  1. Primary heat transport pump mechanical seal replacement strategy for Pickering B

    International Nuclear Information System (INIS)

    Chacinsi, V.

    1995-01-01

    Pickering Nuclear Generating Station is a CANDU PHWR eight unit station located on Lake Ontario. The station is divided into Pickering A (Units 1 to 4) and Pickering B (Units 5 to 8). Pickering B is the focus of this paper. Each unit is rated at 540 MWe. The Primary Heat Transport (PHT) system, which is used to cool the fuel, is divided into four quadrants. Each quadrant has four vertical Byron Jackson PHT main circulation pumps. Three pumps in each quadrant are required for normal operation, leaving one pump in each quadrant as a spare. Each Pickering PHT pump has a Byron Jackson Type SU two stage mechanical seal. The typical pressure breakdown across the seal is 8.7-4.5-1.0 MPa. Certain features of seal operation and the PHT system which influence seal replacement are discussed below. (author)

  2. Aspects regarding the fuel management for PHWR nuclear reactors

    International Nuclear Information System (INIS)

    Dragusin, O.; Bobolea, A.; Voicu, A.

    2001-01-01

    Fuel management for PHWR nuclear reactors is completely different from the PWR reactors fuel management. PHWR reactor fuel loading procedures are repeated after an interval of time, as defined and specified in the project documentation, using a fuel machine that can be attached to the terminal fittings of horizontal pressure tubes while the reactor is a full power. Another aspect of fuel management policy is related to the possibility of bi-directional loading of the reactor, with the primary advantage of uniform and symmetrical characteristics. (authors)

  3. Large scale replacement of fuel channels in the Pickering CANDU reactor using a man-in-the-loop remote control system

    International Nuclear Information System (INIS)

    Stratton, D.

    1991-01-01

    Spar Aerospace Limited of Toronto is presently under contract to Ontario Hydro to design a Remote Manipulation and Control System (RMCS) to be used during the large scale replacement of the fuel channels in the Pickering A Nuclear Generating Station. The system is designed to support the replacement of all 390 fuel channels in each of the four reactors at the Pickering A station in a safe manner that minimizes worker radiation exposure and unit outage time

  4. Pressure tube replacement in Pickering NGS A units 1 and 2

    International Nuclear Information System (INIS)

    Irvine, H.S.; Bennett, E.J.; Talbot, K.H.

    1986-10-01

    Being able to technically and economically replace the most radioactive components (excluding the nuclear fuel) in operating reactors will help to ensure the ongoing acceptance of nuclear power as a viable energy source for the future. Ontario Hydro is well along the path to meeting the above objective for its CANDU-PHW reactors. Following the failure of a Zircaloy-II pressure tube in unit 2 of Pickering NGS A in August, 1983, Ontario Hydro has embarked on a program to replace all Zircaloy-II pressure tubes in units 1 and 2 at Pickering. This program integrates the in-house research, design, construction, and operating skills of a large utility (Ontario Hydro) with the skills of a national nuclear organization (Atomic Energy of Canada Limited) and the private engineering sector of the Canadian nuclear industry. The paper describes the background to the pressure tube failure in Pickering unit 2 and to the efforts incurred in understanding the failure mechanism and how similar failures are not expected for the zirconium-niobium pressure tube material used in all other large CANDU-PHW units after units 1 and 2 of Pickering NGS A. The tooling developed for the pressure tube replacement program is described as well as the organization to undertake the program in an operating nuclear station. The retubing of units 1 and 2 at Pickering NGS A is nearing a successful completion and shows the benefits of being able to integrate the various skills required for this success. Pressure tube replacement in a CANDU-PHW reactor is equivalent to replacement of the reactor vessel in a LWR. The fact that this replacement can be done economically and with acceptable radiation dose to workers augurs well for the continued viability of the use of nuclear energy for the benefit of mankind. (author)

  5. Estimating cancer risk in relation to tritium exposure from routine operation of a nuclear-generating station in Pickering, Ontario.

    Science.gov (United States)

    Wanigaratne, S; Holowaty, E; Jiang, H; Norwood, T A; Pietrusiak, M A; Brown, P

    2013-09-01

    Evidence suggests that current levels of tritium emissions from CANDU reactors in Canada are not related to adverse health effects. However, these studies lack tritium-specific dose data and have small numbers of cases. The purpose of our study was to determine whether tritium emitted from a nuclear-generating station during routine operation is associated with risk of cancer in Pickering, Ontario. A retrospective cohort was formed through linkage of Pickering and north Oshawa residents (1985) to incident cancer cases (1985-2005). We examined all sites combined, leukemia, lung, thyroid and childhood cancers (6-19 years) for males and females as well as female breast cancer. Tritium estimates were based on an atmospheric dispersion model, incorporating characteristics of annual tritium emissions and meteorology. Tritium concentration estimates were assigned to each cohort member based on exact location of residence. Person-years analysis was used to determine whether observed cancer cases were higher than expected. Cox proportional hazards regression was used to determine whether tritium was associated with radiation-sensitive cancers in Pickering. Person-years analysis showed female childhood cancer cases to be significantly higher than expected (standardized incidence ratio [SIR] = 1.99, 95% confidence interval [CI]: 1.08-3.38). The issue of multiple comparisons is the most likely explanation for this finding. Cox models revealed that female lung cancer was significantly higher in Pickering versus north Oshawa (HR = 2.34, 95% CI: 1.23-4.46) and that tritium was not associated with increased risk. The improved methodology used in this study adds to our understanding of cancer risks associated with low-dose tritium exposure. Tritium estimates were not associated with increased risk of radiationsensitive cancers in Pickering.

  6. Comparison of Pickering NGS performance with world power reactors, 1977

    International Nuclear Information System (INIS)

    Buhay, S.

    Pickering NGS performance is compared, in highly graphic form, with the perfomance of other nuclear power plants around the world. The four Pickering reactors score in the top six, rated by gross capacity factor. Major system suppliers for world power reactors above 500 MW are cataloged. (E.C.B.)

  7. Ontario Hydro Pickering Generating Station fuel handling system performance

    International Nuclear Information System (INIS)

    Underhill, H.J.

    1986-01-01

    The report briefly describes the Pickering Nuclear Generating Station (PNGS) on-power fuel handling system and refuelling cycle. Lifetime performance parameters of the fuelling system are presented, including station incapability charged to the fuel handling system, cost of operating and maintenance, dose expenditure, events causing system unavailability, maintenance and refuelling strategy. It is concluded that the 'CANDU' on-power fuelling system, by consistently contributing less than 1% to the PNGS incapability, has been credited with a 6 to 20% increase in reactor capacity factor, compared to off-power fuelling schemes. (author)

  8. The status of improved pressurized heavy water reactor development - A new option for PHWR -

    International Nuclear Information System (INIS)

    Park, Tae Keun; Yeo, Ji Won

    1996-03-01

    Currently, the 900 MWe class Improved Pressurized Heavy Water Reactor (PHWR), which is a type of CANDU reactor based on the systems and components of operating CANDU plants, is under development. The improved PHWR has a 480 fuel channel calandria, uses 37 element natural uranium fuel bundles and has a single unit containment. Adaptation of a steel-lined containment structure and improved containment isolation systems permit a reduced exclusion area boundary (EAB) compared to the existing larger capacity CANDU reactors (Darlington, Bruce B). The improved PHWR buildings are arranged to achieve minimum spacing between reactor units. Plant safety and economy are increased through various design changes based on the operating experience of existing CANDU plants. 4 refs. (Author)

  9. Application of Shuttle Remote Manipulator System technology to the replacement of fuel channels in the Pickering CANDU reactor

    International Nuclear Information System (INIS)

    Stratton, D.; Butt, C.

    1982-04-01

    Spar Aerospace Limited of Toronto was the prime contractor to the National Research Council of Canada for the design and development of the Shuttle Remote Manipulator (SRMS). Spar is presently under contract to Ontario Hydro to design and build a Remote Manipulation Control System to replace the fuel channels in the Pickering A Nuclear Generating Station. The equipment may be used to replace the fuel channels in six other early generation CANDU reactors

  10. Some engineering aspects of the investigation into the cracking of pressure tubes in the Pickering reactors

    International Nuclear Information System (INIS)

    Ross-Ross, P.A.; Towgood, G.R.; Hunter, T.A.

    1976-01-01

    In August 1974, Pickering Unit 3 (514 MWe) was shutdown for a period of 8 months because of cracks in 17 of the 390 pressure tubes. The cracks were a result of incorrect installation procedures during construction. Improper positioning of the rolling tool used to join the Zr-2.5 wt% Nb pressure tube to the end fitting produced very high residual tensile stresses. High stresses in combination with periods with the tubes cold caused the cracking. Crack propagation was by fracture of hydrides which are brittle when cold. Subsequent investigation confirmed that properly rolled joints are not susceptible to such cracking. The resources of Canadian industry, Ontario Hydro and Atomic Energy of Canada were coordinated to find engineering solutions to the crack program. The defective tubes were removed from reactor, thoroughly examined to identify the cause of the cracks, and thoroughly tested to prove safety. Non-destructive techniques were quickly adopted for inspection of tubes in Pickering. Tools and procedures for retubing the 17 channels were prepared and Pickering Unit 3 was returned to service at the end of March 1975. (author)

  11. Development and applications of reactor noise analysis at Ontario Hydro's CANDU reactors

    International Nuclear Information System (INIS)

    Gloeckler, O.; Tulett, M.V.

    1995-01-01

    In 1992 a program was initiated to establish reactor noise analysis as a practical tool for plant performance monitoring and system diagnostics in Ontario Hydro's CANDU reactors. Since then, various CANDU-specific noise analysis applications have been developed and validated. The noise-based statistical techniques are being successfully applied as powerful troubleshooting and diagnostic tools to a wide variety of actual operational I and C problems. The dynamic characteristics of critical plant components, instrumentation and processes are monitored on a regular basis. Recent applications of noise analysis include (1) validating the dynamics of in-core flux detectors (ICFDS) and ion chambers, (2) estimating the prompt fraction ICFDs in noise measurements at full power and in power rundown tests, (3) identifying the cause of excessive signal fluctuations in certain flux detectors, (4) validating the dynamic coupling between liquid zone control signals, (5) detecting and monitoring mechanical vibrations of detector tubes induced by moderator flow, (6) estimating the dynamics and response time of RTD (Resistance Temperature Detector) temperature signals, (7) isolating the cause of RTD signal anomalies, (8) investigating the source of abnormal flow signal behaviour, (9) estimating the overall response time of flow and pressure signals, (10) detecting coolant boiling in fully instrumented fuel channels, (11) monitoring moderator circulation via temperature noise, and (12) predicting the performance of shut-off rods. Some of these applications are performed on an as-needed basis. The noise analysis program, in the Pickering-B station alone, has saved Ontario Hydro millions of dollars during its first three years. The results of the noise analysis program have been also reviewed by the regulator (Atomic Energy Control Board of Canada) with favorable results. The AECB have expressed interest in Ontario Hydro further exploiting the use of noise analysis technology. (author

  12. Mathematical modeling of CANDU-PHWR

    Energy Technology Data Exchange (ETDEWEB)

    Gaber, F.A.; Aly, R.A.; El-Shal, A.O. [Atomic Energy Authority, Cairo (Egypt)

    2003-07-01

    The paper deals with the transient studies of CANDU 600 pressurized Heavy Water Reactor (PHWR). This study involved mathematical modeling of CANDU-PHWR to study its thermodynamic performances. Modeling of CANDU-PHWR was based on lumped parameter technique. The reactor model includes the neutronic, reactivity, and fuel channel heat transfer. The nuclear reactor power was modelled using the point kinetics equations with six groups of delayed neutrons and the reactivity feed back due to the changes in the fuel temperature and coolant temperature. The CANDU-PHWR model was coded in FORTRAN language and solved by using a standard numerical technique. The adequacy of the model was tested by assessing the physical plausibility of the obtained results. (author)

  13. Development and applications of reactor noise analysis at Ontario Hydro`s CANDU reactors

    Energy Technology Data Exchange (ETDEWEB)

    Gloeckler, O [Ontario Hydro, Toronto, ON (Canada); Tulett, M V [Ontario Hydro, Pickering, ON (Canada). Pickering Generating Station

    1996-12-31

    In 1992 a program was initiated to establish reactor noise analysis as a practical tool for plant performance monitoring and system diagnostics in Ontario Hydro`s CANDU reactors. Since then, various CANDU-specific noise analysis applications have been developed and validated. The noise-based statistical techniques are being successfully applied as powerful troubleshooting and diagnostic tools to a wide variety of actual operational I and C problems. The dynamic characteristics of critical plant components, instrumentation and processes are monitored on a regular basis. Recent applications of noise analysis include (1) validating the dynamics of in-core flux detectors (ICFDS) and ion chambers, (2) estimating the prompt fraction ICFDs in noise measurements at full power and in power rundown tests, (3) identifying the cause of excessive signal fluctuations in certain flux detectors, (4) validating the dynamic coupling between liquid zone control signals, (5) detecting and monitoring mechanical vibrations of detector tubes induced by moderator flow, (6) estimating the dynamics and response time of RTD (Resistance Temperature Detector) temperature signals, (7) isolating the cause of RTD signal anomalies, (8) investigating the source of abnormal flow signal behaviour, (9) estimating the overall response time of flow and pressure signals, (10) detecting coolant boiling in fully instrumented fuel channels, (11) monitoring moderator circulation via temperature noise, and (12) predicting the performance of shut-off rods. Some of these applications are performed on an as-needed basis. The noise analysis program, in the Pickering-B station alone, has saved Ontario Hydro millions of dollars during its first three years. The results of the noise analysis program have been also reviewed by the regulator (Atomic Energy Control Board of Canada) with favorable results. The AECB have expressed interest in Ontario Hydro further exploiting the use of noise analysis technology. (author

  14. Newly discovered geological features and their potential impact on Darlington and Pickering

    International Nuclear Information System (INIS)

    Wallach, J.L.

    1990-01-01

    Newly available information reveals the presence of a prominent north-northeast oriented aeromagnetic lineament and east-northeast trending, linear patterns in young sediments on the bottom of Lake Ontario. The magnetic lineament, named the Niagara-Pickering Magnetic Lineament, passes practically beneath the Pickering Nuclear Generating Station (8x1600 MW reactors), and about 30 km west of the Darlington Nuclear Generating Station (4x2800 MW reactors). Magnetic data suggest that the Niagara-Pickering Magnetic Lineament may be the signature of a fault and may connect with the Akron Magnetic Boundary in Ohio, with which several earthquakes appear to be associated. Geological data lend support to the fault hypothesis. A north-northwest trending belt of earthquake epicenters, which includes the Lockport, NY earthquake (est M=5.0) and the Attica, NY earthquake (M=5.8), lies just east of, and parallels, the entire length of Georgian Bay en route to Attica, New York. The proximity and parallelism of the Georgian Bay Linear Zone to this belt of earthquake epicenters implies that the Georgian Bay Linear Zone may be tectonically active. The Georgian Bay Linear Zone and the Niagara-Pickering Magnetic Lineament appear to intersect very near Pickering and within about 30 km from Darlington. This, combined with evidence of high horizontal stresses in the area and the implication that both lineaments may be seismically active, suggests that many of the ingredients necessary for an earthquake of at least M=5.0 to M=6.25 exist near both Darlington and Pickering. Therefore, it is necessary that the Niagara-Pickering Magnetic Lineament, the Georgian Bay Linear Zone and the other newly discovered structural features be properly evaluated in order to determine whether or not the current Design Basis Seismic Ground Motions for Darlington and Pickering are adequate

  15. AECB staff annual assessment of the Pickering A and B Nuclear Generating Stations for the year 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    The Pickering Nuclear Generating Station (PNGS) is located on the north shore of Lake Ontario, about 32 km east of downtown Toronto. It consists of two stations, PNGS-A and PNGS-B. Each station contains four reactor units. PNGS-A consists of Units 1 to 4, while PNGS-B consists of Units 5 to 8. Each unit can generate about 540 megawatts of electricity. All eight units are located within a single enclosure. Ontario Hydro`s Pickering Nuclear Division has assigned one Station Director with authority over both stations, but each station has its own organization. AECB issue a separate operating licence for each station. This report presents the Atomic Energy Control Board staff assessment of the Pickering stations` safety performance in 1994 and other aspects that they consider to have significant impact on nuclear safety. AECB based their conclusions on their observations, audits, inspections and review of information that Ontario Hydro submits to them as required by the station Operating Licences. 11 tabs., 8 figs.

  16. AECB staff annual assessment of the Pickering A and B Nuclear Generating Stations for the year 1994

    International Nuclear Information System (INIS)

    1995-06-01

    The Pickering Nuclear Generating Station (PNGS) is located on the north shore of Lake Ontario, about 32 km east of downtown Toronto. It consists of two stations, PNGS-A and PNGS-B. Each station contains four reactor units. PNGS-A consists of Units 1 to 4, while PNGS-B consists of Units 5 to 8. Each unit can generate about 540 megawatts of electricity. All eight units are located within a single enclosure. Ontario Hydro's Pickering Nuclear Division has assigned one Station Director with authority over both stations, but each station has its own organization. AECB issue a separate operating licence for each station. This report presents the Atomic Energy Control Board staff assessment of the Pickering stations' safety performance in 1994 and other aspects that they consider to have significant impact on nuclear safety. AECB based their conclusions on their observations, audits, inspections and review of information that Ontario Hydro submits to them as required by the station Operating Licences. 11 tabs., 8 figs

  17. Recent experience related to neutronic transients in Ontario Hydro CANDU nuclear generating stations

    International Nuclear Information System (INIS)

    Frescura, G.M.; Smith, A.J.; Lau, J.H.

    1991-01-01

    Ontario Hydro presently operates 18 CANDU reactors in the province of Ontario, Canada. All of these reactors are of the CANDU Pressurized Heavy Water design, although their design features differ somewhat reflecting the evolution that has taken place from 1971 when the first Pickering unit started operation to the present as the Darlington units are being placed in service. Over the last three years, two significant neutronic transients took place at the Pickering Nuclear Generating Station 'A' (NGS A) one of which resulted in a number of fuel failures. Both events provided valuable lessons in the areas of operational safety, fuel performance And accident analysis. The events and the lessons learned are discussed in this paper

  18. Pickering Unit 1 chemical cleaning

    International Nuclear Information System (INIS)

    Smee, J.L.; Fiola, R.J.; Brennenstuhl, K.R.; Zerkee, D.D.; Daniel, C.M.

    1995-01-01

    The secondary sides of all 12 boilers at Pickering Unit 1 were chemically cleaned in 1994 by the team of Ontario Hydro, B and W International (Cambridge, Ontario) and B and W Nuclear Technologies (Lynchburg, Virginia). A multi-step EPRI/SGOG process was employed in a similar manner to previous clearings at Units 5 and 6 in 1992 and 1993, respectively. A major innovation with the Unit 1 cleaning was the incorporation of a crevice cleaning step, the first time this had been done on Ontario Hydro plants. In addition, six boilers were cleaned in parallel compared to three at a time in previous Pickering cleanings. This significantly reduced cleaning time. A total of 6,770 kg of sludge was removed through direct chemical dissolution. It consisted of 66% iron/nickel oxides and 28% copper metal. A total of 1,600,000 L (420,000 US gallons) of liquid waste was produced. It was processed through the spent solvent treatment facility located at the Bruce Nuclear Power Development site. Visual inspection performed after the cleaning indicated that the crevices between the boiler tubes and the tube support structure were completely clear of deposit and the general condition of the tubing and lattice bars appeared to be in 'as new' condition. (author)

  19. Experience with valves for PHWR reactors

    International Nuclear Information System (INIS)

    Narayan, K.; Mhetre, S.G.

    1977-01-01

    Material specifications and inspection and testing requirements of the valves meant for use in nuclear reactors are mentioned. In the heavy water systems (both primary and moderator) of a PHWR type reactor, the valves used are gate valves, globe valves, diaphragm valves, butterfly valves, check valves and relief valves. Their locations and functions they perform in the Rajasthan Atomic Power Station Unit-1 are described. Experience with them is given. The major problems encountered with them have been : (1) leakage from the stem seals and body bonnet joint, (2) leakage due to failure of diaphragm and/or washout of the packing and (3) malfunctioning. Measures taken to solve these are discussed. Finally a mention has been made of improved versions of valves, namely, metal diaphragm valve and inverted relief valve. (M.G.B.)

  20. Development of advanced CANDU PHWR -Development of the advanced CANDU technology-

    International Nuclear Information System (INIS)

    Seok, Ho Cheon; Na, Yeong Hwan; Seok, Soo Dong; Lee, Bo Uk; Kwak, Ho Sang; Kim, Bong Ki; Kim, Seok Nam; Min, Byeong Joo; Park, Jong Ryunl; Shin, Jeong Cheol; Lee, Kyeong Ho; Lee, Dae Hee; Lee, Deuk Soo; Lee, Yeong Uk; Lee, Jeong Yang; Jwon, Jong Seon; Jwon, Chang Joon; Ji, Yong Kwan; Han, Ki Nam; Kim, Kang Soo; Kim, Dae Jin; Kim, Seon Cheol; Kim, Seong Hak; Kim, Yeon Seung; Kim, Yun Jae; Kim, Jeong Kyu; Kim, Jeong Taek; Kim, Hang Bae; Na, Bok Kyun; Namgung, In; Moon, Ki Hwan; Park, Keun Ok; Shon, Ki Chang; Song, In Ho; Shin, Ji Tae; Yeo, Ji Won; Oh, In Seok; Jang, Ik Ho; Jeong, Dae Won; Jeong, Yong Hwan; Ha, Jae Hong; Ha, Jeong Koo; Hong, Hyeong Pyo; Hwang, Jeong Ki

    1994-07-01

    The target of this project is to assess the feasibility of improving PHWR and to establish the parameter of the improved concept and requirements for developing it. To set up the requirements for the Improved Pressurized Heavy Water Reactor: (1) Design requirements of PHWR main systems and Safety Design Regulatory Requirements for Safety Related System i.e. Reactor Shutdown System, Emergency Core Cooling System and Containment System were prepared. (2) Licensing Basis Documents were summarized and Safety Analysis Regulatory. Requirements were reviewed and analyzed. To estimate the feasibility of improving PHWR and to establish the main parameters of the concept of new PHWR in future: (1) technical level/developing trend of PHWR in Korea through Wolsong 2, 3 and 4 design experience and Technical Transfer Program was investigated to analyze the state of basic technology and PHWR improvement potential. (2) CANDU 6 design improvement tendency, CANDU 3 design concept and CANDU 9 development state in other country was analyzed. (3) design improvement items to apply to the reactors after Wolsong 2, 3 and 4 were selected and Plant Design Requirements and Conceptual Design Description were prepared and the viability of improved HWR was estimated by analyzing economics, performance and safety. (4) PHWR technology improving research and development plan was established and international joint study initiated for main design improvement items

  1. NERON-Computing system for PHWR reactor cells and heterogeneous parameter calculations

    International Nuclear Information System (INIS)

    Cristian, I.; Cirstoiu, B.; Slavnicu, S.D.

    1976-04-01

    A system of codes for PHWR type reactors is presented. The system includes the cell code NERO and a code PARETE for monopolar and dipolar heterogeneous calculations. A general theory of dipolar flux is necessary for a more accurate evaluation of void coefficient and diffusion moderator coefficient is given. The determination of monopolar and dipolar heterogeneous parameters is very useful for heterogeneous methods developped especially for HWR reactors during the last years. (author)

  2. Commissioning quality assurance at Pickering NGS

    International Nuclear Information System (INIS)

    Wieckowski, J.T.

    1983-05-01

    Ontario Hydro decided in 1978 to implement a formal quality assurance program applicable to commissioning and operation of nuclear generating stations. Pickering NGS is the first station to have the commissioning quality assurance (CQA) program applied to it. This paper outlines the scope, implementation, and evaluation of the CQA program as applied to Pickering Unit 5

  3. AECB staff review of Pickering NGS operations for the year 1988

    International Nuclear Information System (INIS)

    1989-05-01

    The operation of Pickering NGS-A Units 1-4 and Pickering NGS-B Units 5-8 are monitored to ensure compliance with licensing requirements by the AECB Pickering project office staff. This report presents AECB staff's review of major licensing issues and of the operational performance of Pickering NGS during 1988. The report is limited to those aspects that AECB staff considers to have particular safety significance. More detailed information on routine performance is contained in Ontario Hydro's 1988 Quarterly Technical Reports for Pickering NGS-A and Pickering NGS-B

  4. Mathematical modeling of CANDU-PHWR

    Energy Technology Data Exchange (ETDEWEB)

    Gaber, F.A.; Aly, R.A.; El-Shal, A.O. [Atomic Energy Authority, Cairo (Egypt)

    2001-07-01

    The paper deals with the transient studies of CANDU 600 pressurized Heavy Water Reactor (PHWR) system. This study involved mathematical modeling of CANDU PHWR major system components and the developments of software to study the thermodynamic performances. Modeling of CANDU-PHWR was based on lumped parameter technique.The integrated CANDU-PHWR model includes the neutronic, reactivity, fuel channel heat transfer, piping and the preheater type U-tube steam generator (PUTSG). The nuclear reactor power was modelled using the point kinetics equations with six groups of delayed neutrons and reactivity feed back due to the changes in fuel temperature and coolant temperature. The complex operation of the preheater type U-tube steam generator (PUTSG) is represented by a non-linear dynamic model using a state variable, moving boundary and lumped parameter techniques. The secondary side of the PUTSG model has six separate lumps including a preheater region, a lower boiling section, a mixing region, a riser, a chimmeny section, and a down-corner. The tube side of PUTSG has three main thermal zones. The PUTSG model is based on conservation of mass, energy and momentum relation-ships. The CANDU-PHWR integrated model are coded in FORTRAN language and solved by using a standard numerical technique. The adequacy of the model was tested by assessing the physical plausibility of the obtained results. (author)

  5. The safety of Ontario's nuclear reactors

    International Nuclear Information System (INIS)

    1980-06-01

    A Select Committee of the Legislature of Ontario was established to examine the affairs of Ontario Hydro, the provincial electrical utility. Extensive public hearings were held on several topics including the safety of nuclear power reactors operating in Ontario. The Committee found that these reactors are acceptably safe. Many of the 24 recommendations in this report deal with the licensing process and public access to information. (O.T.)

  6. Design, construction and operation of Ontario Hydro's CANDU plants

    International Nuclear Information System (INIS)

    Campbell, P.G.

    1981-06-01

    Ontario Hydro has been producing electricity commercially from nuclear power since 1968, using CANDU reactors which have proved enormously successful. The 206-MW Douglas Point station, nearly 10 times larger than the first Canadian power reactor, NPD-2, resulted from a cooperative effort between Atomic Energy of Canada Ltd., the provincial government of Ontario, and Ontario Hydro. This approach led to a basic working relationship between the parties, with Ontario Hydro acting as project manager and builder, and AECL acting as consultant with respect to the nuclear components. Before Douglas Point was fully commissioned Ontario Hydro was ready to commit itself to more nuclear stations, and work was started on the four-unit Pickering nuclear generating station. Multi-unit stations were adopted to achieve economies of scale, and the concept has been retained for all subsequent nuclear power plants constructed in the province. The organization of Ontario Hydro's project management, construction, and operation of nuclear generating stations is described. Performance of the existing stations and cost of the power they produce have been entirely acceptable

  7. Pickering tool management system

    International Nuclear Information System (INIS)

    Wong, E.H.; Green, A.H.

    1997-01-01

    Tools were being deployed in the station with no process in effect to ensure that they are maintained in good repair so as to effectively support the performance of Maintenance activities. Today's legal requirements require that all employers have a process in place to ensure that tools are maintained in a safe condition. This is specified in the Ontario Health and Safety Act. The Pickering Tool Management System has been chosen as the process at Pickering N.D to manage tools. Tools are identified by number etching and bar codes. The system is a Windows application installed on several file servers

  8. Irradiation tests on PHWR type fuel elements in TRIGA research reactor of INR Pitesti

    Energy Technology Data Exchange (ETDEWEB)

    Horhoianu, Grigore [Institute for Nuclear Research, Pitesti (Romania). Nuclear Fuel Engineering Lab.; Sorescu, Ion [Institute for Nuclear Research, Pitesti (Romania). TRIGA Reactor Loop Facility; Parvan, Marcel [Institute for Nuclear Research, Pitesti (Romania). Hot Cells Lab.

    2012-12-15

    Nine PHWR type fuel elements with reduced length were irradiated in loop A of the TRIGA Research Reactor of INR Pitesti. The primary objective of the test was to determine the performance of nuclear fuel fabricated at INR Pitesti at high linear powers in pressurized water conditions. Six fuel elements were irradiated with a ramp power history, achieving a maximum power of 45 kW/m during pre-ramp and of 64 kW/m in the ramp. The maximum discharge burnup was of 216 MWh/kgU. Another three fuel elements with reduced length were irradiated with declining power history. At the beginning of irradiation the fuel elements achieved a maximum linear power of 66 kW/m. The maximum fuel power was about 1.3 times the maximum expected in PHWR. The maximum discharge burnup was 205 MWh/kgU. The elements were destructively examined in the hot cells of INR Pitesti. Temperature-sensitive parameters such as UO{sub 2} grain growth, fission-gas release and sheath deformations were examined. The tests proved the feasibility of irradiating PHWR type fuel elements at linear powers up to 66 kW/m under pressurized water conditions and demonstrated the possibility of more flexible operation of this fuel in power reactors. This paper presents the results of the investigation. (orig.)

  9. The safety of Ontario's nuclear power reactors. A scientific and technical review. Ontario Hydro Submission to the Ontario Nuclear Safety Review

    International Nuclear Information System (INIS)

    1987-01-01

    Ontario Hydro is responsible for the safety of its nuclear stations: safety analysis, design and construction, training of operators, operating practices, and maintenance procedures. The utility must demonstrate to the regulatory body and the public that it is capable of operating nuclear stations safely. the dedicated attention of management and workers alike has been given to the achievement of an excellent safety record. Safety begins with well understood corporate goals, objectives and policies, and the clear assignment of responsibilities to well-trained, competent people who have the relevant experience and the right information and equipment. A prime cause of both the Chernobyl and the Three Mile Island accidents was a breakdown in operational procedures and human factors. On the contrary, the pressure tube failure at Pickering unit 2 in 1983 was understood almost immediately by the operators, who took the correct steps to shut down the reactor. This success is related to well-designed control room information systems and good understanding of fundamentals by the operators. Increasingly, in the design of nuclear plant control and instrumentation systems and in training in Ontario Hydro, the well-being, capabilities and limitations of humans are being taken into account. This report describes the series of barriers between the radioactive material in the fuel and the series of barriers between the radioactive material in the fuel and the environment, and the stringent quality control and technical measures taken to make the likelihood of malfunctions very small. Defence in depth protection for the public is a feature of all Ontario Hydro nuclear stations. As safety-related systems are updated in new stations, improvements are in some cases being backfitted to older stations

  10. Pickering education centre aids nuclear acceptance

    International Nuclear Information System (INIS)

    Anon.

    1979-01-01

    Activities at the new education centre at Pickering are described. The opening of the Nuclear Communications Centre, in 1978, resulting from a search for an effective means of maintaining public acceptance of Ontario Hydro's extensive nuclear power programme. Activities include participation in the interactive computer games, guided tours of educational exhibits including a model of Pickering A generating station, and displays depicting the Candu fuel cycle, outdoor exhibits of renewable energy sources, and tours of the plant. Outside activities include lectures to schools and citizen, business, or professional groups. (U.K.)

  11. A study of wet deposition of atmospheric tritium releases at the Ontario Power Generation, Pickering Nuclear Generating Station

    International Nuclear Information System (INIS)

    Crooks, G.; DeWilde, J.; Yu, L.

    2001-01-01

    The Ontario Power Generation,Pickering Nuclear Generating Station (PNGS) has been investigating deposition of atmospheric releases of tritium on their site. This study has included numerical dispersion modelling studies conducted over the past three years, as well as an ongoing field monitoring study. The following paper will present results of the field monitoring study and make comparisons to the numerical modelling. The results of this study could be of potential use to nuclear stations in quantifying tritium deposition in near field regions where building wake effects dominate pollutant dispersion

  12. PHWR Fuel - an integrated approach in Indian context

    International Nuclear Information System (INIS)

    Jayaraj, R.N.

    2008-01-01

    The nuclear power programme in India is based on a three-stage approach in which the Pressurized Heavy Water Reactors (PHWR) forms the backbone of the first stage. Over the years, apart from gaining expertise in design, construction and operation of PHWRs, innovative fuel designs and manufacturing technologies have also been evolved. Presently, thirteen PHWR 220 units and two PHWR 540 units are in operation. Three more PHWR 220 units are in the advanced stage of construction. In addition, the PHWR power generation programme envisages construction of eight more PHWR 700 units. Nuclear Fuel Complex (NFC) at Hyderabad, established in early 70s, is the only manufacturer of fuel and reactor core structurals for all the PHWRs in India. Since inception, the thrust has been on indigenous development of technology in the areas of production processes, equipment manufacture and quality assurance programmes. Commensurate with the PHWR programme, NFC has expanded its production capacities and has fabricated more than 380,000 fuel bundles since inception. Towards optimization of uranium resources and implementation of 'closed fuel cycle' concept, large quantities of reprocessed uranium fuel bundles have been manufactured and introduced in the initial cores of PHWRs. In recent times, NFC introduced several modifications in the production processes like vapour ammonia precipitation for UO 2 powder production, advanced resistance welding controls and improved versions of welding machines, which all have facilitated in improving the quality and productivity of the fuel. Superior quality control systems like spectrophotometric determination of SSA of UO 2 powders, machine vision systems for pellet inspection, thermography for evaluating weld integrity, etc. has channelised NDT techniques into fuel production lines. The paper summarizes various improvements carried out in the design and manufacture of PHWR fuel. New concepts evolved in high burn-up fuels and development of state

  13. Retrofit of AECL CAN6 seals into the Pickering shutdown cooling pumps

    International Nuclear Information System (INIS)

    Rhodes, D.; Metcalfe, R.; Brown, G.

    1997-01-01

    The existing mechanical seals in the shutdown cooling (SDC) pumps at the eight-unit Pickering Nuclear Generating Station have caused as least seven forced outages in the last fifteen years. The SDC pumps were originally intended to run only during shutdowns, mostly at low pressure, except for short periods during routine testing of SDC isolation valves while the plant is operating at full pressure to verify that the emergency core injection system is available. Unfortunately, in practice, some SDC pumps must be run much more frequently than this to prevent overheating or freezing of components in the system while the plant is at power. This more severe service has decreased seal lifetime from about 8000 running hours to about 3000 running hours. Rather than tackling the difficult task of eliminating on-power running of the pumps, Pickering decided to install a more robust seal design that could withstand this. Through the process of competitive tender, AECL's CAN6 seal was chosen. This seal has a successful history in similarly demanding conditions in boiling water reactors in the USA. To supplement this and demonstrate there would be no 'surprises,' a 2000-hour test program was conducted. Testing consisted of simulating all the expected conditions, plus some special tests under abnormal conditions. This has given assurance that the seal will operate reliably in the Pickering shutdown cooling pumps. (author)

  14. Retrofit of AECL CAN6 seals into the Pickering shutdown cooling pumps

    International Nuclear Information System (INIS)

    Rhodes, D.; Metcalfe, R.; Brown, G.; Kiameh, P.; Burchett, P.

    1997-01-01

    The existing mechanical seals in the shutdown cooling (SDC) pumps at the eight-unit Pickering Nuclear Generating Station have caused at least seven forced outages in the last fifteen years. The SDC pumps were originally intended to run only during shutdowns, mostly at low pressure, except for short periods during routine testing of SDC isolation valves while the plant is operating at full pressure to verify that the emergency core injection system is available. Unfortunately, in practice, some SDC pumps must be run much more frequently than this to prevent overheating or freezing of components in the system while the plant is at power. This more severe service has decreased seal lifetime from about 8000 running hours to about 3000 running hours. Rather than tackling the difficult task of eliminating on-power running of the pumps, Pickering decided to install a more robust seal design that could withstand this. Through the process of competitive tender, AECL's CAN6 seal was chosen. This seal has a successful history in similarly demanding conditions in boiling water reactors in the USA. To supplement this and demonstrate there would be no 'surprises,' a 2000-hour test program was conducted. Testing consisted of simulating all the expected conditions, plus some special tests under abnormal conditions. This has given assurance that the seal will operate reliably in the Pickering shutdown cooling pumps. (author)

  15. Current issues in the management of low- and intermediate-level radioactive wastes from Ontario Hydro's CANDU reactors

    International Nuclear Information System (INIS)

    Krasznai, J.P.; Vaughan, B.R.; Williamson, A.S.

    1990-01-01

    Nuclear generating stations (NGSs) in Canada are operated by utilities in Ontario, Quebec, and New Brunswick. Ontario Hydro, with a committed nuclear program of 13,600 MW(electric) is the major producer of CANDU pressurized heavy-water reactor (PHWR) low- and intermediate-level radioactive wastes. All radioactive wastes with the exception of irradiated fuel are processed and retrievably stored at a centralized facility at the Bruce Nuclear Power Development site. Solid-waste classifications and annual production levels are given. Solid-waste management practices at the site as well as the physical, chemical, and radiochemical characteristics of the wastes are well documented. The paper summarizes types, current inventory, and estimated annual production rate of liquid waste. Operation of the tritium recovery facility at Darlington NGS, which removes tritium from heavy water and produces tritium gas in the process, gives rise to secondary streams of tritiated solid and liquid wastes, which will receive special treatment and packaging. In addition to the treatment of radioactive liquid wastes, there are a number of other important issues in low- and intermediate-level radioactive waste management that Ontario Hydro will be addressing over the next few years. The most pressing of these is the reduction of radioactive wastes through in-station material control, employee awareness, and improved waste characterization and segregation programs. Since Ontario Hydro intends to store retrievable wastes for > 50 yr, it is necessary to determine the behavior of wastes under long-term storage conditions

  16. Qualification of PHT piping of Indian 500 MW PHWR for LBB, using R-6 method

    International Nuclear Information System (INIS)

    Rastogi, Rohit; Bhasin, V.; Kushwaha, H.S.

    1997-01-01

    This document discusses the qualification of straight pipe portion of the primary heat transport (PHT) piping of Indian 500 MWe pressurised heavy water reactor (PHWR) for leak before break (LBB). The evaluation is done using R-6 [1] method. The results presented here are: the safety margins which exist on straight pipe components of main PHT piping of 500 MWe, under leakage size crack (LSC) and design basis accident loads; the sensitivity of safety margins with respect to different analysis parameters and the qualification of PHT piping for LBB based on criterion given by NUREG-1061 [2] and TECDOC-774 [3]. (author)

  17. Ontario Hydro's nuclear program

    International Nuclear Information System (INIS)

    McCredie, J.

    1984-01-01

    This report briefly describes Ontario Hydro's nuclear program, examining the design and construction status, and the future from Ontario Hydro's perspective. Ontario Hydro relies heavily on nuclear power. Nuclear fuel was responsible for approximately 34% of Ontario Hydro's energy production in 1983. The nuclear proportion was supplied by twelve operating units located: NPD, Douglas Point, Pickering A and B. It is expected that by approximately 1992, 65% of the total energy needs will be generated through nuclear power

  18. PHWR Fuel - an integrated approach in Indian context

    Energy Technology Data Exchange (ETDEWEB)

    Jayaraj, R.N. [Nuclear Fuel Complex, Dept. of Atomic Energy, Hyderabad (India)

    2008-07-01

    The nuclear power programme in India is based on a three-stage approach in which the Pressurized Heavy Water Reactors (PHWR) forms the backbone of the first stage. Over the years, apart from gaining expertise in design, construction and operation of PHWRs, innovative fuel designs and manufacturing technologies have also been evolved. Presently, thirteen PHWR 220 units and two PHWR 540 units are in operation. Three more PHWR 220 units are in the advanced stage of construction. In addition, the PHWR power generation programme envisages construction of eight more PHWR 700 units. Nuclear Fuel Complex (NFC) at Hyderabad, established in early 70s, is the only manufacturer of fuel and reactor core structurals for all the PHWRs in India. Since inception, the thrust has been on indigenous development of technology in the areas of production processes, equipment manufacture and quality assurance programmes. Commensurate with the PHWR programme, NFC has expanded its production capacities and has fabricated more than 380,000 fuel bundles since inception. Towards optimization of uranium resources and implementation of 'closed fuel cycle' concept, large quantities of reprocessed uranium fuel bundles have been manufactured and introduced in the initial cores of PHWRs. In recent times, NFC introduced several modifications in the production processes like vapour ammonia precipitation for UO{sub 2} powder production, advanced resistance welding controls and improved versions of welding machines, which all have facilitated in improving the quality and productivity of the fuel. Superior quality control systems like spectrophotometric determination of SSA of UO{sub 2} powders, machine vision systems for pellet inspection, thermography for evaluating weld integrity, etc. has channelised NDT techniques into fuel production lines. The paper summarizes various improvements carried out in the design and manufacture of PHWR fuel. New concepts evolved in high burn-up fuels and

  19. Comments on nuclear reactor safety in Ontario

    International Nuclear Information System (INIS)

    1987-08-01

    The Chalk River Technicians and Technologists Union representing 500 technical employees at the Chalk River Nuclear Laboratories of AECL submit comments on nuclear reactor safety to the Ontario Nuclear Safety Review. Issues identified by the Review Commissioner are addressed from the perspective of both a labour organization and experience in the nuclear R and D field. In general, Local 1568 believes Ontario's CANDU nuclear reactors are not only safe but also essential to the continued economic prosperity of the province

  20. Tritium accounting for PHWR plants

    International Nuclear Information System (INIS)

    Nair, P.S.; Duraisamy, S.

    2012-01-01

    Tritium, the radioactive isotope of hydrogen, is produced as a byproduct of the nuclear reactions in the nuclear power plants. In a Pressurized Heavy Water Reactor (PHWR) tritium activity is produced in the Heat Transport and Moderator systems due to neutron activation of deuterium in heavy water used in these systems. Tritium activity build up occurs in some of the water systems in the PHWR plants through pick up from the plant atmosphere, inadvertent D 2 O ingress from other systems or transfer during processes. The tritium, produced by the neutron induced reactions in different systems in the reactor undergoes multiple processes such as escape through leaks, storage, transfer to external locations, decay, evaporation and diffusion and discharge though waste streams. Change of location of tritium inventory takes place during intentional transfer of heavy water, both reactor grade and downgraded, from one system to another. Tritium accounting is the application of accounting techniques to maintain knowledge of the tritium inventory present in different systems of a facility and to construct activity balances to detect any discrepancy in the physical inventories. It involves identification of all the tritium hold ups, transfers and storages as well as measurement of tritium inventories in various compartments, decay corrections, environmental release estimations and evaluation of activity generation during the accounting period. This paper describes a methodology for creating tritium inventory balance based on periodic physical inventory taking, tritium build up, decay and release estimations. Tritium accounting in the PHWR plants can prove to be an effective regulatory tool to monitor its loss as well as unaccounted release to the environment. (author)

  1. The Ontario Hydro approach to assuring quality in nuclear heat exchanger tubing

    International Nuclear Information System (INIS)

    Maka, E.P.

    1982-01-01

    Ontario Hydro utilizes the CANDU PHWR reactor system. The heat transport system circulates pressurized heavy water through the reactor fuel channels to remove heat produced by the fission of uranium fuel. Heavy water is used for the heat transport medium because it is the most efficient liquid from the standpoint of neutron economy. The heat is carried by the reactor coolant to the steam generators where it is transferred to the light water side to form steam which drives the turbine generators. Many heat exchangers are incorporated in the heat transfer cycle. Their integrity is of prime importance both for the reliability of the power plant and for economic reasons since the loss of heavy water at $300/kg is a substantial penalty. This integrity depends largely on the quality of the heat exchanger tubing and where major heat exchangers are involved, it has been the Ontario Hydro policy to supply tubing to heat exchanger manufacturers on a ''free issue'' basis. This allows better control over the level of inspection perform

  2. AECB staff annual assessment of the Pickering A and B Nuclear Generating Stations for the year 1996

    International Nuclear Information System (INIS)

    1997-06-01

    The Atomic Energy Control Board is the independent federal agency that controls all nuclear activities in Canada. A major use of nuclear energy in Canada is electricity production. The AECB assesses every station's performance against legal requirements, including the conditions in the operating licence. Each station is inspected and all aspects of the station's operation and management is reviewed. This report is the AECB staff assessment of reactor safety at the Pickering A and B Generating Stations for 1996. PNGS-A and PNGS-B operated safely during 1996. Although the risk to the workers and the public is low, major safety related changes are necessary at the stations and the sustainability of those changes needs to be demonstrated. Improvement is needed by Ontario Hydro in meeting the time limits for reporting reportable events. Ontario Hydro's follow up to events and causal factor analyses continue to need improvements. Improvements are needed to operational safety and reactor maintenance at both A and B. There are signs of improvement through Ontario Hydro's plan for recovery, and in station management changes. There also appears to be commitment to safety expressed at the highest level of the utility

  3. Condition based maintenance pilot projects at Pickering ND

    International Nuclear Information System (INIS)

    Zemdegs, R.T.

    1995-01-01

    Ontario Hydro has recognized that the approaches to maintenance have undergone significant changes to the past decades. The traditional break down maintenance approach has been replaced by preventative maintenance and more recently, by condition based maintenance. The nuclear plants of Ontario Hydro have evaluated on a number of alternative programs to improve their maintenance effectiveness and to reduce costs, including Reliability Centred Maintenance (RCM), call-up review, component-based PM programs, analysis of failure history and so on. Pickering ND (nuclear division) and Ontario Hydro's Nuclear Technologies Services Division, have embarked on a Condition Based Maintenance pilot project to address the above issues as a breakthrough solution for smarter maintenance. The Condition Based Maintenance pilot project will demonstrate an end-to-end process utilizing a Reliability Centred Maintenance structured approach to re-engineer and redefine the existing maintenance programs. The project emphasizes on-condition maintenance where justified, and utilizes an information management tool to provide the required records keeping and analysis infrastructure. This paper briefly describes the planned maintenance model at Pickering ND used to guide the CBM pilot, and an overview of the methodology used to develop on-condition equipment indicators as part of a re-engineered maintenance plan

  4. Detection of gaseous heavy water leakage points in CANDU 6 pressurized heavy water reactors

    International Nuclear Information System (INIS)

    Park, T-K.; Jung, S-H.

    1996-01-01

    During reactor operation, the heavy water filled primary coolant system in a CANDU 6 Pressurized Heavy Water (PHWR) may leak through routine operations of the plant via components, mechanical joints, and during inadvertent operations etc. Early detection of leak points is therefore important to maintain plant safety and economy. There are many independent systems to monitor and recover heavy water leakage in a CANDU 6 PHWR. Methodology for early detection based on operating experience from these systems, is investigated in this paper. In addition, the four symptoms of D 2 O leakage, the associated process for clarifying and verifying the leakage, and the probable points of leakage are discussed. (author)

  5. Cobalt-60 control in Ontario Hydro reactors

    International Nuclear Information System (INIS)

    Lacy, C.S.

    1988-01-01

    This paper discusses the impact of specifying reduced Cobalt-59 in the primary heat transport circuit materials of construction on the radiation fields developed around the primary circuit. An eight-fold reduction in steam generator radiation fields due to Cobalt-60 has been observed for two identical sets of reactors, one with and one without Cobalt-59 control. The comparison is between eight reactors at the Pickering Nuclear Generating Station (PNGS). Units 5 to 8 (PNGS-B) are identical to Units 1 to 4 (PNGS-A) except that PNGS-B has reduced impurity Cobalt-59 in the alloys of construction and a reduced use of stellite. The effects of chemistry control are also discussed

  6. Proceedings of 2nd PHWR operating safety experience meeting

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1991-04-01

    Papers presented during the eight sessions of the meeting were devoted to the impact of PHWR operating experience on design of civil structures (reactor building integrity); operating experiences related to pressure tubes, nuclear steam supply system, plant stability; reactor maintenance and control systems, reactor operational safety. Some events concerned with reactor shutdown due to power failures are described, as well as action undertaken to prevent major damage.

  7. Proceedings of 2nd PHWR operating safety experience meeting

    International Nuclear Information System (INIS)

    1991-04-01

    Papers presented during the eight sessions of the meeting were devoted to the impact of PHWR operating experience on design of civil structures (reactor building integrity); operating experiences related to pressure tubes, nuclear steam supply system, plant stability; reactor maintenance and control systems, reactor operational safety. Some events concerned with reactor shutdown due to power failures are described, as well as action undertaken to prevent major damage

  8. Consolidating indigenous capability for PHWR fuel manufacturing in India

    Energy Technology Data Exchange (ETDEWEB)

    Jayaraj, R.N., E-mail: cenfc@nfc.gov.in [Nuclear Fuel Complex, Dept. of Atomic Energy, Government of India, Hyderabad (India)

    2010-07-01

    Since inception of Nuclear Power Programme in India greater emphasis was laid on total self- reliance in Fuel manufacturing. For Pressurized Heavy Water Reactors (PHWRs), which forms a base for the first stage of the programme, an integrated approach was adopted encompassing different areas of expertise -Design, Construction and Operation of PHWRs; Heavy Water production and Fuel Design and Manufacturing technologies. For the first PHWR constructed about 35 years back with the Canadian collaboration, known as Rajasthan Atomic Power Station (RAPS), half the core requirement of fuel was met from the fuel manufactured for the first time in India. Since then the fuel production capabilities were enhanced by setting up an industrial scale fuel manufacturing facility - Nuclear Fuel Complex (NFC) at Hyderabad, India during early '70s. NFC has been continuously expanding its capacities to meet the fuel demand of all the PHWRs constructed and operated by Nuclear Power Corporation of India Limited (NPCIL). Presently, fifteen PHWR 220 MWe units and two PHWR 540 MWe units are in operation and one more PHWR 220 MWe unit is in advanced stage of commissioning in India. While continuously engaged in the manufacture of fuel for these reactors, NFC has been upgrading the production lines with new processes and quality assurance systems. In order to multiply the production capacities, NFC has embarked on developing indigenous capability for design and building of special purpose process equipment for Uranium dioxide powder production, pelletisation and final assembly operations. Some of the equipment having state-of-the-art features includes dryers/furnaces for UO{sub 2} powder, presses/ sintering furnaces for pelletisation and resistance welding equipment/ machining stations for assembly operations. In addition, several campaigns were taken over the years for manufacturing PHWR fuel bundles containing reprocessed Uranium, Thoria and slightly enriched Uranium. The paper

  9. Consolidating indigenous capability for PHWR fuel manufacturing in India

    International Nuclear Information System (INIS)

    Jayaraj, R.N.

    2010-01-01

    Since inception of Nuclear Power Programme in India greater emphasis was laid on total self- reliance in Fuel manufacturing. For Pressurized Heavy Water Reactors (PHWRs), which forms a base for the first stage of the programme, an integrated approach was adopted encompassing different areas of expertise -Design, Construction and Operation of PHWRs; Heavy Water production and Fuel Design and Manufacturing technologies. For the first PHWR constructed about 35 years back with the Canadian collaboration, known as Rajasthan Atomic Power Station (RAPS), half the core requirement of fuel was met from the fuel manufactured for the first time in India. Since then the fuel production capabilities were enhanced by setting up an industrial scale fuel manufacturing facility - Nuclear Fuel Complex (NFC) at Hyderabad, India during early '70s. NFC has been continuously expanding its capacities to meet the fuel demand of all the PHWRs constructed and operated by Nuclear Power Corporation of India Limited (NPCIL). Presently, fifteen PHWR 220 MWe units and two PHWR 540 MWe units are in operation and one more PHWR 220 MWe unit is in advanced stage of commissioning in India. While continuously engaged in the manufacture of fuel for these reactors, NFC has been upgrading the production lines with new processes and quality assurance systems. In order to multiply the production capacities, NFC has embarked on developing indigenous capability for design and building of special purpose process equipment for Uranium dioxide powder production, pelletisation and final assembly operations. Some of the equipment having state-of-the-art features includes dryers/furnaces for UO 2 powder, presses/ sintering furnaces for pelletisation and resistance welding equipment/ machining stations for assembly operations. In addition, several campaigns were taken over the years for manufacturing PHWR fuel bundles containing reprocessed Uranium, Thoria and slightly enriched Uranium. The paper summarises

  10. Report of the COG/IAEA international workshop on managing nuclear safety at CANDU (PHWR) plants. Working material

    International Nuclear Information System (INIS)

    1997-01-01

    The workshop, hosted by COG and co-sponsored by the International Atomic Energy Agency (IAEA, Vienna) was held in Toronto, April 28 - May 1st, 1997. The 40 participants included senior managers from IAEA member countries operating or constructing CANDU (PHWR) stations. All the offshore utilities with PHWR stations in Korea, Romania, India, Argentina, Pakistan, and China were present with their domestic counterparts from Ontario Hydro Nuclear, Hydro Quebec, New Brunswick Power, and AECL. The objectives of the workshop were to: provide a forum for exchange of ideas among nuclear safety managers operating CANDU (PHWR) stations and to learn from each other's experiences; to foster sharing of information on different operating approaches to managing safety and, in particular, to highlight the strategies for controlling the overall plant risk to a low level; to identify and discuss issues of mutual interest pertinent to PHWR stations and to define future follow-up activities. Refs, figs

  11. Report of the COG/IAEA international workshop on managing nuclear safety at CANDU (PHWR) plants. Working material

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-01

    The workshop, hosted by COG and co-sponsored by the International Atomic Energy Agency (IAEA, Vienna) was held in Toronto, April 28 - May 1st, 1997. The 40 participants included senior managers from IAEA member countries operating or constructing CANDU (PHWR) stations. All the offshore utilities with PHWR stations in Korea, Romania, India, Argentina, Pakistan, and China were present with their domestic counterparts from Ontario Hydro Nuclear, Hydro Quebec, New Brunswick Power, and AECL. The objectives of the workshop were to: provide a forum for exchange of ideas among nuclear safety managers operating CANDU (PHWR) stations and to learn from each other`s experiences; to foster sharing of information on different operating approaches to managing safety and, in particular, to highlight the strategies for controlling the overall plant risk to a low level; to identify and discuss issues of mutual interest pertinent to PHWR stations and to define future follow-up activities. Refs, figs.

  12. Detection of SBLOCA in the reactor of PHT system of Indian PHWR using GLR method

    Energy Technology Data Exchange (ETDEWEB)

    Chakrabarti, Dipankar [Indian Institute of Technology, Kanpur (India). Nuclear Engineering and Technology Programme

    1990-01-01

    Detection of Small Break Loss of Coolant Accident (SBLOCA) in nuclear power plants is important from the point of view of safety. Generalised Likelihood Ratio (GLR) test is one of the ways to detect faults like leak, controller bias etc. It can differentiate and diagnose different types of faults. A simplified state-space variable model of a PHWR reactor is developed and the utility of GLR method is investigated to detect leaks in the coolant channel in the reactor portion of the primary heat transport (PHT) system. A simple digital control system to control the outlet pressure of the reactor by manipulating the flow rate through the reactor is also developed. The results indicate that a leak of magnitude as low as 0.25% of the total flow rate through one coolant channel can be detected efficiently and promptly by this method. For instance a leak was detected within 3 minutes properly for 97 times out of 100 leaks simulated. (M.G.B.). 20 refs., 1 appendix.

  13. Review of Ontario Hydro Pickering 'A' and Bruce 'A' nuclear generating stations' accident analyses

    International Nuclear Information System (INIS)

    Serdula, K.J.

    1988-01-01

    Deterministic safety analysis for the Pickering 'A' and Bruce 'A' nuclear generating stations were reviewed. The methodology used in the evaluation and assessment was based on the concept of 'N' critical parameters defining an N-dimensional safety parameter space. The reviewed accident analyses were evaluated and assessed based on their demonstrated safety coverage for credible values and trajectories of the critical parameters within this N-dimensional safety parameter space. The reported assessment did not consider probability of occurrence of event. The reviewed analyses were extensive for potential occurrence of accidents under normal steady-state operating conditions. These analyses demonstrated an adequate assurance of safety for the analyzed conditions. However, even for these reactor conditions, items have been identified for consideration of review and/or further study, which would provide a greater assurance of safety in the event of an accident. Accident analyses based on a plant in a normal transient operating state or in an off-normal condition but within the allowable operating envelope are not as extensive. Improvements in demonstrations and/or justifications of safety upon potential occurrence of accidents would provide further assurance of adequacy of safety under these conditions. Some events under these conditions have not been analyzed because of their judged low probability; however, accident analyses in this area should be considered. Recommendations are presented relating to these items; it is also recommended that further study is needed of the Pickering 'A' special safety systems

  14. Comparison of Ontario Hydro's performance with world power reactors - 1981

    International Nuclear Information System (INIS)

    Dumka, B.R.

    1982-04-01

    The performance of Ontario Hydro's CANDU reactors in 1981 is compared with that of 123 world nuclear power reactors rated at 500 MW(e) or greater. The report is based on data extracted from publications, as well as correspondence with a number of utilities. The basis used is the gross capacity factor, which is defined as gross unit generation divided by the perfect gross output for the period of interest. The lowest of the published turbine and generator design ratings is used to determine the perfect gross output, unless the unit has been proven capable of consistently exceeding this value. The first six reactors in the rankings were CANDU reactors operated by Ontario Hydro

  15. Power distribution monitoring and control in 500 MWe PHWR

    International Nuclear Information System (INIS)

    Kumar, A.

    1996-01-01

    The 500 MWe Indian Pressurized Heavy Water Reactor (PHWR) is expected to be commissioned in a few years. It has a relatively large sized core with complex material distribution in comparison to the currently operating 220 MWe PHWRs. The resulting neutronically loosely coupled system demands continuous control of the core power distribution. This paper gives a brief description and analysis of the reactor monitoring and control system proposed for this reactor. (author). 11 refs, 8 figs, 3 tabs

  16. Development of PHWR fuel fabrication in Korea

    International Nuclear Information System (INIS)

    Suh, K.S.; Yang, M.S.; Kim, D.H.; Rim, C.S.

    1988-01-01

    Korea Advanced Energy Research Institute (KAERI) started a research project to develop the PHWR (CANDU) nuclear fuel fabrication technology in 1981. Based on the results of the intensive developmental work, several prototype fuel bundles were fabricated and tested in the Hot Test Loop at KAERI continuously in 1983 and 1984. After that, irradiation test and post-irradiation examination were carried out for two KAERI-made fuel bundles at Chalk River Nuclear Laboratories in Canada in 1984. Since the results of in-pile and out-of-pile tests with prototype fuel bundles proved to be satisfactory, 48 additional fuel bundles were loaded in Wolsung reactor (CANDU) in 1984 and 1985, and all of them were discharged without a defect after excellent performance in the power reactor. In 1985, the Korean government decided that KAERI supplies all the fuel necessary for the Wolsung reactor. For the mass production of nuclear fuel bundle, several process equipment, facilities and automation methods have been improved making use of experience accumulated during research. A quality assurance program was also established, and quality inspection technology was reviewed and improved to fit the mass production. This paper deals with the development experience so far obtained with the design and fabrication of the Korean PHWR fuel

  17. Non-destructive evaluation of stream generator tubes and pressure tubes from the PHWR reactors, using the rotating magnetic field method

    International Nuclear Information System (INIS)

    Premel, D.; Placko, D.; Grimberg, R.; Savin, A.

    2001-01-01

    This work presents a new type of eddy current transducer with a rotating magnetic field devoted to the inspection of steam generator tubes and pressure tubes from the PHWR reactors. A theoretical model has been developed that permits the calculations of the emf induced in the reception coils in the presence of the copper or magnetite deposits, anti-vibration railing and garter springs. (authors)

  18. Dynamic behaviour of a typical PHWR under earthquake load conditions

    International Nuclear Information System (INIS)

    Fischer, U.; Brandt, K.; Krutzik, N.J.

    1984-01-01

    The paper deals with dynamic calculations for a PHWR reactor building founded on rock and on a base isolation system. The zero period accelerations, displacements, mode shapes and the floor response spectra of both calculations are compared. (Author) [pt

  19. AECB staff annual report of Pickering NGS for the year 1991

    International Nuclear Information System (INIS)

    1992-11-01

    The AECB Pickering project staff, in cooperation with AECB staff in Ottawa, monitor the operation of Pickering NGS-A units 1-4 and Pickering NGS-B units 5-8 to ensure that Ontario Hydro operates the station in compliance with the licensing and safety requirements of the Atomic Energy Control Board. This report presents the review of licensing issues and station performance during 1991. Improvement over 1990 station operation occurred in the following areas: availability of special safety systems; reduction of the station external dose; reorganization of station management to improve focus; station chemistry; housekeeping and material condition; fuel handling capability; training of operators and maintenance staff. However, little change occurred and improvement is still needed in the following: compliance with operating licence; system surveillance program; station maintenance; environmental qualification; radiation emergency response; fire and rescue emergency response; limited capability to predict and prevent equipment failures such as the boiler tube failure on unit 5. (L.L.)

  20. Moderator inlet line hanger replacement for Pickering nuclear power station

    International Nuclear Information System (INIS)

    Kirkpatrick, R.A.; Bowman, J.M.; Symmons, W.R.; El-Nesr, S.

    1988-01-01

    Ontario Hydro's Pickering Nuclear Generating Station (PNGS), Units 1 and 2 were shutdown for large scale fuel channel replacement. Other nonroutine inspection and maintenance activities were performed to determine the overall condition of the units and it was seen that a moderator inlet line hanger (identified as HR-29) had failed in both units. Subsequent inspections during planned maintenance outages of Pickering NGS Units 3 and 4 revealed that hanger HR-29 had failed and required replacement. A research program was conducted to find a suitable technique. These problems included accessing tooling through small inspection ports, manipulating tooling from a significant distance and the high radiation fields within the vault. This paper describes the program undertaken to replace hanger HR-29. (author)

  1. The distribution and abundance of gamma emitting radionuclides in Lake Ontario sediments

    International Nuclear Information System (INIS)

    McKinley, R.S.

    1985-03-01

    The distribution of gamma emitting radionuclides in Lake Ontario sediments was investigated. Samples were collected using a systematic design in the vicinity of Pickering and Darlington, and supplemented by lakewide offshore samples. Naturally occurring 40 K was the predominant source of gamma activity. 60 Co was the only potentially CANDU released radionuclide which showed a distributional association with the Pickering 'A' NGS discharge

  2. MTR and PWR/PHWR in-pile loop safety in integration with the operation of multipurpose reactor - GAS

    International Nuclear Information System (INIS)

    Suharno; Aji, Bintoro; Sugiyanto; Rohman, Budi; Zarkasi, Amin S.; Giarno

    1998-01-01

    MTR and PWR/PHWR In-Pile Loop safety analysis in integration with the operation of Multipurpose Reactor - Gas has been carried out and completed. The assessment is emphasized on the function of the interface systems from the dependence of the operation and the evaluation to the possibility of leakage or failure of the in-pile part inside the reactor pool and reactor core. The analysis is refers to the logic function of the interface system and the possibility of leakage or failure of the in-pile part inside reactor pool and reactor core to consider the integrity of the core qualitatively. The results show that in normal and in transient conditions , the interface system meet the function requirement in safe integrated operation of in-pile loop and reactor. And the results of the possibility analysis of the leakage shows that the possibility based on mechanically assessment is very low and the impact to core integrity is nothing or can be eliminated. The possible position for leakage is on the flen on which one meter above the top level of the core, therefore no influence of leakage to the core

  3. Status of generic actions items and safety analysis system of PHWR

    Energy Technology Data Exchange (ETDEWEB)

    Park, Joo Hwan; Min, Byung Joo

    2001-05-01

    This report described the review results of a GAIs(Generic Action Item) currently issued on safety analysis of PHWR(Pressurized Heavy Water Reactor) and the research activities and positions to solve the GAIs in each country which possess PHWRs. eviewing the Final Safety Analysis Report for Wolsong-2/3/4 Units, the safety analysis methodology, classification for accident scenarios, safety analysis codes, their interface, etc.. were described. From the present review report, it is intended to establish the CANDU safety analysis system by providing the better understandings and development plans for the safety analysis of PHWR. esults.

  4. Use of gadolinium as neutron poison in 540 MWe PHWR

    International Nuclear Information System (INIS)

    Nag, P.K.; Fernando, M.P.S.; Kumar, A.N.

    2006-01-01

    In Pressurised heavy water reactors (PHWRs), neutron poison in the moderator is used to compensate the excess reactivity present in the core on different occasions such as xenon decay during synchronization just after poison out period or start ups from xenon free conditions. It is also used in secondary shutdown system (SDS-2), where required amount of neutron poison is injected directly into the moderator within 2.5 seconds. Further, it is also used for over poisoning the moderator to achieve the guaranteed shutdown state when the regular shutdown systems are taken for maintenance. Generally, two types of moderator poisons are used in power reactors to balance the reactivity of the core and they are boron and gadolinium. Gadolinium is used in the form of gadolinium nitrate (Gd(NO 3 ) 3 .6H 2 O). The paper gives the details of estimation of reactivity coefficients of gadolinium for 540 MWe PHWR for different operating conditions. These neutron poisons are converted into non-absorbing elements and therefore their effective worth will decrease as reactor operation proceeds. The rate of burning of neutron absorbing isotopes depends on its magnitude of absorption cross-section and thermal flux seen by them. The present study discusses the burning characteristics of gadolinium during power operation in 540 MWe PHWR. It is established by detailed analysis that the rate of positive reactivity realized due to burning of neutron absorbing Gd isotopes almost match with the build up rate of xenon. The burning half lives of boron and gadolinium is worked out for different power levels. (author)

  5. Quality evaluation of PHWR fuel element end cap weld joints by ultrasonic testing technique

    Energy Technology Data Exchange (ETDEWEB)

    Singh, J L; Nair, V R; Ramadasan, E; Majumdar, S; Sahoo, K C [Bhabha Atomic Research Centre, Bombay (India). Radiometallurgy Div.; Kumar, Arun [Atomic Fuel Fabrication Facility, Tarapur (India)

    1994-12-31

    An ultrasonic testing technique has been developed for effective quality evaluation of Pressurised Heavy Water Reactor (PHWR) fuel end plug welds. A focused high frequency shear wave is directed to the weld zone from half skip distance to detect lack of fusion, porosities and wall cracks in the weld zone. A tentative select/reject level has been evolved to sort out the defective weld by examining more than 700 PHWR fuel pin welds. (author). 5 refs., 5 figs.

  6. Ontario Hydro's nuclear program

    International Nuclear Information System (INIS)

    Jackson, H.A.

    1982-06-01

    In 1981 Ontario Hydro generated over 100 billion KWh of electrical energy. Approximately one third of this was from nuclear units. There are ten CANDU units (5 250 MW) currently in operation, and another twelve (8 600 MW) are under construction. The presently committed nuclear expansion program is estimated to involve expenditures of 16 billion dollars over the next 10 years. About 10 000 people are employed in the nuclear design and construction program. All projects are generally on schedule, with the stations coming into service during the following time periods: Pickering B, 1983-85; Bruce B, 1984-87; Darlington, 1988-90. The status of each project is reviewed. Planning is underway for some retubing projects, as early as 1985 for Pickering A

  7. Pickering NGS A reactor building 1 dome refurbishment long-term monitoring of coating

    International Nuclear Information System (INIS)

    Deans, J.J.; Chan, P.; Gomme, R.

    2006-01-01

    'Full text:' To reduce air leakage through the dome of Pickering NGS A Reactor Building 1, in August 1993 a portion of the exterior concrete surface was coated with a single component elastomeric polyurethane material. An internal positive pressure test of the building, conducted between November 5 and 7, 1993, found that the air leakage rates were significantly lower in this test than leakage rates which had been measured during a pressure test conducted in 1992. This reduction in leakage was attributed to the successful performance of the coating. The need for a high-performance, elastomeric surface coating was identified for reduction of air leakage levels through the dome of Reactor Building l of Ontario Power Generation's (formerly Ontario Hydro's) Pickering 'A' Nuclear Generating Station near Toronto. A number of candidate coatings were extensively tested to assess the performance characteristics and identify a material that could withstand the elements and perform effectively for around 20 years. Under normal operating conditions, a licensing limit of 2.7% of contained mass/hour is set for permissible containment leakage whilst the operational working target is less than 1%. The facility's engineers determined that any leakages were pressure-dependent, so in an effort to remain well within their working target, they sought a system that would bridge and seal any hairline cracks in the concrete dome and thereby prevent the passage of gas or vapour through the substrate. On the basis of scheduling and cost, they concluded that a high performance coating was most appropriate for the project, and hired Kinectrics (formerly Ontario Hydro Technologies (OHT)) to select, test, assess and arrange for the application to the RB 1 Dome. In all, nearly 70 separate manufacturers were approached by Kinectrics with a view to obtaining recommendations for treatment. The respective performance data of the respondents' products were compared with a set of specific design

  8. Advanced methods for fabrication of PHWR and LMFBR fuels

    International Nuclear Information System (INIS)

    Ganguly, C.

