WorldWideScience

Sample records for nuclear events contingency

  1. 75 FR 64717 - Convention on Supplementary Compensation for Nuclear Damage Contingent Cost Allocation

    Science.gov (United States)

    2010-10-20

    ... DEPARTMENT OF ENERGY Convention on Supplementary Compensation for Nuclear Damage Contingent Cost... Supplementary Compensation for Nuclear Damage (``CSC'') including its obligation to contribute to an international supplementary fund in the event of certain nuclear incidents. The NOI provided a September 27...

  2. Licensee safeguards contingency plans

    International Nuclear Information System (INIS)

    Anon.

    1978-01-01

    The Nuclear Regulatory Commission is amending its regulations to require that licensees authorized to operate a nuclear reactor (other than certain research and test reactors), and those authorized to possess strategic quantities of plutonium, uranium-233, or uranium-235 develop and implement acceptable plans for responding to threats, thefts, and industrial sabotage of licensed nuclear materials and facilities. The plans will provide a structured, orderly, and timely response to safeguards contingencies and will be an important segment of NRC's contingency planning programs. Licensee safeguards contingency plans will result in organizing licensee's safeguards resources in such a way that, in the unlikely event of a safeguards contingency, the responding participants will be identified, their several responsibilities specified, and their responses coordinated

  3. Public education programme for nuclear contingency planning in Hong Kong

    International Nuclear Information System (INIS)

    Wong, M. C.; Li, S. W.

    2002-01-01

    Two nuclear power stations on the coast of southern China are situated some 50 kilometers to the northeast of Hong Kong. Although the stations are far away from Hong Kong, the construction and operation of the nuclear power stations have generated public anxiety locally, in particular, after the Chernobyl accident in 1986. A comprehensive contingency plan which takes into account such concerns of the public has been implemented in Hong Kong. Cooperation by the public is vital to the effective implementation of any contingency plan. Understanding of the basics of radiation protection as well as the contingency plan will help the public to appreciate the situation and react in a rational manner. A public education program to promote awareness of the contingency plan has been implemented in Hong Kong. In particular, a Virtual Exhibition Hall on radiation has been developed and launched in February 2002 for access by the public via Internet. A video and a set of web pages will be launched in the later part of 2002 to inform and educate the public on matters related to nuclear accident response in Hong Kong. This paper describes the public education programme in Hong Kong to promote public awareness and understanding of the nuclear contingency plan

  4. Contingency planning for nuclear emergencies in Hong Kong

    International Nuclear Information System (INIS)

    Wong, M. C.

    2002-01-01

    Two nuclear power stations on the coast of southern China are situated some 50 kilometers to the northeast of Hong Kong. Although the stations are far away from Hong Kong, the construction and operation of the nuclear power stations have generated public anxiety locally, in particular, after the Chernobyl accident in 1986. A comprehensive contingency plan which takes into account such concerns of the public has been implemented in Hong Kong. This plan not only aims to ensure a quick and timely response to mitigate the health impact of any accidental release but also targets to re-assure the public that the territory is not contaminated when appropriate. This paper describes the principal elements of the nuclear contingency plan in Hong Kong, namely, an extensive environmental radiation monitoring programme and a proactive public communication programme

  5. Contingency Analysis of Cascading Line Outage Events

    Energy Technology Data Exchange (ETDEWEB)

    Thomas L Baldwin; Magdy S Tawfik; Miles McQueen

    2011-03-01

    As the US power systems continue to increase in size and complexity, including the growth of smart grids, larger blackouts due to cascading outages become more likely. Grid congestion is often associated with a cascading collapse leading to a major blackout. Such a collapse is characterized by a self-sustaining sequence of line outages followed by a topology breakup of the network. This paper addresses the implementation and testing of a process for N-k contingency analysis and sequential cascading outage simulation in order to identify potential cascading modes. A modeling approach described in this paper offers a unique capability to identify initiating events that may lead to cascading outages. It predicts the development of cascading events by identifying and visualizing potential cascading tiers. The proposed approach was implemented using a 328-bus simplified SERC power system network. The results of the study indicate that initiating events and possible cascading chains may be identified, ranked and visualized. This approach may be used to improve the reliability of a transmission grid and reduce its vulnerability to cascading outages.

  6. Counterfactual reasoning for regretted situations involving controllable versus uncontrollable events: the modulating role of contingent self-esteem.

    Science.gov (United States)

    Wilkinson, Meredith R; Ball, Linden J; Alford, David

    2015-01-01

    We report a study that examined the modulating impact of contingent self-esteem on regret intensity for regretted outcomes associated with controllable versus uncontrollable events. The Contingent Self-Esteem Scale (e.g., Kernis & Goldman, 2006) was used to assess the extent to which a person's sense of self-worth is based on self and others' expectations. We found that there was an influence of self-esteem contingency for controllable but not for uncontrollable regret types. For controllable regret types individuals with a high contingent (i.e., unstable) self-esteem reported greater regret intensity than those with a low contingent (i.e., stable) self-esteem. We interpret this finding as reflecting a functional and adaptive role of high contingent self-esteem in terms of mobilizing the application of counterfactual reasoning and planning mechanisms that can enable personal expectations to be achieved in the future.

  7. Counterfactual Reasoning for Regretted Situations Involving Controllable Versus Uncontrollable Events: The Modulating Role of Contingent Self-Esteem

    Science.gov (United States)

    Wilkinson, Meredith R.; Ball, Linden J.; Alford, David

    2015-01-01

    We report a study that examined the modulating impact of contingent self-esteem on regret intensity for regretted outcomes associated with controllable versus uncontrollable events. The Contingent Self-Esteem Scale (e.g., Kernis & Goldman, 2006) was used to assess the extent to which a person’s sense of self-worth is based on self and others’ expectations. We found that there was an influence of self-esteem contingency for controllable but not for uncontrollable regret types. For controllable regret types individuals with a high contingent (i.e., unstable) self-esteem reported greater regret intensity than those with a low contingent (i.e., stable) self-esteem. We interpret this finding as reflecting a functional and adaptive role of high contingent self-esteem in terms of mobilizing the application of counterfactual reasoning and planning mechanisms that can enable personal expectations to be achieved in the future. PMID:25883697

  8. Contingency planning in southern Africa: Events rather than processes?

    Directory of Open Access Journals (Sweden)

    Elias Mabaso

    2013-09-01

    Full Text Available With the increasing frequency, magnitude and impact of disasters, there is growing focus on contingency planning as a tool for enhancing resilience. Yet, there is little empirical evidence that reflects on the practice of contingency planning systems within the context of disaster risk reduction. This article explores the practice of contingency planning in southern Africa, focussing on Malawi, Mozambique, Namibia, Zambia and Zimbabwe. A qualitative comparative analysis informed by fieldwork was used. The findings show that (1 there was a wide gap between theory and practice in contingency planning, (2 response activities rarely reflected projected scenarios and (3 resources were inadequate for effective contingency planning. We conclude that unless these issues are addressed, contingency planning is likely to remain a theoretical rather than a practical tool for building disaster-resilient communities in southern African countries. Although a generalisation cannot be made on the status of contingency planning and practice in southern Africa without a wider analysis of more examples, the findings may apply beyond the examined contexts and also offer insights into research gaps.

  9. The Chalk River Nuclear Laboratories contingency plan -a brief description

    International Nuclear Information System (INIS)

    White, J.M.

    1982-01-01

    A brief description of the contingency plan which deals with both the on-site and off-site consequences of a serious nuclear accident is given. The off-site consequences of different size releases and the subsequent action taken by employees, radiation protection experts, municipal, Provincial and Federal authorities is described and the interaction of the various groups is discussed. (author)

  10. Nuclear Security Systems and Measures for Major Public Events. Implementing Guide

    International Nuclear Information System (INIS)

    2012-01-01

    Terrorism remains a threat to international stability and security. High profile international and national major public events occur regularly, capturing great public interest and receiving intense media coverage. It is widely acknowledged that there is a substantial threat of a terrorist attack on major public events such as high profile political or economic summit meetings or major sporting contests. The threat of nuclear and radiological terrorism remains on the international security agenda. Nevertheless, to reduce this risk, the international community has made great progress in securing nuclear and other radioactive material that could otherwise be used in a terrorist act. This progress is contingent on the efforts of all States to adopt strong nuclear security systems and measures. There are large quantities of diverse radioactive material in existence, which are used in areas such as health, the environment, agriculture and industry. The hazards of this material vary according to composition and intensity. Additionally, the use of explosives in combination with this material can drastically enhance the impact of a criminal or terrorist act. If a criminal or terrorist group managed to detonate a so-called 'dirty' bomb in an urban area, the result could be mass panic, widespread radioactive contamination and major economic and social disruption. Major public events are seldom held in the same State or at the same location or even at the same venue. At the national level, the hosting of major public events with proper nuclear security arrangements can provide a foundation on which to build an enduring national framework for nuclear security; one that can exist long after the event. The organization of a major public event in which large numbers of people congregate presents complex security challenges for the State hosting such an event. Criminal or terrorist acts involving nuclear or other radioactive material at any major public event could result in

  11. Contingency planning in southern Africa: Events rather than processes?

    OpenAIRE

    Elias Mabaso; Siambabala B. Manyena

    2013-01-01

    With the increasing frequency, magnitude and impact of disasters, there is growing focus on contingency planning as a tool for enhancing resilience. Yet, there is little empirical evidence that reflects on the practice of contingency planning systems within the context of disaster risk reduction. This article explores the practice of contingency planning in southern Africa, focussing on Malawi, Mozambique, Namibia, Zambia and Zimbabwe. A qualitative comparative analysis informed by fieldwork ...

  12. Measuring the social value of nuclear energy using contingent valuation methodology

    International Nuclear Information System (INIS)

    Jun, Eunju; Joon Kim, Won; Hoon Jeong, Yong; Heung Chang, Soon

    2010-01-01

    As one of the promising energy sources for the next few decades, nuclear energy receives more attention than before as environmental issues become more important and the supply of fossil fuels becomes unstable. One of the reasons for this attention is based on the rapid innovation of nuclear technology which solves many of its technological constraints and safety issues. However, regardless of these rapid innovations, social acceptance for nuclear energy has been relatively low and unchanged. Consequently, the social perception has often been an obstacle to the development and execution of nuclear policy requiring enormous subsidies which are not based on the social value of nuclear energy. Therefore, in this study, we estimate the social value of nuclear energy-consumers' willingness-to-pay for nuclear energy-using the Contingent Valuation Method (CVM) and suggest that the social value of nuclear energy increases approximately 68.5% with the provision of adequate information about nuclear energy to the public. Consequently, we suggest that the social acceptance management in nuclear policy development is important along with nuclear technology innovation.

  13. Trends and characteristics observed in nuclear events based on international nuclear event scale reports

    International Nuclear Information System (INIS)

    Watanabe, Norio

    2001-01-01

    The International Nuclear Event Scale (INES) is jointly operated by the IAEA and the OECD-NEA as a means designed for providing prompt, clear and consistent information related to nuclear events, that occurred at nuclear facilities, and facilitating communication between the nuclear community, the media and the public. Nuclear events are reported to the INES with the Scale', a consistent safety significance indicator, which runs from level 0, for events with no safety significance, to level 7 for a major accident with widespread health and environmental effects. Since the operation of INES was initiated in 1990, approximately 500 events have been reported and disseminated. The present paper discusses the trends observed in nuclear events, such as overall trends of the reported events and characteristics of safety significant events with level 2 or higher, based on the INES reports. (author)

  14. Contingent Attentional Capture by Top-Down Control Settings: Converging Evidence from Event-Related Potentials

    Science.gov (United States)

    Lien, Mei-Ching; Ruthruff, Eric; Goodin, Zachary; Remington, Roger W.

    2008-01-01

    Theories of attentional control are divided over whether the capture of spatial attention depends primarily on stimulus salience or is contingent on attentional control settings induced by task demands. The authors addressed this issue using the N2-posterior-contralateral (N2pc) effect, a component of the event-related brain potential thought to…

  15. Contingency planning: preparation of contingency plans

    DEFF Research Database (Denmark)

    Westergaard, J M

    2008-01-01

    . The risk of introducing disease pathogens into a country and the spread of the agent within a country depends on a number of factors including import controls, movement of animals and animal products and the biosecurity applied by livestock producers. An adequate contingency plan is an important instrument...... in the preparation for and the handling of an epidemic. The legislation of the European Union requires that all Member States draw up a contingency plan which specifies the national measures required to maintain a high level of awareness and preparedness and is to be implemented in the event of disease outbreak...

  16. Nuclear Security Systems and Measures for Major Public Events. Implementing Guide (Russian Edition)

    International Nuclear Information System (INIS)

    2014-01-01

    Terrorism remains a threat to international stability and security. High profile international and national major public events occur regularly, capturing great public interest and receiving intense media coverage. It is widely acknowledged that there is a substantial threat of a terrorist attack on major public events such as high profile political or economic summit meetings or major sporting contests. The threat of nuclear and radiological terrorism remains on the international security agenda. Nevertheless, to reduce this risk, the international community has made great progress in securing nuclear and other radioactive material that could otherwise be used in a terrorist act. This progress is contingent on the efforts of all States to adopt strong nuclear security systems and measures. There are large quantities of diverse radioactive material in existence, which are used in areas such as health, the environment, agriculture and industry. The hazards of this material vary according to composition and intensity. Additionally, the use of explosives in combination with this material can drastically enhance the impact of a criminal or terrorist act. If a criminal or terrorist group managed to detonate a so-called 'dirty' bomb in an urban area, the result could be mass panic, widespread radioactive contamination and major economic and social disruption. Major public events are seldom held in the same State or at the same location or even at the same venue. At the national level, the hosting of major public events with proper nuclear security arrangements can provide a foundation on which to build an enduring national framework for nuclear security; one that can exist long after the event. The organization of a major public event in which large numbers of people congregate presents complex security challenges for the State hosting such an event. Criminal or terrorist acts involving nuclear or other radioactive material at any major public event could result in

  17. A methodology to assist in contingency planning for protection of nuclear power plants against land vehicle bombs

    International Nuclear Information System (INIS)

    James, J.W.; Goldman, L.A.; Lobner, P.R.; Finn, S.P.; Koch, T.H.; Veatch, J.D.

    1989-04-01

    This report provides a methodology which could be used by operators of licensed nuclear power reactors to address issues related to contingency planning for a land vehicle bomb, should such a threat arise. The methodology presented in this report provides a structured framework for understanding factors to be considered in contingency planning for a land vehicle bomb including: (1) system options available to maintain a safe condition, (2) associated components and equipment, (3) preferred system options for establishing and maintaining a safe shutdown condition, and (4) contingency measures to preserve the preferred system options. Example applications of the methodology for a Boiling Water Reactor (BWR) and Pressurized Water Reactor (PWR) are provided along with an example of contingency plan changes necessary for implementation of this methodology, a discussion of some contingency measures that can be used to limit land vehicle access, and a bibliography. 2 refs., 11 figs., 6 tabs

  18. Assessing Energy Intake in Daily Life: Signal-Contingent Smartphone Application Versus Event-Contingent Paper and Pencil Estimated Diet Diary

    Directory of Open Access Journals (Sweden)

    Saskia Wouters

    2016-12-01

    Full Text Available Objectives: Investigating between-meal snack intake and its associated determinants such as emotions and stress presents challenges because both vary from moment to moment throughout the day. A smartphone application (app, was developed to map momentary between-meal snack intake and its associated determinants in the context of daily life. The aim of this study was to compare energy intake reported with the signal-contingent app and reported with an event-contingent paper and pencil diet diary. Methods: In a counterbalanced, cross-sectional design, adults (N = 46 from the general population reported between-meal snack intake during four consecutive days with the app and four consecutive days with a paper and pencil diet diary. A 10-day interval was applied between the two reporting periods. Multilevel regression analyses were conducted to compare both instruments on reported momentary and daily energy intake from snacks.  Results: Results showed no significant difference (B = 11.84, p = .14 in momentary energy intake from snacks between the two instruments. However, a significant difference (B = –105.89, p < .01 was found on energy intake from total daily snack consumption. Conclusions: As at momentary level both instruments were comparable in assessing energy intake, research purposes will largely determine the sampling procedure of choice. When momentary associations across time are the interest of study, a signal-contingent sampling procedure may be a suitable method. Since the compared instruments differed on two main features (i.e. the sampling procedure and the device used it is difficult to disentangle which instrument was the most accurate in assessing daily energy intake.

  19. Safety related events at nuclear installations in 1995

    DEFF Research Database (Denmark)

    Korsbech, Uffe C C

    1996-01-01

    Nuclear safety related events of significance at least corresponding to level 2 of the International Nuclear Event Scale are described. In 1995 only two events occured at nuclear power plants, and four events occured at plants using ionizing radiation for processing or research.......Nuclear safety related events of significance at least corresponding to level 2 of the International Nuclear Event Scale are described. In 1995 only two events occured at nuclear power plants, and four events occured at plants using ionizing radiation for processing or research....

  20. Searching for Plausible N-k Contingencies Endangering Voltage Stability

    DEFF Research Database (Denmark)

    Weckesser, Johannes Tilman Gabriel; Van Cutsem, Thierry

    2017-01-01

    This paper presents a novel search algorithm using time-domain simulations to identify plausible N − k contingencies endangering voltage stability. Starting from an initial list of disturbances, progressively more severe contingencies are investigated. After simulation of a N − k contingency......, the simulation results are assessed. If the system response is unstable, a plausible harmful contingency sequence has been found. Otherwise, components affected by the contingencies are considered as candidate next event leading to N − (k + 1) contingencies. This implicitly takes into account hidden failures...

  1. Contingency proportion systematically influences contingency learning.

    Science.gov (United States)

    Forrin, Noah D; MacLeod, Colin M

    2018-01-01

    In the color-word contingency learning paradigm, each word appears more often in one color (high contingency) than in the other colors (low contingency). Shortly after beginning the task, color identification responses become faster on the high-contingency trials than on the low-contingency trials-the contingency learning effect. Across five groups, we varied the high-contingency proportion in 10% steps, from 80% to 40%. The size of the contingency learning effect was positively related to high-contingency proportion, with the effect disappearing when high contingency was reduced to 40%. At the two highest contingency proportions, the magnitude of the effect increased over trials, the pattern suggesting that there was an increasing cost for the low-contingency trials rather than an increasing benefit for the high-contingency trials. Overall, the results fit a modified version of Schmidt's (2013, Acta Psychologica, 142, 119-126) parallel episodic processing account in which prior trial instances are routinely retrieved from memory and influence current trial performance.

  2. A contingency safe, responsible, economic, increased capacity spent nuclear fuel (SNF) advance fuel cycle

    International Nuclear Information System (INIS)

    Levy, S.

    2008-01-01

    The purpose of this paper is to have an Advanced Light Water (LWR) fuel cycle and an associated development program to provide a contingency plan to the current DOE effort to license once-through spent Light Water Reactor (LWR) fuel for disposition at Yucca Mountain (YM). The intent is to fully support the forthcoming June 2008 DOE submittal to the Nuclear Regulatory Commission (NRC) based upon the latest DOE draft DOE/EIS-0250F-SID dated October 2007 which shows that the latest DOE YM doses would readily satisfy the anticipated NRC and Environmental Protection Agency (EP) standards. The proposed Advance Fuel Cycle can offer potential resolution of obstacles that might arise during the NRC review and, particularly, during the final hearings process to be held in Nevada. Another reason for the proposed concept is that a substantial capacity growth of the YM repository will be necessary to accommodate the SNF of Advance Light Water Reactors (ALWRs) currently under consideration for United States (U.S.) electricity production (1) and the results of the recently issued study by the Electric Power Research Institute (EPRI) to reduce CO 2 emissions (2). That study predicts that by 2030 U.S. nuclear power generation would grow by 64 Gigawatt electrical (GWe) and account for 25.5 percent of the overall U.S. electrical generation. The current annual SNF once-through fuel cycle accumulation would rise from 2000-2100 MT (Metric Tons) to about 3480 MT in 2030 and the total SNF inventory, would reach nearly 500,000 MT by 2100 if U. S. nuclear power continues to grow at 1.1 percent per year after 2030. That last projection does not account for any SNF reduction due to increased fuel burnup or any increased capacity needed 'to establish supply Global Nuclear Energy Partnership (GNEP,) arrangements among nations to provide nuclear fuel and taking back spent fuel for recycling without spreading enrichment and reprocessing technologies' (3). The anticipated capacity of 120 MT

  3. Contingency planning for nuclear plants: an approach for use in industrial plants and hazardous products storage facilities

    Energy Technology Data Exchange (ETDEWEB)

    Carvalho, Paulo Roberto Werneck de, E-mail: paulo@pwerneck.com [Universidade Federal Fluminense (UFF), Angra dos Reis, RJ (Brazil); Hora, Antonio Ferreira da, E-mail: dahora@vm.uff.br [Universidade Federal Fluminense (UFF), Niteroi, RJ (Brazil)

    2015-07-01

    The purpose of this paper is establishing a basic system model for the development of contingency plans for emergencies. This includes the identification of agents involved in aid and assistance planning, pointing out communication chains among them, the delegation of action coordination and control, as well as the composition and structure of crisis centers equipped with physical and technological resources, the development of emergency procedures, the training of the teams involved, drill planning, and a policy for interactions with community members and the media in the course of a crisis. This paper aims at proposing actions in case an emergency affects the surroundings areas to the accident site. The outlined propositions are not to be adopted only under nuclear or radiological emergencies, since Brazil has specific legislation for this purpose, as established in the Brazilian Nuclear Program Protection System (SIPRON), in addition to the structures and contingency plans currently implemented, validated and periodically tested. (author)

  4. Contingency planning for nuclear plants: an approach for use in industrial plants and hazardous products storage facilities

    International Nuclear Information System (INIS)

    Carvalho, Paulo Roberto Werneck de; Hora, Antonio Ferreira da

    2015-01-01

    The purpose of this paper is establishing a basic system model for the development of contingency plans for emergencies. This includes the identification of agents involved in aid and assistance planning, pointing out communication chains among them, the delegation of action coordination and control, as well as the composition and structure of crisis centers equipped with physical and technological resources, the development of emergency procedures, the training of the teams involved, drill planning, and a policy for interactions with community members and the media in the course of a crisis. This paper aims at proposing actions in case an emergency affects the surroundings areas to the accident site. The outlined propositions are not to be adopted only under nuclear or radiological emergencies, since Brazil has specific legislation for this purpose, as established in the Brazilian Nuclear Program Protection System (SIPRON), in addition to the structures and contingency plans currently implemented, validated and periodically tested. (author)

  5. Exploratory trend and pattern analysis of 1981 through 1983 Licensee Event Report data. Main report. Volume 1

    International Nuclear Information System (INIS)

    Hester, O.V.; Groh, M.R.; Farmer, F.G.

    1986-10-01

    This report presents an overview of the 1981 through 1983 Sequence Coding and Search System (SCSS) data base that contains nuclear power plant operational data derived from Licensee Event Reports (LERs) submitted to the United States Nuclear Regulatory Commission (USNRC). Both overall event reporting and events related to specific components, subsystems, systems, and personnel are discussed. At all of these levels of information, software is used to generate count data for contingency tables. Contingency table analysis is the main tool for the trend and pattern analysis. The tables focus primarily on faults associated with various components and other items of interest across different plants. The abstracts and other SCSS information on the LERs accounting for unusual counts in the tables were examined to gain insights from the events. Trends and patterns in LER reporting and reporting of events for various component groups were examined through log-linear modeling techniques

  6. 25 CFR 39.501 - What is an emergency or unforeseen contingency?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What is an emergency or unforeseen contingency? 39.501... EQUALIZATION PROGRAM Contingency Fund § 39.501 What is an emergency or unforeseen contingency? An emergency or unforeseen contingency is an event that meets all of the following criteria: (a) It could not be planned for...

  7. International scaling of nuclear and radiological events

    International Nuclear Information System (INIS)

    Wang Yuhui; Wang Haidan

    2014-01-01

    Scales are inherent forms of measurement used in daily life, just like Celsius or Fahrenheit scales for temperature and Richter for scale for earthquakes. Jointly developed by the IAEA and OECD/NEA in 1990, the purpose of International Nuclear and Radiological Event Scale (INES) is to help nuclear and radiation safety authorities and the nuclear industry worldwide to rate nuclear and radiological events and to communicate their safety significance to the general public, the media and the technical community. INES was initially used to classify events at nuclear power plants only. It was subsequently extended to rate events associated with the transport, storage and use of radioactive material and radiation sources, from those occurring at nuclear facilities to those associated with industrial use. Since its inception, it has been adopted in 69 countries. Events are classified on the scale at seven levels: Levels 1-3 are called 'incidents' and Levels 4-7 'accidents'. The scale is designed so that the severity of an event is about ten times greater for each increase in level on the scale. Events without safety significance are called 'deviations' and are classified Below Scale/Level 0. INES classifies nuclear and radiological accidents and incidents by considering three areas of impact: People and the Environment; Radiological Barriers and Control; Defence-in-Depth. By now, two nuclear accidents were on the highest level of the scale: Chernobyl and Fukumashi. (authors)

  8. Measuring the Social Value of Nuclear Energy using Contingent Valuation Methodology

    International Nuclear Information System (INIS)

    Jun, Eun Ju; Kim, Won Joon; Chang, Soon Heung

    2009-01-01

    In recent years, in addition to unstable energy supply and volatile energy prices, environmental concerns make energy security as the principal objective of energy policy in many nations. The International Energy Agency (2007) released what is probably its most pessimistic World Energy Outlook to date saying that oil and natural gas imports, coal use and greenhouse gas emissions are set to grow inexorably through 2030 - trends that threaten to undermine energy security and accelerate climate change, if countries do not change their energy use policies. In near term, nuclear is expected to be accepted as one of the promising alternatives which can achieve both energy security and prevention of climate change. However, nuclear energy has some vulnerable points in the view of social acceptance due to the history of its development and previous. Many countries which use nuclear power as one the major energy sources have been solving the problem of low social acceptance of nuclear energy by allocating enormous subsidy to local government. Korea decided to give 300 million dollar to the local government, Gyeongjoo, for constructing low level waste management facilities. Japan also paid 120 million dollar to Rokkasho-mura area for constructing nuclear waste repository. Sellarfield in England, Cabril in Spain also received subsidy every year from the related industries and their government. However these subsidies were provided without any appropriate estimation for the value of risk taking of nuclear energy. In addition, those subsidies are expected to increase and burden the central government for the further development and usage of nuclear. This study, therefore, aims to evaluate the value of nuclear energy in view of social acceptance in order to contribute to effective application for the future nuclear development and policy making. We estimate the Willingness-To-Pay of nuclear energy using Contingent Valuation Method (CVM). We find high social cost of nuclear

  9. A comparison of analysis methods to estimate contingency strength.

    Science.gov (United States)

    Lloyd, Blair P; Staubitz, Johanna L; Tapp, Jon T

    2018-05-09

    To date, several data analysis methods have been used to estimate contingency strength, yet few studies have compared these methods directly. To compare the relative precision and sensitivity of four analysis methods (i.e., exhaustive event-based, nonexhaustive event-based, concurrent interval, concurrent+lag interval), we applied all methods to a simulated data set in which several response-dependent and response-independent schedules of reinforcement were programmed. We evaluated the degree to which contingency strength estimates produced from each method (a) corresponded with expected values for response-dependent schedules and (b) showed sensitivity to parametric manipulations of response-independent reinforcement. Results indicated both event-based methods produced contingency strength estimates that aligned with expected values for response-dependent schedules, but differed in sensitivity to response-independent reinforcement. The precision of interval-based methods varied by analysis method (concurrent vs. concurrent+lag) and schedule type (continuous vs. partial), and showed similar sensitivities to response-independent reinforcement. Recommendations and considerations for measuring contingencies are identified. © 2018 Society for the Experimental Analysis of Behavior.

  10. Application of the double-contingency principle within BNFL

    International Nuclear Information System (INIS)

    Strafford, P.I.D.

    1995-01-01

    Historically, the double-contingency principle has been used for criticality assessment within British Nuclear Fuels plc (BNFL). This paper outlines what is understood by the double-contingency principle to illustrate how it is applied in criticality safety assessments and to highlight various problem areas that are encountered and, where possible, how they might be solved

  11. Application of IAEA's International Nuclear Event Scale to events at testing/research reactors in Japan

    International Nuclear Information System (INIS)

    Nozawa, Masao; Watanabe, Norio

    1999-01-01

    The International Nuclear Event Scale (INES) is a means for providing prompt, clear and consistent information related to nuclear events and facilitating communication between the nuclear community, the media and the public on such events. This paper describes the INES rating process for events at testing/research reactors and nuclear fuel processing facilities and experience on the application of the INES scale in Japan. (author)

  12. Practical application of double-contingency protection

    International Nuclear Information System (INIS)

    Kent, N.A.; Sanders, C.F.

    1995-01-01

    The Westinghouse Commercial Fuel Fabrication Facility in Columbia, South Carolina, manufactures fuel assemblies and core components for the commercial nuclear power industry. The ammonium diurinate conversion process converts low-enriched ( 235 U) uranium hexafluoride (UF 6 ) or uranyl nitrate into ceramic-grade uranium dioxide (UO 2 ) powder. The UO 2 powder is then tumble blended in 1700-kg containers to ensure powder homogeneity and obtain necessary enrichments. The double-contingency principle is applied to all systems, processes, and components in which special nuclear material is processed, handled, or stored to ensure that an acceptable nuclear criticality margin of safety is maintained. The Nuclear Criticality Safety (NCS) Program at the Columbia plant is divided into three primary functions: analysis and evaluation, implementation, and compliance. The primary task in analysis and evaluation is to develop comprehensive criticality safety evaluations for all proposed new installations and system modifications. These evaluations involve identifying which of the nine physical process parameters directly affect neutron multiplication and establishing bounding assumptions and criticality safety limits (CSLs). The implementation function primarily consists of translating the open-quotes NCS-speakclose quotes (parameters, k eff , contingencies, barriers, controls, etc.) into operator language (procedural requirements, valve positions, flow rates, pressures, temperatures, etc.) and communicating this information clearly to the manufacturing function through procedures and training. The compliance function deals primarily with conducting criticality safety inspections, audits, and process upset investigations. This paper presents two examples of the challenges associated with the practical implementation of the double-contingency principle to the chemical manufacturing process at the Columbia plant

  13. The International Nuclear and Radiological Event Scale (INES): 20 Years of Nuclear Communication

    International Nuclear Information System (INIS)

    2010-01-01

    Full text: Today, the International Atomic Energy Agency (IAEA) and the OECD Nuclear Energy Agency (NEA) are celebrating the 20th anniversary of the International Nuclear and Radiological Event Scale (INES). Jointly developed by the IAEA and the NEA in 1990, in the aftermath of the Chernobyl accident, the purpose of INES is to help nuclear and radiation safety authorities and the nuclear industry worldwide to rate nuclear and radiological events and to communicate their safety significance to the general public, the media and the technical community. INES has often been compared to other scales used to measure physical properties such as temperature - the Celsius, Kelvin or Fahrenheit scales - or rate events such as earthquakes - the Richter scale. Like these scales, INES also has a sound technical background and can be easily understood. INES was initially used to classify events at nuclear power plants only. It was subsequently extended to rate events occurring in any nuclear facility and during the transport of radioactive material, thus also covering events related to the overexposure of workers. Since 2008, INES has been extended to any event associated with the transport, storage and use of radioactive material and radiation sources, from those occurring at nuclear facilities to those associated with industrial use. More generally, INES has also become a crucial nuclear communications tool. Since its inception, it has been adopted in 69 countries, and an increasing number of countries have expressed their interest in using INES and have designated INES national officers. Over the years, national nuclear safety authorities have made growing use of INES, while the public and the media have become more familiar with the scale and its significance. This is where the true success of INES stands, having helped to foster transparency and provide a better understanding of nuclear-related events and activities. For a full description of the International Nuclear and

  14. Simple probabilistic method for relative risk evaluation of nuclear terrorism events

    International Nuclear Information System (INIS)

    Zhang Songbai; Wu Jun

    2006-01-01

    On the basis of the event-tree and probability analysis methods, a probabilistic method of nuclear terrorism risk was built, and the risk of terrorism events was analyzed. With the statistical data for and hypothetical data for relative events, the relative probabilities of the four kinds of nuclear terrorism events were obtained, as well as the relative risks of these four kinds of nuclear terrorism events were calculated by using this probabilistic method. The illustrated case show that the descending sequence of damages from the four kinds of nuclear terrorism events for single event is as following: nuclear explosive and improvised nuclear explosive, nuclear facility attacked, and 'dirty bomb'. Under the hypothetical condition, the descending sequence of possibilities for the four kinds of nuclear terrorism events is as following: 'dirty bomb', nuclear facility attacked, improvised nuclear explosive and nuclear explosive, but the descending sequence of risks is as following: 'dirty bomb', improvised nuclear explosive, nuclear facility attacked, and nuclear explosive . (authors)

  15. Evaluating the public perceptions of nuclear power in China: Evidence from a contingent valuation survey

    International Nuclear Information System (INIS)

    Sun, Chuanwang; Zhu, Xiting

    2014-01-01

    After the Fukushima nuclear accident, more and more attention has been paid to the safety issues of nuclear power in China, even though it is a clean and necessary substitution to coal power. Due to the consideration about the uncertainty of nuclear safety, the local citizens may resist the nuclear power programs in their neighborhood, as indicated by the anti-nuclear movement in Jiangmen 2013. This phenomenon is often related to the public perceptions of “not-in-my-back-yard” (NIMABY). The explosion of anti-nuclear movements will impose adverse effects on the nuclear power decision-making in China. Based on the Contingent Valuation Method (CVM), we evaluate the public Willingness-To-Pay (WTP) for avoiding the construction of nuclear power plants in their neighborhood. Moreover, we analyze whether more information about nuclear energy could improve the public acceptance. Our results show that the comprehensive information will decrease the public risk perception of nuclear power and increase the public support for nuclear power policy. This paper further suggests that China's decision makers should improve policy transparency and encourage the public involvement of nuclear energy decision making. - Highlights: • We firstly evaluate the WTP for avoiding nuclear construction in China. • The study is based on the CV survey data after the Fukushima accident. • More understanding of nuclear energy could improve public acceptance. • Decision-makers should improve policy transparency and public involvement

  16. Suited Contingency Ops Food - 2

    Science.gov (United States)

    Glass, J. W.; Leong, M. L.; Douglas, G. L.

    2014-01-01

    The contingency scenario for an emergency cabin depressurization event may require crewmembers to subsist in a pressurized suit for up to 144 hours. This scenario requires the capability for safe nutrition delivery through a helmet feed port against a 4 psi pressure differential to enable crewmembers to maintain strength and cognition to perform critical tasks. Two nutritional delivery prototypes were developed and analyzed for compatibility with the helmet feed port interface and for operational effectiveness against the pressure differential. The bag-in-bag (BiB) prototype, designed to equalize the suit pressure with the beverage pouch and enable a crewmember to drink normally, delivered water successfully to three different subjects in suits pressurized to 4 psi. The Boa restrainer pouch, designed to provide mechanical leverage to overcome the pressure differential, did not operate sufficiently. Guidelines were developed and compiled for contingency beverages that provide macro-nutritional requirements, a minimum one-year shelf life, and compatibility with the delivery hardware. Evaluation results and food product parameters have the potential to be used to improve future prototype designs and develop complete nutritional beverages for contingency events. These feeding capabilities would have additional use on extended surface mission EVAs, where the current in-suit drinking device may be insufficient.

  17. Establishment of nuclear knowledge and information infrastructure; establishment of web-based database system for nuclear events

    Energy Technology Data Exchange (ETDEWEB)

    Park, W. J.; Kim, K. J. [Korea Atomic Energy Research Institute , Taejeon (Korea); Lee, S. H. [Korea Institute of Nuclear Safety, Taejeon (Korea)

    2001-05-01

    Nuclear events data reported by nuclear power plants are useful to prevent nuclear accidents at the power plant by examine the cause of initiating events and removal of weak points in the aspects of operational safety, and to improve nuclear safety in design and operation stages by backfitting operational experiences and practices 'Nuclear Event Evaluation Database : NEED' system distributed by CD-ROM media are upgraded to the NEED-Web (Web-based Nuclear Event Evaluation Database) version to manage event data using database system on network basis and the event data and the statistics are provided to the authorized users in the Nuclear Portal Site and publics through Internet Web services. The efforts to establish the NEED-Web system will improve the integrity of events data occurred in Korean nuclear power plant and the usability of data services, and enhance the confidence building and the transparency to the public in nuclear safety. 11 refs., 27 figs. (Author)

  18. INES: The International Nuclear Event Scale. User's manual

    International Nuclear Information System (INIS)

    1990-08-01

    The International Nuclear Event Scale (INES) is being introduced for a trial period, the primary purpose being to facilitate communication between the nuclear community, the media and the public on such events. The scale runs from zero, for events with no safety significance, to seven for a major accident. The scale has been circulated to Member States of the International Atomic Energy Agency (IAEA) and the Nuclear Energy Agency of the Organisation for Economic Co-operation and Development and it is presently anticipated that the trial period will last until late 1991. Provision has been made for the scale to be refined thereafter in the light of experience. It is designed as an important tool in providing prompt, clear and consistent information on nuclear events wherever and whenever they may occur. 2 figs, 2 tabs

  19. APPROPRIATE ALLOCATION OF CONTINGENCY USING RISK ANALYSIS METHODOLOGY

    Directory of Open Access Journals (Sweden)

    Andi Andi

    2004-01-01

    Full Text Available Many cost overruns in the world of construction are attributable to either unforeseen events or foreseen events for which uncertainty was not appropriately accommodated. It is argued that a significant improvement to project management performance may result from greater attention to the process of analyzing project risks. The objective of this paper is to propose a risk analysis methodology for appropriate allocation of contingency in project cost estimation. In the first step, project risks will be identified. Influence diagramming technique is employed to identify and to show how the risks affect the project cost elements and also the relationships among the risks themselves. The second step is to assess the project costs with regards to the risks under consideration. Using a linguistic approach, the degree of uncertainty of identified project risks is assessed and quantified. The problem of dependency between risks is taken into consideration during this analysis. For the final step, as the main purpose of this paper, a method for allocating appropriate contingency is presented. Two types of contingencies, i.e. project contingency and management reserve are proposed to accommodate the risks. An illustrative example is presented at the end to show the application of the methodology.

  20. The Principal of International Nuclear Event Scale Determination and Its Implementation

    International Nuclear Information System (INIS)

    Piping Supriatna

    2006-01-01

    International Nuclear Event Scale (INES) is a scale system for determination nuclear event level on an international scale. Comprehension of INES system commonly as a way to motivate communication between nuclear management and the public, in accordance with disturbance to public safety level as the impact of nuclear installation accident. By using INES as the scaling system, the nuclear event is easy to be understood by nuclear group, journalist or by the public directly. In this report has been analyzed the procedure of nuclear event level determination refer to INES scaling system and its implementation in the field. In order to get same perception in determination of nuclear event level, it is necessary to improve full comprehension for INES and its implementation. (author)

  1. A methodology for nuclear power plant operational events evaluation

    International Nuclear Information System (INIS)

    Araujo, Jeferson

    2015-01-01

    Operational events are normal occurrences in industrial plants and in nuclear power plants. The evaluation of operational events gains importance when it comes specifically to nuclear power plants due to the proportions that the impact and the consequences of these events may cause to the installation itself, their workers, the external area of the nuclear installation, the environment and to the public in general. These consequences, for the operation of these facilities can range from very little, until the consequences that lead to accidents and can cause significant impacts. Operational events may be associated or have influence in many fields of knowledge, such as operation, maintenance, engineering, Radiological Protection, physical protection, chemistry, Human or Organizational Factors and external events, among others. The accident at the Fukushima Daichi nuclear power plant, shows the importance of exhausting all the studies concerning operational events in order to improve the operational safety of nuclear plants, considering all the causes and possible consequences. In this context, the evaluation of operational events discipline emerges as an important and relevant tool to contribute to the maintenance and/or improvement of the operational safety of nuclear installations. Not without reason the nuclear industry actively participates in programs of exchange of operational experience, where relevant events are thoroughly evaluated and discussed in specific forums, such as power plant operators, regulators and/or joint technical meetings, always with the purpose to prevent, minimize or mitigate its consequences. Any evaluation of operational events passes necessarily by an in-depth study of the circumstances of the event, culminating with the identification of your cause and proposition of corrective actions to prevent recurrence of similar events. Additionally, the events should not be studied individually, but evaluated within a temporal context in order

  2. A methodology for nuclear power plant operational events evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Araujo, Jeferson, E-mail: jeferson@cnen.gov.br [Comissao Nacional de Energia Nuclear (CGRC/CNEN), Rio de janeiro, RJ (Brazil). Coordenacao Geral de Reatores e do Ciclo de Combustivel; Costa, Sergio Dias, E-mail: sergiodiascosta@hotmail.com [Instituto de Engenharia Nuclear (IEN/CNEN-RJ), Rio de Janeiro, RJ (Brazil)

    2015-07-01

    Operational events are normal occurrences in industrial plants and in nuclear power plants. The evaluation of operational events gains importance when it comes specifically to nuclear power plants due to the proportions that the impact and the consequences of these events may cause to the installation itself, their workers, the external area of the nuclear installation, the environment and to the public in general. These consequences, for the operation of these facilities can range from very little, until the consequences that lead to accidents and can cause significant impacts. Operational events may be associated or have influence in many fields of knowledge, such as operation, maintenance, engineering, Radiological Protection, physical protection, chemistry, Human or Organizational Factors and external events, among others. The accident at the Fukushima Daichi nuclear power plant, shows the importance of exhausting all the studies concerning operational events in order to improve the operational safety of nuclear plants, considering all the causes and possible consequences. In this context, the evaluation of operational events discipline emerges as an important and relevant tool to contribute to the maintenance and/or improvement of the operational safety of nuclear installations. Not without reason the nuclear industry actively participates in programs of exchange of operational experience, where relevant events are thoroughly evaluated and discussed in specific forums, such as power plant operators, regulators and/or joint technical meetings, always with the purpose to prevent, minimize or mitigate its consequences. Any evaluation of operational events passes necessarily by an in-depth study of the circumstances of the event, culminating with the identification of your cause and proposition of corrective actions to prevent recurrence of similar events. Additionally, the events should not be studied individually, but evaluated within a temporal context in order

  3. Power plant construction lead times: The value of contingency planning

    International Nuclear Information System (INIS)

    Rubin, L.J.

    1985-01-01

    In this paper an analysis of two different approaches to the construction of a major power plant (nuclear) is presented. The analysis compares an accelerated, ''go-for-broke'' strategy-which has some risk of being delayed-with a more deliberate contingency construction schedule in terms of revenue requirements and costs of electricity. It is demonstrated that under a wide variety of circumstances there are important advantages to the contingency strategy, but that the magnitude of those advantages is sensitive to the character of the power system being examined and to the flexibility of the contingency approach

  4. INES - The International Nuclear Event Scale. User's manual

    International Nuclear Information System (INIS)

    2005-01-01

    The International Nuclear Event Scale (INES) was introduced in March 1990 jointly by the International Atomic Energy Agency (IAEA) and the Nuclear Energy Agency of the Organisation for Economic Co-operation and Development (OECD/NEA). Its primary purpose is to facilitate communication and understanding between the nuclear community, the media and the public on the safety significance of events occurring at nuclear installations. The scale was refined in 1992 in the light of experience gained and extended to be applicable to any event associated with radioactive material and/or radiation, including the transport of radioactive materials. This edition of the INES User's Manual incorporates experience gained from applying the 1992 version of the scale and the document entitled 'Clarification of Issues Raised'. As such, it replaces those earlier publications. It does not amend the technical basis of the INES rating procedure but is expected to facilitate the task of those who are required to rate the safety significance of events using the INES scale. The INES communication network currently receives and disseminates event information to the INES National Officers of 60 Member States on special Event Rating Forms which represent official information on the events, including the rating. The INES communication process has led each participating country to set up an internal network which ensures that all events are promptly communicated and rated whenever they have to be reported outside or inside the country. The IAEA provides training services on the use of INES on request

  5. The dependency and contingency of politics

    DEFF Research Database (Denmark)

    Triantafillou, Peter

    2016-01-01

    differences which make any analytical synthesis both a difficult and a questionable endeavour. In particular, whereas historical institutionalism seeks to explain the present in terms of its dependence on past events, genealogy seeks to provoke the present by demonstrating its historical contingency. In spite...

  6. Extreme meteorological events and nuclear facilities safety

    International Nuclear Information System (INIS)

    Almeida, Patricia Moco Princisval

    2006-01-01

    An External Event is an event that originates outside the site and whose effects on the Nuclear Power Plants (NPP) should be considered. Such events could be of natural or human induced origin and should be identified and selected for design purposes during the site evaluation process. This work shows that the subtropics and mid latitudes of South America east of the Andes Mountain Range have been recognized as prone to severe convective weather. In Brazil, the events of tornadoes are becoming frequent; however there is no institutionalized procedure for a systematic documentation of severe weather. The information is done only for some scientists and by the newspapers. Like strong wind can affect the structural integrity of buildings or the pressure differential can affect the ventilation system, our concern is the safety of NPP and for this purpose the recommendations of International Atomic Energy Agency, Nuclear Regulatory Commission and Comissao Nacional de Energia Nuclear are showed and also a data base of tornadoes in Brazil is done. (author)

  7. Contingency and similarity in response selection.

    Science.gov (United States)

    Prinz, Wolfgang

    2018-05-09

    This paper explores issues of task representation in choice reaction time tasks. How is it possible, and what does it take, to represent such a task in a way that enables a performer to do the task in line with the prescriptions entailed in the instructions? First, a framework for task representation is outlined which combines the implementation of task sets and their use for performance with different kinds of representational operations (pertaining to feature compounds for event codes and code assemblies for task sets, respectively). Then, in a second step, the framework is itself embedded in the bigger picture of the classical debate on the roles of contingency and similarity for the formation of associations. The final conclusion is that both principles are needed and that the operation of similarity at the level of task sets requires and presupposes the operation of contingency at the level of event codes. Copyright © 2018 The Author. Published by Elsevier Inc. All rights reserved.

  8. INES: The International Nuclear Event Scale user's manual

    International Nuclear Information System (INIS)

    1992-09-01

    The revised and extended addition of the International Nuclear Event Scale is presented. The manual is comprised of four parts. Part 1 contains a summary of the basis of the scale and of the procedure to be used for rating events. Part 2 contains the detailed guidance required to rate events in terms of off-site and on-site impact. These two parts are applicable to all nuclear facilities. Parts 3 and 4 contain the detailed guidance required to rate events in terms of defence in depth for reactors and other facilities, respectively. 5 figs, 2 tabs

  9. Visits to Australia by nuclear powered or armed vessels: contingency planning for the accidental release of ionizing radiation

    International Nuclear Information System (INIS)

    1989-01-01

    The report refers to the adequacy of current contingency planning by the Australian Federal and Senate authorities to deal with the accidental release of ionizating radiation from visiting nuclear powered or armed vessels in Australian waters and ports. Much of the material was obtained in response to questions put in writing by the Senate Standing Committee to the Department of Defence, ANSTO and others. In addition, the report contains relevant information from Commonwealth documents as well as the Committee findings and recommendations. Issues considered include: types of visiting nuclear powered vessels, accident likelihood and consequences, differences between naval and land-based reactors, safety records. The persons or organizations who made submissions or appeared in all public hearings are listed in the appendixes, along with all visits to Australian ports by nuclear powered warships from 1976 to 1988

  10. Mini-Membrane Evaporator for Contingency Spacesuit Cooling

    Science.gov (United States)

    Makinen, Janice V.; Bue, Grant C.; Campbell, Colin; Petty, Brian; Craft, Jesse; Lynch, William; Wilkes, Robert; Vogel, Matthew

    2015-01-01

    The next-generation Advanced Extravehicular Mobility Unit (AEMU) Portable Life Support System (PLSS) is integrating a number of new technologies to improve reliability and functionality. One of these improvements is the development of the Auxiliary Cooling Loop (ACL) for contingency crewmember cooling. The ACL is a completely redundant, independent cooling system that consists of a small evaporative cooler--the Mini Membrane Evaporator (Mini-ME), independent pump, independent feedwater assembly and independent Liquid Cooling Garment (LCG). The Mini-ME utilizes the same hollow fiber technology featured in the full-sized AEMU PLSS cooling device, the Spacesuit Water Membrane Evaporator (SWME), but Mini-ME occupies only approximately 25% of the volume of SWME, thereby providing only the necessary crewmember cooling in a contingency situation. The ACL provides a number of benefits when compared with the current EMU PLSS contingency cooling technology, which relies upon a Secondary Oxygen Vessel; contingency crewmember cooling can be provided for a longer period of time, more contingency situations can be accounted for, no reliance on a Secondary Oxygen Vessel (SOV) for contingency cooling--thereby allowing a reduction in SOV size and pressure, and the ACL can be recharged-allowing the AEMU PLSS to be reused, even after a contingency event. The first iteration of Mini-ME was developed and tested in-house. Mini-ME is currently packaged in AEMU PLSS 2.0, where it is being tested in environments and situations that are representative of potential future Extravehicular Activities (EVA's). The second iteration of Mini-ME, known as Mini-ME2, is currently being developed to offer more heat rejection capability. The development of this contingency evaporative cooling system will contribute to a more robust and comprehensive AEMU PLSS.

  11. Relationship-contingent self-esteem and the ups and downs of romantic relationships.

    Science.gov (United States)

    Knee, C Raymond; Canevello, Amy; Bush, Amber L; Cook, Astrid

    2008-09-01

    Relationship-contingent self-esteem (RCSE) emerges from perspectives on authenticity, need fulfillment, and relationship functioning and is an unhealthy form of self-esteem that depends on one's relationship. Four studies provided evidence of convergent, discriminant, incremental, and predictive validity for RCSE. Study 1 tested associations between RCSE and several conceptually related and unrelated constructs in multiple samples. In Study 2, the authors employed an event-contingent diary procedure to examine reports of self-esteem as a function of everyday relationship events. The association between event valence and changes in self-esteem became stronger with RCSE, and this interaction remained controlling for several parallel interactions by other constructs. Study 3 employed an interval-contingent diary procedure and found support for a mediation model in which the moderating role of RCSE largely occurred through momentary emotions, which in turn predicted momentary self-esteem. Study 4 sampled couples and found that partners who were both higher in RCSE felt more committed but not more satisfied or close.

  12. A Study of the Impact of Peak Demand on Increasing Vulnerability of Cascading Failures to Extreme Contingency Events

    Energy Technology Data Exchange (ETDEWEB)

    Vyakaranam, Bharat GNVSR; Vallem, Mallikarjuna R.; Nguyen, Tony B.; Samaan, Nader A.; Berscheid, Alan P.; Makarov, Yuri V.; Diao, Ruisheng

    2017-10-02

    The vulnerability of large power systems to cascading failures and major blackouts has become evident since the Northeast blackout in 1965. Based on analyses of the series of cascading blackouts in the past decade, the research community realized the urgent need to develop better methods, tools, and practices for performing cascading-outage analysis and for evaluating mitigations that are easily accessible by utility planning engineers. PNNL has developed the Dynamic Contingency Analysis Tool (DCAT) as an open-platform and publicly available methodology to help develop applications that aim to improve the capabilities of power planning engineers to assess the impact and likelihood of extreme contingencies and potential cascading events across their systems and interconnections. DCAT analysis will help identify potential vulnerabilities and allow study of mitigation solutions to reduce the risk of cascading outages in technically sound and effective ways. Using the DCAT capability, we examined the impacts of various load conditions to identify situations in which the power grid may encounter cascading outages that could lead to potential blackouts. This paper describes the usefulness of the DCAT tool and how it helps to understand potential impacts of load demand on cascading failures on the power system.

  13. Dynamic Contingency Analysis Tool

    Energy Technology Data Exchange (ETDEWEB)

    2016-01-14

    The Dynamic Contingency Analysis Tool (DCAT) is an open-platform and publicly available methodology to help develop applications that aim to improve the capabilities of power system planning engineers to assess the impact and likelihood of extreme contingencies and potential cascading events across their systems and interconnections. Outputs from the DCAT will help find mitigation solutions to reduce the risk of cascading outages in technically sound and effective ways. The current prototype DCAT implementation has been developed as a Python code that accesses the simulation functions of the Siemens PSS/E planning tool (PSS/E). It has the following features: It uses a hybrid dynamic and steady-state approach to simulating the cascading outage sequences that includes fast dynamic and slower steady-state events. It integrates dynamic models with protection scheme models for generation, transmission, and load. It models special protection systems (SPSs)/remedial action schemes (RASs) and automatic and manual corrective actions. Overall, the DCAT attempts to bridge multiple gaps in cascading-outage analysis in a single, unique prototype tool capable of automatically simulating and analyzing cascading sequences in real systems using multiprocessor computers.While the DCAT has been implemented using PSS/E in Phase I of the study, other commercial software packages with similar capabilities can be used within the DCAT framework.

  14. Trend analysis of cables failure events at nuclear power plants

    International Nuclear Information System (INIS)

    Fushimi, Yasuyuki

    2007-01-01

    In this study, 152 failure events related with cables at overseas nuclear power plants are selected from Nuclear Information Database, which is owned by The Institute of Nuclear Safety System, and these events are analyzed in view of occurrence, causal factor, and so on. And 15 failure events related with cables at domestic nuclear power plants are selected from Nuclear Information Archives, which is owned by JANTI, and these events are analyzed by the same manner. As a result of comparing both trends, it is revealed following; 1) A cable insulator failure rate is lower at domestic nuclear power plants than at foreign ones. It is thought that a deterioration diagnosis is performed broadly in Japan. 2) Many buried cables failure events have been occupied a significant portion of cables failure events during work activity at overseas plants, however none has been occurred at domestic plants. It is thought that sufficient survey is conducted before excavating activity in Japan. 3) A domestic age related cables failure rate in service is lower than the overseas one and domestic improper maintenance rate is higher than the overseas one. Maintenance worker' a skill improvement is expected in order to reduce improper maintenance. (author)

  15. Inductive Double-Contingency Analysis of UO2 Powder Bulk Blending Operations at a Commercial Fuel Plant (U)

    International Nuclear Information System (INIS)

    Skiles, S. K.

    1994-01-01

    An inductive double-contingency analysis (DCA) method developed by the criticality safety function at the Savannah River Site, was applied in Criticality Safety Evaluations (CSEs) of five major plant process systems at the Westinghouse Electric Corporation's Commercial Nuclear Fuel Manufacturing Plant in Columbia, South Carolina (WEC-Cola.). The method emphasizes a thorough evaluation of the controls intended to provide barriers against criticality for postulated initiating events, and has been demonstrated effective at identifying common mode failure potential and interdependence among multiple controls. A description of the method and an example of its application is provided

  16. Nuclear facility safeguards systems modeling using discrete event simulation

    International Nuclear Information System (INIS)

    Engi, D.

    1977-01-01

    The threat of theft or dispersal of special nuclear material at a nuclear facility is treated by studying the temporal relationships between adversaries having authorized access to the facility (insiders) and safeguards system events by using a GASP IV discrete event simulation. The safeguards system events--detection, assessment, delay, communications, and neutralization--are modeled for the general insider adversary strategy which includes degradation of the safeguards system elements followed by an attempt to steal or disperse special nuclear material. The performance measure used in the analysis is the estimated probability of safeguards system success in countering the adversary based upon a predetermined set of adversary actions. An exemplary problem which includes generated results is presented for a hypothetical nuclear facility. The results illustrate representative information that could be utilized by safeguards decision-makers

  17. Power system security enhancement with unified power flow controller under multi-event contingency conditions

    Directory of Open Access Journals (Sweden)

    S. Ravindra

    2017-03-01

    Full Text Available Power system security analysis plays key role in enhancing the system security and to avoid the system collapse condition. In this paper, a novel severity function is formulated using transmission line loadings and bus voltage magnitude deviations. The proposed severity function and generation fuel cost objectives are analyzed under transmission line(s and/or generator(s contingency conditions. The system security under contingency conditions is analyzed using optimal power flow problem. An improved teaching learning based optimization (ITLBO algorithm has been presented. To enhance the system security under contingency conditions in the presence of unified power flow controller (UPFC, it is necessary to identify an optimal location to install this device. Voltage source based power injection model of UPFC, incorporation procedure and optimal location identification strategy based on line overload sensitivity indexes are proposed. The entire proposed methodology is tested on standard IEEE-30 bus test system with supporting numerical and graphical results.

  18. Protection of nuclear power plants against external events

    International Nuclear Information System (INIS)

    Suetterlin, L.

