WorldWideScience

Sample records for on-site pafc power

  1. 1000kW on-site PAFC power plant development and demonstration

    Energy Technology Data Exchange (ETDEWEB)

    Satomi, Tomohide; Koike, Shunichi [Phosphoric Acid Fuel Cell Technology Research Association (PAFC-TRA), Osaka (Japan); Ishikawa, Ryou [New Energy and Industrial Technology Development Organization (NEDO), Tokyo (Japan)

    1996-12-31

    Phosphoric Acid Fuel Cell Technology Research Association (PAFC-TRA) and New Energy and Industrial Technology Development Organization (NEDO) have been conducting a joint project on development of a 5000kW urban energy center type PAFC power plant (pressurized) and a 1000kW on-site PAFC power plant (non-pressurized). The objective of the technical development of 1000kW on-site PAFC power plant is to realize a medium size power plant with an overall efficiency of over 70% and an electrical efficiency of over 36%, that could be installed in a large building as a cogeneration system. The components and system integration development work and the plant design were performed in 1991 and 1992. Manufacturing of the plant and installation at the test site were completed in 1994. PAC test was carried out in 1994, and generation test was started in January 1995. Demonstration test is scheduled for 1995 and 1996.

  2. Development of on-site PAFC stacks

    Energy Technology Data Exchange (ETDEWEB)

    Hotta, K.; Matsumoto, Y. [Kansai Electric Power Co., Amagasaki (Japan); Horiuchi, H.; Ohtani, T. [Mitsubishi Electric Corp., Kobe (Japan)

    1996-12-31

    PAFC (Phosphoric Acid Fuel Cell) has been researched for commercial use and demonstration plants have been installed in various sites. However, PAFC don`t have a enough stability yet, so more research and development must be required in the future. Especially, cell stack needs a proper state of three phases (liquid, gas and solid) interface. It is very difficult technology to keep this condition for a long time. In the small size cell with the electrode area of 100 cm{sup 2}, gas flow and temperature distributions show uniformity. But in the large size cell with the electrode area of 4000 cm{sup 2}, the temperature distributions show non-uniformity. These distributions would cause to be shorten the cell life. Because these distributions make hot-spot and gas poverty in limited parts. So we inserted thermocouples in short-stack for measuring three-dimensional temperature distributions and observed effects of current density and gas utilization on temperature.

  3. Evaluation of the performance degradation at PAFC effect of catalyst degradation on electrode performance

    Energy Technology Data Exchange (ETDEWEB)

    Nishizaki, K.; Uchida, H.; Watanabe, M. [Yamanashi Univ., Kofu (Japan)] [and others

    1996-12-31

    Aiming commercialization of Phosphoric Acid Fuel Cell (PAFC) power plant, many researches and developments have been contributed. Over 20000 hours operations have been demonstrated by many PAFC power plants. But there is no effective method for the estimation of lifetime of electrochemical cells without a practical long-term operation. Conducted by New Energy and Industrial Technology Development Organization (NEDO), cooperative research projects aiming development of PAFC lifetime estimation method have started since 1995 FY in Japan. As part of this project, this work has been performed to clarify basic phenomena of the performance degradation at PAFCs jointly by Yamanashi University, Phosphoric Acid Fuel Cell Technology Research Association (PAFC-TRA) and PAFC manufacturers (Toshiba Co., Mitsubishi Electric Co, Fuji Electric Co.). Among several main causes of the cell performance degradation, effects of catalyst degradation (reduction in metal surface area, dealloying, changes in catalyst support) on PAFC cathode performances are discussed in this work.

  4. Development of a 200kW multi-fuel type PAFC power plant

    Energy Technology Data Exchange (ETDEWEB)

    Take, Tetsuo; Kuwata, Yutaka; Adachi, Masahito; Ogata, Tsutomu [NTT Integrated Information & Energy System Labs., Tokyo (Japan)

    1996-12-31

    Nippon Telegraph and Telephone Corporation (NFT) has been developing a 200 kW multi-fuel type PAFC power plant which can generate AC 200 kW of constant power by switching fuel from pipeline town gas to liquefied propane gas (LPG) and vice versa. This paper describes the outline of the demonstration test plant and test results of its fundamental characteristics.

  5. Influence of impurity gases and operating conditions on PAFC performance

    Energy Technology Data Exchange (ETDEWEB)

    Hirai, K.; Iwasa, N.; Suzuki, M.; Okada, O. [Osaka Gas Co., Ltd. (Japan)] [and others

    1996-12-31

    On-site Phosphoric Acid Fuel Cell (PAFC) Cogeneration system is installed at various test sites, such as at underground parking lot, within chemical plant premises and near urban streets. Since in the current PAFC system, cathode air is supplied to the cell with no particular pretreatment, impurity gases in the air might influence on cell performance. We have investigated the influence of various impurity gases in the cathode gas, on sub-scale single cells, and have found that NO{sub 2}, SO{sub 2} and toluene affect negatively on cell performance. The results of these experiments and the conceivable mechanism of these effects on cell degradation are reported. We have also investigated the influence of other operating parameters, such as temperature, current density, fuel utilization on cell performance. From these experiments, we have found that operating temperature is a significant factor, which mainly determines cell voltage decline rate. The results of sub-scale single cell tests and a short-stack verification test are also reported.

  6. Evaluation of the performance degradation at PAFC effect of operating conditions on acid loss

    Energy Technology Data Exchange (ETDEWEB)

    Miyoshi, Hideaki; Uchida, Hiroyuki; Watanabe, Masahiro [Yamanashi Univ., Kofu (Japan)] [and others

    1996-12-31

    As a complimentary research project to the demonstration project of 5MW and 1 MW PAFC plants, the mechanism and rate of deterioration of the cells and stacks have been studied from 1995 FY conducted by NEDO, with the objective of establishing an estimation method for the service life-time of the cell stacks. As part of this project, this work has been performed to clarify basic phenomena of the performance degradation at PAFCs jointly by Yamanashi University, PAFC-TRA and PAFC manufacturers. The acid loss into exhaust gases is one of life limiting factors in PAFCs. To design the cells of long-life, it is important to estimate the phosphoric acid loss and to contrive ideas eliminating it. With the objective of obtaining basic data for simulating the acid loss in the large size cells, the effect of the operating conditions on the acid loss into exhaust gases has been studied experimentally by using a single cell with an active electrode area of 100 cm{sup 2}.

  7. Evaluation of the performance degradation at PAFC effect of electrolyte fill-level on electrode performance

    Energy Technology Data Exchange (ETDEWEB)

    Kitai, Takashi; Uchida, Hiroyuki; Watanabe, Masahiro [Yamanashi Univ., Kofu (Japan)] [and others

    1996-12-31

    As a complimentary research project to the demonstration project of 5MW and 1MW PAFC plants, the mechanism and rate of deterioration of the cells and stacks have been studied from 1995 FY, with the objective of establishing an estimation method for the service life-time of the cell stacks. This work has been performed in the Basic Research Project, as part of that project on PAFC`s, selecting four subjects (Electrocatalysts degradation, Electrolyte fill-level, Cell material corrosion, Electrolyte loss) as the essential factors relating to the life-time. In this report, we will exhibit the effect of the electrolyte fill-level on the electrode performances.

  8. Development of the electric utility dispersed use PAFC stack

    Energy Technology Data Exchange (ETDEWEB)

    Horiuchi, Hiroshi; Kotani, Ikuo [Mitsubishi Electric Co., Kobe (Japan); Morotomi, Isamu [Kansai Electric Power Co., Hyogo (Japan)] [and others

    1996-12-31

    Kansai Electric Power Co. and Mitsubishi Electric Co. have been developing the electric utility dispersed use PAFC stack operated under the ambient pressure. The new cell design have been developed, so that the large scale cell (1 m{sup 2} size) was adopted for the stack. To confirm the performance and the stability of the 1 m{sup 2} scale cell design, the short stack study had been performed.

  9. Estimation of current density distribution of PAFC by analysis of cell exhaust gas

    Energy Technology Data Exchange (ETDEWEB)

    Kato, S.; Seya, A. [Fuji Electric Co., Ltd., Ichihara-shi (Japan); Asano, A. [Fuji Electric Corporate, Ltd., Yokosuka-shi (Japan)

    1996-12-31

    To estimate distributions of Current densities, voltages, gas concentrations, etc., in phosphoric acid fuel cell (PAFC) stacks, is very important for getting fuel cells with higher quality. In this work, we leave developed a numerical simulation tool to map out the distribution in a PAFC stack. And especially to Study Current density distribution in the reaction area of the cell, we analyzed gas composition in several positions inside a gas outlet manifold of the PAFC stack. Comparing these measured data with calculated data, the current density distribution in a cell plane calculated by the simulation, was certified.

  10. Evaluation of the performance degradation at PAFC investigation of dealloying process of electrocatalysts with in-situ XRD

    Energy Technology Data Exchange (ETDEWEB)

    Nakajima, Noriyuki; Uchida, Hiroyuki; Watanabe, Masahiro [Yamanashi Univ., Kofu (Japan)] [and others

    1996-12-31

    As a complementary research project to the demonstration project of 5MW and 1 MW PAFC plants, the mechanism and rate of deterioration of the cells and stacks have been studied from 1995 FY, with the objective of establishing an estimation method for the service life-time of the cell stacks. This work has been performed in the Basic Research Project, as part of that project on PAFC`s, selecting four subjects (Electrocatalysts degradation, Electrolyte fill-level, Cell material corrosion, Electrolyte loss) as the essential factors relating to the life-time. In this study, the effect of temperature and potential on the dealloying process of electrocatalysts was examined in H{sub 3}PO{sub 4} electrolyte with X-ray diffraction measurement.

  11. Long-term commitment of Japanese gas utilities to PAFCs and SOFCs

    Science.gov (United States)

    Matsumoto, Kiyokazu; Kasahara, Komei

    Tokyo Gas and Osaka Gas have been committed to addressing the energy- and environment-related issues of Japan through promotion of natural gas, an energy friendly to the environment. Being aware of the diversifying market needs (e.g. efficient energy utilization, rising demand for electricity, etc.), active efforts have been made in marketing gas-fired air-conditioning and co-generation systems. In this process, a high priority has also been placed on fuel cells, particularly for realizing their market introduction. Since their participation in the TARGET Program in USA in 1972, the two companies have been involved with the field testing and operation of phosphoric acid fuel cells (PAFCs), whose total capacity has amounted to 12.4 MW. The two companies have played a vital role in promoting and accelerating fuel cell development through the following means: (1) giving incentives to manufacturers through purchase of units and testing, (2) giving feedback on required specifications and technical problems in operation, and (3) verifying and realizing long-term operation utilizing their maintenance techniques. It has been expected that the primary goal of the cumulative operation time of 40 000 h shall be achieved in the near future. Work has also been in progress to develop SOFC. In the joint R&D of a 25-kW solid oxide fuel cell (SOFC) with Westinghouse, the record operation time of 13 000 h has been achieved. Though still twice as much as the average price of competing equipment, the commercialization of PAFCs is close at hand. By utilizing government spending and subsidies for field testing, work will be continued to verify reliability and durability of PAFCs installed at users' sites. These activities have been expected to contribute to realizing economically viable systems and enhance market introduction. The superlative advantages of fuel cells, particularly their environment-friendly qualities, should be best taken advantage of at an appropriate time. In

  12. Maximum power output and load matching of a phosphoric acid fuel cell-thermoelectric generator hybrid system

    Science.gov (United States)

    Chen, Xiaohang; Wang, Yuan; Cai, Ling; Zhou, Yinghui

    2015-10-01

    Based on the current models of phosphoric acid fuel cells (PAFCs) and thermoelectric generators (TGs), a new hybrid system is proposed, in which the effects of multi-irreversibilities resulting from the activation, concentration, and ohmic overpotentials in the PAFC, Joule heat and heat leak in the TG, finite-rate heat transfer between the TG and the heat reservoirs, and heat leak from the PAFC to the environment are taken into account. Expressions for the power output and efficiency of the PAFC, TG, and hybrid system are analytically derived and directly used to discuss the performance characteristics of the hybrid system. The optimal relationship between the electric currents in the PAFC and TG is obtained. The maximum power output is numerically calculated. It is found that the maximum power output density of the hybrid system will increase about 150 Wm-2, compared with that of a single PAFC. The problem how to optimally match the load resistances of two subsystems is discussed. Some significant results for practical hybrid systems are obtained.

  13. Stationary power fuel cell commercialization status worldwide

    Energy Technology Data Exchange (ETDEWEB)

    Williams, M.C. [Dept. of Energy, Morgantown, WV (United States)

    1996-12-31

    Fuel cell technologies for stationary power are set to play a role in power generation applications worldwide. The worldwide fuel cell vision is to provide powerplants for the emerging distributed generation and on-site markets. Progress towards commercialization has occurred in all fuel cell development areas. Around 100 ONSI phosphoric acid fuel cell (PAFC) units have been sold, with significant foreign sales in Europe and Japan. Fuji has apparently overcome its PAFC decay problems. Industry-driven molten carbonate fuel cell (MCFC) programs in Japan and the U.S. are conducting megawatt (MW)-class demonstrations, which are bringing the MCFC to the verge of commercialization. Westinghouse Electric, the acknowledged world leader in tubular solid oxide fuel cell (SOFC) technology, continues to set performance records and has completed construction of a 4-MW/year manufacturing facility in the U.S. Fuel cells have also taken a major step forward with the conceptual development of ultra-high efficiency fuel cell/gas turbine plants. Many SOFC developers in Japan, Europe, and North America continue to make significant advances.

  14. Integration of a PAFC-Cogeneration Plant into an existing District-Heating-System

    International Nuclear Information System (INIS)

    Wagner, Ulrich; Geiger, Bernd; Grohmann, Juergen

    1999-01-01

    The Studiengesellschaft Brennstoffzellen e. V. assigned in the middle of 1995 the Institutions ''Lehrstuhl fir Energiewirtschaft mid Kraftwerkstechnik (IfE)'' to design a concept to integrate an ONSI-PAFC Model C in an existing district heating system. The fuel cell generates about 200 kW electrical and 215 kW thermal power consuming 500 kW natural gas. In the case of complete use of thermal power the fuel cell surpasses the efficiency of conventional systems by about 30 %. The possibilities to install the fuel cell were investigated at three locations, two housing areas, one with 36.000 m2 the other with 60.000 m2 heated area, and one indoor pool. The heating systems are representative of the Federal Republic of Germany. It turned out that the integration of the fuel cell into the existing heating system might be difficult at each location, either the annual consumption of thermal energy was too low or the heating system was operating at a temperature level reducing the usable thermal power of the fuel cell. After further studies the larger housing area was selected, with the intention of using the thermal power of the fuel cell during the whole year and to get high thermal load factors. Some difficulties are caused by the temperature level of the heating system, which is 70/55 o C. (author)

  15. Phosphoric acid fuel cell platinum use study

    Science.gov (United States)

    Lundblad, H. L.

    1983-05-01

    The U.S. Department of Energy is promoting the private development of phosphoric acid fuel cell (PAFC) power plants for terrestrial applications. Current PAFC technology utilizes platinum as catalysts in the power electrodes. The possible repercussions that the platinum demand of PAFC power plant commercialization will have on the worldwide supply and price of platinum from the outset of commercialization to the year 2000 are investigated. The platinum demand of PAFC commercialization is estimated by developing forecasts of platinum use per unit of generating capacity and penetration of PAFC power plants into the electric generation market. The ability of the platinum supply market to meet future demands is gauged by assessing the size of platinum reserves and the capability of platinum producers to extract, refine and market sufficient quantities of these reserves. The size and timing of platinum price shifts induced by the added demand of PAFC commercialization are investigated by several analytical methods. Estimates of these price shifts are then used to calculate the subsequent effects on PAFC power plant capital costs.

  16. Development of the on-site power supply in German nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Simon, M. [Gesellschaft fuer Reaktorsicherheit - GRS mbH, Schwertnergasse 1, D-5000 Koeln 1, Cologne (Germany)

    1986-02-15

    The design of the on-site power supply is different in German Nuclear Power Plants, depending on age and size of the plant. The cause for this is the evolution of the safety requirements. The general development of the design of safety Systems, which resulted in a strict separation of redundant trains is also reflected in the design of the emergency power system and even the complete on-site power supply System. This will be demonstrated by different examples. The advantages of this design with respect to the availability of on-site power will be explained and verified by means of operating experience. (author)

  17. On-site tests on the nuclear power plants

    International Nuclear Information System (INIS)

    Morilhat, P.; Favennec, J.M.; Neau, P.; Preudhomme, E.

    1996-01-01

    On-site tests and experiments are performed by EDF Research and Development Division on the nuclear power plants to assess the behaviour of major components submitted to thermal and vibratory solicitations. On-going studies deal with the qualification of new nuclear power plant standard and with the feedback of plants under operation. The tests, particularly the investigation tests, correspond to large investments and entail an important data volume which must ensure the continuity over a long period of the order of magnitude of the in-service plant life (around 40 years). This paper addresses the on-site experimental activities, describes the means to be used, and gives an example: the qualification of SG of new 1450 MW nuclear power plants. (author)

  18. Experiences with on-site power sources at KCB

    Energy Technology Data Exchange (ETDEWEB)

    Heijnen, B. M.A. [Borssele Nuclear Power Station, N.V. P.Z.E.M., Postbus 48, 4330 AA Middleburg (Netherlands)

    1986-02-15

    The design of the nuclear power station is of the late sixties. The experiences with the on-site power sources, signal processing and some of the resulting modifications of the design of the power plant are mentioned. In order to let the design satisfy as much as possible present ideas about safety, it was decided to realize a total new and Independent decay heat removal System. With this system a second independent on-site power System is at disposal in case of accident situations. (author)

  19. Evaluation of the electrode performance for PAFC by using acid absorption, acceleration and ac-impedance measurement

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Chang-Soo; Song, Rak-Hyun; Choi, Byung-Woo [Korea Institute of Energy Research, Taejon (Korea, Republic of)] [and others

    1996-12-31

    In PAFC, the degradation on cathode electrode caused by carbon corrosion, platinum dissolution and growth is especially severe. An acceleration test is a good technique for evaluating the degradation of electrode performance, because it does not need long time. Coleman et al used thermal cycling and on-off cycling as an acceleration test. Song et al showed that hydrogen shortage decreased the electrode performance more rapidly than that of air shortage in gas shortage test. Honji et al reported that the rate of coarsening of Pt particle is rapid in open circuit potential and this is one of major causes on the performance degradation of electrode. The cathode performance has been studied by using acid absorption, acceleration and ac-impedance measurements as functions of the polytetrafluoroethylene (PTFE) contents and sintering temperatures of the electrode.

  20. Concentration of WWER-1000 unit power on one site

    International Nuclear Information System (INIS)

    Rousek, J.; Kysel, J.; Sladek, V.

    1987-01-01

    The problem of a suitable number of nuclear power plant units built on one site is discussed. Using an example of three sites being prepared now in Czechoslovakia, two alternatives - one with two WWER-1000 units, the other with four WWER-1000 units on one site - are evaluated from the viewpoint of long-range nuclear power development program in Czechoslovakia, costs, transmission of electric power and heat supply. (author). 10 tabs., 13 refs

  1. Tsunami hazard assessment on nuclear power plant site evaluation accordance on DS 417

    International Nuclear Information System (INIS)

    Akhmad Khusyairi

    2011-01-01

    Nuclear power plant site evaluation should conduct the hazard evaluation on tsunami. Global climate changes and particularly extreme meteorology and hydrology phenomena have an impact on the structure, systems and important components related to safety. Therefore, IAEA makes efforts to revise the IAEA Safety Standard Series NS-G 3.4, Meteorological Events in Site Evaluation for Nuclear Power Plants and IAEA safety standard series NS-G 3.5 Flood Hazard For Nuclear Power Plants On Coastal And River Sites, in order to provide protection against the public and the environment safety due to operation of nuclear power plants. There are two methods used in assessing tsunami hazard, probabilistic and deterministic methods. In the tsunami hazard assessment, some necessary information and data should be obtained to determine the basic design of tsunami hazard during designing nuclear power plants, especially the cooling system design. Flooding caused tsunami must be evaluated to determine the site protection system. Furthermore, There must be an evaluation on either coincident event or meteorological simultaneously tsunami event that caused the worst effect on the site. Therefore, the protection of the site from extreme tsunami can be planned. (author)

  2. Fuel cell programs in the United States for stationary power applications

    Energy Technology Data Exchange (ETDEWEB)

    Singer, M.

    1996-04-01

    The Department of Energy (DOE), Office of Fossil Energy, is participating with the private sector in sponsoring the development of molten carbonate fuel cell (MCFC) and solid oxide fuel cell (SOFC) technologies for application in the utility, commercial and industrial sectors. Phosphoric acid fuel cell (PAFC) development was sponsored by the Office of Fossil Energy in previous years and is now being commercialized by the private sector. Private sector participants with the Department of Energy include the Electric Power Research Institute (EPRI), the Gas Research institute (GRI), electric and gas utilities, universities, manufacturing companies and their suppliers. through continued government and private sector support, fuel cell systems are emerging power generation technologies which are expected to have significant worldwide impacts. An industry with annual sales of over a billion dollars is envisioned early in the 21st century. PAFC power plants have begun to enter the marketplace and MCFC and SOFC power plants are expected to be ready to enter the marketplace in the late 1990s. In support of the efficient and effective use of our natural resources, the fuel cell program seeks to increase energy efficiency and economic effectiveness of power generation. This is to be accomplished through effectiveness of power generation. This is accomplished through the development and commercialization of cost-effective, efficient and environmentally desirable fuel cell systems which will operate on fossil fuels in multiple and end use sectors.

  3. Power failure at CERN Meyrin site

    CERN Multimedia

    2006-01-01

    The power failure, which occured at 7:47 on the morning of Saturday 29 July, was caused by a short-circuit in a 66 kV substation on the Meyrin site. The automatic reconfiguration of the network did not work as planned for a number of reasons, all of which are now well understood. As a result all the normal power networks on the Meyrin site, for the SPS and the LHC general services, were down. The secured power supply on the Meyrin site is provided by a set of three diesel motor driven power generators. All three diesel engines started correctly, but only one power generator could be correctly engaged. The single power generator's diesel motor ran for 45 minutes but was stopped automatically due to a mechanical fault. The reasons for these failures are being investigated. At that point, the Meyrin site and LHC Point 1 did not have a secured power network. The secured power networks for all the other LHC points worked as expected with their local diesel generators. The normal power network for the SPS and LHC ...

  4. Demonstration of an on-site PAFC cogeneration system with waste heat utilization by a new gas absorption chiller

    Energy Technology Data Exchange (ETDEWEB)

    Urata, Tatsuo [Tokyo Gas Company, LTD, Tokyo (Japan)

    1996-12-31

    Analysis and cost reduction of fuel cells is being promoted to achieve commercial on-site phosphoric acid fuel cells (on-site FC). However, for such cells to be effectively utilized, a cogeneration system designed to use the heat generated must be developed at low cost. Room heating and hot-water supply are the most simple and efficient uses of the waste heat of fuel cells. However, due to the short room-heating period of about 4 months in most areas in Japan, the sites having demand for waste heat of fuel cells throughout the year will be limited to hotels and hospitals Tokyo Gas has therefore been developing an on-site FC and the technology to utilize tile waste heat of fuel cells for room cooling by means of an absorption refrigerator. The paper describes the results of fuel cell cogeneration tests conducted on a double effect gas absorption chiller heater with auxiliary waste heat recovery (WGAR) that Tokyo Gas developed in its Energy Technology Research Laboratory.

  5. Evolution of the on-site electric power sources on French 900 MWe PWRs

    Energy Technology Data Exchange (ETDEWEB)

    Bera, Jean [Commissariat a l' Energie Atomique, Centre d' Etudes Nucleaires de Fontenay-aux-Roses, Departement d' Analyse de Surete, Service d' Analyse Fonctionnelle, Institut de Protection et Surete Nucleaire, B.P. No. 6, 92260 Fontenay-aux-Roses (France)

    1986-02-15

    Additional means have been provided on the French 900 MWe PWRs to improve safety if both the off-site and on-site Power sources are lost, namely: - a primary pump seal water injection device, one for two units; - a gas turbine generator for each site; - supplying any failing unit with electric power from a house load operating unit; - supplying a unit from a diesel generator of another unit. (author)

  6. Design characteristics of EU-APR1400 on-site power system

    International Nuclear Information System (INIS)

    Kim, D.H.; Kim, Y.S.; Kim, Y.S.

    2014-01-01

    In the global nuclear market, US and European design requirements have been largely used to develop the design of nuclear power plants(NPPs). The APR1400 design was developed on the basis of US regulatory guide and EPRI utility requirements document(URD). In order to enlarge the export market of APR1400, KHNP (Korea Hydro & Nuclear Power Co., Ltd) has developed the EU-APR1400 design which complies with the European nuclear design requirements. In this paper, the design characteristics of EU-APR1400 on-site power system developed according to the European design requirements of electrical power system are described. The European main design requirements of electrical power system involve 50 Hz rated frequency, 400/110 kV grid voltage, the application of the diversity and the redundancy, and so on. The EU-APR1400 on-site power system has been developed on the basis of these requirements. The representative designs include the redundancy, diversity, independence design, the emergency power supply design, the design for providing electrical power to the dedicated severe accident systems, and the design for European grid requirements. (author)

  7. Site survey for nuclear power plants

    International Nuclear Information System (INIS)

    1984-01-01

    This Safety Guide describes the first stage of the siting process for nuclear power plants - the site survey to select one or more preferred candidate sites. Its purpose is to recommend procedures and provide information for use in implementing a part of the Code of Practice on Safety in Nuclear Power Plant Siting (IAEA Safety Series No.50-C-S). The organization, procedures, methodologies, guidance for documenting the site survey process and examples of detailed procedures on some safety-related site characteristics are given in the Guide

  8. Blasting jobs on the building site of the Temelin nuclear power plant

    International Nuclear Information System (INIS)

    Voda, J.; Podel, R.

    1984-01-01

    The problems are discussed of the preparation and implementation on the Temelin nuclear power plant building site of blasting, the volume of drilling and the choice of the drill hammer - all based on experience gained during the construction of the Mochovce nuclear power plant. The amount of explosives used on the Temelin site will be 1400 t. The use of mechanical charging may shorten the preparation of the site by 20 to 30%. Explosive emulsion slurries are being developed from home raw materials whose application will reduce the volume of drilling by 15%. The method of controlled breaking secures adequate quality of peripheral walls and bottom chink but special explosives will have to be used. Seismic effects are discussed of blasting on dwellings, agricultural and industrial buildings in the vicinity of the site, on-site buildings, underground mains and special structures of the nuclear power plant. (E.S.)

  9. Utility survey on nuclear power plant siting and nuclear energy centers

    International Nuclear Information System (INIS)

    Cope, D.F.; Bauman, H.F.

    1977-01-01

    Most of the large U.S. utilities were surveyed by telephone and mail on questions concerning nuclear power plant siting and nuclear energy centers (NECs). The main purpose of the survey was for guidance of ERDA's NEC program. The questions covered the following topics: availability of sites; impact of environmental and other restraints; plans for development of multi-unit sites; interest in NEC development; interest in including fuel-cycle facilities in NECs; and opinions on the roles desired for the state and Federal governments in power plant siting. The main conclusion of the survey was that, while many utilities were considering multiple-unit sites of 2 to 5 units, none were planning larger energy centers at the present time. However, several expressed interest in NECs as a long-range future development

  10. Activities dedicated to FCPP commercialization at Toshiba

    Energy Technology Data Exchange (ETDEWEB)

    Ikeda, Shin-ichi; Ozono, Jiro; Sato, Nobuaki [Toshiba Corp., Tokyo (Japan)

    1996-12-31

    The present line-up of fuel cell power plants (FCPPs) at Toshiba consists of 11MW FCPP for pressurized operation, 1000kW on-site FCPP and 200kW on-site FCPP. In these, an 11MW FCPP installed at Goi Power Station of Tokyo Electric Power Company (TEPCO) is providing valuable experience through more than 20,000 cumulative hours of operation. Also, a 1000kW on-site FCPP, which Toshiba manufactured under the joint program of NEDO and PAFC Technology Research Association, has cumulative operation of 7,500 hours. Toshiba, however, believes that the 200kW on-site FCPP is the leader in the commercialization of phosphoric acid FCPP. This paper therefore presents the development status of 200kW power plants and our strategic considerations for full commercialization of PC25 type 200kW FCPP.

  11. Some issues on radiological consequences analysis in site selection for nuclear power stations

    International Nuclear Information System (INIS)

    Chen Xiaoqiu; Yue Huiguo

    2006-01-01

    The three considerations, Site safety and environmental protection and emergency preparedness, are the focus of attention in the evaluation of the suitability of a site for nuclear power station. This paper summarized the basic regulatory requirements for the siting of nuclear power station, described the existing problems on radiological consequences analyses during the siting stage and discussed the is- sues that need to concern in the reviewing of the radiological consequences analyses in the siting appraisal stage. (authors)

  12. Application profile and requirements on fuel cell heat-and-power stations; Einsatzprofil und Anforderungen an Brennstoffzellen-HKW

    Energy Technology Data Exchange (ETDEWEB)

    Kruhl, J

    1999-12-31

    In centralized power supply systems, maximum electrical efficiency is required in order to achieve competitiveness with high-efficiency combined-cycle systems. Combined systems of high-temperature fuel cells (MCFC/SOFC) with integrated gas or steam turbine processes are a promising option. In decentralized power supply, low-temperature and medium-temperature fuel cells (PEMFC/PAFC) may be feasible as well provided that the temperature characteristic of the demand side permits the use of the heat generated. In view of the decreasing heat demand of classic cogeneration structures, costly district heating will in the long run be replaced by building-specific cogeneration solutions. In this field, high-efficiency fuel cell systems have advantages over small-scale cogeneration units. If power-specific investments are low, the new technology may be more favourable than separate supply systems with networks and heating boilers and, in consequence, may gain wider acceptance. (orig.) [Deutsch] In der zentralen Stromerzeugung erfordert der Wettbewerb mit hocheffizienten GuD-Anlagen die Maximierung des elektrischen Wirkungsgrades. Hierzu bieten sich Kombianlagen aus Hochtemperatur-Brennstoffzellen (MCFC/SOFC) mit integrierten Dampf- bzw. Gasturbinen-Prozessen an. Im dezentralen Versorgungsbereich bieten zusaetzlich Nieder- und Mitteltemperatur-Brennstoffzellen (PEMFC/PAFC) ein hohes Einsatzpotential, sofern die Temperaturcharakteristik des Bedarfs eine Nutzbarkeit der entstehenden Waerme zulaesst. Unter dem Aspekt des zukuenftig sinkenden Waermebedarfs klassischer KWK-Strukturen wird die kostenintensive Nahwaermeversorgung zunehmend durch gebaeudespezifische KWK-Loesungen verdraengt werden. In diesem Bereich bieten hocheffiziente Brennstoffzellen-Systeme deutliche Vorteile gegenueber motorischen Klein-BHKW. Werden hier geringe leistungsspezifische Investitionen erreicht, kann eine Wirtschaftlichkeit gegenueber der getrennten Versorgung durch Netz und Heizkessel gegeben sein

  13. Customer adoption of small-scale on-site power generation

    Energy Technology Data Exchange (ETDEWEB)

    Siddiqui, Afzal S.; Marnay, Chris; Hamachi, Kristina S.; Rubio, F. Javier

    2001-04-01

    The electricity supply system is undergoing major regulatory and technological change with significant implications for the way in which the sector will operate (including its patterns of carbon emissions) and for the policies required to ensure socially and environmentally desirable outcomes. One such change stems from the rapid emergence of viable small-scale (i.e., smaller than 500 kW) generators that are potentially competitive with grid delivered electricity, especially in combined heat and power configurations. Such distributed energy resources (DER) may be grouped together with loads in microgrids. These clusters could operate semi-autonomously from the established power system, or macrogrid, matching power quality and reliability more closely to local end-use requirements. In order to establish a capability for analyzing the effect that microgrids may have on typical commercial customers, such as office buildings, restaurants, shopping malls, and grocery stores, an economic mod el of DER adoption is being developed at Berkeley Lab. This model endeavors to indicate the optimal quantity and type of small on-site generation technologies that customers could employ given their electricity requirements. For various regulatory schemes and general economic conditions, this analysis produces a simple operating schedule for any installed generators. Early results suggest that many commercial customers can benefit economically from on-site generation, even without considering potential combined heat and power and reliability benefits, even though they are unlikely to disconnect from the established power system.

  14. Customer adoption of small-scale on-site power generation

    International Nuclear Information System (INIS)

    Siddiqui, Afzal S.; Marnay, Chris; Hamachi, Kristina S.; Rubio, F. Javier

    2001-01-01

    The electricity supply system is undergoing major regulatory and technological change with significant implications for the way in which the sector will operate (including its patterns of carbon emissions) and for the policies required to ensure socially and environmentally desirable outcomes. One such change stems from the rapid emergence of viable small-scale (i.e., smaller than 500 kW) generators that are potentially competitive with grid delivered electricity, especially in combined heat and power configurations. Such distributed energy resources (DER) may be grouped together with loads in microgrids. These clusters could operate semi-autonomously from the established power system, or macrogrid, matching power quality and reliability more closely to local end-use requirements. In order to establish a capability for analyzing the effect that microgrids may have on typical commercial customers, such as office buildings, restaurants, shopping malls, and grocery stores, an economic mod el of DER adoption is being developed at Berkeley Lab. This model endeavors to indicate the optimal quantity and type of small on-site generation technologies that customers could employ given their electricity requirements. For various regulatory schemes and general economic conditions, this analysis produces a simple operating schedule for any installed generators. Early results suggest that many commercial customers can benefit economically from on-site generation, even without considering potential combined heat and power and reliability benefits, even though they are unlikely to disconnect from the established power system

  15. Nuclear power: Siting and safety

    International Nuclear Information System (INIS)

    Openshaw, S.

    1986-01-01

    By 2030, half, or even two-thirds, of all electricity may be generated by nuclear power. Major reactor accidents are still expected to be rare occurrences, but nuclear safety is largely a matter of faith. Terrorist attacks, sabotage, and human error could cause a significant accident. Reactor siting can offer an additional, design-independent margin of safety. Remote geographical sites for new plants would minimize health risks, protect the industry from negative changes in public opinion concerning nuclear energy, and improve long-term public acceptance of nuclear power. U.K. siting practices usually do not consider the contribution to safety that could be obtained from remote sites. This book discusses the present trends of siting policies of nuclear power and their design-independent margin of safety

  16. Assessment of On-Site Power Opportunities in the Industrial Sector; TOPICAL

    International Nuclear Information System (INIS)

    Bryson, T.

    2001-01-01

    The purpose of this report is to identify the potential for on-site power generation in the U.S. industrial sector with emphasis on nine industrial groups called the ''Industries of the Future'' (IOFs) by the U.S. Department of Energy (DOE). Through its Office of Industrial Technologies (OIT), the DOE has teamed with the IOFs to develop collaborative strategies for improving productivity, global competitiveness, energy usage and environmental performance. Total purchases for electricity and steam for the IOFs are in excess of$27 billion annually. Energy-related costs are very significant for these industries. The nine industrial groups are: (1) Agriculture (SIC 1); (2) Forest products; (3) Lumber and wood products (SIC 24); (4) Paper and allied products (SIC 26); (5) Mining (SIC 11, 12, 14); (6) Glass (SIC 32); (7) Petroleum (SIC 29); (8) Chemicals (SIC 28); and (9) Metals (SIC 33)-Steel, Aluminum, Metal casting. Although not currently part of the IOF program, the food industry is included in this report because of its close relationship to the agricultural industry and its success with on-site power generation. On-site generation provides an alternative means to reduce energy costs, comply with environmental regulations, and ensure a reliable power supply. On-site generation can ease congestion in the local utility's electric grid. Electric market restructuring is exacerbating the price premium for peak electricity use and for reliability, creating considerable market interest in on-site generation

  17. Code on the safety of nuclear power plants: Siting

    International Nuclear Information System (INIS)

    1988-01-01

    This Code provides criteria and procedures that are recommended for safety in nuclear power plant siting. It forms part of the Agency's programme for establishing Codes and Safety Guides relating to land based stationary thermal neutron power plants

  18. Nuclear power plant siting

    International Nuclear Information System (INIS)

    Sulkiewicz, M.; Navratil, J.

    The construction of a nuclear power plant is conditioned on territorial requirements and is accompanied by the disturbance of the environment, land occupation, population migration, the emission of radioactive wastes, thermal pollution, etc. On the other hand, a nuclear power plant makes possible the introduction of district heating and increases the economic and civilization activity of the population. Due to the construction of a nuclear power plant the set limits of negative impacts must not be exceeded. The locality should be selected such as to reduce the unfavourable effects of the plant and to fully use its benefits. The decision on the siting of the nuclear power plant is preceded by the processing of a number of surveys and a wide range of documentation to which the given criteria are strictly applied. (B.H.)

  19. Managing Siting Activities for Nuclear Power Plants

    International Nuclear Information System (INIS)

    2012-01-01

    One of the IAEA's statutory objectives is to ''seek to accelerate and enlarge the contribution of atomic energy to peace, health and prosperity throughout the world''. One way this objective is achieved is through the publication of a range of technical series. Two of these are the IAEA Nuclear Energy Series and the IAEA Safety Standards Series. According to Article III.A.6 of the IAEA Statute, the safety standards establish 'standards of safety for protection of health and minimization of danger to life and property.' The safety standards include the Safety Fundamentals, Safety Requirements and Safety Guides. These standards are written primarily in a regulatory style, and are binding on the IAEA for its own programmes. The principal users are the regulatory bodies in Member States and other national authorities. The IAEA Nuclear Energy Series comprises reports designed to encourage and assist R and D on, and application of, nuclear energy for peaceful uses. This includes practical examples to be used by owners and operators of utilities in Member States, implementing organizations, academia, and government officials, among others. This information is presented in guides, reports on technology status and advances, and best practices for peaceful uses of nuclear energy based on inputs from international experts. The IAEA Nuclear Energy Series complements the IAEA Safety Standards Series. The introduction of nuclear power brings new challenges to States - one of them being the selection of appropriates sites. It is a project that needs to begin early, be well managed, and deploy good communications with all stakeholders; including regulators. This is important, not just for those States introducing nuclear power for the first time, but for any State looking to build a new nuclear power plant. The purpose of the siting activities goes beyond choosing a suitable site and acquiring a licence. A large part of the project is about producing and maintaining a validated

  20. Managing Siting Activities for Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2012-06-15

    One of the IAEA's statutory objectives is to ''seek to accelerate and enlarge the contribution of atomic energy to peace, health and prosperity throughout the world''. One way this objective is achieved is through the publication of a range of technical series. Two of these are the IAEA Nuclear Energy Series and the IAEA Safety Standards Series. According to Article III.A.6 of the IAEA Statute, the safety standards establish 'standards of safety for protection of health and minimization of danger to life and property.' The safety standards include the Safety Fundamentals, Safety Requirements and Safety Guides. These standards are written primarily in a regulatory style, and are binding on the IAEA for its own programmes. The principal users are the regulatory bodies in Member States and other national authorities. The IAEA Nuclear Energy Series comprises reports designed to encourage and assist R and D on, and application of, nuclear energy for peaceful uses. This includes practical examples to be used by owners and operators of utilities in Member States, implementing organizations, academia, and government officials, among others. This information is presented in guides, reports on technology status and advances, and best practices for peaceful uses of nuclear energy based on inputs from international experts. The IAEA Nuclear Energy Series complements the IAEA Safety Standards Series. The introduction of nuclear power brings new challenges to States - one of them being the selection of appropriates sites. It is a project that needs to begin early, be well managed, and deploy good communications with all stakeholders; including regulators. This is important, not just for those States introducing nuclear power for the first time, but for any State looking to build a new nuclear power plant. The purpose of the siting activities goes beyond choosing a suitable site and acquiring a licence. A large part of the project is about producing and maintaining a validated

  1. Hinkley Point 'C' power station public enquiry: proof of evidence on coal fired power station sites

    Energy Technology Data Exchange (ETDEWEB)

    Fothergill, S.; Witt, S.

    1988-11-01

    The Coalfield Communities Campaign (CCC) has argued that if a new base-load power station is required it should be coal-fired rather than nuclear, and that it should use UK coal. Proposals for new power stations at both Hinkley Point and at Fawley have encountered very considerable local and regional opposition, and this is increasingly likely to be the case at many other sites especially in Southern England. In contrast the CCC has sought to demonstrate that its member authorities would generally welcome the development of new coal-fired capacity on appropriate sites within their areas. In particular, this proof establishes that there is a prima facie case for considering three sites - Thorpe Marsh, Hams Hall and Uskmouth - as potential locations for a new large coal-fired power station as an alternative to Hinkley Point C. The relevant local authorities have expressed their willingness to co-operate in more detailed planning or technical investigations to secure a coal-fired power station on these sites. The CCC considers this to be a major and unprecedented offer to the CEGB and its successor bodies, which could greatly speed the development of new power staion capacity and be of considerable economic and social benefit to coalfield communities.

  2. Manual on quality assurance for the survey, evaluation and confirmation of nuclear power plant sites

    International Nuclear Information System (INIS)

    1987-04-01

    The present Manual on Quality Assurance for the Survey, Evaluation and Confirmation of Nuclear Power Plant Sites contains supporting material and illustrates examples for implementing the requirements contained in the Code of Practice on Quality Assurance for Safety in Nuclear Power Plants to the activities of survey, evaluation and confirmation of nuclear power plant sites. At the same time the Code of Practice for Safety in Nuclear Power Plant Siting, and Safety Guides in the siting series contain requirements and recommendations to implement a quality assurance programme in selected activities of the siting process. This manual is intended to provide guidance and illustrate examples on this implementation. During preparation and reviews of this Manual it was found out that the methodology of implementation of the quality assurance programme in siting activities is still under development. For these reasons it was considered appropriate to publish this Manual as a temporary publication for trial use

  3. An updated assessment of the prospects for fuel cells in stationary power and CHP. An information paper

    Energy Technology Data Exchange (ETDEWEB)

    Sanderson, T.K. [Future Energy Solutions, Harwell (United Kingdom)

    2005-07-01

    This report presents updated conclusions of the Department of Trade and Industry's research and development programme to assess the commercial prospects for advanced fuel cells in stationary power and combined heat and power (CHP) systems. The programme has focussed on low temperature solid polymer fuel cells (SPFCs) for transport and combined heat and power (CHP)/distributed power and high temperature solid oxide fuel cells (SOFCs) for CHP/distributed power. As well as assessing the prospects for SPFCs and SOFCs in stationary power and CHP applications, the report examines those for molten carbonate fuel cells (MCFCs) and phosphoric acid fuel cells (PAFCs). The report provides an assessment of the status of technology development for these different types of fuel cells in terms of applications to stationary power and CHP, and offers estimates of market potential for SOFCs in CHP markets, SPFCs in CHP markets and SOFCs in distributed power generation markets. Both large SPFC and SOFC CHP systems require further development to deliver the necessary cost reductions in materials and manufacturing processes before pre-commercial sales can begin. The routes taken by different manufacturers and their choice of preferred technology are explained. A discussion of the prospects and barriers for fuel cell cars concludes that while cost reduction is a major barrier to the successful commercialisation of fuel cells, there are insufficient data available from operating fuel cells systems (other than PAFC) in stationary power and CHP applications to assess the economic attractiveness of fuel cells compared with existing systems. More field trials are required to confirm energy and environmental performance in such applications and to evaluate operational and economic performance under commercial operating conditions. Such field trials could also provide a focus for the required developments in fuel cells for stationary power/CHP systems.

  4. Siting nuclear power plants

    International Nuclear Information System (INIS)

    Yellin, J.; Joskow, P.L.

    1980-01-01

    The first edition of this journal is devoted to the policies and problems of siting nuclear power plants and the question of how far commercial reactors should be placed from urban areas. The article is divided into four major siting issues: policies, risk evaluation, accident consequences, and economic and physical constraints. One concern is how to treat currently operating reactors and those under construction that were established under less-stringent criteria if siting is to be used as a way to limit the consequences of accidents. Mehanical cost-benefit analyses are not as appropriate as the systematic use of empirical observations in assessing the values involved. Stricter siting rules are justified because (1) opposition because of safety is growing: (2) remote siting will make the industry more stable; (3) the conflict is eliminated between regulatory policies and the probability basis for nuclear insurance; and (4) joint ownership of utilities and power-pooling are increasing. 227 references, 7 tables

  5. Demonstrating the benefits of fuel cells: further significant progress towards commercialisation

    Energy Technology Data Exchange (ETDEWEB)

    Anon,

    1995-01-01

    The fourteenth Fuel Cell Seminar held in San Diego, California in 1994 is reported. The phosphoric acid fuel cell (PAFC) is the closest to widespread commercialization. PAFC cogeneration plants have to be shown to compare favourable in reliability with current mature natural gas-fuelled engine and turbine technologies. Although highly efficient, further development is necessary to produce cost effective generators. Progress is being made on proton exchange membrane fuel cell (PEMFC) stationary power plants, too, which may prove to be cost effective. In view of its lower operating temperature, at below 100[sup o]C compared with about 200[sup o]C for the PAFC, the principal use of the PEMFC has been identified as powering vehicles. Fuel cells have significant environmental advantages but further capital cost reductions are necessary if they are to compete with established technologies. (UK)

  6. Expansion potential for existing nuclear power station sites

    Energy Technology Data Exchange (ETDEWEB)

    Cope, D. F.; Bauman, H. F.

    1977-09-26

    This report is a preliminary analysis of the expansion potential of the existing nuclear power sites, in particular their potential for development into nuclear energy centers (NECs) of 10 (GW(e) or greater. The analysis is based primarily on matching the most important physical characteristics of a site against the dominating site criteria. Sites reviewed consist mainly of those in the 1974 through 1976 ERDA Nuclear Power Stations listings without regard to the present status of reactor construction plans. Also a small number of potential NEC sites that are not associated with existing power stations were reviewed. Each site was categorized in terms of its potential as: a dispersed site of 5 GW(e) or less; a mini-NEC of 5 to 10 GW(e); NECs of 10 to 20 GW(e); and large NECs of more than 20 GW(e). The sites were categorized on their ultimate potential without regard to political considerations that might restrain their development. The analysis indicates that nearly 40 percent of existing sites have potential for expansion to nuclear energy centers.

  7. Expansion potential for existing nuclear power station sites

    International Nuclear Information System (INIS)

    Cope, D.F.; Bauman, H.F.

    1977-01-01

    This report is a preliminary analysis of the expansion potential of the existing nuclear power sites, in particular their potential for development into nuclear energy centers (NECs) of 10 (GW(e) or greater. The analysis is based primarily on matching the most important physical characteristics of a site against the dominating site criteria. Sites reviewed consist mainly of those in the 1974 through 1976 ERDA Nuclear Power Stations listings without regard to the present status of reactor construction plans. Also a small number of potential NEC sites that are not associated with existing power stations were reviewed. Each site was categorized in terms of its potential as: a dispersed site of 5 GW(e) or less; a mini-NEC of 5 to 10 GW(e); NECs of 10 to 20 GW(e); and large NECs of more than 20 GW(e). The sites were categorized on their ultimate potential without regard to political considerations that might restrain their development. The analysis indicates that nearly 40 percent of existing sites have potential for expansion to nuclear energy centers

  8. Power from waste. [Power plant at landfill site

    Energy Technology Data Exchange (ETDEWEB)

    Anon,

    1991-01-01

    Base Load Systems Ltd, a company in the United Kingdom, has just commissioned a power plant in Leicestershire which uses waste gases from a landfill site. The gases power two specially modified turbo charged engine and generator packages. The plant will use approximately 100 cu meters of landfill gas per hour and is expected to feed 1.5MW of electrical power into the supply network of East Midlands Electricity. Once the landfill site has been completely filled and capped with clay, it is estimated that the electrical power output will be 4 MW. At present, since their are no customers for heat in the vicinity, 100 KW of the electricity produced are used to run fans to dissipate the 2.5 MW of waste heat. Base load is also involved elsewhere in combined heat and power projects. (UK).

  9. Review of Investigations on Site Selection for Nuclear Power Plants in Croatia

    Energy Technology Data Exchange (ETDEWEB)

    Malbasa, N [Ekonerg, Zagreb (Croatia)

    2008-07-01

    A review of site investigation for nuclear facilities in the Republic of Croatia that had been performed from 1964, when investigation started for the first nuclear power plant, to 1994 when the activities were stopped, is presented therein. Brief results of the main investigation were presented including the Tanja site on the Danube upstream of Vukovar. It is the best of all the investigated locations for nuclear power plant in Croatia. The review of results for site selection of low and intermediate level of radioactive waste disposal is also given. The position of nuclear power plants in the strategic documents of the Republic of Croatia was analysed. It is concluded that the status of nuclear facilities in the main strategic documents must be improved because the energy future in Croatia - as almost in all European countries - could hardly be successful without any further development of nuclear energy.(author)

  10. Review of Investigations on Site Selection for Nuclear Power Plants in Croatia

    International Nuclear Information System (INIS)

    Malbasa, N.

    2008-01-01

    A review of site investigation for nuclear facilities in the Republic of Croatia that had been performed from 1964, when investigation started for the first nuclear power plant, to 1994 when the activities were stopped, is presented therein. Brief results of the main investigation were presented including the Tanja site on the Danube upstream of Vukovar. It is the best of all the investigated locations for nuclear power plant in Croatia. The review of results for site selection of low and intermediate level of radioactive waste disposal is also given. The position of nuclear power plants in the strategic documents of the Republic of Croatia was analysed. It is concluded that the status of nuclear facilities in the main strategic documents must be improved because the energy future in Croatia - as almost in all European countries - could hardly be successful without any further development of nuclear energy.(author)

  11. Site acceptability and power availability: needed institutional changes

    International Nuclear Information System (INIS)

    Haggard, J.E.

    1975-01-01

    Timely assurance of power plant site availability is threatened by institutional inabilities to resolve often competing environmental/energy requirements. Institutional changes are needed. The issue of site approval should be separated from that of plant approval. A ''one-stop'' forum for site approval, modeled after Washington State's Thermal Power Plant Siting Act, is needed. The one-stop process utilizes one forum composed of officials drawn from all agencies involved in site related issues. A joint Federal/State Siting Council, with sole jurisdiction over site approval, is recommended. The State Council would have a determinative vote on all issues not otherwise preempted by federal legislation. 21 references. (U.S.)

  12. MOLCARE development towards MCFC commercial power plants based on 500 kW standard modules

    Energy Technology Data Exchange (ETDEWEB)

    Torazza, A; Dufour, A; Perfumo, A; Ricerche, A; Gegundez, J; Sanson, F; Moreno, A

    1998-07-01

    Fuel cells technologies for stationary applications are expected to play a remarkable role in the field of next decade energy production systems ranging from some hundreds kW to some MW. The interest in using fuel cells to produce electric energy comes from the advantages that fuel cells offer in terms of high efficiency, good behavior at base and partial load, very low emissions, modularity (easy adjustment of plant capacity to power-demand increase), and reduced time to be spent for plant erection. At least four types of fuel cells can be considered suitable for stationary applications. With reference to their electrolyte they can be classified as: Polymeric Electrolyte Membrane Fuel Cells (PEMFC), Phosphoric Acid Fuel Cells (PAFC), Molten Carbonate Fuel Cells (MCFC) and Solid Oxide Fuel Cells (SOFC). Each of them works at a temperature level that is depending on the type of electrolyte. From a general point of view all the fuel cell technologies present, at various extents, the above listed advantages. Nevertheless specific features of each fuel cell type suggest to identify a specific field of application for each type of solution, in order to stress the potential advantages of any technology and minimize its possible drawbacks. Anyway the different level of maturity for the various fuel cell technologies does not allow an homogeneous comparison of technical and economical key parameters. PAFCs, due to their present commercial availability and operation experience, are well outlined in terms of performance and costs; on the contrary with regard to the other technologies--PEMFC, MCFC and SOFC--which are still under development, their commercialization is expected within a period of 7 to 13 years according to single technology maturity level (MCFC level seems to be more ready), kind of application, competitors, environmental constraints, etc.

  13. Seismic stability evaluation using 2-D FEM analysis for modeling nuclear power plants sited on gravel soil

    International Nuclear Information System (INIS)

    Iba, T.; Konno, T.; Irino, K.; Hama, I.; Oguro, E.; Iizuka, S.; Enami, A.

    1995-01-01

    Throughout Europe and the United States, many nuclear power plants have been built on Quaternary deposit sites. While in Japan, all nuclear power plants have been built at rock sites primarily to maintain a high seismic resistivity. However, as more nuclear power plants are planned for the future, it has become necessary to develop new siting technology from the stand point of expanding the available range of site selection and effective utilization of land. A draft on guidelines of the seismic design for siting on Quaternary deposits is being carried out with a purpose to ensure proper design and construction for such sites. (author). 10 figs., 2 tabs

  14. Electrochemical Power Sources

    Indian Academy of Sciences (India)

    ) (iv) Solid oxide fuel cells (SOFCs) (v) Poly- ... The advantages of PAFCs are that the phosphoric acid is very .... (as water is the only reaction product), and a thin electrolyte layer. Polymer electrolytes have excellent oxygen solubility and.

  15. Study on Quaternary ground siting of nuclear power plant, (1)

    International Nuclear Information System (INIS)

    Kokusho, Takaji; Nishi, Koichi; Honsho, Shizumitsu

    1991-01-01

    A seismic stability evaluation method for a nuclear power plant to be located on a Quaternary sandy/gravelly ground is discussed herein in terms of the geological and geotechnical survey, design earthquake motion evaluation and geotechnical seismic stability analyses. The geological and geotechnical exploration tunnel in the rock-foundation siting will be difficult in the Quaternary ground siting. Boring, geophysical surveys and soil samplings will play a major role in this case. The design earthquake input spectrum for this siting is proposed so as to take account the significant effect of longer period motion on the ground stability. Equivalent and non-linear analyses demonstrate the seismic stability of the foundation ground so long as the soil density is high. (author)

  16. Alternative off-site power supply improves nuclear power plant safety

    International Nuclear Information System (INIS)

    Gjorgiev, Blaže; Volkanovski, Andrija; Kančev, Duško; Čepin, Marko

    2014-01-01

    Highlights: • Additional power supply for mitigation of the station blackout event in NPP is used. • A hydro power plant is considered as an off-site alternative power supply. • An upgrade of the probabilistic safety assessment from its traditional use is made. • The obtained results show improvement of nuclear power plant safety. - Abstract: A reliable power system is important for safe operation of the nuclear power plants. The station blackout event is of great importance for nuclear power plant safety. This event is caused by the loss of all alternating current power supply to the safety and non-safety buses of the nuclear power plant. In this study an independent electrical connection between a pumped-storage hydro power plant and a nuclear power plant is assumed as a standpoint for safety and reliability analysis. The pumped-storage hydro power plant is considered as an alternative power supply. The connection with conventional accumulation type of hydro power plant is analysed in addition. The objective of this paper is to investigate the improvement of nuclear power plant safety resulting from the consideration of the alternative power supplies. The safety of the nuclear power plant is analysed through the core damage frequency, a risk measure assess by the probabilistic safety assessment. The presented method upgrades the probabilistic safety assessment from its common traditional use in sense that it considers non-plant sited systems. The obtained results show significant decrease of the core damage frequency, indicating improvement of nuclear safety if hydro power plant is introduced as an alternative off-site power source

  17. Argentinian experience in selecting sites for nuclear power stations

    International Nuclear Information System (INIS)

    Csik, B.J.

    1975-01-01

    One nuclear power station is in operation in the Republic of Argentina, a second is under construction, and the decision to build a third has been taken. According to existing plans, about ten nuclear power stations should go into operation during the next decade. The present paper analyses the experience acquired in selecting sites for the first units, commenting on the criteria and methods applied, the studies that were carried out, the specific problems encountered and the solutions adopted, as well as on the question of acceptance of the chosen sites by the public. It goes on to describe the current programme of selection and study of sites for future nuclear power stations

  18. Environmental, health, and safety issues of fuel cells in transportation. Volume 1: Phosphoric acid fuel-cell buses

    Energy Technology Data Exchange (ETDEWEB)

    Ring, S

    1994-12-01

    The U.S. Department of Energy (DOE) chartered the Phosphoric Acid Fuel-Cell (PAFC) Bus Program to demonstrate the feasibility of fuel cells in heavy-duty transportation systems. As part of this program, PAFC- powered buses are being built to meet transit industry design and performance standards. Test-bed bus-1 (TBB-1) was designed in 1993 and integrated in March 1994. TBB-2 and TBB-3 are under construction and should be integrated in early 1995. In 1987 Phase I of the program began with the development and testing of two conceptual system designs- liquid- and air-cooled systems. The liquid-cooled PAFC system was chosen to continue, through a competitive award, into Phase H, beginning in 1991. Three hybrid buses, which combine fuel-cell and battery technologies, were designed during Phase III. After completing Phase II, DOE plans a comprehensive performance testing program (Phase HI) to verify that the buses meet stringent transit industry requirements. The Phase III study will evaluate the PAFC bus and compare it to a conventional diesel bus. This NREL study assesses the environmental, health, and safety (EH&S) issues that may affect the commercialization of the PAFC bus. Because safety is a critical factor for consumer acceptance of new transportation-based technologies the study focuses on these issues. The study examines health and safety together because they are integrally related. In addition, this report briefly discusses two environmental issues that are of concern to the Environmental Protection Agency (EPA). The first issue involves a surge battery used by the PAFC bus that contains hazardous constituents. The second issue concerns the regulated air emissions produced during operation of the PAFC bus.

  19. Care of personnel on the building site of the Dukovany nuclear power plant

    International Nuclear Information System (INIS)

    Kurial, P.

    1984-01-01

    The accommodation is described of workers on the building site of the Dukovany nuclear power plant. The quality is appraised of accommodation, catering and refreshments. There is a health care unit on site and 15 beds are reserved at the Trebic hospital for emergency cases. Trade union and youth organizations look after sports and cultural activities. (E.S.)

  20. Regional siting survey for thermal power plants in the state of Ohio

    International Nuclear Information System (INIS)

    Elkins, M.L.; DiNunno, J.J.

    1975-01-01

    The selection and evaluation of sites for power plants have become increasingly difficult in recent years as pressures from various societal segments have resulted in government restraints on selection and burning of fossil fuels, on methods of heat dissipation, on acquisition of transmission line rights-of-way, and on environmental impact in general. The key elements in successful application of power plant siting technology are the development of the proper balance among the basic siting considerations and the understanding that level of detail in a study varies in an inverse relationship with the siting area under examination. As the first step in the process of selection and eventual licensing of new thermal power plant sites for a utility in the State of Ohio, the entire state was screened to determine promising candidate regions large enough to offer several possible candidate sites for thermal power plants. Because of the size of the area under consideration and the advantages of developing sites with an ultimate capacity for more than one power plant, sites with an installed capacity of 1100 to 4400 MW(e) were considered for this study. As a result of the preliminary screening conducted in four distinct steps, three candidate regions showed the best overall promise for either nuclear or fossil-fueled power plant development. Tentative identification was made of candidate sites within these candidate regions, and follow-on studies conducted in an increasing level of detail are presently in progress to determine the candidate site(s) most promising for power plant siting. (U.S.)

  1. Collection and evaluation of complete and partial losses of off-site power at nuclear power plants

    International Nuclear Information System (INIS)

    Battle, R.E.