    1988-01-01

    For self-reliance in nuclear power, the Department of Atomic Energy (DAE), India is pursuing two specific reactor systems, namely the pressurised heavy water reactors (PHWR) and the liquid metal cooled fast breeder reactors (LMFBR). The reference fuel for PHWR is zircaloy-4 clad high density (≤ 96 per cent T.D.) natural UO 2 pellet-pins. The advanced PHWR fuels are UO 2 -PuO 2 (≤ 2 per cent), ThO 2 -PuO 2 (≤ 4 per cent) and ThO 2 -U 233 O 2 (≤ 2 per cent). Similarly, low density (≤ 85 per cent T.D.) (UPu)O 2 pellets clad in SS 316 or D9 is the reference fuel for the first generation of prototype and commercial LMFBRs all over the world. However, (UPu)C and (UPu)N are considered as advanced fuels for LMFBRs mainly because of their shorter doubling time. The conventional method of fabrication of both high and low density oxide, carbide and nitride fuel pellets starting from UO 2 , PuO 2 and ThO 2 powders is 'powder metallurgy (P/M)'. The P/M route has, however, the disadvantage of generation and handling of fine powder particles of the fuel and the associated problem of 'radiotoxic dust hazard'. The present paper summarises the state-of-the-art of advanced methods of fabrication of oxide, carbide and nitride fuels and highlights the author's experience on sol-gel-microsphere-pelletisation (SGMP) route for preparation of these materials. The SGMP process uses sol gel derived, dust-free and free-flowing microspheres of oxides, carbide or nitride for direct pelletisation and sintering. Fuel pellets of both low and high density, excellent microhomogeneity and controlled 'open' or 'closed' porosity could be fabricated via the SGMP route. (author). 5 tables, 14 figs., 15 refs

  9. Neutron radiography for quality assurance of PHWR fuel pins

    International Nuclear Information System (INIS)

    Chandrasekharan, K.N.; Patil, B.P.; Ghosh, J.K.; Ganguly, C.

    1993-01-01

    Neutron radiography was employed for quality assurance (QA) for advanced PHWR experimental fuel pins containing mixed uranium-plutonium dioxide and thorium-plutonium dioxide pellets. Direct, transfer and track-etch techniques were utilised. The thermal neutron beam facility of APSARA research reactor at Bhabha Atomic Research Centre was used. (author). 5 refs., 16 figs., 2 tabs

  10. Dynamic Analysis of Coolant Channel and Its Internals of Indian 540 MWe PHWR Reactor

    Directory of Open Access Journals (Sweden)

    A. Rama Rao

    2008-04-01

    Full Text Available The horizontal coolant channel is one of the important parts of primary heat transport system in PHWR type of reactors. There are in all 392 channels in the core of Indian 540 MWe reactor. Each channel houses 13 natural uranium fuel bundles and shielding and sealing plugs one each on either side of the channel. The heavy water coolant flows through the coolant channel and carries the nuclear heat to outside the core for steam generation and power production in the turbo-generator. India has commissioned one 540 MWe PHWR reactor in September 2005 and another similar unit will be going into operation very shortly. For a complete dynamic study of the channel and its internals under the influence of high coolant flow, experimental and modeling studies have been carried out. A good correlation has been achieved between the results of experimental and analytical models. The operating life of a typical coolant channel typically ranges from 10 to 15 full-power years. Towards the end of its operating life, its health monitoring becomes an important activity. Vibration diagnosis plays an important role as a tool for life management of coolant. Through the study of dynamic characteristics of the coolant channel under simulated loading condition, an attempt has been made to develop a diagnostics to monitor the health of the coolant channel over its operating life. A study has been also carried out to characterize the fuel vibration under different flow condition.

  11. Integrated probabilistic assessment for DHC initiation, growth and leak-before-break of PHWR pressure tubes

    Energy Technology Data Exchange (ETDEWEB)

    Oh, Young-Jin [Power Engineering Research Institute, KEPCO Engineering and Construction, 188 Gumi-dong, Bundang-gu, Seongnam-si, Gyeonggi-do 463-870 (Korea, Republic of); Chang, Yoon-Suk, E-mail: yschang@khu.ac.kr [Department of Nuclear Engineering, Kyung Hee University, 1732 Deogyeong-daero, Giheung-gu, Yongin-si, Gyeonggi-do 446-701 (Korea, Republic of)

    2014-08-15

    Highlights: • We develop an integrated approach for probabilistic assessment of PHWR pressure tube. • We examine probabilities of DHC initiation, growth, penetration and LBB failure. • The proposed approach is helpful to calculate rupture probabilities in reactor flaws even in the case of very low rupture probability. - Abstract: A few hundred zirconium alloy pressure tubes in a pressurized heavy water reactor (PHWR) serve as the nuclear fuel channel, as well as the reactor coolant pressure boundary. The pressure tubes are inspected periodically and a fitness-for-service assessment (FFSA) must be conducted if any flaw is detected in the inspection. A Canadian standard provides FFSA procedures of PHWR pressure tubes, which include probabilistic assessment for flaws considering delayed hydride cracking (DHC) and leak-before-break (LBB). In the present study, an integrated approach with detailed stepwise calculation procedures and integration methodology for probabilistic assessment of pressure tube was developed. In the first step of this approach, a probability of the DHC initiation, growth and penetration for single initial flaw is calculated. In the next step, a probability of LBB failure, which means tube rupture, for single through-wall crack (TWC) is calculated. Finally, a rupture probability for all initial flaws in a reactor can be calculated using the penetration probability for single flaw and the LBB failure probability for single TWC, as well as the predicted total number of initial flaw in the reactor.

  12. Integrated probabilistic assessment for DHC initiation, growth and leak-before-break of PHWR pressure tubes

    International Nuclear Information System (INIS)

    Oh, Young-Jin; Chang, Yoon-Suk

    2014-01-01

    Highlights: • We develop an integrated approach for probabilistic assessment of PHWR pressure tube. • We examine probabilities of DHC initiation, growth, penetration and LBB failure. • The proposed approach is helpful to calculate rupture probabilities in reactor flaws even in the case of very low rupture probability. - Abstract: A few hundred zirconium alloy pressure tubes in a pressurized heavy water reactor (PHWR) serve as the nuclear fuel channel, as well as the reactor coolant pressure boundary. The pressure tubes are inspected periodically and a fitness-for-service assessment (FFSA) must be conducted if any flaw is detected in the inspection. A Canadian standard provides FFSA procedures of PHWR pressure tubes, which include probabilistic assessment for flaws considering delayed hydride cracking (DHC) and leak-before-break (LBB). In the present study, an integrated approach with detailed stepwise calculation procedures and integration methodology for probabilistic assessment of pressure tube was developed. In the first step of this approach, a probability of the DHC initiation, growth and penetration for single initial flaw is calculated. In the next step, a probability of LBB failure, which means tube rupture, for single through-wall crack (TWC) is calculated. Finally, a rupture probability for all initial flaws in a reactor can be calculated using the penetration probability for single flaw and the LBB failure probability for single TWC, as well as the predicted total number of initial flaw in the reactor

  13. Introduction of developing a list of MSO generic scenarios for PHWR

    Energy Technology Data Exchange (ETDEWEB)

    Park, Jae Wan; Park, Jun Hyun; Bae, Hui Soo [STANDARD Testing and Engineering Ing. Ltd, Daejeon (Korea, Republic of)

    2016-10-15

    Multiple Spurious Operation(MSO) scenarios should contain scenarios threatening Post-fire safe shutdown function by MSO of Safe Shutdown Equipments(SSEs) as well as Non-SSEs. The list of MSO generic scenarios(NEI 00-01, Appendix G) was developed by industrial survey. Although not all scenarios of the list of MSO generic scenarios(NEI 00-01, Appendix G) are considered applicable to every reactor type, this list provides an input about MSO identification and treatment process. If NEI 00-01 is applied to other reactor type, analyst should review applicability of the list of generic scenarios(NEI 00-01, Appendix G) and consider potential MSO scenarios undescribed in the list of MSO generic scenarios(NEI 00-01, Appendix G). Especially, in PHWR case, there is no list of MSO generic scenarios in Canada or internationally. There are substantial physical variations between NPPs. So some generic scenarios(NEI 00-01, Appendix G) would need validation. Nevertheless, industrial stakeholder have not did any MSO work until now. In this paper, results of first stage research that develop the list of MSO generic scenarios for pressurized heavy water reactor(PHWR) is introduced. According to the review results, specific review of the list of MSO generic scenarios(NEI 00-01, Appendix G) is required such as how it applies to PHWR. And criteria was established for review of availability of the list of generic scenarios(NEI 00-01, Appendix G). However there are still many tasks such as potential scenario review, risk model review and expert panel review.

  14. Revitalizing the nuclear business at Ontario Hydro

    International Nuclear Information System (INIS)

    Talbot, K.

    1994-01-01

    Ontario Hydro, North America's largest electric power utility, with an installed capacity of 34,000 MW, has under gone a major restructuring over the past year to better align itself with a changing electricity market and evolving customer needs. The single largest new business unit within the new Ontario Hydro is Ontario Hydro Nuclear (OHN), responsible for engineering, operation and maintenance of the Corporation's 20 large nuclear units at three generating sites, OHN faces a significant challenge in returning Ontario's nuclear units to the world-leading performance levels they enjoyed in the past, particularly the older Pickering A and Bruce A plants. However, steady progress is being made as evidenced by improving peer reviews and overall capacity and financial performance

  15. Material and fabrication considerations for the CANDU-PHWR heat transport system

    International Nuclear Information System (INIS)

    Filipovic, A.; Price, E.G.; Barber, D.; Nickerson, J.

    1987-03-01

    CANDU PHWR nuclear systems have used carbon steel material for over 25 years. The accumulated operating experience of over 200 reactor years has proven this unique AECL approach to be both technically and economically attractive. This paper discusses design, material and fabrication considerations for out-reactor heat transport system major components. The contribution of this unique choice of materials and equipment to the outstanding CANDU performance is briefly covered

  16. Process systems of PHWR - Indian experience

    Energy Technology Data Exchange (ETDEWEB)

    Ramandan, T S.V. [Madras Atomic Power Station (MAPS), Madras (India)

    1991-04-01

    Three operational problems are discussed in this paper. The reactors in Madras Atomic Power Station (MAPS), India are Pressurised Heavy Water Reactors PHWR), similar to Douglas Point PGS. The moderator heavy water is pumped into the bottom half of the calandria (horizontal reactor vessel) through one inlet manifold plenum chamber and horizontal louvers which help to distribute the moderator evenly at a very low velocity. The outlet from the calandria is through a smaller manifold structure at a higher elevation. The moderator is held on the shell side of the calandria by means of helium gas pressure differential between top of calandria and dump tank located below. The primary coolant system consists of 306 coolant channels containing the fuel and steam generators (SGs) and pumps on either side of the reactor. Each SC consists of 11 Nos. inverted U tube vertical heat exchangers where heat is transferred from primary coolant heavy water to secondary light water to produce steam. (author)

  17. Process systems of PHWR - Indian experience

    International Nuclear Information System (INIS)

    Ramandan, T.S.V.

    1991-01-01

    Three operational problems are discussed in this paper. The reactors in Madras Atomic Power Station (MAPS), India are Pressurised Heavy Water Reactors PHWR), similar to Douglas Point PGS. The moderator heavy water is pumped into the bottom half of the calandria (horizontal reactor vessel) through one inlet manifold plenum chamber and horizontal louvers which help to distribute the moderator evenly at a very low velocity. The outlet from the calandria is through a smaller manifold structure at a higher elevation. The moderator is held on the shell side of the calandria by means of helium gas pressure differential between top of calandria and dump tank located below. The primary coolant system consists of 306 coolant channels containing the fuel and steam generators (SGs) and pumps on either side of the reactor. Each SC consists of 11 Nos. inverted U tube vertical heat exchangers where heat is transferred from primary coolant heavy water to secondary light water to produce steam. (author)

  18. Ontario Power Generation Nuclear: results and opportunities

    International Nuclear Information System (INIS)

    Dermarkar, F.

    2006-01-01

    This paper describes the accomplishments of Ontario Power Generation (OPG) Nuclear and outlines future opportunities. OPG's mandate is to cost effectively produce electricity, while operating in a safe, open and environmentally responsible manner. OPG's nuclear production has been increasing over the past three years - partly from the addition of newly refurbished Pickering A Units 1 and 4, and partly from the increased production from Darlington and Pickering B. OPG will demonstrate its proficiency and capability in nuclear by continuing to enhance the performance and cost effectiveness of its existing operations. Its priorities are to focus on performance excellence, commercial success, openness, accountability and transparency

  19. Pickering Nuclear site wide groundwater monitoring system

    International Nuclear Information System (INIS)

    DeWilde, J.; Chin-Cheong, D.; Lledo, C.; Wootton, R.; Belanger, D.; Hansen, K.

    2001-01-01

    Ontario Power Generation Inc. (OPG) is continuing its efforts to understand the chemical and physical characteristics of the groundwater flow systems beneath the Pickering Nuclear Generating Station (PNGS). To this end, OPG constructed a site-wide Groundwater Monitoring System (GMS) at the PNGS to provide support to other ongoing environmental investigations and to provide a means to monitor current and future groundwater environmental issues. This paper will present the results of this work, including the development of a state-of-the-art data management system for storage and retrieval of environmental data for the site, which has applications for other power generation facilities. (author)

  20. Performance of containment of Indian PHWR

    International Nuclear Information System (INIS)

    Mohan, Nalini; Ghadge, S.G.; Bajaj, S.S.

    2006-01-01

    This paper summarizes the various requirements and activities relevant to the testing of containment system of Indian Pressurized Heavy Water Reactor (PHWR). All Indian PHWR containments are constructed from concrete either reinforced or prestressed or a combination of both and lined with polymeric coating based on Epoxy or Vinyl in order to achieve the leak tightness necessary from the radiological considerations following an accident. The current concept includes a complete double containment (except the base raft) extended to all penetrations and some of the pipings (those open to the containment atmosphere). The primary containment fitted with a passive pressure suppression system is enveloped in the secondary containment (confinement) where slight vacuum is maintained during normal operation as well as post accident condition. The Integrated leakage Rate Test (ILRT) conducted so far on the containment indicate that the overall leakages from the containment are lower than those necessary to meet the radiological limits following a postulated accident and interception of leakages by secondary containment as per design. The details of the, tests, repairs carried out and observations are given in this paper. The experience of ILRT also indicate improvement in leak tightness in many areas. (author)

  1. Transforming Ontario's Power Generation Company

    International Nuclear Information System (INIS)

    Manley, J.; Epp, J.; Godsoe, P.C.

    2004-01-01

    The OPG Review Committee was formed by the Ontario Ministry of Energy to provide recommendations and advice on the future role of Ontario Power Generation Inc. (OPG) in the electricity sector. This report describes the future structure of OPG with reference to the appropriate corporate governance and senior management structure. It also discusses the potential refurbishing of the Pickering A nuclear generating Units 1, 2 and 3. The electricity system in Ontario is becoming increasingly fragile. The province relies heavily on electricity imports and the transmission system is being pushed to near capacity. Three nuclear generating units are out of service. The problems can be attributed to the fact that the electricity sector has been subjected to unpredictable policy changes for more than a decade, and that the largest electricity generator (OPG) has not been well governed. OPG has had frequent senior management change, accountability has been weak, and cost overruns have delayed the return to service of the Pickering nuclear power Unit 4. It was noted that the generating assets owned and operated by OPG are capable of providing more than 70 per cent of Ontario's electricity supply. Decisive action is needed now to avoid a potential supply shortage of about 5,000 to 7,000 megawatts by 2007. In its current state, OPG risks becoming a burden on ratepayers. Forty recommendations were presented, some of which suggest that OPG should become a rate-regulated commercial utility focused on running and maintaining its core generating assets. This would require that the government act as a shareholder, and the company operate like a commercial business. It was also emphasized that the market must be allowed to bring in new players. refs., tabs., figs

  2. Use of artificial neural network in estimating channel power distribution of a 220 MWe PHWR

    International Nuclear Information System (INIS)

    Dubey, B.P.; Chandra, A.K.; Govindarajan, G.; Jagannathan, V.; Kataria, S.K.

    1998-01-01

    Knowledge of the distribution of power in all the 306 channels of a Pressurised Heavy Water Reactor (PHWR) as a result of the movement of one or more of the four regulating rods is important from the operation and maintenance point view of the reactor. Conventional computer codes available for this purpose take several minutes to calculate the channel power distribution on PC-AT/486. An Artificial Neural network (ANN), based on the RPROP algorithm has been developed and employed in predicting channel power distribution of a 220 MWe Indian PHWR as a result of a perturbation caused by the movement of one or more of the four regulating rods of the reactor. The ANN based system produces the result of an analysis much faster than that produced by a conventional computer code usually employed for this application. The ANN based system is rugged, accurate and fast, and therefore, has potential to be used in real-time applications. (author)

  3. Simulation of hot-channel transients for PHWR reactors

    International Nuclear Information System (INIS)

    Masriera, N.A.

    1988-01-01

    For the simulation of transients a whole-plant code is needed. These codes model the core in a very simplified way. When local variables have to be calculated a different kind of code is needed: a subchannel-code. This report studies the use of the cobra code as a subchannel-code, for the simulation of a PHWR fuel channel, considering that this code was developed for PWR cores calculation. A special effort is made to obtain optimized models for different calculations: steady state, soft transients and severe transients. These models differ in number of subchannels, axial nodes, and the choice of the most important variables. (Author) [es

  4. Steps to Advanced CANDU 600

    International Nuclear Information System (INIS)

    Oh, Yongshick; Brooks, G. L.

    1988-01-01

    The CANDU nuclear power system was developed from merging of AECL heavy water reactor technology with Ontario Hydro electrical power station expertise. The original four units of Ontario Hydro's Pickering Generating Station are the first full-scale commercial application of the CANDU system. AECL and Ontario Hydro then moved to the next evolutionary step, a more advanced larger scale design for four units at the Bruce Generating Station. CANDU 600 followed as a single unit nuclear electric power station design derived from an amalgam of features of the multiple unit Pickering and Bruce designs. The design of the CANDU 600 nuclear steam supply system is based on the Pickering design with improvements derived from the Bruce design. For example, most CANDU 600 auxiliary systems are based on Bruce systems, whereas the fuel handling system is based on the Pickering system. Four CANDU 600 units are in operation, and five are under construction in Romania. For the additional four units at Pickering Generating Station 'B', Ontario Hydro selected a replica of the Pickering 'A' design with limited design changes to maintain a high level of standardization across all eight units. Ontario Hydro applied a similar policy for the additional four units at Bruce Generating Station 'B'. For the four unit Darlington station, Ontario Hydro selected a design based on Bruce with improvements derived from operating experience, the CANDU 600 design and development programs

  5. Design aspects of PHWR for improved performance

    International Nuclear Information System (INIS)

    Das, M.

    1989-01-01

    The PHWR fuel bundle is elegantly simple in design consisting of only six components. The unique features of the design include high density natural UO 2 pellets, collapsible zircaloy cladding, no gas plenums and short (50 cm), simple bundle configuration. Over the last 20 years, considerable efforts have been expended and still being continued on development of analytical tools and computer codes generation of technical specifications tests and experimental studies type tests on prototype bundles irradiation of special documented fuel bundles in power reactors and monitoring and analysis of fuel performance. The knowledge thus gained has helped us to modify design requirements, relax technical specifications and to evolve new, improved designs. The PHWR fuel technology in India can now be considered as well proven but there is considerable scope for further improvements both in design and manufacturing. For example, in design, use of thinner wall cladding (to improve burn up) bundle design with graded elements, double dished pellet, improved coatings, use of MOX fuel etc. are being explored. On the manufacturing side emphasis need to be given on maintaining the quality, improvement on production and process control. The use of automation and advances in machine control techniques, for example, using micro processors can effectively contribute to improvements in quality, productivity and lowering of fuel fabrication costs. In this paper, the PHWR fuel design features, different fuel designs evolved, fuel specifications, influence of fabrication variables and future direction in improved fuel performance are discussed. (author) 9 refs., 7 figs

  6. An integrated approach for safer, productive and reliable PHWR fuel manufacturing at NFC

    International Nuclear Information System (INIS)

    Saibaba, N.

    2013-01-01

    India has been pursuing three-stage nuclear power programme and has developed comprehensive capabilities in all aspects of nuclear power and fuel cycle and is now recognized as a country with advanced nuclear technologies in the comity of nations. The first stage of Pressurized Heavy Water Reactors (PHWRs) based on natural uranium has reached a state of maturity. In view of civilian nuclear safeguards agreement with NSG and IAEA, Nuclear Power Reactors in India and associated fuel manufacturing facilities at Nuclear Fuel Complex (NFC) are grouped into IAEA safeguarded and out-of-safeguarded facilities. The civilian nuclear energy generation has to be accelerated for achieving energy security for the country. NFC has pioneered manufacturing technologies of UO 2 fuel, fuel clad and structural components for the PHWRs 220, 540 and PHWR700. Nearly 20 GWe of nuclear energy generation is being planned through PHWR route. Several technological improvements that were carried out recently in the production lines are the key to achieve higher productivity and safety. NFC has also been pursuing capacity augmentation by adding newer equipment in the existing facility and setting up new plants both for uranium production as well as zirconium production. Flexible manufacturing systems consisting of automatic workstations and robots were introduced in the 19 and 37 element PHWR fuel assembly lines. Various safety measures were introduced right from design stage for improving radiological safety for workmen. State-of-art equipment were designed, developed and commissioned for reduction/elimination of fatigue-oriented operations. In addition to natural uranium oxide fuel, NFC has also successfully manufactured virgin slightly enriched uranium (SEU) fuel and reprocessed depleted uranium fuels which were irradiated in the operating PHWRs. The paper brings out NFC's role in Indian nuclear power program and its manufacturing capabilities for types of PHWR fuel, zircaloy structural

  7. Analysis of log rate noise in Ontario's CANDU reactors

    Energy Technology Data Exchange (ETDEWEB)

    Hinds, H.W. [Dynamic Simulation and Analysis Corp., Deep River, Ontario (Canada); Banica, C.; Arguner, D. [Ontario Power Generation, Ajax, Ontario (Canada); Scharfenberg, R. [Bruce Power, Tiverton, Ontario (Canada)

    2007-07-01

    In the fall of 2003, the operators noticed that in the recently-refurbished Bruce A Shutdown System no. 1 (SDS1) the noise level in Log Rate signals were much larger than before. At the request of the Canadian Nuclear Safety Commission (CNSC), all Canadian CANDU reactors took action to characterize their Log Rate noise. Staff of the Inspection and Maintenance Services division of Ontario Power Generation (OPG) has collected high-speed high-accuracy noise data from nearly all 16 Ontario reactors, either as part of routine measurements before planned outages or as a dedicated noise recording. This paper gives the results of examining a suitable subset of this data, with respect to the characteristics and possible causes of Log Rate noise. The reactor and instrumentation design is different at each station: the locations of the moderator injection nozzles, the location of the ion chambers for each system, and the design of the Log Rate amplifiers. It was found that the Log noise (source of Log Rate noise) was much larger for those ion chambers in the path of the moderator injection nozzles, compared to those which were not in the path. This 'extra' Log noise would then be either attenuated or amplified depending on the transfer function (time constants) of the Log Rate amplifier. It was also observed that most of the Log and Log Rate noise is independent of any other signal measured. Although all CANDU reactors in Ontario have Log and Log Rate noise, the Bruce A SDS1 system has the largest amount of Log Rate noise, because (a) its SDS1 (and RRS) ion chambers are at the top of the reactor in the path of the moderator injection nozzles, and (b) its SDS1 Log Rate amplifiers have the smallest time constants. (author)

  8. Development and Application of MCNP5 and KENO-VI Monte Carlo Models for the Atucha-2 PHWR Analysis

    Directory of Open Access Journals (Sweden)

    M. Pecchia

    2011-01-01

    Full Text Available The geometrical complexity and the peculiarities of Atucha-2 PHWR require the adoption of advanced Monte Carlo codes for performing realistic neutronic simulations. Core models of Atucha-2 PHWR were developed using both MCNP5 and KENO-VI codes. The developed models were applied for calculating reactor criticality states at beginning of life, reactor cell constants, and control rods volumes. The last two applications were relevant for performing successive three dimensional neutron kinetic analyses since it was necessary to correctly evaluate the effect of each oblique control rod in each cell discretizing the reactor. These corrective factors were then applied to the cell cross sections calculated by the two-dimensional deterministic lattice physics code HELIOS. These results were implemented in the RELAP-3D model to perform safety analyses for the licensing process.

  9. The attached algae community near Pickering GS: III

    International Nuclear Information System (INIS)

    McKinley, S.R.

    1982-01-01

    The relationship between attached algae and macro-invertebrates in the nearshore zone of Lake Ontario was investigated in the vicinity of the Pickering 'A' NGS. Measures of faunal density, richness, evenness, and biomass were generally higher from areas which supported attached algae. Gammarus fasciatus, Cricotopus bicinctus, Dicrotendipes spp., Orthocladius obumbratus, Cladotanytarsus spp., Orthocladius spp., and Parakiefferiella spp., were significantly correlated with algal standing crop. All of the above dominant invertebrates ingested epiphytes associated with Cladophora glomerata. Attempts to explain the distribution of the zoobenthic assemblages using the physical/biological characteristics of the study area indicated algal cover, substrate size, wind velocity and water temperature were most important

  10. Cobalt-60 production in CANDU power reactors

    International Nuclear Information System (INIS)

    Slack, J.; Norton, J.L.; Malkoske, G.R.

    2003-01-01

    therapy machines. Today the majority of the cancer therapy cobalt-60 sources used in the world are manufactured using material from the NRU reactor in Chalk River. The same technology that was used for producing cobalt-60 in a research reactor was then adapted and transferred for use in a CANDU power reactor. In the early 1970s, in co-operation with Ontario Power Generation (formerly Ontario Hydro), bulk cobalt-60 production was initiated in the four Pickering A CANDU reactors located east of Toronto. This was the first full scale production of millions of curies of cobalt-60 per year. As the demand and acceptance of sterilization of medical products grew, MDS Nordion expanded its bulk supply by installing the proprietary Canadian technology in additional CANDUs. Over the years MDS Nordion has partnered with CANDU reactor owners to produce cobalt-60 at various sites. CANDU reactors that have, or are still producing cobalt-60, include Pickering A, Pickering B, Gentilly 2, Embalse in Argentina, and Bruce B. In conclusion, the technology for cobalt-60 production in CANDU reactors, designed and developed by MDS Nordion and Atomic Energy of Canada, has been safely, economically and successfully employed in CANDU reactors with over 195 reactor years of production. Today over forty percent of the world's disposable medical supplies are made safer through sterilization using cobalt-60 sources from MDS Nordion. Over the past 40 years, MDS Nordion with its CANDU reactor owner partners, has safely and reliably shipped more than 500 million curies of cobalt-60 sources to customers around the world. MDS Nordion is presently adding three more CANDU power reactors to its supply chain. These three additional cobalt producing CANDU's will help supplement the ability of the health care industry to provide safe, sterile, medical disposable products to people around the world. As new applications for cobalt-60 are identified, and the demand for bulk cobalt-60 increases, MDS Nordion and AECL

  11. The safety of Ontario's nuclear power reactor. A scientific and technical review. Report to the Minister

    International Nuclear Information System (INIS)

    Hare, F.K.

    1988-01-01

    In December 1986 a study of the safety of the design, operating procedures and emergency plans associated with Ontario Hydro's nuclear generating plants was commissioned by the government of the province of Ontario. After receiving briefs from many interested groups and individuals, visiting the power plants, and consulting with nuclear industry and regulatory representatives in Canada and other countries, the commissioner presented this report to the Minister of Energy for Ontario. His major conclusion is that Ontario Hydro reactors are being operated safely and at high standards of technical performance. No significant adverse impact has been detected in either the work force or the public. The risk of accidents serious enough to affect the public adversely can never be zero, but is very remote. Major recommendations are that: Ontario Hydro re-examine its operational organization closely and commission a study of factors affecting human performance; and, that priority be given to finding a solution to pressure tube performance problems and to improving in-reactor monitoring. Sixteen other recommendations are presented relating to research and development, information exchange with other organizations, reactor performance, training, severe accident analysis, the provincial nuclear emergency plan, epidemiological studies, the Atomic Energy Control Board, public hearings, and women in the nuclear industry

  12. Pickering NGS-A versus Pickering NGS-B: changes in commissioning techniques and their impact

    International Nuclear Information System (INIS)

    Talbot, K.H.

    1983-05-01

    Modernization of equipment, changes in design codes and standards, and tightening of regulatory requirements have combined to make Pickering NGS-B in many ways different from its predecessor, Pickering 'A'. This paper briefly describes how a few selected commissioning techniques used to place Pickering 'A' into service were further developed to cope with the new requirements for Pickering 'B'. The relative performance of the commissioning programmes between the two stations is also compared

  13. Fifteen years of radioactive waste management at Ontario Hydro

    International Nuclear Information System (INIS)

    Carter, T.J.; Rao, P.K.M.

    1985-01-01

    Ontario Hydro is a large Canadian utility producing 84% (7394 MWe) of the Nuclear Electricity generated in Canada. The low- and intermediate-level radioactive wastes generated by the Ontario Hydro program are currently being managed at the Bruce Nuclear Power Development with various volume reduction, packaging and interim storage systems. Ontario Hydro also owns and operates a radioactive waste transportation system. Studies are in progress for final disposal of these wastes in a suitable geology in Ontario. Since its inception in 1971, Ontario Hydro's radioactive waste management program has evolved into providing a full fledged radioactive waste management capability to the utility's two nuclear generation centres at Pickering and Bruce, and later in the decade, to Darlington. This paper summarizes the various developments in this program; highlights the major facilities both in-service and planned to be built; reviews the experiences gained over fifteen years of in-house waste management; and discusses the proposed reorientation towards ultimate disposal of these wastes. 2 refs., 8 figs., 1 tab

  14. Safety margin improvement by adopting the feature of interleaving in 700 MWe PHWR

    International Nuclear Information System (INIS)

    Kumar, Nrependra; Yadav, S.K.; Khan, T.A.; Dixit, A.; Singhal, Mukesh; Nair, Suma R.

    2015-01-01

    Indian Pressurised Heavy Water Reactors (IPHWRs) of 700 MWe are under construction at Kakrapar Atomic Power Project -3,4 and Rajasthan Atomic Power Project-7,8. These units have enhanced safety features with respect to standard IPHWRs. One of the enhanced features is interleaving of feeders/channels. In interleaved feeder configuration, each header located at either end of reactor gets connected to one quarter of core channels, which are uniformly distributed. The core is divided into two loops with feeder connected in interleaved fashioned. In this paper a comparative study has been performed between the two cases: 1) The core splits in two vertical halves and each vertical half is a loop of PHT (TAPS-3 and 4 Type configuration). 2) The core is divided into two loops with feeders/ channels connected in interleaved fashioned (700 MWe Configuration). LOCA studies have been performed for 700 MWe PHWR considering interleaving of feeders configuration using in-house developed computer code ATMIKA and 3-D neutron kinetics code IQS-3D. The issue of interleaving is closely linked to an inherent reactivity characteristic of PHWR reactors (viz., positive void reactivity coefficient) which leads to a power increase following a Large LOCA. In 700 MWe PHWR with intent to improve the safety margin, adopted the feature of interleaving of feeders which causes in reduction in the magnitude of void coefficient and results in reduction of peak power during LBLOCA. The systematic LBLOCA study demonstrates that interleaved configuration of feeder/channels of two loops has higher safety margins (i.e. with respect to peak power, prompt-criticality margin, adiabatic heat deposition on the fuel pins, sheath temperature excursion and clad oxidation) with regard to the effectiveness of shutdown system. (author)

  15. Fission-product releases from a PHWR terminal debris bed

    Energy Technology Data Exchange (ETDEWEB)

    Brown, M.J.; Bailey, D.G., E-mail: morgan.brown@cnl.ca [Canadian Nuclear Laboratories, Chalk River, Ontario (Canada)

    2016-06-15

    During an unmitigated severe accident in a pressurized heavy water reactor (PHWR) with horizontal fuel channels, the core may disassemble and relocate to the bottom of the calandria vessel. The resulting heterogeneous in-vessel terminal debris bed (TDB) would likely be quenched by any remaining moderator, and some of the decay heat would be conducted through the calandria vessel shell to the surrounding reactor vault or shield tank water. As the moderator boiled off, the solid debris bed would transform into a more homogeneous molten corium pool located between top and bottom crusts. Until recently, the severe accident code MAAP-CANDU assumed that unreleased volatile and semi-volatile fission products remained in the TDB until after calandria vessel failure, due to low diffusivity through the top crust and the lack of gases or steam to flush released fission products from the debris. However, national and international experimental results indicate this assumption is unlikely; instead, high- and medium-volatility fission products would be released from a molten debris pool, and their volatility and transport should be taken into account in TDB modelling. The resulting change in the distribution of fission products within the reactor and containment, and the associated decay heat, can have significant effects upon the progression of the accident and fission-product releases to the environment. This article describes a postulated PHWR severe accident progression to generate a TDB and the effects of fission-product releases from the terminal debris, using the simple release model in the MAAP-CANDU severe accident code. It also provides insights from various experimental programs related to fission-product releases from core debris, and their applicability to the MAAP-CANDU TDB model. (author)

  16. The Feasibility of Multidimensional CFD Applied to Calandria System in the Moderator of CANDU-6 PHWR Using Commercial and Open-Source Codes

    Directory of Open Access Journals (Sweden)

    Hyoung Tae Kim

    2016-01-01

    Full Text Available The moderator system of CANDU, a prototype of PHWR (pressurized heavy-water reactor, has been modeled in multidimension for the computation based on CFD (computational fluid dynamics technique. Three CFD codes are tested in modeled hydrothermal systems of heavy-water reactors. Commercial codes, COMSOL Multiphysics and ANSYS-CFX with OpenFOAM, an open-source code, are introduced for the various simplified and practical problems. All the implemented computational codes are tested for a benchmark problem of STERN laboratory experiment with a precise modeling of tubes, compared with each other as well as the measured data and a porous model based on the experimental correlation of pressure drop. Also the effect of turbulence model is discussed for these low Reynolds number flows. As a result, they are shown to be successful for the analysis of three-dimensional numerical models related to the calandria system of CANDU reactors.

  17. Quick and reliable estimation of power distribution in a PHWR by ANN

    International Nuclear Information System (INIS)

    Dubey, B.P.; Jagannathan, V.; Kataria, S.K.

    1998-01-01

    Knowledge of the distribution of power in all the channels of a Pressurised Heavy Water Reactor (PHWR) as a result of a perturbation caused by one or more of the regulating devices is very important from the operation and maintenance point of view of the reactor. Theoretical design codes available for this purpose take several minutes to calculate the channel power distribution on modern PCs. Artificial Neural networks (ANNs) have been employed in predicting channel power distribution of Indian PHWRs for any given configuration of regulating devices of the reactor. ANNs produce the result much faster and with good accuracy. This paper describes the methodology of ANN, its reliability, the validation range, and scope for its possible on-line use in the actual reactor

  18. Acoustic emission experiments for PHWR technology development

    International Nuclear Information System (INIS)

    Pellionisz, P.; Jha, S.K.; Goswami, G.L.

    1992-06-01

    An Indian-Hungarian joint research project has been started with the aim of applying acoustic emission testing to solve specific problems of nuclear power plants. Acoustic emission measurement and analyzing instrumentation and software have been provided by the Hungarian side, while the measurements have been performed at the Bhabha Atomic Research Centre (BARC), India. The first task of the project was to check the capability of the method for leakage detection and shuttle movement monitoring of Pressurized Heavy Water Reactors (PHWR), and for monitoring manufacturing processes as laser welding. The preliminary measurements and results are presented. (R.P.) 15 refs.; 11 figs.; 3 tabs

  19. Slightly enriched uranium fuel for a PHWR

    International Nuclear Information System (INIS)

    Notari, C.; Marajofsky, A.

    1997-01-01

    An improved fuel element design for a PHWR using slightly enriched uranium fuel is presented. It maintains the general geometric disposition of the currently used in the argentine NPP's reactors, replacing the outer ring of rods by rods containing annular pellets. Power density reduction is achieved with modest burnup losses and the void volume in the pellets can be used to balance these two opposite effects. The results show that with this new design, the fuel can be operated at higher powers without violating thermohydraulic limits and this means an improvement in fuel management flexibility, particularly in the transition from natural uranium to slightly enriched uranium cycle. (author)

  20. Feasibility study on production of Co-60 in PHWR

    Energy Technology Data Exchange (ETDEWEB)

    Park, Kyung Bae; Han, Hyon Soo; Joo, Po Kook

    2000-05-01

    The purpose of this study is to analyze the safeties and the economics for Co-60 production from Wolsung PHWR and to verify the feasibility on the manufacturing of the final Co-60 source for industrial irradiation. The feasibility of reactor conversion was carried out with KEPCO collaboration. Through the site survey on the experience of Gentililly-2 in Canada, a feasibility of plant conversion, changes in design, equipment and tools for Co-60 production was verified. It was estimated that the reactor conversion would not impose adverse impact on plant safety. For the encapsulation of radiation source and storage of the final products, a modification of concrete hot cell at KAERI was primary concerns. The installation and improvement of facilities are needed to avoid cross contamination and extra radiation exposure. Main items for these are pressure gauge, separated HEPA filter the ceiling separation, extra-shielding and ceiling hoist system. At present, storage pool has got admission based on 400 kCi. But it is necessary to seismic analysis and design improvement of shielding to store 10 MCi (Co-60) which is the estimated Co-60 capacity produced by 3 PHWRs. According to present investigation, a production of Co-60 by PHWR and RIPE was seemed to be an economically feasible business and it was also expected that a joint venture will be able to realize by cooperation with MDS Nordion Co.

  1. Feasibility study on production of Co-60 in PHWR

    International Nuclear Information System (INIS)

    Park, Kyung Bae; Han, Hyon Soo; Joo, Po Kook

    2000-05-01

    The purpose of this study is to analyze the safeties and the economics for Co-60 production from Wolsung PHWR and to verify the feasibility on the manufacturing of the final Co-60 source for industrial irradiation. The feasibility of reactor conversion was carried out with KEPCO collaboration. Through the site survey on the experience of Gentililly-2 in Canada, a feasibility of plant conversion, changes in design, equipment and tools for Co-60 production was verified. It was estimated that the reactor conversion would not impose adverse impact on plant safety. For the encapsulation of radiation source and storage of the final products, a modification of concrete hot cell at KAERI was primary concerns. The installation and improvement of facilities are needed to avoid cross contamination and extra radiation exposure. Main items for these are pressure gauge, separated HEPA filter the ceiling separation, extra-shielding and ceiling hoist system. At present, storage pool has got admission based on 400 kCi. But it is necessary to seismic analysis and design improvement of shielding to store 10 MCi (Co-60) which is the estimated Co-60 capacity produced by 3 PHWRs. According to present investigation, a production of Co-60 by PHWR and RIPE was seemed to be an economically feasible business and it was also expected that a joint venture will be able to realize by cooperation with MDS Nordion Co

  2. Performance Shaping Factors Assessments and Application to PHWR Outages

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Seung Woo

    2007-02-15

    Human reliability analysis is definitely related to the quality of PSA because human errors have been identified as major contributors to PSA. According to NRC's 'Office of analysis and evaluation of operational data (AEOD)',82% of the reactor trips and accident during outage is caused by the events related to human errors. There is, however, no one HRA method universally accepted. Furthermore, HRA during PHWR outages has not been performed around the world yet. HRA during PHWR outages is especially important since manual management of operator is more required during PHWR. In this study, accident scenarios which HYU developed are used to perform a quantification of human error probability. In this study, overall procedures of standard HRA methodology are introduced and follows the quantification of 10 possible selected human actions during PHWR outages based on standard HRA methodology. To see the verification, quantified values were compared with the values from 'Generic CANDU Probabilistic Safety Assessment' and the values estimated by ASEP.Core Damage Frequency was estimated 3.35 x 10{sup -4} more higher than CDF estimated by AECL data. It was considered that the differences between the HEPs for OPAFW and OPECC3 make CDF higher. Therefore, complementary study of reestimating HEP for OPAFW and OPECC3 in detail is required for increasing the qualities of HRA and PSA. Moreover, one of the difficulties in performing human reliability analysis is to evaluate performance shaping factors which represent the characteristics and circumstances. For assessing a specific human action more exactly, it is necessary to consider all of the PSFs at the same time which makes an effect on the human action. Also, it requires the effect comparison among PSFs to minimize the uncertainties which are usually caused by the subjective judgements of HRA analysts. To see the sensitivity, performance shaping factors of each decision rule are changed which resulted

  3. Performance Shaping Factors Assessments and Application to PHWR Outages

    International Nuclear Information System (INIS)

    Lee, Seung Woo

    2007-02-01

    Human reliability analysis is definitely related to the quality of PSA because human errors have been identified as major contributors to PSA. According to NRC's 'Office of analysis and evaluation of operational data (AEOD)',82% of the reactor trips and accident during outage is caused by the events related to human errors. There is, however, no one HRA method universally accepted. Furthermore, HRA during PHWR outages has not been performed around the world yet. HRA during PHWR outages is especially important since manual management of operator is more required during PHWR. In this study, accident scenarios which HYU developed are used to perform a quantification of human error probability. In this study, overall procedures of standard HRA methodology are introduced and follows the quantification of 10 possible selected human actions during PHWR outages based on standard HRA methodology. To see the verification, quantified values were compared with the values from 'Generic CANDU Probabilistic Safety Assessment' and the values estimated by ASEP.Core Damage Frequency was estimated 3.35 x 10 -4 more higher than CDF estimated by AECL data. It was considered that the differences between the HEPs for OPAFW and OPECC3 make CDF higher. Therefore, complementary study of reestimating HEP for OPAFW and OPECC3 in detail is required for increasing the qualities of HRA and PSA. Moreover, one of the difficulties in performing human reliability analysis is to evaluate performance shaping factors which represent the characteristics and circumstances. For assessing a specific human action more exactly, it is necessary to consider all of the PSFs at the same time which makes an effect on the human action. Also, it requires the effect comparison among PSFs to minimize the uncertainties which are usually caused by the subjective judgements of HRA analysts. To see the sensitivity, performance shaping factors of each decision rule are changed which resulted in changes of core damage

  4. Performance of water cooled nuclear power reactor fuels in India – Defects, failures and their mitigation

    International Nuclear Information System (INIS)

    Ganguly, Chaitanyamoy

    2015-01-01

    Water cooled and moderated nuclear power reactors account for more than 95% of the operating reactors in the world today. Light water reactors (LWRs) consisting of pressurized water reactor (PWR), their Russian counterpart namely VVER and boiling water reactor (BWR) will continue to dominate the nuclear power market. Pressurized heavy water reactor (PHWR), also known as CANDU, is the backbone of the nuclear power program in India. Updates on LWR and PHWR fuel performance are being periodically published by IAEA, OECD-NEA and the World Nuclear Association (WNA), highlighting fuel failure rate and the mitigation of fuel defects and failures. These reports clearly indicate that there has been significant improvement in in – pile fuel performance over the years and the present focus is to achieve zero fuel failure in high burn up and high performance fuels. The present paper summarizes the status of PHWR and LWR fuel performance in India, highlighting the manufacturing and the related quality control and inspection steps that are being followed at the PHWR fuel fabrication plant in order to achieve zero manufacturing defect which could contribute to achieving zero in – pile failure rate in operating and upcoming PHWR units in India. (author)

  5. Waste Pickers: Why are they there?

    CSIR Research Space (South Africa)

    Oelofse, Suzanna HH

    2011-07-01

    Full Text Available of pickers ? Increase job stability and earnings of pickers ? Enhance the effectiveness of their contribution to waste management ? Entrepreneural activities as observed require a level of organisation in the informal sector ? Research are required... about 4 400 pickers operational in Johannesburg 15/07/2011 3 ? CSIR 2011 www.csir.co.za Informal sector waste pickers and entrepreneurs ? Do not pay taxes ? No trading license ? No social welfare or government insurance scheme...

  6. Corrosion control in CANDU nuclear power reactors

    International Nuclear Information System (INIS)

    Lesurf, J.E.

    1974-01-01

    Corrosion control in CANDU reactors which use pressurized heavy water (PHW) and boiling light water (BLW) coolants is discussed. Discussions are included on pressure tubes, primary water chemistry, fuel sheath oxidation and hydriding, and crud transport. It is noted that corrosion has not been a significant problem in CANDU nuclear power reactors which is a tribute to design, material selection, and chemistry control. This is particularly notable at the Pickering Nuclear Generating Station which will have four CANDU-PHW reactors of 540 MWe each. The net capacity factor for Pickering-I from first full power (May 1971) to March 1972 was 79.5 percent, and for Pickering II (first full power November 1971) to March 1972 was 83.5 percent. Pickering III has just reached full power operation (May 1972) and Pickering IV is still under construction. Gentilly CANDU-BLW reached full power operation in May 1972 after extensive commissioning tests at lower power levels with no major corrosion or chemistry problems appearing. Experience and operating data confirm that the value of careful attention to all aspects of corrosion control and augur well for future CANDU reactors. (U.S.)

  7. Remote tooling for inspection and repair in Pickering NGS-A calandria vault

    International Nuclear Information System (INIS)

    Hadji-Mirzai, M.; Tokarz, A.; Vandenberg, J.P.

    1993-01-01

    In recent years it has been necessary to develop capabilities for the inspection and repair of carbon steel components located within calandria vaults at Ontario Hydro's Pickering Nuclear Generating Station 'A'. Concerns about corrosion of piping and some of the structural components have made necessary the development of remote manipulators to inspect and repair carbon steel components within the vaults to ensure continued reliable operation of the units. Remote manipulators for this program have been designed to perform a number of inspection and repair tasks, and several versions have been developed to specialise in detailed inspection techniques and precision tooling module manipulation. (author)

  8. Production of gadolinium nitrate for TAPS 3 and 4 PHWR

    International Nuclear Information System (INIS)

    Mishra, S.L.; Ramakrishnan, P.; Iyer, N.S.; Singh, Harvinderpal

    2004-01-01

    In India, gadolinium nitrate is being used for the first time in PHWR at Tarapur. Gadolinium is preferred over boron due to high neutron cross section and the water soluble nitrate form works efficiently for reactivity control through moderator liquid poison addition system (MLPS) as well as for reactor shut down system (SDS2). Low concentration of gadolinium (0.1-0.2 g/l) in heavy water is sufficient to shut down the reactor in a very short time. After use, the small amount of gadolinium can be separated quickly from heavy water by ion exchange process. In this paper separation of Gd using of 2-ethyl hexyl phosphoric acid mono 2-ethyl hexyl ester EHEHPA as an extractant has been described

  9. The cracking of pressure tubes in the Pickering reactor

    International Nuclear Information System (INIS)

    Ross-Ross, P.A.

    1978-01-01

    Small cracks in 17 of the 390 pressure tubes in Unit 3 of the 2056 MW (electrical) Pickering Generating Station and of 52 tubes in Unit 4, resulted in each of these units being out of service for many months. The cracks originated at areas of extremely high residual tensile stress produced by improper positioning of the rolling tool used during construction to join the pressure tube to its end-fitting. The mechanism of failure was delayed hydrogen cracking. (author)

  10. Development of upgraded full-core 3D diffusion models for the Pickering stations

    Energy Technology Data Exchange (ETDEWEB)

    Arsenault, B., E-mail: benoit.arsenault@amecfw.com [AMEC Foster Wheeler, Toronto, ON (Canada); Catovic, Z., E-mail: zlatko.catovic@opg.com [Ontario Power Generation, Pickering, ON (Canada); Shaula, S., E-mail: sergiy.shaula@amecfw.com [AMEC Foster Wheeler, Toronto, ON (Canada); Buchan, P.D., E-mail: david.buchan@opg.com [Ontario Power Generation, Pickering, ON (Canada)

    2015-07-01

    This paper describes a methodology used to model Pickering reactors with the Reactor Physics toolset currently in use at OPG stations, which includes the Reactor Physics Industry Standard Toolset (RFSP-IST/WIMS-IST/DRAGON-IST) and the fuel management code SORO. Detailed geometries were modeled in DRAGON-IST with devices and structures that extended into the reflector region and incremental properties were calculated for reactivity devices, guide tubes and structural materials based on the engineering drawings. Simulations and comparisons with measurements performed showed improved predictive capabilities of the new reactor physics models. (author)

  11. Development of upgraded full-core 3D diffusion models for the Pickering stations

    International Nuclear Information System (INIS)

    Arsenault, B.; Catovic, Z.; Shaula, S.; Buchan, P.D.

    2015-01-01

    This paper describes a methodology used to model Pickering reactors with the Reactor Physics toolset currently in use at OPG stations, which includes the Reactor Physics Industry Standard Toolset (RFSP-IST/WIMS-IST/DRAGON-IST) and the fuel management code SORO. Detailed geometries were modeled in DRAGON-IST with devices and structures that extended into the reflector region and incremental properties were calculated for reactivity devices, guide tubes and structural materials based on the engineering drawings. Simulations and comparisons with measurements performed showed improved predictive capabilities of the new reactor physics models. (author)

  12. Calculation of homogenized Pickering NGS stainless steel adjuster rod neutron cross-sections using conservation of reaction rates

    Energy Technology Data Exchange (ETDEWEB)

    Robinson, R C [Atlantic Nuclear Services Ltd. (Canada); Tran, F [Ontario Hydro, Pickering, ON (Canada). Pickering Generating Station

    1996-12-31

    A homogenization methodology for calculation of reactivity device incremental cross-sections has been developed using reaction rate conservation (RRC). A heterogeneous transport calculation of flux was utilised to produce the homogenized cross-sections for a finite difference two group diffusion code. The RRC cross-sections have been shown to improve significantly the prediction of reactivity worth for stainless steel adjuster rods installed in Pickering NGS reactors. (author). 10 refs., 3 tabs., 6 figs.

  13. Recent IAEA activities on CANDU-PHWR fuels and fuel cycles

    International Nuclear Information System (INIS)

    Inozemtsev, V.; Ganguly, C.

    2005-01-01

    Pressurized Heavy Water Reactors (PHWR), widely known as CANDU, are in operation in Argentina, Canada, China, India, Pakistan, Republic of Korea and Romania and account for about 6% of the world's nuclear electricity production. The CANDU reactor and its fuel have several unique features, like horizontal calandria and coolant tubes, on-power fuel loading, thin-walled collapsible clad coated with graphite on the inner surface, very high density (>96%TD) natural uranium oxide fuel and amenability to slightly enriched uranium oxide, mixed uranium plutonium oxide (MOX), mixed thorium plutonium oxide, mixed thorium uranium (U-233) oxide and inert matrix fuels. Several Technical Working Groups (TWG) of IAEA periodically discuss and review CANDU reactors, its fuel and fuel cycle options. These include TWGs on water-cooled nuclear power reactor Fuel Performance and Technology (TWGFPT), on Nuclear Fuel Cycle Options and spent fuel management (TWGNFCO) and on Heavy Water Reactors (TWGHWR). In addition, IAEA-INPRO project also covers Advanced CANDU Reactors (ACR) and DUPIC fuel cycles. The present paper summarises the Agency's activities in CANDU fuel and fuel cycle, highlighting the progress during the last two years. In the past we saw HWR and LWR technologies and fuel cycles separate, but nowadays their interaction is obviously growing, and their mutual influence may have a synergetic character if we look at the world nuclear fuel cycle as at an integrated system where the both are important elements in line with fast neutron, gas cooled and other advanced reactors. As an international organization the IAEA considers this challenge and makes concrete steps to tackle it for the benefit of all Member States. (author)

  14. Blind prediction exercise on modeling of PHWR fuel at extended burnup

    International Nuclear Information System (INIS)

    Sah, D.N.; Viswanathan, U.K.; Viswanadham, C.S.; Unnikrishnan, K.; Rath, B.N.

    2008-01-01

    A blind prediction exercise was organised on Indian Pressurised Heavy Water Reactor (PHWR) fuel to investigate the predictive capability of existing codes for their application at extended burnup and to identify areas of improvement. The blind problem for this exercise was based on a PHWR fuel bundle irradiated in Kakrapar Atomic Power Station-I (KAPS-I) up to about 15 000 MWd/tU and subjected to detailed post-irradiation examination (PIE) in the hot cells facility at BARC. Eleven computer codes from seven countries participated in this exercise. The participants provided blind predictions of fuel temperature, fission gas release, internal gas pressure and other performance parameters for the fuel pins. The predictions were compared with the experimental PIE data which included fuel temperature derived from fuel restructuring, fission gas release measured by fuel pin puncturing, internal gas pressure in pin, cladding oxidation and fuel microstructural data. The details of the blind problem and an analysis of the results of blind predictions by the codes vis-a-vis measured data are provided in this paper

  15. Process improvements for enhanced productivity of PHWR garter springs

    International Nuclear Information System (INIS)

    Srinivasula Reddy, S.; Tonpe, Sunil; Saibaba, N.; Jayaraj, R.N.

    2009-01-01

    Full text: In Pressurised Heavy Water Reactors (PHWR), Garter springs are used as spacers between the coolant tube and calandria tube. Garter springs are made from Zirconium alloy containing 2.5 % Niobium and 0.5% copper. The springs are basically manufactured by coiling a wire of cross section 1.7 mm x 1.0 mm, which is produced by series of drawing and swaging operations using hot extruded rods of 19 mm diameter. The manufacturing process also involves heat treatment and chemical cleaning operations at appropriate stages. It is required to ensure that the life of springs against parameters like hydrogen pickup, residual stresses and low stiffness is improved at the manufacturing stage itself by improving manufacturing process. The impact of above problems on spring life and process improvements is briefly discussed. The critical factor affecting the garter spring performance in PHWR Reactor is mainly hydrogen. The life limiting factors for garter springs are the problems arising out of high total hydrogen content, which depends on the hydrogen pickup during reactor operation. This phenomenon can happen during the reactor operation, as springs are prone to pick-up hydrogen in the reactor environment. Hence acceptable hydrogen content for the springs is specified as 25 ppm (max.). Garter spring is susceptible to hydrogen pick-up during various production processes, which make material brittle and difficult for fabrication process such as wire drawing and coiling. By studying and optimizing the process parameters of spring manufacturing, the hydrogen pick-up of springs is brought down from 70 ppm to a level of 20 ppm. Garter springs are provided with a hook at each end to enable its assembly to coolant tube in the reactor. The hook portion is very critical in maintaining the integrity of the spring. It is desirable to have the hook portion relieved of all residual stresses. For this purpose manufacturing process has been modified and solutionising was introduced as

  16. Characteristics of pressure control system on PWR/PHWR in pile loop facility

    International Nuclear Information System (INIS)

    Sarwani; Hendro, P.; Suwoto; Sutrisno

    1998-01-01

    PWR/PHWR in-pile loop facility is used for testing of fuel element bundle which is correspond to the condition of power reactor operation. So, this facility is designed at 150 bar of pressure and 350 o C of temperature. Pressure control system is one of the components of the facility and it is equipped with 6 electrical heaters (30 KW), water spray, pressure and temperature monitors. The characterization test of pressure control system has been carried out with operating of 2 electrical heaters (10 KW). The K eff calculation value is different 5.2% from pressure in the pressure control system can be increased to 160 bar within 27 hours. After the system pressure reached the nominal pressure, the pressure control system was in the steady state condition

  17. Role of pressuriser in enhancing pressure control system capability in primary system of 500 MWe PHWR

    Energy Technology Data Exchange (ETDEWEB)

    Walia, M P.S.; Misri, Vijay; Bapat, C N; Sharma, V K [Nuclear Power Corporation, Bhabha Atomic Research Centre, Mumbai (India)

    1994-06-01

    The primary heat transport system of a pressurized heavy water reactor (PHWR) extracts and transports the heat produced in the fuel (located inside coolant channel assemblies) to the steam generators where steam is generated to run the turbo-generator. The heat transport medium (primary coolant) is heavy water which is kept in a pressurized liquid state with the help of a pressure control system. Feed and bleed circuits with associated equipment of PHT main system have traditionally constituted the pressure control system. However, for large size reactors of 500 MWe capacity, a surge tank known as pressurizer was incorporated due to the presence of relatively large inventory in PHT main circuit. The pressurizer acts as a cushion for pressure variations resulting from various transients. This significantly reduces the onerous demand on feed and bleed system, thereby reducing reactor outages on system pressure excursions. The paper describes in detail the pressure control system of 500 MWe PHWR involving pressuriser and feed and bleed system including their functions and instrumentation. The results of mathematical modelling/analysis undertaken to establish the response adequacy of pressure control system, to postulated plant transients vis-a-vis the role of pressurizer are presented. (author). 10 figs.

  18. Pickering nuclear fish diversion net

    Energy Technology Data Exchange (ETDEWEB)

    Xiao, J.; Lew, A. [Ontario Power Generation, Toronto, Ontario (Canada)

    2013-07-01

    Pickering Fish Diversion Net - An Engineered Environmental Solution that has significantly reduced fish impingement at the Pickering Nuclear Facility. Note: As a recent urgent request/discussed by Mark Elliot, CNE-OPG and Jacques Plourde, CNS.

  19. Self reliance in equipment building for PHWR fuel fabrication

    International Nuclear Information System (INIS)

    Sastry, V.S.; Hemantha Rao, G.V.S.; Jayaraj, R.N.

    2009-01-01

    Full text: Keeping in tune with the policy of self-reliance and indigenisation adopted from the very inception of nuclear power programme in India during the mid 1960, Nuclear Fuel Complex, established in the year 1971, developed its own processes, equipment and technologies based on both in-house experience and the expertise available in the indigenous industry. Starting from the basic raw materials, Nuclear Fuel Complex (NFC) manufactures and supplies finished fuel assemblies, apart from zircaloy core components, to all the nuclear power stations in India. Out of several products manufactured by NFC, 19 and 37 element fuel bundles for Pressurised Heavy Water Reactors (PHWRs) is vital for operation of several PHWRs being operated by Nuclear Power Corporation of India Limited (NPCIL). Starting from the manufacturing of half-charge for RAPS-1, more than 3.8 lakh fuel bundles were made till now. Several process improvements were taken up over the years for improving the quality of the fuel. PHWR fuel bundles manufactured by NFC has adopted an unique feature of joining appendages on zirconium alloy tubes by resistance welding before loading natural uranium dioxide pellets. Graphite coating on the inner surface of the zirconium alloy tube and vacuum baking, use of profiled end caps, use of bio-degradable cleaning agents are some of the processes adopted in the manufacturing of PHWR fuel bundles. With the recent opening up of international nuclear trade for India and the enhanced growth of nuclear power, exciting opportunities and challenges confront NFC. This paper presents salient features of some important special purpose equipment developed in-house at NFC for production of PHWR fuel bundles. It looks ahead to develop many more such special purpose equipment towards meeting the diverse demands now showing up to meet the indigenous as well as international requirements

  20. Emerging trends in PHWR safety - post Fukushima measures

    International Nuclear Information System (INIS)

    Nitheanandan, T.

    2015-01-01

    Nuclear power continues to be the choice for many countries that are seeking to enhance their energy security and reduce their carbon emissions. Nuclear power plants are complex systems which require multiple layers of protection. The fundamental principle of nuclear power safety technology is ‘Defence-in-Depth’ that underlies all safety activities - organizational, behavioural and technical. This provides layers of overlapping barrier protections so that, in the unlikely event that failure occurs, it would be compensated or corrected without causing harm to individuals or the public at large. Defence-in-depth encompasses prevention, control, protection, severe accident management and consequence mitigation, and offsite emergency response measures. Reactor Safety Science and Technology (S and T) has evolved over more than four decades in a number of PHWR countries. The PHWR operators, regulators and national research laboratories have dedicated S and T programs to continuously improve plant safety, operations and margins. The S and T is focused on finding simpler, less costly and more reliable safety system designs. These improvements are continuously incorporated in current units, refurbished units and proposed new builds. The Fukushima accident forced most nuclear nations to reassess and implement reactor design upgrades. The lessons learned from Fukushima have generated some nuclear safety enhancements such as: Design considerations for natural hazards, Diversity of heat sinks, Consideration of extended duration station blackout, Improvements to Severe Accident Management and SAM Operational aids, Accident instrumentation, Offsite management such as the use of predictive exposure tools, and Design considerations for Spent Fuel Pools. The plenary presentation will provide some of the emerging trends following the Fukushima accident. Examples of these emerging trends in Canada and on the international scene, will be presented. (author)

  1. The heavy water reactors

    International Nuclear Information System (INIS)

    Brudermueller, G.

    1976-01-01

    This is a survey of the development so far of this reactor line which is in operation all over the world in various types (e.g. BHWR, PHWR). MZFR and the CANDU-type reactors are discussed in more detail. (UA) [de

  2. Investigations on the inadvertent power increase in a PHWR as ASSET experience

    Energy Technology Data Exchange (ETDEWEB)

    Kumar, S H [Operating Plants Safety Div., Atomic Energy Regulatory Board, Mumbai (India)

    1997-12-31

    Investigations were carried out using the ASSET methodology to find out the root cause of an incident involving inadvertent increase in reactor power in the Unit 1 of Narora Atomic Power Station (NAPS) in India. NAPS is a twin Unit, 220 MWe PHWR based power station. On December 4, 1992, when NPAS Unit 1 was operating at 130 MWe, the reactor power increased steadily on its own and touched 147 MWe, over a period of 14 minutes. The set (demand) power of the triplicated reactor regulating system had increased on its own and in turn has made the reactor to operated at higher power. The power was brought down to 120 MWe by manual intervention. Since adequate system related data during the incident was not available, laboratory studies were carried out using computer simulations for the various process disturbances which could affect the reactor regulating system, for establishing the causes of the event. 4 figs.

  3. Investigations on the inadvertent power increase in a PHWR as ASSET experience

    International Nuclear Information System (INIS)

    Kumar, S.H.

    1996-01-01

    Investigations were carried out using the ASSET methodology to find out the root cause of an incident involving inadvertent increase in reactor power in the Unit 1 of Narora Atomic Power Station (NAPS) in India. NAPS is a twin Unit, 220 MWe PHWR based power station. On December 4, 1992, when NPAS Unit 1 was operating at 130 MWe, the reactor power increased steadily on its own and touched 147 MWe, over a period of 14 minutes. The set (demand) power of the triplicated reactor regulating system had increased on its own and in turn has made the reactor to operated at higher power. The power was brought down to 120 MWe by manual intervention. Since adequate system related data during the incident was not available, laboratory studies were carried out using computer simulations for the various process disturbances which could affect the reactor regulating system, for establishing the causes of the event. 4 figs

  4. Computation and measurement of calandria tube sag in PHWR

    International Nuclear Information System (INIS)

    Kim, Tae Ryong; Sohn, Seok Man

    2003-01-01

    Calandria tubes and liquid injection shutdown system (LISS) tubes in a pressurized heavy water reactor (PHWR) is known to sag due to irradiation creep and growth during plant operation. When the sag of calandria tube becomes bigger, the calandria tube possibly comes in contact with LISS tube crossing beneath and calandria tube. The contact subsequently may cause the damage on the calandria tube resulting in unpredicted outage of the plant. It is therefore necessary to check the gap between the two tubes in order to periodically confirm no contact by using a proper measure during the plant life. An ultrasonic gap measuring probe assembly which can be inserted into two viewing ports of the calandria was developed in Korea and utilized to measure the sags of both tubes in the PHWR. It was found that the centerlines of calandria tubes and liquid injection shutdown system tubes can be precisely detected by ultrasonic wave. The gaps between two tubes were easily obtained from the relative distance of the measured centerline elevations of the tubes. Based on the irradiation creep equation and the measurement data, a computer program to calculate the sags was also developed. With the computer program, the sag at the end of plant life was predicted. (author)

  5. Field testing of behavioral barriers for cooling water intake structures -test site 1 - Pickering Nuclear Generating Station

    International Nuclear Information System (INIS)

    Patrick, P.H.; McKinley, R.S.; Micheletti, W.C.

    1988-01-01

    A multi-year research program was developed by the Electric Power Research Institute to evaluate the effectiveness of selected behavioral systems for fish exclusion at sites representative of different aquatic environments. The first test site was the Pickering Nuclear Generating Station (NGS) located on Lake Ontario which represented the Great Lakes environment. A single pneumatic popper, a low frequency, high amplitude sound deterrent, was found to effectively exclude adult alewife, the principal species impinged at Pickering NGS. An air bubble curtain, used either alone or combined with strobe lights, was not a consistent deterrent. Effectiveness of air bubbles was only enhanced when used in association with a popper. Strobe lights were the least effective of the three devices tested. Operation of all three devices together did not surpass the effectiveness of the popper when used alone. Sound deterrents show promise for fish exclusion at generating stations located on the Great Lakes

  6. Experience in operation of heavy water reactors

    International Nuclear Information System (INIS)

    Rotaru, Ion; Bilegan, Iosif; Ghitescu, Petre

    1999-01-01

    The paper presents the main topics of the CANDU owners group (COG) meeting held in Mangalia, Romania on 7-10 September 1998. These meetings are part of the IAEA program for exchange of information related mainly to CANDU reactor operation safety. The first meeting for PHWR reactors took place in Vienna in 1989, followed by those in Argentina (1991), India (1994) and Korea (1996). The topics discussed at the meeting in Romania were: operation experience and recent major events, performances of CANDU reactors and safe operation, nuclear safety and operation procedures of PHWR, programs and strategies of lifetime management of installations and components of NPPs, developments and updates

  7. The 1994 loss of coolant incident at Pickering NGS

    Energy Technology Data Exchange (ETDEWEB)

    Charlebois, P R; Clarke, T R; Goodman, R M; McEwan, W F [Ontario Hydro, Pickering, ON (Canada). Pickering Generating Station; Cuttler, J M [Atomic Energy of Canada Ltd., Mississauga, ON (Canada)

    1996-12-31

    Fracture of the rubber diaphragm in a liquid relief valve initiated events leading to a loss of coolant in Unit 2, on December 10. The valve failed open, filling the bleed condenser. The reactor shut itself down. When pressure recovered, two spring-loaded safety relief valves opened and one of them chattered. The shock and pulsations cracked the inlet pipe to the chattering valve, and the subsequent loss of coolant triggered the emergency core cooling system. The incident was terminated by operator action. No abnormal radioactivity was released. The four reactor units of Pickering A remained shut down until the corrective actions were completed in April/May 1995. (author). 4 figs.

  8. Heat wave generates questions about Ontario's generation capacity

    International Nuclear Information System (INIS)

    Horne, D.

    2005-01-01

    Concerns regarding Ontario's power generation capacity were raised following a major blackout which occurred in August 2003. Power demand reached 26,170 MW during the weeks leading to the blackout, forcing the Independent Electricity System Operator (IESO) to ask residents to reduce electricity use during the day. The grid operator had also issued a forecast that Toronto could face rolling blackouts during times of heavy power demand. Ontario power consumption records were set in June and July of 2003 due to a heat wave, with hourly demand exceeding 25,000 MW on 53 occasions. Ontario was forced to import up to 3,400 MW (13 per cent of its power needs) from neighbouring provinces and the United States. During that period, the price of power had risen sharply to over 30 cents a kilowatt hour, although household consumers were still charged in the 5 to 10 cent range per kilowatt hour. However, it was noted that taxpayers will eventually bear the cost of importing power. The IESO noted that importing electricity is cheaper than the generation available in Ontario and that it is more economical to import, based on the market clearing price of all generators. In 2004, the IESO purchased 6 per cent of their electricity from the United States. That figure is expected to increase for 2005. Ontario generators produced 26.9 million MWh more in the summer of 2005 than during the same period in 2004 to meet electricity demand levels. It was noted that although importing power presently meets peak demand, the IESO agrees there is a need for new generation within Ontario. In addition to restarting Ontario's Pickering and Bruce nuclear facilities, more than 3,300 MW of new gas-fired generation is under construction or approved, and more than 9,000 MW are in various stages of approval. This paper discussed the effect of high energy costs on industry and Ontario's ability to meet future electricity demand in comparison to neighbouring jurisdictions. Issues regarding grid maintenance

  9. Development of 3-dimensional neutronics kinetics analysis code for CANDU-PHWR

    International Nuclear Information System (INIS)

    Kim, M. W.; Kim, C. H.; Hong, I. S.

    2005-02-01

    The followings are the major contents and scope of the research : development of kinetics power calculation module, formulation of space-dependent neutron transient analysis - implementation of 3-D and 2-G unified nodal method, verification of the kinetics module by benchmark problem - 3-D PHWR kinetics benchmark problem suggested by AECL, reactor trip simulation by shutdown system 1 in Wolsong unit 2. Development of a dynamic linked library code, SCAN D LL, for the coupled calculation with RELAP-CANDU : modeling of shutdown system 1, development of automatic shutdown module - automatic trip module based on rate log power control logic, automatic insertion of shutdown system 1. Development of a link code for coupled calculation - development of SCAN D LL(windows version), verification of coupled code by - 40% reactor inlet header break LOCA power pulse, 100% reactor outlet header break LOCA power pulse, 50% pump suction break LOCA power pulse

  10. Pickering unit 1 containment leakage characterization

    International Nuclear Information System (INIS)

    Zakaib, G.D.

