  1. Measurement plan and observational construction program on drift excavation at the Horonobe Underground Research Laboratory project

    International Nuclear Information System (INIS)

    Yamasaki, Masanao; Yamaguchi, Takehiro; Funaki, Hironori; Fujikawa, Daisuke; Tsusaka, Kimikazu

    2008-09-01

    The Horonobe URL Project is being pursued by the Japan Atomic Energy Agency (JAEA) to enhance the reliability of relevant disposal technologies through investigations of the deep geological environment within the host sedimentary formations at Horonobe, northern Hokkaido. The project consists of two major research areas, 'Geoscientific Research' and 'R and D' on Geological Disposal', and proceeds in three overlapping phases, 'Phase I: Surface-based investigation', 'Phase II: Construction' and 'Phase III: Operation', over a period of 20 years. On the Horonobe URL Project, 'Phase 1' was finished in 2005FY and construction of the underground facility was started since then. Now, 'Phase 2' (investigations during construction of the underground facilities) is on-going. On the 'Development of engineering techniques for use in the deep underground environment' in Phase 1, based on the various types of data acquired on investigations from the surface, the design of underground facility in advance was planned. At the inception of the Phase II investigations, an investigation report titled 'Measurement Plan and Observational Construction Program on Shaft Excavation at the Horonobe URL Project' (hereinafter referred to as 'Observational Construction Program') was published. The Observational Construction Program summarizes followings from the Phase I investigations: measurements for safety/reasonable construction, measurements for R and D on enhancement of shaft design/construction technology, and measurements for verification of the deep geological environment model estimated before shaft excavation, and it is on-going. This report summarizes the measurement plan during construction of drifts based on the design in advance and the observational construction program for feedback measurements data into design and construction on subsequent steps. This report also describes about design and construction management program of underground facility and R and D program on

  2. Construction program management

    CERN Document Server

    Delaney, Joseph

    2013-01-01

    Although construction is one of the largest industries in the United States, it lags behind other industries in its implementation of modern management techniques such as those contained in the Standard for Program Management (the Standard) by the Project Management Institute (PMI(R)). Construction Program Management details the successful use of the PMI(R) approach for the construction of capital programs. It demonstrates, through case studies, how implementation of PMI's set of tools and techniques can improve the chances of program success. Exploring tactical and strategic management method

  3. Automatic Construction of Java Programs from Functional Program Specifications

    OpenAIRE

    Md. Humayun Kabir

    2015-01-01

    This paper presents a novel approach to construct Java programs automatically from the input functional program specifications on natural numbers from the constructive proofs of the input specifications using an inductive theorem prover called Poiti'n. The construction of a Java program from the input functional program specification involves two phases. The theorem prover is used to construct a higher order functional (HOF) program from the input specification expressed as an existential the...

  4. Language constructs for modular parallel programs

    Energy Technology Data Exchange (ETDEWEB)

    Foster, I.

    1996-03-01

    We describe programming language constructs that facilitate the application of modular design techniques in parallel programming. These constructs allow us to isolate resource management and processor scheduling decisions from the specification of individual modules, which can themselves encapsulate design decisions concerned with concurrence, communication, process mapping, and data distribution. This approach permits development of libraries of reusable parallel program components and the reuse of these components in different contexts. In particular, alternative mapping strategies can be explored without modifying other aspects of program logic. We describe how these constructs are incorporated in two practical parallel programming languages, PCN and Fortran M. Compilers have been developed for both languages, allowing experimentation in substantial applications.

  5. Constructs for Programming with Graph Rewrites

    OpenAIRE

    Rodgers, Peter

    2000-01-01

    Graph rewriting is becoming increasingly popular as a method for programming with graph based data structures. We present several modifications to a basic serial graph rewriting paradigm and discuss how they improve coding programs in the Grrr graph rewriting programming language. The constructs we present are once only nodes, attractor nodes and single match rewrites. We illustrate the operation of the constructs by example. The advantages of adding these new rewrite modifiers is to reduce t...

  6. Construction safety program for the National Ignition Facility

    International Nuclear Information System (INIS)

    Cerruti, S.J.

    1997-01-01

    The Construction Safety Program (CSP) for NIF sets forth the responsibilities, guidelines, rules, policies and regulations for all workers involved in the construction, special equipment installation, acceptance testing, and initial activation and operation of NIF at LLNL during the construction period of NIF. During this period, all workers are required to implement measures to create a universal awareness which promotes safe practice at the work site, and which will achieve NIF's management objectives in preventing accidents and illnesses. Construction safety for NIF is predicated on everyone performing their jobs in a manner which prevents job-related disabling injuries and illnesses. The CSP outlines the minimum environment, safety, and health (ES ampersand H) standards, LLNL policies and the Construction Industry Institute (CII) Zero Injury Techniques requirements that all workers at the NIF construction site shall adhere to during the construction period of NIF. It identifies the safety requirements which the NIF organizational Elements, construction contractors and construction subcontractors must include in their safety plans for the construction period of NIF, and presents safety protocols and guidelines which workers shall follow to assure a safe and healthful work environment. The CSP also identifies the ES ampersand H responsibilities of LLNL employees, non-LLNL employees, construction contractors, construction subcontractors, and various levels of management within the NIF Program at LLNL. In addition, the CSP contains the responsibilities and functions of ES ampersand H support organizations and administrative groups, and describes their interactions with the NIF Program

  7. Construction safety program for the National Ignition Facility

    Energy Technology Data Exchange (ETDEWEB)

    Cerruti, S.J.

    1997-01-01

    The Construction Safety Program (CSP) for NIF sets forth the responsibilities, guidelines, rules, policies and regulations for all workers involved in the construction, special equipment installation, acceptance testing, and initial activation and operation of NIF at LLNL during the construction period of NIF. During this period, all workers are required to implement measures to create a universal awareness which promotes safe practice at the work site, and which will achieve NIF`s management objectives in preventing accidents and illnesses. Construction safety for NIF is predicated on everyone performing their jobs in a manner which prevents job-related disabling injuries and illnesses. The CSP outlines the minimum environment, safety, and health (ES&H) standards, LLNL policies and the Construction Industry Institute (CII) Zero Injury Techniques requirements that all workers at the NIF construction site shall adhere to during the construction period of NIF. It identifies the safety requirements which the NIF organizational Elements, construction contractors and construction subcontractors must include in their safety plans for the construction period of NIF, and presents safety protocols and guidelines which workers shall follow to assure a safe and healthful work environment. The CSP also identifies the ES&H responsibilities of LLNL employees, non-LLNL employees, construction contractors, construction subcontractors, and various levels of management within the NIF Program at LLNL. In addition, the CSP contains the responsibilities and functions of ES&H support organizations and administrative groups, and describes their interactions with the NIF Program.

  8. FELIX construction status and experimental program

    International Nuclear Information System (INIS)

    Turner, L.R.; Praeg, W.F.; Knott, M.J.; Lari, R.J.; McGhee, D.G.; Wehrle, R.B.

    1983-01-01

    FELIX (Fusion Electromagnetic Induction Experiment) is an experimental test facility being constructed at Argonne National Laboratory (ANL) for the study of electromagnetic effects in the first wall/blanket/shield (FWBS) systems of fusion reactors. The facility design, construction status, experimental program, instrumentation, and associated computer-code comparisons are described

  9. FELIX construction status and experimental program

    International Nuclear Information System (INIS)

    Turner, L.R.; Peag, W.F.

    1983-01-01

    FELIX (Fusion Electromagnetic Induction eXperiment) is an experimental test facility being constructed at Argonne National Laboratory (ANL) for the study of electromagnetic effects in the first wall/blanket/shield (FWBS) systems of fusion reactors. The facility design, construction status, experimental program, instrumentation, and associated computer-code comparisons are described

  10. Optimization of the annual construction program solutions

    Directory of Open Access Journals (Sweden)

    Oleinik Pavel

    2017-01-01

    Full Text Available The article considers potentially possible optimization solutions in scheduling while forming the annual production programs of the construction complex organizations. The optimization instrument is represented as a two-component system. As a fundamentally new approach in the first block of the annual program solutions, the authors propose to use a scientifically grounded methodology for determining the scope of work permissible for the transfer to a subcontractor without risk of General Contractor’s management control losing over the construction site. For this purpose, a special indicator is introduced that characterizes the activity of the general construction organization - the coefficient of construction production management. In the second block, the principal methods for the formation of calendar plans for the fulfillment of the critical work effort by the leading stream are proposed, depending on the intensity characteristic.

  11. Construction safety program for the National Ignition Facility

    Energy Technology Data Exchange (ETDEWEB)

    Cerruti, S.J.

    1997-06-26

    The Construction Safety Program (CSP) for NIF sets forth the responsibilities, guidelines, rules, policies and regulations for all workers involved in the construction, special equipment installation, acceptance testing, and initial activation and operation of NIF at LLNL during the construction period of NIF.

  12. Construction safety program for the National Ignition Facility

    International Nuclear Information System (INIS)

    Cerruti, S.J.

    1997-01-01

    The Construction Safety Program (CSP) for NIF sets forth the responsibilities, guidelines, rules, policies and regulations for all workers involved in the construction, special equipment installation, acceptance testing, and initial activation and operation of NIF at LLNL during the construction period of NIF

  13. Construction and Verification of PLC LD-programs by LTL-specification

    Directory of Open Access Journals (Sweden)

    E. V. Kuzmin

    2013-01-01

    Full Text Available An approach to construction and verification of PLC LD-programs for discrete problems is proposed. For the specification of the program behavior, we use the linear-time temporal logic LTL. Programming is carried out in the LD-language (Ladder Diagram according to an LTL-specification. The correctness analysis of an LTL-specification is carried out by the symbolic model checking tool Cadence SMV. A new approach to programming and verification of PLC LD-programs is shown by an example. For a discrete problem, we give a LD-program, its LTL-specification and an SMV-model. The purpose of the article is to describe an approach to programming PLC, which would provide a possibility of LD-program correctness analysis by the model checking method. Under the proposed approach, the change of the value of each program variable is described by a pair of LTL-formulas. The first LTL-formula describes situations which increase the value of the corresponding variable, the second LTL-formula specifies conditions leading to a decrease of the variable value. The LTL-formulas (used for speci- fication of the corresponding variable behavior are constructive in the sense that they construct the PLC-program (LD-program, which satisfies temporal properties expressed by these formulas. Thus, the programming of PLC is reduced to the construction of LTLspecification of the behavior of each program variable. In addition, an SMV-model of a PLC LD-program is constructed according to LTL-specification. Then, the SMV-model is analysed by the symbolic model checking tool Cadence SMV.

  14. The NIOSH Construction Program: research to practice, impact, and developing a National Construction Agenda.

    Science.gov (United States)

    Gillen, Matt

    2010-06-01

    The U.S. National Institute for Occupational Safety and Health (NIOSH) conducts research to improve and protect the health and safety of workers. This paper describes the experience of the NIOSH Construction Program with two recent program planning initiatives intended to improve the program: (a) an independent external review of work over the past decade and (b) the development of strategic goals organized into a "National Construction Agenda" to guide a decade of future work. These goals, developed with input from construction industry stakeholders and researchers, are a part of the NIOSH National Occupational Research Agenda (NORA) initiative. The NORA goals are intended to provide an ambitious set of goals for all construction stakeholders to work together on. Both efforts relate to insuring the relevance and impact of research, reflecting an emerging policy perspective that research programs should be judged not just by the quality and quantity of science produced, but by the industry impact and tangible benefit resulting from the research. This paper describes how views on research planning have evolved to incorporate lessons learned about how research leads to improved safety and health for workers. It also describes the process used to develop the goals and the resulting strategic and intermediate goals that comprise the National Construction Agenda. (c) 2010 Elsevier Ltd. All rights reserved.

  15. On Construction and Verification of PLC-Programs

    Directory of Open Access Journals (Sweden)

    E. V. Kuzmin

    2012-01-01

    Full Text Available We review some methods and approaches to programming discrete problems for Programmable Logic Controllers on the example of constructing PLC-programs for controling a code lock. For these approaches we evaluate the usability of the model checking method for the analysis of program correctness with respect to the automatic verification tool Cadence SMV. Some possible PLC-program vulnerabilities arising at a number approaches to programming of PLC are revealed.

  16. Identifying the Critical Factors Affecting Safety Program Performance for Construction Projects within Pakistan Construction Industry

    Directory of Open Access Journals (Sweden)

    Zubair Ahmed Memon

    2013-04-01

    Full Text Available Many studies have shown that the construction industry one of the most hazardous industries with its high rates of fatalities and injuries and high financial losses incurred through work related accident. To reduce or overcome the safety issues on construction sites, different safety programs are introduced by construction firms. A questionnaire survey study was conducted to highlight the influence of the Construction Safety Factors on safety program implementation. The input from the questionnaire survey was analyzed by using AIM (Average Index Method and rank correlation test was conducted between different groups of respondents to measure the association between different groups of respondent. The finding of this study highlighted that management support is the critical factor for implementing the safety program on projects. From statistical test, it is concluded that all respondent groups were strongly in the favor of management support factor as CSF (Critical Success Factor. The findings of this study were validated on selected case studies. Results of the case studies will help to know the effect of the factors on implementing safety programs during the execution stage.

  17. Simultaneous test construction by zero-one programming

    NARCIS (Netherlands)

    Boekkooi-Timminga, Ellen

    1986-01-01

    A method is described for simultaneous test construction using the Operations Research technique zero-one programming. The model for zero-one programming consists of two parts. The first contains the objective function that describes the aspect to be optimized. The second part contains the

  18. A Solid Foundation: Key Capacities of Construction Pre-Apprenticeship Programs

    Science.gov (United States)

    Helmer, Matt; Blair, Amy; Gerber, Allison

    2012-01-01

    This publication shares research from site visits conducted to construction pre-apprenticeship programs in Baltimore, Hartford, Milwaukee and Portland (OR). Findings from the site visits, which included interviews and focus groups with pre-apprenticeship program staff, public officials, philanthropic leaders, construction industry leaders and…

  19. Algorithms and programs for consequence diagram and fault tree construction

    International Nuclear Information System (INIS)

    Hollo, E.; Taylor, J.R.

    1976-12-01

    A presentation of algorithms and programs for consequence diagram and sequential fault tree construction that are intended for reliability and disturbance analysis of large systems. The system to be analyzed must be given as a block diagram formed by mini fault trees of individual system components. The programs were written in LISP programming language and run on a PDP8 computer with 8k words of storage. A description is given of the methods used and of the program construction and working. (author)

  20. Programming While Construction of Engineering 3D Models of Complex Geometry

    Science.gov (United States)

    Kheyfets, A. L.

    2017-11-01

    The capabilities of geometrically accurate computational 3D models construction with the use of programming are presented. The construction of models of an architectural arch and a glo-boid worm gear is considered as an example. The models are designed in the AutoCAD pack-age. Three programs of construction are given. The first program is for designing a multi-section architectural arch. The control of the arch’s geometry by impacting its main parameters is shown. The second program is for designing and studying the working surface of a globoid gear’s worm. The article shows how to make the animation for this surface’s formation. The third program is for formation of a worm gear cavity surface. The cavity formation dynamics is studied. The programs are written in the AutoLisp programming language. The program texts are provided.

  1. Gap Analysis Approach for Construction Safety Program Improvement

    Directory of Open Access Journals (Sweden)

    Thanet Aksorn

    2007-06-01

    Full Text Available To improve construction site safety, emphasis has been placed on the implementation of safety programs. In order to successfully gain from safety programs, factors that affect their improvement need to be studied. Sixteen critical success factors of safety programs were identified from safety literature, and these were validated by safety experts. This study was undertaken by surveying 70 respondents from medium- and large-scale construction projects. It explored the importance and the actual status of critical success factors (CSFs. Gap analysis was used to examine the differences between the importance of these CSFs and their actual status. This study found that the most critical problems characterized by the largest gaps were management support, appropriate supervision, sufficient resource allocation, teamwork, and effective enforcement. Raising these priority factors to satisfactory levels would lead to successful safety programs, thereby minimizing accidents.

  2. 42 CFR 137.275 - May Self-Governance Tribes include IHS construction programs in a construction project agreement...

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false May Self-Governance Tribes include IHS construction... OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Purpose and Scope § 137.275 May Self-Governance Tribes include IHS construction programs in a construction project agreement or in a funding...

  3. The SIRTF Legacy Observing Program

    Science.gov (United States)

    Greenhouse, M. A.; Leisawitz, D.; Gehrz, R. D.; Clemens, D. P.; Force, Sirtf Community Task

    1997-12-01

    Legacy Observations and General Observations(GO)are separate categories in which SIRTF observing time will be allocated through peer reviewed community proposals. The Legacy Program will embrace several projects, each headed by a Legacy Principal Investigator. Legacy Observations are distinguished from General Observations by the following three criteria: [1] the project is a large, coherent investigation whose scientific goals can not be met by a number of smaller, uncoordinated projects; [2] the data will be of both general and lasting importance to the broad astronomical community and of immediate utility in motivating and planning follow-on GO investigations with SIRTF; and [3] the data (unprocessed, fully processed, and at intermediate steps in processing) will be placed in a public data base immediately and with no proprietary period. The goals of the SIRTF Legacy program are: [1] enable community use of SIRTF for large coherent survey observations, [2] provide prompt community access to SIRTF survey data, and [3] enable GO program observations based on Legacy program results. A likely attribute (but not a requirement) for Legacy projects is that they may involve hundreds, and perhaps thousands, of hours of observing time. It is anticipated that as much as 6000 hours of telescope time will be allocated through the Legacy program. To meet Legacy program goal [3], allocation of as much as 70% of SIRTF's first year on orbit to Legacy projects may be necessary, and the observing phase of the Legacy program will be completed during the following year. A Legacy call for proposals will be issued 1 year prior to launch or sooner, and will be open to all scientists and science topics. In this poster, we display Legacy program definition and schedule items that will be of interest to those intending to propose under this unique opportunity.

  4. Construction Improvement for the Korean Nuclear Program

    International Nuclear Information System (INIS)

    Yang, T. E.

    1992-01-01

    Construction of the nine Nuclear plants requires an enormous financial investment. The decision to build a nuclear unit is based on both economic and resource requirements. Korea has few natural resources to use for power generation so the use of diversified fuel sources is a part of the planning process. Nuclear has historically had economic advantages over the fossil fueled plant, however, this advantage has been reduced. This is mainly due to increasing decommissioning and waste disposal costs plus the financial outlays associated with gaining public acceptance of new nuclear units. One of the principal means to recover the economic advantage of a nuclear plant is to shorten the time needed for construction. Every extra day of construction costs large sums of money in interest and escalation expenses alone. The challenge is to shorten the construction period to the minimum feasible time and thereby reduce the financing costs. The methods that have to be employed to achieve this goal require the total commitment from the management of all entities involved in the program. Through the application of advanced management and construction techniques a new era in the construction of nuclear plants in Korea will occur. This will include changes to the methods used for managing, planning, licensing, designing and constructing the new plants. The ability to meet the aggressive plan for the construction of new nuclear power plants in Korea rests in the hands of the managers of all the parties involved. These men set all the rules by which the new plants will be constructed. It is their responsibility to tackle the current problems and develop the solutions to enable the plan to be realized. The changes suggested within this paper are major, but the potential benefits will allow the Korean Nuclear Industry to advance into the twenty first Century as a leader. The number of fully trained specialists needed to make this happen will not appear overnight. They will have to be

  5. Important considerations related to the construction of observation wells in radiation facilities sites: A review research

    International Nuclear Information System (INIS)

    El-Sayed, S. A.; Salem, W. M.; Atta, E. R.

    2012-01-01

    Observation wells in radiation facility sites are considered the main sources of the required subsurface geologic and hydrogeologic data. They are the most important means to detect the radioactive and/or chemical contaminants within the ground water. Also, they are used to observe the groundwater level fluctuations and perform the different aquifer tests to understand the hydraulic properties of aquifers and the behavior of contaminants transportation. This research reviews the necessary considerations and available techniques for constructing the observation wells properly. The review process depends on the international guidelines presented in the literature and the field experience. The proper well completion is essential for the well efficiency and longevity. Three main important topics are considered and discussed briefly in this review. They are the preliminary considerations, the drilling program and the well protection procedures. The preliminary considerations included are the collection of the available geologic and hydrogeologic data and information, selection of drilling method and the legal requirements. The drilling program comprises the site preparation, drilling processes, sampling, well logging, well design, casing components and materials, gravel pack and well development. The well protection procedures include well grout, concrete slab and others requirements. Observation wells should be constructed to a high standard and should be properly maintained and protected to ensure ongoing and reliable data collection

  6. Construction of a patient observation system using KINECTTM

    International Nuclear Information System (INIS)

    Miyaura, Kazunori; Kumazaki, Yu; Kato, Shingo; Fukushima, Chika; Saitoh, Hidetoshi

    2014-01-01

    Improvement in the positional accuracy of irradiation is expected by capturing patient motion (intra-fractional error) during irradiation. The present study reports the construction of a patient observation system using Microsoft® KINECT TM . By tracking movement, we made it possible to add a depth component to the acquired position coordinates and to display three-axis (X, Y, and Z) movement. Moreover, the developed system can be displayed in a graph which is constructed from the coordinate position at each time interval. Using the developed system, an observer can easily visualize patient movement. When the body phantom was moved a known distance in the X, Y, and Z directions, good coincidence was shown with each axis. We built a patient observation system which captures a patient's motion using KINECT TM .

  7. A construction of observables for AKSZ sigma models

    OpenAIRE

    Mnev, Pavel

    2012-01-01

    A construction of gauge-invariant observables is suggested for a class of topological field theories, the AKSZ sigma-models. The observables are associated to extensions of the target Q-manifold of the sigma model to a Q-bundle over it with additional Hamiltonian structure in fibers.

  8. Process Evaluation of a Toolbox-training Program for Construction Foremen in Denmark

    DEFF Research Database (Denmark)

    Jeschke, Katharina Christiane; Kines, Pete; Rasmussen, Liselotte

    2017-01-01

    for the majority of the foremen, who experienced positive changes in their daily work methods and interactions with their crews, colleagues, leaders, customers and other construction professions. The program is a unique contribution to leadership training in the construction industry, and can potentially......Daily dialogue between leaders and workers on traditional construction sites is primarily focused on production, quality and time issues, and rarely involves occupational safety and health (OSH) issues. A leadership training program entitled 'Toolbox-training' was developed to improve construction...

  9. Development of a safety communication and recognition program for construction.

    Science.gov (United States)

    Sparer, Emily H; Herrick, Robert F; Dennerlein, Jack T

    2015-05-01

    Leading-indicator-based (e.g., hazard recognition) incentive programs provide an alternative to controversial lagging-indicator-based (e.g., injury rates) programs. We designed a leading-indicator-based safety communication and recognition program that incentivized safe working conditions. The program was piloted for two months on a commercial construction worksite and then redesigned using qualitative interview and focus group data from management and workers. We then ran the redesigned program for six months on the same worksite. Foremen received detailed weekly feedback from safety inspections, and posters displayed worksite and subcontractor safety scores. In the final program design, the whole site, not individual subcontractors, was the unit of analysis and recognition. This received high levels of acceptance from workers, who noted increased levels of site unity and team-building. This pilot program showed that construction workers value solidarity with others on site, demonstrating the importance of health and safety programs that engage all workers through a reliable and consistent communication infrastructure. © The Author(s) 2015 Reprints and permissions: sagepub.co.uk/journalsPermissions.nav.

  10. Loyalty Program in the Pharmacy. Case of Construction and Implementation

    Directory of Open Access Journals (Sweden)

    Agnieszka Woś

    2008-03-01

    Full Text Available This paper presents the process of construction the loyalty programs between pharmaceutical market that is shaped warehouse, pharmacy and patient. The examples of this loyalty programs in this article has confirm the opinion about programs as efficiency in the pharmaceutical environment in Poland.

  11. Name management in the construction of large programs. [Modular decomposition, programmed in PL/I for IBM 360/65

    Energy Technology Data Exchange (ETDEWEB)

    Carr, P.A.; Keller, R.F.; Wright, C.T. Jr.

    1976-08-01

    There has been much recent work on the problem of constructing large programs. One aspect of this problem that has been somewhat ignored is the management of names during the program construction process. A framework emphasizing this aspect of the problem is presented. Linguistic constructs for the manipulation of names between independently written pieces of text are defined. An implementation model defining the effect of these constructs on the naming structure of the resulting language is presented. The implementation model is demonstrated in terms of an example to illustrate the usefulness of the framework.

  12. Neural-network-observer-based optimal control for unknown nonlinear systems using adaptive dynamic programming

    Science.gov (United States)

    Liu, Derong; Huang, Yuzhu; Wang, Ding; Wei, Qinglai

    2013-09-01

    In this paper, an observer-based optimal control scheme is developed for unknown nonlinear systems using adaptive dynamic programming (ADP) algorithm. First, a neural-network (NN) observer is designed to estimate system states. Then, based on the observed states, a neuro-controller is constructed via ADP method to obtain the optimal control. In this design, two NN structures are used: a three-layer NN is used to construct the observer which can be applied to systems with higher degrees of nonlinearity and without a priori knowledge of system dynamics, and a critic NN is employed to approximate the value function. The optimal control law is computed using the critic NN and the observer NN. Uniform ultimate boundedness of the closed-loop system is guaranteed. The actor, critic, and observer structures are all implemented in real-time, continuously and simultaneously. Finally, simulation results are presented to demonstrate the effectiveness of the proposed control scheme.

  13. 48 CFR 252.225-7044 - Balance of Payments Program-Construction Material.

    Science.gov (United States)

    2010-10-01

    ... Program-Construction Material. 252.225-7044 Section 252.225-7044 Federal Acquisition Regulations System...—Construction Material. As prescribed in 225.7503(a), use the following clause: Balance of Payments Program—Construction Material (JAN 2009) (a) Definitions. As used in this clause— Commercially available off-the-shelf...

  14. Process evaluation of a Toolbox-training program for construction foremen in Denmark

    DEFF Research Database (Denmark)

    Jeschke, Katharina Christiane; Kines, Pete; Rasmussen, Liselotte

    2017-01-01

    foremen’s knowledge and communication skills in daily planning of work tasks and their related OSH risks on construction sites. The program builds on the popular 'toolbox meeting' concept, however there is very little research evaluating these types of meetings. This article describes the development...... and revised until the final version after the fifth group. The evaluation utilized an action research strategy with a mixed–methods approach of triangulating questionnaire, interview, and observation data. Process evaluation results showed that the eight Toolbox-training topics were relevant and useful...

  15. A worksite prevention program for construction workers: design of a randomized controlled trial.

    Science.gov (United States)

    Oude Hengel, Karen M; Joling, Catelijne I; Proper, Karin I; Blatter, Birgitte M; Bongers, Paulien M

    2010-06-14

    A worksite prevention program was developed to promote the work ability of construction workers and thereby prolong a healthy working life. The objective of this paper is to present the design of a randomized controlled trial evaluating the effectiveness of that intervention program compared with usual care for construction workers. The study is designed as a randomized controlled trial with a follow-up of one year. Employees eligible for this study are construction workers performing actual construction work. The worksite intervention will be compared with usual care. This intervention was developed by using the Intervention Mapping approach and consists of the following components: (1) two individual training sessions of a physical therapist to lower the physical workload, (2) a Rest-Break tool to improve the balance between work and recovery, and (3) two empowerment training sessions to increase the influence of the construction workers at the worksite. Outcome measures are assessed at baseline, 3, 6, and 12 months. The primary outcome measures of this study are work ability and health-related quality of life. Secondary outcome measures include need for recovery, musculoskeletal complaints, work engagement and self efficacy. Cost-effectiveness will be evaluated from the company perspective. Moreover, a process evaluation will be conducted. The feasibility of the intervention and the study has been enhanced by creating an intervention program that explicitly appeals to construction workers and will not interfere too much with the ongoing construction. The feasibility and effectiveness of this worksite prevention program will be investigated by means of an effect- and a process evaluation. If proven effective, this worksite prevention program can be implemented on a larger scale within the construction industry. NTR1278.

  16. A Toolchain to Produce Correct-by-Construction OCaml Programs

    OpenAIRE

    Filliâtre , Jean-Christophe; Gondelman , Léon; Paskevich , Andrei; Pereira , Mário; Melo De Sousa , Simão

    2018-01-01

    This paper presents a methodology to get correct-by-construction OCaml programs using the Why3 tool. First, a formal behavioral specification is given in the form of an OCaml module signature extended with type invariants and function contracts, in the spirit of JML. Second, an implementation is written in the programming language of Why3 and then verified with respect to the specification. Finally, an OCaml program is obtained by an automated translation. Our methodology is illustrated with ...

  17. A program for constructing finitely presented Lie algebras and superalgebras

    International Nuclear Information System (INIS)

    Gerdt, V.P.; Kornyak, V.V.

    1997-01-01

    The purpose of this paper is to describe a C program FPLSA for investigating finitely presented Lie algebras and superalgebras. The underlying algorithm is based on constructing the complete set of relations called also standard basis or Groebner basis of ideal of free Lie (super) algebra generated by the input set of relations. The program may be used, in particular, to compute the Lie (super)algebra basis elements and its structure constants, to classify the finitely presented algebras depending on the values of parameters in the relations, and to construct the Hilbert series. These problems are illustrated by examples. (orig.)

  18. 49 CFR 28.151 - Program accessibility: New construction and alterations.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Program accessibility: New construction and alterations. 28.151 Section 28.151 Transportation Office of the Secretary of Transportation ENFORCEMENT OF NONDISCRIMINATION ON THE BASIS OF HANDICAP IN PROGRAMS OR ACTIVITIES CONDUCTED BY THE DEPARTMENT OF TRANSPORTATION...

  19. A Method of Sample Models of Program Construction in Terms of Petri Nets

    Directory of Open Access Journals (Sweden)

    D. I. Kharitonov

    2015-01-01

    Full Text Available In the article a method of automated construction of Petri nets simulating the behaviour of imperative programs is considered from the formal point of view. Petri net samples with certain characteristics are necessary in programming new algorithms for program analysis; in particular, they can be used for developing or optimizing algorithms of Petri nets compositions and decompositions, building the reachability tree, checking invariants and so on. The generation process consists of two stages. At the first stage, construction templates for a resulting net and parameters for construction are described. With the help of these parameters it is possible to regulate the final size and the absolute or relative amount of certain structures in the resulting net. At the second stage, iterative process of automated net construction is used for Petri net generation of any size, limited only by an available computer memory. In the first section of the article the minimum necessary definitions are given and a new version of Petri nets composition operation by places is introduced. Commutative and associative properties of introduced binary operation allow to synchronize any number of Petri nets in arbitrary order. Then construction template is defined as a marked Petri net with input and output interfaces and rules for templates composition using this interfaces. A number of construction templates can be united in a collection, for which the evolution rules are defined. The completeness property of a collection guarantees that the collection evolution results in a Petri net that simulates the imperative program behavior. The article provides a version of the construction templates complete collection and an example of Petri net simulating sequential imperative program construction.

  20. A worksite prevention program for construction workers: design of a randomized controlled trial

    Directory of Open Access Journals (Sweden)

    Proper Karin I

    2010-06-01

    Full Text Available Abstract Background A worksite prevention program was developed to promote the work ability of construction workers and thereby prolong a healthy working life. The objective of this paper is to present the design of a randomized controlled trial evaluating the effectiveness of that intervention program compared with usual care for construction workers. Methods The study is designed as a randomized controlled trial with a follow-up of one year. Employees eligible for this study are construction workers performing actual construction work. The worksite intervention will be compared with usual care. This intervention was developed by using the Intervention Mapping approach and consists of the following components: (1 two individual training sessions of a physical therapist to lower the physical workload, (2 a Rest-Break tool to improve the balance between work and recovery, and (3 two empowerment training sessions to increase the influence of the construction workers at the worksite. Outcome measures are assessed at baseline, 3, 6, and 12 months. The primary outcome measures of this study are work ability and health-related quality of life. Secondary outcome measures include need for recovery, musculoskeletal complaints, work engagement and self efficacy. Cost-effectiveness will be evaluated from the company perspective. Moreover, a process evaluation will be conducted. Discussion The feasibility of the intervention and the study has been enhanced by creating an intervention program that explicitly appeals to construction workers and will not interfere too much with the ongoing construction. The feasibility and effectiveness of this worksite prevention program will be investigated by means of an effect- and a process evaluation. If proven effective, this worksite prevention program can be implemented on a larger scale within the construction industry. Trial Registration NTR1278

  1. ROW (Right-of-Way) interfering construction activities management program

    Energy Technology Data Exchange (ETDEWEB)

    Rosito, Roberta; Oliveira, Marisa; Lima, Shirley [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil)

    2009-07-01

    A significant portion of pipeline failures occurs due to external damage. This includes third party right of way (ROW) encroachment, which shall be identified and avoided. However, injuries caused by known and planned activities do happen. Construction of crossing or sharing ROW pipelines, crossing roads and bridges, neighboring buildings and excavations of any kind might put existing pipelines in risk. This paper presents how the TRANSPETRO ROW Interfering Construction Activities Management Program is implemented by a regional ROW maintenance department responsible for more than 3,000 km of pipelines, mostly in Rio de Janeiro and Minas Gerais states. This program is based on a TRANSPETRO procedure that was written after the publication of the Official Order number 125 of ANP (Oil, Gas and Biofuel Brazilian National Agency). Tasks from design review and approval to field construction supervision are performed by the staff responsible for the routine patrols and maintenance management. The ability of foreseeing risky activities is improved by expertise gained from day-to-day work on site. (author)

  2. Application of MCM image construction to IRAS comet observations

    Science.gov (United States)

    Schlapfer, Martin F.; Walker, Russell G.

    1994-01-01

    There is a wealth of IRAS comet data, obtained in both the survey and pointed observations modes. However, these measurements have remained largely untouched due to difficulties in removing instrumental effects from the data. We have developed a version of the Maximum Correlation Method for Image Construction algorithm (MCM) which operates in the moving coordinate system of the comet and properly treats both real cometary motion and apparent motion due to spacecraft parallax. This algorithm has been implemented on a 486/33 PC in FORTRAN and IDL codes. Preprocessing of the IRAS CRDD includes baseline removal, deglitching, and removal of long tails due to dielectric time constants of the detectors. The resulting images are virtually free from instrumental effects and have the highest possible spatial resolution consistent with the data sampling. We present examples of high resolution IRAS images constructed from survey observations of Comets P/Tempel 1 and P/Tempel 2, and pointed observations of IRAS-Araki-Alcock.

  3. Economic efficiency of high-rise construction in the Moscow program of renovation of housing stock

    Science.gov (United States)

    Misailovov, Andrey

    2018-03-01

    The article considers a new initiative of the regional authorities of updating the housing stock designated as the renovation of housing. Its main aspects are analyzed, including the nature of program, economic efficiency of its implementation due to high-rise construction and the regulatory and legislative framework, the procedure for implementing the program, and the time frame for its implementation. The role of the program for regions in which high depreciation of the housing stock is combined with a limited number of sites for a new housing construction is disclosed. The high-rise construction in the renovation program is presented as a variant of a successful solution not only of the tasks of renovating the housing stock, but also of filling the regional budget. The social and economic orientation of the high-rise construction and the involvement of residents in the process of making town-planning decisions in the field of high-rise construction at all stages of implementing the program are shown.

  4. The NRAO Observing for University Classes Program

    Science.gov (United States)

    Cannon, John M.; Van Moorsel, Gustaaf A.

    2017-01-01

    The NRAO "Observing for University Classes" program is a tremendous resource for instructors of courses in observational astronomy. As a service to the astronomical and educational communities, the NRAO offers small amounts of observing time on the Very Large Array (VLA) and the Very Long Baseline Array to such instructors. The data can be used by students and faculty to demonstrate radio astronomy theory with modern data products. Further, the results may lead to publication; this is a unique opportunity for faculty members to integrate research into the classroom. Previous experience with NRAO facilities is required for instructors; individuals without radio astronomy experience can take advantage of other NRAO educational opportunities (e.g., the Synthesis Imaging Workshop) prior to using the program. No previous experience with radio astronomy data is required for students; this is the primary target audience of the program. To demonstrate concept, this poster describes three different VLA observing programs that have been completed using the "Observing for University Classes" resource at Macalester College; undergraduate students have published the results of all three of these programs. Other recent "Observing for University Classes" programs are also described.

  5. 12 CFR 410.151 - Program accessibility: New construction and alterations.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 4 2010-01-01 2010-01-01 false Program accessibility: New construction and alterations. 410.151 Section 410.151 Banks and Banking EXPORT-IMPORT BANK OF THE UNITED STATES ENFORCEMENT OF NONDISCRIMINATION ON THE BASIS OF HANDICAP IN PROGRAMS OR ACTIVITIES CONDUCTED BY EXPORT-IMPORT BANK OF THE UNITED...

  6. 50 CFR 222.404 - Observer program sampling.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 7 2010-10-01 2010-10-01 false Observer program sampling. 222.404 Section 222.404 Wildlife and Fisheries NATIONAL MARINE FISHERIES SERVICE, NATIONAL OCEANIC AND ATMOSPHERIC... Requirement § 222.404 Observer program sampling. (a) During the program design, NMFS would be guided by the...

  7. Model for behavior observation training programs

    International Nuclear Information System (INIS)

    Berghausen, P.E. Jr.

    1987-01-01

    Continued behavior observation is mandated by ANSI/ANS 3.3. This paper presents a model for behavior observation training that is in accordance with this standard and the recommendations contained in US NRC publications. The model includes seventeen major topics or activities. Ten of these are discussed: Pretesting of supervisor's knowledge of behavior observation requirements, explanation of the goals of behavior observation programs, why behavior observation training programs are needed (legal and psychological issues), early indicators of emotional instability, use of videotaped interviews to demonstrate significant psychopathology, practice recording behaviors, what to do when unusual behaviors are observed, supervisor rationalizations for noncompliance, when to be especially vigilant, and prevention of emotional instability

  8. RECOMMENDED FOUNDATION FILL MATERIALS CONSTRUCTION STANDARD OF THE FLORIDA RADON RESEARCH PROGRAM

    Science.gov (United States)

    The report summarizes the technical basis for a recommended foundation fill materials standard for new construction houses in Florida. he radon-control construction standard was developed by the Florida Radon Research Program (FRRP). ill material standards are formulated for: (1)...

  9. Financial Awareness Education with Apprentices in the Australian Construction Industry: Program Evaluation

    Science.gov (United States)

    Du Plessis, Karin; Green, Emma

    2013-01-01

    A financial awareness education program was implemented with construction industry apprentices in Victoria, Australia. The program included face-to-face delivery of education around a range of financial management issues that apprentices face as they begin their apprenticeship. The paper reports on an evaluation of the program, which included…

  10. At-Sea Hake Observer Program (ASHOP) Dataset - West Coast Groundfish Observer Program and At-Sea Hake Observer Program data collection, analysis and reporting

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Observer programs are the most comprehensive fishery dependent data collection system for total mortality estimation, protected species monitoring and discard data...

  11. An Environmental Management Maturity Model of Construction Programs Using the AHP-Entropy Approach

    Directory of Open Access Journals (Sweden)

    Libiao Bai

    2018-06-01

    Full Text Available The accelerating process of urbanization in China has led to considerable opportunities for the development of construction projects, however, environmental issues have become an important constraint on the implementation of these projects. To quantitatively describe the environmental management capabilities of such projects, this paper proposes a 2-dimensional Environmental Management Maturity Model of Construction Program (EMMMCP based on an analysis of existing projects, group management theory and a management maturity model. In this model, a synergetic process was included to compensate for the lack of consideration of synergies in previous studies, and it was involved in the construction of the first dimension, i.e., the environmental management index system. The second dimension, i.e., the maturity level of environment management, was then constructed by redefining the hierarchical characteristics of construction program (CP environmental management maturity. Additionally, a mathematical solution to this proposed model was derived via the Analytic Hierarchy Process (AHP-entropy approach. To verify the effectiveness and feasibility of this proposed model, a computational experiment was conducted, and the results show that this approach could not only measure the individual levels of different processes, but also achieve the most important objective of providing a reference for stakeholders when making decisions on the environmental management of construction program, which reflects this model is reasonable for evaluating the level of environmental management maturity in CP. To our knowledge, this paper is the first study to evaluate the environmental management maturity levels of CP, which would fill the gap between project program management and environmental management and provide a reference for relevant management personnel to enhance their environmental management capabilities.

  12. Korea Earth Observation Satellite Program

    Science.gov (United States)

    Baek, Myung-Jin; Kim, Zeen-Chul

    via Korea Aerospace Research Institute (KARI) as the prime contractor in the area of Korea earth observation satellite program to enhance Korea's space program development capability. In this paper, Korea's on-going and future earth observation satellite programs are introduced: KOMPSAT- 1 (Korea Multi Purpose Satellite-1), KOMPSAT-2 and Communication, Broadcasting and Meteorological Satellite (CBMS) program. KOMPSAT-1 satellite successfully launched in December 1999 with Taurus launch vehicle. Since launch, KOMPSAT-1 is downlinking images of Korea Peninsular every day. Until now, KOMPSAT-1 has been operated more than 2 and half years without any major hardware malfunction for the mission operation. KOMPSAT-1 payload has 6.6m panchromatic spatial resolution at 685 km on-orbit and the spacecraft bus had NASA TOMS-EP (Total Ozone Mapping Spectrometer-Earth Probe) spacecraft bus heritage designed and built by TRW, U.S.A.KOMPSAT-1 program was international co-development program between KARI and TRW funded by Korean Government. be launched in 2004. Main mission objective is to provide geo-information products based on the multi-spectral high resolution sensor called Multi-Spectral Camera (MSC) which will provide 1m panchromatic and 4m multi-spectral high resolution images. ELOP of Israel is the prime contractor of the MSC payload system and KARI is the total system prime contractor including spacecraft bus development and ground segment. KARI also has the contract with Astrium of Europe for the purpose of technical consultation and hardware procurement. Based on the experience throughout KOMPSAT-1 and KOMPSAT-2 space system development, Korea is expecting to establish the infrastructure of developing satellite system. Currently, KOMPSAT-2 program is in the critical design stage. are scheduled to launch in 2008 and in 2014, respectively. The mission of CBMS consists of two areas. One is of space technology test for the communications mission, and the other is of a real

  13. Observer Logistics (OBSLOG) - West Coast Groundfish Observer Program and At-Sea Hake Observer Program data collection, analysis and reporting

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Observer programs are the most comprehensive fishery dependent data collection system for total mortality estimation, protected species monitoring and discard data...

  14. Observer Production (OBSPROD) - West Coast Groundfish Observer Program and At-Sea Hake Observer Program data collection, analysis and reporting

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Observer programs are the most comprehensive fishery dependent data collection system for total mortality estimation, protected species monitoring and discard data...

  15. Utility residential new construction programs: Going beyond the code. A report from the Database on Energy Efficiency Programs (DEEP) Project

    Energy Technology Data Exchange (ETDEWEB)

    Vine, E.

    1995-08-01

    Based on an evaluation of 10 residential new construction programs, primarily sponsored by investor-owned utilities in the United States, we find that many of these programs are in dire straits and are in danger of being discontinued because current inclusion of only direct program effects leads to the conclusion that they are not cost-effective. We believe that the cost-effectiveness of residential new construction programs can be improved by: (1) promoting technologies and advanced building design practices that significantly exceed state and federal standards; (2) reducing program marketing costs and developing more effective marketing strategies; (3) recognizing the role of these programs in increasing compliance with existing state building codes; and (4) allowing utilities to obtain an ``energy-savings credit`` from utility regulators for program spillover (market transformation) impacts. Utilities can also leverage their resources in seizing these opportunities by forming strong and trusting partnerships with the building community and with local and state government.

  16. Producing Reality Stardom: Constructing, Programming, and Branding Celebrity on Reality Television

    OpenAIRE

    Giggey, Lindsay Nicole

    2017-01-01

    The popular preoccupation with celebrity in American culture in the past decade has been bolstered by a corresponding increase in the amount of reality programming across cable and broadcast networks that centers either on established celebrities or on celebrities in the making. This dissertation examines the questions: How is celebrity constructed, scheduled, and branded by networks, production companies, and individual participants, and how do the constructions and mechanisms of celebrity i...

  17. Assumption and program of the earlier stage construction of L/ILW disposal site

    International Nuclear Information System (INIS)

    Li Xuequn; Chen Shi; Li Xinbang

    1993-01-01

    The authors analysed the production and treatment of low- and intermediate-level radwastes (L/ILW) in China. Some problems and situation in this field are introduced. Over the past ten years, preliminary efforts have been made by CNNC (China National Nuclear Corporation) in policy, law and rules, developing program, management system, siting, engineering techniques, and safety assessment for radwaste disposal. The investment of the earlier stage work of L/ILW disposal site construction is estimated, the program and assumption to disposal site construction of the L/ILW are reviewed

  18. NEW INSTRUMENTS FOR MANAGEMENT OF CONSTRUCTION PROGRAMS AND PROJECTS IN THE NEW ECONOMY STRUCTURE

    Directory of Open Access Journals (Sweden)

    Silka Dmitriy Nikolaevich

    2017-11-01

    Full Text Available Subject: the new economy structure is directly related to the active application of digital technologies. Economic processes are more formalized and for making administrative decisions it becomes possible to operate in a greater degree with precise criteria and information than probabilistic assumptions. As a subject of research, new tools for managing construction programs and projects are presented. Research objectives: the purpose of the study is to formulate general principles and directions for the digitization of economic relations in investment and construction activities to ensure the effectiveness of implementation of new generation projects. Materials and methods: to achieve the goal, the article shows the composition of state programs and projects in the construction sector and the system problems of their implementation. Organizational methods of increasing their effectiveness are considered. Results: the most promising areas of implementation of new management tools for investment and construction programs and projects are identified. Conclusions: the article shows the current dynamics of changes in technical and socio-economic systems at the level of construction sector. It is pointed out that the tasks of socio-economic nature require the development of unique approaches since the peculiarities of Russian legislation, of the prevailing norms and rules of economic activity prevent the direct replication of successful foreign experience.

  19. Constructing Adult Literacies at a Local Literacy Tutor-Training Program

    Science.gov (United States)

    Roderick, Ryan

    2013-01-01

    This study investigates how literacy was constructed at an adult literacy organization's volunteer tutor-training program. By drawing on qualitative analysis of training texts used during training, such as training evaluations, and data gathered from interviews with experienced tutors, it is possible to identify the assumptions about literacy…

  20. The AUSTRAL VLBI observing program

    Science.gov (United States)

    Plank, L.; Lovell, J. E. J.; McCallum, J. N.; Mayer, D.; Reynolds, C.; Quick, J.; Weston, S.; Titov, O.; Shabala, S. S.; Böhm, J.; Natusch, T.; Nickola, M.; Gulyaev, S.

    2017-07-01

    The AUSTRAL observing program was started in 2011, performing geodetic and astrometric very long baseline interferometry (VLBI) sessions using the new Australian AuScope VLBI antennas at Hobart, Katherine, and Yarragadee, with contribution from the Warkworth (New Zealand) 12 m and Hartebeesthoek (South Africa) 15 m antennas to make a southern hemisphere array of telescopes with similar design and capability. Designed in the style of the next-generation VLBI system, these small and fast antennas allow for a new way of observing, comprising higher data rates and more observations than the standard observing sessions coordinated by the International VLBI Service for Geodesy and Astrometry (IVS). In this contribution, the continuous development of the AUSTRAL sessions is described, leading to an improvement of the results in terms of baseline length repeatabilities by a factor of two since the start of this program. The focus is on the scheduling strategy and increased number of observations, aspects of automated operation, and data logistics, as well as results of the 151 AUSTRAL sessions performed so far. The high number of the AUSTRAL sessions makes them an important contributor to VLBI end-products, such as the terrestrial and celestial reference frames and Earth orientation parameters. We compare AUSTRAL results with other IVS sessions and discuss their suitability for the determination of baselines, station coordinates, source coordinates, and Earth orientation parameters.

  1. A worksite prevention program for construction workers: Design of a randomized controlled trial

    NARCIS (Netherlands)

    Oude Hengel, K.M.; Joling, C.I.; Proper, K.I.; Blatter, B.M.; Bongers, P.M.

    2010-01-01

    Background. A worksite prevention program was developed to promote the work ability of construction workers and thereby prolong a healthy working life. The objective of this paper is to present the design of a randomized controlled trial evaluating the effectiveness of that intervention program

  2. [Design for constructability studies in support of the DOE ALWR (Advanced Light Water Reactor) Program

    International Nuclear Information System (INIS)

    1990-03-01

    An objective of this program was to influence two key areas: inputs to plant design that can enhance constructability; and improvements in the construction process. The investigations, workshops, meetings, and studies focused the program topics toward these areas. This document, Volume IV is Enchancing Constructability through design. The report is arranged to produce sections on major issues in each subject. At the end of each section are significant conclusions divided as: recommendations--conclusions worthy of acceptance; considerations--conclusions that were not universally accepted in the discussions but should be taken into account; and cautions--conclusions that should be evaluated to avoid past problems

  3. Determining Safety Inspection Thresholds for Employee Incentives Programs on Construction Sites.

    Science.gov (United States)

    Sparer, Emily; Dennerlein, Jack

    2013-01-01

    The goal of this project was to evaluate approaches of determining the numerical value of a safety inspection score that would activate a reward in an employee safety incentive program. Safety inspections are a reflection of the physical working conditions at a construction site and provide a safety score that can be used in incentive programs to reward workers. Yet it is unclear what level of safety should be used when implementing this kind of program. This study explored five ways of grouping safety inspection data collected during 19 months at Harvard University-owned construction projects. Each approach grouped the data by one of the following: owner, general contractor, project, trade, or subcontractor. The median value for each grouping provided the threshold score. These five approaches were then applied to data from a completed project in order to calculate the frequency and distribution of rewards in a monthly safety incentive program. The application of each approach was evaluated qualitatively for consistency, competitiveness, attainability, and fairness. The owner-specific approach resulted in a threshold score of 96.3% and met all of the qualitative evaluation goals. It had the most competitive reward distribution (only 1/3 of the project duration) yet it was also attainable. By treating all workers equally and maintaining the same value throughout the project duration, this approach was fair and consistent. The owner-based approach for threshold determination can be used by owners or general contractors when creating leading indicator incentives programs and by researchers in future studies on incentive program effectiveness.

  4. Duct Remediation Program: Engineered access research and construction

    International Nuclear Information System (INIS)

    Beckman, T.D.; Davis, M.M.; Karas, T.M.

    1992-01-01

    The Rocky Flats Plant, Duct Remediation mission concentrated on removing Plutonium Oxide from the process ductwork in the primary Plutonium processing facility. When possible, remediation took place from existing process gloveboxes. Fifteen locations were identified, however, that required accessing duct runs where no process gloveboxes existed. The building's second floor utility areas had many locations where long, inaccessible duct runs were prevalent. Consequently, an extensive program for design, procurement and construction was initiated to contain and isolate ducts for penetration when existing glovebox sites were not present

  5. Community Building Services Training Program: A Model Training Program to Provide Technical Training for Minority Adults in Construction, Building Maintenance,and Property Management. Final Report.

    Science.gov (United States)

    Community Building Maintenance Corp., Chicago, IL.

    A demonstration program, administered by a community based building maintenance, management, and construction corporation, was developed to provide technical training for minority adults in construction, building maintenance, and property management in the Chicago area. The program was concerned with seeking solutions to the lack of housing, job…

  6. Construction quality assurance program plan for the WIPP project, Carlsbad, NM

    International Nuclear Information System (INIS)

    1987-05-01

    The purpose of this plan is to describe the Quality Assurance (QA) Program to be established and implemented by the US Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP) Project Office (WPO) and by the Major Project Participants: the Architect-Engineer (Bechtel), the Construction Manager (US Army Corps of Engineers), the Scientific Advisor (Sandia National Laboratory), and the Management and Operating Contractor (Westinghouse Electric Corporation). This plan addresses the construction, including site evaluation, design, and turnover phases of WIPP. Other work in progress during the same period is controlled by DOE documents applicable to that work effort. The prime responsibility for ensuring the quality of construction rests with the DOE WIPP Project Office and is implemented through the combined efforts of the Construction Manager, the Construction Contractors, the Management and Operating Contractor, and the Architect-Engineer. Inspection and burden of proof of acceptability rests with the Construction Contractor as defined by the technical provisions of the contract and as otherwise specified by the DOE WIPP Project Office on an individual work-package basis. To the maximum extent possible, acceptance of work will be based upon first-hand witnessing by the Construction Manager and other representatives of the DOE organization

  7. Development and implementation of a construction environmental protection program at a solid radioactive waste management facility

    Energy Technology Data Exchange (ETDEWEB)

    Wong, T.S. [Atomic Energy of Canada Limited, Mississauga, Ontario (Canada); Bishop, T. [Atomic Energy of Canada Limited, Saint John, New Brunswick (Canada); Hickman, C.N. [Point Lepreau Generating Station, Saint John, New Brunswick (Canada)

    2007-07-01

    Refurbishment of ageing nuclear stations has great economic and environmental benefits, including reduced greenhouse gas emissions. The Government of New Brunswick (NB) decided in 2005 to refurbish the Point Lepreau Generating Station with Atomic Energy of Canada Limited (AECL) as the general contractor. The project includes construction of additional radioactive waste management facilities. AECL developed, for the construction project, an environmental protection program to comply with commitments made during the environmental assessment process, and regulatory requirements. The program covers detailed environmental plans, training courses, and engagement of consultants to provide training and conduct monitoring of the construction activities. Construction related environmental effects have been successfully mitigated and the monitoring results indicate compliance with all environmental requirements. (author)

  8. Penalty model for delay of bidding section construction period in South-to-North Water Diversion Eastern Route Project from perspective of programs

    Directory of Open Access Journals (Sweden)

    Jing-chun Feng

    2012-09-01

    Full Text Available According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculation of penalty for delay of the bidding section construction period with the critical path method, we studied the effects of contractor-induced delay of the bidding section construction period in detail, including the effects on the construction period of the bidding section itself, the earliest start times of the next bidding section and other subsequent bidding sections, and the construction period of the program, and then constructed a penalty model for delay of the bidding section construction period from the perspective of programs. Using the penalty model, we conducted a practical analysis of penalty for delay of the construction period of the Baoying station program in the South-to-North Water Diversion Project. The model can help determine the amount of penalty for delay of the construction period in bidding sections scientifically and reasonably.

