  1. Nuclear facility decommissioning and site remedial actions

    International Nuclear Information System (INIS)

    Knox, N.P.; Webb, J.R.; Ferguson, S.D.; Goins, L.F.; Owen, P.T.

    1990-09-01

    The 394 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the eleventh in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's Remedial Action Programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Programs, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Grand Junction Remedial Action Program, (7) Uranium Mill Tailings Management, (8) Technical Measurements Center, (9) Remedial Action Program, and (10) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and keywords. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects and analyzes information on remedial actions and relevant radioactive waste management technologies

  2. Nuclear facility decommissioning and site remedial actions

    Energy Technology Data Exchange (ETDEWEB)

    Knox, N.P.; Webb, J.R.; Ferguson, S.D.; Goins, L.F.; Owen, P.T.

    1990-09-01

    The 394 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the eleventh in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's Remedial Action Programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Programs, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Grand Junction Remedial Action Program, (7) Uranium Mill Tailings Management, (8) Technical Measurements Center, (9) Remedial Action Program, and (10) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and keywords. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects and analyzes information on remedial actions and relevant radioactive waste management technologies.

  3. Nuclear facility decommissioning and site remedial actions

    International Nuclear Information System (INIS)

    Owen, P.T.; Knox, N.P.; Ferguson, S.D.; Fielden, J.M.; Schumann, P.L.

    1989-09-01

    The 576 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the tenth in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Citations to foreign and domestic literature of all types--technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions--have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's Remedial Action Programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) General Remedial Action Program Studies. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title work, publication description, geographic location, subject category, and keywords

  4. Nuclear facility decommissioning and site remedial actions

    Energy Technology Data Exchange (ETDEWEB)

    Owen, P.T.; Knox, N.P.; Ferguson, S.D.; Fielden, J.M.; Schumann, P.L.

    1989-09-01

    The 576 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the tenth in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Citations to foreign and domestic literature of all types--technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions--have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's Remedial Action Programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) General Remedial Action Program Studies. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title work, publication description, geographic location, subject category, and keywords.

  5. Remediation of Soil at Nuclear Sites

    International Nuclear Information System (INIS)

    Holmes, R.; Boardman, C.; Robbins, R; Fox, Robert Vincent; Mincher, Bruce Jay

    2000-01-01

    As the major nuclear waste and decontamination and decommissioning projects progress, one of the remaining problems that faces the nuclear industry is that of site remediation. The range of contamination levels and contaminants is wide and varied and there is likely to be a significant volume of soil contaminated with transuranics and hazardous organic materials that could qualify as mixed TRU waste. There are many technologies that offer the potential for remediating this waste but few that tackle all or most of the contaminants and even fewer that have been deployed with confidence. This paper outlines the progress made in proving the ability of Supercritical Fluid Extraction as a method of remediating soil, classified as mixed (TRU) transuranic waste

  6. Nuclear facility decommissioning and site remedial actions: a selected bibliography

    Energy Technology Data Exchange (ETDEWEB)

    Owen, P.T.; Knox, N.P.; Fielden, J.M.; Johnson, C.A.

    1982-09-01

    This bibliography contains 693 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions. Foreign, as well as domestic, literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included in this publication. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's Remedial Action Program. Major chapters are Surplus Facilities Management Program, Nuclear Facilities Decommissioning, Formerly Utilized Sites Remedial Action Program, Uranium Mill Tailings Remedial Action Program, Grand Junction Remedial Action Program, and Uranium Mill Tailings Management. Chapter sections for chapters 1 and 2 include: Design, Planning, and Regulations; Site Surveys; Decontamination Studies; Dismantlement and Demolition; Land Decontamination and Reclamation; Waste Disposal; and General Studies. The references within each chapter are arranged alphabetically by leading author. References having no individual author are arranged by corporate author or by title. Indexes are provided for (1) author; (2) corporate affiliation; (3) title; (4) publication description; (5) geographic location; and (6) keywords. An appendix of 202 bibliographic references without abstracts or indexes has been included in this bibliography. This appendix represents literature identified but not abstracted due to time constraints.

  7. Nuclear facility decommissioning and site remedial actions: a selected bibliography

    International Nuclear Information System (INIS)

    Owen, P.T.; Knox, N.P.; Fielden, J.M.; Johnson, C.A.

    1982-09-01

    This bibliography contains 693 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions. Foreign, as well as domestic, literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included in this publication. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's Remedial Action Program. Major chapters are Surplus Facilities Management Program, Nuclear Facilities Decommissioning, Formerly Utilized Sites Remedial Action Program, Uranium Mill Tailings Remedial Action Program, Grand Junction Remedial Action Program, and Uranium Mill Tailings Management. Chapter sections for chapters 1 and 2 include: Design, Planning, and Regulations; Site Surveys; Decontamination Studies; Dismantlement and Demolition; Land Decontamination and Reclamation; Waste Disposal; and General Studies. The references within each chapter are arranged alphabetically by leading author. References having no individual author are arranged by corporate author or by title. Indexes are provided for (1) author; (2) corporate affiliation; (3) title; (4) publication description; (5) geographic location; and (6) keywords. An appendix of 202 bibliographic references without abstracts or indexes has been included in this bibliography. This appendix represents literature identified but not abstracted due to time constraints

  8. Topical Day on Site Remediation

    Energy Technology Data Exchange (ETDEWEB)

    Vandenhove, H [ed.

    1996-09-18

    Ongoing activities at the Belgian Nuclear Research Centre relating to site remediation and restoration are summarized. Special attention has been paid to the different phases of remediation including characterization, impact assessment, evaluation of remediation actions, and execution of remediation actions.

  9. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 13: Part 2, Indexes

    Energy Technology Data Exchange (ETDEWEB)

    Goins, L.F.; Webb, J.R.; Cravens, C.D.; Mallory, P.K.

    1992-09-01

    This is part 2 of a bibliography on nuclear facility decommissioning and site remedial action. This report contains indexes on the following: authors, corporate affiliation, title words, publication description, geographic location, subject category, and key word.

  10. Nuclear facility decommissioning and site remedial actions: A selected bibliography: Volume 7

    International Nuclear Information System (INIS)

    Owen, P.T.; Michelson, D.C.; Knox, N.P.; Fowler, J.W.

    1986-09-01

    The 644 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the seventh in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Foreign and domestic literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's remedial action program. Major chapters are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Grand Junction Remedial Action Program, (7) Uranium Mill Tailings Management, (8) Technical Measurements Center, and (9) General Remedial Action Program Studies. Chapter sections for chapters 1, 2, 5, and 7 include Design, Planning, and Regulations; Environmental Studies and Site Surveys; Health, Safety, and Biomedical Studies; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. References are arranged alphabetically by leading author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, and keywords. The appendix contains a list of frequently used acronyms and abbreviations

  11. Nuclear facility decommissioning and site remedial actions. Volume 6. A selected bibliography

    Energy Technology Data Exchange (ETDEWEB)

    Owen, P.T.; Michelson, D.C.; Knox, N.P.

    1985-09-01

    This bibliography of 683 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions is the sixth in a series of annual reports prepared for the US Department of Energy's Remedial Action Programs. Foreign as well as domestic literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's remedial action program. Major chapters are: (1) Surplus Facilities Management Program; (2) Nuclear Facilities Decommissioning; (3) Formerly Utilized Sites Remedial Action Program; (4) Facilities Contaminated with Natural Radioactivity; (5) Uranium Mill Tailings Remedial Action Program; (6) Grand Junction Remedial Action Program; (7) Uranium Mill Tailings Management; (8) Technical Measurements Center; and (9) General Remedial Action Program Studies. Chapter sections for chapters 1, 2, 5, and 7 include Design, Planning, and Regulations; Environmental Studies and Site Surveys; Health, Safety, and Biomedical Studies; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. The references within each chapter or section are arranged alphabetically by leading author. References having no individual author are arranged by corporate affiliation or by publication description.

  12. Nuclear facility decommissioning and site remedial actions. Volume 6. A selected bibliography

    International Nuclear Information System (INIS)

    Owen, P.T.; Michelson, D.C.; Knox, N.P.

    1985-09-01

    This bibliography of 683 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions is the sixth in a series of annual reports prepared for the US Department of Energy's Remedial Action Programs. Foreign as well as domestic literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's remedial action program. Major chapters are: (1) Surplus Facilities Management Program; (2) Nuclear Facilities Decommissioning; (3) Formerly Utilized Sites Remedial Action Program; (4) Facilities Contaminated with Natural Radioactivity; (5) Uranium Mill Tailings Remedial Action Program; (6) Grand Junction Remedial Action Program; (7) Uranium Mill Tailings Management; (8) Technical Measurements Center; and (9) General Remedial Action Program Studies. Chapter sections for chapters 1, 2, 5, and 7 include Design, Planning, and Regulations; Environmental Studies and Site Surveys; Health, Safety, and Biomedical Studies; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. The references within each chapter or section are arranged alphabetically by leading author. References having no individual author are arranged by corporate affiliation or by publication description

  13. Nuclear facility decommissioning and site remedial actions: a selected bibliography. Volume 5

    International Nuclear Information System (INIS)

    Owen, P.T.; Knox, N.P.; Chilton, B.D.; Baldauf, M.F.

    1984-09-01

    This bibliography of 756 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions is the fifth in a series of annual reports prepared for the US Department of Energy, Division of Remedial Action Projects. Foreign as well as domestic literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included in this publication. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's Remedial Action Program. Major chapters are: (1) Surplus Facilities Management Program; (2) Nuclear Facilities Decommissioning; (3) Formerly Utilized Sites Remedial Action Program; (4) Uranium Mill Tailings Remedial Action Program; (5) Grand Junction Remedial Action Program; (6) Uranium Mill Tailings Management; and (7) Technical Measurements Center. Chapter sections for chapters 1, 2, 4, and 6 include Design, Planning, and Regulations; Environmental Studies and Site Surveys; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. The references within each chapter or section are arranged alphabetically by leading author. References having no individual author are arranged by corporate author or by title. Indexes are provided for the categories of author, corporate affiliation, title, publication description, geographic location, and keywords. The Appendix contains a list of frequently used acronyms

  14. Nuclear facility decommissioning and site remedial actions: a selected bibliography. Volume 5

    Energy Technology Data Exchange (ETDEWEB)

    Owen, P.T.; Knox, N.P.; Chilton, B.D.; Baldauf, M.F.

    1984-09-01

    This bibliography of 756 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions is the fifth in a series of annual reports prepared for the US Department of Energy, Division of Remedial Action Projects. Foreign as well as domestic literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included in this publication. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's Remedial Action Program. Major chapters are: (1) Surplus Facilities Management Program; (2) Nuclear Facilities Decommissioning; (3) Formerly Utilized Sites Remedial Action Program; (4) Uranium Mill Tailings Remedial Action Program; (5) Grand Junction Remedial Action Program; (6) Uranium Mill Tailings Management; and (7) Technical Measurements Center. Chapter sections for chapters 1, 2, 4, and 6 include Design, Planning, and Regulations; Environmental Studies and Site Surveys; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. The references within each chapter or section are arranged alphabetically by leading author. References having no individual author are arranged by corporate author or by title. Indexes are provided for the categories of author, corporate affiliation, title, publication description, geographic location, and keywords. The Appendix contains a list of frequently used acronyms.

  15. Nuclear Facilities Decommissioning and site remedial actions: a selected bibliography. Vol. 2

    International Nuclear Information System (INIS)

    Owen, P.T.; Fielden, J.M.; Knox, N.P.; Trotter, ES.

    1981-10-01

    This bibliography of 643 references represents the second in a series on nuclear facility decommissioning and site remedial actions to be produced by the Radiation Effects Information Center (REIC) within the Information Center Complex, Information Division, Oak Ridge National Laboratory. The bibliography contains scientific, technical, economic, and regulatory information pertaining to the US Department of Energy's Remedial Action Program. Major chapters are: Surplus Facilities Management Program; Nuclear Facilities Decommissioning; Formerly Utilized Sites Remedial Action Program; and Uranium Mill Tailings Management. The references within each chapter are arranged alphabetically by leading author. References having no individual author are arranged by corporate affiliation or by title. Indexes are provided for: (1) author; (2) corporate affiliation; (3) title; (4) publication description; (5) geographic location; and (6) keywords. The bibliography was compiled from a specialized data base established and maintained by REIC to provide information support for the US Department of Energy's Remedial Action Program, under the cosponsorship of its four major components: Surplus Facilities Management Program; Formerly Utilized Sites Remedial Action Program; Uranium Mill Tailings Remedial Action Program; and the Grand Junction Remedial Action Program

  16. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Vol. 18. Part 2. Indexes

    International Nuclear Information System (INIS)

    1997-09-01

    This bibliography contains 3638 citations with abstracts of documents relevant to environmental restoration, nuclear facility decontamination and decommissioning (D ampersand D), uranium mill tailings management, and site remedial actions. This report is the eighteenth in a series of bibliographies prepared annually for the U.S. Department of Energy (DOE) Office of Environmental Restoration. Citations to foreign and domestic literature of all types - technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions - have been included in Part 1 of the report. The bibliography contains scientific, technical, financial, and regulatory information that pertains to DOE environmental restoration programs. The citations are separated by topic into 16 sections, including (1) DOE Environmental Restoration Program; (2) DOE D ampersand D Program; (3) Nuclear Facilities Decommissioning; (4) DOE Formerly Utilized Sites Remedial Action Programs; (5) NORM-Contaminated Site Restoration; (6) DOE Uranium Mill Tailings Remedial Action Project; (7) Uranium Mill Tailings Management; (8) DOE Site-Wide Remedial Actions; (9) DOE Onsite Remedial Action Projects; (10) Contaminated Site Remedial Actions; (11) DOE Underground Storage Tank Remediation; (12) DOE Technology Development, Demonstration, and Evaluations; (13) Soil Remediation; (14) Groundwater Remediation; (15) Environmental Measurements, Analysis, and Decision-Making; and (16) Environmental Management Issues. Within the 16 sections, the citations are sorted by geographic location. If a geographic location is not specified, the citations are sorted according to the document title. In Part 2 of the report, indexes are provided for author, author affiliation, selected title phrase, selected title word, publication description, geographic location, and keyword

  17. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Vol. 18. Part 2. Indexes

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-01

    This bibliography contains 3638 citations with abstracts of documents relevant to environmental restoration, nuclear facility decontamination and decommissioning (D&D), uranium mill tailings management, and site remedial actions. This report is the eighteenth in a series of bibliographies prepared annually for the U.S. Department of Energy (DOE) Office of Environmental Restoration. Citations to foreign and domestic literature of all types - technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions - have been included in Part 1 of the report. The bibliography contains scientific, technical, financial, and regulatory information that pertains to DOE environmental restoration programs. The citations are separated by topic into 16 sections, including (1) DOE Environmental Restoration Program; (2) DOE D&D Program; (3) Nuclear Facilities Decommissioning; (4) DOE Formerly Utilized Sites Remedial Action Programs; (5) NORM-Contaminated Site Restoration; (6) DOE Uranium Mill Tailings Remedial Action Project; (7) Uranium Mill Tailings Management; (8) DOE Site-Wide Remedial Actions; (9) DOE Onsite Remedial Action Projects; (10) Contaminated Site Remedial Actions; (11) DOE Underground Storage Tank Remediation; (12) DOE Technology Development, Demonstration, and Evaluations; (13) Soil Remediation; (14) Groundwater Remediation; (15) Environmental Measurements, Analysis, and Decision-Making; and (16) Environmental Management Issues. Within the 16 sections, the citations are sorted by geographic location. If a geographic location is not specified, the citations are sorted according to the document title. In Part 2 of the report, indexes are provided for author, author affiliation, selected title phrase, selected title word, publication description, geographic location, and keyword.

  18. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 13: Part 1, Main text

    Energy Technology Data Exchange (ETDEWEB)

    Goins, L.F.; Webb, J.R.; Cravens, C.D.; Mallory, P.K.

    1992-09-01

    This publication contains 1035 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions. These citations constitute the thirteenth in a series of reports prepared annually for the US Department of Energy (DOE) Environmental Restoration programs. Citations to foreign and domestic literature of all types. There are 13 major sections of the publication, including: (1) DOE Decontamination and Decommissioning Program; (2) Nuclear Facilities Decommissioning; (3) DOE Formerly Utilized Sites Remedial Action Program; (4) DOE Uranium Mill Tailings Remedial Action Project; (5) Uranium Mill Tailings Management; (6) DOE Environmental Restoration Program; (7) DOE Site-Specific Remedial Actions; (8) Contaminated Site Restoration; (9) Remediation of Contaminated Soil and Groundwater; (10) Environmental Data Measurements, Management, and Evaluation; (11) Remedial Action Assessment and Decision-Making; (12) Technology Development and Evaluation; and (13) Environmental and Waste Management Issues. Bibliographic references are arranged in nine subject categories by geographic location and then alphabetically by first author, corporate affiliation, or publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and key word.

  19. Nuclear facility decommissioning and site remedial actions: A selected bibliography: Volume 8

    Energy Technology Data Exchange (ETDEWEB)

    Owen, P.T.; Michelson, D.C.; Knox, N.P.

    1987-09-01

    The 553 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the eighth in a series of reports. Foreign and domestic literature of all types - technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions - has been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of energy's remedial action program. Major chapters are Surplus Facilities Management Program, Nuclear Facilities Decommissioning, Formerly Utilized Sites Remedial Action Program, Facilities Contaminated with Naturally Occurring Radionuclides, Uranium Mill Tailings Remedial Action Program, Uranium Mill Tailings Management, Technical Measurements Center, and General Remedial Action Program Studies. Chapter sections for chapters 1, 2, 5, and 6 include Design, Planning, and Regulations; Environmental Studies and Site Surveys; Health, Safety, and Biomedical Studies; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, and keywords. The appendix contains a list of frequently used acronyms and abbreviations.

  20. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 13: Part 1, Main text

    International Nuclear Information System (INIS)

    Goins, L.F.; Webb, J.R.; Cravens, C.D.; Mallory, P.K.

    1992-09-01

    This publication contains 1035 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions. These citations constitute the thirteenth in a series of reports prepared annually for the US Department of Energy (DOE) Environmental Restoration programs. Citations to foreign and domestic literature of all types. There are 13 major sections of the publication, including: (1) DOE Decontamination and Decommissioning Program; (2) Nuclear Facilities Decommissioning; (3) DOE Formerly Utilized Sites Remedial Action Program; (4) DOE Uranium Mill Tailings Remedial Action Project; (5) Uranium Mill Tailings Management; (6) DOE Environmental Restoration Program; (7) DOE Site-Specific Remedial Actions; (8) Contaminated Site Restoration; (9) Remediation of Contaminated Soil and Groundwater; (10) Environmental Data Measurements, Management, and Evaluation; (11) Remedial Action Assessment and Decision-Making; (12) Technology Development and Evaluation; and (13) Environmental and Waste Management Issues. Bibliographic references are arranged in nine subject categories by geographic location and then alphabetically by first author, corporate affiliation, or publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and key word

  1. Nuclear facility decommissioning and site remedial actions: A selected bibliography: Volume 8

    International Nuclear Information System (INIS)

    Owen, P.T.; Michelson, D.C.; Knox, N.P.

    1987-09-01

    The 553 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the eighth in a series of reports. Foreign and domestic literature of all types - technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions - has been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of energy's remedial action program. Major chapters are Surplus Facilities Management Program, Nuclear Facilities Decommissioning, Formerly Utilized Sites Remedial Action Program, Facilities Contaminated with Naturally Occurring Radionuclides, Uranium Mill Tailings Remedial Action Program, Uranium Mill Tailings Management, Technical Measurements Center, and General Remedial Action Program Studies. Chapter sections for chapters 1, 2, 5, and 6 include Design, Planning, and Regulations; Environmental Studies and Site Surveys; Health, Safety, and Biomedical Studies; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, and keywords. The appendix contains a list of frequently used acronyms and abbreviations

  2. Nuclear facility decommissioning and site remedial actions: A selected bibliography, volume 9

    Energy Technology Data Exchange (ETDEWEB)

    Owen, P.T.; Knox, N.P.; Michelson, D.C.; Turmer, G.S.

    1988-09-01

    The 604 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the ninth in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Foreign and domestic literature of all types--technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions--has been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's remedial action programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) General Remedial Action Program Studies. Subsections for sections 1, 2, 5, and 6 include: Design, Planning, and Regulations; Environmental Studies and Site Surveys; Health, Safety, and Biomedical Studies; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, and keywords. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects and analyzes information on remedial actions and relevant radioactive waste management technologies. RAPIC staff and resources are available to meet a variety of information needs. Contact the center at (615) 576-0568 or FTS 626-0568.

  3. Nuclear facility decommissioning and site remedial actions: A selected bibliography, volume 9

    International Nuclear Information System (INIS)

    Owen, P.T.; Knox, N.P.; Michelson, D.C.; Turmer, G.S.

    1988-09-01

    The 604 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the ninth in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Foreign and domestic literature of all types--technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions--has been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's remedial action programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) General Remedial Action Program Studies. Subsections for sections 1, 2, 5, and 6 include: Design, Planning, and Regulations; Environmental Studies and Site Surveys; Health, Safety, and Biomedical Studies; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, and keywords. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects and analyzes information on remedial actions and relevant radioactive waste management technologies. RAPIC staff and resources are available to meet a variety of information needs. Contact the center at (615) 576-0568 or FTS 626-0568

  4. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 12

    International Nuclear Information System (INIS)

    1991-09-01

    The 664 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the twelfth in a series of reports prepared annually for the US Department of Energy Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy Remedial Action Programs. Major sections are (1) Decontamination and Decommissioning Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and key word. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects, analyzes, and disseminates information on environmental restoration and remedial actions. RAPIC staff and resources are available to meet a variety of information needs. Contact the center at FTS 624-7764 or (615) 574-7764

  5. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 12. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    1991-09-01

    The 664 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the twelfth in a series of reports prepared annually for the US Department of Energy Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy Remedial Action Programs. Major sections are (1) Decontamination and Decommissioning Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and key word. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects, analyzes, and disseminates information on environmental restoration and remedial actions. RAPIC staff and resources are available to meet a variety of information needs. Contact the center at FTS 624-7764 or (615) 574-7764.

  6. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 12

    Energy Technology Data Exchange (ETDEWEB)

    Owen, P. T.; Webb, J. R.; Knox, N. P.; Goins, L. F.; Harrell, R. E.; Mallory, P. K.; Cravens, C. D.

    1991-09-01

    The 664 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the twelfth in a series of reports prepared annually for the US Department of Energy Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy Remedial Action Programs. Major sections are (1) Decontamination and Decommissioning Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and key word. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects, analyzes, and disseminates information on environmental restoration and remedial actions. RAPIC staff and resources are available to meet a variety of information needs. Contact the center at FTS 624-7764 or (615) 574-7764.

  7. Nuclear facility decommissioning and site remedial actions: a selected bibliography. Volume 4

    International Nuclear Information System (INIS)

    Owen, P.T.; Knox, N.P.; Fielden, J.M.; Faust, R.A.

    1983-09-01

    This bibliography of 657 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions is the fourth in a series of annual reports prepared for the US Department of Energy, Division of Remedial Action Projects. Foreign as well as domestic documents of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - have been references in this publication. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's Remedial Action Program. Major chapters are: (1) Surplus Facilities Management Program; (2) Nuclear Facilities Decommissioning; (3) Formerly Utilized Sites Remedial Action Program; (4) Uranium Mill Tailings Remedial Action Program; (5) Grand Junction Remedial Action Program; and (6) Uranium Mill Tailings Management. Chapter sections for chapters 1 and 2 include: Design, Planning, and Regulations; Site Surveys; Decontamination Studies; Dismantlement and Demolition; Land Decontamination and Reclamation; Waste Disposal; and General studies. The references within each chapter or section are arranged alphabetically by leading author. References having no individual author are arranged by corporate author, or by title. Indexes are provided for the categories of author, corporate affiliation, title, publication description, geographic location, and keywords. Appendix A lists 264 bibliographic references to literature identified during this reporting period but not abstracted due to time constraints. Title and publication description indexes are given for this appendix. Appendix B defines frequently used acronyms, and Appendix C lists the recipients of this report according to their corporate affiliation

  8. Nuclear facility decommissioning and site remedial actions: a selected bibliography. Volume 4

    Energy Technology Data Exchange (ETDEWEB)

    Owen, P.T.; Knox, N.P.; Fielden, J.M.; Faust, R.A.

    1983-09-01

    This bibliography of 657 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions is the fourth in a series of annual reports prepared for the US Department of Energy, Division of Remedial Action Projects. Foreign as well as domestic documents of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - have been references in this publication. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's Remedial Action Program. Major chapters are: (1) Surplus Facilities Management Program; (2) Nuclear Facilities Decommissioning; (3) Formerly Utilized Sites Remedial Action Program; (4) Uranium Mill Tailings Remedial Action Program; (5) Grand Junction Remedial Action Program; and (6) Uranium Mill Tailings Management. Chapter sections for chapters 1 and 2 include: Design, Planning, and Regulations; Site Surveys; Decontamination Studies; Dismantlement and Demolition; Land Decontamination and Reclamation; Waste Disposal; and General studies. The references within each chapter or section are arranged alphabetically by leading author. References having no individual author are arranged by corporate author, or by title. Indexes are provided for the categories of author, corporate affiliation, title, publication description, geographic location, and keywords. Appendix A lists 264 bibliographic references to literature identified during this reporting period but not abstracted due to time constraints. Title and publication description indexes are given for this appendix. Appendix B defines frequently used acronyms, and Appendix C lists the recipients of this report according to their corporate affiliation.

  9. Nuclear Site Remediation and Restoration during Decommissioning of Nuclear Installations. A Report by the NEA Co-operative Programme on Decommissioning

    International Nuclear Information System (INIS)

    Orr, Peter; Mitchell, Nick; Mobbs, Shelly; Bennest, Terry; Abu-Eid, Rateb-Boby; Berton, Marie-Anne; Dehaye, Catherine Ollivier; Pellenz, Gilles; Cruikshank, Julian; Diaz Arocas, Paloma; Garcia Tapias, Ester; Hess, Norbert; Hong, Sam-Bung; Miller, Susan; Monken-Fernandes, Horst; ); Morse, John; Nitzsche, Olaf; Ooms, Bart; Osimani, Celso; Stuart Walker

    2014-01-01

    Decommissioning of nuclear facilities and related remedial actions are currently being undertaken around the world to enable sites or parts of sites to be reused for other purposes. Remediation has generally been considered as the last step in a sequence of decommissioning steps, but the values of prevention, long-term planning and parallel remediation are increasingly being recognised as important steps in the process. This report, prepared by the Task Group on Nuclear Site Restoration of the NEA Co-operative Programme on Decommissioning, highlights lessons learnt from remediation experiences of NEA member countries that may be particularly helpful to practitioners of nuclear site remediation, regulators and site operators. It provides observations and recommendations to consider in the development of strategies and plans for efficient nuclear site remediation that ensures protection of workers and the environment. (authors)

  10. Electrokinetic remediation of plutonium-contaminated nuclear site wastes: Results from a pilot-scale on-site trial

    International Nuclear Information System (INIS)

    Agnew, Kieran; Cundy, Andrew B.; Hopkinson, Laurence; Croudace, Ian W.; Warwick, Phillip E.; Purdie, Philip

    2011-01-01

    This paper examines the field-scale application of a novel low-energy electrokinetic technique for the remediation of plutonium-contaminated nuclear site soils, using soil wastes from the Atomic Weapons Establishment (AWE) Aldermaston site, Berkshire, UK as a test medium. Soils and sediments with varying composition, contaminated with Pu through historical site operations, were electrokinetically treated at laboratory-scale with and without various soil pre-conditioning agents. Results from these bench-scale trials were used to inform a larger on-site remediation trial, using an adapted containment pack with battery power supply. 2.4 m 3 (ca. 4 tonnes) of Pu-contaminated soil was treated for 60 days at a power consumption of 33 kW h/m 3 , and then destructively sampled. Radiochemical data indicate mobilisation of Pu in the treated soil, and migration (probably as a negatively charged Pu-citrate complex) towards the anodic compartment of the treatment cell. Soil in the cathodic zone of the treatment unit was remediated to a level below free-release disposal thresholds (1.7 Bq/g, or <0.4 Bq/g above background activities). The data show the potential of this method as a low-cost, on-site tool for remediation of radioactively contaminated soils and wastes which can be operated remotely on working sites, with minimal disruption to site infrastructure or operations.

  11. Nuclear facility decommissioning and site remedial actions. Volume 1. A selected bibliography

    Energy Technology Data Exchange (ETDEWEB)

    Faust, R.A.; Fore, C.S.; Knox, N.P.

    1980-09-01

    This bibliography of 633 references represents the first in a series to be produced by the Remedial Actions Program Information Center (RAPIC) containing scientific, technical, economic, and regulatory information concerning the decommissioning of nuclear facilities. Major chapters selected for this bibliography are Facility Decommissioning, Uranium Mill Tailings Cleanup, Contaminated Site Restoration, and Criteria and Standards. The references within each chapter are arranged alphabetically by leading author, corporate affiliation, or title of the document. When the author is not given, the corporate affiliation appears first. If these two levels of authorship are not given, the title of the document is used as the identifying level. Indexes are provided for (1) author(s), (2) keywords, (3) title, (4) technology development, and (5) publication description. An appendix of 123 entries lists recently acquired references relevant to decommissioning of nuclear facilities. These references are also arranged according to one of the four subject categories and followed by author, title, and publication description indexes. The bibliography was compiled from a specialized data base established and maintained by RAPIC to provide information support for the Department of Energy's Remedial Actions Program, under the cosponsorship of its three major components: Surplus Facilities Management Program, Uranium Mill Tailings Remedial Actions Program, and Formerly Utilized Sites Remedial Actions Program. RAPIC is part of the Ecological Sciences Information Center within the Information Center Complex at Oak Ridge National Laboratory.

  12. Nuclear facility decommissioning and site remedial actions. Volume 1. A selected bibliography

    International Nuclear Information System (INIS)

    Faust, R.A.; Fore, C.S.; Knox, N.P.

    1980-09-01

    This bibliography of 633 references represents the first in a series to be produced by the Remedial Actions Program Information Center (RAPIC) containing scientific, technical, economic, and regulatory information concerning the decommissioning of nuclear facilities. Major chapters selected for this bibliography are Facility Decommissioning, Uranium Mill Tailings Cleanup, Contaminated Site Restoration, and Criteria and Standards. The references within each chapter are arranged alphabetically by leading author, corporate affiliation, or title of the document. When the author is not given, the corporate affiliation appears first. If these two levels of authorship are not given, the title of the document is used as the identifying level. Indexes are provided for (1) author(s), (2) keywords, (3) title, (4) technology development, and (5) publication description. An appendix of 123 entries lists recently acquired references relevant to decommissioning of nuclear facilities. These references are also arranged according to one of the four subject categories and followed by author, title, and publication description indexes. The bibliography was compiled from a specialized data base established and maintained by RAPIC to provide information support for the Department of Energy's Remedial Actions Program, under the cosponsorship of its three major components: Surplus Facilities Management Program, Uranium Mill Tailings Remedial Actions Program, and Formerly Utilized Sites Remedial Actions Program. RAPIC is part of the Ecological Sciences Information Center within the Information Center Complex at Oak Ridge National Laboratory

  13. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 13: Part 2, Indexes. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Goins, L.F.; Webb, J.R.; Cravens, C.D.; Mallory, P.K.

    1992-09-01

    This is part 2 of a bibliography on nuclear facility decommissioning and site remedial action. This report contains indexes on the following: authors, corporate affiliation, title words, publication description, geographic location, subject category, and key word.

  14. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 18. Part 1B: Citations with abstracts, sections 10 through 16

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-01

    This bibliography contains 3,638 citations with abstracts of documents relevant to environmental restoration, nuclear facility decontamination and decommissioning (D and D), uranium mill tailings management, and site remedial actions. The bibliography contains scientific, technical, financial, and regulatory information that pertains to DOE environmental restoration programs. The citations are separated by topic into 16 sections, including (1) DOE Environmental Restoration Program; (2) DOE D and D Program; (3) Nuclear Facilities Decommissioning; (4) DOE Formerly Utilized sites Remedial Action Program; (5) NORM-Contaminated Site Restoration; (6) DOE Uranium Mill Tailings Remedial Action Project; (7) Uranium Mill Tailings Management; (8) DOE Site-Wide Remedial Actions; (9) DOE Onsite Remedial Action Projects; (10) Contaminated Site Remedial Actions; (11) DOE Underground Storage Tank Remediation; (12) DOE Technology Development, Demonstration, and Evaluation; (13) Soil Remediation; (14) Groundwater Remediation; (15) Environmental Measurements, Analysis, and Decision-Making; and (16) Environmental Management Issues.

  15. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 18. Part 1A: Citations with abstracts, sections 1 through 9

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-01

    This bibliography contains 3,638 citations with abstracts of documents relevant to environmental restoration, nuclear facility decontamination and decommissioning (D and D), uranium mill tailings management, and site remedial actions. The bibliography contains scientific, technical, financial, and regulatory information that pertains to DOE environmental restoration programs. The citations are separated by topic into 16 sections, including (1) DOE Environmental Restoration program; (2) DOE D and D Program; (3) Nuclear Facilities Decommissioning; (4) DOE Formerly Utilized Sites Remedial Action Program; (5) NORM-Contaminated Site Restoration; (6) DOE Uranium Mill Tailings Remedial Action Project; (7) Uranium Mill Tailings Management; (8) DOE Site-Wide Remedial Actions; (9) DOE Onsite Remedial Action Projects; (10) Contaminated Site Remedial Actions; (11) DOE Underground Storage Tank Remediation; (12) DOE Technology Development, Demonstration, and Evaluation; (13) Soil Remediation; (14) Groundwater Remediation; (15) Environmental Measurements, Analysis, and Decision-Making; and (16) Environmental Management Issues.

  16. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 13: Part 1, Main text. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Goins, L.F.; Webb, J.R.; Cravens, C.D.; Mallory, P.K.

    1992-09-01

    This publication contains 1035 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions. These citations constitute the thirteenth in a series of reports prepared annually for the US Department of Energy (DOE) Environmental Restoration programs. Citations to foreign and domestic literature of all types. There are 13 major sections of the publication, including: (1) DOE Decontamination and Decommissioning Program; (2) Nuclear Facilities Decommissioning; (3) DOE Formerly Utilized Sites Remedial Action Program; (4) DOE Uranium Mill Tailings Remedial Action Project; (5) Uranium Mill Tailings Management; (6) DOE Environmental Restoration Program; (7) DOE Site-Specific Remedial Actions; (8) Contaminated Site Restoration; (9) Remediation of Contaminated Soil and Groundwater; (10) Environmental Data Measurements, Management, and Evaluation; (11) Remedial Action Assessment and Decision-Making; (12) Technology Development and Evaluation; and (13) Environmental and Waste Management Issues. Bibliographic references are arranged in nine subject categories by geographic location and then alphabetically by first author, corporate affiliation, or publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and key word.

  17. Remedial actions of nuclear safety shot sites: Double Tracks and Clean Slates

    International Nuclear Information System (INIS)

    Sanchez, M.; Shotton, M.; Lyons, C.

    1998-03-01

    Remedial actions of plutonium (Pu)-contaminated soils are in the preliminary stages of development at the Nevada Test Site (NTS). Interim clean-up actions were completed at the Double Tracks and Clean Slate 1 safety shot sites in 1996 and 1997, respectively. Soil at both sites, with a total transuranic activity greater than 20 picoCuries per gram (pCi/g), was excavated and shipped to the NTS for disposal. Characterization and assessment efforts were initiated at the Double Tracks site in 1995, and the clean-up of this site as an interim action was completed in 1996. Clean-up of this site consisted of taking site-specific data and applying rationale for dose and risk calculations in selecting parameter values for the interim corrective action level. The remediation process included excavating and stockpiling the contaminated soil and loading the soil into supersacks with approximately 1,513 cubic meters (53,500 cubic feet) being shipped to the NTS for disposal. In 1997, remediation began on the Clean Slate 1 site on which characterization had already been completed using a very similar approach; however, the site incorporated lessons learned, cost efficiencies, and significant improvements to the process. This paper focuses on those factors and the progress that has been made in cleaning up the sites. The application of a technically reasonable remediation method, as well as the cost factors that supported transport and disposal of the low-level waste in bulk are discussed

  18. Salmon Site Remedial Investigation Report

    International Nuclear Information System (INIS)

    1999-01-01

    This Salmon Site Remedial Investigation Report provides the results of activities initiated by the U.S. Department of Energy (DOE) to determine if contamination at the Salmon Site poses a current or future risk to human health and the environment. These results were used to develop and evaluate a range of risk-based remedial alternatives. Located in Lamar County, Mississippi, the Salmon Site was used by the U.S. Atomic Energy Commission (predecessor to the DOE) between 1964 and 1970 for two nuclear and two gas explosions conducted deep underground in a salt dome. The testing resulted in the release of radionuclides into the salt dome. During reentry drilling and other site activities, liquid and solid wastes containing radioactivity were generated resulting in surface soil and groundwater contamination. Most of the waste and contaminated soil and water were disposed of in 1993 during site restoration either in the cavities left by the tests or in an injection well. Other radioactive wastes were transported to the Nevada Test Site for disposal. Nonradioactive wastes were disposed of in pits at the site and capped with clean soil and graded. The preliminary investigation showed residual contamination in the Surface Ground Zero mud pits below the water table. Remedial investigations results concluded the contaminant concentrations detected present no significant risk to existing and/or future land users, if surface institutional controls and subsurface restrictions are maintained. Recent sampling results determined no significant contamination in the surface or shallow subsurface. The test cavity resulting from the experiments is contaminated and cannot be economically remediated with existing technologies. The ecological sampling did not detect biological uptake of contaminants in the plants or animals sampled. Based on the current use of the Salmon Site, the following remedial actions were identified to protect both human health and the environment: (1) the

  19. Site remediation techniques in India: a review

    International Nuclear Information System (INIS)

    Anomitra Banerjee; Miller Jothi

    2013-01-01

    India is one of the developing countries operating site remediation techniques for the entire nuclear fuel cycle waste for the last three decades. In this paper we intend to provide an overview of remediation methods currently utilized at various hazardous waste sites in India, their advantages and disadvantages. Over the years the site remediation techniques have been well characterized and different processes for treatment, conditioning and disposal are being practiced. Remediation Methods categorized as biological, chemical or physical are summarized for contaminated soils and environmental waters. This paper covers the site remediation techniques implemented for treatment and conditioning of wastelands arising from the operation of nuclear power plant, research reactors and fuel reprocessing units. (authors)

  20. Radiation effects issues related to US DOE site remediation and nuclear waste storage

    International Nuclear Information System (INIS)

    Weber, W.J.; Ewing, R.C.

    1994-10-01

    Site restoration activities at DOE facilities and the permanent disposal of nuclear waste generated at the same DOE facilities involve working with and within various types and levels of radiation fields. Radionuclide decay and the associated radiation fields lead to physical and chemical changes that can degrade or enhance material properties. This paper reviews the impact of radiation fields on site restoration activities and on the release rate of radionuclides to the biosphere from nuclear waste forms

  1. MGP site remediation: Working toward presumptive remedies

    International Nuclear Information System (INIS)

    Larsen, B.R.

    1996-01-01

    Manufactured Gas Plants (MGPs) were prevalent in the United States during the 19th and first half of the 20th centuries. MGPs produced large quantities of waste by-products, which varied depending on the process used to manufacture the gas, but most commonly were tars and polynuclear aromatic hydrocarbons. There are an estimated 3,000 to 5,000 abandoned MGP sites across the United States. Because these sites are not concentrated in one geographic location and at least three different manufacturing processes were used, the waste characteristics are very heterogeneous. The question of site remediation becomes how to implement a cost-effective remediation with the variety of cleanup technologies available for these sites. Because of the significant expenditure required for characterization and cleanup of MGP sites, owners and regulatory agencies are beginning to look at standardizing cleanup technologies for these sites. This paper discusses applicable cleanup technologies and the attitude of state regulatory agencies towards the use of presumptive remedies, which can reduce the amount of characterization and detailed analysis necessary for any particular site. Additionally, this paper outlines the process of screening and evaluating candidate technologies, and the progress being made to match the technology to the site

  2. Waste management facility remediation and decommissioning at a national nuclear research site

    International Nuclear Information System (INIS)

    Cameron, D.J.; Dolinar, G.M.; Killey, R.W.D.

    1994-01-01

    Historic waste management practices at eight locations on AECL's Chalk River site have resulted in the formation of contaminated groundwater plumes, some of which have surfaced and contaminated surface materials. A priority setting process has been used to establish a plan of attack that will lead to the eventual decommissioning of these facilities. In general terms, the preferred approach is to install impermeable covers to prevent further leaching of waste sources and to prevent escape of leachate to the biosphere, followed by cleanup of surface contamination and remediation of aquifers. Final disposal of the waste sources would be delayed for perhaps 20 years. Substantial progress has been made in the treatment of contaminated groundwater, with one field installation in place and another under development. This paper describes how the prioritization task was tackled to produce a long term plan of action and describes initial interventions that have been attempted and their results. 4 refs., 3 tabs., 3 figs

  3. Site remediation: The naked truth

    International Nuclear Information System (INIS)

    Calloway, J.M.

    1991-01-01

    The objective of any company faced with an environmental site remediation project is to perform the cleanup effectively at the lowest possible cost. Today, there are a variety of techniques being applied in the remediation of sites involving soils and sludges. The most popular include: stabilization, incineration, bioremediation and off-site treatment. Dewatering may also play an integral role in a number of these approaches. Selecting the most cost-effective technique for remediation of soils and sludges can be a formidable undertaking, namely because it is often difficult to quantify certain expenses in advance of the project. In addition to providing general cost guidelines for various aspects of soil and sludge remediation, this paper will show how some significant cost factors can be affected by conditions related to specific remediation projects and the cleanup technology being applied

  4. French uranium mining sites remediation

    International Nuclear Information System (INIS)

    Roche, M.

    2002-01-01

    Following a presentation of the COGEMA's general policy for the remediation of uranium mining sites and the regulatory requirements, the current phases of site remediation operations are described. Specific operations for underground mines, open pits, milling facilities and confining the milled residues to meet long term public health concerns are detailed and discussed in relation to the communication strategies to show and explain the actions of COGEMA. A brief review of the current remediation situation at the various French facilities is finally presented. (author)

  5. Compliance monitoring for remediated sites

    International Nuclear Information System (INIS)

    1999-10-01

    Throughout the world, many countries have experienced problems associated with pollution of the environment. Poorly managed practices in nuclear fuel cycle, medicine, industry, weapons production and testing, research and development activities, as well as accidents, and poor disposal practices have produced a large array of radioactively contaminated facilities and sites. Structures, biota, soils, rocks, and both surface and groundwaters have become contaminated with radionuclides and other associated contaminants, a condition that raises serious concern due to potential health effects to the exposed human populations and the environment. In response to the needs of its Member States in dealing with the problems of radioactive contamination in the environment, the IAEA has established an Environmental Restoration Project. The principal aspects of current IAEA efforts in this area include (1) gathering information and data, performing analyses, and publishing technical summaries, and other documents on key technical aspects of environmental restoration; (2) conducting a Co-ordinated Research Project on Environmental Restoration; and (3) providing direct technical assistance to Member States through technical co-operation programmes. The transfer of technologies to Member States in need of applicable methodologies and techniques for the remediation of contaminated sites is a principal objective of this project

  6. Superfund Record of Decision (EPA Region 4): Maxey Flats Nuclear Disposal site, Fleming County, KY. (First remedial action), September 1991. Final report

    International Nuclear Information System (INIS)

    1991-01-01

    The 280-acre Maxey Flats Nuclear Disposal site is an inactive low-level radioactive waste disposal facility in Fleming County, Kentucky. The estimated 663 people who reside within 2.5 miles of the site use the public water supply for drinking purposes. From 1962 to 1977, Nuclear Engineering Company, Inc. (NECO), operated a solid by-product, source, and special nuclear material disposal facility under a license with the State. Several State investigations in the 1970's revealed that leachate contaminated with tritium and other radioactive substances was migrating from the disposal trenches to unrestricted areas. The Record of Decision (ROD) addresses final remediation of soil, debris, and associated leachate. The primary contaminants of concern affecting the soil and debris are VOCs including benzene, TCE, and toluene; metals including arsenic and lead; and radioactive materials. The selected remedial action for the site is included

  7. Status report: Fernald site remediation

    International Nuclear Information System (INIS)

    Craig, J.R. Jr.; Saric, J.A.; Schneider, T.; Yates, M.K.

    1995-01-01

    The Fernald site is rapidly transitioning from a Remedial Investigation/ Feasibility Study (RI/FS) site to one where design and construction of the remedies dominates. Fernald is one of the first sites in the Department of Energy (DOE) complex to accomplish this task and real physical progress is being made in moving the five operable units through the CERCLA process. Two of the required Records of Decision (ROD) are in hand and all five operable units will have received their RODs (IROD for OU3) by the end of 1995. Pre-design investigations, design work or construction are now in progress on the operable units. The lessons learned from the work done to date include implementing innovations in the RI and FS process as well as effective use of Removal Actions to begin the actual site remediation. Also, forging close working relationships with the Federal and State Regulators, citizens action groups and the Fernald Citizens Task Force has helped move the program forward. The Fernald successes have been achieved by close coordination and cooperation among all groups working on the projects and by application of innovative technologies within the decision making process

  8. Salmon Site Remedial Investigation Report, Appendix D

    International Nuclear Information System (INIS)

    1999-01-01

    This Salmon Site Remedial Investigation Report provides the results of activities initiated by the U.S. Department of Energy (DOE) to determine if contamination at the Salmon Site poses a current or future risk to human health and the environment. These results were used to develop and evaluate a range of risk-based remedial alternatives. Located in Lamar County, Mississippi, the Salmon Site was used by the U.S. Atomic Energy Commission (predecessor to the DOE) between 1964 and 1970 for two nuclear and two gas explosions conducted deep underground in a salt dome. The testing resulted in the release of radionuclides into the salt dome. During reentry drilling and other site activities, liquid and solid wastes containing radioactivity were generated resulting in surface soil and groundwater contamination. Most of the waste and contaminated soil and water were disposed of in 1993 during site restoration either in the cavities left by the tests or in an injection well. Other radioactive wastes were transported to the Nevada Test Site for disposal. Nonradioactive wastes were disposed of in pits at the site and capped with clean soil and graded. The preliminary investigation showed residual contamination in the Surface Ground Zero mud pits below the water table. Remedial investigations results concluded the contaminant concentrations detected present no significant risk to existing and/or future land users, if surface institutional controls and subsurface restrictions are maintained. Recent sampling results determined no significant contamination in the surface or shallow subsurface. The test cavity resulting from the experiments is contaminated and cannot be economically remediated with existing technologies. The ecological sampling did not detect biological uptake of contaminants in the plants or animals sampled. Based on the current use of the Salmon Site, the following remedial actions were identified to protect both human health and the environment: (1) the

  9. Salmon Site Remediation Investigation Report, Appendix A

    International Nuclear Information System (INIS)

    1999-01-01

    This Salmon Site Remedial Investigation Report provides the results of activities initiated by the U.S. Department of Energy (DOE) to determine if contamination at the Salmon Site poses a current or future risk to human health and the environment. These results were used to develop and evaluate a range of risk-based remedial alternatives. Located in Lamar County, Mississippi, the Salmon Site was used by the U.S. Atomic Energy Commission (predecessor to the DOE) between 1964 and 1970 for two nuclear and two gas explosions conducted deep underground in a salt dome. The testing resulted in the release of radionuclides into the salt dome. During reentry drilling and other site activities, liquid and solid wastes containing radioactivity were generated resulting in surface soil and groundwater contamination. Most of the waste and contaminated soil and water were disposed of in 1993 during site restoration either in the cavities left by the tests or in an injection well. Other radioactive wastes were transported to the Nevada Test Site for disposal. Nonradioactive wastes were disposed of in pits at the site and capped with clean soil and graded. The preliminary investigation showed residual contamination in the Surface Ground Zero mud pits below the water table. Remedial investigations results concluded the contaminant concentrations detected present no significant risk to existing and/or future land users, if surface institutional controls and subsurface restrictions are maintained. Recent sampling results determined no significant contamination in the surface or shallow subsurface. The test cavity resulting from the experiments is contaminated and cannot be economically remediated with existing technologies. The ecological sampling did not detect biological uptake of contaminants in the plants or animals sampled. Based on the current use of the Salmon Site, the following remedial actions were identified to protect both human health and the environment: (1) the

  10. Salmon Site Remedial Investigation Report, Appendix C

    International Nuclear Information System (INIS)

    1999-01-01

    This Salmon Site Remedial Investigation Report provides the results of activities initiated by the U.S. Department of Energy (DOE) to determine if contamination at the Salmon Site poses a current or future risk to human health and the environment. These results were used to develop and evaluate a range of risk-based remedial alternatives. Located in Lamar County, Mississippi, the Salmon Site was used by the U.S. Atomic Energy Commission (predecessor to the DOE) between 1964 and 1970 for two nuclear and two gas explosions conducted deep underground in a salt dome. The testing resulted in the release of radionuclides into the salt dome. During reentry drilling and other site activities, liquid and solid wastes containing radioactivity were generated resulting in surface soil and groundwater contamination. Most of the waste and contaminated soil and water were disposed of in 1993 during site restoration either in the cavities left by the tests or in an injection well. Other radioactive wastes were transported to the Nevada Test Site for disposal. Nonradioactive wastes were disposed of in pits at the site and capped with clean soil and graded. The preliminary investigation showed residual contamination in the Surface Ground Zero mud pits below the water table. Remedial investigations results concluded the contaminant concentrations detected present no significant risk to existing and/or future land users, if surface institutional controls and subsurface restrictions are maintained. Recent sampling results determined no significant contamination in the surface or shallow subsurface. The test cavity resulting from the experiments is contaminated and cannot be economically remediated with existing technologies. The ecological sampling did not detect biological uptake of contaminants in the plants or animals sampled. Based on the current use of the Salmon Site, the following remedial actions were identified to protect both human health and the environment: (1) the

  11. Salmon Site Remedial Investigation Report, Exhibit 2

    Energy Technology Data Exchange (ETDEWEB)

    USDOE NV

    1999-09-01

    This Salmon Site Remedial Investigation Report provides the results of activities initiated by the U.S. Department of Energy (DOE) to determine if contamination at the Salmon Site poses a current or future risk to human health and the environment. These results were used to develop and evaluate a range of risk-based remedial alternatives. Located in Lamar County, Mississippi, the Salmon Site was used by the U.S. Atomic Energy Commission (predecessor to the DOE) between 1964 and 1970 for two nuclear and two gas explosions conducted deep underground in a salt dome. The testing resulted in the release of radionuclides into the salt dome. During reentry drilling and other site activities, liquid and solid wastes containing radioactivity were generated resulting in surface soil and groundwater contamination. Most of the waste and contaminated soil and water were disposed of in 1993 during site restoration either in the cavities left by the tests or in an injection well. Other radioactive wastes were transported to the Nevada Test Site for disposal. Nonradioactive wastes were disposed of in pits at the site and capped with clean soil and graded. The preliminary investigation showed residual contamination in the Surface Ground Zero mud pits below the water table. Remedial investigations results concluded the contaminant concentrations detected present no significant risk to existing and/or future land users, if surface institutional controls and subsurface restrictions are maintained. Recent sampling results determined no significant contamination in the surface or shallow subsurface. The test cavity resulting from the experiments is contaminated and cannot be economically remediated with existing technologies. The ecological sampling did not detect biological uptake of contaminants in the plants or animals sampled. Based on the current use of the Salmon Site, the following remedial actions were identified to protect both human health and the environment: (1) the

  12. Salmon Site Remedial Investigation Report, Exhibit 5

    Energy Technology Data Exchange (ETDEWEB)

    USDOE/NV

    1999-09-01

    This Salmon Site Remedial Investigation Report provides the results of activities initiated by the U.S. Department of Energy (DOE) to determine if contamination at the Salmon Site poses a current or future risk to human health and the environment. These results were used to develop and evaluate a range of risk-based remedial alternatives. Located in Lamar County, Mississippi, the Salmon Site was used by the U.S. Atomic Energy Commission (predecessor to the DOE) between 1964 and 1970 for two nuclear and two gas explosions conducted deep underground in a salt dome. The testing resulted in the release of radionuclides into the salt dome. During reentry drilling and other site activities, liquid and solid wastes containing radioactivity were generated resulting in surface soil and groundwater contamination. Most of the waste and contaminated soil and water were disposed of in 1993 during site restoration either in the cavities left by the tests or in an injection well. Other radioactive wastes were transported to the Nevada Test Site for disposal. Nonradioactive wastes were disposed of in pits at the site and capped with clean soil and graded. The preliminary investigation showed residual contamination in the Surface Ground Zero mud pits below the water table. Remedial investigations results concluded the contaminant concentrations detected present no significant risk to existing and/or future land users, if surface institutional controls and subsurface restrictions are maintained. Recent sampling results determined no significant contamination in the surface or shallow subsurface. The test cavity resulting from the experiments is contaminated and cannot be economically remediated with existing technologies. The ecological sampling did not detect biological uptake of contaminants in the plants or animals sampled. Based on the current use of the Salmon Site, the following remedial actions were identified to protect both human health and the environment: (1) the

  13. Salmon Site Remedial Investigation Report, Appendix C

    Energy Technology Data Exchange (ETDEWEB)

    US DOE/NV

    1999-09-01

    This Salmon Site Remedial Investigation Report provides the results of activities initiated by the U.S. Department of Energy (DOE) to determine if contamination at the Salmon Site poses a current or future risk to human health and the environment. These results were used to develop and evaluate a range of risk-based remedial alternatives. Located in Lamar County, Mississippi, the Salmon Site was used by the U.S. Atomic Energy Commission (predecessor to the DOE) between 1964 and 1970 for two nuclear and two gas explosions conducted deep underground in a salt dome. The testing resulted in the release of radionuclides into the salt dome. During reentry drilling and other site activities, liquid and solid wastes containing radioactivity were generated resulting in surface soil and groundwater contamination. Most of the waste and contaminated soil and water were disposed of in 1993 during site restoration either in the cavities left by the tests or in an injection well. Other radioactive wastes were transported to the Nevada Test Site for disposal. Nonradioactive wastes were disposed of in pits at the site and capped with clean soil and graded. The preliminary investigation showed residual contamination in the Surface Ground Zero mud pits below the water table. Remedial investigations results concluded the contaminant concentrations detected present no significant risk to existing and/or future land users, if surface institutional controls and subsurface restrictions are maintained. Recent sampling results determined no significant contamination in the surface or shallow subsurface. The test cavity resulting from the experiments is contaminated and cannot be economically remediated with existing technologies. The ecological sampling did not detect biological uptake of contaminants in the plants or animals sampled. Based on the current use of the Salmon Site, the following remedial actions were identified to protect both human health and the environment: (1) the

  14. Salmon Site Remedial Investigation Report, Exhibit 2

    International Nuclear Information System (INIS)

    1999-01-01

    This Salmon Site Remedial Investigation Report provides the results of activities initiated by the U.S. Department of Energy (DOE) to determine if contamination at the Salmon Site poses a current or future risk to human health and the environment. These results were used to develop and evaluate a range of risk-based remedial alternatives. Located in Lamar County, Mississippi, the Salmon Site was used by the U.S. Atomic Energy Commission (predecessor to the DOE) between 1964 and 1970 for two nuclear and two gas explosions conducted deep underground in a salt dome. The testing resulted in the release of radionuclides into the salt dome. During reentry drilling and other site activities, liquid and solid wastes containing radioactivity were generated resulting in surface soil and groundwater contamination. Most of the waste and contaminated soil and water were disposed of in 1993 during site restoration either in the cavities left by the tests or in an injection well. Other radioactive wastes were transported to the Nevada Test Site for disposal. Nonradioactive wastes were disposed of in pits at the site and capped with clean soil and graded. The preliminary investigation showed residual contamination in the Surface Ground Zero mud pits below the water table. Remedial investigations results concluded the contaminant concentrations detected present no significant risk to existing and/or future land users, if surface institutional controls and subsurface restrictions are maintained. Recent sampling results determined no significant contamination in the surface or shallow subsurface. The test cavity resulting from the experiments is contaminated and cannot be economically remediated with existing technologies. The ecological sampling did not detect biological uptake of contaminants in the plants or animals sampled. Based on the current use of the Salmon Site, the following remedial actions were identified to protect both human health and the environment: (1) the

  15. Salmon Site Remedial Investigation Report, Main Body

    Energy Technology Data Exchange (ETDEWEB)

    US DOE/NV

    1999-09-01

    This Salmon Site Remedial Investigation Report provides the results of activities initiated by the U.S. Department of Energy (DOE) to determine if contamination at the Salmon Site poses a current or future risk to human health and the environment. These results were used to develop and evaluate a range of risk-based remedial alternatives. Located in Lamar County, Mississippi, the Salmon Site was used by the U.S. Atomic Energy Commission (predecessor to the DOE) between 1964 and 1970 for two nuclear and two gas explosions conducted deep underground in a salt dome. The testing resulted in the release of radionuclides into the salt dome. During reentry drilling and other site activities, liquid and solid wastes containing radioactivity were generated resulting in surface soil and groundwater contamination. Most of the waste and contaminated soil and water were disposed of in 1993 during site restoration either in the cavities left by the tests or in an injection well. Other radioactive wastes were transported to the Nevada Test Site for disposal. Nonradioactive wastes were disposed of in pits at the site and capped with clean soil and graded. The preliminary investigation showed residual contamination in the Surface Ground Zero mud pits below the water table. Remedial investigations results concluded the contaminant concentrations detected present no significant risk to existing and/or future land users, if surface institutional controls and subsurface restrictions are maintained. Recent sampling results determined no significant contamination in the surface or shallow subsurface. The test cavity resulting from the experiments is contaminated and cannot be economically remediated with existing technologies. The ecological sampling did not detect biological uptake of contaminants in the plants or animals sampled. Based on the current use of the Salmon Site, the following remedial actions were identified to protect both human health and the environment: (1) the

  16. Salmon Site Remedial Investigation Report, Exhibit 5

    International Nuclear Information System (INIS)

    1999-01-01

    This Salmon Site Remedial Investigation Report provides the results of activities initiated by the U.S. Department of Energy (DOE) to determine if contamination at the Salmon Site poses a current or future risk to human health and the environment. These results were used to develop and evaluate a range of risk-based remedial alternatives. Located in Lamar County, Mississippi, the Salmon Site was used by the U.S. Atomic Energy Commission (predecessor to the DOE) between 1964 and 1970 for two nuclear and two gas explosions conducted deep underground in a salt dome. The testing resulted in the release of radionuclides into the salt dome. During reentry drilling and other site activities, liquid and solid wastes containing radioactivity were generated resulting in surface soil and groundwater contamination. Most of the waste and contaminated soil and water were disposed of in 1993 during site restoration either in the cavities left by the tests or in an injection well. Other radioactive wastes were transported to the Nevada Test Site for disposal. Nonradioactive wastes were disposed of in pits at the site and capped with clean soil and graded. The preliminary investigation showed residual contamination in the Surface Ground Zero mud pits below the water table. Remedial investigations results concluded the contaminant concentrations detected present no significant risk to existing and/or future land users, if surface institutional controls and subsurface restrictions are maintained. Recent sampling results determined no significant contamination in the surface or shallow subsurface. The test cavity resulting from the experiments is contaminated and cannot be economically remediated with existing technologies. The ecological sampling did not detect biological uptake of contaminants in the plants or animals sampled. Based on the current use of the Salmon Site, the following remedial actions were identified to protect both human health and the environment: (1) the

  17. Strategic considerations for the sustainable remediation of nuclear installations.

    Science.gov (United States)

    Mobbs, S; Orr, P; Weber, I

    2017-08-05

    Nuclear sites around the world are being decommissioned and remedial actions are being undertaken to enable the sites or parts of the sites to be reused. Although this is relatively straightforward for most sites, experience has suggested that preventative action is needed to minimise the impact of remediation activities on the environment and the potential burden to future generations. Removing all contamination in order to make a site suitable for any use generates waste and has associated environmental, social and economic detriments and benefits that should be taken into account. Recent experience of OECD Nuclear Energy Agency (NEA) member countries in the remediation of contaminated land, predominantly contaminated soil and groundwater, on nuclear sites during decommissioning has been assessed by an NEA task group. The experience was used to identify strategic considerations for nuclear site remediation, to consider the application of sustainability principles to nuclear site remediation, to describe good practice, and to make recommendations for further research and development. The key aspects that were identified were that 1) site remediation should be sustainable by resulting in an overall net benefit; and 2) an adaptive approach is essential in order to take into account the inherent uncertainty associated with the decommissioning and site remediation timescales. A report describing the findings was published by OECD/NEA in 2016. The conclusions provide insights to decision makers, regulators, implementers and stakeholders involved in nuclear site decommissioning so that they can achieve sustainable remediation of nuclear sites, now and in the future. Copyright © 2017 Elsevier Ltd. All rights reserved.