    1994-01-01

    Results of the design pressure test carried out on Pickering Reactor Building number 1 during late 1992 showed that the leakage rate of the building was close to the safety analysis value of 2.7% contained mass per hour at the design pressure of 41.4 kPa(g) and was significantly higher than that reported after the previous test conducted in the spring of 1987. This unexpected finding initiated the longest and the most comprehensive containment leakage investigation ever undertaken by Ontario Hydro. A thorough investigation of leakage behaviour by repeated testing, inspections, leak search and analysis was launched. The extensive leak search effort included items such as: leak source detection by soap solution application, use of ultrasonic detectors, fogging and tracer gas techniques, systematic systems isolation, thermal imaging of the exterior, and quantification of leak sites by flowmeter and bagging. Using a specially designed volumetric technique, the root cause of the problem was finally confirmed as being due to 'pressure dependent laminar leakage' through the hairline cracks in the dome concrete. Structural analysis indicated that the thermal gradients and pressure loading combined to cause the cracking early in the structure's operating history and that overall structural integrity has not been compromised. Leakage rate analysis using a new fluid mechanics model augmented by the effect of thermal strains indicated that the leakage could be significantly less under certain transient temperature gradient conditions. Several options for repairing the dome were considered by a multidisciplinary team and it was finally decided to apply a specially engineered multilayer elastomeric coating to the exterior concrete surface. When the unit was re-tested in October 1993, a dramatic ten-fold improvement in leakage rate (down to 0.25%/h at design pressure) was observed. This is lower than even the commissioning results and comparable to the performance of newer units

  11. The AECL reactor development programme

    International Nuclear Information System (INIS)

    Menelely, D.A.

    1997-01-01

    The modem CANDU-PHWR power reactor is the result of more than 50 years of evolutionary design development in Canada. It is one of only three commercially successful designs in the world to this date. The basis for future development is the CANDU 6 and CANDU 9 models. Four of the first type are operating and four more will go an line before the end of this decade. The CANDU 9 is a modernized single-unit version of the twelve large multi-unit plants operated by Ontario Hydro. All of these plants use proven technology which resulted from research, development, design construction, and operating experience over the past 25 years. Looking forward another 25 years, AECL plans to retain all of the essential features that distinguish today's CANDU reactors (heavy water moderation, on-power fuelling simple bundle design, horizontal fuel channels, etc.). The end product of the planned 25-year development program is more than a specific design - it is a concept which embodies advanced features expected from ongoing R and D programs. To carry out the evolutionary work we have selected seven main areas for development: Safety Technology, Fuel and Fuel Cycles, Fuel Channels, Systems and Components, Heavy Water and Tritium Information Technology, and Construction. There are three strategic measures of success for each of these work areas: improved economics, advanced fuel cycle utilization, and enhanced safety/plant robustness. The paper describes these work programs and the overall goals of each of them. (author)

  12. A progress review of Ontario Hydro's nuclear generation and heavy water production programs

    International Nuclear Information System (INIS)

    Kee, F.J.; Woodhead, L.W.

    Performance and economics of CANDU reactors in service are described. Progress of commissioning, construction and planning of reactors at Pickering, Bruce, and Darlington is outlined. Heavy water production is reviewed. (E.C.B.)

  13. Cobalt-60 production in CANDU power reactors

    International Nuclear Information System (INIS)

    Malkoske, G.R.; Norton, J.L.; Slack, J.

    2002-01-01

    MDS Nordion has been supplying cobalt-60 sources to industry for industrial and medical purposes since 1946. These cobalt-60 sources are used in many market and product segments, but are primarily used to sterilize single-use medical products including; surgical kits, gloves, gowns, drapes, and cotton swabs. Other applications include sanitization of cosmetics, microbial reduction of pharmaceutical raw materials, and food irradiation. The technology for producing the cobalt-60 isotope was developed by MDS Nordion and Atomic Energy of Canada Limited (AECL) almost 55 years ago using research reactors at the AECL Chalk River Laboratories in Ontario, Canada. The first cobalt-60 source produced for medical applications was manufactured by MDS Nordion and used in cancer therapy. The benefits of cobalt-60 as applied to medical product manufacturing, were quickly realized and the demand for this radioisotope quickly grew. The same technology for producing cobalt-60 in research reactors was then designed and packaged such that it could be conveniently transferred to a utility/power reactor. In the early 1970's, in co-operation with Ontario Power Generation (formerly Ontario Hydro), bulk cobalt-60 production for industrial irradiation applications was initiated in the four Pickering A CANDU reactors. As the demand and acceptance of sterilization of medical products grew, MDS Nordion expanded its bulk supply by installing the proprietary Canadian technology for producing cobalt-60 in additional CANDU reactors. CANDU is unique among the power reactors of the world, being heavy water moderated and fuelled with natural uranium. They are also designed and supplied with stainless steel adjusters, the primary function of which is to shape the neutron flux to optimize reactor power and fuel bum-up, and to provide excess reactivity needed to overcome xenon-135 poisoning following a reduction of power. The reactor is designed to develop full power output with all of the adjuster

  14. Comparative analysis of station blackout accident progression in typical PWR, BWR, and PHWR

    International Nuclear Information System (INIS)

    Park, Soo Young; Ahn, Kwang Il

    2012-01-01

    Since the crisis at the Fukushima plants, severe accident progression during a station blackout accident in nuclear power plants is recognized as a very important area for accident management and emergency planning. The purpose of this study is to investigate the comparative characteristics of anticipated severe accident progression among the three typical types of nuclear reactors. A station blackout scenario, where all off-site power is lost and the diesel generators fail, is simulated as an initiating event of a severe accident sequence. In this study a comparative analysis was performed for typical pressurized water reactor (PWR), boiling water reactor (BWR), and pressurized heavy water reactor (PHWR). The study includes the summarization of design differences that would impact severe accident progressions, thermal hydraulic/severe accident phenomenological analysis during a station blackout initiated-severe accident; and an investigation of the core damage process, both within the reactor vessel before it fails and in the containment afterwards, and the resultant impact on the containment.

  15. Design of reactor components (non replaceable) of 500 MWe PHWR for enhanced life

    International Nuclear Information System (INIS)

    Dwivedi, K.P.; Seth, V.K.

    1994-01-01

    A nuclear power station is characterised by large initial cost and low operating cost. So a plant which is capable of operating for a longer period of time will be economically more attractive. In the past approach had been to design a nuclear power plant for 30 to 40 years of life time. However, with the improvement in technology and incorporation of redundant and diverse safety features it is now possible to design a nuclear power plant for longer life. Now internationally it is being realised that without sacrificing safety features, plant life should be extended till the cost of maintenance or refurbishment is larger than the cost of the replacement capacity. In order to meet the objective of long life, for the components which cannot be easily replaced the life time of about 100 years is being considered as the design objective. For other items replacement, layout space, shielding, access route and lifting capacity and component design are receiving additional emphasis so as to provide a long total station life time. With the above background, design improvements to enhance the life of reactor components for 500 MWe PHWR namely calandria, end shields and calandria vault liners which cannot be replaced and on which any repair is extremely difficult, have been made. This paper deals with design life of these components and the modifications incorporated in the design. (author). 3 refs., 2 tabs., 3 figs

  16. Tuning Amphiphilicity of Particles for Controllable Pickering Emulsion

    Directory of Open Access Journals (Sweden)

    Zhen Wang

    2016-11-01

    Full Text Available Pickering emulsions with the use of particles as emulsifiers have been extensively used in scientific research and industrial production due to their edge in biocompatibility and stability compared with traditional emulsions. The control over Pickering emulsion stability and type plays a significant role in these applications. Among the present methods to build controllable Pickering emulsions, tuning the amphiphilicity of particles is comparatively effective and has attracted enormous attention. In this review, we highlight some recent advances in tuning the amphiphilicity of particles for controlling the stability and type of Pickering emulsions. The amphiphilicity of three types of particles including rigid particles, soft particles, and Janus particles are tailored by means of different mechanisms and discussed here in detail. The stabilization-destabilization interconversion and phase inversion of Pickering emulsions have been successfully achieved by changing the surface properties of these particles. This article provides a comprehensive review of controllable Pickering emulsions, which is expected to stimulate inspiration for designing and preparing novel Pickering emulsions, and ultimately directing the preparation of functional materials.

  17. Investigation of tritium in groundwater at Pickering NGS

    International Nuclear Information System (INIS)

    DeWilde, J.; Yu, L.; Belanger, D.; Wootton, R.; Hansen, K.; McGurk, E.; Teare, A.

    2001-01-01

    Ontario Power Generation Inc. (OPG) investigated tritium in groundwater at the Pickering Nuclear Generating Station (PNGS). The objectives of the study were to evaluate and define the extent of radio-nuclides, primarily tritium, in groundwater, investigate the causes or sources of contamination, determine impacts on the natural environment, and provide recommendations to prevent future discharges. This paper provides an overview of the investigations conducted in 1999 and 2000 to identify the extent of the tritium beneath the site and the potential sources of tritium released to the groundwater. The investigation and findings are summarized with a focus on unique aspects of the investigation, on lessons learned and benefits. Some of the investigative techniques discussed include process assessments, video inspections, hydrostatic and tracer tests, Helium 3 analysis for tritium age dating, deuterium and tritium in soil analysis. The investigative techniques have widespread applications to other nuclear generating stations. (author)

  18. Safety in nuclear power systems

    International Nuclear Information System (INIS)

    Myers, L.C.

    1987-05-01

    This paper discusses the issue of safety in complex energy systems and provides brief accounts of some of the most serious reactor accidents that have occurred to date. Details are also provided of Ontario Hydro's problems with Unit 2 at Pickering

  19. Pickering NGS end of commercial operations

    Energy Technology Data Exchange (ETDEWEB)

    Swami, L. [Ontario Power Generation, Pickering, ON (Canada)

    2015-07-01

    Pickering continues as a valued asset for the Province • OPG's current business plan is to continue to operate Pickering to the end of 2020 • Planning its shutdown is underway and includes the following activities to: • Place the units into safe store • Manage the wastes arising • Repurpose the Pickering lands and facilities • Decommissioning will take place in the future and will include appropriate waste management activities. © Copyright 2015 by the Canadian Nuclear Society. All rights reserved.

  20. Expanding exports, increasing smog : Ontario Power Generation's and Hydro One's strategies to continue coal-fired electricity generation in Ontario

    International Nuclear Information System (INIS)

    Gibbons, J.

    2002-06-01

    The production of coal-fired electricity increased by approximately 150 per cent in Ontario between 1995 and 2000. As a result, the smog-causing emissions generated by the five coal-fired power plants operated by Ontario Power Generation caused an increase in smog and worsened air quality in the province as well as affecting air quality as far afield as the Atlantic provinces. Between 2002 and 2005, it is expected that the Pickering and Bruce nuclear plants will be returned to service, making the electricity generated by the coal plants surplus to Ontario's needs. Increasing this surplus are the planned natural gas generating stations. Ontario Power Generation is planning on using this surplus to export it to the United States rather than phasing out its reliance on coal. The increase in exports to the United States Northeast and Midwest is planned with Hydro One, already busy increasing its transmission capacity to the United States by 1,000 megawatt (MW). This plan involves laying 975 MW submarine cable from the Nanticoke Generating Station (operated by Ontario Power Generation) under Lake Erie to Pennsylvania, Ohio, or both states. At the moment, the exports are constrained by the government emissions limits imposed by the Ontario government on sulphur dioxide and nitrogen oxides. This constraint could be removed if Ontario Power Generation decides to pay further for pollution controls for sulphur dioxide and nitrogen oxides at its coal stations. Unfortunately, increasing the exports would also result in emissions increases for 28 other uncapped pollutants such as lead, mercury and arsenic. The author recommended that the Ontario government ban non-emergency coal-fired electricity exports to improve air quality in the province. refs., 8 figs

  1. Benchmark of Atucha-2 PHWR RELAP5-3D control rod model by Monte Carlo MCNP5 core calculation

    Energy Technology Data Exchange (ETDEWEB)

    Pecchia, M.; D' Auria, F. [San Piero A Grado Nuclear Research Group GRNSPG, Univ. of Pisa, via Diotisalvi, 2, 56122 - Pisa (Italy); Mazzantini, O. [Nucleo-electrica Argentina Societad Anonima NA-SA, Buenos Aires (Argentina)

    2012-07-01

    Atucha-2 is a Siemens-designed PHWR reactor under construction in the Republic of Argentina. Its geometrical complexity and peculiarities require the adoption of advanced Monte Carlo codes for performing realistic neutronic simulations. Therefore core models of Atucha-2 PHWR were developed using MCNP5. In this work a methodology was set up to collect the flux in the hexagonal mesh by which the Atucha-2 core is represented. The scope of this activity is to evaluate the effect of obliquely inserted control rod on neutron flux in order to validate the RELAP5-3D{sup C}/NESTLE three dimensional neutron kinetic coupled thermal-hydraulic model, applied by GRNSPG/UNIPI for performing selected transients of Chapter 15 FSAR of Atucha-2. (authors)

  2. Flux mapping algorithm (FMA) for 700 MWe PHWR

    International Nuclear Information System (INIS)

    Sonavani, Manoj; Ingle, V.J.; Singhvi, P.K.; Raj, Manish; Fernando, M.P.S.; Kumar, A.N.

    2012-01-01

    For large reactor like 700 MWe PHWR effective spatial control is essential and is provided by RRS. For spatial control purpose reactor core is divided into 14 power zones. Corresponding to each zone is a light water zonal compartment. The 14 ZCCs are located in two radial planes, each containing 7 ZCCs. For each zone, power measurement is carried out using inconel (3 pitch long) self powered neutron detector (SPND) at appropriate location close to the respective ZCC. Since the zone power as obtained by the healthy zone control detector (ZCD) reading belonging to a particular zone may not correspond to its actual power because the detector per zone, measure only average fluxes but the zone extends over a large core region. Therefore accurate estimation of zone power calibration factors is required to estimate the zone powers and also to provide effective spatial power control to avoid the xenon induced spatial power oscillations in large PHWRs like 700 and 540 MWe Reactors. This accurate calculation of zone power is carried out by FMS which uses λ modes in its algorithm. Flux at any point inside the reactor can be represented in terms of the linear combination of these modes. Coefficients used in the expansion are called combining coefficient. If the readings of the detectors are known, then combining coefficients can be estimated by simple matrix operations. Once these combining coefficients are known, flux at any point inside the reactor can be found. (author)

  3. Evolution of Flux Mapping System (FMS) from 540 MWe to 700 MWe Indian PHWR: design perspective

    International Nuclear Information System (INIS)

    Sonavani, Manojkumar; Kelkar, M.G.; Singhvi, P.K.; Roy, S.; Ingle, V.J.

    2013-01-01

    The Flux Mapping System (FMS) of 700 MWe PHWR computes a detailed flux/power distribution of the reactor core using modal synthesis method and is also generate setback on different parameters by monitoring thermal neutron flux at more than 100 points inside the reactor core. These types of setbacks are introduced first time in Indian PHWRs. The paper brings out the Evolution of Flux Mapping System (FMS) from 540 MWe to 700 MWe and the overall design philosophy. The paper emphasizes on comparisons between 540 MWe and 700 MWe design, considerations for architectural design and setbacks for 700 MWe. (author)

  4. Leptospira Exposure and Waste Pickers: A Case-Control Seroprevalence Study in Durango, Mexico

    Science.gov (United States)

    Alvarado-Esquivel, Cosme; Hernandez-Tinoco, Jesus; Sanchez-Anguiano, Luis Francisco; Ramos-Nevarez, Agar; Cerrillo-Soto, Sandra Margarita; Guido-Arreola, Carlos Alberto

    2015-01-01

    Background Infection with Leptospira may occur by contact with Leptospira-infected animals. Waste pickers are in contact with rodents and dogs while picking in the garbage. Whether waste pickers are at risk for Leptospira infection is largely unknown. This study was aimed to determine the association of Leptospira IgG seroprevalence with the occupation of waste picking, and to determine the epidemiological characteristics of the waste pickers with Leptospira exposure. Methods Through a case-control study, we determined the seroprevalence of anti-Leptospira IgG antibodies in 90 waste pickers and 90 age- and gender-matched control subjects in Durango City, Mexico using an enzyme immunoassay. Data were analyzed by bivariate and multivariate analyses. Results The prevalence of anti-Leptospira IgG antibodies was similar in waste pickers (4/90: 4.4%) to that in control subjects (5/90: 5.6%) (P = 1.00). Bivariate analysis showed that Leptospira exposure in waste pickers was associated with increasing age (P = 0.009), no education (P = 0.008), and consumption of rat meat (P = 0.04). However, these associations were no longer found by multivariate analysis. Leptospira exposure in waste pickers was not associated with health status, duration in the activity, wearing hand gloves and facemasks, history of injuries with sharp material of the garbage, or contact with animals or soil. Conclusions This is the first study about Leptospira exposure in waste pickers. Results suggest that waste pickers are not at increasing risk for Leptospira exposure in Durango City, Mexico. Further research with a larger sample size to elucidate the association of Leptospira exposure with waste picking activity is needed. PMID:26124911

  5. Leptospira Exposure and Waste Pickers: A Case-Control Seroprevalence Study in Durango, Mexico.

    Science.gov (United States)

    Alvarado-Esquivel, Cosme; Hernandez-Tinoco, Jesus; Sanchez-Anguiano, Luis Francisco; Ramos-Nevarez, Agar; Cerrillo-Soto, Sandra Margarita; Guido-Arreola, Carlos Alberto

    2015-08-01

    Infection with Leptospira may occur by contact with Leptospira-infected animals. Waste pickers are in contact with rodents and dogs while picking in the garbage. Whether waste pickers are at risk for Leptospira infection is largely unknown. This study was aimed to determine the association of Leptospira IgG seroprevalence with the occupation of waste picking, and to determine the epidemiological characteristics of the waste pickers with Leptospira exposure. Through a case-control study, we determined the seroprevalence of anti-Leptospira IgG antibodies in 90 waste pickers and 90 age- and gender-matched control subjects in Durango City, Mexico using an enzyme immunoassay. Data were analyzed by bivariate and multivariate analyses. The prevalence of anti-Leptospira IgG antibodies was similar in waste pickers (4/90: 4.4%) to that in control subjects (5/90: 5.6%) (P = 1.00). Bivariate analysis showed that Leptospira exposure in waste pickers was associated with increasing age (P = 0.009), no education (P = 0.008), and consumption of rat meat (P = 0.04). However, these associations were no longer found by multivariate analysis. Leptospira exposure in waste pickers was not associated with health status, duration in the activity, wearing hand gloves and facemasks, history of injuries with sharp material of the garbage, or contact with animals or soil. This is the first study about Leptospira exposure in waste pickers. Results suggest that waste pickers are not at increasing risk for Leptospira exposure in Durango City, Mexico. Further research with a larger sample size to elucidate the association of Leptospira exposure with waste picking activity is needed.

  6. A review of current knowledge on the effects of hydrogen on the pressure tubes of Ontario Hydro operating reactors

    International Nuclear Information System (INIS)

    Leger, M.

    1982-01-01

    Since the occurrence of cracking in Zr-2.5 wt% Nb pressure tubes in Pickering 'A' units 3 and 4 in 1974/75 a great deal of information on the behaviour of hydrogen in pressure tube materials has been generated through research effort by both AECL and Ontario Hydro. In order to use this information effectively and to provide direction and co-ordination for ongoing research, a review of available information and current concerns on hydrogen in pressure tubes was undertaken. The review was divided into two main areas of interest: hydrogen ingress and hydride effects. The uncertainties in the rates of hydrogen ingress into the pressure tubes have been found to be very large. On the basis of current knowledge, predictions of the future behaviour of pressure tubes due to hydride effects are extremely difficult

  7. Innovations in PHWR design, integration of nuclear power stations into power systems and role of small size nuclear power plants in a developing country

    International Nuclear Information System (INIS)

    Mehta, S.K.; Kakodkar, A.; Balakrishnan, M.R.; Ray, R.N.; Murthy, L.G.K.; Chamany, B.F.; Kati, S.L.

    1977-01-01

    PHWR concept of thermal reactors has been considered with a view to exploiting the limited resources of natural uranium and keeping in mind the projected nuclear power programme covering fast breeder reactors. Experience in engineering of current PHWR units in India, gradual build up of necessary infrastructure and operational experience with one unit, have helped in building up design and technological capability in the country. The R and D facilities have been so planned that additional data required for the design of bigger reactor units (i.e.500/600 MWe) could be generated with minimal augmentation. Satisfactory operation of a nuclear power station demands certain prerequisites from the connected power system. The grid should have load patterns suitable for base load operation of these stations, should be stiff so far as voltage and frequency fluctuations are concerned and should have high reliability. A typical power grid in this country is characterised by heavy loads during peak hours and very light loads during night. Regional grids are of small size and the few interconnections existing between the regional grids consist of weak tie lines. Amongst all types of the power stations, it is the nuclear system which undergoes maximum strain and economic penalty while operating when connected to such a power system. Consistent with the above, phase installation of small-size power reactor units of about 200 MWe capacity may facilitate setting up of larger unit sizes at a later date. The effect of any possible reduction in the capital cost of a larger unit power station will enable the power station to partially meet the demand of the more productive types of loads. This paper deals with some of the major design changes that are being incorporated in the PHWR type power reactors currently being set up and the research and development back-up required for the purpose. Since the unit sizes of the power reactors presently contemplated are small compared to nuclear

  8. A three-dimensional analyses of fluid flow and heat transfer for moderator integrity assessment in PHWR

    International Nuclear Information System (INIS)

    Bang, K. H.; Lee, J. Y.; Yoo, S. O.; Kim, M. W.; Kim, H. J.

    2002-01-01

    Three-dimensional analyses of fluid flow and heat transfer has been performed in this study. The simulation of SPEL experimental work and comparison with experimental data has been carried out to verify the analyses models. Moreover, to verify the CANDU-6 reactor type, analyses of fluid flow and heat transfer in the calandria under the condition of steady state has been performed using FLUENT code, which is the conventional code for a three-dimensional analyses of fluid flow and heat transfer for moderator integrity assessment in PHWR thermal-hydraulics. It is found that the maximum temperature in the moderator is 347K (74 ), so that the moderator has the enough subcoolability to ensure the integrity of pressure tube during LOCA conditions

  9. A comparison of LOCA analysis using SMOKIN and CERBERUS codes

    Energy Technology Data Exchange (ETDEWEB)

    Younis, M H [Atomic Energy of Canada Ltd., Mississauga, ON (Canada); Gaboury, G [Ontario Hydro, Toronto, ON (Canada)

    1996-12-31

    This paper presents the results of a comparison of the analyses of a postulated Loss of Coolant Accident (LOCA) in Pickering NGS A reactors using the two neutron kinetics codes SMOKIN and CERBERUS. Both codes have been used to simulate the space-time neutronic behaviour of CANDU-PHWR reactors. The main objective of the present study is to evaluate the accuracy with which SMOKIN can predict power transients compared to CERBERUS. The comparison shows that the two codes produce similar bulk power and reactivity transients. However, SMOKIN was found to overestimate the power transient (relative to CERBERUS) in some regions of the core, which is indicative of the spatial differences between the two codes. It was demonstrated that part of this overestimate is due to the use of reaction-rate averaged fuel properties in SMOKIN, compared to instantaneous fuel properties in CERBERUS. (author). 5 refs., 3 tabs., 6 figs.

  10. Modelling of activity transport in PHWR

    International Nuclear Information System (INIS)

    Veena, S.N.; Rangarajan, S.; Narasimhan, S.V.; Horvath, G.L.

    2000-01-01

    The modelling of mass and activity transport in PHWR is of importance in predicting the build up of radiation field in and around the Primary Heat Transport system which will consequently help in planning the Dilute Chemical Decontamination and man rem budgeting. Modeling also helps in understanding the different parameters controlling the transport behaviour. Some of the important parameters include coolant chemistry like pH, physical parameters like temperature, the nature of the corrosion film and hence the effect of passivation techniques. VVER code for activity transport uses six nodes for the primary system and is essentially devised for stainless steel system. In the present work though based on this model, major modifications have been incorporated to suit the PHWR conditions. In the code, the PHT system of PHWR is suitably divided into 14 nodes, 5 in-core and 9 out of core nodes based on material and heat transfer properties. This paper describes the mechanisms involved in the various processes like generation of corrosion products, their release as well as their transport into the primary coolant, the activation of inactive corrosion product nuclides and the build up of radiation field due to 60 Co around the PHT system. (author)

  11. Annual report/1979

    International Nuclear Information System (INIS)

    1980-04-01

    Primary energy demand in Ontario in 1979 was up by 2.9 percent, compared to 2.7 percent in the previous year. Revised forecasts issued in January 1980 indicate Ontario's need for electricity is expected to grow by an average of 3.4 percent annually to the year 2000. Nuclear generation provided 29 percent of the total energy made available by Hydro, and Hydro's eight reactors at Pickering and Bruce continued to rank in the top 36 - four in the top 10 - when compared to the permance of 104 of the world's largest reactors. The provinical legislature's Select Committee on Hydro Affairs examined the safety of the CANDU system and concluded that is is 'acceptably safe'. Faced with reduced forecasts of electrical demands to the year 2000 the Board of Directors decided to stretch out the construction schedule of the Darlington station, to halt construction of the second half of the Bruce Heavy Water Plant D, and to complete but mothball the first half. Construction of Bruce Heavy Water Plant B was completed early in 1979. The A plant produced 599.8 megagrams of reactor-grade heavy water. A control room simulator for Bruce A nuclear generating station was ordered. Agreement was reached on rebuilding faulty boilers at Pickering B. A total of 757.6 megagrams of uranium was used to produce electrical energy and steam. Ontario Hydro continued involvement in uranium exploration. Studies on radioactive waste disposal are being carried out, with emphasis on interim storage and transportation. (LL)

  12. The safety of Ontario's nuclear power reactors. A scientific and tecnical review. Vol. 1: Report to the Minister, technical report and annexes

    International Nuclear Information System (INIS)

    Hare, F.K.

    1988-01-01

    In December 1986 a study of the safety of the design, operating procedures and emergency plans associated with Ontario Hydro's nuclear generating plants was commissioned by the government of the province of Ontario. After receiving briefs from many interested groups and individuals, visiting the power plants, and consulting with nuclear industry and regulatory representatives in Canada and other countries, the commissioner presented this report to the Minister of Energy for Ontario. His major conclusion is that Ontario Hydro reactors are being operated safely and at high standards of technical performance. No significant adverse impact has been detected in either the work force or the public. The risk of accidents serious enough to affect the public adversely can never be zero, but is very remote. Major recommendations are that: Ontario Hydro re-examine its operational organization closely and commission a study of factors affecting human performance; and, that priority be given to finding a solution to pressure tube performance problems and to improving in-reactor monitoring. Sixteen other recommendations are presented relating to research and development, information exchange with other organizations, reactor performance, training, severe accident analysis, the provincial nuclear emergency plan, epidemiological studies, the Atomic Energy Control Board, public hearings, and women in the nuclear industry. This volume contains a detailed technical analysis of the CANDU system, its associated safety procedures, emergency measures required in the case of a nuclear accident, and regulation of the Canadian nuclear industry. Annexes provide further details on the operation of the Ontario Nuclear Safety Review

  13. Direct harvesting of Helium-3 (3He) from heavy water nuclear reactors

    International Nuclear Information System (INIS)

    Bentoumi, G.; Didsbury, R.; Jonkmans, G.; Rodrigo, L.; Sur, B.

    2013-01-01

    The thermal neutron activation of deuterium inside a heavy-water-moderated or -cooled nuclear reactor produces a build-up of tritium in the heavy water. The in situ decay of tritium can, for certain reactor types and operating conditions, produce potentially useable amounts of 3 He, which can be directly extracted via the heavy-water cover gas without first separating, collecting and storing tritium outside the reactor. It is estimated that the amount of 3 He available for recovery from the moderator cover gas of a 700 MWe class Pressurized Heavy Water Reactor (PHWR) ranges from 0.1 to 0.7 m 3 (STP) per annum, varying with the tritium activity buildup in the moderator. The harvesting of 3 He would generate approximately 12.7 m 3 (STP) of 3 He, worth more than $30M at current market rates, over a typical 25-year operating cycle of the PHWR. This paper discusses the production of 3 He in the moderator of a PHWR and its extraction from the 4 He moderator cover gas system using conventional methods. (author)

  14. Toxocariasis in waste pickers: a case control seroprevalence study.

    Directory of Open Access Journals (Sweden)

    Cosme Alvarado-Esquivel

    Full Text Available BACKGROUND: The epidemiology of Toxocara infection in humans in Mexico has been poorly explored. There is a lack of information about Toxocara infection in waste pickers. AIMS: Determine the seroepidemiology of Toxocara infection in waste pickers. METHODS: Through a case control study design, the presence of anti-Toxocara IgG antibodies was determined in 90 waste pickers and 90 age- and gender-matched controls using an enzyme-linked immunoassay. Associations of Toxocara exposure with socio-demographic, work, clinical, and behavioral data of the waste pickers were also evaluated. RESULTS: The seroprevalence of anti-Toxocara IgG antibodies was significantly higher in waste pickers (12/90: 13% than in control subjects (1/90: 1% (OR = 14; 95% CI: 2-288. The seroprevalence was not influenced by socio-demographic or work characteristics. In contrast, increased seroprevalence was found in waste pickers suffering from gastritis, and reflex and visual impairments. Multivariate analysis showed that Toxocara exposure was associated with a low frequency of eating out of home (OR = 26; 95% CI: 2-363 and negatively associated with consumption of chicken meat (OR = 0.03; 95% CI: 0.003-0.59. Other behavioral characteristics such as animal contacts or exposure to soil were not associated with Toxocara seropositivity. CONCLUSIONS: 1 Waste pickers are a risk group for Toxocara infection. 2 Toxocara is impacting the health of waste pickers. This is the first report of Toxocara exposure in waste pickers and of associations of gastritis and reflex impairment with Toxocara seropositivity. Results warrant for further research.

  15. Darlington NGD valve packing program

    International Nuclear Information System (INIS)

    Spence, C.G.

    1995-01-01

    Darlington NGD is a four unit CANDU 1000 nuclear generation station, located on the shores of Lake Ontario, approximately 45 miles east of Toronto. The CANDU design is a Pressurized Heavy Water Reactor (PHWR), each unit at Darlington is designed to produce 940MWe. The commissioning phase of the station was completed in the spring of 1993. (author)

  16. Nanocellulose-stabilized Pickering emulsions and their applications.

    Science.gov (United States)

    Fujisawa, Shuji; Togawa, Eiji; Kuroda, Katsushi

    2017-01-01

    Pickering emulsion, which is an emulsion stabilized by solid particles, offers a wide range of potential applications because it generally provides a more stable system than surfactant-stabilized emulsion. Among various solid stabilizers, nanocellulose may open up new opportunities for future Pickering emulsions owing to its unique nanosizes, amphiphilicity, and other favorable properties (e.g. chemical stability, biodegradability, biocompatibility, and renewability). In this review, the preparation and properties of nanocellulose-stabilized Pickering emulsions are summarized. We also provide future perspectives on their applications, such as drug delivery, food, and composite materials.

  17. The case for new nuclear

    International Nuclear Information System (INIS)

    Luxat, J.C.

    2013-01-01

    Over a 22 year period from 1971 to 1993 a total of 20 reactor units were brought into service - an average of approximately one unit per year. Ontario Hydro constructed the four-unit Pickering A station, four units at Bruce A, four units at Pickering B, four units at Bruce B and four units at Darlington during this period. This represents a capacity of nearly 14,000 MW, as shown in Figure 1. During this period there was a large increase in industrial capacity in Ontario, particularly in manufacturing, driven in large measure by the incentives offered by low electricity prices, skilled workers and a good health care system. Subsequently in the mid-1990's the Pickering A and Bruce A units were laid up and maintenance efforts were focused on the Pickering B, Bruce B and Darlington stations. Two of the four units at Pickering A were returned to service in the early 2000's and the four units of Bruce A were returned to service with two units being refurbished. By 2010 nuclear capacity in the province had returned to 12,800 MW. The Ontario Long Term Energy Plan (LTEP) announced at the beginning of December does not include new build nuclear but does include refurbishment of the Darlington station as well as two units at Bruce A and four units at Bruce B. The six units at Pickering will be shut down by 2020. As shown in Figure 1, this will reduce the nuclear capacity from the current 12,800 MW to 8000 MW when the Pickering A and B units are removed from service in 2020 and the refurbishment of Darlington and Bruce units proceeds starting in 2016 and projected to complete by 2031. This will be the lowest nuclear generating capacity in the province since 1985. (author)

  18. 3D modeling of the primary circuit in the reactor pressure vessel of a PHWR

    Energy Technology Data Exchange (ETDEWEB)

    Ramajo, Damian, E-mail: dramajo@santafe-conicet.gov.ar; Corzo, Santiago; Schiliuk, Nicolas; Nigro, Norberto

    2013-12-15

    A computational fluid dynamics (CFD) simulation of the reactor pressure vessel (RPV) of the pressurized heavy water reactor (PHWR) of 745 electrical MW Atucha II nuclear power plant was carried out. A three dimensional (3D) detailed model was employed to simulate coolant circuit considering the upper and lower plenums, the downcomer and the hot and cold legs. Control rods and coolant channel tubes at the upper plenum were included to quantify the mixing flow with more realism. The whole set of 451 coolant channels were modeled by means of a zero dimensional methodology. That is, the effect of each coolant channel was modeled through the introduction of a source point at the upper plenum and a sink point at the lower plenum. For each coupled sink/source points (SSP) the mass, momentum and energy balance were solved considering the local pressure difference and the temperature between the corresponding points where sinks and sources were placed. Based on this strategy, three models with increasingly level of approximation were implemented. For the first model the 451 coolant channels were reduced to only 57 pairs of SSP to represent all the coolant channels, concentrating the effect of several coolant channels in a unique pair of sink and source while taking into account geometric design details. For the second model, 225 pairs of SSP were introduced. Finally, for the third model each one of the 451 coolant channels were modeled by means of one pair of SSP. Depending on the coolant channel location, the radial power distribution and the pressure loss caused by the corresponding flow restrictor present by design were considered. Simulations carried out give insight in the complexity of the flow. As expected, the greater the details of the model the better the accuracy reached in the representation of the RPV behavior. In addition, the flow distributor located at the lower plenum showed to be very efficient since, the mass flow at each channel was found to be fairly

  19. Multi-Unit Aspects of the Pickering Generating Station

    Energy Technology Data Exchange (ETDEWEB)

    Morison, W. G. [Atomic Energy of Canada Ltd, Sheridan Park, ON (Canada)

    1968-04-15

    The Pickering nuclear generating station is located on the north shore of Lake Ontario, about 20 miles east of the city of Toronto, Canada. The station has been planned and laid out on an eight-unit station, four units of which have now been authorized for construction. Each of these four units consists of a single heavy-water moderated and cooled CANDU-type reactor and auxiliaries coupled to a single tandem compound turbine generator with a net output of approximately 500 MW(e). The units are identical and are scheduled to come into operation at intervals of one year from 1970 to 1973. The station has been planned with central facilities for: administration maintenance laboratories, stores, change rooms, decontamination and waste management services. A common control centre, cooling water intake and discharge system, and spent fuel storage bay for four units has been arranged. A feature of the multi-unit station is a common containment system. Cost savings in building a number of identical units on the same site result from a single exclusion area, shared engineering costs, equipment purchase contracts for four identical components, and efficient use of construction plant. Operating cost savings are anticipated in the use of a common operating and maintenance staff and spare parts inventory. The plant has been arranged to minimize problems of operating, commissioning and constructing units at the same time on the same site. The layout and construction sequence have been arranged so that the first unit can be commissioned and operated with little or no interference from the construction forces working on succeeding units. During the construction phase barriers will be erected in the common control centre between operating control equipment and that being installed. Operations and construction personnel will enter the plant by separate routes and work in areas separated by physical barriers. (author)

  20. Tritium in groundwater investigation at the Pickering Nuclear Generating Station

    International Nuclear Information System (INIS)

    DeWilde, J.; Yu, L.; Wootton, R.; Belanger, D.; Hansen, K.; McGurk, E.; Teare, A.

    2001-01-01

    Ontario Power Generation Inc. (OPG) investigated tritium in groundwater at the Pickering Nuclear Generating Station (PNGS). The objectives of the study were to evaluate and define the extent of radionuclides, primarily tritium, in groundwater, investigate the causes or sources of contamination, determine impacts on the natural environment, and provide recommendations to prevent future discharges. This paper provides an overview of the investigations conducted in 1999 and 2000 to identity the extent of the tritium beneath the site and the potential sources of tritium released to the groundwater. The investigation and findings are summarized with a focus on unique aspects of the investigation, on lessons learned and benefits. Some of the investigative techniques discussed include process assessments, video inspections, hydrostatic and tracer tests, Helium 3 analysis for tritium age dating, deuterium and tritium in soil analysis. The investigative techniques have widespread applications to other nuclear generating stations. (author)

  1. An infrared technique for on-line detection of orientation of PHWR fuel pellets

    Energy Technology Data Exchange (ETDEWEB)

    Behere, P G [Bhabha Atomic Research Centre, Tarapur (India). Advanced Fuel Fabrication Facility

    1994-12-31

    The PHWR (Pressurised Heavy Water Reactor) fuel pellets fabricated in a fuel fabrication plant are cylindrical in shape and after sintering acquire a nominal size of 14.3 mm diameter and 17 mm height. These pellets have dish at one end while the other end is flat. The dish is provided to accommodate fission gases and thermal expansion. The sintered pellets are examined for physical damages such as cracks, chippings etc. and these should have one particular orientation while loading. A technique is suggested to solve the problems arising during the fuel pellet loadings. 3 figs.

  2. An infrared technique for on-line detection of orientation of PHWR fuel pellets

    International Nuclear Information System (INIS)

    Behere, P.G.

    1994-01-01

    The PHWR (Pressurised Heavy Water Reactor) fuel pellets fabricated in a fuel fabrication plant are cylindrical in shape and after sintering acquire a nominal size of 14.3 mm diameter and 17 mm height. These pellets have dish at one end while the other end is flat. The dish is provided to accommodate fission gases and thermal expansion. The sintered pellets are examined for physical damages such as cracks, chippings etc. and these should have one particular orientation while loading. A technique is suggested to solve the problems arising during the fuel pellet loadings. 3 figs

  3. Seismic analysis of mechanical systems at Pickering NGS

    International Nuclear Information System (INIS)

    Ghobarah, A.

    1995-11-01

    The objective of this study is to assess the seismic withstand capacity of selected safety-related mechanical systems associated with the Pressure Relief Duct (PRD) at the Pickering A Nuclear Generating Station. These systems are attached to the PRD and include the Emergency Coolant Injection System piping, the Vacuum Ducts, the Emergency Water Storage System, the PRD expansion joint seals and the PRD to Reactor Building joint seals. The input support motion to the mechanical systems is taken to be the seismic response of the PRD determined in an earlier study using various levels of predetermined ground response spectrum envelope. (author). 12 refs., 13 tabs., 48 figs

  4. AECB staff annual report on Pickering NGS for the year 1989

    International Nuclear Information System (INIS)

    1990-06-01

    This report presents a review of major licensing issues and the operational performance of Pickering NGS-A (Units 1-4) and Pickering NGS-B (Units 5-8) by the staff of the Atomic Energy Control Board (AECB) during 1989. Operations are monitored to ensure compliance with licensing requirements. This report is limited to those aspects that AECB staff consider to have particular safety significance. The number of infractions of the operating licence and the AECB Regulations doubled in 1989 compared to 1988. Three workers were exposed to radiation doses in excess of the regulatory limits. The AECB also found inadequate procedural compliance and an unacceptable level of housekeeping. Performance also requires improvement in response to AECB Health Physics appraisals; surveillance of systems by the Technical Section; chemical control performance; response to outstanding AECB action items; availability of special safety systems; operating memos, jumper records, call-ups and deficiency reports in effect; and fire fighting capability. Ontario Hydro has initiated a number of programs that are expected to result in improvements in these areas: an in-service station quality improvement plan; a program to improve and give assurance of compliance with the AECB Regulations, the operating licenses and the Operating Policies and Principles; a housekeeping and material condition improvement plan; and an action plan undertaken following radiation over-exposures. Given adequate resources and management support these programs should result in a noticeable improvement in station performance in 1990

  5. The breakup of OPG : a suggestion for accelerating competition in generation in Ontario

    International Nuclear Information System (INIS)

    2003-01-01

    Although wholesale and retail electricity markets in Ontario were opened to competition on May 1, 2002, the market cannot be said to be truly competitive because Ontario Power Generation (OPG) is still the dominant market participant controlling more than 25,000 MW of capacity, which gives it market power. The Association of Major Power Consumers in Ontario (AMPCO) has made specific proposals to the Macdonald Committee on how OPG could be restructured into several commercial generating companies, but it does not appear that OPG activities will be decontrolled in the next 2 or 3 years for the following 4 reasons: (1) the general state of the market for generation resource is poor following the collapse of Enron, (2) the government cannot afford to decontrol large quantities of OPG plants, (3) uncertainty over public policy regarding environmental regulations makes it difficult to decontrol fossil-fuelled plants, and (4) uncertainty over the return to service of Pickering A and Bruce A nuclear plants. Total OPG capacity is 25,855 MW including Pickering A. OPG's fossil-fuelled plants are mostly coal-fuelled and are under pressure from environmental groups to convert to gas. However, none of the plants are suitable for conversion. AMPCO strongly recommends that these plants should be operated in a commercial manner without unduly intrusive environmental regulation. Options for restructuring nuclear, fossil and large hydro plants were also presented along with a proposal to restructure OPG into multiple operating companies. It was concluded that the decontrol of OPG generation through the Market Power Mitigation Arrangement would result in a viable and liquid market, where prices are controlled by competitive forces. 2 refs., 2 tabs

  6. The PHWR of Siemens as appropriate type of the SMPR-class

    International Nuclear Information System (INIS)

    Herzog, G.; Doerfler, U.; Loos, F.

    1988-01-01

    Siemens started its NPP-activities with the development and construction of a number of small and medium size power reactor (SMPR) plants, using different reactor types (PHWRs, PWRs and BWRs). Siemens applied its proven technological modules successfully to all types of nuclear power plants as it is demonstrated by the high availability figures published every year. Based on the experience gained from Atucha I and II, the Argentinian engineering company ENACE (of which KWU holds 25% of the shares) has developed the ARGOS 380, a NPP in the SMPR-class, as an advanced continuation of the KWU PHWR series. The technology transfer provided by Siemens in the course of NPP construction includes all activities in the engineering, construction, manufacturing and erection/commissioning field. Additionally Siemens is prepared to assist in the transfer of manufacturing know-how. On the basis of its successful activities in this field for years, Siemens disposes of all instruments for an efficient know-how transfer. (orig.)

  7. Upgradation of design features of primary coolant pumps of Indian 220 MWe PHWR

    International Nuclear Information System (INIS)

    Sharma, S.S.; Mhetre, S.G.; Manna, M.M.

    1994-01-01

    Evolution in the design features of Primary Coolant Pump (PCP) had started in fifties for catering to stringent specification requirements of reactor coolant systems of larger capacity reactors of various kinds. Primary coolant pumps of PWR and PHWR are employed for circulating radioactive, pressurized hot water in a circuit consisting of reactor (heat source) and steam generator (heat sink). As primary coolant pump capacity decides the station capacity, larger capacity primary coolant pumps have been evolved. Since primary coolant pump pressure containing parts are part of Primary Heat Transport system envelope, the parts are designed, manufactured, inspected and tested in accordance with the applicable system guidelines. Flywheel is mounted on the motor shaft for increasing mass moment of inertia of pump motor rotor to meet the coast down requirements of reactor cooling system under Class-IV electrical power supply failure. Due to limited accessibility of the PCP (PCP installed in shut down accessible area), quick maintenance, condition monitoring, reliable shaft seal system/bearing system aspects have been of great concern to reactor owners and pump manufacturers. In this paper upgradation of design features of RAPS, MAPS and NAPS primary coolant pumps have been covered. (author). 4 figs., 1 tab

  8. 18-month outlook : an assessment of the reliability of the Ontario Electricity System

    International Nuclear Information System (INIS)

    2005-01-01

    This paper provides an 18 month forecast of the Ontario electricity system, as well as an outline of activities and recent developments relating to the issue of reliability. An additional aim of the paper was to identify potentially adverse conditions that may require adjustment or coordination of maintenance plans for generation and transmission equipment. Requests for proposals (RFPs) for renewable generation within the specified time-frame were also discussed, as well as the return to service of Ontario Power Generation's Pickering Unit 1. Reduced reserve levels for the summer of 2005 were anticipated, and details of forecasted peak demand, generator maintenance, new generation and price-responsive demand adjustments and forced outage rates were presented. It was suggested that adequate market mechanisms were in place to manage reserve levels. Developments concerning the new Parkway Transformer station were reviewed. A resource outlook was provided. Available resources were expected to exceed planning requirements with the exception of 6 weeks in the summer of 2005. A projected capacity increase was also anticipated, due to the return of Pickering 1 and an additional 515 MW in the fall of 2005. Price-responsive demands were forecasted to exceed 650 MW due to increases in dispatchable load. It was suggested that in order to ensure power demand during peak periods, imports may be required under extreme weather conditions, combined with the possible deferral or cancellation of generation maintenance. Transmission impacts due to shutdowns were discussed. Voltage system requirements were reviewed, along with details of the installation of additional shunt capacitors and transformer controls. The electricity market was reviewed in the context of current overall economic conditions. Data forecasting normal peak demand was presented for the entire outlook period. 19 tabs., 10 figs

  9. AUTOSORO: A fuel management study program for Ontario Hydro CANDU reactors

    International Nuclear Information System (INIS)

    Wilk, L.

    1988-01-01

    A computer program, AUTOSORO, has been developed to automatically simulate an Ontario Hydro CANDU reactor core for any time duration according to user-defined on-power refuelling criteria. It is a three-dimensional two-group diffusion code coupled to refuelling decision logic at three screening levels: burnup, coupled neighbor, full-core. A central feature is a projected local-iteration scheme for predicting fuelling-induced local neutron flux changes. Comparisons of AUTOSORO results with actual histories demonstrate that it will be an excellent productivity tool for future in-core fuel management studies, reducing several man-months of effort to several man-hours

  10. Post Chernobyl safety review at Ontario Hydro

    International Nuclear Information System (INIS)

    Frescura, G.M.; Luxat, J.C.; Jobe, C.

    1991-01-01

    It is generally recognized that the Chernobyl Unit 4 accident did not reveal any new phenomena which had not been previously identified in safety analyses. However, the accident provided a tragic reminder of the potential consequences of reactivity initiated accidents (RIAs) and stimulated nuclear plant operators to review their safety analyses, operating procedures and various operational and management aspects of nuclear safety. Concerning Ontario Hydro, the review of the accident performed by the corporate body responsible for nuclear safety policy and by the Atomic Energy Control Board (the Regulatory Body) led to a number of specific recommendations for further action by various design, analysis and operation groups. These recommendations are very comprehensive in terms of reactor safety issues considered. The general conclusion of the various studies carried out in response to the recommendations, is that the CANDU safety design and the procedures in place to identify and mitigate the consequences of accidents are adequate. Improvements to the reliability of the Pickering NGSA shutdown system and to some aspects of safety management and staff training, although not essential, are possible and would be pursued. In support of this conclusion, the paper describes some of the studies that were carried out and discusses the findings. The first part of the paper deals with safety design aspects. While the second is concerned with operational aspects

  11. Secondary cycle water chemistry for 500 MWe pressurised heavy water reactor (PHWR) plant: a case study

    International Nuclear Information System (INIS)

    Bhandakkar, A.; Subbarao, A.; Agarwal, N.K.

    1995-01-01

    In turbine and secondary cycle system of 500 MWe PHWR, chemistry of steam and water is controlled in secondary cycle for prevention of corrosion in steam generators (SGs), feedwater system and steam system, scale and deposit formation on heat transfer surfaces and carry-over of solids by steam and deposition on steam turbine blades. Water chemistry of secondary side of SGs and turbine cycle is discussed. (author). 8 refs., 2 tabs., 1 fig

  12. Trend of R and D publications in pressurised heavy water reactors: A study using INIS and other databases

    International Nuclear Information System (INIS)

    Kumar, V.; Kalyane, V.L.; Prakasan, E.R.; Kumar, A.; Sagar, A.; Mohan, L.

    2004-01-01

    Digital databases INIS (1970-2002), INSPEC (1969-2002), Chemical Abstracts (1977-2002), ISMEC (1973-June 2002), Web of Sciences (1974-2002), and Science Citation Index (1982-2002), were used for comprehensive retrieval of bibliographic details of research publications on Pressurized Heavy Water Reactor (PHWR) research. Among the countries contributing to PHWR research, India (having 1737 papers) is the forerunner followed by Canada (1492), Romania (508) and Argentina (334). Collaboration of Canadian researchers with researchers of other countries resulted in 75 publications. Among the most productive researchers in this field, the first 15 are from India. Top three contributors to PHWR publications with their respective authorship credits are: H.S. Kushwaha (106), Anil Kakodkar (100) and V. Venkat Raj (76). Prominent interdomainary interactions in PHWR subfields are: Specific nuclear reactors and associated plants with General studies of nuclear reactors (481), followed by Environmental sciences (185), and Materials science (154). Number of publications dealing with Geosciences aspect of environmental sciences are 141. Romania, Argentina, India and Republic of Korea have used mostly (≥75%) non-conventional media for publications. Out of the 4851 publications, 1228 have been published in 292 distinct journals. Top most journals publishing PHWR papers are: Radiation Protection and Environment (continued from: Bulletin of Radiation Protection since 1997), India (115); Nuclear Engineering International, UK (84); and Transactions of the American Nuclear Society, USA (68). (author)

  13. Fatigue cycles evaluation of 500 MWe PHWR coolant channel sealdisc

    International Nuclear Information System (INIS)

    Chawla, D.S.; Vaze, K.K.; Kushwaha, H.S.; Gupta, K.S.; Bhambra, H.S.

    1998-07-01

    At each end of coolant channel there is one sealing plug assembly. The sealdisc is a part of sealing plug assembly. The sealdisc is used to avoid leakage of heavy water. The importance of sealdisc can be understood by the fact that there are 784 sealdiscs in one 500 MWe PHWR unit. During the life time of reactor the sealdisc will be subjected to cyclic loads due to reactor startup, shutdown, power setback and also due to refuelling operations. Excessive reversal of stresses may lead to fatigue failure. The sealdisc failure may cause loss of coolant accidents. Since sealdisc is safety class 1 component, it has to be qualified according to ASME Section III Division 1 NB. For cyclic loads, the fatigue analysis is essential to assess the allowable number of cycles and also to check the total usage factor due to different cyclic loads. To evaluate the allowable fatigue cycles, the analysis is carried out using finite element method. The present report deals with the fatigue cycles evaluation of 500 MWe PHWR sealdisc. The finite element model having eight noded axisymmetric elements is used for the analysis. The various loads considered in the analysis are mechanical loads arising due to refuelling operations and number of temperature-pressure transients. During refuelling, the sealdisc is removed and reinstalled back by use of fuelling machine ram which applies load at centre as well as at rocker point of sealdisc. The stress analysis is carried out for each stage of loading during refuelling and fatigue cycles are evaluated. For temperature transient, decoupled thermal analysis is carried out. At various instants of time, the stresses are computed using temperatures calculated in thermal analysis. The pressure variation is also considered along with temperature variation. The fatigue cycles are evaluated for each transient using maximum alternating stress intensities. The usage factors are calculated for various temperature/pressure transients and refuelling loads

  14. Ring thermal shield piping modification at Pickering Nuclear Generating Station 'A' Unit 1

    International Nuclear Information System (INIS)

    Brown, R.; Cobanoglu, M.M.

    1995-01-01

    Each of the four Pickering Nuclear Generating Station A (PNGSA) CANDU units was constructed with its reactor and dump tank surrounded by a concrete Calandria Vault (CV). The Ring Thermal Shield (RTS) system at PNGSA units is a water cooled structure with internal cooling channels with the purpose of attenuating excessive heat flux from the calandria shell to the end shield rings and adjoining concrete (Figure 1). In newer CANDU units the reactor calandria vessel is surrounded by a large water filled shield tank which eliminates the requirement for the RTS system. The RTS structures are situated in the space between the calandria and the vault walls. Each RTS is assembled from eight flat sided carbon steel segments, tilted towards the calandria and supported from the end shield rings. Cooling water to the RTS is supplied by carbon steel cooling pipes with a portion of the pipe run embedded in the vault walls. Flow through each RTS is divided into two independent circuits, having an inlet and an outlet cooling line. There are four locations of RTS inlet and outlet cooling lines. The inlet lines are located at the bottom and the outlet lines at the top of the RTS. The 'L' shaped section of RTS inlet and outlet cooling lines, from the RTS waterbox to the start of embedded portion at the concrete wall, had become defective due to corrosion induced by excessive Moisture levels in the calandria vaults. An on-line leak sealing capability was developed and placed in service in all four PNGSA units. However, a leak found during the 1994 Unit 1 outage was too large,to seal with the current capability, forcing Ontario Hydro (OH) to develop a method to replace the corroded pipes. The repair project was subject to some lofty performance targets. All tools had to be able to withstand dose rates of up to 3000 Rem/hour. These tools, along with procedures and personnel had to successfully repair the RTS system within 6 months otherwise a costly outage extension would result. This

  15. A demand/supply and price outlook for electricity in Ontario

    International Nuclear Information System (INIS)

    Dalton, J.

    2004-01-01

    This paper examined electricity pricing issues for both the immediate future as well as over the long term. The near term outlook resources for the summer of 2004 were reviewed. Intermediate critical supply and demand issues were projected with consideration given to the return of the Pickering A plant and coal phase out. In the long term, it was considered that pricing and demand would reflect conservation issues and demand side response, as well as the timing of Requests For Proposals (RFPs) and the phase out of coal-fired capacity. The impact of the coal phase-out in Ontario was examined, with particular reference to timing and market structure implications. Potential conservation impacts were presented and projected Ontario supply/demand balances were evaluated. The challenges facing the new market structure include pricing dynamics and a reliance on RFPs. The significance of specifying diversity objectives was also discussed. It was concluded that the Ontario Ministry of Energy should play a role in establishing targets for conservation, renewable energy and the overall supply of electricity. Rigorous analysis is necessary before specifying targets in terms of hydroelectric and nuclear generation as opposed to non-fossil generation. tabs., figs

  16. Preparation of Pickering emulsions through interfacial adsorption by soft cyclodextrin nanogels

    Directory of Open Access Journals (Sweden)

    Shintaro Kawano

    2015-11-01

    Full Text Available Background: Emulsions stabilized by colloidal particles are known as Pickering emulsions. To date, soft microgel particles as well as inorganic and organic particles have been utilized as Pickering emulsifiers. Although cyclodextrin (CD works as an attractive emulsion stabilizer through the formation of a CD–oil complex at the oil–water interface, a high concentration of CD is normally required. Our research focuses on an effective Pickering emulsifier based on a soft colloidal CD polymer (CD nanogel with a unique surface-active property.Results: CD nanogels were prepared by crosslinking heptakis(2,6-di-O-methyl-β-cyclodextrin with phenyl diisocyanate and subsequent immersion of the resulting polymer in water. A dynamic light scattering study shows that primary CD nanogels with 30–50 nm diameter assemble into larger CD nanogels with 120 nm diameter by an increase in the concentration of CD nanogel from 0.01 to 0.1 wt %. The CD nanogel has a surface-active property at the air–water interface, which reduces the surface tension of water. The CD nanogel works as an effective Pickering emulsion stabilizer even at a low concentration (0.1 wt %, forming stable oil-in-water emulsions through interfacial adsorption by the CD nanogels.Conclusion: Soft CD nanogel particles adsorb at the oil–water interface with an effective coverage by forming a strong interconnected network and form a stable Pickering emulsion. The adsorption property of CD nanogels on the droplet surface has great potential to become new microcapsule building blocks with porous surfaces. These microcapsules may act as stimuli-responsive nanocarriers and nanocontainers.

  17. Annual report, 1980

    International Nuclear Information System (INIS)

    1980-01-01

    Operations of Ontario Hydro, one of North America's largest utilities, for the year 1980 are described. A new energy-use strategy was evolved during 1980 which included maximizing use of electricity generated from indigenous sources to substitute for imported fossil fuels. Due to the consistently outstanding performance of the utility's nuclear plants at Pickering and Bruce, nuclear power supplied 34 percent of the total energy generated, up three percent from 1979. This is second only to hyraulic generation. Ontario Hydro's reactors, four of which led the world's power reactors with capacities exceeding 500 MW in overall capacity factor, continued to provide reliable generation. Ontario Hydro is a publicly-owned financially self-supporting utility. During 1980 steps were taken to reduce the difference in rates between rural and urban customers. Average rate increases to be implemented in January 1981 were 9.3 percent for municipal utilities, 9.6 percent to direct industrial customers, and 11.2 percent for direct rural customers. The average revenue from residential users was $0.0364 per kwh. Revenue was $2.8 billion on assets of $15.6 billion. (O.T.)

  18. Stresses imposed by coolant channel end shield interaction in 200 MWe PHWR

    International Nuclear Information System (INIS)

    Mehra, V.K.; Singh, R.K.; Soni, R.S.; Kushwaha, H.S.; Kakodkar, A.

    1983-01-01

    End shield of 200 MWe Pressurised Heavy Water Reactor (PHWR) is a composite tube sheet structure consisting of two circular tube sheets joined together by lattice tubes. Each lattice tube houses a coolant channel assembly which is connected to the end shield through shock absorber device. End shield assembly is suspended in the vault by hanger rods and its horizontal position is controlled by a set of pre-compressed springs. Coolant channel assemblies elongate due to their exposure to fast neutron flux in the reactor. This permanent elongation is monitored periodically. When growth of the channel exceeds a present value, it is prevented from further elongation by the shock absorbing device. Resultant force exerted on the end shield makes it move. This paper describes a numerical method used for evaluating these forces and movement of the end shield. Stresses produced by these forces are calculated by using finite element method. Typical stress values are verified by strain gauge measurements. (orig.)

  19. Xenon oscillation in a large PHWR core (Atucha II type): TRISIC code applicability

    International Nuclear Information System (INIS)

    Solanilla, Roberto

    2000-01-01

    A three dimensional nuclear reactor simulation code (TRISIC) was developed many years ago to design a PHWR (pressurizer heavy water reactors - Atucha type) based in the 'source-sink model' (heterogeneous theory). The limited processor computational performance available at that time was the constraint of the code when a detailed reactor description was necessary. A modern PC (pentium) code version with a full reactor core representation (461 fuel channels) including diagonal control rod banks and flux-reading detectors with theirs tube guide was used in the present paper for simulation of the Xenon transient when a local asymmetric perturbation was produced in a large core (Atucha II type). The results obtained and the computer time required for the 70 hour's simulation with an adequate time step, established the potential of the code to deal with this kind of transients. The paper shows that the method of TRISIC allows to detect and control azimuthal, radial and axial oscillation. This code is a proper way to elaborate a program of control rods movement from the flux reading detectors to damp the oscillation. TRISIC could also be a accurate tool to supervise the full core flux distribution in real time during the operation of the reactor. (author)

  20. Simulation of LOCA power transients of CANDU6 by SCAN/RELAP-CANDU coupled code system

    International Nuclear Information System (INIS)

    Hong, In Seob; Kim, Chang Hyo; Hwang, Su Hyun; Kim, Man Woong; Chung, Bub Dong

    2004-01-01

    As can be seen in the standalone application of RELAP-CANDU for LOCA analysis of CANDU-PHWR, the system thermal-hydraulic code alone cannot predict the transient behavior accurately. Therefore, best estimate neutronics and system thermal-hydraulic coupled code system is necessary to describe the transient behavior with higher accuracy and reliability. The purpose of this research is to develop and test a coupled neutronics and thermal-hydraulics analysis code, SCAN (SNU CANDU-PHWR Neutronics) and RELAP-CANDU, for transient analysis of CANDU-PHWR's. For this purpose, a spatial kinetics calculation module of SCAN, a 3-D CANDU-PHWR neutronics design and analysis code, is dynamically coupled with RELAP-CANDU, the system thermal-hydraulic code for CANDU-PHWR. The performance of the coupled code system is examined by simulation of reactor power transients caused by a hypothetical Loss Of Coolant Accident (LOCA) in Wolsong units, which involves the insertion of positive void reactivity into the core in the course of transients. Specifically, a 40% Reactor Inlet Header (RIH) break LOCA was assumed for the test of the SCAN/RELAP-CANDU coupled code system analysis

  1. Improved techniques for appendage attachment to PHWR fuel elements

    International Nuclear Information System (INIS)

    Raj, R.N.J.; Laxminarayana, B.; Narayanan, P.S.A.; Gupta, U.C.; Varma, B.P.; Sinha, K.K.

    1995-01-01

    Nuclear Fuel Complex, India switched-over to split-wart type PHWR fuel bundles in mid-80s. Since then over 60,000 bundles of this type have been fabricated for Indian PHWRs. After considering various technical aspects, resistance welding was chosen for appendage attachment to the fuel elements. The paper describes experiences in scaling up of the technique to industrial production of PHWR fuel bundles, design and development of special-purpose equipment for this purpose, and the QA procedures employed for regular production. It also deals with appendage welding of 37 Element fuel bundles and improvements planned in the appendage welding process. (author)

  2. Analysis of a PHWR slightly enriched fuel

    International Nuclear Information System (INIS)

    Notari, C.; Marajofsky, A.

    1994-01-01

    It is widely known that the use of slightly enriched uranium in PHWR reactors presents economic advantages derived from the fact that less uranium is required for producing the same amount of energy. Several studies related with the use of this alternative in Atucha I NPP have been performed. The fuel assembly geometry considered up to now has been almost identical to the natural uranium one. In this work a modification consisting in the use of annular pellets in the outer ring of the cluster is analyzed. This design produces several performance benefits. The redistribution of the power in the fuel improves the maximum to average bundle power ratio. The improvement achieved depends on the void volume in the pellets which at the same time represents a certain burnup decrease. These parameters (power ratios and burnup loss) are quantified for the Atucha I and Embalse NPPs. This design improves the fuel behaviour with respect to the burnup extension derived from the slight enrichment. It is also interesting in case an overall power increase is considered. (author). 16 refs, 8 figs, 1 tab

  3. In-calandria retention of corium in Indian PHWR - experimental simulations with decay heat

    International Nuclear Information System (INIS)

    Nayak, A.K.

    2015-01-01

    The severe accident at Fukushima has compelled the nuclear community to relook at the safety of existing nuclear power plants (NPP) against natural origin events of beyond design basis and prolonged station black out (SBO). A major lesson learned is to assess the capability of the safety systems to cool the reactor core and spent fuel storage facilities in the event of a prolonged station black out (SBO). Similar safety review is planned for the Indian Pressurized Heavy Water Reactors (PHWRs) considering a prolonged SBO. The Indian PHWR is a heavy water-moderated and cooled, natural uranium-fuelled reactor in which the horizontal fuel channels are submerged in a pool of heavy water moderator located inside the calandria vessel. The calandria vessel is surrounded by a calandria vault having large volume of light water. Concerns are raised that in the event of an unmitigated SBO, it may result into a low probable severe accident leading to core melt down. The core melt may further fail the calandria vessel in case the melt is not quenched. If the calandria vessel fails, the corium shall interact with the cold calandria vault water and concrete resulting in generation of large amount of non-condensable gases and steam which will lead to over pressurization of containment and may cause its failure. Therefore, in-calandria corium retention via external cooling using vault water can be considered as an important accident management program in PHWR. In this strategy, the core melt retains inside the calandria vessel by continually removing the stored heat and decay heat through outer surface of the vessel by cooling water and maintaining the integrity of the vessel. The present study focuses on experimental investigation in a scaled facility of an Indian PHWR to investigate the coolability of molten corium with simulated decay heat by using the calandria vault water. Molten borosilicate glass was used as the simulant due to its comparable heat transfer characteristics

  4. Measurement and computation for sag of calandria tube due to irradiation creep in PHWR

    International Nuclear Information System (INIS)

    Son, S. M.; Lee, W. R.; Lee, S. K.; Lee, J. S.; Kim, T. R.; Na, B. K.; Namgung I.

    2003-01-01

    Calandria tubes and Liquid Injection Shutdown System(LISS) tubes in a Pressurized Heavy Water Reactor(PHWR) are to sag due to irradiation creep and growth during plant operation. When the sag of calandria tube becomes bigger, the calandria tube possibly comes in contact with LISS tube crossing beneath the calandria tube. The contact subsequently may cause the damage on the calandria tube resulting in unpredicted outage of the plant. It is therefore necessary to check the gap between the two tubes in order to periodically confirm no contact by using a proper measure during the plant life. An ultrasonic gap measuring probe assembly which can be inserted into two viewing ports of the calandria was developed in Korea and utilized to measure the sags of both tubes in the PHWR. It was found that the centerlines of calandria tubes and liquid injection shutdown system tubes can be precisely detected by ultrasonic wave. The gaps between two tubes were easily obtained from the relative distance of the measured centerline elevations of the tubes. Based on the irradiation creep equation and the measurement data, a computer program to calculate the sags was also developed. With the computer program, the sag at the end of plant life was predicted

  5. Trends in the capital costs of CANDU generating stations

    International Nuclear Information System (INIS)

    Yu, A.M.

    1982-09-01

    This paper consolidates the actual cost experience gained by Atomic Energy of Canada Limited, Ontario Hydro, and other Canadian electric utlities in the planning, design and construction of CANDU-PHWR (CANada Deuterium Uranium-Pressurized Heavy Water Reactor) generating stations over the past 30 years. For each of the major CANDU-PHWR generating stations in operation and under construction in Canada, an analysis is made to trace the evolution of the capital cost estimates. Major technical, economic and other parameters that affect the cost trends of CANDU-PHWR generating stations are identified and their impacts assessed. An analysis of the real cost of CANDU generating stations is made by eliminating interest during construction and escalation, and the effects of planned deferment of in-service dates. An historical trend in the increase in the real cost of CANDU power plants is established. Based on the cost experience gained in the design and construction of CANDU-PHWR units in Canada, as well as on the assessment of parameters that influence the costs of such projects, the future costs of CANDU-PHWRs are presented

  6. Growth scenarios with thorium fuel cycles in pressurised heavy water reactors

    International Nuclear Information System (INIS)

    Balakrishnan, M.R.

    1991-01-01

    Since India has generous deposits of thorium, the availability of thorium will not be a limiting factor in any growth scenario. It is fairly well accepted that the best system for utilisation of thorium is the heavy water reactor. The growth scenarios possible using thorium in HWRs are considered. The base has been taken as 50,000 tons of natural uranium and practically unlimited thorium. The reference reactor has been assumed to be the PHWR, and all other growth scenarios are compared with the growth scenario provided by the once-through natural cycle in the PHWR. Two reactor types have been considered: the heavy water moderated, heavy water cooled, pressure tube reactor, known as the PHWR; and the heavy water moderated and cooled pressure vessel kind, similar to the ATUCHA reactor in Argentina. For each reactor, a number of different fuel cycles have been studied. All these cycles have been based on thorium. These are: the self-sustaining equilibrium thorium cycle (SSET); the high conversion ratio high burnup cycle; and the once through thorium cycle (OTT). The cycle have been initiated in two ways: one is by starting the cycle with natural uranium, reprocessing the spent fuel to obtain plutonium, and use that plutonium to initiate the thorium cycle; the other is to enrich the uranium to about 2-3% U-235 (the so-called Low Enriched Uranium or LEU), and use the LEU to initiate the thorium cycle. Both cases have been studied, and growth scenarios have been projected for every one of the possible combinations. (author). 1 tab

  7. Partitioning of actinide from simulated high level wastes arising from reprocessing of PHWR fuels: counter current extraction studies using CMPO

    International Nuclear Information System (INIS)

    Deshingkar, D.S.; Chitnis, R.R.; Wattal, P.K.; Theyyunni, T.K.; Nair, M.K.T.; Ramanujam, A.; Dhami, P.S.; Gopalakrishnan, V.; Rao, M.K.; Mathur, J.N.; Murali, M.S.; Iyer, R.H.; Badheka, L.P.; Banerji, A.

    1994-01-01

    High level wastes (HLW) arising from reprocessing of pressurised heavy water reactor (PHWR) fuels contain actinides like neptunium, americium and cerium which are not extracted in the Purex process. They also contain small quantities of uranium and plutonium in addition to fission products. Removal of these actinides prior to vitrification of HLW can effectively reduce the active surveillance period of final waste form. Counter current studies using indigenously synthesised octyl (phenyl)-N, N-diisobutylcarbamoylmethylphosphine oxide (CMPO) were taken up as a follow-up of successful runs with simulated sulphate bearing low acid HLW solutions. The simulated HLW arising from reprocessing of PHWR fuel was prepared based on presumed burnup of 6500 MWd/Te of uranium, 3 years cooling period and 800 litres of waste generation per tonne of fuel reprocessed. The alpha activity of the HLW raffinate after extraction with the CMPO-TBP mixture could be brought down to near background level. (author). 13 refs., 2 tabs., 12 figs

  8. Partitioning of actinide from simulated high level wastes arising from reprocessing of PHWR fuels: counter current extraction studies using CMPO

    Energy Technology Data Exchange (ETDEWEB)

    Deshingkar, D S; Chitnis, R R; Wattal, P K; Theyyunni, T K; Nair, M K.T. [Bhabha Atomic Research Centre, Bombay (India). Process Engineering and Systems Development Div.; Ramanujam, A; Dhami, P S; Gopalakrishnan, V; Rao, M K [Bhabha Atomic Research Centre, Bombay (India). Fuel Reprocessing Group; Mathur, J N; Murali, M S; Iyer, R H [Bhabha Atomic Research Centre, Bombay (India). Radiochemistry Div.; Badheka, L P; Banerji, A [Bhabha Atomic Research Centre, Bombay (India). Bio-organic Div.