    1985-02-01

    Events involving loss of off-site power that have occurred at nuclear power plants through 1983 are described and categorized as complete or partial losses. The events were identified as plant-centered or grid-related failures. In addition, the causes of the failures were classified as weather, human error, design error, or hardware failure. The plant-centered failures were usually of shorter duration than the weather-related grid failures. For this reason, the weather-related events were reviewed in detail. Design features that may be important factors affecting off-site power system reliability were tabulated for most of the operating nuclear power plants. The tabulated information was provided to NRC for a statistical analysis to determine the importance of these design features for losses of off-site power. The frequency of losses of off-site power versus duration was estimated for three time periods. The frequency of loss of off-site power was estimated to be 0.09/reactor-year based on industry-wide data for the years 1959 through 1983

  2. Solar electric power for instruments at remote sites

    Science.gov (United States)

    McChesney, P.J.

    2000-01-01

    Small photovoltaic (PV) systems are the preferred method to power instruments operating at permanent locations away from the electric power grid. The low-power PV power system consists of a solar panel or small array of panels, lead-acid batteries, and a charge controller. Even though the small PV power system is simple, the job of supplying power at a remote site can be very demanding. The equipment is often exposed to harsh conditions. The site may be inaccessible part of the year or difficult and expensive to reach at any time. Yet the system must provide uninterrupted power with minimum maintenance at low cost. This requires good design. Successful small PV systems often require modifications by a knowledgeable fieldworker to adapt to conditions at the site. Much information is available in many places about solar panels, lead-acid batteries, and charging systems but very little of it applies directly to low power instrument sites. The discussion here aims to close some of the gap. Each of the major components is described in terms of this application with particular attention paid to batteries. Site problems are investigated. Finally, maintenance and test procedures are given. This document assumes that the reader is engaged in planning or maintaining low-power PV sites and has basic electrical and electronic knowledge. The area covered by the discussion is broad. To help the reader with the many terms and acronyms used, they are shown in bold when first used and a glossary is provided at the end of the paper.

  3. A survey of the underground siting of nuclear power plants

    International Nuclear Information System (INIS)

    Pinto, S.

    1979-12-01

    The idea of locating nuclear power plants underground is not new, since in the period of time between the late fifties and the early sixties, four small nuclear plants have been built in Europe in rock cavities. Safety has been, in general, the main motivation for such a siting solution. In the last years several factors such as increasing power transmission costs, decreasing number of suitable sites above ground, increased difficulties in obtaining site approval by the licensing authorities, increasing opposition to nuclear power, increasing concern for extreme - but highly improbable - accidents, together with the possibility of utilizing the waste heat and the urban siting concept have renewed the interest for the underground siting as an alternative to surface siting. The author presents a survey of the main studies carried out on the subject of underground siting. (Auth.)

  4. Losses of off-site power at U.S. nuclear power plants -- through 1995. Final report

    International Nuclear Information System (INIS)

    Wyckoff, H.

    1996-04-01

    This report provides a database and summary analysis of losses of off-site power at US nuclear generating units. It includes the 16 years 1980 through 1995. This is the twelfth update of this database and analysis. During 1994 there were no losses of all off-site power and in 1995 only two short losses. Both the short term and long term US loss of all off-site power experience is extremely favorable. The frequency of losing all off-site power is an important input to many nuclear plant safety assessments. The industry's loss of all off-site power experience that is set forth in this report can provide perspective to plant specific probabilistic safety assessments

  5. Data on loss of off-site electric power simulation tests of the high temperature engineering test reactor

    International Nuclear Information System (INIS)

    Takeda, Takeshi; Nakagawa, Shigeaki; Fujimoto, Nozomu; Tachibana, Yukio; Iyoku, Tatsuo

    2002-07-01

    The high temperature engineering test reactor (HTTR), the first high temperature gas-cooled reactor (HTGR) in Japan, achieved the first full power of 30 MW on December 7 in 2001. In the rise-to-power test of the HTTR, simulation tests on loss of off-site electric power from 15 and 30 MW operations were carried out by manual shutdown of off-site electric power. Because helium circulators and water pumps coasted down immediately after the loss of off-site electric power, flow rates of helium and water decreased to the scram points. To shut down the reactor safely, the subcriticality should be kept by the insertion of control rods and the auxiliary cooling system should cool the core continuously avoiding excessive cold shock to core graphite components. About 50 s later from the loss of off-site electric power, the auxiliary cooling system started up by supplying electricity from emergency power feeders. Temperature of hot plenum block among core graphite structures decreased continuously after the startup of the auxiliary cooling system. This report describes sequences of dynamic components and transient behaviors of the reactor and its cooling system during the simulation tests from 15 and 30 MW operations. (author)

  6. General report on the results of the development of fuel cell technology such as urban energy center. Evaluation study of life of phosphoric acid fuel cells (fiscal 1995 and 1996); Toshi energy center nado nenryo denchi gijutsu kaihatsu kenkyu seika sogo hokokusho. Rinsangata nenryo denchi jumyo hyoka kenkyu (1995 kara 1996 nendo)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    Receiving subsidies from MITI, NEDO carried out this project in fiscal 1995 and 1996 as a joint research with Technology Research Association for Phosphoric Acid Fuel Cell Power Generation System and others. The project aimed at developing the accelerated test method which can evaluate in a short time the cell life of phosphoric acid fuel cells (PAFC) and the lowering of characteristics. The accelerated test method of PAFC life is thought to be a tool indispensable for the promotion of commercialization, but the accelerated test method like the usual material evaluation has not yet been established. To solve this problem, procedures were developed to rationally plan the accelerated test on short stacks of full scale based on the small cell test data. Here, to rationally estimate the operational state under actual conditions based on the data on the accelerated test, it is necessary to fully understand the mechanism of deterioration of PAFC. By conducting in parallel the element study for the basic elucidation of cell deterioration phenomena, obtained was the useful information/knowledge which back up the results of the accelerated test scientifically. 168 figs., 33 tabs.

  7. Siting studies for new nuclear power plants in Argentina

    International Nuclear Information System (INIS)

    Barbaran, Gustavo A.

    2008-01-01

    This paper is a summary of the thesis prepared by the Group of Prospective and Energy Planning of the National Atomic Energy Commission for the 'Specialization on Applications of Nuclear Technology Course' of the Instituto Balseiro in 2007. It describes the evolution of siting studies through time and the main focus worldwide in this type of studies. Then, it makes a brief review of previous siting studies of nuclear power plants conducted in Argentina. It carries out a description of the methodology to conduct a site evaluation for nuclear power plants according to actual international criteria. Finally, it describes the licensing process that follows every site study. (author) [es

  8. Siting of light-water reactor power plants in the Federal Republic of Germany

    International Nuclear Information System (INIS)

    Kohler, H.A.G.

    1975-01-01

    The nuclear power plant site requirements formulated for environment protection in Germany allow nuclear power plants to be built at any site provided these requirements are duly taken into account in preparing and monitoring the site and in the design of the proposed power plant. After a brief discussion of light water reactor power plant sites, prevailing practice in site planning, site selection criteria, licensing procedure and used criteria, rules and guidelines, this paper reports on some considerations taken into account by the expert advisers and by the licensing authorities and future site planning. (orig.) [de

  9. Summary of wind data from nuclear power plant sites. [USA

    Energy Technology Data Exchange (ETDEWEB)

    Verholek, M. G.

    1977-03-01

    A summary of wind data from nuclear power plant sites is presented. National Weather Service archives are an immediately obvious source of wind data, but additional data sources are also available. Utility companies proposing to build nuclear power plants are required to establish on-site meteorological monitoring programs that include towers for collecting wind and temperature data for use in environmental impact assessments. These data are available for more than one hundred planned or operating nuclear power plant sites. A list of the sites, by state, is provided in Appendix A, while Appendix B contains an alphabetical list of the sites. This site wind data provides a valuable addition to the existing NWS data sets, and significantly enlarges the multilevel data presently available. The wind data published through the NRC is assembled and assessed here in order to provide a supplement to existing data sets.

  10. Nuclear Power Plant project site selection geotechnical considerations

    International Nuclear Information System (INIS)

    Katti, V.J.; Banerjee, D.C.

    1997-01-01

    During the selection of a site for Nuclear Power Plant (NPP) and Radioactive Waste Plant (RWP), geotechnical investigations play a significant role in deciding merits and demerits of the sites. Any accidents in these units can play havoc on mankind and may leave bitter imprints on generations to come. Hence proper care has to be taken at the early stage for selecting the sites. Site selection procedure is a complicated one, because it involves experts from various disciplines like geology, geophysics, civil, mechanical electrical engineering, health-physics and other fields

  11. Nuclear power plant site selection: a case study

    International Nuclear Information System (INIS)

    Lugasi, Y.; Mehrez, A.; Sinuany-Stern, Z.

    1985-01-01

    Selecting the site for a nuclear power plant involves the evaluation of numerous criteria and the professional judgment of various experts. The Israel Atomic Energy Commission has been concerned with the problem of selecting a site for a nuclear power station. Previous studies have been performed by the commission to identify potential sites. There were initial screenings where potential sites were chosen according to various minimal criteria and international standards. Only sites that met all the criteria were chosen. A study was made to find the most preferred site among the potential sites that met all the criteria. Two mathematical approaches were used: Keeney's multiattribute utility function and Saaty's eigenvalue prioritization technique. Both models ranked the same site as the most desirable; however, the models differed in their ranking of the other sites

  12. Site selection for new nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Rizzo, Paul C.; Dubinsky, Melissa; Tastan, Erdem Onur, E-mail: paul.rizzo@rizzoassoc.com, E-mail: melissa.dubinsky@rizzoassoc.com, E-mail: onur.tastan@rizzoassoc.com [RIZZO Associates Inc., Pittsburgh, PA (United States); Miano, Sandra C., E-mail: scm27@psu.edu [Eletrobras Termonuclear S.A. (ELETRONUCLEAR), RJ (Brazil); Pennsylvania State University, Department of Mechanical and Nuclear Engineering, State College, PA (United States)

    2015-07-01

    The current methodology for selecting the most advantageous site(s) for nuclear power plant (NPP) development is based on the latest evolution of protocols originally established in the 1990's by the Electric Power Research Institute (EPRI) and others for programs in the USA, and more recently by the International Atomic Energy Agency (IAEA), among others. The methodology includes protocols that account for lessons learned from both the Gen III projects and the catastrophic event at Fukushima, Japan. In general, the approach requires consideration of Exclusionary or 'fatal flaw' Criteria first, based on safety as well as significant impact to the environment or human health. Sites must meet all of these Exclusionary Criteria to be considered for NPP development. Next, the remaining sites are evaluated for Avoidance Criteria that affect primarily ease of construction and operations, which allow a ranking of sites best suited for NPP development. Finally, Suitability Criteria are applied to the potential sites to better differentiate between closely ranked sites. Generally, final selection of a Preferred and an Alternate Site will require balancing of factors, expert judgment, and client input, as sites being compared will differ in their scores associated with different Avoidance Criteria and Suitability Criteria. RIZZO Associates (RIZZO) offers in this paper a modification to this methodology for selecting the site for NPP development, which accords to the categories of Exclusionary, Avoidance and Suitability Criteria strict definitions which can be considered as Absolute Factors, Critical Factors, and Economic Factors for a more focused approach to site selection. Absolute Factors include all of the safety-related Exclusionary Criteria. Critical Factors are those that are difficult to overcome unless extraordinary mitigation measures are implemented; they have a significant impact on the ability of the project to be successful and may cause the

  13. Site selection for new nuclear power plants

    International Nuclear Information System (INIS)

    Rizzo, Paul C.; Dubinsky, Melissa; Tastan, Erdem Onur; Miano, Sandra C.

    2015-01-01

    The current methodology for selecting the most advantageous site(s) for nuclear power plant (NPP) development is based on the latest evolution of protocols originally established in the 1990's by the Electric Power Research Institute (EPRI) and others for programs in the USA, and more recently by the International Atomic Energy Agency (IAEA), among others. The methodology includes protocols that account for lessons learned from both the Gen III projects and the catastrophic event at Fukushima, Japan. In general, the approach requires consideration of Exclusionary or 'fatal flaw' Criteria first, based on safety as well as significant impact to the environment or human health. Sites must meet all of these Exclusionary Criteria to be considered for NPP development. Next, the remaining sites are evaluated for Avoidance Criteria that affect primarily ease of construction and operations, which allow a ranking of sites best suited for NPP development. Finally, Suitability Criteria are applied to the potential sites to better differentiate between closely ranked sites. Generally, final selection of a Preferred and an Alternate Site will require balancing of factors, expert judgment, and client input, as sites being compared will differ in their scores associated with different Avoidance Criteria and Suitability Criteria. RIZZO Associates (RIZZO) offers in this paper a modification to this methodology for selecting the site for NPP development, which accords to the categories of Exclusionary, Avoidance and Suitability Criteria strict definitions which can be considered as Absolute Factors, Critical Factors, and Economic Factors for a more focused approach to site selection. Absolute Factors include all of the safety-related Exclusionary Criteria. Critical Factors are those that are difficult to overcome unless extraordinary mitigation measures are implemented; they have a significant impact on the ability of the project to be successful and may cause the

  14. Development of portable fuel cells

    Energy Technology Data Exchange (ETDEWEB)

    Nakatou, K.; Sumi, S.; Nishizawa, N. [Sanyo Electric Co., Ltd., Osaka (Japan)

    1996-12-31

    Sanyo Electric has been concentrating on developing a marketable portable fuel cell using phosphoric acid fuel cells (PAFC). Due to the fact that this power source uses PAFC that operate at low temperature around 100{degrees} C, they are easier to handle compared to conventional fuel cells that operate at around 200{degrees} C , they can also be expected to provide extended reliable operation because corrosion of the electrode material and deterioration of the electrode catalyst are almost completely nonexistent. This power source is meant to be used independently and stored at room temperature. When it is started up, it generates electricity itself using its internal load to raise the temperature. As a result, the phosphoric acid (the electolyte) absorbs the reaction water when the temperature starts to be raised (around room temperature). At the same time the concentration and volume of the phosphoric acid changes, which may adversely affect the life time of the cell. We have studied means for starting, operating PAFC stack using methods that can simply evaluate changes in the concentration of the electrolyte in the stack with the aim of improving and extending cell life and report on them in this paper.

  15. Case study of siting technology for underground nuclear power plant

    International Nuclear Information System (INIS)

    Hibino, Satoshi; Komada, Hiroya; Honsho, Shizumitsu; Fujiwara, Yoshikazu; Motojima, Mutsumi; Nakagawa, Kameichiro; Nosaki, Takashi

    1991-01-01

    Underground siting method is one of new feasible siting methods for nuclear power plants. This report presents the results on case studies on underground siting. Two sites of a steeply inclined and plateau like configurations were selected. 'Tunnel type cavern; all underground siting' method was applied for the steeply inclined configuration, and 'shaft type semi-cavern; partial underground siting' method was applied for the plateau like configuration. The following designs were carried out for these two sites as case studies; (1) conceptual designs, (2) geological surveys and rock mechanics tests, (3) stability analysis during cavern excavations, (4) seismic stability analysis of caverns during earthquake, (5) reinforcement designs for caverns, (6) drainage designs. The case studies showed that these two cases were fully feasible, and comparison between two cases revealed that the 'shaft type semi-cavern; partial underground siting' method was more suitable for Japanese islands. As a first step of underground siting, therefore, the authors recommend to construct a nuclear power plant by this method. (author)

  16. Design basis flood for nuclear power plants on river sites

    International Nuclear Information System (INIS)

    1983-01-01

    The Guide presents techniques for determining the design basis flood (DBF) to be used for siting nuclear power plants at or near non-tidal reaches of rivers and for protecting nuclear power plants against floods. Since flooding of a nuclear power plant can have repercussions on safety, the DBF is always chosen to have a very low probability of exceedance per annum. The DBF may result from one or more of the following causes: (1) Precipitation, snowmelt; (2) Failure of water control structures, either from seismic or hydrological causes or from faulty operation of these structures; (3) Channel obstruction such as landslide, ice effects, log or debris jams, and effects of vulcanism. Normally the DBF is not less than any recorded or historical flood occurrence. For flood evaluation two types of methods are discussed in this Guide: probabilistic and deterministic. Simple probabilistic methods to determine floods of such low exceedance probability have a great degree of uncertainty and are presented for use only during the site survey. However, the more sophisticated probabilistic methods, the so-called stochastic methods, may give an acceptable result, as outlined in this Guide. The preferred method of evaluating the component of the DBF due to precipitation, as described in this Guide, is the deterministic one, based on the concept of a limit to the probable maximum precipitation (PMP) and on the unit hydrograph technique. Dam failures may generate a flood substantially more severe than that due to precipitation. The methodology for evaluating these types of floods is therefore presented in this Guide. Making allowance for the possible simultaneous occurrence of two or more important flood-producing events is also discussed here. The Guide does not deal with floods caused by sabotage

  17. Anti-nuclear activities and critics concerning nuclear power plant sites

    International Nuclear Information System (INIS)

    Rhee, We-Beg

    2000-01-01

    Korea has dynamic nuclear power expansion programs, operating 16 nuclear units producing 13710 MW in total located on 4 different sites. Last year, nuclear power supplied over 40 % of national total electricity demands. In 1998, Korean government initiated re-designation work investigating circumstance changes to rule out the unnecessary sites in consideration of a long-term power supply. Korean government has determined to expand the Ulchin site and to designate one point of Woolju county as a new candidate site, and ruled out the rest candidate sites at the end of 1998. About such a governmental measure, the two areas show different reactions. Ulchin where nuclear power plant has been operated safely for about 10 years was likely to accept the governmental determination in spite of some opposition and called for several financial supports for local development. WooIju county, however, showed a strong opposition among local environmental groups and autonomous politicians, and they presented a variety of anti-nuclear activities including demonstrations mainly at the neighbouring metropolis, Ulsan city

  18. G. Nuclear power plant siting

    International Nuclear Information System (INIS)

    1976-01-01

    The selection of a site for a nuclear power site is a complex process involving considerations of public health and safety, engineering design, economics, and environmental impact. Although policies adopted in various countries differ in some details, a common philosophy usually underlies the criteria employed. The author discusses the basic requirements, as they relate to New Zealand, under the headings: engineering and economics; health and safety; environmental factors

  19. Nuclear power plant siting: Hydrogeologic aspects

    International Nuclear Information System (INIS)

    1984-01-01

    This Safety Guide gives guidelines and methods for determining the ground water concentration of radionuclides that could result from postulated releases from nuclear power plants. The Guide gives recommendations on the data to be collected and the investigations to be performed at various stages of nuclear power plant siting in relation to the various aspects of the movement of accidentally released radioactive material through the ground water, the selection of an appropriate mathematical or physical model for the hydrodynamic dispersion even two-phase distribution of the radioactive material and an appropriate monitoring programme

  20. War protected underground siting of nuclear power plants -a summary

    International Nuclear Information System (INIS)

    1974-06-01

    In connection with studies concerning the need of war protected nuclear power production the technical and economical conditions with war protection of nuclear power plants have been studied within CDL. Comprehensively one have shown that no technical construction obstacles for siting a nuclear power plant underground exist that the additional costs for underground siting with price level mid 1973 are some 175-250 MSwCr (In today's price level 250 MSwCr will probably correspond to some 300 MSwCr per unit) and that the construction time is some one year longer than for an above ground plant. A study ought to examine more closely the consequences of underground siting from a radiological point of view and what demands on that occasion ought to be put on the technical design. (author)

  1. Site and feasibility studies of a first nuclear power plant in Morocco

    International Nuclear Information System (INIS)

    Righi, M.

    1988-11-01

    Basing on the estimated studies related to the evaluation of future needs of electrical energy, the launching of a nuclear power program in Morocco is confirmed necessary. A complete study of sites and feasibility has been carried out. Taking into account the site selection factors two sites: BIR ELHAR and SIDI BOULBRA have been kept as candidate sites. The evaluation of seismic and geotechnical risks of the power plant impact on the environment and risks related to human activities has led to privilege the SIDI BOULBRA site. The studies for confirming this site are summarized. 4 figs. (F.M.)

  2. The problem of nuclear power plants site survey and selection

    International Nuclear Information System (INIS)

    Anh, T.H.; Hung, H.V.; Bui Quoc Thang

    1986-01-01

    The article presents the main steps of nuclear power plants siting, including the requirements from a nuclear power station onto the site, and the analysis of potential effects of a nuclear power station to the environment. Attentions are called upon the analysis of important factors such as electric transmission losses, cooling water supply, site accessibility, local infrastructure, risks due to man made and natural sources of aggression to the nuclear power plants, population, distribution, hydrological and atmospheric dispersion conditions

  3. Valuation procedure for supra-regional siting of nuclear power plants

    International Nuclear Information System (INIS)

    Volwahsen, A.

    1977-01-01

    The entwinement of area planning and power policies is explained and conceivable effects of the selection of site for nuclear power stations on the regional economic and social structure as well as the housing development are discussed. A research project and its purposes are presented here, the project having been initiated in order to examine the siting concepts emerging from the discussion of deverging interests, and in order to elaborate a variety of concrete requirements to be made with regard to site examination and site selection. Large-scole valuation indicators and procedures are expected to lead to solutions acceptable for all parties concerned. (HP) 891 HP [de

  4. Design, Construction and Operation of a Molten Carbonate Fuel Cell (MCFC) in the 100-kW-Class

    International Nuclear Information System (INIS)

    Heiming, Andreas; Huppmann, Gerhard; Aasberg-Petersen, Kim

    1999-01-01

    In fuel cells, the electrochemical energy of the fuel is converted directly into electricity and heat. The electrochemical conversion is inherently related to high electrical efficiencies and very low pollutant emissions. Fuel cells with sufficiently high operating temperatures such as (1) the phosphoric acid fuel cell (PAFC), operating temperature: 200 o C, (2) the molten carbonate fuel cell (MCFC), operating temperature: 650 o C and (3) the solid oxide fuel cell (SOFC), operating temperature: around 900 o C are best suited for decentralised combined heat and power (CHP) applications. This is due to the fact, that the heat of the exothermic reaction taking place in the fuel cell can be used in the domestic, commercial and industrial sector for heating and hot water or steam production. At the present time, gas-engines or gas-turbines are the preferred CHP-technologies for these applications. Nowadays, the PAFC is commercially available. More than 160 plants, each with a power of 200 kW, have been installed world-wide. Ruhrgas has investigated the behaviour of a 200 kW PAFC at its research centre in Dorsten, Germany, and at the site of a local utility. High temperature fuel cells such as MCFC or SOFC promise electrical efficiencies above 50 % in simple cycle mode. Up to now, MCFC-test plants have been built and operated in the 100 kW to 1 MW power range. The largest MCFC ever operated consisted of 16 identical stacks of 125 kW each, resulting in a plant power of 2 MW. The initial experience with SOFC in this power-range is currently gained from the operation of a 100 kW plant. In this paper, the result of the construction and operation of a highly innovatively designed 280 kW MCFC will be presented. This plant has been designed, built and operated by a European consortium for the development and market introduction of the MCFC. Members of the consortium are MTU-Friedrichshafen GmbH, Haldor Topsoee NS, Elkraft A.m.b.H., RWE Energie AG and Ruhrgas AG. (author)

  5. [Effect of polymeric aluminum-iron on EPS and bio-flocculation in A2/O system].

    Science.gov (United States)

    Wen, Qin-Xue; Liu, Ai-Cui; Chen, Zhi-Qiang; Shi, Han-Chang; Lü, Bing-Nan

    2012-04-01

    Polymeric aluminum-iron (PAFC) was added at the end of aeration tank to enhance phosphorus removal, so that the phosphorus concentration in the effluent could meet the calss A standard in municipal sewage treatment plant pollutant discharge standard (GB 18918-2002). The characteristics of extracellular polymer substances (EPS) and bio-flocculation for the activated sludge in the A2/O system were analyzed in the experiment. The results showed that, the gross of EPS varied little with the increase in PAFC dosage, while, the ratio of albumen to polysaccharide declined from 3.30 to 2.30. When the PAFC dosage increased, the concentration of Al3+ in EPS increased during the whole anaerobic-anoxic-aerobic cycle. The flocs of activated sludge became larger after PAFC addition, Zeta potential of the effluent dropped significantly from - 15.83 mV to -21.20 mV and sludge yield increased. Therefore, bio-flocculation of the activated sludge in the A2/O system improved when a proper amount of PAFC was added, subsequently improve the water quality of the effluent.

  6. Underground siting of nuclear power plants

    International Nuclear Information System (INIS)

    Bender, F.

    1982-01-01

    The symposium gave the opportunity for an international exchange of views on the concepts of underground nuclear power plants, which are presently world wide under consideration. The results of investigations into the advantages and disadvantages with regard to the technical safety aspects of the underground plants in comparison to plants on the surface led to open and sometimes controversal discussions. As a result of the symposium (32 contributions) a general agreement can be stated on the judgement concerning the advantages and the disadvantages of underground nuclear power plants (nnp). The advantages are: increased protection against external events; delayed release of fission products in accident situations, if the closures operate properly. The disadvantages are: increased costs of the construction of underground and restrictions to such sites where either large caverns or deep pits can be constructed, which also requires that certain technical problems must be solved beforehand. Also, additional safety certificates related to the site will be required within the licensing procedures. The importance of these advantages and disadvantages was in some cases assessed very differently. The discussions also showed, that there are a number of topics where some questions have not been finally answered yet. (orig./HP) [de

  7. Dose assessments in nuclear power plant siting

    International Nuclear Information System (INIS)

    1988-03-01

    This document is mainly intended to provide information on dose estimations and assessments for the purpose of nuclear power plant (NPP) siting. It is not aimed at giving radiation protection guidance, criteria or procedures to be applied during the process of NPP siting nor even to provide recommendations on this subject matter. The document may however be of help for implementing some of the Nuclear Safety Standards (NUSS) documents on siting. The document was prepared before April 26, 1986, when a severe accident at the Unit 4 of Chernobyl NPP in the USSR had occurred. It should be emphasized that this document does not bridge the gap which exists in the NUSS programme as far as radiation protection guidance for the specific case of siting of NPP is concerned. The Agency will continue to work on this subject with the aim to prepare a safety series document on radiation protection requirements for NPP siting. This document could serve as a working document for this purpose. Refs, figs and tabs

  8. Method for assigning sites to projected generic nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Holter, G.M.; Purcell, W.L.; Shutz, M.E.; Young, J.R.

    1986-07-01

    Pacific Northwest Laboratory developed a method for forecasting potential locations and startup sequences of nuclear power plants that will be required in the future but have not yet been specifically identified by electric utilities. Use of the method results in numerical ratings for potential nuclear power plant sites located in each of the 10 federal energy regions. The rating for each potential site is obtained from numerical factors assigned to each of 5 primary siting characteristics: (1) cooling water availability, (2) site land area, (3) power transmission land area, (4) proximity to metropolitan areas, and (5) utility plans for the site. The sequence of plant startups in each federal energy region is obtained by use of the numerical ratings and the forecasts of generic nuclear power plant startups obtained from the EIA Middle Case electricity forecast. Sites are assigned to generic plants in chronological order according to startup date.

  9. Method for assigning sites to projected generic nuclear power plants

    International Nuclear Information System (INIS)

    Holter, G.M.; Purcell, W.L.; Shutz, M.E.; Young, J.R.

    1986-07-01

    Pacific Northwest Laboratory developed a method for forecasting potential locations and startup sequences of nuclear power plants that will be required in the future but have not yet been specifically identified by electric utilities. Use of the method results in numerical ratings for potential nuclear power plant sites located in each of the 10 federal energy regions. The rating for each potential site is obtained from numerical factors assigned to each of 5 primary siting characteristics: (1) cooling water availability, (2) site land area, (3) power transmission land area, (4) proximity to metropolitan areas, and (5) utility plans for the site. The sequence of plant startups in each federal energy region is obtained by use of the numerical ratings and the forecasts of generic nuclear power plant startups obtained from the EIA Middle Case electricity forecast. Sites are assigned to generic plants in chronological order according to startup date

  10. Model calculations of the influence of population distribution on the siting of nuclear power plants

    International Nuclear Information System (INIS)

    Nielsen, F.; Walmod-Larsen, O.

    1984-02-01

    This report was prepared for a working group established in April 1981 by the Danish Environmental Protection Agency with the task of investigating siting problems of nuclear power stations in Denmark. The purpose of the working group was to study the influence of the population density around a site on nuclear power safety. The importance of emergency planning should be studied as well. In this model study two specific accident sequences were simulated on a 1000 MWe nuclear power plant. The plant was assumed to be placed in the center of two different model population distributions. The concequences for the two population distributions from the two accidents were calculated for the most frequent weather conditions. Doses to individuals were calculated for the bone marrow, lungs, gastrointestinal tract, thyroidea and for the whole body. The collective whole body doses were also calculated for the two populations considered. (author)

  11. American National Standard: guidelines for evaluating site-related geotechnical parameters at nuclear power sites

    International Nuclear Information System (INIS)

    Anon.

    1978-01-01

    This standard presents guidelines for evaluating site-related geotechnical parameters for nuclear power sites. Aspects considered include geology, ground water, foundation engineering, and earthwork engineering. These guidelines identify the basic geotechnical parameters to be considered in site evaluation, and in the design, construction, and performance of foundations and earthwork aspects for nuclear power plants. Also included are tabulations of typical field and laboratory investigative methods useful in identifying geotechnical parameters. Those areas where interrelationships with other standards may exist are indicated

  12. Rock siting of nuclear power plants from a reactor safety standpoint

    International Nuclear Information System (INIS)

    1975-11-01

    The study has aimed at surveying the advantages and disadvantages of a rock sited nuclear power plant from a reactor safety standpoint. The studies performed are almost entirely concentrated on the BWR alternative. The design of a nuclear power plant in rock judged most appropriate has been studied in greater detail, and a relatively extensive safety analysis has been made. It is found that the presented technical design of the rock sited alternative is sufficiently advanced to form a basis for further projecting treatment. The chosen technical design of the reactor plant demands a cavern with a 45-50 metre span. Caverns without strengthening efforts with such spans are used in mines, but have no previously been used for industrial plants. Studies of the stability of such caverns show that a safety level is attainable corresponding to the safety required for the other parts of the nuclear power plant. The conditions are that the rock is of high quality, that necessary strengthening measures are taken and that careful studies of the rock are made before and during the blasting, and also during operation of the plant. When locating a rock sited nuclear power plant, the same criteria must be considered as for an above ground plant, with additional stronger demands for rock quality. The presented rock sited nuclear power plant has been assessed to cost 20 % more in total construction costs than a corresponding above ground plant. The motivations for rock siting also depend on whether a condensing plant for only electricity production, or a plant for combined power production and district heating, is considered. The latter would under certain circumstances make rock siting look more attractive. (author)

  13. Legal consequences of the special development plan 'power plant sites' on regional planning and on guidelines for building plans

    International Nuclear Information System (INIS)

    1978-01-01

    The Special Development Plan 'Power plant sites' was made compulsory by the regulation given by the Land government in Juli 1976. For extending the energy supply system this Special Development Plan intends to provide a sufficient amount of power plant sites suitably located with regard to present and future consumption centres and permitting a cooling by means of river water while safeguarding the interests of water resources policy. The Special Development Plan established in accordance with the articles 25 and 27 of the planning law of the Land lays down that 14 specified areas are to be kept free from utilization purposes which could be opposed to the realization of power plant projects. Thus the securing of these (potential) sites has become an objective of area planning and planning of the Land in the sense of article 5 paragraph 4 of the Federal law on area planning. (orig./HP) [de

  14. Regional approaches to power plant siting in the United States of America

    International Nuclear Information System (INIS)

    DiNunno, J.J.

    1975-01-01

    The selection and evaluation of sites for power plants in the United States of America have become increasingly difficult in recent years as pressures from various societal segments have resulted in governmental restraints on selection and burning of fossil fuels, methods of heat dissipation, acquisition of transmission rights of way, and on environmental impact of industrialization in general. New legislation at both Federal and state levels has been enacted that influences power plant siting. In addition to environmental requirements that must be satisfied, implementing procedures require documented justification for sites chosen and public disclosure of the basis for selection. Some states have consolidated their regulatory activities in the power plant siting area to provide for a more unified approach to these problems. Although nuclear plants have by far the most rigorous requirements for documentation of site selection and plant design, the application of the same general philosophies to fossil plants has been made in several states and can be anticipated elsewhere. Individual site-related investigations have not so much changed in basics as they have been enlarged in scope. Whereas in the past the search for siting alternatives was frequently confined to a utility's service area, the additional siting constraints represented in environmental laws, the economies of size of nuclear power plants, and the sharing of plant capacities among utilities have contributed to a widening of the search area. Several states have assumed the responsibility for site search and investigation and their efforts extend state-wide. This paper discusses applications of regional approaches to power plant siting in the United States of America using case studies made by NUS Corporation, an engineering/environmental consulting firm. The universality of these approaches is indicated, leaving to national policies and goals the importance of values assigned to the basic siting factors

  15. Preliminary results on food consumption rates for off-site dose calculation of nuclear power plants

    International Nuclear Information System (INIS)

    Lee, Gab Bock; Chung, Yang Geun; Bang, Sun Young; Kang, Duk Won

    2005-01-01

    The Internal dose by food consumption mostly account for radiological dose of public around nuclear power plants(NPP). But, food consumption rate applied to off-site dose calculation in Korea which is the result of field investigation around Kori NPP by the KAERI in 1988. is not reflected of the latest dietary characteristics. The Ministry of Health and Welfare Affairs has investigated the food and nutrition of nations every 3 years based on the Law of National Health Improvement. To update the food consumption rates of the maximum individual, the analysis of the national food investigation results and field surveys around nuclear power plant sites have been carried out

  16. Status and prospects of fuel cell technology in Europe

    International Nuclear Information System (INIS)

    Van Dijkum

    1998-01-01

    Fuel Cells attract a lot of press attention today and an some example of a recent press heading is: ''Orders for Onsi's fuel cells hit $111 million''. The principle of fuel cell technology is explained and examples of realized applications given. In short: fuel cells can be used everywhere where power (and heat) is needed. Regarding the status of fuel cells, Europe is way behind Japan and the US. The 15 PAFC-200 kWe units in operation in Europe (worldwide > 90 units) produced 46,796 MWhe during 296,704 cumulative operating hours with an availability % over 70.00. The world record on continuous operation is held by Japan with 9,478 hours reached at 14th September 1996 and two PAFC-units passed their 40,000 hours of cumulative operation (US and Japan). In Japan, market enabling support is continued with subsidies of one third of the costs for 7 PAFC-units. In the Netherlands, Energy Distribution Companies test their tubular 100 kWe SOFC-unit. During 1,335 hours of continuous operation, the unit produced 165 MWhe in total at 3rd March. EnergieNed, CLC/Ansaldo and Gastec evaluated changes for co-generation and small power production with packaged fuel cell power plants in EU and EFTA countries. In general the authors concluded that implementation of fuel cell power plants in all EU and EFTA countries will be probably possible with today' s technical regulations. On might wonder: What has fuel cell technology to offer in one of the most efficient and low-priced gas economies in Europe, the Netherlands. An example of efficient energy use are greenhouses with artificial lighting and CO 2 -fertilization and energy (heat) storage device. Applying relatively favorable depreciation periods and (utility) interest rate, a PAFC 200 kWe generates just a positive return (IRR = 1.7 % after taxes and subsidies) when part of a gas-engine capacity is replaced

  17. Avian radioecology on a nuclear power station site. Final report

    International Nuclear Information System (INIS)

    Levy, C.K.; Maletskos, C.J.; Youngstrom, K.A.

    1975-01-01

    A summary of a six-year avian radioecology study at the site of a nuclear power plant in Massachusetts is reported. A completed historical summary is followed by a description of mathematical models developed to calculate the effects on bird body burdens of various changes in environmental radionuclide levels. Examples are presented. Radionuclide metabolism studies in which acute doses of 131 I and 137 Cs were administered to four species of wild birds are presented. Radionuclides were administered both intravenously and orally; no apparent differences in uptake or elimination rates were observed between the two methods

  18. Avian radioecology on a nuclear power station site. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Levy, C.K.; Maletskos, C.J.; Youngstrom, K.A.

    1975-01-01

    A summary of a six-year avian radioecology study at the site of a nuclear power plant in Massachusetts is reported. A completed historical summary is followed by a description of mathematical models developed to calculate the effects on bird body burdens of various changes in environmental radionuclide levels. Examples are presented. Radionuclide metabolism studies in which acute doses of /sup 131/I and /sup 137/Cs were administered to four species of wild birds are presented. Radionuclides were administered both intravenously and orally; no apparent differences in uptake or elimination rates were observed between the two methods.

  19. On site selection of thermoelectric power plants in polluted environment

    International Nuclear Information System (INIS)

    Gheorghe, A.V.

    1992-01-01

    This paper discusses the environmental impact of combined heat-power plants. The selection of the site of these plants depends on the spatial distribution law of pollutants and their chemical interaction with environment. The solutions of a diffusion equation describing a system of chemically interacting pollutants are given and discussed. The environmental impacts are described in terms of wind and atmosphere stability, effective and built stack height and the source distance parameters. The optimal constructive solutions are judged upon the concentrations of sulfur and nitrogen oxides at the ground level which must be kept under the maximum admissible limit. (author). 8 figs

  20. Operating experience relating to on-site electric power sources. Proceedings of a Specialist Meeting

    International Nuclear Information System (INIS)

    1986-02-01

    The reliability of on-site electric power sources of nuclear power plants usually consisting of diesel generators, gas turbine generators and DC power sources, has been a matter of concern during reactor operations. The frequent recurrence and the important consequences of failures relating to on-site electric power sources have led to a general consensus that they form one of the most significant features influencing the total performance of the safety Systems. This has also been confirmed by surveys performed on the incidents reported through the NEA Incident Reporting System (IRS). Accordingly, a recommendation to organise a Specialist Meeting on the subject was made at the third annual meeting of CSNI Principal Working Group No. 1 (Operating Experience and Human Factors). At the 12. meeting of the CSNI held in November 1984. the Committee endorsed the proposal and accepted an offer by the United Kingdom to host and organise the Specialist Meeting. The Specialist Meeting, sponsored by the CSNI, was held in London, United Kingdom from 16 to 18 October 1985. It was hosted by H.M. Nuclear Installations Inspectorate of the Health and Safety Executive. The purpose of the meeting was to promote the exchange of Information on operating experience relating to on-site electric power sources and to look for measures to further improve their reliability In the areas of design, operation and licensing. The meeting was organised by a Programme Group which included nominated members of CSNI PWG No. 1. the Programme Group met in May and June 1985 in Paris to agree on the programme and practical arrangements for the meeting. As a result of the review of the abstracts which had been contributed in response to the Call for Papers, 28 papers were accepted for presentation during the meeting. Approximately 60 delegates from 13 Member countries, and the NEA Secretariat, attended the meeting. Session summaries prepared by the respective session chairmen are Included prior to the

  1. Operating experience relating to on-site electric power sources. Proceedings of a Specialist Meeting

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1986-02-15

    The reliability of on-site electric power sources of nuclear power plants usually consisting of diesel generators, gas turbine generators and DC power sources, has been a matter of concern during reactor operations. The frequent recurrence and the important consequences of failures relating to on-site electric power sources have led to a general consensus that they form one of the most significant features influencing the total performance of the safety Systems. This has also been confirmed by surveys performed on the incidents reported through the NEA Incident Reporting System (IRS). Accordingly, a recommendation to organise a Specialist Meeting on the subject was made at the third annual meeting of CSNI Principal Working Group No. 1 (Operating Experience and Human Factors). At the 12. meeting of the CSNI held in November 1984. the Committee endorsed the proposal and accepted an offer by the United Kingdom to host and organise the Specialist Meeting. The Specialist Meeting, sponsored by the CSNI, was held in London, United Kingdom from 16 to 18 October 1985. It was hosted by H.M. Nuclear Installations Inspectorate of the Health and Safety Executive. The purpose of the meeting was to promote the exchange of Information on operating experience relating to on-site electric power sources and to look for measures to further improve their reliability In the areas of design, operation and licensing. The meeting was organised by a Programme Group which included nominated members of CSNI PWG No. 1. the Programme Group met in May and June 1985 in Paris to agree on the programme and practical arrangements for the meeting. As a result of the review of the abstracts which had been contributed in response to the Call for Papers, 28 papers were accepted for presentation during the meeting. Approximately 60 delegates from 13 Member countries, and the NEA Secretariat, attended the meeting. Session summaries prepared by the respective session chairmen are Included prior to the

  2. Regulatory requirements for nuclear power plant site selection in Malaysia-a review.

    Science.gov (United States)

    Basri, N A; Hashim, S; Ramli, A T; Bradley, D A; Hamzah, K

    2016-12-01

    Malaysia has initiated a range of pre-project activities in preparation for its planned nuclear power programme. Clearly one of the first steps is the selection of sites that are deemed suitable for the construction and operation of a nuclear power plant. Here we outline the Malaysian regulatory requirements for nuclear power plant site selection, emphasizing details of the selection procedures and site characteristics needed, with a clear focus on radiation safety and radiation protection in respect of the site surroundings. The Malaysia Atomic Energy Licensing Board (AELB) site selection guidelines are in accord with those provided in International Atomic Energy Agency (IAEA) and United Stated Nuclear Regulatory Commission (USNRC) documents. To enhance the suitability criteria during selection, as well as to assist in the final decision making process, possible assessments using the site selection characteristics and information are proposed.

  3. Siting technology of underground nuclear power station

    International Nuclear Information System (INIS)

    Motojima, M.; Hibino, S.

    1989-01-01

    For the site of a nuclear power station, it may be possible to select a seaside mountain area, if the condition is suitable to excavate large rock caverns in which a reactor and other equipments are installed. As the case study on the siting technology for an underground nuclear power station, the following example was investigated. The site is a seaside steep mountain area, and almost all the equipments are installed in plural tunnel type caverns. The depth from the ground surface to the top of the reactor cavern is about 150 m, and the thickness of the rock pillar between the reactor cavern of 33 m W x 82 mH x 79 mD and the neighboring turbine cavern is 60 m. In this paper, the stability of rock caverns in this example, evaluated by numerical analysis, is described. The numerical analysis was carried out on the central cross section of the reactor cavern, taking the turbine cavern, geostress, the mechanical properties of rock mass and the process of excavation works in consideration. By the analysis, the underground caverns in this example were evaluated as stable, if the rock quality is equivalent to C H class or better according to the CRIEPI rock classification. (K.I.)

  4. Review of underground siting of nuclear power plants

    International Nuclear Information System (INIS)

    1974-01-01

    A review of the potential for the underground siting of nuclear power generating plants has been undertaken. The review comprised a survey and assessment of relevant published documents currently available, together with discussions with Government sponsored agencies and other bodies, to evaluate the current status of technology related to the design and construction of underground nuclear power plants. It includes a review of previous work related to the underground siting of power plants and other facilities; a preliminary evaluation of the relative merits of the various concepts of undergrounding which have been proposed or constructed; a review of current technology as it relates to the requirements for the design, construction and operation of underground nuclear power plants; an examination of the safety and environmental aspects; and the identification of areas of further study which will be required if the underground is to be established as a fully viable alternative to surface siting. No attempt has been made to draw final conclusions at this stage. Nothing has been found to suggest that the underground siting concept could not provide a viable alternative to the surface concept. It is also apparent that no major technological developments are required. It is not clear, however, whether the improvements in safety and containment postulated for the underground can be realized at an economic cost; or even whether any additional cost is in fact involved. The problem is essentially site dependent and requires further study for which recommendations are made. (auth)

  5. Problems in Siting Nuclear Power Plants in Japan and Efforts to Solve Them

    Energy Technology Data Exchange (ETDEWEB)

    Inouye, T. [Ministry of International Trade and Industry, Tokyo (Japan)

    1967-09-15

    The rapidly growing demand for energy in Japan will require a total capacity of 30 to 40 thousand MW(e) in nuclear power by 1985. Materialization of this development programme must naturally be supported by securing the requisite sites for the nuclear power plants. The following factors make siting of nuclear power plants more difficult in Japan than in any other country: a small, densely populated territory with little level land, that is already completely utilized for agricultural and/or industrial purposes; small rivers and an active marine-product industry developed along most of the seacoasts, both of which create difficult cooling-water problems; frequent earthquakes; and the fear of possible radioactivity, which prevails in the only nation in the world to have suffered from the atomic bomb. There are at present four nuclear power plants in operation or under construction in Japan with a total capacity of about 1.3 thousand MW(e). However, the plants in these construction programmes have been sited on the basis of taking the easiest course available although there were several possible solutions to choose from. It is pointed out here that the long-range nuclear power development programme will call for a fundamental solution to enable siting a large number of power plants under the adverse conditions in Japan. Accordingly, a study was made, which included quantitative analyses of reactor siting factors and suggested measures for solving the siting problems. The analyses were based on nuclear power plant sites assumed to be located on the seacoast and characterized by low-population density, desirable geology and favourable topography. It was assumed that seacoast siting was more economical than inland siting. Although the study was made by a general survey using maps, it was shown that approximately 10% of the total coastline areas would be eligible for reactor siting, but most of these areas in this case are located in the northern part of Japan, far from

  6. Meteorological events in site evaluation for nuclear power plants. Safety guide

    International Nuclear Information System (INIS)

    2005-01-01

    This Safety Guide provides recommendations and guidance on conducting hazard assessments of extreme and rare meteorological phenomena. It is of interest to safety assessors and regulators involved in the licensing process as well as to designers of nuclear power plants. This Safety Guide was prepared under the IAEA programme for safety standards for nuclear power plants. It supplements the IAEA Safety Requirements publication on Site Evaluation for Nuclear Facilities which is to supersede the Code on the Safety of Nuclear Power Plants: Siting, Safety Series No. 50-C-S (Rev. 1), IAEA, Vienna (1988). The present Safety Guide supersedes two earlier Safety Guides: Safety Series No. 50-SG-S11A (1981) on Extreme Meteorological Events in Nuclear Power Plant Siting, Excluding Tropical Cyclones and Safety Series No. 50-SG-S11B (1984) on Design Basis Tropical Cyclone for Nuclear Power Plants. The purpose of this Safety Guide is to provide recommendations and guidance on conducting hazard assessments of extreme and rare meteorological phenomena. This Safety Guide provides interpretation of the Safety Requirements publication on Site Evaluation for Nuclear Facilities and guidance on how to fulfil these requirements. It is aimed at safety assessors or regulators involved in the licensing process as well as designers of nuclear power plants, and provides them with guidance on the methods and procedures for analyses that support the assessment of the hazards associated with extreme and rare meteorological events. This Safety Guide discusses the extreme values of meteorological variables and rare meteorological phenomena, as well as their rates of occurrence, according to the following definitions: (a) Extreme values of meteorological variables such as air temperature and wind speed characterize the meteorological or climatological environment. And (b) Rare meteorological phenomena

  7. The potential environmental impacts and the siting of proposed nuclear power plants in China

    International Nuclear Information System (INIS)

    Shi Zhongqi

    1986-01-01

    This paper reviews briefly the methodology of assessing environmental impacts from the nuclear power plants and analyses the potential radiological impacts on the environment from proposed nuclear power plants in China. Preliminary studies show that the environmental impacts of the effluents of routine release from PWRs to the proposed sites are extremely small, even if nuclear power plants are constructed either on the Bohai Sea shore with a narrow mouth or in the densely populated regions of Sunan. Thus, the suitability of sites depends mainly on the acceptability of possible exposure to the residents following postulated accidental release of radioactive materials. The paper also discusses relations between the nuclear plant siting and population distribution around the site and compares the distribution of the proposed sites in China with that of other countries sites in according to China actual situation, it is reasonable to adopt a prudent policy that the first series of nuclear power plants in China should be built in relatively low population areas

  8. Replacement Power Facility site selection report

    Energy Technology Data Exchange (ETDEWEB)

    Wike, L.D.; Toole, G.L.; Specht, W.L.

    1992-06-01

    The Department of Energy (DOE) has proposed the construction and operation of a Replacement Power Facility (RPF) for supplementing and replacing existing sources of steam and possibly electricity at the Savannah River Site (SRS). DOE is preparing an Environmental Impact Statement (EIS) for this project As part of the impact analysis of the proposed action, the EIS will include a detailed description of the environment where the RPF will be constructed. This description must be specific to the recommended site at SRS, which contains more than 300 square miles of land including streams, lakes, impoundments, wetlands, and upland areas. A formal site-selection process was designed and implemented to identify the preferred RPF site.

  9. Geological and geotechnical investigations for nuclear power plants sites

    International Nuclear Information System (INIS)

    Alves, P.R.R.

    1984-09-01

    This dissertation presents a general methodology for the tasks of geological and geotechnical investigations, to be performed in the proposed sites for construction of nuclear Power Plants. In this work, items dealing with the standards applied to licensing of Nuclear Power Plants, with the selection process of sites and identification of geological and geotechnical parameters needed for the regional and local characterization of the area being studied, were incorporated. This dissertation also provides an aid to the writing of Technical Reports, which are part of the documentation an owner of a Nuclear Power Plant needs to submit to the Comissao Nacional de Energia Nuclear, to fulfill the nuclear installation licensing requirements. Moreover, this work can contribute to the planning of field and laboratory studies, needed to determine the parameters of the area under investigation, for the siting of Nuclear Power Plants. (Author) [pt

  10. Safety criteria for siting a nuclear power plant

    International Nuclear Information System (INIS)

    2001-01-01

    The guide sets forth requirements for safety of the population and the environment in nuclear power plant siting. It also sets out the general basis for procedures employed by other competent authorities when they issue regulations or grant licences. On request STUK (Radiation and Nuclear Safety Authority of Finland) issues case-specific statements about matters relating to planning and about other matters relating to land use in the environment of nuclear power plants

  11. Environmental impact statement on the siting of nuclear power plants: scoping summary report

    International Nuclear Information System (INIS)

    1981-12-01

    The NRC staff has completed its scoping process for the Environmental Impact Statement for the revision of its regulations on the siting of nuclear power plants. The rulemaking and environmental review have been focused to concentrate on significant issues and alternatives and to delete items from the rulemaking on which it is not appropriate to proceed at this time. A brief discussion of the major comments is included

  12. Power sites win on teamwork

    International Nuclear Information System (INIS)

    Montague, S.

    1985-01-01

    On time and on budget are claims too rarely made of nuclear power station construction projects. But the civils work at Heysham 2 and Torness is almost over and has run close to programme all the way. The design and construction of Britain's latest advanced gas cooled reactors is discussed. (author)

  13. Siting and early-stage project management of nuclear power plant

    International Nuclear Information System (INIS)

    Wang Kai; Li Guojin

    2013-01-01

    In this paper, difficulties and challenges facing in siting of nuclear power plant after Fukushima nuclear accident is introduced. The key points for siting are analyzed. The site characteristics related to nuclear safety and the evaluated methods are discussed. From project management perspective, main procedures and key points for the early-stage of a nuclear power project are described. (authors)

  14. Multi-site solar power forecasting using gradient boosted regression trees

    DEFF Research Database (Denmark)

    Persson, Caroline Stougård; Bacher, Peder; Shiga, Takahiro

    2017-01-01

    The challenges to optimally utilize weather dependent renewable energy sources call for powerful tools for forecasting. This paper presents a non-parametric machine learning approach used for multi-site prediction of solar power generation on a forecast horizon of one to six hours. Historical pow...

  15. Developing a Hierarchical Decision Model to Evaluate Nuclear Power Plant Alternative Siting Technologies

    Science.gov (United States)

    Lingga, Marwan Mossa

    A strong trend of returning to nuclear power is evident in different places in the world. Forty-five countries are planning to add nuclear power to their grids and more than 66 nuclear power plants are under construction. Nuclear power plants that generate electricity and steam need to improve safety to become more acceptable to governments and the public. One novel practical solution to increase nuclear power plants' safety factor is to build them away from urban areas, such as offshore or underground. To date, Land-Based siting is the dominant option for siting all commercial operational nuclear power plants. However, the literature reveals several options for building nuclear power plants in safer sitings than Land-Based sitings. The alternatives are several and each has advantages and disadvantages, and it is difficult to distinguish among them and choose the best for a specific project. In this research, we recall the old idea of using the alternatives of offshore and underground sitings for new nuclear power plants and propose a tool to help in choosing the best siting technology. This research involved the development of a decision model for evaluating several potential nuclear power plant siting technologies, both those that are currently available and future ones. The decision model was developed based on the Hierarchical Decision Modeling (HDM) methodology. The model considers five major dimensions, social, technical, economic, environmental, and political (STEEP), and their related criteria and sub-criteria. The model was designed and developed by the author, and its elements' validation and evaluation were done by a large number of experts in the field of nuclear energy. The decision model was applied in evaluating five potential siting technologies and ranked the Natural Island as the best in comparison to Land-Based, Floating Plant, Artificial Island, and Semi-Embedded plant.

  16. Quaternary ground siting technology of nuclear power plants

    International Nuclear Information System (INIS)

    Nishi, K.; Kokusho, T.; Iwatate, Y.; Ishida, K.; Honsho, S.; Okamoto, T.; Tohma, J.; Tanaka, Y.; Kanatani, M.

    1992-01-01

    A seismic stability evaluation method for a nuclear power plant to be located on Quaternary sandy/gravelly ground is discussed herein in terms of a geological and geotechnical survey, a design earthquake motion evaluation and geotechnical seismic stability analyses. The geological and geotechnical exploration tunnel in the rock foundation siting will be difficult in the Quaternary ground siting. Boring, geophysical surveys and soil sampling will play a major role in this case. A design earthquake input spectrum for this siting is proposed to take in account the significant effect of longer period motion on ground stability. Equivalent and non-linear analyses demonstrate the seismic stability of the foundation ground so long as the soil density is high. (author)

  17. Potential sites for tidal power in New Jersey.

    Science.gov (United States)

    2014-04-01

    High-resolution simulation is made to model tidal energy along the coastlines of New Jersey (NJ) and its neighbor states with an : unprecedentedly fine grid. On the basis of the simulation, a thorough search is made for sites for tidal power generati...

  18. ESPSD, Nuclear Power Plant Siting Database

    International Nuclear Information System (INIS)

    Slezak, S.

    2001-01-01

    1 - Description of program or function: This database is a repository of comprehensive licensing and technical reviews of siting regulatory processes and acceptance criteria for advanced light water reactor (ALWR) nuclear power plants. The program is designed to be used by applicants for an early site permit or combined construction permit/operating license (10CFRR522), Sub-parts A and C) as input for the development of the application. The database is a complete, menu-driven, self-contained package that can search and sort the supplied data by topic, keyword, or other input. The software is designed for operation on IBM compatible computers with DOS. 2 - Method of solution: The database is an R:BASE Runtime program with all the necessary database files included

  19. Comparison between dispersed nuclear power plants and a nuclear energy center at a hypothetical site on Kentucky Lake, Tennessee. Volume I. Summary

    International Nuclear Information System (INIS)

    Burwell, C.C.; Reister, D.B.; Rosemarin, C.S.; Sisman, O.; Suffern, J.S.

    1976-05-01

    A brief summary is presented of the surrogate site concept used to compare the Nuclear Energy Center (NEC) concept with the present method of dispersed siting of nuclear power plants. Included are data on power transmission, environmental considerations, and a discussion of a site selection methodology

  20. Multicriteria decision analysis based on analytic hierarchy process in GIS environment for siting nuclear power plant in Egypt

    International Nuclear Information System (INIS)

    Abudeif, A.M.; Abdel Moneim, A.A.; Farrag, A.F.

    2015-01-01

    Highlights: • The binary overlay method was used in Phase I through OR operator for selecting the candidate areas. • The WLC and AHP methods was used to screen and select the potential sites (phase II) in Arc GIS 10.1 software. • In phase III, four sites, all located on the North western coast and Red Sea, of highest scores were chosen as Candidate sites after eliminating the lowest score sites. • The AHP method was applied to select preferred candidate site and calculating the eigenvectors in Expert Choice Software Package. - Abstract: Due to increasing demand of electrical energy and freshwater in Egypt, it is safe to assume that the decision makers will turn to nuclear power as the feasible alternative for energy. However, as time goes by, fewer sites will be available and suitable for nuclear power plant development. Site selection is a key phase of the siting process of a nuclear plant and may significantly affect the safety and cost of the facility during its entire life cycle. The siting of nuclear power plants is one of multi-criteria problems, which makes it complex. Many interrelated factors affect the process. Six constraints and twenty-two factors corresponding to safety, environment and socio-economy were considered in the siting study presented in this paper. Multi-Criteria Decision Analysis was applied during the selection of nuclear power plants site using GIS software. Three spatial decision making models were applied in this paper during site selection stage. The binary overlay (Boolean logic) with Low Risk approach in which the logical OR operator is used to determine the candidate areas. All constraints were represented in binary maps, combined and a masking layer was created to eliminate the lands considered as constraints in Arc GIS Software. The 22 factors were represented in normalized maps after unifying all of them to 0–1 score scales based on the philosophy of suitability criteria (factors) using the Weighted Linear Combination

  1. 2014 annual site environmental report, Southwestern Power Administration

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2014-12-31

    Southwestern Power Administration’s Annual Site Environmental Report (ASER) serves as the chief reporting mechanism for site environmental performance information within the Department of Energy and as a valuable resource for shared and collaborative environmental protection and performance information to Agency stakeholders and members of the public living near Southwestern Power Administration’s (Southwestern) facilities and transmission line rights-of-ways. This ASER meets the requirements of Department of Energy (DOE) Order 231.B. Southwestern’s key environmental involvement includes an emphasis on the protection of ecological resources which is effectively accomplished through environmental program elements such as protecting water resources, generation of clean hydropower energy, oil spill prevention practices, elimination of green-house gas emissions, and comprehensive project reviews to ensure the protection of living organisms, migratory birds, Federally threatened or endangered species, and historic or cultural resources. Southwestern continues to actively minimize effects to natural resources and strive for continual improvement in the area of environmental compliance and sustainability while achieving the agency mission to market and deliver Federal hydroelectric power.

  2. Optimal Procedure for siting of Nuclear Power Plant

    International Nuclear Information System (INIS)

    Aziuddin, Khairiah Binti; Park, Seo Yeon; Roh, Myung Sub

    2013-01-01

    This study discusses on a simulation approach for sensitivity analysis of the weights of multi-criteria decision models. The simulation procedures can also be used to aid the actual decision process, particularly when the task is to select a subset of superior alternatives. This study is to identify the criteria or parameters which are sensitive to the weighting factor that can affect the results in the decision making process to determine the optimal site for nuclear power plant (NPP) site. To perform this study, we adhere to IAEA NS-R-3 and DS 433. The siting process for nuclear installation consists of site survey and site selection stages. The siting process generally consists of an investigation of a large region to select one or more candidate sites by surveying the sites. After comparing the ROI, two candidate sites are compared for final determination, which are Wolsong and Kori site. Some assumptions are taken into consideration due to limitations and constraints throughout performing this study. Sensitivity analysis of multi criteria decision models is performed in this study to determine the optimal site in the site selection stage. Logical Decisions software will be employed as a tool to perform this analysis. Logical Decisions software helps to formulate the preferences and then rank the alternatives. It provides clarification of the rankings and hence aids the decision makers on evaluating the alternatives, and finally draw a conclusion on the selection of the optimal site

  3. Optimal Procedure for siting of Nuclear Power Plant

    Energy Technology Data Exchange (ETDEWEB)

    Aziuddin, Khairiah Binti; Park, Seo Yeon; Roh, Myung Sub [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of)

    2013-10-15

    This study discusses on a simulation approach for sensitivity analysis of the weights of multi-criteria decision models. The simulation procedures can also be used to aid the actual decision process, particularly when the task is to select a subset of superior alternatives. This study is to identify the criteria or parameters which are sensitive to the weighting factor that can affect the results in the decision making process to determine the optimal site for nuclear power plant (NPP) site. To perform this study, we adhere to IAEA NS-R-3 and DS 433. The siting process for nuclear installation consists of site survey and site selection stages. The siting process generally consists of an investigation of a large region to select one or more candidate sites by surveying the sites. After comparing the ROI, two candidate sites are compared for final determination, which are Wolsong and Kori site. Some assumptions are taken into consideration due to limitations and constraints throughout performing this study. Sensitivity analysis of multi criteria decision models is performed in this study to determine the optimal site in the site selection stage. Logical Decisions software will be employed as a tool to perform this analysis. Logical Decisions software helps to formulate the preferences and then rank the alternatives. It provides clarification of the rankings and hence aids the decision makers on evaluating the alternatives, and finally draw a conclusion on the selection of the optimal site.