  18. Nanotechnology for Site Remediation: Fact Sheet

    Science.gov (United States)

    This fact sheet presents a snapshot of nanotechnology and its current uses in remediation. It presents information to help site project managers understand the potential applications of this group of technologies at their sites.

  19. Strategic Considerations for the Sustainable Remediation of Nuclear Installations

    International Nuclear Information System (INIS)

    Miller, Susan; Wilson, Ian; Decung, Fabien; Ollivier Dehaye, Catherine; Pellenz, Gilles; Palut-Laurent, Odile; Nitzsche, Olaf; Rehs, Bernd; Altavilla, Massimo; Osimani, Celso; Florya, Sergey; Revilla, Jose-Luis; Efraimsson, Henrik; Baines, Kim; Clark, Anna; Cruickshank, Julian; Mitchell, Nick; Mobbs, Shelly; Orr, Peter; Abu-Eid, Rateb Boby; Durham, Lisa; Morse, John; Walker, Stuart; Weber, Inge; ); Monken-Fernandes, Horst; )

    2016-01-01

    Nuclear sites around the world are being decommissioned and remedial actions are being undertaken to enable sites, or parts of sites, to be reused. Although such activities are relatively straightforward for most sites, experience has suggested that preventative action is needed to minimise the impact of remediation activities on the environment and the potential burden to future generations. Removing all contamination in order to make a site suitable for any use generates waste and has associated environmental, social and economic drawbacks and benefits. Site remediation should thus be sustainable and result in an overall net benefit. This report draws on recent experience of NEA member countries in nuclear site remediation during decommissioning in order to identify strategic considerations for the sustainable remediation of subsurface contamination - predominantly contaminated soil and groundwater - to describe good practice, and to make recommendations for further research and development. It provides insights for the decision makers, regulators, implementers and stakeholders involved in nuclear site decommissioning so as to ensure the sustainable remediation of nuclear sites, now and in the future. (authors)

  20. Remedial action plan for the inactive uranium processing site at Naturita, Colorado. DOE responses to comments from U.S. Nuclear Regulatory Commission and Colorado Department of Public Health and Environment

    International Nuclear Information System (INIS)

    1998-01-01

    This report contains responses by the US Department of Energy to comments from the US Nuclear Regulatory Commission and the Colorado Department of Public Health and Environment on the Naturita remedial action plan. This was done in an attempt to clarify information. The site is an inactive uranium processing site at Naturita, Colorado

  1. Remediation of the Maxey Flats Site

    International Nuclear Information System (INIS)

    1990-01-01

    This report describes issues associated with remedial action of Maxey Flats, a low-level radioactive waste disposal site from 1963-1977, located in Fleming County, Kentucky. Present remedial action alternatives being considered are discussed along with emergency plans, ground water monitoring plans, and budgets

  2. Site characterisation and monitoring for environmental remediation

    International Nuclear Information System (INIS)

    Adsley, Ian; Davies, Michael; Murley, Robert; Pearman, Ian; Harman, Nicholas; Proctor, Lorna; Armitage, Jack; Beddow, Helen

    2007-01-01

    Available in abstract form only. Full text of publication follows: Radioactive contamination of nuclear and mineral processing sites can be very varied. Early work in the extraction of uranium and thorium led to the disposal of large amounts of waste containing a variety of daughter radioisotopes. Later, the development of nuclear weapon programs led to large scale processing of uranium and thorium ores, physical separation of isotopes, and the initiation of nuclear fission with the resulting production of fission product radionuclides and activated metals. Weapons testing and reprocessing of reactor fuel again led to the release of fission and activation products, together with radioelements from the chemistry of fuel extraction. Finally the recovery of oil and gas reserves have once again led to renewed interest in NORM (naturally occurring radioactive materials) in the form of Pb-210/Po-210 scales in gas pipelines and Ra-226/Ra-228 in oil pipelines. Methods of monitoring for the contamination generated from all of these processes are considered together with recommended monitoring options for contamination products using gamma, beta and alpha measuring techniques. Specific examples of several site characterisation and monitoring projects are given - covering site investigation through to in-situ and on-site monitoring during the actual remediation. Many of the projects described are of a large scale, typically involving many thousands of tons of waste material. The rapid identification and sentencing into the relevant waste categories is essential in support of on-site civil engineering processes. Consideration of tailoring the monitoring process to achieve such high throughput rates is given. (authors)

  3. Integrated approach to planning the remediation of sites undergoing decommissioning

    International Nuclear Information System (INIS)

    2009-01-01

    Responding to the needs of Member States, the IAEA has launched an environmental remediation guidance initiative dealing with the issues of radioactive contamination world wide. Its aim is to collate and disseminate information concerning the key issues affecting environmental remediation of contaminated sites. This IAEA initiative includes the development of documents that report on remediation technologies available, best practices, and information and guidance concerning (a) Strategy development for environmental remediation; (b) Characterization and remediation of contaminated sites and contaminated groundwater; (c) Management of waste and residues from mining and milling of uranium and thorium; (d) Decommissioning of buildings; (e) A database for contaminated sites. The subject of this present report concerns the integration of decommissioning and remediation activities at sites undergoing decommissioning and this fits within the first category of guidance documentation (strategy development). This document addresses key strategic planning issues. It is intended to provide practical advice and complement other reports that focus on decommissioning and remediation at nuclear facilities. The document is designed to encourage site remediation activities that take advantage of synergies with decommissioning in order to reduce the duplication of effort by various parties and minimize adverse impacts on human health, the environment, and costs through the transfer of experience and knowledge. To achieve this objective, the document is designed to help Member States gain perspective by summarizing available information about synergies between decommissioning and remediation, strategic planning and project management and planning tools and techniques to support decision making and remediation. Case studies are also presented as to give concrete examples of the theoretical elements elaborated in the documents. This publication investigates the potential synergies

  4. The Follow-up IAEA International Mission on Remediation of Large Contaminated Areas Off-Site the Fukushima Daiichi Nuclear Power Plant, Tokyo and Fukushima Prefecture, Japan, 14-21 October 2013. Final Report

    International Nuclear Information System (INIS)

    2014-01-01

    In October 2011, the IAEA conducted an International Mission to Japan to support the remediation of large contaminated areas off-site TEPCO's Fukushima Daiichi Nuclear Power Plant (NPP). In response to the request made by the Government of Japan, in October 2013, the IAEA organized a follow-up International Mission on remediation of large contaminated areas off-site TEPCO's Fukushima Daiichi NPP (hereinafter referred to as the 'Follow-up Mission' or the 'Mission') with the main purpose of evaluating the progress of the on-going remediation works achieved since the previous mission in October 2011. The Follow-up Mission Team involved 13 international experts. Additionally, 3 experts of the Working Group 5 (Subgroup 5.2, Remediation) in charge of preparing the IAEA Report on TEPCO Fukushima Daiichi Accident accompanied the Mission as observers to obtain first-hand information for the report. The Follow-up Mission had the following three objectives: 1. To provide assistance to Japan in assessing the progress made with the remediation of the Special Decontamination Area (not included in the previous mission of 2011) and the Intensive Contamination Survey Areas; 2. To review remediation strategies, plans and works, in view of the advice provided by the previous mission on remediation of large contaminated off-site areas; and 3. To share its findings with the international community as lessons learned. The Mission was conducted through the assessment of information provided to the Team and by means of professional and open discussions with the relevant institutions in Japan, including national, prefectural and local institutions. The Japanese authorities provided comprehensive information on their remediation programme. The Mission Team visited the affected areas, including several sites where activities on remediation were conducted. The Team also visited some temporary storage sites for radioactive waste and soil generated in the remediation activities, as well as a

  5. Technologies for remediation of radioactively contaminated sites

    International Nuclear Information System (INIS)

    1999-06-01

    This report presents particulars on environmental restoration technologies (control and treatment) which can be applied to land based, radioactively contaminated sites. The media considered include soils, groundwater, surface water, sediments, air, and terrestrial and aquatic vegetation. The technologies addressed in this report can be categorized as follows: self-attenuation (natural restoration); in-situ treatment; removal of contamination; ex-situ treatment; and transportation and final disposal. The report provides also background information about and a general approach to remediation of radioactively contaminated sites as well as some guidance for the selection of a preferred remediation technology. Examples of remediation experience in Australia and Canada are given it annexes

  6. Technologies for remediation of radioactively contaminated sites

    Energy Technology Data Exchange (ETDEWEB)

    1999-06-01

    This report presents particulars on environmental restoration technologies (control and treatment) which can be applied to land based, radioactively contaminated sites. The media considered include soils, groundwater, surface water, sediments, air, and terrestrial and aquatic vegetation. The technologies addressed in this report can be categorized as follows: self-attenuation (natural restoration); in-situ treatment; removal of contamination; ex-situ treatment; and transportation and final disposal. The report provides also background information about and a general approach to remediation of radioactively contaminated sites as well as some guidance for the selection of a preferred remediation technology. Examples of remediation experience in Australia and Canada are given it annexes Refs, figs, tabs

  7. Applications of Ecological Engineering Remedies for Uranium Processing Sites, USA

    Energy Technology Data Exchange (ETDEWEB)

    Waugh, William [Navarro Research and Engineering

    2016-05-23

    The U.S. Department of Energy (USDOE) is responsible for remediation of environmental contamination and long-term stewardship of sites associated with the legacy of nuclear weapons production during the Cold War in the United States. Protection of human health and the environment will be required for hundreds or even thousands of years at many legacy sites. USDOE continually evaluates and applies advances in science and technology to improve the effectiveness and sustainability of surface and groundwater remedies (USDOE 2011). This paper is a synopsis of ecological engineering applications that USDOE is evaluating to assess the effectiveness of remedies at former uranium processing sites in the southwestern United States. Ecological engineering remedies are predicated on the concept that natural ecological processes at legacy sites, once understood, can be beneficially enhanced or manipulated. Advances in tools for characterizing key processes and for monitoring remedy performance are demonstrating potential. We present test cases for four ecological engineering remedies that may be candidates for international applications.

  8. Technologies to remediate hazardous waste sites

    International Nuclear Information System (INIS)

    Falco, J.W.

    1990-03-01

    Technologies to remediate hazardous wastes must be matched with the properties of the hazardous materials to be treated, the environment in which the wastes are imbedded, and the desired extent of remediation. Many promising technologies are being developed, including biological treatment, immobilization techniques, and in situ methods. Many of these new technologies are being applied to remediate sites. The management and disposal of hazardous wastes is changing because of federal and state legislation as well as public concern. Future waste management systems will emphasize the substitution of alternatives for the use of hazardous materials and process waste recycling. Onsite treatment will also become more frequently adopted. 5 refs., 7 figs

  9. Waste minimization applications at a remediation site

    International Nuclear Information System (INIS)

    Allmon, L.A.

    1995-01-01

    The Fernald Environmental Management Project (FEMP) owned by the Department of Energy was used for the processing of uranium. In 1989 Fernald suspended production of uranium metals and was placed on the National Priorities List (NPL). The site's mission has changed from one of production to environmental restoration. Many groups necessary for producing a product were deemed irrelevant for remediation work, including Waste Minimization. Waste Minimization does not readily appear to be applicable to remediation work. Environmental remediation is designed to correct adverse impacts to the environment from past operations and generates significant amounts of waste requiring management. The premise of pollution prevention is to avoid waste generation, thus remediation is in direct conflict with this premise. Although greater amounts of waste will be generated during environmental remediation, treatment capacities are not always available and disposal is becoming more difficult and costly. This creates the need for pollution prevention and waste minimization. Applying waste minimization principles at a remediation site is an enormous challenge. If the remediation site is also radiologically contaminated it is even a bigger challenge. Innovative techniques and ideas must be utilized to achieve reductions in the amount of waste that must be managed or dispositioned. At Fernald the waste minimization paradigm was shifted from focusing efforts on source reduction to focusing efforts on recycle/reuse by inverting the EPA waste management hierarchy. A fundamental difference at remediation sites is that source reduction has limited applicability to legacy wastes but can be applied successfully on secondary waste generation. The bulk of measurable waste reduction will be achieved by the recycle/reuse of primary wastes and by segregation and decontamination of secondary wastestreams. Each effort must be measured in terms of being economically and ecologically beneficial

  10. Hanford Site Tank Waste Remediation System

    International Nuclear Information System (INIS)

    1993-05-01

    The US Department of Energy's (DOE) Hanford Site in southeastern Washington State has the most diverse and largest amount of highly radioactive waste of any site in the US. High-level radioactive waste has been stored in large underground tanks since 1944. A Tank Waste Remediation System Program has been established within the DOE to safely manage and immobilize these wastes in anticipation of permanent disposal in a geologic repository. The Hanford Site Tank Waste Remediation System Waste Management 1993 Symposium Papers and Viewgraphs covered the following topics: Hanford Site Tank Waste Remediation System Overview; Tank Waste Retrieval Issues and Options for their Resolution; Tank Waste Pretreatment - Issues, Alternatives and Strategies for Resolution; Low-Level Waste Disposal - Grout Issue and Alternative Waste Form Technology; A Strategy for Resolving High-Priority Hanford Site Radioactive Waste Storage Tank Safety Issues; Tank Waste Chemistry - A New Understanding of Waste Aging; Recent Results from Characterization of Ferrocyanide Wastes at the Hanford Site; Resolving the Safety Issue for Radioactive Waste Tanks with High Organic Content; Technology to Support Hanford Site Tank Waste Remediation System Objectives

  11. Remediation of sites with dispersed radioactive contamination

    International Nuclear Information System (INIS)

    2004-01-01

    To respond to the needs of Member States, the IAEA launched an environmental remediation project to deal with the problems of radioactive contamination worldwide. The IAEA environmental remediation project includes an IAEA Coordinated Research Project, as well as the participation of IAEA experts in concrete remediation projects when requested by individual Member States. The IAEA has prepared several documents dedicated to particular technical or conceptual areas, including documents on the characterization of contaminated sites, technical and non-technical factors relevant to the selection of a preferred remediation strategy and technique, overview of applicable techniques for environmental remediation,, options for the cleanup of contaminated groundwater and planning and management issues. In addition, a number of other IAEA publications dealing with related aspects have been compiled under different IAEA projects; these include TECDOCs on the remediation of uranium mill tailings, the decontamination of buildings and roads and the characterization of decommissioned sites. Detailed procedures for the planning and implementation of remedial measures have been developed over the past decade or so. A critical element is the characterization of the contamination and of the various environmental compartments in which it is found, in order to be able to evaluate the applicability of remediation techniques. The chemical or mineralogical form of the contaminant will critically influence the efficiency of the remediation technique chosen. Careful delineation of the contamination will ensure that only those areas or volumes of material that are actually contaminated are treated. This, in turn, reduces the amount of any secondary waste generated. The application of a remediation technique requires holistic studies examining the technical feasibility of the proposed measures, including analyses of their impact. Consequently, input from various scientific and engineering

  12. Natural Remediation at Savannah River Site

    International Nuclear Information System (INIS)

    Lewis, C. M.; Van Pelt, R.

    2002-01-01

    Natural remediation is a general term that includes any technology or strategy that takes advantage of natural processes to remediate a contaminated media to a condition that is protective of human health and the environment. Natural remediation techniques are often passive and minimally disruptive to the environment. They are generally implemented in conjunction with traditional remedial solutions for source control (i.e., capping, stabilization, removal, soil vapor extraction, etc.). Natural remediation techniques being employed at Savannah River Site (SRS) include enhanced bio-remediation, monitored natural attenuation, and phytoremediation. Enhanced bio-remediation involves making nutrients available and conditions favorable for microbial growth. With proper precautions and feeding, the naturally existing microbes flourish and consume the contaminants. Case studies of enhanced bio-remediation include surface soils contaminated with PCBs and pesticides, and Volatile Organic Compound (VOC) contamination in both the vadose zone and groundwater. Monitored natural attenuation (MNA) has been selected as the preferred alternative for groundwater clean up at several SRS waste units. Successful implementation of MNA has been based on demonstration that sources have been controlled, groundwater modeling that indicates that plumes will not expand or reach surface water discharge points at levels that exceed regulatory limits, and continued monitoring. Phytoremediation is being successfully utilized at several SRS waste units. Phytoremediation involves using plants and vegetation to uptake, break down, or manage contaminants in groundwater or soils. Case studies at SRS include managing groundwater plumes of tritium and VOCs with pine trees that are native to the area. Significant decreases in tritium discharge to a site stream have been realized in one phytoremediation project. Studies of other vegetation types, methods of application, and other target contaminants are

  13. Passive remediation strategies for petroleum contaminated sites

    International Nuclear Information System (INIS)

    Everett, L.G.; Cullen, S.J.; Eccles, L.A.

    1991-01-01

    The US EPA is becoming increasingly aware of costs and the limited success of existing remediation strategies. Research teams within the US EPA believe that if passive remediation can be successfully demonstrated, it is a candidate for best available technology. Passive remediation, however, must be demonstrated through the use of monitoring techniques, which demonstrate: contaminants are not moving in the dissolved, adsorbed or free product phase; and contamination is biodegrading in-place. This paper presents a concise monitoring and analysis strategy for passive remediation. Specifically, the paper presents the accuracy, precision and operating range of neutron moderation techniques as a low cost, real-time screening tool to measure the migration of the dissolved phase in soil moisture, the stabilized adsorbed phase and free product movement. In addition, the paper identifies the capillary pressure range through which the dissolved phase will move and identifies techniques for satisfying the risk analysis that movement is not taking place. The rationale for passive remediation taking place is confirmed through a discussion of gas ratios associated with bacterial assimilation of hydrocarbons. Gas ratios which are relatively constant above ground are highly inverted in the subsurface at contamination sites. The use of frequent screening of a vertical geologic profile using least cost techniques and the infrequent analysis of soil gas ratios provides the required data upon which the public will accept passive remediation as best available technology at a particular site. The paper points out that neutron moderation is a high candidate vadose zone monitoring device and identifies alternative techniques using resistivity and dielectric constants, which are in the developmental stage. The economic implications for passive remediation are enormous relative to the excavation and remediation strategies which are currently in use

  14. Site remediation using biological processes

    International Nuclear Information System (INIS)

    Lei, J.; Sansregret, J.L.; Cyr, B.; Pouliot, Y.

    1995-01-01

    The main process used in the bioremediation of contaminated sites is the microbial degradation and mineralization of pollutants. The bioengineering processes developed and applied by the company to optimize the microbial degradation are described and full scale case studies are reviewed. In each case, the site characteristics (type of contaminants, nature of soil, geographic location, etc.) and the results obtained are presented. The selected projects cover different bioremediation techniques (biopile, bioventing and air sparging), different contaminants (PAH, PCP, hydrocarbons) and different types of industrial sites (former gas work plant, petroleum depot, refinery, etc.)

  15. Groundwater remediation at the Hanford site

    International Nuclear Information System (INIS)

    Fries, W.

    1993-01-01

    Ion exchange resin and adsorption technology has been used successfully to treat diversified types of toxic waste water for many years. Even though the Hanford Site presents many unique problems, the author believes these technologies can remediate the groundwater at this site. However, treatment of the sludge in tanks generally is beyond the pale of these technologies except for the possibility of experimental studies being performed at the University of Idaho (Troescher)

  16. Pyramid mountain diesel fuel storage site remediation

    Energy Technology Data Exchange (ETDEWEB)

    Brolmsa, M.; Sandau, C. [Jacques Whitford Environment Ltd., Burnaby, BC (Canada)

    2005-07-01

    Remediation activities during the decommissioning of a microwave tower facility where a tram line was used to transfer diesel fuel from the base of a mountain to its summit were described. As the site was leased from Parks Canada, federal guidelines were used to assess levels of contamination. Underground storage tanks (USTs) used for diesel storage had been replaced with aboveground storage tanks (AST) in 1994. Remediation was also complicated by the remote location and altitude of the site, as well as by extreme weather conditions. Hand auguring and test pitting were used at both the summit and base to allow characterization and preliminary delineation of impacted soils. A heavy lift helicopter was used to place demolition and excavation equipment on the summit. An excavator was used to remove hydrocarbon impacted soils. Following the remedial excavation for the summit diesel AST, residual soil impacts in excess of the applicable remediation guidelines were present at the bottom of the tank nest and under a floor slab. An environmental liner was installed, and a quantitative screening level risk assessment demonstrated the low level of risk for the area, as well as for waste oil impacted soils on the slope below the summit. Contaminants of potential concern were barium, zinc, naphthalene, and petroleum hydrocarbon fractions F1-F4. It was concluded that there are now no unacceptable ecological or human risks from residual impacts at the site. 1 tab., 19 figs.

  17. Remediation of legacy sites in Belarus

    International Nuclear Information System (INIS)

    Shiryaeva, Nina; Skurat, Vladimir; Zhemzhurov, Michail; Myshkina, Nadezhda; Chaternik, Romouald; Yacko, Svetlana

    2008-01-01

    Full text: In Belarus there are several kinds several types of radioactive waste repositories, which present the different legacy sites, namely: 1-) Decontamination wastes of the Chernobyl origin from decontaminating the territory of Belarus after the Chernobyl nuclear power plant accident. Decontamination wastes (DW) are placed in repositories of near surface type with engineered barriers and without them; 2-) Disused radioactive sources, that were found in the territories of the former military bases disbanded in Belarus after disintegration of the Soviet Union. These wastes have been stored in the concrete wells in different places of Belarus. Decontamination wastes of the Chernobyl origin are a great problem for Belarus. They result from decontaminating the territory of Belarus from radioactive fall-outs after the Chernobyl nuclear power plant (NPP) accident. Decontamination wastes were placed in more than 90 repositories near 78 settlements. Their disposal sites were mainly chosen without detail account of hydrogeological conditions. Therefore the most of them are of potential hazard because of possible secondary radioactive contamination of the ecosystems. At the moment in accordance with the State Program of Republic of Belarus to mitigate and overcome the consequences of the Chernobyl NPP accident the necessary measures on the guaranteeing of decontamination waste storage reliability have been performed, such as compacting of DW disposal sites; upper isolation of DW with the protected one or two layers clay layer of 0.5 m thickness and soil layer from near territory of 1.0 m thickness; turfing of disposal site territory by sowing grasses. At present works are being continued on decontamination of residential properties, and also dismantling and burying of contaminated industrial equipment. For these purposes and also for control and maintenance of these legacy sites Belarus allocates 1.6 million dollars annually. After disbanding the military divisions of

  18. Environmental remediation. Strategies and techniques for cleaning radioactively contaminated sites

    International Nuclear Information System (INIS)

    Falck, W. Eberhard

    2001-01-01

    Actions for a cleaner and safety environment have risen on social and political agendas in recent years. They include efforts to remediate contaminated sites posing a radiological risk to humans and the surrounding environment. Radiological risks can result from a variety of nuclear and non-nuclear activities. They include: nuclear or radiological accidents; nuclear weapons production and testing; poor radioactive waste management and disposal practices; industrial manufacturing involving radioactive materials; conventional mining and milling of ores and other production processes, e.g. oil and gas production, resulting in enhanced concentrations of naturally occurring radioactive materials (NORMs). The IAEA has developed a comprehensive programme directed at the remediation of radioactively contaminated sites. The programme collates and distributes knowledge about contaminated sites; appropriate methods for their characterization; assessment of their potential environmental and radiological impact; and applicable methods for their clean-up, following internationally recommended safety criteria. The overall resources, and which are technologically less advanced, to focus their efforts and chose appropriate strategies for the abatement or removal of exposure to radiation. An important aspect is the intention to 'close the loop' in the nuclear fuel cycle in the interests of sustainable energy development including nuclear power

  19. Soil sorting, new approach to site remediation management

    International Nuclear Information System (INIS)

    Bramlitt, E.T.; Woods, J.A.; Dillon, M.J.

    1996-01-01

    Soil sorting is the technology which conveys soil beneath contaminant detectors and, based on contaminant signal, automatically toggles a gate at the conveyor end to send soil with contamination above a guideline to a separate location from soil which meets the guideline. The technology was perfected for remediation of sites having soils with radioactive contamination, but it is applicable to other contaminants when instrumental methods exist for rapid contaminant detection at levels of concern. This paper examines the three methods for quantifying contamination in soil in support of site remediation management. Examples are discussed where the primary contaminant is plutonium, a radioactive substance and source of nuclear energy which can be hazardous to health when in the environment without controls. Field survey instruments are very sensitive to plutonium and can detect it in soil at levels below a part per billion, and there are a variety of soils which have been contaminated by plutonium and thoroughly investigated. The lessons learned with plutonium are applicable to other types of contaminants and site remediations. The paper concludes that soil sorting can be the most cost effective approach to site remediation, and it leads to the best overall cleanup

  20. Specialized sorting and measuring system for site remediation

    International Nuclear Information System (INIS)

    Runge, H.; Christ, G.

    2001-01-01

    The machine design and measurement philosophy of the SSGE, developed for excavation and treatment of some 21,000 metric tons of ground material and concrete from NUKEM decommissioned fuel element factory, have already been passed the official licensing procedure. The start up of site clean-up is scheduled for summer 2001. With the SSGE there has been made available a method to safe and economically remediate contaminated ground of nuclear sites. The SSEG, being a mobile system, can be applied at various sites

  1. Methodology to remediate a mixed waste site

    Energy Technology Data Exchange (ETDEWEB)

    Berry, J.B.

    1994-08-01

    In response to the need for a comprehensive and consistent approach to the complex issue of mixed waste management, a generalized methodology for remediation of a mixed waste site has been developed. The methodology is based on requirements set forth in the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and the Resource Conservation and Recovery Act (RCRA) and incorporates ``lessons learned`` from process design, remediation methodologies, and remediation projects. The methodology is applied to the treatment of 32,000 drums of mixed waste sludge at the Oak Ridge K-25 Site. Process technology options are developed and evaluated, first with regard to meeting system requirements and then with regard to CERCLA performance criteria. The following process technology options are investigated: (1) no action, (2) separation of hazardous and radioactive species, (3) dewatering, (4) drying, and (5) solidification/stabilization. The first two options were eliminated from detailed consideration because they did not meet the system requirements. A quantitative evaluation clearly showed that, based on system constraints and project objectives, either dewatering or drying the mixed waste sludge was superior to the solidification/stabilization process option. The ultimate choice between the drying and the dewatering options will be made on the basis of a technical evaluation of the relative merits of proposals submitted by potential subcontractors.

  2. Methodology to remediate a mixed waste site

    International Nuclear Information System (INIS)

    Berry, J.B.

    1994-08-01

    In response to the need for a comprehensive and consistent approach to the complex issue of mixed waste management, a generalized methodology for remediation of a mixed waste site has been developed. The methodology is based on requirements set forth in the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and the Resource Conservation and Recovery Act (RCRA) and incorporates ''lessons learned'' from process design, remediation methodologies, and remediation projects. The methodology is applied to the treatment of 32,000 drums of mixed waste sludge at the Oak Ridge K-25 Site. Process technology options are developed and evaluated, first with regard to meeting system requirements and then with regard to CERCLA performance criteria. The following process technology options are investigated: (1) no action, (2) separation of hazardous and radioactive species, (3) dewatering, (4) drying, and (5) solidification/stabilization. The first two options were eliminated from detailed consideration because they did not meet the system requirements. A quantitative evaluation clearly showed that, based on system constraints and project objectives, either dewatering or drying the mixed waste sludge was superior to the solidification/stabilization process option. The ultimate choice between the drying and the dewatering options will be made on the basis of a technical evaluation of the relative merits of proposals submitted by potential subcontractors

  3. Remediating sites contaminated with heavy metals

    International Nuclear Information System (INIS)

    Swartzbaugh, J.; Sturgill, J.; Cormier, B.; Williams, H.D.

    1992-01-01

    This article is intended to serve as a reference for decision makers who must choose an approach to remediate sites contaminated with heavy metals. Its purpose is to explain pertinent chemical and physical characteristics of heavy metals, how to use these characteristics to select remedial technologies, and how to interpret and use data from field investigations. Different metal species are typically associated with different industrial processes. The contaminant species behave differently in various media (i.e., groundwater, soils, air), and require different technologies for containment and treatment. We focus on the metals that are used in industries that generate regulated waste. These include steelmaking, paint and pigment manufacturing, metal finishing, leather tanning, papermaking, aluminum anodizing, and battery manufacturing. Heavy metals are also present in refinery wastes as well as in smelting wastes and drilling muds

  4. Salmon Site Remedial Investigation Report, Appendix B (Part 2)

    International Nuclear Information System (INIS)

    1999-01-01

    This Salmon Site Remedial Investigation Report provides the results of activities initiated by the U.S. Department of Energy (DOE) to determine if contamination at the Salmon Site poses a current or future risk to human health and the environment. These results were used to develop and evaluate a range of risk-based remedial alternatives. Located in Lamar County, Mississippi, the Salmon Site was used by the U.S. Atomic Energy Commission (predecessor to the DOE) between 1964 and 1970 for two nuclear and two gas explosions conducted deep underground in a salt dome. The testing resulted in the release of radionuclides into the salt dome. During reentry drilling and other site activities, liquid and solid wastes containing radioactivity were generated resulting in surface soil and groundwater contamination. Most of the waste and contaminated soil and water were disposed of in 1993 during site restoration either in the cavities left by the tests or in an injection well. Other radioactive wastes were transported to the Nevada Test Site for disposal. Nonradioactive wastes were disposed of in pits at the site and capped with clean soil and graded. The preliminary investigation showed residual contamination in the Surface Ground Zero mud pits below the water table. Remedial investigations results concluded the contaminant concentrations detected present no significant risk to existing and/or future land users, if surface institutional controls and subsurface restrictions are maintained. Recent sampling results determined no significant contamination in the surface or shallow subsurface. The test cavity resulting from the experiments is contaminated and cannot be economically remediated with existing technologies. The ecological sampling did not detect biological uptake of contaminants in the plants or animals sampled. Based on the current use of the Salmon Site, the following remedial actions were identified to protect both human health and the environment: (1) the

  5. Salmon Site Remedial Investigation Report, Appendix B (Part 1)

    International Nuclear Information System (INIS)

    1999-01-01

    This Salmon Site Remedial Investigation Report provides the results of activities initiated by the U.S. Department of Energy (DOE) to determine if contamination at the Salmon Site poses a current or future risk to human health and the environment. These results were used to develop and evaluate a range of risk-based remedial alternatives. Located in Lamar County, Mississippi, the Salmon Site was used by the U.S. Atomic Energy Commission (predecessor to the DOE) between 1964 and 1970 for two nuclear and two gas explosions conducted deep underground in a salt dome. The testing resulted in the release of radionuclides into the salt dome. During reentry drilling and other site activities, liquid and solid wastes containing radioactivity were generated resulting in surface soil and groundwater contamination. Most of the waste and contaminated soil and water were disposed of in 1993 during site restoration either in the cavities left by the tests or in an injection well. Other radioactive wastes were transported to the Nevada Test Site for disposal. Nonradioactive wastes were disposed of in pits at the site and capped with clean soil and graded. The preliminary investigation showed residual contamination in the Surface Ground Zero mud pits below the water table. Remedial investigations results concluded the contaminant concentrations detected present no significant risk to existing and/or future land users, if surface institutional controls and subsurface restrictions are maintained. Recent sampling results determined no significant contamination in the surface or shallow subsurface. The test cavity resulting from the experiments is contaminated and cannot be economically remediated with existing technologies. The ecological sampling did not detect biological uptake of contaminants in the plants or animals sampled. Based on the current use of the Salmon Site, the following remedial actions were identified to protect both human health and the environment: (1) the

  6. Remediation of Site of Decommissioning Research Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Danilovich, A.S.; Ivanov, O.P.; Lemus, A.V.; Pavlenko, V.I.; Potapov, V.N.; Semenov, S.G.; Shisha, A.D.; Chesnokov, A.V. [National Research Center ' Kurchatov Institute' , 123182, Moscow (Russian Federation)

    2014-07-01

    In the world the most widespread method of soil decontamination consists of removing the contaminated upper layer and sending it for long-term controlled storage. However, implementation of this soil cleanup method for remediation of large contaminated areas would involve high material and financial expenditures, because it produces large amounts of radioactive waste demanding removal to special storage sites. Contaminated soil extraction and cleanup performed right on the spot of remediation activities represents a more advanced and economically acceptable method. Radiological separation of the radioactive soil allows reducing of amount of radwaste. Studies performed during the liquidation of the Chernobyl accident consequences revealed that a considerable fraction of radioactivity is accumulated in minute soil grains. So, the separation of contaminated soil by size fractions makes it possible to extract and concentrate the major share of radioactivity in the fine fraction. Based on these researches water gravity separation technology was proposed by Bochvar Institute. The method extracts the fine fraction from contaminated soil. Studies carried out by Bochvar Institute experts showed that, together with the fine fraction (amounting to 10-20% of the initial soil), this technology can remove up to 85-90% of contaminating radionuclides. The resulting 'dirty' soil fraction could be packaged into containers and removed as radwaste, and decontaminated fractions returned back to their extraction site. Use of radiological and water gravity separations consequently increases the productivity of decontamination facility. Efficiency of this technology applied for contaminated soil cleanup was confirmed in the course of remediation of the contaminated territories near decommissioning research reactor in the Kurchatov Institute. For soil cleaning purposes, a special facility implementing the technology of water gravity separation and radiometric monitoring of soil

  7. Site remediation guided by risk assessment

    International Nuclear Information System (INIS)

    McBean, E.A.; Gowing, A.; Pieczonka, G.

    2002-01-01

    'Full text:' Risk assessment (RA) provides an effective tool for identifying hazards with respect to human health and ecological receptors, hazards that arise from contaminants in the environment. Risk assessment relies upon: hazard identification/problem formulation; toxicity assessment; exposure assessment; and risk characterization. Hence, risk assessment provides an effective guide for site remediation through the identification of the associated risks arising from pre- and potential post-remediation activities. As a demonstration of this decision-making process, a site-specific risk assessment (SSRA) was performed on a chemical producing facility. Historical waste practices during the production of DDT compounds resulted in impacted site soils and sediment and soils of the creek passing through the facility. The purpose of the SSRA was to derive site-specific cleanup values for the impacted on-site soils, creek sediments, and embankment soils, incorporating human and ecological receptors associated with the environmental media. The human exposure pathways considered were dermal contact, incidental ingestion, and inhalation of the various soils. The potential human receptors were industrial workers, construction workers, trespassers, and off-site residents. Ingestion of fish from the creek by residents was also evaluated in the human health risk assessment (HHRA). Food web analyses were used to evaluate the impact of exposure to chemical compounds in aquatic sediments and related soils by ecological receptors such as the great blue heron, raccoon, and mink. The SSRA involved modelling the daily chemical intake by receptors and the transfer of chemicals to identified secondary media (e.g., ambient air or animal tissues) that are also potential exposure media. These models, while using the site-specific chemical data in the source media, possess uncertainties associated with default parameters that are only approximations and not site-specific (e.g., soil

  8. Site characterization techniques used in environmental remediation activities

    International Nuclear Information System (INIS)

    Kostelnik, K.M.

    2000-01-01

    As a result of decades of nuclear energy research, weapons production, as well as ongoing operations, a significant amount of radioactive contamination has occurred throughout the United States Department of Energy (DOE) complex. DOE facility are in the process of assessing and potentially remediating various sites according to the regulations imposed by a Federal Facility Agreement and Consent order (FFA/CO) between DOE, the state in which the facility is located, and the U.S. Environmental Protection Agency (EPA). In support of these active site remediation efforts, the DOE has devoted considerable resources towards the development of innovative site characterization techniques that support environmental restoration activities. These resources and efforts have focused on various aspects of this complex problem. Research and technology development conducted at the Idaho National Engineering and Environmental Laboratory (INEEL) has resulted in the ability and state-of-the-art equipment required to obtain real-time, densely spaced, in situ characterization data (i.e. detection, speciation, and location) of various radionuclides and contaminants. The Remedial Action Monitoring System (RAMS), developed by the INEEL, consists of enhanced sensor technology, measurement modeling and interpretation techniques, and a suite of deployment platforms which can be interchanged to directly support remedial cleanup and site verification operations. In situ characterization techniques have advanced to the point where they are being actively deployed in support of remedial operations. The INEEL has deployed its system at various DOE and international sites. The deployment of in situ characterization systems during environmental restoration operations has shown that this approach results in several significant benefits versus conventional sampling techniques. A flexible characterization system permits rapid modification to satisfy physical site conditions, available site resources

  9. Cost benefit analysis for remediation of a nuclear industry landfill

    International Nuclear Information System (INIS)

    Parker, Tom; Hardisty, Paul; Dennis, Frank; Liddiard, Mark; McClelland, Paul

    2006-01-01

    An old landfill site, licensed to receive inert construction waste, is situated on the top of hard rock cliffs adjacent to the sea at the Dounreay nuclear facility in Scotland. During restoration and investigation work at the landfill, radioactively contaminated material and asbestos was identified. UKAEA subsequently investigated the feasibility of remediating the landfill with the aim of removing any remaining radioactive or otherwise-contaminated material. The cost of landfill remediation would be considerable, making Cost Benefit Analysis (CBA) an ideal tool for assessing remediation options. The overall conclusion of the CBA, from a remedial decision making point of view, is that the remediation objective for the landfill should be to reduce any impacts to the current receptors through a comprehensive pathway control scheme. This would be considerably less expensive than even a limited source removal approach. Aggressive source removal objectives are not likely to be economic, even under the most conservative assumptions. A natural monitored attenuation approach will not be economic. All remediation options are considered assuming compliance with the existing regulatory requirements to monitor and cap the landfill before and after closure

  10. Cost benefit analysis for remediation of a nuclear industry landfill

    Energy Technology Data Exchange (ETDEWEB)

    Parker, Tom; Hardisty, Paul [WorleyParsons Komex, Bristol (United Kingdom); Dennis, Frank; Liddiard, Mark; McClelland, Paul [UKAEA, Dounreay (United Kingdom)

    2006-09-15

    An old landfill site, licensed to receive inert construction waste, is situated on the top of hard rock cliffs adjacent to the sea at the Dounreay nuclear facility in Scotland. During restoration and investigation work at the landfill, radioactively contaminated material and asbestos was identified. UKAEA subsequently investigated the feasibility of remediating the landfill with the aim of removing any remaining radioactive or otherwise-contaminated material. The cost of landfill remediation would be considerable, making Cost Benefit Analysis (CBA) an ideal tool for assessing remediation options. The overall conclusion of the CBA, from a remedial decision making point of view, is that the remediation objective for the landfill should be to reduce any impacts to the current receptors through a comprehensive pathway control scheme. This would be considerably less expensive than even a limited source removal approach. Aggressive source removal objectives are not likely to be economic, even under the most conservative assumptions. A natural monitored attenuation approach will not be economic. All remediation options are considered assuming compliance with the existing regulatory requirements to monitor and cap the landfill before and after closure.

  11. Decision aiding techniques for site remediation

    Energy Technology Data Exchange (ETDEWEB)

    Van de Walle, B

    1996-09-18

    Decision making problems in the nuclear domain are known for their complexity since they usually involve a wide range of technical, social, and political considerations. Site restoration is a typical example of a complex nuclear decision problem, and more and more decision makers realize that they need new tools to assist in the decision making process. This paper reports on multi-criteria decision analysis, a powerful tool for handling complex decisions involving multiple criteria. The motivation to use multi-criteria decision analysis in the domain of site restoration is illustrated. New developments and challenges in this field are addressed.

  12. Decision aiding techniques for site remediation

    International Nuclear Information System (INIS)

    Van de Walle, B.

    1996-01-01

    Decision making problems in the nuclear domain are known for their complexity since they usually involve a wide range of technical, social, and political considerations. Site restoration is a typical example of a complex nuclear decision problem, and more and more decision makers realize that they need new tools to assist in the decision making process. This paper reports on multi-criteria decision analysis, a powerful tool for handling complex decisions involving multiple criteria. The motivation to use multi-criteria decision analysis in the domain of site restoration is illustrated. New developments and challenges in this field are addressed

  13. Characterization of radioactively contaminated sites for remediation purposes

    International Nuclear Information System (INIS)

    1998-05-01

    Characterization of the contaminated site is essential before embarking on a programme for its remediation and ultimate restoration. Reliable and suitable data must be obtained regarding the distribution and physical, chemical and nuclear properties of all radioactive contaminants. Characterization data is necessary for assessing the associated radiation risks and is used in support of the required engineering design and project planning for the environmental restoration. In addition, continuing characterization can provide information regarding efficiency of the cleanup methods and influence possible redirection of work efforts. Similarly, at the end of the remediation phase, characterization and ongoing monitoring can be used to demonstrate completion and success of the cleanup process. The suggested methodology represents a contribution attempting to solve the issue of preremediation characterization in a general manner. However, a number of difficulties might make this methodology unsuitable for general application across the diverse social, environmental and political systems in the IAEA Member States. This TECDOC covers the methodologies used to characterize radioactively contaminated sites for the purpose of remediating the potential sources of radiation exposure and assessing the hazards to human health and the environment

  14. Final audit report of remedial action construction at the UMTRA Project Mexican Hat, Utah -- Monument Valley, Arizona, sites

    International Nuclear Information System (INIS)

    1995-10-01

    The final audit report for remedial action at the Mexican Hat, Utah, Monument Valley, Arizona, Uranium Mill Tailings Remedial Action (UMTRA) Project sites consists of a summary of the radiological surveillances/audits, quality assurance (QA) in-process surveillances, and QA remedial action close-out inspections performed by the US Department of Energy (DOE) and the Technical Assistance Contractor (TAC); on-site construction reviews (OSCR) performed by the US Nuclear Regulatory Commission (NRC); and a surveillance performed by the Navajo Nation. This report refers to remedial action activities performed at the Mexican Hat, Utah--Monument Valley, Arizona, Uranium Mill Tailings Remedial Action (UMTRA) Project sites

  15. Process for determining the remediation category of hazardous substance sites

    International Nuclear Information System (INIS)

    Sieben, A.K.

    1994-01-01

    An evaluation process has been developed that aids in selecting the appropriate remediation category of hazardous substance sites. Three general remediation categories have been established: No further Action: Potential Early Action: and Defer for RI/FS or Transition/Decontamination and Decommissioning. This evaluation method is a preliminary screening process only and will not identify the most appropriate remediation alternative for each site. The remedy selection process can proceed only after a remediation category is determined for each site. All sites are evaluated at a preliminary screening level to determine the general remediation category. After the first screen, a secondary evaluation is performed on both the PEA sites and the DEFER sites. For PEAs, this secondary evaluation will incorporate additional specific factors, such as a screening level risk assessment. For the DEFER sites feasibility factors will be used to distinguish between the sites which should undergo a normal RI/FS and the sites which will be recommended to be remediated in association with D ampersand D of buildings. Ultimately, all of the sites will be placed into one of four remediation categories

  16. Multivariate methods in nuclear waste remediation: Needs and applications

    International Nuclear Information System (INIS)

    Pulsipher, B.A.

    1992-05-01

    The United States Department of Energy (DOE) has developed a strategy for nuclear waste remediation and environmental restoration at several major sites across the country. Nuclear and hazardous wastes are found in underground storage tanks, containment drums, soils, and facilities. Due to the many possible contaminants and complexities of sampling and analysis, multivariate methods are directly applicable. However, effective application of multivariate methods will require greater ability to communicate methods and results to a non-statistician community. Moreover, more flexible multivariate methods may be required to accommodate inherent sampling and analysis limitations. This paper outlines multivariate applications in the context of select DOE environmental restoration activities and identifies several perceived needs

  17. Technology needs and trends for hazardous waste site remediation

    International Nuclear Information System (INIS)

    Kovalick, W.W. Jr.

    1995-01-01

    Over the next few decades, federal, state, and local governments and private industry will commit billions of dollars annually to clean up sites contaminated with hazardous waste and petroleum products. While these needs represent an obligation for society, they also represent an important business opportunity for vendors of remediation services. This presentation assesses the remediation market by characterizing sites that comprise the demand for cleanup services, observing remedy selection trends in the Superfund program, and discussing gaps in the supply of technologies

  18. Nuclear installations sites safety

    International Nuclear Information System (INIS)

    Barber, P.; Candes, P.; Duclos, P.; Doumenc, A.; Faure, J.; Hugon, J.; Mohammadioun, B.

    1988-11-01

    This report is divided into ten parts bearing: 1 Safety analysis procedures for Basis Nuclear Installations sites (BNI) in France 2 Site safety for BNI in France 3 Industrial and transport activities risks for BNI in France 4 Demographic characteristics near BNI sites in France 5 Meteorologic characteristics of BNI sites in France 6 Geological aspects near the BNI sites in France 7 Seismic studies for BNI sites in France 8 Hydrogeological aspects near BNI sites in France 9 Hydrological aspects near BNI sites in France 10 Ecological and radioecological studies of BNI sites in France [fr

  19. Remedial action at the Acid/Pueblo Canyon site, Los Alamos, New Mexico. Final report

    International Nuclear Information System (INIS)

    1984-10-01

    The Acid/Pueblo Canyon site (TA-45) was designated in 1976 for remedial action under the Formerly Utilized Sites Remedial Action Program (FUSRAP). During the period 1943 to 1964 untreated and treated liquid wastes generated by nuclear weapons research activities at the Los Alamos Scientific Laboratory (LASL) were discharged into the two canyons. A survey of the site conducted by LASL in 1976 to 1977 identified two areas where radiological contamination exceeded criteria levels. The selected remedial action was based on extensive radiological characterization and comprehensive engineering assessments and comprised the excavation and disposal of 390 yd 3 of contaminated soil and rock. This document describes the background to the remedial action, the parties involved in administering and executing it, the chronology of the work, verification of the adequacy of the remedial action, and the cost incurred. 14 references, 5 figures, 5 tables

  20. Progress and problems in the Formerly Utilized Sites Remedial Action Program and Surplus Facilities Management Program

    International Nuclear Information System (INIS)

    Fiore, J.J.; Turi, G.P.

    1988-01-01

    The Formerly Utilized Sites Remedial Action Program (FUSRAP) was established in 1974 to identify, evaluate, and as appropriate, conduct remedial actions at sites used in the early years of nuclear energy development by the Manhattan Engineer District and the Atomic Energy Commission (AEC). This program currently has 29 sites and is evaluating 350 other sites for possible inclusion in the program. Another remedial action program in the Department of Energy's (DOE) Division of Facility and Site Decommissioning Projects is the Surplus Facilities Management Program (SFMP). The SFMP involves the safe management, decontamination and disposal of surplus DOE contaminated facilities which were not related to defense activities. There are currently 33 projects at 15 different sites in the program. These two programs have made steady progress over the last 10 or so years in cleaning up sites so that they can be reused or released for unrestricted use. Work has been completed at 8 of the FUSRAP sites and three of the SFMP sites

  1. Petroleum hydrocarbon contaminated sites: a review of investigation and remediation regulations and processes

    Energy Technology Data Exchange (ETDEWEB)

    Epelbaum, Michel; Claudio, Jair R. [Bureau Veritas do Brasil Sociedade Classificadora e Certificadora Ltda., Sao Paulo, SP (Brazil)

    1993-12-31

    This paper discusses alternatives on remediation of petroleum hydrocarbon contaminated sites which include groundwater remediation techniques and soil remediation techniques. Finally, the work points out some trends of sites remediation in Brazil and abroad. 6 refs., 1 fig., 7 tabs.

  2. Petroleum hydrocarbon contaminated sites: a review of investigation and remediation regulations and processes

    Energy Technology Data Exchange (ETDEWEB)

    Epelbaum, Michel; Claudio, Jair R [Bureau Veritas do Brasil Sociedade Classificadora e Certificadora Ltda., Sao Paulo, SP (Brazil)

    1994-12-31

    This paper discusses alternatives on remediation of petroleum hydrocarbon contaminated sites which include groundwater remediation techniques and soil remediation techniques. Finally, the work points out some trends of sites remediation in Brazil and abroad. 6 refs., 1 fig., 7 tabs.

  3. Alternating current electrocoagulation for Superfund site remediation

    International Nuclear Information System (INIS)

    Farrell, C.W.

    1991-01-01

    A study is being conducted by Electro-Pure Systems, Inc. (EPS) under the Emerging Technology portion of the U.S. Environmental Protection Agency's (EPA's) Superfund Innovative Technology Evaluation (SITE) Program to study alternating current electrocoagulation for Superfund site remediation. Alternating current electrocoagulation has proven to be effective in agglomerating and removing colloidal solids, metals and certain organic contaminants from surrogate soils prepared from the US EPA's Synthetic Soil Matrix. Treatments under a wide range of operating conditions have enabled the optimum parameter settings to be established for multiple phase separation. Electrocoagulation enables appreciably enhanced filtration and dewatering rates to be realized for metals- and diesel fuel-spiked surrogate soil slurries; such enhancements are prompted by growth in the mean particle size of the clays and particulates from typically < 10 microns to as much as 150 microns depending on the degree of electrocoagulation. Reduction in the total suspended solids content of clays in all slurries in excess of 90% can routinely be achieved. Bench-scale experiments of the metals-spiked surrogate soils indicate that electrocoagulation preferentially concentrates soluble metals into the sludge phase; excellent metals separation (Pb, Cr, Cu, Cd) can be realized. Experiments on surrogate wastes spiked with volatile organics suggest that this technology is not capable of effecting good volatile extractions from the aqueous phase. Reductions in excess of 80% in the total organic carbon (TOC) content of the diesel fuel-spiked surrogates can, however, be achieved

  4. Environmental Restoration Strategic Plan. Remediating the nuclear weapons complex

    International Nuclear Information System (INIS)

    1995-08-01

    With the end of the cold war, the US has a reduced need for nuclear weapons production. In response, the Department of Energy has redirected resources from weapons production to weapons dismantlement and environmental remediation. To this end, in November 1989, the US Department of Energy (DOE) established the Office of Environmental Restoration and Waste Management (renamed the Office of Environmental Management in 1994). It was created to bring under a central authority the management of radioactive and hazardous wastes at DOE sites and inactive or shut down facilities. The Environmental Restoration Program, a major component of DOE's Environmental Management Program, is responsible for the remediation and management of contaminated environmental media (e.g., soil, groundwater, sediments) and the decommissioning of facilities and structures at 130 sites in over 30 states and territories

  5. DECISION ANALYSIS OF INCINERATION COSTS IN SUPERFUND SITE REMEDIATION

    Science.gov (United States)

    This study examines the decision-making process of the remedial design (RD) phase of on-site incineration projects conducted at Superfund sites. Decisions made during RD affect the cost and schedule of remedial action (RA). Decision analysis techniques are used to determine the...

  6. Remediation of Caldas Site by natural attenuation

    International Nuclear Information System (INIS)

    Chaves, Renata Dias Abreu; Rodrigues, Paulo César Horta; Ladeira, Ana Cláudia Queiroz

    2017-01-01

    Acid mine drainage (AMD) is one of the main environmental issue caused by chemical and bacterial oxidation of pyrite (FeS 2 ) and other sulfite minerals when exposed to atmospheric conditions during mining. In Brazil, AMD occurs in a former uranium mine and contains radionuclides and other elements, which are precipitated from acidic water by liming. Due to the inefficiency of the treatment, contaminants overflow to the water reservoir of Indústrias Nucleares do Brasil – INB in Caldas. The multiplicity of interactions that can occur between the contaminants and the sediments of the reservoir requires a broader approach in order to understand the fixation and/or transport of these elements. In this work the natural remediation approach is reviewed and an initial chemical and radiochemical characterization of the reservoir sediments is presented. Uranium was determined by spectrophotometry, Ra-226, Ra-228 and Pb-210 by gamma spectrometry and zinc by ICP-OES. Twenty-six sediment samples were collected in the reservoir and a bathymetry survey by sonar was performed to determine the thickness of the sediment layer. All the data were processed using the ArcGIS program. To assess the potential mobility and bioavailability of contaminants and to study the role of bacterial sulfate reduction in the immobilization of these contaminants, Acid-volatile sulfide (AVS) analyzes will be performed as a further step. (author)

  7. Remediation of Caldas Site by natural attenuation

    Energy Technology Data Exchange (ETDEWEB)

    Chaves, Renata Dias Abreu; Rodrigues, Paulo César Horta; Ladeira, Ana Cláudia Queiroz, E-mail: rda@cdtn.br, E-mail: pchr@cdtn.br, E-mail: acql@cdtn.br [Centro de Desenvolvimento da Tecnologia Nuclear (CDTN/CNEN-MG), Belo Horizonte, MG (Brazil)

    2017-07-01

    Acid mine drainage (AMD) is one of the main environmental issue caused by chemical and bacterial oxidation of pyrite (FeS{sub 2}) and other sulfite minerals when exposed to atmospheric conditions during mining. In Brazil, AMD occurs in a former uranium mine and contains radionuclides and other elements, which are precipitated from acidic water by liming. Due to the inefficiency of the treatment, contaminants overflow to the water reservoir of Indústrias Nucleares do Brasil – INB in Caldas. The multiplicity of interactions that can occur between the contaminants and the sediments of the reservoir requires a broader approach in order to understand the fixation and/or transport of these elements. In this work the natural remediation approach is reviewed and an initial chemical and radiochemical characterization of the reservoir sediments is presented. Uranium was determined by spectrophotometry, Ra-226, Ra-228 and Pb-210 by gamma spectrometry and zinc by ICP-OES. Twenty-six sediment samples were collected in the reservoir and a bathymetry survey by sonar was performed to determine the thickness of the sediment layer. All the data were processed using the ArcGIS program. To assess the potential mobility and bioavailability of contaminants and to study the role of bacterial sulfate reduction in the immobilization of these contaminants, Acid-volatile sulfide (AVS) analyzes will be performed as a further step. (author)

  8. Nuclear waste repository siting

    International Nuclear Information System (INIS)

    Soloman, B.D.; Cameron, D.M.

    1987-01-01

    This paper discusses the geopolitics of nuclear waste disposal in the USA. Constitutional choice and social equity perspectives are used to argue for a more open and just repository siting program. The authors assert that every potential repository site inevitably contains geologic, environmental or other imperfections and that the political process is the correct one for determining sites selected

  9. Environmental assessment of remedial action at the Naturita Uranium Processing Site near Naturita, Colorado. Revision 4

    Energy Technology Data Exchange (ETDEWEB)

    1994-05-01

    The Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law (PL) 95-604, authorized the US Department of Energy (DOE) to perform remedial action at the Naturita, Colorado, uranium processing site to reduce the potential health effects from the radioactive materials at the site and at vicinity properties associated with the site. The US Environmental Protection Agency (EPA) promulgated standards for the UMTRCA that contain measures to control the contaminated materials and to protect groundwater quality. Remedial action at the Naturita site must be performed in accordance with these standards and with the concurrence of the US Nuclear Regulatory Commission (NRC) and the state of Colorado. The proposed remedial action for the Naturita processing site is relocation of the contaminated materials and debris to either the Dry Flats disposal site, 6 road miles (mi) [10 kilometers (km)] to the southeast, or a licensed non-DOE disposal facility capable of handling RRM. At either disposal site, the contaminated materials would be stabilized and covered with layers of earth and rock. The proposed Dry Flats disposal site is on land administered by the Bureau of Land Management (BLM) and used primarily for livestock grazing. The final disposal site would cover approximately 57 ac (23 ha), which would be permanently transferred from the BLM to the DOE and restricted from future uses. The remedial action would be conducted by the DOE`s Uranium Mill Tailings Remedial Action (UMTRA) Project. This report discusses environmental impacts associated with the proposed remedial action.

  10. Environmental assessment of remedial action at the Naturita Uranium Processing Site near Naturita, Colorado

    International Nuclear Information System (INIS)

    1994-05-01

    The Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law (PL) 95-604, authorized the US Department of Energy (DOE) to perform remedial action at the Naturita, Colorado, uranium processing site to reduce the potential health effects from the radioactive materials at the site and at vicinity properties associated with the site. The US Environmental Protection Agency (EPA) promulgated standards for the UMTRCA that contain measures to control the contaminated materials and to protect groundwater quality. Remedial action at the Naturita site must be performed in accordance with these standards and with the concurrence of the US Nuclear Regulatory Commission (NRC) and the state of Colorado. The proposed remedial action for the Naturita processing site is relocation of the contaminated materials and debris to either the Dry Flats disposal site, 6 road miles (mi) [10 kilometers (km)] to the southeast, or a licensed non-DOE disposal facility capable of handling RRM. At either disposal site, the contaminated materials would be stabilized and covered with layers of earth and rock. The proposed Dry Flats disposal site is on land administered by the Bureau of Land Management (BLM) and used primarily for livestock grazing. The final disposal site would cover approximately 57 ac (23 ha), which would be permanently transferred from the BLM to the DOE and restricted from future uses. The remedial action would be conducted by the DOE's Uranium Mill Tailings Remedial Action (UMTRA) Project. This report discusses environmental impacts associated with the proposed remedial action

  11. Remediation of radioactively contaminated facilities and the site of Russian Research Center Kurchatov Institute

    International Nuclear Information System (INIS)

    Velikhov, E.P.; Ponomarev-Stepnoj, N.N.; Volkov, V.G.

    2007-01-01

    One discusses the efforts to rehabilitate the radiation hazard installations and to remediate the contaminated territory of the Kurchatov Institute RSC undertaken in 2006-2007 in terms of the Remediation Project. The old radwaste storage facilities constructed at the site when the Institute was involved in activities to elaborate both war and civil nuclear technologies were the basic objects of the rehabilitation efforts. Paper describes the structure of the storage facilities covering the volume and the characteristics of the stored radwaste. Paper discusses the storage facility site layout parameters taken into consideration in the course of the remediation efforts. Paper describes the procedures, the sequence of the remediation efforts and the peculiar features of the planning and engineering approaches. Paper dwells upon the results of the rehabilitation and the remediation efforts [ru

  12. Nuclear site selection studies

    International Nuclear Information System (INIS)

    Gharib, A.; Zohoorian Izadpanah, A.A.; Iranmanesh, H.