    1994-12-31

    High level wastes (HLW) arising from reprocessing of pressurised heavy water reactor (PHWR) fuels contain actinides like neptunium, americium and cerium which are not extracted in the Purex process. They also contain small quantities of uranium and plutonium in addition to fission products. Removal of these actinides prior to vitrification of HLW can effectively reduce the active surveillance period of final waste form. Counter current studies using indigenously synthesised octyl (phenyl)-N, N-diisobutylcarbamoylmethylphosphine oxide (CMPO) were taken up as a follow-up of successful runs with simulated sulphate bearing low acid HLW solutions. The simulated HLW arising from reprocessing of PHWR fuel was prepared based on presumed burnup of 6500 MWd/Te of uranium, 3 years cooling period and 800 litres of waste generation per tonne of fuel reprocessed. The alpha activity of the HLW raffinate after extraction with the CMPO-TBP mixture could be brought down to near background level. (author). 13 refs., 2 tabs., 12 figs.

  9. Study to use graded cobalt adjuster in 540 MWe PHWR

    International Nuclear Information System (INIS)

    Raj, Manish; Fernando, M.P.S.; Pradhan, A.S.; Kumar, A.N.

    2007-01-01

    Full text: There are 17 adjusters in 540 MWe PHWR, which are essentially provided for xenon override function. They also provide flux flattening being in the central region of the reactor core. The present design of adjusters consists of stainless steel tube. The adjuster rods are grouped into 8 banks for movement. Since adjusters are normally fully inserted during reactor operation, they are best suited for production of cobalt 60. The nickel-plated cobalt in the form of either slugs or pellet are used for the design of cobalt pencils. The number of pencils can be varied to optimize the reactivity load and cobalt 60 production requirement. The worth and activity of cobalt adjusters have been worked out considering different pin configuration for the adjuster assembly. To start with we have assumed all adjusters throughout its length are of the same configuration. The flux depression factors within the cobalt pencils have been considered in the estimations of the specific and total cobalt 60 activities. The option of using graded cobalt adjusters, where different pin configuration along the length is considered for better flux flattening

  10. Considerations in providing purification flows for 500 MWe PHWR primary circuits

    International Nuclear Information System (INIS)

    Sharma, A.K.; Goswami, S.; Bapat, C.N.; Sharma, V.K.

    1995-01-01

    The purpose of the purification system is to keep the primary heat transport (PHT) system clean by removing traces of impurities arising due to corrosion of the carbon steel pipes and heat transfer surfaces and erosion/corrosion of valve trims, pipes and mechanical seals or due to presence of soluble or insoluble fission products. These impurities are undesirable because they are usually radioactive, either naturally or through activation by the neutron flux as they are carried by the coolant through the reactor core. The purification system minimizes the probability of generation of radioactive impurities by controlling the chemistry of PHT coolant so that corrosion is minimum. Various considerations for providing the requisite purification flow to fulfill the above functions for a typical 500 MWe PHWR are presented. (author). 4 refs., 2 tabs., 2 figs

  11. Conceptual design of a large heavy water reactor for US siting

    International Nuclear Information System (INIS)

    Shapiro, N.L.; Jesick, J.F.; Molin, A.T.; Daniel, J.A.

    1979-09-01

    Information on the PHWR type reactor is presented concerning design characteristics; fuel management and resource utilization; economic evaluations; safety, licensing, and environmental impact; and commercial introduction

  12. UO2 - Zr chemical interaction of PHWR fuel pins under high temperature

    International Nuclear Information System (INIS)

    Majumdar, P.; Mukhopadhyay, D.; Gupta, S.K.

    2001-01-01

    At high temperature Zircaloy clad interacts with the UO 2 fuel as well as with the steam to produce oxide layer of a-Zr(O) and ZrO 2 . This layer formation significantly reduces the structural strength of the clad. A computer code SFDCPA/MOD1 has been developed to simulate the interaction and predict the oxide layer thickness for any accidental transient condition. It is well validated with published experimental data on the isothermal and transient temperature condition. The program is applied to Indian Pressurized Heavy Water Reactor (PHWR) fuel pin under certain severe transient condition where it experiences temperature above 1000 C. The study gives an idea of the un-oxidized thickness of Zircaloy, which is an important criterion for fuel integrity. (author)

  13. Ontario Hydro annual report, 1988

    International Nuclear Information System (INIS)

    1989-04-01

    Ontario continues a strong growth in electricity consumption; over the past five years consumption has risen an average of 5 percent a year. In 1988 consumption rose by 6.5 percent to 133.1 billion kilowatt-hours. Peak demand was 23 million kilowatts. The top priority for the 1990s will be improving the energy efficiency of customers and the operating efficiency of the Corporation, with a target saving of 4500 megawatts through demand management and energy efficiency by the year 2000. A new environmental division has been formed, as well as a division for non-utility generation. Safety is of particular importance to the Nuclear Generating Division; in all nuclear operations, after 143 million hours worked from 1955 to 1988, there has never been a work-related fatality or a detectable injury due to radiation. The average radiation dose per worker continues to decline and is now under 10 percent of the legal dose limit. Retubing of Pickering Nuclear Generating Station unit 2 has been completed. Retubing of unit 1 is under way, and work on units 3 and 4 has been approved. Construction continues on the Darlington Nuclear Generating Station, where the first unit is expected to go into service in 1989. The Darlington Tritium Removal Facility was completed

  14. Development of inspection equipment for fuel bundles of CANDU-PHWR using R981 underwater radiation tolerant camera

    Energy Technology Data Exchange (ETDEWEB)

    Koo, Dae-Seo; Cho, Moon-Sung; Jo, Chang-Keun; Jun, Ji-Su; Jung, Jong Yeob; Park, Kwang-June; Suk, Ho-Chun

    2005-03-15

    The inspection equipment of fuel bundles was developed, which could perform visual inspection and dimensional measurement on fuel bundles of CANDU-PHWR, to evaluate, analyze the defective behavior of fuel bundles and inner surface of pressure tubes of inherent two-phase flow over 24kg/s in CANDU-6. The R981 radiation tolerant camera system with pan and tilt function was ordered and manufactured, which was waterproof, shielding radiation in underwater 10m in depth. The performance test, of the system ,due to camera-object distance was carried out in air/underwater atmosphere. The results of performance test of R981 radiation tolerant camera system are good. The inspection equipment of fuel bundles using R981 radiation tolerant camera system and underwater-radiation tolerant LVDT sensor(D5/200AW) was fabricated, which could perform visual inspection and dimensional measurement on fuel bundles of CANDU-PHWR with measurement accuracy 10{mu}m. This equipment will be utilizable integrity evaluation of fuel bundles which are irradiated in pressure tube of CANDU-PHWR.

  15. Data-driven warehouse optimization : Deploying skills of order pickers

    NARCIS (Netherlands)

    M. Matusiak (Marek); M.B.M. de Koster (René); J. Saarinen (Jari)

    2015-01-01

    textabstractBatching orders and routing order pickers is a commonly studied problem in many picker-to-parts warehouses. The impact of individual differences in picking skills on performance has received little attention. In this paper, we show that taking into account differences in the skills of

  16. Radioactive materials transportation emergency response plan

    International Nuclear Information System (INIS)

    Karmali, N.

    1987-05-01

    Ontario Hydro transports radioactive material between its nuclear facilities, Atomic Energy of Canada Limited at Chalk River Laboratories and Radiochemical Company in Kanata, on a regular basis. Ontario Hydro also occasionally transports to Whiteshell Laboratories, Hydro-Quebec and New Brunswick Electric Power Commission. Although there are stringent packaging and procedural requirements for these shipments, Ontario Hydro has developed a Radioactive Materials Transportation Emergency Response Plan in the event that there is an accident. The Transportation Emergency Response plan is based on six concepts: 1) the Province id divided into three response areas with each station (Pickering, Darlington, Bruce) having identified response areas; 2) response is activated via a toll-free number. A shift supervisor at Pickering will answer the call, determine the hazards involved from the central shipment log and provide on-line advice to the emergency worker. At the same time he will notify the nearest Ontario Hydro area office to provide initial corporate response, and will request the nearest nuclear station to provide response assistance; 3) all stations have capability in terms of trained personnel and equipment to respond to an accident; 4) all Ontario Hydro shipments are logged with Pickering NGS. Present capability is based on computerized logging with the computer located in the shift office at Pickering to allow quick access to information on the shipment; 5) there is a three tier structure for emergency public information. The local Area Manager is the first Ontario Hydro person at the scene of the accident. The responding facility technical spokesperson is the second line of Corporate presence and the Ontario Hydro Corporate spokesperson is notified in case the accident is a media event; and 6) Ontario Hydro will respond to non-Hydro shipments of radioactive materials in terms of providing assistance, guidance and capability. However, the shipper is responsible

  17. In situ sampling for pressure tube deuterium concentration

    International Nuclear Information System (INIS)

    Harrington, A.J.; Kittmer, C.A.

    1988-01-01

    The present method of assessing the useful life of pressure tubes in CANDU (CANada Deuterium Uranium) reactors requires the periodic removal and examination of a tube. Special tooling was developed at Atomic Energy of Canada Limited (AECL) to obtain a sample of material from a pressure tube without removing the tube from the reactor. The sampling tool concept has been successfully used by Ontario Hydro during scheduled outages at the Pickering Nuclear Generating Station (PNGS). (author)

  18. Women cotton pickers perceptions about health hazards due to pesticide use in irrigated punjab

    International Nuclear Information System (INIS)

    Abbas, M.; Mehmood, I.; Bashir, A.; Hassan, S.

    2015-01-01

    In Pakistan, cotton crop has special importance from the perspective of largest employment generation both for males and females in the production and value chains. Cotton picking is primarily a female specific activity in all cropping zones of Pakistan. Women cotton pickers mostly belong to poor rural society involved in this labour force to feed their families. Cotton pickers in Pakistan face some serious health related problems due to heavy use of pesticides on cotton crop. The present study was designed to investigate the problem faced by women cotton pickers and their role in household decision making. Overall 150 women cotton pickers were interviewed from Bahawalnagar, Sahiwal and Vehari districts of cotton-wheat zone of the Punjab. Summary statistics of women cotton pickers' showed mean average age was 33 years and had 2.4 ears of formal schooling and 10 years of cotton picking experience. The main reasons for cotton picking reported were to reduce family financial burden (30%) followed by better access to food and resource (23%) and better education of children (21%). Majority of the respondents (97.33%) reported that the mode of payments of cotton picking was in cash and the most of the respondents (83.70%) reported that they got wages in time. Only few respondents (8.70%) were aware of health hazards due to pesticides and only 10% women wear protective clothes during cotton picking. Majority of the respondents (76%) wash their clothes after cotton picking whereas almost all the respondents wash their hand after cotton picking. The women cotton pickers faced health problem, tiredness (54.5%), mental disturbance (9.90%) and fatigue (8.00%). More than 58% women reported their involvement in household decision making regarding food and groceries while 30.6% women involved in decision about education of children. It is suggested that the female cotton pickers should be educated about the importance (in terms of disease treatment and long-run health costs

  19. Aquatic dispersion modelling of a tritium plume in Lake Ontario

    International Nuclear Information System (INIS)

    Klukas, M.H.; Moltyaner, G.L.

    1996-05-01

    Approximately 2900 kg of tritiated water, containing 2.3E+15 Bq of tritium, were released to Lake Ontario via the cooling water discharge when a leak developed in a moderator heat exchanger in Unit 1 at the Pickering Nuclear Generating Station (PNGS) on 1992 August 2. The release provided the opportunity to study the dispersion of a tritium plume in the coastal zone of Lake Ontario. Current direction over the two-week period following the release was predominantly parallel to the shore, and elevated tritium concentrations were observed up to 20 km east and 85 km west of the PNGS. Predictions of the tritium plume movement were made using current velocity measurements taken at 8-m depth, 2.5 km offshore from Darlington and using a empirical relationship where alongshore current speed is assumed to be proportional to the alongshore component of the wind speed. The tritium migration was best described using current velocity measurements. The tritium plume dispersion is modelled using the one-dimensional advection-dispersion equation. Transport parameters are the alongshore current speed and longitudinal dispersion coefficient. Longitudinal dispersion coefficients, estimated by fitting the solution of the advection-dispersion equation to measured concentration distance profiles ranged from 3.75 to 10.57 m 2 s -1 . Simulations using the fitted values of the dispersion coefficient were able to describe maximum tritium concentrations measured at water supply plants located within 25 km of Pickering to within a factor of 3. The dispersion coefficient is a function of spatial and temporal variability in current velocity and the fitted dispersion coefficients estimated here may not be suitable for predicting tritium plume dispersion under different current conditions. The sensitivity of the dispersion coefficient to variability in current conditions should be evaluated in further field experiments. (author). 13 refs., 7 tabs., 12 figs

  20. Eddy current magnetic bias x-probe qualification and inspection of steam generator Monel 400 tubing in Pickering Nuclear Generating Station

    International Nuclear Information System (INIS)

    Lepine, B.A.; Van Langen, J.; Obrutsky, L.

    2006-01-01

    This paper presents an overview of the x-probe MB 350 eddy current inspection array probe, for detection of open OD axial crack-like flaws in Monel 400 tubes at Pickering Nuclear Generating Station. This report contains a selection of inspection results from the field inspections performed with this probe during the 2003 and 2004 period at Pickering Nuclear Generating Station A and B. During the 2003 in-service eddy current inspection results of Pickering Nuclear Generating Station A (PNGS-A) Unit 2, a 13 mm (0.5 inch) long axial indication was detected by the CTR1 bobbin and CTR2-C4 array probes in Tube R25-C52 of Steam Generator (SG) 11 in the hot leg sludge pile region. An experimental magnetic bias X-probe, specially designed by Zetec for inspection of Monel 400 tubing, was deployed and the indication was characterized as a potential out diameter (OD) axially oriented crack. Post-inspection tube pulling and destructive examination confirmed the presence of an Environmentally Assisted Crack (EAC), approximately 80% deep and 13mm long. Due to the significance of this discovery, Ontario Power Generation (OPG) requested AECL to initiate a program for qualification of the X-probe MB 350 for the detection of OD axial cracks in medium to high magnetic permeability μ r Monel 400 PNGS-A and B steam generator tubing at different locations. The X-probe MB 350 subsequently has been deployed as a primary inspection probe for crack detection for PNGS steam generators. (author)

  1. From pioneering to implementing automated blood pressure measurement in clinical practice: Thomas Pickering's legacy

    DEFF Research Database (Denmark)

    Stolarz-Skrzypek, Katarzyna; Thijs, Lutgarde; Wizner, Barbara

    2010-01-01

    Thomas G. Pickering spent most of his scientific career in carrying out research on clinical hypertension and blood pressure (BP) measurement. In our review of Pickering's seminal work, we first focused on white-coat hypertension and masked hypertension, two terms that he had introduced. Next, we...... highlighted the early publications of Pickering on diurnal BP variability and on the clinical application of self-measured BP. Pickering's work inspired many investigators worldwide and constituted a solid basis for further research. Pickering's original ideas led to algorithms for risk stratification...

  2. The Ontario hydro low pressure turbine disc inspection program automated ultrasonic inspection systems - an overview

    International Nuclear Information System (INIS)

    Huggins, J.W.; Chopcian, M.; Grabish, M.

    1990-01-01

    An overview of the Ontario Hydro Low Pressure Turbine Disc Inspection Program is presented. The ultrasonic inspection systems developed in-house to inspect low pressure turbine discs at Pickering and Bruce Nuclear Generating stations are described. Three aspects of the program are covered: PART I - Background to inspection program, disc cracking experience, and development of an in-house inspection capability: PART II - System development requirements; ultrasonic equipment, electromechanical subsystems and instrumentation console: PART III - Customized software for flaw detection, sizing, data acquisition/storage, advanced signal processing, reports, documentation and software based diagnostics

  3. Assessment of clad integrity of PHWR fuel pin following a postulated severe accident

    International Nuclear Information System (INIS)

    Dutta, B.K.; Kushwaha, H.S.; Venkat Raj, V.

    2000-01-01

    A mechanistic fuel performance analysis code FAIR has been developed. The code can analyse fuel pins with free standing as well as collapsible clad under normal, off-normal and accident conditions of reactors. The code FAIR is capable of analysing the effects of high burnup on fuel behaviour. The code incorporates finite element based thermo-mechanical module for computing transient temperature distribution and thermal-elastic-plastic stresses in the fuel pin. A number of high temperature thermo-physical and thermo-mechanical models also have been incorporated for analysing fuel pins subjected to severe accident scenario. The present paper describes salient features of code FAIR and assessment of clad integrity of PHWR fuel pins with different initial burnup subjected to severe accident scenario. (author)

  4. CLUB - a multigroup integral transport theory code for lattice calculations of PHWR cells

    International Nuclear Information System (INIS)

    Krishnani, P.D.

    1992-01-01

    The computer code CLUB has been developed to calculate lattice parameters as a function of burnup for a pressurised heavy water reactor (PHWR) lattice cell containing fuel in the form of cluster. It solves the multigroup integral transport equation by the method based on combination of small scale collision probability (CP) method and large scale interface current technique. The calculations are performed by using WIMS 69 group cross section library or its condensed versions of 27 or 28 group libraries. It can also compute Keff from the given geometrical buckling in the input using multigroup diffusion theory in fundamental mode. The first order differential burnup equations can be solved by either Trapezoidal rule or Runge-Kutta method. (author). 17 refs., 2 figs

  5. Phytotoxicology section investigation in the vicinity of the Bruce Nuclear Power Development, the Pickering Nuclear Generating Station and the Darlington Nuclear Generating Station, in October, 1989

    International Nuclear Information System (INIS)

    1991-02-01

    The Phytotoxicology Section, Air Resources Branch is a participant in the Pickering and Bruce Nuclear Contingency Plans. The Phytotoxicology Emergency Response Team is responsible for collecting vegetation samples in the event of a nuclear emergency at any of the nuclear generating stations in the province. As part of its responsibility the Phytotoxicology Section collects samples around the nuclear generating stations for comparison purposes in the event of an emergency. Because of the limited frequency of sampling, the data from the surveys are not intended to be used as part of a regulatory monitoring program. These data represent an effort by the MOE to begin to establish a data base of tritium concentrations in vegetation. The Phytotoxicology Section has carried out seven surveys in the vicinity of Ontario Hydro nuclear generating stations since 1981. Surveys were conducted for tritium in snow in the vicinity of Bruce Nuclear Power Development (BNPD), February, 1981; tritium in cell-free water of white ash in the vicinity of BNPD, September, 1981; tritium in snow in the vicinity of BNPD, March, 1982; tritium in tree sap in the vicinity of BNPD, April, 1982; tritium in tree sap in the vicinity of BNPD, April, 1984, tritium in the cell-free water of white ash in the vicinity of BNPD, September, 1985; and, tritium in cell-free water of grass in the vicinity of Pickering Nuclear Generation Station (PNGS), October 1986. In all cases a pattern of decreasing tritium levels with increasing distance from the stations was observed. In October, 1989, assessment surveys were conducted around Bruce Nuclear Power Development, the Pickering Nuclear Generating Station and the new Darlington Nuclear Generating Station (DNGS). The purpose of these surveys was to provide baseline data for tritium in cell-free water of grass at all three locations at the same time of year. As none of the reactor units at DNGS had been brought on line at the time of the survey, this data was to be

  6. The safety of Ontario's nuclear power reactors. A scientific and technical review. Selected consultants' reports

    International Nuclear Information System (INIS)

    Hare, F.K.

    1988-01-01

    The Review commissioned 31 consultants to prepare detailed analyses of specific safety-related questions raised by the design and operation of Ontario Hydro's CANDU reactors. This volume presents 10 of these reports, which I judge to be of sufficient general importance to justify the cost of wide circulation. They have been reproduced precisely as they were submitted. They do not express the Review's own judgements, but do contain a major part of the evidence that influenced those judgements. In several cases the consultants have presented formal recommendations. Some of these have been incorporated, often in modified form, as Review recommendations, in the Minister's Report. Others remain simply as recommendations from the individual consultants. I agree with most of them, but have not seen them as central to the Review's conclusions. I suggest that appropriate institutions--most notably Ontario Hydro and Atomic Energy Control Board--study them, and act as they see fit

  7. Pickering safeguards: a preliminary analysis

    International Nuclear Information System (INIS)

    Todd, J.L.; Hodgkinson, J.G.

    1977-05-01

    A summary is presented of thoughts relative to a systems approach for implementing international safeguards. Included is a preliminary analysis of the Pickering Generating Station followed by a suggested safeguards system for the facility

  8. Steam generator life cycle management: Ontario Power Generation (OPG) experience

    International Nuclear Information System (INIS)

    Maruska, C.C.

    2002-01-01

    A systematic managed process for steam generators has been implemented at Ontario Power Generation (OPG) nuclear stations for the past several years. One of the key requirements of this managed process is to have in place long range Steam Generator Life Cycle Management (SG LCM) plans for each unit. The primary goal of these plans is to maximize the value of the nuclear facility through safe and reliable steam generator operation over the expected life of the units. The SG LCM plans integrate and schedule all steam generator actions such as inspection, operation, maintenance, modifications, repairs, assessments, R and D, performance monitoring and feedback. This paper discusses OPG steam generator life cycle management experience to date, including successes, failures and how lessons learned have been re-applied. The discussion includes relevant examples from each of the operating stations: Pickering B and Darlington. It also includes some of the experience and lessons learned from the activities carried out to refurbish the steam generators at Pickering A after several years in long term lay-up. The paper is structured along the various degradation modes that have been observed to date at these sites, including monitoring and mitigating actions taken and future plans. (author)

  9. New avenues in cobalt-60 production at Ontario Hydro

    International Nuclear Information System (INIS)

    Mylvaganam, C.K.; Ronchka, R.A.

    1990-01-01

    Ontario Hydro produces cobalt-60 in the control rods of twelve power reactors. These reactors have a typical flux of 2 x 10 14 neutrons/cm 2 /s, making them efficient producers of cobalt-60. Current annual production is 45 million curies. Since the primary function of these reactors is the production of electricity, their flexibility to meet the needs of commercial cobalt production by the control rod route is limited. Ontario Hydro is therefore developing innovative production techniques, making use of the CANDU reactor's unique ability to be fuelled on-power. These techniques will enable production to better respond to the market's requirements for quantity and specific activity. As it is supplementary to control rod production, annual supply could potentially reach 165 million curies. (author)

  10. PROFILE OF PLASTIC WATER BOTTLES WASTES PROCESSING BUSINESS UNIT FOR WASTE PICKERS

    Directory of Open Access Journals (Sweden)

    Herijanto P.

    2017-09-01

    Full Text Available Used plastic water bottles waste pickers can be categorized as one of the informal sector’s component. They work for themselves by picking up used water bottles and selling them to the waste collectors. The problem to be solved in this research is How the Most Appropriate Used Plastic Water Bottles Business Model for Waste Pickers Is that enables them to be categorized as formal sector. From the result of the interview with 120 waste pickers, 96 results were qualified to be analyzed. The interview was located in several waste collectors, which were visited by waste pickers at certain hours. The data were analyzed descriptively based on six business aspects. Specifically for production facilities, Quality Function Deployment (QFD and Value Engineering (VE analysis were performed. The results of the analysis indicate that the business is practicable for waste pickers and has the potential to enable them run a formal business sector.

  11. Delayed hydride cracking behavior of Zr-2.5Nb alloy pressure tubes for PHWR700

    Energy Technology Data Exchange (ETDEWEB)

    Sunil, S.; Bind, A.K.; Khandelwal, H.K.; Singh, R.N., E-mail: rnsingh@barc.gov.in; Chakravartty, J.K.

    2015-11-15

    In order to attain improved in-reactor performance few prototypes pressure tubes of Zr-2.5Nb alloy were manufactured by employing forging to break the cast structure and to obtain more homogeneous microstructure. Both double forging and single forging were employed. The forged material was further processed by employing hot extrusion, cold pilgering and autoclaving. A detailed characterization in terms of mechanical properties and microstructure of the prototype tubes were carried for qualifying it for intended use as pressure tubes in PHWR700 reactors. In this work, Delayed Hydride Cracking (DHC) behavior of the forged Zr-2.5Nb pressure tube material characterized in terms of DHC velocity and threshold stress intensity factor associated with DHC (K{sub IH}) was compared with that of conventionally manufactured material in the temperature range of 200–283 °C. Activation energy associated with the DHC in this alloy was found to be ∼60 kJ/mol for the forged materials.

  12. A series of lectures on operational physics of power reactors

    International Nuclear Information System (INIS)

    Mohanakrishnan, P.; Rastogi, B.P.

    1982-01-01

    This report discusses certain aspects of operational physics of power reactors. These form a lecture series at the Winter College on Nuclear Physics and Reactors, Jan. - March 1980, conducted at the International Centre for Theoretical Physics, Trieste, Italy. The topics covered are (a) the reactor physics aspects of fuel burnup (b) theoretical methods applied for burnup prediction in power reactors (c) interpretation of neutron detector readings in terms of adjacent fuel assembly powers (d) refuelling schemes used in power reactors. The reactor types chosen for the discussion are BWR, PWR and PHWR. (author)

  13. Studies on water quality parameters due to operation of PHWR at KAPS

    International Nuclear Information System (INIS)

    Jha, Mukesh; John, Jaison T.; Joshi, C.P.; Vyas, P.V.; Hegde, A.G.

    2005-01-01

    The paper elucidates the effect of water quality due to operation of Pressurised Heavy Water Reactor located at Kakrapar as water is the essential commodity for all living beings. It is the main concern in recent times for environmental protection, there is a pressure on all type of industries including nuclear power stations to discharge various types of effluents in such a manner that pollution in surrounding environment is kept to the minimum. Owing the wastewater discharge modes of Kakrapar atomic power station behavior of effluents resulting impact on environment and general public will be guided by the water quality of the aquatic system. To ensure the quality of water, the study of water quality parameters are taken up and the investigated parameters showed no degradation in ecosystem due to the operation of PHWR at KAPS. (author)

  14. Neutron radiography of irradiated zircaloy coupons of pressure tubes from PHWR`s

    Energy Technology Data Exchange (ETDEWEB)

    Gangotra, S; Ouseph, P M; Tamhane, A B; Singh, H N; Sahoo, K C [Bhabha Atomic Research Centre, Bombay (India). Radiometallurgy Div.

    1994-12-31

    The Indian Pressurised Heavy Water Reactors (PHWR`s) are of CANDU type, consisting of 304 zircaloy-2 pressure tubes. These pressure tubes contain the fuel bundles, where the heat is generated and is removed by the heavy water flowing through these pressure tubes at high temperature and pressure. These pressure tubes are surrounded by the calandria tubes, and are separated from them by a pair of garter springs. Over a period of time, as a result of the irradiation creep and assisted by the displacement of the garter springs, the hot pressure tube may come in contact with the cold calandria tube. This would result in the hydrogen migrating to the cold contact location and formation of hydride blisters. These blisters could eventually rupture the pressure tube by the DHC (delayed hydrogen cracking) mechanism. 2 refs., 2 figs.

  15. Highlights of the metallurgical behaviour of CANDU pressure tubes

    International Nuclear Information System (INIS)

    Price, E.G.

    1984-10-01

    This paper is an overview of the service induced metallurgical changes that take place in Zircaloy-2 and Zr-2.5 wt. percent Nb pressure tubes in CANDU reactors. It incorporates the findings of an evaluation program, that followed a significant pressure tube failure at Ontario Hydro's Pickering Nuclear Generating Station, and also provides valid reasons for continued confidence in the current CANDU design

  16. Annual report, 1978

    International Nuclear Information System (INIS)

    1979-04-01

    In 1978, for the first time, nuclear generators supplied more electricity than coal-fired units: 30 percent of the total compared with 28 percent for coal. Energy demand in Ontario was up by 2.7 percent. No new commitments for generating stations were made, and work on committed stations was to be slowed until the generation expansion program had been fully reviewed. Atomic Energy of Canada Ltd. and Ontario Hydro have agreed to develop a nuclear wastes demonstration facility. The Select Committee of the Ontario Legislature on Ontario Hydro affairs investigated the costs of the Bruce heavy water plants and found no evidence of mismanagement. The Royal Commission on Electric Power Planning issued an interim report on nuclear power which recognized the need for and safety of the CANDU system. Reactors at Pickering and Bruce achieved an overall capacity factor of 81 percent. The third Bruce A unit was started up. Work on Bruce B and Pickering B was well underway. Bruce Heavy Water Plant B was virtually complete, but work was stopped on the second half of the Bruce D plant. Plans for the first half of Bruce D will be reviewed. Site preparation and excavation continued for the Darlington generating station. (LL)

  17. Water-in-oil Pickering emulsions stabilized by stearoylated microcrystalline cellulose.

    Science.gov (United States)

    Pang, Bo; Liu, Huan; Liu, Peiwen; Peng, Xinwen; Zhang, Kai

    2018-03-01

    Hydrophobic particles with static water contact angles larger than 90° are more like to stabilize W/O Pickering emulsions. In particular, high internal phase Pickering emulsions (HIPEs) are of great interest for diverse applications. However, W/O HIPEs have rarely been realized using sustainable biopolymers. Herein, we used stearoylated microcrystalline cellulose (SMCC) to stabilize W/O Pickering emulsions and especially, W/O HIPEs. Moreover, these W/O HIPEs can be further used as platforms for the preparation of porous materials, such as porous foams. Stearoylated microcrystalline cellulose (SMCC) was prepared by modifying MCC with stearoyl chloride under heterogeneous conditions. Using SMCC as emulsifiers, W/O medium and high internal phase Pickering emulsions (MIPEs and HIPEs) with various organic solvents as continuous phases were prepared using one-step and two-step methods, respectively. Polystyrene (PS) foams were prepared after polymerization of oil phase using HIPEs as templates and their oil/water separation capacity were studied. SMCC could efficiently stabilize W/O Pickering emulsions and HIPEs could only be prepared via the two-step method. The internal phase volume fraction of the SMCC-stabilized HIPEs reached as high as 89%. Diverse internal phase volume fractions led to distinct inner structures of foams with closed or open cells. These macroporous polystyrene (PS) foams demonstrated great potential for the effective absorption of organic solvents from underwater. Copyright © 2017 Elsevier Inc. All rights reserved.

  18. Pickering seismic safety margin

    International Nuclear Information System (INIS)

    Ghobarah, A.; Heidebrecht, A.C.; Tso, W.K.

    1992-06-01

    A study was conducted to recommend a methodology for the seismic safety margin review of existing Canadian CANDU nuclear generating stations such as Pickering A. The purpose of the seismic safety margin review is to determine whether the nuclear plant has sufficient seismic safety margin over its design basis to assure plant safety. In this review process, it is possible to identify the weak links which might limit the seismic performance of critical structures, systems and components. The proposed methodology is a modification the EPRI (Electric Power Research Institute) approach. The methodology includes: the characterization of the site margin earthquake, the definition of the performance criteria for the elements of a success path, and the determination of the seismic withstand capacity. It is proposed that the margin earthquake be established on the basis of using historical records and the regional seismo-tectonic and site specific evaluations. The ability of the components and systems to withstand the margin earthquake is determined by database comparisons, inspection, analysis or testing. An implementation plan for the application of the methodology to the Pickering A NGS is prepared

  19. Design and installation of a strategically placed algae mesh barrier at OPG Pickering Nuclear Generating Station

    International Nuclear Information System (INIS)

    Marttila, D.; Patrick, P.; Gregoris, C.

    2009-01-01

    Ontario Power Generation's Pickering Nuclear has experienced a number of events in which attached algae have become entrained in the water intake costing approximately $30M over the 1995-2005 period as a result of deratings, Unit shutdowns and other operational issues. In 2005-2006 OPG and Kinectrics worked collaboratively on evaluating different potential solutions to reduce the impact of algae on the station. One of the solutions developed by Kinectrics included a strategically placed barrier net designed to regulate algae flow into the station intake. In 2006, Kinectrics designed and installed the system, the first of its kind at a Nuclear Power Plant in Canada. The system was operational by May 2007. OPG completed an effectiveness study in 2007 and concluded the barrier system had a beneficial effect on reducing algae impact on the station. (author)

  20. Ontario Hydro nuclear - challenges of the future

    International Nuclear Information System (INIS)

    Field, R.

    1996-01-01

    The challenges facing Ontario Hydro Nuclear (OHN), as understood at the time of the conference, are discussed. OHN had many strengths to build on in preparing for the competition ahead, including: extremely competitive production costs, strong technical capabilities, advantages of multiple units, environmental advantages favoring nuclear, strong public support, and improving station performance. Even with these advantages, OHN faced the difficult challenge of improving overall performance in the face of a large debt burden, coupled with the reinvestment demands of aging units at Pickering A and Bruce A. At the time of the conference, Bruce 2 had already been shut down, because the cost of retubing it and replacing its boilers could not be justified. The ''drive to nuclear excellence'' involves the simultaneous achievement of top performance in safety, reliability and cost; and to this end, changes were being made to reverse the trends indicated by disappointing ''peer reviews''

  1. Measurement and analysis of pressure tube elongation in the Douglas Point reactor

    International Nuclear Information System (INIS)

    Causey, A.R.; MacEwan, S.R.; Jamieson, H.C.; Mitchell, A.B.

    1980-02-01

    Elongations of zirconium alloy pressure tubes in CANDU reactors, which occur as a result of neutron-irradiation-induced creep and growth, have been measured over the past 6 years, and the consequences of thses elongations have recently been analysed. Elongation rates, previously deduced from extensive measurements of elongations of cold-worked Zircaloy-2 pressure tubes in the Pickering reactors, have been modified to apply to the pressure tubes in the Douglas Point (DP) reactor by taking into account measured diffences in texture and dislocation density. Using these elongation rates, and structural data unique to the DP reactor, the analysis predicts elongation behaviour which is in good agreement with pressure tube elongations measured during the ten years of reactor operation. (Auth)

  2. Evaluation of organic coatings to reduce air leakage through cracks in the Pickering NGS 'A' reactor building 1

    International Nuclear Information System (INIS)

    Deans, J.J.; Sato, J.A.; Hampton, J.H.D.; Cullen, R.; Paterson, G.; Chan, P.; Rajagopalan, R.

    1994-01-01

    Pressure tests conducted in 1992 on the Pickering NGS 'A' Reactor Building 1 showed that the containment leakage rate of the building was close to the licensing limit. The leakage was found to be pressure dependent and was attributed to cracks in the concrete dome. A number of solutions were studied by a task group, and the application of an organic coating to the exterior surface of the dome was identified as the most viable solution under the constraints of schedule and cost. In addition to reducing the air leakage rate, the coating material must be flexible to bridge existing moving cracks, it must have excellent adhesion to the concrete substrate to sustain the design pressure of 41.4 kPa(g) during pressure tests, and it must be durable for an exterior application and service conditions. Five candidate organic coating materials were selected for laboratory testing. As a result of the testing, a single-component elastomeric polyurethane coating was selected to be used on the dome. This paper discusses the selection process, laboratory tests and results, and the application of the polyurethane coating system to the exterior concrete dome surface. However, the main emphasis of the paper is on the laboratory evaluation of the five candidate materials. (author). 2 refs., 3 tabs., 1 fig

  3. Modeling of PHWR fuel elements using FUDA code

    International Nuclear Information System (INIS)

    Tripathi, Rahul Mani; Soni, Rakesh; Prasad, P.N.; Pandarinathan, P.R.

    2008-01-01

    The computer code FUDA (Fuel Design Analysis) is used for modeling PHWR fuel bundle operation history and carry out fuel element thermo-mechanical analysis. The radial temperature profile across fuel and sheath, fission gas release, internal gas pressure, sheath stress and strains during the life of fuel bundle are estimated

  4. Edible foam based on Pickering effect of probiotic bacteria and milk proteins

    DEFF Research Database (Denmark)

    Yücel, Cigdem; Geng, Xiaolu; Cárdenas, Marité

    2017-01-01

    We report the preparation and characterization of aqueous Pickering foams using bio-particles constituted by lactic acid bacteria surface modified by oppositely charged milk proteins. Cell surface modification was shown by zeta potential measurements. Foams stabilized by bacterial Pickering bio-p...

  5. Indian experience with radionuclide transport, deposition and decontamination in water-cooled nuclear power reactors

    International Nuclear Information System (INIS)

    Narasimhan, S.V.; Das, P.C.; Lawrence, D.A.; Mathur, P.K.; Venkateswarlu, K.S.

    1983-01-01

    The present generation of water-cooled nuclear reactors uses construction materials chosen with utmost care so that minimum corrosion occurs during the life of the reactor. As interaction between the primary coolant and the construction materials is unavoidable, the coolant is chemically treated to achieve maximum compatibility. First measurements of the chemical and radiochemical composition of the crud present on the in-core and out-of-core primary heat transport system surfaces of a pressurized heavy-water-moderated and cooled reactor (PHWR) are given; then experience in India in the development of a low temperature, one-stage decontaminating formulation for chemical decontamination of the radioactive deposits formed on stainless steel surfaces under BWR conditions is discussed. The effect of the magnitude of the transients in parameters such as reactor power, system temperature, dissolved oxygen content in the coolant, etc. on the nature and migration behaviour of primary heat transport system crud in a PHWR is described. Contributions to radioactive sources and insoluble crud from different primary heat transport system materials are identified and correlated with reactor operations in a PHWR. Man-rem problems faced by nuclear reactors, especially during off-line maintenance, stress the need for reducing the deposited radioactive sources from system surfaces which would otherwise be accessible. Laboratory and on-site experimentation was carried out to effect chemical decontamination on the radioactive deposits formed on the stainless steel surfaces under BWR conditions. Both the reducing and oxidizing formulations were subsequently used in a small-scale, in-plant trial in the clean-up system of a BWR. More than 85% of the deposited 60 Co activity was found to have been removed by the oxidizing formulation. Efforts to develop a decontaminating mixture containing a reducing agent with the help of a circulating loop are in progress in the laboratory. (author)

  6. Market surveillance in Ontario

    International Nuclear Information System (INIS)

    Chandler, H.

    2002-01-01

    On May 1, 2002 both wholesale and retail electricity markets in Ontario were opened to competition. Wholesale electricity market sales of 150 TWh were valued at over $11 billion with 27,500 MW in service installed capacity and 4,000 to 6,000 MW import/export capability with strong interconnections to the Quebec, the Midwest and the Northeast. The key players in Ontario's electricity market are the Ontario Energy Board (OEB), the Independent Electricity Market Operator (IMO), Ontario Power Generation, and Hydro One. The OEB regulatory framework includes licensing and front line, daily monitoring of whole sale market. Serious capacity problems in Ontario have manifested themselves in tight supply and demand situations and highly volatile prices. The paper included graphs of available reserves for 1996 to 2002, HOEP trends and frequency, HOEP comparison, and a sensitivity to demand forecast. 1 tab., 6 figs

  7. Korean experience in CANDU-PHWR operation

    International Nuclear Information System (INIS)

    Sang-kee Park

    1987-01-01

    Among KEPCO's 9 nuclear power units, Korea Nuclear Unit No. 3, the Wolsung Nuclear Power Plant is the only CANDU-PHWR Unit, while the rest of 8 others are PWR units. The unit was designed by Atomic Energy of Canada, Ltd(AECL) of Canada, who also perfomed overall project management for the plant construction under the provisions and arrangement of the relevant contracts. The gross electrical output of the plant is 678.7 MWe and thermal output of the reactor is 2061 MWth. While these figures lead to lower plant eficiency than LWR counterparts, unit energy cost for fuel is more favorable than LWRs because natural uranium is utilized for the fuel bundles, some of which are already being fabricated domestically. Annual capacity factors for 1983 and 1984 could have been improved, if two major planned outages for the modification works on steam generator internals and one major forced outage form the heavy water spill incident could be eliminated. The heavy water spill incident in November, 1984 brought plant staffs many lessons to learn and many things to contemplate. Unique design concepts and features such as on-power refuelling, poison prevent mode, versatile plant control system built around digital computers and power step back/set back logics may be credited for these relatively good plant performances. Human related factors such as staff's technical capabilities and strong will toward good performance were other elements which could not be overlooked

  8. Korean experience in CANDU-PHWR operation

    International Nuclear Information System (INIS)

    Park, S.K.

    1988-01-01

    Among KEPCO's 9 nuclear power units, Korea Nuclear Unit No. 3, the Wolsung Nuclear Power Plant is the only CANDU-PHWR Unit, while the rest of 8 others are PWR units. The unit was designed by Atomic Energy of Canada, Ltd. of Canada, who also performed overall project management for the plant construction under the provisions and arrangement of the relevant contracts. The gross electrical output of the plant is 678.7 MWe and thermal output of the reactor is 2061 MWth. While these figures lead to lower plant efficiency than LWR counterparts, unit energy cost for fuel is more favorable than LWRs because natural uranium is utilized for the fuel bundles, some of which are already being fabricated domestically. Annual capacity factors for 1983 and 1984 could have been improved, if two major planned outages for the modification works on steam generator internals and one major forced outage from the heavy water spill incident could be eliminated. The heavy water spill incident in November, 1984 brought plant staffs many lessons to learn and many things to contemplate. Unique design concepts and features such as on-power refuelling, poison prevent mode, versatile plant control system built around digital computers and power step back/set back logics may be credited for these relatively good plant performances. Human related factors such as staff's technical capabilities and strong will toward good performance were other elements which could not be overlooked

  9. Superhydrophobic cellulose-based bionanocomposite films from Pickering emulsions

    Science.gov (United States)

    Bayer, Ilker S.; Steele, Adam; Martorana, Philip J.; Loth, Eric; Miller, Lance

    2009-04-01

    Inherently superhydrophobic and flexible cellulose-based bionanocomposites were fabricated from solid stabilized (Pickering) emulsions. Emulsions were formed by dispersing cyclosiloxanes in water stabilized by layered silicate particles and were subsequently modified by blending into a zinc oxide nanofluid. The polymer matrix was a blend of cellulose nitrate and fluoroacrylic polymer (Zonyl 8740) precompatibilized in solution. Coatings were spray cast onto aluminum substrates from polymer blends dispersed in modified Pickering emulsions. No postsurface treatment was required to induce superhydrophobicity. Effect of antiseptic additives on bionanocomposite superhydrophobicity is also discussed. Replacing cellulose nitrate with commercial liquid bandage solutions produced identical superhydrophobic coatings.

  10. Thorium utilisation in thermal reactors

    International Nuclear Information System (INIS)

    Balakrishnan, K.

    1997-01-01

    It is now more or less accepted that the best way to use thorium is in thermal reactors. This is due to the fact that U233 is a good material in the thermal spectrum. Studies of different thorium cycles in various reactor concepts had been carried out in the early days of nuclear power. After three decades of neglect, the world is once again looking at thorium with some interest. We in India have been studying thorium cycles in most of the existing thermal reactor concepts, with greater emphasis on heavy water reactors. In this paper, we report some of the work done in India on different thorium cycles in the Indian pressurized heavy water reactor (PHWR), and also give a description of the design of the advanced heavy water reactor (AHWR). (author). 1 ref., 2 tabs., 5 figs

  11. Impacting effects of seismic loading in feeder pipes of PHWR power plants

    International Nuclear Information System (INIS)

    Kumar, R.

    1996-01-01

    The core of a pressurized heavy water reactor (PHWR) consists of a large number of fuel channels. These fuel channels are connected to the feeder pipes through which the heavy water flows and transports heat from the reactor core to the steam generators. The feeder pipes are several hundreds in number. They run close to each other with small gaps and have several bends. Thus they represent a complex piping system. Under seismic loading, the adjacent feeder pipes may impact each other. In this paper a simplified procedure has been established to assess such impacting effects. The results of the proposed analysis include bending moment and impact force, which provide the stresses due to impacting effects. These results are plotted in nondimensional form so that they could be utilized for any set of feeder pipes. The procedure used for studying the impacting effects includes seismic analysis of individual feeder pipes without impacting effects, selection of pipes for impact analysis, and estimating their maximum impact velocity. Based on the static and dynamic characteristics of the selected feeder pipes, the maximum bending moment, impact force, and stresses are obtained. The results of this study are useful for quick evaluation of the impacting effects in feeder pipes

  12. Licensing assessment of the CANDU pressurized heavy water reactor. Volume I. Preliminary safety information document

    International Nuclear Information System (INIS)

    1977-06-01

    The PHWR design contains certain features that will require significant modifications to comply with USNRC siting and safety requirements. The most significant of these features are the reactor vessel; control systems; quality assurance program requirements; seismic design of structures, systems and components; and providing an inservice inspection program capability. None of these areas appear insolvable with current state-of-the-art engineering or with upgrading of the quality assurance program for components constructed outside of the USA. In order to be licensed in the U. S., the entire reactor assembly would have to be redesigned to comply with ASME Boiler and Pressure Vessel Code, Section III, Division 1 and Division 2. A summary matrix at the end of this volume identifies compliance of the systems and structures of the PHWR plant with the USNRC General Design Criteria. The matrix further identifies the estimated incremental cost to a 600 MWe PHWR that would be required to license the plant in the U. S. Further, the matrix identifies whether or not the incremental licensing cost is size dependent and the relative percentage of the base direct cost of a Canadian sited plant

  13. New experience on construction and installation work in Qinshan PHWR nuclear power plant

    International Nuclear Information System (INIS)

    Lu Huaxiang

    2004-01-01

    The article provides a summary of the new experience on construction management and construction technology in the field of civil construction and installation work in Qinshan PHWR nuclear power plant, with focus on innovation in project management mode, new technology application and computerized management of construction and installation work. Management innovation, technical innovation and information technology are the key contributors to overall success of Qinshan PHWR nuclear power plant in construction and installation work. The new experience derived in these fields will be of great significance to promote independent construction of the new-round nuclear power projects in China. (author)

  14. Noise analysis based validation of the dynamics of in-core flux detectors and ion chambers used in SDS and RRS systems

    International Nuclear Information System (INIS)

    Gloeckler, O.; Cooke, D.; Tulett, M.V.

    1996-01-01

    The paper concentrates on some of the recent applications of reactor noise analysis in Ontario Hydro's CANDU stations, related to the dynamics of in-core flux detectors (ICFDs) and ion chambers. These applications include (1) detecting anomalies in the dynamics of ICFDs and ion chambers, (2) estimating the effective prompt fractions of ICFDs in power rundown tests and in noise measurement, (3) detecting the mechanical vibration of ICFD instrument tubes induced by moderator flow, (4) detecting the mechanical vibration of fuel channels induced by coolant flow, (5) identifying the cause of excessive signal fluctuations in certain flux detectors, (6) validating the dynamic coupling between liquid zone control signals. Some of these applications are performed on a regular basis. The noise analysis program, in the Pickering-B station alone, has saved Ontario Hydro millions of dollars during its first three years. The results of the noise analysis program have been also reviewed by the AECB with favorable results. The AECB have expressed interest in Ontario Hydro further exploiting the use of noise analysis technology (author)

  15. Aspects on thorium utilization in heavy water reactors

    International Nuclear Information System (INIS)

    1978-11-01

    Some of the main problems of the Th - PHWR cycles are analyzed. With respect to the burnup limitations introduced by SSET cycle conditions and the burnup sensitivities of this reference cycle, estimates are presented using an integrated neutron-heavy element balance method. A PHWR of 1 GW(e) very similar to the CANDU current design was selected. In the case of 0.5% uranium losses, 11000 MWD/tHE and 13000 MWD/tHE were considered for U-235, respectively, for the Pu initialization of the cycle, the corresponding inventory being 4 t U-235/GW(e) and 5 t Pu (with 72% fissile content) per GW(e) for one year delay time between reactor out to reactor in, 66% capacity factor, 27 MW (fission)/tHE medium specific power. The following aspects are also analyzed: Safety problems associated with low delayed neutron fraction values; High and intermediate burnup fuel elements conceptual problems; Specific problems of thorium reprocessing; Specific problems for radioactive wastes and thorium storage; U-232 content evaluations and related fuel fabrication problems

  16. Ergonomic Evaluation of Battery Powered Portable Cotton Picker

    Science.gov (United States)

    Dixit, A.; Manes, G. S.; Singh, A.; Prakash, A.; Mahal, J. S.

    2012-09-01

    Ergonomic evaluation of battery powered portable manual cotton picker was carried out on two subjects for three cotton varieties and was compared against manual method of picking. It is a hand operated machine and has a pair of chain with small sharp edged teeth and sprockets and is operated by a light weight 12 V battery. Cotton gets entangled with the chain and is collected and guided into the collection bag. Average heart rate, oxygen consumption, workload, energy expenditure was more in case of cotton picking by manual cotton picker as compared to manual picking for both the subjects for all three cotton variety types. Oxygen consumption varied from 0.81 to 0.97 l/min, workload varied from 36.32 to 46.16 W and energy expenditure varied from 16.83 to 20.33 kJ/min for both the subject in case of machine picking for all three cotton varieties. The maximum discomfort experienced by the subjects during picking cotton by manual cotton picker was in right wrist palm, right forearm, upper and lower back, left shoulder and in lower legs and both feet.

  17. Flux distribution measurements in the Bruce B Unit 6 reactor using a transportable traveling flux detector system

    International Nuclear Information System (INIS)

    Leung, T.C.; Drewell, N.H.; Hall, D.S.; Lopez, A.M.

    1987-01-01

    A transportable traveling flux detector (TFD) system for use in power reactors has been developed and tested at Chalk River Nuclear Labs. in Canada. It consists of a miniature fission chamber, a motor drive mechanism, a computerized control unit, and a data acquisition subsystem. The TFD system was initially designed for the in situ calibration of fixed self-powered detectors in operating power reactors and for flux measurements to verify reactor physics calculations. However, this system can also be used as a general diagnostic tool for the investigation of apparent detector failures and flux anomalies and to determine the movement of reactor internal components. This paper describes the first successful use of the computerized TFD system in an operating Canada deuterium uranium (CANDU) power reactor and the results obtained from the flux distribution measurements. An attempt is made to correlate minima in the flux profile with the locations of fuel channels so that future measurements can be used to determine the sag of the channels. Twenty-seven in-core flux detector assemblies in the 855-MW (electric) Unit 6 reactor of the Ontario Hydro Bruce B Generating Station were scanned

  18. Ontario Hydro looks at security

    International Nuclear Information System (INIS)

    Green, B.J.; Kee, B.

    1995-01-01

    Ontario Hydro operates 20 CANDU reactors on three different sites. Since 1984, a review of security arrangements on all the sites has taken place on a five-yearly basis. The review process for 1995 is outlined. The three objectives were as follows: to assess current security threats and risks to the stations; to assess the adequacy of the existing programme to protect against current threats; by comparing the security programme against those of comparable entities to establish benchmarks for good practice as a basis for improvements at Ontario Hydro. Valuable insights gained through the review are listed. These could be useful to other utilities. (UK)

  19. Wet steam turbines for CANDU-Reactors

    International Nuclear Information System (INIS)

    Westmacott, C.H.L.

    1977-01-01

    The technical characteristics of 4 wet steam turbine aggregates used in the Pickering nuclear power station are reported on along with operational experience. So far, the general experience was positive. Furthermore, plans are mentioned to use this type of turbines in other CANDU reactors. (UA) [de

  20. The Pickering mesonet 1988 data report

    International Nuclear Information System (INIS)

    Salmon, J.R.; Taylor, P.A.

    1989-10-01

    This report describes the demonstration mesoscale meteorological monitoring network (mesonet) installed in the vicinity of the Pickering Nuclear Generating Station. It also summarizes the data collected by the network during 1988 and provides some examples of situations in which mesoscale effects dominate the local wind flow

  1. Safe "cloudification" of large images through picker APIs.

    Science.gov (United States)

    Bremer, Erich; Kurc, Tahsin; Gao, Yi; Saltz, Joel; Almeida, Jonas S

    2016-01-01

    The "Box model" allows users with no particular training in informatics, or access to specialized infrastructure, operate generic cloud computing resources through a temporary URI dereferencing mechanism known as "drop-file-picker API" ("picker API" for sort). This application programming interface (API) was popularized in the web app development community by DropBox, and is now a consumer-facing feature of all major cloud computing platforms such as Box.com, Google Drive and Amazon S3. This reports describes a prototype web service application that uses picker APIs to expose a new, "cloudified", API tailored for image analysis, without compromising the private governance of the data exposed. In order to better understand this cross-platform cloud computing landscape, we first measured the time for both transfer and traversing of large image files generated by whole slide imaging (WSI) in Digital Pathology. The verification that there is extensive interconnectivity between cloud resources let to the development of a prototype software application that exposes an image-traversing REST API to image files stored in any of the consumer-facing "boxes". In summary, an image file can be upload/synchronized into a any cloud resource with a file picker API and the prototype service described here will expose an HTTP REST API that remains within the safety of the user's own governance. The open source prototype is publicly available at sbu-bmi.github.io/imagebox. Availability The accompanying prototype application is made publicly available, fully functional, with open source, at http://sbu-bmi.github.io/imagebox://sbu-bmi.github.io/imagebox. An illustrative webcasted use of this Web App is included with the project codebase at https://github.com/SBU-BMI/imageboxs://github.com/SBU-BMI/imagebox.

  2. Clinical Telemedicine Utilization in Ontario over the Ontario Telemedicine Network.

    Science.gov (United States)

    O'Gorman, Laurel D; Hogenbirk, John C; Warry, Wayne

    2016-06-01

    Northern Ontario is a region in Canada with approximately 775,000 people in communities scattered across 803,000 km(2). The Ontario Telemedicine Network (OTN) facilitates access to medical care in areas that are often underserved. We assessed how OTN utilization differed throughout the province. We used OTN medical service utilization data collected through the Ontario Health Insurance Plan and provided by the Ministry of Health and Long Term Care. Using census subdivisions grouped by Northern and Southern Ontario as well as urban and rural areas, we calculated utilization rates per fiscal year and total from 2008/2009 to 2013/2014. We also used billing codes to calculate utilization by therapeutic area of care. There were 652,337 OTN patient visits in Ontario from 2008/2009 to 2013/2014. Median annual utilization rates per 1,000 people were higher in northern areas (rural, 52.0; urban, 32.1) than in southern areas (rural, 6.1; urban, 3.1). The majority of usage in Ontario was in mental health and addictions (61.8%). Utilization in other areas of care such as surgery, oncology, and internal medicine was highest in the rural north, whereas primary care use was highest in the urban south. Utilization was higher and therapeutic areas of care were more diverse in rural Northern Ontario than in other parts of the province. Utilization was also higher in urban Northern Ontario than in Southern Ontario. This suggests that telemedicine is being used to improve access to medical care services, especially in sparsely populated regions of the province.

  3. Development of innovative inspection tools for higher reliability of PHWR fuel

    International Nuclear Information System (INIS)

    Kamalesh Kumar, B.; Viswanathan, B.; Laxminarayana, B.; Ganguly, C.

    2003-01-01

    'Full text:' Advent of Computer aided manufacturing systems has led to very high rate of production with greater reliability. The conventional inspection tools and systems, which are often manual based do not complement with output of highly automated production line. In order to overcome the deficiency, a strategic plan was developed for having automated inspection facility for PHWR fuel assembly line. Laser based systems with their inherently high accuracy and quick response times are a favorite for metrology purpose. Non-contact nature of laser-based measurement ensures minimal contamination, low wear and tear and good repeatability. So far two laser-based systems viz. Pellet density measurement systems and triangulation sensors have been developed. Laser based fuel pellet inspection system and PHWR fuel bundle metric station are under development. Machine vision-based systems have been developed to overcome certain limitations when inspection has to be carried out on such a large scale manually. These deficiencies arise from limitations of resolution, accessibility, fatigue and absence of quantification ability. These problems get further compounded in inspection of fuel components because of their relatively small sizes, close tolerances required and the reflective surfaces. PC based vision system has been developed for inspecting components and fuel assemblies. The paper would touch upon the details of the various laser systems and vision systems that have been indigenously developed for PHWR Fuel Metrology and their impact on the assembly production line. (author)

  4. MATLAB/SIMULINK model of CANDU reactor for control studies

    International Nuclear Information System (INIS)

    Javidnia, H.; Jiang, J.

    2006-01-01

    In this paper a MATLAB/SIMULINK model is developed for a CANDU type reactor. The data for the reactor are taken from an Indian PHWR, which is very similar to CANDU in its design. Among the different feedback mechanisms in the core of the reactor, only xenon has been considered which plays an important role in spatial oscillations. The model is verified under closed loop scenarios with simple PI controller. The results of the simulation show that this model can be used for controller design and simulation of the reactor systems. Adding models of the other components of a CANDU reactor would ultimately result in a complete model of CANDU plant in MATLAB/SIMULINK. (author)

  5. DeepPicker: A deep learning approach for fully automated particle picking in cryo-EM.

    Science.gov (United States)

    Wang, Feng; Gong, Huichao; Liu, Gaochao; Li, Meijing; Yan, Chuangye; Xia, Tian; Li, Xueming; Zeng, Jianyang

    2016-09-01

    Particle picking is a time-consuming step in single-particle analysis and often requires significant interventions from users, which has become a bottleneck for future automated electron cryo-microscopy (cryo-EM). Here we report a deep learning framework, called DeepPicker, to address this problem and fill the current gaps toward a fully automated cryo-EM pipeline. DeepPicker employs a novel cross-molecule training strategy to capture common features of particles from previously-analyzed micrographs, and thus does not require any human intervention during particle picking. Tests on the recently-published cryo-EM data of three complexes have demonstrated that our deep learning based scheme can successfully accomplish the human-level particle picking process and identify a sufficient number of particles that are comparable to those picked manually by human experts. These results indicate that DeepPicker can provide a practically useful tool to significantly reduce the time and manual effort spent in single-particle analysis and thus greatly facilitate high-resolution cryo-EM structure determination. DeepPicker is released as an open-source program, which can be downloaded from https://github.com/nejyeah/DeepPicker-python. Copyright © 2016 Elsevier Inc. All rights reserved.

  6. Pickering interfacial catalysis for biphasic systems: from emulsion design to green reactions.

    Science.gov (United States)

    Pera-Titus, Marc; Leclercq, Loïc; Clacens, Jean-Marc; De Campo, Floryan; Nardello-Rataj, Véronique

    2015-02-09

    Pickering emulsions are surfactant-free dispersions of two immiscible fluids that are kinetically stabilized by colloidal particles. For ecological reasons, these systems have undergone a resurgence of interest to mitigate the use of synthetic surfactants and solvents. Moreover, the use of colloidal particles as stabilizers provides emulsions with original properties compared to surfactant-stabilized emulsions, microemulsions, and micellar systems. Despite these specific advantages, the application of Pickering emulsions to catalysis has been rarely explored. This Minireview describes very recent examples of hybrid and composite amphiphilic materials for the design of interfacial catalysts in Pickering emulsions with special emphasis on their assets and challenges for industrially relevant biphasic reactions in fine chemistry, biofuel upgrading, and depollution. © 2015 WILEY-VCH Verlag GmbH & Co. KGaA, Weinheim.

  7. Fine element (F.E.) modelling of hydrogen migration and blister formation in PHWR coolant channels

    International Nuclear Information System (INIS)

    Prasad, P.S.; Dutta, B.K.; Sinha, R.K.; Kushwaha, H.S.; Mahajan, S.C.; Kakodkar, A.

    1995-01-01

    The formation of a cold spot in pressure tube due to its contact with calandria tube of PHWR coolant results in the migration of Hydrogen in pressure tube towards contact zone from its surrounding material. A 3-D finite element code SPARSH is developed to model the hydrogen redistribution and consequent hydride blister formation due to thermal and Hydrogen concentration gradients. In the present paper, the details and performance of this code are presented. (author). 6 refs., 2 figs

  8. Synthesis of Covalently Cross-Linked Colloidosomes from Peroxidized Pickering Emulsions

    Directory of Open Access Journals (Sweden)

    Nadiya Popadyuk

    2016-10-01

    Full Text Available A new approach to the formation of cross-linked colloidosomes was developed on the basis of Pickering emulsions that were stabilized exclusively by peroxidized colloidal particles. Free radical polymerization and a soft template technique were used to convert droplets of a Pickering emulsion into colloidosomes. The peroxidized latex particles were synthesized in the emulsion polymerization process using amphiphilic polyperoxide copolymers poly(2-tert-butylperoxy-2-methyl-5-hexen-3-ine-co-maleic acid (PM-1-MAc or poly[N-(tert-butylperoxymethylacrylamide]-co-maleic acid (PM-2-MAc, which were applied as both initiators and surfactants (inisurfs. The polymerization in the presence of the inisurfs results in latexes with a controllable amount of peroxide and carboxyl groups at the particle surface. Peroxidized polystyrene latex particles with a covalently grafted layer of inisurf PM-1-MAc or PM-2-MAc were used as Pickering stabilizers to form Pickering emulsions. A mixture of styrene and/or butyl acrylate with divinylbenzene and hexadecane was applied as a template for the synthesis of colloidosomes. Peroxidized latex particles located at the interface are involved in the radical reactions of colloidosomes formation. As a result, covalently cross-linked colloidosomes were obtained. It was demonstrated that the structure of the synthesized (using peroxidized latex particles colloidosomes depends on the amount of functional groups and pH during the synthesis. Therefore, the size and morphology of colloidosomes can be controlled by latex particle surface properties.

  9. The control of emissions from nuclear power reactors in Canada

    International Nuclear Information System (INIS)

    Gorman, D.J.; Neil, B.C.J.; Chatterjee, R.M.

    1988-01-01

    Nuclear power reactors in Canada are of the CANDU pressurised heavy water design. These are located in the provinces of Ontario, Quebec, and New Brunswick. Most of the nuclear generating capacity is in the province of Ontario which has 16 commissioned reactors with a total capacity of 11,500 MWe. There are four reactors under construction with an additional capacity of 3400 MWe. Nuclear power currently accounts for approximately 50% of the electrical power generation of Ontario. Regulation of the reactors is a Federal Government responsibility administered by the Atomic Energy Control Board (AECB) which licenses the reactors and sets occupational and public dose limits

  10. Slit-burst testing of cold-worked Zr-2.5 wt.% Nb pressure tubing for CANDU-PHW reactors

    International Nuclear Information System (INIS)

    Wilkins, B.J.S.; Barrie, J.N.; Zink, R.J.

    1978-12-01

    This report documents the available data on critical crack length of cold-worked Zr-2.5 wt.% Nb pressure tubing in CANDU reactors. In particular, it includes data for tubing removed from the Pickering 3 and 4 reactors. (author)

  11. Sizing of ion exchange column for PHT purification system of 500 MWe Indian PHWR

    Energy Technology Data Exchange (ETDEWEB)

    Goswami, S; Sharma, A K; Bapat, C N; Sharma, V K [Nuclear Power Corporation, Bhabha Atomic Research Centre, Mumbai (India)

    1994-06-01

    Strict chemistry control is required on the heavy water coolant in the primary loop of the PHWR to ensure stability of oxide corrosion film and to prevent corrosion build up on the surfaces. This is achieved by maintaining PD value of PHT coolant at about 10.45 and sp. conductivity between 20 to 40 mhos/cm by ion exchange column and filtration of coolant. This paper deals with the sizing and selection of bed height of ninth column from different methods. (author). 7 refs., 6 figs.

  12. On the feasibility of a CANDU PHWR actinide burner

    International Nuclear Information System (INIS)

    Anton, V.

    1995-01-01

    In this work a review of the current solutions to burn the actinide i.e. the spallation method, LWR, FBR, Siemens proposal and inert matrix is presented. Finally, a proposal is made to use the CANDU PHWR for this purpose, taking into account the techniques envisaged for LWR and the prospect of the advanced fuel cycle in CANDU system. (Author) 5 Refs

  13. Assessing the impact of North American industry developments

    International Nuclear Information System (INIS)

    Williams, T.

    2004-01-01

    The changes within Ontario's electricity market under various government initiatives were outlined with reference to pricing implications, conservation, and opportunities for district energy and energy efficiency. The new government committed to phase out all coal-fired plants in the province by 2007. The OPG Review Committee also issued a report which outlined the future structure of Ontario Power Generation, its role in the market and the potential for refurbishing the Pickering nuclear power units. The Ontario Minister of Energy announced its intention to issue request for proposals (RFPs) for 2500 MW of generation and 300 MW of renewable power. The critical supply and demand issues for the near term include the return of the Pickering A unit and the phase out of coal. The long term issues include conservation and demand response capacity as well as timing of RFPs and phase out and replacement of coal-fired capacity. This presentation also outlined pricing dynamics in the new market structure and plans for conservation. 6 figs

  14. Assessment of ichthyoplankton entrainment at Pickering 'A' NGS using a pump/net in lake system

    International Nuclear Information System (INIS)

    McKinley, R.S.

    1985-03-01

    Annual entrainment at Pickering 'A' NGS was estimated for alewife as 13.6 X 10 6 larvae and 409 X 10 6 eggs. A substantial portion of eggs and larvae entering the intake were dead due to natural mortality (41%-81%) prior to entrainment. Viable eggs and larvae, immediately following entrainment showed mortalities of 54% and 44% respectively. The latent mortality of entrained eggs was 100% (48 h)

  15. The One-Step Pickering Emulsion Polymerization Route for Synthesizing Organic-Inorganic Nanocomposite Particles

    Directory of Open Access Journals (Sweden)

    Kaushal Rege

    2010-02-01

    Full Text Available Polystyrene-silica core-shell nanocomposite particles are successfully prepared via one-step Pickering emulsion polymerization. Possible mechanisms of Pickering emulsion polymerization are addressed in the synthesis of polystyrene-silica nanocomposite particles using 2,2-azobis(2-methyl-N-(2-hydroxyethylpropionamide (VA-086 and potassium persulfate (KPS as the initiator. Motivated by potential applications of “smart” composite particles in controlled drug delivery, the one-step Pickering emulsion polymerization route is further applied to synthesize polystyrene/poly(N-isopropylacrylamide (PNIPAAm-silica core-shell nanoparticles with N-isopropylacrylamide incorporated into the core as a co-monomer. The polystyrene/PNIPAAm-silica composite nanoparticles are temperature sensitive and can be taken up by human prostate cancer (PC3-PSMA cells.

  16. Ontario is not ready to face a large-scale nuclear accident

    International Nuclear Information System (INIS)

    2017-07-01

    On paper, in Japan as elsewhere, nuclear emergency plans are based on international standards and all look similar. The counter measures are sheltering, potassium iodate prophylaxis, evacuation and control of foodstuffs. With 18 nuclear reactors to produce electricity and a research reactor, Ontario should be especially well prepared. Moreover, in USA, there are six power plants located at less than 100 km from the Canadian border. Would Ontario do better than Japan in case of a severe nuclear disaster? Ontario is not ready to face a severe nuclear accident and the population surrounding nuclear power stations are at risk. The large number of inhabitants will hamper protective response actions. Consequently, Canadian authorities keep lax protective action levels. Using more stringent levels would mean to extend the protection zone that would include a too large number of persons. Canadian authorities should openly acknowledge that a severe nuclear accident could happen in Ontario like in any other country and trigger a complete reorganisation of emergency preparedness and response (EP and R) to cope with such a possibility. New response plans should be defined with the involvement of stakeholders

  17. From pioneering to implementing automated blood pressure measurement in clinical practice: Thomas Pickering's legacy

    DEFF Research Database (Denmark)

    Stolarz-Skrzypek, Katarzyna; Thijs, Lutgarde; Wizner, Barbara

    2010-01-01

    Thomas G. Pickering spent most of his scientific career in carrying out research on clinical hypertension and blood pressure (BP) measurement. In our review of Pickering's seminal work, we first focused on white-coat hypertension and masked hypertension, two terms that he had introduced. Next, we...

  18. Evolution of CANDU reactor design

    International Nuclear Information System (INIS)

    Pon, G.A.

    1978-08-01

    The CANDU (CANada Deuterium Uranium) design had its begin-ings in the early 1950's with the preliminary engineering studies that led to the 20 MW(e) NPD (Nuclear Power Demonstration) and the 200 MW(e) Douglas Point station . The next decade saw the first operation of both these stations and the commitment of the 2000 MW(e) Pickering and 3000 MW(e) Bruce plants. The present decade has witnessed the excellent performance of Pickering and Bruce and commitments to construct Gentilly-2, Cordoba, Pt. Lepreau, Wolsung, Pickering B, Bruce B and Darlington. In most cases, successive CANDU designs have meant an increase in plant output. Evolutionary developments have been made to fit the requirements of higher ratings and sizes, new regulations, better reliability and maintainability and lower costs. These changes, which are described system by system, have been introduced in the course of engineering parallel reactor projects with overlapping construction schedules -circumstances which ensure close contact with the practical realities of economics, manufacturing functions, construction activities and performance in commissioning. Features for one project furnished alternative concepts for others still on the drawing board and the experience gained in the first application yielded a sound basis for its re-use in succeeding projects. Thus the experiences gained in NPD, Douglas Point, Gentilly-1 and KANUPP have contributed to Pickering and Bruce, which in turn have contributed to the design of Gentilly-2. (author)

  19. Safe “cloudification” of large images through picker APIs

    Science.gov (United States)

    Bremer, Erich; Kurc, Tahsin; Gao, Yi; Saltz, Joel; Almeida, Jonas S

    2016-01-01

    The “Box model” allows users with no particular training in informatics, or access to specialized infrastructure, operate generic cloud computing resources through a temporary URI dereferencing mechanism known as “drop-file-picker API” (“picker API” for sort). This application programming interface (API) was popularized in the web app development community by DropBox, and is now a consumer-facing feature of all major cloud computing platforms such as Box.com, Google Drive and Amazon S3. This reports describes a prototype web service application that uses picker APIs to expose a new, “cloudified”, API tailored for image analysis, without compromising the private governance of the data exposed. In order to better understand this cross-platform cloud computing landscape, we first measured the time for both transfer and traversing of large image files generated by whole slide imaging (WSI) in Digital Pathology. The verification that there is extensive interconnectivity between cloud resources let to the development of a prototype software application that exposes an image-traversing REST API to image files stored in any of the consumer-facing “boxes”. In summary, an image file can be upload/synchronized into a any cloud resource with a file picker API and the prototype service described here will expose an HTTP REST API that remains within the safety of the user’s own governance. The open source prototype is publicly available at sbu-bmi.github.io/imagebox. Availability The accompanying prototype application is made publicly available, fully functional, with open source, at http://sbu-bmi.github.io/imagebox://sbu-bmi.github.io/imagebox. An illustrative webcasted use of this Web App is included with the project codebase at https://github.com/SBU-BMI/imageboxs://github.com/SBU-BMI/imagebox. PMID:28269829

  20. Characteristics of outage radiation fields around various reactor components

    International Nuclear Information System (INIS)

    Verzilov, Y.; Husain, A.; Corbin, G.

