  1. Modelling of nuclear power plant decommissioning financing.

    Science.gov (United States)

    Bemš, J; Knápek, J; Králík, T; Hejhal, M; Kubančák, J; Vašíček, J

    2015-06-01

    Costs related to the decommissioning of nuclear power plants create a significant financial burden for nuclear power plant operators. This article discusses the various methodologies employed by selected European countries for financing of the liabilities related to the nuclear power plant decommissioning. The article also presents methodology of allocation of future decommissioning costs to the running costs of nuclear power plant in the form of fee imposed on each megawatt hour generated. The application of the methodology is presented in the form of a case study on a new nuclear power plant with installed capacity 1000 MW.

  2. Innovative Nuclear Power Plant Building Arrangement in Consideration of Decommissioning

    Directory of Open Access Journals (Sweden)

    Won-Jun Choi

    2017-04-01

    Full Text Available A new concept termed the Innovative Nuclear Power Plant Building Arrangement (INBA strategy is a new nuclear power plant building arrangement method which encompasses upfront consideration of more efficient decommissioning. Although existing decommissioning strategies such as immediate dismantling and differed dismantling has the advantage of either early site restoration or radioactive decommissioning waste reduction, the INBA strategy has the advantages of both strategies. In this research paper, the concept and the implementation method of the INBA strategy will be described. Two primary benefits will be further described: (1 early site restoration; and (2 radioactive waste reduction. Several other potential benefits will also be identified. For the estimation of economic benefit, the INBA strategy, with two primary benefits, will be compared with the immediate dismantling strategy. The effect of a short life cycle nuclear power plant in combination with the INBA strategy will be reviewed. Finally, some of the major impediments to the realization of this strategy will be discussed.

  3. Innovative nuclear power plant building arragement in consideration of decommissioning

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Won Jun; Roh, Myung Sub; Kim, Chang Lak [Dept. of Nuclear Power Plant Engineering, KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of)

    2017-04-15

    A new concept termed the Innovative Nuclear Power Plant Building Arrangement (INBA) strategy is a new nuclear power plant building arrangement method which encompasses upfront consideration of more efficient decommissioning. Although existing decommissioning strategies such as immediate dismantling and differed dismantling has the advantage of either early site restoration or radioactive decommissioning waste reduction, the INBA strategy has the advantages of both strategies. In this research paper, the concept and the implementation method of the INBA strategy will be described. Two primary benefits will be further described: (1) early site restoration; and (2) radioactive waste reduction. Several other potential benefits will also be identified. For the estimation of economic benefit, the INBA strategy, with two primary benefits, will be compared with the immediate dismantling strategy. The effect of a short life cycle nuclear power plant in combination with the INBA strategy will be reviewed. Finally, some of the major impediments to the realization of this strategy will be discussed.

  4. A study on the optimization of plant life extension and decommissioning for the improvement of economy in nuclear power plant

    Energy Technology Data Exchange (ETDEWEB)

    Shin, Jae In; Jung, K. J.; Chung, U. S.; Baik, S. T.; Park, S. K.; Lee, D. G.; Kim, H. R.; Park, B. Y

    2001-01-01

    Fundamental concepts on the life extension of the nuclear power plant and decommissioning optimization were established from the domestic abroad information and case analyses. Concerning the decommissioning of the nuclear power plant, the management according to decommissioning stages was analyzed by the investigation of the standard of the decommissioning(decontamination dismantling) regulation. Moreover, basics were set for the decommissioning of domestic nuclear power plants and research reactors from the analyses on the decommissioning technology and precedence.

  5. The Decommissioning of the Trino Nuclear Power Plant

    Energy Technology Data Exchange (ETDEWEB)

    Brusa, L.; DeSantis, R.; Nurden, P. L.; Walkden, P.; Watson, B.

    2002-02-27

    Following a referendum in Italy in 1987, the four Nuclear Power Plants (NPPs) owned and operated by the state utility ENEL were closed. After closing the NPPs, ENEL selected a ''safestore'' decommissioning strategy; anticipating a safestore period of some 40-50 years. This approach was consistent with the funds collected during plant operation, and was reinforced by the lack of both a waste repository and a set of national free release limits for contaminated materials in Italy. During 1999, twin decisions were made to privatize ENEL and to transform the nuclear division into a separate subsidiary of the ENEL group. This group was renamed Sogin and during the following year, ownership of the company was transferred to the Italian Treasury. On formation, Sogin was asked by the Italian government to review the national decommissioning strategy. The objective of the review was to move from a safestore strategy to a prompt decommissioning strategy, with the target of releasing all of the nuclear sites by 2020. It was recognized that this target was conditional upon the availability of a national LLW repository together with interim stores for both spent fuel and HLW by 2009. The government also agreed that additional costs caused by the acceleration of the decommissioning program would be considered as stranded costs. These costs will be recovered by a levy on the kWh price of electricity, a process established and controlled by the Regulator of the Italian energy sector. Building on the successful collaboration to develop a prompt decommissioning strategy for the Latina Magnox reactor (1), BNFL and Sogin agreed to collaborate on an in depth study for the prompt decommissioning of the Sogin PWR at Trino. BNFL is currently decommissioning six NPPs and is at an advanced stage of planning for two further units, having completed a full and rigorous exercise to develop Baseline Decommissioning Plans (BDP's) for these stations. The BDP exercise

  6. Recent Trends in the Adequacy of Nuclear Plant Decommissioning Funding

    Energy Technology Data Exchange (ETDEWEB)

    Williams, D. G.

    2002-02-26

    Concerned about the potential cost and sufficiency of funds to decommission the nation's nuclear power plants, the Congress asked the U.S. General Accounting Office (GAO) to assess the adequacy, as of December 31, 1997, of electric utilities'; funds to eventually decommission their plants. GAO's report (GAO/RCED-99-75) on this issue addressed three alternative assumption scenarios--baseline (most likely), optimistic, and pessimistic; and was issued in May 1999. This paper updates GAO's baseline assessment of fund adequacy in 1997, and extends the analysis through 2000. In 2000, we estimate that the present value cost to decommission the nation's nuclear plants is about $35 billion; utility fund balances are about $29 billion. Both our two measures of funding adequacy for utilities are on average not only much above ideal levels, but also overall have greatly improved since 1997. However, certain utilities still show less than ideal fund balances and annual contributions. We suggest that the range of these results among the individual utilities is a more important policy measure to assess the adequacy of decommissioning funding than is the funding adequacy for the industry as a whole.

  7. A study on the optimization of plant life extension and decommissioning for the improvement of economy in nuclear power plant

    Energy Technology Data Exchange (ETDEWEB)

    Shin, Jae In; Jung, K. J.; Chung, U. S.; Baik, S. T.; Park, S. K.; Lee, D. G.; Kim, H. R.; Park, B. Y

    2000-01-01

    Fundamentals on the plan, the national policy, the safety securities for the life extension of the nuclear power plant was established from the domestic/abroad documents and case studies in relation with the life extension and decommissioning of the nuclear power plant. Concerning the decommissioning of the nuclear power plant, the management according to decommissioning stages was analyzed by the investigation of the domestic/abroad standard of the decommissioning (decontamination. dismantling) technology and regulation. Moreover, the study on the cost estimation method has been carried out for the decommissioning of the nuclear power plant. (author)

  8. Design of a requirements system for decommissioning of a nuclear power plant based on systems engineering

    Energy Technology Data Exchange (ETDEWEB)

    Park, Hee Seong; Park, Seung Kook; Jin, Hyung Gon; Song, Chan Ho; Choi, Jong won [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2015-10-15

    The nuclear industry has required an advanced system that can manage decommissioning information ever since the Korean government decide to decommission the Gori No.1 nuclear power plant. The D and D division at KAERI has been developing a system that can secure the reliability and sustainability of the decommissioning project based on the engineering system of the KRR-2 (Korean Research Reactor-2). To establish a decommissioning information system, a WBS that needs to be managed for the decommissioning of an NPP has been extracted, and requirements management research composed of system engineering technology has progressed. This paper propose a new type of system based on systems engineering technology. Even though a decommissioning engineering system was developed through the KRR-2, we are now developing an advanced decommissioning information system because it is not easy to apply this system to a commercial nuclear power plant. An NPP decommissioning is a project requiring a high degree of safety and economic feasibility. Therefore, we have to use a systematic project management at the initial phase of the decommissioning. An advanced system can manage the decommissioning information from preparation to remediation by applying a previous system to the systems engineering technology that has been widely used in large-scale government projects. The first phase of the system has progressed the requirements needed for a decommissioning project for a full life cycle. The defined requirements will be used in various types of documents during the decommissioning preparation phase.

  9. United States nuclear regulatory commission program for inspection of decommissioning nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Harris, P.W. [U.S. Nuclear Regulatory Commission, Washington, DC (United States)

    2001-07-01

    The United States Nuclear Regulatory Commission (USNRC or Commission) has been inspecting decommissioning commercial nuclear power plants in the United States (U.S.) since the first such facility permanently shutdown in September 1967. Decommissioning inspections have principally focused on the safe storage and maintenance of spent reactor fuel; occupational radiation exposure; environmental radiological releases; the dismantlement and decontamination of structures, systems, and components identified to contain or potentially contain licensed radioactive material; and the performance of final radiological survey of the site and remaining structures to support termination of the USNRC-issued operating license. Over the last 5 years, USNRC inspection effort in these areas has been assessed and found to provide reasonable confidence that decommissioning can be conducted safely and in accordance with Commission rules and regulations. Recently, the staff has achieved a better understanding of the risks associated with particular decommissioning accidents 1 and plans to apply these insights to amendments proposed to enhance decommissioning rules and regulations. The probabilities, scenarios, and conclusions resulting from this effort are being assessed as to their applicability to the inspection of decommissioning commercial power reactors. (author)

  10. About decommissioning of nuclear facilities

    Energy Technology Data Exchange (ETDEWEB)

    Brosche, Dieter [Bayernwerk AG, Muenchen (Germany); Klein, K. [Badenwerk AG, Kalrsruhe (Germany); Vollradt, Juergen [Vereinigte Elektrizitaetswerke Westfalen AG, Dortmund (Germany)

    2015-10-15

    The IAEA organised an International Symposium in 1978, which dealt with the main aspects of decommissioning nuclear plants. Sufficient practical experiences and elaborated decommissioning concepts and techniques are already available. Unsolvable problems or only solvable with tremendous efforts of time and expenses are according to the opinion of experts not to be expected. Important statements concern above all the dose load of the decommissioning staff and the costs for decommissioning.

  11. Decommissioning strategy and schedule for a multiple reactor nuclear power plant site

    Energy Technology Data Exchange (ETDEWEB)

    Monteiro, Deiglys Borges; Moreira, Joao M.L.; Maiorino, Jose Rubens, E-mail: deiglys.monteiro@ufabc.edu.br, E-mail: joao.moreira@ufabc.edu.br, E-mail: joserubens.maiorino@ufabc.edu.br [Universidade Federal do ABC (CECS/UFABC), Santo Andre, SP (Brazil). Centro de Engenharia, Modelagem e Ciencias Aplicadas

    2015-07-01

    The decommissioning is an important part of every Nuclear Power Plant life cycle gaining importance when there are more than one plant at the same site due to interactions that can arise from the operational ones and a decommissioning plant. In order to prevent undesirable problems, a suitable strategy and a very rigorous schedule should implemented and carried. In this way, decommissioning tasks such as fully decontamination and dismantling of activated and contaminated systems, rooms and structures could be delayed, posing as an interesting option to multiple reactor sites. The present work aims to purpose a strategy and a schedule for the decommissioning of a multiple reactor site highlighting the benefits of delay operational tasks and constructs some auxiliary services in the site during the stand by period of the shutdown plants. As a case study, will be presented a three-reactor site which the decommissioning process actually is in planning stage and that should start in the next decade. (author)

  12. Technology, safety, and costs of decommissioning a reference nuclear fuel reprocessing plant

    Energy Technology Data Exchange (ETDEWEB)

    Schneider, K.J.; Jenkins, C.E.; Rhoads, R.E.

    1977-09-01

    Safety and cost information were developed for the conceptual decommissioning of a fuel reprocessing plant with characteristics similar to the Barnwell Nuclear Fuel Plant. The main process building, spent fuel receiving and storage station, liquid radioactive waste storage tank system, and a conceptual high-level waste-solidification facility were postulated to be decommissioned. The plant was conceptually decommissioned to three decommissioning states or modes; layaway, protective storage, and dismantlement. Assuming favorable work performance, the elapsed time required to perform the decommissioning work in each mode following plant shutdown was estimated to be 2.4 years for layaway, 2.7 years for protective storage, and 5.2 years for dismantlement. In addition to these times, approximately 2 years of planning and preparation are required before plant shutdown. Costs, in constant 1975 dollars, for decommissioning were estimated to be $18 million for layaway, $19 million for protective storage and $58 million for dismantlement. Maintenance and surveillance costs were estimated to be $680,000 per year after layaway and $140,000 per year after protective storage. The combination mode of protective storage followed by dismantlement deferred for 10, 30, and 100 years was estimated to cost $64 million, $67 million and $77 million, respectively, in nondiscounted total 1975 dollars. Present values of these costs give reduced costs as dismantlement is deferred. Safety analyses indicate that radiological and nonradiological safety impacts from decommissioning activities should be small. The 50-year radiation dose commitment to the members of the public from airborne releases from normal decommissioning activities were estimated to be less than 11 man-rem.

  13. Nuclear power plant decommissioning. (Latest citations from the NTIS bibliographic database). Published Search

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-01-01

    The bibliography contains citations concerning phase-out and decommissioning of nuclear power plants worldwide. Included are case histories of the dismantling process, hazardous waste management, site monitoring, and economic aspects of the phase-out. Examples include European, Chinese, Eastern European, and United States facilities. (Contains 50-250 citations and includes a subject term index and title list.) (Copyright NERAC, Inc. 1995)

  14. Nuclear power plant decommissioning. (Latest citations from the NTIS bibliographic database). Published Search

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-01

    The bibliography contains citations concerning phase-out and decommissioning of nuclear power plants worldwide. Included are case histories of the dismantling process, hazardous waste management, site monitoring, and economic aspects of the phase-out. Examples include European, Chinese, Eastern European, and United States facilities. (Contains 50-250 citations and includes a subject term index and title list.) (Copyright NERAC, Inc. 1995)

  15. Analysis of the Possibility of Required Resources Estimation for Nuclear Power Plant Decommissioning Applying BIM

    Energy Technology Data Exchange (ETDEWEB)

    Jung, Insu [Korea Institute of construction Technology, Goyang (Korea, Republic of); Kim, Woojung [KHNP-Central Research Institute, Daejeon (Korea, Republic of)

    2014-05-15

    Estimation of decommissioning cost, decommissioning strategy, and decommissioning quantity at the time when entering into any decommissioning plans are some elements whose inputs are mandatory for nuclear power plant decommissioning. Ways to estimate decommissioning of required resources in the past have imposed great uncertainty since they analyze required resources at the construction stage, analyzing and consulting decommissioning required resources of overseas nuclear power plants. This study aims at analyzing whether required resources for decommissioning nuclear power plants can be estimated, applying BIM. To achieve this goal, this study analyzed the status quo of BIM such as definition, characteristics, and areas applied, and made use of them when drawing out study results by examining types and features of the tools realizing BIM. In order to review how BIM could be used for decommissioning nuclear power plants, the definition, characteristics and applied areas of BIM were discussed. BIM designs objects of the structures (walls, slabs, pillars, stairs, windows and doors, etc.) by 3D technology and endows attribute (function, structure and usage) information for each object, thereby providing visualized information of structures for participants in construction projects. Major characteristics of BIM attribute information are as follows: - Geometry: The information of objects is represented by measurable geometric information - Extensible object attributes: Objects include pre-defined attributes, and allow extension of other attributes. Any model that includes these attributes forms relationships with other various attributes in order to perform analysis and simulation. - All information including the attributes are integrated to ensure continuity, accuracy and accessibility, and all information used during the life cycle of structures are supported. This means that when information of required resources is added as another attributes other than geometric

  16. Environmental Problems Associated With Decommissioning The Chernobyl Nuclear Power Plant Cooling Pond

    Energy Technology Data Exchange (ETDEWEB)

    Farfan, E. B.; Jannik, G. T.; Marra, J. C.; Oskolkov, B. Ya.; Bondarkov, M. D.; Gaschak, S. P.; Maksymenko, A. M.; Maksymenko, V. M.; Martynenko, V. I.

    2009-11-09

    Decommissioning of nuclear power plants and other nuclear fuel cycle facilities has been an imperative issue lately. There exist significant experience and generally accepted recommendations on remediation of lands with residual radioactive contamination; however, there are hardly any such recommendations on remediation of cooling ponds that, in most cases, are fairly large water reservoirs. The literature only describes remediation of minor reservoirs containing radioactive silt (a complete closure followed by preservation) or small water reservoirs resulting in reestablishing natural water flows. Problems associated with remediation of river reservoirs resulting in flooding of vast agricultural areas also have been described. In addition, the severity of environmental and economic problems related to the remedial activities is shown to exceed any potential benefits of these activities. One of the large, highly contaminated water reservoirs that require either remediation or closure is Karachay Lake near the MAYAK Production Association in the Chelyabinsk Region of Russia where liquid radioactive waste had been deep well injected for a long period of time. Backfilling of Karachay Lake is currently in progress. It should be noted that secondary environmental problems associated with its closure are considered to be of less importance since sustaining Karachay Lake would have presented a much higher radiological risk. Another well-known highly contaminated water reservoir is the Chernobyl Nuclear Power Plant (ChNPP) Cooling Pond, decommissioning of which is planned for the near future. This study summarizes the environmental problems associated with the ChNPP Cooling Pond decommissioning.

  17. ENVIRONMENTAL PROBLEMS ASSOCIATED WITH DECOMMISSIONING THE CHERNOBYL NUCLEAR POWER PLANT COOLING POND

    Energy Technology Data Exchange (ETDEWEB)

    Farfan, E.

    2009-09-30

    Decommissioning of nuclear power plants and other nuclear fuel cycle facilities has been an imperative issue lately. There exist significant experience and generally accepted recommendations on remediation of lands with residual radioactive contamination; however, there are hardly any such recommendations on remediation of cooling ponds that, in most cases, are fairly large water reservoirs. The literature only describes remediation of minor reservoirs containing radioactive silt (a complete closure followed by preservation) or small water reservoirs resulting in reestablishing natural water flows. Problems associated with remediation of river reservoirs resulting in flooding of vast agricultural areas also have been described. In addition, the severity of environmental and economic problems related to the remedial activities is shown to exceed any potential benefits of these activities. One of the large, highly contaminated water reservoirs that require either remediation or closure is Karachay Lake near the MAYAK Production Association in the Chelyabinsk Region of Russia where liquid radioactive waste had been deep well injected for a long period of time. Backfilling of Karachay Lake is currently in progress. It should be noted that secondary environmental problems associated with its closure are considered to be of less importance since sustaining Karachay Lake would have presented a much higher radiological risk. Another well-known highly contaminated water reservoir is the Chernobyl Nuclear Power Plant (ChNPP) Cooling Pond, decommissioning of which is planned for the near future. This study summarizes the environmental problems associated with the ChNPP Cooling Pond decommissioning.

  18. Cutting Technology for Decommissioning of the Reactor Pressure Vessels in Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Jeong, Kwan Seong; Kim, Geun Ho; Moon, Jei Kwon; Choi, Byung Seon [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2012-05-15

    Lots of nuclear power plants have been decommissioned during the last 2 decades. An essential part of this work is the dismantling of the Reactor Pressure Vessel and its Internals. For this purpose a wide variety of different cutting technologies have been developed, adapted and applied. A detailed introduction to Plasma Arc cutting, Contact Arc Metal cutting and Abrasive Water Suspension Jet cutting is given, as it turned out that these cutting technologies are particularly suitable for these type of segmentation work. A comparison of these technologies including gaseous emissions, cutting power, manipulator requirements as well as selected design approaches are given. Process limits as well as actual limits of application are presented

  19. Legal aspects of shut-down and decommissioning of nuclear power plants; Rechtsfragen der Stilllegung und des Rueckbaus von Kernkraftwerken

    Energy Technology Data Exchange (ETDEWEB)

    Leidinger, Tobias [Luther Rechtsanwaltsgesellschaft, Duesseldorf (Germany)

    2016-10-15

    The legally phase-out the peaceful use of nuclear energy in Germany has put into focus the topics decommissioning and dismantling of nuclear power plants. Technically and legally issues have to be managed, which are often closely connected. From a legal perspective it is important, that the initial situation of operation and operation phases of the nuclear power plant are settled. Some of the most relevant legal issues are more accurate presented and discussed. They are related to the period after shut-down and before granting the decommissioning license.

  20. Recommended values for the distribution coefficient (Kd) to be used in dose assessments for decommissioning the Zion Nuclear Power Plant

    Energy Technology Data Exchange (ETDEWEB)

    Sullivan T.

    2014-06-09

    ZionSolutions is in the process of decommissioning the Zion Nuclear Power Plant. The site contains two reactor Containment Buildings, a Fuel Building, an Auxiliary Building, and a Turbine Building that may be contaminated. The current decommissioning plan involves removing all above grade structures to a depth of 3 feet below grade. The remaining underground structures will be backfilled. The remaining underground structures will contain low amounts of residual licensed radioactive material. An important component of the decommissioning process is the demonstration that any remaining activity will not cause a hypothetical individual to receive a dose in excess of 25 mrem/y as specified in 10CFR20 SubpartE.

  1. Recommended values for the distribution coefficient (Kd) to be used in dose assessments for decommissioning the Zion Nuclear Power Plant

    Energy Technology Data Exchange (ETDEWEB)

    Sullivan, T. [Brookhaven National Lab. (BNL), Upton, NY (United States)

    2014-09-24

    ZionSolutions is in the process of decommissioning the Zion Nuclear Power Plant. The site contains two reactor Containment Buildings, a Fuel Building, an Auxiliary Building, and a Turbine Building that may be contaminated. The current decommissioning plan involves removing all above grade structures to a depth of 3 feet below grade. The remaining underground structures will be backfilled. The remaining underground structures will contain low amounts of residual licensed radioactive material. An important component of the decommissioning process is the demonstration that any remaining activity will not cause a hypothetical individual to receive a dose in excess of 25 mrem/y as specified in 10CFR20 SubpartE.

  2. Decommissioning of nuclear power plants in the US - a travel report; Avveckling av kaernkraftverk i USA - en reserapport

    Energy Technology Data Exchange (ETDEWEB)

    Efraimsson, H.; Lindhe, J.C.; Malmqvist, L.; Lund, I.; Welleman, E

    1999-03-01

    This report summarises information and impressions from a journey in north-east USA. The purpose of the journey was to study the on-going decommissioning of nuclear power plants - mainly how it is regulated by the competent authorities, but also how it is performed in practice. The journey included visits at the US Nuclear Regulatory Commission, the company Duke Engineering and Services, and the two nuclear power plants Haddam Neck and Maine Yankee

  3. Assessment of the radiological impact of a decommissioning nuclear power plant in Italy

    CERN Document Server

    Petraglia, A; De Cesare, M; De Cesare, N; Quinto, F; Terrasi, F; D'Onofrio, A; Steier, P; Fifield, L K; Esposito, A M; 10.1051/radiopro/2012010

    2012-01-01

    The assessment of the radiological impact of a decommissioning Nuclear Power Plant is presented here through the results of an environmental monitoring survey carried out in the area surrounding the Garigliano Power Plant. The levels of radioactivity in soil, water, air and other environmental matrices are shown, in which {\\alpha}, {\\beta} and {\\gamma} activity and {\\gamma} equivalent dose rate are measured. Radioactivity levels of the samples from the Garigliano area are analyzed and then compared to those from a control zone situated more than 100 km away. Moreover, a comparison is made with a previous survey held in 2001. The analyses and comparisons show no significant alteration in the radiological characteristics of the area surroundings the plant, with an overall radioactivity depending mainly from the global fallout and natural sources.

  4. Direction for the Estimation of Required Resources for Nuclear Power Plant Decommissioning based on BIM via Case Study

    Energy Technology Data Exchange (ETDEWEB)

    Jung, Insu [Korea Institute of Construction Technology, Goyang (Korea, Republic of); Kim, Woojung [KHNP-Central Research Institute, Daejeon (Korea, Republic of)

    2014-05-15

    Ways to estimate decommissioning of required resources in the past have imposed great uncertainty since they analyze required resources at the construction stage, analyzing and consulting decommissioning required resources of overseas nuclear power plants. As demands on efficient management and use of complicated construction information increased these days, demands on the introduction of Building Information Modeling (herein after referred to as BIM) technology has increased. In the area of quotation, considerable effects are expected as to the accuracy and reliability predicting construction costs through the characteristics that can automatically estimate quantities by using attribute information of BIM model. BIM-based estimation and quotation of required resources is more accurate than the existing 2D-based quotations and have many advantages such as reviews over constructability and interference. It can be desirable to estimate decommissioning required resources in nuclear power plants using BIM as well as using tools that are compatible with usual international/industrial standards. As we looked into the cases where required resources were estimated, using BIM in Korea and abroad, they dealt with estimation of required resources, estimation of construction cost and process management at large. In each area, methodologies, classification systems, BIM, and realization tests have been used variably. Nonetheless, several problems have been reported, and among them, it is noticeable that although BIM standard classification system exists, no case was found that has used standard classification system. This means that no interlink among OBS (Object Breakdown Structure), WBS (Work Breakdown Structure) and CBS (Cost Breakdown Structure) was possible. Thus, for nuclear power plant decommissioning, decommissioning method and process, etc. shall be defined clearly in the stage of decommissioning strategy establishment, so that classification systems must be set up

  5. Disposal of Steam Generators from Decommissioning of PWR Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Walberg, Mirko; Viermann, Joerg; Beverungen, Martin [GNS Gesellschaft fuer Nuklear-Service mbH, Hollestrasse 7A, 45127 Essen (Germany); Kemp, Lutz [Kernkraftwerk Stade GmbH and Co.oHG, Bassenflether Chaussee, 21683 Stade (Germany); Lindstroem, Anders [Studsvik Nuclear AB, SE-611 82 Nykoeping (Sweden)

    2008-07-01

    Amongst other materials remarkable amounts of radioactively contaminated or activated scrap are generated from the dismantling of Nuclear Power Plants. These scrap materials include contaminated pipework, fittings, pumps, the reactor pressure vessel and other large components, most of them are heat exchangers. Taking into account all commercial and technical aspects an external processing and subsequent recycling of the material might be an advantageous option for many of these components. The disposal of steam generators makes up an especially challenging task because of their measures, their weight and compared to other heat exchangers high radioactive inventory. Based on its experiences from many years of disposal of smaller components of NPP still in operation or under decommissioning GNS and Studsvik Nuclear developed a concept for disposal of steam generators, also involving experiences made in Sweden. The concept comprises transport preparations and necessary supporting documents, the complete logistics chain, steam generator treatment and the processing of arising residues and materials not suitable for recycling. The first components to be prepared, shipped and treated according to this concept were four steam generators from the decommissioning of the German NPP Stade which were removed from the plant and shipped to the processing facility during the third quarter of 2007. Although the plant had undergone a full system decontamination, due to the remaining contamination in a number of plugged tubes the steam generators had to be qualified as industrial packages, type 2 (IP-2 packages), and according to a special requirement of the German Federal Office for Radiation Protection a license for a shipment under special arrangement had to be applied for. The presentation gives an overview of the calculations and evidences required within the course of the IP-2 qualification, additional requirements of the competent authorities during the licensing procedure as

  6. Long-lived radionuclides in residues from operation and decommissioning of nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Lopez-Gutierrez, J.M., E-mail: lguti@us.es [Centro Nacional de Aceleradores (CNA), c/Thomas Alva Edison n Degree-Sign 7, 41092 Sevilla (Spain); University of Sevilla, Departamento de Fisica Aplicada I, c/Virgen de Africa, n Degree-Sign 7, 41011 Sevilla (Spain); Gomez-Guzman, J.M.; Chamizo, E.; Peruchena, J.I. [Centro Nacional de Aceleradores (CNA), c/Thomas Alva Edison n Degree-Sign 7, 41092 Sevilla (Spain); Garcia-Leon, M. [University of Sevilla, Departamento de Fisica Atomica, Molecular y Nuclear, Apdo. 1065, 41080 Sevilla (Spain)

    2013-01-15

    Radioactive residues, in order to be classified as Low-Level Waste (LLW), need to fulfil certain conditions; the limitation of the maximum activity from long-lived radionuclides is one of these requirements. In order to verify compliance to this limitation, the abundance of these radionuclides in the residue must be determined. However, performing this determination through radiometric methods constitutes a laborious task. In this work, {sup 129}I concentrations, {sup 239+240}Pu activities, and {sup 240}Pu/{sup 239}Pu ratios are determined in low-level radioactive residues, including resins and dry sludge, from nuclear power plants in Spain. The use of Accelerator Mass Spectrometry (AMS) enables high sensitivities to be achieved, and hence these magnitudes can be re determined with good precision. Results present a high dispersion between the {sup 129}I and {sup 239+240}Pu activities found in various aliquots of the same sample, which suggests the existence of a mixture of resins with a variety of histories in the same container. As a conclusion, it is shown that activities and isotopic ratios can provide information on the processes that occur in power plants throughout the history of the residues. Furthermore, wipes from the monitoring of surface contamination of the Jose Cabrera decommissioning process have been analyzed for {sup 129}I determination. The wide range of measured activities indicates an effective dispersal of {sup 129}I throughout the various locations within a nuclear power plant. Not only could these measurements be employed in the contamination monitoring of the decommissioning process, but also in the modelling of the presence of other iodine isotopes.

  7. Development of Heavy-Duty and High-Precision Hydraulic Manipulator for Inspection, Maintenance and Decommission of Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Sung Uk; Seo, Yong-chil; Jung, Kyung Min; Kim, Chang-hoi; Choi, Byung-seon; Moon, Jei-kwon [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2016-10-15

    Robotic manipulators have been used for inspection, maintenance and decommission of nuclear power plants because nuclear power plants have high radiation and human workers cannot easily access the plants. And also, to inspecting, maintaining and decommissioning nuclear power plants require various manipulators. Only one manipulator cannot response to many required tasks. The existing manipulators that was used at nuclear power plants can only operate only focused specific task and cannot be used at several tasks. The actuators used at manipulators are varied and many companies sell actuators depending on power, torque and speed. However, the commercial product is not standardized. Therefore, the development of manipulator is time consuming and expensive. The essential item of a manipulator is an actuator module. If actuator module is standardized, it’s easier to develop a manipulator and also maintain a manipulator. Recently, manipulator having high-radiation, high-duty and high-precision is necessary to inspection, maintain and decommissioning of nuclear power plants. Hydraulic actuator has been used to development high-duty manipulator. But control performance of a hydraulic actuator is not better than that of an electric actuator so that hydraulic manipulator cannot easily satisfy the required precision. In this paper, we developed high-duty and high-precision actuator modules and hydraulic manipulator using the developed actuator modules. The developed hydraulic manipulator have a payload of 250kg and a precision of ±1mm. Four modularized hydraulic actuator modules were developed for inspection, maintenance and decommission. Using the developed actuator modules, the manipulator for decommissioning is easily developed. And also, various manipulators having different kinematic structure for specific tasks will be easily developed by using hydraulic modules.

  8. VGH Mannheim: legitimacy of the decommissioning license for a nuclear power plant; VGH Mannheim: Rechtmaessigkeit der Stilllegungsgenehmigung fuer ein Kernkraftwerk

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    2015-03-16

    The contribution describes the details of the court (VGH) decision on the legitimacy of the decommissioning license for the NPP Obrigheim. Inhabitants of the neighborhood (3 to 4.5 km distance from the NPP) are suspect hazards for life, health and property due to the dismantling of the nuclear power plant in case of an accident during the licensed measures or a terroristic attack with radioactive matter release.

  9. Joint U.S./Russian Study on the Development of a Preliminary Cost Estimate of the SAFSTOR Decommissioning Alternative for the Leningrad Nuclear Power Plant Unit #1

    Energy Technology Data Exchange (ETDEWEB)

    SM Garrett

    1998-09-28

    The objectives of the two joint Russian/U.S. Leningrad Nuclear Power Plant (NPP) Unit #1 studies were the development of a safe, technically feasible, economically acceptable decom missioning strategy, and the preliminary cost evaluation of the developed strategy. The first study, resulting in the decommissioning strategy, was performed in 1996 and 1997. The preliminary cost estimation study, described in this report, was performed in 1997 and 1998. The decommissioning strategy study included the analyses of three basic RBM.K decommission- ing alternatives, refined for the Leningrad NPP Unit #1. The analyses included analysis of the requirements for the planning and preparation as well as the decommissioning phases.

  10. Joint US/Russian study on the development of a decommissioning strategy plan for RBMK-1000 unit No. 1 at the Leningrad Nuclear Power Plant

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-01

    The objective of this joint U.S./Russian study was to develop a safe, technically feasible, economically acceptable strategy for decommissioning Leningrad Nuclear Power Plant (LNPP) Unit No. 1 as a representative first-generation RBMK-1000 reactor. The ultimate goal in developing the decommissioning strategy was to select the most suitable decommissioning alternative and end state, taking into account the socioeconomic conditions, the regulatory environment, and decommissioning experience in Russia. This study was performed by a group of Russian and American experts led by Kurchatov Institute for the Russian efforts and by the Pacific Northwest National Laboratory for the U.S. efforts and for the overall project.

  11. Joint US/Russian study on the development of a decommissioning strategy plan for RBMK-1000 unit No. 1 at the Leningrad Nuclear Power Plant

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-01

    The objective of this joint U.S./Russian study was to develop a safe, technically feasible, economically acceptable strategy for decommissioning Leningrad Nuclear Power Plant (LNPP) Unit No. 1 as a representative first-generation RBMK-1000 reactor. The ultimate goal in developing the decommissioning strategy was to select the most suitable decommissioning alternative and end state, taking into account the socioeconomic conditions, the regulatory environment, and decommissioning experience in Russia. This study was performed by a group of Russian and American experts led by Kurchatov Institute for the Russian efforts and by the Pacific Northwest National Laboratory for the U.S. efforts and for the overall project.

  12. Financing strategies for nuclear power decommissioning

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-07-01

    The report analyzes several alternatives for financing the decommissioning of nuclear power plants from the point of view of assurance, cost, equity, and other criteria. Sensitivity analyses are performed on several important variables and possible impacts on representative companies' rates are discussed and illustrated.

  13. Economic impact associated with the decommissioning process of Vandellos I Nuclear Power Plant; Informe final. Impacto economico del desmantelamiento de la central nuclear Vandellos I

    Energy Technology Data Exchange (ETDEWEB)

    Rodriguez Silva, M.

    2005-07-01

    This economic study examines the economic impact associated with the decommissioning process of the Vandellos I Nuclear Power Plant, measured in terms of the global income that generated the ending of the Nuclear Power Plant activity, on the territory. To this end, we will take into account the total investment that has been necessary to complete the process of decommissioning. The economic impact is calculated using the Input- Output methodology. Briefly, the Input-Output model defines a group of accounting relationships that reflect the links taking place within the production system. The Input-Output model is based on the assumption that given an increase (decrease) in the final demand of one sector, this sector should produce more (less) to satisfy this new demand. At the same time, this will lead to demand more (less) intermediate consumption goods from the remainder sectors of the economy. Then, these sectors should produce more (less) and use more (less) intermediate inputs, and so on. Therefore, an increase (decrease) in the final demand of one sector multiplies the effect throughout the economy, following the interdependency relationships that exist among the productive activities. We will start by collecting an exhaustive economic information. This information covers the whole decommissioning process and the whole economic and productive activity of the province of Tarragona. Next, this information is used with the objective of building an Input-Output table of the province that will serve as a base to establish the global economic impact of Vandellos I. The incomes and employment generation has been evaluated in the province of Tarragona that, following the main assumptions, correspond to the global effects of the decommissioning. In addition, we have evaluated the income and employment generation within the region where the nuclear power plant is located. The total income impacts show a high multiplier effect due to the investment carried out during the

  14. Technology, safety, and costs of decommissioning a reference nuclear fuel reprocessing plant. [Appendices only

    Energy Technology Data Exchange (ETDEWEB)

    Schneider, K.J.; Jenkins, C.E.; Rhoads, R.E.

    1977-09-01

    Volume 2 comprises six appendices on: facility description; residual radioactivity inventory estimates; description and contamination levels of reference site; derivation of residual contamination levels; decommissioning mode detail; and decommissioning safety assessment details.

  15. An archaeology of nuclear power plants. Alternatives to the complete decommissioning of nuclear power plants in Germany

    Energy Technology Data Exchange (ETDEWEB)

    Egermann, Lino [Hochschule Bremen - University of Applied Sciences (Germany)

    2013-07-01

    In this paper, alternatives to the complete dismantling of the nuclear plant buildings are explored through the help of five hypothetical scenarios. The paper does not question the disadvantages or advantages of nuclear energy but instead focuses on the typological and topological particularities of this Technology.

  16. Use of multiscale particle simulations in the design of nuclear plant decommissioning

    Institute of Scientific and Technical Information of China (English)

    Richard A. Williams; Xiao dong Jia; Peter Ikin; David Knight

    2011-01-01

    The application of a digital modelling method that can faithfully take account of three-dimensional shape and inherent physical and chemical properties of each particulate component provides an essential tool in decommissioning design.This is useful in handling of high,medium and low level radioactive waste.The processes involve making decisions on where to cut existing plant components and then how to pack these components into boxes,which are then cemented and kept for long term storage as the level of radioactive declines with time.We illustrate the utility of the method and its ability to take data at plant scale (m-scale) and then deduce behaviours at sub millimetre scale in the packed containers.A variety of modelling approaches are used as a part of this approach including cutting algorithms,geometric and dynamic (distinct element) force models,and lattice Boltzmann methods.These methods are applicable to other complex particulate systems including simulation of waste,building recycling,heap leaching and related minerals processes.The paper introduces the basic concepts of this multi-scale and multi-model approach.

  17. Nuclear decommissioning planning, execution and international experience

    CERN Document Server

    2012-01-01

    A title that critically reviews the decommissioning and decontamination processes and technologies available for rehabilitating sites used for nuclear power generation and civilian nuclear facilities, from fundamental issues and best practices, to procedures and technology, and onto decommissioning and decontamination case studies.$bOnce a nuclear installation has reached the end of its safe and economical operational lifetime, the need for its decommissioning arises. Different strategies can be employed for nuclear decommissioning, based on the evaluation of particular hazards and their attendant risks, as well as on the analysis of costs of clean-up and waste management. This allows for decommissioning either soon after permanent shutdown, or perhaps a long time later, the latter course allowing for radioactivity levels to drop in any activated or contaminated components. It is crucial for clear processes and best practices to be applied in decommissioning such installations and sites, particular where any ...

  18. Plutonium, americium and radiocaesium in the marine environment close to the Vandellos I nuclear power plant before decommissioning

    Energy Technology Data Exchange (ETDEWEB)

    Sanchez-Cabeza, J.A. E-mail: joanalbert.sanchez@uab.es; Molero, J

    2000-11-01

    The Vandellos nuclear power plant (NPP), releasing low-level radioactive liquid waste to the Mediterranean Sea, is the first to be decommissioned in Spain, after an incident which occurred in 1989. The presence, distribution and uptake of various artificial radionuclides (radiocaesium, plutonium and americium) in the environment close to the plant were studied in seawater, bottom sediments and biota, including Posidonia oceanica, fish, crustaceans and molluscs. Seawater, sediments and Posidonia oceanica showed enhanced levels in the close vicinity of the NPP, although the effect was restricted to its near environment. Maximum concentrations in seawater were 11.6{+-}0.5 Bq m{sup -3} and 16.9{+-}1.2 mBq m{sup -3} for {sup 137}Cs and {sup 239,240}Pu, respectively. When sediment concentrations were normalized to excess {sup 210}Pb, they showed both the short-distance transport of artificial radionuclides from the Vandellos plant and the long-distance transport of {sup 137}Cs from the Asco NPP. Posidonia oceanica showed the presence of various gamma-emitters attributed to the impact of the Chernobyl accident, on which the effect of the NPP was superimposed. Seawater, sediment and Posidonia oceanica collected near the plant also showed an enhancement of the plutonium isotopic ratio above the fallout value. The uptake of these radionuclides by marine organisms was detectable but limited. Pelagic fish showed relatively higher {sup 137}Cs concentrations and only in the case of demersal fish was the plutonium isotopic ratio increased. The reported levels constitute a set of baseline values against which the impact of the decommissioning operations of the Vandellos I NPP can be studied.

  19. Decontamination and decommissioning project for the nuclear facilities

    Energy Technology Data Exchange (ETDEWEB)

    Park, J. H.; Paik, S. T.; Park, S. W. (and others)

    2007-02-15

    The final goal of this project is to complete the decommissioning of the Korean Research Reactor no.1 and no. 2(KRR-1 and 2) and uranium conversion plant safely and successfully. The goal of this project in 2006 is to complete the decontamination of the inside reactor hall of the KRR-2 which will be operating as a temporary storage for the radioactive waste until the construction and operation of the national repository site. Also the decommissioning work of the KRR-1 and auxiliary facilities is being progress. As the compaction of decommissioning project is near at hand, a computer information system was developed for a systematically control and preserve a technical experience and decommissioning data for the future reuse. The nuclear facility decommissioning, which is the first challenge in Korea, is being closed to the final stages. We completed the decommissioning of all the bio-shielding concrete for KRR-2 in 2005 and carried out the decontamination and waste material grouping of the roof, wall and bottom of the reactor hall of the KRR-2. The decommissioning for nuclear facility were demanded the high technology, remote control equipment and radioactivity analysis. So developed equipment and experience will be applied at the decommissioning for new nuclear facility in the future.

  20. Power Plant decommissioning

    Directory of Open Access Journals (Sweden)

    Mažeika Jonas

    2014-11-01

    Full Text Available On a first attempt, the determination of 14C and 36Cl activity concentrations in basic operational waste (spent ion-exchange resins and perlite mixture, in decommissioning waste (construction concrete, sand, stainless steel and serpentinite and irradiated graphite from the Ignalina NPP has been performed. The samples for measurement of the specific activity of 14C and 36Cl were obtained from the selected places, where the highest values of the dose rate and the activity concentrations of gamma emitters were found. The performed study of the total 14C and 36Cl activity concentrations was based on estimated chemical forms of 14C (inorganic and organic compounds and 36Cl as Cl- ion. The tested methods used in this study were found to be suitable for estimation of activity concentrations of measured radionuclides.

  1. ''Rueckbau 2014''. KWS Congress regarding decommissioning and dismantling at Zwentendorf nuclear training power plant; ''Rueckbau 2014''. KWS-Rueckbau-Fachtagung im Schulungskernkraftwerk Zwentendorf

    Energy Technology Data Exchange (ETDEWEB)

    Maassen, Herbert [KRAFTWERKSSCHULE E.V. (KWS), Essen (Germany)

    2015-06-01

    From September 24 to 25, 2014, KRAFTWERKS-SCHULE E.V. (KWS) held the congress ''Rueckbau 2014''.This first congress about nuclear power plant decommissioning was combined with an exhibition in the fully equipped Zwentendorf nuclear training power plant. The exhibitors had the opportunity to present and test their products in the ambience of a real nuclear power plant, close to original plant components. The visitors got a general overview of the on-site conditions. During the lectures the process of decommissioning and dismantling of a nuclear power plant were described, problems within this process were discussed, and possible solutions were recommended.

  2. The SSI project on decommissioning of nuclear plants - a preliminary study; SSI:s projekt avseende avveckling av kaerntekniska anlaeggningar - en foerstudie

    Energy Technology Data Exchange (ETDEWEB)

    Efraimsson, Henrik; Ehdwall, H.; Godaas, T.; Hofvander, P.; Lindhe, J.C.; Lumpus, J.; Lund, I.; Malmqvist, L.; Welleman, E

    1999-01-01

    SSI will amend and complete regulations and stipulations for nuclear plants in order to take into account issues which arise in connection with decommissioning. The objective of a pilot study, performed during 1998, was to identify the questions at issue, what the authority should control and how SSI should proceed with the work. The recommendations and the result of the pilot study are presented in this report 29 refs.

  3. Dismantling and decommissioning of Jose Cabrera nuclear power plant; El desmantelamiento y clausura de la central nuclear Jose Cabrera

    Energy Technology Data Exchange (ETDEWEB)

    Rodriguez, A.

    2009-07-01

    With the start of the dismantling works at the Jose Cabrera nuclear power plant now in sight, this is an appropriate moment to look back and consider recent history. The first time that the issue of nuclear power plant dismantling was dealt with was in 1975, at a conference in Paris entitled Nuclear Energy Maturity. Up until then the entire question had been one of design, construction and operation, but since that moment and it has been quite a while since that conference dismantling has begun to be seen as just another activity in the nuclear cycle, a final activity that will sooner or later affect all the facilities, an activity different from its predecessors and with the ultimate objective of restoring the sites for whatever use might be determined. During the 1960's and 1970's, the construction of nuclear power plants was widespread across the entire world. It was the baby boom of nuclear energy and now, forty or fifty years later, we are seeing the arrival of the end of the service lifetime of these plants and are faced with the corresponding general process of dismantling these installations. The dismantling of nuclear power plants has ceased to be an emerging issue and is now consolidated as a regular activity in the nuclear industry, albeit an activity that lacks adequate financing or specific regulation in certain countries. Fortunately this is not the case in Spain, since economic provisions have been planned and the regulatory framework developed. In view of the above, the dismantling of the nuclear power plants is an industrial activity involving specific technologies that implies new professional and business opportunities that should be absorbed and seized by society. In Spain the path followed in this direction has been a long one, as is underlined by the experiences of dismantling the Argos (Barcelona, 1998- 2004) and Arbi (Bilbao, 2002-2005) research reactors, the Andujar Uranium Mill (Jaen, 1991-1995), the Vandellos I nuclear power

  4. Accidental safety analysis methodology development in decommission of the nuclear facility

    Energy Technology Data Exchange (ETDEWEB)

    Park, G. H.; Hwang, J. H.; Jae, M. S.; Seong, J. H.; Shin, S. H.; Cheong, S. J.; Pae, J. H.; Ang, G. R.; Lee, J. U. [Seoul National Univ., Seoul (Korea, Republic of)

    2002-03-15

    Decontamination and Decommissioning (D and D) of a nuclear reactor cost about 20% of construction expense and production of nuclear wastes during decommissioning makes environmental issues. Decommissioning of a nuclear reactor in Korea is in a just beginning stage, lacking clear standards and regulations for decommissioning. This work accident safety analysis in decommissioning of the nuclear facility can be a solid ground for the standards and regulations. For source term analysis for Kori-1 reactor vessel, MCNP/ORIGEN calculation methodology was applied. The activity of each important nuclide in the vessel was estimated at a time after 2008, the year Kori-1 plant is supposed to be decommissioned. And a methodology for risk analysis assessment in decommissioning was developed.

  5. Decontamination and Decommissioning Project for the Nuclear Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Park, J. H.; Paik, S. T.; Park, S. W. and others

    2006-02-15

    The final goal of this project is to complete safely and successfully the decommissioning of the Korean Research Reactor no.1 (KRR-1) and the Korean Research Reactor no.2 (KRR-2), and uranium conversion plant (UCP). The dismantling of the reactor hall of the KRR-2 was planned to complete till the end of 2004, but it was delayed because of a few unexpected factors such as the development of a remotely operated equipment for dismantling of the highly radioactive parts of the beam port tubes. In 2005, the dismantling of the bio-shielding concrete structure of the KRR-2 was finished and the hall can be used as a temporary storage space for the radioactive waste generated during the decommissioning of the KRR-1 and KRR-2. The cutting experience of the shielding concrete by diamond wire saw and the drilling experience by a core boring machine will be applied to another nuclear facility dismantling. An effective management tool of the decommissioning projects, named DECOMIS, was developed and the data from the decommissioning projects were gathered. This system provided many information on the daily D and D works, waste generation, radiation dose, etc., so an effective management of the decommissioning projects is expected from next year. The operation experience of the uranium conversion plant as a nuclear fuel cycle facility was much contributed to the localization of nuclear fuels for both HWR and PWR. It was shut down in 1993 and a program for its decontamination and dismantling was launched in 2001 to remove all the contaminated equipment and to achieve the environment restoration. The decommissioning project is expected to contribute to the development of the D and D technologies for the other domestic fuel cycle facilities and the settlement of the new criteria for decommissioning of the fuel cycle related facilities.

  6. The planning of decommissioning activities within nuclear facilities - Generating a Baseline Decommissioning Plan

    Energy Technology Data Exchange (ETDEWEB)

    Meek, N.C.; Ingram, S.; Page, J. [BNFL Environmental Services (United Kingdom)

    2003-07-01

    BNFL Environmental Services has developed planning tools to meet the emerging need for nuclear liabilities management and decommissioning engineering both in the UK and globally. It can provide a comprehensive baseline planning service primarily aimed at nuclear power stations and nuclear plant. The paper develops the following issues: Decommissioning planning; The baseline decommissioning plan;The process; Work package; Compiling the information; Deliverables summary; Customer Benefits; - Planning tool for nuclear liability life-cycle management; - Robust and reliable plans based upon 'real' experience; - Advanced financial planning; - Ascertaining risk; - Strategy and business planning. The following Deliverables are mentioned:1. Site Work Breakdown Structure; 2. Development of site implementation strategy from the high level decommissioning strategy; 3. An end point definition for the site; 4. Buildings, operational systems and plant surveys; 5. A schedule of condition for the site; 6. Development of technical approach for decommissioning for each work package; 7. Cost estimate to WBS level 5 for each work package; 8. Estimate of decommissioning waste arisings for each work package; 9. Preparation of complete decommissioning programme in planning software to suit client; 10. Risk modelling of work package and overall project levels; 11. Roll up of costs into an overall cost model; 12. Cash flow, waste profiling and resource profiling against the decommissioning programme; 13. Preparation and issue of Final Report. Finally The BDP process is represented by a flowchart listing the following stages: [Power Station project assigned] {yields} [Review project and conduct Characterisation review of power station] {yields} [Identify work packages] {yields} [Set up WBS to level 3] {yields} [Assign work packages] {yields} [Update WBS to level 4] {yields}[Develop cost model] {yields} [Develop logic network] {yields} [Develop risk management procedure] ] {yields

  7. Atmospheric discharges from nuclear facilities during decommissioning: German experiences

    Energy Technology Data Exchange (ETDEWEB)

    Braun, H.; Goertz, R.; Weil, L.

    1997-08-01

    In Germany, a substantial amount of experience is available with planning, licensing and realization of decommissioning projects. In total, a number of 18 nuclear power plants including prototype facilities as well as 6 research reactors and 3 fuel cycle facilities have been shut down finally and are at different stages of decommissioning. Only recently the final {open_quotes}green field{close_quotes} stage of the Niederaichbach Nuclear Power Plant total dismantlement project has been achieved. From the regulatory point of view, a survey of the decommissioning experience in Germany is presented highlighting the aspects of production and retention of airborne radioactivity. Nuclear air cleaning technology, discharge limits prescribed in licences and actual discharges are presented. As compared to operation, the composition of the discharged radioactivity is different as well as the off-gas discharge rate. In practically all cases, there is no significant amount of short-lived radionuclides. The discussion further includes lessons learned, for example inadvertent discharges of radionuclides expected not to be in the plants inventory. It is demonstrated that, as for operation of nuclear power plants, the limits prescribed in the Ordinance on Radiological Protection can be met using existing air cleaning technology, Optimization of protection results in public exposures substantially below the limits. In the frame of the regulatory investigation programme a study has been conducted to assess the airborne radioactivity created during certain decommissioning activities like decontamination, segmentation and handling of contaminated or activated parts. The essential results of this study are presented, which are supposed to support planning for decommissioning, for LWRs, Co-60 and Cs-137 are expected to be the dominant radionuclides in airborne discharges. 18 refs., 2 figs., 1 tab.

  8. International measures for supporting the Ukraine in decommissioning Chernobyl nuclear power plant; Internationale Massnahmen zur Unterstuetzung der Ukraine bei der Stilllegung des KKW Tschernobyl

    Energy Technology Data Exchange (ETDEWEB)

    Wolf, J.

    2006-07-01

    The destruction of Block 4 of the Ukranian nuclear power plant in Chernobyl on 26 April 1986 was the largest and most momentous accident in the civil use of nuclear energy. Its far-reaching and lasting ecological, heath-related and economic effects confronted the then Soviet and later the Ukraine with grave problems. Particularly after the dissolution of the Eastern Bloc and the emergence of information about the safety shortcomings of RBMK-type (Chernobyl-type) reactors the Western states pressed for the decommissioning of these reactors. At the G7 summit in Naples in 1994 the Ukraine was offered an action plan of support if it were willing to close down Chernobyl nuclear power plant. This initiative led to the signing on 20 December 1995 of a Memorandum of Understanding on the Closure of Chernobyl Nuclear Power Plant between the G7 states, the European Commission and the Ukraine. It contained an assurance by President Kuchma that Chernobyl nuclear power plant would be closed by the year 2000.

  9. Quality Assurance in the Vandellos 1 Nuclear Power Plant Dismantling and Decommissioning Project; La garantia de calidad en el proyecto de desmantelamiento y clausura de la Central Nuclear de Vandellos I

    Energy Technology Data Exchange (ETDEWEB)

    Soto Lanuza, A.

    2000-07-01

    General description of the Quality Assurance System established and implemented for the efficient development of the current activities specified in the Dismantling and Decommissioning Plan for Vandellos I Nuclear Power Plant. Aspects related to the Quality organization, scope and applicability on the established Quality Assurance Manual, availability of requirements and recommendations on quality as well as actions to be taken for the correct verification on the quality and practical application of the Manual should be described. (Author)

  10. Solid Waste from the Operation and Decommissioning of Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Brown, Marilyn Ann [Georgia Inst. of Technology, Atlanta, GA (United States); D' Arcy, Daniel [Georgia Inst. of Technology, Atlanta, GA (United States); Lapsa, Melissa Voss [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Sharma, Isha [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Li, Yufei [Georgia Inst. of Technology, Atlanta, GA (United States)

    2017-01-05

    This baseline report examines the solid waste generated by the U.S. electric power industry, including both waste streams resulting from electricity generation and wastes resulting from the decommissioning of power plants. Coal and nuclear plants produce large volumes of waste during electricity generation, and this report describes the policies and procedures for handling these materials. Natural gas and oil-fired power plants face similar waste challenges. Renewables considered in this baseline report include hydropower, wind and solar.

  11. Unrestricted re-use of decommissioned nuclear laboratories

    Energy Technology Data Exchange (ETDEWEB)

    Cornelissen, R.; Noynaert, L.; Harnie, S.; Marien, J.

    1996-09-18

    A decommissioning strategy was developed by the Belgian Nuclear Research Centre SCK/CEN. In this strategy decommissioning works are limited to the radioactive parts of the nuclear installation. After obtaining an attestation for unrestricted reuse of the building after removal of all radioactivity, the building can be used for new industrial purposes outside the nuclear field. The decommissioning activities according to this strategy have been applied in four buildings. The results are described.

  12. CEA decommissioning strategy and program for nuclear facilities

    Energy Technology Data Exchange (ETDEWEB)

    Pochon, E.; Cerdan, G. [Legacy and Clean-up Directorate, Nuclear Energy Division, French Atomic Energy Commission, CEA/Siege, 31-33, rue de la Federation, 75752 Paris cedex 15 (France)

    2003-07-01

    The CEA's experience of the decommissioning of nuclear facilities goes back many decades and relates to many installations of very different types. The first substantial operations began in the sixties and seventies, and included, for instance, the first plutonium plant at Fontenay-aux-Roses (total decommissioning) and a number of small research reactors and critical mock-ups such as Cesar and Peggy at Cadarache, and Minerve at Fontenay-aux-Roses. Some twenty facilities were dealt with by 2000, corresponding to around half of all the nuclear facilities permanently closed, beginning with the decommissioning of facility AT1 at La Hague, the pilot plant used by the CEA in the seventies for the reprocessing of spent fuel from fast neutron reactors in March 2001 and ending with the demolition of the G1 stack at Marcoule, on 19 July this year. During the nineties, decommissioning was scaled back and few of the operations in progress were completed. The end of the decade saw a slowdown which was a consequence of financial difficulties, as the CEA had not yet set aside sufficient funds to cover the work, even though, between 1993 and 1999, part of the necessary resources had been provided under an agreement with the industrial partners EDF and Cogema. At the present time, the situation is rapidly improving both as concerns organisational and financial issues for the CEA and as concerns the regulations and the management of waste for all the organisations involved. First of all, for the different problems associated with radioactive clean-up faced by its research centres, the efforts made by the CEA in the field of organisation and planning since the beginning of the nineties have led to the drawing up of an overall multi-year plan referred to as the 'CEA civil centre radioactive clean-up plan' and the appointment of the Legacy and Clean-up Directorate to act as the client and be in charge of application of the plan relating not only to decommissioning of the

  13. Challenges in Cost Estimation under Uncertainty—A Case Study of the Decommissioning of Barsebäck Nuclear Power Plant

    Directory of Open Access Journals (Sweden)

    Olav Torp

    2016-10-01

    Full Text Available Cost estimation is an important part of project planning. Over the years different approaches have developed, taking uncertainty into account in the cost estimation processes in order to tackle the dynamic nature of projects. However, when implementing these approaches, some challenges have been revealed. The aim in a cost estimation process is to establish a realistic overview of the total project costs and its uncertainties. Even though tools and methods for taking uncertainty into account are implemented, projects with cost overruns are often seen. In this paper we look into some challenges with the practice in cost estimation processes and identify possible improvements to overcome them. The purpose of this paper is to illustrate better solutions to some of the major weaknesses identified in current cost estimation practice. We use a case study of decommissioning of Barsebäck Nuclear Power Plant to illustrate how to overcome these challenges. First of all, this is an interesting case with challenges related to the project and the cost estimation process, given the complexity in the situation and that very few have experiences related to decommission of nuclear power plants. Second, we applied an approach that is not yet commonly used to develop cost estimates for this kind of projects. The paper concludes that it is possible to improve the results of uncertainty analysis of cost estimates. A well prepared process, with a suitable group of experts that go through a well-structured process, focusing both on risks and opportunities and using a top-down approach can compensate for some of the challenges related to cost estimation under uncertainty.

  14. Nuclear facility decommissioning and site remedial actions

    Energy Technology Data Exchange (ETDEWEB)

    Owen, P.T.; Knox, N.P.; Ferguson, S.D.; Fielden, J.M.; Schumann, P.L.

    1989-09-01

    The 576 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the tenth in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Citations to foreign and domestic literature of all types--technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions--have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's Remedial Action Programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) General Remedial Action Program Studies. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title work, publication description, geographic location, subject category, and keywords.

  15. Nuclear facility decommissioning and site remedial actions

    Energy Technology Data Exchange (ETDEWEB)

    Knox, N.P.; Webb, J.R.; Ferguson, S.D.; Goins, L.F.; Owen, P.T.

    1990-09-01

    The 394 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the eleventh in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's Remedial Action Programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Programs, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Grand Junction Remedial Action Program, (7) Uranium Mill Tailings Management, (8) Technical Measurements Center, (9) Remedial Action Program, and (10) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and keywords. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects and analyzes information on remedial actions and relevant radioactive waste management technologies.

  16. Systematization of nuclear fuel facility decommissioning technology

    Energy Technology Data Exchange (ETDEWEB)

    Sugitsue, Noritake [Japan Nuclear Cycle Development Inst., Ningyo Toge Environmental Engineering Center, Kamisaibara, Okayama (Japan)

    2001-09-01

    In the Ningyo-Toge Environmental Engineering Center, the nature of all decommissioning works is clarified and, as an information base for planning the promotion of efficiency of a work, the Decommissioning Engineering System is being developed. The Decommissioning Engineering System consists of a function for performing work support for a decommissioning, a function for gathering information results of the decommissioning technology and a general evaluation function for the decommissioning plan on the basis of facilities information collected by three-dimensional CAD. (author)

  17. Good practices in decommissioning planning and pre-decommissioning activities for the Magurele VVR-S nuclear research reactor

    OpenAIRE

    Dragusin Mitica; Pavelescu Octavian Alexandru; Iorga Ioan

    2011-01-01

    The VVR-S Nuclear Research Reactor at the “Horia Hulubei” National Institute of Physics and Nuclear Engineering in Magurele, Bucharest, will be decommissioned applying the immediate dismantling strategy. The implementation of the decommissioning project started in 2010 and is planned for completion within 11 years. Good practices in decommissioning planning, organization, funding, and logistics are described in this paper.

  18. The role of the IAEA in international guidance and assistance on decommissioning of small nuclear facilities

    Energy Technology Data Exchange (ETDEWEB)

    Laraia, M., E-mail: m.laraia@iaea.or [IAEA, Wagramerstrasse 5, A-1400 Vienna (Austria)

    2010-10-15

    The IAEA has included decommissioning in its regular programmes since the early 1970 decade. Since 1985, decommissioning has been considered as a separate programme within the IAEA. Decommissioning has become a topic of great interest to many countries because of the large number of facilities that have reached or are nearing the end of their operating lifetime. Until recently, attention was focused on the decommissioning of nuclear power plants, and to less extent, other large nuclear facilities like nuclear fuel cycle facilities. Quite a few countries, however, are now being faced with the decommissioning of research reactors and other small non-reactor facilities, which are prevailing in most of our Member States. This factor demands equal attention in IAEA programmes. Not unlike IAEA publications, most of existing technical literature on decommissioning addresses technological and other aspects in decontamination and dismantling of large nuclear facilities. It should however be noted that most nuclear facilities are smaller -in size and complexity- and may present a lower radiological risk in decommissioning than the larger facilities. Such facilities e.g. small research reactors, critical assemblies, biological and medical laboratories, factories manufacturing radioactive products etc. are often located in countries where decommissioning experience and related resources are often limited. The risk here is that even minimum requirements and strategies be disregarded in decommissioning of these facilities resulting in unnecessary costs, delays, and possible safety concerns in the course of decontamination and dismantling activities. Besides, guidance on decommissioning of larger facilities can be misleading for smaller facilities. This paper provides an update on current and foreseen IAEA activities in the field of decommissioning of small nuclear facilities. Most IAEA activities can be included into the following two categories: drafting technical and safety

  19. On Younger Stakeholders and Decommissioning of Nuclear Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Tyszkiewicz, Bogumila; Labor, Bea

    2009-08-15

    based on a proper understanding of the values and value functions of younger citizens. Such information must thus be an integral part of the knowledge base to be used when plans and processes are being developed for dismantling and decommissioning of nuclear power plants and other older nuclear facilities. In the present project, empirical data have been collected and compiled in a survey of the values of younger citizens with regard to decommissioning and dismantling of older nuclear facilities. The survey constitutes a stratified sample from three towns in Poland. They are Lublin, Olsztyn and Gdansk. A total of 780 students in the age group 14-19 years participated in the Survey. The results are compared to those from a similar study in the County of Kalmar in Sweden in the year 2006. The results include some major lesson learned. These may be summarised as follows: - Younger citizens tend to base their values regarding decommissioning on safety, and environmental aspects. Aspects like future economic growth and technological processes are less influential on the values. - Younger citizens tend to express a lack of information and debate as a basis of their value functions. Likewise, they tend to express interest in the topic and are open to become more included in the processes. - Younger citizens have suggestions on how more information can be made accessible to the general public. - Younger citizens need to be better included in the stakeholder process. This can be achieved by allowances from the Swedish Nuclear Waste Fund to support groups of younger citizens to follow the Swedish process of research, development and demonstration of a concept for the management of spent nuclear fuel. Less than fully accessible information campaigns about nuclear power and associated nuclear waste may result in differences in confidence levels between different groups of stakeholders. By finding out more about the values of different stakeholders it will be possible for the

  20. ''Rueckbau 2014''. KWS congress regarding decommissioning and dismantling at nuclear training power plant Zwentendorf; ''Rueckbau 2014''. KWS-Rueckbau-Fachtagung im Schulungskernkraftwerk Zwentendorf

    Energy Technology Data Exchange (ETDEWEB)

    Maassen, Herbert [KRAFTWERKSSCHULE e.V. (KWS), Essen (Germany)

    2015-05-15

    From September 24th to 25th, 2014 the KRAFTWERKSSCHULE E.V. (KWS) held the congress ''Rueckbau 2014''. This first congress about the deconstruction of nuclear power plants was combined with an exhibition in the fully equipped nuclear training power plant Zwentendorf. The exhibitors had the opportunity to present and test their products in the ambience of a real nuclear power plant, close to original plant components. The visitors got a general overview of the on-site conditions. During the lectures the process of decommissioning and dismantling of a nuclear power plant was described, problems within this process were discussed, and possible solutions were recommended. The congress influenced significantly the dialogue of all parties involved and contributed to an extensive exchange of knowledge and experience.

  1. Technology, safety, and costs of decommissioning reference nuclear research and test reactors: sensitivity of decommissioning radiation exposure and costs to selected parameters

    Energy Technology Data Exchange (ETDEWEB)

    Konzek, G.J.

