WorldWideScience

Sample records for nrc regulatory agenda

  1. NRC regulatory agenda

    International Nuclear Information System (INIS)

    1990-10-01

    The Regulatory Agenda is a quarterly compilation of all rules on which the NRC has recently completed action or has proposed, or is considering action and of all petitions for rulemaking that the NRC has received that are pending disposition

  2. NRC regulatory agenda

    International Nuclear Information System (INIS)

    1990-04-01

    The Regulatory Agenda is a quarterly compilation of all rules on which the NRC has recently completed action or has proposed, or is considering action and of all petitions for rulemaking that the NRC has received that are pending disposition

  3. NRC Regulatory Agenda

    International Nuclear Information System (INIS)

    1991-10-01

    The NRC Regulatory Agenda is a compilation of all rules on which the NRC has recently completed action, or has proposed action, or is considering action, and all petitions for rulemaking which have been received by the Commission and are pending disposition by the Commission. The Regulatory Agenda is updated and issued each quarter

  4. NRC regulatory agenda

    International Nuclear Information System (INIS)

    1993-04-01

    The NRC Regulatory Agenda is a compilation of all rules on which the NRC has recently completed action, or has proposed action, or is considering action, and all petitions for rulemaking which have been received by the Commission and are pending disposition by the Commission. The Regulatory Agenda is updated and issued each quarter

  5. NRC regulatory agenda

    International Nuclear Information System (INIS)

    1990-01-01

    The NRC Regulatory Agenda is a compilation of all rules on which the NRC has proposed or is considering action and all petitions for rulemaking which have been received by the Commission and are pending disposition by the Commission. The Regulatory Agenda is updated and issued each quarter

  6. NRC regulatory agenda

    International Nuclear Information System (INIS)

    1991-04-01

    The NRC Regulatory Agenda is a compilation of all rules on which the NRC has recently completed action or has proposed, or is considering action and all petitions for rulemaking which have been received by the Commission and are pending disposition by the Commission. The Regulatory Agenda is updated and issued each quarter

  7. NRC Regulatory Agenda

    International Nuclear Information System (INIS)

    1991-08-01

    The NRC Regulatory Agenda is a compilation of all rules on which the NRC has recently completed action or has proposed, or is considering action and all petitions for rulemaking which have been received by the commission and are pending disposition by the Commission. The Regulatory Agenda is updated and issued each quarter

  8. NRC Regulatory Agenda

    International Nuclear Information System (INIS)

    1992-07-01

    This document compilation of all rules on which the NRC has recently completed action, or has proposed action, or is considering action, and all petitions for rule making which have been received by the Commission and are pending disposition by the Commission. The Regulatory Agenda is updated and issued each quarter

  9. NRC regulatory agenda

    International Nuclear Information System (INIS)

    1993-02-01

    This document is a compilation of all rules on which the NRC has recently completed action, or has proposed action, or is considered action, and all petitions for rulemaking which have been received by the Commission and are pending disposition by the Commission. The Regulatory Agenda is updated and issued each quarter

  10. NRC Regulatory Agenda

    International Nuclear Information System (INIS)

    1989-07-01

    This document is a compilation of all rules on which the NRC has proposed or is considering action and all petitions for rulemaking which have been received by the Commission and are pending disposition by the Commission. The Regulatory Agenda is updated and issued each quarter

  11. NRC regulatory agenda

    International Nuclear Information System (INIS)

    1992-11-01

    This document provides a compilation of all rules on which the NRC has recently completed action, or has proposed action, or is considering action, and all petitions for rulemaking which have been received by the Commission and are pending disposition by the Commission. The Regulatory Agenda is updated and issued each quarter

  12. NRC regulatory agenda

    International Nuclear Information System (INIS)

    1993-07-01

    The NRC Regulatory Agenda is a compilation of all rules on which the NRC has recently completed action, or has proposed action, or is considering action, and all petitions for rulemaking which have been received by the Commission and are pending disposition by the Commission. The Regulatory Agenda is updated and issued each quarter. The rules on which final action has been taken since March 31, 1993 are: Repeal of NRC standards of conduct; Fitness-for-duty requirements for licensees who possess, use, or transport Category I material; Training and qualification of nuclear power plant personnel; Monitoring the effectiveness of maintenance at nuclear power plants; Licensing requirements for land disposal of radioactive wastes; and Licensees' announcements of safeguards inspections

  13. NRC Regulatory Agenda: Quarterly report, October--December 1988

    International Nuclear Information System (INIS)