    1978-01-01

    The different aspects for the selection of external events to be accounted for in designing nuclear power plants and in defining load assumptions are illustrated: 1) In case of earthquake the severest possible events according to the state of science and technology are assumed. 2) For events where it is not or only to a certain extent possible to apply this method, e.g. in the load case airplane crash, load assumptions are defined in a combined probabilitic-deterministic way. By the example of plant protection, it is shown that by integrating all measures for protecting against interference of third parties (sabotage) or other external events, optimum protection concepts may be achieved. In all considerations on interference of third parties or other external events, one has to take into account that absolute protection is not possible. Nevertheless, it may be confirmed that nuclear power plants not only have a much higher level of protection than other, non-nuclear plants with equal or even higher potential hazard, but also that they meet the requirement not to increase significantly the current risk of society. (orig./HP) [de

  19. Temporal contingency.

    Science.gov (United States)

    Gallistel, C R; Craig, Andrew R; Shahan, Timothy A

    2014-01-01

    Contingency, and more particularly temporal contingency, has often figured in thinking about the nature of learning. However, it has never been formally defined in such a way as to make it a measure that can be applied to most animal learning protocols. We use elementary information theory to define contingency in such a way as to make it a measurable property of almost any conditioning protocol. We discuss how making it a measurable construct enables the exploration of the role of different contingencies in the acquisition and performance of classically and operantly conditioned behavior. Copyright © 2013 Elsevier B.V. All rights reserved.

  20. Temporal contingency

    Science.gov (United States)

    Gallistel, C.R.; Craig, Andrew R.; Shahan, Timothy A.

    2015-01-01

    Contingency, and more particularly temporal contingency, has often figured in thinking about the nature of learning. However, it has never been formally defined in such a way as to make it a measure that can be applied to most animal learning protocols. We use elementary information theory to define contingency in such a way as to make it a measurable property of almost any conditioning protocol. We discuss how making it a measurable construct enables the exploration of the role of different contingencies in the acquisition and performance of classically and operantly conditioned behavior. PMID:23994260

  1. Standard format and content of a licensee physical protection plan for strategic special nuclear material in transit - April 1980

    International Nuclear Information System (INIS)

    Anon.

    1981-01-01

    A predetermined plan to respond to safeguards contingency events is required to be prepared, based on personnel and other physical protection resources described in the Physical Protection Plan for strategic special nuclear material (SSNM) in transit. Specific requirements for the contingency plan are provided in Appendix C. Licensee Safeguards Contingency Plans, to 10 CFR Part 73. Regulatory Guide 5.56, Standard Format and Content of Safeguards Contingency Plans for Transportation, provides guidance for the preparation of transportation contingency plans. Licensee is reminded that all three submissions - the Physical Protection Plan, the Physical Protection Arrangements for Specific Shipments, and the Safeguards Contingency Plan - together describe the system for physical protection of each particular shipment. They should be developed and maintained to be completely consistent with each other for each shipment

  2. Modes of relating to contingency: An exploration of experiences in advanced cancer patients.

    Science.gov (United States)

    Kruizinga, Renske; Hartog, Iris D; Scherer-Rath, Michael; Schilderman, Hans; Van Laarhoven, Hanneke

    2017-08-01

    Throughout their lives, people are confronted with unexpected life events, which can be difficult to incorporate into their life narratives. Such a confrontation can result in an experience of contingency. Different ways of relating to contingency have been described by Wuchterl: denying, acknowledging, and "encounter with the Other." In the present article, we aim to trace these theoretical distinctions in real-life experiences of patients. We analyzed 45 interviews using the constant comparative method with a directed content analysis approach in the Atlas.ti coding program. The interviews originated from a randomized controlled trial evaluating an assisted reflection on life events and ultimate life goals. Seven spiritual counselors from six hospitals in the Netherlands conducted the interviews from July of 2014 to March of 2016. All 45 patients had advanced cancer. We found four different modes into which relating to contingency can be classified: denying, acknowledging, accepting, and receiving. With denying, patients did not mention any impact of the life event on their lives. In acknowledging, the impact was recognized and a start was made to incorporate the event into their life. In accepting, patients went through a process of reinterpretation of the event. In receiving, patients talked about receiving insights from their illness and living a more conscious life. Our study is the first to investigate the different ways of relating to contingency in clinical practice. The defined modes will improve our understanding of the various ways in which cancer patients relate to their disease, allowing caregivers to better target and shape individual care.

  3. Defense plan of Hydro-Quebec for extreme contingencies

    International Nuclear Information System (INIS)

    Trudel, Guilles; Bernard, Serge; Portales, Esteban

    2000-01-01

    In the last years, Hydro-Quebec it undertook an important program to improve the dependability of their net of energy transport. They concentrated the efforts on increasing the capacity of the net resist in the event of carries to an extreme contingency caused in general by multiple incidents or for successive disconnection of the lines of energy transport. To neutralize these contingencies, Hydro-Quebec it adopted a series of special measures that are contained under the general title of Plan of Defense for Extreme Contingencies. The objective of this plan is to detect the incidents that surpass the capacity of the net. It is completely automatic and it is based mainly in: A system of automatic disconnection of generation and tele-shot of loads; A system of automatic maneuver (opening and closing) of inductances shunt of 735 kw; A system of disconnection of loads for low voltage; A system of disconnection of loads for low frequency. The present document summarizes the orientations that there is taking Hydro-Quebec to protect its net in the event of extreme contingencies and it describes the different automatism that they are adopts, in particular the system automatic disconnection of generation and tele-shot of loads (RPTC) that is one of the main components of the defense plan. The system RPTC detects the simultaneous loss of several lines directly in 15 substations of 735 kw. It understands four places of automatic disconnection of generation and a centralized system of tele-shot of loads

  4. External man-induced events on nuclear power plants

    International Nuclear Information System (INIS)

    Paganini, C.E.

    1982-01-01

    These notes for the postgraduate course on Radiological Protection and Nuclear Safety deal with the effects produced by some human activities on the siting and design of a nuclear installation. The existing activities, as well as the foreseen or foreseeable future ones are evaluated. In the first place, the potential sources of events are identified and classified in two categories: stationary and mobile, and the events are classified in five groups: 1) Aircraft crash; 2) Chemical explosions; 3) Discharge of dangerous fluids (explosive, toxic or corrosive); 4) Fire, and 5) Sabotage, terrorism, guerrillas. Then, the effects which may result from these events and affect the nuclear installation are studied: 1) pressure waves; 2) Impact of missiles; 3) Heat, fire; 4) Smoke and dust; 5) Gas or inflammable and/or explosive dust clouds; 6) Toxic and/or corrosive gases and liquids; 7) Ground shaking; 8) Flooding or lack of water; 9) Foundations failure or collapse. Next, the methods for making a deterministic and/or a probabilistic study (or both) are indicated for each event considered, and from these studies the ''screening'' values which allow to determine if an event can be rejected or must be considered are established. For this second case, the method for obtaining the ''design event'' that shall serve as a basis for the design of the plant is indicated. (M.E.L.) [es

  5. FIREDATA, Nuclear Power Plant Fire Event Data Base

    International Nuclear Information System (INIS)

    Wheelis, W.T.

    2001-01-01

    1 - Description of program or function: FIREDATA contains raw fire event data from 1965 through June 1985. These data were obtained from a number of reference sources including the American Nuclear Insurers, Licensee Event Reports, Nuclear Power Experience, Electric Power Research Institute Fire Loss Data and then collated into one database developed in the personal computer database management system, dBASE III. FIREDATA is menu-driven and asks interactive questions of the user that allow searching of the database for various aspects of a fire such as: location, mode of plant operation at the time of the fire, means of detection and suppression, dollar loss, etc. Other features include the capability of searching for single or multiple criteria (using Boolean 'and' or 'or' logical operations), user-defined keyword searches of fire event descriptions, summary displays of fire event data by plant name of calendar date, and options for calculating the years of operating experience for all commercial nuclear power plants from any user-specified date and the ability to display general plant information. 2 - Method of solution: The six database files used to store nuclear power plant fire event information, FIRE, DESC, SUM, OPEXPER, OPEXBWR, and EXPERPWR, are accessed by software to display information meeting user-specified criteria or to perform numerical calculations (e.g., to determine the operating experience of a nuclear plant). FIRE contains specific searchable data relating to each of 354 fire events. A keyword concept is used to search each of the 31 separate entries or fields. DESC contains written descriptions of each of the fire events. SUM holds basic plant information for all plants proposed, under construction, in operation, or decommissioned. This includes the initial criticality and commercial operation dates, the physical location of the plant, and its operating capacity. OPEXPER contains date information and data on how various plant locations are

  6. Analysis on typical illegal events for nuclear safety class 1 valve

    International Nuclear Information System (INIS)

    Tian Dongqing; Gao Runsheng; Jiao Dianhui; Yang Lili; Chen Peng

    2014-01-01

    Illegal welding events of nuclear safety class l valve forging occurred to the manufacturer, while the valve was returned to be repaired. Illegal nondestructive test event of nuclear safety class valve occurred also to the manufacturer in the manufacturing process. The two events have resulted in quality incipient fault for the installed valves and the valves in the manufacturing process. It was reflected that operation of the factory quality assurance system isn't activated, and nuclear power engineering and operating company have insufficient supervision. The event-related parties should strengthen quality management and process control, get rid of the quality incipient fault, and experience feedback should be done well to guarantee quality of equipment in nuclear power plant. (authors)

  7. Analysis of external events - Nuclear Power Plant Dukovany

    International Nuclear Information System (INIS)

    Hladky, Milan

    2000-01-01

    PSA of external events at level 1 covers internal events, floods, fires, other external events are not included yet. Shutdown PSA takes into account internal events, floods, fires, heavy load drop, other external events are not included yet. Final safety analysis report was conducted after 10 years of operation for all Dukovany operational units. Probabilistic approach was used for analysis of aircraft drop and external man-induced events. The risk caused by man-induced events was found to be negligible and was accepted by State Office for Nuclear Safety (SONS)

  8. Recurring Events in the Finnish Nuclear Power Plants

    International Nuclear Information System (INIS)

    Suksi, Seija; Olander, Ronnie; Tiippana, Petteri

    2003-01-01

    An analysis and evaluation of event investigation methods applied by the Radiation and Nuclear Safety Authority (STUK), and the two Finnish nuclear power plant operators Teollisuuden Voima Oy (TVO) and Fortum Power and Heat Oy (Fortum) was carried out by the Technical Research Centre (VIT) on an assignment from STUK. The study aimed at providing a broad overview of the whole organisational framework to support event investigation practices at the regulatory body and at the utilities. The study was part of the IAEA Co-ordinated Research Programme (CRP) on 'Investigation of Methodologies for Incident Analysis'. The main objective of the research was to evaluate the adequacy and reliability of event investigation analysis methods and practices in the Finnish nuclear power industry and based on the results to further develop them. In general, the direct causes of identified events could be detected and eliminated, but more emphasis should be given to the prevention of recurrence of events and identification of common causes and latent failures. The study showed that the evaluated organisations had rather comprehensive incident analysis arrangements. The study also showed that more focus and prioritisation are needed. Deficiencies were identified mostly in the areas of recording, assessment and classification of new events, use of existing operating experience data, utilisation of information technology tools, and allocation of work and resources. Also the indicators or measures for the effectiveness of event investigation and operating experience feedback were missing. All organisations should maintain adequate resources in this area. The researchers suggested a more effective operating experience feedback loop. Especially more attention should be paid to root cause analysis of significant events, tasks and activities where the initial errors have occurred, and weaknesses of defensive barriers. It was also recommended that implementing periodic operational experience

  9. The International Nuclear Event Scale (INES) user's manual. 2001 edition

    International Nuclear Information System (INIS)

    2001-12-01

    The International Nuclear Event Scale (INES) was introduced in March 1990 jointly by the International Atomic Energy Agency (IAEA) and the Nuclear Energy Agency of the Organisation for Economic Co-operation and Development (OECD/NEA). Its primary purpose is to facilitate communication and understanding between the nuclear community, the media and the public on the safety significance of events occurring at nuclear installations. The scale was refined in 1992 in the light of experience gained and extended to be applicable to any event associated with radioactive material and/or radiation, including the transport of radioactive materials.This edition of the INES User's Manual incorporates experience gained from applying the 1992 version of the scale and the document entitled 'Clarification of Issues Raised'. As such, it replaces those earlier publications. It does not amend the technical basis of the INES rating procedure but is expected to facilitate the task of those who are required to rate the safety significance of events using the INES scale. The INES communication network currently receives and disseminates event information to the INES National Officers of 60 Member States on special Event Rating Forms which represent official information on the events, including the rating. The INES communication process has led each participating country to set up an internal network which ensures that all events are promptly communicated and rated whenever they have to be reported outside or inside the country. The IAEA provides training services on the use of INES on request

  10. The International Nuclear Event Scale (INES) user's manual. 2001 edition

    International Nuclear Information System (INIS)

    2001-02-01

    The International Nuclear Event Scale (INES) was introduced in March 1990 jointly by the International Atomic Energy Agency (IAEA) and the Nuclear Energy Agency of the Organisation for Economic Co-operation and Development (OECD/NEA). Its primary purpose is to facilitate communication and understanding between the nuclear community, the media and the public on the safety significance of events occurring at nuclear installations. The scale was refined in 1992 in the light of experience gained and extended to be applicable to any event associated with radioactive material and/or radiation, including the transport of radioactive materials.This edition of the INES User's Manual incorporates experience gained from applying the 1992 version of the scale and the document entitled ''Clarification of Issues Raised''. As such, it replaces those earlier publications. It does not amend the technical basis of the INES rating procedure but is expected to facilitate the task of those who are required to rate the safety significance of events using the INES scale. The INES communication network currently receives and disseminates event information to the INES National Officers of 60 Member States on special Event Rating Forms which represent official information on the events, including the rating. The INES communication process has led each participating country to set up an internal network which ensures that all events are promptly communicated and rated whenever they have to be reported outside or inside the country. The IAEA provides training services on the use of INES on request

  11. Vagal tone during infant contingency learning and its disruption.

    Science.gov (United States)

    Sullivan, Margaret Wolan

    2016-04-01

    This study used contingency learning to examine changes in infants' vagal tone during learning and its disruption. The heart rate of 160 five-month-old infants was recorded continuously during the first of two training sessions as they experienced an audiovisual event contingent on their pulling. Maternal reports of infant temperament were also collected. Baseline vagal tone, a measure of parasympathetic regulation of the heart, was related to vagal levels during the infants' contingency learning session, but not to their learner status. Vagal tone levels did not vary significantly over session minutes. Instead, vagal tone levels were a function of both individual differences in learner status and infant soothability. Vagal levels of infants who learned in the initial session were similar regardless of their soothability; however, vagal levels of infants who learned in a subsequent session differed as a function of soothability. Additionally, vagal levels during contingency disruption were significantly higher among infants in this group who were more soothable as opposed to those who were less soothable. The results suggest that contingency learning and disruption is associated with stable vagal tone in the majority of infants, but that individual differences in attention processes and state associated with vagal tone may be most readily observed during the disruption phase. © 2015 Wiley Periodicals, Inc.

  12. Communicating about nuclear events: Some suggestions to improve INES

    International Nuclear Information System (INIS)

    Kermisch, Céline; Labeau, Pierre-Etienne

    2013-01-01

    This paper provides a critical analysis of the International Nuclear and Radiological Event Scale (INES) and its use, both from an epistemic and an ethical perspective. As very few papers have been dedicated to this subject, our critical analysis is mainly based on the INES 2009 User's Manual and on technical information issued by different nuclear agencies. Our critical analysis leads to suggest several elements, which could contribute to the improvement of the INES scale and thereby to a better communication about nuclear events. First, we show that multiple criteria are used to assign an INES rating, which could lead to an insufficient differentiation between events. In order to avoid this issue, we suggest to clarify the criteria that are used to assess the level of the event. Then, we show that level 7 of the INES scale is ill-defined as it does not allow to properly take differences in severity between disasters into account. In this regard, we recommend to use an open scale instead. Moreover, we highlight the fact that INES is able to take into account neither events with long-term evolution nor events involving multiple initiators. In this respect, we suggest providing additional guidelines and reflecting about the data on which to rely, in order to assess an INES level. Furthermore, we reflect on who should be rating a nuclear event and we recommend that, for severe events, an independent and plural agency should be in charge. Finally, we show why INES appears to be insufficient for a global communication, and we suggest to complement the INES rating with additional information in parallel. -- Highlights: •We provide a critical analysis of the INES scale and suggestions to improve it. •The rating criteria should be clarified to allow differentiation between events. •An open scale should be used to differentiate between level-7 accidents. •Additional guidelines should be provided for complex and evolving events. •We provide suggestions to satisfy

  13. A comparator-hypothesis account of biased contingency detection.

    Science.gov (United States)

    Vadillo, Miguel A; Barberia, Itxaso

    2018-02-12

    Our ability to detect statistical dependencies between different events in the environment is strongly biased by the number of coincidences between them. Even when there is no true covariation between a cue and an outcome, if the marginal probability of either of them is high, people tend to perceive some degree of statistical contingency between both events. The present paper explores the ability of the Comparator Hypothesis to explain the general pattern of results observed in this literature. Our simulations show that this model can account for the biasing effects of the marginal probabilities of cues and outcomes. Furthermore, the overall fit of the Comparator Hypothesis to a sample of experimental conditions from previous studies is comparable to that of the popular Rescorla-Wagner model. These results should encourage researchers to further explore and put to the test the predictions of the Comparator Hypothesis in the domain of biased contingency detection. Copyright © 2018 Elsevier B.V. All rights reserved.

  14. Describing The Water Contingency Plan During Water Crisis in Malaysian Nuclear Agency

    International Nuclear Information System (INIS)

    Mohamad Suhaimi Yahaya; Alwi Othman; Abdul Murad Abu Bakar; Abdul Rahman Norazumin; Nazri Talib

    2015-01-01

    The status of buildings, infrastructures and radiation plants in Nuclear Malaysia are in good condition in term of water supplies. Unfortunately with the numbers of water crisis occurs recently due to shortage of treated water from SYABAS especially during hot weather had caused low water pressure and also water rationing in Selangor and Klang Valley. This event would affect the component of fire protection system and cooling system in buildings, infrastructures, reactor facility and radiation plants in Nuclear Malaysia. (author)

  15. Optimistic bias and pessimistic realism in judgments of contingency with aversive or rewarding outcomes.

    Science.gov (United States)

    Sonoda, Akihito

    2002-10-01

    A depressive personality influences judgments of contingency. This is called "depressive realism." The present experiment examined whether optimistic traits, as measured by various scales, are correlated with judgments of contingency. The valences of the target stimuli were aversive or rewarding (noise avoidance or gaining points). Analysis indicated that the optimistic subjects (as measured by explanatory style for negative events) tend to overestimate noncontingent events; however, optimism measured by other scales did not show such an effect. The findings are discussed in terms of a self-defensive attributional bias.

  16. Rethinking Reinforcement: Allocation, Induction, and Contingency

    Science.gov (United States)

    Baum, William M

    2012-01-01

    The concept of reinforcement is at least incomplete and almost certainly incorrect. An alternative way of organizing our understanding of behavior may be built around three concepts: allocation, induction, and correlation. Allocation is the measure of behavior and captures the centrality of choice: All behavior entails choice and consists of choice. Allocation changes as a result of induction and correlation. The term induction covers phenomena such as adjunctive, interim, and terminal behavior—behavior induced in a situation by occurrence of food or another Phylogenetically Important Event (PIE) in that situation. Induction resembles stimulus control in that no one-to-one relation exists between induced behavior and the inducing event. If one allowed that some stimulus control were the result of phylogeny, then induction and stimulus control would be identical, and a PIE would resemble a discriminative stimulus. Much evidence supports the idea that a PIE induces all PIE-related activities. Research also supports the idea that stimuli correlated with PIEs become PIE-related conditional inducers. Contingencies create correlations between “operant” activity (e.g., lever pressing) and PIEs (e.g., food). Once an activity has become PIE-related, the PIE induces it along with other PIE-related activities. Contingencies also constrain possible performances. These constraints specify feedback functions, which explain phenomena such as the higher response rates on ratio schedules in comparison with interval schedules. Allocations that include a lot of operant activity are “selected” only in the sense that they generate more frequent occurrence of the PIE within the constraints of the situation; contingency and induction do the “selecting.” PMID:22287807

  17. Initiating Event Rates at U.S. Nuclear Power Plants. 1988 - 2013

    International Nuclear Information System (INIS)

    Schroeder, John A.; Bower, Gordon R.

    2014-01-01

    Analyzing initiating event rates is important because it indicates performance among plants and also provides inputs to several U.S. Nuclear Regulatory Commission (NRC) risk-informed regulatory activities. This report presents an analysis of initiating event frequencies at U.S. commercial nuclear power plants since each plant's low-power license date. The evaluation is based on the operating experience from fiscal year 1988 through 2013 as reported in licensee event reports. Engineers with nuclear power plant experience staff reviewed each event report since the last update to this report for the presence of valid scrams or reactor trips at power. To be included in the study, an event had to meet all of the following criteria: includes an unplanned reactor trip (not a scheduled reactor trip on the daily operations schedule), sequence of events starts when reactor is critical and at or above the point of adding heat, occurs at a U.S. commercial nuclear power plant (excluding Fort St. Vrain and LaCrosse), and is reported by a licensee event report. This report displays occurrence rates (baseline frequencies) for the categories of initiating events that contribute to the NRC's Industry Trends Program. Sixteen initiating event groupings are trended and displayed. Initiators are plotted separately for initiating events with different occurrence rates for boiling water reactors and pressurized water reactors. p-values are given for the possible presence of a trend over the most recent 10 years.

  18. Nuclear target foil fabrication for the Romano Event

    International Nuclear Information System (INIS)

    Weed, J.W.; Romo, J.G. Jr.; Griggs, G.E.

    1984-01-01

    The Vacuum Processes Lab, of LLNL's M.E. Dept. - Material Fabrication Division, was requested to provide 250 coated Parylene target foils for a nuclear physics experiment titled the ROMANO Event. Due to the developmental nature of some of the fabrication procedures, approximately 400 coated foils were produced to satisfy the event's needs. The foils were used in the experiment as subkilovolt x-ray, narrow band pass filters, and wide band ultraviolet filters. This paper is divided into three sections describing: (1) nuclear target foil fabrication, (2) Parylene substrate preparation and production, and (3) foil and substrate inspections

  19. Social contingencies, the aged, and public policy.

    Science.gov (United States)

    Hudson, R B

    1993-01-01

    Today's older population is notably different than it was a few decades ago, both in well-being and in diversity, a shift that must be acknowledged in public policy. The U.S. social insurance system overprotects against highly likely, predictable, and nonvolatile events at the expense of more unlikely, potentially catastrophic, and less volatile events. The public sector, therefore, should move toward proportionally emphasizing health-related, functionally impairing events rather than income maintenance; the private sector is better suited to insuring against predictable and nonvolatile old-age events. A contingent event scheme would: (a) encourage the growth of long-term-care insurance; (b) help bridge the gap between those arguing for greater "efficiencies" in social welfare spending and those pressing for new universal benefits; and (c) bring a new perspective to the "generational equity" debate.

  20. Hydrologic effects of natural disruptive events on nuclear repositories

    International Nuclear Information System (INIS)

    Davis, S.N.

    1979-01-01

    This report describes some possible hydrogeologic effects of disruptive events which may affect repositories for nuclear waste. The report concentrates on the effects of natural events which are judged to be most probable

  1. I spy with my little eye - the detection of intentional contingency in early psychosis.

    Science.gov (United States)

    Fett, Anne-Kathrin J; González Berdugo, Clara Isabel; Hanssen, Esther; Lemmers-Jansen, Imke; Shergill, Sukhi S; Krabbendam, Lydia

    2015-01-01

    Paranoid delusions have been associated with a tendency to over-attribute intentionality and contingency to others' actions and incidental events in individuals with chronic psychosis. However, this hyper-associative perception bias has not been investigated in the early illness stages of psychosis, during which it may play a particularly crucial role in the formation of symptoms. We used an experimental paradigm with 20 short film clips of simple animate and inanimate shapes that either moved in a contingent or non-contingent manner to investigate the perception of contingency in 38 adolescents with early psychosis and 93 healthy control adolescents. Participants rated the contingency between the shapes' movements on a scale from 0 to 10. The data were analysed with multilevel regression analyses to account for repeated measures within subjects. There were no significant differences between patients and controls; both perceived the contingency of the shapes' movements similarly across all conditions and patients' contingency perception was unrelated to their levels of paranoid delusions. Contingency perception was unimpaired in patients with early psychosis, suggesting that it might still be intact in the early illness stages. Future studies should set out to determine whether the early illness stages could offer a window for interventions that counteract the development of hyper-associative perceptions of contingency.

  2. A Contingency-Oriented Approach to Understanding Borderline Personality Disorder: Situational Triggers and Symptoms

    Science.gov (United States)

    Miskewicz, Kelly; Fleeson, William; Arnold, Elizabeth Mayfield; Law, Mary Kate; Mneimne, Malek; Furr, R. Michael

    2015-01-01

    This article tested a contingency-oriented perspective to examine the dynamic relationships between in-the-moment borderline personality disorder (BPD) symptom events and in-the-moment triggers. An experience sampling study with 282 adults, including 77 participants with BPD, obtained reports of situational triggers and BPD symptom events five times daily for two weeks. Triggers included being rejected, betrayed, abandoned, offended, disappointed, having one’s self-concept threatened, being in a boring situation, and being alone. BPD was associated with increased situational triggers. Multilevel models revealed significant within-person associations between situational triggers and BPD symptoms for the average participant in the study, with significant individual variance in the strength and direction of trigger-symptom contingencies. Most trigger-symptom contingencies were stronger for individuals with higher borderline symptomatology, suggesting that triggers are meaningfully related to BPD. These findings highlight possible proximal mechanisms that maintain BPD and help explain the course of a disorder often described as chaotic and unpredictable. PMID:26200848

  3. Rats distinguish between absence of events and lack of evidence in contingency learning.

    Science.gov (United States)

    Waldmann, Michael R; Schmid, Martina; Wong, Jared; Blaisdell, Aaron P

    2012-09-01

    The goal of three experiments was to study whether rats are aware of the difference between absence of events and lack of evidence. We used a Pavlovian extinction paradigm in which lights consistently signaling sucrose were suddenly paired with the absence of sucrose. The crucial manipulation involved the absent outcomes in the extinction phase. Whereas in the Cover conditions, access to the drinking receptacle was blocked by a metal plate, in the No Cover conditions, the drinking receptacle was accessible. The Test phase showed that in the Cover conditions, the measured expectancies of sucrose were clearly at a higher level than in the No Cover conditions. We compare two competing theories potentially explaining the findings. A cognitive theory interprets the observed effect as evidence that the rats were able to understand that the cover blocked informational access to the outcome information, and therefore the changed learning input did not necessarily signify a change of the underlying contingency in the world. An alternative associationist account, renewal theory, might instead explain the relative sparing of extinction in the Cover condition as a consequence of context change. We discuss the merits of both theories as accounts of our data and conclude that the cognitive explanation is in this case preferred.

  4. Hanford Facility contingency plan

    International Nuclear Information System (INIS)

    Sutton, L.N.; Miskho, A.G.; Brunke, R.C.

    1993-10-01

    The Hanford Facility Contingency Plan, together with each TSD unit-specific contingency plan, meets the WAC 173-303 requirements for a contingency plan. This plan includes descriptions of responses to a nonradiological hazardous materials spill or release at Hanford Facility locations not covered by TSD unit-specific contingency plans or building emergency plans. This plan includes descriptions of responses for spills or releases as a result of transportation activities, movement of materials, packaging, and storage of hazardous materials

  5. Trend analysis of breaker events at United States nuclear power plants

    International Nuclear Information System (INIS)

    Shimada, Hiroki

    2006-01-01

    From events in overseas nuclear power plants recorded in the nuclear information detabase of Institute of Nuclear Safety System, Inc. (INSS), the number of events of electrical systems during the four years from 2002 to 2005 was extracted and the trend was analyzed. The results showed that breaker events were the largest in number in all years, and almost all them occurred in the US. The breaker events that occurred in US nuclear power plants in 2005 were analyzed by classifying them by cause of failure and effect on the plant, and by comparing the number of occurrences with that in Japan. As a result, the main cause of many of the breaker events was improper maintenance due to poor arrangement of maintenance manuals and human error, as well as aging degradation, they can be estimated to have been caused by insufficient maintenance control and inspection. The number of breaker failures per plant per year in our country was lower than that in the US by an order of magnitude, and there were no failures that led to a plant trip or power reduction. These facts suggest that our country's maintenance contents of breaker are advantage. (author)

  6. Fuzzy-set based contingency ranking

    International Nuclear Information System (INIS)

    Hsu, Y.Y.; Kuo, H.C.

    1992-01-01

    In this paper, a new approach based on fuzzy set theory is developed for contingency ranking of Taiwan power system. To examine whether a power system can remain in a secure and reliable operating state under contingency conditions, those contingency cases that will result in loss-of-load, loss-of generation, or islanding are first identified. Then 1P-1Q iteration of fast decoupled load flow is preformed to estimate post-contingent quantities (line flows, bus voltages) for other contingency cases. Based on system operators' past experience, each post-contingent quantity is assigned a degree of severity according to the potential damage that could be imposed on the power system by the quantity, should the contingency occurs. An approach based on fuzzy set theory is developed to deal with the imprecision of linguistic terms

  7. Tidal Disruption Events from Eccentric Nuclear Disks

    Science.gov (United States)

    Wernke, Heather N.; Madigan, Ann-Marie

    2018-04-01

    Stars that get too close to a supermassive black hole are in danger of being tidally disrupted. Stellar two-body relaxation is commonly assumed to be the main driver of these events. Recent work has shown, however, that secular gravitational torques from eccentric nuclear disks can push stars to extreme eccentricities at much higher rates than predicted by two-body relaxation. This work did not include the effects of general relativity, however, which could quench secular torques via rapid apsidal precession. Here we show that, for a star in danger of disruption, general relativity acts on a timescale of less than an orbital period. This short timescale means that general relativity does not have enough time to have a major effect on the orbit. When driven by secular torques from eccentric nuclear disks, tidal disruption event rates are not affected by general relativity.

  8. Indemnification of damage in the event of a nuclear accident

    International Nuclear Information System (INIS)

    2003-01-01

    The Workshop on the Indemnification of Damage in the Event of a Nuclear Accident, organised by the OECD Nuclear Energy Agency in close co-operation with the French authorities, was held in Paris from 26 to 28 November 2001. This event was an integral part of the International Nuclear Emergency Exercise INEX 2000. It attracted wide participation from national nuclear authorities, regulators, operators of nuclear installations, nuclear insurers and international organisations. The objective was to test the capacity of the existing nuclear liability and compensation mechanisms in the 29 countries represented at the workshop to manage the consequences of a nuclear emergency. This workshop was based upon the scenario used for the INEX 2000 Exercise, i.e. an accident simulated at the Gravelines nuclear power plant in the north of France in May 2001. These proceedings contain a comparative analysis of legislative and regulatory provisions governing emergency response and nuclear third party liability, based upon country replies to a questionnaire. This publication also includes the full responses provided to that questionnaire, as well as the texts of presentations made by special guests from Germany and Japan describing the manner in which the public authorities in their respective countries responded to two nuclear accidents of a very different nature and scale. (authors)

  9. Flood control construction of Shidao Bay nuclear power plant and safety analysis for hypothetical accident of HTR-PM

    International Nuclear Information System (INIS)

    Chen Yongrong; Zhang Keke; Zhu Li

    2014-01-01

    A series of events triggered by tsunami eventually led to the Fukushima nuclear accident. For drawing lessons from the nuclear accident and applying to Shidao Bay nuclear power plant flood control construction, we compare with the state laws and regulations, and prove the design of Shidao Bay nuclear power plant flood construction. Through introducing the history of domestic tsunamis and the national researches before and after the Fukushima nuclear accident, we expound the tsunami hazards of Shidao Bay nuclear power plant. In addition, in order to verify the safety of HTR-PM, we anticipate the contingent accidents after ''superposition event of earthquake and extreme flood'', and analyse the abilities and measures of HTR-PM to deal with these beyond design basis accidents (BDBA). (author)

  10. Learning, awareness, and instruction: subjective contingency awareness does matter in the colour-word contingency learning paradigm.

    Science.gov (United States)

    Schmidt, James R; De Houwer, Jan

    2012-12-01

    In three experiments, each of a set colour-unrelated distracting words was presented most often in a particular target print colour (e.g., "month" most often in red). In Experiment 1, half of the participants were told the word-colour contingencies in advance (instructed) and half were not (control). The instructed group showed a larger learning effect. This instruction effect was fully explained by increases in subjective awareness with instruction. In Experiment 2, contingency instructions were again given, but no contingencies were actually present. Although many participants claimed to be aware of these (non-existent) contingencies, they did not produce an instructed contingency effect. In Experiment 3, half of the participants were given contingency instructions that did not correspond to the correct contingencies. Participants with these false instructions learned the actual contingencies worse than controls. Collectively, our results suggest that conscious contingency knowledge might play a moderating role in the strength of implicit learning. Copyright © 2012 Elsevier Inc. All rights reserved.

  11. History of Fire Events in the U.S. Commercial Nuclear Industry

    International Nuclear Information System (INIS)

    Bijan Najafi; Joglar-Biloch, Francisco; Kassawara, Robert P.; Khalil, Yehia

    2002-01-01

    Over the past decade, interest in performance-based fire protection has increased within the nuclear industry. In support of this growing interest, in 1997 the Electric Power Research Institute (EPRI) developed a long-range plan to develop/improve data and tools needed to support Risk-Informed/Performance-Based fire protection. This plan calls for continued improvement in collection and use of information obtained from fire events at nuclear plants. The data collection process has the objectives of improving the insights gained from such data and reducing the uncertainty in fire risk and fire modeling methods in order to make them a more reliable basis for performance based fire protection programs. In keeping with these objectives, EPRI continues to collect, review and analyze fire events in support of the nuclear industry. EPRI collects these records in cooperation with the Nuclear Electric Insurance Limited (NEIL), by compiling public fire event reports and by direct solicitation of U.S. nuclear facilities. EPRI fire data collection project is based on the principle that the understanding of history is one of the cornerstones of improving fire protection technology and practice. Therefore, the goal has been to develop and maintain a comprehensive database of fire events with flexibility to support various aspects of fire protection engineering. With more than 1850 fire records over a period of three decades and 2400 reactor years, this is the most comprehensive database of nuclear power industry fire events in existence today. In general, the frequency of fires in the U.S. commercial nuclear industry remains constant. In few cases, e.g., transient fires and fires in BWR offgas/recombiner systems, where either increasing or decreasing trends are observed, these trends tend to slow after 1980. The key issues in improving quality of the data remain to be consistency of the recording and reporting of fire events and difficulties in collection of records. EPRI has

  12. INES: The International Nuclear and Radiological Event Scale User's Manual. 2008 Edition

    International Nuclear Information System (INIS)

    2009-05-01

    The International Nuclear and Radiological Event Scale is used for promptly and consistently communicating to the public the safety significance of events associated with sources of radiation. It covers a wide spectrum of practices, including industrial use such as radiography, use of radiation sources in hospitals, activities at nuclear facilities, and the transport of radioactive material. By putting events from all these practices into a proper perspective, use of INES can facilitate a common understanding between the technical community, the media and the public. The scale was developed in 1990 by international experts convened by the IAEA and the OECD Nuclear Energy Agency (OECD/NEA). It originally reflected the experience gained from the use of similar scales in France and Japan as well as consideration of possible scales in several countries. Since then, the IAEA has managed its development in cooperation with the OECD/NEA and with the support of more than 60 designated National Officers who officially represent the INES member States in the biennial technical meeting of INES. Initially the scale was applied to classify events at nuclear power plants, and then was extended and adapted to enable it to be applied to all installations associated with the civil nuclear industry. More recently, it has been extended and adapted further to meet the growing need for communication of the significance of all events associated with the transport, storage and use of radioactive material and radiation sources. This revised manual brings together the guidance for all uses into a single document. Events are classified on the scale at seven levels: Levels 4-7 are termed 'accidents' and Levels 1-3 'incidents'. Events without safety significance are classified as 'Below Scale/Level 0'. Events that have no safety relevance with respect to radiation or nuclear safety are not classified on the scale. For communication of events to the public, a distinct phrase has been

  13. Analysis of water hammer events in nuclear power plants

    International Nuclear Information System (INIS)

    Sato, Masahiro; Yanagi, Chihiro

    1999-01-01

    A water hammer issue in nuclear power plants was one of unresolved safety issues listed by the United States Nuclear Regulatory Commission and was regarded as resolved. But later on, the water hammer events are still experienced intermittently, while the number of the events is decreasing. We collected water hammer events of PWRs in Japan and the United States and relevant documents, analyzed them, and studied corrective actions taken by Japanese plants. As a result, it is confirmed that preventive measured in design, operation etc. have been already taken and that mitigation mechanisms against water hammer have also been considered. However, it is clarified that attention should be continuously paid to operation of valves and/or pumps, as the prevention of water hammer still relies on operation. (author)

  14. Analysis of adverse events occurred at overseas nuclear power plants in 2003

    International Nuclear Information System (INIS)

    Miyazaki, Takamasa; Sato, Masahiro; Takagawa, Kenichi; Fushimi, Yasuyuki; Shimada, Hiroki; Shimada, Yoshio

    2004-01-01

    The adverse events that have occurred in the overseas nuclear power plants can be studied to provide an indication of how to improve the safety and the reliability of nuclear power plants in Japan. The Institute of Nuclear Safety Systems (INSS) obtains information related to overseas adverse events and incidents, and by evaluating them proposes improvements to prevent similar occurrences in Japanese PWR plants. In 2003, INSS obtained approximately 2800 pieces of information and, by evaluating them, proposed nine recommendations to Japanese utilities. This report shows a summary of the evaluation activity and of the tendency analysis based on individual event analyzed in 2003. The tendency analysis was undertaken on about 1600 analyzed events, from the view point of Mechanics, Electrics, Instruments and Controls and Operations, about the causes, countermeasures, troubled equipments and the possible of lessons learnt from overseas events. This report is to show the whole tendency of overseas events and incidents for the improvement of the safety and reliability of domestic PWR plants. (author)

  15. Compilation of INES (International Nuclear Event Scale) information. Japanese translation (Vol.2)

    Energy Technology Data Exchange (ETDEWEB)

    Watanabe, Norio [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    2001-03-01

    The International Nuclear Event Scale (INES) is a means designed for providing prompt, clear and consistent information related to nuclear events, that occurred at nuclear power plants and at other nuclear facilities, and facilitating communication between the nuclear community, the media and the public on such events. The INES is jointly operated by the International Atomic Energy Agency (IAEA) and the Nuclear Energy Agency of the Organization for Economic Co-operation and Development (OECD/NEA). Nuclear events reported to the INES Information System from member countries of IAEA and/or OECD/NEA are rated by the 'Scale', a consistent safety significance indicator. The scale runs from level 0, for events with no safety significance, to level 7 for a major accident with widespread health and environmental effects. The INES was introduced in March 1990 for a trial and then formally adopted in March 1992. In Japan, the INES was formally introduced in August 1992. The Japan Atomic Energy Research Institute (JAERI) has been receiving the INES information through the Science and Technology Agency, promptly translating into Japanese and providing to the relevant sections inside and outside JAERI. As well, we published the report compiling the Japanese translation of individual INES reports until May 31, 1998. Since then, we have developed a world-wide-web database for the Japanese translation and made it available to the public through the internet. This report compiles the Japanese version of approximately 70 INES reports we received from June 1, 1998 to December 31, 2000. (author)

  16. Human based roots of failures in nuclear events investigations

    Energy Technology Data Exchange (ETDEWEB)

    Ziedelis, Stanislovas; Noel, Marc; Strucic, Miodrag [Commission of the European Communities, Petten (Netherlands). European Clearinghouse on Operational Experience Feedback for Nuclear Power Plants

    2012-10-15

    This paper aims for improvement of quality of the event investigations in the nuclear industry through analysis of the existing practices, identifying and removing the existing Human and Organizational Factors (HOF) and management related barriers. It presents the essential results of several studies performed by the European Clearinghouse on Operational Experience. Outcomes of studies are based on survey of currently existing event investigation practices typical for nuclear industry of 12 European countries, as well as on insights from analysis of numerous event investigation reports. System of operational experience feedback from information based on event investigation results is not enough effective to prevent and even to decrease frequency of recurring events due to existing methodological, HOF-related and/or knowledge management related constraints. Besides that, several latent root causes of unsuccessful event investigation are related to weaknesses in safety culture of personnel and managers. These weaknesses include focus on costs or schedule, political manipulation, arrogance, ignorance, entitlement and/or autocracy. Upgrades in safety culture of organization's personnel and its senior management especially seem to be an effective way to improvement. Increasing of competencies, capabilities and level of independency of event investigation teams, elaboration of comprehensive software, ensuring of positive approach, adequate support and impartiality of management could also facilitate for improvement of quality of the event investigations. (orig.)

  17. Human based roots of failures in nuclear events investigations

    International Nuclear Information System (INIS)

    Ziedelis, Stanislovas; Noel, Marc; Strucic, Miodrag

    2012-01-01

    This paper aims for improvement of quality of the event investigations in the nuclear industry through analysis of the existing practices, identifying and removing the existing Human and Organizational Factors (HOF) and management related barriers. It presents the essential results of several studies performed by the European Clearinghouse on Operational Experience. Outcomes of studies are based on survey of currently existing event investigation practices typical for nuclear industry of 12 European countries, as well as on insights from analysis of numerous event investigation reports. System of operational experience feedback from information based on event investigation results is not enough effective to prevent and even to decrease frequency of recurring events due to existing methodological, HOF-related and/or knowledge management related constraints. Besides that, several latent root causes of unsuccessful event investigation are related to weaknesses in safety culture of personnel and managers. These weaknesses include focus on costs or schedule, political manipulation, arrogance, ignorance, entitlement and/or autocracy. Upgrades in safety culture of organization's personnel and its senior management especially seem to be an effective way to improvement. Increasing of competencies, capabilities and level of independency of event investigation teams, elaboration of comprehensive software, ensuring of positive approach, adequate support and impartiality of management could also facilitate for improvement of quality of the event investigations. (orig.)

  18. Attenuation of the contingency detection effect in the extrastriate body area in autism spectrum disorder.

    Science.gov (United States)

    Okamoto, Yuko; Kitada, Ryo; Tanabe, Hiroki C; Hayashi, Masamichi J; Kochiyama, Takanori; Munesue, Toshio; Ishitobi, Makoto; Saito, Daisuke N; Yanaka, Hisakazu T; Omori, Masao; Wada, Yuji; Okazawa, Hidehiko; Sasaki, Akihiro T; Morita, Tomoyo; Itakura, Shoji; Kosaka, Hirotaka; Sadato, Norihiro

    2014-10-01

    Detection of the contingency between one's own behavior and consequent social events is important for normal social development, and impaired contingency detection may be a cause of autism spectrum disorder (ASD). To depict the neural underpinnings of this contingency effect, 19 adults with ASD and 22 control participants underwent functional MRI while imitating another's actions and their actions being imitated by the other. As the extrastriate body area (EBA) receives efference copies of one's own movements, we predicted that the EBA would show an atypical response during contingency detection in ASD. We manipulated two factors: the congruency of the executed and observed actions, and the order of action execution and observation. Both groups showed the congruency effect in the bilateral EBA during imitation. When action preceded observation, the left EBA of the control group showed the congruency effect, representing the response to being imitated, indicating contingency detection. The ASD group showed a reduced contingency effect in the left EBA. These results indicate that the function of the EBA in the contingency detection is altered in ASD. Copyright © 2014 Elsevier Ireland Ltd and the Japan Neuroscience Society. All rights reserved.

  19. Graded Approach to the Development of a Contingency Plan for On-Line Maintenance

    International Nuclear Information System (INIS)

    Chang, Hee Seung; Kim, Jung Wun; Song, Tae Young

    2012-01-01

    Many utilities perform preventive maintenance for safety systems during power operation to improve equipment reliability so as to focus on the work activities more easily and improve the quality of maintenance. Such a strategy can also reduce outage work activities, thus allowing resources to be utilized effectively. Preventive maintenance during power operation, known as on-line maintenance (OLM), requires an assessment and mitigation of risk, which can increase owing to out-of-service safety systems. One of the mitigation action plans is a contingency plan. EPRI recommends the development of a contingency plan for all planned system outages which include factors that strongly affect safety. The Korea Hydro and Nuclear Power Company (KHNP) undertook the preventive maintenance of the Essential Chilled Water System (ECWS) of a Westinghouse plant as a pilot OLM implementation. During the preparation of the work activities, a contingency plan was a pertinent issue during the discussions with regulators, especially regarding the scope and depth of the plan. This paper discusses the purpose of a contingency plan, including as examples some cases of US utilities, and proposes a graded approach to develop a contingency plan for OLM in consideration of the risks

  20. Extreme meteorological events and nuclear facilities safety; Fenomenos meteorologicos extremos e a seguranca das instalacoes nucleares

    Energy Technology Data Exchange (ETDEWEB)

    Almeida, Patricia Moco Princisval

    2006-07-01

    An External Event is an event that originates outside the site and whose effects on the Nuclear Power Plants (NPP) should be considered. Such events could be of natural or human induced origin and should be identified and selected for design purposes during the site evaluation process. This work shows that the subtropics and mid latitudes of South America east of the Andes Mountain Range have been recognized as prone to severe convective weather. In Brazil, the events of tornadoes are becoming frequent; however there is no institutionalized procedure for a systematic documentation of severe weather. The information is done only for some scientists and by the newspapers. Like strong wind can affect the structural integrity of buildings or the pressure differential can affect the ventilation system, our concern is the safety of NPP and for this purpose the recommendations of International Atomic Energy Agency, Nuclear Regulatory Commission and Comissao Nacional de Energia Nuclear are showed and also a data base of tornadoes in Brazil is done. (author)

  1. Why are parasite contingency genes often associated with telomeres?

    Science.gov (United States)

    Barry, J D; Ginger, M L; Burton, P; McCulloch, R

    2003-01-01

    Contingency genes are common in pathogenic microbes and enable, through pre-emptive mutational events, rapid, clonal switches in phenotype that are conducive to survival and proliferation in hosts. Antigenic variation, which is a highly successful survival strategy employed by eubacterial and eukaryotic pathogens, involves large repertoires of distinct contingency genes that are expressed differentially, enabling evasion of host acquired immunity. Most, but not all, antigenic variation systems make extensive use of subtelomeres. Study of model systems has shown that subtelomeres have unusual properties, including reversible silencing of genes mediated by proteins binding to the telomere, and engagement in ectopic recombination with other subtelomeres. There is a general theory that subtelomeric location confers a capacity for gene diversification through such recombination, although experimental evidence is that there is no increased mitotic recombination at such loci and that sequence homogenisation occurs. Possible benefits of subtelomeric location for pathogen contingency systems are reversible gene silencing, which could contribute to systems for gene switching and mutually exclusive expression, and ectopic recombination, leading to gene family diversification. We examine, in several antigenic variation systems, what possible benefits apply.

  2. Waste Management Project Contingency Analysis

    International Nuclear Information System (INIS)

    Edward L. Parsons, Jr.

    1999-01-01

    The purpose of this report is to provide the office of Waste Management (WM) with recommended contingency calculation procedures for typical WM projects. Typical projects were defined as conventional construction-type activities that use innovative elements when necessary to meet the project objectives. Projects involve treatment, storage, and disposal of low level, mixed low level, hazardous, transuranic, and high level waste. Cost contingencies are an essential part of Total Cost Management. A contingency is an amount added to a cost estimate to compensate for unexpected expenses resulting from incomplete design, unforeseen and unpredictable conditions, or uncertainties in the project scope (DOE 1994, AACE 1998). Contingency allowances are expressed as percentages of estimated cost and improve cost estimates by accounting for uncertainties. The contingency allowance is large at the beginning of a project because there are more uncertainties, but as a project develops, the allowance shrinks to adjust for costs already incurred. Ideally, the total estimated cost remains the same throughout a project. Project contingency reflects the degree of uncertainty caused by lack of project definition, and process contingency reflects the degree of uncertainty caused by use of new technology. Different cost estimation methods were reviewed and compared with respect to terminology, accuracy, and Cost Guide standards. The Association for the Advancement of Cost Engineering (AACE) methods for cost estimation were selected to represent best industry practice. AACE methodology for contingency analysis can be readily applied to WM Projects, accounts for uncertainties associated with different stages of a project, and considers both project and process contingencies and the stage of technical readiness. As recommended, AACE contingency allowances taper off linearly as a project nears completion

  3. Future Contingents

    DEFF Research Database (Denmark)

    Øhrstrøm, Peter; Hasle., Per F. V.

    2015-01-01

    contingent statements. The problem of future contingents is interwoven with a number of issues in theology, philosophy, logic, semantics of natural language, computer science, and applied mathematics. The theological issue of how to reconcile the assumption of God's foreknowledge with the freedom and moral...... accountability of human beings has been a main impetus to the discussion and a major inspiration to the development of various logical models of time and future contingents. This theological issue is connected with the general philosophical question of determinism versus indeterminism. Within logic, the relation...... about the future. Finally, it should be mentioned that temporal logic has found a remarkable application in computer science and applied mathematics. In the late 1970s the first computer scientists realised the relevance of temporal logic for the purposes of computer science (see Hasle and Øhrstrøm 2004)....

  4. Future Contingents

    DEFF Research Database (Denmark)

    Øhrstrøm, Peter; Hasle., Per F. V.

    2011-01-01

    contingent statements. The problem of future contingents is interwoven with a number of issues in theology, philosophy, logic, semantics of natural language, computer science, and applied mathematics. The theological issue of how to reconcile the assumption of God's foreknowledge with the freedom and moral...... accountability of human beings has been a main impetus to the discussion and a major inspiration to the development of various logical models of time and future contingents. This theological issue is connected with the general philosophical question of determinism versus indeterminism. Within logic, the relation...... about the future. Finally, it should be mentioned that temporal logic has found a remarkable application in computer science and applied mathematics. In the late 1970s the first computer scientists realised the relevance of temporal logic for the purposes of computer science (see Hasle and Øhrstrøm 2004)....

  5. Development of synchronous VHL syndrome tumors reveals contingencies and constraints to tumor evolution

    DEFF Research Database (Denmark)

    Fisher, Rosalie; Horswell, Stuart; Rowan, Andrew

    2014-01-01

    are contingent upon the nature of 3p loss of heterozygosity occurring early in tumorigenesis. However, despite distinct 3p events, genomic, proteomic and immunohistochemical analyses reveal evidence for convergence upon the PI3K-AKT-mTOR signaling pathway. Four germline tumors in this young patient...... a germline VHL mutation, the evolutionary principles of contingency and convergence in tumor development are complementary. In this small set of patients with early stage VHL-associated tumors, there is reduced mutation burden and limited evidence of intra-tumor heterogeneity....

  6. 49 CFR 1544.301 - Contingency plan.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 9 2010-10-01 2010-10-01 false Contingency plan. 1544.301 Section 1544.301... COMMERCIAL OPERATORS Threat and Threat Response § 1544.301 Contingency plan. Each aircraft operator must adopt a contingency plan and must: (a) Implement its contingency plan when directed by TSA. (b) Ensure...

  7. Supervisory Styles: A Contingency Framework

    Science.gov (United States)

    Boehe, Dirk Michael

    2016-01-01

    While the contingent nature of doctoral supervision has been acknowledged, the literature on supervisory styles has yet to deliver a theory-based contingency framework. A contingency framework can assist supervisors and research students in identifying appropriate supervisory styles under varying circumstances. The conceptual study reported here…

  8. Significant others and contingencies of self-worth: activation and consequences of relationship-specific contingencies of self-worth.

    Science.gov (United States)

    Horberg, E J; Chen, Serena

    2010-01-01

    Three studies tested the activation and consequences of contingencies of self-worth associated with specific significant others, that is, relationship-specific contingencies of self-worth. The results showed that activating the mental representation of a significant other with whom one strongly desires closeness led participants to stake their self-esteem in domains in which the significant other wanted them to excel. This was shown in terms of self-reported contingencies of self-worth (Study 1), in terms of self-worth after receiving feedback on a successful or unsatisfactory performance in a relationship-specific contingency domain (Study 2), and in terms of feelings of reduced self-worth after thinking about a failure in a relationship-specific contingency domain (Study 3). Across studies, a variety of contingency domains were examined. Furthermore, Study 3 showed that failing in an activated relationship-specific contingency domain had negative implications for current feelings of closeness and acceptance in the significant-other relationship. Overall, the findings suggest that people's contingencies of self-worth depend on the social situation and that performance in relationship-specific contingency domains can influence people's perceptions of their relationships.

  9. 30 CFR 282.26 - Contingency Plan.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Contingency Plan. 282.26 Section 282.26 Mineral... § 282.26 Contingency Plan. (a) When required by the Director, a lessee shall include a Contingency Plan as part of its request for approval of a Delineation, Testing, or Mining Plan. The Contingency Plan...

  10. Analysis of failure events for expansion joints in nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Sato, Masahiro [Institute of Nuclear Safety System Inc., Mihama, Fukui (Japan)

    2001-09-01

    Although a large number of expansion joints are used in nuclear power plants with light water reactors, their failure events have not been paid as much attention as those of vessels and pipes. However, as the operation period of nuclear power plants becomes longer, it is necessary to pay attention to their failure events as well as those of vessels and pipes, because aging problems and latent troubles originated in design or fabrication of expansion joints may appear during their long period operation. In this work, we investigated failure event reports of expansion joints in nuclear power plants both in Japan and in U.S.A. and analyzed (1) the influence to output power level, (2) the position and (3) the cause of each failure. It is revealed that the failure events of expansion joints have continuously occurred, some of which have exerted influence upon power level and have caused fatal or injury accidents of personnel, and hence the importance of corrective actions to prevent the recurrence of such events is pointed out. The importance of countermeasures to the following individual events is also pointed out: (1) corrosion of expansion joints in service water systems, (2) degradation of rubber expansion joints in main condensers, (3) vibration and fatigue of expansion joints in extraction steam lines and (4) transgranular stress corrosion cracking of penetration bellows of containments. (author)

  11. Preliminary Analysis of the Common Cause Failure Events for Domestic Nuclear Power Plants

    International Nuclear Information System (INIS)

    Kang, Daeil; Han, Sanghoon

    2007-01-01

    It is known that the common cause failure (CCF) events have a great effect on the safety and probabilistic safety assessment (PSA) results of nuclear power plants (NPPs). However, the domestic studies have been mainly focused on the analysis method and modeling of CCF events. Thus, the analysis of the CCF events for domestic NPPs were performed to establish a domestic database for the CCF events and to deliver them to the operation office of the international common cause failure data exchange (ICDE) project. This paper presents the analysis results of the CCF events for domestic nuclear power plants

  12. External events analysis of the Ignalina Nuclear Power Plant

    International Nuclear Information System (INIS)

    Liaukonis, Mindaugas; Augutis, Juozas

    1999-01-01

    This paper presents analysis of external events impact on the safe operation of the Ignalina Nuclear Power Plant (INPP) safety systems. Analysis was based on the probabilistic estimation and modelling of the external hazards. The screening criteria were applied to the number of external hazards. The following external events such as aircraft failure on the INPP, external flooding, fire, extreme winds requiring further bounding study were analysed. Mathematical models were developed and event probabilities were calculated. External events analysis showed rather limited external events danger to Ignalina NPP. Results of the analysis were compared to analogous analysis in western NPPs and no great differences were specified. Calculations performed show that external events can not significantly influence the safety level of the Ignalina NPP operation. (author)

  13. Contingent Conspiracies: Art, Philosophy, Science

    DEFF Research Database (Denmark)

    Wilson, Alexander

    2013-01-01

    The question of whether creativity comes from being “open” or “closed” to contingent processes, deeply intersects art-historical discourse on authorship, style, technique and practice: from the Greek notion of the Daimon, through commedia dell'arte’s improvised styles and romanticism’s investment......, Hegel) contain a deeper tension between contingency and necessity, often revealed in correlate discussions of the sublime. But as artists find themselves returning again to a concern or care for contingency (a thread running through Heidegger, Levinas and Derrida) or the question how to conspire...... with contingency (Negarestani), they do so today with a new paradigm of scientific knowledge at their disposal. For science too has increasingly been forced to respond to the notion of contingency. Progressively discovering the ubiquity of non-linear dynamics, deterministic chaos and emergent complexity...

  14. Contingency diagrams as teaching tools

    OpenAIRE

    Mattaini, Mark A.

    1995-01-01

    Contingency diagrams are particularly effective teaching tools, because they provide a means for students to view the complexities of contingency networks present in natural and laboratory settings while displaying the elementary processes that constitute those networks. This paper sketches recent developments in this visualization technology and illustrates approaches for using contingency diagrams in teaching.

  15. Assessment of the nuclear installation's safety significant events

    International Nuclear Information System (INIS)

    Vidican, D.

    2005-01-01

    This document tries to establish, based on the available documentation, the main steps in development of Assessment of the Events in Nuclear Installations. It takes into account: selection of the safety significant occurrences, establishing the direct cause and contributors as well as the root cause and contributors. Also, the document presents the necessary corrective actions and generic lessons to be learned from the event. The document is based especially on IAEA - ASSET guidelines and DOE root cause analysis Guidance. (author)

  16. The critical dimensions of the response-reinforcer contingency.

    Science.gov (United States)

    Williams, B A.