    2008-01-01

    Full text: Activity monitoring surveys, consisting of gamma spectroscopy and dose rate measurements, of various CANDU station components such as the reactor face, feeder cabinet, steam generators and moderator heat exchangers are often performed during shutdown in order to trend the transport of activity around the primary heat transport and moderator systems. Recently, the increased dose expenditure for work such as feeder inspection and replacement in the reactor vault has also spurred interest in improved characterization of the reactor face fields to facilitate better ALARA decision making and hence a reduction in future dose expenditures. At present, planning for reactor face work is hampered by insufficient understanding of the relative contribution of the various components to the overall dose. In addition to the increased dose expenditure for work at the reactor face, maintenance work associated with horizontal flux detectors and liquid injection systems has also resulted in elevated dose expenditures. For instance at Darlington, radiation fields in the vicinity of horizontal flux detectors (HFD) and Liquid Injection Shutdown System (LISS) nozzle bellows are trending upwards with present contact fields being in the range 16-70 rem/h and working distance fields being in the range 100-500 mrem/h. This paper presents findings based on work currently being funded by the CANDU Owners Group. Measurements were performed at Ontario Power Generation's Pickering and Darlington nuclear stations. Specifically, the following are addressed: Characteristics of Reactor Vault Fields; Characteristics of Steam Generator Fields; Characteristics of Moderator Heat Exchanger Fields. Measurements in the reactor vault were performed at the reactor face, along the length of end fittings, along the length of feeders, at the bleed condenser and at the HFD and LISS nozzle bellows. Steam generator fields were characterized at various elevations above the tube sheet, with and without the

  1. Analytical Diagnostics of Non-Optimal Use of Pesticides and Health Hazards for Vegetable Pickers

    International Nuclear Information System (INIS)

    Zafar, M.; Mehmood, T.; Baig, I. A.; Saboor, A.; Sadiq, S.; Mahmood, K.

    2016-01-01

    Economically pesticides are meant to control pests in the fields. Up to certain optimal use of a typical pesticide, it enhances the yield of crops and vegetables. But, eventually amplified use of pesticides results in contamination of environment (water, soil, and air) and increase the health cost of vegetable pickers. The purpose of this study is to estimate the excessive use of pesticides and economic cost of health hazards for the vegetable pickers in district Vehari. Data from 90 respondents were collected and analyzed. The most common health problems identified during the survey were headache, eye irritation, skin infection, cough and shortness of breath. Health cost consists of costs related to precautionary measure, medication, traveling, the opportunity cost of attended persons and productivity loss. The mean health cost of vegetable pickers in the study area was about Rs. 385 per picker per year. Health cost model was used to measure the health cost of vegetable pickers. The regression results showed that pesticides were being applied non-optimally in the study area i.e., number of pesticide applications for vegetables (7-31) were substantially higher than the recommended dose. Health cost function was significantly different from zero as indicated by F-stat (32.18) and it is also supported by R/sup 2/ that about 70 percent variation in health cost is explained by medication accompanied by productivity loss (Rs. 223), precautionary measure (Rs. 134), attended person cost (Rs. 14) and traveling expenditures (Rs. 16). Hence, strict legislation is required to overcome the availability of hazardous pesticides and to keep the vegetable pickers aware of the optimal use of pesticides through appropriate extension services. (author)

  2. An assessment of the adequacy of generation and transmission facilities to meet electricity needs in Ontario: From January 2002 to December 2011

    International Nuclear Information System (INIS)

    2001-01-01

    A ten year forecast of electric power generation and transmission capacity, covering the period 2002 to 2011, is provided. The assessment of the Independent Market Operator is that based on existing and proposed facilities, Ontario has a reliable supply of electricity for the next ten years under a wide variety of conditions, even without taking advantage of opportunities to improve the efficiency of the Ontario electricity market. The key assumptions underlying this forecast were a median growth scenario, with energy demand growing at 1.2 per cent per year, from 152 terawatt-hours in 2002 to 168 terrawatt-hours at the end of the forecast period. Median increase in peak demand is expected to rise from 23,700 MW to 26,000 MW at the end of the period. A low demand growth scenario (0.8 per cent ) and a high demand growth scenario (1.7 per cent) were also studied. Support from neighbouring systems was assumed to be limited to the magnitude of existing firm purchase contracts already identified by the IMO. The Pickering A units are assumed to be recommissioned in 2002 on schedule, but the two Bruce A units, also announced to be returning to service during the period, have not been included in the calculations. This forecast also estimates the collective impact of all proposed new generation projects that have been identified to the IMO. If all generation proposals are built and operated, the amount of generation that is exclusively gas fuelled would comprise about 21 per cent of all installed capacity by 2005. Another 6 per cent would be dual-fuelled with gas. It is the judgement of the IMO that the transmission interfaces studied are capable of supplying the various transmission zones under the generation and demand scenarios considered in this study. A major transmission addition , i.e. 1,250 MW high voltage direct current (HVDC) interconnection between Ontario and Quebec near Ottawa, will improve transfer capabilities between the two provinces. This interconnection

  3. Fuel handling system of Indian 500 MWe PHWR-evolution and innovations

    International Nuclear Information System (INIS)

    Sanatkumar, A.; Jit, I.; Muralidhar, G.

    1996-01-01

    India has gained rich experience in design, manufacture, testing, operation and maintenance of the Fuel Handling System of CANDU type PHWRs. When design and layout of the first 500 MWe PHWR was being evolved, it was possible for us to introduce many special and innovative features in the Fuel Handling System which are friendly for operations and maintenance personnel. Some of these are: Simple, robust and modular mechanisms for ease of maintenance; Shorter turnaround time for refuelling a channel by introduction of transit equipment between the Fuelling Machine (FM) Head and light water equipment; Optimised layout to transport spent fuel in straight and short path and also to facilitate direct wheeling out of the FM Head from the Reactor Building to the Service Building; Provision to operate the FM Head even when the Primary Heat Transport (PHT) System is open for maintenance; Control-console engineered for carrying out refuelling operations in the sitting position; and, Dedicated calibration and maintenance facility to facilitate quick replacement of the FM Head as a single unit. The above special features have been described in this paper. (author). 7 figs

  4. Fuel handling system of Indian 500 MWe PHWR-evolution and innovations

    Energy Technology Data Exchange (ETDEWEB)

    Sanatkumar, A; Jit, I; Muralidhar, G [Nuclear Power Corporation of India Ltd., Mumbai (India)

    1997-12-31

    India has gained rich experience in design, manufacture, testing, operation and maintenance of the Fuel Handling System of CANDU type PHWRs. When design and layout of the first 500 MWe PHWR was being evolved, it was possible for us to introduce many special and innovative features in the Fuel Handling System which are friendly for operations and maintenance personnel. Some of these are: Simple, robust and modular mechanisms for ease of maintenance; Shorter turnaround time for refuelling a channel by introduction of transit equipment between the Fuelling Machine (FM) Head and light water equipment; Optimised layout to transport spent fuel in straight and short path and also to facilitate direct wheeling out of the FM Head from the Reactor Building to the Service Building; Provision to operate the FM Head even when the Primary Heat Transport (PHT) System is open for maintenance; Control-console engineered for carrying out refuelling operations in the sitting position; and, Dedicated calibration and maintenance facility to facilitate quick replacement of the FM Head as a single unit. The above special features have been described in this paper. (author). 7 figs.

  5. Water chemistry features of advanced heavy water reactor

    International Nuclear Information System (INIS)

    Sriram, Jayasree; Vijayan, K.; Kain, Vivekanad; Velmurugan, S.

    2015-01-01

    Advanced Heavy Water Reactor (AHWR) being designed in India proposes to use Plutonium and Thorium as fuel. The objective is to extract energy from the uranium-233 formed from Thorium. It is a heavy water moderated and light water cooled tube type boiling water reactor. It is a heavy water moderated and light water cooled tube type boiling water reactor. It is a natural circulation reactor. Thus, it has got several advanced passive safety features built into the system. The various water coolant systems are listed below. i) Main Heat transport System ii) Feed water system iii) Condenser cooling system iv) Process water system and safety systems. As it is a tube type reactor, the radiolysis control differs from the normal boiling water reactor. The coolant enters the bottom of the coolant channel, boiling takes place and then the entire steam water mixture exits the core through the long tail pipes and reaches the moisture separator. Thus, there is a need to devise methods to protect the tail pipes from oxidizing water chemistry condition. Similarly, the moderator heavy water coolant chemistry differs from that of moderator system chemistry of PHWR. The reactivity worth per ppm of gadolinium and boron are low in comparison to PHWR. As a result, much higher concentration of neutron poison has to be added for planned shutdown, start up and for actuating SDS-2. The addition of higher concentration of neutron poison result in higher radiolytic production of deuterium and oxygen. Their recombination back to heavy water has to take into account the higher production of these gases. This paper also discusses the chemistry features of safety systems of AHWR. In addition, the presentation will cover the chemistry monitoring methodology to be implemented in AHWR. (author)

  6. Development of pre-startup equipment for light water reactors

    International Nuclear Information System (INIS)

    Ram, Rajit; Borkar, S.P.; Dixit, M.Y.; Das, Debashis; Patil, R.K.

    2010-01-01

    Light water reactor (LWR) core typically has high excess reactivity as compared to Pressurized Heavy Water Reactor (PHWR). Unlike PHWR, where online refueling is done, LWR is operated for a long period to achieve maximum fuel burn-up before refueling. Since the reactivity is always reducing with burn-up of the core, the positions of control rods at criticality are always changing in a single direction, i.e. away from the core. Therefore it is possible to start the LWR even if the nuclear instrumentation is not online, provided the criticality position of control rods is known for previous operation. However, for the very first startup, the criticality position of control rods is required to be determined. A special nuclear instrumentation system, called Pre-startup equipment (PSE) is developed using two numbers of in-core detectors along with the processing electronics. The PSE enables operators to determine the criticality position of control rods for the first startup at zero power. The same equipment can also be used during loading of fuel assemblies. This paper discusses the features and architecture of PSE, its individual circuit blocks and specifications. (author)

  7. Conceptual design of a quasi-homogeneous pressurized heavy water reactor to be operated in the closed Th-U233 fuel cycle

    International Nuclear Information System (INIS)

    1979-06-01

    This paper deals with the heavy water reactor, which, from the neutron economy point of view, offers advantages over the light water reactor. Its capability to be fuelled with natural uranium has also been considered a desirable nuclear option by various countries with sufficient domestic uranium resources not wishing to be dependent on the import of enrichment and other fuel cycle services which, in addition, would draw on the foreign exchange reserves. Pressurized heavy water reactors have been designed and built according to two somewhat different versions. While the Canadian CANDU-PHWR concept uses pressure tubes in a nearly unpressurized moderator tank (calandria), the German development line takes advantage of the established and well proven LWR technology, and, thus, uses a pressure vessel design where coolant channels and the surrounding moderator are held at equal pressure. This pressure vessel type heavy water reactor which has been built on a commercial demonstration plant level at ATUCHA in Argentina is described in a companion paper where also a conceptual design for a 685 MWsub(e) PHWR is discussed

  8. Warehouse order-picking process. Order-picker routing problem

    Directory of Open Access Journals (Sweden)

    E. V. Korobkov

    2015-01-01

    Full Text Available This article continues “Warehouse order-picking process” cycle and describes order-picker routing sub-problem of a warehouse order-picking process. It draws analogies between the orderpickers’ routing problem and traveling salesman’s problem, shows differences between the standard problem statement of a traveling salesman and routing problem of warehouse orderpickers, and gives the particular Steiner’s problem statement of a traveling salesman.Warehouse layout with a typical order is represented by a graph, with some its vertices corresponding to mandatory order-picker’s visits and some other ones being noncompulsory. The paper describes an optimal Ratliff-Rosenthal algorithm to solve order-picker’s routing problem for the single-block warehouses, i.e. warehouses with only two crossing aisles, defines seven equivalent classes of partial routing sub-graphs and five transitions used to have an optimal routing sub-graph of a order-picker. An extension of optimal Ratliff-Rosenthal order-picker routing algorithm for multi-block warehouses is presented and also reasons for using the routing heuristics instead of exact optimal algorithms are given. The paper offers algorithmic description of the following seven routing heuristics: S-shaped, return, midpoint, largest gap, aisle-by-aisle, composite, and combined as well as modification of combined heuristics. The comparison of orderpicker routing heuristics for one- and two-block warehouses is to be described in the next article of the “Warehouse order-picking process” cycle.

  9. Estimating the possible range of recycling rates achieved by dump waste pickers: The case of Bantar Gebang in Indonesia.

    Science.gov (United States)

    Sasaki, Shunsuke; Araki, Tetsuya

    2014-06-01

    This article presents informal recycling contributions made by scavengers in the surrounding area of Bantar Gebang final disposal site for municipal solid waste generated in Jakarta. Preliminary fieldwork was conducted through daily conversations with scavengers to identify recycling actors at the site, and then quantitative field surveys were conducted twice. The first survey (n = 504 households) covered 33% of all households in the area, and the second survey (n = 69 households) was conducted to quantify transactions of recyclables among scavengers. Mathematical equations were formulated with assumptions made to estimate the possible range of recycling rates achieved by dump waste pickers. Slightly over 60% of all respondents were involved in informal recycling and over 80% of heads of households were waste pickers, normally referred to as live-in waste pickers and live-out waste pickers at the site. The largest percentage of their spouses were family workers, followed by waste pickers and housewives. Over 95% of all households of respondents had at least one waste picker or one small boss who has a coequal status of a waste picker. Average weight of recyclables collected by waste pickers at the site was estimated to be approximately 100 kg day(-1) per household on the net weight basis. The recycling rate of solid wastes collected by all scavengers at the site was estimated to be in the range of 2.8-7.5% of all solid wastes transported to the site. © The Author(s) 2014.

  10. On site power generation protects water supply for Ajax, Ontario

    Energy Technology Data Exchange (ETDEWEB)

    Morsy, Mohamed

    2011-01-15

    The Ajax water supply plant treats and distribute water for the town of Ajax and the nearby City of Pickering and the operations staff manages two other treatment plants supplying the City of Oshawa and the Town of Whitby, and a dozen pumping stations, reservoirs and elevated tanks. The plant requires around 2 MW of continuous power to supply its 150,000 customers. Although local utility power is reliable, standby generators are mandated by the Ontario Ministry of the Environment. When power goes out problems can result in the plant and system. To avoid these, the Ajax plant staff selected Cummins Power Generation who delivered one 350 kW and two 1500 kW generator sets with automatic transfer switches and paralleling switchgear. These digital systems parallel and synchronize the generator sets with each other and with the utility, which allows the plant to provide continuous service. The plant is designed for twice its current capacity and is ready to handle future requirements.

  11. ROP design for Enhanced CANDU 6 reactor

    Energy Technology Data Exchange (ETDEWEB)

    Hu, J.; Scherbakova, D; Kastanya, D.; Ovanes, M. [Candu Energy Inc., Mississauga, Ontario (Canada)

    2011-07-01

    The Enhanced CANDU 6 (EC6) nuclear power plant is a mid-sized pressurized heavy water reactor design, based on the highly successful CANDU 6 (C6) family of power plants, upgraded to meet today's Canadian and international safety requirements and to satisfy Generation III expectations. The EC6 reactor is equipped with two independent Regional Overpower Protection (ROP) systems to prevent overpowers in the reactor fuel. The ROP system design, retaining the traditional C6 methodology, is determined to cover the End-of-Life (EOL) reactor core condition since the reactor operating/thermal margin gradually decreases as plant equipment ages. Several design changes have been incorporated into the reference C6 plant to mitigate the ageing effect on the ROP trip margin. This paper outlines the basis for the EC6 ROP physics design and presents the ROP related improvements made in the EC6 design to ensure that full power operation is not limited by the ROP throughout the entire life of the reactor. (author)

  12. Development and characterization of novel antimicrobial bilayer films based on Polylactic acid (PLA)/Pickering emulsions.

    Science.gov (United States)

    Zhu, Jun-You; Tang, Chuan-He; Yin, Shou-Wei; Yang, Xiao-Quan

    2018-02-01

    Biodegradable food packaging is sustainable and has a great application prospect. PLA is a promising alternative for petroleum-derived polymers. However, PLA packaging suffers from poor barrier properties compared with petroleum-derived ones. To address this issue, we designed bilayer films based on PLA and Pickering emulsions. The formed bilayer films were compact and uniform and double layers were combined firmly. This strategy enhanced mechanical resistance, ductility and moisture barrier of Pickering emulsion films, and concomitantly enhanced the oxygen barrier for PLA films. Thymol loadings in Pickering emulsion layer endowed them with antimicrobial and antioxidant activity. The release profile of thymol was well fitted with Fick's second law. The antimicrobial activity of the films depended on film types, and Pickering emulsion layer presented larger inhibition zone than PLA layer, hinting that the films possessed directional releasing role. This study opens a promising route to fabricate bilayer architecture creating synergism of each layer. Copyright © 2017 Elsevier Ltd. All rights reserved.

  13. Pickering emulsions for skin decontamination.

    Science.gov (United States)

    Salerno, Alicia; Bolzinger, Marie-Alexandrine; Rolland, Pauline; Chevalier, Yves; Josse, Denis; Briançon, Stéphanie

    2016-08-01

    This study aimed at developing innovative systems for skin decontamination. Pickering emulsions, i.e. solid-stabilized emulsions, containing silica (S-PE) or Fuller's earth (FE-PE) were formulated. Their efficiency for skin decontamination was evaluated, in vitro, 45min after an exposure to VX, one of the most highly toxic chemical warfare agents. Pickering emulsions were compared to FE (FE-W) and silica (S-W) aqueous suspensions. PE containing an oil with a similar hydrophobicity to VX should promote its extraction. All the formulations reduced significantly the amount of VX quantified on and into the skin compared to the control. Wiping the skin surface with a pad already allowed removing more than half of VX. FE-W was the less efficient (85% of VX removed). The other formulations (FE-PE, S-PE and S-W) resulted in more than 90% of the quantity of VX removed. The charge of particles was the most influential factor. The low pH of formulations containing silica favored electrostatic interactions of VX with particles explaining the better elimination from the skin surface. Formulations containing FE had basic pH, and weak interactions with VX did not improve the skin decontamination. However, these low interactions between VX and FE promote the transfer of VX into the oil droplets in the FE-PE. Copyright © 2016 Elsevier B.V. All rights reserved.

  14. A remotely controlled CCTV system for nuclear reactor retube operations

    International Nuclear Information System (INIS)

    Stovman, J.A.

    1984-01-01

    This paper describes the CCTV Vault Observation Subsystem (VOS) under development for Ontario Hydro for the Pickering 'A' Nuclear Power Plant Large Scale Retubing program. This subsystem will be used by a supervisor and several operators to observe fuel channel replacement operations following plant shutdown and removal of the fuel bundles. VOS basically comprises 23 monochrome television camera driven circuits, a matrix switcher, 15 monitors, 9 tape recorders and 4 microphone driven sound circuits. Remote control of the camera's zoom lenses and mounts is via a digitally multiplexed control system. Design considerations include viewing requirements, reliability, radiation, redundance, and economic factors

  15. 1984 annual report

    International Nuclear Information System (INIS)

    1985-04-01

    Ontario Hydro supplied 122.9 billion kilowatt-hours of electricity in 1984 to meet provincial and export demands. Total primary energy demand was 112.3 billion kWh, an increase of 5.9 percent. The year's peak demand of 18.9 kW occurred on January 12. In 1984 nuclear generating stations produced 40.4 billion kWh, 32.8 percent of the total energy supplied by Ontario Hydro. The additional output of two new nuclear units, Pickering-6 and Bruce-6, more than offset the loss of production caused by Pickering units 1 and 2 being out of service all year for retubing. In May, Atomic Energy of Canada Ltd. removed its Douglas Point nuclear station from service since it was no longer economic to operate the station. Nuclear plants produced electricity at an average cost of 2.2 cents per kWh, compared to 3.4 cents for fossil-fuelled plants

  16. The number of pickers and stock-keeping unit arrangement on a uni-directional picking line

    Directory of Open Access Journals (Sweden)

    Hagspihl, Robert

    2014-10-01

    Full Text Available The order picking process is often the single largest expense in a distribution centre (DC. The DC considered in this paper uses a picking line configuration to perform order picking. The number of pickers in a picking line, and the initial arrangement of stock-keeping units (SKUs, are two important factors that affect the total completion time of the picking lines. In this paper, the picking line configuration is simulated with an agent-based approach to describe the behaviour of an individual picker. The simulation is then used to analyse the effect of the number of pickers and the SKU arrangement. Verification and validation of this model shows that the model represents the real-world picking line to a satisfactory degree. Marginal analysis (MA was chosen to determine a ‘good’ number of pickers by means of the simulation model. A look-up table is presented to provide decision support for the choice of a ‘good’ number of pickers to improve completion times of the picking line, for the properties of a specific picking line. The initial SKU arrangement on a picking line is shown to be a factor that can affect the level of picker congestion and the total completion time. The greedy ranking and partitioning (GRP and organ pipe arrangement (OPA techniques from the literature, as well as the historical SKU arrangements used by the retailer under consideration, were compared with the proposed classroom discipline heuristic (CDH for SKU arrangement. It was found that the CDH provides an more even spread of SKUs that are picked most frequently, thus decreasing congestion and total completion time.

  17. Chemical aspects of hydrogen ingress in zirconium and zircaloy pressure tubes: ageing management of Indian PHWR coolant channels - determination of hydrogen and deuterium

    International Nuclear Information System (INIS)

    Sayi, Y.S.; Shankaran, P.S.; Yadav, C.S.; Ramanjaneyulu, P.S.; Venugopal, V.; Ramakumar, K.L.; Chhapru, G.C.; Prasad, R.; Jain, H.C.; Sood, D.D.

    2009-02-01

    Pressurized heavy water reactors (PHWRs) use zirconium and zirconium based alloys as clad and coolant tubes since its beginning. The first ever zircaloy-2 pressure tube failure occurred in 1983 at Ontario Hydro's Pickering Unit 2 in Canada which necessitated a thorough examination of causes of such failure. The failure was attributed to massive hydriding at the failed spot of pressure tube. Continuous usage of zirconium alloys could result in their hydrogen and deuterium pick-up leading to hydrogen/ deuterium embrittlement. The life of the zircaloy coolant channels is dictated by hydrogen/deuterium content and hence ageing management of the pressure tubes is essential for ensuring their trouble-free usage. It is desirable to have a sound knowledge on the chemical aspects of zirconium and zirconium based alloys metallurgy, the mechanistic principles of hydrogen ingress into the pressure tubes during in reactor service, and identifying suitable analytical methodologies for precise and accurate determination of hydrogen in wafer thin sliver samples carved out from insides of pressure tubes without causing any structural damage so that it can continue to remain in service. This is desirable so that the ageing management does not result in cost-escalation. This report is divided in to three main parts. The first part deals with the chemical aspects of zirconium and zirconium based alloy metallurgy, the mechanism of hydrogen pick-up and hydride formation in zirconium matrix. The second part describes various methodologies and their limitations, available for hydrogen/deuterium determination. The third part deals in detail, about the extensive investigations carried out at Radioanalytical Chemistry Division (RACD) in Radiochemistry and Isotope Group for establishing an indigenously developed hot vacuum extraction system in combination with quadrupole mass spectrometry for precise determination of hydrogen and deuterium in wafer thin sliver sample of zircaloy. The

  18. Tritium resources available for fusion reactors

    Science.gov (United States)

    Kovari, M.; Coleman, M.; Cristescu, I.; Smith, R.

    2018-02-01

    The tritium required for ITER will be supplied from the CANDU production in Ontario, but while Ontario may be able to supply 8 kg for a DEMO fusion reactor in the mid-2050s, it will not be able to provide 10 kg at any realistic starting time. The tritium required to start DEMO will depend on advances in plasma fuelling efficiency, burnup fraction, and tritium processing technology. It is in theory possible to start up a fusion reactor with little or no tritium, but at an estimated cost of 2 billion per kilogram of tritium saved, it is not economically sensible. Some heavy water reactor tritium production scenarios with varying degrees of optimism are presented, with the assumption that only Canada, the Republic of Korea, and Romania make tritium available to the fusion community. Results for the tritium available for DEMO in 2055 range from zero to 30 kg. CANDU and similar heavy water reactors could in theory generate additional tritium in a number of ways: (a) adjuster rods containing lithium could be used, giving 0.13 kg per year per reactor; (b) a fuel bundle with a burnable absorber has been designed for CANDU reactors, which might be adapted for tritium production; (c) tritium production could be increased by 0.05 kg per year per reactor by doping the moderator with lithium-6. If a fusion reactor is started up around 2055, governments in Canada, Argentina, China, India, South Korea and Romania will have the opportunity in the years leading up to that to take appropriate steps: (a) build, refurbish or upgrade tritium extraction facilities; (b) extend the lives of heavy water reactors, or build new ones; (c) reduce tritium sales; (d) boost tritium production in the remaining heavy water reactors. All of the alternative production methods considered have serious economic and regulatory drawbacks, and the risk of diversion of tritium or lithium-6 would also be a major concern. There are likely to be serious problems with supplying tritium for future

  19. Exploiting the pliability and lateral mobility of Pickering emulsion for enhanced vaccination

    Science.gov (United States)

    Xia, Yufei; Wu, Jie; Wei, Wei; Du, Yiqun; Wan, Tao; Ma, Xiaowei; An, Wenqi; Guo, Aiying; Miao, Chunyu; Yue, Hua; Li, Shuoguo; Cao, Xuetao; Su, Zhiguo; Ma, Guanghui

    2018-02-01

    A major challenge in vaccine formulations is the stimulation of both the humoral and cellular immune response for well-defined antigens with high efficacy and safety. Adjuvant research has focused on developing particulate carriers to model the sizes, shapes and compositions of microbes or diseased cells, but not antigen fluidity and pliability. Here, we develop Pickering emulsions--that is, particle-stabilized emulsions that retain the force-dependent deformability and lateral mobility of presented antigens while displaying high biosafety and antigen-loading capabilities. Compared with solid particles and conventional surfactant-stabilized emulsions, the optimized Pickering emulsions enhance the recruitment, antigen uptake and activation of antigen-presenting cells, potently stimulating both humoral and cellular adaptive responses, and thus increasing the survival of mice upon lethal challenge. The pliability and lateral mobility of antigen-loaded Pickering emulsions may provide a facile, effective, safe and broadly applicable strategy to enhance adaptive immunity against infections and diseases.

  20. Design considerations, operating and maintenance experience with wet storage of Ontario Hydro's used fuel

    International Nuclear Information System (INIS)

    Frost, C.R.

    1989-01-01

    The characteristics of Ontario Hydro's fuel and at-reactor used fuel storage water pools (or used fuel bays) are described. There are two types of bay, known respectively as primary bays and auxiliary bays, used for at- reactor used fuel storage. Used fuel is discharged remotely from Ontario Hydro's reactors to the primary bays for initial storage and cooling. The auxiliary bays are used to receive and store fuel after its initial cooling in the primary bay, and provide additional storage capacity as needed. With on- power fueling of reactors, each reactor of greater than 500 MW(e) net discharges an average of 10 or more used fuel bundles to bay storage every full power day. The logistics of handling such large quantities of used fuel bundles (corresponding to about 300 te/year of uranium for a 4 unit station) present a challenge to designers and operators. The major considerations in used fuel bay design, including site- specific requirements, reliability and quality assurance, are discussed

  1. Ontario hydro waste storage concepts and facilities

    International Nuclear Information System (INIS)

    Carter, T.J.; Mentes, G.A.

    1976-01-01

    Ontario Hydro presently operates 2,200 MWe of CANDU heavy water reactors with a further 11,000 MWe under design or construction. The annual quantities of low and medium level solid wastes expected to be produced at these stations are tabulated. In order to manage these wastes, Ontario Hydro established a Radioactive Waste Operations Site within the Bruce Nuclear Power Development located on Lake Huron about 250 km northwest of Toronto. The Waste Operations Site includes a 19-acre Storage Site plus a Radioactive Waste Volume Reduction Facility consisting of an incinerator and waste compactor. Ontario has in use or under construction both in-ground and above-ground storage facilities. In-ground facilities have been used for a number of years while the above-ground facilities are a more recent approach. Water, either in the form of precipitation, surface or subsurface water, presents the greatest concern with respect to confinement integrity and safe waste handling and storage operations

  2. Bruce used fuel dry storage project evolution from Pickering to Bruce

    International Nuclear Information System (INIS)

    Young, R.E.

    1996-01-01

    Additional fuel storage capacity is required at Bruce Nuclear Generating Station, which otherwise would soon fill up all its pool storage capacity. The recommended option was to use a dry storage container similar to that at Pickering. The changes made to the Pickering type of container included: fuel to be stored in trays; the container's capacity increased to 600 bundles; the container's lid to be changed to a metal one; the single concrete lid to be changed to a double metal lid system; the container not to be transportable; the container would be dry-loaded. 7 figs

  3. Bruce used fuel dry storage project evolution from Pickering to Bruce

    Energy Technology Data Exchange (ETDEWEB)

    Young, R E [Ontario Hydro, Tiverton, ON (Canada). Bruce Nuclear Generating Station-A

    1997-12-31

    Additional fuel storage capacity is required at Bruce Nuclear Generating Station, which otherwise would soon fill up all its pool storage capacity. The recommended option was to use a dry storage container similar to that at Pickering. The changes made to the Pickering type of container included: fuel to be stored in trays; the container`s capacity increased to 600 bundles; the container`s lid to be changed to a metal one; the single concrete lid to be changed to a double metal lid system; the container not to be transportable; the container would be dry-loaded. 7 figs.

  4. Nuclear cluster strategy Carolinas - Ontario - Saskatchewan

    International Nuclear Information System (INIS)

    Oberth, R.

    2012-01-01

    Organization of Candu Industries (OCI) is an industry association representing the interests of 170 private sector suppliers of products and services to the Canadian and offshore nuclear industries. OCI member companies, mainly in Ontario, employ over 30,000 highly specialized workers with over 12,000 working in nuclear area. OCI's objectives are to sustain the domestic nuclear program by building support among political leaders, the public and local communities, assist OCI member companies in becoming the preferred suppliers for domestic nuclear projects (competitive), assist OCI member companies in international nuclear markets - trade missions and vendor workshops. OCI is at the heart of an 'Ontario nuclear cluster'. The Carolinas have shown what can be achieved when industry, academia, S&T centers and governments collaborate with a shared vision to achieve a common goals. Ontario has the assets to become a stronger center for nuclear excellence. OCI is working to bring the pieces together. Saskatchewan has the assets to become a center of excellence in Small Modular Reactors (SMR) by licensing and constructing the first SMR in Canada.

  5. CARA CVN: inherently safe fuel element for PHWR power plants

    International Nuclear Information System (INIS)

    Brasnarof, Daniel O.; Lestani, Hector A.; Agueda, Horacio C.; Marino, Armando C.; Florido, Pablo C.; Daverio, Hernando

    2007-01-01

    This paper presents design alternatives of the CARA fuel element with negative void reactivity coefficient (CVN) enhancing the PHWR safety for L-LOCA sequences. This design enhances the safety and the operation performance in Atucha and Embalse without changes in the operation conditions. This new design balances wide performance margins of CARA SEU 0.9% previous design, with new intrinsic safety requirements without economic penalties. (author) [es

  6. Licensing assessment of the Candu Pressurized Heavy Water Reactor. Preliminary safety information document. Volume II

    International Nuclear Information System (INIS)

    1977-06-01

    ERDA has requested United Engineers and Constructors (UE and C) to evaluate the design of the Canadian natural uranium fueled, heavy water moderated (CANDU) nuclear reactor power plant to assess its conformance with the licensing criteria and guidelines of the U.S. Nuclear Regulatory Commission (USNRC) for light water reactors. This assessment was used to identify cost significant items of nonconformance and to provide a basis for developing a detailed cost estimate for a 1140 MWe, 3-loop Pressurized Heavy Water Reactor (PHWR) located at the Middletown, USA Site

  7. SF6 ventilation study at Agnew Lake Mines, Ontario

    International Nuclear Information System (INIS)

    1979-03-01

    In September 1978, James F. MacLaren Limited was awarded a contract by the Canada Centre for Mineral and Energy Technology (CANMET) to undertake a ventilation study at an underground uranium mine using sulphur hexafluoride (SF 6 ) as a tracer gas. The mine selected for the study was that of Agnew Lake Mines Limited in Northern Ontario. This is a relatively new mine with the combined mine/mill facilities first operational in mid-1977. Uranium is recovered from broken ore by in-situ leaching. The ventilation study was divided into two phases. A laboratory study was undertaken to develop a practical sampling technique, provide an evaluation of the logistics of long range sample transport and develop a laboratory analytical technique. Field programmes demonstrated the SF 6 tracer gas technique for mine ventilation trouble-shooting with the intent of providing information which will lead to more efficient use of existing mine ventilation capacity. This report outlines the findings of the laboratory study and the two field programmes

  8. Accident sequences evaluation using SFATs for low power and shutdown operation of pressurized heavy water reactors

    International Nuclear Information System (INIS)

    Kim, Chansoo; Chung, Chang-Hyun; Yang, Huichang

    2004-01-01

    To maintain the level of defense-in-depth safety of Pressurized Heavy Water Reactor (PHWR) during LP/SD operation, the qualitative risk evaluation methods such as Safety Function Assessment Trees (SFATs) are required. Therefore SFATs are suggested to assess and manage the PHWR safety in LP/SD. Before this study, safety functions of PHWR were classified into 7 groups; Reactivity Control, Core Cooling, Secondary Heat Removal, Primary Heat Transport Inventory, Essential Electrical Power, Cooling Water, and Containment Integrity. The SFATs for PHWR LP/SD operations were developed along with the Plant Outage Status (POS) variation, and totally 38 SFATs were developed for Wolsung Unit 2. For the verification of SFATs logics developed, top 5 accident sequences those contribute the CDF of PHWR were selected, and plant safety status were evaluated for those accident sequences. Accident sequences such as DCC-4 (Dual Control Computer Failure), CL4-16 (Total Loss of Class IV Power), and FWPV-11 (Loss of Feedwater Supply to SG due to Failure of Pumps/Values) were included. In this research the evaluation of plant safety status by accident sequences using SFATs and the verification of the SFATs were performed. Through the verification of SFAT logics, the enhancements to the internal logics of the SFATs were made, and the dependencies between safety systems and support systems were considered. It is expected the defense-in-depth evaluation model of PHW just as SFATs can be utilized in the configuration risk management program (CRMP) development and improve technical specifications development for Korean PHWRs. (author)

  9. Process Control Logic Modification to Mitigate Transient Following Tripping of a Primary Circulating Pump for a 540 MWe PHWR Power Plant

    International Nuclear Information System (INIS)

    Contractor, Ankur D; Gaikwad, Avinash J.; Kumar, Rajesh; Chakraborty, G.; Vhora, S.F.

    2006-01-01

    The 540 MWe Indian Pressurised Heavy Water Reactor (PHWR) incorporates many new features as compared to the earlier 220 MWe PHWRs. To evaluate the new design features like Primary Heat Transport (PHT) system configuration with two loops, four Primary Circulating Pumps (PCPs) and four passes through core, addition of a Pressurizer (surge Tank) in the PHT system along with Feed/Bleed system and their safety related implications, simulation model have been developed. A reactor step-back is proposed following one PCP trip. The corresponding PCP in the healthy loop is tripped to avoid asymmetrical flow and pressure distribution in the two identical loops. In spite of such elaborate provisions, the margins from high/low PHT pressure are small following tripping of one PCP. Mathematical models for all the major components and sub-systems of the proposed 540 MWe PHWR were developed based on the conservation equations of mass, momentum, energy and equation of state. All the associated control systems are also modeled. The PHT system includes the reactor core with nuclear fuel, PCP, PHT system pressure controller with feed/bleed system and Pressurizer (Surge Tank). The secondary system includes mainly the Steam Generators (SGs), the SG level and pressure controllers, apart from the various steam cycle components. All these models are integrated together to form the Plant Transient Analysis Computer Code Dyna540. The scenario following one PCP trips leads to different states (high/low pressure in Reactor Outlet Header (ROH)) depending upon the banks in which the PCP trips. The pressurizer is connected to two ROHs on one side of the reactor. The system pressure is controlled based on average of four ROHs pressure. In the case of asymmetrical pump operation, this logic leads to a situation where individual ROH pressure goes very near the low/high PHT system pressure trip set point, even though the controlled average pressure is very close to the set pressure. The PHT high

  10. Fuel deposits, chemistry and CANDU® reactor operation

    International Nuclear Information System (INIS)

    Roberts, J.G.

    2014-01-01

    'Hot conditioning' is a process which occurs as part of commissioning and initial start-up of each CANDU® reactor, the first being the Nuclear Power Demonstration - 2 reactor (NPD). Later, understanding of the cause of the failure of the Pickering Unit 1 G16 fuel channelled to a revised approach to 'hot conditioning', initially demonstrated on Bruce Unit 5. The difference being that during 'hot conditioning' of CANDU® heat transport systems fuel was not in-core until Bruce Unit 5. The 'hot conditioning' processes will be briefly described along with the consequences to fuel. (author)

  11. Evolution of PHWR fuel transfer system based on operating experience

    International Nuclear Information System (INIS)

    Parvatikar, R.S.; Singh, Jaipal; Chaturvedi, P.C.; Bhambra, H.S.

    2006-01-01

    Fuel Transfer System facilitates loading of new fuel into Fuelling Machine, receipt of spent fuel from Fuelling Machine and its further transportation to Storage Bay. To overcome the limitations of transferring a pair of bundles in the single tube Airlock and Transfer Arm in RAPS-1 and 2/MAPS, a new concept of six tube Transfer Magazine was introduced in NAPS. This resulted in simultaneous loading of new fuel from Transfer Magazine into the Fuelling Machine and unloading of spent fuel from the Fuelling Machine through the exchange mode. It further facilitated the parallel/simultaneous operation of refuelling by Fuelling Machines on the reactor and transferring of spent fuel bundles from the Transfer Magazine to the bay. This new design of Fuel Transfer System was adopted for all standardised 220 MWe PHWRs. Based on the experience gained in 220 MWe PHWRs in the area of operation and maintenance, a number of improvements have been carried out over the years. These aspects have been further strengthened and refined in the Fuel Transfer System of 540 MWe units. The operating experience of the system indicates that the presence of heavy water in the Transfer Magazine poses limitations in its maintenance in the Fuel Transfer room. Further, Surveillance and maintenance of large number of under water equipment and associated valves, rams and underwater sensors is putting extra burden on the O and M efforts. A new concept of mobile light water filled Transfer Machine has been evolved for proposed 700 MWe PHWR units to simplify Fuel Transfer System. This has been made possible by adopting snout level control in the Fuelling Machine, elimination of Shuttle Transport System and locating the Storage Bay adjacent to the Reactor Building. This paper describes the evolution of Fuel Transfer System concepts and various improvements based on the experience gained in the operation and maintenance of the system. (author)

  12. Water treatment for 500 MWe PHWR plants

    International Nuclear Information System (INIS)

    Vasist, Sudheer; Sharma, M.C.; Agarwal, N.K.

    1995-01-01

    Large quantities of treated water is required for power generation. For a typical 500 MWe PHWR inland station with cooling towers, raw water at the rate of 6000 m 3 /hr is required. Impurities in cooling water give rise to the problems of corrosion, scaling, microbiological contamination, fouling, silical deposition etc. These problems lead to increased maintenance cost, reduced heat transfer efficiency, and possible production cut backs or shutdowns. The problems in coastal based power plants are more serious because of the highly corrosive nature of sea water used for cooling. An overview of the cooling water systems and water treatment method is enumerated. (author). 2 refs., 1 fig

  13. Reactivity control of nuclear power reactors: new options

    International Nuclear Information System (INIS)

    Alcala, F.

    1984-01-01

    Some actual aspects (referring to economy, non-proliferation and environmental impact) of nuclear power reactors has been analyzed from the point of view of the reactivity control physics. Specially studied have been the physical mechanisms related with the spectral shift control method and their general positive effects on those aspects. The analysis carried out suggested the application of the above method of control to reactors with non-hydrogenous fuel cells, which are mainly characterized by their high moderator/fuel ratio. Finally three different types of such fuel cells are presented and some results about one of them (belonging to a PHWR controlled by graphite rods) are given. (author)

  14. MCCI study for Pressurized Heavy Water Reactor under hypothetical accident condition

    International Nuclear Information System (INIS)

    Verma, Vishnu; Mukhopadhyay, Deb; Chatterjee, B.; Singh, R.K.; Vaze, K.K.

    2011-01-01

    In case of severe core damage accident in Pressurized Heavy Water Reactor (PHWR), large amount of molten corium is expected to come out into the calandria vault due to failure of calandria vessel. Molten corium at high temperature is sufficient to decompose and ablate concrete. Such attack could fail CV by basement penetration. Since containment is ultimate barrier for activity release. The Molten Core Concrete Interaction (MCCI) of the resulting pool of debris with the concrete has been identified as an important part of the accident sequence. MCCI Analysis has been carried out for PHWR for a hypothetical accident condition where total core material is considered to be relocated in calandria vault. Concrete ablation rate in vertical and radial direction is evaluated for rectangular geometry using MEDICIS module of ASTEC Code. Amount of gases released during MCCI is also evaluated. (author)

  15. Heterogeneous Pd catalysts as emulsifiers in Pickering emulsions for integrated multistep synthesis in flow chemistry.

    Science.gov (United States)

    Hiebler, Katharina; Lichtenegger, Georg J; Maier, Manuel C; Park, Eun Sung; Gonzales-Groom, Renie; Binks, Bernard P; Gruber-Woelfler, Heidrun

    2018-01-01

    Within the "compartmentalised smart factory" approach of the ONE-FLOW project the implementation of different catalysts in "compartments" provided by Pickering emulsions and their application in continuous flow is targeted. We present here the development of heterogeneous Pd catalysts that are ready to be used in combination with biocatalysts for catalytic cascade synthesis of active pharmaceutical ingredients (APIs). In particular, we focus on the application of the catalytic systems for Suzuki-Miyaura cross-coupling reactions, which is the key step in the synthesis of the targeted APIs valsartan and sacubitril. An immobilised enzyme will accomplish the final product formation via hydrolysis. In order to create a large interfacial area for the catalytic reactions and to keep the reagents separated until required, the catalyst particles are used to stabilise Pickering emulsions of oil and water. A set of Ce-Sn-Pd oxides with the molecular formula Ce 0.99- x Sn x Pd 0.01 O 2-δ ( x = 0-0.99) has been prepared utilising a simple single-step solution combustion method. The high applicability of the catalysts for different functional groups and their minimal leaching behaviour is demonstrated with various Suzuki-Miyaura cross-coupling reactions in batch as well as in continuous flow employing the so-called "plug & play reactor". Finally, we demonstrate the use of these particles as the sole emulsifier of oil-water emulsions for a range of oils.

  16. Pickering irradiated fuel transfer conveyor isolation

    Energy Technology Data Exchange (ETDEWEB)

    Koivisto, D J; Eijsermans, L J [Atomic Energy of Canada Ltd., Mississauga, ON (Canada)

    1997-12-31

    Pickering A NGS has been in operation for 25 years and is one of the longest in service CANDU stations. Some underwater fuel handling equipment, notably the conveyor stops, have been without maintenance throughout that time. This paper describes the concept of a conveyor isolation system that permits draining of a single or multiple elevator columns and also the early stages of a development program for the elastomeric sealing element. The prototype seal element has been proven in lab tests to be capable of limiting leakage to 0.5 IGPM (imperial gallons per minute) at the design pressure of 6.5 psi. The design of a sealing element is particularly interesting because the conveyor tube is a square cross-section which contains an additional obstruction , a conveyor drive cable. A seal delivery, actuating and positioning system has been conceptually laid out and the design is proceeding, with projected implementation in 1998. (author). 8 figs.

  17. Pickering irradiated fuel transfer conveyor isolation

    International Nuclear Information System (INIS)

    Koivisto, D.J.; Eijsermans, L.J.

    1996-01-01

    Pickering A NGS has been in operation for 25 years and is one of the longest in service CANDU stations. Some underwater fuel handling equipment, notably the conveyor stops, have been without maintenance throughout that time. This paper describes the concept of a conveyor isolation system that permits draining of a single or multiple elevator columns and also the early stages of a development program for the elastomeric sealing element. The prototype seal element has been proven in lab tests to be capable of limiting leakage to 0.5 IGPM (imperial gallons per minute) at the design pressure of 6.5 psi. The design of a sealing element is particularly interesting because the conveyor tube is a square cross-section which contains an additional obstruction , a conveyor drive cable. A seal delivery, actuating and positioning system has been conceptually laid out and the design is proceeding, with projected implementation in 1998. (author). 8 figs

  18. Novel carboxymethyl cellulose-polyvinyl alcohol blend films stabilized by Pickering emulsion incorporation method.

    Science.gov (United States)

    Fasihi, Hadi; Fazilati, Mohammad; Hashemi, Mahdi; Noshirvani, Nooshin

    2017-07-01

    The aim of this study was to investigate the possibility of increasing the antimicrobial and antioxidant properties of biodegradable active films stabilized via Pickering emulsions. The blend films were prepared from carboxymethyl cellulose (CMC) and polyvinyl alcohol (PVA), emulsified with oleic acid (OL) and incorporated with rosemary essential oil (REO). Formation of Pickering emulsion was confirmed by scanning electron microscopy (SEM), optical microscopy, mean droplet size and emulsion stability. Morphological, optical, physical, mechanical, thermal, antifungal and antioxidant properties of the films incorporated with different concentrations of REO (0.5, 1.5 and 3%) were determined. The results showed an increase in UV absorbance and elongation at break but, a decrease in tensile strength and thermal stability of the films. Interestingly, films containing REO exhibited considerable antioxidant and antimicrobial properties. In vitro microbial tests exhibited 100% fungal inhibition against Penicillium digitatum in the films containing 3% REO. In addition, no fungal growth were observed after 60days of storage at 25°C in bread slices were stored with active films incorporated with 3% REO, could attributed to the slow and regular release of REO caused by Pickering emulsions. The results of this study suggest that Pickering emulsion is a very promising method, which significantly affects antioxidant and antimicrobial activities of the films. Copyright © 2017 Elsevier Ltd. All rights reserved.

  19. Status of fast reactor development in India (April 1996 - March 1997)

    International Nuclear Information System (INIS)

    Bhoje, S.B.

    1998-01-01

    India generated 395 TWh of electricity during, 4 April 1996 to March 1997. Oil import bill during the year was $9.3 billion. The operating performance of the thermal power reactors has considerably improved during the year and has enhanced the confidence level in nuclear energy in the government and the public. Construction of 4x220 MWe PHWR is continued at two locations. Start of construction of 2x220 MWe PHWR, 2x500 MWe PHWR and 2x1000 MWe WWER (Russian collaboration) and 500 MWe PFBR have been proposed in the IX Plan (1997- 2002). The 13 party coalition government is discussing the IX plan proposals in the power sector. Operation of FBTR at 10.5 MWt is continued The maximum fuel burnup reached is 32,000 MWd/t without any failure. Targeted burnup is 50,000 MWd/t. Post irradiation examination has been completed on one fuel subassembly taken out at 25,000 MWd/t. The performance of the fuel is very good. Turbine was rolled up to synchronous speed of 3000 rpm several times during the year and operation was found to be smooth. TG synchronisation with grid will be achieved during the reactor operation at 12.5 MWt, with the addition of fuel subassemblies in the core. All the activities related to the revision of conceptual design from 4 loop to 2 loop concept are almost complete for the 500 MWe Prototype Fast Breeder Reactor. The main options for the reactor are sodium coolant, pool type, MOX fuel, 2 primary sodium pumps, 2 secondary loops with 4 SG in each loop. The important design activities carried out during the year are plant dynamic studies, decay heat removal analysis, design of pump to grid plate pipe, scram and LOR parameters, location of secondary sodium pump in the secondary sodium circuit and design of fuel handling machines. Important experimental R and D work carried out during the year were testing of prototype primary sodium pump in water, operation of a large sodium test rig to study the heat and mass transfer in the cover gas, testing of dummy fuel

  20. Pickering Emulsions for Food Applications: Background, Trends, and Challenges

    NARCIS (Netherlands)

    Berton-Carabin, C.C.; Schroën, C.G.P.H.

    2015-01-01

    Particle-stabilized emulsions, also referred to as Pickering emulsions, have garnered exponentially increasing interest in recent years. This has also led to the first food applications, although the number of related publications is still rather low. The involved stabilization mechanisms are

  1. Plugging inaccessible leaks in cooling water pipework in nuclear power plants

    International Nuclear Information System (INIS)

    Powell, A.B.; May, R.; Down, M.G.

    1988-01-01

    The manifestation of initially small leaks in ancilliary reactor cooling water systems is not an unusual event. Often these leaks are in virtually inaccessible locations - for example, buried in thick concrete shielding or situated in cramped and highly radioactive vaults. Such leaks may ultimately prejudice the availability of the entire nuclear system. Continued operation without repair can result in the leak becoming larger, and the leaking water can cause further corrosion problems and interfere with instrumentation. In addition, the water may increase the volume of radwaste. In short, initially trivial leaks may cause significant operating problems. This paper describes the sealing of such leaks in the biological shield cooling system of Ontario Hydro's Pickering nuclear generating station CANDU reactors

  2. In-core fuel management programs for nuclear power reactors

    International Nuclear Information System (INIS)

    1984-10-01

    In response to the interest shown by Member States, the IAEA organized a co-ordinated research programme to develop and make available in the open domain a set of programs to perform in-core fuel management calculations. This report summarizes the work performed in the context of the CRP. As a result of this programme, complete in-core fuel management packages for three types of reactors, namely PWR's, BWR's and PHWR are now available from the NEA Data Bank. For some reactor types, these program packages are available with three levels of sophistication ranging from simple methods for educational purposes to more comprehensive methods that can be used for reactor design and operation. In addition some operating data have been compiled to allow code validation. (author)

  3. Application of Genetic Algorithm methodologies in fuel bundle burnup optimization of Pressurized Heavy Water Reactor

    International Nuclear Information System (INIS)

    Jayalal, M.L.; Ramachandran, Suja; Rathakrishnan, S.; Satya Murty, S.A.V.; Sai Baba, M.

    2015-01-01

    Highlights: • We study and compare Genetic Algorithms (GA) in the fuel bundle burnup optimization of an Indian Pressurized Heavy Water Reactor (PHWR) of 220 MWe. • Two Genetic Algorithm methodologies namely, Penalty Functions based GA and Multi Objective GA are considered. • For the selected problem, Multi Objective GA performs better than Penalty Functions based GA. • In the present study, Multi Objective GA outperforms Penalty Functions based GA in convergence speed and better diversity in solutions. - Abstract: The work carried out as a part of application and comparison of GA techniques in nuclear reactor environment is presented in the study. The nuclear fuel management optimization problem selected for the study aims at arriving appropriate reference discharge burnup values for the two burnup zones of 220 MWe Pressurized Heavy Water Reactor (PHWR) core. Two Genetic Algorithm methodologies namely, Penalty Functions based GA and Multi Objective GA are applied in this study. The study reveals, for the selected problem of PHWR fuel bundle burnup optimization, Multi Objective GA is more suitable than Penalty Functions based GA in the two aspects considered: by way of producing diverse feasible solutions and the convergence speed being better, i.e. it is capable of generating more number of feasible solutions, from earlier generations. It is observed that for the selected problem, the Multi Objective GA is 25.0% faster than Penalty Functions based GA with respect to CPU time, for generating 80% of the population with feasible solutions. When average computational time of fixed generations are considered, Penalty Functions based GA is 44.5% faster than Multi Objective GA. In the overall performance, the convergence speed of Multi Objective GA surpasses the computational time advantage of Penalty Functions based GA. The ability of Multi Objective GA in producing more diverse feasible solutions is a desired feature of the problem selected, that helps the

  4. Tailoring the Wettability of Colloidal Particles for Pickering Emulsions via Surface Modification and Roughness

    Directory of Open Access Journals (Sweden)

    Meina Xiao

    2018-06-01

    Full Text Available Pickering emulsions are water or oil droplets that are stabilized by colloidal particles and have been intensely studied since the late 90s. The surfactant-free nature of these emulsions has little adverse effects such as irritancy and contamination of environment and typically exhibit enhanced stability compared to surfactant-stabilized emulsions. Therefore, they offer promising applications in cosmetics, food science, controlled release, and the manufacturing of microcapsules and porous materials. The wettability of the colloidal particles is the main parameter determining the formation and stability of Pickering emulsions. Tailoring the wettability by surface chemistry or surface roughness offers considerable scope for the design of a variety of hybrid nanoparticles that may serve as novel efficient Pickering emulsion stabilizers. In this review, we will discuss the recent advances in the development of surface modification of nanoparticles.

  5. Particle Shape Anisotropy in Pickering Emulsions: Cubes and Peanuts

    NARCIS (Netherlands)

    de Folter, J.W.J.; Hutter, E.M.; Castillo, S.I.R.; Klop, K.E.; Philipse, A.P.; Kegel, W.K.

    2014-01-01

    We have investigated the effect of particle shape in Pickering emulsions by employing, for the first time, cubic and peanut-shaped particles. The interfacial packing and orientation of anisotropic microparticles are revealed at the single-particle level by direct microscopy observations. The uniform

  6. A final report on stress analysis of seal disc of 500 MWe PHWR

    International Nuclear Information System (INIS)

    Chawla, D.S.; Dutta, B.K.; Kushwaha, H.S.; Kakodkar, A.; Sanatkumar, A.

    1989-01-01

    In Pressurised Heavy Water Reactor (PHWR) on-power refuelling is done by use of fuelling machine. Before refuelling, sealing plug assembly is removed from the end-fitting of the coolant channel and after refuelling the sealing plug is reinstalled back in to the end-fitting. The seal disc is a part of sealing plug assembly. Its function is to create sealing action for the heavy water inside the coolant channel. A systematic developmental work is done to arrive at a final configuration of the seal disc. This is done to minimise the stresses in the body of the seal disc and at the same time to obtain required seating reaction to avoid heavy water leakage. It is observed that stresses computed for the final configuration by linear elastic analysis are more than the allowable value as per ASME Section III, Division 1. This calls for elasto-plastic analysis to find out collapse load to satisfy ASME codal limits as per special provision of NB-3228.1 (1986). The elasto-plastic analysis showed that the seal disc meets ASME codal limits for all stages of loading. (author). 8 refs., 2 tabs., 7 figs

  7. Feedback of operation and maintenance experience into evolutionary plant design (HWRs)

    International Nuclear Information System (INIS)

    Hedges, K.R.; Sanatkumar, A.; Kwon, Oh-Cheol

    1999-01-01

    The process of feeding back operation and maintenance information into the CANDU plant design process has been in constant evolution since the beginning of the CANDU program. The commissioning and operation experience from the first commercial reactors at Pickering A and Bruce A was used extensively in the design of the first generation CANDU 6 Plants. These units have been in operation for 15 years, producing electricity at an average lifetime capacity factor of about 85%. In further advancing the CANDU 6 and 9 design, greater emphasis is placed on enhancements that can reduce operational costs and further improve plant performance by reducing the planned outage time. The plant design has been improved to facilitate maintenance scheduling, equipment isolation, maintenance and post maintenance testing. Individual tasks have been analyzed as well as the interaction between tasks during outages to reduce the down time required and simplify the execution of the work. This results in shorter outages, reduced radioactive dose and reduced costs. The Utilities have continued to play an important role in CANDU 6 Evolution. Specifically; the Korea Utility KEPCO has one of the original four CANDU 6 Plants and three of the most modem. Their feedback to the designers has been very helpful. One of the most important feedback processes is through the CANDU Owners Group, which provides information exchange between members. In India eight PHWRs of 220 MWe capacity are in operation. Four reactors, also of 220 MWe capacity are in advanced stages of construction. Site construction work of two units of 500 MWe PHWRs at Tarapur will be taken up shortly. Over the years, during construction and operation of these power stations, a large amount of experience has been accumulated. Operation and maintenance experience is shared with operating stations by intensive participation of design engineers in Station Operation Review meetings, trouble shooting and root cause analysis of problems

  8. Assessment of the impact of fueling machine failure on the safety of the CANDU-PHWR

    International Nuclear Information System (INIS)

    Al-Kusayer, T.A.

    1982-01-01

    A survey of possible LOCA (Loss-of-Coolant Accident) initiating events that might take place for CANDU-PHWRs (Canadian Deuterium Uranium-Pressurized Heavy Water Reactors) has been conducted covering both direct and indirect initiators. Among the 22 initiating events that were surveyed in this study, four direct initiators have been selected and analyzed briefly. Those selected were a pump suction piping break, an isolation valve piping break, a bleed valve failure, and a fueling machine interface failure. These were selected as examples of failures that could take place in the inlet side, outlet side, or PHTS (Primary Heat Transport System) interfaces. The Pickering NGS (Unit-A) was used for this case study. Double failure (failure of the protective devices to operate when the process equipment fault occurs) and a triple failure (failure of the protective devices and the ECCS as well as the process equipment) were found to be highly improbable

  9. Evaluation of a dilute chemical decontaminant for pressurized heavy water reactors

    International Nuclear Information System (INIS)

    Velmurugan, S.; Narasimhan, S.V.; Mathur, P.K.; Venkateswarlu, K.S.

    1991-01-01

    In this paper a dilute chemical decontamination formulation based on ethylene diamine tetraacetic acid, oxalic acid, and citric acid is evaluated for its efficacy in removing oxide layers in a pressurized heavy water reactor (PHWR). An ion exchange system that is specifically suited for fission product-dominated contamination in a PHWR is suggested for the reagent regeneration stage of the decontamination process. An attempt has been made to understand the redeposition behavior of various isotopes during the decontamination process. The polarographic method of identifying the species formed in the dissolution process is explained. Electrochemical measurements are employed to follow the course of oxide removal during the dissolution process. Scanning electron micrographs of metal coupons before and after the dissolution process exemplify the involvement of base metal in the formation of a ferrous oxalate layer. Material compatibility tests between the decontaminant and carbon steel, Monel-400, and Zircaloy-2 are reported

  10. Thermal hydraulic simulation of the CANDU nuclear reactor

    Energy Technology Data Exchange (ETDEWEB)

    Carvalho, Athos M.S.S. de; Ramos, Mario C.; Costa, Antonella L.; Fernandes, Gustavo H.N., E-mail: athos1495@yahoo.com.br [Universidade Federal de Minas Gerais (UFMG), Belo Horizonte, MG (Brazil). Departamento de Engenharia Nuclear; Instituto Nacional de Ciência e Tecnologia de Reatores Nucleares Inovadores (INCT/CNPq), Rio de janeiro, RJ (Brazil)

    2017-07-01

    The CANDU (Canada Deuterium Uranium) is a Canadian-designed power reactor of PHWR type (Pressurized Heavy Water Reactor) that uses heavy water (deuterium oxide) for moderator and coolant, and natural uranium for fuel. There are about 47 reactors of this type in operation around the world generating more than 23 GWe, highlighting the importance of this kind of device. In this way, the main purpose of this study is to develop a thermal hydraulic model for a CANDU reactor to aggregate knowledge in this line of research. In this way, a core modeling was performed using RELAP5-3D code. Results were compared with reference data to verify the model behavior in steady state operation. Thermal hydraulic parameters as temperature, pressure and mass flow rate were verified and the results are in good agreement with reference data, as it is being presented in this work. (author)

  11. Studies on flow induced vibration of reactivity devices of 700 MWe Indian PHWR

    Energy Technology Data Exchange (ETDEWEB)

    Prabhakaran, K.M., E-mail: kmprabha@yahoo.com [Reactor Safety Division, Bhabha Atomic Research Centre, Mumbai 400 085 (India); Goyal, P.; Dutta, Anu; Bhasin, V.; Vaze, K.K.; Ghosh, A.K. [Reactor Safety Division, Bhabha Atomic Research Centre, Mumbai 400 085 (India); Pillai, Ajith V.; Mathew, Jimmy [Nuclear Power Corporation of India Ltd., Mumbai 400 094 (India)

    2012-03-15

    Highlights: Black-Right-Pointing-Pointer FIV studies on internals of heavy water filled calandria of 700 MWe Indian PHWR is presented. Black-Right-Pointing-Pointer This includes CFD and structural dynamic analysis to predict the dynamic behavior of component lying inside calandria. Black-Right-Pointing-Pointer Results of these calculations as well as conclusions from this investigation are presented. Black-Right-Pointing-Pointer It is established that FIV is not a concern in the present design of calandria internals. - Abstract: Component failures due to excessive flow-induced vibration are still affecting the performance and reliability of nuclear power stations. Tube failures due to fretting-wear in nuclear steam generators, and vibration related damage of reactor internals are of particular concern. In the Indian nuclear industry, flow induced vibrations are assessed early in the design process and the results are incorporated in the design procedures. In this paper the details of flow induced vibration studies on internals like liquid zone control unit and poison injection units of heavy water filled calandria of 700 MWe Indian pressurized heavy water reactor is given. This includes computational fluid dynamics studies from which the velocities are extracted for the components lying inside the calandria. With these velocities as input, further studies are performed to predict the dynamic behavior of these components. Results of these calculations as well as conclusions derived from this investigation are presented. Based on the studies it has been established that flow induced vibration is not a concern in the present design of 700 MWe calandria internals.

  12. Current status of 700 MWe class PHWR NSSS design and engineering technology

    International Nuclear Information System (INIS)

    Park, Tae Keun; Suh, Sung Ki

    1996-06-01

    The capability of NSSS design and engineering technology of KAERI for 700 MWe class PHWR (CANDU 6) as of 1996 March 30 is comprehensively summarized in this report. The design and engineering capability of KAERI which have been gained during the implementation of Wolsung 2, 3 and 4 project are assessed, and showed with tangible scale. The status of Technology Transfer Materials received from Atomic Energy of Canada Limited under the Technology Transfer Agreement (TTA) which is effective simultaneously to Wolsung 3 and 4 contract, is also given in this report. The division of responsibility (DOR) of KAERI for Wolsung 2 and Wolsung 3 and 4 contract is also given, and expansion of DOR from Wolsung 2 contract to Wolsung 3 and 4 is presented. 3 refs. (Author)

  13. Seismic assessment of the Pickering pressure relief duct

    International Nuclear Information System (INIS)

    Ghobarah, A.

    1995-05-01

    The objectives of the study are to examine the structural response of the Pickering pressure relief duct when subjected to earthquake ground motion and to estimate the seismic withstand capacity of various components of the structural system on the basis of performance criteria consistent with the safety function of the duct. (author). 24 refs., 16 tabs., 31 figs

  14. Development of in-situ laser cutting technique for removal of single selected coolant channel from pressurized heavy water reactor

    International Nuclear Information System (INIS)

    Vishwakarma, S.C.; Upadhyaya, B.N.

    2016-01-01

    We report on the development of a pulsed Nd:YAG laser based cutting technique for removal of single coolant channel from pressurized heavy water reactor (PHWR). It includes development of special tools/manipulators and optimization of laser cutting process parameters for cutting of liner tube, end fitting, bellow lip weld joint, and pressure tube stubs. For each cutting operation, a special tool with precision motion control is utilized. These manipulators/tools hold and move the laser cutting nozzle in the required manner and are fixed on the same coolant channel, which has to be removed. This laser cutting technique has been successfully deployed for removal of selected coolant channels Q-16, Q-15 and N-6 of KAPS-2 reactor with minimum radiation dose consumption and in short time. (author)

  15. Quality surveillance experience of PHWR fuel

    International Nuclear Information System (INIS)

    Kulkarni, P.G.; Bandyopadhyay, A.K.; Shah, B.K.

    1997-01-01

    Quality Surveillance activities are being carried out for PHWR fuel for over 25 years in India. A large number of fuel bundles of 19 element design have been produced and successfully irradiated. The quality surveillance practices follow the guidelines given in various Quality Assurance Codes and Guides. An independent third party surveillance is provided to cover major manufacturing and quality control operations. A system of design basis review periodic quality audit and regulatory safety review is in place. Over the years there have been modifications in the quality assurance procedures to comply with changing requirements. Also many innovative improvements have been introduced in the manufacturing procedures. Similarly quality control activities are also modified. Developments in fuel has remained a continuous activity. The paper summarizes the experience gathered over many years in this exciting process of innovation and improvement. (author)

  16. PHWR fuel fabrication with imported uranium - procedures and processes

    International Nuclear Information System (INIS)

    Rao, R.V.R.L.V.; Rameswara Rao, A.; Hemantha Rao, G.V.S.; Jayaraj, R.N.

    2010-01-01

    Following the 123 agreement and subsequent agreements with IAEA & NSG, Government of India has entered into bilateral agreements with different countries for nuclear trade. Department of Atomic Energy (DAE), Government of India, has entered into contract with few countries for supply of uranium material for use in the safeguarded PHWRs. Nuclear Fuel Complex (NFC), an industrial unit of DAE, established in the early seventies, is engaged in the production of Nuclear Fuel and Zircaloy items required for Nuclear Power Reactors operating in the country. NFC has placed one of its fuel fabrication facilities (NFC, Block-A, INE-) under safeguards. DAE has opted to procure uranium material in the form of ore concentrate and fuel pellets. Uranium ore concentrate was procured as per the ASTM specifications. Since no international standards are available for PHWR fuel pellets, Specifications have to be finalized based on the present fabrication and operating experience. The process steps have to be modified and fine tuned for handling the imported uranium material especially for ore concentrate. Different transportation methods are to be employed for transportation of uranium material to the facility. Cost of the uranium material imported and the recoveries at various stages of fuel fabrication have impact on the fuel pricing and in turn the unit energy costs. Similarly the operating procedures have to be modified for safeguards inspections by IAEA. NFC has successfully manufactured and supplied fuel bundles for the three 220 MWe safeguarded PHWRs. The paper describes various issues encountered while manufacturing fuel bundles with different types of nuclear material. (author)

  17. Ontario's new electricity market and the future of OPG

    International Nuclear Information System (INIS)

    Howes, H.

    2002-01-01

    The recent measures taken by Ontario Power Generation since 1998 to deregulate the electricity market in the province of Ontario are reviewed. The opening of Ontario's power market in May 2002 will oblige Ontario Power Generation to reduce its market share. The author reviewed the current status of the energy market in Ontario and noted a modest growth in demand. A significant portion of the energy supply is being provided by nuclear, fossil fuels and hydro energy. The challenge facing Ontario Power Generation is to stay competitive in the new deregulated market and to participate in the energy market in the United States. 6 figs

  18. An evolutionary approach to advanced water cooled reactors

    International Nuclear Information System (INIS)

    Antariksawan, A.R.; Subki, I.

    1997-01-01

    Based on the result of the Feasibility Study undertaken since 1991, Indonesia may enter in the new nuclear era by introduction of several Nuclear Power Plants in our energy supply system. Requirements for the future NPP's are developed in two step approach. First step is for the immediate future that is the next 50 years where the system will be dominated by A-LWR's/A-PHWR's and the second step is for the time period beyond 50 years in which new reactor systems may start to dominate. The integral reactor concept provides a revolutionary improvements in terms of conceptual and safety. However, it creates a new set of complex machinery and operational problems of its own. The paper concerns with a brief description of nuclear technology status in Indonesia and a qualitative assessment of integral reactor concept. (author)

  19. Electrosleeve process for in-situ nuclear steam generator repair

    International Nuclear Information System (INIS)

    Renaud, E.; Brennenstuhl, A.M.; Stewart, D.R.; Gonzalez, F.

    2000-01-01

    Degradation of steam generator tubing by localized corrosion is a widespread problem in the nuclear industry that can lead to costly forced outages, unit derating, steam generator replacement or even the permanent shutdown of a reactor. In response to the onset of steam generator degradation at Ontario Power Generation's Pickering Nuclear Generating Station (PNGS) Unit 5, and the determined unsuitability of conventional repair methods (mechanically expanded or welded sleeves) for Alloy 400, an alternative repair technology was developed. Electrosleeve is a non-intrusive, low-temperature process that involves the electrodeposition of a nanocrystalline nickel microalloy forming a continuously bonded, structural layer over the internal diameter of the degraded region. This technology is designed to provide a long-term pressure boundary repair, fully restoring the structural integrity of the damaged region to its original state. This paper describes the Electrosleeve process for steam generator tubing repair and the unique properties of the advanced sleeve material. The successful installation of fourteen Electrosleeves that have been in service for more than six years in Alloy 400 tubing at the Pickering-S CANDU unit, and the more recent (Nov. 99) extension of the technology to Alloy 600 by the installation of 57 sleeves in a U.S. pressurized water reactor (PWR) at Callaway, is presented. The Electrosleeve process has been granted a conditional license by the U.S. Nuclear Regulatory Commission (NRC). In Canada, the process of licensing Electrosleeve with the CNSC / TSSA has begun. (author)

  20. Evaluation of microstructure of irradiated fuel channel components of PHWR

    International Nuclear Information System (INIS)

    Ramadasan, E.

