilized in ' the Surry plant and discuss the results obtained. A parallel report for the Grand Gulf plant is prepared by SNL. This study shows that the core-damage frequency during mid-loop operation at the Surry plant is comparable to that of power operation. We recognize that there is very large uncertainty in the human error probabilities in this study. This study identified that only a few. procedures are available for mitigating accidents that may occur during shutdown. Procedures written specifically for shutdown accidents would be useful

  16. Evaluation of potential severe accidents during low power and shutdown operations at Surry, Unit 1: Analysis of core damage frequency from internal events during mid-loop operations, Appendices E (Sections E.1--E.8). Volume 2, Part 3A

    International Nuclear Information System (INIS)

    Chu, T.L.; Musicki, Z.; Kohut, P.

    1994-06-01

    During 1989, the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the potential risks during low power and shutdown operations. The program includes two parallel projects being performed by Brookhaven National Laboratory (BNL) and Sandia National Laboratories (SNL). Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the plants to be studied. The objectives of the program are to assess the risks of severe accidents initiated during plant operational states other than full power operation and to compare the estimated core damage frequencies, important accident sequences and other qualitative and quantitative results with those accidents initiated during full power operation as assessed in NUREG-1150. The objective of this report is to document the approach utilized in the Surry plant and discuss the results obtained. A parallel report for the Grand Gulf plant is prepared by SNL. This study shows that the core-damage frequency during mid-loop operation at the Surry plant is comparable to that of power operation. The authors recognize that there is very large uncertainty in the human error probabilities in this study. This study identified that only a few procedures are available for mitigating accidents that may occur during shutdown. Procedures written specifically for shutdown accidents would be useful

  17. Evaluation of potential severe accidents during low power and shutdown operations at Surry, Unit 1: Analysis of core damage frequency from internal events during mid-loop operations, Main report (Chapters 1--6). Volume 2, Part 1A

    International Nuclear Information System (INIS)

    Chu, T.L.; Musicki, Z.; Kohut, P.

    1992-06-01

    During 1989, the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the potential risks during low power and shutdown operations. The program includes two parallel projects being performed by Brookhaven National Laboratory (BNL) and Sandia National Laboratories (SNL). Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the plants to be studied. The objectives of the program are to assess the risks of severe accidents initiated during plant operational states other than full power operation and to compare the estimated core damage frequencies, important accident sequences and other qualitative and quantitative results with those accidents initiated during full power operation as assessed in NUREG-1150. The objective of this report is to document the approach utilized in the Surry plant and discuss the results obtained. A parallel report for the Grand Gulf plant is prepared by SNL. This study shows that the core-damage frequency during mid-loop operation at the Surry plant is comparable to that of power operation. We recognize that there is very large uncertainty in the human error probabilities in this study. This study identified that only a few procedures are available for mitigating accidents that may occur during shutdown written specifically for shutdown accidents would be useful. This document presents Chapters 1--6 of the report

  18. Surry Power Station, Units 1 and 2. Annual operating report: January--December 1977, volume I--introduction, summary of operating experience; changes, tests, experiments, and safety-related maintenance; effluent releases; data tabulations

    International Nuclear Information System (INIS)

    1978-01-01

    A chronological operating sequence including shutdowns and occurrences during the year which required load reductions or resulted in non-load related incidents is given. Data are presented concerning plant and procedure changes, tests, experiments, safety related maintenance, effluent releases and personnel radiation exposures

  19. Unpacking Referent Units in Fraction Operations

    Science.gov (United States)

    Philipp, Randolph A.; Hawthorne, Casey

    2015-01-01

    Although fraction operations are procedurally straightforward, they are complex, because they require learners to conceptualize different units and view quantities in multiple ways. Prospective secondary school teachers sometimes provide an algebraic explanation for inverting and multiplying when dividing fractions. That authors of this article…

  20. Preparing nuclear power plant units for operation

    International Nuclear Information System (INIS)

    Hudcovic, R.; Telgarsky, K.; Kmosena, J.

    1984-01-01

    The factors are listed which have to be taken into consideration for planning the unit operation, i.e., the implementation of planned repairs, checks of equipment and refuellings. All basic input data were evaluated as the basic for drawing up the schedule of routine repairs and overhauls for the coming period. (E.S.)

  1. Operating performance of LWR nuclear generating units

    International Nuclear Information System (INIS)

    Pia, S.

    1984-01-01

    This work aims at reviewing, on the basis of historical data, the operational problem areas which explain the degree of availability and productivity achieved up to now by nuclear power plants in commercial operation in the world. The operating performance data of nuclear power plants area analysed with respect to plant type, size and other significant reference parameters and they are evaluated also by comparison with fossil generating unit data. Major performance indices data are presented for both nuclear and fossil units type and distribution of outage causes. Unplanned full outages caused by nuclear power plant equipment and components failure are particulary emphasized. The trend for unplanned full outages due to the failure of components shows decreasing numerical values in 1981 with respect to the previous years. But this result should be weighed with the increasing plant unavailability hours needed for maintenance and repair action (chiefly preventive maintenance on critical components). This means that the number and downtime of forced outage must be drastically reduced for economic reasons (production losses and problems associated with the unavailable unit unplanned replacement) as well as for plant safe and reliable operation (sudden unavailability of key components and frequency of transients associated with plant shutdown and routine startup operation)

  2. Produced water volumes and management practices in the United States.

    Energy Technology Data Exchange (ETDEWEB)

    Clark, C. E.; Veil, J. A. (Environmental Science Division)

    2009-09-01

    Produced water volume generation and management in the United States are not well characterized at a national level. The U.S. Department of Energy (DOE) asked Argonne National Laboratory to compile data on produced water associated with oil and gas production to better understand the production volumes and management of this water. The purpose of this report is to improve understanding of produced water by providing detailed information on the volume of produced water generated in the United States and the ways in which produced water is disposed or reused. As the demand for fresh water resources increases, with no concomitant increase in surface or ground water supplies, alternate water sources, like produced water, may play an important role. Produced water is water from underground formations that is brought to the surface during oil or gas production. Because the water has been in contact with hydrocarbon-bearing formations, it contains some of the chemical characteristics of the formations and the hydrocarbons. It may include water from the reservoir, water previously injected into the formation, and any chemicals added during the production processes. The physical and chemical properties of produced water vary considerably depending on the geographic location of the field, the geologic formation, and the type of hydrocarbon product being produced. Produced water properties and volume also vary throughout the lifetime of a reservoir. Produced water is the largest volume by-product or waste stream associated with oil and gas exploration and production. Previous national produced water volume estimates are in the range of 15 to 20 billion barrels (bbl; 1 bbl = 42 U.S. gallons) generated each year in the United States (API 1988, 2000; Veil et al. 2004). However, the details on generation and management of produced water are not well understood on a national scale. Argonne National Laboratory developed detailed national-level information on the volume of produced

  3. The Small Aircraft Transportation System (SATS), Higher Volume Operations (HVO) Off-Nominal Operations

    Science.gov (United States)

    Baxley, B.; Williams, D.; Consiglio, M.; Conway, S.; Adams, C.; Abbott, T.

    2005-01-01

    The ability to conduct concurrent, multiple aircraft operations in poor weather, at virtually any airport, offers an important opportunity for a significant increase in the rate of flight operations, a major improvement in passenger convenience, and the potential to foster growth of charter operations at small airports. The Small Aircraft Transportation System, (SATS) Higher Volume Operations (HVO) concept is designed to increase traffic flow at any of the 3400 nonradar, non-towered airports in the United States where operations are currently restricted to one-in/one-out procedural separation during Instrument Meteorological Conditions (IMC). The concept's key feature is pilots maintain their own separation from other aircraft using procedures, aircraft flight data sent via air-to-air datalink, cockpit displays, and on-board software. This is done within the Self-Controlled Area (SCA), an area of flight operations established during poor visibility or low ceilings around an airport without Air Traffic Control (ATC) services. The research described in this paper expands the HVO concept to include most off-nominal situations that could be expected to occur in a future SATS environment. The situations were categorized into routine off-nominal operations, procedural deviations, equipment malfunctions, and aircraft emergencies. The combination of normal and off-nominal HVO procedures provides evidence for an operational concept that is safe, requires little ground infrastructure, and enables concurrent flight operations in poor weather.

  4. Evaluation of potential severe accidents during low power and shutdown operations at Surry, Unit 1: Analysis of core damage frequency from internal floods during mid-loop operations. Volume 4

    International Nuclear Information System (INIS)

    Kohut, P.

    1994-07-01

    The major objective of the Surry internal flood analysis was to provide an improved understanding of the core damage scenarios arising from internal flood-related events. The mean core damage frequency of the Surry plant due to internal flood events during mid-loop operations is 4.8E-06 per year, and the 5th and 95th percentiles are 2.2E-07 and 1.8E-05 per year, respectively. Some limited sensitivity calculations were performed on three plant improvement options. The most significant result involves modifications of intake-level structure on the canal, which reduced core damage frequency contribution from floods in mid-loop by about 75%

  5. 200-UP-2 operable unit radiological surveys

    International Nuclear Information System (INIS)

    Wendling, M.A.

    1994-01-01

    This report summarizes and documents the results of the radiological surveys conducted from August 17 through December 16, 1993 over a partial area of the 200-UP-2 Operable Unit, 200-W Area, Hanford Site, Richland, Washington. In addition, this report explains the survey methodology of the Mobile Surface Contamination Monitor 11 (MSCM-II) and the Ultra Sonic Ranging And Data System (USRADS). The radiological survey of the 200-UP-2 Operable Unit was conducted by the Site Investigative Surveys/Environmental Restoration Health Physics Organization of the Westinghouse Hanford Company. The survey methodology for the majority of area was based on utilization of the MSCM-II or the USRADS for automated recording of the gross beta/gamma radiation levels at or near six (6) inches from the surface soil

  6. Remedial investigation report on Bear Creek Valley Operable Unit 2 (rust spoil area, spoil area 1, and SY-200 yard) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Volume 2. Appendixes

    Energy Technology Data Exchange (ETDEWEB)

    1994-08-01

    This document contains the appendices to the Remedial Investigation Report on Bear Creek Valley Operable Unit 2 (Rust Spoil Area, Spoil Area 1, and SY-200 Yard) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. The appendices include Current and historical soil boring and groundwater monitoring well information, well construction logs, and field change orders; Analytical data; Human health risk assessment data; and Data quality.

  7. Remedial investigation report on Bear Creek Valley Operable Unit 2 (rust spoil area, spoil area 1, and SY-200 yard) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Volume 2. Appendixes

    International Nuclear Information System (INIS)

    1994-08-01

    This document contains the appendices to the Remedial Investigation Report on Bear Creek Valley Operable Unit 2 (Rust Spoil Area, Spoil Area 1, and SY-200 Yard) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. The appendices include Current and historical soil boring and groundwater monitoring well information, well construction logs, and field change orders; Analytical data; Human health risk assessment data; and Data quality

  8. Remedial investigation report on Chestnut Ridge Operable Unit 2 (filled coal ash pond/Upper McCoy Branch) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Volume 2: Appendixes

    Energy Technology Data Exchange (ETDEWEB)

    1994-08-01

    This report comprises appendices A--J which support the Y-12 Plant`s remedial action report involving Chestnut Ridge Operable Unit 2 (filled coal ash pond/Upper McCoy Branch). The appendices cover the following: Sampling fish from McCoy Branch; well and piezometer logs; ecological effects of contaminants in McCoy Branch 1989-1990; heavy metal bioaccumulation data; microbes in polluted sediments; and baseline human health risk assessment data.

  9. Remedial investigation report on Chestnut Ridge Operable Unit 2 (filled coal ash pond/Upper McCoy Branch) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Volume 2: Appendixes

    International Nuclear Information System (INIS)

    1994-08-01

    This report comprises appendices A--J which support the Y-12 Plant's remedial action report involving Chestnut Ridge Operable Unit 2 (filled coal ash pond/Upper McCoy Branch). The appendices cover the following: Sampling fish from McCoy Branch; well and piezometer logs; ecological effects of contaminants in McCoy Branch 1989-1990; heavy metal bioaccumulation data; microbes in polluted sediments; and baseline human health risk assessment data

  10. Operational waste volume projection. Revision 20

    International Nuclear Information System (INIS)

    Koreski, G.M.; Strode, J.N.

    1994-01-01

    Waste receipts to the double-shell tank system are analyzed and wastes through the year 2015 are projected based on generation trends of the past 12 months. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement. Assumptions were current as of July 1994

  11. An operator calculus for surface and volume modeling

    Science.gov (United States)

    Gordon, W. J.

    1984-01-01

    The mathematical techniques which form the foundation for most of the surface and volume modeling techniques used in practice are briefly described. An outline of what may be termed an operator calculus for the approximation and interpolation of functions of more than one independent variable is presented. By considering the linear operators associated with bivariate and multivariate interpolation/approximation schemes, it is shown how they can be compounded by operator multiplication and Boolean addition to obtain a distributive lattice of approximation operators. It is then demonstrated via specific examples how this operator calculus leads to practical techniques for sculptured surface and volume modeling.

  12. HDS unit revamp and operating experience

    Energy Technology Data Exchange (ETDEWEB)

    Reinhardt, J. [Veba Oel Verarbeitungs-GmbH, Gelsenkirchen (Germany); Balfanz, U. [Aral Forschung, Gelsenkirchen (Germany); Dimmig, T. [TU Bergakademie Freiberg, Freiberg (Germany)

    2002-12-01

    Ruhr Oel GmbH, a joint venture between BP and PDVSA, operates a HDS unit at its Gelsenkirchen-Scholven site. The unit produces a major blend component for diesel fuel. Driven by ambitious German environmental policy and by an agreement between the German car and oil industries on the one hand and the government on the other, more stringent low sulphur fuel specifications will be enforced in Germany much earlier than in the rest of the European Union. In view of this situation a project was developed to fulfill the new product specifications with minimum investment. In a joint effort involving the refinery, the company research facilities and the catalyst supplier (AKZO NOBEL), pilot plant tests were performed to develop the best catalyst system and the new process conditions. Based on these results, an existing HDS unit was accordingly revamped. After the revamp, the unit produced diesel fuel with 50 ppm sulphur content and furthermore test runs at 10 ppm were carried out successfully. These results are displayed in this article. (orig.)

  13. OPERATION CASTLE. Radiological Safety. Volume 1

    Science.gov (United States)

    1985-09-01

    soil around ground zero and to fall-out. e. Pollcwing the detonation, personnel entering shot areas will be exposed to beta particles and gamma...rays coining from induced neutron activity in the soil and any fission products which might have been deposited on the ground. There may also be a...Oceanography, La Jolla, California; Health Diviaion, USL , Los Alaraos, and the laboratory record! of Task Unit 7* It is folt that this study may be

  14. Habitat Demonstration Unit Medical Operations Workstation Upgrades

    Science.gov (United States)

    Trageser, Katherine H.

    2011-01-01

    This paper provides an overview of the design and fabrication associated with upgrades for the Medical Operations Workstation in the Habitat Demonstration Unit. The work spanned a ten week period. The upgrades will be used during the 2011 Desert Research and Technology Studies (Desert RATS) field campaign. Upgrades include a deployable privacy curtain system, a deployable tray table, an easily accessible biological waste container, reorganization and labeling of the medical supplies, and installation of a retractable camera. All of the items were completed within the ten week period.

  15. When high-volume PCI operators in high-volume hospitals move to lower volume hospitals-Do they still maintain high volume and quality of outcomes?

    Science.gov (United States)

    Lu, Tsung-Hsueh; Li, Sheng-Tun; Liang, Fu-Wen; Lee, Jo-Chi; Yin, Wei-Hsian

    2017-10-31

    The aim of this quasi-experimental study was to examine whether high-volume percutaneous coronary intervention (PCI) operators still maintain high volume and quality of outcomes when they moved to lower volume hospitals. Systematic reviews have indicated that high-volume PCI operators and hospitals have higher quality outcomes. However, little is known on whether high PCI volume and high quality outcomes are mainly due to operator characteristics (i.e., skill and experience) and is portable across organizations or whether it is due to hospital characteristics (i.e., equipment, team, and management system) and is less portable. We used Taiwan National Health Insurance claims data 2000-2012 to identify 98 high-volume PCI operators, 10 of whom moved from one hospital to another during the study period. We compared the PCI volume, risk-adjusted mortality ratio, and major adverse cardiovascular event (MACE) ratio before and after moving. Of the 10 high-volume operators who moved, 6 moved from high- to moderate- or low-volume hospitals, with median annual PCI volumes (interquartile range) of 130 (117-165) in prior hospitals and 54 (46-84) in subsequent hospitals (the hospital the operator moved to), and the remaining 4 moved from high to high-volume hospitals, with median annual PCI volumes (interquartile range) of 151 (133-162) in prior hospitals and 193 (178-239) in subsequent hospitals. No significant differences were observed in the risk-adjusted mortality ratios and MACE ratios between high-volume operators and matched controls before and after moving. High-volume operators cannot maintain high volume when they moved from high to moderate or low-volume hospitals; however, the quality of care is maintained. High PCI volume and high-quality outcomes are less portable and more hospital bound. © 2017 Wiley Periodicals, Inc.

  16. Risk-based decision analysis for groundwater operable units

    International Nuclear Information System (INIS)

    Chiaramonte, G.R.

    1995-01-01

    This document proposes a streamlined approach and methodology for performing risk assessment in support of interim remedial measure (IRM) decisions involving the remediation of contaminated groundwater on the Hanford Site. This methodology, referred to as ''risk-based decision analysis,'' also supports the specification of target cleanup volumes and provides a basis for design and operation of the groundwater remedies. The risk-based decision analysis can be completed within a short time frame and concisely documented. The risk-based decision analysis is more versatile than the qualitative risk assessment (QRA), because it not only supports the need for IRMs, but also provides criteria for defining the success of the IRMs and provides the risk-basis for decisions on final remedies. For these reasons, it is proposed that, for groundwater operable units, the risk-based decision analysis should replace the more elaborate, costly, and time-consuming QRA

  17. Data collection system. Volume 1, Overview and operators manual; Volume 2, Maintenance manual; Appendices

    Energy Technology Data Exchange (ETDEWEB)

    Caudell, R.B.; Bauder, M.E.; Boyer, W.B.; French, R.E.; Isidoro, R.J.; Kaestner, P.C.; Perkins, W.G.

    1993-09-01

    Sandia National Laboratories (SNL) Instrumentation Development Department was tasked by the Defense Nuclear Agency (DNA) to record data on Tektronix RTD720 Digitizers on the HUNTERS TROPHY field test conducted at the Nevada Test Site (NTS) on September 18, 1992. This report contains a overview and description of the computer hardware and software that was used to acquire, reduce, and display the data. The document is divided into two volumes: an overview and operators manual (Volume 1) and a maintenance manual (Volume 2).

  18. Remedial investigation report on Bear Creek Valley Operable Unit 2 (Rust Spoil Area, Spoil Area 1, and SY-200 Yard) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Volume 1, Main text

    International Nuclear Information System (INIS)

    1994-08-01

    The enactment of the Resource Conservation and Recovery Act (RCRA) in 1976 and the Hazardous and Solid Waste Amendments (HSWA) to RCRA in 1984 created management requirements for hazardous waste facilities. The facilities within the Oak Ridge Reservation (ORR) were in the process of meeting the RCRA requirements when the ORR was placed on the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) National Priorities List (NPL) on November 21, 1989. Under RCRA, the actions typically follow the RCRA Facility Assessment/RCRA Facility Investigation (RFI)/Corrective Measures Study (CMS)/Corrective Measures Implementation process. Under CERCLA, the actions follow the preliminary assessment/site investigation/Remedial Investigation (RI)/Feasibility Study (FS)/Remedial Design/Remedial Action process. This document incorporates requirements under both RCRA and CERCLA in the form of an RI report for the characterization of Bear Creek Valley (BCV) Operable Unit (OU) 2

  19. 200-BP-5 operable unit treatability test report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    The 200-BP-5 Operable Unit was established in response to recommendations presented in the 200 East Groundwater Aggregate Area Management Study Report (AAMSR) (DOE-RL 1993a). Recognizing different approaches to remediation, the groundwater AAMSR recommended separating groundwater from source and vadose zone operable units and subdividing 200 East Area groundwater into two operable units. The division between the 200-BP-5 and 200-PO-1 Operable Units was based principally on source operable unit boundaries and distribution of groundwater plumes derived from either B Plant or Plutonium/Uranium Extraction (PUREX) Plant liquid waste disposal sites.

  20. 200-BP-5 operable unit treatability test report

    International Nuclear Information System (INIS)

    1996-04-01

    The 200-BP-5 Operable Unit was established in response to recommendations presented in the 200 East Groundwater Aggregate Area Management Study Report (AAMSR) (DOE-RL 1993a). Recognizing different approaches to remediation, the groundwater AAMSR recommended separating groundwater from source and vadose zone operable units and subdividing 200 East Area groundwater into two operable units. The division between the 200-BP-5 and 200-PO-1 Operable Units was based principally on source operable unit boundaries and distribution of groundwater plumes derived from either B Plant or Plutonium/Uranium Extraction (PUREX) Plant liquid waste disposal sites

  1. Graphical calculus of volume, inverse volume and Hamiltonian operators in loop quantum gravity

    Energy Technology Data Exchange (ETDEWEB)

    Yang, Jinsong [Guizhou University, Department of Physics, Guiyang (China); Academia Sinica, Institute of Physics, Taipei (China); Ma, Yongge [Beijing Normal University, Department of Physics, Beijing (China)

    2017-04-15

    To adopt a practical method to calculate the action of geometrical operators on quantum states is a crucial task in loop quantum gravity. In this paper, the graphical calculus based on the original Brink graphical method is applied to loop quantum gravity along the line of previous work. The graphical method provides a very powerful technique for simplifying complicated calculations. The closed formula of the volume operator and the actions of the Euclidean Hamiltonian constraint operator and the so-called inverse volume operator on spin-network states with trivalent vertices are derived via the graphical method. By employing suitable and non-ambiguous graphs to represent the action of operators as well as the spin-network states, we use the simple rules of transforming graphs to obtain the resulting formula. Comparing with the complicated algebraic derivation in some literature, our procedure is more concise, intuitive and visual. The resulting matrix elements of the volume operator is compact and uniform, fitting for both gauge-invariant and gauge-variant spin-network states. Our results indicate some corrections to the existing results for the Hamiltonian operator and inverse volume operator in the literature. (orig.)

  2. Guide to the selection, training, and licensing or certification of reprocessing plant operators. Volume I

    International Nuclear Information System (INIS)

    1976-06-01

    The Code of Federal Regulations, Title 10, Part 55, establishes procedures and criteria for the licensing of operators, including senior operators, in ''Production and Utilization Facilities'', which includes plants for reprocessing irradiated fuel. A training guide is presented which will facilitate the licensing of operators for nuclear reprocessing plants by offering generalized descriptions of the basic principles (theory) and the unit operations (mechanics) employed in reprocessing spent fuels. In the present volume, details about the portions of a training program that are of major interest to management are presented

  3. Guide to the selection, training, and licensing or certification of reprocessing plant operators. Volume I

    Energy Technology Data Exchange (ETDEWEB)

    None

    1976-06-01

    The Code of Federal Regulations, Title 10, Part 55, establishes procedures and criteria for the licensing of operators, including senior operators, in ''Production and Utilization Facilities'', which includes plants for reprocessing irradiated fuel. A training guide is presented which will facilitate the licensing of operators for nuclear reprocessing plants by offering generalized descriptions of the basic principles (theory) and the unit operations (mechanics) employed in reprocessing spent fuels. In the present volume, details about the portions of a training program that are of major interest to management are presented. (JSR)

  4. Eigenvalues of the volume operator in loop quantum gravity

    International Nuclear Information System (INIS)

    Meissner, Krzysztof A

    2006-01-01

    We present a simple method to calculate certain sums of the eigenvalues of the volume operator in loop quantum gravity. We derive the asymptotic distribution of the eigenvalues in the classical limit of very large spins, which turns out to be of a very simple form. The results can be useful for example in the statistical approach to quantum gravity

  5. Trial operation of the advanced volume reduction facilities for LLW at JAEA

    International Nuclear Information System (INIS)

    Nakashio, Nobuyuki; Higuchi, Hidekazu; Momma, Toshiyuki; Kozawa, Kazushige; Touhei, Toshio; Sudou, Tomoyuki; Mitsuda, Motoyuki; Kurosawa, Shigenobu; Hemmi, Kou; Ishikawa, Joji; Kato, Mitsugu; Sato, Motoaki

    2007-01-01

    The Japan Atomic Energy Agency (JAEA) constructed the Advanced Volume Reduction Facilities (AVRF), in which volume reduction techniques are applied and achieved high volume reduction ratio, homogenization and stabilization by means of melting or super compaction processes for low level radioactive solid wastes. It will be able to produce waste packages for final disposal and to reduce the volume of stored wastes by operating the AVRF. The AVRF consist of the Waste Size Reduction and Storage Facilities (WSRSF) and the Waste Volume Reduction Facilities (WVRF); the former has cutting installations for large size wastes and the latter has melting units and a super compactor. Cutting installations in the WSRSF have been operating since July 1999. Radioactive wastes treated so far amount to 750 m 3 and the volume reduction ratio is from 1.7 to 3.7. The WVRF has been operating with non-radioactive wastes since February 2003 for the training and the homogeneity investigation in the melting processes. The operation of the pretreatment system in the WVRF with radioactive wastes has partly started in FY2005. (author)

  6. Small Aircraft Transportation System Higher Volume Operations Concept

    Science.gov (United States)

    Abbott, Terence S.; Consiglio, Maria C.; Baxley, Brian T.; Williams, Daniel M.; Jones, Kenneth M.; Adams, Catherine A.

    2006-01-01

    This document defines the Small Aircraft Transportation System (SATS) Higher Volume Operations concept. The general philosophy underlying this concept is the establishment of a newly defined area of flight operations called a Self-Controlled Area (SCA). Within the SCA, pilots would take responsibility for separation assurance between their aircraft and other similarly equipped aircraft. This document also provides details for a number of off-nominal and emergency procedures which address situations that could be expected to occur in a future SCA. The details for this operational concept along with a description of candidate aircraft systems to support this concept are provided.

  7. Remedial Investigation Report on Chestnut Ridge Operable Unit 2 (Filled Coal Ash Pond/Upper McCoy Branch) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Volume 1. Main Text

    International Nuclear Information System (INIS)

    1994-08-01

    This document is a report on the remedial investigation (RI) of Chestnut Ridge Operable Unit (OU) 2 at the Oak Ridge Y-12 Plant. Chestnut Ridge OU 2 consists of Upper McCoy Branch (UMB), the Filled Coal Ash Pond (FCAP), and the area surrounding the Sluice Channel formerly associated with coal ash disposal in the FCAP. Chestnut Ridge OU 2 is located within the U.S. Department of Energy's (DOE's) Oak Ridge Reservation in Anderson County, Tennessee, approximately 24 miles west of Knoxville. The pond is an 8.5-acre area on the southern slope of Chestnut Ridge, 0.5 mile south of the main Y-12 Plant and geographically separated from the Y-12 Plant by Chestnut Ridge. The elevation of the FCAP is ∼ 950 ft above mean sea level (msl), and it is relatively flat and largely vegetated. Two small ponds are usually present at the northeast and northwest comers of the FCAP. The Sluice Channel Area extends ∼1000 ft from the northern margin of the FCAP to the crest of Chestnut Ridge, which has an elevation of ∼1100 ft above msl. The Sluice Channel Area is largely vegetated also. McCoy Branch runs from the top of Chestnut Ridge across the FCAP into Rogers Quarry and out of the quarry where it runs a short distance into Milton Hill Lake at McCoy Embayment, termed UMB. The portion south of Rogers Quarry, within Chestnut Ridge OU 4, is termed Lower McCoy Branch. The DOE Oak Ridge Y-12 Plant disposed of coal ash from its steam plant operations as a slurry that was discharged into an ash retention impoundment; this impoundment is the FCAP. The FCAP was built in 1955 to serve as a settling basin after coal ash slurried over Chestnut Ridge from the Y-12 Plant. The FCAP was constructed by building an earthen dam across the northern tributary of McCoy Branch. The dam was designed to hold 20 years of Y-12 steam plant ash. By July 1967, ash had filled up the impoundment storage behind the dam to within 4 ft of the top

  8. Remedial Investigation Report on Chestnut Ridge Operable Unit 2 (Filled Coal Ash Pond/Upper McCoy Branch) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Volume 1. Main Text

    Energy Technology Data Exchange (ETDEWEB)

    1994-08-01

    This document is a report on the remedial investigation (RI) of Chestnut Ridge Operable Unit (OU) 2 at the Oak Ridge Y-12 Plant. Chestnut Ridge OU 2 consists of Upper McCoy Branch (UMB), the Filled Coal Ash Pond (FCAP), and the area surrounding the Sluice Channel formerly associated with coal ash disposal in the FCAP. Chestnut Ridge OU 2 is located within the U.S. Department of Energy`s (DOE`s) Oak Ridge Reservation in Anderson County, Tennessee, approximately 24 miles west of Knoxville. The pond is an 8.5-acre area on the southern slope of Chestnut Ridge, 0.5 mile south of the main Y-12 Plant and geographically separated from the Y-12 Plant by Chestnut Ridge. The elevation of the FCAP is {approximately} 950 ft above mean sea level (msl), and it is relatively flat and largely vegetated. Two small ponds are usually present at the northeast and northwest comers of the FCAP. The Sluice Channel Area extends {approximately}1000 ft from the northern margin of the FCAP to the crest of Chestnut Ridge, which has an elevation of {approximately}1100 ft above msl. The Sluice Channel Area is largely vegetated also. McCoy Branch runs from the top of Chestnut Ridge across the FCAP into Rogers Quarry and out of the quarry where it runs a short distance into Milton Hill Lake at McCoy Embayment, termed UMB. The portion south of Rogers Quarry, within Chestnut Ridge OU 4, is termed Lower McCoy Branch. The DOE Oak Ridge Y-12 Plant disposed of coal ash from its steam plant operations as a slurry that was discharged into an ash retention impoundment; this impoundment is the FCAP. The FCAP was built in 1955 to serve as a settling basin after coal ash slurried over Chestnut Ridge from the Y-12 Plant. The FCAP was constructed by building an earthen dam across the northern tributary of McCoy Branch. The dam was designed to hold 20 years of Y-12 steam plant ash. By July 1967, ash had filled up the impoundment storage behind the dam to within 4 ft of the top.

  9. 2014 Highlights of Ferry Operations in the United States

    Science.gov (United States)

    2016-05-01

    Based on information provided by operators who responded to the 2014 National Census of Ferry Operators (NCFO), the Bureau of Transportation Statistics (BTS) conservatively estimates that ferries in the United States carried just over 115 million pas...

  10. Hanford tank waste operation simulator operational waste volume projection verification and validation procedure

    International Nuclear Information System (INIS)

    HARMSEN, R.W.

    1999-01-01

    The Hanford Tank Waste Operation Simulator is tested to determine if it can replace the FORTRAN-based Operational Waste Volume Projection computer simulation that has traditionally served to project double-shell tank utilization. Three Test Cases are used to compare the results of the two simulators; one incorporates the cleanup schedule of the Tri Party Agreement

  11. Operation of the radioactive acid digestion test unit

    International Nuclear Information System (INIS)

    Blasewitz, A.G.; Allen, C.R.; Lerch, R.E.; Ely, P.C.; Richardson, G.L.

    1980-01-01

    The Radioactive Acid Digestion Test Unit (RADTU) has been constructed at Hanford to demonstrate the application of the Acid Digestion Process for treating combustible transuranic wastes and scrap materials. The RADTU with its original tray digestion vessel has recently completed a six-month campaign processing potentially contaminated nonglovebox wastes from a Hanford plutonium facility. During this campaign, it processed 2100 kg of largely cellulosic wastes at an average sustained processing rate of 3 kg/h as limited by the water boiloff rate from the acid feeds. The on-line operating efficiency was nearly 50% on a twelve hour/day, five day/week basis. Following this campaign, a new annular high rate digester has been installed for testing. In preliminary tests with simulated wastes, the new digester demonstrated a sustained capacity of 10 kg/h with greatly improved intimacy of contact between the digestion acid and the waste. The new design also doubles the heat transfer surface, which with reduced heat loss area, is expected to provide at least three times the water boiloff rate of the previous tray digester design. Following shakedown testing with simulated and low-level wastes, the new unit will be used to process combustible plutonium scrap and waste from Hanford plutonium facilities for the purposes of volume reduction, plutonium recovery, and stabilization of the final waste form

  12. Evaluation of potential severe accidents during low power and shutdown operations at Grand Gulf, Unit 1. Volume 2, Part 1C: Analysis of core damage frequency from internal events for plant operational State 5 during a refueling outage, Main report (Sections 11--14)

    International Nuclear Information System (INIS)

    Whitehead, D.; Darby, J.; Yakle, J.

    1994-06-01

    This document contains the accident sequence analysis of internally initiated events for Grand Gulf, Unit 1 as it operates in the Low Power and Shutdown Plant Operational State 5 during a refueling outage. The report documents the methodology used during the analysis, describes the results from the application of the methodology, and compares the results with the results from two full power analyses performed on Grand Gulf

  13. Evaluation of potential severe accidents during low power and shutdown operations at Grand Gulf, Unit 1: Analysis of core damage frequency from internal events for Plant Operational State 5 during a refueling outage. Volume 2, Part 2: Internal Events Appendices A to H

    International Nuclear Information System (INIS)

    Darby, J.; Whitehead, D.; Staple, B.; Dandini, V.

    1994-06-01

    This document contains the accident sequence analysis of internally initiated events for Grand Gulf, Unit 1 as it operates in the Low Power and Shutdown Plant Operational State 5 during a refueling outage. The report documents the methodology used during the analysis, describes the results from the application of the methodology, and compares the results with the results from two full power analyses performed on Grand Gulf

  14. User's operating procedures. Volume 3: Projects directorate information programs

    Science.gov (United States)

    Haris, C. G.; Harris, D. K.

    1985-01-01

    A review of the user's operating procedures for the scout project automatic data system, called SPADS is presented. SPADS is the results of the past seven years of software development on a prime mini-computer. SPADS was developed as a single entry, multiple cross-reference data management and information retrieval system for the automation of Project office tasks, including engineering, financial, managerial, and clerical support. This volume, three of three, provides the instructions to operate the projects directorate information programs in data retrieval and file maintenance via the user friendly menu drivers.

  15. User's operating procedures. Volume 2: Scout project financial analysis program

    Science.gov (United States)

    Harris, C. G.; Haris, D. K.

    1985-01-01

    A review is presented of the user's operating procedures for the Scout Project Automatic Data system, called SPADS. SPADS is the result of the past seven years of software development on a Prime mini-computer located at the Scout Project Office, NASA Langley Research Center, Hampton, Virginia. SPADS was developed as a single entry, multiple cross-reference data management and information retrieval system for the automation of Project office tasks, including engineering, financial, managerial, and clerical support. This volume, two (2) of three (3), provides the instructions to operate the Scout Project Financial Analysis program in data retrieval and file maintenance via the user friendly menu drivers.

  16. Analysis of Serbian Military Riverine Units Capability for Participation in the United Nations Peacekeeping Operations

    Directory of Open Access Journals (Sweden)

    Slobodan Radojevic

    2017-06-01

    Full Text Available This paper analyses required personnel, training capacities and equipment for participation in the United Nations peacekeeping operations with the riverine elements. In order to meet necessary capabilities for engagement in United Nations peacekeeping operations, Serbian military riverine units have to be compatible with the issued UN requirements. Serbian Armed Forces have the potential to reach such requirements with the River Flotilla as a pivot for the participation in UN missions. Serbian Military Academy adopted and developed educational and training program in accordance with the provisions and recommendations of the IMO conventions and IMO model courses. Serbian Military Academy has opportunities for education and training military riverine units for participation in the United Nations peacekeeping operations. Moreover, Serbia has Multinational Operations Training Center and Peacekeeping Operations Center certified to provide selection, training, equipping and preparations of individuals and units to the United Nations multinational operations.

  17. Laboratory Evaluation of In Situ Chemical Oxidation for Groundwater Remediation, Test Area North, Operable Unit 1-07B, Idaho National Engineering and Environmental Laboratory, Volume Three - Appendix F

    Energy Technology Data Exchange (ETDEWEB)

    Cline, S.R.; Denton, D.L.; Giaquinto, J.M.; McCracken, M.K.; Starr, R.C.

    1999-04-01

    This appendix supports the results and discussion of the laboratory work performed to evaluate the feasibility of in situ chemical oxidation for Idaho National Environmental and Engineering Laboratory's (INEEL) Test Area North (TAN) which is contained in ORNL/TM-13711/V1. This volume contains Appendix F. Appendix F is essentially a photocopy of the ORNL researchers' laboratory notebooks from the Environmental Sciences Division (ESD) and the Radioactive Materials Analytical Laboratory (RMAL).

  18. UNITED STATES SPECIAL OPERATIONS FORCES IN AFRICA

    Science.gov (United States)

    2016-02-16

    hundreds of traditional African religions associated with the plethora of tribal groups as well as large populations of Muslims, primarily in the...engagement, and the complexities of the African continent, Special Operations Forces (SOF) are uniquely suited to further those interests. Additionally...protecting access to abundant strategic resources, fostering integration into the global economy, and empowering Africans and their partners to deal

  19. Recycle operations as a methodology for radioactive waste volume reduction

    International Nuclear Information System (INIS)

    Rasmussen, G.A.

    1985-01-01

    The costs for packaging, transportation and burial of low-level radioactive metallic waste have become so expensive that an alternate method of decontamination for volume reduction prior to disposal can now be justified. The operation of a large-scale centralized recycle center for decontamination of selected low level radioactive waste has been proven to be an effective method for waste volume reduction and for retrieving valuable materials for unlimited use. The centralized recycle center concept allows application of state-of-the-art decontamination technology resulting in a reduction in utility disposal costs and a reduction in overall net amount of material being buried. Examples of specific decontamination process activities at the centralized facility will be reviewed along with a discussion of the economic impact of decontamination for recycling and volume reduction. Based on almost two years of operation of a centralized decontamination facility, a demonstrated capability exists. The concept has been cost effective and proves that valuable resources can be recycled

  20. Operational experience in the United Kingdom

    International Nuclear Information System (INIS)

    Gronow, W.S.

    1977-01-01

    In the UK there are 26 Magnox reactors and 4 AGRs operating on 11 licensed sites; a further 6 AGRs are under construction on 2 additional and one of the existing sites. The arrangements by which the Nuclear Installations Inspectorate, on behalf of the Health and Safety Executive, carries out its regulatory functions at operating nuclear power plants are described. The range of activities undertaken is described with special reference being made to the biennial shutdowns for approved maintenance and inspections which are required by conditions attached to the site licence. The other means by which the continuing safety of these power reactors is assured are explained and include the relationship with the licensee's own Nuclear Safety Committee, approved arrangements for modifications to plant systems or components which have importance for safety and long term reviews of safety aspects. (author)

  1. Unit costs of waste management operations

    International Nuclear Information System (INIS)

    Kisieleski, W.E.; Folga, S.M.; Gillette, J.L.; Buehring, W.A.

    1994-04-01

    This report provides estimates of generic costs for the management, disposal, and surveillance of various waste types, from the time they are generated to the end of their institutional control. Costs include monitoring and surveillance costs required after waste disposal. Available data on costs for the treatment, storage, disposal, and transportation of spent nuclear fuel and high-level radioactive, low-level radioactive, transuranic radioactive, hazardous, mixed (low-level radioactive plus hazardous), and sanitary wastes are presented. The costs cover all major elements that contribute to the total system life-cycle (i.e., ''cradle to grave'') cost for each waste type. This total cost is the sum of fixed and variable cost components. Variable costs are affected by operating rates and throughput capacities and vary in direct proportion to changes in the level of activity. Fixed costs remain constant regardless of changes in the amount of waste, operating rates, or throughput capacities. Key factors that influence cost, such as the size and throughput capacity of facilities, are identified. In many cases, ranges of values for the key variables are presented. For some waste types, the planned or estimated costs for storage and disposal, projected to the year 2000, are presented as graphics

  2. Fast reactor operation in the United States

    International Nuclear Information System (INIS)

    Smith, R.R.; Cissel, D.W.

    1978-01-01

    Of the many American facilities dedicated to fast reactor technology, six qualify as liquid-metal-cooled fast reactors. All of these satisfy the following criteria: an unmoderated neutron spectrum, highly enriched fuel material, substantial heat production, and the use of a liquid metal coolant. These include the following: EBR-I Clementine, LAMPRE, EBR-II, EFFBR, and SEFOR. Collectively, these facilities encompassed all of the more important features of liquid-metal-cooled fast reactor technology. Coolant types ranged from mercury in Clementine, to NaK in EBR-I, and sodium in the others. Fuels included enriched-uranium metallic alloys in EBR-I, EBR-II, and EFFBR; metallic plutonium in Clementine; molten plutonium alloy in LAMPRE; and a mixed UO 2 -PuO 2 ceramic in SEFOR. Heat removal techniques ranged from air-blast cooling in LAMPRE and SEFOR; steam-electrical generation in EBR-I, EBR-II, and EFFBR; to a mercury-to-water heat dump in Clementine. Operational experience with such diverse systems has contributed heavily to the U.S. Each of the six systems is described from the viewpoints of purpose, history, design, and operation. Attempts are made to limit descriptive material to the most important features and to refer the reader to a few select references if additional information is needed

  3. Clinical target volume delineation in glioblastomas: pre-operative versus post-operative/pre-radiotherapy MRI

    Science.gov (United States)

    Farace, P; Giri, M G; Meliadò, G; Amelio, D; Widesott, L; Ricciardi, G K; Dall'Oglio, S; Rizzotti, A; Sbarbati, A; Beltramello, A; Maluta, S; Amichetti, M

    2011-01-01

    Objectives Delineation of clinical target volume (CTV) is still controversial in glioblastomas. In order to assess the differences in volume and shape of the radiotherapy target, the use of pre-operative vs post-operative/pre-radiotherapy T1 and T2 weighted MRI was compared. Methods 4 CTVs were delineated in 24 patients pre-operatively and post-operatively using T1 contrast-enhanced (T1PRECTV and T1POSTCTV) and T2 weighted images (T2PRECTV and T2POSTCTV). Pre-operative MRI examinations were performed the day before surgery, whereas post-operative examinations were acquired 1 month after surgery and before chemoradiation. A concordance index (CI) was defined as the ratio between the overlapping and composite volumes. Results The volumes of T1PRECTV and T1POSTCTV were not statistically different (248 ± 88 vs 254 ± 101), although volume differences >100 cm3 were observed in 6 out of 24 patients. A marked increase due to tumour progression was shown in three patients. Three patients showed a decrease because of a reduced mass effect. A significant reduction occurred between pre-operative and post-operative T2 volumes (139 ± 68 vs 78 ± 59). Lack of concordance was observed between T1PRECTV and T1POSTCTV (CI = 0.67 ± 0.09), T2PRECTV and T2POSTCTV (CI = 0.39 ± 0.20) and comparing the portion of the T1PRECTV and T1POSTCTV not covered by that defined on T2PRECTV images (CI = 0.45 ± 0.16 and 0.44 ± 0.17, respectively). Conclusion Using T2 MRI, huge variations can be observed in peritumoural oedema, which are probably due to steroid treatment. Using T1 MRI, brain shifts after surgery and possible progressive enhancing lesions produce substantial differences in CTVs. Our data support the use of post-operative/pre-radiotherapy T1 weighted MRI for planning purposes. PMID:21045069

  4. Laboratory Evaluation of In Situ Chemical Oxidation for Groundwater Remediation, Test Area North, Operable Unit 1-07B, Idaho National Engineering and Environmental Laboratory, Volume Two, Appendices C, D, and E

    Energy Technology Data Exchange (ETDEWEB)

    Cline, S.R.; Denton, D.L.; Giaquinto, J.M.; McCracken, M.K.; Starr, R.C.

    1999-04-01

    These appendices support the results and discussion of the laboratory work performed to evaluate the feasibility of in situ chemical oxidation for Idaho National Environmental and Engineering Laboratory's (INEEL) Test Area North (TAN) which is contained in ORNL/TM-1371 l/Vol. This volume contains Appendices C-E. Appendix C is a compilation of all recorded data and mathematical calculations made to interpret the data. For the Task 3 and Task 4 work, the spreadsheet column definitions are included immediately before the actual spreadsheet pages and are listed as ''Sample Calculations/Column Definitions'' in the table of contents. Appendix D includes the chronological order in which the experiments were conducted and the final project costs through October 1998. Appendix E is a compilation of the monthly progress reports submitted to INEEL during the course of the project.

  5. Aquifer test plan for the 100-HR-3 Operable Unit

    International Nuclear Information System (INIS)

    Swanson, L.C.; Hartman, M.J.