  9. [Design for constructability studies in support of the DOE ALWR (Advanced Light Water Reactor) Program

    International Nuclear Information System (INIS)

    1990-03-01

    This technical report accounts for work performed as part of Duke Power Company's Design for Constructability Program. This program is contractual agreement AC03-86SF16566, part of the US Department of Energy's Technology Program in Support of Advanced Light Water Reactors. This report covers the period from contract inception (September 1986) through completion (March 1990). This report is divided into 4 volumes. Volume 1 includes the executive summary and significant program conclusions. The details supporting these conclusions are in Volume 3, Improving Construction Performance, and Volume 4, Enchancing Constructability Through Design. Volume 2 includes a description of the program, objectives, and approach. A significant conclusion from these discussions was the identification of a ''missing link'' in ALWR programs. With an essentially complete, certified design, the majority of the up-front planning and preparation for implementing the design can be accomplished. Though a monumental undertaking beyond the scope of this project, this up-front planning and preparation must be considered as the next logical step for standardization. Much of the planning can be repeated with future plants and marketed to recoup expenditures. Devoting resources to develop the standard design (evolutionary or passive) to a marketable, standard, and comprehensive plant package is essential to revitalizing the option of nuclear energy. The DOE should seriously consider devoting these resources as a logical extension of its ALWR support

  10. Social marketing to plan a fall prevention program for Latino construction workers.

    Science.gov (United States)

    Menzel, Nancy N; Shrestha, Pramen P

    2012-08-01

    Latino construction workers experience disparities in occupational death and injury rates. The Occupational Safety and Health Administration funded a fall prevention training program at the University of Nevada, Las Vegas in response to sharp increases in fall-related accidents from 2005 to 2007. The grant's purpose was to improve fall protection for construction workers, with a focus on Latinos. This study assessed the effectiveness of social marketing for increasing fall prevention behaviors. A multi-disciplinary team used a social marketing approach to plan the program. We conducted same day class evaluations and follow-up interviews 8 weeks later. The classes met trainee needs as evidenced by class evaluations and increased safety behaviors. However, Spanish-speaking Latinos did not attend in the same proportion as their representation in the Las Vegas population. A social marketing approach to planning was helpful to customize the training to Latino worker needs. However, due to the limitations of behavior change strategies, future programs should target employers and their obligation to provide safer workplaces. Copyright © 2012 Wiley Periodicals, Inc.

  11. KINKFOLD—an AutoLISP program for construction of geological cross-sections using borehole image data

    Science.gov (United States)

    Özkaya, Sait Ismail

    2002-04-01

    KINKFOLD is an AutoLISP program designed to construct geological cross-sections from borehole image or dip meter logs. The program uses the kink-fold method for cross-section construction. Beds are folded around hinge lines as angle bisectors so that bedding thickness remains unchanged. KINKFOLD may be used to model a wide variety of parallel fold structures, including overturned and faulted folds, and folds truncated by unconformities. The program accepts data from vertical or inclined boreholes. The KINKFOLD program cannot be used to model fault drag, growth folds, inversion structures or disharmonic folds where the bed thickness changes either because of deformation or deposition. Faulted structures and similar folds can be modelled by KINKFOLD by omitting dip measurements within fault drag zones and near axial planes of similar folds.

  12. Construction of Fixed Rate Non-Binary WOM Codes Based on Integer Programming

    Science.gov (United States)

    Fujino, Yoju; Wadayama, Tadashi

    In this paper, we propose a construction of non-binary WOM (Write-Once-Memory) codes for WOM storages such as flash memories. The WOM codes discussed in this paper are fixed rate WOM codes where messages in a fixed alphabet of size $M$ can be sequentially written in the WOM storage at least $t^*$-times. In this paper, a WOM storage is modeled by a state transition graph. The proposed construction has the following two features. First, it includes a systematic method to determine the encoding regions in the state transition graph. Second, the proposed construction includes a labeling method for states by using integer programming. Several novel WOM codes for $q$ level flash memories with 2 cells are constructed by the proposed construction. They achieve the worst numbers of writes $t^*$ that meet the known upper bound in many cases. In addition, we constructed fixed rate non-binary WOM codes with the capability to reduce ICI (inter cell interference) of flash cells. One of the advantages of the proposed construction is its flexibility. It can be applied to various storage devices, to various dimensions (i.e, number of cells), and various kind of additional constraints.

  13. Dynamic Programming Approach for Construction of Association Rule Systems

    KAUST Repository

    Alsolami, Fawaz

    2016-11-18

    In the paper, an application of dynamic programming approach for optimization of association rules from the point of view of knowledge representation is considered. The association rule set is optimized in two stages, first for minimum cardinality and then for minimum length of rules. Experimental results present cardinality of the set of association rules constructed for information system and lower bound on minimum possible cardinality of rule set based on the information obtained during algorithm work as well as obtained results for length.

  14. Dynamic Programming Approach for Construction of Association Rule Systems

    KAUST Repository

    Alsolami, Fawaz; Amin, Talha M.; Chikalov, Igor; Moshkov, Mikhail; Zielosko, Beata

    2016-01-01

    In the paper, an application of dynamic programming approach for optimization of association rules from the point of view of knowledge representation is considered. The association rule set is optimized in two stages, first for minimum cardinality and then for minimum length of rules. Experimental results present cardinality of the set of association rules constructed for information system and lower bound on minimum possible cardinality of rule set based on the information obtained during algorithm work as well as obtained results for length.

  15. The Jefferson Lab Quality Assurance Program for the SNS Superconducting Linac Construction Project

    International Nuclear Information System (INIS)

    Joseph Ozelis

    2003-01-01

    As part of a multi-laboratory collaboration, Jefferson Lab is currently engaged in the fabrication, assembly, and testing of 23 cryomodules for the superconducting linac portion of the Spallation Neutron Source (SNS) being built at Oak Ridge National Laboratory. As with any large accelerator construction project, it is vitally important that these components be built in a cost effective and timely manner, and that they meet the stringent performance requirements dictated by the project specifications. A comprehensive Quality Assurance (QA) program designed to help accomplish these goals has been implemented as an inherent component of JLab's SNS construction effort. This QA program encompasses the traditional spectrum of component performance, from incoming parts inspection, raw materials testing, through to sub-assembly and finished article performance evaluation

  16. A non-traditional multinational approach to construction inspection program

    International Nuclear Information System (INIS)

    Ram, Srinivasan; Smith, M.E.; Walker, T.F.

    2007-01-01

    The next generation of nuclear plants would be fabricated, constructed and licensed in markedly different ways than the present light water reactors. Non-traditional commercial nuclear industry suppliers, shipyards in Usa and international fabricators, would be a source to supply major components and subsystems. The codes of construction may vary depending upon the prevailing codes and standards used by the respective supplier. Such codes and standards need to be reconciled with the applicable regulations (e.g., 10 CFR 52). A Construction Inspection Program is an integral part of the Quality Assurance Measures required during the Construction Phase of the power plant. In order to achieve the stated cost and schedule goals of the new build plants, a nontraditional multi-national approach would be required. In lieu of the traditional approach of individual utility inspecting the quality of fabrication and construction, a multi-utility team approach is a method that will be discussed. Likewise, a multinational cooperative licensing approach is suggested taking advantage of inspectors of the regulatory authority where the component would be built. The multi-national approach proposed here is based on the principle of forming teaming agreements between the utilities, vendors and the regulators. For instance, rather than sending Country A's inspectors all over the world, inspectors of the regulator in Country B where a particular component is being fabricated would in fact be performing the required inspections for Country A's regulator. Similarly teaming arrangements could be set up between utilities and vendors in different countries. The required oversight for the utility or the vendor could be performed by their counterparts in the country where a particular item is being fabricated

  17. Sparsely-Observed Pulsating Red Giants in the AAVSO Observing Program

    Science.gov (United States)

    Percy, J. R.

    2018-06-01

    This paper reports on time-series analysis of 156 pulsating red giants (21 SRa, 52 SRb, 33 SR, 50 Lb) in the AAVSO observing program for which there are no more than 150-250 observations in total. Some results were obtained for 68 of these stars: 17 SRa, 14 SRb, 20 SR, and 17 Lb. These results generally include only an average period and amplitude. Many, if not most of the stars are undoubtedly more complex; pulsating red giants are known to have wandering periods, variable amplitudes, and often multiple periods including "long secondary periods" of unknown origin. These results (or lack thereof) raise the question of how the AAVSO should best manage the observation of these and other sparsely-observed pulsating red giants.

  18. Construction and clinical application of complex utility programs in the SEGAMS-80 system

    International Nuclear Information System (INIS)

    Mate, E.; Csirik, J.; Csernay, L.; Makay, A.

    1981-01-01

    SEGAMS-80 is a system for processing isotope-diagnostic pictures easily and safely for physicians. The functions built into the system form a tree-structure. In certain stages of processing, tables completed according to the medical point of view show identification and a short description of the actual performable functions. The functions available allow an interactive performance of diagnostic processes for different purposes. Interactivity is undesirable while processing routine examinations, since the functions to be performed, their sequence and parameters could be identical in all cases. SEGAMS-80 makes it possible to construct complex programs, to put them into the system and execute them. During the complex program the desired functions are automatically executed. The operator's interference is needed only where the author of the complex program has stated that it is necessary from the medical aspects. Experience gained with several SEGAMS-80 systems has shown that they can be successfully used in isotope diagnostics, without requiring any training in computing techniques from the physicians. A schematic description is given of the structure of SEGAMS-80 together with a detailed account of how to construct complex utility programs. (author)

  19. MATES in Construction: Impact of a Multimodal, Community-Based Program for Suicide Prevention in the Construction Industry

    Directory of Open Access Journals (Sweden)

    Graham Martin

    2011-11-01

    Full Text Available A large-scale workplace-based suicide prevention and early intervention program was delivered to over 9,000 construction workers on building sites across Queensland. Intervention components included universal General Awareness Training (GAT; general mental health with a focus on suicide prevention; gatekeeper training provided to construction worker volunteer ‘Connectors’; Suicide First Aid (ASIST training offered to key workers; outreach support provided by trained and supervised MIC staff; state-wide suicide prevention hotline; case management service; and postvention support provided in the event of a suicide. Findings from over 7,000 workers (April 2008 to November 2010 are reported, indicating strong construction industry support, with 67% building sites and employers approached agreeing to participate in MIC. GAT participants demonstrated significantly increased suicide prevention awareness compared with a comparison group. Connector training participants rated MIC as helpful and effective, felt prepared to intervene with a suicidal person, and knew where to seek help for a suicidal individual following the training. Workers engaged positively with the after-hours crisis support phone line and case management. MIC provided postvention support to 10 non-MIC sites and sites engaged with MIC, but not yet MIC-compliant. Current findings support the potential effectiveness and social validity of MIC for preventing suicide in construction workers.

  20. MATES in Construction: Impact of a Multimodal, Community-Based Program for Suicide Prevention in the Construction Industry

    Science.gov (United States)

    Gullestrup, Jorgen; Lequertier, Belinda; Martin, Graham

    2011-01-01

    A large-scale workplace-based suicide prevention and early intervention program was delivered to over 9,000 construction workers on building sites across Queensland. Intervention components included universal General Awareness Training (GAT; general mental health with a focus on suicide prevention); gatekeeper training provided to construction worker volunteer ‘Connectors’; Suicide First Aid (ASIST) training offered to key workers; outreach support provided by trained and supervised MIC staff; state-wide suicide prevention hotline; case management service; and postvention support provided in the event of a suicide. Findings from over 7,000 workers (April 2008 to November 2010) are reported, indicating strong construction industry support, with 67% building sites and employers approached agreeing to participate in MIC. GAT participants demonstrated significantly increased suicide prevention awareness compared with a comparison group. Connector training participants rated MIC as helpful and effective, felt prepared to intervene with a suicidal person, and knew where to seek help for a suicidal individual following the training. Workers engaged positively with the after-hours crisis support phone line and case management. MIC provided postvention support to 10 non-MIC sites and sites engaged with MIC, but not yet MIC-compliant. Current findings support the potential effectiveness and social validity of MIC for preventing suicide in construction workers. PMID:22163201

  1. Analysis Dataset - West Coast Groundfish Observer Program and At-Sea Hake Observer Program data collection, analysis and reporting

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Observer programs are the most comprehensive fishery dependent data collection system for total mortality estimation, protected species monitoring and discard data...

  2. AUTOMATA PROGRAMS CONSTRUCTION FROM SPECIFICATION WITH AN ANT COLONY OPTIMIZATION ALGORITHM BASED ON MUTATION GRAPH

    Directory of Open Access Journals (Sweden)

    Daniil S. Chivilikhin

    2014-11-01

    Full Text Available The procedure of testing traditionally used in software engineering cannot guarantee program correctness; therefore verification is used at the excess requirements to programs reliability. Verification makes it possible to check certain properties of programs in all possible computational states; however, this process is very complex. In the model checking method a model of the program is built (often, manually and requirements in terms of temporal logic are formulated. Such temporal properties of the model can be checked automatically. The main issue in this framework is the gap between the program and its model. Automata-based programming paradigm gives the possibility to overcome this limitation. In this paradigm, program logic is represented using finite-state machines. The advantage of finite-state machines is that their models can be constructed automatically. The paper deals with the application of mutation-based ant colony optimization algorithm to the problem of finite-state machine construction from their specification, defined by test scenarios and temporal properties. The presented approach has been tested on the elevator doors control problem as well as on randomly generated data. Obtained results show the ant colony algorithm is two-three times faster than the previously used genetic algorithm. The proposed approach can be recommended for inferring control programs for critical systems.

  3. Power Grid Construction Project Portfolio Optimization Based on Bi-level programming model

    Science.gov (United States)

    Zhao, Erdong; Li, Shangqi

    2017-08-01

    As the main body of power grid operation, county-level power supply enterprises undertake an important emission to guarantee the security of power grid operation and safeguard social power using order. The optimization of grid construction projects has been a key issue of power supply capacity and service level of grid enterprises. According to the actual situation of power grid construction project optimization of county-level power enterprises, on the basis of qualitative analysis of the projects, this paper builds a Bi-level programming model based on quantitative analysis. The upper layer of the model is the target restriction of the optimal portfolio; the lower layer of the model is enterprises’ financial restrictions on the size of the enterprise project portfolio. Finally, using a real example to illustrate operation proceeding and the optimization result of the model. Through qualitative analysis and quantitative analysis, the bi-level programming model improves the accuracy and normative standardization of power grid enterprises projects.

  4. The construction of power in family medicine bedside teaching: a video observation study.

    Science.gov (United States)

    Rees, Charlotte E; Ajjawi, Rola; Monrouxe, Lynn V

    2013-02-01

    Bedside teaching is essential for helping students develop skills, reasoning and professionalism, and involves the learning triad of student, patient and clinical teacher. Although current rhetoric espouses the sharing of power, the medical workplace is imbued with power asymmetries. Power is context-specific and although previous research has explored some elements of the enactment and resistance of power within bedside teaching, this exploration has been conducted within hospital rather than general practice settings. Furthermore, previous research has employed audio-recorded rather than video-recorded observation and has therefore focused on language and para-language at the expense of non-verbal communication and human-material interaction. A qualitative design was adopted employing video- and audio-recorded observations of seven bedside teaching encounters (BTEs), followed by short individual interviews with students, patients and clinical teachers. Thematic and discourse analyses of BTEs were conducted. Power is constructed by students, patients and clinical teachers throughout different BTE activities through the use of linguistic, para-linguistic and non-verbal communication. In terms of language, participants construct power through the use of questions, orders, advice, pronouns and medical/health belief talk. With reference to para-language, participants construct power through the use of interruption and laughter. In terms of non-verbal communication, participants construct power through physical positioning and the possession or control of medical materials such as the stethoscope. Using this paper as a trigger for discussion, we encourage students and clinical teachers to reflect critically on how their verbal and non-verbal communication constructs power in bedside teaching. Students and clinical teachers need to develop their awareness of what power is, how it can be constructed and shared, and what it means for the student

  5. The Abbott School Construction Program: NJ Department of Education Proposed Facilities Regulations. Analysis of Preschool Issues

    Science.gov (United States)

    Ponessa, Joan; Boylan, Ellen

    2004-01-01

    This report on preschool facilities analyzes regulations proposed by the New Jersey Department of Education (NJDOE) to implement the Educational Facilities Construction and Financing Act. (EFCFA). EFCFA, which authorizes and governs New Jersey's public school construction program, was enacted in July 2000 to implement the State Supreme Court's…

  6. Quality assurance program requirements (design and construction). Task RS 002-5. Revision 3

    International Nuclear Information System (INIS)

    1985-08-01

    This regulatory guide describes a method acceptable to the NRC staff for complying with regard to establishing and implementing the requisite quality assurance program for the design and construction of nuclear power plants. Guidance for the establishment and execution of quality assurance programs during operation and decommissioning of nuclear power plants have been or will be addressed in separate regulatory guides. Similarly, quality assurance provisions concerning fuel cycle facilities have been or will be addressed in separate regulatory guides

  7. A constructive Indian country response to the evidence-based program mandate.

    Science.gov (United States)

    Walker, R Dale; Bigelow, Douglas A

    2011-01-01

    Over the last 20 years governmental mandates for preferentially funding evidence-based "model" practices and programs has become doctrine in some legislative bodies, federal agencies, and state agencies. It was assumed that what works in small sample, controlled settings would work in all community settings, substantially improving safety, effectiveness, and value-for-money. The evidence-based "model" programs mandate has imposed immutable "core components," fidelity testing, alien programming and program developers, loss of familiar programs, and resource capacity requirements upon tribes, while infringing upon their tribal sovereignty and consultation rights. Tribal response in one state (Oregon) went through three phases: shock and rejection; proposing an alternative approach using criteria of cultural appropriateness, aspiring to evaluability; and adopting logic modeling. The state heard and accepted the argument that the tribal way of knowing is different and valid. Currently, a state-authorized tribal logic model and a review panel process are used to approve tribal best practices for state funding. This constructive response to the evidence-based program mandate elevates tribal practices in the funding and regulatory world, facilitates continuing quality improvement and evaluation, while ensuring that practices and programs remain based on local community context and culture. This article provides details of a model that could well serve tribes facing evidence-based model program mandates throughout the country.

  8. The Impact of Ecological Construction Programs on Grassland Conservation in Inner Mongolia, China

    NARCIS (Netherlands)

    Liu, Min; Dries, Liesbeth; Heijman, Wim; Huang, Jikun; Zhu, Xueqin; Hu, Yuanning; Chen, Haibin

    2018-01-01

    A series of Ecological Construction Programs have been initiated to protect the condition of grasslands in China during recent decades. However, grassland degradation is still severe, and conditions have not been restored as intended. This paper aims to empirically examine the effectiveness of these

  9. The technical feasibility of uranium enrichment for nuclear bomb construction at the parallel nuclear program plant

    International Nuclear Information System (INIS)

    Rosa, L.P.

    1990-01-01

    It is discussed the hole of the Parallel Nuclear Program is Brazil and the feasibility of uranium enrichment for nuclear bomb construction. This program involves two research centers, one belonging to the brazilian navy and another to the aeronautics. Some other brazilian institutes like CTA, IPEN, COPESP and CETEX and also taking part in the program. (A.C.A.S.)

  10. Program-oriented approach to resource saving issues in construction materials industry

    Directory of Open Access Journals (Sweden)

    Novikova Galina

    2017-01-01

    Full Text Available The construction as a sector of the economy is one of the largest consumers of energy resources, and the building materials industry is today one of the most energy-intensive construction industry. At the enterprises of the building materials industry the different approaches and methods are used to solve resource and energy problems. Energy saving is considered not as an complex approach in the enterprise activity, but as activity for the implementation of specific energy-saving projects, which have limitations in time and in resources. The authors suggest to use a softwareoriented approach to solving the problems of resource and energy saving. For practical application of program-oriented approach we offer to use a structuring method of the decision-making, not previously used to solve problems of resource and energy saving.

  11. Making the error-controlling algorithm of observable operator models constructive.

    Science.gov (United States)

    Zhao, Ming-Jie; Jaeger, Herbert; Thon, Michael

    2009-12-01

    Observable operator models (OOMs) are a class of models for stochastic processes that properly subsumes the class that can be modeled by finite-dimensional hidden Markov models (HMMs). One of the main advantages of OOMs over HMMs is that they admit asymptotically correct learning algorithms. A series of learning algorithms has been developed, with increasing computational and statistical efficiency, whose recent culmination was the error-controlling (EC) algorithm developed by the first author. The EC algorithm is an iterative, asymptotically correct algorithm that yields (and minimizes) an assured upper bound on the modeling error. The run time is faster by at least one order of magnitude than EM-based HMM learning algorithms and yields significantly more accurate models than the latter. Here we present a significant improvement of the EC algorithm: the constructive error-controlling (CEC) algorithm. CEC inherits from EC the main idea of minimizing an upper bound on the modeling error but is constructive where EC needs iterations. As a consequence, we obtain further gains in learning speed without loss in modeling accuracy.

  12. Programs of quality improvement: an exploratory study in large Brazilian construction companies

    Directory of Open Access Journals (Sweden)

    Silvia Helena Boarin Pinto

    2009-03-01

    Full Text Available This article aims to identify the major characteristics of the implementation of quality programs in large construction companies in Brazil. This study focuses on the most accepted and implemented models such as ISO 9000:2000, ISO 14001, Six Sigma and Total Quality Management (TQM. An exploratory study was carried out in seven large companies (approximately 37% of the total number. These companies were chosen from the “500 Largest and Best Brazilian Companies” list, published by Exame Magazine, in 2005, out of a total number of 15 large companies in the sector. The indings of this study show that the companies have been implementing quality programs, have been using more basic quality tools, and have been dificulty accounting resources that come from the implementation of quality programs.

  13. Development of support tools for efficient construction of dynamic simulation program for engineering systems

    International Nuclear Information System (INIS)

    Gofuku, Akio

    1993-01-01

    In this study, two support tools are developed for construction of a dynamic simulation program for engineering systems (especially nuclear systems) by combining software modules. These are (1) a sub-system to support the module selection suitable for dynamic simulation and (2) a graphical user interface to support visual construction of simulation programs. The support tools are designed to be independent on the conception of software modules (data communication methods between modules). In the module selection sub-system of item 1, a module is characterized beforehand by keywords for several criteria. The similarity between the characteristic of requested module by users and that of registered modules in the module library is estimated by a weighted average of similarity indexes for criteria. In the module selection sub-system, the weights are flexibly extracted from users by applying the analytic hierarchy process. The graphical user interface helps users to specify both calling order of modules and data transfer between two modules. The availability of the support tools is evaluated by several sample problems of module selection and dynamic simulation model construction. The support tools will be a strong tool for the efficient usage of software modules. (author)

  14. Concept document of the repository-based software engineering program: A constructive appraisal

    Science.gov (United States)

    1992-01-01

    A constructive appraisal of the Concept Document of the Repository-Based Software Engineering Program is provided. The Concept Document is designed to provide an overview of the Repository-Based Software Engineering (RBSE) Program. The Document should be brief and provide the context for reading subsequent requirements and product specifications. That is, all requirements to be developed should be traceable to the Concept Document. Applied Expertise's analysis of the Document was directed toward assuring that: (1) the Executive Summary provides a clear, concise, and comprehensive overview of the Concept (rewrite as necessary); (2) the sections of the Document make best use of the NASA 'Data Item Description' for concept documents; (3) the information contained in the Document provides a foundation for subsequent requirements; and (4) the document adequately: identifies the problem being addressed; articulates RBSE's specific role; specifies the unique aspects of the program; and identifies the nature and extent of the program's users.

  15. 50 CFR 679.50 - Groundfish Observer Program.

    Science.gov (United States)

    2010-10-01

    ... weights, scale calibration records, bin sensor readouts, and production records. (viii) Assistance... regulations; printouts or tallies of scale weights; scale calibration records; bin sensor readouts; and... Program's drug and alcohol policy. Observer job pamphlets and the drug and alcohol policy are available...

  16. Lessons learned from new construction utility demand side management programs and their implications for implementing building energy codes

    Energy Technology Data Exchange (ETDEWEB)

    Wise, B.K.; Hughes, K.R.; Danko, S.L.; Gilbride, T.L.

    1994-07-01

    This report was prepared for the US Department of Energy (DOE) Office of Codes and Standards by the Pacific Northwest Laboratory (PNL) through its Building Energy Standards Program (BESP). The purpose of this task was to identify demand-side management (DSM) strategies for new construction that utilities have adopted or developed to promote energy-efficient design and construction. PNL conducted a survey of utilities and used the information gathered to extrapolate lessons learned and to identify evolving trends in utility new-construction DSM programs. The ultimate goal of the task is to identify opportunities where states might work collaboratively with utilities to promote the adoption, implementation, and enforcement of energy-efficient building energy codes.

  17. Hubble space telescope: The GO and GTO observing programs, version 3.0

    Science.gov (United States)

    Downes, Ron

    1992-01-01

    A portion of the observing time with the Hubble Space Telescope (HST) was awarded by NASA to scientists involved in the development of the HST and its instruments. These scientists are the Guaranteed Time Observers (GTO's). Observing time was also awarded to General Observers (GO's) on the basis of the proposal reviews in 1989 and 1991. The majority of the 1989 programs have been completed during 'Cycle 1', while the 1991 programs will be completed during 'Cycle 2', nominally a 12-month period beginning July 1992. This document presents abstracts of these GO and GTO programs, and detailed listings of the specific targets and exposures contained in them. These programs and exposures are protected by NASA policy, as detailed in the HST Call for Proposals (CP), and are not to be duplicated by new programs.

  18. Careers in Construction: Construction Industry Series: Student Manual and Instructor's Guide.

    Science.gov (United States)

    Texas Education Agency, Austin. Dept. of Occupational Education and Technology.

    The guide for instructors of construction occupations provides instructional suggestions and informational sources for structuring an exploratory program. The program is divided into the following blocks, representing different experiences in construction: (1) wood; (2) finishing; (3) engineering, support, and management services; (4) metal; (5)…

  19. Employers' Perception of Graduates with Entry-Level Technical Skills from Construction Industry Programs in Ghana and Nigeria

    Science.gov (United States)

    Acheampong, Philip

    2013-01-01

    The purpose of this comparative study was to identify the technical skills and abilities needed by prospective employees of construction industries in Ghana and Nigeria. Potential employees were defined here as recent graduates of construction industry programs with entry-level technical skills. The continuous growth in and expansion of these two…

  20. Observations and Student Perceptions of the Quality of Preservice Teachers' Teaching Behaviour: Construct Representation and Predictive Quality

    Science.gov (United States)

    Maulana, Ridwan; Helms-Lorenz, Michelle

    2016-01-01

    Observations and student perceptions are recognised as important tools for examining teaching behaviour, but little is known about whether both perspectives share similar construct representations and how both perspectives link with student academic outcomes. The present study compared the construct representation of preservice teachers' teaching…

  1. SNEAK assembly 12B - Construction and experimental program

    International Nuclear Information System (INIS)

    Helm, F.

    1982-10-01

    The assembly SNEAK 12A is the second SNEAK assembly in which the neutron physics of disturbed material configurations, as they might occur in a postulated fast reactor accident, is investigated. The core is characterized by a central zone with fuel rods containing PuO 2 UO 2 mixed oxide pellets. This zone is cylindrically surrounded by a buffer zone for spectral adaptation, a driver zone sufficiently reactive to maintain criticality and a radial depleted uranium blanket. The purpose of the experiments is to test calculational methods of neutron physics which are used in the accident analysis of fast breeder reactors. The report describes the construction of the core and its assemblies and their content and outlines the foreseen experimental program. It includes measurements in the clean critical core and investigations of vertical and horizontal fuel relocations and steel blockages

  2. 48 CFR 252.225-7045 - Balance of Payments Program-Construction Material Under Trade Agreements.

    Science.gov (United States)

    2010-10-01

    .... Designated country means— (1) A World Trade Organization Government Procurement Agreement (WTO GPA) country... another country, has been substantially transformed in a Free Trade Agreement country into a new and... Program-Construction Material Under Trade Agreements. 252.225-7045 Section 252.225-7045 Federal...

  3. Correlation between safety climate and contractor safety assessment programs in construction.

    Science.gov (United States)

    Sparer, Emily H; Murphy, Lauren A; Taylor, Kathryn M; Dennerlein, Jack T

    2013-12-01

    Contractor safety assessment programs (CSAPs) measure safety performance by integrating multiple data sources together; however, the relationship between these measures of safety performance and safety climate within the construction industry is unknown. Four hundred and one construction workers employed by 68 companies on 26 sites and 11 safety managers employed by 11 companies completed brief surveys containing a nine-item safety climate scale developed for the construction industry. CSAP scores from ConstructSecure, Inc., an online CSAP database, classified these 68 companies as high or low scorers, with the median score of the sample population as the threshold. Spearman rank correlations evaluated the association between the CSAP score and the safety climate score at the individual level, as well as with various grouping methodologies. In addition, Spearman correlations evaluated the comparison between manager-assessed safety climate and worker-assessed safety climate. There were no statistically significant differences between safety climate scores reported by workers in the high and low CSAP groups. There were, at best, weak correlations between workers' safety climate scores and the company CSAP scores, with marginal statistical significance with two groupings of the data. There were also no significant differences between the manager-assessed safety climate and the worker-assessed safety climate scores. A CSAP safety performance score does not appear to capture safety climate, as measured in this study. The nature of safety climate in construction is complex, which may be reflective of the challenges in measuring safety climate within this industry. Am. J. Ind. Med. 56:1463-1472, 2013. © 2013 Wiley Periodicals, Inc. © 2013 Wiley Periodicals, Inc.

  4. Probabilistic Programming : A True Verification Challenge

    NARCIS (Netherlands)

    Katoen, Joost P.; Finkbeiner, Bernd; Pu, Geguang; Zhang, Lijun

    2015-01-01

    Probabilistic programs [6] are sequential programs, written in languages like C, Java, Scala, or ML, with two added constructs: (1) the ability to draw values at random from probability distributions, and (2) the ability to condition values of variables in a program through observations. For a

  5. [Co-construction of a program to promote community participation among seniors living with psychosocial issues, with or without mental health problems].

    Science.gov (United States)

    Parisien, Manon; Nour, Kareen; Belley, Anne-Marie; Aubin, Ginette; Billette, Véronique; Dallaire, Bernadette

    Objectives A significant proportion of Quebec seniors are living with mental health problems or psychosocial issues such as isolation, bereavement, and psychological distress. These people face many forms of exclusion and are likely to have limited social participation. This paper describes the co-construction steps of a program aimed at promoting community participation among this population.Methods A method for the co-construction of innovative practices in health promotion was used to develop a program that is relevant, rigorous and feasible in diverse settings. The process included several steps, notably: need analysis among seniors and practitioners, development of a logical model for the program, preparation of the leader's manual, validation of the manual by experts, and pilot testing of the program among groups of seniors.Results The goal of the Count me in! program is to promote utilization of the resources of the community that can provide seniors living with mental health conditions or psychosocial issues with activities and positive social contact. The intervention is based on the Strength Model. It includes an individual interview, an eight-meeting workshop, visits to community resources, and collective production of media communication.Conclusion A co-construction process allowed the program to be continuously adjusted in response to stakeholders' feedback. The most important lever for the co-construction was the reconciliation of the partners' practical, conceptual, and experiential expertise. However, contextual factors such as the organization and the availability of mental health services for seniors constituted important barriers to the process.

  6. Wildfire: distributed, Grid-enabled workflow construction and execution

    Directory of Open Access Journals (Sweden)

    Issac Praveen

    2005-03-01

    Full Text Available Abstract Background We observe two trends in bioinformatics: (i analyses are increasing in complexity, often requiring several applications to be run as a workflow; and (ii multiple CPU clusters and Grids are available to more scientists. The traditional solution to the problem of running workflows across multiple CPUs required programming, often in a scripting language such as perl. Programming places such solutions beyond the reach of many bioinformatics consumers. Results We present Wildfire, a graphical user interface for constructing and running workflows. Wildfire borrows user interface features from Jemboss and adds a drag-and-drop interface allowing the user to compose EMBOSS (and other programs into workflows. For execution, Wildfire uses GEL, the underlying workflow execution engine, which can exploit available parallelism on multiple CPU machines including Beowulf-class clusters and Grids. Conclusion Wildfire simplifies the tasks of constructing and executing bioinformatics workflows.

  7. 25 CFR 170.404 - What happens when a tribe uses its IRR Program construction funds for transportation planning?

    Science.gov (United States)

    2010-04-01

    ... of Indian Reservation Roads Program Facilities Transportation Planning § 170.404 What happens when a... 25 Indians 1 2010-04-01 2010-04-01 false What happens when a tribe uses its IRR Program construction funds for transportation planning? 170.404 Section 170.404 Indians BUREAU OF INDIAN AFFAIRS...

  8. Computer aided construction of fault tree

    International Nuclear Information System (INIS)

    Kovacs, Z.

    1982-01-01

    Computer code CAT for the automatic construction of the fault tree is briefly described. Code CAT makes possible simple modelling of components using decision tables, it accelerates the fault tree construction process, constructs fault trees of different complexity, and is capable of harmonized co-operation with programs PREPandKITT 1,2 for fault tree analysis. The efficiency of program CAT and thus the accuracy and completeness of fault trees constructed significantly depends on the compilation and sophistication of decision tables. Currently, program CAT is used in co-operation with programs PREPandKITT 1,2 in reliability analyses of nuclear power plant systems. (B.S.)

  9. Mitigation of socio-economic impacts due to the construction of energy projects in rural communities: an evaluation of the Hartsville nuclear power plant transportation-mitigation program

    International Nuclear Information System (INIS)

    Whitney, T.C.

    1982-01-01

    This study analyzes the effects of a commuter ride-sharing program in mitigating the harmful socio-economic impacts of a short-term, labor-intensive nuclear-power-plant construction project. The major hypothesis is that transportation-mitigation programs are more cost-effective in reducing the undesirable socio-economic impacts of large-scale construction projects than programs designed to mitigate impacts through the provision of public services for migrating workers. The dissertation begins by delineating the socio-economic effects of large-scale construction projects in rural areas. It proceeds to show how some of the deleterious impacts were mitigated using a commuter ride-sharing program. After the range of potential socio-economic impacts was established, a framework was developed to evaluate the effects of the transportation-mitigation program in mediating the harmful impacts. The framework involved the integration of the cost-benefit technique with social-impact assessment. The evaluation was grounded in a comparative framework whereby the Hartsville project community was compared with a similar community undergoing the construction of a nuclear power plant but without a commuter ride-sharing program, and a community not experiencing a major construction project. The research findings indicated that the transportation-mitigation program substantially reduced the in-migration of construction workers into the Hartsville-Trousdale County area. Further, the program was cost effective, with a benefit-cost ratio of 2.5 and net benefits totalling 28 million dollars

  10. The Abbott School Construction Program: Report on the NJ Department of Education Proposed Regulations on Long-Range Facilities Plans

    Science.gov (United States)

    Ponessa, Joan

    2004-01-01

    This report on Long Range Facilities Plans (LRFPs) analyzes regulations proposed by the New Jersey Department of Education (NJDOE) to implement the Educational Facilities Construction and Financing Act. (EFCFA). EFCFA, which authorizes and governs New Jersey's public school construction program, was enacted in July 2000 to implement the State…

  11. Quality during construction

    International Nuclear Information System (INIS)

    Rogers, C.B.

    1977-01-01

    This paper outlines the quality assurance program used by Bechtel Corp. in constructing Nuclear Power Plants. As a tool for scheduling and visualizing situations during construction, power plant scale models are used. The use of models, preplanning, detail scheduling, and early development of procedures and inspection plans, have all contributed to a lower cost integrated quality program. Quality control and quality assurance are built in, thus satisfying the regulatory requirements

  12. Prioritization of proposed waste management construction projects for the Waste Management program within the Department of Energy

    International Nuclear Information System (INIS)

    Johnson, J.V.

    1995-01-01

    A prioritization process is used to evaluate and rank proposed construction projects within the Department of Energy's Waste Management program. The process is used to determine which projects should proceed with conceptual design activities. The proposed construction projects are evaluated against a set of criteria which reflect Waste Management priorities. A management review team ranks and scores the projects thereby generating a prioritized list of projects. Despite decreasing budgets and changing political climates, the process has been a successful decision-aiding tool for selecting construction projects to carry out the Waste Management mission within the Department of Energy

  13. Construction labor productivity during nuclear power plant construction

    International Nuclear Information System (INIS)

    Murray, W.B.

    1980-01-01

    This paper discusses the three different types of productivity programs used at the Wm. H. Zimmer Nuclear Power Station construction site. The Standard Cost Estimate as Productivity Measurement compares actual units installed to estimated units. The Manpower and Equipment Utilization Study measures the present utilization level of the construction work force, identifies opportunities for productivity improvement, and establishes a data base against which future improvements could be made. The special productivity program is a specialized and detailed study of first line supervision. Productivity is defined as the degree of efficiency attained in the use of labor, professional and management skills and knowledge, materials and equipment, and time and money to produce an end result. It is concluded that a more consistent system of productivity measurements needs to be developed and promoted for general use in the construction industry

  14. Constructive conflict coverage - A social-psychological research and development program

    Directory of Open Access Journals (Sweden)

    Wilhelm Kempf

    2003-10-01

    Full Text Available Peace journalism is a relatively new research area in psychology which emerged in the last decade of the last century. Building on findings from social psychology (group processes, social influence, conflict research, attitude change, propaganda, and enemy concept research and on models of conflict management and the constructive transformation of conflicts, an investigation is made of the factors that determine the escalation oriented bias of conventional war reporting, and of how this can be transformed into de-escalation and/or peace oriented conflict reporting. This paper provides an outline of this research and development program in six sections: (1 Interest Perception, (2 Task Formulation, (3 Basic Theoretical Assumptions, (4 War Discourse vs. Peace Discourse, (5 a Two Step Model, and (6 Journalist Training.

  15. Development status of the HTGR in the world. Outline and construction status of the demonstration HTGR program (HTR-PM) of China

    International Nuclear Information System (INIS)

    Ohashi, Kazutaka; Okamoto, Futoshi; Mouri, Tomoaki; Saito, Masanao; Nishio, Hiroki; Ohashi, Junpei

    2014-01-01

    Based on successful construction and operation experiences of HTR-10 reactor with pebble bed fuel and helium coolant, HTR-PM (HTR Pebble-bed Modular) reactor program was under way with 200 MWe of twin reactors with the same core configuration as HTR-10 reactor, which, each with a single steam generator, would drive a single steam turbine. Core height was 11 meters, and main steam temperature would be at 566 C. Although HTR-PM reactor program was interrupted by effects of the Fukushima accident, first concrete basement construction was started in December 2012 with aiming at connecting the Grid in 2017. This article reviewed outline and construction status of HTR-PM reactor in China. (T. Tanaka)

  16. Overview of GNSS-R Research Program for Ocean Observations at Japan

    Science.gov (United States)

    Ichikawa, Kaoru; Ebinuma, Takuji; Akiyama, Hiroaki; Kitazawa, Yukihito

    2015-04-01

    GNSS-R is a new remote-sensing method which uses reflected GNSS signals. Since no transmitters are required, it is suitable for small satellites. Constellations of GNSS-R small satellites have abilities on revolutionary progress on 'all-time observable' remote-sensing methods . We have started a research program for GNSS-R applications on oceanographic observations under a contract with MEXT (Ministry of Education Culture, Sports, Science and Technology, JAPAN) as a'Space science research base formation program'. The duration of research program is 3 years (2015-2017). The one of important focuses of this program is creation of a new community to merge space engineering and marine science through establishment on application plans of GNSS-R. Actual GNSS-R data acquisition experiments using multi-copters, ships, and/or towers are planned, together with in-situ sea truth data such as wave spectrum, wind speed profiles and sea surface height. These data are compared to determine the accuracy and resolution of the estimates based on GNSS-R observations. Meanwhile, preparation of a ground station for receiving GNSS-R satellite data will be also established. Whole those data obtained in this project will be distributed for public. This paper introduces the overview of research plan..

  17. High Resolution Active Optics Observations from the Kepler Follow-up Observation Program

    Science.gov (United States)

    Gautier, Thomas N.; Ciardi, D. R.; Marcy, G. W.; Hirsch, L.

    2014-01-01

    The ground based follow-up observation program for candidate exoplanets discovered with the Kepler observatory has supported a major effort for high resolution imaging of candidate host stars using adaptive optics wave-front correction (AO), speckle imaging and lucky imaging. These images allow examination of the sky as close as a few tenths of an arcsecond from the host stars to detect background objects that might be the source of the Kepler transit signal instead of the host star. This poster reports on the imaging done with AO cameras on the Keck, Palomar 5m and Shane 3m (Lick Observatory) which have been used to obtain high resolution images of over 500 Kepler Object of Interest (KOI) exoplanet candidate host stars. All observations were made at near infrared wavelengths in the J, H and K bands, mostly using the host target star as the AO guide star. Details of the sensitivity to background objects actually attained by these observations and the number of background objects discovered are presented. Implications to the false positive rate of the Kepler candidates are discussed.

  18. Direct AFM observation of an opening event of a DNA cuboid constructed via a prism structure.

    Science.gov (United States)

    Endo, Masayuki; Hidaka, Kumi; Sugiyama, Hiroshi

    2011-04-07

    A cuboid structure was constructed using a DNA origami design based on a square prism structure. The structure was characterized by atomic force microscopy (AFM) and dynamic light scattering. The real-time opening event of the cuboid was directly observed by high-speed AFM.

  19. 77 FR 17458 - Proposed Information Collection; Comment Request; Observer Programs' Information that Can Be...

    Science.gov (United States)

    2012-03-26

    ... DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration Proposed Information Collection; Comment Request; Observer Programs' Information that Can Be Gathered Only Through Questions... options; and (5) ensure that the observer programs can safely and efficiently collect the information...

  20. IRT-based test construction

    OpenAIRE

    van der Linden, Willem J.; Theunissen, T.J.J.M.; Boekkooi-Timminga, Ellen; Kelderman, Henk

    1987-01-01

    Four discussions of test construction based on item response theory (IRT) are presented. The first discussion, "Test Design as Model Building in Mathematical Programming" (T.J.J.M. Theunissen), presents test design as a decision process under certainty. A natural way of modeling this process leads to mathematical programming. General models of test construction are discussed, with information about algorithms and heuristics; ideas about the analysis and refinement of test constraints are also...

  1. [Construction of abridged life table for health evaluation of local resident using Excel program].

    Science.gov (United States)

    Chen, Qingsha; Wang, Feng; Li, Xiaozhen; Yang, Jian; Yu, Shouyi; Hu, Jun

    2012-05-01

    To provide an easy computational tool for evaluating the health condition of local residents. An abridged life table was programmed by applying mathematical functions and formula in Excel program and tested with the real study data to evaluate the results computed. The Excel was capable of computing group death probability of age in the life table ((n)q(x)), number of survivors (l(x)), number of death ((n)d(x)), survival per person-year ((n)L(x)), survival total per person-year (T(x)) and life expectancy (e(x)). The calculated results were consistent with those by SAS. The abridged life table constructed using Microsoft Excel can conveniently and accurately calculate the relevant indices for evaluating the health condition of the residents.

  2. Construction of a mentor’s identity: the Mentor Online Education Program in focus

    Directory of Open Access Journals (Sweden)

    Aline Maria de Medeiros Rodrigues Reali

    2018-05-01

    Full Text Available This paper presents analyzes related to the processes of a mentor identity construction, professional development and learning identification of an experienced teacher, evidenced on her participation in the Mentor Online Education Program. For development of the intervention research, we considered theoretical references on teacher education and the written narratives role for recording reflective processes about practice. The data were examined within an interpretive way from online activities. The results showed that new knowledge was constructed and incorporated into the participant’s knowledge base, assisting her to perform mentoring functions when advising a beginning teacher in her difficulties. The initiative and its investigation have shown to be significant to promote the teaching learning of beginning teachers in a supervised way. We considered that, in view of the absence of consolidated public policies in the supervision of beginning teachers by experienced ones, in Brazil, the relevance of the research conducted was enlarged.

  3. A Program Applying Professional Safety Basics in Construction Projects

    Directory of Open Access Journals (Sweden)

    Entisar Kadhim Rasheed

    2016-04-01

    Full Text Available When industrial and constructional renaissance started in the world, the great interest was going on towards the equipment’s, which was the first mean for production. After industry was settled the interest was going on towards the men ship which manpower on which the production depends. It was approved that it represents the basic part in all of the processes and the protection of those individuals against dangers of these equipment’s, industry and its accidents was the basic things which was studied in many researches until it crystallized in general principles for all industries and other take care in each industry. The professional safety is concerned as restrict which aims to take care of humanitarian and material principles also to raise the production of these principles, in the aspect of safety, health and providing the suitable healthy condition to the worker so he can feel safety, confidence and sociological settle, this will increase the production. So In order to maintain the manpower of business risks and to enable them to fulfill their role better to increase production and improve the quality and maintain the machine and supporting the national economy and keep pace with industrial developments and technological came the idea of research to focus on the importance of studying the subject of occupational safety by conducting a field survey to see the reality of professional safety in the relevant departments and work sites and through a questionnaire on the subject and conduct personal interviews with those concerned in this area and to prepare a program for the application of professional safety for each resource (labor, machines, materials, money in construction sites and departments concerned.

  4. Solid construction waste management in large civil construction companies through use of specific software - case study

    Directory of Open Access Journals (Sweden)

    Caio Dalla Zanna

    2017-05-01

    Full Text Available In the current construction market there is a high demand for sustainability. In addition to that the Brazilian government is enacting tougher and tougher legislation on the disposal of solid construction waste. These demands increasingly make the construction company responsible for the entire lifecycle of its waste as well as the accompanying cost and environmental impact of solid waste. A software program was used in the research which allows construction companies gather information about waste. This helps the decision makers, at all different levels of the company improving waste management through better decisions. The software program was used during the construction of two residential buildings, constructed by a large construction company in the South of Brazil. Five key performance indicators were used by the construction company team: Generated Waste Height (cm, cost per built area (R$ m-², Waste Segregation Quality Index (WSQI, Effective Waste Management Index (EWMI and Waste Management Quality Index (WMQI. After four months the total cost of waste management was R$ 83,551.71 for site A and R$ 91,668.02 for site B. About 70% of the waste was raw material waste. The software program provided information not previously available, which made it possible to calculate the cost of material loss, indicating corrective actions, all without losing sight of cost reduction opportunities for the management of Solid construction Waste (SCW.

  5. The effectiveness of a construction worksite prevention program on work ability, health, and sick leave: Results from a cluster randomized controlled trial

    NARCIS (Netherlands)

    Oude Hengel, K.M.; Blatter, B.M.; Molen, H.F. van der; Bongers, P.M.; Beek, A.J. van der

    2013-01-01

    Objective This study aimed to investigate the effectiveness of a prevention program on work ability, health, and sick leave targeted at construction worksites. Methods A total of 15 departments (N=297 workers) from 6 construction companies participated in this cluster randomized controlled trial and

  6. Prevention program at construction worksites aimed at improving health and work ability is cost-saving to the employer: Results from an RCT

    NARCIS (Netherlands)

    Oude Hengel, K.M.; Bosmans, J.E.; Dongen, J.M. van; Bongers, P.M.; Beek, A.J. van der; Blatter, B.M.

    2014-01-01

    Background: To prolong sustainable healthy working lives of construction workers, a prevention program was developed which aimed to improve the health and work ability of construction workers. The objective of this study was to analyze the cost-effectiveness and financial return from the employers'

  7. Co-ordination of satellite and data programs: The committee on earth observation satellites' approach

    Science.gov (United States)

    Embleton, B. J. J.; Kingwell, J.

    1997-01-01

    parameter by space borne sensors. Mechanisms used by CEOS to carry out these tasks are built upon consensus and understanding, as well as on technology transfer between countries. An area of recent heightened endeavour in CEOS has been to determine and address the special needs of developing countries in respect of Earth observation data. In the next several years, a new wave of Earth observation will break, as the private sector, revitalised with decommissioned military technology, brings exciting new capabilities to international remote sensing. With rapidly burgeoning markets in spatial information or geomatics, as well as the continuing thirst of science programs for spatial information, there is a challenge upon the international space community to reassess continually, the most expedient and socially constructive means of making available in a fair and open way, geographically-reference information obtained with space observation systems.

  8. Reductions in employee productivity impairment observed after implementation of web-based worksite health promotion programs.

    Science.gov (United States)

    Silberman, Jordan; Schwartz, Steven; Giuseffi, Danielle L; Wang, Chun; Nevedal, Dana; Bedrosian, Richard

    2011-12-01

    To assess changes in employee productivity impairment observed after the implementation of several Web-based health promotion programs. Health risk assessments and self-report measures of productivity impairment were administered on-line to more than 43,000 participants of Web-based health promotion programs. Reductions in productivity impairment were observed after 1 month of program utilization. Productivity impairment at 90- and 180-day follow-ups also decreased relative to baseline. Improvements in employee health were associated with reductions in employee productivity impairment. The use of Web-based health promotion programs was associated with reductions in productivity impairment and improvements in employee health. After the implementation of Web-based health promotion programs, reductions in productivity impairment may be observed before reductions in direct health care costs.

  9. License renewal demonstration program: NRC observations and lessons learned

    International Nuclear Information System (INIS)

    Prato, R.J.; Kuo, P.T.; Newberry, S.F.

    1996-12-01

    This report summarizes the Nuclear Regulatory Commission staff's observations and lessons learned from the five License Renewal Demonstration Program (LRDP) site visits performed by the staff from March 25, 1996, through August 16, 1996. The LRDP was a Nuclear Energy Institute (NEI) program intended to assess the effectiveness of the guidance provided by NEI 95-10, Revision 0, open-quotes Industry Guideline for Implementing the Requirements of 10 CFR Part 54 - The License Renewal Rule,close quotes to implement the requirements of Title 10 of the Code of Federal Regulations, Part 54 (10 CFR Part 54), open-quotes Requirements for Renewal of Operating Licenses for Nuclear Power Plants.close quotes In general, NEI 95-10 appeared to contain the basic guidance needed for scoping, screening, identifying aging effects, developing aging management programs, and performing time-limited aging analyses. However, inconsistent implementation of this guidance in some areas was an indication that clarification of existing guidance and/or the inclusion-of some new guidance may be needed for applicants to develop a license renewal program that is consistent with the intent of the rule

  10. Experience in Using Russian Program Complex «APM Winmachine» for Computing Local Strength of the Umbilical Mast Bearing Construction in the SR “Soyuz-2.1B"

    Directory of Open Access Journals (Sweden)

    V. A. Zverev

    2015-01-01

    Full Text Available The research concerns the computational analyses of local strength of the umbilical mast (UM, which is designed for the prelaunch preparation and launch security of the space rocket (SR "SOYUZ-2" of 1B stage.Based on the finite elements method, modeling and calculation of local strength for the most loaded UM elements are conducted using Russian program complex «APM WINMACHINE». The paper gives a justification for choosing the program complex «APM WINMACHINE, as a program calculation device.In calculating the principles of a local analysis are used. Physical models of the UM particular constructive units are formed to observe them under certain boundary conditions: forces and movements. Parameters of boundary conditions are determined in terms of stress-strain condition of UM simplified model as a whole.As the research results, the paper presents the finite element models of two UM constructive units, namely a joint of the mast farm branches with strengthening of the mast rotating part and an element in the UM bottom rotating part (“the spine”. Besides, there are also the calculated results of the local strength of abovementioned UM rotating part units: a general pattern of the stress distribution with stress values exceeding the allowable ones.The research results allow us to draw conclusions that the units under consideration have performance capability and require their constructive strengthening.The UM developers have taken in consideration recommendations, based on the UM rotating part local strength calculation, making appropriate correction in the project documentation. The experience gained in using the «APM WINMACHINE» allowed us to support the conclusion that it is efficient to solve the tasks of defining stress-strain condition of complicated spatial constructions.

  11. 45 CFR 1170.33 - New construction.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 3 2010-10-01 2010-10-01 false New construction. 1170.33 Section 1170.33 Public... ASSISTED PROGRAMS OR ACTIVITIES Accessibility § 1170.33 New construction. (a) Design, construction, and... Federal Accessibility Standards. (1) Effective as of January 18, 1991, design, construction, or alteration...

  12. Two-Component Structure of the Radio Source 0014+813 from VLBI Observations within the CONT14 Program

    Science.gov (United States)

    Titov, O. A.; Lopez, Yu. R.