    2001-05-03

    Two major dimensions of any contingency of reinforcement are the temporal relation between a response and its reinforcer, and the relative frequency of the reinforcer given the response versus when the response has not occurred. Previous data demonstrate that time, per se, is not sufficient to explain the effects of delay-of-reinforcement procedures; needed in addition is some account of the events occurring in the delay interval. Moreover, the effects of the same absolute time values vary greatly across situations, such that any notion of a standard delay-of-reinforcement gradient is simplistic. The effects of reinforcers occurring in the absence of a response depend critically upon the stimulus conditions paired with those reinforcers, in much the same manner as has been shown with Pavlovian contingency effects. However, it is unclear whether the underlying basis of such effects is response competition or changes in the calculus of causation.

  17. Contingency Contractor Optimization Phase 3 Sustainment Software Design Document - Contingency Contractor Optimization Tool - Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Durfee, Justin David; Frazier, Christopher Rawls; Bandlow, Alisa; Jones, Katherine A

    2016-05-01

    This document describes the final software design of the Contingency Contractor Optimization Tool - Prototype. Its purpose is to provide the overall architecture of the software and the logic behind this architecture. Documentation for the individual classes is provided in the application Javadoc. The Contingency Contractor Optimization project is intended to address Department of Defense mandates by delivering a centralized strategic planning tool that allows senior decision makers to quickly and accurately assess the impacts, risks, and mitigation strategies associated with utilizing contract support. The Contingency Contractor Optimization Tool - Prototype was developed in Phase 3 of the OSD ATL Contingency Contractor Optimization project to support strategic planning for contingency contractors. The planning tool uses a model to optimize the Total Force mix by minimizing the combined total costs for selected mission scenarios. The model optimizes the match of personnel types (military, DoD civilian, and contractors) and capabilities to meet mission requirements as effectively as possible, based on risk, cost, and other requirements.

  18. Decisions on the safety of using nuclear power

    International Nuclear Information System (INIS)

    Janka, P.

    1992-01-01

    A new nuclear energy law came into force in Finland in 1988. This law defines general principles, conditions and requirements concerning the use of nuclear power. The law expects the use of nuclear power to be safe and the safety and contingency systems to be sufficient. General rules for the safety of using nuclear power and for safety arrangements and contingency plans are laid down by the government. The Finnish Centre for Radiation and Nuclear Safety has proposed the various rules to be adopted by the government and come into force by 1991. The rules for the safety of nuclear power plants and final waste storage plants contain limits for emissions of radioactive substances and radiation exposure and requirements for the safety in planning, building and using nuclear power plants and final waste storage plants. They observe international experience and research on risks linked to the use of nuclear power from the last few years as well as means and measures to contain these risks under all conditions. Safety arrangements at nuclear power plants contain measures required to be taken by the owner of the plants to thwart unlawful activities aimed at the plant. Most important of these are the rules for actions to be taken in dangerous situations. The proposed contingency plans contain measures to be taken by the owner of the plants in order to contain nuclear damages resulting from an accident. Most important of these are the rules for planning contingency arrangements, keeping these arrangements operable and actions to be taken in emergency situations. (author)

  19. Estimation of initiating event distribution at nuclear power plants by Bayesian procedure

    International Nuclear Information System (INIS)

    Chen Guangming

    1995-01-01

    Initiating events at nuclear power plants such as human errors or components failures may lead to a nuclear accident. The study of the frequency of these events or the distribution of the failure rate is necessary in probabilistic risk assessment for nuclear power plants. This paper presents Bayesian modelling methods for the analysis of the distribution of the failure rate. The method can also be utilized in other related fields especially where the data is sparse. An application of the Bayesian modelling in the analysis of distribution of the time to recover Loss of Off-Site Power ( LOSP) is discussed in the paper

  20. Initiating events in the safety probabilistic analysis of nuclear power plants

    International Nuclear Information System (INIS)

    Stasiulevicius, R.

    1989-01-01

    The importance of the initiating event in the probabilistic safety analysis of nuclear power plants are discussed and the basic procedures necessary for preparing reports, quantification and grouping of the events are described. The examples of initiating events with its occurence medium frequency, included those calculated for OCONEE reactor and Angra-1 reactor are presented. (E.G.)

  1. World wide web for database of Japanese translation on international nuclear event scale reports

    International Nuclear Information System (INIS)

    Watanabe, Norio; Hirano, Masashi

    1999-01-01

    The International Nuclear Event Scale (INES) is a means designed for providing prompt, clear and consistent information related to nuclear events, that occurred at nuclear facilities, and facilitating communication between the nuclear community, the media and the public. The INES is jointly operated by the IAEA and the OECD-NEA. Nuclear events reported are rated by the Scale', a consistent safety significance indicator. The scale runs from level 0, for events with no safety significance, to level 7 for a major accident with widespread health and environmental effects. The Japan Atomic Energy Research Institute (JAERI) has been promptly translating the INES reports into Japanese and developing a world-wide-web database for the Japanese translation, aiming at more efficient utilization of the INES information inside Japan. The present paper briefly introduces the definitions of INES rating levels and the scope of the Scale, and describes the outlines of the database (the information stored in the database, its functions and how to use it). As well, technical use of the INES reports and the availability/ effectiveness of the database are discussed. (author)

  2. Analysis of events occurred at overseas nuclear power plants in 2004

    International Nuclear Information System (INIS)

    Miyazaki, Takamasa; Nishioka, Hiromasa; Sato, Masahiro; Chiba, Gorou; Takagawa, Kenichi; Shimada, Hiroki

    2005-01-01

    The Institute of Nuclear Safety Systems (INSS) investigates the information related to events and incidents occurred at overseas nuclear power plants, and proposes recommendations for the improvement of the safety and reliability of domestic PWR plants by evaluating them. Succeeding to the 2003 report, this report shows the summary of the evaluation activity and of the tendency analysis based on about 2800 information obtained in 2004. The tendency analysis was undertaken on about 1700 analyzed events, from the view point of mechanics, electrics and operations, about the causes, troubled equipments and so on. (author)

  3. Contingencies of Value

    DEFF Research Database (Denmark)

    Strandvad, Sara Malou

    2014-01-01

    Based on a study of the admission test at a design school, this paper investigates the contingencies of aesthetic values as these become visible in assessment practices. Theoretically, the paper takes its starting point in Herrnstein Smith’s notion of ‘contingencies of values’ and outlines...... a pragmatist ground where cultural sociology and economic sociology meet. Informed by the literature on cultural intermediaries, the paper discusses the role of evaluators and the devices which accompany them. Whereas studies of cultural intermediaries traditionally apply a Bourdieusian perspective, recent......, the paper does not accept this storyline. As an alternative, the paper outlines the contingencies of values which are at play at the admission test, composed of official assessment criteria and scoring devices together with conventions within the world of design, and set in motion by interactions...

  4. Appearance-related social comparisons: the role of contingent self-esteem and self-perceptions of attractiveness.

    Science.gov (United States)

    Patrick, Heather; Neighbors, Clayton; Knee, C Raymond

    2004-04-01

    Two studies examined contingent self-esteem (CSE) and responses to appearance-related social comparisons. Study 1 was an experimental study in which women rated a series of advertisements from popular women's magazines. Study 2 employed an event-contingent diary recording procedure. In Study 1, women who were higher in CSE and lower in self-perceptions of attractiveness (SPA) experienced greater decreases in positive affect and greater increases in negative affect following the ad-rating task. Study 2 results supported a mediation model in which women who were higher in CSE felt worse after social comparisons because they made primarily upward comparisons. Overall, results suggest that appearance-related comparisons are more distressing for those who base their self-worth on contingencies and have lower self-perceived attractiveness.

  5. 48 CFR 18.201 - Contingency operation.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contingency operation. 18... METHODS AND CONTRACT TYPES EMERGENCY ACQUISITIONS Emergency Acquisition Flexibilities 18.201 Contingency operation. (a) Contingency operation is defined in 2.101. (b) Micro-purchase threshold. The threshold...

  6. Problems with Contingency Theory: Testing Assumptions Hidden within the Language of Contingency "Theory".

    Science.gov (United States)

    Schoonhoven, Clausia Bird

    1981-01-01

    Discusses problems in contingency theory, which relates organizational structure to the tasks performed and the information needed. Analysis of data from 17 hospitals suggests that traditional contingency theory underrepresents the complexity of relations among technological uncertainty, structure, and organizational effectiveness. (Author/RW)

  7. Optimal self-esteem is contingent: Intrinsic versus extrinsic and upward versus downward contingencies

    NARCIS (Netherlands)

    Vonk, R.; Smit, H.M.M.

    2012-01-01

    We argue that noncontingent, unconditional self-esteem is not optimal but defensive. We introduce the concept of intrinsic contingency, where self-esteem is affected by whether one's actions are self-congruent and conducive to personal growth. Whereas external contingencies, especially social and

  8. 48 CFR 218.201 - Contingency operation.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Contingency operation. 218... Flexibilities 218.201 Contingency operation. (1) Selection, appointment, and termination of appointment... in a contingency contracting force. See 201.603-2(2). (2) Policy for unique item identification...

  9. Crayfish Self-Administer Amphetamine in a Spatially Contingent Task

    Directory of Open Access Journals (Sweden)

    Udita Datta

    2018-05-01

    Full Text Available Natural reward is an essential element of any organism’s ability to adapt to environmental variation. Its underlying circuits and mechanisms guide the learning process as they help associate an event, or cue, with the perception of an outcome’s value. More generally, natural reward serves as the fundamental generator of all motivated behavior. Addictive plant alkaloids are able to activate this circuitry in taxa ranging from planaria to humans. With modularly organized nervous systems and confirmed vulnerabilities to human drugs of abuse, crayfish have recently emerged as a compelling model for the study of the addiction cycle, including psychostimulant effects, sensitization, withdrawal, reinstatement, and drug reward in conditioned place preference paradigms. Here we extend this work with the demonstration of a spatially contingent, operant drug self-administration paradigm for amphetamine. When the animal enters a quadrant of the arena with a particular textured substrate, a computer-based control system delivers amphetamine through an indwelling fine-bore cannula. Resulting reward strength, dose-response, and the time course of operant conditioning were assessed. Individuals experiencing the drug contingent on their behavior, displayed enhanced rates of operant responses compared to that of their yoked (non-contingent counterparts. Application of amphetamine near the supra-esophageal ganglion elicited stronger and more robust increases in operant responding than did systemic infusions. This work demonstrates automated implementation of a spatially contingent self-administration paradigm in crayfish, which provides a powerful tool to explore comparative perspectives in drug-sensitive reward, the mechanisms of learning underlying the addictive cycle, and phylogenetically conserved vulnerabilities to psychostimulant compounds.

  10. The Necessity of Contingency or Contingent Necessity: Meillassoux, Hegel, and the Subject

    Directory of Open Access Journals (Sweden)

    John Van Houdt

    2011-06-01

    Full Text Available This article addresses the relationship of contingency to necessity as developed by Quentin Meillassoux and G.W.F. Hegel. Meillassoux criticizes the restriction of possibility by modern philosophy to the conditions of the transcendental subject, which he calls ‘correlationism’, and opposes to this correlationism, mathematics as an absolute form of thought. The arch-figure of a metaphysical version of correlationism for Meillassoux is Hegel. This article argues that, while Meillassoux is right to criticize a version of correlationism for restricting the range of contingency, he overlooks Hegel’s unique contribution to this issue. Hegel provides us a version of necessity modeled on the mathematical proof which answers Meillassoux’s concerns about correlationist versions of necessity but does not altogether jettison the concept of the subject. Instead, the subject in Hegel is a contingent interruption which emerges from the breaks in the kinds of necessity we posit about the world. Hegel offers us a way of tying these two concepts together in what I call ‘contingent necessity’.

  11. GC Side Event: Future of Nuclear Energy: Engaging the Young Generation. Presentations

    International Nuclear Information System (INIS)

    2017-01-01

    This event presented the IAEA’s programmes for the education and training of a new generation of nuclear professionals. It also featured the annual European Master of Science in Nuclear Engineering (EMSNE) award ceremony

  12. Nuclear and Radiological Event Scale Turns 20. INES Helps Authorities Rate Events and Communicate Their Significance

    International Nuclear Information System (INIS)

    Verlini, Giovanni

    2011-01-01

    Originally developed in the 1990s jointly by IAEA and Nuclear Energy Agency of the Organization for Economic Co-operation and Development (OECD/NEA) and Member States experts, INES was last revised in 2008 to become a more versatile and informative tool. INES is now designed to address events associated with the transport, storage and use of radioactive material and radiation sources, whether they occur at a nuclear installation or not.

  13. 40 CFR 264.53 - Copies of contingency plan.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Copies of contingency plan. 264.53... Contingency Plan and Emergency Procedures § 264.53 Copies of contingency plan. A copy of the contingency plan... called upon to provide emergency services. [Comment: The contingency plan must be submitted to the...

  14. Stresses on nuclear power plant buildings by extraordinary events

    International Nuclear Information System (INIS)

    Woelfel, E.

    1977-01-01

    Nuclear power plant buildings must be functional to such an extend that even after the occurence of extraordinary events (earthquake, airoplane crash, gas cloud explosion), the reactor can be safety shut off, in order to avoid danger from the nuclear power plant. Evidence for this can only be given by calculations which shall meet the following requirements: The calculation results shall be safe and reliable. The calculation effort shall match the realizable accuracy. The calculation shall lead to an economical determination. An example of ascertainment of nuclear power plants in regard to earthquakes, shows the difficulties standing against a fulfillment of these requirements. (orig.) [de

  15. Experience feedback of operation events in Ling'ao phase Ⅱ nuclear power plant

    International Nuclear Information System (INIS)

    Xiao Zhi; Tao Shusheng; Sun Guochen; Zhang Zengqing

    2012-01-01

    As a new operating nuclear power plant, Ling'ao Phase Ⅱ occurred 20 pieces of operational events in one year of first cycle. By analyzing the events in this paper, the causes of the events are mainly concentrated in three aspects: interface between commissioning and operating, DCS system and the management of human factors. Finally, author gives some suggestions on experience feedback, as a reference to other similar nuclear power plants. (authors)

  16. Trend analysis of fire events at nuclear power plants

    International Nuclear Information System (INIS)

    Shimada, Hiroki

    2007-01-01

    We performed trend analyses to compare fire events occurring overseas (1995-2005) and in Japan (1966-2006). We decided to do this after extracting data on incidents (storms, heavy rain, tsunamis, fires, etc.) occurring at overseas nuclear power plants from the Events Occurred at Overseas Nuclear Power Plants recorded in the Nuclear Information Database at the Institute of Nuclear Safety System (INSS) and finding that fires were the most common of the incidents. Analyses compared the number of fires occurring domestically and overseas and analyzed their causes and the effect of the fires on the power plants. As a result, we found that electrical fires caused by such things as current overheating and electric arcing, account for over one half of the domestic and overseas incidents of fire, which indicates that maintenance management of electric facilities is the most important aspect of fire prevention. Also, roughly the same number of operational fires occurred at domestic and overseas plants, judging from the figures for annual occurrences per unit. However, the overall number of fires per unit at domestic facilities is one fourth that of overseas facilities. We surmise that, while management of operations that utilizes fire is comparable for overseas and domestic plants, this disparity results from differences in the way maintenance is carried out at facilities. (author)

  17. 49 CFR 1542.301 - Contingency plan.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 9 2010-10-01 2010-10-01 false Contingency plan. 1542.301 Section 1542.301..., DEPARTMENT OF HOMELAND SECURITY CIVIL AVIATION SECURITY AIRPORT SECURITY Contingency Measures § 1542.301 Contingency plan. (a) Each airport operator required to have a security program under § 1542.103(a) and (b...

  18. Application of the international nuclear events scale in Mexico

    International Nuclear Information System (INIS)

    Ramirez, R.

    1997-01-01

    Currently in Mexico, there are two nuclear power reactors and one research reactor operating. Any event related have to be reported to the regulatory body which is in charge of the evaluation and classification using the IAEA INES system. This system has been used since its creation, process in which personnel from the regulatory body was involved. This paper describes the reporting, evaluation and classification process by which events go through with the use of the INES system

  19. I spy with my little eye - the detection of intentional contingency in early psychosis

    NARCIS (Netherlands)

    Fett, A.J.; Berdugo, C.I.G.; Hanssen, E.; Lemmers-Jansen, I.; Shergill, S.S.; Krabbendam, L.

    2015-01-01

    Introduction: Paranoid delusions have been associated with a tendency to over-attribute intentionality and contingency to others' actions and incidental events in individuals with chronic psychosis. However, this hyper-associative perception bias has not been investigated in the early illness stages

  20. Analysis of external flooding events occurred in foreign nuclear power plant sites

    International Nuclear Information System (INIS)

    Li Dan; Cai Hankun; Xiao Zhi; An Hongzhen; Mao Huan

    2013-01-01

    This paper screens and studies 17 external flooding events occurred in foreign NPP sites, analysis the characteristic of external flooding events based on the source of the flooding, the impact on the building, systems and equipment, as well as the threat to nuclear safety. Furthermore, based on the experiences and lessons learned from Fukushima nuclear accident relating to external flooding and countermeasures carried out in the world, some suggestions are proposed in order to improve external flooding response capacity for Chinese NPPs. (authors)

  1. Trend analyses of the emergency diesel generator problem events in Japanese and U.S. nuclear power plants

    International Nuclear Information System (INIS)

    Shimada, Yoshio

    2011-01-01

    Up to 2009, the author and a colleague conducted trend analyses of problem events related to main generators, emergency diesel generators, breakers, motors and transformers which are more likely to cause problems than other electric components in nuclear power plants. Among the electric components with high frequency of defect occurrence, i.e., emergency diesel generators, several years have passed since the last analyses. These are very important components needed to stop a nuclear reactor safely and to cool it down during external power supply loses. Then trend analyses were conducted for the second time. The trend analyses were performed on 80 problem events with emergency diesel generators which had occurred in U.S. nuclear power plants in the five years from 2005 through 2009 among events reported in the Licensee Event Reports (LERs: event reports submitted to NRC by U.S. nuclear power plants) which have been registered in the nuclear information database of the Institute of Nuclear Safety System, Inc. (INSS) , as well as 40 events registered in the Nuclear Information Archives (NUCIA), which occurred in Japanese nuclear power plants in the same time period. It was learned from the trend analyses of the problem events with emergency diesel generators that frequency of defect occurrence are high in both Japanese and US plants during plant operations and functional tests (that is, defects can be discovered effectively in advance), so that implementation of periodical functional tests under plant operation is an important task for the future. (author)

  2. The Reinforcing Event (RE) Menu

    Science.gov (United States)

    Addison, Roger M.; Homme, Lloyd E.

    1973-01-01

    A motivational system, the Contingency Management System, uses contracts in which some amount of defined task behavior is demanded for some interval of reinforcing event. The Reinforcing Event Menu, a list of high probability reinforcing behaviors, is used in the system as a prompting device for the learner and as an aid for the administrator in…

  3. ACCOUNTING FOR CONTINGENT CONSIDERATIONS IN BUSINESS COMBINATIONS

    Directory of Open Access Journals (Sweden)

    Gurgen KALASHYAN

    2017-07-01

    Full Text Available According to IFRS 3 Business Combinations contingent considerations must be included in the total consideration given for the acquired entity along with cash, other assets, ordinary or preference equity instruments, options, warrants. The contingent consideration is the determined amount which acquiring entity has to pay to acquired entity provided, that certain conditions will be fulfilled in the future. In case the provisions are not satisfied, we will get the situation when the amount of contingent consideration has been included in the total consideration given in the business combination, but in fact, the acquirer has not paid that amount. In its turn, the acquired entity will recognize the contingent consideration as a financial asset according to IFRS 9 Financial Instruments. In that case, it would be appropriately to recognize the contingent consideration as a contingent asset applying IAS 37. In the Article the author will explore the challenges of contingent consideration accounting and suggest the ways of solving the above mentioned problems.

  4. Contingency management: perspectives of Australian service providers.

    Science.gov (United States)

    Cameron, Jacqui; Ritter, Alison

    2007-03-01

    Given the very positive and extensive research evidence demonstrating efficacy and effectiveness of contingency management, it is important that Australia explore whether contingency management has a role to play in our own treatment context. Qualitative interviews were conducted with 30 experienced alcohol and drug practitioners, service managers and policy-makers in Victoria. Interviewees were selected to represent the range of drug treatment services types and included rural representation. A semi-structured interview schedule, covering their perceptions and practices of contingency management was used. All interviews were transcribed verbatim and analysed using N2 qualitative data analysis program. The majority of key informants were positively inclined toward contingency management, notwithstanding some concerns about the philosophical underpinnings. Concerns were raised in relation to the use of monetary rewards. Examples of the use of contingency management provided by key informants demonstrated an over-inclusive definition: all the examples did not adhere to the key principles of contingency management. This may create problems if a structured contingency management were to be introduced in Australia. Contingency management is an important adjunctive treatment intervention and its use in Australia has the potential to enhance treatment outcomes. No unmanageable barriers were identified in this study.

  5. The Use of the International Nuclear and Radiological Event Scale (INES) for Event Communication. Guidelines and Good Practices for Setting up a National Framework on the Effective Use of INES for Event Communication

    International Nuclear Information System (INIS)

    2014-10-01

    The IAEA’s International Nuclear and Radiological Event Scale (INES) was developed in 1990 by international experts convened by the IAEA and the OECD Nuclear Energy Agency with the aim of communicating the safety significance of events at nuclear installations. Since then, INES has been expanded to meet the growing need for communicating the safety significance of events giving rise to radiation risk. At present, INES is used for communicating to the public, in a consistent way, the safety significance of an event associated with sources of radiation, whether or not the event occurs at a facility. INES covers a wide spectrum of practices, including industrial uses such as gammagraphy, the use of sources of radiation in medicine, activities at nuclear power plants and research reactors, activities at spent nuclear fuel and radioactive waste management facilities, and the transport of radioactive material. INES has become a widely used tool for putting the safety significance of radiation events into proper perspective. The number of countries using INES has risen steadily over the past five years. As a result, there is a need to ensure the harmonized application of this scale worldwide. Up to now, international activities regarding INES have focused more on developing guidance on rating events than on the ways of using INES. This publication is the first to provide guidance on establishing or improving a national framework for the effective use of INES during event communication. It has been prepared on the basis of national experience with communicating events that have occurred since the introduction of INES. This publication also includes, in Annex I, lessons learned from the application of INES during and after the accident at the Fukushima Daiichi nuclear power plant, Guidance on the Use of INES in Evolving Severe Accidents

  6. Protection of nuclear power plants against external events

    International Nuclear Information System (INIS)

    Kinet, P.; Roch, R.

    1978-01-01

    The paper describes the methodology of the safety design of nuclear power plants against external events with particular emphasis of the Belgian Plants. The site analysis and potential hazards evaluation are explained. The different designs incorporating various combinations of reinforced structures and dedicated systems are analysed. The particular lay-out and systems of the Belgian Plants are explained. (author)

  7. Root Cause Analysis Following an Event at a Nuclear Installation: Reference Manual

    International Nuclear Information System (INIS)

    2015-01-01

    Following an event at a nuclear installation, it is important to determine accurately its root causes so that effective corrective actions can be implemented. As stated in IAEA Safety Standards Series No. SF-1, Fundamental Safety Principles: “Processes must be put in place for the feedback and analysis of operating experience”. If this process is completed effectively, the probability of a similar event occurring is significantly reduced. Guidance on how to establish and implement such a process is given in IAEA Safety Standards Series No. NS-G-2.11, A System for the Feedback of Experience from Events in Nuclear Installations. To cater for the diverse nature of operating experience events, several different root cause analysis (RCA) methodologies and techniques have been developed for effective investigation and analysis. An event here is understood as any unanticipated sequence of occurrences that results in, or potentially results in, consequences to plant operation and safety. RCA is not a topic uniquely relevant to event investigators: knowledge of the concepts enhances the learning characteristics of the whole organization. This knowledge also makes a positive contribution to nuclear safety and helps to foster a culture of preventing event occurrence. This publication allows organizations to deepen their knowledge of these methodologies and techniques and also provides new organizations with a broad overview of the RCA process. It is the outcome of a coordinated effort involving the participation of experts from nuclear organizations, the energy industry and research centres in several Member States. This publication also complements IAEA Services Series No. 10, PROSPER Guidelines: Guidelines for Peer Review and for Plant Self- Assessment of Operational Experience Feedback Process, and is intended to form part of a suite of publications developing the principles set forth in these guidelines. In addition to the information and description of RCA

  8. ACCIDENTS AND UNSCHEDULED EVENTS ASSOCIATED WITH NON-NUCLEAR ENERGY RESOURCES AND TECHNOLOGY

    Science.gov (United States)

    Accidents and unscheduled events associated with non-nuclear energy resources and technology are identified for each step in the energy cycle. Both natural and anthropogenic causes of accidents or unscheduled events are considered. Data concerning these accidents are summarized. ...

  9. The Effect of the Japan 2011 Disaster on Nuclear and Alternative Energy Stocks Worldwide: An Event Study

    Directory of Open Access Journals (Sweden)

    Robert Ferstl

    2012-05-01

    Full Text Available This event study investigates the impact of the Japanese nuclear disaster in Fukushima-Daiichi on the daily stock prices of French, German, Japanese, and U.S. nuclear utility and alternative energy firms. Hypotheses regarding the (cumulative abnormal returns based on a three-factor model are analyzed through joint tests by multivariate regression models and bootstrapping. Our results show significant abnormal returns for Japanese nuclear utility firms during the one-week event window and the subsequent four-week post-event window. Furthermore, while French and German nuclear utility and alternative energy stocks exhibit significant abnormal returns during the event window, we cannot confirm abnormal returns for U.S. stocks.

  10. Alternative Forms of Fit in Contingency Theory.

    Science.gov (United States)

    Drazin, Robert; Van de Ven, Andrew H.

    1985-01-01

    This paper examines the selection, interaction, and systems approaches to fit in structural contingency theory. The concepts of fit evaluated may be applied not only to structural contingency theory but to contingency theories in general. (MD)

  11. Appendix F - Sample Contingency Plan

    Science.gov (United States)

    This sample Contingency Plan in Appendix F is intended to provide examples of contingency planning as a reference when a facility determines that the required secondary containment is impracticable, pursuant to 40 CFR §112.7(d).

  12. Dating the age of a recent nuclear event by gamma-spectrometry

    International Nuclear Information System (INIS)

    Nir-El, Y.

    2006-01-01

    The age of a recent, i.e., fresh, nuclear event can be determined by measuring the activity of short-lived parent and daughter fission products. The event studied was a short irradiation, of a small sample of uranium, in a nuclear reactor. Two clocks were investigated, 92 Sr- 92 Y and 135 I- 135 Xe. Measurements of the source by gamma-spectrometry yielded very good agreement between true and measured ages. The upper and lower age limits of applicability for the clocks in question were defined. The half-life of 92 Sr was found 2.635±0.008 hours and of 135 I 6.65±0.04 hours. (author)

  13. The nuclear and radiological terrorism events and the strategy to combat

    International Nuclear Information System (INIS)

    Wang Shanqiang

    2004-01-01

    The super-terrorism using large-scale antipersonnel weapons has become one real threat for the contemporary international society to face. The radioactive materials releasing from the nuclear and radiological terrorism events will cause the personnel dead and injured with mental state dismay, which break national official business, people life, society stability and economy development, and give mankind social result in endanger with large affect and have been concerned by the people all over the world. This paper analyzes the possible pattern and harmfulness of the nuclear and radiological terrorism events, at the same time puts forward the strategy to combat them according to their three categories and typical scenes. (author)

  14. Thevenin Equivalent Method for Dynamic Contingency Assessment

    DEFF Research Database (Denmark)

    Møller, Jakob Glarbo; Jóhannsson, Hjörtur; Østergaard, Jacob

    2015-01-01

    A method that exploits Thevenin equivalent representation for obtaining post-contingency steady-state nodal voltages is integrated with a method of detecting post-contingency aperiodic small-signal instability. The task of integrating stability assessment with contingency assessment is challenged...... by the cases of unstable post-contingency conditions. For unstable postcontingency conditions there exists no credible steady-state which can be used for basis of a stability assessment. This paper demonstrates how Thevenin Equivalent methods can be applied in algebraic representation of such bifurcation...... points which may be used in assessment of post-contingency aperiodic small-signal stability. The assessment method is introduced with a numeric example....

  15. Yampa River Valley sub-area contingency plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-08-01

    The Yampa River Valley sub-area contingency plan (Contingency Plan) has been prepared for two counties in northwestern Colorado: Moffat County and Routt County. The Contingency Plan is provided in two parts, the Contingency Plan and the Emergency Response Action Plan (ERAP). The Contingency Plan provides information that should be helpful in planning to minimize the impact of an oil spill or hazardous material incident. It contains discussions of planning and response role, hazards identification, vulnerability analysis, risk analysis, cleanup, cost recovery, training, and health and safety. It includes information on the incident command system, notifications, response capabilities, emergency response organizations, evacuation and shelter-in-place, and immediate actions.

  16. Electrical systems at the nuclear power plant of Laguna Verde after the event in Fukushima

    International Nuclear Information System (INIS)

    Lopez J, J. F.

    2016-09-01

    During the event at the nuclear power plant of Fukushima Daichii (Japan), the electrical systems were affected both Onsite and Offsite, which were lost for a long time with irreversible consequences. Therefore, the Mexican Regulatory Body known as the Comision Nacional de Seguridad Nuclear y Salvaguardias (CNSNS) has taken various actions to review the current capacity of the electrical systems at the nuclear power plant of Laguna Verde (NPP-LV) before an event beyond the design bases. The CNSNS made special inspections to the NPP-LV to verify the current capacity of the electrical systems of Ac and Dc; as a result of the inspections, requirements were generated that must be met to demonstrate that has the capacity to deal with events beyond the design bases. In addition, CNSNS has participated in the Ibero-American Forum to deal with resistance testing. Is important to note that prior to the event at the nuclear power plant of Fukushima, the NPP-LV had implemented 1) the project Extended Power Increase in both Units of the NPP-LV, and 2) the Generic Charter 2006-02, both issues are considered contributions in the robustness of electrical systems. But it is also important to mention that the US Nuclear Regulatory Commission will soon issue mitigation strategies for a Station Blackout event, which could involve new actions at nuclear power plants. Based on the aforementioned, the CNSNS concludes that all the actions being taken contribute to the strengthening of the NPP-LV electrical systems, in order to increase their reliability, safety and operation when these are required to deal with events beyond the design bases as the event occurred in Fukushima Daichii and avoid as far as possible, damage in the reactor cores of the NPP-LV. (Author)

  17. Systems for reporting unusual events in nuclear power plants

    International Nuclear Information System (INIS)

    1989-01-01

    Many Member States with nuclear power programmes have established, and are operating, systems for collecting, assessing and disseminating information on safety related events in nuclear power plants. The Agency has recognized the importance of such systems and of achieving compatibility between them. It also recognizes the advantage to be derived from international efforts to exchange operational experience on a worldwide basis. In response to requests put forward during the Special Session of the IAEA General Conference held in September 1986, and to the recommendations made by the International Nuclear Safety Advisory Group (INSAG) to strengthen international co-operation in nuclear safety and the exchange of information on operating experience, the IAEA has been following a two-step approach. Firstly, it continues to assist Member States to establish, improve or harmonize their national systems for collecting, assessing and disseminating safety related operational experience, and secondly, it continues to reinforce the IAEA system for reporting unusual events with safety significance (IAEA Incident Reporting System - IAEA-IRS). Although the prime objective of both activities is to assist regulatory bodies and operating organizations to improve operational safety, operating organizations may also benefit if a similar approach is used to improve equipment reliability and plant availability. The present Guide contains a recommended scheme based on national and international practice applicable to the management of safety related operational experience in nuclear power plants. The user will have to adapt this guidance for specific national conditions and practices. It is important to realize however that for an effective exchange of information through the IAEA-IRS it is a prerequisite to follow the procedures given in the relevant part of this Guide

  18. 40 CFR 265.54 - Amendment of contingency plan.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Amendment of contingency plan. 265.54... DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 265.54 Amendment of contingency plan. The contingency plan must be reviewed, and immediately amended, if necessary, whenever: (a) Applicable regulations...

  19. 40 CFR 264.54 - Amendment of contingency plan.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Amendment of contingency plan. 264.54 Section 264.54 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... Contingency Plan and Emergency Procedures § 264.54 Amendment of contingency plan. The contingency plan must be...

  20. Nuclear and energies. Synthesis of significant events from June 2013 to December 2013

    International Nuclear Information System (INIS)

    Lenail, Bernard; Ducroux, Guy; Lamorlette, Guy; Seyve, Claude; Simonnet, Jacques; Bordier, Jean-Claude; Justin, Francois; Darricau, Aime; Seyve, Claude; Raisonnier, Daniele; Lenail, Bernard; Deleigne, Francoise

    2013-12-01

    The first two articles concern the energy sector, generally speaking. Among them, the first one addresses the issue of energy transition (perspectives in France, situation in Germany where transition appears to be expensive and polluting with some perverse effects, a world shock wave created by shale gases, proposition by EDF to extend power station life duration from 40 to 50 years, EDF's commitment in nuclear revival in the UK and withdrawal from the USA, new strategy for GDF-Suez) and the second one current events in the renewable energy sector (in China, Germany, UK and Canada, French policy, wind energy bids in France). A second set of articles addresses the nuclear sector: recent evolutions of the uranium industry (mining activities and locations), the back end of the fuel cycle and the dismantling (activities of AREVA, public debate on Cigeo and building permit for ICEDA in France, activities and measures in Germany, in England, in the USA, and in Japan, study performed by the Nuclear Energy Agency on the economic aspect of the back end of the nuclear fuel cycle), the situation of nuclear reactors (perspectives in the world for 2050, perspectives, activities and important events in France, Belgium, Netherlands, United Kingdom, Finland, including the EPR, Turkey, Poland, Czech Republic, Belarus, Russia, China, South Korea, India, Pakistan, Japan, USA and Brazil), the deconstruction of nuclear power plants (legal framework in France, wastes as a major issue for dismantling, industrial challenges of dismantling). The last set of articles concern social and societal aspects of the nuclear sector: recent events in France (for AREVA regarding staff and investments, anti-nuclear activities and momentum), the Cigeo project of geological disposal of high-activity nuclear wastes, hostages in Niger, and diplomatic advances about the Iranian nuclear programme issue

  1. Network location theory and contingency planning

    Energy Technology Data Exchange (ETDEWEB)

    Hakimi, S L

    1983-08-01

    A brief survey of results in network location theory is first presented. Then, a systems view of contingency planning is described. Finally, some results in location theory are re-examined and it is shown that they are motivated by contingency planning considerations. Some new issues and problems in location theory are described, which, if properly tackled, will have a substantial impact on contingency planning in transportation.

  2. Nuclear and energies - synthesis of outstanding events from April 2011 to November 2011. No. 58/December 2011

    International Nuclear Information System (INIS)

    Lenail, Bernard; Ducroux, Guy; Lamorlette, Guy; Gollion, Jacques; Seyve, Claude; Robin, Jean-Pierre; Fromant, Bernard; Raisonnier, Daniele; Lepine, Gerard; Vandevoir, Roger

    2011-12-01

    While referring to recent events, the articles discuss and comment the evolution of the energy sector (perspectives in terms of energy mix), the current events in the field of renewable energies, the struggle against the greenhouse effect (Grenelle de l'Environnement, impact of the nuclear sector on the environment in France and in the world), the limited impact of the Fukushima accident on the uranium market, the nuclear fuel fabrication (reorganization of production lines by AREVA), the nuclear reactors (perspectives and events in the world, and in France for different sites), the relationship between the nuclear industry and the society (surveys, international issues, perception of nuclear safety)

  3. A review for identification of initiating events in event tree development process on nuclear power plants

    International Nuclear Information System (INIS)

    Riyadi, Eko H.

    2014-01-01

    Initiating event is defined as any event either internal or external to the nuclear power plants (NPPs) that perturbs the steady state operation of the plant, if operating, thereby initiating an abnormal event such as transient or loss of coolant accident (LOCA) within the NPPs. These initiating events trigger sequences of events that challenge plant control and safety systems whose failure could potentially lead to core damage or large early release. Selection for initiating events consists of two steps i.e. first step, definition of possible events, such as by evaluating a comprehensive engineering, and by constructing a top level logic model. Then the second step, grouping of identified initiating event's by the safety function to be performed or combinations of systems responses. Therefore, the purpose of this paper is to discuss initiating events identification in event tree development process and to reviews other probabilistic safety assessments (PSA). The identification of initiating events also involves the past operating experience, review of other PSA, failure mode and effect analysis (FMEA), feedback from system modeling, and master logic diagram (special type of fault tree). By using the method of study for the condition of the traditional US PSA categorization in detail, could be obtained the important initiating events that are categorized into LOCA, transients and external events

  4. 30 CFR 218.152 - Fishermen's Contingency Fund.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Fishermen's Contingency Fund. 218.152 Section 218.152 Mineral Resources MINERALS MANAGEMENT SERVICE, DEPARTMENT OF THE INTERIOR MINERALS REVENUE..., Offshore § 218.152 Fishermen's Contingency Fund. Upon the establishment of the Fishermen's Contingency Fund...

  5. 40 CFR 265.53 - Copies of contingency plan.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Copies of contingency plan. 265.53... DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 265.53 Copies of contingency plan. A copy of the contingency plan and all revisions to the plan must be: (a) Maintained at the facility; and (b...

  6. GC Side Event: Africa's Energy Needs and the Potential Role of Nuclear Power. Presentations

    International Nuclear Information System (INIS)

    2015-01-01

    Energy is central to development, and energy availability, accessibility and affordability are central challenges for most African countries. Due to rapidly growing energy demand, the need for socioeconomic development, persistent concerns over climate change and environmental impacts and dependence on imported supplies of fossil fuels, African Member States are looking into possible options to secure sustainable energy supplies, including nuclear energy. The IAEA assists those countries in assessing the nuclear power option and building the necessary infrastructure for a safe, secure and sustainable nuclear power programme. This year, the IAEA is conducting Integrated Nuclear Infrastructure Review (INIR) missions to three African countries (Nigeria, Kenya and Morocco) considering introducing nuclear power. The side event presents recent updates from Africa on the potential role of nuclear power, including the IAEA Third Regional Conference on Energy and Nuclear Power in Africa, held in Mombasa, Kenya, in April 2015, an initiative to launch a new African network for enhancing nuclear power programme development, and others. The event reports on recent developments in several African Member States considering, embarking on, or expanding national nuclear power programmes.

  7. Consideration of external events in the design of nuclear facilities other than nuclear power plants, with emphasis on earthquakes

    International Nuclear Information System (INIS)

    2003-03-01

    The design of nuclear facilities other than nuclear power plants in relation to external events is not a well harmonized practice around the world. Traditionally, the design of these facilities has either been left to the provisions collected in national building codes and other industrial codes not specifically intended for nuclear facilities, or it has been the subject of complex analyses of the type usually performed for nuclear power plants. The IAEA has recently started a programme of development of safety standards for such facilities. The need to define the appropriate safety requirements for nuclear installations prompted a generic review of siting and design approaches for these facilities in relation to external events. Therefore the assessment methods for siting and design were reviewed by the engineering community to provide the overall design of such facilities with the necessary reliability level. This report aims to provide guidelines for the assessment of the safety of nuclear facilities other than nuclear power plants in relation to external events through the application of simplified methods and procedures for their siting and design. The approach adopted is both simplified and conservative compared with that used for power reactors. It seeks to provide a rational balance for a suitable combination of sustainable effort in site investigations and refinement in design procedures, compatible with the assigned safety objectives. This publication is related to IAEA-TECDOC-348 'Earthquake Resistant Design of Nuclear Facilities with Limited Radioactive Inventory' (1985) which focused on the seismic design of nuclear facilities with limited radioactive inventory. After some 17 years, parts of IAEA-TECDOC-348 needed modification, as new operational data have become available from many facilities. In addition, sophisticated design methodologies are now more easily obtainable, and experts felt that the trade-off between sustainable investment in the

  8. Development and Validation of the Sexual Contingent Self-Worth Scale.

    Science.gov (United States)

    Glowacka, Maria; Rosen, Natalie O; Vannier, Sarah; MacLellan, Margaret C

    2017-01-01

    Sexual contingent self-worth (CSW) refers to self-worth that is dependent on maintaining a sexual relationship, and has not been studied previously. This novel construct may have implications for sexual, relationship, and psychological well-being, because it could affect the cognitions, affect, and behaviors of individuals in sexual relationships. The purpose of this study was to develop the Sexual Contingent Self-Worth Scale and examine its reliability and validity in community samples. Two separate online studies (N = 329 and N = 282) included men and women who were in committed, sexually active relationships. The Sexual CSW Scale was adapted from a validated measure of relationship CSW. In Study 1, participants completed the Sexual CSW Scale, whereas in Study 2, participants also responded to standardized measures of related constructs. In addition, participants completed the Sexual CSW Scale again two weeks later in Study 2. Factor analysis yielded two subscales: (a) sexual CSW dependent on positive sexual events in the relationship and (b) sexual CSW dependent on negative sexual events. Results indicated good construct validity, incremental validity, internal consistency, and test-retest reliability for the Sexual CSW Scale. This research contributes to the fields of both CSW and sexuality by introducing a novel domain of CSW.

  9. Equilibria of perceptrons for simple contingency problems.

    Science.gov (United States)

    Dawson, Michael R W; Dupuis, Brian

    2012-08-01

    The contingency between cues and outcomes is fundamentally important to theories of causal reasoning and to theories of associative learning. Researchers have computed the equilibria of Rescorla-Wagner models for a variety of contingency problems, and have used these equilibria to identify situations in which the Rescorla-Wagner model is consistent, or inconsistent, with normative models of contingency. Mathematical analyses that directly compare artificial neural networks to contingency theory have not been performed, because of the assumed equivalence between the Rescorla-Wagner learning rule and the delta rule training of artificial neural networks. However, recent results indicate that this equivalence is not as straightforward as typically assumed, suggesting a strong need for mathematical accounts of how networks deal with contingency problems. One such analysis is presented here, where it is proven that the structure of the equilibrium for a simple network trained on a basic contingency problem is quite different from the structure of the equilibrium for a Rescorla-Wagner model faced with the same problem. However, these structural differences lead to functionally equivalent behavior. The implications of this result for the relationships between associative learning, contingency theory, and connectionism are discussed.

  10. 50 CFR 296.3 - Fishermen's contingency fund.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 7 2010-10-01 2010-10-01 false Fishermen's contingency fund. 296.3... ADMINISTRATION, DEPARTMENT OF COMMERCE CONTINENTAL SHELF FISHERMEN'S CONTINGENCY FUND § 296.3 Fishermen's contingency fund. (a) General. There is established in the Treasury of the United States the Fishermen's...

  11. Study of the Model of Activating Contingency Plans within Disruptive Incidents by Stages%突发事件下分阶段启动应急预案模型研究

    Institute of Scientific and Technical Information of China (English)

    于辉; 江智慧

    2011-01-01

    activation program for contingency plans. The numerical analysis shows that competitive ratios can help assess the effectiveness of the proposed contingency programs.The first part discusses the general model of contingency plan activation and the importance of using the model to deal with emergencies. Activating the contingency plans at the pre-disposition plan can control and reduce the impact of unexpected events on society, and reduce the cost of emergency response. Moreover, activating contingency plans at this early stage allows decision makers to more effectively access and evaluate information on the emergency event. Plans executed at this stage can provide the basis for follow-up plans and enhance its enforceability.The second part proposes a mathematical model of contingency plan activation. Timely response to each emergency event is crucial to the control of damages. Follow-up costs also need to be considered when executing the contingency plan. The execution of contingency plans at the pre-disposal stage can control the emergency, and reduce follow-up costs and potential losses. Our findings show that emergency start-up costs can directly affect the initial response time to crises. High pre-disposal and emergency start-up costs can delay the initial response time. Conversely, low start-up costs can shorten the initial response time to emergency events.In general, the pre-disposal unit costs are very small and are much smaller than the unit time losses caused by unexpected events.Therefore, the pre-disposal program is often accompanied by unexpected events and the immediate impact of natural disasters (earthquakes, fires, floods, etc. ). Starting the pre-disposal program is strongly suggested based on the findings of this study.In summary, activating contingency plans in the pre-disposal stage is crucial to controlling the impact and costs of emergency events on society. Phased execution of contingency plans can help control the cost of managing emergencies and

  12. Contingency-Constrained Unit Commitmentin Meshed Isolated Power Systems

    DEFF Research Database (Denmark)

    Sokoler, Leo Emil; Vinter, Peter; Bærentsen, Runi

    2015-01-01

    is kept above a predefined limit in the event of a contingency. The minimum frequency constraints are formulated using novel sufficient conditions that take into account the system inertia and the dynamics of the power generators. The proposed sufficient conditions are attractive from both a computational...... and a modelling point of view. We compare the ORPP to a unit commitment problem that only considers the stationary behavior of the frequency. Simulations based on a Faroe Islands case study show that, without being overly conservative, potential blackouts and power outages can be avoided using the ORPP...

  13. Motor contingency learning and infants with Spina Bifida.

    Science.gov (United States)

    Taylor, Heather B; Barnes, Marcia A; Landry, Susan H; Swank, Paul; Fletcher, Jack M; Huang, Furong

    2013-02-01

    Infants with Spina Bifida (SB) were compared to typically developing infants (TD) using a conjugate reinforcement paradigm at 6 months-of-age (n = 98) to evaluate learning, and retention of a sensory-motor contingency. Analyses evaluated infant arm-waving rates at baseline (wrist not tethered to mobile), during acquisition of the sensory-motor contingency (wrist tethered), and immediately after the acquisition phase and then after a delay (wrist not tethered), controlling for arm reaching ability, gestational age, and socioeconomic status. Although both groups responded to the contingency with increased arm-waving from baseline to acquisition, 15% to 29% fewer infants with SB than TD were found to learn the contingency depending on the criterion used to determine contingency learning. In addition, infants with SB who had learned the contingency had more difficulty retaining the contingency over time when sensory feedback was absent. The findings suggest that infants with SB do not learn motor contingencies as easily or at the same rate as TD infants, and are more likely to decrease motor responses when sensory feedback is absent. Results are discussed with reference to research on contingency learning in infants with and without neurodevelopmental disorders, and with reference to motor learning in school-age children with SB.

  14. Advanced nuclear plant design options to cope with external events

    International Nuclear Information System (INIS)

    2006-02-01

    With the stagnation period of nuclear power apparently coming to an end, there is a renewed interest in many Member States in the development and application of nuclear power plants (NPPs) with advanced reactors. Decisions on the construction of several NPPs with evolutionary light water reactors have been made (e.g. EPR Finland for Finland and France) and more are under consideration. There is a noticeable progress in the development and demonstration of innovative high temperature gas cooled reactors, for example, in China, South Africa and Japan. The Generation IV International Forum has defined the International Near Term Deployment programme and, for a more distant perspective, six innovative nuclear energy systems have been selected and certain R and D started by several participating countries. National efforts on design and technology development for NPPs with advanced reactors, both evolutionary and innovative, are ongoing in many Member States. Advanced NPPs have an opportunity to be built at many sites around the world, with very broad siting conditions. There are special concerns that safety of these advanced reactors may be challenged by external events following new scenarios and failure modes, different from those well known for the currently operated reactors. Therefore, the engineering community identified the need to assess the proposed design configurations in relation to external scenarios at the earliest stages of the design development. It appears that an early design optimization in relation to external events is a necessary requirement to achieve safe and economical advanced nuclear power plants. Reflecting on these developments, the IAEA has planned the preparation of a report to define design options for protection from external event impacts in NPPs with evolutionary and innovative reactors. The objective of this publication is to present the state-of-the-art in design approaches for the protection of NPPs with evolutionary and innovative

  15. The International Nuclear Event Scale (INES) user's manual. 2001 edition; La escala internacional de sucesos nucleares (INES) manual del usuario. Edicion de 2001

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-12-01

    The International Nuclear Event Scale (INES) was introduced in March 1990 jointly by the International Atomic Energy Agency (IAEA) and the Nuclear Energy Agency of the Organisation for Economic Co-operation and Development (OECD/NEA). Its primary purpose is to facilitate communication and understanding between the nuclear community, the media and the public on the safety significance of events occurring at nuclear installations. The scale was refined in 1992 in the light of experience gained and extended to be applicable to any event associated with radioactive material and/or radiation, including the transport of radioactive materials.This edition of the INES User's Manual incorporates experience gained from applying the 1992 version of the scale and the document entitled 'Clarification of Issues Raised'. As such, it replaces those earlier publications. It does not amend the technical basis of the INES rating procedure but is expected to facilitate the task of those who are required to rate the safety significance of events using the INES scale. The INES communication network currently receives and disseminates event information to the INES National Officers of 60 Member States on special Event Rating Forms which represent official information on the events, including the rating. The INES communication process has led each participating country to set up an internal network which ensures that all events are promptly communicated and rated whenever they have to be reported outside or inside the country. The IAEA provides training services on the use of INES on request.

  16. Relating to the Experience of Contingency in Patients With Advanced Cancer: An Interview Study in U.S. Patients.

    Science.gov (United States)

    Kruizinga, Renske; Jafari, Najmeh; Scherer-Rath, Michael; Schilderman, Hans; Bires, Jennifer; Puchalski, Christina; van Laarhoven, Hanneke

    2018-03-01

    Being diagnosed with incurable cancer can be a life-changing experience, evoking different spiritual questions and needs. Confronting a serious life-threatening event occurs not only often unexpected but also can disrupt a person's self-image and ideals of their personhood. This confrontation makes it difficult for people to integrate it into their personal life story-otherwise referred to as an experience of contingency. Different modes of relating to the contingent life event of having cancer have been studied in a Dutch patient population. Here we present an interview study in an U.S. population with advanced cancer patients. We included eight American patients with advanced cancer from the George Washington University Cancer Center. All patients were interviewed twice discussing their life events and life goals using a semistructured interview model. All interviews were transcribed and analyzed focusing on how patients described the way they related to the experience of having advanced cancer. The constant comparative method with a directed content analysis approach was used to code the themes in the interviews. The analyses show that the four modes of relating to contingency that we found in the Dutch study population can also be found in an American advanced cancer patient population. Differences were found in the extended way American patients described the fourth mode of "receiving." This study ensures a broader and deeper understanding of relating to the experience of contingency in having incurable cancer, which is crucial in developing accurate spiritual care in the palliative phase of patients. Copyright © 2017 American Academy of Hospice and Palliative Medicine. Published by Elsevier Inc. All rights reserved.

  17. 10 CFR 72.184 - Safeguards contingency plan.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Safeguards contingency plan. 72.184 Section 72.184 Energy... Protection § 72.184 Safeguards contingency plan. (a) The requirements of the licensee's safeguards contingency plan for responding to threats and radiological sabotage must be as defined in appendix C to part...

  18. External Events Excluding Earthquakes in the Design of Nuclear Power Plants. Safety Guide

    International Nuclear Information System (INIS)

    2008-01-01

    This Safety Guide provides recommendations and guidance on design for the protection of nuclear power plants from the effects of external events (excluding earthquakes), i.e. events that originate either off the site or within the boundaries of the site but from sources that are not directly involved in the operational states of the nuclear power plant units. In addition, it provides recommendations on engineering related matters in order to comply with the safety objectives and requirements established in the IAEA Safety Requirements publication, Safety of Nuclear Power Plants: Design. It is also applicable to the design and safety assessment of items important to the safety of land based stationary nuclear power plants with water cooled reactors. Contents: 1. Introduction; 2. Application of safety criteria to the design; 3. Design basis for external events; 4. Aircraft crash; 5. External fire; 6. Explosions; 7. Asphyxiant and toxic gases; 8. Corrosive and radioactive gases and liquids; 9. Electromagnetic interference; 10. Floods; 11. Extreme winds; 12. Extreme meteorological conditions; 13. Biological phenomena; 14. Volcanism; 15. Collisions of floating bodies with water intakes and UHS components; Annex I: Aircraft crashes; Annex II: Detonation and deflagration; Annex III: Toxicity limits.

  19. INES: The International Nuclear and Radiological Event Scale User's Manual. 2008 Edition (Spanish Edition)

    International Nuclear Information System (INIS)

    2010-11-01

    INES, the International Nuclear and Radiological Event Scale, was developed in 1990 by experts convened by the IAEA and the OECD Nuclear Energy Agency with the aim of communicating the safety significance of events. This edition of the INES User?s Manual is designed to facilitate the task of those who are required to rate the safety significance of events using the scale. It includes additional guidance and clarifications, and provides examples and comments on the continued use of INES. With this new edition, it is anticipated that INES will be widely used by Member States and become the worldwide scale for putting into proper perspective the safety significance of any event associated with the transport, storage and use of radioactive material and radiation sources, whether or not the event occurs at a facility.

  20. INES: The International Nuclear and Radiological Event Scale User's Manual. 2008 Edition (Chinese Edition)

    International Nuclear Information System (INIS)

    2012-01-01

    INES, the International Nuclear and Radiological Event Scale, was developed in 1990 by experts convened by the IAEA and the OECD Nuclear Energy Agency with the aim of communicating the safety significance of events. This edition of the INES User's Manual is designed to facilitate the task of those who are required to rate the safety significance of events using the scale. It includes additional guidance and clarifications, and provides examples and comments on the continued use of INES. With this new edition, it is anticipated that INES will be widely used by Member States and become the worldwide scale for putting into proper perspective the safety significance of any event associated with the transport, storage and use of radioactive material and radiation sources, whether or not the event occurs at a facility.

  1. Psychophysics of associative learning: Quantitative properties of subjective contingency.

    Science.gov (United States)

    Maia, Susana; Lefèvre, Françoise; Jozefowiez, Jérémie

    2018-01-01

    Allan and collaborators (Allan, Hannah, Crump, & Siegel, 2008; Allan, Siegel, & Tangen, 2005; Siegel, Allan, Hannah, & Crump, 2009) recently proposed to apply signal detection theory to the analysis of contingency judgment tasks. When exposed to a flow of stimuli, participants are asked to judge whether there is a contingent relation between a cue and an outcome, that is, whether the subjective cue-outcome contingency exceeds a decision threshold. In this context, we tested the following hypotheses regarding the relation between objective and subjective cue-outcome contingency: (a) The underlying distributions of subjective cue-outcome contingency are Gaussian; (b) The mean distribution of subjective contingency is a linear function of objective cue-outcome contingency; and (c) The variance in the distribution of subjective contingency is constant. The hypotheses were tested by combining a streamed-trial contingency assessment task with a confidence rating procedure. Participants were exposed to rapid flows of stimuli at the end of which they had to judge whether an outcome was more (Experiment 1) or less (Experiment 2) likely to appear following a cue and how sure they were of their judgment. We found that although Hypothesis A seems reasonable, Hypotheses B and C were not. Regarding Hypothesis B, participants were more sensitive to positive than to negative contingencies. Regarding Hypothesis C, the perceived cue-outcome contingency became more variable when the contingency became more positive or negative, but only to a slight extent. (PsycINFO Database Record (c) 2018 APA, all rights reserved).

  2. A review for identification of initiating events in event tree development process on nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Riyadi, Eko H., E-mail: e.riyadi@bapeten.go.id [Center for Regulatory Assessment of Nuclear Installation and Materials, Nuclear Energy Regulatory Agency (BAPETEN), Jl. Gajah Mada 8 Jakarta 10120 (Indonesia)

    2014-09-30

    Initiating event is defined as any event either internal or external to the nuclear power plants (NPPs) that perturbs the steady state operation of the plant, if operating, thereby initiating an abnormal event such as transient or loss of coolant accident (LOCA) within the NPPs. These initiating events trigger sequences of events that challenge plant control and safety systems whose failure could potentially lead to core damage or large early release. Selection for initiating events consists of two steps i.e. first step, definition of possible events, such as by evaluating a comprehensive engineering, and by constructing a top level logic model. Then the second step, grouping of identified initiating event's by the safety function to be performed or combinations of systems responses. Therefore, the purpose of this paper is to discuss initiating events identification in event tree development process and to reviews other probabilistic safety assessments (PSA). The identification of initiating events also involves the past operating experience, review of other PSA, failure mode and effect analysis (FMEA), feedback from system modeling, and master logic diagram (special type of fault tree). By using the method of study for the condition of the traditional US PSA categorization in detail, could be obtained the important initiating events that are categorized into LOCA, transients and external events.