    1994-01-01

    This test plan directs hydrologic testing activities planned at three existing Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) wells in the 100-HR-3 Operable Unit of the Hanford Site. Three additional wells will be installed near these existing wells and used as additional testing arid observation points during the field activities. Figure 1 shows the locations of the three test sites. A primary objective of the testing program is to provide more detailed hydraulic characterization information for the unconfined aquifer and targeted test sites than provided by the initial reconnaissance-level slug testing of Vukelich. A second objective is to evaluate the applicability of slug interference and dipole flow tests for detailed hydraulic characterization in an unconfined aquifer. This aquifer testing program will also be useful for substantiating hydraulic conductivities reported from previous slug tests and evaluating the effects of filter pack volume/configuration on slug test data. Vukelich recommended additional testing to address the latter two issues

  6. Analysis of operating reliability of WWER-1000 unit

    International Nuclear Information System (INIS)

    Bortlik, J.

    1985-01-01

    The nuclear power unit was divided into 33 technological units. Input data for reliability analysis were surveys of operating results obtained from the IAEA information system and certain indexes of the reliability of technological equipment determined using the Bayes formula. The missing reliability data for technological equipment were used from the basic variant. The fault tree of the WWER-1000 unit was determined for the peak event defined as the impossibility of reaching 100%, 75% and 50% of rated power. The period was observed of the nuclear power plant operation with reduced output owing to defect and the respective time needed for a repair of the equipment. The calculation of the availability of the WWER-1000 unit was made for different variant situations. Certain indexes of the operating reliability of the WWER-1000 unit which are the result of a detailed reliability analysis are tabulated for selected variants. (E.S.)

  7. An Appraisal Of The Operation And Management Of Unit Trust ...

    African Journals Online (AJOL)

    An Appraisal Of The Operation And Management Of Unit Trust Schemes In Nigeria. ... Open Access DOWNLOAD FULL TEXT ... instead of being invested in shares or in money market instruments as a result of widespread financial illiteracy.

  8. Operative volume and outcomes of cerebrovascular neurosurgery in children.

    Science.gov (United States)

    Bekelis, Kimon; Connolly, Ian D; Do, Huy M; Choudhri, Omar

    2016-11-01

    OBJECTIVE The impact of procedural volume on the outcomes of cerebrovascular surgery in children has not been determined. In this study, the authors investigated the association of operative volume on the outcomes of cerebrovascular neurosurgery in pediatric patients. METHODS The authors performed a cohort study of all pediatric patients who underwent a cerebrovascular procedure between 2003 and 2012 and were registered in the Kids' Inpatient Database (KID). To control for confounding, the authors used multivariable regression models, propensity-score conditioning, and mixed-effects analysis to account for clustering at the hospital level. RESULTS During the study period, 1875 pediatric patients in the KID underwent cerebrovascular neurosurgery and met the inclusion criteria for the study; 204 patients (10.9%) underwent aneurysm clipping, 446 (23.8%) underwent coil insertion for an aneurysm, 827 (44.1%) underwent craniotomy for arteriovenous malformation resection, and 398 (21.2%) underwent bypass surgery for moyamoya disease. Mixed-effects multivariable regression analysis revealed that higher procedural volume was associated with fewer inpatient deaths (OR 0.58; 95% CI 0.40-0.85), a lower rate of discharges to a facility (OR 0.87; 95% CI 0.82-0.92), and shorter length of stay (adjusted difference -0.22; 95% CI -0.32 to -0.12). The results in propensity-adjusted multivariable models were robust. CONCLUSIONS In a national all-payer cohort of pediatric patients who underwent a cerebrovascular procedure, the authors found that higher procedural volume was associated with fewer deaths, a lower rate of discharges to a facility, and decreased lengths of stay. Regionalization initiatives should include directing children with such rare pathologies to a center of excellence.

  9. Initial startup and operations of Yonggwang Units 3 and 4

    International Nuclear Information System (INIS)

    Collier, T.J.; Chari, D.R.; Kiraly, F.

    1996-01-01

    A significant milestone in the nuclear power industry was achieved in 1995, when Yonggwang (YGN) Units 3 and 4 were accepted into in commercial operation by Korea Electric Power Corporation (KEPCO). YGN Unit 3 was accepted into commercial operation on March 31, 1995, the original date established during project initiation. YGN Unit 4 was accepted into operation on January 1, 1996, 3 months ahead of schedule. Each YGN unit produces approximately 1,050 Mwe and supplies approximately ten percent of the total electric power demand in the Republic of Korea (ROK). The overall plant efficiency is approximately 37% which is at least 1% higher than most nuclear units. Since achieving commercial operation, YGN Unit 3 has operated at essentially full power which has resulted in an annual performance rate in excess of 85%. YGN Unit 3 is the first of six pressurized water reactors which are currently under design and construction in the ROK and serves as the reference design for the Korean Standard Nuclear Power Plant program. Both YGN Units 3 and 4 include a System 800 Nuclear Steam Supply System (NSSS). The NSSS is rated at 2,815 Mwth and is the ABB-CE standard design. The design includes numerous advanced design features which enhance plant safety, performance and operability. A well executed startup test program was successfully completed on both units prior to commercial operation. A summary of the YGN NSSS design features, the startup test program and selected test results demonstrating the performance of those features are presented in this paper

  10. Stability Analysis for Operation of DG Units in Smart Grids

    DEFF Research Database (Denmark)

    Pouresmaeil, Edris; Shaker, Hamid Reza; Mehrasa, Majid

    2015-01-01

    This paper presents a multifunction control strategy for the stable operation of Distributed Generation (DG) units during grid integration. The proposed control model is based on Direct Lyapunov Control (DLC) theory and provides a stable region for the appropriate operation of DG units during grid....... Application of this concept can guarantee to reduce the stress on the grid during the energy demand peak. Simulation results are presented to demonstrate the proficiency and performance of the proposed DLC technique in DG technology....

  11. Eielson Air Force Base Operable Unit 2 baseline risk assessment

    Energy Technology Data Exchange (ETDEWEB)

    Lewis, R.E.; Jarvis, T.T.; Jarvis, M.R.; Whelan, G.

    1994-10-01

    Operable Unit 2 at Eielson Air Force Base (AFB) near Fairbanks, is one of several operable units characterized by petroleum, oil, and lubricant contamination, and by the presence of organic products floating at the water table, as a result of Air Force operations since the 1940s. The base is approximately 19,270 acres in size, and comprises the areas for military operations and a residential neighborhood for military dependents. Within Operable Unit 2, there are seven source areas. These source areas were grouped together primarily because of the contaminants released and hence are not necessarily in geographical proximity. Source area ST10 includes a surface water body (Hardfill Lake) next to a fuel spill area. The primary constituents of concern for human health include benzene, toluene, ethylbenzene, and xylenes (BTEX). Monitored data showed these volatile constituents to be present in groundwater wells. The data also showed an elevated level of trace metals in groundwater.

  12. Feasibility study report for the 200-BP-1 operable unit

    International Nuclear Information System (INIS)

    1993-06-01

    This feasibility study examines a range of alternatives and provides recommendations for selecting a preferred alternative for remediating contamination at the 200-BP-1 operable unit. The 200-BP-1 operable unit is located in the center of the Hanford Site along the northern boundary of the 200 East Area. The 241-BY Tank Farm is located immediately to the south of the operable unit. 200-BP-1 is a source operable unit with contaminated soils associated primarily with nine inactive cribs (known as the 216-B cribs). These cribs were used for disposal of low-level radioactive liquid waste from U Plant uranium recovery operations, and waste storage tank condensate from the adjacent 241-BY Tank Farm. The cribs used for disposal of U Plant waste were in operation from 1955--1965, and the cribs used for disposal of tank condensate were in operation from 1965--1975. In addition to the cribs, four unplanned releases of radioactive materials have occurred within the operable unit. Contaminated surface soils associated with the unplanned releases have been consolidated over the cribs and covered with clean soil to reduce contaminant migration and exposure. Discharge of wastes to the cribs has resulted in soil and groundwater contamination. The groundwater is being addressed as part of the 200 East Aggregate Area, groundwater operable unit. Contaminated soils at the site can be categorized by the types of contaminants, their distribution in the soil column, and the risk posed by the various potential exposure pathways. Below the clean soil cover, the near surface soils contain low-levels of contamination with cesium-137, radium-226, strontium-90, thorium-228, and uranium. The lifetime incremental cancer risk associated with these soils if they were exposed at the surface is 9x10 -5

  13. Feasibility study report for the 200-BP-1 operable unit

    International Nuclear Information System (INIS)

    1994-01-01

    This feasibility study (FS) examines a range of alternatives and provides recommendations for selecting a preferred altemative for remediating contamination at the 200-BP-1 operable unit. The 200-BP-1 operable unit is located in the center of the Hanford Site along the northern boundary of the 200 East Area. The 241-BY Tank Farm is located immediately to the south of the operable unit. 200-BP-1 is a source operable unit with contaminated soils associated primarily with nine inactive cribs (known as the 216-B cribs). These cribs were used for disposal of low-level radioactive liquid waste from U Plant uranium recovery operations, and waste storage tank condensate from the adjacent 241-BY Tank Farm. The cribs used for disposal of U Plant waste were in operation from 1955--1965, and the cribs used for disposal of tank condensate were in operation from 1965-1975. In addition to the cribs, four unplanned releases of radioactive materials have occurred within the operable unit. Contaminated surface soils associated with the unplanned releases have been consolidated over the cribs and covered with clean soil to reduce contaminant migration and exposure. Discharge of wastes to the cribs has resulted in soil and groundwater contamination. The groundwater is being addressed as part of the 200 East Aggregate Area groundwater operable unit. Contaminated soils at the site can be categorized by the types of contaminants, their distribution in the soil column, and the risk posed by the various potential exposure pathways. Below the clean soil cover, the near surface soils contain low-:levels of contamination with cesium-137, radium-226, strontium-90, thorium-228 and uranium. The lifetime incremental cancer risk associated with these soils if they were exposed at the surface is 9 x 10 5

  14. Feasibility study report for the 200-BP-1 operable unit

    Energy Technology Data Exchange (ETDEWEB)

    1993-06-01

    This feasibility study examines a range of alternatives and provides recommendations for selecting a preferred alternative for remediating contamination at the 200-BP-1 operable unit. The 200-BP-1 operable unit is located in the center of the Hanford Site along the northern boundary of the 200 East Area. The 241-BY Tank Farm is located immediately to the south of the operable unit. 200-BP-1 is a source operable unit with contaminated soils associated primarily with nine inactive cribs (known as the 216-B cribs). These cribs were used for disposal of low-level radioactive liquid waste from U Plant uranium recovery operations, and waste storage tank condensate from the adjacent 241-BY Tank Farm. The cribs used for disposal of U Plant waste were in operation from 1955--1965, and the cribs used for disposal of tank condensate were in operation from 1965--1975. In addition to the cribs, four unplanned releases of radioactive materials have occurred within the operable unit. Contaminated surface soils associated with the unplanned releases have been consolidated over the cribs and covered with clean soil to reduce contaminant migration and exposure. Discharge of wastes to the cribs has resulted in soil and groundwater contamination. The groundwater is being addressed as part of the 200 East Aggregate Area, groundwater operable unit. Contaminated soils at the site can be categorized by the types of contaminants, their distribution in the soil column, and the risk posed by the various potential exposure pathways. Below the clean soil cover, the near surface soils contain low-levels of contamination with cesium-137, radium-226, strontium-90, thorium-228, and uranium. The lifetime incremental cancer risk associated with these soils if they were exposed at the surface is 9{times}10{sup {minus}5}.

  15. Integrated Ground Operations Demonstration Units Testing Plans and Status

    Science.gov (United States)

    Johnson, Robert G.; Notardonato, William U.; Currin, Kelly M.; Orozco-Smith, Evelyn M.

    2012-01-01

    Cryogenic propellant loading operations with their associated flight and ground systems are some of the most complex, critical activities in launch operations. Consequently, these systems and operations account for a sizeable portion of the life cycle costs of any launch program. NASA operations for handling cryogens in ground support equipment have not changed substantially in 50 years, despite advances in cryogenics, system health management and command and control technologies. This project was developed to mature, integrate and demonstrate advancement in the current state of the art in these areas using two distinct integrated ground operations demonstration units (GODU): GODU Integrated Refrigeration and Storage (IRAS) and GODU Autonomous Control

  16. 200-UP-2 Operable Unit technical baseline report

    International Nuclear Information System (INIS)

    Deford, D.H.

    1991-02-01

    This report is prepared in support of the development of a Remedial Investigation/Feasibility Study (RI/FS) Work Plan for the 200-UP-2 Operable Unit by EBASCO Environmental, Incorporated. It provides a technical baseline of the 200-UP-2 Operable Unit and results from an environmental investigation undertaken by the Technical Baseline Section of the Environmental Engineering Group, Westinghouse Hanford Company (Westinghouse Hanford). The 200-UP-2 Operable Unit Technical Baseline Report is based on review and evaluation of numerous Hanford Site current and historical reports, Hanford Site drawings and photographs and is supplemented with Hanford Site inspections and employee interviews. No field investigations or sampling were conducted. Each waste site in the 200-UP-2 Operable Unit is described separately. Close relationships between waste units, such as overflow from one to another, are also discussed. The 200-UP-2 Operable Unit consists of liquid-waste disposal sites in the vicinity of, and related to, U Plant operations in the 200 West Area of the Hanford Site. The ''U Plant'' refers to the 221-U Process Canyon Building, a chemical separations facility constructed during World War 2. It also includes the Uranium Oxide (UO 3 ) Plant, which was constructed at the same time and, like the 221-U Process Canyon Building, was later converted for other missions. Waste sites in the 200-UP-2 Operable Unit are associated with the U Plant Uranium Metal Recovery Program mission that occurred between 1952 and 1958 and the UO 3 Plant's ongoing uranium oxide mission and include one or more cribs, reverse wells, french drains, septic tanks and drain fields, trenches, catch tanks, settling tanks, diversion boxes, waste vaults, and the lines and encasements that connect them. 11 refs., 1 tab

  17. Operation and Maintenance Plan for the 300-FF-5 Operable Unit

    International Nuclear Information System (INIS)

    Singleton, K.M.

    1996-09-01

    This document is the operation and maintenance plan for the 300-FF-5 groundwater operable unit. The purpose of this plan is to identify tasks necessary to verify the effectiveness of the selected alternative. This plan also describes the monitoring program and administrative tasks that will be used as the preferred alternative for the remediation of groundwater in the 300-FF-5 Operable Unit. The preferred alternative selected for remediation of groundwater consists of institutional controls

  18. Transuranic (TRU) waste volume reduction operations at a plutonium facility

    International Nuclear Information System (INIS)

    Cournoyer, Michael E.; Nixon, Archie E.; Fife, Keith W.; Sandoval, Arnold M.; Garcia, Vincent E.; Dodge, Robert L.

    2011-01-01

    Programmatic operations at the Los Alamos National Laboratory Plutonium Facility (TA-55) involve working with various amounts of plutonium and other highly toxic, alpha-emitting materials. The spread of radiological contamination on surfaces, airborne contamination, and excursions of contaminants into the operator's breathing zone are prevented through use of a variety of gloveboxes (the glovebox, coupled with an adequate negative pressure gradient, provides primary confinement). Size-reduction operations on glovebox equipment are a common activity when a process has been discontinued and the room is being modified to support a new customer. The Actinide Processing Group at TA-55 uses one-meter or longer glass columns to process plutonium. Disposal of used columns is a challenge, since they must be size-reduced to get them out of the glovebox. The task is a high-risk operation because the glass shards that are generated can puncture the bag-out bags, leather protectors, glovebox gloves, and the worker's skin when completing the task. One of the Lessons Learned from these operations is that Laboratory management should critically evaluate each hazard and provide more effective measures to prevent personnel injury. A bag made of puncture-resistant material was one of these enhanced controls. We have investigated the effectiveness of these bags and have found that they safely and effectively permit glass objects to be reduced to small pieces with a plastic or rubber mallet; the waste can then be easily poured into a container for removal from the glovebox as non-compactable transuranic (TRU) waste. This size-reduction operation reduces solid TRU waste volume generation by almost 2½ times. Replacing one-time-use bag-out bags with multiple-use glass crushing bags also contributes to reducing generated waste. In addition, significant costs from contamination, cleanup, and preparation of incident documentation are avoided. This effort contributes to the Los Alamos

  19. Basewide Groundwater Operable Unit. Groundwater Operable Unit Remedial Investigation/Feasibility Study Report. Volume 3

    Science.gov (United States)

    1994-06-01

    chemicals from offgas streams, such as gases from municipal wastewater treatment plants. Recently, biofiltration has been employed to treat VOCs in...L 6-12 W orks Cited ....................................... L6-12 L7 Cometabolic Biofiltration Implementation Plan .................... L7...by eliminating outlying values that dispro- portionately skewed the results. The average composite scores were plotted (Figures Li-1 through LU-5), and

  20. Analysis on Isolation Condenser Operation by Fukushima Daiichi Unit 1 Operators

    International Nuclear Information System (INIS)

    Kim, Man Cheol

    2014-01-01

    Fukushima Daiichi nuclear accident resulted in the core damage in three reactors and the release of considerable amount of radioactive material to the environment, not to mention significant social impact and anti-nuclear atmosphere all around the world. This paper provides a review of the findings related to shift operators' operation of the isolation condenser in Unit 1 to examine shift operators' response to the situation. Based on the review of the findings, a situation assessment model was developed to analyze shift operators' understanding on whether core cooling was successfully performed in Unit 1 through the operation of isolation condenser. It was found that lack of information could be one of the main causes for the failure in core cooling by the IC in Unit 1. It is also recommended that the differences in the mathematical model for the situation assessment and that of the real operator need to be further investigated

  1. Analysis on Isolation Condenser Operation by Fukushima Daiichi Unit 1 Operators

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Man Cheol [Chungang University, Seoul (Korea, Republic of)

    2014-08-15

    Fukushima Daiichi nuclear accident resulted in the core damage in three reactors and the release of considerable amount of radioactive material to the environment, not to mention significant social impact and anti-nuclear atmosphere all around the world. This paper provides a review of the findings related to shift operators' operation of the isolation condenser in Unit 1 to examine shift operators' response to the situation. Based on the review of the findings, a situation assessment model was developed to analyze shift operators' understanding on whether core cooling was successfully performed in Unit 1 through the operation of isolation condenser. It was found that lack of information could be one of the main causes for the failure in core cooling by the IC in Unit 1. It is also recommended that the differences in the mathematical model for the situation assessment and that of the real operator need to be further investigated.

  2. Operational behaviour of WWER nuclear power units after Chernobyl accident

    International Nuclear Information System (INIS)

    Milivojevic, S.; Spasojevic, D.

    2000-01-01

    The indicators of effectiveness of WWER operation, in 1987-1998 were analyzed. For three groups of nuclear units (WWER, NPP Kozloduy, NPP Paks), the trends of Indicators flow were established. The comparative analysis of forced outage rate, and load factor of WWERs and nuclear units all in the world was carried out; it gives the general picture of accident influence on the states and the relations of these indicators in considered period (author)

  3. On Point: The United States Army in Operation Iraqi Freedom

    Science.gov (United States)

    2004-01-01

    to retain operational context. Moreover, times noted in the text have been adjusted from Greenwich Mean Time (“ Zulu ”) to local Kuwait time (+ 3...TF 1-64 AR unit history is composed of short narratives for each subordinate unit. Most cite times in zulu . 34. Ibid. 35. Ibid. Numbers of enemy...places in the world. Inside the city cemetery is the Tomb of Ali, son-in-law and cousin to Mohammed and founder of the Shiite sect. Coalition leaders

  4. Small Aircraft Transportation System, Higher Volume Operations Concept: Off-Nominal Operations

    Science.gov (United States)

    Abbott, Terence S.; Consiglio, Maria C.; Baxley, Brian T.; Williams, Daniel M.; Conway, Sheila R.

    2005-01-01

    This document expands the Small Aircraft Transportation System, (SATS) Higher Volume Operations (HVO) concept to include off-nominal conditions. The general philosophy underlying the HVO concept is the establishment of a newly defined area of flight operations called a Self-Controlled Area (SCA). During periods of poor weather, a block of airspace would be established around designated non-towered, non-radar airports. Aircraft flying enroute to a SATS airport would be on a standard instrument flight rules flight clearance with Air Traffic Control providing separation services. Within the SCA, pilots would take responsibility for separation assurance between their aircraft and other similarly equipped aircraft. Previous work developed the procedures for normal HVO operations. This document provides details for off-nominal and emergency procedures for situations that could be expected to occur in a future SCA.

  5. 200-BP-5 operable unit Technical Baseline report

    International Nuclear Information System (INIS)

    Jacques, I.D.; Kent, S.K.

    1991-10-01

    This report supports development of a remedial investigation/feasibility study work plan for the 200-BP-5 operable unit. The report summarizes baseline information for waste sites and unplanned release sites located in the 200-BP-5 operable unit. The sites were investigated by the Technical Baseline Section of the Environmental Engineering Group, Westinghouse Hanford Company (Westinghouse Hanford). The investigation consisted of review and evaluation of current and historical Hanford Site reports, drawings, and photographs, and was supplemented with recent inspections of the Hanford Site and employee interviews. No field investigations or sampling were conducted

  6. Implementation of Active Learning Method in Unit Operations II Subject

    OpenAIRE

    Ma'mun, Sholeh

    2018-01-01

    ABSTRACT: Active Learning Method which requires students to take an active role in the process of learning in the classroom has been applied in Department of Chemical Engineering, Faculty of Industrial Technology, Islamic University of Indonesia for Unit Operations II subject in the Even Semester of Academic Year 2015/2016. The purpose of implementation of the learning method is to assist students in achieving competencies associated with the Unit Operations II subject and to help in creating...

  7. Operational safety experience reporting in the United States

    International Nuclear Information System (INIS)

    Hartfield, R.A.

    1978-01-01

    Licensees of nuclear power plants in the United States have many reporting requirements included in their technical specifications and the code of federal regulations, title 10. The Nuclear Regulatory Commisson receives these reports and utilizes them in its regulatory program. Part of this usage includes collecting and publishing this operating experience data in various reports and storing information in various data systems. This paper will discuss the data systems and reports on operating experience published and used by the NRC. In addition, some observations on operating experience will be made. Subjects included will be the Licensee Event Report (LER) Data File, the Operating Unit Status Report (Gray Book), Radiation Exposure Reports, Effluents Reports, the Nuclear Plant Reliability Data System, Current Events, Bulletin Wrapups and Annual Summaries. Some of the uses of the reports and systems will be discussed. The Abnormal Occurence Report to the US Congress will also be described and discussed. (author)

  8. Severe and fatal obstetric injury claims in relation to labor unit volume

    DEFF Research Database (Denmark)

    Milland, Maria; Mikkelsen, Kim L; Christoffersen, Jens K

    2015-01-01

    with decreasing annual delivery volume. Face value incidence rate ratios of approved severe injuries increased with decreasing labor unit volume, but the association did not reach statistical significance. CONCLUSION: High volume labor units appear associated with fewer approved and fewer fatal injury claims...... in labor units in 1995-2012. METHODS: Exposure information regarding the annual number of deliveries per labor unit was retrieved from the Danish National Birth Register. Outcome information was retrieved from the Danish Patient Compensation Association. Exposure was categorized in delivery volume...... quintiles as annual volume per labor unit: (10-1377), (1378-2016), (2017-2801), (2802-3861), (3862-6659). MAIN OUTCOME MEASURES: Five primary measures of outcome were used. Incidence rate ratios of (A) Submitted claims, (B) Approved claims, (C) Approved severe injury claims (120% degree of disability), (D...

  9. AN OPERATIONAL MANAGEMENT MODEL FOR A COAL MINING PRODUCTION UNIT

    Directory of Open Access Journals (Sweden)

    R. Visser

    2012-01-01

    Full Text Available

    ENGLISH ABSTRACT: The coal mining industry faces increased pressure for higher quality coal at lower cost and increased volumes. To satisfy these requirements the industry needs technically skilled first line supervisors with operational management skills. Most first line supervisors possess the necessary technical, but not the required operational management skills. Various operational management philosophies, describing world-class operational management practices exist; however, it is not possible to implement these philosophies as-is in a mining environment due to the various differences between manufacturing and mining. The solution is to provide an operational management model, adapted from these philosophies, to first line supervisors in the coal mining industry.

    AFRIKAANSE OPSOMMING: Die steenkoolmynbedryf ervaar groeiende druk van die mark vir hoër gehalte steenkool, laer koste en verhoogde volumes. Om hierdie behoefte te bevredig benodig die myn tegniesgeskoolde eerstelyntoesighouers met bedryfsbestuursvaardighede. Ongelukkig beskik die meeste toesighouers wel oor die nodige tegniese kennis, maar nie die nodige bedryfsbestuursvaardighede nie. Daar bestaan verskeie bedryfsbestuursfilosofieë wat wêreldklas bedryfsbestuurspraktyke omskryf. Dit is egter nie moontlik om die filisofieë net so in die mynbedryf te implimenteer nie a.g.v. die verskille tussen vervaardiging en mynbou. Die oplossing is om ‘n bedryfsbestuurmodel wat op hierdie filosofieë geskoei is, aan eerstelyntoesighouers in die steenkoolbedryf te verskaf.

  10. Adaptation of Professional Skills in the Unit Operations Laboratory

    Science.gov (United States)

    Rende, Deniz; Rende, Sevinc; Baysal, Nihat

    2012-01-01

    We introduce the design of three consecutive unit operations laboratory (UOL) courses that retain the academic rigor of the course while incorporating skills essential for professional careers, such as ability to propose ideas, develop practical solutions, participate in teamwork, meet deadlines, establish communication between technical support…

  11. Pressure Swing Adsorption in the Unit Operations Laboratory

    Science.gov (United States)

    Ganley, Jason

    2018-01-01

    This paper describes a student laboratory in the Unit Operations Laboratory at the Colorado School of Mines: air separation by pressure swing adsorption. The flexibility of the system enables students to study the production of enriched nitrogen or oxygen streams. Automatic data acquisition permits the study of cycle steps and performance.…

  12. Evaluation of operational safety at Babcock and Wilcox Plants: Volume 2, Thermal-hydraulic results

    International Nuclear Information System (INIS)

    Wheatley, P.D.; Davis, C.B.; Callow, R.A.; Fletcher, C.D.; Dobbe, C.A.; Beelman, R.J.

    1987-11-01

    The Nuclear Regulatory Commission has initiated a research program to develop a methodology to assess the operational performance of Babcock and Wilcox plants and to apply this methodology on a trial basis. The methodology developed for analyzing Babcock and Wilcox plants integrated methods used in both thermal-hydraulics and human factors and compared results with information used in the assessment of risk. The integrated methodology involved an evaluation of a selected plant for each pressurized water reactor vendor during a limited number of transients. A plant was selected to represent each vendor, and three transients were identified for analysis. The plants were Oconee Unit 1 for Babcock and Wilcox, H.B. Robinson Unit 2 for Westinghouse, and Calvert Cliffs Unit 1 for Combustion Engineering. The three transients were a complete loss of all feedwater, a small-break loss-of-coolant accident, and a steam-generator overfill with auxiliary feedwater. Included in the integrated methodology was an assessment of the thermal-hydraulic behavior, including event timing, of the plants during the three transients. Thermal-hydraulic results are presented in this volume (Volume 2) of the report. 26 refs., 30 figs., 7 tabs

  13. Thunderstorm Algorithm for Determining Unit Commitment in Power System Operation

    Directory of Open Access Journals (Sweden)

    Arif Nur Afandi

    2016-12-01

    Full Text Available Solving the unit commitment problem is an important task in power system operation for deciding a balanced power production between various types of generating units under technical constraints and environmental limitations. This paper presents a new intelligent computation method, called the Thunderstorm Algorithm (TA, for searching the optimal solution of the integrated economic and emission dispatch (IEED problem as the operational assessment for determining unit commitment. A simulation using the IEEE-62 bus system showed that TA has smooth convergence and is applicable for solving the IEED problem. The IEED’s solution is associated with the total fuel consumption and pollutant emission. The proposed TA method seems to be a viable new approach for finding the optimal solution of the IEED problem.

  14. Optimal operation of cogeneration units. State of art and perspective

    International Nuclear Information System (INIS)

    Polimeni, S.

    2001-01-01

    Optimal operation of cogeneration plants and of power plant fueling waste products is a complex challenge as they have to fulfill, beyond the contractual obligation of electric power supply, the constraints of supplying the required thermal energy to the user (for cogeneration units) or to burn completely the by-products of the industrial complex where they are integrated. Electrical power market evolution is pushing such units to a more and more volatile operation caused by uncertain selling price levels. This work intends to pinpoint the state of art in the optimization of these units outlining the important differences among the different size and cycles. The effect of the market liberalization on the automation systems and the optimization algorithms will be discussed [it

  15. Expert system for operational personnel support during power unit operation control in regulation range

    International Nuclear Information System (INIS)

    Yanitskij, V.A.

    1992-01-01

    The problems met when developing the systems for NPP operator support in the process of power unit operation are considered. The expert system for NPP personnel intelligent support combining the properties belonging to the artificial intelligence systems including selection of the analysis method taking into account the concrete technological situation and capability of application of algothmic calculations of the equipment characteristics using the information accumulated during the system development, erection and operation is described

  16. Nuclear data standards - International Evaluation Co-operation volume 7

    International Nuclear Information System (INIS)

    Carlson, A.D.; Shibata, K.; Vonach, H.; Hambsch, F.J.; Chen, Z.; Hofmann, H.M.; Oh, S.Y.; Badikov, S.A.; Gai, E.V.; Pronyaev, V.G.; Smith, D.L.; Hale, G.M.; Kawano, T.; Larson, N.M.

    2006-01-01

    A Working Party on International Evaluation Co-operation was established under the sponsorship of the OECD/NEA Nuclear Science Committee (NSC) to promote the exchange of information on nuclear data evaluations, validation and related topics. Its aim is also to provide a framework for co-operative activities between members of the major nuclear data evaluation projects. This includes the possible exchange of scientists in order to encourage co-operation. Requirements for experimental data resulting from this activity are compiled. The working party determines common criteria for evaluated nuclear data files with a view to assessing and improving the quality and completeness of evaluated data. The parties to the project are: ENDF (United States), JEFF/EFF (NEA Data Bank member countries) and JENDL (Japan). Co-operation with evaluation projects of non-OECD countries is organised through the Nuclear Data Section of the International Atomic Energy Agency (IAEA). This report was issued by Subgroup 7, which was in charge of producing new evaluated neutron cross-section standards. When starting the project, there was a general consensus on the need to update these standards, as significant improvements had been made to the experimental database since 1991 when the last evaluation of these standards was performed. The present work was accomplished through efficient collaboration between a task force of the US Cross-section Evaluation Working Group (CSEWG), a Co-ordinated Research Project (CRP) of the International Atomic Energy Agency (IAEA) and Subgroup 7 of the Working Party on International Evaluation Co-operation (WPEC) of the NEA Nuclear Science Committee. Work is reported on the results of an international effort to evaluate the neutron cross-section standards. The evaluations include the H(n,n), 6 Li(n,t), 10 B(n,α), 10 B(n,α1γ), 197 Au(n,γ), 235 U(n,f) and 238 U(n,f) standard reactions. Evaluations were also produced for the non-standard 238 U(n,γ) and 239 Pu

  17. Radioactive acid digestion test unit nonradioactive startup operations

    International Nuclear Information System (INIS)

    Allen, C.R.; Cowan, R.G.; Crippen, M.D.; Divine, J.R.

    1978-05-01

    The Radioactive Acid Digestion Test Unit (RADTU) will process 5 kg/hour of combustible solid waste and is designed to handle almost all solid combustible waste found in plutonium processing with plutonium contamination levels up to scrap. The RADTU is designed with special safety features to safely contain high masses of fissile materials and to safely handle unusual materials and reactive chemicals which may find their way into the waste. Nonradioactive operating experience to date has been very satisfactory. RADTU has been operated for extended runs on both a 24-hour per day basis as well as on a one shift per day basis. Some minor operating problems have been encountered as expected in a shakedown operation. In general, solutions to these have been readily found. 12 figures

  18. Units of Instruction. Health Occupations Education. Volume I. [Teacher's Guide].

    Science.gov (United States)

    East Texas State Univ., Commerce. Occupational Curriculum Lab.

    Ten units on health occupations are presented in this teacher's guide. The units are the following: recording vital signs; job application and interview; grooming and personal hygiene; health careers; medical careers; medical ethics; medical terminology and abbreviations; medical asepsis; basic patient care (e.g., measuring and recording fluid…

  19. Advanced Transport Operating System (ATOPS) control display unit software description

    Science.gov (United States)

    Slominski, Christopher J.; Parks, Mark A.; Debure, Kelly R.; Heaphy, William J.

    1992-01-01

    The software created for the Control Display Units (CDUs), used for the Advanced Transport Operating Systems (ATOPS) project, on the Transport Systems Research Vehicle (TSRV) is described. Module descriptions are presented in a standardized format which contains module purpose, calling sequence, a detailed description, and global references. The global reference section includes subroutines, functions, and common variables referenced by a particular module. The CDUs, one for the pilot and one for the copilot, are used for flight management purposes. Operations performed with the CDU affects the aircraft's guidance, navigation, and display software.

  20. An ancient relation between units of length and volume based on a sphere.

    Directory of Open Access Journals (Sweden)

    Elena Zapassky

    Full Text Available The modern metric system defines units of volume based on the cube. We propose that the ancient Egyptian system of measuring capacity employed a similar concept, but used the sphere instead. When considered in ancient Egyptian units, the volume of a sphere, whose circumference is one royal cubit, equals half a hekat. Using the measurements of large sets of ancient containers as a database, the article demonstrates that this formula was characteristic of Egyptian and Egyptian-related pottery vessels but not of the ceramics of Mesopotamia, which had a different system of measuring length and volume units.

  1. Diagnostic imaging procedure volume in the United States

    International Nuclear Information System (INIS)

    Johnson, J.L.; Abernathy, D.L.

    1983-01-01

    Comprehensive data on 1979 and 1980 diagnostic imaging procedure volume were collected from a stratified random sample of U.S. short-term general-care hospitals and private practices of radiologists, cardiologists, obstetricians/gynecologists, orthopedic surgeons, and neurologists/neurosurgeons. Approximately 181 million imaging procedures (within the study scope) were performed in 1980. Despite the rapidly increasing use of newer imaging methods, plain film radiography (140.3 million procedures) and contrast studies (22.9 million procedures) continue to comprise the vast majority of diagnostic imaging volume. Ultrasound, computed tomography, nuclear medicine, and special procedures make up less than 10% of total diagnostic imaging procedures. Comparison of the data from this study with data from an earlier study indicates that imaging procedure volume in hospitals expanded at an annual growth rate of almost 8% from 1973 to 1980

  2. SCOPING SUMMARY FOR THE P-AREA OPERABLE UNIT

    International Nuclear Information System (INIS)

    Kupar, J; Sadika Baladi, S; Mark Amidon, M

    2007-01-01

    This scoping summary supports development of the combined Remedial Investigation (RI)/Baseline Risk Assessment (BRA)/Feasibility Study (FS) for the P-Area Operable Unit (PAOU), or Combined document, which will be submitted on or before 09/28/2007. The objective of this Feasibility Study scoping summary meeting is to agree on the likely response actions to be evaluated and developed as alternatives in the combined document and agree on the uncertainties identified and whether they have been adequately managed

  3. SCOPING SUMMARY FOR THE P-AREA OPERABLE UNIT

    Energy Technology Data Exchange (ETDEWEB)

    Kupar, J; Sadika Baladi, S; Mark Amidon, M

    2007-05-22

    This scoping summary supports development of the combined Remedial Investigation (RI)/Baseline Risk Assessment (BRA)/Feasibility Study (FS) for the P-Area Operable Unit (PAOU), or Combined document, which will be submitted on or before 09/28/2007. The objective of this Feasibility Study scoping summary meeting is to agree on the likely response actions to be evaluated and developed as alternatives in the combined document and agree on the uncertainties identified and whether they have been adequately managed.

  4. The Relationship between the Introvert and Extravert Dichotomy and Small Unit Recruiting Volume Production within the Watertown Recruiting Company

    Science.gov (United States)

    2016-05-22

    RECRUITING COMPANY A thesis presented to the Faculty of the U.S. Army Command and General Staff College in partial fulfillment of the...including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and...Unit Recruiting Volume Production Within The Watertown Recruiting Company 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER

  5. Electric power annual 1994. Volume 2, Operational and financial data

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-28

    This year, the annual is published in two volumes. Volume I focused on US electric utilities and contained final 1994 data on net generation, fossil fuel consumption, stocks, receipts, and cost. This Volume II presents annual 1994 summary statistics for the electric power industry, including information on both electric utilities and nonutility power producers. Included are preliminary data for electric utility retail sales of electricity, associated revenue, and average revenue per kilowatthour of electricity sold (based on form EIA-861) and for electric utility financial statistics, environmental statistics, power transactions, and demand- side management. Final 1994 data for US nonutility power producers on installed capacity and gross generation, as well as supply and disposition information, are also provided in Volume II. Technical notes and a glossary are included.

  6. 100-KR-1 Operable Unit focused feasibility study report

    International Nuclear Information System (INIS)

    1994-11-01

    The standard Comprehensive Environmental Response, Compensation, and Liability Act of 1980 Feasibility Study (FS) includes development and screening of alternatives and the detailed analysis of alternatives. This focused feasibility study (FFS) was conducted for the 100-KR-1 Operable Unit at the Hanford Site in southeastern Washington. The objective of this operable unit-specific FFS is to provide decision makers with sufficient information to allow appropriate and timely selection of interim remedial measures (IRM) for the five sites (116-K-1 crib, 116-K-2 trench, 116-KE-4 and 116-KW-3 retention basins, and process effluent pipelines) associated with the 100-KR-1 Operable Unit. The IRM candidate waste sites are determined in the limited field investigation. Site profiles are developed for each of these waste site. The site profiles are used in the application of the plug-in approach. The waste site either plugs into the analysis of the alternatives for the group, or deviations from the developed group alternatives are described and documented

  7. Stereolithographic volume evaluation of healing and shaping after rhinoplasty operations.

    Science.gov (United States)

    Tatlidede, Soner; Turgut, Gürsel; Gönen, Emre; Kayali, Mahmut Ulvi; Baş, Lütfü

    2009-07-01

    Nasal edema and volume changes are unavoidable processes during the healing period after rhinoplasty. Various applications were reported regarding the prevention of early edema; however, the literature shows no study focused on the course of the nasal edema and volume changes up-to-date. We aimed to study the nasal volume changes during the first year of postoperative healing period and to form a recovery and volume change diagram with the obtained data. We prepared standard frames and nasal molds of 7 rhinoplasty patients at regular time intervals (preoperative period and at the postoperative 1st, 2nd, 4th, 8th, 12th, 24th, and 52nd weeks). Plaster nasal models were created by using these molds. Volumes of models were measured by computed tomographic scanning and three-dimensional image processing programs. According to our results, the nasal edema reaches its maximum level at the postoperative fourth week and then rapidly decreases until its minimum level at the eighth week. In contrast with the general opinion, the nasal volume begins to increase smoothly reaching to a level minimally below the preoperative value by the end of the first year.

  8. Licensed operating reactors. Operating units status report, data as of 2-28-79

    International Nuclear Information System (INIS)

    1979-03-01

    This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices and IE Headquarters; and the third section is an appendix containing comparative statistics of U.S. nuclear/fossil capacity, identification of nuclear power plants within regional Electric Reliability Councils, the relative status of U.S. nuclear electric production to all U.S. electric production by state, and selected Edison Electric Institute operating statistics. Throughout the report, statistical factors for periods greater than a report month, or for more than one unit, are computed as the arithmetic average of each unit's individual operating statistics. The statistical factors for each unit for the report month are computed from actual power production for the month. The factors for the life-span of each unit (the ''Cumulative'' column) are reported by the utility and are not entirely re-computed by NRC. Utility power production data is checked for consistency with previously submitted statistics

  9. United States Coast Pilot (volume 1 through 9)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The United States Coast Pilot is a series of 9 nautical books that cover a wide variety of information important to navigators of U.S. coastal and intercoastal...

  10. Summary of Notifiable Diseases, United States. Volume 45, Number 53.

    Science.gov (United States)

    1997-10-31

    Trichinosis Tuberculosis Typhoid fever Yellow fever NOTE: Although varicella is not a nationally notifiable disease, the Council of State and...plague among humans, two of which were fatal, were re- ported in the United States (two cases in Arizona, one in Colorado, and two in New Mexico ). Both...13 cases per year) were reported in the United States. Of these cases, 80% occurred in the southwestern states of New Mexico , Arizona, and

  11. Treatability test plan for the 200-ZP-1 operable unit

    International Nuclear Information System (INIS)

    1994-07-01

    This document presents the treatability test plan for pilot-scale pump and treat testing at the 200-ZP-1 Operable Unit. The approach discussed in this treatability test plan is to conduct a pilot-scale pump and treat test for the contaminant plume associated with the 200-ZP-1 Operable Unit. The primary contaminants of concern are carbon tetrachloride, chloroform, and trichloroethylene (TCE). The pilot-scale treatability testing has as its primary purpose to assess the performance of aboveground treatment systems with respect to the ability to remove the primary contaminants present in groundwater withdrawn from the contaminant plume. The overall scope of this test plan includes: description of the pump and treat system to be tested, as well as the test performance objectives and data quality objectives (DQOs) that will be used to evaluate the effectiveness of the pilot-scale treatment system; discussion of the treatment technology to be tested and supporting development activities, including process flow and conceptual design descriptions and equipment, fabrication, utility, and system startup needs; description of pilot-scale treatment system performance, operating procedures, and operational controls, as well as anticipated monitoring activities, analytes, parameters, analytical procedures, and quality assurance protocols; summaries of other related treatability testing elements, including personnel and environmental health and safety controls, process and secondary waste management and disposition, schedule, and program organization

  12. Heat recovery unit operation of HVAC system in IMEF

    International Nuclear Information System (INIS)

    Paek, S. R.; Oh, Y. W.; Song, E. S.; Park, D. K.; Joo, Y. S.; Hong, K. P.

    2003-01-01

    HVAC system including a supply and exhaust air system in IMEF(Irradiated Materials Examination Facility) is an essential facility for preventing a leakage of radioactive materials and for a preservation of a working environment. It costs a lot to operate the HVAC system in IMEF because our ventilation type is once-through system, and an air flow is maintained from low level contamination area to high level and maintained high turns of ventilation air under certain conditions. As HRU(Heat Recovery Unit) at HVAC system based on PIEF(Post Irradiation Examination Facility) operation experiences is designed and adopted, it prevents from a heating coil freezing destruction in winter and makes much energy saving etc.. Heat pipe type HRU is adopted in IMEF, and a construction and operation result of HRU is examined

  13. Initial 12-h operative fluid volume is an independent risk factor for pleural effusion after hepatectomy.

    Science.gov (United States)

    Cheng, Xiang; Wu, Jia-Wei; Sun, Ping; Song, Zi-Fang; Zheng, Qi-Chang

    2016-12-01

    Pleural effusion after hepatectomy is associated with significant morbidity and prolonged hospital stays. Several studies have addressed the risk factors for postoperative pleural effusion. However, there are no researches concerning the role of the initial 12-h operative fluid volume. The aim of this study was to evaluate whether the initial 12-h operative fluid volume during liver resection is an independent risk factor for pleural effusion after hepatectomy. In this study, we retrospectively analyzed clinical data of 470 patients consecutively undergoing elective hepatectomy between January 2011 and December 2012. We prospectively collected and retrospectively analyzed baseline and clinical data, including preoperative, intraoperative, and postoperative variables. Univariate and multivariate analyses were carried out to identify whether the initial 12-h operative fluid volume was an independent risk factor for pleural effusion after hepatectomy. The multivariate analysis identified 2 independent risk factors for pleural effusion: operative time [odds ratio (OR)=10.2] and initial 12-h operative fluid volume (OR=1.0003). Threshold effect analyses revealed that the initial 12 h operative fluid volume was positively correlated with the incidence of pleural effusion when the initial 12-h operative fluid volume exceeded 4636 mL. We conclude that the initial 12-h operative fluid volume during liver resection and operative time are independent risk factors for pleural effusion after hepatectomy. Perioperative intravenous fluids should be restricted properly.

  14. Turnaround operations analysis for OTV. Volume 2: Detailed technical report

    Science.gov (United States)

    1988-01-01

    The objectives and accomplishments were to adapt and apply the newly created database of Shuttle/Centaur ground operations. Previously defined turnaround operations analyses were to be updated for ground-based OTVs (GBOTVs) and space-based OTVs (SBOTVs), design requirements identified for both OTV and Space Station accommodations hardware, turnaround operations costs estimated, and a technology development plan generated to develop the required capabilities. Technical and programmatic data were provided for NASA pertinent to OTV round and space operations requirements, turnaround operations, task descriptions, timelines and manpower requirements, OTV modular design and booster and Space Station interface requirements. SBOTV accommodations development schedule, cost and turnaround operations requirements, and a technology development plan for ground and space operations and space-based accommodations facilities and support equipment. Significant conclusion are discussed.