    1983-07-01

    Additional analyses of decommissioning at the reference research and test (R and T) reactors and analyses of five recent reactor decommissionings are made that examine some parameters not covered in the initial study report (NUREG/CR-1756). The parameters examined for decommissioning are: (1) the effect on costs and radiation exposure of plant size and/or type; (2) the effects on costs of increasing disposal charges and of unavailability of waste disposal capacity at licensed waste disposal facilities; and (3) the costs of and the available alternatives for the disposal of nuclear R and T reactor fuel assemblies.

  2. On Younger Stakeholders and Decommissioning of Nuclear Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Tyszkiewicz, Bogumila; Labor, Bea

    2009-08-15

    based on a proper understanding of the values and value functions of younger citizens. Such information must thus be an integral part of the knowledge base to be used when plans and processes are being developed for dismantling and decommissioning of nuclear power plants and other older nuclear facilities. In the present project, empirical data have been collected and compiled in a survey of the values of younger citizens with regard to decommissioning and dismantling of older nuclear facilities. The survey constitutes a stratified sample from three towns in Poland. They are Lublin, Olsztyn and Gdansk. A total of 780 students in the age group 14-19 years participated in the Survey. The results are compared to those from a similar study in the County of Kalmar in Sweden in the year 2006. The results include some major lesson learned. These may be summarised as follows: - Younger citizens tend to base their values regarding decommissioning on safety, and environmental aspects. Aspects like future economic growth and technological processes are less influential on the values. - Younger citizens tend to express a lack of information and debate as a basis of their value functions. Likewise, they tend to express interest in the topic and are open to become more included in the processes. - Younger citizens have suggestions on how more information can be made accessible to the general public. - Younger citizens need to be better included in the stakeholder process. This can be achieved by allowances from the Swedish Nuclear Waste Fund to support groups of younger citizens to follow the Swedish process of research, development and demonstration of a concept for the management of spent nuclear fuel. Less than fully accessible information campaigns about nuclear power and associated nuclear waste may result in differences in confidence levels between different groups of stakeholders. By finding out more about the values of different stakeholders it will be possible for the

  3. Decommissioning of the BR3 PWR[1997 Scientific Report of the Belgian Nuclear Research Centre

    Energy Technology Data Exchange (ETDEWEB)

    Massaut, V.

    1998-07-01

    The dismantling and the decommissioning of nuclear installations at the end of their life-cycle is a new challenge to the nuclear industry. Different techniques and procedures for the dismantling of a nuclear power plant on an existing installation, the BR-3 pressurized-water reactor, are described. The scientific program, objectives, achievements in this research area at the Belgian Nuclear Research Centre SCK-CEN for 1997 are summarized.

  4. Decontamination and Decommissioned Small Nuclear AIP Hybrid Systems Submarines

    Directory of Open Access Journals (Sweden)

    Guangya Liu

    2013-11-01

    Full Text Available Being equipped with small reactor AIP is the trend of conventional submarine power in 21st century as well as a real power revolution in conventional submarine. Thus, the quantity of small reactor AIP Submarines is on the increase, and its decommissioning and decontamination will also become a significant international issue. However, decommissioning the small reactor AIP submarines is not only a problem that appears beyond the lifetime of the small reactor nuclear devices, but the problem involving the entire process of design, construction, running and closure. In the paper, the problem is explored based on the conception and the feasible decommissioning and decontamination means are supplied to choose from.

  5. Standard Guide for Preparing Characterization Plans for Decommissioning Nuclear Facilities

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    2009-01-01

    1.1 This standard guide applies to developing nuclear facility characterization plans to define the type, magnitude, location, and extent of radiological and chemical contamination within the facility to allow decommissioning planning. This guide amplifies guidance regarding facility characterization indicated in ASTM Standard E 1281 on Nuclear Facility Decommissioning Plans. This guide does not address the methodology necessary to release a facility or site for unconditional use. This guide specifically addresses: 1.1.1 the data quality objective for characterization as an initial step in decommissioning planning. 1.1.2 sampling methods, 1.1.3 the logic involved (statistical design) to ensure adequate characterization for decommissioning purposes; and 1.1.4 essential documentation of the characterization information. 1.2 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate saf...

  6. In Situ Decommissioning (ISD) Concepts and Approaches for Excess Nuclear Facilities Decommissioning End State - 13367

    Energy Technology Data Exchange (ETDEWEB)

    Serrato, Michael G. [Savannah River National Laboratory, Savannah River Nuclear Solutions, Aiken, SC 29808 (United States); Musall, John C.; Bergren, Christopher L. [Savannah River Nuclear Solutions, Aiken, SC 29808 (United States)

    2013-07-01

    The United States Department of Energy (DOE) currently has numerous radiologically contaminated excess nuclear facilities waiting decommissioning throughout the Complex. The traditional decommissioning end state is complete removal. This commonly involves demolishing the facility, often segregating various components and building materials and disposing of the highly contaminated, massive structures containing tons of highly contaminated equipment and piping in a (controlled and approved) landfill, at times hundreds of miles from the facility location. Traditional demolition is costly, and results in significant risks to workers, as well as risks and costs associated with transporting the materials to a disposal site. In situ decommissioning (ISD or entombment) is a viable alternative to demolition, offering comparable and potentially more protective protection of human health and the environment, but at a significantly reduced cost and worker risk. The Savannah River Site (SRS) has completed the initial ISD deployment for radiologically contaminated facilities. Two reactor (P and R Reactors) facilities were decommissioned in 2011 using the ISD approach through the American Recovery and Reinvestment Act. The SRS ISD approach resolved programmatic, regulatory and technical/engineering issues associated with avoiding the potential hazards and cost associated with generating and disposing of an estimated 124,300 metric tons (153,000 m{sup 3}) of contaminated debris per reactor. The DOE Environmental Management Office of Deactivation and Decommissioning and Facility Engineering, through the Savannah River National Laboratory, is currently investigating potential monitoring techniques and strategies to assess ISD effectiveness. As part of SRS's strategic planning, the site is seeking to leverage in situ decommissioning concepts, approaches and facilities to conduct research, design end states, and assist in regulatory interactions in broad national and

  7. Reserves for nuclear power plant decommissioning and radwaste disposal in Germany. An analysis and evaluation from the angle of energy policy. Energiewirtschaftliche Bewertung der Rueckstellungen fuer die Entsorgung der deutschen Kernkraftwerke

    Energy Technology Data Exchange (ETDEWEB)

    Buerger, V. (comp.)

    1998-01-01

    The study, which is the first of its kind in Germany, presents a comprehensive survey of total reserves set up by the German nuclear industry for liabilities and costs for nuclear power plant decommissioning and resulting radwaste disposal, which is a legal and foreseeable responsibility but uncertain in amount. The study looks into the various ways the earmarked money was invested and analyses the funds with respect to their efficiency and reliability to provide financial security for the given tasks and purpose. The question put in this context is: Are the reserves set up so far in line with official cost estimates, i.e. will they cover estimated costs, or do they even exceed the estimated amounts The conclusions drawn and explained in this document are: The reserves for nuclear decommissioning have been used by the nuclear power plant operators and electricity companies as a significant capital source. Some of the capital accrued is being increasingly used at present to cover expenses arising for restructuring of business and diversification into new business segments of interest in the open national and European electricity markets. Companies such as RWE, Preussen Elektra, and Bayernwerk, which until deregulation of the energy sector were just power supply companies, have been transformed into conglomerate companies and international players in the markets, like RWE Holding, VEBA, and VIAG. It can be safely assumed that the companies would not have been able to reach the important positions they currently hold in the German economy without tapping the reserves for nuclear decommissioning. (orig./CB) 27 refs.

  8. The application of mature dry storage technology and remote handling robotics to nuclear plant extension, clean-up and decommissioning

    Energy Technology Data Exchange (ETDEWEB)

    Blackwell, W.C. [GEC ALSTHOM Engineering Systems Ltd., Leicester (United Kingdom)

    1997-08-01

    This paper reviews a mature dry storage technology developed by GEC ALSTHOM Engineering Systems Limited (GAES) which offers a passive, economical and licensable method of providing irradiated fuel storage capacity at operational nuclear power stations. The evolution of the modular vault dry store (MVDS) technology has taken place over 25 years of operational experience, culminating in a product which meets all of the concerns of licensing authorities regarding safety and fuel integrity. The application of remote handling robotics to nuclear fuel and active component handling as a routine process rather than as an intervention technique is also reviewed. The growth of the application of this technology is governed by several factors which include: statutory requirements, safety assurance, risk reduction and economic pressures. The availability of a mature MVDS technology with an evolving process-capable robotics technology opens up opportunities for exploring proven UK products. (Author).

  9. 75 FR 80697 - Nuclear Decommissioning Funds

    Science.gov (United States)

    2010-12-23

    ... collection of information unless the collection of information displays a valid OMB control number. Books or... books on the asset. Section 1.468A- 8T(b)(3)(ii) of the temporary regulations provides that, in the case... connection with the preparation for decommissioning, such as engineering and other planning expenses, and...

  10. CONSIDERATIONS FOR THE DEVELOPMENT OF A DEVICE FOR THE DECOMMISSIONING OF THE HORIZONTAL FUEL CHANNELS IN THE CANDU 6 NUCLEAR REACTOR PART 5 - FUEL CHANEL DECOMMISSIONING

    Directory of Open Access Journals (Sweden)

    Gabi ROSCA FARTAT

    2014-05-01

    Full Text Available As many nuclear power plants are reaching their end of lifecycle, the decommissioning of these installations has become one of the 21st century’s great challenges. Each project may be managed differently, depending on the country, development policies, financial considerations, and the availability of qualified engineers or specialized companies to handle such projects. The principle objective of decommissioning is to place a facility into such a condition that there is no unacceptable risk from the decommissioned facility to public health and safety of the environment. In order to ensure that at the end of its life the risk from a facility is within acceptable bounds, action is normally required. The overall decommissioning strategy is to deliver a timely, cost-effective program while maintaining high standards of safety, security and environmental protection. If facilities were not decommissioned, they could degrade and potentially present an environmental radiological hazard in the future. Simply abandoning or leaving a facility after ceasing operations is not considered to be an acceptable alternative to decommissioning. The final aim of decommissioning is to recover the geographic site to its original condition.

  11. DECOMMISSIONING OF NUCLEAR FACILITIES IN GERMANY - STATUS AT BMBF SITES

    Energy Technology Data Exchange (ETDEWEB)

    Papp, R.; Komorowski, K.

    2002-02-25

    In a period of approximately 40 years prior to 1994, the German Federal Government had spent about {approx} 15 billion to promote nuclear technology. These funds were earmarked for R&D projects as well as demonstration facilities which took up operation between 1960 and 1980. These BMBF (Federal Ministry for Research) facilities were mainly located at the sites of the federal research centers at Juelich and Karlsruhe (the research reactors AVR, FR2, FRJ-1, KNK, and MZFR, the pilot reprocessing plant WAK) but included also the pilot plants SNR-300 and THTR-300 for fast breeder and high-temperature gas-cooled reactor development, respectively, and finally the salt mine Asse which had been used for waste emplacement prior to conversion into an underground research laboratory. In the meantime, almost all of these facilities were shut down and are now in a state of decommissioning and dismantling. This is mainly due to the facts that R&D needs are satisfied or do not exist any more and that, secondly, the lack of political consensus led to the cancellation of advanced nuclear technology.

  12. Establishment and Evaluation of Decommissioning Plant Inventory DB and Waste Quantity

    Energy Technology Data Exchange (ETDEWEB)

    Oh, Jae Yong; Moon, Sang-Rae; Yun, Taesik; Kim, Hee-Geun [KHNP CRI, Daejeon (Korea, Republic of); Sung, Nak-Hoon; Jung, Seung Hyuk [KONES Corp., Seoul (Korea, Republic of)

    2016-10-15

    Korea Hydro and Nuclear Power (KHNP) made a decision for permanent shutdown of Kori-1 and has progressed the strategy determination and R and D for the decommissioning of Kori-1. Decommissioning waste, Structure, System and Components (SSCs) is one of the most important elements. Decommissioning waste quantity is calculated based on Plant Inventory Database (PI DB) with activation and contamination data. Due to the largest portion of waste management and disposal in decommissioning, it is necessary to exactly evaluate waste quantity (applying the regulation, guideline and site-specific characterization) for economic feasibility. In this paper, construction of PI DB and evaluation of waste quantity for Optimized Pressurized Reactor (OPR-1000) are mainly described. Decommissioning waste quantities evaluated are going to be applied to calculation of the project cost. In fact, Ministry of Trade, Industry and Energy (MOTIE) in Korea expected the decommissioning waste quantity in a range of 14,500-18,850 drums, and predicted appropriate liability for decommissioning fund by using waste quantity. The result of this study is also computed by the range of 14,500-18,850 drums. Since there is no site-specific data for the NPP site, this evaluation is the preliminary analysis.

  13. Cost calculations for decommissioning and dismantling of nuclear research facilities

    Energy Technology Data Exchange (ETDEWEB)

    Andersson, I. (Studsvik Nuclear AB (Sweden)); Backe, S. (Institute for Energy Technology (Norway)); Cato, A.; Lindskog, S. (Swedish Nuclear Power Inspectorate (Sweden)); Efraimsson, H. (Swedish Radiation Protection Authority (Sweden)); Iversen, Klaus (Danish Decommissioning (Denmark)); Salmenhaara, S. (VTT Technical Research Centre of Finland (Finland)); Sjoeblom, R. (Tekedo AB, (Sweden))

    2008-07-15

    Today, it is recommended that planning of decommission should form an integral part of the activities over the life cycle of a nuclear facility (planning, building and operation), but it was only in the nineteen seventies that the waste issue really surface. Actually, the IAEA guidelines on decommissioning have been issued as recently as over the last ten years, and international advice on finance of decommissioning is even younger. No general international guideline on cost calculations exists at present. This implies that cost calculations cannot be performed with any accuracy or credibility without a relatively detailed consideration of the radiological prerequisites. Consequently, any cost estimates based mainly on the particulars of the building structures and installations are likely to be gross underestimations. The present study has come about on initiative by the Swedish Nuclear Power Inspectorate (SKI) and is based on a common need in Denmark, Finland, Norway and Sweden. The content of the report may be briefly summarised as follows. The background covers design and operation prerequisites as well as an overview of the various nuclear research facilities in the four participating countries: Denmark, Finland, Norway and Sweden. The purpose of the work has been to identify, compile and exchange information on facilities and on methodologies for cost calculation with the aim of achieving an 80 % level of confidence. The scope has been as follows: 1) to establish a Nordic network 2) to compile dedicated guidance documents on radiological surveying, technical planning and financial risk identification and assessment 3) to compile and describe techniques for precise cost calculations at early stages 4) to compile plant and other relevant data A separate section is devoted in the report to good practice for the specific purpose of early but precise cost calculations for research facilities, and a separate section is devoted to techniques for assessment of cost

  14. Radiochemical analysis for nuclear waste management in decommissioning

    Energy Technology Data Exchange (ETDEWEB)

    Hou, X. (Technical Univ. of Denmark, Risoe National Lab. for Sustainable Energy. Radiation Research Div., Roskilde (Denmark))

    2010-07-15

    The NKS-B RadWaste project was launched from June 2009. The on-going decommissioning activities in Nordic countries and current requirements and problems on the radiochemical analysis of decommissioning waste were discussed and overviewed. The radiochemical analytical methods used for determination of various radionuclides in nuclear waste are reviewed, a book was written by the project partners Jukka Lehto and Xiaolin Hou on the chemistry and analysis of radionuclide to be published in 2010. A summary of the methods developed in Nordic laboratories is described in this report. The progresses on the development and optimization of analytical method in the Nordic labs under this project are presented. (author)

  15. A techno-economic assessment of primary heat transport system decontamination in support of decommissioning Pickering Nuclear Generating Stations

    Energy Technology Data Exchange (ETDEWEB)

    Husain, A.; Krasznai, J. [Kinectrics, Inc., Analytical and Waste Services Dept., Toronto, Ontario, (Canada); Vijay, R. [Ontario Power Generation, Nuclear Decommissioning Organization, Toronto, Ontario, (Canada)

    2013-07-01

    The operating reactor units at Pickering are expected to be permanently shut down by approximately 2020 (this nominal date is for planning purposes only) and then decommissioned. OPG has adopted the 'Deferred Dismantling' strategy for decommissioning its nuclear plants. In contrast with prompt dismantling, radioactive decay leads to reduced dose expenditure during deferred dismantling. As part of the decommissioning strategy, chemical decontamination of the primary heat transport (PHT) system may be undertaken prior to Safe Storage. Decommissioning costs depend significantly on the chosen deferral period. The overall objective of the present work was to contribute to the optimization of the existing decommissioning plan by assessing the benefits of decontamination. Accordingly, an overall cost-benefit analysis for PHT system decontamination was performed. Details are presented in this paper. (author)

  16. Reserves for nuclear power plant decommissioning and radwaste disposal in Germany. An analysis and evaluation from the angle of energy policy; Energiewirtschaftliche Bewertung der Rueckstellungen fuer die Entsorgung der deutschen Kernkraftwerke

    Energy Technology Data Exchange (ETDEWEB)

    Buerger, V. [comp.

    1998-12-31

    The study, which is the first of its kind in Germany, presents a comprehensive survey of total reserves set up by the German nuclear industry for liabilities and costs for nuclear power plant decommissioning and resulting radwaste disposal, which is a legal and foreseeable responsibility but uncertain in amount. The study looks into the various ways the earmarked money was invested and analyses the funds with respect to their efficiency and reliability to provide financial security for the given tasks and purpose. The question put in this context is: Are the reserves set up so far in line with official cost estimates, i.e. will they cover estimated costs, or do they even exceed the estimated amounts? The conclusions drawn and explained in this document are: The reserves for nuclear decommissioning have been used by the nuclear power plant operators and electricity companies as a significant capital source. Some of the capital accrued is being increasingly used at present to cover expenses arising for restructuring of business and diversification into new business segments of interest in the open national and European electricity markets. Companies such as RWE, Preussen Elektra, and Bayernwerk, which until deregulation of the energy sector were just power supply companies, have been transformed into conglomerate companies and international players in the markets, like RWE Holding, VEBA, and VIAG. It can be safely assumed that the companies would not have been able to reach the important positions they currently hold in the German economy without tapping the reserves for nuclear decommissioning. (orig./CB) 27 refs. [Deutsch] Die Studie gibt erstmals einen vollstaendigen Ueberblick ueber die Summe der in Deutschland gebildeten Rueckstellungen im Kernenergiebereich. Sie geht der Frage nach, wie diese Gelder angelegt sind und ob die praktizierten Anlageformen dem hohen Sicherheitsanspruch entsprechen, den die Gesellschaft an die finanziellen Ressourcen zur Bewaeltigung

  17. Screening evaluation of radionuclide groundwater concentrations for the end state basement fill model Zion Nuclear Power Station decommissioning project

    Energy Technology Data Exchange (ETDEWEB)

    Sullivan T.

    2014-06-09

    ZionSolutions is in the process of decommissioning the Zion Nuclear Power Plant. The site contains two reactor Containment Buildings, a Fuel Building, an Auxiliary Building, and a Turbine Building that may be contaminated. The current decommissioning plan involves removing all above grade structures to a depth of 3 feet below grade. The remaining underground structures will be backfilled with clean material. The final selection of fill material has not been made.

  18. Cost calculations for decommissioning and dismantling of nuclear research facilities, Phase 1

    Energy Technology Data Exchange (ETDEWEB)

    Andersson, Inga [StudsvikNuclear AB (Sweden); Backe, S. [Institute for Energy Technology (Norway); Iversen, Klaus [Danish Decommissioning (Denmark); Lindskog, S [Swedish Nuclear Power Inspectorate (Sweden); Salmenhaara, S. [VTT Technical Research Centre of Finland (Finland); Sjoeblom, R. [Tekedo AB (Sweden)

    2006-11-15

    Today, it is recommended that planning of decommission should form an integral part of the activities over the life cycle of a nuclear facility. However, no actual international guideline on cost calculations exists at present. Intuitively, it might be tempting to regard costs for decommissioning of a nuclear facility as similar to those of any other plant. However, the presence of radionuclide contamination may imply that the cost is one or more orders of magnitude higher as compared to a corresponding inactive situation, the actual ratio being highly dependent on the level of contamination as well as design features and use of the facility in question. Moreover, the variations in such prerequisites are much larger than for nuclear power plants. This implies that cost calculations cannot be performed with any accuracy or credibility without a relatively detailed consideration of the radiological and other prerequisites. Application of inadequate methodologies especially at early stages has often lead to large underestimations. The goals of the project and the achievements described in the report are as follows: 1) Advice on good practice with regard to: 1a) Strategy and planning; 1b) Methodology selection; 1c) Radiological surveying; 1d) Uncertainty analysis; 2) Techniques for assessment of costs: 2a) Cost structuring; 2b) Cost estimation methodologies; 3) Compilation of data for plants, state of planning, organisations, etc.; 3a) General descriptions of relevant features of the nuclear research facilities; 3b) General plant specific data; 3c) Example of the decommissioning of the R1 research reactor in Sweden; 3d) Example of the decommissioning of the DR1 research reactor in Denmark. In addition, but not described in the present report, is the establishment of a Nordic network in the area including an internet based expert system. It should be noted that the project is planned to exist for at least three years and that the present report is an interim one

  19. CONSIDERATIONS FOR THE DEVELOPMENT OF A DEVICE FORTHE DECOMMISSIONING OF THE FUEL CHANNELS IN THECANDU NUCLEAR REACTOR

    Directory of Open Access Journals (Sweden)

    Gabi ROSCA FARTAT

    2013-05-01

    Full Text Available As many nuclear power plants are reaching their end of lifecycle, the decommissioning of theseinstallations has become one of the 21stcentury’s great challenges. Each project may be managed differently,depending on the country, development policies, financial considerations, and the availability of qualifiedengineers or specialized companies to handle such projects. The principle objective of decommissioning is toplace a facility into such a condition that there is no unacceptable risk from the decommissioned facility topublic health and safety of the environment. In order to ensure that at the end of its life the risk from a facility iswithin acceptable bounds, action is normally required. The overall decommissioning strategy is todeliver a timely, cost-effective program while maintaining high standards of safety, security and environmentalprotection. If facilities were not decommissioned, they could degrade and potentially present an environmentalradiological hazard in the future. Simply abandoning or leaving a facility after ceasing operations is notconsidered to be an acceptable alternative to decommissioning. The final aim of decommissioning is torecover the geographic site to its original condition.

  20. Research in decommissioning techniques for nuclear fuel cycle facilities in JNC. 7. JWTF decommissioning techniques

    Energy Technology Data Exchange (ETDEWEB)

    Ogawa, Ryuichiro; Ishijima, Noboru [Japan Nuclear Cycle Development Inst., Oarai, Ibaraki (Japan). Oarai Engineering Center

    1999-02-01

    Decommissioning techniques such as radiation measuring and monitoring, decontamination, dismantling and remote handling in the world were surveyed to upgrading technical know-how database for decommissioning of Joyo Waste Treatment Facility (JWTF). As the result, five literatures for measuring and monitoring techniques, 14 for decontamination and 22 for dismantling feasible for JWTF decommissioning were obtained and were summarized in tables. On the basis of the research, practical applicability of those techniques to decommissioning of JWTF was evaluated. This report contains brief surveyed summaries related to JWTF decommissioning. (H. Itami)

  1. Progress on Radiochemical Analysis for Nuclear Waste Management in Decommissioning

    DEFF Research Database (Denmark)

    Hou, Xiaolin; Qiao, Jixin; Shi, Keliang

    With the increaed numbers of nuclear facilities have been closed and are being or are going to be decommissioned, it is required to characterise the produced nuclear waste for its treatment by identification of the radionuclides and qualitatively determine them. Of the radionuclides related...... separation of radionuclides. In order to improve and maintain the Nodic competence in analysis of radionculides in waste samples, a NKS B project on this topic was launched in 2009. During the first phase of the NKS-B RadWaste project (2009-2010), a good achivement has been reached on establishment...... of collaboration, identifing the requirements from the Nordic nuclear industries and optimizing and development of some analytical methods (Hou et al. NKS-222, 2010). In the year 2011, this project (NKS-B RadWaste2011) continued. The major achievements of this project in 2011 include: (1) development of a method...

  2. Decontamination techniques for decommissioning nuclear cycle facilities COGEMA experience and R and R

    Energy Technology Data Exchange (ETDEWEB)

    Decobert, G.; Bordie, J. C. [COGEMA FCR/DSDP, St Quentin-en-Yvelines (France); Faury, M.; Fournel, B. [Commissariat aa l' Energie Atomique, CEN Cadarache DESD/SEP/LETD, Paul lez Durance (France)

    1999-07-01

    All industrial nuclear facilities have a limited life-time. Then, dismantling at different levels of these facilities occurs and has to be done without endangering decommissioning staff, public and environment. Decontamination is an important procedure and is often used ina dismantling operation. It doesn't noly reduce irradiation dose for workers during decommissioning operations, according to the ALARA (As Low As Reasonably Achievable) principle, but also has the potential for waste downgrading in order to achieve lower disposal costs. The COGEMA group which is world-leader in the nuclear fuel cycle from uranium prospecting to spent fuel reprocessing and recycling (including refining, conversion, enrichment of natural uranium, manufacturing of nuclear fuels and waste conditioning) has already been involved in nuclear clean-up and decommissioning programs and participates in several R and D projects with the CEA (Commissariat aa l'Energie Atomique). This paper will present first some example of the experience acquired on COGEMA and the CEA sites: - COGEMA La Hague reprocessing plant operating and heavy maintenance experience. - COGEMA Marcoule UP1 decommissioning feed-back experience. - Various CEA decommissioning operations. The experience acquired in the plant during operation clearly shows that, for most chemical equipment, conventional rinsing ensures sufficient internal decontamination to allow dismantling. Nevertheless, some specific equipment will require more aggressive reactants to lower the final dose rate. At this stage, the choice for a process is done step. Preliminary information is needed such as the physical state of the installation, the nature of the support, the radioactive inventory and its history whenever possible. After carrying inactive and active testing at a pilot level on the most promising processes, particular attention have to be put on the generated waste. (volume, treatment and final repository). COGEMA is developing a

  3. Nuclear facility decommissioning and site remedial actions: a selected bibliography

    Energy Technology Data Exchange (ETDEWEB)

    Owen, P.T.; Knox, N.P.; Fielden, J.M.; Johnson, C.A.

    1982-09-01

    This bibliography contains 693 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions. Foreign, as well as domestic, literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included in this publication. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's Remedial Action Program. Major chapters are Surplus Facilities Management Program, Nuclear Facilities Decommissioning, Formerly Utilized Sites Remedial Action Program, Uranium Mill Tailings Remedial Action Program, Grand Junction Remedial Action Program, and Uranium Mill Tailings Management. Chapter sections for chapters 1 and 2 include: Design, Planning, and Regulations; Site Surveys; Decontamination Studies; Dismantlement and Demolition; Land Decontamination and Reclamation; Waste Disposal; and General Studies. The references within each chapter are arranged alphabetically by leading author. References having no individual author are arranged by corporate author or by title. Indexes are provided for (1) author; (2) corporate affiliation; (3) title; (4) publication description; (5) geographic location; and (6) keywords. An appendix of 202 bibliographic references without abstracts or indexes has been included in this bibliography. This appendix represents literature identified but not abstracted due to time constraints.

  4. Progress on radiochemical analysis for nuclear waste management in decommissioning

    Energy Technology Data Exchange (ETDEWEB)

    Hou, X. (Technical Univ. of Denmark. Center for Nuclear Technologies (NuTech), Roskilde (Denmark))

    2012-01-15

    This report summarized the progress in the development and improvement of radioanalytical methods for decommissioning and waste management completed in the NKS-B RadWaste 2011 project. Based on the overview information of the analytical methods in Nordic laboratories and requirement from the nuclear industry provided in the first phase of the RadWaste project (2010), some methods were improved and developed. A method for efficiently separation of Nb from nuclear waste especially metals for measurement of long-lived 94Nb by gamma spectrometry was developed. By systematic investigation of behaviours of technetium in sample treatment and chromatographic separation process, an effective method was developed for the determination of low level 99Tc in waste samples. An AMS approachment was investigated to measure ultra low level 237Np using 242Pu for AMS normalization, the preliminary results show a high potential of this method. Some progress on characterization of waste for decommissioning of Danish DR3 is also presented. (Author)

  5. Radiochemical analysis of concrete samples for decommission of nuclear reactors

    Energy Technology Data Exchange (ETDEWEB)

    Zapata-Garcia, Daniel; Wershofen, Herbert [Physikalisch-Technische Bundesanstalt (PTB), Bundesallee 100 38116, Braunschweig (Germany); Larijani, Cyrus; Sobrino-Petrirena, Maitane; Garcia-Miranda, Maria; Jerome, Simon M. [National Physical Laboratory (NPL), Hampton Road, Teddington, Middlesex, TW11 0LW (United Kingdom)

    2014-07-01

    Decommissioning of the oldest nuclear power reactors are some of the most challenging technological legacy issues many countries will face in forthcoming years, as many power reactors reach the end of their design lives. Decommissioning of nuclear reactors generates large amounts of waste that need to be classified according to their radioactive content. Approximately 10 % of the contaminated material ends up in different repositories (depending on their level of contamination) while the rest is decontaminated, measured and released into the environment or sent for recycling. Such classification needs to be done accurately in order to ensure that both the personnel involved in decommissioning and the population at large are not needlessly exposed to radiation or radioactive material and to minimise the environmental impact of such work. However, too conservative classification strategies should not be applied, in order to make proper use of radioactive waste repositories since space is limited and the full process must be cost-effective. Implicit in decommissioning and classification of waste is the need to analyse large amounts of material which usually combine a complex matrix with a non-homogeneous distribution of the radionuclides. Because the costs involved are large, it is possible to make great savings by the adoption of best available practices, such as the use of validated methods for on-site measurements and simultaneous determination of more than one radionuclide whenever possible. The work we present deals with the development and the validation of a procedure for the simultaneous determination of {sup 241}Am, plutonium isotopes, uranium isotopes and {sup 90}Sr in concrete samples. Samples are firstly ground and fused with LiBO{sub 2} and Li{sub 2}B{sub 4}O{sub 7}. After dissolution of the fused sample, silicate and alkaline elements are removed followed by radiochemical separation of the target radionuclides using extraction chromatography. Measurement

  6. Investigation of the responsibility for decommissioning of the Ranstad plant; Utredning av ansvaret foer Ranstadsverkets avveckling

    Energy Technology Data Exchange (ETDEWEB)

    Svensson, Haakan; Grundfelt, Bertil [Kemakta Konsult AB, Stockholm (Sweden); Froeberg, Magnus [Froeberg och Lundholm Advokatbyraa AB, Stockholm (Sweden)

    2010-11-15

    The issue of decommissioning, including demolition, of the nuclear facility at the Ranstad plant was raised gradually during 2006-2008. It was then found that it was unclear which company or companies that could be responsible for this decommissioning, economically as well as for the implementation. During this time and until the end of 2009, the concerned authorities, notably Swedish Nuclear Power Inspectorate and SSM, collected a large amount of facts as a basis for assessing liability. This material now needed to be systematized and compiled in order to effectively be utilized in such an assessment. SSM also thought that it would be helpful if an independent party with experience in similar issues could contribute to the interpretation of the legal situation. These were the given conditions of the mission which Kemakta Konsult AB, with the assistance of lawyer Magnus Froeberg, were given by SSM in the autumn of 2009. The results are presented in this final report.

  7. Development of decommissioning management system for nuclear fuel cycle facilities (DECMAN)

    Energy Technology Data Exchange (ETDEWEB)

    Ogawa, Ryuichirou; Ishijima, Noboru; Tanimoto, Ken-ichi [Japan Nuclear Cycle Development Inst., Oarai, Ibaraki (Japan). Oarai Engineering Center

    1999-04-01

    In making a plan of decommissioning of nuclear fuel facilities, it is important to optimize the plan on the standpoint of a few viewpoints, that is, the amount of working days, workers, radioactive waste, exposure dose of worker, and cost (they are called evaluation indexes). In the midst of decommissioning, the decommissioning plan would be modified suitably to optimize the evaluation indexes adjusting to progress of the decommissioning. The decommissioning management code (DECMAN), that is support system on computer, has been developed to assist the decommissioning planning. The system calculates the evaluation indexes quantitatively. The system consists of three fundamental codes, facility information database code, technical know-how database code and index evaluation code, they are composed using Oracle' database and 'G2' expert system. The functions of the system are as follows. (1) Facility information database code. Information of decommissioning facility and its rooms, machines and pipes in the code. (2) Technical know-how database code. Technical Information of tools to use in decommissioning work, cutting, dose measure, and decontamination are there. (3) Index evaluation code. User build decommissioning program using above two database codes. The code evaluates five indexes, the amount of working days, workers, radioactive waste, exposure dose of worker, and cost, on planning decommissioning program. Results of calculation are shown in table, chart, and etc. (author)

  8. Fracture mechanics characterisation of the beltline welding seam of the decommissioned WWER-440 reactor pressure vessel of nuclear power plant Greifswald Unit 4

    Energy Technology Data Exchange (ETDEWEB)

    Viehrig, Hans-Werner, E-mail: H.W.Viehrig@hzdr.de [Helmholz Zentrum Dresden-Rossendorf, P.O. Box 510119, 01314 Dresden (Germany); Altstadt, Eberhard; Houska, Mario [Helmholz Zentrum Dresden-Rossendorf, P.O. Box 510119, 01314 Dresden (Germany); Valo, Matti [VTT Manufacturing Technology, P.O. Box 17042, 02044 VTT (Finland)

    2012-01-15

    The paper presents data measured for trepans sampled from the decommissioned WWER-440 reactor pressure vessel of the NPP Greifswald Unit 4. The main focus of this work is on fracture toughness characterisation according to test standard ASTM E1921. Large variations in the evaluated reference temperature values, T{sub 0}, across the wall of the multilayer beltline welding seam were observed. Generally, the ductile-to-brittle transition temperature shift predicted by the Russian code for the present content of deleterious elements P and Cu and the accumulated neutron fluences lies within the amount of the scatter of the measured T{sub 0} values. Metallographic investigations show that the T{sub 0} values measured with T-S oriented Charpy size SE(B) specimens from different thickness locations of the multilayer welding seams strongly depend on the microstructure at the specimen crack tip, and, consequently, on the initial structure of the multilayer welding seam. The RPV integrity is discussed, taking into account a pressurised thermal shock scenario. - Highlights: Black-Right-Pointing-Pointer The paper presents data of samples from a decommissioned reactor pressure vessel. Black-Right-Pointing-Pointer The main focus is on fracture toughness characterisation of the beltline weld seam. Black-Right-Pointing-Pointer Large variation in the evaluated reference temperatures T{sub 0} was observed. Black-Right-Pointing-Pointer T{sub 0} values strongly depend on the microstructure at the specimen crack tip. Black-Right-Pointing-Pointer RPV integrity is discussed, taking into account a pressurised thermal shock scenario.

  9. Decommissioning, radioactive waste management and nuclear public information issues in Italy

    Energy Technology Data Exchange (ETDEWEB)

    Enrico Mainardi [AIN - ENEA (Italy)

    2006-07-01

    the international level. The site is extremely stable from the geological point of view. It consists of a 10 km{sup 2} rock-salt layer 150 m thick protected by a clay layer 700 m thick. A similar solution has been adopted successfully for the WIPP (Waste Isolation Pilot Plant) in New Mexico (USA) operating from 1999. This paper outlines the main issues and considerations connected with decommissioning, radioactive waste management and site decision within the country together with more details on the quantities and quality of the Italian nuclear waste. The demonstration that decommissioning is feasible at reasonable costs and that wastes can be collected in a national repository with the highest safety levels will certainly further improve public attitude in favour of nuclear power. (author)

  10. Guidelines of Decommissioning Schedule Establishment

    Energy Technology Data Exchange (ETDEWEB)

    Oh, Jae Yong; Yun, Taesik; Kim, Younggook; Kim, Hee-Geun [KHNP CRI, Daejeon (Korea, Republic of)

    2016-10-15

    Decommissioning has recently become an issue highlighted in Korea due to the Permanent Shutdown (PS) of Kori-1 plant. Since Korea Hydro and Nuclear Power (KHNP) Company decided the PS of Kori-1 instead of further continued operation, Kori-1 will be the first decommissioning plant of the commercial reactors in Korea. Korean regulatory authority demands Initial Decommissioning Plan (IDP) for all the plants in operation and under construction. In addition, decommissioning should be considered for the completion of the life cycle of NPPs. To date, Korea has no experience regarding decommissioning of the commercial reactor and a lot of uncertainties will be expected due to its site-specific factors. However, optimized decommissioning process schedule must be indispensable in the safety and economic efficiency of the project. Differed from USA, Korea has no experience and know-hows of the operation and site management for decommissioning. Hence, in Korea, establishment of decommissioning schedule has to give more weight to safety than precedent cases. More economical and rational schedule will be composed by collecting and analyzing the experience data and site-specific data and information as the decommissioning progresses. In a long-range outlook, KHNP having capability of NPP decommissioning will try to decommissioning business in Korea and foreign countries.

  11. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 13: Part 2, Indexes

    Energy Technology Data Exchange (ETDEWEB)

    Goins, L.F.; Webb, J.R.; Cravens, C.D.; Mallory, P.K.

    1992-09-01

    This is part 2 of a bibliography on nuclear facility decommissioning and site remedial action. This report contains indexes on the following: authors, corporate affiliation, title words, publication description, geographic location, subject category, and key word.

  12. Characterisation of radioactive waste products associated with plant decommissioning.

    Science.gov (United States)

    Sejvar, J; Fero, A H; Gil, C; Hagler, R J; Santiago, J L; Holgado, A; Swenson, R

    2005-01-01

    The inventory of radioactivity that must be considered in the decommissioning of a typical 1000 MWe Spanish pressurised water reactor (PWR) was investigated as part of a generic plant decommissioning study. Analyses based on DORT models (in both R-Z and R-theta geometries) were used with representative plant operating history and core power distribution data in defining the expected neutron environment in regions near the reactor core. The activation analyses were performed by multiplying the DORT scalar fluxes by energy-dependent reaction cross sections (based on ENDF/B-VI data) to generate reaction rates on a per atom basis. The results from the ORIGEN2 computer code were also used for determining the activities associated with certain nuclides where multi-group cross section data were not available. In addition to the bulk material activation of equipment and structures near the reactor, the activated corrosion-product (or 'crud') deposits on system and equipment surfaces were considered. The projected activities associated with these sources were primarily based on plant data and experience from operating PWR plants.

  13. Nonlinear Control of Hydraulic Manipulator for Decommissioning Nuclear Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Myoung-Ho; Lee, Sung-Uk; Kim, Chang-Hoi; Choi, Byung-Seon; Moon, Jei-Kwon [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2016-10-15

    Robot technique is need to decommission nuclear reactor because of high radiation environment. Especially, Manipulator systems are useful for dismantling complex structure in a nuclear facility. In addition, Hydraulic system is applied to handle heavy duty object. Since hydraulic system can demonstrate high power. The manipulator with hydraulic power is already developed. To solve this problem, various nonlinear control method includes acceleration control. But, it is difficult because acceleration value is highly noisy. In this paper, the nonlinear control algorithm without acceleration control is studied. To verify, the hydraulic manipulator model had been developed. Furthermore, the numerical simulation is carried out. The nonlinear control without acceleration parameter method is developed for hydraulic manipulator. To verify control algorithm, the manipulator is modeled by MBD and the hydraulic servo system is also derived. In addition, the numerical simulation is also carried out. Especially, PID gain is determined though TDC algorithm. In the result of numerical simulation, tracking performance is good without acceleration control. Thus, the PID though TDC with SMC is good for hydraulic manipulator control.

  14. Technology, Safety and Costs of Decommissioning Nuclear Reactors At Multiple-Reactor Stations

    Energy Technology Data Exchange (ETDEWEB)

    Wittenbrock, N. G.

    1982-01-01

    Safety and cost information is developed for the conceptual decommissioning of large (1175-MWe) pressurized water reactors (PWRs) and large (1155-MWe) boiling water reactors {BWRs) at multiple-reactor stations. Three decommissioning alternatives are studied: DECON (immediate decontamination), SAFSTOR (safe storage followed by deferred decontamination), and ENTOMB (entombment). Safety and costs of decommissioning are estimated by determining the impact of probable features of multiple-reactor-station operation that are considered to be unavailable at a single-reactor station, and applying these estimated impacts to the decommissioning costs and radiation doses estimated in previous PWR and BWR decommissioning studies. The multiple-reactor-station features analyzed are: the use of interim onsite nuclear waste storage with later removal to an offsite nuclear waste disposal facility, the use of permanent onsite nuclear waste disposal, the dedication of the site to nuclear power generation, and the provision of centralized services. Five scenarios for decommissioning reactors at a multiple-reactor station are investigated. The number of reactors on a site is assumed to be either four or ten; nuclear waste disposal is varied between immediate offsite disposal, interim onsite storage, and immediate onsite disposal. It is assumed that the decommissioned reactors are not replaced in one scenario but are replaced in the other scenarios. Centralized service facilities are provided in two scenarios but are not provided in the other three. Decommissioning of a PWR or a BWR at a multiple-reactor station probably will be less costly and result in lower radiation doses than decommissioning an identical reactor at a single-reactor station. Regardless of whether the light water reactor being decommissioned is at a single- or multiple-reactor station: • the estimated occupational radiation dose for decommissioning an LWR is lowest for SAFSTOR and highest for DECON • the estimated

  15. The Study on Domestic and Foreign Cases for Decommissioning of DPRK Nuclear Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Baek, Ye Ji; Hhu, Joo Youn; Lee, Jung Hyun; Hwang, Yong Soo [Korea Institute of Nuclear Non-proliferation and Control, Daejeon (Korea, Republic of)

    2016-05-15

    This study was able to analyze domestic and foreign cases, and collect data on the approximate amount of waste and time required time; however, data on applied technology, input manpower, required cost, and waste disposal method was insufficient. DPRK activities such as nuclear weapon development or nuclear testing not only threaten our country's security but also have an adverse effect on nuclear nonproliferation and security in the international society. Therefore, denuclearization of the DPRK is prior task that is essential to peace on the Korean Peninsula. The fundamental purpose of denuclearization of the DPRK is to safely decommission facilities related to developing nuclear weapons and to depose related radioactive waste and nuclear materials. Understanding descriptive references and physical properties of the facility and its purpose important for decommissioning nuclear facilities. Although it was impossible to collect data on DPRK nuclear facilities to perform complete decommissioning, we were able to understand the process used at DPRK nuclear facilities with open source data. This study has been conducted to establish overall measures for decommissioning DPRK nuclear facilities. DPRK nuclear facilities in this study include a IRT- 2000 type nuclear research reactor, a 5 MWe graphite moderated reactor, nuclear fuel fabrication facility, and a nuclear fuel reprocessing facility, which are considered as facilities that produce or manufacture nuclear materials needed for nuclear weapons or related to such activities.

  16. Decommissioning of nuclear facilities at the Nuclear Research Institute Rez plc

    Directory of Open Access Journals (Sweden)

    Podlaha Josef

    2010-01-01

    Full Text Available The Nuclear Research Institute Rez has been a leading institution in all areas of nuclear R&D in the Czech Republic since it was established in 1955. After more than 50 years of activities in the field, there are some environmental liabilities that need to be remedied. The remediation of old environmental liabilities concerning the Nuclear Research Institute is the only ongoing decommissioning project in the Czech Republic. The nature of these environmental liabilities is very specific and requires special remediation procedures. The process begun in 2003 and is expected to be finished by 2014.

  17. Decommissioning of nuclear facilities in Europe. Status December 2014; Stilllegung kerntechnischer Anlagen in Europa. Stand: Dezember 2014

    Energy Technology Data Exchange (ETDEWEB)

    Brendebach, Boris; Imielski, Przemyslaw [Gesellschaft fuer Anlagen- und Reaktorsicherheit, Koeln (Germany); Kuehn, Kerstin; Rehs, Bernd

    2015-05-15

    The report on decommissioning activities of nuclear facilities in Europe (status December 2014) summarizes the reasons and plans for decommissioning, the regulations and responsibilities, the decommissioning strategies and the finalized decommissioning projects. The specific activities are described for Armenia, Belgium, Bulgaria, Denmark, Germany, Estonia, Finland, France, Greece, UK, Italy, Croatia, Latvia, Lithuania, Moldavia, Netherlands, Norway, Austria, Poland, Portugal, Rumania, Russia, Sweden, Switzerland, Serbia, Slovakia, Spain, Czech Republic, Turkey, Ukraine, Hungary and Belarus.

  18. CONSIDERATIONS FOR THE DEVELOPMENT OF A DEVICE FOR THE DECOMMISSIONING OF THE HORIZONTAL FUEL CHANNELS IN THE CANDU 6 NUCLEAR REACTOR. PART 6 - PRESENTATION OF THE DECOMMISSIONING DEVICE

    Directory of Open Access Journals (Sweden)

    Gabi ROSCA FARTAT

    2015-05-01

    Full Text Available The objective of this paper is to present a possible solution for the designing of a device for the decommissioning of the horizontal fuel channels in the CANDU 6 nuclear reactor. The decommissioning activities are dismantling, demolition, controlled removal of equipment, components, conventional or hazardous waste (radioactive, toxic in compliance with the international basic safety standards on radiation protection. One as the most important operation in the final phase of the nuclear reactor dismantling is the decommissioning of fuel channels. For the fuel channels decommissioning should be taken into account the detailed description of the fuel channel and its components, the installation documents history, adequate radiological criteria for decommissioning guidance, safety and environmental impact assessment, including radiological and non-radiological analysis of the risks that can occur for workers, public and environment, the description of the proposed program for decommissioning the fuel channel and its components, the description of the quality assurance program and of the monitoring program, the equipments and methods used to verify the compliance with the decommissioning criteria, the planning of performing the final radiological assessment at the end of the fuel channel decommissioning. These will include also, a description of the proposed radiation protection procedures to be used during decommissioning. The dismantling of the fuel channel is performed by one device which shall provide radiation protection during the stages of decommissioning, ensuring radiation protection of the workers. The device shall be designed according to the radiation protection procedures. The decommissioning device assembly of the fuel channel components is composed of the device itself and moving platform support for coupling of the selected channel to be dismantled. The fuel channel decommissioning device is an autonomous device designed for

  19. Guideline to Estimate Decommissioning Costs

    Energy Technology Data Exchange (ETDEWEB)

    Yun, Taesik; Kim, Younggook; Oh, Jaeyoung [KHNP CRI, Daejeon (Korea, Republic of)

    2016-10-15

    The primary objective of this work is to provide guidelines to estimate the decommissioning cost as well as the stakeholders with plausible information to understand the decommissioning activities in a reasonable manner, which eventually contribute to acquiring the public acceptance for the nuclear power industry. Although several cases of the decommissioning cost estimate have been made for a few commercial nuclear power plants, the different technical, site-specific and economic assumptions used make it difficult to interpret those cost estimates and compare them with that of a relevant plant. Trustworthy cost estimates are crucial to plan a safe and economic decommissioning project. The typical approach is to break down the decommissioning project into a series of discrete and measurable work activities. Although plant specific differences derived from the economic and technical assumptions make a licensee difficult to estimate reliable decommissioning costs, estimating decommissioning costs is the most crucial processes since it encompasses all the spectrum of activities from the planning to the final evaluation on whether a decommissioning project has successfully been preceded from the perspective of safety and economic points. Hence, it is clear that tenacious efforts should be needed to successfully perform the decommissioning project.

  20. Decommissioning: a problem or a challenge?

    Directory of Open Access Journals (Sweden)

    Mele Irena

    2004-01-01

    Full Text Available With the ageing of nuclear facilities or the reduced interest in their further operation, a new set of problems, related to the decommissioning of these facilities, has come into forefront. In many cases it turns out that the preparations for decommissioning have come too late, and that financial resources for covering decommissioning activities have not been provided. To avoid such problems, future liailities should be thoroughly estimated in drawing up the decommissioning and waste management programme for each nuclear facility in time, and financial provisions for implementing such programme should be provided. In this paper a presentation of current decommissioning experience in Slovenia is given. The main problems and difficulties in decommissioning of the Žirovski Vrh Uranium Mine are exposed and the lesson learned from this case is presented. The preparation of the decommissioning programme for the Nuclear Power Plant Krško is also described, and the situation at the TRIGA research reactor is briefly discussed.

  1. Nuclear reactor decommissioning. (Latest citations from the NTIS bibliographic database). Published Search

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-01

    The bibliography contains citations concerning nuclear power and research reactor decommissioning and decontamination plans, costs, and safety standards. References discuss the design and evaluation of protective confinement, entombment, and dismantling systems. Topics include decommissioning regulations and rules, public and occupational radiation exposure estimates, comparative evaluation, and reactor performance under high neutron flux conditions. Waste packaging and disposal, environmental compliance, and public opinion are examined. (Contains 50-250 citations and includes a subject term index and title list.) (Copyright NERAC, Inc. 1995)

  2. Technology, safety, and costs of decommissioning reference nuclear research and test reactors. Main report

    Energy Technology Data Exchange (ETDEWEB)

    Konzek, G.J.; Ludwick, J.D.; Kennedy, W.E. Jr.; Smith, R.I.

    1982-03-01

    Safety and Cost Information is developed for the conceptual decommissioning of two representative licensed nuclear research and test reactors. Three decommissioning alternatives are studied to obtain comparisons between costs (in 1981 dollars), occupational radiation doses, potential radiation dose to the public, and other safety impacts. The alternatives considered are: DECON (immediate decontamination), SAFSTOR (safe storage followed by deferred decontamination), and ENTOMB (entombment). The study results are presented in two volumes. Volume 1 (Main Report) contains the results in summary form.

  3. CONSIDERATIONS FOR THE DEVELOPMENT OF A DEVICE FOR THE DECOMMISSIONING OF THE HORIZONTAL FUEL CHANNELS IN THE CANDU 6 NUCLEAR REACTOR PART 2 - FUEL CHANNEL PRESENTATION

    Directory of Open Access Journals (Sweden)

    Gabi ROSCA FARTAT

    2014-05-01

    Full Text Available As many nuclear power plants are reaching their end of lifecycle, the decommissioning of these installations has become one of the 21st century’s great challenges. Each project may be managed differently, depending on the country, development policies, financial considerations, and the availability of qualified engineers or specialized companies to handle such projects. The principle objective of decommissioning is to place a facility into such a condition that there is no unacceptable risk from the decommissioned facility to public health and safety of the environment. In order to ensure that at the end of its life the risk from a facility is within acceptable bounds, action is normally required. The overall decommissioning strategy is to deliver a timely, costeffective program while maintaining high standards of safety, security and environmental protection. If facilities were not decommissioned, they could degrade and potentially present an environmental radiological hazard in the future. Simply abandoning or leaving a facility after ceasing operations is not considered to be an acceptable alternative to decommissioning.The final aim of decommissioning is to recover the geographic site to its original condition.

  4. CONSIDERATIONS FOR THE DEVELOPMENT OF A DEVICE FOR THE DECOMMISSIONING OF THE HORIZONTAL FUEL CHANNELS IN THE CANDU 6 NUCLEAR REACTOR PART 4 - FUEL CHANNEL ASSEMBLY

    Directory of Open Access Journals (Sweden)

    Gabi ROSCA FARTAT

    2014-05-01

    Full Text Available As many nuclear power plants are reaching their end of lifecycle, the decommissioning of these installations has become one of the 21st century’s great challenges. Each project may be managed differently, depending on the country, development policies, financial considerations, and the availability of qualified engineers or specialized companies to handle such projects. The principle objective of decommissioning is to place a facility into such a condition that there is no unacceptable risk from the decommissioned facility to public health and safety of the environment. In order to ensure that at the end of its life the risk from a facility is within acceptable bounds, action is normally required. The overall decommissioning strategy is to deliver a timely, costeffective program while maintaining high standards of safety, security and environmental protection. If facilities were not decommissioned, they could degrade and potentially present an environmental radiological hazard in the future. Simply abandoning or leaving a facility after ceasing operations is not considered to be an acceptable alternative to decommissioning. The final aim of decommissioning is to recover the geographic site to its original condition.

  5. CONSIDERATIONS FOR THE DEVELOPMENT OF A DEVICE FOR THE DECOMMISSIONING OF THE HORIZONTAL FUEL CHANNELS IN THE CANDU 6 NUCLEAR REACTOR PART 3 - FUEL CHANNEL REFERENCES

    Directory of Open Access Journals (Sweden)

    Gabi ROSCA FARTAT

    2014-05-01

    Full Text Available As many nuclear power plants are reaching their end of lifecycle, the decommissioning of these installations has become one of the 21st century’s great challenges. Each project may be managed differently, depending on the country, development policies, financial considerations, and the availability of qualified engineers or specialized companies to handle such projects. The principle objective of decommissioning is to place a facility into such a condition that there is no unacceptable risk from the decommissioned facility to public health and safety of the environment. In order to ensure that at the end of its life the risk from a facility is within acceptable bounds, action is normally required. The overall decommissioning strategy is to deliver a timely, cost-effective program while maintaining high standards of safety, security and environmental protection. If facilities were not decommissioned, they could degrade and potentially present an environmental radiological hazard in the future. Simply abandoning or leaving a facility after ceasing operations is not considered to be an acceptable alternative to decommissioning. The final aim of decommissioning is to recover the geographic site to its original condition.

  6. Comments on conceptual questions concerning the clearance of wastes for disposal on a dump site during the decommissioning and dismantling of the nuclear power plant Obrigheim (KWO); Stellungnahme zu konzeptionellen Fragen der Freigabe zur Beseitigung auf einer Deponie bei Stilllegung und Abbau des Kernkraftwerks Obrigheim (KWO)

    Energy Technology Data Exchange (ETDEWEB)

    Kueppers, Christian

    2015-08-03

    The comments on conceptual questions concerning the clearance of wastes for disposal on a dump site during the decommissioning and dismantling of the nuclear power plant Obrigheim (KWO) cover the following issues: fundamentals of the 10 micro-Sv concept for clearance; specific regulations for the clearance of wastes from the dismantling of KWO for disposal on a dump site; disposal concept at shutdown and dismantling of KWO; measurements and control during clearance for disposal during shutdown and dismantling of KWO; documentation and reports.

  7. Development of the scenario-based training system to reduce hazards and prevent accidents during decommissioning of nuclear facilities

    Energy Technology Data Exchange (ETDEWEB)

    Jeong, KwanSeong; Choi, Jong-Won; Moon, JeiKwon; Choi, ByungSeon; Hyun, Dongjun; Lee, Jonghwan; Kim, IkJune; Kim, GeunHo; Kang, ShinYoung [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2015-10-15

    Decommissioning of nuclear facilities has to be accomplished by assuring the safety of workers. Decommissioning workers need familiarization with working environments because working environment is under high radioactivity and work difficulty during decommissioning of nuclear facilities. On-the-job training of decommissioning works could effectively train decommissioning workers but this training approach could consume much costs and poor modifications of scenarios. The efficiency of virtual training system could be much better than that of physical training system. This paper was intended to develop the training system to prevent accidents for decommissioning of nuclear facilities. The requirements for the training system were drawn. The data management modules for the training system were designed. The training system of decommissioning workers was developed on the basis of virtual reality which is flexibly modified. The visualization and measurement in the training system were real-time done according as changes of the decommissioning scenario. It can be concluded that this training system enables the subject to improve his familiarization about working environments and to prevent accidents during decommissioning of nuclear facilities. In the end, the safety during decommissioning of nuclear facilities will be guaranteed under the principle of ALARA.

  8. Environmental survey near a decommissioning nuclear facility: example of tritium monitoring in the terrestrial environment of Creys-Malville - Environmental survey near a nuclear facility undergoing decommissioning: example of tritium monitoring in the terrestrial environment of Creys-Malville

    Energy Technology Data Exchange (ETDEWEB)

    Boyer, C.; Gontier, G.; Chauveau, J.L. [EDF CIDEN, Division Environnement, 154 Avenue Thiers, 69458 Lyon (France); Pourcelot, L.; Roussel-Debet, S.; Cossonnet, P.C. [IRSN, LERCM Cadarache and LMRE Orsay (France); Jean-Baptiste, P. [LSCE, UMR 1572-CEA/CNRS/UVQS, 91198 Gif sur Yvette (France)

    2014-07-01

    As part of the regulatory environmental monitoring around its nuclear power plants (NPP) in France, EDF carries out more than 40.000 measurements of radionuclides in the environment every year. In addition, EDF performs more detailed radioecological surveys on all of its sites. The purposes of these surveys are: 1/ to control that radioactive discharge limits prescribed by the regulatory authority are respected, 2/ to monitor the environment of the NPPs to verify normal plant operation and to detect all possible failures in power station operation at an early stage and 3/ to establish if there is any increase of radionuclides of anthropogenic origin in the environment and to determine whether this build-up can be attributed to plant operations. Radioecological surveys are conducted in the environment surrounding each of EDF's NPPs. Samples are collected in surrounding ecosystems (terrestrial and aquatic) where the radioactive releases are discharged (liquid and gaseous discharges). These surveys results enable the examination of the spatial distribution and temporal variability of radionuclide activity in the environment throughout the reactors life, from the first fuel load to the decommissioning of the plant. The results from this monitoring have shown that EDF's nuclear power plants have only a minor effect on radionuclide levels in the environment. These results highlight the efficiency of EDF's efforts to minimise its impacts on the environment via an efficient waste management system and high operating standards of its plants. In particular, tritium is subject to special monitoring for more than 30 years; concentrations of free tritium and organically bound tritium in major environmental compartments are therefore well-known in the vicinity of French NPPs. At the end of a reactor's life, EDF has collected a large amount of reference data before decommissioning operations start. During these operations, EDF pursue the radioecological survey

  9. Survey of technology for decommissioning of nuclear fuel cycle facilities. 8. Remote handling and cutting techniques

    Energy Technology Data Exchange (ETDEWEB)

    Ogawa, Ryuichiro; Ishijima, Noboru [Japan Nuclear Cycle Development Inst., Oarai, Ibaraki (Japan). Oarai Engineering Center

    1999-03-01

    In nuclear fuel cycle facility decommissioning and refurbishment, the remote handling techniques such as dismantling, waste handling and decontamination are needed to reduce personnel radiation exposure. The survey research for the status of R and D activities on remote handling tools suitable for nuclear facilities in the world and domestic existing commercial cutting tools applicable to decommissioning of the facilities was conducted. In addition, the drive mechanism, sensing element and control system applicable to the remote handling devices were also surveyed. This report presents brief surveyed summaries. (H. Itami)

  10. Decommissioning Handbook

    Energy Technology Data Exchange (ETDEWEB)

    1994-03-01

    The Decommissioning Handbook is a technical guide for the decommissioning of nuclear facilities. The decommissioning of a nuclear facility involves the removal of the radioactive and, for practical reasons, hazardous materials to enable the facility to be released and not represent a further risk to human health and the environment. This handbook identifies and technologies and techniques that will accomplish these objectives. The emphasis in this handbook is on characterization; waste treatment; decontamination; dismantling, segmenting, demolition; and remote technologies. Other aspects that are discussed in some detail include the regulations governing decommissioning, worker and environmental protection, and packaging and transportation of the waste materials. The handbook describes in general terms the overall decommissioning project, including planning, cost estimating, and operating practices that would ease preparation of the Decommissioning Plan and the decommissioning itself. The reader is referred to other documents for more detailed information. This Decommissioning Handbook has been prepared by Enserch Environmental Corporation for the US Department of Energy and is a complete restructuring of the original handbook developed in 1980 by Nuclear Energy Services. The significant changes between the two documents are the addition of current and the deletion of obsolete technologies and the addition of chapters on project planning and the Decommissioning Plan, regulatory requirements, characterization, remote technology, and packaging and transportation of the waste materials.

  11. Holdup measurement for nuclear fuel manufacturing plants

    Energy Technology Data Exchange (ETDEWEB)

    Zucker, M.S.; Degen, M.; Cohen, I.; Gody, A.; Summers, R.; Bisset, P.; Shaub, E.; Holody, D.

    1981-07-13

    The assay of nuclear material holdup in fuel manufacturing plants is a laborious but often necessary part of completing the material balance. A range of instruments, standards, and a methodology for assaying holdup has been developed. The objectives of holdup measurement are ascertaining the amount, distribution, and how firmly fixed the SNM is. The purposes are reconciliation of material unbalance during or after a manufacturing campaign or plant decommissioning, to decide security requirements, or whether further recovery efforts are justified.

  12. Holdup measurement for nuclear fuel manufacturing plants

    Energy Technology Data Exchange (ETDEWEB)

    Zucker, M.S.; Degen, M.; Cohen, I.; Gody, A.; Summers, R.; Bisset, P.; Shaub, E.; Holody, D.

    1981-07-13

    The assay of nuclear material holdup in fuel manufacturing plants is a laborious but often necessary part of completing the material balance. A range of instruments, standards, and a methodology for assaying holdup has been developed. The objectives of holdup measurement are ascertaining the amount, distribution, and how firmly fixed the SNM is. The purposes are reconciliation of material unbalance during or after a manufacturing campaign or plant decommissioning, to decide security requirements, or whether further recovery efforts are justified.

  13. Decommissioning of the nuclear facilities at Risø National Laboratory. Descriptions and cost assessment

    DEFF Research Database (Denmark)

    Lauridsen, K.

    2001-01-01

    The report is the result of a project initiated by Risø National Laboratory in June 2000 on request from the Minister of Research and Information Technology. It describes the nuclear facilities at Risø National Laboratory to be decommissioned and gives anassessment of the work to be done and the ......The report is the result of a project initiated by Risø National Laboratory in June 2000 on request from the Minister of Research and Information Technology. It describes the nuclear facilities at Risø National Laboratory to be decommissioned and gives anassessment of the work to be done...... and the costs incurred. Three decommissioning scenarios were considered with decay times of 10, 25 and 40 years for the DR 3 reactor. The assessments conclude, however, that there will not be much to gain by allowing forthe longer decay periods; some operations still will need to be performed remotely....... Furthermore, the report describes some of the legal and licensing framework for the decommissioning and gives an assessment of the amounts of radioactive waste to betransferred to a Danish repository. For a revision of the cost estimate for the decommissioning of the research Reactor DR 3 please consult...

  14. Third party liability of nuclear installation decommissioning with Russian nuclear submarines as an example: insurance versus technologies

    Energy Technology Data Exchange (ETDEWEB)

    Gavrilov, S.D. [PREKSAT Ltd., Moscow (Russian Federation); Derevyankin, A.A. [Reseaarch and Development Institute of Nuclear Power Engineering, Moscow (Russian Federation); Khamyanov, L.P. [All-Russian Research Institute on NPP Operation, Moscow (Russian Federation); Kovalenko, V.N. [Ministry for Nuclear Energy Of Russian, Moscow (Russian Federation); Kovalivich, O.M. [Research and Technological Center for Nuclear and Radiation Safety of Supervisory, Nuclear Energy State Commitee of Russia, Moscow (Russian Federation); Smirnov, P.L. [Nuclear Safety Institute of Russian Academy of Sciences, Moscow (Russian Federation)

    2001-07-01

    Third party and environment of civil liability damage caused by incidents at military nuclear installations, for instance at decommissioned NPS (nuclear powered submarines), may be divided into three main trends: -) Liability of NPS without high-enriched irradiated nuclear fuel (SNF) for its self-submersion (radiation incident); -) Liability of NPS with SNF aboard for its self-submersion (radiation incident); and -) Liability of floating NPS for its SNF discharge (nuclear accident). Without step-by-step transition from the Russian Federation guaranties to insurance and making allowance for liability limits according to the Vienna Convention approach, the sizes of the financial guarantee for the civil liability of the NPS owner (Russian state), in US dollars of 2000, are approximately assessed as the following: -) storing decommissioned NPS or a floating module without SNF - from 12 to 25 thousand dollars per year (per one submarine or module); -) storing decommissioned NPS with SNF inside reactors cores - from 25 to 40 thousand dollars per year; -) assembly-by-assembly removing SNF from reactors' core of decommissioned NPS - up to 1.5 million dollars for undamaged reactor per the discharging period; -) SNF removing within reactor using the filled in-space reactor's core by liquid-phased hardened or dispersed solid-phase materials from decommissioned NPS - from 30 to 50 thousand dollars for undamaged reactor per the discharging period. Both rates and sums for NPS with damaged reactors are to be estimated for the each damaged reactor and NPS at all. It is necessary to perform the measures reducing the risk of nuclear accidents of NPS with undamaged SNF and NPS with damaged reactors in possibly short time. It will allow not only to cut risks by ten times and more, but also to accumulate necessary insurance reserves faster. These measures can be partially or completely executed using the preventing measures reserves assigned to all decommissioned Russian NPS

  15. Technology, safety, and costs of decommissioning reference nuclear research and test reactors. Appendices

    Energy Technology Data Exchange (ETDEWEB)

    Konzek, G.J.; Ludwick, J.D.; Kennedy, W.E. Jr.; Smith, R.I.