  4. Management of radioactive wastes at power reactor sites in India

    International Nuclear Information System (INIS)

    Amalraj, R.V.; Balu, K.

    Indian nuclear power programme, at the present stage, is based on natural uranium fuelled heavy water moderated CANDU type reactors except for the first nuclear power station consisting of two units of enriched uranium fuelled, light water moderated, BWR type of reactors. Some of the salient aspects of radioactive waste management at power reactor sites in India are discussed. Brief reviews are presented on treatment of wastes, their disposal and environmental aspects. Indian experience in power reactor waste management is also summarised identifying some of the areas needing further work. (auth.)

  5. PREMIUM ENERGY FOR LACTEC INSTITUTE FOR TECHNOLOGY DEVELOPMENT LACTEC R&D DPT. CURITIBA, STATE OF PARANA. BRAZIL

    Energy Technology Data Exchange (ETDEWEB)

    Silvio Vedovatto

    2003-12-31

    On April 2002 a 200KW Phosphoric Acid Fuel Cell (PAFC) Power Plant. was installed at LACTEC Institute For Technology Development, Research and Development facilities. The power plant installed at LACTEC site is the second of its kind in the Southern Hemisphere. Its presence, not only contributed to the creation of a Fuel Cell Stationary Power market for Brazil and the rest of the region, but increased the knowledge about fuel cell technology, and marked the point of entry as a reference for the education of a new generation of applied scientists. On its first year the power plant has operated 8,558 hours achieving an availability factor of 97% and supplying 730.50MWh of premium energy. As a second regional experience with fuel cell technology, we expect this report about LACTEC PACFC power plant performance, applications and cost-benefit evaluation will provide relevant information for future regional investments on this technology.

  6. Site infrastructure as required during the construction and erection of nuclear power plants

    International Nuclear Information System (INIS)

    Haas, K.F.; Wagner, H.

    1978-01-01

    In general, in an exchange of experience on constructing nuclear power plants priority is given to design and lay-out, financing, quality assurance etc., but in this paper an attempt has been made to describe range and type of site infrastructure required during construction and erection. Site infrastructure will make considerable demands on the planning, supply of material and maintenance that may result from the frequently very isolated location of power plant sites. Examples for specific values and experiences are given for a nuclear power plant with two units on the 1300-MW type at present under construction of the Persian Gulf in Iran. Data concerning the site infrastructure, including examples, are given and explained on the basis of graphs. The site is split up into a technical and a social infrastructure. The main concern of the technical site infrastructure is the timely provision and continuous availability of electric energy, water, communication grids, workshops, warehouses, offices, transport and handling facilities, as well as the provision of heavy load roads, harbour facilities, etc. The social site infrastructure in general comprises accommodation, food supplies and the care and welfare of all site personnel, which includes a hospital, school, self-service shop, and sport and recreation facilities. (author)

  7. Comparison between dispersed nuclear power plants and a nuclear energy center at a hypothetical site on Kentucky Lake, Tennessee. Volume II. Transmission of power

    International Nuclear Information System (INIS)

    Reister, D.B.; Zelby, L.W.

    1976-05-01

    A comparison is made among power transmission systems required to serve a single set of load center demands from four modes of siting the generating facilities: a single generation site with an ultimate generation capacity of 48,000 MW; four generation sites each with a generation capacity of 12,000 MW; 10 generation sites each with a generation capacity of 4,800 MW; and a system that resulted when the existing utility plan for future generation was logically expanded. The time period for the study is from the year 1985 to the year 2020, when the full 48,000 MW of new capacity from the single large nuclear energy center is on-line. The load centers served are Huntsville, Alabama; Evansville, Indiana; Paducah, Kentucky; and Chattanooga, Nashville, and Memphis, Tennessee. Generation sites are real locations but are hypothetical in terms of miles of transmission lines, the product of the amount of power transmitted and the distance transmitted (GW-miles), and cost

  8. Demographic statistics pertaining to nuclear power reactor sites

    International Nuclear Information System (INIS)

    1979-10-01

    Population statistics are presented for 145 nuclear power plant sites. Summary tables and figures are included that were developed to aid in the evaluation of trends and general patterns associated with the various parameters of interest, such as the proximity of nuclear plant sites to centers of population. The primary reason for publishing this information at this time is to provide a factual basis for use in discussions on the subject of reactor siting policy. The report is a revised and updated version of a draft report published in December 1977. Errors in the population data base have been corrected and new data tabulations added

  9. EPA RE-Powering America's Lands: Kansas City Municipal Farm Site ₋ Biomass Power Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Hunsberger, R. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Mosey, G. [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2015-01-01

    Through the RE-Powering America's Land initiative, the economic and technical feasibility of utilizing biomass at the Kansas City, Missouri, Municipal Farm site, a group of City-owned properties, is explored. The study that none of the technologies we reviewed--biomass heat, power and CHP--are economically viable options for the Municipal Farms site. However, if the site were to be developed around a future central biomass heating or CHP facility, biomass could be a good option for the site.

  10. The regional issues involved in the siting of power stations

    International Nuclear Information System (INIS)

    Livingstone, R.

    1980-01-01

    This paper deals with the regional implications of power station siting in England and Wales and refers to the procedures used by the CEGB to find and develop sites. The resources required for a power station are outlined both for conventional and nuclear stations and the possible development of uses for the rejected heat from power stations as a result of the energy crisis is discussed. (U.K.)

  11. Selection of sites for nuclear power plants in The Netherlands. Pt. C

    International Nuclear Information System (INIS)

    1986-01-01

    This advice is concerned with the question where possible new nuclear power plants can at best be sited in the Netherlands. Safety risks of power plants are considered (sourceterm analysis, meteorologic aspects). A site analysis is presented on the base of criteria like population density, possible emergency provisions, contamination of agricultural areas etc. Reports of several committees are included. (Auth.)

  12. Selection of sites for nuclear power plants in The Netherlands. Pt. A

    International Nuclear Information System (INIS)

    1985-01-01

    In this report a policy proposal is presented concerning the selection of location sites for new nuclear power plants in the Netherlands. Firstly it is investigated which of the 29 already selected location sites are not to be taken into further account because of obvious obstructions (close vicinity of a big city etc.). The remaining sites are judged on the base of local population magnitude. The sites that pass the last criteria are relatively compared from a large number of viewpoints. To round off the selection procedure the government will explain why they consider the finally selected sites to be suitable for location of new nuclear power plants. Steps are indicated to prevent the decrease of planologic suitability of the selected location sites. (Auth.)

  13. Underground siting of nuclear power plants: potential benefits and penalties

    International Nuclear Information System (INIS)

    Allensworth, J.A.; Finger, J.T.; Milloy, J.A.; Murfin, W.B.; Rodeman, R.; Vandevender, S.G.

    1977-08-01

    The potential for improving nuclear power safety is analyzed by siting plants underground in mined cavities or by covering plants with fill earth after construction in an excavated cut. Potential benefits and penalties of underground plants are referenced to analogous plants located on the surface. Three representative regional sites having requisite underground geology were used to evaluate underground siting. The major factors which were evaluated for all three sites were: (1) containment of radioactive materials, (2) transport of groundwater contamination, and (3) seismic vulnerability. External protection, plant security, feasibility, operational considerations, and cost were evaluated on a generic basis. Additionally, the national availability of sites having the requisite geology for both underground siting concepts was determined

  14. Nuclear architecture and landscape: the power plant creates the site

    International Nuclear Information System (INIS)

    Parent, Claude; Bouvier, Yves

    2005-01-01

    The implementation, from 1974, of the French nuclear programme, was associated with an 'Architecture Plan' requested by Michel Hug, Equipment Manager at power utility EDF. The objective was to create an architecture language specific to nuclear power. Far from trying to hide the nuclear power stations, the nuclear architecture college conversely designed one set of ambitious and powerful shapes. Systematically associated to one landscape and to one colourist, the architect sought to use in the best possible way the potentialities available on one site. The power station should not blend in with the landscape, but on the contrary, participate in the creation of a fresh landscape

  15. Brazilian nuclear power plants decommissioning plan for a multiple reactor site

    Energy Technology Data Exchange (ETDEWEB)

    Monteiro, Deiglys B.; Moreira, Joao M.L.; Maiorino, Jose R., E-mail: deiglys.monteiro@ufabc.edu.br, E-mail: joao.moreira@ufabc.edu.br, E-mail: joserubens.maiorino@ufabc.edu.br [Universidade Federal do ABC (CECS/UFABC), Santo Andre, SP (Brazil). Centro de Engenharia, Modelagem e Ciencias Aplicadas. Programa de Pos-Graduacao em Energia e Engenharia da Energia

    2015-07-01

    Actually, Brazil has two operating Nuclear Power Plants and a third one under construction, all at Central Nuclear Almirante Alvaro Alberto - CNAAA. To comply with regulatory aspects the power plants operator, Eletronuclear, must present to Brazilian Nuclear Regulatory Agency, CNEN, a decommissioning plan. Brazilian experience with decommissioning is limited because none of any nuclear reactor at the country was decommissioned. In literature, decommissioning process is well described despite few nuclear power reactors have been decommissioned around the world. Some different approach is desirable for multiple reactors sites, case of CNAAA site. During the decommissioning, a great amount of wastes will be produced and have to be properly managed. Particularly, the construction of Auxiliary Services on the site could be a good choice due to the possibility of reducing costs. The present work intends to present to the Eletronuclear some aspects of the decommissioning concept and decommissioning management, storage and disposal de wastes, based on the available literature, regulatory standards of CNEN and international experience as well as to suggest some solutions to be implemented at CNAAA site before starts the decommissioning project in order to maximize the benefits. (author)

  16. Brazilian nuclear power plants decommissioning plan for a multiple reactor site

    International Nuclear Information System (INIS)

    Monteiro, Deiglys B.; Moreira, Joao M.L.; Maiorino, Jose R.

    2015-01-01

    Actually, Brazil has two operating Nuclear Power Plants and a third one under construction, all at Central Nuclear Almirante Alvaro Alberto - CNAAA. To comply with regulatory aspects the power plants operator, Eletronuclear, must present to Brazilian Nuclear Regulatory Agency, CNEN, a decommissioning plan. Brazilian experience with decommissioning is limited because none of any nuclear reactor at the country was decommissioned. In literature, decommissioning process is well described despite few nuclear power reactors have been decommissioned around the world. Some different approach is desirable for multiple reactors sites, case of CNAAA site. During the decommissioning, a great amount of wastes will be produced and have to be properly managed. Particularly, the construction of Auxiliary Services on the site could be a good choice due to the possibility of reducing costs. The present work intends to present to the Eletronuclear some aspects of the decommissioning concept and decommissioning management, storage and disposal de wastes, based on the available literature, regulatory standards of CNEN and international experience as well as to suggest some solutions to be implemented at CNAAA site before starts the decommissioning project in order to maximize the benefits. (author)

  17. Soil class around me Serpong experimental power reactor (EPR) site plan base on micro tremor data

    International Nuclear Information System (INIS)

    Marjiyono; Soehaimi A; Hadi Suntoko; Yuliastuti; Syaeful H

    2015-01-01

    Surface geological characteristics has an important role on site response analysis in a region. In regard with experimental power reactor (EPR) construction plan in Serpong, the subsurface modeling from combination array and single station micro tremor data was done. The array and single station micro tremor measurement were performed in 9 and 90 sites, respectively, at ± 1 km radius around the EPR site plan. The Vs30 value was calculated from shear wave velocity structure around the investigated area. The soil classification based on Vs30 in the investigated area generally consists of SD (medium soil) and SC (soft rock) class. The EPR site plan its self in the SD class region. (author)

  18. Feasibility Study of Economics and Performance of Biomass Power Generation at the Former Farmland Industries Site in Lawrence, Kansas. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    Energy Technology Data Exchange (ETDEWEB)

    Tomberlin, G.; Mosey, G.

    2013-03-01

    Under the RE-Powering America's Land initiative, the U.S. Environmental Protection Agency (EPA) provided funding to the National Renewable Energy Laboratory (NREL) to support a feasibility study of biomass renewable energy generation at the former Farmland Industries site in Lawrence, Kansas. Feasibility assessment team members conducted a site assessment to gather information integral to this feasibility study. Information such as biomass resources, transmission availability, on-site uses for heat and power, community acceptance, and ground conditions were considered.

  19. Site selection for nuclear power plants and geologic seismologia influence

    International Nuclear Information System (INIS)

    Castro Feitosa, G. de.

    1985-01-01

    The site selection for nuclear power plants is analised concerning to the process, methodology and the phases in an overall project efforts. The factors affecting are analised on a general viewpoint, showing the considerations given to every one. The geologic and seismologic factors influence on the foundation design are more detailed analised, with required investigation and procedures accordingly sub-soil conditions in the site [pt

  20. On-site storage of spent nuclear fuel assemblies in German nuclear power plants

    International Nuclear Information System (INIS)

    Banck, J.

    1999-01-01

    The selection of back-end strategies for spent fuel assemblies is influenced by a number of different factors depending on the given situation in any specific country. In Germany, the back-end strategy implemented in the past was almost exclusively reprocessing. This strategy was required by the German Atomic Energy Act. Since 1994, when the Atomic Energy Act was amended, the option of direct final disposal has been granted the equivalent status by law to that afforded to reprocessing (and reuse of valuable materials). As a result, German utilities may now choose between these two alternatives. Another important condition for optimizing the back-end policy is the fact that fuel cycle costs in Germany are directly dependent on spent fuel volumes (in contrast to the US, for example, such costs are related to the amount of power generated). Another boundary condition for German utilities with respect to spent fuel management is posed by the problems with militant opponents of nuclear energy during transportation of spent fuel to interim storage sites. These facts have given rise to a reconsideration of the fuel cycle back-end, which has resulted in a change in strategy by most German utilities in favour of the following: Preference for long-term storage and maximized use of on-site storage capacity; Reduction in the amount of spent fuel by increasing burnup as much as possible. These decisions have also been driven by the deregulation of energy markets in Europe, where utilities are now permitted to sell electric power to consumers beyond their original supply network and must therefore offer electric power on a very cost competitive basis. (author)

  1. Safety in nuclear power plant siting. A code of practice

    International Nuclear Information System (INIS)

    1978-01-01

    This publication is brought out within the framework of establishing Codes of Practice and Safety Guides for nuclear power plants: NUSS programme. The scope of the document encompasses site and site-plant interaction factors related to operational states and accident conditions. The purpose of the Code is to give criteria and procedures to be applied as appropriate to operational states and accident conditions, including those which could lead to emergency situations. This Code is mainly concerned with severe events of low probability which relate to the siting of nuclear power plants and have to be considered in designing a particular nuclear power plant. Annex: Examples of natural and man-made events relevant for design basis evaluation

  2. The subject deserving wide attention for nuclear power plant siting and environmental impact assessment

    International Nuclear Information System (INIS)

    Li Yong; Li Wenhui; Zhang Lingyan

    2009-01-01

    Based on siting work of nuclear power plant, the characteristics of nuclear power plant site selection and environmental impact assessment are analysed in accordance with laws and regulations of nuclear safety and environmental protection. Some subjects deserving attentions are put forward. (authors)

  3. Earthquakes and associated topics in relation to nuclear power plant siting

    International Nuclear Information System (INIS)

    1991-01-01

    This Safety Guide was prepared as part of the Agency's programme for establishing Codes and Safety Guides relating to nuclear power plants. The main purpose of the text is to provide guidance on the determination of the design basis ground motions for a nuclear power plant at a chosen site and on the determination of the potential for surface faulting at that site. Additionally, the Guide discusses other permanent displacement phenomena (liquefaction, slope instability, subsidence and collapse) and introduces the topic of seismically induced flooding. Volcanic activity is not dealt with except in connection with tsunamis. 55 refs

  4. Remote sensing for nuclear power plant siting

    International Nuclear Information System (INIS)

    Siegal, B.S.; Welby, C.W.

    1981-01-01

    It is shown that satellite remote sensing provides timely and cost-effective information for siting and site evaluation of nuclear power plants. Side-looking airborne radar (SLAR) imagery is especially valuable in regions of prolonged cloud cover and haze, and provides additional assurance in siting and licensing. In addition, a wide range of enhancement techniques should be employed and different types of image should be color-combined to provide structural and lithologic information. Coastal water circulation can also be studied through repetitive coverage and the inherently synoptic nature of imaging satellites. Among the issues discussed are snow cover, sun angle, and cloud cover, and actual site evaluation studies in the Bataan peninsula of the Philippines and Laguna Verde, California

  5. Site selection of nuclear power plants

    International Nuclear Information System (INIS)

    Schnappauf, W.

    1982-01-01

    A stock report of the development of the extent as well as the fundamentals of the conflict about nuclear energy shows that the effective law is both another cause and a mirror of the discussions about it. In total the investigation shows that the planning of site selection suffers from a number of legal problems. They are mainly of structural kind and are concerned with the issues of citizens' participation and graduation of procedures which are central for the management of the conflict. Therefore the present set of instruments is hardly able to contribute to increasing the acceptancy. The kind and extent of issues on one hand as well as the dimension of the conflict on the other make clear that the executive power itself is overtaxed. In this situation the legislative authorities are called up to take responsibility upon themselves. There are no objections from the constitutional or other aspects to legal site selection. (orig./HSCH) [de

  6. Site selection of a dual purpose nuclear power plant in Saudi Arabia

    International Nuclear Information System (INIS)

    Hussein, F.M.; Obeid, M.A.; El-Malahy, K.S.

    1987-01-01

    Selecting a nuclear power plant site for power production and water desalination is a very complex problem, especially in countries with moderate technology. Many interrelated factors affect the process, and professional judgments by various experts are involved. Four sites, all located on the West Coast of Saudi Arabia along the Red Sea, were chosen as potential sites for building such a plant. (All sites were in either the northern or southern section of the coast; the central part was excluded for pilgrims' safety.) The East Coast was completely eliminated in the initial screening process due to its strategic location, the existence of oil fields and refineries, and its proximity to other Arabian (Persian) Gulf countries (to minimize radioactive releases to these countries in case of an accident). A computer code based on Saaty's eigenvalue technique and developed in a previous study was used in this analysis. Twenty-one main criteria were considered, and the sites were ranked to determine which was most desirable. Site 4 was found to be most suitable, followed by site 3

  7. Quality assurance in siting of Nuclear Power Plants

    International Nuclear Information System (INIS)

    2005-03-01

    This guide describes the requirements of quality assurance programme (QAP) that need to be implemented at the siting stage, by the organisation having overall responsibility for the nuclear power plant. The scope of the guide covers the quality assurance aspects related to management, performance and assessment activities during siting stage of NPPs

  8. Modeling time to recovery and initiating event frequency for loss of off-site power incidents at nuclear power plants

    International Nuclear Information System (INIS)

    Iman, R.L.; Hora, S.C.

    1988-01-01

    Industry data representing the time to recovery of loss of off-site power at nuclear power plants for 63 incidents caused by plant-centered losses, grid losses, or severe weather losses are fit with exponential, lognormal, gamma and Weibull probability models. A Bayesian analysis is used to compare the adequacy of each of these models and to provide uncertainty bounds on each of the fitted models. A composite model that combines the probability models fitted to each of the three sources of data is presented as a method for predicting the time to recovery of loss of off-site power. The composite model is very general and can be made site specific by making adjustments on the models used, such as might occur due to the type of switchyard configuration or type of grid, and by adjusting the weights on the individual models, such as might occur with weather conditions existing at a particular plant. Adjustments in the composite model are shown for different models used for switchyard configuration and for different weights due to weather. Bayesian approaches are also presented for modeling the frequency of initiating events leading to loss of off-site power. One Bayesian model assumes that all plants share a common incidence rate for loss of off-site power, while the other Bayesian approach models the incidence rate for each plant relative to the incidence rates of all other plants. Combining the Bayesian models for the frequency of the initiating events with the composite Bayesian model for recovery provides the necessary vehicle for a complete model that incorporates uncertainty into a probabilistic risk assessment

  9. Dungeness Power Station off-site emergency plan

    International Nuclear Information System (INIS)

    1993-01-01

    This off-site Emergency Plan in the event of an accidental release of radioactivity at the Dungeness Nuclear power station sets out the necessary management and coordination processes between Nuclear Electric, operators of the site, the emergency services and relevant local authorities. The objectives promoting the aim are identified and the activities which will be undertaken to protect the public and the environment in the event of an emergency are outlined. (UK)

  10. Geomorphologic specificities of selected sites for nuclear power plants in Czechoslovakia

    International Nuclear Information System (INIS)

    Kalvoda, J.; Demek, J.

    1991-01-01

    The contribution of geomorphology to the complex evaluation of properties of sites for the construction and operation of nuclear facilities is demonstrated. The unique manifestation of the present geodynamics at the Jaslovske Bohunice nuclear power plant locality and the spatial correlations of annals of the specific morphotectonic development of georeliefs of that nuclear power plant with the location of the epicentral earthquake zones are shown. The results of the geomorphological survey in the surroundings of the Temelin nuclear power plant construction site are described and a drawing is reproduced showing how the georelief of this locality divides into areas with different categories of occurrence of morpho-structural formations. For the Tetov locality, where the construction of a nuclear power plant is planned, the changes in the course of the Labe (Elbe) river which occurred in the Pleistocene are of importance in the assessment of the intensity of geodynamic processes. The geomorphological and geotectonic complexity of the planned Blahutovice nuclear power plant construction site is demonstrated. A drawing shows the morphotectonic situation in the surroundings of that construction site. (Z.S.). 4 figs

  11. Protective actions as a factor in power reactor siting

    Energy Technology Data Exchange (ETDEWEB)

    Gant, K.S.; Schweitzer, M.

    1984-06-01

    This report examines the relationship between a power reactor site and the ease of implementing protective actions (emergency measures a serious accident). Limiting populating density around a reactor lowers the number of people at risk but cannot assure that all protective actions are possible for those who reside near the reactor. While some protective measures can always be taken (i.e., expedient respiratory protection, sheltering) the ability to evacuate the area or find adequate shelter may depend on the characteristics of the area near the reactor site. Generic siting restrictions designed to identify and eliminate these site-specific constraints would be difficult to formulate. The authors suggest identifying possible impediments to protective actions at a proposed reactor site and addressing these problems in the emergency plans. 66 references, 6 figures, 8 tables.

  12. Protective actions as a factor in power reactor siting

    International Nuclear Information System (INIS)

    Gant, K.S.; Schweitzer, M.

    1984-06-01

    This report examines the relationship between a power reactor site and the ease of implementing protective actions (emergency measures a serious accident). Limiting populating density around a reactor lowers the number of people at risk but cannot assure that all protective actions are possible for those who reside near the reactor. While some protective measures can always be taken (i.e., expedient respiratory protection, sheltering) the ability to evacuate the area or find adequate shelter may depend on the characteristics of the area near the reactor site. Generic siting restrictions designed to identify and eliminate these site-specific constraints would be difficult to formulate. The authors suggest identifying possible impediments to protective actions at a proposed reactor site and addressing these problems in the emergency plans. 66 references, 6 figures, 8 tables

  13. Woking Park PAFC CHP monitoring. Phase 1: Planning, installation and commissioning

    Energy Technology Data Exchange (ETDEWEB)

    Goulding, P S; Fry, M R

    2003-07-01

    This report covers the planning, installation and commissioning of the first commercially operated fuel cell cogeneration system in the UK. The involvement of Woking Borough Council, its approach to energy efficiency, and the Woking Park site are discussed, and details are given of the PC25/C 200kW fuel cell which is manufactured in the US by UTC Fuel Cells. A description of the Woking Park fuel cell combined heat and power application is presented, and the project economics, specification and tendering are examined. The route taken to planning approval is traced, and installation procedures are outlined. The testing of the phosphoric type PC25 fuel cell cogeneration unit is described, and expected cost and project timescales are noted.

  14. Seismic PSA method for multiple nuclear power plants in a site

    Energy Technology Data Exchange (ETDEWEB)

    Hakata, Tadakuni [Nuclear Safety Commission, Tokyo (Japan)

    2007-07-15

    The maximum number of nuclear power plants in a site is eight and about 50% of power plants are built in sites with three or more plants in the world. Such nuclear sites have potential risks of simultaneous multiple plant damages especially at external events. Seismic probabilistic safety assessment method (Level-1 PSA) for multi-unit sites with up to 9 units has been developed. The models include Fault-tree linked Monte Carlo computation, taking into consideration multivariate correlations of components and systems from partial to complete, inside and across units. The models were programmed as a computer program CORAL reef. Sample analysis and sensitivity studies were performed to verify the models and algorithms and to understand some of risk insights and risk metrics, such as site core damage frequency (CDF per site-year) for multiple reactor plants. This study will contribute to realistic state of art seismic PSA, taking consideration of multiple reactor power plants, and to enhancement of seismic safety. (author)

  15. Phosphoric acid fuel cell R and D activities at KACST

    International Nuclear Information System (INIS)

    Ghouse, M.; Aba-Oud, H.; Ba-Junaid, M.; Al-Garni, M.; Quadri, M.I.

    1993-01-01

    The PAFC (Phosphoric Acid Fuel Cell) activities are directed towards the development of components of single cell and experimental stacks at KACST. The main aim of the present task is to design and construct a 1 kW PAFC Stack and demonstrate it by integrating with an electrolyser using a DC current generated by a photovoltaic power source. This paper describes the preparation of porous teflon bonded gas diffusion carbon electrodes and their evaluation as single phosphoric acid fuel cells using hydrogen as a fuel and oxygen/air as an oxidant. 6 figs., 2 tabs., 15 refs

  16. A Site Selection Model for a Straw-Based Power Generation Plant with CO2 Emissions

    Directory of Open Access Journals (Sweden)

    Hao Lv

    2014-10-01

    Full Text Available The decision on the location of a straw-based power generation plant has a great influence on the plant’s operation and performance. This study explores traditional theories for site selection. Using integer programming, the study optimizes the economic and carbon emission outcomes of straw-based power generation as two objectives, with the supply and demand of straw as constraints. It provides a multi-objective mixed-integer programming model to solve the site selection problem for a straw-based power generation plant. It then provides a case study to demonstrate the application of the model in the decision on the site selection for a straw-based power generation plant with a Chinese region. Finally, the paper discusses the result of the model in the context of the wider aspect of straw-based power generation.

  17. Analysis of extreme hydrometric values in the nuclear power plants siting

    International Nuclear Information System (INIS)

    Gomez, H.R.; Maggio, G.E.; Tripoli, C.R.

    1983-01-01

    The atucha nuclear power plants are located on the right shore of the Parana de las Palmas river in the entire transition between a fluvial regime and other of tides. Since the disponibility of cooling water is one of the factors to take into account when choosing the nuclear power plant site, it is essential to perform a probabilistic study of extreme hydrometric values. Deterministic and historical analysis should be done to complete the studies already mentioned, in order to establish the values of probable maximum floods. From the application of these methods, it is concluded that the site of the Atucha nuclear power plants constitutes a hydrometric singularity, so that, an optimization has been obtained from that point of view. (Author) [es

  18. Facilities and medical care for on-site nuclear power plant radiological emergencies

    International Nuclear Information System (INIS)

    Anon.

    1979-01-01

    The operation of a nuclear power plant introduces risks of injury or accidents that could also result in the exposure of personnel to radiation or radioactive materials. It is important in such an event to have adequate first aid and medical facilities, supplies, equipment, transportation capabilities and trained personnel available to provide necessary care. This standard provides guidance for first aid during an emergency and for initial medical care of those overexposed to penetrating radiation or contaminated with radioactive material or radionuclides. Recommendations cover facilities, supplies, equipment and the extent of care on-site, where first aid and initial care may be provided, and off-site at a local hospital, where further medical and surgical care may be provided. Additional recommendations are also provided for the transportation of patients and the training of personnel. A brief discussion of specialized care is provided in an appendix

  19. Site selection and evaluation of nuclear power units in Egypt

    International Nuclear Information System (INIS)

    Bonnefille, R.

    1980-01-01

    The selection of sites for nuclear power units in Egypt by SOFRATOME for Nuclear Plants Authority is carried on using a method based on interaction between different criteria. The method and the main results on criterion 'radio-ecological impact' are sketched briefly [fr

  20. Volcanoes and associated topics in relation to nuclear power plant siting

    International Nuclear Information System (INIS)

    1997-01-01

    The main purpose of this report is to provide draft guidance on the criteria and methods for the evaluation of a site for a nuclear power plant with respect to the potential effects of volcanic activity which may jeopardize its safety and to elicit feedback from Member States. Different types of phenomena associated with volcanism are discussed in terms of their influence on site acceptability and on derivation of design basis parameters. This report was developed for application to new nuclear power plant sites. It does not address the issue of the re-evaluation of existing nuclear power sites to the potential effects of volcanic activity, although it contains general information and criteria useful for this purpose. The guidelines and procedures discussed in this report can appropriately be used as the basis for the safe siting and design of nuclear power plants in different volcanic environments. In this report, the description of the phenomena associated with volcanism and the collection of required data and information are separated from the criteria for hazard assessment. Thus Section 2 gives the non-specialist a general description of the different types of volcanic phenomena and Section 4 provides indication on the acquisition of the database. Section 3 outlines the general requirements to be fulfilled during site selection and evaluation. Sections 5, 6 and 7 provide guidance to perform the hazard assessment and to derive the design basis parameters. Finally, Section 8 deals with monitoring systems. As general information for the non-specialist, Annex I provides the major divisions of geological time. With the same spirit, and recognizing that a complete consensus has not been reached in the scientific community on the use and meaning of some terms, a glossary of volcanological definitions is given in Annex II, applicable only to the use of this report. Finally, Annex III provides an example of a classification of volcanoes that may be used for capability

  1. Perryman Nuclear Power Plant. Site suitability--site safety report, volume I: chapters-sections 1.1, 1.2, 1.4, 1.6; 2.1, 2.2

    International Nuclear Information System (INIS)

    1977-01-01

    A site suitability report is submitted in support of the Baltimore Gas and Electric Company application for a limited early site review of a potential nuclear power plant. The Perryman Nuclear Power Plant site is located in northeastern Maryland on an arm of the Chesapeake Bay estuary approximately 17 miles east--northeast of Baltimore. The proposed plant is a two-unit light water reactor with a 3800 MW(t) power level for each unit. General descriptions of the site geography, demography, nearby facilities, and meteorology are presented

  2. The site of a nuclear power plant and environmental safety; Ydinvoimalaitoksen sijaintipaikka ja ympaeristoen turvallisuus

    Energy Technology Data Exchange (ETDEWEB)

    Rossi, J. [VTT Energy, Espoo (Finland)

    2001-11-01

    The purpose of this report is to give the reader a general view of the things associated with the site of a nuclear power plant. In this context the effect of a nuclear power plant and site on environmental safety is considered. Planning, construction and operating a nuclear power plant require several judgements and licenses based on different laws. The location of the planned nuclear facility project and environmental conditions contribute in great detail to the compliance arguments of permits. At first the environmental impacts of the siting project and its alternatives shall be investigated in the Environmental Impact Assessment procedure. Then the decision in principle according to the Nuclear Energy Act can be applied from the Council of State, the decision shall further be confirmed by Parliament. When the decision in principle is considered the overall good of society shall be assessed by means of considering i.a. site alternatives and safety. The safety related basic principle is that operation of a nuclear power plant may not cause danger to the environment, public or property. After the affirmative principle approval the construction license and later on the operation license can be applied from the Council of State, these licenses need to be supported i.a. by building and environmental licenses of separate authorities. Also some international contracts concern realisation of a nuclear power plant siting. The nuclear power plant site shall be suitable for the needs of the electricity production and the transmission system and it shall be technically appropriate for building and operation of a power plant. The site shall be safe enough on the other hand from the view of external events threatening the power plant - although one can be partly prepared for these things in the design of the plant - and on the other hand from the point of public safety. Requirements for the safety of the site are directed in the decision of the Council of State's general

  3. Rocketdyne Propulsion & Power DOE Operations Annual Site Environmental Report 1996

    Energy Technology Data Exchange (ETDEWEB)

    Tuttle, R. J. [The Boeing Company, Canoga Park, CA (United States)

    1997-11-10

    This annual report discusses environmental monitoring at two manufacturing and test operations sites operated in the Los Angeles area by Rocketdyne Propulsion & Power of Boeing North American. Inc. (formerly Rockwell International Corporation). These are identified as the Santa Susana Field Laboratory (SSFL and the De Soto site. The sites have been used for manufacturing; R&D, engineering, and testing in a broad range of technical fields, primarily rocket engine propulsion and nuclear reactor technology. The De Soto site essentially comprises office space and light industry with no remaining radiological operations, and has little potential impact on the environment. The SSFL site, because of its large size (2.668 acres), warrants comprehensive monitoring to ensure protection of the environment.

  4. Demographic survey around proposed nuclear power plant site in Haryana covering 30 km radius area from the site

    International Nuclear Information System (INIS)

    Garg, V.K.

    2013-01-01

    This study was planned to have a demographic survey of the households living within 30 km radius of the proposed site. Objectives of the present study were to attain the quantitative baseline demographic data around (within 30 km radius) the proposed site of nuclear power plant, zone-wise and sector-wise distribution of the population around proposed site up to a distance of 30 km from the site, to obtain the data on socio-economic, cultural, and religious perspectives of the target populations, to obtain the data on disease/illness pattern in the target population, health status and mortality rate

  5. Solar-Powered Air Stripping at the Rocky Flats Site, Colorado - 12361

    Energy Technology Data Exchange (ETDEWEB)

    Boylan, John A. [S.M. Stoller Corporation, Rocky Flats Site, 11025 Dover Street, Suite 1000, Westminster, Colorado 80021 (United States)

    2012-07-01

    The U.S. Department of Energy's Rocky Flats Site (the Site), near Denver, Colorado, is a former nuclear weapons facility that was constructed beginning in 1951. With the end of the Cold War, the Site was cleaned up and closed in 2005. Four gravity-driven groundwater treatment systems were installed during cleanup, and their continued operation was incorporated into the final remedy for the Site. All utilities, including electrical power, were removed as part of this closure, so all Site electrical power needs are now met with small solar-powered systems. The Mound Site Plume Treatment System (MSPTS) was installed in 1998 as an innovative system based on zero-valent iron (ZVI). Groundwater flow from the Mound source area containing elevated concentrations of volatile organic compounds (VOCs), primarily in the tetrachloroethene (PCE)-trichloroethene (TCE) family of chlorinated solvents, is intercepted by a collection trench and routed to twin ZVI treatment cells. Later, in 2005, remediation of VOC-contaminated soils at a second up-gradient source area included adding an electron donor to the backfill to help stimulate biodegradation. This reduced concentrations of primary constituents but caused down-gradient groundwater to contain elevated levels of recalcitrant degradation byproducts, particularly cis-1,2-dichloroethene and vinyl chloride. A gravel drain installed as part of the 2005 remediation directs contaminated groundwater from this second source area to the MSPTS for treatment. This additional contaminant load, coupled with correspondingly reduced residence time within the ZVI media due to the increased flow rate, resulted in reduced treatment effectiveness. Elevated concentrations of VOCs were then detected in MSPTS effluent, as well as in surface water at the downstream performance monitoring location for the MSPTS. Subsequent consultations with the Site regulators led to the decision to add a polishing component to reduce residual VOCs in MSPTS

  6. Recommended criteria for the evaluation of on-site nuclear power plant emergency exercises

    International Nuclear Information System (INIS)

    Lafortune, J.F.

    1997-01-01

    A review of existing Canadian and International emergency exercise evaluation criteria and approaches has been conducted. Based on the results of the review, criteria are proposed for the evaluation of on-site emergency exercises for Canadian nuclear power stations. The proposed criteria are performance-based. They are comprehensive, yet remain adaptable to all stations and accident scenarios. They are primarily aimed at radiological emergency exercises, but are entirely applicable to fire or other conventional exercises. This report also addresses evaluation preparation and methodology. (author). 21 refs., 6 tabs

  7. Siting of nuclear power plants on artificial islands: the Belgian situation

    International Nuclear Information System (INIS)

    Gol, J.G.

    1976-01-01

    The building of nuclear stations on the national territory involves reticences of an ecological nature which have induced technicians to consider other siting facilities. The creation of artificial islands, in particular nuclear stations, is therefore suggested. In the present state of the law of the sea, such construction gives rise to some intricate legal problems and leads to consideration of every notion, from the territorial sea to the exclusive economic zone. Especially regarding Belgium, the problem is to know where the legal competence for these facilities will lie. After analysis, it has been estimated that regional bodies have no specific powers in this regard and that no norm with a restricted territorial scope may be applied. (Auth) [fr

  8. Influence of the crustal and subcrustal Vrancea seismic sources on Cernavoda nuclear power plant site

    International Nuclear Information System (INIS)

    Marmureanu, Gheorghe; Popescu, Emilia; Mircea Radulian

    2002-01-01

    The basis of the seismic hazard assessment in different geographical regions with dense-populated areas and strategic objectives (dams, nuclear power plants, etc.) is the study of seismicity of the seismogenic sources which affect these sites. The purpose of this paper is to provide a complete set of information relative to the Vrancea seismic source (in the crust and the intermediate depth domains) that is fundamental for the seismic hazard evaluation at Cernavoda nuclear power plant site. The analysis that we propose has to deal with the following items: (1) geometrical definition of the seismic sources; (2) setting the earthquake catalog associated to each seismic source; (3) estimation of the maximum possible magnitude; (4) estimation of the frequency - magnitude relationship; (5) computation of the distribution function for focal distance; (6) correlation between focal depth and magnitude; (7) attenuation law. We discuss also the implications of the model parameters on the seismic hazard level. (authors)

  9. A Low Cost Shading Analyzer and Site Evaluator Design to Determine Solar Power System Installation Area

    Directory of Open Access Journals (Sweden)

    Selami Kesler

    2015-01-01

    Full Text Available Shading analyzer systems are necessary for selecting the most suitable installation site to sustain enough solar power. Afterwards, changes in solar data throughout the year must be evaluated along with the identification of obstructions surrounding the installation site in order to analyze shading effects on productivity of the solar power system. In this study, the shading analysis tools are introduced briefly, and a new and different device is developed and explained to analyze shading effect of the environmental obstruction on the site on which the solar power system will be established. Thus, exposure duration of the PV panels to the sunlight can be measured effectively. The device is explained with an application on the installation area selected as a pilot site, Denizli, in Turkey.

  10. Design basis flood for nuclear power plants on coastal sites

    International Nuclear Information System (INIS)

    1983-01-01

    This Guide discusses the phenomena causing coastal floods (storm surge, seiche, tsunami and wind-wave) and gives a general description of the methods used and the critical factors involved in the evaluation of such floods and of their associated effects. In addition, some treatment is presented of the possible combinations of two or more of these phenomena to produce a DBF. Methods are also provided for evaluating the reference water levels, taking into account the effect of tides, sea level anomalies and changes in lake level and river flow. Sites vulnerable to coastal flooding are located on open coastal regions, semi-enclosed bodies of water and enclosed bodies of water. Open coastal regions are those portions of land directly exposed to and having a shore on a major body of water. Semi-enclosed bodies of water are lagoons, river estuaries, gulfs, fjords and rias. Enclosed bodies of water are lakes and reservoirs. The phenomena of the lowering of the water level at coastal sites caused by offshore winds, low tides, wave effects or of drawdown caused by tsunamis are discussed. The static and dynamic effects of floods resulting from the various combinations (independent and interdependent) of surface waves of varying frequency are also discussed. Consideration is also given to shoreline instabilities and to the effects of erosion. Estimated flood levels and related effects on the nuclear power plant, which will vary according to the method of analysis and the type of flooding considered, shall be compared with available historical data where this is relevant, to check the conservativeness of the evaluated results

  11. The PLATO Dome A site-testing observatory: Power generation and control systems

    Science.gov (United States)

    Lawrence, J. S.; Ashley, M. C. B.; Hengst, S.; Luong-van, D. M.; Storey, J. W. V.; Yang, H.; Zhou, X.; Zhu, Z.

    2009-06-01

    The atmospheric conditions above Dome A, a currently unmanned location at the highest point on the Antarctic plateau, are uniquely suited to astronomy. For certain types of astronomy Dome A is likely to be the best location on the planet, and this has motivated the development of the Plateau Observatory (PLATO). PLATO was deployed to Dome A in early 2008. It houses a suite of purpose-built site-testing instruments designed to quantify the benefits of Dome A site for astronomy, and science instruments designed to take advantage of the observing conditions. The PLATO power generation and control system is designed to provide continuous power and heat, and a high-reliability command and communications platform for these instruments. PLATO has run and collected data throughout the winter 2008 season completely unattended. Here we present a detailed description of the power generation, power control, thermal management, instrument interface, and communications systems for PLATO, and an overview of the system performance for 2008.

  12. Feasibility Study of Economics and Performance of Geothermal Power Generation at the Lakeview Uranium Mill Site in Lakeview, Oregon. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    Energy Technology Data Exchange (ETDEWEB)

    Hillesheim, M.; Mosey, G.

    2013-11-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Lakeview Uranium Mill site in Lakeview, Oregon, for a feasibility study of renewable energy production. The EPA contracted with the National Renewable Energy Laboratory (NREL) to provide technical assistance for the project. The purpose of this report is to describe an assessment of the site for possible development of a geothermal power generation facility and to estimate the cost, performance, and site impacts for the facility. In addition, the report recommends development pathways that could assist in the implementation of a geothermal power system at the site.

  13. Toward a regional power plant siting method: AEC-Maryland regional siting factors study, FY 1974 progress report

    International Nuclear Information System (INIS)

    Yaffee, S.L.; Miller, C.A.

    1974-11-01

    The ''AEC-Maryland Regional Siting Factors Study'' examines the process of siting in a regional context. It is developing an analysis method to delineate candidate areas for siting of several power plant technology packages, including both fossil-fueled and nuclear options. Tools that are being used include simulation modeling, economic and demographic forecasting, spatial analysis, and computer graphics and numerical manipulation. The approach will describe the trade-offs incurred if a power plant is located in one candidate area rather than in another. In FY 1974, a suitability analysis method was developed which uses engineering and environmental parameters to define a level of environmental cost incurred if a segment of land is used to site a specific technology package. (U.S.)

  14. TechSolutions 11: An Introduction to Power and Energy

    Science.gov (United States)

    2009-01-01

    facilitate ionic conduction under hydrated conditions. The operating temperature for PEMFCs is relatively cool (70°C). The reactions on the anode and...cathode side of the FC are the same as those shown for PAFCs. Direct methanol fuel cells (DMFCs) are a subset of PEMFCs . These FCs utilize the same...an electrically E58 The AMMTIAC Quarterly, Volume 4, Number 1 Figure 7. Diagram of a PEMFC .[47] 1 Hydrogen fuel is channeled through field flow

  15. EPA RE-Powering Mapper: Alternative Energy Potential at Cleanup Sites

    Science.gov (United States)

    The U.S. Environmental Protection Agency (EPA) Office of Land and Emergency Management??s (OLEM) Office of Communications, Partnerships and Analysis (OCPA) initiated the RE-Powering America's Land Initiative to demonstrate the enormous potential that contaminated lands, landfills, and mine sites provide for developing renewable energy in the United States. EPA developed national level site screening criteria in partnership with the U.S. Department of Energy (DOE) National Renewable Energy Laboratory (NREL) for wind, solar, biomass, and geothermal facilities. While the screening criteria demonstrate the potential to reuse contaminated land for renewable energy facilities, the criteria and data are neither designed to identify the best sites for developing renewable energy nor all-inclusive. Therefore, more detailed, site-specific analysis is necessary to identify or prioritize the best sites for developing renewable energy facilities based on the technical and economic potential. Please note that these sites were only pre-screened for renewable energy potential. The sites were not evaluated for land use constraints or current on the ground conditions. Additional research and site-specific analysis are needed to verify viability for renewable energy potential at a given site.

  16. Recommended criteria for the evaluation of on-site nuclear power plant emergency plans, volume II: criteria

    International Nuclear Information System (INIS)

    1997-01-01

    A critical review of existing Canadian and international nuclear power plant (NPP) emergency plans, evaluation criteria, and approaches has been conducted to provide AECB staff with information which can be used to assess the adequacy of NPP on-site emergency response plans. The results of this work are published in two volumes. Volume I, Basis Document, provides the reasons why certain requirements are in place. It also gives comprehensive references to various standards.Volume II, Criteria, contains the criteria which relate to on-site actions and their integration with control room activities and the roles of off-site responsible organizations. The recommended criteria provide information on what is required, and not on how to accomplish the requirements. The licensees are given the latitude to decide on the methods and processes needed to meet the requirements. The documents do not address NPP off-site plans and response capability, or the control room emergency operating procedures and response capability. This report contains only Volume II: Criteria. 55 refs., 2 tabs., 1 fig

  17. Data book on new energy technology development in FY 1997. Fuel cells; Shin energy gijutsu kaihatsu kankei data shu sakusei chosa. Nenryo denchi

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    The purpose of this survey is to grasp the trends of technology development of fuel cells and their market, and to provide data required for supporting the introduction and diffusion of fuel cells. This report consists of Part 1 titled as `Trends of development of fuel cells in FY 1997`, and Part 2 titled as `Compiled data`. The Part 1 consists of three chapters, i.e., Chapter 1 titled as `Introduction`, Chapter 2 as `Development trends of fuel cells for on-site power generation`, and Chapter 3 as `Trends of development of fuel cells for mobile objects and fuel cell-powered vehicles`. The introductory chapter not only outlines the development trends but also describes the results of the 5th Grove Fuel Cell Symposium noticed as the major global international symposium on fuel cell in general and the environmental problems discussed at the COP3 Kyoto Conference, both held in TY 1997. The Part 2 contains the principles, system configurations and applications of fuel cells, PAFC, MCFC, SOFC, PEFC, modifier, DMFC, development trend of fuel cell-powered vehicles, and national policies for fuel cells in Japan. The Appendix features a report of the new technique investigation working group and information on fuel cells from newspapers. 100 refs., 4 figs.

  18. Evaluation of reliability of on-site A.C. power systems based on maintenance records

    Energy Technology Data Exchange (ETDEWEB)

    Basso, G.; Pia, S. [ENEA/TERM/VAOEC, C.R.E. Casaccla via Anguillarese, 00100 Roma/Rome (Italy); Fusari, W. [ENEL, Rome (Italy); Soressi, G.; Vaccari, G. [ENEL, Centro di Ricerca Termica e Nucl., Via Rubattino, 54, 1-20134 Mllano/Milan (Italy)

    1986-02-15

    To the end of ascertain in what extent the evaluation of reliability of emergency diesel generators (D.G.) can be improved by means of a deeper knowledge of their operating history a study has been carried-out on 21 D.G. sets: 4 D.G. of the Caorso nuclear plant (BWR, 870 MWe) and 17 D.G. in service at 6 steam-electric fossil-fuelled plants. The major points of interest resulting from this study are: 1) reliability assessments of A.C. on-site power Systems, made on the basis of outcomes of surveillance tests, may lead to results which overestimate the real performance. 2) the unreliability of a redundant System of stand-by components is determined in large extent by unavailabilities due to scheduled and unscheduled maintenance, latent failures, tests. (authors)

  19. Evaluation of reliability of on-site A.C. power systems based on maintenance records

    International Nuclear Information System (INIS)

    Basso, G.; Pia, S.; Fusari, W.; Soressi, G.; Vaccari, G.

    1986-01-01

    To the end of ascertain in what extent the evaluation of reliability of emergency diesel generators (D.G.) can be improved by means of a deeper knowledge of their operating history a study has been carried-out on 21 D.G. sets: 4 D.G. of the Caorso nuclear plant (BWR, 870 MWe) and 17 D.G. in service at 6 steam-electric fossil-fuelled plants. The major points of interest resulting from this study are: 1) reliability assessments of A.C. on-site power Systems, made on the basis of outcomes of surveillance tests, may lead to results which overestimate the real performance. 2) the unreliability of a redundant System of stand-by components is determined in large extent by unavailabilities due to scheduled and unscheduled maintenance, latent failures, tests. (authors)

  20. Public regulation of site selection for nuclear power plants. Present procedures and reform proposals: an annotated bibliography

    International Nuclear Information System (INIS)

    Klema, E.D.; West, R.L.

    1977-01-01

    Part I of this bibliography contains literature which describes the process of power-plant siting as conducted by the utilities, siting procedures at the point of initiative, analytical tools employed or proposed for site assessment by enterprises in the industry, and the wide range of considerations which the utilities take into account in making site assessments. Part II contains studies and reports on the structure and process of public regulation of power plant siting: the licensing of nuclear facilities by the NRC under terms of the special Government powers in the field of nuclear energy that have evolved since World War II; the steady expansion of regulatory objectives bearing on site approval for nuclear power plants; local government, State, and other Federal agency regulation of siting; survey siting procedures in other countries; the role of regulatory delay in the long lead-time required for construction and operation of nuclear plants. Part III incudes citations on regulatory structure and practice that are unresponsive to the public interest; regulatory decision making's insufficient accessible to public scrutiny and participation; and regulatory procedures that encourage and protect inefficient practices of the regulated industries. Some legal decisions and case studies are included. Part IV, Reform Proposals, includes citations on regulatory reform and reform of siting regulations. Abstracts are provided with 157 of the citations with many more papers cited by title, author, and accession data

  1. The Role of Tectonic and Seismicity in Siting of Nuclear Power Plant

    International Nuclear Information System (INIS)

    Abdel Aziz, M.A.H.

    2008-01-01

    The site selection for the a nuclear power plant (NPP) is controlled by many criteria. One of the most important criterion is the tectonic and seismicity of the site and its surroundings. Since, it is preferable the site in concern is characterized by low tectonic and low seismicity to avoid the damage effects associated with the occurrence of destructive earthquakes. The investigation of the tectonic and seismicity maps of egypt has been carried out to candidate potential areas or sites for nuclear power plant installation from seismicity point of view. Also, the design basis ground motion in terms of peak ground acceleration and response spectra of some of the potential sites are defined through the conduct of probabilistic seismic hazard analysis The study revealed that although there is no criterion to exclude areas of high tectonic and high seismicity as potential sites for nuclear power plant installation but, it is preferable avoiding such areas. This is attributed to the critical seismic curve that characterizes such areas and is required high seismic design levels to resist the destructive vibratory ground motion associated with the expected earthquake. Consequently, the required high seismic design levels will have a negative impact on the economic cost of the facility compared with that built in low and moderate seismic areas. Hence, areas like the gulf of suez, the northern part of the Red Sea and the southern part of Sinai Peninsula should be avoided as potential sites for NPP from the tectonic and seismicity point of view. On the other hand, areas like Nile delta and its valley, the Northern and Southern parts of Western desert and the central and southern parts of the Eastern Desert should be candidate as potential sites on condition, the other criteria meet the IAEA's regulations. Also, the seismic hazard curve of the Northwest littoral zone reflects low design basis ground motion values compared with the Nile delta region

  2. Operating experience and licensing criteria relating to on-site electric power systems in Italy

    International Nuclear Information System (INIS)

    Ciattaglia, S.; Grimaldi, G.

    1986-01-01

    The most significant events of on-site electrical power supply degradation in Italian plants took place in coincidence with severe atmospheric conditions or with the propagation of disturbances by lightning stroke inside the plant. Essential instrumentation was lost in two cases so that, for some time, no indication of the plant status was allowed. In both cases the recovery of the plant was achieved by restoration of external power supply. Corrective actions included both improvement in immunity to disturbances, redundancy, capability and physical separation and DG's reliability demonstration. Design and safety analysis of new plants are now carried out with the help of reliability studies and probabilistic risk assessment. As a result, design changes were performed on new plants to improve the reliability of DGs start-up and the independence of the electrical emergency divisions. (authors)

  3. Operating experience and licensing criteria relating to on-site electric power systems in Italy

    Energy Technology Data Exchange (ETDEWEB)

    Ciattaglia, S.; Grimaldi, G. [ENEA/DISP, Via Vitaliano Brancati, 48, 00144 Roma/Rome (Italy)

    1986-02-15

    The most significant events of on-site electrical power supply degradation in Italian plants took place in coincidence with severe atmospheric conditions or with the propagation of disturbances by lightning stroke inside the plant. Essential instrumentation was lost in two cases so that, for some time, no indication of the plant status was allowed. In both cases the recovery of the plant was achieved by restoration of external power supply. Corrective actions included both improvement in immunity to disturbances, redundancy, capability and physical separation and DG's reliability demonstration. Design and safety analysis of new plants are now carried out with the help of reliability studies and probabilistic risk assessment. As a result, design changes were performed on new plants to improve the reliability of DGs start-up and the independence of the electrical emergency divisions. (authors)

  4. Wind Power Opportunities in St. Thomas, USVI: A Site-Specific Evaluation and Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Lantz, E.; Warren, A.; Roberts, J. O.; Gevorgian, V.

    2012-09-01

    This NREL technical report utilizes a development framework originated by NREL and known by the acronym SROPTTC to assist the U.S. Virgin Islands in identifying and understanding concrete opportunities for wind power development in the territory. The report covers each of the seven components of the SROPTTC framework: Site, Resource, Off-take, Permitting, Technology, Team, and Capital as they apply to wind power in the USVI and specifically to a site in Bovoni, St. Thomas. The report concludes that Bovoni peninsula is a strong candidate for utility-scale wind generation in the territory. It represents a reasonable compromise in terms of wind resource, distance from residences, and developable terrain. Hurricane risk and variable terrain on the peninsula and on potential equipment transport routes add technical and logistical challenges but do not appear to represent insurmountable barriers. In addition, integration of wind power into the St. Thomas power system will present operational challenges, but based on experience in other islanded power systems, there are reasonable solutions for addressing these challenges.

  5. The Choice of Sites for the First Nuclear Power Plants in Brazil

    International Nuclear Information System (INIS)

    Cintra do Prado, L.

    1966-01-01

    In selecting the sites for nuclear power plants a decision has to be taken as to (1) which area of the country is best suited for the purpose - e.g. the area of Recife, Rio or Sao Paulo, etc. - given the trend in energy requirements and the availability of resources, and (2) where to site the plant or plants within that area. In this paper I shall concentrate on the first of these problems and shall be concerned with assessing the merits and demerits of installing nuclear power plants in certain regions of Brazil which seem particularly well suited for the purpose

  6. Hinkley Point 'C' power station public inquiry: proof of evidence on local site related issues

    International Nuclear Information System (INIS)

    Gammon, K.M.

    1988-09-01

    A public inquiry has been set up to examine the planning application made by the Central Electricity Generating Board (CEGB) for the construction of a 1200 MW Pressurized Water Reactor power station at Hinkley Point (Hinkley Point ''C'') in the United Kingdom, adjacent to an existing nuclear power station. The CEGB evidence to the Inquiry on local site related issues begins by setting the proposed development within the context of local authority planning policies for the area. The implications of the development in terms of overall land needs, construction, access, buildings and works both temporary and permanent, are described. Environmental impacts, aesthetic and socio-economic factors are considered including possible effects on agriculture, nature conservation, water supply, transport and employment. (UK)

  7. Selection of sites for nuclear power plants in The Netherlands. Pt. B

    International Nuclear Information System (INIS)

    1986-01-01

    In this report the headlines are presented of the participation of the Dutch people in the policy resolution with regard to the selection of sites of nuclear power plants. In Ch. 1 it is indicated how this participation is organized and the quantitative results are given. In the other chapters the results of the people's participation are treated qualitatively with restriction to the headlines. In Ch. 3 the remarks about the procedure and its precedents are reported. Ch. 4 reflects the public opinion with regard to the (nuclear) energy problem. In Ch. 5 finally the problems concerning the sites of nuclear power plants are treated. The criteria are discussed used by the participants in the judgement of the locations on their aptitude, in general as well as by possible site. (Auth.)

  8. On-Site or Off-Site Renewable Energy Supply Options?

    DEFF Research Database (Denmark)

    Marszal, Anna Joanna; Heiselberg, Per; Jensen, Rasmus Lund

    2012-01-01

    The concept of a Net Zero Energy Building (Net ZEB) encompasses two options of supplying renewable energy, which can offset energy use of a building, in particular on-site or off-site renewable energy supply. Currently, the on-site options are much more popular than the off-site; however, taking...... into consideration the limited area of roof and/or façade, primarily in the dense city areas, the Danish weather conditions, the growing interest and number of wind turbine co-ops, the off-site renewable energy supply options could become a meaningful solution for reaching ‘zero’ energy goal in the Danish context...... five technologies, i.e., two on-site options: (1) photovoltaic, (2) micro combined heat and power, and three off-site options: (1) off-site windmill, (2) share of a windmill farm and (3) purchase of green energy from the 100% renewable utility grid. The results indicate that in case of the on...

  9. Hinkley Point 'C' power station public inquiry: proof of evidence on on-site radioactive waste management and decommissioning

    International Nuclear Information System (INIS)

    Passant, F.H.

    1988-09-01

    A public inquiry has been set up to examine the planning application made by the Central Electricity Generating Board (CEGB) for the construction of a 1200 MW Pressurized Water Reactor power station at Hinkley Point (Hinkley Point ''C'') in the United Kingdom. The CEGB evidence to the Inquiry presented here provides information on the on-site management of solid, liquid and gaseous radioactive wastes both during station operation and during decommissioning. Estimates are given of current and projected future discharges of liquid and gaseous wastes from the site and packaging and transport arrangements for solid radioactive wastes are described. The framework of waste management policy, disposal strategy and legislation in the United Kingdom which will determine procedure at Hinkley Point ''C'' is given. (UK)

  10. On-site power generation for the future

    Energy Technology Data Exchange (ETDEWEB)

    McCarroll, R.L.; Partanen, W.E. [Power Generating, Inc., Fort Worth, TX (United States)

    1993-12-31

    Power Generating, Inc. is developing a direct-fired gas turbine power system designed to operate on solid fuel. This presentation will summarize the results of the development work performed to date and will outline the program currently underway to demonstrate the technical and economic viability of a gas turbine fired on white wood and subsequently on coal. The presentation will describe testing already completed on a pressurized cyclonic burner which forms the external combustion stage for the solid fuel fired gas turbine and the testing that has been done on various fuels categorized as acceptable {open_quotes}fuels of choice{close_quotes} for the demonstration project. Also to be covered will be a discussion of the equipment to be used in the demonstration project, the reasons why specific pieces of equipment have been selected, and how they might be modified for the gas turbine application.

  11. 76 FR 82201 - General Site Suitability Criteria for Nuclear Power Stations

    Science.gov (United States)

    2011-12-30

    ... guidelines in identifying suitable candidate sites for nuclear power stations. The decision that a station... combination and a cost-benefit analysis comparing it with alternative site-plant combinations, as discussed in...

  12. Power plant site evaluation, electric energy demand forecasts - Douglas Point Site. Volume 3. Final report

    International Nuclear Information System (INIS)

    Wilson, J.W.

    1975-07-01

    This is part of a series of reports containing an evaluation of the proposed Douglas Point nuclear generating station site located on the Potomac River in Maryland 30 miles south of Washington, D.C. This report contains chapters on the Potomac Electric Power Company's market, forecasting future demand, modelling, a residential demand model, a nonresidential demand model, the Southern Maryland Electric Cooperative Model, short term predictive accuracy, and total system requirements

  13. Analysis of HFETR shut-down state caused by loss of off-site power supply

    International Nuclear Information System (INIS)

    Wang Jinghu

    1997-01-01

    During the last 15 years, there are more than 40 unplanned shut-downs caused by loss of off-site power in HFETR. Because HFETR is a special research reactor, the author describes the shut-down state as three period. The author also discusses the influence of the number of shut-down due to loss of off-site power supply on the reactor safety, and propose some suggestions and measures to reduce the effects

  14. Fiscal impacts associated with power reactor siting: a paired case study

    Energy Technology Data Exchange (ETDEWEB)

    Bjornstad, D.J.