    2018-03-01

    We consider a method of reconstructing the structure delay of extended radio sources without constructing their radio images. The residuals derived after the adjustment of geodetic VLBI observations are used for this purpose. We show that the simplest model of a radio source consisting of two point components can be represented by four parameters (the angular separation of the components, the mutual orientation relative to the poleward direction, the flux-density ratio, and the spectral index difference) that are determined for each baseline of a multi-baseline VLBI network. The efficiency of this approach is demonstrated by estimating the coordinates of the radio source 0014+813 observed during the two-week CONT14 program organized by the International VLBI Service (IVS) in May 2014. Large systematic deviations have been detected in the residuals of the observations for the radio source 0014+813. The averaged characteristics of the radio structure of 0014+813 at a frequency of 8.4 GHz can be calculated from these deviations. Our modeling using four parameters has confirmed that the source consists of two components at an angular separation of 0.5 mas in the north-south direction. Using the structure delay when adjusting the CONT14 observations leads to a correction of the average declination estimate for the radio source 0014+813 by 0.070 mas.

  13. Shuttle Rocket Motor Program: NASA should delay awarding some construction contracts. Report to the Chair, Subcommittee on Government Activities and Transportation, Committee on Government Operations, House of Representatives

    Science.gov (United States)

    1992-01-01

    Even though the executive branch has proposed terminating the Advanced Solid Rocket Motor (ASRM) program, NASA is proceeding with all construction activity planned for FY 1992 to avoid schedule slippage if the program is reinstated by Congress. However, NASA could delay some construction activities for at least a few months without affecting the current launch data schedule. For example, NASA could delay Yellow Creek's motor storage and dock projects, Stennis' dock project, and Kennedy's rotation processing and surge facility and dock projects. Starting all construction activities as originally planned could result in unnecessarily incurring additional costs and termination liability if the funding for FY 1993 is not provided. If Congress decides to continue the program, construction could still be completed in time to avoid schedule slippage.

  14. Construction of Engineering Education Program based on the Alumni's Evaluation of the Educational Outcome

    Science.gov (United States)

    Tsukamoto, Takehiko; Nishizawa, Hitoshi

    The Department of Electrical and Electronic Engineering in Toyota National College of Technology has put great emphasis on fundamental subjects, such as “electrical and electronic circuit" and “electromagnetism" more than 40 years. On the other hand, several issues of our college were clarified by the alumni's evaluation of the educational outcome in 2002. The most serious issue was low achievement of English and Social education. The alumni of all generation are dissatisfied with their low skill in English communication. As a part of the educational reforms, our department has constructed a new engineering education program focusing on fundamental ability. We introduced many problem-based-learning experiments and the compulsory subjects such as “English communication for electrical engineers" and “Engineering Ethics" into this program. Great educative results are obtained by these improvements. As a typical example, the scores of all 2nd grade students of advanced engineering course in TOEIC tests became 450 points or more. Our program has been authorized by JABEE since 2004.

  15. 34 CFR 76.662 - Construction.

    Science.gov (United States)

    2010-07-01

    ... 34 Education 1 2010-07-01 2010-07-01 false Construction. 76.662 Section 76.662 Education Office of... State and Its Subgrantees? Participation of Students Enrolled in Private Schools § 76.662 Construction. A subgrantee shall insure that program funds are not used for the construction of private school...

  16. Development Scaffolding for Construction of Evaluation Instrument Training Program on The Cognitive Domain For Senior High School Physics Teachers and The Same Level

    Science.gov (United States)

    Arif, W.; Suhandi, A.; Kaniawati, I.; Setiawan, A.

    2017-02-01

    The development of scaffolding for evaluation instrument construction training program on the cognitive domain for senior high school physics teacher and the same level that is specified in the test instrument has been done. This development was motivated by the low ability of the majority of physics teachers in constructing the physics learning achievement test. This situation not in accordance with the demands of Permendiknas RI no. 16 tahun 2007 concerning the standard of academic qualifications and competence of teachers, stating that teachers should have a good ability to develop instruments for assessment and evaluation of process and learning outcomes. Based on the preliminary study results, it can be seen that the main cause of the inability of teachers in developing physics achievement test is because they do not good understand of the indicators for each aspect of cognitive domains. Scaffolding development is done by using the research and development methods formulated by Thiagarajan which includes define, design and develope steps. Develop step includes build the scaffolding, validation of scaffolding by experts and the limited pilot implementations on the training activities. From the build scaffolding step, resulted the scaffolding for the construction of test instruments training program which include the process steps; description of indicators, operationalization of indicators, construction the itemsframework (items scenarios), construction the items stem, construction the items and checking the items. The results of the validation by three validator indicates that the built scaffolding are suitable for use in the construction of physics achievement test training program, especially for novice. The limited pilot implementation of the built scaffolding conducted in training activities attended by 10 senior high school physics teachers in Garut district. The results of the limited pilot implementation shows that the built scaffolding have a medium

  17. DEVELOPMENT OF THERAPEUTIC STRATEGIES FOR OBESITY AND COMORBID DISORDERS BASED ON OBSERVATIONAL PROGRAMS: INTERIM RESULTS OF THE RUSSIAN OBSERVATIONAL PROGRAM PRIMAVERA

    Directory of Open Access Journals (Sweden)

    E. A. Troshina

    2015-01-01

    Full Text Available Aim: To assess interim results of the Russian observational program PrimaVera on efficacy and safety sibutramine (Reduxin® for treatment of obesity within routine medical practice. Materials and methods: This multicenter observational program included patients with obesity aged below 65  years, excluding those with uncontrolled arterial hypertension, coronary heart disease, heart failure and cerebrovascular disease. All patients were administered sibutramine for treatment of their obesity. During out-patient follow-up visits, physicians assessed changes in patients’ body mass, blood pressure and heart rate, as well as registered adverse events. Maximal treatment duration was 12 months. In this report, the results from 16  515  patients are analyzed, 82% of whom (n=13 192 were females.Results: After 3  months of treatment body mass index (BMI decreased by 2.81±1.0  kg/m², after 6 months, by 5.17±2.15 kg/m². At 12 months decrease in BMI was 1.3-fold higher compared to 6  months’ results and amounted to 6.76±2.93  kg/m². Reduction of body mass with longterm (above 6  months treatment with sibutramine under supervision of a physician was associated with a decrease in systolic and diastolic blood pressure levels (by 4.1 mm Hg, in both cases and did not lead to an increase in heart rate (Δ=-1.02  bpm. Based on data from 16  515  medical records processed up to now, 397  episodes of adverse events were registered, with none of them being serious.Conclusion: This interim results of the program PrimaVera confirmed favorable safety profile of Reduxin® and its high efficacy in the treatment of obesity.

  18. Multicell fluidized bed boiler design construction and test program. Quarterly progress status report, January--March 1979

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-07-01

    The objective of this program is to design, construct, and test a multicell fluidized-bed boiler as a pollution-free method of burning high-sulfur or highly corrosive coals without excessive maintenance problems. The fluidized-bed boiler will provide approximately 300,000 pounds of steam per hour. Steam pressure and temperature conditions were selected to meet requirements of the site at which the boiler was installed.

  19. Results from the Prototype GLOBE at Night Worldwide Light Pollution Observation Program

    Science.gov (United States)

    Walker, Constance E.; Pompea, S. M.; Isbell, D.; Orellana, D.; Blurton, C.; Henderson, S.

    2006-06-01

    Students, families, and educators worldwide participated in GLOBE at Night - an international event designed to observe and record the visible stars as a means of measuring light pollution in a given location. Participation was open to anyone - anywhere in the world - who could get outside and look skyward during the week of March 22-29, 2006. Our goal was 5000 observations from around the world in this prototype program.The hands-on learning activities associated with the program were designed to extend the traditional classroom and school day with a week of nighttime observations involving teachers, students and their families. By locating specific constellations in the sky, students from around the world learned how the lights in their community contribute to light pollution. Students explored the different light sources in their community learning the relationship between science, technology and society, and they reported their observations online through a central database allowing for authentic worldwide research and analysis. The observations made during GLOBE at Night helped students and scientists together assess how the quality of the night sky varies around the world as well as the level of energy wastage associated with poorly-shielded lights.For more information, visit http://www.globe.gov/globeatnight.GLOBE at Night is a collaboration between The GLOBE Program, the National Optical Astronomy Observatory (NOAO), Centro de Apoyo a la Didactica de la Astronomia (CADIAS) in Chile , Windows to the Universe, and Environmental Systems Research Institute, Inc. (ESRI).

  20. TMAP: A NEO follow-up program utilizing undergraduate observers

    Science.gov (United States)

    Ramirez, C.; Deaver, D.; Martinez, R.; Foster, J.; Kuang, L.; Ates, A.; Anderson, M.; Mijac, M.; Gillam, S.; Hicks, M. D.

    2000-10-01

    In the spring of 2000 we began TMAP (Table Mountain Astrometry Project), a program designed to provide timely astrometric followup of newly discovered near-Earth asteroids. Relying on undergraduate observers from the local California State Universities, we have to date been involved with the over 50 NEO and new comet discoveries. This is a significant fraction of all near-Earth asteroids discovered over the time period. All observations are performed at JPL's Table Mountain Facility near Wrightwood California using the 0.6-meter telescope equipped with a Photometrics LN cooled 1k CCD mounted at the cassegrain focus. With this system we can routinely detect objects to R=20.5. We have typically scheduled two runs per month on weekends bracketing the new moon. The student observers man the telescope are trained to select and obtain R-band images of candidates from the Minor Planet Center's NEO Confirmation Page (http://cfa-www.harvard.edu/cfa/ps/NEO/TheNEOPage.html). The astrometry is then reduced and submitted to the Minor Planet Center the following day. TMAP has proven to be an efficient way both to obtain much needed astrometric measurements of newly discovered small bodies as well as to involve undergraduate researchers in planetary research. The limiting magnitudes provided by the 0.6-meter partially fills the gap between the extremely helpful and dedicated amateur astromitrists and the followup that the NEO detection programs do themselves. This work is supported by NASA.

  1. Construction of a universal quantum computer

    International Nuclear Information System (INIS)

    Lagana, Antonio A.; Lohe, M. A.; Smekal, Lorenz von

    2009-01-01

    We construct a universal quantum computer following Deutsch's original proposal of a universal quantum Turing machine (UQTM). Like Deutsch's UQTM, our machine can emulate any classical Turing machine and can execute any algorithm that can be implemented in the quantum gate array framework but under the control of a quantum program, and hence is universal. We present the architecture of the machine, which consists of a memory tape and a processor and describe the observables that comprise the registers of the processor and the instruction set, which includes a set of operations that can approximate any unitary operation to any desired accuracy and hence is quantum computationally universal. We present the unitary evolution operators that act on the machine to achieve universal computation and discuss each of them in detail and specify and discuss explicit program halting and concatenation schemes. We define and describe a set of primitive programs in order to demonstrate the universal nature of the machine. These primitive programs facilitate the implementation of more complex algorithms and we demonstrate their use by presenting a program that computes the NAND function, thereby also showing that the machine can compute any classically computable function.

  2. Family Income, Parent Education, and Perceived Constraints as Predictors of Observed Program Quality and Parent Rated Program Quality

    Science.gov (United States)

    Torquati, Julia C.; Raikes, Helen H.; Huddleston-Casas, Catherine A.; Bovaird, James A.; Harris, Beatrice A.

    2011-01-01

    Observed child care quality and parent perceptions of child care quality received by children in poor (below Federal Poverty Line, FPL), low-income (between FPL and 200% of FPL), and non-low-income families were examined. Observations were completed in 359 center- and home-based child care programs in four Midwestern states and surveys were…

  3. Observed Food Safety Practices in the Summer Food Service Program

    Science.gov (United States)

    Patten, Emily Vaterlaus; Alcorn, Michelle; Watkins, Tracee; Cole, Kerri; Paez, Paola

    2017-01-01

    Purpose/Objectives: The purpose of this exploratory, observational study was three-fold: 1) Determine current food safety practices at Summer Food Service Program (SFSP) sites; 2) Identify types of food served at the sites and collect associated temperatures; and 3) Establish recommendations for food safety training in the SFSP.…

  4. Linear programming model to construct phylogenetic network for 16S rRNA sequences of photosynthetic organisms and influenza viruses.

    Science.gov (United States)

    Mathur, Rinku; Adlakha, Neeru

    2014-06-01

    Phylogenetic trees give the information about the vertical relationships of ancestors and descendants but phylogenetic networks are used to visualize the horizontal relationships among the different organisms. In order to predict reticulate events there is a need to construct phylogenetic networks. Here, a Linear Programming (LP) model has been developed for the construction of phylogenetic network. The model is validated by using data sets of chloroplast of 16S rRNA sequences of photosynthetic organisms and Influenza A/H5N1 viruses. Results obtained are in agreement with those obtained by earlier researchers.

  5. Process evaluation of a multifaceted health program aiming to improve physical activity levels and dietary patterns among construction workers

    NARCIS (Netherlands)

    Viester, L.; Verhagen, E.A.L.M.; Bongers, P.M.; Beek, A.J. van der

    2014-01-01

    Objective: To evaluate the process of a health promotion program, aiming to improve physical activity levels and diet among construction workers. Methods: The process evaluation was conducted after the RE-AIM framework for the evaluation of the public health impact of health promotion interventions.

  6. Use of oil shale ash in road construction: results of follow-up environmental monitoring.

    Science.gov (United States)

    Reinik, Janek; Irha, Natalya; Koroljova, Arina; Meriste, Tõnis

    2018-01-05

    Oil shale ash (OSA) was used for road construction in a pristine swamp area in East-Estonia during 2013-2014. OSA was used as a binder both in mass stabilization of soft peat soil and in the upper layer. Use of OSA in civil engineering always raises questions about the environmental safety of such activities. Post-construction environmental monitoring of the pilot section was carried out in 2014 and 2015. The monitoring program involved surface water and soil sampling campaigns. Samples were analyzed for selected constituents and parameters of environmental concern. The paper gives data for assessing the environmental impact and evaluation of potential risks associated with construction of roads using OSA. Leaching of hazardous compounds from the pilot section to surrounding aqueous environment was not observed during the monitoring program. Still, the road construction affected the concentration of sulfates in surrounding surface water. Also, the water-soluble content of barium in surface water correlated significantly with the concentrations of chloride and sulfate ion and electric conductivity of the surface water. Therefore, it is recommended to monitor the electric conductivity, concentrations of sulfates, chlorides, and barium in nearby surface water when OSA is used in road construction.

  7. Constructive Conflict Resolution for Students with Behavioral Disorders.

    Science.gov (United States)

    Bullock, Cathy; Foegen, Anne

    2002-01-01

    This article describes the application of constructive conflict resolution techniques in a middle-school program for students with behavior disorders, discussing the use of mediation, negotiation, constructive controversy, and classroom meetings. Initial efforts to explore the impact of the program are recounted, and implications for implementing…

  8. Men's Adultery as Sickness: Metaphor, Gender Categories and the Discursive Construction of Gender Differences on Japanese Television Consultation Programs

    Science.gov (United States)

    Saft, Scott; Ohara, Yumiko

    2009-01-01

    This article describes how Japanese TV programs adopting a consultation framework construct different realities for women and men concerning a specific social phenomenon, namely adultery. To do so, two perspectives, the theory of metaphor promoted by George Lakoff and membership category analysis, are combined toward a discursive analysis which…

  9. Self-Observation and Peer Feedback as a Faculty Development Approach for Problem-Based Learning Tutors: A Program Evaluation.

    Science.gov (United States)

    Garcia, Irène; James, Richard W; Bischof, Paul; Baroffio, Anne

    2017-01-01

    Good teaching requires spontaneous, immediate, and appropriate action in response to various situations. It is even more crucial in problem-based learning (PBL) tutorials, as the tutors, while directing students toward the identification and attainment of learning objectives, must stimulate them to contribute to the process and provide them with constructive feedback. PBL tutors in medicine lack opportunities to receive feedback from their peers on their teaching strategies. Moreover, as tutorials provide little or no time to stop and think, more could be learned by reflecting on the experience than from the experience itself. We designed and evaluated a faculty development approach to developing PBL tutors that combined self-reflection and peer feedback processes, both powerful techniques for improving performance in education. We developed an observation instrument for PBL facilitation to be used both by tutors to self-observe and reflect on own teaching strategies and by peers to observe and provide feedback to tutors. Twenty PBL sessions were video-recorded. Tutors completed the instrument immediately after their PBL session and again while watching their video-recorded session (self-observation). A group of three observers completed the instrument while watching each recorded session and provided feedback to each tutor (peer observation and feedback). We investigated tutors' perceptions of the feasibility and acceptability of the approach and gathered data on its effectiveness in enhancing tutors' facilitation skills. The preclinical medical curriculum at the University of Geneva is essentially taught by PBL. A new program of faculty development based on self-observation and peer feedback was offered to voluntary tutors and evaluated. Our results suggest that self-observation and peer feedback, supported by an instrument, can be effective in enhancing tutors' facilitation skills. Reflection on self-observation raised teachers' awareness of the effectiveness of

  10. KASS v.2.2. scheduling software for construction

    OpenAIRE

    Krzemiński Michał

    2016-01-01

    The paper presents fourth version of specialist useful software in scheduling KASS v.2.2 (Algorithm Scheduling Krzeminski System). KASS software is designed for construction scheduling, specially form flow shop models. The program is being dedicated closely for the purposes of the construction. In distinguishing to other used programs in tasks of this type operational research criteria were designed closely with the thought about construction works and about the specificity of the building pr...

  11. Solid construction waste management in large civil construction companies through use of specific software - case study

    OpenAIRE

    Caio Dalla Zanna; Fernando Fernandes; José Carlos Gasparine

    2017-01-01

    In the current construction market there is a high demand for sustainability. In addition to that the Brazilian government is enacting tougher and tougher legislation on the disposal of solid construction waste. These demands increasingly make the construction company responsible for the entire lifecycle of its waste as well as the accompanying cost and environmental impact of solid waste. A software program was used in the research which allows construction companies gather information about...

  12. Fiscal year 1996 well installation program summary, Y-12 Plant Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1997-04-01

    This report summarizes the well installation activities conducted during the federal fiscal year (FY) 1996 drilling program at the Oak Ridge Y-12 Plant, Oak Ridge Tennessee. Synopses of monitoring well construction/well development data, well location rationale, geological/hydrological observations, quality assurance/quality control methods, and health and safety monitoring are included. Two groundwater monitoring wells were installed during the FY 1996 drilling program. One of the groundwater monitoring wells was installed in the Lake Reality area and was of polyvinyl chloride screened construction. The other well, installed near the Ash Disposal Basin, was of stainless steel construction

  13. Information management system for the analysis of the program of electric power transmission construction; Sistema gerencial de informacao para analise do programa de obras de transmissao

    Energy Technology Data Exchange (ETDEWEB)

    Peres, Luiz A. Pecorelli; Lima Junior, Moacir P.; Kayat, Julio; Berer, Ricardo; Sondermann, Luiz O. [FURNAS, Rio de Janeiro, RJ (Brazil)

    1993-12-31

    The management of an implementation and coordination program for electric power transmission lines construction needs to have access to up to date information in several areas. Aiming to attend these basic requisites a data base computer program was developed. This work describes such program 7 refs., 4 figs.

  14. Construction of a Family Quality of Life Support Program for families of young and adults with intellectual disability

    Directory of Open Access Journals (Sweden)

    Natxo MARTÍNEZ RUEDA

    2017-02-01

    Full Text Available This paper is grounded on current conceptions on Family Quality of Life (FQoL and family-centered intervention. It describes a part of the building process of a ‘Program for Supporting Family Quality of Life’, within the SAIOA-BBK frame a Gorabide’s information, guidance and support service for people with intellectual disability and their families. A major goal of this project is making proposals for professionals to fit the link between FQoL assessment and its improvement. The program was developed, constructed and tested through collaborative methods between professionals and university researchers, aiming to an increase of FQoL of families with sons or daughters among the youth and adulthood period. Program features, and how it was experimented in a pilot sample of families (n = 5 is presented.

  15. Reuse Tools to Support ADA Instantiation Construction

    Science.gov (United States)

    1990-06-01

    specification and body with embedded task shell instantiations, as well as an inter-task coordination procedure which controls task activation, execution, and...Tools to Support Ada Instantiation Construction 3 - Generalized Construction Approaches Page 39 4Automatic Programming Programmer’s Apprentice ~ASLs...which is the root of a frame hierarchy. The specification frame controls the hierarchy’s composition of the program and stores all its custom

  16. Learning sorting algorithms through visualization construction

    Science.gov (United States)

    Cetin, Ibrahim; Andrews-Larson, Christine

    2016-01-01

    Recent increased interest in computational thinking poses an important question to researchers: What are the best ways to teach fundamental computing concepts to students? Visualization is suggested as one way of supporting student learning. This mixed-method study aimed to (i) examine the effect of instruction in which students constructed visualizations on students' programming achievement and students' attitudes toward computer programming, and (ii) explore how this kind of instruction supports students' learning according to their self-reported experiences in the course. The study was conducted with 58 pre-service teachers who were enrolled in their second programming class. They expect to teach information technology and computing-related courses at the primary and secondary levels. An embedded experimental model was utilized as a research design. Students in the experimental group were given instruction that required students to construct visualizations related to sorting, whereas students in the control group viewed pre-made visualizations. After the instructional intervention, eight students from each group were selected for semi-structured interviews. The results showed that the intervention based on visualization construction resulted in significantly better acquisition of sorting concepts. However, there was no significant difference between the groups with respect to students' attitudes toward computer programming. Qualitative data analysis indicated that students in the experimental group constructed necessary abstractions through their engagement in visualization construction activities. The authors of this study argue that the students' active engagement in the visualization construction activities explains only one side of students' success. The other side can be explained through the instructional approach, constructionism in this case, used to design instruction. The conclusions and implications of this study can be used by researchers and

  17. Risk Management System and Project Staff Education Program for Overseas Construction Project Using the Expert System

    OpenAIRE

    Hirota, Yoichi

    2007-01-01

    The turnover of the Japanese contractors and the consulting firms has kept the same level since 1983, in spite of the fact that the size of domestic market is shrinking. This is why they do not have a proper management system, especially risk management system for the overseas construction projects. This study aims at building risk management system and developing education program that can be applied to reinforcing the ability, based on the author’s experience. Risk is defined as “uncertain ...

  18. Algorithms for computerized test construction using classical item parameters

    NARCIS (Netherlands)

    Adema, Jos J.; van der Linden, Willem J.

    1989-01-01

    Recently, linear programming models for test construction were developed. These models were based on the information function from item response theory. In this paper another approach is followed. Two 0-1 linear programming models for the construction of tests using classical item and test

  19. Solar variability observed through changes in solar figure and mean diameter

    International Nuclear Information System (INIS)

    Hill, H.A.; Bos, R.J.

    1982-01-01

    The objective of the project is to detect and monitor climatically significant solar variability by studying the associated variability in solar shape and diameter. The observing program for this project was initiated in 1981, as was the requisite data reduction. These two activities are conducted simultaneously. Theoretical work has also progressed on matters relevant to the interpretation of observed changes in the indirect diagnostics in terms of changes in the solar luminosity. The success of the observing program over long time periods depends in part on the development of a technique to calibrate the scale in the telescope field, and work on this has progressed to the design and construction phase. A proposal is made for the continuation of the work in each of these areas

  20. Developing construction labor through modular training

    International Nuclear Information System (INIS)

    Moody, J.R.; Amos, T.M. Jr.

    1976-01-01

    Traditionally, the construction industry has depended on apprenticeship, technical and vocational schools, and experience through informal on-the-job training to meet the industry's demands for skilled manpower. However, as increasingly larger heavy construction projects, such as nuclear power plants, have come to demand more and more skilled craftsmen, the traditional methods of developing construction labor have become insufficient both in terms of the number of workers made available and in the quality of their skills. Over the past eight years, Brown and Root, Inc., has developed a task oriented modular system for training construction workers which supplements a worker's on-the-job training and decreases the time it requires the individual to become a productive member of the project workforce in his work. This training approach is not a series of the semester-long courses which have typified apprenticeship and vocational training in the past, but a systems approach to designing and implementing a program of classroom modules for craft development programs which emphasize both the hands-on tasks a construction worker must perform in his craft as well as the related theory required. The system consists of a number of modular courses which can be sequenced, for each craft, to develop construction skills in each worker according to both his needs and the needs of the project. The training modules for a particular craft program are developed utilizing Instructional Systems Development (ISD). This process is divided into five major phases: analysis, establishment of objectives, preparation of tests, planning and developing instructional content, and evaluation

  1. Construction principles of prevention programs for adolescents

    Directory of Open Access Journals (Sweden)

    A.A. Bochaver

    2014-08-01

    Full Text Available We present the basic principles for the development of effective programs for prevention of substance abuse among young people employed in the United States. They are based on the model of “risk factors and protective factors” and suggest a consistent, systematic, coordinated deployment of preventive interventions for children of different ages and in different social contexts (individually, in family, at school, in community. These principles can be useful for transfer of foreign experience on the Russian reality and for development of a new generation of programs for the prevention of substance abuse in Russia. Also, these principles and ideas may be partly extrapolated to develop prevention programs for other social risks.

  2. "Oh God, She Is Looking at Every Little Thing I am Doing!" Student Teachers' Constructions of the Observation Experience

    Science.gov (United States)

    Fantozzi, Victoria B.

    2013-01-01

    This qualitative study examines the variance in the ways that four student teachers made meaning of the experience of being observed by their cooperating teachers and university supervisors. Using Kegan's (1994) theory of cognitive development, the study focuses on the differences in the ways the teacher candidates constructed the prospect of…

  3. A Study of the potency of construction service industries to support the first nuclear power plant construction in Indonesia

    International Nuclear Information System (INIS)

    Dharu Dewi; Sriyana

    2008-01-01

    The study was conducted to identify the potency of construction service industries to participate in nuclear power plant program in Indonesia. The potency is identified by evaluation results of national industries potency in some multinational construction service industries. The research methodology chosen was the survey method by sending questionnaires, visits to National industries, interview, and literature study. The data collection technique was sampling purposive. Data can be obtained from both primary and secondary data. The study results showed that the performance of construction service industries to support the NPP program must be increased through the selection of competent human resources, reliable equipment and an effective and efficient project management system, so that they can be expected to play necessary role in the nuclear power plant construction in Indonesia. (author)

  4. Programming

    International Nuclear Information System (INIS)

    Jackson, M.A.

    1982-01-01

    The programmer's task is often taken to be the construction of algorithms, expressed in hierarchical structures of procedures: this view underlies the majority of traditional programming languages, such as Fortran. A different view is appropriate to a wide class of problem, perhaps including some problems in High Energy Physics. The programmer's task is regarded as having three main stages: first, an explicit model is constructed of the reality with which the program is concerned; second, this model is elaborated to produce the required program outputs; third, the resulting program is transformed to run efficiently in the execution environment. The first two stages deal in network structures of sequential processes; only the third is concerned with procedure hierarchies. (orig.)

  5. Labor construction trends

    International Nuclear Information System (INIS)

    McCall, H.W.

    1976-01-01

    The increasing costs and schedule delays being experienced in construction projects have led companies to look for alternatives to their present methods of expansion. One of the facets being evaluated is the construction labor posture. As a result, more companies are employing open shop contractors. Certain benefits can be realized by open shop construction. Productivity, in terms of the time required and overall costs, is definitely improved at no sacrifice in quality. Before an owner decides to build a project open shop, however, he must be fully aware of the pro's and con's of both types of labor posture. He must know to select a capable open shop contractor and he must realize his obligations for a successful open shop program

  6. A software complex intended for constructing applied models and meta-models on the basis of mathematical programming principles

    Directory of Open Access Journals (Sweden)

    Михаил Юрьевич Чернышов

    2013-12-01

    Full Text Available A software complex (SC elaborated by the authors on the basis of the language LMPL and representing a software tool intended for synthesis of applied software models and meta-models constructed on the basis of mathematical programming (MP principles is described. LMPL provides for an explicit form of declarative representation of MP-models, presumes automatic constructing and transformation of models and the capability of adding external software packages. The following software versions of the SC have been implemented: 1 a SC intended for representing the process of choosing an optimal hydroelectric power plant model (on the principles of meta-modeling and 2 a SC intended for representing the logic-sense relations between the models of a set of discourse formations in the discourse meta-model.

  7. Visual Programming of Subsumption-Based Reactive Behaviour

    Directory of Open Access Journals (Sweden)

    Omid Banyasad

    2008-11-01

    Full Text Available General purpose visual programming languages (VPLs promote the construction of programs that are more comprehensible, robust, and maintainable by enabling programmers to directly observe and manipulate algorithms and data. However, they usually do not exploit the visual representation of entities in the problem domain, even if those entities and their interactions have obvious visual representations, as is the case in the robot control domain. We present a formal control model for autonomous robots, based on subsumption, and use it as the basis for a VPL in which reactive behaviour is programmed via interactions with a simulation.

  8. Lessons Learned from Past and Ongoing Construction Projects

    International Nuclear Information System (INIS)

    Tabatabai, Omid

    2011-01-01

    Full text of publication follows: The nuclear industry in the U.S. faced many construction quality and design issues in the 1970's and 1980's. In 1984, the NRC issued NUREG-1055, 'Improving Quality and the Assurance of Quality in the Design and Construction of Nuclear Power Plants,' to document the lessons learned from nuclear power plant (NPP) construction in the U.S. In recent years, several countries have begun either planning for or actually constructing new NPPs. For instance, in the U.S., the nuclear industry has submitted several combined license and design certification applications to the NRC for licensing reviews and approval to build 30+ new NPP units. Latest construction experience from countries that are currently building new NPPs indicate that these countries are dealing with challenges that are similar to those issues that caused major quality assurance problems, delays, or even termination of several projects in U.S. in the 70's and 80's. The U.S. NRC is pro-actively taking measures to improve its regulatory programs as well as construction oversight activities before new NPPs construction begin in the U.S. In late 2007, the U.S. NRC's Office of New Reactors established a construction experience program (ConE) to obtain and evaluate construction and operating experience events and to identify the lessons learned from these events. In March 2009, the NRC published an Office Instruction to provide a process for incorporating the lessons learned and insights from the design, construction, and operation of the international and domestic NPPs into the licensing reviews, inspections, and construction of new reactors in the U.S. Additionally, the ConE program staff developed a Web-enabled database to store, manage, and make construction experience information available to all NRC technical reviewers as well as inspectors. Because this database contains information from other countries' regulators that are considered

  9. Construction program for a large superconducting MHD magnet system at the coal-fired flow facility

    International Nuclear Information System (INIS)

    Wang, S.T.; Genens, L.; Gonczy, J.; Ludwig, H.; Lieberg, M.; Kraft, E.; Gacek, D.; Huang, Y.C.; Chen, C.J.

    1980-01-01

    The Argonne National Laboratory has designed and is constructing a 6 T large aperture superconducting MHD magnet for use in the Coal-Fired Flow Facility (CFFF) at the University of Tennessee Space Institute (UTSI) at Tullahoma, Tennessee. The magnet system consists of the superconducting magnet, a magnet power supply, an integrated instrumentation for operation, control and protection, and a complete cryogenic facility including a CTI Model 2800 helium refrigerator/liquefier with two compressors, helium gas handling system and a 7500 liter liquid helium dewar. The complete system will be tested at Argonne, IL in 1981. The magnet design is reviewed, and the coil fabrication programs are described in detail

  10. Modular construction approach for advanced nuclear plants

    International Nuclear Information System (INIS)

    Johnson, F.T.; Orr, R.S.; Boudreaux, C.P.

    1988-01-01

    Modular construction has been designated as one of the major features of the AP600 program, a small innovative 600-MW (electric) advanced light water reactor (ALWR) that is currently being developed by Westinghouse and its subcontractors. This program is sponsored by the US Department of Energy (DOE) in conjunction with several other DOE and Electric Power Research Institute ALWR programs. Two major objectives of the AP600 program are as follows: (1) to provide a cost of power competitive with other power generation alternatives; and (2) to provide a short construction schedule that can be met with a high degree of certainty. The AP600 plant addresses these objectives by providing a simplified plant design and an optimized plant arrangement that result in a significant reduction in the number and size of systems and components, minimizes the overall building volumes, and consequently reduces the required bulk quantities. However, only by adopting a modular construction approach for the AP600 can the full cost and schedule benefits be realized from the advances made in the plant systems design and plant arrangement. Modularization is instrumental in achieving both of the above objectives, but most of all, a total modularization approach is considered absolutely essential to ensure that an aggressive construction schedule can be met with a high degree of certainty

  11. Constructed-Response Matching to Sample and Spelling Instruction.

    Science.gov (United States)

    Dube, William V.; And Others

    1991-01-01

    This paper describes a computer-based spelling program grounded in programed instructional techniques and using constructed-response matching-to-sample procedures. Following use of the program, two mentally retarded men successfully spelled previously misspelled words. (JDD)

  12. Performance measures in the earth observations commercialization applications program

    Science.gov (United States)

    Macauley, Molly K.

    1996-03-01

    Performance measures in the Earth Observations Commercialization Application Program (EOCAP) are key to its success and include net profitability; enhancements to industry productivity through generic innovations in industry practices, standards, and protocols; and documented contributions to public policy governing the newly developing remote sensing industry. Because EOCAP requires company co-funding, both parties to the agreement (the government and the corporate partner) have incentives to pursue these goals. Further strengthening progress towards these goals are requirements for business plans in the company's EOCAP proposal, detailed scrutiny given these plans during proposal selection, and regularly documented progress reports during project implementation.

  13. The VLBA-BU-BLAZAR Multi-Wavelength Monitoring Program

    Directory of Open Access Journals (Sweden)

    Svetlana Jorstad

    2016-10-01

    Full Text Available We describe a multiwavelength program of monitoring of a sample of bright γ-ray blazars, which the Boston University (BU group has being carrying out since June 2007. The program includes monthly monitoring with the Very Long Baseline Array at 43 GHz, optical photometric and polarimetric observations, construction and analysis of UV and X-ray light curves obtained with the Rossi X-ray Timing Explorer (RXTE and Swift satellites, and construction and analysis of γ-ray light curves based on data provided by the Large Area Telescope of the Fermi Gamma-ray Space Telescope. We present general results about the kinematics of parsec-scale radio jets, as well as the connection between γ-ray outbursts and jet events.

  14. Construction quality assurance report

    International Nuclear Information System (INIS)

    Roscha, V.

    1994-01-01

    This report provides a summary of the construction quality assurance (CQA) observation and test results, including: The results of the geosynthetic and soil materials conformance testing. The observation and testing results associates with the installation of the soil liners. The observation and testing results associated with the installation of the HDPE geomembrane liner systems. The observation and testing results associated with the installation of the leachate collection and removal systems. The observation and testing results associated with the installation of the working surfaces. The observation and testing results associated with in-plant manufacturing process. Summary of submittal reviews by Golder Construction Services, Inc. The submittal and certification of the piping material specifications. The observation and verification associated of the Acceptance Test Procedure results of the operational equipment functions. Summary of the ECNs which are incorporated into the project

  15. Programming

    OpenAIRE

    Jackson, M A

    1982-01-01

    The programmer's task is often taken to be the construction of algorithms, expressed in hierarchical structures of procedures: this view underlies the majority of traditional programming languages, such as Fortran. A different view is appropriate to a wide class of problem, perhaps including some problems in High Energy Physics. The programmer's task is regarded as having three main stages: first, an explicit model is constructed of the reality with which the program is concerned; second, thi...

  16. Effect of STOP technique on safety climate in a construction company.

    Science.gov (United States)

    Darvishi, Ebrahim; Maleki, Afshin; Dehestaniathar, Saeed; Ebrahemzadih, Mehrzad

    2015-01-01

    Safety programs are a core part of safety management in workplaces that can reduce incidents and injuries. The aim of this study was to investigate the influence of Safety Training Observation Program (STOP) technique as a behavior modification program on safety climate in a construction company. This cross-sectional study was carried out on workers of the Petrochemical Construction Company, western Iran. In order to improve safety climate, an unsafe behavior modification program entitled STOP was launched among workers of project during 12 months from April 2013 and April 2014. The STOP technique effectiveness in creating a positive safety climate was evaluated using the Safety Climate Assessment Toolkit. 76.78% of total behaviors were unsafe. 54.76% of total unsafe acts/ at-risk behaviors were related to the fall hazard. The most cause of unsafe behaviors was associated with habit and unavailability of safety equipment. After 12 month of continuous implementation the STOP technique, 55.8% of unsafe behaviors reduced among workers. The average score of safety climate evaluated using of the Toolkit, before and after the implementation of the STOP technique was 5.77 and 7.24, respectively. The STOP technique can be considered as effective approach for eliminating at-risk behavior, reinforcing safe work practices, and creating a positive safety climate in order to reduction incidents/injuries.

  17. Review of the severe accident risk reduction program (SARRP) containment event trees

    International Nuclear Information System (INIS)

    1986-05-01

    A part of the Severe Accident Risk Reduction Program, researchers at Sandia National Laboratories have constructed a group of containment event trees to be used in the analysis of key accident sequences for light water reactors (LWR) during postulated severe accidents. The ultimate goal of the program is to provide to the NRC staff a current assessment of the risk from severe reactor accidents for a group of five light water reactors. This review specifically focuses on the development and construction of the containment event trees and the results for containment failure probability, modes and timing. The report first gives the background on the program, the review criteria, and a summary of the observations, findings and recommendations. secondly, the individual reviews of each committee member on the event trees is presented. Finally, a review is provided on the computer model used to construct and evaluate the event trees

  18. 43 CFR 12.830 - Buy American Act-Construction materials.

    Science.gov (United States)

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Buy American Act-Construction materials... Assistance Programs Buy American Act-Construction Materials § 12.830 Buy American Act—Construction materials...—Construction Materials (a) The Buy American Act (41 U.S.C. 10) provides that the Government give preference to...

  19. Examining construct validity of a new naturalistic observational assessment of hand skills for preschool- and school-age children.

    Science.gov (United States)

    Chien, Chi-Wen; Brown, Ted; McDonald, Rachael

    2012-04-01

    The Assessment of Children's Hand Skills is a new assessment that utilises a naturalistic observational method to capture children's real-life hand skill performance when engaged at various types of daily activities in everyday living contexts. The Assessment of Children's Hand Skills is designed for use with 2- to 12-year-old children with a range of disabilities or health conditions. The study aimed to investigate construct validity of the Assessment of Children's Hand Skills in Australian children. Rasch analysis was used to examine internal construct validity of the Assessment of Children's Hand Skills in a mixed sample of 53 children with disabilities (including autism spectrum disorder, developmental/genetic disorders and physical disabilities) and 85 typically developing children. External construct validity was examined by correlating with three questionnaires evaluating daily living skills and hand skills. Rasch goodness-of-fit analysis suggested that all 22 activity items and 19 of 20 hand skill items in the Assessment of Children's Hand Skills measured a single construct. The Assessment of Children's Hand Skills items were placed in a clinically meaningful hierarchy from easy to hard, and the difficulty range of the items also matched the majority of children with disabilities and typically developing preschool-aged children. Moderate to high correlations (0.59 ≤ Spearman's ρ coefficients ≤ 0.89, P assessments of daily living and fine motor skills. This study provided preliminary evidence supporting the construct validity of the Assessment of Children's Hand Skills for its clinical application in assessing children's real-life hand skill performance in Australian contexts. © 2012 The Authors Australian Occupational Therapy Journal © 2012 Occupational Therapy Australia.

  20. Quality control during construction of power plants

    International Nuclear Information System (INIS)

    Hartstern, R.F.

    1982-01-01

    This paper traces the background and examines the necessity for a program to control quality during the construction phase of a power plant. It also attempts to point out considerations for making these programs cost effective

  1. The "Quasar" Network Observations in e-VLBI Mode Within the Russian Domestic VLBI Programs

    Science.gov (United States)

    Finkelstein, Andrey; Ipatov, Alexander; Kaidanovsky, Michael; Bezrukov, Ilia; Mikhailov, Andrey; Salnikov, Alexander; Surkis, Igor; Skurikhina, Elena

    2010-01-01

    The purpose of the Russian VLBI "Quasar" Network is to carry out astrometrical and geodynamical investigations. Since 2006 purely domestic observational programs with data processing at the IAA correlator have been carried out. To maintain these geodynamical programs e-VLBI technology is being developed and tested. This paper describes the IAA activity of developing a real-time VLBI system using high-speed digital communication links.

  2. Programming by Numbers -- A Programming Method for Complete Novices

    NARCIS (Netherlands)

    Glaser, Hugh; Hartel, Pieter H.

    2000-01-01

    Students often have difficulty with the minutiae of program construction. We introduce the idea of `Programming by Numbers', which breaks some of the programming process down into smaller steps, giving such students a way into the process of Programming in the Small. Programming by Numbers does not

  3. Death education for oncology professionals: a personal construct theory perspective.

    Science.gov (United States)

    Rainey, L C

    1983-01-01

    Using observations from a psychosocial training program for oncology professionals, this article illustrates how one can model, while training the student, the very methods he or she can adopt in working with patients and families. One starts with an elicitation of the student's (patient's) operative personal constructs and then devises strategies to elaborate, integrate, loosen, tighten, preempt, or take other action, as needed. The very means used to promote movement within the student's own death-related constructs can be adopted for use by him or her in the clinical situation. As the helper's pathways of action and thought with regard to this domain become more comprehensive and as the helper becomes more skilled at moving freely along them, he or she becomes more perceptive and resourceful to those in need.

  4. The network construction of CSELF for earthquake monitoring and its preliminary observation

    Science.gov (United States)

    Tang, J.; Zhao, G.; Chen, X.; Bing, H.; Wang, L.; Zhan, Y.; Xiao, Q.; Dong, Z.

    2017-12-01

    The Electromagnetic (EM) anomaly in short-term earthquake precursory is most sensitive physical phenomena. Scientists believe that EM monitoring for earthquake is one of the most promising means of forecasting. However, existing ground-base EM observation confronted with increasing impact cultural noises, and the lack of a frequency range of higher than 1Hz observations. Control source of extremely low frequency (CSELF) EM is a kind of good prospective new approach. It not only has many advantages with high S/N ratio, large coverage area, probing depth ect., thereby facilitating the identification and capture anomaly signal, and it also can be used to study the electromagnetic field variation and to study the crustal medium changes of the electric structure.The first CSELF EM network for earthquake precursory monitoring with 30 observatories in China has been constructed. The observatories distribute in Beijing surrounding area and in the southern part of North-South Seismic Zone. GMS-07 system made by Metronix is equipped at each station. The observation mixed CSELF and nature source, that is, if during the control source is off transmitted, the nature source EM signal will be recorded. In genernal, there are 3 5 frequencies signals in the 0.1-300Hz frequency band will be transmit in every morning and evening in a fixed time (length 2 hours). Besides time, natural field to extend the frequency band (0.001 1000 Hz) will be observed by using 3 sample frequencies, 4096Hz sampling rate for HF, 256Hz for MF and 16Hz for LF. The low frequency band records continuously all-day and the high and medium frequency band use a slices record, the data records by cycling acquisition in every 10 minutes with length of about 4 to 8 seconds and 64 to 128 seconds , respectively. All the data is automatically processed by server installed in the observatory. The EDI file including EM field spectrums and MT responses and time series files will be sent the data center by internet

  5. Environmental management systems - before, during and after construction

    International Nuclear Information System (INIS)

    Braun, T.L.

    1997-01-01

    The purpose of this paper is to describe an operational environmental managment system (EMS) as developed by TransCanada PipeLines, including an example of the application and concomitant benefits. The focus will be on the planning, construction, inspection and post-construction monitoring programs, covering approximately 3,190 kilometers of large diameter pipeline constructed between 1990 and 1996, across a wide range of Canadian land-uses and ecosystems. With the implementation of such systems, governments have recognized that corporate responsibility and self-management on environmental matters can result in effective, environmentally sound programs that minimize impacts and allow for a more cost-effective and streamlined regulatory approach. (au)

  6. TPX tokamak construction management

    International Nuclear Information System (INIS)

    Knutson, D.; Kungl, D.; Seidel, P.; Halfast, C.

    1995-01-01

    A construction management contract normally involves the acquisition of a construction management firm to assist in the design, planning, budget conformance, and coordination of the construction effort. In addition the construction management firm acts as an agent in the awarding of lower tier contracts. The TPX Tokamak Construction Management (TCM) approach differs in that the construction management firm is also directly responsible for the assembly and installation of the tokamak including the design and fabrication of all tooling required for assembly. The Systems Integration Support (SIS) contractor is responsible for the architect-engineering design of ancillary systems, such as heating and cooling, buildings, modifications and site improvements, and a variety of electrical requirements, including switchyards and >4kV power distribution. The TCM will be responsible for the procurement of materials and the installation of the ancillary systems, which can either be performed directly by the TCM or subcontracted to a lower tier subcontractor. Assurance that the TPX tokamak is properly assembled and ready for operation when turned over to the operations team is the primary focus of the construction management effort. To accomplish this a disciplined constructability program will be instituted. The constructability effort will involve the effective and timely integration of construction expertise into the planning, component design, and field operations. Although individual component design groups will provide liaison during the machine assembly operations, the construction management team is responsible for assembly

  7. Programming language structures

    CERN Document Server

    Organick, Elliott Irving; Plummer, Robert P

    1978-01-01

    Programming Language Structures deals with the structures of programming languages and introduces the reader to five important programming languages: Algol, Fortran, Lisp, Snobol, and Pascal. The fundamental similarities and differences among these languages are discussed. A unifying framework is constructed that can be used to study the structure of other languages, such as Cobol, PL/I, and APL. Several of the tools and methodologies needed to construct large programs are also considered.Comprised of 10 chapters, this book begins with a summary of the relevant concepts and principles about al

  8. OBSERVATIONS OF THE WASP-2 SYSTEM BY THE APOSTLE PROGRAM

    Energy Technology Data Exchange (ETDEWEB)

    Becker, Andrew C.; Kundurthy, Praveen; Agol, Eric; Barnes, Rory; Williams, Benjamin F.; Rose, Amy E. [Astronomy Department, University of Washington, Seattle, WA 98195 (United States)

    2013-02-10

    We present transit observations of the WASP-2 exoplanet system by the Apache Point Survey of Transit Lightcurves of Exoplanets (APOSTLE) program. Model fitting to these data allows us to improve measurements of the hot-Jupiter exoplanet WASP-2b and its orbital parameters by a factor of {approx}2 over prior studies; we do not find evidence for transit depth variations. We do find reduced {chi}{sup 2} values greater than 1.0 in the observed minus computed transit times. A sinusoidal fit to the residuals yields a timing semi-amplitude of 32 s and a period of 389 days. However, random rearrangements of the data provide similar quality fits, and we cannot with certainty ascribe the timing variations to mutual exoplanet interactions. This inconclusive result is consistent with the lack of incontrovertible transit timing variations (TTVs) observed in other hot-Jupiter systems. This outcome emphasizes that unique recognition of TTVs requires dense sampling of the libration cycle (e.g., continuous observations from space-based platforms). However, even in systems observed with the Kepler spacecraft, there is a noted lack of transiting companions and TTVs in hot-Jupiter systems. This result is more meaningful, and indicates that hot-Jupiter systems, while they are easily observable from the ground, do not appear to be currently configured in a manner favorable to the detection of TTVs. The future of ground-based TTV studies may reside in resolving secular trends, and/or implementation at extreme quality observing sites to minimize atmospheric red noise.

  9. An ethnographic study of the construction of science on television

    Science.gov (United States)

    Dhingra, Koshi

    1999-10-01

    The medium of television is an important manifestation of popular culture. Television stories and images frequently represent the position occupied by science and scientists in society. This study focuses on three questions. First, what is the form and content of the science that is constructed on television programs in which high school students see science? Second, how do television practitioners who deal with science approach and think about their work? Third, in what ways do high school students appropriate the science in these programs? Ethnographic methods, which did not include the technique of participant observation, were used to address these questions. Two types of text provided the basis for ethnographic analysis. First, text whose production was beyond the control of the researcher was used in the form of approximately 10 hours of programming, which included both fictional and non-fictional genres. Selection was based upon the results of questionnaires, in which students were asked to list those programs in which they saw the most science together with their reasons for each choice. Second, text whose production was somewhat within my control as researcher was used in the form of transcripts of interviews with television practitioners and students. In addition, written responses to the researcher's questions and transcripts of student discussion groups are texts that fall into this second category. The findings point to the centrality of the notion of the nature of science, which is constructed by a variety of factors. These include, first, story---representing events, people and the process of science on television. Story is shaped by plot, discourse, characters and genre. Second, images work to construct a nature of science and, in turn, constitute choices made about the composition, sequence and duration of shots. Third, who the television practitioners who produce a program are in conjunction with the culture of the institution they work for

  10. Programs as Polypeptides.

    Science.gov (United States)

    Williams, Lance R

    2016-01-01

    Object-oriented combinator chemistry (OOCC) is an artificial chemistry with composition devices borrowed from object-oriented and functional programming languages. Actors in OOCC are embedded in space and subject to diffusion; since they are neither created nor destroyed, their mass is conserved. Actors use programs constructed from combinators to asynchronously update their own states and the states of other actors in their neighborhoods. The fact that programs and combinators are themselves reified as actors makes it possible to build programs that build programs from combinators of a few primitive types using asynchronous spatial processes that resemble chemistry as much as computation. To demonstrate this, OOCC is used to define a parallel, asynchronous, spatially distributed self-replicating system modeled in part on the living cell. Since interactions among its parts result in the construction of more of these same parts, the system is strongly constructive. The system's high normalized complexity is contrasted with that of a simple composome.

  11. A comparative study of faecal occult blood kits in a colorectal cancer screening program in a cohort of healthy construction workers.

    LENUS (Irish Health Repository)

    Shuhaibar, M

    2012-02-01

    BACKGROUND: The incidence of colorectal cancer (CRC) has been increasing. We evaluated uptake rates and outcomes of faecal immunochemical test (FIT) and Guaiac test (gFOBT) kits as part of a two-step CRC screening. METHODS: A 3-year CRC screening program for a defined population of construction workers was conducted. Those satisfying the inclusion criteria were provided with gFOBT or FIT kits. Individuals testing positive were invited for a colonoscopy. RESULTS: A total of 909 faecal testing kits were distributed. Age range was 53-60 years. Compliance rate was higher for FIT (58.3%) as compared to gFOBT (46.7%) (p = 0.0006). FIT detected adenomatous polyps and CRC in 37.5 and 25%, respectively, whereas; gFOBT detected 23.5 and 18%. Colonoscopies were normal in 53 and 25% tested positive by gFOBT and FIT, respectively (p = 0.016). CONCLUSION: The FIT was more cost-effective when compared with gFOBT with higher return rate, sensitivity and specificity. A comparative study of faecal occult blood kits in a CRC screening program in a healthy cohort of construction workers.

  12. Functional Programming

    OpenAIRE

    Chitil, Olaf

    2009-01-01

    Functional programming is a programming paradigm like object-oriented programming and logic programming. Functional programming comprises both a specific programming style and a class of programming languages that encourage and support this programming style. Functional programming enables the programmer to describe an algorithm on a high-level, in terms of the problem domain, without having to deal with machine-related details. A program is constructed from functions that only map inputs to ...

  13. 48 CFR 25.204 - Evaluating offers of foreign construction material.

    Science.gov (United States)

    2010-10-01

    ... foreign construction material. 25.204 Section 25.204 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Buy American Act-Construction Materials 25.204 Evaluating offers of foreign construction material. (a) Offerors proposing to use foreign...

  14. 48 CFR 1325.204 - Evaluating offers of foreign construction material.

    Science.gov (United States)

    2010-10-01

    ... foreign construction material. 1325.204 Section 1325.204 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Buy American Act-Construction Materials 1325.204 Evaluating offers of foreign construction material. The designee authorized to specify a...

  15. Technology programs in support of advanced light water reactor plants: Construction

    International Nuclear Information System (INIS)

    Eichen, E.P.

    1989-10-01

    Stone ampersand Webster Engineering Corporation (SWEC) is conducting several independent, yet interrelated, studies of light water reactor plants to improve constructibility and quality, to reduce costs and schedule duration, and to simplify design. This document discusses construction approaches. 77 refs., 5 figs., 6 tabs

  16. On how to do construction management communications engineering

    Institute of Scientific and Technical Information of China (English)

    Zhang Zhi

    2014-01-01

    In the communication construction projects, improving the efectivenes of project management is an important part of the quality asurance program. The efectivenes of the communication and construction project management is afected by many factors. Therefore, the discusion of communication construction project management efectivenes is good for improving the quality of projects of great significance. This paper analyzes the characteristics and problems of communication construction projects, reflecting the importance of project management; then discused the factors afecting the efectivenes of project management; finaly targeted to improve the communication of construction project management efectivenes propose specific methods to ensure communication quality of construction projects.

  17. Detection and plant monitoring programs: lessons from an intensive survey of Asclepias meadii with five observers.

    Directory of Open Access Journals (Sweden)

    Helen M Alexander

    Full Text Available Monitoring programs, where numbers of individuals are followed through time, are central to conservation. Although incomplete detection is expected with wildlife surveys, this topic is rarely considered with plants. However, if plants are missed in surveys, raw count data can lead to biased estimates of population abundance and vital rates. To illustrate, we had five independent observers survey patches of the rare plant Asclepias meadii at two prairie sites. We analyzed data with two mark-recapture approaches. Using the program CAPTURE, the estimated number of patches equaled the detected number for a burned site, but exceeded detected numbers by 28% for an unburned site. Analyses of detected patches using Huggins models revealed important effects of observer, patch state (flowering/nonflowering, and patch size (number of stems on probabilities of detection. Although some results were expected (i.e. greater detection of flowering than nonflowering patches, the importance of our approach is the ability to quantify the magnitude of detection problems. We also evaluated the degree to which increased observer numbers improved detection: smaller groups (3-4 observers generally found 90 - 99% of the patches found by all five people, but pairs of observers or single observers had high error and detection depended on which individuals were involved. We conclude that an intensive study at the start of a long-term monitoring study provides essential information about probabilities of detection and what factors cause plants to be missed. This information can guide development of monitoring programs.