    2005-01-01

    Performance evaluation and failure analysis of irradiated reactor structural components such as those in-core and PHT circuit components necessitate metallographic evaluation using special metallographic specimen preparation techniques due to the radiation dose and contamination levels involved in handling the specimens. The metallographic specimen preparation techniques that are resorted to involve use of fully automatic and semi automatic machines, shielded metallographic microscope and specialised equipment developed for lead-cell metallography. The techniques used and the results obtained in the metallographic studies on irradiated fuel channel components such as pressure tubes and garter springs of various Indian PHWRs at RAPS, NAPS and MAPS are presented as case studies in the paper. The evaluation of oxidation and hydriding behaviour of zircaloy-2 pressure tubes and garter springs are presented. The paper also gives in detail the microstructural evaluation of hydride blistering seen at the PT-CT contact location of the pressure tubes of RAPS-2. The evaluation revealed that the hydride blisters was small compared to their length, unlike the hydride blisters seen in the CANDU pressure tube G-16 of Pickering-2. This could be attributed to be due to the difference in the annulus conditions between the two types of reactors. The hydride blisters in J-07 pressure tube of RAPS-2 had ductile material adjacent to them. The paper also gives the hydride blistering observation on irradiated Zr-2.5% Nb-0.5% Cu garter springs of RAPS-2. It was seen that there was only negligible hydriding of the garter springs during service through they showed presence of benign hydride blisters in them. The general hydriding observations made on the pressure tubes of Indian PHWRs under different conditions are also presented. (author)

  1. Serological studies on the infection of dogs in Ontario with Borrelia burgdorferi, the etiological agent of Lyme disease

    Science.gov (United States)

    Artsob, Harvey; Barker, Ian K.; Fister, Richard; Sephton, Gregory; Dick, Daryl; Lynch, John A.; Key, Doug

    1993-01-01

    A serological study was undertaken to determine whether dogs in Ontario are being exposed to Borrelia burgdorferi, the etiological agent of Lyme disease. This study consisted of a survey of randomly selected dogs and testing of diagnostic submissions from candidate Lyme disease cases. The survey of 1,095 dogs, bled between January 1988 and August 1989, revealed a total of 65 (5.9%) enzyme-linked immunosorbent assay (ELISA) reactors, of which 22 had immuno-fluorescent antibody assay (IFA) titers ≥1:32. All but one of the IFA-positive and 10 of the ELISA-positive, IFA-negative sera were further tested by western blot. Eight western blot positive and three equivocal reactors were obtained. Three of the eight confirmed reactors had visited areas known to be endemic for Lyme disease, leaving five reactors that might have been infected in previously undocumented areas for B. burgdorferi activity in Ontario. Diagnostic submissions of sera from 223 dogs were received between August 1987 and February 1992. Test results revealed 21 (9.4%) IFA reactors, of which only six had significant titers (≥1:256) and were reactive by an immunodot Borrelia test. All six dogs had travelled to known Lyme endemic areas. Based on results obtained from this study, it seems likely that the agent of Lyme disease is not widespread in Ontario. PMID:17424284

  2. Aquivion Perfluorosulfonic Superacid as an Efficient Pickering Interfacial Catalyst for the Hydrolysis of Triglycerides.

    Science.gov (United States)

    Shi, Hui; Fan, Zhaoyu; Hong, Bing; Pera-Titus, Marc

    2017-09-11

    Rational design of the surface properties of heterogeneous catalysts can boost the interfacial activity in biphasic reactions through the generation of Pickering emulsions. This concept, termed Pickering interfacial catalysis (PIC), has shown promising credentials in acid-catalyzed transesterification, ester hydrolysis, acetalization, etherification, and alkylation reactions. PIC has now been applied to the efficient, solvent-free hydrolysis of the triglyceride glyceryl trilaurate to lauric acid, catalyzed by Aquivion perfluorosulfonic superacid at mild conditions (100 °C and ambient pressure). © 2017 Wiley-VCH Verlag GmbH & Co. KGaA, Weinheim.

  3. Study of the time effect on the strength of cell-cell adhesion force by a novel nano-picker

    Energy Technology Data Exchange (ETDEWEB)

    Shen, Yajing, E-mail: shen@robo.mein.naogya-u.ac.jp [Dept. of Micro-Nano Systems Engineering, Nagoya University, Nagoya 464-8603 (Japan); Nakajima, Masahiro [Center for Micro-Nano Mechatronics, Nagoya University, Nagoya 464-8603 (Japan); Kojima, Seiji; Homma, Michio [Division of Biological Science, Nagoya University, Nagoya 464-8603 (Japan); Fukuda, Toshio [Dept. of Micro-Nano Systems Engineering, Nagoya University, Nagoya 464-8603 (Japan); Center for Micro-Nano Mechatronics, Nagoya University, Nagoya 464-8603 (Japan)

    2011-06-03

    Highlights: {yields} A nano-picker is developed for single cell adhesion force measurement. {yields} The adhesion of picker-cell has no influence to the cell-cell measurement result. {yields} Cell-cell adhesion force has a rise at the first few minutes and then becomes constant. -- Abstract: Cell's adhesion is important to cell's interaction and activates. In this paper, a novel method for cell-cell adhesion force measurement was proposed by using a nano-picker. The effect of the contact time on the cell-cell adhesion force was studied. The nano-picker was fabricated from an atomic force microscopy (AFM) cantilever by nano fabrication technique. The cell-cell adhesion force was measured based on the deflection of the nano-picker beam. The result suggests that the adhesion force between cells increased with the increasing of contact time at the first few minutes. After that, the force became constant. This measurement methodology was based on the nanorobotic manipulation system inside an environmental scanning electron microscope. It can realize both the observation and manipulation of a single cell at nanoscale. The quantitative and precise cell-cell adhesion force result can be obtained by this method. It would help us to understand the single cell interaction with time and would benefit the research in medical and biological fields potentially.

  4. Ontario perspective on interregional markets

    International Nuclear Information System (INIS)

    Shalaby, A.

    2003-01-01

    On May 1, 2002, wholesale and retail electricity markets in Ontario were opened to competition. The industry structure has been completely unbundled into separate entities for power generation, distribution and transmission. There are currently 20 generators, 90 distributors and 4 transmitters in Ontario. Trade with neighbouring jurisdictions has increased and now accounts for 10 to 15 per cent of demand on summer peak days. Import/export capability with the United States (northeast and midwest) and other Canadian provinces (Quebec and Manitoba) is 4,000 to 6,000 MW. Ontario has not had new generation or transmission capacity in several years and the heat waves of summer 2002 resulted in a heavier power demand than forecasted. The province had to rely heavily on power imports resulting in high and volatile electricity prices. In response to customer complaints, the Ontario government froze retail rates and in a recent policy directive announced a public ownership policy for transmission with further consultation on improving supply competition in Ontario. FERC order 888 and the increased role of independent power producers has improved trading opportunities between Canada and the United States. The presentation highlighted recent trade trends and outlined the specific impact of the Standard Market Design on Canadian markets. It was noted that Ontario should work on ensuring power reliability, transmission planning, inter-regional coordination, and joint investments with neighbouring jurisdictions. 9 figs

  5. Structural contour, isopach and feature maps of quaternary sediments in Western Lake Ontario

    International Nuclear Information System (INIS)

    Lewis, C.F.M.; King, E.L.; Todd, B.J.; Blasco, S.M.

    1995-06-01

    A systematic high-resolution acoustic reconnaissance survey of Quaternary sediments (> 50 m thick, in places) and the underlying bedrock surface was completed for western Lake Ontario between Burlington and Port Hope, Ontario, to determine if geophysical lineaments through the area of Pickering and Darlington nuclear power stations are potentially seismically active. A total of 2530 line-km of data were obtained along N-S and E-W lines spaced 10 and 5 km respectively, using a high-resolution subbottom profiler (boomer and IKB-SEISTEC), a 100 kHz sidescan sonar (150-m range) with 3.5 kHz profiler, a 10 or 40 cu. in. sleeve gun seismic reflection system, and, intermittently, a marine magnetometer. Six piston cores up to 15-m long were collected to compare sediment lithology with key regional seismic reflectors. Sediments deposited over the past 13,000 years were imaged with vertical resolution in the order of 10-30 cm just below the lakebed and less than 1 m at the bedrock surface; resolution for the sleeve gun system is approximately 3-5 m. Digital processing and rescaling of selected seismic profiles aided interpretation. Structural contour maps for three Quaternary sequence boundaries and the bedrock surface were generated together with the related sequence isopach maps. Three additional maps portray lakebed features identified on sidescan sonar records and subsurface features identified on seismic profiles. All maps are at 1:250,000 scale. (author). 2 tabs., 48 figs., 12 maps

  6. Peer evaluation and some valuable lessons

    Energy Technology Data Exchange (ETDEWEB)

    Holt, A G [Ontario Hydro, Toronto, ON (Canada)

    1991-04-01

    In the mid 1980s there were some signs that Ontario Hydro's nuclear program performance was deteriorating. Such signs included increased maintenance backlog, increased number of jumpers, decreased capacity factors and increasing regulatory concerns. Factors influencing this deterioration were: (a) Pressure tube creep and hydriding rates were excessive leading to increased reactor maintenance and early pressure tube replacement in Pickering NGS-A and Bruce NGS-A. (b) Preventive maintenance was reduced to a minimum owing to manpower and budget restraints. This led to more forced outages, deratings and breakdown maintenance as the urgent was dealt with rather than the important. (c) New systems were installed in the older units, Pickering NGS-A and Bruce NGS-A, in order to backfit safety related system improvements principally to meet increased regulatory requirements. This put additional strain on tight resources to assist with the installation, commissioning, testing and maintenance of these systems that generally increased the complexity of units. Again this led to a reduction of preventive maintenance.

  7. Peer evaluation and some valuable lessons

    International Nuclear Information System (INIS)

    Holt, A.G.

    1991-01-01

    In the mid 1980s there were some signs that Ontario Hydro's nuclear program performance was deteriorating. Such signs included increased maintenance backlog, increased number of jumpers, decreased capacity factors and increasing regulatory concerns. Factors influencing this deterioration were: (a) Pressure tube creep and hydriding rates were excessive leading to increased reactor maintenance and early pressure tube replacement in Pickering NGS-A and Bruce NGS-A. (b) Preventive maintenance was reduced to a minimum owing to manpower and budget restraints. This led to more forced outages, deratings and breakdown maintenance as the urgent was dealt with rather than the important. (c) New systems were installed in the older units, Pickering NGS-A and Bruce NGS-A, in order to backfit safety related system improvements principally to meet increased regulatory requirements. This put additional strain on tight resources to assist with the installation, commissioning, testing and maintenance of these systems that generally increased the complexity of units. Again this led to a reduction of preventive maintenance

  8. The pressurized heavy water reactor programme in the Republic of Korea

    International Nuclear Information System (INIS)

    Young Eek Jung

    1997-01-01

    KEPCO (Korea Electric Power Corporation) opened its HWR program in 1977 by starting the construction of Wolsong 1 (CANDU-6). Wolsong 1 completed its construction in 1983 and has been operated successfully achieving an average lifetime capacity factor of 85%. As far as PHWR technology is concerned, KEPCO did not have self reliance program like PWR but for the PHWR technology development of Korea, KEPCO and AECL made technology transfer agreement for the CANDU-6 NSSS design at the time of Wolsong 3 and 4 contracts. Under this agreement, AECL has provided the CANDU-6 design technology and it is contributing to the development of Korean PHWR design technology. In the field of fuel, KAERI (Korea Atomic Energy Research Institute) is carrying out the feasibility study of CANFLEX and DUPIC. Planning of future CANDU projects in Korea as well as type and capacity if constructed is under study by KEPCO. The economic aspects of CANDU-6, the future prospects of CANDU-9 technology development and availability of construction site will be the important points of study and it will be finished next year. The result of study will be reflected to the new Korean electric power development plan, which will extend Korean power plant construction schedule until 2010

  9. CANDU plant life management - An integrated approach

    International Nuclear Information System (INIS)

    Charlebois, P.; Hart, R.S.; Hopkins, J.R.

    1998-01-01

    Commercial versions of CANDU reactors were put into service starting more than 25 years ago. The first unit of Ontario Hydro's Pickering A station was put into service in 1971, and Bruce A in 1977. Most CANDU reactors, however, are only now approaching their mid-life of 15 to 20 years of operation. In particular, the first series of CANDU 6 plants which entered service in the early 1980's were designed for a 30 year life and are now approaching mid life. The current CANDU 6 design is based on a 40 year life as a result of advancement in design and materials through research and development. In order to assure safe and economic operation of these reactors, a comprehensive CANDU Plant Life Management (PLIM) program is being developed from the knowledge gained during the operation of Ontario Hydro's Pickering, Bruce, and Darlington stations, worldwide information from CANDU 6 stations, CANDU research and development programs, and other national and international sources. This integration began its first phase in 1994, with the identification of most of the critical systems structures and components in these stations, and a preliminary assessment of degradation and mechanisms that could affect their fitness for service for their planned life. Most of these preliminary assessments are now complete, together with the production of the first iteration of Life Management Plans for several of the systems and components. The Generic CANDU 6 PLIM program is now reaching its maturity, with formal processes to systematically identify and evaluate the major CSSCs in the station, and a plan to ensure that the plant surveillance, operation, and maintenance programs monitor and control component degradation well within the original design specifications essential for the plant life attainment. A Technology Watch program is being established to ensure that degradation mechanisms which could impact on plant life are promptly investigated and mitigating programs established. The

  10. A PHWR with slightly enriched uranium about the first core

    International Nuclear Information System (INIS)

    Notari, C.

    1997-01-01

    Many different studies have been performed in Argentina regarding the use of slightly enriched uranium in the PHWR nuclear plants. These referred mainly to operating plants so that a transition had to be considered from the present natural uranium fuel cycle to the slightly enriched one. In this analysis, technical and economical arguments are presented which favor the use of a natural uranium initial core. The levelized fuel costs are shown to be practically insensitive to the first core and a fast transition is more influential than an initially enriched core. (author)

  11. Performance of indigenous resistance welding equipment for PHWR fuel fabrication in NFC

    International Nuclear Information System (INIS)

    Hemantha Rao, G.V.S.; Jayaraj, R.N.; Prakash, M.S.; Gupta, U.C.; Ganguly, C.

    1999-01-01

    Indigenisation of critical equipment for manufacturing of PHWR fuel and automation in the production line have been the main thrust in NFC in recent years. As part of this endeavour, resistance welding equipment for end plug welding of Zircaloy-4 clad Uranium Oxide fuel pin and end plates of 19-element fuel bundles have been developed. The paper discusses the equipment design features, critical operating parameters and performance of these indigenous welding machines. (author)

  12. Picker versus stripper harvesters on the High Plains of Texas

    Science.gov (United States)

    A break even analysis based on NPV was conducted to compare picker-based and stripper-based harvest systems with and without field cleaners. Under no conditions analyzed was the NPV of a stripper system without a field cleaner greater than a stripper system with a field cleaner. Break even curves re...

  13. Health physics in fusion reactor design

    International Nuclear Information System (INIS)

    Wong, K.Y.; Dinner, P.J.

    1984-06-01

    Experience in the control of tritium exposures to workers and the public gained through the design and operation of Ontario Hydro's nuclear stations has been applied to fusion projects and to design studies on emerging fusion reactor concepts. Ontario Hydro performance in occupational tritium exposure control and environmental impact is reviewed. Application of tritium control technologies and dose management methodology during facility design is highlighted

  14. Design of an additional heat sink based on natural circulation in pressurized water reactors

    International Nuclear Information System (INIS)

    Frischengruber, Kurt; Solanilla, Roberto; Fernandez, Ricardo; Blumenkrantz, Arnaldo; Castano, Jorge

    1989-01-01

    Residual heat removal through the steam generators in Nuclear Power Plant with pressurized water reactors (PWR) or pressurized heavy water reactors (PHWR in pressured vessel or pressured tube types) requires the maintenance of the steam generator inventory and the availability of and appropriate heat sink, which are based on the operability of the steam generators feedwater system. This paper describes the conceptual design of an assured heat removal system which includes only passive elements and is based on natural circulation. The system can supplement the original systems of the plant. The new system includes a condenser/boiler heat exchanger to condense the steam produced in the steam generator, transferring the heat to the water of an open pool at atmospheric pressure. The condensed steam flows back to the steam generators by natural circulation effects. The performance of an Atucha type PHWR nuclear power station with and without the proposed system is calculated in an emergency power case for the first 5000 seconds after the incident. The analysis shows that the proposed system offers the possibility to cool-down the plant to a low energy state during several hours and avoids the repeated actuation of the primary and secondary system safety valves. (Author) [es

  15. Pulse picker for synchrotron radiation driven by a surface acoustic wave.

    Science.gov (United States)

    Vadilonga, Simone; Zizak, Ivo; Roshchupkin, Dmitry; Petsiuk, Andrei; Dolbnya, Igor; Sawhney, Kawal; Erko, Alexei

    2017-05-15

    A functional test for a pulse picker for synchrotron radiation was performed at Diamond Light Source. The purpose of a pulse picker is to select which pulse from the synchrotron hybrid-mode bunch pattern reaches the experiment. In the present work, the Bragg reflection on a Si/B4C multilayer was modified using surface acoustic wave (SAW) trains. Diffraction on the SAW alters the direction of the x rays and it can be used to modulate the intensity of the x rays that reach the experimental chamber. Using electronic modulation of the SAW amplitude, it is possible to obtain different scattering conditions for different x-ray pulses. To isolate the single bunch, the state of the SAW must be changed in the short time gap between the pulses. To achieve the necessary time resolution, the measurements have been performed in conical diffraction geometry. The achieved time resolution was 120 ns.

  16. Fuel deposits, chemistry and CANDU reactor operation

    International Nuclear Information System (INIS)

    Roberts, J.G.

    2013-01-01

    'Hot conditioning' is a process which occurs as part of commissioning and initial start-up of each CANDU reactor, the first being the Nuclear Power Demonstration-2 reactor (NPD). Later, understanding of the cause of the failure of the Pickering Unit 1 G16 fuel channel led to a revised approach to 'hot conditioning', initially demonstrated on Bruce Unit 5, and subsequently utilized for each CANDU unit since. The difference being that during 'hot conditioning' of CANDU heat transport systems fuel was not in-core until Bruce Unit 5. The 'hot conditioning' processes will be briefly described along with the consequences to fuel. (author)

  17. Pipe support program at Pickering

    International Nuclear Information System (INIS)

    Sahazizian, L.A.; Jazic, Z.

    1997-01-01

    This paper describes the pipe support program at Pickering. The program addresses the highest priority in operating nuclear generating stations, safety. We present the need: safety, the process: managed and strategic, and the result: assurance of critical piping integrity. In the past, surveillance programs periodically inspected some systems, equipment, and individual components. This comprehensive program is based on a managed process that assesses risk to identify critical piping systems and supports and to develop a strategy for surveillance and maintenance. The strategy addresses all critical piping supports. Successful implementation of the program has provided assurance of critical piping and support integrity and has contributed to decreasing probability of pipe failure, reducing risk to worker and public safety, improving configuration management, and reducing probability of production losses. (author)

  18. Design of shutdown system no.2 liquid poison injection system for 500 MWe PHWR

    International Nuclear Information System (INIS)

    Bhatnagar, S.; Balasubrahmanian, A.K.; Pillai, A.V.

    1997-01-01

    Defence in depth and two group system concepts form the basic design philosophy for the shutdown systems. There are two independent, diverse and fast acting shutdown systems provided for the 500 MWe PHWR. The design is based on fail-safe principle, sufficient component redundancy and on-line testing. Liquid poison injection system, as shutdown system 2, is newly developed for the 500 MWe PHWRs. The system operates by rapidly injecting gadolinium nitrate solution into bulk moderator using stored helium pressure thereby inserting negative reactivity. A high pressure helium supply tank which provides the energy for system actuation, is connected, through an array of fast acting valves in series-parallel arrangement, to the individual poison tanks storing gadolinium nitrate solution. The valves, belonging to three different channels of reactor Protection System 2, are the only active components in the system. The valves are fail safe and are periodically tested on-line without actually firing the system. The system comprising of in-core assemblies and the external process system has been engineered. Experimental work is being carried out by BARC for design validation and data generation. This paper describes the conceptual development, design basis, design parameters and detailed engineering of the system. (author)

  19. Main coolant pump testing at Ontario Hydro

    International Nuclear Information System (INIS)

    Hartlen, R.

    1991-01-01

    This article describes Ontario Hydro Research Division's experience with a computerized data acquisition and analysis system for monitoring mechanical vibration in reactor coolant pumps. The topics covered include bench-marking of the computer system and the coolant pumps, signatures of normal and malfunctioning pumps, analysis of data collected by the monitoring system, simulation of faults, and concerns that have been expressed about data interpretation, sensor types and locations, alarm/shutdown limits and confirmation of nondestructive examination testing. This presentation consists of overheads only

  20. Aspects on optimization of natural uranium fuel utilization in heavy water reactors

    International Nuclear Information System (INIS)

    1978-08-01

    This paper is dealing with a possibility to decrease the natural uranium consumption of CANDU PHWR using the once-through cycle. This possibility is based on the utilization of slightly enriched uranium. The optimal two-zone structure of a reactor using natural uranium is found out. The optimal criterium is the maximization of the burnup (equivalent to minimization of uranium requirements) with a constraint on power density radial uniformity factor. As regards the enriched uranium, the optimal enrichment and the two-zone structure of a reactor which minimizes the natural uranium requirement with constraints on uniformity factor and maximum burnup are established. Corresponding to a maximum burnup of 16,000 MWd/t and 1% enrichment, the natural uranium requirement is found to be 10% less than that of the natural uranium reactor

  1. Reactivity requirements and safety systems for heavy water reactors

    International Nuclear Information System (INIS)

    Kati, S.L.; Rustagi, R.S.

    1977-01-01

    The natural uranium fuelled pressurised heavy water reactors are currently being installed in India. In the design of nuclear reactors, adequate attention has to be given to the safety systems. In recent years, several design modifications having bearing on safety, in the reactor processes, protective and containment systems have been made. These have resulted either from new trends in safety and reliability standards or as a result of feed-back from operating reactors of this type. The significant areas of modifications that have been introduced in the design of Indian PHWR's are: sophisticated theoretical modelling of reactor accidents, reactivity control, two independent fast acting systems, full double containment and improved post-accident depressurisation and building clean-up. This paper brings out the evolution of design of safety systems for heavy water reactors. A short review of safety systems which have been used in different heavy water reactors, of varying sizes, has been made. In particular, the safety systems selected for the latest 235 MWe twin reactor unit station in Narora, in Northern India, have been discussed in detail. Research and Development efforts made in this connection are discussed. The experience of design and operation of the systems in Rajasthan and Kalpakkam reactors has also been outlined

  2. Ontario hydro development program for steam generator waterlancing applications

    International Nuclear Information System (INIS)

    Malaugh, J.

    1992-01-01

    In the early 1980s, Ontario Hydro's main focus on waterlancing applications was in the development of technology for cleaning tubesheet sludge piles. In 1988, when Unit 2 at the Bruce Nuclear Generating Station (BNGS) was derated to 70% of full power due to severely blocked broach plates, high pressure waterlancing was proposed as a short-term solution. Due to the tight geometry that exist in the BNGS SGs (Steam Generator), an innovative approach was needed to deliver high pressure water to the broach hole locations. The initial lances and guides were modelled after a fiber-optic inspection system used for visual measurements of the broach openings. The waterlancing technology that was first developed for cleaning BNGS Unit 2 has evolved considerably since 1988. Both Units 1 and 2 upper broach plates have been successfully cleaned by waterlancing. At Pickering NGS, this technology is being further developed for use in cleaning broach plates and for tubesheet sludge lancing. This paper describes the development of the waterlance from the initial low pressure stainless steel lances to the current high pressure 'kevlar' lances. The major advances in this technology were borne out of a need to overcome the challenges presented by the SG geometry restrictions and the tenacity of the deposits that were encountered

  3. Thermal-hydraulic interfacing code modules for CANDU reactors

    Energy Technology Data Exchange (ETDEWEB)

    Liu, W.S.; Gold, M.; Sills, H. [Ontario Hydro Nuclear, Toronto (Canada)] [and others

    1997-07-01

    The approach for CANDU reactor safety analysis in Ontario Hydro Nuclear (OHN) and Atomic Energy of Canada Limited (AECL) is presented. Reflecting the unique characteristics of CANDU reactors, the procedure of coupling the thermal-hydraulics, reactor physics and fuel channel/element codes in the safety analysis is described. The experience generated in the Canadian nuclear industry may be useful to other types of reactors in the areas of reactor safety analysis.

  4. Thermal-hydraulic interfacing code modules for CANDU reactors

    International Nuclear Information System (INIS)

    Liu, W.S.; Gold, M.; Sills, H.

    1997-01-01

    The approach for CANDU reactor safety analysis in Ontario Hydro Nuclear (OHN) and Atomic Energy of Canada Limited (AECL) is presented. Reflecting the unique characteristics of CANDU reactors, the procedure of coupling the thermal-hydraulics, reactor physics and fuel channel/element codes in the safety analysis is described. The experience generated in the Canadian nuclear industry may be useful to other types of reactors in the areas of reactor safety analysis

  5. Theoretical and experimental investigations into natural circulation behaviour in a simulated facility of the Indian PHWR under reduced inventory conditions

    International Nuclear Information System (INIS)

    Satish Kumar, N.V.; Nayak, A.K.; Vijayan, P.K.; Pal, A.K.; Saha, D.; Sinha, R.K.

    2004-01-01

    A theoretical and experimental investigation has been carried out to study natural circulation characteristics of an Indian PHWR under reduced inventory conditions. The theoretical model incorporates a quasi-steady state analysis of natural circulation at different system inventories. It predicts the system flow rate under single-phase and two-phase conditions and the inventory at which reflux condensation occurs. The model predictions were compared with test data obtained from FISBE (facility for integral system behaviour experiments), which simulates the thermal hydraulic behaviour of the Indian 220 MWe PHWR. The experimental results were found to be in close agreement with the predictions. It was also found that the natural circulation could be oscillatory under reduced inventory conditions. (orig.)

  6. Acoustic emission technique for leak detection in an end shield of a pressurized heavy water reactor

    International Nuclear Information System (INIS)

    Kalyanasundaram, P.; Jayakumar, T.; Raj, B.

    1989-01-01

    This paper discusses the successful application of the Acoustic Emission Technique (AET) for detection and location of leak paths present on the inaccessible side of an end shield of a Pressurized Heavy Water Reactor (PHWR). The methodology was based on the fact that air and water leak AE signals have different characteristic features. Baseline data was generated from a sound end-shield of a PHWR for characterizing the background noise. A mock up end-shield system with saw cut leak paths was used to verify the validity of the methodology. It was found that air leak signals under pressurisation (as low as 3 psi) could be detected by frequency domain analysis. Signals due to air leaks from various locations of a defective end-shield were acquired and analysed. It was possible to detect and locate leak paths. Presence of detected leak paths were further confirmed by alternate test. (orig.)

  7. Development of a diagnostic system for identifying accident conditions in a reactor

    International Nuclear Information System (INIS)

    Santhosh; Gera, B.; Kumar, Mithilesh; Thangamani, I.; Prasad, Hari; Srivastava, A.; Dutta, Anu; Sharma, Pavan K.; Majumdar, P.; Verma, V.; Mukhopadhyay, D.; Ganju, Sunil; Chatterjee, B.; Sanyasi Rao, V.V.S.; Lele, H.G.; Ghosh, A.K.

    2009-07-01

    This report describes a methodology for identification of accident conditions in a nuclear reactor from the signals available to the operator. A large database of such signals is generated through analyses - for core, containment, environmental dispersion and radiological dose to train a computer code based on an Artificial Neural Networks (ANNs). At present, in the prediction mode, information on LOCA (location and size of break), status of availability of ECCS, and expected doses can be predicted well for a 220 MWe PHWR. (author)

  8. The fuel string relocation effect - why the Bruce reactors were derated

    Energy Technology Data Exchange (ETDEWEB)

    Gold, M; Farooqui, M Z; Adebiyi, A S; Chu, R Y; Le, N T; Oliva, A F [Ontario Hydro, Toronto, ON (Canada); Balog, G; Qu, T; DeBuda, P G [Ontario Hydro, Tiverton, ON (Canada). Bruce Nuclear Generating Station-A

    1996-12-31

    In the CANDU Safety Analysis process, a series of design basis accidents are chosen and analyzed to confirm safety system effectiveness. Of all the postulated accidents, the Large Break Loss of Coolant Accident (LBLOCA) - a postulated break in the Heat Transport System piping near a component that services a large number of fuel channels - sets the most demanding requirements on the speed and reactivity depth of the shutdown system devices - shutoff rods and liquid poison injection. While the event is extremely improbable, it is reanalyzed periodically and its consequences examined to ensure continued shutdown system effectiveness. In March 1993, an additional effect was identified: if the break occurred in the piping on the inlet side of the core, this would cause sudden movement of the fuel bundles (so-called fuel string relocation) in a large number of channels. In Ontario Hydro`s Bruce NGS A, Bruce NGS B and Darlington reactors, each channel is fuelled against the flow. In this situation, the relocation of the fuel string results in a sudden positive reactivity increase. This reactivity increase is in addition to the reactivity due to the core coolant voiding. The combined reactivity effect could lead to power pulses much higher than those that would arise due to coolant voiding alone. To maintain safety margins in the event of such a postulated accident, the eight Bruce NGS A and Bruce NGS B units were initially derated to 60 percent power within 2 days of the identification and confirmation of this effect. This paper: describes the fuel string relocation phenomenon in detail; explains why the consequences differ at the various Ontario Hydro reactors; outlines the actions taken with respect to each of the Ontario Hydro reactors in the months following March 1993; describes the design solutions implemented to mitigate the problem and return the Bruce reactors to higher powers. 6 refs., 1 tab., 6 figs.

  9. Automatic pickers performances in the case of the Emilia sequence of May-June 2012.

    Science.gov (United States)

    Tiberi, Lara; Spallarossa, Daniele; Costa, Giovanni

    2013-04-01

    The automatic processing of seismic data, whether for real-time seismic warning system or to reprocessing large amount of seismic recordings, is increasingly being demanded by seismologists especially in case of emergency as for the Emilia sequence in may-june 2012. In this study is presented a comparison between the AutoPicker (DipTeRiS, University of Genova) a new method used for automatic accurate onset phase picking for both P and S wave arrival based on the Akaike's information criterion (AIC), a solid and tested picker as the STA/LTA in Antelope software and the manual pickings. In order to construct the database used for the relocation of Emilia sequence, the RAN strong motion database has been merged with the available velocity and acceleration data extracted from the EIDA database (European Integrated Data Archive) and velocity data recorded by the Southeastern Alps Integrated Network (DMG, OGS, ARSO and ZAMG). The fault system of the Emilia earthquake area is complex and it is not easy to assess which fault has moved. A precise localization of the sequence is essential. The manual pickings, the equivalent locations and the choice of the most appropriate velocity model ("Iside") used in this study are the results of a work done in collaboration with Università di Chieti and DPC, not described here. The main problem of the AutoPicker and Antelope software is to discriminate events that occur very close to each other in time. The best way to solve that issue is choosing the best setup of both techniques to minimize the problem. Then we would like to implement the AutoPicker technique developed by Prof. Spallarossa on the Antelope system routinely used by UTS-DMG for the real-time data analysis.

  10. A Study of Micro Finance: Special Reference to Female Waste Pickers in Pimpri Chinchwad Area in Pune

    OpenAIRE

    Hebalkar, Dr. Rashmi; Sharma, Meena Sunildutt

    2013-01-01

    Female waste pickers are the neglected section of urban women who are struggling to make ends meet, in an occupation which is hazardous for health, and are contributing to the welfare of society, without realizing it, through collecting waste and sending it forward for recycling. These women may be poorly educated but at least some of them have been unionized and their union attempts to improve their condition. Despite the existence of KKPKP union, there are female waste pickers who have not ...

  11. Tritium releases from the Pickering Nuclear Generating Station and birth defects and infant mortality in nearby communities 1971-1988

    International Nuclear Information System (INIS)

    Johnson, K.C.; Rouleau, J.

    1991-10-01

    This study was commissioned to examine whether there were elevated rates of stillbirth, birth defects, or death in the first year of life between 1971 and 1988 among offspring of residents of communities within a 25-kilometre radius of the Pickering Nuclear Generating Station. The study was also to investigate whether there were any statistical associations between the monthly airborne or waterborne tritium emissions from the Pickering Nuclear Generating Station and the rates of these reproductive outcomes. Overall analysis did not support a hypothesis of increased rates of stillbirths, neonatal mortality or infant mortality near the Pickering Nuclear Generating Station, or a hypothesis of increased birth prevalence of birth defects for 21 of 22 diagnostic categories. The prevalence of Down Syndrome was elevated in both Pickering and Ajax; however, there was no consistent pattern between tritium release levels and Down Syndrome prevalence, chance could not be ruled out for the associations between Down Syndrome and tritium releases or ground-monitored concentrations, the association was detected in an analysis where multiple testing was done which may turn up significant associations by change, and maternal residence at birth and early in pregnancy needs to be verified. The association between Down Syndrome and low-level radiation remains indeterminate when existing evidence from epidemiological studies is summed. The estimated radiation exposure from the nuclear plant for residents of Pickering and Ajax is lower by a factor of 100 than the normal natural background radiation. Further study is recommended. (21 tabs., 29 figs., 5 maps, 37 refs.)

  12. The interaction between popular economy, social movements and public policies: A case study of the waste pickers' movement

    OpenAIRE

    van Zeeland, Angelique J.W.M.

    2014-01-01

    This paper examines the challenges of expansion and sustainability of Social and Solidarity Economy (SSE). It focuses on the interaction between popular economy and SSE, and stresses the importance of collective action and public policies to enable the transition from the informal economy toward SSE. The main focus is on the waste pickers' movement. Experiences from Latin America, Asia and Africa show the possibilities of incorporating a significant contingent of informal waste pickers in sol...

  13. Engineered safety in development of liquid poison injection system (shut down system-2) for 500 MWe PHWR

    International Nuclear Information System (INIS)

    Sapra, M.K.; Kundu, S.N.; Mohan, L.R.

    2002-01-01

    Full text: The provision of shut down systems (SDS) is a mandatory requirement for safety of any nuclear reactor. The SDS shall be capable of making and holding the core adequately subcritical in the event of any anticipated operational occurrence and postulated accident conditions. The shut down function will perform as intended when its design and components are thoroughly evaluated for their reliability and effectiveness. A full scale mock up for one injection unit was designed and developed at Hall No.7, BARC. Experimental studies were carried out to qualify the design and evolve process parameters such as gas tank pressure, poison discharge rate and poison injection time. In liquid poison injection system i.e. shutdown system -2, there is no physical barrier, between the two liquids i.e. the poison and the moderator. A liquid in liquid interface, called poison moderator interface (PMI) separates these fluids. Extensive lab scale studies have been carried out on PMI movement study i.e. the interface movement due to molecular diffusion and due to process disturbances under simulated reactor condition. On the basis of lab scale results, a full-scale PMI setup has been designed and developed to generate plant data. From reactor safety consideration, the floating ball in poison tank is designed in such a way that it prevents the over pressurisation of calandria. For this purpose a non-intrusive ultrasonic ball detection system (U-BDS) has been developed. This paper covers the PMI system for 500 MWe PHWR with relevant safety aspects and describes in detail, the experimental results of PMI study. The engineered safety in design, methodology and qualification of U-BDS and its role intended in performance of SDS-2 have been also discussed in the paper

  14. Effect of Flow Configuration on Velocity and Temperature Distribution of Moderator Inside 540 MWe PHWR Calandria using CFD Techniques

    International Nuclear Information System (INIS)

    Bharj, J.S.; Sahaya, R.R.; Datta, D.; Dharne, S.P.

    2006-01-01

    The calandria of a Pressurized Heavy Water Reactor (PHWR) is a horizontal cylindrical vessel housing a matrix of horizontal tubes called calandria tubes, through which pass the pressure tubes that house the fuel bundles. The calandria is filled with heavy water acting as moderator. A large amount of heat (about 95 MW) is generated within the moderator mainly due to neutron slowing down and attenuation of gamma radiations. In the present configuration of 540 MWe calandria, moderator inlet diffusers are directed upwards and the outlet is from the bottom of the calandria. This configuration is not conducive for the buoyancy-dominated flows generated due to large volumetric heat generation in the moderator. In order to decide the effects of changes in flow configuration by changing location/direction of inlet/outlet nozzles, a study was done for moderator flows in the using PHOENICS CFD software. The results of study with various flow configurations show that modification in moderator flow configuration, reduces the peak temperature of moderator in calandria by about 12 deg C as well as gives a much more uniform temperature distribution. (authors)

  15. Probability safety assessment activities in India for new and advanced reactors

    International Nuclear Information System (INIS)

    Guptan, R.; Ghagde, S.G.; Nama, R.; Varde, P.V.; Vinod, G.; Arul, J.; Solanki, R.B.

    2012-01-01

    This paper discusses, in brief, the salient features of the Level 1 PSA for New and Advanced reactors in India. The features of Level 1 PSA for new reactors are being discussed through a case study of 540 MWe twin unit (comprises of Unit 3 and 4) PHWRs at TAPS. The reactors uses Heavy water moderator and pressurized heavy water coolant, natural uranium fuel and horizontal pressure tubes. The major feature of PSA of advanced reactors is also discussed through the specific issues that were encountered during PSA modeling of AHWR (Advanced Heavy Water Reactor) and 700 MWe PHWR. The results of the PSA indicate that a fairly high level of redundancies exists in TAPS-3 and -4 design. It is recommended that staggered testing philosophy should be adopted especially for Emergency Core Cooling System, to reduce the probability of common cause failure among the motorized valves. It is also recommended to emphasize the importance of Small Break LOCA in general and their consequences in the licensing process of the plant operators

  16. Burnup calculation of a CANDU6 reactor using the Serpent and MCNP6 codes

    Energy Technology Data Exchange (ETDEWEB)

    Hussein, M.S.; Bonin, H.W., E-mail: mohamed.hussein@rmc.ca, E-mail: bonin-h@rmc.ca [Royal Military College of Canada, Dept. of Chemistry and Chemical Engineering, Kingston, ON (Canada); Lewis, B.J., E-mail: Brent.Lewis@uoit.ca [Univ. of Ontario Inst. of Tech., Faculty of Energy Systems and Nuclear Science, Oshawa, ON (Canada)

    2014-07-01

    A study of fuel burnup for the CANDU6 reactor is carried out to validate the most recent versions of the probabilistic transport code (MCNP6) and the continuous energy burnup calculation code (Serpent). These two codes allow for 3-D geometry calculation accounting for a detailed analysis without unit-cell homogenization. On the other hand, the WIMS-AECL computer program is used to model neutron transport in nuclear-reactor lattices for design, safety analysis, and operation. It works with two-dimensional regions and can perform collision probability calculations for a periodic structure of the lattice cell. In the present work, the multiplication factor, the total flux and fuel burnup could be calculated for a CANDU6 nuclear reactor based on the GENTILLY-2 core design. The MCNP6 and Serpent codes provide a calculation of the track length estimated flux per neutron source. This estimated flux is then scaled with normalization to the reactor power in order to provide a flux in unit of n/cm{sup 2}s. Good agreement is observed between the actual total flux calculated by MCNP6, Serpent and WIMS-AECL. The effective multiplication factors of the whole core CANDU6 reactor are further calculated as a function of burnup and further compared to those calculated by WIMS-AECL where excellent agreement is also obtained. (author)

  17. Burnup calculation of a CANDU6 reactor using the Serpent and MCNP6 codes

    International Nuclear Information System (INIS)

    Hussein, M.S.; Bonin, H.W.; Lewis, B.J.

    2014-01-01

    A study of fuel burnup for the CANDU6 reactor is carried out to validate the most recent versions of the probabilistic transport code (MCNP6) and the continuous energy burnup calculation code (Serpent). These two codes allow for 3-D geometry calculation accounting for a detailed analysis without unit-cell homogenization. On the other hand, the WIMS-AECL computer program is used to model neutron transport in nuclear-reactor lattices for design, safety analysis, and operation. It works with two-dimensional regions and can perform collision probability calculations for a periodic structure of the lattice cell. In the present work, the multiplication factor, the total flux and fuel burnup could be calculated for a CANDU6 nuclear reactor based on the GENTILLY-2 core design. The MCNP6 and Serpent codes provide a calculation of the track length estimated flux per neutron source. This estimated flux is then scaled with normalization to the reactor power in order to provide a flux in unit of n/cm 2 s. Good agreement is observed between the actual total flux calculated by MCNP6, Serpent and WIMS-AECL. The effective multiplication factors of the whole core CANDU6 reactor are further calculated as a function of burnup and further compared to those calculated by WIMS-AECL where excellent agreement is also obtained. (author)

  18. Annual progress report for 1982 of Theoretical Reactor Physics Section

    International Nuclear Information System (INIS)

    Rastogi, B.P.; Kumar, Vinod

    1983-01-01

    The progress of work done in the Theoretical Reactor Physics Section of the Bhabha Atomic Research Centre, Bombay, during the calendar year 1982 is reported in the form of write-ups and summaries. The main thrust of the work has been to master the neutronic design technology of four different types of nuclear reactor types, namely, pressurized heavy water reactors, boiling light water reactors, pressurized light water reactors and fast breeder reactors. The development work for the neutronic analysis, fuel design, and fuel management of the BWR type reactors of the Tarapur Atomic Power Station has been completed. A new reactor simulator system for PHWR design analysis and core follow-up was completed. Three dimensional static analysis codes based on nodal and finite element methods for the design work of larger size (500-750 MWe) reactors have been developed. Space link kinetics codes in one, two and three dimensions for above-mentioned reactor systems have been written and validated. Fast reactor core disruptive analysis codes have been developed. In the course of R and D work concerning various types of reactor projects, investigations were also carried in the allied areas of Monte Carlo techniques, integral transform methods, path integral methods, high spin states in heavy nuclei and a hydrodynamics model for a laser driven fusion system. (M.G.B.)

  19. Full length channel Pressure Tube sagging under completely voided full length pressure tube of an Indian PHWR

    Energy Technology Data Exchange (ETDEWEB)

    Negi, Sujay, E-mail: negi.sujay@gmail.com [Indian Institute of Technology, Roorkee 247667 (India); Kumar, Ravi, E-mail: ravikfme@gmail.com [Indian Institute of Technology, Roorkee 247667 (India); Majumdar, P., E-mail: pmajum@barc.gov.in [Bhabha Atomic Research Centre, Mumbai 400085 (India); Mukopadhyay, D., E-mail: dmukho@barc.gov.in [Bhabha Atomic Research Centre, Mumbai 400085 (India)

    2017-03-15

    Highlights: • At 16 kW/m input, thermal stability was attained at 595 °C, without PT-CT contact. • At 20 kW/m step input, PT-CT contact occurred at 637 °C near bottom-center of the tube. • PT integrity was maintained throughout the experiment. - Abstract: An experimental investigation was conducted to simulate the sagging behavior of a full length Pressure Tube of a channel of 220 MWe Indian PHWR. The investigation aimed to recreate a condition resembling Loss of Coolant Accident (LOCA) with Emergency Core Cooling System (ECCS) failure in a nuclear power plant. A full length channel assembly immersed in moderator was subjected to electrical resistance heating of Pressure Tube (PT) to simulate the residual heat after shutting down of reactor. The temperature of PT started rising and the contact between PT and CT was established at the center of the tube where average bottom temperature was 637 °C. The integrity of PT was maintained throughout the experiment and the PT heat up was arrested on contact with the CT due to transfer of heat to the moderator.

  20. Construction management of Indian pressurized heavy water reactors

    International Nuclear Information System (INIS)

    Bohra, S.A.; Sharma, P.D.

    2006-01-01

    Pandit Jawaharlal Nehru and Dr. Homi J. Bhabha, the visionary architects of Science and Technology of modern India foresaw the imperative need to establish a firm base for indigenous research and development in the field of nuclear electricity generation. The initial phase has primarily focused on the technology development in a systematic and structured manner, which has resulted in establishment of strong engineering, manufacturing and construction base. The nuclear power program started with the setting up of two units of boiling light water type reactors in 1969 for speedy establishment of nuclear technology, safety culture, and development of operation and maintenance manpower. The main aim at that stage was to demonstrate (to ourselves, and indeed to the rest of the world) that India, inspite of being a developing country, with limited industrial infrastructure and low capacity power grids, could successfully assimilate the high technology involved in the safe and economical operation of nuclear power reactors. The selection of a BWR was in contrast to the pressurized heavy water reactors (PHWR), which was identified as the flagship for the first stage of India's nuclear power program. The long-term program in three stages utilizes large reserves of thorium in the monazite sands of Kerala beaches in the third stage with first stage comprising of series of PHWR type plants with a base of 10,000 MW. India has at present 14 reactors in operation 12 of these being of PHWR type. The performance of operating units of 2720 MW has improved significantly with an overall capacity factor of about 90% in recent times. The construction work on eight reactor units with installed capacity of 3960 MW (two PHWRs of 540 MW each, four PHWRs of 220 MW each and two VVERs of 1000 MW each) is proceeding on a rapid pace with project schedules of less than 5 years from first pour of concrete. This is being achieved through advanced construction technology and management. Present

  1. Determination of overall decontamination factors for common impurity elements in PHWR spent fuel reprocessing

    International Nuclear Information System (INIS)

    Pant, D.K.; Bhalerao, B.A.; Gupta, K.K.; Kulkarni, P.G.; Gurba, P.B.; Janardan, P.; Changrani, R.D.; Dey, P.K.

    2009-01-01

    An attempt has been made to determine overall decontamination factors for elemental impurities normally encountered in the U 3 O 8 product obtained by reprocessing of PHWR spent fuel. The solution obtained by dissolution of spent fuel and corresponding U 3 O 8 product were analyzed for 24 elemental impurities by ICP-AES for this purpose. Decontamination factors achieved for major neutron poisons are in the range of 200-400. (author)

  2. System dynamics applied to closed loop supply chains of desktops and laptops in Brazil: A perspective for social inclusion of waste pickers.

    Science.gov (United States)

    Ghisolfi, Verônica; Diniz Chaves, Gisele de Lorena; Ribeiro Siman, Renato; Xavier, Lúcia Helena

    2017-02-01

    The structure of reverse logistics for waste electrical and electronic equipment (WEEE) is essential to minimize the impacts of their improper disposal. In this context, the Brazilian Solid Waste Policy (BSWP) was a regulatory milestone in Brazil, submitting WEEE to the mandatory implementation of reverse logistics systems, involving the integration of waste pickers on the shared responsibility for the life cycle of products. This article aims to measure the impact of such legal incentives and the bargaining power obtained by the volume of collected waste on the effective formalization of waste pickers. The proposed model evaluates the sustainability of supply chains in terms of the use of raw materials due to disposal fees, collection, recycling and return of some materials from desktops and laptops using system dynamics methodology. The results show that even in the absence of bargaining power, the formalization of waste pickers occurs due to legal incentives. It is important to ensure the waste pickers cooperatives access to a minimum amount, which requires a level of protection against unfair competition with companies. Regarding the optimal level of environmental policies, even though the formalization time is long, it is still not enough to guarantee the formalization of waste picker cooperatives, which is dependent on their bargaining power. Steel is the material with the largest decrease in acquisition rate of raw material. Copyright © 2016 Elsevier Ltd. All rights reserved.

  3. Update of the Picker C9 irradiator control system of the gamma II room of the secondary laboratory of dosimetric calibration; Actualizacion del sistema de control del irradiador Picker C9 de la sala gamma II del laboratorio secundario de calibracion dosimetrica

    Energy Technology Data Exchange (ETDEWEB)

    Simon S, L. E.

    2016-07-01

    The Picker C9 irradiator is responsible for the calibration of different radiological equipment and the control system that maintains it in operation is designed in the graphical programming software LabVIEW (Laboratory Virtual Instrumentation Engineering Workbench), being its major advantages: the different types of communication, easy interconnection with other software and the recognition of different hardware devices, among others. Operation of the irradiator control system is performed with the NI-Usb-6008 (DAQ) data acquisition module of the National Instruments Company. The purpose of this work is to update the routines that make the Picker C9 control system of the gamma II room of the secondary laboratory of dosimetric calibration, using the graphic programming software LabVIEW, as well as to configure the new acquisition hardware of data that is implemented to control the Picker C9 irradiator system and ensure its operation. (Author)

  4. Assessing the financial positions of Ontario`s new electricity companies

    Energy Technology Data Exchange (ETDEWEB)

    Connell, T. [Standard and Poor`s, Toronto, ON (Canada)

    1999-11-01

    This paper describes the methodology, including the criteria factors, comparable ratings and key credit issues used in assessing the financial positions of Ontario Power Generation Inc., and the Ontario Hydro Services Company. The rating criteria factors include both business factors (such as ownership structure, regulation, service area, operations, management, etc.,) and financial factors (e.g. financial policies and guidelines, recent financial performance, margin analysis, capital structure and borrowing plans, financial projections and sensitivities). Key credit issues include considerations of competitive dynamics, nuclear portfolio performance (for Genco), regulatory changes, cost control, capital spending program, retail business exposure, future financial performance. Comparisons are made with corresponding positions of comparable entities in Australia, Finland, New Zealand, the UK, and the USA. In the case of Ontario Power Generation Inc., the company is assessed to have significant advantages initially, but various uncertainties over the medium term warrant a more cautious view of the credit profile. For the Ontario Hydro Services Company the business risks appear to be low and moderate leverage entails a strong, stable credit profile. The overall assessment of the two companies is that while certain questions such as the workability and credibility of the new industry structure, the problem of stranded debt and questions about the liquidity of market participants remain unsolved, Ontario Power Generation Inc., and the Ontario Hydro Services Company ratings compare favorably with ratings of global industry peers.

  5. The Sensitivity Analysis of Axial Pressure Tube Creep Profile for Dryout Power in PHWR

    Energy Technology Data Exchange (ETDEWEB)

    Ryu, Euiseung; Kim, Youngae [KHNP CRI, Daejeon (Korea, Republic of)

    2016-10-15

    The Stern Laboratory performed the CHF tests with only one axial pressure tube creep profile per 3.3%, 5.1% peak crept channel and made CHF correlation including creep factor from the CHF test results. Wolsong nuclear power plants also have utilized the same CHF correlation derived by CNL. Pressure tube diameter creep rate is function of fast neutron, coolant temperature, and coolant pressure in a channel. It means that various axial pressure tube creep profiles exist in PHWR due to the history of operating conditions. Usually, CHF correlation is used during ROP(Regional Overpower Protection) Trip Setpoint Analysis or Safety Analysis in PHWR. The sensitivity analysis for CHF effects using various creep profiles is needed. This paper summarizes the comparison results of dryout power between CHF test creep profile and estimated creep profiles of Wolsong units. The effect of axial pressure tube creep profile for dryout power in fuel channel is evaluated by using Stern Lab. CHF test creep profile and 380 channel creep profiles of Wolsong. The dryout powers at 3.3% and 5.1% test conditions are slightly smaller when using 380 Wolsong channels creep profiles. These also show that the simulated dryout powers maintain consistency regardless of flow conditions.

  6. Ontario energy review

    International Nuclear Information System (INIS)

    1990-03-01

    This publication provides a review of the developments in Ontario in relation to the national and international energy scene. Ontario is the largest energy consumer in Canada and is highly dependent on external energy sources. Several developments have significantly altered the Ontario energy scene. Oil and gas markets have become deregulated and market forces increasingly determine prices. A free trade agreement with the United States makes Ontario even more affected by international markets. Oil and gas prices have fallen from the high levels of the 1980s, but energy efficiency and conservation continue to be extremely important because they affect economic performance and the environment. In the next few years the greatest challenges will be to continue improving energy efficiency, to reduce the impact of energy on the environment, and to ensure the availability of sufficient energy supplies for future needs. This review contains statistics on energy in Ontario and explains them for the non-specialist. (7 tabs., figs.)

  7. Seismic response of the Pickering pressure relief duct to the 1985 Nahanni earthquake

    International Nuclear Information System (INIS)

    Ghobarah, A.

    1995-05-01

    The objective of this study is to examine the structural response of the Pickering pressure relief duct when subjected to the ground motion records of the 1985 Nahanni earthquake (December 23, 05:16 GMT, Site 1 - Iverson, N.W.T.). It also includes an estimate of the possible impact on the nuclear safety function of the duct. The structural models developed in an earlier study were used in this analysis. The response to the earthquake ground motion was determined on the basis of the estimated capacities of various components of the duct. The ability of the structure to fulfill its nuclear safety function is discussed. (author). 6 refs., 1 tab., 17 figs

  8. Recent fuel handling experience in Canada

    International Nuclear Information System (INIS)

    Welch, A.C.

    1991-01-01

    For many years, good operation of the fuel handling system at Ontario Hydro's nuclear stations has been taken for granted with the unavailability of the station arising from fuel handling system-related problems usually contributing less than one percent of the total unavailability of the stations. While the situation at the newer Hydro stations continues generally to be good (with the specific exception of some units at Pickering B) some specific and some general problems have caused significant loss of availability at the older plants (Pickering A and Bruce A). Generally the experience at the 600 MWe units in Canada has also continued to be good with Point Lepreau leading the world in availability. As a result of working to correct identified deficiencies, there were some changes for the better as some items of equipment that were a chronic source of trouble were replaced with improved components. In addition, the fuel handling system has been used three times as a delivery system for large-scale non destructive examination of the pressure tubes, twice at Bruce and once at Pickering and performing these inspections this way has saved many days of reactor downtime. Under COG there are several programs to develop improved versions of some of the main assemblies of the fuelling machine head. This paper will generally cover the events relating to Pickering in more detail but will describe the problems with the Bruce Fuelling Machine Bridges since the 600 MW 1P stations have a bridge drive arrangement that is somewhat similar to Bruce

  9. Operating experiences of reactor shutdown system at MAPS

    International Nuclear Information System (INIS)

    Kotteeswaran, T.J.; Subramani, V.A.; Hariharan, K.

    1997-01-01

    The reactors in Madras Atomic Power Station (MAPS), Kalpakkam are Pressurised Heavy Water Reactors (PHWR) similar to RAPS, Kota. The moderator heavy water is pumped into the calandria from dump tank to make the reactor critical. Later with the calandria level held constant at 92% FT, the further power changes are being done with the movement of adjuster rods. The moderator is held in calandria by means of helium gas pressure differential between top of calandria and dump tank located below. The shutdown of the reactor is effected by dumping the moderator water to dump tank by fast equalizing of helium gas pressure. In the revised mode of operation of moderator circuit after the moderator inlet manifold failure, the dump timing was observed to be more compared to the normal value. This was investigated and observed to be due to accumulation of D 2 O in the gas space above dump valves, which was affecting the helium equalizing flow. Also some of Indicating Alarm Meters (IAM) in protective system initiating the trip signals have failed in the unsafe mode. They have been modified to avoid the recurrence of the failures. (author)

  10. Supplementary shutdown system of 220 MWe standard PHWR in India

    International Nuclear Information System (INIS)

    Muktibodh, U.C.

    1997-01-01

    The design objective of the shutdown system is to make the reactor subcritical and hold it in that state for an extended period of time. This objective must be realised under all anticipated operational occurrences and postulated abnormal conditions even during most reactive state of the core. PHWR design criteria for shutdown stipulates requirement of two independent diverse and fast acting shutdown systems, either of which acting alone should meet the above objectives. This requirement would normally call for a large number of reactivity mechanism penetrations into the calandria. From the point of view of space availability at the reactivity mechanism area on top of calandria, for the relatively small core of 220 MWe PHWRs, and ease of maintenance realisation of the total worth by either of the shutdown systems acting alone was difficult. To overcome this engineering constraint and at the same time to satisfy the design criteria, a unique approach to meet the reactivity demands for shutdown was adopted. The reactivity requirements of the shutdown consists of fast and slow reactivity changes. For the shutdown system of 220 MWe PHWRs, the approach of realizing fast reactivity changes with dual redundant, diverse, fast acting shutdown systems aided by a slow acting shutdown system to counter delayed reactivity changes was conceived. The supplementary slow acting shutdown system is called upon to act after actuation of either of the two redundant fast acting systems and is referred to as Liquid Poison Injection System (LPIS). The system adds bulk amount of neutron poison (boric acid), equivalent to 45 mk, directly into the moderator through two nozzles in calandria using pneumatic pressure. This paper describes the design of LPIS as envisaged for the standardised 220 MWe PHWRs. (author)

  11. Proceedings of the 6. National Meeting of Reactor Physics and Thermohydraulic

    International Nuclear Information System (INIS)

    1986-01-01

    The proceedings of the 6. National Meeting of Reactor Physics and Thermohydraulic - 6. ENFIR - allow to evaluate the present status of development in reactor physics and thermohydraulic fields. The mathematical models and methods for calculating neutronic of nuclear reactors, safety reactor analysis, measuring methods of neutronic parameters, computerized simulation of accidents, transients and thermohydraulic analysis are presented. (M.C.K.) [pt

  12. Development of an inconel self powered neutron detector for in-core reactor monitoring

    Science.gov (United States)

    Alex, M.; Ghodgaonkar, M. D.

    2007-04-01

    The paper describes the development and testing of an Inconel600 (2 mm diameter×21 cm long) self-powered neutron detector for in-core neutron monitoring. The detector has 3.5 mm overall diameter and 22 cm length and is integrally coupled to a 12 m long mineral insulated cable. The performance of the detector was compared with cobalt and platinum detectors of similar dimensions. Gamma sensitivity measurements performed at the 60Co irradiation facility in 14 MR/h gamma field showed values of -4.4×10 -18 A/R/h/cm (-9.3×10 -24 A/ γ/cm 2-s/cm), -5.2×10 -18 A/R/h/cm (-1.133×10 -23 A/ γ/cm 2-s/cm) and 34×10 -18 A/R/h/cm (7.14×10 -23 A/ γ/cm 2-s/cm) for the Inconel, Co and Pt detectors, respectively. The detectors together with a miniature gamma ion chamber and fission chamber were tested in the in-core Apsara Swimming Pool type reactor. The ion chambers were used to estimate the neutron and gamma fields. With an effective neutron cross-section of 4b, the Inconel detector has a total sensitivity of 6×10 -23 A/nv/cm while the corresponding sensitivities for the platinum and cobalt detectors were 1.69×10 -22 and 2.64×10 -22 A/nv/cm. The linearity of the detector responses at power levels ranging from 100 to 200 kW was within ±5%. The response of the detectors to reactor scram showed that the prompt response of the Inconel detector was 0.95 while it was 0.7 and 0.95 for the platinum and cobalt self-powered detectors, respectively. The detector was also installed in the horizontal flux unit of 540 MW Pressurised Heavy Water Reactor (PHWR). The neutron flux at the detector location was calculated by Triveni code. The detector response was measured from 0.02% to 0.07% of full power and showed good correlation between power level and detector signals. Long-term tests and the dynamic response of the detector to shut down in PHWR are in progress.

  13. Development of an inconel self powered neutron detector for in-core reactor monitoring

    International Nuclear Information System (INIS)

    Alex, M.; Ghodgaonkar, M.D.

    2007-01-01

    The paper describes the development and testing of an Inconel600 (2 mm diameterx21 cm long) self-powered neutron detector for in-core neutron monitoring. The detector has 3.5 mm overall diameter and 22 cm length and is integrally coupled to a 12 m long mineral insulated cable. The performance of the detector was compared with cobalt and platinum detectors of similar dimensions. Gamma sensitivity measurements performed at the 60 Co irradiation facility in 14 MR/h gamma field showed values of -4.4x10 -18 A/R/h/cm (-9.3x10 -24 A/γ/cm 2 -s/cm), -5.2x10 -18 A/R/h/cm (-1.133x10 -23 A/γ/cm 2 -s/cm) and 34x10 -18 A/R/h/cm (7.14x10 -23 A/γ/cm 2 -s/cm) for the Inconel, Co and Pt detectors, respectively. The detectors together with a miniature gamma ion chamber and fission chamber were tested in the in-core Apsara Swimming Pool type reactor. The ion chambers were used to estimate the neutron and gamma fields. With an effective neutron cross-section of 4b, the Inconel detector has a total sensitivity of 6x10 -23 A/nv/cm while the corresponding sensitivities for the platinum and cobalt detectors were 1.69x10 -22 and 2.64x10 -22 A/nv/cm. The linearity of the detector responses at power levels ranging from 100 to 200 kW was within ±5%. The response of the detectors to reactor scram showed that the prompt response of the Inconel detector was 0.95 while it was 0.7 and 0.95 for the platinum and cobalt self-powered detectors, respectively. The detector was also installed in the horizontal flux unit of 540 MW Pressurised Heavy Water Reactor (PHWR). The neutron flux at the detector location was calculated by Triveni code. The detector response was measured from 0.02% to 0.07% of full power and showed good correlation between power level and detector signals. Long-term tests and the dynamic response of the detector to shut down in PHWR are in progress

  14. Schedule and cost reduction of nuclear generating facilities in Ontario study overview

    International Nuclear Information System (INIS)

    Huterer, J.

    1991-01-01

    During the five year period 1985 to 1990, Ontario Hydro conducted a major study with the objective to reduce the cost and construction duration for future nuclear generating facilities in Ontario. This paper reports on the study called Major Projects: Schedule and Cost Reduction Study (SCRS). Ontario Hydro is a public utility with the responsibility for meeting electricity need for the province of Ontario with a population of 9.6 million. In order to adequately address future electricity needs, Ontario Hydro has developed and submitted a demand/supply plan which covers the next 25 years. The SCRS for major projects contributed to this demand/supply plan

  15. Measurement of fission gas release, internal pressure and cladding creep rate in the fuel pins of PHWR bundle of normal discharge burnup

    Energy Technology Data Exchange (ETDEWEB)

    Viswanathan, U.K. [Post Irradiation Examination Division, Bhabha Atomic Research Centre, Trombay, Mumbai 400085 (India); Sah, D.N., E-mail: dnsah@barc.gov.i [Post Irradiation Examination Division, Bhabha Atomic Research Centre, Trombay, Mumbai 400085 (India); Rath, B.N.; Anantharaman, S. [Post Irradiation Examination Division, Bhabha Atomic Research Centre, Trombay, Mumbai 400085 (India)

    2009-08-01

    Fuel pins of a Pressurised Heavy Water Reactor (PHWR) fuel bundle discharged from Narora Atomic Power Station unit no. 1 after attaining a fuel burnup of 7528 MWd/tU have been subjected to two types of studies, namely (i) puncture test to estimate extent of fission gas release and internal pressure in the fuel pin and (ii) localized heating of the irradiated fuel pin to measure the creep rate of the cladding in temperature range 800 deg. C - 900 deg. C. The fission gas release in the fuel pins from the outer ring of the bundle was found to be about 8%. However, only marginal release was found in fuel pins from the middle ring and the central fuel pin. The internal gas pressure in the outer fuel pin was measured to be 0.55 +- 0.05 MPa at room temperature. In-cell isothermal heating of a small portion of the outer fuel pins was carried out at 800 deg. C, 850 deg. C and 900 deg. C for 10 min and the increase in diameter of the fuel pin was measured after heat treatment. Creep rates of the cladding obtained from the measurement of the diameter change of the cladding due to heating at 800 deg. C, 850 deg. C and 900 deg. C were found respectively to be 2.4 x 10{sup -5} s{sup -1}, 24.6 x 10{sup -5} s{sup -1} and 45.6 x 10{sup -5} s{sup -1}.

  16. Enhanced CANDU 6 (EC6): a proven mid-sized reactor with fuel cycle capability

    International Nuclear Information System (INIS)

    Hopwood, J.; Soulard, M.; Hastings, I.J.

    2011-01-01

    Atomic Energy of Canada (AECL) is finalizing development of the Enhanced CANDU 6 (EC6), which incorporates the CANDU 6's well-proven features, and adds enhancements that make the reactor even more safe and easier to operate. The EC6 is the only mid-sized reactor (700 MWe class) with a proven pedigree that meets modern reactor expectations and regulatory standards. It is sized for smaller grids and also has outstanding fuel-cycle capability. Changes are incremental and consistent with the CANDU 6 project approach. The EC6 utilizes modern computers and a distributed control system housed in an advanced control room which, along with automated testing and on-line diagnostics, make the plant easier and safer to operate, with minimal operator intervention. Containment and seismic capability are upgraded to meet modern standards. The first deployment of the EC6 is anticipated in Canada; international markets are also being pursued. AECL is performing a comprehensive review of the EC6 design in the wake of the Fukushima accident, will review lessons learned, and incorporate any necessary improvements into new build design. (author)

  17. Enhanced CANDU 6 (EC6): a proven mid-sized reactor with fuel cycle capability

    International Nuclear Information System (INIS)

    Hopwood, J.; Soulard, M.; Hastings, I.J.

    2011-01-01

    Atomic Energy of Canada (AECL) is finalizing development of the Enhanced CANDU 6 (EC6), which incorporates the CANDU 6's well-proven features, and enhancements that make the reactor even more safe and easier to operate. The EC6 is the only mid-sized reactor (700 MWe class) with a proven pedigree that meets modern reactor expectations and regulatory standards. It is sized for smaller grids and also has outstanding fuel-cycle capability. Changes are incremental and consistent with the CANDU 6 project approach. The EC6 utilizes modern computers and a distributed control system housed in an advanced control room which, along with automated testing and on-line diagnostics, make the plant easier and safer to operate, with minimal operator intervention. Containment and seismic capability are upgraded to meet modern standards. The first deployment of the EC6 is anticipated in Canada; international markets are also being pursued. AECL is performing a comprehensive review of the EC6 design in the wake of the Fukushima accident, will review lessons learned, and incorporate any necessary improvements into new build design. (author)

  18. Review of Bruce A reactor regulating system software

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-12-01

    Each of the four reactor units at the Ontario Hydro Bruce A Nuclear Generating Station is controlled by the Reactor Regulating System (RRS) software running on digital computers. This research report presents an assessment of the quality and reliability of the RRS software based on a review of the RRS design documentation, an analysis of certain significant Event Reports (SERs), and an examination of selected software changes. We found that the RRS software requirements (i.e., what the software should do) were never clearly documented, and that design documents, which should describe how the requirements are implemented, are incomplete and inaccurate. Some RRS-related SERs (i.e., reports on unexpected incidents relating to the reactor control) implied that there were faults in the RRS, or that RRS changes should be made to help prevent certain unexpected events. The follow-up investigations were generally poorly documented, and so it could not usually be determined that problems were properly resolved. The Bruce A software change control procedures require improvement. For the software changes examined, there was insufficient evidence provided by Ontario Hydro that the required procedures regarding change approval, independent review, documentation updates, and testing were followed. Ontario Hydro relies on the expertise of their technical staff to modify the RRS software correctly; they have confidence in the software code itself, even if the documentation is not up-to-date. Ontario Hydro did not produce the documentation required for an independent formal assessment of the reliability of the RRS. (author). 37 refs., 3 figs.

  19. Review of Bruce A reactor regulating system software

    International Nuclear Information System (INIS)

    1995-12-01

    Each of the four reactor units at the Ontario Hydro Bruce A Nuclear Generating Station is controlled by the Reactor Regulating System (RRS) software running on digital computers. This research report presents an assessment of the quality and reliability of the RRS software based on a review of the RRS design documentation, an analysis of certain significant Event Reports (SERs), and an examination of selected software changes. We found that the RRS software requirements (i.e., what the software should do) were never clearly documented, and that design documents, which should describe how the requirements are implemented, are incomplete and inaccurate. Some RRS-related SERs (i.e., reports on unexpected incidents relating to the reactor control) implied that there were faults in the RRS, or that RRS changes should be made to help prevent certain unexpected events. The follow-up investigations were generally poorly documented, and so it could not usually be determined that problems were properly resolved. The Bruce A software change control procedures require improvement. For the software changes examined, there was insufficient evidence provided by Ontario Hydro that the required procedures regarding change approval, independent review, documentation updates, and testing were followed. Ontario Hydro relies on the expertise of their technical staff to modify the RRS software correctly; they have confidence in the software code itself, even if the documentation is not up-to-date. Ontario Hydro did not produce the documentation required for an independent formal assessment of the reliability of the RRS. (author). 37 refs., 3 figs

  20. Probabilistic integrity assessment of pressure tubes in an operating pressurized heavy water reactor

    Energy Technology Data Exchange (ETDEWEB)

    Oh, Young-Jin; Park, Heung-Bae [KEPCO E and C, 188 Gumi-dong, Bundang-gu, Seongnam-si, Gyeonggi-do 463-870 (Korea, Republic of); Lee, Jung-Min; Kim, Young-Jin [School of Mechanical Engineering, Sungkyunkwan University, 300 Chunchun-dong, Jangan-gu, Suwon-si, Gyeonggi-do 440-746 (Korea, Republic of); Ko, Han-Ok [Korea Institute of Nuclear Safety, 34 Gwahak-ro, Yuseong-gu, Daejeon-si 305-338 (Korea, Republic of); Chang, Yoon-Suk, E-mail: yschang@khu.ac.kr [Department of Nuclear Engineering, Kyung Hee University, 1 Seocheon-dong, Giheung-gu, Yongin-si, Gyeonggi-do 446-701 (Korea, Republic of)

    2012-02-15

    Even though pressure tubes are major components of a pressurized heavy water reactor (PHWR), only small proportions of pressure tubes are sampled for inspection due to limited inspection time and costs. Since the inspection scope and integrity evaluation have been treated by using a deterministic approach in general, a set of conservative data was used instead of all known information related to in-service degradation mechanisms because of inherent uncertainties in the examination. Recently, in order that pressure tube degradations identified in a sample of inspected pressure tubes are taken into account to address the balance of the uninspected ones in the reactor core, a probabilistic approach has been introduced. In the present paper, probabilistic integrity assessments of PHWR pressure tubes were carried out based on accumulated operating experiences and enhanced technology. Parametric analyses on key variables were conducted, which were periodically measured by in-service inspection program, such as deuterium uptake rate, dimensional change rate of pressure tube and flaw size distribution. Subsequently, a methodology to decide optimum statistical distribution by using a robust method adopting a genetic algorithm was proposed and applied to the most influential variable to verify the reliability of the proposed method. Finally, pros and cons of the alternative distributions comparing with corresponding ones derived from the traditional method as well as technical findings from the statistical assessment were discussed to show applicability to the probabilistic assessment of pressure tubes.