    1982-03-01

    Safety and Cost Information is developed for the conceptual decommissioning of two representative licensed nuclear research and test reactors. Three decommissioning alternatives are studied to obtain comparisons between costs (in 1981 dollars), occupational radiation doses, potential radiation dose to the public, and other safety impacts. The alternatives considered are: DECON (immediate decontamination), SAFSTOR (safe storage followed by deferred decontamination), and EMTOMB (entombment). The study results are presented in two volumes. Volume 2 (Appendices) contains the detailed data that support the results given in Volume 1, including unit-component data.

  16. Technology, Safety and Costs of Decommissioning a Reference Uranium Hexafluoride Conversion Plant

    Energy Technology Data Exchange (ETDEWEB)

    Elder, H. K.

    1981-10-01

    Safety and cost information is developed for the conceptual decommissioning of a commercial uranium hexafluoride conversion (UF{sub 6}) plant. Two basic decommissioning alternatives are studied to obtain comparisons between cost and safety impacts: DECON, and passive SAFSTOR. A third alternative, DECON of the plant and equipment with stabilization and long-term care of lagoon wastes. is also examined. DECON includes the immediate removal (following plant shutdown) of all radioactivity in excess of unrestricted release levels, with subsequent release of the site for public use. Passive SAFSTOR requires decontamination, preparation, maintenance, and surveillance for a period of time after shutdown, followed by deferred decontamination and unrestricted release. DECON with stabilization and long-term care of lagoon wastes (process wastes generated at the reference plant and stored onsite during plant operation} is also considered as a decommissioning method, although its acceptability has not yet been determined by the NRC. The decommissioning methods assumed for use in each decommissioning alternative are based on state-of-the-art technology. The elapsed time following plant shutdown required to perform the decommissioning work in each alternative is estimated to be: for DECON, 8 months; for passive SAFSTOR, 3 months to prepare the plant for safe storage and 8 months to accomplish deferred decontamination. Planning and preparation for decommissioning prior to plant shutdown is estimated to require about 6 months for either DECON or passive SAFSTOR. Planning and preparation prior to starting deferred decontamination is estimated to require an additional 6 months. OECON with lagoon waste stabilization is estimated to take 6 months for planning and about 8 months to perform the decommissioning work. Decommissioning cost, in 1981 dollars, is estimated to be $5.91 million for OECON. For passive SAFSTOR, preparing the facility for safe storage is estimated to cost $0

  17. Establishment of the nuclear regulatory framework for the process of decommissioning of nuclear installations in Mexico; Establecimiento del marco regulador nuclear para el proceso de cierre de instalaciones nucleares en Mexico

    Energy Technology Data Exchange (ETDEWEB)

    Salmeron V, J. A.; Camargo C, R.; Nunez C, A., E-mail: juan.salmeron@cnsns.gob.mx [Comision Nacional de Seguridad Nuclear y Salvaguardias, Dr. Barragan 779, Col. Narvarte, 03020 Ciudad de Mexico (Mexico)

    2015-09-15

    Today has not managed any process of decommissioning of nuclear installations in the country; however because of the importance of the subject and the actions to be taken to long term, the Comision Nacional de Seguridad Nuclear y Salvaguardias (CNSNS) in Mexico, accordance with its objectives is developing a National Nuclear Regulatory Framework and defined requirements to ensure the implementation of appropriate safety standards when such activities are performed. In this regard, the national nuclear regulatory framework for nuclear installations and the particular case of nuclear power reactors is presented, as well as a proposed licensing process for the nuclear power plant of Laguna Verde based on international regulations and origin country regulations of the existing reactors in nuclear facilities in accordance with the license conditions of operation to allow to define and incorporate such regulation. (Author)

  18. Decommissioning of the nuclear facilities at Risoe National Laboratory. Descriptions and cost assessment[Denmark

    Energy Technology Data Exchange (ETDEWEB)

    Lauridsen, Kurt [ed.

    2001-02-01

    The report is the result of a project initiated by Risoe National Laboratory in June 2000 on request from the Minister of Research and Information Technology. It describes the nuclear facilities at Risoe National Laboratory to be decommissioned and gives an assessment of the work to be done and the costs incurred. Three decommissioning scenarios were considered with decay times of 10, 25 and 40 years for the DR 3 reactor. The assessments conclude, however, that there will not be much to gain by allowing for the longer decay periods; some operations still will need to be performed remotely. Furthermore, the report describes some of the legal and licensing framework for the decommissioning and gives an assessment of the amounts of radioactive waste to be transferred to a Danish repository. (au)

  19. Standard Guide for Environmental Monitoring Plans for Decommissioning of Nuclear Facilities

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    2010-01-01

    1.1 This guide covers the development or assessment of environmental monitoring plans for decommissioning nuclear facilities. This guide addresses: (1) development of an environmental baseline prior to commencement of decommissioning activities; (2) determination of release paths from site activities and their associated exposure pathways in the environment; and (3) selection of appropriate sampling locations and media to ensure that all exposure pathways in the environment are monitored appropriately. This guide also addresses the interfaces between the environmental monitoring plan and other planning documents for site decommissioning, such as radiation protection, site characterization, and waste management plans, and federal, state, and local environmental protection laws and guidance. This guide is applicable up to the point of completing D&D activities and the reuse of the facility or area for other purposes.

  20. Risk Assessment Strategy for Decommissioning of Fukushima Daiichi Nuclear Power Station

    Directory of Open Access Journals (Sweden)

    Akira Yamaguchi

    2017-03-01

    Full Text Available Risk management of the Fukushima Daiichi Nuclear Power Station decommissioning is a great challenge. In the present study, a risk management framework has been developed for the decommissioning work. It is applied to fuel assembly retrieval from Unit 3 spent fuel pool. Whole retrieval work is divided into three phases: preparation, retrieval, and transportation and storage. First of all, the end point has been established and the success path has been developed. Then, possible threats, which are internal/external and technical/societal/management, are identified and selected. “What can go wrong?” is a question about the failure scenario. The likelihoods and consequences for each scenario are roughly estimated. The whole decommissioning project will continue for several decades, i.e., long-term perspective is important. What should be emphasized is that we do not always have enough knowledge and experience of this kind. It is expected that the decommissioning can make steady and good progress in support of the proposed risk management framework. Thus, risk assessment and management are required, and the process needs to be updated in accordance with the most recent information and knowledge on the decommissioning works.

  1. Risk assessment strategy for decommissioning of Fukushima Daiichi Nuclear Power Station

    Energy Technology Data Exchange (ETDEWEB)

    Yamaguchi, Akira; Jang, Sung Hoon [The University of Tokyo, Tokyo (Japan); Hida, Kazuki [Nuclear Damage Compensation and Decommissioning Facilitation Corporation, Tokyo (Japan); Yamanaka, Yasunori [Tokyo Electric Power Company Holdings, Tokyo (Japan); Narumiya, Yoshiyuki [The Kansai Electric Power Co., Inc., Osaka (Japan)

    2017-03-15

    Risk management of the Fukushima Daiichi Nuclear Power Station decommissioning is a great challenge. In the present study, a risk management framework has been developed for the decommissioning work. It is applied to fuel assembly retrieval from Unit 3 spent fuel pool. Whole retrieval work is divided into three phases: preparation, retrieval, and transportation and storage. First of all, the end point has been established and the success path has been developed. Then, possible threats, which are internal/external and technical/societal/management, are identified and selected. “What can go wrong?” is a question about the failure scenario. The likelihoods and consequences for each scenario are roughly estimated. The whole decommissioning project will continue for several decades, i.e., long-term perspective is important. What should be emphasized is that we do not always have enough knowledge and experience of this kind. It is expected that the decommissioning can make steady and good progress in support of the proposed risk management framework. Thus, risk assessment and management are required, and the process needs to be updated in accordance with the most recent information and knowledge on the decommissioning works.

  2. Decommissioning of a mixed oxide fuel fabrication plant at Winfrith Technolgy Centre

    Energy Technology Data Exchange (ETDEWEB)

    Pengelly, M.G.A. [AEA Technology, Dorchester (United Kingdom)

    1994-01-01

    The Alpha Materials Laboratory (Building A52) at Winfrith contained a mixed oxide fuel fabrication plant which had a capability of producing 10 te/yr of pelleted/compacted fuel and was in operation from 1962 until 1980, when the requirement for this type of fuel in the UK diminished, and the plant became surplus to requirements. A program to develop decommissioning techniques for plutonium plants was started in 1983, addressing the following aspects of alpha plant decommissioning: (1) Re-usable containment systems, (2) Strippable coating technology, (3) Mobile air filtration plant, (4) Size reduction primarily using cold cutting, (5) techniques, (6) Waste packing, and (7) Alpha plant decommissioning methodology. The technology developed has been used to safely and efficiently decommission radioactive plant and equipment including Pu contaminated glove boxes. (63 glove boxes to date) The technology has been widely adopted in the United Kingdom and elsewhere. This paper outlines the general strategies adopted and techniques used for glove box decommissioning in building A52.

  3. Study on Evaluation of Project Management Data for Decommissioning of Uranium Refining and Conversion Plant - 12234

    Energy Technology Data Exchange (ETDEWEB)

    Usui, Hideo; Izumo, Sari; Tachibana, Mitsuo [Japan Atomic Energy Agency, Tokai-mura, Naka-gun, Ibaraki, 319-1195 (Japan); Shibahara, Yuji [Japan Atomic Energy Agency, Tokai-mura, Naka-gun, Ibaraki, 319-1195 (Japan); University of Fukui, Fukui-shi, Fukui, 910-8507 (Japan); Morimoto, Yasuyuki; Tokuyasu, Takashi; Takahashi, Nobuo; Tanaka, Yoshio; Sugitsue, Noritake [Japan Atomic Energy Agency, Kagamino-cho, Tomata-gun, Okayama, 708-0698 (Japan)

    2012-07-01

    Some of nuclear facilities that would no longer be required have been decommissioned in JAEA (Japan Atomic Energy Agency). A lot of nuclear facilities have to be decommissioned in JAEA in near future. To implement decommissioning of nuclear facilities, it was important to make a rational decommissioning plan. Therefore, project management data evaluation system for dismantling activities (PRODIA code) has been developed, and will be useful for making a detailed decommissioning plan for an object facility. Dismantling of dry conversion facility in the uranium refining and conversion plant (URCP) at Ningyo-toge began in 2008. During dismantling activities, project management data such as manpower and amount of waste generation have been collected. Such collected project management data has been evaluated and used to establish a calculation formula to calculate manpower for dismantling equipment of chemical process and calculate manpower for using a green house (GH) which was a temporary structure for preventing the spread of contaminants during dismantling. In the calculation formula to calculate project management data related to dismantling of equipment, the relation of dismantling manpower to each piece of equipment was evaluated. Furthermore, the relation of dismantling manpower to each chemical process was evaluated. The results showed promise for evaluating dismantling manpower with respect to each chemical process. In the calculation formula to calculate project management data related to use of the GH, relations of GH installation manpower and removal manpower to GH footprint were evaluated. Furthermore, the calculation formula for secondary waste generation was established. In this study, project management data related to dismantling of equipment and use of the GH were evaluated and analyzed. The project management data, manpower for dismantling of equipment, manpower for installation and removal of GH, and secondary waste generation from GH were considered

  4. Project management for the decommissioning and dismantling of nuclear facilities; Projektmanagement fuer Stilllegung und Rueckbau kerntechnischer Anlagen

    Energy Technology Data Exchange (ETDEWEB)

    Klasen, Joerg; Wilhelm, Oliver [ENBW Kernkraft GmbH, Neckarwestheim (Germany); Seizer, Burkhard; Schuetz, Tobias [Drees und Sommer, Stuttgart (Germany)

    2015-12-15

    The decommissioning of nuclear power plants is executed in a classic project manner as it is known from other construction projects. It is obvious to use the known portfolio of project management tools. The complexity that is created by the large size of the project in combination with safety requirements of the nuclear industry has to be handled. Complexity can only be managed addressing two main drivers: Prioritization and speed (agility) in project execution. Prioritization can be realized by applying tools like Earned Value Management. A high speed of project execution is established by applying Agile Management like SCRUM-methods. This method is adopted in the context of the cooperation ''Complex Projects'' to the needs of nuclear industry.

  5. Standard Guide for Preparing Waste Management Plans for Decommissioning Nuclear Facilities

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    2010-01-01

    1.1 This guide addresses the development of waste management plans for potential waste streams resulting from decommissioning activities at nuclear facilities, including identifying, categorizing, and handling the waste from generation to final disposal. 1.2 This guide is applicable to potential waste streams anticipated from decommissioning activities of nuclear facilities whose operations were governed by the Nuclear Regulatory Commission (NRC) or Agreement State license, under Department of Energy (DOE) Orders, or Department of Defense (DoD) regulations. 1.3 This guide provides a description of the key elements of waste management plans that if followed will successfully allow for the characterization, packaging, transportation, and off-site treatment or disposal, or both, of conventional, hazardous, and radioactive waste streams. 1.4 This guide does not address the on-site treatment, long term storage, or on-site disposal of these potential waste streams. 1.5 This standard does not purport to address ...

  6. Summary of some Recent Work on Financial Planning for Decommissioning of Nuclear Research Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Lindskog, Staffan (Swedish Nuclear Power Inspectorate, Stockholm (Sweden)); Sjoeblom, Rolf (Tekedo AB, Nykoeping (Sweden))

    2008-06-15

    The new European Union Environmental Liability Directive (ELD) together with the new standard and the increased awareness of the implications of the statements on Environmental liabilities in the IFRS/IA high-light the need for appropriate planning for decommissioning including cost estimations and waste fund management. These new regulations and standards are in some respects more stringent than the strictly nuclear rules. Consequently, The Swedish Nuclear Power Inspectorate has sought communication with non-nuclear actors in the area, including the participation in the recent meeting Environmental Economics and Investment Assessment 11, 27-30 May, 2008, Cadiz, Spain. The present compilation of publications on decommissioning and associated cost calculations in Sweden was prompted by these contacts. The compilation comprises 14 reports published during the last four years

  7. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 13: Part 2, Indexes. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Goins, L.F.; Webb, J.R.; Cravens, C.D.; Mallory, P.K.

    1992-09-01

    This is part 2 of a bibliography on nuclear facility decommissioning and site remedial action. This report contains indexes on the following: authors, corporate affiliation, title words, publication description, geographic location, subject category, and key word.

  8. Technology, Safety and Costs of Decommissioning a Reference Uranium Hexafluoride Conversion Plant

    Energy Technology Data Exchange (ETDEWEB)

    Elder, H. K.

    1981-10-01

    Safety and cost information is developed for the conceptual decommissioning of a commercial uranium hexafluoride conversion (UF{sub 6}) plant. Two basic decommissioning alternatives are studied to obtain comparisons between cost and safety impacts: DECON, and passive SAFSTOR. A third alternative, DECON of the plant and equipment with stabilization and long-term care of lagoon wastes. is also examined. DECON includes the immediate removal (following plant shutdown) of all radioactivity in excess of unrestricted release levels, with subsequent release of the site for public use. Passive SAFSTOR requires decontamination, preparation, maintenance, and surveillance for a period of time after shutdown, followed by deferred decontamination and unrestricted release. DECON with stabilization and long-term care of lagoon wastes (process wastes generated at the reference plant and stored onsite during plant operation} is also considered as a decommissioning method, although its acceptability has not yet been determined by the NRC. The decommissioning methods assumed for use in each decommissioning alternative are based on state-of-the-art technology. The elapsed time following plant shutdown required to perform the decommissioning work in each alternative is estimated to be: for DECON, 8 months; for passive SAFSTOR, 3 months to prepare the plant for safe storage and 8 months to accomplish deferred decontamination. Planning and preparation for decommissioning prior to plant shutdown is estimated to require about 6 months for either DECON or passive SAFSTOR. Planning and preparation prior to starting deferred decontamination is estimated to require an additional 6 months. OECON with lagoon waste stabilization is estimated to take 6 months for planning and about 8 months to perform the decommissioning work. Decommissioning cost, in 1981 dollars, is estimated to be $5.91 million for OECON. For passive SAFSTOR, preparing the facility for safe storage is estimated to cost $0

  9. Establishment the code for prediction of waste volume on NPP decommissioning

    Energy Technology Data Exchange (ETDEWEB)

    Cho, W. H.; Park, S. K.; Choi, Y. D.; Kim, I. S.; Moon, J. K. [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2013-10-15

    In practice, decommissioning waste volume can be estimated appropriately by finding the differences between prediction and actual operation and considering the operational problem or supplementary matters. So in the nuclear developed countries such as U.S. or Japan, the decommissioning waste volume is predicted on the basis of the experience in their own decommissioning projects. Because of the contamination caused by radioactive material, decontamination activity and management of radio-active waste should be considered in decommissioning of nuclear facility unlike the usual plant or facility. As the decommissioning activity is performed repeatedly, data for similar activities are accumulated, and optimal strategy can be achieved by comparison with the predicted strategy. Therefore, a variety of decommissioning experiences are the most important. In Korea, there is no data on the decommissioning of commercial nuclear power plants yet. However, KAERI has accumulated the basis decommissioning data of nuclear facility through decommissioning of research reactor (KRR-2) and uranium conversion plant (UCP). And DECOMMIS(DECOMMissioning Information Management System) was developed to provide and manage the whole data of decommissioning project. Two codes, FAC code and WBS code, were established in this process. FAC code is the one which is classified by decommissioning target of nuclear facility, and WBS code is classified by each decommissioning activity. The reason why two codes where created is that the codes used in DEFACS (Decommissioning Facility Characterization management System) and DEWOCS (Decommissioning Work-unit productivity Calculation System) are different from each other, and they were classified each purpose. DEFACS which manages the facility needs the code that categorizes facility characteristics, and DEWOCS which calculates unit productivity needs the code that categorizes decommissioning waste volume. KAERI has accumulated decommissioning data of KRR

  10. Nuclear facility decommissioning and site remedial actions. Volume 1. A selected bibliography

    Energy Technology Data Exchange (ETDEWEB)

    Faust, R.A.; Fore, C.S.; Knox, N.P.

    1980-09-01

    This bibliography of 633 references represents the first in a series to be produced by the Remedial Actions Program Information Center (RAPIC) containing scientific, technical, economic, and regulatory information concerning the decommissioning of nuclear facilities. Major chapters selected for this bibliography are Facility Decommissioning, Uranium Mill Tailings Cleanup, Contaminated Site Restoration, and Criteria and Standards. The references within each chapter are arranged alphabetically by leading author, corporate affiliation, or title of the document. When the author is not given, the corporate affiliation appears first. If these two levels of authorship are not given, the title of the document is used as the identifying level. Indexes are provided for (1) author(s), (2) keywords, (3) title, (4) technology development, and (5) publication description. An appendix of 123 entries lists recently acquired references relevant to decommissioning of nuclear facilities. These references are also arranged according to one of the four subject categories and followed by author, title, and publication description indexes. The bibliography was compiled from a specialized data base established and maintained by RAPIC to provide information support for the Department of Energy's Remedial Actions Program, under the cosponsorship of its three major components: Surplus Facilities Management Program, Uranium Mill Tailings Remedial Actions Program, and Formerly Utilized Sites Remedial Actions Program. RAPIC is part of the Ecological Sciences Information Center within the Information Center Complex at Oak Ridge National Laboratory.

  11. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 13: Part 1, Main text

    Energy Technology Data Exchange (ETDEWEB)

    Goins, L.F.; Webb, J.R.; Cravens, C.D.; Mallory, P.K.

    1992-09-01

    This publication contains 1035 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions. These citations constitute the thirteenth in a series of reports prepared annually for the US Department of Energy (DOE) Environmental Restoration programs. Citations to foreign and domestic literature of all types. There are 13 major sections of the publication, including: (1) DOE Decontamination and Decommissioning Program; (2) Nuclear Facilities Decommissioning; (3) DOE Formerly Utilized Sites Remedial Action Program; (4) DOE Uranium Mill Tailings Remedial Action Project; (5) Uranium Mill Tailings Management; (6) DOE Environmental Restoration Program; (7) DOE Site-Specific Remedial Actions; (8) Contaminated Site Restoration; (9) Remediation of Contaminated Soil and Groundwater; (10) Environmental Data Measurements, Management, and Evaluation; (11) Remedial Action Assessment and Decision-Making; (12) Technology Development and Evaluation; and (13) Environmental and Waste Management Issues. Bibliographic references are arranged in nine subject categories by geographic location and then alphabetically by first author, corporate affiliation, or publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and key word.

  12. Development of a Multi-Arm Mobile Robot for Nuclear Decommissioning Tasks

    Directory of Open Access Journals (Sweden)

    Mohamed J. Bakari

    2007-12-01

    Full Text Available This paper concerns the design of a two-arm mobile delivery platform for application within nuclear decommissioning tasks. The adoption of the human arm as a model of manoeuvrability, scale and dexterity is the starting point for operation of two seven-function arms within the context of nuclear decommissioning tasks, the selection of hardware and its integration, and the development of suitable control methods. The forward and inverse kinematics for the manipulators are derived and the proposed software architecture identified to control the movements of the arm joints and the performance of selected decommissioning tasks. We discuss the adoption of a BROKK demolition machine as a mobile platform and the integration with its hydraulic system to operate the two seven-function manipulators separately. The paper examines the modelling and development of a real-time control method using Proportional-Integral-Derivative (PID and Proportional-Integral-Plus (PIP control algorithms in the host computer with National Instruments functions and tools to control the manipulators and obtain feedback through wireless communication. Finally we consider the application of a third party device, such as a personal mobile phone, and its interface with LabVIEW software in order to operate the robot arms remotely.

  13. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 12. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    1991-09-01

    The 664 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the twelfth in a series of reports prepared annually for the US Department of Energy Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy Remedial Action Programs. Major sections are (1) Decontamination and Decommissioning Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and key word. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects, analyzes, and disseminates information on environmental restoration and remedial actions. RAPIC staff and resources are available to meet a variety of information needs. Contact the center at FTS 624-7764 or (615) 574-7764.

  14. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 12

    Energy Technology Data Exchange (ETDEWEB)

    Owen, P. T.; Webb, J. R.; Knox, N. P.; Goins, L. F.; Harrell, R. E.; Mallory, P. K.; Cravens, C. D.

    1991-09-01

    The 664 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the twelfth in a series of reports prepared annually for the US Department of Energy Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy Remedial Action Programs. Major sections are (1) Decontamination and Decommissioning Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and key word. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects, analyzes, and disseminates information on environmental restoration and remedial actions. RAPIC staff and resources are available to meet a variety of information needs. Contact the center at FTS 624-7764 or (615) 574-7764.

  15. Development of a Multi-Arm Mobile Robot for Nuclear Decommissioning Tasks

    Directory of Open Access Journals (Sweden)

    Mohamed J. Bakari

    2008-11-01

    Full Text Available This paper concerns the design of a two-arm mobile delivery platform for application within nuclear decommissioning tasks. The adoption of the human arm as a model of manoeuvrability, scale and dexterity is the starting point for operation of two seven-function arms within the context of nuclear decommissioning tasks, the selection of hardware and its integration, and the development of suitable control methods. The forward and inverse kinematics for the manipulators are derived and the proposed software architecture identified to control the movements of the arm joints and the performance of selected decommissioning tasks. We discuss the adoption of a BROKK demolition machine as a mobile platform and the integration with its hydraulic system to operate the two seven-function manipulators separately. The paper examines the modelling and development of a real-time control method using Proportional-Integral-Derivative (PID and Proportional-Integral-Plus (PIP control algorithms in the host computer with National Instruments functions and tools to control the manipulators and obtain feedback through wireless communication. Finally we consider the application of a third party device, such as a personal mobile phone, and its interface with LabVIEW software in order to operate the robot arms remotely.

  16. A State-of-the-Art Report on Technologies of a Safety Assessment and a Radioactivity Exposure Assessment for the Decommissioning Process of Nuclear Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Jeong, Kwan Seong; Kang, Young Ae; Lee, Dong Gyu; Lee, Kune Woo; Jung, Chong Hun

    2007-09-15

    This report is to provide the reference contents of research and development for technologies of radioactivity exposure and safety assessment for development of the decommissioning technology for nuclear facilities. This report consists of as follows: - Analyzing and discussing on state-of-the-art technologies of a radioactivity exposure assessment of a decommissioning for nuclear facilities - Analyzing and discussing on state-of-the-art technologies of a safety assessment of a decommissioning for nuclear facilities.

  17. Study on the financing mechanism and management for decommissioning of nuclear installations in Malaysia

    Energy Technology Data Exchange (ETDEWEB)

    Saleh, Lydia Ilaiza, E-mail: lydiailaiza@gmail.com; Ryong, Kim Tae [KEPCO International Nuclear Graduate School (KINGS) 658-91 Haemaji-ro, Seosaeng-myeon, Ulju-gun, Ulsan 689-882 (Korea, Republic of)

    2015-04-29

    The whole cycle of the decommissioning process development of repository requires the relevant bodies to have a financial system to ensure that it has sufficient funds for its whole life cycle (over periods of many decades). Therefore, the financing mechanism and management system shall respect the following status: the national position, institutional and legislative environment, technical capabilities, the waste origin, ownership, characteristics and inventories. The main objective of the studies is to focus on the cost considerations, alternative funding managements and mechanisms, technical and non-technical factors that may affect the repository life-cycle costs. As a conclusion, the outcomes of this paper is to make a good recommendation and could be applied to the national planners, regulatory body, engineers, or the managers, to form a financial management plan for the decommissioning of the Nuclear Installation.

  18. Study on the financing mechanism and management for decommissioning of nuclear installations in Malaysia

    Science.gov (United States)

    Saleh, Lydia Ilaiza; Ryong, Kim Tae

    2015-04-01

    The whole cycle of the decommissioning process development of repository requires the relevant bodies to have a financial system to ensure that it has sufficient funds for its whole life cycle (over periods of many decades). Therefore, the financing mechanism and management system shall respect the following status: the national position, institutional and legislative environment, technical capabilities, the waste origin, ownership, characteristics and inventories. The main objective of the studies is to focus on the cost considerations, alternative funding managements and mechanisms, technical and non-technical factors that may affect the repository life-cycle costs. As a conclusion, the outcomes of this paper is to make a good recommendation and could be applied to the national planners, regulatory body, engineers, or the managers, to form a financial management plan for the decommissioning of the Nuclear Installation.

  19. Evaluation of activated nuclides for Fugen Nuclear Power Station's decommissioning

    Energy Technology Data Exchange (ETDEWEB)

    Shiratori, Yoshitake; Kawagoe, Shinji; Matsui, Yuji; Higashiura, Norikazu [Japan Nuclear Cycle Development Inst., Tsuruga Head Office, Tsuruga, Fukui (Japan); Iwasaki, Seiji [Nuclear Energy System Inc., Tokyo (Japan)

    2002-09-01

    The density and amount of radioactive nuclides in equipment or concrete including the reactor core need to be evaluated for the decommissioning of the Fugen Nuclear Power Station. To prepare for decommissioning, measurement and evaluation of the neutron flux density have been executed mainly during the reactor operation, because neutron flux density is measured under that condition. Activation evaluation is mainly executed by the calculation method, and the results are checked by the sampling measurements. All of the equipments is divided into three parts, inner core part, shielding part, outer shielding part. The neutron flux distribution of two former parts can be evaluated by calculation, but the last part cannot; it is evaluated by measuring the activation foil for many points. These evaluation methods are checked by a small number of sampling measurements. (author)

  20. General framework and basis of decommissioning of nuclear facilities; Marco general y bases de los desmantelamientos de las instalaciones nucleares

    Energy Technology Data Exchange (ETDEWEB)

    Santiago, J. L.; Martin, N.; Correa, C.

    2013-07-01

    This article summarizes the legal framework defining the strategies, the main activities and the basic responsibilities and roles of the various agents involved in the decommissioning of nuclear facilities in Spain. It also describes briefly the most relevant projects and activities already developed and/or ongoing nowadays, which have positioned Spain within the small group of countries having an integrated and proved experience and know how in this particular field. (Author)

  1. Environmental Problems Associated with Decommissioning of Chernobyl Power Plant Cooling Pond

    Science.gov (United States)

    Foley, T. Q.; Oskolkov, B. Y.; Bondarkov, M. D.; Gashchak, S. P.; Maksymenko, A. M.; Maksymenko, V. M.; Martynenko, V. I.; Jannik, G. T.; Farfan, E. B.; Marra, J. C.

    2009-12-01

    Decommissioning of nuclear power plants and other nuclear fuel cycle facilities associated with residual radioactive contamination is a fairly pressing issue. Significant problems may result from decommissioning of cooling ponds. The Chernobyl Nuclear Power Plant (ChNPP) Cooling Pond is one of the largest self-contained bodies of water in the Chernobyl Region and Ukrainian Polesye with a water surface area of 22.9 km2. The major hydrological feature of the ChNPP Cooling Pond is that its water level is 6-7 m higher than the water level in the Pripyat River and water losses due to seepage and evaporation are replenished by pumping water from the Pripyat River. In 1986, the accident at the ChNPP #4 Reactor Unit significantly contaminated the ChNPP Cooling Pond. According to the 2001 data, the total radionuclide inventory in the ChNPP Cooling Pond bottom deposits was as follows: 16.28 ± 2.59 TBq for 137Cs; 2.4 ± 0.48 TBq for 90Sr, and 0.00518 ± 0.00148 TBq for 239+240Pu. Since ChNPP is being decommissioned, the ChNPP Cooling Pond of such a large size will no longer be needed and cost effective to maintain. However, shutdown of the water feed to the Pond would expose the contaminated bottom deposits and change the hydrological features of the area, destabilizing the radiological and environmental situation in the entire region in 2007 - 2008, in order to assess potential consequences of draining the ChNPP Cooling Pond, the authors conducted preliminary radio-ecological studies of its shoreline ecosystems. The radioactive contamination of the ChNPP Cooling Pond shoreline is fairly variable and ranges from 75 to 7,500 kBq/m2. Three areas with different contamination levels were selected to sample soils, vegetation, small mammals, birds, amphibians, and reptilians in order to measure their 137Cs and 90Sr content. Using the ERICA software, their dose exposures were estimated. For the 2008 conditions, the estimated dose rates were found to be as follows: amphibians - 11

  2. Technology, safety and costs of decommissioning a reference small mixed oxide fuel fabrication plant. Volume 1. Main report

    Energy Technology Data Exchange (ETDEWEB)

    Jenkins, C. E.; Murphy, E. S.; Schneider, K J

    1979-01-01

    Detailed technology, safety and cost information are presented for the conceptual decommissioning of a reference small mixed oxide fuel fabrication plant. Alternate methods of decommissioning are described including immediate dismantlement, safe storage for a period of time followed by dismantlement and entombment. Safety analyses, both occupational and public, and cost evaluations were conducted for each mode.

  3. Determination of 36Cl in nuclear waste from reactor decommissioning

    DEFF Research Database (Denmark)

    Hou, Xiaolin; Frøsig, Lars; Nielsen, Sven Poul

    2007-01-01

    An analytical method for the determination of Cl-36 in nuclear waste such as graphite, heavy concrete, steel, aluminum, and lead was developed. Several methods were investigated for decomposing the samples. AgCl precipitation was used to separate Cl-36 from the matrix elements, followed by ion...... of this analytical method for Cl-36 is 14 mBq. The method has been used to determine Cl-36 in heavy concrete, aluminum, and graphite from the Danish DR-2 research reactor....

  4. Decommissioning Study of Oskarshamn NPP

    Energy Technology Data Exchange (ETDEWEB)

    Larsson, Helena; Anunti, Aake; Edelborg, Mathias [Westinghouse Electric Sweden AB, Vaesteraas (Sweden)

    2013-06-15

    By Swedish law it is the obligation of the nuclear power utilities to satisfactorily demonstrate how a nuclear power plant can be safely decommissioned and dismantled when it is no longer in service as well as calculate the estimated cost of decommissioning of the nuclear power plant. Svensk Kaernbraenslehantering AB (SKB) has been commissioned by the Swedish nuclear power utilities to meet the requirements of current legislation by studying and reporting on suitable technologies and by estimating the costs of decommissioning and dismantling of the Swedish nuclear power plants. The present report is an overview, containing the necessary information to meet the above needs, for Oskarshamn NPP. Information is given for the plant about the inventory of materials and radioactivity at the time for final shutdown. A feasible technique for dismantling is presented and the waste management is described and the resulting waste quantities are estimated. Finally a schedule for the decommissioning phase is given and the costs associated are estimated as a basis for funding.

  5. Decommissioning study of Forsmark NPP

    Energy Technology Data Exchange (ETDEWEB)

    Anunti, Aake; Larsson, Helena; Edelborg, Mathias [Westinghouse Electric Sweden AB, Vaesteraas (Sweden)

    2013-06-15

    By Swedish law it is the obligation of the nuclear power utilities to satisfactorily demonstrate how a nuclear power plant can be safely decommissioned and dismantled when it is no longer in service as well as calculate the estimated cost of decommissioning of the nuclear power plant. Svensk Kaernbraenslehantering AB (SKB) has been commissioned by the Swedish nuclear power utilities to meet the requirements of current legislation by studying and reporting on suitable technologies and by estimating the costs of decommissioning and dismantling of the Swedish nuclear power plants. The present report is an overview, containing the necessary information to meet the above needs, for the Forsmark NPP. Information is given for the plant about the inventory of materials and radioactivity at the time for final shutdown. A feasible technique for dismantling is presented and the waste management is described and the resulting waste quantities are estimated. Finally a schedule for the decommissioning phase is given and the costs associated are estimated as a basis for funding.

  6. Determination of 36Cl in nuclear waste from reactor decommissioning.

    Science.gov (United States)

    Hou, Xiaolin; Ostergaard, Lars Frøsig; Nielsen, Sven P

    2007-04-15

    An analytical method for the determination of 36Cl in nuclear waste such as graphite, heavy concrete, steel, aluminum, and lead was developed. Several methods were investigated for decomposing the samples. AgCl precipitation was used to separate 36Cl from the matrix elements, followed by ion-exchange chromatography to remove interfering radionuclides. The purified 36Cl was then measured by liquid scintillation counting. The chemical yield of chlorine, as measured by ICPMS, is above 70% and the decontamination factors for all interfering radionuclides are greater than 10(6). The detection limit of this analytical method for 36Cl is 14 mBq. The method has been used to determine 36Cl in heavy concrete, aluminum, and graphite from the Danish DR-2 research reactor.

  7. Sellafield Decommissioning Programme - Update and Lessons Learned

    Energy Technology Data Exchange (ETDEWEB)

    Lutwyche, P. R.; Challinor, S. F.

    2003-02-24

    The Sellafield site in North West England has over 240 active facilities covering the full nuclear cycle from fuel manufacture through generation, reprocessing and waste treatment. The Sellafield decommissioning programme was formally initiated in the mid 1980s though several plants had been decommissioned prior to this primarily to create space for other plants. Since the initiation of the programme 7 plants have been completely decommissioned, significant progress has been made in a further 16 and a total of 56 major project phases have been completed. This programme update will explain the decommissioning arrangements and strategies and illustrate the progress made on a number of the plants including the Windscale Pile Chimneys, the first reprocessing plan and plutonium plants. These present a range of different challenges and requiring approaches from fully hands on to fully remote. Some of the key lessons learned will be highlighted.

  8. Development of the Decommissioning Project Management System, DECOMMIS

    Energy Technology Data Exchange (ETDEWEB)

    Chung, U. S.; Park, J. H.; Lee, K. W.; Hwang, D. S.; Park, S. K.; Hwang, S. T.; Paik, S. T.; Choi, Y. D.; Chung, K. H.; Lee, K. I.; Hong, S. B

    2007-03-15

    At the Korea Atomic Energy Research Institute(KAERI), two projects for decommissioning of the research reactors and uranium conversion plant are carried out. The management of the projects can be defined as 'the decision of the changes of the decommissioning methodologies for the more efficient achievement of the project at an adequate time and to an improved method'. The correct decision comes from the experiences on the decommissioning project and the systematic experiences can be obtained from the good management of the decommissioning information. For this, a project management tool, DECOMMIS, was developed in the D and D Technology Division, which has the charge of the decommissioning projects at the KAERI, and its purpose was extended to following fields; generation of reports on the dismantling waste for WACID, record keeping for the next decommissioning projects of nuclear facilities, provision of fundamental data for the R and D of the decommissioning technologies.

  9. Workshop on decommissioning; Seminarium om avveckling

    Energy Technology Data Exchange (ETDEWEB)

    Broden, K. (ed.)

    2005-12-15

    A Nordic workshop on decommissioning of nuclear facilities was held at Risoe in Denmark September 13-15, 2005. The workshop was arranged by NKS in cooperation with the company Danish Decommissioning, DD, responsible for decommissioning of nuclear facilities at Risoe. Oral presentations were made within the following areas: International and national recommendations and requirements concerning decommissioning of nuclear facilities Authority experiences of decommissioning cases Decommissioning of nuclear facilities in Denmark Decommissioning of nuclear facilities in Sweden Plans for decommissioning of nuclear facilities in Norway Plans for decommissioning of nuclear facilities in Finland Decommissioning of nuclear facilities in German and the UK Decommissioning of nuclear facilities in the former Soviet Union Results from research and development A list with proposals for future work within NKS has been prepared based on results from group-work and discussions. The list contains strategic, economical and political issues, technical issues and issues regarding competence and communication. (au)

  10. 26 CFR 1.468A-1T - Nuclear decommissioning costs; general rules (temporary).

    Science.gov (United States)

    2010-04-01

    ... nuclear power plant means any nuclear power reactor that is used predominantly in the trade or business of the furnishing or sale of electric energy. Each unit (that is, nuclear reactor) located on a multi..., systems and components of a nuclear power plant that has permanently ceased the production of...

  11. Nuclear Rocket Facility Decommissioning Project: Controlled Explosive Demolition of Neutron-Activated Shield Wall

    Energy Technology Data Exchange (ETDEWEB)

    Michael R. Kruzic

    2008-06-01

    Located in Area 25 of the Nevada Test Site (NTS), the Test Cell A (TCA) Facility (Figure 1) was used in the early to mid-1960s for testing of nuclear rocket engines, as part of the Nuclear Rocket Development Program, to further space travel. Nuclear rocket testing resulted in the activation of materials around the reactors and the release of fission products and fuel particles. The TCA facility, known as Corrective Action Unit 115, was decontaminated and decommissioned (D&D) from December 2004 to July 2005 using the Streamlined Approach for Environmental Restoration (SAFER) process, under the Federal Facility Agreement and Consent Order. The SAFER process allows environmental remediation and facility closure activities (i.e., decommissioning) to occur simultaneously, provided technical decisions are made by an experienced decision maker within the site conceptual site model. Facility closure involved a seven-step decommissioning strategy. First, preliminary investigation activities were performed, including review of process knowledge documentation, targeted facility radiological and hazardous material surveys, concrete core drilling and analysis, shield wall radiological characterization, and discrete sampling, which proved to be very useful and cost-effective in subsequent decommissioning planning and execution and worker safety. Second, site setup and mobilization of equipment and personnel were completed. Third, early removal of hazardous materials, including asbestos, lead, cadmium, and oil, was performed ensuring worker safety during more invasive demolition activities. Process piping was to be verified void of contents. Electrical systems were de-energized and other systems were rendered free of residual energy. Fourth, areas of high radiological contamination were decontaminated using multiple methods. Contamination levels varied across the facility. Fixed beta/gamma contamination levels ranged up to 2 million disintegrations per minute (dpm)/100

  12. Decommissioning Project for the Research Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Chung, U. S.; Park, J. H.; Paik, S. T. (and others)

    2009-02-15

    In 2008, tried to complete the whole decommissioning project of KRR-1 and KRR-2 and preparing work for memorial museum of KRR-1 reactor. Now the project is delayed for 3 months because of finding unexpected soil contamination around facility and treatment of. To do final residual radioactivity assessment applied by MARSSIM procedure. Accumulated decommissioning experiences and technologies will be very usefully to do decommissioning other nuclear related facility. At the decommissioning site of the uranium conversion plant, the decontamination of the dismantled carbon steel waste are being performed and the lagoon 1 sludge waste is being treated this year. The technologies and experiences obtained from the UCP dismantling works are expected to apply to other fuel cycle facilities decommissioning. The lagoon sludge treatment technology is the first applied technology in the actual field and it is expected that this technology could be applied to other country.

  13. Nuclear facility decommissioning and site remedial actions: A selected bibliography: Volume 8

    Energy Technology Data Exchange (ETDEWEB)

    Owen, P.T.; Michelson, D.C.; Knox, N.P.

    1987-09-01

    The 553 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the eighth in a series of reports. Foreign and domestic literature of all types - technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions - has been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of energy's remedial action program. Major chapters are Surplus Facilities Management Program, Nuclear Facilities Decommissioning, Formerly Utilized Sites Remedial Action Program, Facilities Contaminated with Naturally Occurring Radionuclides, Uranium Mill Tailings Remedial Action Program, Uranium Mill Tailings Management, Technical Measurements Center, and General Remedial Action Program Studies. Chapter sections for chapters 1, 2, 5, and 6 include Design, Planning, and Regulations; Environmental Studies and Site Surveys; Health, Safety, and Biomedical Studies; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, and keywords. The appendix contains a list of frequently used acronyms and abbreviations.

  14. The Optimization of Radioactive Waste Management in the Nuclear Installation Decommissioning Process

    Energy Technology Data Exchange (ETDEWEB)

    Zachar, Matej; Necas, Vladimir [Slovak University of Technology in Bratislava, Faculty of Electrical Engineering and Information Technology, Department of Nuclear Physics and Technology, Ilkovicova 3, 812 19 Bratislava (Slovakia)

    2008-07-01

    The paper presents a basic characterization of nuclear installation decommissioning process especially in the term of radioactive materials management. A large amount of solid materials and secondary waste created after implementation of decommissioning activities have to be managed considering their physical, chemical, toxic and radiological characteristics. Radioactive materials should be, after fulfilling all the conditions defined by the authorities, released to the environment for the further use. Non-releasable materials are considered to be a radioactive waste. Their management includes various procedures starting with pre-treatment activities, continuing with storage, treatment and conditioning procedures. Finally, they are disposed in the near surface or deep geological repositories. Considering the advantages and disadvantages of all possible ways of releasing the material from nuclear installation area, optimization of the material management process should be done. Emphasis is placed on the radiological parameters of materials, availability of waste management technologies, waste repositories and on the radiological limits and conditions for materials release or waste disposal. Appropriate optimization of material flow should lead to the significant savings of money, disposal capacities or raw material resources. Using a suitable calculation code e.g. OMEGA, the evaluation of the various material management scenarios and selection of the best one, based on the multi-criterion analysis, should be done. (authors)

  15. Nuclear facility decommissioning and site remedial actions: a selected bibliography. Volume 5

    Energy Technology Data Exchange (ETDEWEB)

    Owen, P.T.; Knox, N.P.; Chilton, B.D.; Baldauf, M.F.

    1984-09-01

    This bibliography of 756 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions is the fifth in a series of annual reports prepared for the US Department of Energy, Division of Remedial Action Projects. Foreign as well as domestic literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included in this publication. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's Remedial Action Program. Major chapters are: (1) Surplus Facilities Management Program; (2) Nuclear Facilities Decommissioning; (3) Formerly Utilized Sites Remedial Action Program; (4) Uranium Mill Tailings Remedial Action Program; (5) Grand Junction Remedial Action Program; (6) Uranium Mill Tailings Management; and (7) Technical Measurements Center. Chapter sections for chapters 1, 2, 4, and 6 include Design, Planning, and Regulations; Environmental Studies and Site Surveys; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. The references within each chapter or section are arranged alphabetically by leading author. References having no individual author are arranged by corporate author or by title. Indexes are provided for the categories of author, corporate affiliation, title, publication description, geographic location, and keywords. The Appendix contains a list of frequently used acronyms.

  16. Nuclear facility decommissioning and site remedial actions. Volume 6. A selected bibliography

    Energy Technology Data Exchange (ETDEWEB)

    Owen, P.T.; Michelson, D.C.; Knox, N.P.

    1985-09-01

    This bibliography of 683 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions is the sixth in a series of annual reports prepared for the US Department of Energy's Remedial Action Programs. Foreign as well as domestic literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's remedial action program. Major chapters are: (1) Surplus Facilities Management Program; (2) Nuclear Facilities Decommissioning; (3) Formerly Utilized Sites Remedial Action Program; (4) Facilities Contaminated with Natural Radioactivity; (5) Uranium Mill Tailings Remedial Action Program; (6) Grand Junction Remedial Action Program; (7) Uranium Mill Tailings Management; (8) Technical Measurements Center; and (9) General Remedial Action Program Studies. Chapter sections for chapters 1, 2, 5, and 7 include Design, Planning, and Regulations; Environmental Studies and Site Surveys; Health, Safety, and Biomedical Studies; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. The references within each chapter or section are arranged alphabetically by leading author. References having no individual author are arranged by corporate affiliation or by publication description.

  17. Nuclear Power Plants. Revised.

    Science.gov (United States)

    Lyerly, Ray L.; Mitchell, Walter, III

    This publication is one of a series of information booklets for the general public published by the United States Atomic Energy Commission. Among the topics discussed are: Why Use Nuclear Power?; From Atoms to Electricity; Reactor Types; Typical Plant Design Features; The Cost of Nuclear Power; Plants in the United States; Developments in Foreign…

  18. Prioritization methodology for the decommissioning of nuclear facilities: a study case on the Iraq former nuclear complex.

    Science.gov (United States)

    Jarjies, Adnan; Abbas, Mohammed; Monken Fernandes, Horst; Wong, Melanie; Coates, Roger

    2013-05-01

    There are a number of sites in Iraq which have been used for nuclear activities and which contain potentially significant amounts of radioactive waste. The principal nuclear site being Al-Tuwaitha. Many of these sites suffered substantial physical damage during the Gulf Wars and have been subjected to subsequent looting. All require decommissioning in order to ensure both radiological and non-radiological safety. However, it is not possible to undertake the decommissioning of all sites and facilities at the same time. Therefore, a prioritization methodology has been developed in order to aid the decision-making process. The methodology comprises three principal stages of assessment: i) a quantitative surrogate risk assessment ii) a range of sensitivity analyses and iii) the inclusion of qualitative modifying factors. A group of Tuwaitha facilities presented the highest risk among the evaluated ones, followed by a middle ranking grouping of Tuwaitha facilities and some other sites, and a relatively large group of lower risk facilities and sites. The initial order of priority is changed when modifying factors are taken into account. It has to be considered the Iraq's isolation from the international nuclear community over the last two decades and the lack of experienced personnel. Therefore it is appropriate to initiate decommissioning operations on selected low risk facilities at Tuwaitha in order to build capacity and prepare for work to be carried out in more complex and potentially high hazard facilities. In addition it is appropriate to initiate some prudent precautionary actions relating to some of the higher risk facilities. Copyright © 2012 Elsevier Ltd. All rights reserved.

  19. Decommissioning handbook

    Energy Technology Data Exchange (ETDEWEB)

    Manion, W.J.; LaGuardia, T.S.

    1980-11-01

    This document is a compilation of information pertinent to the decommissioning of surplus nuclear facilities. This handbook is intended to describe all stages of the decommissioning process including selection of the end product, estimation of the radioactive inventory, estimation of occupational exposures, description of the state-of-the-art in re decontamination, remote csposition of wastes, and estimation of program costs. Presentation of state-of-the-art technology and data related to decommissioning will aid in consistent and efficient program planning and performance. Particular attention is focused on available technology applicable to those decommissioning activities that have not been accomplished before, such as remote segmenting and handling of highly activated 1100 MW(e) light water reactor vessel internals and thick-walled reactor vessels. A summary of available information associated with the planning and estimating of a decommissioning program is also presented. Summarized in particular are the methodologies associated with the calculation and measurement of activated material inventory, distribution, and surface dose level, system contamination inventory and distribution, and work area dose levels. Cost estimating techniques are also presented and the manner in which to account for variations in labor costs as impacting labor-intensive work activities is explained.

  20. Closing the sky. The total dismantling of the Jose Cabrera nuclear power plant demonstrates maturity in the nuclear sector; Cerrando el Cielo. El desmantelamiento total de la central nuclear Jose Cabrera demustra la madurez del sector nuclear espanol

    Energy Technology Data Exchange (ETDEWEB)

    Rodriguez, A.

    2015-07-01

    This article aims to put the situation of the decommissioning of nuclear power plants in the world into perspective as an already consolidated activity and with an important future of industrial activity. The decommissioning project that Enresa is currently performing in the old Jose Cabrera plant is being explained in detail, by providing data of the newest and most relevant technical aspects as well as the lessons learned to be reusable in other decommissioning projects. The previous background, the project planning, the activities performed and those still to be done as well as their timing are being explained in detail. (Author)

  1. Evaluation of decommissioning alternatives for the Pilot Plant Complex, Aberdeen Proving Ground

    Energy Technology Data Exchange (ETDEWEB)

    Rueda, J.; Zimmerman, R.E.

    1995-09-01

    This report presents an evaluation of four decommissioning alternatives for the Pilot Plant Complex (PPC), an inactive chemical weapons research, development, and production facility consisting of nine buildings located in the Edgewood Area of the Aberdeen Proving Ground in Maryland. Decommissioning the PPC involves six steps: (1) assessing existing conditions; (2) dismantling the aboveground portions of the buildings (including the floor slabs, paved roads, and sidewalks within the PPC); (3) reducing the size of the demolition debris and sealing the debris in containers for later testing and evaluation; (4) testing and evaluating the debris; (5) conducting site operation and maintenance activities; and (6) recycling or disposing of the debris with or without prior treatment, as appropriate.

  2. Nuclear Power Plant Technician

    Science.gov (United States)

    Randall, George A.

    1975-01-01

    The author recognizes a body of basic knowledge in nuclear power plant technoogy that can be taught in school programs, and lists the various courses, aiming to fill the anticipated need for nuclear-trained manpower--persons holding an associate degree in engineering technology. (Author/BP)

  3. Nuclear Power Plant Technician

    Science.gov (United States)

    Randall, George A.

    1975-01-01

    The author recognizes a body of basic knowledge in nuclear power plant technoogy that can be taught in school programs, and lists the various courses, aiming to fill the anticipated need for nuclear-trained manpower--persons holding an associate degree in engineering technology. (Author/BP)

  4. Nuclear facility decommissioning and site remedial actions: A selected bibliography, volume 9

    Energy Technology Data Exchange (ETDEWEB)

    Owen, P.T.; Knox, N.P.; Michelson, D.C.; Turmer, G.S.

    1988-09-01

    The 604 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the ninth in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Foreign and domestic literature of all types--technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions--has been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's remedial action programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) General Remedial Action Program Studies. Subsections for sections 1, 2, 5, and 6 include: Design, Planning, and Regulations; Environmental Studies and Site Surveys; Health, Safety, and Biomedical Studies; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, and keywords. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects and analyzes information on remedial actions and relevant radioactive waste management technologies. RAPIC staff and resources are available to meet a variety of information needs. Contact the center at (615) 576-0568 or FTS 626-0568.

  5. Sorting of waste from the decommissioning of the nuclear facilites at Risoe

    Energy Technology Data Exchange (ETDEWEB)

    Warming, L.; Hedemann Jensen, P.; Soegaard-Hansen, J.; Lauridsen, B. [Risoe National Laboratory, DK-4000 Roskilde (Denmark)

    2003-06-01

    It has been decided to close down and decommission all nuclear facilities at Risoe National Laboratory. The radioactive parts are to be stored in a suitable repository, and the non-radioactive (or very low- radioactive) parts should be carefully checked, before they can be cleared and disposed as ordinary waste. Sorting materials into radioactive and non-radioactive waste is important, as it has both ethical and economical aspects, because the amount of waste to be stored as radioactive waste can be significantly reduced. Every piece of material removed from the nuclear facilities will be marked and registered, so its movements in the decommissioning system can be followed through the documentation. Due to its original position in the facility, it might have been activated by neutrons, contaminated or both. The flow of material through the sorting system is described in detail, from the first check to the final determination of activity content and the subsequent separation into radioactive and non-radioactive waste. There are two reasons for determining the radioactivity. One is to have documentation for the activity content in the radioactive waste to be stored and the other is to verify that the activity content is so low that the piece can be disposed off as ordinary waste. The plan is to have two separate laboratories for these measurements. International organisations have given recommendations on radionuclide specific clearance levels based on a dose rate of 0.01 mSv/y to the most exposed individual. The levels that will be used at Risoe will be in accordance with notices given by the Danish authorities. The whole process of clearance, including the measurements of activity content will be described in detailed procedures. The system will be written up as a QA-system, and the plan is to seek certification. (orig.)

  6. Nuclear facility decommissioning and site remedial actions: a selected bibliography. Volume 4

    Energy Technology Data Exchange (ETDEWEB)

    Owen, P.T.; Knox, N.P.; Fielden, J.M.; Faust, R.A.

    1983-09-01

    This bibliography of 657 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions is the fourth in a series of annual reports prepared for the US Department of Energy, Division of Remedial Action Projects. Foreign as well as domestic documents of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - have been references in this publication. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's Remedial Action Program. Major chapters are: (1) Surplus Facilities Management Program; (2) Nuclear Facilities Decommissioning; (3) Formerly Utilized Sites Remedial Action Program; (4) Uranium Mill Tailings Remedial Action Program; (5) Grand Junction Remedial Action Program; and (6) Uranium Mill Tailings Management. Chapter sections for chapters 1 and 2 include: Design, Planning, and Regulations; Site Surveys; Decontamination Studies; Dismantlement and Demolition; Land Decontamination and Reclamation; Waste Disposal; and General studies. The references within each chapter or section are arranged alphabetically by leading author. References having no individual author are arranged by corporate author, or by title. Indexes are provided for the categories of author, corporate affiliation, title, publication description, geographic location, and keywords. Appendix A lists 264 bibliographic references to literature identified during this reporting period but not abstracted due to time constraints. Title and publication description indexes are given for this appendix. Appendix B defines frequently used acronyms, and Appendix C lists the recipients of this report according to their corporate affiliation.

  7. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Vol. 18. Part 2. Indexes

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-01

    This bibliography contains 3638 citations with abstracts of documents relevant to environmental restoration, nuclear facility decontamination and decommissioning (D&D), uranium mill tailings management, and site remedial actions. This report is the eighteenth in a series of bibliographies prepared annually for the U.S. Department of Energy (DOE) Office of Environmental Restoration. Citations to foreign and domestic literature of all types - technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions - have been included in Part 1 of the report. The bibliography contains scientific, technical, financial, and regulatory information that pertains to DOE environmental restoration programs. The citations are separated by topic into 16 sections, including (1) DOE Environmental Restoration Program; (2) DOE D&D Program; (3) Nuclear Facilities Decommissioning; (4) DOE Formerly Utilized Sites Remedial Action Programs; (5) NORM-Contaminated Site Restoration; (6) DOE Uranium Mill Tailings Remedial Action Project; (7) Uranium Mill Tailings Management; (8) DOE Site-Wide Remedial Actions; (9) DOE Onsite Remedial Action Projects; (10) Contaminated Site Remedial Actions; (11) DOE Underground Storage Tank Remediation; (12) DOE Technology Development, Demonstration, and Evaluations; (13) Soil Remediation; (14) Groundwater Remediation; (15) Environmental Measurements, Analysis, and Decision-Making; and (16) Environmental Management Issues. Within the 16 sections, the citations are sorted by geographic location. If a geographic location is not specified, the citations are sorted according to the document title. In Part 2 of the report, indexes are provided for author, author affiliation, selected title phrase, selected title word, publication description, geographic location, and keyword.

  8. Nuclear Power Plants (Rev.)

    Energy Technology Data Exchange (ETDEWEB)

    Lyerly, Ray L.; Mitchell III, Walter [Southern Nuclear Engineering, Inc.

    1973-01-01

    Projected energy requirements for the future suggest that we must employ atomic energy to generate electric power or face depletion of our fossil-fuel resources—coal, oil, and gas. In short, both conservation and economic considerations will require us to use nuclear energy to generate the electricity that supports our civilization. Until we reach the time when nuclear power plants are as common as fossil-fueled or hydroelectric plants, many people will wonder how the nuclear plants work, how much they cost, where they are located, and what kinds of reactors they use. The purpose of this booklet is to answer these questions. In doing so, it will consider only central station plants, which are those that provide electric power for established utility systems.

  9. Reinforcement course 2013. Challenges at the operation end of nuclear power plants; Vertiefungskurs 2013. Herausforderungen am Betriebsende von Kernkraftwerken

    Energy Technology Data Exchange (ETDEWEB)

    Rey, Matthias [Nuklearforum Schweiz/Forum nucleaire suisse, Bern (Switzerland)

    2014-03-15

    The reinforcement course 2013 of the Nuclear Forum in Switzerland dedicated itself to the question, of which challenges are implicated by decommissioning and dismantling nuclear power plants. The course has been divided into 4 blocks, discussing concepts regarding decommissioning, special points such as organisational or psychological aspects as well as juridical and practical questions. Around 140 persons accepted the invitation of the committee for educational questions under the patronage of Urs Weidmann, head of the nuclear power plant Beznau. Altogether 17 presentations dealt with the following topics: 'Strategies and Steps of Decommissioning' by Roger Lundmark, 'Decommissioning from the Perspective of the Swiss Regulatory Authority' by Hannes Haenggi, 'Operating Period Management Using the Example of the Nuclear Power Plant Leibstadt' by Johannis Noeggerath, 'Questions and Concepts from the Perspective of a Nuclear Power Plant Operator' by Roland Schmidiger, 'Decommissioning of nuclear facilities in the UK' by Andrew Munro, 'Practical experiences of transferring nuclear power plants from operating to out of operation' by Gerd Reinstrom, 'Dismantling of Nuclear Facilities: From the Pilot Scheme to Industrialized Disassembling' by Anke Traichel and Thomas Seipolt, 'Organisational challenges: From Decommissioning Strategy to Decommissioning Targets' by Michael Kruse, Anton von Gunten, Julia Heizinger, Joerg Sokoll, 'Knowing That and Knowing How - Motivational Aspects of Safety-Related Knowledge Management for the Post-Operational phase and dismantling' by Frank Ritz, 'The Juridical Frame of Decommissioning' by Peter Koch, 'The Path to the Decommissioning Order and its Guidelines Ensi-G17' by Torsten Krietsch, 'Requirements for a Safe and Economical Decommissioning From the Perspective of the Operator' by Anton Von Gunten, Michael Kruse, Thomas

  10. Construction, Maintenance and Demolition of Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Smet, Camiel de [Hilti Corporation, P.O. Box 333, FL-9494 Schaan (Liechtenstein)

    2008-07-01

    Hilti is your reliable partner in nuclear power plant construction, maintenance and demolition worldwide. Professional advice and innovative solutions for virtually every phase of construction and supply technologically leading products and systems to increase your productivity and help to create and maintain safe and lasting plants is offered. The solutions for nuclear power plants construction, maintenance and demolition have been employed with great success in many different countries on a wide variety of projects due in no small way to their worldwide availability. An unbroken, international exchange of experience upholds a permanent innovation process. This assures our customers that they always receive products on the very latest technological standard. This paper is not intended to cover all topics related to nuclear power plants. The idea is more to give a kind of an overview. The paper covers briefly the following topics: safety (corrosion and fire), fastenings, measuring and finally decommissioning of nuclear power plants. (author)

  11. KONTEC 2013. 11{sup th} international symposium on 'Conditioning of radioactive operational and decommissioning waste' and 11{sup th} BMBF status report on 'Decommissioning and demolition of nuclear facilities'; KONTEC 2013. 11. internationales Symposium 'Konditionierung radioaktiver Betriebs- und Stilllegungsabfaelle' einschliesslich 11. Statusbericht des BMBF 'Stilllegung und Rueckbau kerntechnischer Anlagen'. Veranstaltungsbericht

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    2013-06-15

    KONTEC 2013 was held in Dresden on 13 to 15 March 2013. The 11{sup th} event organized under this heading dealt with the subjects of 'Conditioning of Radioactive Operational and Decommissioning Waste' and 'Decommissioning and Demolition of Nuclear Facilities' including the R and D Status Report by the Federal Ministry of Education and Research (BMBF) on the same subject. The conference was attended by an international audience from 19 countries. The program included plenary sessions on these 4 key topics: - Disposal of Radioactive Residues from Nuclear Facilities' Operation and Decommissioning. - Decommissioning and Dismantling of Nuclear Facilities. - Facilities and Systems for the Conditioning of Operational and Decommissioning Wastes. - Transport, Interim and Final Storage of Non-heat Generating Wastes (i.e. Konrad). These sessions were accompanied by poster sessions and short presentations under the heading of 'Kontec Direct.' The best presentations of the categories Plenary Session Presentation, Poster Presentation and Kontec-Direct have been awarded. In detail, 'Dismantling of Russian nuclear powered submarines' by Detlef Mietann, 'Requalification of 'Old Packages' for the Konrad Repository Described for the Model Case of Packages from Storage Annex A and Repackaging of Containers Holding Compacts in Hall 2 of the GNS Plant' by Martina Koessler, Sebastian Schwall and Pascal Budriks, and 'Electrochemical process development for cleaning organic, C-14-labelled waste solutions' by Hans-Juergen Friedrich. (orig.)

  12. Risk Management of Large Component in Decommissioning

    Energy Technology Data Exchange (ETDEWEB)

    Nah, Kyung Ku; Kim, Tae Ryong [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of)

    2014-10-15

    The need for energy, especially electric energy, has been dramatically increasing in Korea. Therefore, a rapid growth in nuclear power development has been achieved to have about 30% of electric power production. However, such a large nuclear power generation has been producing a significant amount of radioactive waste and other matters such as safety issue. In addition, owing to the severe accidents at the Fukushima in Japan, public concerns regarding NPP and radiation hazard have greatly increased. In Korea, the operation of KORI 1 has been scheduled to be faced with end of lifetime in several years and Wolsong 1 has been being under review for extending its life. This is the reason why the preparation of nuclear power plant decommissioning is significant in this time. Decommissioning is the final phase in the life-cycle of a nuclear facility and during decommissioning operation, one of the most important management in decommissioning is how to deal with the disused large component. Therefore, in this study, the risk in large component in decommissioning is to be identified and the key risk factor is to be analyzed from where can be prepared to handle decommissioning process safely and efficiently. Developing dedicated acceptance criteria for large components at disposal site was analyzed as a key factor. Acceptance criteria applied to deal with large components like what size of those should be and how to be taken care of during disposal process strongly affect other major works. For example, if the size of large component was not set up at disposal site, any dismantle work in decommissioning is not able to be conducted. Therefore, considering insufficient time left for decommissioning of some NPP, it is absolutely imperative that those criteria should be laid down.

  13. Nuclear Plant Inspection

    Science.gov (United States)

    1983-01-01

    Engineers from the Power Authority of the State of New York use a Crack Growth Analysis Program supplied by COSMIC (Computer Software Management and Information Center) in one stage of nuclear plant inspection. Welds of the nuclear steam supply system are checked for cracks; radiographs, dye penetration and visual inspections are performed to locate cracks in the metal structure and welds. The software package includes three separate crack growth analysis models and enables necessary repairs to be planned before serious problems develop.

  14. 78 FR 79709 - Duke Energy Florida, Inc., Crystal River Unit 3 Nuclear Generating Plant Post-Shutdown...

    Science.gov (United States)

    2013-12-31

    ...] [FR Doc No: 2013-31317] NUCLEAR REGULATORY COMMISSION [Docket No. 50-302; NRC-2013-0283] Duke Energy Florida, Inc., Crystal River Unit 3 Nuclear Generating Plant Post-Shutdown Decommissioning Activities Report AGENCY: Nuclear Regulatory Commission (NRC). ACTION: Notice of receipt; availability; public...

  15. A Decommissioning Information Management System

    Energy Technology Data Exchange (ETDEWEB)

    Park, S. K.; Hong, S. B.; Chung, U. S.; Park, J. H. [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2007-07-01

    In 1996, it was determined that research reactors, the KRR-1 and the KRR-2, would be shut down and dismantled. A project for the decommissioning of these reactors was launched in January 1997 with the goal of a completion by 2008. The total budget of the project was 19.4 million US dollars, including the cost for the waste disposal and for the technology development. The work scopes during the decommissioning project were the dismantling of all the facilities and the removal of all the radioactive materials from the reactor site. After the removal of the entire radioactivity, the site and buildings will be released for an unconditional use. A separate project for the decommissioning of the uranium conversion plant was initiated in 2001. The plant was constructed for the development of the fuel manufacturing technologies and the localization of nuclear fuels in Korea. It was shut downed in 1993 and finally it was concluded in 2000 that the plant would be decommissioned. The project will be completed by 2008 and the total budget was 9.2 million US dollars. During this project, all vessels and equipment will be dismantled and the building surface will be decontaminated to be utilized as general laboratories.