  18. Detection and plant monitoring programs: lessons from an intensive survey of Asclepias meadii with five observers.

    Science.gov (United States)

    Alexander, Helen M; Reed, Aaron W; Kettle, W Dean; Slade, Norman A; Bodbyl Roels, Sarah A; Collins, Cathy D; Salisbury, Vaughn

    2012-01-01

    Monitoring programs, where numbers of individuals are followed through time, are central to conservation. Although incomplete detection is expected with wildlife surveys, this topic is rarely considered with plants. However, if plants are missed in surveys, raw count data can lead to biased estimates of population abundance and vital rates. To illustrate, we had five independent observers survey patches of the rare plant Asclepias meadii at two prairie sites. We analyzed data with two mark-recapture approaches. Using the program CAPTURE, the estimated number of patches equaled the detected number for a burned site, but exceeded detected numbers by 28% for an unburned site. Analyses of detected patches using Huggins models revealed important effects of observer, patch state (flowering/nonflowering), and patch size (number of stems) on probabilities of detection. Although some results were expected (i.e. greater detection of flowering than nonflowering patches), the importance of our approach is the ability to quantify the magnitude of detection problems. We also evaluated the degree to which increased observer numbers improved detection: smaller groups (3-4 observers) generally found 90 - 99% of the patches found by all five people, but pairs of observers or single observers had high error and detection depended on which individuals were involved. We conclude that an intensive study at the start of a long-term monitoring study provides essential information about probabilities of detection and what factors cause plants to be missed. This information can guide development of monitoring programs.

  19. Technology programs in support of advanced light water reactor plants: Construction

    International Nuclear Information System (INIS)

    Eichen, E.P.

    1987-12-01

    Stone ampersand Webster Engineering Corporation (SWEC) is conducting several independent, yet interrelated, studies of light water reactor plants to improve constructibility and quality, to reduce costs and schedule durations, and to simplify design. This document discusses successes and problems in construction. 49 refs., 16 figs., 8 tabs

  20. The Australian Geodetic Observing Program. Current Status and Future Plans

    Science.gov (United States)

    Johnston, G.; Dawson, J. H.

    2015-12-01

    Over the last decade, the Australian government has through programs like AuScope, the Asia Pacific Reference Frame (APREF), and the Pacific Sea Level Monitoring (PSLM) Project made a significant contribution to the Global Geodetic Observing Program. In addition to supporting the national research priorities, this contribution is justified by Australia's growing economic dependence on precise positioning to underpin efficient transportation, geospatial data management, and industrial automation (e.g., robotic mining and precision agriculture) and the consequent need for the government to guarantee provision of precise positioning products to the Australian community. It is also well recognised within Australia that there is an opportunity to exploit our near unique position as being one of the few regions in the world to see all new and emerging satellite navigation systems including Galileo (Europe), GPS III (USA), GLONASS (Russia), Beidou (China), QZSS (Japan) and IRNSS (India). It is in this context that the Australian geodetic program will build on earlier efforts and further develop its key geodetic capabilities. This will include the creation of an independent GNSS analysis capability that will enable Australia to contribute to the International GNSS Service (IGS) and an upgrade of key geodetic infrastructure including the national VLBI and GNSS arrays. This presentation will overview the significant geodetic activities undertaken by the Australian government and highlight its future plans.

  1. Politica de las Construcciones Escolares (Policy for School Construction).

    Science.gov (United States)

    Storni, Adolfo Enrique, Ed.; And Others

    This document establishes the policy for school construction programs and projects to be conducted in Argentina. The first part establishes the bases for construction and defines the policy and its objectives. The second part discusses school construction in view of educational reform and planning and considers analysis of current systems,…

  2. 34 CFR 76.600 - Where to find construction regulations.

    Science.gov (United States)

    2010-07-01

    ... 34 Education 1 2010-07-01 2010-07-01 false Where to find construction regulations. 76.600 Section 76.600 Education Office of the Secretary, Department of Education STATE-ADMINISTERED PROGRAMS What Conditions Must Be Met by the State and Its Subgrantees? Construction § 76.600 Where to find construction...

  3. An Approach to Effortless Construction of Program Animations

    Science.gov (United States)

    Velazquez-Iturbide, J. Angel; Pareja-Flores, Cristobal; Urquiza-Fuentes, Jaime

    2008-01-01

    Program animation systems have not been as widely adopted by computer science educators as we might expect from the firm belief that they can help in enhancing computer science education. One of the most notable obstacles to their adoption is the considerable effort that the production of program animations represents for the instructor. We…

  4. Towards a Competency-based Vision for Construction Safety Education

    Science.gov (United States)

    Pedro, Akeem; Hai Chien, Pham; Park, Chan Sik

    2018-04-01

    Accidents still prevail in the construction industry, resulting in injuries and fatalities all over the world. Educational programs in construction should deliver safety knowledge and skills to students who will become responsible for ensuring safe construction work environments in the future. However, there is a gap between the competencies current pedagogical approaches target, and those required for safety in practice. This study contributes to addressing this issue in three steps. Firstly, a vision for competency-based construction safety education is conceived. Building upon this, a research scheme to achieve the vision is developed, and the first step of the scheme is initiated in this study. The critical competencies required for safety education are investigated through analyses of literature, and confirmed through surveys with construction and safety management professionals. Results from the study would be useful in establishing and orienting education programs towards current industry safety needs and requirements

  5. Towards the use of knotworking for increasing innovation in construction projects

    DEFF Research Database (Denmark)

    Klitgaard, Anne; Beck, Frederikke; Andersen, Michael

    2017-01-01

    Knotworking is an emerging collaboration form in the built environment, which promises to encourage innovation at Construction project level. This study of knotworking processes is part of a larger research program about collaboration in the built environment. In this study of Knotworking......, the focus has been on how the participating organizations and professionals can learn how to participate in knotworking. A facilitator was introduced to establish how facilitators can assist the participating organizations in a construction project to learn to produce knowledge and innovation through...... knotworking. The theoretical foundation is Activity Theory, the data collection method derives from applied ethnomethodology using a blend of video recording and participant observation. The data has been collected in a series of planning meetings and one workshop about building a new kindergarten...

  6. Methodology for the interactive graphic simulator construction

    International Nuclear Information System (INIS)

    Milian S, Idalmis; Rodriguez M, Lazaro; Lopez V, Miguel A.

    1997-01-01

    The PC-supported Interactive Graphic Simulators (IGS) have successfully been used for industrial training programs in many countries. This paper is intended to illustrate the general methodology applied by our research team for the construction of this kind of conceptual or small scale simulators. The information and tools available to achieve this goal are also described. The applicability of the present methodology was confirmed with the construction of a set of IGS for nuclear power plants operators training programs in Cuba. One of them, relating reactor kinetics, is shown and briefly described in this paper. (author). 11 refs., 3 figs

  7. Assessment of modular construction for safety-related structures at advanced nuclear power plants

    International Nuclear Information System (INIS)

    Braverman, J.; Morante, R.; Hofmayer, C.

    1997-03-01

    Modular construction techniques have been successfully used in a number of industries, both domestically and internationally. Recently, the use of structural modules has been proposed for advanced nuclear power plants. The objective in utilizing modular construction is to reduce the construction schedule, reduce construction costs, and improve the quality of construction. This report documents the results of a program which evaluated the proposed use of modular construction for safety-related structures in advanced nuclear power plant designs. The program included review of current modular construction technology, development of licensing review criteria for modular construction, and initial validation of currently available analytical techniques applied to concrete-filled steel structural modules. The program was conducted in three phases. The objective of the first phase was to identify the technical issues and the need for further study in order to support NRC licensing review activities. The two key findings were the need for supplementary review criteria to augment the Standard Review Plan and the need for verified design/analysis methodology for unique types of modules, such as the concrete-filled steel module. In the second phase of this program, Modular Construction Review Criteria were developed to provide guidance for licensing reviews. In the third phase, an analysis effort was conducted to determine if currently available finite element analysis techniques can be used to predict the response of concrete-filled steel modules

  8. 48 CFR 625.204 - Evaluating offers of foreign construction material.

    Science.gov (United States)

    2010-10-01

    ... foreign construction material. 625.204 Section 625.204 Federal Acquisition Regulations System DEPARTMENT OF STATE SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Buy American Act-Construction Materials 625.204 Evaluating offers of foreign construction material. (b) The head of the contracting activity is the agency...

  9. Programming with Intervals

    Science.gov (United States)

    Matsakis, Nicholas D.; Gross, Thomas R.

    Intervals are a new, higher-level primitive for parallel programming with which programmers directly construct the program schedule. Programs using intervals can be statically analyzed to ensure that they do not deadlock or contain data races. In this paper, we demonstrate the flexibility of intervals by showing how to use them to emulate common parallel control-flow constructs like barriers and signals, as well as higher-level patterns such as bounded-buffer producer-consumer. We have implemented intervals as a publicly available library for Java and Scala.

  10. Recognition of Values-Based Constructs in a Summer Physical Activity Program.

    Science.gov (United States)

    Watson, Doris L.; Newton, Maria; Kim, Mi-Sook

    2003-01-01

    Examined the extent to which participants in a summer sports camp embraced values-based constructs, noting the relationship between perceptions of values-based constructs and affect and attitude. Data on ethnically diverse 10-13-year-olds indicated that care for others/goal setting, self-responsibility, and self-control/respect positively related…

  11. Handbook of energy use for building construction

    Energy Technology Data Exchange (ETDEWEB)

    Stein, R.G.; Stein, C.; Buckley, M.; Green, M.

    1980-03-01

    The construction industry accounts for over 11.14% of the total energy consumed in the US annually. This represents the equivalent energy value of 1 1/4 billion barrels of oil. Within the construction industry, new building construction accounts for 5.19% of national annual energy consumption. The remaining 5.95% is distributed among new nonbuilding construction (highways, ralroads, dams, bridges, etc.), building maintenance construction, and nonbuilding maintenance construction. The handbook focuses on new building construction; however, some information for the other parts of the construction industry is also included. The handbook provides building designers with information to determine the energy required for buildings construction and evaluates the energy required for alternative materials, assemblies, and methods. The handbook is also applicable to large-scale planning and policy determination in that it provides the means to estimate the energy required to carry out major building programs.

  12. Handbook of energy use for building construction

    Science.gov (United States)

    Stein, R. G.; Stein, C.; Buckley, M.; Green, M.

    1980-03-01

    The construction industry accounts for over 11.14% of the total energy consumed in the US annually. This represents the equivalent energy value of 1 1/4 billion barrels of oil. Within the construction industry, new building construction accounts for 5.19% of national annual energy consumption. The remaining 5.95% is distributed among new nonbuilding construction (highways, railroads, dams, bridges, etc.), building maintenance construction, and nonbuilding maintenance construction. Emphasis is given to new building construction; however, some information for the other parts of the construction industry is also included. Building designers are provided with information to determine the energy required for buildings construction and to evaluate the energy required for alternative materials, assemblies, and methods. It is also applicable to large-scale planning and policy determination in that it provides the means to estimate the energy required to carry out major building programs.

  13. Beyond Design: The Importance of Construction and Post-Construction Phases in Green Developments

    Directory of Open Access Journals (Sweden)

    Mark Hostetler

    2010-04-01

    Full Text Available Green developments are becoming a popular land use planning concept that attempts to accommodate growth while minimizing impacts on natural resources. Various policies encourage conservation designs that usually translate into the clustering of homes and the conservation of some percentage of open space. However, the success of a design is determined by what happens during the construction and post-construction phases of a subdivision project. These two phases are often ignored in land use planning and given only minimal attention by built environment professionals. As a result, green developments may not be functioning as originally intended. This essay discusses the importance of construction and post-construction and a way forward to create functional, sustainable communities. Construction activities and decisions, such as impacts from earthwork machines, improper protection of conserved open spaces and trees, the choice of plants used for yards and common areas, and the storage of construction material all can lead to severe impacts on natural areas both within and surrounding a development site. During post-construction, a variety of improper management practices by homeowners can compromise the sustainability of a development. Developers and associated environmental consultant teams could implement approaches that would engage contractors and residents, such as environmental construction covenants and the installment of a neighborhood, environmental education program. To increase the adoption of relevant construction and post-construction practices, appropriate policies need to be created. However, the shift will only occur once the planning and built environment community acknowledges that design is only the first step towards sustainability. Academic design studios and continuing education courses can help with this culture shift by including construction and post-construction considerations within their curriculum.

  14. Maternal factors and experiences associated with observed parenting behavior in mothers attending a residential parenting program.

    Science.gov (United States)

    Treyvaud, Karli; Rogers, Susan; Matthews, Jan; Allen, Beverley

    2010-01-01

    Parents experiencing early parenting difficulties often seek support through parenting programs. Characteristics of mothers seeking parenting support and information at an early parenting center in Victoria, Australia and the relationships between these factors and parenting behavior were explored using an observational measure of parent-child interaction. Participants were 43 mothers and children attending a 5-day residential parenting program at the Queen Elizabeth Centre. Maternal and sociodemographic data as well as an observational mother-child interaction task from the Nursing Child Assessment Satellite Training Parent Child Interaction Teaching scale were completed and scored on the first day of the program. Certain maternal factors and experiences were associated with observed parenting behavior. Poorer maternal sleeping quality, unplanned pregnancy and preterm birth were all associated with less optimal parenting behavior in certain domains. Findings are discussed with reference to the impact of past experiences around pregnancy and birth as well as the current context and well-being of mothers attending early parenting centers. Copyright © 2010 Michigan Association for Infant Mental Health.

  15. Virtual reality simulation for construction safety promotion.

    Science.gov (United States)

    Zhao, Dong; Lucas, Jason

    2015-01-01

    Safety is a critical issue for the construction industry. Literature argues that human error contributes to more than half of occupational incidents and could be directly impacted by effective training programs. This paper reviews the current safety training status in the US construction industry. Results from the review evidence the gap between the status and industry expectation on safety. To narrow this gap, this paper demonstrates the development and utilisation of a training program that is based on virtual reality (VR) simulation. The VR-based safety training program can offer a safe working environment where users can effectively rehearse tasks with electrical hazards and ultimately promote their abilities for electrical hazard cognition and intervention. Its visualisation and simulation can also remove the training barriers caused by electricity's features of invisibility and dangerousness.

  16. Measurement of New Observables from the pi+pi- Electroproduction off the Proton

    Energy Technology Data Exchange (ETDEWEB)

    Trivedi, Arjun [Univ. of South Carolina, Columbia, SC (United States)

    2016-12-01

    Knowledge of the Universe as constructed by human beings, in order to tackle its complexity, can be thought to be organized at varying scales at which it is observed. Implicit in such an approach is the idea of a smooth evolution of knowledge between scales and, therefore, access to how Nature constructs the visible Universe beginning from its most fundamental constituents. New and, in a sense, fundamental phenomena may typically be emergent as the scale of observation changes. The study of the Strong Interaction, which is responsible for the construction of the bulk of the visible matter in the Universe (98% by mass), in this sense, is a labor of exploring evolutions and unifying aspects of its knowledge found at varying scales ranging from interaction of quarks and gluons as represented by the theory of Quantum Chromodynamics (QCD) at small space-time scale to emerging dressed quark and even meson-baryon degrees of freedom mostly described by effective models as the space-time scale increases. A direct effort to study the Strong Interaction over this scale forms the basis of an international collaborative effort often referred to as the N* program. The core work of this thesis is an experimental analysis prompted by the need to measure experimental observables that are of particular interest to the theory-experiment epistemological framework of this collaboration. While the core of this thesis, therefore, discusses the nature of the experimental analysis and presents its results which will serve as input to the N* program's epistemological framework, the particular nature of this framework in the context of not only the Strong Interaction, but also that of the physical science and human knowledge in general will be used to motivate and introduce the experimental analysis and its related observables.

  17. Study on modular construction management in AP1000 nuclear plant project

    International Nuclear Information System (INIS)

    Fang Xiaopeng; Shen Wenrong; Sun Kebin; Wei Zhong

    2010-01-01

    The construction of AP1000 Nuclear Power Plant (NPP) has commenced in China. The AP1000 NPP features a passive design concept and modular construction technology. Based on the management of the construction of current AP1000 NNP, this paper describes the effects on Nuclear Island (NI) construction project management resulting from modular construction technology, as well as new construction techniques and methods. This paper puts forward new requirements for construction schedule management of the nuclear island construction at different levels. The AP1000 NI construction logic features the parallel construction of civil and structural erection as the main approach, with the integrated schedule of module fabrication, assembly and installation as support. The structural modules of AP1000 project are prefabricated in shop, delivered to site as sub-modules and assembled to integrated structural module. The assembled module is transported to the construction site, hoisted and finally set in NI. This paper illustrates how to ensure the construction quality of structural modules by analyzing the interface process and key links in the quality control program, and introduces how to ensure the safety of heavy structural components during various construction phases by evaluating and analyzing the construction safety process. This paper also makes an analysis of the safe environment for the assembly and installation of Containment Vessel, the management of product protection and personnel safety inside the Containment Building during 'Open Top' construction, raises to implement effective protection for the numerous pre-set mechanical modules and equipments, as well as personnel safety protection programs and measures. The modular construction feature of AP1000 NPP design requires technique improvement and management innovation during the NI construction. This paper makes a study and research on the control management of schedule, quality and safety of AP1000 NPP NI

  18. Fitting timeseries by continuous-time Markov chains: A quadratic programming approach

    International Nuclear Information System (INIS)

    Crommelin, D.T.; Vanden-Eijnden, E.

    2006-01-01

    Construction of stochastic models that describe the effective dynamics of observables of interest is an useful instrument in various fields of application, such as physics, climate science, and finance. We present a new technique for the construction of such models. From the timeseries of an observable, we construct a discrete-in-time Markov chain and calculate the eigenspectrum of its transition probability (or stochastic) matrix. As a next step we aim to find the generator of a continuous-time Markov chain whose eigenspectrum resembles the observed eigenspectrum as closely as possible, using an appropriate norm. The generator is found by solving a minimization problem: the norm is chosen such that the object function is quadratic and convex, so that the minimization problem can be solved using quadratic programming techniques. The technique is illustrated on various toy problems as well as on datasets stemming from simulations of molecular dynamics and of atmospheric flows

  19. TESS Follow-up Observing Programs at the University of Wyoming

    Science.gov (United States)

    Jang-Condell, Hannah; Kasper, David; Kar, Aman; Sorber, Rebecca; Hancock, Daniel A.; Leuquire, Jacob D.; Suhaimi, Afiq; Kobulnicky, Henry A.; Pierce, Michael; Pilachowski, Catherine A.

    2018-06-01

    The Transiting Exoplanet Survey Satellite (TESS), launched in Spring 2018, will detect thousands of new exoplanet candidates. These candidates will need to be vetted by ground-based observatories to rule out false positives. The Observatories at the University of Wyoming are well-positioned to take active roles in TESS Follow-Up Observing Program (TFOP) Working Groups. The 0.6-m Red Buttes Observatory has already demonstrated its capability to do precision photometric monitoring of transiting exoplanet targets as a participant in the Kilodegree Extremely Little Telescope Follow-Up Network (KELT-FUN). A new echelle spectrograph, Fiber High-Resolution Echelle (FHiRE), being built for the 2.3-m Wyoming InfraRed Observatory (WIRO), will enable precision radial velocity measurements of exoplanet candidates. Over 180 nights/year at both observatories will be available to our team to undertake follow-up observations of TESS Objects of Interest (TOIs). We anticipate making significant contributions to new exoplanet discoveries in the era of TESS.

  20. Residue management in the Bolivia-Brazil gas pipeline construction

    International Nuclear Information System (INIS)

    Freitas, Eduardo Lopes; Henrique, Paulo Roberto Pereira; Cantarino, Anderson Americo Alves

    2000-01-01

    The construction of the gas pipeline is a process sequential of assembly phases, where each one of those phases generates residues of the most varied types and amounts, being necessary the forecast of your generation in agreement with the activity that is being executed. During the accomplishment of the works they are generated a lot of times situations where are observed the inadequate disposition of the residues. Those practices, besides the environmental impact that they cause, it can cart in the future, the need of additional investments be proceeded in the recovery of the areas and removal of the residues. This work presents the Program of administration of Residues instituted during the construction of the pipeline Bolivia - Brazil, seeking, on a side to reduce to the minimum the generation of residues and of the other, moths handling guidelines and disposition, in way to minimize the environmental impacts caused by the same ones. (author)

  1. Boosting INPO's programs with supplier know-how

    International Nuclear Information System (INIS)

    Matson, B.

    1984-01-01

    Nuclear industry suppliers, such as Stone and Webster and Babcock and Wilcox, are key participants in the Institute of Nuclear Power Operators (INPO) effort to promote technical information exchanges throughout the industry and to contribute to INPO training programs. Suppliers have 21 employees on loan to the Institute, although steps must be taken to protect proprietary information and to avoid breaking antitrust laws. Among the NUCLEAR NETWORK programs using supplier expertise is the Significant Event Evaluation and Information Network (SEE-IN), which reviews important reports involving their products. Suppliers benefit by observing evaluation teams at construction sites and plant start-ups

  2. Harvesting and wood transport planning with SNAP III program (Scheduling and Network Analysis Program in a pine plantation in Southeast Brazil

    Directory of Open Access Journals (Sweden)

    Lopes Eduardo da Silva

    2003-01-01

    Full Text Available The objective of this study was to verify the potential of SNAP III (Scheduling and Network Analysis Program as a support tool for harvesting and wood transport planning in Brazil harvesting subsystem definition and establishment of a compatible route were assessed. Initially, machine operational and production costs were determined in seven subsystems for the study area, and quality indexes, construction and maintenance costs of forest roads were obtained and used as SNAP III program input data. The results showed, that three categories of forest road occurrence were observed in the study area: main, secondary and tertiary which, based on quality index, allowed a medium vehicle speed of about 41, 30 and 24 km/hours and a construction cost of about US$ 5,084.30, US$ 2,275.28 and US$ 1,650.00/km, respectively. The SNAP III program used as a support tool for the planning, was found to have a high potential tool in the harvesting and wood transport planning. The program was capable of defining efficiently, the harvesting subsystem on technical and economical basis, the best wood transport route and the forest road to be used in each period of the horizon planning.

  3. Teaching object-oriented programming on top of functional programming

    DEFF Research Database (Denmark)

    Kristensen, Jens Thyge; Hansen, Michael Reichhardt; Richel, Hans

    2001-01-01

    programming in the construction of OO programs. This is done following a method where the program design is expressed in SML and afterwards implemented in Java. The use of different languages in design and implementation is an advantage as it makes the distinction between these two stages very clear...

  4. KASS v.2.2. scheduling software for construction

    Directory of Open Access Journals (Sweden)

    Krzemiński Michał

    2016-01-01

    Full Text Available The paper presents fourth version of specialist useful software in scheduling KASS v.2.2 (Algorithm Scheduling Krzeminski System. KASS software is designed for construction scheduling, specially form flow shop models. The program is being dedicated closely for the purposes of the construction. In distinguishing to other used programs in tasks of this type operational research criteria were designed closely with the thought about construction works and about the specificity of the building production. The minimal time, the minimal slack of brigades, the minimal slacks of the chosen working brigade and costs of the transfer operation of working fronts are included in operational research criteria between work centers. It is possible to enter data into the program both by hand as well as to load the Excel from files, similarly is with results, they are presented on-screen as well as a possibility of enrolling them in the file exists Excel. An element is very valid for it since allows for further simple processing of received results. In providing software for performing operational research calculations a technique of the complete review and simulation technology are being exploited. Described algorithms a program is using which will stay in the article as well as shown computational examples will remain.

  5. Design and construction of program frame software of 300 keV/20 mA EBM control panel computerized base

    International Nuclear Information System (INIS)

    Eko Priyono; Saminto

    2015-01-01

    The program frame software of computer based control panel for 300 keV/20 mA EBM has been designed and constructed. This software is used for EBM components operating system, EBM operating parameters monitor and control system. This software contain instructions program for acquisition, actuation, process and display operation parameters data which is made by using visual basic V.6. This software displays some menus i.e. cover menu, main menu, sub menu and sub-sub menu. Performance test was done by integrating software and hardware and then operated the EBM via computer device. The test show that data communication between software and hardware was suitable, EBM components can be operated via computer device, EMB operation parameters can be controlled and monitored in form digital number, bar graph and continuous graphics the device can execute properly all instruction output program of 300 keV/20 mA control panel so the device is ready to use as one of computerize operating system of 300 keV/20 mA. (author)

  6. Towards a Unified Programming Language

    DEFF Research Database (Denmark)

    Madsen, Ole Lehrmann

    2000-01-01

    The goal of research in programming languages should be to develop languages that integrates the best of concepts and constructs from the various programming paradigms. We do not argue for a multi-paradigm language, where the programmer alternates between the different paradigms/styles. Instead, we...... find that the languages of the future should integrate the best available concepts and constructs in such a way that the programmer does not think of multiple paradigms when using a given language. In this paper, we describe to what extent the BETA language has been successful in obtaining a unified...... style and where more research is needed. In addition to traditional paradigms such as object-oriented-, imperative-functional- and logic programming, we also discuss concurrent programming and prototype-based programming. We discuss language features such as the BETA pattern construct, virtual...

  7. Revised inspection program for nuclear power plants

    International Nuclear Information System (INIS)

    1978-01-01

    The United States Nuclear Regulatory Commission (NRC) regulates nuclear power plants to assure adequate protection of the public and the environment from the dangers associated with nuclear materials. NRC fulfills this responsibility through comprehensive safety reviews of nuclear facilities, licensing of organizations that use nuclear materials, and continuing inspection. The NRC inspection program is currently conducted from the five regional offices in or near Philadelphia, Atlanta, Chicago, Dallas and San Francisco. Inspectors travel from the regional offices to nuclear power plants in various phases of construction, test and operation in order to conduct inspections. However, in June 1977 the Commission approved a revision to the inspection program that will include stationing inspectors at selected plants under construction and at all plants in operation. In addition, the revised program provides for appraising the performance of licensees on a national basis and involves more direct measurement and observation by NRC inspectors of work and tests in progress. The program also includes enhanced career management consisting of improved training and career development for inspectors and other professionals. The report was requested in the Conference Report on the NRC Authorization for Appropriations for Fiscal Year 1978. The report provides a discussion of the basis for both the current and revised inspection programs, describes these programs, and shows how the NRC inspection force will be trained and utilized. In addition, the report includes a discussion of the actions that will be taken to assure the objectivity of inspectors

  8. Capital Construction Fund Program :: Office of Management and Budget

    Science.gov (United States)

    Leaders Budget Policy Work for NOAA Fisheries Contact Us Programs Sustainable Fisheries Protected Regional Fishery Management Councils Congress Activities Budget Testimony Educators and Students Education Budget Home Appeals Division Budget FOIA Financial Services Saltonstall-Kennedy Grant Program Fisheries

  9. Extending Java for High-Level Web Service Construction

    DEFF Research Database (Denmark)

    Christensen, Aske Simon; Møller, Anders; Schwartzbach, Michael Ignatieff

    2003-01-01

    We incorporate innovations from the project into the Java language to provide high-level features for Web service programming. The resulting language, JWIG, contains an advanced session model and a flexible mechanism for dynamic construction of XML documents, in particular XHTML. To support program...

  10. The use of concrete-filled steel structures for modular construction of advanced reactors

    International Nuclear Information System (INIS)

    Braverman, J.; Morante, R.; Hofmayer, C.; Graves, H.

    1997-01-01

    Modular construction techniques have been successfully used in a number of industries, both domestically and internationally. Recently, the use of structural modules has been proposed for advanced nuclear power plants. This paper presents the results of a research program which evaluated the use of modular construction for safety-related structures in advanced nuclear power plant designs. The research program included review of current modular construction technology, development of licensing review criteria for modular construction, and initial validation of currently available analytical techniques applied to concrete-filled steel structural modules

  11. Proposed training program for construction personnel involved in remedial action work at sites contaminated by naturally occurring radionuclides

    International Nuclear Information System (INIS)

    Berven, B.A.; Goldsmith, W.A.; Haywood, F.F.; Schiager, K.J.

    1979-01-01

    Many sites used during the early days of the US atomic energy program are contaminated with radionuclides of the primordial decay chains (uranium, thorium, and actinium series). This contamination consists of residues resulting from refining and processing uranium and thorium. Preparation of these sites for release to unrestricted private use will involve the assistance of construction workers, many of whom have limited knowledge of the hazards associated with radioactive materials. Therefore, there is a need to educate these workers in the fundamentals of radioactive material handling to minimize exposures and possible spread of contamination. This training should disseminate relevant information at an appropriate educational level and should instill a cautious, common-sense attitude toward the handling of radioactive materials. The training should emphasize basic information concerning environmental radiation within a context of relative risk. A multi-media format, including colorful visual aids, demonstration, and discussion, should be used to maximize motivation and retention. A detailed, proposed training program design is presented

  12. Space construction system analysis. Part 2: Cost and programmatics

    Science.gov (United States)

    Vonflue, F. W.; Cooper, W.

    1980-01-01

    Cost and programmatic elements of the space construction systems analysis study are discussed. The programmatic aspects of the ETVP program define a comprehensive plan for the development of a space platform, the construction system, and the space shuttle operations/logistics requirements. The cost analysis identified significant items of cost on ETVP development, ground, and flight segments, and detailed the items of space construction equipment and operations.

  13. Towards a Unified Programming Language

    DEFF Research Database (Denmark)

    Madsen, Ole Lehrmann

    2000-01-01

    style and where more research is needed. In addition to traditional paradigms such as object-oriented-, imperative-functional- and logic programming, we also discuss concurrent programming and prototype-based programming. We discuss language features such as the BETA pattern construct, virtual......The goal of research in programming languages should be to develop languages that integrates the best of concepts and constructs from the various programming paradigms. We do not argue for a multi-paradigm language, where the programmer alternates between the different paradigms/styles. Instead, we...... procedures and classes, higher order classes, methods and functions, part objects, block-structure, and class-less objects....

  14. Construction and design defects in the residential buildings and observed earthquake damage types in Turkey

    Science.gov (United States)

    Cogurcu, M. T.

    2015-04-01

    Turkey is situated in a very active earthquake region. In the last century, several earthquakes resulted in thousands of deaths and enormous economic losses. In 1999, the Kocaeli earthquake had an approximate death toll of more than 20 000, and in 2011 the Van earthquake killed 604 people. In general, Turkish residential buildings have reinforced concrete structural systems. These reinforced concrete structures have several deficiencies, such as low concrete quality, non-seismic steel detailing and inappropriate structural systems including several architectural irregularities. In this study, the general characteristics of Turkish building stock and the deficiencies observed in structural systems are explained, and illustrative figures are given with reference to the Turkish Earthquake Code 2007. The poor concrete quality, lack of lateral or transverse reinforcement in beam-column joints and column confinement zones, high stirrup spacings, under-reinforced columns and over-reinforced beams are the primary causes of failures. Other deficiencies include weak-column-stronger-beam formations, insufficient seismic joint separations, soft-story or weak-story irregularities and short columns. Similar construction and design mistakes are also observed in other countries situated on active earthquake belts. Existing buildings still have these undesirable characteristics, and so to prepare for future earthquakes they must be rehabilitated.

  15. Development of the AuScope Australian Earth Observing System

    Science.gov (United States)

    Rawling, T.

    2017-12-01

    Advances in monitoring technology and significant investment in new national research initiatives, will provide significant new opportunities for delivery of novel geoscience data streams from across the Australian continent over the next decade. The AuScope Australian Earth Observing System (AEOS) is linking field and laboratory infrastructure across Australia to form a national sensor array focusing on the Solid Earth. As such AuScope is working with these programs to deploy observational infrastructure, including MT, passive seismic, and GNSS networks across the entire Australian Continent. Where possible the observational grid will be co-located with strategic basement drilling in areas of shallow cover and tied with national reflection seismic and sampling transects. This integrated suite of distributed earth observation and imaging sensors will provide unprecedented imaging fidelity of our crust, across all length and time scales, to fundamental and applied researchers in the earth, environmental and geospatial sciences. The AEOS will the Earth Science community's Square Kilometer Array (SKA) - a distributed telescope that looks INTO the earth rather than away from it - a 10 million SKA. The AEOS is strongly aligned with other community strategic initiatives including the UNCOVER research program as well as other National Collaborative Research Infrastructure programs such as the Terrestrial Environmental Research Network (TERN) and the Integrated Marine Observing System (IMOS) providing an interdisciplinary collaboration platform across the earth and environmental sciences. There is also very close alignment between AuScope and similar international programs such as EPOS, the USArray and EarthCube - potential collaborative linkages we are currently in the process of pursuing more fomally. The AuScope AEOS Infrastructure System is ultimately designed to enable the progressive construction, refinement and ongoing enrichment of a live, "FAIR" four

  16. Lessons Learned from the First Two Years of Nature's Notebook, the USA National Phenology Network's Plant and Animal Observation Program

    Science.gov (United States)

    Crimmins, T. M.; Rosemartin, A.; Denny, E. G.; Weltzin, J. F.; Marsh, L.

    2010-12-01

    Nature’s Notebook is the USA National Phenology Network’s (USA-NPN) national-scale plant and animal phenology observation program. The program was launched in March 2009 focusing only on plants; 2010 saw the addition of animals and the name and identity “Nature’s Notebook.” Over these two years, we have learned much about how to effectively recruit, train, and retain participants. We have engaged several thousand participants and can report a retention rate, reflected in the number of registered individuals that report observations, of approximately 25%. In 2009, participants reported observations on 133 species of plants on an average of nine days of the year, resulting in over 151,000 records in the USA-NPN phenology database. Results for the 2010 growing season are still being reported. Some of our most valuable lessons learned have been gleaned from communications with our observers. Through an informal survey, participants indicated that they would like to see more regular and consistent communications from USA-NPN program staff; clear, concise, and readily available training materials; mechanisms to keep them engaged and continuing to participate; and quick turn-around on data summaries. We are using this feedback to shape our program into the future. Another key observation we’ve made about our program is the value of locally and regionally-based efforts to implement Nature’s Notebook; some of our most committed observers are participating through partner programs such as the University of California-Santa Barbara Phenology Stewardship Program, Arbor Day Foundation, and the Great Sunflower Project. Future plans include reaching out to more partner organizations and improving our support for locally-based implementations of the Nature’s Notebook program. We have also recognized that the means for reaching and retaining potential participants in Nature’s Notebook vary greatly across generations. As the majority of our participants to

  17. Opportunities for market-based programs worldwide that reduce greenhouse gas emissions: Initial Observations from Missions to the Philippines, South Africa, and Mexico

    International Nuclear Information System (INIS)

    Stanton-Hoyle, D.R.

    1998-01-01

    Globally, governments and industries are implementing innovative voluntary programs to reduce greenhouse gas emissions. Often these programs encourage groups to use cost effective technologies that capture market-based forces. These programs are successful because they capitalize on existing opportunities where both the environment and the participants can benefit (i.e., win-win opportunities). This paper documents efforts to investigate these kinds of win-win opportunities in three developing countries: the Philippines, South Africa, and Mexico. Initial observations are provided as fresh information from the field, drawing on six missions during the last nine months. Utility costs, interest rates, and overall economic health appear to critically affect opportunities in each country. By contrast, details of heating, ventilating and air-conditioning (HVAC) design and local climate were often important differences between countries. These affect opportunities, for example, to achieve significant savings from cooling systems or not. Looking at the success of ESCOs was somewhat surprising. One might expect to see the most successful ESCO activity where utility costs are high and upgrade opportunities are plentiful (such as in the Philippines). This was not the case, however, as research in the Philippines did not reveal even one active ESCO contract yet. Design practices for new construction were in need of the same thing that helps US design teams do a better job of energy-efficient design, better communications between design team members. Finally, industrial firms were doing a variety of EE upgrades in each country, but this level of activity was relatively small compared to what should be cost effective

  18. Social Construction of Cervical Cancer Screening among Panamanian Women

    Science.gov (United States)

    Calvo, Arlene; Brown, Kelli McCormack; McDermott, Robert J.; Bryant, Carol A.; Coreil, Jeanine; Loseke, Donileen

    2012-01-01

    Background: Understanding how "health issues" are socially constructed may be useful for creating culturally relevant programs for Hispanic/Latino populations. Purpose: We explored the constructed meanings of cervical cancer and cervical cancer screening among Panamanian women, as well as socio-cultural factors that deter or encourage…

  19. Military construction program economic analysis manual: Sample economic analyses: Hazardous Waste Remedial Actions Program

    International Nuclear Information System (INIS)

    1987-12-01

    This manual enables the US Air Force to comprehensively and systematically analyze alternative approaches to meeting its military construction requirements. The manual includes step-by-step procedures for completing economic analyses for military construction projects, beginning with determining if an analysis is necessary. Instructions and a checklist of the tasks involved for each step are provided; and examples of calculations and illustrations of completed forms are included. The manual explains the major tasks of an economic analysis, including identifying the problem, selecting realistic alternatives for solving it, formulating appropriate assumptions, determining the costs and benefits of the alternatives, comparing the alternatives, testing the sensitivity of major uncertainties, and ranking the alternatives. Appendixes are included that contain data, indexes, and worksheets to aid in performing the economic analyses. For reference, Volume 2 contains sample economic analyses that illustrate how each form is filled out and that include a complete example of the documentation required

  20. Military construction program economic analysis manual: Text and appendixes: Hazardous Waste Remedial Actions Program

    International Nuclear Information System (INIS)

    1987-12-01

    This manual enables the US Air Force to comprehensively and systematically analyze alternative approaches to meeting its military construction requirements. The manual includes step-by-step procedures for completing economic analyses for military construction projects, beginning with determining if an analysis is necessary. Instructions and a checklist of the tasks involved for each step are provided; and examples of calculations and illustrations of completed forms are included. The manual explains the major tasks of an economic analysis, including identifying the problem, selecting realistic alternatives for solving it, formulating appropriate assumptions, determining the costs and benefits of the alternatives, comparing the alternatives, testing the sensitivity of major uncertainties, and ranking the alternatives. Appendixes are included that contain data, indexes, and worksheets to aid in performing the economic analyses. For reference, Volume 2 contains sample economic analyses that illustrate how each form is filled out and that include a complete example of the documentation required. 6 figs., 12 tabs

  1. Experimental results concerning global observables from the CERN SPS heavy ion program

    International Nuclear Information System (INIS)

    Young, G.R.

    1990-06-01

    A brief overview is given of experimental results obtained during the initial operation of the heavy-ion program at the CERN SPS during the period 1986--1988. This paper confines itself to a presentation of results on so-called global observables, such as energy flow and multiplicity distributions, and on information extracted from them. Of particular interest among the latter are an estimate of the magnitude and spatial distribution of the energy density attained. 3 refs., 27 figs

  2. Peer observation of teaching as a faculty development tool

    Directory of Open Access Journals (Sweden)

    Sullivan Peter B

    2012-05-01

    Full Text Available Abstract Background Peer observation of Teaching involves observers providing descriptive feedback to their peers on learning and teaching practice as a means to improve quality of teaching. This study employed and assessed peer observation as a constructive, developmental process for members of a Pediatric Teaching Faculty. Methods This study describes how peer observation was implemented as part of a teaching faculty development program and how it was perceived by teachers. The PoT process was divided into 4 stages: pre-observation meeting, observation, post-observation feedback and reflection. Particular care was taken to ensure that teachers understood that the observation and feedback was a developmental and not an evaluative process. Twenty teachers had their teaching peer observed by trained Faculty members and gave an e-mail ‘sound-bite’ of their perceptions of the process. Teaching activities included lectures, problem-based learning, small group teaching, case-based teaching and ward-based teaching sessions. Results Teachers were given detailed verbal and written feedback based on the observer’s and students’ observations. Teachers’ perceptions were that PoT was useful and relevant to their teaching practice. Teachers valued receiving feedback and viewed PoT as an opportunity for insight and reflection. The process of PoT was viewed as non-threatening and teachers thought that PoT enhanced the quality of their teaching, promoted professional development and was critical for Faculty development. Conclusions This study demonstrated that PoT can be used in a constructive way to improve course content and delivery, to support and encourage medical teachers, and to reinforce good teaching.

  3. On models of health assistance and the program of family health of the Brazilian Health Department

    Directory of Open Access Journals (Sweden)

    Claudia Hausman Silveira

    2008-08-01

    Full Text Available The article makes reference to the three models that have inspired the construction of the Program of Family Health in Brazil (Cuban, English and Canadian, observing their differences and similarities and comparing them with the Brazilian case. Therefore, an associative line is also constructed between the Only System of Health (SUS and the necessity of a practice which allows the functioning of its lines of direction and organization principles. Thus, we reach the conclusion that the Program of Family Health in Brazil, for its multi professional work proposal in interdisciplinary teams, in accordance with the SUS, can help keep the law of health in the Country. Key-words: SUS; Program of Family Health; Interdisciplinary; Medical care model; Sanitary practice

  4. THE HIGH-TEMPERATURE ELECTROLYSIS PROGRAM AT THE IDAHO NATIONAL LABORATORY: OBSERVATIONS ON PERFORMANCE DEGRADATION

    Energy Technology Data Exchange (ETDEWEB)

    J. E. O' Brien; C. M. Stoots; J. S. Herring; K. G. Condie; G. K. Housley

    2009-06-01

    This paper presents an overview of the high-temperature electrolysis research and development program at the Idaho National Laboratory, with selected observations of electrolysis cell degradation at the single-cell, small stack and large facility scales. The objective of the INL program is to address the technical and scale-up issues associated with the implementation of solid-oxide electrolysis cell technology for hydrogen production from steam. In the envisioned application, high-temperature electrolysis would be coupled to an advanced nuclear reactor for efficient large-scale non-fossil non-greenhouse-gas hydrogen production. The program supports a broad range of activities including small bench-scale experiments, larger scale technology demonstrations, detailed computational fluid dynamic modeling, and system modeling. A summary of the current status of these activities and future plans will be provided, with a focus on the problem of cell and stack degradation.

  5. Scrutinizing a Survey-Based Measure of Science and Mathematics Teacher Knowledge: Relationship to Observations of Teaching Practice

    Science.gov (United States)

    Talbot, Robert M.

    2017-12-01

    There is a clear need for valid and reliable instrumentation that measures teacher knowledge. However, the process of investigating and making a case for instrument validity is not a simple undertaking; rather, it is a complex endeavor. This paper presents the empirical case of one aspect of such an instrument validation effort. The particular instrument under scrutiny was developed in order to determine the effect of a teacher education program on novice science and mathematics teachers' strategic knowledge (SK). The relationship between novice science and mathematics teachers' SK as measured by a survey and their SK as inferred from observations of practice using a widely used observation protocol is the subject of this paper. Moderate correlations between parts of the observation-based construct and the SK construct were observed. However, the main finding of this work is that the context in which the measurement is made (in situ observations vs. ex situ survey) is an essential factor in establishing the validity of the measurement itself.

  6. Annual radioactive waste tank inspection program -- 1993

    International Nuclear Information System (INIS)

    McNatt, F.G. Sr.

    1994-05-01

    Aqueous radioactive wastes from Savannah River Site (SRS) separations processes are contained in large underground carbon steel tanks. Inspections made during 1993 to evaluate these vessels, and evaluations based on data accrued by inspections made since the tanks were constructed, are the subject of this report. The 1993 inspection program revealed that the condition of the Savannah River Site waste tanks had not changed significantly from that reported in the previous annual report. No new leaksites were observed. No evidence of corrosion or materials degradation was observed in the waste tanks. However, degradation was observed on covers of the concrete encasements for the out-of-service transfer lines to Tanks 1 through 8

  7. Training program for energy conservation in new building construction. Volume III. Energy conservation technology for plan examiners and code administrators. Energy Conservation Technology Series 200

    Energy Technology Data Exchange (ETDEWEB)

    None

    1977-12-01

    Under the sponsorship of the United States Department of Energy, a Model Code for Energy Conservation in New Building Construction has been developed by those national organizations primarily concerned with the development and promulgation of model codes. The technical provisions are based on ASHRAE Standard 90-75 and are intended for use by state and local officials. The subject of regulation of new building construction to assure energy conservation is recognized as one in which code officials have not had previous exposure. It was also determined that application of the model code would be made at varying levels by officials with both a specific requirement for knowledge and a differing degree of prior training in the state-of-the-art. Therefore, a training program and instructional materials were developed for code officials to assist them in the implementation and enforcement of energy efficient standards and codes. The training program for Energy Conservation Tehnology for Plan Examiners and Code Administrators (ECT Series 200) is presented.

  8. A survey on parental expectations toward preschool programs

    OpenAIRE

    菊池, 知美

    2009-01-01

    The purpose of this study was to investigate what parents expect from preschool programs. Pilot Study tried to construct a scale to measure parental expectations toward preschools. Based on weekly observation of children at a preschool, interviews with their teachers, and open-end questionnaires filled in by mothers, the parental expectations were hypothesized to involve four dimensions of children's competencies: intellectual abilities, good classroom attitude, sociability, and interactions....

  9. Enhancing Teaching through Constructive Alignment.

    Science.gov (United States)

    Biggs, John

    1996-01-01

    An approach to college-level instructional design that incorporates the principles of constructivism, termed "constructive alignment," is described. The process is then illustrated with reference to a professional development unit in educational psychology for teachers, but the model is viewed as generalizable to most units or programs in higher…

  10. Research on the construction of knowledge base for institutes

    International Nuclear Information System (INIS)

    Yang Ru

    2014-01-01

    Knowledge base (KB in short) is very important for institutes. It can train employees to improve their ability of work. It can supply more information to directors for making right decisions, and can help constructing learning organization to promote innovation. Institutes possess several information systems, but there are some problems such as inadequate use of documents, and connotative knowledge isn't described and communicated. KB of institute is based on programs. It stress integrity, secrecy of programs and authorized access. Libraries have abilities to construct KB, since it's the center of information for the institute. KB of institute includes: KB of training, communion of technique issues, KB of department, personal KB, KB of specialists. Because of low cost many institutes adopt softwares of free codes such as: DSpace, EPrints, Fedodra, CDSware, Greenstone. KB systems are choosed by institutes, depending on types of knowledge, ability of technique, fund and so on. KB is constructed by collecting, sorting, describing key knowledge, connecting, accessing, updating and innovating. Program KB of different places and majors will unite in the future. (author)

  11. Tank Operations Contract Construction Management Methodology. Utilizing The Agency Method Of Construction Management To Safely And Effectively Complete Nuclear Construction Work

    International Nuclear Information System (INIS)

    Leso, K.F.; Hamilton, H.M.; Farner, M.; Heath, T.

    2010-01-01

    contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.

  12. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT TO SAFELY AND EFFECTIVELY COMPLETE NUCLEAR CONSTRUCTION WORK

    Energy Technology Data Exchange (ETDEWEB)

    LESO KF; HAMILTON HM; FARNER M; HEATH T

    2010-01-14

    contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.

  13. Constructibility assessment of APR1400

    International Nuclear Information System (INIS)

    Cho, Sung Jae; Kang, Yong Chul; Lee, Jae Gon; Lim, Woo Sang

    2003-01-01

    APR1400 (formerly KNGR) development is one of national G-7 projects sponsored by government and KHNP (Korea Hydro and Nuclear Power Co., LTD). It is an evolutionary standard reactor with the thermal output of 4000MWt and has been adopted for Shin-Kori Unit 3 and 4. The government organizations, research institutes, universities and industries have participated in the project since 1992 along with KHNP, and the standard design certification program was issued in May 2002. The project set up the top-tier requirements about the safety, economy, operability and maintainability, and constructibility in the early design stage. The requirements have been evaluated periodically during the design process, and the results were reflected to the design. This paper describes the methods for constructibility enhancement and the results of schedule analysis to assure meeting construction duration target, which is set to 48 months from the first concrete pouring to the commercial operation on the condition that learning effects are maximized at Nth plant. To meet the target schedule, the design characteristics and constructibility studies such as new construction methods and construction schedule analysis were performed. The new construction methods presented here are over the top method for NSSS components, deck plate and steel from for concrete wall and slab, automatic welding for large bore piping, and modularization of components and structure, etc. (author)

  14. APPLIED ORGANIZATION OF CONSTRUCTION

    Directory of Open Access Journals (Sweden)

    Kievskiy Leonid Vladimirovich

    2017-03-01

    Full Text Available Applied disciplines in the sphere of construction which are engaged in the solution of vital macroeconomical problems (the general trend of development of these disciplines is the expansion of problematics and mutual integration are considered. Construction organization characteristic at the present stage as a systems engineering discipline covering the investment process of creation of real estate items, is given. The main source of current research trends for applied sciences (socio-economic development forecasts, regional and local programs is determined. Interpenetration and integration of various fields of knowledge exemplified by the current interindustry problem of blocks renovation organization of existing development, is demonstrated. Mathematical model of wave construction (for the period of deployment is proposed. Nature of dependence of the total duration of renovation on the limit of annual input and coefficient of renovation, is established. Overall structure of the Moscow region housing market is presented, and approaches to definition of effective demand are proposed.

  15. Construction safety management guide for use with DOE Order 440.1

    International Nuclear Information System (INIS)

    1997-01-01

    DOE Order (DOE O) 440.1, Worker Protection Management for DOE Federal and Contractor Employees, establishes the framework for an effective worker protection program to reduce or eliminate accidental losses, injuries, and illnesses by providing workers with places of employment free of recognized hazards. In addition to prescribing program requirements applicable to all activities performed by DOE and its contractors, DOE O 440.1 provides specific requirements applicable only to construction activities. The intent of these construction-specific requirements is to compel the proactive management of construction safety on a project-by-project basis and, to the greatest extent possible, integrate the management of safety and health, both in terms of project personnel and management methodologies, with the management of the other primary elements of construction project performance: quality, cost and schedule

  16. Abstraction Mechanisms in the BETA Programming Language

    DEFF Research Database (Denmark)

    Kristensen, Bent Bruun; Madsen, Ole Lehrmann; Møller-Pedersen, Birger

    1983-01-01

    . It is then necessary that the abstraction mechanisms are powerful in order to define more specialized constructs. BETA is an object oriented language like SIMULA 67 ([SIMULA]) and SMALLTALK ([SMALLTALK]). By this is meant that a construct like the SIMULA class/subclass mechanism is fundamental in BETA. In contrast......]) --- covering both data, procedural and control abstractions, substituting constructs like class, procedure, function and type. Correspondingly objects, procedure activation records and variables are all regarded as special cases of the basic building block of program executions: the entity. A pattern thus......The BETA programming language is developed as part of the BETA project. The purpose of this project is to develop concepts, constructs and tools in the field of programming and programming languages. BETA has been developed from 1975 on and the various stages of the language are documented in [BETA...

  17. Generating Consistent Program Tutorials

    DEFF Research Database (Denmark)

    Vestdam, Thomas

    2002-01-01

    In this paper we present a tool that supports construction of program tutorials. A program tutorial provides the reader with an understanding of an example program by interleaving fragments of source code and explaining text. An example program can for example illustrate how to use a library or a......, and we see potential in using the tool to produce program tutorials to be used for frameworks, libraries, and in educational contexts.......In this paper we present a tool that supports construction of program tutorials. A program tutorial provides the reader with an understanding of an example program by interleaving fragments of source code and explaining text. An example program can for example illustrate how to use a library...... or a framework. We present a means for specifying the fragments of a program that are to be in-lined in the tutorial text. These in-line fragments are defined by addressing named syntactical elements, such as classes and methods, but it is also possible to address individual code lines by labeling them...

  18. PopPlanner: Visually constructing demographic models for simulation

    Directory of Open Access Journals (Sweden)

    Gregory Bruce Ewing

    2015-04-01

    Full Text Available Currently there are a number of coalescent simulation programs that support a wide range of features, such as arbitrary demographic models, migration, and sub structure. Defining the model is done typically with either text files or command line switches. Although this has proven to be a powerful method of defining models of high complexity, it is often error prone and difficult to read without familiarity both with command lines and the program in question. A intuitive GUI based population structure program that can both read and write applicable command lines would dramatically simplify the construction, modification, and error checking of such models by a wider user base.Results: PopPlanner is a tool to both construct and inspect complicated demographic models visually with a GUI where the user’s primary interaction is through mouse gestures. Because of their popularity, we focus on ms and by extension msms, command line coalescent simulation programs. Our program can be used to find errors with existing command lines, or to build original command lines. Furthermore the graphical output supports a number of editing and output features including export of publication quality figures.

  19. A novel methodology to estimate the evolution of construction waste in construction sites.

    Science.gov (United States)

    Katz, Amnon; Baum, Hadassa

    2011-02-01

    This paper focuses on the accumulation of construction waste generated throughout the erection of new residential buildings. A special methodology was developed in order to provide a model that will predict the flow of construction waste. The amount of waste and its constituents, produced on 10 relatively large construction sites (7000-32,000 m(2) of built area) was monitored periodically for a limited time. A model that predicts the accumulation of construction waste was developed based on these field observations. According to the model, waste accumulates in an exponential manner, i.e. smaller amounts are generated during the early stages of construction and increasing amounts are generated towards the end of the project. The total amount of waste from these sites was estimated at 0.2m(3) per 1m(2) floor area. A good correlation was found between the model predictions and actual data from the field survey. Copyright © 2010 Elsevier Ltd. All rights reserved.