  15. Point-to-Point! Validation of the Small Aircraft Transportation System Higher Volume Operations Concept

    Science.gov (United States)

    Williams, Daniel M.

    2006-01-01

    Described is the research process that NASA researchers used to validate the Small Aircraft Transportation System (SATS) Higher Volume Operations (HVO) concept. The four phase building-block validation and verification process included multiple elements ranging from formal analysis of HVO procedures to flight test, to full-system architecture prototype that was successfully shown to the public at the June 2005 SATS Technical Demonstration in Danville, VA. Presented are significant results of each of the four research phases that extend early results presented at ICAS 2004. HVO study results have been incorporated into the development of the Next Generation Air Transportation System (NGATS) vision and offer a validated concept to provide a significant portion of the 3X capacity improvement sought after in the United States National Airspace System (NAS).

  16. WTP Waste Feed Qualification: Glass Fabrication Unit Operation Testing Report

    Energy Technology Data Exchange (ETDEWEB)

    Stone, M. E. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL). Hanford Missions Programs; Newell, J. D. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL). Process Technology Programs; Johnson, F. C. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL). Engineering Process Development; Edwards, T. B. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL). Engineering Process Development

    2016-07-14

    The waste feed qualification program is being developed to protect the Hanford Tank Waste Treatment and Immobilization Plant (WTP) design, safety basis, and technical basis by assuring waste acceptance requirements are met for each staged waste feed campaign prior to transfer from the Tank Operations Contractor to the feed receipt vessels inside the Pretreatment Facility. The Waste Feed Qualification Program Plan describes the three components of waste feed qualification: 1. Demonstrate compliance with the waste acceptance criteria 2. Determine waste processability 3. Test unit operations at laboratory scale. The glass fabrication unit operation is the final step in the process demonstration portion of the waste feed qualification process. This unit operation generally consists of combining each of the waste feed streams (high-level waste (HLW) and low-activity waste (LAW)) with Glass Forming Chemicals (GFCs), fabricating glass coupons, performing chemical composition analysis before and after glass fabrication, measuring hydrogen generation rate either before or after glass former addition, measuring rheological properties before and after glass former addition, and visual observation of the resulting glass coupons. Critical aspects of this unit operation are mixing and sampling of the waste and melter feeds to ensure representative samples are obtained as well as ensuring the fabrication process for the glass coupon is adequate. Testing was performed using a range of simulants (LAW and HLW simulants), and these simulants were mixed with high and low bounding amounts of GFCs to evaluate the mixing, sampling, and glass preparation steps in shielded cells using laboratory techniques. The tests were performed with off-the-shelf equipment at the Savannah River National Laboratory (SRNL) that is similar to equipment used in the SRNL work during qualification of waste feed for the Defense Waste Processing Facility (DWPF) and other waste treatment facilities at the

  17. Operation of the radioactive acid-digestion test unit (RADTU)

    International Nuclear Information System (INIS)

    Blasewitz, A.G.; Allen, C.R.; Lerch, R.E.; Ely, P.C.; Richardson, G.L.

    1981-01-01

    At the Karlsruhe Nuclear Research Center, research and development work concerned with the acid digestion of combustible waste with high plutonium content is being carried out. The main objectives are the reduction of the waste volume, the recovery of the plutonium and the transformation of the process residues into a product suitable for final disposal. For this purpose an inactive demonstration plant with a throughput of 1.5 kg/h has been constructed. In the first version, the reactor of this plant was a tray reactor of the HEDL type. During test operations the sedimentation of a residue was observed on the tray. The density of this residue was higher than that of the residue suspended in the reaction acid. Experiments using tantalum oxide (D=8.4 g/cm 3 ) to simulate the plutonium oxide (D=11.5 g/cm 3 ) have verified this observation. This means that in active operation a sedimentation of plutonium oxide on the tray is to be expected. With respect to these results a new reactor was developed where the settling of the residue is avoided by appropriate design and high circulation velocity of the reaction acid. The reactor consists of a tube 50-80 mm in diameter, which is curved to form a closed loop with an arm length of about 1x1 m. Since October 1979 this ring reactor has been under inactive test operation. Its behaviour is very stable. The velocity of the reaction acid in the heater is 0.5-1 m/s. A settling of residues or tantalum oxide has not been observed. The throughput attained is comparable to that of the tray reactor but the space requirement is three times smaller, and the volume of the reaction acid four times smaller. (author)

  18. The quality of operative notes at a general surgery unit.

    Science.gov (United States)

    Rogers, A; Bunting, M; Atherstone, A

    2008-09-01

    With the increasingly litigious nature of medical practice, accurate documentation is critical. This is particularly true for operative procedures, and medical councils have identified this and published guidelines to aid surgeons. However, these remain a frequently cited weakness in their defence in medico-legal cases. This study assessed the accuracy of operative notes in a general surgery unit in order to improve our practice. An audit of 100 consecutive operative notes was performed, and notes were assessed using the Royal College of Surgeons guidelines. The quality of note-taking of trainees was compared with that of consultant surgeons. A series of operation note pro formas was designed in response to the findings. Of the notes, 66% were completed by trainees. The vast majority of notes had no diagram to demonstrate the surgical findings or illustrate the actions. Specialist surgeons were more likely to describe the actions accurately, but less likely to describe wound closure methods or dressings used. They were also less likely to complete adequate postoperative orders. This study identifies key areas of weakness in our operative note-keeping. Pro formas should be introduced and made available for commonly performed procedures, and diagrams should be used wherever possible.

  19. Operating reactors licensing actions summary. Volume 5, No. 2

    International Nuclear Information System (INIS)

    1985-04-01

    The Operating Reactors Licensing Actions Summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management. This summary report is published primarily for internal NRC use in managing the Operating Reactors Licensing Actions Program

  20. Training operators of VVER-1000 units in Eastern Europe

    International Nuclear Information System (INIS)

    Normand, X.; Nabet, E.; Hauesberger, P.

    1996-01-01

    The VVER 1000 is the most recent nuclear reactor designed in the former Soviet Union. Its design and operation principles are close to Western four-loop reactors in the 1000- to 1500-MW class; therefore, the Western simulation technology is usually directly applicable to the simulation of these units. Moreover, the current number of state-of-the-art training simulators in operation is very limited. A total of 19 units are in operation, while only 2 modern simulators are available (full-scope type) in Balakovo and Zaporozhe. Access to these simulators is practically limited to the respective plants' trainees, which means that the other units have to be satisfied with hands-on training. Facing this situation and taking into account the predicted lifetime of these plants (15 to 25 yr to go, maybe more), a lot of effort has been made in recent years to provide the plants with modern simulators. The major hurdles to this action were obviously financial and technical (availability of codes, computers, software tools). Today, one full-scope project (Kalinin) is almost complete, and three have been announced (Novovoronezh, Khmelnitsky, Kozloduy). Full-scope simulators are clearly the ultimate target of a concerned power plants. However, all users do realize the advantages of the complementary approach with compact simulators: 1. They can be available quickly for starting the training process. 2. They cover a training field that is not (or partly) addressed by full-scope simulators, i.e., the demonstration of physical phenomena in normal and accidental situations

  1. The role of heat pipes in intensified unit operations

    International Nuclear Information System (INIS)

    Reay, David; Harvey, Adam

    2013-01-01

    Heat pipes are heat transfer devices that rely, most commonly, on the evaporation and condensation of a working fluid contained within them, with passive pumping of the condensate back to the evaporator. They are sometimes referred to as ‘thermal superconductors’ because of their exceptionally high effective thermal conductivity (substantially higher than any metal). This, together with several other characteristics make them attractive to a range of intensified unit operations, particularly reactors. The majority of modern computers deploy heat pipes for cooling of the CPU. The application areas of heat pipes come within a number of broad groups, each of which describes a property of the heat pipe. The ones particularly relevant to chemical reactors are: i. Separation of heat source and sink. ii. Temperature flattening, or isothermalisation. iii. Temperature control. Chemical reactors, as a heat pipe application area, highlight the benefits of the heat pipe based on isothermalisation/temperature flattening device and on being a highly effective heat transfer unit. Temperature control, done passively, is also of relevance. Heat pipe technology offers a number of potential benefits to reactor performance and operation. The aim of increased yield of high purity, high added value chemicals means less waste and higher profitability. Other intensified unit operations, such as those employing sorption processes, can also profit from heat pipe technology. This paper describes several variants of heat pipe and the opportunities for their use in intensified plant, and will give some current examples. -- Highlights: ► Heat pipes – thermal superconductors – can lead to improved chemical reactor performance. ► Isothermalisation within a reactor vessel is an ideal application. ► The variable conductance heat pipe can control reaction temperatures within close limits. ► Heat pipes can be beneficial in intensified reactors

  2. Feasibility Study for Operable Unit 7-13/14

    International Nuclear Information System (INIS)

    K. Jean Holdren Thomas E. Bechtold Brian D. Preussner

    2007-01-01

    The Subsurface Disposal Area is a radioactive waste landfill located within the Radioactive Waste Management Complex at the Idaho National Laboratory Site in southeastern Idaho. This Feasibility Study for Operable Unit 7-13/14 analyzes options for mitigating risks to human health and the environment associated with the landfill. Analysis is conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act, using nine evaluation criteria to develop detailed and comparative analysis of five assembled alternatives. Assembled alternatives are composed of discrete modules. Ultimately, decision-makers will select, recombine, and sum various modules into an optimized preferred alternative and final remedial decision

  3. Feasibility Study for Operable Unit 7-13/14

    Energy Technology Data Exchange (ETDEWEB)

    K. Jean Holdren

    2007-05-29

    The Subsurface Disposal Area is a radioactive waste landfill located within the Radioactive Waste Management Complex at the Idaho National Laboratory Site in southeastern Idaho. This Feasibility Study for Operable Unit 7-13/14 analyzes options for mitigating risks to human health and the environment associated with the landfill. Analysis is conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act, using nine evaluation criteria to develop detailed and comparative analysis of five assembled alternatives. Assembled alternatives are composed of discrete modules. Ultimately, decision-makers will select, recombine, and sum various modules into an optimized preferred alternative and final remedial decision.

  4. Article separation apparatus and method for unit operations

    Science.gov (United States)

    Pardini, Allan F.; Gervais, Kevin L.; Mathews, Royce A.; Hockey, Ronald L.

    2010-06-22

    An apparatus and method are disclosed for separating articles from a group of articles. The apparatus includes a container for containing one or more articles coupled to a suitable fluidizer for suspending articles within the container and transporting articles to an induction tube. A portal in the induction tube introduces articles singly into the induction tube. A vacuum pulls articles through the induction tube separating the articles from the group of articles in the container. The apparatus and method can be combined with one or more unit operations or modules, e.g., for inspecting articles, assessing quality of articles, or ascertaining material properties and/or parameters of articles, including layers thereof.

  5. Operating reactors licensing actions summary. Volume 5, No. 7

    International Nuclear Information System (INIS)

    1985-09-01

    The Operating Reactors Licensing Actions Summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management

  6. The Small Aircraft Transportation System (SATS), Higher Volume Operations (HVO) Concept and Research

    Science.gov (United States)

    Baxley, B.; Williams, D.; Consiglio, M.; Adams, C.; Abbott, T.

    2005-01-01

    The ability to conduct concurrent, multiple aircraft operations in poor weather at virtually any airport offers an important opportunity for a significant increase in the rate of flight operations, a major improvement in passenger convenience, and the potential to foster growth of operations at small airports. The Small Aircraft Transportation System, (SATS) Higher Volume Operations (HVO) concept is designed to increase capacity at the 3400 non-radar, non-towered airports in the United States where operations are currently restricted to one-in/one-out procedural separation during low visibility or ceilings. The concept s key feature is that pilots maintain their own separation from other aircraft using air-to-air datalink and on-board software within the Self-Controlled Area (SCA), an area of flight operations established during poor visibility and low ceilings around an airport without Air Traffic Control (ATC) services. While pilots self-separate within the SCA, an Airport Management Module (AMM) located at the airport assigns arriving pilots their sequence based on aircraft performance, position, winds, missed approach requirements, and ATC intent. The HVO design uses distributed decision-making, safe procedures, attempts to minimize pilot and controller workload, and integrates with today's ATC environment. The HVO procedures have pilots make their own flight path decisions when flying in Instrument Metrological Conditions (IMC) while meeting these requirements. This paper summarizes the HVO concept and procedures, presents a summary of the research conducted and results, and outlines areas where future HVO research is required. More information about SATS HVO can be found at http://ntrs.nasa.gov.

  7. TMS communications software. Volume 2: Bus interface unit

    Science.gov (United States)

    Gregor, P. J.

    1979-01-01

    A data bus communication system to support the space shuttle's Trend Monitoring System (TMS) and to provide a basis for evaluation of the bus concept is described. Installation of the system included developing both hardware and software interfaces between the bus and the specific TMS computers and terminals. The software written for the microprocessor-based bus interface units is described. The software implements both the general bus communications protocol and also the specific interface protocols for the TMS computers and terminals.

  8. Operational benchmark for VVER-1000, unit 6, Kozloduy NPP

    International Nuclear Information System (INIS)

    Apostolov, T.; Petrov, B.

    1999-01-01

    Benchmark calculations have been carried out using the 3D nodal code TRAPEZ. Global neutron-physics characteristics of the VVER-1000 core, Kozloduy NPP Unit 6, have been determined taking into account the real loading patterns and operational history of the first three cycles. The code TRLOAD has been used to perform the fuel reloading between any two cycles. The reactor and components descriptions as well as material compositions are given. The results presented include the critical boric acid concentration, the radial power distribution, the axial power distribution for the maximum overload assembly, and the burnup distribution at three different moments during each cycle. Calculated values have been compared with measured data. It is shown that the results obtained by the TRAPEZ code are in good agreement with the experimental data. The information presented could serve as a test case for validation of code packages designed for analyzing the steady-state operation of VVERs. (author)

  9. Operational aerial snow surveying in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Peck, E L; Carroll, T R; Vandemark, S C

    1980-03-01

    An airborne gamma radiation detector and data acquisition system has been designed for rapid measurement of the snow cover water equivalent over large open areas. Research and field tests conducted prior to the implementation of an operational snow measurement system in the United States are reviewed. Extensive research test flights were conducted over large river basins of the north-central plains and in the high mountain valleys of the inter-mountain West. Problems encountered during development include: (1) error in the gross gamma flux produced by atmospheric radon gas daughters; (2) spatial and temporal variability in soil moisture; and (3) errors in gamma radiation count rate introduced by aircraft and cosmic background radiation. Network design of operational flight line and ground observation data used in a river forecasting system are discussed. 22 references, 4 figures, 2 tables.

  10. Journal of Special Operations Medicine, Volume 6, Edition 3

    Science.gov (United States)

    2006-01-01

    between the lower leg muscular planes. These are often times located in multiple places and not radiographically detectable. Volume 6, Edition 3...tinged. Physical examination was remarkable for rales and rhonchi at the left base. There was no jugular venous distension or tracheal deviation... muscular or subcutaneous epinephrine are the first-line treatments for these rare but serious conditions; respi- ratory and intravascular fluid may

  11. Journal of Special Operations Medicine, Volume 2, Edition 3

    Science.gov (United States)

    2002-01-01

    muscle necrosis is extensive it produces a tissue lysis syndrome with lactic acidosis, hyperkalemia, hyperuricemia, hyperphosphatemia, hypocalcemia ... adults , and may require adjust- ment for elderly or very young patients. Volume 2, Edition 3 / Summer 02 27 6. Costrini A: Emergency treatment of...completed annual refresher training in direct laryngoscopy three days prior to this study. A LaedralTM adult intubating manikin was used as the patient in

  12. Operating reactors licensing actions summary. Volume 5, No. 6

    International Nuclear Information System (INIS)

    1985-08-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management. This summary report is published for internal NRC use in managing the Operating Reactors Licensing Actions Program. Its content will change based on NRC management informational requirements

  13. 100-BC-1 Operable Unit focused feasibility study

    International Nuclear Information System (INIS)

    Day, R.E.

    1994-01-01

    The standard Comprehensive Environmental Response, Compensation, and Liability Act feasibility study includes development and screening of alternatives (Phases 1 and 2) and the detailed analysis of alternatives (Phase 3). This focused feasibility study constitutes the Phase 3 portion of the feasibility study process for the remedial alternatives initially developed and screened in the 100 Area Feasibility Study Phases 1 and 2 (DOE-RL 1993a). The focused feasibility study process is conducted in two stages, a Process Document (DOE-RL 1994a) and an operable unit-specific focused feasibility study document, such as this one. The focused feasibility study process is performed by implementing a ''plug-in'' style approach; as defined in greater detail in the Process Document, which is a companion to this document. The objective of this focused feasibility study is to provide decision makers with sufficient information to allow appropriate and timely selection of interim remedial measures for candidate waste sites associated with the 100-BC-1 Operable Unit which is located in the north-central part of the Hanford Site. The interim remedial measure candidate waste sites are determined in the Limited Field Investigation (DOE-RL 1993b). Site profiles are developed for each of these waste sites. The site profiles are used in the application of the plug-in approach. The waste site either plugs into the analysis of the alternatives for the group, or deviations from the developed group alternatives are described and documented

  14. Operating reactors licensing actions summary. Volume 5, Number 1

    International Nuclear Information System (INIS)

    1985-03-01

    This document is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program

  15. Process Improvement to Enhance Quality in a Large Volume Labor and Birth Unit.

    Science.gov (United States)

    Bell, Ashley M; Bohannon, Jessica; Porthouse, Lisa; Thompson, Heather; Vago, Tony

    The goal of the perinatal team at Mercy Hospital St. Louis is to provide a quality patient experience during labor and birth. After the move to a new labor and birth unit in 2013, the team recognized many of the routines and practices needed to be modified based on different demands. The Lean process was used to plan and implement required changes. This technique was chosen because it is based on feedback from clinicians, teamwork, strategizing, and immediate evaluation and implementation of common sense solutions. Through rapid improvement events, presence of leaders in the work environment, and daily huddles, team member engagement and communication were enhanced. The process allowed for team members to offer ideas, test these ideas, and evaluate results, all within a rapid time frame. For 9 months, frontline clinicians met monthly for a weeklong rapid improvement event to create better experiences for childbearing women and those who provide their care, using Lean concepts. At the end of each week, an implementation plan and metrics were developed to help ensure sustainment. The issues that were the focus of these process improvements included on-time initiation of scheduled cases such as induction of labor and cesarean birth, timely and efficient assessment and triage disposition, postanesthesia care and immediate newborn care completed within approximately 2 hours, transfer from the labor unit to the mother baby unit, and emergency transfers to the main operating room and intensive care unit. On-time case initiation for labor induction and cesarean birth improved, length of stay in obstetric triage decreased, postanesthesia recovery care was reorganized to be completed within the expected 2-hour standard time frame, and emergency transfers to the main hospital operating room and intensive care units were standardized and enhanced for efficiency and safety. Participants were pleased with the process improvements and quality outcomes. Working together as a team

  16. Automated processing of whole blood units: operational value and in vitro quality of final blood components.

    Science.gov (United States)

    Jurado, Marisa; Algora, Manuel; Garcia-Sanchez, Félix; Vico, Santiago; Rodriguez, Eva; Perez, Sonia; Barbolla, Luz

    2012-01-01

    The Community Transfusion Centre in Madrid currently processes whole blood using a conventional procedure (Compomat, Fresenius) followed by automated processing of buffy coats with the OrbiSac system (CaridianBCT). The Atreus 3C system (CaridianBCT) automates the production of red blood cells, plasma and an interim platelet unit from a whole blood unit. Interim platelet unit are pooled to produce a transfusable platelet unit. In this study the Atreus 3C system was evaluated and compared to the routine method with regards to product quality and operational value. Over a 5-week period 810 whole blood units were processed using the Atreus 3C system. The attributes of the automated process were compared to those of the routine method by assessing productivity, space, equipment and staffing requirements. The data obtained were evaluated in order to estimate the impact of implementing the Atreus 3C system in the routine setting of the blood centre. Yield and in vitro quality of the final blood components processed with the two systems were evaluated and compared. The Atreus 3C system enabled higher throughput while requiring less space and employee time by decreasing the amount of equipment and processing time per unit of whole blood processed. Whole blood units processed on the Atreus 3C system gave a higher platelet yield, a similar amount of red blood cells and a smaller volume of plasma. These results support the conclusion that the Atreus 3C system produces blood components meeting quality requirements while providing a high operational efficiency. Implementation of the Atreus 3C system could result in a large organisational improvement.

  17. Operating manual for the High Flux Isotope Reactor. Volume I. Description of the facility

    International Nuclear Information System (INIS)

    1982-09-01

    This volume contains a comprehensive description of the High Flux Isotope Reactor Facility. Its primary purpose is to supplement the detailed operating procedures, providing the reactor operators with background information on the various HFIR systems. The detailed operating procdures are presented in another report

  18. Operating manual for the High Flux Isotope Reactor. Volume I. Description of the facility

    Energy Technology Data Exchange (ETDEWEB)

    1982-09-01

    This volume contains a comprehensive description of the High Flux Isotope Reactor Facility. Its primary purpose is to supplement the detailed operating procedures, providing the reactor operators with background information on the various HFIR systems. The detailed operating procdures are presented in another report.

  19. User's operating procedures. Volume 1: Scout project information programs

    Science.gov (United States)

    Harris, C. G.; Harris, D. K.

    1985-01-01

    A review of the user's operating procedures for the Scout Project Automatic Data System, called SPADS is given. SPADS is the result of the past seven years of software development on a Prime minicomputer located at the Scout Project Office. SPADS was developed as a single entry, multiple cross reference data management and information retrieval system for the automation of Project office tasks, including engineering, financial, managerial, and clerical support. The instructions to operate the Scout Project Information programs in data retrieval and file maintenance via the user friendly menu drivers is presented.

  20. Journal of Special Operations Medicine, Volume 3, Edition 2

    Science.gov (United States)

    2003-01-01

    types of fluids and drugs uti - lized and their rates of infusion, as well as the poten- tial for intraosseous infusion in military operations. Many of...Pharmacologic Basis of Therapeutics. Tenth edition: 695 16. American Society of Health-System Pharmacists : AHFS Drug Information. Bethesda, Maryland

  1. Journal of Special Operations Medicine, Volume 3, Edition 3

    Science.gov (United States)

    2003-01-01

    focuses on the basic design, construction, uti - lization, components, and nomenclature associated with the ICS. Objectives: 1. Maximize the overall...TX 76134 9. American Society of Health-System Pharmacists : AHFS Drug Information. Bethesda, Maryland; 2002:1305 Journal of Special Operations

  2. Journal of Special Operations Medicine Volume 1, Edition 1

    Science.gov (United States)

    2001-01-01

    the enemy, and generally regard them with unspo- ken respect. The feelings they must have for those who are realistically threatening their lives...Cobras from the 1st Cav Division area of operation just down to the south of us, Loaches , even a Chi- nook. And fixed wing! We had everything but a B-52

  3. Operating reactors licensing actions summary. Volume 5, No. 9

    International Nuclear Information System (INIS)

    1985-11-01

    This document is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management

  4. Operating reactors licensing actions summary. Volume 5, No. 8

    International Nuclear Information System (INIS)

    1985-10-01

    This summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management

  5. Operating reactors licensing actions summary. Volume 4, No. 9

    International Nuclear Information System (INIS)

    1984-11-01

    This document is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the division of licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management

  6. Better Assessment of Operational Suitability. Volume 2. Case Studies

    Science.gov (United States)

    1992-01-01

    planned but was canceled with the withdrawal of U.S. forces from Viet Nam . 4-2 The program was reinstituted in 1975. The M939 series 5-ton truck resulted...window, but the impact is primarily cosmetic . Video degradation requires prolonged operation in the sand environment and is gradual. In SWA, 24 windows

  7. Transuranic (Tru) waste volume reduction operations at a plutonium facility

    Energy Technology Data Exchange (ETDEWEB)

    Cournoyer, Michael E [Los Alamos National Laboratory; Nixon, Archie E [Los Alamos National Laboratory; Dodge, Robert L [Los Alamos National Laboratory; Fife, Keith W [Los Alamos National Laboratory; Sandoval, Arnold M [Los Alamos National Laboratory; Garcia, Vincent E [Los Alamos National Laboratory

    2010-01-01

    Programmatic operations at the Los Alamos National Laboratory Plutonium Facility (TA 55) involve working with various amounts of plutonium and other highly toxic, alpha-emitting materials. The spread of radiological contamination on surfaces, airborne contamination, and excursions of contaminants into the operator's breathing zone are prevented through use of a variety of gloveboxes (the glovebox, coupled with an adequate negative pressure gradient, provides primary confinement). Size-reduction operations on glovebox equipment are a common activity when a process has been discontinued and the room is being modified to support a new customer. The Actin ide Processing Group at TA-55 uses one-meter-long glass columns to process plutonium. Disposal of used columns is a challenge, since they must be size-reduced to get them out of the glovebox. The task is a high-risk operation because the glass shards that are generated can puncture the bag-out bags, leather protectors, glovebox gloves, and the worker's skin when completing the task. One of the Lessons Learned from these operations is that Laboratory management should critically evaluate each hazard and provide more effective measures to prevent personnel injury. A bag made of puncture-resistant material was one of these enhanced controls. We have investigated the effectiveness of these bags and have found that they safely and effectively permit glass objects to be reduced to small pieces with a plastic or rubber mallet; the waste can then be easily poured into a container for removal from the glove box as non-compactable transuranic (TRU) waste. This size-reduction operation reduces solid TRU waste generation by almost 2% times. Replacing one-time-use bag-out bags with multiple-use glass crushing bags also contributes to reducing generated waste. In addition, significant costs from contamination, cleanup, and preparation of incident documentation are avoided. This effort contributes to the Los Alamos

  8. Transuranic (Tru) waste volume reduction operations at a plutonium facility

    International Nuclear Information System (INIS)

    Cournoyer, Michael E.; Nixon, Archie E.; Dodge, Robert L.; Fife, Keith W.; Sandoval, Arnold M.; Garcia, Vincent E.

    2010-01-01

    Programmatic operations at the Los Alamos National Laboratory Plutonium Facility (TA 55) involve working with various amounts of plutonium and other highly toxic, alpha-emitting materials. The spread of radiological contamination on surfaces, airborne contamination, and excursions of contaminants into the operator's breathing zone are prevented through use of a variety of gloveboxes (the glovebox, coupled with an adequate negative pressure gradient, provides primary confinement). Size-reduction operations on glovebox equipment are a common activity when a process has been discontinued and the room is being modified to support a new customer. The Actin ide Processing Group at TA-55 uses one-meter-long glass columns to process plutonium. Disposal of used columns is a challenge, since they must be size-reduced to get them out of the glovebox. The task is a high-risk operation because the glass shards that are generated can puncture the bag-out bags, leather protectors, glovebox gloves, and the worker's skin when completing the task. One of the Lessons Learned from these operations is that Laboratory management should critically evaluate each hazard and provide more effective measures to prevent personnel injury. A bag made of puncture-resistant material was one of these enhanced controls. We have investigated the effectiveness of these bags and have found that they safely and effectively permit glass objects to be reduced to small pieces with a plastic or rubber mallet; the waste can then be easily poured into a container for removal from the glove box as non-compactable transuranic (TRU) waste. This size-reduction operation reduces solid TRU waste generation by almost 2% times. Replacing one-time-use bag-out bags with multiple-use glass crushing bags also contributes to reducing generated waste. In addition, significant costs from contamination, cleanup, and preparation of incident documentation are avoided. This effort contributes to the Los Alamos National

  9. Explanation of significant differences for the TNX groundwater operable unit

    International Nuclear Information System (INIS)

    Palmer, E.R.

    1997-01-01

    This Explanation of Significant Differences (ESD) is being issued by the Department of Energy (DOE), the lead agency for the Savannah River Site (SRS), with concurrence by the Environmental Protection Agency-Region IV (EPA) and South Carolina Department of Health and Environmental Control (SCDHEC) to announce changes in the interim remediation strategy selected for the TNX Groundwater Operable Unit. The TNX Area is located adjacent to the Savannah River in the southwestern portion of SRS. The remedy selected in the Interim Record of Decision (IROD) to achieve the interim action goals was the Hybrid Groundwater Corrective Action (HGCA). The HGCA consisted of a recirculation well system and an air stripper with a series of groundwater extraction wells. The original remediation strategy needs to be modified because the recirculation well system was determined to be ineffective in this area due to geological factors and the nature of the contamination

  10. Journal of Special Operations Medicine, Volume 7, Edition 1

    Science.gov (United States)

    2007-01-01

    operational funds (OPFUNDs) when available. The local pharmacist provides basic medications and can acquire scarce items when he trav- els to Kandahar...demonstrate a strong capacity to predict resource uti - lization in the contemporary battlefield environment. In the future, such predictive yield could...in Afghanistan. The Russians in Chechnya uti - lized their normal evacuation system designed for conventional war and most often employed ground med

  11. Human Performance in Continuous Operations. Volume 3. Technical Documentation

    Science.gov (United States)

    1980-03-01

    completed for the U. S. Commander, V Corps. Artillery, by Manning (1978). Manning collected information which bears on the following three questions: 0 Can...performance data were not collected in these pre- liminary studies. Field Studies of Continuous Tank OperationsLI __ _ _ __ _ _ _ To simulate a combat...on routine, monotonous tasks tends A show rapid and severe decrement after peri- odk of more than 24 hours without sleep. I Increasing task complexity

  12. Environmental Control Plan for the 300-FF-1 Operable Unit Remedial Action

    International Nuclear Information System (INIS)

    Carlson, R.A.

    2000-01-01

    This environmental control plan is for the 300-FF-1 Operable Unit Remedial Action Project. The purpose of this plan is to identify environmental requirements for the 300-FF-1 operable unit Remedial Action/Waste Disposal Project

  13. Operating the plant, quality assurance, and the job of the operating staff, Volume Twelve

    International Nuclear Information System (INIS)

    Anon.

    1986-01-01

    Subject matter includes operating the plant (the role of the operator, the control room, plant technical specifications, plant operating procedures, initial startup program, BWR/PWR plant startup, BWR/PWR steady state power operation, BWR/PWR transient operation, emergency operation), quality assurance (what is quality, what is quality control, quality assurance includes quality control, government regulation and quality assurance, administrative controls for nuclear power plants, the necessity of reviews and audits, practical quality assurance), and the job of the operating staff (the plant operating staff, plant safety, first aid and resuscitation, general plant hazards, personnel protective equipment, handling chemicals, handling compressed gas, equipment repair and maintenance, communicating with others

  14. Licensed operating reactors: status summary report, data as of May 31, 1983. Volume 7, No. 6

    International Nuclear Information System (INIS)

    1983-06-01

    The US Nuclear Regulatory Commission's monthly Licensed Operating Reactors Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  15. Clinical significance of computed tomography in the measurement of thyroid volume after operation for Basedow's disease

    International Nuclear Information System (INIS)

    Kasuga, Yoshio; Miyakawa, Makoto; Sugenoya, Akira

    1986-01-01

    The postoperative volume of the thyroid glands was measured using computed tomography (CT) in 16 patients with Basedow's disease. In the group which had normal postoperative thyroid function and did not need to receive T 4 , CT showed increase of thyroid volume. In three of the four patients who needed to receive it, CT showed decreased thyroid volume, as compared with that immediately after operation. CT has proved to serve as a tool for measuring postoperative thyroid volume for Basedow's disease in relation to postoperative prognosis. (Namekawa, K.)

  16. Licensed operating reactors. Status summary report, data as of August 31, 1983. Volume 8, No. 9

    International Nuclear Information System (INIS)

    1984-10-01

    This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  17. 77 FR 62247 - Dynamic Positioning Operations Guidance for Vessels Other Than Mobile Offshore Drilling Units...

    Science.gov (United States)

    2012-10-12

    ... Operations Guidance for Vessels Other Than Mobile Offshore Drilling Units Operating on the U.S. Outer... ``Mobile Offshore Drilling Unit Dynamic Positioning Guidance''. The notice recommended owners and operators of Mobile Offshore Drilling Units (MODUs) follow Marine Technology Society (MTS) Dynamic Positioning...

  18. Scale-up of a mixer-settler extractor using a unit operations approach

    International Nuclear Information System (INIS)

    Lindholm, D.C.; Bautista, R.G.

    1976-01-01

    The results of scale-up studies on a continuous, multistage horizontal mixer-settler extractor are presented. The chemical and mechanical system involves the separation of lanthanum from a mixture of rare earth chlorides using di(2-ethylhexyl) phosphoric acid as the solvent and dilute HCl as a scrub solution in a bench scale extractor. Each stage has a hold-up of 2.6 l. A single stage unit is utilized for scale-up studies. Results are obtained on four sizes of geometrically similar units, the largest being six times the volume of the original bench size. A unit operations technique is chosen so that mixing and settling can be examined independently. Variables examined include type of continuous phase, flow rate of inlet streams, and power input to the mixer. Inlet flow-rate ratios are kept constant for all tests. Two potential methods of unbaffled pump-mixer scale-up are explored; the maintenance of constant impeller tip speed and constant power input. For the settler, the previously successful method of basing design on constant flow-rate per unit cross-sectional area is used

  19. Multiobjective Optimization of a Counterrotating Type Pump-Turbine Unit Operated at Turbine Mode

    Directory of Open Access Journals (Sweden)

    Jin-Hyuk Kim

    2014-05-01

    Full Text Available A multiobjective optimization for improving the turbine output and efficiency of a counterrotating type pump-turbine unit operated at turbine mode was carried out in this work. The blade geometry of both the runners was optimized using a hybrid multiobjective evolutionary algorithm coupled with a surrogate model. Three-dimensional Reynolds-averaged Navier-Stokes equations with the shear stress transport turbulence model were discretized by finite volume approximations and solved on hexahedral grids to analyze the flow in the pump-turbine unit. As major hydrodynamic performance parameters, the turbine output and efficiency were selected as objective functions with two design variables related to the hub profiles of both the runner blades. These objectives were numerically assessed at twelve design points selected by Latin hypercube sampling in the design space. Response surface approximation models for the objectives were constructed based on the objective function values at the design points. A fast nondominated sorting genetic algorithm for the local search coupled with the response surface approximation models was applied to determine the global Pareto-optimal solutions. The trade-off between the two objectives was determined and described with respect to the Pareto-optimal solutions. The results of this work showed that the turbine outputs and efficiencies of optimized pump-turbine units were simultaneously improved in comparison to the reference unit.

  20. Operation of Wastewater Treatment Plants: A Field Study Training Program. Volume I. Second Edition.

    Science.gov (United States)

    California State Univ., Sacramento. Dept. of Civil Engineering.

    This manual was prepared by experienced wastewater collection system workers to provide a home study course to develop new qualified workers and expand the abilities of existing workers. This volume is directed primarily towards entry-level operators and the operators of ponds, package plants, or small treatment plants. Ten chapters examine the…

  1. Field Operations and Enforcement Manual for Air Pollution Control. Volume III: Inspection Procedures for Specific Industries.

    Science.gov (United States)

    Weisburd, Melvin I.

    The Field Operations and Enforcement Manual for Air Pollution Control, Volume III, explains in detail the following: inspection procedures for specific sources, kraft pulp mills, animal rendering, steel mill furnaces, coking operations, petroleum refineries, chemical plants, non-ferrous smelting and refining, foundries, cement plants, aluminum…

  2. Recent trends in operator theory and partial differential equations the Roland Duduchava anniversary volume

    CERN Document Server

    Natroshvili, David; Shargorodsky, Eugene; Wendland, Wolfgang

    2017-01-01

    This volume is dedicated to the eminent Georgian mathematician Roland Duduchava on the occasion of his 70th birthday. It presents recent results on Toeplitz, Wiener-Hopf, and pseudodifferential operators, boundary value problems, operator theory, approximation theory, and reflects the broad spectrum of Roland Duduchava's research. The book is addressed to a wide audience of pure and applied mathematicians.

  3. Pre-operative renal volume predicts peak creatinine after congenital heart surgery in neonates.

    Science.gov (United States)

    Carmody, J Bryan; Seckeler, Michael D; Ballengee, Cortney R; Conaway, Mark; Jayakumar, K Anitha; Charlton, Jennifer R

    2014-10-01

    Acute kidney injury is common in neonates following surgery for congenital heart disease. We conducted a retrospective analysis to determine whether neonates with smaller pre-operative renal volume were more likely to develop post-operative acute kidney injury. We conducted a retrospective review of 72 neonates who underwent congenital heart surgery for any lesion other than patent ductus arteriosus at our institution from January 2007 to December 2011. Renal volume was calculated by ultrasound using the prolate ellipsoid formula. The presence and severity of post-operative acute kidney injury was determined both by measuring the peak serum creatinine in the first 7 days post-operatively and by using the Acute Kidney Injury Network scoring system. Using a linear change point model, a threshold renal volume of 17 cm³ was identified. Below this threshold, there was an inverse linear relationship between renal volume and peak post-operative creatinine for all patients (p = 0.036) and the subgroup with a single morphologic right ventricle (p = 0.046). There was a non-significant trend towards more acute kidney injury using Acute Kidney Injury Network criteria in all neonates with renal volume ≤17 cm³ (p = 0.11) and in the subgroup with a single morphologic right ventricle (p = 0.17). Pre-operative renal volume ≤17 cm³ is associated with a higher peak post-operative creatinine and potentially greater risk for post-operative acute kidney injury for neonates undergoing congenital heart surgery. Neonates with a single right ventricle may be at higher risk.

  4. Atlas of United States Trees, Volume 2: Alaska Trees and Common Shrubs.

    Science.gov (United States)

    Viereck, Leslie A.; Little, Elbert L., Jr.

    This volume is the second in a series of atlases describing the natural distribution or range of native tree species in the United States. The 82 species maps include 32 of trees in Alaska, 6 of shrubs rarely reaching tree size, and 44 more of common shrubs. More than 20 additional maps summarize environmental factors and furnish general…

  5. Using a Virtual Manipulative Environment to Support Students' Organizational Structuring of Volume Units

    Science.gov (United States)

    O'Dell, Jenna R.; Barrett, Jeffrey E.; Cullen, Craig J.; Rupnow, Theodore J.; Clements, Douglas H.; Sarama, Julie; Rutherford, George; Beck, Pamela S.

    2017-01-01

    In this study, we investigated how Grade 3 and 4 students' organizational structure for volume units develops through repeated experiences with a virtual manipulative for building prisms. Our data consist of taped clinical interviews within a micro-genetic experiment. We report on student strategy development using a virtual manipulative for…

  6. Human factors review of electric power dispatch control centers. Volume 4. Operator information needs. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Miller, R.J.; Najaf-Zadeh, K.; Darlington, H.T.; McNair, H.D.; Seidenstein, S.; Williams, A.R.

    1982-10-01

    Human factors is a systems-oriented interdisciplinary specialty concerned with the design of systems, equipment, facilities and the operational environment. An important aspect leading to the design requirements is the determination of the information requirements for electric power dispatch control centers. There are significant differences between the system operator's actions during normal and degraded states of power system operation, and power system restoration. This project evaluated the information the operator requires for normal power system and control system operations and investigates the changes of information required by the operator as the power system and/or the control system degrades from a normal operating state. The Phase II study, published in two volumes, defines power system states and control system conditions to which operator information content can be related. This volume presents detailed data concerning operator information needs that identify the needs for and the uses of power system information by a system operator in conditions ranging from normal through degraded operation. The study defines power system states and control system conditions to which operator information content can be related, and it identifies the requisite information as consistent with current industry practice so as to aid control system designers. Training requirements are also included for planning entry-level and follow-on training for operators.

  7. Analysis of remote operating systems for space-based servicing operations, volume 1

    Science.gov (United States)

    1985-01-01

    A two phase study was conducted to analyze and develop the requirements for remote operating systems as applied to space based operations for the servicing, maintenance, and repair of satellites. Phase one consisted of the development of servicing requirements to establish design criteria for remote operating systems. Phase two defined preferred system concepts and development plans which met the requirements established in phase one. The specific tasks in phase two were to: (1) identify desirable operational and conceptual approaches for selected mission scenarios; (2) examine the potential impact of remote operating systems incorporated into the design of the space station; (3) address remote operating systems design issues, such as mobility, which are effected by the space station configuration; and (4) define the programmatic approaches for technology development, testing, simulation, and flight demonstration.

  8. Skin-to-skin holding in the neonatal intensive care unit influences maternal milk volume.

    Science.gov (United States)

    Hurst, N M; Valentine, C J; Renfro, L; Burns, P; Ferlic, L

    1997-01-01

    To evaluate the effect of early initiation of skin-to-skin (STS) holding on lactation, we compared 24-hour milk volumes of mothers of ventilated low birth weight infants in an STS group to mothers in a non-STS control group. Mean 24-hour milk volumes at 2, 3, and 4 weeks after delivery of mothers participating in STS holding were compared with those of a retrospective control group from the 12-month period immediately preceding the introduction of STS holding in the neonatal intensive care unit. A repeated-measures analysis of variance adjusting for baseline volumes (1 week after delivery) was used to evaluate the difference in milk volumes between STS and control groups. Sixteen mothers initiated STS holding during the 2-month study period. Eight mothers met study criteria by initiating STS holding during the first 4 weeks after delivery. During a 2-week period the study group had a strong linear increase in milk volume in contrast to no indicative change of the control group's milk volume. STS holding of low birth weight infants initiated in the early intensive care phase can result in a significant increase in maternal milk volume, thereby overcoming the frequently seen insufficient lactation experienced by these mothers.

  9. 100-HR-2 Operable Unit Focused Feasibility study report

    International Nuclear Information System (INIS)

    1995-01-01

    The standard Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) Feasibility Study (FS) includes development and screening of alternatives (Phases 1 and 2) and the detailed analysis of alternatives (Phase 3). This focused feasibility study (FFS) was conducted for the 100-HR-2 Operable Unit (OU) at the Hanford Site in southeastern Washington. This FFS constitutes the Phase 3 portion of the FS process for the remedial alternatives initially developed and screened in the 100 Area Feasibility Study Phases 1 and 2 (DOE-RL 1993a). The objective of this OU-specific FFS is to provide decision makers with sufficient information to allow appropriate and timely selection of interim remedial measures (IRM) for the seven IRM candidate sites associated with the 100-HR-2 OU. The IRM candidate waste sites identified in Table ES-1 are determined in the limited field investigation (DOE-RL 1994b). Site profiles are developed for each of these waste sites. The site profiles are used in the application of the plug-in approach. The waste site either plugs into the analysis of the alternatives for the group, or deviations from the developed group alternatives are described and documented. A summary for the 100-HR-2 IRM candidate waste site is as follows: none of the waste sites require additional alternative development. six of the seven waste sites directly plug into the waste site group alternatives. The site-specific detailed analysis is conducted, referencing the waste site group analysis as appropriate. A waste site detailed analysis summary is presented in Table ES-1.A comparative analysis of remedial alternatives is presented for each waste site. A summary of the comparative analysis is presented in Table ES-2

  10. Licensed operating reactors. Status summary report, data as of February 28, 1986. Volume 10, No. 3

    International Nuclear Information System (INIS)

    1986-04-01

    This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  11. Licensed operating reactors status summary report, data as of August 31, 1985. Volume 9, No. 9

    International Nuclear Information System (INIS)

    1985-10-01

    This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  12. Licensed operating reactors. Status summary report, data as of May 31, 1986. Volume 10, Number 6

    International Nuclear Information System (INIS)

    1986-08-01

    This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  13. Licensed operating reactors. Status summary report: data as of July 31, 1985. Volume 9, No. 8

    International Nuclear Information System (INIS)

    1985-09-01

    This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Head-quarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capabilitiy, reactor years of experience and non-power reactors in the United States

  14. Licensed operating reactors. Status summary report data as of January 31, 1986. Volume 10, No. 2

    International Nuclear Information System (INIS)

    1986-03-01

    This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  15. The current status of emergency operations at a high-volume cancer center.