  16. Evaluation on Waste Volume and Weight from Decommissioning of Kori Unit 1 Reactor Vessel

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Yujeong; Lee, Seong-Cheol; Kim, Chang-Lak [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of)

    2015-05-15

    In this paper, the concept of cutting reactor vessel and container for decommissioning Kori unit 1 has been investigated. As a result of the investigation, it is found that cutting the reactor vessel into small pieces, especially for upper and bottom heads of the reactor vessel, is more effective to reduce total disposal volume generated from decommissioning. As a part of continuing efforts to prepare shut down of nuclear power plant, several researches have been conducted to establish plans to dispose decommissioning waste from nuclear power plants. When decommissioning nuclear power plant, most of radioactive waste is generated from primary side including a reactor vessel. Radioactive waste amounts generated from decommissioning is significantly affected by several factors, such as dismantling method, waste classification, reactor lifetime, disposal method and etc.

  17. Plant nuclear envelope proteins.

    Science.gov (United States)

    Rose, Annkatrin; Patel, Shalaka; Meier, Iris

    2004-01-01

    Compared to research in the animal field, the plant NE has been clearly under-investigated. The available data so far indicate similarities as well as striking differences that raise interesting questions about the function and evolution of the NE in different kingdoms. Despite a seemingly similar structure and organization of the NE, many of the proteins that are integral components of the animal NE appear to lack homologues in plant cells. The sequencing of the Arabidopsis genome has not led to the identification of homologues of animal NE components, but has indicated that the plant NE must have a distinct protein composition different from that found in metazoan cells. Besides providing a selective barrier between the nucleoplasm and the cytoplasm, the plant NE functions as a scaffold for chromatin but the scaffolding components are not identical to those found in animal cells. The NE comprises an MTOC in higher plant cells, a striking difference to the organization of microtubule nucleation in other eukaryotic cells. Nuclear pores are present in the plant NE, but identifiable orthologues of most animal and yeast nucleoporins are presently lacking. The transport pathway through the nuclear pores via the action of karyopherins and the Ran cycle is conserved in plant cells. Interestingly, RanGAP is sequestered to the NE in plant cells and animal cells, yet the targeting domains and mechanisms of attachment are different between the two kingdoms. At present, only a few proteins localized at the plant NE have been identified molecularly. Future research will have to expand the list of known protein components involved in building a functional plant NE.

  18. Standard Guide for Evaluating Disposal Options for Concrete from Nuclear Facility Decommissioning

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    2002-01-01

    1.1 This standard guide defines the process for developing a strategy for dispositioning concrete from nuclear facility decommissioning. It outlines a 10-step method to evaluate disposal options for radioactively contaminated concrete. One of the steps is to complete a detailed analysis of the cost and dose to nonradiation workers (the public); the methodology and supporting data to perform this analysis are detailed in the appendices. The resulting data can be used to balance dose and cost and select the best disposal option. These data, which establish a technical basis to apply to release the concrete, can be used in several ways: (1) to show that the release meets existing release criteria, (2) to establish a basis to request release of the concrete on a case-by-case basis, (3) to develop a basis for establishing release criteria where none exists. 1.2 This standard guide is based on the “Protocol for Development of Authorized Release Limits for Concrete at U.S. Department of Energy Sites,” (1) from ...

  19. Decommissioning in Germany. Current status and perspectives; Stilllegung in Deutschland. Status und Perspektiven

    Energy Technology Data Exchange (ETDEWEB)

    Weis, Michael [VGB Power Tech, Essen (Germany)

    2012-11-01

    In 2011 the German government decided as consequence of the Fukushima accident nuclear phase-out. Eight nuclear power plants were shut down, the operating license was withdrawn, nine nuclear power plants are still operated but have a defined shut-down schedule. In view of the NPP companies this decision is contrary to law, the first constitutional complaints were submitted. The decommissioning has not been planned since shortly before lifetime extension has been agreed by the government. A reference concept for the decommissioning and dismantling of nuclear power plants has been developed during the past, the decommissioning and dismantling technology is no more a challenge. The real challenge is the organization of the decommissioning of many plants at the same time, since manpower in the plants, but also in the authorities has to be increased.

  20. Experience Practices on Decontamination Activity in NPP Decommissioning

    Energy Technology Data Exchange (ETDEWEB)

    Yoon, Suk Bon; Kim, Jeongju; Sohn, Wook [Korea Hydro and Nuclear Power Co., Daejeon (Korea, Republic of)

    2016-10-15

    Decommissioning of a nuclear power plant (NPP) involves various technical and administrative activities for a utility to terminate its license, which allows the plant site to be released from the regulatory control (site release). Decontamination activity in NPP decommissioning is one of the main technical activities to be performed during the decommissioning. The decontamination at decommissioning sites is usually performed due to several reasons such as reducing personnel dose and disposal costs, and cleanup to meet license termination requirements by using physical or chemical removal techniques proven through the previous experience practices. This paper introduces the best and worst practices for the decontamination activities collected from the decommissioning operational experiences through the implementation of nuclear decommissioning projects around the world. Review of the experiences of decontamination shows that it is important to conduct an advanced planning for optimized implementation of decontamination taking into considering site specific conditions such as operating time, reactor type, system, and so on. Also, a review of newer decontamination methods is necessary to safely and economically decommission the nuclear facility.

  1. Selection of relevant items for decommissioning costing estimation of a PWR using fuzzy logic

    Energy Technology Data Exchange (ETDEWEB)

    Monteiro, Deiglys Borges; Busse, Alexander Lucas; Moreira, Joao M.L.; Maiorino, Jose Rubens, E-mail: deiglys.monteiro@ufabc.edu.br, E-mail: alexlucasb@gmail.com, E-mail: joao.moreira@ufabc.edu.br, E-mail: joserubens.maiorino@ufabc.edu.br [Universidade Federal do ABC (CECS/UFABC), Santo Andre, SP (Brazil). Centro de Engenharia, Modelagem e Ciencias Aplicadas. Programa de Pos-Graduacao em Energia e Engenharia da Energia

    2015-07-01

    The decommissioning is an important part of a nuclear power plant life cycle which may occur by technical, economical or safety reasons. Decommissioning requires carrying out a large number of tasks that should be planned in advance, involves cost evaluations, preparation of plans of activity and actual operational actions. Despite the large number of tasks, only part of them is relevant for cost estimation purpose. The technical literature and international regulatory agencies suggest a variety of methods for decommissioning cost estimation. Most of them require a very detailed knowledge of the plant and data available suitable for plants that are starting their decommissioning but not for those in the planning stage. The present work aims to apply fuzzy logic to sort out relevant items to cost estimation in order to reduce the work effort involved. The scheme uses parametric equations for specific cost items, and is applied to specific parts of the process of nuclear power plant decommissioning. (author)

  2. Nuclear power plant maintainability.

    Science.gov (United States)

    Seminara, J L; Parsons, S O

    1982-09-01

    In the mid-1970s a general awareness of human factors engineering deficiencies associated with power plant control rooms took shape and the Electric Power Research Institute (EPRI) awarded the Lockheed Corporation a contract to review the human factors aspects of five representative operational control rooms and their associated simulators. This investigation revealed a host of major and minor deficiencies that assumed unforeseen dimensions in the post- Three Mile Island accident period. In the course of examining operational problems (Seminara et al, 1976) and subsequently the methods for overcoming such problems (Seminara et al, 1979, 1980) indications surfaced that power plants were far from ideal in meeting the needs of maintenance personnel. Accordingly, EPRI sponsored an investigation of the human factors aspects of power plant maintainability (Seminara, 1981). This paper provides an overview of the maintainability problems and issues encountered in the course of reviewing five nuclear power plants.

  3. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 13: Part 1, Main text. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Goins, L.F.; Webb, J.R.; Cravens, C.D.; Mallory, P.K.

    1992-09-01

    This publication contains 1035 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions. These citations constitute the thirteenth in a series of reports prepared annually for the US Department of Energy (DOE) Environmental Restoration programs. Citations to foreign and domestic literature of all types. There are 13 major sections of the publication, including: (1) DOE Decontamination and Decommissioning Program; (2) Nuclear Facilities Decommissioning; (3) DOE Formerly Utilized Sites Remedial Action Program; (4) DOE Uranium Mill Tailings Remedial Action Project; (5) Uranium Mill Tailings Management; (6) DOE Environmental Restoration Program; (7) DOE Site-Specific Remedial Actions; (8) Contaminated Site Restoration; (9) Remediation of Contaminated Soil and Groundwater; (10) Environmental Data Measurements, Management, and Evaluation; (11) Remedial Action Assessment and Decision-Making; (12) Technology Development and Evaluation; and (13) Environmental and Waste Management Issues. Bibliographic references are arranged in nine subject categories by geographic location and then alphabetically by first author, corporate affiliation, or publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and key word.

  4. Decommissioning plan - decommissioning project for KRR 1 and 2 (revised)

    Energy Technology Data Exchange (ETDEWEB)

    Jung, K. J.; Paik, S. T.; Chung, U. S.; Jung, K. H.; Park, S. K.; Lee, D. G.; Kim, H. R.; Kim, J. K.; Yang, S. H.; Lee, B. J

    2000-10-01

    This report is the revised Decommissioning Plan for the license of TRIGA research reactor decommissioning project according to Atomic Energy Act No. 31 and No. 36. The decommissioning plan includes the TRIGA reactor facilities, project management, decommissioning method, decontamination and dismantling activity, treatment, packaging, transportation and disposal of radioactive wastes. the report also explained the radiation protection plan and radiation safety management during the decommissioning period, and expressed the quality assurance system during the period and the site restoration after decommissioning. The first decommissioning plan was made by Hyundai Engineering Co, who is the design service company, was submitted to the Ministry of Science and Technology, and then was reviewed by the Korea Institute of Nuclear Safety. The first decommissioning plan was revised including answers for the questions arising from review process.

  5. REVIEW OF INDUSTRIES AND GOVERNMENT AGENCIES FOR TECHNOLOGIES APPLICABLE TO DEACTIVATION AND DECOMMISSIONING OF NUCLEAR WEAPONS FACILITIES

    Energy Technology Data Exchange (ETDEWEB)

    Reilkoff, T. E.; Hetland, M. D.; O' Leary, E. M.

    2002-02-25

    The Deactivation and Decommissioning Focus Area's (DDFA's) mission is to develop, demonstrate, and deploy improved deactivation and decommissioning (D&D) technologies. This mission requires that emphasis be continually placed on identifying technologies currently employed or under development in other nuclear as well as nonnuclear industries and government agencies. In support of DDFA efforts to clean up the U.S. Department of Energy's (DOE's) radiologically contaminated surplus facilities using technologies that improve worker safety, reduce costs, and accelerate cleanup schedules, a study was conducted to identify innovative technologies developed for use in nonnuclear arenas that are appropriate for D&D applications.

  6. Treatment of Decommissioning Combustible Wastes with Incineration Technology

    Energy Technology Data Exchange (ETDEWEB)

    Min, B. Y. Min; Yang, D. S.; Yun, G. S.; Lee, K. W.; Moon, J. K. [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2015-05-15

    The aim of the paper is current status of management for the decommissioning radioactive combustible and metal waste in KAERI. In Korea, two decommissioning projects were carried out for nuclear research facilities (KRR-1 and KRR-2) and a uranium conversion plant (UCP). Through the two decommissioning projects, lots of decommissioning wastes were generated. Decommissioning waste can be divided into radioactive waste and releasable waste. The negative pressure of the incineration chamber remained constant within the specified range. Off-gas flow and temperature were maintained constant or within the desired range. The measures gases and particulate materials in the stack were considerably below the regulatory limits. The achieved average volume reduction ratio during facility operation is about 1/65.

  7. Decommissioning: a United Kingdom perspective

    Energy Technology Data Exchange (ETDEWEB)

    Haworth, A.; Reed, D.L.; Bleeze, A. [Health and Safety Executive, London (United Kingdom)

    1995-12-31

    The paper considers the United Kingdom legislative framework relevant to decommissioning of facilities on nuclear licensed sites. It describes the various legislative bodies involved in regulating this activity and the inspectorate concerned. The licensing regime is described in some detail highlighting the UK arrangements whereby a license is granted for the site upon which nuclear facilities are planned or exist. The license remains in place throughout the life of the plant on the site: from initial planning through to the end of decommissioning. A site (of part of) is not de-licensed until it can be stated that there has ceased to be any danger from ionising radiations from anything on the site (or appropriate part of the site). The final part of the paper considers the changes arising from the commercialization of the nuclear power industry in UK and the restatement of the Nuclear Installation Inspectorate`s policy on decommissioning which has arisen as a result of a review made in response to these changes. (author).

  8. THE DEACTIVATION DECONTAMINATION & DECOMMISSIONING OF THE PLUTONIUM FINISHING PLANT (PFP) A FORMER PLUTONIUM PROCESSING FACILITY AT DOE HANFORD SITE

    Energy Technology Data Exchange (ETDEWEB)

    CHARBONEAU, S.L.

    2006-02-01

    The Plutonium Finishing Plant (PFP) was constructed as part of the Manhattan Project during World War II. The Manhattan Project was developed to usher in the use of nuclear weapons to end the war. The primary mission of the PFP was to provide plutonium used as special nuclear material (SNM) for fabrication of nuclear devices for the war effort. Subsequent to the end of World War II, the PFP's mission expanded to support the Cold War effort through plutonium production during the nuclear arms race and later the processing of fuel grade mixed plutonium-uranium oxide to support DOE's breeder reactor program. In October 1990, at the close of the production mission for PFP, a shutdown order was prepared by the Department of Energy (DOE) in Washington, DC and issued to the Richland DOE field office. Subsequent to the shutdown order, a team from the Defense Nuclear Facilities Safety Board (DNFSB) analyzed the hazards at PFP associated with the continued storage of certain forms of plutonium solutions and solids. The assessment identified many discrete actions that were required to stabilize the different plutonium forms into stable form and repackage the material in high integrity containers. These actions were technically complicated and completed as part of the PFP nuclear material stabilization project between 1995 and early 2005. The completion of the stabilization project was a necessary first step in deactivating PFP. During stabilization, DOE entered into negotiations with the U.S. Environmental Protection Agency (EPA) and the State of Washington and established milestones for the Deactivation and Decommissioning (D&D) of the PFP. The DOE and its contractor, Fluor Hanford (Fluor), have made great progress in deactivating, decontaminating and decommissioning the PFP at the Hanford Site as detailed in this paper. Background information covering the PFP D&D effort includes descriptions of negotiations with the State of Washington concerning consent

  9. Current status of decommissioning projects and their strategies in advanced countries

    Energy Technology Data Exchange (ETDEWEB)

    Chung, U. S.; Lee, K. W.; Hwang, D. S.; Park, S. K.; Hwang, S. T.; Paik, S. T.; Park, J. H.; Choi, Y. D.; Chung, K. H.; Lee, K. I.; Hong, S. B

    2007-06-15

    At the Korea Atomic Energy Research Institute(KAERI), two projects for decommissioning of the research reactors and uranium conversion plant are carried out. The number of nuclear facilities to be dismantled will be much increased in future and the decommissioning industries will be enlarged. Keeping pace with this increasing tendency, each country formulated their own strategies and regulation systems, and applied their own technologies. The international organizations such as the IAEA and the OECD/NEA also prepared standards in technologies and regulation upon decommissioning and recommended to adopt them to the decommissioning projects. These strategies and technologies are very different country by country due to the different site dependent conditions and it will not be reasonable to evaluate their merits and weakness. The world wide status of the decommissioning, highlighted on that of 5 countries of USA, UK, France, Germany and Japan because they are advanced counties in nuclear industries, are summarized and their site specific conditions are evaluated. The scopes of the evaluation are decommissioning strategies, licensing procedures and requirements focused on decommissioning plan, waste management, technology development and so on. The detailed decommissioning progresses of several typical example sites were introduced. The activities on decommissioning field of the international organization, increased according to the enlarged decommissioning industries, are also summarized.

  10. A State of the Art on the Technology for Recycling and Reuse of the Decommissioning Concrete Wastes

    Energy Technology Data Exchange (ETDEWEB)

    Jung, Chung Hun; Choi, Wang Kyu; Min, Byung Youn; Oh, Won Zin; Lee, Kun Woo [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2008-02-15

    This report describes the reduction and recycling technology of decommissioning concrete waste. Decontamination and decommissioning (D and D) becomes one of the most important nuclear markets especially in the developed countries including USA, UK and France where lots of the retired nuclear facilities have been waiting for decommissioning. In our country the KAERI has been carrying out the decommissioning of the retired TRIGA MARK II and III research reactors and an uranium conversion plant as the first national decommissioning project since 1998. One of the most important areas of the decommissioning is a management of a huge amount of a decommissioning waste the cost of which is more than half of the total decommissioning cost. Therefore reduction in decommissioning waste by a reuse or a recycle is an important subject of decommissioning technology development in the world. Recently much countries pay attention to recycle the large amount of concrete dismantling waste resulted from both a nuclear and a non nuclear industries. In our country, much attention was taken in a recycle of concrete dismantling waste as a concrete aggregate, but a little success has been resulted due to the disadvantages such as a weakness of hardness and surface mortar contamination. A recycle in nuclear industry and a self disposal of the radioactively contaminated concrete wastes are main directions of concrete wastes resulted from a nuclear facility decommissioning. In this report it was reviewed the state of art of the related technologies for a reduction and a recycle of concrete wastes from a nuclear decommissioning in the country and abroad. Prior to recycle and reuse in the nuclear sector, however, the regulatory criteria for the recycle and reuse of concrete waste should be established in parallel with the development of the recycling technology.

  11. Lessons Learned for Decommissioning Planning

    Energy Technology Data Exchange (ETDEWEB)

    Sohn, Wook; Kim, Young-gook; Kim, Hee-keun [Korea Hydro and Nuclear Power Co. LTD, Daejeon (Korea, Republic of)

    2015-10-15

    The purpose of this paper is to introduce the U.S. nuclear industrial's some key lessons learned especially for decommissioning planning based on which well informed decommissioning planning can be carried out. For a successful decommissioning, it is crucial to carry out a well-organized decommissioning planning before the decommissioning starts. This paper discussed four key factors which should be decided or considered carefully during the decommissioning planning period with introduction of related decommissioning lessons learned of U.S. nuclear industry. Those factors which have been discussed in this paper include the end state of a site, the overall decommissioning strategy, the management of the spent fuels, and the spent fuel pool island. Among them, the end state of a site should be decided first as it directs the whole decommissioning processes. Then, decisions on the overall decommissioning strategy (DECON vs. SAFSTOR) and the management of the spent fuels (wet vs. dry) should follow. Finally, the spent fuel pool island should be given due consideration because its implementation will result in much cost saving. Hopefully, the results of this paper would provide useful inputs to performing the decommissioning planing for the Kori unit 1.

  12. CONSIDERATIONS FOR THE DEVELOPMENT OF A DEVICE FOR THE DECOMMISSIONING OF THE HORIZONTAL FUEL CHANNELS IN THE CANDU 6 NUCLEAR REACTOR. PART 7 - FUNCTIONING OF THE DECOMMISSIONING DEVICE

    Directory of Open Access Journals (Sweden)

    Gabi ROSCA FARTAT

    2015-05-01

    Full Text Available The scope of this paper is to achieve the device functioning steps for the commissioning of the horizontal fuel channels of calandria vessel. The dismantling of the fuel channel is performed by one device which shall provide radiation protection during the stages of decommissioning, ensuring radiation protection of the workers. For the decommissioning operation design shall be taken to ensure all aspects of security, environmental protection during decommissioning operation steps and creating and implementing work procedures resulting from developed decommissioning plan. The fuel channel decommissioning device is designed for dismantling and extraction of the fuel channel and its components. The decommissioning operation consists of following major steps: platform with device positioning to the fuel channel to be dismantled; coupling and locking the device at the fuel channel; unblock, extract and store the channel closure plug; unblock, extract and store the channel shield plug; block and cut the middle and the end of the pressure tube; block, extract and store the end fitting; block, extract and store the half of pressure tube; mounting of the extended closing plug. The operations steps are performed by the Cutting and Extraction Device and by the extraction actuator from the device handling elements assembly. After each step of dismantling is necessary the confirmation its finalization in order to perform the next operation step. The dismantling operation steps of the fuel channel components are repeated for all the 380 channels of the reactor, from the front of calandria side (plane R as well as the rear side (plane R'.

  13. 76 FR 35511 - Decommissioning Planning

    Science.gov (United States)

    2011-06-17

    ... Planning; Final Rule #0;#0;Federal Register / Vol. 76 , No. 117 / Friday, June 17, 2011 / Rules and... Decommissioning Planning AGENCY: Nuclear Regulatory Commission. ACTION: Final rule. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC or the Commission) is amending its regulations to improve decommissioning planning...

  14. Geoelectrical monitoring of simulated subsurface leakage to support high-hazard nuclear decommissioning at the Sellafield Site, UK

    Energy Technology Data Exchange (ETDEWEB)

    Kuras, Oliver, E-mail: oku@bgs.ac.uk [British Geological Survey, Keyworth, Nottingham NG12 5GG (United Kingdom); Wilkinson, Paul B.; Meldrum, Philip I.; Oxby, Lucy S. [British Geological Survey, Keyworth, Nottingham NG12 5GG (United Kingdom); Uhlemann, Sebastian [British Geological Survey, Keyworth, Nottingham NG12 5GG (United Kingdom); ETH-Swiss Federal Institute of Technology, Institute of Geophysics, Sonneggstr. 5, 8092 Zurich (Switzerland); Chambers, Jonathan E. [British Geological Survey, Keyworth, Nottingham NG12 5GG (United Kingdom); Binley, Andrew [Lancaster Environment Centre, Lancaster University, Lancaster LA1 4YQ (United Kingdom); Graham, James [National Nuclear Laboratory, Central Laboratory, Sellafield, Seascale, Cumbria CA20 1PG (United Kingdom); Smith, Nicholas T. [National Nuclear Laboratory, Central Laboratory, Sellafield, Seascale, Cumbria CA20 1PG (United Kingdom); School of Earth, Atmospheric and Environmental Sciences, Williamson Building, University of Manchester, Oxford Road, Manchester M13 9PL (United Kingdom); Atherton, Nick [Sellafield Ltd, Albion Square, Swingpump Lane, Whitehaven CA28 7NE (United Kingdom)

    2016-10-01

    A full-scale field experiment applying 4D (3D time-lapse) cross-borehole Electrical Resistivity Tomography (ERT) to the monitoring of simulated subsurface leakage was undertaken at a legacy nuclear waste silo at the Sellafield Site, UK. The experiment constituted the first application of geoelectrical monitoring in support of decommissioning work at a UK nuclear licensed site. Images of resistivity changes occurring since a baseline date prior to the simulated leaks revealed likely preferential pathways of silo liquor simulant flow in the vadose zone and upper groundwater system. Geophysical evidence was found to be compatible with historic contamination detected in permeable facies in sediment cores retrieved from the ERT boreholes. Results indicate that laterally discontinuous till units forming localized hydraulic barriers substantially affect flow patterns and contaminant transport in the shallow subsurface at Sellafield. We conclude that only geophysical imaging of the kind presented here has the potential to provide the detailed spatial and temporal information at the (sub-)meter scale needed to reduce the uncertainty in models of subsurface processes at nuclear sites. - Graphical abstract: 3D fractional resistivity change (resistivity change Δρ divided by baseline resistivity ρ{sub 0}) image showing results of Stage 1 silo liquor simulant injection. The black line delineates the preferential flow path; green cylinders show regions of historic contamination found in sediment cores from ERT boreholes. - Highlights: • 4D geoelectrical monitoring at Sellafield detected and tracked simulated silo leaks. • ERT revealed likely pathways of silo liquor simulant flow in the subsurface. • The method can reduce uncertainty in subsurface process models at nuclear sites. • Has been applied in this form at a UK nuclear licensed site for the first time • Study demonstrates value of 4D geophysics for nuclear decommissioning.

  15. Comprehensive engineering and radiation surveys in decommissioning of nuclear power plants КОМПЛЕКСНОЕ ИНЖЕНЕРНОЕ И РАДИАЦИОННОЕ ОБСЛЕДОВАНИЕ В ПРОБЛЕМЕ ВЫВОДА ИЗ ЭКСПЛУАТАЦИИ ЭНЕРГОБЛОКОВ АЭС

    Directory of Open Access Journals (Sweden)

    Engovatov Igor’ Anatol’evich

    2013-01-01

    Full Text Available Comprehensive Engineering and Radiation Surveys (CERS constitute the most important component of the final stage of the life cycle of NPPs, that is, decommissioning of nuclear power plants (NPP.Decommissioning of NPPs is accompanied by specific problems, including radioactive contamination, construction of shields, boxes and rooms, and the so-called residual radioactivity. Although these works account for the 20% of the total amount of work associated with decommissioning, they constitute a fundamental difference between decommissioning of any industrial enterprise and an NPP.Objectives, tasks, scopes and other matters of comprehensive engineering and radiological surveys that accompany the decommissioning of nuclear power plants are discussed by the author. They include:information basis, goals and objectives of CERS within the framework of decommissioning of NPP units;CERS programs;methods and means of engineering surveys;findings of engineering surveys;objectives, tasks and scopes of radiation surveys;methods and means of radiation surveys;findings of radiation surveys;objectives, scopes of application and contents of comprehensive engineering and radiation survey reports required for the decommissioning of NPP units;conclusions and recommendations based on the findings provided in CERS in respect of NPP units.Рассмотрена роль комплексного инженерного и радиационного обследования (КИРО на последней стадии жизненного цикла блоков АЭС — вывода из эксплуатации (ВЭ. Изложены принципы, на которых базируются подходы к проведению КИРО. Приведены цели, задачи, методы и объекты КИРО. Кратко освещены назначение, форма и содержание отчета о комплексном

  16. Nuclear Security for Floating Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Skiba, James M. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Scherer, Carolynn P. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2015-10-13

    Recently there has been a lot of interest in small modular reactors. A specific type of these small modular reactors (SMR,) are marine based power plants called floating nuclear power plants (FNPP). These FNPPs are typically built by countries with extensive knowledge of nuclear energy, such as Russia, France, China and the US. These FNPPs are built in one country and then sent to countries in need of power and/or seawater desalination. Fifteen countries have expressed interest in acquiring such power stations. Some designs for such power stations are briefly summarized. Several different avenues for cooperation in FNPP technology are proposed, including IAEA nuclear security (i.e. safeguards), multilateral or bilateral agreements, and working with Russian design that incorporates nuclear safeguards for IAEA inspections in non-nuclear weapons states

  17. Uranium Determination in Samples from Decommissioning of Nuclear facilities Related to the First Stage of Nuclear Fuel Cycle; Determinacion de Uranio en Muestras Procedentes del Desmantelamiento de Instalaciones de la Primera Parte del Cielo del Combustible Nuclear

    Energy Technology Data Exchange (ETDEWEB)

    Alvarez, A.; Correa, E.; Navarro, N.; Sancho, C. [Ciemat, Madrid (Spain); Angeles, A.

    2000-07-01

    An adequate workplace monitoring must be carried out during the decommissioning activities, to ensure the protection of workers involved in these tasks. In addition, a large amount of waste materials are generated during the decommissioning of nuclear facilities. Clearance levels are established by regulatory authorities and are normally quite low. The determination of those activity concentration levels become more difficult when it is necessary to quantify alpha emitters such as uranium, especially when complex matrices are involved. Several methods for uranium determination in samples obtained during the decommissioning of a facility related to the first stage of the nuclear fuel cycle are presented in this work. Measurements were carried out by laboratory techniques. In situ gamma spectrometry was also used to perform measurements on site. A comparison among the different techniques was also done by analysing the results obtained in some practical applications. (Author)

  18. Nuclear Power Plant

    Directory of Open Access Journals (Sweden)

    Analia Bonelli

    2012-01-01

    Full Text Available A description of the results for a Station Black-Out analysis for Atucha 2 Nuclear Power Plant is presented here. Calculations were performed with MELCOR 1.8.6 YV3165 Code. Atucha 2 is a pressurized heavy water reactor, cooled and moderated with heavy water, by two separate systems, presently under final construction in Argentina. The initiating event is loss of power, accompanied by the failure of four out of four diesel generators. All remaining plant safety systems are supposed to be available. It is assumed that during the Station Black-Out sequence the first pressurizer safety valve fails stuck open after 3 cycles of water release, respectively, 17 cycles in total. During the transient, the water in the fuel channels evaporates first while the moderator tank is still partially full. The moderator tank inventory acts as a temporary heat sink for the decay heat, which is evacuated through conduction and radiation heat transfer, delaying core degradation. This feature, together with the large volume of the steel filler pieces in the lower plenum and a high primary system volume to thermal power ratio, derives in a very slow transient in which RPV failure time is four to five times larger than that of other German PWRs.

  19. Operate a Nuclear Power Plant.

    Science.gov (United States)

    Frimpter, Bonnie J.; And Others

    1983-01-01

    Describes classroom use of a computer program originally published in Creative Computing magazine. "The Nuclear Power Plant" (runs on Apple II with 48K memory) simulates the operating of a nuclear generating station, requiring students to make decisions as they assume the task of managing the plant. (JN)

  20. The calculation and estimation of wastes generated by decommissioning of nuclear facilities. Tokai works and Ningyo-toge Environmental Engineering Center

    Energy Technology Data Exchange (ETDEWEB)

    Ayame, Y.; Tanabe, T.; Takahashi, K.; Takeda, S. [Japan Nuclear Cycle Development Inst., Tokai Works, Waste Management and Fuel Cycle Research Center, Tokai, Ibaraki (Japan)

    2001-07-01

    This investigation was conducted as a part of planning the low-level radioactive waste management program (LLW management program). The aim of this investigation was contributed to compile the radioactive waste database of JNC's LLW management program. All nuclear facilities of the Tokai works and Ningyo-toge Environmental Engineering Center were investigated in this work. The wastes generated by the decommissioning of each nuclear facility were classified into radioactive waste and others (exempt waste and non-radioactive waste), and the amount of the wastes was estimated. The estimated amounts of radioactive wastes generated by decommissioning of the nuclear facilities are as follows. (1) Tokai works: The amount of waste generated by decommissioning of nuclear facilities of the Tokai works is about 1,079,100 ton. The amount of radioactive waste is about 15,400 ton. The amount of exempt waste and non-radioactive waste is about 1,063,700 ton. (2) Ningyo-toge Environmental Engineering Center: The amount of waste generated by decommissioning of nuclear facilities of Ningyo-toge Environmental Engineering Center is about 112,500 ton. The amount of radioactive waste is about 7,800 ton. The amount of exempt waste and non-radioactive waste is about 104,700 ton. (author)

  1. SGDes project. Decommissioning management system of Enresa; Proyecto SGDes. Sistema de Gestion de Desmantelamiento de Enresa

    Energy Technology Data Exchange (ETDEWEB)

    Fernandez Lopez, M.; Julian, A. de

    2013-03-01

    ENRESA, the public company responsible for managing radioactive waste produced in spain and nuclear facilities decommissioning work, has developed a management information system (SGDes) for the decommissioning of nuclear power plants, critical for the company. SGDes system is capable of responding to operational needs for efficient, controlled and secure way. Dismantling activities require a rigorous operations control within highly specialized, process systematization and safety framework, both the human and technological point of view. (Author)

  2. Nuclear Waste Management under Approaching Disaster: A Comparison of Decommissioning Strategies for the German Repository Asse II.

    Science.gov (United States)

    Ilg, Patrick; Gabbert, Silke; Weikard, Hans-Peter

    2016-06-14

    This article compares different strategies for handling low- and medium-level nuclear waste buried in a retired potassium mine in Germany (Asse II) that faces significant risk of uncontrollable brine intrusion and, hence, long-term groundwater contamination. We survey the policy process that has resulted in the identification of three possible so-called decommissioning options: complete backfilling, relocation of the waste to deeper levels in the mine, and retrieval. The selection of a decommissioning strategy must compare expected investment costs with expected social damage costs (economic, environmental, and health damage costs) caused by flooding and subsequent groundwater contamination. We apply a cost minimization approach that accounts for the uncertainty regarding the stability of the rock formation and the risk of an uncontrollable brine intrusion. Since economic and health impacts stretch out into the far future, we examine the impact of different discounting methods and rates. Due to parameter uncertainty, we conduct a sensitivity analysis concerning key assumptions. We find that retrieval, the currently preferred option by policymakers, has the lowest expected social damage costs for low discount rates. However, this advantage is overcompensated by higher expected investment costs. Considering all costs, backfilling is the best option for all discounting scenarios considered.

  3. The SSI regulations on planning before and during decommissioning of nuclear facilities; Foereskrifter om planering infoer och under avveckling av kaerntekniska anlaeggningar

    Energy Technology Data Exchange (ETDEWEB)

    Efraimsson, Henrik; Lund, Ingemar

    2003-09-01

    This report describes the considerations of the SSI in connection with the promulgation of Regulations on planning before and during decommissioning of nuclear facilities (SSI FS 2002:4). A summary of received comments on the issued draft regulations, including judgements of the SSI, is included.

  4. Transfer of financial obligations for the disposal of nuclear waste and decommissioning of German NPP's. Legal aspects of a trust model; Sicherstellung der finanziellen Entsorgungsvorsorge fuer die Stilllegungs- und Rueckbaukosten der deutschen Kernkraftwerke. Rechtliche Randbedingungen eines Stiftungsmodells

    Energy Technology Data Exchange (ETDEWEB)

    Schewe, Markus; Wiesendahl, Stefan [Kuemmerlein Rechtsanwaelte und Notare, Essen (Germany)

    2015-04-15

    The nuclear power plant operators have to bear the costs associated with the closure and the decommissioning of the German nuclear power plants as well as the costs for the disposal of nuclear waste. For that purpose, the operators have to build up sufficient reserves for the decommissioning phase. These reserves at the end of 2013 amounted to approximately 36 billion Euro. Changing this system is discussed very so often. Last in May 2014, a public debate started dealing with the so called trust model (''Stiftungsmodell''). The press published deliberations of several operators to transfer their entire nuclear business to the Federal Republic of Germany. Under this deliberation the current nuclear power plant operations, as well as closure obligations would be contributed to trust. Further, also the reserves should be ''transferred'' to the trust. RAG-Foundation (RAG-Stiftung) - which will assume the financial obligations in connection with Germany's closure of underground coal mining activities - sometimes is cited as a role model. The article covers elements of German trust law and atomic energy law regarding such deliberations. In trust law e.g. it can be debated whether the trust should be established under public or - as in the case of RAG-Foundation - under private law. In this context we will set out the major differences between those two options. In the public law part we will notably address issues arising from individual licensing requirements for nuclear power plants and focus on questions concerning reliability, requisite qualification and organizational structures.

  5. DETAILS OF OPERATIONS PERFORMED BY THE REMOTE CONTROL ROBOT (CONCEPT TO THE HORIZONTAL FUEL CHANNEL DURING DECOMMISSIONING PHASE OF NUCLEAR REACTOR CALANDRIA STRUCTURE. PART I: OUTSIDE OPERATIONS

    Directory of Open Access Journals (Sweden)

    Constantin POPESCU

    2017-05-01

    Full Text Available The authors contribution to this paper is to present a concept solution of a remote control robot (RCR used for the horizontal fuel channels pressure tube decommissioning in the CANDU nuclear reactor. The authors highlight in this paper, few details of geometry, operations, constraints by kinematics and dynamics of the robot movement outside of the reactor fuel channel. Outside operations performed has as the main steps of dismantling process the followings: positioning front of Calandria structure at the fuel channel to be decommissioned, coupling and locking to the End Fitting (EF, sorting and storage extracted items in the safe container. All steps are performed in automatic mode. The remote control robot (RCR represents a safety system controlled by sensors and has the capability to analyze any error registered and decide next activities or abort the outside decommissioning procedure in case of any risk rise in order to ensure the environmental and workers protection.

  6. Nuclear Power Plant Simulation Game.

    Science.gov (United States)

    Weiss, Fran

    1979-01-01

    Presents a nuclear power plant simulation game which is designed to involve a class of 30 junior or senior high school students. Scientific, ecological, and social issues covered in the game are also presented. (HM)

  7. Y-12 Plant Decontamination and Decommissioning Technology Logic Diagram for Building 9201-4. Volume 1: Technology evaluation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-09-01

    During World War 11, the Oak Ridge Y-12 Plant was built as part of the Manhattan Project to supply enriched uranium for weapons production. In 1945, Building 9201-4 (Alpha-4) was originally used to house a uranium isotope separation process based on electromagnetic separation technology. With the startup of the Oak Ridge K-25 Site gaseous diffusion plant In 1947, Alpha-4 was placed on standby. In 1953, the uranium enrichment process was removed, and installation of equipment for the Colex process began. The Colex process--which uses a mercury solvent and lithium hydroxide as the lithium feed material-was shut down in 1962 and drained of process materials. Residual Quantities of mercury and lithium hydroxide have remained in the process equipment. Alpha-4 contains more than one-half million ft{sup 2} of floor area; 15,000 tons of process and electrical equipment; and 23,000 tons of insulation, mortar, brick, flooring, handrails, ducts, utilities, burnables, and sludge. Because much of this equipment and construction material is contaminated with elemental mercury, cleanup is necessary. The goal of the Y-12 Plant Decontamination and Decommissioning Technology Logic Diagram for Building 9201-4 is to provide a planning document that relates decontamination and decommissioning and waste management problems at the Alpha-4 building to the technologies that can be used to remediate these problems. The Y-12 Plant Decontamination and Decommissioning Technology Logic Diagram for Building 9201-4 builds on the methodology transferred by the U.S. Air Force to the Environmental Management organization with DOE and draws from previous technology logic diagram-efforts: logic diagrams for Hanford, the K-25 Site, and ORNL.

  8. KIT competence center for decommissioning. Innovation and promotion of trainees; Kompetenzzentrum Rueckbau am KIT. Nachwuchsfoerderung und Innovationen fuer den Rueckbau

    Energy Technology Data Exchange (ETDEWEB)

    Gentes, Sascha [Karlsruher Institut fuer Technologie (KIT), Karlsruhe (Germany). Inst. fuer Technologie und Management im Baubetrieb

    2016-03-15

    The safe decommissioning of nuclear installations is technically feasible, but is also still a challenge for science, technology and industry. The expertise and know how for decommissioning must be ensured because it will be needed for further decades. Already in 2008 the Karlsruhe Institute of Technology (KIT) had identified this challenge that later emerged through the closure of nuclear power plants in Germany. The KIT opened the professorship Technology and Management of the Decommissioning of Nuclear Installations. In 2014, this section was extended through the dismantling of conventional installations.

  9. Decommissioning samples from the Ft. Lewis, WA, solvent refined coal pilot plant: chemical analysis and biological testing

    Energy Technology Data Exchange (ETDEWEB)

    Weimer, W.C.; Wright, C.W.

    1985-10-01

    This report presents the results from chemical analyses and limited biological assays of three sets of samples from the Ft. Lewis, WA solvent refined coal (SRC) pilot plant. The samples were collected during the process of decommissioning this facility. Chemical composition was determined for chemical class fractions of the samples by using high-resolution gas chromatography (GC), high-resolution GC/mass spectrometry (MS) and high-resolution MS. Biological activity was measuring using both the histidine reversion microbial mutagenicity assay with Salmonella typhimurium, TA98 and an initiation/promotion mouse-skin tumorigenicity assay. 19 refs., 7 figs., 27 tabs.

  10. Preliminary decommissioning plan for Clab (Central interim storage for spent fuels); Preliminaer avvecklingsplan foer Clab

    Energy Technology Data Exchange (ETDEWEB)

    Gatter, Patrik; Wikstroem, Nina [SWECO, Stockholm (Sweden); Hallberg, Bengt [Studsvik Nuclear AB, Nykoeping (Sweden)

    2005-12-15

    In the The Swedish Radiation Protection Authority's Regulations SSI FS 2002:04 and The Swedish Nuclear Power Inspectorate's Regulations SKI FS 2004:1 it is stated that the owner of a nuclear facility must have a preliminary plan for decommissioning of the plant. The present report is a preliminary plan for decommissioning the Central interim storage for spent fuels (Clab). Clab will be decommissioned when all spent fuels and reactor core components have been sent to final disposal. The time for the decommissioning is dependent on the time for phasing out the last Swedish nuclear reactor. At present it is thought that Clab will remain in operation until after year 2050. During the work with this project, nothing has been found that indicates that decommissioning Clab could be more complicated than other plants whose decommissioning is closer in time. On the contrary, smaller radiation doses to the personnel are expected, as well as limited amounts of low and medium activity waste. This plan will be updated and more detailed as the time for decommissioning approaches.

  11. Geoelectrical monitoring of simulated subsurface leakage to support high-hazard nuclear decommissioning at the Sellafield Site, UK.

    Science.gov (United States)

    Kuras, Oliver; Wilkinson, Paul B; Meldrum, Philip I; Oxby, Lucy S; Uhlemann, Sebastian; Chambers, Jonathan E; Binley, Andrew; Graham, James; Smith, Nicholas T; Atherton, Nick

    2016-10-01

    A full-scale field experiment applying 4D (3D time-lapse) cross-borehole Electrical Resistivity Tomography (ERT) to the monitoring of simulated subsurface leakage was undertaken at a legacy nuclear waste silo at the Sellafield Site, UK. The experiment constituted the first application of geoelectrical monitoring in support of decommissioning work at a UK nuclear licensed site. Images of resistivity changes occurring since a baseline date prior to the simulated leaks revealed likely preferential pathways of silo liquor simulant flow in the vadose zone and upper groundwater system. Geophysical evidence was found to be compatible with historic contamination detected in permeable facies in sediment cores retrieved from the ERT boreholes. Results indicate that laterally discontinuous till units forming localized hydraulic barriers substantially affect flow patterns and contaminant transport in the shallow subsurface at Sellafield. We conclude that only geophysical imaging of the kind presented here has the potential to provide the detailed spatial and temporal information at the (sub-)meter scale needed to reduce the uncertainty in models of subsurface processes at nuclear sites.

  12. Development of a new surfactant liquid formulation for TBP removal in reprocessing plants for decommissioning purposes

    Energy Technology Data Exchange (ETDEWEB)

    Fournel, B.; Bisel, I.; Pochon, P.; Delagrange, J.; Fulconis, J.M. [French Atomic Energy Commission, CEA/Siege, 31-33, rue de la Federation, 75752 Paris cedex 15 (France); Causse, J. [Universite de Montpellier, Place Eugene Bataillon 34095 Montpellier Cedex II (France)

    2003-07-01

    CEA has developed in the past years surfactant liquid solutions to remove organic matter located at the surfaces of nuclear components used in reprocessing facilities. These components may be covered with Tributyl Phosphate or products resulting from TBP radiolysis like Dibutyl phosphate or Monobutyl phosphate. These molecules can be combined either with uranium, plutonium or metal ions like zirconium for example. Conventional treatment used for decontamination usually have poor degreasing effect (like sodium hydroxide) so few of these products can be removed successfully. The aim of developing these new treatments is to achieve a better degreasing effect and eliminate sodium ions from the secondary liquid wastes. In a first step, low alkaline formulations have been developed (sodium content about 0,5 M to 1 M). In a second step, it is aimed to remove sodium ions completely, together with keeping a high degreasing efficiency. Another advantage to remove sodium hydroxide from decontamination solutions is to avoid Pu precipitation during the decontamination process. This paper describes the study of a degreasing formulation based on the use of fully soluble low foaming surfactants in nitric acid medium. One presents laboratory scale experiments, experiments on active samples, liquid secondary waste processing, a scale one experiment, and associated basic studies. In conclusion, chemical properties of a surfactant solution in nitric acid medium have been detailed. Aim of the formulation was to remove TBP molecules from metallic surfaces. Efficiency of the treatment was evaluated on inactive and hot samples and compared to more conventional treatments like concentrated sodium hydroxide and pure nitric acid. A micellization of 5,3 g/L of TBP in 0,5 M nitric acid is obtained. This value is about 15 times larger than TBP solubility in acid. The efficiency was found to be higher than that of sodium hydroxide and consequently the risk of Pu and U insolubilization is

  13. ALARA at nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Baum, J.W.

    1990-01-01

    Implementation of the As Low As Reasonably Achievable (ALARA) principle at nuclear power plants presents a continuing challenge for health physicists at utility corporate and plant levels, for plant designers, and for regulatory agencies. The relatively large collective doses at some plants are being addressed though a variety of dose reduction techniques. It is planned that this report will include material on historical aspects, management, valuation of dose reduction, quantitative and qualitative aspects of optimization, design, operational considerations, and training. The status of this work is summarized in this report. 30 refs., 1 fig., 6 tabs.

  14. A State-of-the-Art Report on Cutting Technologies for Decommissioning Nuclear Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Sung Kyun; Lee, Dong Gyu; Lee, Kune Woo; Jung, Chong Hun

    2007-10-15

    This report provides the status of the cryogenic cutting technology as a new dismantling technology for dismantling radioactive nuclear facilities and also presents the direction of study to apply it to a radioactive nuclear facility research aim of its nuclear. This report consists of four chapter : - 1. Background and objectives of dismantling technology for dismantling a radioactive nuclear facility. - 2. Analysis of the status of conventional cutting technologies - 3. Analysis of the status of cryogenic cutting technology - 4. Discussion, conclusion, and future work on state-of-the-art technology of dismantling for nuclear facilities.

  15. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 18. Part 1B: Citations with abstracts, sections 10 through 16

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-01

    This bibliography contains 3,638 citations with abstracts of documents relevant to environmental restoration, nuclear facility decontamination and decommissioning (D and D), uranium mill tailings management, and site remedial actions. The bibliography contains scientific, technical, financial, and regulatory information that pertains to DOE environmental restoration programs. The citations are separated by topic into 16 sections, including (1) DOE Environmental Restoration Program; (2) DOE D and D Program; (3) Nuclear Facilities Decommissioning; (4) DOE Formerly Utilized sites Remedial Action Program; (5) NORM-Contaminated Site Restoration; (6) DOE Uranium Mill Tailings Remedial Action Project; (7) Uranium Mill Tailings Management; (8) DOE Site-Wide Remedial Actions; (9) DOE Onsite Remedial Action Projects; (10) Contaminated Site Remedial Actions; (11) DOE Underground Storage Tank Remediation; (12) DOE Technology Development, Demonstration, and Evaluation; (13) Soil Remediation; (14) Groundwater Remediation; (15) Environmental Measurements, Analysis, and Decision-Making; and (16) Environmental Management Issues.

  16. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 18. Part 1A: Citations with abstracts, sections 1 through 9

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-01

    This bibliography contains 3,638 citations with abstracts of documents relevant to environmental restoration, nuclear facility decontamination and decommissioning (D and D), uranium mill tailings management, and site remedial actions. The bibliography contains scientific, technical, financial, and regulatory information that pertains to DOE environmental restoration programs. The citations are separated by topic into 16 sections, including (1) DOE Environmental Restoration program; (2) DOE D and D Program; (3) Nuclear Facilities Decommissioning; (4) DOE Formerly Utilized Sites Remedial Action Program; (5) NORM-Contaminated Site Restoration; (6) DOE Uranium Mill Tailings Remedial Action Project; (7) Uranium Mill Tailings Management; (8) DOE Site-Wide Remedial Actions; (9) DOE Onsite Remedial Action Projects; (10) Contaminated Site Remedial Actions; (11) DOE Underground Storage Tank Remediation; (12) DOE Technology Development, Demonstration, and Evaluation; (13) Soil Remediation; (14) Groundwater Remediation; (15) Environmental Measurements, Analysis, and Decision-Making; and (16) Environmental Management Issues.

  17. Site decommissioning management plan

    Energy Technology Data Exchange (ETDEWEB)

    Fauver, D.N.; Austin, J.H.; Johnson, T.C.; Weber, M.F.; Cardile, F.P.; Martin, D.E.; Caniano, R.J.; Kinneman, J.D.

    1993-10-01

    The Nuclear Regulatory Commission (NRC) staff has identified 48 sites contaminated with radioactive material that require special attention to ensure timely decommissioning. While none of these sites represent an immediate threat to public health and safety they have contamination that exceeds existing NRC criteria for unrestricted use. All of these sites require some degree of remediation, and several involve regulatory issues that must be addressed by the Commission before they can be released for unrestricted use and the applicable licenses terminated. This report contains the NRC staff`s strategy for addressing the technical, legal, and policy issues affecting the timely decommissioning of the 48 sites and describes the status of decommissioning activities at the sites.

  18. 47{sup th} Annual meeting on nuclear technology (AMNT 2016). Key Topics / Enhanced safety and operation excellence and decommissioning experience and Waste management solutions

    Energy Technology Data Exchange (ETDEWEB)

    Salnikova, Tatiana [AREVA GmbH, Erlangen (Germany); Schaffrath, Andreas [Gesellschaft fuer Anlagen- und Reaktorsicherheit (GRS) gGmbH, Garching (Germany)

    2016-10-15

    Summary report on the Key Topics ''Enhanced Safety and Operation Excellence'' and ''Decommissioning Experience and Waste Management Solutions'' of the 47{sup th} Annual Conference on Nuclear Technology (AMNT 2016) held in Hamburg, 10 to 12 May 2016. Other Sessions of AMNT 2016 have been and will be covered in further issues of atw.

  19. Decontamination and decommissioning of Shippingport commercial reactor

    Energy Technology Data Exchange (ETDEWEB)

    Schreiber, J. [Dept. of Energy, Pittsburgh, PA (United States)

    1989-11-01

    To a certain degree, the decontamination and decommissioning (D and D) of the Shippingport reactor was a joint venture with Duquesne Light Company. The structures that were to be decommissioned were to be removed to at least three feet below grade. Since the land had been leased from Duquesne Light, there was an agreement with them to return the land to them in a radiologically safe condition. The total enclosure volume for the steam and nuclear containment systems was about 1.3 million cubic feet, more than 80% of which was below ground. Engineering plans for the project were started in July of 1980 and the final environmental impact statement (EIS) was published in May of 1982. The plant itself was shut down in October of 1982 for end-of-life testing and defueling. The engineering services portion of the decommissioning plans was completed in September of 1983. DOE moved onto the site and took over from the Navy in September of 1984. Actual physical decommissioning began after about a year of preparation and was completed about 44 months later in July of 1989. This paper describes the main parts of D and D.

  20. Y-12 Plant decontamination and decommissioning technology logic diagram for Building 9201-4. Volume 2: Technology logic diagram

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-09-01

    The Y-12 Plant Decontamination and Decommissioning Technology Logic Diagram for Building 9201-4 (TLD) was developed to provide a decision-support tool that relates decontamination and decommissioning (D and D) problems at Bldg. 9201-4 to potential technologies that can remediate these problems. This TLD identifies the research, development, demonstration, testing, and evaluation needed for sufficient development of these technologies to allow for technology transfer and application to D and D and waste management (WM) activities. It is essential that follow-on engineering studies be conducted to build on the output of this project. These studies will begin by selecting the most promising technologies identified in the TLD and by finding an optimum mix of technologies that will provide a socially acceptable balance between cost and risk. The TLD consists of three fundamentally separate volumes: Vol. 1 (Technology Evaluation), Vol. 2 (Technology Logic Diagram), and Vol. 3 (Technology Evaluation Data Sheets). Volume 2 contains the logic linkages among environmental management goals, environmental problems, and the various technologies that have the potential to solve these problems. Volume 2 has been divided into five sections: Characterization, Decontamination, Dismantlement, Robotics/Automation, and Waste Management. Each section contains logical breakdowns of the Y-12 D and D problems by subject area and identifies technologies that can be reasonably applied to each D and D challenge.

  1. The requirement for proper storage of nuclear and related decommissioning samples to safeguard accuracy of tritium data.

    Science.gov (United States)

    Kim, Daeji; Croudace, Ian W; Warwick, Phillip E

    2012-04-30

    Large volumes of potentially tritium-contaminated waste materials are generated during nuclear decommissioning that require accurate characterisation prior to final waste sentencing. The practice of initially determining a radionuclide waste fingerprint for materials from an operational area is often used to save time and money but tritium cannot be included because of its tendency to be chemically mobile. This mobility demands a specific measurement for tritium and also poses a challenge in terms of sampling, storage and reliable analysis. This study shows that the extent of any tritium redistribution during storage will depend on its form or speciation and the physical conditions of storage. Any weakly or moderately bound tritium (e.g. adsorbed water, waters of hydration or crystallisation) may be variably lost at temperatures over the range 100-300 °C whereas for more strongly bound tritium (e.g. chemically bound or held in mineral lattices) the liberation temperature can be delayed up to 800 °C. For tritium that is weakly held the emanation behaviour at different temperatures becomes particularly important. The degree of (3)H loss and cross-contamination that can arise after sampling and before analysis can be reduced by appropriate storage. Storing samples in vapour tight containers at the point of sampling, the use of triple enclosures, segregating high activity samples and using a freezer all lead to good analytical practice. Copyright © 2012 Elsevier B.V. All rights reserved.

  2. 26 CFR 1.468A-0T - Nuclear decommissioning costs; table of contents.

    Science.gov (United States)

    2010-04-01

    ...) Definitions. (c) Special rules applicable to certain experimental nuclear facilities. § 1.468A-2TTreatment of.... (ii) Definition of administrative costs and expenses. (4) Trust provisions. (b) Prohibitions against.... (3) Use of formula method....

  3. Decommissioning of offshore installations

    Energy Technology Data Exchange (ETDEWEB)

    Oeen, Sigrun; Iversen, Per Erik; Stokke, Reidunn; Nielsen, Frantz; Henriksen, Thor; Natvig, Henning; Dretvik, Oeystein; Martinsen, Finn; Bakke, Gunnstein

    2010-07-01

    New legislation on the handling and storage of radioactive substances came into force 1 January 2011. This version of the report is updated to reflect this new regulation and will therefore in some chapters differ from the Norwegian version (see NEI-NO--1660). The Ministry of the Environment commissioned the Climate and Pollution Agency to examine the environmental impacts associated with the decommissioning of offshore installations (demolition and recycling). This has involved an assessment of the volumes and types of waste material and of decommissioning capacity in Norway now and in the future. This report also presents proposals for measures and instruments to address environmental and other concerns that arise in connection with the decommissioning of offshore installations. At present, Norway has four decommissioning facilities for offshore installations, three of which are currently involved in decommissioning projects. Waste treatment plants of this kind are required to hold permits under the Pollution Control Act. The permit system allows the pollution control authority to tailor the requirements in a specific permit by evaluating conditions and limits for releases of pollutants on a case-to-case basis, and the Act also provides for requirements to be tightened up in line with the development of best available techniques (BAT). The environmental risks posed by decommissioning facilities are much the same as those from process industries and other waste treatment plants that are regulated by means of individual permits. Strict requirements are intended to ensure that environmental and health concerns are taken into account. The review of the four Norwegian decommissioning facilities in connection with this report shows that the degree to which requirements need to be tightened up varies from one facility to another. The permit for the Vats yard is newest and contains the strictest conditions. The Climate and Pollution Agency recommends a number of measures

  4. Nuclear lamina in plant cells

    Institute of Scientific and Technical Information of China (English)

    汪健; 杨澄; 翟中和

    1996-01-01

    By using selective extraction and diethylene glycol distearate (DGD) embedment and embedment-free electron microscopy, the nuclear lamina was demonstrated in carrot and Ginkgo male generative cells. Western blotting revealed that the nuclear lamina was composed of A-type and B-type lamins which contained at least 66-ku and 84-ku or 66-ku and 86-ku polypeptides, respectively. These lamin proteins were localized at the nudear periphery as shown by immunogold-labelling. In situ hybridization for light microscope and electron microscope showed that plant cells have the homologous sequences of animal lamin cDNA. The sorting site of lamin mRNA is mainly distributed in the cytoplasm near the nudear envelope. The data have verified that there indeed exists nudear lamina in plant cells.

  5. Dismantlement of nuclear facilities decommissioned from the Russian navy: Enhancing regulatory supervision of nuclear and radiation safety

    Energy Technology Data Exchange (ETDEWEB)

    Sneve, M.K.

    2013-03-01

    The availability of up to date regulatory norms and standards for nuclear and radiation safety, relevant to the management of nuclear legacy situations, combined with effective and efficient regulatory procedures for licensing and monitoring compliance, are considered to be extremely important. Accordingly the NRPA has set up regulatory cooperation programs with corresponding authorities in the Russian Federation. Cooperation began with the civilian regulatory authorities and was more recently extended to include the military authority and this joint cooperation supposed to develop the regulatory documents to improve supervision over nuclear and radiation safety while managing the nuclear military legacy facilities in Northwest Russia and other regions of the country. (Author)

  6. A study on source term assessment and waste disposal requirement of decontamination and decommissioning for the TRIGA research reactor

    Energy Technology Data Exchange (ETDEWEB)

    Whang, Joo Ho; Lee, Kyung JIn; Lee, Jae Min; Choi, Gyu Seup; Shin, Byoung Sun [Kyunghee Univ., Seoul (Korea, Republic of)

    1999-08-15

    The objective and necessity of the project : TRIGA is the first nuclear facility that decide to decommission and decontamination in our nation. As we estimate the expected life of nuclear power generation at 30 or 40 years, the decommissioning business should be conducted around 2010, and the development of regulatory technique supporting it should be developed previously. From a view of decommissioning and decontamination, the research reactor is just small in scale but it include all decommissioning and decontamination conditions. So, the rules by regulatory authority with decommissioning will be a guide for nuclear power plant in the future. The basis of regulatory technique required when decommissioning the research reactor are the radiological safety security and the data for it. The source term is very important condition not only for security of worker but for evaluating how we dispose the waste is appropriate for conducting the middle store and the procedure after it when the final disposal is considered. The content and the scope in this report contain the procedure of conducting the assessment of the source term which is most important in understanding the general concept of the decommissioning procedure of the decommissioning and decontamination of TRIGA research reactor. That is, the sampling and measuring method is presented as how to measure the volume of the radioactivity of the nuclear facilities. And also, the criterion of classifying the waste occurred in other countries and the site release criteria which is the final step of decommissioning and decontamination presented through MARSSIM. Finally, the program to be applicable through comparing the methods of our nation and other countries ones is presented as plan for disposal of the waste in the decommissioning.

  7. Sabotage at Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Purvis, James W.

    1999-07-21

    Recently there has been a noted worldwide increase in violent actions including attempted sabotage at nuclear power plants. Several organizations, such as the International Atomic Energy Agency and the US Nuclear Regulatory Commission, have guidelines, recommendations, and formal threat- and risk-assessment processes for the protection of nuclear assets. Other examples are the former Defense Special Weapons Agency, which used a risk-assessment model to evaluate force-protection security requirements for terrorist incidents at DOD military bases. The US DOE uses a graded approach to protect its assets based on risk and vulnerability assessments. The Federal Aviation Administration and Federal Bureau of Investigation conduct joint threat and vulnerability assessments on high-risk US airports. Several private companies under contract to government agencies use formal risk-assessment models and methods to identify security requirements. The purpose of this paper is to survey these methods and present an overview of all potential types of sabotage at nuclear power plants. The paper discusses emerging threats and current methods of choice for sabotage--especially vehicle bombs and chemical attacks. Potential consequences of sabotage acts, including economic and political; not just those that may result in unacceptable radiological exposure to the public, are also discussed. Applicability of risk-assessment methods and mitigation techniques are also presented.

  8. Case Study to Apply Work Difficulty Factors to Decommissioning Cost Estimates

    Energy Technology Data Exchange (ETDEWEB)

    Yun, Taesik; Jung, Hyejin; Oh, Jaeyoung; Kim, Younggook [KHNP CRI, Daejeon (Korea, Republic of)

    2016-10-15

    This article is prepared as a guideline regarding how to apply the work difficult factor (WDF) when it comes to the estimates of the decommissioning costs. Although several cases of the decommissioning cost estimates have been made for a few commercial nuclear power plants, the different technical, site-specific economic assumptions used make it difficult to interpret those cost estimates and compare them with that of Kori-1. In addition, it is clear that we are supposed to experience difficulties being created in the process of the Kori-1 and the virtual inaccessibility to the limited areas at the pre-decommissioning stage. Estimating decommissioning costs is one of the most crucial processes since it encompasses all the spectrum of decommissioning activities from the planning to the last evaluation on whether the decommissioning has successfully been proceeded from the safety and economic perspectives. Here I suggested the activity dependent costs is only related to WDFs of the incumbent plant planning or undergone to be decommissioned since as a matter of fact, estimating WDFs is the core process to articulately scrutinize the practical costs to apply to Kori-1 project.

  9. Fukushima Nuclear Power Plant Accident and Nuclear Physicists

    Directory of Open Access Journals (Sweden)

    Otsuka Takaharu

    2014-03-01

    Full Text Available I give an overview on the Fukushima Nuclear Power Plant Accident and a report on voluntary activities of Japanese nuclear physicists in this terrible event, including their major outcome.

  10. The requirement for proper storage of nuclear and related decommissioning samples to safeguard accuracy of tritium data

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Daeji, E-mail: kimdj@kins.re.kr [Korea Institute of Nuclear Safety, 19 Guseong, Yuseong, Daejeon, 303-338 (Korea, Republic of); Croudace, Ian W.; Warwick, Phillip E. [GAU-Radioanalytical, University of Southampton, NOC, European Way, Southampton SO14 3ZH (United Kingdom)

    2012-04-30

    Highlights: Black-Right-Pointing-Pointer Identification of variation in tritium loss rates in concrete samples. Black-Right-Pointing-Pointer Quantification of variation in tritium loss rates under different storage conditions. Black-Right-Pointing-Pointer Quantification of tritium cross-contamination rates for a range of matrix types. Black-Right-Pointing-Pointer Storage strategies for routine waste characterisation involving tritium. - Abstract: Large volumes of potentially tritium-contaminated waste materials are generated during nuclear decommissioning that require accurate characterisation prior to final waste sentencing. The practice of initially determining a radionuclide waste fingerprint for materials from an operational area is often used to save time and money but tritium cannot be included because of its tendency to be chemically mobile. This mobility demands a specific measurement for tritium and also poses a challenge in terms of sampling, storage and reliable analysis. This study shows that the extent of any tritium redistribution during storage will depend on its form or speciation and the physical conditions of storage. Any weakly or moderately bound tritium (e.g. adsorbed water, waters of hydration or crystallisation) may be variably lost at temperatures over the range 100-300 Degree-Sign C whereas for more strongly bound tritium (e.g. chemically bound or held in mineral lattices) the liberation temperature can be delayed up to 800 Degree-Sign C. For tritium that is weakly held the emanation behaviour at different temperatures becomes particularly important. The degree of {sup 3}H loss and cross-contamination that can arise after sampling and before analysis can be reduced by appropriate storage. Storing samples in vapour tight containers at the point of sampling, the use of triple enclosures, segregating high activity samples and using a freezer all lead to good analytical practice.

  11. Sorption (Kd) measurements on cinder block and grout in support of dose assessments for Zion Nuclear Station decommissioning

    Energy Technology Data Exchange (ETDEWEB)

    Milian L.; Sullivan T.

    2014-06-24

    The Zion Nuclear Power Station is being decommissioned. ZionSolutions proposes to leave much of the below grade structures in place and to fill them with a backfill to provide structural support. Backfills under consideration include “clean” concrete demolition debris from the above grade parts of the facility, a flowable grout, cinder block construction debris and sand. A previous study (Yim, 2012) examined the sorption behavior of five nuclides (Fe-55, Co-60, Ni-63, Sr-85, and Cs-137) on concrete and local soils. This study, commissioned by ZionSolutions and conducted by the Brookhaven National Laboratory (BNL) examines the sorption behavior on cinder block and grout materials. Specifically, this study measured the distribution coefficient for four radionuclides of concern using site-groundwater and cinder block from the Zion site and a flowable grout. The distributions coefficient is a measure of the amount of the radionuclide that will remain sorbed to the solid material that is present relative to the amount that will remain in solution. A high distribution coefficient indicates most of the radionuclide will remain on the solid material and will not be available for transport by the groundwater. The radionuclides examined in this set of tests were Co-60, Ni-63, Sr-85, and Cs-137. Tests were performed following ASTM C1733-10, Standard Test Methods for Distribution Coefficients of Inorganic Species by the Batch Method. Sr-85 was used in the testing as an analogue for Sr-90 because it behaves similarly with respect to sorption and has a gamma emission that is easier to detect than the beta emission from Sr-90.

  12. Decommissioning in western Europe; Kaernkraftsavveckling i Vaesteuropa

    Energy Technology Data Exchange (ETDEWEB)

    Lundqvist, K. [Castor arbetslivskonsulter AB, Stockholm (Sweden)

    1999-12-01

    and waterproof conditions for a longer period of time (sometimes hundred years or more), prior to final demolition. Among the reasons for deferring the dismantling are lack of waste repositories and decreasing dose-rates for the workers. Of Europe's 218 commercial reactors in operation, the majority, 151, are located i the Western part. The biggest producers are France, United Kingdom and Germany, with 58, 35 and 20 reactors respectively. Until now mostly research- and pilot reactors have been shut-down. There are yet few experiences from decommissioning of large-scale commercial reactors. The following commercial reactors are undergoing decommissioning. (There are also a great amount of nuclear facilities of other types being decommissioned.) The three gas-cooled twin reactor plants of Berkeley, Trawsfynydd and Hunterston in UK. In Germany Gundremmingen, Lingen, Kahl and Wuergassen are being decommissioned. All of them are located in the Western part of the country. The biggest project is however the dismantling of the gigantic Greifswaldfacility situated on the coast of the Baltic see in former Eastern Germany. The plant has eight Russian built reactors of VVER-type. Like the rest of the former GDR-plants Greifswald was shutdown after the reunification in 1990. The strategy chosen is immediate dismantling. France is decommissioning seven reactors (Chooz A1, Chinon A1, A2, A3, St Laurent A1, A2 and Bugey 1.) The oldest, Chinon A1, closed down in 1973 and the youngest, Bugey 1, in 1994. Italy closed down all NPPs (altogether four) in 1987 after a referendum. The first reactor of the Netherlands was shutdown in 1997 mainly for economical reasons. The development of a free European electricity market will make it less profitable to run certain facilities. Vandelos 1 in Spain is undergoing decommissioning after a fire in the turbines in 1989. IAEA, OECD/NEA and EU are co-operating in the field of decommissioning. Much work is spent on harmonizing rules and preparing

  13. Emptying of the Storage for Solid Radioactive Waste in the Greifswald Nuclear Power Plant

    Energy Technology Data Exchange (ETDEWEB)

    Hartmann, B.; Fischer, J.