  3. Measuring Risk Aversion for Nuclear Power Plant Accident: Results of Contingent Valuation Survey in Korea

    International Nuclear Information System (INIS)

    Lee, Sang Hun; Kang, Hyun Gook

    2015-01-01

    Within the evaluation of the external cost of nuclear energy, the estimation of the external cost of nuclear power plant (NPP) severe accident is one of the major topics to be addressed. For the evaluation of the external cost of NPP severe accident, the effect of public risk averse behavior against the group accidents, such as NPP accident, dam failure, must be addressed. Although the equivalent fatalities from a single group accident are not common and its risk is very small compared to other accidents, people perceive the group accident more seriously. In other words, people are more concerned about low probability/high consequence events than about high probability/low consequence events having the same mean damage. One of the representative method to integrate the risk aversion in the external costs of severe nuclear reactor accidents was developed by Eeckoudt et al., and he used the risk aversion coefficient, mainly based on the analysis of financial risks in the stock markets to evaluate the external cost of nuclear severe accident. However, the use of financial risk aversion coefficient to nuclear severe accidents is not appropriate, because financial risk and nuclear severe accident risk are entirely different. In this paper, the individual-level survey was conducted to measure the risk aversion coefficient and estimate the multiplication factor to integrate the risk aversion in the external costs of NPP severe accident. This study propose an integrated framework on estimation of the external cost associated with severe accidents of NPP considering public risk aversion behavior. The theoretical framework to estimate the risk aversion coefficient/multiplication factor and to assess economic damages from a hypothetical NPP accident was constructed. Based on the theoretical framework, the risk aversion coefficient can be analyzed by conducting public survey with a carefully designed lottery questions. Compared to the previous studies on estimation of the

  4. Measuring Risk Aversion for Nuclear Power Plant Accident: Results of Contingent Valuation Survey in Korea

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Sang Hun; Kang, Hyun Gook [KAIST, Daejeon (Korea, Republic of)

    2015-05-15

    Within the evaluation of the external cost of nuclear energy, the estimation of the external cost of nuclear power plant (NPP) severe accident is one of the major topics to be addressed. For the evaluation of the external cost of NPP severe accident, the effect of public risk averse behavior against the group accidents, such as NPP accident, dam failure, must be addressed. Although the equivalent fatalities from a single group accident are not common and its risk is very small compared to other accidents, people perceive the group accident more seriously. In other words, people are more concerned about low probability/high consequence events than about high probability/low consequence events having the same mean damage. One of the representative method to integrate the risk aversion in the external costs of severe nuclear reactor accidents was developed by Eeckoudt et al., and he used the risk aversion coefficient, mainly based on the analysis of financial risks in the stock markets to evaluate the external cost of nuclear severe accident. However, the use of financial risk aversion coefficient to nuclear severe accidents is not appropriate, because financial risk and nuclear severe accident risk are entirely different. In this paper, the individual-level survey was conducted to measure the risk aversion coefficient and estimate the multiplication factor to integrate the risk aversion in the external costs of NPP severe accident. This study propose an integrated framework on estimation of the external cost associated with severe accidents of NPP considering public risk aversion behavior. The theoretical framework to estimate the risk aversion coefficient/multiplication factor and to assess economic damages from a hypothetical NPP accident was constructed. Based on the theoretical framework, the risk aversion coefficient can be analyzed by conducting public survey with a carefully designed lottery questions. Compared to the previous studies on estimation of the

  5. Anatomy of event and human performance management in nuclear power plants

    International Nuclear Information System (INIS)

    Wang Jinhua

    2014-01-01

    This article analyzes the occurrence mechanism of events in nuclear power plants, and explains the four factors of human errors and the relations among them, then probes into the occurrence mechanism and characteristics of human errors in nuclear power plants. Moreover, the article clarifies that the principle of human performance training in nuclear power plants is all-member training, and that the implementation approach is to develop different human performance tools for different staff categories as workers, knowledge workers and supervisors, which are categorized based on characteristics of work of different staff. (author)

  6. An overview of the insurance of nuclear power plants

    International Nuclear Information System (INIS)

    Tannion, T.

    2011-01-01

    Insurance is the transfer of financial risk. It is used to offset losses on the happening of a contingent and uncertain event. It is, in effect, the transfer of the financial risk of a loss, from one entity to another, in exchange for the payment of a premium. In the interest of brevity, this paper does not address the issue of civil liabilities applying to the operation of nuclear power plants and arising out of the Paris or Vienna Conventions or any of the protocols thereto. For detailed information on these, please refer to the IAEA or WNA web sites. (Author)

  7. The fate and importance of radionuclides produced in nuclear events

    Energy Technology Data Exchange (ETDEWEB)

    Shore, B; Anspaugh, L; Chertok, R; Gofman, J; Harrison, F; Heft, R; Koranda, J; Ng, Y; Phelps, P; Potter, G; Tamplin, A [Lawrence Radiation Laboratory, University of California, Livermore, CA (United States)

    1969-07-01

    Some of the major program at the Bio-Medical Division concerned with the fate and importance of the fission products, the radionuclides induced in the device materials, the radionuclides induced in the environment surrounding the device, and the tritium produced in Plowshare cratering events will be discussed. These programs include (1) critical unknowns in predicting organ and body burdens from radionuclides produced in cratering events; (2) the analysis with a high-resolution solid state gamma ray spectrometer of radionuclides in complex biological and environmental samples; (3) the characterization of radioactive particles from cratering detonation; (4) the biological availability to beagles, pigs and goats of radionuclides in Plowshare debris; (5) the biological availability to aquatic animals of radionuclides in Plowshare and other nuclear debris and the biological turnover of critical nuclides in specific aquatic animals; (6) the biological availability of Plowshare and other nuclear debris radionuclides to dairy cows and the transplacental transport of debris radionuclides in the dairy cow; (7) the persistence and behavior of radionuclides, particularly tritium, at sites of Plowshare and other nuclear detonations; and (8) somatic effects of Low Dose Radiation: Chromosome studies. (author)

  8. The fate and importance of radionuclides produced in nuclear events

    International Nuclear Information System (INIS)

    Shore, B.; Anspaugh, L.; Chertok, R.; Gofman, J.; Harrison, F.; Heft, R.; Koranda, J.; Ng, Y.; Phelps, P.; Potter, G.; Tamplin, A.

    1969-01-01

    Some of the major program at the Bio-Medical Division concerned with the fate and importance of the fission products, the radionuclides induced in the device materials, the radionuclides induced in the environment surrounding the device, and the tritium produced in Plowshare cratering events will be discussed. These programs include (1) critical unknowns in predicting organ and body burdens from radionuclides produced in cratering events; (2) the analysis with a high-resolution solid state gamma ray spectrometer of radionuclides in complex biological and environmental samples; (3) the characterization of radioactive particles from cratering detonation; (4) the biological availability to beagles, pigs and goats of radionuclides in Plowshare debris; (5) the biological availability to aquatic animals of radionuclides in Plowshare and other nuclear debris and the biological turnover of critical nuclides in specific aquatic animals; (6) the biological availability of Plowshare and other nuclear debris radionuclides to dairy cows and the transplacental transport of debris radionuclides in the dairy cow; (7) the persistence and behavior of radionuclides, particularly tritium, at sites of Plowshare and other nuclear detonations; and (8) somatic effects of Low Dose Radiation: Chromosome studies. (author)

  9. 48 CFR 225.7303-4 - Contingent fees.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Contingent fees. 225.7303....7303-4 Contingent fees. (a) Except as provided in paragraph (b) of this subsection, contingent fees are generally allowable under DoD contracts, provided— (1) The fees are paid to a bona fide employee or a bona...

  10. Indemnification of Damage in the Event of a Nuclear Accident

    International Nuclear Information System (INIS)

    2006-01-01

    The Second International Workshop on the Indemnification of Nuclear Damage was held in Bratislava, Slovak Republic, from 18 to 20 May 2005. The workshop was co-organised by the OECD Nuclear Energy Agency and the Nuclear Regulatory Authority of the Slovak Republic. It attracted wide participation from national nuclear authorities, regulators, operators of nuclear installations, nuclear insurers and international organisations. The purpose of the workshop was to assess the third party liability and compensation mechanisms that would be implemented by participating countries in the event of a nuclear accident taking place within or near their borders. To accommodate this objective, two fictitious accident scenarios were developed: one involving a fire in a nuclear installation located in the Slovak Republic and resulting in the release of significant amounts of radioactive materials off-site, and the other a fire on board a ship transporting enriched uranium hexafluoride along the Danube River. The first scenario was designed to involve the greatest possible number of countries, with the second being restricted to countries with a geographical proximity to the Danube. These proceedings contain the papers presented at the workshop, as well as reports on the discussion sessions held. (author)

  11. The External Cost Evaluation of the Nuclear Severe Accident Using CVM

    International Nuclear Information System (INIS)

    Lee, Yong Suk; Lee, Byung Chul

    2006-01-01

    The external cost of energy can be defined as 'the cost not included in the energy market price', such as air pollution, noise, etc. Within the evaluation of the external cost of nuclear energy, the estimation of the external cost of severe accident is one of the major topics to be addressed. For the evaluation of the external cost of severe accident, the effect of risk aversion of the public against the severe accident must be addressed, because people are more concerned about low probability - high consequence events than about high probability - low consequence events having the same mean damage. It is generally recognized that there is a discrepancy between the social acceptability of the risk and the average monetary value which corresponds in principle to the compensation of the consequences for each individual of the population affected by the accident. In this paper, the CVM (Contingent Valuation Method) is used to integrate the risk aversion in the external costs of nuclear severe accidents in Korea

  12. The Role of the Rat Medial Prefrontal Cortex in Adapting to Changes in Instrumental Contingency

    Science.gov (United States)

    Coutureau, Etienne; Esclassan, Frederic; Di Scala, Georges; Marchand, Alain R.

    2012-01-01

    In order to select actions appropriate to current needs, a subject must identify relationships between actions and events. Control over the environment is determined by the degree to which action consequences can be predicted, as described by action-outcome contingencies – i.e. performing an action should affect the probability of the outcome. We evaluated in a first experiment adaptation to contingency changes in rats with neurotoxic lesions of the medial prefrontal cortex. Results indicate that this brain region is not critical to adjust instrumental responding to a negative contingency where the rats must refrain from pressing a lever, as this action prevents reward delivery. By contrast, this brain region is required to reduce responding in a non-contingent situation where the same number of rewards is freely delivered and actions do not affect the outcome any more. In a second experiment, we determined that this effect does not result from a different perception of temporal relationships between actions and outcomes since lesioned rats adapted normally to gradually increasing delays in reward delivery. These data indicate that the medial prefrontal cortex is not directly involved in evaluating the correlation between action-and reward-rates or in the perception of reward delays. The deficit in lesioned rats appears to consist of an abnormal response to the balance between contingent and non-contingent rewards. By highlighting the role of prefrontal regions in adapting to the causal status of actions, these data contribute to our understanding of the neural basis of choice tasks. PMID:22496747

  13. Thoughts Without Content are Empty, Intuitions Without Concepts are Blind - Determinism and Contingency Revisited

    Science.gov (United States)

    Pohorille, Andrew

    2011-01-01

    Was the emergence of life a predictable outcome of chemical evolution on earth? Could evolution produce life very different from ours? These are one of the oldest questions in the field of the origin of life that not only have broad philosophical implications but also impact how we approach the problem from the methodological standpoint. Framing the issue in terms of the dichotomy between contingency and determinism is not a fortunate because these two terms in their conventional meaning are neither mutually exclusive nor jointly exhaustive. Determinism, represented in natural sciences by Newtonian physics, relies on the assumption that every event is causally determined by a chain of previous events. In the context of the origin of life it means that once the initial conditions on the early earth have been specified further evolution follows inevitably. Considering uncertainties about conditions on the prebiotic earth, many plausible sets of initial conditions can be defined, each followed by a separate deterministic trajectory. This conventional understanding of determinism does not admit contingency. Further, it has no implications for evaluating how many sets of initial conditions lead to the emergence of life. It appears that a better framing of the problem is as follows: given plausible sets of initial conditions on the early earth how probable and broadly spread are evolutionary trajectories that lead to life? Instead of undertaking an impossible task of specifying microscopic initial conditions for all components of the system one uses a reduced representation of this system and specify only a small set of essential macroscopic parameters, values (or ranges of values) of which can be identified, inferred or estimated from experiment, theory or historical record. The following evolutionary trajectories are still governed by laws of physics and chemistry but become probabilistic and "contingency" is admitted as variations in other variables in the system. A

  14. Meteorological events in site evaluation for nuclear power plants. Safety guide

    International Nuclear Information System (INIS)

    2005-01-01

    This Safety Guide provides recommendations and guidance on conducting hazard assessments of extreme and rare meteorological phenomena. It is of interest to safety assessors and regulators involved in the licensing process as well as to designers of nuclear power plants. This Safety Guide was prepared under the IAEA programme for safety standards for nuclear power plants. It supplements the IAEA Safety Requirements publication on Site Evaluation for Nuclear Facilities which is to supersede the Code on the Safety of Nuclear Power Plants: Siting, Safety Series No. 50-C-S (Rev. 1), IAEA, Vienna (1988). The present Safety Guide supersedes two earlier Safety Guides: Safety Series No. 50-SG-S11A (1981) on Extreme Meteorological Events in Nuclear Power Plant Siting, Excluding Tropical Cyclones and Safety Series No. 50-SG-S11B (1984) on Design Basis Tropical Cyclone for Nuclear Power Plants. The purpose of this Safety Guide is to provide recommendations and guidance on conducting hazard assessments of extreme and rare meteorological phenomena. This Safety Guide provides interpretation of the Safety Requirements publication on Site Evaluation for Nuclear Facilities and guidance on how to fulfil these requirements. It is aimed at safety assessors or regulators involved in the licensing process as well as designers of nuclear power plants, and provides them with guidance on the methods and procedures for analyses that support the assessment of the hazards associated with extreme and rare meteorological events. This Safety Guide discusses the extreme values of meteorological variables and rare meteorological phenomena, as well as their rates of occurrence, according to the following definitions: (a) Extreme values of meteorological variables such as air temperature and wind speed characterize the meteorological or climatological environment. And (b) Rare meteorological phenomena

  15. 40 CFR 264.51 - Purpose and implementation of contingency plan.

    Science.gov (United States)

    2010-07-01

    ... contingency plan. 264.51 Section 264.51 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 264.51 Purpose and implementation of contingency plan. (a) Each owner or operator must have a contingency plan for his facility. The contingency...

  16. Contingency Theories of Leadership: A Study.

    Science.gov (United States)

    Saha, Sunhir K.

    1979-01-01

    Some of the major contingency theories of leadership are reviewed; some results from the author's study of Fiedler's contingency model are reported; and some thoughts for the future of leadership research are provided. (Author/MLF)

  17. Contingency Management of Health Care Organizations: It Depends.

    Science.gov (United States)

    Olden, Peter C

    Managers in health care organizations (HCOs) must perform many processes and activities, such as planning goals, designing organization structure, leading people, motivating employees, making decisions, and resolving conflict. How they do all this strongly affects the performance and outcomes of their organizations and themselves. Some managers develop a usual way of performing their jobs and achieve some success with a preferred method of leading or a favorite approach to motivating. However, their success will be limited if they always rely on a standard "1-size-fits-all" approach. This is because contingency factors influence the effectiveness of a given approach to managing. The "best" approach depends on contingency factors, including the situation and the people involved. Managers should choose an approach to fit with the changing contingency factors. This article explains why and how managers should develop a contingency approach to managing HCOs. The development of contingency theory is briefly described. Practical application of contingency management is explained for leading, motivating, decision making, and resolving conflict. By using a contingency approach, managers can be more effective when managing their HCOs.

  18. [Contingencies of self-worth in Japanese culture: validation of the Japanese contingencies of self-worth scale].

    Science.gov (United States)

    Uchida, Yukiko

    2008-08-01

    The author developed a Japanese version of the Contingencies of Self-Worth Scale (CSWS) that was originally developed in the United States (Crocker, Luhtanen, Cooper, & Bouvrette, 2003). The Japanese version of the scale measures seven contingencies of self-esteem: Defeating others in competition, appearance, relationship harmony, other's approval, academic competence, virtue, and support of family and friends. Scores on the scale had systematic relationships with related variables, and the scale therefore exhibited satisfactory levels of construct validity: Relationship harmony, other's approval, and support of family and friends were positively correlated with sympathy and interdependence, whereas competitiveness was negatively correlated with sympathy. Moreover, competitiveness and academic achievement contingencies predicted competitive motivation, whereas the support of family and friends contingency predicted self-sufficient motivation. The scale has adequate test-retest reliability and a seven-factor structural model was confirmed. The implications for self-esteem and interpersonal relationships in Japanese culture are discussed.

  19. Inevitability, contingency, and epistemic humility.

    Science.gov (United States)

    Kidd, Ian James

    2016-02-01

    This paper offers an epistemological framework for the debate about whether the results of scientific enquiry are inevitable or contingent. I argue in Sections 2 and 3 that inevitabilist stances are doubly guilty of epistemic hubris--a lack of epistemic humility--and that the real question concerns the scope and strength of our contingentism. The latter stages of the paper-Sections 4 and 5-address some epistemological and historiographical worries and sketch some examples of deep contingencies to guide further debate. I conclude by affirming that the concept of epistemic humility can usefully inform critical reflection on the contingency of the sciences and the practice of history of science. Copyright © 2015 Elsevier Ltd. All rights reserved.

  20. Achieving world's highest level of nuclear safety learning from overseas nuclear trouble events

    International Nuclear Information System (INIS)

    Okumoto, Masaru

    2014-01-01

    Nuclear Information Research Project of Institute of Nuclear Safety System, Incorporated (INSS) had acquired trouble information of nuclear power plants (NPPs) up to annual several thousand events issued by overseas regulatory agencies for more than 20 years since INSS established and analyzed it in details respectively after the screening. Lessons extracted from the analysis were offered as suggestions to electric utilities having PWRs in Japan. Such activities would surely contribute to maintain and improve nuclear safety with no objection. However, they could not prevent the occurrence of accident of Fukushima Daiichi NPPs. Thus the project had reviewed usefulness of past activities and how improved could be by listening sincerely to outside opinions. This report introduced outlines of recent activities. Competent suggestions to electric utilities might be made with improved reflection of lessons to needed rules, deepened information sharing within the project and raised awareness of the problem. (T. Tanaka)

  1. Canadian nuclear power principles for beyond design basis events - supporting rationale

    International Nuclear Information System (INIS)

    Elliott, M.; Newman, G.; Bhaloo, A.

    2014-01-01

    The development of the following principles and their rationale began during a special Chief Nuclear Engineers forum held on March 25th, 2013 in Toronto. These principles are intended to provide guidance to the Canadian Nuclear Power Industry in developing responses to the lessons learned from the Fukushima event of March 2011. These principles were accepted and signed off by the Chief Nuclear Officers of each of the three utilities in August 2013 and were presented to the CNSC at a public hearing on August 21, 2013. This document provides the underlying rationale for the principles. (author)

  2. Canadian nuclear power principles for beyond design basis events - supporting rationale

    Energy Technology Data Exchange (ETDEWEB)

    Elliott, M. [OPG Nuclear, Ontario (Canada); Newman, G. [Bruce Power, Ontario (Canada); Bhaloo, A. [New Brunswick Power, New Brunswick (Canada)

    2014-09-15

    The development of the following principles and their rationale began during a special Chief Nuclear Engineers forum held on March 25th, 2013 in Toronto. These principles are intended to provide guidance to the Canadian Nuclear Power Industry in developing responses to the lessons learned from the Fukushima event of March 2011. These principles were accepted and signed off by the Chief Nuclear Officers of each of the three utilities in August 2013 and were presented to the CNSC at a public hearing on August 21, 2013. This document provides the underlying rationale for the principles. (author)

  3. Canadian nuclear power principles for beyond design basis events - supporting rationale

    Energy Technology Data Exchange (ETDEWEB)

    Elliott, M. [Ontario Power Generation Nuclear, Pickering, ON (Canada); Newman, G. [Bruce Power, Tiverton, ON (Canada); Bhaloo, A. [New Brunswick Power, Fredericton, NB (Canada)

    2014-07-01

    The development of the following principles and their rationale began during a special Chief Nuclear Engineers forum held on March 25th, 2013 in Toronto. These principles are intended to provide guidance to the Canadian Nuclear Power Industry in developing responses to the lessons learned from the Fukushima event of March 2011. These principles were accepted and signed off by the Chief Nuclear Officers of each of the three utilities in August 2013 and were presented to the CNSC at a public hearing on August 21, 2013. This document provides the underlying rationale for the principles. (author)

  4. 48 CFR 1318.201 - Contingency operation.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contingency operation. 1318.201 Section 1318.201 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE CONTRACTING METHODS AND CONTRACT TYPES EMERGENCY ACQUISITIONS Emergency Acquisition Flexibilities 1318.201 Contingency...

  5. 7 CFR 457.9 - Appropriation contingency.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Appropriation contingency. 457.9 Section 457.9 Agriculture Regulations of the Department of Agriculture (Continued) FEDERAL CROP INSURANCE CORPORATION, DEPARTMENT OF AGRICULTURE COMMON CROP INSURANCE REGULATIONS § 457.9 Appropriation contingency...

  6. Relative speed of processing determines color-word contingency learning.

    Science.gov (United States)

    Forrin, Noah D; MacLeod, Colin M

    2017-10-01

    In three experiments, we tested a relative-speed-of-processing account of color-word contingency learning, a phenomenon in which color identification responses to high-contingency stimuli (words that appear most often in particular colors) are faster than those to low-contingency stimuli. Experiment 1 showed equally large contingency-learning effects whether responding was to the colors or to the words, likely due to slow responding to both dimensions because of the unfamiliar mapping required by the key press responses. For Experiment 2, participants switched to vocal responding, in which reading words is considerably faster than naming colors, and we obtained a contingency-learning effect only for color naming, the slower dimension. In Experiment 3, previewing the color information resulted in a reduced contingency-learning effect for color naming, but it enhanced the contingency-learning effect for word reading. These results are all consistent with contingency learning influencing performance only when the nominally irrelevant feature is faster to process than the relevant feature, and therefore are entirely in accord with a relative-speed-of-processing explanation.

  7. What constitutes vulnerable self-esteem? Comparing the prospective effects of low, unstable, and contingent self-esteem on depressive symptoms.

    Science.gov (United States)

    Sowislo, Julia Friederike; Orth, Ulrich; Meier, Laurenz L

    2014-11-01

    A growing body of longitudinal studies suggests that low self-esteem is a risk factor for depression. However, it is unclear whether other characteristics of self-esteem, besides its level, explain incremental or even greater variance in subsequent depression. We examined the prospective effects of self-esteem level, instability (i.e., the degree of variability in self-esteem across short periods), and contingency (i.e., the degree to which self-esteem fluctuates in response to self-relevant events) on depressive symptoms in 1 overarching model, using data from 2 longitudinal studies. In Study 1, 372 adults were assessed at 2 waves over 6 months, including 40 daily diary assessments at Wave 1. In Study 2, 235 young adults were assessed at 2 waves over 6 weeks, including about 6 daily diary assessments at each wave. Self-esteem contingency was measured by self-report and by a statistical index based on the diary data (capturing event-related fluctuations in self-esteem). In both studies self-esteem level, but not self-esteem contingency, predicted subsequent depressive symptoms. Self-esteem instability predicted subsequent depressive symptoms in Study 2 only, with a smaller effect size than self-esteem level. Also, level, instability, and contingency of self-esteem did not interact in the prediction of depressive symptoms. Moreover, the effect of self-esteem level held when controlling for neuroticism and for all other Big Five personality traits. Thus, the findings provide converging evidence for a vulnerability effect of self-esteem level, tentative evidence for a smaller vulnerability effect of self-esteem instability, and no evidence for a vulnerability effect of self-esteem contingency.

  8. Tethered Satellite System Contingency Investigation Board

    Science.gov (United States)

    1992-11-01

    The Tethered Satellite System (TSS-1) was launched aboard the Space Shuttle Atlantis (STS-46) on July 31, 1992. During the attempted on-orbit operations, the Tethered Satellite System failed to deploy successfully beyond 256 meters. The satellite was retrieved successfully and was returned on August 6, 1992. The National Aeronautics and Space Administration (NASA) Associate Administrator for Space Flight formed the Tethered Satellite System (TSS-1) Contingency Investigation Board on August 12, 1992. The TSS-1 Contingency Investigation Board was asked to review the anomalies which occurred, to determine the probable cause, and to recommend corrective measures to prevent recurrence. The board was supported by the TSS Systems Working group as identified in MSFC-TSS-11-90, 'Tethered Satellite System (TSS) Contingency Plan'. The board identified five anomalies for investigation: initial failure to retract the U2 umbilical; initial failure to flyaway; unplanned tether deployment stop at 179 meters; unplanned tether deployment stop at 256 meters; and failure to move tether in either direction at 224 meters. Initial observations of the returned flight hardware revealed evidence of mechanical interference by a bolt with the level wind mechanism travel as well as a helical shaped wrap of tether which indicated that the tether had been unwound from the reel beyond the travel by the level wind mechanism. Examination of the detailed mission events from flight data and mission logs related to the initial failure to flyaway and the failure to move in either direction at 224 meters, together with known preflight concerns regarding slack tether, focused the assessment of these anomalies on the upper tether control mechanism. After the second meeting, the board requested the working group to complete and validate a detailed integrated mission sequence to focus the fault tree analysis on a stuck U2 umbilical, level wind mechanical interference, and slack tether in upper tether

  9. Event Investigation

    International Nuclear Information System (INIS)

    Korosec, D.

    2000-01-01

    The events in the nuclear industry are investigated from the license point of view and from the regulatory side too. It is well known the importance of the event investigation. One of the main goals of such investigation is to prevent the circumstances leading to the event and the consequences of the event. The protection of the nuclear workers against nuclear hazard, and the protection of general public against dangerous effects of an event could be achieved by systematic approach to the event investigation. Both, the nuclear safety regulatory body and the licensee shall ensure that operational significant events are investigated in a systematic and technically sound manner to gather information pertaining to the probable causes of the event. One of the results should be appropriate feedback regarding the lessons of the experience to the regulatory body, nuclear industry and general public. In the present paper a general description of systematic approach to the event investigation is presented. The systematic approach to the event investigation works best where cooperation is present among the different divisions of the nuclear facility or regulatory body. By involving management and supervisors the safety office can usually improve their efforts in the whole process. The end result shall be a program which serves to prevent events and reduce the time and efforts solving the root cause which initiated each event. Selection of the proper method for the investigation and an adequate review of the findings and conclusions lead to the higher level of the overall nuclear safety. (author)

  10. Contingency learning in human fear conditioning involves the ventral striatum.

    Science.gov (United States)

    Klucken, Tim; Tabbert, Katharina; Schweckendiek, Jan; Merz, Christian Josef; Kagerer, Sabine; Vaitl, Dieter; Stark, Rudolf

    2009-11-01

    The ability to detect and learn contingencies between fearful stimuli and their predictive cues is an important capacity to cope with the environment. Contingency awareness refers to the ability to verbalize the relationships between conditioned and unconditioned stimuli. Although there is a heated debate about the influence of contingency awareness on conditioned fear responses, neural correlates behind the formation process of contingency awareness have gained only little attention in human fear conditioning. Recent animal studies indicate that the ventral striatum (VS) could be involved in this process, but in human studies the VS is mostly associated with positive emotions. To examine this question, we reanalyzed four recently published classical fear conditioning studies (n = 117) with respect to the VS at three distinct levels of contingency awareness: subjects, who did not learn the contingencies (unaware), subjects, who learned the contingencies during the experiment (learned aware) and subjects, who were informed about the contingencies in advance (instructed aware). The results showed significantly increased activations in the left and right VS in learned aware compared to unaware subjects. Interestingly, this activation pattern was only found in learned but not in instructed aware subjects. We assume that the VS is not involved when contingency awareness does not develop during conditioning or when contingency awareness is unambiguously induced already prior to conditioning. VS involvement seems to be important for the transition from a contingency unaware to a contingency aware state. Implications for fear conditioning models as well as for the contingency awareness debate are discussed.

  11. Intelligent decision aids for abnormal events in nuclear power plants

    International Nuclear Information System (INIS)

    Kafka, P.; Polke, H.

    1988-01-01

    German nuclear power plants are characterized by a high degree of automation, not only for normal operation but also for abnormal events. Therefore the role of the operating personnel is mainly a supervisory function. Nevertheless, for a spectrum of unexpected events the operating personnel have to react with manual recovery actions. In order to minimize human error in such recovery actions, different kinds of intelligent decision aid support the operators today. In this paper such aids are discussed and one of them is described in more detail. (author)

  12. 40 CFR 264.227 - Emergency repairs; contingency plans.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Emergency repairs; contingency plans... FACILITIES Surface Impoundments § 264.227 Emergency repairs; contingency plans. (a) A surface impoundment... days after detecting the problem. (c) As part of the contingency plan required in subpart D of this...

  13. Views on ASSET guidelines from event 'T5' of Daya Bay Nuclear Power Station

    International Nuclear Information System (INIS)

    Hao Xiaofeng

    1997-01-01

    The event assessment methodology adopted by ASSET (Assessment of Safety Significant Events Team) of IAEA, and event 'T5' (abnormal control rod drop time) occurred in Daya Bay Nuclear Power Station, including the causes and the corrective actions are briefly presented. The assessment of the event is performed by using the ASSET methodology, some advantages and limits of the methodology in practice are pointed out

  14. Hydrogeologic effects of natural disruptive events on nuclear waste repositories

    International Nuclear Information System (INIS)

    Davis, S.N.

    1980-06-01

    Some possible hydrogeologic effects of disruptive events that may affect repositories for nuclear waste are described. A very large number of combinations of natural events can be imagined, but only those events which are judged to be most probable are covered. Waste-induced effects are not considered. The disruptive events discussed above are placed into four geologic settings. Although the geology is not specific to given repository sites that have been considered by other agencies, the geology has been generalized from actual field data and is, therefore, considered to be physically reasonable. The geologic settings considered are: (1) interior salt domes of the Gulf Coast, (2) bedded salt of southeastern New Mexico, (3) argillaceous rocks of southern Nevanda, and (4) granitic stocks of the Basin and Range Province. Log-normal distributions of permeabilities of rock units are given for each region. Chapters are devoted to: poresity and permeability of natural materials, regional flow patterns, disruptive events (faulting, dissolution of rock forming minerals, fracturing from various causes, rapid changes of hydraulic regimen); possible hydrologic effects of disruptive events; and hydraulic fracturing

  15. Contingent and Alternative Work Arrangements, Defined.

    Science.gov (United States)

    Polivka, Anne E.

    1996-01-01

    Discusses the definitions of contingent workers and alternative work arrangements used by the Bureau of Labor Statistics to analyze data, and presents aggregate estimates of the number of workers in each group. Discusses the overlap between contingent workers and workers in alternative arrangements. (Author/JOW)

  16. 40 CFR 51.1012 - Requirement for contingency measures.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 2 2010-07-01 2010-07-01 false Requirement for contingency measures... Implementation of PM2.5 National Ambient Air Quality Standards § 51.1012 Requirement for contingency measures... contingency measures to be undertaken if the area fails to make reasonable further progress, or fails to...

  17. Environmental impacts of radiological consequences during the anticipated transients without scram (ATWS) events in nuclear power reactors

    International Nuclear Information System (INIS)

    El-Kafas, A.A.

    2011-01-01

    Anticipated transients without scram (ATWS), is one of the (worst case) accidents could happen if the system that provides a highly reliable means of shutting down the reactor (scram system )fails to work during a reactor event (anticipated transient).It has two general characteristics: (1) Initiation by a transient anticipated to occur one or more times in the life of reactor and ,(2) Assumed to proceed without scram.The types of events considered are those used for designing the plant .The evaluation of the radiological consequences during the assessment of the nuclear events,especially ATWS in nuclear power reactors, is very essential for environmental studies and public safety. In this paper, the root cases for nuclear events and dose calculation are presented. Scenario of accident sequences together with radiological impacts is illustrated for loss of coolant accident (LOCA) for a typical pressurized water reactor nuclear power plant. Recommendations for mitigating or preventing the release of radiation and high radioactive materials to environment are presented.

  18. Zero Time of Transitory Nuclear Events Derived by Parent-Daughter Systems

    International Nuclear Information System (INIS)

    Nir-El, Y.

    2014-01-01

    The detection and identification of a nuclear event that results in the dissemination of radioactive products into the environment can be realized by dating the age of the event. In order to correct observed activities for the decay since the occurrence of the event, the age must be known to a high level of confidence. Previous papers. described the method to date the age of a nuclear event by measuring the activity of two fission products, which constitute the clock in this application. Within the proficiency test programme for radionuclide laboratories supporting the CTBT, a simulated gamma spectrum with the characteristics of an atmospheric test of a Chinese thermonuclear device, was used to determine the zero time by calculating the theoretical peak area ratio of 95Nb/95Zr. Their approach used only the main gamma lines at 766 and 757 keV and assigned the same detection efficiency to both these close lines. Their methodology of calculating the uncertainty of zero time is subject to comments because it takes the sum of two components (nuclide ratio and activity ratio as function of time) in quadrature. In another paper, the activity of 95Nb as a function of time was presented without any development or expression for the zero time. Analytical equations for zero time and the associated uncertainty calculations were derived in a recent paper using a measured activity ratio of two nuclides and illustrating the procedure by data from the Chinese test. The evaluation of the zero time uncertainty was performed by a very large set of very complicated analytical equations. The present paper aims at developing a procedure to determine the zero time and its uncertainty in a transitory nuclear event by treating a parent-daughter system of 3 nuclides, where one daughter feeds the other one, in addition to its direct feeding by the decay of the parent

  19. Three Dimensional Simulation of the Baneberry Nuclear Event

    Science.gov (United States)

    Lomov, Ilya N.; Antoun, Tarabay H.; Wagoner, Jeff; Rambo, John T.

    2004-07-01

    Baneberry, a 10-kiloton nuclear event, was detonated at a depth of 278 m at the Nevada Test Site on December 18, 1970. Shortly after detonation, radioactive gases emanating from the cavity were released into the atmosphere through a shock-induced fissure near surface ground zero. Extensive geophysical investigations, coupled with a series of 1D and 2D computational studies were used to reconstruct the sequence of events that led to the catastrophic failure. However, the geological profile of the Baneberry site is complex and inherently three-dimensional, which meant that some geological features had to be simplified or ignored in the 2D simulations. This left open the possibility that features unaccounted for in the 2D simulations could have had an important influence on the eventual containment failure of the Baneberry event. This paper presents results from a high-fidelity 3D Baneberry simulation based on the most accurate geologic and geophysical data available. The results are compared with available data, and contrasted against the results of the previous 2D computational studies.

  20. The Role of Feedback Contingency in Perceptual Category Learning

    Science.gov (United States)

    Ashby, F. Gregory; Vucovich, Lauren E.

    2016-01-01

    Feedback is highly contingent on behavior if it eventually becomes easy to predict, and weakly contingent on behavior if it remains difficult or impossible to predict even after learning is complete. Many studies have demonstrated that humans and nonhuman animals are highly sensitive to feedback contingency, but no known studies have examined how feedback contingency affects category learning, and current theories assign little or no importance to this variable. Two experiments examined the effects of contingency degradation on rule-based and information-integration category learning. In rule-based tasks, optimal accuracy is possible with a simple explicit rule, whereas optimal accuracy in information-integration tasks requires integrating information from two or more incommensurable perceptual dimensions. In both experiments, participants each learned rule-based or information-integration categories under either high or low levels of feedback contingency. The exact same stimuli were used in all four conditions and optimal accuracy was identical in every condition. Learning was good in both high-contingency conditions, but most participants showed little or no evidence of learning in either low-contingency condition. Possible causes of these effects are discussed, as well as their theoretical implications. PMID:27149393

  1. 48 CFR 1632.770 - Contingency reserve payments.

    Science.gov (United States)

    2010-10-01

    ... FINANCING Contract Funding 1632.770 Contingency reserve payments. (a) Payments from the contingency reserve... advise the carrier of its decision. However, OPM shall not unreasonably withhold approval for amounts...

  2. Root Cause Analysis Following an Event at a Nuclear Installation: Reference Manual. Companion CD

    International Nuclear Information System (INIS)

    2015-01-01

    Following an event at a nuclear installation, it is important to determine accurately its root causes so that effective corrective actions can be implemented. As stated in IAEA Safety Standards Series No. SF-1, Fundamental Safety Principles: “Processes must be put in place for the feedback and analysis of operating experience”. If this process is completed effectively, the probability of a similar event occurring is significantly reduced. Guidance on how to establish and implement such a process is given in IAEA Safety Standards Series No. NS-G-2.11, A System for the Feedback of Experience from Events in Nuclear Installations. To cater for the diverse nature of operating experience events, several different root cause analysis (RCA) methodologies and techniques have been developed for effective investigation and analysis. An event here is understood as any unanticipated sequence of occurrences that results in, or potentially results in, consequences to plant operation and safety. RCA is not a topic uniquely relevant to event investigators: knowledge of the concepts enhances the learning characteristics of the whole organization. This knowledge also makes a positive contribution to nuclear safety and helps to foster a culture of preventing event occurrence. This publication allows organizations to deepen their knowledge of these methodologies and techniques and also provides new organizations with a broad overview of the RCA process. It is the outcome of a coordinated effort involving the participation of experts from nuclear organizations, the energy industry and research centres in several Member States. This publication also complements IAEA Services Series No. 10, PROSPER Guidelines: Guidelines for Peer Review and for Plant Self- Assessment of Operational Experience Feedback Process, and is intended to form part of a suite of publications developing the principles set forth in these guidelines. In addition to the information and description of RCA

  3. INVESTIGATION OF CONTINGENCY PATTERNS OF TEACHERS’ SCAFFOLDING IN TEACHING AND LEARNING MATHEMATICS

    Directory of Open Access Journals (Sweden)

    Anwar Anwar

    2016-12-01

    Full Text Available The purpose of this study is to investigate the patterns of scaffolding contingency in teaching and learning mathematics carried out by three teachers. Contingency patterns are obtained by examining the transcription from video recording of conversation fragments between teachers and students during the provision of scaffolding. The contingency patterns are drawn in three strategies: diagnostic strategy, intervention strategy, and checking diagnosis. The result shows that the three teachers expressed different interaction contingencies in their scaffolding activities: contingent dominant, non-contingent dominant, and pseudo-contingent. It is also found that the learning interaction performed by experienced teachers tends to be contingent dominant compared to novice teachers. Keywords: Contingency, Contingent Dominant, Non-Contingent Dominant, Pseudo Contingent, Scaffolding DOI: http://dx.doi.org/10.22342/jme.8.1.3410.65-76

  4. Messiahs, pachacutis and prophets. The apocalypse or contingency discourse in Peru

    Directory of Open Access Journals (Sweden)

    Lucero de Vivanco

    2012-11-01

    Full Text Available Facing the pervasive presence of an apocalyptic imaginariness in Peruvian narrative fiction, this article shows that the Apocalypse has also been evoked by “serious” or non-fictional discourses, primarily in order to interpret issues related to social and political contingency. From this position, the article reviews a series of political events along Herbert Morote’s Réquiem por Perú, mi patria, a literary essay that interprets national reality.

  5. Resurgence of instrumental behavior after an abstinence contingency.

    Science.gov (United States)

    Bouton, Mark E; Schepers, Scott T

    2014-06-01

    In resurgence, an extinguished instrumental behavior (R1) recovers when a behavior that has replaced it (R2) is also extinguished. The phenomenon may be relevant to understanding relapse that can occur after the termination of "contingency management" treatments, in which an unwanted behavior (e.g., substance abuse) is reduced by reinforcing an alternative behavior. When reinforcement is discontinued, the unwanted behavior might resurge. However, unlike most resurgence experiments, contingency management treatments also introduce a negative contingency, in which reinforcers are not delivered unless the client has abstained from the unwanted behavior. In two experiments with rats, we therefore examined the effects of adding a negative "abstinence" contingency to the resurgence design. During response elimination, R2 was not reinforced unless R1 had not been emitted for a minimum period of time (45, 90, or 135 s). In both experiments, adding such a contingency to simple R1 extinction reduced, but did not eliminate, resurgence. In Experiment 2, we found the same effect in a yoked group that could earn reinforcers for R2 at the same points in time as the negative-contingency group, but without the requirement to abstain from R1. Thus, the negative contingency per se did not contribute to the reduction in resurgence. These results suggest that the contingency reduced resurgence by making reinforcers more difficult to earn and more widely spaced in time. This could have allowed the animal to learn that R1 was extinguished in the "context" of infrequent reinforcement-a context more like that of resurgence testing. The results are thus consistent with a contextual (renewal) account of resurgence. The method might provide a better model of relapse after termination of a contingency management treatment.

  6. Nuclear-criticality safety analysis of the Oak Ridge Y-12 plant birdcage-type containers for intraplant storage and transportation

    International Nuclear Information System (INIS)

    Stachowiak, R.V.

    1983-01-01

    The Oak Ridge Y-12 Plant birdcage-type containers include a family of cubic (20-, 24-, and 30-inch) open-framed containers used for the in-house storage and transfer of unirradiated enriched uranium metal. This paper provides insight into the nuclear criticality safety analysis for birdcage usage. All credible contingencies (abnormal events) were analyzed and proven safe (subcritical) in accordance with the requirements and procedures of nuclear criticality safety standards. Examples of the contingencies considered in the analysis include, but are not limited to, full water reflection of any single uranium mass loading, double batching of a loading, water moderation, and misuse of the birdcage. These and other applicable contingencies determine the maximum uranium mass for the 20- and 24-inch birdcages, which is 20 and 28 kilograms, respectively. The maximum number of birdcages stored at one location and the storage array configuration are also determined by the credible contingencies. Stacking restrictions for birdcage storage are three high for the 20-inch birdcage and two high for the 24-inch birdcage. A maximum size for square-based arrays is ten feet by ten feet. Any number of these arrays may be used provided a twelve-foot separation is maintained between each array. Such a storage arrangement results in a floor utilization of 0.42 birdcages per square foot. Better floor utilization, i.e., more birdcages per square foot, is possible with other array configurations that are not square-based. Physical as well as administrative controls, procedures, training, and audits are used to ensure these basic criteria are observed. 1 table

  7. Best practices in the organization, management and conduct of an effective investigation of events at nuclear power plants

    International Nuclear Information System (INIS)

    2008-09-01

    IAEA Safety Standards Series No. SF-1 entitled Fundamental Safety Principles: Safety Fundamentals states the need for operating organizations to establish a programme for the feedback and analysis of operating experience in nuclear power plants. Such a programme ensures that operating experience is analysed, events important to safety are reviewed in depth, lessons learned are disseminated to the staff of the organization and to the relevant national and international organizations, and corrective actions are effectively implemented. This publication has been developed to provide advice and assistance to nuclear installations, and related institutions including contractors and support organizations to strengthen and enhance their own feedback process through the implementation of best practices in organization, management and conduct of an effective investigation of events. Conducting an effective investigation of events is essential in supporting a proactive safety management approach of preventing events from occurring. Event investigation is the heart of the operating experience feedback programme and in an operating organization it is essential to develop and maintain necessary expertise in this area. Experience has shown that it is not sufficient to identify only the direct causes of an event and the event is bound to recur unless all the root causes and casual factors for an event are identified and necessary corrective actions are developed and implemented. The present publication is the outcome of a coordinated effort involving the participation of experts of nuclear organizations in several Member States. It was developed to further elaborate on how to implement the event investigation requirements in the area of feedback of operating experience, as specified in the IAEA Safety Requirements publication NS-R-2 on Safety of Nuclear Power Plants: Operation. This document will also complement the publication IAEA Services Series No. 10 - PROSPER Guidelines

  8. Nuclear Security Systems and Measures for Major Public Events. Implementing Guide (French Edition)

    International Nuclear Information System (INIS)

    2017-01-01

    This publication provides an overview, based on practical experience and lessons learned, for establishing nuclear security systems and measures for major public events. It covers technical and administrative nuclear security measures for developing the necessary organizational structure, developing plans, strategies and concepts of operations, and making arrangements for implementing the developed plans, strategies and concepts.

  9. 40 CFR 265.51 - Purpose and implementation of contingency plan.

    Science.gov (United States)

    2010-07-01

    ... contingency plan. 265.51 Section 265.51 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED..., STORAGE, AND DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 265.51 Purpose and implementation of contingency plan. (a) Each owner or operator must have a contingency plan for his facility. The...

  10. Analysis of overload conditions in distance relay under severe system contingencies

    Energy Technology Data Exchange (ETDEWEB)

    Halim Abu Bakar, Ab. [Department of Electrical Engineering, Universiti Malaya (Malaysia); Yatim, Fazilah Mat; Othman, Mohd Ridzal [Transmission Division, Tenaga Nasional Berhad (Malaysia); Yusof, Sallehuddin [Advanced Powor Solutions (Malaysia)

    2010-06-15

    Distance relay protection is widely used worldwide for protection scheme on high voltage transmission lines. This protection tends to be prone to load encroachment condition causing possible undesired tripping condition. Investigations of two system disturbances that occurred in TNB's (Tenaga Nasional Berhad) Grid in the year 2003 and 2005 have clearly revealed the occurrence of load encroachment condition following line overloads after large number of line tripping. Examination of the impedance locus trajectory during the overload events have enabled a distinction be made between power swing and load encroachment phenomena. This paper presents the analysis and findings of the investigation of the load encroachment phenomena of the two events, including other related transmission line contingencies. (author)

  11. Event-by-event jet quenching

    Energy Technology Data Exchange (ETDEWEB)

    Fries, R.J.; Rodriguez, R.; Ramirez, E.

    2010-08-14

    High momentum jets and hadrons can be used as probes for the quark gluon plasma (QGP) formed in nuclear collisions at high energies. We investigate the influence of fluctuations in the fireball on jet quenching observables by comparing propagation of light quarks and gluons through averaged, smooth QGP fireballs with event-by-event jet quenching using realistic inhomogeneous fireballs. We find that the transverse momentum and impact parameter dependence of the nuclear modification factor R{sub AA} can be fit well in an event-by-event quenching scenario within experimental errors. However the transport coefficient {cflx q} extracted from fits to the measured nuclear modification factor R{sub AA} in averaged fireballs underestimates the value from event-by-event calculations by up to 50%. On the other hand, after adjusting {cflx q} to fit R{sub AA} in the event-by-event analysis we find residual deviations in the azimuthal asymmetry v{sub 2} and in two-particle correlations, that provide a possible faint signature for a spatial tomography of the fireball. We discuss a correlation function that is a measure for spatial inhomogeneities in a collision and can be constrained from data.

  12. Event-by-event jet quenching

    Energy Technology Data Exchange (ETDEWEB)

    Rodriguez, R. [Cyclotron Institute and Physics Department, Texas A and M University, College Station, TX 77843 (United States); Fries, R.J., E-mail: rjfries@comp.tamu.ed [Cyclotron Institute and Physics Department, Texas A and M University, College Station, TX 77843 (United States); RIKEN/BNL Research Center, Brookhaven National Laboratory, Upton, NY 11973 (United States); Ramirez, E. [Physics Department, University of Texas El Paso, El Paso, TX 79968 (United States)

    2010-09-27

    High momentum jets and hadrons can be used as probes for the quark gluon plasma (QGP) formed in nuclear collisions at high energies. We investigate the influence of fluctuations in the fireball on jet quenching observables by comparing propagation of light quarks and gluons through averaged, smooth QGP fireballs with event-by-event jet quenching using realistic inhomogeneous fireballs. We find that the transverse momentum and impact parameter dependence of the nuclear modification factor R{sub AA} can be fit well in an event-by-event quenching scenario within experimental errors. However the transport coefficient q extracted from fits to the measured nuclear modification factor R{sub AA} in averaged fireballs underestimates the value from event-by-event calculations by up to 50%. On the other hand, after adjusting q to fit R{sub AA} in the event-by-event analysis we find residual deviations in the azimuthal asymmetry v{sub 2} and in two-particle correlations, that provide a possible faint signature for a spatial tomography of the fireball. We discuss a correlation function that is a measure for spatial inhomogeneities in a collision and can be constrained from data.

  13. Nuclear energy center site survey: fuel cycle studies

    International Nuclear Information System (INIS)

    1976-05-01

    Background information for the Nuclear Regulatory Commission Nuclear Energy Center Site Survey is presented in the following task areas: economics of integrated vs. dispersed nuclear fuel cycle facilities, plutonium fungibility, fuel cycle industry model, production controls and failure contingencies, environmental impact, waste management, emergency response capability, and feasibility evaluations

  14. OVERVIEW OF THE ACTIVITIES OF THE NUCLEAR ENERGY AGENCY WORKING GROUP ON EXTERNAL EVENTS

    Energy Technology Data Exchange (ETDEWEB)

    Nakoski, John A.; Smith, Curtis L.; Kim, Min Kyu

    2016-10-01

    The Orgranisation for Economic Cooperation and Development (OECD) Nuclear Energy Agency (NEA) has established a Working Group on External Events (WGEV) that provides a forum for subject matter experts from the nuclear industry and regulators to improve the understanding and treatment of external hazards that would support the continued safety performance of nuclear installations, and improve the effectiveness of regulatory practices, in NEA member countries. This report provides a description of the ongoing work of the WGEV. The work of the WGEV includes the collection of information and conducting a workshop on severe weather and storm surge that brought together a diverse group of subject matter experts to identify commendable practices related to the treatment of severe weather and storm surge consideration in regulatory and operational decision-making. Other work of the WGEV includes looking at science-based screening of external events that are factored into decisions on the safe operation of nuclear facilities; and identification of commendable practices and knowledge gaps on riverine flooding.

  15. Contingency plan for the Oak Ridge National Laboratory liquid low-level waste system

    International Nuclear Information System (INIS)

    DePaoli, S.M.; Ferrada, J.J.; Abraham, T.J.; Brown, C.H.; Lin, K.H.

    1989-12-01

    Oak Ridge National Laboratory (ORNL) is one of the major Department of Energy (DOE) facilities that performs various research and development (R ampersand D) activities. Liquid low-level waste (LLLW) is generated in the course of this work. The primary objective of this task is to develop specific plans of action to be implemented, in the event that the storage space for the LLLW concentrate should approach the minimum value in the operational flexibility range or a problem should develop concerning storage space available for dilute LLLW. This report considers contingency plans/options in the light of six different scenarios, including ''normal operation'' and five others. Evaluation and prioritization of the options were carried out separately for each case. Brief discussions of these scenarios and contingency plans/options are presented. 20 refs., 14 figs., 14 tabs

  16. GC Side Event: Nuclear Energy Innovation and the Paris Agreement. Presentations

    International Nuclear Information System (INIS)

    2017-01-01

    This event presented roadmaps for nuclear energy innovation linked to nationally determined contributions (NDCs) to the global response to climate change. It covered enabling conditions for research and development, the regulatory framework and infrastructure to support Member States’ NDC updates from 2020 to 2050

  17. Equivalence relations and the reinforcement contingency.

    Science.gov (United States)

    Sidman, M

    2000-07-01

    Where do equivalence relations come from? One possible answer is that they arise directly from the reinforcement contingency. That is to say, a reinforcement contingency produces two types of outcome: (a) 2-, 3-, 4-, 5-, or n-term units of analysis that are known, respectively, as operant reinforcement, simple discrimination, conditional discrimination, second-order conditional discrimination, and so on; and (b) equivalence relations that consist of ordered pairs of all positive elements that participate in the contingency. This conception of the origin of equivalence relations leads to a number of new and verifiable ways of conceptualizing equivalence relations and, more generally, the stimulus control of operant behavior. The theory is also capable of experimental disproof.

  18. The cause multiplicity and the multiple cause style of adverse events in Japanese nuclear power plants

    International Nuclear Information System (INIS)

    Miyazaki, Takamasa

    2008-01-01

    An adverse event in a nuclear power plant occurs due to either one cause or multiple causes. To consider ways of preventing adverse events, it is useful to clarify whether events are caused by single or multiple causes. In this study, the multiple causes is expressed using the cause multiplicity and the multiple cause style. Classified causes of adverse events in Japanese nuclear power plants were analyzed, with the following results: the cause multiplicity of serious adverse events is higher than that of minor adverse events, and the multiple cause style can be expressed by combining two styles: series type and parallel type. Also, for a multiple cause event, a new method of displaying the event is presented as a cause-chain chart where the cause items are arranged in a sequential way and are connected considering the mutual relations among the causes. This new display method shows the whole flow of issues concerning the event more simply than the conventional display method of the chain of phenomena, and would be useful for considering the terminating point of the chain of causes. (author)

  19. Cause trending analysis for licensing operational events in Daya Bay Nuclear Power Station

    International Nuclear Information System (INIS)

    Wang Dewei

    2005-01-01

    The human causal factors for all human error licensing operational events on Daya Bay nuclear power station since 1993 to 2003 are categorized, the trend of these causal factors is analyzed. The emphasis is placed on analyzing the deficiencies on complying with and executing regulations and procedures. The results provide directional reference for nuclear power station to improve human performance. (author)

  20. Optimal Nonlinear Pricing, Bundling Commodities and Contingent Services

    International Nuclear Information System (INIS)

    Podesta, Marion; Poudou, Jean-Christophe

    2008-01-01

    In this paper, we propose to analyze optimal nonlinear pricing when a firm offers in a bundle a commodity and a contingent service. The paper studies a mechanism design where all private information can be captured in a single scalar variable in a monopoly context. We show that to propose the package for commodity and service is less costly for the consumer, the firm has lower consumers' rent than the situation where it sells their good and contingent service under an independent pricing strategy. In fact, the possibility to use price discrimination via the supply of package is dominated by the fact that it is costly for the consumer to sign two contracts. Bundling energy and a contingent service is a profitable strategy for a energetician monopoly practising optimal nonlinear tariff. We show that the rates of the energy and the contingent service depend to the optional character of the contingent service and depend to the degree of complementarity between commodities and services. (authors)

  1. Basic Safety Considerations for Nuclear Power Plant Dealing with External Human Induced Events

    Energy Technology Data Exchange (ETDEWEB)

    Salem, W., E-mail: wafaasalem21@yahoo.com [Nuclear and Radiological Regulatory Authority (Egypt)

    2014-10-15

    Facilities and human activities in the region in which a nuclear power plant is located may under some conditions affect its safety. The potential sources of human induced events external to the plant should be identified and the severity of the possible resulting hazard phenomena should be evaluated to derive the appropriate design bases for the plant. They should also be monitored and periodically assessed over the lifetime of the plant to ensure that consistency with the design assumptions is maintained. External human induced events that could affect safety should be investigated in the site evaluation stage for every nuclear power plant site. The region is required to be examined for facilities and human activities that have the potential, under certain conditions, to endanger the nuclear power plant over its entire lifetime. Each relevant potential source is required to be identified and assessed to determine the potential interactions with personnel and plant items important to safety. (author)

  2. Guide on a national system for collecting, assessing and disseminating information on safety-related events in nuclear power plants

    International Nuclear Information System (INIS)

    1983-02-01

    There is a wide spectrum of safety significance in the events that can occur during nuclear power plant operations. It is important that lessons be learned from safety-related events (hereinafter referred to as unusual events) so as to improve the safety of nuclear power plants. Hence formal procedures should be established for this purpose. The purpose of this document is to provide guidance to Member States for establishing a system (hereinafter referred to as a national system) for collecting, storing, retrieving, assessing and disseminating information on unusual events in nuclear power plants. The guidance given is based on experience gained in the use of existing national and international systems. This guide covers a national system that is part of a programme to improve nuclear power plant safety using experience gained from operating plants both within and outside the country. Implementing the recommendations in this guide would render any national system compatible with other national systems and facilitate the participation in the IAEA System for Reporting Unusual Events with Safety Significance (hereinafter referred to as the IAEA Incident Reporting System, IAEA-IRS) for more widespread dissemination of lessons learned from nuclear power plant operation

  3. Contingency blindness: location-identity binding mismatches obscure awareness of spatial contingencies and produce profound interference in visual working memory.

    Science.gov (United States)

    Fiacconi, Chris M; Milliken, Bruce

    2012-08-01

    The purpose of the present study was to highlight the role of location-identity binding mismatches in obscuring explicit awareness of a strong contingency. In a spatial-priming procedure, we introduced a high likelihood of location-repeat trials. Experiments 1, 2a, and 2b demonstrated that participants' explicit awareness of this contingency was heavily influenced by the local match in location-identity bindings. In Experiment 3, we sought to determine why location-identity binding mismatches produce such low levels of contingency awareness. Our results suggest that binding mismatches can interfere substantially with visual-memory performance. We attribute the low levels of contingency awareness to participants' inability to remember the critical location-identity binding in the prime on a trial-to-trial basis. These results imply a close interplay between object files and visual working memory.

  4. Developing standardized facility contingency plans

    International Nuclear Information System (INIS)

    Davidson, D.A.