  20. Construction managers' perceptions of construction safety practices in small and large firms: a qualitative investigation.

    Science.gov (United States)

    Gillen, Marion; Kools, Susan; McCall, Cade; Sum, Juliann; Moulden, Kelli

    2004-01-01

    Despite the institution of explicit safety practices in construction, there continue to be exceedingly high rates of morbidity and mortality from work-related injury. This study's purpose was to identify, compare and contrast views of construction managers from large and small firms regarding construction safety practices. A complementary analysis was conducted with construction workers. A semi-structured interview guide was used to elicit information from construction managers (n = 22) in a series of focus groups. Questions were designed to obtain information on direct safety practices and indirect practices such as communication style, attitude, expectations, and unspoken messages. Data were analyzed using thematic content analysis. Managers identified a broad commitment to safety, worker training, a changing workplace culture, and uniform enforcement as key constructs in maintaining safe worksites. Findings indicate that successful managers need to be involved, principled, flexible, and innovative. Best practices, as well as unsuccessful injury prevention programs, were discussed in detail. Obstacles to consistent safety practice include poor training, production schedules and financial constraints. Construction managers play a pivotal role in the definition and implementation of safety practices in the workplace. In order to succeed in this role, they require a wide variety of management skills, upper management support, and tools that will help them instill and maintain a positive safety culture. Developing and expanding management skills of construction managers may assist them in dealing with the complexity of the construction work environment, as well as providing them with the tools necessary to decrease work-related injuries.

  1. Evaluation of the mandatory construction induction training program in Western Australia: unanticipated consequences.

    Science.gov (United States)

    Bahn, Susanne; Barratt-Pugh, Llandis

    2012-08-01

    Since January 1, 2007, Government legislation in Western Australia required all workers in construction to complete mandatory safety awareness training before they began work on site. During the implementation of this new legislation there was considerable resistance from the construction sector due to the mandatory nature of the training. The construction industry viewed this as an unnecessary impost as they considered that there was already sufficient safety training delivered through individual company and site inductions. In 2010, we evaluated the new Construction Induction Training (CIT) in the commercial construction sector in Western Australia to find that since 2007 there has been an unanticipated change in support for the mandatory training. The 2010 study shows a shift in the values of the safety culture for the commercial sector of the construction industry. In 2010, the industry not only supports the mandatory CIT, but is very vocal in its request to re-institute the refresher courses that were withdrawn in 2009. Indeed, 79% of respondents claimed there were measurable benefits to their business having their employees complete the CIT, while 96% claimed the CIT assisted in reducing accidents/incidents on their worksites. This 2010 study indicates that in this case, mandatory training has had a positive effect on safety culture change and gradually reduced work-related injury in the industry since 2007 to the present. The paper uses data from two studies conducted in 2006 and 2010 to highlight the unanticipated change in perception of the value of mandatory safety training in the WA construction industry to one which is positive and supportive. Crown Copyright © 2011. Published by Elsevier Ltd. All rights reserved.

  2. A constructive version of AIP revisited

    NARCIS (Netherlands)

    Barros, A.; Hou, T.

    2008-01-01

    In this paper, we review a constructive version of the Approximation Induction Principle. This version states that bisimilarity of regular processes can be decided by observing only a part of their behaviour. We use this constructive version to formulate a complete inference system for the Algebra

  3. Building Capacity in Using Earth Observations Under the GOFC-GOLD and TAT Programs

    Science.gov (United States)

    Gutman, G.

    2015-12-01

    The Global Observation of Forest and Land Cover Dynamics (GOFC-GOLD) is a coordinated international effort to provide ongoing space-based and in-situ observations of forests and other vegetation cover. The main goal of GOFC/GOLD is to support a forum for international information exchange, observation and data coordination, and a framework for establishing the necessary long-term monitoring systems. GOFC-GOLD has two Implementation Teams: Land Cover Characteristics and Change, and Fire Monitoring and Mapping. Additionally, it includes two working groups: the Working Group on Biomass Monitoring and the Working group on Reducing Emissions from Deforestation and Forest Degradation (REDD), the latter being aligned with the United Nations Framework Convention on Climate Change. Regional networks are an integral part of the GOFC-GOLD program, with some networks fully developed and some still emerging. GOFC-GOLD provides training workshops to build capacity in the regions. Capacity building in using Earth Observation techniques and applications is also promoted by cooperation of NASA and ESA under the Trans-Atlantic Training (TAT) program. The main objective of TAT is training of early career scientists and students in East European and Baltic countries emphasizing outstanding technical issues in remote sensing of land-cover/land-use change and ecosystems processes. TAT promotes data sharing and advanced research methods and technologies through series of training sessions. Three TAT sessions have been held until now, each session consisting of 5-10 tutors and about 30 early career scientists and students from Eastern Europe. The sessions include lectures on remote sensing covering the full solar spectrum and hands-on practice. The experience obtained in capacity building activities under GOFC-GOLD and TAT will be shared with the audience.

  4. Construction of a nuclear data server using TCP/IP

    Energy Technology Data Exchange (ETDEWEB)

    Kawano, Toshihiko; Sakai, Osamu [Kyushu Univ., Fukuoka (Japan)

    1997-03-01

    We construct a nuclear data server which provides data in the evaluated nuclear data library through the network by means of TCP/IP. The client is not necessarily a user but a computer program. Two examples with a prototype server program are demonstrated, the first is data transfer from the server to a user, and the second is to a computer program. (author)

  5. A revised simplex method for test construction problems

    NARCIS (Netherlands)

    Adema, Jos J.; Adema, J.J.

    1990-01-01

    Linear programming models with 0-1 variables are useful for the construction of tests from an item bank. Most solution strategies for these models start with solving the relaxed 0-1 linear programming model, allowing the 0-1 variables to take on values between 0 and 1. Then, a 0-1 solution is found

  6. Tank Operations Contract Construction Management Methodology. Utilizing The Agency Method Of Construction Management

    International Nuclear Information System (INIS)

    Lesko, K.F.; Berriochoa, M.V.

    2010-01-01

    directly by WRPS to small or disadvantaged contractors that are mentored and supported by URS personnel. Each small contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.

  7. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT

    Energy Technology Data Exchange (ETDEWEB)

    LESKO KF; BERRIOCHOA MV

    2010-02-26

    subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by URS personnel. Each small contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.

  8. ACHP | News | ACHP Issues Program Comment to Streamline Communication

    Science.gov (United States)

    Program Comment to Streamline Communication Facilities Construction and Modification ACHP Issues Program Comment to Streamline Communication Facilities Construction and Modification The Advisory Council on

  9. Methods and models for the construction of weakly parallel tests

    NARCIS (Netherlands)

    Adema, J.J.; Adema, Jos J.

    1992-01-01

    Several methods are proposed for the construction of weakly parallel tests [i.e., tests with the same test information function (TIF)]. A mathematical programming model that constructs tests containing a prespecified TIF and a heuristic that assigns items to tests with information functions that are

  10. Methods and models for the construction of weakly parallel tests

    NARCIS (Netherlands)

    Adema, J.J.; Adema, Jos J.

    1990-01-01

    Methods are proposed for the construction of weakly parallel tests, that is, tests with the same test information function. A mathematical programing model for constructing tests with a prespecified test information function and a heuristic for assigning items to tests such that their information

  11. Policy analysis of the budget used in training program for reducing lower back pain among heavy equipment operators in the construction industry: System dynamics approach

    Science.gov (United States)

    Vitharana, V. H. P.; Chinda, T.

    2018-04-01

    Lower back pain (LBP), prevalence is high among the heavy equipment operators leading to high compensation cost in the construction industry. It is found that proper training program assists in reducing chances of having LBP. This study, therefore aims to examine different safety related budget available to support LBP related training program for different age group workers, utilizing system dynamics modeling approach. The simulation results show that at least 2.5% of the total budget must be allocated in the safety and health budget to reduce the chances of having LBP cases.

  12. A computer-oriented approach to fault-tree construction. Topical report No. 1

    International Nuclear Information System (INIS)

    Chu, B.B.

    1976-11-01

    Fault Tree Analysis is one of the major tools for the safety and reliability analysis of large systems. A methodology for systematically constructing fault trees for general complex systems is developed and applied, via the computer program CAT, to several systems. First, a means of representing component behavior by decision tables is presented. In order to use these tables, a procedure for constructing and editing fault trees, either manually or by computer, is described. In order to verify the methodology the computer program CAT has been developed and used to construct fault trees for two systems

  13. KARATE WITH CONSTRUCTIVE LEARNING

    Directory of Open Access Journals (Sweden)

    Srikrishna Karanam

    2012-02-01

    Full Text Available Any conventional learning process involves the traditional hierarchy of garnering of information and then recall gathered information. Constructive learning is an important research area having wide impact on teaching methods in education, learning theories, and plays a major role in many education reform movements. It is observed that constructive learning advocates the interconnection between emotions and learning. Human teachers identify the emotions of students with varying degrees of accuracy and can improve the learning rate of the students by motivating them. In learning with computers, computers also should be given the capability to recognize emotions so as to optimize the learning process. Image Processing is a very popular tool used in the process of establishing the theory of Constructive Learning. In this paper we use the Optical Flow computation in image sequences to analyze the accuracy of the moves of a karate player. We have used the Lucas-Kanade method for computing the optical flow in image sequences. A database consisting of optical flow images by a group of persons learning karate is formed and the learning rates are analyzed in order to main constructive learning. The contours of flow images are compared with the standard images and the error graphs are plotted. Analysis of the emotion of the amateur karate player is made by observing the error plots.

  14. Construction practices: Pulse builder survey results

    Energy Technology Data Exchange (ETDEWEB)

    Kadulski, R

    This paper discusses the results of a nationwide builder survey on common building techniques, such as framing, insulation, airtight construction practices, testing for airtightness, windows, furnaces and water heaters, and ventilation. Results indicate that changes in construction were mainly influenced by the R-2000 program. The spread of R-2000 technology is reflected in the use of higher insulation levels than are called for by codes or than is normal practice, sealing of joints, and attention to air and vapour retarders as well as air tight drywall techniques combined with mechanical ventilation systems.

  15. SYSTEMIC INNOVATION IN CONSTRUCTION: THE

    DEFF Research Database (Denmark)

    Jensen, Jens Stissing; Koch, Christian

    2007-01-01

    -based. This approach evaluates the outcome of the program against the main intentions formulated in the tender material. Drawing on systemic innovation theory an alternative evaluative approach is suggested which focuses on the build-up of organizational and institutional resources to support the development...... of an emerging ICT trajectory. While the result-based evaluation points to some weaknesses in the quality of the best-practice and cross-organizational elements of the case-material, the systemic approach point to some important sideeffects of the program, such as the stabilization and enrolment of the industry......This paper offers an evaluation of a best practice program called ‘Best in Construction’ (BiC) which aimed to identify and document cases of successful ICT use in the Danish construction industry. The program is evaluated using two different approaches. The first approach is result...

  16. An ecological and theoretical deconstruction of a school-based obesity prevention program in Mexico.

    Science.gov (United States)

    Safdie, Margarita; Cargo, Margaret; Richard, Lucie; Lévesque, Lucie

    2014-08-10

    Ecological intervention programs are recommended to prevent overweight and obesity in children. The National Institute of Public Health (INSP) in Mexico implemented a successful ecological intervention program to promote healthy lifestyle behaviors in school age children. This study assessed the integration of ecological principles and Social Cognitive Theory (SCT) constructs in this effective school-based obesity prevention program implemented in 15 elementary schools in Mexico City. Two coders applied the Intervention Analysis Procedure (IAP) to "map" the program's integration of ecological principles. A checklist gauged the use of SCT theory in program activities. Thirty-two distinct intervention strategies were implemented in one setting (i.e., school) to engage four different target-groups (students, parents, school representatives, government) across two domains (Nutrition and Physical Activity). Overall, 47.5% of the strategies targeted the school infrastructure and/or personnel; 37.5% of strategies targeted a key political actor, the Public Education Secretariat while fewer strategies targeted parents (12.5%) and children (3%). More strategies were implemented in the Nutrition domain (69%) than Physical Activity (31%). The most frequently used SCT construct within both intervention domains was Reciprocal Determinism (e.g., where changes to the environment influence changes in behavior and these behavioral changes influence further changes to the environment); no significant differences were observed in the use of SCT constructs across domains. Findings provide insight into a promising combination of strategies and theoretical constructs that can be used to implement a school-based obesity prevention program. Strategies emphasized school-level infrastructure/personnel change and strong political engagement and were most commonly underpinned by Reciprocal Determinism for both Nutrition and Physical Activity.

  17. CPUE TRENDS OF THE INDONESIA’S TUNA LONGLINE FISHERY: LESSONS LEARNED FROM A TRIAL OBSERVER PROGRAM

    Directory of Open Access Journals (Sweden)

    Lilis Sadiyah

    2014-06-01

    Full Text Available In an effort to address a shortage of reliable CPUE information, and as a preliminary step to a broader observer program, Indonesia established a Trial Observer Program (TOP for the industrial tuna long line fishery based at Benoa Fishing Port, Bali, in mid 2005. The objectives of this paper are i to describe spatial and temporal catch and effort trends from the Indonesian Indian Ocean industrial tuna long line fishery based at Benoa Fishing Port, and ii to provide an understanding of the fishing strategies used by different companies and of the environmental conditions that may influence catch trends. The observed effort covered areas both north and south of 20°S, with a concentration within 10°-20°S; 105°-120°E which overlaps with the only known spawning grounds of southern bluefin tuna (SBT. This data set showed that SBT comprised the lowest catch proportion, relative to the other three tuna species caught, bigeye tuna (BET, yellowfin tuna (YFT and albacore (ALB. BET and ALB had been suggested as the main target species for the fishery, but this varied by region. The TOP data set suggests that different tuna fishing companies targeted different species and used different fishing practices, including differences in bait used, areas fished, start time of setting, and the number of hooks between floats (HBF. It is a priority to improve the spatial and temporal coverage of the observer program before the data can be considered to be representative of the fleet, particularly given the high degree of variability in fishing practices between companies.

  18. CRITICAL EVENTS IN CONSTRUCTION PROCESS

    DEFF Research Database (Denmark)

    Jørgensen, Kirsten; Rasmussen, Grane Mikael Gregaard

    2009-01-01

    cause-effects of failures and defects in the construction industry by using an analytical approach (The bowtie model) which is developed in the accident research. Using this model clarifies the relationships within the chain of failures that causes critical events with undesirable consequences......Function failures, defects and poor communication are major problems in the construction industry. These failures and defects are caused by a row of critical events in the construction process. The purpose of this paper is to define “critical events” in the construction process and to investigate....... In this way the causes of failures and the relationships between various failures are rendered visible. A large construction site was observed from start to finish as the empirical element in the research. The research focuses on all kinds of critical events identified throughout every phase during...

  19. Clinical observations of a Cantonese cognitive-behavioral treatment program for Chinese immigrants.

    Science.gov (United States)

    Shen, Edward K; Alden, Lynn E; Söchting, Ingrid; Tsang, Pheobe

    2006-01-01

    In this article, the authors describe our clinical observations about the process of delivering a Cantonese-language cognitive- behavioral therapy program to treat depression in Hong Kong immigrants to Vancouver, Canada. Our experiences indicated that standard referral and assessment procedures were not optimal for this population. Other factors that required consideration were how to convert Cantonese terms for dysphoric affect into English equivalents and how to implement cognitive modification strategies when dealing with culture-syntonic beliefs about social relationships. (PsycINFO Database Record (c) 2010 APA, all rights reserved).

  20. Construct validity of the LapVR virtual-reality surgical simulator.

    Science.gov (United States)

    Iwata, Naoki; Fujiwara, Michitaka; Kodera, Yasuhiro; Tanaka, Chie; Ohashi, Norifumi; Nakayama, Goro; Koike, Masahiko; Nakao, Akimasa

    2011-02-01

    Laparoscopic surgery requires fundamental skills peculiar to endoscopic procedures such as eye-hand coordination. Acquisition of such skills prior to performing actual surgery is highly desirable for favorable outcome. Virtual-reality simulators have been developed for both surgical training and assessment of performance. The aim of the current study is to show construct validity of a novel simulator, LapVR (Immersion Medical, San Jose, CA, USA), for Japanese surgeons and surgical residents. Forty-four subjects were divided into the following three groups according to their experience in laparoscopic surgery: 14 residents (RE) with no experience in laparoscopic surgery, 14 junior surgeons (JR) with little experience, and 16 experienced surgeons (EX). All subjects executed "essential task 1" programmed in the LapVR, which consists of six tasks, resulting in automatic measurement of 100 parameters indicating various aspects of laparoscopic skills. Time required for each task tended to be inversely correlated with experience in laparoscopic surgery. For the peg transfer skill, statistically significant differences were observed between EX and RE in three parameters, including total time and average time taken to complete the procedure and path length for the nondominant hand. For the cutting skill, similar differences were observed between EX and RE in total time, number of unsuccessful cutting attempts, and path length for the nondominant hand. According to the programmed comprehensive evaluation, performance in terms of successful completion of the task and actual experience of the participants in laparoscopic surgery correlated significantly for the peg transfer (P=0.007) and cutting skills (P=0.026). The peg transfer and cutting skills could best distinguish between EX and RE. This study is the first to provide evidence that LapVR has construct validity to discriminate between novice and experienced laparoscopic surgeons.

  1. Plan of deep underground construction for investigations on high-level radioactive waste storage

    International Nuclear Information System (INIS)

    Mayanovskij, M.S.

    1996-01-01

    The program of studies of the Japanese PNC corporation on construction of deep underground storage for high-level radioactive wastes is presented. The program is intended for 20 years. The total construction costs equal about 20 billion yen. The total cost of the project is equal to 60 billion yen. The underground part is planned to reach 1000 m depth

  2. Owlready: Ontology-oriented programming in Python with automatic classification and high level constructs for biomedical ontologies.

    Science.gov (United States)

    Lamy, Jean-Baptiste

    2017-07-01

    Ontologies are widely used in the biomedical domain. While many tools exist for the edition, alignment or evaluation of ontologies, few solutions have been proposed for ontology programming interface, i.e. for accessing and modifying an ontology within a programming language. Existing query languages (such as SPARQL) and APIs (such as OWLAPI) are not as easy-to-use as object programming languages are. Moreover, they provide few solutions to difficulties encountered with biomedical ontologies. Our objective was to design a tool for accessing easily the entities of an OWL ontology, with high-level constructs helping with biomedical ontologies. From our experience on medical ontologies, we identified two difficulties: (1) many entities are represented by classes (rather than individuals), but the existing tools do not permit manipulating classes as easily as individuals, (2) ontologies rely on the open-world assumption, whereas the medical reasoning must consider only evidence-based medical knowledge as true. We designed a Python module for ontology-oriented programming. It allows access to the entities of an OWL ontology as if they were objects in the programming language. We propose a simple high-level syntax for managing classes and the associated "role-filler" constraints. We also propose an algorithm for performing local closed world reasoning in simple situations. We developed Owlready, a Python module for a high-level access to OWL ontologies. The paper describes the architecture and the syntax of the module version 2. It details how we integrated the OWL ontology model with the Python object model. The paper provides examples based on Gene Ontology (GO). We also demonstrate the interest of Owlready in a use case focused on the automatic comparison of the contraindications of several drugs. This use case illustrates the use of the specific syntax proposed for manipulating classes and for performing local closed world reasoning. Owlready has been successfully

  3. Turbidity monitoring at select MDOT construction sites.

    Science.gov (United States)

    2012-06-01

    The objective of this project was to establish baseline turbidity conditions at select construction : sites by establishing a water quality monitoring program and documenting MDOT approved : BMPs on site. In 2009 the United States Environmental Prote...

  4. Licensing of the OPAL reactor during construction and commissioning

    International Nuclear Information System (INIS)

    Summerfield, M.

    2007-01-01

    This paper presents a description of the licensing activities associated with the construction and commissioning of the Australian Nuclear Science and Technology Organisation's (ANSTO) OPAL reactor. It addresses the Construction Licence, the interface between ANSTO, INVAP (the contractor with responsibility for design and construction of the facility) and the Australian Radiation Protection and Nuclear Safety Agency (ARPANSA, the Australian nuclear regulator) during the construction of OPAL, specific licensing issues that have arisen during the construction and commissioning process, and the Operating Licence Application. Particular emphasis will be given to the way in which the licensing process is integrated into the overall project program and the lessons learnt that may be of benefit to other licensees and regulators

  5. United States Superconducting MHD Magnet Technology Development Program

    International Nuclear Information System (INIS)

    Dawson, A.M.; Marston, P.G.; Thome, R.J.; Iwasa, Y.; Tarrh, J.M.

    1981-01-01

    A three-faceted program supported by the U.S. Dep of Energy is described. These facets include basic technology development, technology transfer and construction by industry of magnets for the national MHD program. The program includes the maintenance of a large component test facility; investigation of superconductor stability and structural behavior; measurements of materials' properties at low temperatures; structural design optimization; analytical code development; cryogenic systems and power supply design. The technology transfer program is designed to bring results of technology development and design and construction effort to the entire superconducting magnet community. The magnet procurement program is responsible for developing conceptual designs of magnets needed for the national MHD program, for issuing requests for quotation, selecting vendors and supervising design, construction, installation and test of these systems. 9 refs

  6. Highway construction on-the-job training program review.

    Science.gov (United States)

    2007-05-01

    "This study provides information about the experiences of trainees, contractors, Montana Department of : Transportation (MDT) field staff, and other state DOT staff in their states On-the-Job Training (OJT) Program. : Obtaining this information is...

  7. The Role of the Military Construction Engineers in the Hybrid War

    Science.gov (United States)

    2015-06-12

    an increase in the need for infrastructure. Military construction engineers were responsible for the NIKE construction program, storage sites for...has minimized the significance of geographical and political boundaries. Because of these facts, the NATO Bi-Strategic Command has assessed Hybrid

  8. SPECKLE CAMERA OBSERVATIONS FOR THE NASA KEPLER MISSION FOLLOW-UP PROGRAM

    International Nuclear Information System (INIS)

    Howell, Steve B.; Everett, Mark E.; Sherry, William; Horch, Elliott; Ciardi, David R.

    2011-01-01

    We present the first results from a speckle imaging survey of stars classified as candidate exoplanet host stars discovered by the Kepler mission. We use speckle imaging to search for faint companions or closely aligned background stars that could contribute flux to the Kepler light curves of their brighter neighbors. Background stars are expected to contribute significantly to the pool of false positive candidate transiting exoplanets discovered by the Kepler mission, especially in the case that the faint neighbors are eclipsing binary stars. Here, we describe our Kepler follow-up observing program, the speckle imaging camera used, our data reduction, and astrometric and photometric performance. Kepler stars range from R = 8 to 16 and our observations attempt to provide background non-detection limits 5-6 mag fainter and binary separations of ∼0.05-2.0 arcsec. We present data describing the relative brightness, separation, and position angles for secondary sources, as well as relative plate limits for non-detection of faint nearby stars around each of 156 target stars. Faint neighbors were found near 10 of the stars.

  9. An Information-theoretic Approach to Optimize JWST Observations and Retrievals of Transiting Exoplanet Atmospheres

    Science.gov (United States)

    Howe, Alex R.; Burrows, Adam; Deming, Drake

    2017-01-01

    We provide an example of an analysis to explore the optimization of observations of transiting hot Jupiters with the James Webb Space Telescope (JWST) to characterize their atmospheres based on a simple three-parameter forward model. We construct expansive forward model sets for 11 hot Jupiters, 10 of which are relatively well characterized, exploring a range of parameters such as equilibrium temperature and metallicity, as well as considering host stars over a wide range in brightness. We compute posterior distributions of our model parameters for each planet with all of the available JWST spectroscopic modes and several programs of combined observations and compute their effectiveness using the metric of estimated mutual information per degree of freedom. From these simulations, clear trends emerge that provide guidelines for designing a JWST observing program. We demonstrate that these guidelines apply over a wide range of planet parameters and target brightnesses for our simple forward model.

  10. AN INFORMATION-THEORETIC APPROACH TO OPTIMIZE JWST OBSERVATIONS AND RETRIEVALS OF TRANSITING EXOPLANET ATMOSPHERES

    Energy Technology Data Exchange (ETDEWEB)

    Howe, Alex R.; Burrows, Adam [Department of Astronomy, University of Michigan, 1085 S. University, Ann Arbor, MI 48109 (United States); Deming, Drake, E-mail: arhowe@umich.edu, E-mail: burrows@astro.princeton.edu, E-mail: ddeming@astro.umd.edu [Department of Astronomy, University of Maryland College Park, MD 20742 (United States)

    2017-01-20

    We provide an example of an analysis to explore the optimization of observations of transiting hot Jupiters with the James Webb Space Telescope ( JWST ) to characterize their atmospheres based on a simple three-parameter forward model. We construct expansive forward model sets for 11 hot Jupiters, 10 of which are relatively well characterized, exploring a range of parameters such as equilibrium temperature and metallicity, as well as considering host stars over a wide range in brightness. We compute posterior distributions of our model parameters for each planet with all of the available JWST spectroscopic modes and several programs of combined observations and compute their effectiveness using the metric of estimated mutual information per degree of freedom. From these simulations, clear trends emerge that provide guidelines for designing a JWST observing program. We demonstrate that these guidelines apply over a wide range of planet parameters and target brightnesses for our simple forward model.

  11. Solar variability observed through changes in solar figure and mean diameter

    International Nuclear Information System (INIS)

    Hill, H.A.

    1984-01-01

    The objective of the project is to detect and monitor climatically significant solar variability by accurate monitoring of the associated variability in solar shape and diameter. The observing program for this project was initiated in 1981. Solar diameter measurements have been taken and data reduction programs for these measurements have been developed. Theoretical analysis of the expected change in the intensity from the solar atmosphere to a given mechanial driving has progressed to the extent that changes in the solar diameter can be related to the associated change in the solar luminosity. An absolute calibration system for the telescope has been constructed and is currently being tested. A proposal is made for the continuation of the work in each of these areas

  12. The Political Construction of Alternative Dispute Resolution and Alternatives to Incarceration.

    Science.gov (United States)

    Palumbo, Dennis J.; And Others

    1994-01-01

    This discussion of evaluations of mediation programs at seven sites and of shock incarceration and home arrest focuses on the similarities in the interpretations of alternative dispute-resolution programs to interpretations of alternatives to incarceration programs. The political construction of the two approaches, which are both designed to…

  13. The National Clinical Skills Competition Promotes the Construction of a Comprehensive Training Program for Chinese Medical Students

    Science.gov (United States)

    Yang, Jing; Huang, Si-min; Lu, Chun-ting; Feng, Lie

    2018-01-01

    To explore an efficient training program based on an analysis in organizing seven sessions for the National Clinical Skills Competition in China. Each year, 6-12 excellent medical students of our university are selected as an observation team. Comparisons of the teaching characteristics were performed in this study. An optimal curriculum…

  14. Milestone-specific, Observed data points for evaluating levels of performance (MODEL) assessment strategy for anesthesiology residency programs.

    Science.gov (United States)

    Nagy, Christopher J; Fitzgerald, Brian M; Kraus, Gregory P

    2014-01-01

    Anesthesiology residency programs will be expected to have Milestones-based evaluation systems in place by July 2014 as part of the Next Accreditation System. The San Antonio Uniformed Services Health Education Consortium (SAUSHEC) anesthesiology residency program developed and implemented a Milestones-based feedback and evaluation system a year ahead of schedule. It has been named the Milestone-specific, Observed Data points for Evaluating Levels of performance (MODEL) assessment strategy. The "MODEL Menu" and the "MODEL Blueprint" are tools that other anesthesiology residency programs can use in developing their own Milestones-based feedback and evaluation systems prior to ACGME-required implementation. Data from our early experience with the streamlined MODEL blueprint assessment strategy showed substantially improved faculty compliance with reporting requirements. The MODEL assessment strategy provides programs with a workable assessment method for residents, and important Milestones data points to programs for ACGME reporting.

  15. Using of science technologies for mining machinery constructions' strength improvement

    Science.gov (United States)

    Yurchenko, E. V.; Mehtiev, A. D.; Yugai, V. V.; Bulatbayev, F. N.

    2015-04-01

    Recommendations for strengthening the brake construction in accident dangerous areas of fatigue destruction were developed. Computer modeling was made using the ANSYS program that helps to visualize stained condition of the construction for further practical testing of the strength and reliability improving technology of mining elevating machines' constructions, which are being in a long-term use, with a help of the strengthening elements. A way of construction strengthening, which eliminates the possibility of further fatigue destruction of the brake system elements, because of the load cycle in exploitation process.

  16. Complementary construction of ideal nonimaging concentrators and its applications.

    Science.gov (United States)

    Gordon, J M

    1996-10-01

    A construction principle for ideal nonimaging concentrators based on the complementary edge rays outside the nominal field of view is presented, with illustrations for the trumpet, compound parabolic concentrator, and compound hyperbolic concentrator. A simple string construction for the trumpet concentrator is shown to follow from this observation-the trumpet having been the one ideal concentrator for which no string-construction method had previously been noted. An application of these observations for solar concentrator design when nonisothermal receivers are advantageous is also presented.

  17. 45 CFR 2490.151 - Program accessibility: New construction and alterations.

    Science.gov (United States)

    2010-10-01

    ... alterations. 2490.151 Section 2490.151 Public Welfare Regulations Relating to Public Welfare (Continued) JAMES MADISON MEMORIAL FELLOWSHIP FOUNDATION ENFORCEMENT OF NONDISCRIMINATION ON THE BASIS OF HANDICAP IN PROGRAMS OR ACTIVITIES CONDUCTED BY THE JAMES MADISON MEMORIAL FELLOWSHIP FOUNDATION § 2490.151 Program...

  18. Personal Insights and Anecdotes about the Weatherization Assistance Program Process Field Study

    Energy Technology Data Exchange (ETDEWEB)

    Treitler, Inga [Anthropology Imagination, Inc., Knoxville, TN (United States)

    2014-09-01

    The present report is based on the research conducted for the Process Field Study between March and September 2011. The Process Field Study documents how Weatherization Assistance Program (WAP) services were delivered to clients, and the quality with which those services were delivered. The assessments were conducted by visiting 19 agencies in 19 states around the country interviewing agency managers, staff, and contractors; observing program intake along, with 43 audits, 45 measure installation and 37 final inspections; and conducting debriefing interviews with clients and weatherization staff following the observation of service delivery. In this report, we turn to detailed observations of a few field interactions. The client stories from our observations illustrate some of the ways clients and crew interact to build the success of the program, but shows there will always be unanticipated obstacles to building trust and getting the program to the public. Stories of staff and crew career paths indicate that weatherization technology and techniques are being learned and used by technicians out of the new home construction industry and that their new knowledge provides them with technical tools and methods that many hope to take back into the construction industry if and when they return. This report is organized according to the four stages of weatherization: intake, audit, installation, and inspection. It contributes to our understanding of the area where policy, environment, culture, and individual decisions influence social innovation. The anecdotes reveal the realities of implementing programs for the benefit of the greater good at minimal cost and sacrifice in times of ever restricting budgets. As the authors revisited their field notes and compiled memorable narratives to communicate the essence of the weatherization experience, they identified three key takeaways that summarize the major issues. First, in WAP as in all services there will always be

  19. Evaluation of Passive Vents in New Construction Multifamily Buildings

    Energy Technology Data Exchange (ETDEWEB)

    Maxwell, Sean [Steven Winter Associates, Norwalk, CT (United States); Berger, David [Steven Winter Associates, Norwalk, CT (United States); Zuluaga, Marc [Steven Winter Associates, Norwalk, CT (United States)

    2016-02-01

    Exhaust ventilation and corresponding outdoor air strategies are being implemented in high performance, new construction, multifamily buildings to meet program or code requirements for improved indoor air quality, but a lack of clear design guidance is resulting in poor performance of these systems despite the best intentions of the programs or standards.

  20. 43 CFR 404.12 - Can Reclamation provide assistance with the construction of a rural water supply project under...

    Science.gov (United States)

    2010-10-01

    ... the construction of a rural water supply project under this program? 404.12 Section 404.12 Public... RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.12 Can Reclamation provide assistance with the construction of a rural water supply project under this program? Reclamation may provide assistance with the...

  1. Staking Terraces Online: A Terrace Layout Program

    Science.gov (United States)

    Terrace construction in Missouri exceeded 3 million feet at a cost of over $8 million in 2008. Up to 50 % of the total construction and design time is spent on the terrace layout itself. A web-based computer program, MOTERR, has been developed to design terrace layouts. The program utilizes digital ...

  2. Programming in a proposed 9X distributed Ada

    Science.gov (United States)

    Waldrop, Raymond S.; Volz, Richard A.; Goldsack, Stephen J.; Holzbach-Valero, A. A.

    1991-01-01

    The studies of the proposed Ada 9X constructs for distribution, now referred to as AdaPT are reported. The goals for this time period were to revise the chosen example scenario and to begin studying about how the proposed constructs might be implemented. The example scenario chosen is the Submarine Combat Information Center (CIC) developed by IBM for the Navy. The specification provided by IBM was preliminary and had several deficiencies. To address these problems, some changes to the scenario specification were made. Some of the more important changes include: (1) addition of a system database management function; (2) addition of a fourth processing unit to the standard resources; (3) addition of an operator console interface function; and (4) removal of the time synchronization function. To implement the CIC scenario in AdaPT, the decided strategy were publics, partitions, and nodes. The principle purpose for implementing the CIC scenario was to demonstrate how the AdaPT constructs interact with the program structure. While considering ways that the AdaPt constructs might be translated to Ada 83, it was observed that the partition construct could reasonably be modeled as an abstract data type. Although this gives a useful method of modeling partitions, it does not at all address the configuration aspects on the node construct.

  3. Assessment of Lean Construction Principles: A Case Study at Semarang Medical Centre Hospital Project

    Directory of Open Access Journals (Sweden)

    Matias Roy Adi Wijaya

    2016-06-01

    Full Text Available The lean construction frameworks have been developed for years to enhance the poor performance of Indonesian project delivery system which influenced by the waste of non-value adding activities. Never the less most of the developments were limited on working process and lack in people empowerment. Toyota Way which integrate working process optimization and people empowerment, was developed as a lean construction frame works. This paper aimed to assess the implementation of Toyota Way principles in project delivery system by observing project’s delivery current state (status quo. The assessment began by conducting a questionnaire survey about Toyota Way implementation which then validated by interview with involved stakeholders and field observation. The assessment showed that project’s stakeholders were still unfamiliar with Toyota Way concept. Although some Toyota Way guidelines have been used in projects completion process such as visual management and training program, it found that those guidelines had not fully implemented. The project delivery system was lack of process focus and concerns more on relationship inter-parties. It also found thatToyota Way implementation will constrained by the difficulties to change the status quo of project delivery. Moreover, it seems that construction projects need practical guidelines to simplify the Toyota Way implementation in project delivery system such as project flow evaluation and system of reflection.

  4. Construction of quality-assured infant feeding process of care data repositories: Construction of the perinatal repository (Part 2).

    Science.gov (United States)

    García-de-León-Chocano, Ricardo; Muñoz-Soler, Verónica; Sáez, Carlos; García-de-León-González, Ricardo; García-Gómez, Juan M

    2016-04-01

    This is the second in a series of two papers regarding the construction of data quality (DQ) assured repositories, based on population data from Electronic Health Records (EHR), for the reuse of information on infant feeding from birth until the age of two. This second paper describes the application of the computational process of constructing the first quality-assured repository for the reuse of information on infant feeding in the perinatal period, with the aim of studying relevant questions from the Baby Friendly Hospital Initiative (BFHI) and monitoring its deployment in our hospital. The construction of the repository was carried out using 13 semi-automated procedures to assess, recover or discard clinical data. The initial information consisted of perinatal forms from EHR related to 2048 births (Facts of Study, FoS) between 2009 and 2011, with a total of 433,308 observations of 223 variables. DQ was measured before and after the procedures using metrics related to eight quality dimensions: predictive value, correctness, duplication, consistency, completeness, contextualization, temporal-stability, and spatial-stability. Once the predictive variables were selected and DQ was assured, the final repository consisted of 1925 births, 107,529 observations and 73 quality-assured variables. The amount of discarded observations mainly corresponds to observations of non-predictive variables (52.90%) and the impact of the de-duplication process (20.58%) with respect to the total input data. Seven out of thirteen procedures achieved 100% of valid births, observations and variables. Moreover, 89% of births and ~98% of observations were consistent according to the experts׳ criteria. A multidisciplinary approach along with the quantification of DQ has allowed us to construct the first repository about infant feeding in the perinatal period based on EHR population data. Copyright © 2016 Elsevier Ltd. All rights reserved.

  5. Logic Programming: PROLOG.

    Science.gov (United States)

    Lopez, Antonio M., Jr.

    1989-01-01

    Provides background material on logic programing and presents PROLOG as a high-level artificial intelligence programing language that borrows its basic constructs from logic. Suggests the language is one which will help the educator to achieve various goals, particularly the promotion of problem solving ability. (MVL)

  6. Evaluation of a Digital Game-Based Learning Program for Enhancing Youth Mental Health: A Structural Equation Modeling of the Program Effectiveness.

    Science.gov (United States)

    Huen, Jenny My; Lai, Eliza Sy; Shum, Angie Ky; So, Sam Wk; Chan, Melissa Ky; Wong, Paul Wc; Law, Y W; Yip, Paul Sf

    2016-10-07

    Digital game-based learning (DGBL) makes use of the entertaining power of digital games for educational purposes. Effectiveness assessment of DGBL programs has been underexplored and no attempt has been made to simultaneously model both important components of DGBL: learning attainment (ie, educational purposes of DGBL) and engagement of users (ie, entertaining power of DGBL) in evaluating program effectiveness. This study aimed to describe and evaluate an Internet-based DGBL program, Professor Gooley and the Flame of Mind, which promotes mental health to adolescents in a positive youth development approach. In particular, we investigated whether user engagement in the DGBL program could enhance their attainment on each of the learning constructs per DGBL module and subsequently enhance their mental health as measured by psychological well-being. Users were assessed on their attainment on each learning construct, psychological well-being, and engagement in each of the modules. One structural equation model was constructed for each DGBL module to model the effect of users' engagement and attainment on the learning construct on their psychological well-being. Of the 498 secondary school students that registered and participated from the first module of the DGBL program, 192 completed all 8 modules of the program. Results from structural equation modeling suggested that a higher extent of engagement in the program activities facilitated users' attainment on the learning constructs on most of the modules and in turn enhanced their psychological well-being after controlling for users' initial psychological well-being and initial attainment on the constructs. This study provided evidence that Internet intervention for mental health, implemented with the technologies and digital innovations of DGBL, could enhance youth mental health. Structural equation modeling is a promising approach in evaluating the effectiveness of DGBL programs.

  7. Status of the construction of the KLOE Drift Chamber

    International Nuclear Information System (INIS)

    Dell'Agnello, S.

    1997-01-01

    A status report on the construction of the drift chamber for the KLOE experiment at the LNF DAΦNE Φ-factory is given. Physics requirements, detector design performance and its key mechanical features and components are briefly reviewed. The program currently consists of (i) the preparation of final detector components, complemented by (ii) extensive tests of prototypes of critical mechanical parts (like the end plates) and the ''test construction'' of a 1:1 chamber prototype. These two sub-programs are pursued in parallel. Single-component prototype checks include surveys of their shape and size, of accuracy of wire-hole drilling, measurements of their displacement or buckling under nominal load. The ''test construction'' is the debugging of mechanical assembly, survey and alignment of mechanics and of wire-stringing robotics, the actual stringing of a sample 2000 holes drilled on the prototype end plates, the measurement of electrical properties of strung wires, as well as of their mechanical tension. These extensive tests have been successfully completed; they represent an effective hands-on training of the construction group, and will allow a prompt and steady start of the drift chamber wire stringing as all necessary components became available at LNF. (orig.)

  8. Applications of the observational method in deep foundations

    Directory of Open Access Journals (Sweden)

    Fathi M. Abdrabbo

    2012-12-01

    Full Text Available The observational method was introduced into geotechnical engineering to improve both theories and construction techniques. This method was developed to avoid highly conservative assumptions about soil properties in geotechnical design when faced with unavoidable uncertainties of natural ground conditions. The assumptions involved in soil mechanics theories usually differ to a certain extent from reality. These assumptions can be improved by employing an observational database. Thus, theories of geotechnical engineering can be developed by observations during the construction stage. Moreover, precise management of construction work by close observations is essential to avoid risk and to alter the design if needed to match the real conditions. This paper sheds some light on the importance of the observational concept in deep foundations through three case studies. The first one demonstrates the effect of working hypotheses on design outputs of an open caisson of 22 m internal diameter. The other two case studies present the difference between theory and reality during construction stage of auger cast-in-place piles (ACIP in difficult subsoil conditions. Importance of merging the documented theories with the available observations is discussed. The study shows that working hypotheses and engineering models affect the cost and the time required for construction of deep foundations. Field observations are essential during installation of ACIP at a site. Some precautions should be considered when drilling ACIP through sandstone of inclined top surface. These precautions are mainly dependent upon field observations during construction. ACIP can be used effectively in soil formations that have galleries and caves using a cement–bentonite mixture to fill the holes of the unsuccessful piles. Finally, the paper shares a series of practical guidelines with engineering community all over the world that may assist in design and construction of deep

  9. Constructing the ScratchJr Programming Language in the Early Childhood Classroom

    Science.gov (United States)

    Portelance, Dylan J.; Strawhacker, Amanda L.; Bers, Marina Umaschi

    2016-01-01

    This paper seeks to contribute to the growing literature on children and computer programming by focusing on a programming language for children in Kindergarten through second grade. Sixty-two students were exposed to a 6-week curriculum using ScartchJr. They learned foundational programming concepts and applied those concepts to create personally…

  10. An assessment of drug testing within the construction industry.

    Science.gov (United States)

    Gerber, Jonathan K; Yacoubian, George S

    2002-01-01

    Drug testing in the workplace has gone from virtual nonexistence to widespread employer acceptance during the past two decades. This growth is particularly significant for the construction industry. High rates of alcohol and other drug use, coupled with the high-risk, safety-sensitive nature of the industry, have prompted the development of a variety of drug surveillance and prevention strategies. Despite this growing vigilance, no scholarly works have examined the impact of drug-related policies in the construction industry. To address this limitation, we investigate the efficacy of workplace drug-testing programs in reducing injury incident rates and workers' compensation experience-rating modification factors (MODs) within the construction industry. Analyses indicate that companies with drug-testing programs experienced a 51 percent reduction in incident rates within two years of implementation. Moreover, companies that drug test their employees experienced a significant reduction in their MODs. Policy implications are discussed in light of the current findings.

  11. Object-oriented programming with gradual abstraction

    DEFF Research Database (Denmark)

    Nørmark, Kurt; Thomsen, Lone Leth; Thomsen, Bent

    2013-01-01

    We describe an experimental object-oriented programming language, ASL2, that supports program development by means of a series of abstraction steps. The language allows immediate object construction, and it is possible to use the constructed objects for concrete problem solving tasks. Classes...... restrictive. As a central mechanism, weakly classified objects are allowed to borrow methods from each other. ASL2 supports class generalization, as a counterpart to class specialization and inheritance in mainstream object-oriented programming languages. The final abstraction step discussed in this paper...

  12. Development of Teachers as Scientists in Research Experiences for Teachers Programs

    Science.gov (United States)

    Faber, Courtney; Hardin, Emily; Klein-Gardner, Stacy; Benson, Lisa

    2014-11-01

    This study examined the teachers' development as scientists for participants in three National Science Foundation Research Experiences for Teachers. Participants included secondary science and math teachers with varying levels of education and experience who were immersed in research environments related to engineering and science topics. Teachers' functionality as scientists was assessed in terms of independence, focus, relationships with mentors, structure, and ability to create new concepts. Hierarchies developed within these constructs allowed tracking of changes in functionality throughout the 6-week programs. Themes were further identified in teachers' weekly journal entries and exit interviews through inductive coding. Increases in functionality as scientists were observed for all teachers who completed both the program and exit interview ( n = 27). Seven of the 27 teachers reached high science functionality; however, three of the teachers did not reach high functionality in any of the constructs during the program. No differences were observed in demographics or teaching experience between those who did and did not reach high functionality levels. Inductive coding revealed themes such as teachers' interactions with mentors and connections made between research and teaching, which allowed for descriptions of experiences for teachers at high and low levels of functionality. Teachers at high functionality levels adjusted to open-ended environments, transitioned from a guided experience to freedom, felt useful in the laboratory, and were self-motivated. In contrast, teachers at low functionality levels did not have a true research project, primarily focused on teaching aspects of the program, and did not display a transition of responsibilities.

  13. Construction techniques and management methods for BWR plants

    International Nuclear Information System (INIS)

    Shimizu, Yohji; Tateishi, Mizuo; Hayashi, Yoshishige

    1989-01-01

    Toshiba is constantly striving for safer and more efficient plant construction to realize high-quality BWR plants within a short construction period. To achieve these aims, Toshiba has developed and improved a large number of construction techniques and construction management methods. In the area of installation, various techniques have been applied such as the modularization of piping and equipment, shop installation of reactor internals, etc. Further, installation management has been upgraded by the use of pre-installation review programs, the development of installation control systems, etc. For commissioning, improvements in commissioning management have been achieved through the use of computer systems, and testing methods have also been upgraded by the development of computer systems for the recording and analysis of test data and the automatic adjustment of controllers in the main control system of the BWR. This paper outlines these construction techniques and management methods. (author)

  14. Constructions and experiences of motherhood in the context of an early intervention for Aboriginal mothers and their children: mother and healthcare worker perspectives.

    Science.gov (United States)

    Ussher, Jane M; Charter, Rosie; Parton, Chloe; Perz, Janette

    2016-07-22

    The colonisation of Australia has been associated with traumatic consequences for Aboriginal health and wellbeing, including the breakdown of the traditional family unit and negative consequences for the mother/child relationship. Early-intervention programs have been developed to assist families to overcome disadvantage and strengthen mother/child attachment. However, there is no research examining Aboriginal women's subjective experiences and constructions of motherhood in the context of such programs, and no research on the perceived impact of such programs, from the perspective of Aboriginal mothers and healthcare workers (HCWs), with previous research focusing on child outcomes. Researchers conducted participant observation of an early intervention program for Aboriginal mothers and young children over a 6 month period, one-to-one interviews and a focus group with 10 mothers, and interviews with nine HCWs, in order to examine their perspectives on motherhood and the intervention program. Thematic analysis identified 2 major themes under which subthemes were clustered. Constructions of motherhood: 'The resilient mother: Coping with life trauma and social stress' and 'The good mother: Transformation of self through motherhood'; Perspectives on the intervention: '"Mothers come to life": Transformation through therapy'; and '"I know I'm a good mum": The need for connections, skills and time for self'. The mothers constructed themselves as being resilient 'good mothers', whilst also acknowledging their own traumatic life experiences, predominantly valuing the peer support and time-out aspects of the program. HCWs positioned the mothers as 'traumatised', yet also strong, and expressed the view that in order to improve mother/child attachment a therapeutic transformation is required. These results suggest that early interventions for Aboriginal mothers should acknowledge and strengthen constructions of the good and resilient mother. The differing perspectives of

  15. Constructions and experiences of motherhood in the context of an early intervention for Aboriginal mothers and their children: mother and healthcare worker perspectives

    Directory of Open Access Journals (Sweden)

    Jane M. Ussher

    2016-07-01

    Full Text Available Abstract Background The colonisation of Australia has been associated with traumatic consequences for Aboriginal health and wellbeing, including the breakdown of the traditional family unit and negative consequences for the mother/child relationship. Early-intervention programs have been developed to assist families to overcome disadvantage and strengthen mother/child attachment. However, there is no research examining Aboriginal women’s subjective experiences and constructions of motherhood in the context of such programs, and no research on the perceived impact of such programs, from the perspective of Aboriginal mothers and healthcare workers (HCWs, with previous research focusing on child outcomes. Method Researchers conducted participant observation of an early intervention program for Aboriginal mothers and young children over a 6 month period, one-to-one interviews and a focus group with 10 mothers, and interviews with nine HCWs, in order to examine their perspectives on motherhood and the intervention program. Results Thematic analysis identified 2 major themes under which subthemes were clustered. Constructions of motherhood: ‘The resilient mother: Coping with life trauma and social stress’ and ‘The good mother: Transformation of self through motherhood’; Perspectives on the intervention: ‘“Mothers come to life”: Transformation through therapy’; and ‘“I know I’m a good mum”: The need for connections, skills and time for self’. Conclusions The mothers constructed themselves as being resilient ‘good mothers’, whilst also acknowledging their own traumatic life experiences, predominantly valuing the peer support and time-out aspects of the program. HCWs positioned the mothers as ‘traumatised’, yet also strong, and expressed the view that in order to improve mother/child attachment a therapeutic transformation is required. These results suggest that early interventions for Aboriginal mothers should

  16. Mental Health of Adults Treated in Adolescence with Scoliosis-Specific Exercise Program or Observed for Idiopathic Scoliosis

    Directory of Open Access Journals (Sweden)

    Maciej Płaszewski

    2014-01-01

    Full Text Available Objective. To examine general mental health in adult males and females, who in adolescence participated in a scoliosis-specific therapeutic exercise program or were under observation due to diagnosis of scoliosis. Design. Registry-based, cross-sectional study with retrospective data collection. Methods. Sixty-eight subjects (43 women aged 30.10 (25–39 years, with mild or moderate scoliosis (11–36° Cobb angle, and 76 (38 women nonscoliotic subjects, aged 30.11 (24–38 years, participated. The time period since the end of the exercise or observation regimes was 16.5 (12-26 years. Beck Depression Inventory (BDI and General Health Questionnaire (GHQ-28 scores were analyzed with the χ2 and U tests. Multiple regression analyses for confounders were also performed. Results. Intergroup differences of demographic characteristics were nonsignificant. Scoliosis, gender, participation in the exercise program, employment, and marital status were associated with BDI scores. The presence of scoliosis and participation in the exercise program manifested association with the symptoms. Higher GHQ-28 “somatic symptoms” subscale scores interacted with the education level. Conclusions. Our findings correspond to the reports of a negative impact of the diagnosis of scoliosis and treatment on mental health. The decision to introduce a therapeutic program in children with mild deformities should be made with judgment of potential benefits, risks, and harm.

  17. Construction of relativistic quantum theory: a progress report

    International Nuclear Information System (INIS)

    Noyes, H.P.

    1986-06-01

    We construct the particulate states of quantum physics using a recursive computer program that incorporates non-determinism by means of locally arbitrary choices. Quantum numbers and coupling constants arise from the construction via the unique 4-level combinatorial hierarchy. The construction defines indivisible quantum events with the requisite supraluminal correlations, yet does not allow supraluminal communication. Measurement criteria incorporate c, h-bar and m/sub p/ or (not ''and'') G, connected to laboratory events via finite particle number scattering theory and the counter paradigm. The resulting theory is discrete throughout, contains no infinities, and, as far as we have developed it, is in agreement with quantum mechanical and cosmological fact

  18. A Body of Work Standard-Setting Method with Construct Maps

    Science.gov (United States)

    Wyse, Adam E.; Bunch, Michael B.; Deville, Craig; Viger, Steven G.

    2014-01-01

    This article describes a novel variation of the Body of Work method that uses construct maps to overcome problems of transparency, rater inconsistency, and scores gaps commonly occurring with the Body of Work method. The Body of Work method with construct maps was implemented to set cut-scores for two separate K-12 assessment programs in a large…

  19. Virtual vitreoretinal surgery: construction of a training programme on the Eyesi Surgical Simulator

    DEFF Research Database (Denmark)

    Vergmann, Anna Stage; Vestergaard, Anders Højslet; Grauslund, Jakob

    Purpose: The purpose of this study was to test the construct validity of a full virtual reality vitreoretinal training program at the Eyesi Surgical simulator. Design and methods: A virtual vitreoretinal training program was composed on the Eyesi Surgical simulator, software version 2.9.2 (VRmagic...... GmbH, Manheim, Germany). It was completed twice by three groups: Group 1: Twenty medical students Group 2: Ten ophthalmology residents Group 3: Five vitreoretinal surgeons The program consisted of six training modules (Figure 1): Navigation level 2 (Nav2) Forceps Training level 5 (ForT5) Bimanual...... developed a training program in virtual vitreoretinal surgery with construct validity for four out of six modules and for overall score. This makes the program a useful tool in the training of future vitreoretinal surgeons....

  20. 2009 Observer Survey Report

    Science.gov (United States)

    Crimmins, Theresa M.; Rosemartin, Alyssa H.; Lincicome, Alexis; Weltzin, Jake F.

    2010-01-01

    The USA‐National Phenology Network (USA‐NPN) seeks to engage volunteer observers in collecting phenological observations of plants and animals using consistent standards and to contribute their observations to a national data repository. In March 2009, the National Coordinating Office staff implemented an online monitoring program for 213 plant species. In this pilot year of the program, 547 observers reported phenology observations on one or more plants via the online interface.

  1. Review of Qualitative Approaches for the Construction Industry: Designing a Risk Management Toolbox

    Directory of Open Access Journals (Sweden)

    David M. Zalk

    2011-06-01

    Conclusion: The Construction Toolbox presents a review-generated format to harness multiple solutions-based national programs and publications for controlling construction-related risks with simplified approaches across the occupational safety, health and hygiene professions.