    1977-01-19

    The paper examines the fiscal impacts associated with siting nuclear-powered electrical stations. First, a framework for examining fiscal impacts is constructed. This framework consists of four elements: the ability of a local community to raise revenues, the degree to which this ability is used, the uses to which tax revenues are applied, and the effect of tax/expenditure decisions on the local economy. Changes in these four elements caused by the siting are termed fiscal impacts. Second, this framework is applied to two communities, Waterford, Connecticut and Plymouth, Massachusetts, which host operating reactors. In each community the ability to raise revenues through the property tax--the prime local revenue source--approximately doubled. As a result both communities chose ultimately to reduce tax rates. Moreover, it appears that the annual revenues raised through the public sector as a result of the reactor siting exceeded income changes that resulted from increased local employment associated with each reactor's operation. It therefore appears that for these two towns, the primary economic impact occurred through the public sector. The report concludes with suggestions for further research into local fiscal and economic effects associated with power reactor siting.

  15. Fiscal impacts associated with power reactor siting: a paired case study

    International Nuclear Information System (INIS)

    Bjornstad, D.J.

    1977-01-01

    The paper examines the fiscal impacts associated with siting nuclear-powered electrical stations. First, a framework for examining fiscal impacts is constructed. This framework consists of four elements: the ability of a local community to raise revenues, the degree to which this ability is used, the uses to which tax revenues are applied, and the effect of tax/expenditure decisions on the local economy. Changes in these four elements caused by the siting are termed fiscal impacts. Second, this framework is applied to two communities, Waterford, Connecticut and Plymouth, Massachusetts, which host operating reactors. In each community the ability to raise revenues through the property tax--the prime local revenue source--approximately doubled. As a result both communities chose ultimately to reduce tax rates. Moreover, it appears that the annual revenues raised through the public sector as a result of the reactor siting exceeded income changes that resulted from increased local employment associated with each reactor's operation. It therefore appears that for these two towns, the primary economic impact occurred through the public sector. The report concludes with suggestions for further research into local fiscal and economic effects associated with power reactor siting

  16. Performance model to assist solar thermal power plant siting in northern Chile based on backup fuel consumption

    Energy Technology Data Exchange (ETDEWEB)

    Larrain, Teresita; Escobar, Rodrigo; Vergara, Julio [Departamento de Ingenieria Mecanica y Metalurgica, Pontificia Universidad Catolica de Chile, Vicuna Mackenna 4860, Macul, Santiago (Chile)

    2010-08-15

    In response to environmental awareness, Chile introduced sustainability goals in its electricity law. Power producers must deliver 5% from renewable sources by 2010 and 10% by 2024. The Chilean desert has a large available surface with one of the highest radiation levels and clearest skies in the World. These factors imply that solar power is an option for this task. However, a commercial plant requires a fossil fuel system to backup the sunlight intermittency. The authors developed a thermodynamical model to estimate the backup fraction needed in a 100 MW hybrid -solar-fossil- parabolic trough power plant. This paper presents the model aiming to predicting the performance and exploring its usefulness in assisting site selection among four locations. Since solar radiation data are only available in a monthly average, we introduced two approaches to feed the model. One data set provided an average month with identical days throughout and the other one considered an artificial month of different daylight profiles on an hourly basis for the same monthly average. We recommend a best plant location based on minimum fossil fuel backup, contributing to optimal siting from the energy perspective. Utilities will refine their policy goals more closely when a precise solar energy data set becomes available. (author)

  17. Independent verification in operations at nuclear power plants: Summaries of site visits

    International Nuclear Information System (INIS)

    Donderi, D.C.; Smiley, A.; Ostry, D.J.; Moray, N.P.

    1995-09-01

    A critical review of approaches to independent verification in operations used in nuclear power plant quality assurance programs in other countries was conducted and are detailed in volume 1. This paper is a compilation of the visits to nuclear power plant sites to study independent verification in operations at sites in Canada, USA, Japan, United Kingdom, France and Germany. 3 tabs., 22 figs

  18. Applications of SLAR in nuclear power plant siting: A case history

    Science.gov (United States)

    Siegal, B. S.

    1980-01-01

    Over 10,000 square km of side-looking airborne radar (SLAR) imagery was obtained and analyzed for the siting of the first nuclear power plant in the Republic of the Philippines. The imagery was obtained using the Motorola APS/AN-94D (X-band) real aperture system as part of an overall remote sensing program to site and evaluate potential site regions. Analysis of SLAR images, in conjunction with LANDSAT, color, black and white, and thermal infrared images, provided basic information on structure, relative geochronology, stratigraphy, geomorphology, and ground water, which facilitated field operations and data synthesis.

  19. Feasibility study on floating nuclear power station

    International Nuclear Information System (INIS)

    Kajima, Ryoichi

    1987-01-01

    It is stipulated that nuclear power plants are to be built on solid rock bases on land in Japan. However, there are a limited number of appropriate siting grounds. The Central Research Institute of Electric Power Industry has engaged since 1981 in the studies on the construction technology of power plants, aiming at establishing new siting technology to expand the possible siting areas for nuclear power plants. Underground siting is regarded as a proven technology due to the experience in underground hydroelectric power plants. The technology of siting on quaternary ground is now at the stage of verification. In this report, the outline of floating type offshore/inshore siting technology is introduced, which is considered to be feasible in view of the technical and economical aspects. Three fixed structure types were selected, of which the foundations are fixed to seabed, plant superstructures are above sea surface, and which are floating type. Aiming at ensuring the aseismatic stability of the plant foundations, the construction technology is studied, and the structural concept omitting buoyancy is possible. The most practical water depth is not more than 20 m. The overall plant design, earthquake isolation effect and breakwater are described. (Kako, I.)

  20. Enhancing nuclear power plant safety via on-site mental fatigue management

    Directory of Open Access Journals (Sweden)

    Tsai Ming-Kuan

    2017-01-01

    Full Text Available Nuclear incidents and accidents have occurred at various nuclear power plants. Since some of these incidents and accidents caused by human errors might be preventable, numerous researchers argue that fatigue management for on-site workers is the key, especially for mental fatigue. Thus, this study proposes an approach consisting of two mechanisms. A fatigue monitor could identify the mentally fatigued workers by detecting their brain wave rhythms through a brain-computer interface. For such workers, a fatigue alert would awaken them. If the status of the mentally fatigued workers becomes worse, based on a positioning technique (i.e., wireless networks, this mechanism would alert the nearby workers and managers to deal with this condition. The test results indicate that the proposed approach enhanced the capacity to examine the mentally fatigued workers, ensured the accuracy in locating these workers, and avoided possible nuclear incidents. This study is a useful reference for similar applications in the nuclear industry.

  1. Factors of site selection for nuclear power plants in selected industrial states

    International Nuclear Information System (INIS)

    Hoffmann, L.; Obermair, G.; Ringler, W.; Romahn, B.; Sanders, H.

    1978-01-01

    The range of the tasks within the project consists of working out an optimal catalogue of criteria for the site selection for nuclear power plants; establishing a structured documentation system for the criteria and licensing procedures used by selected industrial countries when selecting sites for nuclear power plants; analyzing and evaluating the documented material with the aim of supplying the basis for decisions concerning land use. The tasks are being realized within a technological ring of data (for the period until 1990, reactor types, cooling, power-heat coupling, special sites, block sizes, local concentration) and a set politico-economical ring of data for the following countries: F.R. Germany, Belgium, Switzerland, Great Britain, Sweden, Denmark, Austria, France, Netherlands, USA, Japan, Yougoslavia. (HP) [de

  2. An integrated approach to site selection for nuclear power plants

    International Nuclear Information System (INIS)

    Hassan, E.M.A.

    1975-01-01

    A method of analysing and evaluating the large number of factors influencing site selection is proposed, which can interrelate these factors and associated problems in an integrated way and at the same time establish a technique for site evaluation. The objective is to develop an integrated programme that illustrates the complexity and dynamic interrelationships of the various factors to develop an improved understanding of the functions and objectives of siting nuclear power plants and would aim finally at the development of an effective procedure and technique for site evaluation and/or comparative evaluation for making rational site-selection decisions. (author)

  3. Maryland Power Plant Siting Project: an application of the ORNL-Land Use Screening Procedure

    International Nuclear Information System (INIS)

    Dobson, J.E.

    1975-01-01

    Since 1974 the Resource Analysis Group in the Regional and Urban Studies Section of the Oak Ridge National Laboratory (ORNL) has been engaged in developing a procedure for regional and local siting analysis known as the ORNL Land Use Screening Procedure (LUSP). This document is the final report of the Maryland Power Plant Siting Project (MPPSP) in which the ORNL LUSP was used to identify candidate areas for power plant sites in northern Maryland. Numerous candidate areas are identified on the basis of four different siting objectives: the minimization of adverse ecologic impact, the minimization of adverse socioeconomic impact, the minimization of construction and operating costs, and a composite of all siting objectives. Siting criteria have been defined for each of these objectives through group processing techniques administered to four different groups of siting specialists. The siting priorities and opinions of each group have been expressed quantitatively and applied to a geographic information system containing 52 variables for each 91.8-acre cell in the northern eight counties of Maryland

  4. Maryland Power Plant Siting Project: an application of the ORNL-Land Use Screening Procedure

    Energy Technology Data Exchange (ETDEWEB)

    Dobson, J.E.

    1975-01-01

    Since 1974 the Resource Analysis Group in the Regional and Urban Studies Section of the Oak Ridge National Laboratory (ORNL) has been engaged in developing a procedure for regional and local siting analysis known as the ORNL Land Use Screening Procedure (LUSP). This document is the final report of the Maryland Power Plant Siting Project (MPPSP) in which the ORNL LUSP was used to identify candidate areas for power plant sites in northern Maryland. Numerous candidate areas are identified on the basis of four different siting objectives: the minimization of adverse ecologic impact, the minimization of adverse socioeconomic impact, the minimization of construction and operating costs, and a composite of all siting objectives. Siting criteria have been defined for each of these objectives through group processing techniques administered to four different groups of siting specialists. The siting priorities and opinions of each group have been expressed quantitatively and applied to a geographic information system containing 52 variables for each 91.8-acre cell in the northern eight counties of Maryland.

  5. An examination of the proposals for the off-site electrical power sources at the Sizewell B PWR

    Energy Technology Data Exchange (ETDEWEB)

    Woodhouse, P. A. [HM Nuclear Installations Inspectorate, London (United Kingdom)

    1986-02-15

    Over the past few years there has been an increase in the attention being given to the adequacy and reliability of alternative sources of power provided to supply safety equipment should off-site electrical sources fail. This paper discusses the rationale of HM Nuclear Installations Inspectorates assessment of the electrical systems proposed for the UK's first Pressurized water Reactor, Sizewell 3. The requirements for on-site sources are given, and a discussion is provided of the NII's Assessment Principles including common mode failure, single failure criterion and reliability targets. Where the assessment has resulted in notifications to the original design the reasons are given. The UK's large interconnected Grid System makes complete losses of off-site power comparatively rare. The potential exists however and this paper shows how the current approach ensures that not only are adequate on-site sources available but also that their siting, maintenance and testing are such that loss of off-site power will not cause an unacceptable risk to the public. (author)

  6. A plan for safety evaluation of tsunamis at the Uljin nuclear power plant site

    International Nuclear Information System (INIS)

    Lee, H. K.; Lee, D. S.

    1999-01-01

    The sites of many nuclear and thermal power plants are located along the coast line to obtain necessary cooling water. Therefore, they are vulnerable to coastal disasters like tsunamis. The safety evaluation on tsunamis of the site of Uljin nuclear power plants was performed with the maximum potential earthquake magnitude and related fault parameters in 1986. But according to the results of recent research, the possibility was suggested that the earthquake which has bigger magnitude than was expected is likely to happen in the seismic gaps near Akita, Japan. Therefore, a plan for safety evaluation of tsunamis at the Uljin nuclear power plants was laid out

  7. Groundwater flow modeling focused on the Fukushima Daiichi Nuclear Power Plant Site

    International Nuclear Information System (INIS)

    Saegusa, Hiromitsu; Onoe, Hironori; Kohashi, Akio; Watanabe, Masahisa

    2015-01-01

    Fukushima Daiichi nuclear power plant of Tokyo Electric Power Company is facing contaminated water issues in the aftermath of the Great East Japan Earthquake on March 11, 2011. The amount of contaminated water is continuously increasing due to groundwater leakage into the underground part of reactor and turbine buildings. Therefore, it is important to understand the groundwater flow conditions at the site and to predict the impact of countermeasures taken for isolating groundwater from the source of the contamination, i.e. the reactor buildings. Installations, such as of land-side and sea-side impermeable walls have been planned as countermeasures. In this study, groundwater flow modeling has been performed to estimate the response of groundwater flow conditions to the countermeasures. From the modeling, groundwater recharge and discharge areas, major groundwater flow direction, inflow rate into underground part of the buildings, and changes in response to implementation of the countermeasures could be reasonably estimated. The results indicate that the countermeasures will decrease the volume of inflow into the underground part of the buildings. This means that the countermeasures will be effective in reducing the discharge volume of contaminated groundwater to ocean. (author)

  8. On the question of a site plan approval procedure for large-scale power stations

    International Nuclear Information System (INIS)

    Roemermann, K.

    1982-01-01

    The author discusses the question whether a plan approval procedure for large-sclae power plants might contribute to shortening the period of time currently used for the licensing of such plants. On the basis of current practice which includes a planning and building permission by virtue of section 35 of the building law (BBauG) together with an approval of plans within the framework of regional planning, the author explains and discusses various models of site plan approval procedures, (a.o. section 38 of the Federal building law). (HP) [de

  9. Land use suitability screening for power plant sites in Maryland

    International Nuclear Information System (INIS)

    Dobson, J.E.

    1975-01-01

    Since 1974 Oak Ridge National Laboratory (ORNL) has been engaged in developing an automated procedure for land use suitability screening. The Nuclear Regulatory Commission has funded the project to aid in the selection of power plant sites in Maryland. Its purpose is to identify candidate areas from which specific candidate sites can be chosen for detailed analyses. The ORNL approach assures that certain key variables are examined empirically for every cell in the study region before candidate sites are selected. Each variable is assigned an importance weight and compatibility score based upon its effect on the economic, social, or ecologic costs associated with construction in a given cell. The weighted scores for each variable are aggregated and output as a suitability score for each cell

  10. On liberation of communities which relies on nuclear power

    International Nuclear Information System (INIS)

    Park, Seung-Joon

    2013-01-01

    Just after the Nuclear Regulation Authority pointed out possible active faults for fracture zones just under the Tsuruga nuclear power station, local government of reactor site criticized this view was mere judgement of small experts group after its short-term field survey and evaluation meeting without enough discussion with nuclear operators. Behavior of local government, which should insist assurance of residents safety at first, seemed inscrutable and the industrial and financial structure of communities dependent on nuclear power should be clarified. Accident affected costs of nuclear power station estimated in the past were far beyond several trillion yen but local residents of reactor site used to believe accident risk might be negligible because of quite low accident probability estimated by probabilistic safety analysis. Economy of local government of reactor site was dependent on nuclear power. Economic benefits consisted of tax or subsidy income of local governments (financial aspect) and limited employment or grants of residents (economical aspect). Depreciation of relevant nuclear power station varied financial dependency of local government respectively, which could be compensated by local tax subsidy after nuclear power was abolished. Local industry dependent on nuclear power was mostly subcontracted building work or related service industry. Nuclear power phaseout could bring about new employment of residents at reactor site with decommissioning works and introduction of gas-fired thermal power or production center for renewable energy. (T. Tanaka)

  11. Risk analysis of NPP in multi-unit site for configuration of AAC power source

    International Nuclear Information System (INIS)

    Kim, Myung Ki

    2000-01-01

    Because of the difficulties in finding new sites for nuclear power plants, more units are being added to the existing sites. In these multi-unit sites, appropriate countermeasures should be established to cope with the potential station blackout (SBO) accident. Currently, installation of additional diesel generator (DG) is considered to ensure an alternative AC power source, but it has not been decided yet how many DGs should be installed in a multi-unit site. In this paper, risk informed decision making method, which evaluates reliability of electrical system, core damage frequency, and site average core damage frequency, is introduced to draw up the suitable number of DG in multi-unit site. The analysis results show that installing two DGs lowered the site average core damage frequency by 1.4% compared to one DG in six unit site. In the light of risk-informed decisions in regulatory guide 1.174, there is no difference of safety between two alternatives. It is concluded that one emergency diesel generator sufficiently guarantees safety against station blackout of nuclear power plants in multi-unit site. (author)

  12. Evaluation of vibratory ground motion at nuclear power plant sites

    International Nuclear Information System (INIS)

    Hofmann, R.B.; Greeves, J.T.

    1978-01-01

    The evaluation of vibratory ground motion at nuclear power plant sites requires the cooperative effort of scientists and engineers in several disciplines. These include seismology, geology, geotechnical engineering and structural engineering. The Geosciences Branch of the NRC Division of Site Safety and Environmental Analysis includes two sections, the Geology/Seismology Section and the Geotechnical Engineering Section

  13. A comparison between dispersed nuclear power plants and a nuclear energy center at a hypothetical site on Kentucky Lake, Tennessee. Vol. III. Environmental considerations

    International Nuclear Information System (INIS)

    Fitzpatrick, F.C.; Gray, D.D.; Hyndman, J.R.; Sisman, O.; Suffern, J.S.; Tyrrell, P.A.; West, D.C.

    1976-02-01

    The thermal, ecological, and social impacts of a 40-reactor NEC are compared to impacts from four 10-reactor NECs and ten 4-reactor power plants. The comparison was made for surrogate sites in western Tennessee. The surrogate site for the 40-reactor NEC is located on Kentucky Lake. A layout is postulated for ten clusters of four reactors each with 2.5-mile spacing between clusters. The plants use natural-draft cooling towers. A transmission system is proposed for delivering the power (48,000 MW) to five load centers. Comparable transmission systems are proposed for the 10-reactor NECs and the 4-reactor dispersed sites delivering power to the same load centers.

  14. A means to a cleaner environment: energy efficient platinum-containing fuel cells to be introduced commercially in the early 1990s

    Energy Technology Data Exchange (ETDEWEB)

    Anon,

    1991-01-01

    The twelfth National Fuel Cell Seminar held in Phoenix, Arizona, U.S.A. from 26th to 28th November 1990, was attended by 450 delegates from 17 countries, representing both developers and potential users worldwide. ''Fuel Cells - An Answer to a Cleaner Environment'' was the key theme running throughout the conference. This was strongly linked to the firm belief that fuel cells would make an important contribution to the world's energy needs over the next ten years as economically viable fuel cell power plants become commercialised. The conference heard that platinum containing phosphoric acid fuel cells (PAFC) are soon to be produced on a commercial basis. Both Fuji and Toshiba announced that they had opened PAFC production facilities in Japan during 1990. The key progress regarding development of Proton Exchange Membrane Fuel Cells (PEMFC) was the announcement of a U.S. Government sponsored programme, to be led to General Motors, to produce a PEMFC powered motor vehicle. The conference reflected the growing extent of the multi-national collaborations that are now underway to develop fuel cell technologies. (author).

  15. Liability for on-site nuclear property damage

    International Nuclear Information System (INIS)

    Neems, H.J.

    2000-01-01

    Typically, liability for on-site property addressed in contracts between operator and its suppliers. Nuclear power plant operators ordinarily protect themselves against risk of nuclear damage to on-site property by insurance. Nuclear liability laws do not specifically address liability for nuclear damage to on-site property. Nuclear plant owners should address risk of damage to on-site property when developing risk management program

  16. Political Participation and Power Relations in Egypt: The Scope of Newspapers and Social Network Sites

    Directory of Open Access Journals (Sweden)

    Mostafa Shehata

    2017-05-01

    Full Text Available The political use of media in Egypt post-2011 revolution brought about drastic transformations in political activism and power structures. In the context of communication power theory, this article investigates the effects of newspapers and social network sites on political participation and political power relations. The research employed a mixed methodology, comprised of a survey of 527 Egyptian youth and semi-structured interviews of 12 political activists and journalists. The results showed a significant relationship between reading newspapers and youth’s political participation, but not between using social network sites and political participation. In addition, newspapers and social network sites were platforms for a series of conflicts and coalitions that emerged between pro- and anti-revolution actors. Despite the importance of social network sites as key tools for informing and mobilizing the public, they eventually failed to empower new political actors, and this was because old actors, supported by newspapers and other mainstream media, managed to obstruct the new actors’ progress.

  17. American National Standard: for facilities and medical care for on-site nuclear-power-plant radiological emergencies

    International Nuclear Information System (INIS)

    Anon.

    1979-01-01

    This standard provides guidance for first aid during an emergency and for initial medical care of those persons on-site who are overexposed to penetrating radiation (irradiated). It also provides guidance for medical care of persons contaminated with radioactive material or radionuclides who may also be irradiated or injured as a result of an accident at a nuclear power plant. It provides recommendations for facilities, supplies, equipment, and the extent of care both on-site where first aid and initial care may be provided and off-site at a local hospital where further medical and surgical care may be provided. This initial care continues until either the patient is released or admitted, or referred to another, possibly distant, medical center for definitive care. Recommendations are also provided for the transportation of patients and the training of personnel. Recommendations for specialized care are considered to be beyond the scope of this standard on emergency medical care; however, since emergency and specialized care are related, a brief discussion of specialized care is provided in the Appendix

  18. New safety standards of nuclear power station with no requirements of site evaluation. No public dose limit published with possible inappropriateness of reactor site

    International Nuclear Information System (INIS)

    Takitani, Koichi

    2013-01-01

    Nuclear Regulation Authority was preparing new safety standards in order to aim at starting safety reviews of existing nuclear power station in July 2013. This article commented on issues of major accident, which was defined as severely damaged core event. Accumulated dose at the site boundary of the Fukushima Daiichi Nuclear Power Station totaled to about 234 mSv on March just after the accident with rare gas of 500 PBq, iodine 131 of 500 PBq, cesium 134 of 10 PBq and cesium 137 of 10 PBq released to the atmosphere, which was beyond 100 mSv. As measures for preventing containment vessel failure after core severely damaged, filtered venting system was required to be installed for low radiological risk to the public. However filter was not effective to rare gas. Accumulated doses at the site boundary of several nuclear power stations after filtered venting with 100% release of rare gas could be estimated to be 2-37 Sv mostly depending on the site condition, which might be surely greater than 100 mSv. Omitting site evaluation for major accident, which was beyond design basis accident, was great concern. (T. Tanaka)

  19. The evaluation of site characteristics for Guangdong nuclear power plant

    International Nuclear Information System (INIS)

    Zhou Ruming; Wu Dizhong; Yan Zhongmin

    1987-01-01

    This paper gives an account of the features of the site of Guangdong Nuclear Power Plant (GNPP) in general and in particular evaluates the outstanding site characteristics related to nuclear safety and public health. It is composed of two parts: the first part describes the seismo-geologic conditions of the site and the other treats the atmospheric dispersion conditions. It also contains the discussion why the possibility of inhabitancy within 5 km from the exclusion ares boundary would not be affected. (author)

  20. The knowledge-based off-site emergency response system for a nuclear power plant

    International Nuclear Information System (INIS)

    Ho, L.W.; Loa, W.W.; Wang, C.L.

    1987-01-01

    A knowledge-based expert system for a nuclear power plant off-site emergency response system is described. The system incorporates the knowledge about the nuclear power plant behaviours, site environment and site geographic factors, etc. The system is developed using Chinshan nuclear power station of Taipower Company, Taiwan, ROC as a representative model. The objectives of developing this system are to provide an automated intelligent system with functions of accident simulation, prediction and with learning capabilities to supplement the actions of the emergency planners and accident managers in order to protect the plant personnel and the surrounding population, and prevent or mitigate property damages resulting from the plant accident. The system is capable of providing local and national authorities with rapid retrieval data from the site characteristics and accident progression. The system can also provide the framework for allocation of available resources and can handle the uncertainties in data and models

  1. Safety Considerations in the Selection of Nuclear Power Plant Candidate Sites in Johor State, Malaysia

    International Nuclear Information System (INIS)

    Ramli, A.T.; Basri, N.A.; Abu Hanifah, N.Z.H.

    2014-01-01

    Nuclear power is considered as one of the best options for future energy development in Malaysia. Since Malaysia has no experience in nuclear energy generation / production, commissioning the first nuclear power plant needs tremendous effort in various aspects. The most obvious challenges are to ensure the nation’s safety and to handle security issues that may arise from a nuclear power plant site. This paper aims to propose a site for nuclear power plant in Johor State, Malaysia as well as listing the possible safety challenges in the process. The site selection uses the Malaysian Atomic Energy Licensing Board (AELB) guideline document as the main reference, supported by documents from International Atomic Energy Agency (IAEA) and from various countries. Only five site characteristics are chosen as study parameters – geological features and seismic data, air dispersion analysis using meteorological data, population distribution, safety zones and emergency supports. This paper concluded that site number 2 (CS2) at Tanjung Tenggaroh, Mersing is the most suitable area for nuclear power plant in Johor state. It has the least possible risks, safety and security issues. (author)

  2. Safety Considerations in the Selection of Nuclear Power Plant Candidate Sites in Johor State, Malaysia

    Energy Technology Data Exchange (ETDEWEB)

    Ramli, A. T.; Basri, N. A.; Abu Hanifah, N. Z.H., [Department of Physics, Faculty of Science Universiti Teknologi Malaysia Johor (Malaysia)

    2014-10-15

    Nuclear power is considered as one of the best options for future energy development in Malaysia. Since Malaysia has no experience in nuclear energy generation / production, commissioning the first nuclear power plant needs tremendous effort in various aspects. The most obvious challenges are to ensure the nation’s safety and to handle security issues that may arise from a nuclear power plant site. This paper aims to propose a site for nuclear power plant in Johor State, Malaysia as well as listing the possible safety challenges in the process. The site selection uses the Malaysian Atomic Energy Licensing Board (AELB) guideline document as the main reference, supported by documents from International Atomic Energy Agency (IAEA) and from various countries. Only five site characteristics are chosen as study parameters – geological features and seismic data, air dispersion analysis using meteorological data, population distribution, safety zones and emergency supports. This paper concluded that site number 2 (CS2) at Tanjung Tenggaroh, Mersing is the most suitable area for nuclear power plant in Johor state. It has the least possible risks, safety and security issues. (author)

  3. The local economic and social effects of power station siting: anticipated, demonstrated and perceived

    International Nuclear Information System (INIS)

    Glasson, J.

    1980-01-01

    The paper discusses the economic and social effects of power station siting at a local level using material based on the interim research findings from a project commissioned by the Central Electricity Generating Board. The cases for and against power station development are outlined and a review of the actual economic and social effects is presented, drawn from a study of a conventional power station at Drax and a nuclear power station at Sizewell. (U.K.)

  4. Performance Analyses of Renewable and Fuel Power Supply Systems for Different Base Station Sites

    Directory of Open Access Journals (Sweden)

    Josip Lorincz

    2014-11-01

    Full Text Available Base station sites (BSSs powered with renewable energy sources have gained the attention of cellular operators during the last few years. This is because such “green” BSSs impose significant reductions in the operational expenditures (OPEX of telecom operators due to the possibility of on-site renewable energy harvesting. In this paper, the green BSSs power supply system parameters detected through remote and centralized real time sensing are presented. An implemented sensing system based on a wireless sensor network enables reliable collection and post-processing analyses of many parameters, such as: total charging/discharging current of power supply system, battery voltage and temperature, wind speed, etc. As an example, yearly sensing results for three different BSS configurations powered by solar and/or wind energy are discussed in terms of renewable energy supply (RES system performance. In the case of powering those BSS with standalone systems based on a fuel generator, the fuel consumption models expressing interdependence among the generator load and fuel consumption are proposed. This has allowed energy-efficiency comparison of the fuel powered and RES systems, which is presented in terms of the OPEX and carbon dioxide (CO2 reductions. Additionally, approaches based on different BSS air-conditioning systems and the on/off regulation of a daily fuel generator activity are proposed and validated in terms of energy and capital expenditure (CAPEX savings.

  5. The part played by applied geology in nuclear power plant site studies

    International Nuclear Information System (INIS)

    Giafferi, J.L.

    1994-01-01

    Site-related geological problems are one of the constraints affecting the environment of nuclear power plants. The natural features (soil and subsoil) at the nuclear power plant site affect numerous factors in the design, construction and operation of the civil engineering structures. The site geological criteria are not solely restricted to the soil as a static support for the structures. Earth tremors in France are of moderate intensity but the likelihood of their occurrence must nevertheless be taken into account for each site. Studies must concern the geological and seismic features of the region as well as the soil and subsoil configurations and composition in the immediate vicinity of the site in order to determine the physical characteristics of the earthquakes so that the safety of the plant can be guaranteed; in many cases, water tables have also to be taken into consideration. Geologic survey techniques are discussed. 13 figs., 7 refs

  6. Study of decision framework of offshore wind power station site selection based on ELECTRE-III under intuitionistic fuzzy environment: A case of China

    International Nuclear Information System (INIS)

    Wu, Yunna; Zhang, Jinying; Yuan, Jianping; Geng, Shuai; Zhang, Haobo

    2016-01-01

    Highlights: • A novel MCDM framework is applied to assist group decision in OWPS site selection. • The index system consisting of veto and evaluation criteria is constructed. • A case study is carried five sites in coastal areas of Shandong in East China. - Abstract: Offshore wind power projects have been rapidly proposed in China due to policy promotion. Site selection immensely decides the success of any offshore wind power development and is a complex multi-criteria decision making (MCDM) problem. However, canonical MCDM methods tend to fail the site selection process due to the following three problems. Firstly, the compensation problem exists in information processing. Secondly, there exists the problem of incomplete utilization of decision information and information loss in the decision process. Thirdly, the interaction problem in the fuzzy environment is easy to be ignored. To deal with the above problems, this study builds a framework for offshore wind farm site selection decision utilizing Elimination et Choix Traduisant la Realité-III (ELECTRE-III) in the intuitionistic fuzzy environment. First of all, the comprehensive index system of OWPS site selection consisting of veto criteria and evaluation criteria is constructed. Then, the intuitionistic fuzzy set is used in the group decision for the decision makers to express the imperfect knowledge. Moreover, the generalized intuitionistic fuzzy ordered weighted geometric interaction averaging (GIFWGIA) operator is applied to deal with the interaction problem. Together with the likelihood-based valued comparisons, imprecise decision information is reasonably used and information loss problem is rationally avoided. Then a case of China is studied based on the proposed framework, demonstrating the site selection methodology valid and practical. This study implements evaluation method for offshore wind power site selection and also provides a theoretical basis for the development of offshore wind power

  7. Quality assurance during site construction of nuclear power plants

    International Nuclear Information System (INIS)

    1981-01-01

    This Safety Guide provides requirements and recommendations related to the establishment and implementation of a quality assurance programme for the site construction activities at nuclear power plants. These include activities such as fabricating, erecting, installing, handling, storing, cleaning, flushing, inspecting, testing, modifying, repairing, and maintaining

  8. A method for site-dependent planning and its application to the preselection of sites for thermal power plants

    International Nuclear Information System (INIS)

    Friedrich, R.

    1979-01-01

    In the first part of the paper a computer-aided method for dealing with the problems of site-dependent planning is described. By means of the modular program system COPLAN complex conjunction between locally varying data can be performed rapidly and accurately with respect to spatial orientation. The system consists of data input, numerous ways of processing, and graphical representation of the results. The second part shows the application of the system to preselection of sites for thermal power plants. By means of a method analyzing its usefulness, the suitability of each point in (the German Federal State of) Baden-Wuerttemberg as a power plant site is determined. Compared with the currently used methods of preliminary site selection the present method is distinguished by area-covering calculation, the possibility of balancing up advantages and disadvantages, as well as transparency and suitability for being checked up. The paper establishes and considers criteria from the fields of operational economy, safety, ecology, and district planning. The computations are performed for different orders of preference. It is shown that there are regions of sites which are acceptable with respect to a large spectrum of object systems. (orig.) [de

  9. A proposal on siting counterplan of nuclear power plants

    International Nuclear Information System (INIS)

    Sasao, Hitoshi

    1980-01-01

    As for the nuclear power generation in Japan. 21 plants with 14.95 million kW capacity have started the operation in 14 years. It is equivalent to more than 12% of the total capacity of power stations. But the environment around the development of nuclear power generation becomes more and more strict recently, and the formation of the consensus of residents becomes a very large political problem. The lead time from the proposal of construction to the local community to the commencement of operation was 8 years and 1 month in the case of 10 nuclear power stations in operation, but it is extended to 15 years and 6 months in the case of 4 power stations under construction. The prefectures where nuclear power stations are located were seven at the end of 1970, and only three were added during 9 years thereafter. It shows the difficulty of the location of nuclear power stations in new prefectures. In order to attain 78 million kW of nuclear power generation by 1995, the location of 50 million kW must be decided in coming several years in view of the lead time. The progress of the studies in the Atomic Industrial Forum, the strengthening of security system in the sistricts concerned, the formation of open environment for informations, the improvement of the setup concerning the compensation to fishery and others, and the studies on the law concerning the special measures for the districts where nuclear facilities are located are discussed. (Kako, I.)

  10. Siting locally-unwanted facilities: What can be learnt from the location of Italian power plants

    International Nuclear Information System (INIS)

    Garrone, Paola; Groppi, Angelamaria

    2012-01-01

    The reaction of communities to the development of energy facilities is based on the environmental impact of the investment, but it also reflects the ex-ante propensity of residents to engage in collective actions. In this work we have examined the requests of authorization of Italian power producers for new thermal plants with the purpose of testing the efficiency of market-based siting policies. The classical location factors, e.g., infrastructure availability, have been confirmed to play a role, and there is a weak evidence that authorization demands have targeted communities that suffer less environmental damage. However our findings have also revealed that power producers are likely to avoid potentially suitable sites if they host a highly activistic community. The paper also discusses some modifications concerning siting policies that could improve the alignment between community responses and the environmental costs of new energy facilities. - Highlights: ► We model location choices for polluting power plants by Italian producers in 1999–2006. ► The efficiency of market-based siting policies is tested (i.e., plants located where environmental damage is lower). ► More than environmental costs, voice factors prevailed on the location choices. ► We conclude that market-based siting policies does not ensure an efficient outcome. ► Developers and communities relationship may suffer from relevant transaction costs

  11. Sites and social assessment of nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Nemoto, K [Central Research Inst. of Electric Power Industry, Tokyo (Japan)

    1977-09-01

    The sites of nuclear power plants in Japan have two features, first the extreme expectation for regional development because of the selection of depopulated districts for most locations, and the second, apprehensions of local people for two reasons of nuclear power generating techniques which do not plant the roots in society and handling of radioactive materials. In order to cope with these problems, it is necessary to consider that the development plan of the regions around reactor sites must be compiled systematically. Its premise is the ''social assessment'' which estimates the economical and social influences and evaluates the merit and demerit of nuclear power plants prior to the construction. This is of course inevitable. The objects of the assessment may be divided as follows: the human effect to individuals, the institutional effect to local community, the economical effect to region, and the national influence to the whole country. While the developmental action of locations includes the stages of examination, planning, construction and operation, and three location patterns are recognized according to the emphasized function, the improvement of national economy, upgrading of environmental quality, and the most priority in local welfare. In the process of the assessment, the following items may be taken notice that each item requires sometimes the weighting; the pattern to abandon location may exist; positive and negative effects are required to be distributed evenly in a triangle having the apexes each representing one of the above three patterns.

  12. Cooling water in the study of nuclear power plants sites

    International Nuclear Information System (INIS)

    Martinez, J.J.C.

    1990-01-01

    The location of an electric power plant has its limitations as regards the availability of apt sites. The radiosanitary risk, seismic risk and the overload capacity of the ground can be generically enumerated, being the cooling water availability for an electric power plant a basic requirement. Diverse cooling systems may be employed but the aim must always be that thermal contamination in the immediate environment be the least possible. (Author) [es

  13. Dispersion of radioactive material in air and water and consideration of population distribution in site evaluation for nuclear power plants. Safety guide

    International Nuclear Information System (INIS)

    2004-01-01

    The IAEA issues Safety Requirements and Safety Guides pertaining to nuclear power plants and activities in the field of nuclear energy, on the basis of its Safety Fundamentals publication on The Safety of Nuclear Installations. The present Safety Guide, which supplements the Code on the Safety of Nuclear Power Plants: Siting, concerns the effects of a nuclear power plant on the surrounding region and the consideration of population distribution in the siting of a plant. This Safety Guide makes recommendations on how to meet the requirements of the Code on the Safety of Nuclear Power Plants: Siting, on the basis of knowledge of the mechanisms for the dispersion of effluents discharged into the atmosphere and into surface water and groundwater. Relevant site characteristics and safety considerations are discussed. Population distribution, the projected population growth rate, particular geographical features, the capabilities of local transport networks and communications networks, industry and agriculture in the region, and recreational and institutional activities in the region should be considered in assessing the feasibility of developing an emergency response plan. In the selection of a site for a facility using radioactive material, such as a nuclear power plant, account should be taken of any local features that might be affected by the facility and of the feasibility of off-site intervention, including emergency response and protective actions. This is in addition to the evaluation of any features of the site itself that might affect the safety of the facility. This Safety Guide recommends methods for the assessment of regional and local characteristics. This Safety Guide supersedes four earlier IAEA Safety Guides, namely: Atmospheric Dispersion in Nuclear Power Plant Siting (Safety Series No. 50-SG-S3 (1980)). Site Selection and Evaluation for Nuclear Power Plants with Respect to Population Distribution (Safety Series No. 50-SG-S4 (1980)). Hydrological

  14. Dispersion of radioactive material in air and water and consideration of population distribution in site evaluation for nuclear power plants. Safety guide

    International Nuclear Information System (INIS)

    2002-01-01

    The IAEA issues Safety Requirements and Safety Guides pertaining to nuclear power plants and activities in the field of nuclear energy, on the basis of its Safety Fundamentals publication on The Safety of Nuclear Installations. The present Safety Guide, which supplements the Code on the Safety of Nuclear Power Plants: Siting, concerns the effects of a nuclear power plant on the surrounding region and the consideration of population distribution in the siting of a plant. This Safety Guide makes recommendations on how to meet the requirements of the Code on the Safety of Nuclear Power Plants: Siting, on the basis of knowledge of the mechanisms for the dispersion of effluents discharged into the atmosphere and into surface water and groundwater. Relevant site characteristics and safety considerations are discussed. Population distribution, the projected population growth rate, particular geographical features, the capabilities of local transport networks and communications networks, industry and agriculture in the region, and recreational and institutional activities in the region should be considered in assessing the feasibility of developing an emergency response plan. In the selection of a site for a facility using radioactive material, such as a nuclear power plant, account should be taken of any local features that might be affected by the facility and of the feasibility of off-site intervention, including emergency response and protective actions. This is in addition to the evaluation of any features of the site itself that might affect the safety of the facility. This Safety Guide recommends methods for the assessment of regional and local characteristics. This Safety Guide supersedes four earlier IAEA Safety Guides, namely: Atmospheric Dispersion in Nuclear Power Plant Siting (Safety Series No. 50-SG-S3 (1980)); Site Selection and Evaluation for Nuclear Power Plants with Respect to Population Distribution (Safety Series No. 50-SG-S4 (1980)); Hydrological

  15. Pre operational background radiation monitoring around Kudankulam Nuclear Power Project site - a decade long experience

    International Nuclear Information System (INIS)

    Vijayakumar, B.; George, Thomas; Sundara Rajan, P.; Selvi, B.S.; Balamurugan, M.; Pandit, G.G.; Ravi, P.M.; Tripathi, R.M.

    2014-01-01

    Pre-operational environmental background radiation monitoring around nuclear power plants is very important to understand baseline values existing in the site and also to identify any hot spots of naturally occurring high background radiation areas and their sources. These baseline measurements will act as a benchmark for future comparison after the reactors go into operation. The radiation measurements are continued during the operational phase of the plant and the results are compared to see whether there is any impact of the operation of the plant on the environment. A comprehensive background radiation monitoring plan has been in vogue at site from 2004 to meet this objective. This paper describes the different monitoring strategies adopted around Kudankulam Nuclear Power Project site and throws light on the pre operational background radiation levels in the environment

  16. Re-powering and site recycling in a competitive environment

    International Nuclear Information System (INIS)

    Taylor, A.; Kahn, E.P.

    1991-03-01

    Re-powering and site recycling are strategies designed to expand electric generating capacity by using depreciated assets. The resource base for the these strategies is large. By 1995, over 170,000 MW of fossil-fired capacity will be in excess of thirty years old, and approaching the end of its conventional economic lifetime. This paper explores how these assets might be developed using competitive market forces. While some re-powering is being pursued under traditional ratebase regulation, there are four other generic alternatives. These are: (1) utility investment at fixed prices with regulatory pre-approval, (2) utility investment under competitive bidding, (3) utility leasing for private producer development, and (4) utility sale of sites for private producer development. Issues associated with each alternative are explored and illustrated with examples. State regulatory policy will be the critical determinant of whether a market develops for depreciated power plants. Financial incentives will stimulate utilities to re-deploy depreciated assets. This means some form of profit-sharing between customers and shareholders of the grains from asset sales. Different approaches to profit sharing are reviewed. These developments are still in an experimental state, however, and no single approach appears to have emerged as a dominant trend. 36 refs., 1 tab

  17. Evaluation of regulatory processes affecting nuclear power plant early site approval and standardization

    International Nuclear Information System (INIS)

    1983-12-01

    This report presents the results of a survey and evaluation of existing federal, state and local regulatory considerations affecting siting approval of power plants in the United States. Those factors that may impede early site approval of nuclear power plants are identified, and findings related to the removal of these impediments and the general improvement of the approval process are presented. A brief evaluation of standardization of nuclear plant design is also presented

  18. Site preparation works for No.3 plant in Ikata Nuclear Power Station, Shikoku Electric Power Co., Inc

    International Nuclear Information System (INIS)

    Ishihara, Hisashi; Nakajima, Hiroshi; Oshima, Teruhiko

    1986-01-01

    Ikata Power Station is only nuclear power station in Shikoku located at the root of Sadamisaki Peninsula. No.1 plant started the operation in September, 1977, and No.2 plant started the operation in March, 1982. By constructing No.3 plant of 890 MWe output, the total power output will be 2.022 million kW. No.3 plant is installed adjacently to No.1 and No.2 plants on their east side. In this place, the existing facilities of the harbor and others can be effectively utilized, the nature of ground is solid, and the fundamental condition of location is perfect, it is easy to obtain the cooperation of local people as No.1 and No.2 plants have been in operation, and it is advantageous in view of the construction period for the power supply plan. The site preparation works have progressed smoothly since the start in June, 1985. About 100,000 m 2 of the site is created by cutting natural ground, and about 54,000 m 2 is created by sea reclamation. About 5 million m 3 of earth and stone generated by cutting and excavation are utilized for reclamation, revetment and others. The topographic and geological features, sea condition, the outline of geological survey, the layout, and the construction works of revetment, cutting, the creation of substitute seaweed farm, appurtenant works, and the measures for environment preservation are described. (Kako, I.)

  19. Hydrological dispersion of radioactive material in relation to nuclear power plant siting

    International Nuclear Information System (INIS)

    1985-01-01

    This Guide discusses the dispersion of normal and accidental releases of radioactive materials from nuclear power plants into surface water, including the washout of airborne radionuclides, and gives recommendations on information to be collected during the various stages of the siting procedure, a minimum measurement programme and the selection and validation of appropriate mathematical models for predicting dispersion. Guidelines are also provided for the optimal use of models for a specific site situation and for defining the necessary input parameters. Results of existing validation studies are given

  20. Radiation burden of population in nuclear power plant siting

    International Nuclear Information System (INIS)

    Navratil, J.

    The significance is discussed of the determination of the radiobiological consequences of normal operation and design basis accidents in nuclear power plant siting. The basic diagram and brief description is given of the programme for calculating the radiation load of the population in the surroundings of the nuclear power plant. The programme consists of two subprogrammes, i.e., the dispersion of radioactive gases (for normal operation and for accidents), the main programme for the determination of biological consequences and one auxiliary programme (the distribution of the population in the surroundings of the power plant). The four most important types of exposure to ionizing radiation are considered, namely inhalation, external irradiation from a cloud, ingestion (water, milk, vegetables), external irradiation from the deposit. (B.S.)

  1. Assessment of earthquake-induced tsunami hazard at a power plant site

    International Nuclear Information System (INIS)

    Ghosh, A.K.

    2008-01-01

    This paper presents a study of the tsunami hazard due to submarine earthquakes at a power plant site on the east coast of India. The paper considers various sources of earthquakes from the tectonic information, and records of past earthquakes and tsunamis. Magnitude-frequency relationship for earthquake occurrence rate and a simplified model for tsunami run-up height as a function of earthquake magnitude and the distance between the source and site have been developed. Finally, considering equal likelihood of generation of earthquakes anywhere on each of the faults, the tsunami hazard has been evaluated and presented as a relationship between tsunami height and its mean recurrence interval (MRI). Probability of exceedence of a certain wave height in a given period of time is also presented. These studies will be helpful in making an estimate of the tsunami-induced flooding potential at the site

  2. Improvement of Off-site Dose Assessment Code for Operating Nuclear Power Plant

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Juyub; Kim, Juyoul; Shin, Kwangyoung [FNC Technology Co. Ltd., Yongin (Korea, Republic of); You, Songjae; Moon, Jongyi [Korea Institute of Nuclear Safety, Daejeon (Korea, Republic of)

    2014-05-15

    XOQDOQ code which calculates atmospheric Dispersion factor was included into INDAC also. A research on the improvement of off-site dose assessment system for an operating nuclear power plant was performed by KINS in 2011. As a result, following improvements were derived: - Separation of dose assessment for new and existing facilities - Update of food ingestion data - Consideration of multi-unit operation and so on In order to reflect the results, INDAC is under modification. INDAC is an integrated dose assessment code for an operating nuclear power plant and consists of three main modules: XOQDOQ, GASDOS and LIQDOS. The modules are under modification in order to improve the accuracy of assessment and usability. Assessment points for multi-unit release can be calculated through the improved code and the method on dose assessment for multi-unit release has been modified, so that the dose assessment result of multi-unit site becomes more realistic by relieving excessive conservatism. Finally, as the accuracy of calculation modules has been improved, the reliability of dose assessment result has been strengthened.

  3. The Potential of Concentrated Solar Power for Remote Mine Sites in the Northern Territory, Australia

    Directory of Open Access Journals (Sweden)

    M. H. Baig

    2015-01-01

    Full Text Available The Northern Territory (NT is among the regions in Australia and the world with the highest solar radiation intensities. The NT has many mine sites which consume significant amount of fossil fuel with consequent greenhouse gas (GHG emissions. The environmental concern related to the fossil fuel consumption and availability of immense solar energy resource in the NT open the possibilities for considering the provision of power to the mining sites using proven solar technologies. Concentrating solar power (CSP systems are deemed as the potential alternatives to current fossil fuel based generating systems in mining industry in the NT. The finding is based on consideration of the major factors in determining the feasibility of CSP system installation, with particular reference to the NT mine sites. These are plant design requirements, climatic, environmental, and other requirements, and capital and operating costs. Based on these factors, four mine sites have been identified as having the potential for CSP plants installation. These are McArthur River Mine, Ranger Mine, Northern Territory Gold Mines, and Tanami Operations. Each site could be served by one CSP plant to cater for the needs of mining operation and the local communities.

  4. Satellite power system (SPS). Rectenna siting: availability and distribution of nominally eligible sites

    Energy Technology Data Exchange (ETDEWEB)

    1980-11-01

    Siting of 60 ground receiving stations (rectennas) for the SPS may pose a problem due to the large area per rectenna (15,000 hectares, 38,000 acres) and numerous siting constraints. This study analyzes areas potentially eligible for rectenna sites by mapping, at a national scale, those conditions which would preclude rectenna construction. These exclusion variables which reflect restricted lands, topography, safety, national policy and electromagnetic (microwave) effects, have been computer encoded and tabulated. Subsequent analysis of the nine electric power planning regions that make up the contiguous states indicate an apparently adequate number of nominally eligible sites in all regions in comparison to projected electrical generation. Eligibility in this context means only that areas were not excluded in this national level analysis; more detailed investigation may reveal purely local constraints or smaller scale exclusions. A second major qualification relates to small isolated eligible areas. Eliminating individual eligible clusters with less than nine times the area of one rectenna eliminates much of the Eastern US; a four-to-one adjacent eligible area test poses no such problem. An independant study of the placement of 60 nominal sites in relation to projected load centers reveals that, even with modest transmission distances, the supply of eligible areas is not a key constraint, except perhaps in the Mid-Atlantic (Electric Reliability) Council Region. Even when several less critical (potential) exclusions are considered, more than 19% of the US is eligible; every region except Mid-Atlantic has at least 50 times an many eligible sites as are required.

  5. Remote sensing for nuclear power plant siting

    International Nuclear Information System (INIS)

    Siegal, B.S.; Welby, C.W.

    1981-01-01

    Remote sensing techniques enhance the selection and evaluation process for nuclear power plant siting. The principal advantage is the synoptic view which improves recognition of linear features, possibly indicative of faults. The interpretation of such images, in conjunction with seismological studies, also permits delineation of seismo-tectonic provinces. In volcanic terrains, geomorphic-age boundaries can be delineated and volcanic centers identified, providing necessary guidance for field sampling and regional model derivation. The use of such techniques is considered for studies in the Philippines, Mexico, and Greece. 5 refs

  6. Rocketdyne Propulsion and Power DOE Operations annual site environmental report 1997

    International Nuclear Information System (INIS)

    Robinson, K.S.

    1998-01-01

    This annual report discusses environmental monitoring at two manufacturing and test sites operated in the Los Angeles area by Rocketdyne Propulsion and Power of Boeing North American, Inc. These are identified as Area 4 of the SSFL and the De Soto site. These sites have been used for research and development (R and D), engineering, and testing in a broad range of technical fields primarily in energy research and nuclear reactor technology. The De Soto site had research and development laboratories involved with nuclear research. This work was terminated in 1995 and only D and D activities will have potential for impact on the environment. Since 1956, Area 4 has been used for work with nuclear materials, including fabricating nuclear reactor fuels, testing nuclear reactors, and dissembling used fuel elements. This work ended in 1988 and subsequent efforts have been directed toward decommissioning and decontamination of the former nuclear facilities. The primary purpose of this report is to present information on environmental and effluent monitoring of DOE-sponsored activities to the regulatory agencies responsible for oversight. Information presented here concentrates on Area 4 at SSFL, which is the only area at SSFL where DOE operations were performed

  7. Risk-benefit evaluation of nuclear power plant siting

    International Nuclear Information System (INIS)

    Miettinen, J.; Savolainen, I.; Silvennoinen, P.

    1976-01-01

    An assessment scheme is described for the risk-benefit analyses of nuclear power versus conventional alternatives. Given the siting parameters for the proposed nuclear plant an economic comparison is made with the most advantageous competitive conventional production scenario. The economic benefit is determined from the differential discounted annual energy procurement cost as a function of the real interest rate and amortization time. The risk analysis encompasses the following factors: radiation risks in normal operation, reactor accident hazards and economic risks, atmospheric pollutants from the conventional power plants, and fuel transportation. The hazards are first considered in terms of probabilistic dose distributions. In the second stage risk components are converted to a compatible form where excess mortality is used as the risk indicator. Practical calculations are performed for the power production alternatives of Helsinki where district heat would be extracted from the nuclear power plant. At the real interest rate of 10% and amortization time of 20 yr the 1000 MW(e) nuclear option is found to be Pound9.1 m per yr more economic than the optimal conventional scenario. Simultaneously the nuclear alternative is estimated to reduce excess mortality by 2 to 5 fatal injuries annually. (author)

  8. Study of seismic design bases and site conditions for nuclear power plants

    International Nuclear Information System (INIS)

    1980-04-01

    This report presents the results of an investigation of four topics pertinent to the seismic design of nuclear power plants: Design accelerations by regions of the continental United States; review and compilation of design-basis seismic levels and soil conditions for existing nuclear power plants; regional distribution of shear wave velocity of foundation materials at nuclear power plant sites; and technical review of surface-founded seismic analysis versus embedded approaches

  9. Study of seismic design bases and site conditions for nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    1980-04-01

    This report presents the results of an investigation of four topics pertinent to the seismic design of nuclear power plants: Design accelerations by regions of the continental United States; review and compilation of design-basis seismic levels and soil conditions for existing nuclear power plants; regional distribution of shear wave velocity of foundation materials at nuclear power plant sites; and technical review of surface-founded seismic analysis versus embedded approaches.

  10. Numerical Simulation of Groundwater Flow at Kori Nuclear Power Plant Site

    International Nuclear Information System (INIS)

    Sohn, Wook; Sohn, Soon Whan; Chon, Chul Min; Kim, Kue Youn

    2010-01-01

    Recently, the understanding of hydrogeological characteristics of nuclear power sites is getting more importance with increasing public concerns over the environment since such understanding is essential for an environmentally friendly operation of plants. For such understanding, the prediction of groundwater flow pattern onsite plays the most critical role since it is the most dynamic of the factors to be considered. In this study, the groundwater flow at the Kori Plant 1 site has been simulated numerically with aim of providing fundamental information needed for improving the understanding of the hydrogeological characteristics of the site

  11. On the spatial hedging effectiveness of German wind power futures for wind power generators

    DEFF Research Database (Denmark)

    Christensen, Troels Sønderby; Pircalabu, Anca

    2018-01-01

    The wind power futures recently introduced on the German market fill the gap of a standardized product that addresses directly the volume risk in wind power trading. While the German wind power futures entail risk-reducing benefits for wind power generators generally speaking, it remains unclear...... the extent of these benefits across wind farms with different geographical locations. In this paper, we consider the wind utilization at 31 different locations in Germany, and for each site, we propose a copula model for the joint behavior of the site-specific wind index and the overall German wind index....... Our results indicate that static mixture copulas are preferred to the stand-alone copula models usually employed in the economic literature. Further, we find evidence of asymmetric dependence and upper tail dependence. To quantify the benefits of wind power futures at each wind site, we perform...

  12. Technology overview: assessment of social values in thermal power plant siting, social impact methodology evaluation

    International Nuclear Information System (INIS)

    Anon.

    1978-01-01

    A methodology was developed to facilitate the selection of favorable thermal power plant site and design alternatives from the community perspective. A two-stage, multicriteria decision technique was employed to combine technical assessments of effects of the proposed site/design alternatives with corresponding community values. In the first stage, submodels are used to develop indices of plant impact on each of ten decision criteria. These criteria include effects on aesthetics, water quality, cost of power, air quality, ecology, social quality, local economy, recreational opportunities, cultural resources, and human health and safety. In the second stage, each of the impact indices is weighted by corresponding community values and then summed to provide an overall index of plant acceptability

  13. Earthquakes and associated topics in relation to nuclear power plant siting

    International Nuclear Information System (INIS)

    1979-01-01

    The main emphasis of the Guide is on the determination of the design basis ground motions for the nuclear power plant and on the determination of the potential for surface faulting at the site. Additionally, the Guide treats initiation of seismically induced flooding and the ground failure phenomena of subsidence and collapse. Volcanic activity is not dealt with except in connection with tsunamis. The methods and procedures discussed in this Guide should be taken as the basis for the design of seismically safe nuclear power plants and are primarily suited to areas of high and medium seismicity; for areas of low seismicity the Guide may not be applicable in its entirety and may need to be supplemented by other methods

  14. Application of NUSS siting guidelines for nuclear power plants in India

    International Nuclear Information System (INIS)

    Soman, S.D.; Sarma, T.P.

    1985-01-01

    The nuclear power profile in India envisages generation of 10,000 MW(e) by the year 2000. In the selection of sites for this purpose, safety considerations based on the NUSS siting code were developed, keeping in mind the conditions existing in the country. The paper reviews the similarity of approach between NUSS documents on siting and guidelines being adopted in India, given different site characteristics such as population distribution, seismicity, flooding and external man-induced events. However, in a few aspects, difficulties were experienced in adopting NUSS requirements in toto. This was primarily because of differences in the national systems, lack of instrumentally recorded data, and an inadequate scientific investigational base in fields such as seismology and hydrology. This paper discusses two such examples and how the difficulties have been overcome in arriving at guidelines which would be in the same spirit as the siting recommendations of the NUSS programme. The first example relates to identification of capable fault and the second concerns the flooding arising out of failure of upstream dams. In addition, the inadequacy and inappropriateness of some of the models given in the NUSS siting guides are also discussed. The paper also considers the current status of accident evaluation of PHWR (235 MW(e)) units being built in the country. In the light of this evaluation, the siting criteria and the emergency measures planned at the sites are reviewed for their compatibility. The emergency measures planned take full cognizance of the ICRP recommendations related to the protection of population in the event of a major reactor accident. (author)

  15. Losses of off-site power at U.S. nuclear power plants - all years through 1985. Final report, May 1986

    International Nuclear Information System (INIS)

    1986-05-01

    This report provides a database describing losses of all off-site power at U.S. nuclear plants. It includes all years through 1985. During 1985 there were 2 losses lasting longer than 30 minutes for 0.031 losses per site year and 4 shorter losses for 0.063 losses per site year, giving a total of 0.094 losses per site year. This is in line with the 1984 total of 0.089 losses per site year, and with the comparable numbers for all years through 1985 of 0.038 losses per site year of longer than 30 minutes, 0.045 for shorter losses and a total of 0.083. (author)

  16. Quantitative comparison of the nuclear power plant sites in the United Kingdom

    Energy Technology Data Exchange (ETDEWEB)

    Shaw, J; Sina, A M [Queen Mary Coll., London (UK). Dept. of Nuclear Engineering

    1976-01-01

    A probabilistic method is described for a comparison of nuclear power plant sites in the United Kingdom, which evaluates quantitatively the sites in terms of favourability, by taking into account the real term meteorological conditions, i.e. wind direction, wind speed, and stability distributions, and also the population distribution around the cities. A 'site safety quality factor' is obtained for each site and is used to compare the favourability of each site with respect to releases of radioactivity. The quality factor corresponds to the average number of persons that would be exposed to the specified relative concentration averaged over all weather conditions. The sites compared are Berkeley, Bradwell, Dungeness, Hartlepool, Heysham, Oldbury, Sizewell, and Wylfa.

  17. Feasibility Study of Biopower in East Helena, Montana. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    Energy Technology Data Exchange (ETDEWEB)

    Moriarty, K.

    2013-02-01

    The U.S. Environmental Protection Agency (EPA) developed the RE-Powering America's Land initiative to reuse contaminated sites for renewable energy generation when aligned with the community's vision for the site. The former American Smelting and Refining Company (Asarco) smelter in East Helena, Montana, was selected for a feasibility study under the initiative. Biomass was chosen as the renewable energy resource based on the wood products industry in the area. Biopower was selected as the technology based on Montana's renewable portfolio standard (RPS) requiring utilities to purchase renewable power.