    1993-01-01

    Texaco consists of several operating departments that are, in effect, independent companies. Each of these departments is responsible for complying with all environmental laws and regulations. This includes the preparation by each facility to respond to an oil spill at that location. For larger spills, however, management of the response will rest with corporate regional response teams. Personnel from all departments make up the regional teams. In 1990, Congress passed the Oil Pollution Act. In 1991, the US Coast Guard began developing oil spill response contingency plan regulations, which they are still working on. Meanwhile, four of the five west coast states have also passed laws requiring contingency plans. (Only Hawaii has chosen to wait and see what the federal regulations will entail). Three of the states have already adopted regulations. Given these laws and regulations, along with its corporate structure, Texaco addressed the need to standardize local facility plans as well as its response organization. This paper discusses how, by working together, the Texaco corporate international oil spill response staff and the Texaco western region on-scene commander developed: A standard contingency plan format crossing corporate boundaries and meeting federal and state requirements. A response organization applicable to any size facility or spill. A strategy to sell the standard contingency plan and response organization to the operating units

  5. Skype me! Socially Contingent Interactions Help Toddlers Learn Language

    Science.gov (United States)

    Roseberry, Sarah; Hirsh-Pasek, Kathy; Golinkoff, Roberta Michnick

    2013-01-01

    Language learning takes place in the context of social interactions, yet the mechanisms that render social interactions useful for learning language remain unclear. This paper focuses on whether social contingency might support word learning. Toddlers aged 24- to 30-months (N=36) were exposed to novel verbs in one of three conditions: live interaction training, socially contingent video training over video chat, and non-contingent video training (yoked video). Results suggest that children only learned novel verbs in socially contingent interactions (live interactions and video chat). The current study highlights the importance of social contingency in interactions for language learning and informs the literature on learning through screen media as the first study to examine word learning through video chat technology. PMID:24112079

  6. QV modal distance displacement - a criterion for contingency ranking

    Energy Technology Data Exchange (ETDEWEB)

    Rios, M.A.; Sanchez, J.L.; Zapata, C.J. [Universidad de Los Andes (Colombia). Dept. of Electrical Engineering], Emails: mrios@uniandes.edu.co, josesan@uniandes.edu.co, cjzapata@utp.edu.co

    2009-07-01

    This paper proposes a new methodology using concepts of fast decoupled load flow, modal analysis and ranking of contingencies, where the impact of each contingency is measured hourly taking into account the influence of each contingency over the mathematical model of the system, i.e. the Jacobian Matrix. This method computes the displacement of the reduced Jacobian Matrix eigenvalues used in voltage stability analysis, as a criterion of contingency ranking, considering the fact that the lowest eigenvalue in the normal operation condition is not the same lowest eigenvalue in N-1 contingency condition. It is made using all branches in the system and specific branches according to the IBPF index. The test system used is the IEEE 118 nodes. (author)

  7. Objective and Essential Elements of a State's Nuclear Security Regime. Nuclear Security Fundamentals

    International Nuclear Information System (INIS)

    2013-01-01

    The possibility that nuclear material or other radioactive material could be used for criminal purposes or intentionally used in an unauthorized manner cannot be ruled out in the current global situation. States have responded to this risk by engaging in a collective commitment to strengthen the protection and control of such material and to respond effectively to nuclear security events. States have agreed to strengthen existing instruments and have established new international legal instruments to enhance nuclear security worldwide. Nuclear security is fundamental in the management of nuclear technologies and in applications where nuclear material or other radioactive material is used or transported. Through its nuclear security programme, the IAEA supports States to establish, maintain and sustain an effective nuclear security regime. The IAEA has adopted a comprehensive approach to nuclear security. This recognizes that an effective national nuclear security regime builds on: the implementation of relevant international legal instruments; information protection; physical protection; material accounting and control; detection of and response to trafficking in such material; national response plans; and contingency measures. With its Nuclear Security Series, the IAEA aims to assist States in implementing and sustaining such a regime in a coherent and integrated manner. The IAEA Nuclear Security Series comprises: Nuclear Security Fundamentals, which include the objective and essential elements of a State's nuclear security regime; Recommendations; Implementing Guides; and Technical Guidance. Each State carries the full responsibility for nuclear security. Specifically, each State has the responsibility to provide for the security of nuclear material and other radioactive material and their associated facilities and activities; to ensure the security of such material in use, storage, or in transport; to combat illicit trafficking and the inadvertent movement of

  8. Trend analysis of nuclear reactor automatic trip events subjected to operator's human error at United States nuclear power plants

    International Nuclear Information System (INIS)

    Takagawa, Kenichi

    2009-01-01

    Trends in nuclear reactor automatic trip events due to human errors during plant operating mode have been analyzed by extracting 20 events which took place in the United States during the period of seven years from 2002 to 2008, cited in the LERs (Licensee Event Reports) submitted to the US Nuclear Regulatory Commission (NRC). It was shown that the yearly number of events was relatively large before 2005, and thereafter the number decreased. A period of stable operation, in which the yearly number was kept very small, continued for about three years, and then the yearly number turned to increase again. Before 2005, automatic trip events occurred more frequently during periodic inspections or start-up/shut-down operations. The recent trends, however, indicate that trip events became more frequent due to human errors during daily operations. Human errors were mostly caused by the self-conceit and carelessness of operators through the whole period. The before mentioned trends in the yearly number of events might be explained as follows. The decrease in the automatic trip events is attributed to sharing trouble information, leading as a consequence to improvement of the manual and training for the operations which have a higher potential risk of automatic trip. Then, while the period of stable operation continued, some operators came to pay less attention to preventing human errors and not interest in the training, leading to automatic trip events in reality due to miss-operation. From these analyses on trouble experiences in the US, we learnt the followings to prevent the occurrence similar troubles in Japan: Operators should be thoroughly skilled in basic actions to prevent human errors as persons concerned. And it should be further emphasized that they should elaborate by imaging actual plant operations even though the simulator training gives them successful experiences. (author)

  9. Contingent Employment in the Netherlands

    OpenAIRE

    Pot, F.; Koene, Bas; Paauwe, Jaap

    2001-01-01

    textabstractIn the last decade the Dutch labour market has demonstrated an admirable capacity to generate jobs. Consequently, the unemployment rate has significantly decreased. However, the newly generated jobs are a-typical in the sense that they are not full-time jobs based on open-ended contracts. Instead, the job growth has relied on the growth of part-time and contingent jobs. While the creation of part-time jobs seems to be employee-driven, contingent employment, in contrast, seems to b...

  10. Contingency Management and deliberative decision-making processes

    Directory of Open Access Journals (Sweden)

    Paul S. Regier

    2015-06-01

    Full Text Available Contingency Management is an effective treatment for drug addiction. The current explanation for its success is rooted in alternative reinforcement theory. We suggest that alternative reinforcement theory is inadequate to explain the success of Contingency Management and produce a model based on demand curves that show how little the monetary rewards offered in this treatment would affect drug use. Instead, we offer an explanation of its success based on the concept that it accesses deliberative decision-making processes. We suggest that Contingency Management is effective because it offers a concrete and immediate alternative to using drugs, which engages deliberative processes, improves the ability of those deliberative processes to attend to non-drug options, and offsets more automatic action-selection systems. This theory makes explicit predictions that can be tested, suggests which users will be most helped by Contingency Management, and suggests improvements in its implementation.

  11. Contingency Management and Deliberative Decision-Making Processes.

    Science.gov (United States)

    Regier, Paul S; Redish, A David

    2015-01-01

    Contingency management is an effective treatment for drug addiction. The current explanation for its success is rooted in alternative reinforcement theory. We suggest that alternative reinforcement theory is inadequate to explain the success of contingency management and produce a model based on demand curves that show how little the monetary rewards offered in this treatment would affect drug use. Instead, we offer an explanation of its success based on the concept that it accesses deliberative decision-making processes. We suggest that contingency management is effective because it offers a concrete and immediate alternative to using drugs, which engages deliberative processes, improves the ability of those deliberative processes to attend to non-drug options, and offsets more automatic action-selection systems. This theory makes explicit predictions that can be tested, suggests which users will be most helped by contingency management, and suggests improvements in its implementation.

  12. Nuclear accidents

    International Nuclear Information System (INIS)

    1987-01-01

    On 27 May 1986 the Norwegian government appointed an inter-ministerial committee of senior officials to prepare a report on experiences in connection with the Chernobyl accident. The present second part of the committee's report describes proposals for measures to prevent and deal with similar accidents in the future. The committee's evaluations and proposals are grouped into four main sections: Safety and risk at nuclear power plants; the Norwegian contingency organization for dealing with nuclear accidents; compensation issues; and international cooperation

  13. Nuclear and energies - Synthesis of striking events from December 2012 to May 2013. Nr 61/June

    International Nuclear Information System (INIS)

    Lenail, Bernard; Ducroux, Guy; Lamorlette, Guy; Seyve, Claude; Greneche, Dominique; Gollion, Jacques; Seyve, Claude; Darricau, Aime; Raisonnier, Daniele; Lepine, Gerard; Vandevoir, Roger

    2013-06-01

    This issue first proposes a comment on energy transition: challenges to define and reach a desirable energy mix in 2025, eventual scenarios to meet climatic commitments (factor-4 reduction of greenhouse gas emissions by 2050, compliance with the 3 x 20 pc European objective in 2020). A set of articles then proposes overviews and comments on the evolution of the energy sector, on recent events in the field of renewable energies, on the struggle against greenhouse effect. The next part more specifically addresses the nuclear energy: highlights and facts in the field of nuclear fuel (from mining to fuel production) and in the field of the back end of the fuel cycle (by Areva, and in different countries), perspectives for the Thorium fuel cycle (motivations for the use of the Thorium cycle, benefits and drawbacks), highlights and events regarding nuclear reactors in France, Belgium, United Kingdom, Finland, Turkey, Czech Republic, Hungary, Poland, Spain, China, Japan, Vietnam, Bangladesh, USA, Brazil and Argentina. A last set of articles addresses the relationship between nuclear and society: a focus on the situation in Sahel after the French military intervention in Mali (the hostage issue), the impact of nuclear power on the environment (with reference to events in France, in Germany, in Switzerland and in the USA), and issues related to nuclear proliferation (notably with North Korea and Iran)

  14. Turning negative memories around: Contingency versus devaluation techniques.

    Science.gov (United States)

    Dibbets, Pauline; Lemmens, Anke; Voncken, Marisol

    2018-09-01

    It is assumed that fear responses can be altered by changing the contingency between a conditioned stimulus (CS) and an unconditioned stimulus (US), or by devaluing the present mental representation of the US. The aim of the present study was to compare the efficacy of contingency- and devaluation-based intervention techniques on the diminishment in - and return of fear. We hypothesized that extinction (EXT, contingency-based) would outperform devaluation-based techniques regarding contingency measures, but that devaluation-based techniques would be most effective in reducing the mental representation of the US. Additionally, we expected that incorporations of the US during devaluation would result in less reinstatement of the US averseness. Healthy participants received a fear conditioning paradigm followed by one of three interventions: extinction (EXT, contingency-based), imagery rescripting (ImRs, devaluation-based) or eye movement desensitization and reprocessing (EMDR, devaluation-based). A reinstatement procedure and test followed the next day. EXT was indeed most successful in diminishing contingency-based US expectancies and skin conductance responses (SCRs), but all interventions were equally successful in reducing the averseness of the mental US representation. After reinstatement EXT showed lowest expectancies and SCRs; no differences were observed between the conditions concerning the mental US representation. A partial reinforcement schedule was used, resulting in a vast amount of contingency unaware participants. Additionally, a non-clinical sample was used, which may limit the generalizability to clinical populations. EXT is most effective in reducing conditioned fear responses. Copyright © 2018 Elsevier Ltd. All rights reserved.

  15. Discrete-event simulation of nuclear-waste transport in geologic sites subject to disruptive events. Final report

    International Nuclear Information System (INIS)

    Aggarwal, S.; Ryland, S.; Peck, R.

    1980-01-01

    This report outlines a methodology to study the effects of disruptive events on nuclear waste material in stable geologic sites. The methodology is based upon developing a discrete events model that can be simulated on the computer. This methodology allows a natural development of simulation models that use computer resources in an efficient manner. Accurate modeling in this area depends in large part upon accurate modeling of ion transport behavior in the storage media. Unfortunately, developments in this area are not at a stage where there is any consensus on proper models for such transport. Consequently, our work is directed primarily towards showing how disruptive events can be properly incorporated in such a model, rather than as a predictive tool at this stage. When and if proper geologic parameters can be determined, then it would be possible to use this as a predictive model. Assumptions and their bases are discussed, and the mathematical and computer model are described

  16. Extreme external events in the design and assessment of nuclear power plants

    International Nuclear Information System (INIS)

    2003-03-01

    The analysis of feedback experience from the operation of nuclear power plants (NPPs) in the past 20 years shows few cases of degradation of the plant safety initiated by external events. However, when these have occurred, the consequences have been serious, involving challenges to the defence in depth of the plant. Part of the problem involves the definition of the design basis parameters for some scenarios and differences among regulators on the methods for the protection of operational NPPs in relation to external events. This results in different engineering practices in Member States for the siting and design of NPPs. In the framework of the present revision of the IAEA safety standards on siting and design of NPPs, many initiatives have been implemented by the IAEA in recent years aimed at a systematic analysis of engineering practices in Member States. The most recent event in this connection was a Technical Committee Meeting (TCM) on Structural Safety of NPPs in Relation to Extreme External Loads, organized with the specific objective of evaluating the state of the art of NPP design in relation to external events. Such an analysis provided a technical background for the development of a common technical basis for an integrated approach in site evaluation, design and operation in relation to extreme external events. The scope included new and existing plants, as they are required to meet the same general safety principles, in spite of their peculiarities. The objective of this publication is to provide a technical background to drive regulators, plant owners and designers in the definition of a consistent strategy in selected safety issues on site evaluation, design and operation in relation to extreme external events. This publication is also of support to the IAEA in the development of safety standards since many Safety Guides dealing with related topics are under periodic review. Four major tasks were identified to comply with these general objectives

  17. Internal event analysis of Laguna Verde Unit 1 Nuclear Power Plant. System Analysis

    International Nuclear Information System (INIS)

    Huerta B, A.; Aguilar T, O.; Nunez C, A.; Lopez M, R.

    1993-01-01

    The Level 1 results of Laguna Verde Nuclear Power Plant PRA are presented in the I nternal Event Analysis of Laguna Verde Unit 1 Nuclear Power Plant , CNSNS-TR-004, in five volumes. The reports are organized as follows: CNSNS-TR-004 Volume 1: Introduction and Methodology. CNSNS-TR-004 Volume 2: Initiating Event and Accident Sequences. CNSNS-TR-004 Volume 3: System Analysis. CNSNS-TR-004 Volume 4: Accident Sequence Quantification and Results. CNSNS-TR-004 Volume 5: Appendices A, B and C. This volume presents the results of the system analysis for the Laguna Verde Unit 1 Nuclear Power Plant. The system analysis involved the development of logical models for all the systems included in the accident sequence event tree headings, and for all the support systems required to operate the front line systems. For the Internal Event analysis for Laguna Verde, 16 front line systems and 5 support systems were included. Detailed fault trees were developed for most of the important systems. Simplified fault trees focusing on major faults were constructed for those systems that can be adequately represent,ed using this kind of modeling. For those systems where fault tree models were not constructed, actual data were used to represent the dominant failures of the systems. The main failures included in the fault trees are hardware failures, test and maintenance unavailabilities, common cause failures, and human errors. The SETS and TEMAC codes were used to perform the qualitative and quantitative fault tree analyses. (Author)

  18. Breaking the Myth of Flexible Work: Contingent Work in Toronto. A Study Conducted by the Contingent Workers Project.

    Science.gov (United States)

    de Wolff, Alice

    A survey of 205 people, 4 group interviews with approximately 30 people, and 6 design and analysis meetings involving approximately 40 people were conducted in a 1999 participatory study of contingent workers in Toronto. (Contingent work was defined to be lower-waged forms of non-permanent work arrangements that include contracting, employment…

  19. Reporting, Recording, and Transferring Contingency Demand Data

    National Research Council Canada - National Science Library

    Smith, Bernard

    2000-01-01

    .... In this report, we develop a standard set of procedures for reporting and recording demand data at the contingency location and transferring contingency demand data to the home base - ensuring proper level allocation and valid worldwide peacetime operating stock (POS) and readiness spares package (RSP) requirements.

  20. Sartre's Contingency of Being and Asouzu's Principle of Causality ...

    African Journals Online (AJOL)

    The position of this work is that all contingent beings have a causal agent. This position is taken as a result of trying to delve into the issue of contingency and causality of being which has been discussed by many philosophers of diverse epochs of philosophy. This work tries to participate in the debate of whether contingent ...

  1. 40 CFR 267.54 - When must I amend the contingency plan?

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false When must I amend the contingency plan... STANDARDIZED PERMIT Contingency Plan and Emergency Procedures § 267.54 When must I amend the contingency plan? You must review, and immediately amend the contingency plan, if necessary, whenever: (a) The facility...

  2. Safety at basic nuclear facilities other than nuclear power plants. Lessons learned from significant events reported in 2011 and 2012

    International Nuclear Information System (INIS)

    2014-01-01

    The third report on the safety of basic nuclear installations in France other than power reactors presents an IRSN's analysis of significant events reported to the Nuclear Safety Authority in the years 2011 and 2012. It covers plants, laboratories, research reactors and facilities for the treatment, storage or disposal of waste. This report aims to contribute to a better understanding by stakeholders and more widely by the public of the safety and radiation protection issues associated with the operation of nuclear facilities, the progress made in terms of safety as well as the identified deficiencies. The main trend shows, once again, the significant role of organizational and human factors in the significant events that occurred in 2011 and 2012, of which the vast majority are without noteworthy consequences. Aging mechanisms are another major cause of equipment failure and require special attention. The report also provides IRSN's analysis of specific events that are particularly instructive for facility safety and a synthesis of assessments performed by IRSN on topics that are important for safety and radiation protection. IRSN also includes an overview of its analysis of measures proposed by licensees for increasing the safety of their facilities after the March 2011 accident at the Fukushima Daiichi nuclear power plant in Japan, which consist of providing a 'hardened safety core' to confront extreme situations (earthquake, flooding, etc.) that are unlikely but plausible and can bring about levels of hazards higher than those taken into account in the design of the facilities

  3. 25 CFR 39.503 - How can a school use contingency funds?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false How can a school use contingency funds? 39.503 Section 39.503 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR EDUCATION THE INDIAN SCHOOL EQUALIZATION PROGRAM Contingency Fund § 39.503 How can a school use contingency funds? Contingency funds can be...

  4. Estimating state-contingent production functions

    DEFF Research Database (Denmark)

    Rasmussen, Svend; Karantininis, Kostas

    The paper reviews the empirical problem of estimating state-contingent production functions. The major problem is that states of nature may not be registered and/or that the number of observation per state is low. Monte Carlo simulation is used to generate an artificial, uncertain production...... environment based on Cobb Douglas production functions with state-contingent parameters. The pa-rameters are subsequently estimated based on different sizes of samples using Generalized Least Squares and Generalized Maximum Entropy and the results are compared. It is concluded that Maximum Entropy may...

  5. 78 FR 46781 - Federal Acquisition Regulation; Definition of Contingency Operation

    Science.gov (United States)

    2013-08-01

    ... Federal Acquisition Regulation; Definition of Contingency Operation AGENCY: Department of Defense (DoD... the Federal Acquisition Regulation (FAR) to revise the definition of ``contingency operation'' to... ``contingency operation'' at FAR 2.101 in accordance with the statutory change to the definition made by...

  6. The double-contingency principle: An historical perspective

    International Nuclear Information System (INIS)

    Knief, R.A.

    1995-01-01

    Standard ANSI/ANS-8.1 states the double contingency principle as: Process designs should, in general, incorporate sufficient factors of safety to require at least two unlikely, independent, and concurrent changes in process conditions before a criticality accident is possible. This paper presents a perspective on the double contingency principle

  7. 40 CFR 300.210 - Federal contingency plans.

    Science.gov (United States)

    2010-07-01

    ... contingency plans under the national response system: The National Contingency Plan, RCPs, and ACPs. These... discharge under § 300.324, and to mitigate or prevent a substantial threat of such a discharge, from a vessel, offshore facility, or onshore facility operating in or near the area. (2) The areas of...

  8. Investigations on human error hazards in recent unintended trip events of Korean nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Sa Kil; Jang, Tong Il; Lee, Yong Hee; Shin, Kwang Hyeon [KAERI, Daejeon (Korea, Republic of)

    2012-10-15

    According to the Operational Performance Information System (OPIS) which has been operated to improve the public understanding by the KINS (Korea Institute of Nuclear Safety), unintended trip events by mainly human errors counted up to 38 cases (18.7%) from 2000 to 2011. Although the Nuclear Power Plant (NPP) industry in Korea has been making efforts to reduce the human errors which have largely contributed to trip events, the human error rate might keep increasing. Interestingly, digital based I and C systems is the one of the reduction factors of unintended reactor trips. Human errors, however, have occurred due to the digital based I and C systems because those systems require new or changed behaviors to the NPP operators. Therefore, it is necessary that the investigations of human errors consider a new methodology to find not only tangible behavior but also intangible behavior such as organizational behaviors. In this study we investigated human errors to find latent factors such as decisions and conditions in the all of the unintended reactor trip events during last dozen years. To find them, we applied the HFACS (Human Factors Analysis and Classification System) which is a commonly utilized tool for investigating human contributions to aviation accidents under a widespread evaluation scheme. The objective of this study is to find latent factors behind of human errors in nuclear reactor trip events. Therefore, a method to investigate unintended trip events by human errors and the results will be discussed in more detail.

  9. Investigations on human error hazards in recent unintended trip events of Korean nuclear power plants

    International Nuclear Information System (INIS)

    Kim, Sa Kil; Jang, Tong Il; Lee, Yong Hee; Shin, Kwang Hyeon

    2012-01-01

    According to the Operational Performance Information System (OPIS) which has been operated to improve the public understanding by the KINS (Korea Institute of Nuclear Safety), unintended trip events by mainly human errors counted up to 38 cases (18.7%) from 2000 to 2011. Although the Nuclear Power Plant (NPP) industry in Korea has been making efforts to reduce the human errors which have largely contributed to trip events, the human error rate might keep increasing. Interestingly, digital based I and C systems is the one of the reduction factors of unintended reactor trips. Human errors, however, have occurred due to the digital based I and C systems because those systems require new or changed behaviors to the NPP operators. Therefore, it is necessary that the investigations of human errors consider a new methodology to find not only tangible behavior but also intangible behavior such as organizational behaviors. In this study we investigated human errors to find latent factors such as decisions and conditions in the all of the unintended reactor trip events during last dozen years. To find them, we applied the HFACS (Human Factors Analysis and Classification System) which is a commonly utilized tool for investigating human contributions to aviation accidents under a widespread evaluation scheme. The objective of this study is to find latent factors behind of human errors in nuclear reactor trip events. Therefore, a method to investigate unintended trip events by human errors and the results will be discussed in more detail

  10. Investigation and analysis of hydrogen ignition and explosion events in foreign nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Okuda, Yasunori [Institute of Nuclear Safety System, Inc., Mihama, Fukui (Japan)

    2002-09-01

    Reports about hydrogen ignition and explosion events in foreign nuclear power plants from 1980 to 2001 were investigated, and 31 events were identified. Analysis showed that they were categorized in (1) outer leakage ignition events and (2) inner accumulation ignition events. The dominant event for PWR (pressurized water reactor) was outer leakage ignition in the main generator, and in BWR (boiling water reactor) it was inner accumulation ignition in the off-gas system. The outer leakage ignition was a result of work process failure with the ignition source, operator error, or main generator hydrogen leakage. The inner accumulation ignition events were caused by equipment failure or insufficient monitoring. With careful preventive measures, the factors leading to these events could be eliminated. (author)

  11. Contingency Management with Human Autonomy Teaming

    Science.gov (United States)

    Shively, Robert J.; Lachter, Joel B.

    2018-01-01

    Automation is playing an increasingly important role in many operations. It is often cheaper faster and more precise than human operators. However, automation is not perfect. There are many situations in which a human operator must step in. We refer to these instances as contingencies and the act of stepping in contingency management. Here we propose coupling Human Autonomy Teaming (HAT) with contingency management. We describe two aspects to HAT, bi-directional communication, and working agreements (or plays). Bi-directional communication like Crew Resource Management in traditional aviation, allows all parties to contribute to a decision. Working agreements specify roles and responsibilities. Importantly working agreements allow for the possibility of roles and responsibilities changing depending on environmental factors (e.g., situations the automation was not designed for, workload, risk, or trust). This allows for the automation to "automatically" become more autonomous as it becomes more trusted and/or it is updated to deal with a more complete set of possible situations. We present a concrete example using a prototype contingency management station one might find in a future airline operations center. Automation proposes reroutes for aircraft that encounter bad weather or are forced to divert for environmental or systems reasons. If specific conditions are met, these recommendations may be autonomously datalinked to the affected aircraft.

  12. Management issues regarding the contingent workforce

    Energy Technology Data Exchange (ETDEWEB)

    Bowen-Smed, S. [Bowen Workforce Solutions, Calgary, AB (Canada)

    2004-07-01

    Fifty per cent of corporate leaders in Calgary today will be eligible for retirement over the next 5 years. In addition, 53 per cent of the entire Calgary workforce is 45 years or older. This paper suggests that only companies that seek aggressive programs to engage immigrants and contractors will weather the skills shortages anticipated in the future. It was noted that contractors care about aligning values to organizations, regardless of the project length, and that professional development is a key consideration when it comes to selecting their next project. Contingent workforce issues include: effectiveness; classification; risk; and cost. It was stated that effectiveness of the contingent workforce is an employer's responsibility. Factors that would strengthen the relationship between corporations and contractors include: proper orientation to manage expectations; training to improve productivity; tracking to enhance the quality of the workforce; and a management process to ensure adherence to protocol. It was concluded that the contingent workforce is an essential component to human capital management strategy, but that key issues must be managed to avoid unnecessary costs. In addition, effectiveness improves when processes are implemented. It was also suggested that technology is an essential component of the solution. Outsourcing is an effective approach to managing the contingent workforce. tabs., figs.

  13. Objective and Essential Elements of a State's Nuclear Security Regime. Nuclear Security Fundamentals (Chinese Edition)

    International Nuclear Information System (INIS)

    2014-01-01

    The possibility that nuclear material or other radioactive material could be used for criminal purposes or intentionally used in an unauthorized manner cannot be ruled out in the current global situation. States have responded to this risk by engaging in a collective commitment to strengthen the protection and control of such material and to respond effectively to nuclear security events. States have agreed to strengthen existing instruments and have established new international legal instruments to enhance nuclear security worldwide. Nuclear security is fundamental in the management of nuclear technologies and in applications where nuclear material or other radioactive material is used or transported. Through its nuclear security programme, the IAEA supports States to establish, maintain and sustain an effective nuclear security regime. The IAEA has adopted a comprehensive approach to nuclear security. This recognizes that an effective national nuclear security regime builds on: the implementation of relevant international legal instruments; information protection; physical protection; material accounting and control; detection of and response to trafficking in such material; national response plans; and contingency measures. With its Nuclear Security Series, the IAEA aims to assist States in implementing and sustaining such a regime in a coherent and integrated manner. The IAEA Nuclear Security Series comprises: Nuclear Security Fundamentals, which include the objective and essential elements of a State's nuclear security regime; Recommendations; Implementing Guides; and Technical Guidance. Each State carries the full responsibility for nuclear security. Specifically, each State has the responsibility to provide for the security of nuclear material and other radioactive material and their associated facilities and activities; to ensure the security of such material in use, storage, or in transport; to combat illicit trafficking and the inadvertent movement of

  14. Objective and Essential Elements of a State's Nuclear Security Regime. Nuclear Security Fundamentals (Arabic Edition)

    International Nuclear Information System (INIS)

    2014-01-01

    The possibility that nuclear material or other radioactive material could be used for criminal purposes or intentionally used in an unauthorized manner cannot be ruled out in the current global situation. States have responded to this risk by engaging in a collective commitment to strengthen the protection and control of such material and to respond effectively to nuclear security events. States have agreed to strengthen existing instruments and have established new international legal instruments to enhance nuclear security worldwide. Nuclear security is fundamental in the management of nuclear technologies and in applications where nuclear material or other radioactive material is used or transported. Through its nuclear security programme, the IAEA supports States to establish, maintain and sustain an effective nuclear security regime. The IAEA has adopted a comprehensive approach to nuclear security. This recognizes that an effective national nuclear security regime builds on: the implementation of relevant international legal instruments; information protection; physical protection; material accounting and control; detection of and response to trafficking in such material; national response plans; and contingency measures. With its Nuclear Security Series, the IAEA aims to assist States in implementing and sustaining such a regime in a coherent and integrated manner. The IAEA Nuclear Security Series comprises: Nuclear Security Fundamentals, which include the objective and essential elements of a State's nuclear security regime; Recommendations; Implementing Guides; and Technical Guidance. Each State carries the full responsibility for nuclear security. Specifically, each State has the responsibility to provide for the security of nuclear material and other radioactive material and their associated facilities and activities; to ensure the security of such material in use, storage, or in transport; to combat illicit trafficking and the inadvertent movement of

  15. Objective and Essential Elements of a State's Nuclear Security Regime. Nuclear Security Fundamentals (Spanish Edition)

    International Nuclear Information System (INIS)

    2014-01-01

    The possibility that nuclear material or other radioactive material could be used for criminal purposes or intentionally used in an unauthorized manner cannot be ruled out in the current global situation. States have responded to this risk by engaging in a collective commitment to strengthen the protection and control of such material and to respond effectively to nuclear security events. States have agreed to strengthen existing instruments and have established new international legal instruments to enhance nuclear security worldwide. Nuclear security is fundamental in the management of nuclear technologies and in applications where nuclear material or other radioactive material is used or transported. Through its nuclear security programme, the IAEA supports States to establish, maintain and sustain an effective nuclear security regime. The IAEA has adopted a comprehensive approach to nuclear security. This recognizes that an effective national nuclear security regime builds on: the implementation of relevant international legal instruments; information protection; physical protection; material accounting and control; detection of and response to trafficking in such material; national response plans; and contingency measures. With its Nuclear Security Series, the IAEA aims to assist States in implementing and sustaining such a regime in a coherent and integrated manner. The IAEA Nuclear Security Series comprises: Nuclear Security Fundamentals, which include the objeurity Fundamentals, which include the objective and essential elements of a State's nuclear security regime; Recommendations; Implementing Guides; and Technical Guidance. Each State carries the full responsibility for nuclear security. Specifically, each State has the responsibility to provide for the security of nuclear material and other radioactive material and their associated facilities and activities; to ensure the security of such material in use, storage, or in transport; to combat illicit

  16. Objective and Essential Elements of a State's Nuclear Security Regime. Nuclear Security Fundamentals (French Edition)

    International Nuclear Information System (INIS)

    2014-01-01

    The possibility that nuclear material or other radioactive material could be used for criminal purposes or intentionally used in an unauthorized manner cannot be ruled out in the current global situation. States have responded to this risk by engaging in a collective commitment to strengthen the protection and control of such material and to respond effectively to nuclear security events. States have agreed to strengthen existing instruments and have established new international legal instruments to enhance nuclear security worldwide. Nuclear security is fundamental in the management of nuclear technologies and in applications where nuclear material or other radioactive material is used or transported. Through its nuclear security programme, the IAEA supports States to establish, maintain and sustain an effective nuclear security regime. The IAEA has adopted a comprehensive approach to nuclear security. This recognizes that an effective national nuclear security regime builds on: the implementation of relevant international legal instruments; information protection; physical protection; material accounting and control; detection of and response to trafficking in such material; national response plans; and contingency measures. With its Nuclear Security Series, the IAEA aims to assist States in implementing and sustaining such a regime in a coherent and integrated manner. The IAEA Nuclear Security Series comprises: Nuclear Security Fundamentals, which include the objective and essential elements of a State's nuclear security regime; Recommendations; Implementing Guides; and Technical Guidance. Each State carries the full responsibility for nuclear security. Specifically, each State has the responsibility to provide for the security of nuclear material and other radioactive material and their associated facilities and activities; to ensure the security of such material in use, storage, or in transport; to combat illicit trafficking and the inadvertent movement of

  17. Phytotoxicology section investigation in the vicinity of the Bruce Nuclear Power Development, the Pickering Nuclear Generating Station and the Darlington Nuclear Generating Station, in October, 1989

    International Nuclear Information System (INIS)

    1991-02-01

    The Phytotoxicology Section, Air Resources Branch is a participant in the Pickering and Bruce Nuclear Contingency Plans. The Phytotoxicology Emergency Response Team is responsible for collecting vegetation samples in the event of a nuclear emergency at any of the nuclear generating stations in the province. As part of its responsibility the Phytotoxicology Section collects samples around the nuclear generating stations for comparison purposes in the event of an emergency. Because of the limited frequency of sampling, the data from the surveys are not intended to be used as part of a regulatory monitoring program. These data represent an effort by the MOE to begin to establish a data base of tritium concentrations in vegetation. The Phytotoxicology Section has carried out seven surveys in the vicinity of Ontario Hydro nuclear generating stations since 1981. Surveys were conducted for tritium in snow in the vicinity of Bruce Nuclear Power Development (BNPD), February, 1981; tritium in cell-free water of white ash in the vicinity of BNPD, September, 1981; tritium in snow in the vicinity of BNPD, March, 1982; tritium in tree sap in the vicinity of BNPD, April, 1982; tritium in tree sap in the vicinity of BNPD, April, 1984, tritium in the cell-free water of white ash in the vicinity of BNPD, September, 1985; and, tritium in cell-free water of grass in the vicinity of Pickering Nuclear Generation Station (PNGS), October 1986. In all cases a pattern of decreasing tritium levels with increasing distance from the stations was observed. In October, 1989, assessment surveys were conducted around Bruce Nuclear Power Development, the Pickering Nuclear Generating Station and the new Darlington Nuclear Generating Station (DNGS). The purpose of these surveys was to provide baseline data for tritium in cell-free water of grass at all three locations at the same time of year. As none of the reactor units at DNGS had been brought on line at the time of the survey, this data was to be

  18. Sound-contingent visual motion aftereffect

    Directory of Open Access Journals (Sweden)

    Kobayashi Maori

    2011-05-01

    Full Text Available Abstract Background After a prolonged exposure to a paired presentation of different types of signals (e.g., color and motion, one of the signals (color becomes a driver for the other signal (motion. This phenomenon, which is known as contingent motion aftereffect, indicates that the brain can establish new neural representations even in the adult's brain. However, contingent motion aftereffect has been reported only in visual or auditory domain. Here, we demonstrate that a visual motion aftereffect can be contingent on a specific sound. Results Dynamic random dots moving in an alternating right or left direction were presented to the participants. Each direction of motion was accompanied by an auditory tone of a unique and specific frequency. After a 3-minutes exposure, the tones began to exert marked influence on the visual motion perception, and the percentage of dots required to trigger motion perception systematically changed depending on the tones. Furthermore, this effect lasted for at least 2 days. Conclusions These results indicate that a new neural representation can be rapidly established between auditory and visual modalities.

  19. Radioactive Reversal? The Fukushima Accident as a Focusing Event for Comparative Policy Change on Nuclear Energy

    Science.gov (United States)

    Sanchez, Victoria Justine

    This dissertation project examines the 2011 Fukushima nuclear accident as a focusing event for policy change on nuclear energy. For example, following the accident, Germany (and much of Europe) experienced a reversal of policy on nuclear energy. Conversely, many others such as China, Russia, and France, did not exhibit such a retraction against nuclear power, albeit with public debate about the risks and consequences of accidents. Why has there been dramatic policy change in some cases but not others? The political and literal fallout of Fukushima has provoked a wave of policy change towards nuclear energy at the national level. Through qualitative and quantitative measures, we can view Fukushima as an impetus for comparing the dynamics of nuclear policy change. Quantitatively, this project employs logistic regression to explore variables such as regime type, energy security, trade supply and demand, climate change concerns, and public acceptance are related to policy outcomes and change on nuclear energy in the post-Fukushima context of 49 different countries. Qualitatively, country cases (Russia, Germany, and Canada) are assessed into three categories based on the outcome of policy decisions on nuclear energy following Fukushima for a richer analysis. Beyond the Fukushima example, we can hope to better understand how political focusing events can gain influence in an international context.

  20. 78 FR 13765 - Federal Acquisition Regulation; Definition of Contingency Operation

    Science.gov (United States)

    2013-02-28

    ... Federal Acquisition Regulation; Definition of Contingency Operation AGENCY: Department of Defense (DoD... Regulation (FAR) to revise the definition of ``contingency operation'' to address the statutory change to the... ``contingency operation'' at FAR 2.101 in accordance with the statutory change to the definition made by...

  1. Decision support tools for urban contingency policy: a scenario approach to risk management of the Vesuvio area in Naples, Italy

    NARCIS (Netherlands)

    Concilio, Grazia; Torrieri, Francesca

    2001-01-01

    Contingency management, in particular the management of unanticipated events outside the control of an ordinary planning system, has in the last 50years become an important andfrequently debated issue in the scientific literature on complex systems management underrisk conditions. The urban system

  2. Contingent Attentional Capture by Conceptually Relevant Images

    Science.gov (United States)

    Wyble, Brad; Folk, Charles; Potter, Mary C.

    2013-01-01

    Attentional capture is an unintentional shift of visuospatial attention to the location of a distractor that is either highly salient, or relevant to the current task set. The latter situation is referred to as contingent capture, in that the effect is contingent on a match between characteristics of the stimuli and the task-defined…

  3. The initiating events in the Loviisa nuclear power plant history

    International Nuclear Information System (INIS)

    Sjoblom, K.

    1987-01-01

    During the 16 reactor years of Loviisa nuclear power plant operation no serious incident has endangered the high level of safety. The initiating events of plant incidents have been analyzed in order to get a view of plant operational safety experience. The initiating events have been placed in categories similar to those that EPRI uses. However, because of the very small number of scrams the study was extended to also cover transients with a relatively low safety importance in order to get more comprehensive statistics. Human errors, which contributed to 15% of the transients, were a special subject in this study. The conditions under which human failures occurred, and the nature and root causes of the human failures that caused the initiating events were analyzed. For future analyses it was noticed that it would be beneficial to analyze incidents immediately, to consult with the persons directly involved and to develop an international standard format for incident analyses

  4. The Effectiveness of Gaze-Contingent Control in Computer Games.

    Science.gov (United States)

    Orlov, Paul A; Apraksin, Nikolay

    2015-01-01

    Eye-tracking technology and gaze-contingent control in human-computer interaction have become an objective reality. This article reports on a series of eye-tracking experiments, in which we concentrated on one aspect of gaze-contingent interaction: Its effectiveness compared with mouse-based control in a computer strategy game. We propose a measure for evaluating the effectiveness of interaction based on "the time of recognition" the game unit. In this article, we use this measure to compare gaze- and mouse-contingent systems, and we present the analysis of the differences as a function of the number of game units. Our results indicate that performance of gaze-contingent interaction is typically higher than mouse manipulation in a visual searching task. When tested on 60 subjects, the results showed that the effectiveness of gaze-contingent systems over 1.5 times higher. In addition, we obtained that eye behavior stays quite stabile with or without mouse interaction. © The Author(s) 2015.

  5. Electrophysiological brain indices of risk behavior modification induced by contingent feedback.

    Science.gov (United States)

    Megías, Alberto; Torres, Miguel Angel; Catena, Andrés; Cándido, Antonio; Maldonado, Antonio

    2018-02-01

    The main aim of this research was to study the effects of response feedback on risk behavior and the neural and cognitive mechanisms involved, as a function of the feedback contingency. Sixty drivers were randomly assigned to one of three feedback groups: contingent, non-contingent and no feedback. The participants' task consisted of braking or not when confronted with a set of risky driving situations, while their electroencephalographic activity was continuously recorded. We observed that contingent feedback, as opposed to non-contingent feedback, promoted changes in the response bias towards safer decisions. This behavioral modification implied a higher demand on cognitive control, reflected in a larger amplitude of the N400 component. Moreover, the contingent feedback, being predictable and entailing more informative value, gave rise to smaller SPN and larger FRN scores when compared with non-contingent feedback. Taken together, these findings provide a new and complex insight into the neurophysiological basis of the influence of feedback contingency on the processing of decision-making under risk. We suggest that response feedback, when contingent upon the risky behavior, appears to improve the functionality of the brain mechanisms involved in decision-making and can be a powerful tool for reducing the tendency to choose risky options in risk-prone individuals. Copyright © 2018 Elsevier B.V. All rights reserved.

  6. Skype me! Socially Contingent Interactions Help Toddlers Learn Language

    OpenAIRE

    Roseberry, Sarah; Hirsh-Pasek, Kathy; Golinkoff, Roberta Michnick

    2013-01-01

    Language learning takes place in the context of social interactions, yet the mechanisms that render social interactions useful for learning language remain unclear. This paper focuses on whether social contingency might support word learning. Toddlers aged 24- to 30-months (N=36) were exposed to novel verbs in one of three conditions: live interaction training, socially contingent video training over video chat, and non-contingent video training (yoked video). Results sugges...

  7. Prediction of accident sequence probabilities in a nuclear power plant due to earthquake events

    International Nuclear Information System (INIS)

    Hudson, J.M.; Collins, J.D.

    1980-01-01

    This paper presents a methodology to predict accident probabilities in nuclear power plants subject to earthquakes. The resulting computer program accesses response data to compute component failure probabilities using fragility functions. Using logical failure definitions for systems, and the calculated component failure probabilities, initiating event and safety system failure probabilities are synthesized. The incorporation of accident sequence expressions allows the calculation of terminal event probabilities. Accident sequences, with their occurrence probabilities, are finally coupled to a specific release category. A unique aspect of the methodology is an analytical procedure for calculating top event probabilities based on the correlated failure of primary events

  8. MATERNAL ANXIETY SYMPTOMS AND MOTHER–INFANT SELF- AND INTERACTIVE CONTINGENCY

    Science.gov (United States)

    Beebe, Beatrice; Steele, Miriam; Jaffe, Joseph; Buck, Karen A.; Chen, Henian; Cohen, Patricia; Kaitz, Marsha; Markese, Sara; Andrews, Howard; Margolis, Amy; Feldstein, Stanley

    2014-01-01

    Associations of maternal self-report anxiety-related symptoms with mother–infant 4-month face-to-face play were investigated in 119 pairs. Attention, affect, spatial orientation, and touch were coded from split-screen videotape on a 1-s time base. Self- and interactive contingency were assessed by time-series methods. Because anxiety symptoms signal emotional dysregulation, we expected to find atypical patterns of mother–infant interactive contingencies, and of degree of stability/lability within an individual’s own rhythms of behavior (self-contingencies). Consistent with our optimum midrange model, maternal anxiety-related symptoms biased the interaction toward interactive contingencies that were both heightened (vigilant) in some modalities and lowered (withdrawn) in others; both may be efforts to adapt to stress. Infant self-contingency was lowered (“destabilized”) with maternal anxiety symptoms; however, maternal self-contingency was both lowered in some modalities and heightened (overly stable) in others. Interactive contingency patterns were characterized by intermodal discrepancies, confusing forms of communication. For example, mothers vigilantly monitored infants visually, but withdrew from contingently coordinating with infants emotionally, as if mothers were “looking through” them. This picture fits descriptions of mothers with anxiety symptoms as overaroused/fearful, leading to vigilance, but dealing with their fear through emotional distancing. Infants heightened facial affect coordination (vigilance), but dampened vocal affect coordination (withdrawal), with mother’s face—a pattern of conflict. The maternal and infant patterns together generated a mutual ambivalence. PMID:25983359

  9. The Impact of the Contingency of Robot Feedback for HRI

    DEFF Research Database (Denmark)

    Fischer, Kerstin; Lohan, Katrin Solveig; Saunders, Joe

    2013-01-01

    robot iCub on a set of shapes and on a stacking task in two conditions, once with socially contingent, nonverbal feedback implemented in response to different gaze and looming behaviors of the human tutor, and once with non-contingent, saliency-based feedback. The results of the analysis of participants......’ linguistic behaviors in the two conditions show that contingency has an impact on the complexity and the pre-structuring of the task for the robot, i.e. on the participants’ tutoring behaviors. Contingency thus plays a considerable role for learning by demonstration....

  10. Probabilistic real-time contingency ranking method

    International Nuclear Information System (INIS)

    Mijuskovic, N.A.; Stojnic, D.

    2000-01-01

    This paper describes a real-time contingency method based on a probabilistic index-expected energy not supplied. This way it is possible to take into account the stochastic nature of the electric power system equipment outages. This approach enables more comprehensive ranking of contingencies and it is possible to form reliability cost values that can form the basis for hourly spot price calculations. The electric power system of Serbia is used as an example for the method proposed. (author)

  11. Several nuclear events during apoptosis depend on caspase-3 activation but do not constitute a common pathway.

    Directory of Open Access Journals (Sweden)

    Lisa Trisciuoglio

    Full Text Available A number of nuclear events occur during apoptosis, including DNA laddering, nuclear lamina breakdown, phosphorylation of histones H2B and histone H2AX, and the tight binding to chromatin of HMGB1 and CAD, the nuclease responsible for DNA laddering. We have performed an epistasis analysis to investigate whether these events cluster together in pathways. We find that all depend directly or indirectly on caspase-3 activation. CAD activation, H2AX phosphorylation and DNA laddering cluster together into a pathway, but all other events appear to be independent of each other downstream of caspase-3, and likely evolved subject to different functional pressures.

  12. On-site habitability in the event of an accident at a nuclear facility

    International Nuclear Information System (INIS)

    1989-01-01

    This publication is intended to provide technical guidance and a methodology for regulatory bodies, designers, constructors and operators of nuclear facilities to assist them in assessing the current situation as regards on-site habitability for their specific nuclear facilities. Initially, the aim will be to ensure that the ''vital areas'' of the facility which are necessary for the safe operation and shutdown of the facility will remain habitable, in some cases continuously and in others transiently, in the event of an accident inside or outside the installation. The assessment procedure can be used not only for potential radiation accidents but also to consider the effects on habitability of those probable non-radiological events which, if not correctly and effectively countered, could lead to the development of potentially unsafe conditions in the facility itself. 30 refs, 4 figs, 8 tabs

  13. Comparison between Japan and the United States in the frequency of events in equipment and components at nuclear power plants

    International Nuclear Information System (INIS)

    Shimada, Yoshio

    2007-01-01

    The Institute of Nuclear Safety System, Incorporated (INSS) conducted trend analyses until 2005 to compare the frequency of events in certain electrical components and instrumentation components at nuclear power plants between Japan and the United States. The results revealed that events have occurred approximately an order of magnitude less often in Japan than in the United States. This paper compared Japan and the United States in more detail in terms of how often events - events reported under the reporting standards of the Nuclear Information Archive (NUCIA) or the Institute of Nuclear Power Operations (INPO) - occurred in electrical components, instrumentation components and mechanical components at nuclear power plants. The results were as follows: (1) In regard to electrical components and instrumentation components, events have occurred one-eighth less frequently in Japan than in the United States, suggesting that the previous results were correct. (2) Events have occurred more often in mechanical components than electrical components and instrumentation components in both Japan and the United States, and there was a smaller difference in the frequency of events in mechanical components between the two countries. (3) Regarding mechanical components, it was found that events in the pipes for critical systems and equipment, such as reactor coolant systems, emergency core cooling systems, instrument and control systems, ventilating and air-conditioning systems, and turbine equipment, have occurred more often in Japan than in the United States. (4) The above observations suggest that there is little scope for reducing the frequency of events in electrical components and instrumentation components, but that mechanical components such as pipes for main systems like emergency core cooling systems and turbine equipment in the case of PWRs, could be improved by re-examining inspection methods and intervals. (author)

  14. IAEA Nuclear Security - Achievements 2002-2011

    International Nuclear Information System (INIS)

    2012-03-01

    The possibility that nuclear or other radioactive material could be used for malicious purposes is real. This calls for a collective commitment to the control of, and accountancy for, material, as well as to adequate levels of protection in order to prevent criminal or unauthorized access to the material or associated facilities. Sharing of knowledge and experience, coordination among States and collaboration with other international organizations, initiatives and industries supports an effective international nuclear security framework. In 2001, the Board of Governors tasked the IAEA with improving nuclear security worldwide. The report that follows provides an overview of accomplishments over the last decade and reflects the importance that States assign to keeping material in the right hands. The IAEA has established a comprehensive nuclear security programme, described first in the Nuclear Security Plan of 2002-2005 and subsequently in the second plan of 2006- 2009. Activities included developing internationally accepted nuclear security guidance, supporting international legal instruments, protecting material and facilities, securing transport and borders, detecting and interdicting illicit nuclear trafficking, strengthening human resource capacity and preparing response plans should a nuclear security event occur. The IAEA has begun the implementation of its third Nuclear Security Plan, to be completed at the end of 2013. This approach to nuclear security recognizes that an effective national nuclear security regime builds on a number of factors: the implementation of relevant international legal instruments; IAEA guidance and standards; information protection; physical protection; material accounting and control; detection of, and response to, trafficking in such material; national response plans and contingency measures. Implemented in a systematic manner, these building blocks make up a sustainable national nuclear security regime and contribute to global

  15. Trend analysis of explosion events at overseas nuclear power plants

    International Nuclear Information System (INIS)

    Shimada, Hiroki

    2008-01-01

    We surveyed failures caused by disasters (e.g., severe storms, heavy rainfall, earthquakes, explosions and fires) which occurred during the 13 years from 1995 to 2007 at overseas nuclear power plants (NPPs) from the nuclear information database of the Institute of Nuclear Safety System. Incorporated (INSS). The results revealed that explosions were the second most frequent type of failure after fires. We conducted a trend analysis on such explosion events. The analysis by equipment, cause, and effect on the plant showed that the explosions occurred mainly at electrical facilities, and thus it is essential to manage the maintenance of electrical facilities for preventing explosions. In addition, it was shown that explosions at transformers and batteries, which have never occurred at Japan's NPPs, accounted for as much as 55% of all explosions. The fact infers that this difference is attributable to the difference in maintenance methods of transformers (condition based maintenance adopted by NPPs) and workforce organization of batteries (inspections performed by utilities' own maintenance workers at NPPs). (author)

  16. Does contingency in adults' responding influence 12-month-old infants' social referencing?

    Science.gov (United States)

    Stenberg, Gunilla

    2017-11-01

    In two experiments we examined the influence of contingent versus non-contingent responding on infant social referencing behavior. EXPERIMENT 1: Forty 12-month-old infants were exposed to an ambiguous toy in a social referencing situation. In one condition an unfamiliar adult who in a previous play situation had responded contingently to the infant's looks gave the infant positive information about the toy. In the other condition an unfamiliar adult who previously had not responded contingently delivered the positive information. EXPERIMENT 2: Forty-eight 12-month-old infants participated in Experiment 2. In this experiment it was examined whether the familiarity of the adult influences infants' reactions to contingency in responding. In one condition a parent who previously had responded contingently to the infant's looks provided positive information about the ambiguous toy, and in the other condition a parent who previously had not responded contingently provided the positive information. The infants looked more at the contingent experimenter in Experimenter 1, and also played more with the toy after receiving positive information from the contingent experimenter. No differences in looking at the parent and in playing with the toy were found in Experiment 2. The results indicate that contingency in responding, as well as the familiarity of the adult, influence infants' social referencing behavior. Copyright © 2017 Elsevier Inc. All rights reserved.

  17. Contingency learning without awareness: evidence for implicit control.

    Science.gov (United States)

    Schmidt, James R; Crump, Matthew J C; Cheesman, Jim; Besner, Derek

    2007-06-01

    The results of four experiments provide evidence for controlled processing in the absence of awareness. Participants identified the colour of a neutral distracter word. Each of four words (e.g., MOVE) was presented in one of the four colours 75% of the time (Experiments 1 and 4) or 50% of the time (Experiments 2 and 3). Colour identification was faster when the words appeared in the colour they were most often presented in relative to when they appeared in another colour, even for participants who were subjectively unaware of any contingencies between the words and the colours. An analysis of sequence effects showed that participants who were unaware of the relation between distracter words and colours nonetheless controlled the impact of the word on performance depending on the nature of the previous trial. A block analysis of contingency-unaware participants revealed that contingencies were learned rapidly in the first block of trials. Experiment 3 showed that the contingency effect does not depend on the level of awareness, thus ruling out explicit strategy accounts. Finally, Experiment 4 showed that the contingency effect results from behavioural control and not from semantic association or stimulus familiarity. These results thus provide evidence for implicit control.

  18. The Contingent Value of Organizational Integration

    Directory of Open Access Journals (Sweden)

    Virpi Turkulainen

    2013-08-01

    Full Text Available We elaborate the link between organizational design and effectiveness by examining organizational integration and performance in the context of modern manufacturing. Through careful contextualization and empirical analysis of 266 manufacturing organizations in three industries and nine countries, we uncover a joint effect of integration and complexity on organizational effectiveness. The results extend structural contingency theory, in particular the mechanisms that link organizational integration to organizational effectiveness. We conclude by discussing the continuing relevance of structural contingency theory.

  19. Distinct changes in CREB phosphorylation in frontal cortex and striatum during contingent and non-contingent performance of a visual attention task

    Directory of Open Access Journals (Sweden)

    Mirjana eCarli

    2011-10-01

    Full Text Available The cyclic-AMP response element binding protein (CREB family of transcription factors has been implicated in numerous forms of behavioural plasticity. We investigated CREB phosphorylation along some nodes of corticostriatal circuitry such as frontal cortex (FC and dorsal (caudate putamen, CPu and ventral (nucleus accumbens, NAC striatum in response to the contingent or non-contingent performance of the five-choice serial reaction time task (5-CSRTT used to assess visuospatial attention. Three experimental manipulations were used; an attentional performance group (contingent, master, a group trained previously on the task but for whom the instrumental contingency coupling responding with stimulus detection and reward was abolished (non-contingent, yoked and a control group matched for food deprivation and exposure to the test apparatus (untrained. Rats trained on the 5-CSRTT (both master and yoked had higher levels of CREB protein in the FC, CPu and NAC compared to untrained controls. Despite the divergent behaviour of master and yoked rats CREB activity in the FC was not substantially different. In rats performing the 5-CSRTT (master, CREB activity was completely abolished in the CPu whereas in the NAC it remained unchanged. In contrast, CREB phosphorylation in CPu and NAC increased only when the contingency changed from goal-dependent to goal-independent reinforcement (yoked. The present results indicate that up-regulation of CREB protein expression across cortical and striatal regions possibly reflects the extensive instrumental learning and performance whereas increased CREB activity in striatal regions may signal the unexpected change in the relationship between instrumental action and reinforcement.

  20. Effectiveness evaluation of contingency sum as a risk management ...

    African Journals Online (AJOL)

    Ethiopian Journal of Environmental Studies and Management ... manage risks prone projects have adopted several methods, one of which is contingency sum. ... initial project cost, cost overrun and percentage allowed for contingency.

  1. Behaviors and Conditions that Challenge Teamwork: An Assessment of Operating Events at U.S. Commercial Nuclear Power Plants

    International Nuclear Information System (INIS)

    Desaulniers, David R.

    1998-01-01

    As part of its regulatory activities, the U.S. Nuclear Regulatory Commission (NRC) reviews events and routine activities at commercial nuclear power facilities throughout the United States. Frequently, these reviews have highlighted team performance as an important factor in either the initiation or mitigation of significant events and conditions at these facilities. This paper summarizes operating experience relevant to the understanding of teamwork at U.S. nuclear power plants during recent years, describes the specific behaviors that were considered detrimental to team performance, and discusses the conditions that were identified as contributing to these behaviors. (author)

  2. Multivariate algorithms for initiating event detection and identification in nuclear power plants

    International Nuclear Information System (INIS)

    Wu, Shun-Chi; Chen, Kuang-You; Lin, Ting-Han; Chou, Hwai-Pwu

    2018-01-01

    Highlights: •Multivariate algorithms for NPP initiating event detection and identification. •Recordings from multiple sensors are simultaneously considered for detection. •Both spatial and temporal information is used for event identification. •Untrained event isolation avoids falsely relating an untrained event. •Efficacy of the algorithms is verified with data from the Maanshan NPP simulator. -- Abstract: To prevent escalation of an initiating event into a severe accident, promptly detecting its occurrence and precisely identifying its type are essential. In this study, several multivariate algorithms for initiating event detection and identification are proposed to help maintain safe operations of nuclear power plants (NPPs). By monitoring changes in the NPP sensing variables, an event is detected when the preset thresholds are exceeded. Unlike existing approaches, recordings from sensors of the same type are simultaneously considered for detection, and no subjective reasoning is involved in setting these thresholds. To facilitate efficient event identification, a spatiotemporal feature extractor is proposed. The extracted features consist of the temporal traits used by existing techniques and the spatial signature of an event. Through an F-score-based feature ranking, only those that are most discriminant in classifying the events under consideration will be retained for identification. Moreover, an untrained event isolation scheme is introduced to avoid relating an untrained event to those in the event dataset so that improper recovery actions can be prevented. Results from experiments containing data of 12 event classes and a total of 125 events generated using a Taiwan’s Maanshan NPP simulator are provided to illustrate the efficacy of the proposed algorithms.

  3. Province of Ontario nuclear emergency plan. Pt. 1

    International Nuclear Information System (INIS)

    1986-06-01

    The Province of Ontario Nuclear Emergency Plan has been developed pursuant to Section 8 of the Emergency Plans Act, 1983. This plan replaces the Province of Ontario Nuclear Contingency Off-Site Plan (June 1980) which is no longer applicable. The wastes plan includes planning, preparation, emergency organization and operational responsibilities and policy

  4. Evaluation of corrective action data for reportable events at commercial nuclear power plants

    International Nuclear Information System (INIS)

    Mays, G.T.