    Science.gov (United States)

    Komori, Koji; Kimura, Kenya; Kinoshita, Takashi; Ito, Seiji; Abe, Tetsuya; Senda, Yoshiki; Misawa, Kazunari; Ito, Yuichi; Uemura, Norihisa; Natsume, Seiji; Kawai, Ryosuke; Kawakami, Jiro; Asano, Tomonari; Iwata, Yoshinori; Kurahashi, Shintaro; Tsutsuyama, Masayuki; Shigeyoshi, Itaru; Shimizu, Yasuhiro

    2014-01-01

    This study aimed to assess the pathogenic causes, clinical conditions, surgical procedures, in-hospital mortality, and operative death associated with emergency operations at a high-volume cancer center. Although many reports have described the contents, operative procedures, and prognosis of elective surgeries in high-volume cancer centers, emergency operations have not been studied in sufficient detail. We retrospectively enrolled 28 consecutive patients who underwent emergency surgery. Cases involving operative complications were excluded. The following surgical procedures were performed during emergency operations: closure in 3 cases (10.7%), diversion in 22 cases (78.6%), ileus treatment in 2 cases (7.1%), and hemostasis in 1 case (3.6%). Closure alone was performed only once for peritonitis. Diversion was performed in 17 cases (77.3%) of peritonitis, 4 cases (18.2%) of stenosis of the gastrointestinal tract, and 1 case (4.5%) of bleeding. There was a significant overall difference (P = 0.001). The frequency of emergency operations was very low at a high-volume cancer center. However, the recent shift in treatment approaches toward nonoperative techniques may enhance the status of emergency surgical procedures. The results presented in this study will help prepare for emergency situations and resolve them as quickly and efficiently as possible.

  16. Operator support system for power unit control in abnormal modes of operation

    International Nuclear Information System (INIS)

    Kurka, J.

    1993-01-01

    I and C system technology, partly Soviet and partly Czechoslovakian, used on the NPP Dukovany units represents the control technology standard of late 70-ties and it becomes the weak part of the whole system. The modernization of the system, therefore, is necessary and it is already in preparation. The specification of both the scope and the depth of upgrading/replacement is being carried out within the framework of the PHARE program. The second phase of the program aimed at the final specifications of requirements on new I and C system is in progress. The output will serve as detailed specification for bid invitation for control system supplier. Parallely, the preparation of specification for WWER-440 full-scope plant simulator for operator training is in progress as well. In the case of two units with WWER-1000 MW reactors, the completion of construction of which was even threaten for a certain period of time, essential changes have taken place in the design of both the I and C systems and the reactor core. 7 figs

  17. 40 CFR 60.105a - Monitoring of emissions and operations for fluid catalytic cracking units (FCCU) and fluid coking...

    Science.gov (United States)

    2010-07-01

    ..., Catalytic Reforming Units, and Sulfur Recovery Units. (iii) The owner or operator shall install, operate... for fluid catalytic cracking units (FCCU) and fluid coking units (FCU). 60.105a Section 60.105a... and operations for fluid catalytic cracking units (FCCU) and fluid coking units (FCU). (a) FCCU and...

  18. 77 FR 29701 - Impact of Construction (Under a Combined License) of New Nuclear Power Plant Units on Operating...

    Science.gov (United States)

    2012-05-18

    ... New Nuclear Power Plant Units on Operating Units at Multi-Unit Sites AGENCY: Nuclear Regulatory... construct and operate new nuclear power plants (NPPs) on multi-unit sites to provide an evaluation of the... License) of New Nuclear Power Plants on Operating Units at Multi-Unit Sites (Package). ML112630039 Federal...

  19. 2016 Highlights of Ferry Operations in the United States

    Science.gov (United States)

    2017-10-01

    This publication highlights data collected by the 2016 NCFO. The Bureau of Transportation Statistics (BTS) conducted the NCFO from April through November 2016, collecting the operational characteristics of the 2015 calendar year ferry operations.

  20. Lung protection: an intervention for tidal volume reduction in a teaching intensive care unit

    Science.gov (United States)

    Briva, Arturo; Gaiero, Cristina

    2016-01-01

    Objective To determine the effect of feedback and education regarding the use of predicted body weight to adjust tidal volume in a lung-protective mechanical ventilation strategy. Methods The study was performed from October 2014 to November 2015 (12 months) in a single university polyvalent intensive care unit. We developed a combined intervention (education and feedback), placing particular attention on the importance of adjusting tidal volumes to predicted body weight bedside. In parallel, predicted body weight was estimated from knee height and included in clinical charts. Results One hundred fifty-nine patients were included. Predicted body weight assessed by knee height instead of visual evaluation revealed that the delivered tidal volume was significantly higher than predicted. After the inclusion of predicted body weight, we observed a sustained reduction in delivered tidal volume from a mean (standard error) of 8.97 ± 0.32 to 7.49 ± 0.19mL/kg (p < 0.002). Furthermore, the protocol adherence was subsequently sustained for 12 months (delivered tidal volume 7.49 ± 0.54 versus 7.62 ± 0.20mL/kg; p = 0.103). Conclusion The lack of a reliable method to estimate the predicted body weight is a significant impairment for the application of a worldwide standard of care during mechanical ventilation. A combined intervention based on education and repeated feedbacks promoted sustained tidal volume education during the study period (12 months). PMID:27925055

  1. Unit information system operational displays for VVER-1000 reactors

    International Nuclear Information System (INIS)

    Anikanov, S.S.; Carrera, J.P.; Gordon, P.

    1997-01-01

    The role of high level operational displays is explained as well as the principles of the design of such displays. The tasks of WWER operating personnel are described and the support provided by operational displays is highlighted. The architecture of the displays is also dealt with. (A.K.)

  2. United States Military in Central Asia: Beyond Operation Enduring Freedom

    Science.gov (United States)

    2009-10-23

    Malinowski , advocacy director for Human Rights Watch, stated, “the United States is most effective in promoting liberty around the world when people...26 U.S. President, The National Security Strategy of the United States of America, page? 27 Thomas Malinowski , “Testimony

  3. Operative training in otolaryngology in the United Kingdom: a specialist registrar survey

    NARCIS (Netherlands)

    Georgalas, Christos; Hadjihannas, Edward; Ghufoor, Khalid; Pracy, Paul; Papesch, Michael

    2005-01-01

    OBJECTIVE: To assess the current status of operative training for otolaryngology specialist registrars in the United Kingdom. DESIGN: Web-based questionnaire survey. PARTICIPANTS: All otolaryngology specialist registrars in the United Kingdom. MAIN OUTCOME MEASURES: The overall satisfaction with

  4. Licensed operating reactors. Status summary report: data as of September 30, 1985. Volume 9, No. 10

    International Nuclear Information System (INIS)

    1985-11-01

    This report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Resource Management from the Headquarters staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. The three sections of the report are: monthly highlights and statistics for commercial operating units, and errata from previously reported data; a compilation of detailed information on each unit, provided by NRC's Regional Offices, IE Headquarters and the utilities; and an appendix for miscellaneous information such as spent fuel storage capability, reactor-years of experience and non-power reactors in the US

  5. Determination of Unit Pressure Force in Material Volume in the Course of Refractory Stamping Press Moulding

    Directory of Open Access Journals (Sweden)

    Orłowicz A.W.

    2016-06-01

    Full Text Available The paper presents results of assessment of the unit pressure force within the refractory material volume in the course press-moulding of stampings for refractory precast shapes. The force was evaluated with the use of physical simulation of deformation undergone by lead balls placed in the raw refractory mass subjected to pressing in a metal die. To determine the value of unit pressure force applied to the aggregate grains in the course of stamping press-moulding, physical model of deformation of a sphere induced by the uniaxial stress state was used.

  6. Licensed operating reactors. Status summary report as of February 29, 1984. Volume 8, No. 3

    International Nuclear Information System (INIS)

    1984-04-01

    The US Nuclear Regulatory Commission's monthly Licensed Operating Reactors Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Resource Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement (IE), from NRC's Regional Offices, and from utilities. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  7. Licensed operating reactors: Status summary report, data as of December 31, 1995. Volume 20

    International Nuclear Information System (INIS)

    1996-06-01

    The US Nuclear Regulatory Commission's monthly summary of licensed nuclear power reactor data is based primarily on the operating data report submitted by licensees for each unit. This report is divided into two sections: the first contains summary highlights and the second contains data on each individual unit in commercial operation. Section 1 availability factors, capacity factors, and forced outage rates are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensees and notes to the use of weighted averages and starting dates other than commercial operation are provided

  8. Operating history report for the Peach Bottom HTGR. Volume I. Reactor operating history

    International Nuclear Information System (INIS)

    Scheffel, W.J.; Baldwin, N.L.; Tomlin, R.W.

    1976-01-01

    The operating history for the Peach Bottom-1 Reactor is presented for the years 1966 through 1975. Information concerning general chemistry data, general physics data, location of sensing elements in the primary helium circuit, and postirradiation examination and testing of reactor components is presented

  9. Large-Scale Multi-Resolution Representations for Accurate Interactive Image and Volume Operations

    KAUST Repository

    Sicat, Ronell B.

    2015-11-25

    The resolutions of acquired image and volume data are ever increasing. However, the resolutions of commodity display devices remain limited. This leads to an increasing gap between data and display resolutions. To bridge this gap, the standard approach is to employ output-sensitive operations on multi-resolution data representations. Output-sensitive operations facilitate interactive applications since their required computations are proportional only to the size of the data that is visible, i.e., the output, and not the full size of the input. Multi-resolution representations, such as image mipmaps, and volume octrees, are crucial in providing these operations direct access to any subset of the data at any resolution corresponding to the output. Despite its widespread use, this standard approach has some shortcomings in three important application areas, namely non-linear image operations, multi-resolution volume rendering, and large-scale image exploration. This dissertation presents new multi-resolution representations for large-scale images and volumes that address these shortcomings. Standard multi-resolution representations require low-pass pre-filtering for anti- aliasing. However, linear pre-filters do not commute with non-linear operations. This becomes problematic when applying non-linear operations directly to any coarse resolution levels in standard representations. Particularly, this leads to inaccurate output when applying non-linear image operations, e.g., color mapping and detail-aware filters, to multi-resolution images. Similarly, in multi-resolution volume rendering, this leads to inconsistency artifacts which manifest as erroneous differences in rendering outputs across resolution levels. To address these issues, we introduce the sparse pdf maps and sparse pdf volumes representations for large-scale images and volumes, respectively. These representations sparsely encode continuous probability density functions (pdfs) of multi-resolution pixel

  10. How Can the United States Army Improve Human Intelligence in Peace Operations?

    National Research Council Canada - National Science Library

    Wright, David

    2003-01-01

    .... These secondary collectors, such as the Military Police, Psychological Operations, Civil Affairs and Line Units conduct liaison with international and local police forces, host-government official...

  11. USE OF ELECTRONIC CASE HISTORIES IN OPERATION OF MEDICAL UNITS

    Directory of Open Access Journals (Sweden)

    I. B. Boltenkova

    2016-01-01

    Full Text Available Introduction of electronic case histories to medical units including TB units is one of the factors allowing enhancing quality of medical care provision. Use of the electronic case histories provides conditions for information transparency improvement in a medical unit: financial, statistic and medico-technological. Information contained in the electronic case history is important and required both for internal and external use. Use of electronic case histories contributes to reduction of labor costs of workers in medical units, provides fast access of medical personnel to information, formalizes data, provides preservation, invariance and reliability of the information entered into electronic case history during the whole period of storage, regulates the access rights and confidentiality, personifies data and allows unifying health data of all Russian population into one pool.

  12. Design and operation of gas-heated thermal pumping units

    Energy Technology Data Exchange (ETDEWEB)

    Rostek, H A [Ruhrgas A.G., Essen (Germany, F.R.)

    1979-03-01

    The first gas heat pump systems have been operated since spring 1977. These are applied in living houses, school, swimming pools, and sport places and administration buildings. The heating performance of these systems is 150-3800 kW. Two of these systems, one in a swimming pool and one in a house for several families are operating, each of them for one heating period. The operational experiences with these gas heat pumps are reported on, basing on measurement results. The experience gathered from the operation of gas heat pumps systems is applied to the planning of other plants. The development of a standardized gas heat pump-series is emphasized.

  13. Hanford Environmental Information System (HEIS) Operator`s Manual. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Schreck, R.I.

    1991-10-01

    The Hanford Environmental Information System (HEIS) is a consolidated set of automated resources that effectively manage the data gathered during environmental monitoring and restoration of the Hanford Site. The HEIS includes an integrated database that provides consistent and current data to all users and promotes sharing of data by the entire user community. This manual describes the facilities available to the operational user who is responsible for data entry, processing, scheduling, reporting, and quality assurance. A companion manual, the HEIS User`s Manual, describes the facilities available-to the scientist, engineer, or manager who uses the system for environmental monitoring, assessment, and restoration planning; and to the regulator who is responsible for reviewing Hanford Site operations against regulatory requirements and guidelines.

  14. Analysis of remote operating systems for space-based servicing operations. Volume 2: Study results

    Science.gov (United States)

    1985-01-01

    The developments in automation and robotics have increased the importance of applications for space based servicing using remotely operated systems. A study on three basic remote operating systems (teleoperation, telepresence and robotics) was performed in two phases. In phase one, requirements development, which consisted of one three-month task, a group of ten missions were selected. These included the servicing of user equipment on the station and the servicing of the station itself. In phase two, concepts development, which consisted of three tasks, overall system concepts were developed for the selected missions. These concepts, which include worksite servicing equipment, a carrier system, and payload handling equipment, were evaluated relative to the configurations of the overall worksite. It is found that the robotic/teleoperator concepts are appropriate for relatively simple structured tasks, while the telepresence/teleoperator concepts are applicable for missions that are complex, unstructured tasks.

  15. Operational test procedure for SY tank farm replacement exhauster unit

    International Nuclear Information System (INIS)

    McClees, J.

    1995-01-01

    This operational test procedure will verify that the remaining functions not tested per WHC-SD-WM-ATP-080, or components disturbed during final installation, as well as interfaces with other tank farm equipment and remote monitoring stations are operating correctly

  16. BN-600 power unit 15-year operating experience

    International Nuclear Information System (INIS)

    Saraev, O.M.; Oshkanov, N.N.; Vylomov, V.V.

    1996-01-01

    Comprehensive experience has been gained with the operating fast reactor BN-600 with a power out of 600 MWe. This paper includes important performance results and gives also an overview of the experience gained from BN-600 NPP commercial operation during 15 years. (author). 2 figs, 1 tab

  17. Chemistry in water reactors: operating experience and new developments. 2 volumes

    International Nuclear Information System (INIS)

    1994-01-01

    These proceedings of the International conference on chemistry in water reactors (Operating experience and new developments), Volume 1, are divided into 8 sessions bearing on: (session 1) Primary coolant activity, corrosion products (5 conferences), (session 2) Dose reduction (4 conferences), (session 3) New developments (4 conferences), poster session: Primary coolant chemistry (16 posters), (session 4) Decontamination (5 conferences), poster session (2 posters), (session 5) BWR-Operating experience (3 conferences), (session 6) BWR-Modelling of operating experience (4 conferences), (session 7) BWR-Basic studies (4 conferences), (session 8) BWR-New technologies (3 conferences)

  18. Ground Operations Demonstration Unit for Liquid Hydrogen (GODU LH2)

    Science.gov (United States)

    Notardonato, William U.

    2015-01-01

    When the technology associated with zero loss storage and transfer is implemented, NASA can reduce the LH2 losses and procurement costs by up to 30 compared to historical Shuttle numbers. This return on investment is based on the mission manifest and commodity use. LH2 densification can provide improved launch vehicle ascent performance by minimizing the size of the LH2 tanks or storing more mass of propellant in the given tank volume.

  19. Licensed operating reactors status summary report, data as of December 31, 1985. Volume 10, No. 1

    International Nuclear Information System (INIS)

    1986-01-01

    The US Nuclear Regulatory Commission's monthly Licensed Operating Reactors Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Resource Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. Since all of the data concerning operation of the units is provided by the utility operators less than two weeks after the end of the month, necessary corrections to published information are shown on the Errata page. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  20. Integrated operations plan for the MFTF-B Mirror Fusion Test Facility. Volume I. Organization plan

    International Nuclear Information System (INIS)

    1981-12-01

    This plan and the accompanying MFTF-B Integrated Operations Plan are submitted in response to UC/LLNL Purchase Order 3883801, dated July 1981. The organization plan also addresses the specific tasks and trade studies directed by the scope of work. The Integrated Operations Plan, which includes a reliability, quality assurance, and safety plan and an integrated logistics plan, comprises the burden of the report. In the first section of this volume, certain underlying assumptions and observations are discussed setting the requirements and limits for organization. Section B presents the recommended structure itself. Section C Device Availability vs Maintenance and Support Efforts and Section D Staffing Levels and Skills provide backup detail and justification. Section E is a trade study on maintenance and support by LLNL staff vs subcontract and Section F is a plan for transitioning from the construction phase into operation. A brief summary of schedules and estimated costs concludes the volume

  1. Assembly, operation and disassembly manual for the Battelle Large Volume Water Sampler (BLVWS)

    International Nuclear Information System (INIS)

    Thomas, V.W.; Campbell, R.M.

    1984-12-01

    Assembly, operation and disassembly of the Battelle Large Volume Water Sampler (BLVWS) are described in detail. Step by step instructions of assembly, general operation and disassembly are provided to allow an operator completely unfamiliar with the sampler to successfully apply the BLVWS to his research sampling needs. The sampler permits concentration of both particulate and dissolved radionuclides from large volumes of ocean and fresh water. The water sample passes through a filtration section for particle removal then through sorption or ion exchange beds where species of interest are removed. The sampler components which contact the water being sampled are constructed of polyvinylchloride (PVC). The sampler has been successfully applied to many sampling needs over the past fifteen years. 9 references, 8 figures

  2. Survey of fish impingement at power plants in the United States. Volume I. The Great Lakes

    International Nuclear Information System (INIS)

    Sharma, R.K.; Freeman, R.F. III.

    1977-03-01

    Impingement of fish at cooling-water intakes of 20 power plants located on the Great Lakes has been surveyed and data are presented. Descriptions of site, plant, and intake design and operation are provided. Reports in this volume summarize impingement data for individual plants in tabular and histogram formats. Information was available from differing sources such as the utilities themselves, public documents, regulatory agencies, and others. Thus, the extent of detail in the reports varies greatly from plant to plant. Histogram preparation involved an extrapolation procedure that has inadequacies. The reader is cautioned in the use of information presented in this volume to determine intake-design acceptability or intensity of impacts on ecosystems. No conclusions are presented herein; data comparisons are made in Volume IV

  3. Survey of fish impingement at power plants in the United States. Volume II. Inland waters

    International Nuclear Information System (INIS)

    Freeman, R.F. III; Sharma, R.K.

    1977-03-01

    Impingement of fish at cooling-water intakes of 33 power plants located on inland waters other than the Great Lakes has been surveyed and data are presented. Descriptions of site, plant, and intake design and operation are provided. Reports in this volume summarize impingement data for individual plants in tabular and histogram formats. Information was available from differing sources such as the utilities themselves, public documents, regulatory agencies, and others. Thus, the extent of detail in the reports varies greatly from plant to plant. Histogram preparation involved an extrapolation procedure that has inadequacies. The reader is cautioned in the use of information presented in this volume to determine intake-design acceptability or intensity of impacts on ecosystems. No conclusions are presented herein; data comparisons are made in Volume IV

  4. Impact of an electronic health record operating room management system in ophthalmology on documentation time, surgical volume, and staffing.

    Science.gov (United States)

    Sanders, David S; Read-Brown, Sarah; Tu, Daniel C; Lambert, William E; Choi, Dongseok; Almario, Bella M; Yackel, Thomas R; Brown, Anna S; Chiang, Michael F

    2014-05-01

    Although electronic health record (EHR) systems have potential benefits, such as improved safety and quality of care, most ophthalmology practices in the United States have not adopted these systems. Concerns persist regarding potential negative impacts on clinical workflow. In particular, the impact of EHR operating room (OR) management systems on clinical efficiency in the ophthalmic surgery setting is unknown. To determine the impact of an EHR OR management system on intraoperative nursing documentation time, surgical volume, and staffing requirements. For documentation time and circulating nurses per procedure, a prospective cohort design was used between January 10, 2012, and January 10, 2013. For surgical volume and overall staffing requirements, a case series design was used between January 29, 2011, and January 28, 2013. This study involved ophthalmic OR nurses (n = 13) and surgeons (n = 25) at an academic medical center. Electronic health record OR management system implementation. (1) Documentation time (percentage of operating time documenting [POTD], absolute documentation time in minutes), (2) surgical volume (procedures/time), and (3) staffing requirements (full-time equivalents, circulating nurses/procedure). Outcomes were measured during a baseline period when paper documentation was used and during the early (first 3 months) and late (4-12 months) periods after EHR implementation. There was a worsening in total POTD in the early EHR period (83%) vs paper baseline (41%) (P system implementation was associated with worsening of intraoperative nursing documentation time especially in shorter procedures. However, it is possible to implement an EHR OR management system without serious negative impacts on surgical volume and staffing requirements.

  5. Information Operations: Countering the Asymmetric Threat to the United States

    National Research Council Canada - National Science Library

    McKeown, Wendell

    1999-01-01

    .... The cornerstone of Joint Vision 2010 is information superiority. Every facet of future military operations will be critically linked to an aggregate cyber network that relies on critical national infrastructures to provide for information superiority...

  6. An Examination of the United States Air Service's Logistics Operations

    National Research Council Canada - National Science Library

    Hunt, Andrew

    1998-01-01

    This historical study details the U.S. Air Service's logistics operations at home and abroad in an attempt to determine the relationship between the process and more recently established logistic principles...

  7. 7 CFR 631.22 - Access to operating unit.

    Science.gov (United States)

    2010-01-01

    ..., DEPARTMENT OF AGRICULTURE LONG TERM CONTRACTING GREAT PLAINS CONSERVATION PROGRAM Miscellaneous § 631.22... unit for the purpose of ascertaining the accuracy of any representations made in a contract or leading up to a contract, and as to the performance of the terms and conditions of the contract. Access shall...

  8. Interim remedial measures proposed plan for the 200-ZP-1 Operable Unit, Hanford Site, Washington

    International Nuclear Information System (INIS)

    Parker, D.L.

    1993-12-01

    The purpose of this interim remedial measures (IRM) proposed plan is to present and solicit public comments on the IRM planned for the 200-ZP-1 Operable Unit at the Hanford Site in Washington state. The 200-ZP-1 is one of two operable units that envelop the groundwater beneath the 200 West Area of the Hanford Site

  9. Survey method for radiological surveys of 300 FF-1 Operable Unit soil and materials

    International Nuclear Information System (INIS)

    Greif, A.A.

    1997-06-01

    This technical basis document is to be used to survey soils at the 300-FF-1 Operable Unit during remediation of the site. Its purpose is to provide a basis for the survey methods to be employed by the Radiological Control Technician to determine if excavated areas require continued remediation in accordance with the Record of Decision for the operable unit

  10. Brunswick Steam Electric Plant, Units 1 and 2. Annual operating report for 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Net electrical energy generated by Unit 1 was 30,399 MWH with the generator on line 334.5 hrs. Unit 2 generated 2,481,014 MWH with the generator on line 4,915.53 hrs. Information is presented concerning operations, shutdowns and power reductions, maintenance, power generation, modifications, changes to operational procedures, radiation exposures, and leak rate testing

  11. Increasing the flexibility of base-load generating units in operation on fossil fuel

    Energy Technology Data Exchange (ETDEWEB)

    Girshfel' d, V Ya; Khanaev, V A; Volkova, E D; Gorelov, V A; Gershenkroi, M L

    1979-01-01

    Increasing the flexibility of base-load generating units operating on fossil fuel by modifying them is a necessary measure. The highest economic effect is attained with modification of gas- and oil-fired generating units in the Western United Power Systems of the European part of the SPSS. On the basis of available experience, 150- and 200-MW units can be extensively used to regulate the power in the European part of the SPSS through putting them into reserve for the hours of the load dip at night. The change under favorable conditions of 150- and 200-MW units operating on coal to a district-heating operating mode does not reduce the possibilities for flexible operation of these units because it is possible greatly to unload the turbines while the minimum load level of the pulverized fuel fired boiler is retained through transferring a part of the heat load to the desuperheater. It is necessary to accumulate and analyze experience with operation of generating units (especially of supercritical units) with regular shutdowns and starts of groups of units and to solve the problems of modification of generating units, with differentiation with respect to types of fuel and to the united power supply system.

  12. Concept for a Satellite-Based Advanced Air Traffic Management System : Volume 4. Operational Description and Qualitative Assessment.

    Science.gov (United States)

    1974-02-01

    The volume presents a description of how the Satellite-Based Advanced Air Traffic Management System (SAATMS) operates and a qualitative assessment of the system. The operational description includes the services, functions, and tasks performed by the...

  13. Twenty years of operation of WWER 440/230 units in Jaslovske Bohunice

    International Nuclear Information System (INIS)

    Tomek, J.

    1998-01-01

    It is twenty years this year since the first unit WWER 440 of Slovak Nuclear Power Plant Jaslovske Bohunice was commissioned. There are four units WWER 440 in operation Jaslovske Bohunice site. First two units of older soviet PWR design V-230 (also known as V-1) and other two units of newer V-213 type (also known as V-2). The goal of this presentation is to summarize and evaluate the operation of Unit 1 and 2 for this period of time and mainly to describe what has been done and what is planned to be done to increase the nuclear safety and operational reliability of both units. The operating organization and regulatory authority assume that an internationally acceptable level of safety will be reached by accomplishing of the upgrading program.(author)

  14. Calvert Cliffs Nuclear Power Plant, Units 1 and 2. Annual operating report: January--December 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Unit 1 successfully completed its first core cycle with unit availability of 95.2 percent. Saltwater leakage into the condenser continues to be a problem. Unit 2 achieved initial criticality November 30 and was initially paralleled to the Baltimore system on December 7. Information is presented concerning operations, specifications, maintenance, shutdowns and power reduction, and personnel exposures

  15. Licensed operating reactors. Status summary report data as of 12-31-94: Volume 19

    International Nuclear Information System (INIS)

    1995-04-01

    The Nuclear Regulatory Commission's annual summary of licensed nuclear power reactor data is based primarily on the report of operating data submitted by licensees for each unit for the month of December because that report contains data for the month of December, the year to date (in this case calendar year 1994) and cumulative data, usually from the date of commercial operation. The data is not independently verified, but various computer checks are made. The report is divided into two sections. The first contains summary highlights and the second contains data on each individual unit in commercial operation. Section 1 capacity and availability factors are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensee and notes as to the use of weighted averages and starting dates other than commercial operation are provided

  16. Licensed operating reactors. Status summary report data as of 12-31-94: Volume 19

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    The Nuclear Regulatory Commission`s annual summary of licensed nuclear power reactor data is based primarily on the report of operating data submitted by licensees for each unit for the month of December because that report contains data for the month of December, the year to date (in this case calendar year 1994) and cumulative data, usually from the date of commercial operation. The data is not independently verified, but various computer checks are made. The report is divided into two sections. The first contains summary highlights and the second contains data on each individual unit in commercial operation. Section 1 capacity and availability factors are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensee and notes as to the use of weighted averages and starting dates other than commercial operation are provided.

  17. Ethnomathematics study: uncovering units of length, area, and volume in Kampung Naga Society

    Science.gov (United States)

    Septianawati, T.; Turmudi; Puspita, E.

    2017-02-01

    During this time, mathematics is considered as something neutral and not associated with culture. It can be seen from mathematics learning in the school which adopt many of foreign mathematics learning are considered more advanced (western). In fact, Indonesia is a rich country in cultural diversity. In the cultural activities, there are mathematical ideas that were considered a important thing in the mathematics learning. A study that examines the idea or mathematical practices in a variety of cultural activities are known as ethnomathematics. In Indonesia, there are some ethnic maintain their ancestral traditions, one of them is Kampung Naga. Therefore, this study was conducted in Kampung Naga. This study aims to uncover units of length, area, and volume used by Kampung Naga society. This study used a qualitative approach and ethnography methods. In this research, data collection is done through the principles of ethnography such as observation, interviews, documentation, and field notes. The results of this study are units of length, area, and volume used by Kampung Naga society and its conversion into standard units. This research is expected to give information to the public that mathematics has a relationship with culture and become recommendation to mathematics curriculum in Indonesia.

  18. Operational challenges and opportunities in pastured poultry operations in the United States.

    Science.gov (United States)

    Elkhoraibi, C; Pitesky, M; Dailey, N; Niemeier, D

    2017-06-01

    As pastured poultry production has gained increased popularity in the United States in recent years, there is a growing need for research and outreach efforts aimed at this sector of poultry production. In order to get familiarized with American pastured poultry producers, we conducted an online questionnaire aimed primarily at evaluating what operational challenges are faced by producers and what educational opportunities should be initiated by researchers. Results showed that pastured poultry farms largely vary in total number of acres farmed and total number of birds kept. The vast majority of farms (96%) rotate their flocks on pasture and include livestock species (78%) in their rotation systems. Mobile coops are the preferred housing option provided by producers (88%). The most common source of mortality listed by respondents was predation (52%), followed by "other" (32%). However, predation was not selected as the most important challenge by the majority of respondents. Sixty-four percent of participants instead mentioned providing adequate feed at reasonable cost as the major challenge in raising poultry on pasture, followed again by "other" (52%) and lack of processing facilities for small numbers of birds (40%). Finally, the topics considered by respondents as the most helpful to learn more about were how to improve egg production rate and/or feed conversion ratio (67%), followed by how to improve pasture condition and optimum vegetative cover all year round (62%). Despite its small sample size, this study's results provide some valuable insights of challenges encountered and information needed on pastured poultry farms. © 2017 Poultry Science Association Inc.

  19. Pilgrim Nuclear Power Station, Unit 1. Annual operating report, 1975

    International Nuclear Information System (INIS)

    1976-01-01

    Net electric power generated in 1975 was 1,074,401 MW(e) with the generator on line 4,680.7 hrs. Information is presented concerning operations, maintenance, radioactive effluents and waste shipments, health physics, shutdowns, and personnel exposures

  20. Startup operation of Browns Ferry's 1152-MW nuclear units

    International Nuclear Information System (INIS)

    Calhoun, J.R.; Green, H.J.; Beers, R.B.

    1975-01-01

    An overview is presented of startup operation for the Browns Ferry-1 reactor, and comparisons are made with the startup of Browns Ferry-2. Included are comments on the selection of the BWR type steam supply system, reactor fueling, problems encountered, and plant availability

  1. Brunswick Steam Electric Plant, Unit 2. Annual operating report, 1975

    International Nuclear Information System (INIS)

    1976-01-01

    Initial criticality occurred in March and start-up testing continued for most of the year. Information is presented concerning operations, shutdowns, maintenance, design changes, personnel radiation exposures, thermal transients, safety/relief valve malfunctions, condenser tube leaks, and recirculation pump seal failures

  2. Pilgrim Nuclear Power Station, Unit 1. Annual operating report, 1975

    International Nuclear Information System (INIS)

    1976-01-01

    Net electrical power generated was 2,587,248 MWH(e) with the reactor on line 6,242.4 hr. Information is presented concerning operations, power generation, shutdowns, corrective maintenance, chemistry and radiochemistry, occupational radiation exposure, release of radioactive materials, and reportable occurrences

  3. Remedial investigation work plan for Bear Creek Valley Operable Unit 1 (S-3 Ponds, Boneyard/Burnyard, Oil Landfarm, Sanitary Landfill 1, and the Burial Grounds, including Oil Retention Ponds 1 and 2) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Volume 1, Main text

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-01

    The intent and scope of the work plan are to assemble all data necessary to facilitate selection of remediation alternatives for the sites in Bear Creek Valley Operable Unit 1 (BCV OU 1) such that the risk to human health and the environment is reduced to acceptable levels based on agreements with regulators. The ultimate goal is to develop a final Record Of Decision (ROD) for all of the OUs in BCV, including the integrator OU. However, the initial aim of the source OUs is to develop a ROD for interim measures. For source OUs such as BCV OU 1, data acquisition will not be carried out in a single event, but will be carried out in three stages that accommodate the schedule for developing a ROD for interim measures and the final site-wide ROD. The three stages are as follows: Stage 1, Assemble sufficient data to support decisions such as the need for removal actions, whether to continue with the remedial investigation (RI) process, or whether no further action is required. If the decision is made to continue the RI/FS process, then: Stage 2, Assemble sufficient data to allow for a ROD for interim measures that reduce risks to the human health and the environment. Stage 3, Provide input from the source OU that allows a final ROD to be issued for all OUs in the BCV hydrologic regime. One goal of the RI work plan will be to ensure that sampling operations required for the initial stage are not repeated at later stages. The overall goals of this RI are to define the nature and extent of contamination so that the impact of leachate, surface water runoff, and sediment from the OU I sites on the integrator OU can be evaluated, the risk to human health and the environment can be defined, and the general physical characteristics of the subsurface can be determined such that remedial alternatives can be screened.

  4. Licensed operating reactors. Status summary report data as of March 31, 1986. Volume 10, No. 4

    International Nuclear Information System (INIS)

    1986-05-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Resource Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. Since all of the data concerning operation of the units is provided by the utility operators less than two weeks after the end of the month, necessary corrections to published information are shown on the ERRATA page. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States. The percentage computations, Items 20 through 24 in Section 2, the vendor capacity factors on page 1-7, and actual vs potential energy production on page 1-2 are computed using actual data for the period of consideration. The percentages listed in power generation on page 1-2 are computed as a arithmetic average. The factors for the life-span of each unit (the ''Cumulative'' column) are reported by the utility and are not entirely recomputed by NRC. Utility power production data is checked for consistency with previously submitted statistics. It is hoped this status report proves informative and helpful to all agencies and individuals interested in analyzing trends in the nuclear industry which might have safety implications, or in maintaining an awareness of the US energy situation as a whole

  5. Licensed operating reactors. Status summary report, data as of October 31, 1985. Volume 9, No. 11

    International Nuclear Information System (INIS)

    1985-12-01

    The US Nuclear Regulatory Commission's monthly Licensed Operating Reactors Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Resource Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. Since all of the data concerning operation of the units is provided by the utility operators less than two weeks after the end of the month, necessary corrections to published information are shown on the errata page. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States. The percentage computations, Items 20 through 24 in Section 2, the vendor capacity factors on page 1-7, and actual vs potential energy production on page 1-2 are computed using actual data for the period of consideration. The percentages listed in power generation on page 1-2 are computed as an arithmetic average. The factors for the life-span of each unit (the ''Cumulative'' column) are reported by the utility and are not entirely re-computed by NRC. Utility power production data is checked for consistency with previously submitted statistics

  6. Simulation model for wind energy storage systems. Volume II. Operation manual. [SIMWEST code

    Energy Technology Data Exchange (ETDEWEB)

    Warren, A.W.; Edsinger, R.W.; Burroughs, J.D.

    1977-08-01

    The effort developed a comprehensive computer program for the modeling of wind energy/storage systems utilizing any combination of five types of storage (pumped hydro, battery, thermal, flywheel and pneumatic). An acronym for the program is SIMWEST (Simulation Model for Wind Energy Storage). The level of detail of SIMWEST is consistent with a role of evaluating the economic feasibility as well as the general performance of wind energy systems. The software package consists of two basic programs and a library of system, environmental, and load components. Volume II, the SIMWEST operation manual, describes the usage of the SIMWEST program, the design of the library components, and a number of simple example simulations intended to familiarize the user with the program's operation. Volume II also contains a listing of each SIMWEST library subroutine.

  7. Characteristics and Energy Use of Volume Servers in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Fuchs, H. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Shehabi, A. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Ganeshalingam, M. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Desroches, L. -B. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Lim, B. [Fraunhofer Center for Sustainable Energy Systems, Boston, MA (United States); Roth, K. [Fraunhofer Center for Sustainable Energy Systems, Boston, MA (United States); Tsao, A. [Navigant Consulting Inc., Chicago, IL (United States)

    2017-11-01

    Servers’ field energy use remains poorly understood, given heterogeneous computing loads, configurable hardware and software, and operation over a wide range of management practices. This paper explores various characteristics of 1- and 2-socket volume servers that affect energy consumption, and quantifies the difference in power demand between higher-performing SPEC and ENERGY STAR servers and our best understanding of a typical server operating today. We first establish general characteristics of the U.S. installed base of volume servers from existing IDC data and the literature, before presenting information on server hardware configurations from data collection events at a major online retail website. We then compare cumulative distribution functions of server idle power across three separate datasets and explain the differences between them via examination of the hardware characteristics to which power draw is most sensitive. We find that idle server power demand is significantly higher than ENERGY STAR benchmarks and the industry-released energy use documented in SPEC, and that SPEC server configurations—and likely the associated power-scaling trends—are atypical of volume servers. Next, we examine recent trends in server power draw among high-performing servers across their full load range to consider how representative these trends are of all volume servers before inputting weighted average idle power load values into a recently published model of national server energy use. Finally, we present results from two surveys of IT managers (n=216) and IT vendors (n=178) that illustrate the prevalence of more-efficient equipment and operational practices in server rooms and closets; these findings highlight opportunities to improve the energy efficiency of the U.S. server stock.

  8. Exact finite volume expectation values of local operators in excited states

    Energy Technology Data Exchange (ETDEWEB)

    Pozsgay, B. [MTA-BME “Momentum” Statistical Field Theory Research Group,Budafoki út 8, 1111 Budapest (Hungary); Szécsényi, I.M. [Department of Mathematical Sciences, Durham University, South Road, Durham, DH1 3LE (United Kingdom); Institute of Theoretical Physics, Eötvös Loránd University,Pázmány Péter sétány 1/A, 1117 Budapest (Hungary); Takács, G. [MTA-BME “Momentum” Statistical Field Theory Research Group,Budafoki út 8, 1111 Budapest (Hungary); Department of Theoretical Physics, Budapest University of Technology and Economics,Budafoki út 8, 1111 Budapest (Hungary)

    2015-04-07

    We present a conjecture for the exact expression of finite volume expectation values in excited states in integrable quantum field theories, which is an extension of an earlier conjecture to the case of general diagonal factorized scattering with bound states and a nontrivial bootstrap structure. The conjectured expression is a spectral expansion which uses the exact form factors and the excited state thermodynamic Bethe Ansatz as building blocks. The conjecture is proven for the case of the trace of the energy-moment tensor. Concerning its validity for more general operators, we provide numerical evidence using the truncated conformal space approach. It is found that the expansion fails to be well-defined for small values of the volume in cases when the singularity structure of the TBA equations undergoes a non-trivial rearrangement under some critical value of the volume. Despite these shortcomings, the conjectured expression is expected to be valid for all volumes for most of the excited states, and as an expansion above the critical volume for the rest.

  9. Finite-volume effects due to spatially non-local operators arXiv

    CERN Document Server

    Briceño, Raúl A.; Hansen, Maxwell T.; Monahan, Christopher J.

    Spatially non-local matrix elements are useful lattice-QCD observables in a variety of contexts, for example in determining hadron structure. To quote credible estimates of the systematic uncertainties in these calculations, one must understand, among other things, the size of the finite-volume effects when such matrix elements are extracted from numerical lattice calculations. In this work, we estimate finite-volume effects for matrix elements of non-local operators, composed of two currents displaced in a spatial direction by a distance $\\xi$. We find that the finite-volume corrections depend on the details of the matrix element. If the external state is the lightest degree of freedom in the theory, e.g.~the pion in QCD, then the volume corrections scale as $ e^{-m_\\pi (L- \\xi)} $, where $m_\\pi$ is the mass of the light state. For heavier external states the usual $e^{- m_\\pi L}$ form is recovered, but with a polynomial prefactor of the form $L^m/|L - \\xi|^n$ that can lead to enhanced volume effects. These ...

  10. Exact finite volume expectation values of local operators in excited states

    International Nuclear Information System (INIS)

    Pozsgay, B.; Szécsényi, I.M.; Takács, G.

    2015-01-01

    We present a conjecture for the exact expression of finite volume expectation values in excited states in integrable quantum field theories, which is an extension of an earlier conjecture to the case of general diagonal factorized scattering with bound states and a nontrivial bootstrap structure. The conjectured expression is a spectral expansion which uses the exact form factors and the excited state thermodynamic Bethe Ansatz as building blocks. The conjecture is proven for the case of the trace of the energy-moment tensor. Concerning its validity for more general operators, we provide numerical evidence using the truncated conformal space approach. It is found that the expansion fails to be well-defined for small values of the volume in cases when the singularity structure of the TBA equations undergoes a non-trivial rearrangement under some critical value of the volume. Despite these shortcomings, the conjectured expression is expected to be valid for all volumes for most of the excited states, and as an expansion above the critical volume for the rest.

  11. Solid Waste Operations Complex W-113: Project cost estimate. Preliminary design report. Volume IV

    International Nuclear Information System (INIS)

    1995-01-01

    This document contains Volume IV of the Preliminary Design Report for the Solid Waste Operations Complex W-113 which is the Project Cost Estimate and construction schedule. The estimate was developed based upon Title 1 material take-offs, budgetary equipment quotes and Raytheon historical in-house data. The W-113 project cost estimate and project construction schedule were integrated together to provide a resource loaded project network

  12. Subsurface Interim Measures/Interim Remedial Action Plan/ Environmental Assessment and Decision Document, Operable Unit No. 2

    International Nuclear Information System (INIS)

    1992-01-01

    The subject Interim Measures/Interim Remedial Action plan/Environmental Assessment (IM/IRAP/EA) addresses residual free-phase volatile organic compound (VOC) contamination suspected in the subsurface within an area identified as Operable Unit No. 2 (OU2). This IM/IRAP/EA also addresses radionuclide contamination beneath the 903 Pad at OU2. Although subsurface VOC and radionuclide contamination on represent a source of OU2 ground-water contamination, they pose no immediate threat to public health or the environment. This volume contains five appendices

  13. Cognitive model of the power unit operator activity

    International Nuclear Information System (INIS)

    Chachko, S.A.

    1992-01-01

    Basic notions making it possible to study and simulate the peculiarities of man-operator activity, in particular his way of thiking, are considered. Special attention is paid to cognitive models based on concept of decisive role of knowledge (its acquisition, storage and application) in the man mental processes and activity. The models are based on three basic notions, which are the professional world image, activity strategy and spontaneous decisions

  14. Operations Research and the US (United States) Army

    Science.gov (United States)

    1983-04-07

    technology "developed more rapidly than it could be absorbed effectively into military tactics and strategy." 4 World War II is usually identified as...Corporation, was formed by the Air Force as a non-profit organization to provide technological advice. 7 By the early 1950’s the public recognized operations... enlight - ening. He recognized the important and clearly distinguishable roles played by the technical analyst and the military decision maker. The systems

  15. Cost and Operational Effectiveness Analysis of Aiternative Force Structures for Fulfillment of the United States Marine Corps Operational Support Airlift and Search and Rescue Missions

    National Research Council Canada - National Science Library

    Chase, Eric

    2000-01-01

    This thesis provides a preliminary cost and operational effectiveness analysis of alternative force structures for the United States Marine Corps operational support airlift and search and rescue missions...

  16. Experimental determinations of the turbine condenser operation at Cernavoda NPP Unit 1

    International Nuclear Information System (INIS)

    Romascu, Gabriel; Dragusin, Dumitru; Rogociu, Ioan; Macodean, Luminita; Marciulescu, George

    1999-01-01

    The condenser system represents one of the most important BOP (balance of plant) systems of the CANDU 700 MW Unit at Cernavoda NPP. The paper presents theoretical calculation elements, mathematical model for simulation of condenser operation and the results obtained by model implementation as compared to operation data. The model could be adapted to other turbine and operation regime types. (authors)

  17. 14 CFR 375.41 - Agricultural and industrial operations within the United States.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Agricultural and industrial operations... Agricultural and industrial operations within the United States. Foreign civil aircraft shall not be used for such commercial air operations as crop dusting, pest control, pipeline patrol, mapping, surveying...

  18. Biota of the 300-FF-1 operable unit. [Westinghouse Hanford Company

    Energy Technology Data Exchange (ETDEWEB)

    Rickard, W.H. Jr.; Fitzner, R.E.; Brandt, C.A.

    1990-10-01

    This report summarizes Task 5a-2 of the Phase I Remedial Investigation -- Operable Unit Characterization of the 300-FF-1 Operable Unit on the Hanford Site, near Richland, Washington. The ultimate goal of Phase I is to determine the nature and extent of the threat to public health and the environment from releases of hazardous substances from the operable unit. The purpose of Task 5a-2 was to determine what species inhabit the 300-FF-1 Operable Unit and how they use the unit. The focus is on those species listed as endangered or threatened, those that are economically important, or those that constitute significant components of the human food chain. 39 refs., 5 figs., 5 tabs.

  19. Radioprotection in the operation of accelerator and plasma units

    International Nuclear Information System (INIS)

    Ewen, K.