    2002-02-26

    On the Greifswald site, 8 WWER 440 reactor units are located and also several facilities to handle fuel and radwaste. After the reunification of Germany, the final decision was taken to decommission all these Russian designed reactors. Thus, EWN is faced with a major decommissioning project in the field of nuclear power stations. One of the major tasks before the dismantling of the plant is the complete disposal of the operational waste. Among other facilities, a store for solid radioactive waste is located on the site, which has been filled over 17 years of operation of units 1 to 4. The paper presents the disposal technology development and results achieved. This activity is the first project in the operational history of the Russian type serial reactor line WWER-440.

  14. Emptying of the Storage for Solid Radioactive Waste in the Greifswald Nuclear Power Plant

    Energy Technology Data Exchange (ETDEWEB)

    Hartmann, B.; Fischer, J.

    2002-02-26

    On the Greifswald site, 8 WWER 440 reactor units are located and also several facilities to handle fuel and radwaste. After the reunification of Germany, the final decision was taken to decommission all these Russian designed reactors. Thus, EWN is faced with a major decommissioning project in the field of nuclear power stations. One of the major tasks before the dismantling of the plant is the complete disposal of the operational waste. Among other facilities, a store for solid radioactive waste is located on the site, which has been filled over 17 years of operation of units 1 to 4. The paper presents the disposal technology development and results achieved. This activity is the first project in the operational history of the Russian type serial reactor line WWER-440.

  15. High-power fiber laser cutting parameter optimization for nuclear decommissioning

    Energy Technology Data Exchange (ETDEWEB)

    Lopez, Ana Beatriz; Assuncao, Eurico; Quintino, Luisa [IDMEC, Instituto Superior Tecnico, Universidade de Lisboa, Lisboa (Portugal); Khan, Ali; Blackbun, Jonathan [TWI Ltd., Cambridge (United States)

    2017-06-15

    For more than 10 years, the laser process has been studied for dismantling work; however, relatively few research works have addressed the effect of high-power fiber laser cutting for thick sections. Since in the nuclear sector, a significant quantity of thick material is required to be cut, this study aims to improve the reliability of laser cutting for such work and indicates guidelines to optimize the cutting procedure, in particular, nozzle combinations (standoff distance and focus position), to minimize waste material. The results obtained show the performance levels that can be reached with 10 kW fiber lasers, using which it is possible to obtain narrower kerfs than those found in published results obtained with other lasers. Nonetheless, fiber lasers appear to show the same effects as those of CO{sub 2} and ND:YAG lasers. Thus, the main factor that affects the kerf width is the focal position, which means that minimum laser spot diameters are advised for smaller kerf widths.

  16. High-power fiber laser cutting parameter optimization for nuclear Decommissioning

    Directory of Open Access Journals (Sweden)

    Ana Beatriz Lopez

    2017-06-01

    Full Text Available For more than 10 years, the laser process has been studied for dismantling work; however, relatively few research works have addressed the effect of high-power fiber laser cutting for thick sections. Since in the nuclear sector, a significant quantity of thick material is required to be cut, this study aims to improve the reliability of laser cutting for such work and indicates guidelines to optimize the cutting procedure, in particular, nozzle combinations (standoff distance and focus position, to minimize waste material. The results obtained show the performance levels that can be reached with 10 kW fiber lasers, using which it is possible to obtain narrower kerfs than those found in published results obtained with other lasers. Nonetheless, fiber lasers appear to show the same effects as those of CO2 and ND:YAG lasers. Thus, the main factor that affects the kerf width is the focal position, which means that minimum laser spot diameters are advised for smaller kerf widths.

  17. Tomorrow's mobile robots in today's nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    McDermott, K.J.; Pavelek, M.D. II; Roman, H.T.

    1986-01-01

    A primary motivation for utilizing robots in nuclear power plants is maintenance economics and the nuclear industry's concern with reducing personnel radiation exposure to as low as reasonably achievable as recommended by the US Nuclear Regulatory Commission (NRC). Recent studies by Battelle Columbus Laboratories, the Electric Power Research Institute, the NRC and others indicate that robots for surveillance and inspection can be retrofitted into existing boiling water reactor and pressurized water reactor plants, but economics must be evaluated on a case-by-case, site-specific basis, because nuclear power plants in the US are usually different in design. Application areas or robot functions being considered are broad and range from primary containment inspection, reactor maintenance, routine health physics tasks, and various operation and maintenance procedures, to facility decontamination and decommissioning, and post-accident recovery such as at Three Mile Island Unit 2. This paper will discuss the general use of robotic devices in nuclear power plants, the pioneering use of robotics technology at Three Mile Island nuclear power plant, and the field testing of mobile robots at Public Service Electric and Gas Company's Salem and Hope Creek nuclear plants.

  18. Proceedings of the US Nuclear Regulatory Commission fifteenth water reactor safety information meeting: Volume 6, Decontamination and decommissioning, accident management, TMI-2

    Energy Technology Data Exchange (ETDEWEB)

    Weiss, A. J. [comp.

    1988-02-01

    This six-volume report contains 140 papers out of the 164 that were presented at the Fifteenth Water Reactor Safety Information Meeting held at the National Bureau of Standards, Gaithersburg, Maryland, during the week of October 26-29, 1987. The papers are printed in the order of their presentation in each session and describe progress and results of programs in nuclear safety research conducted in this country and abroad. This report, Volume 6, discusses decontamination and decommissioning, accident management, and the Three Mile Island-2 reactor accident. Thirteen reports have been cataloged separately.

  19. An analytical approach to γ-ray self-shielding effects for radioactive bodies encountered nuclear decommissioning scenarios.

    Science.gov (United States)

    Gamage, K A A; Joyce, M J

    2011-10-01

    A novel analytical approach is described that accounts for self-shielding of γ radiation in decommissioning scenarios. The approach is developed with plutonium-239, cobalt-60 and caesium-137 as examples; stainless steel and concrete have been chosen as the media for cobalt-60 and caesium-137, respectively. The analytical methods have been compared MCNPX 2.6.0 simulations. A simple, linear correction factor relates the analytical results and the simulated estimates. This has the potential to greatly simplify the estimation of self-shielding effects in decommissioning activities.

  20. Nuclear power plant operation 2016. Pt. 1

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    2017-05-15

    A report is given on the operating results achieved in 2016, events important to plant safety, special and relevant repair, and retrofit measures from nuclear power plants in Germany. Reports about nuclear power plants in Belgium, Finland, the Netherlands, Switzerland, and Spain will be published in a further issue.

  1. From the first nuclear power plant to fourth-generation nuclear power installations [on the 60th anniversary of the World's First nuclear power plant

    Science.gov (United States)

    Rachkov, V. I.; Kalyakin, S. G.; Kukharchuk, O. F.; Orlov, Yu. I.; Sorokin, A. P.

    2014-05-01

    Successful commissioning in the 1954 of the World's First nuclear power plant constructed at the Institute for Physics and Power Engineering (IPPE) in Obninsk signaled a turn from military programs to peaceful utilization of atomic energy. Up to the decommissioning of this plant, the AM reactor served as one of the main reactor bases on which neutron-physical investigations and investigations in solid state physics were carried out, fuel rods and electricity generating channels were tested, and isotope products were bred. The plant served as a center for training Soviet and foreign specialists on nuclear power plants, the personnel of the Lenin nuclear-powered icebreaker, and others. The IPPE development history is linked with the names of I.V. Kurchatov, A.I. Leipunskii, D.I. Blokhintsev, A.P. Aleksandrov, and E.P. Slavskii. More than 120 projects of various nuclear power installations were developed under the scientific leadership of the IPPE for submarine, terrestrial, and space applications, including two water-cooled power units at the Beloyarsk NPP in Ural, the Bilibino nuclear cogeneration station in Chukotka, crawler-mounted transportable TES-3 power station, the BN-350 reactor in Kazakhstan, and the BN-600 power unit at the Beloyarsk NPP. Owing to efforts taken on implementing the program for developing fast-neutron reactors, Russia occupied leading positions around the world in this field. All this time, IPPE specialists worked on elaborating the principles of energy supertechnologies of the 21st century. New large experimental installations have been put in operation, including the nuclear-laser setup B, the EGP-15 accelerator, the large physical setup BFS, the high-pressure setup SVD-2; scientific, engineering, and technological schools have been established in the field of high- and intermediate-energy nuclear physics, electrostatic accelerators of multicharge ions, plasma processes in thermionic converters and nuclear-pumped lasers, physics of compact

  2. SOME RECENT TECHNOLOGY DEVELOPMENTS FROM THE UK'S NATIONAL NUCLEAR LABORATORY TO ENABLE HAZARD CHARACTERISATION FOR NUCLEAR DECOMMISSIONING APPLICATIONS

    Energy Technology Data Exchange (ETDEWEB)

    Farfan, E.; Foley, T.

    2010-02-11

    Under its programme of self investment Internal Research and Development (IR&D), the UK's National Nuclear Laboratory (NNL) is addressing the requirement for development in technology to enable hazard characterisation for nuclear decommissioning applications. Three such examples are described here: (1) RadBall developed by the NNL (patent pending) is a deployable baseball-sized radiation mapping device which can, from a single location, locate and quantify radiation hazards. RadBall offers a means to collect information regarding the magnitude and distribution of radiation in a given cell, glovebox or room to support the development of a safe, cost effective decontamination strategy. RadBall requires no electrical supplies and is relatively small, making it easy to be deployed and used to map radiation hazards in hard to reach areas. Recent work conducted in partnership with the Savannah River National Laboratory (SRNL) is presented. (2) HiRAD (patent pending) has been developed by the NNL in partnership with Tracerco Ltd (UK). HiRAD is a real-time, remotely deployed, radiation detection device designed to operate in elevated levels of radiation (i.e. thousands and tens of thousands of Gray) as seen in parts of the nuclear industry. Like the RadBall technology, the HiRAD system does not require any electrical components, the small dimensions and flexibility of the device allow it to be positioned in difficult to access areas (such as pipe work). HiRAD can be deployed as a single detector, a chain, or as an array giving the ability to monitor large process areas. Results during the development and deployment of the technology are presented. (3) Wireless Sensor Network is a NNL supported development project led by the University of Manchester (UK) in partnership with Oxford University (UK). The project is concerned with the development of wireless sensor network technology to enable the underwater deployment and communication of miniaturised probes allowing pond

  3. SOME RECENT TECHNOLOGY DEVELOPMENTS FROM THE UK'S NATIONAL NUCLEAR LABORATORY TO ENABLE HAZARD CHARACTERISATION FOR NUCLEAR DECOMMISSIONING APPLICATIONS

    Energy Technology Data Exchange (ETDEWEB)

    Farfan, E.; Foley, T.

    2010-02-11

    Under its programme of self investment Internal Research and Development (IR&D), the UK's National Nuclear Laboratory (NNL) is addressing the requirement for development in technology to enable hazard characterisation for nuclear decommissioning applications. Three such examples are described here: (1) RadBall developed by the NNL (patent pending) is a deployable baseball-sized radiation mapping device which can, from a single location, locate and quantify radiation hazards. RadBall offers a means to collect information regarding the magnitude and distribution of radiation in a given cell, glovebox or room to support the development of a safe, cost effective decontamination strategy. RadBall requires no electrical supplies and is relatively small, making it easy to be deployed and used to map radiation hazards in hard to reach areas. Recent work conducted in partnership with the Savannah River National Laboratory (SRNL) is presented. (2) HiRAD (patent pending) has been developed by the NNL in partnership with Tracerco Ltd (UK). HiRAD is a real-time, remotely deployed, radiation detection device designed to operate in elevated levels of radiation (i.e. thousands and tens of thousands of Gray) as seen in parts of the nuclear industry. Like the RadBall technology, the HiRAD system does not require any electrical components, the small dimensions and flexibility of the device allow it to be positioned in difficult to access areas (such as pipe work). HiRAD can be deployed as a single detector, a chain, or as an array giving the ability to monitor large process areas. Results during the development and deployment of the technology are presented. (3) Wireless Sensor Network is a NNL supported development project led by the University of Manchester (UK) in partnership with Oxford University (UK). The project is concerned with the development of wireless sensor network technology to enable the underwater deployment and communication of miniaturised probes allowing pond

  4. Nuclear Power Plant Module, NPP-1: Nuclear Power Cost Analysis.

    Science.gov (United States)

    Whitelaw, Robert L.

    The purpose of the Nuclear Power Plant Modules, NPP-1, is to determine the total cost of electricity from a nuclear power plant in terms of all the components contributing to cost. The plan of analysis is in five parts: (1) general formulation of the cost equation; (2) capital cost and fixed charges thereon; (3) operational cost for labor,…

  5. INTERNATIONAL DECOMMISSIONING SYMPOSIUM 2000

    Energy Technology Data Exchange (ETDEWEB)

    M.A. Ebadian, Ph.D.

    2001-01-01

    The purpose of IDS 2000 was to deliver a world-class conference on applicable global environmental issues. The objective of this conference was to publicize environmental progress of individual countries, to provide a forum for technology developer and problem-holder interaction, to facilitate environmental and technology discussions between the commercial and financial communities, and to accommodate information and education exchange between governments, industries, universities, and scientists. The scope of this project included the planning and execution of an international conference on the decommissioning of nuclear facilities, and the providing of a business forum for vendors and participants sufficient to attract service providers, technology developers, and the business and financial communities. These groups, when working together with attendees from regulatory organizations and government decision-maker groups, provide an opportunity to more effectively and efficiently expedite the decommissioning projects.

  6. NEW MATERIALS DEVELOPED TO MEET REGULATORY AND TECHNICAL REQUIREMENTS ASSOCIATED WITH IN-SITU DECOMMISSIONING OF NUCLEAR REACTORS AND ASSOCIATED FACILITIES

    Energy Technology Data Exchange (ETDEWEB)

    Blankenship, J.; Langton, C.; Musall, J.; Griffin, W.

    2012-01-18

    For the 2010 ANS Embedded Topical Meeting on Decommissioning, Decontamination and Reutilization and Technology, Savannah River National Laboratory's Mike Serrato reported initial information on the newly developed specialty grout materials necessary to satisfy all requirements associated with in-situ decommissioning of P-Reactor and R-Reactor at the U.S. Department of Energy's Savannah River Site. Since that report, both projects have been successfully completed and extensive test data on both fresh properties and cured properties has been gathered and analyzed for a total of almost 191,150 m{sup 3} (250,000 yd{sup 3}) of new materials placed. The focus of this paper is to describe the (1) special grout mix for filling the P-Reactor vessel (RV) and (2) the new flowable structural fill materials used to fill the below grade portions of the facilities. With a wealth of data now in hand, this paper also captures the test results and reports on the performance of these new materials. Both reactors were constructed and entered service in the early 1950s, producing weapons grade materials for the nation's defense nuclear program. R-Reactor was shut down in 1964 and the P-Reactor in 1991. In-situ decommissioning (ISD) was selected for both facilities and performed as Comprehensive Environmental Response, Compensations and Liability Act actions (an early action for P-Reactor and a removal action for R-Reactor), beginning in October 2009. The U.S. Department of Energy concept for ISD is to physically stabilize and isolate intact, structurally robust facilities that are no longer needed for their original purpose of producing (reactor facilities), processing (isotope separation facilities), or storing radioactive materials. Funding for accelerated decommissioning was provided under the American Recovery and Reinvestment Act. Decommissioning of both facilities was completed in September 2011. ISD objectives for these CERCLA actions included: (1) Prevent

  7. Nuclear Power Plant Lifetime Management Study (I)

    Energy Technology Data Exchange (ETDEWEB)

    Hong, Sung Yull; Jeong, Ill Seok; Jang, Chang Heui; Song, Taek Ho; Song, Woo Young [Korea Electric Power Research Institute, Taejon (Korea, Republic of); Jin, Tae Eun [Korea Power Engineering Company Consulting and Architecture Engineers, (Korea, Republic of); Kim, Woo Chul [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1996-12-31

    As the operation-year of nuclear power plant increases and finding sites for new nuclear power plant becomes harder, a comprehensive and systematic nuclear plant lifetime management(PLIM) program including life extension has to be established for stable and safe supply of electricity. A feasibility study was conducted to systematically evaluate technical, economic and regulatory aspect of plant lifetime managements and plant life extension for Kori-1 nuclear power plant. For technical evaluation of nuclear power plant, 13 major components were selected for lifetime evaluation by screening system. structure, and components(SSCs) of the plant. It was found that except reactor pressure vessel, which needs detailed integrity analysis, and low pressure turbine, which is scheduled to be replaced, 11 out of 13 major components have sufficient service life, for more than 40 years. Because domestic rules and regulations related to license renewal has not yet been written, review on the regulatory aspect of life extensions was conducted using US NRC rules and regulations. A cooperative effort with nuclear regulatory body is needed for early completion of license renewal rules and regulations. For economic evaluation of plant lifetime extension, a computer program was developed and used. It was found that 10 to 20 year of extension operation of Kori-1 nuclear power plant was proved. Based on the results, next phase of plant lifetime management program for detailed lifetime evaluation and presenting detailed implementation schedule for plant refurbishment for lifetime extension should be followed. (author). 74 refs., figs.

  8. Planning, organizational and management issues in moving from operation to decommissioning and their impact on waste management; Temas de planificacion, organizacion y gestion asociados con la transicion de la fase operativa a la clausura y su impacto sobre la gestion de residuos

    Energy Technology Data Exchange (ETDEWEB)

    Laraia, M.

    2001-07-01

    The transition from a nuclear facility's operating phase to decommissioning is critical. A number of modifications are required during this period to adapt the facility to new objectives and requirements. There are various activities to prepare for implementation of the decommissioning strategy that may be started before final plant closure or immediately afterwards: these serve to support the decommissioning planning process and ease the burden of operating requirements. (Author)

  9. Development Of Decommissioning Information Management System for 101 HWRR

    Institute of Scientific and Technical Information of China (English)

    Yi Song

    2016-01-01

    Decommissioning of 101 Heavy Water Research Reactor (HWRR) is radioactive and high-risk project which has to consider the effects of radiation and nuclear waste disposal, so the information system covering 101 HWRR decommissioning project must be established to ensure safety of the project. In this study, by col ecting the decommissioning activity data to establish the decommissioning database, and based on the database to develop information management system.

  10. Technology, safety and costs of decommissioning a reference small mixed oxide fuel fabrication plant. Volume 2. Appendices

    Energy Technology Data Exchange (ETDEWEB)

    Jenkins, C. E.; Murphy, E. S.; Schneider, K. J.

    1979-01-01

    Volume 2 contains appendixes on small MOX fuel fabrication facility description, site description, residual radionuclide inventory estimates, decommissioning, financing, radiation dose methodology, general considerations, packaging and shipping of radioactive materials, cost assessment, and safety (JRD)

  11. Decommissioning of offshore installations

    Energy Technology Data Exchange (ETDEWEB)

    Oeen, Sigrun; Iversen, Per Erik; Stokke, Reidunn; Nielsen, Frantz; Henriksen, Thor; Natvig, Henning; Dretvik, Oeystein; Martinsen, Finn; Bakke, Gunnstein

    2010-07-01

    New legislation on the handling and storage of radioactive substances came into force 1 January 2011. This version of the report is updated to reflect this new regulation and will therefore in some chapters differ from the Norwegian version (see NEI-NO--1660). The Ministry of the Environment commissioned the Climate and Pollution Agency to examine the environmental impacts associated with the decommissioning of offshore installations (demolition and recycling). This has involved an assessment of the volumes and types of waste material and of decommissioning capacity in Norway now and in the future. This report also presents proposals for measures and instruments to address environmental and other concerns that arise in connection with the decommissioning of offshore installations. At present, Norway has four decommissioning facilities for offshore installations, three of which are currently involved in decommissioning projects. Waste treatment plants of this kind are required to hold permits under the Pollution Control Act. The permit system allows the pollution control authority to tailor the requirements in a specific permit by evaluating conditions and limits for releases of pollutants on a case-to-case basis, and the Act also provides for requirements to be tightened up in line with the development of best available techniques (BAT). The environmental risks posed by decommissioning facilities are much the same as those from process industries and other waste treatment plants that are regulated by means of individual permits. Strict requirements are intended to ensure that environmental and health concerns are taken into account. The review of the four Norwegian decommissioning facilities in connection with this report shows that the degree to which requirements need to be tightened up varies from one facility to another. The permit for the Vats yard is newest and contains the strictest conditions. The Climate and Pollution Agency recommends a number of measures

  12. Decommissioning of the Nuclear Reactors R2 and R2-0 at Studsvik, Sweden. General Data as called for under Article 37 of the Euratom Treaty

    Energy Technology Data Exchange (ETDEWEB)

    2009-01-15

    This document describes the plans for decommissioning of the nuclear research and material test reactors R2 and R2-0, situated at the Studsvik site close to the city of Nykoeping, Sweden. The purpose of the document is to serve as information for the European Commission, and to fulfil the requirements of Article 37 of the Euratom Treaty. Studsvik is situated on the Baltic coast, about 20 km east of Nykoeping and 80 km southwest of Stockholm. The site comprises the reactors R2 and R2-0 and several facilities for material investigation and radioactive waste treatment and storage. The reactors were used for a number of different purposes from 1960 until June 2005, when they were shut down following a decision by the operator. Decommissioning of the reactor facility is planned to be completed in 2016 after dismantling and conditioning of radioactive parts and demolition of the facility. Solid and liquid radioactive wastes from the dismantling activities will be treated and stored on-site awaiting final disposal. The waste treatment facilities, which are situated in other buildings at the Studsvik site, are planned to continue operation during and after the decommissioning of the reactor facility. All nuclear fuel has been transferred to a separate storage facility and is being shipped to the US according to existing agreements. The objective of the planned dismantling activities is to achieve clearance of the facility to make it possible to either demolish the buildings or use them for other purposes. The operator has divided the planning for dismantling and demolition of the facility into three phases [1]: Dismantling 1, including primary system decontamination, dismantling of the reactors with systems in the reactor pool, draining, cleaning and temporary covering of the reactor pool. This phase has begun and is due to last till approximately December 2009. Dismantling 2, including dismantling of systems in the reactor facility, removal of equipment, radiological

  13. Nuclear Plant/Hydrogen Plant Safety: Issues and Approaches

    Energy Technology Data Exchange (ETDEWEB)

    Steven R. Sherman

    2007-06-01

    The U.S. Department of Energy, through its agents the Next Generation Nuclear Plant Project and the Nuclear Hydrogen Initiative, is working on developing the technologies to enable the large scale production of hydrogen using nuclear power. A very important consideration in the design of a co-located and connected nuclear plant/hydrogen plant facility is safety. This study provides an overview of the safety issues associated with a combined plant and discusses approaches for categorizing, quantifying, and addressing the safety risks.

  14. State of the art review of radioactive waste volume reduction techniques for commercial nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    1980-04-01

    A review is made of the state of the art of volume reduction techniques for low level liquid and solid radioactive wastes produced as a result of: (1) operation of commercial nuclear power plants, (2) storage of spent fuel in away-from-reactor facilities, and (3) decontamination/decommissioning of commercial nuclear power plants. The types of wastes and their chemical, physical, and radiological characteristics are identified. Methods used by industry for processing radioactive wastes are reviewed and compared to the new techniques for processing and reducing the volume of radioactive wastes. A detailed system description and report on operating experiences follow for each of the new volume reduction techniques. In addition, descriptions of volume reduction methods presently under development are provided. The Appendix records data collected during site surveys of vendor facilities and operating power plants. A Bibliography is provided for each of the various volume reduction techniques discussed in the report.

  15. Nuclear power plants for mobile applications

    Science.gov (United States)

    Anderson, J. L.

    1972-01-01

    Mobile nuclear powerplants for applications other than large ships and submarines will require compact, lightweight reactors with especially stringent impact-safety design. The technical and economic feasibility that the broadening role of civilian nuclear power, in general, (land-based nuclear electric generating plants and nuclear ships) can extend to lightweight, safe mobile nuclear powerplants are examined. The paper discusses technical experience, identifies potential sources of technology for advanced concepts, cites the results of economic studies of mobile nuclear powerplants, and surveys future technical capabilities needed by examining the current use and projected needs for vehicles, machines, and habitats that could effectively use mobile nuclear reactor powerplants.

  16. A Prediction on the Unit Cost Estimation for Decommissioning Activities Using the Experienced Data from DECOMMIS

    Energy Technology Data Exchange (ETDEWEB)

    Park, Seung Kook; Park, Hee Seong; Choi, Yoon Dong; Song, Chan Ho; Moon, Jei Kwon [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2014-05-15

    The KAERI (Korea Atomic Energy Research Institute) has developed the DECOMMIS (Decommissioning Information Management System) and have been applied for the decommissioning project of the KRR (Korea Research Reactor)-1 and 2 and UCP (Uranium Conversion Plant), as the meaning of the first decommissioning project in Korea. All information and data which are from the decommissioning activities are input, saved, output and managed in the DECOMMIS. This system was consists of the web server and the database server. The users could be access through a web page, depending on the input, processing and output, and be modified the permissions to do such activities can after the decommissioning activities have created the initial system-wide data is stored. When it could be used the experienced data from DECOMMIS, the cost estimation on the new facilities for the decommissioning planning will be established with the basic frame of the WBS structures and its codes. In this paper, the prediction on the cost estimation through using the experienced data which were store in DECOMMIS was studied. For the new decommissioning project on the nuclear facilities in the future, through this paper, the cost estimation for the decommissioning using the experienced data which were WBS codes, unit-work productivity factors and annual governmental unit labor cost is proposed. These data were from the KRR and UCP decommissioning project. The differences on the WBS code sectors and facility characterization between new objected components and experienced dismantled components was reduces as scaling factors. The study on the establishment the scaling factors and cost prediction for the cost estimation is developing with the algorithms from the productivity data, now.

  17. Revised Analyses of Decommissioning Reference Non-Fuel-Cycle Facilities

    Energy Technology Data Exchange (ETDEWEB)

    MC Bierschbach; DR Haffner; KJ Schneider; SM Short

    2002-12-01

    Cost information is developed for the conceptual decommissioning of non-fuel-cycle nuclear facilities that represent a significant decommissioning task in terms of decontamination and disposal activities. This study is a re-evaluation of the original study (NUREG/CR-1754 and NUREG/CR-1754, Addendum 1). The reference facilities examined in this study are the same as in the original study and include: a laboratory for the manufacture of {sup 3}H-labeled compounds; a laboratory for the manufacture of {sup 14}C-labeled compounds; a laboratory for the manufacture of {sup 123}I-labeled compounds; a laboratory for the manufacture of {sup 137}Cs sealed sources; a laboratory for the manufacture of {sup 241}Am sealed sources; and an institutional user laboratory. In addition to the laboratories, three reference sites that require some decommissioning effort were also examined. These sites are: (1) a site with a contaminated drain line and hold-up tank; (2) a site with a contaminated ground surface; and (3) a tailings pile containing uranium and thorium residues. Decommissioning of these reference facilities and sites can be accomplished using techniques and equipment that are in common industrial use. Essentially the same technology assumed in the original study is used in this study. For the reference laboratory-type facilities, the study approach is to first evaluate the decommissioning of individual components (e.g., fume hoods, glove boxes, and building surfaces) that are common to many laboratory facilities. The information obtained from analyzing the individual components of each facility are then used to determine the cost, manpower requirements and dose information for the decommissioning of the entire facility. DECON, the objective of the 1988 Rulemaking for materials facilities, is the decommissioning alternative evaluated for the reference laboratories because it results in the release of the facility for restricted or unrestricted use as soon as possible. For a

  18. Nuclear reactor kinetics and plant control

    CERN Document Server

    Oka, Yoshiaki

    2013-01-01

    Understanding time-dependent behaviors of nuclear reactors and the methods of their control is essential to the operation and safety of nuclear power plants. This book provides graduate students, researchers, and engineers in nuclear engineering comprehensive information on both the fundamental theory of nuclear reactor kinetics and control and the state-of-the-art practice in actual plants, as well as the idea of how to bridge the two. The first part focuses on understanding fundamental nuclear kinetics. It introduces delayed neutrons, fission chain reactions, point kinetics theory, reactivit

  19. Safety Assessment of Low-Contaminated Equipment Dismantling at Nuclear Power Plants

    Directory of Open Access Journals (Sweden)

    Egidijus Babilas

    2015-01-01

    Full Text Available The decommissioning of nuclear facilities requires adequate planning and demonstration that dismantling and decontamination activities can be conducted safely. Existing safety standards require that an appropriate safety assessment be performed to support the decommissioning plan for each facility (International Atomic Energy Agency, 2006. This paper presents safety assessment approach used in Lithuania during the development of the first dismantling and decontamination project for Ignalina NPP. The paper will mainly focus on the identification and assessment of the hazards raised due to dismantling and decontamination activities at Ignalina Nuclear Power Plant and on the assessment of the nonradiological and radiological consequences of the indicated most dangerous initiating event. The drop of heavy item was indicated as one of most dangerous initiating events for the discussed Ignalina Nuclear Power Plant dismantling and decontamination project. For the analysis of the nonradiological impact the finite element model for the load drop force calculation was developed. The radiological impact was evaluated in those accident cases which would lead to the worst radiological consequences. The assessments results show that structural integrity of the building and supporting columns of building structures will be maintained and radiological consequences are lower than the annual regulatory operator dose limit.

  20. General data relating to the arrangements for disposal of radioactive waste required under Article 37 of the Euratom Treaty. Decommissioning of the nuclear facilities at Risoe National Laboratory, Denmark

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-03-01

    This document submitted by the Danish Government has been produced to satisfy the requirements of Article 37 of the Euratom Treaty as recommended by the Commission of the European Communities (Annex 2 of Commission Recommendation 1999/829/Euratom of 6 December 1999). The above Recommendations include the dismantling of nuclear reactors and reprocessing plants in the list of operations to which Article 37 applies. Under paragraph 5.1 of the Recommendation, a submission of General Data in respect of such dismantling operations is only necessary when the proposed authorised limits and other requirements are less restrictive than those in force when the plant was operational. However, in the case of Risoe National Laboratory, no previous submission of general data has been made under Article 37 and no Opinion given by the Commission on a plan for the disposal of radioactive waste. For this reason, general data are submitted in respect of the proposed dismantling operations, even though no change to a less restrictive authorisation is envisaged at this time. This submission is for the decommissioning of the nuclear facilities at Risoe National Laboratory, which are owned by the Danish Government and managed by a Board of Governors for the Ministry of Science, Technology and Innovation. (BA)

  1. CONSIDERATIONS FOR THE DEVELOPMENT OF A DEVICE FOR THE DECOMMISSIONING OF THE HORIZONTAL FUEL CHANNELS IN THE CANDU 6 NUCLEAR REACTOR. PART 10 - PRESENTATION OF THE DECOMMISSIONING DEVICE OPERATING

    Directory of Open Access Journals (Sweden)

    Constantin D. STANESCU,

    2015-05-01

    Full Text Available This paper presents a solution proposed by the authors in order to achieve of a cutting and extracting device operating panel for the decommissioning of the horizontal fuel channels in the CANDU 6 nuclear reactor. The Cutting and Extraction Device (CED is fully automated, connected by wires to a Programmable Logic Controller (PLC and controlled from a Human Machine Interface (HMI. The Cutting and Extraction Device (CED performs the dismantling, cutting and extraction of the fuel channel components, moving with variable speed, temperature monitoring and video surveillance inside the pipe, unblock and extract the channel closure plug (from End Fitting - EF, unblock and extract the channel shield plug (from Lattice Tube - LT, block and cut the middle of the pressure tube, block and cut the end of the pressure tube, block and extract the half of pressure tube. All operations can be monitored and controlled from a operating panel. The PLC fully command the device in automatic or manually mode, to control the internal sensors, transducers, electrical motors, video surveillance and pyrometers for monitoring cutting place temperature. The device controller has direct access to the measured values with these sensors, interprets and processes them, preparing the next actionafter confirming the action in progress. The design of the Cutting and Extraction Device (CED shall be achieved according to the particular features of the fuel channel components to be dismantled and to ensure radiation protection of workers.

  2. NMSS handbook for decommissioning fuel cycle and materials licensees

    Energy Technology Data Exchange (ETDEWEB)

    Orlando, D.A.; Hogg, R.C.; Ramsey, K.M. [and others

    1997-03-01

    The US Nuclear Regulatory Commission amended its regulations to set forth the technical and financial criteria for decommissioning licensed nuclear facilities. These regulations were further amended to establish additional recordkeeping requirements for decommissioning; to establish timeframes and schedules for the decommissioning; and to clarify that financial assurance requirements must be in place during operations and updated when licensed operations cease. Reviews of the Site Decommissioning Management Plan (SDMP) program found that, while the NRC staff was overseeing the decommissioning program at nuclear facilities in a manner that was protective of public health and safety, progress in decommissioning many sites was slow. As a result NRC determined that formal written procedures should be developed to facilitate the timely decommissioning of licensed nuclear facilities. This handbook was developed to aid NRC staff in achieving this goal. It is intended to be used as a reference document to, and in conjunction with, NRC Inspection Manual Chapter (IMC) 2605, ``Decommissioning Inspection Program for Fuel Cycle and Materials Licensees.`` The policies and procedures discussed in this handbook should be used by NRC staff overseeing the decommissioning program at licensed fuel cycle and materials sites; formerly licensed sites for which the licenses were terminated; sites involving source, special nuclear, or byproduct material subject to NRC regulation for which a license was never issued; and sites in the NRC`s SDMP program. NRC staff overseeing the decommissioning program at nuclear reactor facilities subject to regulation under 10 CFR Part 50 are not required to use the procedures discussed in this handbook.

  3. Uranium contamination due to nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Martin Sanchez, A.; Vera Tome, F.; Diaz Bejarano, J.; Garcia Aparicio, A. (Univ. de Extremadura, Badajoz (Spain). Dept. de Fisica)

    1992-01-01

    Measurements of uranium isotopes and their daughters in the natural series were performed in the cooling reservoirs and their neighborhood of two nuclear power plants, [alpha] and [gamma] spectrometry of samples were used to measure the natural and artificial radionuclides. The nuclear power plants are in the southwest of Spain and one of them has been in operation since 1982, the other plant is in the construction phase. We compare the results obtained for the two sites. (orig.).

  4. DETAILS OF OPERATIONS PERFORMED BY THE REMOTE CONTROL ROBOT (CONCEPT TO THE HORIZONTAL FUEL CHANNEL DURING DECOMMISSIONING PHASE OF NUCLEAR REACTOR CALANDRIA STRUCTURE. PART II: INSIDE OPERATIONS

    Directory of Open Access Journals (Sweden)

    Constantin POPESCU

    2017-05-01

    Full Text Available The authors contribution to this paper is to present a concept solution of a remote control robot (RCR used for decommissioning of the horizontal fuel channels pressure tube in the CANDU nuclear reactor. In this paper the authors highlight few details of geometry, operations, constraints by kinematics and dynamics of the robot movement inside of the reactor fuel channel. Inside operations performed has as the main steps of dismantling process the followings: unblock and extract the channel closure plug (from End Fitting - EF, unblock and extract the channel shield plug (from Lattice Tube - LT, cut the ends of the pressure tube, extract the pressure tube and cut it in small parts, sorting and storage extracted items in the safe robot container. All steps are performed in automatic mode. The remote control robot (RCR represents a safety system controlled by sensors and has the capability to analyze any error registered and decide next activities or abort the inside decommissioning procedure in case of any risk rise in order to ensure the environmental and workers protection.

  5. How do young people evaluate nuclear energy at nuclear power plant sites? An empirical study; Wie bewerten junge Menschen an Standorten von Kernkraftwerken die Kernenergie? Eine empirische Studie

    Energy Technology Data Exchange (ETDEWEB)

    Kretz, Simon [Karlsruher Institut fuer Technologie (KIT), Karlsruhe (Germany). Inst. fuer Geographie und Geooekologie; Kramer, Caroline [Karlsruher Institut fuer Technologie (KIT), Karlsruhe (Germany). Professur fuer Humangeographie

    2014-12-15

    How does the younger generation evaluate nuclear power at sites with nuclear power plants? This has been examined at four sites with different decommissioning stages, as the presence of a nuclear power plant in young people's daily life represents a potential employer as well as a potential risk factor. The attitude of this generation will expectedly and sustainably influence the development of communities. The decommissioning of a nuclear power plant is currently, optimistically estimated by different energy supplying companies with a time period of 15 to 20 year. Thus the resident population will deal with this topic until the year 2040. Furthermore the decision on a repository exploration has been sighted for the year 2013. As a final repository will not be ready for operation at that time, communities will have to deal with the storage of radioactive waste in local interim-storage facilities. The next generation has the opportunity to shape their future as well as the future of their community. Nevertheless the preconditions are to stay at the side as well as the political and social engagement of these young people. n order to study this aspect and the opportunities of action of young people, data was gathered by carrying out a standardised survey, interviewing 762 pupils in February 2014.

  6. 76 FR 1469 - Calvert Cliffs Nuclear Power Plant, LLC; Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2...

    Science.gov (United States)

    2011-01-10

    ... COMMISSION Calvert Cliffs Nuclear Power Plant, LLC; Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2... Cliffs Nuclear Power Plant, LLC, the licensee, for operation of the Calvert Cliffs Nuclear Power Plant..., Calvert Cliffs Nuclear Power Plant (NUREG-1437, Supplement 1), dated......

  7. Nuclear power plant cable materials :

    Energy Technology Data Exchange (ETDEWEB)

    Celina, Mathias C.; Gillen, Kenneth T; Lindgren, Eric Richard

    2013-05-01

    A selective literature review was conducted to assess whether currently available accelerated aging and original qualification data could be used to establish operational margins for the continued use of cable insulation and jacketing materials in nuclear power plant environments. The materials are subject to chemical and physical degradation under extended radiationthermal- oxidative conditions. Of particular interest were the circumstances under which existing aging data could be used to predict whether aged materials should pass loss of coolant accident (LOCA) performance requirements. Original LOCA qualification testing usually involved accelerated aging simulations of the 40-year expected ambient aging conditions followed by a LOCA simulation. The accelerated aging simulations were conducted under rapid accelerated aging conditions that did not account for many of the known limitations in accelerated polymer aging and therefore did not correctly simulate actual aging conditions. These highly accelerated aging conditions resulted in insulation materials with mostly inert aging processes as well as jacket materials where oxidative damage dropped quickly away from the air-exposed outside jacket surface. Therefore, for most LOCA performance predictions, testing appears to have relied upon heterogeneous aging behavior with oxidation often limited to the exterior of the cable cross-section a situation which is not comparable with the nearly homogenous oxidative aging that will occur over decades under low dose rate and low temperature plant conditions. The historical aging conditions are therefore insufficient to determine with reasonable confidence the remaining operational margins for these materials. This does not necessarily imply that the existing 40-year-old materials would fail if LOCA conditions occurred, but rather that unambiguous statements about the current aging state and anticipated LOCA performance cannot be provided based on

  8. Revised analyses of decommissioning for the reference pressurized Water Reactor Power Station. Volume 2, Effects of current regulatory and other considerations on the financial assurance requirements of the decommissioning rule and on estimates of occupational radiation exposure: Appendices, Final report

    Energy Technology Data Exchange (ETDEWEB)

    Konzek, G.J.; Smith, R.I.; Bierschbach, M.C.; McDuffie, P.N.

    1995-11-01

    With the issuance of the final Decommissioning Rule (July 27, 1998), owners and operators of licensed nuclear power plants are required to prepare, and submit to the US Nuclear Regulatory Commission (NRC) for review, decommissioning plans and cost estimates. The NRC staff is in need of bases documentation that will assist them in assessing the adequacy of the licensee submittals, from the viewpoint of both the planned actions, including occupational radiation exposure, and the probable costs. The purpose of this reevaluation study is to provide some of the needed bases documentation. This report contains the results of a review and reevaluation of the 1978 PNL decommissioning study of the Trojan nuclear power plant (NUREG/CR-0130), including all identifiable factors and cost assumptions which contribute significantly to the total cost of decommissioning the nuclear power plant for the DECON, SAFSTOR, and ENTOMB decommissioning alternatives. These alternatives now include an initial 5--7 year period during which time the spent fuel is stored in the spent fuel pool, prior to beginning major disassembly or extended safe storage of the plant. Included for information (but not presently part of the license termination cost) is an estimate of the cost to demolish the decontaminated and clean structures on the site and to restore the site to a ``green field`` condition. This report also includes consideration of the NRC requirement that decontamination and decommissioning activities leading to termination of the nuclear license be completed within 60 years of final reactor shutdown, consideration of packaging and disposal requirements for materials whose radionuclide concentrations exceed the limits for Class C low-level waste (i.e., Greater-Than-Class C), and reflects 1993 costs for labor, materials, transport, and disposal activities.

  9. Revised analyses of decommissioning for the reference pressurized Water Reactor Power Station. Effects of current regulatory and other considerations on the financial assurance requirements of the decommissioning rule and on estimates of occupational radiation exposure, Volume 1, Final report

    Energy Technology Data Exchange (ETDEWEB)

    Konzek, G.J.; Smith, R.I.; Bierschbach, M.C.; McDuffie, P.N. [Pacific Northwest Lab., Richland, WA (United States)

    1995-11-01

    With the issuance of the final Decommissioning Rule (July 27, 1988), owners and operators of licensed nuclear power plants are required to prepare, and submit to the US Nuclear Regulatory Commission (NRC) for review, decommissioning plans and cost estimates. The NRC staff is in need of bases documentation that will assist them in assessing the adequacy of the licensee submittals, from the viewpoint of both the planned actions, including occupational radiation exposure, and the probable costs. The purpose of this reevaluation study is to provide some of the needed bases documentation. This report contains the results of a review and reevaluation of the {prime}978 PNL decommissioning study of the Trojan nuclear power plant (NUREG/CR-0130), including all identifiable factors and cost assumptions which contribute significantly to the total cost of decommissioning the nuclear power plant for the DECON, SAFSTOR, and ENTOMB decommissioning alternatives. These alternatives now include an initial 5--7 year period during which time the spent fuel is stored in the spent fuel pool, prior to beginning major disassembly or extended safe storage of the plant. Included for information (but not presently part of the license termination cost) is an estimate of the cost to demolish the decontaminated and clean structures on the site and to restore the site to a ``green field`` condition. This report also includes consideration of the NRC requirement that decontamination and decommissioning activities leading to termination of the nuclear license be completed within 60 years of final reactor shutdown, consideration of packaging and disposal requirements for materials whose radionuclide concentrations exceed the limits for Class C low-level waste (i.e., Greater-Than-Class C), and reflects 1993 costs for labor, materials, transport, and disposal activities.

  10. 77 FR 47121 - Calvert Cliffs Nuclear Power Plant, LLC; Calvert Cliffs Nuclear Power Plant, Units 1 and 2...

    Science.gov (United States)

    2012-08-07

    ... COMMISSION Calvert Cliffs Nuclear Power Plant, LLC; Calvert Cliffs Nuclear Power Plant, Units 1 and 2; Exemption 1.0 Background Calvert Cliffs Nuclear Power Plant, LLC (the licensee) is the holder of Renewed..., ``Fatigue Management for Nuclear Power Plant Personnel,'' endorses the Nuclear Energy......

  11. Determination of the activation level in the decommissioning inventory of the NPP Krsko

    Energy Technology Data Exchange (ETDEWEB)

    Jaag, S.; Graebner, G.; Keck, B. [NIS Ingenieurgesellschaft mbH, Alzenau (Germany); Glaser, B. [Nuklearna Elektrarna Krsko (Slovenia)

    2010-05-15

    In support of a plant specific preliminary decommissioning plan the MCNP 5 code system /1/ was used to model the Krsko-reactor core and its external components relevant for activation analysis and decommissioning in 3D-geometry. By MCNP neutron transport calculations transfer functions for the space-dependent total neutron flux and the space-dependent rates (1-group cross sections) of the most relevant nuclear reactions were generated. These transfer functions were combined with the reactor operational data, and ORIGEN-2.1 /2/ irradiation calculations were performed to provide the activation levels of the individual reactor components. The results are presented and the uncertainties are discussed. (orig.)

  12. Psychological empowerment in French nuclear power plants

    OpenAIRE

    Fillol, Charlotte

    2011-01-01

    Since the eighties, nuclear safety has been discussed in organizational studies and constitutes nowadays a specific stream with several standpoints. Regarding the reliability of nuclear plants, the nuclear safety literature has emphasized on the crucial role of individuals and human factors. Especially, some researchers have noticed rule breaking behavior and the impact of individual self-confidence on thebehavior; but without deepening their analyses. As high self-esteem and confidence, i.e....

  13. Questions and Answers About Nuclear Power Plants.

    Science.gov (United States)

    Environmental Protection Agency, Washington, DC.

    This pamphlet is designed to answer many of the questions that have arisen about nuclear power plants and the environment. It is organized into a question and answer format, with the questions taken from those most often asked by the public. Topics include regulation of nuclear power sources, potential dangers to people's health, whether nuclear…

  14. Decommissioning a phosphoric acid production plant: a radiological protection case study.

    Science.gov (United States)

    Stamatis, V; Seferlis, S; Kamenopoulou, V; Potiriadis, C; Koukouliou, V; Kehagia, K; Dagli, C; Georgiadis, S; Camarinopoulos, L

    2010-12-01

    During a preliminary survey at the area of an abandoned fertilizer plant, increased levels of radioactivity were measured at places, buildings, constructions and materials. The extent of the contamination was determined and the affected areas were characterized as controlled areas. After the quantitative and qualitative determination of the contaminated materials, the decontamination was planned and performed step by step: the contaminated materials were categorized according to their physical characteristics (scrap metals, plastic pipes, scales and residues, building materials, etc) and according to their level of radioactivity. Depending on the material type, different decontamination and disposal options were proposed; the most appropriate technique was chosen taking into account apart from technical issues, the legal framework, radiation protection issues, the opinion of the local authorities involved as well as the owner's wish. After taking away the biggest amount of the contaminated materials, an iterative process consisting of surveys and decontamination actions was performed in order to remove the residual traces of contamination from the area. During the final survey, no residual surface contamination was detected; some sparsely distributed low level contaminated materials deeply immersed into the soil were found and removed.

  15. Nuclear power plant security assessment technical manual.

    Energy Technology Data Exchange (ETDEWEB)

    O' Connor, Sharon L.; Whitehead, Donnie Wayne; Potter, Claude S., III

    2007-09-01

    This report (Nuclear Power Plant Security Assessment Technical Manual) is a revision to NUREG/CR-1345 (Nuclear Power Plant Design Concepts for Sabotage Protection) that was published in January 1981. It provides conceptual and specific technical guidance for U.S. Nuclear Regulatory Commission nuclear power plant design certification and combined operating license applicants as they: (1) develop the layout of a facility (i.e., how buildings are arranged on the site property and how they are arranged internally) to enhance protection against sabotage and facilitate the use of physical security features; (2) design the physical protection system to be used at the facility; and (3) analyze the effectiveness of the PPS against the design basis threat. It should be used as a technical manual in conjunction with the 'Nuclear Power Plant Security Assessment Format and Content Guide'. The opportunity to optimize physical protection in the design of a nuclear power plant is obtained when an applicant utilizes both documents when performing a security assessment. This document provides a set of best practices that incorporates knowledge gained from more than 30 years of physical protection system design and evaluation activities at Sandia National Laboratories and insights derived from U.S. Nuclear Regulatory Commission technical staff into a manual that describes a development and analysis process of physical protection systems suitable for future nuclear power plants. In addition, selected security system technologies that may be used in a physical protection system are discussed. The scope of this document is limited to the identification of a set of best practices associated with the design and evaluation of physical security at future nuclear power plants in general. As such, it does not provide specific recommendations for the design and evaluation of physical security for any specific reactor design. These best practices should be applicable to the design and

  16. 78 FR 38739 - Special Nuclear Material Control and Accounting Systems for Nuclear Power Plants

    Science.gov (United States)

    2013-06-27

    ... COMMISSION Special Nuclear Material Control and Accounting Systems for Nuclear Power Plants AGENCY: Nuclear... Accounting Systems for Nuclear Power Plants.'' This regulatory guide provides guidance on recordkeeping and... nuclear material control and accounting system requirements for nuclear power plants. This guide applies...

  17. 77 FR 28407 - Special Nuclear Material Control and Accounting Systems for Nuclear Power Plants

    Science.gov (United States)

    2012-05-14

    ... COMMISSION Special Nuclear Material Control and Accounting Systems for Nuclear Power Plants AGENCY: Nuclear...-5028, ``Special Nuclear Material Control and Accounting Systems for Nuclear Power Plants.'' In DG-5028... Control and Accounting Systems for Nuclear Power Plants.'' DATES: Submit comments by July 16, 2012...

  18. 78 FR 50458 - Entergy Nuclear Operations, Inc., James A. Fitzpatrick Nuclear Power Plant, Vermont Yankee...

    Science.gov (United States)

    2013-08-19

    ... COMMISSION Entergy Nuclear Operations, Inc., James A. Fitzpatrick Nuclear Power Plant, Vermont Yankee Nuclear... petitioners'') has requested that the NRC take action with regard to James A. Fitzpatrick Nuclear Power Plant... with regard to James A. Fitzpatrick Nuclear Power Plant (Fitzpatrick), Vermont Yankee Nuclear...

  19. An outsider`s view of decommissioning

    Energy Technology Data Exchange (ETDEWEB)

    Wilkie, T. [The Independent and The Independent on Sunday Newspapers, London (United Kingdom)

    1996-10-01

    The decommissioning of nuclear facilities is not just a technical or even a financial issue. Presenting decommissioning as a technically difficult task overcome by superhuman effort on the part of the industry will not gain much credit amongst sophisticated consumers who now require that any complex technology will work and work safely. Any engineering problems are surmountable given the money to find the solution. Some of the financial aspects of decommissioning are worrying, however, given their open-ended nature. The cost of waste disposal is one of these. Despite a lapse of fifty years since the start-up of its first reactor, the United Kingdom is unlikely to have available a repository for the disposal of intermediate level waste until about 2020. Waste disposal is a large consideration in decommissioning and the industry`s forecasts of cost in this area lack credibility in the light of a poor track record in financial prediction. Financial engineering in the form of the segregated fund set up in March 1996 to cover the decommissioning of nuclear power stations in the United Kingdom is likely to provide only short term reassurance in the light of doubts about a credible future for nuclear power. This lack of confidence over the wider problems of nuclear power creates particular problems for decommissioning which go beyond technical difficulties and complicate financial considerations. (UK).

  20. Drought prompts government to close nuclear plant

    CERN Multimedia

    2003-01-01

    "A nuclear power plant was shut down Sunday because a record drought left insufficient water to cool down the reactor. The plant supplies more than 10 percent of Romania's electricity and closure prompted fears of a price hike" (1/2 page).

  1. Validation of Decommissioning Engineering System Application against KRR-2

    Energy Technology Data Exchange (ETDEWEB)

    Jin, Hyung Gon; Park, Seungkook; Park, Heeseong; Song, Chanho; Ha, Jaehyun [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2015-05-15

    KAERI is the only expert group which has decommissioning experiences and KAERI is trying to develop computer code to converge all the data which has been accumulated during KRR (Korea Research Reactor)-1 and 2 and UCP (Uranium Conversion Plant) decommission. This paper contains validation results of the KAERI DES by using KRR-2 decommissioning data. As a responsible leading group of Korean decommissioning research field, KAERI has been developing DES application program. One of decommissioning experience data, KRR-2 was used for KAERI DES validation and it successfully is reflected in KAERI DES.

  2. Safety Assessment - Swedish Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Kjellstroem, B. [Luleaa Univ. of Technology (Sweden)

    1996-12-31

    After the reactor accident at Three Mile Island, the Swedish nuclear power plants were equipped with filtered venting of the containment. Several types of accidents can be identified where the filtered venting has no effect on the radioactive release. The probability for such accidents is hopefully very small. It is not possible however to estimate the probability accurately. Experiences gained in the last years, which have been documented in official reports from the Nuclear Power Inspectorate indicate that the probability for core melt accidents in Swedish reactors can be significantly larger than estimated earlier. A probability up to one in a thousand operating years can not be excluded. There are so far no indications that aging of the plants has contributed to an increased accident risk. Maintaining the safety level with aging nuclear power plants can however be expected to be increasingly difficult. It is concluded that the 12 Swedish plants remain a major threat for severe radioactive pollution of the Swedish environment despite measures taken since 1980 to improve their safety. Closing of the nuclear power plants is the only possibility to eliminate this threat. It is recommended that until this is done, quantitative safety goals, same for all Swedish plants, shall be defined and strictly enforced. It is also recommended that utilities distributing misleading information about nuclear power risks shall have their operating license withdrawn. 37 refs.

  3. Cell fusion and nuclear fusion in plants.

    Science.gov (United States)

    Maruyama, Daisuke; Ohtsu, Mina; Higashiyama, Tetsuya

    2016-12-01

    Eukaryotic cells are surrounded by a plasma membrane and have a large nucleus containing the genomic DNA, which is enclosed by a nuclear envelope consisting of the outer and inner nuclear membranes. Although these membranes maintain the identity of cells, they sometimes fuse to each other, such as to produce a zygote during sexual reproduction or to give rise to other characteristically polyploid tissues. Recent studies have demonstrated that the mechanisms of plasma membrane or nuclear membrane fusion in plants are shared to some extent with those of yeasts and animals, despite the unique features of plant cells including thick cell walls and intercellular connections. Here, we summarize the key factors in the fusion of these membranes during plant reproduction, and also focus on "non-gametic cell fusion," which was thought to be rare in plant tissue, in which each cell is separated by a cell wall.

  4. Decommissioning process of the experimental nuclear reactor ARGOS, sited at the Technical School of Industrial Engineering in Barcelona; Proceso de desmantelamiento del reactor nuclear experimental Argos de la Universidad Politecnica de Catalunya

    Energy Technology Data Exchange (ETDEWEB)

    Ortega Aramburu, X.; Duch Guillen, M. A.

    2005-07-01

    The experimental nuclear reactor ARGOS, sited at the Technical School of Industrial Engineering in Barcelona, was an experimental reactor used for training purposes, from 1963 to 1977. Due to economic and administrative circumstances this facility was closed down at the end of this period and the fuel remained the fuel inside the reactor core. In 1994 the fuel was removed. The administrative licence was finally agreed with the authorities in 1998 after a long delay. The decommissioning operations began in 2001. The University dismantled, temporarily stored, checked and classified about 1200 components with a total weight of 154.4 t. The material which was declassified from the radiation protection point of view was approximately 99.9% of all the material. After presenting the final documents to the appropriate authorities the formal closing declaration was agreed in December 2003. After this date the site could be used for any purpose and it was the first case of the decommissioning of a nuclear reactor in Spain. Recently the ARGOS building have been finally demolished. (Author)

  5. 75 FR 66802 - Calvert Cliffs Nuclear Power Plant, LLC; Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2...

    Science.gov (United States)

    2010-10-29

    ... COMMISSION Calvert Cliffs Nuclear Power Plant, LLC; Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2... Regulatory Commission (the Commission) has granted the request of Calvert Cliffs Nuclear Power Plant, LLC... Operating License Nos. DPR-53 and DPR-69 for the Calvert Cliffs Nuclear Power Plant, Unit......

  6. 76 FR 39908 - Calvert Cliffs Nuclear Power Plant, LLC; Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2...

    Science.gov (United States)

    2011-07-07

    ... COMMISSION Calvert Cliffs Nuclear Power Plant, LLC; Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2.... DPR-53 and DPR-69, for the Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2 (CCNPP), respectively... (ISFSI), currently held by Calvert Cliffs Nuclear Power Plant, LLC as owner and licensed......

  7. The Advanced BWR Nuclear Plant: Safe, economic nuclear energy

    Energy Technology Data Exchange (ETDEWEB)

    Redding, J.R. [GE Nuclear Energy, San Jose, CA (United States)

    1994-12-31

    The safety and economics of Advanced BWR Nuclear Power Plants are outlined. The topics discussed include: ABWR Programs: status in US and Japan; ABWR competitiveness: safety and economics; SBWR status; combining ABWR and SBWR: the passive ABWR; and Korean/GE partnership.

  8. A NOVEL APPROACH TO SPENT FUEL POOL DECOMMISSIONING

    Energy Technology Data Exchange (ETDEWEB)

    R. L. Demmer

    2011-04-01

    The Idaho National Laboratory (INL) has been at the forefront of developing methods to reduce the cost and schedule of deactivating spent fuel pools (SFP). Several pools have been deactivated at the INL using an underwater approach with divers. These projects provided a basis for the INL cooperation with the Dresden Nuclear Power Station Unit 1 SFP (Exelon Generation Company) deactivation. It represents the first time that a commercial nuclear power plant (NPP) SFP was decommissioned using this underwater coating process. This approach has advantages in many aspects, particularly in reducing airborne contamination and allowing safer, more cost effective deactivation. The INL pioneered underwater coating process was used to decommission three SFPs with a total combined pool volume of over 900,000 gallons. INL provided engineering support and shared project plans to successfully initiate the Dresden project. This report outlines the steps taken by INL and Exelon to decommission SFPs using the underwater coating process. The rationale used to select the underwater coating process and the advantages and disadvantages are described. Special circumstances are also discussed, such as the use of a remotely-operated underwater vehicle to visually and radiologically map the pool areas that were not readily accessible. A larger project, the INTEC-603 SFP in-situ (grouting) deactivation, is reviewed. Several specific areas where special equipment was employed are discussed and a Lessons Learned evaluation is included.

  9. 75 FR 14638 - FirstEnergy Nuclear Operating Company; Perry Nuclear Power Plant; Environmental Assessment and...

    Science.gov (United States)

    2010-03-26

    ... COMMISSION FirstEnergy Nuclear Operating Company; Perry Nuclear Power Plant; Environmental Assessment and...Energy Nuclear Operating Company (FENOC, the licensee), for operation of the Perry Nuclear Power Plant... Manager, Plant Licensing Branch III-2, Division of Operating Reactor Licensing, Office of Nuclear...

  10. Construct ability Improvement for Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Dae Soo; Lee, Jong Rim; Kim, Jong Ku [Korea Electric Power Research Institute, Taejon (Korea, Republic of)

    1997-12-31

    The purpose of this study was to identify methods for improving the construct ability of nuclear power plants. This study reviewed several references of current construction practices of domestic and overseas nuclear plants in order to identify potential methods for improving construct ability. The identified methods for improving construct ability were then evaluated based on the applicability to domestic nuclear plant construction. The selected methods are expected to reduce the construction period, improve the quality of construction, cost, safety, and productivity. Selection of which methods should be implemented will require further evaluation of construction modifications, design changes, contract revisions. Among construction methods studied, platform construction methods can be applied through construction sequence modification without significant design changes, and Over the Top construction method of the NSSS, automatic welding of RCL pipes, CLP modularization, etc., are considered to be applied after design modification and adjustment of material lead time. (author). 49 refs., figs., tabs.

  11. Thermodynamics in nuclear power plant systems

    CERN Document Server

    Zohuri, Bahman

    2015-01-01

    This book covers the fundamentals of thermodynamics required to understand electrical power generation systems, honing in on the application of these principles to nuclear reactor powersystems. It includes all the necessary information regarding the fundamental laws to gain a complete understanding and apply them specifically to the challenges of operating nuclear plants. Beginning with definitions of thermodynamic variables such as temperature, pressure and specific volume, the book then explains the laws in detail, focusing on pivotal concepts such as enthalpy and entropy, irreversibilit

  12. Virtual environments for nuclear power plant design

    Energy Technology Data Exchange (ETDEWEB)

    Brown-VanHoozer, S.A.; Singleterry, R.C. Jr.; King, R.W. [and others

    1996-03-01

    In the design and operation of nuclear power plants, the visualization process inherent in virtual environments (VE) allows for abstract design concepts to be made concrete and simulated without using a physical mock-up. This helps reduce the time and effort required to design and understand the system, thus providing the design team with a less complicated arrangement. Also, the outcome of human interactions with the components and system can be minimized through various testing of scenarios in real-time without the threat of injury to the user or damage to the equipment. If implemented, this will lead to a minimal total design and construction effort for nuclear power plants (NPP).

  13. Decommissioning of the nuclear facilities at Risoe National Laboratory. Descriptions and cost assessment. Danish summary[Denmark]; Dekommissionering af Risoes nukleare anlaeg - vurdering af opgaver og omkostninger. Dansk sammenfatning

    Energy Technology Data Exchange (ETDEWEB)

    Lauridsen, Kurt

    2001-02-01

    The report gives a brief description of relevant aspects of the decommissioning of all nuclear facilities at Risoe National Laboratory, including the necessary operations to be performed and the associated costs. Together with a more detailed report, written in English, this report is the result of a project initiated by Risoe in the summer of 2000. The English report has undergone an international review, the results of which are summarised in the present report. (au)

  14. Y-12 Plant decontamination and decommissioning technology logic diagram for Building 9201-4. Volume 3: Technology evaluation data sheets; Part A: Characterization, dismantlement

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-09-01

    The Y-12 Plant Decontamination and Decommissioning Technology Logic Diagram for Building 9201-4 (TLD) was developed to provide a decision-support tool that relates decontamination and decommissioning (D and D) problems at Bldg. 9201-4 to potential technologies that can remediate these problems. The TLD uses information from the Strategic Roadmap for the Oak Ridge Reservation, the Oak Ridge K-25 Site Technology Logic Diagram, the Oak Ridge National Laboratory Technology Logic Diagram, and a previous Hanford logic diagram. This TLD identifies the research, development, demonstration, testing, and evaluation needed for sufficient development of these technologies to allow for technology transfer and application to D and D and waste management (WM) activities. It is essential that follow-on engineering studies be conducted to build on the output of this project. These studies will begin by selecting the most promising technologies identified in the TLD and by finding an optimum mix of technologies that will provide a socially acceptable balance between cost and risk. This report consists of the characterization and dismantlement data sheets.

  15. Evaluation of the UCP Decommissioning Activities in 2008 using DECOMMIS

    Energy Technology Data Exchange (ETDEWEB)

    Park, S. K.; Park, J. H; Hwang, D. S.; Lee, K. W.; Chung, U. S. [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2009-05-15

    In early 1992, Korea Atomic Energy Research Institute (KAERI) decided that the operation of the Uranium Conversion Plant (UCP) would be stopped due to a relatively higher production cost than that of the international market. The conversion plant has been shut down and minimally maintained for the prevention of a contamination by a deterioration of the equipment and the lagoon. In 2000, the decommissioning was finally decided upon and a decommissioning program was launched to complete the following tasks by 2010 with the total budget, 10 million US dollars: planning and assessment of the environmental impact; dismantling of the pipes, tanks, vessels and equipment for a canning or reuse; decontamination of the dismantled metal wastes for release, decontamination of the building for an reuse as an another experimental facility, and the treatment of the sludge waste and the demolition of the lagoon. The decommissioning works started in 2004. The Uranium Conversion Plant building is composed 3 stories and the floor area is 2,950 m{sup 2}. The equipment and facilities consist of chemical reactors such as a dissolver and FBR, tanks, pumps, pipes, and electric and electronic equipment. The radiological conditions before a dismantling were as follows; radiation dose 3x10{sup -4}{approx}3x10{sup -2} mSv/hr, surface contamination of equipment and structure 0.001{approx}3.6 Bq/cm{sup 2}, and surface contamination of concrete 0.01{approx}1.4 Bq/cm{sup 2}. The lagoon is used for store the waste water which generated during an operation. The lagoon consists of two artificial ponds constructed by a concrete structure with a lubber coating and the surface area is 760 m{sup 2}. Total weight of the sludge is about 330 tons. The major compounds are ammonium nitrate, sodium nitrate, calcium nitrate, calcium carbonate, and natural uranium of 1 wt%. Radiological conditions were as follows; radiation dose 1x10{sup -4}{approx}3x10{sup -3} mSv/hr. The DECOMMIS, which is the data base

  16. Initial decommissioning planning for the Budapest research reactor

    OpenAIRE

    Toth Gabor

    2011-01-01

    The Budapest Research Reactor is the first nuclear research facility in Hungary. The reactor is to remain in operation for at least another 13 years. At the same time, the development of a decommissioning plan is a mandatory requirement under national legislation. The present paper describes the current status of decommissioning planning which is aimed at a timely preparation for the forthcoming decommissioning of the reactor.