    1989-01-01

    The NRC Regulatory Agenda is a compilation of all rules which the NRC has proposed or is considering action on, and all petitions for rulemaking which have been received by the Commission and are pending disposition by the Commission

  14. NRC Regulatory Agenda: Quarterly report, July-September 1987

    International Nuclear Information System (INIS)

    1987-11-01

    The NRC Regulatory agenda is a compilation of all rules on which the NRC has proposed or is considering action and all petitions for rulemaking which have been received by the commission and are pending disposition by the commission. The regulatory agenda is updated and issued each quarter

  15. NRC regulatory agenda: Quarterly report, April--June 1988

    International Nuclear Information System (INIS)

    1988-08-01

    The NRC Regulatory Agenda is a compilation of all rules on which the NRC has proposed or is considering action and all petitions for rulemaking which have been received by the Commission and are pending disposition by the Commission. The Regulatory Agenda is updated and issued each quarter

  16. NRC regulatory agenda. Seminnual progress report, January 1996--June 1996

    International Nuclear Information System (INIS)

    1996-08-01

    The NRC Regulatory Agenda is a compilation of all rules on which the NRC has recently completed action, or has proposed action, or is considering action, and all petitions for rule making which have been received by the Commission and are pending disposition by the Commission. The regulatory Agenda is updated and issued semiannually

  17. NRC Regulatory Agenda quarterly report, July--September 1993

    International Nuclear Information System (INIS)

    1993-10-01

    The NRC Regulator Agenda is a compilation of all rules on which the NRC has recently completed action, or has proposed action, or is considering action, and all petitions for rulemaking which have been received by the commission and are pending disposition by the Commission. The Regulatory Agenda is updated and issued each quarter

  18. NRC Regulatory Agenda. Quarterly report, July-September 1982

    International Nuclear Information System (INIS)

    1982-10-01

    The Regulatory Agenda is a quarterly compilation of all rules on which the NRC has proposed or is considering action and all petitions for rulemaking which have been received and are pending disposition by the Commission. The agenda consists of two sections. Section I, Rules, includes: (1) rules on which final action has been taken since June 30, the cutoff date of the last Regulatory Agenda; (2) rules published previously as proposed rules and on which the Commission has not taken final action; (3) rules published as advance notices of proposed rulemaking and for which neither a proposed nor final rule has been issued; and (4) unpublished rules on which the NRC expects to take action. Section II, Petitions for Rulemaking, includes: (1) Petitions incorporated into final rules or petitions denied since the cutoff date of the last Regulatory Agenda; (2) Petitions incorporated into proposed rules, (3) Petitions pending staff review; and (4) Petitions with deferred action

  19. NRC Regulatory Agenda. Quarterly report, July-September 1985

    International Nuclear Information System (INIS)

    1985-10-01

    The Regulatory Agenda is a quarterly compilation of all rules on which the NRC has proposed, or is considering action as well as those on which it has recently completed action, and all petitions for rulemaking which have been received and are pending disposition by the Commission

  20. NRC Regulatory Agenda: Quarterly report, January--March 1988

    International Nuclear Information System (INIS)

    1988-07-01

    The Regulatory Agenda is a quarterly compilation of all rules on which the NRC has proposed, or is considering action as well as those on which it has recently completed action, and all petitions for rulemaking which have been received and are pending disposition by the Commission

  1. NRC Regulatory Agenda semiannual report, July--December 1995. Volume 14, No. 2

    International Nuclear Information System (INIS)

    1996-02-01

    The NRC Regulatory Agenda is a compilation of all rules on which the NRC has recently completed action, or has proposed action, or is considering action, and all petitions for rulemaking which have been received by the Commission and are pending disposition by the Commission. The Regulatory Agenda is updated and issued semianually

  2. NRC regulatory agenda: Semiannual report, July--December 1996. Volume 15, Number 2

    International Nuclear Information System (INIS)

    1997-03-01

    The NRC Regulatory Agenda is a compilation of all rules on which the NRC has recently completed action, or has proposed action, or is considering action, and all petitions for rulemaking which have been received by the Commission and are pending disposition by the Commission. The Regulatory Agenda is updated and issued semiannually

  3. NRC regulatory agenda: Quarterly report, April-June 1987

    International Nuclear Information System (INIS)

    1987-07-01

    This compilation summarizes significant enforcement actions that have been resolved during one quarterly period and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication

  4. NRC regulatory agenda: Semiannual report, January--June 1997. Volume 16, Number 1

    International Nuclear Information System (INIS)

    1997-08-01

    The Regulatory Agenda is a semiannual compilation of all rules on which the NRC has recently completed action, or has proposed action, or is considering action, and of all petitions for rulemaking that the NRC has received that are pending disposition. The agenda consists of two sections that have been updated through June 30, 1997. Section 1, ''Rules,'' includes (A) rules on which final action has been taken since December 31, 1996, the closing date of the last NRC Regulatory Agenda; (B) rules published previously as proposed rules on which the Commission has not taken final action; (C) rules published as advance notices of proposed rulemaking for which neither a proposed nor final rule has been issued; and (D) unpublished rules on which the NRC expects to take action. Section 2, ''Petitions for Rulemaking,'' includes (A) petitions denied or incorporated into final rules since December 31, 1996; (B) petitions incorporated into proposed rules; and (C) petitions pending staff review

  5. NRC Regulatory Agenda. Quarterly report, October-December 1985. Volume 4, No. 4

    International Nuclear Information System (INIS)

    1986-03-01

    The Regulatory Agenda is a quarterly compilation of all rules on which the NRC has proposed, or is considering action as well as those on which it has recently completed action, and all petitions for rulemaking which have been received and are pending disposition by the Commission

  6. NRC regulatory agenda: Semiannual report, January--June 1995. Volume 14, Number 1

    International Nuclear Information System (INIS)

    1995-09-01

    The Regulatory Agenda is a semiannual compilation of all rules on which the NRC has recently completed action, or has proposed action, or is considering action, and of all petitions for rulemaking that the NRC has received that are pending disposition. The agenda consists of two sections that have been updated through June 30, 1995. Section 1, ''Rules,'' includes (A) rules on which final action has been taken since December 30, 1994, the closing date of the last NRC Regulatory Agenda; (B) rules published previously as proposed rules on which the Commission has not taken final action; (C) rules published as advance notices of proposed rulemaking for which neither a proposed nor final rule has been issued; and (D) unpublished rules on which the NRC expects to take action. Section 2, ''Petitions for Rulemaking,'' includes (A) petitions denied or incorporated into final rules since December 30, 1994; (B) petitions incorporated into proposed rules; (C) petitions pending staff review, and (D) petitions with deferred action

  7. NRC regualtory agenda. Semiannual report, July 1997--December 1997

    International Nuclear Information System (INIS)

    1998-02-01

    The Regulatory Agenda is a semiannual compilation of all rules on which the NRC has recently completed action, or has proposed action, or is considering action, and of all petitions for rulemaking that the NRC has received that are pending disposition

  8. NRC regulatory information conference: Proceedings

    International Nuclear Information System (INIS)

    1989-09-01

    This volume of the report provides the proceedings from the Nuclear Regulatory Commission (NRC) Regulatory Information Conference that was held at the Mayflower Hotel, Washington, DC, on April 18, 19, and 20, 1989. This conference was held by the NRC and chaired by Dr. Thomas E. Mosley, Director, Office of Nuclear Reactor Regulations (NRR) and coordinated by S. Singh Bajwa, Chief, Technical Assistance Management Section, NRR. There were approximately 550 participants from nine countries at the conference. The countries represented were Canada, England, Italy, Japan, Mexico, Spain, Taiwan, Yugoslavia, and the United States. The NRC staff discussed with nuclear industry its regulatory philosophy and approach and the bases on which they have been established. Furthermore, the NRC staff discussed several initiatives that have been implemented recently and their bases as well as NRC's expectations for new initiatives to further improve safety. The figures contained in Appendix A to the volume correspond to the slides that were shown during the presentations. Volume 2 of this report contains the formal papers that were distributed at the beginning of the Regulatory Information Conference and other information about the conference

  9. NRC regulatory uses of PSA

    International Nuclear Information System (INIS)

    Murley, T.E.