    1984-01-01

    Relatively great problems of radioprotection can be caused by accelerator units, above all in the field of science, because all kinds of ionizing radiation and radioactive substances can be produced in all stages of aggregation. Furthermore, activities with relatively long half-lifes are induced by high particle streams with energies beyond the thresholds of many nuclear reations, to that the conditions of a control zone, even of a prohibited zone exist at many points after having switched off the accelerator. Not all of these radioprotective problems can be solved by constructive or technical measures. A sufficient skill of the persons responsible for radioprotection is very important in this connection. Efficient radioprotective measures are only possible by a close cooperation between the radiation protection officer, the competent authority, and the expert. (orig.) [de

  20. United Kingdom: Procurement Related Nuclear Experience (Operating Experience)

    International Nuclear Information System (INIS)

    2016-01-01

    Procurement of nuclear facilities in the United Kingdom is subject to nuclear site licence conditions issued by the Government through the Office for Nuclear Regulation (ONR). Each nuclear facility in the United Kingdom must have a nuclear site licence and must comply with the 36 general conditions that are set out in the Licence Condition Handbook (October 2014). In addition, the ONR has published a technical assessment guide for the procurement of nuclear safety related items or services; a guide on intelligent customers and a guide on records management also apply to the procurement phase, and ONR interventions look across all three of these documents. Procurement governance arrangements need to be developed (including a policy, manual, procedures and template documents) and approved within the utility company. The ONR monitors the arrangements via interventions and deems the arrangements to be ‘adequate’. Some procurement contracts become lifetime records for nuclear safety related systems and need to be retained while the plant is in place. A formal record retention schedule needs to be created and managed by the procurement organization. The utility company may elect to set hold points during the various procurement stages and, importantly, obtain approval for the contract and its content from all technical stakeholders (with particular emphasis on the engineering, project management and design authority quality functions before contract award). For contracts with high nuclear safety significance, the ONR may enforce additional hold points before and/or after contract award. There is a general requirement that the utility puts in place adequate arrangements to ensure that suitably qualified and experienced personnel are employed to implement adequate management arrangements and to act as an intelligent customer. This includes being able to demonstrate that any contractor or supplier is suitable, capable and experienced, and has the necessary processes and

  1. Ground Operations Demonstration Unit for Liquid Hydrogen Initial Test Results

    Science.gov (United States)

    Notardonato, W. U.; Johnson, W. L.; Swanger, A. M.; Tomsik, T.

    2015-01-01

    NASA operations for handling cryogens in ground support equipment have not changed substantially in 50 years, despite major technology advances in the field of cryogenics. NASA loses approximately 50% of the hydrogen purchased because of a continuous heat leak into ground and flight vessels, transient chill down of warm cryogenic equipment, liquid bleeds, and vent losses. NASA Kennedy Space Center (KSC) needs to develop energy-efficient cryogenic ground systems to minimize propellant losses, simplify operations, and reduce cost associated with hydrogen usage. The GODU LH2 project has designed, assembled, and started testing of a prototype storage and distribution system for liquid hydrogen that represents an advanced end-to-end cryogenic propellant system for a ground launch complex. The project has multiple objectives including zero loss storage and transfer, liquefaction of gaseous hydrogen, and densification of liquid hydrogen. The system is unique because it uses an integrated refrigeration and storage system (IRAS) to control the state of the fluid. This paper will present and discuss the results of the initial phase of testing of the GODU LH2 system.

  2. Standard formatted data units-control authority operations

    Science.gov (United States)

    1991-01-01

    The purpose of this document is to illustrate a Control Authority's (CA) possible operation. The document is an interpretation and expansion of the concept found in the CA Procedures Recommendation. The CA is described in terms of the functions it performs for the management and control of data descriptions (metadata). Functions pertaining to the organization of Member Agency Control Authority Offices (MACAOs) (e.g., creating and disbanding) are not discussed. The document also provides an illustrative operational view of a CA through scenarios describing interaction between those roles involved in collecting, controlling, and accessing registered metadata. The roles interacting with the CA are identified by their actions in requesting and responding to requests for metadata, and by the type of information exchanged. The scenarios and examples presented in this document are illustrative only. They represent possible interactions supported by either a manual or automated system. These scenarios identify requirements for an automated system. These requirements are expressed by identifying the information to be exchanged and the services that may be provided by a CA for that exchange.

  3. Licensed operating reactors. Status summary report, data as of September 30, 1984. Volume 8, No. 10

    International Nuclear Information System (INIS)

    1984-11-01

    This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States. The percentage computations, Items 20 through 24 in Section 2, the vendor capacity factors, and actual vs. potential energy production are computed using actual data for the period of consideration. The percentages listed in power generation are computed as an arithmetic average. The factors for the life-span of each unit (the Cumulative column) are reported by the utility. Utility power production data is checked for consistency with previously submitted statistics

  4. Preparation status for continuous operation of Kori unit 1 NPP in Korea

    International Nuclear Information System (INIS)

    Choi, C.H. . E-mail : chechee@khnp.co.kr

    2005-01-01

    Kori unit 1 Nuclear Power Plant is the first commercial operation plant in Korea. In Korea, the life extension of NPP beyond design lifetime reached practically application stage. Preparations status for continuous operation of Kori unit 1, Many researches have demonstrated that life extension beyond design lifetime is possible in terms of technology. This paper is to introduce and to share the continuous operation preparations status and schedule for Kori unit 1 License Renewal Process an additional every 10 years beyond the design life 30 years term. (author)

  5. Solid Waste Operations Complex W-113, Detail Design Report (Title II). Volume 3: Specifications

    International Nuclear Information System (INIS)

    1995-09-01

    The Solid Waste Retrieval Facility--Phase 1 (Project W113) will provide the infrastructure and the facility required to retrieve from Trench 04, Burial ground 4C, contact handled (CH) drums and boxes at a rate that supports all retrieved TRU waste batching, treatment, storage, and disposal plans. This includes (1) operations related equipment and facilities, viz., a weather enclosure for the trench, retrieval equipment, weighing, venting, obtaining gas samples, overpacking, NDE, NDA, shipment of waste and (2) operations support related facilities, viz., a general office building, a retrieval staff change facility, and infrastructure upgrades such as supply and routing of water, sewer, electrical power, fire protection, roads, and telecommunication. Title I design for the operations related equipment and facilities was performed by Raytheon/BNFL, and that for the operations support related facilities including infrastructure upgrade was performed by KEH. These two scopes were combined into an integrated W113 Title II scope that was performed by Raytheon/BNFL. Volume 3 is a compilation of the construction specifications that will constitute the Title II materials and performance specifications. This volume contains CSI specifications for non-equipment related construction material type items, performance type items, and facility mechanical equipment items. Data sheets are provided, as necessary, which specify the equipment overall design parameters

  6. Construction and operation of the Spallation Neutron Source: Draft environmental impact statement. Volume 2

    International Nuclear Information System (INIS)

    1998-12-01

    DOE proposes to construct and operate a state-of-the-art, short-pulsed spallation neutron source comprised of an ion source, a linear accelerator, a proton accumulator ring, and an experiment building containing a liquid mercury target and a suite of neutron scattering instrumentation. The proposed Spallation Neutron Source would be designed to operate at a proton beam power of 1 megawatt. The design would accommodate future upgrades to a peak operating power of 4 megawatts. These upgrades may include construction of a second proton accumulation ring and a second target. Volume 1 of this document analyzes the potential environmental impacts from the proposed action and the alternatives. The analysis assumes a facility operating at a power of 1 MW and 4 MW over the life of the facility. The two primary alternatives analyzed in this EIS are: the proposed action (to proceed with building the Spallation Neutron Source) and the No-Action Alternative. This volume contains the following appendices: (A) SNS accident source terms for EIS input; (B) Reports on the selection of alternative sites for the SNS; (C) Letters of consultation on protected species and cultural resources; (D) Ecological resource survey reports and summaries; (E) Descriptions of ORNL research projects in the Walker Branch Watershed; (F) Atmospheric dispersion and dose calculations for normal and accident conditions; (G) Projected air quality modeling effects at NOAA's Walker Branch Monitoring Tower

  7. Solid Waste Operations Complex W-113, Detail Design Report (Title II). Volume 3: Specifications

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    The Solid Waste Retrieval Facility--Phase 1 (Project W113) will provide the infrastructure and the facility required to retrieve from Trench 04, Burial ground 4C, contact handled (CH) drums and boxes at a rate that supports all retrieved TRU waste batching, treatment, storage, and disposal plans. This includes (1) operations related equipment and facilities, viz., a weather enclosure for the trench, retrieval equipment, weighing, venting, obtaining gas samples, overpacking, NDE, NDA, shipment of waste and (2) operations support related facilities, viz., a general office building, a retrieval staff change facility, and infrastructure upgrades such as supply and routing of water, sewer, electrical power, fire protection, roads, and telecommunication. Title I design for the operations related equipment and facilities was performed by Raytheon/BNFL, and that for the operations support related facilities including infrastructure upgrade was performed by KEH. These two scopes were combined into an integrated W113 Title II scope that was performed by Raytheon/BNFL. Volume 3 is a compilation of the construction specifications that will constitute the Title II materials and performance specifications. This volume contains CSI specifications for non-equipment related construction material type items, performance type items, and facility mechanical equipment items. Data sheets are provided, as necessary, which specify the equipment overall design parameters.

  8. Hospital markup and operation outcomes in the United States.

    Science.gov (United States)

    Gani, Faiz; Ejaz, Aslam; Makary, Martin A; Pawlik, Timothy M

    2016-07-01

    Although the price hospitals charge for operations has broad financial implications, hospital pricing is not subject to regulation. We sought to characterize national variation in hospital price markup for major cardiothoracic and gastrointestinal operations and to evaluate perioperative outcomes of hospitals relative to hospital price markup. All hospitals in which a patient underwent a cardiothoracic or gastrointestinal procedure were identified using the Nationwide Inpatient Sample for 2012. Markup ratios (ratio of charges to costs) for the total cost of hospitalization were compared across hospitals. Risk-adjusted morbidity, failure-to-rescue, and mortality were calculated using multivariable, hierarchical logistic regression. Among the 3,498 hospitals identified, markup ratios ranged from 0.5-12.2, with a median markup ratio of 2.8 (interquartile range 2.7-3.9). For the 888 hospitals with extreme markup (greatest markup ratio quartile: markup ratio >3.9), the median markup ratio was 4.9 (interquartile range 4.3-6.0), with 10% of these hospitals billing more than 7 times the Medicare-allowable costs (markup ratio ≥7.25). Extreme markup hospitals were more often large (46.3% vs 33.8%, P markup ratio compared with 19.3% (n = 452) and 6.8% (n = 35) of nonprofit and government hospitals, respectively. Perioperative morbidity (32.7% vs 26.4%, P markup hospitals. There is wide variation in hospital markup for cardiothoracic and gastrointestinal procedures, with approximately a quarter of hospital charges being 4 times greater than the actual cost of hospitalization. Hospitals with an extreme markup had greater perioperative morbidity. Copyright © 2016 Elsevier Inc. All rights reserved.

  9. The chemical energy unit partial oxidation reactor operation simulation modeling

    Science.gov (United States)

    Mrakin, A. N.; Selivanov, A. A.; Batrakov, P. A.; Sotnikov, D. G.

    2018-01-01

    The chemical energy unit scheme for synthesis gas, electric and heat energy production which is possible to be used both for the chemical industry on-site facilities and under field conditions is represented in the paper. The partial oxidation reactor gasification process mathematical model is described and reaction products composition and temperature determining algorithm flow diagram is shown. The developed software product verification showed good convergence of the experimental values and calculations according to the other programmes: the temperature determining relative discrepancy amounted from 4 to 5 %, while the absolute composition discrepancy ranged from 1 to 3%. The synthesis gas composition was found out practically not to depend on the supplied into the partial oxidation reactor (POR) water vapour enthalpy and compressor air pressure increase ratio. Moreover, air consumption coefficient α increase from 0.7 to 0.9 was found out to decrease synthesis gas target components (carbon and hydrogen oxides) specific yield by nearly 2 times and synthesis gas target components required ratio was revealed to be seen in the water vapour specific consumption area (from 5 to 6 kg/kg of fuel).

  10. Expiratory flow limitation and operating lung volumes during exercise in older and younger adults.

    Science.gov (United States)

    Smith, Joshua R; Kurti, Stephanie P; Meskimen, Kayla; Harms, Craig A

    2017-06-01

    We determined the effect of aging on expiratory flow limitation (EFL) and operating lung volumes when matched for lung size. We hypothesized that older adults will exhibit greater EFL and increases in EELV during exercise compared to younger controls. Ten older (5M/5W; >60years old) and nineteen height-matched young adults (10M/9W) were recruited. Young adults were matched for%predicted forced vital capacity (FVC) (Y-matched%Pred FVC; n=10) and absolute FVC (Y-matched FVC; n=10). Tidal flow-volume loops were recorded during the incremental exercise test with maximal flow-volume loops measured pre- and post-exercise. Compared to younger controls, older adults exhibited more EFL at ventilations of 26, 35, 51, and 80L/min. The older group had higher end-inspiratory lung volume compared to Y-matched%Pred FVC group during submaximal ventilations. The older group increased EELV during exercise, while EELV stayed below resting in the Y-matched%Pred FVC group. These data suggest older adults exhibit more EFL and increase EELV earlier during exercise compared to younger adults. Copyright © 2017 Elsevier B.V. All rights reserved.

  11. Nurse managers' decision-making in daily unit operation in peri-operative settings: a cross-sectional descriptive study.

    Science.gov (United States)

    Siirala, Eriikka; Peltonen, Laura-Maria; Lundgrén-Laine, Heljä; Salanterä, Sanna; Junttila, Kristiina

    2016-09-01

    To describe the tactical and the operational decisions made by nurse managers when managing the daily unit operation in peri-operative settings. Management is challenging as situations change rapidly and decisions are constantly made. Understanding decision-making in this complex environment helps to develop decision support systems to support nurse managers' operative and tactical decision-making. Descriptive cross-sectional design. Data were collected from 20 nurse managers with the think-aloud method during the busiest working hours and analysed using thematic content analysis. Nurse managers made over 700 decisions; either ad hoc (n = 289), near future (n = 268) or long-term (n = 187) by nature. Decisions were often made simultaneously with many interruptions. Ad hoc decisions covered staff allocation, ensuring adequate staff, rescheduling surgical procedures, confirmation tangible resources and following-up the daily unit operation. Decisions in the near future were: planning of surgical procedures and tangible resources, and planning staff allocation. Long-term decisions were: human recourses, nursing development, supplies and equipment, and finances in the unit. Decision-making was vulnerable to interruptions, which sometimes complicated the managing tasks. The results can be used when planning decision support systems and when defining the nurse managers' tasks in peri-operative settings. © 2016 John Wiley & Sons Ltd.

  12. Flight Technical Error Analysis of the SATS Higher Volume Operations Simulation and Flight Experiments

    Science.gov (United States)

    Williams, Daniel M.; Consiglio, Maria C.; Murdoch, Jennifer L.; Adams, Catherine H.

    2005-01-01

    This paper provides an analysis of Flight Technical Error (FTE) from recent SATS experiments, called the Higher Volume Operations (HVO) Simulation and Flight experiments, which NASA conducted to determine pilot acceptability of the HVO concept for normal operating conditions. Reported are FTE results from simulation and flight experiment data indicating the SATS HVO concept is viable and acceptable to low-time instrument rated pilots when compared with today s system (baseline). Described is the comparative FTE analysis of lateral, vertical, and airspeed deviations from the baseline and SATS HVO experimental flight procedures. Based on FTE analysis, all evaluation subjects, low-time instrument-rated pilots, flew the HVO procedures safely and proficiently in comparison to today s system. In all cases, the results of the flight experiment validated the results of the simulation experiment and confirm the utility of the simulation platform for comparative Human in the Loop (HITL) studies of SATS HVO and Baseline operations.

  13. Female Participation in Formed Police Units: A Report on the Integration of Women in Formed Police Units of Peacekeeping Operations

    Science.gov (United States)

    2012-09-01

    of Peacekeeping Operations in accor- dance with the principles of United Nations (UN) Res- olution 1325. To address this topic the study (1) briefly...that the eligibility criteria was revised to include women who played support roles to the combatants, as cooks, por- ters, sex slaves or spies

  14. Multi-unit Operations in Non-Nuclear Systems: Lessons Learned for Small Modular Reactors

    Energy Technology Data Exchange (ETDEWEB)

    OHara J. M.; Higgins, J.; DAgostino, A.

    2012-01-17

    The nuclear-power community has reached the stage of proposing advanced reactor designs to support power generation for decades to come. Small modular reactors (SMRs) are one approach to meet these energy needs. While the power output of individual reactor modules is relatively small, they can be grouped to produce reactor sites with different outputs. Also, they can be designed to generate hydrogen, or to process heat. Many characteristics of SMRs are quite different from those of current plants and may be operated quite differently. One difference is that multiple units may be operated by a single crew (or a single operator) from one control room. The U.S. Nuclear Regulatory Commission (NRC) is examining the human factors engineering (HFE) aspects of SMRs to support licensing reviews. While we reviewed information on SMR designs to obtain information, the designs are not completed and all of the design and operational information is not yet available. Nor is there information on multi-unit operations as envisioned for SMRs available in operating experience. Thus, to gain a better understanding of multi-unit operations we sought the lesson learned from non-nuclear systems that have experience in multi-unit operations, specifically refineries, unmanned aerial vehicles and tele-intensive care units. In this paper we report the lessons learned from these systems and the implications for SMRs.

  15. Analysis of Fukushima unit 2 accident considering the operating conditions of RCIC system

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Sung Il, E-mail: sikim@kaeri.re.kr; Park, Jong Hwa; Ha, Kwang Soon; Cho, Song-Won; Song, JinHo

    2016-03-15

    Highlights: • Fukushima unit 2 accident was analyzed using MELCOR 1.8.6. • RCIC operating conditions were assumed and best case was selected. • Effect of RCIC operating condition on accident scenario was found. - Abstract: A severe accident in Fukushima occurred on March 11, 2011 and units 1, 2 and 3 were damaged severely. A tsunami following an earthquake made the supply of electricity power stop, and the safety systems, which use AC or DC power in plants could not operate properly. It is supposed that the degree of core degradation of unit 2 is less serious than in the other plants, and it was estimated that the operation of reactor core isolation cooling (RCIC) system at the initial stage of the accident minimized the core damage through decay heat removal. Although the operating conditions of the RCIC system are not known clearly, it can be important to analyze the accident scenario of unit 2. In this study, best case of the Fukushima unit 2 accident was presented considering the operating conditions of the RCIC system. The effects of operating condition on core degradation and fission product release rate to environment were also examined. In addition, importance of torus room flooding level in the accident analysis was discussed. MELCOR 1.8.6 was used in this research, and the geometries of plant and operating conditions of safety system were obtained from TEPCO through OECD/NEA BSAF Project.

  16. Explicit isospectral flows for the AKNS operator on the unit interval

    International Nuclear Information System (INIS)

    Amour, L

    2009-01-01

    We consider the AKNS operator on the unit interval. The boundary conditions are self-adjoint separated boundary conditions. For fixed boundary conditions, we make the formulae for flows induced by general tangent vector fields on isospectral sets explicit

  17. Analysis of the Vertical Takeoff and Landing Unmanned Aerial Vehicle (VTUAV) in Small Unit Urban Operations

    National Research Council Canada - National Science Library

    Cason, Roman

    2004-01-01

    ...) to replace the aging Pioneer Unmanned Aerial Vehicle (UAV) system. This thesis examines the critical elements this platform must possess to effectively support small units operating in urban environments...

  18. Start-up and commercial operation of the Laguna Verde power plants, unit 1

    International Nuclear Information System (INIS)

    Torres R, J.F.

    1991-01-01

    The main features of the unit 1 of the Laguna Verde Power Plant is presented as well as the phases of the start-up process. The process includes various steps and tests up to start the commercial operation. (author)

  19. Description of work for 100-DR-2 Operable Unit Vadose Drilling/test pits

    International Nuclear Information System (INIS)

    Naiknimbalkar, N.

    1993-01-01

    This report describes the scope of work for the boreholes/test pits of the 100-DR-2 Operable Unit. Sampling and field activities include: Soil screening; geologic sampling; soil sampling (physical property); analytical sampling and depths; and geophysical logging

  20. Pilgrim Nuclear Power Station, Unit 1. Annual operating report for 1976

    International Nuclear Information System (INIS)

    Net electrical power generated was 2,415,511 MWH with the generator on line 5,333.6 hrs. Information is presented concerning operations, procedure changes, tests, experiments, maintenance, unit shutdowns and power reductions, and radiation doses to personnel

  1. Proposed plan for remedial action at the quarry residuals operable unit of the Weldon Spring Site

    International Nuclear Information System (INIS)

    1998-03-01

    This proposed plan addresses the management of contamination present in various components of the quarry residuals operable unit (QROU) of the Weldon Spring site, which is located in St. Charles County, Missouri. The QROU consists of (1) residual waste at the quarry proper; (2) the Femme Osage Slough, Little Femme Osage Creek, and Femme Osage Creek; and (3) quarry groundwater located primarily north of the slough. Potential impacts to the St. Charles County well field downgradient of the quarry area are also being addressed as part of the evaluations for this operable unit. Remedial activities for the QROU will be conducted by the US Department of Energy (DOE) in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended. As part of the remedial investigation/feasibility study (RI/FS) process required for the QROU under CERCLA, three major evaluation documents have been prepared to support cleanup decisions for this operable unit. decisions for this operable unit

  2. Salem Nuclear Generating Station, Unit 1. Annual operating report for 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Initial reactor criticality was achieved 12/11/76 and power generation began 12/25/76. Information is presented concerning operation, maintenance, procedure and specification changes, power generation, unit shutdowns and forced power reductions, testing, and personnel radiation exposures

  3. The US Air Force Aerial Spray Unit: a history of large area disease vector control operations, WWII through Katrina.

    Science.gov (United States)

    Breidenbaugh, Mark; Haagsma, Karl

    2008-01-01

    The US Air Force has had a long history of aerial applications of pesticides to fulfill a variety of missions, the most important being the protection of troops through the minimization of arthropod vectors capable of disease transmission. Beginning in World War II, aerial application of pesticides by the military has effectively controlled vector and nuisance pest populations in a variety of environments. Currently, the military aerial spray capability resides in the US Air Force Reserve (USAFR), which operates and maintains C-130 airplanes capable of a variety of missions, including ultra low volume applications for vector and nuisance pests, as well as higher volume aerial applications of herbicides and oil-spill dispersants. The USAFR aerial spray assets are the only such fixed-wing aerial spray assets within the Department of Defense. In addition to troop protection, the USAFR Aerial Spray Unit has participated in a number of humanitarian/relief missions, most recently in the response to the 2005 Hurricanes Katrina and Rita, which heavily damaged the Gulf Coasts of Louisiana, Mississippi, and Texas. This article provides historical background on the Air Force Aerial Spray Unit and describes the operations in Louisiana in the aftermath of Hurricane Katrina.

  4. Record of Decision for the Ford Building Waste Unit (643-11G) Operable Unit; FINAL

    International Nuclear Information System (INIS)

    Fraley, S.

    2002-01-01

    This decision document presents the selected remedial for the Ford Building Waste Unit (FBWU), in Aiken, South Carolina, which was chosen in accordance with CERCLA, as amended by SARA, and, to the extent practical, the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). This decision is based on the Administrative Record File for this specific RCRA/CERCLA site

  5. An operating nuclear utility's experience with the ALARA design of a new nuclear unit

    International Nuclear Information System (INIS)

    Rodgers, R.C.

    1985-01-01

    This talk presents a review of how operating experience at Northeast Utilities has been factored into the design of a new nuclear unit and the development and management of the radiation protection program. Their operational experience has indicated that there are two facets to keeping radiation exposures ALARA. The first is the proper ALARA design of the unit. The other facet is the design of a comprehensive radiation protection program. The author discusses these facets in some detail

  6. Replacement energy costs for nuclear electricity-generating units in the United States: 1997--2001. Volume 4

    International Nuclear Information System (INIS)

    VanKuiken, J.C.; Guziel, K.A.; Tompkins, M.M.; Buehring, W.A.

    1997-09-01

    This report updates previous estimates of replacement energy costs for potential short-term shutdowns of 109 US nuclear electricity-generating units. This information was developed to assist the US Nuclear Regulatory Commission (NRC) in its regulatory impact analyses, specifically those that examine the impacts of proposed regulations requiring retrofitting of or safety modifications to nuclear reactors. Such actions might necessitate shutdowns of nuclear power plants while these changes are being implemented. The change in energy cost represents one factor that the NRC must consider when deciding to require a particular modification. Cost estimates were derived from probabilistic production cost simulations of pooled utility system operations. Factors affecting replacement energy costs, such as random unit failures, maintenance and refueling requirements, and load variations, are treated in the analysis. This report describes an abbreviated analytical approach as it was adopted to update the cost estimates published in NUREG/CR-4012, Vol. 3. The updates were made to extend the time frame of cost estimates and to account for recent changes in utility system conditions, such as change in fuel prices, construction and retirement schedules, and system demand projects

  7. Quad-Cities Station, Units 1 and 2. Semiannual operating report, January--June 1975

    International Nuclear Information System (INIS)

    1975-01-01

    Unit 1 generated 2,024,125 net electrical MWH and the generator was on line 3162.6 hours. Unit 2 generated 746,184 net electrical MWH and was on line 1475.3 hrs. Data is included concerning operations, power generation, shutdowns, maintenance, changes, and tests. (FS)

  8. H. B. Robinson Plant, Unit 2. Annual operating report for 1976

    International Nuclear Information System (INIS)

    1977-01-01

    The unit achieved a good performance record through the year, experiencing only short duration shutdowns or power reductions. Information is presented concerning operations, maintenance, shutdowns, and occupational radiation exposures. In November there was a scheduled refueling lasting 40 days. After a start-up physics test program, the unit achieved 100 percent power on December 22, 1976

  9. Dresden Nuclear Power Station, Units 1, 2, and 3. Annual operating report: January thru December 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Net electrical energy generated by Unit 1 was 953,015.5 MWH with the generator on line 7,399.37 hrs. Unit 2 generated 4,371,553.689 MWH with the generator on line 6,664.58 hrs while Unit 3 generated 4,034,251 MWH with the generator on line 7,234.86 hrs. Information is presented concerning operations, maintenance, and shutdowns

  10. 2006 Annual Operations Report for INTEC Operable Unit 3-13, Group 1, Tank Farm Interim Action

    International Nuclear Information System (INIS)

    D. E. Shanklin

    2007-01-01

    This annual operations report describes the requirements followed and activities conducted to inspect, monitor, and maintain the items installed during performance of the Waste Area Group 3, Operable Unit 3-13, Group 1, Tank Farm Interim Action, at the Idaho Nuclear Technology and Engineering Center. This report covers the time period from January 1 through December 31, 2006, and describes inspection and monitoring activities for the surface-sealed areas within the tank farm, concrete-lined ditches and culverts in and around the tank farm, the lift station, and the lined evaporation pond. These activities are intended to assure that the interim action is functioning adequately to meet the objectives stated in the Operable Unit 3-13, Record of Decision for the Group 1, Tank Farm Interim Action (DOE/ID-10660) as described in the Group 1 Remedial Design/Remedial Action Work Plan (DOE/ID-10772)

  11. 2005 Annual Operations Report for INTEC Operable Unit 3-13, Group 1, Tank Farm Interim Action

    International Nuclear Information System (INIS)

    D. Shanklin

    2006-01-01

    This annual operations report describes the requirements followed and activities conducted to inspect, monitor, and maintain the items installed during performance of the Waste Area Group 3, Operable Unit 3-13, Group 1, Tank Farm Interim Action, at the Idaho Nuclear Technology and Engineering Center. This report describes inspection and monitoring activities for the surface-sealed areas within the tank farm, concrete-lined ditches and culverts in and around the tank farm, the lift station, and the lined evaporation pond. These activities are intended to assure that the interim action is functioning adequately to meet the objectives stated in the Operable Unit 3-13, Record of Decision for the Group 1, Tank Farm Interim Action, (DOE/ID-10660) and as amended by the agreement to resolve dispute, which was effective in February 2003

  12. Joint Center for Operational Analysis Journal. Volume 12, Issue 1, Spring 2010

    Science.gov (United States)

    2010-01-01

    Saddam also counted on traditional Bedouin values as a favorable factor in his battle against the Americans. He believed that emphasizing courage and...Air National Guard, operates the Communica- tion Incident Mobile Command Post truck during the Vigilant Guard 2009 exercise in Helena, Mont ., Sept...EUCOM USEUCOM/ECJ37 Unit 30400 APO AE, 09131 user name phone# Col Cristos Vasilas (vasilasc) x4161 Ms. Kathleen Smith

  13. 78 FR 14361 - U.S. Steel Tubular Products, Inc., Mckeesport Tubular Operations Division, Subsidiary of United...

    Science.gov (United States)

    2013-03-05

    ... Products, Inc., Mckeesport Tubular Operations Division, Subsidiary of United States Steel Corporation, Mckeesport, PA; Notice of Initiation of Investigation To Terminate Certification of Eligibility Pursuant to... Tubular Products, McKeesport Tubular Operations Division, Subsidiary of United States Steel Corporation...

  14. Operating experience with unit for sulfuric acid alkylation of isobutane by butylenes

    Energy Technology Data Exchange (ETDEWEB)

    Tagavov, I.T.; Sumanov, V.T.; Khadzhiev, S.N.

    1988-09-01

    The operation of units for the sulfuric acid alkylation of isobutanes by butylenes have been performed. The reaction was carried out in a KSG-3 horizontal sulfuric acid contractor. A butane-butylene fraction from catalytic cracking and an isobutane fraction from the central gas fractionating unit were used as a feedstock. The studies have shown that the unit will give a high-quality product under various conditions of operation. The specific consumption of sulfuric acid in processing different types of feed remains within acceptable limits.

  15. Decommissioning strategy of the operating WWER type units in the Ukraine

    International Nuclear Information System (INIS)

    Litvinsky, L.L.; Lobach, Yu.N.; Skripov, A.E.

    2002-01-01

    At present in Ukraine, 13 WWER type units are in operation and two other ones are in the final stage of construction. Decommissioning of these units is expected after the year 2010. General planning of their decommissioning is developed in the framework of the decommissioning strategy of operating WWER type units. The strategy contains the objectives, principles and main tasks of the decommissioning as well as the activities at each phase of decommissioning. It is considered a broad range of factors important for the planning and implementation of decommissioning. (author)

  16. OPERATING OF MOBILE MACHINE UNITS SYSTEM USING THE MODEL OF MULTICOMPONENT COMPLEX MOVEMENT

    Directory of Open Access Journals (Sweden)

    A. Lebedev

    2015-07-01

    Full Text Available To solve the problems of mobile machine units system operating it is proposed using complex multi-component (composite movement physical models. Implementation of the proposed method is possible by creating of automatic operating systems of fuel supply to the engines using linear accelerometers. Some examples to illustrate the proposed method are offered.

  17. Operating of mobile machine units system using the model of multicomponent complex movement

    OpenAIRE

    A. Lebedev; R. Kaidalov; N. Artiomov; M. Shulyak; M. Podrigalo; D. Abramov; D. Klets

    2015-01-01

    To solve the problems of mobile machine units system operating it is proposed using complex multi-component (composite) movement physical models. Implementation of the proposed method is possible by creating of automatic operating systems of fuel supply to the engines using linear accelerometers. Some examples to illustrate the proposed method are offered.

  18. Oconee Nuclear Station, Units 1, 2, and 3. Semiannual operating report, January--June 1975

    International Nuclear Information System (INIS)

    1975-01-01

    Information is presented concerning operations, performance characteristics, changes, tests, inspections, containment leak tests, maintenance, primary coolant chemistry, station staff changes, reservoir investigations, plume mapping, and operational environmental radioactivity monitoring data for oconee Units 1, 2, and 3. The non-radiological environmental surveillance program is also described. (FS)

  19. Effect of RCIC Operating Conditions on the Accident Scenario in Fukushima Unit 2

    International Nuclear Information System (INIS)

    Kim, Sung Il; Park, Jong Hwa; Ha, Kwang Soon

    2015-01-01

    This study was conducted by using MELCOR 1.8.6. Fukushima unit 2 accident was analyzed using MELCOR in this study, and best estimate scenario with considering RCIC operating conditions was presented. Researches on the boiling water reactor (BWR) plant with reactor core isolation cooling (RCIC) system have been conducted. Research on the RCIC operation in Fukushima unit 2 was also conducted by Sandia National Laboratory. MELCOR analysis of the Fukushima unit 2 accident was conducted in the report and energy balance in wetwell was described by considering RCIC operation. However, the effect of RCIC operation condition on the accident scenario has not been studied. The operating conditions of RCIC system affect the pressures in wetwell and drywell, and the high pressure can make leakage path of fission product from PCV to reactor building. Thus it can be directly related with the amount of fission product which released to environment. In this study, severe accident on Fukushima unit 2 was analyzed considering the operating condition of RCIC system, and best estimated scenario was presented. In addition, the effect of RCIC turbine efficiency on the accident progression was examined. Energy balance in suppression chamber was also considered with discussion on the effect of torus room flooding level. It was found that the operating condition of RCIC turbine not only affects the variation of drywell pressure but also the amount of released fission products to environment. It was also confirmed that the RCIC turbine efficiency in the accident would be less than normal operating condition

  20. Estimates of emergency operating capacity in US manufacturing and nonmanufacturing industries - Volume 1: Concepts and Methodology

    Energy Technology Data Exchange (ETDEWEB)

    Belzer, D.B. (Pacific Northwest Lab., Richland, WA (USA)); Serot, D.E. (D/E/S Research, Richland, WA (USA)); Kellogg, M.A. (ERCE, Inc., Portland, OR (USA))

    1991-03-01

    Development of integrated mobilization preparedness policies requires planning estimates of available productive capacity during national emergency conditions. Such estimates must be developed in a manner to allow evaluation of current trends in capacity and the consideration of uncertainties in various data inputs and in engineering assumptions. This study developed estimates of emergency operating capacity (EOC) for 446 manufacturing industries at the 4-digit Standard Industrial Classification (SIC) level of aggregation and for 24 key nonmanufacturing sectors. This volume lays out the general concepts and methods used to develop the emergency operating estimates. The historical analysis of capacity extends from 1974 through 1986. Some nonmanufacturing industries are included. In addition to mining and utilities, key industries in transportation, communication, and services were analyzed. Physical capacity and efficiency of production were measured. 3 refs., 2 figs., 12 tabs. (JF)

  1. Timing of low tidal volume ventilation and intensive care unit mortality in acute respiratory distress syndrome. A prospective cohort study.

    Science.gov (United States)

    Needham, Dale M; Yang, Ting; Dinglas, Victor D; Mendez-Tellez, Pedro A; Shanholtz, Carl; Sevransky, Jonathan E; Brower, Roy G; Pronovost, Peter J; Colantuoni, Elizabeth

    2015-01-15

    Reducing tidal volume decreases mortality in acute respiratory distress syndrome (ARDS). However, the effect of the timing of low tidal volume ventilation is not well understood. To evaluate the association of intensive care unit (ICU) mortality with initial tidal volume and with tidal volume change over time. Multivariable, time-varying Cox regression analysis of a multisite, prospective study of 482 patients with ARDS with 11,558 twice-daily tidal volume assessments (evaluated in milliliter per kilogram of predicted body weight [PBW]) and daily assessment of other mortality predictors. An increase of 1 ml/kg PBW in initial tidal volume was associated with a 23% increase in ICU mortality risk (adjusted hazard ratio, 1.23; 95% confidence interval [CI], 1.06-1.44; P = 0.008). Moreover, a 1 ml/kg PBW increase in subsequent tidal volumes compared with the initial tidal volume was associated with a 15% increase in mortality risk (adjusted hazard ratio, 1.15; 95% CI, 1.02-1.29; P = 0.019). Compared with a prototypical patient receiving 8 days with a tidal volume of 6 ml/kg PBW, the absolute increase in ICU mortality (95% CI) of receiving 10 and 8 ml/kg PBW, respectively, across all 8 days was 7.2% (3.0-13.0%) and 2.7% (1.2-4.6%). In scenarios with variation in tidal volume over the 8-day period, mortality was higher when a larger volume was used earlier. Higher tidal volumes shortly after ARDS onset were associated with a greater risk of ICU mortality compared with subsequent tidal volumes. Timely recognition of ARDS and adherence to low tidal volume ventilation is important for reducing mortality. Clinical trial registered with www.clinicaltrials.gov (NCT 00300248).

  2. Operating experience feedback report -- turbine-generator overspeed protection systems: Commercial power reactors. Volume 11

    International Nuclear Information System (INIS)

    Ornstein, H.L.

    1995-04-01

    This report presents the results of the US Nuclear Regulatory Commission's Office for Analysis and Evaluation of Operational Data (AEOD) review of operating experience of main turbine-generator overspeed and overspeed protection systems. It includes an indepth examination of the turbine overspeed event which occurred on November 9, 1991, at the Salem Unit 2 Nuclear Power Plant. It also provides information concerning actions taken by other utilities and the turbine manufacturers as a result of the Salem overspeed event. AEOD's study reviewed operating procedures and plant practices. It noted differences between turbine manufacturer designs and recommendations for operations, maintenance, and testing, and also identified significant variations in the manner that individual plants maintain and test their turbine overspeed protection systems. AEOD's study provides insight into the shortcomings in the design, operation, maintenance, testing, and human factors associated with turbine overspeed protection systems. Operating experience indicates that the frequency of turbine overspeed events is higher than previously thought and that the bases for demonstrating compliance with NRC's General Design Criterion (GDC) 4, Environmental and dynamic effects design bases, may be nonconservative with respect to the assumed frequency

  3. Analysis of long-time operation of micro-cogeneration unit with fuel cell

    Directory of Open Access Journals (Sweden)

    Patsch Marek

    2015-01-01

    Full Text Available Micro-cogeneration is cogeneration with small performance, with maximal electric power up to 50 kWe. On the present, there are available small micro-cogeneration units with small electric performance, about 1 kWe, which are usable also in single family houses or flats. These micro-cogeneration units operate on principle of conventional combustion engine, Stirling engine, steam engine or fuel cell. Micro-cogeneration units with fuel cells are new progressive developing type of units for single family houses. Fuel cell is electrochemical device which by oxidation-reduction reaction turn directly chemical energy of fuel to electric power, secondary products are pure water and thermal energy. The aim of paper is measuring and evaluation of operation parameters of micro-cogeneration unit with fuel cell which uses natural gas as a fuel.

  4. United States Department of Energy, Nevada Operations Office, completion report Operation KLAXON, Fiscal Year 1993

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    The U.S. Department of Energy, Nevada Operations Office (DOE/NV), Completion Report provides a summary of activities conducted at the Nevada Test Site (NTS) between October 1, 1992, and September 30, 1993, associated with Operation KLAXON. (In the past, each annual Completion Report dealt with a series of underground nuclear detonations; however, because no nuclear tests were conducted during FY 1993, this Report summarizes continuing nonnuclear and nuclear test readiness activities at the NTS sponsored by DOE/NV.) The report serves as a reference for those involved with the planning and execution of Operation KLAXON and also serves as a planning guide for future operations. Information in the report covers the logistics and management of activities. Scientific information and data associated with NTS activities are presented in technical documents published by participating agencies. In September 1992, Congress legislated a nine-month moratorium on the testing of nuclear weapons. The bill also provided for a resumption of testing (with no more than five tests per year, or a total of 15 during the next three years) in July 1993, and mandated an end to nuclear testing, entirely, by 1996. President Bush signed the bill into law in October 1992.

  5. United States Department of Energy, Nevada Operations Office, completion report Operation KLAXON, Fiscal Year 1993

    International Nuclear Information System (INIS)

    1994-06-01

    The U.S. Department of Energy, Nevada Operations Office (DOE/NV), Completion Report provides a summary of activities conducted at the Nevada Test Site (NTS) between October 1, 1992, and September 30, 1993, associated with Operation KLAXON. (In the past, each annual Completion Report dealt with a series of underground nuclear detonations; however, because no nuclear tests were conducted during FY 1993, this Report summarizes continuing nonnuclear and nuclear test readiness activities at the NTS sponsored by DOE/NV.) The report serves as a reference for those involved with the planning and execution of Operation KLAXON and also serves as a planning guide for future operations. Information in the report covers the logistics and management of activities. Scientific information and data associated with NTS activities are presented in technical documents published by participating agencies. In September 1992, Congress legislated a nine-month moratorium on the testing of nuclear weapons. The bill also provided for a resumption of testing (with no more than five tests per year, or a total of 15 during the next three years) in July 1993, and mandated an end to nuclear testing, entirely, by 1996. President Bush signed the bill into law in October 1992

  6. Use of Special Operations Forces in United Nations Missions: a Method to Resolve Complexity

    Science.gov (United States)

    2015-05-21

    physical stamina and psychological stability, followed by a rigorous training program are the imperatives to create SOF soldiers.42 Mark Bowden in...recommendation is that the United Nations should establish a Special Operations planning cell within the UN Department of Peacekeeping Operations. As of...now, the cell is nonexistent. This cell should be able to facilitate the integration of SOF into the overall peace operations concept. Finally, the

  7. Indian Point Station, Units 1, 2, and 3. Annual operating report for 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Unit 1 remained in a shutdown condition pending a decision by the Company on the installation of an ECCS as required by NRC. Net electrical power generated by Unit 2 was 2,267,654 MWH with the unit on line 3,056.45 hrs. Unit 3 generated 1,872,947 MWH and was on line 2,286.01 hrs. Information is presented concerning operations, reportable events, corrective maintenance, fuel performance, radioactivity releases, shutdowns, primary coolant chemistry, and occupational radiation exposures

  8. Results of toxicity tests and chemical analyses conducted on sediments collected from the TNX Outfall Delta Operable Unit, July 1999

    International Nuclear Information System (INIS)

    Specht, W.L.

    2000-01-01

    In order to provide unit specific toxicity data that will be used to address critical uncertainty in the ecological risk assessment (ERA) for the TNX Outfall Delta Operable Unit (TNXOD OU), sediments were collected from eight locations in the Inner Swamp portion of the operable unit and two unit specific background locations. These samples were analyzed for total mercury, total uranium, and sediment toxicity

  9. An Analysis of United States Marine Corps Enlisted Entry-Level Training Using Supply Chain and Operations Management

    Science.gov (United States)

    2010-12-01

    An Analysis of United States Marine Corps Enlisted Entry-Level Training Using Supply Chain and Operations Management ______________________________________ By...Report 4. TITLE AND SUBTITLE: An Analysis of United States Marine Corps Enlisted Entry-Level Training Using Supply Chain and Operations Management 6...Level Training; United States Marine Corps; Operations Management ; Supply Chain Management; Process Analysis 16. PRICE CODE 17. SECURITY

  10. EPA RREL's mobile volume reduction unit advances soil washing at four Superfund sites

    International Nuclear Information System (INIS)

    Gaire, R.; Borst, M.

    1994-01-01

    Research testing of the US. Environmental Protection Agency (EPA) Risk Reduction Engineering Laboratory's (RREL) Volume Reduction Unit (VRU), produced data helping advance soil washing as a remedial technology for contaminated soils. Based on research at four Superfund sites, each with a different matrix of organic contaminants, EPA evaluated the soil technology and provided information to forecast realistic, full-scale remediation costs. Primarily a research tool, the VRU is RREL's mobile test unit for investigating the breadth of this technology. During a Superfund Innovative Technology Evaluation (SITE) Demonstration at Escambia Wood Treating Company Site, Pensacola, FL, the VRU treated soil contaminated with pentachlorophenol (PCP) and polynuclear aromatic hydrocarbon-laden creosote (PAH). At Montana Pole and Treatment Plant Site, Butte, MT, the VRU treated soil containing PCP mixed with diesel oil (measured as total petroleum hydrocarbons) and a trace of dioxin. At Dover Air Force Base Site, Dover, DE, the VRU treated soil containing JP-4 jet fuel, measured as TPHC. At Sand Creek Site, Commerce City, CO, the feed soil at this site was contaminated with two pesticides: heptachlor and dieldrin. Less than 10 percent of these pesticides remained in the treated coarse soil fractions

  11. Process automation system for integration and operation of Large Volume Plasma Device

    International Nuclear Information System (INIS)

    Sugandhi, R.; Srivastava, P.K.; Sanyasi, A.K.; Srivastav, Prabhakar; Awasthi, L.M.; Mattoo, S.K.

    2016-01-01

    Highlights: • Analysis and design of process automation system for Large Volume Plasma Device (LVPD). • Data flow modeling for process model development. • Modbus based data communication and interfacing. • Interface software development for subsystem control in LabVIEW. - Abstract: Large Volume Plasma Device (LVPD) has been successfully contributing towards understanding of the plasma turbulence driven by Electron Temperature Gradient (ETG), considered as a major contributor for the plasma loss in the fusion devices. Large size of the device imposes certain difficulties in the operation, such as access of the diagnostics, manual control of subsystems and large number of signals monitoring etc. To achieve integrated operation of the machine, automation is essential for the enhanced performance and operational efficiency. Recently, the machine is undergoing major upgradation for the new physics experiments. The new operation and control system consists of following: (1) PXIe based fast data acquisition system for the equipped diagnostics; (2) Modbus based Process Automation System (PAS) for the subsystem controls and (3) Data Utilization System (DUS) for efficient storage, processing and retrieval of the acquired data. In the ongoing development, data flow model of the machine’s operation has been developed. As a proof of concept, following two subsystems have been successfully integrated: (1) Filament Power Supply (FPS) for the heating of W- filaments based plasma source and (2) Probe Positioning System (PPS) for control of 12 number of linear probe drives for a travel length of 100 cm. The process model of the vacuum production system has been prepared and validated against acquired pressure data. In the next upgrade, all the subsystems of the machine will be integrated in a systematic manner. The automation backbone is based on 4-wire multi-drop serial interface (RS485) using Modbus communication protocol. Software is developed on LabVIEW platform using

  12. Process automation system for integration and operation of Large Volume Plasma Device

    Energy Technology Data Exchange (ETDEWEB)

    Sugandhi, R., E-mail: ritesh@ipr.res.in; Srivastava, P.K.; Sanyasi, A.K.; Srivastav, Prabhakar; Awasthi, L.M.; Mattoo, S.K.