    1991-01-01

    805The Nuclear Regulatory Commission (NRC) approved the adoption of cause codes for reportable events as a new performance indicator (PI) in March 1989. Corrective action data associated with the causes of events were to be compiled also. The corrective action data was considered as supplemental information but not identified formally as a performance indicator. In support of NRC, the Nuclear Operations Analysis Center (NOAC) at the Oak Ridge National Laboratory (ORNL) has been routinely evaluating licensee event reports (LERs) for cause code and corrective action data since 1989. The compilation of corrective action data by NOAC represents the first systematic and comprehensive compilation of this type data. The thrust of analyzing the corrective action data was to identify areas where licensees allocated resources to solve problems and prevent the recurrence of personnel errors and equipment failures. The predominant areas of corrective action reported by licensees are to be evaluated by NRC to compare with NRC programs designed to improve plant performance. The set of corrective action codes used to correlate with individual cause codes and included in the analyses were: training, procedural modification, corrective discipline, management change, design modification, equipment replacement/adjustment, other, and unknown. 1 fig

  5. Contingent capture effects in temporal order judgments.

    Science.gov (United States)

    Born, Sabine; Kerzel, Dirk; Pratt, Jay

    2015-08-01

    The contingent attentional capture hypothesis proposes that visual stimuli that do not possess characteristics relevant for the current task will not capture attention, irrespective of their bottom-up saliency. Typically, contingent capture is tested in a spatial cuing paradigm, comparing manual reaction times (RTs) across different conditions. However, attention may act through several mechanisms and RTs may not be ideal to disentangle those different components. In 3 experiments, we examined whether color singleton cues provoke cuing effects in temporal order judgments (TOJs) and whether they would be contingent on attentional control sets. Experiment 1 showed that color singleton cues indeed produce cuing effects in TOJs, even in a cluttered and dynamic target display containing multiple heterogeneous distractors. In Experiment 2, consistent with contingent capture, we observed reliable cuing effects only when the singleton cue matched participants' current attentional control set. Experiment 3 suggests that a sensory interaction account of the differences found in Experiment 2 is unlikely. Our results help to discern the attentional components that may play a role in contingent capture. Further, we discuss a number of other effects (e.g., reversed cuing effects) that are found in RTs, but so far have not been reported in TOJs. Those differences suggest that RTs are influenced by a multitude of mechanisms; however, not all of these mechanisms may affect TOJs. We conclude by highlighting how the study of attentional capture in TOJs provides valuable insights for the attention literature, but also for studies concerned with the perceived timing between stimuli. (c) 2015 APA, all rights reserved).

  6. 25 CFR 39.502 - How does a school apply for contingency funds?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false How does a school apply for contingency funds? 39.502... EQUALIZATION PROGRAM Contingency Fund § 39.502 How does a school apply for contingency funds? To apply for contingency funds, a school must send a request to the ELO. The ELO must send the request to the Director for...

  7. The detection of contingency and animacy from simple animations in the human brain.

    Science.gov (United States)

    Blakemore, S-J; Boyer, P; Pachot-Clouard, M; Meltzoff, A; Segebarth, C; Decety, J

    2003-08-01

    Contingencies between objects and people can be mechanical or intentional-social in nature. In this fMRI study we used simplified stimuli to investigate brain regions involved in the detection of mechanical and intentional contingencies. Using a factorial design we manipulated the 'animacy' and 'contingency' of stimulus movement, and the subject's attention to the contingencies. The detection of mechanical contingency between shapes whose movement was inanimate engaged the middle temporal gyrus and right intraparietal sulcus. The detection of intentional contingency between shapes whose movement was animate activated superior parietal networks bilaterally. These activations were unaffected by attention to contingency. Additional regions, the right middle frontal gyrus and left superior temporal sulcus, became activated by the animate-contingent stimuli when subjects specifically attended to the contingent nature of the stimuli. Our results help to clarify neural networks previously associated with 'theory of mind' and agency detection. In particular, the results suggest that low-level perception of agency in terms of objects reacting to other objects at a distance is processed by parietal networks. In contrast, the activation of brain regions traditionally associated with theory of mind tasks appears to require attention to be directed towards agency and contingency.

  8. CW-FIT: Group Contingency Effects across the Day

    Science.gov (United States)

    Wills, Howard P.; Iwaszuk, Wendy M.; Kamps, Debra; Shumate, Emily

    2014-01-01

    This study explored the effects of a group-contingency intervention on student behavior across academic instructional periods. Research suggests group contingencies are evidence-based practices, yet calls for investigation to determine the best conditions and groups suited for this type of intervention. CW-FIT (Class-Wide Function-related…

  9. Matrix of Aspects and Environmental Impacts as a Tool of Disclosure of Environmental Contingencies

    Directory of Open Access Journals (Sweden)

    Diene Hellmann Pereira

    2014-08-01

    Full Text Available Companies that, as a result of their activities, cause an impact on the environment may incur environmental contingencies. Depending on the extent of the impact and the likelihood of future monetary obligations, accounting standards determine situations in which the company shall disclose such events in the explanatory notes. To contribute to this topic, this article aims to verify how a matrix of aspects and environmental impacts can contribute to the accounting disclosure of environmental contingencies for resellers in gas stations. To achieve this, this study used a matrix formed by information regarding the aspects and environmental impacts, in which were considered the scope, severity, and frequency of occurrence of each analyzed situation. The results show that instances of environmental impact in the business environment might be followed through the matrix of environmental aspects and impacts, and that this tool can help in judging which information is subject to disclosure in the notes.

  10. Skype me! Socially contingent interactions help toddlers learn language.

    Science.gov (United States)

    Roseberry, Sarah; Hirsh-Pasek, Kathy; Golinkoff, Roberta M

    2014-01-01

    Language learning takes place in the context of social interactions, yet the mechanisms that render social interactions useful for learning language remain unclear. This study focuses on whether social contingency might support word learning. Toddlers aged 24-30 months (N = 36) were exposed to novel verbs in one of three conditions: live interaction training, socially contingent video training over video chat, and noncontingent video training (yoked video). Results suggest that children only learned novel verbs in socially contingent interactions (live interactions and video chat). This study highlights the importance of social contingency in interactions for language learning and informs the literature on learning through screen media as the first study to examine word learning through video chat technology. © 2013 The Authors. Child Development © 2013 Society for Research in Child Development, Inc.

  11. A Review of the Research on Response to Improvised Nuclear Device Events

    Energy Technology Data Exchange (ETDEWEB)

    Bentz, A; Buddemeier, B; Dombroski, M

    2008-07-01

    Following the events of September 11, a litany of imaginable horribles was trotted out before an anxious and concerned public. To date, government agencies and academics are still grappling with how to best respond to such catastrophes, and as Senator Lieberman's quote says above, now is the time to plan and prepare for such events. One of the nation's worst fears is that terrorists might detonate an improvised nuclear device (IND) in an American city. With 9/11 serving as the catalyst, the government and many NGOs have invested money into research and development of response capabilities throughout the country. Yet, there is still much to learn about how to best respond to an IND event. Understanding the state of knowledge, identifying gaps, and making recommendations for how to fill those gaps, this paper will provide a framework under which past findings can be understood and future research can fit. The risk of an improvised nuclear device (IND) detonation may seem unlikely; and while this is hopefully true, due to its destructive capability, IND events must be prepared for. Many people still live under the Cold War mentality that if a city is attacked with a nuclear weapon, there is little chance of survival. This assumption, while perhaps true in the case of multiple, thermonuclear weapons exchanges, does not hold for the current threat. If a single IND were detonated in the United States, there would be many casualties at the point of impact; however, there would also be many survivors and the initial response by two major groups will mean the difference between life and death for many people. These groups are the first responders and the public. Understanding how these two groups prepare, react and interact will improve response to nuclear terrorism. Figure 1 provides a visualization of the response timeline of an IND event. For the purposes of this assessment, it is assumed that to accurately inform the public, three functions need to be

  12. Experience feedback of operational events of the control rod assembly and its drive mechanism in nuclear power plants

    International Nuclear Information System (INIS)

    Zhou Hong; Xiao Zhi; Tao Shusheng; Zheng Lixin; Chen Zhaolin

    2013-01-01

    Seventeen operational events of the control rod assembly and its drive mechanism are collected from 1992 to 2012 important nuclear operational events and feedback in referred nuclear power plants. After investigated and classified, several important issues, such as the impact of control rod swell and fuel assembly distortion, control rod drive mechanism leakage, and the control system reliability of control rod, are emphatically analyzed. Some suggestions of experience feedback are proposed. (authors)

  13. The Role of Relational Information in Contingent Capture

    Science.gov (United States)

    Becker, Stefanie I.; Folk, Charles L.; Remington, Roger W.

    2010-01-01

    On the contingent capture account, top-down attentional control settings restrict involuntary attentional capture to items that match the features of the search target. Attention capture is involuntary, but contingent on goals and intentions. The observation that only target-similar items can capture attention has usually been taken to show that…

  14. Use of the contingency matrix in the TRACK-MATCH procedure for two projections

    International Nuclear Information System (INIS)

    Baginyan, S.A.; Moroz, V.I.

    1985-01-01

    When analysing the work of geometrical reconstruction programs it is noted that if the TRACK-MATCH procedure is successful, it garantes the event measurement correctness. This serves as a base for application of the TRACK-MATCH procedure as a test for event mask measurements. Such use of the procedure does not require point-to-point correspondence between track images in different projections. It is sufficient to establish that the TRACK-MATCH procedure admits a solusion. It is shown that the problem of point-to-point correspondence between track images in different projections is reduced to conting matrix analysis. It is stated that if the determinant of the contingency matrix is not equal to zero it is sufficient for the TRACK-MATCH procedure to be solved

  15. Objective and Essential Elements of a State's Nuclear Security Regime. Nuclear Security Fundamentals (Spanish Edition); Objetivo y elementos esenciales del régimen de seguridad física nuclear de un Estado. Nociones fundamentales de seguridad física nuclear

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2014-10-15

    The possibility that nuclear material or other radioactive material could be used for criminal purposes or intentionally used in an unauthorized manner cannot be ruled out in the current global situation. States have responded to this risk by engaging in a collective commitment to strengthen the protection and control of such material and to respond effectively to nuclear security events. States have agreed to strengthen existing instruments and have established new international legal instruments to enhance nuclear security worldwide. Nuclear security is fundamental in the management of nuclear technologies and in applications where nuclear material or other radioactive material is used or transported. Through its nuclear security programme, the IAEA supports States to establish, maintain and sustain an effective nuclear security regime. The IAEA has adopted a comprehensive approach to nuclear security. This recognizes that an effective national nuclear security regime builds on: the implementation of relevant international legal instruments; information protection; physical protection; material accounting and control; detection of and response to trafficking in such material; national response plans; and contingency measures. With its Nuclear Security Series, the IAEA aims to assist States in implementing and sustaining such a regime in a coherent and integrated manner. The IAEA Nuclear Security Series comprises: Nuclear Security Fundamentals, which include the objeurity Fundamentals, which include the objective and essential elements of a State's nuclear security regime; Recommendations; Implementing Guides; and Technical Guidance. Each State carries the full responsibility for nuclear security. Specifically, each State has the responsibility to provide for the security of nuclear material and other radioactive material and their associated facilities and activities; to ensure the security of such material in use, storage, or in transport; to combat illicit

  16. Contingency Contracting within the Department of Defense: A Comparative Analysis

    National Research Council Canada - National Science Library

    McMillion, Chester

    2000-01-01

    .... The thesis compares and contrasts the regulations governing the contingency contracting operations, the organization structure, contingency contracting support plans, and the training requirements...

  17. 48 CFR 403.405 - Misrepresentations or violations of the Covenant Against Contingent Fees.

    Science.gov (United States)

    2010-10-01

    ... violations of the Covenant Against Contingent Fees. 403.405 Section 403.405 Federal Acquisition Regulations... Contingent Fees 403.405 Misrepresentations or violations of the Covenant Against Contingent Fees. (a) A suspected misrepresentation or violation of the Covenant Against Contingent Fees shall be documented in...

  18. Dengue Contingency Planning: From Research to Policy and Practice

    Science.gov (United States)

    Runge-Ranzinger, Silvia; Kroeger, Axel; Olliaro, Piero; McCall, Philip J.; Sánchez Tejeda, Gustavo; Lloyd, Linda S.; Hakim, Lokman; Bowman, Leigh R.; Horstick, Olaf; Coelho, Giovanini

    2016-01-01

    Background Dengue is an increasingly incident disease across many parts of the world. In response, an evidence-based handbook to translate research into policy and practice was developed. This handbook facilitates contingency planning as well as the development and use of early warning and response systems for dengue fever epidemics, by identifying decision-making processes that contribute to the success or failure of dengue surveillance, as well as triggers that initiate effective responses to incipient outbreaks. Methodology/Principal findings Available evidence was evaluated using a step-wise process that included systematic literature reviews, policymaker and stakeholder interviews, a study to assess dengue contingency planning and outbreak management in 10 countries, and a retrospective logistic regression analysis to identify alarm signals for an outbreak warning system using datasets from five dengue endemic countries. Best practices for managing a dengue outbreak are provided for key elements of a dengue contingency plan including timely contingency planning, the importance of a detailed, context-specific dengue contingency plan that clearly distinguishes between routine and outbreak interventions, surveillance systems for outbreak preparedness, outbreak definitions, alert algorithms, managerial capacity, vector control capacity, and clinical management of large caseloads. Additionally, a computer-assisted early warning system, which enables countries to identify and respond to context-specific variables that predict forthcoming dengue outbreaks, has been developed. Conclusions/Significance Most countries do not have comprehensive, detailed contingency plans for dengue outbreaks. Countries tend to rely on intensified vector control as their outbreak response, with minimal focus on integrated management of clinical care, epidemiological, laboratory and vector surveillance, and risk communication. The Technical Handbook for Surveillance, Dengue Outbreak

  19. Application of Recommended Design Practices for Conceptual Nuclear Fusion Space Propulsion Systems

    Science.gov (United States)

    Williams, Craig H.

    2004-01-01

    An AIAA Special Project Report was recently produced by AIAA's Nuclear and Future Flight Propulsion Technical Committee and is currently in peer review. The Report provides recommended design practices for conceptual engineering studies of nuclear fusion space propulsion systems. Discussion and recommendations are made on key topics including design reference missions, degree of technological extrapolation and concomitant risk, thoroughness in calculating mass properties (nominal mass properties, weight-growth contingency and propellant margins, and specific impulse), and thoroughness in calculating power generation and usage (power-flow, power contingencies, specific power). The report represents a general consensus of the nuclear fusion space propulsion system conceptual design community and proposes 15 recommendations. This paper expands on the Report by providing specific examples illustrating how to apply each of the recommendations.

  20. Disruptive event uncertainties in a perturbation approach to nuclear waste repository risk analysis

    Energy Technology Data Exchange (ETDEWEB)

    Harvey, T.F.

    1980-09-01

    A methodology is developed for incorporating a full range of the principal forecasting uncertainties into a risk analysis of a nuclear waste repository. The result of this methodology is a set of risk curves similar to those used by Rasmussen in WASH-1400. The set of curves is partially derived from a perturbation approach to analyze potential disruptive event sequences. Such a scheme could be useful in truncating the number of disruptive event scenarios and providing guidance to those establishing data-base development priorities.

  1. Comparison of accuracy in predicting emotional instability from MMPI data: fisherian versus contingent probability statistics

    Energy Technology Data Exchange (ETDEWEB)

    Berghausen, P.E. Jr.; Mathews, T.W.

    1987-01-01

    The security plans of nuclear power plants generally require that all personnel who are to have access to protected areas or vital islands be screened for emotional stability. In virtually all instances, the screening involves the administration of one or more psychological tests, usually including the Minnesota Multiphasic Personality Inventory (MMPI). At some plants, all employees receive a structured clinical interview after they have taken the MMPI and results have been obtained. At other plants, only those employees with dirty MMPI are interviewed. This latter protocol is referred to as interviews by exception. Behaviordyne Psychological Corp. has succeeded in removing some of the uncertainty associated with interview-by-exception protocols by developing an empirically based, predictive equation. This equation permits utility companies to make informed choices regarding the risks they are assuming. A conceptual problem exists with the predictive equation, however. Like most predictive equations currently in use, it is based on Fisherian statistics, involving least-squares analyses. Consequently, Behaviordyne Psychological Corp., in conjunction with T.W. Mathews and Associates, has just developed a second predictive equation, one based on contingent probability statistics. The particular technique used in the multi-contingent analysis of probability systems (MAPS) approach. The present paper presents a comparison of predictive accuracy of the two equations: the one derived using Fisherian techniques versus the one thing contingent probability techniques.

  2. Comparison of accuracy in predicting emotional instability from MMPI data: fisherian versus contingent probability statistics

    International Nuclear Information System (INIS)

    Berghausen, P.E. Jr.; Mathews, T.W.

    1987-01-01

    The security plans of nuclear power plants generally require that all personnel who are to have access to protected areas or vital islands be screened for emotional stability. In virtually all instances, the screening involves the administration of one or more psychological tests, usually including the Minnesota Multiphasic Personality Inventory (MMPI). At some plants, all employees receive a structured clinical interview after they have taken the MMPI and results have been obtained. At other plants, only those employees with dirty MMPI are interviewed. This latter protocol is referred to as interviews by exception. Behaviordyne Psychological Corp. has succeeded in removing some of the uncertainty associated with interview-by-exception protocols by developing an empirically based, predictive equation. This equation permits utility companies to make informed choices regarding the risks they are assuming. A conceptual problem exists with the predictive equation, however. Like most predictive equations currently in use, it is based on Fisherian statistics, involving least-squares analyses. Consequently, Behaviordyne Psychological Corp., in conjunction with T.W. Mathews and Associates, has just developed a second predictive equation, one based on contingent probability statistics. The particular technique used in the multi-contingent analysis of probability systems (MAPS) approach. The present paper presents a comparison of predictive accuracy of the two equations: the one derived using Fisherian techniques versus the one thing contingent probability techniques

  3. Category learning in the color-word contingency learning paradigm.

    Science.gov (United States)

    Schmidt, James R; Augustinova, Maria; De Houwer, Jan

    2018-04-01

    In the typical color-word contingency learning paradigm, participants respond to the print color of words where each word is presented most often in one color. Learning is indicated by faster and more accurate responses when a word is presented in its usual color, relative to another color. To eliminate the possibility that this effect is driven exclusively by the familiarity of item-specific word-color pairings, we examine whether contingency learning effects can be observed also when colors are related to categories of words rather than to individual words. To this end, the reported experiments used three categories of words (animals, verbs, and professions) that were each predictive of one color. Importantly, each individual word was presented only once, thus eliminating individual color-word contingencies. Nevertheless, for the first time, a category-based contingency effect was observed, with faster and more accurate responses when a category item was presented in the color in which most of the other items of that category were presented. This finding helps to constrain episodic learning models and sets the stage for new research on category-based contingency learning.

  4. Acquisition of automatic imitation is sensitive to sensorimotor contingency.

    Science.gov (United States)

    Cook, Richard; Press, Clare; Dickinson, Anthony; Heyes, Cecilia

    2010-08-01

    The associative sequence learning model proposes that the development of the mirror system depends on the same mechanisms of associative learning that mediate Pavlovian and instrumental conditioning. To test this model, two experiments used the reduction of automatic imitation through incompatible sensorimotor training to assess whether mirror system plasticity is sensitive to contingency (i.e., the extent to which activation of one representation predicts activation of another). In Experiment 1, residual automatic imitation was measured following incompatible training in which the action stimulus was a perfect predictor of the response (contingent) or not at all predictive of the response (noncontingent). A contingency effect was observed: There was less automatic imitation indicative of more learning in the contingent group. Experiment 2 replicated this contingency effect and showed that, as predicted by associative learning theory, it can be abolished by signaling trials in which the response occurs in the absence of an action stimulus. These findings support the view that mirror system development depends on associative learning and indicate that this learning is not purely Hebbian. If this is correct, associative learning theory could be used to explain, predict, and intervene in mirror system development.

  5. Contingency learning in alcohol dependence and pathological gambling: learning and unlearning reward contingencies

    NARCIS (Netherlands)

    Vanes, L.D.; Holst, R.J. van; Jansen, J.M.; Brink, W. van den; Oosterlaan, J.; Goudriaan, A.E.

    2014-01-01

    BACKGROUND: Patients with alcohol dependence (AD) and pathological gambling (PG) are characterized by dysfunctional reward processing and their ability to adapt to alterations of reward contingencies is impaired. However, most neurocognitive tasks investigating reward processing involve a complex

  6. Contingency Learning in Alcohol Dependence and Pathological Gambling: Learning and Unlearning Reward Contingencies

    NARCIS (Netherlands)

    Vanes, L.D.; Holst, R.; Jansen, J.D.; van den Brink, W.A.; Oosterlaan, J.; Goudriaan, A.E.

    2014-01-01

    Background: Patients with alcohol dependence (AD) and pathological gambling (PG) are characterized by dysfunctional reward processing and their ability to adapt to alterations of reward contingencies is impaired. However, most neurocognitive tasks investigating reward processing involve a complex

  7. 75 FR 27986 - Electronic Filing System-Web (EFS-Web) Contingency Option

    Science.gov (United States)

    2010-05-19

    ...] Electronic Filing System--Web (EFS-Web) Contingency Option AGENCY: United States Patent and Trademark Office... contingency option when the primary portal to EFS-Web has an unscheduled outage. Previously, the entire EFS-Web system is not available to the users during such an outage. The contingency option in EFS-Web will...

  8. The Graduate School and Its Organizational Structure: A Contingency Theory Approach.

    Science.gov (United States)

    Sanford, Judith Babcock

    Contingency theory, the formal structure of graduate schools, and the applicability of contingency variables to graduate schools as organizations are examined. Contingency theory is based on an open systems concept that views an organization as composed of many interdependent parts that are interacting with one another. It also holds that under…

  9. Contingency Table Browser - prediction of early stage protein structure.

    Science.gov (United States)

    Kalinowska, Barbara; Krzykalski, Artur; Roterman, Irena

    2015-01-01

    The Early Stage (ES) intermediate represents the starting structure in protein folding simulations based on the Fuzzy Oil Drop (FOD) model. The accuracy of FOD predictions is greatly dependent on the accuracy of the chosen intermediate. A suitable intermediate can be constructed using the sequence-structure relationship information contained in the so-called contingency table - this table expresses the likelihood of encountering various structural motifs for each tetrapeptide fragment in the amino acid sequence. The limited accuracy with which such structures could previously be predicted provided the motivation for a more indepth study of the contingency table itself. The Contingency Table Browser is a tool which can visualize, search and analyze the table. Our work presents possible applications of Contingency Table Browser, among them - analysis of specific protein sequences from the point of view of their structural ambiguity.

  10. Evaluation of external hazards to nuclear power plants in the United States: Other external events

    International Nuclear Information System (INIS)

    Kimura, C.Y.; Prassinos, P.G.

    1989-02-01

    In support of implementation of the Nuclear Regulatory Commission's Severe Accident Policy, the Lawrence Livermore National Laboratory (LLNL) has performed a study of the risk of core damage to nuclear power plants in the United States due to ''other external events.'' The broad objective has been to gain an understanding of whether ''other external events'' (the hazards not covered by previous reports) are among the major potential accident initiators that may pose a threat of severe reactor core damage or of large radioactive release to the environment from the reactor. The ''other external events'' covered in this report are nearby industrial/military facility accidents, on site hazardous material storage accidents, severe temperature transients, severe weather storms, lightning strikes, external fires, extraterrestrial activity, volcanic activity, earth movement, and abrasive windstorms. The analysis was based on two figures-of-merit, one based on core damage frequency and the other based on the frequency of large radioactive releases. 37 refs., 8 tabs

  11. Advanced Mechanistic 3D Spatial Modeling and Analysis Methods to Accurately Represent Nuclear Facility External Event Scenarios

    Energy Technology Data Exchange (ETDEWEB)

    Sezen, Halil [The Ohio State Univ., Columbus, OH (United States). Dept. of Civil, Environmental and Geodetic Engineering; Aldemir, Tunc [The Ohio State Univ., Columbus, OH (United States). College of Engineering, Nuclear Engineering Program, Dept. of Mechanical and Aerospace Engineering; Denning, R. [The Ohio State Univ., Columbus, OH (United States); Vaidya, N. [Rizzo Associates, Pittsburgh, PA (United States)

    2017-12-29

    Probabilistic risk assessment of nuclear power plants initially focused on events initiated by internal faults at the plant, rather than external hazards including earthquakes and flooding. Although the importance of external hazards risk analysis is now well recognized, the methods for analyzing low probability external hazards rely heavily on subjective judgment of specialists, often resulting in substantial conservatism. This research developed a framework to integrate the risk of seismic and flooding events using realistic structural models and simulation of response of nuclear structures. The results of four application case studies are presented.

  12. Development of BWR [boiling water reactor] and PWR [pressurized water reactor] event descriptions for nuclear facility simulator training

    International Nuclear Information System (INIS)

    Carter, R.J.; Bovell, C.R.

    1987-01-01

    A number of tools that can aid nuclear facility training developers in designing realistic simulator scenarios have been developed. This paper describes each of the tools, i.e., event lists, events-by-competencies matrices, and event descriptions, and illustrates how the tools can be used to construct scenarios

  13. Dissociating Contingency Awareness and Conditioned Attitudes: Evidence of Contingency-Unaware Evaluative Conditioning

    Science.gov (United States)

    Hutter, Mandy; Sweldens, Steven; Stahl, Christoph; Unkelbach, Christian; Klauer, Karl Christoph

    2012-01-01

    Whether human evaluative conditioning can occur without contingency awareness has been the subject of an intense and ongoing debate for decades, troubled by a wide array of methodological difficulties. Following recent methodological innovations, the available evidence currently points to the conclusion that evaluative conditioning effects do not…

  14. Color and Contingency in Robert Boyle's Works.

    Science.gov (United States)

    Baker, Tawrin

    2015-01-01

    This essay investigates the relationship between color and contingency in Robert Boyle's Experiments and Considerations Touching Colours (1664) and his essays on the unsuccessfulness of experiments in Certain Physiological Essays (1661). In these two works Boyle wrestles with a difficult practical and philosophical problem with experiments, which he calls the problem of contingency. In Touching Colours, the problem of contingency is magnified by the much-debated issue of whether color had any deep epistemic importance. His limited theoretical principle guiding him in Touching Colours, that color is but modified light, further exacerbated the problem. Rather than theory, Boyle often relied on craftsmen, whose mastery of color phenomena was, Boyle mentions, brought about by economic forces, to determine when colors were indicators of important 'inward' properties of substances, and thus to secure a solid foundation for his experimental history of color.

  15. Distinct Motivational Effects of Contingent and Noncontingent Rewards.

    Science.gov (United States)

    Manohar, Sanjay G; Finzi, Rebecca Dawn; Drew, Daniel; Husain, Masud

    2017-07-01

    When rewards are available, people expend more energy, increasing their motivational vigor. In theory, incentives might drive behavior for two distinct reasons: First, they increase expected reward; second, they increase the difference in subjective value between successful and unsuccessful performance, which increases contingency-the degree to which action determines outcome. Previous studies of motivational vigor have never compared these directly. Here, we indexed motivational vigor by measuring the speed of eye movements toward a target after participants heard a cue indicating how outcomes would be determined. Eye movements were faster when the cue indicated that monetary rewards would be contingent on performance than when the cue indicated that rewards would be random. But even when the cue indicated that a reward was guaranteed regardless of speed, movement was still faster than when no reward was available. Motivation by contingent and certain rewards was uncorrelated across individuals, which suggests that there are two separable, independent components of motivation. Contingent motivation generated autonomic arousal, and unlike noncontingent motivation, was effective with penalties as well as rewards.

  16. Contingency learning in alcohol dependence and pathological gambling: learning and unlearning reward contingencies

    NARCIS (Netherlands)

    Vanes, Lucy D.; van Holst, Ruth J.; Jansen, Jochem M.; van den Brink, Wim; Oosterlaan, Jaap; Goudriaan, Anna E.

    2014-01-01

    Patients with alcohol dependence (AD) and pathological gambling (PG) are characterized by dysfunctional reward processing and their ability to adapt to alterations of reward contingencies is impaired. However, most neurocognitive tasks investigating reward processing involve a complex mix of

  17. Analysis of internal events for the Unit 1 of the Laguna Verde Nuclear Power Station. Appendixes

    International Nuclear Information System (INIS)

    Huerta B, A.; Lopez M, R.

    1995-01-01

    This volume contains the appendices for the accident sequences analysis for those internally initiated events for Laguna Verde Unit 1, Nuclear Power Plant. The appendix A presents the comments raised by the Sandia National Laboratories technical staff as a result of the review of the Internal Event Analysis for Laguna Verde Unit 1 Nuclear Power Plant. This review was performed during a joint Sandia/CNSNS multi-day meeting by the end 1992. Also included is a brief evaluation on the applicability of these comments to the present study. The appendix B presents the fault tree models printed for each of the systems included and.analyzed in the Internal Event Analysis for LVNPP. The appendice C presents the outputs of the TEMAC code, used for the cuantification of the dominant accident sequences as well as for the final core damage evaluation. (Author)

  18. Analysis of internal events for the Unit 1 of the Laguna Verde Nuclear Power Station. Appendixes

    International Nuclear Information System (INIS)

    Huerta B, A.; Lopez M, R.

    1995-01-01

    This volume contains the appendices for the accident sequences analysis for those internally initiated events for Laguna Verde Unit 1, Nuclear Power Plant. The appendix A presents the comments raised by the Sandia National Laboratories technical staff as a result of the review of the Internal Event Analysis for Laguna Verde Unit 1 Nuclear Power Plant. This review was performed during a joint Sandia/CNSNS multi-day meeting by the end 1992. Also included is a brief evaluation on the applicability of these comments to the present study. The appendix B presents the fault tree models printed for each of the systems included and analyzed in the Internal Event Analysis for LVNPP. The appendice C presents the outputs of the TEMAC code, used for the cuantification of the dominant accident sequences as well as for the final core damage evaluation. (Author)

  19. Just and reasonable distribution of funds for limited damages in the event of nuclear disasters

    International Nuclear Information System (INIS)

    Schattke, H.

    1985-01-01

    A suggestion is made to make legal dispositions for the distribution of funds before a nuclear event. The concept incorporates the following material-legal elements: Proportionate reduction of damages compensation claims in case the funds for liability and coverage are insufficient; creation of reserve funds for late damage; legal preference of personal damage and only subsequent satisfaction of demand for compensation of nuclear industries. (orig.) [de

  20. ACCOUNTING FOR CONTINGENT CONSIDERATIONS IN BUSINESS COMBINATIONS

    OpenAIRE

    Gurgen KALASHYAN

    2017-01-01

    According to IFRS 3 Business Combinations contingent considerations must be included in the total consideration given for the acquired entity along with cash, other assets, ordinary or preference equity instruments, options, warrants. The contingent consideration is the determined amount which acquiring entity has to pay to acquired entity provided, that certain conditions will be fulfilled in the future. In case the provisions are not satisfied, we will get the situation when the amount of c...

  1. Internal event analysis for Laguna Verde Unit 1 Nuclear Power Plant. Accident sequence quantification and results

    International Nuclear Information System (INIS)

    Huerta B, A.; Aguilar T, O.; Nunez C, A.; Lopez M, R.

    1994-01-01

    The Level 1 results of Laguna Verde Nuclear Power Plant PRA are presented in the I nternal Event Analysis for Laguna Verde Unit 1 Nuclear Power Plant, CNSNS-TR 004, in five volumes. The reports are organized as follows: CNSNS-TR 004 Volume 1: Introduction and Methodology. CNSNS-TR4 Volume 2: Initiating Event and Accident Sequences. CNSNS-TR 004 Volume 3: System Analysis. CNSNS-TR 004 Volume 4: Accident Sequence Quantification and Results. CNSNS-TR 005 Volume 5: Appendices A, B and C. This volume presents the development of the dependent failure analysis, the treatment of the support system dependencies, the identification of the shared-components dependencies, and the treatment of the common cause failure. It is also presented the identification of the main human actions considered along with the possible recovery actions included. The development of the data base and the assumptions and limitations in the data base are also described in this volume. The accident sequences quantification process and the resolution of the core vulnerable sequences are presented. In this volume, the source and treatment of uncertainties associated with failure rates, component unavailabilities, initiating event frequencies, and human error probabilities are also presented. Finally, the main results and conclusions for the Internal Event Analysis for Laguna Verde Nuclear Power Plant are presented. The total core damage frequency calculated is 9.03x 10-5 per year for internal events. The most dominant accident sequences found are the transients involving the loss of offsite power, the station blackout accidents, and the anticipated transients without SCRAM (ATWS). (Author)

  2. External man-induced events in relation to nuclear power plant design

    International Nuclear Information System (INIS)

    1982-01-01

    This Guide deals with the basic design requirements for nuclear power plants, and presents a general design approach for protection against the effects of man-induced events. Section 2 discusses the general design approach. Section 3 outlines the development of the basic information necessary for an evaluation of the adequacy of a design against the effects of aircraft crashes, fires, explosions, and the release of toxic gases or corrosive substances. Section 4 outlines the design logic for protection against external man-induced events. It indicates possible methods of ensuring overall plant safety, including protection against possible secondary effects. Included for each event are: a methodology for calculating the design input parameters from the data generated in the siting study, system protection considerations from the effects of this man-induced event, and criteria for judging the adequacy of the protection provided. Specific design guidance related to acts of sabotage is not provided in this Guide. It should be recognized, however, that for certain situations such acts can be important to safety and could constitute the controlling postulated initiating event for design. The list of events covered is not necessarily complete. However, important events on which enough work has already been done in various Member States to enable their effects to be converted into generally accepted design parameters are included. In addition, other man-induced events such as dam ruptures, ship collisions, construction accidents and the like are identified but no general guidelines for design can be specified for these at present. These events need to be considered on an ad hoc basis, in order to arrive at design input parameters for them

  3. Radiodosimetry and preventive measures in the event of a nuclear accident. Proceedings of an international symposium

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-08-01

    An international symposium on Radiodosimetry and Preventive Measures in the Event of a Nuclear Accident was held in Cracow, Poland, from 26 to 28 May 1994. The symposium was organized by the Polish Society for Nuclear Medicine, and co-sponsored by the IAEA. Over 40 experts from Belarus, Latvia, Lithuania, Germany, Poland, the Russian Federation, Sweden and Switzerland participated. The aim of the Symposium was to review models of iodine kinetics used in the calculation of internal radiation doses to the thyroid after the Chernobyl accident, to discuss internal and external radiation dose to the thyroid in terms or risk of thyroid cancer, and to present data on the incidence rate of thyroid cancer in the selected iodine deficient area in Poland. A part of the symposium was dedicated to the physiological basis of iodine prophylaxis and emergency planning for a nuclear accident. Recommendations of the IAEA on preventive measures in the event of a nuclear accident were also addressed. These proceedings contain the full text of the eight invited papers presented at the symposium. Refs, figs, tabs.

  4. Radiodosimetry and preventive measures in the event of a nuclear accident. Proceedings of an international symposium

    International Nuclear Information System (INIS)

    1996-08-01

    An international symposium on Radiodosimetry and Preventive Measures in the Event of a Nuclear Accident was held in Cracow, Poland, from 26 to 28 May 1994. The symposium was organized by the Polish Society for Nuclear Medicine, and co-sponsored by the IAEA. Over 40 experts from Belarus, Latvia, Lithuania, Germany, Poland, the Russian Federation, Sweden and Switzerland participated. The aim of the Symposium was to review models of iodine kinetics used in the calculation of internal radiation doses to the thyroid after the Chernobyl accident, to discuss internal and external radiation dose to the thyroid in terms or risk of thyroid cancer, and to present data on the incidence rate of thyroid cancer in the selected iodine deficient area in Poland. A part of the symposium was dedicated to the physiological basis of iodine prophylaxis and emergency planning for a nuclear accident. Recommendations of the IAEA on preventive measures in the event of a nuclear accident were also addressed. These proceedings contain the full text of the eight invited papers presented at the symposium. Refs, figs, tabs

  5. Tourism impacts of Three Mile Island and other adverse events: implications for Lincoln County and other rural counties bisected by radioactive wastes intended for Yucca Mountain

    International Nuclear Information System (INIS)

    Himmelberger, J.J.; Baughman, M.; Ogneva-Himmelberger, Y.A.

    1995-01-01

    Whether the proposed Yucca Mountain nuclear waste repository system will adversely impact tourism in southern Nevada is an open question of particular importance to visitor-oriented rural counties bisected by planned waste transportation corridors (highway or rail). As part of one such county's repository impact assessment program, tourism implications of Three Mile Island (TMI) and other major hazard events have been revisited to inform ongoing county-wide socioeconomic assessments and contingency planning efforts. This paper summarizes key research implications of such research as applied to Lincoln County, Nevada. Implications for other rural counties are discussed in light of the research findings

  6. An Improved On-line Contingency Screening for Power System Transient Stability Assessment

    DEFF Research Database (Denmark)

    Weckesser, Johannes Tilman Gabriel; Jóhannsson, Hjörtur; Glavic, Mevludin

    2017-01-01

    This paper presents a contingency screening method and a framework for its on-line implementation. The proposed method carries out contingency screening and on-line stability assessment with respect to first-swing transient stability. For that purpose, it utilizes the single machine equivalent...... method and aims at improving the prior developed contingency screening approaches. In order to determine vulnerability of the system with respect to a particular contingency, only one time-domain simulation needs to be performed. An early stop criteria is proposed so that in a majority of the cases...... the simulation can be terminated after a few hundred milliseconds of simulated system response. The method's outcome is an assessment of the system's stability and a classification of each considered contingency. The contingencies are categorized by exploiting parameters of an equivalent one machine infinite bus...

  7. Computer simulation of nuclear pollutant diffusion from Shimane nuclear power plants and development of an evacuation strategy in the event of a nuclear incident

    International Nuclear Information System (INIS)

    Yakura, Haruna; Kurimasa, Akihiro

    2012-01-01

    Beginning from Tohoku (northeastern) Earthquake on March 11, an accident at the Fukushima Dai-ichi Nuclear Power Plant resulted in a substantial release of radioactivity to the environment. The accident forced a large number of residents to evacuate from surrounding areas. Moreover, the nuclear incident was life-threatening for the elderly and for people with serious illnesses who were confined in hospital or nursing homes. Strikingly, the causes of death were not directly attributed to radiation exposure but to problems encountered during evacuation. Using nuclear diffusion data from the Fukushima incident, we simulated nuclear pollutant dispersion using computer software A2C in an area of Tottori and Shimane Prefectures surrounding the Shimane Nuclear Power Plant. We generated a model for the spread of nuclear pollutants around the Emergency Planning Zone, id est (i.e.) EPZ. From these findings, we proposed evacuation strategies for residents near the power plant to ensure a safe and reliable escape from nuclear pollutants. Our recommendations include: immediate evacuation from PAZ area (within 5 km), securing indoor shelter in the area of the UPZ (from 5 km to 30 km) and preparations to evacuate further outwards from the nuclear plant site, daytime evacuation within a 30 km area after considering wind direction and velocity, and preparation of a planned evacuation strategy that identifies secure facilities for weaker people in the event of a disaster. (author)

  8. Survey of special events recorded in nuclear power plants of the Federal Republic of Germany in the first quarter of 1991

    International Nuclear Information System (INIS)

    1991-01-01

    50 special events were reported in the old Federal States, 47 of them belonged to the reporting category N (normal notification), three to the reporting category E (immediate notification). According to the international evluation scale (INES = International Nuclear Events Scale) five of those events fell under INES category 1, the rest under category 0. The Greifswald nuclear power plant reported three events of category AE-3 (lowest category) at KGR-5. There was no release of radioactivity involved in these incidents, and there were no effects on man or the environment reported. (HP) [de

  9. Root cause analysis for fire events at nuclear power plants

    International Nuclear Information System (INIS)

    1999-09-01

    Fire hazard has been identified as a major contributor to a plant' operational safety risk. The International nuclear power community (regulators, operators, designers) has been studying and developing tools for defending against this hazed. Considerable advances have been achieved during past two decades in design and regulatory requirements for fire safety, fire protection technology and related analytical techniques. The IAEA endeavours to provide assistance to Member States in improving fire safety in nuclear power plants. A task was launched by IAEA in 1993 with the purpose to develop guidelines and good practices, to promote advanced fire safety assessment techniques, to exchange state of the art information, and to provide engineering safety advisory services and training in the implementation of internationally accepted practices. This TECDOC addresses a systematic assessment of fire events using the root cause analysis methodology, which is recognized as an important element of fire safety assessment

  10. Contingency inferences driven by base rates: Valid by sampling

    Directory of Open Access Journals (Sweden)

    Florian Kutzner

    2011-04-01

    Full Text Available Fiedler et al. (2009, reviewed evidence for the utilization of a contingency inference strategy termed pseudocontingencies (PCs. In PCs, the more frequent levels (and, by implication, the less frequent levels are assumed to be associated. PCs have been obtained using a wide range of task settings and dependent measures. Yet, the readiness with which decision makers rely on PCs is poorly understood. A computer simulation explored two potential sources of subjective validity of PCs. First, PCs are shown to perform above chance level when the task is to infer the sign of moderate to strong population contingencies from a sample of observations. Second, contingency inferences based on PCs and inferences based on cell frequencies are shown to partially agree across samples. Intriguingly, this criterion and convergent validity are by-products of random sampling error, highlighting the inductive nature of contingency inferences.

  11. The contingent valuation method: a review

    International Nuclear Information System (INIS)

    Venkatachalam, L.

    2004-01-01

    The contingent valuation method (CVM) is a simple, flexible nonmarket valuation method that is widely used in cost-benefit analysis and environmental impact assessment. However, this method is subject to severe criticism. The criticism revolves mainly around two aspects, namely, the validity and the reliability of the results, and the effects of various biases and errors. The major objective of this paper is to review the recent developments on measures to address the validity and reliability issues arising out of different kinds of biases/errors and other related empirical and methodological issues concerning contingent valuation method

  12. Recovery operations in the event of a nuclear accident or radiological emergency

    International Nuclear Information System (INIS)

    1990-01-01

    Much progress has been made over the last decade in the field of emergency planning and preparedness, including the development of guidance, criteria, training programmes, regulations and comprehensive plans in the support of nuclear facilities. To provide a forum for international review and discussion of actual experiences gained and lessons learned from the different aspects of recovery techniques and operations in response to serious accidents at nuclear facilities and accidents associated with radioactive materials, the IAEA organized the International Symposium on Recovery Operations in the Event of a Nuclear Accident or Radiological Emergency. The symposium was held from 6 to 10 November 1989 in Vienna, Austria, and was attended by over 250 experts from 35 Member State and 7 international organizations. Although the prime focus was on on-site and off-site recovery from nuclear reactor accidents and on recovery from radiological accidents unrelated to nuclear power plants, development of emergency planning and preparedness resources was covered as well. From the experiences reported, lessons learned were identified. While further work remains to be done to improve concepts, plans, materials, communications and mechanisms to assemble quickly all the special resources needed in the event of an accident, there was general agreement that worldwide preparations to handle any possible future radiological emergencies had vastly improved. A special feature of the symposium programme was the inclusion of a full session on an accident involving a chemical explosion in a high level waste tank a a plutonium extraction plant in the Southern Urals in the USSR in 1957. Information was presented on the radioactive release, its dissemination and deposition, the resultant radiation situation, dose estimates, health effects follow-up, and the rehabilitation of contaminated land. This volume contains the full text of the 49 papers presented at the symposium together with a

  13. A multiprocessor system for the analysis of pictures of nuclear events

    CERN Document Server

    Bacilieri, P; Matteuzzi, P; Sini, G P; Zanotti, U

    1979-01-01

    The pictures of nuclear events obtained from the bubble chambers such as Gargamelle and BEBC at CERN and others from Serpukhov are geometrically processed at CNAF (Centro Nazionale Analysis Photogrammi) in Bologna. The analysis system includes an Erasme table and a CRT flying spot digitizer. The difficulties connected with the pictures of the four stereoscopic views of the bubble chambers are overcome by the choice of a strong interactive system. (0 refs).

  14. Analyzing Contingency Contracting Purchases for Operation Iraqi Freedom (Unrestricted Version)

    National Research Council Canada - National Science Library

    Baldwin, Laura H; Ausink, John A; Campbell, Nancy F; Drew, John G; Roll, Jr, Charles R

    2008-01-01

    ...) in an effort to determine the size and extent of contractor support, and how plans for and the organization and execution of contingency contracting activities might be improved so that Contingency...

  15. Contingency Analysis Post-Processing With Advanced Computing and Visualization

    Energy Technology Data Exchange (ETDEWEB)

    Chen, Yousu; Glaesemann, Kurt; Fitzhenry, Erin

    2017-07-01

    Contingency analysis is a critical function widely used in energy management systems to assess the impact of power system component failures. Its outputs are important for power system operation for improved situational awareness, power system planning studies, and power market operations. With the increased complexity of power system modeling and simulation caused by increased energy production and demand, the penetration of renewable energy and fast deployment of smart grid devices, and the trend of operating grids closer to their capacity for better efficiency, more and more contingencies must be executed and analyzed quickly in order to ensure grid reliability and accuracy for the power market. Currently, many researchers have proposed different techniques to accelerate the computational speed of contingency analysis, but not much work has been published on how to post-process the large amount of contingency outputs quickly. This paper proposes a parallel post-processing function that can analyze contingency analysis outputs faster and display them in a web-based visualization tool to help power engineers improve their work efficiency by fast information digestion. Case studies using an ESCA-60 bus system and a WECC planning system are presented to demonstrate the functionality of the parallel post-processing technique and the web-based visualization tool.

  16. Low Level Event and Near Miss Process for Nuclear Power Plants: Best Practices

    International Nuclear Information System (INIS)

    2012-01-01

    The IAEA programme on the operational safety of nuclear power plants gives priority to the development and promotion of the proper use of IAEA safety standards through the provision of assistance to Member States in the application of safety standards, the performance of safety review missions and the conduct of training activities based on safety standards. A number of IAEA safety standards and nuclear safety publications discuss the processes that need to be put into place for the feedback and analysis of operating experience (OE) at nuclear power plants. These include: Fundamental Safety Principles (IAEA Safety Standards Series No. SF-1), Safety of Nuclear Power Plants: Commissioning and Operation (IAEA Safety Standards Series No. SSR-2/2), Application of the Management System for Facilities and Activities (IAEA Safety Standards Series No. GS-G-3.1) and A System for the Feedback of Experience from Events in Nuclear Installations (IAEA Safety Standards Series No. NS-G-2.11). Additionally, several IAEA TECDOCs cover many aspects of the establishment, conduct and continuous improvement of an OE programme at nuclear power plants, including the consideration of low level events (LLEs) and near misses (NMs). Although these IAEA safety standards and nuclear safety publications have been in existence for several years, 70 per cent of the IAEA Operational Safety Review Team (OSART) missions carried out at nuclear power plants between 2006 and 2010 identified weaknesses in the reporting and analysis process for LLEs and NMs. In fact, this has been one of the recurring issues most often identified in the area of OE during these missions. These weaknesses have been further confirmed by most of the IAEA Peer Review of the Operational Safety Performance Experience (PROSPER) missions that have been conducted to date. Finally, the IAEA International Nuclear Safety Group, in their report entitled Improving the International System for Operating Experience Feedback (INSAG-23

  17. Thévenin equivalent based static contingency assessment

    DEFF Research Database (Denmark)

    2015-01-01

    of the determined present state of the power system and determining a first representation of the network based on the determined Thevenin equivalents, determining a modified representation of the network, wherein the modified representation is a representation of the network having at least one contingency......, wherein at least one Thevenin equivalent of at least one voltage controlled node is modified due to the at least one contingency, the modified network representation being determined on the basis of the modified Thevenin equivalents, calculating voltage angles of the modified Thevenin equivalents......, and evaluating the voltage angles to determine whether the network having at least one contingency admit a steady state. Also a method of providing information on a real time static security assessment of a power system is disclosed....

  18. Computer Security at Nuclear Facilities (French Edition)

    International Nuclear Information System (INIS)

    2013-01-01

    The possibility that nuclear or other radioactive material could be used for malicious purposes cannot be ruled out in the current global situation. States have responded to this risk by engaging in a collective commitment to strengthen the protection and control of such material and to respond effectively to nuclear security events. States have agreed to strengthen existing instruments and have established new international legal instruments to enhance nuclear security worldwide. Nuclear security is fundamental in the management of nuclear technologies and in applications where nuclear or other radioactive material is used or transported. Through its Nuclear Security Programme, the IAEA supports States to establish, maintain and sustain an effective nuclear security regime. The IAEA has adopted a comprehensive approach to nuclear security. This recognizes that an effective national nuclear security regime builds on: the implementation of relevant international legal instruments; information protection; physical protection; material accounting and control; detection of and response to trafficking in such material; national response plans; and contingency measures. With its Nuclear Security Series, the IAEA aims to assist States in implementing and sustaining such a regime in a coherent and integrated manner. The IAEA Nuclear Security Series comprises Nuclear Security Fundamentals, which include objectives and essential elements of a State's nuclear security regime; Recommendations; Implementing Guides; and Technical Guidance. Each State carries the full responsibility for nuclear security, specifically: to provide for the security of nuclear and other radioactive material and associated facilities and activities; to ensure the security of such material in use, storage or in transport; to combat illicit trafficking and the inadvertent movement of such material; and to be prepared to respond to a nuclear security event. This publication is in the Technical Guidance

  19. Contingency management for patients with dual disorders in intensive outpatient treatment for addiction.

    Science.gov (United States)

    Kelly, Thomas M; Daley, Dennis C; Douaihy, Antoine B

    2014-01-01

    This quality improvement program evaluation investigated the effectiveness of contingency management for improving retention in treatment and positive outcomes among patients with dual disorders in intensive outpatient treatment for addiction. The effect of contingency management was explored among a group of 160 patients exposed to contingency management (n = 88) and not exposed to contingency management (no contingency management, n = 72) in a six-week partial hospitalization program. Patients referred to the partial hospitalization program for treatment of substance use and comorbid psychiatric disorders received diagnoses from psychiatrists and specialist clinicians according to the Diagnostic and Statistical Manual of the American Psychiatric Association. A unique application of the contingency management "fishbowl" method was used to improve the consistency of attendance at treatment sessions, which patients attended 5 days a week. Days attending treatment and drug-free days were the main outcome variables. Other outcomes of interest were depression, anxiety and psychological stress, coping ability, and intensity of drug cravings. Patients in the contingency management group attended more treatment days compared to patients in the no contingency management group; M = 16.2 days (SD = 10.0) versus M = 9.9 days (SD = 8.5), respectively; t = 4.2, df = 158, p contingency management and self-reported drug-free days. Contingency management is a valuable adjunct for increasing retention in treatment among patients with dual disorders in partial hospitalization treatment. Exposure to contingency management increases retention in treatment, which in turn contributes to increased drug-free days. Interventions for coping with psychological stress and drug cravings should be emphasized in intensive dual diagnosis group therapy.

  20. Plant specific safety inspection of German nuclear power plants taking into account the Fukushima-I (Japan) events

    International Nuclear Information System (INIS)

    2011-01-01

    The German Parliament requested (17 March 2011) a comprehensive inspection of German nuclear power plants. For this purpose independent expert commissions should perform a new risk analysis of all German NPPS and nuclear installations with respect to the lessons learned from the Fukushima (Japan) events and other extraordinary damage scenarios. The Reactor safety commission (RSK) was assigned by the German Bundesamt fuer Strahlenschutz to develop a catalogue of requirements for this safety inspection. The contribution summarizes the required inspection volume (status 30.03.2011) including the following events: natural events like earth quakes, floods, weather-based consequences and possible superposition. Additionally the following assumptions have to be considered: event independent postulated common failures or systematic faults, station blackout larger than 2 hours, long-term failure of the auxiliary cooling water supply; aggravating boundary conditions for the performance of emergency measures (non-availability of power supply), hydrogen generation and detonation hazard, restricted personnel availability, non-accessibility due to high radiation levels, impeded technical support from outside. (orig.)

  1. You have no right to make me think about this--the de-legitimation of current nuclear policies among key American elites

    Energy Technology Data Exchange (ETDEWEB)

    Davies, R.G.

    1982-11-16

    Until fairly recently, most segments of the American public, particularly our various elites, supported American nuclear policy, namely the maintenance of large and expanding nuclear stockpiles, the official foreswearing of the use of these weapons in a strategic first-strike, and the policy of threatening retaliation for Soviet nuclear attacks in war, by nuclear attacks on enemy cities and military centers. There is increasing evidence that this support is rapidly eroding; especially among key American elites. This is shown through increasingly vocal dissatisfaction with the continued growth and modernization of the nuclear stockpile; and second, in the dawning awareness of a discrepancy between our official policy of no first-strike and contingency plans to employ first-strike tactical nuclear weapons in the event of a Warsaw Pact attack upon Western Europe. Concerns have surfaced here due both to distaste at the growing size of our nuclear arsenal and the perception that we have not been altogether honest in our official stance of a no first-strike with nuclear weapons. Increasing numbers of Americans are coming to see our nuclear policy as inconsistent, senseless, and, most significantly, immoral, and therefore support a nuclear freeze.

  2. Appraisal of the Performance of Contingency Cost Provision for ...

    African Journals Online (AJOL)

    The paper appraised performance of contingency allowance in addressing projects' cost risk. To achieve this aim, impact of contingency provision in some selected building projects were evaluated. Data for the study was collected by means of checklist from 40 completed projects' files. Furthermore, 100 questionnaires on ...

  3. Contingency in the Cosmos and the Contingency of the Cosmos : Two Theological Approaches

    NARCIS (Netherlands)

    Drees, W.B.

    Contingency in reality may be epistemic, due to incomplete knowledge or the intersection of unrelated causal trajectories. In quantum physics, it appears to be ontological. More fundamental and interesting is the limit-question ‘why is there something rather than nothing,’ pointing out the

  4. Contingency bias in probability judgement may arise from ambiguity regarding additional causes.

    Science.gov (United States)

    Mitchell, Chris J; Griffiths, Oren; More, Pranjal; Lovibond, Peter F

    2013-09-01

    In laboratory contingency learning tasks, people usually give accurate estimates of the degree of contingency between a cue and an outcome. However, if they are asked to estimate the probability of the outcome in the presence of the cue, they tend to be biased by the probability of the outcome in the absence of the cue. This bias is often attributed to an automatic contingency detection mechanism, which is said to act via an excitatory associative link to activate the outcome representation at the time of testing. We conducted 3 experiments to test alternative accounts of contingency bias. Participants were exposed to the same outcome probability in the presence of the cue, but different outcome probabilities in the absence of the cue. Phrasing the test question in terms of frequency rather than probability and clarifying the test instructions reduced but did not eliminate contingency bias. However, removal of ambiguity regarding the presence of additional causes during the test phase did eliminate contingency bias. We conclude that contingency bias may be due to ambiguity in the test question, and therefore it does not require postulation of a separate associative link-based mechanism.

  5. Development of a Virtual Reality (VR) system for nuclear security training

    International Nuclear Information System (INIS)

    Yamaguchi, Yasuo; Hanai, Tasuku

    2014-01-01

    The Integrated Support Center for Nuclear nonproliferation and Nuclear Security (ISCN) under the Japan Atomic Energy Agency (JAEA) began the development of Virtual Reality (VR) training system for the purpose of teaching trainees nuclear security. ISCN set up two VR training courses by 2013. One is for teaching a nuclear security system of nuclear plants. The VR training system allows trainees to have virtual experiences visiting a nuclear plant. Through these experiences, trainees are able to learn how physical protection systems work in the plant. The course focuses on learning fundamental knowledge and is suitable for trainees having little experiences in the field of nuclear security. The other is for teaching fundamental skills corresponding to a contingency plan in a Central Alarm Station (CAS) of nuclear power plant. Computers of the VR training system deploy an intrusion scenario in a virtual space. Trainees in a group sit in front of 3-D screens and play a role play game in a virtual CAS. Through the exercise, trainees are able to learn skills necessary to the contingency case of nuclear plants. In my presentation, I will introduce the two training courses, advantages and disadvantages of the VR training system, reactions of trainees and future plans. (author)

  6. 10 CFR 73.23 - Protection of Safeguards Information-Modified Handling: Specific requirements.

    Science.gov (United States)

    2010-01-01

    ... security contingency events; and (x) Engineering and safety analyses, security-related procedures or..., byproduct, or special nuclear material. (2) Physical protection in transit. Information not classified as... events; and (vi) Engineering or safety analyses, security-related procedures or scenarios and other...

  7. A study on discrete event dynamic model for nuclear operations of main feed water pump

    International Nuclear Information System (INIS)

    Bae, J. C.; Choi, J. I.

    2000-01-01

    A major objective of the study is to propose a supervisory control algorithm based on the discrete event dynamic system (DEDS) model and apply it to the automation of nuclear operations. The study is motivated by the suitability of the DEDS model for simulation of man-made control action and the potential of the DEDS based supervisory control algorithm for enhanced licensibility, when implemented in nuclear plants, through design transparency due to strong analytic backgrounds. The DEDS model can analytically show the robust stability of the proposed supervisory controller providing design transparency for enhanced licensibility when implemented in nuclear operations

  8. Hypersensitivity to Contingent Behavior in Paranoia: A New Virtual Reality Paradigm.

    Science.gov (United States)

    Fornells-Ambrojo, Miriam; Elenbaas, Maaike; Barker, Chris; Swapp, David; Navarro, Xavier; Rovira, Aitor; Sanahuja, Josep Maria Tomàs; Slater, Mel

    2016-02-01

    Contingency in interpersonal relationships is associated with the development of secure attachment and trust, whereas paranoia arises from the overattribution of negative intentions. We used a new virtual reality paradigm to experimentally investigate the impact of contingent behavior on trust along the paranoia continuum. Sixty-one healthy participants were randomly allocated to have a social interaction with a pleasant virtual human (avatar) programmed to be highly responsive or not (high/low contingency). Perceived trustworthiness and trusting behavior were assessed alongside control variables attachment and anxiety. Higher paranoia and dismissive attachment were associated with larger interpersonal distances. Unexpectedly, extremely paranoid individuals experienced the highly contingent avatar as more trustworthy than their low contingency counterpart. Higher dismissive attachment was also associated with more subjective trust in both conditions. Extreme paranoia is associated with hypersensitivity to noncontingent behavior, which might explain experiences of mistrust when others are not highly responsive in everyday social situations.