  18. Green Certificates and Market Power on the Nordic Power Market

    International Nuclear Information System (INIS)

    Bergman, Lars; Amundsen, Eirik S

    2007-06-01

    In Sweden a market for Tradable Green Certificates (TGCs) was introduced in 2003. The purpose was to stimulate investments in electricity generation based on renewable energy sources without using direct governmental subsidies to renewable energy. More precisely the aim is to create a market where different types of renewable electricity can compete on equal terms, thus relieving governments and public agencies from being directly involved in power industry investment decisions. The purpose of this study is to elucidate under which circumstances, how, and to what extent market power in the TGC market can be used to affect the entire electricity market. There are basically two reasons for being concerned with market power in TGC markets. The first is the fact that the industry average cost curve for 'green' electricity tends to be upward sloping. This is because the cost of wind power, the main source of green electricity, depends on the location of the power plants, and that the availability of first rate sites that do not involve sizable investments in new transmission and network infrastructure, is limited. The situation is similar for environmentally friendly hydro power, and, to some extent, for other types of 'green' electricity. Thus, given the state of technology and an upper cost limit, there is a maximum amount of 'green' electricity that can be produced within a country. This means that some generators, by getting access to the suitable sites, will become dominating producers of 'green' electricity and thus may be able to exercise market power in the TGC market. The second reason for being concerned with market power in a TGC market is that, as a result of the percentage requirement, the withdrawal of a given number of TGCs from the market forces a much larger reduction of electricity consumption. Thus relatively modest exercise of market power in the TGC market may have a significant impact on the price of electricity and the allocation of resources in

  19. Enhancement of the REMix energy system model. Global renewable energy potentials, optimized power plant siting and scenario validation

    Energy Technology Data Exchange (ETDEWEB)

    Stetter, Daniel

    2014-04-10

    As electricity generation based on volatile renewable resources is subject to fluctuations, data with high temporal and spatial resolution on their availability is indispensable for integrating large shares of renewable capacities into energy infrastructures. The scope of the present doctoral thesis is to enhance the existing energy modelling environment REMix in terms of (i.) extending the geographic coverage of the potential assessment tool REMix-EnDaT from a European to a global scale, (ii.) adding a new plant siting optimization module REMix-PlaSMo, capable of assessing siting effects of renewable power plants on the portfolio output and (iii.) adding a new alternating current power transmission model between 30 European countries and CSP electricity imports from power plants located in North Africa and the Middle East via high voltage direct current links into the module REMix-OptiMo. With respect to the global potential assessment tool, a thorough investigation is carried out creating an hourly global inventory of the theoretical potentials of the major renewable resources solar irradiance, wind speed and river discharge at a spatial resolution of 0.45°x0.45°. A detailed global land use analysis determines eligible sites for the installation of renewable power plants. Detailed power plant models for PV, CSP, wind and hydro power allow for the assessment of power output, cost per kWh and respective full load hours taking into account the theoretical potentials, technological as well as economic data. The so-obtined tool REMix-EnDaT can be used as follows: First, as an assessment tool for arbitrary geographic locations, countries or world regions, deriving either site-specific or aggregated installable capacities, cost as well as full load hour potentials. Second, as a tool providing input data such as installable capacities and hourly renewable electricity generation for further assessments using the modules REMix-PlasMo and OptiMo. The plant siting tool

  20. Enhancement of the REMix energy system model. Global renewable energy potentials, optimized power plant siting and scenario validation

    International Nuclear Information System (INIS)

    Stetter, Daniel

    2014-01-01

    As electricity generation based on volatile renewable resources is subject to fluctuations, data with high temporal and spatial resolution on their availability is indispensable for integrating large shares of renewable capacities into energy infrastructures. The scope of the present doctoral thesis is to enhance the existing energy modelling environment REMix in terms of (i.) extending the geographic coverage of the potential assessment tool REMix-EnDaT from a European to a global scale, (ii.) adding a new plant siting optimization module REMix-PlaSMo, capable of assessing siting effects of renewable power plants on the portfolio output and (iii.) adding a new alternating current power transmission model between 30 European countries and CSP electricity imports from power plants located in North Africa and the Middle East via high voltage direct current links into the module REMix-OptiMo. With respect to the global potential assessment tool, a thorough investigation is carried out creating an hourly global inventory of the theoretical potentials of the major renewable resources solar irradiance, wind speed and river discharge at a spatial resolution of 0.45°x0.45°. A detailed global land use analysis determines eligible sites for the installation of renewable power plants. Detailed power plant models for PV, CSP, wind and hydro power allow for the assessment of power output, cost per kWh and respective full load hours taking into account the theoretical potentials, technological as well as economic data. The so-obtined tool REMix-EnDaT can be used as follows: First, as an assessment tool for arbitrary geographic locations, countries or world regions, deriving either site-specific or aggregated installable capacities, cost as well as full load hour potentials. Second, as a tool providing input data such as installable capacities and hourly renewable electricity generation for further assessments using the modules REMix-PlasMo and OptiMo. The plant siting tool

  1. Dose commitments due to radioactive releases from nuclear power plant sites in 1989

    International Nuclear Information System (INIS)

    Baker, D.A.

    1993-02-01

    Population and individual radiation dose commitments have been estimated from reported radionuclide releases from commercial power reactors operating during 1989. Fifty-year dose commitments for a one-year exposure from both liquid and atmospheric releases were calculated for four population groups (infant, child, teen-ager and adult) residing between 2 and 80 km from each of 72 reactor sites. This report tabulates the results of these calculations, showing the dose commitments for both water and airborne pathways for each age group and organ. Also included for each of the sites is an estimate of individual doses which are compared with 10 CFR Part 50, Appendix I design objectives. The total collective dose commitments (from both liquid and airborne pathways) for each site ranged from a high of 14 person-rem to a low of 0.005 person-rem for the sites with plants in operation and producing power during the year. The arithmetic mean was 1.2 person-rem. The total population dose for all sites was estimated at 84 person-rem for the 140 million people considered at risk. The individual dose commitments estimated for all sites were below the Appendix I design objectives

  2. Dose commitments due to radioactive releases from nuclear power plant sites in 1989

    Energy Technology Data Exchange (ETDEWEB)

    Baker, D.A. (Pacific Northwest Lab., Richland, WA (United States))

    1993-02-01

    Population and individual radiation dose commitments have been estimated from reported radionuclide releases from commercial power reactors operating during 1989. Fifty-year dose commitments for a one-year exposure from both liquid and atmospheric releases were calculated for four population groups (infant, child, teen-ager and adult) residing between 2 and 80 km from each of 72 reactor sites. This report tabulates the results of these calculations, showing the dose commitments for both water and airborne pathways for each age group and organ. Also included for each of the sites is an estimate of individual doses which are compared with 10 CFR Part 50, Appendix I design objectives. The total collective dose commitments (from both liquid and airborne pathways) for each site ranged from a high of 14 person-rem to a low of 0.005 person-rem for the sites with plants in operation and producing power during the year. The arithmetic mean was 1.2 person-rem. The total population dose for all sites was estimated at 84 person-rem for the 140 million people considered at risk. The individual dose commitments estimated for all sites were below the Appendix I design objectives.

  3. Evaluation of Radiological Impacts on the Operating Kartini Reactor and Natural Radioactivity of the Site Plan of Nuclear Power Plant Area

    International Nuclear Information System (INIS)

    Yazid, M; Sutresna, G; Sulistyono, A; Ngasifudin

    1996-01-01

    This radiological impacts evaluation covered of radioactivity in water, soil, grass, air samples and ambient gamma radiation that have been carried out in the Kartini reactor area and in the site plan of nuclear power plan are at Ujung Lemah Abang, Jepara, Central Java. The aim of this research was to determine that radiological impacts in the environment around the Kartini reactor compared to natural radioactivity for site plan of nuclear power plan area. The radioactivity in the water, soil and grass samples ware measured by low background beta counting system and were identified by low background gamma spectrometer. The radioactivity in the air samples was measured by beta portable counting system and the ambient gamma radiation was measured by portable high pressurized ionization chamber model RSS-112 Reuther-Stokes. The reactor data measurement was compared to the site plan of nuclear power plant area data for evaluation of radiological impacts on the operating reactor. From the evaluation and comparison can be concluded there are no indication of the radionuclide release from the reactor operation. The average radiactivity in the water, soil grass and air sample from the reactor area were between 0.17 - 0.61 Bq/1; 0,47 - 0,74 Bq/g; 4.43 - 4.60 Bq/g.ash and 49.53 - 70.90 x 10 Bq/cc. The average radioactivity of those sample from the nuclear power plant area were between 0.06-0.90 Bq/I; 0.02-0.86 Bq/g; 1.68-8.07 Bq/g.ash and 65.0-152.3 x 10 Bq/cc. The ambient gamma radiation were between 6.9-36.7 urad/h for the reactor area and 6.8-19.2 urad/h for the nuclear power plant area

  4. Underground siting of nuclear power plants

    International Nuclear Information System (INIS)

    Pinto, S.; Telleschi, P.

    1978-10-01

    Two of the main underground siting alternatives, the rock cavity plant and the pit siting, have been investigated in detail and two layouts, developed for specific sites, have been proposed. The influence of this type of siting on normal operating conditions and during abnormal occurences have been investigated. (Auth.)

  5. Assessment of economic factors affecting the satellite power system. Volume 2: The systems implications of rectenna siting issues

    Science.gov (United States)

    Chapman, P. K.; Bugos, B. J.; Csigi, K. I.; Glaser, P. E.; Schimke, G. R.; Thomas, R. G.

    1979-01-01

    The feasibility was evaluated of finding potential sites for Solar Power Satellite (SPS) receiving antennas (rectennas) in the continental United States, in sufficient numbers to permit the SPS to make a major contribution to U.S. generating facilities, and to give statistical validity to an assessment of the characteristics of such sites and their implications for the design of the SPS system. It is found that the cost-optimum power output of the SPS does not depend on the particular value assigned to the cost per unit area of a rectenna and its site, as long as it is independent of rectenna area. Many characteristics of the sites chosen affect the optimum design of the rectenna itself.

  6. Minutes and group memories from all NERBC/USGS-RPA power plant siting task force meetings through October, 1980. Appendix

    International Nuclear Information System (INIS)

    1980-11-01

    The New England River Basins Commission/United States Geological Survey-Resource Planning Analysis Office (NERBC/USGS-RPA) Power Plant Siting Task Force has formerly met seven times between July 1979 and August 1980. At the first meeting on July 13, 1979, the members agreed that there were many problems with the current process of selecting sites for power plants in New England, and that they would work by consensus to find solutions for these problems. At the second meeting on October 19, 1979, NERBC staff presented information on the site selection and approval processes in New England. The Task Force began a preliminary discussion of problems in these processes, and agreed that the initial scope of work of the Task Force would focus on issues in site selection. At the third meeting on January 18, 1980, the Task Force began initial discussions in three areas: imperfections in the site selection process, stakeholders in the site selection process, and principles to guide solutions to the problems in site selection. On March 7, 1980, at the fourth meeting, the Task Force continued discussions on imperfections, stakeholders, and principles. At the fifth meeting on May 2, 1980, the Task Force reached a wide range of agreements on the difficulties encountered in the site selection process and on the principles guiding problem solving in site selection. At the sixth meeting on May 29, 1980, the Task Force focused on solutions to the problems identified at earlier meetings. Groups of Task Force members constructed eight different scenarios describing alternative power plant siting processes. In July 1980, the Task Force met for the seventh time and refined the eight scenarios, paring them down to five. An attempt was made to develop two scenarios using the common elements from the five. One of these two graphic models was based on government involvement in the site selection process, and the other was based on stakeholder involvement in the process

  7. Preparation of polymeric aluminium ferric chloride from bauxite tailings

    Directory of Open Access Journals (Sweden)

    Ma D.

    2013-01-01

    Full Text Available Bauxite tailings are the main solid wastes in the ore dressing process. The Al2O3 and Fe2O3 contents in bauxite tailings can reach 50% and 13% respectively. The present study proposed a feasible method to use bauxite tailings to prepare polymeric aluminium ferric chloride (PAFC, a new composite inorganic polymer for water purification. Bauxite tailings roasted reacting with hydrochloric acid under air, pickle liquor which mainly contains Fe3+, Al3+ was generated, then calcium aluminate was used to adjust pH value and the basicity of the pickle liquor, the PAFC was subsequently prepared after the polymerization process. The optimal synthesizing parameters for the preparation of PAFC obtained were as follows: the concentration of hydrochloric acid of 24 wt%, ratio of hydrochloric acid to bauxite tailings of 6:1, temperature of 90ºC, leaching time of 2.5 hours, ration of pickle liquor to calcium aluminate of 12:1, polymerization temperature of 90ºC and polymerization time of about 3 hours. The basicity of PAFC was higher than 68%, the sum concentration of Al2O3 and Fe2O3 was beyond 12.5%. The results of flocculation tests indicate that the PAFC has a better performance of removing the turbidity of wastewater compared to PAC, and PAFC prepared by bauxite tailings is a kind of high quality flocculants.

  8. Probabilistic siting analysis of nuclear power plants emphasizing atmospheric dispersion of radioactive releases and radiation-induced health effects

    International Nuclear Information System (INIS)

    Savolainen, Ilkka

    1980-01-01

    A presentation is made of probabilistic evaluation schemes for nuclear power plant siting. Effects on health attributable to ionizing radiation are reviewed, for the purpose of assessment of the numbers of the most important health effect cases in light-water reactor accidents. The atmospheric dispersion of radioactive releases from nuclear power plants is discussed, and there is presented an environmental consequence assessment model in which the radioactive releases and atmospheric dispersion of the releases are treated by the application of probabilistic methods. In the model, the environmental effects arising from exposure to radiation are expressed as cumulative probability distributions and expectation values. The probabilistic environmental consequence assessment model has been applied to nuclear power plant site evaluation, including risk-benefit and cost-benefit analyses, and the comparison of various alternative sites. (author)

  9. Decision analysis for the siting of nuclear power plants: the relevance of multiattribute utility theory

    International Nuclear Information System (INIS)

    Keeney, R.L; Nair, K.

    1975-01-01

    The necessity for improved decision making concerning the siting and licensing of major power facilities has been accelerated in the past decade by the increased environmental consciousness of the public and by the energy crisis. These problems are exceedingly complex due to their multiple objective nature, the many interest groups, the long-range time horizons, and the inherent uncertainties of the potential impacts of any decision. Along with the relatively objective economic and engineering concerns, clearly the more subjective factors involving safety, environmental, and social issues are crucial to the problem. Hence, the professional judgments and knowledge of experts in these areas should be utilized in analyses of siting decisions. Likewise, the preferences of the general public, as consumers, the utility companies, as builders and operators of power plant facilities, and environmentalists and the government must be accounted for in analyzing power plant siting and licensing issues. We advocate an approach for formally articulating the experts' judgments and the decision makers' preferences, both of which are clearly subjective, and processing these along with the more objective considerations in a logical manner to acquire the implications for decision making. The appropriateness and application of decision analysis for power plant location decisions is discussed and illustrated. Emphasis is placed on the assessment of the decision maker's preferences and tradeoffs concerning multiple objectives. (U.S.)

  10. A study on the food consumption rates for off-site radiological dose assessment around Korean Nuclear Power Plants

    International Nuclear Information System (INIS)

    Lee, Gab Bock; Chung, Yang Geun

    2008-01-01

    The internal dose by food consumption mostly accounts for radiological dose of public around Nuclear Power Plants (NPPs). But, food consumption rates applied to off-site dose calculation in Korea which are the result of field investigation around Kori NPP by the KAERI (Korea Atomic Energy Research Institute) in 1988, are not able to reflect the latest dietary characteristics of Korean. The food consumption rates to be used for radiological dose assessment in Korea are based on the maximum individual of US NRC (Nuclear Regulatory Commission) Regulatory Guide 1.109. However, the representative individual of the critical group is considered in the recent ICRP (International Commission on Radiological Protection) recommendation and European nations' practice. Therefore, the study on the re-establishment of the food consumption rates for individual around nuclear power plant sites in Korea was carried out to reflect on the recent change of the Korean dietary characteristics and to apply the representative individual of critical group to domestic regulations. The ministry of Health and Welfare Affairs has investigated the food and nutrition of nations every 3 years based on the Law of National Health Improvement. The statistical data such as mean, standard deviation, various percentile values about food consumption rates to be used for the representative individual of the critical group were analyzed by using the raw data of the national food consumption survey in 2001∼2002. Also, the food consumption rates for maximum individual are re-estimated

  11. An updated assessment of the prospects for fuel cell-powered buses. An information paper

    Energy Technology Data Exchange (ETDEWEB)

    Sanderson, T.K. [Future Energy Solutions, Harwell (United Kingdom)

    2005-07-01

    This report presents updated conclusions of the Department of Trade and Industry's research and development programme to assess the commercial prospects for advanced fuel cells in buses. The programme has focussed on low temperature solid polymer fuel cells (SPFCs) for transport and combined heat and power (CHP)/distributed power and high temperature solid oxide fuel cells (SOFCs) for CHP/distributed power. As well as assessing the prospects for SPFCs in buses, the report examines those for alkaline fuel cells (AFCs) and phosphoric acid fuel cells (PAFCs) in buses. The report provides an assessment of the status of technology development for different types of fuel cells in terms of applications to buses and offers estimates of market potential. Some fuel-cell powered buses are now available for demonstration purposes but the report concludes that truly commercial sales are unlikely to start before 2010 and widespread deployment is expected to take a further ten years after that. Buses have now slipped behind cars in terms of worldwide deployment. The issue of fuel choice is considered largely resolved with most fleet vehicle/bus manufacturers currently focussing on hydrogen as a fuel. A discussion of the prospects and barriers for fuel cell buses concludes that cost reduction is now the major barrier to the successful commercialisation of fuel cells in buses. More demonstration prototypes and field trials are required to provide information on energy, environmental and economic performance of fuel cell buses. Field trials could also provide information to assist the development of refuelling systems, fuel storage systems, stacks and other system components and to gain experience of building integrated fuel cell systems.

  12. Controlled soil warming powered by alternative energy for remote field sites.

    Science.gov (United States)

    Johnstone, Jill F; Henkelman, Jonathan; Allen, Kirsten; Helgason, Warren; Bedard-Haughn, Angela

    2013-01-01

    Experiments using controlled manipulation of climate variables in the field are critical for developing and testing mechanistic models of ecosystem responses to climate change. Despite rapid changes in climate observed in many high latitude and high altitude environments, controlled manipulations in these remote regions have largely been limited to passive experimental methods with variable effects on environmental factors. In this study, we tested a method of controlled soil warming suitable for remote field locations that can be powered using alternative energy sources. The design was tested in high latitude, alpine tundra of southern Yukon Territory, Canada, in 2010 and 2011. Electrical warming probes were inserted vertically in the near-surface soil and powered with photovoltaics attached to a monitoring and control system. The warming manipulation achieved a stable target warming of 1.3 to 2 °C in 1 m(2) plots while minimizing disturbance to soil and vegetation. Active control of power output in the warming plots allowed the treatment to closely match spatial and temporal variations in soil temperature while optimizing system performance during periods of low power supply. Active soil heating with vertical electric probes powered by alternative energy is a viable option for remote sites and presents a low-disturbance option for soil warming experiments. This active heating design provides a valuable tool for examining the impacts of soil warming on ecosystem processes.

  13. Controlled soil warming powered by alternative energy for remote field sites.

    Directory of Open Access Journals (Sweden)

    Jill F Johnstone

    Full Text Available Experiments using controlled manipulation of climate variables in the field are critical for developing and testing mechanistic models of ecosystem responses to climate change. Despite rapid changes in climate observed in many high latitude and high altitude environments, controlled manipulations in these remote regions have largely been limited to passive experimental methods with variable effects on environmental factors. In this study, we tested a method of controlled soil warming suitable for remote field locations that can be powered using alternative energy sources. The design was tested in high latitude, alpine tundra of southern Yukon Territory, Canada, in 2010 and 2011. Electrical warming probes were inserted vertically in the near-surface soil and powered with photovoltaics attached to a monitoring and control system. The warming manipulation achieved a stable target warming of 1.3 to 2 °C in 1 m(2 plots while minimizing disturbance to soil and vegetation. Active control of power output in the warming plots allowed the treatment to closely match spatial and temporal variations in soil temperature while optimizing system performance during periods of low power supply. Active soil heating with vertical electric probes powered by alternative energy is a viable option for remote sites and presents a low-disturbance option for soil warming experiments. This active heating design provides a valuable tool for examining the impacts of soil warming on ecosystem processes.

  14. A new approach to the nuclear power plant site licensing

    Energy Technology Data Exchange (ETDEWEB)

    Kidron, A A [Israel Electric Corp. Ltd., Haifa (Israel)

    1996-12-01

    The Israel Electric Corporation Ltd.(IEC) conducted a survey to determine the geotechnical suitability of the Shivta Site for the purpose of erecting a Nuclear Power Station and presented the results in a Preliminary Safety Analysis Report (PSAR) to the Licensing Division of the Israel Atomic Energy Commission (LD). The studies for selecting a site in the NW Negev were conducted by multi-disciplinary teams of Israeli and US professionals, beginning in 1982, over a twelve-year period. The investigations involved comprehensive geological, geophysical, geotechnical, hydrological, as well as geomorphic and pedologic evaluations of the region and the then- proposed site locale. The prior studies were completed using highly advanced and modern tools and approaches and provided a significant amount of information related to the tectonic and seismic characteristics of the NW Negev region. (author).

  15. Power plant siting; an application of the nominal group process technique

    International Nuclear Information System (INIS)

    Voelker, A.H.

    1976-01-01

    The application of interactive group processes to the problem of facility siting is examined by this report. Much of the discussion is abstracted from experience gained in applying the Nominal Group Process Technique, an interactive group technique, to the identification and rating of factors important in siting nuclear power plants. Through this experience, interactive group process techniques are shown to facilitate the incorporation of the many diverse factors which play a role in siting. In direct contrast to mathematical optimization, commonly represented as the ultimate siting technique, the Nominal Group Process Technique described allows the incorporation of social, economic, and environmental factors and the quantification of the relative importance of these factors. The report concludes that the application of interactive group process techniques to planning and resource management will affect the consideration of social, economic, and environmental concerns and ultimately lead to more rational and credible siting decisions

  16. External main-induced events in relation to nuclear power plant siting

    International Nuclear Information System (INIS)

    1981-01-01

    This safety Guide recomments procedures and provides information for use in implementing that part of the code of safety in Nuclear Power Plant Siting (IAEA Safety Series No. 50-C-S) which concerns man-induced events external to the plant, up to the evaluation of corresponding design basis parameters. Like the code, the Guide forms part of the IAEA's programme, referred to as the NUSS programme, for establishing codes of practice and safety Guides relating to land-based stationary thermal neutron power plants

  17. Modelling a reliable wind/PV/storage power system for remote radio base station sites without utility power

    Energy Technology Data Exchange (ETDEWEB)

    Bitterlin, Ian F [Emerson Network Power Ltd., Globe Park, Marlow, SL7 1YG (United Kingdom)

    2006-11-22

    The development of photovoltaic (PV) cells has made steady progress from the early days, when only the USA space program could afford to deploy them, to now, seeing them applied to roadside applications even in our Northern European climes. The manufacturing cost per watt has fallen and the daylight-to-power conversion efficiency increased. At the same time, the perception that the sun has to be directly shining on it for a PV array to work has faded. On some of those roadside applications, particularly for remote emergency telephones or for temporary roadwork signage where a utility electrical power connection is not practical, the keen observer will spot, usually in addition to a PV array, a small wind-turbine and an electrical cabinet quite obviously (by virtue of its volume) containing a storage battery. In the UK, we have the lions share (>40%) of Europe's entire wind power resource although, despite press coverage of the 'anti-wind' lobby to the contrary, we have hardly started to harvest this clean and free energy source. Taking this (established and proven) roadside solution one step further, we will consider higher power applications. A cellular phone system is one where a multitude of remote radio base stations (RBS) are required to provide geographical coverage. With networks developing into the so called '3G' technologies the need for base stations has tripled, as each 3G cell covers only 1/3 the geographical area of its '2G' counterpart. To cover >90% of the UK's topology (>97% population coverage) with 3G cellular technology will requires in excess of 12,000 radio base stations per operator network. In 2001, there were around 25,000 established sites and, with an anticipated degree of collocation by necessity, that figure is forecast to rise to >47,000. Of course, the vast majority of these sites have a convenient grid connection. However, it is easy to see that the combination of wind and PV power generation and an energy storage system may be an

  18. Site selection and evaluation for nuclear power plants with respect to population distribution

    International Nuclear Information System (INIS)

    1980-01-01

    This safety guide, relating population distribution to site selection and evaluation, for nuclear power plants, forms part of the IAEA's programme, referred to as the NUSS programme (Nuclear Safety Standards). The guide presents population distribution data, requirements, examples of site screening methods, and an overview of radiological impact assessment with respect to population distribution

  19. Borehole geophysics in nuclear power plant siting

    International Nuclear Information System (INIS)

    Crosby, J.W.; Scott, J.D.

    1979-01-01

    Miniaturized borehole geophysical equipment designed for use in ground-water investigations can be adapted to investigations of nuclear power plant sites. This equipment has proved to be of value in preliminary and comprehensive studies of interior basins where thick sequences of Quaternary clastic sediment, occasionally with associated volcanic rocks, pose problems of stratigraphic correlation. The unconsolidated nature of the deposits generally requires that exploratory holes be cased, which ordinarily restricts the borehole geophysical studies to the radiation functions--natural gamma, gamma-gamma, neutron-gamma, and neutron-epithermal neutron logs. Although a single log response may be dominant in a given area, correlations derive from consideration of all log responses as a composite group. Because major correlations usually are based upon subtle differences in the physical properties of the penetrated sediment, high-resolution logging procedures are employed with some sacrifice of the quantitative perameters important to petroleum technology. All geophysical field data are recorded as hard copy and as digital information on punched paper tape

  20. Advanced breaking technology on the Mochovce nuclear power plant building site

    International Nuclear Information System (INIS)

    Mraz, M.; Podel, R.; Vojta, A.

    1982-01-01

    Observing the given deadlines of the construction of the Mochovce nuclear power plant and the required volumes of breaking to the total value of 6.2 million m 3 of rock, the required output was derived for the 7th five year plan to the value of 200,000 m 3 per month, i.e., 10,000 m 3 per day and 700 m 3 per hour. The basic task is to build a flat building site with an area of 2,300 by 700 m 2 which requires the removal of a masiff of rocks rising to a height of 37 m, and by compacting the mined rock to build heaps to a height of 20 m. The rocks were disintegrated by blasting. Surface blasting was used for mining faces and ribs. POLONIT 2 or PERMON DAP 1 were mainly used for blasting (ammonium nitrate explosives). The Danubit 1 detonator was used in holes flooded with water. For drilling a combination was used of drilling machines HBM 70 Hausherr with a drilling diameter of 130 to 155 mm and Ingersol Rand ECM 350 with a drilling diameter of 80 mm. The compressors used are Atlas Copco XRHS 350 Dd and PTS 900 Dd. As the optimal combination of machines for the removal of disengaged material for the daily output of 15,000 m 3 the combination was used of 6 excavators with a shovel volume of 2.5 m 3 ORENSTEIN-KOPPEL RH 25 with 12 Kockum 445 trucks and 18 ORENSTEIN-KOPPEL RH 40 excavators with a shovel volume of 4 m 3 and a total of 64 Caterpillar 769 C, Belaz 548 A, Tatra T 200 and T 138 S1 trucks. The planned targets are being fulfilled and the work performed up to now on the Mochovce site equals 2.5 million m 3 of excavated and removed rock. (B.S.)

  1. Advanced breaking technology on the Mochovce nuclear power plant building site

    Energy Technology Data Exchange (ETDEWEB)

    Mraz, M; Podel, R; Vojta, A [Vyskumny Ustav Inzinierskych Stavieb, Bratislava (Czechoslovakia)

    1982-10-01

    Observing the given deadlines of the construction of the Mochovce nuclear power plant and the required volumes of breaking to the total value of 6.2 million m/sup 3/ of rock, the required output was derived for the 7th five year plan to the value of 200,000 m/sup 3/ per month, i.e., 10,000 m/sup 3/ per day and 700 m/sup 3/ per hour. The basic task is to build a flat building site with an area of 2,300 by 700 m/sup 2/ which requires the removal of a masiff of rocks rising to a height of 37 m, and by compacting the mined rock to build heaps to a height of 20 m. The rocks were disintegrated by blasting. Surface blasting was used for mining faces and ribs. POLONIT 2 or PERMON DAP 1 were mainly used for blasting (ammonium nitrate explosives). The Danubit 1 detonator was used in holes flooded with water. For drilling a combination was used of drilling machines HBM 70 Hausherr with a drilling diameter of 130 to 155 mm and Ingersol Rand ECM 350 with a drilling diameter of 80 mm. The compressors used are Atlas Copco XRHS 350 Dd and PTS 900 Dd. As the optimal combination of machines for the removal of disengaged material for the daily output of 15,000 m/sup 3/ the combination was used of 6 excavators with a shovel volume of 2.5 m/sup 3/ ORENSTEIN-KOPPEL RH 25 with 12 Kockum 445 trucks and 18 ORENSTEIN-KOPPEL RH 40 excavators with a shovel volume of 4 m/sup 3/ and a total of 64 Caterpillar 769 C, Belaz 548 A, Tatra T 200 and T 138 S1 trucks. The planned targets are being fulfilled and the work performed up to now on the Mochovce site equals 2.5 million m/sup 3/ of excavated and removed rock.

  2. SITE-2, Power Plant Siting, Cost, Environment, Seismic and Meteorological Effects

    International Nuclear Information System (INIS)

    Frigerio, N.A.; Habegger, L.J.; King, R.F.; Hoover, L.J.; Clark, N.A.; Cobian, J.M.

    1977-01-01

    1 - Description of problem or function: SITE2 is designed to (1) screen candidate energy facility sites or areas within an electric utility region, based on the region's physical and socioeconomic attributes, the planned facility's characteristics, and impact assessments, and (2) evaluate the cumulative regional impacts associated with alternate energy supply options and inter-regional energy import/export practices, specifically, comparison of different energy technologies and their regional distribution in clustered or dispersed patterns. 2 - Method of solution: The SITE2 methodology is based on the quantification of three major site-related vectors. A cost vector is determined which identifies site-specific costs, such as transmission costs, cooling costs as related to water availability, and costs of specific controls needed to protect the surrounding environment. An impact vector is also computed for each potential site, using models of health and environmental impacts incurred in areas adjacent to the site. Finally, a site attribute vector is developed which reflects such characteristics as population, seismic conditions, meteorology, land use, and local ecological systems. This vector can be used to eliminate certain sites because of their inability to satisfy specific constraints. These three vectors can be displayed as density maps and combined in a simple overlay approach, similar to that developed by I. L. McHarg in reference 2, to identify candidate sites. Alternatively, the vector elements can be computationally combined into a weighted sum to obtain quantitative indicators of site suitability

  3. SITE-2, Power Plant Siting, Cost, Environment, Seismic and Meteorological Effects

    Energy Technology Data Exchange (ETDEWEB)

    Frigerio, N A [Environmental Impact Studies, Argonne National Laboratory 9700 South Cass Avenue, Argonne, Illinois 60439 (United States); Habegger, L J; King, R F; Hoover, L J [Energy and Environmental Systems Division, Argonne National Laboratory 9700 South Cass Avenue, Argonne, Illinois 60439 (United States); Clark, N A [Applied Mathematics Division, Argonne National Laboratory, 9700 South Cass Avenue, Argonne, Illinois 60439 (United States); Cobian, J M [Northwestern University, Evanston, Illinois 60201 (United States)

    1977-08-01

    1 - Description of problem or function: SITE2 is designed to (1) screen candidate energy facility sites or areas within an electric utility region, based on the region's physical and socioeconomic attributes, the planned facility's characteristics, and impact assessments, and (2) evaluate the cumulative regional impacts associated with alternate energy supply options and inter-regional energy import/export practices, specifically, comparison of different energy technologies and their regional distribution in clustered or dispersed patterns. 2 - Method of solution: The SITE2 methodology is based on the quantification of three major site-related vectors. A cost vector is determined which identifies site-specific costs, such as transmission costs, cooling costs as related to water availability, and costs of specific controls needed to protect the surrounding environment. An impact vector is also computed for each potential site, using models of health and environmental impacts incurred in areas adjacent to the site. Finally, a site attribute vector is developed which reflects such characteristics as population, seismic conditions, meteorology, land use, and local ecological systems. This vector can be used to eliminate certain sites because of their inability to satisfy specific constraints. These three vectors can be displayed as density maps and combined in a simple overlay approach, similar to that developed by I. L. McHarg in reference 2, to identify candidate sites. Alternatively, the vector elements can be computationally combined into a weighted sum to obtain quantitative indicators of site suitability.

  4. Post-TMI developments in U.S. nuclear power siting and licensing policies

    International Nuclear Information System (INIS)

    Rowden, M.A.

    1981-10-01

    The regulatory consequences of the Three Mile Island accident continue to exert a dominating influence on the American nuclear power programme, in particular on siting and licensing policies. The major regulatory and legislative measures are discussed and also listed in chronological order and summarized in the Appendices to the paper. These summaries illustrate the shift in focus of the regulatory measures from an initial emphasis on licensing constraints to a change so as to expedite the licensing procedure. (NEA) [fr

  5. Nuclear power plant attempts in Turkey and the first licensed site

    International Nuclear Information System (INIS)

    Bektur, Y.; Bezdegumeli, U.

    2004-01-01

    In this paper, detailed information regarding Turkey's past attempts for the construction of a nuclear power plant (NPP) and site survey studies conducted for this plant is given. Also, some important characteristics of the first licensed site, namely Akkuyu, are summarized. There were four attempts made for the construction of an NPP in the past. However, all of them failed due to technical, economical and/or some other reasons. Akkuyu site has been selected among around 25 candidate sites for the reasons that bulky materials can be transported there by sea; it is located near the major electricity demand centers; soil-structure interaction and slab stability are suitable for the construction of an NPP; its surrounding is one of the most sparsely populated areas of Turkey; and it is seismically the most stable region in earthquake-prone Turkey, e.g. Turkish Electricity Authority (TEK) was granted a site license for the Akkuyu in 1976. (author)

  6. The influence of home-site factors on residents' willingness to pay: An application for power generation from scrubland in Galicia, Spain

    International Nuclear Information System (INIS)

    Solino, Mario; Farizo, Begona A.; Campos, Pablo

    2009-01-01

    The main objective of this paper is to measure how much home-site factors can help to explain the individual WTP for an environmental improvement in power generation in Galicia, Spain. The results show that home-site variables such as a dispersed population, local community income, population growth and coastal/inland emplacements have significant effects on the residents' WTP. Individual and home-site models are compared using goodness-of-fit measures, and implications for forestry resources management and energy planning are discussed. The results favor to take into account the home-site variables into the WTP function. Moreover, a different structure of preferences for coastal and inland inhabitants is identified. A cross-validity analysis shows that some home-site coefficients are common to both sub-samples, but the scale parameters are not homogenous. This analysis could be useful to inform and support the public energy policy when designing incentives that promote the electric use of biomass.

  7. Hydrosphere monitoring at nuclear power plant sites

    International Nuclear Information System (INIS)

    Belousova, A.P.; Zakharova, T.V.; Shvets, V.M.

    1993-01-01

    The paper deals with problems related to protection of the environment in areas occupied by nuclear power plants (NPP). NPP construction and operation result in destruction of ecological, geochemical and geological equilibria in and around NPP sites. This process requires monitoring. Recommendations of the International Agency for Atomic Energy (IAAE) suggest monitoring to commence 2-3 years prior to the start of NPP construction. The paper describes the extent of hydrosphere monitoring and guidelines along which monitoring is to be organized. The authors recommend a certain approach toward the planning observation networks and provide description of forecasting subsystem that consist of a data bank, a continuously operating model (COM) and a forecast unit

  8. Application of microearthquake surveys in nuclear power plant siting

    International Nuclear Information System (INIS)

    1985-06-01

    Earthquakes of magnitude less than 3 are generally referred to as microearthquakes. After an overview of the use of microearthquake survey in decisions related to the siting of nuclear power plants, the main aspects of a microearthquake survey network are discussed. The use of microearthquake surveys in investigating problems related to near-field (floating) earthquakes is also discussed. The discussion is centered on the practical application of such a survey leading from objectives and limitations over to planning, instrumentation, operation, maintenance, processing of the data, and interpretation and reporting of the results. An appendix entitled Earthquake Magnitude gives useful background information for definitions of different types of magnitude and their calculation using the records from microearthquake surveys

  9. Electrokinetic remediation of plutonium-contaminated nuclear site wastes: Results from a pilot-scale on-site trial

    International Nuclear Information System (INIS)

    Agnew, Kieran; Cundy, Andrew B.; Hopkinson, Laurence; Croudace, Ian W.; Warwick, Phillip E.; Purdie, Philip

    2011-01-01

    This paper examines the field-scale application of a novel low-energy electrokinetic technique for the remediation of plutonium-contaminated nuclear site soils, using soil wastes from the Atomic Weapons Establishment (AWE) Aldermaston site, Berkshire, UK as a test medium. Soils and sediments with varying composition, contaminated with Pu through historical site operations, were electrokinetically treated at laboratory-scale with and without various soil pre-conditioning agents. Results from these bench-scale trials were used to inform a larger on-site remediation trial, using an adapted containment pack with battery power supply. 2.4 m 3 (ca. 4 tonnes) of Pu-contaminated soil was treated for 60 days at a power consumption of 33 kW h/m 3 , and then destructively sampled. Radiochemical data indicate mobilisation of Pu in the treated soil, and migration (probably as a negatively charged Pu-citrate complex) towards the anodic compartment of the treatment cell. Soil in the cathodic zone of the treatment unit was remediated to a level below free-release disposal thresholds (1.7 Bq/g, or <0.4 Bq/g above background activities). The data show the potential of this method as a low-cost, on-site tool for remediation of radioactively contaminated soils and wastes which can be operated remotely on working sites, with minimal disruption to site infrastructure or operations.

  10. Study for the selection of optimal site in northeastern, Mexico for wind power generation using genetic algorithms.

    Science.gov (United States)

    Gonzalez, T.; Ruvalcaba, A.; Oliver, L.

    2016-12-01

    The electricity generation from renewable resources has acquired a leading role. Mexico particularrly it has great interest in renewable natural resources for power generation, especially wind energy. Therefore, the country is rapidly entering in the development of wind power generators sites. The development of a wind places as an energy project, does not have a standardized methodology. Techniques vary according to the developer to select the best place to install a wind turbine system. Generally to install the system the developers consider three key factors: 1) the characteristics of the wind, 2) the potential distribution of electricity and 3) transport access to the site. This paper presents a study with a different methodology which is carried out in two stages: the first at regional scale uses "space" and "natural" criteria in order to select a region based on its cartographic features such as politics and physiographic division, location of conservation natural areas, water bodies, urban criteria; and natural criteria such as the amount and direction of the wind, the type and land use, vegetation, topography and biodiversity of the site. The result of the application of these criteria, gives a first optimal selection area. The second part of the methodology includes criteria and variables on detail scale. The analysis of all data information collected will provide new parameters (decision variables) for the site. The overall analysis of the information, based in these criteria, indicates that the best location that the best location of the field would be the southern Coahuila and the central part of Nuevo Leon. The wind power site will contribute to the economy grow of important cities including Monterrey. Finally, computational model of genetic algorithm will be used as a tool to determine the best site selection depending on the parameters considered.

  11. Nuclear power plant attempts in Turkey and the first licensed site

    International Nuclear Information System (INIS)

    Bektur, Y.; Bezdegumeli, U.

    2004-01-01

    Turkey is currently in a rapid industrialization process with a young population of 71 million. Electricity is an inevitable need for Turkey as a fast developing country. Turkey's average annual growth rates of electricity consumption have been 8% in the last two decades. The installed electricity generating capacity of Turkey reached 36 GW; the annual gross power generation was 140 TWh (23% lignite and coal, 44% natural gas, 25% hydro and 8% others); and the annual gross per capita consumption of electricity was around 2.000 kWh as of end-2003. According to forecasts prepared by the Ministry of Energy and Natural Resources (MENR), Turkey will need about 60 GW of capacity by 2010, and about 100 GW by 2020. This implies power demand growth rates of at least 8% per annum for the coming decade and at least 6% per annum for the following decade. This means that there is a need for rapid build-up of 3 GW new capacities per year for at least several years. Turkey's experience with nuclear power dates back to the 1960s - a research reactor has been operating in Istanbul since 1962 - and successive governments have had plans to introduce commercial nuclear power to the country for three decades or more. Since 1965, four attempts were made for the construction of an NPP in Turkey, but all failed. Turkish Electricity Authority (TEK, reorganized as Electricity Generation Corporation in 2002) was granted a site license for the Akkuyu site in 1976. According to the current long-term energy planning studies made by MENR, nuclear power is an important option to enhance the national energy security and reliability. In the light of this study, the Turkish Government has an intention for commencement of a nuclear power program that envisages the construction of 4500 M We nuclear power installed capacity in the next decade if the private energy sector do not make an attempt

  12. Early site reviews for nuclear power facilities: procedures and possible technical review options. Draft

    International Nuclear Information System (INIS)

    1978-02-01

    The document provides guidance for utility companies, State and other governmental agencies, and others who may request or may wish to participate in an early review of site suitability issues related to a site proposed for a nuclear power or test reactor. Although the emphasis of this document is on a nuclear electric generating station, the guidance provided can be used for a test reactor or other kinds of reactors. The procedures to be followed by applicants for construction permits and by others are described and the possible significant areas of technical review are delineated

  13. Satellite Power System (SPS) mapping of exclusion areas for rectenna sites

    Science.gov (United States)

    Blackburn, J. B., Jr.; Bavinger, B. A.

    1978-01-01

    The areas of the United States that were not available as potential sites for receiving antennas that are an integral part of the Satellite Power System concept are presented. Thirty-six variables with the potential to exclude the rectenna were mapped and coded in a computer. Some of these variables exclude a rectenna from locating within the area of its spatial influence, and other variables potentially exclude the rectenna. These maps of variables were assembled from existing data and were mapped on a grid system.

  14. Requirements and criteria for choosing sites suitable for the construction of nuclear installations and power stations

    International Nuclear Information System (INIS)

    1978-05-01

    The present document explains the selection criteria for areas in Italy suitable for the installation of nuclear power stations to be included in the 'National Site Map' provided for in Section 23 of Act No 393 of 2 August 1975. It represents the results of a thorough investigation into the various aspects of the problem of siting nuclear power stations, at the present stage of technology, taking into account the effect of the installations on the environment and the effect of the environment on the installations. The essential aim is to demonstrate that the requirements derived from these analyses, and on which there was full consultation with the other controlling bodies of European countries (in particular, France, Great Britain and West Germany) ensure the optimum choice of areas from the point of view of safety and public health. (author)

  15. Study of the legal problems raised by the siting of nuclear power stations in artificial islands

    International Nuclear Information System (INIS)

    Hebert, J.; Guieze, J.L.

    1975-01-01

    The creation and operation of a nuclear power station on an artificial island in French waters are governed by domestic law and are subject to two types of procedure: the first concerns erection of the artificial island and the second the control of the public authorities over creation and operation of the nuclear power station. At administrative level, the setting up of an artificial island requires that it be attached to a commune as well as permission for occupancy from the maritime authorities. Furthermore, setting up of a nuclear power station on an artificial island is subject to the licensing procedure for large nuclear installations and to delivery of the licenses required for release of gaseous and liquid radioactive effluents. Given the proximity of the high seas and eventually, the borders of other States, siting of a nuclear power station on an artificial island imposes obligations at international level. These requirements, which concern prevention of transfrontier pollution, stem from the London (1972) and Paris (1974) Conventions on marine pollution. The third party liability regime for a nuclear incident caused by an installation sited in territorial seas is that of the 1960 Paris Convention on third party liability in the nuclear field and the 1963 Brussels Supplementary Convention. Another problem likely to be raised is that of the right of innocent passage of ships near such installations [fr

  16. A study of feasibility, design and cost of excavations for underground siting of nuclear power plants

    International Nuclear Information System (INIS)

    1976-02-01

    A study conducted for the State Power Board on underground siting of nuclear power plants is presented. The report is divided into two chapters, both concerning the technical aspects of large underground openings. The first chapter gives a brief general survey of the problems involved, and the second outlines the technical aspects of a PWR project at a specific site. Details are given in 8 appendices and arrangement drawings. The project differs from conventional hydroelectric excavation schemes mainly in the fact that the spherical reactor containment requires a vault of 60m free span, and the turbine hall a cylindrical vault of 45m span, both of which exceed any span hitherto built for similar purposes. This requires a comparatively wide extrapolation of tested and available experience in underground excavations for permanent civil use. To what extent and under what circumstances such extrapolation is tenable must be tested in practice, preferably in a specially controlled prototype test. However the study indicates that conventional nuclear power plants can be sited underground when the topography and rock conditions are suitable. A 1000-2000 MW conventional plant adapted for underground siting will require large span caverns, tunnels and shafts, totalling about 1.0 mill. cubic metres of underground excavation. In addition access and cooling water tunnels, depending on the location, will require 0.2-0.5 mill. cubic metres of tunnel excavations. The excavations and support work can be completed within a construction time of about 2 1/2 years at an estimated total cost of 215 mill. Norwegian kroner (1975 value). (JIW)

  17. Geologic CO2 Sequestration Potential of 42 California Power Plant Sites: A Status Report to WESTCARB

    Energy Technology Data Exchange (ETDEWEB)

    Myers, Katherine B.L. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Wagoner, J. L. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2011-06-15

    Forty-two California natural gas combined-cycle (NGCC) power plant sites were evaluated for geologic carbon dioxide (CO2) sequestration potential. The following data were collected in order to gauge the sequestration potential of each power plant site: nearest potential CO2 sink, proximity to oil or gas fi elds, subsurface geology, surface expression of nearby faults, and subsurface water. The data for each site were compiled into a one-page, standalone profi le to serve as a quick reference for future decision-makers. A subset of these data was compiled into a summary table for easy comparison of all 42 sites. Decision-makers will consider the geologic CO2 sequestration potential of each power plant in concert with its CO2 capture potential and will select the most suitable sites for a future carbon capture and storage project. Once the most promising sites are selected, Lawrence Livermore National Laboratory (LLNL) will conduct additional geologic research in order to construct a detailed 3D geologic model for those sites.

  18. Main phases of siting for nuclear power plants with review of required investigations

    International Nuclear Information System (INIS)

    Malbasa, N.

    1984-01-01

    The purpose of the article is a short description of the main phases in the process of siting for nuclear power plants as interpreted and applied by the Institut za elektroprivredu, Zagreb in the screening, comparison and evaluation of the sites for NPPs in the SR of Croatia. The scope and purpose, as well as review of required data and investigations for each particular phase are given. Common used methods for the comparison of sites are described and example of rejection criteria applicable for early phases of the siting is proposed. It is given a list of the most important activities which detailed analysis id indispensable for ending of the evaluation and getting a site permit from the regulatory body. A legal and regulatory basis for carrying out the siting process is also described. (author)

  19. Site-Specific Atmospheric Dispersion Characteristics of Korean Nuclear Power Plant Sites

    International Nuclear Information System (INIS)

    Han, M. H.; Kim, E. H.; Suh, K. S.; Hwang, W. T.; Choi, Y. G.

    2001-01-01

    Site-specific atmospheric dispersion characteristics have been analyzed. The northwest and the southwest wind prevail on nuclear sites of Korea. The annual isobaric surface averaged for twenty years around Korean peninsula shows that west wind prevails. The prevailing west wind is profitable in the viewpoint of radiation protection because three of four nuclear sites are located in the east side. Large scale field tracer experiments over nuclear sites have been conducted for the purpose of analyzing the atmospheric dispersion characteristics and validating a real-time atmospheric dispersion and dose assessment system FADAS. To analyze the site-specific atmospheric dispersion characteristics is essential for making effective countermeasures against a nuclear emergency

  20. New appraisement of siting for a NPP on Mures river

    International Nuclear Information System (INIS)

    Traian Mauna

    2010-01-01

    The studies for a second NPP siting on inner Romanian rivers began in a careful manner since 1982 as a first part of the Nuclear Power Plant Romanian Program adopted by political and governmental authorities at the time. The experience gained from Cernavoda NPP siting, the first mission of new multi-branch of specialists team was to choose new NPP sites adapting the CANDU type NPP Cernavoda project to the new parameters of close water cooling circuit and of hard less or no rock foundation strata. The new sites conditions mean a lot of changes of CANDU license and a decrease the output power supplied to the national electric grid. The studies on the Mures river as alternative site of Olt river in Transylvania region began in 1986 and were stopped after 1990. This paper tries to reconsider shortly the old analysis focused on geological and geotechnical aspects and other local sites characteristics according to the last IAEA Safety Standards taking into account also the last types of NPP generations and the number of units. (author)

  1. Geotechnical aspects of site evaluation and foundations for nuclear power plants. Safety guide

    International Nuclear Information System (INIS)

    2003-01-01

    This publication is a revision of the former safety standards of IAEA Safety Series No. 50-SG-S8. The scope has been extended to cover not only foundations but also design questions related to geotechnical science and engineering, such as the bearing capacity of foundations, design of earth structures and design of buried structures. Seismic aspects also play an important role in this field, and consequently the Safety Guide on Evaluation of Seismic Hazards for Nuclear Power Plants, Safety Standards Series No. NS-G-3.3, which discusses the determination of seismic input motion, is referenced on several occasions. The present Safety Guide provides an interpretation of the Safety Requirements on Site Evaluation for Nuclear Installations and guidance on how to implement them. It is intended for the use of safety assessors or regulators involved in the licensing process as well as the designers of nuclear power plants, and it provides them with guidance on the methods and procedures for analyses to support the assessment of the geotechnical aspects of the safety of nuclear power plants

  2. Geotechnical aspects of site evaluation and foundations for nuclear power plants. Safety guide

    International Nuclear Information System (INIS)

    2006-01-01

    This publication is a revision of the former safety standards of IAEA Safety Series No. 50-SG-S8. The scope has been extended to cover not only foundations but also design questions related to geotechnical science and engineering, such as the bearing capacity of foundations, design of earth structures and design of buried structures Seismic aspects also play an important role in this field, and consequently the Safety Guide on Evaluation of Seismic Hazards for Nuclear Power Plants, Safety Standards Series No. NS-G-3.3, which discusses the determination of seismic input motion, is referenced on several occasions. The present Safety Guide provides an interpretation of the Safety Requirements on Site Evaluation for Nuclear Installations and guidance on how to implement them. It is intended for the use of safety assessors or regulators involved in the licensing process as well as the designers of nuclear power plants, and it provides them with guidance on the methods and procedures for analyses to support the assessment of the geotechnical aspects of the safety of nuclear power plants

  3. Solar radiation - to - power generation models for one-axis tracking PV system with on-site measurements from Eskisehir, Turkey

    Science.gov (United States)

    Filik, Tansu; Başaran Filik, Ümmühan; Nezih Gerek, Ömer

    2017-11-01

    In this study, new analytic models are proposed for mapping on-site global solar radiation values to electrical power output values in solar photovoltaic (PV) panels. The model extraction is achieved by simultaneously recording solar radiation and generated power from fixed and tracking panels, each with capacity of 3 kW, in Eskisehir (Turkey) region. It is shown that the relation between the solar radiation and the corresponding electric power is not only nonlinear, but it also exhibits an interesting time-varying characteristic in the form of a hysteresis function. This observed radiation-to-power relation is, then, analytically modelled with three piece-wise function parts (corresponding to morning, noon and evening times), which is another novel contribution of this work. The model is determined for both fixed panels and panels with a tracking system. Especially the panel system with a dynamic tracker produces a harmonically richer (with higher values in general) characteristic, so higher order polynomial models are necessary for the construction of analytical solar radiation models. The presented models, characteristics of the hysteresis functions, and differences in the fixed versus solar-tracking panels are expected to provide valuable insight for further model based researches.

  4. Model calculating annual mean atmospheric dispersion factor for coastal site of nuclear power plant

    Institute of Scientific and Technical Information of China (English)

    2001-01-01

    This paper describes an atmospheric dispersion field experiment performed on the coastal site of nuclear power plant in the east part of China during 1995 to 1996. The three-dimension joint frequency are obtained by hourly observation of wind and temperature on a 100m high tower; the frequency of the “event day of land and sea breezes” are given by observation of surface wind and land and sea breezes; the diffusion parameters are got from measurements of turbulent and wind tunnel simulation test.A new model calculating the annual mean atmospheric dispersion factor for coastal site of nuclear power plant is developed and established.This model considers not only the effect from mixing release and mixed layer but also the effect from the internal boundary layer and variation of diffusion parameters due to the distance from coast.The comparison between results obtained by the new model and current model shows that the ratio of annual mean atmospheric dispersion factor gained by the new model and the current one is about 2.0.

  5. The importante of physical and mathematical models for nuclear power plants site selection

    International Nuclear Information System (INIS)

    Rios, J.L.P.

    1989-01-01

    The importance of the release of effluents from nuclear installations for the site selection of nuclear power plants is discussed. The main available analysis methods, physical and mathematical, is presented [pt

  6. Supplementary Report on the Regulation of Site Selection and Preparation

    International Nuclear Information System (INIS)

    Webster, Philip

    2014-01-01

    The Committee on Nuclear Regulatory Activities (CNRA), based on the regulatory actions underway or being considered in different members countries concerning the design and construction of advanced nuclear power plants, established a working group responsible of the regulatory issues of siting, licensing and regulatory oversight of generation III+ and generation IV nuclear reactors. The Working Group on the Regulation of New Reactors (WGRNR) main purposes are to improve regulatory reviews by comparing practices in member countries; improve the licensing process of new reactors by learning from best practices in member countries; ensure that construction inspection issues and construction experience is shared; promote cooperation among member countries to improve safety; and enhance the effectiveness and efficiency of the regulatory process. The WGRNR has established a programme of work which includes: the collection of construction experience and the assessing of the information collected in order to share lessons learned and good practices; the review of regulatory practices concerning the regulation of nuclear sites selection and preparation; and the review of recent regulatory experience concerning the licensing structure of regulatory staff and regulatory licensing process. The WGRNR began in May 2008 a task of examining and documenting the various practices used by regulatory authorities in the regulation of nuclear power plant siting. The purpose of the task was to provide the member countries with practical information that would be helpful in assessing and potentially improving their regulatory practices and requirements on the regulation of sites. The task considered also regulatory practices on sites where a mixture of activities are taking place (e.g. operating units, new construction, and decommissioning, etc.). This work led to the publication in 2010 of the Report on the Survey on Regulation of Site Selection and Preparation NEA/CNRA/R(2010)3. This

  7. Location sites for nuclear power plants and the public drinking water supplies

    International Nuclear Information System (INIS)

    1987-05-01

    This report presents the results of a study by the Dutch RIWA- Working Group Nuclear Power Plants, of the possible effects of a nuclear-reactor melt-down accident upon the drinking-water supply in the Netherlands which is dependent on surface waters. The aim of this report is to contribute to the 're-consideration with regard to siting of nuclear power plants' of the Dutch government. In the case of a nuclear-reactor melt-down accident in the Netherlands or directly adjacent countries, surface waters destined for drinking-water production may be contaminated severely. The amount of contamination depends, among other things, upon the distance, wind direction, dry as well as wet deposition and the features of the place yielding drinking water. From calculations of contamination of surface waters in the case of open- supply build up it appears that the derived norm of the radionuclide cocktail may be exceeded for a period of weeks up to several months or even years. There are reasons to draw the same conclusion for supply build up in the dunes by means of surface infiltration in the dunes. A melt-down accident can cause very severe contamination. Also here it can be stated that, in the case of a calamity in the Netherlands or directly adjacent countries, a norm transgression may occur for weeks up to years. In view of the risks which nuclear power plants can hold for the drinking-water supply which depends upon surface-waters as basis element. Severe objections should be made with respect to the siting of nuclear power plants in the Netherlands unless the occurrence of melt-down accidents could be excluded. 11 refs.; 4 figs.; 7 tabs

  8. Public attitudes to nuclear and coal power in site selection for a future energy centre

    International Nuclear Information System (INIS)

    Baril, R.G.; Dobson, J.K.

    This paper discusses the results of a 1977 public attitude survey carried out as part of an Ontario Hydro generating site selection program along the North Channel of Lake Huron. The results of the survey are compared with those of two similar surveys conducted in 1974 and 1975. The main topics discussed include local citizen attitudes to a generating site in the area, nuclear power, attitude changes over three years, differences in attitudes to nuclear and to coal fired generation and the underlying reasons given for favouring or opposing nuclear power. The results of other surveys which have been conducted recently in Canada and internationally are discussed and compared with this survey. Most longitudinal studies point to a trend of declining public acceptance regarding nuclear power. If this trend continues, there are important implications for the nuclear power industry: they are discussed from a sociological and political perspective. (author)

  9. Pre-Feasibility Analysis of Pellet Manufacturing on the Former Loring Air Force Base Site. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    Energy Technology Data Exchange (ETDEWEB)

    Hunsberger, R.; Mosey, G.

    2014-04-01

    The U.S. Environmental Protection Agency (EPA) Office of Solid Waste and Emergency Response, in accordance with the RE-Powering America's Lands initiative, engaged the U.S. Department of Energy's (DOE) National Renewable Energy Laboratory (NREL) to conduct feasibility studies to assess the viability of developing renewable energy generating facilities on contaminated sites. This site, in Limestone, Maine -- formerly the location of the Loring Air Force Base but now owned by the Aroostook Band of Micmac -- was selected for the potential to produce heating pellets from woody feedstock. Biomass was chosen as the renewable energy resource to evaluate based on abundant woody-biomass resources available in the area. NREL also evaluates potential savings from converting existing Micmac property from oil-fired heating to pellet heating.

  10. Dose commitments due to radioactive releases from nuclear power plant sites in 1992. Volume 14

    International Nuclear Information System (INIS)

    Aaberg, R.L.; Baker, D.A.

    1996-03-01

    Population and individual radiation dose commitments have been estimated from reported radionuclide releases from commercial power reactors operating during 1992. Fifty-year dose commitments for a 1-year exposure from both liquid and atmospheric releases were calculated for four population groups (infant, child, teenager, and adult) residing between 2 and 80 km from each of 72 reactor sites. This report tabulates the results of these calculations, showing the dose commitments for both water and airborne pathways for each age group and organ. Also included for each of the sites is an estimate of individual doses, which are compared with 10 CFR Part 50, Appendix I, design objectives. The total collective dose commitments (from both liquid and airborne pathways) for each site ranged from a high of 3.7 person-rem to a low of 0.0015 person-rem for the sites with plants in operation and producing power during the year. The arithmetic mean was 0.66 person-rem. The total population dose for all sites was estimated at 47 person-rem for the 130-million people considered at risk. The individual dose commitments estimated for all sites were below the 10 CFR 50, Appendix I, design objectives

  11. Dose commitments due to radioactive releases from nuclear power plant sites in 1991. Volume 13

    Energy Technology Data Exchange (ETDEWEB)

    Baker, D.A. [Pacific Northwest Lab., Richland, WA (United States)

    1995-04-01

    Population and individual radiation dose commitments have been estimated from reported radionuclide releases from commercial power reactors operating during 1991. Fifty-year dose commitments for a one-year exposure from both liquid and atmospheric releases were calculated for four population groups (infant, child, teenager and adult) residing between 2 and 80 km from each of 72 reactor sites. This report tabulates the results of these calculations, showing the dose commitments for both water and airborne pathways for each age group and organ. Also included for each of the sites is an estimate of individual doses which are compared with 10 CFR Part 50, Appendix 1 design objectives. The total collective dose commitments (from both liquid and airborne pathways) for each site ranged from a high of 22 person-rem to a low of 0.002 person-rem for the sites with plants in operation and producing power during the year. The arithmetic mean was 1.2 person-rem. The total population dose for all sites was estimated at 88 person-rem for the 130 million people considered at risk. The individual dose commitments estimated for all sites were below the Appendix 1 design objectives.