    2016-11-15

    Highlights: • Analysis and design of process automation system for Large Volume Plasma Device (LVPD). • Data flow modeling for process model development. • Modbus based data communication and interfacing. • Interface software development for subsystem control in LabVIEW. - Abstract: Large Volume Plasma Device (LVPD) has been successfully contributing towards understanding of the plasma turbulence driven by Electron Temperature Gradient (ETG), considered as a major contributor for the plasma loss in the fusion devices. Large size of the device imposes certain difficulties in the operation, such as access of the diagnostics, manual control of subsystems and large number of signals monitoring etc. To achieve integrated operation of the machine, automation is essential for the enhanced performance and operational efficiency. Recently, the machine is undergoing major upgradation for the new physics experiments. The new operation and control system consists of following: (1) PXIe based fast data acquisition system for the equipped diagnostics; (2) Modbus based Process Automation System (PAS) for the subsystem controls and (3) Data Utilization System (DUS) for efficient storage, processing and retrieval of the acquired data. In the ongoing development, data flow model of the machine’s operation has been developed. As a proof of concept, following two subsystems have been successfully integrated: (1) Filament Power Supply (FPS) for the heating of W- filaments based plasma source and (2) Probe Positioning System (PPS) for control of 12 number of linear probe drives for a travel length of 100 cm. The process model of the vacuum production system has been prepared and validated against acquired pressure data. In the next upgrade, all the subsystems of the machine will be integrated in a systematic manner. The automation backbone is based on 4-wire multi-drop serial interface (RS485) using Modbus communication protocol. Software is developed on LabVIEW platform using

  13. 100 Area source operable unit focused feasibility study report. Draft A

    International Nuclear Information System (INIS)

    1994-09-01

    In accordance with the Hanford Past-Practice Strategy (HPPS), a focused feasibility study (FFS) is performed for those waste sites which have been identified as candidates for interim remedial measures (IRM) based on information contained in applicable work plans and limited field investigations (LFI). The FFS process for the 100 Area source operable units will be conducted in two stages. This report, hereafter referred to as the Process Document, documents the first stage of the process. In this stage, IRM alternatives are developed and analyzed on the basis of waste site groups associated with the 100 Area source operable units. The second stage, site-specific evaluation of the IRM alternatives presented in this Process Document, is documented in a series of operable unit-specific reports. The objective of the FFS (this Process Document and subsequent operable unit-specific reports) is to provide decision makers with sufficient information to allow appropriate and timely selection of IRM for sites associated with the 100 Area source operable units. Accordingly, the following information is presented: a presentation of remedial action objectives; a description of 100 Area waste site groups and associated group profiles; a description of IRM alternatives; and detailed and comparative analyses of the IRM alternatives

  14. The Applied Meteorology Unit: Nineteen Years Successfully Transitioning Research Into Operations for America's Space Program

    Science.gov (United States)

    Madura, John T.; Bauman, William H., III; Merceret, Francis J.; Roeder, William P.; Brody, Frank C.; Hagemeyer, Bartlett C.

    2011-01-01

    The Applied Meteorology Unit (AMU) provides technology development and transition services to improve operational weather support to America's space program . The AMU was founded in 1991 and operates under a triagency Memorandum of Understanding (MOU) between the National Aeronautics and Space Administration (NASA), the United States Air Force (USAF) and the National Weather Service (NWS) (Ernst and Merceret, 1995). It is colocated with the 45th Weather Squadron (45WS) at Cape Canaveral Air Force Station (CCAFS) and funded by the Space Shuttle Program . Its primary customers are the 45WS, the Spaceflight Meteorology Group (SMG) operated for NASA by the NWS at the Johnson Space Center (JSC) in Houston, TX, and the NWS forecast office in Melbourne, FL (MLB). The gap between research and operations is well known. All too frequently, the process of transitioning research to operations fails for various reasons. The mission of the AMU is in essence to bridge this gap for America's space program.

  15. Multipurpose units: combining of technological operations of a soil cultivating and seeding

    Directory of Open Access Journals (Sweden)

    D. A. Petukhov

    2015-01-01

    Full Text Available The modern domestic market of technique for grain crops seeding differs variety of machines brands and types. The intensive type technologies combining technological operations of a soil cultivating and grain crops seeding in one pass are more widely used. The authors have established that one-operational units in new machine park have to be replaced multipurpose, universal and combined machines. Such approach will reduce number of machines in grain production from 20-30 to 5-6 name titles. Possibilities of multipurpose sowing units for simultaneous fertilizers application, soil cultivating and weeds destruction were analyzed. It was specified that nowadays there are several technologies types with two, four or six operations overlapping. Operational performance, technological and economical efficiency of the best multipurpose and also efficiency of technological operations overlapping at grain crops cultivating in the conditions of their real operation and at a trial establishment in the Kuban research institute of information and technical and economic studies of agro-industrial complex engineering and technical services were studied. Tit was defined that use of multipurpose sowing units and also studied efficiency of decreases operational costs by 48-71 percent, fuel consumption - by 41-76 percent and reduces labor input by 72-80 percent. Thus grain crops seeding is possible in optimal agrotime because of 4-6 technological operations overlapping in one pass.

  16. Journal of Special Operations Medicine, Volume 4, Edition 4, Fall 2004

    Science.gov (United States)

    2004-01-01

    Donahue My American Journey Colin Powell (GEN Ret) & Joseph E Persico My Secret War Richard S Drury Night Jungle Operations Thomas B Bennett TITLE AUTHOR...USN Command Surgeon I keep General Colin Powell’s leadership primer on my desk top for reference and pull it out regular- ly to remind myself of what’s...point is important – immunization rates rivaled or exceeded those of the United States. Now, as Secretary of State Colin Powell may or may not have said

  17. Compex system for teaching and training operators for TPP and NPP power units

    International Nuclear Information System (INIS)

    Tsiptsyura, R.D.

    1985-01-01

    Requirements, taken as a principle for constructing the system for operator teaching and training (OTT), have been formulated on the basis of investigation of operators' work at TPP and NPP power units. Functional structure and a structural block-diagram for OTT are built. As a criterion, which determines the structure of any trainers, being a part of OTT a requirement has been chosen satisfying the correspondence beetween habits developed with the help of trainers and habits of real operators' work. Results of analysis permit to confirm that refusal or under statement of the role of any stage of operator training leads to reduction of quality of his training

  18. NRC plan for cleanup operations at Three Mile Island Unit 2

    International Nuclear Information System (INIS)

    Lo, R.; Snyder, B.J.

    1980-07-01

    The NRC plan defines the functional role of the NRC in cleanup operations at Three Mile Island Unit 2 to assure that agency regulatory responsibilities and objectives will be fulfilled. The plan outlines NRC functions in TMI-2 cleanup operations in the following areas: (1) the functional relationship of NRC to other government agencies, the public, and the licensee to coordinate activities, (2) the functional roles of these organizations in cleanup operations, (3) the NRC review and decision-making procedure for the licensee's proposed cleanup operation, (4) the NRC/licensee estimated schedule of major actions, and (5) NRC's functional role in overseeing implementation of approved licensee activities

  19. Office for Analysis and Evaluation of Operational Data. 1992 annual report: Nonreactors: Volume 7, No. 2

    Energy Technology Data Exchange (ETDEWEB)

    1993-10-01

    The annual report of the US Nuclear Regulatory Commission`s Office for Analysis and Evaluation of Operational Data (AEOD) is devoted to the activities performed during 1992. The report is published in two separate parts. NUREG-1272, Vol. 7, No. 1, covers power reactors and presents an overview of the operating experience of the nuclear power industry from the NRC perspective, including comments about the trends of some key performance measures. The report also includes the principal findings and issues identified in AEOD studies over the past year and summarizes information from such sources as licensee event reports, diagnostic evaluations, and reports to the NRC`s Operations Center. NUREG-1272, Vol. 7, No. 2, covers nonreactors and presents a review of the events and concerns during 1992 associated with the use of licensed material in nonreactor applications, such as personnel overexposures and medical misadministrations. Both reports also contain a discussion of the Incident Investigation Team program and summarize both the Incident Investigation Team and Augmented Inspection Team reports. Each volume contains a list of the AEOD reports issued for 1981--1992.

  20. Office for Analysis and Evaluation of Operational Data 1993 annual report: Volume 8, Number 1

    International Nuclear Information System (INIS)

    1994-11-01

    This annual report of the US Nuclear Regulatory Commission's Office for Analysis and Evaluation of Operational Data (AEOD) describes activities conducted during 1993. The report is published in two parts. NUREG-1272, Vol. 8, No. 1, covers power reactors and presents an overview of the operating experience of the nuclear power industry from the NRC perspective, including comments about the trends of some key performance measures. The report also includes the principal findings and issues identified in AEOD studies over the past year and summarizes information from such sources as licensee event reports, diagnostic evaluations, and reports to the NRC's Operations Center. NUREG-1272, Vol. 8, No. 2, covers nuclear materials and presents a review of the events and concerns during 1993 associated with the use of licensed material in nonreactor applications, such as personnel overexposures and medical misadministrations. Both reports also contain a discussion of the Incident Investigation Team program and summarize both the Incident Investigation Team and Augmented Inspection Team reports. Each volume contains a list of the AEOD reports issued from 1980 through 1993

  1. Office for Analysis and Evaluation of Operational Data 1996 annual report. Volume 10, Number 1: Reactors

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-01

    This annual report of the US Nuclear Regulatory Commission`s Office for Analysis and Evaluation of Operational Data (AEOD) describes activities conducted during 1996. The report is published in three parts. NUREG-1272, Vol. 10, No. 1, covers power reactors and presents an overview of the operating experience of the nuclear power industry from the NRC perspective, including comments about trends of some key performance measures. The report also includes the principal findings and issues identified in AEOD studies over the past year and summarizes information from such sources as licensee event reports and reports to the NRC`s Operations Center. NUREG-1272, Vol. 10, No. 2, covers nuclear materials and presents a review of the events and concerns during 1996 associated with the use of licensed material in nonreactor applications, such as personnel overexposures and medical misadministrations. Both reports also contain a discussion of the Incident Investigation Team program and summarize both the Incident Investigation Team and Augmented Inspection Team reports. Each volume contains a list of the AEOD reports issued from CY 1980 through 1996. NUREG-1272, Vol. 10, No. 3, covers technical training and presents the activities of the Technical Training Center in support of the NRC`s mission in 1996.

  2. Preliminary Validation of the Small Aircraft Transportation System Higher Volume Operations (SATS HVO) Concept

    Science.gov (United States)

    Williams, Daniel; Consiglio, Maria; Murdoch, Jennifer; Adams, Catherine

    2004-01-01

    This document provides a preliminary validation of the Small Aircraft Transportation System (SATS) Higher Volume Operations (HVO) concept for normal conditions. Initial results reveal that the concept provides reduced air traffic delays when compared to current operations without increasing pilot workload. Characteristic to the SATS HVO concept is the establishment of a newly defined area of flight operations called a Self-Controlled Area (SCA) which would be activated by air traffic control (ATC) around designated non-towered, non-radar airports. During periods of poor visibility, SATS pilots would take responsibility for separation assurance between their aircraft and other similarly equipped aircraft in the SCA. Using onboard equipment and simple instrument flight procedures, they would then be better able to approach and land at the airport or depart from it. This concept would also require a new, ground-based automation system, typically located at the airport that would provide appropriate sequencing information to the arriving aircraft. Further validation of the SATS HVO concept is required and is the subject of ongoing research and subsequent publications.

  3. Office for Analysis and Evaluation of Operational Data 1996 annual report. Volume 10, Number 1: Reactors

    International Nuclear Information System (INIS)

    1997-12-01

    This annual report of the US Nuclear Regulatory Commission's Office for Analysis and Evaluation of Operational Data (AEOD) describes activities conducted during 1996. The report is published in three parts. NUREG-1272, Vol. 10, No. 1, covers power reactors and presents an overview of the operating experience of the nuclear power industry from the NRC perspective, including comments about trends of some key performance measures. The report also includes the principal findings and issues identified in AEOD studies over the past year and summarizes information from such sources as licensee event reports and reports to the NRC's Operations Center. NUREG-1272, Vol. 10, No. 2, covers nuclear materials and presents a review of the events and concerns during 1996 associated with the use of licensed material in nonreactor applications, such as personnel overexposures and medical misadministrations. Both reports also contain a discussion of the Incident Investigation Team program and summarize both the Incident Investigation Team and Augmented Inspection Team reports. Each volume contains a list of the AEOD reports issued from CY 1980 through 1996. NUREG-1272, Vol. 10, No. 3, covers technical training and presents the activities of the Technical Training Center in support of the NRC's mission in 1996

  4. Study of the thermal behavior of a latent heat cold storage unit operating under frosting conditions

    International Nuclear Information System (INIS)

    Simard, A.P.; Lacroix, M.

    2003-01-01

    A study is performed of the thermal behavior of a latent heat cold storage unit operating under frosting conditions. This unit is employed to maintain the temperature inside the refrigerated compartment of a truck below 265 K. The system consists of parallel plates filled with a phase change material (PCM) that absorbs heat from the flow of warm moist air. A mathematical model for the system is first presented and, next, validated with numerical and experimental data. It is then exploited to assess the effects of design parameters and operating conditions on the performance of the system. The recommended thickness and distance separating the PCM plates are found to be 50x10 -3 and 30x10 -3 m, respectively. The results indicate that the performance of the unit is enhanced by turbulent air flow in spite of the increased pressure loss and accentuated frost growth. The unit also performs well even when the surrounding relative humidity is 100%

  5. Barriers to high conversion operations in an ebullated bed unit -- Relationship between sedimentation and operability

    Energy Technology Data Exchange (ETDEWEB)

    Sherwood, D. [Criterion Catalysts Company L.P., Houston, TX (United States)

    2000-07-01

    Ebullated-Bed (EB) catalytic processes are high temperature, high pressure residue hydrocrackers, which transform sour feeds into light, sweet products. EB processes typically involve one or more trains, with one, two, or three EB reactors in series. The key to operating any EB process is to control the 'sediment' which tends to increase with increasing level of conversion. Sediment problems are generally attributed to the catalyst. While this is true in some cases, there are certain problems that occur regardless of the catalyst used, whereas in some situations sediments from the EB process can actually be controlled by the catalyst. This paper describes two typical sedimentation patterns; one in which the sediment increases, and another in which sediment decreases as the EB products move through the recovery section. The benefits of sediment control are illustrated for the latter sedimentation pattern.

  6. Volume totalizers analysis of pipelines operated by TRANSPETRO National Operational Control Center; Analise de totalizadores de volume em oleodutos operados pelo Centro Nacional de Controle e Operacao da TRANSPETRO

    Energy Technology Data Exchange (ETDEWEB)

    Aramaki, Thiago Lessa; Montalvao, Antonio Filipe Falcao [Petrobras Transporte S.A. (TRANSPETRO), Rio de Janeiro, RJ (Brazil); Marques, Thais Carrijo [Universidade do Estado do Rio de Janeiro (UERJ), RJ (Brazil)

    2012-07-01

    This paper aims to present the results and methodology in the analysis of differences in volume totals used in systems such as batch tracking and leak detection of pipelines operated by the National Center for Operational Control (CNCO) at TRANSPETRO. In order to optimize this type of analysis, software was developed to acquisition and processing of historical data using the methodology developed. The methodology developed takes into account the particularities encountered in systems operated by TRANSPETRO, more specifically, by CNCO. (author)

  7. Estimation of the optimal operating conditions for a radiation chemical neutralization unit

    International Nuclear Information System (INIS)

    Putilov, A.V.; Kamenetskaya, S.A.; Pshezhetskii, S.Ya.; Kazakov, M.S.; Kudryavtsev, S.L.; Petrukhin, N.V.; Misharin, B.A.; Koneev, V.Z.

    1985-01-01

    An estimate is made of the effect of the hydrodynamic conditions on the efficiency of foam units for the radiation chemical neutralization of impurities, taking into account the penetrating power of accelerated electrons having various energies. Expressions are obtained for calculating the efficiency of such units with sectionized operation of the chamber and taking account of the effect of incomplete mixing of the products of radiolysis through the height of the foam layer

  8. Design and operational parameters of transportable supercritical water oxidation waste destruction unit

    International Nuclear Information System (INIS)

    McFarland, R.D.; Brewer, G.R.; Rofer, C.K.

    1991-12-01

    Supercritical water oxidation (SCWO) is the destruction of hazardous waste by oxidation in the presence of water at temperatures and pressures above its critical point. A 1 gal/h SCWO waste destruction unit (WDU) has been designed, built, and operated at Los Alamos National Laboratory. This unit is transportable and is intended to demonstrate the SCWO technology on wastes at Department of Energy sites. This report describes the design of the WDU and the preliminary testing phase leading to demonstration

  9. Control technique for enhancing the stable operation of distributed generation units within a microgrid

    International Nuclear Information System (INIS)

    Mehrasa, Majid; Pouresmaeil, Edris; Mehrjerdi, Hasan; Jørgensen, Bo Nørregaard; Catalão, João P.S.

    2015-01-01

    Highlights: • A control technique for enhancing the stable operation of distributed generation units is proposed. • Passivity-based control technique is considered to analyze the dynamic and steady-state behaviors. • The compensation of instantaneous variations in the reference current components is considered. • Simulation results confirm the performance of the control scheme within the microgrid. - Abstract: This paper describes a control technique for enhancing the stable operation of distributed generation (DG) units based on renewable energy sources, during islanding and grid-connected modes. The Passivity-based control technique is considered to analyze the dynamic and steady-state behaviors of DG units during integration and power sharing with loads and/or power grid, which is an appropriate tool to analyze and define a stable operating condition for DG units in microgrid technology. The compensation of instantaneous variations in the reference current components of DG units in ac-side, and dc-link voltage variations in dc-side of interfaced converters, are considered properly in the control loop of DG units, which is the main contribution and novelty of this control technique over other control strategies. By using the proposed control technique, DG units can provide the continuous injection of active power from DG sources to the local loads and/or utility grid. Moreover, by setting appropriate reference current components in the control loop of DG units, reactive power and harmonic current components of loads can be supplied during the islanding and grid-connected modes with a fast dynamic response. Simulation results confirm the performance of the control scheme within the microgrid during dynamic and steady-state operating conditions

  10. Turkey Point Plant, Units 3 and 4. Semiannual operating report No. 7, July--December 1975

    International Nuclear Information System (INIS)

    1976-01-01

    Unit 3 generated 1,968,074 MWh(e) net electric power and the generator was on line 2,802.9 hrs. Unit 4 generated 2,560,476 MWh(e) and was on line 3,944.8 hrs. Information is presented concerning operations, power generation, shutdowns, maintenance, changes, tests, experiments, radioactive effluent releases, radiological environmental monitoring, and occupational personnel radiation monitoring

  11. Interim action record of decision remedial alternative selection: TNX area groundwater operable unit

    International Nuclear Information System (INIS)

    Palmer, E.R.

    1994-10-01

    This document presents the selected interim remedial action for the TNX Area Groundwater Operable Unit at the Savannah River Site (SRS), which was developed in accordance with CERCLA of 1980, as amended by the Superfund Amendments and Reauthorization Act (SARA) of 1986, and to the extent practicable, the National Oil and Hazardous Substances Pollution contingency Plan (NCP). This decision is based on the Administrative Record File for this specific CERCLA unit

  12. Field Operations and Enforcement Manual for Air Pollution Control. Volume II: Control Technology and General Source Inspection.

    Science.gov (United States)

    Weisburd, Melvin I.

    The Field Operations and Enforcement Manual for Air Pollution Control, Volume II, explains in detail the following: technology of source control, modification of operations, particulate control equipment, sulfur dioxide removal systems for power plants, and control equipment for gases and vapors; inspection procedures for general sources, fuel…

  13. Reservoir release patterns for hydropower operations at the Aspinall Unit on the Gunnison River, Colorado

    International Nuclear Information System (INIS)

    Yin, S.C.L.; Sedlacek, J.

    1995-05-01

    This report presents the development of reservoir release patterns for the Aspinall Unit, which includes Blue Mesa, Morrow Point, and Crystal Reservoirs on the Gunnison River in Colorado. Release patterns were assessed for two hydropower operational scenarios--seasonally adjusted steady flows and seasonally adjusted high fluctuating flows--and three representative hydrologic years--moderate (1987), dry (1989), and wet (1983). The release patterns for the operational scenarios were developed with the aid of monthly, daily, and hourly reservoir operational models, which simulate the linked operation of the three Aspinall Unit reservoirs. Also presented are reservoir fluctuations and downstream water surface elevations corresponding to the reservoir release patterns. Both of the hydropower operational scenarios evaluated are based on the ecological research flows proposed by the US Fish and Wildlife Service for the Aspinall Unit. The first operational scenario allows only seasonally adjusted steady flows (no hourly fluctuations at any dam within one day), whereas the second scenario permits high fluctuating flows from Blue Mesa and Morrow Point Reservoirs during certain times of the year. Crystal Reservoir would release a steady flow within each day under both operational scenarios

  14. The physical boundary Hilbert space and volume operator in the Lorentzian new spin-foam theory

    International Nuclear Information System (INIS)

    Ding You; Rovelli, Carlo

    2010-01-01

    A covariant spin-foam formulation of quantum gravity has been recently developed, characterized by a kinematics which appears to match well the one of canonical loop quantum gravity. In this paper we reconsider the implementation of the constraints that defines the model. We define in a simple way the boundary Hilbert space of the theory, introducing a slight modification of the embedding of the SU(2) representations into the SL(2,C) ones. We then show directly that all constraints vanish on this space in a weak sense. The vanishing is exact (and not just in the large quantum number limit). We also generalize the definition of the volume operator in the spin-foam model to the Lorentzian signature and show that it matches the one of loop quantum gravity, as in the Euclidean case.

  15. High volume hydraulic fracturing operations: potential impacts on surface water and human health.

    Science.gov (United States)

    Mrdjen, Igor; Lee, Jiyoung

    2016-08-01

    High volume, hydraulic fracturing (HVHF) processes, used to extract natural gas and oil from underground shale deposits, pose many potential hazards to the environment and human health. HVHF can negatively affect the environment by contaminating soil, water, and air matrices with potential pollutants. Due to the relatively novel nature of the process, hazards to surface waters and human health are not well known. The purpose of this article is to link the impacts of HVHF operations on surface water integrity, with human health consequences. Surface water contamination risks include: increased structural failure rates of unconventional wells, issues with wastewater treatment, and accidental discharge of contaminated fluids. Human health risks associated with exposure to surface water contaminated with HVHF chemicals include increased cancer risk and turbidity of water, leading to increased pathogen survival time. Future research should focus on modeling contamination spread throughout the environment, and minimizing occupational exposure to harmful chemicals.

  16. Actinide data in the thermal energy range - International Evaluation Co-operation Volume 3

    International Nuclear Information System (INIS)

    Tellier, Henri; Weigmann, H.; Sowerby, M.; Mattes, Margarete; Matsunobu, Hiroyuki; Tsuchihashi, Keichiro; Halsall, M.J.; Weston, L.; Deruytter, A.J.

    1994-01-01

    A Working Party on International Evaluation Co-operation was established under the sponsorship of the OECD/NEA Nuclear Science Committee (NSC) to promote the exchange of information on nuclear data evaluations, validation, and related topics. Its aim is also to provide a framework for co-operative activities between members of the major nuclear data evaluation projects. This includes the possible exchange of scientists in order to encourage co-operation. Requirements for experimental data resulting from this activity are compiled. The Working Party determines common criteria for evaluated nuclear data files with a view to assessing and improving the quality and completeness of evaluated data. The Parties to the project are: ENDF (United States), JEFF/EFF (NEA Data Bank Member countries), and JENDL (Japan). Co-operation with evaluation projects of non-OECD countries are organised through the Nuclear Data Section of the International Atomic Energy Agency (IAEA). This report was issued by a Subgroup investigating actinide data in the thermal energy range. Thermal nuclear constants for the primary actinides have been extensively studies, but the most recent evaluations are not in full agreement with thermal reactor calculations. The objective of the Subgroup was to identify the origin of these differences and to reassess the recent evaluations. A considerable effort was devoted to the η of U-235, where analysis of lattice temperature coefficient measurements has suggested an energy dependent shape below thermal energy

  17. Prospects and requirements for an operational modelling unit in flood crisis situations

    Directory of Open Access Journals (Sweden)

    Anders Katharina

    2016-01-01

    Full Text Available Dike failure events pose severe flood crisis situations on areas in the hinterland of dikes. In recent decades the importance of being prepared for dike breaches has been increasingly recognized. However, the pre-assessment of inundation resulting from dike breaches is possible only based on scenarios, which might not reflect the situation of a real event. This paper presents a setup and workflow that allows to model dike breachinduced inundation operationally, i.e. when an event is imminent or occurring. A comprehensive system setup of an operational modelling unit has been developed and implemented in the frame of a federal project in Saxony-Anhalt, Germany. The modelling unit setup comprises a powerful methodology of flood modelling and elaborated operational guidelines for crisis situations. Nevertheless, it is of fundamental importance that the modelling unit is instated prior to flood events as a permanent system. Moreover the unit needs to be fully integrated in flood crisis management. If these crucial requirements are met, a modelling unit is capable of fundamentally supporting flood management with operational prognoses of adequate quality even in the limited timeframe of crisis situations.

  18. Biblis 1,300 MW unit B in operation for thirty years

    International Nuclear Information System (INIS)

    Lauer, H.

    2006-01-01

    Over the past thirty years, unit B of the Biblis nuclear power station has contributed towards safe, reliable and non-polluting electricity generation. Unit B was the first 1,300 MW unit in the world confirming the good experience accumulated in the construction and operation of plants this size. It laid the foundation for the advanced development of nuclear power plants up to the convoy line. The good availability this plant has achieved in its operating cycles proves the mature state of technology and the high level of qualification and motivation of the power plant staff and the personnel of external firms contracted to work for Biblis. Biblis B has served as a reference plant in German nuclear safety research, demonstrating that units this size can be operated safely. Unit B is also living proof of the possibility to raise nuclear power plants built in the seventies to the current state of the art by implementing the appropriate backfitting and modernization measures. Today, Biblis B is operated at a safety level clearly higher than that to be achieved for new plants internationally. This is also evident from comparison with the guiding values for the safety of new facilities as published by the International Atomic Energy Agency (IAEA). (orig.)

  19. Qualitative risk assessment for the 100-KR-4 groundwater operable unit

    Energy Technology Data Exchange (ETDEWEB)

    Biggerstaff, R.L.

    1994-06-30

    This report provides the qualitative risk assessment (QRA) for the 100-KR-4 groundwater operable unit at the US Department of Energy`s (DOE) Hanford Site in southeastern Washington State. The extent of the groundwater beneath the 100 K Area is defined in the Remedial Investigation/Feasibility Study Work Plan for the 100-KR-4 Operable Unit (DOE-RL 1992a). The QRA is an evaluation or risk using a limited amount of data and a predefined set of human and environmental exposure scenarios and is not intended to replace or be a substitute for a baseline risk assessment.

  20. Operable Unit 3-13, Group 3, Other Surface Soils (Phase II) Field Sampling Plan

    Energy Technology Data Exchange (ETDEWEB)

    G. L. Schwendiman

    2006-07-27

    This Field Sampling Plan describes the Operable Unit 3-13, Group 3, Other Surface Soils, Phase II remediation field sampling activities to be performed at the Idaho Nuclear Technology and Engineering Center located within the Idaho National Laboratory Site. Sampling activities described in this plan support characterization sampling of new sites, real-time soil spectroscopy during excavation, and confirmation sampling that verifies that the remedial action objectives and remediation goals presented in the Final Record of Decision for Idaho Nuclear Technology and Engineering Center, Operable Unit 3-13 have been met.

  1. Engineering evaluation/conceptual plan for the 200-UP-1 groundwater operable unit interim remedial measure

    International Nuclear Information System (INIS)

    Myers, D.A.; Swanson, L.C.; Weeks, R.S.; Giacinto, J.; Gustafson, F.W.; Ford, B.H.; Wittreich, C.; Parnell, S.; Green, J.

    1995-04-01

    This report presents an engineering evaluation and conceptual plan for an interim remedial measure (ERM) to address a uranium and technetium-99 groundwater plume and an associated nitrate contamination plume in the 200-UP-1 Groundwater Operable Unit located in the 200 West Area of the Hanford Site. This report provides information regarding the need and potentially achievable objectives and goals for an IRM and evaluates alternatives to contain elevated concentrations of uranium, technetium-99, nitrate, and carbon tetrachloride and to obtain information necessary to develop final remedial actions for the operable unit

  2. Qualitative risk assessment for the 100-KR-4 groundwater operable unit

    International Nuclear Information System (INIS)

    Biggerstaff, R.L.

    1994-01-01

    This report provides the qualitative risk assessment (QRA) for the 100-KR-4 groundwater operable unit at the US Department of Energy's (DOE) Hanford Site in southeastern Washington State. The extent of the groundwater beneath the 100 K Area is defined in the Remedial Investigation/Feasibility Study Work Plan for the 100-KR-4 Operable Unit (DOE-RL 1992a). The QRA is an evaluation or risk using a limited amount of data and a predefined set of human and environmental exposure scenarios and is not intended to replace or be a substitute for a baseline risk assessment

  3. RCRA facility investigation report for the 200-PO-1 operable unit. Revision 1

    International Nuclear Information System (INIS)

    1997-05-01

    This Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) report is prepared in support of the RFI/corrective measures study process for the 200-PO-1 Groundwater Operable Unit in the 200 East Area of the Hanford Site. This report summarizes existing information on this operable unit presented in the 200 East and PUREX Aggregate Area Management Study Reports, contaminant specific studies, available modeling data, and groundwater monitoring data summary reports. Existing contaminant data are screened against current regulatory limits to determine contaminants of potential concern (COPC). Each identified COPC is evaluated using well-specific and plume trend analyses

  4. Survey Method for Radiological Surveys of 300-FF-1 Operable Unit Soils and Material

    International Nuclear Information System (INIS)

    Brehm, D.M.

    1998-06-01

    This technical basis is to be used to survey soils at the 300-FF-1 Operable Unit during remediation of the site. Its purpose is to provide a basis for the survey methods to be employed by radiological control technician (RCTs) to guide the excavation effort in accordance with the 300-FF-1 waste site Record of Decision (ROD). The ROD for the 300-FF-1 Operable Unit requires selective excavation, removal, and disposal of contaminated soil above 350 pCi/g total uranium activity. Soil above this level will be disposed of as radioactive waste. The remaining soil will remain onsite

  5. Phase 1 remedial investigation report for 200-BP-1 operable unit

    International Nuclear Information System (INIS)

    1993-09-01

    The US Department of Energy (DOE) Hanford Site, in Washington State is organized into numerically designated operational areas including the 100, 200, 300, 400, 600, and 1100 Areas. The US Environmental Protection Agency (EPA), in November 1989 included the 200 Areas of the Hanford Site on the National Priority List (NPL) under the Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA). Inclusion on the NPL initiated the remedial investigation (RD process for the 200-BP-1 operable unit. These efforts are being addressed through the Hanford Federal Facility Agreement and Consent Order (Ecology et al. 1989) which was negotiated and approved by the DOE, the EPA, and the State of Washington Department of Ecology (Ecology) in May 1989. This agreement, known as the Tri-Party Agreement, governs all CERCLA efforts at Hanford. In March of 1990, the Department of Energy, Richland Operations (DOE-RL) issued a Remedial Investigation/Feasibility Study (RI/FS) work plan (DOE-RL 1990a) for the 200-BP-1 operable unit. The work plan initiated the first phase of site characterization activities associated with the 200-BP-1 operable unit. The purpose of the 200-BP-1 operable unit RI is to gather and develop the necessary information to adequately understand the risks to human health and the environment posed by the site and to support the development and analysis of remedial alternatives during the FS. The RI analysis will, in turn, be used by Tri-Party Agreement signatories to make a risk-management-based selection of remedies for the releases of hazardous substances that have occurred from the 200-BP-1 operable unit

  6. Structural characterization and condition for measurement statistics preservation of a unital quantum operation

    International Nuclear Information System (INIS)

    Lee, Kai-Yan; Fung, Chi-Hang Fred; Chau, H F

    2013-01-01

    We investigate the necessary and sufficient condition for a convex cone of positive semidefinite operators to be fixed by a unital quantum operation ϕ acting on finite-dimensional quantum states. By reducing this problem to the problem of simultaneous diagonalization of the Kraus operators associated with ϕ, we can completely characterize the kinds of quantum states that are fixed by ϕ. Our work has several applications. It gives a simple proof of the structural characterization of a unital quantum operation that acts on finite-dimensional quantum states—a result not explicitly mentioned in earlier studies. It also provides a necessary and sufficient condition for determining what kind of measurement statistics is preserved by a unital quantum operation. Finally, our result clarifies and extends the work of Størmer by giving a proof of a reduction theorem on the unassisted and entanglement-assisted classical capacities, coherent information, and minimal output Renyi entropy of a unital channel acting on a finite-dimensional quantum state. (paper)

  7. Peach Bottom Atomic Power Station, Units 2 and 3. Annual operating report: January--December 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Unit 2 experienced 11 forced outages, 5 power reductions, and one major refueling outage which lasted about 3 months during which time the feedwater spargers were replaced. Net electrical power generated was 5,569,633 MWH with the generator on line 5,998 hrs. Unit 3 experienced 17 forced outages, 11 power reductions and 2 major outages. The first refueling outage began 12/24/77. Net electrical power generated was 6,049,644 MWH with the unit on line 6,829 hrs. Information is presented concerning operations, personnel exposures, radioactive releases, maintenance, and irradiated fuel examination

  8. NUMATH: a nuclear-material-holdup estimator for unit operations and chemical processes

    International Nuclear Information System (INIS)

    Krichinsky, A.M.

    1981-01-01

    A computer program, NUMATH (Nuclear Material Holdup Estimator), has been developed to permit inventory estimation in vessels involved in unit operations and chemical processes. This program has been implemented in an operating nuclear fuel processing plant. NUMATH's purpose is to provide steady-state composition estimates for material residing in process vessels until representative samples can be obtained and chemical analyses can be performed. Since these compositions are used for inventory estimation, the results are determined for and cataloged in container-oriented files. The estimated compositions represent material collected in applicable vessels-including consideration for material previously acknowledged in these vessels. The program utilizes process measurements and simple material balance models to estimate material holdups and distribution within unit operations. During simulated run testing, NUMATH-estimated inventories typically produced material balances within 7% of the associated measured material balances for uranium and within 16% of the associated, measured material balance for thorium during steady-state process operation

  9. Categorization of safety related motor operated valve safety significance for Ulchin Unit 3

    International Nuclear Information System (INIS)

    Kang, D. I.; Kim, K. Y.

    2002-03-01

    We performed a categorization of safety related Motor Operated Valve (MOV) safety significance for Ulchin Unit 3. The safety evaluation of MOV of domestic nuclear power plants affects the generic data used for the quantification of MOV common cause failure ( CCF) events in Ulchin Units 3 PSA. Therefore, in this study, we re-estimated the MGL(Multiple Greek Letter) parameter used for the evaluation of MOV CCF probabilities in Ulchin Units 3 Probabilistic Safety Assessment (PSA) and performed a classification of the MOV safety significance. The re-estimation results of the MGL parameter show that its value is decreased by 30% compared with the current value in Ulchin Unit 3 PSA. The categorization results of MOV safety significance using the changed value of MGL parameter shows that the number of HSSCs(High Safety Significant Components) is decreased by 54.5% compared with those using the current value of it in Ulchin Units 3 PSA

  10. Effectiveness of 131I nor-cholesterol uptake per unit volume of adrenal adenoma in the diagnosis of aldosteronoma

    International Nuclear Information System (INIS)

    Kita, Tamotsu; Tomita, Hiroko; Sakaguchi, Chiharu

    2010-01-01

    Diagnosis of adrenal adenomas for patients with primary aldosteronism is sometimes difficult only by referring to the visualization pattern in adrenocortical scintigraphy without regards to standard scintigraphy or suppression scintigraphy with dexamethasone. We studied if quantitative evaluation of the standard scintigraphy without dexamethasone suppression can be useful to diagnose aldosteronomas. Twenty-nine patients who had undergone adrenalectomy with different clinical manifestations (16 patients with primary aldosteronism, 6 patients with Cushing's syndrome and 7 patients without hormonal abnormality) were included in the study. Volume of the adrenocortical adenomas, 131 I nor-cholesterol uptake of the adrenocortical adenomas, and 131 I nor-cholesterol uptake per unit volume of the adrenocortical adenomas were compared between the 3 groups. The volume of adrenocortical adenomas in the patients with primary aldosteronism was significantly lower than those in the other two groups (Cushing's syndrome p 131 I nor-cholesterol uptake of adrenocortical adenoma. The 131 I nor-cholesterol uptake per unit volume of adrenocortical adenomas was significantly higher in the patients with primary aldosteronism than those in the other two groups (Cushing's syndrome p 131 I nor-cholesterol uptake per unit volume of adenoma obtained from adrenocortical scintigraphy without dexamethasone suppression can be useful in the diagnosis of aldosteronoma. (author)

  11. Volumization of the Brow at the Time of Blepharoplasty: Treating the Eyebrow Fat Pad as an Independent Unit.

    Science.gov (United States)

    Vrcek, Ivan; Chou, Eva; Somogyi, Marie; Shore, John W

    Loss of volume in the sub-brow fat pad with associated descent of the eyebrow is a common anatomical finding resulting in both functional and aesthetic consequences. A variety of techniques have been described to address brow position at the time of blepharoplasty. To our knowledge, none of these techniques treat the sub-brow fat pad as an isolated unit. Doing so enables the surgeon to stabilize and volumize the brow without resultant tension on the blepharoplasty wound. The authors describe a technique for addressing volume loss in the eyebrow with associated brow descent that treats the sub-brow fat pad as an isolated unit. A retrospective review of all patients undergoing brow ptosis repair by a single surgeon (J.W.S.) over an 11-month period was performed. Eighteen patients and 33 brows underwent the technique described. Patients were followed for an average of 11 weeks (range: 4 weeks to 20 weeks). All patients preoperatively displayed both visually significant dermatochalasis and brow descent below the orbital rim. Evaluation of pre- and postoperative photos demonstrates successful volumization of the brow with skin redraping without focal dimpling or undue tension on the eyelid wound. Performing a dissection that allows the sub-brow fat pad to be elevated in isolation from the overlying orbicularis and underlying periosteum allows for volumization and of the brow without compromising closure. This technique is a safe and effective means of volumizing the brow and treating secondary brow descent.

  12. Assessment of maxillary sinus volume for the sinus lift operation by three-dimensional magnetic resonance imaging.

    Science.gov (United States)

    Gray, C F; Staff, R T; Redpath, T W; Needham, G; Renny, N M

    2000-05-01

    To calculate sinus and bone graft volumes and vertical bone heights from sequential magnetic resonance imaging (MRI) examinations in patients undergoing a sinus lift operation. MRI scans were obtained pre-operatively and at 10 days and 10 weeks post-operatively, using a 0.95 tesla MRI scanner and a three-dimensional (3D) magnetisation prepared, rapid acquisition gradient-echo (MP-RAGE) sequence. Estimates of the bone graft volumes required for a desired vertical bone height were made from the pre-operative MRI scan. Measurements of the graft volumes and bone heights actually achieved were made from the post-operative scans. The MRI appearance of the graft changed between the 10 day and 10 week scans. We have proposed a technique which has the potential to give the surgeon an estimate of the optimum volume of graft for the sinus lift operation from the pre-operative MRI scan alone and demonstrated its application in a single patient. Changes in the sequential MRI appearance of the graft are consistent with replacement of fluid by a matrix of trabecular bone.

  13. Waterborne Transportation Lines of the United States : calendar year 1999. Volume 2 : vessel company summary

    Science.gov (United States)

    2001-01-01

    The Vessel Company Summary, : Volume 2, is one of three publications for : the annual revision of the WTLUS, which : provides a summary of the vessel : companies detailed in the WTLUS, Vessel : Characteristics, Volume 3. The names of : the vessel com...

  14. Waterborne Transportation Lines of the United States : calendar year 2008. Volume 2 : vessel company summary

    Science.gov (United States)

    2009-11-16

    The Vessel Company Summary, Volume 2, : is one of three publications for the annual : revision of the WTLUS, which provides a summary : of the vessel companies detailed in the : WTLUS, Vessel Characteristics, Volume 3. : The names of the vessel compa...

  15. Denver Radium Site -- Operable Unit I closeout report for the US Environmental Protection Agency

    International Nuclear Information System (INIS)

    1992-08-01

    The Denver Radium Site consists of properties in the Denver, Colorado, area having radioactive contamination left from radium processing in the early 1900s. The properties are divided into 11 gaps or operable units to facilitate remedial action of the Site. Operable Unit I is an 8-acre block bounded by Quivas Street to the east, Shoshone Street to the west, West 12th Avenue to the south, and West 13th Avenue to the north. The primary focus of interest concerning investigations of radiological contamination was a radium, vanadium, and uranium processing facility at 1201 Quivas Street owned by the Pittsburgh Radium Company (PRC) from 1925 until 1926. The Radium Ores Company, which was associated with PRC, operated the facility until 1927. A Remedial investigation (RI) of Operable Unit I was prepared by Jacobs Engineering Group and CH 2 M Hill on behalf of EPA in April 1986. The draft Feasibility Study (FS), prepared by Jacobs Engineering Group and CH 2 M Hill, was issued in July 1987 (the final FS is the Community Relations Responsiveness Summary with an errata to the draft, issued September 1987). The RI focused on radium uranium processing residues discarded in the early 1900s. These residues contained uranium, radium, and thorium. EPA s Community Relations Plan involved the community in the decision-making process relating to the remedy to be implemented at Operable Unit X, and promoted communications among interested parties throughout the course of the project. The remedial action alternative preferred by EPA for Operable Unit I was Off-Site Permanent Disposal. Because a permanent disposal facility was not available at the time the Record of Decision was issued in September 1987, EPA selected the On-Site Temporary Containment (capping) with the Off-Site Permanent Disposal alternative

  16. Federal Radiological Monitoring and Assessment Center Monitoring Manual Volume 1, Operations

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Aerial Measurement Systems

    2012-07-31

    The Monitoring division is primarily responsible for the coordination and direction of: Aerial measurements to delineate the footprint of radioactive contaminants that have been released into the environment. Monitoring of radiation levels in the environment; Sampling to determine the extent of contaminant deposition in soil, water, air and on vegetation; Preliminary field analyses to quantify soil concentrations or depositions; and Environmental and personal dosimetry for FRMAC field personnel, during a Consequence Management Response Team (CMRT) and Federal Radiological Monitoring and Assessment Center (FRMAC) response. Monitoring and sampling techniques used during CM/FRMAC operations are specifically selected for use during radiological emergencies where large numbers of measurements and samples must be acquired, analyzed, and interpreted in the shortest amount of time possible. In addition, techniques and procedures are flexible so that they can be used during a variety of different scenarios; e.g., accidents involving releases from nuclear reactors, contamination by nuclear waste, nuclear weapon accidents, space vehicle reentries, or contamination from a radiological dispersal device. The Monitoring division also provides technicians to support specific Health and Safety Division activities including: The operation of the Hotline; FRMAC facility surveys; Assistance with Health and Safety at Check Points; and Assistance at population assembly areas which require support from the FRMAC. This volume covers deployment activities, initial FRMAC activities, development and implementation of the monitoring and assessment plan, the briefing of field teams, and the transfer of FRMAC to the EPA.

  17. National symposium on commissioning and operating experiences in heavy water plants and associated chemical industries [Preprint volume

    International Nuclear Information System (INIS)

    1992-02-01

    A symposium on commissioning and operating experiences in heavy water plants and associated chemical industries (SCOPEX-92) was organised to share the experience and exchange the ideas among plant operators, designers, consultants and vendors in the areas of operation, commissioning and equipment performance. This pre-print volume has been brought out as an integrated source of information on commissioning and operation of heavy water plants. The following aspects of heavy water plants are covered: commissioning and operation, instrumentation and control, and safety and environment. (V.R.)