    2000-01-01

    It is of special importance, especially from the nuclear safety viewpoint, to select suitable sites for different nuclear structures with the considered future activities. Site selection sometimes involves high costs not necessarily for merely selecting of site but for some preliminary measures to be taken so as the site may have the necessary characteristics. The more suitable the natural characteristics of the site for the considered project, the more successful and efficient the project, the lower the project costs and the longer the project operation period. If so, the project will cause the growth of public culture and sustainable socioeconomic development. This paper is the result of the conclusion of numerous massive reports of this activity in the preliminary phase based on theories, practices and the related safety principles on this ground as well as the application of data and information of the past and a glance to the future. The conception of need for a site for medium structures and nuclear research projects and how to perform this process are presented step by step here with a scientific approach to its selection during the investigations. In this study, it is practically described how the site is selected, by determining and defining the characteristics of research and nuclear projects with medium structures and also its fitting to the optimum site. The discovered sites typically involve the best advantages in technical and economic aspects and no particular contrast with the concerned structures

  13. Green Remediation Best Management Practices: Mining Sites

    Science.gov (United States)

    This fact sheet describes best management practices (BMPs) that can be used to reduce the environmental footprint of cleanup activities associated with common project components, cleanup phases, and implementation of remediation technologies.

  14. Environmental Chemistry Principles in Site Remediation (CEECHE 2018 Krakow Poland)

    Science.gov (United States)

    In CEECHE meeting, we will present scientific, engineering information and case studies on sustainable and innovative remediation technologies used in contaminated sites in Europe and the United States. One of the most important tasks to be performed to remediate contaminated si...

  15. The observational approach for site remediation at federal facilities

    International Nuclear Information System (INIS)

    Myers, R.S.; Gianti, S.J.

    1989-11-01

    The observational approach, developed by geotechnical engineers to cope with the uncertainty associated with subsurface construction such as tunnels and dams, can be applied to hazardous waste site remediation. During the last year, the observational approach has gained increasing attention as a means of addressing the uncertainties involved in site remediation. In order to evaluate the potential advantages and constraints of applying the observational approach to site restoration at federal facilities, a panel of scientists and engineers from Pacific Northwest Laboratory and CH2M Hill was convened. Their review evaluated potential technical and institutional advantages and constraints that may affect the use of the observational approach for site remediation. This paper summarizes the panel's comments and conclusions about the application of the observational approach to site remediation at federal facilities. Key issues identified by the panel include management of uncertainty, cost and schedule, regulations and guidance, public involvement, and implementation. 5 refs

  16. Risk evaluation of remedial alternatives for the Hanford Site

    International Nuclear Information System (INIS)

    Clark, S.W.; Lane, N.K.; Swenson, L.

    1994-01-01

    Risk assessment is one of the many tools used to evaluate and select remedial alternatives and evaluate the risk associated with selected remedial alternatives during and after implementation. The risk evaluation of remedial alternatives (RERA) is performed to ensure selected alternatives are protective of human health and the environment. Final remedy selection is promulgated in a record of decision (ROD) and risks of the selected alternatives are documented. Included in the ROD documentation are the risk-related analyses for long-term effectiveness, short-term effectiveness, and overall protection of human health and the environment including how a remedy will eliminate, reduce or control risks and whether exposure will be reduced to acceptable levels. A major goal of RERA in the process leading to a ROD is to provide decision-makers with specific risk information that may be needed to choose among alternatives. For the Hanford Site, there are many considerations that must be addressed from a risk perspective. These include the large size of the Hanford Site, the presence of both chemical and radionuclide contamination, one likelihood of many analogues sites, public and worker health and safety, and stakeholder concern with ecological impacts from site contamination and remedial actions. A RERA methodology has been promulgated to (1) identify the points in the process leading to a ROD where risk assessment input is either required or desirable and (2) provide guidance on how to evaluate risks associated with remedial alternatives under consideration. The methodology and evaluations parallel EPA guidance requiring consideration of short-term impacts and the overall protectiveness of remedial actions for evaluating potential human health and ecological risks during selection of remedial alternatives, implementation of remedial measures, and following completion of remedial action

  17. Background report for the uranium-mill-tailings-sites remedial-action program

    International Nuclear Information System (INIS)

    1981-04-01

    The Uranium Mill Tailings Radiation Control Act of 1978, Public Law 95-604, mandates remedial action responsibilities to the Department of Energy for designated inactive uranium processing sites. To comply with the mandates of the Act, a program to survey and evaluate the radiological conditions at inactive uranium processing sites and at vicinity properties containing residual radioactive material derived from the sites is being conducted; the Remedial Action Program Office, Office of the Assistant Secretary for Nuclear Energy is implementing remedial actions at these processing sites. This report provides a brief history of the program, a description of the scope of the program, and a set of site-specific summaries for the 22 locations specified in the Act and three additional locations designated in response to Federal Register notices issued on August 17 and September 5, 1979. It is designed to be a quick source of background information on sites covered by the implementation program for Public Law 95-604

  18. Comparison of approaches for assessing sustainable remediation of contaminated sites

    DEFF Research Database (Denmark)

    Søndergaard, Gitte Lemming; Binning, Philip John; Bjerg, Poul Løgstrup

    2017-01-01

    It has been estimated that there are approximately 2.5 million potentially contaminated sites in Europe. Of these, approximately 340,000 sites are thought to be contaminated to a degree that may require remediation (Joint Research Center, 2014). Until recently, remediation was considered...... to be inherently green or sustainable since it removes a contaminant problem. However, it is now broadly recognized that while remediation is intended to address a local environmental threat, it may cause other local, regional and global impacts on the environment, society and economy. Over the last decade......, the broader assessment of these criteria is occurring in a movement toward ‘sustainable remediation’. This paper aims to review the available methods for assessing the sustainability of remediation alternatives. Sustainable remediation seeks to reduce direct contaminant point source impacts on the environment...

  19. Siting nuclear power plants

    International Nuclear Information System (INIS)

    Yellin, J.; Joskow, P.L.

    1980-01-01

    The first edition of this journal is devoted to the policies and problems of siting nuclear power plants and the question of how far commercial reactors should be placed from urban areas. The article is divided into four major siting issues: policies, risk evaluation, accident consequences, and economic and physical constraints. One concern is how to treat currently operating reactors and those under construction that were established under less-stringent criteria if siting is to be used as a way to limit the consequences of accidents. Mehanical cost-benefit analyses are not as appropriate as the systematic use of empirical observations in assessing the values involved. Stricter siting rules are justified because (1) opposition because of safety is growing: (2) remote siting will make the industry more stable; (3) the conflict is eliminated between regulatory policies and the probability basis for nuclear insurance; and (4) joint ownership of utilities and power-pooling are increasing. 227 references, 7 tables

  20. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Durango, Colorado: Remedial action selection report

    International Nuclear Information System (INIS)

    1991-12-01

    The uranium mill tailings site near Durango, Colorado, was one of 24 inactive uranium mill sites designated to be remediated by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). Part of the UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE's Remedial Action Plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). Included in the RAP is this Remedial Action Selection Report (RAS), which has been developed to serve a two-fold purpose. First, it describes the activities that have been conducted by the DOE to accomplish remediation and long-term stabilization and control of the radioactive materials at the inactive uranium mill processing site near Durango, Colorado. Secondly, this document and the rest of the RAP, upon concurrence and execution by the DOE, the State of Colorado, and the NRC, become Appendix B of the Cooperative Agreement between the DOE and the State of Colorado

  1. Radon impact at a remediated uranium mine site in Japan

    International Nuclear Information System (INIS)

    Ishimori, Yuu

    2011-01-01

    This paper mainly illustrates the radon impact of the closed uranium mine site remediated in 2007. The site remediated is the waste rock site located on the steep slope of a hill about 1.5 km upstream from a residential area along a main ravine. Major remedial action was to cover these waste rock yards with weathering granite soil. The radon flux density after remediation was intended to be 0.1 Bqm -2 s -1 in consideration with the natural background level around Ningyo-toge because there is no value of radon flux density regulated in Japan. Our action decreased the radon concentration in the site to natural background level, approximately from 10 to 40 Bqm -3 , although relatively high concentration in excess of 100 Bqm -3 was observed before remediation. On the other hand, our action did not decrease the radon concentrations around the site in general. This fact proved that the limited source such as waste rocks affected the radon concentrations at neighboring area only. The similar tendencies were also observed in other environmental data such as radon progeny concentrations. In conclusion, these findings proved that our remedial action was successful against radon. This fact will lead to more reasonable action plans for other closed mine sites. (author)

  2. Assessment of international remedial technologies for application to Superfund sites

    International Nuclear Information System (INIS)

    Sanning, D.E.

    1990-01-01

    This paper presents some of the logical arguments for conducting research on remedial technologies for contaminated land and groundwater at an international level. It gives information on many of the international organizations that are involved in environmental programs, but it especially gives emphasis to the NATO-CCMS pilot study on Demonstration of Remedial Action Technologies for Contaminated Land and Groundwater. The purpose of the study is to field demonstrate and evaluate new/innovative technologies for remedial action at uncontrolled hazardous waste sites. This study is a logical international extension of the US EPA SITE program. It offers the opportunity to obtain a multiple data base on various remedial action unit processes without any single country having to commit a disproportionate amount of its internal resources to any specific activity. Each participating country provides the necessary resources for those demonstrations which they are contributing to the study. Sites are selected by a majority vote of all participating countries (no country is permitted to vote for its own sites). The study is a 5 year program with participants from Canada, Denmark, Federal Republic of Germany, France, Greece, Italy, Japan, the Netherlands, Norway, Spain, and the US. The need for cost-effective remedial action technologies for hazardous waste sites is a problem of all industrialized countries. The need to build a knowledge base of emerging remedial technologies was the impetus behind the USEPA's lead role and commitment to this pilot study

  3. Remedial action work plan for the Colonie site. Revision 1

    International Nuclear Information System (INIS)

    1985-08-01

    The Colonie site is a DOE Formerly Utilized Sites Remedial Action Program (FUSRAP) site located in the Town of Colonie, New York, and consisting of an interim storage site and several vicinity properties. The Colonie Interim Storage Site (CISS) is the former National Lead (NL) Industries plant located at 1130 Central Avenue. There are 11 vicinity properties that received remedial action in 1984: 7 located south of the site on Yardboro and Palmer Avenues just across the Colonie-Albany town limits in Albany, and 4 located northwest of the site along Central Avenue in Colonie. Of these properties, nine are residences and two are commercial properties. This document describes the engineering design, construction, and associated plans for remedial action on the vicinity properties and the interim storage site. These plans include both radiological and chemical work. Radiological work includes: excavating the above-guideline radioactive wastes on the vicinity properties; designing required facilities for the interim storage site; preparing the interim storage site to receive these contaminated materials; transporting the contaminated materials to the interim waste storage stockpile; and preparing necessary schedules for accomplishing the remedial actions. Chemical work involves: developing the Resource Conservation and Recovery Act (RCRA) closure plans; neutralizing chemical hazards associated with plating solutions; inventorying on-site chemicals; and disposal of chemicals and/or residues. 17 refs., 5 figs., 1 tab

  4. Remedial Investigation of Hanford Site Releases to the Columbia River

    International Nuclear Information System (INIS)

    Lerch, J.A.

    2009-01-01

    In south-central Washington State, the Columbia River flows through the U.S. Department of Energy Hanford Site. A primary objective of the Hanford Site cleanup mission is protection of the Columbia River, through remediation of contaminated soil and groundwater that resulted from its weapons production mission. Within the Columbia River system, surface water, sediment, and biota samples related to potential Hanford Site hazardous substance releases have been collected since the start of Hanford operations. The impacts of Hanford Site hazardous substance releases to the Columbia River in areas upstream, within, and downstream of the Hanford Site boundary have been previously investigated as mandated by the U.S. Department of Energy requirements under the Atomic Energy Act. The impacts are now being assessed under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 via a remedial investigation. The Remedial Investigation Work Plan for Hanford Site Releases to the Columbia River has been developed and issued to initiate the remedial investigation. The work plan establishes a phased approach to characterize contaminants, assess current risks, and determine whether or not there is a need for any cleanup actions. Field investigation activities began in October 2008 and are anticipated to continue into Fall 2009 over a 120 mile stretch of the Columbia River. Information gained from performing this remedial investigation will ultimately be used to help make final regulatory decisions for cleaning up Hanford Site contamination that exists in and along the Columbia River. (authors)

  5. Nuclear power plant siting

    International Nuclear Information System (INIS)

    Sulkiewicz, M.; Navratil, J.

    The construction of a nuclear power plant is conditioned on territorial requirements and is accompanied by the disturbance of the environment, land occupation, population migration, the emission of radioactive wastes, thermal pollution, etc. On the other hand, a nuclear power plant makes possible the introduction of district heating and increases the economic and civilization activity of the population. Due to the construction of a nuclear power plant the set limits of negative impacts must not be exceeded. The locality should be selected such as to reduce the unfavourable effects of the plant and to fully use its benefits. The decision on the siting of the nuclear power plant is preceded by the processing of a number of surveys and a wide range of documentation to which the given criteria are strictly applied. (B.H.)

  6. Options Evaluation for Remediation of the Gunnar Site Using a Decision- Tree Approach

    Energy Technology Data Exchange (ETDEWEB)

    Yankovich, Tamara L. [International Atomic Energy Agency, P.O. Box 100, 1400 Vienna (Austria); Hachkowski, Andrea [CH2M Hill Canada Limited, 1305 Kenaston Blvd, Winnipeg, Manitoba, R3P 2P2 (Canada); Klyashtorin, Alexey [Saskatchewan Research Council, 15 Innovation Blvd no.125, Saskatoon, Saskatchewan, S7N 2X8 (Canada)

    2014-07-01

    Current best practice in the nuclear industry involves proactive planning of activities from cradle-to-grave over the entire nuclear life cycle in accordance with national requirements and international guidance. This includes the development of detailed decommissioning plans (DDP) at an early stage to facilitate proactive, responsible decision-making as activities are being planned. It should be noted, however, that the current approach may not be applicable to historic nuclear legacy sites, such as abandoned uranium mines and mills, which had operated in the past under less stringent regulatory regimes. In such cases, records documenting past activities are often not available and monitoring data may not have been collected, thereby limiting knowledge of impacts related to past activities. This can lead to challenges in gaining regulatory and funding approvals related to the remediation of such sites, especially given the costs that can be associated with remediation and the uncertainties in characterizing the existing situation. The Gunnar Site, in northern Saskatchewan, is an example of an abandoned uranium mine/mill site, which was operated between the late 1950's to early 1960's under a different regulatory regime than today. Due to the lack of monitoring data and records for the site, and the corresponding uncertainties, a number of precedent-setting approaches have been developed and applied, as part of the environmental impact assessment (EIA) process. Specifically, unlike traditional environmental assessments for planned and operating facilities, it was not possible to identify a preferred and alternative remedial option. Instead, a step-wise decision-tree approach has been developed to identify all potentially feasible remedial options and to map out key decision points, during the licensing phase of the project (following approval of the environmental assessment), when final remedial options will be selected. The presentation will provide

  7. Risk evaluation of remedial alternatives for the Hanford Site

    International Nuclear Information System (INIS)

    1994-09-01

    This document provides guidance on the process of risk evaluation of remedial alternatives (RERA) at the Hanford Site. Remediation activities at the Hanford Site are being conducted pursuant to the Comprehensive Environmental Restoration, Compensation, and Liability Act and the Resource Conservation and Recovery Act. This document identifies points in the remedial alternative selection process where risk assessment input is either required or desirable. For each of these points of application, the document identifies issues to consider and address, and suggests possible approaches, techniques, and appropriate levels of detail. The level of detail of a RERA is driven by the need to use risk as a criterion for selecting a remedial alternative. Such a document is needed to ensure that RERA is conducted in a consistent manner, and to prevent restating or creating guidance within each RERA

  8. Development of subsurface characterization method for decommissioning site remediation

    Energy Technology Data Exchange (ETDEWEB)

    Hong, Sang Bum; Nam, Jong Soo; Choi, Yong Suk; Seo, Bum Kyoung; Moon, Jei Kwon; Choi, Jong Won [KAERI, Daejeon (Korea, Republic of)

    2016-05-15

    In situ measurement of peak to valley method based on the ratio of counting rate between the full energy peak and Compton region was applied to identify the depth distribution of 137Cs. The In situ measurement and sampling results were applied to evaluate a residual radioactivity before and after remediation in decommissioning KRR site. Spatial analysis based on the Geostatistics method provides a reliable estimating the volume of contaminated soil with a graphical analysis, which was applied to the site characterization in the decommissioning KRR site. The in situ measurement and spatial analysis results for characterization of subsurface contamination are presented. The objective of a remedial action is to reduce risks to human health to acceptable levels by removing the source of contamination. Site characterization of the subsurface contamination is an important factor for planning and implementation of site remediation. Radiological survey and evaluation technology are required to ensure the reliability of the results, and the process must be easily applied during field measurements. In situ gamma-ray spectrometry is a powerful method for site characterization that can be used to identify the depth distribution and quantify radionuclides directly at the measurement site. The in situ measurement and Geostatistics method was applied to the site characterization for remediation and final status survey in decommissioning KRR site.

  9. Remediation of the Gunnar uranium mine site, northern Saskatchewan

    International Nuclear Information System (INIS)

    Calvert, H.T.; Brown, J.L.

    2011-01-01

    The Gunnar uranium mine, located in northern Saskatchewan, operated from 1955 to 1963. When the mine was closed, the site was not remediated to the standards that are in place for today's uranium mines. Waste rock and mill tailings were left un-covered and water quality issues were not addressed. As a result, the current state of the site impacts the local environment. The company that operated the Gunnar Mine no longer exists. In 2006, the Government of Saskatchewan and the Government of Canada entered into an agreement to share the costs for remediating the site. An environment assessment of the project to remediate the site is currently underway. This paper provides an update of the issues and the progress being made. (author)

  10. Post-Remediation Radiological Dose Assessment, Linde Site, Tonawanda, New York

    Energy Technology Data Exchange (ETDEWEB)

    Kamboj, Sunita [Argonne National Lab. (ANL), Argonne, IL (United States); Durham, Lisa A. [Argonne National Lab. (ANL), Argonne, IL (United States)

    2014-06-01

    A post-remediation radiological dose assessment was conducted for the Formerly Utilized Sites Remedial Action Program (FUSRAP) Linde Site by using the measured residual concentrations of the radionuclides of concern following the completion of the soils remedial action. The site’s FUSRAP-related contaminants of concern (COCs) are radionuclides associated with uranium processing activities conducted by the Manhattan Engineer District (MED) in support of the Nation’s early atomic energy and weapons program and include radium-226 (Ra-226), thorium-230 (Th-230), and total uranium (Utotal). Remedial actions to address Linde Site soils and structures were conducted in accordance with the Record of Decision for the Linde Site, Tonawanda, New York (ROD) (USACE 2000a). In the ROD, the U.S. Army Corps of Engineers (USACE) determined that the cleanup standards found in Title 40, Part 192 of the Code of Federal Regulations (40 CFR Part 192), the standards for cleanup of uranium mill sites designated under the Uranium Mill Tailings Radiation Control Act (UMTRCA), and the Nuclear Regulatory Commission (NRC) standards for decommissioning of licensed uranium and thorium mills, found in 10 CFR Part 40, Appendix A, Criterion 6(6), are Applicable or Relevant and Appropriate Requirements (ARARs) for cleanup of MED-related contamination at the Linde Site. The major elements of this remedy will involve excavation of the soils with COCs above soil cleanup levels and placement of clean materials to meet the other criteria of 40 CFR Part 192.

  11. Inorganic ion exchangers for nuclear waste remediation

    Energy Technology Data Exchange (ETDEWEB)

    Clearfield, A.; Bortun, A.; Bortun, L.; Behrens, E. [Texas A& M Univ., College Station, TX (United States)

    1997-10-01

    The objective of this work is to provide a broad spectrum of inorganic ion exchangers that can be used for a range of applications and separations involving remediation of groundwater and tank wastes. The authors intend to scale-up the most promising exchangers, through partnership with AlliedSignal Inc., to provide samples for testing at various DOE sites. While much of the focus is on exchangers for removal of Cs{sup +} and Sr{sup 2+} from highly alkaline tank wastes, especially at Hanford, the authors have also synthesized exchangers for acid wastes, alkaline wastes, groundwater, and mercury, cobalt, and chromium removal. These exchangers are now available for use at DOE sites. Many of the ion exchangers described here are new, and others are improved versions of previously known exchangers. They are generally one of three types: (1) layered compounds, (2) framework or tunnel compounds, and (3) amorphous exchangers in which a gel exchanger is used to bind a fine powder into a bead for column use. Most of these exchangers can be regenerated and used again.

  12. Remedial action plan and site design for stabilization of the inactive uranium processing site at Naturita, Colorado

    International Nuclear Information System (INIS)

    1994-03-01

    The uranium processing site near Naturita, Colorado, is one of 24 inactive uranium mill sites designated to be cleaned up by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), 42 USC section 7901 et seq. Part of the UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE's remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). Included in the RAP is this Remedial Action Selection Report (RAS), which describes the proposed remedial action for the Naturita site. An extensive amount of data and supporting information has been generated and evaluated for this remedial action. These data and supporting information are not incorporated into this single document but are included or referenced in the supporting documents. The RAP consists of this RAS and four supporting documents or attachments. This Attachment 2, Geology Report describes the details of geologic, geomorphic, and seismic conditions at the Dry Flats disposal site

  13. PROBABILISTIC RISK ANALYSIS OF REMEDIATION EFFORTS IN NAPL SITES

    Science.gov (United States)

    Fernandez-Garcia, D.; de Vries, L.; Pool, M.; Sapriza, G.; Sanchez-Vila, X.; Bolster, D.; Tartakovsky, D. M.

    2009-12-01

    The release of non-aqueous phase liquids (NAPLs) such as petroleum hydrocarbons and chlorinated solvents in the subsurface is a severe source of groundwater and vapor contamination. Because these liquids are essentially immiscible due to low solubility, these contaminants get slowly dissolved in groundwater and/or volatilized in the vadoze zone threatening the environment and public health over a long period. Many remediation technologies and strategies have been developed in the last decades for restoring the water quality properties of these contaminated sites. The failure of an on-site treatment technology application is often due to the unnoticed presence of dissolved NAPL entrapped in low permeability areas (heterogeneity) and/or the remaining of substantial amounts of pure phase after remediation efforts. Full understanding of the impact of remediation efforts is complicated due to the role of many interlink physical and biochemical processes taking place through several potential pathways of exposure to multiple receptors in a highly unknown heterogeneous environment. Due to these difficulties, the design of remediation strategies and definition of remediation endpoints have been traditionally determined without quantifying the risk associated with the failure of such efforts. We conduct a probabilistic risk assessment of the likelihood of success of an on-site NAPL treatment technology that easily integrates all aspects of the problem (causes, pathways, and receptors). Thus, the methodology allows combining the probability of failure of a remediation effort due to multiple causes, each one associated to several pathways and receptors.

  14. Challenges for Deep Vadose Zone Remediation at the Hanford Site

    International Nuclear Information System (INIS)

    Morse, John G.; Charboneau, Briant L.; Lober, Robert W.; Triplett, Mark B.

    2008-01-01

    The 'deep vadose zone' is defined as the region below the practical depth of surface remedy influence (e.g., excavation or barrier). At the Hanford Site, this region of the Central Plateau poses unique challenges for characterization and remediation. The contaminants in this region also pose a potentially significant continuing or future threat to groundwater. Currently, deep vadose zone characterization efforts and remedy selection are spread over multiple waste site Operable Units and tank farm Waste Management Areas. A particular challenge for this effort is the situation in which past leaks from single-shell tanks have become commingled with discharges from nearby liquid disposal sites. The Hanford Site is working with all affected parties, including the Washington State Department of Ecology, the Environmental Protection Agency, DOE-RL, DOE-ORP, and multiple contractor organizations to develop a unified approach to conducting work and reaching remediation decisions. This effort addresses the complex and challenging technical and regulatory issues within this environment. A true inter-Agency effort is evaluating the best strategy or combination of strategies for focusing technical investigations, including treatability studies, and for attaining remedy decisions on the Hanford Site

  15. Description of the Formerly Utilized Sites Remedial Action Program

    International Nuclear Information System (INIS)

    1980-09-01

    The background and the results to date of the Department of Energy program to identify and evaluate the radiological conditions at sites formerly utilized by the Corps of Engineers' Manhattan Engineer District (MED) and the US Atomic Energy Commission (AEC) are summarized. The sites of concern were federally, privately, and institutionally owned and were used primarily for research, processing, and storage of uranium and thorium ores, concentrates, or residues. Some sites were subsequently released for other purposes without radiological restriction. Surveys have been conducted since 1974 to document radiological conditions at such sites. Based on radiological surveys, sites are identified in this document that require, or are projected to require, remedial action to remove potential restrictions on the use of the property due to the presence of residual low-level radioactive contamination. Specific recommendations for each site will result from more detailed environmental and engineering surveys to be conducted at those sites and, if necessary, an environmental impact assessment or environmental impact statement will be prepared. Section 3.0 describes the current standards and guidelines now being used to conduct remedial actions. Current authority of the US Department of Energy (DOE) to proceed with remedial actions and the new authority required are summarized. A plan to implement the Formerly Utilized Sites Remedial Action Program (FUSRAP) in accordance with the new authority is presented, including the objectives, scope, general approach, and a summary schedule. Key issues affecting schedule and cost are discussed

  16. Description of the Formerly Utilized Sites Remedial Action Program

    Energy Technology Data Exchange (ETDEWEB)

    1980-09-01

    The background and the results to date of the Department of Energy program to identify and evaluate the radiological conditions at sites formerly utilized by the Corps of Engineers' Manhattan Engineer District (MED) and the US Atomic Energy Commission (AEC) are summarized. The sites of concern were federally, privately, and institutionally owned and were used primarily for research, processing, and storage of uranium and thorium ores, concentrates, or residues. Some sites were subsequently released for other purposes without radiological restriction. Surveys have been conducted since 1974 to document radiological conditions at such sites. Based on radiological surveys, sites are identified in this document that require, or are projected to require, remedial action to remove potential restrictions on the use of the property due to the presence of residual low-level radioactive contamination. Specific recommendations for each site will result from more detailed environmental and engineering surveys to be conducted at those sites and, if necessary, an environmental impact assessment or environmental impact statement will be prepared. Section 3.0 describes the current standards and guidelines now being used to conduct remedial actions. Current authority of the US Department of Energy (DOE) to proceed with remedial actions and the new authority required are summarized. A plan to implement the Formerly Utilized Sites Remedial Action Program (FUSRAP) in accordance with the new authority is presented, including the objectives, scope, general approach, and a summary schedule. Key issues affecting schedule and cost are discussed.

  17. Methods for the analysis and remediation of contaminated sites

    International Nuclear Information System (INIS)

    Mariani, M.; Bemporad, E.; Berardi, S.; Marino, A.; Paglietti, F.

    2008-01-01

    In Italy, in recent years, the number of contaminated sites has multiplied disproportionately. In essence, contamination is caused by accidental spills or intentional discharge of pollutants into the soils or waters from industrial activities, or non-controlled deposits of urban and/or industrial waste, mostly part toxic and harmful. Contaminated sites clearly pose risks to human health and the environment; hence the need to remediate these sites. The remediation of soil and water and the restoration of degraded areas are complex operations requiring specific technical and scientific know-how, including knowledge of the methodologies and tools required to tackle problems arising during the different phases of the remediation process. These include, in particular: - health and environmental risk assessment procedures for the quantification of risks to human health (general population and workers) and the environment from a contaminated site; - remote sensing and the Geographical Information Systems (GIS), which are a fundamentally important IT support for each phase of planning and management of remediation interventions; - criteria for the management of sites contaminated by asbestos, a highly carcinogenic and therefore hazardous substance that was widely used in the past due to its particular mechanical and thermal characteristics; - analysis of the issues relating to waste management in contaminated sites; - relationship between safety procedures for workers and the general population. Identification of the best available techniques for an efficient, integrated management of contaminated sites, which will also take into account the health protection of workers and of the general population living near such sites

  18. Green Remediation Best Management Practices: Site Investigation

    Science.gov (United States)

    The U.S. EPA Principles for Greener Cleanups outline the Agency's policy for evaluating and minimizing the environmental 'footprint' of activities undertaken when cleaning up a contaminated site and conducting site investigation.

  19. Almost remediation of saltwater spills at E and P sites

    International Nuclear Information System (INIS)

    Carty, D.J.

    1995-01-01

    At exploration and production (E and P) sites crude spills restricted to topsoil are often self-remediating, but salt spills rarely are. Most soils naturally biodegrade crude. Without appropriate human intervention, brine spills can result in decades of barren land and seriously degrade surface water and aquifers. Servicing the E and P industry are remediation practitioners with a limited array of often expensive remediation concepts and materials which they hope will work, and sometimes do. Unfortunately, many remediation practitioners are unfamiliar with, or disregard, the natural physical, chemical, and biotic complexity of the soil and aquatic media. All too often this results in exacerbating injury to an already damaged ecosystem. Likewise, important cultural factors such as public relations, environmental regulations, property rights, and water rights are also overlooked until after implementation of an ill-advised or illegal remediation design has been initiated. A major issue is determining what constitutes ''successful'' remediation of a brine spill. Environmental managers have long sought one or two universally applicable fast and cheap amendment/treatment protocols for all their diverse multi-state salt affected spill scenarios. This presentation describes aspects of common spill-affected ecosystems which must be considered to achieve ''successful'' remediation

  20. Integrated program management for major nuclear decommissioning and environmental remediation projects - 59068

    International Nuclear Information System (INIS)

    Lehew, John

    2012-01-01

    Document available in abstract form only. Full text of publication follows: CH2M HILL Plateau Remediation Company (CH2M HILL) is the U.S. Department of Energy's (DOE) contractor responsible for the safe, environmental cleanup of the Hanford Sites Central Plateau, sections of the Columbia River Corridor and the Hanford Reach National Monument. The 586-square-mile Hanford Site is located along the Columbia River in southeastern Washington, U.S.A. A plutonium production complex, housing the largest volume of radioactive and contaminated waste in the nation, with nine nuclear reactors and associated processing facilities, Hanford played a pivotal role in the nation's defense for more than 40 years, beginning in the 1940's with the Manhattan Project. Today, under the direction of the DOE, Hanford is engaged in one of the world's largest environmental cleanup project. The Plateau Remediation Contract is a 10-year project paving the way for closure of the Hanford Site. The site through its location, climate, geology and proximity to the Columbia River in combination with the results of past nuclear operations presents a highly complex environmental remediation challenge. The complexity is not only due to the technical issues associated with decommissioning nuclear facilities, remediating soil contamination sites, dispositioning legacy waste and fuel materials and integrating these with the deep vadose zone and groundwater remediation

  1. Evaluation of critical pathways, radionuclides, and remedial measures for reducing the radiological dose to returning populations at a former nuclear test site

    Energy Technology Data Exchange (ETDEWEB)

    Robison, W. L., LLNL

    1997-11-01

    Bikini Island, the major residence island at Bikini Atoll, was contaminated with radioactive fallout as a result of the BRAVO test conducted on March 1, 1954. We have identified the critical radionuclides and supplied radiological data needed to develop dose estimates for all possible exposure pathways. These estimates show that the major dose to returning populations would result from ingestion of cesium-137 (137 Cs) in locally grown terrestrial foods where the predicted population average effective dose exceeds current federal guidelines. Consequently, we designed several long-term field experiments to develop and evaluate methods to reduce the 137 Cs content in locally grown foods.This paper gives a general outline of the remediation experiments with a more detailed description of a preferred combined option. Our comparative evaluation on various remedial methods show that the combined option--potassium treatment of the entire islands with limited excavation of soil in village an d housing areas--will be effective in reducing the dose to about 10% of pretreatment levels, and offers very significant benefits with respect to adverse environmental impacts as well as savings in overall costs, time, and required expert resources.

  2. Building dismantlement and site remediation at the Apollo Fuel Plant: When is technology the answer?

    International Nuclear Information System (INIS)

    Walton, L.

    1995-01-01

    The Apollo fuel plant was located in Pennsylvania on a site known to have been used continuously for stell production from before the Civil War until after World War II. Then the site became a nuclear fuel chemical processing plants. Finally it was used to convert uranium hexafluoride to various oxide fuel forms. After the fuel manufacturing operations were teminated, the processing equipment was partially decontaminated, removed, packaged and shipped to a licensed low-level radioactive waste burial site. The work was completed in 1984. In 1990 a detailed site characterization was initiated to establishe the extent of contamination and to plan the building dismantlement and soil remediation efforts. This article discusses the site characterization and remedial action at the site in the following subsections: characterization; criticality control; mobile containment; soil washing; in-process measurements; and the final outcome of the project

  3. Human health and other risk drivers to prioritize site remediation

    Energy Technology Data Exchange (ETDEWEB)

    McHugh, T.; Connor, J. [Groundwater Services Inc, Houston, TX (United States)

    2003-07-01

    Remedial actions at soil and groundwater cleanup sites have traditionally been addressed on an individual, case-by-case basis, as needed to address regulatory requirements. However, effective management of large portfolios of remediation sites (such as hundreds or thousands of underground storage tank sites owned by a single company) requires coordination and prioritisation of individual site response actions to optimise the degree of risk reduction achieved with available resources. To meet these management objectives, two new risk-based management tools have been developed and implemented by the authors: i) a simple risk-based classification system, that can be employed to prioritise response actions, identify key risk drivers, and measure risk reduction progress over time for the full site portfolio; and ii) a lifecycle cost management system that can be employed to forecast remediation spending and optimise risk reduction benefits. For use in prioritising response actions at remediation sites, 'risk' is defined as the negative consequence of no action. (orig.)

  4. Surface water management at a mixed waste remediation site

    International Nuclear Information System (INIS)

    Schlotzhauer, D.S.; Warbritton, K.R.

    1991-01-01

    The Weldon Spring Remedial Action Project (WSSRAP) deals with chemical and radiological contaminants. MK-Ferguson Company is managing the project under contract with the US Department of Energy. Remedial activities include demolishing buildings, constructing material storage and staging areas, excavating and consolidating waste materials, and treating and disposing of the materials in a land disposal facility. Due to the excavation and construction required during remediation, a well-planned surface water management system is essential. Planning involves characterization of source areas and surface water transport mechanisms and identification of applicable regulations. System components include: erosion control sediment control, flow attenuation, and management of contaminated water. Combinations of these components may be utilized during actual construction and remediation to obtain optimum control. Monitoring is performed during implementation in order to assess the effectiveness of control measures. This management scheme provides for comprehensive management of surface water at this site by providing control and/or treatment to appropriate standards. Although some treatment methodologies for contaminated water are specific to site contaminants, this comprehensive program provides a management approach which is applicable to many remedial projects in order to minimize contaminant release and meet Clean Water Act requirements

  5. Cost-efficient remediation of an upstream oilfield battery site

    Energy Technology Data Exchange (ETDEWEB)

    Siebert, L.D. [Imperial Oil Resources Canada, Calgary, AB (Canada); Bedard, G.; Pouliot, M.; Soucy, F.; Faucher, C.; Corbin, R. [Biogenie Inc., Quebec City, PQ (Canada)

    2003-07-01

    The soil at an oilfield battery site, located 18 kilometres (km) northwest of Devon, Alberta has been contaminated with crude oil and salt, following years of operation. Surrounding the site is flat farmland intended for future agricultural production. A remedial program aimed at complying with Tier I criteria of the Alberta Soil and Water Quality Guidelines for Hydrocarbons at Upstream Oil and Gas Facilities (ASWQG) of Alberta Environment, was developed and implemented. Characterization of the site was carried out in 1997 to delineate a salt plume, followed by a second sampling campaign in 1999, which all together revealed three impacted areas. A supplementary characterization was performed in 2001 by Biogenie in an effort to better determine the nature and level of petroleum contamination and more accurately evaluate the volume of contaminated soil. A three-dimensional Visualization software integrating a Kriging geostatistical model was used for this purpose. The results indicated that an estimated 8,800 cubic metres of contaminated soil would need to be excavated and treated. The next phase involved an evaluation of the various remedial options, which was accomplished using a biotreatability study. The remediation program selected involved the excavation of the contaminated soil and segregation of source material, the ex-situ Biopile treatment of the source material to meet Class II landfill criteria, and the ex-situ Biopile treatment of the contaminated soil followed by its use as backfill on site. The biotreatability study proved to be a strategic tool in the remediation effort. 1 tab., 2 figs.

  6. EXPERIENCE IN INCINERATION APPLICABLE TO SUPERFUND SITE REMEDIATION

    Science.gov (United States)

    This document can be used as a reference tool for hazardous waste site remediation where incineration is used as a treatment alternative. It provides the user with information garnered from the experiences of others who use incineration. The document presents useful lessons in ev...

  7. Remediation management of complex sites using an adaptive site management approach.

    Science.gov (United States)

    Price, John; Spreng, Carl; Hawley, Elisabeth L; Deeb, Rula

    2017-12-15

    Complex sites require a disproportionate amount of resources for environmental remediation and long timeframes to achieve remediation objectives, due to their complex geologic conditions, hydrogeologic conditions, geochemical conditions, contaminant-related conditions, large scale of contamination, and/or non-technical challenges. A recent team of state and federal environmental regulators, federal agency representatives, industry experts, community stakeholders, and academia worked together as an Interstate Technology & Regulatory Council (ITRC) team to compile resources and create new guidance on the remediation management of complex sites. This article summarizes the ITRC team's recommended process for addressing complex sites through an adaptive site management approach. The team provided guidance for site managers and other stakeholders to evaluate site complexities and determine site remediation potential, i.e., whether an adaptive site management approach is warranted. Adaptive site management was described as a comprehensive, flexible approach to iteratively evaluate and adjust the remedial strategy in response to remedy performance. Key aspects of adaptive site management were described, including tools for revising and updating the conceptual site model (CSM), the importance of setting interim objectives to define short-term milestones on the journey to achieving site objectives, establishing a performance model and metrics to evaluate progress towards meeting interim objectives, and comparing actual with predicted progress during scheduled periodic evaluations, and establishing decision criteria for when and how to adapt/modify/revise the remedial strategy in response to remedy performance. Key findings will be published in an ITRC Technical and Regulatory guidance document in 2017 and free training webinars will be conducted. More information is available at www.itrc-web.org. Copyright © 2017 Elsevier Ltd. All rights reserved.

  8. Program management strategies for following EPA guidance for remedial design/remedial action at DOE sites

    International Nuclear Information System (INIS)

    Hopper, J.P.; Chew, J.R.; Kowalski, T.E.

    1991-01-01

    At the US Department of Energy (DOE) facilities, environmental restoration is being conducted in accordance with Federal Facilities Compliance Agreements (or Interagency Agreements). These agreements establish a cooperative working relationship and often define roles, responsibilities and authorities for conduct and oversight of the Remedial Action Programs. The US Environmental Protection Agency (EPA) has guidelines on how to initiate and perform remedial actions for sites they are remediating under the Comprehensive Environmental Response Compensation and Liability Act (CERCLA) as amended by the Superfund Amendments and Re-Authorization Act (SARA). This paper addresses some of the difference and commonalities between the DOE project management procedures and EPA guidance documents. This report covers only the RD/RA phase of environmental restoration. On the surface, there are many apparent differences between the DOE and EPA project management processes. Upon closer review, however, many of the differences are the result of applying different terminology to the same phase of a project. By looking for the similarities in the two processes rather than hunting for differences, many communication problems are avoided. Understanding both processes also aids in figuring out when, how and to what extent EPA should participate in the RD/RA phase for DOE lead cleanup activities. The DOE Remedial Design and Remedial Action process is discussed in a stepwise manner and compared to the EPA process. Each element of the process is defined. Activities common to both the EPA and DOE are correlated. The annual DOE budget cycle for remediation projects and the four-year cycle for appropriation of remediation funds are discussed, and the constraints of this process examined. DOE orders as well as other requirements for RD/RA activities are summarized and correlated to EPA regulations where this is possible

  9. Remedial action plan for the inactive Uranium Processing Site at Naturita, Colorado. Remedial action plan: Attachment 2, Geology report, Attachment 3, Ground water hydrology report: Working draft

    International Nuclear Information System (INIS)

    1994-09-01

    The uranium processing site near Naturita, Colorado, is one of 24 inactive uranium mill sites designated to be cleaned up by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), 42 USC section 7901 et seq. Part of the UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE's remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). This RAP serves two purposes. First, it describes the activities that are proposed by the DOE to accomplish remediation and long-term stabilization and control of the radioactive materials at the inactive uranium processing site near Naturita, Colorado. Second, this RAP, upon concurrence and execution by the DOE, the state of Colorado, and the NRC, become Appendix B of the cooperative agreement between the DOE and the state of Colorado

  10. Formerly utilized sites: remedial action, a bibliography

    International Nuclear Information System (INIS)

    McLaren, L.H.

    1982-11-01

    This bibliography contains information on formerly utilized sites included in the Department of Energy's Data Base from January 1981 through October 1982. The abstracts are grouped by subject category. Within each category the arrangement is by report number for reports, followed by nonreports in reverse chronological order. These citations are to research reports, journal articles, books, patents, theses, and conference papers from worldwide sources. Five indexes, each preceded by a brief description, are provided: corporate author, personal author, subject, contract number, and report number. (115 abstracts)

  11. Annual status report on the inactive uranium mill tailings sites remedial action program

    Energy Technology Data Exchange (ETDEWEB)

    1979-12-01

    Assessments of inactive uranium mill tailings sites in the United States led to the designation of 25 processing sites for remedial action under the provisions of Section 102(a) Public Law 95-604. The Department of Energy assessed the potential health effects to the public from the residual radioactive materials on or near the 25 sites; and, with the advice of the Environmental Protection Agency, the Secretary established priorities for performing remedial action. In designating the 25 sites and establishing the priorities for performing remedial action, the Department of Energy consulted with the Environmental Protection Agency, Nuclear Regulatory Commission, Department of the Interior, governors of the affected States, Navajo Nation, and appropriate property owners. Public participation in this process was encouraged. During Fiscal Year 1980, Department of Energy will be conducting surveys to verify the radiological characterization at the designated processing sites; developing cooperative agreements with the affected States; and initiating the appropriate National Environmental Policy Act documentation prior to conducting specific remedial actions.

  12. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Falls City, Texas

    International Nuclear Information System (INIS)

    Chernoff, A.R.; Lacker, D.K.

    1992-09-01

    The uranium processing site near Falls City, Texas, was one of 24 inactive uranium mill sites designated to be remediated by the US Department of Energy (DOE) under Title I of the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). The UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE's remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). The RAP, which includes this summary remedial action selection report (RAS), serves a two-fold purpose. First, it describes the activities proposed by the DOE to accomplish long-term stabilization and control of the residual radioactive materials at the inactive uranium processing site near Falls City, Texas. Second, this document and the remainder of the RAP, upon concurrence and execution by the DOE, the State of Texas, and the NRC, becomes Appendix B of the Cooperative Agreement between the DOE and the State of Texas

  13. Remedial action plan and site design for stabilization of the inactive uranium processing site at Naturita, Colorado

    International Nuclear Information System (INIS)

    1993-08-01

    The uranium processing site near Naturita, Colorado, is one of 24 inactive uranium mill sites designated to be cleaned up by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), Public Law 95-604. Part of the UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE's remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). Included in the RAP is this Remedial Action Selection Report (RAS), which serves two purposes. First, it describes the activities that are proposed by the DOE to accomplish remediation and long-term stabilization and control of the radioactive materials at the inactive uranium processing site near Naturita, Colorado. Second, this document and the rest of the RAP, upon concurrence and execution by the DOE, the state of Colorado, and the NRC, become Appendix B of the cooperative agreement between the DOE and the State of Colorado

  14. Remedial Action Plan and site conceptual design for stabilization of the inactive uranium mill tailings site at Spook, Wyoming

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, M L [USDOE Albuquerque Operations Office, NM (United States). Uranium Mill Tailings Remedial Action Project Office; Sullivan, M [Wyoming State Government, Cheyenne, WY (United States)

    1990-04-01

    This Remedial Action Plan (RAP) has been developed to serve a threefold purpose. It presents the series of activities which are proposed by the US Department of Energy (DOE) to accomplish long-term stabilization and control of radioactive materials at an inactive uranium processing site northeast of Casper, Wyoming, and referred to as the Spook site. It provides a characterization of the present conditions at the site and also serves to document the concurrence of the State of Wyoming and the US Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by the DOE and the State of Wyoming, and concurrence by the NRC, becomes Appendix B of the Cooperative Agreement.

  15. Remedial Action Plan and site conceptual design for stabilization of the inactive uranium mill tailings site at Spook, Wyoming

    International Nuclear Information System (INIS)

    Matthews, M.L.

    1990-04-01

    This Remedial Action Plan (RAP) has been developed to serve a threefold purpose. It presents the series of activities which are proposed by the US Department of Energy (DOE) to accomplish long-term stabilization and control of radioactive materials at an inactive uranium processing site northeast of Casper, Wyoming, and referred to as the Spook site. It provides a characterization of the present conditions at the site and also serves to document the concurrence of the State of Wyoming and the US Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by the DOE and the State of Wyoming, and concurrence by the NRC, becomes Appendix B of the Cooperative Agreement

  16. International developments in uranium mining and mill site remediation

    International Nuclear Information System (INIS)

    Quarch, H.; Kuhlmann, J.; Daroussin, J.L.; Poyser, R.W.

    1993-01-01

    At the end of production, mine sites, mill sites, tailings ponds, heap leaching residues in uranium mining districts world-wide have to be remediated in a responsible and sustainable manner in order to minimize long term environmental impacts. Current practice, regulatory environments and rehabilitation objectives in some of the most important uranium producing countries are briefly characterized as well as applicable radioprotection and geotechnical criteria. Important local and regional variables are outlined which determine optimal site specific solutions. Examples from Europe and North America are shown. Monitoring and control requirements as well as areas of current and necessary research and development are identified

  17. UMTRA [Uranium Mill Tailings Remedial Action] Project site management manual

    International Nuclear Information System (INIS)

    1990-10-01

    The purpose of this manual is to summarize the organizational interfaces and the technical approach used to manage the planning, design development, National Environmental Policy Act (NEPA) compliance, engineering, and remedial action required to stabilize and control the designated Uranium Mill Tailings Remedial Action (UMTRA) Project sites. This manual describes the Project's objective, participants' roles and responsibilities, technical approach for accomplishing the objective, and planning and managerial controls to be used in performing the site work. The narrative follows the flow of activities depicted in Figure 1.1, which provides the typical sequence of key Project activities. A list of acronyms used is presented at the end of the manual. The comparable manual for UMTRA Project vicinity properties is the ''Vicinity Properties Management and Implementation Manual'' (VPMIM) (UMTRA-DOE/AL-050601). Together, the two manuals cover the remedial action activities associated with UMTRA Project sites. The UMTRA Project's objective is to stabilize and control the uranium mill tailings, vicinity property materials, and other residual radioactive materials at the designated sites (Figure 1.2) in a safe and environmentally sound manner in order to minimize radiation health hazards to the public. 26 figs., 6 tabs

  18. Environmental assessment of remedial action at the Naturita uranium processing site near Naturita, Colorado: Revision 5

    Energy Technology Data Exchange (ETDEWEB)

    1994-10-01

    Title 1 of the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law (PL) 95-604, authorized the US Department of Energy (DOE) to perform remedial action at the inactive Naturita, Colorado, uranium processing site to reduce the potential health effects from the radioactive materials at the site and at vicinity properties associated with the site. Title 2 of the UMTRCA authorized the US Nuclear Regulatory Commission (NRC) or agreement state to regulate the operation and eventual reclamation of active uranium processing sites. The uranium mill tailings at the site were removed and reprocessed from 1977 to 1979. The contaminated areas include the former tailings area, the mill yard, the former ore storage area, and adjacent areas that were contaminated by uranium processing activities and wind and water erosion. The Naturita remedial action would result in the loss of 133 acres (ac) of contaminated soils at the processing site. If supplemental standards are approved by the NRC and the state of Colorado, approximately 112 ac of steeply sloped contaminated soils adjacent to the processing site would not be cleaned up. Cleanup of this contamination would have adverse environmental consequences and would be potentially hazardous to remedial action workers.

  19. Environmental assessment of remedial action at the Naturita uranium processing site near Naturita, Colorado: Revision 5

    International Nuclear Information System (INIS)

    1994-10-01

    Title 1 of the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law (PL) 95-604, authorized the US Department of Energy (DOE) to perform remedial action at the inactive Naturita, Colorado, uranium processing site to reduce the potential health effects from the radioactive materials at the site and at vicinity properties associated with the site. Title 2 of the UMTRCA authorized the US Nuclear Regulatory Commission (NRC) or agreement state to regulate the operation and eventual reclamation of active uranium processing sites. The uranium mill tailings at the site were removed and reprocessed from 1977 to 1979. The contaminated areas include the former tailings area, the mill yard, the former ore storage area, and adjacent areas that were contaminated by uranium processing activities and wind and water erosion. The Naturita remedial action would result in the loss of 133 acres (ac) of contaminated soils at the processing site. If supplemental standards are approved by the NRC and the state of Colorado, approximately 112 ac of steeply sloped contaminated soils adjacent to the processing site would not be cleaned up. Cleanup of this contamination would have adverse environmental consequences and would be potentially hazardous to remedial action workers

  20. From principles to practice in site remediation: Specific application in the UK

    International Nuclear Information System (INIS)

    Hill, M.; Higgins, P.; Longley, P.; Kerrigan, E.; Smith, G.M.

    2005-01-01

    As a result of wide-scale application of radioactive materials in research, medicine, defence, nuclear power and industry, significant areas of land have become contaminated with radioactivity. Whilst many practices aim to minimise the potential for contamination, there remain a number of sites that are contaminated as a result of historical discharges and accidental releases. In the UK, defence sites are being remediated to be released for redevelopment. International principles, national guidelines and best practice are taken into account, but quantities of low or very low activity radioactive waste are generated, and require disposal. This paper discusses these issues and illustrates their implementation at a specific site in the UK. (author)

  1. Considering bioavailability in the remediation of heavy metal contaminated sites

    Directory of Open Access Journals (Sweden)

    Leita L.

    2013-04-01

    Full Text Available Many years of research have demonstrated that instead of the total concentration of metals in soil, bioavailability is the key to understand the environmental risk derived by metals, since adverse effects are related only to the biologically available forms of these elements. The knowledge of bioavailability can decrease the uncertainties in evaluating exposure in human and ecological risk assessment. At the same time, the efficiency of remediation treatments could be greatly influenced by availability of the contaminants. Consideration of the bioavailability processes at contaminated sites could be useful in site-specific risk assessment: the fraction of mobile metals, instead of total content should be provided as estimates of metal exposure. Moreover, knowledge of the chemical forms of heavy metals in soils is a critical component in the evaluation of applicability of different remediation technologies such as phytoremdiation or soil washing.

  2. Remediation of hazardous waste sites by heap leaching

    International Nuclear Information System (INIS)

    Samani, Z.; Hanson, A.; Dwyer, B.

    1994-01-01

    Efforts are being made to devise technologies and treatment systems to remediate contaminated soil-on site without generating significant wastes for off-site disposal. Heap leaching, a technique used extensively in the mining industry, has been investigated as a method for remediation of hazardous chemical contamination of the vadose zone. In the mining industry, metal-bearing ore is excavated and mounded on a pad. The metals are removed by passing a special leaching solution through the ore. In this study, the removal of chromium(VI) from the New Mexico soils (sand, sandy loam, and clay) using heap leaching was evaluated at a column scale. The heap leaching study demonstrated greater than 99% removal of Cr(VI) from all three soils using tap water as the leaching agent. (author) 13 figs., 5 tabs., 21 refs

  3. Current activities handbook: formerly utilized sites remedial action program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1981-02-27

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the activities each of the thirteen state legislatures potentially affected by the Formerly Utilized Sites Remedial Action Program. It contains a description of the state legislative procedural rules and a schedule of each legislative session; a summary of pending relevant legislation; the name and telephone number of legislative and state agency contacts; and the full text of all bills identified.

  4. Current activities handbook: formerly utilized sites remedial action program

    International Nuclear Information System (INIS)

    1981-01-01

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the activities each of the thirteen state legislatures potentially affected by the Formerly Utilized Sites Remedial Action Program. It contains a description of the state legislative procedural rules and a schedule of each legislative session; a summary of pending relevant legislation; the name and telephone number of legislative and state agency contacts; and the full text of all bills identified

  5. Environmental assessment of remedial action at the Mexican Hat uranium mill tailings site, Mexican Hat, Utah

    International Nuclear Information System (INIS)

    1987-10-01

    This document assesses the environmental impacts of the proposed remedial action at the Mexican Hat uranium mill tailings site located on the Navajo Reservation in southern Utah. The site covers 235 acres and contains 69 acres of tailings and several of the original mill structures. Remedial action must be performed in accordance with standards and with the concurrence of the US Nuclear Regulatory Commission and the Navajo Nation. The proposed action is to stabilize the tailings within the present tailings site by consolidating the tailings and associated contaminated soils into a recontoured pile. A radon barrier of compacted earth would be constructed over the pile, and various erosion control measures would be taken to assure the long-term stability of the pile. The no action alternative is also assessed in this document. 240 refs., 12 figs., 20 tabs

  6. Development of site remediation technologies in European countries

    International Nuclear Information System (INIS)

    Nunno, T.J.; Hyman, J.A.; Pheiffer, T.

    1988-01-01

    Site remediation is a pressing issue in European countries due to limited availability of land. Therefore, much progress is being made in the development of effective technologies for remediating contaminated sites. The purpose of this program was to investigate the most successful and innovative technologies for potential application into US markets. This EPA-sponsored project was based on a 9-month research effort which identified 95 innovative technologies in use or being researched in foreign countries. The most promising technologies were studied in-depth through personal interviews with the engineers who research and apply these technologies, and tours of laboratory models and full-scale installations. The most successful full-scale technologies investigated were developed in Holland, West Germany and Belgium. These technologies include vacuum extraction of hydrocarbons from soil, in situ washing of cadmium-polluted soil, rotating biocontractors for treating pesticides in ground water, high-temperature slagging incineration of low-level radioactive wastes, in situ steam stripping, and a number of landfarming and soil washing operations. The paper provides description of 13 site remediation techniques that have shown such promise in laboratory studies or in practice to warrant consideration of their use in the US

  7. Environmental assessment of remedial action at the Gunnison Uranium Mill Tailings Site, Gunnison, Colorado

    International Nuclear Information System (INIS)

    Bachrach, A.; Hoopes, J.; Morycz, D.; Bone, M.; Cox, S.; Jones, D.; Lechel, D.; Meyer, C.; Nelson, M.; Peel, R.; Portillo, R.; Rogers, L.; Taber, B.; Zelle, P.; Rice, G.

    1984-12-01

    This document assesses and compares the environmental impacts of various alternatives for remedial action at the Gunnison uranium of mill tailings site located 0.5 miles south of Gunnison, Colorado. The site covers 56 acres and contains 35 acres of tailings, 2 of the original mill buildings and a water tower. The Uranium Mill Tailings Radiation Control of Act of 1978 (UMTRCA), Public Law 95-604, authorizes the US Department of Energy to clean up the site to reduce the potential health impacts associated with the residual radioactive materials remaining at the site and at associated [vicinity] properties off the site. The US Environmental Protection Agency promulgated standards for the remedial actions (40 CFR 192). Remedial actions must be performed in accordance with these standards and with the occurrence of the Nuclear Regulatory Commission. Four alternatives have been addressed in this document. The first alternative is to consolidate the tailings and associated contaminated soils into a recontoured pile on the southern portion of the existing site. A radon barrier of silty clay would be constructed over the pile and various erosion control measures would be taken to assure the long-term integrity of the pile. Two other alternatives which involve moving the tailings to new locations are assessed in this document. These alternatives generally involve greater short-term impacts and are more costly but would result in the tailings being stabilized in a location farther from the city of Gunnison. The no action alternative is also assessed

  8. Environmental assessment of remedial action at the Gunnison Uranium Mill Tailings Site, Gunnison, Colorado. [UMTRA Project

    Energy Technology Data Exchange (ETDEWEB)

    Bachrach, A.; Hoopes, J.; Morycz, D. (Jacobs Engineering Group, Inc., Pasadena, CA (USA)); Bone, M.; Cox, S.; Jones, D.; Lechel, D.; Meyer, C.; Nelson, M.; Peel, R.; Portillo, R.; Rogers, L.; Taber, B.; Zelle, P. (Weston (Roy F.), Inc., Washington, DC (USA)); Rice, G. (Sergent, Hauskins and Beckwith (USA))

    1984-12-01

    This document assesses and compares the environmental impacts of various alternatives for remedial action at the Gunnison uranium of mill tailings site located 0.5 miles south of Gunnison, Colorado. The site covers 56 acres and contains 35 acres of tailings, 2 of the original mill buildings and a water tower. The Uranium Mill Tailings Radiation Control of Act of 1978 (UMTRCA), Public Law 95-604, authorizes the US Department of Energy to clean up the site to reduce the potential health impacts associated with the residual radioactive materials remaining at the site and at associated (vicinity) properties off the site. The US Environmental Protection Agency promulgated standards for the remedial actions (40 CFR 192). Remedial actions must be performed in accordance with these standards and with the occurrence of the Nuclear Regulatory Commission. Four alternatives have been addressed in this document. The first alternative is to consolidate the tailings and associated contaminated soils into a recontoured pile on the southern portion of the existing site. A radon barrier of silty clay would be constructed over the pile and various erosion control measures would be taken to assure the long-term integrity of the pile. Two other alternatives which involve moving the tailings to new locations are assessed in this document. These alternatives generally involve greater short-term impacts and are more costly but would result in the tailings being stabilized in a location farther from the city of Gunnison. The no action alternative is also assessed.

  9. Environmental compliance at U.S. Department of Energy FUSRAP (Formerly Utilized Sites Remedial Action Program) sites

    International Nuclear Information System (INIS)

    Liedle, S.D.; Clemens, B.W.