  12. Dose commitments due to radioactive releases from nuclear power plant sites in 1992. Volume 14

    Energy Technology Data Exchange (ETDEWEB)

    Aaberg, R.L.; Baker, D.A.

    1996-03-01

    Population and individual radiation dose commitments have been estimated from reported radionuclide releases from commercial power reactors operating during 1992. Fifty-year dose commitments for a 1-year exposure from both liquid and atmospheric releases were calculated for four population groups (infant, child, teenager, and adult) residing between 2 and 80 km from each of 72 reactor sites. This report tabulates the results of these calculations, showing the dose commitments for both water and airborne pathways for each age group and organ. Also included for each of the sites is an estimate of individual doses, which are compared with 10 CFR Part 50, Appendix I, design objectives. The total collective dose commitments (from both liquid and airborne pathways) for each site ranged from a high of 3.7 person-rem to a low of 0.0015 person-rem for the sites with plants in operation and producing power during the year. The arithmetic mean was 0.66 person-rem. The total population dose for all sites was estimated at 47 person-rem for the 130-million people considered at risk. The individual dose commitments estimated for all sites were below the 10 CFR 50, Appendix I, design objectives.

  13. Dose commitments due to radioactive releases from nuclear power plant sites in 1991. Volume 13

    International Nuclear Information System (INIS)

    Baker, D.A.

    1995-04-01

    Population and individual radiation dose commitments have been estimated from reported radionuclide releases from commercial power reactors operating during 1991. Fifty-year dose commitments for a one-year exposure from both liquid and atmospheric releases were calculated for four population groups (infant, child, teenager and adult) residing between 2 and 80 km from each of 72 reactor sites. This report tabulates the results of these calculations, showing the dose commitments for both water and airborne pathways for each age group and organ. Also included for each of the sites is an estimate of individual doses which are compared with 10 CFR Part 50, Appendix 1 design objectives. The total collective dose commitments (from both liquid and airborne pathways) for each site ranged from a high of 22 person-rem to a low of 0.002 person-rem for the sites with plants in operation and producing power during the year. The arithmetic mean was 1.2 person-rem. The total population dose for all sites was estimated at 88 person-rem for the 130 million people considered at risk. The individual dose commitments estimated for all sites were below the Appendix 1 design objectives

  14. Dose commitments due to radioactive releases from nuclear power plant sites in 1990: Volume 12

    International Nuclear Information System (INIS)

    Baker, D.A.

    1994-11-01

    Population and individual radiation dose commitments have been estimated from reported radionuclide releases from commercial power reactors operating during 1990. Fifty-year dose commitments for a one-year exposure from both liquid and atmospheric releases were calculated for four population groups (infant, child, teen-ager and adult) residing between 2 and 80 km from each of 72 reactor sites. This report tabulates the results of these calculations, showing the dose commitments for both water and airborne pathways for each age group and organ. Also included for each of the sites is an estimate of individual doses which are compared with 10 CFR Part 50, Appendix 1 design objectives. The total collective dose commitments (from both liquid and airborne pathways) for each site ranged from a high of 15 person-rem to a low of 0.002 person-rem for the sites with plants in operation and producing power during the year. The arithmetic mean was 1.1 person-rem. The total population dose for all sites was estimated at 78 person-rem for the 130 million people considered at risk. The individual dose commitments estimated for all sites were below the Appendix 1 design objectives

  15. Decommissioning strategy and schedule for a multiple reactor nuclear power plant site

    Energy Technology Data Exchange (ETDEWEB)

    Monteiro, Deiglys Borges; Moreira, Joao M.L.; Maiorino, Jose Rubens, E-mail: deiglys.monteiro@ufabc.edu.br, E-mail: joao.moreira@ufabc.edu.br, E-mail: joserubens.maiorino@ufabc.edu.br [Universidade Federal do ABC (CECS/UFABC), Santo Andre, SP (Brazil). Centro de Engenharia, Modelagem e Ciencias Aplicadas

    2015-07-01

    The decommissioning is an important part of every Nuclear Power Plant life cycle gaining importance when there are more than one plant at the same site due to interactions that can arise from the operational ones and a decommissioning plant. In order to prevent undesirable problems, a suitable strategy and a very rigorous schedule should implemented and carried. In this way, decommissioning tasks such as fully decontamination and dismantling of activated and contaminated systems, rooms and structures could be delayed, posing as an interesting option to multiple reactor sites. The present work aims to purpose a strategy and a schedule for the decommissioning of a multiple reactor site highlighting the benefits of delay operational tasks and constructs some auxiliary services in the site during the stand by period of the shutdown plants. As a case study, will be presented a three-reactor site which the decommissioning process actually is in planning stage and that should start in the next decade. (author)

  16. Decommissioning strategy and schedule for a multiple reactor nuclear power plant site

    International Nuclear Information System (INIS)

    Monteiro, Deiglys Borges; Moreira, Joao M.L.; Maiorino, Jose Rubens

    2015-01-01

    The decommissioning is an important part of every Nuclear Power Plant life cycle gaining importance when there are more than one plant at the same site due to interactions that can arise from the operational ones and a decommissioning plant. In order to prevent undesirable problems, a suitable strategy and a very rigorous schedule should implemented and carried. In this way, decommissioning tasks such as fully decontamination and dismantling of activated and contaminated systems, rooms and structures could be delayed, posing as an interesting option to multiple reactor sites. The present work aims to purpose a strategy and a schedule for the decommissioning of a multiple reactor site highlighting the benefits of delay operational tasks and constructs some auxiliary services in the site during the stand by period of the shutdown plants. As a case study, will be presented a three-reactor site which the decommissioning process actually is in planning stage and that should start in the next decade. (author)

  17. Large-Scale Power Production Potential on U.S. Department of Energy Lands

    Energy Technology Data Exchange (ETDEWEB)

    Kandt, Alicen J. [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Elgqvist, Emma M. [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Gagne, Douglas A. [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Hillesheim, Michael B. [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Walker, H. A. [National Renewable Energy Laboratory (NREL), Golden, CO (United States); King, Jeff [Colorado School of Mines, Golden, CO (United States); Boak, Jeremy [Colorado School of Mines, Golden, CO (United States); Washington, Jeremy [Colorado School of Mines, Golden, CO (United States); Sharp, Cory [Colorado School of Mines, Golden, CO (United States)

    2017-11-03

    This report summarizes the potential for independent power producers to generate large-scale power on U.S. Department of Energy (DOE) lands and export that power into a larger power market, rather than serving on-site DOE loads. The report focuses primarily on the analysis of renewable energy (RE) technologies that are commercially viable at utility scale, including photovoltaics (PV), concentrating solar power (CSP), wind, biomass, landfill gas (LFG), waste to energy (WTE), and geothermal technologies. The report also summarizes the availability of fossil fuel, uranium, or thorium resources at 55 DOE sites.

  18. How prepared were the Puerto Rico Seismic Network sites for the arrival of Hurricane Maria? Lessons learned on communications, power and infrastructure.

    Science.gov (United States)

    Vanacore, E. A.; Lopez, A. M.; Huerfano, V.; Lugo, J.; Baez-Sanchez, G.

    2017-12-01

    For exactly 85 years the island of Puerto Rico in the northeastern Caribbean was spared from catastrophic category 4 hurricane winds. Then Hurricane Maria arrived on September 20, 2017 with maximum sustained winds of up to 155 mph. The eye of the hurricane crossed the island from southeast to northwest in eight hours leaving almost a meter of rainfall on its path. Sustained winds, gusts and precipitation were most certainly going to affect the seismic and geodetic equipment the Puerto Rico Seismic Network (PRSN) use for locating earthquakes in the region. PRSN relies on 35 seismic stations (velocity and strong-motion) to characterize the seismic behavior of the island and 15 geodetic (GNSS) stations to determine crustal deformation of the Puerto Rico - Virgin Islands microplate. PRSN stations have been designed to withstand earthquakes. However, the equipment suffered considerable damage due to the strong winds especially station communication towers. This coupled with catastrophic damage to the telecommunication and power grids of the island had severe effects on the network. Additionally, the level of devastation was such that it hampered the ability of PRSN staff to visit the sites for assessment and repair. Here we present the effects of category 4 hurricane had on our seismic and geodetic sites, examine the susceptibility of the PRSN stations' power and communications, and discuss future plans to recuperate and improve station resiliency for future catastrophic events. These lessons learned hopefully will help harden sites of networks, agencies and/or institutions that rely on similar infrastructure.

  19. Emergency power systems at nuclear power plants

    International Nuclear Information System (INIS)

    1982-01-01

    This Guide applies to nuclear power plants for which the total power supply comprises normal power supply (which is electric) and emergency power supply (which may be electric or a combination of electric and non-electric). In its present form the Guide provides general guidance for all types of emergency power systems (EPS) - electric and non-electric, and specific guidance (see Appendix A) on the design principles and the features of the emergency electric power system (EEPS). Future editions will include a second appendix giving specific guidance on non-electric power systems. Section 3 of this Safety Guide covers information on considerations that should be taken into account relative to the electric grid, the transmission lines, the on-site electrical supply system, and other alternative power sources, in order to provide high overall reliability of the power supply to the EPS. Since the nuclear power plant operator does not usually control off-site facilities, the discussion of methods of improving off-site reliability does not include requirements for facilities not under the operator's control. Sections 4 to 11 of this Guide provide information, recommendations and requirements that would apply to any emergency power system, be it electric or non-electric

  20. Algological studies on the site of the Fessenheim nuclear power station

    International Nuclear Information System (INIS)

    Pierre, J.F.

    1980-01-01

    Systematic study of the algal flora at five stations situated on both sides of the nuclear power station at Fessenheim (department of Haut-Rhin, France). The analysis of the diatomaceae populations in 1977 and 1978, i.e. before and after the start of the reactors, does not indicate, in the composition and abundance of algae, any modifications susceptible to be directly connected to the implantation of the nuclear power station [fr

  1. Nuclear Siting and Licensing Act of 1978. Hearings before the Subcommittee on Energy and Power, Committee on Interstate and Foreign Commerce, House of Representatives, Ninety-Fifth Congress

    International Nuclear Information System (INIS)

    Anon.

    1979-01-01

    The Subcommittee on Energy and Power conducted hearings on the administration proposal to revise the process by which nuclear power plants are licensed. The purpose of this proposal is to substantially reduce the amount of time needed to license and construct nuclear powerplants. The bill attempts to encourage the early selection of possible sites by separating the process by which such sites are approved fom the process by which plants are licensed. The bill would dispense with the existing requirement that all hearings be adjudicatory, and instead authorize informal hearings on certain issues, principally those which would be conducted pursuant to the National Environmental Policy Act of 1969. The bill would authorize a State which has established a program, consistent with the criteria contained in the act and regulations promulgated by the Nuclear Regulatory Commission, to determine the environmental acceptability of, and/or the need for, a proposed nuclear plant which would be located within its boundaries. Finally, the bill seeks to encourage the use of standardized design and authorizes the NRC to provide funds to intervenors under certain specified conditions

  2. Avian radioecology on a nuclear power station site. Technical progress report, 1 July 1974--30 June 1975

    International Nuclear Information System (INIS)

    Levy, C.K.

    1975-01-01

    The continuation of a program demonstrating that free-ranging wild birds can be used to assess environmental radionuclide levels is described. Wild passerine birds are trapped at a nuclear power station site and at two control sites, uniquely marked, non-destructively counted for levels of gamma-emitting radionuclides, and released. Subsequent recapture rates are as high as 80 percent for certain species. Nuclides detected included 40 K, 95 Zr- 95 Nb, 137 Cs, and apparent 131 I, the latter at levels just above detection limits (0.07 pCi/g). Significant variations in mean 137 Cs body burdens in Blue Jays and Bobwhite have been observed between sites less than 6 km apart. A significant temporal decrease in 137 Cs body burdens has been observed in various species of birds only at the reactor site. Vegetation and meteorological studies have been initiated to help explain these body-burden differences. The effective half-life of 137 Cs in the Blue Jay is 6.7 +- 1.5 days. The highest observed level of 95 Zr- 95 Nb (1.08 +- 0.07 pCi/g) was in a Grey Catbird. The effective half-life of the 95 Zr- 95 Nb was 69.9 +- 15 days, corresponding to the physical half-life of this isotope pair (65.5d), and the activity abruptly disappeared after the twelfth day of captivity suggesting that it was present in particulate form either on the feathers or skin, or in the bird's pulmonary system. Inter-laboratory comparisons of radionuclide measurements are reported. The number of birds banded during the current reporting period is 2720, while 2047 specimens were radioassayed, an increase of 9 percent and 313 percent, respectively. An exercise to test the practicality of obtaining avian samples from remote sites (i.e., > 50 miles away) for radionuclide measurement was performed satisfactorily. (U.S.)

  3. On-site electric power source facility for Japanese nuclear power plant

    International Nuclear Information System (INIS)

    Oohara, T.

    1986-01-01

    Trends of construction of nuclear power plants in Japan, occurrence rate of incidents/failures of electric facilities, major example of incidents/failures, their countermeasure to prevent recurrence are introduced. Furthermore, safety administration system of the Government, electric utilities and manufacturers, and various countermeasures to prevent incident/ failure of electrical facilities from the hardware and software sides are discussed. (author)

  4. On-site electric power source facility for Japanese nuclear power plant

    Energy Technology Data Exchange (ETDEWEB)

    Oohara, T. [Incident/Failure Analysis and Evaluation Office, Nuclear Power Safety Information Research Centre, Nuclear Power Engineering Test Centre, 2nd Floor, Shuwa-Kamiyacho Bldg., 3-13, 4-Chome, Toranomon Minato-ku, Tokyo 105 (Japan)

    1986-02-15

    Trends of construction of nuclear power plants in Japan, occurrence rate of incidents/failures of electric facilities, major example of incidents/failures, their countermeasure to prevent recurrence are introduced. Furthermore, safety administration system of the Government, electric utilities and manufacturers, and various countermeasures to prevent incident/ failure of electrical facilities from the hardware and software sides are discussed. (author)

  5. Nuclear power plant site evaluation using site population-meterology factor

    International Nuclear Information System (INIS)

    Rho, B.H.; Kang, C.H.

    1982-01-01

    In this paper, as a site evaluation technique, SPNF(Site Population Neteorology Factor) which is modified from SPF(Site Population Factor) of the USNRC model, is defined from site population and meteorology data in order to consider the radiological impacts to the population at large from the atmospheric dispersion of the radioactive effluents released during routine plant operation as well as accidental conditions. The SPMF model proved its propriety from the comparison of SPMF and SPF for Kori site. The relative suitability of Korean sites to the U.S. sites have been also examined using SPF. (Author)

  6. A framework for siting and dispatch of emerging energy resources to realize environmental and health benefits: Case study on peaker power plant displacement

    International Nuclear Information System (INIS)

    Krieger, Elena M.; Casey, Joan A.; Shonkoff, Seth B.C.

    2016-01-01

    Emerging grid resources such as energy storage and demand response have the potential to provide numerous environmental and societal benefits, but are primarily sited and operated to provide grid-specific services without optimizing these co-benefits. We present a four-metric framework to identify priority regions to deploy and dispatch these technologies to displace marginal grid air emissions with high environmental and health impacts. To the standard metrics of total mass and rate of air pollutant emissions we add location and time, to prioritize emission displacement near densely populated areas with poor air quality, especially at times when air pollutant concentrations exceed regulatory standards. We illustrate our framework with a case study using storage, demand response, and other technologies to displace peaker power plants, the highest-rate marginal emitters on the California grid. We combine spatial-temporal data on plant electricity generation, air quality standard exceedance days, and population characteristics available from environmental justice screening tool CalEnviroScreen 2.0 to determine where emissions reductions may have the greatest marginal benefit. This screening approach can inform grid siting decisions, such as storage in lieu of peaker plants in high impact regions, or dispatch protocol, such as triggering demand response instead of peaker plants on poor air quality days. - Highlights: •We develop a health and environmental framework for siting clean energy resources. •Metrics include total mass, time, rate and location of displaced marginal emissions. •Emission displacement is prioritized near dense populations on poor air quality days. •We apply our framework to the displacement of peaker power plant generation in CA. •We identify optimal places and times to site and dispatch storage and demand response.

  7. Distributional effects of the fiscal impact of power plant siting

    International Nuclear Information System (INIS)

    Vogt, D.P.; Bjornstad, D.J.

    1976-01-01

    Classical economic base analysis is grounded in the concept that export activity drives the local economy and that economic impacts due to development can be traced to changes in the export base. Local government activities are frequently treated as a consequence of economic change, but no significant economic impact has been associated with imported tax dollars. In this paper the siting of a power reactor is examined, and it is concluded that the major economic impact related to the siting may result from increases in the tax base, which permit either increased public expenditure or increased disposable income through tax rate decreases. It is argued that as the fraction of the tax base that is owned nonlocally increases, the community perceives a price change, since smaller amounts of local income must be foregone to purchase a constant level of public services. This relationship is estimated using a sample of rural counties drawn from the State of Tennessee. The empirical results generally support the importance of the price variable in determining discretionary expenditures out of local disposable incomes. This finding conforms to other results obtained through an examination of actual reactor sitings, and points to the importance of understanding community responses to increased tax base for understanding local economic impacts from reactor siting

  8. A pragmatic pairwise group-decision method for selection of sites for nuclear power plants

    International Nuclear Information System (INIS)

    Kutbi, I.I.

    1987-01-01

    A pragmatic pairwise group-decision approach is applied to compare two regions in order to select the more suitable one for construction of nulcear power plants in the Kingdom of Saudi Arabia. The selection methodology is based on pairwise comparison by forced choice. The method facilitates rating of the regions or sites using simple calculations. Two regions, one close to Dhahran on the Arabian Gulf and another close to Jeddah on the Red Sea, are evaluated. No specific site in either region is considered at this stage. The comparison is based on a set of selection criteria which include (i) topography, (ii) geology, (iii) seismology, (iv) meteorology, (v) oceanography, (vi) hydrology and (vii) proximetry to oil and gas fields. The comparison shows that the Jeddah region is more suitable than the Dhahran region. (orig.)

  9. Assesment of Carbon Credits for Power Generation Systems at GSM Base Station Site

    OpenAIRE

    Ani, Vincent Anayochukwu; Ani, Emmanuel Onyeka

    2016-01-01

    Electricity production is often a source of CO2 emissions, for instance when fossil fuel is combusted in power plants. Therefore the root cause of pollution coming from telecommunication industry is the source of energy (diesel genset) the network operators used in running their Base station sites. Energy consumption of using diesel to power base station by telecom networks is a contributor to global greenhouse gas (GHG) emissions. This paper presents the comparative carbon credits of hybrid ...

  10. Preparation of substituting seaweed field mounds accompanying site preparation for No.3 plant in Ikata Nuclear Power Station

    International Nuclear Information System (INIS)

    Ishihara, Hisashi; Oshima, Teruhiko; Fujisaki, Yuichi; Saeki, Taketoshi

    1987-01-01

    Shikoku Electric Power Co., Inc. is constructing No.3 plant adjacently to No.1 and No.2 plants in operation in Ikata Nuclear Power Station. In the coastal area of Iyo-nada, many seaweed fields are distributed, which are important biologically and for fishery. In the works of site preparation for No.3 plant, a part of the site is created by reclamation of sea area, therefore the natural seaweed fields in the area disappear. From the viewpoint of various circumstances and environment preservation, it was decided to create about 60,000 m 2 of seaweed field mounds on the seabed around the site as the substitute for disappearing natural seaweed fields. The Seaweed Field Study Group composed of the men of learning and experience was organized to obtain the guidance on the possibility of creating artificial seaweed fields, the techniques for creation and the effect on environment accompanying the creation of mounds. The creation works were started in October, 1985, and are in progress smoothly utilizing effectively the stones and rocks cut in the site preparation works. The topographic and geological features, sea conditions, the present state of seaweed fields, the experiment on creating artificial seaweed fields, the design and construction of mounds and others are reported. (Kako, I.)

  11. Site development and demands on infrastructure

    International Nuclear Information System (INIS)

    Nieke, K.F.

    1976-01-01

    All sub-fields are examined which form the infrastructure, the infrastructure being indispensable for the site development of a nuclear power plant. The main emphasis is put on the technical infrastructure, but the social infrastructure is dealt with, too. The most important sub-fields are: traffic connections, energy supply, external communications, foundation, building mearures. (UA) [de

  12. Preliminary risk assessment of Power Plant Plomin site contaminated by radioactive slag and ash

    International Nuclear Information System (INIS)

    Skanata, D.; Sinka, D.; Lokner, V.; Schaller, A.

    1996-01-01

    There is a certain number of radioactively contaminated sites in the Republic of Croatia, one of them being known as Power Plant Plomin site, which contains radioactive slag and ash. Due to a relatively high quantity of the deposited material, as well as relatively high population density of the neighbouring area, it is very important to assess the impact of the site on human health and environment. Using RESRAD computer code and PATHRAE method a preliminary assessment of doses and radiation risks for the workers who spend most of their working day at the pile has been performed. PATHRAE method has also been used for the assessment of radiation risks for the neighbouring population. The assessment is preliminary in its character due to the lack of input data. On the basis of assessment results, recommendations are being given comprising measurements to be taken with a view to coming up with the final risk assessment, as well as protective measures which should be undertaken in the meantime. (author)

  13. Predicting local distributions of erosion-corrosion wear sites for the piping in the nuclear power plant using CFD models

    International Nuclear Information System (INIS)

    Ferng, Y.M.

    2008-01-01

    The erosion-corrosion (E/C) wear is an essential degradation mechanism for the piping in the nuclear power plant, which results in the oxide mass loss from the inside of piping, the wall thinning, and even the pipe break. The pipe break induced by the E/C wear may cause costly plant repairs and personal injures. The measurement of pipe wall thickness is a useful tool for the power plant to prevent this incident. In this paper, CFD models are proposed to predict the local distributions of E/C wear sites, which include both the two-phase hydrodynamic model and the E/C models. The impacts of centrifugal and gravitational forces on the liquid droplet behaviors within the piping can be reasonably captured by the two-phase model. Coupled with these calculated flow characteristics, the E/C models can predicted the wear site distributions that show satisfactory agreement with the plant measurements. Therefore, the models proposed herein can assist in the pipe wall monitoring program for the nuclear power plant by way of concentrating the measuring point on the possible sites of severe E/C wear for the piping and reducing the measurement labor works

  14. Cationic Polymers Developed for Alkaline Fuel Cell Applications

    Science.gov (United States)

    2015-01-20

    into five categories: proton exchange membrane fuel cell ( PEMFC ), alkaline fuel cell (AFC), molten carbonate fuel cell (MCFC), solid oxide fuel...SOFC and PAFC belong to high temperature fuel cell, which can be applied in stationary power generation. PEMFC and AFC belong to low temperature fuel...function of the polymer electrolyte is to serve as electrolyte to transport ions between electrodes. PEMFC uses a polymer as electrolyte and works

  15. Wind Characteristics and an Evaluation of Wind Power Density at Three Sites in Egypt

    International Nuclear Information System (INIS)

    Etman, S.M.

    2008-01-01

    This paper presents the results of the analysis of wind speed data for one calendar year (2005) at three stations (El-Tor, El-Nonzha, and El-Notron) in Egypt along with the wind energy potential of each site. The wind power density at 25 m height was obtained by extrapolation of data at 10 m using a Power-law expression. The frequency distribution of observed hourly wind speeds occurring at each station is examined, particularly for wind speeds greater than or equal to 3 and 5 m/s (cut-in wind speeds for most wind turbines). The study reveals that the wind turbine can be operated at the sites El-Tor, El-Nouzha, and El-Notron with an annual availability factor of about 89.9 %, 76.2 %, and 67.9 % if the cut-in wind speed is 3 m/s and 67.2 %,51.8 %, and 17.1 % if the cut-in wind speed is 5 m/s, respectively. The total available wind power density ( kWh/m 2 /yr) Was estimated at the selected sites; El-Tor, El-Nouzha and El-Notron and was found to be: 3838.4, 825.5 and 284 kWh/m 2 /yr for case 3m/s and 2276.2, 489,5 and 71 kWh/m 2 /yr for case 5 m/s, respectively

  16. The discussion of nuclear power plant's cooling chain design for freezing site

    International Nuclear Information System (INIS)

    Hu Jian; Yang Ting; Jiang Xulun

    2014-01-01

    The Component cooling water system (RRI) and Essential service water system (SEC) are composed of Nuclear Power Plant's (NPP) cooling chain, which has its special requirement for freezing site from system design and safety point of view. The feature and difficulty of cooling chain design at freezing condition (when the intake water temperature is below O ℃) are represented. At present, several NPPs are in operation or under construction at freezing site in the world, including Pressurized Water Reactor (PWR) and Canadian Deuterium Uranium reactor (CANDU). By analyzing the thoughts and applicability of different kinds of cooling chain design at freezing site, one solution called 'SEC thermal discharge reflux' is proposed to remove the residual heat from Nuclear Island (NI) into heat sink safely in winter. The solution has been approved by National Nuclear Safety Administration (NNSA) in China and applied in one of CPR NPP in the north of China, which is able to solve several problems compared with the traditional solutions, such as 'Reactor low power operation', 'Reactor start-up for the first time', and 'Changeover of RRI/SEC trains in winter'. The solution is also able to prevent RRI/SEC heat exchanger from icing and avoid low flowrate in SEC pipes. Besides, considering of the economical efficiency, simple operation and control strategy is designed. (authors)

  17. Return on experience on control gates in nuclear power station

    International Nuclear Information System (INIS)

    Valendru, N.

    2009-01-01

    In application of an EDF internal directive, control gates are used at the exit of the Controlled Areas of each nuclear power station site for the radiological control of materials or wastes on pedestrians and vehicles. The author first presents the radiological control chain for people and its principles. This chain comprises the different controls performed within the controlled area, either at the exit of a works area or at the exit of the reactor building, the different controls performed at the exit of the controlled area (depending on the site classification), the control of pedestrians at the site exit, and the 'whole body' anthropo-gamma-metric control. For each of these controls, the authors indicate the detection objectives, the different contamination threshold values, and the type of gate used. In a second part, the authors more precisely present the new C2 gates which include gamma and beta sensors, indicate how control thresholds are adjusted on different power station sites, and discuss the lessons learned after the first years of use of these new gates (difficulties and problems faced as far as detection and detection thresholds are concerned, changes in organization)

  18. Population dose commitments due to radioactive releases from nuclear power plant sites in 1987

    International Nuclear Information System (INIS)

    Baker, D.A.

    1990-08-01

    Population radiation dose commitments have been estimated from reported radionuclide releases from commercial power reactors operating during 1987. Fifty-year dose commitments for a one-year exposure from both liquid and atmospheric releases were calculated for four population groups (infant, child, teen-ager and adult) residing between 2 and 80 km from each of 70 reactor sites. This report tabulates the results of these calculations, showing the dose commitments for both water and airborne pathways for each age group and organ. Also included for reach of the sites is a histogram showing the fraction of the total population within 2 to 80 km around each site receiving various average dose commitments from the airborne pathways. The site average individual dose commitment from all pathways ranged from a low of 2 x 10 -6 mrem to a high of 0.009 mrem. No attempt was made in this study to determine the maximum dose commitment received by any one individual from the radionuclides released at any of the sites. However, licensee calculation of doses to the maximally exposed individual at some sites indicated values of up to approximately 100 times average individual doses (on the order of a few millirem per year). 2 refs., 2 figs., 7 tabs

  19. BKW-FMB: Focus on solar power

    International Nuclear Information System (INIS)

    2005-01-01

    This collection of three short articles present four examples of installations using renewable forms of energy that are operated by the Bernese power utility BKW-FMB in Switzerland. Brief details are given on the company, one of the largest electricity utilities in Switzerland. The first article deals with the photovoltaics (PV) installations on the roof of the new national soccer stadium in Berne and one of the oldest Swiss PV-installations on Mont-Soleil in the Jura mountains. Also covered are the efforts made by the utility and its partners in the area of marketing the power under the trade name '1 to 1 energy'. Information for the general public is provided in visitor centres and also by the solar-powered boat on the Lake of Bienne. A further article deals with wind power from the Mont-Crosin Site in the Jura mountains. The third article describes a hydro-electric power station on the river Aare, which, thanks to measures taken in the ecological area, carries the 'Naturemade Star' label for the power it produces

  20. Evaluation of nuclear power plant siting by probabilistic assessment of environmental impacts

    International Nuclear Information System (INIS)

    Vuori, S.

    1978-01-01

    The work consists of the description of a probabilistic consequence assessment model ARANO, and the individual calculation schemes therein included. This assessment model has been applied to the risk/benefit and cost/benefit analyses of the siting of nuclear power plants. In addition, there have been made some comparisons with the alternative fossil fuelled energy production scenarios. (author)

  1. Site Calibration report

    DEFF Research Database (Denmark)

    Yordanova, Ginka; Vesth, Allan

    The report describes site calibration measurements carried out on a site in Denmark. The measurements are carried out in accordance to Ref. [1]. The site calibration is carried out before a power performance measurement on a given turbine to clarify the influence from the terrain on the ratio...

  2. On site power generation protects water supply for Ajax, Ontario

    Energy Technology Data Exchange (ETDEWEB)

    Morsy, Mohamed

    2011-01-15

    The Ajax water supply plant treats and distribute water for the town of Ajax and the nearby City of Pickering and the operations staff manages two other treatment plants supplying the City of Oshawa and the Town of Whitby, and a dozen pumping stations, reservoirs and elevated tanks. The plant requires around 2 MW of continuous power to supply its 150,000 customers. Although local utility power is reliable, standby generators are mandated by the Ontario Ministry of the Environment. When power goes out problems can result in the plant and system. To avoid these, the Ajax plant staff selected Cummins Power Generation who delivered one 350 kW and two 1500 kW generator sets with automatic transfer switches and paralleling switchgear. These digital systems parallel and synchronize the generator sets with each other and with the utility, which allows the plant to provide continuous service. The plant is designed for twice its current capacity and is ready to handle future requirements.

  3. System transient response to loss of off-site power

    International Nuclear Information System (INIS)

    Sozer, A.

    1990-01-01

    A simultaneous trip of the reactor, main circulation pumps, secondary coolant pumps, and pressurizer pump due to loss of off-site power at the High Flux Isotope Reactor (HFIR) located at the Oak Ridge National Laboratory (ORNL) has been analyzed to estimate available safety margin. A computer model based on the Modular Modeling System code has been used to calculate the transient response of the system. The reactor depressurizes from 482.7 psia down to about 23 psia in about 50 seconds and remains stable thereafter. Available safety margin has been estimated in terms of the incipient boiling heat flux ratio. It is a conservative estimate due to assumed less than available primary and secondary flows and higher than normal depressurization rate. The ratio indicates no incipient boiling conditions at the hot spot. No potential damage to the fuel is likely to occur during this transient. 2 refs., 6 figs

  4. Borehole geophysics in nuclear power plant siting

    International Nuclear Information System (INIS)

    Crosby, J.W.; Scott, J.D.

    1979-01-01

    Miniaturized borehole geophysical equipment designed for use in ground-water investigations can be adapted to investigations of nuclear power plant sites. This equipment has proved to be of value in preliminary and comprehensive studies of interior basins where thick sequences of Quaternary clastic sediment, occasionally with associated volcanic rocks, pose problems of stratigraphic correlation. The unconsolidated nature of the deposits generally requires that exploratory holes be cased, which ordinarily restricts the borehole geophysical studies to the radiation functions--natural gamma, gamma-gamma, neutron-gamma, and neutron-epithermal neutron logs. Although a single log response may be dominant in a given area, correlations derive from consideration of all log responses as a composite group. Because major correlations usually are based upon subtle differences in the physical properties of the penetrated sediment, high-resolution logging procedures are employed with some sacrifice of the quantitative parameters important to petroleum technology. All geophysical field data are recorded as hard copy and as digital information on punched paper tape. Digital data are subsequently computer processed and plotted to scales that enhance the stratigraphic data being correlated. Retention of the data in analog format permits rapid review, whereas computer plotting allows playback and detailed examination of log sections and sequences that may be attenuated on hard copy because of the logarithmic nature of the response to the physical property being examined

  5. Evolution of the Italian regulations and comparison with the other European regulations on the siting of nuclear power plants

    International Nuclear Information System (INIS)

    Nocera, F.; De Lise, P.

    1983-01-01

    The technical and legal criteria as well as procedures relating to the siting of nuclear power plants are given careful attention in most countries due to safety problems and increasing public interest. This paper presents a short survey of the relevant situation in some European countries and describes the developments affecting the legal regime in Italy in recent years. (NEA) [fr

  6. Site selection for controversial projects: reflections on the MRS experience

    International Nuclear Information System (INIS)

    Sigmon, E.B.; Marland, G.

    1987-01-01

    Projects for waste management, power production, and a host of other socially useful functions frequently falter because of local opposition. Students of the siting dilemma have prescribed accommodation of local interests through negotiation and compensation, but they offer little advice on the site selection itself. The negotiated compensation approach to siting frequently fails because localities refuse to negotiate. The authors argue that methods of site selection and developers' initial stance toward local communities affect communities' propensity to negotiate. Site selection strategies and their influence on project acceptability are examined, using the Department of Energy's Monitored Retrievable Storage proposal as a point of departure. 14 refs

  7. US effort on HTS power transformers

    Energy Technology Data Exchange (ETDEWEB)

    Mehta, S., E-mail: shirish.pmehta@spx.com [Waukesha Electric Systems, 400 S. Praire Avenue, Waukesha, WI 53186 (United States)

    2011-11-15

    Fault Current Limiting HTS Transformer development program plan is presented. Benefits of FCL HTS Transformers for power delivery system. Independent program review process is described. Transformer specifications, site requirement described. Waukesha Electric Systems has been working in HTS power transformers development program under the auspices of US Government Department of Energy since 1994. This presentation will describe various milestones for this program and program history along with the lessons learned along the way. Our motivations for working on this development program based on man benefits offered by HTS power transformers to power delivery systems will be discussed. Based on various issues encountered during execution of many HTS projects, DOE has set up an independent program review process that is lead by team of experts. This team reviews are integral part of all DOE HTS projects. Success of all projects would be greatly enhanced by identifying critical issues early in the program. Requiring appropriate actions to mitigate the issues before processing further will lead to proactive interrogation and incorporation of expert's ideas in the project plans. Working of this review process will be also described in this presentation. Waukesha Electric Systems team including: Superpower-Inc, Oak Ridge National Laboratory, University of Houston Center for Superconductivity and Southern California Edison company was awarded a cost share grant by US Government in 2010 for development of a fault current limiting HTS power transformer. This multi year's program will require design, manufacture, installation, and monitoring of a 28 MVA tree phase transformer installed at Irvine CA. Smart Grid demonstration site. Transformer specifications along with requirements for fault current limiting and site requirement will be discussed. Design and development of various sub systems in support of this program including: HTS conductor performance specification

  8. US effort on HTS power transformers

    International Nuclear Information System (INIS)

    Mehta, S.

    2011-01-01

    Fault Current Limiting HTS Transformer development program plan is presented. Benefits of FCL HTS Transformers for power delivery system. Independent program review process is described. Transformer specifications, site requirement described. Waukesha Electric Systems has been working in HTS power transformers development program under the auspices of US Government Department of Energy since 1994. This presentation will describe various milestones for this program and program history along with the lessons learned along the way. Our motivations for working on this development program based on man benefits offered by HTS power transformers to power delivery systems will be discussed. Based on various issues encountered during execution of many HTS projects, DOE has set up an independent program review process that is lead by team of experts. This team reviews are integral part of all DOE HTS projects. Success of all projects would be greatly enhanced by identifying critical issues early in the program. Requiring appropriate actions to mitigate the issues before processing further will lead to proactive interrogation and incorporation of expert's ideas in the project plans. Working of this review process will be also described in this presentation. Waukesha Electric Systems team including: Superpower-Inc, Oak Ridge National Laboratory, University of Houston Center for Superconductivity and Southern California Edison company was awarded a cost share grant by US Government in 2010 for development of a fault current limiting HTS power transformer. This multi year's program will require design, manufacture, installation, and monitoring of a 28 MVA tree phase transformer installed at Irvine CA. Smart Grid demonstration site. Transformer specifications along with requirements for fault current limiting and site requirement will be discussed. Design and development of various sub systems in support of this program including: HTS conductor performance specification

  9. European opportunities for fuel cell commercialisation

    Science.gov (United States)

    Gibbs, C. E.; Steel, M. C. F.

    1992-01-01

    developing European sub-systems, others have chosen to develop their own novel cell technology. This paper will survey the extent of the fuel cell activities in Europe and emphasise the particular markets which fuel cell manufacturers are targeting. Demand for fuel cells in defence and military applications will be the first sector to be commercially viable — European companies such as Siemens, Elenco and VSEL are already marketing AFC or PEM systems for naval and aerospace applications. The small-scale CHP sector is also a likely early market for fuel cell plant. Co-generation fuel cells are of great interest to gas companies like ENAGAS and British Gas looking to promote sales of gas by installing on-site gas-fired generators on their customers' premises. The market for utility scale fuel cell plants is expected to develop later in the decade. The largest demonstration planned for Europe is the 1 MW PAFC for Milan, due to come onstream in 1992. MBB GmbH is considering developing MW-scale MCFC plants with the US company ERC — a 2 MW demonstration is planned for the end of 1993. The potential market for utility fuel cells is large — installation rates could reach 500-1000 MW/year by the turn of the century. Fuel cells will probably not achieve significant use in transport applications in Europe until after the turn of the century unless very stringent emissions legislation for vehicles is introduced. The likely early markets for fuel cells in the transport sector seem to be for delivery and fleet vehicles. Examples of European projects in this area include the Amsterdam city bus project which will use Elenco's AFC technology and Siemens' fork lift truck which will incorporate a PEM fuel cell. Fuel cells also link conveniently with renewable energy systems — coupled with an electrolyser a fuel cell can store solar, wind or wave power. The electrolysis proces is used to generate hydrogen from water at times of surplus energy while the fuel cell consumes hydrogen fuel

  10. On-site quality assurance during erection of a nuclear power plant

    International Nuclear Information System (INIS)

    Mueller, J.

    1976-01-01

    The paper deals with general quality assurance measures, the quality assurance during on-site production (incoming inspection, inspection of welds and welding equipment) and describes in more detail the quality assurance procedures for the containment. (RW) [de

  11. Decisions on sites by Laender parliaments

    International Nuclear Information System (INIS)

    1977-01-01

    The Vereinigung Deutscher Elektrizitaetswerke (VDEW, Association of German Electricity Utilities) proposes two independent steps in the licensing procedure for each nuclear power plant constuction project: one first phase in which to establish site guarantees, and one licensing phase for construction and operation of the power plant. The first phase should henceforth proceed with the active participation of the public involved within the framework of a plans approval procedure. The novel aspect would be the binding clarification in this procedure not only of the nuclear aspects of the case, as formerly, but of all public aspects relating to the site. The construction and operating permits, which would constitute phase two, could then be handled in the usual procedure without any need for urgency. (orig.) [de

  12. 太阳能光伏电站场址选择问题的探讨%Discussion on Site Selection of Solar Photovoitaic Power Station

    Institute of Scientific and Technical Information of China (English)

    毛思禹; 许文年; 侯燕梅; 祝立群; 张成

    2011-01-01

    太阳能是环保、安全的可再生能源,伴随能源危机和环境污染问题的出现受到了越来越广泛的关注.基于太阳能发电的需求,全面认识太阳能光伏发电的原理和光伏发电系统的组成,把握影响光伏电站发电量的因素具有现实意义.结合云南省某光伏电站工程实例,探讨了太阳能光伏电站场址选择的相关技术问题,并对其进行了总结,为太阳能光伏发电场址选择提供借鉴.%As an environmental and safe renewable energy, solar energy attracts extensive attention along with the emergence of energy crisis and environmental pollution. Basing on the demand of solar power generation, it is practically significant to comprehensively understand the principle and system composition of solar photovoltaic power generation, and to grasp the factors affecting output of photovoltaic power station. Combining with an engineering example of photovoltaic power station in Yunnan province, the paper summarizes and probes into the related technical problems of the solar photovoltaic power station's site selection, so as to provide reference for the site selection of solar photovoltaic power generation.

  13. Allowable Residual Contamination Levels in soil for decommissioning the Shippingport Atomic Power Station site

    International Nuclear Information System (INIS)

    Kennedy, W.E. Jr.; Napier, B.A.; Soldat, J.K.

    1983-09-01

    As part of decommissioning the Shippingport Atomic Power Station, a fundamental concern is the determination of Allowable Residual Contamination Levels (ARCL) for radionuclides in the soil at the site. The ARCL method described in this report is based on a scenario/exposure-pathway analysis and compliance with an annual dose limit for unrestricted use of the land after decommissioning. In addition to naturally occurring radionuclides and fallout from weapons testing, soil contamination could potentially come from five other sources. These include operation of the Shippingport Station as a pressurized water reactor, operations of the Shippingport Station as a light-water breeder, operation of the nearby Beaver Valley reactors, releases during decommissioning, and operation of other nearby industries, including the Bruce-Mansfield coal-fired power plants. ARCL values are presented for 29 individual radionculides and a worksheet is provided so that ARCL values can be determined for any mixture of the individual radionuclides for any annual dose limit selected. In addition, a worksheet is provided for calculating present time soil concentration value that will decay to the ARCL values after any selected period of time, such as would occur during a period of restricted access. The ARCL results are presented for both unconfined (surface) and confined (subsurface) soil contamination. The ARCL method and results described in this report provide a flexible means of determining unrestricted-use site release conditions after decommissioning the Shippingport Atomic Power Station

  14. The activities of the IAEA in nuclear power station site studies

    International Nuclear Information System (INIS)

    Farges, L.

    1980-01-01

    This short review of IAEA activities in nuclear power station site studies gives the impression of a multiform action of unequal importance according to the projects and geographically very dispersed. It should be realised that the Agency does not possess the initiative in the development of this action and is dependent upon its member states for the preparation and finalizing of programmes, and it cannot undertake studies on the spot without the formal request of the state concerned. Furthermore, it does not have limitless means and a selection is made among the requests from the various member states which sometimes takes into account criteria other than those of a scientific or technical nature [fr

  15. Guidebook on the introduction of nuclear power

    International Nuclear Information System (INIS)

    1982-01-01

    This ''Guidebook on the Introduction of Nuclear Power'' has been structured into three parts. The first part contains a survey of nuclear power, with the objective of providing general background information to the reader on the present status and future prospects of nuclear power and on the technical and economic aspects of available power reactor types and nuclear fuel cycles. In the second part of the Guidebook, the special aspects and considerations relevant to the introduction of nuclear power in a country are discussed. The subject is subdivided into three main headings: the technical aspects and national requirements; the safety and environmental considerations; and the international aspects of nuclear power. Emphasis is placed on the tasks to be performed within the country introducing nuclear power, on responsibilities that cannot be delegated and on the need for adequate national infrastructures and long-term commitments. Finally, the third part of the Guidebook contains more detailed information and guidance on the planning and preparatory stages of launching a first nuclear power project, including in particular: nuclear power programme planning, siting, feasibility studies, bidding and contracting. Design, construction and operation are covered in a brief overview for the sake of completeness

  16. Projecting labor demand and worker immigration at nuclear power plant construction sites: an evaluation of methodology

    International Nuclear Information System (INIS)

    Herzog, H.W. Jr; Schlottmann, A.M.; Schriver, W.R.

    1981-12-01

    The study evaluates methodology employed for the projection of labor demand at, and worker migration to, nuclear power plant construction sites. In addition, suggestions are offered as to how this projection methodology might be improved. The study focuses on projection methodologies which forecast either construction worker migration or labor requirements of alternative types of construction activity. Suggested methodological improvements relate both to institutional factors within the nuclear power plant construction industry, and to a better use of craft-specific data on construction worker demand/supply. In addition, the timeliness and availability of the regional occupational data required to support, or implement these suggestions are examined

  17. The research on the material management system in nuclear power plant construction process

    International Nuclear Information System (INIS)

    Liu Xuegeng; Huang Zhongping

    2010-01-01

    According to the module construction speciality of nuclear power plant, this article analyzes the relationship between the actual amount of the material transported to the construction site and the planed needs of the material, and points out the zero inventory management target in the nuclear power plant construction site. Based on this, the article put forward a nuclear power plant material management system which is based on the 'pull' information driver. This system is composed by material coding sub-system, procurement and site material integrated management sub-system and project control sub-system, and is driven by the material demand from construction site to realize the JIT purchasing. This structure of the system can reduce the gap between the actual amount of the material transported to the site and the planed needs of the material and achieve the target of reducing storage at construction site. (authors)

  18. Commercial feasibility of fusion power based on the tokamak concept

    International Nuclear Information System (INIS)

    Reid, R.L.; Steiner, D.

    1977-01-01

    The impact of plasma operating characteristics, engineering options, and technology on the capital cost trends of tokamak power plants is determined. Tokamak power systems are compared to other advanced energy systems and found to be economically competitive. A three-phase strategy for demonstrating commercial feasibility of fusion power, based on a common-site multiple-unit concept, is presented

  19. Demands and criteria for the site selection from the view of the power plant owners

    International Nuclear Information System (INIS)

    Beising, R.; Staebler, K.

    1976-01-01

    The methods as shown by the concrete example of the site provision plan for Baden-Wuerttemberg have proved extremely useful. The pragmatic method of site selection which ensures as little clash of interests as possible between the power plant and other preservation interests such as e.g. environment preservation, recreation areas, development axes, water economics is the only possible method for the densely populated areas of the Federal Republic. The numerous physical constraints in our Land only allow an optimisation of site search within the limited possibilities. (HP) [de

  20. Comparative Analysis of Site-Selection Process for Power Plants in Korea: Cases of Thermal, Nuclear, and Renewable Energies

    International Nuclear Information System (INIS)

    Kang, M.; Lee, M.; Yoon, J. W.; Choi, H. C.; Chu, C.; Lee, H.; Park, J.

    2017-01-01

    There are various conflicts related to power generation facilities; however, the conflicts that arise during the process of luring facilities or site selection, as in the previous cases, can eventually influence greatly the implementation of the national energy policy or strategy. This study analyzed the conflict phenomenon that occurred in the site selection policy of the power generation facilities through the case studies. We selected the most recent conflict cases by each energy source, identified the qualitative context characteristics of the cases and tried to suggest the policy leverages. In this study, it is concluded that the cause of conflicts in decision making system for site selection of power plants is insufficient yet due to the variable circumstances such as environmental events, stakeholder range, etc. However, the conclusions obtained from the case study are difficult generalization without specific prescription books, so further studies for those areas are required.

  1. Rock siting of nuclear power plants from a reactor safety standpoint. Status report October 1974

    International Nuclear Information System (INIS)

    1975-01-01

    The aim of this study is to clearify the advantages and disadvantages of an underground nuclear power plant from a reactor safety point of view, compared to a plant above ground. Principles for the technical design of a rock sited BWR nuclear power plant is presented. Also questions of sabotage and closing down the plant at the end of the operational period are treated. (K.K.)

  2. Population dose commitments due to radioactive releases from Nuclear-Power-Plant Sites in 1979

    International Nuclear Information System (INIS)

    Baker, D.A.; Peloquin, R.A.

    1982-12-01

    Population radiation dose commitments have been estimated from reported radionuclide releases from commercial power reactors operating during 1979. Fifty-year dose commitments from a one-year exposure were calculated from both liquid and atmospheric releases for four population groups (infant, child, teen-ager and adult) residing between 2 and 80 km from each site. This report tabulates the results of these calculations, showing the dose commitments for both liquid and airborne pathways for each age group and organ. Also included for each site is a histogram showing the fraction of the total population within 2 to 80 km around each site receiving various average dose commitments from the airborne pathways. The total dose commitment from both liquid and airborne pathways ranged from a high of 1300 person-rem to a low of 0.0002 person-rem with an arithmetic mean of 38 person-rem. The total population dose for all sites was estimated at 1800 person-rem for the 94 million people considered at risk. The average individual dose commitment from all pathways on a site basis ranged from a low of 2 x 10 - 6 mrem to a high of 0.7 mrem. No attempt was made in this study to determine the maximum dose commitment received by any one individual from the radionuclides released at any of the sites

  3. Report from investigation committee on the accident at the Fukushima Nuclear Power Stations of Tokyo Electric Power Company

    International Nuclear Information System (INIS)

    Koshizuka, Seiichi

    2012-01-01

    Government's Investigation Committee on the Accident at Fukushima Nuclear Power Stations of Tokyo Electric Power Company published its final report on July 23, 2012. Results of investigation combined final report and interim report published on December 26, 2011. The author was head of accident accuse investigation team mostly in charge of site response, prior measure and plant behavior. This article reported author related technical investigation results focusing on site response and prior measures against tsunamis of units 1-3 of Fukushima Nuclear Power Stations. Misunderstanding of working state of isolation condenser of unit 1, unsuitability of alternative water injection at manual stop of high-pressure coolant injection (HPCI) system of unit 3 and improper prior measure against tsunami and severe accident were pointed out in interim report. Improper monitoring of suppression chamber of unit 2 and again unsuitable work for HPCI system of unit 3 were reported in final report. Thorough technical investigation was more encouraged to update safety measures of nuclear power stations. (T. Tanaka)

  4. 77 FR 29701 - Impact of Construction (Under a Combined License) of New Nuclear Power Plant Units on Operating...

    Science.gov (United States)

    2012-05-18

    ... New Nuclear Power Plant Units on Operating Units at Multi-Unit Sites AGENCY: Nuclear Regulatory... construct and operate new nuclear power plants (NPPs) on multi-unit sites to provide an evaluation of the... License) of New Nuclear Power Plants on Operating Units at Multi-Unit Sites (Package). ML112630039 Federal...

  5. Less is more: Strategic scale site suitability for concentrated solar thermal power in Western Australia

    International Nuclear Information System (INIS)

    Dawson, Lucas; Schlyter, Peter

    2012-01-01

    Concentrated Solar Thermal Power (CSP) represents a technology with a great deal of promise for low-emissions electricity generation. Several recent studies have identified large swathes of the world’s ‘sunbelt’ as technically suitable for the technology, but current estimates grossly overestimate site suitability for CSP. There is a need for more realistic suitability estimations in order to provide a more accurate basis for policy and investment decisions. This paper establishes a generally applicable GIS-based methodology to better enable identification of CSP-suitable sites at the continental scale. We test the methodology, identifying a large number of CSP suitable sites in Western Australia (WA). Our results indicate a 99.4% reduction from technically suitable areas to areas showing medium-to-very-high suitability in the current and near term in WA. The availability of infrastructure is critical to site suitability and the introduction of new major loads and infrastructure in currently under-developed regions is likely to open up further areas with medium to very high suitability. Despite the fact that current global/continental scale estimates of CSP potentials are likely overestimated by at least two orders of magnitude, truly CSP-suitable areas remain more than sufficient to motivate investment in utility-scale CSP and power potentials from this technology remain enormous. - Highlights: ► 1.78 million km 2 of Western Australia is identified as technically suitable. ► Hypothetical production potential of technically suitable area ≈908,000 TW h/year. ► Only 0.6% of technically suitable areas considered to be medium-very highly suitable. ► Site suitability highly dependent on availability of infrastructure and load. ► Suitable areas still more than sufficient to motivate CSP production.

  6. Hinkley Point 'C' power station public inquiry: proof of evidence on potential off-site effects of radiation

    International Nuclear Information System (INIS)

    Western, D.J.

    1988-09-01

    A public inquiry has been set up to examine the planning application made by the Central Electricity Generating Board (CEGB) for the construction of a 1200 MW Pressurized Water Reactor power station at Hinkley Point (Hinkley Point ''C'') in the United Kingdom. This evidence to the Inquiry is concerned with the potential of the proposed Hinkely Point ''C'' PWR to increase the exposure of members of the public offsite to radiation. The policy is to replicate the design of the Sizewell ''B'' reactor. The evidence examined in great detail at the Sizewell ''B'' Public Inquiry where the Inspector concluded that the risk would be very small. The purpose of this evidence is to provide an explicit account of the potential off-site effects of radiation at the Hinkley Point site, so that it can be seen that there is nothing specific to this location that could lead to a different conclusion. (author)

  7. Relationship between regional planning and site finding of power stations with regard to energy supply

    International Nuclear Information System (INIS)

    Hoppe, I.

    1980-01-01

    Based on the discussion on energy policy generally brought in the fore, spatial relationships are discussed especially in the field of electricity supply. A review is given of the legal systematism in which electricity supply and regional planning are to be found. How state planners organize the provision with sites for high-capacity thermal power stations is described as the concrete development of systematic legal relationships, concepts of, and opportunities for, state and regional planning. In the main part, this paper focusses on the analysis of the course of development power station construction and the distribution system have taken with regard to the question as to whether and to what extent this technological character is also responsible for an emerging structure in which these plants are mainly centred in a special region. (orig.) [de

  8. Controlling engineering project changes for multi-unit, multi-site standardized nuclear power plants

    International Nuclear Information System (INIS)

    Randall, E.; Boddeker, G.; McGugin, H.; Strother, E.; Waggoner, G.

    1978-01-01

    Multibillioin dollar multiple nuclear power plant projects have numerous potential sources of engineering changes. The majority of these are internally generated changes, client generated changes, and changes from construction, procurement, other engineering organizations, and regulatory organizations. For multiunit, multisite projects, the use of a standardized design is cost effective. Engineering changes can then be controlled for a single standardized design, and the unit or site unique changes can be treated as deviations. Once an effective change procedure is established for change control of the standardized design, the same procedures can be used for control of unit or site unique changes

  9. Study on nuclear power introduction into Vietnam

    International Nuclear Information System (INIS)

    Vuong Huu Tan

    2000-01-01

    The report presents main results of the study on nuclear power introduction into Vietnam which have been carried out at Vietnam Atomic Energy Commission in collaboration with Ministry of Industry of Vietnam and other countries like Japan, Canada and Korea. The study covers all topics related to the nuclear power introduction into Vietnam such as electricity demands and supply, economics, finance, technology, safety, manpower, site selection etc. (author)

  10. Site Selection Strategy of Single-Frequency Tuned R-APF for Background Harmonic Voltage Damping in Power Systems

    DEFF Research Database (Denmark)

    Sun, Xiaofeng; Zeng, Jian; Chen, Zhe

    2013-01-01

    , and analyze the harmonic voltage propagation caused by the background harmonic voltage in power systems. Then, a new strategy is proposed for the site selection of resistive active power filter to damp the background harmonic voltage in power systems. Experiments have been performed to verify the theoretical......Series resonance between capacitance and line inductance may magnify background harmonic voltage and worsen the harmonic voltage distortion in power systems. To solve this problem, in this paper, the transmission line theory is used to set up the distributed parameter model of power system feeders...

  11. Population dose commitments due to radioactive releases from nuclear power plant sites in 1988

    International Nuclear Information System (INIS)

    Baker, D.A.

    1992-01-01

    Population radiation dose commitments have been estimated from reported radionuclide releases from commercial power reactors operating during 1988. Fifty-year commitments for a one-year exposure from both liquid and atmospheric releases were calculated for four population groups (infant, child, teen-ager and adult) residing between 2 and 80 km from each of 71 reactor sites. This report tabulates the results of these calculations, showing the dose commitments for both water and airborne pathways for each age group and organ. Also included for each of the sites is a histogram showing the fraction of the total population within 2 to 80 km around each site receiving various average dose commitments from the airborne pathways. The total collective dose commitments (from both liquid and airborne pathways) for each site ranged from a high of 16 person-rem to a low of 0.0011 person-rem for the sites with plants operating throughout the year with an arithmetic mean of 1.1 person-rem. The total population dose for all sites was estimated at 75 person-rem for the 150 million people considered at risk. The site average individual dose commitment from all pathways ranged from a low of 3 x 10 -7 mrem to a high of 0.02 mrem. No attempt was made in this study to determine the maximum dose commitment received by any one individual from the radionuclides released at any of the sites. However, licensee calculation of doses to the maximally exposed individual at some sites indicated values of up to approximately 100 times average individual doses (on the order of a few millirem per year)

  12. Fuel cell technology; Brennstoffzellen-Technologie

    Energy Technology Data Exchange (ETDEWEB)

    Stimming, U; Friedrich, K A; Cappadonia, M; Vogel, R

    1999-12-31

    Hydrogen from fossil or renewable sources is an important fuel for low-emission power generation in fuel cells. Methanol and maybe also ethanol can also be produced by direct electrochemical processes in low-temperature fuel cells (PEMFC, PAFC). Fuel cell systems with high operating temperatures are highly flexible with regard to fuel but tend to have material problems. On the other hand, rapid developments in materials development and the possibility of production technology transfer from the electronics industry lead one to expect a breakthrough in the near future. But in spite of this, niche market applications will prevail. Since power stations have a longer life than motor vehicles and fuel cells in mobile applications, emission reductions from fuel cell applications in road vehicles are more probable on a medium-term basis than from applications in power stations. (orig.) [Deutsch] Wasserstoff, der sowohl aus fossilen wie auch aus regenerativen Quellen erschlossen werden kann, ist ein wesentlicher Brennstoff fuer die emissionsarme Elektrizitaetsproduktion in Brennstoffzellen. Methanol und eventuell Ethanol koennen auch direkt elektrochemisch in Niedertemperaturbrennstoffzellen (PEMFC, PAFC) umgesetzt werden. Brennstoffzellensysteme mit hohen Betriebstemperaturen erlauben eine hohe Flexibilitaet bezueglich der verwendeten Brennstoffe, sind aber nach wie vor durch starke Materialprobleme belastet. Die enormen Fortschritte in der Materialentwicklung einerseits sowie ein moeglicher Transfer von Fertigungstechnologien aus der Elektronikindustrie andererseits lassen eine zukuenftige grosstechnische Nutzung von Brennstoffzellen erwarten. Die technische Einfuehrung wird dennoch nur ueber Nischenmaerkte moeglich sein. Da die mittlere Lebensdauer eines Kraftwerks deutlich hoeher ist als die eines Strassenfahrzeugs, ausserdem Brennstoffzellen auch in staerkerem Masse in Fahrzeugen eingesetzt werden koennen, sind mittelfristig Emissionen eher durch

  13. Site selection for nuclear power plants

    International Nuclear Information System (INIS)

    Ehjchkholz, D.

    1980-01-01

    Problem of NPP site selection in the USA including engineering factors, radiation and environmental protection factors is stated in detail. Floating and underground sites are considered especially. The attention in paid to waste storage and risk criterium in siting [ru

  14. Cold shock to aquatic organisms: guidance for power-plant siting, design, and operation

    International Nuclear Information System (INIS)

    Coutant, C.C.

    1977-01-01

    Problems of cold-shock damages to aquatic organisms have arisen at some condenser cooling-water discharges of thermal power stations when the warm-water releases have suddenly terminated. The basis for such damage lies in the exposure of resident organisms to a rapid decrease in temperature and a sustained exposure to low temperature that induces abnormal behavioral or physiological performance and often leads to death. Although some spectacular fish kills from cold shock have occurred, the present knowledge of the hydraulic and biological processes involved can provide guidance for the siting, design, and operation of power-plant cooling systems to minimize the likelihood of significant cold-shock effects. Preventing cold-shock damages is one consideration in minimizing overall environmental impacts of power-plant cooling and in balancing plant costs with environmental benefits

  15. On-site voltage measurement with capacitive sensors on high voltage systems

    NARCIS (Netherlands)

    Wu, L.; Wouters, P.A.A.F.; Heesch, van E.J.M.; Steennis, E.F.

    2011-01-01

    In Extra/High-Voltage (EHV/HV) power systems, over-voltages occur e.g. due to transients or resonances. At places where no conventional voltage measurement devices can be installed, on-site measurement of these occurrences requires preferably non intrusive sensors, which can be installed with little

  16. Evaluation of the impact of a committed site on fusion reactor development

    International Nuclear Information System (INIS)

    Reid, R.L.; Nagy, A.