  1. Characterisation of reactor control rod drives. Specification 1-6. Reaktorstellstabantriebe. Typenblaetter 1-6

    Energy Technology Data Exchange (ETDEWEB)

    1975-03-01

    The committee 'Kernreaktorregelung' of VDI/VDE-Gesellschaft Mess- und Regelungstechnik has developed 6 specifications (Typenblaetter) of reactor control rod drives. The specifications are aimed at giving engineers in reactor control systems an outline concerning the function as well as some construction characteristics. (orig./LN).

  2. Ontario Hydro annual report 1985

    International Nuclear Information System (INIS)

    1986-04-01

    Ontario Hydro is a corporation without share capital created by a special statute of the Province of Ontario in 1906. It now operates under the authority of the Power Corporation Act, R.S.O. 1980, Chapter 384, as amended, with broad powers to generate, supply and deliver electric power throughout the province. It is also authorized to produce and sell steam and hot water as primary products. The Corporation's prime objective is to supply the people of Ontario with electricity at the lowest feasible cost consistent with high safety and quality of service standards. Ontario Hydro's main activity is wholesaling electric power to municipal utilities in urban areas who, in turn, retail it to customers in their service areas. In 1985, approximately 3,166,000 customers were served by Ontario Hydro and the municipal utilities in the province. Ontario Hydro operates 81 hydraulic, fossil and nuclear generating stations and an extensive power grid across Ontario to meet the province's demands for electric energy. Interconnections with other systems place the Corporation in an extensive electrical grid that covers a large segment of the North American continent. Ontario Hydro is a financially self-sustaining corporation. The Province of Ontario guarantees bonds and notes issued to the public by the Corporation

  3. Pickering emulsions stabilized by whey protein nanoparticles prepared by thermal cross-linking

    NARCIS (Netherlands)

    Wu, Jiande; Shi, Mengxuan; Li, Wei; Zhao, Luhai; Wang, Ze; Yan, Xinzhong; Norde, Willem; Li, Yuan

    2015-01-01

    A Pickering (o/w) emulsion was formed and stabilized by whey protein isolate nanoparticles (WPI NPs). Those WPI NPs were prepared by thermal cross-linking of denatured WPI proteins within w/o emulsion droplets at 80. °C for 15. min. During heating of w/o emulsions containing 10% (w/v) WPI

  4. Ontario regulatory update

    International Nuclear Information System (INIS)

    Thompson, P.

    1998-01-01

    This paper provides a summary of recent events which when combined add up to a gradual but unmistakable movement of the energy sector in Ontario towards a fully competitive market. Some of the events precipitating this movement towards competition include the passing of the Energy Competition Act of 1998 (Bill 35), electricity deregulation, regulatory reform of the natural gas sector, and changes to the consumer protection legislation. The role of the Ontario Energy Board was also updated to bring it in line with the demands of the competitive marketplace. Among the new roles that the Board will assume are to facilitate competition, to maintain fair and reasonable rates, and to facilitate rational expansion. Another objective is to provide opportunities for including energy efficiency in government policies. Implications of the changes in the OEB's mandate for market participants were also discussed, including (1) regulated gas sales and delivery mechanisms, (2) transactional services, (3) contract restructuring, (4) consumer protection, (5) supervision of competitive market participants, and (6) market surveillance

  5. Validation of the dynamics of SDS and RRS flux, flow, pressure and temperature signals using noise analysis technique

    International Nuclear Information System (INIS)

    Glockler, O.; Cooke, D.F.; Tulett, M.V.

    1995-01-01

    In 1992, a program was initiated to establish reactor noise analysis as a practical tool for plant performance monitoring and system diagnostics in Ontario Hydro's CANDU reactors. Since then, various CANDU-specific noise analysis applications have been developed and validated. The noise-based statistical techniques are being successfully applied as powerful troubleshooting and diagnostic tools to a wide variety of actual operational I and C problems. Critical plant components, instrumentation and processes are monitored on a regular basis, and their dynamic characteristics are verified on-power. Recent applications of noise analysis include (1) validating the dynamics of in-core flux detectors (ICFDS) and ion chambers, (2) estimating the prompt fraction ICFDs in noise measurements at full power and in power rundown tests, (3) identifying the cause of excessive signal fluctuations in certain flux detectors, (4) validating the dynamic coupling between liquid zone control signals, (5) detecting and monitoring mechanical vibrations of detector tubes, reactivity devices and fuel channels induced by moderator/coolant flow, (6) estimating the dynamics and response time of RTD temperature signals, (7) isolating the cause of RTD signal anomalies, (8) investigating the source of abnormal flow signal behaviour, (9) estimating the overall response time of flow and pressure signals, (1 0) detecting coolant boiling in fully instrumented fuel channels, (1 1) monitoring moderator circulation via temperature noise, and (12) predicting the performance of shut-off rods. Some of these applications are performed on an as needed basis. The noise analysis program, in the Pickering-B station alone, has saved Ontario Hydro millions of dollars during its first three years. The results of the noise analysis program have been also reviewed by the regulator (Atomic Energy Control Board of Canada) with favorable results. The AECB have expressed interest in Ontario Hydro further exploiting the

  6. Experimental study of poison moderator interface movement for shut down system #2(SDS#2) of 540 MWe PHWR

    International Nuclear Information System (INIS)

    Sapra, M.K.; Kundu, S.; Chawan, D.B.; Ananthan, P.; Sharma, B.S.V.G.; Mohan, L.R.

    2005-03-01

    The poison solution and the moderator in Secondary Shutdown System (SDS-2) of 500 MWe PHWR, are separated by their own liquid in liquid interface, termed as poison moderator interface (PMI). During normal operation of the reactor, the interface moves towards the calandria, mainly because of molecular diffusion from poison to moderator. Other reasons for movement are mixing of poison and moderator due to physical disturbances in the moderator level and to some extent due to temperature difference between the two liquids. The electrical conductivity of these liquids was found to be the most reliable parameter indicating interface movement. For this purpose, two on-line high-pressure conductivity probes have been installed on moderator side for each one of the six poison tanks. During normal operation of reactor, the interface moves slowly towards the calandria over a period of time and gives rise to increase in conductivity. To study the interface pattern and factors affecting the same, a full-scale experimental setup was developed and series of experiments carried out. The experimental results showed that the interface is quite stable and annunciation can be placed around 100 micro siemens/cm before back flushing is initiated. One dimensional diffusion analysis of the obtained experimental data showed that the derived model for PMI setup with diffusion parameter of 900 cm 2 /hr is able to predict the interface movement quite satisfactorily. This report gives an insight into the experiments carried out for estimation of the effective diffusion parameter for the poison moderator interface, model formulation and its prognostic behavior. (author)

  7. Evaluating the power supply challenge and possible solutions

    International Nuclear Information System (INIS)

    Dalton, J.

    2003-01-01

    This presentation highlighted Ontario's need for additional electric power generating capacity and proposed solutions to encourage traders and marketers to invest in the electricity market and new power projects. The author notes that Ontario's Bill 210 reduced forward market activity. Further government intervention is seen as a risk by investors. New entrants are also concerned with the market dominant position of Ontario Power Generation. Conditions are not currently in place for new generation investment to occur on a strictly market basis. Currently, the market need is driven by the assumption that Pickering 'A' nuclear power generating facility will return to service. Without the Pickering units, Ontario will need additional generating capacity. This presentation also outlined the services offered by Navigant Consulting, a global management firm that offers financial, policy, and economic consulting services to the energy industries. Navigant will provide an Ontario Wholesale Market Briefing Service four times per year. The service will review wholesale market pricing and demand levels since market opening. It will also review recent developments of the Ontario power market, including status of market reform initiatives, market rule changes, and project announcements. The implications of Bill 210 and wholesale market performance since market opening will be assessed with particular attention to market risks and opportunities within the new market structure. 3 tabs., 3 figs

  8. High-Surface-Area, Emulsion-Templated Carbon Foams by Activation of polyHIPEs Derived from Pickering Emulsions

    Directory of Open Access Journals (Sweden)

    Robert T. Woodward

    2016-09-01

    Full Text Available Carbon foams displaying hierarchical porosity and excellent surface areas of >1400 m2/g can be produced by the activation of macroporous poly(divinylbenzene. Poly(divinylbenzene was synthesized from the polymerization of the continuous, but minority, phase of a simple high internal phase Pickering emulsion. By the addition of KOH, chemical activation of the materials is induced during carbonization, producing Pickering-emulsion-templated carbon foams, or carboHIPEs, with tailorable macropore diameters and surface areas almost triple that of those previously reported. The retention of the customizable, macroporous open-cell structure of the poly(divinylbenzene precursor and the production of a large degree of microporosity during activation leads to tailorable carboHIPEs with excellent surface areas.

  9. Waste picker livelihoods and inclusive neoliberal municipal solid waste management policies: The case of the La Chureca garbage dump site in Managua, Nicaragua.

    Science.gov (United States)

    Hartmann, Chris

    2018-01-01

    The modernization (i.e. mechanization, formalization, and capital intensification) and enclosure of municipal solid waste management (MSWM) systems threaten waste picker livelihoods. From 2009 to 2013, a major development project, embodying traditional neoliberal policies with inclusive social policies, transformed the Managua, Nicaragua, municipal solid waste site from an open-air dump where as many as 2,000 informal waste pickers toiled to a sanitary landfill. To investigate waste pickers' social and economic condition, including labor characteristics, household income, and poverty incidence, after the project's completion, 146 semi-structured survey questionnaires were administered to four communities adjacent to the landfill and 45 semi-structured interviews were completed with key stakeholders. Findings indicate that hundreds of waste pickers were displaced by the project, employment benefits from the project were unevenly distributed by neighborhood, and informal waste picking endures due to persistent impoverishment, thereby contributing to continued social and economic marginalization and environmental degradation. The findings highlight the limitations of inclusive neoliberal development efforts to transform MSWM in a low-income country. Copyright © 2017 Elsevier Ltd. All rights reserved.

  10. Is there a future for coal in Ontario?

    International Nuclear Information System (INIS)

    Davies, G.

    2004-01-01

    This PowerPoint presentation examined the efficacy of a governmental decision in 2003 to close all Ontario coal stations by 2007. Coal currently represents one quarter of Ontario's energy and capacity. Projected supply and demand gaps for Ontario were presented for up to 2020. Ontario's supply options were outlined. It was noted that between $30 and $40 billion in investment in the electricity sector will be needed over the next 10 to 15 years. It was observed that closing coal plants may reduce pollution by 6 per cent at a cost of $2 billion. More than half the smog affecting Ontario comes from the United States, while much of the remaining half is caused by transportation emissions. Details of energy strategies related to coal in the United States were discussed. New coal power plant technologies include supercritical combustion; advanced air pollution control; circulating fluidized bed combustion and integrated coal gasification combined cycles. Coal power plant performance criteria were presented. Various research programs in the United States were reviewed, and roadmap performance targets were presented. It was concluded that high prices and uncertainty for natural gas fired options may reinforce views on the need to rethink coal closures. A strategy was recommended in which Ontario pursued economic options for reducing emissions across all sectors. New investments in latest and best technology for emissions reduction in Ontario's coal-fired stations were recommended, as well as a North American agreement on clean air, and increased Canadian participation in U.S. technology development efforts for clean coal and zero emissions plants by 2025. tabs., figs

  11. Ontario Business Survey Program on energy : impacts of power failure on Ontario businesses

    International Nuclear Information System (INIS)

    2003-01-01

    The Ontario Chamber of Commerce conducted a survey for its members between August 19-23, 2003 to determine the impact of the massive power failure that took place on August 14, 2003. This paper presents the results of the survey which are based on a total of 929 respondents across Ontario. The primary businesses that participated in the survey were: manufacturing, service, technology, commercial, retail, automotive, steel, forestry, and resource businesses. 78 per cent of the respondents replied that the power disruption had a negative impact on their business. 48 per cent of the respondents were without power for 11-24 hours. 65 per cent of the businesses did not have a blackout contingency plan in place, but 63 per cent responded that they will likely develop a plan for future power failures. The survey also asked business members how they would rate the federal, provincial and municipal government's response to the emergency. The participants ranked the top 3 actions that governments can take to prevent future outages as follows: (1) review possible changes to the interconnected grid system, (2) ensure sufficient supply within Ontario, and (3) invest in alternative forms of energy such as solar and wind power. Other recommendations were to implement a sliding scale of energy pricing to reflect the true cost of energy. It was suggested that tax incentives should be offered to encourage energy conservation and the use of alternative energy sources. 2.6 per cent of the respondents suggested that excess energy should not be sold to neighbouring jurisdictions. 1 tab., 6 figs

  12. Reactor protection systems of 500 MWe PHWRs

    Energy Technology Data Exchange (ETDEWEB)

    Mallik, G; Kelkar, M G; Apte, Ravindra [C and I Group, Nuclear Power Corporation, Mumbai (India)

    1997-03-01

    The 500 MWe PHWR has two totally independent, diverse, fast acting shutdown system called Shutdown System 1 (SDS 1) and Shutdown System 2 (SDS 2). The trip generation circuitry of SDS 1 and SDS 2 are known as Reactor Protection System 1 (RPS 1) and Reactor Protection System 2 (RPS 2) respectively. Some of the features specific to 500 MWe reactors are Core Over Power Protection System (COPPS) based upon in core Self Powered Neutron Detector (SPND) signals, use of local two out of three coincidence logic and adoption of overlap testing for RPS 2, use of Fine Impulse Testing (FIT) in RPS 2, testing of the final control elements namely electro-magnetic clutch of individual Shutoff Rods (SRs) of SDS 1 and all the fast acting valves of SDS 2, etc. The two shutdown systems have totally separate sets of sensors and associated signal processing circuitry as well as physical arrangements. A separate computerised test and monitoring unit is used for each of the two shutdown systems. Use of Programmable Digital Comparator (PDC) unit exclusively for reactor protection systems, has been adopted. The capability of PDC unit is enhanced and communication links are provided for its integration in over all system. The paper describes the design features of reactor protection systems. (author). 3 refs., 7 figs., 3 tabs.

  13. Reactor simulator development. Workshop material

    International Nuclear Information System (INIS)

    2001-01-01

    The International Atomic Energy Agency (IAEA) has established a programme in nuclear reactor simulation computer programs to assist its Member States in education and training. The objective is to provide, for a variety of advanced reactor types, insight and practice in reactor operational characteristics and their response to perturbations and accident situations. To achieve this, the IAEA arranges for the supply or development of simulation programs and training material, sponsors training courses and workshops, and distributes documentation and computer programs. This publication consists of course material for workshops on development of such reactor simulators. Participants in the workshops are provided with instruction and practice in the development of reactor simulation computer codes using a model development system that assembles integrated codes from a selection of pre-programmed and tested sub-components. This provides insight and understanding into the construction and assumptions of the codes that model the design and operational characteristics of various power reactor systems. The main objective is to demonstrate simple nuclear reactor dynamics with hands-on simulation experience. Using one of the modular development systems, CASSIM tm , a simple point kinetic reactor model is developed, followed by a model that simulates the Xenon/Iodine concentration on changes in reactor power. Lastly, an absorber and adjuster control rod, and a liquid zone model are developed to control reactivity. The built model is used to demonstrate reactor behavior in sub-critical, critical and supercritical states, and to observe the impact of malfunctions of various reactivity control mechanisms on reactor dynamics. Using a PHWR simulator, participants practice typical procedures for a reactor startup and approach to criticality. This workshop material consists of an introduction to systems used for developing reactor simulators, an overview of the dynamic simulation

  14. Enhanced CANDU 6 Reactor

    International Nuclear Information System (INIS)

    Azeez, S.; Alizadeh, A.; Girouard, P.

    2005-01-01

    Full text: The CANDU 6 power reactor is visionary in its approach, remarkable for its on-power refuelling capability and proven over years of safe, economical and reliable power production. Developed by Atomic Energy of Canada Ltd, the CANDU 6 design offers excellent performance utilizing state-of-the-art technology. The first CANDU 6 plants went into service in the early 1980's as leading edge technology and the design has been continuously advanced to maintain superior performance with an outstanding safety record. The first CANDU 6 plants- Gentilly 2 and Point Lepreau in Canada, Embalse in Argentina and Wolsong- Unit 1 in Korea have been in service for more than 21 years and are still producing electricity at peak performance and to the end of 2004, their average lifetime Capacity Factor was 83.2%. The newer CANDU 6 units in Romania (Cernavoda 1), Korea (Wolsong-Units 2, 3 and 4) and Qinshan (Phase III- Units 1 and 2) have also been performing at outstanding levels. The average lifetime Capacity Factor of the 10 CANDU 6 operating units around the world has been 87% to the end of 2004. Building on these successes, AECL is committed to the further development of this highly successful design, now focussing on meeting customer's needs for reduced costs, further improvements to plant operation and performance, enhanced safety and incorporating up-to-date technology as warranted. This has resulted in AECL embarking on improving the CANDU 6 design through an upgraded product termed as the 'Enhanced CANDU 6' (EC6)- which incorporates several attractive but proven features that will make the CANDU 6 reactor even more economical, safer and easier to operate. Some of the key features that will be incorporated in the EC6 include increasing the plant's power output, shortening the overall project schedule, decreasing the capital cost, dealing with obsolescence issues, optimizing maintenance outages and incorporating lessons learnt through feedback obtained from the

  15. Ontario Hydro 1982 annual report

    International Nuclear Information System (INIS)

    1983-05-01

    Due to the economic recession, primary electrical energy demand for the year failed to exceed that of the previous year for the first time since 1944. Actual demand was 100.8 billion kWh, 0.8 per cent below 1981. However, annual peak demand reached 18.1 million kW on January 18, an all-time high, and 5.4 per cent over January 1981. There were 104.1 billion kWh of electricity generated during the year, nearly equally from nuclear, coal, and water power. Nuclear generating units continued their outstanding performance. Bruce-3 completed a 494-day run at continuous power. NPD Generating Station celebrated 20 years of operation. Pickering B unit 5 started up and produced its first power. At Bruce A, a remote-controlled vehicle was used to remove damaged fuel to a shielded flask, completing the job in a short time with low staff radiation exposure. Bruce B construction progressed on schedule; while at Darlington, design and construction continued at a high level, with 1700 workers on site at year-end. Actual net income was $348 million, $38 million below forecast. Coal deliveries were 13.4 million Mg (23 per cent over 1981). Nuclear fuel deliveries to generating stations were 996 Mg (3 per cent over 1981). Agreements were negotiated for the supply of 5200 Mg of uranium concentrates during 1985-93. Nuclear fuel manufacturing contracts were awarded at lower prices than previously attained. Income totalling $163 million from electricity exports to the U.S.A. reduced overall cost of providing electricity to Ontario customers by 5.1 per cent. The Residential Energy Advisory Program surveyed 16,000 homeowners wishing to improve home energy efficiency. There were 20,000 residential customers who received grants to convert from oil to electric heating. Additional consumption resulting from these conversions is estimated at 280 million kWh

  16. Ontario electricity rates and industrial competitiveness

    International Nuclear Information System (INIS)

    2006-01-01

    Industrial electricity prices in Ontario rose significantly after the opening of the competitive Ontario electricity market in 2002, thereby widening the gap between industrial electricity prices in Ontario and those in other Canadian provinces. Navigant Consulting Ltd. conducted this study at the request of the Association of Major Power Consumers in Ontario (AMPCO) to research and compare current and historical electricity prices in Ontario and other jurisdictions in North America. The study provided an independent analysis of how industrial electricity prices in Ontario compare to those in other jurisdiction in which AMPCO members operate. It also formed the basis for comparing the impacts of electricity policy on the economic competitiveness of major power consumers in Ontario. The relative electricity intensity in the United States, Ontario and other Canadian provinces was reviewed for specific industries, including forest products, steel manufacturing, petroleum refining, chemical manufacturing and cement manufacturing. Publicly available aggregate data from Statistics Canada and the United States Bureau of the Census was then used to compare average electricity prices for industrial customers in Ontario. The data confirmed that Ontario has experienced a decline in its competitive price advantage in industrial electricity. Delivered industrial electricity prices in Ontario have increased by more than 60 per cent since 2001. Industrial electricity prices in Ontario rose above those in Quebec, Manitoba, British Columbia and New Brunswick. In addition, industrial electricity prices in Ontario rose above those in competing states such as Ohio and Illinois, in part due to the increase in the value of the Canadian dollar. It was concluded that the price increase may lead to a greater decline in economic output in Ontario compared to competing jurisdictions. 2 tabs., 14 figs., 1 appendix

  17. Ontario's Clean Air Action Plan : protecting environmental and human health in Ontario

    International Nuclear Information System (INIS)

    2004-01-01

    Ontario's Clean Air Action Plan was launched in June 2000 in an effort to improve air quality and comply with the Canada-Wide Standards for Particulate Matter and Ozone. This paper describes Ontario's approach to reducing smog. Smog-related air pollution is linked to health problems such as premature death, respiratory and heart problems. Smog also contributes to environmental problems such as damage to forests, agricultural crops and natural vegetation. The two main ingredients of smog are ground level ozone and particulate matter. In order to reduce the incidence of smog, the following four key smog-causing pollutants must be reduced: nitrogen oxides, volatile organic compounds, sulphur dioxide and particular matter. This paper includes the 2001 estimates for Ontario's emissions inventory along with Ontario's smog reduction targets. It was noted that approximately half of all smog in Ontario comes from sources in the midwestern United States. The province of Ontario is committed to replacing coal-fired power plants with cleaner sources of energy. It is also considering emission caps for key industrial sectors. The key players in reducing smog include municipalities, industry, individuals, the federal government and programs that reduce emissions in the United States. 3 figs., 8 tabs., 1 appendix

  18. Proceedings of the Canadian Institute's 3. annual conference on generation adequacy in Ontario : strategies to increase capacity to ensure a reliable electricity supply in Ontario

    International Nuclear Information System (INIS)

    2006-01-01

    This conference provided a forum for the discussion of issues related to generation adequacy in Ontario. Members of the electricity industry as well as members from governmental and non-governmental agencies discussed a variety of recommendations for cost-effective reliable energy in Ontario. Issues related to the overhaul or replacement of nuclear power reactors and coal-fired generators in the province were reviewed. The status of various wind power projects in the province was examined along with issues related to interconnected power systems. Best practices for the planning and execution of electricity infrastructure projects were also reviewed, and issues related to stakeholder involvement in electricity generation projects were discussed. The discussions also described recent developments in electricity generation in various jurisdictions in Canada and the United States. The conference featured 19 presentations, of which 7 have been catalogued separately for inclusion in this database. tabs., figs

  19. Ontario Hydro's DSP update

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    Ontario Hydro's Demand/Supply Plan (DSP), the 25 year plan which was submitted in December 1989, is currently being reviewed by the Environmental Assessment Board (EAB). Since 1989 there have been several changes which have led Ontario Hydro to update the original Demand/Supply Plan. This information sheet gives a quick overview of what has changed and how Ontario Hydro is adapting to that change

  20. Thermal and fast reactor benchmark testing of ENDF/B-6.4

    International Nuclear Information System (INIS)

    Liu Guisheng

    1999-01-01

    The benchmark testing for B-6.4 was done with the same benchmark experiments and calculating method as for B-6.2. The effective multiplication factors k eff , central reaction rate ratios of fast assemblies and lattice cell reaction rate ratios of thermal lattice cell assemblies were calculated and compared with testing results of B-6.2 and CENDL-2. It is obvious that 238 U data files are most important for the calculations of large fast reactors and lattice thermal reactors. However, 238 U data in the new version of ENDF/B-6 have not been renewed. Only data of 235 U, 27 Al, 14 N and 2 D have been renewed in ENDF/B-6.4. Therefor, it will be shown that the thermal reactor benchmark testing results are remarkably improved and the fast reactor benchmark testing results are not improved

  1. Ultrasonic evaluation of end cap weld joints of fuel elements of pressurized heavy water reactors using signal analysis methods

    International Nuclear Information System (INIS)

    Raj, B.; Thavasimuthu, M.; Subramanian, C.V.; Kalyanasundaram, P.; Rajagopalan, C.

    1992-01-01

    This paper describes the application of ultrasonic digital signal analysis for the detection of fine defects of the order of 10% or lower of wall thickness (WT) of 370 microns in the resistance welded end cap-cladding tube joints of fuel elements used in Pressurised Heavy Water Reactors (PHWR s). The results obtained for the detection of such defects, have confirmed the sensitivity and reliability of this approach, and were further validated by destructive metallography. (author)

  2. Ontario electricity industry restructuring

    International Nuclear Information System (INIS)

    1999-01-01

    The objective of Ontario's electricity industry restructuring was described as an effort to enhance Ontario's competitiveness. It is believed that restructuring can be accomplished without an increase in electricity rates. In a series of charts, the report provides the timeline of restructuring from the time of the Macdonald report in 1995 to the beginning of open competition in Ontario electricity markets. It oulines the principles underlying the financial restructuring and the financial results of restructuring, including the size of the stranded debt ($ 7.8 billion). It lists the changes that have occurred since October 1998, explains some key factors in valuing the successor companies and profiles the Ontario Electricity Financial Corporation. Restructuring of the industry is expected to have a neutral to positive impact on Ontario's fiscal position. The residual stranded debt of $7.8 billion will be retired through revenues generated by the electricity sector, without recourse to the Provincial Treasury. 9 figs

  3. Radiometric determination of 90Sr in the dissolver solution of the spent PHWR fuel after its separation with solvent extraction and extraction chromatography

    International Nuclear Information System (INIS)

    Kulkarni, P.G.; Gupta, K.K.; Pant, D.K.; Bhalerao, B.A.; Gurba, P.B.; Janardan, P.; Changrani, R.D.; Dey, P.K.; Pathak, P.N.; Mohapatra, P.K.; Manchanda, V.K.

    2010-01-01

    A simple radiometric method for 90 Sr determination in the dissolver solution of the PHWR spent fuel has been developed.The method involves the quantitative separation of Sr from the associated actinides and other fission products by solvent extraction with 30% trialkylphosphine oxide (TRPO) -n-dodecane followed by extraction chromatography with XAD-7-Di-butylcyclohexano-18-crown-6 resin. The separation scheme yields quantitative recovery of 90 Sr and the separated 90 Sr was found to be radiochemically pure. 90 Sr was estimated by β-radiometry and the precision of the method at 5 mCi/mL level was 2% (RSD). (author)

  4. Update of the Picker C9 irradiator control system of the gamma II room of the secondary laboratory of dosimetric calibration

    International Nuclear Information System (INIS)

    Simon S, L. E.

    2016-01-01

    The Picker C9 irradiator is responsible for the calibration of different radiological equipment and the control system that maintains it in operation is designed in the graphical programming software LabVIEW (Laboratory Virtual Instrumentation Engineering Workbench), being its major advantages: the different types of communication, easy interconnection with other software and the recognition of different hardware devices, among others. Operation of the irradiator control system is performed with the NI-Usb-6008 (DAQ) data acquisition module of the National Instruments Company. The purpose of this work is to update the routines that make the Picker C9 control system of the gamma II room of the secondary laboratory of dosimetric calibration, using the graphic programming software LabVIEW, as well as to configure the new acquisition hardware of data that is implemented to control the Picker C9 irradiator system and ensure its operation. (Author)

  5. CANDU reactor experience: fuel performance

    International Nuclear Information System (INIS)

    Truant, P.T.; Hastings, I.J.

    1985-07-01

    Ontario Hydro has more than 126 reactor-years experience in operating CANDU reactors. Fuel performance has been excellent with 47 000 channel fuelling operations successfully completed and 99.9 percent of the more than 380 000 bundles irradiated operating as designed. Fuel performance limits and fuel defects have had a negligible effect on station safety, reliability, the environment and cost. The actual incapability charged to fuel is less than 0.1 percent over the stations' lifetimes, and more recently has been zero

  6. Hydrogeological impacts of road salt from Canada's busiest highway on a Lake Ontario watershed (Frenchman's Bay) and lagoon, City of Pickering.

    Science.gov (United States)

    Meriano, Mandana; Eyles, Nick; Howard, Ken W F

    2009-06-26

    The quantity of deicing salt applied to paved surfaces in urban watersheds in cold regions has had a significant and cumulative effect on groundwater quality. Whereas road deicing salt is known in general to impact groundwater and surface water quality, quantitative information on the impact of large transport routes is lacking. In this study, we provide a chloride mass balance for an urban stream crossed by a large transport route in south-central Ontario, Canada and quantify likely long-term impacts of salt loading on surface and groundwater resources. The chloride mass balance, supported by hydrochemical analysis, reveals that approximately 50% of the total road salt applied to Pine Creek (1700 tonnes per winter) is removed annually via overland flow with the remainder accumulating in the shallow subsurface resulting in severe degradation of groundwater quality. Moreover, results show that road salt migration is the primary reason for enhanced mineral weathering in the shallow aquifer. During the 2004-05 salting season, runoff and baseflow transport of road salts were responsible for chloride concentrations in the stream of up to 2000 mg L(-1), and delivered approximately 850 tonnes of chloride (about 1400 tonnes of salt) to a shallow (<3.5 m) semi-enclosed lagoon on the shore of Lake Ontario (Frenchman's Bay; 0.85 km(2)). The total chloride delivery to the lagoon from its entire watershed is estimated at 3700 tonnes each year with up to 48% of the total load delivered by baseflow, the remainder from surface water runoff. Present day groundwater chloride concentrations are estimated to be about 80% of long-term concentrations when the system reaches steady state.

  7. Hydrogeological impacts of road salt from Canada's busiest highway on a Lake Ontario watershed (Frenchman's Bay) and lagoon, City of Pickering

    Science.gov (United States)

    Meriano, Mandana; Eyles, Nick; Howard, Ken W. F.

    2009-06-01

    The quantity of deicing salt applied to paved surfaces in urban watersheds in cold regions has had a significant and cumulative effect on groundwater quality. Whereas road deicing salt is known in general to impact groundwater and surface water quality, quantitative information on the impact of large transport routes is lacking. In this study, we provide a chloride mass balance for an urban stream crossed by a large transport route in south-central Ontario, Canada and quantify likely long-term impacts of salt loading on surface and groundwater resources. The chloride mass balance, supported by hydrochemical analysis, reveals that approximately 50% of the total road salt applied to Pine Creek (1700 tonnes per winter) is removed annually via overland flow with the remainder accumulating in the shallow subsurface resulting in severe degradation of groundwater quality. Moreover, results show that road salt migration is the primary reason for enhanced mineral weathering in the shallow aquifer. During the 2004-05 salting season, runoff and baseflow transport of road salts were responsible for chloride concentrations in the stream of up to 2000 mg L - 1 , and delivered approximately 850 tonnes of chloride (about 1400 tonnes of salt) to a shallow (< 3.5 m) semi-enclosed lagoon on the shore of Lake Ontario (Frenchman's Bay; 0.85 km 2). The total chloride delivery to the lagoon from its entire watershed is estimated at 3700 tonnes each year with up to 48% of the total load delivered by baseflow, the remainder from surface water runoff. Present day groundwater chloride concentrations are estimated to be about 80% of long-term concentrations when the system reaches steady state.

  8. Meeting Ontario's electricity needs : a critical review of the Ontario Power Authority's supply mix advice report

    International Nuclear Information System (INIS)

    Gibbons, J.; Fracassi, J.

    2006-01-01

    In December, 2005 the Ontario Power Authority (OPA) outlined its proposed blueprint for meeting Ontario's electricity needs to 2025 in the document entitled Supply Mix Advice Report. As a result of the actions taken by the current government, the OPA believes that Ontario will have adequate electricity supplies to meet the province's needs until 2013. However, it stated that Ontario will require an additional 15,000 megawatts of new generation capacity between 2013 and 2025. The OPA also recommends that a significant proportion of this new generation capacity be nuclear. The Ontario Clean Air Alliance undertook a review of the OPA report and identified several discrepancies including an over-estimation of Ontario's rate of electricity load growth from 2005 to 2025; an under-estimation of the potential for electricity productivity improvements to reduce electricity demand and raise living standards; an under-estimation of renewable energy supply potential; an under-estimation of the potential for biomass and natural gas fired combined heat and power plants to meet electricity needs and increase the competitiveness of Ontario's industries; an under-estimation of the economic costs and risks of nuclear power; and a biased recommendation for a 70 million dollar resource acquisition budget against energy efficiency investments that would reduce demand and raise living standards. This report provides the Ontario Clean Air Alliances' analysis of the OPA report and presents it own recommendations for how Ontario can increase its electricity productivity and meet its electricity supply needs until 2025. The report concluded that the Government of Ontario should direct the OPA to develop a long-term strategy to raise the price of electricity up to its full cost without raising the electricity bills of low income consumers or impairing the competitiveness of Ontario's industries. It was suggested that Ontario's electricity productivity should be increased to the same level as

  9. Characterisation of reactor control rod drives. Specification 1-6

    International Nuclear Information System (INIS)

    1975-03-01

    The committee 'Kernreaktorregelung' of VDI/VDE-Gesellschaft Mess- und Regelungstechnik has developed 6 specifications (Typenblaetter) of reactor control rod drives. The specifications are aimed at giving engineers in reactor control systems an outline concerning the function as well as some construction characteristics. (orig./LN) [de

  10. Emissions trading in the context of electricity deregulation : a case study on Ontario

    International Nuclear Information System (INIS)

    Johns, G.

    2003-01-01

    This presentation discussed the deregulation of the electric power industry in Ontario and Alberta with particular reference to emissions trading, emissions profiles for the two provinces, and current market rules. It was noted that deregulation in Ontario is the major impetus for developing an emission trading system. Alberta is also in the process of developing an emission trading system for all industry sectors. The author discussed Ontario's Bill 210 which places a 6 year cap on prices and which offers tax incentives for renewable energy sources. It was argued that Bill 210 negates new generation and inhibits participants and competition in emissions trading market. Ontario generators face competitiveness concerns with neighbouring jurisdictions. Current market rules were outlined for emission caps, allocation for nitrogen oxide and sulfur dioxide allowances, credit creation, emission trading, and credit use. 6 figs

  11. Radioactive effluents from CANDU 6 reactors during normal operation

    International Nuclear Information System (INIS)

    Boss, C.R.; Allsop, P.J.

    1995-12-01

    During routine operation of a CANDU 6 reactor, various gaseous, liquid, and solid radioactive wastes are generated. The layout of the CANDU 6 reactor and the design of its systems ensure that these are minimized, but small quantities of gaseous and liquid wastes are continually discharged at very low concentrations. This report discusses the make-up of these chronically generated gaseous and liquid effluents. From a safety perspective, the doses to individual members of the public resulting from radioactive wastes chronically discharged from CANDU 6 reactors have been negligible. Similarly, doses to the regional and global populations have been negligible, generally less than 0.001% of background. While far below regulatory limits, releases of tritium, noble gases and gross β - -γ have been the most radiologically significant emissions, while radioiodine and particulates have had the greatest potential to deliver public dose. (author). 8 refs., 16 tabs., 3 figs

  12. Effects of Occupational Exposure on the Health of Rag Pickers Due to Fungal Contamination at Waste Dumping Sites in Gwalipor (India

    Directory of Open Access Journals (Sweden)

    Harandra K. Sharma

    2017-02-01

    Full Text Available We investigated fungal contamination near different waste dumping sites and assessed the health risk factors of rag pickers associated with collection of waste in Gwalior during the year 2014-15. Petri plates were exposed at waste dumping sites and were transferred to the laboratory, analysis and identification was mainly carried out by culturing the fungal colonies by following standard procedures. A pretested questionnaire was used to evaluate the health problems among the rag pickers. Results indicated that all the dumping sites are contaminated with different types of fungal pathogens like Alternaria alternate, Aspergillus flavus, A. fumigates, A. niger, Cladosporium, Fusarium, Mucor, Penicillium and Rhizopus. Our study reported higher incidence of musculoskeletal and respiratory diseases among rag pickers. There is also strong need for carrying out similar assessment studies for other cities too. This will entail generation of more precise site specific information regarding fungal species and associated health risk factor.

  13. Effects of Occupational Exposure on the Health of Rag Pickers Due to Fungal Contamination at Waste Dumping Sites in Gwalior (India

    Directory of Open Access Journals (Sweden)

    Harandra K. Sharma

    2017-02-01

    Full Text Available We investigated fungal contamination near different waste dumping sites and assessed the health risk factors of rag pickers associated with collection of waste in Gwalior during the year 2014-15. Petri plates were exposed at waste dumping sites and were transferred to the laboratory, analysis and identification was mainly carried out by culturing the fungal colonies by following standard procedures. A pretested questionnaire was used to evaluate the health problems among the rag pickers. Results indicated that all the dumping sites are contaminated with different types of fungal pathogens like Alternaria alternate, Aspergillus flavus, A. fumigates, A. niger, Cladosporium, Fusarium, Mucor, Penicillium and Rhizopus. Our study reported higher incidence of musculoskeletal and respiratory diseases among rag pickers. There is also strong need for carrying out similar assessment studies for other cities too. This will entail generation of more precise site specific information regarding fungal species and associated health risk factor.

  14. Design considerations and operating experience with wet storage of Ontario Hydro's irradiated fuel

    International Nuclear Information System (INIS)

    Frost, C.R.; Naqvi, S.J.; McEachran, R.A.

    1987-01-01

    The characteristics of Ontario Hydro's fuel and at-reactor irradiated fuel storage water pools (or irradiated fuel bays) are described. There are two types of bay known respectively as primary bays and auxiliary bays, used for at-reactor irradiated fuel storage. Irradiated fuel is discharged remotely from Ontario Hydro's reactors to the primary bays for initial storage and cooling. The auxiliary bays are used to receive and store fuel after its initial cooling in the primary bay, and provide additional storage capacity as needed. The major considerations in irradiated fuel bay design, including site-specific requirements, reliability and quality assurance, are discussed. The monitoring of critical fuel bay components, such as bay liners, the development of high storage density fuel containers, and the use of several irradiated fuel bays at each reactor site have all contributed to the safe handling of the large quantities of irradiated fuel over a period of about 25 years. Routine operation of the irradiated fuel bays and some unusual bay operational events are described. For safety considerations, the irradiated fuel in storage must retain its integrity. Also, as fuel storage is an interim process, likely for 50 years or more, the irradiated fuel should be retrievable for downstream fuel management phases such as reprocessing or disposal. A long-term experimental program is being used to monitor the integrity of irradiated fuel in long-term wet storage. The well characterized fuel, some of which has been in wet storage since 1962 is periodically examined for possible deterioration. The evidence from this program indicates that there will be no significant change in irradiated fuel integrity (and retrievability) over a 50 year wet storage period

  15. CANDU fuel - fifteen years of power reactor experience

    International Nuclear Information System (INIS)

    Fanjoy, G.R.; Bain, A.S.

    1977-01-01

    CANDU (Canada Deuterium Uranium) fuel has operated in power reactors since 1962. Analyses of performance statistics, supplemented by examinations of fuel from power reactors and experimental loops have yielded: (a) A thorough understanding of the fundamental behaviour of CANDU fuel. (b) Data showing that the predicted high utilization of uranium has been achieved. Actual fuelling costs in 1976 at the Pickering Generating Station are 1.2 m$/kWh (1976 Canadian dollars) with the simple oncethrough natural-UO 2 fuel cycle. (c) Criteria for operation, which have led to the current very low defect rate of 0.03% of all assemblies and to ''CANLUB'' fuel, which has a graphite interlayer between the fuel and sheath to reduce defects on power increases. (d) Proof that the short length (500 mm), collapsible cladding features of the CANDU bundle are successful and that the fuel can operate at high-power output (current peak outer-element linear power is 58 +- 15% kW/m). Involvement by the utility in all stages of fuel development has resulted in efficient application of this fundamental knowledge to ensure proper fuel specifications, procurement, scheduling into the reactor and feedback to developers, designers and manufacturers. As of mid-1976 over 3 x 10 6 individual elements have been built in a well-estabilished commercially competitive fuel fabrication industry and over 2 x 10 6 elements have been irradiated. Only six defects have been attributed to faulty materials or fabrication, and the use of high-density UO 2 with low-moisture content precluded defects from hydrogen contamination and densification. Development work on UO 2 and other fuel cycles (plutonium and thorium) is continuing, and, because CANDU reactors use on-power fuelling, bundles can be inserted into power reactors for testing. Thus new fuel designs can be quickly adopted to ensure that the CANDU system continues to provide low-cost energy with high reliability

  16. Ontario Hydro statistical yearbook 1990

    International Nuclear Information System (INIS)

    1990-01-01

    Ontario Hydro was created in 1906 by a special statute of the Province of Ontario. It is a financially self-sustaining corporation without share capital. The yearbook is a compilation of financial data detailed by financial statements and sales and revenue figures for the year 1990. It is broken down by municipalities served in Ontario

  17. Ontario Hydro statistical yearbook 1990

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1991-12-31

    Ontario Hydro was created in 1906 by a special statute of the Province of Ontario. It is a financially self-sustaining corporation without share capital. The yearbook is a compilation of financial data detailed by financial statements and sales and revenue figures for the year 1990. It is broken down by municipalities served in Ontario.

  18. Assessment of field training for nuclear operations personnel

    International Nuclear Information System (INIS)

    White, M.

    1995-08-01

    Training of station personnel is an important component of the safe operation of the nuclear generating station. On-the-job training (OJT) is an important component of training. The AECB initiated this project to develop a process to assess the effectiveness of OJT for field operators, and perform an initial trial of the developed process. This report describes the recommended process to assess the effectiveness of OJT for field operators, as well as the results of the initial assessment at Pickering Nuclear Generating Station. The assessment's conclusions included: (1) Ontario Hydro policies and procedures are generally consistent with industry guidelines requiring a systematic approach to training; (2) Pickering NGS field operator performance is not always consistent with documented station requirements and standards, nor industry guidelines and practices; and (3) The Pickering NGS field operator on-the-job training is not consistent with a systematic approach to training, a requirement recognized in Ontario Hydro's Policy NGD 113, and does not contribute to a high level of performance in field operator tasks. Recommendations are made regarding the use of the developed process for future assessments of on-the-job training at nuclear power plants. (author). 36 refs., 4 tabs., 3 figs

  19. Hydroxyapatite-armored poly(ε-caprolactone) microspheres and hydroxyapatite microcapsules fabricated via a Pickering emulsion route.

    Science.gov (United States)

    Fujii, Syuji; Okada, Masahiro; Nishimura, Taiki; Maeda, Hayata; Sugimoto, Tatsuya; Hamasaki, Hiroyuki; Furuzono, Tsutomu; Nakamura, Yoshinobu

    2012-05-15

    Hydroxyapatite (HAp) nanoparticle-armored poly(ε-caprolactone) (PCL) microspheres were fabricated via a "Pickering-type" emulsion solvent evaporation method in the absence of any molecular surfactants. It was clarified that the interaction between carbonyl/carboxylic acid groups of PCL and the HAp nanoparticles at an oil-water interface played a crucial role in the preparation of the stable Pickering-type emulsions and the HAp nanoparticle-armored microspheres. The HAp nanoparticle-armored PCL microspheres were characterized in terms of size, size distribution, morphology, and chemical compositions using scanning electron microscopy, laser diffraction, energy dispersive X-ray microanalysis, and thermogravimetric analysis. The presence of HAp nanoparticles at the surface of the microspheres was confirmed by scanning electron microscopy and energy dispersive X-ray microanalysis. Pyrolysis of the PCL cores led to the formation of the corresponding HAp hollow microcapsules. Copyright © 2012 Elsevier Inc. All rights reserved.

  20. [Ontario Hydro]. Corporate performance report, 1994

    International Nuclear Information System (INIS)

    1995-01-01

    Summarizes Ontario Hydro's corporate performance for the year, with actual results being compared against planned values. Also includes additional indicators that illustrate noteworthy trends in corporate performance. Corporate results are reported under the new organizational structure implemented in 1993, beginning with overall results in such areas as customer service, environmental stewardship, human resources, and finance. This is followed by reports from the Generation Business Group, Customer Services Group, Corporate Business Group, General Counsel and Secretary, Ontario Hydro Audit, Strategic Planning, Environment and Communication Group, and Ontario Hydro enterprises (Ontario Hydro Technologies, Ontario Hydro International). The appendix includes summary financial statements

  1. Pickering emulsion: A novel template for microencapsulated phase change materials with polymer–silica hybrid shell

    International Nuclear Information System (INIS)

    Yin, Dezhong; Ma, Li; Liu, Jinjie; Zhang, Qiuyu

    2014-01-01

    MePCMs (microencapsulated phase change materials) with covalently bonded SiO 2 /polymer hybrid as shell were fabricated via Pickering emulsion polymerization stabilized solely by organically-modified SiO 2 particles. Morphology and core–shell structure of these microcapsules were observed by scanning electron microscopy (SEM). Thermal properties of microencapsulated 1-dodecanol were determined using DSC (differential scanning calorimetry) and TGA (thermal gravimetric analysis). The results indicate that mass ratio of St (styrene)/DVB (divinylbenzene)/dodecanol has great effect on the morphology, inner structure, microencapsulation efficiency and durability of resultant MePCMs. When ratio of St/DVB/dodecanol was 5/1/12, dodecanol content of as much as 62.8% is obtained and the utility efficiency of dodecanol reaches 94.2%. The prepared MePCMs present good durability and thermal reliability. 2.2% of core material leached away the microcapsule after suspended in water for 10 days and 5.8% of core material leached after 2000 accelerated thermal cycling. Our study demonstrated that Pickering emulsion polymerization is a simple and robust method for the preparation of MePCMs with polymer–inorganic hybrids as shell. - Highlights: • We fabricated MePCM via surfactant-free Pickering emulsion polymerization. • The shell of MePCM was composed of PS/SiO 2 organic–inorganic hybrids. • The phase change enthalpy of MePCM is 125.0 J g −1 and the utility efficiency of 1-dodecanol reached 94.2%. • Only 2.2% and 5.8% of core material lost after durability test and 2000 accelerated thermal cycling respectively

  2. A review of fast reactor programme in India - April 1992

    Energy Technology Data Exchange (ETDEWEB)

    Paranjpe, S R [Indira Gandhi Centre for Atomic Research, Kalpakkam, Tamil Nadu (India)

    1992-07-01

    There is no change in the basic policy for development of nuclear energy in India. Fast Breeder Reactors are required to be available commercially to supply increasing quantities of nuclear energy when the first phase programme of deployment of Pressurised Heavy Water Reactors would be reaching the limit imposed by indigenously available natural uranium. Based on presently proven reserves of economically exploitable uranium one cannot expect to support more than 10 to 15 million kilowatt of installed capacity of PHWRs. The immediate goal of the Fast Reactor Programme therefore, remains completion by 2002-2003 of the first 500 MWe Prototype Fast Breeder Reactor which will become the first reactor in the series of reactors to be built there afterwards. This will enable addition of one 500 MWe reactor each year even if the first phase of programme of PHWR is limited to 6.0 million kilowatt. The capital cost of installed kilowatt for FBRs is expected to be comparable to the capital cost per kilowatt for PHWRS. It is expected to launch the construction of PFBR in the next 2 or 3 years as soon as the over all economic condition shows some improvement. In the meantime, manufacturing development of important NSS components like Steam Generators, Sodium Pumps, Main Vessel and Inner Vessel has been initiated. Detailed designs of Control Rod Drive Mechanism (Primary) has been completed and contacts with the manufacturers are being established to identify the industry which would be entrusted with the responsibility of manufacturing the Control Rod Drive Mechanisms. Manufacturing technology for making cladding tubes of D9 stainless steel has been developed and significant progress has been made towards the production of hexagonal wrapper (i.e. Hex-Cans). Inclined Fuel Transfer Machine for loading and unloading the fuel from the Main Vessel has been designed and manufacturing of the prototype machine has been initiated. It is hoped that these steps will enable timely completion

  3. Development of an inconel self powered neutron detector for in-core reactor monitoring

    Energy Technology Data Exchange (ETDEWEB)

    Alex, M. [Electronics Division, BARC, Mumbai (India)]. E-mail: maryalex@barc.gov.in; Ghodgaonkar, M.D. [Electronics Division, BARC, Mumbai (India)

    2007-04-21

    The paper describes the development and testing of an Inconel600 (2 mm diameterx21 cm long) self-powered neutron detector for in-core neutron monitoring. The detector has 3.5 mm overall diameter and 22 cm length and is integrally coupled to a 12 m long mineral insulated cable. The performance of the detector was compared with cobalt and platinum detectors of similar dimensions. Gamma sensitivity measurements performed at the {sup 60}Co irradiation facility in 14 MR/h gamma field showed values of -4.4x10{sup -18} A/R/h/cm (-9.3x10{sup -24} A/{gamma}/cm{sup 2}-s/cm), -5.2x10{sup -18} A/R/h/cm (-1.133x10{sup -23} A/{gamma}/cm{sup 2}-s/cm) and 34x10{sup -18} A/R/h/cm (7.14x10{sup -23} A/{gamma}/cm{sup 2}-s/cm) for the Inconel, Co and Pt detectors, respectively. The detectors together with a miniature gamma ion chamber and fission chamber were tested in the in-core Apsara Swimming Pool type reactor. The ion chambers were used to estimate the neutron and gamma fields. With an effective neutron cross-section of 4b, the Inconel detector has a total sensitivity of 6x10{sup -23} A/nv/cm while the corresponding sensitivities for the platinum and cobalt detectors were 1.69x10{sup -22} and 2.64x10{sup -22} A/nv/cm. The linearity of the detector responses at power levels ranging from 100 to 200 kW was within {+-}5%. The response of the detectors to reactor scram showed that the prompt response of the Inconel detector was 0.95 while it was 0.7 and 0.95 for the platinum and cobalt self-powered detectors, respectively. The detector was also installed in the horizontal flux unit of 540 MW Pressurised Heavy Water Reactor (PHWR). The neutron flux at the detector location was calculated by Triveni code. The detector response was measured from 0.02% to 0.07% of full power and showed good correlation between power level and detector signals. Long-term tests and the dynamic response of the detector to shut down in PHWR are in progress.

  4. Ontario Hydro experience in the identification and mitigation of potential failures in safety critical software systems

    International Nuclear Information System (INIS)

    Huget, R.G.; Viola, M.; Froebel, P.A.

    1995-01-01

    Ontario Hydro has had experience in designing and qualifying safety critical software used in the reactor shutdown systems of its nuclear generating stations. During software design, an analysis of system level hazards and potential hardware failure effects provide input to determining what safeguards will be needed. One form of safeguard, called software self checks, continually monitor the health of the computer on line. The design of self checks usually is a trade off between the amount of computing resources required, the software complexity, and the level of safeguarding provided. As part of the software verification activity, a software hazards analysis is performed, which identifiers any failure modes that could lead to the software causing an unsafe state, and which recommends changes to mitigate that potential. These recommendations may involve a re-structuring of the software to be more resistant to failure, or the introduction of other safeguarding measures. This paper discusses how Ontario Hydro has implemented these aspects of software design and verification into safety critical software used in reactor shutdown systems

  5. VVANTAGE 6 - an advanced fuel assembly design for VVER reactors

    International Nuclear Information System (INIS)

    Doshi, P.K.; DeMario, E.E.; Knott, R.P.

    1993-01-01

    Over the last 25 years, Westinghouse fuel assemblies for pressurized water reactors (PWR's) have undergone significant changes to the current VANTAGE 5. VANTAGE 5 PWR fuel includes features such as removable top nozzles, debris filter bottom nozzles, low-pressure-drop zircaloy grids, zircaloy intermediate flow mixing grids, optimized fuel rods, in-fuel burnable absorbers, and increased burnup capability to region average values of 48000 MWD/MTU. These features have now been adopted to the VVER reactors. Westinghouse has completed conceptual designs for an advanced fuel assembly and other core components for VVER-1000 reactors known as VANTAGE 6. This report describes the VVANTAGE 6 fuel assembly design

  6. Uplifting : mobile cranes and picker trucks get higher, stronger, and safer

    Energy Technology Data Exchange (ETDEWEB)

    Budd, G.

    2008-10-15

    New crane and picker truck equipment designed for use in the oil and gas industry was discussed in this article. The longest crane in the North America is due to arrive in Calgary soon. Mobile cranes are often used for maintenance, construction, and shutdowns at natural gas plants, refineries, and oil batteries. Telescopic cranes are also used to service pump jacks and lift rolls of coiled tubing into place on drilling rigs. While cranes carry more weight, picker trucks are more mobile and flexible. Lattice boom crawler cranes were designed to pick up loads and carry them to different positions. Telescopic cranes must remain stationary, and careful planning is needed to ensure that they are used efficiently. Modern telescopic cranes have hydraulically powered booms. Advanced steel alloy technology is used to produce lightweight booms equipped with automated pin-locking mechanisms. The largest telescopic crane in North America will be used by an oil and gas operator in Alberta. The crane will have a combined boom and lattice jib height of 226 meters, and its maximum lifting capacity is 1200 tonnes. Gantry cranes are also increasingly being used by oil and gas operators due to their ability to straddle loads, thereby reducing the risk of tipping. It was concluded that gantry cranes are particularly suitable for rougher terrains. 4 figs.

  7. Annual report 1991

    International Nuclear Information System (INIS)

    1992-01-01

    During 1991 Ontario Hydro's activities reflected a company in transition marked by changing customer needs, new social demands and global economic pressures. The nuclear system performed below expectations, although performance improved over 1990. Technical problems prevented the utility from bringing Darlington NGS unit 1 into service. Ontario Hydro has committed about $4 billion to extend the lives of fossil and hydroelectric stations and restore nuclear performance. In September Ontario Hydro's management structure was reorganized again. Policy, planning and strategic efforts were put under the direction of the Chair. All operating functions were to report directly to the President. New Board committees were formed to guide environmental activities and promote a better understanding of aboriginal and northern affairs. The unfavourable economic and operating conditions of 1991 affected financial performance. An 11.8% rate increase was announced for 1992. Electricity demand increased by 1.3%over 1990 to 139.1 million megawatt hours. Major capital additions have been deferred by at least seven years. Uranium contracts were canceled with Rio Algom and Denison Mines. Administrative and support budgets were cut, and executive salaries frozen. A number of quality improvement programs have been implemented with the cooperation of labour groups, reducing the amount of time needed for the retubing of the Pickering-4 reactor. (L.L.)

  8. The EC6 - an enhanced mid-sized reactor with fuel cycle applications

    International Nuclear Information System (INIS)

    Soulard, M.; Yu, S.; Hopwood, J.; Hastings, I.J.

    2011-01-01

    Atomic Energy of Canada Limited (AECL) has two CANDU reactor products matched to markets: the Enhanced CANDU 6 (EC6), a modern 700 MWe-class design, and the Advanced CANDU Reactor (ACR-1000), a 1200 MWe-class Gen III+ design. Both reactor types are designed to meet both market-, and customer-driven needs; the ACR-1000 design is 90% complete and market-ready. The EC6 incorporates the CANDU 6's well-proven features, and adds enhancements that make the reactor even safer and easier to operate. The EC6 is the only mid-sized reactor with a proven pedigree that meets modern reactor expectations and regulatory standards. It is sized for smaller grids and also has outstanding fuel-cycle capability. The EC6 has domestic and offshore market pull and is the current focus of AECL's development program; market interest in the ACR-1000 is anticipated in the longer term. Some of the key features incorporated into the EC6 include upgrading containment and seismic capability to meet modern standards, shortening the overall project schedule, addressing obsolescence issues, optimizing maintenance outages and incorporating lessons learnt through feedback obtained from the operating plants. The EC6 utilizes modern computers and a distributed control system housed in an advanced control room which, along with automated testing and on-line diagnostics, make the plant easier and safer to operate, with minimal operator intervention. The first deployment of the EC6 is anticipated in Canada; off-shore markets are also being pursued. The EC6 burns natural uranium as standard. But, high neutron economy, on-power refuelling, a simple fuel bundle, and the fundamental CANDU fuel channel design provide the EC6 with the flexibility to accommodate a range of advanced fuels. (author)

  9. Energy for the future

    International Nuclear Information System (INIS)

    1982-01-01

    The history of electrical energy production in Ontario and the surge of energy needs; water, coal and nuclear power are discussed. A look at CRNL, NPD, Pickering A and Bruce B stations is presented. The fission process is explained as well

  10. Enhanced candu 6 reactor: status

    International Nuclear Information System (INIS)

    Azeez, S.; Girouard, P.

    2006-01-01

    The CANDU 6 power reactor is visionary in its approach, renowned for its on-power refuelling capability and proven over years of safe, economical and reliable power production. Developed by Atomic Energy of Canada Limited (AECL), the CANDU 6 design offers excellent performance utilizing state-of-the-art technology. The first CANDU 6 plants went into service in the early 1980s as leading edge technology and the design has been continuously advanced to maintain superior performance with an outstanding safety record. The first set of CANDU 6 plants - Gentilly 2 and Point Lepreau in Canada, Embalse in Argentina and Wolsong- Unit 1 in Korea - have been in service for more than 22 years and are still producing electricity at peak performance; to the end of 2004, their average Lifetime Capacity Factor was 83.2%. The newer CANDU 6 units in Romania (Cernavoda 1), Korea (Wolsong-Units 2, 3 and 4) and Qinshan (Phase III- Units 1 and 2) have also been performing at outstanding levels. The average lifetime Capacity Factor of the 10 CANDU 6 operating units around the world has been 87% to the end of 2004. Building on these successes, AECL is committed to the further development of this highly successful design, now focussing on meeting customers' needs for reduced costs, further improvements to plant operation and performance, enhanced safety and incorporating up-to-date technology, as warranted. This has resulted in AECL embarking on improving the CANDU 6 design through an upgraded product termed the ''Enhanced CANDU 6'' (EC6), which incorporates several attractive but proven features that make the CANDU 6 reactor even more economical, safer and easier to operate. Some of the key features that are being incorporated into the EC6 include increasing the plant's power output, shortening the overall project schedule, decreasing the capital cost, dealing with obsolescence issues, optimizing maintenance outages and incorporating lessons learnt through feedback obtained from the

  11. Experimental and inspection facilities in post-irradiation of spent fuel pools for the analysis of the behaviour of nuclear fuels in power reactors

    International Nuclear Information System (INIS)

    Ruggirello, G.; Zawerucha, A.

    1992-01-01

    Since the beginning of the Atomic Nuclear Reactors (PHWR) Atucha I and Embalse in Argentine are employed different techniques for the knowing of the fuel bundles performances. It is detailed the facilities on post-irradiation examination. The techniques described are: online measurements, visual inspections, identifications of defective fuels and rods assemblies in spent fuel pools. This controls have made possible the feed-back to the manufactory process and the changes in the manufactory quality controls. (author)

  12. The power control system of the Siemens-KWU nuclear power station of the PWR [pressurized water reactors] type

    International Nuclear Information System (INIS)

    Huber, Horacio

    1989-01-01

    Starting with the first nuclear power plant constructed by Siemens AG of the pressurized light water reactor line (PWR), the Obrigheim Nuclear Power Plant (340 MWe net), until the recently constructed plants of 1300 MWe (named 'Konvoi'), the design of the power control system of the plant was continuously improved and optimized using the experience gained in the operation of the earlier generations of plants. The reactor power control system of the Siemens - KWU nuclear power plants is described. The features of this design and of the Siemens designed heavy water power plants (PHWR) Atucha I and Atucha II are mentioned. Curves showing the behaviour of the controlled variables during load changes obtained from plant tests are also shown. (Author) [es

  13. Seven steps to an energy efficient Ontario

    International Nuclear Information System (INIS)

    2003-01-01

    The future of the electricity market in Ontario is examined in light of the recent debate concerning deregulation. This report focuses on measures that would have to be taken to ensure that there will be sufficient electricity available to serve the needs of Ontario. Increasing supply, or decreasing demand are discussed as the obvious answers to the problem at hand. The report concludes that: (1) mechanisms to encourage Demand Side Management and Demand Response have all but disappeared since the opening of the competitive electricity market in Ontario, (2) the current market structure does nothing to stimulate increased supply, nor does it encourage measures to reduce demand; as such, the result is an unsustainable situation. The report further concludes that Demand Side Management and Demand Response programs are essential components of the success of Ontario's evolving electricity market, and recommends programs that are designed and implemented in a manner that dovetail with parallel policies dealing with supply challenges. Seven essential elements of such a policy are discussed. These are: (1) vision and a clear set of goals for demand side management; (2) appropriate market drivers, principles and pricing incentives; (3) a central co-ordinating authority for managing demand side management; (4) appropriate implementation agents to manage programs and processes; (5) incentives to motivate change; (6) widespread education of the market; and (7) appropriate tactics to enable demand side management in sectors

  14. Online control loop tuning in Pickering Nuclear Generating Stations

    International Nuclear Information System (INIS)

    Yu, K.X.; Harrington, S.

    2008-01-01

    Most analog controllers in the Pickering B Nuclear Generating Stations adopted PID control scheme. In replacing the analog controllers with digital controllers, the PID control strategies, including the original tuning parameters were retained. The replacement strategy resulted in minimum effort on control loop tuning. In a few cases, however, it was found during commissioning that control loop tuning was required as a result of poor control loop performance, typically due to slow response and controlled process oscillation. Several factors are accounted for the necessities of control loop re-tuning. Our experience in commissioning the digital controllers showed that online control tuning posted some challenges in nuclear power plant. (author)

  15. Electrosleeve process for in-situ nuclear steam generator repair

    International Nuclear Information System (INIS)

    Barton, R.A.; Moran, T.E.; Renaud, E.

    1997-01-01

    Degradation of steam generator (SG) tubing by localized corrosion is a widespread problem in the nuclear industry that can lead to costly forced out-ages, unit de-rating, SG replacement or even the permanent shutdown of a reactor. In response to the onset of SG tubing degradation at Ontario Hydro's Pickering Nuclear Generating Station (PNGS) Unit 5, and the determined unsuitability of conventional repair methods (mechanically expanded or welded sleeves) for Alloy 400, an alternative repair technology was developed. Electrosleeve is a non-intrusive, low-temperature process that involves the electrodeposition of a nanocrystalline nickel microalloy forming a continuously bonded, structural layer over the internal diameter of the degraded region. This technology is designed to provide a long-term pressure boundary repair, fully restoring the structural integrity of the damaged region to its original state. This paper describes the Electrosleeve process for SG tubing repair and the unique properties of the advanced sleeve material. The successful installation of Electrosleeves that have been in service for more than three years in Alloy 400 SG tubing at the Pickering-5 CANDU unit, the more recent extension of the technology to Alloy 600 and its demonstration in a U.S. pressurized water reactor (PWR), is presented. A number of PWR operators have requested plant operating technical specification changes to permit Electrosleeve SG tube repair. Licensing of the Electrosleeve by the U.S. Nuclear Regulatory Commission (NRC) is expected imminently. (author)

  16. Investigation of fluid flow in various geometries related to nuclear reactor using PIV system

    International Nuclear Information System (INIS)

    Kansal, A.K.; Maheshwari, N.K.; Singh, R.K.; Vijayan, P.K.; Saha, D.; Singh, R.K.; Joshi, V.M.

    2011-01-01

    Particle Image Velocimetry (PIV) is a non-intrusive technique for simultaneously measuring the velocities at many points in a fluid flow. The PIV system used is comprised of Nd:YAG laser source, CCD (Charged Coupled Device) camera, timing controller (to control the laser and camera) and software used for analyzing the flow velocities. Several case studies related to nuclear reactor were performed with the PIV system. Some of the cases like flow in circular tube, submerged jet, natural convection in a water pool, flow field of moderator inlet diffuser of 500 MWe Pressurised Heavy Water Reactor (PHWR) and fluidic flow control device (FFCD) used in advanced accumulator of Emergency Core Cooling System (ECCS) have been studied using PIV system. Theoretical studies have been performed and comparisons with PIV results are also given in the present studies. (author)

  17. Implications of the Ontario government's white paper and competition strategies for Ontario's municipal electric utilities

    International Nuclear Information System (INIS)

    Wills, D.L.

    1998-01-01

    The strategies that Municipal Electric Utilities (MEU) should follow to deal with competition were discussed. North Bay Hydro is the 34th largest MEU out of 300 in Ontario but it serves only 23,000 out of 4 million electrical customers in Ontario. Therefore, the main strategy for municipal utilities to ensure their future would be to become part of an alliance and association like the MEA and the SAC - the Strategic Alliance for Competition and Customer Choice. Strong criticism was voiced regarding the contents of the recent Ontario Government White Paper for being vague with regard to electrical distribution and the role of MEUs in Ontario. It was suggested that it is vitally important that MEUs ally themselves with other stakeholders, to resist an Ontario Hydro monopoly, to make sure that prices stay low, to avoid excessive debt and bureaucratic inefficiency, be innovative, and consumer oriented and be prepared to anticipate events and conditions. 3 figs

  18. Networks of recyclable material waste-picker's cooperatives: an alternative for the solid waste management in the city of Rio de Janeiro.

    Science.gov (United States)

    Tirado-Soto, Magda Martina; Zamberlan, Fabio Luiz

    2013-04-01

    The objective of this study is to discuss the role of networks formed of waste-picker cooperatives in ameliorating problems of final disposal of solid waste in the city of Rio de Janeiro, since the city's main landfill will soon have to close because of exhausted capacity. However, it is estimated that in the city of Rio de Janeiro there are around five thousand waste-pickers working in poor conditions, with lack of physical infrastructure and training, but contributing significantly by diverting solid waste from landfills. According to the Sustainable Development Indicators (IBGE, 2010a,b) in Brazil, recycling rates hover between 45% and 55%. In the municipality of Rio de Janeiro, only 1% of the waste produced is collected selectively by the government (COMLURB, 2010), demonstrating that recycling is mainly performed by waste-pickers. Furthermore, since the recycling market is an oligopsony that requires economies of scale to negotiate directly with industries, the idea of working in networks of cooperatives meets the demands for joint marketing of recyclable materials. Thus, this work presents a method for creating and structuring a network of recycling cooperatives, with prior training for working in networks, so that the expected synergies and joint efforts can lead to concrete results. We intend to demonstrate that it is first essential to strengthen the waste-pickers' cooperatives in terms of infrastructure, governance and training so that solid waste management can be environmentally, socially and economically sustainable in the city of Rio de Janeiro. Copyright © 2012 Elsevier Ltd. All rights reserved.

  19. Corrosion of heat exchanger materials under heat transfer conditions

    International Nuclear Information System (INIS)

    Tapping, R.L.; Lavoie, P.A.; Disney, D.J.

    1987-01-01

    Severe pitting has occurred in moderator heat exchangers tubed with Incoloy-800 in Pickering Nuclear Generating Station. The pitting originated on the cooling side (outside) of the tubes and perforation occurred in less than two years. It was known from corrosion testing at CRNL that Incoloy-800 was not susceptible to pitting in Lake Ontario water under isothermal conditions. Corrosion testing with heat transfer across the tube wall was carried out, and it was noted that severe pitting could occur under deposits formed on the tubes in silty Lake Ontario water. Subsequent testing, carried out in co-operation with Ontario Hydro Research Division, investigated the pitting resistance of other candidate tubing alloys: Incoloy-825, 904 L stainless steel, AL-6X, Inconel-625, 70:30 Cu:Ni, titanium, Sanicro-30 and Sanicro-28 1 . Of these, only titanium and Sanicro-28 have not suffered some degree of pitting attack in silt-containing Lake Ontario Water. In the absence of silt, and hence deposits, no pitting took place on any of the alloys tested

  20. Arresting relaxation in Pickering Emulsions

    Science.gov (United States)

    Atherton, Tim; Burke, Chris

    2015-03-01

    Pickering emulsions consist of droplets of one fluid dispersed in a host fluid and stabilized by colloidal particles absorbed at the fluid-fluid interface. Everyday materials such as crude oil and food products like salad dressing are examples of these materials. Particles can stabilize non spherical droplet shapes in these emulsions through the following sequence: first, an isolated droplet is deformed, e.g. by an electric field, increasing the surface area above the equilibrium value; additional particles are then adsorbed to the interface reducing the surface tension. The droplet is then allowed to relax toward a sphere. If more particles were adsorbed than can be accommodated by the surface area of the spherical ground state, relaxation of the droplet is arrested at some non-spherical shape. Because the energetic cost of removing adsorbed colloids exceeds the interfacial driving force, these configurations can remain stable over long timescales. In this presentation, we present a computational study of the ordering present in anisotropic droplets produced through the mechanism of arrested relaxation and discuss the interplay between the geometry of the droplet, the dynamical process that produced it, and the structure of the defects observed.