  17. Initial decommissioning planning for the Budapest research reactor

    Directory of Open Access Journals (Sweden)

    Toth Gabor

    2011-01-01

    Full Text Available The Budapest Research Reactor is the first nuclear research facility in Hungary. The reactor is to remain in operation for at least another 13 years. At the same time, the development of a decommissioning plan is a mandatory requirement under national legislation. The present paper describes the current status of decommissioning planning which is aimed at a timely preparation for the forthcoming decommissioning of the reactor.

  18. 76 FR 66089 - Access Authorization Program for Nuclear Power Plants

    Science.gov (United States)

    2011-10-25

    ... COMMISSION Access Authorization Program for Nuclear Power Plants AGENCY: Nuclear Regulatory Commission... revision to Regulatory Guide 5.66, ``Access Authorization Program for Nuclear Power Plants.'' This guide... Authorization Requirements for Nuclear Power Plants,'' and 10 CFR part 26, ``Fitness for Duty Programs.'' The......

  19. Assessment of nuclear power plant siting methods

    Energy Technology Data Exchange (ETDEWEB)

    Rowe, M.D.; Hobbs, B.F.; Pierce, B.L.; Meier, P.M.

    1979-11-01

    Several different methods have been developed for selecting sites for nuclear power plants. This report summarizes the basic assumptions and formal requirements of each method and evaluates conditions under which each is correctly applied to power plant siting problems. It also describes conditions under which different siting methods can produce different results. Included are criteria for evaluating the skill with which site-selection methods have been applied.

  20. Hot Chemistry Laboratory decommissioning activities at IPEN/CNEN-SP, Brazil

    Energy Technology Data Exchange (ETDEWEB)

    Camilo, Ruth L.; Lainetti, Paulo E.O. [Instituto de Pesquisas Energeticas e Nucleares (IPEN/CNEN-SP), Sao Paulo, SP (Brazil)], e-mail: rcamilo@ipen.br, e-mail: lainetti@ipen.br

    2009-07-01

    IPEN's fuel cycle activities were accomplished in laboratory and pilot plant scale and most facilities were built in the 70-80 years. Nevertheless, radical changes of the Brazilian nuclear policy in the beginning of 90's determined the interruption of several fuel cycle activities and facilities shutdown. Since then, IPEN has faced the problem of the pilot plants decommissioning considering that there was no experience/expertise in this field at all. In spite of this, some laboratory and pilot plant decommissioning activities have been performed in IPEN in the last years, even without previous experience and training support. One of the first decommissioning activities accomplished in IPEN involved the Hot Chemistry Laboratory. This facility was built in the beginning of the 80's with the proposal of supporting research and development in the nuclear chemistry area. It was decided to settle a new laboratory in the place where the Hot Chemistry Laboratory was installed, being necessary its total releasing from the radioactive contamination point of view. The previous work in the laboratory involved the manipulation of samples of irradiated nuclear fuel, besides plutonium-239 and uranium-233 standard solutions. There were 5 glove-boxes in the facility but only 3 were used with radioactive material. The glove-boxes contained several devices and materials, besides the radioactive compounds, such as: electric and electronic equipment, metallic and plastic pieces, chemical reagents, liquid and solid radioactive wastes, etc. The laboratory's decommissioning process was divided in 12 steps. This paper describes the procedures, problems faced and results related to the Hot Chemistry Laboratory decommissioning operations and its reintegration as a new laboratory of the Chemical and Environmental Technology Center (CQMA) - IPEN-CNEN/SP. (author)

  1. Decommissioning of DR 1, Final report

    Energy Technology Data Exchange (ETDEWEB)

    Lauridsen, Kurt

    2006-01-15

    The report describes the decommissioning activities carried out at the 2kW homogeneous reactor DR 1 at Risoe National Laboratory. The decommissioning work took place from summer 2004 until late autumn 2005. The components with the highest activity, the core vessel the recombiner and the piping and valves connected to these, were dismantled first by Danish Decommissioning's own technicians. Demolition of the control rod house and the biological shield as well as the removal of the floor in the reactor hall was carried out by an external demolition contractor. The building was emptied and left for other use. Clearance measurements of the building showed that radionuclide concentrations were everywhere below the clearance limit set by the Danish nuclear regulatory authorities. Furthermore, measurements on the surrounding area showed that there was no contamination that could be attributed to the operation and decommissioning of DR 1. (au)

  2. Nuclear Trafficking During Plant Innate Immunity

    Institute of Scientific and Technical Information of China (English)

    Jun Liu; Gitta Coaker

    2008-01-01

    Land plants possess innate immune systems that can control resistance against pathogen infection. Conceptually, there are two branches of the plant innate immune system. One branch recognizes conserved features of microbial pathogens, while a second branch specifically detects the presence of pathogen effector proteins by plant resistance (R) genes. Innate immunity controlled by plant R genes is called effector-triggered immunity. Although R genes can recognize all classes of plant pathogens, the majority can be grouped into one large family, encoding proteins with a nucleotide binding site and C-terminal leucine rich repeat domains. Despite the importance and number of R genes present in plants, we are just beginning to decipher the signaling events required to initiate defense responses. Recent exciting discoveries have implicated dynamic nuclear trafficking of plant R proteins to achieve effector-triggered immunity. Furthermore, there are several additional lines of evidence implicating nucleo-cyctoplasmic trafficking in plant disease resistance, as mutations in nucleoporins and importins can compromise resistance signaling. Taken together, these data illustrate the importance of nuclear trafficking in the manifestation of disease resistance mediated by R genes.

  3. 76 FR 4391 - Calvert Cliffs Nuclear Power Plant, LLC, Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2...

    Science.gov (United States)

    2011-01-25

    ... COMMISSION Calvert Cliffs Nuclear Power Plant, LLC, Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2; Exemption 1.0 Background Calvert Cliffs Nuclear Power Plant, LLC, the licensee, is the holder of Facility Operating License Nos. DPR-53 and DPR-69 which authorizes operation of the Calvert Cliffs Nuclear...

  4. Recent Advances in Ocean Nuclear Power Plants

    Directory of Open Access Journals (Sweden)

    Kang-Heon Lee

    2015-10-01

    Full Text Available In this paper, recent advances in Ocean Nuclear Power Plants (ONPPs are reviewed, including their general arrangement, design parameters, and safety features. The development of ONPP concepts have continued due to initiatives taking place in France, Russia, South Korea, and the United States. Russia’s first floating nuclear power stations utilizing the PWR technology (KLT-40S and the spar-type offshore floating nuclear power plant designed by a research group in United States are considered herein. The APR1400 and SMART mounted Gravity Based Structure (GBS-type ONPPs proposed by a research group in South Korea are also considered. In addition, a submerged-type ONPP designed by DCNS of France is taken into account. Last, issues and challenges related to ONPPs are discussed and summarized.

  5. Estimating boiling water reactor decommissioning costs. A user`s manual for the BWR Cost Estimating Computer Program (CECP) software: Draft report for comment

    Energy Technology Data Exchange (ETDEWEB)

    Bierschbach, M.C. [Pacific Northwest Lab., Richland, WA (United States)

    1994-12-01

    With the issuance of the Decommissioning Rule (July 27, 1988), nuclear power plant licensees are required to submit to the U.S. Regulatory Commission (NRC) for review, decommissioning plans and cost estimates. This user`s manual and the accompanying Cost Estimating Computer Program (CECP) software provide a cost-calculating methodology to the NRC staff that will assist them in assessing the adequacy of the licensee submittals. The CECP, designed to be used on a personal computer, provides estimates for the cost of decommissioning BWR power stations to the point of license termination. Such cost estimates include component, piping, and equipment removal costs; packaging costs; decontamination costs; transportation costs; burial costs; and manpower costs. In addition to costs, the CECP also calculates burial volumes, person-hours, crew-hours, and exposure person-hours associated with decommissioning.

  6. 75 FR 16524 - FirstEnergy Nuclear Operating Company, Perry Nuclear Power Plant; Exemption

    Science.gov (United States)

    2010-04-01

    ... COMMISSION FirstEnergy Nuclear Operating Company, Perry Nuclear Power Plant; Exemption 1.0 Background First.... NFP-58, which authorizes operation of the Perry Nuclear Power Plant, Unit 1 (PNPP). The license... rule's compliance date for all operating nuclear power plants, but noted that the...

  7. Modelling the Economics of a New Nuclear Power Plant in Switzerland

    Energy Technology Data Exchange (ETDEWEB)

    Winkler, Thomas [University of Applied Sciences Ansbach, Residenzstrasse 8, 91522 Ansbach (Germany); Aare-Tessin Ltd for Electricity, Bahnhofquai 12, 4601 Olten (Switzerland); Streit, Marco [Aare-Tessin Ltd for Electricity, Bahnhofquai 12, 4601 Olten (Switzerland)

    2008-07-01

    Financing a new nuclear power plant is challenging right from the beginning and the problem of very high capital costs during the construction phase is not the only one. Long planning periods with high risk capital as well as many political influences during a long decision and planning process are the factors that are complicating the economic modelling. Nevertheless, the Net Present Value (NPV) and the Internal Rate of Return (IRR) which are calculated by discounting forecasted future cash flows are important numbers for decision makers. But these numbers strongly depend on the scenarios and input data used during the calculations. This study offers an overview of present Swiss electricity situation and the economics of the existing Swiss Nuclear Power Plants. Furthermore, a modelling tool will be introduced which allows comparing different scenarios for the whole life cycle of a nuclear power plant (planning, licensing, construction, commercial operation, decommissioning). In the third part, this study will show on a calculation example both the range of results and the different influences of escalation rates or higher costs by means of a calculation example. (authors)

  8. Structure and Function Design for Nuclear Facilities Decommissioning Information Database%核设施退役信息数据库的结构与功能设计

    Institute of Scientific and Technical Information of China (English)

    刘永阔; 宋怡; 吴小天; 刘震

    2014-01-01

    核设施退役工程是一项不仅需要考虑拆除(毁)设备、建筑物,还要考虑辐射影响和核废物处理的复杂工程,其拆除(毁)工作具有高危险、高污染的特点,因此建立针对核设施退役项目的信息系统辅助退役工程很有意义。本文通过收集退役活动数据(设备物资数据、源项数据、辐射剂量数据等)设计退役信息数据库,开发了基于退役数据库的信息管理系统,该系统可对数据库中各类信息数据(照片、图纸、辐射数据、时间等)进行录入、删除、修改、查询等基本操作,并根据各类数据处理流程的特点分功能模块进行相应数据信息的管理,并对不同数据信息进行分析。该系统可提升退役过程中的管理能力,优化工程安排,减少作业人员所受辐射剂量,是顺利进行退役活动的必要基础。%The decommissioning of nuclear facilities is a radioactive and high-risk project which has to consider the effect of radiation and nuclear waste disposal ,so the informa-tion system of nuclear facilities decommissioning project must be established to ensure the safety of the project .In this study ,by collecting the decommissioning activity data , the decommissioning database was established ,and based on the database ,the decom-missioning information database (DID) was developed .The DID can perform some basic operations ,such as input ,delete ,modification and query of the decommissioning infor-mation data ,and in accordance with processing characteristics of various types of infor-mation data ,it can also perform information management with different function mod-els .On this basis ,analysis of the different information data will be done .The system is helpful for enhancing the management capability of the decommissioning process and optimizing the arrangements of the project , it also can reduce radiation dose of theworkers ,so the system is quite necessary for

  9. Industrial Complex for Solid Radwaste Management at Chernobyle Nuclear Power Plant

    Energy Technology Data Exchange (ETDEWEB)

    Ahner, S.; Fomin, V. V.

    2002-02-26

    In the framework of the preparation for the decommissioning of the Chernobyl Nuclear Power Plant (ChNPP) an Industrial Complex for Solid Radwaste Management (ICSRM) will be built under the EC TACIS Program in the vicinity of ChNPP. The paper will present the proposed concepts and their integration into existing buildings and installations. Further, the paper will consider the safety cases, as well as the integration of Western and Ukrainian Organizations into a cohesive project team and the requirement to guarantee the fulfillment of both Western standards and Ukrainian regulations and licensing requirements. The paper will provide information on the status of the interim design and the effects of value engineering on the output of basic design phase. The paper therefor summarizes the design results of the involved design engineers of the Design and Process Providers BNFL (LOT 1), RWE NUKEM GmbH (LOT 2 and General) and INITEC (LOT 3).

  10. Extending the Life Time of a Nuclear Power Plant: Impact on Nuclear Liabilities in the Czech Republic

    Directory of Open Access Journals (Sweden)

    L. Havlíček

    2007-01-01

    Full Text Available Nuclear power plant (NPP operators have several basic long-term liabilities. Such liabilities include storage, treatment and disposal of radioactive waste generated at the operators’ NPP, storage and management of nuclear fuel irradiated in the reactor of the operator’s NPP (“spent fuel”, disposal of the spent fuel (SF or residues resulting from spent fuel reprocessing. Last but not least, the operator is liable for decommissioning its nuclear facilities. If the operator considers extending the life time of its NPP or if the construction of a new NPP is being evaluated by an investor, an integral part of the economic evaluation must be a comprehensive assessment of future incremental costs related to the above-mentioned long-term liabilities. An economic evaluation performed by standard methods (usually NPV, alternatively real options leads to a decision either to proceed with the project or to shelve it. If the investor decides to go ahead with the project there can be an immediate impact on nuclear liabilities. The impact is not the same for all operator liabilities. Depending on the valid legislation and the nature of the liability, in some cases the extent of the liability must be immediately recalculated when a decision is made to proceed with the project, and the annual accrual of accumulated reserves / funds must be adjusted. In other cases, the change in liability is linked to the generation of additional radioactive waste or spent fuel. In the Czech Republic, responsibility for each of the nuclear liabilities is defined, as is the form in which the financial means are to be accumulated. This paper deals with the impact of NPP life time extension (alternatively NPP power up-rate or construction of a new NPP on individual nuclear liabilities in the conditions of the Czech Republic. 

  11. 77 FR 75198 - Standard Format and Content for Post-Shutdown Decommissioning Activities Report

    Science.gov (United States)

    2012-12-19

    ... COMMISSION Standard Format and Content for Post-Shutdown Decommissioning Activities Report AGENCY: Nuclear... Format and Content for Post-shutdown Decommissioning Activities Report.'' This guide describes a method...) 1.185, ``Standard Format and Content for Post-shutdown Decommissioning Activities Report,''...

  12. About a hypothetical terrorist attack on a nuclear power plant

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-10-01

    After the terrorism attack on the World Trade Center, a record number ( two thirds) of US citizens favour the use of nuclear energy and consider nuclear plants to be safe. At the same time 59% definitely support building more nuclear plants, less than in March during the Californian crisis, but more than earlier., Most american citizens ( 84%) continue to support licence renewal for nuclear plants and 72 % agree with keeping the option open to build new nuclear plants in the future. The strongest supporters are those who have visited a nuclear plant or information centre. (N.C.)

  13. U.S. Nuclear Power Reactor Plant Status

    Data.gov (United States)

    Nuclear Regulatory Commission — Demographic data on U.S. commercial nuclear power reactors, including: plant name/unit number, docket number, location, licensee, reactor/containment type, nuclear...

  14. Comparative analysis of the Oskarshamn 3 and Barsebaeck site decommissioning studies

    Energy Technology Data Exchange (ETDEWEB)

    Hansson, Bertil (Bewon, Loeddekoepinge (Sweden)); Joensson, Lars-Olof (Barsebaeck Kraft AB, Loeddekoepinge (Sweden))

    2009-01-15

    what is included. For future cost estimates and in order to permit comparison of results, the power plant owner must clearly specify in the decommissioning plan boundary conditions, what facilities/buildings are included and the decommissioning schedule. Strategies for how to manage plant staff, as well as how the staff will participate in the decommissioning activities, are the responsibility of the power plant owner. To facilitate comparison, it is desirable to have a set of similar boundary conditions, end states etc. In reality, different decommissioning projects will be based on different premises, and it is essential that all conditions be documented clearly and transparently. Experience shows that the method used today, where the estimated decommissioning cost from a reference plant is transferred in almost direct relation to unit size and thermal power, is not accurate, but instead only a small portion is related to thermal power. For this reason, unit- and site-specific decommissioning cost calculations are recommended, based on well defined and transparent documented premises. A decommissioning project can in many ways be compared to a cross between a maintenance outage and the construction of a nuclear facility. Decommissioning is not so far off in time, and it is therefore surprising that such meagre resources are devoted to the detailed planning of the activities in such costly project. Our comment from having read and studied the two studies is that the difference lies not so much in how you calculate the cost of the individual decommissioning cost items, but rather more in how you control the basic costs such as the size of the management group in charge of the decommissioning, the time allotted for the project, the basic costs for the support and service staffs engaged in the project, and of course the execution of the actual decommissioning work. Experience shows that the method used today, where the decommissioning cost from a reference plant is

  15. Autonomous Control of Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Basher, H.

    2003-10-20

    A nuclear reactor is a complex system that requires highly sophisticated controllers to ensure that desired performance and safety can be achieved and maintained during its operations. Higher-demanding operational requirements such as reliability, lower environmental impacts, and improved performance under adverse conditions in nuclear power plants, coupled with the complexity and uncertainty of the models, necessitate the use of an increased level of autonomy in the control methods. In the opinion of many researchers, the tasks involved during nuclear reactor design and operation (e.g., design optimization, transient diagnosis, and core reload optimization) involve important human cognition and decisions that may be more easily achieved with intelligent methods such as expert systems, fuzzy logic, neural networks, and genetic algorithms. Many experts in the field of control systems share the idea that a higher degree of autonomy in control of complex systems such as nuclear plants is more easily achievable through the integration of conventional control systems and the intelligent components. Researchers have investigated the feasibility of the integration of fuzzy logic, neural networks, genetic algorithms, and expert systems with the conventional control methods to achieve higher degrees of autonomy in different aspects of reactor operations such as reactor startup, shutdown in emergency situations, fault detection and diagnosis, nuclear reactor alarm processing and diagnosis, and reactor load-following operations, to name a few. With the advancement of new technologies and computing power, it is feasible to automate most of the nuclear reactor control and operation, which will result in increased safety and economical benefits. This study surveys current status, practices, and recent advances made towards developing autonomous control systems for nuclear reactors.

  16. Long term commitments concerning decommissioning and waste management. French perspective

    Energy Technology Data Exchange (ETDEWEB)

    Milliat, Charles [EDF/CIDEN, 35/37, rue Louis-Guerin, BP 1212, 69611 Villeurbanne Cedex (France); Decobert, Guy [COGEMA/AREVA, 1 rue des Herons BP 302, Montigny-le-Bretonneux 78054 Saint Quentin en Yvelines (France); Pochon, Etienne [CEA/DEN/DPA, Centre de Saclay 91191 Gif sur Yvette Cedex (France)

    2006-07-01

    The majority of France decommissioning activities is occurring in two sectors: the civilian nuclear facilities and the nuclear facilities dedicated to deterrent. In France there are four major civilian operators: EDF (Electricite de France), AREVA, CEA (Commissariat a l'Energie Atomique) and ANDRA (Agence Nationale pour les Dechets Radioactifs). Nuclear energy provides France nearly 80% of its electricity. Presently there are 58 EDF's operating nuclear power plants (PWR), all the gas cooled graphite nuclear power plant (6 units) have been definitively shutdown as well as Superphenix, a fast breeder reactor. The fuel cycle industry belongs to AREVA which is operating all the industrial installations from uranium ore prospecting and mining till used fuel reprocessing. In France, most of the nuclear R and D installations belong to the CEA. Many installations have already been dismantled, are presently being dismantled or are on a waiting list (research reactors, laboratories, pilot plant, etc). ANDRA is in charge since 1991 of the studies and the operation of waste disposal centres (LLW, MLW, HLW and VLLW). The first repository for waste containing short lived radio nuclides (CM, Centre de la Manche) has been closed in 1994 after 25 years of operation, more of 530 000 m{sup 3} have been disposed, the Aube centre (CA) comes into operation in 1991 and has a capacity of 1 000 000 m{sup 3}, ANDRA has opened a disposal for very low level waste (VLLW), close to the Aube centre, in september 2003. The contents of the paper is as follows: I. Current status; II. National policy; III. Decommissioning technique and Inspection; IV. Radioactive waste management; V. Organisations and responsibilities; VI. Funding; VII. Competent bodies.

  17. Hg soil pollution around a decommissioned and unrestored Chlor-alkali plant: Jodar, Jaén province, SE Spain. Incidence in other environmental compartments.

    Science.gov (United States)

    López-Berdonces, Miguel Angel; María Esbrí, José; Lorenzo, Saturnino; Higueras, Pablo

    2014-05-01

    Data from soil pollution and its consequences around a decommissioned chlor-alkali plant are presented in this communication. The plant was active in the period 1977-1991, producing during these years a heavily pollution of Guadalquivir River and hidrargirism in more than local 45 workers. It is located at 7 km South of Jódar, a locality with some 12,120 inhabitants. Mercury usage was general in this type of plants, but at present it is being replaced by other types of technologies, due to the risks of mercury usage in personal and environment. A soil geochemistry survey was carried out in the area, together with the analysis of olive-tree leaves from the same area. 75 soil samples were taken at two different depths (0-15 cm. and 15-30 cm), together with 75 olive tree samples, 5 water samples. Besides, two monitoring surveys for total gaseous mercury in the atmosphere were performed. Mercury content of geologic and biologic samples was determined by means of Atomic Absorption Spectrometry with Zeeman Effect, using a Lumex RA-915+ device with the RP-91C pyrolysis attachment. Air surveys were carried our using a RA-915M Lumex portable analytical device, with GPS georreferenciation of the analysis points. Soil mercury contents were higher in topsoil than in the deeper soil samples, indicating that incorporation of mercury was due to dry and wet deposition of mercury vapors emitted from the plant. A local reference level was calculated as GM + 2SD (where GM is the geometric mean and SD the standard deviation). With this reference level it was possible to delimitate a contaminated soil area centered on the decommissioned chlor-alkali plant. A high affinity of local olive trees to accumulate mercury from the contaminated soil was also found, with a calculated maximum mercury content of 243.5 ng g-1. This maximum level is slightly higher than tolerable level for agronomic crops. Total mercury content in the analyzed waters was slightly higher than the chronic exposure

  18. Configuration management in nuclear power plants

    CERN Document Server

    2003-01-01

    Configuration management (CM) is the process of identifying and documenting the characteristics of a facility's structures, systems and components of a facility, and of ensuring that changes to these characteristics are properly developed, assessed, approved, issued, implemented, verified, recorded and incorporated into the facility documentation. The need for a CM system is a result of the long term operation of any nuclear power plant. The main challenges are caused particularly by ageing plant technology, plant modifications, the application of new safety and operational requirements, and in general by human factors arising from migration of plant personnel and possible human failures. The IAEA Incident Reporting System (IRS) shows that on average 25% of recorded events could be caused by configuration errors or deficiencies. CM processes correctly applied ensure that the construction, operation, maintenance and testing of a physical facility are in accordance with design requirements as expressed in the d...

  19. Risks of potential accidents of nuclear power plants in Europe

    NARCIS (Netherlands)

    Slaper H; Eggink GJ; Blaauboer RO

    1993-01-01

    Over 200 nuclear power plants for commercial electricity production are presently operational in Europe. The 1986 accident with the nuclear power plant in Chernobyl has shown that severe accidents with a nuclear power plant can lead to a large scale contamination of Europe. This report is focussed

  20. Risks of potential accidents of nuclear power plants in Europe

    NARCIS (Netherlands)

    Slaper H; Eggink GJ; Blaauboer RO

    1993-01-01

    Over 200 nuclear power plants for commercial electricity production are presently operational in Europe. The 1986 accident with the nuclear power plant in Chernobyl has shown that severe accidents with a nuclear power plant can lead to a large scale contamination of Europe. This report is focussed o

  1. Risks of potential accidents of nuclear power plants in Europe

    NARCIS (Netherlands)

    Slaper H; Eggink GJ; Blaauboer RO

    1993-01-01

    Over 200 nuclear power plants for commercial electricity production are presently operational in Europe. The 1986 accident with the nuclear power plant in Chernobyl has shown that severe accidents with a nuclear power plant can lead to a large scale contamination of Europe. This report is focussed

  2. Safety in nuclear power plants in India

    Directory of Open Access Journals (Sweden)

    Deolalikar R

    2008-01-01

    Full Text Available Safety in nuclear power plants (NPPs in India is a very important topic and it is necessary to dissipate correct information to all the readers and the public at large. In this article, I have briefly described how the safety in our NPPs is maintained. Safety is accorded overriding priority in all the activities. NPPs in India are not only safe but are also well regulated, have proper radiological protection of workers and the public, regular surveillance, dosimetry, approved standard operating and maintenance procedures, a well-defined waste management methodology, proper well documented and periodically rehearsed emergency preparedness and disaster management plans. The NPPs have occupational health policies covering periodic medical examinations, dosimetry and bioassay and are backed-up by fully equipped Personnel Decontamination Centers manned by doctors qualified in Occupational and Industrial Health. All the operating plants are ISO 14001 and IS 18001 certified plants. The Nuclear Power Corporation of India Limited today has 17 operating plants and five plants under construction, and our scientists and engineers are fully geared to take up many more in order to meet the national requirements.

  3. Safety in nuclear power plants in India.

    Science.gov (United States)

    Deolalikar, R

    2008-12-01

    Safety in nuclear power plants (NPPs) in India is a very important topic and it is necessary to dissipate correct information to all the readers and the public at large. In this article, I have briefly described how the safety in our NPPs is maintained. Safety is accorded overriding priority in all the activities. NPPs in India are not only safe but are also well regulated, have proper radiological protection of workers and the public, regular surveillance, dosimetry, approved standard operating and maintenance procedures, a well-defined waste management methodology, proper well documented and periodically rehearsed emergency preparedness and disaster management plans. The NPPs have occupational health policies covering periodic medical examinations, dosimetry and bioassay and are backed-up by fully equipped Personnel Decontamination Centers manned by doctors qualified in Occupational and Industrial Health. All the operating plants are ISO 14001 and IS 18001 certified plants. The Nuclear Power Corporation of India Limited today has 17 operating plants and five plants under construction, and our scientists and engineers are fully geared to take up many more in order to meet the national requirements.

  4. DCS emulator development for nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Nakashima, Y. [Hitachi Canada Ltd., Power and Industry Div., Mississauga, Ontario (Canada); Ishii, K.; Chiba, D. [Hitachi Ltd., Information and Control Systems Div., Ibaraki-ken (Japan)

    2009-07-01

    Continual training of operators is one of the principal means by which Nuclear Power Plant (NPP) operational efficiency can be improved. Since this training cannot take place in the actual NPP, NPP simulator applications must be used instead. While digitalization scope of Instrumentation and Control (I and C) systems has been expanded to the entire plant by using Distributed Control System (DCS) implementation, Hitachi has implemented DCS emulator on a general purpose Personal Computer (PC) and applied it to simulator applications. This paper reviews such DCS emulator development for NPP by Hitachi. (author)

  5. Safety in nuclear power plants in India

    OpenAIRE

    Deolalikar R

    2008-01-01

    Safety in nuclear power plants (NPPs) in India is a very important topic and it is necessary to dissipate correct information to all the readers and the public at large. In this article, I have briefly described how the safety in our NPPs is maintained. Safety is accorded overriding priority in all the activities. NPPs in India are not only safe but are also well regulated, have proper radiological protection of workers and the public, regular surveillance, dosimetry, approved standard operat...

  6. Operating experience with nuclear power plants 2015. Pt. 1

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    2016-07-01

    The VGB Technical Committee ''Nuclear Plant Operation'' has been exchanging operating experience about nuclear power plants for more than 30 years. Plant operators from several European countries are participating in the exchange. A report is given on the operating results achieved in 2015, events important to plant safety, special and relevant repair, and retrofit measures from Germany. The second part of this report will focus on nuclear power plant in Belgium, Finland, the Netherlands, Switzerland, and Spain.

  7. Decommissioning of DR 2. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Strufe, N.

    2009-02-15

    This report describes the work of dismantling and demolishing reactor DR 2, the waste volumes generated, the health physical conditions and the clearance procedures used for removed elements and waste. Since the ultimate goal for the decommissioning project was not clearance of the building, but downgrading the radiological classification of the building with a view to converting it to further nuclear use, this report documents how the lower classification was achieved and the known occurrence of remaining activity. The report emphasises some of the deliberations made and describes the lessons learned through this decommissioning project. The report also intends to contribute towards the technical basis and experience basis for further decommissioning of the nuclear facilities in Denmark. (au)

  8. Testing and Performance Validation of a Sensitive Gamma Ray Camera Designed for Radiation Detection and Decommissioning Measurements in Nuclear Facilities-13044

    Energy Technology Data Exchange (ETDEWEB)

    Mason, John A.; Looman, Marc R.; Poundall, Adam J.; Towner, Antony C.N. [ANTECH, A. N. Technology Ltd., Unit 6, Thames Park, Wallingford, Oxfordshire, OX10 9TA (United Kingdom); Creed, Richard; Pancake, Daniel [Argonne National Laboratory, 9700 South Cass Avenue, Lemont, IL 60439 (United States)

    2013-07-01

    This paper describes the measurements, testing and performance validation of a sensitive gamma ray camera designed for radiation detection and quantification in the environment and decommissioning and hold-up measurements in nuclear facilities. The instrument, which is known as RadSearch, combines a sensitive and highly collimated LaBr{sub 3} scintillation detector with an optical (video) camera with controllable zoom and focus and a laser range finder in one detector head. The LaBr{sub 3} detector has a typical energy resolution of between 2.5% and 3% at the 662 keV energy of Cs-137 compared to that of NaI detectors with a resolution of typically 7% to 8% at the same energy. At this energy the tungsten shielding of the detector provides a shielding ratio of greater than 900:1 in the forward direction and 100:1 on the sides and from the rear. The detector head is mounted on a pan/tile mechanism with a range of motion of ±180 degrees (pan) and ±90 degrees (tilt) equivalent to 4 π steradians. The detector head with pan/tilt is normally mounted on a tripod or wheeled cart. It can also be mounted on vehicles or a mobile robot for access to high dose-rate areas and areas with high levels of contamination. Ethernet connects RadSearch to a ruggedized notebook computer from which it is operated and controlled. Power can be supplied either as 24-volts DC from a battery or as 50 volts DC supplied by a small mains (110 or 230 VAC) power supply unit that is co-located with the controlling notebook computer. In this latter case both power and Ethernet are supplied through a single cable that can be up to 80 metres in length. If a local battery supplies power, the unit can be controlled through wireless Ethernet. Both manual operation and automatic scanning of surfaces and objects is available through the software interface on the notebook computer. For each scan element making up a part of an overall scanned area, the unit measures a gamma ray spectrum. Multiple

  9. CONSIDERATIONS FOR THE DEVELOPMENT OF A DEVICE FOR THE DECOMMISSIONING OF THE HORIZONTAL FUEL CHANNELS IN THE CANDU 6 NUCLEAR REACTOR. PART 9 - CUTTING AND EXTRACTING DEVICE FUNCTIONING

    Directory of Open Access Journals (Sweden)

    Constantin POPESCU

    2015-05-01

    Full Text Available This paper presents a constructive solution proposed by the authors in order to achieve of a cutting and extracting device for the decommissioning of the horizontal fuel channels in the CANDU 6 nuclear reactor. The Cutting and Extraction Device (CED performs the dismantling, cutting and extraction of the fuel channel components. It's a flexible and modular device, which is designed to work inside the fuel channel and has the following functions: moving with variable speed, temperature monitoring and video surveillance inside the pipe, unblock and extract the channel closure plug (from End Fitting - EF, unblock and extract the channel shield plug (from Lattice Tube - LT, block and cut the middle of the pressure tube, block and cut the end of the pressure tube, block and extract the half of pressure tube. The Cutting and Extraction Device (CED consists of following modules: guiding-fixing module, traction modules, cutting module, guiding-extracting module and flexible elements for modules connecting. The guiding-fixing module is equipped with elastic guiding rollers and fixing claws in working position, the traction modules are provided with variable pitch rollers for allowing variable travel speed through the fuel channel. The cutting module is positioned in the middle of the device and it is equipped with three knife rolls for pressure tube cutting, using a system for cutting place video surveillance and pyrometers for monitoring cutting place temperature. The Cutting and Extraction Device (CED is fully automated, connected by wires to a Programmable Logic Controller (PLC and controlled from a Human Machine Interface (HMI. The design of the Cutting and Extraction Device (CED shall be achieved according to the particular features of the fuel channel components to be dismantled and to ensure radiation protection of workers.

  10. 77 FR 30030 - Monitoring the Effectiveness of Maintenance at Nuclear Power Plants

    Science.gov (United States)

    2012-05-21

    ... COMMISSION Monitoring the Effectiveness of Maintenance at Nuclear Power Plants AGENCY: Nuclear Regulatory... Maintenance at Nuclear Power Plants.'' This guide endorses Revision 4A to Nuclear Management and Resources... Effectiveness of Maintenance at Nuclear Power Plants,'' Part 50, ``Domestic......

  11. Status of nuclear energy and nuclear safety in Slovenia

    Energy Technology Data Exchange (ETDEWEB)

    Grlicarev, I. [Slovenian Nuclear Safety Administration (Slovenia)

    2002-07-01

    Although in Slovenia there is only one nuclear power plant in operation, it represents a substantial share in the production of electrical power in the country. Nuclear fuel cycle in Slovenia comprises the nuclear power plant, a research reactor, a storage for low and intermediate level radioactive waste and uranium mine in decommissioning. The Krsko NPP operation meets the standards of the high level of nuclear safety. Considerable effort has been put into the negotiations in the field of nuclear energy and nuclear safety with the European Commission within the pre-accession activities of Slovenia to European Union. (orig.)

  12. Operation and dismantling report 2004 for Danish Decommissioning; Drifts- og afviklingsrapport 2004 - Dansk Dekommissionering

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-03-01

    The report describes the operations at Danish Decommissioning (DD) that are essential for the nuclear inspection authorities' assessment of safety related issues. The report presents an account of safety and of the work at DD, including the decommissioning projects in 2004 for the nuclear facilities. The radioactive waste treatment facility in operation is described, and inspection and maintenance reports of the nuclear facilities prepared for decommissioning are presented. (ln)

  13. China’s Nuclear Power Plants in Operation

    Institute of Scientific and Technical Information of China (English)

    2011-01-01

    Qinshan Plant Phase I Located in Haiyan,Zhejiang Province,Qinshan Nuclear Power Plant Phase I is t he first 300-megawatt pressurized water reactor (PWR) nuclear power plant independently designed,constructed,operated and managed by China.The plant came into commercial operation in April 1994.

  14. Fatigue monitoring in Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Ware, A.G.; Shah, V.N. [Idaho National Engineering Laboratory, Idaho Falls, ID (United States)

    1995-04-01

    This paper summarizes fatigue monitoring methods and surveys their application in the nuclear power industry. The paper is based on a review of the technical literature. Two main reasons for fatigue monitoring are more frequent occurrence of some transients than that assumed in the fatigue design analysis and the discovery of stressors that were not included in the fatigue design analysis but may cause significant fatigue damage at some locations. One fatigue monitoring method involves use of plant operating data and procedures to update the fatigue usage. Another method involves monitoring of plant operating parameters using existing, or if needed, supplementary plant instrumentation for online computation of fatigue usage. Use of fatigue monitoring has better defined the operational transients. Most operational transients have been found less severe and fewer in numbers than anticipated in the design fatigue analysis. Use of fatigue monitoring has assisted in quantifying newly discovered stressors and has helped in detecting the presence of thermal stratification of unsuspected locations.

  15. Exergoeconomic analysis of a nuclear power plant

    Science.gov (United States)

    Moreno, Roman Miguel

    Exergoeconomic analysis of a nuclear power plant is a focus of this dissertation. Specifically, the performance of the Palo Verde Nuclear Power Plant in Arizona is examined. The analysis combines thermodynamic second law exergy analysis with economics in order to assign costs to the loss and destruction of exergy. This work was done entirely with an interacting spreadsheets notebook. The procedures are to first determine conventional energy flow, where the thermodynamic stream state points are calculated automatically. Exergy flow is then evaluated along with destruction and losses. The capital cost and fixed investment rate used for the economics do not apply specifically to the Palo Verde Plant. Exergy costing is done next involving the solution of about 90 equations by matrix inversion. Finally, the analysis assigns cost to the exergy destruction and losses in each component. In this work, the cost of electricity (exergy), including capital cost, leaving the generator came to 38,400 /hr. The major exergy destruction occurs in the reactor where fission energy transfer is limited by the maxiμm permissible clad temperature. Exergy destruction costs were: reactor--18,207 hr, the low pressure turbine-2,000 /hr, the condenser--1,700 hr, the steam generator-1,200 $/hr. The inclusion of capital cost and O&M are important in new system design assessments. When investigating operational performance, however, these are sunk costs; only fuel cost needs to be considered. The application of a case study is included based on a real modification instituted at Palo Verde to reduce corrosion steam generator problems; the pressure in the steam generator was reduced from 1072 to 980 psi. Exergy destruction costs increased in the low pressure turbine and in the steam generator, but decreased in the reactor vessel and the condenser. The dissertation demonstrates the procedures and tools required for exergoeconomic analysis whether in the evaluation of a new nuclear reactor system

  16. Evaluation of nuclear facility decommissioning projects: Summary status report: Three Mile Island Unit 2. Radioactive waste and laundry shipments

    Energy Technology Data Exchange (ETDEWEB)

    Doerge, D. H.; Haffner, D. R.

    1988-06-01

    This document summarizes information concerning radioactive waste and laundry shipments from the Three Mile Island Nuclear Station Unit 2 to radioactive waste disposal sites and to protective clothing decontamination facilities (laundries) since the loss of coolant accident experienced on March 28, 1979. Data were collected from radioactive shipment records, summarized, and placed in a computerized data information retrieval/manipulation system which permits extraction of specific information. This report covers the period of April 9, 1979 through April 19, 1987. Included in this report are: waste disposal site locations, dose rates, curie content, waste description, container type and number, volumes and weights. This information is presented in two major categories: protective clothing (laundry) and radioactive waste. Each of the waste shipment reports is in chronological order.

  17. Nuclear power plant operation and training

    Energy Technology Data Exchange (ETDEWEB)

    Sanae, Katsushige [Tokyo Electric Power Co., Inc. (Japan); Mitsumori, Kojiro

    1997-07-01

    In this report, the system for operation of a nuclear power plant and the qualities required for its operators were summarized. In Kashiwazaki-Kariwa Atomic Power Plant of the Tokyo Electric Power Co., Inc. operation is continuously made by 6 groups containing each 10 workers on three shifts. A group including the person in charge participates in the operation through cooperation of the control center and the respective spots. The group leaders are chosen from those approved as a person responsible to its operation. The conditions for the person responsible were as follows: to receive simulator training for senior operator, to have more than 7 years experience of operating a nuclear power plant, to pass a practical examination on the ordinary operation and the emergency one, to receive a training course to master the knowledge and techniques for operating an atomic reactor and to success the oral examination on practical knowledge required to perform the duty. Further, the simulators for ABWR training produced by Toshiba Corp. and Hitachi Ltd. were introduced as an example. And the practical training procedures to manipulate the simulator were presented. (M.N.)

  18. The fourth nuclear power plant in Argentina

    Energy Technology Data Exchange (ETDEWEB)

    Nogarin, Mauro

    2017-01-15

    Since 2006 the nuclear sector in Argentina has aimed at recovering and strengthening its capabilities and facilities. Part of the challenge posed by this revival has been to also accompany the development of activities with a higher level of responsibility for safety and the environment. Among the strategic decisions taken in recent years, one main highlight is the construction of the nuclear power plant CAREM25 entirely with Argentine technology and design under the responsibility of the National Atomic Energy Commission. On February 4, 2015, the Ministry of Federal Planning and the National Energy Administration (NEA) signed the agreement for cooperation and construction of pressurized water reactor (PWR) with ACP-1000 technology, developed in the Peoples Republic of China.

  19. Development of higher-ranking standards with respect to fire protection for nuclear facilities in the area decommissioning and disposal; Entwicklung eines uebergeordneten Standards im Hinblick auf Brandschutzmassnahmen fuer kerntechnische Anlagen im Bereich Stilllegung und Entsorgung

    Energy Technology Data Exchange (ETDEWEB)

    Mummert, Maxi; Sonneborn, Volker; Dilger, Matthias; Traichel, Anke [NUKEM Technologies GmbH, Alzenau (Germany). Safety Engineering and Assessment

    2013-07-01

    In the frame of NPP decommissioning and dismantling besides operational waste the large components have to be processes. The licensing of conditioning and storage facilities at the site requires the fulfillment of protection targets, especially the protection of the public and the environment from radioactivity. This contribution deals with the fire as internal incident. The analysis includes deterministic and probabilistic methods. The project is aimed to the development of a fire protection concept according differing national requirements and the adaption of a probabilistic fire risk analysis for non-reactor nuclear facilities.

  20. 76 FR 75771 - Emergency Planning Guidance for Nuclear Power Plants

    Science.gov (United States)

    2011-12-05

    ... Part 52 RIN 3150-AI10 Emergency Planning Guidance for Nuclear Power Plants AGENCY: Nuclear Regulatory... Regulatory Commission (NRC) is issuing Supplement 3, ``Guidance for Protective Action Strategies,'' to NUREG... Guidance Emergency Planning for Nuclear Power Plants;'' and NUREG/CR-7002, ``Criteria for Development of...

  1. U.S. experience with organizational issues during decommissioning

    Energy Technology Data Exchange (ETDEWEB)

    Durbin, N.E. [MPD Consulting, Kirkland, WA (United States); Harty, R. [Battelle Pacific Northwest National Laboratory, Richland, WA (United States)

    1998-01-01

    The report provides information from a variety of sources, including interviews with US NRC management and staff, interviews and discussions with former employees of a decommissioned plant, discussions with subject matter experts, and relevant published documents. The NRC has modified its rule regarding decommissioning requirements. Two key reasons for these modifications are that plants have been decommissioning early and for economic reasons instead of at the end of their license period and, a desire for a more efficient rule that would more effectively use NRC staff. NRC management and staff expressed the opinion that resource requirements for the regulatory have been higher than anticipated. Key observations about decommissioning included that: The regulator faces new challenges to regulatory authority and performance during decommissioning. The public concern over decommissioning activities can be very high. There are changes in the types of safety concerns during decommissioning. It is important to balance planning and the review of plans with verification of activities. There are important changes in the organizational context at the plant during decommissioning. Retention of key staff is important. In particular, the organizational memory about the plant that is in the staff should not be lost. Six key areas of risk during decommissioning are fuel storage, potential accidents that could cause an offsite release, inappropriate release of contaminated material, radiation protection of workers, industrial accidents, and shipment of hazardous materials. Deconstruction of one unit while a co-located unit is still operating could create risks with regard to shared systems, specific risks of dismantling activities and coordination and management. Experience with co-located units at one site in the US was that there was a lack of attention to the decommissioning plant.

  2. U.S. experience with organizational issues during decommissioning

    Energy Technology Data Exchange (ETDEWEB)

    Durbin, N.E. [MPD Consulting, Kirkland, WA (United States); Harty, R. [Battelle Pacific Northwest National Laboratory, Richland, WA (United States)

    1998-01-01

    The report provides information from a variety of sources, including interviews with US NRC management and staff, interviews and discussions with former employees of a decommissioned plant, discussions with subject matter experts, and relevant published documents. The NRC has modified its rule regarding decommissioning requirements. Two key reasons for these modifications are that plants have been decommissioning early and for economic reasons instead of at the end of their license period and, a desire for a more efficient rule that would more effectively use NRC staff. NRC management and staff expressed the opinion that resource requirements for the regulatory have been higher than anticipated. Key observations about decommissioning included that: The regulator faces new challenges to regulatory authority and performance during decommissioning. The public concern over decommissioning activities can be very high. There are changes in the types of safety concerns during decommissioning. It is important to balance planning and the review of plans with verification of activities. There are important changes in the organizational context at the plant during decommissioning. Retention of key staff is important. In particular, the organizational memory about the plant that is in the staff should not be lost. Six key areas of risk during decommissioning are fuel storage, potential accidents that could cause an offsite release, inappropriate release of contaminated material, radiation protection of workers, industrial accidents, and shipment of hazardous materials. Deconstruction of one unit while a co-located unit is still operating could create risks with regard to shared systems, specific risks of dismantling activities and coordination and management. Experience with co-located units at one site in the US was that there was a lack of attention to the decommissioning plant.

  3. Decontamination, decommissioning, and vendor advertorial issue, 2006

    Energy Technology Data Exchange (ETDEWEB)

    Agnihotri, Newal (ed.)

    2006-07-15

    The focus of the July-August issue is on Decontamination, decommissioning, and vendor advertorials. Major articles/reports in this issue include: NPP Krsko revised decommissioning program, by Vladimir Lokner and Ivica Levanat, APO d.o.o., Croatia, and Nadja Zeleznik and Irena Mele, ARAO, Slovenia; Supporting the renaissance, by Marilyn C. Kray, Exelon Nuclear; Outage world an engineer's delight, by Tom Chrisopher, Areva, NP Inc.; Optimizing refueling outages with R and D, by Ross Marcoot, GE Energy; and, A successful project, by Jim Lash, FirstEnergy.

  4. Estimating boiling water reactor decommissioning costs: A user`s manual for the BWR Cost Estimating Computer Program (CECP) software. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Bierschbach, M.C. [Pacific Northwest National Lab., Richland, WA (United States)

    1996-06-01

    Nuclear power plant licensees are required to submit to the US Nuclear Regulatory Commission (NRC) for review their decommissioning cost estimates. This user`s manual and the accompanying Cost Estimating Computer Program (CECP) software provide a cost-calculating methodology to the NRC staff that will assist them in assessing the adequacy of the licensee submittals. The CECP, designed to be used on a personal computer, provides estimates for the cost of decommissioning boiling water reactor (BWR) power stations to the point of license termination. Such cost estimates include component, piping, and equipment removal costs; packaging costs; decontamination costs; transportation costs; burial costs; and manpower costs. In addition to costs, the CECP also calculates burial volumes, person-hours, crew-hours, and exposure person-hours associated with decommissioning.

  5. Affective imagery and acceptance of replacing nuclear power plants.

    Science.gov (United States)

    Keller, Carmen; Visschers, Vivianne; Siegrist, Michael

    2012-03-01

    This study examined the relationship between the content of spontaneous associations with nuclear power plants and the acceptance of using new-generation nuclear power plants to replace old ones. The study also considered gender as a variable. A representative sample of the German- and French-speaking population of Switzerland (N= 1,221) was used. Log-linear models revealed significant two-way interactions between the association content and acceptance, association content and gender, and gender and acceptance. Correspondence analysis revealed that participants who were opposed to nuclear power plants mainly associated nuclear power plants with risk, negative feelings, accidents, radioactivity, waste disposal, military use, and negative consequences for health and environment; whereas participants favoring nuclear power plants mainly associated them with energy, appearance descriptions of nuclear power plants, and necessity. Thus, individuals opposing nuclear power plants had both more concrete and more diverse associations with them than people who were in favor of nuclear power plants. In addition, participants who were undecided often mentioned similar associations to those participants who were in favor. Males more often expressed associations with energy, waste disposal, and negative health effects. Females more often made associations with appearance descriptions, negative feelings, and negative environmental effects. The results further suggest that acceptance of replacing nuclear power plants was higher in the German-speaking part of the country, where all of the Swiss nuclear power plants are physically located. Practical implications for risk communication are discussed.

  6. Operating experience from Swedish nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-06-01

    During 1997 the PWRs in Ringhals performed extremely well (capability factors 85-90%), the unit Ringhals 2 reached the best capability factor since commercial operation started in 1976. The BWRs made an average 76% capability, which is somewhat less than in 1996. The slightly reduced capability derives from ongoing modernization projects at several units. At the youngest plants, Forsmark 3 and Oskarshamn 3, capability and utilization were very high. Events and data for 1997 are given for each reactor, together with operational statistics for the years 1990-1997. A number of safety-related events are reported, which occurred st the Swedish plants during 1997. These events are classified as level 1 or higher on the international nuclear event scale (INES).

  7. A model study of cost estimates of decontamination and decommissioning with an emphasis to derive cost functions for alpha contaminated material using OMEGA code

    Energy Technology Data Exchange (ETDEWEB)

    Kristofova, Kristina; Daniska, Vladimir; Ondra, Frantisek; Rehak, Ivan; Vasko, Marek [DECOM SLOVAKIA spol. s.r.o., Trnava (Slovakia)

    2004-12-01

    The presented study is focused on model decommissioning cost calculations for primary circuit of A-1 nuclear power plant in Jaslovske Bohunice. In addition, the survey of advanced decommissioning costing is included together with impact analyses of contamination on particular decommissioning parameters. OMEGA code decommissioning cost calculations for primary circuit of A-1 NPP presented in the study are performed and evaluated under the following conditions: different contamination level of inner and outer surfaces; different waste management scenarios; application and non-application of pre-dismantling decontamination; different start of decommissioning: 2004, 2010, 2020, 2030, 2040; radionuclide composition of primary circuit contamination in A-1 NPP with occurrence of alpha radionuclides and fission products as a consequence of operational accident with damaged fuel cladding; radionuclide composition of primary circuit contamination in V-2 NPP in Jaslovske Bohunice as a representative NPP with an operation without accidents and therefore neither non-alpha contaminants nor fission products are included. The results of all the above mentioned conditions impacts on calculated costs, manpower, exposure and distribution of materials arisen from decommissioning are evaluated in detail within the calculation sensitivity analysis.

  8. General digitalized system on nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Akagi, Katsumi; Kadohara, Hozumi; Taniguchi, Manabu [Mitsubishi Electric Corp., Tokyo (Japan)

    2000-08-01

    Hitherto, instrumentation control system in a PWR nuclear power plant has stepwisely adopted digital technology such as application of digital instrumentation control device to ordinary use (primary/secondary system control device, and so on), application of CRT display system to monitoring function, and so forth, to realize load reduction of an operator due to expansion of operation automation range, upgrading of reliability and maintenance due to self-diagnosis function, reduction of mass in cables due to multiple transfer, and upgrading of visual recognition due to information integration. In next term PWR plant instrumentation control system, under consideration of application practice of conventional digital technology, application of general digitalisation system to adopt digitalisation of overall instrumentation control system containing safety protection system, and central instrumentation system (new type of instrumentation system) and to intend to further upgrade economics, maintenance, operability/monitoring under security of reliability/safety is planned. And, together with embodiment of construction program of the next-term plant, verification at the general digitalisation proto-system aiming at establishment of basic technology on the system is carried out. Then, here was described on abstract of the general digitalisation system and characteristics of a digital type safety protection apparatus to be adopted in the next-term plant. (G.K.)

  9. Survey of Swiss nuclear's cost study 2016; Pruefung der Kostenstudie 2016 von swissnuclear

    Energy Technology Data Exchange (ETDEWEB)

    Alt, Stefan; Ustohalova, Veronika [Oeko-Institut e.V. - Institut fuer Angewandte Oekologie, Freiburg im Breisgau (Germany)

    2017-04-26

    The report discusses the Swiss nuclear cost study 2016 concerning the following issues: evaluation of the aspects of the cost study: cost structure, cost classification and risk provision, additional payment liability, option of lifetime extension for Swiss nuclear power plants; specific indications on the report ''cost study 2016 (KS16) - estimation of the decommissioning cost of Swiss nuclear power plants'': decommissioning costs in Germany, France and the USA, indexing the Swiss cost estimation for decommissioning cost, impact factors on the decommissioning costs; specific indications on the report ''cost study 2016 (KS16) - estimation of the disposal cost - interim storage, transport, containers and reprocessing''; specific indications on the report ''cost studies (KS16) - estimation of disposal costs - geological deep disposal'': time scale and costs incurred, political/social risks, retrievability, comparison with other mining costs.

  10. Operating results 2015. Nuclear power plants. Pt. 1

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    2016-05-15

    A report is given on the opening results achieved in 2015, events important to plant safety, special and relevant repair, and retrofit measures from nuclear power plants in Germany. Reports about nuclear power plants in Belgium, Finland, the Netherlands, Switzerland, and Spain will be published in further issue.

  11. Radiological Impacts Assessment during Normal Decommissioning Operation for EU-APR

    Energy Technology Data Exchange (ETDEWEB)

    Hwang, Do Hyun; Lee, Keun Sung [KHNP CRI, Daejeon (Korea, Republic of); Lee, ChongHui [KEPCO Engineering and Construction, Gimcheon (Korea, Republic of)

    2016-10-15

    In this paper, radiological impacts on human beings during normal execution of the decommissioning operations from the current standard design of EU-APR which has been modified and improved from its original design of APR1400 to comply with EUR, are evaluated. Decommissioning is the final phase in the life cycle of a nuclear installation, covering all activities from shutdown and removal of fissile material to environmental restoration of the site. According to article 5.4 specified in chapter 2.20 of European Utility Requirements (EUR), all relevant radiological impacts on human being should be considered during the environmental assessment of decommissioning, including external exposure from direct radiation of plant and other radiation sources, and internal exposure due to inhalation and ingestion. In this paper, radiological impacts on human beings during normal circumstances of the decommissioning operation were evaluated from the current standard design of EU-APR based on the simple transport model and practical generic methodology for assessing the radiological impact provided by IAEA. The results of dose assessment fulfilled the dose limit for all scenarios.

  12. Standard Guide for Radiation Protection Program for Decommissioning Operations

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    1987-01-01

    1.1 This guide provides instruction to the individual charged with the responsibility for developing and implementing the radiation protection program for decommissioning operations. 1.2 This guide provides a basis for the user to develop radiation protection program documentation that will support both the radiological engineering and radiation safety aspects of the decommissioning project. 1.3 This guide presents a description of those elements that should be addressed in a specific radiation protection plan for each decommissioning project. The plan would, in turn, form the basis for development of the implementation procedures that execute the intent of the plan. 1.4 This guide applies to the development of radiation protection programs established to control exposures to radiation and radioactive materials associated with the decommissioning of nuclear facilities. The intent of this guide is to supplement existing radiation protection programs as they may pertain to decommissioning workers, members of...

  13. Revised analyses of decommissioning for the reference boiling water reactor power station. Effects of current regulatory and other considerations on the financial assurance requirements of the decommissioning rule and on estimates of occupational radiation exposure: Appendices, draft report for comment. Volume 2

    Energy Technology Data Exchange (ETDEWEB)

    Smith, R.I.; Bierschbach, M.C.; Konzek, G.J. [Pacific Northwest Lab., Richland, WA (United States)] [and others

    1994-09-01

    On June 27, 1988, the U.S. Nuclear Regulatory Commission (NRC) published in the Federal Register (53 FR 24018) the final rule for the General Requirements for Decommissioning Nuclear Facilities. With the issuance of the final rule, owners and operators of licensed nuclear power plants are required to prepare, and submit to the NRC for review, decommissioning plans and cost estimates. The NRC staff is in need of updated bases documentation that will assist them in assessing the adequacy of the licensee submittals, from the viewpoint of both the planned actions, including occupational radiation exposure, and the probable costs. The purpose of this reevaluation study is to update the needed bases documentation. This report presents the results of a review and reevaluation of the PNL 1980 decommissioning study of the Washington Public Power Supply System`s WNP-2, including all identifiable factors and cost assumptions which contribute significantly to the total cost of decommissioning the plant for the DECON, SAFSTOR, and ENTOMB decommissioning alternatives, which now include an initial 5-7 year period during which time the spent fuel is stored in the spent fuel pool prior to beginning major disassembly or extended safe storage of the plant. This report also includes consideration of the NRC requirement that decontamination and decommissioning activities leading to termination of the nuclear license be completed within 60 years of final reactor shutdown, consideration of packaging and disposal requirements for materials whose radionuclide concentrations exceed the limits for Class C low-level waste. Costs for labor, materials, transport, and disposal activities are given in 1993 dollars. Sensitivities of the total license termination cost to the disposal costs at different low-level radioactive waste disposal sites, to different depths of contaminated concrete surface removal within the facilities, and to different transport distances are also examined.

  14. Change-management. From commercial power operation to post power operation and decommissioning; Change-Management. Vom Leistungsbetrieb ueber den Nachbetrieb zum Rueckbau. T. 1. Stilllegung und Rueckbau von Reaktoren und Anlagen im Brennstoffkreislauf durch AREVA

    Energy Technology Data Exchange (ETDEWEB)

    Wasinger, Karl [AREVA GmbH, Offenbach am Main (Germany)

    2015-02-15

    Transition from power generation to decommissioning challenges utilities. Power generation is mainly characterized by a stable working environment and constant workload, decommissioning and dismantling, however, by transformation and change. Also, changing requirements for the workforce's skills challenge the organization and its senior management. Ensuring effective and efficient performance, while maintaining motivation of staff, requires adjustment of management processes as well as of operational organization and human resources management. AREVA has more than 20 years of experience in decommissioning of own nuclear fuel cycle plants in France, as well as of other large plants and power reactors in Germany, the United Kingdom and the US. Therefore, the group has developed and successfully implemented integrated change management processes. The implementation of well-established and proven methods, developed by the productive industry and adjusted to the nuclear regulatory requirements, significantly improves the performance and efficiency of means and methods in use. The AREVA Performance Improvement Process defines concrete approaches to identify and improve potential deficits of productivity in six main areas (decommissioning scenarios and stra-tegies, waste treatment and logistics, operations management, supply chain, regulatory monitoring and controls as well as dismantling operation). Nuclear plant and facility owners around the world benefit from AREVA experts well experienced in execution of large and complex decommissioning projects.

  15. Nuclear power's mysterious afterlife

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    1991-10-10

    As the number of nuclear reactors which have reached the end of their service life or will do so by the end of the 1990s grows, nuclear power plant decommissioning is becoming a major issue. A table shows more than thirty reactors in Germany, France, Italy, Spain and the UK are candidates for decommissioning. Definite plans and cost estimates are being demanded of the plant owners. However it is becoming clear that even the USA, which has the greatest decommissioning experience, has not had to deal with the large reactors which now have to be dealt with. The experience and progress of decommissioning in the UK, France, Germany and the rest of Europe is reviewed. Problems of disposing of the mainly low-level radio-active wastes generated by decommissioning are discussed. The estimation of costs has become complicated by the idea of discounting costs which means relatively small sums set aside now will be sufficient to pay for the decommissioning in the decades to come. (UK).

  16. Nuclear Regulatory Commission issuances, January 1997. Volume 45, Number 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-01-01

    This book contains issuances of the Atomic Safety and Licensing Board, Nuclear Regulatory Commission and Director`s Decision for January 1997. The issuances concern Sequoyah Fuels Corporation and General Atomics Gore, Oklahoma Site decontamination and decommissioning funding; Louisiana Energy Services, Claiborne Enrichment Center denies appeal to review emergency planning; General Public Utilities Nuclear Corporation, Oyster Creek Nuclear Generating station, challenges to technical specifications concerning spent fuel pool; and Consumers Power Company, Palisades Nuclear Plant dry cask storage of spent nuclear fuel.

  17. Nuclear power generation and fuel cycle report 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-10-01

    This report presents the current status and projections through 2015 of nuclear capacity, generation, and fuel cycle requirements for all countries using nuclear power to generate electricity for commercial use. It also contains information and forecasts of developments in the worldwide nuclear fuel market. Long term projections of U.S. nuclear capacity, generation, and spent fuel discharges for two different scenarios through 2040 are developed. A discussion on decommissioning of nuclear power plants is included.

  18. 76 FR 55137 - Monitoring the Effectiveness of Maintenance at Nuclear Power Plants

    Science.gov (United States)

    2011-09-06

    ... COMMISSION Monitoring the Effectiveness of Maintenance at Nuclear Power Plants AGENCY: Nuclear Regulatory..., ``Monitoring the Effectiveness of Maintenance at Nuclear Power Plants.'' This guide endorses Revision 4A to... Effectiveness of Maintenance at Nuclear Power Plants,'' which provides methods that......

  19. Nuclear power plant Severe Accident Research Plan

    Energy Technology Data Exchange (ETDEWEB)

    Larkins, J T; Cunningham, M A

    1983-01-01

    The Severe Accident Research Plan (SARP) will provide technical information necessary to support regulatory decisions in the severe accident area for existing or planned nuclear power plants, and covers research for the time period of January 1982 through January 1986. SARP will develop generic bases to determine how safe the plants are and where and how their level of safety ought to be improved. The analysis to address these issues will be performed using improved probabilistic risk assessment methodology, as benchmarked to more exact data and analysis. There are thirteen program elements in the plan and the work is phased in two parts, with the first phase being completed in early 1984, at which time an assessment will be made whether or not any major changes will be recommended to the Commission for operating plants to handle severe accidents. Additionally at this time, all of the thirteen program elements in Chapter 5 will be reviewed and assessed in terms of how much additional work is necessary and where major impacts in probabilistic risk assessment might be achieved. Confirmatory research will be carried out in phase II to provide additional assurance on the appropriateness of phase I decisions. Most of this work will be concluded by early 1986.

  20. Design and implementation of the decontamination and dismantling technology retrieval system for decommissioned nuclear facilities%核设施退役去污拆除工艺检索系统设计与实现

    Institute of Scientific and Technical Information of China (English)

    王双宇; 刘永阔; 李梦堃; 晁楠

    2015-01-01

    核设施退役工程实施过程主要包括去污、切割和拆除。去污、切割和拆除又包含了多种不同的技术方法,这些技术原理不同,效果不同,代价也不同。因此,有必要开发一个针对核设施退役工程实施技术的检索系统。在此开发了一个核设施退役去污拆除工艺检索系统,通过对数据库中的信息进行简单的检索,根据输入的检索条件得到满足检索要求的检索信息,从而使使用者了解退役去污、切割和拆除技术等的相关信息。开发的工艺检索系统能够实现对去污技术、拆除技术、拆除工具和防护工具的添加、管理和检索操作以及法律规程浏览和数据管理等。该系统能够为核设施退役工程决策和实施过程中提供理论依据和辅助决策,以便更好地辅助核设施退役工程的实施。%The implementation process of a nuclear facility decommissioning project mainly includes decontamina⁃tion, cutting and removal. These processes also contain a variety of technical methods and principles, which have different effects and costs. Therefore, it is necessary to develop a retrieval system for the nuclear facility decommis⁃sioning project. This study developed a retrieval system for the process of decommissioning, decontamination, and demolition of nuclear facilities. The system can simply retrieve the database and get the information that satisfies the retrieval requirement according to the input retrieval condition, so that users can learn the relevant information a⁃bout the decommissioning decontamination, cutting and removal technology, etc. This system can realize the adding, management and retrieval operations of the decontamination technology, demolition technology, demolition tools and protection tools, and browse of laws and regulations, and data management, etc. This system is able to provide a theoretical basis and make auxiliary decisions for nuclear facility

  1. Revised analyses of decommissioning for the reference boiling water reactor power station. Effects of current regulatory and other considerations on the financial assurance requirements of the decommissioning rule and on estimates of occupational radiation exposure - appendices. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Smith, R.I.; Bierschbach, M.C.; Konzek, G.J.; McDuffie, P.N.

    1996-07-01

    The NRC staff is in need of decommissioning bases documentation that will assist them in assessing the adequacy of the licensee submittals, from the viewpoint of both the planned actions, including occupational radiation exposure, and the probable costs. The purpose of this reevaluation study is to update the needed bases documentation. This report presents the results of a review and reevaluation of the PNL 1980 decommissioning study of the Washington Public Power Supply System`s Washington Nuclear Plant Two (WNP-2) located at Richland, Washington, including all identifiable factors and cost assumptions which contribute significantly to the total cost of decommissioning the plant for the DECON, SAFSTOR, and ENTOMB decommissioning alternatives. These alternatives now include an initial 5-7 year period during which time the spent fuel is stored in the spent fuel pool prior to beginning major disassembly or extended safe storage of the plant. Included for information (but not presently part of the license termination cost) is an estimate of the cost to demolish the decontaminated and clear structures on the site and to restore the site to a {open_quotes}green field{close_quotes} condition. This report also includes consideration of the NRC requirement that decontamination and decommissioning activities leading to termination of the nuclear license be completed within 60 years of final reactor shutdown, consideration of packaging and disposal requirements for materials whose radionuclide concentrations exceed the limits for Class C low-level waste (i.e., Greater-Than-Class C), and reflects 1993 costs for labor, materials, transport, and disposal activities. Sensitivity of the total license termination cost to the disposal costs at different low-level radioactive waste disposal sites, to different depths of contaminated concrete surface removal within the facilities, and to different transport distances is also examined.