  2. Constructing constitutive relationships for seismic and aseismic fault slip

    Science.gov (United States)

    Beeler, N.M.

    2009-01-01

    For the purpose of modeling natural fault slip, a useful result from an experimental fault mechanics study would be a physically-based constitutive relation that well characterizes all the relevant observations. This report describes an approach for constructing such equations. Where possible the construction intends to identify or, at least, attribute physical processes and contact scale physics to the observations such that the resulting relations can be extrapolated in conditions and scale between the laboratory and the Earth. The approach is developed as an alternative but is based on Ruina (1983) and is illustrated initially by constructing a couple of relations from that study. In addition, two example constitutive relationships are constructed; these describe laboratory observations not well-modeled by Ruina's equations: the unexpected shear-induced weakening of silica-rich rocks at high slip speed (Goldsby and Tullis, 2002) and fault strength in the brittle ductile transition zone (Shimamoto, 1986). The examples, provided as illustration, may also be useful for quantitative modeling.

  3. Investigation of aerodynamic stability by wind response observation during cantilever construction of the Ikara Ohashi bridge; Ikara Ohashi haridashi sekoji no kaze kansoku ni yoru taifu anteisei no kento

    Energy Technology Data Exchange (ETDEWEB)

    Ueno, K.; Mukai, H.; Takeda, T. [Kajima Corp., Tokyo (Japan)

    1995-12-20

    In order to ensure aerodynamic stability during cantilever construction of the Ikara Ohashi Bridge, wind response observation was carried out and discussions were given on the result. The Ikara Ohashi Bridge is a 5-span continuous PC cable-stayed bridge with the central span being a concrete bridge having a length of 260 m, which is the longest in Japan. The bridge was constructed using a method that main girders are extended from the central tower to the right and left sides while the girders are stayed by bracing cables. The bridge construction site is in an area which is often subjected to typhoons and gusts like seasonal winds in winter, hence a discussion on aerodynamic stability of the bridge especially during extension work was viewed as an important matter. In addition, the construction used two small-capacity cables spaced and bundled as the bracing material, which required verification on their aerodynamic stability. In order to identify vibration characteristics of the main girders and the central tower, wind response observation has been performed as soon as the construction was begun. As a result, the vibration characteristics of the main girders and the central tower were identified, and it was verified that vibration shape and dominant frequency can be evaluated properly by an intrinsic value analysis that uses a multi-material point frame model. Furthermore, effects of different vibration absorbing measures were compared, and the effective methods were adopted as the result. 4 refs., 12 figs.

  4. Assessing problem-solving skills in construction education with the virtual construction simulator

    Science.gov (United States)

    Castronovo, Fadi

    The ability to solve complex problems is an essential skill that a construction and project manager must possess when entering the architectural, engineering, and construction industry. Such ability requires a mixture of problem-solving skills, ranging from lower to higher order thinking skills, composed of cognitive and metacognitive processes. These skills include the ability to develop and evaluate construction plans and manage the execution of such plans. However, in a typical construction program, introducing students to such complex problems can be a challenge, and most commonly the learner is presented with only part of a complex problem. To support this challenge, the traditional methodology of delivering design, engineering, and construction instruction has been going through a technological revolution, due to the rise of computer-based technology. For example, in construction classrooms, and other disciplines, simulations and educational games are being utilized to support the development of problem-solving skills. Previous engineering education research has illustrated the high potential that simulations and educational games have in engaging in lower and higher order thinking skills. Such research illustrated their capacity to support the development of problem-solving skills. This research presents evidence supporting the theory that educational simulation games can help with the learning and retention of transferable problem-solving skills, which are necessary to solve complex construction problems. The educational simulation game employed in this study is the Virtual Construction Simulator (VCS). The VCS is a game developed to provide students in an engaging learning activity that simulates the planning and managing phases of a construction project. Assessment of the third iteration of the VCS(3) game has shown pedagogical value in promoting students' motivation and a basic understanding of construction concepts. To further evaluate the benefits on

  5. Construction of renormalized coefficient functions of the Feynman diagrams by means of a computer

    International Nuclear Information System (INIS)

    Tarasov, O.V.

    1978-01-01

    An algorithm and short description of computer program, written in SCHOONSCHIP, are given. The program is assigned for construction of integrands of renormalized coefficient functions of the Feynman diagrams in scalar theories in the case of arbitrary subtraction point. For the given Feynman graph computer completely realizes the R-operation of Bogolubov-Parasjuk and gives the result as an integral over Feynman parameters. With the help of the program the time construction of the whole renormalized coefficient function is equal approximately 30 s on the CDC-6500 computer

  6. Novel jet observables from machine learning

    Science.gov (United States)

    Datta, Kaustuv; Larkoski, Andrew J.

    2018-03-01

    Previous studies have demonstrated the utility and applicability of machine learning techniques to jet physics. In this paper, we construct new observables for the discrimination of jets from different originating particles exclusively from information identified by the machine. The approach we propose is to first organize information in the jet by resolved phase space and determine the effective N -body phase space at which discrimination power saturates. This then allows for the construction of a discrimination observable from the N -body phase space coordinates. A general form of this observable can be expressed with numerous parameters that are chosen so that the observable maximizes the signal vs. background likelihood. Here, we illustrate this technique applied to discrimination of H\\to b\\overline{b} decays from massive g\\to b\\overline{b} splittings. We show that for a simple parametrization, we can construct an observable that has discrimination power comparable to, or better than, widely-used observables motivated from theory considerations. For the case of jets on which modified mass-drop tagger grooming is applied, the observable that the machine learns is essentially the angle of the dominant gluon emission off of the b\\overline{b} pair.

  7. Gentilly 2: design, construction and commissioning

    International Nuclear Information System (INIS)

    Amyot, Paul; Michel, Benoit.

    1982-06-01

    Construction of the Gentilly 2 power station is essentially complete, and commissioning is proceeding. The main activities during the 1981-82 period have been the completion of the construction and overall testing of the major systems. One cause of delay in the project in 1981 was the discovery of damage to the tubesheet of a steam generator. An internal manhole cover support in the steam generator head had become loose and had caused damage to the tube-to-tubesheet welds. Repairs to the welds were completed in Feb. 1982 after an extensive development program to qualify the welding procedure. Overall project life will be slightly more than 9 years

  8. Patterns of Knowledge Construction

    Science.gov (United States)

    Chang, Bo

    2018-01-01

    The purpose of this study was to identify knowledge construction patterns in a local learning community. Observation, documents, and semistructured interviews were employed to collect data. Twenty learners were interviewed. Data were analyzed inductively using the constant comparative method. Five major patterns--radiation, circulation,…

  9. [The construction of care by the health team and the caretaker within a home-care program for bedridden patients in Porto Alegre (RS, Brazil)].

    Science.gov (United States)

    de Almeida Freitas, Ivani Bueno; Meneghel, Stela Nazareth; Selli, Lucilda

    2011-01-01

    The main objective of this case study was to understand the construction of care in the Homecare Program for Bedridden Patients (PADA) of a basic health unit (UBS) in Porto Alegre, RS. Data were obtained from 13 caretaker groups in the UBS, and participating observation recorded in field diary in the patient's homes. An analysis of the discourse practices was performed inspired in Foucault's discourse concepts speeches and in studies on ethics and self-care. In the groups, the caretaker occupied a space that we metaphorically called the Delphic Oracle, a place for acceptance, listening and support. Hearing the dialogues that took place between the team and the caretakers made us face the contradiction present in the institutional discourse, which both stimulates self-care, and imposes rules, duties, tasks. Care as a citizenship right opposite to care as submission and subjugation created tension inside the group several times. Foucault's notion of care comprises a synthesis of the exercise of a person over his- or herself, making him or her better as a human being and, at the same time, capacitating him or her to become a better citizen.

  10. Bending the urban flow: a construction-migration strategy.

    Science.gov (United States)

    Shaw, R P

    1980-01-01

    The excess rate of migration to urban centers is a problem affecting over 50 developing countries and 18 developed ones (68% of the world's population). Policies that rely on compulsion or disincentives have mostly failed because they do not deal with the cause of the problem. This paper proposes a strategy of increasing or decreasing the rate of housing construction in different urban areas as a means of stimulating or reducing migration to those areas; in most developing areas priority is given to residential construction in already congested metropolitan areas. 5 assumptions are the basis for this approach: 1) migrants tend to gravitate to the most powerful growth poles; 2) residential construction is a leading sector of regional and urban economies; 3) the encouragement of construction activity will make itself felt indirectly via its effect on construction-related employment; 4) rates of residential construction may be manipulated through government policy affecting the cost of materials, availability of loans, level of unionization, and price of housing; and 5) residential construction is amenable to quick policy action. The central idea of the strategy is that an increase in residential construction will exercise a pull on migrants, increasing job opportunities, raising incomes, lowering housing costs, and improving the chances of home ownership. This idea has been verified by various projects in Hong Kong, Ghana, Venezuela, Brazil, Bahrain, Mexico, Colombia, Poland, USSR, and the UK. In Bahrain low-income housing programs have been used to relocate Bahraini nationals in new outlying suburbs and to promote population growth in rural villages. In Mexico self-help and low-income housing programs have helped to redirect migrants headed for small towns toward smaller communities. There is also evidence to show that building construction has the potential to expand and contribute to economic growth. Some problems of implementation might be finding an adequate

  11. Behavior-based safety on construction sites: a case study.

    Science.gov (United States)

    Choudhry, Rafiq M

    2014-09-01

    This work presents the results of a case study and describes an important area within the field of construction safety management, namely behavior-based safety (BBS). This paper adopts and develops a management approach for safety improvements in construction site environments. A rigorous behavioral safety system and its intervention program was implemented and deployed on target construction sites. After taking a few weeks of safety behavior measurements, the project management team implemented the designed intervention and measurements were taken. Goal-setting sessions were arranged on-site with workers' participation to set realistic and attainable targets of performance. Safety performance measurements continued and the levels of performance and the targets were presented on feedback charts. Supervisors were asked to give workers recognition and praise when they acted safely or improved critical behaviors. Observers were requested to have discussions with workers, visit the site, distribute training materials to workers, and provide feedback to crews and display charts. They were required to talk to operatives in the presence of line managers. It was necessary to develop awareness and understanding of what was being measured. In the process, operatives learned how to act safely when conducting site tasks using the designed checklists. Current weekly scores were discussed in the weekly safety meetings and other operational site meetings with emphasis on how to achieve set targets. The reliability of the safety performance measures taken by the company's observers was monitored. A clear increase in safety performance level was achieved across all categories: personal protective equipment; housekeeping; access to heights; plant and equipment, and scaffolding. The research reveals that scores of safety performance at one project improved from 86% (at the end of 3rd week) to 92.9% during the 9th week. The results of intervention demonstrated large decreases in

  12. United States Naval Academy Polar Science Program's Visual Arctic Observing Buoys; The IceGoat

    Science.gov (United States)

    Woods, J. E.; Clemente-Colon, P.; Nghiem, S. V.; Rigor, I.; Valentic, T. A.

    2012-12-01

    The U.S. Naval Academy Oceanography Department currently has a curriculum based Polar Science Program (USNA PSP). Within the PSP there is an Arctic Buoy Program (ABP) student research component that will include the design, build, testing and deployment of Arctic Buoys. Establishing an active, field-research program in Polar Science will greatly enhance Midshipman education and research, as well as introduce future Naval Officers to the Arctic environment. The Oceanography Department has engaged the USNA Ocean Engineering, Systems Engineering, Aerospace Engineering, and Computer Science Departments and developed a USNA Visual Arctic Observing Buoy, IceGoat1, which was designed, built, and deployed by midshipmen. The experience gained through Polar field studies and data derived from these buoys will be used to enhance course materials and laboratories and will also be used directly in Midshipman independent research projects. The USNA PSP successfully deployed IceGoat1 during the BROMEX 2012 field campaign out of Barrow, AK in March 2012. This buoy reports near real-time observation of Air Temperature, Sea Temperature, Atmospheric Pressure, Position and Images from 2 mounted webcams. The importance of this unique type of buoy being inserted into the U.S. Interagency Arctic Buoy Program and the International Arctic Buoy Programme (USIABP/IABP) array is cross validating satellite observations of sea ice cover in the Arctic with the buoys webcams. We also propose to develop multiple sensor packages for the IceGoat to include a more robust weather suite, and a passive acoustic hydrophone. Remote cameras on buoys have provided crucial qualitative information that complements the quantitative measurements of geophysical parameters. For example, the mechanical anemometers on the IABP Polar Arctic Weather Station at the North Pole Environmental Observatory (NPEO) have at times reported zero winds speeds, and inspection of the images from the NPEO cameras have showed

  13. Programs and datatypes

    NARCIS (Netherlands)

    Doornbos, H.; Gasteren, van A.J.M.; Backhouse, R.C.; Brink, C.H.; Kahl, W.; Schmidt, G.

    1997-01-01

    We are programmers, in the sense that it is our concern to improve the process of program construction. Therefore we want to answer questions like: What is programming, why is it so difficult and error-prone, and how can we learn what is needed to make the process more manageable? In the following

  14. A construction process model for implementing constructability in construction

    NARCIS (Netherlands)

    Langkemper, J.; Al-Jibouri, S.; Reymen, I.M.M.J.; Maas, G.J.; Gassel, van F.

    2003-01-01

    In construction, failure of design professionals to consider how a builder will implement the design can result in scheduling problems, cost escalation, delays and disputes during the construction process. The integration of construction knowledge and experience during planning and design is termed

  15. 24 CFR 201.4 - Rules of construction.

    Science.gov (United States)

    2010-04-01

    ... URBAN DEVELOPMENT MORTGAGE AND LOAN INSURANCE PROGRAMS UNDER NATIONAL HOUSING ACT AND OTHER AUTHORITIES TITLE I PROPERTY IMPROVEMENT AND MANUFACTURED HOME LOANS General § 201.4 Rules of construction. As used in this part, and unless the context indicates otherwise, words in the singular include the plural...

  16. Construct Validation--Community College Instructional Development Inventory

    Science.gov (United States)

    Xiong, Soua; Delgado, Nexi; Wood, J. Luke; Harris, Frank, III

    2017-01-01

    This white paper describes the construct validation of the Community College Instructional Development Inventory (CC-IDI). The CC-IDI is an institutional assessment tool designed to inform professional development programming for instructional faculty. The instrument was developed to serve as a standardized assessment tool to determine the…

  17. Construction: first of St. Lucie unit 2 successes

    International Nuclear Information System (INIS)

    Conway, W.F.

    1989-01-01

    The Nuclear Regulatory Commission (NRC) granted a full power operating license for St. Lucie Unit 2 on June 10, 1983, just six years after construction began. The industry average for nuclear power plant construction during this time was approximately ten years. The rate of completion had a positive effect on the cost of the facility. The price of the unit was $1.42 billion as compared to the $2 billion to $5 billion range experienced by other utilities for nuclear plants. These accomplishments were not serendipitous but the results of management techniques and personnel attitudes involved in the construction of the unit. More importantly, many of these same techniques and attitudes have now become part of a quality improvement program at St Lucie and are reflected in its performance indicators. This paper analyzes the construction success of St Lucie Unit 2 and demonstrates that excellent performance in the construction phase can be carried over to the operation of a facility

  18. Cost Based Value Stream Mapping as a Sustainable Construction Tool for Underground Pipeline Construction Projects

    Directory of Open Access Journals (Sweden)

    Murat Gunduz

    2017-11-01

    Full Text Available This paper deals with application of Value Stream Mapping (VSM as a sustainable construction tool on a real construction project of installation of underground pipelines. VSM was adapted to reduce the high percentage of non-value-added activities and time wastes during each construction stage and the paper searched for an effective way to consider the cost for studied construction of underground pipeline. This paper is unique in its way that it adopts cost implementation of VSM to improve the productivity in underground pipeline projects. The data was observed and collected from site during construction, indicating the cycle time, value added and non-value added of each construction stage. The current state was built based on these details. This was an eye-opening exercise and a process management tool as a trigger for improvement. After the current state assessment, a future state is attempted by Value Stream Mapping tool balancing the resources using a Line of Balance (LOB technique. Moreover, a sustainable cost estimation model was developed during current state and future state to calculate the cost of underground pipeline construction. The result shows a cost reduction of 20.8% between current and future states. This reflects the importance of the cost based Value Stream Mapping in construction as a sustainable measurement tool. This new tool could be utilized in construction industry to add the sustainability and effective cost management.

  19. Planning, design, and construction of nuclear power plants: an overview. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Rhodes, D.A.; Rad, P.F.

    1977-12-01

    Chapters are included on generation system descriptions and alternative energy sources; load forecasting and growth projections; utility studies, program development, and analytical models; organizational alternatives and contract arrangements; project control in the design and construction phase; site management activities; construction activities; and startup and testing.

  20. Planning, design, and construction of nuclear power plants: an overview. Final report

    International Nuclear Information System (INIS)

    Rhodes, D.A.; Rad, P.F.

    1977-12-01

    Chapters are included on generation system descriptions and alternative energy sources; load forecasting and growth projections; utility studies, program development, and analytical models; organizational alternatives and contract arrangements; project control in the design and construction phase; site management activities; construction activities; and startup and testing

  1. Modeling Of Construction Noise For Environmental Impact Assessment

    Directory of Open Access Journals (Sweden)

    Mohamed F. Hamoda

    2008-06-01

    Full Text Available This study measured the noise levels generated at different construction sites in reference to the stage of construction and the equipment used, and examined the methods to predict such noise in order to assess the environmental impact of noise. It included 33 construction sites in Kuwait and used artificial neural networks (ANNs for the prediction of noise. A back-propagation neural network (BPNN model was compared with a general regression neural network (GRNN model. The results obtained indicated that the mean equivalent noise level was 78.7 dBA which exceeds the threshold limit. The GRNN model was superior to the BPNN model in its accuracy of predicting construction noise due to its ability to train quickly on sparse data sets. Over 93% of the predictions were within 5% of the observed values. The mean absolute error between the predicted and observed data was only 2 dBA. The ANN modeling proved to be a useful technique for noise predictions required in the assessment of environmental impact of construction activities.

  2. Scale model helps Duke untie construction snags

    International Nuclear Information System (INIS)

    Anon.

    1977-01-01

    A nuclear power plant model, only 60 percent complete, has helped Duke Power identify over 150 major design interferences, which, when resolved, will help cut capital expense and eliminate scheduling problems that normally crop up as revisions are made during actual plant construction. The model has been used by construction, steam production, and design personnel to recommend changes that should improve material handling, operations, and maintenance procedures as well as simplifying piping and cabling. The company has already saved many man-hours in material take-off, material management, and detailed drafting and expects to save even more with greater use of, and improvement in, its modeling program. Duke's modeling program was authorized and became operational in November 1974, with the first model to be the Catawba Nuclear Station. This plant is a two-unit station using Westinghouse nuclear steam supply systems in tandem with General Electric turbine-generators, horizontal feedwater heaters, and Foster Wheeler triple pressure condensers. Each unit is rated 1142 MWe

  3. A Denotational Semantics for Logic Programming

    DEFF Research Database (Denmark)

    Frandsen, Gudmund Skovbjerg

    A fully abstract denotational semantics for logic programming has not been constructed yet. In this paper we present a denotational semantics that is almost fully abstract. We take the meaning of a logic program to be an element in a Plotkin power domain of substitutions. In this way our result...... shows that standard domain constructions suffice, when giving a semantics for logic programming. Using the well-known fixpoint semantics of logic programming we have to consider two different fixpoints in order to obtain information about both successful and failed computations. In contrast, our...... semantics is uniform in that the (single) meaning of a logic program contains information about both successful, failed and infinite computations. Finally, based on the full abstractness result, we argue that the detail level of substitutions is needed in any denotational semantics for logic programming....

  4. A String Search Marketing Application Using Visual Programming

    Science.gov (United States)

    Chin, Jerry M.; Chin, Mary H.; Van Landuyt, Cathryn

    2013-01-01

    This paper demonstrates the use of programing software that provides the student programmer visual cues to construct the code to a student programming assignment. This method does not disregard or minimize the syntax or required logical constructs. The student can concentrate more on the logic and less on the language itself.

  5. What Catches the Eye in Class Observation? Observers' Perspectives in a Multidisciplinary Peer Observation of Teaching Program

    Science.gov (United States)

    Torres, Ana Cristina; Lopes, Amélia; Valente, Jorge M. S.; Mouraz, Ana

    2017-01-01

    Peer Observation of Teaching has raised a lot of interest as a device for quality enhancement of teaching. While much research has focused on its models, implementation schemes and feedback to the observed, little attention has been paid to what the observer actually sees and can learn from the observation. A multidisciplinary peer observation of…

  6. Construction of relativistic quantum theory: a progress report

    Energy Technology Data Exchange (ETDEWEB)

    Noyes, H.P.

    1986-06-01

    We construct the particulate states of quantum physics using a recursive computer program that incorporates non-determinism by means of locally arbitrary choices. Quantum numbers and coupling constants arise from the construction via the unique 4-level combinatorial hierarchy. The construction defines indivisible quantum events with the requisite supraluminal correlations, yet does not allow supraluminal communication. Measurement criteria incorporate c, h-bar and m/sub p/ or (not ''and'') G, connected to laboratory events via finite particle number scattering theory and the counter paradigm. The resulting theory is discrete throughout, contains no infinities, and, as far as we have developed it, is in agreement with quantum mechanical and cosmological fact.

  7. Factorization of Observables

    Science.gov (United States)

    Eliaš, Peter; Frič, Roman

    2017-12-01

    Categorical approach to probability leads to better understanding of basic notions and constructions in generalized (fuzzy, operational, quantum) probability, where observables—dual notions to generalized random variables (statistical maps)—play a major role. First, to avoid inconsistencies, we introduce three categories L, S, and P, the objects and morphisms of which correspond to basic notions of fuzzy probability theory and operational probability theory, and describe their relationships. To illustrate the advantages of categorical approach, we show that two categorical constructions involving observables (related to the representation of generalized random variables via products, or smearing of sharp observables, respectively) can be described as factorizing a morphism into composition of two morphisms having desired properties. We close with a remark concerning products.

  8. A review of the US Global Change Research Program and NASA's Mission to Planet Earth/Earth Observing System

    Science.gov (United States)

    Moore, Berrien, III; Anderson, James G.; Costanza, Robert; Gates, W. Lawrence; Grew, Priscilla C.; Leinen, Margaret S.; Mayewski, Paul A.; McCarthy, James J.; Sellers, Piers J.

    1995-01-01

    This report reflects the results of a ten-day workshop convened at the Scripps Institution of Oceanography July 19-28, 1995. The workshop was convened as the first phase of a two part review of the U.S. Global Change Research Program (USGCRP). The workshop was organized to provide a review of the scientific foundations and progress to date in the USGCRP and an assessment of the implications of new scientific insights for future USGCRP and Mission to Planet Earth/Earth Observing System (MTPE/EOS) activities; a review of the role of NASA's MTPE/EOS program in the USGCRP observational strategy; a review of the EOS Data and Information System (EOSDIS) as a component of USGCRP data management activities; and an assessment of whether recent developments in the following areas lead to a need to readjust MTPE/EOS plans. Specific consideration was given to: proposed convergence of U.S. environmental satellite systems and programs, evolving international plans for Earth observation systems, advances in technology, and potential expansion of the role of the private sector. The present report summarizes the findings and recommendations developed by the Committee on Global Change Research on the basis of the presentations, background materials, working group deliberations, and plenary discussions of the workshop. In addition, the appendices include summaries prepared by the six working groups convened in the course of the workshop.

  9. Military Construction: Process and Outcomes

    Science.gov (United States)

    2016-12-14

    barracks, schools, hospitals, child development centers, and other facilities needed to support U.S. military forces at home and overseas. This military...and programming into the President’s budget could take three or more years. Furthermore, it is important to note that only those projects that have...travel, fuel, minor construction projects of $1M or less, training and education , and depot maintenance, and base operations support. O&M

  10. A methodology for developing distributed programs

    NARCIS (Netherlands)

    Ramesh, S.; Mehndiratta, S.L.

    1987-01-01

    A methodology, different from the existing ones, for constructing distributed programs is presented. It is based on the well-known idea of developing distributed programs via synchronous and centralized programs. The distinguishing features of the methodology are: 1) specification include process

  11. Management of investment-construction projects basing on the matrix of key events

    Directory of Open Access Journals (Sweden)

    Morozenko Andrey Aleksandrovich

    2016-11-01

    Full Text Available The article considers the current problematic issues in the management of investment-construction projects, examines the questions of efficiency increase of construction operations on the basis of the formation of a reflex-adaptive organizational structure. The authors analyzed the necessity of forming a matrix of key events in the investment-construction project (ICP, which will create the optimal structure of the project, basing on the work program for its implementation. For convenience of representing programs of the project implementation in time the authors make recommendations to consolidate the works into separate, economically independent functional blocks. It is proposed to use an algorithm of forming the matrix of an investment-construction project, considering the economic independence of the functional blocks and stages of the ICP implementation. The use of extended network model is justified, which is supplemented by organizational and structural constraints at different stages of the project, highlighting key events fundamentally influencing the further course of the ICP implementation.

  12. Surveillance of construction worker injuries: the utility of trade-specific analysis.

    Science.gov (United States)

    Hunting, K L; Welch, L S; Nessel-Stephens, L; Anderson, J; Mawudeku, A

    1999-07-01

    Construction is a dangerous industry, with high rates of both fatal and nonfatal injuries. To learn more about the causes of nonfatal construction worker injuries, and to identify injury cases for further work site-based investigations or prevention programs, we established an emergency department-based surveillance program in November 1990. This article describes circumstances of injury, diagnoses, and demographic characteristics of injured construction workers for 2,791 cases identified through mid-August, 1997. Lacerations and strains and sprains were the most frequent diagnoses; cutting and piercing objects were the leading causes of injury among all construction workers, followed by falls and overexertion. Because of the variety of work performed in this industry, more detailed injury descriptions, by trade, are most useful for thinking about injury prevention. To illustrate this, we profile injury patterns among workers from four specific trades: carpenters, electricians, plumbers, and ironworkers. Areas of concern highlighted by the trade-specific analyses include eye injuries among plumbers; falls from ladders among electricians and plumbers; slips, trips, and falls on the same level among ironworkers; electrical exposure among electricians; and, amputations among carpenters.

  13. Argentine nuclear program

    International Nuclear Information System (INIS)

    Leibovich, H.; Takacs, E.A.

    1983-01-01

    The paper describes Argentina's nuclear program, detailing its objectives, the schedule of construction of nuclear plants and local production of required equipment. The technologies adopted so far, the local industrial and engineering participation, the preliminary study for the construction of the next power station and Argentina's nonproliferation nuclear policy are analyzed. Argentina's point of view on Canadian nonproliferation policy and CANDU reactor export is discussed

  14. Leadership Role Identity Construction in Women's Leadership Development Programs

    Science.gov (United States)

    Brue, Krystal L.; Brue, Shawn A.

    2018-01-01

    This article analyzes women's only leadership development training to determine how leadership roles are conceptualized and implemented, how women independently and collectively construct new leadership role identities, and how leadership identities are retained post training. Themes of nested validation, accepting the belonging narrative,…

  15. XMM-Newton X-ray Observatory Guest Observer program (AO-1) at CASA

    Science.gov (United States)

    Skinner, Stephen L.

    2003-01-01

    In this research program, we obtained and analyzed X-ray observations of the Wolf-Rayet (WR) star WR 110 (HD 165688) using the XMM-Newton space-based observatory. Radio observations were also obtained using the Very Large Array (VLA) radio telescope located in New Mexico and operated by the Natl. Radio Astronomy Observatory (NRAO). This star was targeted for observations primarily because it is believed to be a single WR star without a companion. Single WR stars are thought to emit X-rays from cool plasma in shocks distributed throughout their powerful stellar winds. However, there has been little observational work done to test this idea since single WR stars are relatively weak X-ray sources and have been difficult to detect with previous generation telescopes. The launch of XMM-Newton provides a new telescope that is much more sensitive than its predecessors, allowing single WR stars to be studied in detail for the first time. X-ray emission was clearly detected from WR 110. Analysis of its spectrum yields a surprising result. Its X-ray emitting plasma is distributed over a range of temperatures and is dominated by relatively cool plasma with a characteristic temperature T is approximately 6 million K. Such plasma can be explained by existing theoretical wind shock models. However, the spectrum also shows hotter plasma whose temperature is uncertain but is thought to be in excess of T approximately 30 million K. The origin of this hotter plasma is yet unknown, but possible mechanisms are identified

  16. The AAVSO Photoelectric Photometry Program in its Scientific and Socio-Historic Context

    Science.gov (United States)

    Percy, John R.

    2011-05-01

    Photoelectric photometry began in the 1900s through the work of Guthnick, Stebbins, and others who constructed and used photometers based on the recently-discovered photoelectric effect. The mid 20th century saw a confluence of several areas of amateur interest: astronomy, telescope making, radio and electronics, and general interest in space. This is the time when AAVSO photoelectric photometry (PEP) began, with observers using mostly hand-built photometers on hand-built telescopes. The 1980s brought a revolution: affordable off-the-shelf solid-state photometers, and infrastructure such as the International Amateur-Professional Photoelectric Photometry (IAPPP) conferences, books, and journal. The AAVSO developed a formal PEP program in the early 1980s. Its emphasis was on long-term monitoring of pulsating red giants. It was competing, not always successfully, with programs such as active sun-like binaries (RS CVn stars) which offered "instant gratification" in the form of publicity and quick publications. Nevertheless, the AAVSO PEP program has, through careful organization, motivation, and feedback to observers, produced extensive scientific results. In this presentation, I shall describe, as examples, my own work, its scientific significance, its educational benefit to dozens of my students, and its satisfaction to the observers. To some extent, the AAVSO PEP program has been superceded by its CCD program, but there is still a useful place for ongoing PEP observations of thousands of variable stars. Reference: http://www.aavso.org/sites/default/files/newsletter/PEP/lastpepnl.pdf Acknowledgements: I thank NSERC Canada for research support, my students, and AAVSO staff and observers, especially Howard Landis.

  17. Observation of Nitrogen and Phosphorus Removals and Accumulations in Surface Flow Constructed Wetland (SFCW

    Directory of Open Access Journals (Sweden)

    Suntud Sirianuntapiboon

    2012-06-01

    Full Text Available The tropical emergent plant species; Cyperus involucratus, Canna siamensis, Heliconia sp., Hymenocallis littoralis, Typha augustifolia and Thalia dealbata were used to observe nutrients (total phosphorus: TP and total nitrogen: TN removal efficiencies of surface flow constructed wetland (SFCW. The system was operated at different hydraulic retention time (HRT of 1, 3 and 5 days and the average atmospheric temperature of 29.1 ± 4.9oC. The seafood industrial wastewater was employed as the influent. The high biomass production plant species; Cyperus involucratus, Typha augustifolia and Thalia dealbata could generate the high oxidative environment. Amount of N and P accumulations in plant tissue were increased with the increase of plant biomass production. The system did not show any significantly different on N and P accumulations among the tested-emergent plant species. But the amount of accumulated-N and P were increased with the increase of HRT. N accumulations in plant tissue, effluent, sediment and media of the system with the tested-emergent plant species under HRT of 1-5 days were in the range of 2.17-43.80%, 7.91-27.75%, 19.62-36.86% and 14.39-31.88%, respectively. Also, P accumulations were 0.79-17.01%, 20.35-28.37%, 40.96-56.27% and 9.09-20.47%, respectively.

  18. Employee assistance programs: history and program description.

    Science.gov (United States)

    Gilbert, B

    1994-10-01

    1. The history and development of Employee Assistance Programs (EAPs) can be traced back to the 1800s. There are currently over 10,000 EAPs in the United States. 2. Standards for program accreditation and counselor certification have been established for EAPs. The "core technology of Employee Assistance Programs" includes identification of behavioural problems based on job performance issues, expert consultation with supervisors, appropriate use of constructive confrontation, microlinkages with treatment providers and resources, macrolinkages between providers, resources, and work organizations, focus on substance abuse, and evaluation of employee success based on job performance. 3. Some EAPs take a broad brush approach, and incorporate health promotion and managed care functions.

  19. Computer program for regional assessment of lung perfusion defect. Part II - verification of the algorithm

    International Nuclear Information System (INIS)

    Stefaniak, B.

    2002-01-01

    As described earlier, a dedicated computer program was developed for quantitative evaluation of regional lung perfusion defects, visualized by pulmonary scintigraphy. The correctness of the basic assumptions accepted to construct the algorithms and of the all program functions needed to be checked, before application of the program into the clinical routine. The aim of this study was to verified the program using various software instruments and physical models. Evaluation of the proposed method was performed using software procedures, physical lung phantom, and selected lung image.The reproducibility of lung regions, defined by the program was found excellent. No significant distortion of registered data was observed after ROI transformation into the circle and retransformation into the original shape. The obtained results comprised parametric presentation of activity defects as well as a set of numerical indices which defined extent and intensity of decreased counts density. Among these indices PD2 and DM* were proved the most suitable for the above purposes. The obtained results indicate that the algorithms used for the program construction were correct and suitable for the aim of the study. The above algorithms enable function under study to be presented graphically with true imaging of activity distribution, as well as numerical indices, defining extent and intensity of activity defects to calculated. (author)

  20. CONSTRUCTIVE EDUCATIONAL ENVIRONMENT SCHOOL-UNIVERSITY

    Directory of Open Access Journals (Sweden)

    Natalya Petrovna Shatalova

    2016-02-01

    Full Text Available The article presents the results of the study the key components of the development of constructive thinking of students on the basis of model building constructive educational environment school-University. It was conducted from a position of constructive approach in education, as a process of systemic-structural methodology of cognitive and creative activity of the student, promotes development and formation of various constructive qualities of the individual. The functions of constructive educational environment school-University aimed at developing constructive thinking of students, defined by its structural components and connections, shows the consistency of self-development of constructive thinking and job satisfaction the development of constructive skills. The findings reveal innovative possibilities of cooperation of schools and universities in the design and functioning model of constructive educatio-nal space that contributes to the development of constructive thinking of all its stakeholders.Purpose: measuring the effectiveness of the model constructive educational environment school-University aimed at the development of students.Methodology: the Programme of research included: (1 diagnosis of the development level of constructive thinking on the questionnaire developed in the context of the constructive theory of education, (2 augmented and revised by the author the diagnosis of satisfaction and importance model of constructive educational environment school-University by the method of G.A. Gagarin, as well as theoretical modeling, method of involved observation, formal teaching method.Results. The article introduces the concept of «constructive learning environments», which are considered in relation to the organization and conduct of joint activities of teachers, teachers and students. The authors give a theoretical comparative analysis of scientific works of colleagues in the context of the problem. Offer a brief

  1. Towards an agent-oriented programming language based on Scala

    Science.gov (United States)

    Mitrović, Dejan; Ivanović, Mirjana; Budimac, Zoran

    2012-09-01

    Scala and its multi-threaded model based on actors represent an excellent framework for developing purely reactive agents. This paper presents an early research on extending Scala with declarative programming constructs, which would result in a new agent-oriented programming language suitable for developing more advanced, BDI agent architectures. The main advantage the new language over many other existing solutions for programming BDI agents is a natural and straightforward integration of imperative and declarative programming constructs, fitted under a single development framework.

  2. A Simple Application Program Interface for Saving Java Program Data on a Wiki

    OpenAIRE

    Yamanoue, Takashi; Oda, Kentaro; Shimozono, Koichi

    2012-01-01

    A simple application program interface (API) for Java programs running on a wiki is implemented experimentally. A Java program with the API can be running on a wiki, and the Java program can save its data on the wiki. The Java program consists of PukiWiki, which is a popular wiki in Japan, and a plug-in, which starts up Java programs and classes of Java. A Java applet with default access privilege cannot save its data at a local host. We have constructed an API of applets for easy and unified...

  3. Results of scatterometer systems analysis for NASA/MSC Earth Observation Sensor Evaluation Program.

    Science.gov (United States)

    Krishen, K.; Vlahos, N.; Brandt, O.; Graybeal, G.

    1971-01-01

    Radar scatterometers have applications in the NASA/MSC Earth Observation Aircraft Program. Over a period of several years, several missions have been flown over both land and ocean. In this paper a system evaluation of the NASA/MSC 13.3-GHz Scatterometer System is presented. The effects of phase error between the Scatterometer channels, antenna pattern deviations, aircraft attitude deviations, environmental changes, and other related factors such as processing errors, system repeatability, and propeller modulation, were established. Furthermore, the reduction in system errors and calibration improvement was investigated by taking into account these parameter deviations. Typical scatterometer data samples are presented.

  4. Perl Modules for Constructing Iterators

    Science.gov (United States)

    Tilmes, Curt

    2009-01-01

    The Iterator Perl Module provides a general-purpose framework for constructing iterator objects within Perl, and a standard API for interacting with those objects. Iterators are an object-oriented design pattern where a description of a series of values is used in a constructor. Subsequent queries can request values in that series. These Perl modules build on the standard Iterator framework and provide iterators for some other types of values. Iterator::DateTime constructs iterators from DateTime objects or Date::Parse descriptions and ICal/RFC 2445 style re-currence descriptions. It supports a variety of input parameters, including a start to the sequence, an end to the sequence, an Ical/RFC 2445 recurrence describing the frequency of the values in the series, and a format description that can refine the presentation manner of the DateTime. Iterator::String constructs iterators from string representations. This module is useful in contexts where the API consists of supplying a string and getting back an iterator where the specific iteration desired is opaque to the caller. It is of particular value to the Iterator::Hash module which provides nested iterations. Iterator::Hash constructs iterators from Perl hashes that can include multiple iterators. The constructed iterators will return all the permutations of the iterations of the hash by nested iteration of embedded iterators. A hash simply includes a set of keys mapped to values. It is a very common data structure used throughout Perl programming. The Iterator:: Hash module allows a hash to include strings defining iterators (parsed and dispatched with Iterator::String) that are used to construct an overall series of hash values.

  5. Real-Time MENTAT programming language and architecture

    Science.gov (United States)

    Grimshaw, Andrew S.; Silberman, Ami; Liu, Jane W. S.

    1989-01-01

    Real-time MENTAT, a programming environment designed to simplify the task of programming real-time applications in distributed and parallel environments, is described. It is based on the same data-driven computation model and object-oriented programming paradigm as MENTAT. It provides an easy-to-use mechanism to exploit parallelism, language constructs for the expression and enforcement of timing constraints, and run-time support for scheduling and exciting real-time programs. The real-time MENTAT programming language is an extended C++. The extensions are added to facilitate automatic detection of data flow and generation of data flow graphs, to express the timing constraints of individual granules of computation, and to provide scheduling directives for the runtime system. A high-level view of the real-time MENTAT system architecture and programming language constructs is provided.

  6. Environmental performance of construction waste: Comparing three scenarios from a case study in Catalonia, Spain.

    Science.gov (United States)

    Ortiz, O; Pasqualino, J C; Castells, F

    2010-04-01

    The main objective of this paper is to evaluate environmental impacts of construction wastes in terms of the LIFE 98 ENV/E/351 project. Construction wastes are classified in accordance with the Life Program Environment Directive of the European Commission. Three different scenarios to current waste management from a case study in Catalonia (Spain) have been compared: landfilling, recycling and incineration, and these scenarios were evaluated by means of Life Cycle Assessment. The recommendations of the Catalan Waste Catalogue and the European Waste Catalogue have been taken into account. Also, the influence of transport has been evaluated. Results show that in terms of the Global Warming Potential, the most environmentally friendly treatment was recycling, followed by incineration and lastly landfilling. According to the influence of treatment plants location on the GWP indicator, we observe that incineration and recycling of construction wastes are better than landfilling, even for long distances from the building site to the plants. This is true for most wastes except for the stony types, than should be recycled close to the building site. In summary, data from construction waste of a Catalan case study was evaluated using the well established method of LCA to determine the environmental impacts. Copyright 2009 Elsevier Ltd. All rights reserved.

  7. Environmental performance of construction waste: Comparing three scenarios from a case study in Catalonia, Spain

    International Nuclear Information System (INIS)

    Ortiz, O.; Pasqualino, J.C.; Castells, F.

    2010-01-01

    The main objective of this paper is to evaluate environmental impacts of construction wastes in terms of the LIFE 98 ENV/E/351 project. Construction wastes are classified in accordance with the Life Program Environment Directive of the European Commission. Three different scenarios to current waste management from a case study in Catalonia (Spain) have been compared: landfilling, recycling and incineration, and these scenarios were evaluated by means of Life Cycle Assessment. The recommendations of the Catalan Waste Catalogue and the European Waste Catalogue have been taken into account. Also, the influence of transport has been evaluated. Results show that in terms of the Global Warming Potential, the most environmentally friendly treatment was recycling, followed by incineration and lastly landfilling. According to the influence of treatment plants location on the GWP indicator, we observe that incineration and recycling of construction wastes are better than landfilling, even for long distances from the building site to the plants. This is true for most wastes except for the stony types, than should be recycled close to the building site. In summary, data from construction waste of a Catalan case study was evaluated using the well established method of LCA to determine the environmental impacts.

  8. Constructing Hardware in a Scale Embedded Language

    Energy Technology Data Exchange (ETDEWEB)

    2014-08-21

    Chisel is a new open-source hardware construction language developed at UC Berkeley that supports advanced hardware design using highly parameterized generators and layered domain-specific hardware languages. Chisel is embedded in the Scala programming language, which raises the level of hardware design abstraction by providing concepts including object orientation, functional programming, parameterized types, and type inference. From the same source, Chisel can generate a high-speed C++-based cycle-accurate software simulator, or low-level Verilog designed to pass on to standard ASIC or FPGA tools for synthesis and place and route.

  9. Managing engineering to meet construction requirements

    International Nuclear Information System (INIS)

    Martin, D.F.; Houchen, J.D.

    1976-01-01

    The San Onofre Units 2 and 3 Project schedule is compared with Bechtel's Generic Nuclear Power Plant schedule. This comparison shows that the major delays experienced on the San Onofre Project have resulted from the regulatory process. To date, Engineering has met Construction's requirements and the Project has not experienced any Engineering related delays. The San Onofre Project has been faced with many uncertainties, such as limited site area, high seismic design criteria, new and changing Federal and State regulations, shifts in supplier market conditions and unpredictable supplier performance. Each of these uncertainties has impacted the Engineering effort and jeopardized project schedule goals. The SCE-Bechtel Engineering Management team has acted to mitigate the impact of these uncertainties through use of a cost trend program, simplification of SCE-Bechtel interfaces, close Engineering-Construction coordination, the use of task forces to handle critical supplier problems and the use of additional Engineering personnel, etc. so that Construction requirements have been met

  10. BASES OF CONSTRUCTIVITY OF MODERN PERSONALITY

    Directory of Open Access Journals (Sweden)

    Natalya Petrovna Shatalova

    2014-11-01

    Full Text Available Formation of bases of constructibility is important process at this stage of de-velopment of our state. Personality of modern type must be capable to self-determination, competent adoption of constructive decisions and manifestation of a personal responsibility for the constructive election, personality of modern type must be capable for self-determination, competent adoption of constructive decisions and manifestation to a personal responsibility for the constructive choice. Formation of bases of constructibility in the course of education is caused by use of constructive tasks and the constructive educational environment which define innovative recep-tions and skills of influence as methods of pedagogical influence taking into account constantly changing circumstances. Extent of mastering each member of society bases of constructibility defines a spiritual condition of society, of the present and the future of our country, development of economy and culture in general.Purpose: consideration of question about development of constructive thinking and constructive skills of personality in modern constructive educational environ-ment.Methodology: formal pedagogical method, the theoretical modeling, the meth-od of participant observation.Results. In the article is give the short analysis of problem of development of personality in modern society, opened the concept of constructibility of the personali-ty and her basic components, classification constructive tasks investigated, specified preparatory steps for organization of the conditions of development of a constructibil-ity and gives a brief description of their. Article has the scientific value as contains au-thor's generalizations possessing scientific novelty and the conclusions directed on disclosure of problems of formation and development of the modern personality, considered from the point of view of the theory of democratic constructivism in edu-cation.Practical implications: pedagogical

  11. Causes of defects in the South African housing construction industry ...

    African Journals Online (AJOL)

    Martyn le Roux, Department of Quantity Surveying, P.O. Box 77000, Nelson Mandela ... in South Africa. There is a shortage of skilled people in the South. African construction industry; local and international companies within the construction industry are joining ..... observation of construction of any new home or building.

  12. A quantitative experimental paradigm to optimize construction of rank order lists in the National Resident Matching Program: the ROSS-MOORE approach.

    Science.gov (United States)

    Ross, David A; Moore, Edward Z

    2013-09-01

    As part of the National Resident Matching Program, programs must submit a rank order list of desired applicants. Despite the importance of this process and the numerous manifest limitations with traditional approaches, minimal research has been conducted to examine the accuracy of different ranking strategies. The authors developed the Moore Optimized Ordinal Rank Estimator (MOORE), a novel algorithm for ranking applicants that is based on college sports ranking systems. Because it is not possible to study the Match in vivo, the authors then designed the Recruitment Outcomes Simulation System (ROSS). This program was used to simulate a series of interview seasons and to compare MOORE and traditional approaches under different conditions. The accuracy of traditional ranking and the MOORE approach are equally and adversely affected with higher levels of intrarater variability. However, compared with traditional ranking methods, MOORE produces a more accurate rank order list as interrater variability increases. The present data demonstrate three key findings. First, they provide proof of concept that it is possible to scientifically test the accuracy of different rank methods used in the Match. Second, they show that small amounts of variability can have a significant adverse impact on the accuracy of rank order lists. Finally, they demonstrate that an ordinal approach may lead to a more accurate rank order list in the presence of interviewer bias. The ROSS-MOORE approach offers programs a novel way to optimize the recruitment process and, potentially, to construct a more accurate rank order list.

  13. A comparative analysis of methods to represent uncertainty in estimating the cost of constructing wastewater treatment plants.

    Science.gov (United States)

    Chen, Ho-Wen; Chang, Ni-Bin

    2002-08-01

    Prediction of construction cost of wastewater treatment facilities could be influential for the economic feasibility of various levels of water pollution control programs. However, construction cost estimation is difficult to precisely evaluate in an uncertain environment and measured quantities are always burdened with different types of cost structures. Therefore, an understanding of the previous development of wastewater treatment plants and of the related construction cost structures of those facilities becomes essential for dealing with an effective regional water pollution control program. But deviations between the observed values and the estimated values are supposed to be due to measurement errors only in the conventional regression models. The inherent uncertainties of the underlying cost structure, where the human estimation is influential, are rarely explored. This paper is designed to recast a well-known problem of construction cost estimation for both domestic and industrial wastewater treatment plants via a comparative framework. Comparisons were made for three technologies of regression analyses, including the conventional least squares regression method, the fuzzy linear regression method, and the newly derived fuzzy goal regression method. The case study, incorporating a complete database with 48 domestic wastewater treatment plants and 29 industrial wastewater treatment plants being collected in Taiwan, implements such a cost estimation procedure in an uncertain environment. Given that the fuzzy structure in regression estimation may account for the inherent human complexity in cost estimation, the fuzzy goal regression method does exhibit more robust results in terms of some criteria. Moderate economy of scale exists in constructing both the domestic and industrial wastewater treatment plants. Findings indicate that the optimal size of a domestic wastewater treatment plant is approximately equivalent to 15,000 m3/day (CMD) and higher in Taiwan

  14. Implementing the "Teaching Students To Be Peacemakers Program"

    Science.gov (United States)

    Johnson, David W.; Johnson, Roger T.

    2004-01-01

    The Teaching Students To Be Peacemakers Program trains every student in a school in the competencies they need to (a) resolve conflicts constructively and (b) make their schools safe places in which to learn. The program is directly based on the theory and research on constructive conflict resolution. More than 16 studies in 2 different countries…

  15. MELCOR DB Construction for the Severe Accident Analysis DB

    International Nuclear Information System (INIS)

    Song, Y. M.; Ahn, K. I.

    2011-01-01

    The Korea Atomic Energy Research Institute (KAERI) has been constructing a severe accident analysis database (DB) under a National Nuclear R and D Program. In particular, an MAAP (commercial code being widely used in industries for integrated severe accident analysis) DB for many scenarios including a station blackout (SBO) has been completed. This paper shows the MELCOR DB construction process with examples of SBO scenarios, and the results will be used for a comparison with the MAAP DB

  16. Co-construction and evaluation of a prevention program for improving the nutritional quality of food purchases at no additional cost in a socio-economically disadvantaged population

    OpenAIRE

    Perignon, Marlène; Dubois, Christophe; Gazan, Rozenn; Maillot, Matthieu; Muller, Laurent; Ruffieux, Bernard; Gaigi, Hind; Darmon, Nicole

    2017-01-01

    Background: Food prices influence food choices. Purchasing foods with higher nutritional quality for their price may help improve the diet quality of socio-economically disadvantaged individuals. Objective: To describe the co-construction and evaluation of the 'Opticourses' prevention program promoting healthy eating among participants in deprived socio-economical situations by improving the nutritional quality of their household food purchases with no additional cost. Methods: Individuals we...

  17. Ezhil: A Tamil Programming Language

    OpenAIRE

    Annamalai, Muthiah

    2009-01-01

    Ezhil is a Tamil language based interpreted procedural programming language. Tamil keywords and grammar are chosen to make the native Tamil speaker write programs in the Ezhil system. Ezhil allows easy representation of computer program closer to the Tamil language logical constructs equivalent to the conditional, branch and loop statements in modern English based programming languages. Ezhil is a compact programming language aimed towards Tamil speaking novice computer users. Grammar for Ezh...

  18. The DEVELOP National Program: Building Dual Capacity in Decision Makers and Young Professionals Through NASA Earth Observations

    Science.gov (United States)

    Childs, L. M.; Rogers, L.; Favors, J.; Ruiz, M.

    2012-12-01

    Through the years, NASA has played a distinct/important/vital role in advancing Earth System Science to meet the challenges of environmental management and policy decision making. Within NASA's Earth Science Division's Applied Sciences' Program, the DEVELOP National Program seeks to extend NASA Earth Science for societal benefit. DEVELOP is a capacity building program providing young professionals and students the opportunity to utilize NASA Earth observations and model output to demonstrate practical applications of those resources to society. Under the guidance of science advisors, DEVELOP teams work in alignment with local, regional, national and international partner organizations to identify the widest array of practical uses for NASA data to enhance related management decisions. The program's structure facilitates a two-fold approach to capacity building by fostering an environment of scientific and professional development opportunities for young professionals and students, while also providing end-user organizations enhanced management and decision making tools for issues impacting their communities. With the competitive nature and growing societal role of science and technology in today's global workplace, DEVELOP is building capacity in the next generation of scientists and leaders by fostering a learning and growing environment where young professionals possess an increased understanding of teamwork, personal development, and scientific/professional development and NASA's Earth Observation System. DEVELOP young professionals are partnered with end user organizations to conduct 10 week feasibility studies that demonstrate the use of NASA Earth science data for enhanced decision making. As a result of the partnership, end user organizations are introduced to NASA Earth Science technologies and capabilities, new methods to augment current practices, hands-on training with practical applications of remote sensing and NASA Earth science, improved remote

  19. Use of Program Theory in a Nutrition Program for Grandchildren and Grandparents

    Science.gov (United States)

    Koenings, Mallory; Arscott, Sara

    2013-01-01

    Grandparents University ® (GPU) is a 2-day campus-based nutrition education program for grandparents and grandchildren based on constructs from Social Cognitive Theory and the Theory of Planned Behavior. This article describes how program theory was used to develop a working model, design activities, and select outcome measures of a 2-day…

  20. AP1000 design and construction integration

    International Nuclear Information System (INIS)

    Winters, James W.; Clelland, Jill A.

    2004-01-01

    Construction costs of commercial nuclear generating plants must be reduced in order to expand the future use of nuclear energy. Two of the drivers of plant construction costs are the cost of financing during the construction duration and the substantial amount of skilled craft labor hours needed on site during construction. The application of information technology (IT) has been used to understand and reduce both of these drivers by establishing parallel construction paths using modules and integrating construction sequence review into the design process. In a program sponsored by EPRI, Westinghouse has modeled the construction of AP1000 in '4D' to show its viability, to improve its logic, to improve the plant design for constructibility and overall to reduce time and risk in the construction schedule. The design of most of AP1000 was constrained to be a duplicate of AP600 except where components required expansion for the higher power level. As a result, the construction schedule for AP1000 is as mature and as robust as that for AP600. Two areas important to the construction of AP1000 did require some design work because they could not remain the same as AP1000. First, the turbine building had to be redesigned to accommodate the larger turbine and its support systems. Again, as much of the AP600 design and philosophy as possible was retained. The building required enlargement and the basemat, foundations, steel structure and structural modules required modification. As concrete, steel, and equipment were defined by the designers, they were matched to the original AP600 turbine building schedule. This forced designers to assemble files to be consistent with building assembly activities and to think about constructibility as they defined the final design. Second, the reinforcement structure within the concrete under and supporting the containment vessel required detail design. Westinghouse was fortunate to have the constructor Obayashi of Japan recommend a detailed

  1. Interdisciplinary research: maintaining the constructive impulse in a culture of criticism

    Science.gov (United States)

    S.T.A. Pickett; William R. Burch; J. Morgan. Grove

    1999-01-01

    We approach the benefits and burdens of interdisciplinary research (IDR) from the perspective that science involves both constructive and critical approaches. The constructive aspect generates concepts, theories, and data to understand the observable world, while criticism tests the internal consistency of understanding and its fit to the observable world (Pickett and...