    1979-01-01

    The technical and economic merits of a committed fusion site for development of tokamak, mirror, and EBT reactor from ignition through demo phases were evaluated. Schedule compression resulting from evolving several reactor concepts and/or phases on a committed site as opposed to sequential use of independent sites was estimated. Land, water, and electrical power requirements for a committed fusion site were determined. A conceptual plot plan for siting three fusion reactors on a committed site was configured. Reactor support equipment common to the various concepts was identified as candidates for sharing. Licensing issues for fusion plants were briefly addressed

  17. Hydrologic design methodologies for small-scale hydro at ungauged sites. Phase 2A, British Columbia. Primer for Integrated Method for Power Analysis (IMP)

    Energy Technology Data Exchange (ETDEWEB)

    1986-01-01

    This report provides a user's manual for the Integrated Method for Power Analysis (IMP) series of programs, developed to aid in evaluating small-scale hydroelectric power sites in British Columbia. The primary objective of IMP is to address the problem posed by hydroelectric development at sites completely lacking in streamflow records. The province's mountainous terrain, with numerous microclimates, precluded methods of regional analysis based on regression or comparisons with gauged streams; instead, a conceptual model of physical processes on the land and in the atmosphere was used as a basis for developing IMP. The IMP package consists of five basic components: an atmospheric model of annual precipitation and 1-in-10-year 24-h maximum rainfall; a watershed model that will generate a daily series of streamflow data; a flood frequency analysis system that uses site-specific topographical information and information from the atmospheric model to generate the flood frequency curve; a hydroelectric power simulation program which determines the daily energy output for a run-of-river or reservoir storage site; and a graphics analysis package which provides direct visualization of atmospheric and streamflow data, and the results of watershed and power simulation modelling. Within each component of the program, the program requirements and capabilities are discussed. A series of sample screens are shown, illustrating the use of the IMP package for a particular simulation. 18 figs., 2 tabs.

  18. The feasibility of mobile computing for on-site inspection.

    Energy Technology Data Exchange (ETDEWEB)

    Horak, Karl Emanuel; DeLand, Sharon Marie; Blair, Dianna Sue

    2014-09-01

    With over 5 billion cellphones in a world of 7 billion inhabitants, mobile phones are the most quickly adopted consumer technology in the history of the world. Miniaturized, power-efficient sensors, especially video-capable cameras, are becoming extremely widespread, especially when one factors in wearable technology like Apples Pebble, GoPro video systems, Google Glass, and lifeloggers. Tablet computers are becoming more common, lighter weight, and power-efficient. In this report the authors explore recent developments in mobile computing and their potential application to on-site inspection for arms control verification and treaty compliance determination. We examine how such technology can effectively be applied to current and potential future inspection regimes. Use cases are given for both host-escort and inspection teams. The results of field trials and their implications for on-site inspections are discussed.

  19. Evaluation of water quality parameters and associated environmental impact at nuclear power plant sites

    International Nuclear Information System (INIS)

    Joshi, M.L.; Hegde, A.G.

    2005-01-01

    The Nuclear Power Plants use a large quantity of water for the purpose of cooling the turbine condenser. The heated effluents are discharged to aquatic environment by means of once through cooling wherever large water bodies like seacoast or fresh water reservoir are available. The quality of water bodies are important for the growth and biodiversity of aquatic organisms. Several environmental factors like Temperature pH, Dissolved Oxygen have a bearing on the life cycle of aquatic organisms. The paper describes the evaluation of water quality parameters at the two typical sites one on the sea coast (Tarapur) and other at inland site Kaiga and discusses the environmental impact due to discharge to aquatic environment. It is found that the environmental impacts due to both heated effluents and radioactivity are insignificant. The water quality parameters are found to be well within the prescribed standards. (author)

  20. Population dose commitments due to radioactive releases from nuclear power plant sites in 1983

    International Nuclear Information System (INIS)

    Baker, D.A.; Peloquin, R.A.

    1987-04-01

    Population radiation dose commitments have been estimated from reported radionuclide releases from commercial power reactors operating during 1983. Fifty-year dose commitments from a one-year exposure were calculated from both liquid and atmospheric releases for four population groups (infant, child, teen-ager and adult) residing between 2 and 80 km from each of 52 sites. This report tabulates the results of these calculations, showing the dose commitments for both liquid and airborne pathways for each age group and organ. Also included for each of the sites is a histogram showing the fraction of the total population within 2 to 80 km around each site receiving various average dose commitments from the airborne pathways. The total dose commitments (from both liquid and airborne pathways) for each site ranged from a high of 45 person-rem to a low of 0.002 person-rem for the sites with plants operating throughout the year with an arithmetic mean of 3 person-rem. The total population dose for all sites was estimated at 170 person-rem for the 100 million people considered at risk

  1. Wind Energy Potential and Power Law Indexes Assessment for Selected Near-Coastal Sites in Malaysia

    Directory of Open Access Journals (Sweden)

    Aliashim Albani

    2017-03-01

    Full Text Available This paper investigated the wind energy potential by analysing a certain amount of gathered 10-min measured data at four stations located at coastal sites in Malaysia, i.e., Kudat, Mersing, Kijal, and Langkawi. The wind data are collected from a total of four new wind measurement masts with sensors mounted at various heights on the tower. The measured data have enabled the establishment of wind resource maps and the power law indexes (PLIs analysis. In addition, the dependence of PLI upon surface temperature and terrain types is studied, as they are associated to the form of exponential fits. Moreover, the accuracy of exponential fits is assessed by comparing the results with the 1/7 law via the capacity factor (CF discrepancies. In order to do so, the wind turbine with a hub-height similar to the maximum height of the measured data at each site is selected to simulate energy production. Accordingly, the discrepancy of CF based on the extrapolated data by employing 1/7 laws and exponential fits, in spite of being computed using measured data, is determined as well. Furthermore, the large discrepancy of the wind data and the CF, which has been determined with the application of 1/7, is compared to the exponential fits. This is because; discrepancy in estimation of vertical wind speed could lead to inaccurate CF computation. Meanwhile, from the energy potential analysis based on the computed CF, only Kudat and Mersing display a promising potential to develop a medium capacity of wind turbine power, while the other sites may be suitable for wind turbines at a small scale.

  2. Eddy Covariance Measurements of Methane Flux at Remote Sites with New Low-Power Lightweight Fast Gas Analyzer

    Science.gov (United States)

    Xu, Liukang; Burba, George; Schedlbauer, Jessica; Zona, Donatella; McDermitt, Dayle K.; Anderson, Tyler; Oberbauer, Steven; Oechel, Walter; Komissarov, Anatoly; Riensche, Brad

    2010-05-01

    Majority of natural methane production happens at remote unpopulated areas in ecosystems with little or no infrastructure or easily available grid power, such as arctic and boreal wetlands, tropical mangroves, etc. Present approaches for direct measurements of CH4 fluxes rely on fast closed-path analyzers, which have to work under significantly reduced pressures, and require powerful pumps and grid power. Power and labor demands may be reasons why CH4 flux is often measured at locations with good infrastructure and grid power, and not with high CH4 production. An instrument was developed to allow Eddy Covariance measurements of CH4 flux with power consumption 30-150 times below presently available technologies. This instrument, LI-7700, uses proposed extremely low-power technology would allows placing methane Eddy Covariance stations in the middle of the source (wetland, rice paddy, forest, etc.) in the absence of the grid power. This could significantly expand the Eddy Covariance CH4 flux measurements coverage, and possibly, significantly improve the budget estimates of world CH4 emissions and budget. Various prototypes of the LI-7700 were field-tested for three seasons at the remote site in middle of Everglades National Park (Florida, USA) using solar panels, at three stationary and several mobile sites during three seasons at remote Arctic wetlands near Barrow (Alaska, USA), in the tropical mangroves near La Paz (Mexico) using portable generator, and in bare agricultural field near Mead (Nebraska, USA) during 2005 through 2010. Latest data on CH4 concentration, co-spectra and fluxes, and latest details of instrumental design are examined in this presentation. Overall, hourly methane fluxes ranged from near-zero at night to about 4 mg m-2 h-1 in midday in arctic tundra. Observed fluxes were within the ranges reported in the literature for a number of wetlands in North America, including the Everglades wetlands. Diurnal patterns were similar to those measured by

  3. Site organization and site arrangement

    International Nuclear Information System (INIS)

    Boissonnet, B.; Macqueron, J.F.

    1976-01-01

    The present paper deals with criteria for the choice of a production unit or power plant site, the organization and development of a site in terms of its particular characteristics and takes into account personnel considerations in site organizations as well as the problem of integrating the architecture into the environment. (RW) [de

  4. Population dose commitments due to radioactive releases from nuclear-power-plant sites in 1978

    International Nuclear Information System (INIS)

    Peloquin, R.A.; Schwab, J.D.; Baker, D.A.

    1982-06-01

    Population radiation dose commitments have been estimated from reported radionuclide releases from commercial power reactors operating during 1978. Fifty-year dose commitments from a one-year exposure were calculated from both liquid and atmospheric releases for four population groups (infant, child, teen-ager and adult) residing between 2 and 80 km from each site. This report tabulates the results of these calculations, showing the dose commitments for both liquid and airborne pathways for each age group and organ. Also included for each site is a histogram showing the fraction of the total population within 2 to 80 km around each site receiving various average dose commitments from the airborne pathways. The total dose commitment from both liquid and airborne pathways ranged from a high of 200 person-rem to a low of 0.0004 person-rem with an arithmetic mean of 14 person-rem. The total population dose for allsites was estimated at 660 person-rem for the 93 million people considered at risk. The average individual dose commitment from all pathways on a site basis ranged from a low of 3 x 10 -6 mrem to a high of 0.08 mrem. No attempt was made in this study to determine the maximum dose commitment received by any one individual from the radionuclides released at any of the sites

  5. Technical guidance for siting criteria development

    International Nuclear Information System (INIS)

    Aldrich, D.C.; Sprung, J.L.; Alpert, D.J.

    1982-12-01

    Technical guidance to support the formulation and comparison of possible siting criteria for nuclear power plants has been developed in four areas: (1) consequences of hypothetical severe nuclear-power-plant accidents, (2) characteristics of population distributions about current reactor sites, (3) site availability within the continental United States, and (4) socioeconomic impacts of reactor siting. The impact on consequences of source-term magnitude, meteorology, population distribution, and emergency response have been analyzed. Population distributions about current sites were analyzed to identify statistical characteristics, time trends, and regional differences. A site-availability data bank was constructed for the continential United States. The data bank contains information about population densities, seismicity, topography, water availability, and land-use restrictions. Finally, the socioeconomic impacts of rural-industrialization projects, energy boomtowns, and nuclear power plants were examined to determine their nature, magnitude, and dependence on site demography and remoteness

  6. Technical guidance for siting criteria development

    Energy Technology Data Exchange (ETDEWEB)

    Aldrich, D.C.; Sprung, J.L.; Alpert, D.J.; Diegert, K.; Ostmeyer, R.M.; Ritchie, L.T.; Strip, D.R.; Johnson, J.D.; Hansen, K.; Robinson, J.

    1982-12-01

    Technical guidance to support the formulation and comparison of possible siting criteria for nuclear power plants has been developed in four areas: (1) consequences of hypothetical severe nuclear-power-plant accidents, (2) characteristics of population distributions about current reactor sites, (3) site availability within the continental United States, and (4) socioeconomic impacts of reactor siting. The impact on consequences of source-term magnitude, meteorology, population distribution, and emergency response have been analyzed. Population distributions about current sites were analyzed to identify statistical characteristics, time trends, and regional differences. A site-availability data bank was constructed for the continential United States. The data bank contains information about population densities, seismicity, topography, water availability, and land-use restrictions. Finally, the socioeconomic impacts of rural-industrialization projects, energy boomtowns, and nuclear power plants were examined to determine their nature, magnitude, and dependence on site demography and remoteness.

  7. Hydrologic design methodologies for small-scale hydro at ungauged sites. Phase 2A, British Columbia. Summary report. Integrated method for power analysis (IMP)

    Energy Technology Data Exchange (ETDEWEB)

    1986-01-01

    Analysis of the feasibility of sites for small-scale hydroelectric power generation in British Columbia can be a difficult process in cases where gauged streamflow data are not available. This report outlines the capabilities of a package of computer programs, designed to aid the planner of small-scale hydro projects in evaluating the hydrology and energy potential of ungauged sites in that province. The programs were developed by using appropriate programming and hydrological research that had already been done, and taking advantage of experience already available from previous use of components of the package. As the province's mountainous terrain, with numerous microclimates, precluded use of methods of regional analysis based on regression or comparison with gauged streams, the package was developed on the basis of a conceptual model of physical processes on the land and in the atmosphere. The resulting package, the Integrated Method for Power Analysis, consists of five basic components: an atmospheric model of annual precipitation and one-in-ten-year 24-h maximum rainfall; a watershed model that will generate streamflow data based on information from the atmospheric model; a flood frequency analysis system that uses site-specific topographic information and information from the atmospheric model to generate a flood frequency curve; a hydroelectric power simulation program which determines the daily energy output for a run-of-river or reservoir storage site; and a graphics analysis package that provides direct visualization of atmospheric and streamflow data, and the results of watershed and power simulation modelling. 2 figs., 1 tab.

  8. Power plant site evaluation - Douglas Point site. Volume 1, part 2. Final report

    International Nuclear Information System (INIS)

    1977-11-01

    This is part of a series of reports containing an evaluation of the proposed Douglas Point nuclear generating station site located on the Potomac River in Maryland 30 miles south of Washington, DC. This report contains sections on cooling tower air emissions, noise impacts, transmission line effects, radiation from normal releases, site features affecting radiological accidents, and meteorology

  9. A Hybrid Approach to Tactical Vehicles

    Science.gov (United States)

    2011-09-01

    membrane fuel cell ( PEMFC ), molten carbonate fuel cell (MCFC), solid oxide fuel cell (SOFC), phosphoric acid fuel cell (PAFC), alkaline fuel cell (AFC...and the direct methanol fuel cell (DMFC) (Ehsani, Gao, & Emadi, 2010). Of the six major types of fuel cells; the PEMFC , SOFC, and AFC are... PEMFC (21st Century Truck Program, 2000). There are a number of advantages of using a fuel cell as the primary power source for a vehicle. All fuel

  10. Ichthyoplankton entrainment at Wylfa power station, Anglesey and implications for a further siting proposal

    International Nuclear Information System (INIS)

    Dempsey, C.H.; Rogers, S.I.

    1989-07-01

    A 12 month survey of ichthyoplankton in the cooling water system of Wylfa Power Station and the surrounding 40 km 2 of sea, was carried out between October 1986 and September 1987. The larvae of 31 species and the eggs of 8 species were identified in the survey. Samples taken from the cooling water system and by boat from offshore were largely similar in respect of species diversity and density. Estimates of annual losses due to entrainment are given both in terms of immediate losses and consequential losses of adults to the population. Estimates of losses of six commercially exploited species are considered in terms of loss to the commercial fishery. Assuming the 'worst case' of a 100% mortality of eggs and larvae passing through the cooling system, losses of ichthyoplankton due to entrainment at the existing 'magnox' nuclear power station at Wylfa Point are small and could have no significant adverse effect on fish populations of those species entrained. The operation of the proposed 'pressurised water reactor' nuclear power station on the same site would increase losses by up to 100%. Such an increase would still not alter the existing situation. No significant adverse effect is likely. (author)

  11. Feasibility Study of Economics and Performance of Solar Photovoltaics at the Brisbane Baylands Brownfield Site in Brisbane, California. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    Energy Technology Data Exchange (ETDEWEB)

    Salasovich, J.; Geiger, J.; Healey, V.; Mosey, G.

    2013-04-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Brisbane Baylands site in Brisbane, California, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.

  12. Reliability of the electric power supply in the safety apparatus of nuclear power plants: a comparative analysis

    International Nuclear Information System (INIS)

    Cruz, L.A.

    1992-01-01

    This paper discusses the risk of total loss of electric power supply to the Class 1E system. Two alternatives are focused: a system with two off-site and two onsite power supplies emergency power supply, as recommended by the American Regulations, and a system with only one off-site and four on-site power supplies, applicable when two off-site are not available. To allow the fact that the equipment can be repaired, the method proper involves use of the Markov model, with which one can find, for each configuration of the system, the change over time of the probability of a simultaneous failure of all power sources. The sensitivity of each parameter is studied in each case and, on the basis of the results of the study, the author conclude that the system with two off-site power supplies is preferable in all alternatives analysed, although the system with one off-site power supply can be adopted with high reliability diesel-generators. (author)

  13. Ultra Efficient CHHP Using a High Temperature Fuel Cell to Provide On-Site Process Reducing Gas, Clean Power, and Heat

    Energy Technology Data Exchange (ETDEWEB)

    Jahnke, Fred C. [Fuelcell Energy, Inc., Danbury, CT (United States)

    2015-06-30

    FuelCell Energy and ACuPowder investigated and demonstrated the use of waste anode exhaust gas from a high temperature fuel cell for replacing the reducing gas in a metal processing furnace. Currently companies purchase high pressure or liquefied gases for the reducing gas which requires substantial energy in production, compression/liquefaction, and transportation, all of which is eliminated by on-site use of anode exhaust gas as reducing gas. We performed research on the impact of the gas composition on product quality and then demonstrated at FuelCell Energy’s manufacturing facility in Torrington, Connecticut. This demonstration project continues to operate even though the research program is completed as it provides substantial benefits to the manufacturing facility by supplying power, heat, and hydrogen.

  14. Feasibility determination of low head hydroelectric power development at existing sites: Mousam River Project

    Energy Technology Data Exchange (ETDEWEB)

    1979-06-01

    The technical and economic feasibility of low head hydroelectric power development at existing sites along the Mousam River in southeastern Maine was studied. The following areas were investigated: determination of available energy; development of restoration concepts; environmental studies; historical and archeological studies; assessment of civil construction requirements; geotechnical and geologic assessment of existing dams; assessment of turbine alternatives; assessment of generator and utility interface alternatives; economic analysis; and restoration concept evaluation and selection. The results of the hydropower evaluation showed that: of the seven sites evaluated, only four can be considered economically feasible for refurbishment at this time; the use of used and/or rebuilt equipment is more economically attractive than new equipment; the cost of equipment at each site was of the same order as the cost of the dam reconstruction; and the cost of fuel prices will be the determining feature of whether the sites should be reconstructed.

  15. Geological, geophysical investigations and seismotectonic analysis with reference to selection of site for nuclear power plants: a review

    International Nuclear Information System (INIS)

    Chaki, Anjan

    2014-01-01

    Geological, geophysical investigations and seismotectonic analysis play a major role in qualifying a proposed site for establishment of nuclear power plants. In an area, it is important to understand the aspects such as regional and local geology, geomorphology, tectonic settings, presence of active faults/capable faults, earthquake history and earthquake proneness, neotectonic activity, slope instability, subsidence, liquefaction, seismically induced flooding, tsunami and geohydrological conditions. Geological investigations comprise use of remote sensing and ground validation followed by geological mapping, identification of faults, near surface geological studies for foundation conditions, stratigraphic drilling, palaeoseismology, studies on engineering properties of rock and soil. Geophysical investigations provide insight into subsurface geology including concealed faults, elastic constants and hydrological conditions. Radon emanometry is a valuable tool in the initial stage to decipher subsurface active weak zones/fault lines. Seismotectonic analysis identifies the provinces of tectonic significance and their earthquake potential, thereby designating lineaments of consequence leading to their evaluation. This, in turn, determines the design basis earthquake parameter for the estimation of vibratory ground motion. This article provides certain measures to evaluate the suitability of the sites for the establishment of nuclear power plants in terms of geological, geophysical investigations and seismotectonic status. Atomic Minerals Directorate for Exploration and Research (AMD) had carried out seismotectonic analysis of the area around Kaiga, Narora, Kalpakkam, Kakrapar, Tarapur, Kudankulam and Rawatbhata Nuclear Power Projects, which were either in operation or under expansion and construction. Such analysis was extended to a number of proposed sites for establishing nuclear power plants in West Bengal, Bihar, Orissa, Andhra Pradesh, Gujrat, Madhya Pradesh

  16. Feasibility Study of Economics and Performance of Solar Photovoltaics at the Price Landfill Site in Pleasantville, New Jersey. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    Energy Technology Data Exchange (ETDEWEB)

    Salasovich, J.; Geiger, J.; Mosey, G.; Healey, V.

    2013-05-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Price Landfill site in Pleasantville, New Jersey, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site. This study did not assess environmental conditions at the site.

  17. Feasibility Study of Economics and Performance of Solar Photovoltaics at the Tower Road Site in Aurora, Colorado. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    Energy Technology Data Exchange (ETDEWEB)

    Van Geet, O.; Mosey, G.

    2013-03-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Tower Road site in Aurora, Colorado, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site. This study did not assess environmental conditions at the site.

  18. Effects of Californian PRC 25500 on nuclear power plant licensing

    International Nuclear Information System (INIS)

    Hahn, F.J.

    1976-01-01

    The California Public Resources Code 25500 established the Energy Resources Conservation and Development Commission on January 7, 1976. This Act mandated that the Commission process applications for new power plants within very specific timeframes. The paper presents the intent and timing of the two-phase licensing procedure and illustrates the effect of this procedure on power plants already into the NRC licensing process and on power plants which are in the beginning of the site selection process

  19. Population dose commitments due to radioactive releases from nuclear power plant sites in 1980

    International Nuclear Information System (INIS)

    Baker, D.A.; Peloquin, R.A.

    1983-08-01

    Population radiation dose commitments have been estimated from reported radionuclide releases from commercial power reactors operating during 1980. In addition doses derived from the shutdown reactors at the Three Mile Island site were included. Fifty-year dose commitments from a one-year exposure were calculated from both liquid and atmospheric releases for four population groups (infant, child, teen-ager and adult) residing between 2 and 80 km from each site. This report tabulates the results of these calculations, showing the dose commitments for both liquid and airborne pathways for each age group and organ. Also included for each site is a histogram showing the fraction of the total population within 2 to 80 km around each site receiving various average dose commitments from the airborne pathways. The total dose commitment from both liquid and airborne pathways ranged from a high of 40 person-rem to a low of 0.02 person-rem with an arithmetic mean of 4 person-rem. The total population dose for all sites was estimated at 180 person-rem for the 96 million people considered at risk

  20. Rocketdyne Propulsion and Power DOE operations annual site environmental report 1996

    International Nuclear Information System (INIS)

    Tuttle, R.J.

    1997-01-01

    Rocketdyne currently operates several facilities in the San Fernando Valley/Simi Valley area, for manufacturing, testing, and research and development (R and D). These operations include manufacturing liquid-fueled rocket engines, such as the Space Shuttle Main Engine (SSME) and engines used for expendable launch vehicles used to place artificial satellites into orbit. This work includes fabrication and testing of rocket engines, lasers, and heat-transfer systems; and R and D in a wide range of high-technology fields, such as the electrical power system for the Space Station. Previously, this work also included development, fabrication, and disassembly of nuclear reactors, reactor fuel, and other radioactive materials, under the Atomics International Division (AI). AI was merged into Rocketdyne in 1984 and many of the AI functions were transferred to existing Rocketdyne departments. This nuclear work was terminated in 1988, and subsequently, all radiological work has been directed toward decontamination and decommissioning (D and D) of the previously used nuclear facilities and associated site areas. The majority of this work is done for the Department of Energy (DOE). This Annual Site Environmental Report for 1996 concentrates on the environmental conditions related to DOE operations at Area IV of SSFL and at De Soto

  1. Improving regulatory effectiveness in federal/state siting actions: state regulatory activity involved in need for power

    International Nuclear Information System (INIS)

    Nassikas, J.

    1977-04-01

    The individual views are presented of the panel members relating to the basic issues and framework for improvements of the Federal/state process for licensing of nuclear power plants, associated facilities, transmission lines, reprocessing of fuel and uranium enrichment. The synopsis supplements the initial synopsis of the views presented to the National Governors Conference Workshop ''State Perspectives on Energy Facility Siting'' in Atlanta, Georgia on December 15--16, 1976. Both synopses constitute the report of this panel

  2. A Tracer Experiment to Understand Dispersion Characteristics at a Nuclear Power Plant Site-Focusing on the Comparison with Predictive Results using Reg. Guide 1.145 model

    Energy Technology Data Exchange (ETDEWEB)

    Jeong, Hyojoon; Kim, Eunhan; Jeong, Haesun; Hwang, Wontae; Han, Moonhee [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2014-10-15

    There remains disagreement regarding the application of a Gaussian plume model in PAVAN, as it relates to the complicated geographical features of a coastal area. Therefore, this study was performed in order to figure out the characteristics of the PAVAN program that was developed based on the equations of Gaussian Plume Model, which reflected the actual measured concentration of radioactive materials released to the air. It also evaluated the appropriateness of using a Gaussian plume model for assessing the environmental impact of radiation from a nuclear power plant. In order to analyze the dispersion characteristics of radioactive materials released into the air from the Wolsong nuclear power plant, SF{sub 6} gas was released from the site at night for one hour under stable atmospheric conditions disadvantageous to dilute a tracer gas in this study. The measured concentrations were compared with theoretical estimates derived from meteorological data observed during the experiment period to evaluate the prediction capabilities of the Gaussian plume model. This study conducted a tracer dispersion experiment at the site of Wolsong Nuclear Power Plant site in Korea to analyze the atmospheric dispersion characteristics of radioactive materials. It compared the experimental value with the calculated value using the Gaussian Plume Model as suggested in Reg. 1.145, based on the meteorological data observed in the experiment time period, and evaluated the conservative estimate of the calculated value. In the area where the calculated value is relatively high, the calculated value tends to show higher than the experimental value, which confirmed the conservative manner of the estimating of the calculated value using the Gaussian Plume Model. The short-term exposure of radiation to a human body caused by a nuclear accident would be higher in the area where the atmospheric concentration of radiation is high. Therefore, it is a sufficiently conservative manner to use the

  3. A Tracer Experiment to Understand Dispersion Characteristics at a Nuclear Power Plant Site-Focusing on the Comparison with Predictive Results using Reg. Guide 1.145 model

    International Nuclear Information System (INIS)

    Jeong, Hyojoon; Kim, Eunhan; Jeong, Haesun; Hwang, Wontae; Han, Moonhee

    2014-01-01

    There remains disagreement regarding the application of a Gaussian plume model in PAVAN, as it relates to the complicated geographical features of a coastal area. Therefore, this study was performed in order to figure out the characteristics of the PAVAN program that was developed based on the equations of Gaussian Plume Model, which reflected the actual measured concentration of radioactive materials released to the air. It also evaluated the appropriateness of using a Gaussian plume model for assessing the environmental impact of radiation from a nuclear power plant. In order to analyze the dispersion characteristics of radioactive materials released into the air from the Wolsong nuclear power plant, SF 6 gas was released from the site at night for one hour under stable atmospheric conditions disadvantageous to dilute a tracer gas in this study. The measured concentrations were compared with theoretical estimates derived from meteorological data observed during the experiment period to evaluate the prediction capabilities of the Gaussian plume model. This study conducted a tracer dispersion experiment at the site of Wolsong Nuclear Power Plant site in Korea to analyze the atmospheric dispersion characteristics of radioactive materials. It compared the experimental value with the calculated value using the Gaussian Plume Model as suggested in Reg. 1.145, based on the meteorological data observed in the experiment time period, and evaluated the conservative estimate of the calculated value. In the area where the calculated value is relatively high, the calculated value tends to show higher than the experimental value, which confirmed the conservative manner of the estimating of the calculated value using the Gaussian Plume Model. The short-term exposure of radiation to a human body caused by a nuclear accident would be higher in the area where the atmospheric concentration of radiation is high. Therefore, it is a sufficiently conservative manner to use the Gaussian

  4. Proceedings of the symposium on the on-site management of power reactor wastes

    International Nuclear Information System (INIS)

    Anon.

    1979-01-01

    This symposium represents a synthesis of some current practices and research and development work in the field of radioactive waste management at nuclear power plants. It includes the following sessions: radioactive waste management practices at nuclear power plants; waste production and operating experiences; coolant and liquid waste processing; solidification methods; volume reduction methods; solid waste containment

  5. Fuel cells. Pt. 1; Celle a combustibile. Pt. 1

    Energy Technology Data Exchange (ETDEWEB)

    Campanari, S; Macchi, E [Milan Politecnico (Italy). Dip. di Energetica

    1999-01-01

    Direct conversion of chemical energy into electricity (without intermediate heat generation) is a long-established method to improve the efficiency of power generation, as well as to reduce polluting emissions from thermal plants. The origins of fuel cells, as well as their operating principles, are dealt with. Then, various types of cells are taken into consideration, on the basis of both their characteristics and the operating principles of electrolytes. Finally, structure and operation of Polymer Electrolyte Membrane Fuel Cells (PEMFC), Alkaline Fuel Cells (AFC) and Phosphoric Acid Fuel Cells (PAFC) are described. [Italiano] La conversione diretta dell`energia chimica del combustibile in energia elettrica, senza passare attraverso la produzione di calore, rappresenta una via ormai ampiamente collaudata per migliorare l`efficienza della produzione di energia elettrica e per contenere le emissioni generate dagli impianti termoelettrici. L`articolo, dopo una breve presentazione della storia dello sviluppo nel tempo delle celle a combustibile, espone i principi di funzionamento delle stesse. Si esaminano quindi i vari tipi di cella a partire dalle caratteristiche e dalle modalita` di funzionamento degli elettroliti che ne definiscono la classificazione. Successivamente vengono illustrate le caratteristiche costruttive e funzionali delle celle ad elettrolita polimerico (PEMFC), delle celle alcaline (AFC) e delle celle ad acido fosforico (PAFC).

  6. Feasibility Study of Economics and Performance of Solar Photovoltaics at the Kerr McGee Site in Columbus, Mississippi. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    Energy Technology Data Exchange (ETDEWEB)

    Simon, J.; Mosey, G.

    2013-01-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Kerr McGee site in Columbus, Mississippi, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.

  7. Feasibility Study of Economics and Performance of Solar Photovoltaics at the Crazy Horse Landfill Site in Salinas, California. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    Energy Technology Data Exchange (ETDEWEB)

    Stoltenberg, B.; Konz, C.; Mosey, G.

    2013-03-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Crazy Horse Landfill site in Salinas, California, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) was contacted to provide technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, operation and maintenance requirements, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.

  8. Nuclear Energy Center Site Survey, 1975. Executive summary

    International Nuclear Information System (INIS)

    1976-01-01

    The Nuclear Energy Center Site Survey is a study of a potential alternative siting approach for nuclear power and fuel-cycle facilities, an approach that would cluster sizable groups of such facilities on a relatively small number of sites. The largest aggregation of reactors on a single site being planned today is four, and this quad is assumed (for comparative study purposes) to be the typical dispersed site by the year 2000. Three basic types of nuclear energy centers are considered: power-plant centers, consisting of 10 to 40 nuclear electric generating units of 1200-megawatt electric capacity each; fuel-cycle centers, consisting of fuel reprocessing plants, mixed-oxide fuel fabrication facilities, and radioactive waste management facilities; and combined centers, containing both power plants and fuel-cycle facilities. The results of the general site-location screening efforts are shown on a United States map that shows the locations of large areas identified as likely to contain suitable candidate sites for power NECs, on the basis of four coarse screening criteria: water resources, seismic activity, population density, and statutory excluded lands

  9. Tornado damage at the Grand Gulf, Mississippi nuclear power plant site: aerial and ground surveys

    International Nuclear Information System (INIS)

    Fujita, T.T.; McDonald, J.R.

    1978-05-01

    A tornado struck the Grand Gulf nuclear power generating station, Port Gibson, Mississippi, about 11:30 p.m. on April 17, 1978. Storm damage investigators from the University of Chicago and Texas Tech University were dispatched to survey the damage. The meteorological situation that spawned the Grand Gulf tornado and seven others in the area is discussed. Aerial surveys of the entire damage path and detailed surveys of the plant site are presented. An engineering evaluation of the damage is also presented based primarily on information gained from detailed ground surveys

  10. Technological and economic preconditions for the construction of wind power stations on inland sites

    International Nuclear Information System (INIS)

    Stapperfenne, W.

    1992-01-01

    In principle, wind power is perceived as a manageable and soft-type energy; nevertheless operators are advised against trying to design and build wind power plants based on their very own ideas since these will often be found to fall short of the stringent requirements of regulatory authorities for safety, wind technology and statics, and of the demand of knowledge in mechanical engineering, electronics and computer technology. In addition, the utilization of wind power is ruled by tax laws since a certain are of the power produced will have to be fed to the national grid which means that the plant operator is a producer subjected to value-added taxation with the right of reimbussement of prepaid taxes [de

  11. An approach to siting nuclear power plants: the relevance of earthquakes, faults and decision analysis

    International Nuclear Information System (INIS)

    Nair, K.; Brogan, G.E.; Cluff, L.S.; Idriss, I.M.; Mao, K.T.

    1975-01-01

    The regional approach to nuclear power plant siting described in this paper identifies candidate sites within the region and ranks these sites by using decision-analysis concepts. The approach uses exclusionary criteria to eliminate areas from consideration and to identify those areas which are most likely to contain candidate sites. These areas are then examined in greater detail to identify candidate sites, and the number of sites under consideration is reduced to a reasonably manageable number, approximately 15. These sites are then ranked using concepts of decision analysis. The exclusionary criteria applied relate primarily to regulatory-agency safety requirements and essential functional requirements. Examples of such criteria include proximity to population centres, presence of active faults, and the availability of cooling water. In many areas of the world, the presence of active faults and potential negative effects of earthquakes are dominant exclusionary criteria. To apply the 'active fault' criterion the region must be studied to locate and assess the activity of all potentially active faults. This requires complementary geologic (including geomorphic), historical, seismological, geodetic and geophysical investigations of the entire region. Site response studies or empirical attenuation correlations can be used to determine the relevant parameters of anticipated shaking from postulated earthquakes, and analytical testing and evaluation can be used to assess the potential extent of ground failure during an earthquake. After candidate sites are identified, an approach based on decision analysis is used to rank them. This approach uses the preferences and judgements of consumers, utility companies, the government, and other groups concerned with siting and licensing issues in the ranking process. Both subjective and objective factors are processed in a logical manner, as are the monetary and non-monetary factors and achievement of competing environmental

  12. Development of emergency response training program for on-site commanders (1)

    International Nuclear Information System (INIS)

    Hikono, Masaru; Matsui, Yuko; Kanayama, Masaki

    2017-01-01

    Since the Great East Japan Earthquake of 2011, there have been increasing calls for developing the leadership capabilities of managers who are in charge of command and control of the on-site emergency response center at nuclear power plants. Training programs to improve non-technical skills are being developed and introduced. The authors developed an active learning exercise that can be repeatedly performed on-site, targeting on-site commander teams in charge of the initial response in an emergency situation. The exercise forms the core element of a non-technical skills training curriculum. This paper outlines the developed exercise, evaluates the stress on the participants caused by the exercise, and identifies any issues before actually introducing it to a site. (author)

  13. Explanation of procedure on site medical emergency response for nuclear accident

    International Nuclear Information System (INIS)

    Liu Yulong; Jiang Zhong

    2012-01-01

    National occupational health standard-Procedure on Site Medical Emergency Response for Nuclear Accident has been approved and issued by the Ministry of Health. This standard is formulated according to the Emergency Response Law of the People's Republic of China, Law of the People 's Republic of China on Prevention and Control of Occupational Diseases, Regulations on Emergency Measures for Nuclear Accidents at Nuclear Power Plants, and Health Emergency Plans for Nuclear and Radiological Accidents of Ministry of Health, supporting the use of On-site Medical Emergency Planning and Preparedness for Nuclear Accidents and Off-site Medical Emergency Planning and Preparedness for Nuclear Accidents. Nuclear accident on-site medical response procedure is a part of the on-site emergency plan. The standard specifies the basic content and requirements of the nuclear accident on-site medical emergency response procedures of nuclear facilities operating units to guide and regulate the work of nuclear accident on-site medical emergency response of nuclear facilities operating units. The criteria-related contents were interpreted in this article. (authors)

  14. Assessment of the Impacts of Green Mountain Power Corporation's Wind Power Facility on Breeding and Migrating Birds in Searsburg, Vermont: July 1996--July 1998

    Energy Technology Data Exchange (ETDEWEB)

    Kerlinger, P.

    2002-03-01

    A 6-megawatt, 11 turbine wind power development was constructed by Green Mountain Power Corporation in Searsburg, southern Vermont, in 1996. To determine whether birds were impacted, a series of modified BA (Before, After) studies was conducted before construction (1993-1996), during (1996), and after (1997) construction on the project site. The studies were designed to monitor changes in breeding bird community (species composition and abundance) on the site, examine the behavior and numbers of songbirds migrating at night over the site and hawks migrating over the site in daylight, and search for carcasses of birds that might have collided with the turbines.

  15. Feasibility Study of Anaerobic Digestion of Food Waste in St. Bernard, Louisiana. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    Energy Technology Data Exchange (ETDEWEB)

    Moriarty, K.

    2013-01-01

    The U.S. Environmental Protection Agency (EPA) developed the RE-Powering America's Land initiative to re-use contaminated sites for renewable energy generation when aligned with the community's vision for the site. The former Kaiser Aluminum Landfill in St. Bernard Parish, Louisiana, was selected for a feasibility study under the program. Preliminary work focused on selecting a biomass feedstock. Discussions with area experts, universities, and the project team identified food wastes as the feedstock and anaerobic digestion (AD) as the technology.

  16. Seismic Vulnerability Assessment of Site-Vicinity Infrastructure for Supporting the Accident Management of a Nuclear Power Plant

    Directory of Open Access Journals (Sweden)

    T. J. Katona

    2017-01-01

    Full Text Available Nuclear power plants shall be designed to resist the effects of large earthquakes. The design basis earthquake affects large area around the plant site and can cause serious consequences that will affect the logistical support of the emergency actions at the plant, influence the psychological condition of the plant personnel, and determine the workload of the country’s disaster management personnel. In this paper the main qualitative findings of a study are presented that have been performed for the case of a hypothetical 10−4/a probability design basis earthquake for the Paks Nuclear Power Plant, Hungary. The study covers the qualitative assessment of the postearthquake conditions at the settlements around the plant site including quantitative evaluation of the condition of dwellings. The main goal of the recent phase of the study was to identify public utility vulnerabilities that define the outside support conditions of the nuclear power plant accident management. The results of the study can be used for the planning of logistical support of the plant accident management staff. The study also contributes to better understanding of the working conditions of the disaster management services in the region around the nuclear power plant.

  17. Population dose commitments due to radioactive releases from nuclear power plant sites in 1975

    International Nuclear Information System (INIS)

    Baker, D.A.; Soldat, J.K.; Watson, E.C.

    1977-10-01

    Population radiation dose commitments were estimated from reported radionuclide releases from commercial power reactors operating during 1975. Fifty-year dose commitments from one year exposure were calculated from both liquid and atmospheric releases for four population groups (infant, child, teenager and adult) residing between 2 and 80 km from each site. Results are given in the form of tables giving the dose commitments for both liquid and airborne pathways for each age group and organ. Also included for each site is a histogram showing the fraction of the total population within the 2 to 80-km region around each site receiving various average dose commitments from the airborne pathways. The total dose commitment from both liquid and airborne pathways ranged from a high of 750 person-rem to a low of 0.008 person-rem with an arithmetic mean of 34 person-rem

  18. Remote-site power generation opportunities for Alaska

    Energy Technology Data Exchange (ETDEWEB)

    Jones, M.L.

    1997-03-01

    The Energy and Environmental Research Center (EERC) has been working with the Federal Energy Technology Center in Morgantown, West Virginia, to assess options for small, low-cost, environmental acceptable power generation for application in remote areas of Alaska. The goal of this activity was to reduce the use of fuel in Alaskan villages by developing small, low-cost power generation applications. Because of the abundance of high-quality coal throughout Alaska, emphasis was placed on clean coal applications, but other energy sources, including geothermal, wind, hydro, and coalbed methane, were also considered. The use of indigenous energy sources would provide cheaper cleaner power, reduce the need for PCE (Power Cost Equalization program) subsidies, increase self-sufficiency, and retain hard currency in the state while at the same time creating jobs in the region. The introduction of economical, small power generation systems into Alaska by US equipment suppliers and technology developers aided by the EERC would create the opportunities for these companies to learn how to engineer, package, transport, finance, and operate small systems in remote locations. All of this experience would put the US developers and equipment supply companies in an excellent position to export similar types of small power systems to rural areas or developing countries. Thus activities in this task that relate to determining the generic suitability of these technologies for other countries can increase US competitiveness and help US companies sell these technologies in foreign countries, increasing the number of US jobs. The bulk of this report is contained in the two appendices: Small alternative power workshop, topical report and Global market assessment of coalbed methane, fluidized-bed combustion, and coal-fired diesel technologies in remote applications.

  19. Geographical distributions of biomass and potential sites of rubber wood fired power plants in Southern Thailand

    International Nuclear Information System (INIS)

    Krukanont, P.; Prasertsan, S.

    2004-01-01

    Biomass residues from rubber trees in rubber producing countries have immense potential for power production. This paper presents the case of the south peninsular of Thailand, where the rubber industry is intense. Mathematical models were developed to determine the maximum affordable fuel cost and optimum capacity of the power plant for a given location of known area-based fuel availability density. GIS data of rubber growing was used to locate the appropriate sites and sizes of the power plants. Along 700 km of the highway network in the region, it was found that 8 power plants are financially feasible. The total capacity is 186.5 MW e . The fuel procurement area is in the range of less than 35 km. (Author)

  20. Population dose commitments due to radioactive releases from nuclear power plant sites in 1986

    International Nuclear Information System (INIS)

    Baker, D.A.

    1989-10-01

    Population radiation dose commitments have been estimated from reported radionuclide releases from commercial power reactors operating during 1986. Fifty-year dose commitments for a one-year exposure from both liquid and atmospheric releases were calculated for four population groups (infant, child, teen-ager and adult) residing between 2 and 80 km from each of 66 reactor sites. This report tabulates the results of these calculations, showing the dose commitments for both water and airborne pathways for each age group and organ. Also included for each of the sites is a histogram showing the fraction of the total population within 2 to 80 km around each site receiving various average dose commitments from the airborne pathways. The total dose commitments (from both liquid and airborne pathways) for each site ranged from a high of 31 person-rem to a low of 0.0007 person-rem for the sites with plants operating throughout the year with an arithmetic mean of 1.7 person-rem. The total population dose for all sites was estimated at 110 person-rem for the 140 million people considered at risk. The site average individual dose commitment from all pathways ranged from a low of 2 x 10 -6 mrem to a high of 0.02 mrem. No attempt was made in this study to determine the maximum dose commitment received by any one individual from the radionuclides released at any of the sites. 12 refs

  1. Population dose commitments due to radioactive releases from nuclear power plant sites in 1984

    International Nuclear Information System (INIS)

    Baker, D.A.

    1988-01-01

    Population radiation dose commitments have been estimated from reported radionuclide releases from commercial power reactors operating during 1984. Fifty-year dose commitments from a one-year exposure were calculated from both liquid and atmospheric releases for four population groups (infant, child, teen-ager and adult) residing between 2 and 80 km from each of 56 sites. This report tabulates the results of these calculations, showing the dose commitments for both liquid and airborne pathways for each age group and organ. Also included for each of the sites is a histogram showing the fraction of the total population within 2 to 80 km around each site receiving various average dose commitments from the airborne pathways. The total dose commitments (from both liquid and airborne pathways) for each site ranged from a high of 110 person-rem to a low of 0.002 person-rem for the sites with plants operating throughout the year with an arithmetic mean of 5 person-rem. The total population dose for all sites was estimated at 280 person-rem for the 100 million people considered at risk. The site average individual dose commitment from all pathways ranged from a low of 6 x 10 -6 mrem to a high of 0.04 mrem. No attempt was made in this study to determine the maximum dose commitment received by any one individual from the radionuclides released at any of the sites

  2. Population dose commitments due to radioactive releases from nuclear power plant sites in 1985

    International Nuclear Information System (INIS)

    Baker, D.A.

    1988-08-01

    Population radiation dose commitments have been estimated from reported radionuclide releases from commericial power reactors operating during 1985. Fifty-year dose commitments from a one-year exposure were calculated from both liquid and atmospheric releases for four population groups (infant, child, teen-ager and adult) residing between 2 and 80 km from each of 61 sites. This report tabulates the results of these calculations, showing the dose commitments for both liquid and airborne pathways for each age group and organ. Also included for each of the sites is a histogram showing the fraction of the total population within 2 to 80 km around each site receiving various average dose commitments from the airborne pathways. The total dose commitments (from both liquid and airborne pathways) for each site ranged from a high of 73 person-rem to a low of 0.011 person-rem for the sites with plants operating throughout the year with an arithmetic mean of 3 person-rem. The total population dose for all sites was estimated at 200 person-rem for the 110 million people considered at risk. The site average individual dose commitment from all pathways ranged from a low of 5 /times/ 10/sup /minus/6/ mrem to a high of 0.02 mrem. No attempt was made in this study to determine the maximum dose commitment received by any one individual from the radionuclides released at any of the sites

  3. Whose University Is It, Anyway? Power and Privilege on Gendered Terrain

    Directory of Open Access Journals (Sweden)

    May Al Fartousi

    2013-07-01

    Full Text Available As a visible minority educator, I am always interested in analyzing the personal tensions, environmental barriers, and imaginative possibilities that exist when embracing equity- and diversity-conscious approaches to teaching, learning, and interacting in higher education institutions. In Whose University Is It, Anyway? Power and Privilege on Gendered Terrain, these areas of tension are treated as creative spaces to draw from the work of feminists who use this site as a site for power and new knowledge production.

  4. Nuclear power in rock. Principal report

    International Nuclear Information System (INIS)

    1977-06-01

    In September 1975 the Swedish Government directed the Swedish State Power Board to study the question of rock-siting nuclear power plants. The study accounted for in this report aims at clarifying the advantages and disadvantages of siting a nuclear power plant in rock, compared to siting on ground level, considering reactor safety, war protection and sabotage. The need for nuclear power production during war situations and the closing down of nuclear power plants after terminated operation are also dealt with. (author)

  5. Selected environmental considerations and their measuring parameters for nuclear power plant siting

    International Nuclear Information System (INIS)

    Norris, J.A.

    1975-01-01

    The site selection process for nuclear power stations encompasses a broad range of considerations. A categorization of these considerations consistent with the needs of the U. S. Atomic Energy Commission, as the regulatory agency, and of the utility company involves these major areas of concern. They are issues related to safety, environmental impact, and engineering/economics. The more important environmental considerations and their measuring parameters presented in this paper include biota, ecological systems and water quality, land use, aesthetics, water availability, and meteorology. (U.S.)

  6. Soil remediation of a former power plant site in Tulita, Northwest Territories

    International Nuclear Information System (INIS)

    Pouliot, Y.; Thomassin-Lacroix, E.; Moreau, N.

    2005-01-01

    This paper outlines major stages of an ongoing remediation project caused by a power generating plant in the Dene Hamlet of Tulita. High levels of soil contamination were caused by the plant's operations as well as accidental petroleum hydrocarbon (PHC) spills. The decommissioning of the plant required that the site be remediated. Challenges faced by the remediators included the high level of contamination, the remote location of the community, as well as the fact that the site was located in the centre of the community. In addition, the soil in the impacted site was fine, and a 20 cm thick layer of peat acted as sponge, absorbing and trapping hydrocarbons. Remedial criteria was outlined according to Canada-Wide Standards for fine-grained soil in an industrial setting. The technology used for the project was Biopile, a process consisting of installing wells in the contaminated zone in order to provide the aeration required for PHC biodegradation and to condition the soil on a regular basis in order to promote optimal treatment conditions throughout the impacted material. Results indicated that the first 2 months were successful in reducing initial PHC levels. However, the following treatment season did not show as much degradation. An investigation revealed that nitrogen and phosphorus levels were insufficient to sustain microbial activity, as a result of lower than normal temperatures in the area for that season. Nutrients were added to the soil to re-establish the appropriate treatment conditions. It was concluded that the technology used presented numerous advantages. Overall disturbance of the area was reduced, and allowed other measures to be implemented, including segregation of the highly impacted peat layer. It was expected that remediation objectives for the entire site will be met by July 2005. 3 refs., 3 tabs

  7. Soil remediation of a former power plant site in Tulita, Northwest Territories

    Energy Technology Data Exchange (ETDEWEB)

    Pouliot, Y.; Thomassin-Lacroix, E. [Biogenie Inc., Lachenaie, PQ (Canada); Moreau, N. [Biogenie, Quebec City, PQ (Canada)

    2005-07-01

    This paper outlines major stages of an ongoing remediation project caused by a power generating plant in the Dene Hamlet of Tulita. High levels of soil contamination were caused by the plant's operations as well as accidental petroleum hydrocarbon (PHC) spills. The decommissioning of the plant required that the site be remediated. Challenges faced by the remediators included the high level of contamination, the remote location of the community, as well as the fact that the site was located in the centre of the community. In addition, the soil in the impacted site was fine, and a 20 cm thick layer of peat acted as sponge, absorbing and trapping hydrocarbons. Remedial criteria was outlined according to Canada-Wide Standards for fine-grained soil in an industrial setting. The technology used for the project was Biopile, a process consisting of installing wells in the contaminated zone in order to provide the aeration required for PHC biodegradation and to condition the soil on a regular basis in order to promote optimal treatment conditions throughout the impacted material. Results indicated that the first 2 months were successful in reducing initial PHC levels. However, the following treatment season did not show as much degradation. An investigation revealed that nitrogen and phosphorus levels were insufficient to sustain microbial activity, as a result of lower than normal temperatures in the area for that season. Nutrients were added to the soil to re-establish the appropriate treatment conditions. It was concluded that the technology used presented numerous advantages. Overall disturbance of the area was reduced, and allowed other measures to be implemented, including segregation of the highly impacted peat layer. It was expected that remediation objectives for the entire site will be met by July 2005. 3 refs., 3 tabs.

  8. Impact of Site Elevation on Mg Smelter Design

    Science.gov (United States)

    Baker, Phillip W.

    Site elevation has many surprising and significant impacts on the engineering design of metallurgical plant of all types. Electrolytic magnesium smelters maybe built at high elevation for a variety of reasons including availability of raw material, energy or electric power. Because of the unit processes they typically involve, Mg smelters can be extensively impacted by site elevation. In this paper, generic examples of the design changes required to adapt a smelter originally designed for sea level to operate at 2700 m are presented. While the examples are drawn from a magnesium plant design case, these changes are generically applicable to all industrial plants utilizing similar unit processes irrespective of product.

  9. Population dose commitments due to radioactive releases from nuclear power plant sites in 1982. Volume 4

    International Nuclear Information System (INIS)

    Baker, D.A.; Peloquin, R.A.

    1986-06-01

    Population radiation dose commitments have been estimated from reported radionuclide releases from commercial power reactors operating during 1982. Fifty-year dose commitments from a one-year exposure were calculated from both liquid and atmospheric releases for four population groups (infant, child, teen-ager and adult) residing between 2 and 80 km from each of 51 sites. This report tabulates the results of these calculations, showing the dose commitments for both liquid and airborne pathways for each age group and organ. Also included for each site is a histogram showing the fraction of the total population within 2 to 80 km around each site receiving various average dose commitments from the airborne pathways. The total dose commitments from both liquid and airborne pathways ranged from a high of 30 person-rem to a low of 0.007 person-rem for the sites with plants operating throughout the year with an arithmetic mean of 3 person-rem. The total population dose for all sites was estimated at 130 person-rem for the 100 million people considered at risk. The average individual dose commitment from all pathways on a site basis ranged from a low of 6 x 10 -7 mrem to a high of 0.06 mrem. No attempt was made in this study to determine the maximum dose commitment received by any one individual from the radionuclides released at any of the sites

  10. Attitudes of the general public and electric power company employees toward nuclear power generation

    International Nuclear Information System (INIS)

    Komiyama, Hisashi

    1997-01-01

    We conducted an awareness survey targeted at members of the general public residing in urban areas and in areas scheduled for construction of nuclear power plants as well as employees of electric power company in order to determine the awareness and attitude structures of people residing near scheduled construction sites of nuclear power plants with respect to nuclear power generation, and to examine ways of making improvements in terms of promoting nuclear power plant construction sites. Analysis of those results revealed that there are no significant differences in the awareness and attitudes of people residing in urban areas and in areas near scheduled construction sites. On the contrary, a general sense of apprehension regarding the construction of nuclear power plants was observed common to both groups. In addition, significant differences in awareness and attitudes with respect to various factors were determined to exist between members of the general public residing in urban areas and scheduled construction sites and employees of electric power company. (author)

  11. Thematic outlook: the technical survey for the fuel cell research network PACO. September 29, 2004 update no. 27; Veille thematique. La veille technique pour le reseau PACO. Actualisation du 29 septembre 2004, no. 27

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-07-01

    Summaries of several recent articles are gathered here. They deal with fuel cells, means of transport, hydrogen production and storage. Their different titles are given below: 1)the Germany countries agreement for fuel cells 2)electrochemical modelling of an IP-SOFC 3)design and performances of PEMFC tested with negative temperatures 4)carbon-air fuel cells without reforming process 5)exergy and economical analysis of a PAFC system of 200 kW 6)experience feedback on the use of a PAFC 7)experience feedback on the use of a PEMFC of 250 kW 8)hybrid fuel cell-powered vehicle: a possible solution of motorization 9)recent advancements in direct ethanol fuel cells: development of new platinum-tin electrocatalysts 10)review of components for SOFC anode 11)development of a fuel cell bicycle 12)steam reforming and water gas conversion by vapor permeation in a PCFC 13)modelling of an auto-thermal catalytic reformer for fuel cells applications 14)CO removal: system integrated to a preferential oxidation reactor for PEMFC vehicles 15)helio-hydraulic and helio-thermal hydrogen production 16)recent advances in the field of hydrogen storage in inorganic nano-structures containing metals 17)sequestration and storage of CO{sub 2}, the essential link for an hydrogen economy. The references of these articles are detailed. (O.M.)

  12. DBE on site public relations tasks

    International Nuclear Information System (INIS)

    Krug, H.J.; Meyer, R.

    1998-01-01

    Full text: Thesis: There is no 'golden rule' for an immediate increase in acceptance of nuclear facility sites - this applies to nuclear power plants as well as waste management facilities. The German Company for the Construction and Operation of Repositories for Waste Products (DBE - entrusted on behalf of the Federal Government with the management of all three German waste repository sites (projects), Morsleben, Konrad, Gorleben - concentrates in the field of public relations work on the following: - caring for (and informing) visitors from home and abroad; - cooperation with local and regional authorities and their representatives, press, media, etc. including associate editing of the GORLEBEN-information leaflet which appears monthly or every second month in cooperation with the Federal Board for Radiation Protection (BfS), as well as press releases if required; - responding to inquiries and visit requests of press, radio and TV. Basic work: - early and comprehensive information of the public at the sites about progress of work and possible exceptional events with special involvement of local politicians and representatives as well as press agencies. Close contacts exist to the local paper and to a national paper; - municipal representatives and the media are regularly directly informed on site or sporadically at their own request; - special emphasis is placed on the spoken, explaining word, namely that communication and discussion are valued more highly than written material. Of course, transparencies, films and brochures are available to support the spoken word; - continual availability for discussion and information presentations e.g., also at weekends; - maintenance of casual contacts to opponents of the plant. In Gorleben - the site of further waste management facilities beside the exploration mine - there is close cooperation with representatives of the other important companies and institutions hence, visitors are generally pooled, i.e., the majority

  13. Accident for natural gas well with hydrogen sulfide in relation to nuclear power plant siting

    International Nuclear Information System (INIS)

    Tan Chengjun; Shangguang Zhihong; Sha Xiangdong

    2010-01-01

    In order to make assessment to the potential impact from accident of natural gas wells with hydrogen sulfide on the habitability of main control room of nuclear power plant (NPP), several assumptions such as source terms of maximum credible accident, conservative atmospheric conditions and release characteristics were proposed in the paper, and the impact on the habitability of main control room was evaluated using toxicity thresholds recommended by foreign authority. Case results indicate that the method can provide the reference for the preliminary assessment to external human-induced events during the siting phrase of NPP. (authors)

  14. Feasibility Study of Economics and Performance of Solar Photovoltaics at the Sky Park Landfill Site in Eau Claire, Wisconsin. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    Energy Technology Data Exchange (ETDEWEB)

    Simon, J.; Mosey, G.

    2013-01-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Sky Park Landfill site in Eau Claire, Wisconsin, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.

  15. Feasibility Study of Economics and Performance of Solar Photovoltaics at the Former Fort Ord Army Base Site in Marina, California. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    Energy Technology Data Exchange (ETDEWEB)

    Stoltenberg, B.; Konz, C.; Mosey, G.

    2013-05-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Former Fort Ord Army Base (FOAB) site in Marina, California, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.

  16. Changes of the soil environment affected by fly ash dumping site of the electric power plant

    Science.gov (United States)

    Weber, Jerzy; Gwizdz, Marta; Jamroz, Elzbieta; Debicka, Magdalena; Kocowicz, Andrzej

    2014-05-01

    In this study the effect of fly ash dumping site of the electric power plant on the surrounding soil environment was investigated. The fly ash dumping site collect wastes form brown coal combustion of Belchatow electric power station, central Poland. The dumping site is surrounding by forest, where pine trees overgrow Podzols derived from loose quartz sands. The soil profiles under study were located at a distance of 50, 100, 400 and 500 m from the dumping site, while control profiles were located 8 km away from the landfill. In all horizons of soil profiles the mpain hysico-chemical and chemical properties were determined. The humic substances were extracted from ectohumus horizons by Shnitzer's method, purified using XAD resin and freeze-dried. The fulvic acids were passed through a cation exchange column and freeze-dried. Optical density, elemental composition and atomic ratios were determined in the humic and fulvic acids. Organic carbon by KMnO4 oxidation was also determined in the organic soil horizons. The fly ash from the landfill characterized by high salinity and strong alkaline reaction (pH=10), which contributed significantly to the changes of the pH values in soils horizons. The alkalization of soils adjacent to the landfill was found, which manifested in increasing of pH values in the upper soil horizons. The impact of the landfill was also noted in the changes of the soil morphology of Podzols analysed. As a result of the alkalization, Bhs horizons have been converted into a Bs horizons. Leaching of low molecular humus fraction - typical for podzolization - has been minimized as a result of pH changes caused by the impact of the landfill, and originally occurring humic substances in the Bhs horizon (present in the control profiles) have been probably transported out of the soil profile and then into the groundwater.