  2. Dosimetry in nuclear power plants; Dosimetria en centrales nucleares

    Energy Technology Data Exchange (ETDEWEB)

    Lastra B, J. A. [CFE, Central Laguna Verde, Km. 42.5 Carretera Cardel-Nautla, Veracruz (Mexico)

    2008-12-15

    To control the occupationally exposed personnel dose working at the Laguna Verde nuclear power plant, two types of dosemeters are used, the thermoluminescent (TLD) which is processed monthly, and the direct reading dosemeter that is electronic and works as daily control of personal dose. In the case of the electronic dosemeters of direct reading conventional, the readings and dose automatic registers and the user identity to which he was assigned to each dosemeter was to carry out the restricted area exit. In activities where the ionizing radiation sources are not fully characterized, it is necessary to relocate the personal dosemeter or assigned auxiliary dosemeters (TLDs and electronics) to determine the dose received by the user to both whole body and in any specific area of it. In jobs more complicated are used a tele dosimetry system where the radiation protection technician can be monitoring the user dose to remote control, the data transmission is by radio. The dosimetry activities are documented in procedures that include dosemeter inventories realization, the equipment and dosemeters calibration, the dosimetry quality control and the discrepancies investigation between the direct reading and TLD systems. TLD dosimetry to have technical expertise in direct and indirect dosimetry and two technicians in TLD dosimetry; electronic dosimetry to have 4 calibration technicians. For the electronic dosemeters are based on a calibrator source of Cesium-137. TLD dosemeters to have an automatic radiator, an automatic reader which can read up to 100 TLD dosemeters per hour and a semiautomatic reader. To keep the equipment under a quality process was development a process of initial entry into service and carried out a periodic verification of the heating cycles. It also has a maintenance contract for the equipment directly with the manufacturer to ensure their proper functioning. The vision in perspective of the dosimetry services of Laguna Verde nuclear power plant

  3. Seismic analysis of nuclear power plant structures

    Science.gov (United States)

    Go, J. C.

    1973-01-01

    Primary structures for nuclear power plants are designed to resist expected earthquakes of the site. Two intensities are referred to as Operating Basis Earthquake and Design Basis Earthquake. These structures are required to accommodate these seismic loadings without loss of their functional integrity. Thus, no plastic yield is allowed. The application of NASTRAN in analyzing some of these seismic induced structural dynamic problems is described. NASTRAN, with some modifications, can be used to analyze most structures that are subjected to seismic loads. A brief review of the formulation of seismic-induced structural dynamics is also presented. Two typical structural problems were selected to illustrate the application of the various methods of seismic structural analysis by the NASTRAN system.

  4. Detecting Cyber Attacks On Nuclear Power Plants

    Science.gov (United States)

    Rrushi, Julian; Campbell, Roy

    This paper proposes an unconventional anomaly detection approach that provides digital instrumentation and control (I&C) systems in a nuclear power plant (NPP) with the capability to probabilistically discern between legitimate protocol frames and attack frames. The stochastic activity network (SAN) formalism is used to model the fusion of protocol activity in each digital I&C system and the operation of physical components of an NPP. SAN models are employed to analyze links between protocol frames as streams of bytes, their semantics in terms of NPP operations, control data as stored in the memory of I&C systems, the operations of I&C systems on NPP components, and NPP processes. Reward rates and impulse rewards are defined in the SAN models based on the activity-marking reward structure to estimate NPP operation profiles. These profiles are then used to probabilistically estimate the legitimacy of the semantics and payloads of protocol frames received by I&C systems.

  5. Emotional consequences of nuclear power plant disasters.

    Science.gov (United States)

    Bromet, Evelyn J

    2014-02-01

    The emotional consequences of nuclear power plant disasters include depression, anxiety, post-traumatic stress disorder, and medically unexplained somatic symptoms. These effects are often long term and associated with fears about developing cancer. Research on disasters involving radiation, particularly evidence from Chernobyl, indicates that mothers of young children and cleanup workers are the highest risk groups. The emotional consequences occur independently of the actual exposure received. In contrast, studies of children raised in the shadows of the Three Mile Island (TMI) and Chernobyl accidents suggest that although their self-rated health is less satisfactory than that of their peers, their emotional, academic, and psychosocial development is comparable. The importance of the psychological impact is underscored by its chronicity and by several studies showing that poor mental health is associated with physical health conditions, early mortality, disability, and overuse of medical services. Given the established increase in mental health problems following TMI and Chernobyl, it is likely that the same pattern will occur in residents and evacuees affected by the Fukushima meltdowns. Preliminary data from Fukushima indeed suggest that workers and mothers of young children are at risk of depression, anxiety, psychosomatic, and post-traumatic symptoms both as a direct result of their fears about radiation exposure and an indirect result of societal stigma. Thus, it is important that non-mental health providers learn to recognize and manage psychological symptoms and that medical programs be designed to reduce stigma and alleviate psychological suffering by integrating psychiatric and medical treatment within the walls of their clinics.Introduction of Emotional Consequences of Nuclear Power Plant Disasters (Video 2:15, http://links.lww.com/HP/A34).

  6. Inspection of Nuclear Power Plant Containment Structures

    Energy Technology Data Exchange (ETDEWEB)

    Graves, H.L.; Naus, D.J.; Norris, W.E.

    1998-12-01

    Safety-related nuclear power plant (NPP) structures are designed to withstand loadings from a number of low-probability external and interval events, such as earthquakes, tornadoes, and loss-of-coolant accidents. Loadings incurred during normal plant operation therefore generally are not significant enough to cause appreciable degradation. However, these structures are susceptible to aging by various processes depending on the operating environment and service conditions. The effects of these processes may accumulate within these structures over time to cause failure under design conditions, or lead to costly repair. In the late 1980s and early 1990s several occurrences of degradation of NPP structures were discovered at various facilities (e.g., corrosion of pressure boundary components, freeze- thaw damage of concrete, and larger than anticipated loss of prestressing force). Despite these degradation occurrences and a trend for an increasing rate of occurrence, in-service inspection of the safety-related structures continued to be performed in a somewhat cursory manner. Starting in 1991, the U.S. Nuclear Regulatory Commission (USNRC) published the first of several new requirements to help ensure that adequate in-service inspection of these structures is performed. Current regulatory in-service inspection requirements are reviewed and a summary of degradation experience presented. Nondestructive examination techniques commonly used to inspect the NPP steel and concrete structures to identify and quantify the amount of damage present are reviewed. Finally, areas where nondestructive evaluation techniques require development (i.e., inaccessible portions of the containment pressure boundary, and thick heavily reinforced concrete sections are discussed.

  7. Revised analyses of decommissioning for the reference boiling water reactor power station. Effects of current regulatory and other considerations on the financial assurance requirements of the decommissioning rule and on estimates of occupational radiation exposure: Main report, draft report for comment. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Smith, R.I.; Bierschbach, M.C.; Konzek, G.J. [Pacific Northwest Lab., Richland, WA (United States)] [and others

    1994-09-01

    On June 27, 1988, the U.S. Nuclear Regulatory Commission (NRC) published in the Federal Register (53 FR 24018) the final rule for the General Requirements for Decommissioning Nuclear Facilities. With the issuance of the final rule, owners and operators of licensed nuclear power plants are required to prepare, and submit to the NRC for review, decommissioning plans and cost estimates. The NRC staff is in need of updated bases documentation that will assist them in assessing the adequacy of the licensee submittals, from the viewpoint of both the planned actions, including occupational radiation exposure, and the probable costs. The purpose of this reevaluation study is to update the needed bases documentation. This report presents the results of a review and reevaluation of the PNL 1980 decommissioning study of the Washington Public Power Supply System`s Washington Nuclear Plant Two (WNP-2), including all identifiable factors and cost assumptions which contribute significantly to the total cost of decommissioning the plant for the DECON, SAFSTOR, and ENTOMB alternatives, which now include an initial 5-7 year period during which time the spent fuel is stored in the spent fuel pool prior to beginning major disassembly or extended safe storage of the plant. This report also includes consideration of the NRC requirement that decontamination and decommissioning activities leading to termination of the nuclear license be completed within 60 years of final reactor shutdown, consideration of packaging and disposal requirements for materials whose radionuclide concentrations exceed the limits for Class C low-level waste. Costs for labor, transport, and disposal activities are given in 1993 dollars. Sensitivities of the total license termination cost to the disposal costs at different low-level radioactive waste disposal sites, to different depths of contaminated concrete surface removal within the facilities, and to different transport distances are also examined.

  8. [Chernobyl nuclear power plant accident and Tokaimura criticality accident].

    Science.gov (United States)

    Takada, Jun

    2012-03-01

    It is clear from inspection of historical incidents that the scale of disasters in a nuclear power plant accident is quite low level overwhelmingly compared with a nuclear explosion in nuclear war. Two cities of Hiroshima and Nagasaki were destroyed by nuclear blast with about 20 kt TNT equivalent and then approximately 100,000 people have died respectively. On the other hand, the number of acute death is 30 in the Chernobyl nuclear reactor accident. In this chapter, we review health hazards and doses in two historical nuclear incidents of Chernobyl and Tokaimura criticality accident and then understand the feature of the radiation accident in peaceful utilization of nuclear power.

  9. Nuclear magnetic resonance imaging of water motion in plants

    NARCIS (Netherlands)

    Scheenen, T.W.J.

    2001-01-01

    This Thesis treats one of the new techniques in plant science i.e. nuclear magnetic resonance imaging (NMRi) applied to water motion in plants. It is a challenge, however, to measure this motion in intact plants quantitatively, because plants impose specific problems when studied using

  10. Nuclear magnetic resonance imaging of water motion in plants

    NARCIS (Netherlands)

    Scheenen, T.W.J.

    2001-01-01

    This Thesis treats one of the new techniques in plant science i.e. nuclear magnetic resonance imaging (NMRi) applied to water motion in plants. It is a challenge, however, to measure this motion in intact plants quantitatively, because plants impose specific problems when studied using NMRi. At high

  11. Next Generation Nuclear Plant GAP Analysis Report

    Energy Technology Data Exchange (ETDEWEB)

    Ball, Sydney J [ORNL; Burchell, Timothy D [ORNL; Corwin, William R [ORNL; Fisher, Stephen Eugene [ORNL; Forsberg, Charles W. [Massachusetts Institute of Technology (MIT); Morris, Robert Noel [ORNL; Moses, David Lewis [ORNL

    2008-12-01

    As a follow-up to the phenomena identification and ranking table (PIRT) studies conducted recently by NRC on next generation nuclear plant (NGNP) safety, a study was conducted to identify the significant 'gaps' between what is needed and what is already available to adequately assess NGNP safety characteristics. The PIRT studies focused on identifying important phenomena affecting NGNP plant behavior, while the gap study gives more attention to off-normal behavior, uncertainties, and event probabilities under both normal operation and postulated accident conditions. Hence, this process also involved incorporating more detailed evaluations of accident sequences and risk assessments. This study considers thermal-fluid and neutronic behavior under both normal and postulated accident conditions, fission product transport (FPT), high-temperature metals, and graphite behavior and their effects on safety. In addition, safety issues related to coupling process heat (hydrogen production) systems to the reactor are addressed, given the limited design information currently available. Recommendations for further study, including analytical methods development and experimental needs, are presented as appropriate in each of these areas.

  12. Technology, safety, and costs of decommissioning a reference large irradiator and reference sealed sources

    Energy Technology Data Exchange (ETDEWEB)

    Haffner, D.R.; Villelgas, A.J. [Pacific Northwest Lab., Richland, WA (United States)

    1996-01-01

    This report contains the results of a study sponsored by the US Nuclear Regulatory Commission (NRC) to examine the decommissioning of large radioactive irradiators and their respective facilities, and a broad spectrum of sealed radioactive sources and their respective devices. Conceptual decommissioning activities are identified, and the technology, safety, and costs (in early 1993 dollars) associated with decommissioning the reference large irradiator and sealed source facilities are evaluated. The study provides bases and background data for possible future NRC rulemaking regarding decommissioning, for evaluation of the reasonableness of planned decommissioning actions, and for determining if adequate funds are reserved by the licensees for decommissioning of their large irradiator or sealed source facilities. Another purpose of this study is to provide background and information to assist licensees in planning and carrying out the decommissioning of their sealed radioactive sources and respective facilities.

  13. 75 FR 13323 - James A. Fitzpatrick Nuclear Power Plant; Exemption

    Science.gov (United States)

    2010-03-19

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION James A. Fitzpatrick Nuclear Power Plant; Exemption 1.0 Background Entergy Nuclear Operations, Inc. (the licensee) is the holder of Facility Operating License No. DPR-59, which authorizes operation...

  14. 75 FR 16520 - James A. Fitzpatrick Nuclear Power Plant; Exemption

    Science.gov (United States)

    2010-04-01

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION James A. Fitzpatrick Nuclear Power Plant; Exemption 1.0 Background Entergy Nuclear Operations, Inc. (the licensee) is the holder of Facility Operating License No. DPR-59, which authorizes operation...

  15. Nuclear power plants. Site choice; Usinas nucleoeletricas. Escolha de local

    Energy Technology Data Exchange (ETDEWEB)

    Atala, Drausio Lima

    2009-07-01

    This book establishes the standards for selection and development of criteria for evaluation of new nuclear sites in Brazil. The places where the new nuclear power plants will be installed must be adequate for construction and operation of the power plants will be submitted to Brazilian environmental and nuclear legislation of the Union, states and the local governments, besides to accomplish the world good practices of this activity.

  16. Nuclear Power Plant Maintenance Optimization with Heuristic Algorithm

    OpenAIRE

    Andrija Volkanovski; Leon Cizelj

    2014-01-01

    The test and maintenance activities are conducted in the nuclear power plants in order to prevent or limit failures resulting from the ageing or deterioration. The components and systems are partially or fully unavailable during the maintenance activities. This is especially important for the safety systems and corresponding equipment because they are important contributors to the overall nuclear power plant safety. A novel method for optimization of the maintenance activities in the nuclear ...

  17. Condition assessment of concrete structures at nuclear power plants by state of the art non-destructive testing

    Directory of Open Access Journals (Sweden)

    Rydén N.

    2011-04-01

    Full Text Available The approach combining Non Destructive Examination (NDE with Finite Element Analysis (FEA methods is both workable and necessary in order to accurately determine and predict the condition of Nuclear Power Plant (NPP containment structures. This approach was introduced in the European 5th Framework Project with acronym CONMOD [1]. The current paper presents some of the work performed after the CONMOD project combining the on-site investigation at nuclear power plant (NPP stations in Sweden and Finland. Several non-destructive techniques were chosen for the investigations described in this paper. The MASW (Multi Channel Analysis of Surface Waves and Impact Echo (IE techniques have been used for evaluation of thickness and stiffness of concrete and also for location of possible defects. The above-mentioned techniques have been applied under investigations of concrete containments. Additionally reinforcement corrosion was investigated in cooling water channels by means of the Galvanostatic Pulse technique allowing determination of corrosion rate. Further, following the CONMOD concept, the coupling between the non-destructive measurements on site and finite element method is established. As the result of this coupling, the information about the status of concrete structures in nuclear power plants is obtained. In the ongoing research & development project CONSAFESYS (Concrete Containment Condition Status & Ageing Examination System the qualification and validation of investigative methods and diagnostic tools and analysis for reactor containments are further developed. One unique benefit with the CONSAFESYS project is the possibility of introducing artificial defects and anomalies into a decommissioned reactor containment structure.

  18. Development of the nuclear plant analyzer for Korean standard Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Shin Hwan; Kim, Hyeong Heon; Song, In Ho; Hong, Eon Yeong; Oh, Yeong Taek [Korea Power Engineering Company Inc., Yongin (Korea, Republic of)

    2000-12-15

    The purpose of this study is to develop an NPA for the Ulchin Nuclear Power Plant Unit 3 and 4, the first KSNP type plant. In this study, the process model simulating the overall plant systems, GUI and simulation executive which provide the functions of an engineering simulator were developed, and the NPA was completed by integrating them. The contents and the scope of this study are as follows : main feedwater system, auxiliary feedwater system, Chemical and Volume Control System(CVCS), Safety Injection System(SIS), Shutdown Cooling System(SCS), electric power supply system, Core Protection Calculator(CPC), various plant control system, development of the graphics screens for each system, real-time simulation, simulation control for the enhancement of functional capabilities, user friendly GUI, collection of the design and operating data, establishment of the NPA database, integration of the GUI and simulation control program with process model, collection of the data for the verification and validation of the developed NPA, collection of the plant test data, collection and review of the results of other computer codes, verification of the simulation accuracy by comparing the NPA results with the actual plant data, validation of the simulation capability of the NPA, comparison against available data from other analysis suing different computer codes.

  19. 75 FR 61779 - R.E. Ginna Nuclear Power Plant, LLC; R.E. Ginna Nuclear Power Plant Environmental Assessment and...

    Science.gov (United States)

    2010-10-06

    ... COMMISSION R.E. Ginna Nuclear Power Plant, LLC; R.E. Ginna Nuclear Power Plant Environmental Assessment and... Operating License No. DPR-18, issued to R.E. Ginna Nuclear Power Plant, LLC (the licensee), for operation of the R.E. Ginna Nuclear Power Plant (Ginna), located in Ontario, New York. In accordance with 10 CFR...

  20. Fukushima nuclear power plant accident was preventable

    Science.gov (United States)

    Kanoglu, Utku; Synolakis, Costas

    2015-04-01

    On 11 March 2011, the fourth largest earthquake in recorded history triggered a large tsunami, which will probably be remembered from the dramatic live pictures in a country, which is possibly the most tsunami-prepared in the world. The earthquake and tsunami caused a major nuclear power plant (NPP) accident at the Fukushima Dai-ichi, owned by Tokyo Electric Power Company (TEPCO). The accident was likely more severe than the 1979 Three Mile Island and less severe than the Chernobyl 1986 accidents. Yet, after the 26 December 2004 Indian Ocean tsunami had hit the Madras Atomic Power Station there had been renewed interest in the resilience of NPPs to tsunamis. The 11 March 2011 tsunami hit the Onagawa, Fukushima Dai-ichi, Fukushima Dai-ni, and Tokai Dai-ni NPPs, all located approximately in a 230km stretch along the east coast of Honshu. The Onagawa NPP was the closest to the source and was hit by an approximately height of 13m tsunami, of the same height as the one that hit the Fukushima Dai-ichi. Even though the Onagawa site also subsided by 1m, the tsunami did not reach to the main critical facilities. As the International Atomic Energy Agency put it, the Onagawa NPP survived the event "remarkably undamaged." At Fukushima Dai-ichi, the three reactors in operation were shut down due to strong ground shaking. The earthquake damaged all offsite electric transmission facilities. Emergency diesel generators (EDGs) provided back up power and started cooling down the reactors. However, the tsunami flooded the facilities damaging 12 of its 13 EDGs and caused a blackout. Among the consequences were hydrogen explosions that released radioactive material in the environment. It is unfortunately clear that TEPCO and Japan's principal regulator Nuclear and Industrial Safety Agency (NISA) had failed in providing a professional hazard analysis for the plant, even though their last assessment had taken place only months before the accident. The main reasons are the following. One

  1. Consideration of Task Performance for Robots Engaged in Extremely Dangerous Environment in Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Hong, Seung Mo; Han, Kee Soo; Yi, Sung Deok; Kim, Seoung Rae [Nuclear Engineering Service and Solution Co. Ltd., Daejeon (Korea, Republic of); Choi, Young [KAERI, Daejeon (Korea, Republic of)

    2015-05-15

    After Fukushima Daiichi Nuclear Accident, it is started to pay more attention to operation and accident of nuclear power plants (NPPs). For domestic nuclear industry, it was recommended to establish corresponding strategies against accidents due to extremely dangerous natural disasters. Each nuclear power plant is also preparing to establish strategies to secure nuclear safety functions by estimating the counterplans for extreme accidents. Robots are particularly being used to access the areas where those are dangerous for human beings to access or to restore the accident. Robot technologies in NPPs are emerging cutting-edge technologies that are just a start except the developed countries like USA, Japan, etc. But they are carefully considered because they have the advantages of performing tasks in extremely dangerous environment in NPPs instead of human beings. In this study, the applicability of robots will be considered in extremely dangerous environment in NPPs. Accurate judgment of the inside situation of the plant and quick actions in the extreme condition like earthquake accompanied by loss of all AC powers should be considered as major function in terms of prevention of accident spread. According to the reported stress test results of domestic NPPs, the difficult things for operators to carry out in extreme conditions can be predictable, therefore the active use of robots as accident mitigation strategies will be helpful to reduce the unnecessary spending for facility improvement. Current trend of domestic and foreign robot technology development focuses on the information search of the inside of the plant and development of preventive maintenance of NPPs. As seen actually in Fukushima Daiichi, main roles of robots place emphasis on measuring the inside radiation level accessing to the area where operator cannot access and delivering information which can support operator's decision-making and actions. Therefore, it is considered that development of

  2. Life management plants at nuclear power plants PWR; Planes de gestion de vida en centrales nucleares PWR

    Energy Technology Data Exchange (ETDEWEB)

    Esteban, G.

    2014-10-01

    Since in 2009 the CSN published the Safety Instruction IS-22 (1) which established the regulatory framework the Spanish nuclear power plants must meet in regard to Life Management, most of Spanish nuclear plants began a process of convergence of their Life Management Plants to practice 10 CFR 54 (2), which is the current standard of Spanish nuclear industry for Ageing Management, either during the design lifetime of the plant, as well as for Long-Term Operation. This article describe how Life Management Plans are being implemented in Spanish PWR NPP. (Author)

  3. Consideration of ISDC for Decommissioning Cost Estimation

    Energy Technology Data Exchange (ETDEWEB)

    Cho, W. H.; Park, S. K.; Choi, Y. D.; Kim, I. S.; Moon, J. K. [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2013-05-15

    In 2009, they decided to update the Yellow Book, and began to update it by analyzing user experiences. They found that several countries have adopted the proposed standardized cost structure for the production of cost estimates directly or for mapping national estimates onto a common structure. They also made conclusions that more detailed advice should be given on the use of the standardized structure and on the definition of cost items to avoid ambiguity. The revised cost structure, to be known as the International Structure for Decommissioning Costing (ISDC), was published in 2012. The standardized cost structure developed in the report may be used for estimating the costs of decommissioning of any type of nuclear facility. We analyzed this standardized cost structure (ISDC) and applied it to DECOMMIS which was developed by KAERI. The appropriate estimation system for domestic application was examined by comparing the estimation results. KAERI made WBS code in DECOMMIS and data obtained during decommissioning work of KRR2 and UCP. Recently the IAEA updated the decommissioning cost items and its structure by ISDC. The cost estimation items of the DECOMMIS were applied to ISDC structure. For applying, the ISDC code compared with WBS code of DECOMMIS as on text of the activity name from daily report basis. The mapping result of the ISDC items to WBS code of the DECOMMIS is much different. AS results of this study that it need the corresponding cost category which classified in accordance with the national standard price estimates.

  4. Integrated diagnostic technique for nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Gofuku, Akio [Graduate School of Natural Science and Technology, Okayama University, Okayama (Japan)

    2014-12-15

    It is very important to detect and identify small anomalies and component failures for the safe operation of complex and large-scale artifacts such as nuclear power plants. Each diagnostic technique has its own advantages and limitations. These facts inspire us not only to enhance the capability of diagnostic techniques but also to integrate the results of diagnostic subsystems in order to obtain more accurate diagnostic results. The article describes the outline of four diagnostic techniques developed for the condition monitoring of the fast breeder reactor 'Monju'. The techniques are (1) estimation technique of important state variables based on a physical model of the component, (2) a state identification technique by non-linear discrimination function applying SVM (Support Vector Machine), (3) a diagnostic technique applying WT (Wavelet Transformation) to detect changes in the characteristics of measurement signals, and (4) a state identification technique effectively using past cases. In addition, a hybrid diagnostic system in which a final diagnostic result is given by integrating the results from subsystems is introduced, where two sets of values called confidence values and trust values are used. A technique to determine the trust value is investigated under the condition that the confidence value is determined by each subsystem.

  5. Macrofouling control in nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Ekis, E.W. Jr.; Keoplin-Gall, S.M.; McCarthy, R.E.

    1991-11-01

    Macrofouling of cooling-water systems is one of the more significant and costly problems encountered in the nuclear power industry. Both marine and freshwater macroinvertebrates can be responsible for losses in plant availability because of plugged intakes and heat transfer equipment. There is a greater diversity of macrofouling organisms in marine waters than in fresh waters. Marine macrofouling organisms include barnacles, mollusks, bryozoans, and hydroids. Barnacles are crustaceans with feathery appendages, which allow them to attach to a variety of surfaces. They are a major cause of severe macrofouling because they can remain attached even after death. The major freshwater macrofouling organisms include the Asiatic Clam (Corbicula fluminea) and the newest freshwater macrofouler, the Zebra Mussel (Dreissena polymorpha). The introduction of the Zebra Mussel into the Great Lakes has created economic and ecological problems that will not easily be solved. The threat of intercontinental dispersal of the Zebra Mussel in America is serious. Research programs have been initiated around the country to develop control methods for this macrofouling problem. The various control methodologies can be classified in the following categories: biological, chemical, physical, and mechanical. Laboratory experiments were performed to evaluate the efficacy of Actibrom against mature Zebra Mussels.

  6. Seismic hazard mitigation for nuclear power plant

    Institute of Scientific and Technical Information of China (English)

    Frieder Seible

    2013-01-01

    The seismic safety of nuclear power plant(NPP) has always been a major consideration in the site selection,design,operation,and more recently recertification of existing installations.In addition to the actual NPP and all their operational and safety related support systems,the storage of spent fuel in temporary or permanent storage facilities also poses a seismic risk.This seismic risk is typically assessed with state-of-the-art modeling and analytical tools that capture everything from the ground rupture or source of the earthquake to the site specific ground shaking,taking geotechnical parameters and soil-foundation-structure-interaction (SFSI) into account to the non-linear structural response of the reactor core,the containment structure,the core cooling system and the emergency cooling system(s),to support systems,piping systems and non-structural components,and finally the performance of spent fuel storage in the probabilistically determined operational basis earthquake (OBE) or the safe shutdown earthquake (SSE) scenario.The best and most meaningful validation and verification of these advanced analytical tools is in the form of full or very large scale experimental testing,designed and conducted in direct support of model and analysis tool calibration.This paper outlines the principles under which such calibration testing should be conducted and illustrates with examples the kind of testing and parameter evaluation required.

  7. Use of neurals networks in nuclear power plant diagnostics

    Energy Technology Data Exchange (ETDEWEB)

    Uhrig, R.E. (Tennessee Univ., Knoxville, TN (USA). Dept. of Nuclear Engineering Oak Ridge National Lab., TN (USA))

    1989-01-01

    A technique using neural networks as a means of diagnosing transients or abnormal conditions in nuclear power plants is investigated and found to be feasible. The technique is based on the fact that each physical state of the plant can be represented by a unique pattern of sensor outputs or instrument readings that can be related to the condition of the plant. Neural networks are used to relate this pattern to the fault, problem, or transient condition of the plant. A demonstration of the ability of this technique to identify causes of perturbations in the steam generator of a nuclear plant is presented. 3 refs., 4 figs.

  8. Particle-accelerator decommissioning

    Energy Technology Data Exchange (ETDEWEB)

    Opelka, J.H.; Mundis, R.L.; Marmer, G.J.; Peterson, J.M.; Siskind, B.; Kikta, M.J.

    1979-12-01

    Generic considerations involved in decommissioning particle accelerators are examined. There are presently several hundred accelerators operating in the United States that can produce material containing nonnegligible residual radioactivity. Residual radioactivity after final shutdown is generally short-lived induced activity and is localized in hot spots around the beam line. The decommissioning options addressed are mothballing, entombment, dismantlement with interim storage, and dismantlement with disposal. The recycle of components or entire accelerators following dismantlement is a definite possibility and has occurred in the past. Accelerator components can be recycled either immediately at accelerator shutdown or following a period of storage, depending on the nature of induced activation. Considerations of cost, radioactive waste, and radiological health are presented for four prototypic accelerators. Prototypes considered range from small accelerators having minimal amounts of radioactive mmaterial to a very large accelerator having massive components containing nonnegligible amounts of induced activation. Archival information on past decommissionings is presented, and recommendations concerning regulations and accelerator design that will aid in the decommissioning of an accelerator are given.

  9. AN APPROACH TO CHARACTERIZING & EVALUATING ALTERNATIVES FOR THE DECOMMISSIONING OF SUB-GRADE STRUCTURES AT THE PLUTONIUM FINISHING PLANT (PFP)

    Energy Technology Data Exchange (ETDEWEB)

    HOPKINS, A.M.; KLOS, D.B.

    2007-01-25

    In 2002, the Richland Operations Office (RL) of the US Department of Energy (DOE), the US Environmental Protection Agency (EPA), and the Washington State Department of Ecology (Ecology) developed milestones for transitioning the Plutonium Finishing Plant (PFP) facility to a clean slab-on-grade configuration. These milestones required developing an engineering evaluation/cost analysis (EF/CA) for the facility's sub-grade structures and installations as part of a series of evaluations intended to provide for the transition of the facility to a clean slab-on-grade configuration. In addition to supporting decisions for interim actions, the analyses of sub-grade structures and installations performed through this EE/CA will contribute to the remedial investigation feasibility study(ies) and subsequently to the final records of decision for the relevant operable units responsible for site closure in the 200 West Area of the Hanford Site.

  10. [Risk communication in construction of new nuclear power plant].

    Science.gov (United States)

    He, Gui-Zhen; Lü, Yong-Long

    2013-03-01

    Accompanied by construction of new nuclear power plants in the coming decades in China, risk management has become increasingly politicized and contentious. Nuclear risk communication is a critical component in helping individuals prepare for, respond to, and recover from nuclear power emergencies. It was discussed that awareness of trust and public attitudes are important determinants in nuclear power risk communication and management. However, there is limited knowledge about how to best communicate with at-risk populations around nuclear power plant in China. To bridge this gap, this study presented the attitudinal data from a field survey in under-building Haiyang nuclear power plant, Shandong Province to measure public support for and opposition to the local construction of nuclear power plant. The paper discussed the structure of the communication process from a descriptive point of view, recognizing the importance of trust and understanding the information openness. The results showed that decision-making on nuclear power was dominated by a closed "iron nuclear triangle" of national governmental agencies, state-owned nuclear enterprises and scientific experts. Public participation and public access to information on nuclear constructions and assessments have been marginal and media was a key information source. As information on nuclear power and related risks is very restricted in China, Chinese citizens (51%) tend to choose the government as the most trustworthy source. More respondents took the negative attitudes toward nuclear power plant construction around home. It drew on studies about risk communication to develop some guidelines for successful risk communication. The conclusions have vast implications for how we approach risk management in the future. The findings should be of interest to state and local emergency managers, community-based organizations, public health researchers, and policy makers.

  11. Chromosome aberrations in workers of ignalina nuclear power plant

    Energy Technology Data Exchange (ETDEWEB)

    Griciene, B.; Januskeviciute, I.; Mierauskiene, J.; Slapsyte, G. [Vilnius Univ. (Lithuania)

    2006-07-01

    Full text of publication follows: The Ignalina Nuclear Power Plant (I.N.P.P.) workers and outside workers including visitors constitute the largest occupational group exposed to low doses of ionizing radiation in Lithuania. In 2004, the annual collective dose to these workers (4392 persons) was 6,83 man Sv. The maximum annual individual dose of I.N.P.P. workers was 19,16 mSv, and of outside workers was 29,41 mSv. However, according to calculations performed by the Lithuanian Radiation Protection Centre, the decommissioning of I.N.P.P. (the I.N.P.P. is to be shut down by 2009) will result in collective dose of 35 man Sv. Therefore, a special attention should be given to implementation of radiation protection programme. The importance of cytogenetic studies in the medical surveillance of radiation-exposed persons is generally acknowledged. The aim of the present study was to analyse chromosome aberration frequencies in lymphocytes of I.N.P.P. workers. The blood sampling of 27 male workers was performed in October 2004, after planned outage of I.N.P.P.. It was estimated that outages of I.N.P.P. Units contributed 84% to all annual occupational collective dose. Average cumulative dose of 18 workers was 290,7 mSv (group A), and of 9 workers - 71,7 mSv (group B). The mean annual doses averaged over the three-year-period were 15,2 mSv and 0,76 mSv, respectively. None of the exposed workers had ever exceeded the permissible dose limit. The average age of group A workers was 45,2 years, and group B 48,2 years. A questionnaire form with details on age, occupational history, smoking habit and alcohol intake, medication, history of recent illness was completed for each person at the time of blood collection. 64 non-exposed male donors approximately matched by age were used as controls (group C). Heparinized venous blood samples were taken and cultures were initiated within 24 h according to the standard procedures. At least 500 first cycle metaphases were analysed from each

  12. Roadmap and performance carried out during Ciemat site decommissioning

    Energy Technology Data Exchange (ETDEWEB)

    Quinones, Javier; Diaz Diaz, Jose Luis

    2005-01-01

    Ciemat (Research Centre for Energy, Environment and Technology) located in the heart of the Ciudad Universitaria of Madrid, occupies a property of 20 Ha. Since its creation in 1951 as JEN, and in 1986 renowned as Ciemat, it has involved on R and D projects in the field of Energy and Environment, i.e., Nuclear Fission, Nuclear Fusion, Fossils Fuels, Renewable Energy. As a consequence of the R and D projects developed between 1951 - 1986 on Nuclear Fission field (fuel design, fabrication, characterization on irradiated fuels, safety studies, etc) and to the diversification of the goals as well, it is necessary to Decommissioning and Dismantling (D and D) from nuclear facilities (nuclear reactor, Hot Cells, Irradiation facility), buildings and soils. Preparations for D and D included a staged shutdown of operations, planning documentation and licensing for decommissioning. As a prerequisite to Ciemat application for a decommissioning license and nuclear environmental assessment was carried out according to Spanish Nuclear Council (CSN) and approval of the site decommissioning project was obtained in 2000 and valid until December 31, 2006. Since 2001 - 2003 is underway and focussed on the radiological characterization of the site (divided in pieces of ground), when each piece of ground is characterized a planning for D and D is presented to CSN in order to obtain a license for actuation. Nowadays several pieces of ground are decontaminated and modifications have been done in order to achieve a safe state of storage-with-surveillance. Later phases have planned waste management improvements for selected wastes already on temporally storage, eventually followed by final decommissioning of facilities and buildings and cleaning of contaminants from soils and removal of waste from the site. This paper describes the planning, nuclear and environment assessment and descriptions of decommissioning activities currently underway at Ciemat. (Author)

  13. Monitored Natural Attenuation as a Remediation Strategy for Nuclear Power Plant Applications

    Science.gov (United States)

    Kim, K.; Bushart, S.

    2009-12-01

    plant sites. One of these remediation technologies is monitored natural attenuation (MNA), which has been widely used in other industries for the remediation of contaminants in soil and groundwater. Monitored natural attenuation (MNA) is a non-intervention, but not a no-action, groundwater and soil remediation approach that involves monitoring the dilution, dispersion, and decay of contaminants to meet remediation objectives. MNA has been commonly applied at sites where soil and groundwater have been contaminated by volatile organic compounds. This method has also been applied to remediation of radiological contamination at U.S. DOE facilities and decommissioning nuclear power plant sites. The EPRI published report (1016764) provides guidance for implementing MNA at nuclear power plants for remediation of radiological contaminants in groundwater and soil. The goal of the EPRI Groundwater Protection program is to bring together experience and technologies - both from within the nuclear industry and other industries - to support the industry’s commitment to environmental stewardship. Results from the program are being published in an extensive series of reports and software, and are being communicated to members in an annual EPRI Groundwater Protection technical exchange workshop.

  14. Next Generation Nuclear Plant Project Evaluation of Siting a HTGR Co-generation Plant on an Operating Commercial Nuclear Power Plant Site

    Energy Technology Data Exchange (ETDEWEB)

    L.E. Demick

    2011-10-01

    This paper summarizes an evaluation by the Idaho National Laboratory (INL) Next Generation Nuclear Plant (NGNP) Project of siting a High Temperature Gas-cooled Reactor (HTGR) plant on an existing nuclear plant site that is located in an area of significant industrial activity. This is a co-generation application in which the HTGR Plant will be supplying steam and electricity to one or more of the nearby industrial plants.

  15. 76 FR 32237 - Florida Power Corporation, Crystal River Unit 3 Nuclear Generating Plant; Notice of Availability...

    Science.gov (United States)

    2011-06-03

    ... COMMISSION Florida Power Corporation, Crystal River Unit 3 Nuclear Generating Plant; Notice of Availability... Plants and Public Meetings for the License Renewal of Crystal River Unit 3 Nuclear Generating Plant... operation for Crystal River Unit 3 Nuclear Generating Plant. Crystal River Unit 3 Nuclear Generating Plant...

  16. Reliability of emergency ac power systems at nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Battle, R E; Campbell, D J

    1983-07-01

    Reliability of emergency onsite ac power systems at nuclear power plants has been questioned within the Nuclear Regulatory Commission (NRC) because of the number of diesel generator failures reported by nuclear plant licensees and the reactor core damage that could result from diesel failure during an emergency. This report contains the results of a reliability analysis of the onsite ac power system, and it uses the results of a separate analysis of offsite power systems to calculate the expected frequency of station blackout. Included is a design and operating experience review. Eighteen plants representative of typical onsite ac power systems and ten generic designs were selected to be modeled by fault trees. Operating experience data were collected from the NRC files and from nuclear plant licensee responses to a questionnaire sent out for this project.

  17. Applying Functional Modeling for Accident Management of Nuclear Power Plant

    DEFF Research Database (Denmark)

    Lind, Morten; Zhang, Xinxin

    2014-01-01

    The paper investigate applications of functional modeling for accident management in complex industrial plant with special reference to nuclear power production. Main applications for information sharing among decision makers and decision support are identified. An overview of Multilevel Flow...

  18. Possible genetic damage in the Czech nuclear power plant workers

    Energy Technology Data Exchange (ETDEWEB)

    Sram, Radim J. [Laboratory of Genetic Ecotoxicology, Health Institute of Central Bohemia and Institute of Experimental Medicine AS CR, Videnska 1083, 142 20 Praha 4 (Czech Republic)]. E-mail: sram@biomed.cas.cz; Roessner, Pavel [Laboratory of Genetic Ecotoxicology, Health Institute of Central Bohemia and Institute of Experimental Medicine AS CR, Videnska 1083, 142 20 Praha 4 (Czech Republic); Rubes, Jiri [Veterinary Research Institute, Hudcova 70, 621 32 Brno (Czech Republic); Beskid, Olena [Laboratory of Genetic Ecotoxicology, Health Institute of Central Bohemia and Institute of Experimental Medicine AS CR, Videnska 1083, 142 20 Praha 4 (Czech Republic); Dusek, Zdik [Laboratory of Genetic Ecotoxicology, Health Institute of Central Bohemia and Institute of Experimental Medicine AS CR, Videnska 1083, 142 20 Praha 4 (Czech Republic); Chvatalova, Irena [Laboratory of Genetic Ecotoxicology, Health Institute of Central Bohemia and Institute of Experimental Medicine AS CR, Videnska 1083, 142 20 Praha 4 (Czech Republic); Schmuczerova, Jana [Laboratory of Genetic Ecotoxicology, Health Institute of Central Bohemia and Institute of Experimental Medicine AS CR, Videnska 1083, 142 20 Praha 4 (Czech Republic); Milcova, Alena [Laboratory of Genetic Ecotoxicology, Health Institute of Central Bohemia and Institute of Experimental Medicine AS CR, Videnska 1083, 142 20 Praha 4 (Czech Republic); Solansky, Ivo [Laboratory of Genetic Ecotoxicology, Health Institute of Central Bohemia and Institute of Experimental Medicine AS CR, Videnska 1083, 142 20 Praha 4 (Czech Republic); Bavorova, Hana [National Institute of Public Health, Srobarova 48, 100 42 Praha 10 (Czech Republic); Ocadlikova, Dana [National Institute of Public Health, Srobarova 48, 100 42 Praha 10 (Czech Republic); Kopecna, Olga [Veterinary Research Institute, Hudcova 70, 621 32 Brno (Czech Republic); Musilova, Petra [Veterinary Research Institute, Hudcova 70, 621 32 Brno (Czech Republic)

    2006-01-29

    The aim of our study was to identify occupational risk of irradiation exposure in the Czech nuclear power plant workers. We analyzed levels of chromosomal aberrations, a well-known biomarker of early biological effects and a predictor of cancer risk. We applied the conventional method of cytogenetic analysis and fluorescence in situ hybridization (FISH, whole chromosome painting for chromosomes 1 and 4, combined with a pancentromeric probe) to three groups: 123 subjects in the Temelin nuclear power plant (2 years in use), 114 subjects in the Dukovany nuclear power plant (20 years in use), and 53 matched controls from Ceske Budejovice. Nuclear power plant workers were divided into two groups: subjects with admittance into the monitored zone, and others. Following factors were also analyzed: GSTM1, GSTT1, GSTP1, XPD, XRCC1, hOGG1, p53, MTHFR, and MS gene polymorphisms, levels of vitamins A, C, E, and folate in plasma, and level of cotinine in urine. Long-term exposure to ionizing radiation in the monitored zone was 0.47 {+-} 1.50 mSv (miliSievert) in the Temelin nuclear power plant and 5.74 {+-} 9.57 mSv in the Dukovany nuclear power plant. Using the conventional cytogenetic analysis, we observed 1.90 {+-} 0.95 and 1.82 {+-} 1.19% AB.C. (percent of aberrant cells) in the Temelin nuclear power plant, and 2.39 {+-} 1.01 and 2.33 {+-} 1.04% AB.C. in the Dukovany nuclear power plant, for monitored zone workers and others, respectively. In the control group, we found 2.25 {+-} 0.82% AB.C. Genomic frequency of translocations F {sub G}/100 measured by FISH was 1.89 {+-} 1.40 and 2.01 {+-} 1.68 in the Temelin nuclear power plant, and 2.48 {+-} 1.93 and 2.14 {+-} 1.62 in the Dukovany nuclear power plant for monitored zone workers and others, respectively. In the control group, F {sub G}/100 was 1.83 {+-} 1.19. Following factors were identified as potential confounders by the conventional cytogenetic analysis: XPD-6, by the FISH: age, GSTP1 and p53Bst genotypes, long-term use

  19. Performance evaluation of fiber optic components in nuclear plant environments

    Energy Technology Data Exchange (ETDEWEB)

    Hastings, M.C.; Miller, D.W. [Ohio State Univ., Columbus, OH (United States); James, R.W. [Electric Power Research Institute, Palo Alto, CA (United States)

    1996-03-01

    Over the past several years, the Electric Power Research Institute (EPRI) has funded several projects to evaluate the performance of commercially available fiber optic cables, connective devices, light sources, and light detectors under environmental conditions representative of normal and abnormal nuclear power plant operating conditions. Future projects are planned to evaluate commercially available fiber optic sensors and to install and evaluate performance of instrument loops comprised of fiber optic components in operating nuclear power plant applications. The objective of this research is to assess the viability of fiber optic components for replacement and upgrade of nuclear power plant instrument systems. Fiber optic instrument channels offer many potential advantages: commercial availability of parts and technical support, small physical size and weight, immunity to electromagnetic interference, relatively low power requirements, and high bandwidth capabilities. As existing nuclear power plants continue to replace and upgrade I&C systems, fiber optics will offer a low-cost alternative technology which also provides additional information processing capabilities. Results to date indicate that fiber optics are a viable technology for many nuclear applications, both inside and outside of containments. This work is funded and manage& under the Operations & Maintenance Cost Control research target of EPRI`s Nuclear Power Group. The work is being performed by faculty and students in the Mechanical and Nuclear Engineering Departments and the staff of the Nuclear Reactor Laboratory of the Ohio State University.

  20. Method for assigning sites to projected generic nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Holter, G.M.; Purcell, W.L.; Shutz, M.E.; Young, J.R.

    1986-07-01

    Pacific Northwest Laboratory developed a method for forecasting potential locations and startup sequences of nuclear power plants that will be required in the future but have not yet been specifically identified by electric utilities. Use of the method results in numerical ratings for potential nuclear power plant sites located in each of the 10 federal energy regions. The rating for each potential site is obtained from numerical factors assigned to each of 5 primary siting characteristics: (1) cooling water availability, (2) site land area, (3) power transmission land area, (4) proximity to metropolitan areas, and (5) utility plans for the site. The sequence of plant startups in each federal energy region is obtained by use of the numerical ratings and the forecasts of generic nuclear power plant startups obtained from the EIA Middle Case electricity forecast. Sites are assigned to generic plants in chronological order according to startup date.

  1. Site selection for new nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Rizzo, Paul C.; Dubinsky, Melissa; Tastan, Erdem Onur, E-mail: paul.rizzo@rizzoassoc.com, E-mail: melissa.dubinsky@rizzoassoc.com, E-mail: onur.tastan@rizzoassoc.com [RIZZO Associates Inc., Pittsburgh, PA (United States); Miano, Sandra C., E-mail: scm27@psu.edu [Eletrobras Termonuclear S.A. (ELETRONUCLEAR), RJ (Brazil); Pennsylvania State University, Department of Mechanical and Nuclear Engineering, State College, PA (United States)

    2015-07-01

    The current methodology for selecting the most advantageous site(s) for nuclear power plant (NPP) development is based on the latest evolution of protocols originally established in the 1990's by the Electric Power Research Institute (EPRI) and others for programs in the USA, and more recently by the International Atomic Energy Agency (IAEA), among others. The methodology includes protocols that account for lessons learned from both the Gen III projects and the catastrophic event at Fukushima, Japan. In general, the approach requires consideration of Exclusionary or 'fatal flaw' Criteria first, based on safety as well as significant impact to the environment or human health. Sites must meet all of these Exclusionary Criteria to be considered for NPP development. Next, the remaining sites are evaluated for Avoidance Criteria that affect primarily ease of construction and operations, which allow a ranking of sites best suited for NPP development. Finally, Suitability Criteria are applied to the potential sites to better differentiate between closely ranked sites. Generally, final selection of a Preferred and an Alternate Site will require balancing of factors, expert judgment, and client input, as sites being compared will differ in their scores associated with different Avoidance Criteria and Suitability Criteria. RIZZO Associates (RIZZO) offers in this paper a modification to this methodology for selecting the site for NPP development, which accords to the categories of Exclusionary, Avoidance and Suitability Criteria strict definitions which can be considered as Absolute Factors, Critical Factors, and Economic Factors for a more focused approach to site selection. Absolute Factors include all of the safety-related Exclusionary Criteria. Critical Factors are those that are difficult to overcome unless extraordinary mitigation measures are implemented; they have a significant impact on the ability of the project to be successful and may cause the

  2. Nuclear Power Plant Maintenance Optimization with Heuristic Algorithm

    Directory of Open Access Journals (Sweden)

    Andrija Volkanovski

    2014-01-01

    Full Text Available The test and maintenance activities are conducted in the nuclear power plants in order to prevent or limit failures resulting from the ageing or deterioration. The components and systems are partially or fully unavailable during the maintenance activities. This is especially important for the safety systems and corresponding equipment because they are important contributors to the overall nuclear power plant safety. A novel method for optimization of the maintenance activities in the nuclear power plant considering the plant safety is developed and presented. The objective function of the optimization is the mean value of the selected risk measure. The risk measure is assessed from the minimal cut sets identified in the Probabilistic Safety Assessment. The optimal solution of the objective function is estimated with genetic algorithm. The proposed method is applied on probabilistic safety analysis model of the selected safety system of the reference nuclear power plant. Obtained results show that optimization of maintenance decreases the risk and thus improves the plant safety. The implications of the consideration of different constraints on the obtained results are investigated and presented. The future prospects for the optimization of the maintenance activities in the nuclear power plants with the presented method are discussed.

  3. Revised analyses of decommissioning for the reference boiling water reactor power station. Effects of current regulatory and other considerations on the financial assurance requirements of the decommissioning rule and on estimates of occupational radiation exposure - main report. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Smith, R.I.; Bierschbach, M.C.; Konzek, G.J.; McDuffie, P.N.

    1996-07-01

    The NRC staff is in need of updated bases documentation that will assist them in assessing the adequacy of the licensee submittals, from the viewpoint of both the planned actions, including occupational radiation exposure, and the probable costs. The purpose of this reevaluation study is to update the needed bases documentation. This report presents the results of a review and reevaluation of the PNL 1980 decommissioning study of the Washington Public Power Supply System`s Washington Nuclear Plant Two (WNP-2), which is a boiling water reactor (BWR), located at Richland, Washington, including all identifiable factors and cost assumptions which contribute significantly to the total cost of decommissioning the plant for the DECON, SAFSTOR, and ENTOMB decommissioning alternatives. These alternatives now include an initial 5-7 year period during which time the spent fuel is stored in the spent fuel pool prior to beginning major disassembly or extended safe storage of the plant. Included for information (but not part of the license termination cost) is an estimate of the cost to demolish the decontaminated and clean structures on the site and to restore the site to a {open_quotes}green field{close_quotes} condition. This report also includes consideration of the NRC requirement that decontamination and decommissioning activities leading to termination of the nuclear license be completed within 60 years of final reactor shutdown, consideration of packaging and disposal requirements for materials whose radionuclide concentrations exceed the limits for Class C low- level waste (i.e., Greater-Than-Class C), and reflects 1993 costs for labor, materials, transport, and disposal activities. Sensitivity of the total license termination cost to the disposal costs at different low-level radioactive waste disposal sites, to different depths of contaminated concrete surface removal within the facilities, and to different transport distances is also examined.

  4. External laundry service. A tool for fleet management and flexible decommissioning; Externer Waescheservice. Ein Werkzeug der zentralen Steuerung und der flexiblen Rueckbauplanung

    Energy Technology Data Exchange (ETDEWEB)

    Brueckner, Guenter [Unitech, Hartford, CT (United States); Schmitt, Burkhard [Unitech, Coevorden (Netherlands); Micklinghoff, Michael

    2014-07-15

    While it is common in other countries such as the USA or Sweden to send out contaminated garments to an external laundering facility, this is not the case in Germany, where the preferred tendency in the nuclear industry is to remain independent from an external service provider. After the US based company 'UniTech' built a laundering facility for controlled area garment in Coevorden, Netherlands, in 1996, German operators began testing this service for decommissioning work. At the time, their justification for this choice was based on the following: - In case of a disrupted delivery the consequences would not be as severe for a nuclear power plant in the process of decommissioning. - Additional investments (evaporators) would have been necessary to install in the laundries of the individual nuclear power plants. - The existing on-site laundries and waste treatment equipment were often not suited to deal with nuclides, specific to decommissioning. It quickly became evident that a specialized service provider could conduct the necessary tasks more effectively, more flexibly, and with higher quality than an ancillary on-site facility. In addition, it became evident that central fleet management tasks are facilitated by contracting an external service provider. Business and technical processes, and requirements agreed upon in a framework agreement, supported the introduction of unified standards. The road map for future decommissioning projects in Germany is impacted by many uncertainties. Therefore, planning requires a great deal of flexibility. Here, as with other related operations, it is critical that enough protective garments are in the right place at the right time. If this does not happen, delays, additional costs and changes to process planning result. For these reasons, an external laundering and garment management service is the most reliable solution. Industry experience shows that even very short-term requests for large quantities of protective

  5. CONSIDERATIONS FOR THE DEVELOPMENT OF A DEVICE FOR THE DECOMMISSIONING OF THE HORIZONTAL FUEL CHANNELS IN THECANDU 6 NUCLEAR REACTOR. PART 8 - PRESENTATION OF THE CUTTING AND EXTRACTING DEVICE

    Directory of Open Access Journals (Sweden)

    Constantin POPESCU

    2015-05-01

    Full Text Available This paper present a constructive solution proposed by the authors in order to achieve of a cutting and extracting device for the decommissioning of the horizontal fuel channels in the CANDU 6 nuclear reactor. One of the most important part of the decommissioning device is the Cutting and Extraction Device (CED which perform the dismantling, cutting and extraction of the fuel channel components. This flexible and modular device is designed to work inside the fuel channel. The main operations performed by the Cutting and Extraction Device (CED are dismantling and extraction of the channel closure plug and shield plug, cutting and extraction of the pressure tube. The Cutting and Extraction Device (CED consists of following modules: guiding-fixing module, traction modules, cutting module, guiding-extracting module and articulated elements for modules connecting. The guiding-fixing module is equipped with elastic guiding rollers and fixing claws in working position, the traction modules are provided with variable pitch rollers for allowing travel speed change through the fuel channel. The cutting module is positioned in the middle of the device and it is equipped with three roll knives for pressure tube cutting, having a system for cutting place video surveillance and pyrometers for cutting place monitoring temperature. The operations performed by the Cutting and Extraction Device (CED of fuel channel are as follows: unblock and extract the channel closure plug, unblock and extract the channel shield plug, block and cut the middle of the pressure tube, block and cut the end of the pressure tube, block and extract the half of pressure tube. The Cutting and Extraction Device (CED is fully automated, connected by wires to a Programmable Logic Controller (PLC and controlled from a Human Machine Interface (HMI. The design of the Cutting and Extraction Device (CED shall be achieved according to the particular features of the fuel channel components to be

  6. Role of decommissioning plan and its progress for the PUSPATI TRIGA Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Zakaria, Norasalwa, E-mail: norasalwa@nuclearmalaysia.gov.my; Mustafa, Muhammad Khairul Ariff, E-mail: norasalwa@nuclearmalaysia.gov.my; Anuar, Abul Adli, E-mail: norasalwa@nuclearmalaysia.gov.my; Idris, Hairul Nizam, E-mail: norasalwa@nuclearmalaysia.gov.my; Ba' an, Rohyiza, E-mail: norasalwa@nuclearmalaysia.gov.my [Malaysian Nuclear Agency, 43000 Kajang, Selangor (Malaysia)

    2014-02-12

    Malaysian nuclear research reactor, the PUSPATI TRIGA Reactor, reached its first criticality in 1982, and since then, it has been serving for more than 30 years for training, radioisotope production and research purposes. Realizing the age and the need for its decommissioning sometime in the future, a ground basis of assessment and an elaborative project management need to be established, covering the entire process from termination of reactor operation to the establishment of final status, documented as the Decommissioning Plan. At international level, IAEA recognizes the absence of Decommissioning Plan as one of the factors hampering progress in decommissioning of nuclear facilities in the world. Throughout the years, IAEA has taken initiatives and drawn out projects in promoting progress in decommissioning programmes, like CIDER, DACCORD and R2D2P, for which Malaysia is participating in these projects. This paper highlights the concept of Decommissioning plan and its significances to the Agency. It will also address the progress, way forward and challenges faced in developing the Decommissioning Plan for the PUSPATI TRIGA Reactor. The efforts in the establishment of this plan helps to provide continual national contribution at the international level, as well as meeting the regulatory requirement, if need be. The existing license for the operation of PUSPATI TRIGA Reactor does not impose a requirement for a decommissioning plan; however, the renewal of license may call for a decommissioning plan to be submitted for approval in future.

  7. Role of decommissioning plan and its progress for the PUSPATI TRIGA Reactor

    Science.gov (United States)

    Zakaria, Norasalwa; Mustafa, Muhammad Khairul Ariff; Anuar, Abul Adli; Idris, Hairul Nizam; Ba'an, Rohyiza

    2014-02-01

    Malaysian nuclear research reactor, the PUSPATI TRIGA Reactor, reached its first criticality in 1982, and since then, it has been serving for more than 30 years for training, radioisotope production and research purposes. Realizing the age and the need for its decommissioning sometime in the future, a ground basis of assessment and an elaborative project management need to be established, covering the entire process from termination of reactor operation to the establishment of final status, documented as the Decommissioning Plan. At international level, IAEA recognizes the absence of Decommissioning Plan as one of the factors hampering progress in decommissioning of nuclear facilities in the world. Throughout the years, IAEA has taken initiatives and drawn out projects in promoting progress in decommissioning programmes, like CIDER, DACCORD and R2D2P, for which Malaysia is participating in these projects. This paper highlights the concept of Decommissioning plan and its significances to the Agency. It will also address the progress, way forward and challenges faced in developing the Decommissioning Plan for the PUSPATI TRIGA Reactor. The efforts in the establishment of this plan helps to provide continual national contribution at the international level, as well as meeting the regulatory requirement, if need be. The existing license for the operation of PUSPATI TRIGA Reactor does not impose a requirement for a decommissioning plan; however, the renewal of license may call for a decommissioning plan to be submitted for approval in future.

  8. A study on Prediction of Radioactive Source-term from the Decommissioning of Domestic NPPs by using CRUDTRAN Code

    Energy Technology Data Exchange (ETDEWEB)

    Song, Jong Soon; Lee, Sang Heon; Cho, Hoon Jo [Department of Nuclear Engineering Chosun University, Gwangju (Korea, Republic of)

    2016-10-15

    For the study, the behavior mechanism of corrosion products in the primary system of the Kori no.1 was analyzed, and the volume of activated corrosion products in the primary system was assessed based on domestic plant data with the CRUDTRAN code used to predict the volume. It is expected that the study would be utilized in predicting radiation exposure of workers performing maintenance and repairs in high radiation areas and in selecting the process of decontaminations and decommissioning in the primary system. It is also expected that in the future it would be used as the baseline data to estimate the volume of radioactive wastes when decommissioning a nuclear plant in the future, which would be an important criterion in setting the level of radioactive wastes used to compute the quantity of radioactive wastes. The results of prediction of the radioactive nuclide inventory in the primary system performed in this study would be used as baseline data for the estimation of the volume of radioactive wastes when decommissioning NPPs in the future. It is also expected that the data would be important criteria used to classify the level of radioactive wastes to calculate the volume. In addition, it is expected that the data would be utilized in reducing radiation exposure of workers in charge of system maintenance and repairing in high radiation zones and also predicting the selection of decontaminations and decommissioning processes in the primary systems. In future researches, it is planned to conduct the source term assessment against other NPP types such as CANDU and OPR-1000, in addition to the Westinghouse type nuclear plants.

  9. Seismic isolation of nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Whittaker, Andrew S.; Kuma, Manish [Dept. of Civil, Structural and Environmental Engineering, State University of New York, Buffalo (United States)

    2014-10-15

    Seismic isolation is a viable strategy for protecting safety-related nuclear structures from the effects of moderate to severe earthquake shaking. Although seismic isolation has been deployed in nuclear structures in France and South Africa, it has not seen widespread use because of limited new build nuclear construction in the past 30 years and a lack of guidelines, codes and standards for the analysis, design and construction of isolation systems specific to nuclear structures. The funding by the United States Nuclear Regulatory Commission of a research project to the Lawrence Berkeley National Laboratory and MCEER/University at Buffalo facilitated the writing of a soon-to-be-published NUREG on seismic isolation. Funding of MCEER by the National Science Foundation led to research products that provide the technical basis for a new section in ASCE Standard 4 on the seismic isolation of safety-related nuclear facilities. The performance expectations identified in the NUREG and ASCE 4 for seismic isolation systems, and superstructures and substructures are described in the paper. Robust numerical models capable of capturing isolator behaviors under extreme loadings, which have been verified and validated following ASME protocols, and implemented in the open source code OpenSees, are introduced.

  10. Nuclear magnetic response imaging of sap flow in plants

    NARCIS (Netherlands)

    Windt, C.W.

    2007-01-01

    This thesis deals with Nuclear Magnetic Resonance (NMR) imaging of long distance transport in plants. Long distance transport in plants is an enigmatic process. The theoretical framework that describes its basic properties has been in place for almost a century, yet at the same time only little is

  11. Layout of China’s Nuclear Power Plants

    Institute of Scientific and Technical Information of China (English)

    2009-01-01

    Plants in operation Qinshan Nuclear Power Plant-total installed capacity of 2.956 gigawatts The first stage started construction in March 1985, was incorporated into grids in December 1991 and began business operation in April 1994. It has an installed capacity of 300

  12. Tecnatom support to new nuclear power plant projects

    Energy Technology Data Exchange (ETDEWEB)

    Manrique, A. B. [TECNATOM, S. A., Av. Montes de Oca 1, 28709 San Sebastian de los Reyes, Madrid (Spain)], e-mail: amanrique@tecnatom.es

    2009-10-15

    Tecnatom is a Spanish engineering company with more than 50 years of experience working for the nuclear industry all over the world. It has worked in over 30 countries in activities related to the operation and maintenance of nuclear power plants. Along this half century of history. Tecnatom has been providing its services to nuclear utilities, regulators, NPP vendors, NPP owners / operators and nuclear fuel manufacturers not only in Spain but also abroad. It started to work in the design of new nuclear power plants in the early 90 s and since then has continued collaborating with different suppliers in the design and licensing of new reactors especially in the areas of plant systems design, man-machine interface design, main control room simulators building, training, qualification of equipment and PSI/ISI engineering services. Some challenges to the reactivation of nuclear power plants construction are common worldwide, including: regulatory processes, workforce availability, construction project management, etc. Being some keys to success the following: apply qualified resources, enough resources for early planning, project leadership, organization and integration, establish a strong integrated management team. The goal of this paper is to inform regarding the capabilities of Tecnatom in the construction of new power plants. (Author)

  13. Draft principles, policy, and acceptance criteria for decommissioning of U.S. Department of Energy contaminated surplus facilities and summary of international decommissioning programs

    Energy Technology Data Exchange (ETDEWEB)

    Singh, B.K. [Argonne National Lab., IL (United States)]|[USDOE Office of Nuclear Safety Policy and Standards, Washington, DC (United States). Systems Analysis and Standards Div.; Gillette, J.; Jackson, J. [Argonne National Lab., IL (United States)

    1994-12-01

    Decommissioning activities enable the DOE to reuse all or part of a facility for future activities and reduce hazards to the general public and any future work force. The DOE Office of Environment, Health and Safety has prepared this document, which consists of decommissioning principles and acceptance criteria, in an attempt to establish a policy that is in agreement with the NRC policy. The purpose of this document is to assist individuals involved with decommissioning activities in determining their specific responsibilities as identified in Draft DOE Order 5820.DDD, ``Decommissioning of US Department of Energy Contaminated Surplus Facilities`` (Appendix A). This document is not intended to provide specific decommissioning methodology. The policies and principles of several international decommissioning programs are also summarized. These programs are from the IAEA, the NRC, and several foreign countries expecting to decommission nuclear facilities. They are included here to demonstrate the different policies that are to be followed throughout the world and to allow the reader to become familiar with the state of the art for environment, safety, and health (ES and H) aspects of nuclear decommissioning.

  14. Appliance of software engineering in development of nuclear power plant

    Energy Technology Data Exchange (ETDEWEB)

    Baek, Y. W.; Kim, H. C.; Yun, C. [Chungnam National Univ., Taejon (Korea, Republic of); Kim, B. R. [KINS, Taejon (Korea, Republic of)

    1999-10-01

    Application of computer technology in nuclear power plant is also a necessary transformation as in other industry fields. But until now, application of software technology was not wide-spread because of its potential effect to safety in nuclear field. It is an urgent theme to develop evaluation guide and regulation techniques to guarantee safety, reliability and quality assurance. To meet these changes, techniques for development and operation should be enhanced to ensure the quality of software systems. In this study, we show the difference between waterfall model and software life-cycle needed in development of nuclear power plant and propose the consistent framework needed in development of instrumentation and control system of nuclear power plant.

  15. Questions concerning the nuclear wastes; Les dechets nucleaires en questions

    Energy Technology Data Exchange (ETDEWEB)

    Daures, Pierre [ed.] [Electricite de France (EDF), 75 - Paris (France)

    1998-07-01

    At present, 75% of the electricity in France is of nuclear origin. Most of French people approve this mode of energy production and agree upon the continuation of the electronuclear sector exploitation. However, as any industry, the nuclear industry produces wastes which constitute a keen preoccupation of the public opinion. The nuclear program, even at its very inception, has provided the appropriate mastering of radioactive wastes by reducing their volume, by conditioning, reprocessing and storing, expressing continually its carefulness for population protection as well as for environment defence against the radiological effects. Pursuing its policy of transparency the EDF demonstrated openness and understanding towards questions raised by anyone. This brochure gives answers to the following 17 questions: -what the nuclear wastes are, which is their origin? - what is their amount? - are the nuclear waste dangerous? - how to treat the nuclear wastes? - are the radioactive waste storage sure? - is the nuclear waste transportation sure? - are these solutions sure? - why searches for long-lived radioactive wastes? - what is transmutation? - shall we bequeath to the next generations our nuclear wastes? - are there particular problems in nuclear power plant decommissioning? - what the wastes issued from decommissioning become? - are the costs of reprocessing and decommissioning taken into account in the price of the kWh? - were the nuclear wastes taken into account since the nuclear program inception? - who manages the nuclear wastes? - why France accepted the reprocessing of nuclear wastes produced in foreign countries? - is there an international policy for nuclear wastes?.

  16. Use of expert systems in nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Uhrig, R.E.

    1989-01-01

    The application of technologies, particularly expert systems, to the control room activities in a nuclear power plant has the potential to reduce operator error and increase plant safety, reliability, and efficiency. Furthermore, there are a large number of nonoperating activities (testing, routine maintenance, outage planning, equipment diagnostics, and fuel management) in which expert systems can increase the efficiency and effectiveness of overall plant and corporate operations. This document presents a number of potential applications of expert systems in the nuclear power field. 36 refs., 2 tabs.