    1988-01-01

    With the promulgation of the Superfund Amendments and Reauthorization Act (SARA), federal facilities were required to comply with the Comprehensive Environmental Response Compensation and Liability Act (CERCLA) in the same manner as any non-government entity. This presented challenges for the Department of Energy (DOE) and other federal agencies involved in remedial action work because there are many requirements under SARA that overlap other laws requiring DOE compliance, e.g., the National Environmental Policy Act (NEPA). This paper outlines the options developed to comply with CERCLA and NEPA as part of active, multi-site remedial action program. The program, the Formerly Utilized Sites Remedial Action Program (FUSRAP), was developed to identify, clean up, or control sites containing residual radioactive or chemical contamination as a result of the nation's early development of nuclear power. During the Manhattan Project, uranium was extracted from ores and resulted in mill concentrates, purified metals, and waste products that were transported for use or disposal at other locations. Figure 1 shows the steps for producing uranium metal during the Manhattan Project. As a result of these activities materials, equipment, buildings, and land became contaminated, primarily with naturally occurring radionuclides. Currently, FUSRAP includes 29 sites; three are on the Environmental Protection Agency's (EPA's) National Priorities List (NPL) of hazardous waste sites

  10. Final audit report of remedial action construction at the UMTRA project site Rifle, Colorado. Rev. 1

    International Nuclear Information System (INIS)

    1997-01-01

    This final audit report summarizes the assessments performed by the U.S. Department of Energy (DOE) Environmental Restoration Division (ERD) and its Technical Assistance Contractor (TAC) of remedial action compliance with approved plans, specifications, standards, and 40 CFR Part 192 at the Rifle, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project site. Remedial action construction was directed by the Remedial Action Contractor (RAC)

  11. Risk-based remediation of polluted sites: A critical perspective.

    Science.gov (United States)

    Kuppusamy, Saranya; Venkateswarlu, Kadiyala; Megharaj, Mallavarapu; Mayilswami, Srinithi; Lee, Yong Bok

    2017-11-01

    Sites contaminated with chemical pollutants represent a growing challenge, and remediation of such lands is of international concern. Risk-based land management (RBLM) is an emerging approach that integrates risk assessment practices with more traditional site-specific investigations and remediation activities. Developing countries are yet to adopt RBLM strategies for remediation. RBLM is considered to be practical, scientifically defensible and cost-efficient. However, it is inherently limited by: firstly, the accuracy of risk assessment models used; secondly, ramifications of the fact that they are more likely to leave contamination in place; and thirdly, uncertainties involved and having to consider the total concentrations of all contaminants in soils that overestimate the potential risks from exposure to the contaminants. Consideration of contaminant bioavailability as the underlying basis for risk assessment and setting remediation goals of those contaminated lands that pose a risk to environmental and human health may lead to the development of a more sophisticated risk-based approach. However, employing the bioavailability concept in RBLM has not been extensively studied and/or legalized. This review highlights the extent of global land contamination, and the concept of risk-based assessment and management of contaminated sites including its advantages and disadvantages. Furthermore, the concept of bioavailability-based RBLM strategy has been proposed, and the challenges of RBLM and the priority areas for future research are summarized. Thus, the present review may help achieve a better understanding and successful implementation of a sustainable bioavailability-based RBLM strategy. Copyright © 2017 Elsevier Ltd. All rights reserved.

  12. Remedial action plan and site conceptual design for stabilization of the inactive uranium mill tailings site at Ambrosia Lake, New Mexico

    International Nuclear Information System (INIS)

    Matthews, M.L.; Mitzelfelt, R.

    1991-11-01

    This Remedial Action Plan (RAP) has been developed to serve a dual purpose. It presents the series of activities that is proposed by the US Department of Energy (DOE) to stabilize and control radioactive materials at the inactive Phillips/United Nuclear uranium processing site designated as the Ambrosia Lake site in McKinley County, New Mexico. It also serves to document the concurrence of both State of New Mexico and the US Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by the DOE and the state and concurrence by NRC, becomes Appendix B of the Cooperative Agreement

  13. Remedial action plan and site design for stabilization of the inactive uranium mill tailings site at Lowman, Idaho: Remedial action selection report for the Lowman UMTRA project site, Idaho

    International Nuclear Information System (INIS)

    Matthews, M.L.; Nagel, J.

    1991-09-01

    The inactive uranium mill tailings site near Lowman, Idaho, was designated as one of 24 abandoned uranium tailings sites to be remediated by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). The UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE's remedial action plan and certify that the remedial action complies with the standards promulgated by the US Environmental Protection Agency (EPA). The remedial action plan (RAP), which includes this remedial action selection report (RAS), has been developed to serve a two-fold purpose. First, it describes the activities that are proposed by the DOE to accomplish long-term stabilization and control of residual radioactive materials at the inactive uranium processing site near Lowman, Idaho. Second, this document and the remainder of the RAP, upon concurrence and execution by the DOE, the State of Idaho, and the NRC, becomes Appendix B of the Cooperative Agreement (No. DE-FC04-85AL20535) between the DOE and the State of Idaho

  14. Nuclear power: Siting and safety

    International Nuclear Information System (INIS)

    Openshaw, S.

    1986-01-01

    By 2030, half, or even two-thirds, of all electricity may be generated by nuclear power. Major reactor accidents are still expected to be rare occurrences, but nuclear safety is largely a matter of faith. Terrorist attacks, sabotage, and human error could cause a significant accident. Reactor siting can offer an additional, design-independent margin of safety. Remote geographical sites for new plants would minimize health risks, protect the industry from negative changes in public opinion concerning nuclear energy, and improve long-term public acceptance of nuclear power. U.K. siting practices usually do not consider the contribution to safety that could be obtained from remote sites. This book discusses the present trends of siting policies of nuclear power and their design-independent margin of safety

  15. Environmental assessment of remedial action at the Tuba City uranium mill tailings site, Tuba City, Arizona

    Energy Technology Data Exchange (ETDEWEB)

    None

    1986-11-01

    This document assesses and compares the environmental impacts of various alternatives for remedial action at the Tuba City uranium mill tailings site located approximately six miles east of Tuba City, Arizona. The site covers 105 acres and contains 25 acres of tailings and some of the original mill structures. The Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), Public Law 95-604, authorizes the US Department of Energy to clean up the site to reduce the potential health impacts associated with the residual radioactive materials remaining at the site and at associated properties off the site. The US Environmental Protection Agency promulgated standards for the remedial actions (40 CFR Part 192). Remedial actions must be performed in accordance with these standards and with the concurrence of the Nuclear Regulatory Commission. The proposed action is to stabilize the tailings at their present location by consolidating the tailings and associated contaminated materials into a recontoured pile. A radon barrier would be constructed over the pile and various erosion control measures would be taken to assure the long-term stability of the pile. Another alternative which would involve moving the tailings to a new location is also assessed in this document. This alternative would generally involve greater short-term impacts and costs but would result in stabilization of the tailings at a more remote location. The no action alternative is also assessed in this document.

  16. Environmental assessment of remedial action at the Tuba City uranium mill tailings site, Tuba City, Arizona

    International Nuclear Information System (INIS)

    1986-11-01

    This document assesses and compares the environmental impacts of various alternatives for remedial action at the Tuba City uranium mill tailings site located approximately six miles east of Tuba City, Arizona. The site covers 105 acres and contains 25 acres of tailings and some of the original mill structures. The Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), Public Law 95-604, authorizes the US Department of Energy to clean up the site to reduce the potential health impacts associated with the residual radioactive materials remaining at the site and at associated properties off the site. The US Environmental Protection Agency promulgated standards for the remedial actions (40 CFR Part 192). Remedial actions must be performed in accordance with these standards and with the concurrence of the Nuclear Regulatory Commission. The proposed action is to stabilize the tailings at their present location by consolidating the tailings and associated contaminated materials into a recontoured pile. A radon barrier would be constructed over the pile and various erosion control measures would be taken to assure the long-term stability of the pile. Another alternative which would involve moving the tailings to a new location is also assessed in this document. This alternative would generally involve greater short-term impacts and costs but would result in stabilization of the tailings at a more remote location. The no action alternative is also assessed in this document

  17. Formerly Utilized Sites Remedial Action Program environmental compliance assessment checklists

    Energy Technology Data Exchange (ETDEWEB)

    Levine, M.B.; Sigmon, C.F.

    1989-09-29

    The purpose of the Environmental Compliance Assessment Program is to assess the compliance of Formerly Utilized Site Remedial Action Program (FUSRAP) sites with applicable environmental regulations and Department of Energy (DOE) Orders. The mission is to identify, assess, and decontaminate sites utilized during the 1940s, 1950s, and 1960s to process and store uranium and thorium ores in support of the Manhattan Engineer District and the Atomic Energy Commission. To conduct the FUSRAP environmental compliance assessment, checklists were developed that outline audit procedures to determine the compliance status of the site. The checklists are divided in four groups to correspond to these regulatory areas: Hazardous Waste Management, PCB Management, Air Emissions, and Water Discharges.

  18. Formerly Utilized Sites Remedial Action Program environmental compliance assessment checklists

    International Nuclear Information System (INIS)

    Levine, M.B.; Sigmon, C.F.

    1989-01-01

    The purpose of the Environmental Compliance Assessment Program is to assess the compliance of Formerly Utilized Site Remedial Action Program (FUSRAP) sites with applicable environmental regulations and Department of Energy (DOE) Orders. The mission is to identify, assess, and decontaminate sites utilized during the 1940s, 1950s, and 1960s to process and store uranium and thorium ores in support of the Manhattan Engineer District and the Atomic Energy Commission. To conduct the FUSRAP environmental compliance assessment, checklists were developed that outline audit procedures to determine the compliance status of the site. The checklists are divided in four groups to correspond to these regulatory areas: Hazardous Waste Management, PCB Management, Air Emissions, and Water Discharges

  19. Plasma filtering techniques for nuclear waste remediation.

    Science.gov (United States)

    Gueroult, Renaud; Hobbs, David T; Fisch, Nathaniel J

    2015-10-30

    Nuclear waste cleanup is challenged by the handling of feed stocks that are both unknown and complex. Plasma filtering, operating on dissociated elements, offers advantages over chemical methods in processing such wastes. The costs incurred by plasma mass filtering for nuclear waste pretreatment, before ultimate disposal, are similar to those for chemical pretreatment. However, significant savings might be achieved in minimizing the waste mass. This advantage may be realized over a large range of chemical waste compositions, thereby addressing the heterogeneity of legacy nuclear waste. Copyright © 2015 Elsevier B.V. All rights reserved.

  20. Environmental remediation of an Alstom grid industrial site (France) - 59270

    International Nuclear Information System (INIS)

    Romero, Stephanie

    2012-01-01

    ALSTOM Grid is the project owner of the remediation of a former industrial site, located in Saint-Ouen, north of Paris. The industrial activity (power transformer production) started in 1921 and stopped in 2006. The type of pollution is linked with the former activity. It's an organic pollution: hydrocarbon, PCB and chlorinated volatile organic compounds. The clean-up concerns soil and groundwater. The main specificity of the project is that the remediation is operated inside the existing industrial buildings which must be kept in place and restituted to the owner after the works. The treatment of soil requires excavating soil up to 9 m deep (1 m under the level of the groundwater) inside the buildings. As a consequence, some impressive devices were set up to ensure the stability of the buildings during the clean-up, like support structures of the foundations and strengthening of the building fronts. In the same time, it has to be pointed out that great diversity of clean-up actions is performed on the site: the soil is excavated to be treated on site (bioremediation or chemical treatment) or off site. The treatment of groundwater consists of pumping the oil staying on the surface and oxidizing the dissolved pollution. This project is probably the first experience of this scale in France with multi-contaminated soil and groundwater decontamination in keeping and reinforcing the existing buildings. (authors)

  1. Remedial design of the Fultz Landfill Site, Byesville, Ohio

    International Nuclear Information System (INIS)

    Rajaram, V.; Riesing, R.; Bloom, T.

    1994-01-01

    The Fultz Landfill Superfund (Fultz) site is a 30-acre hazardous waste landfill located near Byesville, Ohio. The site is approximately 75 miles east of Columbus and 3 miles southwest of Cambridge, the largest city in Guernsey County, Ohio. The landfill is situated on the north slope of a ridge that overlies abandoned coal mines in the Upper Freeport Coal seam. The north half of the landfill lies in an unreclaimed strip mine in the Upper Freeport Coal seam, where saturated portions of surface mine spoils and natural soils form the ''shallow aquifer''. The south half of the landfill lies 40 to 50 feet (ft.) above an abandoned, flooded deep mine in the same coal seam. The flooded deep mine forms an aquifer referred to as the ''coal mine aquifer''. This paper presents the results of design studies completed by PRC Environmental Management, Inc. (PRC), during 1993, and the remedial design (RD) of the components specified by the US Environmental Protection Agency (EPA) Record of Decision (ROD) for the Fultz site (EPA 1991). The remedy specified in the ROD includes a multilayer landfill cap that is compliant with Resource Conservation and Recovery Act (RCRA) Subtitle C guidelines, a leachate collection and groundwater extraction and treatment system, and stabilizing mine voids underlying the southern portion of the site. Vinyl chloride is the only contaminant exceeding a maximum contaminant limit (MCL) in the coal mine aquifer

  2. An analysis on the effect of the electrokinetic remediation of a soil around decommissioning site by reagent

    International Nuclear Information System (INIS)

    Kim, Gye-Nam; Jung, Yun-Ho; Lee, Jung-Joon; Moon, Jei-Kwon; Jung, Chong-Hun; Lee, Kune-Woo; Chung, Un-Soo

    2008-01-01

    Most nuclear facility sites have been contaminated by the leakage of a radioactive waste-solution due to the corrosion of concrete and pipes by a long-term operation of waste-solution tanks and connection pipes set up in an underground around nuclear power plant. Also, a great volume of radioactive soil has been generated due to the loss of radioactive contaminants during a long-term operation of nuclear facilities and nuclear operational accidents. Even if people's health has been threatened by a dissolution of radionuclide from such a contaminated soil, the existing soil remediation technologies have a lower removal efficiency for radionuclide. Therefore, it is necessary to develop a soil remediation technology suitable for the contamination characteristics of national nuclear facility sites

  3. Perspectives on innovative characterization and remediation technologies for contaminated sites

    International Nuclear Information System (INIS)

    Kovalick, W.W. Jr.

    2002-01-01

    Contaminated soil and groundwater have been the subject of legislative attention in the U.S. for about 20 years. Major strides in implementing cleanup programs have been accomplished. From complex abandoned hazardous waste sites to underground petroleum storage tanks to (more recently) Brownfields redevelopment, much assessment and remediation work have been carried out. This paper describes some of the data on the kinds of contamination, media, and technologies deployed to deal with problems at these sites. In addition, it highlights technology partnerships that have evolved to demonstrate and verify site measurement and clean-up technologies and to assure a more robust set of clean-up options. Finally, the advent of the Internet has increased access to a considerable body of publicly available information on the cost and performance of these technologies that might be of interest. (author)

  4. IAEA Coordinates International Mission on Remediation of Areas Off-site Fukushima Daiichi NPP

    International Nuclear Information System (INIS)

    2011-01-01

    Full text: The International Atomic Energy Agency (IAEA) will dispatch an international expert mission to Japan to assist the country in its planning to remediate the areas off-site from the Fukushima Daiichi Nuclear Power Plant. Following a request by the Government of Japan, the mission, comprising 12 international and IAEA experts from several countries, will visit Japan between 7 and 15 October 2011 under the leadership of Mr. Juan Carlos Lentijo, General Director for Radiation Protection at Spain's nuclear regulatory authority. The team will go to several locations in the Fukushima Prefecture and conduct meetings in Tokyo with Japanese officials to: Provide assistance to Japan in its plans to manage remediation efforts; Review the country's remediation strategies, plans and work; and Share its findings with the international community. The IAEA mission will provide an opportunity for the international experts to exchange views with the Japanese authorities involved in the decontamination effort and other interested parties. It will also provide an opportunity for the IAEA to take stock of lessons learned from this important decontamination initiative. At the end of the mission a preliminary summary report will be provided to the Government of Japan and be made publically available. The team is also planning to hold a press briefing at the end of the mission. The final report of the mission will be presented to the Government in the month following the conclusion of the mission. Background The accident at Fukushima Daiichi Nuclear Power Plant has led to the radiological contamination of large areas. The Government of Japan has been formulating a strategy and plans to implement countermeasures to remediate these areas. The IAEA organized an International Fact Finding Expert Mission Of The Fukushima Daiichi Nuclear Power Plant Accident Following The Great East Japan Earthquake And Tsunami, which was held between 24 May and 2 June 2011. The current mission is a

  5. Remedial action plan and site design for stabilization of the inactive uranium mill tailings site at Tuba City, Arizona

    International Nuclear Information System (INIS)

    1989-08-01

    This Remedial Action Plan (RAP) has been developed to serve a threefold purpose. It presents the series of activities which are proposed by the US Department of Energy (DOE) to accomplish long-term stabilization and control of radioactive materials at the inactive uranium processing site near Tuba City, Arizona. It provides a characterization of the present conditions of the site. It also serves to document the concurrence of the Navajo Nation, the Hopi Tribe, US Bureau of Indian Affairs (BIA), and the US Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by DOE, the Navajo Nation, and the Hopi Tribe, and concurrence by NRC, becomes Appendix B of the Cooperative Agreement. Following the introduction, contents are as follows: Section 2.0 presents the EPA standards, including a discussion of their objectives. Section 3.0 summarizes the present site characteristics and provides a definition of site-specific problems. Section 4.0 is the site design for the proposed action. Section 5.0 summarizes the plan for ensuring environmental, health, and safety protection for the surrounding community and the on-site workers. Section 6.0 presents a detailed listing of the responsibilities of the project participants. Section 7.0 describes the features of the long-term surveillance and maintenance plan. Section 8.0 presents the quality assurance aspects of the project. Section 9.0 documents the ongoing activities to keep the public informed and participating in the project

  6. Final audit report of remedial action construction at the UMTRA Project Site, Gunnison, Colorado. Revision 0

    International Nuclear Information System (INIS)

    1996-01-01

    The final audit report for remedial action at the Gunnison, Colorado Uranium Mill Tailings Remedial Action (UMTRA) Project site consists of a summary of the radiological surveillances/audits, quality assurance (QA) in-process surveillances, and QA remedial action close-out inspections performed by the U.S. Department of Energy (DOE) and the Technical Assistance Contractor (TAC); and on-site construction reviews (OSCR) performed by the U.S. Nuclear Regulatory Commission (NRC). Two radiological surveillances and four radiological audits were performed at the Gunnison site. The surveillances were performed on 16 to 19 September 1992 and 28 June to 1 July 1993. The radiological audits were performed on 4 to 7 October 1993; 13 to 16 June 1994; 19 to 22 September 1994 and 10 to 12 July 1995. The surveillances and audits resulted in 79 observations. Thirty-four of the observations raised DOE concerns that were resolved on the site or through subsequent corrective action. All outstanding issues were closed on 12 July 1995. The radiological surveillances and audits are discussed in Section 2.0 of this report. Ten QA in-process surveillances were performed at the Gunnison UMTRA Project site. The surveillances were performed on 24 to 25 September 1992, 7 to 9 July 1993, 29 October 1993, 27 to 28 June 1994, 31 October to 1 November 1994, 19 to 20 June 1 995, 20 to 21 July 1995, 17 to 18 August 1995, 20 September 1995, and 11 to 13 October 1995. The surveillances resulted in 100 observations. Six observations contained recommendations that required responses from the Remedial Action Contractor (RAC). Ninety-five observations contained a recommendation that required no response. All outstanding issues were closed on 8 January 1996. The QA in-process surveillances are discussed in Section 3.0 of this report

  7. Final audit report of remedial action construction at the UMTRA Project Falls City, Texas, site

    International Nuclear Information System (INIS)

    1995-05-01

    This final audit report for the Falls City, Texas, Uranium Mill Tailings Remedial Action Project site summarizes the radiological audits and the quality assurance (QA) in-process surveillances, audits, and final close-out inspection performed by the U.S. Department of Energy (DOE) and Technical Assistance Contractor (TAC). It also summarizes U.S. Nuclear Regulatory Commission (NRC) surveillances. One radiological audit and three radiological surveillances were performed at the Falls City site. These surveillances and audit, which resulted in 31 observations, focused primarily on processing site activities and were performed on the following dates: 3-6 August 1992, 29-30 October 1992, 22-26 March 1993, and 1-3 November 1993. All outstanding radiological issues were closed out at the completion of the construction activities. Six QA in-process surveillances, which resulted in 71 observations, were performed at the Falls City site on the following dates: 22-24 July 1992, 23-25 November 1992, 17-19 May 1993, 16-18 August 1993, 13-15 October 1993, and 2-4 February 1994. All outstanding issues were closed out with the February surveillance on 3 March 1994. The DOE/TAC remedial action close-out inspections of the Falls City site, which resulted in 56 observations, were conducted 9-10 June 1994 and 26 July 1994. The inspections were closed out on 26 January 1995. The NRC performed three on-site construction reviews (OSCR), resulting in seven observations of remedial action construction activities that occurred during site visits. The OSCRs were performed 9 December 1992, 12 May 1993, and 25 October 1993. Since all audit and surveillance observations and recommendations have been closed out, this final audit report segment of the site certification process is complete

  8. Missouri state information handbook formerly utilized sites remedial action program

    International Nuclear Information System (INIS)

    1980-01-01

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and rgulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Missouri. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; a description of the organization and structure of local governments affected by remedial action at the St. Louis area sites; a summary of relevant local ordinances and regulations; an identification of relevant public interest groups; a list of radio stations, television stations and newspapers that provide public information to the St. Louis area or to Jefferson City; and the full text of relevant statutes and regulations

  9. Missouri State information handbook: formerly utilized sites remedial action program

    International Nuclear Information System (INIS)

    1980-01-01

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Missouri. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature chairmen, and a summary of recent relevant legislative action; a description of the organization and structure of local governments affected by remedial action at the St. Louis area sites; a summary of relevant local ordinances and regulations; an identification of relevant public interest groups; a list of radio stations, television stations, and newspapers that provide public information to the St. Louis area or to Jefferson City; and the full text of relevant statutes and regulations

  10. Unique Construction and Social Experiences in Residential Remediation Sites - 13423

    Energy Technology Data Exchange (ETDEWEB)

    Jung, Paul; Scarborough, Rebecca [Sevenson Environmental Services, Inc. 2749 Lockport Road, Niagara Falls, NY 14305 (United States)

    2013-07-01

    Sevenson Environmental Services, Inc., (Sevenson) has performed several radiological remediation projects located in residential urban areas. Over the course of these projects, there has been a wide variety of experiences encountered from construction related issues to unique social situations. Some of the construction related issues included the remediation of interior basements where contaminated material was located under the footers of the structure or was used in the mortar between cinder block or field stone foundations. Other issues included site security, maintaining furnaces or other utilities, underpinning, backfilling and restoration. In addition to the radiological hazards associated with this work there were occupational safety and industrial hygiene issues that had to be addressed to ensure the safety and health of neighboring properties and residents. The unique social situations at these job sites have included arson, theft/stolen property, assault/battery, prostitution, execution of arrest warrants for residents, discovery of drugs and paraphernalia, blood borne pathogens, and unexploded ordnance. Some of these situations have become a sort of comical urban legend throughout the organization. One situation had historical significance, involving the demolition of a house to save a tree older than the Declaration of Independence. All of these projects typically involve the excavation of early 20. century items such as advertisement signs, various old bottles (milk, Listerine, perfume, whisky) and other miscellaneous common trash items. (authors)

  11. Estimating remediation costs for the Montclair radium superfund sites

    International Nuclear Information System (INIS)

    Turner, M.J.

    1995-01-01

    The Montclair/West Orange and Glen Ridge Superfund Sites, located in Essex County, NJ, are contaminated to varying degrees with radioactive materials. The waste originated from radium processing facilities prevalent in the area during the early 1900s. The design for remediation of these sites is managed by Bechtel National, Inc. on behalf of the United States Army Corps of Engineers, Kansas City District, which administers the project through an interagency agreement with the US Environmental Protection Agency (EPA). Design efforts for the project began in 1990. A portion of the scope, which is the topic of this article, was preparing the remediation costs estimates. These estimates were to be prepared from the detailed design packages; the Corps of Engineers required that the estimates were prepared using the Micro Computer-Aided Cost Estimating System (MCACES). This article discusses the design methods used, provides an overview of MCACES, and discusses the structure and preparation of the cost estimate and its uses. However, the main focus of the article is the methods used to generate the required project-specific cost estimate format for this project. 6 figs

  12. Missouri State information handbook: formerly utilized sites remedial action program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-12-31

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Missouri. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature chairmen, and a summary of recent relevant legislative action; a description of the organization and structure of local governments affected by remedial action at the St. Louis area sites; a summary of relevant local ordinances and regulations; an identification of relevant public interest groups; a list of radio stations, television stations, and newspapers that provide public information to the St. Louis area or to Jefferson City; and the full text of relevant statutes and regulations.

  13. Unique Construction and Social Experiences in Residential Remediation Sites - 13423

    International Nuclear Information System (INIS)

    Jung, Paul; Scarborough, Rebecca

    2013-01-01

    Sevenson Environmental Services, Inc., (Sevenson) has performed several radiological remediation projects located in residential urban areas. Over the course of these projects, there has been a wide variety of experiences encountered from construction related issues to unique social situations. Some of the construction related issues included the remediation of interior basements where contaminated material was located under the footers of the structure or was used in the mortar between cinder block or field stone foundations. Other issues included site security, maintaining furnaces or other utilities, underpinning, backfilling and restoration. In addition to the radiological hazards associated with this work there were occupational safety and industrial hygiene issues that had to be addressed to ensure the safety and health of neighboring properties and residents. The unique social situations at these job sites have included arson, theft/stolen property, assault/battery, prostitution, execution of arrest warrants for residents, discovery of drugs and paraphernalia, blood borne pathogens, and unexploded ordnance. Some of these situations have become a sort of comical urban legend throughout the organization. One situation had historical significance, involving the demolition of a house to save a tree older than the Declaration of Independence. All of these projects typically involve the excavation of early 20. century items such as advertisement signs, various old bottles (milk, Listerine, perfume, whisky) and other miscellaneous common trash items. (authors)

  14. Remedial technology for contaminated natural gas dehydrator sites

    International Nuclear Information System (INIS)

    Prosen, B.J.; Korreck, W.M.; Armstrong, J.M.

    1991-01-01

    Ground water and soil contamination at many of Michigan's oil and gas well sites has been attributed to natural gas dehydration processes. Since water was once thought to be the only by-product from the dehydration process, condensate from the process was discharged directly to the ground for several years. This condensate was later found to contain benzene, toluene, ethyl-benzene, and xylenes (BTEX), and the process of discharging condensate to the ground was stopped. Many oil and gas well sites had become impacted from the process during this time. Although condensate is no longer discharged to the ground, soil and water contamination still remains at many of these sites. In the last few years, the Michigan Department of Natural Resources has targeted over 90 well sites for assessment of contamination associated with gas dehydration. The results of many of these assessments indicate that soil and ground water have been impacted, and the State of Michigan has mandated cleanup of these sites. Remedial technologies which have been used to contain and/or clean up the sites include excavation and product removal, soil venting, purge and treat, and enhanced biodegradation. This paper is a discussion of the technology, implementation, and results from each of these methods

  15. Fifth international conference on radioactive waste management and environmental remediation -- ICEM '95: Proceedings. Volume 2: Management of low-level waste and remediation of contaminated sites and facilities

    International Nuclear Information System (INIS)

    Slate, S.; Baker, R.; Benda, G.

    1995-01-01

    The objective of this conference is the broad international exchange of information on technologies, operations, management approaches, economics, and public policies in the critical areas of radioactive waste management and environmental remediation. The ICEM '95 technical program includes four parallel program tracks: Low/intermediate-level waste management; High-level waste, spent fuel, nuclear material management; Environmental remediation and facility D and D; and Major institutional issues in environmental management. Volume 2 contains approximately 200 papers divided into the following topical sections: Characterization of low and intermediate level waste; Treatment of low and intermediate level waste; LLW disposal and near-surface contaminant migration; Characterization and remediation of contaminated sites; and Decontamination and decommissioning technologies and experience. Papers have been processed separately for inclusion on the data base

  16. Chairperson's Summary, International Expert Meeting on Decommissioning and Remediation after a Nuclear Accident

    International Nuclear Information System (INIS)

    Larsson, Carl Magnus

    2013-01-01

    History has clearly demonstrated, and it has repeated itself in the events and aftermath of March 2011, that a major nuclear accident, just as any other major accident, not only affects public and environmental health, but in addition causes a wide range of direct and indirect effects. These include evacuation and relocation; social unrest; indirect health effects related to anxiety, radiological stigma and symptoms of a post-traumatic nature; as well as effects on property, the economy, public policy and politics. All of these factors influence the setting of targets for decommissioning and remediation; this is often an iterative process involving consideration of the legal framework, finances, processes and methodology and technology. Importantly, decommissioning and remediation is carried out in close interaction with stakeholders, of which the public (affected by both the accident and the recovery from its consequences) form an important part. Today, we have substantial knowledge about the impact of major nuclear accidents as well as a wealth of experience - good and sometimes less so - from a range of decommissioning and remediation projects following nuclear accidents. There are also a number of lessons to be learned from decommissioning and remediation of other legacy sites that have not originated from nuclear accidents but where the problems encountered are of similar nature. Experiences have over the years been discussed in many fora, including a number of IAEA initiatives and UNSCEAR reviews of scientific information on health and environmental effects of accidents and legacies of comparable nature. It is timely to discuss this knowledge in relation to the Fukushima Daiichi accident, to provide guidance to future actions aimed at strengthening our understanding of the exposure situation, and our ability to successfully carry out decommissioning of facilities and environmental remediation after a nuclear accident. (author)

  17. Remediation of acid tar sludge at a Superfund site

    International Nuclear Information System (INIS)

    Grajczak, P.; McManus, R.W.

    1995-01-01

    An old refinery site in Texas was safely remediated a year before schedule and for 25% less than original engineering estimates through aggressive project management and the application of an innovative design. The authors planned to solidify the petroleum acid sludge and place it in an on-site, constructed landfill. Careful evaluation of available solidification technologies lead to selection of the DCR process, a patented stabilization process far waste treatment. The technology offered low expansion factor, low reagent to waste ratio, and low cost. The process also proved to be efficient and safe, implemented using a custom-designed, transportable treatment unit. High treatment rates and continuous uninterrupted operation resulted in early completion of the waste treatment task

  18. Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Rifle, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    1992-02-01

    This appendix assesses the present conditions and data gathered about the two inactive uranium mill tailings sites near Rifle, Colorado, and the designated disposal site six miles north of Rifle in the area of Estes Gulch. It consolidates available engineering, radiological, geotechnical, hydrological, meteorological, and other information pertinent to the design of the Remedial Action Plan (RAP). The data characterize conditions at the mill, tailings, and disposal site so that the Remedial Action Contractor (RAC) may complete final designs for the remedial actions.

  19. Tank waste remediation system nuclear criticality safety program management review

    International Nuclear Information System (INIS)

    BRADY RAAP, M.C.

    1999-01-01

    This document provides the results of an internal management review of the Tank Waste Remediation System (TWRS) criticality safety program, performed in advance of the DOE/RL assessment for closure of the TWRS Nuclear Criticality Safety Issue, March 1994. Resolution of the safety issue was identified as Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) Milestone M-40-12, due September 1999

  20. Monitored Natural Attenuation as a Remediation Strategy for Nuclear Power Plant Applications

    Science.gov (United States)

    Kim, K.; Bushart, S.

    2009-12-01

    A NRC Information Notice (IN 2006-13) was produced to inform holders of nuclear operating licenses “of the occurrence of radioactive contamination of ground water at multiple facilities due to undetected leakage from facility structures, systems, or components (SSCs) that contain or transport radioactive fluids” so that they could consider actions, as appropriate, to avoid similar problems. To reinforce their commitment to environmental stewardship the nuclear energy industry has committed to improving management of situations that have the potential to lead to the inadvertent release of radioactive fluids. This Industry Groundwater Protection Initiative, finalized in June 2007 as [NEI 07-07], calls for implementation and improvement of on-site groundwater monitoring programs and enhanced communications with stakeholders and regulators about situations related to inadvertent releases. EPRI developed its Groundwater Protection Program to provide the nuclear energy industry with the technical support needed to implement the Industry Groundwater Initiative. An objective of the EPRI Groundwater Protection Program is to provide the nuclear industry with technically sound guidance for implementing and enhancing on-site groundwater monitoring programs. EPRI, in collaboration with the EPRI Groundwater Protection Committee of utility members, developed the EPRI Groundwater Protection Guidelines for Nuclear Power Plants (EPRI Report 1015118, November 2007), which provides site-specific guidance for implementing a technically sound groundwater monitoring program. The guidance applies a graded approach for nuclear plants to tailor a technically effective and cost efficient groundwater monitoring program to the site’s hydrogeology and risk for groundwater contamination. As part of the Groundwater Protection Program, EPRI is also investigating innovative remediation technologies for addressing low-level radioactive contamination in soils and groundwater at nuclear power

  1. Remedial action selection report Maybell, Colorado, site. Final report

    International Nuclear Information System (INIS)

    1996-12-01

    The Maybell uranium mill tailings site is 25 miles (mi) (40 kilometers [km]) west of the town of Craig, Colorado, in Moffat County, in the northwestern part of the state. The unincorporated town of Maybell is 5 road mi (8 km) southwest of the site. The site is 2.5 mi (4 km) northeast of the Yampa River on relatively flat terrain broken by low, flat-topped mesas. U.S. Highway 40 runs east-west 2 mi (3.2 km) south of the site. The designated site covers approximately 110 acres (ac) (45 hectares [ha]) and consists of a concave-shaped tailings pile and rubble from the demolition of the mill buildings buried in the former mill area. The site is situated between Johnson Wash to the east and Rob Pit Mine to the west. Numerous reclaimed and unreclaimed mines are in the immediate vicinity. Aerial photographs (included at the end of this executive summary) show evidence of mining activity around the Maybell site. Contaminated materials at the Maybell processing site include the tailings pile, which has an average depth of 20 feet (ft) (6 meters [ml]) and contains 2.8 million cubic yards (yd 3 ) (2.1 million cubic meters [m 3 ]) of tailings. The former mill processing area is on the north side of the site and contains 20,000 yd 3 (15,000 m 3 ) of contaminated demolition debris. Off-pile contamination is present and includes areas adjacent to the tailings pile, as well as contamination dispersed by wind and surface water flow. The volume of off-pile contamination to be placed in the disposal cell is 550,000 yd 3 (420,000 m 3 ). The total volume of contaminated materials to be disposed of as part of the remedial action is estimated to be 3.37 million yd 3 (2.58 million m 3 )

  2. Remediation of polluted sites. The risks, liabilities and costs; Rehabilitation de sites pollues. Quels risques? Quelles responsabilites? Quels couts?

    Energy Technology Data Exchange (ETDEWEB)

    Paquot, A. [Ministere de l' Ecologie et du Developpement Durable 75 - Paris (France); Darmendrail, D. [BRGM, 75 - Paris (France); Mensah, J. [Etablissement public foncier Nord Pas de Calais, 59 - Lille (France); Costil, J. [BURGEAP, 69 - Lyon (France); Carbon, S. [Gaz de France (GDF), 75 - Paris (France); Gervaise, Y. [SGS Multilab, 51 - Rouen (France); Bonin, H. [GRS Valtech, 69 - Rilleux-la-Pape (France); Delfaud, L. [Projenor, 59 - Lille (France); Croze, V. [ICF Environnement, 92 - Gennevilliers (France); Ricour, J. [ANTEA, des solutions globales, durables et rentables, 45 - Orleans (France); Langlois, P.

    2003-10-01

    This conference deals with the following topics: the mastery of the economic, regulation, juridical and contractual framework; liabilities and financing distribution between the intervenors; the diagnostic cost; the financial security in the sites acquisition and social right transfer; the efficient technologies of sites remediation; the communication near the site in remediation. (A.L.B.)

  3. International Experts' Meeting on Decommissioning and Remediation after a Nuclear Accident. Presentations

    International Nuclear Information System (INIS)

    2013-01-01

    Against the backdrop of the accident at TEPCO's Fukushima Daiichi nuclear power plant in March 2011, the Director General of the International Atomic Energy Agency (IAEA) convened the IAEA Ministerial Conference on Nuclear Safety in Vienna, Austria, in June 2011. The Conference adopted a Ministerial Declaration which, inter alia, requested the Director General to prepare a draft Action Plan covering all the relevant aspects relating to nuclear safety, emergency preparedness and response, and radiation protection of people and the environment, as well as the relevant international legal framework. On 22 September 2011, the IAEA General Conference unanimously endorsed the draft IAEA Action Plan on Nuclear Safety approved by the Board of Governors. The Action Plan sets out a comprehensive programme of work, in 12 major areas, to strengthen nuclear safety worldwide. Under one of these areas, headed 'Enhance transparency and effectiveness of communication and improve dissemination of information', the IAEA Secretariat was requested to organize an International Experts' Meeting (IEM) on decommissioning, cleanup and remediation of nuclear facilities and contaminated lands after a nuclear accident. This IEM was organized in response to that request. The IEM focussed on the complex technical, societal, environmental and economic issues that need to be considered for decommissioning and remediation activities after a nuclear accident, specifically after the emergency exposure situation of an accident has been declared ended. The objective of the IEM is to assist Member States to prepare for and to be able to manage the consequences resulting from a nuclear accident. The meeting highlighted the specific short term and long term issues that may need to be addressed during decommissioning of facilities and remediation of the off-site environment affected by a nuclear accident. It is of interest to a wide range of experts, such as decision makers, regulators, operators

  4. Environmental assessment of remedial action at the Slick Rock uranium mill tailings sites Slick Rock, Colorado

    International Nuclear Information System (INIS)

    1993-06-01

    The Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA) authorized the US Department of Energy (DOE) to clean up two uranium mill tailings processing sites near Slick Rock, Colorado, in San Miguel County. The purpose of the cleanup is to reduce the potential health effects associated with the radioactive materials remaining on the sites and on vicinity properties (VP) associated with the sites. The US Environmental Protection Agency (EPA) promulgated standards for the UMTRCA that contained measures to control the contaminated materials and to protect the groundwater from further degradation. Remedial actions at the Slick Rock sites must be performed in accordance with these standards and with the concurrence of the US Nuclear Regulatory Commission (NRC)

  5. Remediation of a former fuel loading site using phytoremediation

    Energy Technology Data Exchange (ETDEWEB)

    Kotecha, P [Jacques Whitford Environment Ltd., Mont-Royal, PQ (Canada)

    2001-07-01

    The degradation and/or removal of pollutants from a contaminated medium is caused, mediated, and/or assisted by vegetation is defined as phytoremediation. It is a method widely used for the degradation, removal, and/or stabilisation of soils, sludges, sediments, or wastewaters. Some of the substances that can be cleaned up using phytoremediation are heavy metals, radionucleotides, petroleum hydrocarbons, energetics, chlorinated hydrocarbons, biocides, metalloids, nutrients, salts, and volatile organic contaminants. A former fuel loading site currently owned by Ultramar was remediated by Jacques Whitford Environment Limited using phytoremediation. A gasoline loading facility, a fuel loading facility, and a berm along an adjacent creek were all located at the site. All buildings and petroleum equipment had been removed in the mid-1980s, and the site is now vacant. The first phase involved the revegetation of the site with a phytoremediation grass cover and hybrid poplars, then the tree roots were allowed to infiltrate the ground to act as intake paths for contaminated water, the tree roots acted as a barrier to the contaminants headed to the river. Some of the advantages of phytoremediation are: low cost technique that can be applied using solar-powered ecotechnology in situ, wide applicability, involves minimum site disruption, has wide public acceptance, produces were few by-products requiring disposal, if any, and the harvested material can be easily disposed of in cases involving plant harvesting. The outcome of the project was also presented.

  6. Florida state information handbook: formerly utilized sites remedial action program

    International Nuclear Information System (INIS)

    1981-01-01

    This volume is one of a series produced under contract with DOE, Office of Nuclear Waste Management, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the federal and state levels, the pertinent programs they administer, each affected state legislature, and current federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Florida. It contains a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations

  7. Florida state information handbook: formerly utilized sites remedial action program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1981-02-27

    This volume is one of a series produced under contract with DOE, Office of Nuclear Waste Management, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the federal and state levels, the pertinent programs they administer, each affected state legislature, and current federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Florida. It contains a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

  8. Engineered wetlands for on-site groundwater remediation

    International Nuclear Information System (INIS)

    Wallace, S.; Davis, B.M.

    2008-01-01

    Engineered wetlands have been touted as an emerging technology for the in situ remediation of hydrocarbon-contaminated soil and water. They incorporate a horizontal subsurface flow gravel bed reactor lined with impermeable liners, and are equipped with forced bed aeration systems that enhance oxygen delivery to the wetland's aerobic micro-organisms. Engineered wetlands generally emphasize specific characteristics of wetland ecosystems to improve treatment capacities. Design parameters include biodegradation rate coefficients, flowrate, hydraulic residence time plus influent and required effluent concentrations. This paper described the installation of an engineered wetland system at a former British Petroleum (BP) refinery in Wyoming where a pipeline terminal generated contact wastewater containing benzene, toluene, ethylbenzene and xylene (BTEX) and ammonia. The wetland treatment system was designed to treat 6000 m 3 of contaminated ground water per day and has been in operation since May 2003. It was concluded that engineered wetlands can offer long-term solutions to site remediation challenges. 16 refs., 3 tabs., 6 figs

  9. Horizontal directional drilling: a green and sustainable technology for site remediation.

    Science.gov (United States)

    Lubrecht, Michael D

    2012-03-06

    Sustainability has become an important factor in the selection of remedies to clean up contaminated sites. Horizontal directional drilling (HDD) is a relatively new drilling technology that has been successfully adapted to site remediation. In addition to the benefits that HDD provides for the logistics of site cleanup, it also delivers sustainability advantages, compared to alternative construction methods.

  10. Evaluation of Final Radiological Conditions at Areas of the Niagara Falls Storage Site Remediated under the Formerly Utilized Sites Remedial Action Program -12184

    Energy Technology Data Exchange (ETDEWEB)

    Clayton, Christopher [U.S Department of Energy Office of Legacy Management, Washington, DC; Kothari, Vijendra [U.S Department of Energy Office of Legacy Management, Morgantown, West Virginia; Starr, Ken [U.S Department of Energy Office of Legacy Management, Westminster, Colorado; Widdop, Michael; Gillespie, Joey [SM Stoller Corporation, Grand Junction, Colorado

    2012-02-26

    The U. S. Department of Energy (DOE) methods and protocols allow evaluation of remediation and final site conditions to determine if remediated sites remain protective. Two case studies are presented that involve the Niagara Falls Storage Site (NFSS) and associated vicinity properties (VPs), which are being remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP). These properties are a part of the former Lake Ontario Ordnance Works (LOOW). In response to stakeholders concerns about whether certain remediated NFSS VPs were putting them at risk, DOE met with stakeholders and agreed to evaluate protectiveness. Documentation in the DOE records collection adequately described assessed and final radiological conditions at the completed VPs. All FUSRAP wastes at the completed sites were cleaned up to meet DOE guidelines for unrestricted use. DOE compiled the results of the investigation in a report that was released for public comment. In conducting the review of site conditions, DOE found that stakeholders were also concerned about waste from the Separations Process Research Unit (SPRU) at the Knolls Atomic Power Laboratory (KAPL) that was handled at LOOW. DOE agreed to determine if SPRU waste remained at that needed to be remediated. DOE reviewed records of waste characterization, historical handling locations and methods, and assessment and remediation data. DOE concluded that the SPRU waste was remediated on the LOOW to levels that pose no unacceptable risk and allow unrestricted use and unlimited exposure. This work confirms the following points as tenets of an effective long-term surveillance and maintenance (LTS&M) program: Stakeholder interaction must be open and transparent, and DOE must respond promptly to stakeholder concerns. DOE, as the long-term custodian, must collect and preserve site records in order to demonstrate that remediated sites pose no unacceptable risk. DOE must continue to maintain constructive relationships with the U

  11. New Jersey state information handbook: Formerly Utilized Sites Remedial Action Program

    International Nuclear Information System (INIS)

    1980-01-01

    Under the implied authority of the Atomic Energy Act of 1954, as amended, radiological surveys and research work has been conducted to determine radiological conditions at former MED/AEC sites. As of this time, 31 sites in 13 states have been identified that require or may require remedial action. This volume is one of a series produced under contract with DOE, Office of Nuclear Waste Management, by POLITECH CORPORATION to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of New Jersey. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations. The loose-leaf format used in these volumes will allow the material to be updated periodically as the Remedial Action Program progresses

  12. New Jersey state information handbook: Formerly Utilized Sites Remedial Action Program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-10-31

    Under the implied authority of the Atomic Energy Act of 1954, as amended, radiological surveys and research work has been conducted to determine radiological conditions at former MED/AEC sites. As of this time, 31 sites in 13 states have been identified that require or may require remedial action. This volume is one of a series produced under contract with DOE, Office of Nuclear Waste Management, by POLITECH CORPORATION to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of New Jersey. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations. The loose-leaf format used in these volumes will allow the material to be updated periodically as the Remedial Action Program progresses.

  13. ANALYSIS OF REMEDIATION PROCESS OF THE GROUDWATER COTAMINATION IN AN ILLEGAL DUMPING SITE

    Science.gov (United States)

    Nishida, Norikazu; Furuichi, Toru; Ishii, Kazuei

    Among on-site remediation technologies applied to illegal dumping sites, a technology to remedy contaminated groundwater without removal of the dumped waste is expected to provide a great opportunity to fulfill a societal need due to its economic advantage compared to removal of all waste. However heterogeneously-distributed waste makes the remedial process difficult. In this study, an in situflushing technology was applied to an illegal dumping site in Kuwana city, Mie, in order to remedy groundwater contaminated with several volatile organic compounds (VOCs) within five years. The key to successfully achieve the target was to conduct a series of advanced remediation processes; introducing a new indicator by which multiple VOCs can be estimated integratelly, monitoring the progress of remediation with a contour map of VOC concentration as well as the weighted averages of the concentration derived from the indicator, pinpointing residual contaminants area, reexamining the plan, and taking additional steps that promote further remediation.

  14. Illinois state information handbook: formerly utilized sites remedial action program

    International Nuclear Information System (INIS)

    1980-01-01

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Illinois. It contains a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; the full text of relevant statutes and regulations

  15. Illinois State information handbook: formerly utilized sites remedial action program

    International Nuclear Information System (INIS)

    1980-01-01

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Illinois. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations

  16. Massachusetts state information handbook: formerly utilized sites remedial action program

    International Nuclear Information System (INIS)

    1981-01-01

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of Massachusetts. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; the full text of relevant statutes and regulations

  17. Iowa state information handbook: formerly utilized sites remedial action program

    International Nuclear Information System (INIS)

    1981-01-01

    This volume is one of a series produced under contract with the DOE, By Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of Iowa. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; the full test of relevant statutes and regulations

  18. Pennsylvania state information handbook: formerly utilized sites remedial action program

    International Nuclear Information System (INIS)

    1980-01-01

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and State levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Pennsylvania. It contains a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations

  19. Massachusetts state information handbook: formerly utilized sites remedial action program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1981-02-09

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of Massachusetts. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; the full text of relevant statutes and regulations.

  20. Environmental Audit, Weldon Spring Site Remedial Action Project

    International Nuclear Information System (INIS)

    1991-06-01

    This report documents the results of the Environmental Baseline Audit of DOE's Weldon Spring Site Remedial Action Project (WSSRAP), located in St. Charles, Missouri. The purpose of the Environmental Baseline Audit is to provide the Secretary of Energy with concise information pertaining to the following issues: (1) compliance status with applicable environmental regulations (with the exception of National Environmental Policy Act [NEPA] requirements); (2) adherence to best management and accepted industry practices; (3) DOE vulnerabilities and liabilities associated with compliance status, environmental conditions, and management practices; (4) root causes of compliance findings (CF) and best management practice (BMP) findings; (5) adequacy of environmental management programs and organizations; and (6) noteworthy practices. This information will assist DOE in determining patterns and trends in environmental compliance, BMPs, and root causes, and will provide the information necessary for line management to take appropriate corrective actions. 6 figs., 11 tabs

  1. California state information handbook: formerly utilized sites remedial action program

    International Nuclear Information System (INIS)

    1981-01-01

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of California. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; the full text of relevant statutes and regulations

  2. Iowa state information handbook: formerly utilized sites remedial action program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1981-02-09

    This volume is one of a series produced under contract with the DOE, By Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of Iowa. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; the full test of relevant statutes and regulations.

  3. California state information handbook: formerly utilized sites remedial action program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1981-02-09

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of California. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; the full text of relevant statutes and regulations.

  4. Pennsylvania state information handbook: formerly utilized sites remedial action program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-12-31

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and State levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Pennsylvania. It contains a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

  5. Oregon state information handbook: formerly utilized sites remedial action program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-12-31

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Oregon. It contains a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

  6. Pennsylvania state information handbook formerly utilized sites remedial action program

    International Nuclear Information System (INIS)

    1980-01-01

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Pennsylvania. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations

  7. Oregon state information handbook: formerly utilized sites remedial action program

    International Nuclear Information System (INIS)

    1980-01-01

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Oregon. It contains a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations

  8. Oregon state information handbook formerly utilized sites remedial action program

    International Nuclear Information System (INIS)

    1980-01-01

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administater, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Oregon. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations

  9. Maryland state information handbook: formerly utilized sites remedial action program

    International Nuclear Information System (INIS)

    1980-01-01

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and State levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Maryland. It contains a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations

  10. Ohio state information handbook: formerly utilized sites remedial action program

    International Nuclear Information System (INIS)

    1981-01-01

    This volume is one of a series produced under contract with the DOE, by POLITECH CORPORATION to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of Ohio. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; the full test of relevant statutes and regulations

  11. Ohio state information handbook: formerly utilized sites remedial action program

    Energy Technology Data Exchange (ETDEWEB)

    1981-02-09

    This volume is one of a series produced under contract with the DOE, by POLITECH CORPORATION to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of Ohio. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; the full test of relevant statutes and regulations.

  12. Oregon state information handbook formerly utilized sites remedial action program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-12-31

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administater, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Oregon. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

  13. LCA of contaminated site remediation - integration of site-specific impact assessment of local toxic impacts

    DEFF Research Database (Denmark)

    Lemming, Gitte; Hauschild, Michael Zwicky; Chambon, Julie Claire Claudia

    2011-01-01

    impacts have typically been assessed using site-generic characterization models representing a continental scale and excluding the groundwater compartment. Soil contaminants have therefore generally been assigned as emissions to surface soil or surface water compartments. However, such site-generic...... assessments poorly reflect the fate of frequent soil contaminants such as chloroethenes as they exclude the groundwater compartment and assume that the main part escapes to the atmosphere. Another important limitation of the generic impact assessment models is that they do not include the formation......The environmental impacts from remediation can be divided into primary and secondary impacts. Primary impacts cover the local impacts associated with the on-site contamination, whereas the secondary impacts are impacts on the local, regional and global scale generated by the remediation activities...

  14. Remediation of the Wells G & H Superfund Site, Woburn, Massachusetts.

    Science.gov (United States)

    Bair, E Scott; Metheny, Maura A

    2002-01-01

    Remediation of ground water and soil contamination at the Wells G & H Superfund Site, Woburn, Massachusetts, uses technologies that reflect differences in hydrogeologic settings, concentrations of volatile organic compounds (VOCs), and costs of treatment. The poorly permeable glacial materials that overlie fractured bedrock at the W.R. Grace property necessitate use of closely spaced recovery wells. Contaminated ground water is treated with hydrogen peroxide and ultraviolet (UV) oxidation. At UniFirst, a deep well completed in fractured bedrock removes contaminated ground water, which is treated by hydrogen peroxide, UV oxidation, and granular activated carbon (GAC). The remediation system at Wildwood integrates air sparging, soil-vapor extraction, and ground water pumping. Air stripping and GAC are used to treat contaminated water; GAC is used to treat contaminated air. New England Plastics (NEP) uses air sparging and soil-vapor extraction to remove VOCs from the unsaturated zone and shallow ground water. Contaminated air and water are treated using separate GAC systems. After nine years of operation at W.R. Grace and UniFirst, 30 and 786 kg, respectively, of VOCs have been removed. In three years of operation, 866 kg of VOCs have been removed at Wildwood. In 15 months of operation, 36 kg of VOCs were removed at NEP. Characterization work continues at the Olympia Nominee Trust, Whitney Barrel, Murphy Waste Oil, and Aberjona Auto Parts properties. Risk assessments are being finalized that address heavy metals in the floodplain sediments along the Aberjona River that are mobilized from the Industri-Plex Superfund Site located a few miles upstream.

  15. DDG Opening Remarks [International Experts' Meeting on Decommissioning and Remediation after a Nuclear Accident

    International Nuclear Information System (INIS)

    Bychkov, Alexander

    2013-01-01

    Any significant nuclear accident results in challenges in terms of the decommissioning of the damaged facilities and in many cases also in the remediation of contaminated areas outside the site boundary. These challenges include the application of appropriate technological and human resources, public involvement and the allocation of the necessary financing, which is of course considerable. There can be no real future for nuclear energy unless the global community is convinced that the legacies associated with its use can be addressed satisfactorily, whether in connection with facilities contaminated as a result of a nuclear or radiological accident, or indeed large facilities used for research or other purposes during the developmental phase of the nuclear industry. It is evident that decommissioning and remediation projects, especially for nuclear facilities and sites after an accident, will continue to be undertaken for many decades, over which time it is expected that technological developments will occur. It will be important that the new and more sophisticated technologies of the future are applied to these activities. However we should also be aware that in case of dealing with accident-damaged facilities there is a great deal to be learnt from the experience from the past 60 years and this meeting is focused directly on reviewing and distilling that experience

  16. Nuclear waste disposal site

    International Nuclear Information System (INIS)

    Mallory, C.W.; Watts, R.E.; Sanner, W.S. Jr.; Paladino, J.B.; Lilley, A.W.; Winston, S.J.; Stricklin, B.C.; Razor, J.E.

    1988-01-01

    This patent describes a disposal site for the disposal of toxic or radioactive waste, comprising: (a) a trench in the earth having a substantially flat bottom lined with a layer of solid, fluent, coarse, granular material having a high hydraulic conductivity for obstructing any capillary-type flow of ground water to the interior of the trench; (b) a non-rigid, radiation-blocking cap formed from a first layer of alluvium, a second layer of solid, fluent, coarse, granular material having a high hydraulic conductivity for blocking any capillary-type flow of water between the layer of alluvium and the rest of the cap, a layer of water-shedding silt for directing surface water away from the trench, and a layer of rip-rap over the silt layer for protecting the silt layer from erosion and for providing a radiation barrier; (c) a solidly-packed array of abutting modules of uniform size and shape disposed in the trench and under the cap for both encapsulating the wastes from water and for structurally supporting the cap, wherein each module in the array is slidable movable in the vertical direction in order to allow the array of modules to flexibly conform to variations in the shape of the flat trench bottom caused by seismic disturbances and to facilitate the recoverability of the modules; (d) a layer of solid, fluent, coarse, granular materials having a high hydraulic conductivity in the space between the side of the modules and the walls of the trench for obstructing any capillary-type flow of ground water to the interior of the trench; and (e) a drain and wherein the layer of silt is sloped to direct surface water flowing over the cap into the drain

  17. Final audit report of remedial action construction at the UMTRA Project, Grand Junction, Colorado, processing site

    International Nuclear Information System (INIS)

    1995-02-01

    This final audit report (FAR) for remedial action at the Grand Junction, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project processing site consists of a summary of the radiological surveillances/ audits, the quality assurance (QA) in-process surveillances, and the QA final close-out inspection performed by the US Department of Energy (DOE) and Technical Assistance Contractor (TAC). The FAR also summarizes other surveillances performed by the US Nuclear Regulatory Commission (NRC). To summarize, a total of one finding and 127 observations were noted during DOE/TAC audit and surveillance activities. The NRC noted general site-related observations during the OSCRs. Follow-up to responses required from MK-Ferguson for the DOE/TAC finding and observations indicated that all issues related to the Grand Junction processing site were resolved and closed out to the DOE's satisfaction. The NRC OSCRs resulted in no issues related to the Grand Junction processing site requiring a response from MK-Ferguson

  18. G. Nuclear power plant siting

    International Nuclear Information System (INIS)

    1976-01-01

    The selection of a site for a nuclear power site is a complex process involving considerations of public health and safety, engineering design, economics, and environmental impact. Although policies adopted in various countries differ in some details, a common philosophy usually underlies the criteria employed. The author discusses the basic requirements, as they relate to New Zealand, under the headings: engineering and economics; health and safety; environmental factors

  19. Prioritization and accelerated remediation of groundwater contamination in the 200 Areas of the Hanford Site, Washington

    International Nuclear Information System (INIS)

    Wittreich, C.D.; Ford, B.H.

    1993-04-01

    The Hanford Site, operated by the US Department of Energy (DOE), occupies about 1,450 km 2 (560 mi 2 ) of the southeastern part of Washington State north of the confluence of the Yakima and Columbia Rivers. The Hanford Site is organized into numerically designated operational areas. The 200 Areas, located near the center of the Hanford Site, encompasses the 200 West, East and North Areas and cover an area of over 40 km 2 . The Hanford Site was originally designed, built, and operated to produce plutonium for nuclear weapons using production reactors and chemical reprocessing plants. Operations in the 200 Areas were mainly related to separation of special nuclear materials from spent nuclear fuel and contain related chemical and fuel processing and waste management facilities. Large quantities of chemical and radioactive waste associated with these processes were often disposed to the environment via infiltration structures such as cribs, ponds, ditches. This has resulted in over 25 chemical and radionuclide groundwater plumes, some of which have reached the Columbia River. An Aggregate Area Management Study program was implemented under the Hanford Federal Facility Agreement and Consent Order to assess source and groundwater contamination and develop a prioritized approach for managing groundwater remediation in the 200 Areas. This included a comprehensive evaluation of existing waste disposal and environmental monitoring data and the conduct of limited field investigations (DOE-RL 1992, 1993). This paper summarizes the results of groundwater portion of AAMS program focusing on high priority contaminant plume distributions and the groundwater plume prioritization process. The objectives of the study were to identify groundwater contaminants of concern, develop a conceptual model, refine groundwater contaminant plume maps, and develop a strategy to expedite the remediation of high priority contaminants through the implementation of interim actions

  20. Status of activities on the inactive uranium mill tailings sites remedial action program. Office of the Assistant Secretary for Environment

    International Nuclear Information System (INIS)

    1981-04-01

    This report on the status of the Office of Environment's program for inactive uranium mill tailings sites is an analysis of the current status and a forecast of future activities of the Office of Environment. The termination date for receipt of information was September 30, 1980. Aerial radiological surveys and detailed ground radiological assessments of properties within the communities in the vicinity of the designated processing sites in Canonsburg, Pennsylvania, Salt Lake City, Utah, and Boise, Idaho led to the designation of an initial group of vicinity properties for remedial action. The potential health effects of the residual radioactive materials on or near these properties were estimated, and the Assistant Secretary for Environment recommended priorities for performing remedial action to the Department's Assistant Secretary for Nuclear Energy. In designating these properties and establishing recommended priorities for performing remedial action, the Office of Environment consulted with the Environmental Protection Agency, the Nuclear Regulatory Commission, representatives from the affected State and local governments, and individual property owners. After notifying the Governors of each of the affected States and the Navajo Nation of the Secretary of Energy's designation of processing sites within their areas of jurisdiction and establishment of remedial action priorities, a Sample Cooperative Agreement was developed by the Department in consultation with the Nuclear Regulatory Commission and provided to the affected States and the Navajo Nation for comments. During September 1980, a Cooperative Agreement with the Commonwealth of Pennsylvania for the designated Canonsburg processing site was executed by the Department. It is anticipated that a Cooperative Agreement between the State of Utah and the Department to perform remedial actions at the designated Salt Lake City site will be executed in the near future

  1. Status of activities on the inactive uranium mill tailings sites remedial action program. Office of the Assistant Secretary for Environment

    Energy Technology Data Exchange (ETDEWEB)

    1981-04-01

    This report on the status of the Office of Environment's program for inactive uranium mill tailings sites is an analysis of the current status and a forecast of future activities of the Office of Environment. The termination date for receipt of information was September 30, 1980. Aerial radiological surveys and detailed ground radiological assessments of properties within the communities in the vicinity of the designated processing sites in Canonsburg, Pennsylvania, Salt Lake City, Utah, and Boise, Idaho led to the designation of an initial group of vicinity properties for remedial action. The potential health effects of the residual radioactive materials on or near these properties were estimated, and the Assistant Secretary for Environment recommended priorities for performing remedial action to the Department's Assistant Secretary for Nuclear Energy. In designating these properties and establishing recommended priorities for performing remedial action, the Office of Environment consulted with the Environmental Protection Agency, the Nuclear Regulatory Commission, representatives from the affected State and local governments, and individual property owners. After notifying the Governors of each of the affected States and the Navajo Nation of the Secretary of Energy's designation of processing sites within their areas of jurisdiction and establishment of remedial action priorities, a Sample Cooperative Agreement was developed by the Department in consultation with the Nuclear Regulatory Commission and provided to the affected States and the Navajo Nation for comments. During September 1980, a Cooperative Agreement with the Commonwealth of Pennsylvania for the designated Canonsburg processing site was executed by the Department. It is anticipated that a Cooperative Agreement between the State of Utah and the Department to perform remedial actions at the designated Salt Lake City site will be executed in the near future.