  1. Information management for maintenance of instrument calibration data

    International Nuclear Information System (INIS)

    Tam, Y.

    1995-01-01

    This paper discusses the rationale for developing a calibration information system at Ontario Hydro Pickering Nuclear Division (PND), including the approach to calibration information problems, the identification of existing processes, discovery of alternatives, selection of the best alternative and project development. (author)

  2. Histidine-functionalized carbon-based dot-Zinc(II) nanoparticles as a novel stabilizer for Pickering emulsion synthesis of polystyrene microspheres.

    Science.gov (United States)

    Ruiyi, Li; Zaijun, Li; Junkang, Liu

    2017-05-01

    Carbon-based dots (CDs) are nanoparticles with size-dependent optical and electronic properties that have been widely applied in energy-efficient displays and lighting, photovoltaic devices and biological markers. However, conventional CDs are difficult to be used as ideal stabilizer for Pickering emulsion due to its irrational amphiphilic structure. The study designed and synthesized a new histidine-functionalized carbon dot-Zinc(II) nanoparticles, which is termed as His-CD-Zn. The His-CD was made via one-step hydrothermal treatment of histidine and maleic acid. The His-CD reacted with Zn 2+ to form His-CD-Zn. The as-prepared His-CD-Zn was used as a solid particle surfactant for stabilizing styrene-in-water emulsion. The Pickering emulsion exhibits high stability and sensitive pH-switching behaviour. The introduction of S 2 O 8 2- triggers the emulsion polymerization of styrene. The resulted polystyrene microsphere was well coated with His-CDs on the surface. It was successfully used as an ideal adsorbent for removal of heavy metallic ions from water with high adsorption capacity. The study also provides a prominent approach for fabrication of amphiphilic carbon-based nanoparticles for stabilizing Pickering emulsion. Copyright © 2017 Elsevier Inc. All rights reserved.

  3. Fabrication of metallic fuel for fast breeder reactor

    International Nuclear Information System (INIS)

    Saify, M.T.; Jha, S.K.; Abdulla, K.K.; Kumar, Arbind; Mittal, R.K.; Prasad, R.S.; Mahule, N.; Kumar, Arun; Prasad, G.J.

    2012-01-01

    Natural uranium oxide fuelled PHWRs comprises of first stage of Indian nuclear power programme. Liquid metal fast breeder reactors fuelled by Pu (from PHWR's) form the second stage. A shorter reactor doubling time is essential in order to accelerate the nuclear power growth in India. Metallic fuels are known to provide shorter doubling times, necessitating to be used as driver fuel for fast breeder reactors. One of the fabrication routes for metallic fuels having random grain orientation, is injection casting technique. The technique finds its basis in an elementary physical concept - the possibility of supporting a liquid column within a tube, by the application of a pressure difference across the liquid interface inside and outside the tube. At AFD, BARC a facility has been set-up for injection casting of uranium rods in quartz tube moulds, demoulding of cast rods, end-shearing of rods and an automated inspection system for inspection of fuel rods with respect to mass, length, diameter and diameter variation along the length and internal and external porosities/voids. All the above facilities have been set-up in glove boxes and have successfully been used for fabrication of uranium bearing fuel rods. The facility has been designed for fabrication and inspection of Pu-bearing metallic fuels also, if required

  4. Pickering G.S. boiler repair: an example of planned maintenance

    International Nuclear Information System (INIS)

    Dalrymple, D.G.

    1976-04-01

    The first application of boiler repair tools and procedures is estimated to have yielded a four-fold return on the development investment. The need to develop such technology is a result of the environment in which boiler repairs must be made. As nuclear technology evolves and plants and components get bigger, equipment will increasingly have to be repaired in situ with minimum plant downtime and minimum exposure of repair personnel to radiation. This lecture traces development of the Pickering A boiler repair capability which is seen as an example of how utility and contractor should interact to anticipate and meet maintenance requirements. (author)

  5. Development of high pressure conductivity probe (HPCP) for secondary shut down system (SDS-2) of 500 MWe PHWR

    International Nuclear Information System (INIS)

    Sapra, M.K.; Kundu, S.; Mohan, L.R.

    2003-09-01

    The poison solution and the moderator in Secondary Shutdown System (SDS-2) of 500 MWe PHWR, are separated by their own liquid in liquid interface. This interface moves towards the calandria because of molecular diffusion, temperature difference and physical disturbances in the moderator level. It is proposed to install two numbers of high pressure conductivity probes (HPCP) to monitor the interface movement as well as to provide the safe annunciation value for interface location. On actuation of the SDS-2 signal, high-pressure helium will inject the poison into the moderator to shutdown the reactor. During poison injection, these probes will experience high pressure of nearly 85 kg/sq.cm. Global market survey indicated that conductivity probes having built in temperature sensor are available for a maximum pressure rating of 35 kg/sq.cm. Hence in order to meet the process requirement of SDS-2, the development of HPCP suitable for a pressure of 85 kg/sq.cm. was taken up. Two numbers of such probes were successfully designed, fabricated and evaluated for their performance. The developed conductivity probes fully meet the laid design and performance criteria. The aforesaid development work was a successful endeavour towards indigenisation of high-pressure conductivity probe for future applications. This report deals with the design aspects, fabrication technique, material and performance evajuation criteria and test results of HPCP. (author)

  6. Ontario's power market post November 11

    International Nuclear Information System (INIS)

    Murphy, P.

    2003-01-01

    This paper provides a review of Ontario's first year with an open electricity market. The year 2002 to 2003 had record energy demands with challenges on the supply side. In particular, generation availability was below expectations during the summer months. This demonstrated that price predictability and volatility needs to be addressed and investment in new power generation is needed in Ontario. Ontario demand forecasts outpace supply for the long term outlook. In addition, most of Ontario's generating plants are aging and will soon exceed their nominal service life, requiring major refurbishment or replacement. Decisions are needed now on the future of coal in Ontario's generation mix. It was also noted that transmission reinforcements are needed in the Greater Toronto Area (GTA). In the short term, consumers can expect delays in return to service of nuclear units, forced extensions to planned outages, and reduced outlook for energy from hydroelectric resources. It was noted that Ontario will continue to rely on imports, although emergency generation is being installed. 5 figs

  7. New fuel advanced heavy water reactors

    International Nuclear Information System (INIS)

    Notari, Carla

    1999-01-01

    A redesign of the PHWR fuel element (FE) to be used in all Argentine nuclear power plants has been proposed elsewhere. This new FE presents several characteristics aimed to an improved in-core performance and economical benefits derived from the unification of most of the fabrication processes that today constitute two different production lines: one for Embalse nuclear power plant CANDU type fuel and another for Atucha I. Atucha I and Embalse, the two operating nuclear power plants in Argentina, are PHWR of different conception. Atucha I (357 M we) is of pressure vessel type and the fuel elements are full-length assemblies (530 cm of active length) with 36 uranium rods in the cluster and a support one in the outer ring. Embalse (648 M we) is a CANDU pressure tube reactor fuelled with the well known 37 rod / 50 cm length fuel bundles, twelve of which are loaded in each channel. The more relevant changes in the proposed design are an increased subdivision of the fuel material in 52 rods and a 100 cm long bundle. The combined features give the adequate channel pressure drop. The proposed CARA design shows a superior neutronic performance than the standard PHWR fuel elements currently used in Atucha I and Embalse nuclear power plants. A variant of the CARA FE consisting in the elimination of the central four rods, leaving 48 rods and a central free space, is strongly recommended because it saves materials (less uranium, less sheaths) with no loss of burnup. The central D 2 O zone allows a better utilization of the inner rods and compensates the diminished uranium loading. In Embalse no differences in core physics are expected except the beneficial decrease in linear power density. In Atucha I besides the lower power density, a higher exit burnup appears as a consequence of the higher uranium inventory. The exit burnup figures have been calculated with cell and reactor models and the result is that similar fuel management schemes as the proposed for Atucha I for the

  8. Ontario Energy Corporation annual report 1981. [Monograph

    Energy Technology Data Exchange (ETDEWEB)

    1981-01-01

    The Ontario Energy Corporation's mission of providing leadership and investment capital for selected energy ventures brought its total participation in projects from $16.4 million to $669 million, and its total assets increased from $44.4 million to $693 million during the year. The annual report review major operations with Ontario Energy Resources Ltd., Onexco Ltd., Ontario Alternate Energy Ltd., Ontario Power Share Ltd., and Ontario Energy in Transportation Ltd. The financial report includes a balance sheet, income and retained earnings statement, and a summary of financial changes during the reporting period. 1 figure, 4 tables. (DCK)

  9. Pickering NGS emergency water supply system emergency start flow simulation and experiment

    Energy Technology Data Exchange (ETDEWEB)

    Davidge, E.; Misra, A. [Ontario Power Generation Inc., Nuclear Safety Analysis & Technology Department, Toronto, Ontario (Canada)

    2012-07-01

    A proposed modification to the OPG Pickering Nuclear Generation Station Emergency Water Supply (EWS) system was analyzed using the Industry Standard Toolset code GOTHIC to determine the acceptability of the proposed system configuration during pump start-up. The new configuration of the system included a vertical dead-ended pipe, initially filled with air. The simulation demonstrated that no significant water hammer effects were predicted and tests performed with the new configuration confirmed the analysis results. (author)

  10. Proceedings of the 44. annual Ontario Petroleum Institute's oil and gas conference

    International Nuclear Information System (INIS)

    2005-01-01

    This annual conference focused on developments related to the Ontario Petroleum industry. Issues concerning hydrocarbon potential were examined as well as geological information related to oil and gas activities in the region. The conference was divided into 6 sessions. Session 1 provided updates on employment issues in Ontario's oil and gas industry with respect to regulations and staffing as well as an update of issues concerning the geosciences profession in the province. Session 2 examined approaches to predictive geochemistry for buried gas and oil targets. Session 3 presented a comparison of Cambrian reservoir rocks as well as details of a natural channel realignment project. Session 4 presented details of new renewable technologies for the Ontario petroleum industry as well as a regional stratigraphic synthesis for the Paleozoic of southern Ontario. Session 5 provided a primer on tax rules, workers industry needs and an update on training delivery. Session 6 examined approaches to contaminant control. A study of hydrodynamics at the ice-bed interface was also presented. The conference featured 13 presentations, of which 3 have been catalogued separately for inclusion in this database. refs., tabs., figs

  11. Experiences and lessons learnt on staffing from the first Indian nuclear power plant (PHWR)

    International Nuclear Information System (INIS)

    Bhattacharya, A.S.

    2001-01-01

    Three decades of operating experience in India has led to sustained high performance of NPPs. The staffing modules and policies are standardised. The basic functions of operation, maintenance, technical support and quality assurance are carried out by a team of 727 in-plant persons (for a 2 x 220 MW PHWR station) organised at five levels, for fifty positions in ten job families. Specific qualification levels apply to each position - six at management positions, five licensed positions with the rest qualified through an equivalent training scheme. Practically all O and M activities are carried out on-site by the utility manpower with minimum involvement of contractors. The entire process of human resource development is in-house - with each NPP organisation comprised of 30% experienced staff transferred from older NPPs and 70% totally developed out of fresh recruits. Four to eight years lead time goes to qualify fresh recruits depending on the position. This optimisation of manpower is a result of continuous learning - through operating experience and regulatory feed back and self assessment for (i) optimising quantum of work load and (ii) improving productivity. For the first category, design improvements over older NPP's increased reliability, operability, maintainability and human factors are described separately in the companion paper. In this paper the organisation factors are discussed, starting with the initial lessons that demanded improved management and enhanced quality programmes and caused temporarily, high demand of staffing for bringing out new systems, e.g., (i) attaining maturity of units; (ii) standardising training, retraining and cross training and qualifications; (in) job rotations, (iv) in service inspection of reactor components; (v) quality audits. The experiences on subsequent optimisation of staffing levels are outlined. (author)

  12. Modelling of oxidation and hydriding behaviour of Zircaloy-2 pressure tubes in PHWR

    International Nuclear Information System (INIS)

    Sah, D.N.; Sunil Kumar; Khan, K.B.

    2002-01-01

    A computer model named DOCTOR (Deuteriding of Coolant Tubes during Operation of Reactor) has been developed for predicting the axial profile of oxide thickness and hydrogen (Deuterium) concentration in PHWR pressure tubes. This model is applicable to single channel or full core analysis. The main source of hydrogen is considered to be oxidation of pressure tube on the i.d. surface by high temperature coolant water. Three stages of oxidation is considered namely, pre- transition, post transition and accelerated. Oxidation rate is considered to be dependent on channel power, axial power/flux distribution, coolant temperature and pre-existing oxide thickness at the location. The kinetics parameters for oxidation model are derived from the actual measurement of oxide thickness on a number of pressure tubes examined in PIE Division. The input data required for the model are: channel power, channel power factor, axial flux distribution, coolant inlet temperature, critical oxide thickness, hydrogen pick up fraction, initial hydrogen in the material and time of operation (efpy). The model calculates the oxide layer thickness on the inside surface of the pressure tube along the length. The amount of hydrogen picked up by the pressure tube is calculated from the oxide thickness using hydrogen pick up fraction determined from the PIE data. The pressure tube length is divided into a number of axial segments for calculation. The temperature and fast neutron flux assumed to be constant in a given segment. The axial temperature profile calculated from the axial power profile in the channel is used for calculating the oxidation rate at various locations in the pressure tube. The model has been validated with PIE data of hydrogen equivalent measurement on a number of irradiated Zircaloy-2 pressure tubes of various PHWRs. The performance of the model in predicting the axial profile of hydrogen in the pressure tubes has been found to be good. (author)

  13. Assessment of field training for nuclear operations personnel

    Energy Technology Data Exchange (ETDEWEB)

    White, M [Safety Management Services, Inc. (Canada)

    1995-08-01

    Training of station personnel is an important component of the safe operation of the nuclear generating station. On-the-job training (OJT) is an important component of training. The AECB initiated this project to develop a process to assess the effectiveness of OJT for field operators, and perform an initial trial of the developed process. This report describes the recommended process to assess the effectiveness of OJT for field operators, as well as the results of the initial assessment at Pickering Nuclear Generating Station. The assessment`s conclusions included: (1) Ontario Hydro policies and procedures are generally consistent with industry guidelines requiring a systematic approach to training; (2) Pickering NGS field operator performance is not always consistent with documented station requirements and standards, nor industry guidelines and practices; and (3) The Pickering NGS field operator on-the-job training is not consistent with a systematic approach to training, a requirement recognized in Ontario Hydro`s Policy NGD 113, and does not contribute to a high level of performance in field operator tasks. Recommendations are made regarding the use of the developed process for future assessments of on-the-job training at nuclear power plants. (author). 36 refs., 4 tabs., 3 figs.

  14. Reactor noise analysis applications in NPP I and C systems

    Energy Technology Data Exchange (ETDEWEB)

    Gloeckler, O. [International Atomic Energy Agency, Wagramer Strosse 5, A-1400 Vienna, Austria Ontario Power Generation, 230 Westney Road South, Ajax, Ont. L1S 7R3 (Canada)

    2006-07-01

    Reactor noise analysis techniques are used in many NPPs on a routine basis as 'inspection tools' to get information on the dynamics of reactor processes and their instrumentation in a passive, non-intrusive way. The paper discusses some of the tasks and requirements an NPP has to take to implement and to use the full advantages of reactor noise analysis techniques. Typical signal noise analysis applications developed for the monitoring of the reactor shutdown system and control system instrumentation of the Candu units of Ontario Power Generation and Bruce Power are also presented. (authors)

  15. Ontario feed-in-tariff programs

    International Nuclear Information System (INIS)

    Yatchew, Adonis; Baziliauskas, Andy

    2011-01-01

    Recent feed-in-tariff (FIT) programs in Ontario, Canada have elicited a very strong supply response. Within the first year of their inception, the Ontario Power Authority received applications totaling over 15,000 MW, equivalent to about 43% of current Ontario electricity generating capacity. The overwhelming share of applications is for wind-power (69%) and solar photovoltaic (28%) generating facilities. Wind generation is being remunerated at 14-19 cents /kWh. Solar facilities receive from 40 to 80 cents /kWh. The initiative, which responds to Provincial legislation is administratively divided into applications for facilities exceeding 10 kW (the FIT program) and those less than or equal to 10 kW (the microFIT program). This paper describes the programs and their features, compares them to their predecessors in Ontario as well as to programs elsewhere, analyses the reasons for the very strong response, and assesses their efficacy and sustainability. - Research highlights: → Recent feed-in-tariff (FIT) programs in Ontario, Canada have elicited a very strong supply response. Within the first year, applications totaled over 15,000 MW, equivalent to about 43% of current Ontario electricity generating capacity. → Most projects are either solar or wind. → Likely causes of strong supply response-preferred system access and favorable, secure tariffs. (Wind generation is being remunerated at 14-19 cents /kWh. Solar facilities receive from 40 to 80 cents /kWh.) → Long term political sustainability of present program is in question.

  16. Impact of Ontario electricity industry structure on the viability of cogeneration projects

    International Nuclear Information System (INIS)

    Chuddy, B.

    1999-01-01

    A review of Ontario Hydro's existing market structure and how its move toward a more competitive profile can be advantageous for cogeneration projects was presented. Ontario's existing electric power supply is as follows: 6 fossil fuels stations generate a total of 9, 969 MW of electricity, 23 NUG stations generate 1,541 MW, 3 nuclear stations generate a total of 9,028 MW and 69 hydro-electric stations generates 6,751 MW of electricity. The criteria and characteristics for cogeneration projects were listed. The paper also discussed other topics such as the market price of power, outstanding regulatory issues, market volatility and relative pricing. The prognosis for Ontario cogeneration projects for the early years from 1999-2004 is that for economic reasons, only big projects with large loads of 200 to 800 MW will be considered. In later years, other projects will become economic

  17. A study for the domestic application plan of the Generic Safety Issue(GSI) for the Pressurized Heavy Water Reactor

    International Nuclear Information System (INIS)

    Lee, Un Chul; Jang, Jin Wook; Lee, Sang Kyung; Lee, Doo Yong; Park, Chang Hwan

    2002-03-01

    In this study, a base work to construct the database of the domestic and foreign GSls were done through performing the deviation of GSls for the PHWR by investigating the development trend of international joint studies and the GSls of 4 countries as the PHWR state and examined the IAEA acceptance of GSls classification for the GSls of Canada, Korea Republic of, Argentina and India. We evaluated the possibility of application of the safety Issue for PHWR by investigating causes, contents and follow-up measures of each items. To evaluate the domestic application validity of the safety issue, We made the investigation matrix for the safety issue of each countries and also are reflecting new results in investigation matrix by examining IAEA PHWR GSI development trend. We intended to derive the GSls which are most appropriate in our PHWR by examining every issues. the derived GSls are divided into the design parts and the operation parts. And they have to be solved as soon as possible

  18. A study for the domestic application plan of the Generic Safety Issue(GSI) for the Pressurized Heavy Water Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Un Chul; Jang, Jin Wook; Lee, Sang Kyung; Lee, Doo Yong; Park, Chang Hwan [Seoul National Univ., Seoul (Korea, Republic of)

    2002-03-15

    In this study, a base work to construct the database of the domestic and foreign GSls were done through performing the deviation of GSls for the PHWR by investigating the development trend of international joint studies and the GSls of 4 countries as the PHWR state and examined the IAEA acceptance of GSls classification for the GSls of Canada, Korea Republic of, Argentina and India. We evaluated the possibility of application of the safety Issue for PHWR by investigating causes, contents and follow-up measures of each items. To evaluate the domestic application validity of the safety issue, We made the investigation matrix for the safety issue of each countries and also are reflecting new results in investigation matrix by examining IAEA PHWR GSI development trend. We intended to derive the GSls which are most appropriate in our PHWR by examining every issues. the derived GSls are divided into the design parts and the operation parts. And they have to be solved as soon as possible.

  19. [Ontario Hydro]. Corporate performance report, 1993

    International Nuclear Information System (INIS)

    1994-01-01

    Summarizes Ontario Hydro's corporate performance for the year, with actual results being compared against planned values established in the approved corporate financial plan and work program budget. Also includes additional indicators that illustrate noteworthy trends in corporate performance. Corporate results are reported under the new organizational structure implemented in mid-1993, beginning with overall results in such areas as customer satisfaction, electricity sales, human resources, and environmental protection. This is followed by reports from the Electricity Group (supply, generation, transmission), the Energy Services and Environment Group (load saved and shifted, non-utility generation, retail distribution), and Ontario Hydro enterprises (Ontario Hydro Technologies, Ontario Hydro International). The appendix contains summary financial statements

  20. CANDU reactor - supporting the nuclear renaissance

    International Nuclear Information System (INIS)

    Oberth, R.

    2010-01-01

    'Full text:' The CANDU reactor has proven to be a strong performer in both the Canada, with 22 units constructed in Ontario, New Brunswick and Quebec, as well as in Argentina, Korea, Romania and China where a further nine units are operating and two in the planning stage. The average lifetime capacity factor of the CANDU reactor fleet is 89%. The last seven CANDU projects in Korea, China, and Romania have been completed on budget and on schedule. CANDU reactors have the highest uranium utilization efficiency measures as electricity output per ton of uranium mined. The CANDU fuel channel design using on-power fuelling and a heavy water moderator enables flexible fueling options - from the current natural uranium option to burning uranium recovered from used LWR reactor fuel and even a thorium-based fuel. AECL and the CANDU reactor are poised to participate in the worldwide construction at least 250 new reactors over the next 20 years. (author)

  1. Reactor physics verification of the MCNP6 unstructured mesh capability

    International Nuclear Information System (INIS)

    Burke, T. P.; Kiedrowski, B. C.; Martz, R. L.; Martin, W. R.

    2013-01-01

    The Monte Carlo software package MCNP6 has the ability to transport particles on unstructured meshes generated from the Computed-Aided Engineering software Abaqus. Verification is performed using benchmarks with features relevant to reactor physics - Big Ten and the C5G7 computational benchmark. Various meshing strategies are tested and results are compared to reference solutions. Computational performance results are also given. The conclusions show MCNP6 is capable of producing accurate calculations for reactor physics geometries and the computational requirements for small lattice benchmarks are reasonable on modern computing platforms. (authors)

  2. Reactor physics verification of the MCNP6 unstructured mesh capability

    Energy Technology Data Exchange (ETDEWEB)

    Burke, T. P. [Department of Nuclear Engineering and Radiological Sciences, University of Michigan, 2355 Bonisteel Boulevard, Ann Arbor, MI 48109 (United States); Kiedrowski, B. C.; Martz, R. L. [X-Computational Physics Division, Monte Carlo Codes Group, Los Alamos National Laboratory, P.O. Box 1663, Los Alamos, NM 87545 (United States); Martin, W. R. [Department of Nuclear Engineering and Radiological Sciences, University of Michigan, 2355 Bonisteel Boulevard, Ann Arbor, MI 48109 (United States)

    2013-07-01

    The Monte Carlo software package MCNP6 has the ability to transport particles on unstructured meshes generated from the Computed-Aided Engineering software Abaqus. Verification is performed using benchmarks with features relevant to reactor physics - Big Ten and the C5G7 computational benchmark. Various meshing strategies are tested and results are compared to reference solutions. Computational performance results are also given. The conclusions show MCNP6 is capable of producing accurate calculations for reactor physics geometries and the computational requirements for small lattice benchmarks are reasonable on modern computing platforms. (authors)

  3. Viscosity of the oil-in-water Pickering emulsion stabilized by surfactant-polymer and nanoparticle-surfactant-polymer system

    Science.gov (United States)

    Sharma, Tushar; Kumar, G. Suresh; Chon, Bo Hyun; Sangwai, Jitendra S.

    2014-11-01

    Information on the viscosity of Pickering emulsion is required for their successful application in upstream oil and gas industry to understand their stability at extreme environment. In this work, a novel formulation of oil-in-water (o/w) Pickering emulsion stabilized using nanoparticle-surfactant-polymer (polyacrylamide) system as formulated in our earlier work (Sharma et al., Journal of Industrial and Engineering Chemistry, 2014) is investigated for rheological stability at high pressure and high temperature (HPHT) conditions using a controlled-strain rheometer. The nanoparticle (SiO2 and clay) concentration is varied from 1.0 to 5.0 wt%. The results are compared with the rheological behavior of simple o/w emulsion stabilized by surfactant-polymer system. Both the emulsions exhibit non-Newtonian shear thinning behavior. A positive shift in this behavior is observed for surfactant-polymer stabilized emulsion at high pressure conditions. Yield stress is observed to increase with pressure for surfactant-polymer emulsion. In addition, increase in temperature has an adverse effect on the viscosity of emulsion stabilized by surfactant-polymer system. In case of nanoparticle-surfactant-polymer stabilized o/w emulsion system, the viscosity and yield stress are predominantly constant for varying pressure and temperature conditions. The viscosity data for both o/w emulsion systems are fitted by the Herschel-Bulkley model and found to be satisfactory. In general, the study indicates that the Pickering emulsion stabilized by nanoparticle-surfactant-polymer system shows improved and stable rheological properties as compared to conventional emulsion stabilized by surfactant-polymer system indicating their successful application for HPHT environment in upstream oil and gas industry.

  4. Design, development and deployment of special sealing plug for 540 MWe PHWRs

    International Nuclear Information System (INIS)

    Sharma, G.; Roy, S.; Patel, R.J.

    2012-01-01

    The coolant channel in Pressurized Heavy Water Reactors is a pressure boundary component and is very important for reactor performance and reactor safety. Monitoring the condition of the pressure tube of each coolant channel on a periodic basis is very important. In-Service Inspection (ISI) of the coolant channels in water filled condition is done regularly for 220 MWe PHWR. For the same purpose BARC Channel Inspection System is developed for 540 MWe PHWR also. Special Sealing Plug has been developed to facilitate the channel inspection (in water filled condition) with all necessary safety features at par with normal sealing plug. Special Sealing Plug provides a 50 mm through hole for passage of drive tube of Inspection Head maintaining integrity of PHT. Lot of challenges were faced for developing the Special Sealing Plug and its associated tools. It was a first of its kind design. First ISI of TAPS-4 was conducted successfully using this plug along with associated tools in November 2011. This development has provided immense help to NPCIL in life management of 540 MWe PHWR coolant channels. (author)

  5. Waste Picker Organizations and Their Contribution to the Circular Economy: Two Case Studies from a Global South Perspective

    Directory of Open Access Journals (Sweden)

    Jutta Gutberlet

    2017-09-01

    Full Text Available The discussion on the circular economy (CE has attracted a rising interest within global policy and business as a way of increasing the sustainability of production and consumption. Yet the literature mostly portrays a Global North perspective. There is a diverse spectrum of community-based organizations playing important roles in resource recovery and transformation, particularly, but not only, in Global South countries, providing innovative examples for grassroots involvement in waste management and in the CE. This article proposes to add a Southern lens, situated in the context of waste picker organizations, to the concept of CE. The discursive framework in this article couples ecological economy (EE with social/solidarity economy (SSE, focusing not only on environmental sustainability but also on social, economic, political and cultural dimensions involved in production, consumption and discard. We acknowledge that grassroots movements contribute to policy making and improve urban waste management systems. The paper outlines two empirical studies (Argentina, Brazil that illustrate how waste picker organizations perform selective waste collection services, engage with municipalities and industries, and practice the CE. The research reveals that social and political facets need to be added to the debate about the CE, linking environmental management and policy with community development and recognizing waste pickers as protagonists in the CE. Our findings emphasize a need for a change of persisting inequalities in public policy by recognizing the importance of popular waste management praxis and knowledge, ultimately redefining the CE.

  6. Nuclear power programme: development and prospects

    International Nuclear Information System (INIS)

    Prasad, Y.S.R.

    1997-01-01

    The relevance of nuclear power in meeting the short and long term energy needs of India was recognised right at the beginning of the atomic energy programme. From the very beginning, as a long term strategy, the nuclear power programme, formulated by Dr Homi Jehangir Bhabha, embarked on a three stage process linking the fuel cycles of Pressurised Heavy Water Reactor (PHWR) and Fast Breeder Reactor (FBR), and was planned for judicious utilisation of the country's limited uranium ore (78,000 tonne) but vast thorium resources (>360,000 tonne). The emphasis of the programme was on self-reliance and thorium utilisation as a long term objective. India selected Pressurised Heavy Water Reactor (PHWR) because of several inherent advantages. (author)

  7. Expanding worldwide urban solid waste recycling: The Brazilian social technology in waste pickers inclusion.

    Science.gov (United States)

    Rutkowski, Jacqueline E; Rutkowski, Emília W

    2015-12-01

    'If an integrated urban waste management system includes the informal recycling sector (IRS), there is a good chance that more solid waste is recycled' is common sense. However, informal integration brings additional social, environmental, and economic benefits, such as reduction of operational costs and environmental impacts of landfilling. Brazil is a global best practice example in terms of waste picker inclusion, and has received international recognition for its recycling levels. In addition to analysing the results of inclusive recycling approaches, this article evaluates a selection of the best Brazilian inclusive recycling practices and summaries and presents the resulting knowledge. The objective is to identify processes that enable the replication of the inclusion of the informal recycling sector model as part of municipal solid waste management. Qualitative and quantitative data have been collected in 25 Brazilian cities that have contracted waste pickers co-operatives for door-to-door selective collection of recyclables. Field data was collected in action research projects that worked with waste pickers co-operatives between 2006 and 2013. The Brazilian informal recycling sector integration model improves municipal solid waste recycling indicators: it shows an increase in the net tonness recycled, from 140 to 208 t month(-1), at a much lower cost per tonne than conventional selective collection systems. Inclusive systems show costs of US$35 per tonne of recyclables collected, well below the national average of US$195.26. This inclusive model improves the quality of collected material and the efficiency of municipal selective collection. It also diminishes the negative impacts of informal recycling, by reducing child labour, and by improving the conditions of work, occupational health and safety, and uncontrolled pollution. Although treating the Brazilian experience as a blueprint for transfer of experience in every case is unrealistic, the results

  8. Preliminary nuclear decommissioning cost study

    International Nuclear Information System (INIS)

    Sissingh, R.A.P.

    1981-04-01

    The decommissioning of a nuclear power plant may involve one or more of three possible options: storage with surveillance (SWS), restricted site release (RSR), and unrestricted site use(USU). This preliminary study concentrates on the logistical, technical and cost aspects of decommissioning a multi-unit CANDU generating station using Pickering GS as the reference design. The procedure chosen for evaluation is: i) removal of the fuel and heavy water followed by decontamination prior to placing the station in SWS for thiry years; ii) complete dismantlement to achieve a USU state. The combination of SWS and USU with an interim period of surveillance allows for radioactive decay and hence less occupational exposure in achieving USU. The study excludes the conventional side of the station, assumes waste disposal repositories are available 1600 km away from the station, and uses only presently available technologies. The dismantlement of all systems except the reactor core can be accomplished using Ontario Hydro's current operating, maintenance and construction procedures. The total decommissioning period is spread out over approximately 40 years, with major activities concentrated in the first and last five years. The estimated dose would be approximately 1800 rem. Overall Pickering GS A costs would be $162,000,000 (1980 Canadian dollars)

  9. Large catchment area recharges Titan's Ontario Lacus

    Science.gov (United States)

    Dhingra, Rajani D.; Barnes, Jason W.; Yanites, Brian J.; Kirk, Randolph L.

    2018-01-01

    We seek to address the question of what processes are at work to fill Ontario Lacus while other, deeper south polar basins remain empty. Our hydrological analysis indicates that Ontario Lacus has a catchment area spanning 5.5% of Titan's surface and a large catchment area to lake surface area ratio. This large catchment area translates into large volumes of liquid making their way to Ontario Lacus after rainfall. The areal extent of the catchment extends to at least southern mid-latitudes (40°S). Mass conservation calculations indicate that runoff alone might completely fill Ontario Lacus within less than half a Titan year (1 Titan year = 29.5 Earth years) assuming no infiltration. Cassini Visual and Infrared Mapping Spectrometer (VIMS) observations of clouds over the southern mid and high-latitudes are consistent with precipitation feeding Ontario's large catchment area. This far-flung rain may be keeping Ontario Lacus filled, making it a liquid hydrocarbon oasis in the relatively dry south polar region.

  10. Glacial Lake Pickering: stratigraphy and chronology of a proglacial lake dammed by the North Sea Lobe of the British-Irish Ice Sheet

    OpenAIRE

    Evans, David J.A.; Bateman, Mark D.; Roberts, David H.; Medialdea, Alicia; Hayes, Laura; Duller, Geoff A.T.; Fabel, Derek; Clark, Chris D.

    2016-01-01

    We report the first chronology, using four new optically stimulated luminescence dates, on the sedimentary record of Glacial Lake Pickering, dammed by the North Sea Lobe of the British–Irish Ice Sheet during the Dimlington Stadial (24–11 ka cal BP). Dates range from 17.6 ± 1.0 to 15.8 ± 0.9 ka for the sedimentation of the Sherburn Sands at East Heslerton, which were formed by multiple coalescing alluvial fans prograding into the falling water levels of the lake and fed by progressively larger...

  11. Renewables without limits : moving Ontario to advanced renewable tariffs by updating Ontario's groundbreaking standard offer program

    International Nuclear Information System (INIS)

    Gipe, P.

    2007-11-01

    The Ontario Sustainable Energy Association (OSEA) promotes the development of community-owned renewable energy generation. It was emphasized that in order to achieve OSEA's original objectives of developing as much renewable energy as quickly as possible through community participation, changes are needed to Ontario's groundbreaking standard offer contract (SOC) program. This report examined the status of Ontario's SOC program and proposed changes to the program as part of the program's first two-year review. The report provided a summary of the program and discussed each of the program's goals, notably to encourage broad participation; eliminate barriers to distributed renewable generation; provide a stable market for renewable generation; stimulate new investment in renewable generation; provide a rigorous pricing model for setting the tariffs; create a program applicable to all renewable technologies; provide a simple, streamlined, and cost-effective application process; and provide a dispute resolution process. The program goals as developed by the Ontario Power Authority and Ontario Energy Board were discussed with reference to mixed results to date; simplicity; removing barriers; balancing targets with value to ratepayers; and building on the efforts of OSEA. Advanced renewable tariffs (ART) and tariff determination was also discussed along with ART's in Germany, France, Spain and Ontario. Inflation indexing; tariff degression; proposed new tariffs by technology; and other costs and factors affecting profitability were also reviewed. ref., tabs

  12. Childhood leukemia around nuclear facilities

    International Nuclear Information System (INIS)

    1991-01-01

    This Information Bulletin highlights the conclusion made from an Atomic Energy Control Board of Canada (AECB) study on the incidence of childhood leukemia near nuclear facilities. All of the locations with the nuclear facilities are located in Ontario, the nuclear generating stations at Pickering and Bruce; the uranium mines and mills in Elliot Lake; the uranium refining facility in Port Hope; and nuclear research facilities located at Chalk River plus the small nuclear power plant in Rolphton. Two conclusions are drawn from the study: 1) while the rate of childhood leukemias made be higher or lower than the provincial average, there is no statistical evidence that the difference is due to anything but the natural variation in the occurrence of the disease; and 2) the rate of occurrence of childhood leukemia around the Pickering nuclear power station was slightly greater than the Ontario average both before and after the plant opened, but this, too , could be due to the natural variation

  13. Tritium releases, birth defects and infant deaths

    International Nuclear Information System (INIS)

    1991-01-01

    The AECB has published a report 'Tritium releases from the Pickering Nuclear Generating Station and Birth Defects and Infant Mortality in Nearby Communities 1971-1988' (report number INFO-0401). This presents the results of a detailed analysis of deaths and birth defects occurring in infants born to mothers living in the area (25 Km radius) of the Pickering nuclear power plant, over an 18-year period. The analysis looked at the frequency of these defects and deaths in comparison to the general rate for Ontario, and also in relation to airborne and waterborne releases of tritium from the power plant. The overall conclusion was that the rates of infant death and birth defects were generally not higher in the study population than in all of Ontario. There was no prevalent relationship between these deaths and defects and tritium releases measured either at the power plant or by ground monitoring stations t some distance from the facility

  14. Cogeneration markets in Ontario

    International Nuclear Information System (INIS)

    Poredos, S.

    1993-01-01

    Cogeneration offers a key strategy which supports global competitiveness for Ontario businesses, encourages energy efficiency and environmental protection, and offers natural gas utilities and producers stable long-term incremental markets. By supporting cogeneration projects, electric utilities will benefit from increased flexibility. Natural gas is the fuel of choice for cogeneration, which can in most cases be easily integrated into existing operations. In Ontario, electric demand grew along with the gross domestic product until 1990, but has decreased with the recent economic recession. The provincial utility Ontario Hydro is resizing itself to stabilize total rate increases of 30% over the last three years and supporting reduction of its high debt load. Rate increases are supposed to be limited but this may be difficult to achieve without further cost-cutting measures. Cogeneration opportunities exist with many institutional and industrial customers who are trying to remain globally competitive by cutting operating costs. In general, cogeneration can save 20% or more of total annual energy costs. Due to excess capacity, Ontario Hydro is not willing to purchase electric power, thus only electric load displacement projects are valid at this time. This will reduce overall savings due to economies of scale. In southwestern Ontario, Union Gas Ltd. has been successful in developing 40 MW of electric displacement projects, providing a total load of 5 billion ft 3 of natural gas (50% of which is incremental). Over 3,000 MW of technical cogeneration potential is estimated to exist in the Union Gas franchise area

  15. Technical Support of Performance Improvement for Resistance Welding Using Zr-4 Endcap and Endplate

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Soo Sung

    2008-10-15

    The proper welding process for Zircaloy-4 endplate of PHWR and DUPIC fuel bundle assembly is considered important in respect to the soundness of weldment and the improvement of the performance of nuclear fuel bundle during the operation in reactor. The Zircaloy-4 endplate of PHWR and DUPIC fuel bundles are welded by the projection joint type, connecting the endcaps of fuel elements. Therefore, the purpose of this projection joint is to improve the welding quality of torque strength and welding deformation and to apply the commercial productions for the endplate welding of PHWR and DUPIC nuclear fuel bundle assembly.

  16. Colloidal formulations for probiotics delivery and Pickering systems

    DEFF Research Database (Denmark)

    Yücel Falco, Cigdem

    countries. One emerging functional food area is the efficient delivery of health-promoting probiotics. Although much progress has already been made in the development and understanding of novel microencapsulation systems, maintaining viability during gastric passage and being effective at the target site...... is still an issue for probiotics. On the other hand, one of the foremost challenges in the production of physically stable foods during the defined shelf life is the identification of new food-grade ingredients. In this context, the replacement of classical emulsifiers with solid particles is one...... of the advancing food research areas, though the number of food-grade solid particles investigated is still insufficient. Edible probiotic strains can potentially be valorised as particles similar to micron-sized fat particles in Pickering systems such as ice cream due to their low calories and their availability...

  17. Garter spring location of pressure tube for PHWR using eddy current testing methods

    International Nuclear Information System (INIS)

    Lee, Y. S.; Yang, D. J.; Jeong, H. K.

    2001-01-01

    There are garter springs between pressure tube and calandria tube for PHWR. If the space of these garter springs become to be changed, the sagging of tube is caused and the contact between the pressure tube and calandria tube will cause the tube to be failed. AECL has applied the eddy current testing methods using send-receive type probe for this purpose, but this study apply eddy current testing methods using bobbin differential type probe to detection of garter spring location. And we did the computer simulation using VIC-3D code and compared it with experiments results for inspection 1 ∼ 11kHz. The results was that the garter spring signal was successfully detected for every frequency, and 5 kHz was best

  18. IAEA’s Perspectives on Global Nuclear Power – Opportunities and Challenges

    International Nuclear Information System (INIS)

    Park, J.K.

    2014-01-01

    Status of global nuclear power: 437 reactors in operation (374.5 GWe); 2 reactors in long-term shutdown; 149 reactors in permanent shutdown; 70 reactors under construction. [As of Sep. 2014] Latest connections to the grid: - Ningde-2, 1000 MW(e), PWR, China; - Atucha-2, 692 MW(e), PHWR, Argentina; - Fuqing-1, 1000 MW(e), PWR, China). [Website: http://www.iaea.org/pris/]. IAEA projections of nuclear power: • Sep. 2014: 374.5 GWe; • 2030 - low 400.6 GWe: 7.0% increase; - high 699.2 GWe: 86.7% increase; • 2050 - low 412.9 GWe: 10.3% increase; - high 1091.7 GWe: 191.5% increase

  19. Alternative models for restructuring Ontario's electric sector

    International Nuclear Information System (INIS)

    Bright, D.; Salaff, S.

    1996-01-01

    The future of Ontario Hydro and the provincial electrical sector was discussed. Various models proposed for restructuring Ontario's electric sector were described and views of some of the stake holders were presented, among them the views of AMPCO, MEA, the Ontario Chamber of Commerce, IPPSO, Ontario Hydro Management, Energy Probe and the Power Workers' Union. In general, most stake holders were in favour of privatization to some degree except for the Power Workers' Union which was unalterably opposed to privatization, claiming that it would lead to quantum increases in electricity rates. 2 figs

  20. Dual pressurized light water reactor producing 2000 M We

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-10-15

    The dual unit optimizer 2000 M We (Duo2000) is proposed as a new design concept for large nuclear power plant. Duo is being designed to meet economic and safety challenges facing the 21 century green and sustainable energy industry. Duo2000 has two nuclear steam supply systems (NSSS) of the unit nuclear optimizer (Uno) pressurized water reactor (PWR) in a single containment so as to double the capacity of the plant. Uno is anchored to the optimized power reactor 1000 M We (OPR1000) of the Korea Hydro and Nuclear Power Co., Ltd. The concept of Duo can be extended to any number of PWRs or pressurized heavy water reactors (PHWR s), or even boiling water reactor (BWRs). Once proven in water reactors, the technology may even be expanded to gas cooled, liquid metal cooled, and molten salt cooled reactors. In particular, since it is required that the small and medium sized reactors (SMRs) be built as units, the concept of Duo2000 will apply to SMRs as well. With its in-vessel retention as severe accident management strategy, Duo can not only put the single most querulous PWR safety issue to end, but also pave ways to most promising large power capacity dispensing with huge redesigning cost for generation III + nuclear systems. The strengths of Duo2000 include reducing the cost of construction by decreasing the number of containment buildings from two to one, minimizing the cost of NSSS and control systems by sharing between the dual units, and lessening the maintenance cost by uniting NSSS. The technology can further be extended to coupling modular reactors as dual, triple, or quadruple units to increase their economics, thus accelerating the commercialization as well as the customization of SMRs. (Author)

  1. Reverse logistics network for municipal solid waste management: The inclusion of waste pickers as a Brazilian legal requirement

    International Nuclear Information System (INIS)

    Ferri, Giovane Lopes; Diniz Chaves, Gisele de Lorena; Ribeiro, Glaydston Mattos

    2015-01-01

    Highlights: • We propose a reverse logistics network for MSW involving waste pickers. • A generic facility location mathematical model was validated in a Brazilian city. • The results enable to predict the capacity for screening and storage centres (SSC). • We minimise the costs for transporting MSW with screening and storage centres. • The use of SSC can be a potential source of revenue and a better use of MSW. - Abstract: This study proposes a reverse logistics network involved in the management of municipal solid waste (MSW) to solve the challenge of economically managing these wastes considering the recent legal requirements of the Brazilian Waste Management Policy. The feasibility of the allocation of MSW material recovery facilities (MRF) as intermediate points between the generators of these wastes and the options for reuse and disposal was evaluated, as well as the participation of associations and cooperatives of waste pickers. This network was mathematically modelled and validated through a scenario analysis of the municipality of São Mateus, which makes the location model more complete and applicable in practice. The mathematical model allows the determination of the number of facilities required for the reverse logistics network, their location, capacities, and product flows between these facilities. The fixed costs of installation and operation of the proposed MRF were balanced with the reduction of transport costs, allowing the inclusion of waste pickers to the reverse logistics network. The main contribution of this study lies in the proposition of a reverse logistics network for MSW simultaneously involving legal, environmental, economic and social criteria, which is a very complex goal. This study can guide practices in other countries that have realities similar to those in Brazil of accelerated urbanisation without adequate planning for solid waste management, added to the strong presence of waste pickers that, through the

  2. Reverse logistics network for municipal solid waste management: The inclusion of waste pickers as a Brazilian legal requirement

    Energy Technology Data Exchange (ETDEWEB)

    Ferri, Giovane Lopes, E-mail: giovane.ferri@aluno.ufes.br [Department of Engineering and Technology, Federal University of Espírito Santo – UFES, Rodovia BR 101 Norte, Km 60, Bairro Litorâneo, São Mateus, ES, 29.932-540 (Brazil); Diniz Chaves, Gisele de Lorena, E-mail: gisele.chaves@ufes.br [Department of Engineering and Technology, Federal University of Espírito Santo – UFES, Rodovia BR 101 Norte, Km 60, Bairro Litorâneo, São Mateus, ES, 29.932-540 (Brazil); Ribeiro, Glaydston Mattos, E-mail: glaydston@pet.coppe.ufrj.br [Transportation Engineering Programme, Federal University of Rio de Janeiro – UFRJ, Centro de Tecnologia, Bloco H, Sala 106, Cidade Universitária, Rio de Janeiro, 21949-900 (Brazil)

    2015-06-15

    Highlights: • We propose a reverse logistics network for MSW involving waste pickers. • A generic facility location mathematical model was validated in a Brazilian city. • The results enable to predict the capacity for screening and storage centres (SSC). • We minimise the costs for transporting MSW with screening and storage centres. • The use of SSC can be a potential source of revenue and a better use of MSW. - Abstract: This study proposes a reverse logistics network involved in the management of municipal solid waste (MSW) to solve the challenge of economically managing these wastes considering the recent legal requirements of the Brazilian Waste Management Policy. The feasibility of the allocation of MSW material recovery facilities (MRF) as intermediate points between the generators of these wastes and the options for reuse and disposal was evaluated, as well as the participation of associations and cooperatives of waste pickers. This network was mathematically modelled and validated through a scenario analysis of the municipality of São Mateus, which makes the location model more complete and applicable in practice. The mathematical model allows the determination of the number of facilities required for the reverse logistics network, their location, capacities, and product flows between these facilities. The fixed costs of installation and operation of the proposed MRF were balanced with the reduction of transport costs, allowing the inclusion of waste pickers to the reverse logistics network. The main contribution of this study lies in the proposition of a reverse logistics network for MSW simultaneously involving legal, environmental, economic and social criteria, which is a very complex goal. This study can guide practices in other countries that have realities similar to those in Brazil of accelerated urbanisation without adequate planning for solid waste management, added to the strong presence of waste pickers that, through the

  3. Post-irradiation examination of a failed PHWR fuel bundle of KAPS-2

    International Nuclear Information System (INIS)

    Mishra, Prerna; Unnikrishnan, K.; Viswanathan, U.K.; Shriwastaw, R.S.; Singh, J.L.; Ouseph, P.M.; Alur, V.D.; Singh, H.N.; Anantharaman, S.; Sah, D.N.

    2006-08-01

    Detailed post irradiation examination was carried out on a PHWR fuel bundle irradiated at Kakrapar Atomic Power Station unit 2 (KAPS-2). The fuel bundle had failed early in life at a low burnup of 387 MWd/T. Non destructive and destructive examination was carried out to identify the cause of fuel failure. Visual examination and leak testing indicated failure in two fuel pins of the outer ring of the bundle in the form of axial cracks near the end plug location. Ultrasonic testing of the end cap weld indicated presence of lack of fusion type defect in the two fuel pins. No defect was found in other fuel pins of the bundle. Metallographic examination of fuel sections taken from the crack location in the failed fuel pin showed extensive restructuring of fuel. The centre temperature of the fuel had exceeded 1700 degC at this location in the failed fuel pin, whereas fuel centre temperature in the un-failed fuel pin was only about 1300 degC. Severe fuel clad interaction was observed in the failed fuel pin at and near the location of failure but no such interaction was observed in the un-failed fuel pins. Several incipient cracks originating from the inside surface were found in the cladding near failure location in addition to the main through wall crack. The incipient cracks were filled with interaction products and hydride platelets were present at tip of the cracks. It was concluded from the observations that the primary cause of failure was the presence of a part-wall defect in the end cap weld of the fuel pins. These defects opened up during reactor operation leading to steam ingress into the fuel, which caused high fuel centre temperature and severe fuel-cladding interaction resulting in secondary failures. A more stringent inspection and quality control of end plug weld during fabrication using ultrasonic test has been recommended to avoid such failure. (author)

  4. On the optimization of thorium bundle distribution in the initial core loading for a PHWR

    International Nuclear Information System (INIS)

    Mishra, S.; Ray, S.; Kumar, A.N.; Modak, R.S.; Ganesan, S.

    2009-01-01

    If the initial core of Indian 220 MWe PHWR is loaded with all fresh Natural Uranium fuel, only about 70% Full Power can be drawn in the initial operation due to large power peaking. It is possible to load few tens of Th bundles at selected locations to get nearly full power without violating any safety limits. Finding the best possible locations is, however, a fairly complex and massive combinatorial optimization problem. Here, optimum solutions are obtained by a latest evolutionary algorithm called EDA implemented on the EKA built at Computational Research Laboratories (CRL) in Pune. The effect of varying the number of Th bundles on results is discussed. (author)

  5. Preference of multi-walled carbon nanotube (MWCNT) to single-walled carbon nanotube (SWCNT) and activated carbon for preparing silica nanohybrid pickering emulsion for chemical enhanced oil recovery (C-EOR)

    Energy Technology Data Exchange (ETDEWEB)

    AfzaliTabar, M. [Department of Chemistry, Islamic Azad University Branch of Tehran North, Tehran (Iran, Islamic Republic of); Alaei, M., E-mail: alaiem@ripi.ir [Nanotechnology Research Center, Research Institute of Petroleum Industry (RIPI), Tehran (Iran, Islamic Republic of); Ranjineh Khojasteh, R.; Motiee, F. [Department of Chemistry, Islamic Azad University Branch of Tehran North, Tehran (Iran, Islamic Republic of); Rashidi, A.M. [Nanotechnology Research Center, Research Institute of Petroleum Industry (RIPI), Tehran (Iran, Islamic Republic of)

    2017-01-15

    The aim of this research was to determine the best nano hybrid that can be used as a Pickering emulsion Chemical Enhanced Oil Recovery (C-EOR). Therefore, we have prepared different carbon structures nano hybrids with SiO{sub 2} nano particles with different weight percent using sol-gel method. The as-prepared nano materials were characterized with X-Ray Diffraction (XRD), Field Emission Scanning Electron Microscopy (FE-SEM) and Thermal Gravimetric Analysis (TGA). Pickering emulsions of these nanohybrids were prepared at pH=7 in ambient temperature and with distilled water. Stability of the mentioned Pickering emulsions was controlled for one month. Emulsion phase morphology was investigated using optical microscopic imaging. Evaluation results demonstrated that the best sample is the 70% MWCNT/SiO{sub 2} nanohybrid. Stability of the selected nanohybrid (70% MWCNT/SiO{sub 2} nanohybrid) was investigated by alteration of salinity, pH and temperature. Results showed that the mentioned Pickering emulsion has very good stability at 0.1%, 1% salinity, moderate and high temperature (25 °C and 90 °C) and neutral and alkaline pH (7, 10) that is suitable for the oil reservoirs conditions. The effect of the related nano fluid on the wettability of carbonate rock was investigated by measuring the contact angle and interfacial tension. Results show that the nanofluid could significantly change the wettability of the carbonate rock from oil wet to water wet and can decrease the interfacial tension. Therefore, the 70% MWCNT/SiO{sub 2} nanohybrid Pickering emulsion can be used for Chemical Enhanced Oil Recovery (C-EOR).

  6. Preference of multi-walled carbon nanotube (MWCNT) to single-walled carbon nanotube (SWCNT) and activated carbon for preparing silica nanohybrid pickering emulsion for chemical enhanced oil recovery (C-EOR)

    International Nuclear Information System (INIS)

    AfzaliTabar, M.; Alaei, M.; Ranjineh Khojasteh, R.; Motiee, F.; Rashidi, A.M.

    2017-01-01

    The aim of this research was to determine the best nano hybrid that can be used as a Pickering emulsion Chemical Enhanced Oil Recovery (C-EOR). Therefore, we have prepared different carbon structures nano hybrids with SiO 2 nano particles with different weight percent using sol-gel method. The as-prepared nano materials were characterized with X-Ray Diffraction (XRD), Field Emission Scanning Electron Microscopy (FE-SEM) and Thermal Gravimetric Analysis (TGA). Pickering emulsions of these nanohybrids were prepared at pH=7 in ambient temperature and with distilled water. Stability of the mentioned Pickering emulsions was controlled for one month. Emulsion phase morphology was investigated using optical microscopic imaging. Evaluation results demonstrated that the best sample is the 70% MWCNT/SiO 2 nanohybrid. Stability of the selected nanohybrid (70% MWCNT/SiO 2 nanohybrid) was investigated by alteration of salinity, pH and temperature. Results showed that the mentioned Pickering emulsion has very good stability at 0.1%, 1% salinity, moderate and high temperature (25 °C and 90 °C) and neutral and alkaline pH (7, 10) that is suitable for the oil reservoirs conditions. The effect of the related nano fluid on the wettability of carbonate rock was investigated by measuring the contact angle and interfacial tension. Results show that the nanofluid could significantly change the wettability of the carbonate rock from oil wet to water wet and can decrease the interfacial tension. Therefore, the 70% MWCNT/SiO 2 nanohybrid Pickering emulsion can be used for Chemical Enhanced Oil Recovery (C-EOR).

  7. Pickering emulsions stabilized by biodegradable block copolymer micelles for controlled topical drug delivery.

    Science.gov (United States)

    Laredj-Bourezg, Faiza; Bolzinger, Marie-Alexandrine; Pelletier, Jocelyne; Chevalier, Yves

    2017-10-05

    Surfactant-free biocompatible and biodegradable Pickering emulsions were investigated as vehicles for skin delivery of hydrophobic drugs. O/w emulsions of medium-chain triglyceride (MCT) oil droplets loaded with all-trans retinol as a model hydrophobic drug were stabilized by block copolymer nanoparticles: either poly(lactide)-block-poly(ethylene glycol) (PLA-b-PEG) or poly(caprolactone)-block-poly(ethylene glycol) (PCL-b-PEG). Those innovative emulsions were prepared using two different processes allowing drug loading either inside oil droplets or inside both oil droplets and non-adsorbed block copolymer nanoparticles. Skin absorption of retinol was investigated in vitro on pig skin biopsies using the Franz cell method. Supplementary experiments by confocal fluorescence microscopy allowed the visualization of skin absorption of the Nile Red dye on histological sections. Retinol and Nile Red absorption experiments showed the large accumulation of hydrophobic drugs in the stratum corneum for the Pickering emulsions compared to the surfactant-based emulsion and an oil solution. Loading drug inside both oil droplets and block copolymer nanoparticles enhanced again skin absorption of drugs, which was ascribed to the supplementary contribution of free block copolymer nanoparticles loaded with drug. Such effect allowed tuning drug delivery to skin over a wide range by means of a suitable selection of either the formulation or the drug loading process. Copyright © 2017 Elsevier B.V. All rights reserved.

  8. Management of design support for nuclear plant modifications

    International Nuclear Information System (INIS)

    Doyle, F.W.

    1991-01-01

    The paper will present an overview of the Ontario Hydro organization and processes for providing design support to the operating nuclear power plants. Examples of design support for Pickering GS will be highlighted. The process is described from identification of projects through the design, procurement, construction, commissioning and in-service phases. The practices for managing engineering deliverables are discussed in the context of how these integrate into the overall change control process. The interaction of Engineering with Operations, Construction, Supply and the regulatory bodies is discussed both for major retro-fit programs and for ongoing design support to the nuclear power plants. Recent experiences during the 1990 Pickering Station Outage and during the Unit 3 fuel channel replacement program are highlighted and an integrated 5 year plan for upgrading the safety related systems for the Pickering Nuclear Power Plant is presented. (author)

  9. Selective removal of erythromycin by magnetic imprinted polymers synthesized from chitosan-stabilized Pickering emulsion.

    Science.gov (United States)

    Ou, Hongxiang; Chen, Qunhui; Pan, Jianming; Zhang, Yunlei; Huang, Yong; Qi, Xueyong

    2015-05-30

    Magnetic imprinted polymers (MIPs) were synthesized by Pickering emulsion polymerization and used to adsorb erythromycin (ERY) from aqueous solution. The oil-in-water Pickering emulsion was stabilized by chitosan nanoparticles with hydrophobic Fe3O4 nanoparticles as magnetic carrier. The imprinting system was fabricated by radical polymerization with functional and crosslinked monomer in the oil phase. Batches of static and dynamic adsorption experiments were conducted to analyze the adsorption performance on ERY. Isotherm data of MIPs well fitted the Freundlich model (from 15 °C to 35 °C), which indicated heterogeneous adsorption for ERY. The ERY adsorption capacity of MIPs was about 52.32 μmol/g at 15 °C. The adsorption kinetics was well described by the pseudo-first-order model, which suggested that physical interactions were primarily responsible for ERY adsorption. The Thomas model used in the fixed-bed adsorption design provided a better fit to the experimental data. Meanwhile, ERY exhibited higher affinity during adsorption on the MIPs compared with the adsorption capacity of azithromycin and chloramphenicol. The MIPs also exhibited excellent regeneration capacity with only about 5.04% adsorption efficiency loss in at least three repeated adsorption-desorption cycles. Copyright © 2015 Elsevier B.V. All rights reserved.

  10. Benthic prey fish assessment, Lake Ontario 2013

    Science.gov (United States)

    Weidel, Brian C.; Walsh, Maureen; Connerton, Michael J.

    2014-01-01

    abundance and weight indices increased slightly as compared to 2012. The number index value of 16.6 was 30% of the maximum number observed in 2008 when the number index was 95.2. Round Goby density estimates from the 2013 fall benthic prey fish survey were 33 times greater than fall Slimy Sculpin density, indicating Round Goby are now the dominant Lake Ontario benthic prey fish.

  11. A data base for PHW reactor operating on a once-through, low enriched uranium-thorium cycle

    International Nuclear Information System (INIS)

    Lungu, S.

    1984-04-01

    The study of a detailed data base for a new once-through uranium-thorium cycle using low enriched uranium (4 and 5,5% wt. U-235) and distinct UO 2 and ThO 2 fuel channels has been performed. With reference to a standard 638 MWe CANDU-type PHWR with 380 channels, evaluation of economics, fuel behaviour and safety has been performed. The Feinberg-Galanin method (code FEINGAL) has been used for calculation of axial flux distribution. All parameters have been provided by LATREP code following up the irradiation history. Economical assessment has shown that this fuel cycle is competitive with the natural uranium fuel cycle for 1979-based values of the parameters. Fuel behaviour and safety features modelling has shown that core behaviour of the uranium-thorium reactor under abnormal and accident conditions would be at least as good as that of the standard natural uranium reactor

  12. Beware: The empire striking back: An update of regulatory changes in Ontario`s gas and electricity business as at February 1998

    Energy Technology Data Exchange (ETDEWEB)

    Rosenberg, K. [Gowling, Strathy and Henderson, Toronto, ON (Canada)

    1998-09-01

    A review of what is happening with regard to deregulation of the gas and electricity industry in Ontario was presented. Recently, a series of government actions in Ontario have recommended fundamental changes in the gas and electric power sector. Prior to the October 31, 1985 agreement, no competitive market existed within local distribution franchises in Ontario or elsewhere in Canada. The Agreement created gas on gas competition and enabled consumers to purchase natural gas from producers at negotiated prices. The Ontario government`s proposed legislation and implementation schedule forecasts even more fundamental changes for the province`s electric power industry. Essentially, the legislation proposes to break up Ontario Hydro into several different entities and transfer regulatory authority to the Ontario Energy Board. The pending legislation also envisages the structural separation of local distribution companies into natural monopolies which will compete in the marketplace. The possibility of privatizing part or all of Ontario`s nuclear assets is also part of the ongoing debate. It was the author`s view that unless there is immediate and complete structural separation of all monopoly services within the gas and electric utilities, the market will not be truly competitive. Instead, regulated monopoly pricing would be replaced by unregulated oligopoly pricing. 1 tab.

  13. Ontario Hydro CANDU operating experience

    International Nuclear Information System (INIS)

    Bartholomew, R.W.; Woodhead, L.W.; Horton, E.P.; Nichols, M.J.; Daly, I.N.

    1987-01-01

    The CANDU Pressurized Heavy Water (CANDU-PHW) type of nuclear-electric generating station has been developed jointly by Atomic Energy of Canada Limited and Ontario Hydro. This report highlights Ontario Hydro's operating experience using the CANDU-PHW system, with a focus on worker and public safety, operating performance and costs, and reliability of system components

  14. Ontario Hydro annual report 1975

    International Nuclear Information System (INIS)

    A financial report and statistics on Ontario energy demand are presented. Efforts to secure a reliable supply of coal and uranium are described. Ontario Hydro's expansion is now controlled by capital availability and not power demand, and this has affected 11 construction projects, including heavy water plants and nuclear generating stations. (E.C.B.)

  15. Summary of Ontario Hydro's 1990-91 zebra mussel research program

    International Nuclear Information System (INIS)

    Claudi, R.; Wiancko, P.M.

    1992-01-01

    Ontario Hydro is the principal supplier of electricity to the Province of Ontario. It serves 3.6 million customers, with an inservice capacity of 28,200 MW. Ontario Hydro has seven fossil, five nuclear, and four hydraulic stations in the Great Lakes Basin and surrounding watershed. In addition, there are another 60 inland hydraulic stations and numerous dams. As the largest single user of raw water from the Great Lakes Basin, Ontario Hydro recognized the need to control zebra mussels early in 1989. At that time, very little was known in North America about the zebra mussel life cycle and potential impact. European utilities were consulted, but as we now know, zebra mussels are not perceived to be a problem in Europe at this time. To satisfy the immediate need for control, chlorination was identified as the most effective interim measure to prevent the fouling of systems which draw water from the aquatic environment. Due to the current regulatory environment, this solution is considered short term and Ontario Hydro was compelled to initiate a comprehensive research effort aimed at providing alternative methods of control. Most of the research effort during 1990, was methods of control. Most of the research effort during 1990, was directed towards this goal. Many alternative control measures, both chemical and nonchemical were considered. Also considered were the potential effects of the control measures and zebra mussels on station operations. A multidisciplinary team involving aquatic biologists, chemists, corrosion specialists, and civil and mechanical engineers from the various departments of Ontario Hydro was asked to address the problem. Some of the research also involved collaborative studies with universities, US utilities, American Water Works Association, and Canadian industries. Following is a summary of the research effort in 1990, and a preview of the research underway in 1991

  16. Control chart analysis of data regarding 0.2% yield strength (YS) and percent total circumferential elongation (%TCE) for zircaloy clad tubes for PHWR and BWR fuels

    International Nuclear Information System (INIS)

    Yadav, M.B.; Singh, Hari; Vaidyanathan, S.; Sood, D.D.; Raghavan, S.V.; Bandyopadhyay, A.K.; Kulkarni, P.G.

    1992-01-01

    Zircaloy cladding tubes for PHWR and BWR fuels are manufactured and tested at Nuclear Fuel Complex (NFC), Hyderabad. Atomic Fuels Division is carrying out the quality assurance of the fuels on behalf of Nuclear Power Corporation (NPC). In this paper an attempt has been made to assess whether the quality of the clad tubes has met the requirements specified for the two mechanical properties of the tubes namely 0.2% yield strength and percent total circumferential elongation using control chart technique. For this purpose data for about 100 lots in each case were used. Process means and process standard deviations for these properties and the control limits for the corresponding control charts were estimated. The main findings are: (i) In case of PHWR tubes the production quality level with respect to 0.2% YS is higher, while that in case of %TCE is lower causing rejection of lots. On the other hand in the case of BWR tubes the production quality levels with respect to both the properties are higher than the required one. (ii) With respect to 0.2% YS, in case of BWR tubes a change in the pattern of distribution is detected beyond the lot serial no.47. However in case of PHWR tubes, though the data falls into two groups, no such pattern is seen. A modification in the acceptance/rejection criterion of the lot has been suggested. It is also pointed out that to have a correct picture of the total variation it is necessary to study the within tube variation. (author). 4 figs, 2 tabs

  17. Ontario hydro radioactive material transportation field guide

    International Nuclear Information System (INIS)

    Howe, W.

    1987-01-01

    The recent introduction of both the AECB Transport Packaging of Radioactive Material Regulations and Transport Canada's Transportation of Dangerous Goods Regulations have significantly altered the requirements for transporting radioactive material in Canada. Extensive additional training as well as certification of several hundred Ontario Hydro employees has been necessary to ensure compliance with the additional and revised regulatory requirements. To assist in the training of personnel, an 'active' corporate Ontario Hydro Field Guide for Radioactive Material Transport document has been developed and published. The contents of this Field Guide identify current Ontario Hydro equipment and procedures as well as the updated relevant regulatory requirements within Canada. In addition, to satisfying Ontario Hydro requirements for this type of information over two thousand of these Field Guides have been provided to key emergency response personnel throughout the province of Ontario to assist in their transportation accident response training

  18. Retailers test Ontario market

    Energy Technology Data Exchange (ETDEWEB)

    Kishewitsch, S.

    2000-04-01

    In anticipation of the full opening of the Ontario electricity market in November 2000, some of the newly-licensed electricity retailers are reported to be ready to begin testing the market early, hoping that all the uncertainties that still exist about pricing will be worked out in time. Among those jumping in now is Direct Energy Marketing, a retailer which claims 800,000 households in Ontario as electricity supply customers, as well as a wholesale gas marketing business. Direct Energy began retail electrical marketing on April 3, 2000, starting cautiously with small commercial operations as the initial target. Greengrid Electric, another of the new marketers, planned to begin marketing in mid-April, offering 100 per cent renewable-sourced electricity. Provident Energy Management, one of the new marketers whose licence is still pending, hopes to begin direct marketing as soon as its licence is confirmed. Another marketer ready to go as soon its license is issued is the former Sault Ste. Marie Hydro, now reorganized as PUC Energies Inc. PUC has the advantage of having a firm contract with a NUG (non-utility generator), Great Lakes Power, signed while PUC was still a municipal electric utility. As far as the other potential marketers are concerned, caution overrides opportunity for the present. Principal concerns are uncertainty over the retail settlement code, the electronic business data transfer system, transmission and distribution tariffs, whether existing non-utility generator contracts will allow for supply to another party, and over how quickly Ontario Power Generation Inc's (successor to Ontario Hydro) market power will be ratcheted down. Many of the potential marketers feel that despite the Ontario government's desire to see more competition, the power mitigation agreement, as it now reads, leaves little room for the small retailer to compete.

  19. Retailers test Ontario market

    International Nuclear Information System (INIS)

    Kishewitsch, S.

    2000-01-01

    In anticipation of the full opening of the Ontario electricity market in November 2000, some of the newly-licensed electricity retailers are reported to be ready to begin testing the market early, hoping that all the uncertainties that still exist about pricing will be worked out in time. Among those jumping in now is Direct Energy Marketing, a retailer which claims 800,000 households in Ontario as electricity supply customers, as well as a wholesale gas marketing business. Direct Energy began retail electrical marketing on April 3, 2000, starting cautiously with small commercial operations as the initial target. Greengrid Electric, another of the new marketers, planned to begin marketing in mid-April, offering 100 per cent renewable-sourced electricity. Provident Energy Management, one of the new marketers whose licence is still pending, hopes to begin direct marketing as soon as its licence is confirmed. Another marketer ready to go as soon its license is issued is the former Sault Ste. Marie Hydro, now reorganized as PUC Energies Inc. PUC has the advantage of having a firm contract with a NUG (non-utility generator), Great Lakes Power, signed while PUC was still a municipal electric utility. As far as the other potential marketers are concerned, caution overrides opportunity for the present. Principal concerns are uncertainty over the retail settlement code, the electronic business data transfer system, transmission and distribution tariffs, whether existing non-utility generator contracts will allow for supply to another party, and over how quickly Ontario Power Generation Inc's (successor to Ontario Hydro) market power will be ratcheted down. Many of the potential marketers feel that despite the Ontario government's desire to see more competition, the power mitigation agreement, as it now reads, leaves little room for the small retailer to compete

  20. Ontario energy market review and outlook

    International Nuclear Information System (INIS)

    Brett, J.T.

    1997-01-01

    The current status of the natural gas industry and the electric power industry in Ontario, in terms of deregulation, was described. Natural gas utilities will exit the regulated gas market over the next few years and transfer their existing residential and small commercial gas contracts to their unregulated affiliates. Nevertheless, a regulated gas supply option will remain until the regulator is assured that consumer protection issues have been properly addressed, and there is a truly competitive market. Ontario Hydro is a vertically integrated virtual monopoly. It lags behind B.C., Alberta, Quebec and Nova Scotia in terms of deregulation and restructuring, although the MacDonald Commission's recent report recommended sweeping changes to Ontario Hydro's monopoly over the electric power industry. A final response from the Ontario government is still pending. The convergence of the electric power and natural gas industries was also discussed