  2. Fiscal year 1995 well installation program summary Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1995-09-01

    This report summarizes the well installation activities conducted during the federal fiscal year (FY) 1995 drilling program at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee (including activities that were performed in late FY 1994, but not included in the FY 1994 Well Installation Program Summary Report). Synopses of monitoring well construction/well development data, well location rationale, geological/hydrological observations, quality assurance/quality control methods, and health and safety monitoring are included. Three groundwater monitoring wells and two gas monitoring probes were installed during the FY 1995 drilling program. One of the groundwater monitoring wells was installed at Landfill VI, the other two in the Boneyard/Burnyard area. All of the groundwater monitoring wells were constructed with stainless steel screens and casings. The two gas monitoring probes were installed at the Centralized Sanitary Landfill II and were of polyvinyl chloride (PVC) screened construction. Eleven well rehabilitation/redevelopment efforts were undertaken during FY 1995 at the Y-12 Plant. All new monitoring wells and wells targeted for redevelopment were developed by either a 2.0-in. diameter swab rig or by hand bailing until nonspecific parameters (pH and specific conductance) attained steady-state levels. Turbidity levels were lowered, if required, to the extent practicable by continued development beyond a steady-state level of pH and conductance

  3. Introducing ALAS: A Novel Agent-Oriented Programming Language

    Science.gov (United States)

    Mitrović, Dejan; Ivanović, Mirjana; Vidaković, Milan

    2011-09-01

    Agent-oriented programming languages represent a family of programming languages that provide developers with high-level abstractions and constructs necessary for implementing and using agent-related concepts. In this paper a novel agent-oriented programming language for rapid and efficient development of reactive agents, named ALAS, is presented. The simple, but powerful set of language constructs is designed to support the execution of agents in heterogenous environments, and to enable easy employment of advanced agent features, such as mobility and web service integration.

  4. Network design and operational modelling for construction green supply chain management

    Directory of Open Access Journals (Sweden)

    Pengfei Zhou Dong Chen

    2013-01-01

    Full Text Available Based on studying organizational structure of Construction Green Supply Chain Management (CGSCM, a mathematical programming model of CGSCM was proposed. The model aimed to maximize the aggregate profits of normalized construction logistics, the reverse logistics and the environmental performance. Numerical experiments show that the proposed approach can improve the aggregate profit effectively. In addition, return ratio, subsidies from governmental organizations, and environmental performance were analyzed for CGSCM performance. Herein, the proper return, subsidy and control strategy could optimize construction green supply chain.

  5. The Extension of the URF HADES: Realization and Observations

    International Nuclear Information System (INIS)

    Bastiaens, W; Demarche, M.

    2003-01-01

    An important step in the feasibility study of radioactive waste disposal in Boom Clay is the demonstration that we can construct galleries using industrial techniques, keeping the disturbance of the host-rock at an acceptable level for the long term safety of the disposal site. The successful construction of a connecting gallery of 85m in less than 6 weeks demonstrated the feasibility. To limit the disturbance, an expanding lining type was used: the wedge-block system; for the same reason, the lining was installed as soon as possible after excavation and a minimal excavation rate (2m/day) was imposed. The total radial convergence was limited to about 0.09m; the excavation radius was 2.445m. An extensive instrumentation and observation program accompanied the construction of the connecting gallery. Sensors measuring displacements, total pressure and pore water pressure were installed in the host rock to study the hydro-mechanical behavior of the clay when the gallery was excavated. Sensors in the tunneling shield gave information about the instantaneous convergence and excavation parameters. Strain gauges were placed in three sections of the lining to study the evolution of stresses in the lining with time. A systematic observation of the face and side-walls provided a useful database of the shape and orientation of encountered fractures. This way, the origin of the fractures can be explained and substantiated. The fractures were induced by differential stresses, about 6m ahead of the excavation face. No evidence of natural induced fractures was found. On the other hand, qualitative evidence of self healing and self-sealing of the host rock was encountered

  6. Effects of a Brief Psychoeducational Intervention for Family Conflict: Constructive Conflict, Emotional Insecurity and Child Adjustment.

    Science.gov (United States)

    Miller-Graff, Laura E; Cummings, E Mark; Bergman, Kathleen N

    2016-10-01

    The role of emotional security in promoting positive adjustment following exposure to marital conflict has been identified in a large number of empirical investigations, yet to date, no interventions have explicitly addressed the processes that predict child adjustment after marital conflict. The current study evaluated a randomized controlled trial of a family intervention program aimed at promoting constructive marital conflict behaviors thereby increasing adolescent emotional security and adjustment. Families (n = 225) were randomized into 1 of 4 conditions: Parent-Adolescent (n = 75), Parent-Only (n = 75), Self-Study (n = 38) and No Treatment (n = 37). Multi-informant and multi-method assessments were conducted at baseline, post-treatment and 6-month follow-up. Effects of treatment on destructive and constructive conflict behaviors were evaluated using multilevel models where observations were nested within individuals over time. Process models assessing the impact of constructive and destructive conflict behaviors on emotional insecurity and adolescent adjustment were evaluated using path modeling. Results indicated that the treatment was effective in increasing constructive conflict behaviors (d = 0.89) and decreasing destructive conflict behaviors (d = -0.30). For the Parent-Only Group, post-test constructive conflict behaviors directly predicted lower levels of adolescent externalizing behaviors at 6-month follow-up. Post-test constructive conflict skills also indirectly affected adolescent internalizing behaviors through adolescent emotional security. These findings support the use of a brief psychoeducational intervention in improving post-treatment conflict and emotional security about interparental relationships.

  7. Technology programs in support of advanced light water reactor plants: Construction

    International Nuclear Information System (INIS)

    Eichen, E.P.

    1989-01-01

    Under Contract No. AC03-86SF16565, Stone ampersand Webster Engineering Corporation (SWEC) is conducting several independent, yet interrelated, studies of light water reactor plants to improve constructibility and quality, to reduce costs and schedule durations, and to simplify design. This document discusses design requirements. 36 refs., 57 figs., 56 tabs

  8. Compiling the parallel programming language NestStep to the CELL processor

    OpenAIRE

    Holm, Magnus

    2010-01-01

    The goal of this project is to create a source-to-source compiler which will translate NestStep code to C code. The compiler's job is to replace NestStep constructs with a series of function calls to the NestStep runtime system. NestStep is a parallel programming language extension based on the BSP model. It adds constructs for parallel programming on top of an imperative programming language. For this project, only constructs extending the C language are relevant. The output code will compil...

  9. Nuclear Power Infrastructure Development Program: Korean Education Program

    International Nuclear Information System (INIS)

    Choi, Sung Yeol; Hwang, Il Soon; Kim, Si Hwan

    2009-01-01

    Many countries have decided nuclear power for next energy resources as one of the long-term energy supply options. IAEA projected nuclear power expansion up to 2030 reaching between 447 GWe and 691 GWe compared to 370 GWe and 2660 TWh at the end of 2006. Both low and high projection is accompanied with new nuclear power plant constructions respectively 178 and 357, about 11 units per year, and most new construction is in North America, the Far East, Eastern Europe, the Middle East, and Southeast Asia. During the last forty years, thirty three countries have established commercial nuclear power programs but only some of them have developed comprehensive and large scale peaceful nuclear power infrastructure. Although various cooperation and guidance program of nuclear power infrastructure, developing appropriate environment and infrastructure of nuclear power plant is still challenging problems for developing countries launching nuclear power program. With increasing the demand of safety and safeguard from international society, creating appropriate infrastructure becomes essential requirements in national nuclear power program. In the viewpoint of developing countries, without sufficient explanation and proper guidance, infrastructure could be seen only as another barrier in its nuclear power program. The importance of infrastructure development would be obscured by ostensible business and infrastructure program can result in increasing entering barriers to peaceful nuclear power application field without benefits to developing countries and international community. To avoid this situation by providing enough explanation and realistic case example and cooperate with the countries wanting to establish comprehensive nuclear power infrastructure in the peaceful applications, we are creating the education program of infrastructure development with basic guidelines of the IAEA infrastructure series and Korean experiences from least developed country to advanced country

  10. Occupational safety issues in residential construction surveyed in Wisconsin, United States.

    Science.gov (United States)

    Choi, Sang D; Carlson, Kathryn

    2014-01-01

    Residential construction is a high-risk industry in the U.S. due to the exposure to work-related safety hazards and fall injuries. This study aimed to examine the safety training and safe work practices of construction workers within the small residential construction industry. In order to achieve the study objectives, a survey was designed and sent to approximately 200 Wisconsin based residential construction contractors. About one third of the respondents stated that they did not have any form of safety programs. The study indicated that the most common types of work-related injuries in residential construction were slips/trips/falls and cuts/lacerations. The survey findings also suggested that the residential construction contractors needed to increase the utilization of fall protection safety equipment. Further education and subject matter expert training could provide benefits to improve occupational safety and health of the small business workforce in the residential construction industry.

  11. OBPRELIM Observer Preliminary Data System

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Paper logs are the primary data collection tool used by observers of the Northeast Fisheries Observer Program and Industry Funded Scallop Program deployed on...

  12. Construction management of Indian pressurized heavy water reactors

    International Nuclear Information System (INIS)

    Bohra, S.A.; Sharma, P.D.

    2006-01-01

    Pandit Jawaharlal Nehru and Dr. Homi J. Bhabha, the visionary architects of Science and Technology of modern India foresaw the imperative need to establish a firm base for indigenous research and development in the field of nuclear electricity generation. The initial phase has primarily focused on the technology development in a systematic and structured manner, which has resulted in establishment of strong engineering, manufacturing and construction base. The nuclear power program started with the setting up of two units of boiling light water type reactors in 1969 for speedy establishment of nuclear technology, safety culture, and development of operation and maintenance manpower. The main aim at that stage was to demonstrate (to ourselves, and indeed to the rest of the world) that India, inspite of being a developing country, with limited industrial infrastructure and low capacity power grids, could successfully assimilate the high technology involved in the safe and economical operation of nuclear power reactors. The selection of a BWR was in contrast to the pressurized heavy water reactors (PHWR), which was identified as the flagship for the first stage of India's nuclear power program. The long-term program in three stages utilizes large reserves of thorium in the monazite sands of Kerala beaches in the third stage with first stage comprising of series of PHWR type plants with a base of 10,000 MW. India has at present 14 reactors in operation 12 of these being of PHWR type. The performance of operating units of 2720 MW has improved significantly with an overall capacity factor of about 90% in recent times. The construction work on eight reactor units with installed capacity of 3960 MW (two PHWRs of 540 MW each, four PHWRs of 220 MW each and two VVERs of 1000 MW each) is proceeding on a rapid pace with project schedules of less than 5 years from first pour of concrete. This is being achieved through advanced construction technology and management. Present

  13. CONSTRUCTION OF AN EARTH MODEL: ANALYSIS OF EXOPLANET LIGHT CURVES AND MAPPING THE NEXT EARTH WITH THE NEW WORLDS OBSERVER

    International Nuclear Information System (INIS)

    Oakley, P. H. H.; Cash, W.

    2009-01-01

    The orbital light curve of a terrestrial exoplanet will likely contain valuable information about the surface and atmospheric features of the planet, both in its overall shape and hourly variations. We have constructed an empirically based code capable of simulating observations of the Earth from any orientation, at any time of year with continuously updated cloud and snow coverage with a New Worlds Observatory. By simulating these observations over a full orbital revolution at a distance of 10 pc we determine that the detection of an obliquity or seasonal terrain change is possible at low inclinations. In agreement with other studies, a 4 m New Worlds Observer can accurately determine the rotation rate of the planet at a success rate from ∼30% to 80% with only 5 days of observations depending on the signal to noise of the observations. We also attempt simple inversions of these diurnal light curves to sketch a map of the reflecting planet's surface features. This mapping technique is only successful with highly favorable systems and in particular requires that the cloud coverage must be lower than the Earth's average. Our test case of a 2 M + planet at 7 pc distance with low exo-zodiacal light and 25% cloud coverage produced crude, but successful results. Additionally, with these highly favorable systems NWO may be able to discern the presence of liquid surface water (or other smooth surfaces) though it requires a complex detection available only at crescent phases in high inclination systems.

  14. PROVISION FOR ECONOMIC STABILITY OF CONSTRUCTION ENTERPRISES UNDER CONDITIONS OF UNSTABLE RUSSIAN ECONOMY

    Directory of Open Access Journals (Sweden)

    M. A. Kaminsky

    2012-01-01

    Full Text Available Construction enterprise economic stability is determined as condition at which there is most coordinated interaction of all activity components(financing, manufacturing, human resources, marketing, investment and management. Construction enterprise stability enhancing may beachieved through the implementation of adaptation programs. A mechanism of the impact on economic stability of individual components is described which makes it possible to increase overall stability of the construction company in different situations.

  15. Social construction of American sign language--English interpreters.

    Science.gov (United States)

    McDermid, Campbell

    2009-01-01

    Instructors in 5 American Sign Language--English Interpreter Programs and 4 Deaf Studies Programs in Canada were interviewed and asked to discuss their experiences as educators. Within a qualitative research paradigm, their comments were grouped into a number of categories tied to the social construction of American Sign Language--English interpreters, such as learners' age and education and the characteristics of good citizens within the Deaf community. According to the participants, younger students were adept at language acquisition, whereas older learners more readily understood the purpose of lessons. Children of deaf adults were seen as more culturally aware. The participants' beliefs echoed the theories of P. Freire (1970/1970) that educators consider the reality of each student and their praxis and were responsible for facilitating student self-awareness. Important characteristics in the social construction of students included independence, an appropriate attitude, an understanding of Deaf culture, ethical behavior, community involvement, and a willingness to pursue lifelong learning.

  16. Supporting secure programming in web applications through interactive static analysis.

    Science.gov (United States)

    Zhu, Jun; Xie, Jing; Lipford, Heather Richter; Chu, Bill

    2014-07-01

    Many security incidents are caused by software developers' failure to adhere to secure programming practices. Static analysis tools have been used to detect software vulnerabilities. However, their wide usage by developers is limited by the special training required to write rules customized to application-specific logic. Our approach is interactive static analysis, to integrate static analysis into Integrated Development Environment (IDE) and provide in-situ secure programming support to help developers prevent vulnerabilities during code construction. No additional training is required nor are there any assumptions on ways programs are built. Our work is motivated in part by the observation that many vulnerabilities are introduced due to failure to practice secure programming by knowledgeable developers. We implemented a prototype interactive static analysis tool as a plug-in for Java in Eclipse. Our technical evaluation of our prototype detected multiple zero-day vulnerabilities in a large open source project. Our evaluations also suggest that false positives may be limited to a very small class of use cases.

  17. Historical Perspective on the United States Fusion Program

    International Nuclear Information System (INIS)

    Dean, Stephen O.

    2005-01-01

    Progress and Policy is traced over the approximately 55 year history of the U. S. Fusion Program. The classified beginnings of the effort in the 1950s ended with declassification in 1958. The effort struggled during the 1960s, but ended on a positive note with the emergence of the tokamak and the promise of laser fusion. The decade of the 1970s was the 'Golden Age' of fusion, with large budget increases and the construction of many new facilities, including the Tokamak Fusion Test Reactor (TFTR) and the Shiva laser. The decade ended on a high note with the passage of the Magnetic Fusion Energy Engineering Act of 1980, overwhelming approved by Congress and signed by President Carter. The Act called for a '$20 billion, 20 year' effort aimed at construction of a fusion Demonstration Power Plant around the end of the century. The U. S. Magnetic Fusion Energy program has been on a downhill slide since 1980, both in terms of budgets and the construction of new facilities. The Inertial Confinement Fusion program, funded by Department of Energy Defense Programs, has faired considerably better, with the construction of many new facilities, including the National Ignition Facility (NIF)

  18. Construction Cluster Volume I [Wood Structural Framing].

    Science.gov (United States)

    Pennsylvania State Dept. of Justice, Harrisburg. Bureau of Correction.

    The document is the first of a series, to be integrated with a G.E.D. program, containing instructional materials at the basic skills level for the construction cluster. It focuses on wood structural framing and contains 20 units: (1) occupational information; (2) blueprint reading; (3) using leveling instruments and laying out building lines; (4)…

  19. Choreographic Programming

    DEFF Research Database (Denmark)

    Montesi, Fabrizio

    , as they offer a concise view of the message flows enacted by a system. For this reason, in the last decade choreographies have been used in the development of programming languages, giving rise to a programming paradigm that in this dissertation we refer to as Choreographic Programming. Recent studies show...... endpoint described in a choreography can then be automatically generated, ensuring that such implementations are safe by construction. However, current formal models for choreographies do not deal with critical aspects of distributed programming, such as asynchrony, mobility, modularity, and multiparty...... sessions; it remains thus unclear whether choreographies can still guarantee safety when dealing with such nontrivial features. This PhD dissertation argues for the suitability of choreographic programming as a paradigm for the development of safe distributed systems. We proceed by investigating its...

  20. Understanding the Front-end of Large-scale Engineering Programs

    DEFF Research Database (Denmark)

    Lucae, Sebastian; Rebentisch, Eric; Oehmen, Josef

    2014-01-01

    Large engineering programs like sociotechnical infrastructure constructions of airports, plant constructions, or the development of radically innovative, high-tech industrial products such as electric vehicles or aircraft are affected by a number of serious risks, and subsequently commonly suffer...... from large cost overruns. Significant problems in program execution can be traced back to practices performed, or more frequently not performed, in the so-called “fuzzy front end” of the program. The lack of sufficient and effective efforts in the early stages of a program can result in unstable......, unclear and incomplete requirements, unclear roles and responsibilities within the program organization, insufficient planning, and unproductive tensions between program management and systems engineering. This study intends to clarify the importance of up-front planning to improve program performance...

  1. An Algebra for Program Fragments

    DEFF Research Database (Denmark)

    Kristensen, Bent Bruun; Madsen, Ole Lehrmann; Møller-Pedersen, Birger

    1985-01-01

    Program fragments are described either by strings in the concrete syntax or by constructor applications in the abstract syntax. By defining conversions between these forms, both may be intermixed. Program fragments are constructed by terminal and nonterminal symbols from the grammar and by variab...

  2. China's nuclear programs and policies

    International Nuclear Information System (INIS)

    Wang, C.

    1983-01-01

    Economics and the futility of arms competition with the US and USSR has forced China to shift its nuclear effort to peaceful uses, although its current nuclear-deterrent warrants including China in arms negotiations. China's nuclear program began during the 1950s with an emphasis on weaponry and some development in space technology. Proponents of nuclear power now appear to have refuted the earlier arguments that nuclear-plant construction would be too slow, too dangerous and polluting, and too expensive and the idea that hydro resources would be adequate. The current leadership supports a serious nuclear-power-plant construction program. 6 references

  3. Promoting a Hand Hygiene Program Using Social Media: An Observational Study.

    Science.gov (United States)

    Pan, Sung-Ching; Sheng, Wang-Huei; Tien, Kuei-Lien; Chien, Kuang-Tse; Chen, Yee-Chun; Chang, Shawn-Chwen

    2016-01-01

    Hand hygiene is an important component in infection control to protect patient safety and reduce health care-associated infection. Our aim was to evaluate the efficacy of different social media on the promotion of a hand hygiene (HH) program. The observational study was conducted from May 5 to December 31, 2014, at a 2600-bed tertiary care hospital. A 3-minute video of an HH campaign in 8 languages was posted to YouTube. The Chinese version was promoted through three platforms: the hospital website, the hospital group email, and the Facebook site of a well-known Internet illustrator. The video traffic was analyzed via Google Analytics. HH compliance was measured in November 2013 and 2014. There were 5252 views of the video, mainly of the Chinese-language version (3509/5252, 66.81%). The NTUH website had 24,000 subscribers, and 151 of them viewed the video (connection rate was 151/24,000, 0.63%). There were 9967 users of the hospital email group and the connection rate was 0.91% (91/9967). The connection rate was 6.17% (807/13,080) from Facebook, significantly higher than the other 2 venues (both P<.001). HH compliance sustained from 83.7% (473/565) in 2013 to 86.7% (589/679) in 2014 (P=.13) among all HCWs. Facebook had the highest connection rate in the HH video campaign. The use of novel social media such as Facebook should be considered for future programs that promote hand hygiene and other healthy behaviors.

  4. Management for Construction Materials and Control of Construction Waste in Construction Industry: A Review

    OpenAIRE

    A. A. Gulghane; Prof P. V. Khandve

    2015-01-01

    In recent treads a wide range of building materials is available for the construction of civil engineering structures. The total cost of materials may be up to 60% or more of the total cost incurred in construction project dependent upon the type of project. Effective construction materials management is a key to success for a construction project. Construction waste is another serious problem in construction industry. A large and various types of construction waste with different...

  5. Ultradeep Near-Infrared ISAAC Observations of the Hubble Deep Field South: Observations, Reduction, Multicolor Catalog, and Photometric Redshifts

    Science.gov (United States)

    Labbé, Ivo; Franx, Marijn; Rudnick, Gregory; Schreiber, Natascha M. Förster; Rix, Hans-Walter; Moorwood, Alan; van Dokkum, Pieter G.; van der Werf, Paul; Röttgering, Huub; van Starkenburg, Lottie; van der Wel, Arjen; Kuijken, Konrad; Daddi, Emanuele

    2003-03-01

    We present deep near-infrared (NIR) Js-, H-, and Ks-band ISAAC imaging of the Wide Field Planetary Camera 2 (WFPC2) field of the Hubble Deep Field South (HDF-S). The 2.5‧×2.5‧ high Galactic latitude field was observed with the Very Large Telescope under the best seeing conditions, with integration times amounting to 33.6 hr in Js, 32.3 hr in H, and 35.6 hr in Ks. We reach total AB magnitudes for point sources of 26.8, 26.2, and 26.2, respectively (3 σ), which make it the deepest ground-based NIR observation to date and the deepest Ks-band data in any field. The effective seeing of the co-added images is ~0.45" in Js, ~0.48" in H, and ~0.46" in Ks. Using published WFPC2 optical data, we constructed a Ks-limited multicolor catalog containing 833 sources down to Ktots,AB2.3 (in Johnson magnitudes). Because they are extremely faint in the observed optical, they would be missed by ultraviolet-optical selection techniques, such as the U-dropout method. Based on service mode observations collected at the European Southern Observatory, Paranal, Chile (ESO Program 164.O-0612). Also based on observations with the NASA/ESA Hubble Space Telescope, obtained at the Space Telescope Science Institute, which is operated by the Association of Universities for Research in Astronomy (AURA), Inc., under NASA contract NAS 5-26555.

  6. Hydromechanical properties of some mortars used in some ecologic construction techniques

    OpenAIRE

    Hoxha , Dashnor; Vladimir Nicolae , Ungureanu; Belayachi , Naima; Duc Phi , Do

    2012-01-01

    International audience; This paper presents results of hydromechanical characterization tests performed on some mortars used in eco-construction practice. Typically, such mortars could be found in buildings constructed following so called GREB technique that uses straw bales as structural and insulating elements in addition to a wood frame. The full experimental program includes thermal, mechanical and hydraulic - hygroscopic tests. Mechanical tests, including uniaxial compression test and th...

  7. Preparing astronomical observations and observing with OHP facilities

    Directory of Open Access Journals (Sweden)

    Patris J.

    2010-12-01

    Full Text Available In addition to the general introduction to observational astronomy given in a past paper (J. Phys. IV France, ERCA 07 (2006 pp 373-390 some tools are given to the observer. These include the general knowledge of what is going to be observed and of the instruments used. A guideline is given to prepare an observing program and to follow it as efficiently as possible. Finally, some examples are given of observations to be made by ERCA participants at OHP observatory.

  8. Constructing an Educational Mars Simulation

    Science.gov (United States)

    Henke, Stephen A.

    2004-01-01

    January 14th 2004, President George Bush announces his plans to catalyst the space program into a new era of space exploration and discovery. His vision encompasses a robotics program to explore our solar system, a return to the moon, the human exploration of Mars, and to promote international prosperity towards our endeavors. We at NASA now have the task of constructing this vision in a very real timeframe. I have been chosen to begin phase 1 of making this vision a reality. I will be working on creating an Educational Mars Simulation of human exploration of Mars to stimulate interest and involvement with the project from investors and the community. GRC s Computer Services Division (CSD) in collaboration with the Office of Education Programs will be designing models, constructing terrain, and programming this simulation to create a realistic portrayal of human exploration on mars. With recent and past technological breakthroughs in computing, my primary goal can be accomplished with only the aid of 3-4 software packages. Lightwave 3D is the modeling package we have selected to use for the creation of our digital objects. This includes a Mars pressurized rover, rover cockpit, landscape/terrain, and habitat. Once we have the models completed they need textured so Photoshop and Macromedia Fireworks are handy for bringing these objects to life. Before directly importing all of this data into a simulation environment, it is necessary to first render a stunning animation of the desired final product. This animation with represent what we hope to capture out of the simulation and it will include all of the accessories like ray-tracing, fog effects, shadows, anti-aliasing, particle effects, volumetric lighting, and lens flares. Adobe Premier will more than likely be used for video editing and adding ambient noises and music. Lastly, V-Tree is the real-time 3D graphics engine which will facilitate our realistic simulation. Additional information is included in the

  9. 25 CFR 170.500 - What program reviews do the Secretaries conduct?

    Science.gov (United States)

    2010-04-01

    ... planning; (3) Design; (4) Contract administration; (5) Construction; (6) Financial management; and (7) Systems management and existing stewardship agreements. (c) After the IRR process review, the review team... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities...

  10. Probabilistic Programming (Invited Talk)

    OpenAIRE

    Yang, Hongseok

    2017-01-01

    Probabilistic programming refers to the idea of using standard programming constructs for specifying probabilistic models from machine learning and statistics, and employing generic inference algorithms for answering various queries on these models, such as posterior inference and estimation of model evidence. Although this idea itself is not new and was, in fact, explored by several programming-language and statistics researchers in the early 2000, it is only in the last few years that proba...

  11. Programming in Fortran M

    Energy Technology Data Exchange (ETDEWEB)

    Foster, I.; Olson, R.; Tuecke, S.

    1993-08-01

    Fortran M is a small set of extensions to Fortran that supports a modular approach to the construction of sequential and parallel programs. Fortran M programs use channels to plug together processes which may be written in Fortran M or Fortran 77. Processes communicate by sending and receiving messages on channels. Channels and processes can be created dynamically, but programs remain deterministic unless specialized nondeterministic constructs are used. Fortran M programs can execute on a range of sequential, parallel, and networked computers. This report incorporates both a tutorial introduction to Fortran M and a users guide for the Fortran M compiler developed at Argonne National Laboratory. The Fortran M compiler, supporting software, and documentation are made available free of charge by Argonne National Laboratory, but are protected by a copyright which places certain restrictions on how they may be redistributed. See the software for details. The latest version of both the compiler and this manual can be obtained by anonymous ftp from Argonne National Laboratory in the directory pub/fortran-m at info.mcs.anl.gov.

  12. Situation thinking as an aid to organizing and planning the construction effort

    International Nuclear Information System (INIS)

    Stull, J.O.

    1976-01-01

    Constructibility of a nuclear project design can be improved by assigning experienced construction men to work with the design engineers. A construction sequence can be developed using a small scale model simulating the various stages of construction. Seeing a simulated situation dictates a conclusion to the experienced construction man which can be explained and is usually acceptable to all. The result is a unified team effort and a good constructible design. Photos of the model in a Work Plan Book provide an effective medium for transferring this planned sequence to the constructor. Slides can quickly express the plan to management and the client. Working with engineers on design models and using a standard identification program for systems and buildings can be an aid to construction. Cross-reference requirements which complicate field and office work can be minimized by developing standard identifiers for buildings and systems. Review of design models by construction men can provide access for construction, eliminate delays and costly out-of-sequence work

  13. Discursive constructions of falls prevention : Discourses of active aging versus old age as disease

    DEFF Research Database (Denmark)

    Evron, Lotte; Ulrich, Anita; Tanggaard, Lene

    2012-01-01

    information and investment in falls prevention programs, many still drop out or decline to participate in such programs. The study explores how discourses cross swords in the domain of falls prevention. We identify two main discourses in the field: Discourses of active aging opposed to discourses of old age...... as disease. In discourses of active aging falls are constructed as preventable and not necessarily related to old age; in discourses of old age as disease falls are constructed as a disease of old age. Specific agent positions are created within discourses. Discourses of active aging construct self......-responsible citizens who are physically active and motivated to participate in falls prevention programmes; discourses of old age as disease on the other hand construct “fall patients” who accept being passive in the health care system. Older citizens who are not in need of treatment or less physically active...

  14. The Climate Variability & Predictability (CVP) Program at NOAA - Observing and Understanding Processes Affecting the Propagation of Intraseasonal Oscillations in the Maritime Continent Region

    Science.gov (United States)

    Lucas, S. E.

    2017-12-01

    The Climate Variability & Predictability (CVP) Program supports research aimed at providing process-level understanding of the climate system through observation, modeling, analysis, and field studies. This vital knowledge is needed to improve climate models and predictions so that scientists can better anticipate the impacts of future climate variability and change. To achieve its mission, the CVP Program supports research carried out at NOAA and other federal laboratories, NOAA Cooperative Institutes, and academic institutions. The Program also coordinates its sponsored projects with major national and international scientific bodies including the World Climate Research Programme (WCRP), the International and U.S. Climate Variability and Predictability (CLIVAR/US CLIVAR) Program, and the U.S. Global Change Research Program (USGCRP). The CVP program sits within NOAA's Climate Program Office (http://cpo.noaa.gov/CVP). In 2017, the CVP Program had a call for proposals focused on observing and understanding processes affecting the propagation of intraseasonal oscillations in the Maritime Continent region. This poster will present the recently funded CVP projects, the expected scientific outcomes, the geographic areas of their work in the Maritime Continent region, and the collaborations with the Office of Naval Research, Indonesian Agency for Meteorology, Climatology and Geophysics (BMKG), Japan Agency for Marine-Earth Science and Technology (JAMSTEC) and other partners.

  15. The strategy of obesity management: the results of All-Russian observational program “Primavera”

    Directory of Open Access Journals (Sweden)

    Ivan I. Dedov

    2016-07-01

    Full Text Available Introduction. The prevalence of obesity and associated comorbidities is comparable to the scale of the epidemic. Along with the change in lifestyle, pharmacotherapy is necessary to lead obesity patients to a healthier state. Aim. The evaluation of efficacy and safety of Reduxin® (sibutramine + microcrystalline cellulose application among patients with alimentary obesity and comorbidities in routine clinical practice. Analysis of results of Primavera program. Materials and methods. The observation program Primavera was conducted since November 2012 to July 2015 under the auspices of Endocrinology Research Centre and the Russian Association of Endocrinologists. The program "Primavera" was attended by 3095 doctors of various specialties and 98.774 patients being treated in 1272 hospitals in 142 Russian cities. The average age of the patients was 39.4 ± 10.4 years, the ratio of male / female – 17.7%/82,3%, the average body mass – 99.1±14.28 kg, the average BMI – 35.7±4.41 kg/m2, the average waist circumstance – 105.7±13.7 cm. The Duration of Reduxine® treatment was determined by the attending physician and ranged from 3 months to 1 year. Results. The duration of therapy was 3 months for 3% of patients, 6 months for 59.3% of patients, 12 months for 37.7% of patients. The BMI reducing dynamics during 3, 6, 12 months was 3.4±1.53 kg/m2 (average 9.5±4.28 kg, 5.4±2.22 kg/m2 (15.0±6.22 kg, 7.2±3.07 kg/m2 (20.0±8.62 kg respectively. The average waist circumference reduction for 3, 6 and 12 months was 6.3±4.31 sm, 10.6±6.30 sm, 16.0±8.94 sm, respectively. It was shown that the weight loss during prolonged (more than six months Reduxine therapy under the supervision of a physician was associated with decreased levels of systolic and diastolic blood pressure and had no affect on heart rate. Adverse events were reported for 4.1% of patients, according to doctors, the cause-effect relationship with the use of Reduxine can be estimated as

  16. Repository construction management and quality assurance

    International Nuclear Information System (INIS)

    Hood, F.C.

    1984-01-01

    An emphasis on preventive rather than reactive management is key to an efficient construction management operation. Development of contingency plans to deal with unexpected adverse conditions, e.g., brine pockets during mining operations, are an integral part of the management program to ensure project safety, quality, cost, schedule and environmental objectives are met. A viable quality assurance program with active management support will optimize management effectiveness in reaching project goals. With adequate planning and perceptive application of the proper management controls, Quality Assurance becomes an essential ingredient for efficiently managing a job because it has been built into the management system rather than being an uninvolved peripheral entity. 6 references, 3 figures

  17. 31 CFR 501.703 - Overview of civil penalty process and construction of rules.

    Science.gov (United States)

    2010-07-01

    ... process and construction of rules. (a) The administrative process for enforcing TWEA sanctions programs... 31 Money and Finance: Treasury 3 2010-07-01 2010-07-01 false Overview of civil penalty process and construction of rules. 501.703 Section 501.703 Money and Finance: Treasury Regulations Relating to Money and...

  18. C++ how to program

    CERN Document Server

    Deitel, Paul J

    2014-01-01

    This best-selling comprehensive text is aimed at readers with little or no programming experience. It teaches programming by presenting the concepts in the context of full working programs and takes an early-objects approach. The authors emphasize achieving program clarity through structured and object-oriented programming, software reuse and component-oriented software construction. The Ninth Edition encourages students to connect computers to the community, using the Internet to solve problems and make a difference in our world. All content has been carefully fine-tuned in response to a team of distinguished academic and industry reviewers.

  19. Program Perceived Value and Program Satisfaction Influences on Store Loyalty: Insights from Retail Loyalty Progam

    OpenAIRE

    Omar, Nor Asiah; Musa, Rosidah; Nazri, Muhamad Azrin

    2007-01-01

    Investigations to determine whether program perceived value could influence program satisfaction, program card loyalty and store loyalty are critical to elucidate the roles and significance of the constructs and advancing management practice. Accordingly, in line with this research direction, this study aims to assess the effects of program perceived value offered by few leading retail superstores and departmental stores in Malaysia on its members’ loyalty towards the store. The data set util...

  20. High-rise construction in the Russian economy: modeling of management decisions

    Science.gov (United States)

    Miroshnikova, Tatyana; Taskaeva, Natalia

    2018-03-01

    The growth in the building industry, particularly in residential high-rise construction, is having considerable influence on the country's economic development. The scientific hypothesis of the research is that the execution of town-planning programs of high-rise construction depends to a large extent on the management of the provision of material resources for the construction of a millionth city, while the balance model is the most important tool for establishing and determining the ratio between supply and demand for material resources. In order to improve the efficiency of high-rise building management, it is proposed to develop a methodology for managing the provision of construction of large cities with material resources.

  1. Current situation and countermeasures of port logistics park information construction

    Directory of Open Access Journals (Sweden)

    Zhen Liu

    2013-03-01

    Full Text Available Purpose: Improve work efficiency of logistics park department, and drive the economy of the park and its surrounding areas. Design/methodology/approach: Analyze the information development situation and existent questions of current national logistics park, and design proper scheme to meet the demand of port logistics park. Findings: Proposed an information construction implementation plan using technology of the Internet of things which can be applied to port logistics park. Designed a scheme for the park information construction and explained the system's implementation strategy and implementation steps. Practical implications: The proposed construction program is particularly suitable for the northwest port logistics parks in China, and also has reference function to other logistics park construction. Originality/value: Group the information construction of the logistics park into four levels, three types of users, and two requirements. The scheme is innovative and comprehensive, which can ensure the development of port logistics park.

  2. Citizen Scientist Contributions to Observations Benefiting the Earth through the GLOBE Program

    Science.gov (United States)

    Chambers, L. H.; Riebeek Kohl, H.; Murphy, A.; Butler, D. M.

    2017-12-01

    Citizen science has proliferated recently due to widespread use of the internet and mobile devices, but it has a long history (i.e., the Christmas Bird Count). Since the mid-1990s, the GLOBE Program has engaged participants at a global scale. Though initially focused on teachers and students in formal education settings, it quickly attracted interest from the public as well. In 2016, GLOBE formally launched an initiative to widely engage citizen scientists in its 117 countries through release of a mobile app called GLOBE Observer (GO). GO seeks to increase the number and distribution of participants by providing a simple, engaging - and fun - interface to collect and report data. Observations featured in the app are a carefully selected subset of 50+ GLOBE measurement protocols. They must leverage app features, require little to no equipment besides the mobile device, and have scientists or other stakeholders ready to use the data. The app is designed to minimize barriers to participation, but for those who want to do or know more GLOBE also offers on-line training to turn observers into community members with recognized certification in a protocol area. First released was a cloud observation protocol, supporting validation of a variety of Earth imaging sensors. Second was a mosquito habitat mapping protocol, poised to greatly increase the amount and distribution of local data to validate disease forecast models based on remotely sensed conditions, with additional focus on eliminating disease-carrying mosquito breeding sites. Next in development is a land cover protocol to obtain ground truth imagery for the Landsat science team. The app is also being leveraged for quick development of a short-term eclipse mini-app, to be used on August 21st only during the North American eclipse. This app is designed to make it easy for large numbers of people observing the eclipse, throughout North America, to take and record high time resolution observations of cloud cover and

  3. Measurements of 427 Double Stars With Speckle Interferometry: The Winter/Spring 2017 Observing Program at Brilliant Sky Observatory, Part 1

    Science.gov (United States)

    Harshaw, Richard

    2018-04-01

    In the winter and spring of 2017, an aggressive observing program of measuring close double stars with speckle interferometry and CCD imaging was undertaken at Brilliant Sky Observatory, my observing site in Cave Creek, Arizona. A total of 596 stars were observed, 8 of which were rejected for various reasons, leaving 588 pairs. Of these, 427 were observed and measured with speckle interferometry, while the remaining 161 were measured with a CCD. This paper reports the results of the observations of the 427 speckle cases. A separate paper in this issue will report the CCD measurements of the 161 other pairs.

  4. NCSX Construction Progress and Research Plans

    International Nuclear Information System (INIS)

    Neilson, G.H.; Heitzenroeder, P.; Lyon, J.; Nelson, B.; Reiersen, W.; Zarnstorff, M.

    2005-01-01

    Stellarators use 3D plasma and magnetic field shaping to produce a steady-state disruption-free magnetic confinement configuration. Compact stellarators have additional attractive properties, quasi-symmetric magnetic fields and low aspect ratio. The National Compact Stellarator Experiment (NCSX) is being constructed at the Princeton Plasma Physics Laboratory (PPPL) in partnership with the Oak Ridge National Laboratory (ORNL) to test the physics of a high-beta compact stellarator with a low-ripple, tokamak-like magnetic configuration. The engineering challenges of NCSX stem from its complex geometry requirements. These issues are addressed in the construction project through manufacturing R and D and system engineering. As a result, the fabrication of the coil winding forms and vacuum vessel are proceeding in industry without significant technical issues, and preparations for winding the coils at PPPL are in place. Design integration, analysis, and dimensional control are functions provided by system engineering to ensure that the finished product will satisfy the physics requirements, especially accurate realization of the specified coil geometries. After completion of construction in 2009, a research program to test the expected physics benefits will start

  5. ERDA LWR plant technology program: role of government/industry in improving LWR performance

    International Nuclear Information System (INIS)

    1975-01-01

    Information is presented under the following chapter headings: executive summary; LWR plant outages; LWR plant construction delays and cancellations; programs addressing plant outages, construction delays, and cancellations; need for additional programs to remedy continuing problems; criteria for government role in LWR commercialization; and the proposed government program

  6. New technologies for lower-cost design and construction of new nuclear power plants. Annex 20

    International Nuclear Information System (INIS)

    Ritterbusch, S.E.; Bryan, R.E.; Harmon, D.L.

    2002-01-01

    Electric Power Research Institute studies indicate that in order to be competitive with gas-fired electric power plant capital costs, new nuclear plant capital cost in the USA must be decreased by at least 35% to 40% relative to costs of some Advanced Light Water Reactors designed in the early 1990s. To address this need, the U. S. Department of Energy is sponsoring three separate projects under its Nuclear Energy Research Initiative. These projects are the Risk-Informed Assessment of Regulatory and Design Requirements for Future Nuclear Power Plants, the Smart Equipment Nuclear Power Plant Program, and the Design, Procure, Construct, Install and Test Program. The goal of the Design-Construction program is reduction of the complete nuclear plant design-procure-construct-install-test cycle schedule and cost. A 3D plant model was combined with a construction schedule to produce a 4D visualization of plant construction, which was then used to analyze plant construction methods. Insights include the need for concurrent engineering, a plant-wide central database, and use of the World-Wide WEB. The goal of Smart Equipment program is to design, develop, and evaluate the methods for implementing smart equipment and predictive maintenance technology. 'Smart' equipment means components and systems that are instrumented and monitored to detect incipient failures in order to improve their reliability. The resulting smart equipment methods will be combined with a more risk-informed regulatory approach to allow plant designers to (1) simplify designs without compromising overall reliability and safety and (2) maintain more reliable plants at lower cost. Initial results show that rotating equipment such as charging pumps would benefit most from smart instrumentation and that the technique of Bayesian Belief Networks would be most appropriate for providing input to a health monitoring system. (author)

  7. Programs of the Materials and Radiation Effects Branch

    International Nuclear Information System (INIS)

    Dalder, E.N.C.

    1976-01-01

    This report describes specific efforts devoted to resolving fusion reactor materials needs as they relate to major fusion power program objectives and construction of major fusion facilities. Summaries of ERDA-sponsored research being conducted on the following areas are given: surface program, bulk irradiation program, dosimetry program, materials selection and development program, and neutron source development program

  8. Stochastic control theory dynamic programming principle

    CERN Document Server

    Nisio, Makiko

    2015-01-01

    This book offers a systematic introduction to the optimal stochastic control theory via the dynamic programming principle, which is a powerful tool to analyze control problems. First we consider completely observable control problems with finite horizons. Using a time discretization we construct a nonlinear semigroup related to the dynamic programming principle (DPP), whose generator provides the Hamilton–Jacobi–Bellman (HJB) equation, and we characterize the value function via the nonlinear semigroup, besides the viscosity solution theory. When we control not only the dynamics of a system but also the terminal time of its evolution, control-stopping problems arise. This problem is treated in the same frameworks, via the nonlinear semigroup. Its results are applicable to the American option price problem. Zero-sum two-player time-homogeneous stochastic differential games and viscosity solutions of the Isaacs equations arising from such games are studied via a nonlinear semigroup related to DPP (the min-ma...

  9. Constructive Conflict: How Controversy Can Contribute to School Improvement.

    Science.gov (United States)

    Uline, Cynthia L.; Tshannen-Moran, Megan; Perez, Lynne

    2003-01-01

    Examines constructive conflict within the context of a comprehensive Midwestern U.S. high school engaged in significant reform efforts, focusing on constructive conflict as a means to promote individual and organizational learning and growth. Data from observations and interviews indicated that to produce superior results, principals and teacher…

  10. Compiler Construction Using Java, JavaCC, and Yacc

    CERN Document Server

    Dos Reis, Anthony J

    2012-01-01

    Broad in scope, involving theory, the application of that theory, and programming technology, compiler construction is a moving target, with constant advances in compiler technology taking place. Today, a renewed focus on do-it-yourself programming makes a quality textbook on compilers, that both students and instructors will enjoy using, of even more vital importance. This book covers every topic essential to learning compilers from the ground up and is accompanied by a powerful and flexible software package for evaluating projects, as well as several tutorials, well-defined projects, and tes

  11. Field observations and lessons learned

    Energy Technology Data Exchange (ETDEWEB)

    Nielsen, Joh B [Los Alamos National Laboratory

    2010-01-01

    This presentation outlines observations and lessons learned from the Megaports program. It provides: (1) details of field and technical observations collected during LANL field activities at ports around the world and details of observations collected during radiation detections system testing at Los Alamos National Laboratory; (2) provides suggestions for improvement and efficiency; and (3) discusses possible program execution changes for more effective operations.

  12. Local Observations, Global Connections: An Educational Program Using Ocean Networks Canada's Community-Based Observatories

    Science.gov (United States)

    Pelz, M.; Hoeberechts, M.; Ewing, N.; Davidson, E.; Riddell, D. J.

    2014-12-01

    Schools on Canada's west coast and in the Canadian Arctic are participating in the pilot year of a novel educational program based on analyzing, understanding and sharing ocean data collected by cabled observatories. The core of the program is "local observations, global connections." First, students develop an understanding of ocean conditions at their doorstep through the analysis of community-based observatory data. Then, they connect that knowledge with the health of the global ocean by engaging with students at other schools participating in the educational program and through supplemental educational resources. Ocean Networks Canada (ONC), an initiative of the University of Victoria, operates cabled ocean observatories which supply continuous power and Internet connectivity to a broad suite of subsea instruments from the coast to the deep sea. This Internet connectivity permits researchers, students and members of the public to download freely available data on their computers anywhere around the globe, in near real-time. In addition to the large NEPTUNE and VENUS cabled observatories off the coast of Vancouver Island, British Columbia, ONC has been installing smaller, community-based cabled observatories. Currently two are installed: one in Cambridge Bay, Nunavut and one at Brentwood College School, on Mill Bay in Saanich Inlet, BC. Several more community-based observatories are scheduled for installation within the next year. The observatories support a variety of subsea instruments, such as a video camera, hydrophone and water quality monitor and shore-based equipment including a weather station and a video camera. Schools in communities hosting an observatory are invited to participate in the program, alongside schools located in other coastal and inland communities. Students and teachers access educational material and data through a web portal, and use video conferencing and social media tools to communicate their findings. A series of lesson plans

  13. Computer aided system engineering for space construction

    Science.gov (United States)

    Racheli, Ugo

    1989-01-01

    This viewgraph presentation covers the following topics. Construction activities envisioned for the assembly of large platforms in space (as well as interplanetary spacecraft and bases on extraterrestrial surfaces) require computational tools that exceed the capability of conventional construction management programs. The Center for Space Construction is investigating the requirements for new computational tools and, at the same time, suggesting the expansion of graduate and undergraduate curricula to include proficiency in Computer Aided Engineering (CAE) though design courses and individual or team projects in advanced space systems design. In the center's research, special emphasis is placed on problems of constructability and of the interruptability of planned activity sequences to be carried out by crews operating under hostile environmental conditions. The departure point for the planned work is the acquisition of the MCAE I-DEAS software, developed by the Structural Dynamics Research Corporation (SDRC), and its expansion to the level of capability denoted by the acronym IDEAS**2 currently used for configuration maintenance on Space Station Freedom. In addition to improving proficiency in the use of I-DEAS and IDEAS**2, it is contemplated that new software modules will be developed to expand the architecture of IDEAS**2. Such modules will deal with those analyses that require the integration of a space platform's configuration with a breakdown of planned construction activities and with a failure modes analysis to support computer aided system engineering (CASE) applied to space construction.

  14. Alternate performance standard project: Interpreting the post-construction test

    International Nuclear Information System (INIS)

    Williamson, A.D.; McDonough, S.E.

    1993-01-01

    The paper describes the results of a project commissioned by the State of Florida, in cooperation with the US Environmental Protection Agency, as one portion of the Florida Radon Research Program (FRRP). The purpose of the FRRP is to provide technical support for a statewide Building Standard for Radon-Resistant Construction currently in the rulemaking process. In this case the information provides technical background for a post-construction radon test specified as a performance element of the code which accompanies the prescriptive alternative that does not incorporate active radon reduction systems

  15. Observational studies in systematic [corrected] reviews of comparative effectiveness: AHRQ and the Effective Health Care Program.

    Science.gov (United States)

    Norris, Susan L; Atkins, David; Bruening, Wendy; Fox, Steven; Johnson, Eric; Kane, Robert; Morton, Sally C; Oremus, Mark; Ospina, Maria; Randhawa, Gurvaneet; Schoelles, Karen; Shekelle, Paul; Viswanathan, Meera

    2011-11-01

    Systematic reviewers disagree about the ability of observational studies to answer questions about the benefits or intended effects of pharmacotherapeutic, device, or procedural interventions. This study provides a framework for decision making on the inclusion of observational studies to assess benefits and intended effects in comparative effectiveness reviews (CERs). The conceptual model and recommendations were developed using a consensus process by members of the methods workgroup of the Effective Health Care Program of the Agency for Healthcare Research and Quality. In considering whether to use observational studies in CERs for addressing beneficial effects, reviewers should answer two questions: (1) Are there gaps in the evidence from randomized controlled trials (RCTs)? (2) Will observational studies provide valid and useful information? The latter question involves the following: (a) refocusing the study questions on gaps in the evidence from RCTs, (b) assessing the risk of bias of the body of evidence of observational studies, and (c) assessing whether available observational studies address the gap review questions. Because it is unusual to find sufficient evidence from RCTs to answer all key questions concerning benefit or the balance of benefits and harms, comparative effectiveness reviewers should routinely assess the appropriateness of inclusion of observational studies for questions of benefit. Furthermore, reviewers should explicitly state the rationale for inclusion or exclusion of observational studies when conducting CERs. Copyright © 2011 Elsevier Inc. All rights reserved.

  16. Design and construction of an impulse turbine

    Science.gov (United States)

    Hernández, E.

    2013-11-01

    Impulse turbine has been constructed to be used in the program of Hydraulic Machines, Faculty of Mechanical Engineering at the Universidad Pontificia Bolivariana, sede Bucaramanga. For construction of the impulse turbine (Pelton) detailed plans were drawn up taking into account the design and implementation of the fundamental equations of hydraulic turbomachinery. From the experimental data found maximum mechanical efficiency of 0.6 ± 0.03 for a water flow of 2.1 l/s. The maximum overall efficiency was 0.23 ± 0.02 for a water flow of 0.83 l/s. The design parameter used was a power of 1 kW, as flow regulator built a needle type regulator, which performed well, the model of the bucket or vane is built on a machine type CNC (Computer Numerical Control). For the construction of the impeller and blades was used aluminium because of chemical and physical characteristics and the casing was manufactured in acrylic.

  17. Design and construction of an impulse turbine

    International Nuclear Information System (INIS)

    Hernández, E

    2013-01-01

    Impulse turbine has been constructed to be used in the program of Hydraulic Machines, Faculty of Mechanical Engineering at the Universidad Pontificia Bolivariana, sede Bucaramanga. For construction of the impulse turbine (Pelton) detailed plans were drawn up taking into account the design and implementation of the fundamental equations of hydraulic turbomachinery. From the experimental data found maximum mechanical efficiency of 0.6 ± 0.03 for a water flow of 2.1 l/s. The maximum overall efficiency was 0.23 ± 0.02 for a water flow of 0.83 l/s. The design parameter used was a power of 1 kW, as flow regulator built a needle type regulator, which performed well, the model of the bucket or vane is built on a machine type CNC (Computer Numerical Control). For the construction of the impeller and blades was used aluminium because of chemical and physical characteristics and the casing was manufactured in acrylic

  18. The French underground research laboratory program, contribution to the feasibility and safety studies of geological disposal

    International Nuclear Information System (INIS)

    Hoorelbeke, J.M.; Niezborala, J.M.; Ben Slimane, K.

    2001-01-01

    The paper presents the content of the research program to be performed during the construction and the operation of the National Agency for Radioactive Waste Management's (ANDRA) underground laboratory, located in the east of France. The general architecture of the program is presented. Emphasis is put on an iterative process, the purpose of which is mainly to: Prepare site behavior models before starting each phase of the field work (bore hole drilling, shaft sinking, construction of underground galleries, specific experiments); Test and check each model through actual observations and measurements; Adjust the models to take into account the results of the former phase and predict the results expected during the following one. All these models, after validation, will be exploited during the assessment of the safety related performance of the components of the potential repository as well as the whole facility; Obtain necessary data related to the feasibility study of the disposal facility (mechanical design, thermal design, etc.,) and its safety assessment. The relationship between the experimental program, the conceptual design program and the safety evaluation program is explained in order to reach the project objectives which is the final document set to be provided to French authorities in 2006 according to the French law of December 1991. (author)

  19. On the size of monotone span programs

    NARCIS (Netherlands)

    Nikov, V.S.; Nikova, S.I.; Preneel, B.; Blundo, C.; Cimato, S.

    2005-01-01

    Span programs provide a linear algebraic model of computation. Monotone span programs (MSP) correspond to linear secret sharing schemes. This paper studies the properties of monotone span programs related to their size. Using the results of van Dijk (connecting codes and MSPs) and a construction for

  20. Licensing of ANSTO'S OPAL reactor during construction and commissioning

    International Nuclear Information System (INIS)

    Summerfield, M.W.; Ordonez, J.P.

    2006-01-01

    Full text: This paper presents a general description of the ongoing licensing activities associated with the construction and commissioning of the Australian Nuclear Science and Technology Organisation's (ANSTO) Open Pool Australian Light-water (OPAL) Reactor at their Lucas Heights site. It addresses the following aspects: The Construction Licence - what it is and what impact it had on the construction of the OPAL Reactor, specifically the various Construction Licence Conditions; The interface between ANSTO, INVAP and ARPANSA during the construction of the OPAL Reactor, particularly in relation to ARPANS Regulation 54; Specific licensing issues that have arisen during the construction and commissioning process and how they have been resolved; The Operating Licence Application - what it is and how it interfaces with the construction and commissioning of the OPAL Reactor. These aspects are all addressed from the point of view of the licensee ANSTO and the RRR Project. Particular emphasis will be given to the way in which the licensing process is integrated into the overall project program and the lessons learnt that may be of benefit to other licensees and regulators. Note that this paper is an update of a presentation given at IGORR10 and follows on from a paper previously presented at PNBC12 in October 2002

  1. Construction of a High Temporal-spectral Resolution Spectrometer for Detection of Fast Transients from Observations of the Sun at 1.4 GHz.