  18. 40 CFR 60.2989 - Does this subpart directly affect incineration unit owners and operators in my State?

    Science.gov (United States)

    2010-07-01

    ... incineration unit owners and operators in my State? 60.2989 Section 60.2989 Protection of Environment... SOURCES Emission Guidelines and Compliance Times for Other Solid Waste Incineration Units That Commenced... incineration unit owners and operators in my State? (a) No, this subpart does not directly affect incineration...

  19. 40 CFR 62.15145 - What are the operating practice requirements for my municipal waste combustion unit?

    Science.gov (United States)

    2010-07-01

    ... requirements for my municipal waste combustion unit? 62.15145 Section 62.15145 Protection of Environment... Combustion Units Constructed on or Before August 30, 1999 Good Combustion Practices: Operating Requirements § 62.15145 What are the operating practice requirements for my municipal waste combustion unit? (a) You...

  20. Human factors review of electric power dispatch control centers. Volume 3. Operator information needs summary. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Miller, R.J.; Najaf-Zadeh, K.; Darlington, H.T.; McNair, H.D.; Seidenstein, S.; Williams, A.R.

    1982-10-01

    Human factors is a systems-oriented interdisciplinary specialty concerned with the design of systems, equipment, facilities and the operational environment. An important aspect leading to the design requirements is the determination of the information requirements for electric power dispatch control centers. There are significant differences between the system operator's actions during normal and degraded states of power system operation, and power system restoration. This project evaluated the information the operator requires for normal power system and control system operations and investigates the changes of information required by the operator as the power system and/or the control system degrades from a normal operating state. The Phase II study, published in two volumes, defines power system states and control system conditions to which operator information content can be related. This volume presents a summary of operator information needs, identifying the needs for and the uses of power system information by a system operator in conditions ranging from normal through degraded operation. Training requirements are also included for planning entry-level and follow-on training for operators.

  1. RCRA facility investigation/corrective measures study work plan for the 100-HR-1 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US. Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under the Hanford Federal Facility Agreement and Consent Order, signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the RCRA facility investigation/corrective measures study (RFI/CMS) for the 100-HR-1 source operable unit. Source operable units include facilities and unplanned release sites that are potential sources of contamination. The 100-HR-3 operable unit underlies the D/DR and H Areas, the 600 Area between them, and the six source operable units these areas contain. The 100-HR-3 operable unit includes all contamination found in the aquifer soils and water within its boundary. Separate work plans have been initiated for the 100-HR-3 groundwater operable unit (DOE-RL 1992a) and the 100-DR-1 (DOE-RL 1992b) source operable units

  2. Hydrologic resources management program and underground test area operable unit fy 1997

    Energy Technology Data Exchange (ETDEWEB)

    Smith, D. F., LLNL

    1998-05-01

    This report present the results of FY 1997 technical studies conducted by the Lawrence Livermore National Laboratory (LLNL) as part of the Hydrology and Radionuclide Migration Program (HRMP) and Underground Test Area Operable Unit (UGTA). The HRMP is sponsored by the US Department of Energy to assess the environmental (radiochemical and hydrologic) consequences of underground nuclear weapons testing at the Nevada Test Site.

  3. Use of the LITEE Lorn Manufacturing Case Study in a Senior Chemical Engineering Unit Operations Laboratory

    Science.gov (United States)

    Abraham, Nithin Susan; Abulencia, James Patrick

    2011-01-01

    This study focuses on the effectiveness of incorporating the Laboratory for Innovative Technology and Engineering Education (LITEE) Lorn Manufacturing case into a senior level chemical engineering unit operations course at Manhattan College. The purpose of using the case study is to demonstrate the relevance of ethics to chemical engineering…

  4. Ambiguity in Units and the Referents: Two Cases in Rational Number Operations

    Science.gov (United States)

    Rathouz, Margaret

    2010-01-01

    I explore the impact of ambiguous referral to the unit on understanding of decimal and fraction operations during episodes in two different mathematics courses for pre-service teachers (PSTs). In one classroom, the instructor introduces a rectangular area diagram to help the PSTs visualize decimal multiplication. A transcript from this classroom…

  5. Qualitative risk assessment for the 100-NR-2 Operable Unit. Revision 1

    International Nuclear Information System (INIS)

    1995-03-01

    This qualitative risk assessment provides information about the 100- NR-2 Groundwater Operable Unit of the Hanford reservation. Topics discussed in this report are: data evaluation; human health risk assessment overview; ecological evaluations; summary of uncertainty; results of both the ecological and human health evaluations; toxicity assessment; risk characterization; and a summary of contaminants of potential concern

  6. Limited field investigation report for the 100-KR-4 Operable Unit

    International Nuclear Information System (INIS)

    1994-07-01

    This limited field investigation (LFI) was conducted to optimize the use of interim remedial measures (IRM) for expediting clean up while maintaining a technically sound and cost-effective program. The 100-KR-4 Operable Unit is one of four operable units associated with the 100 K Area. Operable units KR-1, KR-2 and KR-3 address contaminant sources while 100-KR-4 addresses contamination present in the underlying groundwater. The IRM decision process for groundwater operable units is based on three aspects: (1) Is the concentration greater than Hanford background? (2) Does the concentration present a medium or high human-health risk? (3) Does the concentration exceed an ecologically based applicable, relevant and appropriate requirements (ARAR) or present an environmental hazard quotient > I? The primary methods of investigation used during this LFI were the installation of monitoring wells and sampling of groundwater. The samples collected from the groundwater and soils were submitted for laboratory analysis. Boreholes were surveyed for radiological contamination using downhole geophysical techniques to further delineate the location and degree of contamination. All soil samples were screened to ascertain the presence of volatile organic compounds and radionuclides. Analytical data were subjected to validation; all first round and a minimum of 10% of subsequent round data were validated

  7. Donald C. Cook Nuclear Power Plant, Unit 1. Annual operating report for 1976

    International Nuclear Information System (INIS)

    1977-01-01

    The unit was paralleled to the grid 83.1 percent of the time and 7,073,200 MWH gross was generated. There were six scheduled outages and 14 forced outages/load reductions. Information is presented concerning operations, shutdowns, power reductions, inservice maintenance, personnel radiation exposures, fuel history, and facility changes

  8. Storm water control plan for the Lower East Fork Poplar Creek Operable Unit, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-04-01

    This document provides the Environmental Restoration Program with information about the erosion and sediment control, storm water management, maintenance, and reporting and record keeping practices to be employed during Phase II of the remediation project for the Lower East Fork Poplar Creek (LEFPC) Operable Unit

  9. A Moveable Feast--A Progressive Approach to the Unit Operations Laboratory

    Science.gov (United States)

    Conner, Wm. Curtis, Jr.; Hammond, Karl D.; Laurence, Robert L.

    2011-01-01

    The authors describe an alternative format for the senior laboratory in which students are allowed--indeed, expected--to communicate with previous groups and build on their results. The effect is a unit operations laboratory in which students are empowered to propose the experiments they wish to do and in which the cumulative experience of the…

  10. Interim Action Proposed Plan for the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit; FINAL

    International Nuclear Information System (INIS)

    Bradley, J.

    2002-01-01

    The purpose of this Interim Action Proposed Plan (IAPP) is to describe the preferred interim remedial action for addressing the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit and to provide an opportunity for public input into the remedial action selection process

  11. Limited field investigation report for the 100-DR-1 Operable Unit

    International Nuclear Information System (INIS)

    1994-06-01

    This limited field investigation (LFI) report summarizes the data collection and analysis activities conducted during the 100-DR-1 Source Operable Unite LFI and the associated qualitative risk assessment (QRA), and makes recommendations on the continued candidacy of high-priority sites for interim remedial measures (IRM). The results and recommendations presented in this report are generally independent of future land use scenarios. The 100-DR-1 Operable Unit is one of four operable units associated with the 100 D/DR Area at the Hanford Site. The 100-DR-1 Operable Unit encompasses approximately 1.5 km 2 (0.59 mi 2 ) and is located immediately adjacent to the Columbia River shoreline. In general, it contains waste facilities associated with the original plant facilities constructed to support D Reactor facilities, as well as cooling water retention basin systems for both D and DR Reactors. The 100-DR-1 LFI began the investigative phase of the remedial investigation for a select number of high-priority sites. The LFI was performed to provide additional data needed to support selection, design and implementation of IRM, if needed. The LFI included data compilation, nonintrusive investigations, intrusive investigations, summarization of 100 Area aggregate studies, and data evaluation

  12. NSSS design and cycle 1 operating history data for Arkansas Nuclear One, Unit-2. Final report

    International Nuclear Information System (INIS)

    Gagne, P.A.

    1981-03-01

    This report contains design and cycle 1 operating data for the Arkansas Nuclear One, Unit-2 nuclear steam supply system. The design data include descriptions of the reactor core, reactor coolant system, and control systems which are a part of the nuclear steam supply system. Operating history data are provided for the period of December 1978 through January 1980. The most important operating history data provided include reactor power, cumulative fuel burnup, control rod position, primary coolant temperature, and a series of power distribution state points

  13. Operationally efficient propulsion system study (OEPSS) data book. Volume 6; Space Transfer Propulsion Operational Efficiency Study Task of OEPSS

    Science.gov (United States)

    Harmon, Timothy J.

    1992-01-01

    This document is the final report for the Space Transfer Propulsion Operational Efficiency Study Task of the Operationally Efficient Propulsion System Study (OEPSS) conducted by the Rocketdyne Division of Rockwell International. This Study task studied, evaluated and identified design concepts and technologies which minimized launch and in-space operations and optimized in-space vehicle propulsion system operability.

  14. Qualitative risk assessment for the 100-HR-3 groundwater operable unit

    Energy Technology Data Exchange (ETDEWEB)

    Vukelich, S.E. [Golder Associates, Inc., Richland, WA (United States)

    1994-09-22

    This report provides the qualitative risk assessment for the 100-HR-3 operable unit on the Hanford Reservation. 100-HR-3 is a ground water unit. The purpose of the QRA at the 100-HR-3 operable unit is to focus on a predefined set of human and environmental exposure scenarios in order to provides sufficient information that will assist the Tri-Party signatories (Washington State Department of Ecology, EPA and US DOE) in making defensible decisions on the necessity of Interim Remedial Measures. Frequent- and occasional-use exposure scenarios are evaluated in the human health risk assessment to provide bounding estimates of risk. The ecological risk assessment consists of an evaluation of the risks to riparian and aquatic receptors which live in or near the Columbia River.

  15. Remedial investigation for the 200-BP-1 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    Buckmaster, M.A.

    1991-01-01

    The Hanford Site, Richland, Washington, contains over 1500 identified waste sites that will be characterized and remediated over the next 30 years. In support of the ''Hanford Federal Facility Agreement and Consent Order,'' the US Department of Energy has initiated a remedial investigation/feasibility study (RI/FS) at the 200-BP-1 operable unit. The 200-BP-1 RI is the first Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) investigation on the Hanford Site that involves drilling into highly radioactive and chemically contaminated soils. The initial phase of the site characterization is oriented toward determining the nature and extent of any contamination present in the vicinity of the 200-BP-1 operable unit. The major focus of the Phase I RI is the drilling and sampling of 10 inactive waste disposal units which received low level radioactive liquid waste

  16. Qualitative risk assessment for the 100-HR-3 groundwater operable unit

    International Nuclear Information System (INIS)

    Vukelich, S.E.

    1994-01-01

    This report provides the qualitative risk assessment for the 100-HR-3 operable unit on the Hanford Reservation. 100-HR-3 is a ground water unit. The purpose of the QRA at the 100-HR-3 operable unit is to focus on a predefined set of human and environmental exposure scenarios in order to provides sufficient information that will assist the Tri-Party signatories (Washington State Department of Ecology, EPA and US DOE) in making defensible decisions on the necessity of Interim Remedial Measures. Frequent- and occasional-use exposure scenarios are evaluated in the human health risk assessment to provide bounding estimates of risk. The ecological risk assessment consists of an evaluation of the risks to riparian and aquatic receptors which live in or near the Columbia River

  17. Operating experience gained during the copper oxide plugging incident in Koeberg unit 1 generator stator

    Energy Technology Data Exchange (ETDEWEB)

    Mellor, S.P.; Matthee, F.W. [ESKOM, Koeberg Nuclear Power Station (South Africa)

    2002-07-01

    In June 1999 Koeberg's unit 1 started to experience adverse operating conditions which were later ascribed to blockages in the hollow conductors of the generator stator. These blockages were attributed to copper oxide plugs which developed progressively during the following year and culminated in reduced power operation. Many attempts were made to address the plugging by implementing various off-line and on-line cleaning processes. Subsequent to a successful on-line cleaning operation, the unit was returned to full power and the chemistry regime for the stator cooling water system was changed to allow for operation at an elevated pH. This paper discusses Koeberg's experience with copper oxide blockages, describes the initial indications of the problem and the impact on the operating parameters. The remainder of the paper focuses on the actions taken to address the deteriorating situation and the different cleaning methods implemented to remove the copper oxide deposits. The paper concludes with the current status of the unit 1 generator stator and the lessons learned during the resolution of this problem. (authors)

  18. Operating experience gained during the copper oxide plugging incident in Koeberg unit 1 generator stator

    International Nuclear Information System (INIS)

    Mellor, S.P.; Matthee, F.W.

    2002-01-01

    In June 1999 Koeberg's unit 1 started to experience adverse operating conditions which were later ascribed to blockages in the hollow conductors of the generator stator. These blockages were attributed to copper oxide plugs which developed progressively during the following year and culminated in reduced power operation. Many attempts were made to address the plugging by implementing various off-line and on-line cleaning processes. Subsequent to a successful on-line cleaning operation, the unit was returned to full power and the chemistry regime for the stator cooling water system was changed to allow for operation at an elevated pH. This paper discusses Koeberg's experience with copper oxide blockages, describes the initial indications of the problem and the impact on the operating parameters. The remainder of the paper focuses on the actions taken to address the deteriorating situation and the different cleaning methods implemented to remove the copper oxide deposits. The paper concludes with the current status of the unit 1 generator stator and the lessons learned during the resolution of this problem. (authors)

  19. Level 1 shutdown and low power operation of Mochovce NPP, Unit 1, Slovakia

    International Nuclear Information System (INIS)

    Halada, P.; Cillik, I.; Stojka, T.; Kuzma, M.; Prochaska, J.; Vrtik, L.

    2004-01-01

    The paper presents general approach, used methods and form of documentation of the results that have been applied within the shutdown and low power PSA (SPSA) study for Mochovce NPP, Unit 1, Slovakia. The SPSA project was realized by VUJE Trnava Inc., Slovakia in 2001-2002 years. The Level 1 SPSA study for Mochovce NPP Unit 1 covers internal events as well as internal (fires, floods and heavy load drop) and external (aircraft crash, extreme meteorological conditions, seismic event and influence of surrounding industry) hazards. Mochovce NPP consists of two operating units equipped with VVER 440/V213 reactors safety upgraded before construction finishing and operation start. 87 safety measures based on VVER 440 operational experience and international mission insights were implemented to enhance its operational and nuclear safety. The SPSA relates to full power PSA (FPSA) as a continuation of the effort to create a harmonized level 1 PSA model for all operational modes of the plant with the goal to use it for further purposes as follows: Real Time Risk Monitor, Maintenance Optimization, Technical Specifications Optimization, Living PSA. (author)

  20. Pilot-scale treatability test plan for the 200-UP-1 groundwater Operable Unit

    International Nuclear Information System (INIS)

    Wittreich, C.D.

    1994-05-01

    This document presents the treatability test plan for pilot-scale pump and treat testing at the 200-UP-1 Operable Unit. This treatability test plan has been prepared in response to an agreement between the US Department of Energy, the US Environmental Protection Agency, and the Washington State Department of Ecology, as documented in Hanford Federal Facility Agreement and Consent Order (Ecology et al. 1989a) Change Control Form M-13-93-03 (Ecology et al. 1994). The agreement also requires that, following completion of the activities described in this test plan, a 200-UP-1 Operable Unit interim remedial measure (IRM) proposed plan be developed for use in preparing an interim action record of decision (ROD). The IRM Proposed Plan will be supported by the results of the testing described in this treatability test plan, as well as by other 200-UP-1 Operable Unit activities (e.g., limited field investigation, development of a qualitative risk assessment). Once issued, the interim action ROD will specify the interim action for groundwater contamination at the 200-UP-1 Operable Unit. The approach discussed in this treatability test plan is to conduct a pilot-scale pump and treat test for the contaminant plume associated with the 200-UP-1 Operable Unit. Primary contaminants of concern are uranium and technetium-99; the secondary contaminant of concern is nitrate. The pilot-scale treatability testing presented in this test plan has as its primary purpose to assess the performance of aboveground treatment systems with respect to the ability to remove the primary contaminants in groundwater withdrawn from the contaminant plume

  1. Pilot-scale treatability test plan for the 200-BP-5 operable unit

    International Nuclear Information System (INIS)

    1994-08-01

    This document presents the treatability test plan for pilot-scale pump and treat testing at the 200-BP-5 Operable Unit. This treatability test plan has been prepared in response to an agreement between the U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology), as documented in Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1989a) Change Control Form M-13-93-03 (Ecology et al. 1994) and a recent 200 NPL Agreement Change Control Form (Appendix A). The agreement also requires that, following completion of the activities described in this test plan, a 200-BP-5 Operable Unit Interim Remedial Measure (IRM) Proposed Plan be developed for use in preparing an Interim Action Record of Decision (ROD). The IRM Proposed Plan will be supported by the results of this treatability test plan, as well as by other 200-BP-5 Operable Unit activities (e.g., development of a qualitative risk assessment). Once issued, the Interim Action ROD will specify the interim action(s) for groundwater contamination at the 200-BP-5 Operable Unit. The treatability test approach is to conduct a pilot-scale pump and treat test for each of the two contaminant plumes associated with the 200-BP-5 Operable Unit. Primary contaminants of concern are 99 Tc and 60 Co for underwater affected by past discharges to the 216-BY Cribs, and 90 Sr, 239/240 Pu, and Cs for groundwater affected by past discharges to the 216-B-5 Reverse Well. The purpose of the pilot-scale treatability testing presented in this testplan is to provide the data basis for preparing an IRM Proposed Plan. To achieve this objective, treatability testing must: Assess the performance of groundwater pumping with respect to the ability to extract a significant amount of the primary contaminant mass present in the two contaminant plumes

  2. Limited field investigation report for the 100-HR-3 operable unit

    International Nuclear Information System (INIS)

    1994-09-01

    This limited field investigation (LFI) was conducted to assess the applicability of interim remedial measures (IRM) for reducing human health and environmental risks within the 100-HR-3 Groundwater Operable Unit. The 100-HR-3 Operable Unit is comprised of three subareas; the 100 D Area, the 100 H Area and those portions of the 600 Area between the two reactor areas. The operable unit is one of seven operable units associated with the 100 D and H Areas. Operable units 100-DR-1, 100-DR-2, 100-DR-3, 100-HR-1, 100-HR-2 and 100-IU-4 address contaminant sources while 100-HR-3 addresses contamination present in the underlying groundwater. The primary method of field investigation used during this LFI was the installation and sampling of monitoring wells. Samples were collected from the groundwater and soils, and submitted for laboratory analysis. Boreholes were surveyed for radiological contamination using downhole geophysical techniques to further delineate the locations and levels of contaminants. All samples were screened to ascertain the presence of volatile organic compounds and radionuclides. Analytical data were subjected to validation; all round one, two and three and a minimum of 10% of round four data associated with the LFI were validated. A screening method was used to identify contaminants of potential concern (COPC). This screening method eliminated from further consideration, constituents that were below background. Constituents which are considered non-toxic to humans were eliminated from the human health evaluation. Data consistency and blank contamination were also evaluated in the screening process. These COPC were then evaluated further in the qualitative risk assessment (QRA). A human health QRA was performed using conservative (maximum equilibrated contaminant levels from the LFI) analyses

  3. Limited field investigation report for the 100-HR-2 Operable Unit

    International Nuclear Information System (INIS)

    1994-09-01

    This report summarizes the data collection and analysis activities conducted during the 100-HR-2 Operable Unit investigative phase and the associated qualitative risk assessment (QRA). The 100-HR-2 Operable Unit contains solid waste burial grounds, an ash pit, bum pits, electrical facilities, septic systems, and support facilities. All known and suspected areas of contamination were classified as solid waste burial grounds or low-priority waste sites based on the collective knowledge of the operable unit managers (representatives from the US Department of Energy [DOE], the US Environmental Protection Agency [EPA], and Washington Department of Ecology [Ecology]) during the preparation of the 100-HR-2 Operable Unit work plan (DOE/RL 1993f). Solid waste burial grounds were judged to pose sufficient risk(s), through one or more pathways, to require evaluation for an interim remedial measure (IRM) as per the Hanford Past-Practice Strategy (HPPS) (DOE/RL 1991) and negotiations with DOE, EPA, and Ecology. An IRM is intended to achieve remedies that are likely to lead to a final record of decision. Low-priority sites are those judged not to pose significant risk to require the streamlined evaluation. There were six low-priority waste sites and seven solid waste burial grounds identified. The investigative phase was conducted in accordance with the RCRA Facility Investigation/Corrective Measures Study Work Plan for the 100-HR-2 Operable Unit (DOE/RL 1993f). The QRA was performed in accordance with the Hanford Site Baseline Risk Assessment Methodology (DOE/RL 1993b) and the recommendations incorporate the strategies of the HPPS. The purpose of this report is to: (1) provide a summary of site investigative activities; (2) refine the conceptual exposure model (as needed); (3) identify chemical- and location-specific corrective action requirements; and (4) provide a human health and ecological QRA associated with solid waste burial grounds

  4. Soil washing physical separations test procedure - 300-FF-1 operable unit

    Energy Technology Data Exchange (ETDEWEB)

    Belden, R.D.

    1993-10-08

    This procedure provides the operations approach, a field sampling plan, and laboratory procedures for a soil washing test to be conducted by Alternative Remedial Technologies, Inc. (ART) in the 300-FF-1 area at the Hanford site. The {open_quotes}Quality Assurance Project Plan for the Soil Washing Physical Separations Test, 300-FF-1 Operable Unit,{close_quotes} Hanford, Washington, Alternative Remedial Technologies, Inc., February 1994 (QAPP) is provided in a separate document that presents the procedural and organizational guidelines for this test. This document describes specifications, responsibilities, and general procedures to be followed to conduct physical separation soil treatability tests in the North Process Pond of the 300-FF-1 Operable Unit (OU) at the Hanford Site. These procedures are based on the {open_quotes}300-FF-1 Physical Separations CERCLA Treatability Test Plan, DOE/RL 92-2l,{close_quotes} (DOE-RL 1993).

  5. Soil washing physical separations test procedure - 300-FF-1 operable unit

    International Nuclear Information System (INIS)

    Belden, R.D.

    1993-01-01

    This procedure provides the operations approach, a field sampling plan, and laboratory procedures for a soil washing test to be conducted by Alternative Remedial Technologies, Inc. (ART) in the 300-FF-1 area at the Hanford site. The open-quotes Quality Assurance Project Plan for the Soil Washing Physical Separations Test, 300-FF-1 Operable Unit,close quotes Hanford, Washington, Alternative Remedial Technologies, Inc., February 1994 (QAPP) is provided in a separate document that presents the procedural and organizational guidelines for this test. This document describes specifications, responsibilities, and general procedures to be followed to conduct physical separation soil treatability tests in the North Process Pond of the 300-FF-1 Operable Unit (OU) at the Hanford Site. These procedures are based on the open-quotes 300-FF-1 Physical Separations CERCLA Treatability Test Plan, DOE/RL 92-2l,close quotes (DOE-RL 1993)

  6. Remedial investigation/feasibility study work plan for the 100-KR-4 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-KR-4 operable unit. The 100-K Area consists of the 100-KR-4 groundwater operable unit and three source operable units. The 100-KR-4 operable unit includes all contamination found in the aquifer soils and water beneath the 100-K Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination

  7. Remedial investigation/feasibility study work plan for the 100-KR-4 operable unit, Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency`s (EPA`s) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-KR-4 operable unit. The 100-K Area consists of the 100-KR-4 groundwater operable unit and three source operable units. The 100-KR-4 operable unit includes all contamination found in the aquifer soils and water beneath the 100-K Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination.

  8. Point Beach Nuclear Plant, Units 1 and 2. Semiannual operating report No. 10, January--June 1975

    International Nuclear Information System (INIS)

    1975-01-01

    Unit 1 operated at an average capacity factor of 65.2 percent with a net efficiency of 31.41 percent. Unit 2 operted at an average capacity factor of 88.6 lpercent with a net efficiency of 32.28 percent. Unit 1 was essentially base loaded while Unit 2 operated on load follow. Information is presented concerning power generation, shutdowns, corrective maintenance, chemistry and radiochemistry, occupational radiation exposure, release of radioactive materials, abnormal occurrences, and environmental monitoring. (FS)

  9. Defining a Hospital Volume Threshold for Minimally Invasive Pancreaticoduodenectomy in the United States

    Science.gov (United States)

    Adam, Mohamed Abdelgadir; Thomas, Samantha; Youngwirth, Linda; Pappas, Theodore; Roman, Sanziana A.

    2016-01-01

    Importance There is increasing interest in expanding use of minimally invasive pancreaticoduodenectomy (MIPD). This procedure is complex, with data suggesting a significant association between hospital volume and outcomes. Objective To determine whether there is an MIPD hospital volume threshold for which patient outcomes could be optimized. Design, Setting, and Participants Adult patients undergoing MIPD were identified from the Healthcare Cost and Utilization Project National Inpatient Sample from 2000 to 2012. Multivariable models with restricted cubic splines were used to identify a hospital volume threshold by plotting annual hospital volume against the adjusted odds of postoperative complications. The current analysis was conducted on August 16, 2016. Main Outcomes and Measures Incidence of any complication. Results Of the 865 patients who underwent MIPD, 474 (55%) were male and the median patient age was 67 years (interquartile range, 59-74 years). Among the patients, 747 (86%) had cancer and 91 (11%) had benign conditions/pancreatitis. Overall, 410 patients (47%) had postoperative complications and 31 (4%) died in-hospital. After adjustment for demographic and clinical characteristics, increasing hospital volume was associated with reduced complications (overall association P < .001); the likelihood of experiencing a complication declined as hospital volume increased up to 22 cases per year (95% CI, 21-23). Median hospital volume was 6 cases per year (range, 1-60). Most patients (n = 717; 83%) underwent the procedure at low-volume (≤22 cases per year) hospitals. After adjustment for patient mix, undergoing MIPD at low- vs high-volume hospitals was significantly associated with increased odds for postoperative complications (odds ratio, 1.74; 95% CI, 1.03-2.94; P = .04). Conclusions and Relevance Hospital volume is significantly associated with improved outcomes from MIPD, with a threshold of 22 cases per year. Most patients undergo MIPD at low-volume

  10. Emergency operating instruction improvements at San Onofre Nuclear Generating Station Units 2 and 3

    International Nuclear Information System (INIS)

    Trillo, M.W.; Smith, B.H.

    1989-01-01

    In late 1987, San Onofre nuclear generating station (SONGS) began an extensive upgrade of the units 2 and 3 emergency operating instructions (EOIs). The original intent of this program was to incorporate revised generic guidance and to correct problems that were identified by operators. While this program was in progress, the US Nuclear Regulatory Commission (NRC) conducted a series of audits of emergency operating procedure (EOP) development and maintenance programs as 16 commercial nuclear facilities in the United States. These audits included four stations with Combustion Engineering-designed nuclear steam supply systems. (One of these audits included a review of preupgrade SONGS units 2 and 3 EOIs.) Significant industrywide comments resulted from these audits. The NRC has stated its intent to continue the review and audit of EOIs and the associated maintenance programs at all US commercial nuclear facilities. The units 2 and 3 EOI upgrade program developed procedural improvements and procedural program maintenance improvements that address many of the existing audit comments that have been received by the industry. Other resulting improvements may be useful in minimizing NRC comments in future such audits. Specific improvements are discussed. The upgrade program resulted in benefits that were not originally anticipated. The results of this program can be of significant use by other utilities in addressing the industrywide concerns that have been raised in recent NRC audits of EOP development and maintenance programs

  11. Operating experience feedback report: Service water system failures and degradations: Volume 3

    International Nuclear Information System (INIS)

    Lam, P.; Leeds, E.

    1988-11-01

    A comprehensive review and evaluation of service water system failures and degradations observed in operating events in light water reactors from 1980 to 1987 has been conducted. The review and evaluation focused on the identification of causes of system failures and degradations, the adequacy of corrective actions implemented and planned, and the safety significance of the operating events. The results of this review and evaluation indicate that the service water system failures and degradations have significant safety implications. These system failures and degradations are attributable to a great variety of causes, and have adverse impact on a large number of safety-related systems and components which are required to mitigate reactor accidents. Specifically, the causes of failures and degradations include various fouling mechanisms (sediment deposition, biofouling, corrosion and erosion, pipe coating failure, calcium carbonate, foreign material and debris intrusion); single failures and other design deficiencies; flooding; multiple equipment failures; personnel and procedural errors; and seismic deficiencies. Systems and components adversely impacted by a service water system failure or degradation include the component cooling water system, emergency diesel generators, emergency core cooling system pumps and heat exchangers, the residual heat removal system, containment spray and fan coolers, control room chillers, and reactor building cooling units. 44 refs., 10 figs., 5 tabs

  12. Remedial investigation/feasibility study work plan for the 100-FR-3 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Figure 1-1 shows the location of these areas. Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-FR-3 operable unit. The 100-K Area consists of the 100-FR-3 groundwater operable unit and two source operable units. The 100-FR-3 operable unit includes all contamination found in the aquifer soils and water beneath the 100-F Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination. A separate work plan has been initiated for the 100-FR-1 source operable unit (DOE-RL 1992a)

  13. Remedial investigation/feasibility study work plan for the 100-FR-1 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-08-01

    Four areas of the Hanford Site (the 100, 200,300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. This work plan and the attached supporting project plans establish the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-FR-1 operable unit. The 100-FR-1 source operable unit is one of two source operable units in the 100-F Area. Source operable units include facilities and unplanned release sites that are potential sources of hazardous substance contamination. The groundwater affected or potentially affected by the entire 100-F Area is considered as a separate operable unit, the 100-FR-3 groundwater operable unit. A separate work plan has been initiated for the 100-FR-3 operable unit (DOE/RL 1992a)

  14. Preventive maintenance basis: Volume 16 -- Power operated relief valves, solenoid actuated. Final report

    International Nuclear Information System (INIS)

    Worledge, D.; Hinchcliffe, G.

    1997-07-01

    US nuclear plants are implementing preventive maintenance (PM) tasks with little documented basis beyond fundamental vendor information to support the tasks or their intervals. The Preventive Maintenance Basis project provides utilities with the technical basis for PM tasks and task intervals associated with 40 specific components such as valves, electric motors, pumps, and HVAC equipment. This report provides an overview of the PM Basis project and describes use of the PM Basis database. This volume 16 of the report provides a program of PM tasks suitable for application to power operated relief valves (PORV's) that are solenoid actuated. The PM tasks that are recommended provide a cost-effective way to intercept the causes and mechanisms that lead to degradation and failure. They can be used, in conjunction with material from other sources, to develop a complete PM program or to improve an existing program. Users of this information will be utility managers, supervisors, craft technicians, and training instructors responsible for developing, optimizing, or fine-tuning PM programs

  15. Surry Power Station, Units 1 and 2. Semiannual operating report, July--December 1974

    International Nuclear Information System (INIS)

    1974-01-01

    Net electric power generated by Surry Unit 1 was 6,930,353 MWH with the generator on line for 10,417.7 hours. Net electric power generated by Unit 2 was 5,699,299 MWH with the generator on line for 8,384.2 hours. Information is presented concerning operation, radioactive effluent releases, solid radioactive wastes, fuel shipments, occurrences in which temperature limitations on the condenser cooling water discharge were exceeded, changes in station organization, occupational personnel radiation exposure, nonradiological monitoring including thermal, physical, and biological programs, and the radiological environmental monitoring program. (U.S.)

  16. Retrofitting and operation solid radwaste system Dresden Station, Units 2 and 3

    International Nuclear Information System (INIS)

    Testa, J.; Homer, J.C.

    1982-01-01

    Units 2 and 3 at Dresden Station are twin 794 MW (net) BWR units that became operational in 1970 and 1971. The waste streams are typical of BWR stations, namely, bead resin and filter sludge (powdered resins and diatomaceous earth), evaporator concentrate containing approximately 25% dissolved solids and dry active waste. The original solid radwaste system utilized cement for solidification in open top 55 gallon drums. Remote handling was provided by means of a monorail with moving platforms supporting the drums. A relatively light-weight compactor was used to compact DAW into 55 gallon drums. Difficulties were experienced with this system

  17. Qualitative risk assessment for the 100-FR-1 source operable unit

    International Nuclear Information System (INIS)

    Corporation, I.T.

    1994-08-01

    This report provides the Qualitative risk assessment (QRA) for the waste sites associated with the 100-FR-1 Operable Unit. The QRA is an evaluation of risk for a predefined set of human and ecological exposure scenarios. It is not intended to replace or be a substitute for a baseline risk assessment. The QRA is streamlined to consider only two human health scenarios (frequent-and occasional-use) with four exposure pathways (soil ingestion, fugitive dust inhalation, inhalation of volatile organics, and external radiation exposure) and a limited ecological evaluation. The use of these scenarios and pathways was agreed to by the 100 Area Tri-Party unit managers

  18. Indian Point Station, Unit 1 and 2. Semiannual operating report No. 24, July--December 1974

    International Nuclear Information System (INIS)

    1975-01-01

    Net electrical power generated by Unit 1 was 519,130 MWH with the reactor critical for 2,400.39 hours and the generator on line for 2,316.14 hours. Unit 2 generated 2,427,828 MWH electrical power, was critical for 3,590.31 hours and the generator was on line for 3,485.41 hours. Operations and maintenance are summarized. Information is presented concerning radioactive effluent releases, occupational personnel radiation protection, primary coolant chemistry, changes, tests, and experiments. Environmental radioactivity is discussed. (U.S.)

  19. Commercial operation and outage experience of ABWR at Kashiwazaki-Kariwa units Nos. 6 and 7

    International Nuclear Information System (INIS)

    Anahara, N.; Yamada, M.; Kataoka, H.

    2000-01-01

    Kashiwazaki-Kariwa Nuclear Power Station Units Nos. 6 and 7, the world's first ABWRs (Advanced Boiling Water Reactor), started commercial operation on November 7, 1996 and July 2, 1997, respectively, and continued their commercial operation with a high capacity factor, low occupational radiation exposure and radioactive waste. Units 6 and 7 were in their 3rd cycle operation until 25th April 1999 and 1st November 1999, respectively. Thermal efficiency was 35.4-35.8% (design thermal efficiency: 34.5%) during these period, demonstrating better performance than that of BWR-5 (design thermal efficiency: 33.4%). Nos. 6 and 7 have experienced 2 annual outages. The first outage of unit No. 6 started on November 20, 1997 and was completed within 61 days (including 6 New Year holidays), and the second outage started on March 13, 1999 and was completed within 44 days. The first annual outage of unit No. 7 started on May 27, 1998, earlier than it would normally have been, to avoid an annual outage during the summer, and was completed within 55 days, and the second outage started on September 18th, 1999 and was completed within 45 days, All annual outages were carried out within a very short time period without any severe malfunctions, including newly designed ABWR systems and equipment. As the first outage in Japan, 55 days is a very short period, despite the fact that the Nos. 6 and 7 are the first ABWRs in the world and the largest capacity units in Japan. The total occupational radiation exposure of No. 6 was 300 man-mSv (1st outage) and 331 man-mSv (2nd outage). That of Unit 7 was 153 man-mSv (1st outage) Those of unit No. 6 were at the same level as those of unit No. 3, which is the latest design 1100MW(e) BWR-5. That of unit No. 7 was the lowest ever at Kashiwazaki-Kariwa nuclear power station. The drums of radioactive waste discharged during the annual outage numbered 54 (1st outage) for No. 6 and 62 (1st outage) for No. 7, which was less than the design target of 100

  20. An analysis of post-traumatic stress symptoms in United States Air Force drone operators.

    Science.gov (United States)

    Chappelle, Wayne; Goodman, Tanya; Reardon, Laura; Thompson, William

    2014-06-01

    Remotely piloted aircraft (RPA), commonly referred to as "drones," have emerged over the past decade as an innovative warfighting tool. Given there is a paucity of empirical research assessing drone operators, the purpose of this study was to assess for the prevalence of PTSD symptoms among this cohort. Of the 1084 United States Air Force (USAF) drone operators that participated, a total of 4.3% endorsed a pattern of symptoms of moderate to extreme level of severity meeting criteria outlined in the Diagnostic and Statistical Manual of Mental Disorders-4th edition. The incidence of PTSD among USAF drone operators in this study was lower than rates of PTSD (10-18%) among military personnel returning from deployment but higher than incidence rates (less than 1%) of USAF drone operators reported in electronic medical records. Although low PTSD rates may be promising, limitations to this study are discussed. Copyright © 2014 Elsevier Ltd. All rights reserved.

  1. RCRA facility investigation/corrective measures study work plan for the 200-UP-2 Operable Unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1993-06-01

    The 200-UP-2 Operable Unit is one of two source operable units at the U Plant Aggregate Area at the Hanford Site. Source operable units include waste management units and unplanned release sites that are potential sources of radioactive and/or hazardous substance contamination. This work plan, while maintaining the title RFI/CMS, presents the background and direction for conducting a limited field investigation in the 200-UP-2 Operable Unit, which is the first part of the process leading to final remedy selection. This report discusses the background, prior recommendations, goals, organization, and quality assurance for the 200-UP-2 Operable Unit Work Plan. The discussion begins with a summary of the regulatory framework and the role of the work plan. The specific recommendations leading into the work plan are then addressed. Next, the goals and organization of the report are discussed. Finally, the quality assurance and supporting documentation are presented

  2. Utility FGD Survey, January--December 1989. Volume 2, Design performance data for operating FGD systems, Part 1

    Energy Technology Data Exchange (ETDEWEB)

    Hance, S.L.; McKibben, R.S.; Jones, F.M. [IT Corp., Cincinnati, OH (United States)

    1992-03-01

    The Utility flue gas desulfurization (FGD) Survey report, which is generated by a computerized data base management system, represents a survey of operational and planned domestic utility flue gas desulfurization (FGD) systems. It summarizes information contributed by the utility industry, system and equipment suppliers, system designers, research organizations, and regulatory agencies. The data cover system design, fuel characteristics, operating history, and actual system performance. Also included is a unit-by-unit discussion of problems and solutions associated with the boilers, scrubbers, and FGD systems. The development status (operational, under construction, or in the planning stages), system supplier, process, waste disposal practice, and regulatory class are tabulated alphabetically by utility company.

  3. Final Report - Advanced MEA's for Enhanced Operating Conditions, Amenable to High Volume Manufacture

    Energy Technology Data Exchange (ETDEWEB)

    Debe, Mark K.

    2007-09-30

    This report summarizes the work completed under a 3M/DOE contract directed at advancing the key fuel cell (FC) components most critical for overcoming the polymer electrolyte membrane fuel cell (PEMFC) performance, durability & cost barriers. This contract focused on the development of advanced ion exchange membranes & electrocatalysts for PEMFCs that will enable operation under ever more demanding automotive operating conditions & the use high volume compatible processes for their manufacture. Higher performing & more durable electrocatalysts must be developed for PEMFCs to meet the power density & lifetime hours required for FC vehicles. At the same time the amount of expensive Pt catalyst must be reduced to lower the MEA costs. While these two properties are met, the catalyst must be made resistant to multiple degradation mechanisms to reach necessary operating lifetimes. In this report, we present the work focused on the development of a completely new approach to PEMFC electrocatalyts, called nanostructured thin film (NSTF) catalysts. The carbon black supports are eliminated with this new approach which eliminates the carbon corrosion issue. The thin film nature of the catalyst significantly improves its robustness against dissolution & grain growth, preserving the surface area. Also, the activity of the NSTF for oxygen reduction is improved by over 500% compared to dispersed Pt catalyts. Finally, the process for fabricating the NSTF catalysts is consistent with high volume roll-good manufacturing & extremely flexible towards the introduction of new catalyst compositions & structures. This report documents the work done to develop new multi-element NSTF catalysts with properties that exceed pure Pt, that are optimized for use with the membranes discussed below, & advance the state-of-the-art towards meeting the DOE 2010 targets for PEMFC electrocatalysts. The work completed advances the understanding of the NSTF catalyst technology, identifies new NSTF

  4. Dose rate evaluation of workers on the operation floor in Fukushima-Daiichi Unit 3

    Science.gov (United States)

    Matsushita, Kaoru; Kurosawa, Masahiko; Shirai, Keisuke; Matsuoka, Ippei; Mukaida, Naoki

    2017-09-01

    At Fukushima Daiichi Nuclear Power Plant Unit 3, installation of a fuel handling machine is planned to support the removal of spent fuel. The dose rates at the workplace were calculated based on the source distribution measured using a collimator in order to confirm that the dose rates on the operation floor were within a manageable range. It was confirmed that the accuracy of the source distribution was C/M = 1.0-2.4. These dose rates were then used to plan the work on the operation floor.

  5. Ageing Management of the reactor internals in Belgian nuclear units in view of Long Term Operation

    International Nuclear Information System (INIS)

    Gerard, R.; Bertolis, D.; Vissers, S.

    2012-01-01

    The reactor internals support the reactor core, distribute the coolant flow through the core, and guide and protect the rod control cluster assemblies and in-core instrumentation. Their integrity must be guaranteed in all operating and accident conditions. They are exposed to specific degradation mechanisms linked to the intense neutron irradiation, like Irradiation Assisted Stress Corrosion Cracking (IASCC) or potentially void swelling, in addition to more classical mechanisms like fatigue, wear and stress corrosion cracking. A rigorous follow-up of in-service degradation and an effective ageing management is therefore of crucial importance and contributes to the safe and economical operation of nuclear PWR units. (author)

  6. Development of in-situ product removal strategies in biocatalysis applying scaled-down unit operations

    DEFF Research Database (Denmark)

    Heintz, Søren; Börner, Tim; Ringborg, Rolf Hoffmeyer

    2017-01-01

    different process steps while operating it as a combined system, giving the possibility to test and characterize the performance of novel process concepts and biocatalysts with minimal influence of inhibitory products. Here the capabilities of performing process development by applying scaled-down unit...... operations are highlighted through a case study investigating the asymmetric synthesis of 1-methyl-3-phenylpropylamine (MPPA) using ω-transaminase, an enzyme in the sub-family of amino transferases (ATAs). An on-line HPLC system was applied to avoid manual sample handling and to semi...

  7. Probabilistic risk assessment of the Space Shuttle. Phase 3: A study of the potential of losing the vehicle during nominal operation. Volume 4: System models and data analysis

    Science.gov (United States)

    Fragola, Joseph R.; Maggio, Gaspare; Frank, Michael V.; Gerez, Luis; Mcfadden, Richard H.; Collins, Erin P.; Ballesio, Jorge; Appignani, Peter L.; Karns, James J.

    1995-01-01

    In this volume, volume 4 (of five volumes), the discussion is focussed on the system models and related data references and has the following subsections: space shuttle main engine, integrated solid rocket booster, orbiter auxiliary power units/hydraulics, and electrical power system.

  8. Integrated operations plan for the MFTF-B Mirror Fusion Test Facility. Volume II. Integrated operations plan

    Energy Technology Data Exchange (ETDEWEB)

    1981-12-01

    This document defines an integrated plan for the operation of the Lawrence Livermore National Laboratory (LLNL) Mirror Fusion Test Facility (MFTF-B). The plan fulfills and further delineates LLNL policies and provides for accomplishing the functions required by the program. This plan specifies the management, operations, maintenance, and engineering support responsibilities. It covers phasing into sustained operations as well as the sustained operations themselves. Administrative and Plant Engineering support, which are now being performed satisfactorily, are not part of this plan unless there are unique needs.

  9. Integrated operations plan for the MFTF-B Mirror Fusion Test Facility. Volume II. Integrated operations plan

    International Nuclear Information System (INIS)

    1981-12-01

    This document defines an integrated plan for the operation of the Lawrence Livermore National Laboratory (LLNL) Mirror Fusion Test Facility (MFTF-B). The plan fulfills and further delineates LLNL policies and provides for accomplishing the functions required by the program. This plan specifies the management, operations, maintenance, and engineering support responsibilities. It covers phasing into sustained operations as well as the sustained operations themselves. Administrative and Plant Engineering support, which are now being performed satisfactorily, are not part of this plan unless there are unique needs

  10. Coordinating bifurcated remediation of soil and groundwater at sites containing multiple operable units

    International Nuclear Information System (INIS)

    Laney, D.F.