  2. Radiological criteria for the remediation of sites for spent fuel and radioactive waste storage in the Russian Northwest.

    Science.gov (United States)

    Shandala, N K; Sneve, M K; Titov, A V; Smith, G M; Novikova, N Ya; Romanov, V V; Seregin, V A

    2008-12-01

    In the 1960s, two technical bases of the Northern Fleet were created in Northwest Russia, at Andreeva Bay in the Kola Peninsula and Gremikha village on the coast of the Barents Sea. They maintained nuclear submarines, performing receipt and storage of radioactive waste and spent nuclear fuel, and are now designated sites of temporary storage (STSs). An analysis of the radiation situation at these sites demonstrates that substantial long-term remediation work will be required after the removal of the waste and spent nuclear fuel. Regulatory guidance is under development to support this work. Having in mind modern approaches to guaranteeing radiation safety, the primary regulatory focus is on a justification of dose constraints for determining acceptable residual contamination which might lead to exposure to workers and the public. For these sites, four principal options for remediation have been considered-renovation, conversion, conservation and liquidation. This paper describes a system of recommended dose constraints and derived control levels formulated for each option. The unconditional guarantee of long-term radioecological protection provides the basis for criteria development. Non-exceedance of these dose constraints and control levels implies compliance with radiological protection objectives related to the residual contamination. Dose reduction below proposed dose constraint values must also be carried out according to the optimisation principle. The developed criteria relate to the condition of the facilities and the STS areas after the termination of remediation activities. The proposed criteria for renovation, conversion, conservation and liquidation are entirely within the dose limits adopted in Russia for the management of man-made radiation sources, and are consistent with ICRP recommendations and national practice in other countries. The proposed criteria for STS remediation and new industrial (non-radiation-hazardous) facilities and buildings on

  3. Modernized approach for the remediation of produced water impacted sites

    Energy Technology Data Exchange (ETDEWEB)

    Knafla, A.; Carey, J. [Equilibrium Environmental Inc., Calgary, AB (Canada); Stokes, D. [Talisman Energy Inc., Calgary, AB (Canada); Carey, J.; Sunita, R.

    2007-10-01

    This article described a project conducted to remediate a site in southeast Saskatchewan polluted by releases of produced water-related salts and boron during the 1960s. A risk assessment was conducted to define endpoints based on equivalent land capability and the potential for health risks. Multiple toxic stressors complicated the assessment, and limited published data were available regarding cumulative and interactive effects. Boron concentrations exceeded recommended guidelines, and the poor permeability of surface soils caused reduced infiltration and increased run-off. An automated pumping system was designed to allow for variable leachate removal rates depending on groundwater elevations. A distillation system using moderately saline water from a nearby source was designed to offset scaling that occurred due to high calcium sulfate concentrations. Results of the project suggested that the combination of groundwater control, improving surface soil permeability, establishing plant growth, and available water for infiltration resulted in significant improvements in soil quality and an approach towards land capability endpoints. The use of moderately saline irrigation water led to significant improvements in the soil salinity of heavily impacted areas. Test plots were then formed to test the efficacy of manure and calcium nitrate as a remediation technique. Test plots were treated with Roundup, and calcium nitrate before seeding, or with manure and calcium nitrate followed by rototilling and seeding. In treated plots, plant growth was observed for barley, alkali grass, wheatgrasses, orchard grass, rye, and alfalfa. Greater plant height and yield was visible in the manure and calcium nitrate treated plots. A decrease in boron topsoil concentrations was also observed. Average bioconcentration factors was calculated as 29.5. It was concluded that the method can provide a 20 per cent annual soil concentration reduction rate. 6 figs.

  4. Problems of developing remedial strategy for the uranium ore processing legacy site Pridneprovsky Chemical Plant site (Dneprodzerginsk, Ukraine)

    International Nuclear Information System (INIS)

    Riazantsev, V.; Bugai, D.; Skalskyy, A.; Tkachenko, E.

    2014-01-01

    In this paper we present results of works and studies carried out in the frame of ongoing national and international projects aimed at developing the remedial strategy for the Soviet era legacy uranium production site Pridneprovsky Chemical Plant, Dneprodzerginsk, Ukraine. The site includes several uranium mill tailings, contaminated buildings, ore storage grounds and other contaminated facilities. Taking into account the necessity to implement provisions of the new IAEA standards (Radiation Protection and Safety of Radiation Sources: International Basic Safety Standards, No. GSR Part 3 (Interim) and others) as well as the provisions of the ICRP 103 publication, the State Nuclear Regulatory Inspectorate Ukraine developed the draft of the new licensing requirements for activities of uranium ores processing.

  5. Optimisation of occupational exposures during site remediation at WISMUT

    International Nuclear Information System (INIS)

    Schmidt, P.; Wolf, F.

    2004-01-01

    Since 1991 the national corporation WISMUT GmbH has been charged with the rehabilitation of the sites of former Uranium mining and milling in East Germany. Since decommissioning and site remediation are carried out at places with enhanced dose rates and high concentrations of airborne radioactivity (Rn-222, long-lived alpha emitters), a large part of the employees is classified as occupationally exposed radiation workers. Thus, in 2002, 1,073 workers were engaged with relevant works in radiation protection areas aboveground (radiation exposed workers of category B; mean effective dose: 0.3 mSv; maximum dose: 2.2 mSv), and 514 workers still prepared by underground activities the flooding of the Uranium mines (category A; mean effective dose: 0.9 mSv; maximum effective dose: 4.9 mSv). The paper presents the measures taken by WISMUT to optimise the occupational exposure. The need for implementing appropriate ALARA methods in the field of occupational exposure is last but not least caused by the fact that for a number of employees the integral exposure over the total working life time has exceeded already the 400 mSv figure. (orig.)

  6. Remediation and restoration of a thorium and radium contaminated site

    International Nuclear Information System (INIS)

    Drury, N.C.

    1995-01-01

    This paper describes the remediation and restoration of approximately 130,000 square metres of derelict land in East London, contaminated with radioactive and chemical substances. The land had been the location of a chemical plant operated under different owners for about ninety years. The plant was demolished in the 1970's and lay derelict for approximately 10 years. This site was bought by developers in the late 1980's with the intention of constructing a residential complex, and therefore had to be cleared of contamination such that it could be released for unrestricted use. This paper provides an overview of the initial radiological status of the site, the methodology and safety measures adopted for the decontamination operations with emphasis placed on the various radiological monitoring and sampling regimes and techniques employed for: a) providing on-going evaluation of the decontamination progress, b) the radiological characterisation of the waste arisings in order to identify various available disposal routes, c) ensuring safety for both operators and members of the public during decontamination operations, d) ensuring compliance with the radiological end-point agreed with the authorising department (HMIP) as the final stage of the restoration. (author) 5 figs

  7. Remediation and restoration of a thorium and radium contaminated site

    Energy Technology Data Exchange (ETDEWEB)

    Drury, N.C. [WS Atkins Consultants, Epsom Surrey (United Kingdom)

    1995-12-31

    This paper describes the remediation and restoration of approximately 130,000 square metres of derelict land in East London, contaminated with radioactive and chemical substances. The land had been the location of a chemical plant operated under different owners for about ninety years. The plant was demolished in the 1970`s and lay derelict for approximately 10 years. This site was bought by developers in the late 1980`s with the intention of constructing a residential complex, and therefore had to be cleared of contamination such that it could be released for unrestricted use. This paper provides an overview of the initial radiological status of the site, the methodology and safety measures adopted for the decontamination operations with emphasis placed on the various radiological monitoring and sampling regimes and techniques employed for: (a) providing on-going evaluation of the decontamination progress, (b) the radiological characterisation of the waste arisings in order to identify various available disposal routes, (c) ensuring safety for both operators and members of the public during decontamination operations, (d) ensuring compliance with the radiological end-point agreed with the authorising department (HMIP) as the final stage of the restoration. (author) 5 figs.

  8. Cancer mortality around nuclear sites

    International Nuclear Information System (INIS)

    Hill, C.; LaPlanche, A.

    1991-01-01

    Studies (including that of Gardner) of cancer mortality around individual nuclear sites in Britain show an excess of childhood leukemia near such sites. These have been attributed to radioactive discharges, increased radiation doses and radiation doses to the fathers of affected children. However, no such excess has been found in studies in other countries including France, Canada and the USA where similar radiation doses could have been received. Several explanations of this discrepancy are reviewed. It is possible that results from the small UK samples may be due to chance. A difference in external and internal doses for reprocessing plant workers may also be a factor. The possibility of a viral infection for leukemia spreading in new town populations is also mentioned. Whilst the studies in other countries are reassuring, the childhood leukemia excesses found in Britain round nuclear sites are still unexplained. (UK)

  9. RCRA Facility Investigation/Remedial Investigation Report for the Grace Road Site (631-22G)

    Energy Technology Data Exchange (ETDEWEB)

    Palmer, E.

    1998-10-02

    This report summarizes the activities and documents the results of a Resource Conservation and Recovery Act Facility Investigation/Remedial Investigation conducted at Grace Road Site on the Savannah River Site near Aiken, South Carolina.

  10. RCRA Facility Investigation/Remedial Investigation Report for the Grace Road Site (631-22G)

    International Nuclear Information System (INIS)

    Palmer, E.

    1998-01-01

    This report summarizes the activities and documents the results of a Resource Conservation and Recovery Act Facility Investigation/Remedial Investigation conducted at Grace Road Site on the Savannah River Site near Aiken, South Carolina

  11. Overview of Chromium Remediation Technology Evaluations At The Hanford Site, Richland Washington

    Science.gov (United States)

    Morse, J. G.; Hanson, J. P.

    2009-12-01

    This paper will present an overview of the different technologies and the results to date for optimizing and improving the remediation of Cr+6 in the soil and groundwater at the Hanford Site. The Hanford Site, par of the U.S. Department of Energy's (DOE)nuclear weapons complex, encompasses approximately 586 square miles in southeast Washington State. The Columbia River flows through the site (Hanford Reach.) Reactors were located along the Hanford Reach as part of the production process. Sodium dichromate was used as a corrosion inhibitor in the cooling water for the reactors. As a result chromium (Cr+6) is present in the soil and groundwater. Since the mid 90's interim groundwater pump and treat systems have been in place to try and contain or mitigate the migration of contaminated groundwater into the Columbia River. The primary concern being the protection of aquatic spawning habitat for salmon and other species. In order to improve the effectiveness of the remedial actions a number of different technologies have been evaluated and/or deployed. These include, permeable reactive barriers, in-situ bio-stimulation, in-situ chemical reduction, zero-valent iron injection and evaluation of improved above ground treatment technologies. An overview of the technologies and results to date are presented.

  12. Solvent extraction for remediation of manufactured gas plant sites

    International Nuclear Information System (INIS)

    Luthy, R.G.; Dzombak, D.A.; Peters, C.; Ali, M.A.; Roy, S.B.

    1992-12-01

    This report presents the results of an initial assessment of the feasibility of solvent extraction for removing coal tar from the subsurface or for treating contaminated soil excavated at manufactured gas plant (MGP) sites. In situ solvent extraction would involve injection, recovery, and reclamation for reinjection of an environmentally-benign, water-miscible solvent. Accelerated dissolution and removal of coaltar from the subsurface might be desirable as a remedial approach if excavation is not practical (e.g., the site underlies facilities in current use), direct pumping of coal tar is ineffective, and bioremediation is not feasible because of the presence of high concentrations of coal tar. Both laboratory experiments and engineering evaluations were performed to provide a basis for the initial feasibility assessment. Laboratory work included identification and evaluation of promising solvents, measurement of fundamental properties of coal tar-solvent-water systems, and measurement of rates of dissolution of coal tar in porous media into flowing solvent-water solutions. Engineering evaluations involved identification of common hydrogeologic features and contaminant distributions at MGP sites, and identification and evaluation of possible injection-recovery well deployment schemes. A coupled flow-chemistry model was developed for simulation of the in situ process and evaluation of the well deployment schemes. Results indicate that in situsolvent extraction may be able to recover a significant amount of coal tar from the subsurface within a reasonable time frame (on the order of one year or so) provided that subsurface conditions are conducive to process implementation. Some important implementation issues remain to be addressed

  13. Assessment of technologies for the remediation of radioactively contaminated Superfund sites

    International Nuclear Information System (INIS)

    1990-01-01

    The report is a screening evaluation of information needs for the development of generic treatability studies for the remediation of Superfund Radiation Sites on the National Priorities List (NPL). It presents a categorization of the 25 radiation sites currently proposed or listed on the NPL, and provides a rating system for evaluating technologies that may be used to remediate these sites. It also identifies gaps in site assessment and technology data and provides information about and recommendations for technology development

  14. In Situ Thermal NAPL Remediation at the Northeast Site Pinellas Environmental Restoration Project

    International Nuclear Information System (INIS)

    Juhlin, R.; Butherus, M.

    2006-01-01

    The U.S. Department of Energy (DOE) is conducting thermal remediation to remove non-aqueous phase liquids (NAPLs) from the subsurface at the Northeast Site that is part of the Pinellas Environmental Restoration Project. The Northeast Site is located on the Young - Rainey Science, Technology, and Research (STAR) Center in Largo, Florida. The STAR Center was formerly a DOE facility. The NAPL remediation was performed at Area A and is currently being performed at Area B at the Northeast Site. The remediation at Area A was completed in 2003 and covered an area of 900 m 2 (10,000 ft 2 ) and a depth of remediation that extended to 10.7 m (35 ft) below ground surface. Cleanup levels achieved were at or below maximum contaminant levels in almost all locations. The remediation project at Area B is ongoing and covers an area of 3,240 m 2 (36,000 ft 2 ), a volume of 41,300 m (54,000 yd 3), and a depth of remediation to 12 m (40 ft) below ground surface. In addition, a portion of the subsurface under an occupied building in Area B is included in the remediation. The cleanup levels achieved from this remediation will be available in the Area B Final Report that will be posted on the DOE Office of Legacy Management web site (www.lm.doe.gov/land/sites/fl/ pinellas/pinellas.htm) in January 2007. Electrical resistive heating and steam were the chosen remediation methods at both areas. Lessons learned from the Area A remediation were incorporated into the Area B remediation and could benefit managers of similar remediation projects. (authors)

  15. Federal government information handbook formerly utilized sites remedial action program

    International Nuclear Information System (INIS)

    1980-01-01

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the Federal Government. It contains: a summary of the organization and responsibilities of agencies within the executive branch of the Federal government which may be relevant to FUSRAP activities; a brief summary of relevant Federal statutes and regulations; a description of the structure of the US Congress, identification of the officers, relevant committees and committee chairmen; a description of the Federal legislative process; a summary of legislation enacted and considered in the recently-adjourned 96th Congress; a description of the Federal budgetary process; a summary of the Carter Administration's comprehensive radioactive waste management program; and excerpts from the text of relevant Federal statutes and regulations

  16. The Hanford Site Tank Waste Remediation System: An update

    International Nuclear Information System (INIS)

    Alumkal, W.T.; Babad, H.; Harmon, H.D.; Wodrich, D.D.

    1994-01-01

    The U.S. Department of Energy's Hanford Site, located in southeastern Washington State, has the most diverse and largest amount of highly radioactive waste in the United States. High-level radioactive waste has been stored in large underground tanks since 1944. Approximately 230,000 m 3 (61 Mgal) of caustic liquids, slurries, saltcakes, and sludges have 137 Cs accumulated in 177 tanks. In addition, significant amounts of 90 Sr and were removed from the tank waste, converted to salts, doubly encapsulated in metal containers., and stored in water basins. A Tank Waste Remediation System Program was established by the U.S. Department of Energy in 1991 to safely manage and immobilize these wastes in anticipation of permanent disposal of the high-level waste fraction in a geologic repository. Since 1991, progress has been made resolving waste tank safety issues, upgrading Tank Farm facilities and operations, and developing a new strategy for retrieving, treating, and immobilizing the waste for disposal

  17. Federal government information handbook: formerly utilized sites remedial action program

    International Nuclear Information System (INIS)

    1980-01-01

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the Federal Government. It contains a summary of the organization and responsibilities of agencies within the executive branch of the Federal government which may be relevant to FUSRAP activities; a brief summary of relevant Federal statutes and regulations; a description of the structure of the US Congress, identification of the officers, relevant committees and committee chairmen; a description of the Federal legislative process; a summary of legislation enacted and considered in the recently-adjourned 96th Congress; a description of the Federal budgetary process; a summary of the Carter Administration's comprehensive radioactive waste management program; and excerpts from the text of relevant federal statutes and regulations

  18. Federal government information handbook: formerly utilized sites remedial action program

    Energy Technology Data Exchange (ETDEWEB)

    1980-12-31

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the Federal Government. It contains a summary of the organization and responsibilities of agencies within the executive branch of the Federal government which may be relevant to FUSRAP activities; a brief summary of relevant Federal statutes and regulations; a description of the structure of the US Congress, identification of the officers, relevant committees and committee chairmen; a description of the Federal legislative process; a summary of legislation enacted and considered in the recently-adjourned 96th Congress; a description of the Federal budgetary process; a summary of the Carter Administration's comprehensive radioactive waste management program; and excerpts from the text of relevant federal statutes and regulations.

  19. Trade-offs between worker risk and public risk during remediation at DOE sites

    International Nuclear Information System (INIS)

    Beam, B.N.; Morris, J.; Blaylock, B.; Travis, C.

    1995-01-01

    Within the next 30 years, the US Department of Energy (DOE) Environmental Restoration Program will be responsible for remediating thousands of waste sites across the DOE complex. A major concern during remediation will be the protection of thousands of workers engaged in the remediation. In addition to well know safety hazards associated with conventional construction operations, remedial workers at DOE will encounter radiation and chemical exposures from radioactive, hazardous, and mixed waste. Although historically represented as minimal due to a paucity of data related to worker exposures during remediation, potential worker health risk is an important factor that must be taken into account in the selection of remedial strategies, and the potential risk reduction offered by a remedial strategy must be weighed against the potential worker risk incurred during its implementation. Analysis has shown a trend that the worker risk incurred outweighs,the benefits of risk reduction to the public

  20. Environmental assessment of remedial action at the inactive uraniferous lignite processing sites at Belfield and Bowman, North Dakota

    International Nuclear Information System (INIS)

    Beranich, S.; Berger, N.; Bierley, D.; Bond, T.M.; Burt, C.; Caldwell, J.A.; Dery, V.A.; Dutcher, A.; Glover, W.A.; Heydenburg, R.J.; Larson, N.B.; Lindsey, G.; Longley, J.M.; Millard, J.B.; Miller, M.; Peel, R.C.; Persson-Reeves, C.H.; Titus, F.B.; Wagner, L.

    1989-09-01

    The Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), to clean up the Belfield and Bowman, North Dakota, uraniferous lignite processing sites to reduce the potential health impacts associated with the residual radioactive materials remaining at these sites. Remedial action at these sites must be performed in accordance with the US Environmental Protection Agency's (EPA) standards promulgated for the remedial action and with the concurrence of the US Nuclear Regulatory Commission (NRC) and the state of North Dakota. The inactive Belfield uraniferous lignite processing site is one mile southeast of Belfield, North Dakota. The inactive Bowman uraniferous lignite processing site at the former town of Griffin, is seven miles northwest of Bowman, North Dakota and 65 road miles south of Belfield. Lignite ash from the processing operations has contaminated the soils over the entire 10.7-acre designated Belfield site and the entire 12.1-acre designated Bowman site. Dispersion of the ash has contaminated an additional 20.6 acres surrounding the Belfield processing site and an additional 59.2 acres surrounding the Bowman processing site. The proposed remedial action is to relocate the contaminated materials at the Belfield processing site to the Bowman processing/disposal site for codisposal with the Bowman contaminated soils. The environmental impacts assessed in this EA were evaluated for the proposed remedial action and the no action alternative and demonstrate that the proposed action would not significantly affect the quality of the human environment and would be performed in compliance with applicable environmental laws. The no action alternative would not be consistent with the intent of Public Law 95-604 and would not comply with the EPA standards. 48 refs., 10 figs., 7 tabs

  1. Sellafield - a nuclear licensed site

    International Nuclear Information System (INIS)

    Bloom, Phillipa.

    1987-01-01

    The report is based on the experience gained when visiting the Exhibition Centre at the BNFL Sellafield site and joining the hour-long coach trip round the site. The sights are recorded and a description given of the processes undertaken at Sellafield to reprocess the Magnox fuel and store the spent fuel from AGR reactors. The purpose of the main plant building, and the passage of the spent fuel through the various processes is described. Criticism is made of the safety record at Sellafield and a full and open debate on nuclear power is called for. (UK)

  2. [Urban industrial contaminated sites: a new issue in the field of environmental remediation in China].

    Science.gov (United States)

    Liao, Xiao-Yong; Chong, Zhong-Yi; Yan, Xiu-Lan; Zhao, Dan

    2011-03-01

    Contamination of urban industrial lands is a new environmental problem in China during the process of upgrade of industrial structure and adjustment of urban layout. It restricts the safe re-use of urban land resources, and threatens the health of surrounding inhabitants. In the paper, the market potential of contaminated-site remediation was known through analysis of spatial distribution of urban industrial sites in China. Remediation technologies in the Occident which were suitable for urban industrial contaminated sites were discussed and compared to evaluate their superiority and inferiority. And then, some advices of remediation technologies for urban industrial contaminated sites in China were proposed.

  3. Risk-based economic decision analysis of remediation options at a PCE-contaminated site

    DEFF Research Database (Denmark)

    Lemming, Gitte; Friis-Hansen, P.; Bjerg, Poul Løgstrup

    2010-01-01

    by the remediation activities. More attention is increasingly being given to these secondary environmental impacts when evaluating remediation options. This paper presents a methodology for an integrated economic decision analysis which combines assessments of remediation costs, health risk costs and potential...... at a downstream groundwater well. Potential environmental impacts on the local, regional and global scales due to the site remediation activities are evaluated using life cycle assessments (LCA). The potential impacts on health and environment are converted to monetary units using a simplified cost model. A case......Remediation methods for contaminated sites cover a wide range of technical solutions with different remedial efficiencies and costs. Additionally, they may vary in their secondary impacts on the environment i.e. the potential impacts generated due to emissions and resource use caused...

  4. Linde FUSRAP Site Remediation: Engineering Challenges and Solutions of Remedial Activities on an Active Industrial Facility - 13506

    International Nuclear Information System (INIS)

    Beres, Christopher M.; Fort, E. Joseph; Boyle, James D.

    2013-01-01

    The Linde FUSRAP Site (Linde) is located in Tonawanda, New York at a major research and development facility for Praxair, Inc. (Praxair). Successful remediation activities at Linde combines meeting cleanup objectives of radiological contamination while minimizing impacts to Praxair business operations. The unique use of Praxair's property coupled with an array of active and abandoned utilities poses many engineering and operational challenges; each of which has been overcome during the remedial action at Linde. The U.S. Army Corps of Engineers - Buffalo District (USACE) and CABRERA SERVICES, INC. (CABRERA) have successfully faced engineering challenges such as relocation of an aboveground structure, structural protection of an active water line, and installation of active mechanical, electrical, and communication utilities to perform remediation. As remediation nears completion, continued success of engineering challenges is critical as remaining activities exist in the vicinity of infrastructure essential to business operations; an electrical substation and duct bank providing power throughout the Praxair facility. Emphasis on engineering and operations through final remediation and into site restoration will allow for the safe and successful completion of the project. (authors)

  5. Linde FUSRAP Site Remediation: Engineering Challenges and Solutions of Remedial Activities on an Active Industrial Facility - 13506

    Energy Technology Data Exchange (ETDEWEB)

    Beres, Christopher M.; Fort, E. Joseph [Cabrera Services, Inc., 473 Silver Lane, East Hartford, CT 06118 (United States); Boyle, James D. [United States Army Corps of Engineers - Buffalo, 1776 Niagara Street, Buffalo, NY 14207 (United States)

    2013-07-01

    The Linde FUSRAP Site (Linde) is located in Tonawanda, New York at a major research and development facility for Praxair, Inc. (Praxair). Successful remediation activities at Linde combines meeting cleanup objectives of radiological contamination while minimizing impacts to Praxair business operations. The unique use of Praxair's property coupled with an array of active and abandoned utilities poses many engineering and operational challenges; each of which has been overcome during the remedial action at Linde. The U.S. Army Corps of Engineers - Buffalo District (USACE) and CABRERA SERVICES, INC. (CABRERA) have successfully faced engineering challenges such as relocation of an aboveground structure, structural protection of an active water line, and installation of active mechanical, electrical, and communication utilities to perform remediation. As remediation nears completion, continued success of engineering challenges is critical as remaining activities exist in the vicinity of infrastructure essential to business operations; an electrical substation and duct bank providing power throughout the Praxair facility. Emphasis on engineering and operations through final remediation and into site restoration will allow for the safe and successful completion of the project. (authors)

  6. Preliminary Hazard Classification for the Remediation of the 100-B/C Area Remaining Sites (Confirmatory Sampling Effort)

    International Nuclear Information System (INIS)

    Routt, T.M.

    2000-01-01

    This document provides the preliminary hazard classification for the sampling and characterization activities to be conducted at the 100-B/C confirmatory sampling effort sites in support of remedial design and eventual remediation of these sites

  7. Critical review of decision support tools for sustainability assessment of site remediation options.

    Science.gov (United States)

    Huysegoms, Lies; Cappuyns, Valérie

    2017-07-01

    In Europe alone, there are more than 2,5 million potentially contaminated sites of which 14% are expected to require remediation. Contaminated soil and groundwater can cause damage to human health as well as to valuable ecosystems. Globally more attention has been paid to this problem of soil contamination in the past decades. For example, more than 58 000 sites have been remediated in Europe between 2006 and 2011. Together with this increase in remediation projects there has been a surge in the development of new remediation technologies and decision support tools to be able to match every site and its specific characteristics to the best possible remediation alternative. In the past years the development of decision support tools (DST) has evolved in a more sustainable direction. Several DSTs added the claim not only to denote effective or technologically and economically feasible remediation alternatives but also to point out the more or most sustainable remediation alternatives. These trends in the evaluation of site remediation options left users with a confusing clew of possibly applicable tools to assist them in decision making for contaminated site remediation. This review provides a structured overview on the extent decision support tools for contaminated site remediation, that claim to assist in choosing the most sustainable remediation alternative, actually include the different elements of sustainability proposed in our assessment framework. The review contains an in-depth analysis of thirteen tools specifically developed to assess the sustainability of site remediation alternatives. This analysis is based on six criteria derived from the definition of sustainable development of the Brundtland report. The six criteria were concretized by using the three pillars of sustainability, applied to site remediation according to the SuRF-UK framework, two criteria derived from Life Cycle Assessment and Cost-Benefit Analysis, and an 'User friendly' criterion

  8. Research in Support of Remediation Activities at the Savannah River Site

    International Nuclear Information System (INIS)

    Seaman, J.C.; B.B. Looney and M.K. Harris

    2007-01-01

    The USDOE Savannah River Site (SRS), an 803-km 2 (310-mile 2 ) facility located south of Aiken, SC on the upper Atlantic Coastal Plain and bounded to the west by the Savannah River, was established in the 1950s for the production and refinement of nuclear materials. To fulfill this mission during the past 50 years SRS has operated five nuclear reactors, two large chemical separation areas, waste disposal facilities (landfills, waste ponds, waste tanks, and waste stabilization), and a large number of research and logistics support facilities. Contaminants of concern (COC) resulting from site operations include chlorinated solvents, radionuclides, metals, and metalloids, often found as complex mixtures that greatly complicate remediation efforts when compared with civilian industries. The objective of this article is to provide a description of the lithology and hydrostratigraphy of the SRS, as well as a brief history of site operations and research activities as a preface to the current special section of Vadose Zone Journal (VZJ) dedicated to SRS, focusing mainly on issues that are unique to the USDOE complex. Contributions to the special section reflect a diverse range of topics, from hydrologic tracer experiments conducted both within the vadose and saturated zones to studies specifically aimed at identifying geochemical processes controlling the migration and partitioning of specific contaminants (e.g., TCE, 137 Cs, U, and Pu) in SRS subsurface environments. Addressing the diverse environmental challenges of the SRS provides a unique opportunity to conduct both fundamental and applied research across a range of experimental scales. Hence, the SRS has been a pioneering force in several areas of environmental research and remediation, often through active interdisciplinary collaboration with researchers from other USDOE facilities, academic and federal institutions, and commercial entities

  9. Determining site-specific background level with geostatistics for remediation of heavy metals in neighborhood soils

    OpenAIRE

    Tammy M. Milillo; Gaurav Sinha; Joseph A. Gardella Jr.

    2017-01-01

    The choice of a relevant, uncontaminated site for the determination of site-specific background concentrations for pollutants is critical for planning remediation of a contaminated site. The guidelines used to arrive at concentration levels vary from state to state, complicating this process. The residential neighborhood of Hickory Woods in Buffalo, NY is an area where heavy metal concentrations and spatial distributions were measured to plan remediation. A novel geostatistics based decision ...

  10. Remedial Action Plan for stabilization of the inactive uraniferous lignite processing sites at Belfield and Bowman, North Dakota

    International Nuclear Information System (INIS)

    1990-12-01

    This remedial action plan (RAP) has been developed to serve a threefold purpose. It presents the series of activities that are proposed by the US Department of Energy (DOE) to accomplish long-term stabilization and control of radioactive materials at the inactive uraniferous lignite processing sites at Belfield and near Bowman (at the former Griffin town site), North Dakota. It provides a characterization of the present conditions of the sites. It also serves to document the concurrence of the state of North Dakota and the US Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by the DOE and the state of North Dakota and concurrence by the NRC, becomes Appendix B of the Cooperative Agreement

  11. Environmental assessment of remedial action at the Naturita uranium processing site near Naturita, Colorado. Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    The proposed remedial action for the Naturita processing site is relocation of the contaminated materials and debris to the Dry Flats disposal site, 6 road miles (mi) [10 kilometers (km)] to the southeast. At the disposal site, the contaminated materials would be stabilized and covered with layers of earth and rock. The proposed disposal site is on land administered by the Bureau of Land Management (BLM) and used primarily for livestock grazing. The final disposal site would cover approximately 57 ac (23 ha), which would be permanently transferred from the BLM to the DOE and restricted from future uses. The remedial action activities would be conducted by the DOE`s Uranium Mill Tailings Remedial Action (UMTRA) Project. The proposed remedial action would result in the loss of approximately 162 ac (66 ha) of soils at the processing and disposal sites; however, 133 ac (55 ha) of these soils at and adjacent to the processing site are contaminated and cannot be used for other purposes. If supplemental standards are approved by the NRC and state of Colorado, approximately 112 ac (45 ha) of contaminated soils adjacent to the processing site would not be cleaned up. This area is steeply sloped. The cleanup of this contamination would have adverse environmental consequences and would be potentially hazardous to remedial action workers. Another 220 ac (89 ha) of soils would be temporarily disturbed during the remedial action. The final disposal site would result in approximately 57 ac (23 ha) being removed from livestock grazing and wildlife use.

  12. Environmental assessment of remedial action at the Naturita uranium processing site near Naturita, Colorado

    International Nuclear Information System (INIS)

    1994-02-01

    The proposed remedial action for the Naturita processing site is relocation of the contaminated materials and debris to the Dry Flats disposal site, 6 road miles (mi) [10 kilometers (km)] to the southeast. At the disposal site, the contaminated materials would be stabilized and covered with layers of earth and rock. The proposed disposal site is on land administered by the Bureau of Land Management (BLM) and used primarily for livestock grazing. The final disposal site would cover approximately 57 ac (23 ha), which would be permanently transferred from the BLM to the DOE and restricted from future uses. The remedial action activities would be conducted by the DOE's Uranium Mill Tailings Remedial Action (UMTRA) Project. The proposed remedial action would result in the loss of approximately 162 ac (66 ha) of soils at the processing and disposal sites; however, 133 ac (55 ha) of these soils at and adjacent to the processing site are contaminated and cannot be used for other purposes. If supplemental standards are approved by the NRC and state of Colorado, approximately 112 ac (45 ha) of contaminated soils adjacent to the processing site would not be cleaned up. This area is steeply sloped. The cleanup of this contamination would have adverse environmental consequences and would be potentially hazardous to remedial action workers. Another 220 ac (89 ha) of soils would be temporarily disturbed during the remedial action. The final disposal site would result in approximately 57 ac (23 ha) being removed from livestock grazing and wildlife use

  13. Scheduling the Remediation of Port Hope: Logistical and Regulatory Challenges of a Multiple Site Urban Remediation Project - 13119

    International Nuclear Information System (INIS)

    Ferguson Jones, Andrea; Lee, Angela; Palmeter, Tim

    2013-01-01

    The Port Hope Project is part of the larger CAN$1.28 billion Port Hope Area Initiative (PHAI), a community-based program for the development and implementation of a safe, local, long-term management solution for historic Low-Level Radioactive Waste (LLRW) in the Municipalities of Port Hope and Clarington, Ontario, Canada. Atomic Energy of Canada (AECL) is the Project Proponent, Public Works and Government Services (PWGSC) is managing the procurement of services and the MMM Group Limited - Conestoga Rovers and Associates Joint Venture (MMM-CRA Joint Venture) is providing detailed design and construction oversight and administration services for the Project. The Port Hope Project includes the construction of a long-term waste management facility (LTWMF) in the Municipality of Port Hope and the remediation of 18 (eighteen) large-scale LLRW, numerous small-scale sites still being identified and industrial sites within the Municipality. The total volume to be remediated is over one million cubic metres and will come from sites that include temporary storage sites, ravines, beaches, parks, private commercial and residential properties and vacant industrial sites all within the urban area of Port Hope. Challenges that will need to be overcome during this 10 year project include: - Requirements stipulated by the Environmental Assessment (EA) that affect Project logistics and schedule. - Coordination of site remediation with the construction schedule at the LTWMF. - Physical constraints on transport routes and at sites affecting production rates. - Despite being an urban undertaking, seasonal constrains for birds and fish (i.e., nesting and spawning seasons). - Municipal considerations. - Site-specific constraints. - Site interdependencies exist requiring consideration in the schedule. Several sites require the use of an adjacent site for staging. (authors)

  14. Scheduling the Remediation of Port Hope: Logistical and Regulatory Challenges of a Multiple Site Urban Remediation Project - 13119

    Energy Technology Data Exchange (ETDEWEB)

    Ferguson Jones, Andrea; Lee, Angela [MMM Group Limited, 100 Commerce Valley Drive West, Thornhill, Ontario, L3T 0A1 (Canada); Palmeter, Tim [Public Works and Government Services Canada, 4900 Yonge Street, Toronto, Ontario, M2N 6A6 (Canada)

    2013-07-01

    The Port Hope Project is part of the larger CAN$1.28 billion Port Hope Area Initiative (PHAI), a community-based program for the development and implementation of a safe, local, long-term management solution for historic Low-Level Radioactive Waste (LLRW) in the Municipalities of Port Hope and Clarington, Ontario, Canada. Atomic Energy of Canada (AECL) is the Project Proponent, Public Works and Government Services (PWGSC) is managing the procurement of services and the MMM Group Limited - Conestoga Rovers and Associates Joint Venture (MMM-CRA Joint Venture) is providing detailed design and construction oversight and administration services for the Project. The Port Hope Project includes the construction of a long-term waste management facility (LTWMF) in the Municipality of Port Hope and the remediation of 18 (eighteen) large-scale LLRW, numerous small-scale sites still being identified and industrial sites within the Municipality. The total volume to be remediated is over one million cubic metres and will come from sites that include temporary storage sites, ravines, beaches, parks, private commercial and residential properties and vacant industrial sites all within the urban area of Port Hope. Challenges that will need to be overcome during this 10 year project include: - Requirements stipulated by the Environmental Assessment (EA) that affect Project logistics and schedule. - Coordination of site remediation with the construction schedule at the LTWMF. - Physical constraints on transport routes and at sites affecting production rates. - Despite being an urban undertaking, seasonal constrains for birds and fish (i.e., nesting and spawning seasons). - Municipal considerations. - Site-specific constraints. - Site interdependencies exist requiring consideration in the schedule. Several sites require the use of an adjacent site for staging. (authors)

  15. Comparison of the environmental impacts of two remediation technologies used at hydrocarbon contaminated sites

    International Nuclear Information System (INIS)

    Viikala, R.; Kuusola, J.

    2000-01-01

    Investigation and remediation of contaminated sites has rapidly increased in Finland during the last decade. Public organisations as well as private companies are investigating and remediating their properties, e.g. redevelopment or business transactions. Also numerous active and closed gasoline stations have been investigated and remediated during the last few years. Usually the contaminated sites are remediated to limit values regardless of the risk caused by contamination. The limit values currently used in Finland for hydrocarbon remediation at residential or ground water areas are 300 mg/kg of total hydrocarbons and 100 mg/kg of volatile hydrocarbons (boiling point < appr. 200 deg C). Additionally, compounds such as aromatic hydrocarbons have specific limit values. Remediation of hydrocarbon contaminated sites is most often carried out by excavating the contaminated soil and taking it to a landfill by lorries. As distances from the sites to landfills are generally rather long, from tens of kilometres to few hundred kilometres, it is evident that this type of remediation has environmental impacts. Another popular technology used at sites contaminated by volatile hydrocarbons is soil vapour extraction (SVE). SVE is a technique of inducing air flow through unsaturated soils by vapour extraction wells or pipes to remove organic contaminants with an off-gas treatment system. The purpose of this study was to evaluate some of the environmental impacts caused by remediation of hydrocarbon contaminated soil. Energy consumption and air emissions related remedial activities of the two methods were examined in this study. Remediation of the sites used in this study were carried out by Golder Associates Oy in different parts of Finland in different seasons. Evaluation was made by using life cycle assessment based approach

  16. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Rifle, Colorado

    International Nuclear Information System (INIS)

    1990-02-01

    This document has been structured to provide a comprehensive understanding of the remedial action proposed for the Rifle sites. That remedial action consists of removing approximately 4,185,000 cubic yards (cy) of tailings and contaminated materials from their current locations, transporting, and stabilizing the tailings material at the Estes Gulch disposal site, approximately six miles north of Rifle. The tailings and contaminated materials are comprised of approximately 597,000 cy from Old Rifle, 3,232,000 cy from New Rifle, and 322,000 cy from vicinity properties and about 34,000 cy from demolition. The remedial action plan includes specific design requirements for the detailed design and construction of the remedial action. An extensive amount of data and supporting information have been generated for this remedial action and cannot all be incorporated into this document. Pertinent information and data are included with reference given to the supporting documents

  17. Remedial actions at the former Union Carbide Corporation uranium mill sites, Rifle, Garfield County, Colorado

    International Nuclear Information System (INIS)

    1990-03-01

    This appendix provides the information needed to understand the conceptual designs for the remedial action alternatives addressed in this environmental impact statement (EIS). It is intended to provide sufficient details for the reader to evaluate the feasibility and assess the impacts of each remedial action alternative. It is not intended to provide the detailed engineering necessary to implement the alternatives. Details of the preferred remedial action will be presented in the remedial action plan (RAP). The remedial action alternatives addressed in this EIS include no action, stabilization at the New Rifle site, disposal at the Estes Gulch site, and disposal at the Lucas Mesa site. All alternatives include interim actions to remediate existing health and safety hazards to the Rifle community that presently exist at the Old and New Rifle processing sites. It should be noted that the borrow sites included in this EIS were selected as the sources of the necessary borrow materials for impacts analyses purposes only. The borrow sites to be used for the remedial action will be selected during the final design. 21 figs., 18 tabs

  18. Remedial action and site design for stabilization of the inactive uranium mill tailings sites at Slick Rock, Colorado

    International Nuclear Information System (INIS)

    1993-07-01

    This report presents geologic considerations that are pertinent to the Remedial Action Plan for Slick Rock mill tailings. Topics covered include regional geology, site geology, geologic stability, and geologic suitability

  19. A complete remediation process for a uranium-contaminated site and application to other sites

    International Nuclear Information System (INIS)

    Mason, C.F.V.; Lu, N.; Kitten, H.D.; Williams, M.; Turney, W.R.J.R.

    1998-01-01

    During the summer of 1996 the authors were able to test, at the pilot scale, the concept of leaching uranium (U) from contaminated soils. The results of this pilot scale operation showed that the system they previously had developed at the laboratory scale is applicable at the pilot scale. The paper discusses these results, together with laboratory scale results using soil from the Fernald Environmental Management Project (FEMP), Ohio. These FEMP results show how, with suitable adaptations, the process is widely applicable to other sites. The purpose of this paper is to describe results that demonstrate remediation of uranium-contaminated soils may be accomplished through a leach scheme using sodium bicarbonate

  20. A complete remediation process for a uranium-contaminated site and application to other sites

    Energy Technology Data Exchange (ETDEWEB)

    Mason, C.F.V.; Lu, N.; Kitten, H.D.; Williams, M.; Turney, W.R.J.R.

    1998-12-31

    During the summer of 1996 the authors were able to test, at the pilot scale, the concept of leaching uranium (U) from contaminated soils. The results of this pilot scale operation showed that the system they previously had developed at the laboratory scale is applicable at the pilot scale. The paper discusses these results, together with laboratory scale results using soil from the Fernald Environmental Management Project (FEMP), Ohio. These FEMP results show how, with suitable adaptations, the process is widely applicable to other sites. The purpose of this paper is to describe results that demonstrate remediation of uranium-contaminated soils may be accomplished through a leach scheme using sodium bicarbonate.

  1. Remedial action plan for the inactive uranium processing site at Naturita, Colorado. Remedial action selection report: Attachment 2, geology report; Attachment 3, ground water hydrology report; Attachment 4, supplemental information

    International Nuclear Information System (INIS)

    1998-03-01

    The uranium processing site near Naturita, Colorado, is one of 24 inactive uranium mill sites designated to be cleaned up by the U.S. Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), 42 USC section 7901 et seq. Part of the UMTRCA requires that the U.S. Nuclear Regulatory Commission (NRC) concur with the DOE's remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the U.S. Environmental Protection Agency (EPA). This RAP serves two purposes. First, it describes the activities that are proposed by the DOE to accomplish remediation and long-term stabilization and control of the radioactive materials at the inactive uranium processing site near Naturita, Colorado. Second, this RAP, upon concurrence and execution by the DOE, the state of Colorado, and the NRC, becomes Appendix B of the cooperative agreement between the DOE and the state of Colorado

  2. Remediation of the Faultless Underground Nuclear Test: Moving Forward in the Face of Model Uncertainty

    International Nuclear Information System (INIS)

    Chapman, J. B.; Pohlmann, K.; Pohll, G.; Hassan, A.; Sanders, P.; Sanchez, M.; Jaunarajs, S.

    2002-01-01

    The Faultless underground nuclear test, conducted in central Nevada, is the site of an ongoing environmental remediation effort that has successfully progressed through numerous technical challenges due to close cooperation between the U.S. Department of Energy, (DOE) National Nuclear Security Administration and the State of Nevada Division of Environmental Protection (NDEP). The challenges faced at this site are similar to those of many other sites of groundwater contamination: substantial uncertainties due to the relative lack of data from a highly heterogeneous subsurface environment. Knowing when, where, and how to devote the often enormous resources needed to collect new data is a common problem, and one that can cause remediators and regulators to disagree and stall progress toward closing sites. For Faultless, a variety of numerical modeling techniques and statistical tools are used to provide the information needed for DOE and NDEP to confidently move forward along the remediation path to site closure. A general framework for remediation was established in an agreement and consent order between DOE and the State of Nevada that recognized that no cost-effective technology currently exists to remove the source of contaminants in nuclear cavities. Rather, the emphasis of the corrective action is on identifying the impacted groundwater resource and ensuring protection of human health and the environment from the contamination through monitoring. As a result, groundwater flow and transport modeling is the linchpin in the remediation effort. An early issue was whether or not new site data should be collected via drilling and testing prior to modeling. After several iterations of the Corrective Action Investigation Plan, all parties agreed that sufficient data existed to support a flow and transport model for the site. Though several aspects of uncertainty were included in the subsequent modeling work, concerns remained regarding uncertainty in individual

  3. 1993 International conference on nuclear waste management and environmental remediation, Prague, Czech Republic, September 5--11, 1993

    International Nuclear Information System (INIS)

    Slate, S.C.; Allen, R.E.

    1993-12-01

    The purpose of the trip was to attend the 1993 International Conference on Nuclear Waste Management and Environmental Remediation. The principal objective of this conference was to facilitate a truly international exchange of information on the management of nuclear wastes as well as contaminated facilities and sites emanating from nuclear operations. The conference was sponsored by the American Society of Mechanical Engineers, the Czech and Slovak Mechanical Engineering Societies, and the Czech and Slovak Nuclear Societies in cooperation with the Commission of the European Communities, the International Atomic Energy Agency, and the OECD Nuclear Agency. The conference was cosponsored by the American Nuclear Society, the Atomic Energy Society of Japan, the Canadian Nuclear Society, the (former USSR) Nuclear Society, and the Japan Society of Mechanical Engineers. This was the fourth in a series of biennial conferences, which started in Hong Kong, in 1987. This report summarizes shared aspects of the trip; however, each traveler's observations and recommendations are reported separately

  4. Status policy and criteria for the remediation of sites with radioactive residues in China

    International Nuclear Information System (INIS)

    Yamin, Z.

    1999-01-01

    This paper introduces the status policy and criteria for remediation of sites with radioactive residues in China. We deal with the sites in difference patterns according to their circumstances. For the sites related with the decommissioning of the nuclear fuel cycle facilities, the programs for environmental restoration must be reviewed and approved by the State Environmental Protection Administration (SEPA). And the radioactive waste resulting from these facilities should be collected and eventually disposed of at the regional disposal repositories built by the country. For the sites related with use of radionuclides in medicine, research and industry, as well as the small scale extraction and processing of materials containing natural radionuclides, the provincial environmental authority is responsible for approving the restoration projects. These radioactive wastes should finally be sent to the special radioactive waste repositories built by the provincial environmental authorities. So far 21 waste repositories have been built in some provinces. More then 10 sites with radioactive residues have been restored. The standards for general public dose limit and soil residual radionuclides content have been established. (author)

  5. Remedial investigation for the chemical plant area of the Weldon Spring Site

    International Nuclear Information System (INIS)

    1992-11-01

    The US Department of Energy (DOE) is responsible for management of the Weldon Spring Site Remedial Action Project (WSSRAP) under its Environmental Restoration and Waste Management Program. Major goals include eliminating potential public and environmental hazards due to site contamination and releasing the property for alternate uses to the maximum extent practicable. The purpose of the remedial investigation described in this report was to determine the extent of contamination associated with the portion of the Weldon Spring site known as the chemical plant and raffinate pit area. The DOE has assumed responsibility for investigating and remediating all on-site soil contamination and off-site soil which is radiologically contaminated as a result of uranium and thorium processing operations. The DOE has also assumed the responsibility for radiologically contaminated groundwater on and off site. The Weldon Spring site remedial investigation also involved the evaluation of the sources, nature and extent, and environmental fate and transport of contaminants to provide a basis for defining the risks that the contaminants may pose to human health and the environment. Data are included in this report to support the screening of remedial technologies and to permit the development and detailed analysis of alternatives for remedial action at the site during the feasibility study process

  6. Radioecological condition assessment and remediation criteria for sites of spent fuel and radioactive waste storage in the russian northwest

    International Nuclear Information System (INIS)

    Shandala, Nataliya; Titov, Alex; Novikova, Natalia; Kiselev, Mikhail; Romanov, Vladimir; Sneve, Malgorzata; Smith, Graham

    2008-01-01

    The Norwegian Radiation Protection Authority and the Federal Medical-Biological Agency of the Russian Federation have a regulatory cooperation programme which is concerned with management of the nuclear legacy in northwest Russia, and, in particular, the remediation of facilities for spent fuel and radioactive waste management at the former Shore Technical Bases at Andreeva Bay and Gremikha Village. New regulatory guidance documents have been developed, necessary because of the special abnormal situation at these sites, now designated as Sites of Temporary Storage, but also because of the transition from military to civilian regulatory supervision and the evolving regulatory system in the Russian Federation. This paper presents the progress made and on-going projects in 2008 which involve development of the radio-ecological basis for identifying radiation supervision area boundaries and a system of recommended dose constraints and derived control levels for protection of workers and the public. Unconditional guarantee of long-term radioecological protection serves as the basis for criteria development. Non-exceedance of these dose constraints and control levels implies compliance with radiological protection objectives related to the residual contamination. Dose reduction below proposed dose constraint values must also be carried out according to the optimization principle. A number of remediation strategies are considered, corresponding to different future land use assumptions, including interim continued use in a nuclear context. The developed criteria relate to conditions of facilities and surrounding areas at the sites of temporary storage after completion of their remediation, and during the interim stages of remediation, depending upon the remediation strategy adopted. (author)

  7. Environmental assessment of remedial action at the Naturita Uranium processing site near Naturita, Colorado. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-01

    The proposed remedial action for the Naturita processing site is relocation of the contaminated materials and debris to the Dry Flats disposal sits, 6 road miles (mi) [10 kilometers (km)) to the southeast. At the disposal site, the contaminated materials would be stabilized and covered with layers of earth and rock. The proposed disposal site is on land administered by the Bureau of Land Management (BLM) and used primarily for livestock grazing. The final disposal sits would cover approximately 57 ac (23 ha), which would be permanently transferred from the BLM to the DOE and restricted from future uses. The remedial action activities would be conducted by the DOE`s Uranium Mill Tailings Remedial Action (UMTRA) Project. The proposed remedial action would result in the loss of approximately 162 ac (66 ha) of soils at the processing and disposal sites; however, 133 ac (55 ha) of these soils at and adjacent to the processing site are contaminated and cannot be used for other purposes. If supplemental standards are approved by the NRC and state of Colorado, approximately 112 ac (45 ha) of contaminated soils adjacent to the processing site would not be cleaned up. This area is steeply sloped. The cleanup of this contamination would have adverse environmental consequences and would be potentially hazardous to remedial action workers. Another 220 ac (89 ha) of soils would be temporarily disturbed during the remedial action. The final disposal site would result in approximately 57 ac (23 ha) being removed from livestock grazing and wildlife use.

  8. Environmental assessment of remedial action at the Naturita Uranium processing site near Naturita, Colorado

    International Nuclear Information System (INIS)

    1994-01-01

    The proposed remedial action for the Naturita processing site is relocation of the contaminated materials and debris to the Dry Flats disposal sits, 6 road miles (mi) [10 kilometers (km)) to the southeast. At the disposal site, the contaminated materials would be stabilized and covered with layers of earth and rock. The proposed disposal site is on land administered by the Bureau of Land Management (BLM) and used primarily for livestock grazing. The final disposal sits would cover approximately 57 ac (23 ha), which would be permanently transferred from the BLM to the DOE and restricted from future uses. The remedial action activities would be conducted by the DOE's Uranium Mill Tailings Remedial Action (UMTRA) Project. The proposed remedial action would result in the loss of approximately 162 ac (66 ha) of soils at the processing and disposal sites; however, 133 ac (55 ha) of these soils at and adjacent to the processing site are contaminated and cannot be used for other purposes. If supplemental standards are approved by the NRC and state of Colorado, approximately 112 ac (45 ha) of contaminated soils adjacent to the processing site would not be cleaned up. This area is steeply sloped. The cleanup of this contamination would have adverse environmental consequences and would be potentially hazardous to remedial action workers. Another 220 ac (89 ha) of soils would be temporarily disturbed during the remedial action. The final disposal site would result in approximately 57 ac (23 ha) being removed from livestock grazing and wildlife use

  9. Remedial investigation/feasibility study for the David Witherspoon, Inc., 901 Site, Knoxville, Tennessee: Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-10-01

    This remedial investigation (RI)/feasibility study (FS) supports the selection of remedial actions for the David Witherspoon, Inc. 901 Maryville Pike Site in Knoxville, Tennessee. Operations at the site, used as a recycling center, have resulted in past, present, and potential future releases of hazardous substances in to the environment. This Site is a Tennessee Superfund site. A phased approach was planned to (1) gather existing data from previous investigations managed by the Tenn. Dept. of Environment and Conservation; (2) perform a preliminary RI, including risk assessments, and an FS with existing data to identify areas where remedial action may be necessary; (3) gather additional field data to adequately define the nature and extent of risk-based contaminants that present identifiable threats to human and/or ecological receptors; and (4) develop remedial action alternatives to reduce risks to acceptable levels.

  10. Remedial investigation/feasibility study for the David Witherspoon, Inc., 901 Site, Knoxville, Tennessee: Volume 1

    International Nuclear Information System (INIS)

    1996-10-01

    This remedial investigation (RI)/feasibility study (FS) supports the selection of remedial actions for the David Witherspoon, Inc. 901 Maryville Pike Site in Knoxville, Tennessee. Operations at the site, used as a recycling center, have resulted in past, present, and potential future releases of hazardous substances in to the environment. This Site is a Tennessee Superfund site. A phased approach was planned to (1) gather existing data from previous investigations managed by the Tenn. Dept. of Environment and Conservation; (2) perform a preliminary RI, including risk assessments, and an FS with existing data to identify areas where remedial action may be necessary; (3) gather additional field data to adequately define the nature and extent of risk-based contaminants that present identifiable threats to human and/or ecological receptors; and (4) develop remedial action alternatives to reduce risks to acceptable levels

  11. Environmental assessment of remedial action at the Shiprock uranium mill tailings site, Shiprock, New Mexico: Volume 1, Text

    Energy Technology Data Exchange (ETDEWEB)

    None

    1984-05-01

    This document assesses and compares the environmental impacts of various alternatives for remedial action at the shiprock uranium mill tailings site located on the Navajo Indian Reservation, one mile south of Shiprock, New Mexico. The site contains 72 acres of tailings and four of the original mill buildings. The Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), Public Law 95-604, authorizes the US Department of Energy to clean up the site to reduce the potential health impacts associated with the residual radioactive materials remaining at the site and at associated properties off the site. The US Environmental Protection Agency promulgated standards for the remedial actions (40 CFR 192). Remedial actions must be performed in accordance with these standards and with the concurrence of the Nuclear Regulatory Commission. The proposed action is to stabilize the tailings at their present location by consolidating the tailings and associated contaminated soils into a recontoured pile. A seven-foot-thick radon barrier would be constructed over the pile and various erosion control measures would be taken to assure the long-term integrity of the pile. Three other alternatives which involve moving the tailings to new locations are assessed in this document. These alternatives which involve moving the tailings to new locations are assessed in this document. These alternatives generally involve greater short-term impacts and are more costly but would result in the tailings being stabilized in a more remote location. The no action alternative is also assessed. 99 refs., 40 figs., 58 tabs.

  12. Environmental Assessment of remedial action at the Ambrosia Lake uranium mill tailings site, Ambrosia Lake, New Mexico

    Energy Technology Data Exchange (ETDEWEB)

    1987-06-01

    This document assesses and compares the environmental impacts of various alternatives for remedial action at the Ambrosia Lake uranium mill tailings site located near Ambrosia Lake, New Mexico. The designated site covers 196 acres and contains 111 acres of tailings and some of the original mill structures. The Uranium Mill Tailings Radiation Control Act (UMTRCA), Public Law 95-604, authorizes the US Department of Energy to clean up the site to reduce the potential health impacts associated with the residual radioactive materials remaining at the site and at associated properties off the site. The US Environmental Protection Agency promulgated standards for th remedial action (40 CFR Part 192). Remedial action must be performed in accordance with these standards and with the concurrence of the Nuclear Regulatory Commission. The proposed action is to stabilize the tailings at their present location by consolidating the tailings and associated contaminated materials into a recontoured pile. A radon barrier would be constructed over the pile and various erosion protection measures would be taken to assure the long-term stability of the pile. Another alternative which would involve moving the tailings to a new location is also assessed in this document. This alternative would generally involve greater short-term impacts and costs but would result in stabilization of the tailings at an undeveloped location. The no action alternative is also assessed in this document.

  13. Environmental assessment of remedial action at the Shiprock uranium mill tailings site, Shiprock, New Mexico: Volume 1, Text

    International Nuclear Information System (INIS)

    1984-05-01

    This document assesses and compares the environmental impacts of various alternatives for remedial action at the shiprock uranium mill tailings site located on the Navajo Indian Reservation, one mile south of Shiprock, New Mexico. The site contains 72 acres of tailings and four of the original mill buildings. The Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), Public Law 95-604, authorizes the US Department of Energy to clean up the site to reduce the potential health impacts associated with the residual radioactive materials remaining at the site and at associated properties off the site. The US Environmental Protection Agency promulgated standards for the remedial actions (40 CFR 192). Remedial actions must be performed in accordance with these standards and with the concurrence of the Nuclear Regulatory Commission. The proposed action is to stabilize the tailings at their present location by consolidating the tailings and associated contaminated soils into a recontoured pile. A seven-foot-thick radon barrier would be constructed over the pile and various erosion control measures would be taken to assure the long-term integrity of the pile. Three other alternatives which involve moving the tailings to new locations are assessed in this document. These alternatives which involve moving the tailings to new locations are assessed in this document. These alternatives generally involve greater short-term impacts and are more costly but would result in the tailings being stabilized in a more remote location. The no action alternative is also assessed. 99 refs., 40 figs., 58 tabs

  14. Environmental Assessment of remedial action at the Ambrosia Lake uranium mill tailings site, Ambrosia Lake, New Mexico

    International Nuclear Information System (INIS)

    1987-06-01

    This document assesses and compares the environmental impacts of various alternatives for remedial action at the Ambrosia Lake uranium mill tailings site located near Ambrosia Lake, New Mexico. The designated site covers 196 acres and contains 111 acres of tailings and some of the original mill structures. The Uranium Mill Tailings Radiation Control Act (UMTRCA), Public Law 95-604, authorizes the US Department of Energy to clean up the site to reduce the potential health impacts associated with the residual radioactive materials remaining at the site and at associated properties off the site. The US Environmental Protection Agency promulgated standards for th remedial action (40 CFR Part 192). Remedial action must be performed in accordance with these standards and with the concurrence of the Nuclear Regulatory Commission. The proposed action is to stabilize the tailings at their present location by consolidating the tailings and associated contaminated materials into a recontoured pile. A radon barrier would be constructed over the pile and various erosion protection measures would be taken to assure the long-term stability of the pile. Another alternative which would involve moving the tailings to a new location is also assessed in this document. This alternative would generally involve greater short-term impacts and costs but would result in stabilization of the tailings at an undeveloped location. The no action alternative is also assessed in this document

  15. Remediation of the Lermontov mining site in Russia

    International Nuclear Information System (INIS)

    Krotkov, V.V.