    Science.gov (United States)

    Casillas-Perez, G. A.; Jeyakumar, S.; Perez-Enriquez, R.

    2014-12-01

    Transients explosive events with time durations from nanoseconds to several hours, are observed in the Sun at high energy bands such as gamma ray and xray. In the radio band, several types of radio bursts are commonly detected from the ground. A few observations of the Sun in the past have also detected a new class of fast transients which are known to have short-live electromagnetic emissions with durations less than 100 ms. The mechanisms that produce such fast transiets remain unclear. Observations of such fast transients over a wide bandwidth is necessary to uderstand the underlying physical process that produce such fast transients. Due to their very large flux densities, fast radio transients can be observed at high time resolution using small antennas in combination with digital signal processing techniques. In this work we report the progress of an spectrometer that is currently in construction at the Observatorio de la Luz of the Universidad de Guanajuato. The instrument which will have the purpose of detecting solar fast radio transients, involves the use of digital devices such as FPGA and ADC cards, in addition with a receiver with high temporal-spectral resolution centered at 1.4 GHz and a pair of 2.3 m satellite dish.

  2. Nuclear power plants. Construction status report, data as of September 30, 1977

    International Nuclear Information System (INIS)

    1977-10-01

    The report provides information for monitoring the progress of construction of nuclear power plants. It provides data for synchronizing the licensing process with predicted fuel loading dates, as well as providing a central federal government report for commercial reactor construction. It utilizes data collected from the utilities sponsoring these projects and the Office of Inspection and Enforcement, NRC, and analyzed by the Office of Management Information and Program Control in the implementation of Management Information Systems. T he status of 93 plants authorized to engage in construction activities is summarized. This total includes (4) plants with construction exemptions, and (11) plants with Limited Work Authorization Permits

  3. Design of methodology for incremental compiler construction

    Directory of Open Access Journals (Sweden)

    Pavel Haluza

    2011-01-01

    Full Text Available The paper deals with possibilities of the incremental compiler construction. It represents the compiler construction possibilities for languages with a fixed set of lexical units and for languages with a variable set of lexical units, too. The methodology design for the incremental compiler construction is based on the known algorithms for standard compiler construction and derived for both groups of languages. Under the group of languages with a fixed set of lexical units there belong languages, where each lexical unit has its constant meaning, e.g., common programming languages. For this group of languages the paper tries to solve the problem of the incremental semantic analysis, which is based on incremental parsing. In the group of languages with a variable set of lexical units (e.g., professional typographic system TEX, it is possible to change arbitrarily the meaning of each character on the input file at any time during processing. The change takes effect immediately and its validity can be somehow limited or is given by the end of the input. For this group of languages this paper tries to solve the problem case when we use macros temporarily changing the category of arbitrary characters.

  4. Measuring coalition functioning: refining constructs through factor analysis.

    Science.gov (United States)

    Brown, Louis D; Feinberg, Mark E; Greenberg, Mark T

    2012-08-01

    Internal and external coalition functioning is an important predictor of coalition success that has been linked to perceived coalition effectiveness, coalition goal achievement, coalition ability to support evidence-based programs, and coalition sustainability. Understanding which aspects of coalition functioning best predict coalition success requires the development of valid measures of empirically unique coalition functioning constructs. The goal of the present study is to examine and refine the psychometric properties of coalition functioning constructs in the following six domains: leadership, interpersonal relationships, task focus, participation benefits/costs, sustainability planning, and community support. The authors used factor analysis to identify problematic items in our original measure and then piloted new items and scales to create a more robust, psychometrically sound, multidimensional measure of coalition functioning. Scales displayed good construct validity through correlations with other measures. Discussion considers the strengths and weaknesses of the refined instrument.

  5. A Services-Oriented Architecture for Water Observations Data

    Science.gov (United States)

    Maidment, D. R.; Zaslavsky, I.; Valentine, D.; Tarboton, D. G.; Whitenack, T.; Whiteaker, T.; Hooper, R.; Kirschtel, D.

    2009-04-01

    Water observations data are time series of measurements made at point locations of water level, flow, and quality and corresponding data for climatic observations at point locations such as gaged precipitation and weather variables. A services-oriented architecture has been built for such information for the United States that has three components: hydrologic information servers, hydrologic information clients, and a centralized metadata cataloging system. These are connected using web services for observations data and metadata defined by an XML-based language called WaterML. A Hydrologic Information Server can be built by storing observations data in a relational database schema in the CUAHSI Observations Data Model, in which case, web services access to the data and metadata is automatically provided by query functions for WaterML that are wrapped around the relational database within a web server. A Hydrologic Information Server can also be constructed by custom-programming an interface to an existing water agency web site so that responds to the same queries by producing data in WaterML as do the CUAHSI Observations Data Model based servers. A Hydrologic Information Client is one which can interpret and ingest WaterML metadata and data. We have two client applications for Excel and ArcGIS and have shown how WaterML web services can be ingested into programming environments such as Matlab and Visual Basic. HIS Central, maintained at the San Diego Supercomputer Center is a repository of observational metadata for WaterML web services which presently indexes 342 million data measured at 1.75 million locations. This is the largest catalog water observational data for the United States presently in existence. As more observation networks join what we term "CUAHSI Water Data Federation", and the system accommodates a growing number of sites, measured parameters, applications, and users, rapid and reliable access to large heterogeneous hydrologic data repositories

  6. Stability and lifetime testing of photomultiplier detectors for the Earth observing system SOLSTICE program

    Science.gov (United States)

    Hadler, Joshua A.; van de Kop, Toni; Drake, Virginia A.; McClintock, William E.; Murphy, John; Rodgers, Paul

    1998-10-01

    The primary objective of the Earth Observing System (EOS) Solar Stellar Irradiance Comparison Experiment (SOLSTICE) is to accurately measure the absolute value of the solar UV irradiance at the top of the earth's atmosphere for a minimum mission lifetime of 5 years. To meet this objective, SOLSTICE employs a unique design to determine changes in instrument performance by routinely observing a series of early-type stars and comparing the irradiances directly with the solar value. Although the comparison techniques allows us to track instrument performance, the success of the SOLSTICE experiment depends upon photomultiplier detectors which have graceful degradation properties. Therefore, we have established a laboratory program to evaluate the characteristics of photomultiplier tubes which are exposed to long term fluxes similar to those we expected to encounter in flight. Three types of Hamamatsu photomultiplier tubes were tested as candidates for use in the EOS-SOLSTICE project. The results of these studies: pulse height distribution; quantum efficiency; surface maps,; and lifetime analysis are presented in this paper.

  7. Automatic Construction of Finite Algebras

    Institute of Scientific and Technical Information of China (English)

    张健

    1995-01-01

    This paper deals with model generation for equational theories,i.e.,automatically generating (finite)models of a given set of (logical) equations.Our method of finite model generation and a tool for automatic construction of finite algebras is described.Some examples are given to show the applications of our program.We argue that,the combination of model generators and theorem provers enables us to get a better understanding of logical theories.A brief comparison betwween our tool and other similar tools is also presented.

  8. Verification of business rules programs

    CERN Document Server

    Silva, Bruno Berstel-Da

    2013-01-01

    Rules represent a simplified means of programming, congruent with our understanding of human brain constructs. With the advent of business rules management systems, it has been possible to introduce rule-based programming to nonprogrammers, allowing them to map expert intent into code in applications such as fraud detection, financial transactions, healthcare, retail, and marketing. However, a remaining concern is the quality, safety, and reliability of the resulting programs.  This book is on business rules programs, that is, rule programs as handled in business rules management systems. Its

  9. Construction safety program for the National Ignition Facility, Appendix A

    International Nuclear Information System (INIS)

    Cerruti, S.J.

    1997-01-01

    Topics covered in this appendix include: General Rules-Code of Safe Practices; 2. Personal Protective Equipment; Hazardous Material Control; Traffic Control; Fire Prevention; Sanitation and First Aid; Confined Space Safety Requirements; Ladders and Stairways; Scaffolding and Lift Safety; Machinery, Vehicles, and Heavy Equipment; Welding and Cutting-General; Arc Welding; Oxygen/Acetylene Welding and Cutting; Excavation, Trenching, and Shoring; Fall Protection; Steel Erection; Working With Asbestos; Radiation Safety; Hand Tools; Electrical Safety; Nonelectrical Work Performed Near Exposed High-Voltage Power-Distribution Equipment; Lockout/Tagout Requirements; Rigging; A-Cranes; Housekeeping; Material Handling and Storage; Lead; Concrete and Masonry Construction

  10. Construction safety program for the National Ignition Facility, Appendix A

    Energy Technology Data Exchange (ETDEWEB)

    Cerruti, S.J.

    1997-06-26

    Topics covered in this appendix include: General Rules-Code of Safe Practices; 2. Personal Protective Equipment; Hazardous Material Control; Traffic Control; Fire Prevention; Sanitation and First Aid; Confined Space Safety Requirements; Ladders and Stairways; Scaffolding and Lift Safety; Machinery, Vehicles, and Heavy Equipment; Welding and Cutting-General; Arc Welding; Oxygen/Acetylene Welding and Cutting; Excavation, Trenching, and Shoring; Fall Protection; Steel Erection; Working With Asbestos; Radiation Safety; Hand Tools; Electrical Safety; Nonelectrical Work Performed Near Exposed High-Voltage Power-Distribution Equipment; Lockout/Tagout Requirements; Rigging; A-Cranes; Housekeeping; Material Handling and Storage; Lead; Concrete and Masonry Construction.

  11. Ontario Hydro's nuclear program

    International Nuclear Information System (INIS)

    Jackson, H.A.

    1982-06-01

    In 1981 Ontario Hydro generated over 100 billion KWh of electrical energy. Approximately one third of this was from nuclear units. There are ten CANDU units (5 250 MW) currently in operation, and another twelve (8 600 MW) are under construction. The presently committed nuclear expansion program is estimated to involve expenditures of 16 billion dollars over the next 10 years. About 10 000 people are employed in the nuclear design and construction program. All projects are generally on schedule, with the stations coming into service during the following time periods: Pickering B, 1983-85; Bruce B, 1984-87; Darlington, 1988-90. The status of each project is reviewed. Planning is underway for some retubing projects, as early as 1985 for Pickering A

  12. 7 CFR 3560.52 - Program objectives.

    Science.gov (United States)

    2010-01-01

    ... objectives. The Agency uses appropriated funds to finance the construction, rehabilitation of program... 7 Agriculture 15 2010-01-01 2010-01-01 false Program objectives. 3560.52 Section 3560.52 Agriculture Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, DEPARTMENT OF...

  13. Approach to improve construction management utilizing information technology

    International Nuclear Information System (INIS)

    Lee, Woo Bang; Moon, Jin Yeong

    2003-01-01

    Korea Hydro and Nuclear Power (KHNP) has been managed Nuclear Power Plant (NPP) construction projects including basic project planning, design, procurement, construction and start-up for nearly 30 years, and taken the leading role in the self-reliance program for constructing NPP. To maintain its leading position of construction technology and export it to other countries, it is more likely required to build the strong and competitive business management system to improve internal business efficiency and transparency, and also to respond to the change of external business circumstances such as electricity market opening. KHNP is implementing Enterprise Resource Planning (ERP) System as a business innovation tool to improve business efficiency, which changes the way of performing work from organizational system to process-oriented system in order to optimize the company resources to achieve above goals. This change should be made based on the results of performing Business Process Re-engineering (BPR) to maximize overall business efficiency. For the construction project management area, the establishment of Integrated Construction Information Sharing System based on Information Technology (IT) is the most important part. It makes possible to build collaboration system with 'Win-Win strategy' between the project owner and all related entities and to contribute to secure transparency and cut the project cost down. We would like to introduce our NPP Construction Project Management System, Infrastructure for Information System, Information Sharing System among construction related entities and Implementation Practices in this paper and also include the suggestions on our customary practice and subject that should be improved

  14. Observations concerning Research Literature on Neuro-Linguistic Programming.

    Science.gov (United States)

    Einspruch, Eric L.; Forman, Bruce D.

    1985-01-01

    Identifies six categories of design and methodological errors contained in the 39 empirical studies of neurolinguistic programming (NLP) documented through April 1984. Representative reports reflecting each category are discussed. Suggestions are offered for improving the quality of research on NLP. (Author/MCF)

  15. The FORCE: A highly portable parallel programming language

    Science.gov (United States)

    Jordan, Harry F.; Benten, Muhammad S.; Alaghband, Gita; Jakob, Ruediger

    1989-01-01

    Here, it is explained why the FORCE parallel programming language is easily portable among six different shared-memory microprocessors, and how a two-level macro preprocessor makes it possible to hide low level machine dependencies and to build machine-independent high level constructs on top of them. These FORCE constructs make it possible to write portable parallel programs largely independent of the number of processes and the specific shared memory multiprocessor executing them.

  16. The FORCE - A highly portable parallel programming language

    Science.gov (United States)

    Jordan, Harry F.; Benten, Muhammad S.; Alaghband, Gita; Jakob, Ruediger

    1989-01-01

    This paper explains why the FORCE parallel programming language is easily portable among six different shared-memory multiprocessors, and how a two-level macro preprocessor makes it possible to hide low-level machine dependencies and to build machine-independent high-level constructs on top of them. These FORCE constructs make it possible to write portable parallel programs largely independent of the number of processes and the specific shared-memory multiprocessor executing them.

  17. PSF support pilot program

    Science.gov (United States)

    Anderson, Jay

    2013-10-01

    The goal of this program is to observe the center of Omega Cen {which has a nice flat distribution of reasonably-spaced-out stars} in order to construct a PSF model for ACS's three workhorse filters: F435W, F606W, and F814W. These also happen to be the three ACS filters that will be used in the Frontier-Field program. PI-Anderson will use the data to consturct an 9x10 array of fiducial PSFs that describe the static variation of the PSF across the frame for each filter. He will also provide some simple routines that the public can use to insert PSFs into images.The observations will dither the center of the cluster around in a circle with a radius of about 30" such that any single star never falls in the ACS gap more than once. This has the additional benefit that we can use this large dither to validate or improve the distortion solution at the same time we are solving for the PSF. We will get four exposures through each of the ACS filters. The exposure times for the three ACS filters {F435W, F606W, and F814W} were chosen to maximize the number of bright unsaturated stars while simultaneously minimizing the number of saturated stars present. To do this, we made sure that the SGB {which is where the LF rises precipitously} is just below the saturation level. We used archival images from GO-9444 and GO-10775 to ensure that 339s for F435W, 80s in F606W, and 90s in F814W is perfect for this.In addition to the ACS exposures, we also take parallels with WFC3/IR. These exposures will sample a field that is 6' off center. The core radius is 2.5', so this outer field should have a density that is 5x lower than at the center, meaning the typical star is maybe 2.5x farther away. This should compensate for the larger WFC3/IR pixels and will allow us to construct PSFs that are appropriate. We take a total of 32 WFC3/IR exposures, each with an exposure time of 103s, and divide these 32 exposures among the four FF WFC3/IR exposures: F105W, F125W, F140W, and F160W. We will use

  18. A project management quality cost information system for the construction industry

    OpenAIRE

    Love, PED; Irani, Z

    2003-01-01

    A prototype Project Management Quality Cost System (PROMQACS) was developed to determine quality costs in construction projects. The structure and information requirements that are needed to provide a classification system of quality costs were identified and discussed. The developed system was tested and implemented in two case study construction projects to determine the information and management issues needed to develop PROMQACS into a software program. In addition, the system was used to...

  19. 7 CFR 1942.126 - Planning, bidding, contracting, constructing, procuring.

    Science.gov (United States)

    2010-01-01

    ...) RURAL HOUSING SERVICE, RURAL BUSINESS-COOPERATIVE SERVICE, RURAL UTILITIES SERVICE, AND FARM SERVICE.../build type contract, section 4, “Conflict of Interest,” may need revision. (l) Construction contract... materially affect the ability to attain program objectives or prevent the meeting of project work units by...

  20. A model of scientific attitudes assessment by observation in physics learning based scientific approach: case study of dynamic fluid topic in high school

    Science.gov (United States)

    Yusliana Ekawati, Elvin

    2017-01-01

    This study aimed to produce a model of scientific attitude assessment in terms of the observations for physics learning based scientific approach (case study of dynamic fluid topic in high school). Development of instruments in this study adaptation of the Plomp model, the procedure includes the initial investigation, design, construction, testing, evaluation and revision. The test is done in Surakarta, so that the data obtained are analyzed using Aiken formula to determine the validity of the content of the instrument, Cronbach’s alpha to determine the reliability of the instrument, and construct validity using confirmatory factor analysis with LISREL 8.50 program. The results of this research were conceptual models, instruments and guidelines on scientific attitudes assessment by observation. The construct assessment instruments include components of curiosity, objectivity, suspended judgment, open-mindedness, honesty and perseverance. The construct validity of instruments has been qualified (rated load factor > 0.3). The reliability of the model is quite good with the Alpha value 0.899 (> 0.7). The test showed that the model fits the theoretical models are supported by empirical data, namely p-value 0.315 (≥ 0.05), RMSEA 0.027 (≤ 0.08)

  1. Implementation of building information modeling in Malaysian construction industry

    Science.gov (United States)

    Memon, Aftab Hameed; Rahman, Ismail Abdul; Harman, Nur Melly Edora

    2014-10-01

    This study has assessed the implementation level of Building Information Modeling (BIM) in the construction industry of Malaysia. It also investigated several computer software packages facilitating BIM and challenges affecting its implementation. Data collection for this study was carried out using questionnaire survey among the construction practitioners. 95 completed forms of questionnaire received against 150 distributed questionnaire sets from consultant, contractor and client organizations were analyzed statistically. Analysis findings indicated that the level of implementation of BIM in the construction industry of Malaysia is very low. Average index method employed to assess the effectiveness of various software packages of BIM highlighted that Bentley construction, AutoCAD and ArchiCAD are three most popular and effective software packages. Major challenges to BIM implementation are it requires enhanced collaboration, add work to a designer, interoperability and needs enhanced collaboration. For improving the level of implementing BIM in Malaysian industry, it is recommended that a flexible training program of BIM for all practitioners must be created.

  2. Further Insight into the Effectiveness of a Behavioral Teacher Program Targeting ADHD Symptoms Using Actigraphy, Classroom Observations and Peer Ratings.

    Science.gov (United States)

    Veenman, Betty; Luman, Marjolein; Oosterlaan, Jaap

    2017-01-01

    Objective: The Positivity and Rules program (PR program), a low-level behavioral teacher program targeting symptoms of attention-deficit/hyperactivity disorder (ADHD), has shown positive effects on teacher-rated ADHD symptoms and social functioning. This study aimed to assess whether program effects could be confirmed by instruments assessing classroom behavior other than teacher-ratings, given teachers' involvement with the training. Methods: Participants were 114 primary school children (age = 6-13) displaying ADHD symptoms in the classroom, who were randomly assigned to the treatment ( n = 58) or control group ( n = 65). ADHD symptoms were measured using classroom observations and actigraphy, and peer acceptance was measured using peer ratings. Intention-to-treat multilevel analyses were conducted to assess program effects. Results: No beneficial program effects were found for any of the measures. Conclusion: The earlier beneficial program effects on both ADHD symptoms and social functioning reported by teachers, may be explained by a change in the perception of teachers rather than changes in the child's behavior. Other methodological explanations are also discussed, such as differences between instruments in the sensitivity to program-related changes. The current study underlines the importance of using different measures of classroom behavior to study program effects. ClinicalTrials.gov registration number: NCT02518711.

  3. Wind Atlas for South Africa (WASA) Observational wind atlas for 10 met. stations in Northern, Western and Eastern Cape provinces

    DEFF Research Database (Denmark)

    Mortensen, Niels Gylling; Hansen, Jens Carsten; Kelly, Mark C.

    As part of the “Wind Atlas for South Africa” project, microscale modelling has been carried out for 10 meteorological stations in Northern, Western and Eastern Cape provinces. Wind speed and direction data from the ten 60-m masts have been analysed using the Wind Atlas Analysis and Application...... Program (WAsP 11). The windclimatological inputs are the observed wind climates derived from the WAsP Climate Analyst. Topographical inputs are elevation maps constructed from SRTM 3 data and rough-ness length maps constructed from SWBD data and Google Earth satellite imagery. Summaries are given...... of the data measured at the 10 masts, mainly for a 3-year reference period from October 2010 to September 2013. The main result of the microscale modelling is observational wind atlas data sets, which can be used for verification of the mesoscale modelling. In addition, the microscale modelling itself has...

  4. Wind Atlas for South Africa (WASA) Observational wind atlas for 10 met. stations in Northern, Western and Eastern Cape provinces

    DEFF Research Database (Denmark)

    Mortensen, Niels Gylling; Hansen, Jens Carsten; Kelly, Mark C.

    As part of the “Wind Atlas for South Africa” project, microscale modelling has been carried out for 10 meteorological stations in Northern, Western and Eastern Cape provinces. Wind speed and direction data from the ten 60-m masts have been analysed using the Wind Atlas Analysis and Application...... Program (WAsP 11). The wind-climatological inputs are the observed wind climates derived from the WAsP Climate Analyst. Topographical inputs are elevation maps constructed from SRTM 3 data and roughness length maps constructed from SWBD data and Google Earth satellite imagery. Summaries are given...... of the data measured at the 10 masts, mainly for a 3-year reference period from October 2010 to September 2013. The main result of the microscale modelling is observational wind atlas data sets, which can be used for verification of the mesoscale modelling. In addition, the microscale modelling itself has...

  5. Identifying and analyzing the construction and effectiveness of offensive plays in basketball by using systematic observation.

    Science.gov (United States)

    Fernandez, Jordi; Camerino, Oleguer; Anguera, M Teresa; Jonsson, Gudberg K

    2009-08-01

    In the field of sports research, there is a growing need for the rigorous collection of data that provide empirical evidence about the complex reality they refer to. Although sports psychology research has advanced considerably in recent years, in both extent and quality, one area of research that remains relatively unexplored is the dynamics of the sports group and the influence of the group on its members (George & Feltz, 1995; Widmeyer, Brawley, & Carron, 1992). Key aspects in this regard include the presence of regularities that are not detectable through visual inference or traditional methods of data analysis, the lack of standard observation instruments, and, assuming priority, the need to develop powerful, computerized coding systems, all of which must form part of an approach that is suitable for natural and habitual contexts. The present study is part of a broader research project concerning ACB teams (first Spanish basketball division) and considers the interaction context before teams try to score (where this is understood as how teams create scoring opportunities) as the core aspect that links team play. This investigation proposes a new model of analysis for studying the effectiveness and construction of offensive basketball plays in order to identify their outcomes, thus providing coaches with an important device for improving or consolidating them.

  6. Effects of Self-esteem Improvement Program on Self-esteem and Peer Attachment in Elementary School Children with Observed Problematic Behaviors

    OpenAIRE

    Park, Kyung Min; Park, Heeok

    2015-01-01

    Purpose: The purpose of this study was to investigate the effects of a self-esteem improvement program on self-esteem and peer attachment in elementary school children with observed problematic behaviors. Methods: This study is a quasi-experimental study with a nonequivalent control group pretest-post-test design. A total of 47 fourth grade elementary school students participated in this study. The program was provided for 45 minutes once a week; a total of 12 sessions were completed with ...

  7. Construction management

    CERN Document Server

    Pellicer, Eugenio; Teixeira, José C; Moura, Helder P; Catalá, Joaquín

    2014-01-01

    The management of construction projects is a wide ranging and challenging discipline in an increasingly international industry, facing continual challenges and demands for improvements in safety, in quality and cost control, and in the avoidance of contractual disputes. Construction Management grew out of a Leonardo da Vinci project to develop a series of Common Learning Outcomes for European Managers in Construction. Financed by the European Union, the project aimed to develop a library of basic materials for developing construction management skills for use in a pan-European context. Focused exclusively on the management of the construction phase of a building project from the contractor's point of view, Construction Management covers the complete range of topics of which mastery is required by the construction management professional for the effective delivery of new construction projects. With the continued internationalisation of the construction industry, Construction Management will be required rea...

  8. Toward a constructive physics

    International Nuclear Information System (INIS)

    Noyes, H.P.; Gefwert, C.; Manthey, M.J.

    1983-06-01

    We argue that the discretization of physics which has occurred thanks to the advent of quantum mechanics has replaced the continuum standards of time, length and mass which brought physics to maturity by counting. The (arbitrary in the sense of conventional dimensional analysis) standards have been replaced by three dimensional constants: the limiting velocity c, the unit of action h, and either a reference mass (eg m/sub p/) or a coupling constant (eg G related to the mass scale by hc/(2πGm/sub p/ 2 ) approx. = 1.7 x 10 38 ). Once these physical and experimental reference standards are accepted, the conventional approach is to connect physics to mathematics by means of dimensionless ratios. But these standards now rest on counting rather than ratios, and allow us to think of a fourth dimensionless mathematical concept, which is counting integers. According to constructive mathematics, counting has to be understood before engaging in the practice of mathematics in order to avoid redundancy. In its strict form constructive mathematics allows no completed infinities, and must provide finite algorithms for the computation of any acceptable concept. This finite requirement in constructive mathematics is in keeping with the practice of physics when that practice is restricted to hypotheses which are testable in a finite time. In this paper we attempt to outline a program for physics which will meet these rigid criteria while preserving, in so far as possible, the successes that conventional physics has already achieved

  9. Toward a constructive physics

    Energy Technology Data Exchange (ETDEWEB)

    Noyes, H.P.; Gefwert, C.; Manthey, M.J.

    1983-06-01

    We argue that the discretization of physics which has occurred thanks to the advent of quantum mechanics has replaced the continuum standards of time, length and mass which brought physics to maturity by counting. The (arbitrary in the sense of conventional dimensional analysis) standards have been replaced by three dimensional constants: the limiting velocity c, the unit of action h, and either a reference mass (eg m/sub p/) or a coupling constant (eg G related to the mass scale by hc/(2..pi..Gm/sub p//sup 2/) approx. = 1.7 x 10/sup 38/). Once these physical and experimental reference standards are accepted, the conventional approach is to connect physics to mathematics by means of dimensionless ratios. But these standards now rest on counting rather than ratios, and allow us to think of a fourth dimensionless mathematical concept, which is counting integers. According to constructive mathematics, counting has to be understood before engaging in the practice of mathematics in order to avoid redundancy. In its strict form constructive mathematics allows no completed infinities, and must provide finite algorithms for the computation of any acceptable concept. This finite requirement in constructive mathematics is in keeping with the practice of physics when that practice is restricted to hypotheses which are testable in a finite time. In this paper we attempt to outline a program for physics which will meet these rigid criteria while preserving, in so far as possible, the successes that conventional physics has already achieved.

  10. Construction, testing, and initial operation of Fort St. Vrain PCRV

    International Nuclear Information System (INIS)

    Ople, F.S. Jr.; Neylan, A.J.

    1975-01-01

    The Fort St. Vrain (FSV) Nuclear Generating Station is the first station in the USA to use a prestressed concrete reactor vessel (PCRV). The PCRV was designed and constructed by General Atomic. Construction of the PCRV was completed in 1970; the pressure and leak tests were completed in 1971. The structural behavior of the PCRV has been monitored by installed instrumentation since start of construction. The highlights of the actual construction, testing, and initial operation of the PCRV, including a comparison of structural behavior, where possible, between observed data and analytical predictions. (U.S.)

  11. Lung cancer risk among construction workers in California, 1988-2007.

    Science.gov (United States)

    Calvert, Geoffrey M; Luckhaupt, Sara; Lee, Soo-Jeong; Cress, Rosemary; Schumacher, Pam; Shen, Rui; Tak, SangWoo; Deapen, Dennis

    2012-05-01

    Although lung cancer risks can vary by race/ethnicity and by construction occupation, these risks have not been examined extensively. This study analyzed 110,937 lung cancer cases identified from the California Cancer Registry between 1988 and 2007. Mean age at diagnosis, proportion diagnosed at an advanced stage, and proportion with 3-year survival were calculated for lung cancer cases employed in the construction industry. Case-control methodology was also used to assess the risk of lung cancer. Morbidity odds ratios (MORs) were estimated by conditional logistic regression. Construction workers were found to have a significantly elevated risk for all lung cancer combined (MOR = 1.57) and for each lung cancer histologic subtype examined. All construction occupations, except managers/engineers and supervisors, had a significantly elevated risk for all lung cancer combined. Roofers and welders had the highest risks for total lung cancer and for each of the histologic subtypes. Construction workers in each of the four race/ethnicity groups also had significantly increased lung cancer risks. Compared to non-construction workers, construction workers were diagnosed at an earlier age, at a more advanced stage, and had significantly lower 3-year survival, though differences were modest. These findings justify additional reductions in carcinogenic exposures in construction, and increased support for smoking cessation programs at construction sites. Copyright © 2012 Wiley Periodicals, Inc.

  12. Construction of the BNL EBIS preinjector

    Energy Technology Data Exchange (ETDEWEB)

    Alessi,J.; Barton, D.; Beebe, E.; Bellavia, S.; Gould, O.; Kponou, A.; Lambiase, R.; Lessard, E.; Lockey, R.; LoDestro, V.; Mapes, M.; McCafferty, D.; McNerney, A.; Okamura, M.; Pendzick, A.; Phillips, D.; Pikin, A. I.; Raparia, D.; Ritter, J.; Scaduto, J.; Snydstrup, L.; Wilinski, M.; Zaltsman, A. et al.

    2009-05-04

    A new heavy ion preinjector, consisting of an Electron Beam Ion Source (EBIS), an RFQ, and IH linac, is under construction at Brookhaven National Laboratory. This preinjector win provide ions of any species at an energy of 2 MeV/u, resulting in increased capabilities for the Relativistic Heavy Ion Collider, and the NASA Space Radiation Laboratory programs. The RF'Q has been commissioned with beam, and most of the remaining elements are either installed or being assembled.

  13. The Kepler follow-up observation program

    DEFF Research Database (Denmark)

    Gautier...[], T.N.; Batalha, N.M.; Borucki, W. J.

    2010-01-01

    The Kepler Mission was launched on March 6, 2009 to perform a photometric survey of more than 100,000 dwarf stars to search for terrestrial-size planets with the transit technique. Follow-up observations of planetary candidates identified by detection of transit-like events are needed both...

  14. Fifteen Fine Years of School Construction Progress, 1950-1965.

    Science.gov (United States)

    Milwaukee Public Schools, WI.

    A progress report reviews the Milwaukee School Board's continuous program of acquiring sites and building schools. An itemized listing of 140 completed construction projects is supplemented with pertinent facts and figures, including--(1) growth factors affecting school building needs, (2) resultant increases in the physical plant, staff and…

  15. Specifically Designed Constructed Wetlands: A Novel Treatment Approach for Scrubber Wastewater

    Energy Technology Data Exchange (ETDEWEB)

    John H. Rodgers Jr; James W. Castle; Chris Arrington: Derek Eggert; Meg Iannacone

    2005-09-01

    A pilot-scale wetland treatment system was specifically designed and constructed at Clemson University to evaluate removal of mercury, selenium, and other constituents from flue gas desulfurization (FGD) wastewater. Specific objectives of this research were: (1) to measure performance of a pilot-scale constructed wetland treatment system in terms of decreases in targeted constituents (Hg, Se and As) in the FGD wastewater from inflow to outflow; (2) to determine how the observed performance is achieved (both reactions and rates); and (3) to measure performance in terms of decreased bioavailability of these elements (i.e. toxicity of sediments in constructed wetlands and toxicity of outflow waters from the treatment system). Performance of the pilot-scale constructed wetland treatment systems was assessed using two criteria: anticipated NPDES permit levels and toxicity evaluations using two sentinel toxicity-testing organisms (Ceriodaphnia dubia and Pimephales promelas). These systems performed efficiently with varied inflow simulations of FGD wastewaters removing As, Hg, and Se concentrations below NPDES permit levels and reducing the toxicity of simulated FGD wastewater after treatment with the constructed wetland treatment systems. Sequential extraction procedures indicated that these elements (As, Hg, and Se) were bound to residual phases within sediments of these systems, which should limit their bioavailability to aquatic biota. Sediments collected from constructed wetland treatment systems were tested to observe toxicity to Hyalella azteca or Chironomus tetans. Complete survival (100%) was observed for H. azteca in all cells of the constructed wetland treatment system and C. tentans had an average of 91% survival over the three treatment cells containing sediments. Survival and growth of H. azteca and C. tentans did not differ significantly between sediments from the constructed wetland treatment system and controls. Since the sediments of the constructed

  16. Construction schedule management of China Experimental Fast Reactor

    International Nuclear Information System (INIS)

    Wang Yue

    2012-01-01

    China Experimental Fast Reactor (CEFR) in the first Fast Reactor in China, which is one of large project of the National High Technology Research and Development Program ('863' Program). On 21 st July 2011, CEFR had succeeded to connect to power grid, the target of construction had come true. To a large item, schedule management is one of the most important management, this paper a overall discussion about CEFR item. It has proved that the management of CEFR project is scientific, normative and high-efficiency, it will be valuable for lager Fast Reactor item and designers in interrelated field. (author)

  17. Field Testing of Compartmentalization Methods for Multifamily Construction

    Energy Technology Data Exchange (ETDEWEB)

    Ueno, K. [Building Science Corporation, Westford, MA (United States); Lstiburek, J. W. [Building Science Corporation, Westford, MA (United States)

    2015-03-01

    The 2012 International Energy Conservation Code (IECC) has an airtightness requirement of 3 air changes per hour at 50 Pascals test pressure (3 ACH50) for single-family and multifamily construction (in climate zones 3–8). The Leadership in Energy & Environmental Design certification program and ASHRAE Standard 189 have comparable compartmentalization requirements. ASHRAE Standard 62.2 will soon be responsible for all multifamily ventilation requirements (low rise and high rise); it has an exceptionally stringent compartmentalization requirement. These code and program requirements are driving the need for easier and more effective methods of compartmentalization in multifamily buildings.

  18. Construction of an optimal background profile for the Kuramoto–Sivashinsky equation using semidefinite programming

    International Nuclear Information System (INIS)

    Fantuzzi, G.; Wynn, A.

    2015-01-01

    A method to construct systematically an optimal background profile for the Kuramoto–Sivashinsky equation is developed by formulating the classical problem as an optimisation problem. In particular, we show that the infinite-dimensional problem can be rewritten as a finite-dimensional convex semidefinite problem, which is solved to construct a background profile and to obtain an upper bound on the energy of the solution ‖u‖ that applies to the infinite-dimensional PDE. The results are compared to existing analytical results, and support the fact that limsup t→∞ ‖u‖≤O(L 3/2 ) is the optimal estimate achievable with the background profile method and a quadratic Lyapunov function. - Highlights: • Optimal background profiles are constructed for the Kuramoto–Sivashinsky equation. • Analytical L 2 bounds for the solution are found using convex optimisation. • The optimal background profile is a double shock profile. • Results attest that L 1.5 scaling is optimal within the classic Lyapunov argument. • We improve the proportionality constant of the scaling law for the attracting set

  19. Construction status report: nuclear power plants, data for decisions. Status report

    International Nuclear Information System (INIS)

    1976-01-01

    The document is the 28th edition summarizing the results of a management information system established by the Executive Director for Operations on the construction/fuel load activities of nuclear power plants. The report uses data collected from applicants sponsoring these projects, Office of Inspection and Enforcement, and the Office of Standards Development; and analyzed by the Office of Management Information and Program Control in the implementation of Management Information Systems. The status of 87 plants authorized to engage in construction in Region I through V is summarized in this document. This total includes (4) plants with construction exemptions, and (14) plants with an LWA

  20. A probabilistic model for US nuclear power construction times

    International Nuclear Information System (INIS)

    Shash, A.A.H.

    1988-01-01

    Construction time for nuclear power plants is an important element in planning for resources to meet future load demands. Analysis of actual versus estimated construction times for past US nuclear power plants indicates that utilities have continuously underestimated their power plants' construction durations. The analysis also indicates that the actual average construction time has been increasing upward, and the actual durations of power plants permitted to construct in the same year varied substantially. This study presents two probabilistic models for nuclear power construction time for use by the nuclear industry as estimating tool. The study also presents a detailed explanation of the factors that are responsible for increasing and varying nuclear power construction times. Observations on 91 complete nuclear units were involved in three interdependent analyses in the process of explanation and derivation of the probabilistic models. The historical data was first utilized in the data envelopment analysis (DEA) for the purpose of obtaining frontier index measures for project management achievement in building nuclear power plants

  1. A Study of Construction Reactor Oversight Process in US

    International Nuclear Information System (INIS)

    Yun, I.; Kim, S. Y.; Jeong, G. Y.; Kim, S. P.

    2015-01-01

    This process provides a risk-informed approach such as construction significance determination process (SDP) and construction program performance index analogous to those used in the Reactor Oversight Process (ROP). The cROP has been applied to Vogtle units 3, 4 and V.C. Summer units 2, 3 under construction for the regulatory inspection. In this paper, the cROP is dissected to present its major contents and characteristics. The main features of the cROP can be summarized as followings: 1) The cROP which adopts the concept of the ROP used for operating NPPs assesses NPP under construction periodically to determine the appropriate level of regulatory response. 2) The cROP consists of three parts: the CIP, the CAP and the CEP. 3) The inspections for NPPs under construction can be categorized into three parts: vendor inspection, baseline inspection and supplemental and plant specific inspections. USNRC's regulatory resources can be used effectively based on baseline inspection, which is using ITAAC inspections. The construction SDP is used to assign the color scheme to categorize the significance of inspection findings. Regulatory actions are taken from CAM to which the significance of inspection findings input. In this paper, major contents and characteristics of USNRC's cROP have been presented

  2. User experience with HydroHelp programs

    Energy Technology Data Exchange (ETDEWEB)

    Verner, J.S. [Brookfield Power, Gatineau, PQ (Canada)

    2009-07-01

    Advances in the field of geographical information systems (GIS) have simplified the process of finding suitable sites for new hydroelectric projects. However, estimating the construction cost remains a challenge. The HydroHelp program is a cost evaluation program developed specifically to determine if a project will be economically feasible. The program is made up of 4 programs, depending on the type of turbine suitable for the site. Once a turbine selection is made, users can choose the program according to Kaplan, Impulse or Francis turbines. Users must rely on GIS, since the program requires a thorough understanding of the site geology and topography. Knowledge of hydroelectric plants is also necessary in order to obtain a credible construction cost. This paper demonstrated the capacity and flexibility of the software along with its different functions and available options. A detailed cost breakdown can be obtained along with an energy estimate and project specifications. In addition, the software can be used to optimize the project through different options by changing the facility's layout in terms of the type of dam, spillway, conduit length and diameter, turbine type and flood level. 17 figs.

  3. Supporting secure programming in web applications through interactive static analysis

    Science.gov (United States)

    Zhu, Jun; Xie, Jing; Lipford, Heather Richter; Chu, Bill

    2013-01-01

    Many security incidents are caused by software developers’ failure to adhere to secure programming practices. Static analysis tools have been used to detect software vulnerabilities. However, their wide usage by developers is limited by the special training required to write rules customized to application-specific logic. Our approach is interactive static analysis, to integrate static analysis into Integrated Development Environment (IDE) and provide in-situ secure programming support to help developers prevent vulnerabilities during code construction. No additional training is required nor are there any assumptions on ways programs are built. Our work is motivated in part by the observation that many vulnerabilities are introduced due to failure to practice secure programming by knowledgeable developers. We implemented a prototype interactive static analysis tool as a plug-in for Java in Eclipse. Our technical evaluation of our prototype detected multiple zero-day vulnerabilities in a large open source project. Our evaluations also suggest that false positives may be limited to a very small class of use cases. PMID:25685513

  4. Supporting secure programming in web applications through interactive static analysis

    Directory of Open Access Journals (Sweden)

    Jun Zhu

    2014-07-01

    Full Text Available Many security incidents are caused by software developers’ failure to adhere to secure programming practices. Static analysis tools have been used to detect software vulnerabilities. However, their wide usage by developers is limited by the special training required to write rules customized to application-specific logic. Our approach is interactive static analysis, to integrate static analysis into Integrated Development Environment (IDE and provide in-situ secure programming support to help developers prevent vulnerabilities during code construction. No additional training is required nor are there any assumptions on ways programs are built. Our work is motivated in part by the observation that many vulnerabilities are introduced due to failure to practice secure programming by knowledgeable developers. We implemented a prototype interactive static analysis tool as a plug-in for Java in Eclipse. Our technical evaluation of our prototype detected multiple zero-day vulnerabilities in a large open source project. Our evaluations also suggest that false positives may be limited to a very small class of use cases.

  5. Applying Gödel's Dialectica Interpretation to Obtain a Constructive Proof of Higman's Lemma

    Directory of Open Access Journals (Sweden)

    Thomas Powell

    2012-10-01

    Full Text Available We use Gödel's Dialectica interpretation to analyse Nash-Williams' elegant but non-constructive "minimal bad sequence" proof of Higman's Lemma. The result is a concise constructive proof of the lemma (for arbitrary decidable well-quasi-orders in which Nash-Williams' combinatorial idea is clearly present, along with an explicit program for finding an embedded pair in sequences of words.

  6. Quantum tomography, phase-space observables and generalized Markov kernels

    International Nuclear Information System (INIS)

    Pellonpaeae, Juha-Pekka

    2009-01-01

    We construct a generalized Markov kernel which transforms the observable associated with the homodyne tomography into a covariant phase-space observable with a regular kernel state. Illustrative examples are given in the cases of a 'Schroedinger cat' kernel state and the Cahill-Glauber s-parametrized distributions. Also we consider an example of a kernel state when the generalized Markov kernel cannot be constructed.

  7. Shortening the Miles to the Milestones: Connecting EPA-Based Evaluations to ACGME Milestone Reports for Internal Medicine Residency Programs.

    Science.gov (United States)

    Choe, John H; Knight, Christopher L; Stiling, Rebekah; Corning, Kelli; Lock, Keli; Steinberg, Kenneth P

    2016-07-01

    The Next Accreditation System requires internal medicine training programs to provide the Accreditation Council for Graduate Medical Education (ACGME) with semiannual information about each resident's progress in 22 subcompetency domains. Evaluation of resident "trustworthiness" in performing entrustable professional activities (EPAs) may offer a more tangible assessment construct than evaluations based on expectations of usual progression toward competence. However, translating results from EPA-based evaluations into ACGME milestone progress reports has proven to be challenging because the constructs that underlay these two systems differ.The authors describe a process to bridge the gap between rotation-specific EPA-based evaluations and ACGME milestone reporting. Developed at the University of Washington in 2012 and 2013, this method involves mapping EPA-based evaluation responses to "milestone elements," the narrative descriptions within the columns of each of the 22 internal medicine subcompetencies. As faculty members complete EPA-based evaluations, the mapped milestone elements are automatically marked as "confirmed." Programs can maintain a database that tallies the number of times each milestone element is confirmed for a resident; these data can be used to produce graphical displays of resident progress along the internal medicine milestones.Using this count of milestone elements allows programs to bridge the gap between faculty assessments of residents based on rotation-specific observed activities and semiannual ACGME reports based on the internal medicine milestones. Although potentially useful for all programs, this method is especially beneficial to large programs where clinical competency committee members may not have the opportunity for direct observation of all residents.

  8. What did you learn from practice today? Exploring experiences from a Danish R&D effort for digital construction

    DEFF Research Database (Denmark)

    Moum, Anita; Koch, Christian; Haugen, Tore

    2009-01-01

    models according to the ‘3D Working Method'. The paper concludes that the adaptation has been successful due to the initial ambitions of the project actors. Nevertheless, there are still many challenges to be overcome. The findings indicate that the introduction of the ‘3D Working Method' to the real-life......The Architecture-Engineering-Construction (AEC) industry has been slow in turning the potential of Information and Communication Technologies into greater efficiency and productivity. This is a phenomenon which can be observed in many countries, and in Denmark this issue has been recognized...... reports on the lessons learned from developing strategies, demands and guidelines in the ‘Digital Construction' program and from adapting one of its ‘digital foundations', the ‘3D Working Method', to the design process of the large-scale building project ‘The Icelandic National Concert and Conference...

  9. Construction history and construction management

    International Nuclear Information System (INIS)

    Agh, S.

    1999-01-01

    The process of pre-design and design preparation of the Mochovce NPP as well as the construction history of the plant is highlighted, including the financing aspect and problems arising from changes in the technological and other conditions of start-up of the reactor units. The results of international audits performed to improve the level of nuclear safety and implementation of the measures suggested are also described. The milestones of the whole construction process and start-up process, the control and quality system, and the methods of control and management of the complex construction project are outlined. (author)

  10. Informal worker phenomenon in housing construction project

    Science.gov (United States)

    Wijayaningtyas, Maranatha; Sipan, Ibrahim; Lukiyanto, Kukuh

    2017-11-01

    The informal workers phenomenon on housing construction projects in Indonesia is different from workers in other sectors who would always request as permanent employees. Substantively, the informal workers are disinclined to be bound as permanent employees which different from the general labor paradigm. Hence, the objective of this study is to find out how the labour selection process, the factors that affected their performance, and the suitable wage system to achieve the target completion of housing construction project. The qualitative method is used to uncover and understand the meaning behind the phenomena (numina) of informal workers action and their influence on housing construction project which called phenomenological approach. Five informal workers and two project managers were selected as informants based on predetermined criteria with in-depth interviews. The results showed that the informal worker were more satisfied with the wage based on unit price while working in the housing construction project for the flexibility in working hours. In addition, the developer was also relieved because they only control the quality and the achievement of the project completion time which supported by informal worker leader. Therefore, these findings are beneficial for both of developer and government as policy maker to succeed the housing program in Indonesia.

  11. Construction safety program for the National Ignition Facility, Appendix B

    Energy Technology Data Exchange (ETDEWEB)

    Cerruti, S.J.

    1997-06-26

    This Appendix contains material from the LLNL Health and Safety Manual as listed below. For sections not included in this list, please refer to the Manual itself. The areas covered are: asbestos, lead, fire prevention, lockout, and tag program confined space traffic safety.

  12. Construction safety program for the National Ignition Facility, Appendix B

    International Nuclear Information System (INIS)

    Cerruti, S.J.

    1997-01-01

    This Appendix contains material from the LLNL Health and Safety Manual as listed below. For sections not included in this list, please refer to the Manual itself. The areas covered are: asbestos, lead, fire prevention, lockout, and tag program confined space traffic safety

  13. Application of statistical distribution theory to launch-on-time for space construction logistic support

    Science.gov (United States)

    Morgenthaler, George W.

    1989-01-01

    The ability to launch-on-time and to send payloads into space has progressed dramatically since the days of the earliest missile and space programs. Causes for delay during launch, i.e., unplanned 'holds', are attributable to several sources: weather, range activities, vehicle conditions, human performance, etc. Recent developments in space program, particularly the need for highly reliable logistic support of space construction and the subsequent planned operation of space stations, large unmanned space structures, lunar and Mars bases, and the necessity of providing 'guaranteed' commercial launches have placed increased emphasis on understanding and mastering every aspect of launch vehicle operations. The Center of Space Construction has acquired historical launch vehicle data and is applying these data to the analysis of space launch vehicle logistic support of space construction. This analysis will include development of a better understanding of launch-on-time capability and simulation of required support systems for vehicle assembly and launch which are necessary to support national space program construction schedules. In this paper, the author presents actual launch data on unscheduled 'hold' distributions of various launch vehicles. The data have been supplied by industrial associate companies of the Center for Space Construction. The paper seeks to determine suitable probability models which describe these historical data and that can be used for several purposes such as: inputs to broader simulations of launch vehicle logistic space construction support processes and the determination of which launch operations sources cause the majority of the unscheduled 'holds', and hence to suggest changes which might improve launch-on-time. In particular, the paper investigates the ability of a compound distribution probability model to fit actual data, versus alternative models, and recommends the most productive avenues for future statistical work.

  14. Constructing Aligned Assessments Using Automated Test Construction

    Science.gov (United States)

    Porter, Andrew; Polikoff, Morgan S.; Barghaus, Katherine M.; Yang, Rui

    2013-01-01

    We describe an innovative automated test construction algorithm for building aligned achievement tests. By incorporating the algorithm into the test construction process, along with other test construction procedures for building reliable and unbiased assessments, the result is much more valid tests than result from current test construction…

  15. A General Schema for Constructing One-Point Bases in the Lambda Calculus

    DEFF Research Database (Denmark)

    Goldberg, Mayer

    2001-01-01

    In this paper, we present a schema for constructing one-point bases for recursively enumerable sets of lambda terms. The novelty of the approach is that we make no assumptions about the terms for which the one-point basis is constructed: They need not be combinators and they may contain constants...... and free variables. The significance of the construction is twofold: In the context of the lambda calculus, it characterises one-point bases as ways of ``packaging'' sets of terms into a single term; And in the context of realistic programming languages, it implies that we can define a single procedure...

  16. Identifying behaviour patterns of construction safety using system archetypes.

    Science.gov (United States)

    Guo, Brian H W; Yiu, Tak Wing; González, Vicente A

    2015-07-01

    Construction safety management involves complex issues (e.g., different trades, multi-organizational project structure, constantly changing work environment, and transient workforce). Systems thinking is widely considered as an effective approach to understanding and managing the complexity. This paper aims to better understand dynamic complexity of construction safety management by exploring archetypes of construction safety. To achieve this, this paper adopted the ground theory method (GTM) and 22 interviews were conducted with participants in various positions (government safety inspector, client, health and safety manager, safety consultant, safety auditor, and safety researcher). Eight archetypes were emerged from the collected data: (1) safety regulations, (2) incentive programs, (3) procurement and safety, (4) safety management in small businesses (5) production and safety, (6) workers' conflicting goals, (7) blame on workers, and (8) reactive and proactive learning. These archetypes capture the interactions between a wide range of factors within various hierarchical levels and subsystems. As a free-standing tool, they advance the understanding of dynamic complexity of construction safety management and provide systemic insights into dealing with the complexity. They also can facilitate system dynamics modelling of construction safety process. Copyright © 2015 Elsevier Ltd. All rights reserved.

  17. SAFETY PERFORMANCE OF SUBCONTRACTORS IN THE PALESTINIAN CONSTRUCTION INDUSTRY

    Directory of Open Access Journals (Sweden)

    Adnan Enshassi

    2008-06-01

    Full Text Available Subcontractors perform most of the construction works and their effect on industry are apparent in different activities of construction. Therefore, subcontractors need more attention from government and contractors union. The aim of this paper is to identify, evaluate, and rank factors that influence safety performance of subcontractors in the Gaza Strip (Palestine according to their relative importance. The study concluded that reported accident rates will decrease among subcontractors and their workers if new workers are trained well in the work site and they are informed about dangerous places, and if a workable safety plan is well preplanned. The results also showed that reported accident rates increased among subcontractors when using old, unsafe equipment and due to the complexity or difficulty in the construction sites features. Owners and general contractors need to stipulate strict clauses for safety in the contract for improving safety record of subcontractors. Construction workers must receive proper job related safety and health training with a safety logbook. It is recommended that the subcontractors and workers should attend continuing safety programs on regular basis as part of their perquisite to work in construction sites.

  18. Construct exploit constraint in crash analysis by bypassing canary

    Science.gov (United States)

    Huang, Ning; Huang, Shuguang; Huang, Hui; Chang, Chao

    2017-08-01

    Selective symbolic execution is a common program testing technology. Developed on the basis of it, some crash analysis systems are often used to test the fragility of the program by constructing exploit constraints, such as CRAX. From the study of crash analysis based on symbolic execution, this paper find that this technology cannot bypass the canary stack protection mechanisms. This paper makes the improvement uses the API hook in Linux. Experimental results show that the use of API hook can effectively solve the problem that crash analysis cannot bypass the canary protection.

  19. Intervention Mapping as a framework for developing an intervention at the worksite for older construction workers.

    Science.gov (United States)

    Oude Hengel, Karen M; Joling, Catelijne I; Proper, Karin I; van der Molen, Henk F; Bongers, Paulien M

    2011-01-01

    The purpose of this study was to apply the Intervention Mapping approach as a framework in the development of a worksite intervention to improve the work ability of construction workers. Development of an intervention by using the Intervention Mapping approach. Construction worksite. Construction workers aged 45 years and older. According to the principles of Intervention Mapping, evidence from the literature was combined with data collected from stakeholders (e.g., construction workers, managers, providers). The Intervention Mapping approach resulted in an intervention with the following components: (1) two individual visits of a physical therapist to lower the physical workload, (2) a Rest-Break tool to improve the balance between work and recovery, and (3) two empowerment training sessions to increase the range of influence at the worksite. Application of Intervention Mapping in the development of a worksite prevention program was useful in the construction industry to obtain a positive attitude and commitment. Stakeholders could give input regarding the program components as well as provide specific leads for the practical intervention strategy. Moreover, it also gives insight in the current theoretical and empirical knowledge in the field of improving the work ability of older workers in the construction industry.

  20. Pathwise dynamic programming

    NARCIS (Netherlands)

    Bender, Christian; Gärtner, Christian; Schweizer, Nikolaus

    2017-01-01

    We present a novel method for deriving tight Monte Carlo confidence intervals for solutions of stochastic dynamic programming equations. Taking some approximate solution to the equation as an input, we construct pathwise recursions with a known bias. Suitably coupling the recursions for lower and