    1996-01-01

    On larger and/or more complex sites, remediation of soil and groundwater is sometimes bifurcated. This presents some unique advantages with respect to expedited cleanup of one medium, however, it requires skillful planning and significant forethought to ensure that initial remediation efforts do not preclude some long-term options, and/or unduly influence the subsequent selection of a technology for the other operable units and/or media. this paper examines how the decision to bifurcate should be approached, the various methods of bifurcation, the advantages and disadvantages of bifurcation, and the best methods to build flexibility into the design of initial remediation systems so as to allow for consideration of a fuller range of options for remediation of other operable units and/or media at a later time. Pollutants of concern include: metals; petroleum hydrocarbons; and chlorinated solvents

  11. Steam generator tube integrity requirements and operating experience in the United States

    International Nuclear Information System (INIS)

    Karwoski, K.J.

    2009-01-01

    Steam generator tube integrity is important to the safe operation of pressurized-water reactors. For ensuring tube integrity, the U.S. Nuclear Regulatory Commission uses a regulatory framework that is largely performance based. This performance-based framework is supplemented with some prescriptive requirements. The framework recognizes that there are three combinations of tube materials and heat treatments currently used in the United States and that the operating experience depends, in part, on the type of material used. This paper summarizes the regulatory framework for ensuring steam generator tube integrity, it highlights the current status of steam generators, and it highlights some of the steam generator issues and challenges that exist in the United States. (author)

  12. Groundwater Monitoring Plan for the Reactor Technology Complex Operable Unit 2-13

    International Nuclear Information System (INIS)

    Richard P. Wells

    2007-01-01

    This Groundwater Monitoring Plan describes the objectives, activities, and assessments that will be performed to support the on-going groundwater monitoring requirements at the Reactor Technology Complex, formerly the Test Reactor Area (TRA). The requirements for groundwater monitoring were stipulated in the Final Record of Decision for Test Reactor Area, Operable Unit 2-13, signed in December 1997. The monitoring requirements were modified by the First Five-Year Review Report for the Test Reactor Area, Operable Unit 2-13, at the Idaho National Engineering and Environmental Laboratory to focus on those contaminants of concern that warrant continued surveillance, including chromium, tritium, strontium-90, and cobalt-60. Based upon recommendations provided in the Annual Groundwater Monitoring Status Report for 2006, the groundwater monitoring frequency was reduced to annually from twice a year

  13. Development of Regulatory Audit Programs for Wolsong Unit 1 Continued Operation

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Hong Key; Nho, Seung Hwan; Song, Myung Ho [Korea Institute of Nuclear Safety, Daejeon (Korea, Republic of)

    2012-05-15

    Wolsong Unit 1 (PHWR type) design life expires on November 20, 2010. In relation to it, KHNP submitted its application to get approval of the MEST on December 30, 2009 and KINS is under review to confirm the appropriateness of continued operation. For the comprehensive review of Wolsong Unit 1 continued operation, KINS has developed the review guidelines for PHWR type reactor including a total of 39 aging management program (AMP) items and 7 time limited aging analysis (TLAA) items. Evaluations or calculations to verify the integrity of nuclear components are required for plant specific AMP and TLAA items as well as the ones specified in the guidelines. In this paper, audit calculation programs developed for KINS staff use in reviewing applicant's submitted evaluation results are presented

  14. Computer Drawing Method for Operating Characteristic Curve of PV Power Plant Array Unit

    Science.gov (United States)

    Tan, Jianbin

    2018-02-01

    According to the engineering design of large-scale grid-connected photovoltaic power stations and the research and development of many simulation and analysis systems, it is necessary to draw a good computer graphics of the operating characteristic curves of photovoltaic array elements and to propose a good segmentation non-linear interpolation algorithm. In the calculation method, Component performance parameters as the main design basis, the computer can get 5 PV module performances. At the same time, combined with the PV array series and parallel connection, the computer drawing of the performance curve of the PV array unit can be realized. At the same time, the specific data onto the module of PV development software can be calculated, and the good operation of PV array unit can be improved on practical application.

  15. Trends in lumber processing in the western United States. Part I: board foot Scribner volume per cubic foot of timber

    Science.gov (United States)

    Charles E. Keegan; Todd A. Morgan; Keith A. Blatner; Jean M. Daniels

    2010-01-01

    This article describes trends in board foot Scribner volume per cubic foot of timber for logs processed by sawmills in the western United States. Board foot to cubic foot (BF/CF) ratios for the period from 2000 through 2006 ranged from 3.70 in Montana to 5.71 in the Four Corners Region (Arizona, Colorado, New Mexico, and Utah). Sawmills in the Four Corners Region,...

  16. Main problems experienced on diesel generators of French 900 MWe operating units

    Energy Technology Data Exchange (ETDEWEB)

    Dredemis, Geoffroy; Jude, Francois [Commissariat a l' Energie Atomique, centre d' Etudes Nucleaires de Fontenay-aux-Roses, Institut de Protection et Surete Nucleaire, Departement d' Analyse de Surete, B.P. No. 6, 92260 Fontenay-aux-Roses (France)

    1986-02-15

    Each unit of all the French nuclear power plant is equipped with two diesel emergency generator sets., For the totality of standards PWRs of 900 MWe, they are identical. We present in this communication the most significative failures met with diesel engines on operating units, such as rupture of fuel injection pipes, breaking of the connecting rods, and cylinder lubrication failures. All these incidents, which affected the emergency power sources of concerned units, had generic characteristics. In view of their potential consequences, it was proceeded in each case to an immediate control of the components concerned of all PWR 900 MWe diesel engines. At the same time, studies were started as to what modifications would permit to solve rapidly each one of the problems met with. (authors)

  17. Start up and commercial operation of Laguna Verde nuclear power plant. Unit 1

    International Nuclear Information System (INIS)

    Torres Ramirez, J.F.

    1991-01-01

    Prior to start up of Laguna Verde nuclear power plant preoperational tests and start tests were performed and they are described in its more eminent aspects. In relation to commercial operation of nuclear station a series of indicator were set to which allow the measurement of performance in unit 1, in areas of plant efficiency and personal safety. Antecedents. Laguna Verde station is located in Alto Lucero municipality in Veracruz state, 70 kilometers north-northeast from port of Veracruz and a 290 kilometers east-northeast from Mexico city. The station consist of two units manufactured by General Electric, with a nuclear system of vapor supply also called boiling water (BWR/5), and with a system turbine-generator manufactured by Mitsubishi. Each unit has a nominal power of 1931 MWt and a level design power of 675 Mwe and a net power of 654 Electric Megawatts

  18. 200-ZP-1 operable unit borehole summary report for FY 1995 and FY 1996

    International Nuclear Information System (INIS)

    Darrach, M.E.

    1996-10-01

    This document details the well construction, sampling, analyses, and geologic character of the Ringold Formation fluvial unit E gravels as encountered in 16 boreholes in the 200-ZP-1 Operable Unit. These boreholes were drilled by Water Development Hanford Corporation during fiscal years 1995 and 1996. Two of the sixteen boreholes were abandoned; the remaining 14 boreholes were completed as functioning production and compliance wells. The borehole logs and well summary sheets included as Appendices A and B of this document, respectively, depict and describe the vadose zone stratigraphic units encountered during the course of drilling. Appendix C contains the results of sieve analyses conducted on samples obtained via resonant sonic coring and standard split-spoon methods. The sieve analyses were the driver behind the majority of the well designs. Also, for completeness, Appendices D and E contain the well design calculations and the well development process

  19. Aquatic studies at the 100-HR-3 and 100-NR-1 operable units

    International Nuclear Information System (INIS)

    Cushing, C.E.

    1993-04-01

    Pacific Northwest Laboratory initiated a program to characterize selected aquatic biological populations to determine (1) existing levels of inorganic chemical and radionuclide contamination, and (2) the populations' suitability as indicators of chemical releases during cleanup activities at the US Department of Energy's Hanford Site. Following work plans for the ground-water operable units, lower trophic levels in the aquatic habitat (periphyton and caddisfly larvae) were evaluated for contaminants at the 100-HR-3 Operable Unit and 100-NR-1 Operable Unit. The results were evaluated to determine the need for further sampling. If the results showed no significant contamination compared to upriver levels, sampling would be discontinued. The periphyton community appears to be suitable for determining contamination levels. Baseline concentrations for stable chromium were established and will be useful for comparing samples collected when contaminant release is expected. Concentrations of 60 Co, 90 Sr, and 137 Cs in periphyton were essentially below detectable limits, which will also make this community useful in detecting potential releases of radionuclides during cleanup activities. Levels for both stable chromium and radionuclides were essentially below detection limits for caddisfly larvae. Thus, these organisms may be used to monitor suspected contaminant releases from cleanup activities; if concentrations exceed detection limits, they may be related to these activities. Two candidate threatened and endangered species of molluscs occur in the Hanford Reach of the Columbia River. These are the shortface lanx (Fisherola nuttalli), which is a Washington State candidate species, and the Columbia pebblesnail (Fluminicola columbiana), which is both a state and federal candidate species. Specimens of the shortface lanx were observed in the vicinity of N Springs (100-NR-1 Operable Unit); they likely occur throughout this area

  20. Condition based monitoring, diagnosis and maintenance on operating equipments of a hydraulic generator unit

    International Nuclear Information System (INIS)

    Liu, X T; Feng, F Z; Si, A W

    2012-01-01

    According to performance characteristics of operating equipments in a hydraulic generator unit (HGU), the relative techniques on condition monitoring and fault diagnosis (CMFD) are introduced in this paper, especially the key technologies are emphasized, such as equipment monitoring, expert system (ES), intelligent diagnosis and condition based maintenance (CBM). Meanwhile, according to the instructor on CBM proposed by State electric power corporation, based on integrated mode, the main steps on implementation of CBM are discussed in this paper.

  1. INEL Operable Unit 7-13 containment and stabilization configuration option

    International Nuclear Information System (INIS)

    Raivo, B.D.; Richardson, J.G.; Nickelson, D.F.

    1993-05-01

    A containment and stabilization configuration option has been developed for the Idaho National Engineering Laboratory's Subsurface Disposal Area Operable Unit 7-13, the transuranic (TRU)-contaminated waste pits and trenches. The configuration option is presented as an end-to-end system block diagram. Functional subelements are separately discussed, and technical background information, assumptions, input, high-level subelement requirements, and output are presented for each option

  2. Baseline groundwater model update for p-area groundwater operable unit, NBN

    Energy Technology Data Exchange (ETDEWEB)

    Ross, J. [Savannah River Site (SRS), Aiken, SC (United States); Amidon, M. [Savannah River Site (SRS), Aiken, SC (United States)

    2015-09-01

    This report documents the development of a numerical groundwater flow and transport model of the hydrogeologic system of the P-Area Reactor Groundwater Operable Unit at the Savannah River Site (SRS) (Figure 1-1). The P-Area model provides a tool to aid in understanding the hydrologic and geochemical processes that control the development and migration of the current tritium, tetrachloroethene (PCE), and trichloroethene (TCE) plumes in this region.

  3. Black Fox Station, Units 1 and 2. Application for construction permits and operating licenses

    International Nuclear Information System (INIS)

    1975-01-01

    An application to construct and operate Black Fox Station, Units 1 and 2, is presented. The two BWR type reactors will have a rated core thermal power of 3579 MW(t) and a net electrical power of approximately 1150 MW(e). The facility will be located in Inola Township, 23 miles east of Tulsa on the east side of the Verdigris River in Rogers County, Oklahoma

  4. The new local control systems for operating gaseous diffusion plant units at Pierrelatte

    International Nuclear Information System (INIS)

    Delacroix, C.

    1990-01-01

    The development of a local control network for operating gaseous diffusion plant units is presented. The objective of the control system up date was to replace all the information network hardware. The new generation HP1000 calculators and a network architecture were chosen. The validation tests performed in laboratory and in situ, and the management policies towards the personnel during the technical changes are summarized [fr

  5. Limited field investigation report for the 100-HR-2 Operable Unit

    International Nuclear Information System (INIS)

    1995-07-01

    This report summarizes the data collection and analysis activities conducted during the 100-HR-2 Operable Unit investigative phase and the associated qualitative risk assessment. The 100-HR-2 Operable Unit contains solid waste burial grounds, an ash pit, burn pits, electrical facilities, septic systems, and support facilities. All known and suspected areas of contamination were classified as solid waste burial grounds or low-priority waste sites based on the collective knowledge of the operable unit managers (representatives from the US Department of Energy, the US Environmental Protection Agency, and Washington State Department of Ecology during the preparation of the 100-HR-2 Operable Unit Work Plan (DOE-RL 1993f). Solid waste burial grounds were judged to pose sufficient risk(s), through one or more pathways, to require evaluation for an interim remedial measure as per the Hanford Past-Practice Strategy (DOE-RL 1991) and negotiations with the Department of Energy, US Environmental Protection Agency, and Washington State Department of Ecology. An interim remedial measure is intended to achieve remedies that are likely to lead to a final record of decision. Low-priority sites are those judged not to pose significant risk to require the streamlined evaluation. There were six low-priority waste sites and seven solid waste burial grounds identified. The purpose of this report is to: (1) provide a summary of site investigative activities; (2) refine the conceptual exposure model (as needed); (3) identify chemical- and location-specific corrective action requirements; and 4) provide a human health and ecological QRA associated with solid waste burial grounds

  6. Site-specific waste management instruction for the 100-KR-4 Operable Unit drilling

    International Nuclear Information System (INIS)

    Hadley, J.T.

    1996-07-01

    This site-specific waste management instruction provides guidance for the management of waste generated as a result of groundwater well installations in the 100-KR-4 Operable Unit (OU). The well installations are necessary to implement the Remedial Action (RA) option (pump-and-treat using ion exchange) to prevent discharge of hexavalent chromium at levels above those considered protective of aquatic life in the Columbia River and riverbed sediments

  7. Site-specific waste management instruction for the 100-KR-4 Operable Unit drilling. Revision 1

    International Nuclear Information System (INIS)

    Hadley, J.T.

    1996-08-01

    This site-specific waste management instruction provides guidance for the management of waste generated as a result of groundwater well installations in the 100-KR-4 Operable Unit (OU). The well installations are necessary to implement the Remedial Action (RA) option (pump-and-treat using ion exchange) to prevent discharge of hexavalent chromium at levels above those considered protective of aquatic life in the Columbia River and riverbed sediments

  8. Data validation report for the 100-HR-3 Operable Unit, fifth round groundwater samples

    International Nuclear Information System (INIS)

    Vukelich, S.E.

    1994-01-01

    The data from the chemical analysis of 68 samples from the 100-HR-3 Operable Unit Third Quarter 1993 Groundwater Sampling Investigation and their related quality assurance samples were reviewed and validated to verify that reported sample results were of sufficient quality to support decisions regarding remedial actions performed at the site. Sample analysis included inorganics and general chemical parameters. Fifty three samples were validated for radiochemical parameters

  9. Data validation report for the 100-KR-4 operable unit first quarter, 1994

    International Nuclear Information System (INIS)

    Krug, A.D.

    1994-01-01

    Samples were obtained from the 100-KR-4 Operable Unit first Quarter 1994 Groundwater Sampling event. The data from the chemical analysis of fifty-eight samples from this sampling event and their related quality assurance samples were reviewed and validated to verify that reported samples results were of sufficient quality to support decisions regarding remedial actions performed at this site. Information fro the sampling event and the information validation processes are presented in this document

  10. Data validation report for the 100-D Ponds Operable Unit: 100-D ponds sampling

    International Nuclear Information System (INIS)

    Stankovich, M.T.

    1994-01-01

    Westinghouse-Hanford has requested that 100 percent of the Sample Delivery Groups be validated for the 100-D Ponds Operable Unit Sampling Investigation. Therefore the data from the chemical analysis of all 30 samples from this sampling event and their related quality assurance samples were reviewed and validated to verify that reported sample results were of sufficient quality to support decisions regarding remedial actions performed at this site

  11. Data validation summary report for the 100-BC-5 Operable Unit Round 8 Groundwater Sampling

    International Nuclear Information System (INIS)

    Kearney, A.T.

    1996-03-01

    The information provided in this validation summary report includes data from the chemical analyses of samples from the 100-BC-5 Operable Unit Round 8 Groundwater Sampling Investigation. All of the data from this sampling event and their related quality assurance samples were reviewed and validated to verify that the reported sample results were of sufficient quality to support decisions regarding remedial actions performed at this site. Sample analyses included metals, general chemistry and radiochemistry

  12. Contaminant Attenuation and Transport Characterization of 200-DV-1 Operable Unit Sediment Samples

    Energy Technology Data Exchange (ETDEWEB)

    Truex, Michael J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Szecsody, James E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Qafoku, Nikolla [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Strickland, Christopher E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Moran, James J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Lee, Brady D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Snyder, Michelle M.V. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Lawter, Amanda R. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Resch, Charles T. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Gartman, Brandy N. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Zhong, Lirong [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Nims, Megan K. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Saunders, Danielle L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Williams, Benjamin D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Horner, Jacob A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Leavy, Ian I. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Baum, Steven R. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Christiansen, Beren B. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Clayton, Ray E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); McElroy, Erin M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Appriou, Delphine [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Tyrrell, Kimberly J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Striluk, Miranda L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2017-05-15

    A laboratory study was conducted to quantify contaminant attenuation processes and associated contaminant transport parameters that are needed to evaluate transport of contaminants through the vadose zone to the groundwater. The laboratory study information, in conjunction with transport analyses, can be used as input to evaluate the feasibility of Monitored Natural Attenuation and other remedies for the 200-DV-1 Operable Unit at the Hanford Site.

  13. Initial closed operation of the CELSS Test Facility Engineering Development Unit

    Science.gov (United States)

    Kliss, M.; Blackwell, C.; Zografos, A.; Drews, M.; MacElroy, R.; McKenna, R.; Heyenga, A. G.

    2003-01-01

    As part of the NASA Advanced Life Support Flight Program, a Controlled Ecological Life Support System (CELSS) Test Facility Engineering Development Unit has been constructed and is undergoing initial operational testing at NASA Ames Research Center. The Engineering Development Unit (EDU) is a tightly closed, stringently controlled, ground-based testbed which provides a broad range of environmental conditions under which a variety of CELSS higher plant crops can be grown. Although the EDU was developed primarily to provide near-term engineering data and a realistic determination of the subsystem and system requirements necessary for the fabrication of a comparable flight unit, the EDU has also provided a means to evaluate plant crop productivity and physiology under controlled conditions. This paper describes the initial closed operational testing of the EDU, with emphasis on the hardware performance capabilities. Measured performance data during a 28-day closed operation period are compared with the specified functional requirements, and an example of inferring crop growth parameters from the test data is presented. Plans for future science and technology testing are also discussed. Published by Elsevier Science Ltd on behalf of COSPAR.

  14. Final record of decision for remedial actions at Operable Unit 4

    International Nuclear Information System (INIS)

    1994-12-01

    This decision document presents the selected remedial action for Operable Unit 4 of the Fernald Site in Fernald, Ohio. This remedial action was selected in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA), and to the extent practicable 40 Code of Federal Regulations (CFR) Part 300, the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). For Operable Unit 4 at the FEMP, DOE has chosen to complete an integrated CERCLA/NEPA process. This decision was based on the longstanding interest on the part of local stakeholders to prepare an Environmental Impact Statement (EIS) on the restoration activities at the FEMP and on the recognition that the draft document was issued and public comments received. Therefore, this single document is intended to serve as DOE's Record of Decision (ROD) for Operable Unit 4 under both CERCLA and NEPA; however, it is not the intent of the DOE to make a statement on the legal applicability of NEPA to CERCLA actions

  15. Enhanced teaching and student learning through a simulator-based course in chemical unit operations design

    Science.gov (United States)

    Ghasem, Nayef

    2016-07-01

    This paper illustrates a teaching technique used in computer applications in chemical engineering employed for designing various unit operation processes, where the students learn about unit operations by designing them. The aim of the course is not to teach design, but rather to teach the fundamentals and the function of unit operation processes through simulators. A case study presenting the teaching method was evaluated using student surveys and faculty assessments, which were designed to measure the quality and effectiveness of the teaching method. The results of the questionnaire conclusively demonstrate that this method is an extremely efficient way of teaching a simulator-based course. In addition to that, this teaching method can easily be generalised and used in other courses. A student's final mark is determined by a combination of in-class assessments conducted based on cooperative and peer learning, progress tests and a final exam. Results revealed that peer learning can improve the overall quality of student learning and enhance student understanding.

  16. 100-HR-1 Operable Unit focused feasibility study report. Draft A

    International Nuclear Information System (INIS)

    1994-09-01

    The standard Comprehensive Environmental Response, Compensation, and Liability Act of 1980 Feasibility Study (FS) includes development and screening of alternatives (phases 1 and 2) and the detailed analysis of alternatives (phase 3). This focused feasibility study (FFS) constitutes the phase 3 portion of the FS process. The FFS process is conducted in two stages, a Process Document (DOE-RL 1994a) and an operable unit-specific FFS document, such as this one. The FFS process is performed by implementing a ''plug-in'' style approach as defined in great detail in the Process Document. The objective of this operable unit-specific FFS is to provide decision makers with sufficient information to allow appropriate and timely selection of interim remedial measures (IRM) for sites associated with the 100-HR-1 Operable Unit. The IRM candidate waste sites are determined in the limited field investigation. Site profiles are developed for each of these waste sites. The site profiles are used in the application of the plug-in approach. The waste site either plugs into the analysis of the alternatives for the group, or deviations from the developed group alternatives are described and documented

  17. Complications as indicators of quality assurance after 401 consecutive colorectal cancer resections: the importance of surgeon volume in developing colorectal cancer units in India

    Directory of Open Access Journals (Sweden)

    Shetty Guruprasad S

    2012-01-01

    Full Text Available Abstract Background The low incidence of colorectal cancer in India, coupled with absence of specialized units, contribute to lack of relevant data arising from the subcontinent. We evaluated the data of the senior author to better define the requirements that would enable development of specialized units in a country where colorectal cancer burden is increasing. Methods We retrospectively analyzed data of 401 consecutive colorectal resections from a prospective database of the senior author. In addition to patient demographics and types of resections, perioperative data like intraoperative blood loss, duration of surgery, complications, re-operation rates and hospital stay were recorded and analyzed. Results The median age was 52 years (10-86 years. 279 were males and 122 were females. The average duration of surgery was 220.32 minutes (range 50 - 480 min. The overall complication rate was 12.2% (49/401 with a 1.2% (5/401 mortality rate. The patients having complications had an increase in their median hospital stay (from 10.5 days to 23.4 days and the re-operation rate in them was 51%. The major complications were anastomotic leaks (2.5% and stoma related complications (2.7%. Conclusions This largest ever series from India compares favorably with global standards. In a nation where colorectal cancer is on the rise, it is imperative that high volume centers develop specialized units to train future specialist colorectal surgeons. This would ensure improved quality assurance and delivery of health care even to outreach, low volume centers.

  18. Remedial Investigation/Feasibility Study, Operable Unit 5, Elmendorf AFB, Anchorage, Alaska. Volume 1. Text

    Science.gov (United States)

    1994-03-04

    the protective steel casing to hold it in place and proec the surface seal. Protective steel boilards set in concrete were installed around monitorig ...banks, high watermarks, channel morphology, and canopy cover (Appendix J, Table 1.3). Weather Comdltlaos This assessment included approximate cloud

  19. United States Air Force F-35A Operational Basing Environmental Impact Statement. Volume 1

    Science.gov (United States)

    2013-09-01

    wildlife, domestic animals, natural soundscapes , and outdoor recreation. Each of these effects can be difficult to assess because of limited research...concerns can include effects to wildlife, domestic animals, natural soundscapes , and outdoor recreation. Each of these effects can be difficult to...population centers. In these areas, public concerns can include effects to wildlife, domestic animals, natural soundscapes , and outdoor recreation

  20. United States Air Force F-35A Operational Basing Environmental Impact Statement. Volume 2, Appendices

    Science.gov (United States)

    2013-09-01

    the natural soundscapes of parks consistent with our Management Policies. NPS Management Policies, Section 4.9, Soundscape Management, states “the...Department will restore to the natural condition wherever possible those park soundscapes that have become degraded by unnatural sounds (noise...and will protect natural soundscapes from unacceptable impacts.” This is consistent with 40 CFR. §1508-27b, “Unique characteristics of the geographic

  1. History of Operations Research in the United States Army, Volume 1: 1942-1962

    Science.gov (United States)

    2006-11-08

    Marcellus or- dered that its citizens be spared, but Archimedes was killed by an impatient Roman soldier who failed to recognize him. Archimedes...expense of three millions, has killed 150 Yankees this campaign which is £20,000 a head. And at Bunker’s Hill, she gained a mile of ground half of...which she lost by our taking post on Ploughed Hill. During the same time 60,000 children have been born in America. From these data any mathematical

  2. Impact of spinal anaesthesia on peri-operative lung volumes in obese and morbidly obese female patients.

    Science.gov (United States)

    Regli, A; von Ungern-Sternberg, B S; Reber, A; Schneider, M C

    2006-03-01

    Although obesity predisposes to postoperative pulmonary complications, data on the relationship between body mass index (BMI) and peri-operative respiratory performance are limited. We prospectively studied the impact of spinal anaesthesia, obesity and vaginal surgery on lung volumes measured by spirometry in 28 patients with BMI 30-40 kg.m(-2) and in 13 patients with BMI > or = 40 kg.m(-2). Vital capacity, forced vital capacity, forced expiratory volume in 1 s, mid-expiratory and peak expiratory flows were measured during the pre-operative visit (baseline), after effective spinal anaesthesia with premedication, and after the operation at 20 min, 1 h, 2 h, and 3 h (after mobilisation). Spinal anaesthesia and premedication were associated with a significant decrease in spirometric parameters. Spinal anaesthesia and premedication were associated with a significant decrease in spirometric parameters; mean (SD) vital capacities were - 19% (6.4) in patients with BMI 30-40 kg.m(-2) and - 33% (9.0) in patients with BMI > 40 kg.m(-2). The decrease of lung volumes remained constant for 2 h, whereas 3 h after the operation and after mobilisation, spirometric parameters significantly improved in all patients. This study showed that both spinal anaesthesia and obesity significantly impaired peri-operative respiratory function.

  3. Intermediate photovoltaic system application experiment operational performance report. Volume 6 for Beverly High School, Beverly, MA

    Energy Technology Data Exchange (ETDEWEB)

    1982-03-01

    Performance data are given for the month of February, 1982 for a photovoltaic power supply at a Massachusetts high school. Data given include: monthly and daily electrical energy yield; monthly and daily insolation; monthly and daily array efficiency; energy production as a function of power level, voltage, cell temperature, and hour of day; insolation as a function of hour of the day; input, output and efficiency for each of two power conditioning units and for the total power conditioning system; energy supplied to the load by the photovoltaic system and by the grid; photovoltaic system efficiency; dollar value of the energy supplied by the photovoltaic system; capacity factor; daily photovoltaic energy to load; daily system availability and hours of daylight; heating and cooling degree days; hourly cell temperature, ambient temperature, wind speed, and insolation; average monthly wind speed; wind direction distribution; and daily data acquisition mode and recording interval plot. Also included are four site event report summaries, one involving hardware/maintenance for a power conditioning inverter, and the other three involving operations. (LEW)

  4. Intermediate photovoltaic system application experiment operational performance report. Volume 5 for Beverly High School, Beverly, MA

    Energy Technology Data Exchange (ETDEWEB)

    1982-02-01

    Performance data are presented for the month of January, 1982 for a grid-connected photovoltaic power supply at a Massachusetts high school. Data presented include: monthly and daily electrical energy produced; monthly and daily solar energy incident on the array; monthly and daily array efficiency; plots of energy produced as a function of power level, voltage, cell temperature and time of day; power conditioner input, output and efficiency for each of two individual units and for the total power conditioning system; photovoltaic system efficiency; capacity factor; PV system to load and grid to load energies and corresponding dollar values; daily energy supplied to the load by the PV system; daily PV system availability; monthly and hourly insolation; monthly and hourly temperature average; monthly and hourly wind speed; wind direction distribution; average heating and cooling degree days; number of freeze/thaw cycles; and the data acquisition mode and recording interval plot. Also included are summaries of two problems with the operating data acquisition system. (LEW)

  5. Renewable Electricity Futures Study. Volume 4: Bulk Electric Power Systems: Operations and Transmission Planning

    Energy Technology Data Exchange (ETDEWEB)

    Milligan, M.; Ela, E.; Hein, J.; Schneider, T.; Brinkman, G.; Denholm, P.

    2012-06-01

    The Renewable Electricity Futures (RE Futures) Study investigated the challenges and impacts of achieving very high renewable electricity generation levels in the contiguous United States by 2050. The analysis focused on the sufficiency of the geographically diverse U.S. renewable resources to meet electricity demand over future decades, the hourly operational characteristics of the U.S. grid with high levels of variable wind and solar generation, and the potential implications of deploying high levels of renewables in the future. RE Futures focused on technical aspects of high penetration of renewable electricity; it did not focus on how to achieve such a future through policy or other measures. Given the inherent uncertainties involved with analyzing alternative long-term energy futures as well as the multiple pathways that might be taken to achieve higher levels of renewable electricity supply, RE Futures explored a range of scenarios to investigate and compare the impacts of renewable electricity penetration levels (30%-90%), future technology performance improvements, potential constraints to renewable electricity development, and future electricity demand growth assumptions. RE Futures was led by the National Renewable Energy Laboratory (NREL) and the Massachusetts Institute of Technology (MIT).

  6. Renewable Electricity Futures Study. Volume 4: Bulk Electric Power Systems. Operations and Transmission Planning

    Energy Technology Data Exchange (ETDEWEB)

    Milligan, Michael [National Renewable Energy Lab. (NREL), Golden, CO (United States); Ela, Erik [National Renewable Energy Lab. (NREL), Golden, CO (United States); Hein, Jeff [National Renewable Energy Lab. (NREL), Golden, CO (United States); Schneider, Thomas [National Renewable Energy Lab. (NREL), Golden, CO (United States); Brinkman, Gregory [National Renewable Energy Lab. (NREL), Golden, CO (United States); Denholm, Paul [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2012-06-15

    The Renewable Electricity Futures (RE Futures) Study investigated the challenges and impacts of achieving very high renewable electricity generation levels in the contiguous United States by 2050. The analysis focused on the sufficiency of the geographically diverse U.S. renewable resources to meet electricity demand over future decades, the hourly operational characteristics of the U.S. grid with high levels of variable wind and solar generation, and the potential implications of deploying high levels of renewables in the future. RE Futures focused on technical aspects of high penetration of renewable electricity; it did not focus on how to achieve such a future through policy or other measures. Given the inherent uncertainties involved with analyzing alternative long-term energy futures as well as the multiple pathways that might be taken to achieve higher levels of renewable electricity supply, RE Futures explored a range of scenarios to investigate and compare the impacts of renewable electricity penetration levels (30%–90%), future technology performance improvements, potential constraints to renewable electricity development, and future electricity demand growth assumptions. RE Futures was led by the National Renewable Energy Laboratory (NREL) and the Massachusetts Institute of Technology (MIT). Learn more at the RE Futures website. http://www.nrel.gov/analysis/re_futures/

  7. Water level measurements for modeling hydraulic properties in the 300-FF-5 and 100 Aggregate Area Operable units

    International Nuclear Information System (INIS)

    Campbell, M.D.; McMahon, W.J.; Simpson, K.R.

    1993-04-01

    Pressure transducers connected to dataloggers were used to measure ground water and Columbia River water elevations simultaneously and hourly at 35 locations in the 300-FF-5 Operable Unit and 16 locations in the 100 Aggregate Area Operable Unit on the Hanford Site. Water temperatures were also measured at 12 of these locations. This report details the findings of these studies

  8. 40 CFR 60.1200 - What are the operating practice requirements for my municipal waste combustion unit?

    Science.gov (United States)

    2010-07-01

    ... requirements for my municipal waste combustion unit? 60.1200 Section 60.1200 Protection of Environment... SOURCES Standards of Performance for Small Municipal Waste Combustion Units for Which Construction is... Good Combustion Practices: Operating Requirements § 60.1200 What are the operating practice...

  9. Development of a processor embedded timing unit for the synchronized operation in KSTAR

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Woongryol, E-mail: wrlee@nfri.re.kr; Lee, Taegu; Hong, Jaesic

    2016-11-15

    Highlights: • Timing board for the synchronized tokamak operation. • Processor embedded distributed control system. • Single clock source and multiple trigger signal for the plasma diagnostics. • Delay compensation among the distributed timing boards. - Abstract: The Local Timing Unit (LTU) in KSTAR provides a single clock source and multiple trigger signals with flexible configuration. Over the past seven years, the LTU had a mechanical redesign and several firmware updates for the purpose of provision of a robust operation and precision timing signal. Now we have developed a third version of a local timing unit which has a standalone operation capability. The LTU is built in a cabinet mountable 1U PIZZA box and provides twelve signal output ports, a packet mirroring interface, and an LCD interface panel. The core functions of the LTU are implemented in a Field Programmable Gate Array (FPGA) which has an internal hardcore processor. The internal processor allows the use of Linux Operating System (OS) and the Experimental Physics and Industrial Control System (EPICS). All user level application functions are controllable through the EPICS, however the time critical internal functions are performed by the FPGA logic blocks same as the previous version. The new LTU provides pluggable output module so that we can easily extend the signal output port. The easy installation and effective replacement reduce the efforts of maintenance. This paper describes design, development, and commissioning results of the new KSTAR LTU.

  10. PREMATH: a Precious-Material Holdup Estimator for unit operations and chemical processes

    International Nuclear Information System (INIS)

    Krichinsky, A.M.; Bruns, D.D.

    1982-01-01

    A computer program, PREMATH (Precious Material Holdup Estimator), has been developed to permit inventory estimation in vessels involved in unit operations and chemical processes. This program has been implemented in an operating nuclear fuel processing plant. PREMATH's purpose is to provide steady-state composition estimates for material residing in process vessels until representative samples can be obtained and chemical analyses can be performed. Since these compositions are used for inventory estimation, the results are determined for and cataloged in container-oriented files. The estimated compositions represent material collected in applicable vessels - including consideration for material previously acknowledged in these vessels. The program utilizes process measurements and simple material balance models to estimate material holdups and distribution within unit operations. During simulated run testing, PREMATH-estimated inventories typically produced material balances within 7% of the associated measured material balances for uranium and within 16% of the associated, measured material balances for thorium (a less valuable material than uranium) during steady-state process operation

  11. Implementation and Operational Analysis of an Interactive Intensive Care Unit within a Smart Health Context

    Science.gov (United States)

    Aguirre, Erik

    2018-01-01

    In the context of hospital management and operation, Intensive Care Units (ICU) are one of the most challenging in terms of time responsiveness and criticality, in which adequate resource management and signal processing play a key role in overall system performance. In this work, a context aware Intensive Care Unit is implemented and analyzed to provide scalable signal acquisition capabilities, as well as to provide tracking and access control. Wireless channel analysis is performed by means of hybrid optimized 3D Ray Launching deterministic simulation to assess potential interference impact as well as to provide required coverage/capacity thresholds for employed transceivers. Wireless system operation within the ICU scenario, considering conventional transceiver operation, is feasible in terms of quality of service for the complete scenario. Extensive measurements of overall interference levels have also been carried out, enabling subsequent adequate coverage/capacity estimations, for a set of Zigbee based nodes. Real system operation has been tested, with ad-hoc designed Zigbee wireless motes, employing lightweight communication protocols to minimize energy and bandwidth usage. An ICU information gathering application and software architecture for Visitor Access Control has been implemented, providing monitoring of the Boxes external doors and the identification of visitors via a RFID system. The results enable a solution to provide ICU access control and tracking capabilities previously not exploited, providing a step forward in the implementation of a Smart Health framework. PMID:29382148

  12. Development of a processor embedded timing unit for the synchronized operation in KSTAR

    International Nuclear Information System (INIS)

    Lee, Woongryol; Lee, Taegu; Hong, Jaesic

    2016-01-01

    Highlights: • Timing board for the synchronized tokamak operation. • Processor embedded distributed control system. • Single clock source and multiple trigger signal for the plasma diagnostics. • Delay compensation among the distributed timing boards. - Abstract: The Local Timing Unit (LTU) in KSTAR provides a single clock source and multiple trigger signals with flexible configuration. Over the past seven years, the LTU had a mechanical redesign and several firmware updates for the purpose of provision of a robust operation and precision timing signal. Now we have developed a third version of a local timing unit which has a standalone operation capability. The LTU is built in a cabinet mountable 1U PIZZA box and provides twelve signal output ports, a packet mirroring interface, and an LCD interface panel. The core functions of the LTU are implemented in a Field Programmable Gate Array (FPGA) which has an internal hardcore processor. The internal processor allows the use of Linux Operating System (OS) and the Experimental Physics and Industrial Control System (EPICS). All user level application functions are controllable through the EPICS, however the time critical internal functions are performed by the FPGA logic blocks same as the previous version. The new LTU provides pluggable output module so that we can easily extend the signal output port. The easy installation and effective replacement reduce the efforts of maintenance. This paper describes design, development, and commissioning results of the new KSTAR LTU.

  13. Implementation and Operational Analysis of an Interactive Intensive Care Unit within a Smart Health Context

    Directory of Open Access Journals (Sweden)

    Peio Lopez-Iturri

    2018-01-01

    Full Text Available In the context of hospital management and operation, Intensive Care Units (ICU are one of the most challenging in terms of time responsiveness and criticality, in which adequate resource management and signal processing play a key role in overall system performance. In this work, a context aware Intensive Care Unit is implemented and analyzed to provide scalable signal acquisition capabilities, as well as to provide tracking and access control. Wireless channel analysis is performed by means of hybrid optimized 3D Ray Launching deterministic simulation to assess potential interference impact as well as to provide required coverage/capacity thresholds for employed transceivers. Wireless system operation within the ICU scenario, considering conventional transceiver operation, is feasible in terms of quality of service for the complete scenario. Extensive measurements of overall interference levels have also been carried out, enabling subsequent adequate coverage/capacity estimations, for a set of Zigbee based nodes. Real system operation has been tested, with ad-hoc designed Zigbee wireless motes, employing lightweight communication protocols to minimize energy and bandwidth usage. An ICU information gathering application and software architecture for Visitor Access Control has been implemented, providing monitoring of the Boxes external doors and the identification of visitors via a RFID system. The results enable a solution to provide ICU access control and tracking capabilities previously not exploited, providing a step forward in the implementation of a Smart Health framework.

  14. Implementation and Operational Analysis of an Interactive Intensive Care Unit within a Smart Health Context.

    Science.gov (United States)

    Lopez-Iturri, Peio; Aguirre, Erik; Trigo, Jesús Daniel; Astrain, José Javier; Azpilicueta, Leyre; Serrano, Luis; Villadangos, Jesús; Falcone, Francisco

    2018-01-29

    In the context of hospital management and operation, Intensive Care Units (ICU) are one of the most challenging in terms of time responsiveness and criticality, in which adequate resource management and signal processing play a key role in overall system performance. In this work, a context aware Intensive Care Unit is implemented and analyzed to provide scalable signal acquisition capabilities, as well as to provide tracking and access control. Wireless channel analysis is performed by means of hybrid optimized 3D Ray Launching deterministic simulation to assess potential interference impact as well as to provide required coverage/capacity thresholds for employed transceivers. Wireless system operation within the ICU scenario, considering conventional transceiver operation, is feasible in terms of quality of service for the complete scenario. Extensive measurements of overall interference levels have also been carried out, enabling subsequent adequate coverage/capacity estimations, for a set of Zigbee based nodes. Real system operation has been tested, with ad-hoc designed Zigbee wireless motes, employing lightweight communication protocols to minimize energy and bandwidth usage. An ICU information gathering application and software architecture for Visitor Access Control has been implemented, providing monitoring of the Boxes external doors and the identification of visitors via a RFID system. The results enable a solution to provide ICU access control and tracking capabilities previously not exploited, providing a step forward in the implementation of a Smart Health framework.

  15. RCRA facility investigation/corrective measures study work plan for the 100-HR-3 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under the Hanford Federal Facility Agreement and Consent Order, signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. Also included in the Tri-Party Agreement are 55 Resource Conservation and Recovery Act (RCRA) treatment, storage, or disposal (TSD) facilities that will be closed or permitted to operate in accordance with RCRA regulations, under the authority of Chapter 173-303 Washington Administrative Code (WAC). Some of the TSD facilities are included in the operable units. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the RCRA facility investigation/corrective measures study (RFI/CMS) for the 100-HR-3 operable unit. The 100-HR-3 operable unit underlies the D/DR and H Areas, the 600 Area between them, and the six source operable units these areas contain. The 100-HR-3 operable unit includes all contamination found in the aquifer soils and water within its boundary. Source operable units include facilities and unplanned release sites that are potential sources of contamination. Separate work plans have been initiated for the 100-DR-1 (DOE-RL 1992a) and 100-HR-1 (DOE-RL 1992b) source operable units

  16. On an Integral-Type Operator Acting between Bloch-Type Spaces on the Unit Ball

    Directory of Open Access Journals (Sweden)

    Stevo Stević

    2010-01-01

    Full Text Available Let 𝔹 denote the open unit ball of ℂn. For a holomorphic self-map φ of 𝔹 and a holomorphic function g in 𝔹 with g(0=0, we define the following integral-type operator: Iφgf(z=∫01ℜf(φ(tzg(tz(dt/t, z∈𝔹. Here ℜf denotes the radial derivative of a holomorphic function f in 𝔹. We study the boundedness and compactness of the operator between Bloch-type spaces ℬω and ℬμ, where ω is a normal weight function and μ is a weight function. Also we consider the operator between the little Bloch-type spaces ℬω,0 and ℬμ,0.

  17. Operation of Beaver Valley Power Station, Unit 2, Docket No. 50-412, Beaver County, Pennsylvania

    International Nuclear Information System (INIS)

    1985-09-01

    The final environmental impact statement (EPA No. 850438F) assesses the effects of operating a pressurized water reactor in Pennsylvania on the south bank of the Ohio River, which would serve as the final heat sink for the cooling system. Operation of Unit 2 would add 836 MW of capacity and increase system reliability. The plant would employ 465 at an $18 million payroll. Facilities for the plant would take up 56 acres of agricultural land. The operation result in both water and noise pollution. There is only a small probability of impacts due to potential radiation exposure. The Federal Water Pollution Control Act of 1972 and Nuclear Regulatory Commission Regulations require the impact statement

  18. NRC plan for cleanup operations at Three Mile Island Unit 2

    International Nuclear Information System (INIS)

    Lo, R.; Snyder, B.

    1982-02-01

    This NRC Plan, which defines NRC's functional role in cleanup operations at Three Mile Island Unit 2 and outlines NRC's regulatory responsibilities in fulfilling this role, is the first revision to the initial plan issued in July 1980 (NUREG-0698). Since 1980, a number of policy developments have occurred which will have an impact on the course of cleanup operations. This revision reflects these developments in the area of NRC's review and approval process with regard to cleanup operations as well as NRC's interface with the Department of Energy's involvement in the cleanup and waste disposal. This revision is also intended to update the cleanup schedule by presenting the cleanup progress that has taken place and NRC's role in ongoing and future cleanup activities

  19. Regulating manure application discharges from concentrated animal feeding operations in the United States

    International Nuclear Information System (INIS)

    Centner, Terence J.; Feitshans, Theodore A.

    2006-01-01

    In the United States, reducing pollution from agriculture has received attention due to data suggesting that this is the leading source of impairment of many waterbodies. The federal government revised its regulations governing concentrated animal feeding operations (CAFOs) to enhance governmental oversight over sources of pollution. For the application of manure resulting in pollutant discharges, CAFOs need to implement nutrient management plans. A federal court affirmed the ability of the US federal government to oversee the application of manure from CAFOs that have discharges. Simultaneously, owners and operators of CAFOs who have implemented an appropriate nutrient management plan may forgo securing a permit if their discharges qualify under the agricultural stormwater discharge exemption. - New rules applying to the application of manure by large concentrated animal feeding operations should reduce water contamination

  20. Survey of fish impingement at power plants in the United States. Volume III. Estuaries and coastal waters

    International Nuclear Information System (INIS)

    Stupka, R.C.; Sharma, R.K.

    1977-03-01

    Impingement of fish at cooling-water intakes of 32 power plants, located on estuaries and coastal waters has been surveyed and data are presented. Descriptions of site, plant, and intake design and operation are provided. Reports in this volume summarize impingement data for individual plants in tabular and histogram formats. Information was available from differing sources such as the utilities themselves, public documents, regulatory agencies, and others. Thus, the extent of detail in the reports varies greatly from plant to plant. Histogram preparation involved an extrapolation procedure that has inadequacies. The reader is cautioned in the use of information presented in this volume to determine intake-design acceptability or intensity of impacts on ecosystems. No conclusions are presented herein; data comparisons are made in Volume IV