    2001-01-01

    For 40 years, uranium mines were operated in the direct vicinity of the spas of Mineralnyje Wody, Pjatigorsk, Kislowodsk, Jessentuki and Zheleznowodsk by the Almaz company. Now that the mines have been abandoned, the spa region is surrounded by contaminated land. Remedial measures are projected in accordance with radiation protection standards [de

  16. ALTERNATIVE REMEDIATION TECHNOLOGY STUDY FOR GROUNDWATER TREATMENT AT 200-PO-1 OPERABLE UNIT AT HANFORD SITE

    Energy Technology Data Exchange (ETDEWEB)

    DADO MA

    2008-07-31

    This study focuses on the remediation methods and technologies applicable for use at 200-PO-I Groundwater Operable Unit (OU) at the Hanford Site. The 200-PO-I Groundwater au requires groundwater remediation because of the existence of contaminants of potential concern (COPC). A screening was conducted on alternative technologies and methods of remediation to determine which show the most potential for remediation of groundwater contaminants. The possible technologies were screened to determine which would be suggested for further study and which were not applicable for groundwater remediation. COPCs determined by the Hanford Site groundwater monitoring were grouped into categories based on properties linking them by remediation methods applicable to each COPC group. The screening considered the following criteria. (1) Determine if the suggested method or technology can be used for the specific contaminants found in groundwater and if the technology can be applied at the 200-PO-I Groundwater au, based on physical characteristics such as geology and depth to groundwater. (2) Evaluate screened technologies based on testing and development stages, effectiveness, implementability, cost, and time. This report documents the results of an intern research project conducted by Mathew Dado for Central Plateau Remediation in the Soil and Groundwater Remediation Project. The study was conducted under the technical supervision of Gloria Cummins and management supervision of Theresa Bergman and Becky Austin.

  17. Site remediation and the future of radiation protection

    International Nuclear Information System (INIS)

    Olsen, R.L.

    1999-01-01

    An ongoing project on The Future of Radiation Protection is exploring the most important radiation-related challenges that may emerge between now and 2025. Project participants have already identified the restoration of sites contaminated by radioactive residues as one of the central challenges of the generation ahead. Scenarios developed in the project explore a wide range of plausible radiation protection futures, from highly desirable futures to futures dominated by problems and crises. The most negative scenario involves many developments that produce radioactive residues, from accidents that release radionuclides and scandals over the improper handling and disposal of radioactive wastes to accelerating proliferation of nuclear weapons and incidents of radiological terrorism. A majority of expert participants in focus groups conducted as part of the project view this negative scenario as the most probable future. Other scenarios explore a 'greater use' future (e.g., a second generation of nuclear power) and a future where advancing technology leads away from the use of radioactive materials. These two scenarios elicit strong enthusiasm from different sets of participants, but neither of them is viewed as likely. A final 'Whole System Protection' scenario is viewed favorably by the widest range of participants and is viewed as reasonably likely. This scenario is being developed further in the current stage of the project. It is being developed to highlight common ground between participants in terms of agreement on 'principles for guiding action.' Principles such as total accounting, pollution prevention, risk harmonization, public right to know, stewardship, and sustainability may form a framework for guiding action that can transcend traditional debates and revitalize the field of radiation protection. (author)

  18. Innovative technology for expedited site remediation of extensive surface and subsurface contamination

    International Nuclear Information System (INIS)

    Audibert, J.M.E.; Lew, L.R.

    1994-01-01

    Large scale surface and subsurface contamination resulted from numerous releases of feed stock, process streams, waste streams, and final product at a major chemical plant. Soil and groundwater was contaminated by numerous compounds including lead, tetraethyl lead, ethylene dibromide, ethylene dichloride, and toluene. The state administrative order dictated that the site be investigated fully, that remedial alternative be evaluated, and that the site be remediated within a year period. Because of the acute toxicity and extreme volatility of tetraethyl lead and other organic compounds present at the site and the short time frame ordered by the regulators, innovative approaches were needed to carry out the remediation while protecting plant workers, remediation workers, and the public

  19. Final Work Plan for a Remedial Action Plan in Support of the Risk-Based Approach to Remediation at KC-135 Crash Site

    National Research Council Canada - National Science Library

    1994-01-01

    ... receptor exposure to fuel-hydrocarbon- contaminated environmental media at the KC-135 Crash Site. The second goal is to implement any necessary and appropriate remedial technologies at the KC-135 Crash Site...

  20. Environmental audit of the Maywood Site: Formerly Utilized Sites Remedial Action Program, Maywood Interim Storage Site vicinity properties

    Energy Technology Data Exchange (ETDEWEB)

    1990-12-01

    This report presents the results of the Environmental Audit of the Maywood Site managed by the Formerly Utilized Sites Remedial Action Program (FUSRAP). The Audit was carried out from November 7 through 16, 1990. The Audit Team found overall technical competence and knowledge of management and staff to be excellent. This applies to DOE as well as to Bechtel National, Incorporated (BNI). In particular, there was excellent knowledge of federal, state, and local environmental regulations, as well as analysis for applicability of these regulations to FUSRAP. Project management of the Maywood Site is also excellent. BNI and DOE project staff have made frequent contact with members of the community, and all removal actions and remedial investigation activities have been planned, scheduled, and accomplished with competence and attention to total quality principles. To date, all actions taken for the Maywood Site cleanup have been completed ahead of schedule and on or under budget. Weakness noted include self-assessment efforts by DOE, failure to fully implement DOE Order requirements throughout the program, and some discrepancies in formally documenting and reviewing procedures. 7 figs., 10 tabs.

  1. Vicinity Property Assessments at Formerly Utilized Sites Remedial Action Program Project Sites in the New York District - 13420

    Energy Technology Data Exchange (ETDEWEB)

    Ewy, Ann; Hays, David [U.S. Army Corps of Engineers (United States)

    2013-07-01

    The Formerly Utilized Sites Remedial Action Program (FUSRAP) has addressed sites across the nation for almost 4 decades. Multiple stake holder pressures, multiple regulations, and process changes occur over such long time periods. These result in many challenges to the FUSRAP project teams. Initial FUSRAP work was not performed under Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Records of Decision (ROD). The ROD identifies the remedy decision and ultimately the criteria to be used to release a site. Early FUSRAP projects used DOE Orders or the Uranium Mill Tailings Radiation Control Act (UMTRCA) standards. Under current RODs, regulations may differ, resulting in different cleanup criteria than that used in prior Vicinity Property (VP) remediation. The USACE, in preparation for closeout of Sites, conducts reviews to evaluate whether prior actions were sufficient to meet the cleanup criteria specified in the current ROD. On the basis of these reviews, USACE has conducted additional sampling, determined that prior actions were sufficient, or conducted additional remediation consistent with the selected remedy in the ROD. As the public pressures, regulations, and processes that the FUSRAP encounters continue to change, the program itself continues to evolve. Assessment of VPs at FUSRAP sites is a necessary step in the life cycle of our site management. (authors)

  2. Vicinity Property Assessments at Formerly Utilized Sites Remedial Action Program Project Sites in the New York District - 13420

    International Nuclear Information System (INIS)

    Ewy, Ann; Hays, David

    2013-01-01

    The Formerly Utilized Sites Remedial Action Program (FUSRAP) has addressed sites across the nation for almost 4 decades. Multiple stake holder pressures, multiple regulations, and process changes occur over such long time periods. These result in many challenges to the FUSRAP project teams. Initial FUSRAP work was not performed under Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Records of Decision (ROD). The ROD identifies the remedy decision and ultimately the criteria to be used to release a site. Early FUSRAP projects used DOE Orders or the Uranium Mill Tailings Radiation Control Act (UMTRCA) standards. Under current RODs, regulations may differ, resulting in different cleanup criteria than that used in prior Vicinity Property (VP) remediation. The USACE, in preparation for closeout of Sites, conducts reviews to evaluate whether prior actions were sufficient to meet the cleanup criteria specified in the current ROD. On the basis of these reviews, USACE has conducted additional sampling, determined that prior actions were sufficient, or conducted additional remediation consistent with the selected remedy in the ROD. As the public pressures, regulations, and processes that the FUSRAP encounters continue to change, the program itself continues to evolve. Assessment of VPs at FUSRAP sites is a necessary step in the life cycle of our site management. (authors)

  3. Tier 2 guidelines and remediation of Tebuthiuron on a native prairie site

    Energy Technology Data Exchange (ETDEWEB)

    Bessie, K.; Harckham, N.; Dance, T. [EBA Engineering Consultants Ltd., Calgary, AB (Canada); Burk, A. [EnCana Corp., Calgary, AB (Canada); Stephenson, G. [Stantec Consulting, Guelph, ON (Canada); Corbet, B. [Access Analytical Laboratories Inc., Calgary, AB (Canada)

    2009-10-01

    Tebuthiuron is a sterilant used to control vegetation at upstream and midstream petroleum sites. This article discussed the remediation processes used to reclaim a native prairie site contaminated with tebuthiuron. The site was located within a dry mixed grass natural area. A literature review was conducted to establish soil eco-contact guidelines specific to tebuthiuron. A site-specific ecotoxicity assessment was then conducted using a liquid chromatograph to detect tebuthiuron limits in the contaminated soils. A soil sampling technique was used to delineate the affected areas at the site. Site soils were spiked with various concentrations of tebuthiuron ranging from 0.00003 mg/kg to 3000 mg/kg. Test species included a Folsomia candida, an earthworm, and 4 plant species. The study showed that the invertebrate species were less sensitive to tebuthiuron than the plant species. A groundwater assessment showed that tebuthiuron levels exceeded Tier 1 groundwater remediation guidelines. A multilayer hydro-geological model showed that remediation guidelines were orders of magnitude greater than Tier 1 groundwater remediation. A thermal desorption technique was used to remediate the site. 7 refs., 8 figs.

  4. Hanford site tank waste remediation system programmatic environmental review report

    International Nuclear Information System (INIS)

    Haass, C.C.

    1998-01-01

    The US Department of Energy (DOE) committed in the Tank Waste Remediation System (TWRS) Environmental Impact Statement (EIS) Record of Decision (ROD) to perform future National Environmental Policy Act (NEPA) analysis at key points in the Program. Each review will address the potential impacts that new information may have on the environmental impacts presented in the TWRS EIS and support an assessment of whether DOE's plans for remediating the tank waste are still pursuing the appropriate plan for remediation or whether adjustments to the program are needed. In response to this commitment, DOE prepared a Supplement Analysis (SA) to support the first of these reevaluations. Subsequent to the completion of the SA, the Phase IB negotiations process with private contractors resulted in several changes to the planned approach. These changes along with other new information regarding the TWRS Program have potential implications for Phase 1 and Phase 2 of tank waste retrieval and waste storage and/or disposal that may influence the environmental impacts of the Phased Implementation alternative. This report focuses on identifying those potential environmental impacts that may require NEPA analysis prior to authorization to begin facility construction and operations

  5. Inclusion of social indicators in decision support tools for the selection of sustainable site remediation options.

    Science.gov (United States)

    Cappuyns, Valérie

    2016-12-15

    sustainability of a site remediation project, should be tuned to the legislation, guidelines and procedures that are in force in a specific country or region. Copyright © 2016 Elsevier Ltd. All rights reserved.

  6. Siting of nuclear facilities. Selections from Nuclear Safety

    International Nuclear Information System (INIS)

    Buchanan, J.R.

    1976-07-01

    The report presented siting policy and practice for nuclear power plants as developed in the U.S. and abroad. Twenty-two articles from Nuclear Safety on this general topic are reprinted since they provide a valuable reference source. The appendices also include reprints of some relevant regulatory rules and guides on siting. Advantages and disadvantages of novel siting concepts such as underground containment, offshore siting, and nuclear energy parks are addressed. Other topics include site criteria, risk criteria, and nuclear ship criteria

  7. Siting of nuclear facilities. Selections from Nuclear Safety

    Energy Technology Data Exchange (ETDEWEB)

    Buchanan, J.R.

    1976-07-01

    The report presented siting policy and practice for nuclear power plants as developed in the U.S. and abroad. Twenty-two articles from Nuclear Safety on this general topic are reprinted since they provide a valuable reference source. The appendices also include reprints of some relevant regulatory rules and guides on siting. Advantages and disadvantages of novel siting concepts such as underground containment, offshore siting, and nuclear energy parks are addressed. Other topics include site criteria, risk criteria, and nuclear ship criteria.

  8. Remedial action plan and site design for stabilization of the inactive uranium processing site at Naturita, Colorado

    International Nuclear Information System (INIS)

    1994-03-01

    Attachment 3 Groundwater Hydrology Report describes the hydrogeology, water quality, and water resources at the processing site and Dry Flats disposal site. The Hydrological Services calculations contained in Appendix A of Attachment 3, are presented in a separate report. Attachment 4 Water Resources Protection Strategy describes how the remedial action will be in compliance with the proposed EPA groundwater standards

  9. Remediation of old environmental liabilities in the Nuclear Research Institute Rez plc

    International Nuclear Information System (INIS)

    Svoboda, Karel; Podlaha, Josef

    2011-01-01

    The Nuclear Research Institute Rez plc (NRI) after 55 years of activities in the nuclear field produced some environmental liabilities that shall be remedied. There are three areas of remediation: (1) decommissioning of old obsolete facilities (e.g. decay tanks, RAW treatment technology, special sewage system), (2) processing of RAW from operation and dismantling of nuclear facilities, and (3) elimination of spent fuel from research nuclear reactors operated by the NRI. The goal is to remedy the environmental liabilities and eliminate the potential negative impact on the environment. Remediation of the environmental liabilities started in 2003 and will be finished in 2014. The character of the environmental liabilities is very specific and requires special remediation procedures. Special technologies are being developed with assistance of external subcontractors. The NRI has gained many experiences in the field of RAW management and decommissioning of nuclear facilities and will use its facilities, experienced staff and all relevant data needed for the successful realization of the remediation. The most significant items of environmental liabilities are described in the paper together with information about the history, the current state, the progress, and the future activities in the field of remediation of environmental liabilities in the NRI. (author)

  10. Proceedings of the 2000 contaminated site remediation conference. From source zones to ecosystems. 2 volumes

    International Nuclear Information System (INIS)

    Johnston, C.D.

    2000-01-01

    The conference theme, 'From Source Zones to Ecosystems' , indicate the recognition of the fact that once released into environment, contaminants followed a pathway from the source to the point of impact with an ecosystem or other receptors, consequently care is taken to associate remediation with reducing risk to these receptors. The papers, presented at the conference provide a guide to current practice and future direction of contaminated site remediation in Australia and internationally. Monitored natural attenuation is considered as is an increased body of evidence available to evaluate this approach when managing site contamination for Australian conditions. Remediation strategies for heavy metal contamination appear to be underdeveloped and indeed underrepresented. The phyto remediation is being developed to ameliorate the problem and there is also a focus on the bioavailability of metals and on better defining the risk they pose

  11. Determining the number of samples required for decisions concerning remedial actions at hazardous waste sites

    International Nuclear Information System (INIS)

    Skiles, J.L.; Redfearn, A.; White, R.K.

    1991-01-01

    An important consideration for every risk analyst is how many field samples should be taken so that scientifically defensible decisions concerning the need for remediation of a hazardous waste site can be made. Since any plausible remedial action alternative must, at a minimum, satisfy the condition of protectiveness of human and environmental health, we propose a risk-based approach for determining the number of samples to take during remedial investigations rather than using more traditional approaches such as considering background levels of contamination or federal or state cleanup standards

  12. Remediation of the site of a former active handling building at UKAEA- Winfrith

    International Nuclear Information System (INIS)

    Armitage, Jack; Brown, Nick; Cornell, Rowland; Jessop, Gareth

    2007-01-01

    Available in abstract form only. Full text of publication follows: Since July 2000, NUKEM Limited has been carrying out the decommissioning of the former Active Handling Building, A59 at Winfrith, Dorset, United Kingdom (UK) under contract from the nuclear site licence holder, United Kingdom Atomic Energy Authority, (UKAEA). The building contained two heavily shielded suites of caves originally used to carry out remote examination of irradiated nuclear fuel elements and other supporting facilities which have all been decontaminated ready to permit building demolition. The demolition of the building structure and the removal of one cave line was completed during 2006 and the second cave line was demolished by March 2007. The remaining operations to be completed concern removal of the building slab and remediation of underlying soils to the final end point, free for unrestricted use without planning or nuclear regulatory control. Within the building base slab there are a range of contaminated items including secondary drain pipes, filter pits, storage hole liners and ventilation ducts which all have to be recovered for disposal along with around 4,000 m 3 of surrounding concrete. In order to characterise the slab before its removal, supporting information has been obtained from site investigation work including a collimated low resolution, high sensitivity gamma survey using the GroundhogTM system of the foundation slab and the recovery and analysis of 27 cores obtained by drilling through the slab into the underlying soil. During removal of the slab it will be necessary to employ a variety of monitoring techniques to locate and remove the contaminated sections and then expose and monitor the underlying soil for evidence of any residual radioactivity. (authors)

  13. Environmental assessment of remedial action at the Maybell Uranium Mill Tailings Site near Maybell, Colorado

    International Nuclear Information System (INIS)

    1994-04-01

    The purpose of this environmental assessment (EA) is to evaluate the environmental impacts resulting from remedial action at the Maybell uranium mill tailings site near Maybell, Colorado. A biological assessment (Attachment 1) and a floodplain/wetlands attachments describe the proposed action, affected environment, and environmental impacts associated with the proposed remedial action, including impacts to threatened and endangered species listed or proposed for listing by the US Fish and Wildlife Service (FWS)

  14. Contaminated Land Remediation on decommissioned nuclear facilities: an optimized approach

    International Nuclear Information System (INIS)

    Sauer, Emilie

    2016-01-01

    The site of the Monts d'Arree located in Brennilis in the area of Brittany in France is a former 70 MWe heavy water reactor. EDF is now in charge of its decommissioning. The effluent treatment facility (STE) is currently being dismantled. As the future use of the site will exclude any nuclear activity, EDF is taking site release into consideration. Therefore a land management strategy for the land and soil is needed. An optimized approach is being proposed for the STE, to the French Regulator. In France, there is no specific regulation related to contaminated land (either radiologically contaminated or chemically contaminated). The French Nuclear Safety Authority's doctrine for radioactively contaminated land is a reference approach which involves complete clean-up, removing any trace of artificial radioactivity in the ground. If technical difficulties are encountered or the quantity of radioactive waste produced is too voluminous, an optimised clean-up can be implemented. EDF has been engaged since 2008 in drawing up a common guideline with other French nuclear operators (CEA and AREVA). The operators' guideline proposed the first steps to define how to optimise nuclear waste and to carry out a cost-benefits analysis. This is in accordance with the IAEA's prescriptions. Historically, various incidents involving effluent drum spills caused radiological contamination in the building platform and the underlying soil. While conducting the decontamination works in 2004/2005, it was impossible to remove all contamination (that went deeper than expected). A large characterization campaign was carried out in order to map the contamination. For the site investigation, 34 boreholes were drilled from 2 to 5 m under the building platform and 98 samples were analyzed to search for gamma, beta and alpha emitters. With the results, the contamination was mapped using a geostatistical approach developed by Geovariances TM . Main results were: - Soils are

  15. Maywood Interim Storage Site: Annual site environmental report, Maywood, New Jersey, Calendar year 1986: Formerly Utilized Sites Remedial Action Program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1987-06-01

    During 1986, the environmental monitoring program was continued at the Maywood Interim Storage Site (MISS), a US Department of Energy (DOE) facility located in the Borough of Maywood and the Township of Rochelle Park, New Jersey. The MISS is presently used for the storage of low-level radioactively contaminated soils. The MISS is part of the Formerly Utilized Sites Remedial Action Program (FUSRAP). As part of the decontamination research and development project authorized by Congress under the 1984 Energy and Water Appropriations Act, remedial action and environmental monitoring programs are being conducted at this site and at vicinity properties by Bechtel National, Inc., Project Management Contractor for FUSRAP. The monitoring program at the MISS measures thoron and radon gas concentrations in air; external gamma radiation levels; and thorium, uranium, and radium concentrations in surface water, groundwater, and sediment. To verify that the site is in compliance with the DOE radiation protection standard (100 mrem/y) and to assess the potential effect on public health, the radiation dose was calculated for the maximally exposed individual. Based on the conservative scenario described in the report, the maximally exposed individual would receive an annual external exposure approximately equivalent to 1% of the DOE radiation protection standard of 100 mrem/y. This exposure is less than the exposure a person would receive during a round-trip flight from New York to Los Angeles (due to greater amounts of cosmic radiation at higher altitudes). The cumulative dose to the population within an 80-km (50-mi) radius of the MISS that would result from radioactive materials present at the site would be indistinguishable from the dose the same population would receive from naturally occurring radioactive sources. Results of the 1986 monitoring show that the MISS is in compliance with the DOE radiation protection standard. 16 refs., 8 figs., 15 tabs.

  16. Interim remedial measures proposed plan for the 200-ZP-1 Operable Unit, Hanford Site, Washington

    International Nuclear Information System (INIS)

    Parker, D.L.

    1993-12-01

    The purpose of this interim remedial measures (IRM) proposed plan is to present and solicit public comments on the IRM planned for the 200-ZP-1 Operable Unit at the Hanford Site in Washington state. The 200-ZP-1 is one of two operable units that envelop the groundwater beneath the 200 West Area of the Hanford Site

  17. Factors for assessment of human health risk associated with remedial action at hazardous waste sites

    International Nuclear Information System (INIS)

    Stephenson, D.E.; King, C.M.; Looney, B.B.; Holmes, W.G.; Gordon, D.E.

    1985-01-01

    A risk assessment strategy that is cost effective and minimized human health risks was developed for closure of hazardous waste sites at the Savannah River Plant. The strategy consists of (1) site characterization, (2) contaminant transport modeling, and (3) determination of relative merits of alternative remedial actions according to the degree of health protection they provide

  18. Environmental assessment of remedial action at the inactive uraniferous lignite ashing sites at Belfield and Bowman, North Dakota

    International Nuclear Information System (INIS)

    1993-09-01

    The Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978 authorized the US Department of Energy (DOE) to perform remedial actions at Belfield and Bowman inactive lignite ashing sites in southwestern North Dakota to reduce the potential public health impacts from the residual radioactivity remaining at the sites. The US Environmental Protection Agency (EPA) promulgated standards (40 CFR 192) that contain measures to control the residual radioactive materials and other contaminated materials, and proposed standards to protect the groundwater from further degradation. Remedial action at the Belfield and Bowman sites must be performed in accordance with these standards and with the concurrence of the US Nuclear Regulatory Commission (NRC) and the state of North Dakota. The Belfield and Bowman designated sites were used by Union Carbide and Kerr-McGee, respectively, to process uraniferous lignite in the 1960s. Uranium-rich ash from rotary kiln processing of the lignite was loaded into rail cars and transported to uranium mills in Rifle, Colorado, and Ambrosia Lake, New Mexico, respectively. As a result of the ashing process, there is a total of 158,400 cubic yards (yd 3 ) [121,100 cubic meters (m 3 )] of radioactive ash-contaminated soils at the two sites. Windblown ash-contaminated soil covers an additional 21 acres (8.5 ha) around the site, which includes grazing land, wetlands, and a wooded habitat

  19. Waste site characterization and remediation: Problems in developing countries

    Energy Technology Data Exchange (ETDEWEB)

    Kalavapudi, M. [ENVIROSYS, Gaithersburg, MD (United States); Iyengar, V. [Biomineral Sciences International Inc., Bethesda, MD (United States)

    1996-12-31

    Increased industrial activities in developing countries have degraded the environment, and the impact on the environment is further magnified because of an ever-increasing population, the prime receptors. Independent of the geographical location, it is possible to adopt effective strategies to solve environmental problems. In the United States, waste characterization and remediation practices are commonly used for quantifying toxic contaminants in air, water, and soil. Previously, such procedures were extraneous, ineffective, and cost-intensive. Reconciliation between the government and stakeholders, reinforced by valid data analysis and environmental exposure assessments, has allowed the {open_quotes}Brownfields{close_quotes} to be a successful approach. Certified reference materials and standard reference materials from the National Institute of Standards (NIST) are indispensable tools for solving environmental problems and help to validate data quality and the demands of legal metrology. Certified reference materials are commonly available, essential tools for developing good quality secondary and in-house reference materials that also enhance analytical quality. This paper cites examples of environmental conditions in developing countries, i.e., industrial pollution problems in India, polluted beaches in Brazil, and deteriorating air quality in countries, such as Korea, China, and Japan. The paper also highlights practical and effective approaches for remediating these problems. 23 refs., 7 figs., 1 tab.

  20. Environmental assessment of remedial action at the Naturita Uranium processing site near Naturita, Colorado

    International Nuclear Information System (INIS)

    1993-08-01

    The proposed remedial action for the Naturita processing site is relocation of the contaminated materials and debris to the Dry Flats disposal site, 6 road miles (mi) [ 1 0 kilometers (km)] to the southeast. At the disposal site, the contaminated materials would be stabilized and covered with layers of earth and rock. The proposed disposal site is on land administered by the Bureau of Land Management (BLM) and used primarily for livestock grazing. The final disposal site would cover approximately 57 ac (23 ha), which would be permanently transferred from the BLM to the DOE and restricted from future uses. The remedial action activities would be conducted by the DOE's Uranium Mill Tailings Remedial Action (UMTRA) Project. The remedial action would result in the loss of approximately 164 ac (66 ha) of soils, but 132 ac (53 ha) of these soils are contaminated and cannot be used for other purposes. Another 154 ac (62 ha) of soils would be temporarily disturbed. Approximately 57 ac (23 ha) of open range land would be permanently removed from livestock grazing and wildlife use. The removal of the contaminated materials would affect the 1 00-year floodplain of the San Miguel River and would result in the loss of riparian habitat along the river. The southwestern willow flycatcher, a Federal candidate species, may be affected by the remedial action, and the use of water from the San Miguel River ''may affect'' the Colorado squawfish, humpback chub, bonytail chub, and razorback sucker. Traffic levels on State Highways 90 and 141 would be increased during the remedial action, as would the noise levels along these transportation routes. Measures for mitigating the adverse environmental impacts of the proposed remedial action are discussed in Section 6.0 of this environmental assessment (EA)

  1. Environmental assessment of remedial action at the Naturita Uranium processing site near Naturita, Colorado. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1993-08-01

    The proposed remedial action for the Naturita processing site is relocation of the contaminated materials and debris to the Dry Flats disposal site, 6 road miles (mi) [ 1 0 kilometers (km)] to the southeast. At the disposal site, the contaminated materials would be stabilized and covered with layers of earth and rock. The proposed disposal site is on land administered by the Bureau of Land Management (BLM) and used primarily for livestock grazing. The final disposal site would cover approximately 57 ac (23 ha), which would be permanently transferred from the BLM to the DOE and restricted from future uses. The remedial action activities would be conducted by the DOE`s Uranium Mill Tailings Remedial Action (UMTRA) Project. The remedial action would result in the loss of approximately 164 ac (66 ha) of soils, but 132 ac (53 ha) of these soils are contaminated and cannot be used for other purposes. Another 154 ac (62 ha) of soils would be temporarily disturbed. Approximately 57 ac (23 ha) of open range land would be permanently removed from livestock grazing and wildlife use. The removal of the contaminated materials would affect the 1 00-year floodplain of the San Miguel River and would result in the loss of riparian habitat along the river. The southwestern willow flycatcher, a Federal candidate species, may be affected by the remedial action, and the use of water from the San Miguel River ``may affect`` the Colorado squawfish, humpback chub, bonytail chub, and razorback sucker. Traffic levels on State Highways 90 and 141 would be increased during the remedial action, as would the noise levels along these transportation routes. Measures for mitigating the adverse environmental impacts of the proposed remedial action are discussed in Section 6.0 of this environmental assessment (EA).

  2. Environmental assessment of remedial action at the Slick Rock uranium mill tailings sites Slick Rock, Colorado. Draft

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-06-01

    The Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA) authorized the US Department of Energy (DOE) to clean up two uranium mill tailings processing sites near Slick Rock, Colorado, in San Miguel County. The purpose of the cleanup is to reduce the potential health effects associated with the radioactive materials remaining on the sites and on vicinity properties (VP) associated with the sites. The US Environmental Protection Agency (EPA) promulgated standards for the UMTRCA that contained measures to control the contaminated materials and to protect the groundwater from further degradation. Remedial actions at the Slick Rock sites must be performed in accordance with these standards and with the concurrence of the US Nuclear Regulatory Commission (NRC).

  3. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Gunnison, Colorado

    International Nuclear Information System (INIS)

    1992-10-01

    To achieve compliance with the proposed US Environmental Protection Agency (EPA) groundwater protection standards the US Department of Energy (DOE) proposes to meet background concentrations or the EPA maximum concentration limits (MCLS) for hazardous constituents in groundwater in the uppermost aquifer at the point of compliance (POC) at the Gunnison Uranium Mill Tailings Remedial Action (UMTRA) Project disposal site near Gunnison, Colorado. The proposed remedial action will ensure protection of human health and the environment. A summary of the principal features of the water resources protection strategy for the Gunnison disposal site is included in this report

  4. Application of in situ measurement for site remediation and final status survey of decommissioning KRR site

    Energy Technology Data Exchange (ETDEWEB)

    Hong, Sang Bum; Nam, Jong Soo; Choi, Yong Suk; Seo, Bum Kyoung; Moon, Jei Kwon [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2016-06-15

    In situ gamma spectrometry has been used to measure environmental radiation, assumptions are usually made about the depth distribution of the radionuclides of interest in the soil. The main limitation of in situ gamma spectrometry lies in determining the depth distribution of radionuclides. The objective of this study is to develop a method for subsurface characterization by in situ measurement. The peak to valley method based on the ratio of counting rate between the photoelectric peak and Compton region was applied to identify the depth distribution. The peak to valley method could be applied to establish the relation between the spectrally derived coefficients (Q) with relaxation mass per unit area (β) for various depth distribution in soil. The in situ measurement results were verified by MCNP simulation and calculated correlation equation. In order to compare the depth distributions and contamination levels in decommissioning KRR site, in situ measurement and sampling results were compared. The in situ measurement results and MCNP simulation results show a good correlation for laboratory measurement. The simulation relationship between Q and source burial for the source layers have exponential relationship for a variety depth distributions. We applied the peak to valley method to contaminated decommissioning KRR site to determine a depth distribution and initial activity without sampling. The observed results has a good correlation, relative error between in situ measurement with sampling result is around 7% for depth distribution and 4% for initial activity. In this study, the vertical activity distribution and initial activity of {sup 137}Cs could be identifying directly through in situ measurement. Therefore, the peak to valley method demonstrated good potential for assessment of the residual radioactivity for site remediation in decommissioning and contaminated site.

  5. Underground Nuclear Testing Program, Nevada Test Site

    International Nuclear Information System (INIS)

    1975-09-01

    The Energy Research and Development Administration (ERDA) continues to conduct an underground nuclear testing program which includes tests for nuclear weapons development and other tests for development of nuclear explosives and methods for their application for peaceful uses. ERDA also continues to provide nuclear explosive and test site support for nuclear effects tests sponsored by the Department of Defense. This Supplement extends the Environmental Statement (WASH-1526) to cover all underground nuclear tests and preparations for tests of one megaton (1 MT) or less at the Nevada Test Site (NTS) during Fiscal Year 1976. The test activities covered include numerous continuing programs, both nuclear and non-nuclear, which can best be conducted in a remote area. However, if nuclear excavation tests or tests of yields above 1 MT or tests away from NTS should be planned, these will be covered by separate environmental statements

  6. What's the point? The contribution of a sustainability view in contaminated site remediation.

    Science.gov (United States)

    Anderson, Robert; Norrman, Jenny; Back, Pär-Erik; Söderqvist, Tore; Rosén, Lars

    2018-07-15

    Decision support tools (DST) are often used in remediation projects to aid in the complex decision on how best to remediate a contaminated site. In recent years, the sustainable remediation concept has brought increased attention to the often-overlooked contradictory effects of site remediation, with a number of sustainability assessment tools now available. The aim of the present study is twofold: (1) to demonstrate how and when different assessment views affect the decision support outcome on remediation alternatives in a DST, and (2) to demonstrate the contribution of a full sustainability assessment. The SCORE tool was used in the analysis; it is based on a holistic multi-criteria decision analysis (MCDA) approach, assessing sustainability in three dimensions: environmental, social, and economic. Four assessment scenarios, compared to a full sustainability assessment, were considered to reflect different possible assessment views; considering public and private problem owner perspectives, as well as green and traditional assessment scopes. Four real case study sites in Sweden were analyzed. The results show that the decision support outcome from a full sustainability assessment most often differs to that of other assessment views, and results in remediation alternatives which balance trade-offs in most of the scenarios. In relation to the public perspective and traditional scope, which is seen to lead to the most extensive and expensive remediation alternatives, the trade-off is related to less contaminant removal in favour of reduced negative secondary effects such as emissions and waste disposal. Compared to the private perspective, associated with the lowest cost alternatives, the trade-off is higher costs, but more positive environmental and social effects. Generally, both the green and traditional assessment scopes miss out on relevant social and local environmental secondary effects which may ultimately be very important for the actual decision in a

  7. Case study of manufactured gas plant site remediations using thermal desorption

    Energy Technology Data Exchange (ETDEWEB)

    Vogel, R.G.; Hayes, T.; Slimon, K.F.; Unites, D. [Southern California Gas Company, Los Angeles, CA (United States)

    1995-12-31

    Southern California Gas Company (SoCal Gas) has recently remediated five of its former manufactured gas plant (MGP) sites using on-site and off-site thermal desorption. This technology has proven effective in the treatment of PAH-contaminated soils with widely variable concentrations. At two of the five sites, MGP-contaminated materials were excavated and thermally treated on site. At the other sites, MGP-contaminated materials were excavated and transported directly to an off-site thermal desorber. Much of the production was of oil-gas, giving lampblack contamination, but some coal tar was also present.

  8. Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Slick Rock, Colorado: Remedial Action Selection Report. Preliminary final

    Energy Technology Data Exchange (ETDEWEB)

    1994-03-01

    This proposed remedial action plan incorporates the results of detailed investigation of geologic, geomorphic, and seismic conditions at the proposed disposal site. The proposed remedial action will consist of relocating the uranium mill tailings, contaminated vicinity property materials, demolition debris, and windblown/waterborne materials to a permanent repository at the proposed Burro Canyon disposal cell. The proposed disposal site will be geomorphically stable. Seismic design parameters were developed for the geotechnical analyses of the proposed cell. Cell stability was analyzed to ensure long-term performance of the disposal cell in meeting design standards, including slope stability, settlement, and liquefaction potential. The proposed cell cover and erosion protection features were also analyzed and designed to protect the RRM (residual radioactive materials) against surface water and wind erosion. The location of the proposed cell precludes the need for permanent drainage or interceptor ditches. Rock to be used on the cell top-, side-, and toeslopes was sized to withstand probable maximum precipitation events.

  9. Maryland State information handbook: formerly utilized sites remedial action program

    International Nuclear Information System (INIS)

    1980-01-01

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Handbook Series Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Maryland. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations

  10. Maryland State information handbook: formerly utilized sites remedial action program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-12-31

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Handbook Series Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Maryland. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

  11. Economic opportunities from military remediation sites in California

    International Nuclear Information System (INIS)

    Wood, P.J.

    1994-01-01

    The number of base closures occurring nationwide has created an urgent need to develop new and innovative technologies for cleaning up toxic contamination. Traditional methods for characterizing and remediating contamination at military installations, and elsewhere, have not resulted in timely, efficient and cost-effective cleanups. Past industrial and waste management practices conducted at California bases have resulted in contamination of the soil and ground water by a variety of chemical contaminants. Cleaning solvents and fuel wastes are the most prevalent contamination found at military installations. However, other less common types of contamination may also be present in significant quantities at specific bases. Environmental contamination resulting from leaking underground fuel tanks is also prevalent at California military installations. Common fuels present at military bases include gasoline diesel, bunker fuel, and JP-4 and JP-5 jet fuels. The California Environmental Protection Agency (Cal/EPA) is actively involved in efforts to encourage the development of new environmental technologies, especially at closing military installations

  12. Sustainable geoengineering projects for the remediation of mine site

    Science.gov (United States)

    Martínez-Sanchez, Maria Jose; Perez-Sirvent, Carmen; Garcia-Lorenzo, Maria Luz; Martinez-Lopez, Salvadora; Gonzalez, Eva; Perez-Espinosa, Victor; Molina-Ruiz, Jose; Belen Martinez, Lucia; Hernandez, Carmen; Bech, Jaime; Hernandez-Cordoba, Manuel

    2015-04-01

    A large number of soils are contaminated by heavy metals due to mining activities, generating adverse effects on human health and the environment. In response to these negative effects, a variety of technologies have been developed. In situ immobilization by means of soil amendment is a non-intrusive and cost effective alternative that transforms the highly mobile toxic heavy metals to physico-chemically stable forms. Limestone filler is a good selection for such a purpose, because of its characteristics. In addition, the use of this amendment could revalorize the residues, reducing the costs of the process. The objective of this work was to evaluate the effectiveness of an immobilization technique in sediments contaminated by heavy metals. Two experimental areas, approximately 1 Ha each one, were selected, and technosols were developed as follows: original sediments, sediments mixed with limestone filler in a 1:1 proportion, gravel to avoid capillary and natural soil to allow plant growth. After the remediation technique was applied, monitoring was done in 18 points collecting samples (sediment and water) during a 4 years period at two month intervals. The pH and electrical conductivity as well as the heavy metal (Zn, Pb, Cd, Cu and As) contents were measured. Microtox bioassay was also applied. Sediments before the remediation technique showed acidic pH, high EC values and high trace elements content. The results obtained after the immobilization showed that sediment samples had neutral pH (average value of 8.3) low electrical conductivity (1.32 dS m-1) and low trace elements concentration. It can be concluded that the use of limestone filler is an excellent option in sediments polluted because of the risk for human health or ecosystem disappears or is decreased in a large extent. In addition, the designed experience allows stabilizer proportion to be optimized and may suppose a big cost-saving in the project in areas affected by mining activities.

  13. Innovative approaches to remediation for VOC sites using recirculating wells

    International Nuclear Information System (INIS)

    Dawson, G.W.

    1996-01-01

    In-well air stripping with approaches such as the patented NoVOCs system offer both cost and operational advantages over pump and treat, and in situ air sparging technologies. With in-well stripping, the water is treated in the well and discharged without being brought to the surface. Discharged water is circulated through the saturated zone acting as a carrier to continually flush contaminants from the aquifer matrix and transport them to the well for treatment. With pumping rates up to four times those of comparable extraction wells, large radii of influence can be maintained and remediation is achieved faster and more efficiently. In-well stripping is applicable to any strippable contaminant including chlorinated solvents (i.e., TCE and PCE) and hydrocarbons such as the aromatic components in petroleum fuels. Growing costs associated with water discharge, NPDES permits, water rights and, in some areas, salt water intrusion have provided economic incentives to retrofit existing pump and treat systems with NoVOCs units. A large number of wells are amenable to retrofitting depending on their diameter, location and length of screens, and back fill. Even with the new initiatives for intrinsic remediation for petroleum fuel releases, there is a role for the NoVOCs technology. Free product removal wells based on the NoVOCs design eliminate the need to treat and permit water discharges produced when generating a cone of depression for collecting the floating fuel. Additionally, the stripping action and introduction of dissolved oxygen reduce soluble hydrocarbon concentrations to risk levels that can be easily addressed through intrinsic bioremediation

  14. Safety analysis and hazard classification for the 100-B/C Site Remediation Project, Phase 1. Revision 1

    International Nuclear Information System (INIS)

    Adam, W.J.; Lehrschall, R.R.; Oestreich, D.K.

    1996-07-01

    The purpose of this report is to document the preliminary hazard classification (PHC) for the initial group of sites to be remediated by the 100-B/C Site Remediation Project. The project is targeted at excavation of contaminated solid from seven waste sites, and the transportation and disposal of these wastes at the Environmental Restoration Disposal Facility. The PHC for these remediation activities is rated as radiological

  15. Remediation options and the significance of water treatment at former uranium production sites in Eastern Germany

    International Nuclear Information System (INIS)

    Gatzweiler, R.; Jakubick, A.T.; Kiessig, G.

    2000-01-01

    The WISMUT remediation project in the States of Saxony and Thuringia, Germany, comprises several mine and mill sites including large volumes of production residues. Due to the climate, the intensive land use and the regulatory conditions, the water path is most important in evaluating remediation options. Water treatment is an integral part of mine flooding, mine dump and tailings remediation, and treatment costs represent a major portion of the overall costs of the project. Uncertainties in the estimations of quantities of mine and seepage waters, variations in quality from site to site, and changing conditions in time demand a strategic approach to the selection and optimization of water treatment methods. The paper describes options considered and experience gained including efforts to limit long-term treatment costs by developing and applying passive treatment systems and negotiating acceptable discharge limits. (author)

  16. Visitor centres at nuclear facility sites

    International Nuclear Information System (INIS)

    1993-01-01

    Communications strategies in the nuclear field are often based on the creation of visitor centres at nuclear facility sites. Today, the design, as well as the realization and management of such centres has become a specialized function, and its role is very complementary to the nuclear operator's. It also uses the latest technology in the field of audio-visual, experiment and interactivity. This publication contains the proceedings of an international seminar organized by the OECD Nuclear Energy Agency on the role of visitor centres at nuclear facility sites. It includes the main papers presented at this Seminar

  17. Site survey for nuclear power plants

    International Nuclear Information System (INIS)

    1984-01-01

    This Safety Guide describes the first stage of the siting process for nuclear power plants - the site survey to select one or more preferred candidate sites. Its purpose is to recommend procedures and provide information for use in implementing a part of the Code of Practice on Safety in Nuclear Power Plant Siting (IAEA Safety Series No.50-C-S). The organization, procedures, methodologies, guidance for documenting the site survey process and examples of detailed procedures on some safety-related site characteristics are given in the Guide

  18. Screening of groundwater remedial alternatives for brownfield sites: a comprehensive method integrated MCDA with numerical simulation.

    Science.gov (United States)

    Li, Wei; Zhang, Min; Wang, Mingyu; Han, Zhantao; Liu, Jiankai; Chen, Zhezhou; Liu, Bo; Yan, Yan; Liu, Zhu

    2018-06-01

    Brownfield sites pollution and remediation is an urgent environmental issue worldwide. The screening and assessment of remedial alternatives is especially complex owing to its multiple criteria that involves technique, economy, and policy. To help the decision-makers selecting the remedial alternatives efficiently, the criteria framework conducted by the U.S. EPA is improved and a comprehensive method that integrates multiple criteria decision analysis (MCDA) with numerical simulation is conducted in this paper. The criteria framework is modified and classified into three categories: qualitative, semi-quantitative, and quantitative criteria, MCDA method, AHP-PROMETHEE (analytical hierarchy process-preference ranking organization method for enrichment evaluation) is used to determine the priority ranking of the remedial alternatives and the solute transport simulation is conducted to assess the remedial efficiency. A case study was present to demonstrate the screening method in a brownfield site in Cangzhou, northern China. The results show that the systematic method provides a reliable way to quantify the priority of the remedial alternatives.

  19. Use of technical and economic analysis for optimizing technology selection and remedial design for contaminated sites

    International Nuclear Information System (INIS)

    Hardisty, P.E.; Brown, A.

    1996-01-01

    The decision to remediate a contaminated site can be seen from the macroeconomic and microeconomic viewpoints. Macroeconomics can be used to plan and account for the overall cost of pollution as part of a firm's production, and thus make overall decisions on the real cost of pollution and the level of clean-up which may be called for. Valuation of damaged resources, option values and intrinsic worth is an important part of this process. Once the decision to remediate has been taken, the question becomes how best to remediate. Microeconomic analysis deals with providing efficient allocative decisions for reaching specified goals. it is safe to say that cost is one of the single most important factors in site clean-up decision making. A basic rule of remediation is often taken to be the maximization of contaminant mass removed per dollar spent. However, remediation may also be governed by other objectives and constraints. In some situations, minimization of time, rather than cost, could be the constraint. Or perhaps the objective could be to achieve a set level of clean-up for the lowest possible cost, even if a large program would result in unit-cost reductions. Evaluation of the economics of a clean-up project is directly linked to the objectives of the site owner, and the constraints within which the remediation is to be performed. Economic analysis of remedial options for containment of a 350,000 L hydrocarbon spill migrating through fractured rock into a river in Alberta, Canada, clear direction to the site owner

  20. Coordinating bifurcated remediation of soil and groundwater at sites containing multiple operable units

    International Nuclear Information System (INIS)

    Laney, D.F.

    1996-01-01

    On larger and/or more complex sites, remediation of soil and groundwater is sometimes bifurcated. This presents some unique advantages with respect to expedited cleanup of one medium, however, it requires skillful planning and significant forethought to ensure that initial remediation efforts do not preclude some long-term options, and/or unduly influence the subsequent selection of a technology for the other operable units and/or media. this paper examines how the decision to bifurcate should be approached, the various methods of bifurcation, the advantages and disadvantages of bifurcation, and the best methods to build flexibility into the design of initial remediation systems so as to allow for consideration of a fuller range of options for remediation of other operable units and/or media at a later time. Pollutants of concern include: metals; petroleum hydrocarbons; and chlorinated solvents

  1. Biological assessment of remedial action at the abandoned uranium mill tailings site near Naturita, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    Pursuant to the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, the U.S. Department of Energy (DOE) is proposing to conduct remedial action to clean up the residual radioactive materials (RRM) at the Naturita uranium processing site in Colorado. The Naturita site is in Montrose County, Colorado, and is approximately 2 miles (mi) (3 kilometer [km]) from the unincorporated town of Naturita. The proposed remedial action is to remove the RRM from the Naturita site to the Upper Burbank Quarry at the Uravan disposal site. To address the potential impacts of the remedial action on threatened and endangered species, the DOE prepared this biological assessment. Informal consultations with the U.S. Department of the Interior, Fish and Wildlife Service (FWS) were initiated in 1986, and the FWS provided a list of the threatened and endangered species that may occur in the Naturita study area. This list was updated by two FWS letters in 1988 and by verbal communication in 1990. A biological assessment was included in the environmental assessment (EA) of the proposed remedial action that was prepared in 1990. This EA addressed the impacts of moving the Naturita RRM to the Dry Flats disposal site. In 1993, the design for the Dry Flats disposal alternative was changed. The FWS was again consulted in 1993 and provided a new list of threatened and endangered species that may occur in the Naturita study area. The Naturita EA and the biological assessment were revised in response to these changes. In 1994, remedial action was delayed because an alternate disposal site was being considered. The DOE decided to move the FIRM at the Naturita site to the Upper Burbank Quarry at the Uravan site. Due to this delay, the FWS was consulted in 1995 and a list of threatened and endangered species was provided. This biological assessment is a revision of the assessment attached to the Naturita EA and addresses moving the Naturita RRM to the Upper Burbank Quarry disposal site.

  2. Radiological guidelines for application to DOE's Formerly Utilized Sites Remedial Action Program. [FUSRAP sites

    Energy Technology Data Exchange (ETDEWEB)

    1983-03-01

    The US Department of Energy has implemented a program to evaluate and, where necessary, take action to protect the public from contamination at sites that were used in the past to process and/or store radioactive materials for the former US Army Corps of Engineers Manhattan Engineer District or the US Atomic Energy Commission. The program is identified as the Formerly Utilized Sites Remedial Action Program (FUSRAP). This document describes methods considered appropriate for the evaluation of health effects that might possible be caused by radioactive contamination at FUSRAP sites. This assessment methodology is applied to a typical site for the purposeof deriving guidelines for the cleanup of contaminated soil. Additional guidance is provided for planning site-specific remedial action that is consistent with the overall objectives of FUSRAP.

  3. Environmental assessment of remedial action at the Lakeview Uranium Mill Tailings Site, Lakeview, Oregon: Volume 2, Appendices

    International Nuclear Information System (INIS)

    1985-04-01

    This document assesses and compares the environmental impacts of various alternatives for remedial action at the Lakeview uranium mill tailings site located one mile north of Lakeview, Oregon. The site covers 256 acres and contains 30 acres of tailings, 69 acres of evaporation ponds, and 25 acres of windblown materials. Remedial actions must be performed in accordance with standards and with the concurrence of the Nuclear Regulatory Commission. Three alternatives have been addressed in this document. The first alternative (the proposed action) is relocation of all contaminated materials to the Collins Ranch site. The contaminated materials would be consolidated into an embankment constructed partially below grade and covered with radon protection and erosion protection covers. A second alternative would relocate the tailings to the Flynn Ranch site and dispose of the contaminated materials in a slightly below grade embankment. A radon protection and erosion protection cover system would also be installed. The no-action alternative is also assessed. Stabilization in place is not considered due to potential seismic and geothermal hazards associated with the current tailings site, and the inability to meet EPA standards. Volume 2 contains 11 appendices

  4. Modifications to the Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Green River, Utah

    International Nuclear Information System (INIS)

    1991-10-01

    This modification to the Green River Final Remedial Action Plan (FRAP) represents the changes made to the document in accordance with a joint agreement between the US Department of Energy (DOE) and the US Nuclear Regulatory Commission (NRC) outlined in a letter dated August 7, 1991. As specified in this letter, methylene chloride will no longer be analyzed in groundwater samples collected from on-site monitor wells. All references to methylene chloride sampling have been deleted from the FRAP, as indicated by the pages in Section 2.0 of this document

  5. Groundwater remediation of hexavalent chromium along the Columbia River at the Hanford site in Washington state, USA - 59030

    International Nuclear Information System (INIS)

    Foss, Dyan L.; Charboneau, Briant L.

    2012-01-01

    The U.S. Department of Energy Hanford Site, formerly used for nuclear weapons production, encompasses 1500 square kilometers in southeast Washington State along the Columbia River. A principle threat to the river are the groundwater plumes of hexavalent chromium (Cr(VI)), which affect approximately 9.8 square kilometers, and 4.1 kilometers of shoreline. Cleanup goals are to stop Cr(VI) from entering the river by the end of 2012 and remediate the groundwater plumes to the drinking water standards by the end of 2020. Five groundwater pump-and-treat systems are currently in operation for the remediation of Cr(VI). Since the 1990's, over 13.6 billion L of groundwater have been treated; over 1, 435 kg of Cr(VI) have been removed. This paper describes the unique aspects of the site, its environmental setting, hydrogeology, groundwater-river interface, riverine hydraulic effects, remediation activities completed to date, a summary of the current and proposed pump-and-treat operations, the in situ redox manipulation barrier, and the effectiveness of passive barriers, resins, and treatability testing results of calcium polysulfide, bio-stimulation, and electrocoagulation, currently under evaluation. (authors)

  6. Executive summary: Weldon Spring Site Environmental Report for calendar year 1992. Weldon Spring Site Remedial Action Project, Weldon Spring, Missouri

    Energy Technology Data Exchange (ETDEWEB)

    1993-06-01

    This report has been prepared to provide information about the public safety and environmental protection programs conducted by the Weldon Spring Site Remedial Action Project. The Weldon Spring site is located in southern St. Charles County, Missouri, approximately 48 km (30 mi) west of St. Louis. The site consists of two main areas, the Weldon Spring Chemical Plant and raffinate pits and the Weldon Spring Quarry. The objectives of the Site Environmental Report are to present a summary of data from the environmental monitoring program, to characterize trends and environmental conditions at the site, and to confirm compliance with environmental and health protection standards and requirements. The report also presents the status of remedial activities and the results of monitoring these activities to assess their impacts on the public and environment. The scope of the environmental monitoring program at the Weldon Spring site has changed since it was initiated. Previously, the program focused on investigations of the extent and level of contaminants in the groundwater, surface waters, buildings, and air at the site. In 1992, the level of remedial activities required monitoring for potential impacts of those activities, particularly on surface water runoff and airborne effluents. This report includes monitoring data from routine radiological and nonradiological sampling activities. These data include estimates of dose to the public from the Weldon Spring site; estimates of effluent releases; and trends in groundwater contaminant levels. Also, applicable compliance requirements, quality assurance programs, and special studies conducted in 1992 to support environmental protection programs are reviewed.

  7. Case studies of community relations on DOE's Formerly Utilized Sites Remedial Action Program as models for Superfund sites

    International Nuclear Information System (INIS)

    Plant, S.W.; Adler, D.G.

    1995-01-01

    Ever since the US Department of Energy (DOE) created its Formerly Utilized Sites Remedial Action Program (FUSRAP) in 1974, there has been a community relations program. The community relations effort has grown as FUSRAP has grown. With 20 of 46 sites now cleaned up, considerable experience in working with FUSRAP stakeholders has been gained. Why not share that experience with others who labor on the Superfund sites? Many similarities exist between the Superfund sites and FUSRAP. FUSRAP is a large, multiple-site environmental restoration program. The challenges range from small sites requiring remedial actions measurable in weeks to major sites requiring the full remedial investigation/feasibility study process. The numerous Superfund sites throughout the United States offer the same diversity, both geographically and technically. But before DOE offers FUSRAP's community relations experience as a model, it needs to make clear that this will be a realistic model. As experiences are shared, DOE will certainly speak of the efforts that achieved its goals. But many of the problems that DOE encountered along the way will also be related. FUSRAP relies on a variety of one- and two-way communication techniques for involving stakeholders in the DOE decision-making process. Some of the techniques and experiences from the case studies are presented

  8. Determining site-specific background level with geostatistics for remediation of heavy metals in neighborhood soils

    Directory of Open Access Journals (Sweden)

    Tammy M. Milillo

    2017-03-01

    Full Text Available The choice of a relevant, uncontaminated site for the determination of site-specific background concentrations for pollutants is critical for planning remediation of a contaminated site. The guidelines used to arrive at concentration levels vary from state to state, complicating this process. The residential neighborhood of Hickory Woods in Buffalo, NY is an area where heavy metal concentrations and spatial distributions were measured to plan remediation. A novel geostatistics based decision making framework that relies on maps generated from indicator kriging (IK and indicator co-kriging (ICK of samples from the contaminated site itself is shown to be a viable alternative to the traditional method of choosing a reference site for remediation planning. GIS based IK and ICK, and map based analysis are performed on lead and arsenic surface and subsurface datasets to determine site-specific background concentration levels were determined to be 50 μg/g for lead and 10 μg/g for arsenic. With these results, a remediation plan was proposed which identified regions of interest and maps were created to effectively communicate the results to the environmental agencies, residents and other interested parties.

  9. Remediation System Evaluation, Douglas Road Landfill Superfund Site

    Science.gov (United States)

    The Douglas Road Landfill Superfund Site is located in St. Joseph County just north of Mishawaka,Indiana. The site consists of a 16-acre capped landfill located on an approximately 32-acre lot (includingthe land purchased in 1999 for a wetlands...

  10. Remediation System Evaluation, Northwest Pipe and Casing Site

    Science.gov (United States)

    The Northwest Pipe and Casing Site is located in Clackamas, Oregon, approximately 20 miles southeastof Portland. The site consists of approximately 53 acres, and has historically been divided into two parcels(Parcel A to the north and Parcel B to the..

  11. Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Rifle, Colorado. Volume 2, Appendices D and E: Final report

    Energy Technology Data Exchange (ETDEWEB)

    1992-02-01

    This appendix assesses the present conditions and data gathered about the two inactive uranium mill tailings sites near Rifle, Colorado, and the designated disposal site six miles north of Rifle in the area of Estes Gulch. It consolidates available engineering, radiological, geotechnical, hydrological, meteorological, and other information pertinent to the design of the Remedial Action Plan (RAP). The data characterize conditions at the mill, tailings, and disposal site so that the Remedial Action Contractor (RAC) may complete final designs for the remedial actions.

  12. Comment and response document for the final remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Slick Rock, Colorado. Revision 2

    International Nuclear Information System (INIS)

    1996-05-01

    This document for the final remedial action plan and site design has been prepared for US Department of Energy Environmental Restoration Division as part of the Uranium Mill Tailings Remedial Action plan. Comments and responses are included for the site design for stabilization of the inactive uranium mill tailings sites at Slick Rock, Colorado

  13. Summary report of Hanford Site well remediation and decommissioning activities for fiscal year 1994

    International Nuclear Information System (INIS)

    Reynolds, K.D.

    1994-01-01

    Remediation and decommissioning of Hanford Site wells has become an integral part of Hanford Site Environmental Restoration (ER) and Resource Conservation and Recovery Act of 1976 (RCRA) groundwater monitoring programs. A well remediation and decommissioning program was funded and implemented in fiscal year (FY) 1993 under the RCRA and Operational Monitoring (ROM) Program. Funding for this work increased in FY 1994. In FY 1994 well decommissioning activities conducted for the ROM program were centered around the 200 West Area; activities for the ER program were centered in the Fitzner/Eberhart Arid Land Ecology (ALE) (Reserve) unit and the Wahluke Slope (North Slope) area. A total of 116 wells and test borings were decommissioned between the two programs during FY 1994. Additionally, five wells were identified as in need of remediation and were successfully brought into compliance with regulatory requirements. As Hanford Site restoration and remediation efforts increase in scope, the well decommissioning program will remain dynamic. The program will aggressively seek to fulfill the needs of the various environmental cleanup and groundwater/vadose monitoring programs. Wells that do not meet regulatory requirements for preservation will continually be identified and remediated or decommissioned accordingly

  14. Flow sheet development for the remediation of tank SY-102 at the Hanford Nuclear Reservation

    International Nuclear Information System (INIS)

    Yarbro, S.L.; Punjak, W.A.; Schreiber, S.B.; Ortiz, E.M.; Jarvinen, G.D.

    1994-01-01

    The U.S. Department of Energy established the Tank Waste Remediation System (TWRS) to safely manage and dispose of radioactive waste stored in underground tanks at the Hanford Nuclear Reservation. A major task of TWRS is to separate tank wastes into high-level and low-level fractions. This separation is important because of the enormous costs associated with handling high-level waste and the limited repository space that is available. Due to their high activity, segregating the actinides and fission products from the bulk of the waste is required to achieve this goal. As a part of this program, personnel at the Los Alamos National Laboratory have developed and demonstrated a flow sheet to remediate tank SY-102 at the Hanford Site. This presentation documents the results of the flow sheet demonstrations performed with simulated, but radioactive, wastes using an existing glovebox line at the Los Alamos Plutonium Facility. Removal of the actinides from a high-salt, low-acid feed by ion exchange is the key unit operation. The flow sheet produces relatively low waste volumes, can be accomplished with conventional chemical processing equipment, and takes advantage of the components of the waste to increase the efficiency of the TRU elements recovery

  15. Robust remediation strategies at gas-work sites: a case of source recognition and source characterization

    International Nuclear Information System (INIS)

    Vries, P.O. de

    2005-01-01

    In The Netherlands there have been gasworks at about 260 to 270 locations. Most of these locations are or were heavily polluted with tar, ashes and cyanides and many of them belong to the locations where remediation actions have already been executed. It seems however that many of them also belong to the locations where remediation actions were not quite as successful as was expected. So, for many gas-work sites that were already 'remedied' in the 80's and early 90's of the foregoing century, new programs for site remediation are planned. Of course the mistakes from the past should now be avoided. The current remediation strategy in The Netherlands for gas-work sites can be comprised in four steps: 1 - removing spots in the top soil, 2 - removing spots with mobile components in the shallow subsoil, 3 - controlling spots with mobile components in the deep subsoil, 4 - creating a 'steady endpoint situation' in the plume. At many former gas-work sites real sources, i.e. in a physico-chemical sense, are not very well known. This can easily lead to insufficient removal of some or part of these sources and cause a longer delivery of contaminants to the groundwater plume, with higher endpoint concentrations, higher costs and more restrictions for future use. The higher concentrations and longer deliveries originating from not recognized or not localized sources are often not sufficiently compensated by the proposed plume management in current remediation strategies. Remediation results can be improved by using knowledge about the processes that determine the delivery of contaminants to the groundwater, the materials that cause these delivery and the locations at the site where these are most likely found. When sources are present in the deep subsoil or the exact localization of sources is uncertain, robust remediation strategies should be chosen and wishful thinking about removing sources with in situ techniques should be avoided. Robust strategies are probably less

  16. Radiological audit of remedial action activities at the processing site, transfer site, and Cheney disposal site Grand Junction, Colorado: Audit date, August 9--11, 1993

    International Nuclear Information System (INIS)

    1993-08-01

    The Uranium Mill Tailing Remedial Action (UMTRA) Project's Technical Assistance Contractor (TAC) performed a radiological audit of the Remedial Action Contractor (RAC), MK-Ferguson and CWM Federal Environmental Services, Inc., at the processing site, transfer site, and Cheney disposal site in Grand Junction, Colorado. Jim Hylko and Bill James of the TAC conducted this audit August 9 through 11, 1993. Bob Cornish and Frank Bosiljevec represented the US Department of Energy (DOE). This report presents one programmatic finding, eleven site-specific observations, one good practice, and four programmatic observations

  17. Bridge Approach Remedies Implemented at Western Mega Site

    Science.gov (United States)

    2017-09-01

    As part of the heavy axle load (HAL) revenue service mega site testing program, the Transportation Technology Center, Inc. (TTCI) has worked closely with the Union Pacific Railroad (UP) to address bridge approach problems under HAL operations. The te...