  9. Reducing contingent self-worth: a defensive response to self-threats.

    Science.gov (United States)

    Buckingham, Justin; Lam, Tiffany A; Andrade, Fernanda C; Boring, Brandon L; Emery, Danielle

    2018-04-10

    Previous research shows that people with high self-esteem cope with threats to the self by reducing the extent to which their self-worth is contingent on the threatened domain (Buckingham, Weber, & Sypher, 2012). The present studies tested the hypothesis that this is a defensive process. In support of this hypothesis, Study 1 (N = 160), showed that self-affirmation attenuates the tendency for people with high self-esteem to reduce their contingencies of self-worth following self-threat. Furthermore, Study 2 (N = 286), showed that this tendency was more prevalent among people with defensive self-esteem than among those with secure self-esteem. The present studies imply that reducing contingent self-worth after self-threat is a defensive process. We discuss implications for theories of contingent self-worth.

  10. Effects of contingent self-esteem on depressive symptoms and suicidal behavior.

    Science.gov (United States)

    Lakey, Chad E; Hirsch, Jameson K; Nelson, Lyndsay A; Nsamenang, Sheri A

    2014-01-01

    Contingent self-esteem, or self-worth hinged upon successfully meeting standards or attaining goals, requires continual maintenance and validation. Despite the inherent instability that accompanies contingent self-esteem, relatively little is known about how it relates to markers of mental health. A sample of 371 college students completed measures of self-esteem, contingent self-esteem, suicidal behaviors, and depression. Individuals with fragile low self-esteem, described as highly contingent, reported greater depressive symptoms and suicidal behavior. Among those with secure high self-esteem, or high yet noncontingent, depression and suicide risk were markedly lower. Therapeutically promoting positive but noncontingent self-worth may reduce poor mental health outcomes.

  11. Step 1: Human System Integration (HSI) FY05 Pilot-Technology Interface Requirements for Contingency Management

    Science.gov (United States)

    2005-01-01

    This document involves definition of technology interface requirements for Contingency Management. This was performed through a review of Contingency Management-related, HSI requirements documents, standards, and recommended practices. Technology concepts in use by the Contingency Management Work Package were considered. Beginning with HSI high-level functional requirements for Contingency Management, and Contingency Management technology elements, HSI requirements for the interface to the pilot were identified. Results of the analysis describe (1) the information required by the pilot to have knowledge of system failures and associated contingency procedures, and (2) the control capability needed by the pilot to obtain system status and procedure information. Fundamentally, these requirements provide the candidate Contingency Management technology concepts with the necessary human-related elements to make them compatible with human capabilities and limitations. The results of the analysis describe how Contingency Management operations and functions should interface with the pilot to provide the necessary Contingency Management functionality to the UA-pilot system. Requirements and guidelines for Contingency Management are partitioned into four categories: (1) Health and Status and (2) Contingency Management. Each requirement is stated and is supported with a rationale and associated reference(s).

  12. Event classification related to overflow of solvent containing uranium according to the INES scale (International Nuclear and Radiological Event Scale)

    International Nuclear Information System (INIS)

    Dourado, Eneida R.G.; Assis, Juliana T. de; Lage, Ricardo F.; Lopes, Karina B.

    2013-01-01

    This paper aims to frame the event overflow organic solvent rich in uranium, from a decanter of ore beneficiation plant, caused by the fall in the supply of electricity, according to the criteria established by the International Nuclear Event Scale and radiological (INES), facilitating the understanding of the occurrence and communication with the public regarding the radiation safety aspects involved. With the fall of electricity, routine procedures in situations of installation stop were performed, however, due to operational failure, the valve on the transfer line liquor was not closed. Thus, the mixer continued being fed with liquor, that led the consequent leakage of solvent loaded with uranium. It reached the drainage system, and the box of rainwater harvesting of the plant. However, immediately after the detection of the event, corrective actions were initiated and the overflow was contained. Regulatory agencies followed the removal of the solvent and on the results of the analysis of environmental monitoring, found that the event did not provide exposure to workers or any other impact. Therefore, comparing the characteristics of the event and the guidelines proposed by the INES scale, it is concluded that the classification of the event is below scale/level 0, confirming the absence of risk to the local population, workers and the environment

  13. Contingency Cost estimation for Research reactor Decommissioning

    International Nuclear Information System (INIS)

    Jin, Hyung Gon; Hong, Yun Jeong

    2016-01-01

    There are many types of cost items in decommissioning cost estimation, however, contingencies are for unforeseen elements of cost within the defined project scope. Regulatory body wants to reasonable quantification for this issue. Many countries have adopted the breakdown of activity dependent and period-dependent costs to structure their estimates. Period-dependent costs could be broken down into defined time frames to reduce overall uncertainties. Several countries apply this notion by having different contingency factors for different phases of the project. This study is a compilation of contingency cost of research reactor and for each country. Simulation techniques using TRIM, MATLAB, and PSpice can be useful tools for designing detector channels. Thus far TRIM, MATLAB and PSpice have been used to calculate the detector current output pulse for SiC semiconductor detectors and to model the pulses that propagate through potential detector channels. This model is useful for optimizing the detector and the resolution for application to neutron monitoring in the Generation IV power reactors

  14. Contingency Cost estimation for Research reactor Decommissioning

    Energy Technology Data Exchange (ETDEWEB)

    Jin, Hyung Gon; Hong, Yun Jeong [KAERI, Daejeon (Korea, Republic of)

    2016-05-15

    There are many types of cost items in decommissioning cost estimation, however, contingencies are for unforeseen elements of cost within the defined project scope. Regulatory body wants to reasonable quantification for this issue. Many countries have adopted the breakdown of activity dependent and period-dependent costs to structure their estimates. Period-dependent costs could be broken down into defined time frames to reduce overall uncertainties. Several countries apply this notion by having different contingency factors for different phases of the project. This study is a compilation of contingency cost of research reactor and for each country. Simulation techniques using TRIM, MATLAB, and PSpice can be useful tools for designing detector channels. Thus far TRIM, MATLAB and PSpice have been used to calculate the detector current output pulse for SiC semiconductor detectors and to model the pulses that propagate through potential detector channels. This model is useful for optimizing the detector and the resolution for application to neutron monitoring in the Generation IV power reactors.

  15. Financial Management: DoD Process for Reporting Contingent Legal Liabilities

    National Research Council Canada - National Science Library

    Granetto, Paul J; Marsh, Patricia A; Peek, Marvin L; Brittingham, Scott S; Baidridge, Denise E; Egu, Charles O; Schenck, Kristy M; Adams, Carl L; Reiser, Cheri L

    2006-01-01

    ... contingent liabilities should read this report. It identifies areas where DoD and its Components have not fully complied with Federal financial accounting standards and are not consistent in computing and disclosing contingent legal liabilities...

  16. 10 CFR 72.186 - Change to physical security and safeguards contingency plans.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Change to physical security and safeguards contingency... contingency plans. (a) The licensee shall make no change that would decrease the safeguards effectiveness of... licensee safeguards contingency plan without prior approval of the Commission. A licensee desiring to make...

  17. Application of the IPEBS method to dynamic contingency analysis

    Energy Technology Data Exchange (ETDEWEB)

    Martins, A C.B. [FURNAS, Rio de Janeiro, RJ (Brazil); Pedroso, A S [Centro de Pesquisas de Energia Eletrica (CEPEL), Rio de Janeiro, RJ (Brazil)

    1994-12-31

    Dynamic contingency analysis is certainly a demanding task in the context of dynamic performance evaluation. This paper presents the results of a test for checking the contingency screening capability of the IPEBS method. A brazilian 1100-bus, 112-gen system was used in the test; the ranking of the contingencies based on critical clearing times obtained with IPEBS, was compared with the ranking derived from detailed time-domain simulation. The results of this comparison encourages us to recommended the use of the method in industry applications, in a complementary basis to the current method of time domain simulation. (author) 5 refs., 1 fig., 2 tabs.

  18. A Recent Revisit Study on the Human Error Events of Nuclear Facilities in Korea

    International Nuclear Information System (INIS)

    Lee, Y.-H.

    2016-01-01

    After Fukushima accident we have launched two new projects in Korea. One is for the development of the countermeasures for human errors in nuclear facilities, and the other is for the safety culture of nuclear power plant itself. There had happened several succeeding events that turned out to be the typical flags of the human and organizational factor issues for the safety of the other socio-technical systems as well as nuclear power plants in Korea. The second safety culture project was an ambitious development to establish an infra system utilising system dynamics, business process modeling and big-data techniques to provide effective and efficient information basis to various interest parties related to the nuclear power plants. However the project has been drastically cancelled last year without any further discussion on the original issues raised before in Korea. It may come not only from the conflicting perspectives among the different approaches to nuclear safety culture but also from the misunderstandings on the human factors for the nuclear safety.

  19. Nuclear security and radiological preparedness for the olympic games, athens 2004: lessons learned for organizing major public events.

    Science.gov (United States)

    Kamenopoulou, Vassiliki; Dimitriou, Panayiotis; Hourdakis, Constantine J; Maltezos, Antonios; Matikas, Theodore; Potiriadis, Constantinos; Camarinopoulos, Leonidas

    2006-10-01

    In light of the exceptional circumstances that arose from hosting the Olympic Games in Athens in 2004 and from recent terrorist events internationally, Greece attributes the highest priority to security issues. According to its statutory role, the Greek Atomic Energy Commission is responsible for emergency preparedness and response in case of nuclear and radiological events, and advises the Government on the measures and interventions necessary to protect the public. In this context, the Commission participated in the Nuclear, Radiological, Biological, and Chemical Threat National Emergency Plan, specially developed for the Olympic Games, and coordinated by the Olympic Games Security Division. The objective of this paper is to share the experience gained during the organization of the Olympic Games and to present the nuclear security program implemented prior to, during, and beyond the Games, in order to prevent, detect, assess, and respond to the threat of nuclear terrorism. This program adopted a multi-area coverage of nuclear security, including physical protection of nuclear and radiological facilities, prevention of smuggling of radioactive materials through borders, prevention of dispersion of these materials into the Olympic venues, enhancement of emergency preparedness and response to radiological events, upgrading of the technical infrastructure, establishment of new procedures for assessing the threat and responding to radiological incidents, and training personnel belonging to several organizations involved in the National Emergency Response Plan. Finally, the close cooperation of Greek Authorities with the International Atomic Energy Agency and the U.S. Department of Energy, under the coordination of the Greek Atomic Energy Commission, is also discussed.

  20. Zero-contingent entropy of quantum states of a Hydrogen atom

    International Nuclear Information System (INIS)

    Charvot, R.; Majernik, V.

    1996-01-01

    We calculated the zero-contingent entropy for the position of electron in H-atom as a function of its quantum numbers and compared it with the corresponding value of the Shannon entropy. The values of zero-contingent entropy of quantum states of H-atom correlate well with the corresponding values of Shannon's entropy. This points out that, besides the Shannon entropy, the zero-contingent entropy represents an appropriate, and mathematically rather simple, measure of the spreading out of the wave functions in H-atom. (authors)

  1. Neither snow nor rain: contingency planning by a clinical reference laboratory courier service for weather related emergencies.

    Science.gov (United States)

    Bankson, Daniel D; Heim, Joseph A

    2014-01-01

    To optimize transportation processes, we present herein a contingency plan that coordinates interim measures used to ensure continued and timely services when climate based events might cause an interruption of the usual specimen transportation processes. As an example, we outline the implementation and effectiveness of a contingency plan for network laboratory courier automobile transportation during times of mountain pass highway closure. Data available from an approximately 3-year period from October 10, 2010 through August 29, 2013 revealed a total of 690 complete closures in the eastbound or westbound lanes of the Interstate-90 highway in the Snoqualmie Pass area in the state of Washington. Despite the frequency of closures, the Washington State Department of Transportation was effective in limiting the duration of closures. Road closures of less than 1 hour accounted for 58.7% of the total closures. No recorded closures prevented dispatched couriers from completing a prescheduled Snoqualmie Pass route. We identified no delays as being clinically significant, despite that there were 5 instances of delays greater than 4 hours. We implemented a contingency plan of aiding courier logistics during all times of pass closure. The plan includes an easy to interpret Condition Dashboard as a status indicator and a Decision Tree that references and summarizes information. Overall, the contingency plan allows for an objective, robust, proactive decision support system that has enabled operational flexibility and has contributed to continued safe, on-time specimen transportation; clients and courier and reference laboratory staff have appreciated these features and associated outcomes. Copyright© by the American Society for Clinical Pathology (ASCP).

  2. 40 CFR 267.53 - Who must have copies of the contingency plan?

    Science.gov (United States)

    2010-07-01

    ... contingency plan? 267.53 Section 267.53 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... UNDER A STANDARDIZED PERMIT Contingency Plan and Emergency Procedures § 267.53 Who must have copies of the contingency plan? (a) You must maintain a copy of the plan with all revisions at the facility; and...

  3. Learning from nuclear regulatory self-assessment. International peer review of the CSN report on lessons learnt from the essential service water system degradation event at the Vandellos nuclear power plant

    International Nuclear Information System (INIS)

    2006-01-01

    Nuclear regulatory self-assessment together with the benchmarking of regulatory practices against those of other countries operating nuclear power plants are key elements in maintaining a high level of nuclear safety. In that light, the Spanish Consejo de Seguridad Nuclear (CSN) formally asked the OECD Nuclear Energy Agency (NEA) to establish an international peer review team to assess the CSN report on the lessons learnt as a result of the 2004 Vandellos II event involving essential service water system degradation. The International Review Team considers the CSN report prepared in follow-up to the Vandellos event to be a commendable effort in regulatory self-assessment. The report, complemented by this international peer review, should enable the CSN to take appropriate action to ensure that its regulatory supervision is in line with best international practice. (authors)

  4. A contingency table approach to nonparametric testing

    CERN Document Server

    Rayner, JCW

    2000-01-01

    Most texts on nonparametric techniques concentrate on location and linear-linear (correlation) tests, with less emphasis on dispersion effects and linear-quadratic tests. Tests for higher moment effects are virtually ignored. Using a fresh approach, A Contingency Table Approach to Nonparametric Testing unifies and extends the popular, standard tests by linking them to tests based on models for data that can be presented in contingency tables.This approach unifies popular nonparametric statistical inference and makes the traditional, most commonly performed nonparametric analyses much more comp

  5. Contingency Contractor Optimization Phase 3 Sustainment Database Design Document - Contingency Contractor Optimization Tool - Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Frazier, Christopher Rawls; Durfee, Justin David; Bandlow, Alisa; Gearhart, Jared Lee; Jones, Katherine A

    2016-05-01

    The Contingency Contractor Optimization Tool – Prototype (CCOT-P) database is used to store input and output data for the linear program model described in [1]. The database allows queries to retrieve this data and updating and inserting new input data.

  6. Initiating events frequency determination

    International Nuclear Information System (INIS)

    Simic, Z.; Mikulicic, V.; Vukovic, I.

    2004-01-01

    The paper describes work performed for the Nuclear Power Station (NPS). Work is related to the periodic initiating events frequency update for the Probabilistic Safety Assessment (PSA). Data for all relevant NPS initiating events (IE) were reviewed. The main focus was on events occurring during most recent operating history (i.e., last four years). The final IE frequencies were estimated by incorporating both NPS experience and nuclear industry experience. Each event was categorized according to NPS individual plant examination (IPE) initiating events grouping approach. For the majority of the IE groups, few, or no events have occurred at the NPS. For those IE groups with few or no NPS events, the final estimate was made by means of a Bayesian update with general nuclear industry values. Exceptions are rare loss-of-coolant-accidents (LOCA) events, where evaluation of engineering aspects is used in order to determine frequency.(author)

  7. "A Hedge against the Future": The Post-Cold War Rhetoric of Nuclear Weapons Modernization

    Science.gov (United States)

    Taylor, Bryan C.

    2010-01-01

    Rhetoric has traditionally played an important role in constituting the nuclear future, yet that role has changed significantly since the declared end of the Cold War. Viewed from the perspectives of nuclear criticism and postmodern theories of risk and security, current rhetoric of US nuclear modernization demonstrates how contingencies of voice…

  8. Organization of public authorities in France for the event of an incident or accident involving nuclear safety: Simulation of a nuclear crisis

    International Nuclear Information System (INIS)

    Cartigny, J.; Majorel, Y.

    1986-01-01

    The French nuclear safety regulations lay down the action to be taken in the event of an incident or accident involving the types of radiological hazard that could arise in a nuclear installation or during the transport of radioactive material. The organization established for this purpose is designed to ensure that the technical measures taken by the authorities responsible for nuclear safety, radiation protection, public order and public safety are fully effective. The Interministerial Nuclear Safety Committee (Comite interministeriel de la securite nucleaire), which reports to the Prime Minister, co-ordinates the measures taken by the public authorities. The public authorities and the operators together organize exercises designed to verify the whole complex of measures foreseen in the event of an incident or accident. These exercises, which have been carried out in a systematic manner in France for some years, are based on scenarios which are as realistic as possible and enable the following objectives to be achieved: (1) analysis of the crisis apparatus (ORSECRAD plans, individual intervention plans, information conventions); (2) uncovering gaps or inadequacies; (3) arrangements for interchange of information between the various participants whose responsibilities involve them in the emergency; and (4) allowance for the information requirements of the media and the population. The information drawn from these exercises enables the various procedures to be improved step by step. (author)

  9. Contingent valuation and incentives

    Science.gov (United States)

    Patricia A. Champ; Nicholas E. Flores; Thomas C. Brown; James Chivers

    2002-01-01

    We empirically investigate the effect of the payment mechanism on contingent values by asking a willingness-to-pay question with one of three different payment mechanisms: individual contribution, contribution with provision point, and referendum. We find statistical evidence of more affirmative responses in the referendum treatment relative to the individual...

  10. Using contingency management procedures to reduce at-risk drinking in heavy drinkers.

    Science.gov (United States)

    Dougherty, Donald M; Lake, Sarah L; Hill-Kapturczak, Nathalie; Liang, Yuanyuan; Karns, Tara E; Mullen, Jillian; Roache, John D

    2015-04-01

    Treatments for alcohol use disorders typically have been abstinence based, but harm reduction approaches that encourage drinkers to alter their drinking behavior to reduce the probability of alcohol-related consequences, have gained in popularity. This study used a contingency management procedure to determine its effectiveness in reducing alcohol consumption among heavy drinkers. Eighty-two nontreatment-seeking heavy drinkers (ages 21 to 54, M = 30.20) who did not meet diagnostic criteria for alcohol dependence participated in the study. The study had 3 phases: (i) an Observation phase (4 weeks) where participants drank normally; (ii) a Contingency Management phase (12 weeks) where participants were paid $50 weekly for not exceeding low levels of alcohol consumption as measured by transdermal alcohol concentrations, contingencies were removed. Transdermal alcohol monitors were used to verify meeting contingency requirements; all other analyses were conducted on self-reported alcohol use. On average 42.3% of participants met the contingency criteria and were paid an average of $222 during the Contingency Management phase, with an average $1,998 in total compensation throughout the study. Compared to the Observation phase, the percent of any self-reported drinking days significantly decreased from 59.9 to 40.0% in the Contingency Management and 32.0% in the Follow-up phases. The percent of self-reported heavy drinking days reported also significantly decreased from 42.4% in the Observation phase to 19.7% in the Contingency Management phase, which was accompanied by a significant increase in percent days of self-reported no (from 40.1 to 60.0%) and low-level drinking (from 9.9 to 15.4%). Self-reported reductions in drinking either persisted, or became more pronounced, during the Follow-up phase. Contingency management was associated with a reduction in self-reported episodes of heavy drinking among nontreatment-seeking heavy drinkers. These effects persisted even

  11. Visual perceptual learning by operant conditioning training follows rules of contingency

    Science.gov (United States)

    Kim, Dongho; Seitz, Aaron R; Watanabe, Takeo

    2015-01-01

    Visual perceptual learning (VPL) can occur as a result of a repetitive stimulus-reward pairing in the absence of any task. This suggests that rules that guide Conditioning, such as stimulus-reward contingency (e.g. that stimulus predicts the likelihood of reward), may also guide the formation of VPL. To address this question, we trained subjects with an operant conditioning task in which there were contingencies between the response to one of three orientations and the presence of reward. Results showed that VPL only occurred for positive contingencies, but not for neutral or negative contingencies. These results suggest that the formation of VPL is influenced by similar rules that guide the process of Conditioning. PMID:26028984

  12. Visual perceptual learning by operant conditioning training follows rules of contingency.

    Science.gov (United States)

    Kim, Dongho; Seitz, Aaron R; Watanabe, Takeo

    2015-01-01

    Visual perceptual learning (VPL) can occur as a result of a repetitive stimulus-reward pairing in the absence of any task. This suggests that rules that guide Conditioning, such as stimulus-reward contingency (e.g. that stimulus predicts the likelihood of reward), may also guide the formation of VPL. To address this question, we trained subjects with an operant conditioning task in which there were contingencies between the response to one of three orientations and the presence of reward. Results showed that VPL only occurred for positive contingencies, but not for neutral or negative contingencies. These results suggest that the formation of VPL is influenced by similar rules that guide the process of Conditioning.

  13. Safety of Basic nuclear facilities (INB) other than electronuclear reactors. Lessons learned from declared significant events in 2011 and 2012

    International Nuclear Information System (INIS)

    2013-01-01

    The first part of this report presents the different types of basic nuclear facilities other than electronuclear reactors. These installations can be industrial installations dedicated or not to the nuclear fuel cycle, research and support installations, be definitively stopped or being dismantled, or radioactive waste storage installations. After a comment of the main trends noticed in 2011 and 2012, the report proposes a transverse analysis of events which occurred in these installations. These events are related to various risks: dissemination of radioactive materials, exposure to ionizing radiations, criticality, fire and explosion, handling operations, loss of electric supplies or fluids, external aggression. Other events are those significant for the environment with a radiological component, or related to periodic controls and tests. The causes of these events are analysed. Specific events are presented which occurred on different sites (in the MELOX plant, in Areva sites in La Hague, Pierrelatte, in CEA sites in Cadarache and Saclay, in a fuel factory in Romans). Other topics are finally addressed: safety measures after the Fukushima accident, safety and radiation protection management systems of Areva and CEA, dismantling of nuclear installations

  14. PBNC 2014 : 19th Pacific Basin Nuclear Conference; 38th Annual Student Conference of the Canadian Nuclear Society and Canadian Nuclear Association

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2014-07-01

    The 19th Pacific Basin Nuclear Conference (PBNC), held in Vancouver, August 24 - 28, 2014, was an outstanding success in all aspects. With the theme 'Fulfilling the Promise of Nuclear Technology Around the Pacific Basin in the 21st Century', it included 46 senior-level presentations, 300 technical papers from countries around the Pacific rim and others, 53 student posters and a number of exhibits from several countries. The venue of Vancouver proved attractive to the large contingent of attendees from the Asian side of the Pacific Ocean, who constituted over a third of the 600 delegates. This years conference: showcased the advancement of nuclear technology in power generation, health science, and environmental stewardship; discussed challenges facing nuclear technology; and highlighted future developments.

  15. Evaluation of PWR's operating experience. Significant events which influenced French nuclear power program

    International Nuclear Information System (INIS)

    Dupuis, M.C.

    1986-10-01

    This report discusses developments or changes in safety policy (whether statutory or otherwise) and in plant design and operation, which, in many cases, correlate. When considering these events, it is important to bear in mind the standardization policy characterizing the French nuclear power program, and implying central decision-making, both for the safety authorities and the operating utility [fr

  16. External main-induced events in relation to nuclear power plant siting

    International Nuclear Information System (INIS)

    1981-01-01

    This safety Guide recomments procedures and provides information for use in implementing that part of the code of safety in Nuclear Power Plant Siting (IAEA Safety Series No. 50-C-S) which concerns man-induced events external to the plant, up to the evaluation of corresponding design basis parameters. Like the code, the Guide forms part of the IAEA's programme, referred to as the NUSS programme, for establishing codes of practice and safety Guides relating to land-based stationary thermal neutron power plants

  17. Contingency Contractor Optimization Phase 3 Sustainment Third-Party Software List - Contingency Contractor Optimization Tool - Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Durfee, Justin David; Frazier, Christopher Rawls; Bandlow, Alisa

    2016-05-01

    The Contingency Contractor Optimization Tool - Prototype (CCOT-P) requires several third-party software packages. These are documented below for each of the CCOT-P elements: client, web server, database server, solver, web application and polling application.

  18. Statistical calculation of complete events in medium-energy nuclear collisions

    International Nuclear Information System (INIS)

    Randrup, J.

    1984-01-01

    Several heavy-ion accelerators throughout the world are presently able to deliver beams of heavy nuclei with kinetic energies in the range from tens to hundreds of MeV per nucleon, the so-called medium or intermediate energy range. At such energies a large number of final channels are open, each consisting of many nuclear fragments. The disassembly of the collision system is expected to be a very complicated process and a detailed dynamical description is beyond their present capability. However, by virtue of the complexity of the process, statistical considerations may be useful. A statistical description of the disassembly yields the least biased expectations about the outcome of a collision process and provides a meaningful reference against which more specific dynamical models, as well as the data, can be discussed. This lecture presents the essential tools for formulating a statistical model for the nuclear disassembly process. The authors consider the quick disassembly (explosion) of a hot nuclear system, a so-called source, into multifragment final states, which complete according to their statistical weight. First some useful notation is introduced. Then the expressions for exclusive and inclusive distributions are given and the factorization of an exclusive distribution into inclusive ones is carried out. In turn, the grand canonical approximation for one-fragment inclusive distributions is introduced. Finally, it is outlined how to generate a statistical sample of complete final states. On this basis, a model for statistical simulation of complete events in medium-energy nuclear collisions has been developed

  19. Flexibility to contingency changes distinguishes habitual and goal-directed strategies in humans.

    Science.gov (United States)

    Lee, Julie J; Keramati, Mehdi

    2017-09-01

    Decision-making in the real world presents the challenge of requiring flexible yet prompt behavior, a balance that has been characterized in terms of a trade-off between a slower, prospective goal-directed model-based (MB) strategy and a fast, retrospective habitual model-free (MF) strategy. Theory predicts that flexibility to changes in both reward values and transition contingencies can determine the relative influence of the two systems in reinforcement learning, but few studies have manipulated the latter. Therefore, we developed a novel two-level contingency change task in which transition contingencies between states change every few trials; MB and MF control predict different responses following these contingency changes, allowing their relative influence to be inferred. Additionally, we manipulated the rate of contingency changes in order to determine whether contingency change volatility would play a role in shifting subjects between a MB and MF strategy. We found that human subjects employed a hybrid MB/MF strategy on the task, corroborating the parallel contribution of MB and MF systems in reinforcement learning. Further, subjects did not remain at one level of MB/MF behaviour but rather displayed a shift towards more MB behavior over the first two blocks that was not attributable to the rate of contingency changes but rather to the extent of training. We demonstrate that flexibility to contingency changes can distinguish MB and MF strategies, with human subjects utilizing a hybrid strategy that shifts towards more MB behavior over blocks, consequently corresponding to a higher payoff.

  20. Role of contingency in striatal response to incentive in adolescents with anxiety.

    Science.gov (United States)

    Benson, Brenda E; Guyer, Amanda E; Nelson, Eric E; Pine, Daniel S; Ernst, Monique

    2015-03-01

    This study examines the effect of contingency on reward function in anxiety. We define contingency as the aspect of a situation in which the outcome is determined by one's action-that is, when there is a direct link between one's action and the outcome of the action. Past findings in adolescents with anxiety or at risk for anxiety have revealed hypersensitive behavioral and neural responses to higher value rewards with correct performance. This hypersensitivity to highly valued (salient) actions suggests that the value of actions is determined not only by outcome magnitude, but also by the degree to which the outcome is contingent on correct performance. Thus, contingency and incentive value might each modulate reward responses in unique ways in anxiety. Using fMRI with a monetary reward task, striatal response to cue anticipation is compared in 18 clinically anxious and 20 healthy adolescents. This task manipulates orthogonally reward contingency and incentive value. Findings suggest that contingency modulates the neural response to incentive magnitude differently in the two groups. Specifically, during the contingent condition, right-striatal response tracks incentive value in anxious, but not healthy, adolescents. During the noncontingent condition, striatal response is bilaterally stronger to low than to high incentive in anxious adolescents, while healthy adolescents exhibit the expected opposite pattern. Both contingency and reward magnitude differentiate striatal activation in anxious versus healthy adolescents. These findings may reflect exaggerated concern about performance and/or alterations of striatal coding of reward value in anxious adolescents. Abnormalities in reward function in anxiety may have treatment implications.

  1. 5-HT modulation by acute tryptophan depletion of human instrumental contingency judgements.

    Science.gov (United States)

    Chase, Henry W; Crockett, Molly J; Msetfi, Rachel M; Murphy, Robin A; Clark, Luke; Sahakian, Barbara J; Robbins, Trevor W

    2011-02-01

    The concept of 'depressive realism', that depression leads to more accurate perception of causal control, has been influential in the field of depression research, but remains controversial. Recent work testing contingency learning has suggested that contextual processing might determine realism-like effects. Serotonin (5-hydroxytryptamine, (5-HT)), which is implicated in the pathophysiology of depression, might also influence contextual processing. Using acute tryptophan depletion (ATD), we tested the hypothesis that dysfunctional serotoninergic neurotransmission influences contingency judgements in dysphoric subjects via an effect on contextual processing. We employed a novel contingency learning task to obtain separate measures (ratings) of the causal effect of participants' responses and efficacy of the background context over an outcome. Participants, without a history of depression, completed this task on and off ATD in a double-blind, placebo-controlled, within-subjects design. As with other work on contingency learning, the effects of ATD were related to baseline mood levels. Although no overall effects of ATD were observed, the subgroup of participants with low Beck depression inventory (BDI) scores showed reduced ratings of contextual control and improved accuracy of contingency judgements under positive contingencies following ATD, compared to placebo. High BDI participants demonstrated low accuracy in contingency judgements, regardless of serotoninergic status. No effect of ATD on contingency judgements was observed in the group as a whole, but effects were observed in a subgroup of participants with low BDI scores. We discuss these data in light of the context processing hypothesis, and prior research on 5-HT and depressive realism.

  2. Flexibility to contingency changes distinguishes habitual and goal-directed strategies in humans.

    Directory of Open Access Journals (Sweden)

    Julie J Lee

    2017-09-01

    Full Text Available Decision-making in the real world presents the challenge of requiring flexible yet prompt behavior, a balance that has been characterized in terms of a trade-off between a slower, prospective goal-directed model-based (MB strategy and a fast, retrospective habitual model-free (MF strategy. Theory predicts that flexibility to changes in both reward values and transition contingencies can determine the relative influence of the two systems in reinforcement learning, but few studies have manipulated the latter. Therefore, we developed a novel two-level contingency change task in which transition contingencies between states change every few trials; MB and MF control predict different responses following these contingency changes, allowing their relative influence to be inferred. Additionally, we manipulated the rate of contingency changes in order to determine whether contingency change volatility would play a role in shifting subjects between a MB and MF strategy. We found that human subjects employed a hybrid MB/MF strategy on the task, corroborating the parallel contribution of MB and MF systems in reinforcement learning. Further, subjects did not remain at one level of MB/MF behaviour but rather displayed a shift towards more MB behavior over the first two blocks that was not attributable to the rate of contingency changes but rather to the extent of training. We demonstrate that flexibility to contingency changes can distinguish MB and MF strategies, with human subjects utilizing a hybrid strategy that shifts towards more MB behavior over blocks, consequently corresponding to a higher payoff.

  3. Computer Security Incident Response Planning at Nuclear Facilities

    International Nuclear Information System (INIS)

    2016-06-01

    The purpose of this publication is to assist Member States in developing comprehensive contingency plans for computer security incidents with the potential to impact nuclear security and/or nuclear safety. It provides an outline and recommendations for establishing a computer security incident response capability as part of a computer security programme, and considers the roles and responsibilities of the system owner, operator, competent authority, and national technical authority in responding to a computer security incident with possible nuclear security repercussions

  4. Nuclear power: Accidental releases - practical guidance for public health action

    International Nuclear Information System (INIS)

    1987-01-01

    The disaster at Chernobyl, USSR, has caused a major crisis of confidence in nuclear safety, and highlighted the need for comprehensive contingency planning for - and emergency response to - such accidents. This report gives practical guidance on how the authorities should deal with an accident in any type of nuclear installation, whether it involves accidental releases to the air or into water. It is based on principles developed in a previous WHO report published in 1984. It summarizes the range of accidents for which plans need to be made to protect the public, the measures to be taken and the levels of dose at which they should be applied. It indicates how to measure the levels of exposure and what are the most likely routes of exposure. It then outlines the problems faced by public health authorities and medical practitioners, and the administrative arrangements that will have to be made. The example used is of a standard pressurized light water reactor of the type currently used for electricity generation, but many of the features will be common to other nuclear installations as well. This report is addressed to those organizations and individuals responsible for public health in the event of a nuclear accident. It will also be of use to those medical practitioners who are not administratively responsible in an accident, but who may need to be aware of the consequences and of the action to be taken in the aftermath of an accident. Coordination is vital between the public health administration and the organizations with direct responsibilities in the event of an accident, and this report is essential reading for them all. 29 refs, 2 figs, 7 tabs

  5. Roentgenologic characteristic of 7 group contingent of dispensary registration

    International Nuclear Information System (INIS)

    Derzhavin, V.I.; Nalivajko, N.N.; Kozlova, L.N.; Petrik, R.N.

    1984-01-01

    9694 persons of 7 group contingent of dispensary registration were examined. Roentgenologic study of posttuberculous changes of 7 group contingent of dispensary registration showed that in people of 7-A subgroup prevail processes of secondary genesis (79.4%) and in people of 7-B subgroup - of primary genesis (55.8%). Consequences of secondary tuberculosis are most recurring

  6. Analisa Kemampuan Saluran Berdasarkan Metode Contingency N-1 Analysis

    OpenAIRE

    Syukriyadin,; Susanti, Rahmi

    2010-01-01

    Sistem transmisi memegang peranan yang sangatpenting dalam proses penyaluran daya. Oleh karena itupengamanan pada saluran transmisi perlu mendapatperhatian yang serius dalam perencanaannya. Analisakemampuan saluran merupakan aplikasi untuk mempelajarikestabilan sistem. Analisa kemampuan saluran dalampenelitian ini menggunakan metode contingency N-1 analysis.Contingency N-1 analysis merupakan sebuah program untukmemperhitungkan berbagi kondisi yang mungkin terjadidalam sistem dimasa yang akan ...

  7. Guide to the declaration procedure and coding system for criteria concerning significant events related to safety, radiation protection or the environment, applicable to basic nuclear installations and the transport of radioactive materials

    International Nuclear Information System (INIS)

    Lacoste, Andre-Claude

    2005-01-01

    This guide notably contains various forms associated with the declaration of significant events, and explanations to fill them in: significant event declaration form for a basic nuclear installation, significant event declaration form for radioactive material transport, significant event report for a basic nuclear installation, significant event report for radioactive material transport, declaration criteria for significant events related to the safety of non-PWR basic nuclear installations, declaration criteria for significant events related to PWR safety, significant events declared further to events resulting in group 1 unavailability and non-compliance with technical operating specifications, declaration criteria for significant events concerning radiation protection for basic nuclear installations, declaration criteria for significant events concerning environmental protection, applicable to basic nuclear installations, and declaration criteria for significant events concerning radioactive material transport

  8. Extended child and caregiver benefits of behavior-based child contingency learning games.

    Science.gov (United States)

    Dunst, Carl J; Raab, Melinda; Trivette, Carol M; Wilson, Linda L; Hamby, Deborah W; Parkey, Cindy

    2010-08-01

    Findings from 2 studies of the relationship between response-contingent child behavior and child, caregiver-child, and caregiver behavior not directly associated with child contingency learning are described. The participants were 19 children with significant developmental delays and their mothers in 1 study and 22 children with significant developmental delays and their teachers in the second study. Caregivers engaged the children in learning games characterized by behavior-based contingencies for 15 weeks. Research staff observed the children and their caregivers in everyday routines and activities and rated child and caregiver behavior while the children and caregivers were not playing the games. Results from both studies showed that the degree of response-contingent responding during the games was related to child and caregiver behavior, not the focus of the contingency learning opportunities afforded the children. Implications for practice are described.

  9. Fast and precise method of contingency ranking in modern power system

    DEFF Research Database (Denmark)

    Rather, Zakir Hussain; Chen, Zhe; Thøgersen, Paul

    2011-01-01

    Contingency Analysis is one of the most important aspect of Power System Security Analysis. This paper presents a fast and precise method of contingency ranking for effective power system security analysis. The method proposed in this research work takes due consideration of both apparent power o...... is based on realistic approach taking practical situations into account. Besides taking real situations into consideration the proposed method is fast enough to be considered for on-line security analysis.......Contingency Analysis is one of the most important aspect of Power System Security Analysis. This paper presents a fast and precise method of contingency ranking for effective power system security analysis. The method proposed in this research work takes due consideration of both apparent power...

  10. Trending of low level events and near misses to enhance safety performance in nuclear power plants

    International Nuclear Information System (INIS)

    2005-11-01

    The IAEA Safety Fundamentals publication, Safety of Nuclear Installations, Safety Series No. 110, states the need for operating organizations to establish a programme for the collection and analysis of operating experience in nuclear power plants. Such a programme ensures that operating experience is analysed, events important to safety are reviewed in depth, and lessons learned are disseminated to the staff of the organization and to relevant national and international organizations. As a result of the effort to enhance safety in operating organizations, incidents are progressively decreasing in number and significance. This means that in accordance with international reporting requirements the amount of collected data becomes less sufficient to draw meaningful statistical conclusions. This is where the collection and trend analysis of low level events and near misses can prove to be very useful. These trends can show which of the safety barriers are weak or failing more frequently. Evaluation and trending of low level events and near misses will help to prevent major incidents because latent weaknesses have been identified and corrective actions taken to prevent recurrence. This leads to improved safety and production. Low level events and near misses, which may reach several thousand per reactor operating year, need to be treated by the organizations as learning opportunities. A system for capturing these low level events and near misses truly needs to be an organization-wide system in which all levels of the organization, including contractors, participate. It is desirable that the overall operational experience feedback (OEF) process should integrate the lessons learned and the associated data from significant events with those of lower level events and near misses. To be able to effectively implement a process dealing with low level events and near misses, it is necessary that the organization have a well established OEF process for significant events

  11. 48 CFR 603.405 - Misrepresentations or violations of the Covenant Against Contingent Fees.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Misrepresentations or violations of the Covenant Against Contingent Fees. 603.405 Section 603.405 Federal Acquisition Regulations... Contingent Fees 603.405 Misrepresentations or violations of the Covenant Against Contingent Fees. (a) The...

  12. Contingency Operations of Americas Next Moon Rocket, Ares V

    Science.gov (United States)

    Jaap, John; Richardson, Lea

    2010-01-01

    America has begun the development of a new space vehicle system which will enable humans to return to the moon and reach even farther destinations. The system is called Constellation: it has 2 earth-launch vehicles, Ares I and Ares V; a crew module, Orion; and a lander, Altair with descent and ascent stages. Ares V will launch an Earth Departure Stage (EDS) and Altair into low earth orbit. Ares I will launch the Orion crew module into low earth orbit where it will rendezvous and dock with the Altair and EDS "stack". After rendezvous, the stack will contain four complete rocket systems, each capable of independent operations. Of course this multiplicity of vehicles provides a multiplicity of opportunities for off-nominal behavior and multiple mitigation options for each. Contingency operations are complicated by the issues of crew safety and the possibility of debris from the very large components impacting the ground. This paper examines contingency operations of the EDS in low earth orbit, during the boost to translunar orbit, and after the translunar boost. Contingency operations under these conditions have not been a consideration since the Apollo era and analysis of the possible contingencies and mitigations will take some time to evolve. Since the vehicle has not been designed, much less built, it is not possible to evaluate contingencies from a root-cause basis or from a probability basis; rather they are discussed at an effects level (such as the reaction control system is consuming propellant at a high rate). Mitigations for the contingencies are based on the severity of the off-nominal condition, the time of occurrence, recovery options, options for alternate missions, crew safety, evaluation of the condition (forensics) and future prevention. Some proposed mitigations reflect innovation in thinking and make use of the multiplicity of on-orbit resources including the crew; example: Orion could do a "fly around" to allow the crew to determine the condition

  13. Event classification related to overflow of solvent containing uranium according to the INES scale (International Nuclear and Radiological Event Scale); Classificacao do evento de transbordamento de solvente contendo uranio segundo a escala INES (International Nuclear and Radiological Event Scale)

    Energy Technology Data Exchange (ETDEWEB)

    Dourado, Eneida R.G.; Assis, Juliana T. de; Lage, Ricardo F., E-mail: cneida@inb.gov.br, E-mail: julianateixeira@inb.gov.br, E-mail: rlage@inb.gov.br [lndustrias Nucleares do Brasil S/A (CLISE.P/INB), Rio de Janeiro, RJ (Brazil). Coordenacao de Licenciamento Nuclear e Ambiental, Saude e Seguranca; Lopes, Karina B., E-mail: karina@inb.gov.br [lndustrias Nucleares do Brasil S/A (CPRAD/INB), Rio de Janeiro, RJ (Brazil). Coordenacao de Protecao Radiologica

    2013-11-01

    This paper aims to frame the event overflow organic solvent rich in uranium, from a decanter of ore beneficiation plant, caused by the fall in the supply of electricity, according to the criteria established by the International Nuclear Event Scale and radiological (INES), facilitating the understanding of the occurrence and communication with the public regarding the radiation safety aspects involved. With the fall of electricity, routine procedures in situations of installation stop were performed, however, due to operational failure, the valve on the transfer line liquor was not closed. Thus, the mixer continued being fed with liquor, that led the consequent leakage of solvent loaded with uranium. It reached the drainage system, and the box of rainwater harvesting of the plant. However, immediately after the detection of the event, corrective actions were initiated and the overflow was contained. Regulatory agencies followed the removal of the solvent and on the results of the analysis of environmental monitoring, found that the event did not provide exposure to workers or any other impact. Therefore, comparing the characteristics of the event and the guidelines proposed by the INES scale, it is concluded that the classification of the event is below scale/level 0, confirming the absence of risk to the local population, workers and the environment.

  14. Tourism impacts of Three Mile Island and other adverse events: Implications for Lincoln County and other rural counties bisected by radioactive wastes intended for Yucca Mountain

    Energy Technology Data Exchange (ETDEWEB)

    Himmelberger, J.J.; Ogneva-Himmelberger, Y.A. [Clark Univ., Worcester, MA (United States); Baughman, M. [Interech Services Corporation, Carson City, NV (United States)

    1995-11-01

    Whether the proposed Yucca Mountain nuclear waste repository system will adversely impact tourism in southern Nevada is an open question of particular importance to visitor-oriented rural counties bisected by planned waste transportation corridors (highway or rail). As part of one such county`s repository impact assessment program, tourism implications of Three Mile Island (TMI) and other major hazard events have been revisited to inform ongoing county-wide socioeconomic assessments and contingency planning efforts. This paper summarizes key research implications of such research as applied to Lincoln County, Nevada. Implications for other rural counties are discussed in light of the research findings. 29 refs., 3 figs., 1 tab.

  15. Contingent self-worth moderates the relationship between school stressors and psychological stress responses.

    Science.gov (United States)

    Ishizu, Kenichiro

    2017-04-01

    This study examined the moderating role of contingent self-worth on the relationships between school stressors and psychological stress responses among Japanese adolescents. A total of 371 Japanese junior high school students (184 boys and 187 girls, M age  = 12.79 years, SD = 0.71) completed the Japanese version of the Self-Worth Contingency Questionnaire and a mental health checklist at two points separated by a two-month interval. Hierarchical multiple regression analyses were then used to determine whether contingent self-worth moderated the relationship between school stressors and psychological stress responses. The results indicated that, when psychological stress responses were controlled for at Time 1, contingent self-worth did not predict the psychological stress responses at Time 2. However, a two-way interaction between contingent self-worth and stressors was found to significantly influence psychological stress responses, thus indicating that stressors had a stronger impact on psychological stress responses among those with high contingent self-worth compared to those with low contingent self-worth. Copyright © 2017 The Foundation for Professionals in Services for Adolescents. Published by Elsevier Ltd. All rights reserved.

  16. National Contingency Plan Subpart J

    Science.gov (United States)

    Subpart J of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP) directs EPA to prepare a schedule of dispersants, other chemicals, and oil spill mitigating devices and substances that may be used to remove or control oil discharges.

  17. Medical support to a disabled nuclear platform at sea

    Directory of Open Access Journals (Sweden)

    Vishal Kansal

    2016-01-01

    Full Text Available Indian Navy has recently joined the select band of countries that are operating nuclear powered platforms. Despite the fact, that the present day nuclear technology is quite advanced and safe; accidents on board can still happen. An accident on board a Nuclear Platform at sea can result in ‘Radiation Exposure and Contamination’ to the crew members; which can prove catastrophic. Management of casualties on board a Nuclear platform at sea presents a formidable challenge. The distressed platform being at sea will also bring in many other operational variables like distance from shore, geographical location, weather conditions, availability of rescue assets and trained manpower etc. Consequently, there is a necessity to have a well defined ‘Medical Contingency Plan’ to deal with any such eventuality happening at sea. The successful execution of the contingency plan will depend upon close coordination among diverse authorities like local Service Hospital, Command Medical & Operational Authorities, Naval Dockyard, Radiation Safety Organisations and the Rescue/Hospital Ship crew. The need is to have a holistic review of our existing medical set up and integrate new equipment, training methodologies, operating procedures to have a credible response capability.

  18. Collectivists' contingency and autonomy as predictors of buffet preferences among Taiwanese adolescents.

    Science.gov (United States)

    Chiou, Wen-Bin

    2006-01-01

    In a culture or society with high collectivism, contingent orientation and constrained autonomy are the prominent characteristics of adolescents' self-construal. This article examined whether Taiwanese adolescents' contingency and autonomy were associated with their prevalent preferences for buffet consumption. Findings in a panel survey indicated that contingency was positively correlated with adolescents' buffet preference, whereas autonomy was negatively correlated. Moreover, the results showed that adolescents' contingent orientation and perceived autonomy could predict their subsequent buffet preference over a half-year period. A laboratory experiment showed that adolescents who perceived lower autonomy exhibited greater preferences for buffet over the other diet consumption. In general, the results suggest that collectivist adolescents' contingency and autonomy were related to their trait-like preferences for buffet, and the state-like preferences for buffet were affected by their perceived levels of autonomy. Findings provide further insights into the impact of adolescents' self-construal on their diet consumption.

  19. Tests of the power PC theory of causal induction with negative contingencies.

    Science.gov (United States)

    Shanks, David R

    2002-01-01

    The power PC theory of causal induction (Cheng, 1997) proposes that causal estimates are based on the power p of a potential cause, where p is the contingency between the cause and effect normalized by the base rate of the effect. Previous tests of this theory have concentrated on generative causes that have positive contingencies with their associated outcomes. Here we empirically test this theory in two experiments using preventive causes that have negative contingencies for their outcomes. Contrary to the power PC theory, the results show that causal judgments vary with contingency across conditions of constant power p. This pattern is consistent, however, with several alternative accounts of causal judgment.

  20. An analysis of contingency statements in a DRO procedure: A case report.

    Science.gov (United States)

    Gerow, Stephanie; Rispoli, Mandy; Boles, Margot B; Neely, Leslie C

    2015-06-01

    To examine latency to criterion for reduction of challenging behaviour with and without stating a contingency statement immediately prior to a DRO procedure. An ABAC design in which A was baseline, B was used to evaluate the efficacy of a DRO procedure, and C was used to evaluate the efficacy of a DRO procedure with a contingency statement. The DRO with the contingency statement intervention was associated with a shorter latency to behaviour change than the DRO procedure without the contingency statement. These preliminary findings from this case study highlight the importance of examining the efficiency of behaviour change procedures. Directions for future research are provided.

  1. Contingency Teaching during Close Reading

    Science.gov (United States)

    Fisher, Douglas; Frey, Nancy

    2015-01-01

    12 teachers were interviewed and observed as they engaged students in close reading. We analyzed their responses and instruction to determine the scaffolds that were used as well as the contingency teaching plans they implemented when students were unable to understand the text.

  2. A Profile of Contingent Workers.

    Science.gov (United States)

    Polivka, Anne E.

    1996-01-01

    Based on data from the supplement to the February 1995 Current Population Survey, contingent workers were more likely to be female, black, young, enrolled in school, and employed in services and construction industries than were noncontingent workers. More than 10% were teachers. (Author)

  3. Radiological Contingency Planning for the Mars Science Laboratory Launch

    Energy Technology Data Exchange (ETDEWEB)

    Paul P. Guss

    2008-04-01

    This paper describes the contingency planning for the launch of the Mars Science Laboratory scheduled for the 21-day window beginning on September 15, 2009. National Security Technologies, LLC (NSTec), based in Las Vegas, Nevada, will support the U.S. Department of Energy (DOE) in its role for managing the overall radiological contingency planning support effort. This paper will focus on new technologies that NSTec’s Remote Sensing Laboratory (RSL) is developing to enhance the overall response capability that would be required for a highly unlikely anomaly. This paper presents recent advances in collecting and collating data transmitted from deployed teams and sensors. RSL is responsible to prepare the contingency planning for a range of areas from monitoring and assessment, sample collection and control, contaminated material release criteria, data management, reporting, recording, and even communications. The tools RSL has available to support these efforts will be reported. The data platform RSL will provide shall also be compatible with integration of assets and field data acquired with other DOE, National Space and Aeronautics and Space Administration (NASA), state, and local resources, personnel, and equipment. This paper also outlines the organizational structure for response elements in radiological contingency planning.

  4. Social Sensorimotor Contingencies

    OpenAIRE

    Bütepage, Judith

    2016-01-01

    As the field of robotics advances, more robots are employed in our everyday environment. Thus, the implementation of robots that can actively engage in physical collaboration and naturally interact with humans is of high importance. In order to achieve this goal, it is necessary to study human interaction and social cognition and how these aspects can be implemented in robotic agents. The theory of social sensorimotor contingencies hypothesises that many aspects of human-human interaction de...

  5. Mathematical aspects of assessing extreme events for the safety of nuclear plants

    Science.gov (United States)

    Potempski, Slawomir; Borysiewicz, Mieczyslaw

    2015-04-01

    In the paper the review of mathematical methodologies applied for assessing low frequencies of rare natural events like earthquakes, tsunamis, hurricanes or tornadoes, floods (in particular flash floods and surge storms), lightning, solar flares, etc., will be given in the perspective of the safety assessment of nuclear plants. The statistical methods are usually based on the extreme value theory, which deals with the analysis of extreme deviation from the median (or the mean). In this respect application of various mathematical tools can be useful, like: the extreme value theorem of Fisher-Tippett-Gnedenko leading to possible choices of general extreme value distributions, or the Pickands-Balkema-de Haan theorem for tail fitting, or the methods related to large deviation theory. In the paper the most important stochastic distributions relevant for performing rare events statistical analysis will be presented. This concerns, for example, the analysis of the data with the annual extreme values (maxima - "Annual Maxima Series" or minima), or the peak values, exceeding given thresholds at some periods of interest ("Peak Over Threshold"), or the estimation of the size of exceedance. Despite of the fact that there is a lack of sufficient statistical data directly containing rare events, in some cases it is still possible to extract useful information from existing larger data sets. As an example one can consider some data sets available from the web sites for floods, earthquakes or generally natural hazards. Some aspects of such data sets will be also presented taking into account their usefulness for the practical assessment of risk for nuclear power plants coming from extreme weather conditions.

  6. Summary and bibliography of safety-related events at boiling-water nuclear power plants as reported in 1980

    Energy Technology Data Exchange (ETDEWEB)

    McCormack, K.E.; Gallaher, R.B.

    1982-03-01

    This document presents a bibliography that contains 100-word abstracts of event reports submitted to the US Nuclear Regulatory Commission concerning operational events that occurred at boiling-water-reactor nuclear power plants in 1980. The 1547 abstracts included on microfiche in this bibliography describe incidents, failures, and design or construction deficiencies that were experienced at the facilities. These abstracts are arranged alphabetically by reactor name and then chronologically for each reactor. Full-size keyword and permuted-title indexes to facilitate location of individual abstracts are provided following the text. Tables that summarize the information contained in the bibliography are also provided. The information in the tables includes a listing of the equipment items involved in the reported events and the associated number of reports for each item. Similar information is given for the various kinds of instrumentation and systems, causes of failures, deficiencies noted, and the time of occurrence (i.e., during refueling, operation, testing, or construction).

  7. Associationism and cognition: human contingency learning at 25.

    Science.gov (United States)

    Shanks, David R

    2007-03-01

    A major topic within human learning, the field of contingency judgement, began to emerge about 25 years ago following publication of an article on depressive realism by Alloy and Abramson (1979). Subsequently, associationism has been the dominant theoretical framework for understanding contingency learning but this has been challenged in recent years by an alternative cognitive or inferential approach. This article outlines the key conceptual differences between these approaches and summarizes some of the main methods that have been employed to distinguish between them.

  8. [Making up tuberculosis risk groups from decreed contingents].

    Science.gov (United States)

    Kucherov, A L; Il'icheva, E Iu

    2001-01-01

    The paper provides materials to make up risk groups from decreed contingents by using the database developed and introduced in the Novomoskovsk district, as well as a programme for rapid determination of the risk of tuberculosis. This procedure reduces a scope of fluorographic surveys among the decreed contingents, as well as their expenditures by 60%. Moreover, it may be useful for professional choice in the employment of the decreed persons, which may promote a decrease in the incidence of tuberculosis among them.

  9. Computer Security at Nuclear Facilities. Reference Manual (Arabic Edition)

    International Nuclear Information System (INIS)

    2011-01-01

    The possibility that nuclear or other radioactive material could be used for malicious purposes cannot be ruled out in the current global situation. States have responded to this risk by engaging in a collective commitment to strengthen the protection and control of such material and to respond effectively to nuclear security events. States have agreed to strengthen existing instruments and have established new international legal instruments to enhance nuclear security worldwide. Nuclear security is fundamental in the management of nuclear technologies and in applications where nuclear or other radioactive material is used or transported. Through its Nuclear Security Programme, the IAEA supports States to establish, maintain and sustain an effective nuclear security regime. The IAEA has adopted a comprehensive approach to nuclear security. This recognizes that an effective national nuclear security regime builds on: the implementation of relevant international legal instruments; information protection; physical protection; material accounting and control; detection of and response to trafficking in such material; national response plans; and contingency measures. With its Nuclear Security Series, the IAEA aims to assist States in implementing and sustaining such a regime in a coherent and integrated manner. The IAEA Nuclear Security Series comprises Nuclear Security Fundamentals, which include objectives and essential elements of a State's nuclear security regime; Recommendations; Implementing Guides; and Technical Guidance. Each State carries the full responsibility for nuclear security, specifically: to provide for the security of nuclear and other radioactive material and associated facilities and activities; to ensure the security of such material in use, storage or in transport; to combat illicit trafficking and the inadvertent movement of such material; and to be prepared to respond to a nuclear security event. This publication is in the Technical Guidance

  10. Computer Security at Nuclear Facilities. Reference Manual (Russian Edition)

    International Nuclear Information System (INIS)

    2012-01-01

    The possibility that nuclear or other radioactive material could be used for malicious purposes cannot be ruled out in the current global situation. States have responded to this risk by engaging in a collective commitment to strengthen the protection and control of such material and to respond effectively to nuclear security events. States have agreed to strengthen existing instruments and have established new international legal instruments to enhance nuclear security worldwide. Nuclear security is fundamental in the management of nuclear technologies and in applications where nuclear or other radioactive material is used or transported. Through its Nuclear Security Programme, the IAEA supports States to establish, maintain and sustain an effective nuclear security regime. The IAEA has adopted a comprehensive approach to nuclear security. This recognizes that an effective national nuclear security regime builds on: the implementation of relevant international legal instruments; information protection; physical protection; material accounting and control; detection of and response to trafficking in such material; national response plans; and contingency measures. With its Nuclear Security Series, the IAEA aims to assist States in implementing and sustaining such a regime in a coherent and integrated manner. The IAEA Nuclear Security Series comprises Nuclear Security Fundamentals, which include objectives and essential elements of a State's nuclear security regime; Recommendations; Implementing Guides; and Technical Guidance. Each State carries the full responsibility for nuclear security, specifically: to provide for the security of nuclear and other radioactive material and associated facilities and activities; to ensure the security of such material in use, storage or in transport; to combat illicit trafficking and the inadvertent movement of such material; and to be prepared to respond to a nuclear security event. This publication is in the Technical Guidance

  11. Computer Security at Nuclear Facilities. Reference Manual (Chinese Edition)

    International Nuclear Information System (INIS)

    2012-01-01

    The possibility that nuclear or other radioactive material could be used for malicious purposes cannot be ruled out in the current global situation. States have responded to this risk by engaging in a collective commitment to strengthen the protection and control of such material and to respond effectively to nuclear security events. States have agreed to strengthen existing instruments and have established new international legal instruments to enhance nuclear security worldwide. Nuclear security is fundamental in the management of nuclear technologies and in applications where nuclear or other radioactive material is used or transported. Through its Nuclear Security Programme, the IAEA supports States to establish, maintain and sustain an effective nuclear security regime. The IAEA has adopted a comprehensive approach to nuclear security. This recognizes that an effective national nuclear security regime builds on: the implementation of relevant international legal instruments; information protection; physical protection; material accounting and control; detection of and response to trafficking in such material; national response plans; and contingency measures. With its Nuclear Security Series, the IAEA aims to assist States in implementing and sustaining such a regime in a coherent and integrated manner. The IAEA Nuclear Security Series comprises Nuclear Security Fundamentals, which include objectives and essential elements of a State's nuclear security regime; Recommendations; Implementing Guides; and Technical Guidance. Each State carries the full responsibility for nuclear security, specifically: to provide for the security of nuclear and other radioactive material and associated facilities and activities; to ensure the security of such material in use, storage or in transport; to combat illicit trafficking and the inadvertent movement of such material; and to be prepared to respond to a nuclear security event. This publication is in the Technical Guidance

  12. The effective application of contingency theory in health settings: problems and recommended solutions.

    Science.gov (United States)

    Strasser, S

    1983-01-01

    Contingency theory as a managerial perspective is conceptually elegant, but it may cause a number of unforeseen problems when applied in real work settings. Health care administrators can avoid many of these problems by using a hybrid contingency theory framework that blends the manager's own perceptions and experience with established contingency models.