  17. Ultrasonic Sensors Supervision of Petrochemical and Nuclear Plant

    OpenAIRE

    Upadhyay, Vimal; Agrawal, Krishna Kant; Chand, Mukesh; Mishra, Devesh

    2013-01-01

    Piping in the oil and nuclear plants are subject to erosion or corrosion inside pipe wall. This corrosion or erosion depends on chemical aggressively of fluids, operational conditions and pipeline materials. In many cases inspection become tough when pipes are mounted several meters above the ground for a human testing personnel. Sometimes, inspection done during shut- down of plant or removal of surrounded armatures. For in service maintenance or inspection of these plants, there is always a...

  18. Refueling outage services in Spanish Nuclear Power Plants; Servicios en recargas de centrales nucleares

    Energy Technology Data Exchange (ETDEWEB)

    Landete, J. L.; Soto, M.; Nunuez, A.

    2007-07-01

    DOMINGUIS Group, through its 75 years of business development, has positioned as the Spanish leader Group in Services for the Nuclear Energy and Petrochemical Sectors. In this article, we present the most significant services summary that, through the companies that constitute DOMINGUIS Group, we have developed in Refueling Outage in Spanish Nuclear Power Plants. (Author)

  19. Evaluation of seismic input for nuclear power plants; Evaluacion del input sismico para plantas nucleares

    Energy Technology Data Exchange (ETDEWEB)

    Saragoni, G. R.

    2012-07-01

    The accident that affected the Fukushima Daiichi nuclear power plant on March 11th 2011 was the result of the Tohoku earthquake (Japan), the fifth largest ever registered in the world. The characteristics of the event will be a subject for study by the nuclear and seismology communities for many years to come. (Author)

  20. Intelligent Component Monitoring for Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Lefteri Tsoukalas

    2010-07-30

    Reliability and economy are two major concerns for a nuclear power generation system. Next generation nuclear power reactors are being developed to be more reliable and economic. An effective and efficient surveillance system can generously contribute toward this goal. Recent progress in computer systems and computational tools has made it necessary and possible to upgrade current surveillance/monitoring strategy for better performance. For example, intelligent computing techniques can be applied to develop algorithm that help people better understand the information collected from sensors and thus reduce human error to a new low level. Incidents incurred from human error in nuclear industry are not rare and have been proven costly. The goal of this project is to develop and test an intelligent prognostics methodology for predicting aging effects impacting long-term performance of nuclear components and systems. The approach is particularly suitable for predicting the performance of nuclear reactor systems which have low failure probabilities (e.g., less than 10-6 year-). Such components and systems are often perceived as peripheral to the reactor and are left somewhat unattended. That is, even when inspected, if they are not perceived to be causing some immediate problem, they may not be paid due attention. Attention to such systems normally involves long term monitoring and possibly reasoning with multiple features and evidence, requirements that are not best suited for humans.

  1. Cyber Norms for Civilian Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Spirito, Christopher

    2016-11-01

    The international community agrees that the safe operation of civilian nuclear infrastructure is in every population’s best interest. One challenge each government must address is defining and agreeing to a set of acceptable norms of behavior in cyberspace as they relate to these facilities. The introduction of digital systems and networking technologies into these environments has led to the possibility that control and supporting computer systems are now accessible and exploitable, especially where interconnections to global information and communications technology (ICT) networks exist. The need for norms of behavior in cyberspace includes what is expected of system architects and cyber defenders as well as adversaries who should abide by rules of engagement even while conducting acts that violate national and international laws. The goal of this paper is to offer three behavioral cyber norms to improve the overall security of the ICT and Operational Technology (OT) networks and systems that underlie the operations of nuclear facilities. These norms of behavior will be specifically defined with the goals of reducing the threats associated to the theft of nuclear materials, accidental release of radiation and sabotage of nuclear processes. These norms would also include instances where an unwitting attacker or intelligence collection entity inadvertently makes their way into a nuclear facility network or system and can recognize they are in a protected zone and an approach to ensuring that these zones are not exploitable by bad actors to place their sensitive cyber effect delivery systems.

  2. Russian nuclear power plants for marine applications

    Energy Technology Data Exchange (ETDEWEB)

    Reistad, O. [Norwegian Radiation Protection Authority (Norway); Oelgaard, P.L. [Risoe National Lab. (Denmark)

    2006-04-15

    In order to establish a systematic approach for future proliferation and environmental analyses of Russia's marine nuclear reactor systems, this paper summarizes and analyzes the available open-source information on the design properties of reactor systems and nuclear fuels. The most distinctive features of Russian marine reactor development are pointed out, and similarities and differences between Russian military and civilian reactor systems and fuel are discussed. Relevant updated information on all Russian vessels using nuclear propulsion is presented in Annex I. The basic analytic division in this paper follows vessel generations first to third generation; and reactor types PWR and LMC technology. Most of the available information is related to nuclear icebreakers. This information is systematically analyzed in order to identify stages in the development of Russia's civilian naval nuclear reactors. Three different reactor models are discussed: OK-150, OK-900 and KLT-40, together with several versions of these. Concerning military reactors, it is not possible to identify characteristics for the individual reactor models, so the basic division follows vessel generations first to third generation. From the information available, however, it is possible to identify the main lines along which the design of submarines of especially the first and the second generation has been made. The conclusions contain a discussion of possible implications of the results, in addition to suggestions for further work. (au)

  3. In-Containment Signal Conditioning and Transmission via Power Lines within High Dose Rate Areas of Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Mueller, Steffen; Weigel, Robert; Koelpin, Alexander [Institute for Electronics Engineering, University of Erlangen-Nuremberg, Cauerstr. 9, 91058 Erlangen (Germany); Dennerlein, Juergen; Janke, Iryna; Weber, Johannes [AREVA GmbH, Paul-Gossen-Str. 100, 91052 Erlangen (Germany)

    2015-07-01

    Signal conditioning and transmission for sensor systems and networks within the containment of nuclear power plants (NPPs) still poses a challenge to engineers, particularly in the case of equipment upgrades for existing plants, temporary measurements, decommissioning of plants, but also for new builds. This paper presents an innovative method for efficient and cost-effective instrumentation within high dose rate areas inside the containment. A transmitter-receiver topology is proposed that allows simultaneous, unidirectional point-to-point transmission of multiple sensor signals by superimposing them on existing AC or DC power supply cables using power line communication (PLC) technology. Thereby the need for costly installation of additional cables and containment penetrations is eliminated. Based on commercial off-the-shelf (COTS) electronic parts, a radiation hard transmitter is designed to operate in harsh environment within the containment during full plant operation. Hardware modularity of the transmitter allows application specific tradeoffs between redundancy and channel bandwidth. At receiver side in non-radiated areas, signals are extracted from the power line, demodulated, and provided either in analog or digital output format. Laboratory qualification tests and field test results within a boiling water reactor (BWR) are validating the proof of concept of the proposed system. (authors)

  4. The Next Generation Nuclear Plant (NGNP) Project

    Energy Technology Data Exchange (ETDEWEB)

    F. H. Southworth; P. E. MacDonald

    2003-11-01

    The Next Generation Nuclear Power (NGNP) Project will demonstrate emissions-free nuclearassisted electricity and hydrogen production by 2015. The NGNP reactor will be a helium-cooled, graphite moderated, thermal neutron spectrum reactor with a design goal outlet temperature of 1000 C or higher. The reactor thermal power and core configuration will be designed to assure passive decay heat removal without fuel damage during hypothetical accidents. The fuel cycle will be a once-through very high burnup low-enriched uranium fuel cycle. This paper provides a description of the project to build the NGNP at the Idaho National Engineering and Environmental Laboratory (INEEL). The NGNP Project includes an overall reactor design activity and four major supporting activities: materials selection and qualification, NRC licensing and regulatory support, fuel development and qualification, and the hydrogen production plant. Each of these activities is discussed in the paper. All the reactor design and construction activities will be managed under the DOE’s project management system as outlined in DOE Order 413.3. The key elements of the overall project management system discussed in this paper include the client and project management organization relationship, critical decisions (CDs), acquisition strategy, and the project logic and timeline. The major activities associated with the materials program include development of a plan for managing the selection and qualification of all component materials required for the NGNP; identification of specific materials alternatives for each system component; evaluation of the needed testing, code work, and analysis required to qualify each identified material; preliminary selection of component materials; irradiation of needed sample materials; physical, mechanical, and chemical testing of unirradiated and irradiated materials; and documentation of final materials selections. The NGNP will be licensed by the NRC under 10 CFR 50 or 10

  5. 77 FR 3009 - Knowledge and Abilities Catalog for Nuclear Power Plant Operators: Advanced Boiling Water Reactors

    Science.gov (United States)

    2012-01-20

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Knowledge and Abilities Catalog for Nuclear Power Plant Operators: Advanced Boiling Water Reactors..., ``Knowledge and Abilities Catalog for Nuclear Power Plant Operators: Advanced Boiling Water Reactors.''...

  6. 76 FR 73720 - Knowledge and Abilities Catalog for Nuclear Power Plant Operators: Westinghouse AP1000...

    Science.gov (United States)

    2011-11-29

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Knowledge and Abilities Catalog for Nuclear Power Plant Operators: Westinghouse AP1000 Pressurized..., NUREG-2103, Revision 0, ``Knowledge and Abilities Catalog for Nuclear Power Plant...

  7. Nuclear plant operation: achieving excellence through quality

    Energy Technology Data Exchange (ETDEWEB)

    Bergstrom, L. [Barseback Nuclear Power Plant (Sweden); Bergeron, J.P. [Electricite de France (EDF), 75 - Paris (France); Coakley, W. [and others

    1992-07-01

    Nuclear power operation is characterised by a very high level of safety and availability resulting in economically competitive electricity production. This achievement must not only be maintained but must be further developed if nuclear power is to regain momentum in the light of its widely recognized environmental advantages. Therefore this meeting bring together all those, managers and technical staff, responsible for the operation of the nuclear in order to allow them to exchange views, experience and knowledge on fundamental aspects such as: management philosophy, quality assurance, human resources and international co-operation; focusing on training (incident analysis and management), human factors and experience feedback; maintenance philosophy, life extension and upgrading, organisation and administration. (A.L.B.)

  8. Design and construction of nuclear power plants

    CERN Document Server

    Schnell, Jürgen; Meiswinkel, Rüdiger; Bergmeister, Konrad; Fingerloos, Frank; Wörner, Johann-Dietrich

    2013-01-01

    Despite all the efforts being put into expanding renewable energy sources, large-scale power stations will be essential as part of a reliable energy supply strategy for a longer period. Given that they are low on CO2 emissions, many countries are moving into or expanding nuclear energy to cover their baseload supply.Building structures required for nuclear installations whose protective function means they are classified as safety-related, have to meet particular construction requirements more stringent than those involved in conventional construction. This book gives a comprehensive overv

  9. A Radiological Survey Approach to Use Prior to Decommissioning: Results from a Technology Scanning and Assessment Project Focused on the Chornobyl NPP

    Energy Technology Data Exchange (ETDEWEB)

    Milchikov, A.; Hund, G.; Davidko, M.

    1999-10-20

    The primary objectives of this project are to learn how to plan and execute the Technology Scanning and Assessment (TSA) approach by conducting a project and to be able to provide the approach as a capability to the Chernobyl Nuclear Power Plant (ChNPP) and potentially elsewhere. A secondary objective is to learn specifics about decommissioning and in particular about radiological surveying to be performed prior to decommissioning to help ChNPP decision makers. TSA is a multi-faceted capability that monitors and analyzes scientific, technical, regulatory, and business factors and trends for decision makers and company leaders. It is a management tool where information is systematically gathered, analyzed, and used in business planning and decision making. It helps managers by organizing the flow of critical information and provides managers with information they can act upon. The focus of this TSA project is on radiological surveying with the target being ChNPP's Unit 1. This reactor was stopped on November 30, 1996. At this time, Ukraine failed to have a regulatory basis to provide guidelines for nuclear site decommissioning. This situation has not changed as of today. A number of documents have been prepared to become a basis for a combined study of the ChNPP Unit 1 from the engineering and radiological perspectives. The results of such a study are expected to be used when a detailed decommissioning plan is created.

  10. DEACTIVATION AND DECOMMISSIONING PLANNING AND ANALYSIS WITH GEOGRAPHIC INFORMATION SYSTEMS

    Energy Technology Data Exchange (ETDEWEB)

    Bollinger, J; William Austin, W; Larry Koffman, L

    2007-09-17

    From the mid-1950's through the 1980's, the U.S. Department of Energy's Savannah River Site produced nuclear materials for the weapons stockpile, for medical and industrial applications, and for space exploration. Although SRS has a continuing defense-related mission, the overall site mission is now oriented toward environmental restoration and management of legacy chemical and nuclear waste. With the change in mission, SRS no longer has a need for much of the infrastructure developed to support the weapons program. This excess infrastructure, which includes over 1000 facilities, will be decommissioned and demolished over the forthcoming years. Dispositioning facilities for decommissioning and deactivation requires significant resources to determine hazards, structure type, and a rough-order-of-magnitude estimate for the decommissioning and demolition cost. Geographic information systems (GIS) technology was used to help manage the process of dispositioning infrastructure and for reporting the future status of impacted facilities.

  11. Insights into the Societal Risk of Nuclear Power Plant Accidents.

    Science.gov (United States)

    Denning, Richard; Mubayi, Vinod

    2017-01-01

    The elements of societal risk from a nuclear power plant accident are clearly illustrated by the Fukushima accident: land contamination, long-term relocation of large numbers of people, loss of productive farm area, loss of industrial production, and significant loss of electric capacity. NUREG-1150 and other studies have provided compelling evidence that the individual health risk of nuclear power plant accidents is effectively negligible relative to other comparable risks, even for people living in close proximity to a plant. The objective of this study is to compare the societal risk of nuclear power plant accidents to that of other events to which the public is exposed. We have characterized the monetized societal risk in the United States from major societally disruptive events, such as hurricanes, in the form of a complementary cumulative distribution function. These risks are compared with nuclear power plant risks, based on NUREG-1150 analyses and new MACCS code calculations to account for differences in source terms determined in the more recent SOARCA study. A candidate quantitative societal objective is discussed for potential adoption by the NRC. The results are also interpreted with regard to the acceptability of nuclear power as a major source of future energy supply.

  12. Nuclear power plant maintenance optimisation SENUF network activity

    Energy Technology Data Exchange (ETDEWEB)

    Ahlstrand, R.; Bieth, M.; Pla, P.; Rieg, C.; Trampus, P. [Inst. for Energy, EC DG Joint Research Centre, Petten (Netherlands)

    2004-07-01

    During providing scientific and technical support to TACIS and PHARE nuclear safety programs a large amount of knowledge related to Russian design reactor systems has accumulated and led to creation of a new Network concerning Nuclear Safety in Central and Eastern Europe called ''Safety of Eastern European type Nuclear Facilities'' (SENUF). SENUF contributes to bring together all stakeholders of TACIS and PHARE: beneficiaries, end users, Eastern und Western nuclear industries, and thus, to favour fruitful technical exchanges and feedback of experience. At present the main focus of SENUF is the nuclear power plant maintenance as substantial element of plant operational safety as well as life management. A Working Group has been established on plant maintenance. One of its major tasks in 2004 is to prepare a status report on advanced strategies to optimise maintenance. Optimisation projects have an interface with the plant's overall life management program. Today, almost all plants involved in SENUF network have an explicit policy to extend their service life, thus, component ageing management, modernization and refurbishment actions became much more important. A database is also under development, which intends to help sharing the available knowledge and specific equipment and tools. (orig.)

  13. US nuclear power plant operating cost and experience summaries

    Energy Technology Data Exchange (ETDEWEB)

    Kohn, W.E.; Reid, R.L.; White, V.S.

    1998-02-01

    NUREG/CR-6577, U.S. Nuclear Power Plant Operating Cost and Experience Summaries, has been prepared to provide historical operating cost and experience information on U.S. commercial nuclear power plants. Cost incurred after initial construction are characterized as annual production costs, representing fuel and plant operating and maintenance expenses, and capital expenditures related to facility additions/modifications which are included in the plant capital asset base. As discussed in the report, annual data for these two cost categories were obtained from publicly available reports and must be accepted as having different degrees of accuracy and completeness. Treatment of inconclusive and incomplete data is discussed. As an aid to understanding the fluctuations in the cost histories, operating summaries for each nuclear unit are provided. The intent of these summaries is to identify important operating events; refueling, major maintenance, and other significant outages; operating milestones; and significant licensing or enforcement actions. Information used in the summaries is condensed from annual operating reports submitted by the licensees, plant histories contained in Nuclear Power Experience, trade press articles, and the Nuclear Regulatory Commission (NRC) web site (www.nrc.gov).

  14. Talks on nuclear plant break down

    Index Scriptorium Estoniae

    2007-01-01

    Kasvavad probleemid Leedu tuumaelektrijaama projektiga. Läbirääkimistest Leedu valitsuse ja NDX Energija vahel. DnB Nord Bankas nimetas projekti liiga riskantseks ja kulukaks. Lisa: Eesti Energia board member suggests plant for Estonia

  15. Talks on nuclear plant break down

    Index Scriptorium Estoniae

    2007-01-01

    Kasvavad probleemid Leedu tuumaelektrijaama projektiga. Läbirääkimistest Leedu valitsuse ja NDX Energija vahel. DnB Nord Bankas nimetas projekti liiga riskantseks ja kulukaks. Lisa: Eesti Energia board member suggests plant for Estonia

  16. Meteorological measurements at nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-12-31

    On-site meteorological measurements are necessary for evaluating atmospheric dispersion of gaseous effluents. Radiation doses in a plant`s vicinity due to these effluents are calculated from the results of dispersion evaluations. The guide addresses the requirements for on-site meteorological measurement systems. Guide YVL 7.3 addresses atmospheric dispersion evaluations and calculation methods, Guide YVL 7.2 radiation dose calculations and Guide YVL 7.8 environmental data reporting. (5 refs.).

  17. A novel family of plant nuclear envelope-associated proteins.

    Science.gov (United States)

    Pawar, Vidya; Poulet, Axel; Détourné, Gwénaëlle; Tatout, Christophe; Vanrobays, Emmanuel; Evans, David E; Graumann, Katja

    2016-10-01

    This paper describes the characterisation of a new family of higher plant nuclear envelope-associated proteins (NEAPs) that interact with other proteins of the nuclear envelope. In the model plant Arabidopsis thaliana, the family consists of three genes expressed ubiquitously (AtNEAP1-3) and a pseudogene (AtNEAP4). NEAPs consist of extensive coiled-coil domains, followed by a nuclear localisation signal and a C-terminal predicted transmembrane domain. Domain deletion mutants confirm the presence of a functional nuclear localisation signal and transmembrane domain. AtNEAP proteins localise to the nuclear periphery as part of stable protein complexes, are able to form homo- and heteromers, and interact with the SUN domain proteins AtSUN1 and AtSUN2, involved in the linker of nucleoskeleton and cytoskeleton (LINC) complex. An A. thaliana cDNA library screen identified a putative transcription factor called AtbZIP18 as a novel interactor of AtNEAP1, which suggest a connection between NEAP and chromatin. An Atneap1 Atneap3 double-knockout mutant showed reduced root growth, and altered nuclear morphology and chromatin structure. Thus AtNEAPs are suggested as inner nuclear membrane-anchored coiled-coil proteins with roles in maintaining nuclear morphology and chromatin structure. © The Author 2016. Published by Oxford University Press on behalf of the Society for Experimental Biology. All rights reserved. For permissions, please email: journals.permissions@oup.com.

  18. 76 FR 81994 - UniStar Nuclear Energy; Combined License Application for Calvert Cliffs Nuclear Power Plant, Unit...

    Science.gov (United States)

    2011-12-29

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION UniStar Nuclear Energy; Combined License Application for Calvert Cliffs Nuclear Power Plant, Unit 3; Exemption 1.0 Background: UniStar Nuclear Energy (UNE) submitted to the U.S. Nuclear Regulatory...

  19. Decommissioning of the Salaspils Research Reactor

    Directory of Open Access Journals (Sweden)

    Abramenkovs Andris

    2011-01-01

    Full Text Available In May 1995, the Latvian government decided to shut down the Salaspils Research Reactor and to dispense with nuclear energy in the future. The reactor has been out of operation since July 1998. A conceptual study on the decommissioning of the Salaspils Research Reactor was drawn up by Noell-KRC-Energie- und Umwelttechnik GmbH in 1998-1999. On October 26th, 1999, the Latvian government decided to start the direct dismantling to “green-field” in 2001. The upgrading of the decommissioning and dismantling plan was carried out from 2003-2004, resulting in a change of the primary goal of decommissioning. Collecting and conditioning of “historical” radioactive wastes from different storages outside and inside the reactor hall became the primary goal. All radioactive materials (more than 96 tons were conditioned for disposal in concrete containers at the radioactive wastes depository “Radons” at the Baldone site. Protective and radiation measurement equipment of the personnel was upgraded significantly. All non-radioactive equipment and materials outside the reactor buildings were released for clearance and dismantled for reuse or conventional disposal. Contaminated materials from the reactor hall were collected and removed for clearance measurements on a weekly basis.

  20. Safety and effective developing nuclear power to realize green and low-carbon development

    Directory of Open Access Journals (Sweden)

    Qi-Zhen Ye

    2016-03-01

    Full Text Available This paper analyzes the role of nuclear power of China's energy structure and industry system. Comparing with other renewable energy the nuclear power chain has very low greenhouse gas emission, so it will play more important role in China's low-carbon economy. The paper also discussed the necessity of nuclear power development to achieve emission reduction, energy structure adjustment, nuclear power safety, environmental protection, enhancement of nuclear power technology, nuclear waste treatment, and disposal, as well as nuclear power plant decommissioning. Based on the safety record and situation of the existing power plants in China, the current status of the development of world nuclear power technology, and the features of the independently designed advanced power plants in China, this paper aims to demonstrate the safety of nuclear power. A nuclear power plant will not cause harm either to the environment and nor to the public according to the real data of radioactivity release, which are obtained from an operational nuclear plant. The development of nuclear power technology can enhance the safety of nuclear power. Further, this paper discusses issues related to the nuclear fuel cycle, the treatment, and disposal strategies of nuclear waste, and the decommissioning of a nuclear power plant, all of which are issues of public concern.

  1. Reliability methods in nuclear power plant ageing management

    Energy Technology Data Exchange (ETDEWEB)

    Simola, K. [VTT Automation, Espoo (Finland). Industrial Automation

    1999-07-01

    The aim of nuclear power plant ageing management is to maintain an adequate safety level throughout the lifetime of the plant. In ageing studies, the reliability of components, systems and structures is evaluated taking into account the possible time-dependent degradation. The phases of ageing analyses are generally the identification of critical components, identification and evaluation of ageing effects, and development of mitigation methods. This thesis focuses on the use of reliability methods and analyses of plant- specific operating experience in nuclear power plant ageing studies. The presented applications and method development have been related to nuclear power plants, but many of the approaches can also be applied outside the nuclear industry. The thesis consists of a summary and seven publications. The summary provides an overview of ageing management and discusses the role of reliability methods in ageing analyses. In the publications, practical applications and method development are described in more detail. The application areas at component and system level are motor-operated valves and protection automation systems, for which experience-based ageing analyses have been demonstrated. Furthermore, Bayesian ageing models for repairable components have been developed, and the management of ageing by improving maintenance practices is discussed. Recommendations for improvement of plant information management in order to facilitate ageing analyses are also given. The evaluation and mitigation of ageing effects on structural components is addressed by promoting the use of probabilistic modelling of crack growth, and developing models for evaluation of the reliability of inspection results. (orig.)

  2. Decontamination, decommissioning, and vendor advertorial issue, 2008

    Energy Technology Data Exchange (ETDEWEB)

    Agnihotri, Newal (ed.)

    2008-07-15

    The focus of the July-August issue is on Decontamination, decommissioning, and vendor advertorials. Articles and reports in this issue include: D and D technical paper summaries; The role of nuclear power in turbulent times, by Tom Chrisopher, AREVA, NP, Inc.; Enthusiastic about new technologies, by Jack Fuller, GE Hitachi Nuclear Energy; It's important to be good citizens, by Steve Rus, Black and Veatch Corporation; Creating Jobs in the U.S., by Guy E. Chardon, ALSTOM Power; and, and, An enviroment and a community champion, by Tyler Lamberts, Entergy Nuclear Operations, Inc. The Industry Innovations article is titled Best of the best TIP achievement 2008, by Edward Conaway, STP Nuclear Operating Company.

  3. The new revision of NPP Krsko decommissioning, radioactive waste and spent fuel management program: analyses and results

    Energy Technology Data Exchange (ETDEWEB)

    Zeleznik, Nadja; Kralj, Metka [ARAO, Parmova 53, 1000 Ljubljana (Slovenia); Lokner, Vladimir; Levanat, Ivica; Rapic, Andrea [APO, Savska 41, Zagreb (Croatia); Mele, Irena [IAEA, Vienna (Austria)

    2010-07-01

    The preparation of the new revision of the Decommissioning and Spent Fuel (SF) and Low and Intermediate level Waste (LILW) Disposal Program for the NPP Krsko (Program) started in September 2008 after the acceptance of the Term of Reference for the work by Intergovernmental Committee responsible for implementation of the Agreement between the governments of Slovenia and Croatia on the status and other legal issues related to investment, exploitation, and decommissioning of the Nuclear power plant Krsko. The responsible organizations, APO and ARAO together with NEK prepared all new technical and financial data and relevant inputs for the new revision in which several scenarios based on the accepted boundary conditions were investigated. The strategy of immediate dismantling was analyzed for planned and extended NPP life time together with linked radioactive waste and spent fuel management to calculate yearly annuity to be paid by the owners into the decommissioning funds in Slovenia and Croatia. The new Program incorporated among others new data on the LILW repository including the costs for siting, construction and operation of silos at the location Vrbina in Krsko municipality, the site specific Preliminary Decommissioning Plan for NPP Krsko which included besides dismantling and decontamination approaches also site specific activated and contaminated radioactive waste, and results from the referenced scenario for spent fuel disposal but at very early stage. Important inputs for calculations presented also new amounts of compensations to the local communities for different nuclear facilities which were taken from the supplemented Slovenian regulation and updated fiscal parameters (inflation, interest, discount factors) used in the financial model based on the current development in economical environment. From the obtained data the nominal and discounted costs for the whole nuclear program related to NPP Krsko which is jointly owned by Slovenia and Croatia have

  4. Regulatory practices for nuclear power plants in India

    Indian Academy of Sciences (India)

    S S Bajaj

    2013-10-01

    The Atomic Energy Regulatory Board (AERB) is the national authority for ensuring that the use of ionizing radiation and nuclear energy does not cause any undue risk to the health of workers, members of the public and to the environment. AERB is responsible for the stipulation and enforcement of rules and regulations pertaining to nuclear and radiological safety. This paper describes the regulatory process followed by AERB for ensuring the safety of nuclear power plants (NPPs) during their construction as well as operation. This regulatory process has been continuously evolving to cater to the new developments in reactor technology. Some of the recent initiatives taken by AERB in this direction are briefly described. Today, AERB faces new challenges like simultaneous review of a large number of new projects of diverse designs, a fast growing nuclear power program and functioning of operating plants in a competitive environment. This paper delineates how AERB is gearing up to meet these challenges in an effective manner.

  5. Radioactive materials released from nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Tichler, J.; Norden, K.; Congemi, J. (Brookhaven National Lab., Upton, NY (USA))

    1991-05-01

    Releases of radioactive materials in airborne and liquid effluents from commercial light water reactors during 1988 have been compiled and reported. Data on solid waste shipments as well as selected operating information have been included. This report supplements earlier annual reports issued by the former Atomic Energy Commission and the Nuclear Regulatory Commission. The 1988 release data are summarized in tabular form. Data covering specific radionuclides are summarized. 16 tabs.

  6. Human factors engineering plan for reviewing nuclear plant modernization programs

    Energy Technology Data Exchange (ETDEWEB)

    O' Hara, John; Higgins, James [Brookhaven National Laboratory, Upton, NY (United States)

    2004-12-01

    The Swedish Nuclear Power Inspectorate reviews the human factors engineering (HFE) aspects of nuclear power plants (NPPs) involved in the modernization of the plant systems and control rooms. The purpose of a HFE review is to help ensure personnel and public safety by verifying that accepted HFE practices and guidelines are incorporated into the program and nuclear power plant design. Such a review helps to ensure the HFE aspects of an NPP are developed, designed, and evaluated on the basis of a structured top-down system analysis using accepted HFE principles. The review addresses eleven HFE elements: HFE Program Management, Operating Experience Review, Functional Requirements Analysis and Allocation, Task Analysis, Staffing, Human Reliability Analysis, Human-System Interface Design, Procedure Development, Training Program Development, Human Factors Verification and Validation, and Design Implementation.

  7. Study on evaluation system for Chinese nuclear power plants

    Institute of Scientific and Technical Information of China (English)

    LI Song-bai; CHENG Jian-xiu

    2006-01-01

    This paper analyzes the meaning, structure, function and assessment methods of a nuclear power plant evaluation system, and the similarities and differences among various assessment methods. Based on this research an integrated and detailed suggestion is proposed on how to establish and improve internal and external evaluation systems for Chinese NPPs. It includes: to prepare and implement the nuclear power plant operational management program, to build an integrated performance indicator system, to improve the present audit system and conduct the comprehensive evaluation system, to set up and implement the integrated corrective action system, to position precisely the status of operation assessment of nuclear power plants, to conduct the assessment activities on constructing NPP, to initiate the specific assessment in some important areas, to establish industry performance indicator system, to improve the assessment methods, to share the assessment results, to select,cultivate and certify the reviewers, and to enhance international communication and cooperation.

  8. Radiation protection performance indicators at the Nuclear Power Plant Krsko.

    Science.gov (United States)

    Janzekovic, Helena

    2006-06-01

    Nuclear power plant safety performance indicators are developed "by nuclear operating organisations to monitor their own performance and progress, to set their own challenging goals for improvement, and to gain additional perspective on performance relative to that of other plants". In addition, performance indicators are widely used by regulatory authorities although the use is not harmonised. Two basic performance indicators related to good radiation protection practice are collective radiation exposure and volume of low-level radioactive waste. In 2000, Nuclear Power Plant Krsko, a Westinghouse pressurised water reactor with electrical output 700 MW, finished an extensive modernisation including the replacement of both steam generators. While the annual volume of low-level radioactive waste does not show a specific trend related to modernisation, the annual collective dose reached maximum, i.e. 2.60 man Sv, and dropped to 1.13 man Sv in 2001. During the replacement of the steam generators in 2000, the dose associated with this activity was 1.48 man Sv. The annual doses in 2002 and 2003 were 0.53 and 0.80 man Sv, respectively, nearing thus the goal set by the US Institute of Nuclear Power Operators, which is 0.65 man Sv. Therefore, inasmuch as collective dose as the radiation protection performance indicator are concerned, the modernisation of the Krsko nuclear power plant was a success.

  9. Report on aging of nuclear power plant reinforced concrete structures

    Energy Technology Data Exchange (ETDEWEB)

    Naus, D.J.; Oland, C.B. [Oak Ridge National Lab., TN (United States); Ellingwood, B.R. [Johns Hopkins Univ., Baltimore, MD (United States). Dept. of Civil Engineering

    1996-03-01

    The Structural Aging Program provides the US Nuclear Regulatory Commission with potential structural safety issues and acceptance criteria for use in continued service assessments of nuclear power plant safety-related concrete structures. The program was organized under four task areas: Program Management, Materials Property Data Base, Structural Component Assessment/Repair Technology, and Quantitative Methodology for Continued Service Determinations. Under these tasks, over 90 papers and reports were prepared addressing pertinent aspects associated with aging management of nuclear power plant reinforced concrete structures. Contained in this report is a summary of program results in the form of information related to longevity of nuclear power plant reinforced concrete structures, a Structural Materials Information Center presenting data and information on the time variation of concrete materials under the influence of environmental stressors and aging factors, in-service inspection and condition assessments techniques, repair materials and methods, evaluation of nuclear power plant reinforced concrete structures, and a reliability-based methodology for current and future condition assessments. Recommendations for future activities are also provided. 308 refs., 61 figs., 50 tabs.

  10. Quality Assurance in Nuclear Power Plants; La garantia de calidad en la Centrales Nucleares

    Energy Technology Data Exchange (ETDEWEB)

    Zamarron Casinello, J. M. (CC.AA. Almaraz-Trillo); Gasca Pinilla, R. (Asociacion Nuclear Asco-Vandellos II); Sala Candela, A. (IBERDROLA); Valle Pena (NUCLENOR); Ruiz Rodriguez, C. (UNION FENOSA)

    2000-07-01

    In 1970, 10CFR50 Appendix B. Quality Assurance Criteria for Nuclear Power Plants & Fuel Reprocessing Plants, was approved in USA. This is based on 18 criteria and requires American nuclear power plants to establish as quickly as possible a Quality Assurance Program (QAP) specifying how to comply with the criteria contained in this Appendix. The Ministry of Industry required that this standard be observed in Spanish plants. In The first-generation plants (Jose Cabrera, Santa Maria de Garona and Vandellos 1), which were built before this new standard was developed, the concept of Quality Assurance has only been applied to the operating phase, whereas in second-generation plants (Almaraz, Asco3 and Cofrentes) and third-generation plants (Vandellos 2 and Trillo), the concept was applied from the very beginning of the project: design phases, construction and finally plant operation. In 1979, the IAEA publihed practical code 50-C-QA as an international reference document. It contains 13 criteria that coincide with and complement those established in Appendex B of 10CFR50. As a result, the nuclear power plants in all neighboring countries will be enforcing similar Quality Assurance criteria. (Author)

  11. A dynamical systems model for nuclear power plant risk

    Science.gov (United States)

    Hess, Stephen Michael

    The recent transition to an open access generation marketplace has forced nuclear plant operators to become much more cost conscious and focused on plant performance. Coincidentally, the regulatory perspective also is in a state of transition from a command and control framework to one that is risk-informed and performance-based. Due to these structural changes in the economics and regulatory system associated with commercial nuclear power plant operation, there is an increased need for plant management to explicitly manage nuclear safety risk. Application of probabilistic risk assessment techniques to model plant hardware has provided a significant contribution to understanding the potential initiating events and equipment failures that can lead to core damage accidents. Application of the lessons learned from these analyses has supported improved plant operation and safety over the previous decade. However, this analytical approach has not been nearly as successful in addressing the impact of plant processes and management effectiveness on the risks of plant operation. Thus, the research described in this dissertation presents a different approach to address this issue. Here we propose a dynamical model that describes the interaction of important plant processes among themselves and their overall impact on nuclear safety risk. We first provide a review of the techniques that are applied in a conventional probabilistic risk assessment of commercially operating nuclear power plants and summarize the typical results obtained. The limitations of the conventional approach and the status of research previously performed to address these limitations also are presented. Next, we present the case for the application of an alternative approach using dynamical systems theory. This includes a discussion of previous applications of dynamical models to study other important socio-economic issues. Next, we review the analytical techniques that are applicable to analysis of

  12. Cable fire risk of a nuclear power plant; Ydinvoimalaitoksen kaapelipaloriski

    Energy Technology Data Exchange (ETDEWEB)

    Aulamo, H.

    1998-02-01

    The aim of the study is to carry out a comprehensive review of cable fire risk issues of nuclear power plants (NPP) taking into account latest fire and risk assessment research results. A special emphasis is put on considering the fire risk analysis of cable rooms in the framework of TVO Olkiluoto NPP probabilistic safety assessment. The assumptions made in the analysis are assessed. The literature study section considers significant fire events at nuclear power plants, the most severe of which have nearly led to a reactor core damage (Browns Ferry, Greifswald, Armenia, Belojarsk, Narora). Cable fire research results are also examined. 62 refs.

  13. Next Generation Nuclear Plant Materials Research and Development Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    G. O. Hayner; E.L. Shaber

    2004-09-01

    The U.S Department of Energy (DOE) has selected the Very High Temperature Reactor (VHTR) design for the Next Generation Nuclear Plant (NGNP) Project. The NGNP will demonstrate the use of nuclear power for electricity and hydrogen production without greenhouse gas emissions. The reactor design will be a graphite moderated, helium-cooled, prismatic or pebble-bed, thermal neutron spectrum reactor that will produce electricity and hydrogen in a state-of-the-art thermodynamically efficient manner. The NGNP will use very high burn-up, low-enriched uranium, TRISO-coated fuel and have a projected plant design service life of 60 years.

  14. Nuclear power plant alarm systems: Problems and issues

    Energy Technology Data Exchange (ETDEWEB)

    O' Hara, J.M.; Brown, W.S.

    1991-01-01

    Despite the incorporation of advanced technology into nuclear power plant alarm systems, human factors problems remain. This paper identifies to be addressed in order to allow advanced technology to be used effectively in the design of nuclear power plant alarm systems. The operator's use and processing of alarm system information will be considered. Based upon a review of alarm system research, issues related to general system design, alarm processing, display and control are discussed. It is concluded that the design of effective alarm systems depends on an understanding of the information processing capabilities and limitations of the operator. 39 refs.

  15. A methodology for evaluating ``new`` technologies in nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Korsah, K.; Clark, R.L.; Holcomb, D.E.

    1994-06-01

    As obsolescence and spare parts issues drive nuclear power plants to upgrade with new technology (such as optical fiber communication systems), the ability of the new technology to withstand stressors present where it is installed needs to be determined. In particular, new standards may be required to address qualification criteria and their application to the nuclear power plants of tomorrow. This paper discusses the failure modes and age-related degradation mechanisms of fiber optic communication systems, and suggests a methodology for identifying when accelerated aging should be performed during qualification testing.

  16. Development of nuclear power plant real-time engineering simulator

    Institute of Scientific and Technical Information of China (English)

    LIN Meng; YANG Yan-Hua; ZHANG Rong-Hua; HU Rui

    2005-01-01

    A nuclear power plant real-time engineering simulator was developed based on general-purpose thermal-hydraulic system simulation code RELAP5. It main1y consists of three parts: improved thermal-hydraulic system simulation code RELAP5, control and protection system and human-machine interface. A normal transient of CHASHMA nuclear power plant turbine step load change from 100% to 90% of full power, was simulated by the engineering simulator as an application example. This paper presents structure and main features of the engineering simulator, and application results are shown and discussed.

  17. Design data and safety features of commerical nuclear power plant

    Energy Technology Data Exchange (ETDEWEB)

    Heddleson, F.A.

    1976-06-01

    Design data, safety features, and site characteristics are summarized for 34 nuclear power units in 17 power stations in the United States. Six pages of data are presented for each plant, consisting of thermal-hydraulic and nuclear factors, containment features, emergency-core-cooling systems, site features, circulating water system data, and miscellaneous factors. An aerial perspective is also presented for each plant. This volume covers Light Water Reactors (LWRs) with dockets 50-508 through 50-549, four HTGRs--50-171, 50-267, 50-450/451, 50-463/464, the Atlantic Floating Station 50-477/478, and the Clinch River Breeder 50-537.

  18. Laser applications in nuclear power plants

    Indian Academy of Sciences (India)

    D N Sanyal

    2014-01-01

    This paper reports the state of the art of using a solid-state Nd:YAG laser for material processing applications such as cutting, welding and drilling of several components of operational nuclear reactors in radioactive environment. We have demonstrated several advantages of laserbased material processing over conventional methods, and these are discussed briefly. At NPCIL, we have used laser techniques to cut stainless steel sheets up to 14 mm thickness and stainless steel weld up to a depth of 3 mm. This remotely operable laser system has been engineered for its robustness with proper fixtures and tooling for various material processing operations on industrial scale.

  19. 75 FR 3942 - Carolina Power & Light Company Shearon Harris Nuclear Power Plant, Unit 1 Environmental...

    Science.gov (United States)

    2010-01-25

    ... COMMISSION Carolina Power & Light Company Shearon Harris Nuclear Power Plant, Unit 1 Environmental Assessment...), for operation of the Shearon Harris Nuclear Power Plant, Unit 1 (HNP), located in New Hill, North... Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Shearon Harris Nuclear......

  20. 76 FR 46856 - Qualification of Connection Assemblies for Nuclear Power Plants

    Science.gov (United States)

    2011-08-03

    ... COMMISSION Qualification of Connection Assemblies for Nuclear Power Plants AGENCY: Nuclear Regulatory... for Nuclear Power Plants.'' This guide describes a method that the NRC considers acceptable for... environmental seals in combination with cables or wires as assemblies for service in nuclear power plants....

  1. 76 FR 63541 - Design-Basis Hurricane and Hurricane Missiles for Nuclear Power Plants

    Science.gov (United States)

    2011-10-13

    ...-2010-0288] Design-Basis Hurricane and Hurricane Missiles for Nuclear Power Plants AGENCY: Nuclear... Hurricane Missiles for Nuclear Power Plants.'' This regulatory guide provides licensees and applicants with... hurricane and design-basis hurricane-generated missiles that a nuclear power plant should be designed...

  2. 78 FR 67206 - Qualification Tests for Safety-Related Actuators in Nuclear Power Plants

    Science.gov (United States)

    2013-11-08

    ... COMMISSION Qualification Tests for Safety-Related Actuators in Nuclear Power Plants AGENCY: Nuclear...-Related Actuators in Nuclear Power Plants.'' This RG is being revised to provide applicants and licensees with the most current information on testing safety-related actuators in nuclear power plants. This...

  3. 78 FR 35330 - Initial Test Programs for Water-Cooled Nuclear Power Plants

    Science.gov (United States)

    2013-06-12

    ... COMMISSION Initial Test Programs for Water-Cooled Nuclear Power Plants AGENCY: Nuclear Regulatory Commission... revision to Regulatory Guide (RG), 1.68, ``Initial Test Programs for Water-Cooled Nuclear Power Plants... Initial Test Programs (ITPs) for light water cooled nuclear power plants. ADDRESSES: Please refer...

  4. Development of decontamination, decommissioning and environmental restoration technology

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Byung Jik; Kwon, H. S.; Kim, G. N. and others

    1999-03-01

    Through the project of 'Development of decontamination, decommissioning and environmental restoration technology', the followings were studied. 1. Development of decontamination and repair technology for nuclear fuel cycle facilities 2. Development of dismantling technology 3. Development of environmental restoration technology. (author)

  5. Nuclear power plant for deep sea

    Energy Technology Data Exchange (ETDEWEB)

    Sako, Jun; Itoh, Yasuyoshi; Kobayashi, Hideo; Hashidate, Koji; Ambo, Noriaki; Ishizaka, Yuichi; Kusunoki, Tsuyoshi.

    1991-08-29

    The present invention provides a nuclear reactor utilized as an energy source for a deep-sea submarine boat and a fixed energy source at the bottom of the sea. Here to fore, electric power generation by using chemical cells or radioisotopes has been considered as such an energy source. However, since the power and the heat generation density per weight is small, it is poor in the practicality. Then, utilization of a small-sized and highly safe nuclear reactor easy to operate is desired. That is, a reactor is disposed in the lower portion of a pressure resistant shell filled with water. An electric power generator which is directly connected to a steam turbine is contained in the upper portion. The space above the reactor containing water is used as a condenser for the turbine. In the reactor having such a constitution, countermeasures for the occurrence of accidents such as pipeline rupture can be simplified and the structure is simple to improve the safety. (I.S.).

  6. HEAVY METAL PARTITIONING IN A NUCLEAR WASTE TREATMENT PLANT

    Institute of Scientific and Technical Information of China (English)

    J. Wochele; Chr. Ludwig; H.-J. Lau; W. Heep

    2006-01-01

    The fate of different trace elements and radio nuclides in the new ZWILAG nuclear waste treatment plant(Switzerland) has been modelled, in order to predict and check the transport behaviour of the volatile species and their distribution in the plant. Calculations show that for active waste from medicine, industry, research (MIR waste) only Zn and Cs have stable gaseous species at 1200℃. The investigations confirm the efficiency of the examined flue gas cleaning system.

  7. Specific contents of the SAR for a nuclear desalination plant

    Energy Technology Data Exchange (ETDEWEB)

    Doval, A.S. [Nuclear Projects Division, INVAP S.E., S.C. de Bariloche, R.N. (Argentina)]. E-mail: doval@invap.com.ar; Nestor A. Masriera, Claudio M. Mazufri [Nuclear Projects Division, INVAP S.E., S.C. de Bariloche, R.N. (Argentina)

    2004-07-01

    Although it is widely accepted that coupling a Desalination Plant (DP) to a Nuclear Power Plant (NPP) does not pose any significant additional hazard, it must clearly be considered as a major modification of the design and, therefore, requires issuing an ad hoc version of the Facility Safety Analysis Report (SAR). Documentation is already available covering general safety aspects of nuclear desalination, including standards and applicable requirements, as well as methodologies for assessing potential exposure. In this report, a specific analysis of the main features to be considered for producing the safety analysis report of a nuclear desalination plant will be presented. For the sake of clarity, it is assumed that there is an existing SAR of the NPP and only the additional information to be included in the SAR will be considered. The scope of this additional information is extremely dependent on the desalination technology and the coupling scheme. Therefore, the kind of nuclear desalination process coupling, i.e. thermal, mechanical or electrical, must be defined as a previous task. A thorough review of the main contents of the SAR is performed in order to identify the relevant points, if any, which need to be included in every chapter coping with the coupling. The SAR chapters' content and scope are considered in accordance with IAEA guidelines. As part of the safety report, possible accidental event analysis and their consequences must be included and, therefore, the deterministic analysis of an envelope case of contamination release through the DP must be assessed. The elaboration of this safety case is analysed, and the justified scope of the models needed to quantify the contamination transport mechanisms is presented. Finally, the most commonly accepted techniques and codes, used for the deterministic safety analysis of nuclear plants and effectively applicable to nuclear desalination plants, are presented by the use of the modelling tool DESNU

  8. Aging assessment of large electric motors in nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Villaran, M.; Subudhi, M. [Brookhaven National Lab., Upton, NY (United States)

    1996-03-01

    Large electric motors serve as the prime movers to drive high capacity pumps, fans, compressors, and generators in a variety of nuclear plant systems. This study examined the stressors that cause degradation and aging in large electric motors operating in various plant locations and environments. The operating history of these machines in nuclear plant service was studied by review and analysis of failure reports in the NPRDS and LER databases. This was supplemented by a review of motor designs, and their nuclear and balance of plant applications, in order to characterize the failure mechanisms that cause degradation, aging, and failure in large electric motors. A generic failure modes and effects analysis for large squirrel cage induction motors was performed to identify the degradation and aging mechanisms affecting various components of these large motors, the failure modes that result, and their effects upon the function of the motor. The effects of large motor failures upon the systems in which they are operating, and on the plant as a whole, were analyzed from failure reports in the databases. The effectiveness of the industry`s large motor maintenance programs was assessed based upon the failure reports in the databases and reviews of plant maintenance procedures and programs.

  9. Uranium Enrichment: Analysis of Decontamination and Decommissioning Scenarios

    Science.gov (United States)

    1991-11-01

    from a September 1991 report entitled Preliminary Cost Estimate Decontamination & Decommissioning of the Gaseous Diffusion Plants , prepared for DOE by...DOE) three aging uranium enrichment plants . These plants are located in Oak Ridge, Tennessee; Paducah , Kentucky; and Portsmouth, Ohio. On October 16... Diffusion Plants Assessment of Costs for Remedial Actions. This report was prepared for DOE by Martin Marietta Energy Systems, DOE’s management and

  10. Calculating Program for Decommissioning Work Productivity based on Decommissioning Activity Experience Data

    Energy Technology Data Exchange (ETDEWEB)

    Song, Chan-Ho; Park, Seung-Kook; Park, Hee-Seong; Moon, Jei-kwon [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2014-10-15

    KAERI is performing research to calculate a coefficient for decommissioning work unit productivity to calculate the estimated time decommissioning work and estimated cost based on decommissioning activity experience data for KRR-2. KAERI used to calculate the decommissioning cost and manage decommissioning activity experience data through systems such as the decommissioning information management system (DECOMMIS), Decommissioning Facility Characterization DB System (DEFACS), decommissioning work-unit productivity calculation system (DEWOCS). In particular, KAERI used to based data for calculating the decommissioning cost with the form of a code work breakdown structure (WBS) based on decommissioning activity experience data for KRR-2.. Defined WBS code used to each system for calculate decommissioning cost. In this paper, we developed a program that can calculate the decommissioning cost using the decommissioning experience of KRR-2, UCP, and other countries through the mapping of a similar target facility between NPP and KRR-2. This paper is organized as follows. Chapter 2 discusses the decommissioning work productivity calculation method, and the mapping method of the decommissioning target facility will be described in the calculating program for decommissioning work productivity. At KAERI, research on various decommissioning methodologies of domestic NPPs will be conducted in the near future. In particular, It is difficult to determine the cost of decommissioning because such as NPP facility have the number of variables, such as the material of the target facility decommissioning, size, radiographic conditions exist.

  11. 反应堆退役压力容器放射性活度估算方法%Method for Estimation of Activity in Decommissioned Nuclear Reactor Pressure Vessel

    Institute of Scientific and Technical Information of China (English)

    郭武仁; 林晓玲; 郑宁宁

    2011-01-01

    The theoretical calculation and experimental measurement methods for estimation of activity in the decommissioned nuclear reactor pressure vessel were introduced. The physical estimation model was described,and Monte Carlo compute code and 0RIGEN2 code were recommended to be employed for the calculation of the neutron flux and activity in the reactor pressure vessel. Two methods commonly used for determining the activity in the reactor pressure vessel were introduced in detail,I.e.,sampling from the reactor pressure vessel and from the irradiation tube. The neutron flux profile was established to predict the activity in the reactor pressure vessel.%介绍了反应堆退役压力容器放射性活度估算的理论计算和实验测定方法.描述了物理估算模型,推荐采用蒙特卡罗程序和ORIGEN2程序分别计算中子通量密度和放射性活度.对确定压力容器的放射性活度时经常使用的两种方法(压力容器直接取样分析和对辐照监督管取样分析)做了详细介绍.建立了推算压力容器的放射性活度中子通量密度比例曲线.

  12. 核设施退役产生的污染物料的再循环再利用%Recycle and Reuse of Radioactively Contaminated Materials from Decommissioning of Nuclear Facilities

    Institute of Scientific and Technical Information of China (English)

    王永仙; 梁宇; 安凯媛; 崔安熙; 董毅漫

    2013-01-01

    简要阐述了核设施退役过程产生的主要污染物料---金属和混凝土的再循环和再利用情况,包括染物料的产生情况、再循环再利用途径、再循环再利用可参考的标准,以及几种污染物料的再循环再利用技术,以期对我国今后核设施退役产生的污染物料的管理提供技术支持。%The paper describes briefly the information on the recycle and reuse of radioactive materials (mainly metal and concrete ) arising from the decommissioning of nuclear facilities ,including the arisings of radioac-tively contaminated materials ,the opportunities of the recycle and reuse ,the factors influencing the practice of recycle and reuse of radioactive materials ,the approaches to recycle and reuse of radioactive materials .It may provide technological support for the management of radioactive materials .

  13. The KWS training power plant Zwentendorf. Optimal conditions for practical training in the sectors of maintenance and dismantling of nuclear power plants; Das KWS-Schulungskraftwerk Zwentendorf. Die ideale Voraussetzung fuer praktische Schulungen in den Bereichen Instandhaltung und Rueckbau von kerntechnischen Anlagen

    Energy Technology Data Exchange (ETDEWEB)

    Maassen, Herbert [KRAFTWERKSSCHULE E.V., Essen (Germany). Weiterbildung Instandhaltung fuer konventionelle-/kerntechnische Anlagen und erneuerbare Energien

    2014-06-15

    In consequence of several years of interbranch staff reduction, started middle of the 1990th, at producers of power plant installation engineering, at plant service companies as well as at the operators of power plants and nuclear power plants themselves, an area-wide decline in know-how took place, which put the safe performance of maintenance activities in nuclear power plants more and more into question. The search for adequate training possibilities to cover these deficits lead to the reorganization of the nuclear power plant Zwentendorf at the year 2002, which was changed into a training facility for maintenance trainings, particularly for the sectors of reactor service, decommissioning and dismantling of nuclear power plants and other types of power plant specific training measures. For this purpose Zwentendorf was upgraded and transformed within a long-time process, and its combination may be considered as unique throughout the world. The Kraftwerksschule e.V. (KWS) owns the exclusive rights for the performance of training measures at Zwentendorf. During the last 10 years the KWS has made almost all sectors of this nuclear power plant accessible for trainings and inspections and offers a large training program. It is the aim of the training measures to ensure the operational reliability of the mechanical and installation engineering of nuclear power plants as well as fossil fired power plants in the long term through optimized maintenance planning and performance and therefore to operate the plants safely. Because of the direct practical reference to the original mechanical and installation engineering in the real atmosphere of a power plant, the nuclear power plant of Zwentendorf is highly suitable as a training centre for staff training in theory and practice. (orig.)

  14. Status of the Decommissioning Project Management Information System Development of KAERI in 2015

    Energy Technology Data Exchange (ETDEWEB)

    Jin, Hyung Gon; Park, Seungkook; Park, Heeseong; Song, Chanho [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2015-10-15

    Various information systems have been developed and used at decommissioning sites for planning a project, record keeping for a post management and cost estimation. KAERI is the only one expert group which has decommissioning experiences and KAERI is trying to develop computer code to converge all the data which has been accumulated during KRR-1 and 2 and UCP (Uranium Conversion Plant) decommission. KRR-1 and KRR-2 are TRIGA MARK type of research reactor which were constructed worldwide. Hence, there are many chance to use decommissioning experiences and data when other TRIGA MARK type of research reactors start to decommission. KAERI DPMIS stands for Decommissioning Project Management Information System, which is aiming to re-use of data effectively. As a responsible leading group of Korean decommissioning research field, KAERI has been developing DPMIS application program, which is going to be an important mile stone of decommission industry in Korea. User friendly graphical interface and lots of actual data let people well understood on decommission planning. It is expected that continuous effort and funds will be delivered to this research.

  15. The Acceptance Strategy for Nuclear Power Plant In Indonesia

    Science.gov (United States)

    Suhaemi, Tjipta; Syaukat, Achmad

    2010-06-01

    THE ACCEPTANCE STRATEGY FOR NUCLEAR POWER PLANT IN INDONESIA. Indonesia has planned to build nuclear power plants. Some feasibility studies have been conducted intensively. However, the processes of NPP introduction are still uncertain. National Energy Plan in Indonesia, which has been made by some governmental agencies, does not yet give positive impact to the government decision to construct the nuclear power plant (NPP). This paper discusses the process of NPP introduction in Indonesia, which has been colored with debate of stakeholder and has delayed decision for go-nuclear. The technology paradigm is used to promote NPP as an alternative of reliable energy resources. This paradigm should be complemented with international politic-economic point of view. The international politic-economic point of view shows that structural powers, consisting of security, production, finance, and knowledge structures, within which the NPP is introduced, have dynamic characteristics. The process of NPP introduction in Indonesia contains some infrastructure development (R&D, legislation, regulation, energy planning, site study, public acceptance efforts, etc), but they need a better coherent NPP implementation program and NPP Acceptance Program. Strategic patterns for NPP acceptance described in this paper are made by considering nuclear regulation development and the interest of basic domestic participation. The first NPP program in Indonesia having proven technology and basic domestic participation is and important milestone toward and optimal national energy-mix.

  16. Monitoring thermal discharge from a nuclear plant through Landsat 8

    Science.gov (United States)

    Wang, Difeng; Pan, Delu; Wei, Ji-An; Gong, Fang; Zhu, Qiankun; Chen, Peng

    2016-10-01

    The National Development and Reform Commission of China has approved a large number of nuclear power projects, with a total capacity of 23,000 MW. However, concomitant with the accelerated development of nuclear power stations, the environmental effects of thermal discharge will become a problem that cannot be avoided. Real-time monitoring of water temperature needs to be installed following station construction in order to measure its variation with time and to ensure that the operation of the nuclear plant does not result in adverse environmental damage. Landsat is the world's oldest, continuously acquired collection of space-based, moderate-resolution, land remote sensing data. On May 30, 2013, data from the Landsat 8 satellite became available, and the data quality and radiometric quantization of the thermal infrared sensor (TIRS) are significantly greater than those of previous Landsat instruments. The analysis of sea surface temperature (SST) obtained from Landsat 8's TIRS data was used to enhance information about the plume shape, dimensions, and direction of dispersion of the thermal discharge from the Qinshan Nuclear Power Plant in Hangzhou Bay on the East China Sea coast. Both single-channel and split-window algorithms were used and focused. The detection of temperature increases through split-window algorithms is considered a preferable method for warm discharge monitoring. Recent results showed that the thermal discharge from the nuclear plant was controlled over a small area, and that it never breached national water quality standards.

  17. Ground acceleration in a nuclear power plant; Aceleracion del suelo en una central nuclear

    Energy Technology Data Exchange (ETDEWEB)

    Pena G, P.; Balcazar, M.; Vega R, E., E-mail: pablo.pena@inin.gob.mx [ININ, Carretera Mexico-Toluca s/n, 52750 Ocoyoacac, Estado de Mexico (Mexico)

    2015-09-15

    A methodology that adopts the recommendations of international organizations for determining the ground acceleration at a nuclear power plant is outlined. Systematic presented here emphasizes the type of geological, geophysical and geotechnical studies in different areas of influence, culminating in assessments of Design Basis earthquake and the earthquake Operating Base. The methodology indicates that in regional areas where the site of the nuclear power plant is located, failures are identified in geological structures, and seismic histories of the region are documented. In the area of detail geophysical tools to generate effects to determine subsurface propagation velocities and spectra of the induced seismic waves are used. The mechanical analysis of drill cores allows estimating the efforts that generate and earthquake postulate. Studies show that the magnitude of the Fukushima earthquake, did not affect the integrity of nuclear power plants due to the rocky settlement found. (Author)

  18. Occupational dose reduction at nuclear power plants: Annotated bibliography of selected readings in radiation protection and ALARA. Volume 7

    Energy Technology Data Exchange (ETDEWEB)

    Kaurin, D.G.; Khan, T.A.; Sullivan, S.G.; Baum, J.W. [Brookhaven National Lab., Upton, NY (United States)

    1993-07-01

    The ALARA Center at Brookhaven National Laboratory publishes a series of bibliographies of selected readings in radiation protection and ALARA in the continuing effort to collect and disseminate information on radiation dose reduction at nuclear power plants. This is volume 7 of the series. The abstracts in this bibliography were selected from proceedings of technical meetings and conferences, journals, research reports, and searches of the Energy Science and Technology database of the US Department of Energy. The subject material of these abstracts relates to radiation protection and dose reduction, and ranges from use of robotics to operational health physics, to water chemistry. Material on the design, planning, and management of nuclear power stations is included, as well as information on decommissioning and safe storage efforts. Volume 7 contains 293 abstract, an author index, and a subject index. The author index is specific for this volume. The subject index is cumulative and lists all abstract numbers from volumes 1 to 7. The numbers in boldface indicate the abstracts in this volume; the numbers not in boldface represent abstracts in previous volumes.

  19. Occupational dose reduction at nuclear power plants: Annotated bibliography of selected readings in radiation protection and ALARA. Volume 8

    Energy Technology Data Exchange (ETDEWEB)

    Sullivan, S.G.; Khan, T.A.; Xie, J.W. [Brookhaven National Lab., Upton, NY (United States)

    1995-05-01

    The ALARA Center at Brookhaven National Laboratory publishes a series of bibliographies of selected readings in radiation protection and ALARA in a continuing effort to collect and disseminate information on radiation dose reduction at nuclear power plants. This volume 8 of the series. The abstracts in this bibliography were selected form proceedings of technical meetings and conference journals, research reports, and searches of the Energy Science and Technology database of the US Department of Energy. The subject material of these abstracts relates to the many aspects of radiation protection and dose reduction, and ranges form use of robotics, to operational health physics, to water chemistry. Material on the design, planning, and management of nuclear power stations is included, as well as information on decommissioning and safe storage efforts. Volume 8 contains 232 abstracts, an author index, and a subject index. The author index is specific for this volume. The subject index is cumulative and lists all abstract numbers from volumes 1 to 8. The numbers in boldface indicate the abstracts in this volume; the numbers not in boldface represent abstracts in previous volumes.

  20. Elecnuc. Nuclear power plants in the world; Elecnuc. Les centrales nucleaires dans le monde

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-07-01

    This 2003 version of Elecnuc contents information, data and charts on the nuclear power plants in the world and general information on the national perspectives concerning the electric power industry. The following topics are presented: 2002 highlights; characteristics of main reactor types and on order; map of the French nuclear power plants; the worldwide status of nuclear power plants on 2002/12/3; units distributed by countries; nuclear power plants connected to the Grid by reactor type groups; nuclear power plants under construction; capacity of the nuclear power plants on the grid; first electric generations supplied by a nuclear unit; electrical generation from nuclear plants by country at the end 2002; performance indicator of french PWR units; trends of the generation indicator worldwide from 1960 to 2002; 2002 cumulative Load Factor by owners; nuclear power plants connected to the grid by countries; status of license renewal applications in Usa; nuclear power plants under construction; Shutdown nuclear power plants; exported nuclear power plants by type; exported nuclear power plants by countries; nuclear power plants under construction or order; steam generator replacements; recycling of Plutonium in LWR; projects of MOX fuel use in reactors; electricity needs of Germany, Belgium, Spain, Finland, United Kingdom; electricity indicators of the five countries. (A.L.B.)

  1. Nuclear pre-mRNA processing in plants

    Energy Technology Data Exchange (ETDEWEB)

    Reddy, A.S.N. [Colorado State Univ., Fort Collins, CO (United States). Dept. of Biology and Program in Molecular Plant Biology; Golovkin, M. (eds.) [Thomas Jefferson Univ., Philadelphia, PA (United States). Dept. of Microbiology

    2008-07-01

    This volume of CTMI, entitled Nuclear premRNA Processing in Plants, with 16 chapters from leading scientists in this area, summarizes recent advances in nuclear pre-mRNA processing and its role in plant growth and development. It provides researchers in the field, as well as those in related areas, with an up-to-date and comprehensive, yet concise, overview of the current status and future potential of this research in understanding plant biology. The first four chapters focus on spliceosome composition, genome-wide alternative splicing, and splice site requirements for U1 and U12 introns using computational and empirical approaches. Analysis of sequenced plant genomes has revealed that 80% of all protein-coding nuclear genes contain one or more introns. The lack of an in vitro plant splicing system has made it difficult to identify general and plant-specific components of splicing machinery in plants. The next three chapters focus on serine/arginine-rich (SR) proteins, a family of highly conserved proteins, which are known to play key roles in constitutive and regulated splicing of pre-mRNA and other aspects of RNA metabolism in metazoans. These proteins engage both in RNA binding and protein.protein interactions and function as splicing regulators at multiple stages of spliceosome assembly. This family of proteins has expanded considerably in plants with several plant-specific SR proteins. Several serendipitous discoveries made using forward genetics are indicating that RNA metabolism (alternative splicing, alternative polyadenylation, mRNA transport) plays an important role in many aspects of plant growth and development and in plant responses to biotic and abiotic stresses. The next seven chapters focus on these aspects of RNA metabolism. The plant hormone abscisic acid (ABA) regulates a number of physiological processes during plant growth and development. The next chapter or A.B. Rose discusses the ways introns affect gene expression both positively and

  2. Investment decisions under uncertainties: a case of nuclear power plants

    NARCIS (Netherlands)

    Jain, S.

    2014-01-01

    This thesis discusses the role of flexibility of decisions when investing in projects that are affected by economic uncertainties. It uses the theory of real options to value such investment decisions. The thesis focuses on investment decisions related to nuclear power plants, which usually are aff

  3. Evaluation and assessment of nuclear power plant seismic methodology

    Energy Technology Data Exchange (ETDEWEB)

    Bernreuter, D.; Tokarz, F.; Wight, L.; Smith, P.; Wells, J.; Barlow, R.

    1977-03-01

    The major emphasis of this study is to develop a methodology that can be used to assess the current methods used for assuring the seismic safety of nuclear power plants. The proposed methodology makes use of system-analysis techniques and Monte Carlo schemes. Also, in this study, we evaluate previous assessments of the current seismic-design methodology.

  4. New Generation Nuclear Plant -- High Level Functions and Requirements

    Energy Technology Data Exchange (ETDEWEB)

    J. M. Ryskamp; E. J. Gorski; E. A. Harvego; S. T. Khericha; G. A. Beitel

    2003-09-01

    This functions and requirements (F&R) document was prepared for the Next Generation Nuclear Plant (NGNP) Project. The highest-level functions and requirements for the NGNP preconceptual design are identified in this document, which establishes performance definitions for what the NGNP will achieve. NGNP designs will be developed based on these requirements by commercial vendor(s).

  5. Is natural background or radiation from nuclear power plants leukemogenic

    Energy Technology Data Exchange (ETDEWEB)

    Cronkite, E.P.

    1989-01-01

    The objective in this review is to provide some facts about normal hemopoietic cell proliferation relevant to leukemogenesis, physical, chemical, and biological facts about radiation effects with the hope that each person will be able to decide for themselves whether background radiation or emissions from nuclear power plants and facilities significantly add to the spontaneous leukemia incidence. 23 refs., 1 tab.

  6. Radioactive Effluents from Nuclear Power Pl