  18. Remediation System Evaluation, Savage Municipal Water Supply Superfund Site (PDF)

    Science.gov (United States)

    The Savage Municipal Water Supply Superfund Site, located on the western edge of Milford, New Hampshire, consists of a source area and an extended plume that is approximately 6,000 feet long and 2,500 feet wide.

  19. Review: Waste-Pretreatment Technologies for Remediation of Legacy Defense Nuclear Wastes

    Energy Technology Data Exchange (ETDEWEB)

    Wilmarth, William R.; Lumetta, Gregg J.; Johnson, Michael E.; Poirier, Micheal R.; Thompson, Major C.; Suggs, Patricia C.; Machara, N.

    2011-01-13

    The U.S. Department of Energy (DOE) is responsible for retrieving, immobilizing, and disposing of radioactive waste that has been generated during the production of nuclear weapons in the United States. The vast bulk of this waste material is stored in underground tanks at the Savannah River Site in South Carolina and the Hanford Site in Washington State. The general strategy for treating the radioactive tank waste consists of first separating the waste into high-level and low-activity fractions. This initial partitioning of the waste is referred to as pretreatment. Following pretreatment, the high-level fraction will be immobilized in a glass form suitable for disposal in a geologic repository. The low-activity waste will be immobilized in a waste form suitable for disposal at the respective site. This paper provides a review of recent developments in the application of pretreatment technologies to the processing of the Hanford and Savannah River radioactive tank wastes. Included in the review are discussions of 1) solid/liquid separations methods, 2) cesium separation technologies, and 3) other separations critical to the success of the DOE tank waste remediation effort. Also included is a brief discussion of the different requirements and circumstances at the two DOE sites that have in some cases led to different choices in pretreatment technologies.

  20. Radiological guidelines for application to DOE's Formerly Utilized Sites Remedial Action Program

    International Nuclear Information System (INIS)

    1983-03-01

    The US Department of Energy has implemented a program to evaluate and, where necessary, take action to protect the public from contamination at sites that were used in the past to process and/or store radioactive materials for the former US Army Corps of Engineers Manhattan Engineer District or the US Atomic Energy Commission. The program is identified as the Formerly Utilized Sites Remedial Action Program (FUSRAP). This document describes methods considered appropriate for the evaluation of health effects that might possible be caused by radioactive contamination at FUSRAP sites. This assessment methodology is applied to a typical site for the purposeof deriving guidelines for the cleanup of contaminated soil. Additional guidance is provided for planning site-specific remedial action that is consistent with the overall objectives of FUSRAP

  1. A multidisciplinary approach to site remediation and management in a bedrock environment

    Energy Technology Data Exchange (ETDEWEB)

    Millard, G. [Shell Canada Ltd., Calgary, AB (Canada); Micklethwaite, R.; Digel, S.; Lyons, E. [O' Connor Associates Environmental Inc., Calgary, AB (Canada)

    2006-07-01

    A multidisciplinary approach to site remediation and management in a bedrock environment was presented. This presentation provided a description of the site which was a former service station from 1985 to 2003 in Calgary. Illustrations of the subject site and stratigraphic section were presented along with initial environmental conditions. The project objectives included: managing the site so that a tenant could re-develop and occupy the site; minimizing management costs until long-term, remediation could be achieved; and, developing and implementing a plan to assess, mitigate, and manage the risk in a manner accepted by Alberta Environment and the City of Calgary. The presentation also addressed issues regarding a risk-assessment, high vacuum extraction system, and refining HVE operations. The regulatory, business and ancillary outcomes of the risk assessment were also outlined. Last, the presentation identified how the results were achieved. tabs., figs.

  2. Proposed plan for remedial action at the chemical plant area of the Weldon Spring site

    International Nuclear Information System (INIS)

    1992-11-01

    This proposed plan addresses the management of contaminated material at the chemical plant area of the Weldon Spring site and nearby properties in St. Charles County, Missouri. The site consists of a chemical plant area and a noncontiguous limestone quarry, both of which are radioactively and chemically contaminated as a result of past processing and disposal activities. Explosives were produced at the chemical plant in the 1940s, and uranium and thorium materials were processed in the 1950s and 1960s. Various liquid, sludge, and solid wastes were disposed of at the Chemical plant area and in the quarry during that time. The Weldon Spring site is listed on the National Priorities List (NPL) of the US Environmental Protection Agency (EPA), and the US Department of Energy (DOE) is conducting cleanup activities at the site under its Environmental Restoration and Waste Management Program. The proposed plan is organized as follows: Chapter 2 presents the history and setting of the Weldon Spring site and briefly describes the contaminated material at the chemical plant area. Chapter 3 defines the scope of the remedial action and its role in the Weldon Spring Site Remedial Action Project. Chapter 4 summarizes the risks associated with possible exposures to site contaminants in the absence of remedial action and identifies proposed cleanup levels for soil. Chapter 5 briefly describes the final alternatives considered for the remedial action. Chapter 6 summarizes the evaluation of final alternatives for managing the contaminated material, identifies the currently preferred alternative, and discusses a possible contingency remedy to provide treatment flexibility. Chapter 7 presents the community's role in this action. Chapter 8 is a list of the references cited in this proposed plan

  3. Radiological surveillance of Remedial Action activities at the processing site, Falls City, Texas. Final report

    International Nuclear Information System (INIS)

    1993-04-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project's Technical Assistance Contractor (TAC) performed a radiological surveillance of the Remedial Action Contractor (RAC), MK-Ferguson and CWM Federal Environmental Services, Inc., at the processing site in Falls City, Texas. This surveillance was conducted March 22--26, 1993. No findings were identified during the surveillance. Three site-specific observations and three programmatic observations are presented in this report. The overall conclusion from the surveillance is that the radiological aspects of the Falls City, Texas, remedial action program are performed adequately. However, some of the observations identify that there is potential for improving certain aspects of the occupational radiological air sampling, ensuring analytical data quality, and in communicating with the DOE and TAC on the ore sampling methods. The TAC has also received and is currently reviewing the RAC's responses regarding the observations identified during the radiological surveillance performed October 29--30, 1992

  4. Environmental assessment for 881 Hillside (High Priority Sites) interim remedial action

    International Nuclear Information System (INIS)

    1990-01-01

    This Environmental Assessment evaluates the impact of an interim remedial action proposed for the High Priority Sites (881 Hillside Area) at the Rocky Flats Plant (RFP). This interim action is to be conducted to minimize the release of hazardous substances from the 881 Hillside Area that pose a potential long-term threat to public health and the environment. This document integrates current site characterization data and environmental analyses required by the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) or ''Superfund'' process, into an environmental assessment pursuant to the National Environmental Policy Act (NEPA). Characterization of the 881 Hillside Area is continuing. Consequently, a final remedial action has not yet been proposed. Environmental impacts associated with the proposed interim remedial action and reasonable alternatives designed to remove organic and inorganic contaminants, including radionuclides, from alluvial groundwater in the 881 Hillside Area are addressed. 24 refs., 5 figs., 23 tabs

  5. Environmental assessment of remedial action at the Slick Rock uranium mill tailings sites, Slick Rock, Colorado

    International Nuclear Information System (INIS)

    1995-01-01

    The Uranium Mill Tailings Radiation Control Act of 1978, hereafter referred to as the UMTRCA, authorized the US Department of Energy (DOE) to clean up two uranium mill tailings processing sites near Slick Rock, Colorado, in San Miguel County. The purpose of the cleanup is to reduce the potential health effects associated with the radioactive materials remaining on the processing sites and on vicinity properties (VPs) associated with the sites. The US Environmental Protection Agency (EPA) promulgated standards for the UMTRCA that contained measures to control the contaminated materials and to protect the ground water from further degradation. The sites contain concrete foundations of mill buildings, tailings piles, and areas contaminated by windblown and waterborne radioactive tailings materials. The proposed action is to remediate the UC and NC sites by removing all contaminated materials within the designated site boundaries or otherwise associated with the sites, and relocating them to, and stabilizing them at, a location approximately 5 road mi (8 km) northeast of the processing sites on land administered by the US Bureau of Land Management (BLM). Remediation would be performed by the DOE's Uranium Mill Tailings Remedial Action (UMTRA) Project

  6. Environmental assessment of remedial action at the Slick Rock uranium mill tailings sites, Slick Rock, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-01-01

    The Uranium Mill Tailings Radiation Control Act of 1978, hereafter referred to as the UMTRCA, authorized the US Department of Energy (DOE) to clean up two uranium mill tailings processing sites near Slick Rock, Colorado, in San Miguel County. The purpose of the cleanup is to reduce the potential health effects associated with the radioactive materials remaining on the processing sites and on vicinity properties (VPs) associated with the sites. The US Environmental Protection Agency (EPA) promulgated standards for the UMTRCA that contained measures to control the contaminated materials and to protect the ground water from further degradation. The sites contain concrete foundations of mill buildings, tailings piles, and areas contaminated by windblown and waterborne radioactive tailings materials. The proposed action is to remediate the UC and NC sites by removing all contaminated materials within the designated site boundaries or otherwise associated with the sites, and relocating them to, and stabilizing them at, a location approximately 5 road mi (8 km) northeast of the processing sites on land administered by the US Bureau of Land Management (BLM). Remediation would be performed by the DOE`s Uranium Mill Tailings Remedial Action (UMTRA) Project.

  7. Remedial actions at the former Union Carbide Corporation uranium mill sites, Rifle, Garfield County, Colorado: Final environmental impact statement

    International Nuclear Information System (INIS)

    1990-03-01

    This appendix provides the information needed to understand the conceptual designs for the remedial action alternatives addressed in this environmental impact statement (EIS). It is intended to provide sufficient details for the reader to evaluate the feasibility and assess the impacts of each remedial action alternative. It is not intended to provide the detailed engineering necessary to implement the alternatives. Details of the preferred remedial action will be presented in the remedial action plan (RAP). The remedial action alternatives addressed in this EIS include no action, stabilization at the New Rifle site, disposal at the Estes Gulch site, and disposal at the Lucas Mesa site. All alternatives include interim actions to remediate existing health and safety hazards to the Rifle community that presently exist at the Old and New Rifle processing sites. 21 figs., 18 tabs

  8. Screening of Potential Remediation Methods for the 200-ZP-1 Operable Unit at the Hanford Site

    Energy Technology Data Exchange (ETDEWEB)

    Truex, Michael J.; Nimmons, Michael J.; Johnson, Christian D.; Dresel, P EVAN.; Murray, Christopher J.

    2006-08-07

    A screening-level evaluation of potential remediation methods for application to the contaminants of concern (COC) in the 200-ZP-1 Operable Unit at the Hanford Site was conducted based on the methods outlined in the Guidance for Conducting Remedial Investigations and Feasibility Studies under CERCLA Interim Final. The scope of this screening was to identify the most promising remediation methods for use in the more detailed analysis of remediation alternatives that will be conducted as part of the full feasibility study. The screening evaluation was conducted for the primary COC (potential major risk drivers). COC with similar properties were grouped for the screening evaluation. The screening evaluation was conducted in two primary steps. The initial screening step evaluated potential remediation methods based on whether they can be effectively applied within the environmental setting of the 200-ZP-1 Operable Unit for the specified contaminants. In the second step, potential remediation methods were screened using scoping calculations to estimate the scale of infrastructure, overall quantities of reagents, and conceptual approach for applying the method for each defined grouping of COC. Based on these estimates, each method was screened with respect to effectiveness, implementability, and relative cost categories of the CERCLA feasibility study screening process defined in EPA guidance.

  9. Remediating while preserving wetland habitat at an LLR waste site in Canada

    International Nuclear Information System (INIS)

    Kleb, H.R.; Zelmer, R.L.

    2007-01-01

    The Low-Level Radioactive Waste Management Office was established in 1982 to carry out the federal government's responsibilities for low-level radioactive (LLR) waste management in Canada. The Office operates programs to characterize, delineate, decontaminate and consolidate historic LLR waste for interim and long-term storage. In this capacity, the Office is currently considering the remediation of 9,000 cubic metres of contaminated sediment in a coastal marsh in the context of a major remediation project involving multiple urban sites. The marsh is situated between the Lake Ontario shoreline and the urban fringe of the Town of Port Hope. The marsh is designated a Cattail Mineral Shallow Marsh under the Ecological Land Classification system for Southern Ontario and was recently named the A.K. Sculthorpe Marsh in memory of a local community member. The marsh remediation will therefore require trade off between the disruption of a sensitive wetland and the removal of contaminated sediment. This paper discusses the issues and trade-off relating to the waste characterization, environmental assessment and regulatory findings and thus the remediation objectives for the marsh. Considerations include the spatial distribution of contaminated sediment, the bioavailability of contaminants, the current condition of the wetland and the predicted effects of remediation. Also considered is the significance of the wetland from provincial and municipal regulatory perspectives and the resulting directives for marsh remediation. (authors)

  10. On site remediation of a fuel spill and soil reuse in Antarctica.

    Science.gov (United States)

    McWatters, R S; Wilkins, D; Spedding, T; Hince, G; Raymond, B; Lagerewskij, G; Terry, D; Wise, L; Snape, I

    2016-11-15

    The first large-scale remediation of fuel contamination in Antarctica treated 10000L of diesel dispersed in 1700t of soil, and demonstrated the efficacy of on-site bioremediation. The project progressed through initial site assessment and natural attenuation, passive groundwater management, then active remediation and the managed reuse of soil. Monitoring natural attenuation for the first 12years showed contaminant levels in surface soil remained elevated, averaging 5000mg/kg. By contrast, in five years of active remediation (excavation and biopile treatment) contaminant levels decreased by a factor of four. Chemical indicators showed hydrocarbon loss was apportioned to both biodegradation and evaporative processes. Hydrocarbon degradation rates were assessed against biopile soil temperatures, showing a phase of rapid degradation (first 100days above soil temperature threshold of 0°C) followed by slower degradation (beyond 100days above threshold). The biopiles operated successfully within constraints typical of harsh climates and remote sites, including limitations on resources, no external energy inputs and short field seasons. Non-native microorganisms (e.g. inoculations) and other organic materials (e.g. bulking agents) are prohibited in Antarctica making this cold region more challenging for remediation than the Arctic. Biopile operations included an initial fertiliser application, biannual mechanical turning of the soil and minimal leachate recirculation. The biopiles are a practical approach to remediate large quantities of contaminated soil in the Antarctic and already 370t have been reused in a building foundation. The findings presented demonstrate that bioremediation is a viable strategy for Antarctica and other cold regions. Operators can potentially use the modelled relationship between days above 0°C (threshold temperature) and the change in degradation rates to estimate how long it would take to remediate other sites using the biopile technology

  11. WSSRAP chemical plant geotechnical investigations for the Weldon Spring Site Remedial Action Project, Weldon Spring, Missouri

    International Nuclear Information System (INIS)

    1990-12-01

    This document has been prepared for the United states Department of Energy (DOE) Weldon Spring Site Remedial Action Project (WSSRAP) by the Project Management Contractor (PMC), which consists of MK-Ferguson Company (MKF) and Morrison Knudsen Corporation Environmental Services Group (MKES) with Jacobs Engineering Group (JEG) as MKF's predesignated subcontractor. This report presents the results of site geotechnical investigations conducted by the PMC in the vicinity of the Weldon Spring chemical plant and raffinate pits (WSCP/RP) and in potential on-site and off-site clayey material borrow sources. The WSCP/RP is the proposed disposal cell (DC) site. 39 refs., 24 figs., 12 tabs

  12. Hydrogeological site investigation for the efficient remediation of uranium mining sites -- an integrated approach

    International Nuclear Information System (INIS)

    Biehler, D.; Jaquet, O.; Croise, J.; Lavanchy, J.-M.

    2002-01-01

    The currently practised remediation of former uranium mines in Eastern Germany involves the flooding of underground and open pit mines, and the stabilization of waste rock dumps and tailings ponds, e.g. by dewatering, covering, improving dams, cleaning effluents. This article presents examples demonstrating that the remediation concepts developed and implemented have failed their targets, resulting in uncontrolled flow behaviour and migration of contaminated water, leading to increased costs and additional threats to the environment. A generic series of steps for an improved remediation management with respect to financial efforts and environmental safety are proposed in terms of an integrated approach. (author)

  13. Environmental assessment of remedial action at the slick rock Uranium Mill Tailings sites Slick Rock, Colorado

    International Nuclear Information System (INIS)

    1994-09-01

    The Uranium Mill Tailings Radiation Control Act of 1978 (42 USC section 7901 et seq.), hereafter referred to as the UMTRCA, authorized the U.S. Department of Energy (DOE) to clean up two uranium mill tailings processing sites near Slick Rock, Colorado, in San Miguel County. The purpose of the cleanup is to reduce the potential health effects associated with the radioactive materials remaining on the sites and on vicinity properties (VPs) associated with the sites. Contaminated materials cover an estimated 55 acres of the Union Carbide (UC) processing site and 12 ac of the North Continent (NC) processing site. The total estimated volume of contaminated materials is approximately 61 8,300 cubic yards. In addition to the contamination in the two processing site areas, four VPs were found to contain contamination. As a result of the tailings being exposed to the environment, contamination associated with the UC and NC sites has leached into shallow ground water. Surface water has not been affected. The closest residence is approximately 0.3 air mi from either site. The proposed action is to remediate the UC and NC sites by removing all contaminated materials within the designated site boundaries or otherwise associated with the sites, and relocating them to, and stabilizing them at, a location approximately 5 road mi (8 km) northeast of the sites on land administered by the Bureau of Land Management (BLM). Remediation would be performed by the DOE's Uranium Mill Tailings Remedial Action (UMTRA) Project. All solid contaminated materials would be buried under 5 feet (ft) of rock and soil materials. The proposed disposal site area is currently used by ranchers for cattle grazing over a 7-month period. The closest residence to the proposed disposal site is 2 air mi. An estimated 44 ac of land would be permanently transferred from the BLM to the DOE and restricted from future use

  14. Environmental assessment of remedial action at the slick rock Uranium Mill Tailings sites Slick Rock, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    The Uranium Mill Tailings Radiation Control Act of 1978 (42 USC {section} 7901 et seq.), hereafter referred to as the UMTRCA, authorized the U.S. Department of Energy (DOE) to clean up two uranium mill tailings processing sites near Slick Rock, Colorado, in San Miguel County. The purpose of the cleanup is to reduce the potential health effects associated with the radioactive materials remaining on the sites and on vicinity properties (VPs) associated with the sites. Contaminated materials cover an estimated 55 acres of the Union Carbide (UC) processing site and 12 ac of the North Continent (NC) processing site. The total estimated volume of contaminated materials is approximately 61 8,300 cubic yards. In addition to the contamination in the two processing site areas, four VPs were found to contain contamination. As a result of the tailings being exposed to the environment, contamination associated with the UC and NC sites has leached into shallow ground water. Surface water has not been affected. The closest residence is approximately 0.3 air mi from either site. The proposed action is to remediate the UC and NC sites by removing all contaminated materials within the designated site boundaries or otherwise associated with the sites, and relocating them to, and stabilizing them at, a location approximately 5 road mi (8 km) northeast of the sites on land administered by the Bureau of Land Management (BLM). Remediation would be performed by the DOE`s Uranium Mill Tailings Remedial Action (UMTRA) Project. All solid contaminated materials would be buried under 5 feet (ft) of rock and soil materials. The proposed disposal site area is currently used by ranchers for cattle grazing over a 7-month period. The closest residence to the proposed disposal site is 2 air mi. An estimated 44 ac of land would be permanently transferred from the BLM to the DOE and restricted from future use.

  15. GROUDWATER REMEDIATION AT THE 100-HR-3 OPERABLE UNIT HANFORD, SITE WASHINGTON, USA - 11507

    International Nuclear Information System (INIS)

    Smoot, J.L.; Biebesheimer, F.H.; Eluskie, J.A.; Spiliotopoulos, A.; Tonkin, M.J.; Simpkin, T.

    2011-01-01

    The 100-HR-3 Groundwater Operable Unit (OU) at the Hanford Site underlies three former plutonium production reactors and the associated infrastructure at the 100-D and 100-H Areas. The primary contaminant of concern at the site is hexavalent chromium; the secondary contaminants are strontium-90, technetium-99, tritium, uranium, and nitrate. The hexavalent chromium plume is the largest plume of its type in the state of Washington, covering an area of approximately 7 km 2 (2.7 mi 2 ) with concentrations greater than 20 (micro)g/L. Concentrations range from 60,000 (micro)g/L near the former dichromate transfer station in the 100-D Area to large areas of 20 to 100 (micro)g/L across much of the plume area. Pump-and-treat operations began in 1997 and continued into 2010 at a limited scale of approximately 200 gal/min. Remediation of groundwater has been fairly successful in reaching remedial action objectives (RAOs) of 20 (micro)g/L over a limited region at the 100-H, but less effective at 100-D. In 2000, an in situ, permeable reactive barrier was installed downgradient of the hotspot in 100-D as a second remedy. The RAOs are still being exceeded over a large portion of the area. The CH2M HILL Plateau Remediation Company was awarded the remediation contract for groundwater in 2008 and initiated a remedial process optimization study consisting of modeling and technical studies intended to enhance the remediation. As a result of the study, 1,400 gal/min of expanded treatment capacity are being implemented. These new systems are designed to meet 2012 and 2020 target milestones for protection of the Columbia River and cleanup of the groundwater plumes.

  16. Alternative Endpoints and Approaches for the Remediation of Contaminated Groundwater at Complex Sites - 13426

    Energy Technology Data Exchange (ETDEWEB)

    Deeb, Rula A.; Hawley, Elisabeth L. [ARCADIS, U.S., 2000 Powell St., 7th Floor, Emeryville, California 94608 (United States)

    2013-07-01

    The goal of United States (U.S.) Department of Energy's (DOE)'s environmental remediation programs is to restore groundwater to beneficial use, similar to many other Federal and state environmental cleanup programs. Based on past experience, groundwater remediation to pre-contamination conditions (i.e., drinking water standards or non-detectable concentrations) can be successfully achieved at many sites. At a subset of the most complex sites, however, complete restoration is not likely achievable within the next 50 to 100 years using today's technology. This presentation describes several approaches used at complex sites in the face of these technical challenges. Many complex sites adopted a long-term management approach, whereby contamination was contained within a specified area using active or passive remediation techniques. Consistent with the requirements of their respective environmental cleanup programs, several complex sites selected land use restrictions and used risk management approaches to accordingly adopt alternative cleanup goals (alternative endpoints). Several sites used long-term management designations and approaches in conjunction with the alternative endpoints. Examples include various state designations for groundwater management zones, technical impracticability (TI) waivers or greater risk waivers at Superfund sites, and the use of Monitored Natural Attenuation (MNA) or other passive long-term management approaches over long time frames. This presentation will focus on findings, statistics, and case studies from a recently-completed report for the Department of Defense's Environmental Security Technology Certification Program (ESTCP) (Project ER-0832) on alternative endpoints and approaches for groundwater remediation at complex sites under a variety of Federal and state cleanup programs. The primary objective of the project was to provide environmental managers and regulators with tools, metrics, and information needed

  17. Alternative Endpoints and Approaches for the Remediation of Contaminated Groundwater at Complex Sites - 13426

    International Nuclear Information System (INIS)

    Deeb, Rula A.; Hawley, Elisabeth L.

    2013-01-01

    The goal of United States (U.S.) Department of Energy's (DOE)'s environmental remediation programs is to restore groundwater to beneficial use, similar to many other Federal and state environmental cleanup programs. Based on past experience, groundwater remediation to pre-contamination conditions (i.e., drinking water standards or non-detectable concentrations) can be successfully achieved at many sites. At a subset of the most complex sites, however, complete restoration is not likely achievable within the next 50 to 100 years using today's technology. This presentation describes several approaches used at complex sites in the face of these technical challenges. Many complex sites adopted a long-term management approach, whereby contamination was contained within a specified area using active or passive remediation techniques. Consistent with the requirements of their respective environmental cleanup programs, several complex sites selected land use restrictions and used risk management approaches to accordingly adopt alternative cleanup goals (alternative endpoints). Several sites used long-term management designations and approaches in conjunction with the alternative endpoints. Examples include various state designations for groundwater management zones, technical impracticability (TI) waivers or greater risk waivers at Superfund sites, and the use of Monitored Natural Attenuation (MNA) or other passive long-term management approaches over long time frames. This presentation will focus on findings, statistics, and case studies from a recently-completed report for the Department of Defense's Environmental Security Technology Certification Program (ESTCP) (Project ER-0832) on alternative endpoints and approaches for groundwater remediation at complex sites under a variety of Federal and state cleanup programs. The primary objective of the project was to provide environmental managers and regulators with tools, metrics, and information needed to evaluate

  18. 76 FR 42074 - Consideration of Rulemaking To Address Prompt Remediation of Residual Radioactivity During...

    Science.gov (United States)

    2011-07-18

    ... Address Prompt Remediation of Residual Radioactivity During Operations AGENCY: Nuclear Regulatory... radioactivity during the operational phase of licensed material sites and nuclear reactors. The NRC has not... to the decommissioning planning process by addressing remediation of residual radioactivity during...

  19. Multi-criteria assessment tool for sustainability appraisal of remediation alternatives for a contaminated site

    DEFF Research Database (Denmark)

    Søndergaard, Gitte Lemming; Binning, Philip John; Bondgård, Morten

    2017-01-01

    Purpose: In order to improve and support decision-making for the selection of remedial techniques for contaminated sites, a multi-criteria assessment (MCA) method has been developed. The MCA framework is structured in a decision process actively involving stakeholders, and compares...

  20. Tank Waste Remediation System, Hanford Site, Richland, Washington. Final Environmental Impact Statement. Volume IV

    International Nuclear Information System (INIS)

    1996-08-01

    This document, Volume 4, describes the current safety concerns associated with the tank waste and analyzes the potential accidents and associated potential health effects that could occur under the alternatives included in this Tank Waste Remediation System (TWRS) Final Environmental Impact Statement (EIS) for the Hanford Site, Richland, Washington

  1. UNITED STATES AND GERMAN BILATERAL AGREEMENT ON REMEDIATION OF HAZARDOUS WASTE SITES

    Science.gov (United States)

    The U.S. Environmental Protection Agency (EPA) and Germany's Bundesministerium fur Forschung und Technologie (BMFT) are involved in a collaborative effort called the U.S. and German Bilateral Agreement on Remediation of Hazardous Waste Sites. he purpose of this interim status rep...

  2. 75 FR 71677 - Reimbursement for Costs of Remedial Action at Active Uranium and Thorium Processing Sites

    Science.gov (United States)

    2010-11-24

    ... DEPARTMENT OF ENERGY Reimbursement for Costs of Remedial Action at Active Uranium and Thorium... in FY 2011 from eligible active uranium and thorium processing site licensees for reimbursement under... approximately $24.3 million of Recovery Act funds available for reimbursement in FY 2011, as well as the $10...

  3. Site evaluation for nuclear installations. Safety requirements

    International Nuclear Information System (INIS)

    2003-01-01

    This Safety Requirements publication supersedes the Code on the Safety of Nuclear Power Plants: Siting, which was issued in 1988 as Safety Series No. 50-C-S (Rev. 1). It takes account of developments relating to site evaluations for nuclear installations since the Code on Siting was last revised. These developments include the issuing of the Safety Fundamentals publication on The Safety of Nuclear Installations, and the revision of various safety standards and other publications relating to safety. Requirements for site evaluation are intended to ensure adequate protection of site personnel, the public and the environment from the effects of ionizing radiation arising from nuclear installations. It is recognized that there are steady advances in technology and scientific knowledge, in nuclear safety and in what is considered adequate protection. Safety requirements change with these advances and this publication reflects the present consensus among States. This Safety Requirements publication was prepared under the IAEA programme on safety standards for nuclear installations. It establishes requirements and provides criteria for ensuring safety in site evaluation for nuclear installations. The Safety Guides on site evaluation listed in the references provide recommendations on how to meet the requirements established in this Safety Requirements publication. The objective of this publication is to establish the requirements for the elements of a site evaluation for a nuclear installation so as to characterize fully the site specific conditions pertinent to the safety of a nuclear installation. The purpose is to establish requirements for criteria, to be applied as appropriate to site and site-installation interaction in operational states and accident conditions, including those that could lead to emergency measures for: (a) Defining the extent of information on a proposed site to be presented by the applicant; (b) Evaluating a proposed site to ensure that the site

  4. Remediation options and treatment for Tebuthiuron at an upstream oil and gas site

    Energy Technology Data Exchange (ETDEWEB)

    Lin, F. [EBA Engineering Consultants Ltd., Edmonton, AB (Canada)

    2009-07-01

    Sterilants are strong herbicides that contain teburithion, a substance of concern in remediation and reclamation activities. Tebuthiuron has very high to low mobility in soils, and its sorption capacity increases in relation to clay and organic matter content. There is currently no soil benchmark for sterilants. Remedial options for tebuthiuron include adsorption with amendments, thermal desorption, and soil flushing with injected solutions. A recent pilot plant successfully used thermal desorption to treat soil contaminated with tebuthiuron and bromacil to below laboratory detection limits. Surface soils at the site were contaminated to a depth of 4 m. A temperature ramping study was performed to determine optimal treatment temperatures. A total of 15,136 tonnes of soil were treated and then used as backfill on-site. Water at the site was monitored and treated with charcoal filters. Hydrocarbon-contaminated soil at the site was also successfully treated using the thermal desorption process. tabs., figs.

  5. Remedial design services for Montclair/West Orange and Glen Ridge Superfund sites

    International Nuclear Information System (INIS)

    Urbaniak, T.F.; Tomiczek, P.W. Jr.

    1994-01-01

    The Montclair/West Orange and Glen Ridge Superfund Sites are located 12 miles west of New York City in Essex County, New Jersey. The sites are contaminated with waste materials from radium-processing facilities which operated in the area during the early 1900's. The waste materials, containing radium and other radioactive isotopes were placed in three separate landfill sites. Major public health risks are indoor radon gas build-up and indoor/ outdoor gamma radiation. In 1989, the EPA issued a Record of Decision (ROD) which chose excavation and off-site disposal of material as the preferred alternative. The purpose of this presentation is to highlight key elements of the design process for the remedial action at Montclair. Those key elements are as follows: meeting community relations challenges; measuring radioactive contamination; developing plans and specifications; packaging of remedial action contacts; and continually improving both the process and the designs

  6. Remedial investigation for the 200-BP-1 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    Buckmaster, M.A.

    1991-01-01

    The Hanford Site, Richland, Washington, contains over 1500 identified waste sites that will be characterized and remediated over the next 30 years. In support of the ''Hanford Federal Facility Agreement and Consent Order,'' the US Department of Energy has initiated a remedial investigation/feasibility study (RI/FS) at the 200-BP-1 operable unit. The 200-BP-1 RI is the first Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) investigation on the Hanford Site that involves drilling into highly radioactive and chemically contaminated soils. The initial phase of the site characterization is oriented toward determining the nature and extent of any contamination present in the vicinity of the 200-BP-1 operable unit. The major focus of the Phase I RI is the drilling and sampling of 10 inactive waste disposal units which received low level radioactive liquid waste

  7. Environmental compliance assessment findings for Weldon Spring Site Remedial Action Program

    International Nuclear Information System (INIS)

    Sigmon, C.F.; Levine, M.B.

    1990-01-01

    This report presents the results of an environmental assessment conducted at Weldon Spring Site Remedial Action Project (WSSRAP) in St. Charles County, Missouri, in accordance with the Formerly Utilized Sites Remedial Action Program (FUSRAP) Environmental Compliance Assessment Checklists. The purpose of this assessment was to evaluate the compliance of the site with applicable federal and Missouri environment regulations. Assessments activities included the following: review of site records, reports ,and files; inspection of the WSSRAP storage building, other selected buildings, and the adjacent grounds; and interviews with project personnel. This assessment was conducted on August 28-30, 1989. The assessment covered five management areas as set forth in the Checklist: Hazardous Waste Management, Polychlorinated Biphenyls (PCBs) Management; Air Emissions; Wastewater Discharges and Petroleum Management. No samples were collected. 1 ref., 2 figs., 1 tab

  8. Assessing Alternative Endpoints for Groundwater Remediation at Contaminated Sites

    Science.gov (United States)

    2011-05-01

    Soil – Land disposal restrictions for chemicals New Bedford 1 ROD 9/25/98 Surface water and seafood – Clean Water Act and Food, Drug and Cosmetic ...DNAPL longevity through biological flux enhancement. Prepared for Environmental Security Technology Certification Program by Rice University...NJDEP and EPA began site investigation after black tar-like material is found in soil near a sewer pipe 1998 Removal activities, mulch and

  9. Development of a sitewide groundwater remediation strategy at the Hanford Site, Washington

    International Nuclear Information System (INIS)

    Goswami, D.

    1996-01-01

    Over 440 km 2 (170 mi 2 ) of groundwater beneath the Hanford Site are contaminated by hazardous and radioactive waste, out of which almost half is over state and federal drinking water standards. In addition to the complicated nature of these plumes, remediation is further obscured by limited application of available technologies and hydrogeologic information. This paper briefly describes the processes used by the Washington State Department of Ecology (Ecology), U.S. Environmental Protection Agency, and U.S. Department of Energy (USDOE) in developing a sitewide groundwater remediation strategy for Hanford and its outcome. As an initial approach to sitewide groundwater remediation, the strategy is to remediate the major plumes found in the reactor areas (100 Area) adjacent to the Columbia River and contain the major plumes found in the Central Plateau region (200 Area). This approach was based mainly on the qualitative risk, stakeholder's and tribe's values, and available technical feasibility. The strategy emphasizes the use of existing treatment and extraction technology for the remediation of groundwater in combination with proposed and existing site infrastructure. This work is being performed in parallel with ongoing risk and other feasibility activities. Under this strategy, innovative technologies being developed are in the areas of dense nonaqueous phase liquid identification and recovery, and problems associated with strontium-90, cesium-137, and plutonium in the vadose zone and groundwater. The final remediation strategy alternatives remain a product of risk assessment, technical feasibility, site use scenario, and cost consideration. In order to develop a strategy for the final cleanup, several issues such as aquifer restoration, natural attenuation, potential contamination of groundwater from the tank farms and from the existing contamination source in the vadose zone must be looked in detail in conjuction with public and stakeholder's values

  10. Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Site, Maybell, Colorado. Remedial action selection report: Attachment 2, Geology report, Final

    International Nuclear Information System (INIS)

    1994-06-01

    The Maybell uranium mill tailings site is 25 miles (mi) (40 kilometers [km]) west of the town of Craig, Colorado, in Moffat County, in the northwestern part of the state. The unincorporated town of Maybell is 5 road mi (8 km) southwest of the site. The designated site covers approximately 110 acres (ac) (45 hectares [ha]) and consists of a concave-shaped tailings pile and rubble from the demolition of the mill buildings buried in the former mill area. Contaminated materials at the Maybell processing site include the tailings pile, which has an average depth of 20 feet (ft) (6 meters [m]) and contains 2.8 million cubic yards (yd 3 ) (2.1 million cubic meters [m 3 ]) of tailings. The former mill processing area is on the north side of the site and contains 20,000 yd 3 (15,000 m 3 ) of contaminated demolition debris. Off-pile contamination is present and includes areas adjacent to the tailings pile, as well as contamination dispersed by wind and surface water flow. The volume of off-pile contamination to be placed in the disposal cell is 550,000 yd 3 (420,000 m 3 ). The total volume of contaminated materials to be disposed of as part of the remedial action is estimated to be 3.37 million yd 3 (2.58 million m 3 ). Information presented in this Final Remedial Action Plan (RAP) and referenced in supporting documents represents the current disposal cell design features and ground water compliance strategy proposed by the US Department of Energy (DOE) for the Maybell, Colorado, tailings site. Both the disposal cell design and the ground water compliance strategy have changed from those proposed prior to the preliminary final RAP document as a result of prudent site-specific technical evaluations

  11. Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Site, Maybell, Colorado. Remedial action selection report: Attachment 2, Geology report, Final

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    The Maybell uranium mill tailings site is 25 miles (mi) (40 kilometers [km]) west of the town of Craig, Colorado, in Moffat County, in the northwestern part of the state. The unincorporated town of Maybell is 5 road mi (8 km) southwest of the site. The designated site covers approximately 110 acres (ac) (45 hectares [ha]) and consists of a concave-shaped tailings pile and rubble from the demolition of the mill buildings buried in the former mill area. Contaminated materials at the Maybell processing site include the tailings pile, which has an average depth of 20 feet (ft) (6 meters [m]) and contains 2.8 million cubic yards (yd{sup 3}) (2.1 million cubic meters [m{sup 3}]) of tailings. The former mill processing area is on the north side of the site and contains 20,000 yd{sup 3} (15,000 m{sup 3}) of contaminated demolition debris. Off-pile contamination is present and includes areas adjacent to the tailings pile, as well as contamination dispersed by wind and surface water flow. The volume of off-pile contamination to be placed in the disposal cell is 550,000 yd{sup 3} (420,000 m{sup 3}). The total volume of contaminated materials to be disposed of as part of the remedial action is estimated to be 3.37 million yd{sup 3} (2.58 million m{sup 3}). Information presented in this Final Remedial Action Plan (RAP) and referenced in supporting documents represents the current disposal cell design features and ground water compliance strategy proposed by the US Department of Energy (DOE) for the Maybell, Colorado, tailings site. Both the disposal cell design and the ground water compliance strategy have changed from those proposed prior to the preliminary final RAP document as a result of prudent site-specific technical evaluations.

  12. Biological assessment for the remedial action at the chemical plant area of the Weldon Spring site

    Energy Technology Data Exchange (ETDEWEB)

    Hlohowskyj, I.; Dunn, C.P.

    1992-11-01

    The Weldon Spring site in St.Charles County, Missouri, became contaminated during the 1940s through the 1960s as a result of explosives production by the US Army and uranium and thorium processing by the predecessor agency of the US Department of Energy (DOE). The site is listed on the National Priorities List of the US Environmental Protection Agency, and DOE is responsible for its cleanup. Contaminants are present in soil, surface water, and aquatic sediments. Alternatives identified for site remediation are no action (included as baseline for comparison), treatment and disposal of the wastes at the Weldon Spring site, and on-site treatment followed by off-site disposal at either a commercial facility near Clive, Utah, or at DOE`s Hanford site near Richland, Washington. In accordance with the requirements of the Endangered Species Act, this biological assessment has been prepared to evaluate the potential effects of proposed remedial action alternatives on federal listed (endangered or threatened) and candidate species at the respective sites. The assessment includes consideration of the environmental setting at each site; the federal listed and candidate species that could occur at each site; the construction, excavation, and treatment activities under each alternative; and the amount of land area affected at each site.

  13. Biological assessment for the remedial action at the chemical plant area of the Weldon Spring site

    Energy Technology Data Exchange (ETDEWEB)

    Hlohowskyj, I.; Dunn, C.P.

    1992-11-01

    The Weldon Spring site in St.Charles County, Missouri, became contaminated during the 1940s through the 1960s as a result of explosives production by the US Army and uranium and thorium processing by the predecessor agency of the US Department of Energy (DOE). The site is listed on the National Priorities List of the US Environmental Protection Agency, and DOE is responsible for its cleanup. Contaminants are present in soil, surface water, and aquatic sediments. Alternatives identified for site remediation are no action (included as baseline for comparison), treatment and disposal of the wastes at the Weldon Spring site, and on-site treatment followed by off-site disposal at either a commercial facility near Clive, Utah, or at DOE's Hanford site near Richland, Washington. In accordance with the requirements of the Endangered Species Act, this biological assessment has been prepared to evaluate the potential effects of proposed remedial action alternatives on federal listed (endangered or threatened) and candidate species at the respective sites. The assessment includes consideration of the environmental setting at each site; the federal listed and candidate species that could occur at each site; the construction, excavation, and treatment activities under each alternative; and the amount of land area affected at each site.

  14. Rehabilitation of former nuclear test sites in Australia

    International Nuclear Information System (INIS)

    1990-01-01

    A range of options with indicative cost estimates and timescale has been defined for clean-up of the former British nuclear test sites at Maralinga and Emu in South Australia. The situation at the former test sites on the Monte Bello Islands has been reported separately. The predominant contributor to potential radiation dose at the test sites is residual plutonium contamination of soil which may be incorporated into the body through inhalation of resuspended dust. Acceptable levels of radioactive soil contamination based upon organ doses from incorporated plutonium and the associated health detriment are proposed by the Technical Assessment Group for a series of land-use options ranging from fully unrestricted habitation by Aboriginals including the case of high dependence on local plants and animals for food: to casual access by Aboriginals assuming retained or, if necessary, extended fences. The area of land affected and the quantity of soil and other material with more than the proposed limit of contamination as well as a range of remedial measures for reduction of the contamination to a level acceptable for each of the land-use options has been assessed and methods proposed for safe disposal of the contaminated materials. The associated costs of these remedial measures and disposal methods have also been estimated. 28 refs., 71 tabs., 45 figs

  15. Environmental assessment of remedial action at the Maybell uranium mill tailings site near Maybell, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-01

    The purpose of this environmental assessment (EA) is to evaluate the environmental impacts resulting from remedial action at the Maybell uranium mill tailings site near Maybell, Colorado. A biological assessment (Attachment 1) and a floodplain/wetlands assessment (Assessment 2) are included as part of this EA. The following sections and attachments describe the proposed action, affected environment, and environmental impacts associated with the proposed remedial action, including impacts to threatened and endangered species listed or proposed for listing by the US Fish and Wildlife Service.

  16. Environmental assessment of remedial action at the Maybell uranium mill tailings site near Maybell, Colorado

    International Nuclear Information System (INIS)

    1993-09-01

    The purpose of this environmental assessment (EA) is to evaluate the environmental impacts resulting from remedial action at the Maybell uranium mill tailings site near Maybell, Colorado. A biological assessment (Attachment 1) and a floodplain/wetlands assessment (Assessment 2) are included as part of this EA. The following sections and attachments describe the proposed action, affected environment, and environmental impacts associated with the proposed remedial action, including impacts to threatened and endangered species listed or proposed for listing by the US Fish and Wildlife Service

  17. Managing Siting Activities for Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2012-06-15

    One of the IAEA's statutory objectives is to ''seek to accelerate and enlarge the contribution of atomic energy to peace, health and prosperity throughout the world''. One way this objective is achieved is through the publication of a range of technical series. Two of these are the IAEA Nuclear Energy Series and the IAEA Safety Standards Series. According to Article III.A.6 of the IAEA Statute, the safety standards establish 'standards of safety for protection of health and minimization of danger to life and property.' The safety standards include the Safety Fundamentals, Safety Requirements and Safety Guides. These standards are written primarily in a regulatory style, and are binding on the IAEA for its own programmes. The principal users are the regulatory bodies in Member States and other national authorities. The IAEA Nuclear Energy Series comprises reports designed to encourage and assist R and D on, and application of, nuclear energy for peaceful uses. This includes practical examples to be used by owners and operators of utilities in Member States, implementing organizations, academia, and government officials, among others. This information is presented in guides, reports on technology status and advances, and best practices for peaceful uses of nuclear energy based on inputs from international experts. The IAEA Nuclear Energy Series complements the IAEA Safety Standards Series. The introduction of nuclear power brings new challenges to States - one of them being the selection of appropriates sites. It is a project that needs to begin early, be well managed, and deploy good communications with all stakeholders; including regulators. This is important, not just for those States introducing nuclear power for the first time, but for any State looking to build a new nuclear power plant. The purpose of the siting activities goes beyond choosing a suitable site and acquiring a licence. A large part of the project is about producing and maintaining a validated

  18. Managing Siting Activities for Nuclear Power Plants

    International Nuclear Information System (INIS)

    2012-01-01

    One of the IAEA's statutory objectives is to ''seek to accelerate and enlarge the contribution of atomic energy to peace, health and prosperity throughout the world''. One way this objective is achieved is through the publication of a range of technical series. Two of these are the IAEA Nuclear Energy Series and the IAEA Safety Standards Series. According to Article III.A.6 of the IAEA Statute, the safety standards establish 'standards of safety for protection of health and minimization of danger to life and property.' The safety standards include the Safety Fundamentals, Safety Requirements and Safety Guides. These standards are written primarily in a regulatory style, and are binding on the IAEA for its own programmes. The principal users are the regulatory bodies in Member States and other national authorities. The IAEA Nuclear Energy Series comprises reports designed to encourage and assist R and D on, and application of, nuclear energy for peaceful uses. This includes practical examples to be used by owners and operators of utilities in Member States, implementing organizations, academia, and government officials, among others. This information is presented in guides, reports on technology status and advances, and best practices for peaceful uses of nuclear energy based on inputs from international experts. The IAEA Nuclear Energy Series complements the IAEA Safety Standards Series. The introduction of nuclear power brings new challenges to States - one of them being the selection of appropriates sites. It is a project that needs to begin early, be well managed, and deploy good communications with all stakeholders; including regulators. This is important, not just for those States introducing nuclear power for the first time, but for any State looking to build a new nuclear power plant. The purpose of the siting activities goes beyond choosing a suitable site and acquiring a licence. A large part of the project is about producing and maintaining a validated

  19. Approach of the safety of nuclear sites

    International Nuclear Information System (INIS)

    Faure, J.

    1991-08-01

    The implantation on a site of nuclear power plant, nuclear facility, laboratory or nuclear waste storage, or more generally a risk facility, require to take into account the aggression of the environment on the facility (earth quakes, explosions, inundations, aircraft crash...) and dangers presented by the facility on the environment (radioactive release, noise...). The consequences of releases on the environment aim to study and also the characteristics of the environment to evaluate the consequences in normal and accidental conditions [fr

  20. Site remediation using photocatalytic VOC destruction of chlorinated hydrocarbons

    Energy Technology Data Exchange (ETDEWEB)

    Brunet, R.A.H.; Pearcey, R.; Kittrell, J.R.; Mackin, G.; Wise, C.A.

    1999-07-01

    An innovative environmental technology has been developed and demonstrated for cost-effective control of toxic air emissions, such as trichloroethylene (TCE) and perchloroethylene (PCE), found in soil and groundwater at hazardous waste sites and in industrial effluents. The technology uses UV light and a proprietary photocatalyst to adsorb and destroy pollutants at ambient conditions, even with high humidity. Air stripping and soil vapor extraction efficiently transfer the pollutants to the gas phase, where they can be economically treated by photocatalysis without the risk of hazardous by-product formation. The AIR2000 photocatalytic technology was successfully installed at the Stamina Mills Superfund site in Rhode Island, where a commercial scale unit is treating 700 cfm of up to 1,000 ppm TCE, mixed with PCE, dichloroethylene (DCE), trichloroethane (TCA), and vinyl chloride (VC) produced through a combination of soil vapor extraction (SVE) and air stripping. As part of the EPA SITE program, the system was monitored for overall destruction removal efficiency (DRE) and hazardous by-product formation. A DRE in excess of 99% was reported over the first four months of operation, with greater than 99.99% DRE achieved, without production of hazardous by-products. The operating cost of the system is approximately 20% of activated carbon adsorption, which provides approximately $1,500,000 in cost savings over the life of the Stamina Mills project. The Adsorption Integrated Reaction (AIR) process is the recipient of the 1997 SBIR Technology of the Year award, the 1998 EPA Environmental Technology Innovator Award, and the 1998 R and D 100 Award.

  1. Assessment of former uranium sites and their ongoing remediation activities

    International Nuclear Information System (INIS)

    Khakimov, N.; Adkhamov, A.; Nazarov, Kh.M.; Mahmadov, T.; Mirsaidov, I.U.

    2012-01-01

    Carried out analysis on tailing's buildings operation shows that period for engineer barrier service, taking into account any catastrophic natural impacts, is too little in comparison with life-time of long-live radionuclides. Priorities should be defined by danger degree and isolation costs (protection optimization), therefore uncommon, non-traditional methods, developed taking into account natural factors for long-live waste (radionuclides) isolation are necessary. That's why, it is necessary to carry out specialized research and development, design and exploratory and other works on monitoring of social-ecological condition of these sites, as well as on demographic public diseases, living in these regions.

  2. Weldon Spring Site Remedial Action Project quarterly environmental data summary (QEDS) for fourth quarter 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-02-01

    This report contains the Quarterly Environmental Data Summary (QEDS) for the fourth quarter of 1998 in support of the Weldon Spring Site Remedial Action Project Federal Facilities Agreement. The data, except for air monitoring data and site KPA generated data (uranium analyses) were received from the contract laboratories, verified by the Weldon Spring Site verification group, and merged into the database during the fourth quarter of 1998. KPA results for on-site total uranium analyses performed during fourth quarter 1998 are included. Air monitoring data presented are the most recent complete sets of quarterly data.

  3. Effect of Remediation Parameters on in-Air Ambient Dose Equivalent Rates When Remediating Open Sites with Radiocesium-contaminated Soil.

    Science.gov (United States)

    Malins, Alex; Kurikami, Hiroshi; Kitamura, Akihiro; Machida, Masahiko

    2016-10-01

    Calculations are reported for ambient dose equivalent rates [H˙*(10)] at 1 m height above the ground surface before and after remediating radiocesium-contaminated soil at wide and open sites. The results establish how the change in H˙*(10) upon remediation depends on the initial depth distribution of radiocesium within the ground, on the size of the remediated area, and on the mass per unit area of remediated soil. The remediation strategies considered were topsoil removal (with and without recovering with a clean soil layer), interchanging a topsoil layer with a subsoil layer, and in situ mixing of the topsoil. The results show the ratio of the radiocesium components of H˙*(10) post-remediation relative to their initial values (residual dose factors). It is possible to use the residual dose factors to gauge absolute changes in H˙*(10) upon remediation. The dependency of the residual dose factors on the number of years elapsed after fallout deposition is analyzed when remediation parameters remain fixed and radiocesium undergoes typical downward migration within the soil column.

  4. Nuclear waste: Status of DOE's nuclear waste site characterization activities

    International Nuclear Information System (INIS)

    1987-01-01

    Three potential nuclear waste repository sites have been selected to carry out characterization activities-the detailed geological testing to determine the suitability of each site as a repository. The sites are Hanford in south-central Washington State, Yucca Mountain in southern Nevada, and Deaf Smith in the Texas Panhandle. Two key issues affecting the total program are the estimations of the site characterization completion data and costs and DOE's relationship with the Nuclear Regulatory Commission which has been limited and its relations with affected states and Indian tribes which continue to be difficult

  5. Case history update: RCRA waste site remediation by telerobotic methods

    International Nuclear Information System (INIS)

    Yemington, C.R.; Stone, J.

    1992-01-01

    This paper presents a summary of the first 18 months of closure work at the Kerr Hollow Quarry site on the DOE reservation at Oak Ridge, Tennessee. Closure work includes recovery and processing of explosive, toxic and radioactive waste. As of January 1992, more than 10,000 items had been processed and removed from the quarry, exclusively by remotely operated equipment. Drums, buckets, tubing assemblies and other containers are being shredded to react any explosive contents. Concussion and projectiles are controlled by operating the shredder under 30 feet of water. The performance of the shredder, the effectiveness of the approach, production rates and maintenance requirements are addressed in the paper. To avoid exposing personnel to hazards, all work in the restricted area is done remotely. Two remotely operated vehicles were used to clear a pad, set a stand and install the 200-hp shredder. Some materials exposed by shredding are stable in water but react when exposed to air. In addition, radioactive items are mixed in with the other wastes. Safety considerations have therefore led to use of remote techniques for handling and examining materials after recovery. Deteriorated gas cylinders, which may contain pressurized toxic materials, are recovered and handled exclusively by remotely operated equipment. Waste retrieval work at the Kerr Hollow Quarry has proven the capability and cost-effectiveness of remotely operated equipment to deal with a wide variety of hazardous materials in an unstructured waste site environment. A mixture of radioactive materials, toxic chemicals, explosives and asbestos has been found and processed. Remotely operated vehicles have retrieved, sorted and processed more than 10,000 items including drums, buckets, pipe manifolds, gas cylinders and other containers

  6. Applicability of petroleum horizontal drilling technology to hazardous waste site characterization and remediation

    International Nuclear Information System (INIS)

    Goranson, C.

    1992-09-01

    Horizontal wells have the potential to become an important tool for use in characterization, remediation and monitoring operations at hazardous waste disposal, chemical manufacturing, refining and other sites where subsurface pollution may develop from operations or spills. Subsurface pollution of groundwater aquifers can occur at these sites by leakage of surface disposal ponds, surface storage tanks, underground storage tanks (UST), subsurface pipelines or leakage from surface operations. Characterization and remediation of aquifers at or near these sites requires drilling operations that are typically shallow, less than 500-feet in depth. Due to the shallow nature of polluted aquifers, waste site subsurface geologic formations frequently consist of unconsolidated materials. Fractured, jointed and/or layered high compressive strength formations or compacted caliche type formations can also be encountered. Some formations are unsaturated and have pore spaces that are only partially filled with water. Completely saturated underpressured aquifers may be encountered in areas where the static ground water levels are well below the ground surface. Each of these subsurface conditions can complicate the drilling and completion of wells needed for monitoring, characterization and remediation activities. This report describes some of the equipment that is available from petroleum drilling operations that has direct application to groundwater characterization and remediation activities. A brief discussion of petroleum directional and horizontal well drilling methodologies is given to allow the reader to gain an understanding of the equipment needed to drill and complete horizontal wells. Equipment used in river crossing drilling technology is also discussed. The final portion of this report is a description of the drilling equipment available and how it can be applied to groundwater characterization and remediation activities

  7. The programme for remediation of contaminated mine sites: Its regulation and follow-up in Portugal

    International Nuclear Information System (INIS)

    Santiago Baptista, A.

    2005-01-01

    The policy of the Portuguese Government of assuming responsibility for remediating contaminated abandoned mine sites originated in an initiative taken between 1995 and 2001 by the General Directorate for the Environment and the Geological and Mining Institute. It has the aim of assessing and solving the prevailing environmental problems in some of the most contaminated abandoned mine sites in Portugal. On 6 July 2001, through Decree Law No. 198-A/2001, the Government defined the institutional and financial provisions to be adopted for implementing the environmental remediation programme. EXMIN-Industry and Mining Environmental Services S.A., a state owned company, was awarded an exclusive renewable contract on September 5 of the same year for a period of 10 years to implement this programme. Financing of the contract was guaranteed through EU funds under the FEDER programme, up to a maximum of Euro 52 million, to be spent before the end of the year 2006. In the beginning of 2002 a steering committee was nominated and took up its responsibilities, having been delegated a wide range of powers. At the same time the Ministers for Economic and Environmental Affairs delegated wide ranging powers to a technical evaluation subcommittee. The strategic definition of the targets of the old mine site remediation programme, which remains under the direct responsibility of the relevant ministers, highlights the importance of public health and safety and the social and economic development of the regions concerned. The information already gathered indicates that in total around 170 old mine sites require remediation. The time limit of 2006 for the availability of EU funds needs to be taken into consideration for the development of the remediation strategy. The specific situation of the old radioactive ore mines is described, as well as the status of the programme. (author)

  8. Soil remediation of a former power plant site in Tulita, Northwest Territories

    International Nuclear Information System (INIS)

    Pouliot, Y.; Thomassin-Lacroix, E.; Moreau, N.

    2005-01-01

    This paper outlines major stages of an ongoing remediation project caused by a power generating plant in the Dene Hamlet of Tulita. High levels of soil contamination were caused by the plant's operations as well as accidental petroleum hydrocarbon (PHC) spills. The decommissioning of the plant required that the site be remediated. Challenges faced by the remediators included the high level of contamination, the remote location of the community, as well as the fact that the site was located in the centre of the community. In addition, the soil in the impacted site was fine, and a 20 cm thick layer of peat acted as sponge, absorbing and trapping hydrocarbons. Remedial criteria was outlined according to Canada-Wide Standards for fine-grained soil in an industrial setting. The technology used for the project was Biopile, a process consisting of installing wells in the contaminated zone in order to provide the aeration required for PHC biodegradation and to condition the soil on a regular basis in order to promote optimal treatment conditions throughout the impacted material. Results indicated that the first 2 months were successful in reducing initial PHC levels. However, the following treatment season did not show as much degradation. An investigation revealed that nitrogen and phosphorus levels were insufficient to sustain microbial activity, as a result of lower than normal temperatures in the area for that season. Nutrients were added to the soil to re-establish the appropriate treatment conditions. It was concluded that the technology used presented numerous advantages. Overall disturbance of the area was reduced, and allowed other measures to be implemented, including segregation of the highly impacted peat layer. It was expected that remediation objectives for the entire site will be met by July 2005. 3 refs., 3 tabs

  9. Soil remediation of a former power plant site in Tulita, Northwest Territories

    Energy Technology Data Exchange (ETDEWEB)

    Pouliot, Y.; Thomassin-Lacroix, E. [Biogenie Inc., Lachenaie, PQ (Canada); Moreau, N. [Biogenie, Quebec City, PQ (Canada)

    2005-07-01

    This paper outlines major stages of an ongoing remediation project caused by a power generating plant in the Dene Hamlet of Tulita. High levels of soil contamination were caused by the plant's operations as well as accidental petroleum hydrocarbon (PHC) spills. The decommissioning of the plant required that the site be remediated. Challenges faced by the remediators included the high level of contamination, the remote location of the community, as well as the fact that the site was located in the centre of the community. In addition, the soil in the impacted site was fine, and a 20 cm thick layer of peat acted as sponge, absorbing and trapping hydrocarbons. Remedial criteria was outlined according to Canada-Wide Standards for fine-grained soil in an industrial setting. The technology used for the project was Biopile, a process consisting of installing wells in the contaminated zone in order to provide the aeration required for PHC biodegradation and to condition the soil on a regular basis in order to promote optimal treatment conditions throughout the impacted material. Results indicated that the first 2 months were successful in reducing initial PHC levels. However, the following treatment season did not show as much degradation. An investigation revealed that nitrogen and phosphorus levels were insufficient to sustain microbial activity, as a result of lower than normal temperatures in the area for that season. Nutrients were added to the soil to re-establish the appropriate treatment conditions. It was concluded that the technology used presented numerous advantages. Overall disturbance of the area was reduced, and allowed other measures to be implemented, including segregation of the highly impacted peat layer. It was expected that remediation objectives for the entire site will be met by July 2005. 3 refs., 3 tabs.