  13. Breakdown concepts for contingency tables

    NARCIS (Netherlands)

    Kuhnt, S.

    2010-01-01

    Loglinear Poisson models are commonly used to analyse contingency tables. So far, robustness of parameter estimators as well as outlier detection have rarely been treated in this context. We start with finite-sample breakdown points. We yield that the breakdown point of mean value estimators

  14. Job satisfaction and contingent employment

    NARCIS (Netherlands)

    de Graaf-Zijl, M.

    2012-01-01

    This paper analyses job satisfaction as an aggregate of satisfaction with several job aspects, with special focus on the influence of contingent-employment contracts. Fixed-effect analysis is applied on a longitudinal sample of Dutch employees in four work arrangements: regular, fixed-term, on-call

  15. Contingent Commitments: Bringing Part-Time Faculty into Focus. Methodology Supplement

    Science.gov (United States)

    Center for Community College Student Engagement, 2014

    2014-01-01

    Center reporting prior to 2013 focused primarily on descriptive statistics (frequencies and means) of student and faculty behaviors. The goal of the analyses reported here and in "Contingent Commitments: Bringing Part-Time Faculty into Focus" is to understand the engagement of part-time or contingent faculty in various activities that…

  16. Baseline Response Levels Are a Nuisance in Infant Contingency Learning

    Science.gov (United States)

    Millar, W. S.; Weir, Catherine

    2015-01-01

    The impact of differences in level of baseline responding on contingency learning in the first year was examined by considering the response acquisition of infants classified into baseline response quartiles. Whereas the three lower baseline groups showed the predicted increment in responding to a contingency, the highest baseline responders did…

  17. Body Image Concerns and Contingent Self-Esteem in Male and Female College Students.

    Science.gov (United States)

    Grossbard, Joel R; Lee, Christine M; Neighbors, Clayton; Larimer, Mary E

    2009-02-01

    Body dissatisfaction in females, and to a lesser extent males, is associated with low self-esteem, depression, and eating disorders. This research examined gender as a moderator of the association between contingent self-esteem and body image concerns, including weight and muscularity. Participants included 359 (59.1% female) heavy drinking first-year U.S. undergraduate students who completed a survey assessing health-related risk behaviors. Hierarchical multiple regression was used to examine relations among gender, contingent self-esteem, and body image. Females reported higher levels of contingent self-esteem and greater concerns about their weight, although males reported a greater drive for muscularity. The relationship between contingent self-esteem and weight concerns was stronger among females, and for males, greater contingent self-esteem was associated with a greater drive for muscularity.

  18. Wind Turbine Contingency Control Through Generator De-Rating

    Science.gov (United States)

    Frost, Susan; Goebel, Kai; Balas, Mark

    2013-01-01

    Maximizing turbine up-time and reducing maintenance costs are key technology drivers for wind turbine operators. Components within wind turbines are subject to considerable stresses due to unpredictable environmental conditions resulting from rapidly changing local dynamics. In that context, systems health management has the aim to assess the state-of-health of components within a wind turbine, to estimate remaining life, and to aid in autonomous decision-making to minimize damage to the turbine. Advanced contingency control is one way to enable autonomous decision-making by providing the mechanism to enable safe and efficient turbine operation. The work reported herein explores the integration of condition monitoring of wind turbines with contingency control to balance the trade-offs between maintaining system health and energy capture. The contingency control involves de-rating the generator operating point to achieve reduced loads on the wind turbine. Results are demonstrated using a high fidelity simulator of a utility-scale wind turbine.

  19. Contingency table analysis methods and implementation using R

    CERN Document Server

    Kateri, Maria

    2014-01-01

    Combining theory and applications, this book presents models and methods for the analysis of two‐ and multi‐dimensional contingency tables. The author uses a threefold approach: fundamental models and related inferences are presented, their interpretational aspects are highlighted, and their practical usefulness is demonstrated. Throughout, practical guidance for using R is provided along with a comprehensive R-functions web-appendix.   Contingency tables arise in diverse fields, including the life, pedagogic, social and political sciences. They also play a prominent role in market research and opinion surveys. The analysis of contingency tables can provide insight into essential structures, relevant quantities and their interactions, and thus leads to improved decision-making.   Special features include:   ·         A motivating example for each topic ·         Applications and implementations in R for all models discussed ·         Emphasis on association and symmetry model...

  20. NextGen Flight Deck Surface Trajectory-Based Operations (STBO): Contingency Holds

    Science.gov (United States)

    Bakowski, Deborah Lee; Hooey, Becky Lee; Foyle, David C.; Wolter, Cynthia A.; Cheng, Lara W. S.

    2013-01-01

    The purpose of this pilot-in-the-loop taxi simulation was to investigate a NextGen Surface Trajectory-Based Operations (STBO) concept called "contingency holds." The contingency-hold concept parses a taxi route into segments, allowing an air traffic control (ATC) surface traffic management (STM) system to hold an aircraft when necessary for safety. Under nominal conditions, if the intersection or active runway crossing is clear, the hold is removed, allowing the aircraft to continue taxiing without slowing, thus improving taxi efficiency, while minimizing the excessive brake use, fuel burn, and emissions associated with stop-and-go taxi. However, when a potential traffic conflict exists, the hold remains in place as a fail-safe mechanism. In this departure operations simulation, the taxi clearance included a required time of arrival (RTA) to a specified intersection. The flight deck was equipped with speed-guidance avionics to aid the pilot in safely meeting the RTA. On two trials, the contingency hold was not released, and pilots were required to stop. On two trials the contingency hold was released 15 sec prior to the RTA, and on two trials the contingency hold was released 30 sec prior to the RTA. When the hold remained in place, all pilots complied with the hold. Results also showed that when the hold was released at 15-sec or 30-sec prior to the RTA, the 30-sec release allowed pilots to maintain nominal taxi speed, thus supporting continuous traffic flow; whereas, the 15-sec release did not. The contingency-hold concept, with at least a 30-sec release, allows pilots to improve taxiing efficiency by reducing braking, slowing, and stopping, but still maintains safety in that no pilots "busted" the clearance holds. Overall, the evidence suggests that the contingency-hold concept is a viable concept for optimizing efficiency while maintaining safety.

  1. Contingencies and metacontingencies: Toward a synthesis of behavior analysis and cultural materialism

    Science.gov (United States)

    Glenn, Sigrid S.

    1988-01-01

    A synthesis of cultural materialism and behavior analysis might increase the scientific and technological value of both fields. Conceptual and substantive relations between the two fields show important similarities, particularly with regard to the causal role of the environment in behavioral and cultural evolution. Key concepts in Marvin Harris's cultural materialist theories are outlined. A distinction is made between contingencies at the behavioral level of analysis (contingencies of reinforcement) and contingencies at the cultural level of analysis (metacontingencies). Relations between the two kinds of contingencies are explored in cultural practices from paleolithic to industrial sociocultural systems. A synthesis of these two fields may offer the opportunity to resolve serious problems currently facing modern cultures. PMID:22478011

  2. The Contingent Unknowability of Facts and its Relation with Informal, Epistemological Contexts

    Directory of Open Access Journals (Sweden)

    Stanley Kreiter Bezerra Medeiros

    2017-11-01

    Full Text Available This paper focuses on elements that are involved in a specific type of judgment, namely, those involving facts that, in virtue of contingent reasons, are out of our epistemic reach. Its goal is to propose a philosophical explanation about why we, in informal contexts, take some facts as contingently unknowable. In order to accomplish that goal, we develop a theory that defines contingently unknowable facts in a very specific way. We establish three clauses that are jointly necessary and sufficient — so we argue — for taking an arbitrary fact as contingently unknowable. In a variety of contexts, this strategy has the potential of reducing efforts in an epistemological analysis of this particular type of unknowability.

  3. Negotiating contingent knowledges in a time of epistemic doubt

    DEFF Research Database (Denmark)

    Phillips, Louise Jane

    How can/should we produce and communicate social scientific knowledge with authority under conditions of epistemic doubt? If all knowledge is contingent and if truth is a discursive effect rather than the final claim about reality - as post-foundationalism suggests - how can we formulate...... and provide support for contingent knowledge-claims? And how can the communication of social scientificknowlege be theorised and practised as the negotiation between social scientific knowledge and other forms of contingent knowledge rather than the one-way transmission of universal, value-free truth......-claims? In the paper, I outline an approach to addressing the final question. The approach is based on a combination of approaches to the production of knowledge developed in post-foundationalist sociology and philosophy of science, approaches to the communication of knowlege developed within communication studies...

  4. ACCRUAL OF LIABILITIES AND CONTINGENT ASSETS

    Directory of Open Access Journals (Sweden)

    Elena Ilie

    2011-12-01

    Full Text Available International Financial Reporting Standards together with Public Sector Accounting Standards are based on professional reasoning by appealing to principles that can lead to several solutions for a certain problem. In this respect Romanian economic mechanisms have a high level of rigidity in the implementation of accounting concepts and principles so that it is important to highlight the aspects that generate added value in the current economic climate. Even since 2005 the harmonization of Romanian accounting with the directives of International Accounting Standards, which came to support the harmonization of rules and principles concerning the development of annual financial statements of public institutions, is the most important and essential challenge for administrative environment. Assets and contingent liabilities are elements which in terms of the law cannot be included in the assets of a public institution that is why accounting of these elements must be performed using special off-balance sheet accounts. The purpose of this work emphasizes the opportunity and the recognition of economic events whose elements should be reflected in balance sheet, but also the appropriate and necessary moment of making entries over special accounts off the balance sheet in accordance with IPSAS 19.

  5. Re-assessment of road accident data-analysis policy : applying theory from involuntary, high-consequence, low-probability events like nuclear power plant meltdowns to voluntary, low-consequence, high-probability events like traffic accidents

    Science.gov (United States)

    2002-02-01

    This report examines the literature on involuntary, high-consequence, low-probability (IHL) events like nuclear power plant meltdowns to determine what can be applied to the problem of voluntary, low-consequence high-probability (VLH) events like tra...

  6. Task-Contingent Conscientiousness as a Unit of Personality at Work

    Science.gov (United States)

    Minbashian, Amirali; Wood, Robert E.; Beckmann, Nadin

    2010-01-01

    The present study examined the viability of incorporating task-contingent units into the study of personality at work, using conscientiousness as an illustrative example. We used experience-sampling data from 123 managers to show that (a) momentary conscientiousness at work is contingent on the difficulty and urgency demands of the tasks people…

  7. Analysis of the Power oscillations event in Laguna Verde Nuclear Power Plant. Preliminary Report

    International Nuclear Information System (INIS)

    Gonzalez M, V.M.; Amador G, R.; Castillo, R.; Hernandez, J.L.

    1995-01-01

    The event occurred at Unit 1 of Laguna Verde Nuclear Power Plant in January 24, 1995, is analyzed using the Ramona 3 B code. During this event, Unit 1 suffered power oscillation when operating previous to the transfer at high speed recirculating pumps. This phenomenon was timely detected by reactor operator who put the reactor in shut-down doing a manual Scram. Oscillations reached a maximum extent of 10.5% of nominal power from peak to peak with a frequency of 0.5 Hz. Preliminary evaluations show that the event did not endangered the fuel integrity. The results of simulating the reactor core with Ramona 3 B code show that this code is capable to moderate reactor oscillations. Nevertheless it will be necessary to perform a more detailed simulation of the event in order to prove that the code can predict the beginning of oscillations. It will be need an additional analysis which permit the identification of factors that influence the reactor stability in order to express recommendations and in this way avoid the recurrence of this kind of events. (Author)

  8. Safeguards Summary Event List (SSEL)

    International Nuclear Information System (INIS)

    1983-02-01

    The Safeguards Summary Event List (SSEL) provides brief summaries of several hundred safeguards-related events involving nuclear material or facilities regulated by the US Nuclear Regulatory Commission (NRC). Events are described under the categories of bomb-related, intrusion, missing and/or allegedly stolen, transportation, vandalism, arson, firearms, radiological sabotage and miscellaneous. The information contained in the event descriptions is derived primarily from official NRC reporting channels

  9. Safeguards Summary Event List (SSEL)

    International Nuclear Information System (INIS)

    1982-07-01

    The Safeguards Summary Event List (SSEL) provides brief summaries of several hundred safeguards-related events involving nuclear material or facilities regulated by the US Nuclear Regulatory Commission (NRC). Events are described under the categories of bomb-related, intrusion, missing and/or allegedly stolen, transportation, vandalism, arson, firearms, sabotage and miscellaneous. The information contained in the event descriptions is derived primarily from official NRC reporting channels

  10. How Precarious Is Contingent Work?

    DEFF Research Database (Denmark)

    Scheuer, Steen

    2015-01-01

    agree. This study focuses on a number of non-pay conditions for contingent employees, compared to permanent staff, under the assumption that these conditions are cumulatively negative. The article is based on utilizes a survey of app.4,900 employees (response rate 57%), asking questions concerning...

  11. Formulation of nuclear safety under various induced events. Part 1. Current status and challenges for risk-informed activities in nuclear safety

    International Nuclear Information System (INIS)

    Itoi, Tatsuya; Hayashi, Kentaro; Yamato, Masaaki

    2016-01-01

    The Nuclear Safety Subcommittee published in March 2013 a report on 'Seminar on the Fukushima Daiichi Nuclear Power Station accident' (hereinafter referred to as Seminar Report), and has thereafter continued discussions on the challenges that were pointed out in Seminar Report as the target of discussions. This commentary series summarizes the current situation and challenges for the ideal way of nuclear safety against a variety of causal events as one of the above challenges. This paper, as Part 1 of the above theme, firstly summarizes the current state of the challenges of regulatory bodies and business operators who are engaging risk information utilization. It secondly discusses the future risk information utilization of regulations and business operators, realization of integrated decision-making process, timeliness and promptness required in decision-making, and future efforts including incentives. (A.O.)

  12. Effects of Individual and Group Contingency Interventions on Attendance in Adolescent Part-Time Employees

    Science.gov (United States)

    Berkovits, Shira Melody; Sturmey, Peter; Alvero, Alicia M.

    2012-01-01

    This study examined the effects of individual and group monetary contingencies on the attendance of adolescent part-time employees. Attendance increased in both individual and group contingency phases; however staff questionnaire responses indicated a preference for the individual contingencies. Future research should consider staff acceptability…

  13. 78 FR 53113 - Approval and Promulgation of Implementation Plans; California; San Joaquin Valley; Contingency...

    Science.gov (United States)

    2013-08-28

    ...] Approval and Promulgation of Implementation Plans; California; San Joaquin Valley; Contingency Measures for... California to address Clean Air Act nonattainment area contingency measure requirements for the 1997 annual... Air Act Requirements for Contingency Measures III. Review of the Submitted San Joaquin Valley PM 2.5...

  14. Yak experience at Nuclear Power Plant Krsko

    International Nuclear Information System (INIS)

    Mandic, D.

    2000-01-01

    In Sept. 1998, Nuclear Power Plant Krsko started Y2K (Year 2000) Readiness Assessment Program and implementation of the Y2K-NEK Project (NEK Nuklearna Elektrana Kriko). Y2K-NEK Project and the term N EK Year 2000 Readiness Assessment Program'' applies to software, or software based system or interface, whose failure due to the Y2K problem would prevent the performance of the safety function of a structure, system, or component. This project also applies to any software, or software based system or interface, whose failure due to the Y2K problem would degrade, impair, or prevent operability of the nuclear facility. It is intended to supplement and use existing NEK procedures used for software quality control, configuration management and problem reporting. The main guideline and method definition documents for Y2K-NEK Project were: NEI/NUSMG 97-07: Nuclear Utility Year 2000 Readiness (October 1997), and NEI/NUSMG 98-07; Nuclear Utility Year 2000 Readiness Contingency Planning (Aug. 1998). This paper presents project Y2K implementation experience and post Y2K transition analysis of the plant hardware/software systems behavior compared to the expected systems behavior and expected-planned scenarios based on the results of the Y2K Readiness Assessment, implemented remediations and Y2K Contingency Planning. (author)

  15. Nuclear exports and international cooperation

    International Nuclear Information System (INIS)

    McCardle, J.J.

    1981-06-01

    Canada's nuclear export policy together with its non-proliferation and safeguards policy embrace both the country's desire to promote international cooperation in the peaceful uses of nuclear energy and its effort to minimize the risk of further proliferation of nuclear weapons. This policy reflects the belief that only if Canadian parliamentary and public opinion can be convinced that Canada's nuclear exports will not contribute to nuclear proliferation will the long-term health of the country's nuclear industry be assured. Canada requires a political commitment to non-proliferation from its nuclear partners, and looks to the IAEA to administer safeguards on nuclear material of Canadian origin to guarantee that commitment. Agreements reached with its nuclear partners are in accordance with provisions of the non-proliferation treaty and include a contingency provision for fall-back safeguards if the other state should withdraw from the NPT. Provision is made for mutual agreement on reprocessing and enrichment of nuclear material. Agreements have been reached with some twenty nuclear partners, and efforts are continuing to come to new international understanding on reprocessing, enrichment, and plutonium storage

  16. 48 CFR 2132.770 - Insurance premium payments and special contingency reserve.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Insurance premium payments... GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Contract Funding 2132.770 Insurance premium payments and special contingency reserve. Insurance premium payments and a special contingency reserve are made...

  17. Contingency management for the treatment of methamphetamine use disorders.

    Science.gov (United States)

    Roll, John M; Petry, Nancy M; Stitzer, Maxine L; Brecht, Mary L; Peirce, Jessica M; McCann, Michael J; Blaine, Jack; MacDonald, Marilyn; DiMaria, Joan; Lucero, Leroy; Kellogg, Scott

    2006-11-01

    Theory and some preliminary evidence suggest that contingency management may be an effective treatment strategy or adjunct to psychosocial treatment for methamphetamine use disorders. An experimentally rigorous investigation on the topic was provided by a large multisite trial conducted under the auspices of the Clinical Trials Network of the National Institute on Drug Abuse. The authors report data on 113 participants who were diagnosed with methamphetamine abuse or dependence. They were randomly assigned to receive 12 weeks of either treatment as usual or treatment as usual plus contingency management. Urine samples were tested for illicit drugs, and breath samples were tested for alcohol. The reinforcers for drug-negative samples were plastic chips, some of which could be exchanged for prizes. The number of plastic chips drawn increased with each week of negative samples but was reset to one after a missed or positive sample. The participants in both groups remained in treatment for equivalent times, but those receiving contingency management in addition to usual treatment submitted significantly more negative samples, and they were abstinent for a longer period of time (5 versus 3 weeks). These results suggest that contingency management has promise as a component in treatment strategies for methamphetamine use disorder.

  18. Safeguards Summary Event List (SSEL)

    International Nuclear Information System (INIS)

    1984-03-01

    The Safeguards Summary Event List (SSEL) provides brief summaries of several hundred safeguards-related events involving nuclear material or facilities regulated by the U.S. Nuclear Regulatory Commission (NRC). Events are described under the categories of bomb-related, intrusion, missing and/or allegedly stolen, transportation, tampering/vandalism, arson, firearms, radiological sabotage and miscellaneous. The information contained in the event descriptions is derived primarily from official NRC reporting channels

  19. Contingencies of self-worth and social-networking-site behavior.

    Science.gov (United States)

    Stefanone, Michael A; Lackaff, Derek; Rosen, Devan

    2011-01-01

    Social-networking sites like Facebook enable people to share a range of personal information with expansive groups of "friends." With the growing popularity of media sharing online, many questions remain regarding antecedent conditions for this behavior. Contingencies of self-worth afford a more nuanced approach to variable traits that affect self-esteem, and may help explain online behavior. A total of 311 participants completed an online survey measuring such contingencies and typical behaviors on Facebook. First, exploratory factor analyses revealed an underlying structure to the seven dimensions of self-worth. Public-based contingencies explained online photo sharing (β = 0.158, p relationship with time online (β = -0.186, p relationship with the intensity of online photo sharing (β = 0.242), although no relationship was evident for time spent managing profiles.

  20. Mortality in Zarinsk area of Altai Krai as a territory exposed to radiation as a result of nuclear tests at the Semipalatinsk test site

    OpenAIRE

    Kolyado I.; Plugin S.

    2017-01-01

    In Altai krai, there exists a regional segment of the National Radiation Epidemiological Register. The most numerous contingent are victims of nuclear tests at the Semipalatinsk testing site. The new method of calculation of cumulative total effective whole-body radiation dose in patients exposed to radiation as a result of nuclear testing at the Semipalatinsk test site allowed expanding this contingent, to a large extent - due to the inhabitants of Zarinsk area of Altai Krai. The given artic...

  1. Contingency and inevitability in science - Instruments, interfaces and the independent world

    NARCIS (Netherlands)

    Boon, Mieke; Soler, L.; Trizio, E.; Pickering, A.

    2015-01-01

    It is argued that the meaning of inevitability and contingency depends on the position someone has in the realism/constructivism debate. Furthermore, it is argued that analyzing what we mean by inevitable versus contingent knowledge adds a new dimension to the realism/constructivism debate.

  2. Nuclear Security Systems and Measures for the Detection of Nuclear and Other Radioactive Material out of Regulatory Control. Implementing Guide

    International Nuclear Information System (INIS)

    2013-01-01

    Nuclear terrorism and the illicit trafficking of nuclear and other radioactive material threaten the security of all States. There are large quantities of diverse radioactive material in existence, which are used in areas such as health, the environment, agriculture and industry. The possibility that nuclear and other radioactive material may be used for terrorist acts cannot be ruled out in the current global situation. States have responded to this risk by engaging in a collective commitment to strengthen the protection and control of such material, and to establish capabilities for detection and response to nuclear and other radioactive material out of regulatory control. Through its nuclear security programme, the IAEA supports States to establish, maintain and sustain an effective nuclear security regime. The IAEA has adopted a comprehensive approach to nuclear security. This approach recognizes that an effective national nuclear security regime builds on: the implementation of relevant international legal instruments; information protection; physical protection; material accounting and control; detection of and response to trafficking in nuclear and other radioactive material; national response plans; and contingency measures. Within its nuclear security programme, the IAEA aims to assist States in implementing and sustaining such a regime in a coherent and integrated manner. Each State carries the full responsibility for nuclear security, specifically: to provide for the security of nuclear and other radioactive material and associated facilities and activities; to ensure the security of such material in use, storage or in transport; to combat illicit trafficking; and to detect and respond to nuclear security events. This is an Implementing Guide on nuclear security systems and measures for the detection of nuclear and other radioactive material out of regulatory control. The objective of the publication is to provide guidance to Member States for the

  3. 45 CFR 264.72 - What requirements are imposed on a State if it receives contingency funds?

    Science.gov (United States)

    2010-10-01

    ... receives contingency funds? 264.72 Section 264.72 Public Welfare Regulations Relating to Public Welfare... Contingency Fund? § 264.72 What requirements are imposed on a State if it receives contingency funds? (a)(1) A State must meet a Contingency Fund MOE level of 100 percent of historic State expenditures for FY 1994...

  4. Training first responders on Radiological Dispersal Devices (RDDs) and Improvised Nuclear Devices (INDs) events

    International Nuclear Information System (INIS)

    Groves, Ken L.

    2008-01-01

    Full text: This paper will present an overview of the current training the author is presenting to First Responders (fire-fighters, emergency medical technicians, law enforcement and others) who may encounter either a Radiological Dispersal Device (RDD or Dirty Bomb) or an Improvised Nuclear Device (IND) as a part of their Emergency Response activities. The emphasis of the training is putting the radiological/nuclear material in perspective as compared with other Weapons of Mass Destruction (WMD) materials such as chemical and/or biological weapon agents. A goal of the training is to help this First Responder Community understand that under almost all conditions, they can perform their primary mission of 'putting out fires', rescuing and treating injured persons, and chasing 'bad guys' even in the presence of relatively large amount of radiological/nuclear contamination. The rare cases of high activity unshielded sources will be reviewed and explained. Current International guidance on dose 'limits' will be discussed. A discussion of the use of Time, Distance and Shielding as well as appropriate Personal Protective Clothing and how it will provide the needed protection while immediate actions take place early in an RDD/IND event, will take place. The use of appropriate radiation detection instrumentation, documented Standard Operating Procedures along with realistic training, drills and exercises are the key to a successful response to an RDD/IND event for this community of critical emergency responders. (author)

  5. Contingency Contractor Optimization Phase 3 Sustainment Platform Requirements - Contingency Contractor Optimization Tool - Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Durfee, Justin David [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Frazier, Christopher Rawls [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Bandlow, Alisa [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Gearhart, Jared Lee [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Jones, Katherine A. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2016-06-01

    Sandia National Laboratories (Sandia) is in Phase 3 Sustainment of development of a prototype tool, currently referred to as the Contingency Contractor Optimization Tool - Prototype (CCOTP), under the direction of OSD Program Support. CCOT-P is intended to help provide senior Department of Defense (DoD) leaders with comprehensive insight into the global availability, readiness and capabilities of the Total Force Mix. The CCOT-P will allow senior decision makers to quickly and accurately assess the impacts, risks and mitigating strategies for proposed changes to force/capabilities assignments, apportionments and allocations options, focusing specifically on contingency contractor planning. During Phase 2 of the program, conducted during fiscal year 2012, Sandia developed an electronic storyboard prototype of the Contingency Contractor Optimization Tool that can be used for communication with senior decision makers and other Operational Contract Support (OCS) stakeholders. Phase 3 used feedback from demonstrations of the electronic storyboard prototype to develop an engineering prototype for planners to evaluate. Sandia worked with the DoD and Joint Chiefs of Staff strategic planning community to get feedback and input to ensure that the engineering prototype was developed to closely align with future planning needs. The intended deployment environment was also a key consideration as this prototype was developed. Initial release of the engineering prototype was done on servers at Sandia in the middle of Phase 3. In 2013, the tool was installed on a production pilot server managed by the OUSD(AT&L) eBusiness Center. The purpose of this document is to specify the CCOT-P engineering prototype platform requirements as of May 2016. Sandia developed the CCOT-P engineering prototype using common technologies to minimize the likelihood of deployment issues. CCOT-P engineering prototype was architected and designed to be as independent as possible of the major deployment

  6. Counterfactuals and history: Contingency and convergence in histories of science and life.

    Science.gov (United States)

    Hesketh, Ian

    2016-08-01

    This article examines a series of recent histories of science that have attempted to consider how science may have developed in slightly altered historical realities. These works have, moreover, been influenced by debates in evolutionary science about the opposing forces of contingency and convergence in regard to Stephen Jay Gould's notion of "replaying life's tape." The article argues that while the historians under analysis seem to embrace contingency in order to present their counterfactual narratives, for the sake of historical plausibility they are forced to accept a fairly weak role for contingency in shaping the development of science. It is therefore argued that Simon Conway Morris's theory of evolutionary convergence comes closer to describing the restrained counterfactual worlds imagined by these historians of science than does contingency. Copyright © 2015 Elsevier Ltd. All rights reserved.

  7. Contingency Valuation of Croatian Arboretum Opeka

    Directory of Open Access Journals (Sweden)

    Stjepan Posavec

    2012-12-01

    Full Text Available Background and Purpose: Social aspects of forestry have always been an important factor of forest usage and management, and therefore have significant influence on its sustainability. Non-wood forest functions such as recreation, tourism, aesthetic and educational factors influence development of rural areas. Contingent valuation method has rarely been used for evaluation of protected forest areas. The aim of the article is to estimate the amount of money visitors are willing to pay for nature’s resources preservation in the arboretum Opeka in the North-West Croatia. Material and Methods: Opeka Arboretum is situated in the Vinica municipality in northern Croatia. Located in a large park surrounding a manor, Opeka arboretum, with its 65 hectares is the largest of the three arboretums existing in Croatia today. The arboretum was founded in 1860 by the Count Marko Bombelles. Contingent valuation is a survey-based economic technique for the non-market valuation of resources, such as environmental preservation or the impact of contamination. It is also the approach that can generally be used to include what is usually referred to as the passive use component of the economic value of environmental goods. Results and Conclusion: Willingness to pay for visitor’s use of the arboretum has been investigated using the survey and contingency valuation method on a sample of 53 respondents. Research results present high preference for arboretum benefits such as beauty of landscape, cultural and historical significance, recreation and health but low willingness to pay.

  8. [Contingency management in opioid substitution treatment].

    Science.gov (United States)

    Specka, M; Böning, A; Scherbaum, N

    2011-07-01

    The majority of opiate-dependent patients in substitution treatment show additional substance-related disorders. Concomitant use of heroin, alcohol, benzodiazepines or cocaine compromises treatment success. Concomitant drug use may be treated by using contingency management (CM) which is based on learning theory. In CM, abstinence from drugs, as verified by drug screenings, is reinforced directly and contingently. Reinforcers used in CM studies with substituted patients were, amongst others, vouchers and take-home privileges. Studies in the USA show a medium average effect of CM on drug consumption rates and abstinence. The effects decrease markedly after the end of the intervention. We discuss whether CM is applicable within the German substitution treatment system and how it can be combined with other interventions such as selective detoxification treatments or cognitive-behavioural programmes. © Georg Thieme Verlag KG Stuttgart · New York.

  9. Strategic cost management, contingent factors and performance in services

    Directory of Open Access Journals (Sweden)

    Odysseas Pavlatos

    2018-06-01

    Full Text Available The purpose of this paper is to investigate the relationship between contextual factors identified from contingency-based research, the extent of the use of strategic cost management (SCM techniques and business performance in services. An empirical survey was conducted on a sample of 88 services in Greece. The analysis of the survey data indicates that the use of strategic cost management techniques in services can be considered quite satisfactory. By drawing on the grounds of contingency theory, five factors were identified as potentially exhibiting an emergent relationship with strategic cost management. The five factors are; (1 Perceived environmental uncertainty, (2 Structure, (3 Organizational life cycle stage, (4 Strategy and (5 Size. The survey revealed that SCM usage is positively affected by these five contingent factors, while SCM usage, in turn, positively affects performance. A significant mediating effect of SCM usage on performance is evident.

  10. New Challenges of Contingency Theory in Management Accounting System, in Terms of Global Economic Crisis

    OpenAIRE

    Ene Dumitru

    2010-01-01

    This paper aims to answer the question: 1. The contingency theory can be a source of improvement in management accounting research ,in terms of global economic crisis?’’ 2. Can be Contingency factors a bridge between organizational theories and management accounting? Research purpose: -The contingency theory can be a source of improvement in management accounting research, in terms of global economic crises; -Contingency factors can be a bridge between organizational theories and management a...

  11. Special event planning for the emergency manager.

    Science.gov (United States)

    Gaynor, Peter T

    2009-11-01

    In the domain of emergency management and homeland security there is a lack of a formal planning process at the local level when it comes to special event planning. The unique nature of special event planning demands an understanding of the planning process for both traditional and non-traditional planning partners. This understanding will make certain that local governments apply due diligence when planning for the safety of the public. This paper offers a practical roadmap for planning at the local level. It will address those 'special events' that are beyond routine local events but not of a sufficient scale to be granted National Special Security Event status. Due to the infrequency of 'special events' in most communities, it is imperative that deliberate planning takes place. Upon conclusion, the reader will be able to construct a planning process tailored to the needs of their community, guide both traditional and non-traditional planning partners through the planning process, determine priorities, explore alternatives, plan for contingencies, conduct a confirmation brief, facilitate operations and assemble an after-action report and improvement plan.

  12. Contingent Imitation Increases Verbal Interaction in Children with Autism Spectrum Disorders

    Science.gov (United States)

    Ishizuka, Yuka; Yamamoto, Jun-ichi

    2016-01-01

    Several studies have suggested that contingent adult imitation increase nonverbal communication, such as attention and proximity to adults, in children with autism spectrum disorders. However, few studies have shown the effect of contingent imitation on verbal communication. This study examined whether children with autism were able to promote…

  13. Evaluation of a modified contingency management intervention for consistent attendance in therapeutic workplace participants.

    Science.gov (United States)

    Wong, Conrad J; Dillon, Erin M; Sylvest, Christine; Silverman, Kenneth

    2004-06-11

    In a therapeutic workplace business, drug abuse patients are hired as data entry operators and paid to perform data entry work contingent upon documented drug abstinence. Reliable attendance has been difficult to maintain despite the opportunity for operators to earn a living wage, 6 h per day, 5 days per week. A within-subject reversal design experiment evaluated a contingency management intervention that allowed for flexibility regarding when operators could arrive to work, yet maintained a contingency for reliable workplace attendance. Results from a within-subject reversal design experiment demonstrated the contingency management intervention to be effective in increasing the frequency of completed work shifts in four of five operators. Repeated measures ANOVA and Tukey's post-hoc tests of grouped data showed that the contingency management intervention significantly (P workplace participants.

  14. Resource Management and Contingencies in Aerospace Concurrent Engineering

    Science.gov (United States)

    Karpati, Gabe; Hyde, Tupper; Peabody, Hume; Garrison, Matthew

    2012-01-01

    significant concern in designing complex systems implementing new technologies is that while knowledge about the system is acquired incrementally, substantial financial commitments, even make-or-break decisions, must be made upfront, essentially in the unknown. One practice that helps in dealing with this dichotomy is the smart embedding of contingencies and margins in the design to serve as buffers against surprises. This issue presents itself in full force in the aerospace industry, where unprecedented systems are formulated and committed to as a matter of routine. As more and more aerospace mission concepts are generated by concurrent design laboratories, it is imperative that such laboratories apply well thought-out contingency and margin structures to their designs. The first part of this publication provides an overview of resource management techniques and standards used in the aerospace industry. That is followed by a thought provoking treatise on margin policies. The expose presents the actual flight telemetry data recorded by the thermal discipline during several recent NASA Goddard Space Flight Center missions. The margins actually achieved in flight are compared against pre-flight predictions, and the appropriateness and the ramifications of having designed with rigid margins to bounding stacked worst case conditions are assessed. The second half of the paper examines the particular issues associated with the application of contingencies and margins in the concurrent engineering environment. In closure, a discipline-by-discipline disclosure of the contingency and margin policies in use at the Integrated Design Center at NASA s Goddard Space Flight Center is made.

  15. Safeguards summary event list (SSEL)

    International Nuclear Information System (INIS)

    1989-07-01

    The Safeguards Summary Event List (SSEL) provides brief summaries of several hundred safeguards-related events involving nuclear material or facilities regulated by the US Nuclear Regulatory Commission (NRC). Because of public interest, also included are events reported involving byproduct material which is exempt from safeguards requirements. Events are described under the categories of bomb-related, intrusion, missing and/or allegedly stolen, transportation, tampering/vandalism, arson, firearms, radiological sabotage, nonradiological sabotage, alcohol and drugs, and miscellaneous. The information contained in the event descriptions is derived primarily from official NRC reporting channels

  16. Safeguards Summary Event List (SSEL)

    International Nuclear Information System (INIS)

    Fadden, M.; Yardumian, J.

    1993-07-01

    The Safeguards Summary Event List provides brief summaries of hundreds of safeguards-related events involving nuclear material or facilities regulated by the US Nuclear Regulatory Commission. Events are described under the categories: Bomb-related, Intrusion, Missing/Allegedly Stolen, Transportation-related, Tampering/Vandalism, Arson, Firearms-related, Radiological Sabotage, Non-radiological Sabotage, and Miscellaneous. Because of the public interest, the Miscellaneous category also includes events reported involving source material, byproduct material, and natural uranium, which are exempt from safeguards requirements. Information in the event descriptions was obtained from official NRC sources

  17. Automated track recognition and event reconstruction in nuclear emulsion

    International Nuclear Information System (INIS)

    Deines-Jones, P.; Aranas, A.; Cherry, M.L.; Dugas, J.; Kudzia, D.; Nilsen, B.S.; Sengupta, K.; Waddington, C.J.; Wefel, J.P.; Wilczynska, B.; Wilczynski, H.; Wosiek, B.

    1997-01-01

    The major advantages of nuclear emulsion for detecting charged particles are its submicron position resolution and sensitivity to minimum ionizing particles. These must be balanced, however, against the difficult manual microscope measurement by skilled observers required for the analysis. We have developed an automated system to acquire and analyze the microscope images from emulsion chambers. Each emulsion plate is analyzed independently, allowing coincidence techniques to be used in order to reject background and estimate error rates. The system has been used to analyze a sample of high-multiplicity Pb-Pb interactions (charged particle multiplicities ∝ 1100) produced by the 158 GeV/c per nucleon 208 Pb beam at CERN. Automatically measured events agree with our best manual measurements on 97% of all the tracks. We describe the image analysis and track reconstruction techniques, and discuss the measurement and reconstruction uncertainties. (orig.)

  18. Precursor analyses - The use of deterministic and PSA based methods in the event investigation process at nuclear power plants

    International Nuclear Information System (INIS)

    2004-09-01

    The efficient feedback of operating experience (OE) is a valuable source of information for improving the safety and reliability of nuclear power plants (NPPs). It is therefore essential to collect information on abnormal events from both internal and external sources. Internal operating experience is analysed to obtain a complete understanding of an event and of its safety implications. Corrective or improvement measures may then be developed, prioritized and implemented in the plant if considered appropriate. Information from external events may also be analysed in order to learn lessons from others' experience and prevent similar occurrences at our own plant. The traditional ways of investigating operational events have been predominantly qualitative. In recent years, a PSA-based method called probabilistic precursor event analysis has been developed, used and applied on a significant scale in many places for a number of plants. The method enables a quantitative estimation of the safety significance of operational events to be incorporated. The purpose of this report is to outline a synergistic process that makes more effective use of operating experience event information by combining the insights and knowledge gained from both approaches, traditional deterministic event investigation and PSA-based event analysis. The PSA-based view on operational events and PSA-based event analysis can support the process of operational event analysis at the following stages of the operational event investigation: (1) Initial screening stage. (It introduces an element of quantitative analysis into the selection process. Quantitative analysis of the safety significance of nuclear plant events can be a very useful measure when it comes to selecting internal and external operating experience information for its relevance.) (2) In-depth analysis. (PSA based event evaluation provides a quantitative measure for judging the significance of operational events, contributors to

  19. Two psychologies: Cognitive versus contingency-oriented

    NARCIS (Netherlands)

    Mey, H.R.A. De

    2003-01-01

    Cognitive psychology and contingency-based behavior analysis are contrasted to each other with respect to their philosophical and theoretical underpinnings as well as to theirpractical goals. Whereas the former focuses on intra-organismic structure and function in explaining minds, the latter

  20. Thomas Aquinas on Contingency of Nature

    Czech Academy of Sciences Publication Activity Database

    Dvořák, Petr

    2008-01-01

    Roč. 5, č. 2 (2008), s. 185-196 ISSN 1214-8407 R&D Projects: GA AV ČR(CZ) IAA900090602 Institutional research plan: CEZ:AV0Z90090514 Keywords : Thomas Aquinas * determinism * contingency Subject RIV: AA - Philosophy ; Religion

  1. Bridging the gap between event-by-event fluctuation measurements and theory predictions in relativistic nuclear collisions

    Energy Technology Data Exchange (ETDEWEB)

    Braun-Munzinger, P., E-mail: p.braun-munzinger@gsi.de [Extreme Matter Institute EMMI, GSI, Darmstadt (Germany); Physikalisches Institut, Universität Heidelberg, Heidelberg (Germany); Rustamov, A., E-mail: a.rustamov@cern.ch [Physikalisches Institut, Universität Heidelberg, Heidelberg (Germany); National Nuclear Research Center, Baku (Azerbaijan); Stachel, J., E-mail: stachel@physi.uni-heidelberg.de [Physikalisches Institut, Universität Heidelberg, Heidelberg (Germany)

    2017-04-15

    We develop methods to deal with non-dynamical contributions to event-by-event fluctuation measurements of net-particle numbers in relativistic nuclear collisions. These contributions arise from impact parameter fluctuations and from the requirement of overall net-baryon number or net-charge conservation and may mask the dynamical fluctuations of interest, such as those due to critical endpoints in the QCD phase diagram. Within a model of independent particle sources we derive formulae for net-particle fluctuations and develop a rigorous approach to take into account contributions from participant fluctuations in realistic experimental environments and at any cumulant order. Interestingly, contributions from participant fluctuations to the second and third cumulants of net-baryon distributions are found to vanish at mid-rapidity for LHC energies while higher cumulants of even order are non-zero even when the net-baryon number at mid-rapidity is zero. At lower beam energies the effect of participant fluctuations increases and induces spurious higher moments. The necessary corrections become large and need to be carefully taken into account before comparison to theory. We also provide a procedure for selecting the optimal phase–space coverage of particles for fluctuation analyses and discuss quantitatively the necessary correction due to global charge conservation.

  2. A Contingency View of Problem Solving in Schools: A Case Analysis.

    Science.gov (United States)

    Hanson, E. Mark; Brown, Michael E.

    Patterns of problem-solving activity in one middle-class urban high school are examined and a problem solving model rooted in a conceptual framework of contingency theory is presented. Contingency theory stresses that as political, economic, and social conditions in an organization's environment become problematic, the internal structures of the…

  3. Double contingency: A practical example of a risk acceptance philosophy

    International Nuclear Information System (INIS)

    Bazley, J.J.

    1995-01-01

    The double-contingency principle as defined in ANSI/ANS-8.1 specifies that open-quotes Process designs should, in general, incorporate sufficient factors of safety to require at least two unlikely, independent, and concurrent changes in process conditions before a criticality accident is possible.close quotes The following practical example has been used to familiarize plant operators and managers and train criticality safety engineers in double contingency

  4. Defense Infrastructure: Actions Needed to Enhance Oversight of Construction Projects Supporting Military Contingency Operations

    Science.gov (United States)

    2016-09-01

    supporting documentation for reviews that the U.S. Forces-Afghanistan conducted beginning in November 2011 of planned or ongoing contingency ...12 Contingency basing includes the planning , designing, constructing, operating, managing, and transitioning or closing of a non-enduring location...2016). Background Definition of “ Contingency Construction” Project Page 7 GAO-16-406 Defense Infrastructure statutory authority

  5. A contingency-based approach to the etiology of 'disorganized' attachment: the 'flickering switch' hypothesis.

    Science.gov (United States)

    Koós, O; Gergely, G

    2001-01-01

    The authors present a new approach to the etiology of disorganized attachment based on contingency detection theory. According to this view, the relevant common factor in parental maltreatment and unresolved loss that leads to disorganized attachment has to do with the type of "deviant contingency environment" that both of these conditions generate. In such environments, infants experience periods of being in control followed by periods of sudden loss of control over the caregiver's behavior. The authors hypothesize that this adversely affects the developmental unfolding of the infant's innate "contingency detection module" (Gergely & Watson, 1999), which normally involves a maturational shift around 3 months from an initial attention bias for perfectly contingent stimulation to an emerging preference for less-than-perfect social contingencies. The periodically changing controllability of abusive and dissociating "unresolved" attachment figures is hypothesized to block this process and to lead to the defensive fixation of a dysfunctional "flickering contingency switch" mechanism with two dominant and competing target positions (self-oriented vs. other-oriented). This results in the dissociative style of attention and behavioral organization characteristic of disorganized infant attachment. The authors summarize the preliminary results of an empirical study that provides support for this model in 6.5-month-old infants using a modified Still-Face situation (the Mirror Interaction Situation). The study demonstrates differential emotional and behavioral reactions to sudden loss of maternal contingency and a specific interest in exploring the perfectly contingent self-image in the mirror in infants who at 12 months become categorized as "disorganized" in the Strange Situation.

  6. Event-by-event jet quenching and higher Fourier moments of hard probes

    Energy Technology Data Exchange (ETDEWEB)

    Fries, Rainer J. [Cyclotron Institute and Department of Physics and Astronomy, Texas A and M University, College Station TX 77845 (United States); RIKEN/BNL Research Center, Brookhaven National Laboratory, Upton NY 11973 (United States); Rodriguez, Ricardo [Department of Mathematics and Physics, Ave Maria University, Ave Maria FL 34142 (United States); Cyclotron Institute, Texas A and M University, College Station TX 77845 (United States)

    2011-04-01

    We investigate the effect of event-by-event fluctuations of the fireball created in high energy nuclear collisions on hard probe observables. We show that spatial inhomogeneities lead to changes in the nuclear suppression factor of high momentum hadrons which can be absorbed in the quenching strength q-hat. This can increase the theoretical uncertainty on extracted values of q-hat by up to 50%. We also investigate effects on azimuthal asymmetries v{sub 2} and dihadron correlation functions. The latter show a promising residual signal of event-by-event quenching that might allow us to estimate the size of spatial inhomogeneities in the fireball from experimental data.

  7. When does self-esteem relate to deviant behavior? The role of contingencies of self-worth.

    Science.gov (United States)

    Ferris, D Lance; Brown, Douglas J; Lian, Huiwen; Keeping, Lisa M

    2009-09-01

    Researchers have assumed that low self-esteem predicts deviance, but empirical results have been mixed. This article draws upon recent theoretical developments regarding contingencies of self-worth to clarify the self-esteem/deviance relation. It was predicted that self-esteem level would relate to deviance only when self-esteem was not contingent on workplace performance. In this manner, contingent self-esteem is a boundary condition for self-consistency/behavioral plasticity theory predictions. Using multisource data collected from 123 employees over 6 months, the authors examined the interaction between level (high/low) and type (contingent/noncontingent) of self-esteem in predicting workplace deviance. Results support the hypothesized moderating effects of contingent self-esteem; implications for self-esteem theories are discussed.

  8. Issues and decisions for nuclear power plant management after fuel damage events

    International Nuclear Information System (INIS)

    1997-04-01

    Experience has shown that the on-site activities following an incident that results in severely damaged fuel at a nuclear power plant required extraordinary effort. Even in cases that are not extreme but in which fuel damage is greater than mentioned in the specifications for operation, the recovery will require extensive work. This publication includes information from several projects at the IAEA since 1989 that have resulted in a Technical Report, a TECDOC and a Workshop. While the initial purpose of the projects was focused on providing technical information transfer to the experts engaged in recovery work at the damaged unit of Chernobyl NPP, the results have led to a general approach to managing events in which there is substantial fuel damage. This TECDOC summarizes the work to focus on management issues that may be encountered in any such event whether small or large. 11 refs, 2 figs, 5 tabs

  9. conting : an R package for Bayesian analysis of complete and incomplete contingency tables

    OpenAIRE

    Overstall, Antony; King, Ruth

    2014-01-01

    The aim of this paper is to demonstrate the R package conting for the Bayesian analysis of complete and incomplete contingency tables using hierarchical log-linear models. This package allows a user to identify interactions between categorical factors (via complete contingency tables) and to estimate closed population sizes using capture-recapture studies (via incomplete contingency tables). The models are fitted using Markov chain Monte Carlo methods. In particular, implementations of the Me...

  10. 75 FR 43945 - Convention on Supplementary Compensation for Nuclear Damage Contingent Cost Allocation

    Science.gov (United States)

    2010-07-27

    ... of nuclear power around the world to meet the challenges of climate change, energy security, and... than power reactors having a thermal power rating of over 300 Megawatts. Also, nuclear facilities other... United States nuclear reactor operators. 934(a)(1). \\3\\ The Price-Anderson Act (``Price-Anderson'' or...

  11. Caspase-dependant activation of chymotrypsin-like proteases mediates nuclear events during Jurkat T cell apoptosis

    International Nuclear Information System (INIS)

    O'Connell, A.R.; Lee, B.W.; Stenson-Cox, C.

    2006-01-01

    Apoptosis involves a cascade of biochemical and morphological changes resulting in the systematic disintegration of the cell. Caspases are central mediators of this process. Supporting and primary roles for serine proteases as pro-apoptotic mediators have also been highlighted. Evidence for such roles comes largely from the use of pharmacological inhibitors; as a consequence information regarding their apoptotic function and biochemical properties has been limited. Here, we circumvented limitations associated with traditional serine protease inhibitors through use of a fluorescently labelled inhibitor of serine proteases (FLISP) that allowed for analysis of the specificity, regulation and positioning of apoptotic serine proteases within a classical apoptotic cascade. We demonstrate that staurosporine triggers a caspase-dependant induction of chymotrypsin-like activity in the nucleus of apoptotic Jurkat T cells. We show that serine protease activity is required for the generation of late stage nuclear events including condensation, fragmentation and DNA degradation. Furthermore, we reveal caspase-dependant activation of two chymotrypsin-like protein species that we hypothesize mediate cell death-associated nuclear events

  12. 78 FR 9743 - Event Reporting Guidelines

    Science.gov (United States)

    2013-02-11

    ... NUCLEAR REGULATORY COMMISSION [NRC-2011-0237] Event Reporting Guidelines AGENCY: Nuclear... Regulatory Commission (NRC) has issued NUREG- 1022, Revision 3, ``Event Reporting Guidelines: 10 CFR 50.72 and 50.73.'' [[Page 9744

  13. 78 FR 71448 - Regional Reliability Standard BAL-002-WECC-2-Contingency Reserve

    Science.gov (United States)

    2013-11-29

    ...; Order No. 789] Regional Reliability Standard BAL-002-WECC-2--Contingency Reserve AGENCY: Federal Energy... (Contingency Reserve). The North American Electric Reliability Corporation (NERC) and Western Electricity... Region and is meant to specify the quantity and types of [[Page 71449

  14. The Corps Engineer Battalion in Contingency Operations

    National Research Council Canada - National Science Library

    Raymer, James

    2001-01-01

    .... The central research question asks: Is the proposed echelons above division engineer battalion design a better one for active and reserve component corps engineer forces to respond in a contingency...

  15. Design Provisions for Withstanding Station Blackout at Nuclear Power Plants

    International Nuclear Information System (INIS)

    2015-08-01

    International operating experience has shown that the loss of off-site power supply concurrent with a turbine trip and unavailability of the standby alternating current power system is a credible event. Lessons learned from the past and recent station blackout events, as well as the analysis of the safety margins performed as part of the ‘stress tests’ conducted on European nuclear power plants in response to the Fukushima Daiichi accident, have identified the station blackout event as a limiting case for most nuclear power plants. The magnitude 9.0 earthquake and consequential tsunami which occurred in Fukushima, Japan, in March 2011, led to a common cause failure of on-site alternating current electrical power supply systems at the Fukushima Daiichi nuclear power plant as well as the off-site power grid. In addition, the resultant flooding caused the loss of direct current power supply, which further exacerbated an already critical situation at the plant. The loss of electrical power resulted in the meltdown of the core in three reactors on the site and severely restricted heat removal from the spent fuel pools for an extended period of time. The plant was left without essential instrumentation and controls, and this made accident management very challenging for the plant operators. The operators attempted to bring and maintain the reactors in a safe state without information on the vital plant parameters until the power supply was eventually restored after several days. Although the Fukushima Daiichi accident progressed well beyond the expected consequences of a station blackout, which is the complete loss of all alternating current power supplies, many of the lessons learned from the accident are valid. A failure of the plant power supply system such as the one that occurred at Fukushima Daiichi represents a design extension condition that requires management with predesigned contingency planning and operator training. The extended loss of all power at a

  16. Alternative Approaches to the Analysis of Multidimensional Contingency Tables

    Directory of Open Access Journals (Sweden)

    Iva Pecáková

    2011-12-01

    Full Text Available The practical analyses of interactions between categorical variables in various areas (such as public opinion research or marketing research are often only applications of chi-square tests in two-way contingency tables. However, in many situations it is impossible to use large-sample approximations to sampling distributions when theiradequacy can be in doubt. It is known, that these approximations may be very poor when the contingency table contains very small expected frequencies. However, recent work has shown that these approximations can be very poor when the contingency table contains both small and large expected frequencies. Of course, the rule of thumb of a minimum expected frequency is not met either in the case of sparse table. The article deals with alternative approaches to the data analysis in such cases. It points out other possibilities and shows that thanks to the development of computer technology exact methods previously only difficult usable are available for this purpose.

  17. Ordinal Log-Linear Models for Contingency Tables

    Directory of Open Access Journals (Sweden)

    Brzezińska Justyna

    2016-12-01

    Full Text Available A log-linear analysis is a method providing a comprehensive scheme to describe the association for categorical variables in a contingency table. The log-linear model specifies how the expected counts depend on the levels of the categorical variables for these cells and provide detailed information on the associations. The aim of this paper is to present theoretical, as well as empirical, aspects of ordinal log-linear models used for contingency tables with ordinal variables. We introduce log-linear models for ordinal variables: linear-by-linear association, row effect model, column effect model and RC Goodman’s model. Algorithm, advantages and disadvantages will be discussed in the paper. An empirical analysis will be conducted with the use of R.

  18. Hipse: an event generator for nuclear collisions at intermediate energies

    International Nuclear Information System (INIS)

    Lacroix, D.; Van Lauwe, A.; Durand, D.

    2003-11-01

    An event generator, HIPSE (Heavy-Ion Phase-Space Exploration), dedicated to the description of nuclear collisions in the intermediate energy range is presented. Based on the sudden approximation and on geometrical hypothesis, it can conveniently simulate heavy-ion interactions at all impact parameters and thus can constitute a valuable tool for the understanding of processes such as neck emission or multifragmentation in peripheral or/and central collisions. After a detailed description of the ingredients of the model, first comparisons with experimental data collected by the INDRA collaboration are shown. Special emphasis is put on the kinematical characteristics of fragments and light particles observed at all impact parameters for Xe+Sn reactions at 25 and 50 MeV/u and Ni + Ni at 82 MeV/u. (authors)

  19. Lessons in Contingent, Recursive Humility

    Science.gov (United States)

    Vagle, Mark D.

    2011-01-01

    In this article, the author argues that critical work in teacher education should begin with teacher educators turning a critical eye on their own practices. The author uses Lesko's conception of contingent, recursive growth and change to analyze a lesson he observed as part of a phenomenological study aimed at understanding more about what it is…

  20. Classification of radiation-hazardous objects by the ecological risk rate, based on the concept of the International Nuclear Event Scale (INES)

    International Nuclear Information System (INIS)

    Vetrov, V.A.

    2003-01-01

    The principal categories of the radiation-hazardous objects (RHO) (nuclear fuel cycle plants (NFC including NPP); ships with nuclear engine units and appropriate service facilities; units related with nuclear weapons (design, manufacture, storage, etc.); contaminated territories in the result nuclear accidents and nuclear facilities tests; civil enterprises using the radioactive sources) with real accident risk from radioactive substances (RS) release into environment are considered. For assessment of the ecological risk rate from RHO the International Nuclear Event Scale implemented by IAEA for NPP use is suggested. By opinion of the specialists the INES criteria could be used for radiation events assessment to other RHO that gives possibility for RHO arrangement by the potential hazard rate for environment in the case of accident. For RHO qualitative classification the main parameters assessment influencing on radioactive release risk (amount (total activity) of radioactive substances; possibility of chain reaction development; strength of technological parameters, etc.) was suggested. On the base of the INES all above-listed RHO kinds in the case of accident could be conditionally separated into three categories: 1. most radiation dangerous objects, on which could be severe and serious radiation accidents (corresponding to 4-7 INES levels); 2. RHO on which there is risk for accidents accompanying with RS release (accidents up to 4 INES level). 3. RHO without practical possibility for event (incidents - not higher 3 INES level). Introduction of suggested classification gives possibility for RHO safety control requirements rationalizing to radiation monitoring purposes for both RHO and the local systems