  17. Status of small reactor designs without on-site refuelling

    International Nuclear Information System (INIS)

    2007-01-01

    There is an ongoing interest in member states in the development and application of small and medium sized reactors (SMRs). In the near term, most new NPPs are likely to be evolutionary designs building on proven systems while incorporating technological advances and often the economics of scale, resulting from the reactor outputs of up to 1600 MW(e). For the longer term, the focus is on innovative designs aiming to provide increased benefits in the areas of safety and security, non-proliferation, waste management, resource utilization and economy, as well as to offer a variety of energy products and flexibility in design, siting and fuel cycle options. Many innovative designs are reactors within the small-to-medium size range, having an equivalent electric power less than 700 MW(e) or even less than 300 MW(e). A distinct trend in design and technology development, accounting for about half of the SMR concepts developed worldwide, is represented by small reactors without on-site refuelling. Such reactors, also known as battery-type reactors, could operate without reloading and shuffling of fuel in the core over long periods, from 5 to 25 years and beyond. Upon the advice and with the support of IAEA member states, within its Programme 1 'Nuclear Power, Fuel Cycle, and Nuclear Science', the IAEA provides a forum for the exchange of information by experts and policy makers from industrialized and developing countries on the technical, economic, environmental, and social aspects of SMRs development and implementation in the 21st century, and makes this information available to all interested Member States by producing status reports and other publications dedicated to advances in SMR technology. The objective of this report is to provide Member States, including those just considering the initiation of nuclear power programmes and those already having practical experience in nuclear power, with a balanced and objective information on important development trends and

  18. Site of the First Spanish Nuclear Power Stations; Los Emplazamientos de las Primeras Centrales Nucleares Espanolas

    Energy Technology Data Exchange (ETDEWEB)

    Pascual, F.; Alonso, A.; Norena, S.; Sevilla, A. [Junta de Energia Nuclear, Madrid (Spain)

    1967-09-15

    The authors analyse and describe the sites of three Spanish nuclear power stations: the Zorita station (153 M W (e )) with a pressurized water reactor and single containment; the Santa Marfa de Garofia station (380 MW (e)), with a boiling water reactor and containment by steam condensation; and the Vandellos station (480 MW(e)), with a graphite-moderated gas-cooled reactor and integrated design of the EDF-4 type. The first two are located in the interior of the country and the third on the Mediterranean coast. The paper discusses the normal criteria and the safety considerations governing the choice of site, and points out the influence of Spanish orography on the transport of heavy equipment and hence its repercussions on the selection of power station sites. Reference is made to the experience acquired in transporting equipment for the Z-orita plant, and an analysis of the practical difficulties encountered in applying particular safety standards to the sites of stations of different types and designs is included. As the type of reactor and its containment system affect the practical value of applying particular standards which, moreover, have to be adapted to the special features of each country, safety standards for assessing power station sites should be applied in an appropriate and flexible manner. The paper describes the geological and meteorological features of the three sites and summarizes the studies carried out in these fields. It refers particularly to the hydrological studies carried out at Zorita and Santa Maria de Garofia and describes the weather stations set up at both sites, the diffusion experiments with neutcal-buoyancy balloons at Santa Maria de Garofia, and the results of these investigations. (author) [Spanish] Se analizan y describen los emplazamientos de tres centrales nucleares espanolas: la central de Zorita, de 153 MW(e), con reactor de agua a presion y sistema de contencion simple; la central de Santa Maria de Garofia, de 380 MW

  19. Assessment of Power Potential of Tidal Currents and Impacts of Power Extraction on Flow Speeds in Indonesia

    Science.gov (United States)

    Orhan, K.; Mayerle, R.

    2016-12-01

    A methodology comprising of the estimates of power yield, evaluation of the effects of power extraction on flow conditions, and near-field investigations to deliver wake characteritics, recovery and interactions is described and applied to several straits in Indonesia. Site selection is done with high-resolution, three-dimensional flow models providing sufficient spatiotemporal coverage. Much attention has been given to the meteorological forcing, and conditions at the open sea boundaries to adequately capture the density gradients and flow fields. Model verification using tidal records shows excellent agreement. Sites with adequate depth for the energy conversion using horizontal axis tidal turbines, average kinetic power density greater than 0.5 kW/m2, and surface area larger than 0.5km2 are defined as energy hotspots. Spatial variation of the average extractable electric power is determined, and annual tidal energy resource is estimated for the straits in question. The results showed that the potential for tidal power generation in Indonesia is likely to exceed previous predictions reaching around 4,800MW. To assess the impact of the devices, flexible mesh models with higher resolutions have been developed. Effects on flow conditions, and near-field turbine wakes are resolved in greater detail with triangular horizontal grids. The energy is assumed to be removed uniformly by sub-grid scale arrays of turbines, and calculations are made based on velocities at the hub heights of the devices. An additional drag force resulting in dissipation of the pre-existing kinetic power from %10 to %60 within a flow cross-section is introduced to capture the impacts. It was found that the effect of power extraction on water levels and flow speeds in adjacent areas is not significant. Results show the effectivess of the method to capture wake characteritics and recovery reasonably well with low computational cost.

  20. Survey on construction of the database for new energy technology development. Fuel cell; Shin energy gijutsu kaihatsu kankei data shu sakusei chosa. Nenryo denchi

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    As a part of the data related to technological development of new energy, the database for fuel cells was prepared. The major international conferences held in fiscal 1996 were reviewed. As the atmosphere of the whole conference, phosphoric acid fuel cell (PAFC) is in a stage just before practical use, and molten carbonate fuel cell (MCFC) is in a stage of the demonstration study of MW class one. The study on solid oxide fuel cell (SOFC) and polymer electrolyte fuel cell (PEFC) is in considerable progress. In particular, the application of PEFC to automobiles is in real investigation. For the database, kinds and features of various fuel cells, operation principles, system configurations of FC plants, application fields, and characteristics were arranged. Field test examples for public and industrial uses were separately arranged, and in particular, the application examples of PAFC were presented together with developmental conditions of the other fuel cells. Overseas situations were equal to domestic ones, and their marketability was predicted. The Japanese subsidy policy and some U.S. policies were also arranged. 28 refs., 51 figs., 37 tabs.

  1. On-Site Renewable Energy and Green Buildings: A System-Level Analysis.

    Science.gov (United States)

    Al-Ghamdi, Sami G; Bilec, Melissa M

    2016-05-03

    Adopting a green building rating system (GBRSs) that strongly considers use of renewable energy can have important environmental consequences, particularly in developing countries. In this paper, we studied on-site renewable energy and GBRSs at the system level to explore potential benefits and challenges. While we have focused on GBRSs, the findings can offer additional insight for renewable incentives across sectors. An energy model was built for 25 sites to compute the potential solar and wind power production on-site and available within the building footprint and regional climate. A life-cycle approach and cost analysis were then completed to analyze the environmental and economic impacts. Environmental impacts of renewable energy varied dramatically between sites, in some cases, the environmental benefits were limited despite the significant economic burden of those renewable systems on-site and vice versa. Our recommendation for GBRSs, and broader policies and regulations, is to require buildings with higher environmental impacts to achieve higher levels of energy performance and on-site renewable energy utilization, instead of fixed percentages.

  2. Proyecto de acompañamiento familiar y comunitario sistematización de la experiencia

    OpenAIRE

    Campos Cáceres, Gladys Rocio

    2015-01-01

    Este trabajo describe la sistematización de la experiencia Proyecto de acompañamiento familiar y comunitario a las familias del barrio Altos del Cacique de Bucaramanga (PAFC), implementado en el primer semestre del año 2013. Los objetivos propuestos fueron sistematizar el PAFC e identificar las prácticas co-construidas significativas y las fases de mayor impacto en la implementación. El eje de sistematización definido estuvo centrado en las metodologías sistémicas y posmodernas...

  3. Oxidation of Methionine by Tripropylammonium Fluorochromate-A Kinetic and Mechanistic Study

    Directory of Open Access Journals (Sweden)

    S. Sheik Mansoor

    2011-01-01

    Full Text Available The kinetics of oxidation of methionine (Met by tripropylammonium fluorochromate (TriPAFC has been studied in the presence of chloroacetic acid in aqueous acetic acid medium. The reaction is first order with respect to methionine, TriPAFC and acid. The reaction rate has been determined at different temperatures and activation parameters calculated. With an increase in the amount of acetic acid in its aqueous mixture, the rate increases. The reaction does not induce polymerization of acrylonitrile. A suitable mechanism has been proposed.

  4. Nuclear power plants in Germany. Recent developments in off-site nuclear emergency preparedness and response; Kernkraftwerke in Deutschland. Neue Entwicklungen im anlagenexternen Notfallschutz

    Energy Technology Data Exchange (ETDEWEB)

    Gering, Florian [Bundesamt fuer Strahlenschutz, Oberschleissheim/Neuherberg (Germany). Abt. SW 2.2 Entscheidungshilfesysteme, Lageermittlung und Kommunikation

    2014-10-15

    The reactor accident in Fukushima, Japan, in 2011 triggered a thorough review of the off-site emergency preparedness and response for nuclear power plants in Germany. ''Off-site emergency preparedness and response'' includes all actions to protect the public outside the fence of a nuclear power plant. This review resulted in several changes in off-site emergency preparedness and response, which are briefly described in this article. Additionally, several recent activities are described which may influence emergency preparedness and response in the future.

  5. Circulating Tumor Cell Detection and Capture by Photoacoustic Flow Cytometry in Vivo and ex Vivo

    Energy Technology Data Exchange (ETDEWEB)

    Galanzha, Ekaterina I. [Phillips Classic Laser and Nanomedicine Laboratories, University of Arkansas for Medical Sciences, 4301 West Markham Street, Little Rock, AR 72205 (United States); Zharov, Vladimir P., E-mail: zharovvladimirp@uams.edu [Phillips Classic Laser and Nanomedicine Laboratories, University of Arkansas for Medical Sciences, 4301 West Markham Street, Little Rock, AR 72205 (United States); Arkansas Nanomedicine Center, University of Arkansas for Medical Sciences, 4301 West Markham Street, Little Rock, AR 72205 (United States)

    2013-12-10

    Despite progress in detecting circulating tumor cells (CTCs), existing assays still have low sensitivity (1–10 CTC/mL) due to the small volume of blood samples (5–10 mL). Consequently, they can miss up to 10{sup 3}–10{sup 4} CTCs, resulting in the development of barely treatable metastasis. Here we analyze a new concept of in vivo CTC detection with enhanced sensitivity (up to 10{sup 2}–10{sup 3} times) by the examination of the entire blood volume in vivo (5 L in adults). We focus on in vivo photoacoustic (PA) flow cytometry (PAFC) of CTCs using label-free or targeted detection, photoswitchable nanoparticles with ultrasharp PA resonances, magnetic trapping with fiber-magnetic-PA probes, optical clearance, real-time spectral identification, nonlinear signal amplification, and the integration with PAFC in vitro. We demonstrate PAFC’s capability to detect rare leukemia, squamous carcinoma, melanoma, and bulk and stem breast CTCs and its clusters in preclinical animal models in blood, lymph, bone, and cerebrospinal fluid, as well as the release of CTCs from primary tumors triggered by palpation, biopsy or surgery, increasing the risk of metastasis. CTC lifetime as a balance between intravasation and extravasation rates was in the range of 0.5–4 h depending on a CTC metastatic potential. We introduced theranostics of CTCs as an integration of nanobubble-enhanced PA diagnosis, photothermal therapy, and feedback through CTC counting. In vivo data were verified with in vitro PAFC demonstrating a higher sensitivity (1 CTC/40 mL) and throughput (up to 10 mL/min) than conventional assays. Further developments include detection of circulating cancer-associated microparticles, and super-resolution PAFC beyond the diffraction and spectral limits.

  6. Heuristic and probabilistic wind power availability estimation procedures: Improved tools for technology and site selection

    Energy Technology Data Exchange (ETDEWEB)

    Nigim, K.A. [University of Waterloo, Waterloo, Ont. (Canada). Department of Electrical and Computer Engineering; Parker, Paul [University of Waterloo, Waterloo, Ont. (Canada). Department of Geography, Environmental Studies

    2007-04-15

    The paper describes two investigative procedures to estimate wind power from measured wind velocities. Wind velocity data are manipulated to visualize the site potential by investigating the probable wind power availability and its capacity to meet a targeted demand. The first procedure is an availability procedure that looks at the wind characteristics and its probable energy capturing profile. This profile of wind enables the probable maximum operating wind velocity profile for a selected wind turbine design to be predicted. The structured procedures allow for a consequent adjustment, sorting and grouping of the measured wind velocity data taken at different time intervals and hub heights. The second procedure is the adequacy procedure that investigates the probable degree of availability and the application consequences. Both procedures are programmed using MathCAD symbolic mathematical software. The math tool is used to generate a visual interpolation of the data as well as numerical results from extensive data sets that exceed the capacity of conventional spreadsheet tools. Two sites located in Southern Ontario, Canada are investigated using the procedures. Successful implementation of the procedures supports informed decision making where a hill site is shown to have much higher wind potential than that measured at the local airport. The process is suitable for a wide spectrum of users who are considering the energy potential for either a grid-tied or off-grid wind energy system. (author)

  7. Siting of nuclear power plants in densely populated countries

    International Nuclear Information System (INIS)

    Togo, Y.

    1981-01-01

    In evaluating the safety of reactor siting, three typical approaches can be applied; the deterministic approach, the probabilistic approach and the combined approach. In regard to a risk associated with siting, the design of a reactor has to do with both individual and societal risk, while exclusion distance mainly has to do with individual risk, and surrounding population primarily has to do with societal risk. Consequently, in a densely populated area, more attention should be paid to societal risk. There are many reactor sites in the world which can be described as concentrated siting. Although concentrated siting has a lot of merits, such as reducing the construction cost or maintenance cost of reactors, more careful consideration should be paid to safety-related matters of such concentrated reactors because the risk to the individual from accidents caused by concentrated reactors is larger than that from a single reactor. As for the recent controversial issue concerning siting criteria, it appears that the present international consensus on siting philosophy is still valid after the TMI accident. (author)

  8. Population dose commitments due to radioactive releases from nuclear power plant sites in 1981. Volume 3

    International Nuclear Information System (INIS)

    Baker, D.A.; Peloquin, R.A.

    1985-01-01

    Population radiation dose commitments have been estimated from reported radionuclide releases from commercial power reactors operating during 1981. Fifty-year dose commitments from a one-year exposure were calculated from both liquid and atmospheric releases for four population groups (infant, child, teenager and adult) residing between 2 and 80 km from each site. This report tabulates the results of these calculations, showing the dose commitments for both liquid and airborne pathways for each age group and organ. Also included for each site is a histogram showing the fraction of the total population within 2 to 80 km around each site receiving various average dose commitments from the airborne pathways. The total dose commitment from both liquid and airborne pathways from 48 sites ranged from a high of 20 person-rem to a low of 0.008 person-rem with an arithmetic mean of 3 person-rem. The total population dose for all sites was estimated at 160 person-rem for the 98 million people considered at risk

  9. Possible sites for future nuclear power plants in Israel

    Energy Technology Data Exchange (ETDEWEB)

    Yaar, Ilan, E-mail: ilany@energy.gov.il [Ministry of National Infrastructure, Energy and Water Resources, Chief Scientist Office, 14 Hartum St., POB 36148, Jerusalem 9136002 (Israel); Walter, Ayelet [Ministry of National Infrastructure, Energy and Water Resources, Chief Scientist Office, 14 Hartum St., POB 36148, Jerusalem 9136002 (Israel); Sanders, Yovav [Sysnet Group, Habarzel St. 32, Tel Aviv 69710 (Israel); Felus, Yaron [Survey of Israel, 1 Lincoln St., POB 14171, Tel-Aviv 61141 (Israel); Calvo, Ran; Hamiel, Yariv [Geological Survey of Israel, 30 Malkhe Israel St., Jerusalem 95501 (Israel)

    2016-03-15

    A preliminary work aimed at allocating suitable new sites for possible NPPs in Israel is presented. The work is based on Israel's present NPP siting criteria, supported by selected procedure performed by various countries that conducted similar process. The site selection process was conducted in two stages: first, a selection procedure using demographic analysis was conducted; second, a seismological and geological analysis process was performed in the remaining area. From the combined two screening processes results, an overall new area of 569 km{sup 2} was located as a possible area for future construction of NPPs in Israel. Further and more comprehensive work, based on the IAEAs site selection guidelines, has to be performed in the future, in order to verify the preliminary findings presented in this work.

  10. Report on the Decontamination Site Tour in Fukushima Prefecture

    International Nuclear Information System (INIS)

    Knezevic, Z.; Miljanic, S.; Ranogajec-Komor, M.; Milkovic, D; Osvay, M.

    2013-01-01

    In the frame of Japanese-Croatian scientific-technical cooperation, our team visited Minamisoma city in Fukushima prefecture, Japan on Dec 3, 2012. The visit was organized for the foreign participants at the 8th International Workshop on Ionizing Radiation Monitoring held in Oarai, Japan. Minamisoma city is about 25 kilometres north from Fukushima Nuclear Power Plant. The city belonged to the evacuation zone and most of the residents were forced to leave immediately after the accident in 2011. In spring 2012 most of the people were able to return to their homes since dose rates were less than 20 mSv/y, the standard that Japanese government set as a temporary maximum radiation limit. Recently, a project of 'Decontaminating the Living Areas in Minamisoma City' was established. Enormous job has been carried out at the decontamination site (washing the houses, collection of soil, cutting trees, collecting the waste, etc). However, according to some experts, the cost-benefit effect of applied radiation protection principle is questionable. Our team with other participants visited one decontamination site and one temporary waste disposal site. After that a Satellite Meeting entitled 'What can be done for the reconstruction of Fukushima' was organized. In the discussion special attention was given to the public information and communication considering well known fear from radiation and its influence to the future of nuclear power program.(author)

  11. Does nuclear power-related facility siting always lower the local property Values? Comparative analysis among the sites in Japan

    International Nuclear Information System (INIS)

    Yamane, Fumihiro; Ohgaki, Hideaki; Asano, Kota

    2011-01-01

    Yamane et al. (2011) carried out hedonic house rent analyses for several nuclear power plant sites in Japan, compared the result for each plant, and obtained some empirical results indicating that the local residents' marginal willingness-to-pay (MWTP) for living near the plant was not necessarily positive and that the MWTP was correlated with operation years of the plants and some of the host communities' attributes (i.e., population density, financial condition and public service improvement). However, these results may suffer from biases and inefficiency in estimating hedonic functions, caused by spatial dependency: spatial autoregression and spatial autocorrelation. In this paper, we introduce spatial econometric techniques to settle this problem. As a revised result, it is indicated that the local residents' MWTP is correlated with past accidents in the plants, education service improvement in the host communities and so on. (author)

  12. Next Generation Nuclear Plant Project Evaluation of Siting a HTGR Co-generation Plant on an Operating Commercial Nuclear Power Plant Site

    International Nuclear Information System (INIS)

    Demick, L.E.

    2011-01-01

    This paper summarizes an evaluation by the Idaho National Laboratory (INL) Next Generation Nuclear Plant (NGNP) Project of siting a High Temperature Gas-cooled Reactor (HTGR) plant on an existing nuclear plant site that is located in an area of significant industrial activity. This is a co-generation application in which the HTGR Plant will be supplying steam and electricity to one or more of the nearby industrial plants.

  13. Next Generation Nuclear Plant Project Evaluation of Siting a HTGR Co-generation Plant on an Operating Commercial Nuclear Power Plant Site

    Energy Technology Data Exchange (ETDEWEB)

    L.E. Demick

    2011-10-01

    This paper summarizes an evaluation by the Idaho National Laboratory (INL) Next Generation Nuclear Plant (NGNP) Project of siting a High Temperature Gas-cooled Reactor (HTGR) plant on an existing nuclear plant site that is located in an area of significant industrial activity. This is a co-generation application in which the HTGR Plant will be supplying steam and electricity to one or more of the nearby industrial plants.

  14. Modelling and analysis of radionuclide dispersion from PWR on abnormal condition in Bojanegara Serang site

    International Nuclear Information System (INIS)

    Sri Kuntjoro

    2010-01-01

    Additional of electrical power especially Nuclear Power Plant will give radiological consequence sto population and environment due to radioactive release in normal and abnormal condition. In consequence the management of nuclear power plant must supply data and strong argumentation to clarify the safety of nuclear power plant to environment. For that purpose it needs to be carried out an analysis of abnormal condition in nuclear power plant and its radiological consequences to the environment. That analysis is done using abnormal condition simulation model postulated on 1000 MWe nuclear power plant.That simulation model is used also to evaluate environmental potential as site capability in supporting the radiological consequences. Radionuclide transport modeling from reactor core to containment uses EMERALD computer code. Other computer codes are Wind rose, PC-COSYMA and Arc View are used to simulate meteorology condition, radionuclide release to population distribution of food production and consumption and distribution of radiation dose received to population around nuclear power plant. Application of that simulation is carried out to NPP candidate site in Bojanegara-Kramatwatu, Serang Banten peninsula. Using source term data, meteorology data, dispersion data and pathways modeling are resulting radionuclide dispersion model and radiation pathway acceptance at the surrounding nuclear power plant site (Bojanegara-Serang peninsula). The result shows that maximum radiation dose received is lower than dose permitted in accordance with regulatory body (BAPETEN). (author)

  15. Analytical evaluation on loss of off-side electric power simulation of the High Temperature Engineering Test Reactor

    International Nuclear Information System (INIS)

    Takeda, Takeshi; Nakagawa, Shigeaki; Tachibana, Yukio; Takada, Eiji; Kunitomi, Kazuhiko

    2000-03-01

    A rise-to-power test of the high temperature engineering test reactor (HTTR) started on September 28 in 1999 for establishing and upgrading the technological basis for the high temperature gas-cooled reactor (HTGR). A loss of off-site electric power test of the HTTR from the normal operation under 15 and 30 MW thermal power will be carried out in the rise-to-power test. Analytical evaluations on transient behaviors of the reactor and plant during the loss of off-site electric power were conducted. These estimations are proposed as benchmark problems for the IAEA coordinated research program on 'Evaluation of HTGR Performance'. This report describes an event scenario of transient during the loss of off-site electric power, the outline of major components and system, detailed thermal and nuclear data set for these problems and pre-estimation results of the benchmark problems by an analytical code 'ACCORD' for incore and plant dynamics of the HTGR. (author)

  16. Fiscal 1997 research report on the PV power generation field test project for public facilities. Evaluation and analysis of collected data for every site (2/3); 1997 nendo kokyo shisetsu nadoyo taiyoko hatsuden field test jigyo ni okeru shushu data hyoka kaiseki. Kaku site betsu (2/3)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-07-01

    As a part of the PV power generation field test project, this report summarizes the monthly collected data for every site in fiscal 1996. Collected data items are as follows: horizontal/total/effective solar irradiation (kWh/m{sup 2}), average air temperature, array power, system power, load power, power system supply load, reverse power flow (kWh for every item), power system protective operation frequency, system disinterconnection time (min), system operation time (min), self-operation load, self-supply load, equivalent array/system operation time, array/system performance ratio, system use factor, system generation efficiency, effective inverter efficiency, and inverter load factor. The test sites include various public facilities such as doctor's office, newspaper office, general building for public corporations, primary school, hot water pool, health center, public hall, town/ward office, water purification plant, consumers' cooperative (CO-OP), university, high school, technical center, training center, nursery school, kindergarten, and nursing home for the aged. (NEDO)

  17. The role of environmental survey laboratory at Nuclear Power Plants sites in India in environmental awareness and education programmes

    International Nuclear Information System (INIS)

    Hegde, A.G.; Singhal, R.K.; Sharma, R.M.

    2004-01-01

    Increased public awareness of nuclear power runs the gamut from immediate disengagement to whole-hearted approval of the use of and expansion of this energy source. The involved study carried out at different Environmental Survey Laboratories (ESL) is mainly responsible for the environment friendly attitudes of the large section of public. The scientists working in these laboratories collected vast data on different environmental issues related to releases of very low levels of radioactivity in the environment. The total dose received by a hypothetical individual member of public (critical group) evaluated at plant boundary i.e. 1.6 km zone is generally in the range of 2-50 mSv/y which is about two order of magnitude less compared to limits prescribed by the Atomic Energy Regulatory Board (AERB) and International Commission on Radiological Protection ICRP) suggested value of 1 mSv/y. The ESL staff give special attention to communicate to the public to clear their queries and dislodge, their misconception about the nuclear facilities operating at their site. At ESL, various environmental pathways responsible for radiation dose and their impact on different environmental matrices are nicely presented in the form of charts and posters. Site and off-site emergency exercise are conducted regularly in co-ordination with inter governmental agencies responsible for mass sheltering, medical facilities and transportation. During these exercises mass communication programme are conducted to educate the public in the vicinity of Nuclear Power Plants Sites. ESL also updates from time to time the population distribution data within 30 km radial zone and the dietary habit of the population within this zone. (author)

  18. Preliminary accident analysis of Loss of Off-Site Power and In-Box LOCA for the CFETR helium cooled solid breeder blanket

    Energy Technology Data Exchange (ETDEWEB)

    Lian, Qiang; Cui, Shijie [School of Nuclear Science and Technology, Xi’an Jiaotong University, Xi’an, 710049 (China); Shaanxi Key Lab. of Advanced Nuclear Energy and Technology, Xi’an Jiaotong University, Xi’an, 710049 (China); Tian, Wenxi, E-mail: wxtian@mail.xjtu.edu.cn [School of Nuclear Science and Technology, Xi’an Jiaotong University, Xi’an, 710049 (China); Shaanxi Key Lab. of Advanced Nuclear Energy and Technology, Xi’an Jiaotong University, Xi’an, 710049 (China); Zhang, Jing; Zhang, Dalin; Su, G.H. [School of Nuclear Science and Technology, Xi’an Jiaotong University, Xi’an, 710049 (China); Shaanxi Key Lab. of Advanced Nuclear Energy and Technology, Xi’an Jiaotong University, Xi’an, 710049 (China)

    2017-05-15

    Highlights: • The CFETR HCSB blanket has been investigated using RELAP5. • Loss of Off-Site Power is investigated. • The parametric analyses during In-Box LOCA are investigated. • The HCSB blanket for CFETR is designed with sufficient decay heat removal capability. - Abstract: As one of three candidate tritium breeding blanket concepts for Chinese Fusion Engineering Test Reactor (CFETR), a conceptual structure of helium cooled solid breeder (HCSB) blanket was recently proposed. In this paper, the preliminary thermal-hydraulic and safety analyses of the typical outboard equatorial blanket module (No.12) have been carried out using RELAP5/Mod3.4 code. Two design basis accidents are investigated based on the steady-state initialization, including Loss of Off-Site Power and In-Box Loss of Coolant Accident (LOCA). The differences between circulator coast down and circulator rotor locked under Loss of Off-Site Power are compared. Regarding the In-Box LOCA, the influences of different break sizes and locations are thoroughly analyzed based on a relatively accurate modeling method of the heat structures in sub-modules. The analysis results show that the blanket and the combined helium cooling system (HCS) are designed with sufficient decay heat removal capability for both accidents, which can preliminarily verify the feasibility of the conceptual design. The research work can also provide an important reference for parameter optimization of the blanket and its HCS in the next stage.

  19. On-site emergency planning

    International Nuclear Information System (INIS)

    Kueffer, K.

    1980-01-01

    This lecture covers the Emergency Planning of the Operating organization and is based on the Code of Practice and Safety Guides of the IAEA as well as on arrangements in use at the Swiss Nuclear Power Station Beznau and - outlines the basis and content of an emergency plan - describes the emergencies postulated for emergency planning purposes - describes the responsibilities, the organization and the procedures of the operating organization to cope with emergency situations and the liaison between the operating organization, the regulatory body and public authorities - describes the facilities and equipment which should be available to cope with emergency sitauations - describes the measures and actions to be taken when an emergency arises in order to correct abnormal plant conditions and to protect the persons on-and off-site - describes the aid to be given to affected personnel - describes the aspects relevant to maintaining the emergency plan and organization in operational readiness. (orig./RW)

  20. On-site and off-site activities

    International Nuclear Information System (INIS)

    Martin, H.D.

    1986-01-01

    Design principles for NPP training programs. Effects of NPP contracts. Effects of domestic industrial activities. The role of international bodies. Requirements for on-site training. Training abroad, technical, financial and social aspects. Training center on-site, an evaluation. (orig.)

  1. Fiscal 1996 research report on the PV power generation field test project for public facilities. Evaluation and analysis of collected data for every site (1/2); 1996 nendo kokyo shisetsu nadoyo taiyoko hatsuden field test jigyo ni okeru shushu data hyoka kaiseki. Kaku site betsu (1/2)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-07-01

    As a part of the PV power generation field test project, this report summarizes the monthly collected data for every site in fiscal 1996. The test sites include various public facilities such as park, school, university, museum, Shinkansen platform, laboratory, technical center, training building, local governmental hotel, health athletic center, community center, joint purchase center, consumers' cooperative (CO-OP), school meals provision center, prefectural office building, police station garage, water purification plant, general disaster prevention center, and health center. Collected data items are as follows: total solar irradiation (kWh/m{sup 2}), average air temperature, array power, system power, load power, power system supply load, reverse power flow, self supply load (kWh for every item), system disinterconnection time (min), system operation time (min), equivalent array/system operation time, array/system performance ratio, system use factor, system generation efficiency, effective inverter efficiency, and inverter load factor. (NEDO)

  2. Report (2) of the Committee on Nuclear Power, Overall Energy Council

    International Nuclear Information System (INIS)

    1981-01-01

    In the efforts to reduce the reliance on petroleum with substitute energy sources, nuclear power plays the most important role. For the purpose, obtaining popular understanding and trust toward nuclear power, especially in the locality, is extremely significant in the promotion of the location of nuclear power stations. The measures taken by both electric power enterprises and the Government must start with this appreciation. The contents of the report by the Committee on Nuclear Power, which studied the safety of nuclear power generation and the promotion of the location of nuclear power plants are as follows: securing of nuclear power safety involving the establishment of popular trust, safety efforts on the side of electric power enterprises and strengthening of the governmental safety administration; promotion of siting nuclear power stations involving the acceptance by the nation and by the local people, local welfare, lead-time reduction, etc. (J.P.N.)

  3. Advanced on-site conceptual simulator for Forsmark 3

    International Nuclear Information System (INIS)

    Johansson, G.; Sjoestrand, K.

    1984-01-01

    On-site conceptual simulators have been extensively used at Swedish nuclear power plants. Despite having access to identical replica simulators, both the Swedish State Power Board and the Swedish private power industry have ordered conceptual simulators during 1982. The motivation has been that a complete training programme requires access to both a replica and a conceptual simulator. The replica simulator is perfect for training in control room behaviour but less appropriate for ensuring deeper process understanding. On the other hand, the conceptual simulator is not well suited for getting the personnel acquainted with the control room but is perfect for extending their knowledge of the plant processes. In order to give a realistic description of these processes, the conceptual simulator model must be fairly advanced. The Forsmark 3 conceptual simulator simulates the entire primary system, including the details of the steam and feedwater systems. Considerable attention has also been devoted to the presentation of calculated variables. For example, all the variables in the data base (approx. 6600) can be presented on colour-graphic CRTs as functions of time. (author)

  4. External human induced events in site evaluation for nuclear power plants. Safety guide

    International Nuclear Information System (INIS)

    2004-01-01

    The purpose of the present Safety Guide is to provide recommendations and guidance for the examination of the region considered for site evaluation for a plant in order to identity hazardous phenomena associated with human induced events initiated by sources external to the plant. In some cases it also presents preliminary guidance for deriving values of relevant parameters for the design basis. This Safety Guide is also applicable for periodic site evaluation and site evaluation following a major human induced event, and for the design and operation of the site's environmental monitoring system. Site evaluation includes site characterization. Consideration of external events that could lead to a degradation of the safety features of the plant and cause a release of radioactive material from the plant and/or affect the dispersion of such material in the environment. And consideration of population issues and access issues significant to safety (such as the feasibility of evacuation, the population distribution and the location of resources). The process of site evaluation continues throughout the lifetime of the facility, from siting to design, construction, operation and decommissioning. The external human induced events considered in this Safety Guide are all of accidental origin. Considerations relating to the physical protection of the plant against wilful actions by third parties are outside its scope. However, the methods described herein may also have some application for the purposes of such physical protection. The present Safety Guide may also be used for events that may originate within the boundaries of the site, but from sources which are not directly involved in the operational states of the nuclear power plant units, such as fuel depots or areas for the storage of hazardous materials for the construction of other facilities at the same site. Special consideration should be given to the hazardous material handled during the construction, operation and

  5. Wind power research at Oregon State University. [for selecting windpowered machinery sites

    Science.gov (United States)

    Hewson, E. W.

    1973-01-01

    There have been two primary thrusts of the research effort to date, along with several supplementary ones. One primary area has been an investigation of the wind fields along coastal areas of the Pacific Northwest, not only at the shoreline but also for a number of miles inland and offshore as well. Estimates have been made of the influence of the wind turbulence as measured at coastal sites in modifying the predicted dependence of power generated on the cube of the wind speed. Wind flow patterns in the Columbia River valley have also been studied. The second primary thrust has been to substantially modify and improve an existing wind tunnel to permit the build up of a boundary layer in which various model studies will be conducted. One of the secondary studies involved estimating the cost of building an aerogenerator.

  6. Feasibility Study of Economics and Performance of Solar Photovoltaics at the Standard Chlorine of Delaware Superfund Site in Delaware City, Delaware. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    Energy Technology Data Exchange (ETDEWEB)

    Salasovich, J.; Geiger, J.; Mosey, G.; Healey, V.

    2013-06-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Standard Chlorine of Delaware site in Delaware City, Delaware, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.

  7. Feasibility Study of Economics and Performance of Solar Photovoltaics at the Former Bethlehem Steel Plant Brownfield Site in Lackawanna, New York. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    Energy Technology Data Exchange (ETDEWEB)

    Salasovich, J.; Geiger, J.; Mosey, G.; Healey, V.

    2013-04-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Former Bethlehem Steel Plant site in Lackawanna, New York, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.

  8. Regulatory inspection activities on nuclear power plant sites during construction in the United Kingdom

    International Nuclear Information System (INIS)

    Jeffery, J.V.

    1977-01-01

    The work of regulatory inspection of the construction of the plant on the site is performed not only by the inspector who has been allocated to inspection duties for that site but also by the specialist staff who are involved with the safety assessment of the plant. The co-ordination of this work is described in the paper and examples are given of inspection activities associated with the enforcement requirements of licence conditions as well as those related to the inspection of the plant itself. (author)

  9. Building technology on construction site of nuclear power plant at Zaporozh'e

    Energy Technology Data Exchange (ETDEWEB)

    Dusek, R; Matyas, V [Vodni Stavby, Prague (Czechoslovakia)

    1981-12-01

    Basic data and technical and economic indexes are shown for a WWER 1000 nuclear power plant being built 120 km off Zaporozh'e (USSR). The schedule of construction and the choice of the means of mechanization used for building work are reported. Discussed are building machines used, the location of assembly cranes of the main unit, the design and the building technology of the reactor part, the engine house, deisel generator station, the special operations building, the use of concrete and steel units in the building, and the procurement of materials for the construction. The knowledge gained from the building of the power plant will be applied in the CSSR in the building of 1000 MW unit power plants.

  10. American National Standard: criteria and guidelines for assessing capability for surface faulting at nuclear power plant sites

    International Nuclear Information System (INIS)

    Anon.

    1982-01-01

    This standard provides applicants and consultants with criteria and guidelines for investigations directed toward the assessment of the capability for surface faulting at nuclear power plant sites. Assessment of vibratory ground motion resulting from faulting is not treated in these guidelines

  11. Investigation on preparing data collections related to new energy technology development. Fuel cells; Shin energy gijutsu kaihatsu kankei data shu sakusei chosa. Nenryo denchi

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    With an objective to put data related to fuel cells systematically into order, related data were collected comprehensively. Reviewing large international conferences impresses dawn of commercialization in phosphoric acid fuel cells (PAFC), take-off of megawatt-class molten carbonate fuel cells (MCFC), and remarkable advancement in studies on solid oxide fuel cells (SOFC) and polymer electrolyte fuel cells (PEFC). The data collection may be compiled as follows: basic principles, features, operation principles, system configurations, utilization fields, and characteristics were summarized on fuel cell power generation systems using phosphoric acid, polymer, molten carbonate, solid oxide, and alkaline fuel cells; major installation examples in Japan and overseas countries were summarized; investigations were given on developing other fuel cells such as alkaline type and direct methanol type fuel cells; and marketability, subsidies operations in Japan, and states of policy implementation in the U.S.A. were investigated and put into order. 22 refs., 24 figs., 21 tabs.

  12. An Extreme Meteorological Events Analysis For Nuclear Power Plant (NPP) Siting Project at Bangka Island, Indonesia

    Science.gov (United States)

    Septiadi, Deni; S, Yarianto Sugeng B.; Sriyana; Anzhar, Kurnia; Suntoko, Hadi

    2018-03-01

    The potential sources of meteorological phenomena in Nuclear Power Plant (NPP) area of interest are identified and the extreme values of the possible resulting hazards associated which such phenomena are evaluated to derive the appropriate design bases for the NPP. The appropriate design bases shall be determined according to the Nuclear Energy Regulatory Agency (Bapeten) applicable regulations, which presently do not indicate quantitative criteria for purposes of determining the design bases for meteorological hazards. These meteorological investigations are also carried out to evaluate the regional and site specific meteorological parameters which affect the transport and dispersion of radioactive effluents on the environment of the region around the NPP site. The meteorological hazards are to be monitored and assessed periodically over the lifetime of the plant to ensure that consistency with the design assumptions is maintained throughout the full lifetime of the facility.

  13. Evaluation of environmental data relating to selected nuclear power plant sites. A synthesis and summary with recommendations

    International Nuclear Information System (INIS)

    Murarka, I.P.; Policastro, A.J.; Ferrante, J.G.; Daniels, E.W.; Marmer, G.J.

    1976-11-01

    An analysis of the fuel data gathered during the monitoring programs at seven nuclear power plant sites show no significant ecological impacts. This conclusion is within the constraints of the quality of available data from these sites. Current monitoring programs are, however, not designed to meet the needs for statistical analysis and, consequently, the monitoring data are often ill-suited for modern statistical procedures. Recommendations are proposed for revising monitoring schemes so that more precise conclusions can be made from fewer field measurements

  14. Organization and duties of the site supervisory staff

    International Nuclear Information System (INIS)

    Macqueron, J.F.

    1976-01-01

    There are two distinct phases in building a nuclear power station: The first involves the choice of the site, and the second is building the power station on the site chosen. The decision as to the site requires a long series of studies undertaken by the electricity-producing authority in France (Electricite de France) in close liaison with the government and the public, its elected representatives and municipalities. The building of a power station takes place according to the following procedure: The general, installation and operational studies and the accident-simulation studies are carried out by the planning departments of the Regional Equipment Organizations; the works department of the Regional Equipment Organizations controls and follows up the manufacture of equipment in the factory; coordination of on-site erection, trials on site and start-up of the installations are carried out by the development section of the works department. (orig./HP) [de

  15. Working group 4b: Regional aspects. Siting in Walloon region and offshore

    International Nuclear Information System (INIS)

    Wilmes, Ph.; Fincoeur, P.; Slegers, G.

    1976-01-01

    Four nuclear power plant solutions in view of siting have been considered. a) Saturation of the existing sites. The only site considered is Tihange where a 870 MWe power plant is operated and a 930 MWe is under construction. b) Creation of new sites only for the production of electrical power and/or thermal energy. There are two possibilities: the creation of a new site for big power stations on the Meuse river and the spreading of power plants of two kinds: supply of electricity only and double purpose production: vapor/electricity or heat/electricity. c) Creation of complete sites for the transformation of nuclear material: enrichment of fissile material; fuel elements fabrication, burning, spent fuel reprocessing and waste management. d) Off-shore power plant siting and the creation of an artificial island. (A.F.)

  16. Fuel cells: Trends in research and applications

    Science.gov (United States)

    Appleby, A. J.

    Various aspects of fuel cells are discussed. The subjects addressed include: fuel cells for electric power production; phosphoric acid fuel cells; long-term testing of an air-cooled 2.5 kW PAFC stack in Italy; status of fuel cell research and technology in the Netherlands, Bulgaria, PRC, UK, Sweden, India, Japan, and Brazil; fuel cells from the manufacturer's viewpoint; and fuel cells using biomass-derived fuels. Also examined are: solid oxide electrolye fuel cells; aluminum-air batteries with neutral chloride electrolyte; materials research for advanced solid-state fuel cells at the Energy Research Laboratory in Denmark; molten carbonate fuel cells; the impact of the Siemens program; fuel cells at Sorapec; impact of fuel cells on the electric power generation systems in industrial and developing countries; and application of fuel cells to large vehicles.

  17. Site response calculations for nuclear power plants

    International Nuclear Information System (INIS)

    Wight, L.H.

    1975-01-01

    Six typical sites consisting of three soil profiles with average shear wave velocities of 800, 1800, and 5000 ft/sec as well as two soil depths of 200 and 400 ft were considered. Seismic input to these sites was a synthetic accelerogram applied at the surface and corresponding to a statistically representative response spectrum. The response of each of these six sites to this input was calculated with the SHAKE program. The results of these calculations are presented

  18. Design/licensing of on-site package for core component

    International Nuclear Information System (INIS)

    Ogasawara, K.; Chohzuka, T.; Shimura, T.; Kikuchi, T.; Fujiwara, R.; Karigome, S.; Takani, M.

    1993-01-01

    For storage of used core components which are produced from reactors, Tohoku EPCO decided to construct a site bunker at Onagawa site. It was also decided to develop and fabricate one packaging to transport core components from the reactor buildings to the site bunker. The packaging will be used within the power station; therefore, it shall comply with 'The Law for the Business of Electric Power' and relevant Notification. The main requirements of the packaging are as follows: 1) The number of contents, such as channel boxes and control rods, shall be as large as possible. 2) The weight and the outer dimensions of the packaging shall be within the limitation of the reactor building and the site bunker. 3) Materials shall be selected from those which have been already applied for existing packagings and utilized without any problems. 4) It shall be considered during design of trunnions that handling equipment, such as lifting beam, can be used for not only this packaging but also for existing spent fuel packagings. The design of the packaging is completed and has been licensed. The packaging is scheduled to be utilized from November, 1993. (J.P.N.)

  19. Criteria of site assessment

    International Nuclear Information System (INIS)

    Gibbs, P.; Fuchs, H.

    1975-01-01

    The criteria which lead to the choice of a particular site for a nuclear power station are in general very similar to those which would apply to any other type of power station. The principal differences derive from the simpler transport problems for the fuel compared with, say, solid fuel and the special safety considerations which attach to nuclear reactors. The search for a suitable site obviously starts by considering where the power is needed, i.e. where the load centers are and also the existing transmission network which may help to bring the power from a more remote site to the load centers. This economic incentive to put the plant close to loads conflicts directly with the nuclear safety argument which favours more remote siting, and part of the problem of site selection is to reconcile these two matters. In addition, there are many other important matters which will be considered later concerning the adequacy of cooling water supplies, foundation conditions, etc., all of which must be examined in considerable detail. (orig./TK) [de

  20. Local negotiation on compensation siting of the spent nuclear fuel repository in Finland

    International Nuclear Information System (INIS)

    Kojo, Matti

    2007-01-01

    The aim of the paper is to analyse the local negotiation process between the Municipality of Eurajoki and the nuclear power company Teollisuuden Voima (TVO) and the nuclear waste management company Posiva Oy. The aim of the negotiations was to find an acceptable form of compensation for siting a spent nuclear fuel repository in Olkiluoto, Finland. The paper includes background information on the siting process in Finland, the local political setting in the Municipality of Eurajoki and a description of the negotiation process. The analysis of the negotiations on compensation is important for better understanding the progress of the Finnish siting process. The paper describes the picture of the contest to host the spent nuclear fuel repository. It also provides more information on the relationship between the Municipality of Eurajoki and the power company TVO. The negotiations on compensation and the roles of various players in the negotiations have not been studied in detail because the minutes of the Vuojoki liaison group were not available before the decision of the Supreme Administrative Court in May 2006. (author)

  1. Safety standards, legislation and codes of practice for fuel cell manufacture and operation

    Energy Technology Data Exchange (ETDEWEB)

    Wilcox, C.P.

    1999-07-01

    This report examines safety standards, legislation and codes of practice for fuel cell manufacture and operation in the UK, Europe and internationally. Management of health and safety in the UK is discussed, and the characteristics of phosphoric acid (PAFC), proton exchange membrane (PEM), molten carbonate (MCFC), solid oxide (SOFC) fuel cells are described. Fuel cell power plant standards and manufacture in the UK, design and operational considerations, end of life disposal, automotive fuel cell system, and fuelling and vehicular concerns are explored, and standards, legislation and codes of practice are explained in the appendix.

  2. Sites Pre-Screened for Wind Energy

    Data.gov (United States)

    U.S. Environmental Protection Agency — The RE-Powering Screening Dataset spreadsheet contains detailed site information on over 80,000 contaminated lands, landfills, and mine sites with screening results...

  3. Sites Pre-Screened for Solar Energy

    Data.gov (United States)

    U.S. Environmental Protection Agency — The RE-Powering Screening Dataset spreadsheet contains detailed site information on over 80,000 contaminated lands, landfills, and mine sites with screening results...

  4. Socioeconomic impacts: nuclear power station siting

    International Nuclear Information System (INIS)

    1977-06-01

    The rural industrial development literature is used to gain insights on the socioeconomic effects of nuclear power stations. Previous studies of large industrial facilities in small towns have important implications for attempts to understand and anticipate the impacts of nuclear stations. Even a cursory review of the nuclear development literature, however, reveals that industrialization research in rural sociology, economic geography and agricultural economics has been largely ignored

  5. Harmonic effects of solar geomagnetically induced currents on the electrical distribution system in nuclear power plants

    International Nuclear Information System (INIS)

    Carroll, D.P.; Kasturi, S.; Subudhi, M.; Gunther, W.

    1992-01-01

    Most previous analysis on the effects of geomagnetically induced currents (GIC) on electric utility systems has steady-state phenomena, with the main interest in the generator step-up transformer and the off-site power system. This paper begins to investigate the possible effects that a GIC event might have on the power plant itself, by examining the harmonic distortion that could exist at various voltage levels in the on-site distribution system

  6. Assessment of Economic Feasibility on Promising Wind Energy Sites in Myanmar

    OpenAIRE

    Soe, Thi Thi; Zheng, Maosheng; Aung, Zar Ni

    2016-01-01

    Due to lack of reliable wind data measured on site by high tower mast, the preliminarily wind atlas of Myanmar is forecasted with Modern Era Retrospective-analysis for Research and Application (MERRA) reanalysis data using in ArcGIS. From the result wind- map, the promising areas were found in Arakan, Pathein, Yangon, Ye which lie at coastal area in Myanmar and of which wind power density can be used for village power application with isolated-grid. To evaluate the annual energy production of...

  7. Research on definition of hard rock shear wave velocity of site for nuclear power plant

    International Nuclear Information System (INIS)

    Ding Zhenkun; Xia Zufeng

    2013-01-01

    Background: The definition of hard rock shear wave velocity is one of the most critical issues in the work of site selection. Purpose: To make a definition of hard rock site on which the model can be assumed as fixed-base condition, a series of research had been done. Several possible hard rock site soil models were developed. Methods: Shear wave velocity of hard rock had been assumed from 1100 m/s to 3200 m/s. For each case, free field analysis and soil structure analysis had been performed. And responses in soil and key nodes of structure were compared. Results: In free field analysis, responses of models that shear wave velocity below 2400 m/s decreased a lot. In SSI analysis, structure responses didn't change much when shear wave velocity was above 2400 m/s. Conclusions: 2400 m/s was the lowest shear wave velocity for hard rock site for fixed-base assumption. (authors)

  8. Evaluation of population density and distribution criteria in nuclear power plant siting

    International Nuclear Information System (INIS)

    Young, M.

    1994-06-01

    The NRC has proposed revisions to 10 CFR 100 which include the codification of nuclear reactor site population density limits to 500 people per square mile, at the siting stage, averaged over any radial distance out to 30 miles, and 1,000 people per square mile within the 40-year lifetime of a nuclear plant. This study examined whether there are less restrictive alternative population density and/or distribution criteria which would provide equivalent or better protection to human health in the unlikely event of a nuclear accident. This study did not attempt to directly address the issue of actual population density limits because there are no US risk standards established for the evaluation of population density limits. Calculations were performed using source terms for both a current generation light water reactor (LWR) and an advanced light water reactor (ALWR) design. The results of this study suggest that measures which address the distribution of the population density, including emergency response conditions, could result in lower average individual risks to the public than the proposed guidelines that require controlling average population density. Studies also indicate that an exclusion zone size, determined by emergency response conditions and reactor design (power level and safety features), would better serve to protect public health than a rigid standard applied to all sites

  9. The siting of nuclear power stations in Britain

    International Nuclear Information System (INIS)

    Wright, H.A.

    1975-01-01

    It is a fundamental precept that all prudent precautions should be taken. The secondary contribution to public safety derived by a proper choice of site must therefore be utilised. A siting policy should limit the choice of site but give the Utility sufficient freedom of choice to enable the more remote sites to be available for the adoption of new reactor types. For a significant release few people should be affected sufficiently to require evacuation, and account must also be taken of population centres possibly up to 20 miles from the site. (orig.) [de

  10. Beaver Valley Power Station and Shippingport Atomic Power Station. 1984 Annual environmental report, radiological. Volume 2

    International Nuclear Information System (INIS)

    1985-01-01

    This report describes the Radiological Environmental Monitoring Program conducted during 1984 in the vicinity of the Beaver Valley Power Station and the Shippingport Atomic Power Station. The Radiological Environmental Program consists of on-site sampling of water and gaseous effluents and off-site monitoring of water, air, river sediments, soils, food pathway samples, and radiation levels in the vicinity of the site. This report discusses the results of this monitoring during 1984. The environmental program outlined in the Beaver Valley Power Station Technical Specifications was followed throughout 1984. The results of this environmental monitoring program show that Shippingport Atomic Power Station and Beaver Valley Power Station operations have not adversely affected the surrounding environment. 23 figs., 18 tabs

  11. Fuel cells are gaining ground. Fuel cells as a key technology: future potential, state of the art, economic aspects, practical reports. Proceedings. Brennstoffzellen auf dem Vormarsch. Die Brennstoffzelle als Schluesseltechnologie. Zukunftspotentiale, Stand der Technik, Wirtschaftlichkeit und Praxisberichte. Tagungsband

    Energy Technology Data Exchange (ETDEWEB)

    1999-01-01

    This conference report comprises 16 papers on fuel cells. Subjects: Funds for fuel cell technology provided by the 4. programme for energy research and energy technologies; Funds provided by the European Commission for demonstration projects; Fuel cells: Stationary applications in power supply; Liberalisation of the energy markets - effects on fuel cell development; Fuel cell technology from a utility's point of view; PEMFC membrane fuel cells; PFC in domestic energy supply; Applications of PEMFC in stationary power generation; Development of a fuel cell drive; Comparative evaluations of passenger car drives with fuel cells and internal combustion engines; Economic aspects of PAFC fuel cells; Development of the carbonate fuel cell (MCFC); Demonstration plant at Santa Clara (MCFC); Development, demonstration and application of oxide ceramics fuel cells SOFC, Experience with SOFC. Four contributions are available as separate records in this database.

  12. Using quartz sand to enhance the removal efficiency of M. aeruginosa by inorganic coagulant and achieve satisfactory settling efficiency.

    Science.gov (United States)

    Pei, Haiyan; Jin, Yan; Xu, Hangzhou; Ma, Chunxia; Sun, Jiongming; Li, Hongmin

    2017-10-19

    In this study, low-cost and non-polluting quartz sand was respectively mixed with AlCl 3 , FeCl 3 and PAFC to synergistically remove Microcystis aeruginosa. Results showed that quartz sand could markedly increase the algae removal efficiency and decrease the coagulant doses. The increase of removal efficiency with AlCl 3 and FeCl 3 was only due to the enhancement of floc density by the quartz sand. However, the removal efficiency with PAFC was increased not only by the enhanced floc density, but also by the enlarged floc size. Flocs from 50 mg/L sand addition were larger than that with other sand doses, which was on account of the appropriate enhancement of collision efficiency at this dose. After coagulation, the extracellular organic matter (EOM) and microcystins (MCs) in system with quartz sand was remarkably reduced. That's because quartz sand can enhance the coagulation so as to improve capping the EOM and MCs in flocs during coagulation process. Owing to 200 mg/L quartz sand could damage the cell's membrane during coagulation proces, algal cells in the system lysed two days earlier than with 50 mg/L sand during flocs storage. In addition, cells with PAFC incurred relatively moderate cellular oxidative damage and could remain intact for longer time.

  13. Preliminary report on the utilization of the Fermilab site for a future accelerator

    International Nuclear Information System (INIS)

    1996-10-01

    This report is a preliminary assessment of the utility of the Fermilab site for future accelerator projects. It responds to a request from the Director to evaluate how the Fermilab site and infrastructure may be relevant to future accelerator projects in the U.S. The SSC experience suggests that any major new project will have to be based on the existing infrastructure at one of the National Laboratories. This work presents only the technical issues and the benefits of the Fermilab site and infrastructure. The projects treated are: (1) A really large hadron collider based on the ''Pipetron'' vision of low-field (2 Tesla) magnets in a small diameter tunnel. Another option, not treated in detail, is a hadron collider using high field magnets. (2) Muon Colliders with 250 GeV and 2 TeV per beam. (3) A linear electron collider with 250 to 500 GeV per beam. The infrastructure of the state of Illinois - geology, hydrology, power and surface water- seems remarkably well suited to any of these projects. The geology of most of Illinois, including Fermilab, contains a dolomite layer that: has low seismic activity, is at an appropriate depth to provide radiation protection, is essentially impervious to water movement and thus satisfies hydrology requirements. There is adequate electrical power - both locally and statewide. We first give brief overviews of the Fermilab and Illinois infrastructure - geology, hydrology, power, and water - and then a summary of each project. On the basis of what we have learned, we feel that Fermilab must be considered seriously as a site for any of these projects. Beyond this point, however site-specific plans will need to be developed for each of the projects

  14. Principle and methodology of nuclear power plant site selection. Application to radiocobalt cycle in the Rhone river

    International Nuclear Information System (INIS)

    Georges, J.

    1987-01-01

    In a first bibliographic part, after some generalities on radioactivity and nuclear power, general principles of radiation protection and national and international regulations are presented. The methodology of the radioecological study involved in site selection is developed. In a second more experimental part, the processing of radiocobalt gamma radioactivity measurement in water, fishes, plants and Rhone river sediments demonstrates the influence of age and geographical situation of the nuclear power stations located along the river. A laboratory experiment of cobalt 60 transfer from chironomes larvae to carp is carried out. Comparison with the results of other laboratory experiments makes it possible to propose an experimental model of cobalt transfer within a fresh water ecosystem; radioactivity levels calculated for various compartments seem to be consistent with the Rhone river levels [fr

  15. From a landfill to a power plant...,a tricky site reconversion

    International Nuclear Information System (INIS)

    Houot, G.

    2014-01-01

    Solar farms are necessary to assure a quick development of solar energy but they have to avoid conflicts with farmers and local populations. A consensual solution is to turn degraded sites like former landfills into solar farms but it is not so easy as expected. The rehabilitation of ancient landfills may require decontamination works, the reinforcement of the soil to support the arrays of solar panels and in any case it must be proved that the release of dump gases is compatible with the equipment of the solar farm. Feedback experience shows that the economic competitiveness of the project is assured if the landfill area is at least of 10 hectares and if the output power of the plant is important enough. (A.C.)

  16. Evolution of coal ash solidification properties with disposal site depth and age, 'Gacko' Thermal power plant case

    Directory of Open Access Journals (Sweden)

    Knežević Dinko

    2017-01-01

    Full Text Available Ash with high calcium content is produced by coal combusting in 'Gacko' thermal power plant (Bosnia and Herzegovina. Result of controlled mixture of water and ash is spontaneous ash solidification on disposal site. Speed and solidification efficiency depends on content of calcium-oxide in ash and water: ash mass ratio, which was determined by previous research. Mass ratio that was chosen as the most suitable ratio for industrial usage (roughly was 1:1. Samples of ash of different age were taken after 6.5 years of exploitation and their chemical, physical, mineralogical and geotechnical characteristics were analyzed. Disposed ash was stratified and very heterogeneous. It was shown that great impact on solidification process in practice have climate conditions, proper handling slurry processing, work continuity and disposal site preparation. Great impact of water is noticed which is, because of its water permeability filtrated into lower layers and significantly alters it characteristic.

  17. FY 2000 report on the demonstrative research for photovoltaic power generation system in Thailand. Demonstrative study on photovoltaic power generation grid-connected system

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-09-01

    In relation to the demonstrative study of the photovoltaic power system that is planned in Libong island, Thailand, the FY 2000 results were reported. In this R and D, construction/demonstrative operation were planned for a photovoltaic power station with a generation output of 100kW, photovoltaic power system in school facilities, and system for transmitting/distributing power to houses by connecting the power station and power system. In this fiscal year, the field survey was conducted together with the alteration from Yao Yai island, for which the demonstrative study was planned at first, to Libong island. The electric equipment was selected which met the requests from Thailand and the results of the field survey, and the basic design of the photovoltaic power generation/transmission/distribution system was completed. Based on this, the design/manufacture of photovoltaic power generation modules, power control equipment, measuring equipment, etc. were made. At the construction site of photovoltaic power station, construction work such as land formation was conducted. Further, Thai engineers who visited Japan did the following: discussions about power system, presence at test/inspection of photovoltaic power generation modules, visits to photovoltaic power stations, wind power stations, etc. (NEDO)

  18. A technical learning on the Pressurized Water Nuclear Power Plants using animation

    International Nuclear Information System (INIS)

    Ito, Hajime; Tomohara, Yasutaka; Kubo, Setsuo; Ninomiya, Toshiaki

    2002-01-01

    The pressurized water nuclear power generation plants tends to reduce construction of its new plant from viewpoints of recent stabilization in power demand/supply balance, development of new siting points, and so on. And, together with reducing any opportunity to experience at site, generation alternation to younger engineers without such experiences is progressing. In order to carry out technical tradition with high quality , as it is important to understand experiences of troubles and so on as valuable inheritance to apply them to actual use, it can be thought, in doubt, to be one of solving measures to prepare some learning tools applying the newest technology. The Kansai Electric Co., Ltd. Developed a CAD software using animation and 3D pictures using a personal computer which is edited some processes of technical transition on nuclear energy as a reference on a shape of CD ROM as an object from initial period of nuclear power station to present APWR. (G.K.)

  19. Improving regulatory effectiveness in Federal/State siting actions: Federal/State regulatory permitting actions in selected nuclear power station licensing cases

    International Nuclear Information System (INIS)

    Baroff, J.

    1977-06-01

    The Federal/State regulatory permitting actions in 12 case histories of nuclear power station licensing in nine different states are documented. General observations regarding Federal/State siting roles in the siting process are included. Eleven of the case histories are illustrated with a logic network that gives the actions of the utilities in addition to the Federal/State permits

  20. International Symposium on Site Characterization for CO2Geological Storage

    Energy Technology Data Exchange (ETDEWEB)

    Tsang, Chin-Fu

    2006-02-23

    Several technological options have been proposed to stabilize atmospheric concentrations of CO{sub 2}. One proposed remedy is to separate and capture CO{sub 2} from fossil-fuel power plants and other stationary industrial sources and to inject the CO{sub 2} into deep subsurface formations for long-term storage and sequestration. Characterization of geologic formations for sequestration of large quantities of CO{sub 2} needs to be carefully considered to ensure that sites are suitable for long-term storage and that there will be no adverse impacts to human health or the environment. The Intergovernmental Panel on Climate Change (IPCC) Special Report on Carbon Dioxide Capture and Storage (Final Draft, October 2005) states that ''Site characterization, selection and performance prediction are crucial for successful geological storage. Before selecting a site, the geological setting must be characterized to determine if the overlying cap rock will provide an effective seal, if there is a sufficiently voluminous and permeable storage formation, and whether any abandoned or active wells will compromise the integrity of the seal. Moreover, the availability of good site characterization data is critical for the reliability of models''. This International Symposium on Site Characterization for CO{sub 2} Geological Storage (CO2SC) addresses the particular issue of site characterization and site selection related to the geologic storage of carbon dioxide. Presentations and discussions cover the various aspects associated with characterization and selection of potential CO{sub 2} storage sites, with emphasis on advances in process understanding, development of measurement methods, identification of key site features and parameters, site characterization strategies, and case studies.