  10. DECHEM: A remedial planning tool for metallic contaminants in soil at UMTRA Project sites

    International Nuclear Information System (INIS)

    1989-03-01

    The DECHEM (DEcontamination of CHEMicals) method was developed for the Uranium Mill Tailings Remedial Action (UMTRA) Project to guide characterization and remedial planning for metals contamination in soils. This is necessary because non-radiological hazardous constituents may be more mobile than radium-226 (Ra-226), and hence may migrate more deeply into subpile soils (beneath tailings that are to be relocated) or into adjacent contaminated soils at UMTRA Project sites. The result is that remedial action to the Ra-226 excavation limit, as specified in the US Environmental Protection Agency (EPA) standards, may not adequately remove hazardous non-radiological contamination. Unmitigated, these contaminants in soil may cause health risks because of their presence in resuspended particles, their uptake by crops or fodder their seepage into aquifers used for drinking water or other possible exposure pathways. The DECHEM method was developed in response to the need for advanced planning for the remediation of chemical contaminants at UMTRA Project sites, and includes the following elements: Establishment of acceptable exposure rates for humans to chemicals, based on EPA guidelines or other toxicological literature. Modeling of chemical migration through environmental pathways from a remediated UMTRA Project site to humans. Determination of allowable residual concentrations (i.e., cleanup guidelines) for chemicals in soils that results in doses to humans that are below established acceptable exposure rates. The initial development and application of the DECHEM method has focused upon hazardous metallic contaminants such as arsenic, lead, molybdenum, and selenium, which are known to occur in elevated concentrations at some UMTRA Project sites

  11. Criteria and approaches for the remediation of sites contaminated with natural radionuclides in Germany

    International Nuclear Information System (INIS)

    Goldammer, W.

    1999-01-01

    In some parts of Germany substantial areas have been contaminated with naturally occurring radioactive material (NORM) from past activities. Particularly important are residues from past uranium mining operations (WISMUT), being subject to a massive 13 billion DM cleanup program, as well as other mining activities dealing with elevated levels of NORM. Decisions concerning the necessity and the required extent of remediation measures are based on a combination of criteria addressing limitations of maximum individual doses for critical groups as well as the optimization of the net benefit from the remediation. From these basic requirements secondary criteria have been derived, defining, for example, soil contamination levels below which a remediation is not required. The optimization analyses, carried-out to identify optimal remediation options, address radiological risks as well as short and long term costs within a cost-benefit analysis framework. Other relevant factors of influence, e.g. chemical risks or ecological damage, are incorporated as well. Comprehensive methodologies utilizing probabilistic methods have been developed to assess site conditions and possible remediation options on this basis. (author)

  12. Remedial action plan and site design for stabilization of the Inactive Uranium Mill Tailings Site, Maybell, Colorado. Final report, Appendixes to attachment 3

    International Nuclear Information System (INIS)

    1994-06-01

    This document contains supporting appendices to attachment 3 for the remedial action and site stabilization plan for Maybell, Colorado UMTRA site. Appendix A includes the Hydrological Services Calculations and Appendix B contains Ground Water Quality by Location data

  13. Comments and responses on the Remedial Action Plan and site design for stabilization of the Inactive Uranium Mill Tailings Site, Grand Junction, Colorado. Revision 1

    International Nuclear Information System (INIS)

    1994-01-01

    This report contains information concerning public comments and responses on the remedial action plan and site design for stabilization of the inactive uranium mill tailings site in Grand Junction, Colorado

  14. Remediation of uranium contaminated sites: clean-up activities in Serbia

    International Nuclear Information System (INIS)

    Raicevic, S.; Raicevic, J. . E-mail address of corresponding author: raich@beotel.yu; Raicevic, S.)

    2005-01-01

    One of the serious environmental problems in Serbia represent sites contaminated with depleted uranium (DU) during past war activities. According to UNEP reports and our findings there are two types of contamination: (i) localized points of high, concentrated contamination where DU penetrators enter the soil, and (ii) low level of widespread DU contamination, which indicates that during the conflict DU dust was dispersed into the environment. Remediation of these sites is an urgent need because they represent a permanent threat to the population living in this area. Here we give a brief description of approaches commonly used in remediation of DU contaminated sites, and an overview of current clean-up activities performed in Serbia. (author)

  15. Natural bioventing remediation from tidal wave action at a field site

    International Nuclear Information System (INIS)

    Kampbell, D.H.; Kittel, J.A.

    1996-01-01

    A remediation research study has been implemented at a jet fuel spill site on an island airport. A buried pipeline fracture several years ago resulted in a fuel spill exceeding 160,000 gallons. The site hydrogeology is a fragmented coral matrix with fresh water overlying more dense salt water. Water table fluctuations of about two feet occur once every twelve hours from tidal action. The research approach being pursued is to recover free-phase floating petroleum liquid using vacuum-mediated subsurface skimming wells. The vacuum will create an active vadose zone aeration to enhance aerobic biodegradation processes and vaporization of fuel. Once the floating fuel is removed, a natural bioventing action caused by tidal oscillations will complete remediation of the spill site

  16. New sorbents and ion exchangers for nuclear waste solution remediation

    International Nuclear Information System (INIS)

    Clearfield, A.; Peng, G.Z.; Cahill, R.A.; Bellinghausen, P.; Aly, H.I.; Scott, K.; Wang, J.D.

    1993-01-01

    There is now a concerted effort underway to clean up the accumulated nuclear wastes as the major sites around the country. Because of the complexity of the mixtures in the holding tanks highly specific exchangers are required to fulfill a multitude of desired tasks. These include removal of Cs + , Sr 2+ , Tc, Actinides and possible recovery of rare and precious metals. No one exchanger or sequestrant can accomplish these tasks and a variety of exchangers in a multistep process will be required. The behavior of a number of inorganic ion exchangers in a multistep process will be required. The behavior of a number of inorganic ion exchangers and new organo-inorganic exchangers towards Cs + , Sr 2+ and rare-earth ions in acid and basic media will be described. Preliminary data on the effect of high levels of sodium nitrate on the uptake of these ions will also be presented, as well as the changes observed in selectivity in simulated waste solutions. A possible separation scheme based on these data will be described

  17. Radionuclide metrology research for nuclear site decommissioning

    Science.gov (United States)

    Judge, S. M.; Regan, P. H.

    2017-11-01

    The safe and cost-effective decommissioning of legacy nuclear sites relies on accurate measurement of the radioactivity content of the waste materials, so that the waste can be assigned to the most appropriate disposal route. Such measurements are a new challenge for the science of radionuclide metrology which was established largely to support routine measurements on operating nuclear sites and other applications such as nuclear medicine. In this paper, we provide a brief summary of the international measurement system that is established to enable nuclear site operators to demonstrate that measurements are accurate, independent and fit for purpose, and highlight some of the projects that are underway to adapt the measurement system to meet the changing demands from the industry.

  18. In-Situ Radiological Surveys to Address Nuclear Criticality Safety Requirements During Remediation Activities at the Shallow Land Disposal Area, Armstrong County, Pennsylvania - 12268

    Energy Technology Data Exchange (ETDEWEB)

    Norris, Phillip; Mihalo, Mark; Eberlin, John; Lambert, Mike [Cabrera Services (United States); Matthews, Brian [Nuclear Safety Associates (United States)

    2012-07-01

    Cabrera Services Inc. (CABRERA) is the remedial contractor for the Shallow Land Disposal Area (SLDA) Site in Armstrong County Pennsylvania, a United States (US) Army Corps of Engineers - Buffalo District (USACE) contract. The remediation is being completed under the USACE's Formerly Utilized Sites Remedial Action Program (FUSRAP) which was established to identify, investigate, and clean up or control sites previously used by the Atomic Energy Commission (AEC) and its predecessor, the Manhattan Engineer District (MED). As part of the management of the FUSRAP, the USACE is overseeing investigation and remediation of radiological contamination at the SLDA Site in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), 42 US Code (USC), Section 9601 et. seq, as amended and, the National Oil and Hazardous Substance Pollution Contingency Plan (NCP), Title 40 of the Code of Federal Regulations (CFR) Section 300.430(f) (2). The objective of this project is to clean up radioactive waste at SLDA. The radioactive waste contains special nuclear material (SNM), primarily U-235, in 10 burial trenches, Cabrera duties include processing, packaging and transporting the waste to an offsite disposal facility in accordance with the selected remedial alternative as defined in the Final Record of Decision (USACE, 2007). Of particular importance during the remediation is the need to address nuclear criticality safety (NCS) controls for the safe exhumation and management of waste containing fissile materials. The partnership between Cabrera Services, Inc. and Measutronics Corporation led to the development of a valuable survey tool and operating procedure that are essential components of the SLDA Criticality Safety and Material Control and Accountability programs. Using proven existing technologies in the design and manufacture of the Mobile Survey Cart, the continued deployment of the Cart will allow for an efficient and reliable

  19. Remedial design process for Montclair/West Orange and Glen Ridge radium sites

    International Nuclear Information System (INIS)

    MacIndoe, M.; Johnson, R.; Paez-Restrepo, A.; Wilkinson, S.; Hyman, M.

    1994-01-01

    The Montclair/West Orange and Glen Ridge Superfund Sites, located in Essex County, New Jersey, are contaminated to varying degrees with radioactive materials. The waste materials originated from radium processing facilities prevalent in the area during the early 1900's. The two sites consist of 769 residential and commercial properties having a combined land area of approximately 210 acres. Historically, radioactive waste materials were disposed as landfill material in what were once rural areas. As development flourished, homes and streets were constructed over the landfilled waste. In 1981 the EPA conducted an aerial gamma radiation survey of the area to determine the presence of radioactive materials. It was from this survey that subsequent ground studies where initiated, and elevated gamma radiation and radon levels were discovered. The paper will discuss the methods used to obtain data through field investigations; the relationship between the interpretation of data to define the vertical and lateral limits of contamination and the selection of remedial design methods used to develop excavation plans; the evolution of remediation methods and technologies relative to the remediation of structures by underpinning basements, on-grade structures, and chimneys; removal of contaminated material beneath footings without cribbing; and demolition of basement foundation walls (where contaminated) without use of traditional support methods. Finally, the paper will discuss remedial action execution of the work

  20. Model testing for the remediation assessment of a radium contaminated site in Olen, Belgium

    International Nuclear Information System (INIS)

    Sweeck, Lieve; Kanyar, Bela; Krajewski, Pawel; Kryshev, Alexander; Lietava, Peter; Nenyei, Arpad; Sazykina, Tatiana; Yu, Charley; Zeevaert, Theo

    2005-01-01

    Environmental assessment models are used as decision-aiding tools in the selection of remediation options for radioactively contaminated sites. In most cases, the effectiveness of the remedial actions in terms of dose savings cannot be demonstrated directly, but can be established with the help of environmental assessment models, through the assessment of future radiological impacts. It should be emphasized that, given the complexity of the processes involved and our current understanding of how they operate, these models are simplified descriptions of the behaviour of radionuclides in the environment and therefore imperfect. One way of testing and improving the reliability of the models is to compare their predictions with real data and/or the predictions of other models. Within the framework of the Remediation Assessment Working Group (RAWG) of the BIOMASS (BIOsphere Modelling and ASSessment) programme coordinated by IAEA, two scenarios were constructed and applied to test the reliability of environmental assessment models when remedial actions are involved. As a test site, an area of approximately 100 ha contaminated by the discharges of an old radium extraction plant in Olen (Belgium) has been considered. In the first scenario, a real situation was evaluated and model predictions were compared with measured data. In the second scenario the model predictions for specific hypothetical but realistic situations were compared. Most of the biosphere models were not developed to assess the performance of remedial actions and had to be modified for this purpose. It was demonstrated clearly that the modeller's experience and familiarity with the mathematical model, the site and with the scenario play a very important role in the outcome of the model calculations. More model testing studies, preferably for real situations, are needed in order to improve the models and modelling methods and to expand the areas in which the models are applicable

  1. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Gunnison, Colorado: Remedial action selection report

    International Nuclear Information System (INIS)

    1992-10-01

    The Gunnison uranium mill tailings site is just south of the city limits of Gunnison, Colorado, in the south-central part of the state. The entire site covers 61 acres in the valley of the Gunnison River and Tomichi Creek. Contaminated materials at the Gunnison processing site include the tailings pile, covering about 35 acres to an average depth of nine feet and containing 459,000 cubic yards. Ore storage areas and the former mill processing area cover about 20 acres on the south side of the site. The volume of contaminated materials to be disposed of as part of the remedial action is estimated to be 718,900 cubic yards. An interim action was approved by the US Department of Energy to eliminate existing safety hazards to the Gunnison community. These actions, started in September 1991, included demolition of mill buildings and related processing facilities, excavation of two underground storage tanks, removal of asbestos and other hazardous materials from buildings, storage of those materials in a secured area on the site, and improvements of site security

  2. Environmental assessment of remedial action at the Lowman Uranium Mill Tailings Site near Lowman, Idaho

    International Nuclear Information System (INIS)

    1991-01-01

    This document assesses the environmental impacts of stabilization on site of the contaminated materials at the Lowman uranium mill tailings site. The Lowman site is 0.5 road mile northeast of the unincorporated village of Lowman, Idaho, and 73 road miles from Boise, Idaho. The Lowman site consists of piles of radioactive sands, an ore storage area, abandoned mill buildings, and windblown/waterborne contaminated areas. A total of 29.5 acres of land are contaminated and most of this land occurs within the 35-acre designated site boundary. The proposed action is to stabilize the tailings and other contaminated materials on the site. A radon barrier would be constructed over the consolidated residual radioactive materials and various erosion control measures would be implemented to ensure the long-term stability of the disposal cell. Radioactive constituents and other hazardous constituents were not detected in the groundwater beneath the Lowman site. The groundwater beneath the disposal cell would not become contaminated during or after remedial action so the maximum concentration limits or background concentrations for the contaminants listed in the draft EPA groundwater protection standards would be met at the point of compliance. No significant impacts were identified as a result of the proposed remedial action at the Lowman site

  3. Cleaning up a toxic legacy: Environmental remediation of former uranium production sites in Central Asia

    International Nuclear Information System (INIS)

    Green, Andrew

    2016-01-01

    Nearly 60 abandoned uranium production sites dot the landscape and represent a hazard to the environment and inhabitants throughout rural Kazakhstan, Kyrgyzstan, Tajikistan and Uzbekistan. Each site poses a challenge for local and national governments that lack technical expertise and resources for remediation. The sites were used to produce uranium until the 1990s. They were built before proper regulatory infrastructure was in place to ensure eventual decommissioning, so leftover residues with long-lived radioactive and highly toxic chemical contaminants still pose substantial risks to the health of the public and the environment.

  4. Cleaning up a toxic legacy: Environmental remediation of former uranium production sites in Central Asia

    International Nuclear Information System (INIS)

    Green, Andrew

    2016-01-01

    Nearly 60 abandoned uranium production sites dot the landscape and represent a hazard to the environment and inhabitants throughout rural Kazakhstan, Kyrgyzstan, Tajikistan and Uzbekistan. Each site poses a challenge for local and national governments that lack technical expertise and resources for remediation. The sites were used to produce uranium until the 1990s. They were built before proper regulatory infrastructure was in place to ensure eventual decommissioning, so leftover residues with long-lived radioactive and highly toxic chemical contaminants still pose substantial risks to the health of the public and the environment

  5. Completion of the uranium mill tailings remedial project and cleanup of the former mill site at Grand Junction, Colorado

    International Nuclear Information System (INIS)

    Rael, G.J.; Cox, S.W.; Artiglia, E.W.

    2000-01-01

    The United States Department of Energy's Uranium Mill Tailings Remedial Action (UMTRA) Surface Project has successfully completed the cleanup of 22 former uranium mill sites, more than 5400 vicinity properties, and has constructed 18 entombment cells. The Project has recently received the United States Nuclear Regulatory Commission's approval and certification for the last two disposal sites, with these sites being placed under the general license for long term custodial care of residual radioactive material. The UMTRA site located at Grand Junction, Colorado is a good example of the technical, political, economic, and public relations challenges that were overcome in achieving success. The UMTRA Team discussed, negotiated, planned, and eventually acted on this uranium mill tailings problem and brought the project to a successful conclusion for the community. From the early 1940s through the 1970s, uranium ore was mined in significant quantities under United States federal contracts for the government's national defence programmes, i.e. the Manhattan Engineering District and Atomic Energy Commission programmes. The problem started as the need for uranium decreased in the late 1960s, resulting in mills shutting down, leaving behind large quantities of process waste tailings and contaminated mill buildings. The former Climax Uranium Company mill site in Grand Junction was one of the largest of these sites. (author)

  6. Comment and response document for the final remedial action plan site design for stabilization of the Inactive Uranium Mill Tailings Sites at Slick Rock, Colorado

    International Nuclear Information System (INIS)

    1995-09-01

    This document consists of comments and responses; the reviewers are the U.S. Nuclear Regulatory Commission (NRC), Colorado Dept. of Public Health and Environment, and the remedial action contractor (RAC)

  7. Remedial investigation/feasibility study for the David Witherspoon, Inc., 901 Site, Knoxville, Tennessee: Volume 2, Appendixes

    International Nuclear Information System (INIS)

    1996-10-01

    This document contains the appendixes for the remedial investigation and feasibility study for the David Witherspoon, Inc., 901 site in Knoxville, Tennessee. The following topics are covered in the appendixes: (A) David Witherspoon, Inc., 901 Site Historical Data, (B) Fieldwork Plans for the David Witherspoon, Inc., 901 Site, (C) Risk Assessment, (D) Remediation Technology Discussion, (E) Engineering Support Documentation, (F) Applicable or Relevant and Appropriate Requirements, and (G) Cost Estimate Documentation

  8. Remedial investigation/feasibility study for the David Witherspoon, Inc., 901 Site, Knoxville, Tennessee: Volume 2, Appendixes

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-10-01

    This document contains the appendixes for the remedial investigation and feasibility study for the David Witherspoon, Inc., 901 site in Knoxville, Tennessee. The following topics are covered in the appendixes: (A) David Witherspoon, Inc., 901 Site Historical Data, (B) Fieldwork Plans for the David Witherspoon, Inc., 901 Site, (C) Risk Assessment, (D) Remediation Technology Discussion, (E) Engineering Support Documentation, (F) Applicable or Relevant and Appropriate Requirements, and (G) Cost Estimate Documentation.

  9. Remedial action plan for the inactive uranium processing site at Naturita, Colorado. Remedial action selection report: Attachment 2, geology report; Attachment 3, ground water hydrology report; Attachment 4, supplemental information

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    The uranium processing site near Naturita, Colorado, is one of 24 inactive uranium mill sites designated to be cleaned up by the U.S. Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), 42 USC {section} 7901 et seq. Part of the UMTRCA requires that the U.S. Nuclear Regulatory Commission (NRC) concur with the DOE`s remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the U.S. Environmental Protection Agency (EPA). This RAP serves two purposes. First, it describes the activities that are proposed by the DOE to accomplish remediation and long-term stabilization and control of the radioactive materials at the inactive uranium processing site near Naturita, Colorado. Second, this RAP, upon concurrence and execution by the DOE, the state of Colorado, and the NRC, becomes Appendix B of the cooperative agreement between the DOE and the state of Colorado.

  10. Weldon Spring Site Remedial Action Project approach to building dismantlement and demolition

    Energy Technology Data Exchange (ETDEWEB)

    Spittler, F.J.

    1996-01-01

    When remediation began at the Weldon Spring Site Remedial Action Project (WSSRAP), there were 41 buildings on site. Twenty-nine of these buildings were ancillary structures and were not used for processing radioactive material. Most of these have been torn down. The remaining 12 buildings were used for uranium and thorium processing or were major support structures, such as the laboratory. Two of the buildings were major processing operations occurred were successfully demolished in February of this year. Demolition of all structures will be complete in September of this year. To give an understanding of the magnitude of the work, the following is a description of the physical characteristics of the green salt building. This building was used to convert brown oxide (UO3) to green salt (UF4), which is the last intermediate step in purifying the mostly yellow cake feed material into uranium metal.

  11. Weldon Spring Site Remedial Action Project approach to building dismantlement and demolition

    International Nuclear Information System (INIS)

    Spittler, F.J.

    1996-01-01

    When remediation began at the Weldon Spring Site Remedial Action Project (WSSRAP), there were 41 buildings on site. Twenty-nine of these buildings were ancillary structures and were not used for processing radioactive material. Most of these have been torn down. The remaining 12 buildings were used for uranium and thorium processing or were major support structures, such as the laboratory. Two of the buildings were major processing operations occurred were successfully demolished in February of this year. Demolition of all structures will be complete in September of this year. To give an understanding of the magnitude of the work, the following is a description of the physical characteristics of the green salt building. This building was used to convert brown oxide (UO3) to green salt (UF4), which is the last intermediate step in purifying the mostly yellow cake feed material into uranium metal

  12. Successful community relations efforts at the Weldon Spring Site Remedial Action Project

    International Nuclear Information System (INIS)

    McKee, James E. Jr.; Meyer, Linda L.

    1992-01-01

    The Weldon Spring Site Remedial Action Project (WSSRAP) Community Relations Program involves many participants from the U.S. Department of Energy (DOE) and the Prime Management Contractor (PMC) composed of M.K. Ferguson and Jacobs Engineering. The proactive community relations plan exceeds the compliance requirements of NEPA and CERCLA and is coordinated by a three-person staff of professional communicators. The program permeates many of the operating decisions and the result has been public acceptance of the Project and its actions to date, which has been to conduct remedial actions that will place the site in a radiologically and chemically safe condition, eliminating potential hazards to the public and environment. (author)

  13. Review of selected 100-N waste sites related to N-Springs remediation projects

    International Nuclear Information System (INIS)

    DeFord, D.H.; Carpenter, R.W.

    1996-01-01

    This document has been prepared in support of the environmental restoration program at the US Department of Energy's Hanford Site near Richland, Washington, by the Bechtel Hanford, Inc. Facility and Waste Site Research Office. It provides historical information that documents and characterizes selected waste sites that are related to the N-Springs remediation projects. The N-Springs are a series of small, inconspicuous groundwater seepage springs located along the Columbia River shoreline near the 100-N Reactor. The spring site is hydrologically down-gradient from several 100-N Area liquid waste sites that are believed to have been the source(s) of the effluents being discharged by the springs. This report documents and characterizes these waste sites, including the 116-N-1 Crib and Trench, 116-N-3 Crib and Trench, unplanned releases, septic tariks, and a backwash pond

  14. Thermal desorption remediation in relation to landfill disposal at isolated sites in northern Alberta

    International Nuclear Information System (INIS)

    Walker, G.; Henze, M.; Fernuik, N.; MacKinnon, B.; Nelson, D.

    2005-01-01

    Thermal desorption (TD) involves the application of heat to organic-contaminated soil to release and thermally destruct contaminants using high temperatures. An overview of the technique used in the remediation of diesel-contaminated sites was presented. The paper was divided into 2 parts, the first of which provided an overview of TD at 2 electric company sites with a total of 29,000 tonnes of diesel-contaminated soil. Site contamination occurred mainly through the loading, storage and dispensing of diesel fuel. Petroleum lubricants, polychlorinated biphenyls (PCBs), polycyclic aromatic hydrocarbons (PAHs), glycols and metals were among the other contaminants. Remediation work was comprised of dig and dump (DD) or thermal desorption (TD) treatment of contaminated soils as well as the removal of underground facilities including concrete foundations, screw anchors, storage tanks, pipelines and grounding grids. The TD process, and productivity with both clay and sand soil types was reviewed, and an analysis of direct, indirect and total costs was presented. Issues concerning planning, production rates, practical field experience and quality control procedures were discussed, in addition to limitations such the treatment's inability to remediate metals, sensitivity to soil water content, and water demands for soil processing. The second section described the role of TD in a staged remediation for 46,000 tonnes of diesel-contaminated soil at Fox Lake, a remote northern community accessible by winter road and ice bridges. The challenges of ice bridge construction and maintenance, excavation backfilling and soil transport at low temperature were reviewed. An outline of consultation processes with First Nations was presented, as well as details of site operations and soil hauling, truck restrictions and coordination over the ice bridge, alternate backfill sources, and TD soil treatment of the contaminated soil. 2 tabs

  15. Citizen participation in nuclear waste repository siting

    International Nuclear Information System (INIS)

    Howell, R.E.; Olsen, D.

    1982-12-01

    The following study presents a proposed strategy for citizen participation during the planning stages of nuclear waste repository siting. It discusses the issue from the general perspective of citizen participation in controversial issues and in community development. Second, rural institutions and attitudes toward energy development as the context for developing a citizen participation program are examined. Third, major citizen participation techniques and the advantages and disadvantages of each approach for resolving public policy issues are evaluated. Fourth, principles of successful citizen participation are presented. Finally, a proposal for stimulating and sustaining effective responsible citizen participation in nuclear waste repository siting and management is developed

  16. Tackling the Challenge of Deep Vadose Zone Remediation at the Hanford Site

    Science.gov (United States)

    Morse, J. G.; Wellman, D. M.; Gephart, R.

    2010-12-01

    The Central Plateau of the Hanford Site in Washington State contains some 800 waste disposal sites where 1.7 trillion liters of contaminated water was once discharged into the subsurface. Most of these sites received liquids from the chemical reprocessing of spent uranium fuel to recover plutonium. In addition, 67 single shell tanks have leaked or are suspected to have leaked 3.8 million liters of high alkali and aluminate rich cesium-contaminated liquids into the sediment. Today, this inventory of subsurface contamination contains an estimated 550,000 curies of radioactivity and 150 million kg (165,000 tons) of metals and hazardous chemicals. Radionuclides range from mobile 99Tc to more immobilized 137Cs, 241Am, uranium, and plutonium. A significant fraction of these contaminants likely remain within the deep vadose zone. Plumes of groundwater containing tritium, nitrate, 129I and other contaminants have migrated through the vadose zone and now extend outward from the Central Plateau to the Columbia River. During most of Hanford Site history, subsurface studies focused on groundwater monitoring and characterization to support waste management decisions. Deep vadose zone studies were not a priority because waste practices relied upon that zone to buffer contaminant releases into the underlying aquifer. Remediation of the deep vadose zone is now central to Hanford Site cleanup because these sediments can provide an ongoing source of contamination to the aquifer and therefore to the Columbia River. However, characterization and remediation of the deep vadose zone pose some unique challenges. These include sediment thickness; contaminant depth; coupled geohydrologic, geochemical, and microbial processes controlling contaminant spread; limited availability and effectiveness of traditional characterization tools and cleanup remedies; and predicting contaminant behavior and remediation performance over long time periods and across molecular to field scales. The U

  17. Evaluation of surface water treatment and discharge options for the Weldon Spring Site Remedial Action Project

    International Nuclear Information System (INIS)

    Goyette, M.L.; MacDonell, M.M.

    1992-01-01

    The US Department of Energy (DOE), under its Environmental Restoration and Waste Management Program, is responsible for conducting response actions at the Weldon Spring site in St. Charles County, Missouri. The site consists of two noncontiguous areas: (1) the chemical plant area, which includes four raffinate pits and two small ponds, and (2) a 3.6-ha (9-acre) quarry located about 6.4 km (4 mi) southwest of the chemical plant area. Both of these areas became chemically and radioactively contaminated as a result of processing and disposal activities that took place from the 1940s through 1960s. The Weldon Spring site, located about 48 km (30 mi) west of St. Louis, is listed on the National Priorities List of the US Environmental Protection Agency. Nitroaromatic explosives were processed by the Army at the chemical plant area during the 1940s, and radioactive materials were processed by DOE's predecessor agency (the Atomic Energy Commission) during the 1950s and 1960s. Overall remediation of the Weldon Spring site is being addressed through the Weldon Spring Site Remedial Action Project, and it consists of several components. One component is the management of radioactively and chemically contaminated surface water impoundments at the chemical plant area -- i.e., the four raffinate pits, Frog Pond, and Ash Pond which was addressed under a separate action and documented in an engineering evaluation/cost analysis report. This report discusses the evaluation of surface water treatment at the Weldon Spring site

  18. Sites for locations of nuclear reactors

    International Nuclear Information System (INIS)

    Balcazar, M.; Huerta, M.; Lopez, A.

    2014-10-01

    A restriction on sites of nuclear energy is the history of seismic activity, in its magnitude (Richter) and intensity (Mercalli). This article delimits the areas of greatest magnitude and national seismic intensity, with restrictions of ground acceleration; the supplement areas with a low magnitude of seismic activity are shown. Potential sites for the location of these sites are introduced into a geographic information system. The set of geo-referenced data contains the location of the active volcanic manifestations; the historical record of earthquake epicenters, magnitudes and intensities; major geological faults; surface hydrology and water bodies; location of population density; protected areas; contour lines; the rock type or geology. The geographic information system allows entering normative criteria and environmental restrictions that correlate with geo-referenced data described above, forms both probable and exclusion areas for the installation of nuclear sites. (Author)

  19. Environmental assessment of remedial action at the Slick Rock uranium mill tailings sites, Slick Rock, Colorado

    International Nuclear Information System (INIS)

    1994-05-01

    The Uranium Mill Tailings Radiation Control Act of 1978 (42 USC section 7901 et seq.), hereafter referred to as the UMTRCA, authorized the US Department of Energy (DOE) to clean up two uranium mill tailings processing sites near Slick Rock, Colorado, in San Miquel County. Contaminated materials cover an estimated 63 acres of the Union Carbide (UC) processing site and 15 ac of the North Continent (NC) processing site. The sites are within 1 mile of each other and are adjacent to the Dolores River. The sites contain concrete foundations of mill buildings, tailings piles, and areas contaminated by windblown and waterborne radioactive tailings materials. The total estimated volume of contaminated materials is approximately 621,300 cubic yards (yd 3 ). In addition to the contamination in the two processing site areas, four VPs were found to contain contamination. As a result of the tailings being exposed to the environment, contamination associated with the UC and NC sites has leached into shallow ground water. Surface water has not been affected. The closest residence is approximately 0.3 air mi from either site. The proposed action is to remediate the UC and NC sites by removing all contaminated materials within the designing site boundaries or otherwise associated with the sites, and relocating them to, and stabilizing them at, a location approximately 5 road mi northeast of the sites on land administered by the Bureau of Land Management (BLM)

  20. Work plan for the remedial investigation/feasibility study-environmental assessment for the Colonie site, Colonie, New York

    International Nuclear Information System (INIS)

    1990-06-01

    This work plan has been prepared to document the scoping and planning process performed by the US Department of Energy (DOE) to support remedial action activities at the Colonie site. The site is located in eastern New York State in the town of Colonie near the city of Albany. Remedial action of the Colonie site is being planned as part of DOE's Formerly Utilized Sites Remedial Action Program. The DOE is responsible for controlling the release of all radioactive and chemical contaminants from the site. Under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), a remedial investigation/feasibility study (RI/FS) must be prepared to support the decision-making process for evaluating remedial action alternatives. This work plan contains a summary of information known about the site as of January 1988, presents a conceptual site model that identifies potential routes of human exposure to site containments, identifies data gaps, and summarizes the process and proposed studies that will be used to fill the data gaps. In addition, DOE activities must be conducted in compliance with the National Environmental Policy Act (NEPA), which requires consideration of the environmental consequences of a proposed action as part of its decision-making process. This work also describes the approach that will be used to evaluate potential remedial action alternatives and includes a description of the organization, project controls, and task schedules that will be employed to fulfill the requirements of both CERCLA and NEPA. 48 refs., 18 figs., 25 tabs

  1. How to solve nuclear siting problems

    International Nuclear Information System (INIS)

    Inhaber, H.

    1992-01-01

    In recent years, finding sites for nuclear facilities, both reactors and waste repositories, has become more of a problem. While all agree that the difficulties are more than technical, a technical solution is presently pursued. The reverse Dutch auction generates a solution to siting. It produces a volunteer community or state, at the same time retaining public safety and environmental standards. No coercion is required. Elements of the system already exist in a number of public policy areas. (orig.) [de

  2. Use of Historical Pump-and-Treat Data to Enhance Site Characterization and Remediation Performance Assessment.

    Science.gov (United States)

    Brusseau, Mark L

    2013-10-01

    Groundwater withdrawal and contaminant concentration data are routinely collected for pump-and-treat operations conducted at hazardous waste sites. These data sets can be mined to produce a wealth of information to support enhanced site characterization, optimization of remedial system operations, and improved decision making regarding long-term site management and closure. Methods that may be used to analyze and interpret pump-and-treat data to produce such assessments are presented, along with a brief illustration of their application to a site. The results presented herein illustrate that comprehensive analysis of pump-and-treat data is a powerful, cost-effective method for providing higher-resolution, value-added characterization of contaminated sites.

  3. The Expedited Remedial Action Program: A case study. The Alhambra Front Street manufactured gas plant site

    Energy Technology Data Exchange (ETDEWEB)

    Padleschat, J.A.; McMahon, T.D.

    1996-12-31

    Early in 1995, the Department of Toxic Substances Control asked Southern California Gas Company (SoCalGas) to enter one of its manufactured gas plant (MGP) sites into the new Expedited Remedial Action Program (ERAP). SoCalGas initially was not enthusiastic about the new program. Nevertheless, SoCalGas submitted an application for its Alhambra MGP site to be selected for the ERAP. The Alhambra Site was accepted into ERAP in November 1995, and was the first ERAP site to have orphan shares. MGP sites are well suited to the ERAP. They often involve few potentially responsible parties and can be expected to have the same primary contaminants: polycyclic aromatic hydrocarbons (PAH), which are a byproduct of the gas manufacturing process, and petroleum hydrocarbons from the crude oil feedstock used to manufacture the gas.

  4. Remedial action plan and site conceptual design for stabilization of the inactive uranium mill tailings sites at Rifle, Colorado. Appendix D, Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-02-01

    This appendix assesses the present conditions and data gathered about the two designated inactive uranium mill tailings sites near Rifle, Colorado, and the proposed disposal site six miles north of Rifle in the area of Estes Gulch. It consolidates available engineering, radiological, geotechnical, hydrological, meteorological, and other information pertinent to the design of the Remedial Action Plan (RAP). The data characterize conditions at the mill, tailings, and disposal site so that the Remedial Action Contractor (RAC) may complete final designs for the remedial actions.

  5. Remedial action plan and site conceptual design for stabilization of the inactive uranium mill tailings sites at Rifle, Colorado. Appendix D, Final report

    International Nuclear Information System (INIS)

    1992-02-01

    This appendix assesses the present conditions and data gathered about the two designated inactive uranium mill tailings sites near Rifle, Colorado, and the proposed disposal site six miles north of Rifle in the area of Estes Gulch. It consolidates available engineering, radiological, geotechnical, hydrological, meteorological, and other information pertinent to the design of the Remedial Action Plan (RAP). The data characterize conditions at the mill, tailings, and disposal site so that the Remedial Action Contractor (RAC) may complete final designs for the remedial actions

  6. Mitigation action plan for remedial action at the Uranium Mill Tailing Sites and Disposal Site, Rifle, Colorado

    International Nuclear Information System (INIS)

    1992-07-01

    The Estes Gulch disposal site is approximately 10 kilometers (6 miles) north of the town of Rifle, off State Highway 13 on Federal land administered by the Bureau of Land Management. The Department of Energy (DOE) will transport the residual radioactive materials (RRM) by truck to the Estes Gulch disposal site via State Highway 13 and place it in a partially below-grade disposal cell. The RRM will be covered by an earthen radon barrier, frost protection layers, and a rock erosion protection layer. A toe ditch and other features will also be constructed to control erosion at the disposal site. After removal of the RRM and disposal at the Estes Gulch site, the disturbed areas at all three sites will be backfilled with clean soils, contoured to facilitate surface drainage, and revegetated. Wetlands areas destroyed at the former Rifle processing sites will be compensated for by the incorporation of now wetlands into the revegetation plan at the New Rifle site. The UMTRA Project Office, supported by the Remedial Action Contractor (RAC) and the Technical Assistance Contractor (TAC), oversees the implementation of the MAP. The RAC executes mitigation measures in the field. The TAC provides monitoring of the mitigation actions in cases where mitigation measures are associated with design features. Site closeout and inspection compliance will be documented in the site completion report

  7. Colonie Interim Storage Site: Annual site environmental report, Colonie, New York, Calendar year 1986: Formerly Utilized Sites Remedial Action Program (FUSRAP)

    International Nuclear Information System (INIS)

    1987-06-01

    During 1986, the environmental monitoring program continued at the Colonie Interim Storage Site (CISS), a US Department of Energy (DOE) facility located in Colonie, New York. The CISS is part of the Formerly Utilized Sites Remedial Action Program (FUSRAP), a DOE program to decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation's atomic energy program or from commercial operations causing conditions that Congress has mandated DOE to remedy. As part of the decontamination research and development project authorized by Congress under the 1984 Energy and Water Appropriations Act, remedial action is being conducted at the site and at vicinity properties by Bechtel National Inc. (BNI), Project Management Contractor for FUSRAP. The environmental monitoring program is also carried out by BNI. The monitoring program at the CISS measures external gamma radiation levels as well as uranium and radium-226 concentrations in surface water, groundwater, and sediment. To verify that the site is in compliance with the DOE radiation protection standard and to assess the potential effect of the site on public health, the radiation dose was calculated for the maximally exposed individual. Based on the conservative scenario described in the report, the maximally exposed individual would receive an annual external exposure approximately equivalent to 5% of the DOE radiation protection standard of 100 mrem/y. Results of 1986 monitoring show that the CISS is in compliance with the DOE radiation protection standard. 14 refs., 9 figs., 9 tabs

  8. Aquifer characterization and groundwater modeling in support of remedial actions at the Weldon Spring Site

    International Nuclear Information System (INIS)

    Durham, L.A.; Carman, J.D.

    1993-01-01

    Aquifer characterization studies were performed to develop a hydrogeologic understanding of an unconfined shallow aquifer at the Weldon Spring site west of St. Louis, Missouri. The 88-ha site became contaminated because of uranium and thorium processing and disposal activities that took place from the 1940s through the 1960s. Slug and pumping tests provided valuable information on the lateral distribution of hydraulic conductivities, and packer tests and lithologic information were used to determine zones of contrasting hydrologic properties within the aquifer. A three-dimensional, finite- element groundwater flow model was developed and used to simulate the shallow groundwater flow system at the site. The results of this study show that groundwater flow through the system is predominantly controlled by a zone of fracturing and weathering in the upper portion of the limestone aquifer. The groundwater flow model, developed and calibrated from field investigations, improved the understanding of the hydrogeology and supported decisions regarding remedial actions at the site. The results of this study illustrate the value, in support of remedial actions, of combining field investigations with numerical modeling to develop an improved understanding of the hydrogeology at the site

  9. A case study of risk assessment in contaminated site remediation in China

    Science.gov (United States)

    Ye, S.; Guo, J.; Wu, J.; Wang, J.; Chien, C.; Stahl, R.; Mack, E.; Grosso, N.

    2013-12-01

    A field site in Nanjing, China was selected for a case study of risk assessment in contaminated site remediation. This site is about 100m long and 100m wide. A chemical plant (1999-2010) at the site manufactured optical brightener PF, 2-Amino-4-methylphenol and 2-Nitro-4-methylphenol, totally three products. Soil and groundwater samples were collected and analyzed for PPL 126 (126 pollutants in the 'Priority Pollutants List' issued by US EPA). Values of the Dutch Standards were used as the screening criteria for soil and ground water. Low levels of ethylbenezene, chlorobenzene, 1,3-dichlorobenzene and 1,4- dichlorobenzene were detected in one soil sample. Concentrations above Dutch Target Value (DTV) of benzene, toluene, ethylbenzene, chlorobenzene, 1,2-dichlorobenzene, 1,3-dichlorobenzene, 1,4-dichlorobenzene, and/or 1,2,4-trichlorobenzene, phenol, and/or 2,4-dichlorophenol were exhibited in two groundwater samples. The ground water was especially highly impacted by bichlorobenzenes and trichlorobenzenes. The maximum concentration of impacts was 7.3 mg/L of 1,2,4-trichlorobenzene in groundwater which was 730 times higher than Dutch Intervention Values (DIV). Risk of soil and groundwater at this site was assessed according to the guidelines issued by Chinese MEP and US EPA, respectively. Finally, remedy techniques were selected according to the result of risk assessment and the characteristics of hydrogeology conditions and contaminants.

  10. Declassification and restoration of nuclear sites

    International Nuclear Information System (INIS)

    Noynaert, L.; Rahier, A.; Deboodt, P.; Massaut, V.

    1998-09-01

    The report describes the legal and technical aspects of the declassification and restoration of nuclear sites. This involves a number of technical and administrative operations. Different declassification strategies are discussed. The evaluation of the risks and impact on the environment are discussed as well as research and development needs, costs and possible sources for funding

  11. Demographic characteristics of nuclear installations sites

    International Nuclear Information System (INIS)

    Doumenc, A.; Faure, J.

    1988-01-01

    The selection of a nuclear installations sites can not be conceived without a deep analysis of demographic context. This analysis permits to define the critical populations around the installation and is an essential element of emergency plans. 1 tab., 2 refs. (F.M.)

  12. Tank Waste Remediation System, Hanford Site, Richland, Washington. Final Environmental Impact Statement. Volume I

    International Nuclear Information System (INIS)

    1996-08-01

    This document, Volume 1 of the Final Environmental Impact Statement, analyzes the potential environmental consequences related to the Hanford Site Tank Waste Remediation System (TWRS) alternatives for management and disposal of radioactive, hazardous, and mixed waste, and the management and disposal of approximately 1,930 cesium and strontium capsules located at the Hanford Site. This waste is currently or projected to be stored in 177 underground storage tanks and approximately 60 miscellaneous underground storage tanks. This document analyzes the following alternatives for remediating the tank waste: No Action, Long-Term Management, In Situ Fill and Cap, In Situ Vitrification, Ex Situ Intermediate Separations, Ex Situ No Separations, Ex Situ Extensive Separations, Ex Situ/In Situ Combination 1, and Ex Situ/In Situ Combination 2. This document also addresses a Phased Implementation alternative (the DOE and Ecology preferred alternative for remediation of tank waste). Alternatives analyzed for the cesium and strontium capsules include: No Action, Onsite Disposal, Overpack and Ship, and Vitrify with Tank Waste. The DOE and Ecology preferred alternative for the cesium and strontium capsules is the No Action alternative

  13. Selected remedy at the Queen City Farms superfund site: A risk management approach

    International Nuclear Information System (INIS)

    Weber, E.F.; Wilson, J.; Kirk, M.; Tochko, S.

    1994-01-01

    A risk management approach at a former industrial waste disposal site in western Washington resulted in a selected remedy that is cost-effective and that meets the CERCLA threshold criterion of protecting human health and the environment. The proposed remedy, which addresses contamination in soil and groundwater, does not require an ARARs waiver and received state and community acceptance. By analyzing the current and potential risk at the site, a proposed remedy was chosen that would control the source and naturally attenuate the groundwater plume. Source control will include removal and treatment of some light nonaqueous phase liquid (LNAPL) and some soil, followed by isolation of the remaining soil and LNAPL within a slurry wall and beneath a multilayer cap. A contingent groundwater extraction and treatment system was included to address uncertainty in the risk characterization. Implementing source control is predicted to result in a steady decline in volatile organic compound levels in the drinking water aquifer through adsorption, degradation, and dispersion. Exposure to groundwater during the period of natural attenuation will be controlled by monitoring, institutional controls, and a thorough characterization of the plume and receptors. 7 figs., 1 tab

  14. Tank Waste Remediation System, Hanford Site, Richland, Washington. Final environmental impact statement. Summary

    International Nuclear Information System (INIS)

    1996-08-01

    This document analyzes the potential environmental consequences related to the Hanford Site Tank Waste Remediation System (TWRS) alternatives for management and disposal of radioactive, hazardous, and mixed waste, and the management and disposal of approximately 1,930 cesium and strontium capsules located at the Hanford Site. This waste is currently or projected to be stored in 177 underground storage tanks and approximately 60 miscellaneous underground storage tanks. This document analyzes the following alternatives for remediating the tank waste: No Action, Long-Term Management, In Situ Fill and Cap, In Situ Vitrification, Ex Situ Intermediate Separations, Ex Situ No Separations, Ex Situ Extensive Separations, Ex Situ/In Situ Combination 1, and Ex Situ/In Situ Combination 2. This document also addresses a Phased Implementation alternative (the DOE and Ecology preferred alternative for remediation of tank waste). Alternatives analyzed for the cesium and strontium capsules include: No Action, Onsite Disposal, Overpack and Ship, and Vitrify with Tank Waste. The DOE and Ecology preferred alternative for the cesium and strontium capsules is the No Action alternative

  15. TREATABILITY TEST PLAN FOR DEEP VADOSE ZONE REMEDIATION AT THE HANFORD'S SITE CENTRAL PLATEAU

    International Nuclear Information System (INIS)

    PETERSEN SW; MORSE JG; TRUEX MJ; LAST GV

    2007-01-01

    A treatability test plan has been prepared to address options for remediating portions of the deep vadose zone beneath a portion of the U.S. Department of Energy's (DOE's) Hanford Site. The vadose zone is the region of the subsurface that extends from the ground surface to the water table. The overriding objective of the treatability test plan is to recommend specific remediation technologies and laboratory and field tests to support the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 and Resource Conservation and Recovery Act of 1976 remedial decision-making process in the Central Plateau of the Hanford Site. Most of the technologies considered involve removing water from the vadose zone or immobilizing the contaminants to reduce the risk of contaminating groundwater. A multi-element approach to initial treatability testing is recommended, with the goal of providing the information needed to evaluate candidate technologies. The proposed tests focus on mitigating two contaminants--uranium and technetium. Specific technologies are recommended for testing at areas that may affect groundwater in the future, but a strategy to test other technologies is also presented

  16. Selection of remedial alternatives for mine sites: a multicriteria decision analysis approach.

    Science.gov (United States)

    Betrie, Getnet D; Sadiq, Rehan; Morin, Kevin A; Tesfamariam, Solomon

    2013-04-15

    The selection of remedial alternatives for mine sites is a complex task because it involves multiple criteria and often with conflicting objectives. However, an existing framework used to select remedial alternatives lacks multicriteria decision analysis (MCDA) aids and does not consider uncertainty in the selection of alternatives. The objective of this paper is to improve the existing framework by introducing deterministic and probabilistic MCDA methods. The Preference Ranking Organization Method for Enrichment Evaluation (PROMETHEE) methods have been implemented in this study. The MCDA analysis involves processing inputs to the PROMETHEE methods that are identifying the alternatives, defining the criteria, defining the criteria weights using analytical hierarchical process (AHP), defining the probability distribution of criteria weights, and conducting Monte Carlo Simulation (MCS); running the PROMETHEE methods using these inputs; and conducting a sensitivity analysis. A case study was presented to demonstrate the improved framework at a mine site. The results showed that the improved framework provides a reliable way of selecting remedial alternatives as well as quantifying the impact of different criteria on selecting alternatives. Copyright © 2013 Elsevier Ltd. All rights reserved.

  17. Case study: remediation of a former uranium mining/processing site in Hungary

    International Nuclear Information System (INIS)

    Csovari, M. et al.

    2004-01-01

    The Hungarian uranium mining activities near Pecs lasted from 1958 to 1997. Approximately 46 Mt of rock were mined, from which 18.8 Mt of upgraded ore were processed. Some ore had been exported prior to the construction of the processing plant at the site. Remediation of the former uranium-related industrial sites is being carried out by the Mecsek Ore Environment Ltd. and started in the 1990s. Today the former mines and their surroundings are rehabilitated, former heap piles and a number of smaller waste rock piles have been relocated to a more protected area (waste rock pile N 3). Ongoing core remediation activities are directed to the remediation of the tailings ponds, and also water treatment issues are most important. Three water treatment facilities are currently in operation: a mine water treatment system with the objective to remove uranium and gain a marketable by-product; a pump-and-treat system to restore the groundwater quality in the vicinity of the tailing ponds; a pilot-scale, experimental passive in-situ groundwater treatment system to avoid migration of uranium contaminated groundwater. Refs. 5 (author)

  18. Final audit report of remedial action construction at the UMTRA Project Ambrosia Lake, New Mexico, site

    International Nuclear Information System (INIS)

    1995-09-01

    The final audit report for remedial action at the Ambrosia Lake, New Mexico, Uranium Mill Tailings Remedial Action (UMTRA) Project site consists of a summary of the radiological surveillances/audits, quality assurance (QA) in-process surveillances, and a QA final closeout inspection performed by the US Department of Energy (DOE) and the Technical Assistance Contractor (TAC). One radiological surveillance and three radiological audits were performed at the Ambrosia Lake site. The surveillance was performed on 12--16 April 1993 (DOE, 1993d). The audits were performed on 26--29 July 1993 (DOE, 1993b); 21--23 March 1994 (DOE, 1994d); and 1--2 August 1994 (DOE, 1994d). The surveillance and audits resulted in 47 observations. Twelve of the observations raised DOE concerns that were resolved on site or through subsequent corrective action. All outstanding issues were satisfactorily closed out on 28 December 1994. The radiological surveillance and audits are discussed in this report. A total of seven QA in-process surveillances were performed at the Ambrosia Lake UMTRA site are discussed. The DOE/TAC Ambrosia Lake final remedial action close-out inspection was conducted on 26 July 1995 (DOE, 1995a). To summarize, a total of 155 observations were noted during DOE/TAC audit and surveillance activities. Follow-up to responses required from the RAC for the DOE/TAC surveillance and audit observations indicated that all issues related to the Ambrosia Lake site were resolved and closed to the satisfaction of the DOE

  19. Environmental Pathway Models-Ground-Water Modeling in Support of Remedial Decision Making at Sites Contaminated with Radioactive Material

    Science.gov (United States)

    The Joint Interagency Environmental Pathway Modeling Working Group wrote this report to promote appropriate and consistent use of mathematical environmental models in the remediation and restoration of sites contaminated by radioactive substances.

  20. Long-Term Groundwater Monitoring Optimization, Clare Water Supply Superfund Site, Permeable Reactive Barrier and Soil Remedy Areas, Clare, Michigan

    Science.gov (United States)

    This report contains a review of the long-term groundwater monitoring network for the Permeable Reactive Barrier (PRB) and Soil Remedy Areas at the Clare Water Supply Superfund Site in Clare, Michigan.

  1. Population distribution around French nuclear sites

    International Nuclear Information System (INIS)

    Bastien, M.C.

    1985-10-01

    With the help of two files respectively from the Institut geographique national (IGN) containing the geographic reference of all cities in France, and from the Institut national de la statistique et des etudes economiques (INSEE) containing the population figures of the 1982 census, the distribution of the population around a geographic point can be determined according to a given grid. Tables of population distribution around the 30 french nuclear sites were obtained by this method; however, at a short distance from a site, a detailed local examination/survey/investigation is necessary. Data shall have to be collected to estimate the non-french population around frontier sites [fr

  2. European Learning Initiatives for Nuclear Decommissioning and Environmental Remediation

    International Nuclear Information System (INIS)

    Abousahl, Said; )

    2017-01-01

    Situation nuclear decommissioning in the EU: - Demonstration of decommissioning at an industrial scale, as a 'last but feasible step' of the nuclear life-cycle, is essential for the credibility of the nuclear energy option; - Decommissioning market is in expansion, particularly in Europe; - Currently, an industrial experience exist, however... further attention is necessary for: - Development of the most suitable techniques, with respect to safety, efficiency and waste limitation; - Standardisation and harmonisation (incl. cost estimation); - Offering and promoting dedicated education and training opportunities; - Sharing knowledge and experiences. Offering and promoting dedicated Education and Training (E&T) opportunities: JRC organised jointly with the University of Birmingham in April 2015 a seminar on Education and Training in Nuclear Decommissioning, in an attempt to answer to the questions: •What are the E&T needs ? •What are the opportunities, what does already exist ? •How can we attract young talent ? Outcome of the seminar is published in a joint report with orientations on the way forward to support Education and Training in Nuclear Decommissioning in the EU

  3. Workbook for prioritizing petroleum industry exploration and production sites for remediation

    International Nuclear Information System (INIS)

    White, G.J.

    1998-01-01

    The purpose of this Workbook is to provide a screening-level method for prioritizing petroleum exploration and production sites for remediation that is based on readily available information, but which does not require a full characterization of the sites being evaluated. The process draws heavily from the Canadian National Classification System for Contaminated Sites, and fits into the framework for ecological risk assessment provided in guidance from the US Environmental Protection Agency. Using this approach, scoring guidelines are provided for a number of Evaluation Factors relating to: (1) the contaminants present at the site; (2) the potential exposure pathways for these contaminants; and (3) the potential receptors of those contaminants. The process therefore incorporates a risk-based corrective action (RBCA) framework to estimate the relative threat posed by a site to human health and to ecological systems. Physical (non-toxic) disturbance factors have also been incorporated into the process. It should also be noted that the process described in this Workbook has not yet been field tested at petroleum E and P sites. The first logical step in the field testing of this process is to apply the method at a small number of sites to assess the availability of the information that is needed to score each evaluation factor. Following this evaluation, the Workbook process should be applied at a series of sites to determine the effectiveness of the process at ranking sites according to their relative need for remediation. Upon completion of these tests, the Workbook should be revised to reflect the findings of the field tests

  4. Land contamination. Technical guidance on special sites: nuclear sites

    International Nuclear Information System (INIS)

    Hill, M.; Steeds, J.; Slade, N.

    2001-01-01

    Part IIA of the Environmental Protection Act 1990 sets out a regulatory regime for the identification and remediation of land where contamination is causing unacceptable risks to defined receptors. The Environment Agency has a number of regulatory roles under this regime. Where land is designated as a Special Site, as defined in the Contaminated Land (England) Regulations 2000, the Agency will act as the enforcing authority. It is expected that a similar regime will be introduced in Wales during 2001, but the reader should check whether definitions of Special Sites in the Welsh regulations are the same as in the English ones. The Environment Agency's approach to carrying out its regulatory responsibilities is set out in its Part RA Process Documentation,, available on the Agency website (www.environment-agency. gov.uk). This documentation sets out how the Agency intends to carry out its responsibilities under Part IIA of the Environmental Protection Act 1990, which came into force in England on 1 April 2000

  5. Proposed plan for remedial action at the quarry residuals operable unit of the Weldon Spring Site

    International Nuclear Information System (INIS)

    1998-03-01

    This proposed plan addresses the management of contamination present in various components of the quarry residuals operable unit (QROU) of the Weldon Spring site, which is located in St. Charles County, Missouri. The QROU consists of (1) residual waste at the quarry proper; (2) the Femme Osage Slough, Little Femme Osage Creek, and Femme Osage Creek; and (3) quarry groundwater located primarily north of the slough. Potential impacts to the St. Charles County well field downgradient of the quarry area are also being addressed as part of the evaluations for this operable unit. Remedial activities for the QROU will be conducted by the US Department of Energy (DOE) in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended. As part of the remedial investigation/feasibility study (RI/FS) process required for the QROU under CERCLA, three major evaluation documents have been prepared to support cleanup decisions for this operable unit. decisions for this operable unit

  6. Remedial investigation of the High-Explosives (HE) Process Area, Lawrence Livermore National Laboratory Site 300

    Energy Technology Data Exchange (ETDEWEB)

    Crow, N.B.; Lamarre, A.L.

    1990-08-01

    This report presents the results of a Remedial Investigation (RI) to define the extent of high explosives (HE) compounds and volatile organic compounds (VOCs) found in the soil, rocks, and ground water of the HE Process Area of Lawrence Livermore National Laboratory's (LLNL) Site 300 Facility. The report evaluates potential public health environmental risks associated with these compounds. Hydrogeologic information available before February 15, 1990, is included; however, chemical analyses and water-level data are reported through March 1990. This report is intended to assist the California Regional Water Quality Control Board (RWQCB)--Central Valley Region and the US Environmental Protection Agency (EPA) in evaluating the extent of environmental contamination of the LLNL HE Process Area and ultimately in designing remedial actions. 90 refs., 20 figs., 7 tabs.

  7. Fate of nuclear waste site remains unclear

    International Nuclear Information System (INIS)

    Anderson, E.V.

    1980-01-01

    The only commercial nuclear fuel reprocessing plant in the U.S., located in West Valley, N.Y., has been shut down since 1972, and no efforts have yet been made to clean up the site. The site contains a spent-fuel pool, high level liquid waste storage tanks, and two radioactive waste burial grounds. Nuclear Fuel Services, Inc., has been leasing the site from the New York State Energy RandD Authority. Federal litigation may ensue, prompted by NRC and DOE, if the company refuses to decontaminate the area when its lease expires at the end of 1980. DOE has developed a plan to solidify the liquid wastes at the facility but needs additional legislation and funding to implement the scheme

  8. Argonne's Expedited Site Characterization: An integrated approach to cost- and time-effective remedial investigation

    International Nuclear Information System (INIS)

    Burton, J.C.; Walker, J.L.; Aggarwal, P.K.; Meyer, W.T.

    1995-01-01

    Argonne National Laboratory has developed a methodology for remedial site investigation that has proven to be both technically superior to and more cost- and time-effective than traditional methods. This methodology is referred to as the Argonne Expedited Site Characterization (ESC). Quality is the driving force within the process. The Argonne ESC process is abbreviated only in time and cost and never in terms of quality. More usable data are produced with the Argonne ESC process than with traditional site characterization methods that are based on statistical-grid sampling and multiple monitoring wells. This paper given an overview of the Argonne ESC process and compares it with traditional methods for site characterization. Two examples of implementation of the Argonne ESC process are discussed to illustrate the effectiveness of the process in CERCLA (Comprehensive Environmental Response, Compensation, and Liability Act) and RCRA (Resource Conservation and Recovery Act) programs

  9. The siting of UK nuclear reactors.

    Science.gov (United States)

    Grimston, Malcolm; Nuttall, William J; Vaughan, Geoff

    2014-06-01

    Choosing a suitable site for a nuclear power station requires the consideration and balancing of several factors. Some 'physical' site characteristics, such as the local climate and the potential for seismic activity, will be generic to all reactors designs, while others, such as the availability of cooling water, the area of land required and geological conditions capable of sustaining the weight of the reactor and other buildings will to an extent be dependent on the particular design of reactor chosen (or alternatively the reactor design chosen may to an extent be dependent on the characteristics of an available site). However, one particularly interesting tension is a human and demographic one. On the one hand it is beneficial to place nuclear stations close to centres of population, to reduce transmission losses and other costs (including to the local environment) of transporting electricity over large distances from generator to consumer. On the other it is advantageous to place nuclear stations some distance away from such population centres in order to minimise the potential human consequences of a major release of radioactive materials in the (extremely unlikely) event of a major nuclear accident, not only in terms of direct exposure but also concerning the management of emergency planning, notably evacuation.This paper considers the emergence of policies aimed at managing this tension in the UK. In the first phase of nuclear development (roughly speaking 1945-1965) there was a highly cautious attitude, with installations being placed in remote rural locations with very low population density. The second phase (1965-1985) saw a more relaxed approach, allowing the development of AGR nuclear power stations (which with concrete pressure vessels were regarded as significantly safer) closer to population centres (in 'semi-urban' locations, notably at Hartlepool and Heysham)