    1991-01-01

    The publication in 1975 of WASH-1400, with its new probabilistic safety assessment (PSA) methodology, had the effect of presenting a pair of eyeglasses to a man with poor eyesight. Suddenly, it gave us a view of nuclear safety with a new clarity, and it allowed us to sort out the important safety issues from the unimportant. In the intervening years, PSA insights have permeated the fabric of nearly all our safety judgments. This acceptance can be seen from the following list of broad areas where the Nuclear Regulatory Commission (NRC) staff uses PSA insights and methodology: evaluating the safety significance of operating events and recommending safety improvements where warranted; requesting licensees to systematically look for design vulnerabilities in each operating reactor; evaluating the safety significance of design weaknesses or non-compliances when judging the time frame for necessary improvements; conducting sensitivity analyses to judge where safety improvements are most effective; assessing the relative safety benefits of design features for future reactors. In judging where PSA methodology can be improved to give better safety insights, it is believed that the following areas need more attention: better modeling of cognitive errors; more comprehensive modeling of accident sequences initiated from conditions other than full power; more comprehensive modeling of inter-system loss of coolant accident (ISLOCA) sequences. Although PSA is widely used in the staff's regulatory activities, the NRC deliberately chooses not to include probabilistic prescriptions in regulations or guidance documents. The staff finds the bottom line risk estimates to be one of the least reliable products of a PSA. The reason for this view is that PSA cannot adequately address cognitive errors nor assess the effects of a pervasive poor safety attitude

  10. 78 FR 44279 - Regulatory Agenda

    Science.gov (United States)

    2013-07-23

    ... Vol. 78 Tuesday, No. 141 July 23, 2013 Part XI Department of Justice Semiannual Regulatory Agenda #0;#0;Federal Register / Vol. 78 , No. 141 / Tuesday, July 23, 2013 / Unified Agenda#0;#0; [[Page 44280

  11. 76 FR 57006 - Proposed Generic Communications; Draft NRC Regulatory Issue Summary 2011-XX; NRC Regulation of...

    Science.gov (United States)

    2011-09-15

    ... NUCLEAR REGULATORY COMMISSION 10 CFR Parts 30 and 150 [NRC-2011-0146] Proposed Generic Communications; Draft NRC Regulatory Issue Summary 2011-XX; NRC Regulation of Military Operational Radium-226... published for public comment the proposed draft RIS 2011-XX; NRC Regulation of Military Operational Radium...

  12. Review of NRC Regulatory processes and functions

    International Nuclear Information System (INIS)

    1980-01-01

    The Advisory Committee on Reactor Safeguards (ACRS) has spent much time over many years observing and examining the NRC licensing process. The Committee is, consequently, in a position to comment on the situation, and it believes this review will be helpful to those examining the regulatory process by discussing how it works, where it is weak, and the opportunities for improvement. The Committee's review may also help put current proposals and discussions in perspective

  13. Small Business Administration Semiannual Regulatory Agenda

    Science.gov (United States)

    2010-12-20

    ... small business concerns owned and controlled by women, and to women wishing to start a small business... Business Administration Semiannual Regulatory Agenda] Part XVII Small Business Administration Semiannual Regulatory Agenda [[Page 79864

  14. 76 FR 10072 - Proposed Generic Communications; Draft NRC Regulatory Issue Summary 2011-XX, Adequacy of Station...

    Science.gov (United States)

    2011-02-23

    ... NUCLEAR REGULATORY COMMISSION [NRC-2011-0013] Proposed Generic Communications; Draft NRC Regulatory Issue Summary 2011-XX, Adequacy of Station Electric Distribution System Voltages; Reopening of... (NRC's) Draft Regulatory Issue Summary 2011-XX, Adequacy of Station Electric Distribution System...

  15. 75 FR 21889 - Semiannual Regulatory Agenda

    Science.gov (United States)

    2010-04-26

    ... assistance to small business concerns owned and controlled by women, and to women wishing to start a small... Part XVI Small Business Administration ###Semiannual Regulatory Agenda### [[Page 21890

  16. Presentation on NRC Regulatory Positions and guidelines

    International Nuclear Information System (INIS)

    Russell, W.T.

    1994-01-01

    The NRC staff recognizes the potential for enhanced safety and reliability that digital systems bring to the nuclear industry. The staff also recognizes the challenges to safety that are unique to digital systems implementation

  17. Regulatory decision with EPA/NRC/DOE/State Session (Panel)

    Energy Technology Data Exchange (ETDEWEB)

    O`Donnell, E.

    1995-12-31

    This panel will cover the Nuclear Regulatory Commission`s (NRC) proposed radiation limits in the Branch Technical Position on Low-Level Radioactive Waste Performance Assessment and the Environmental Protection Agency`s (EPA) draft regulation in Part 193. Representatives from NRC and EPA will discuss the inconsistencies in these two regulations. DOE and state representatives will discuss their perspective on how these regulations will affect low-level radioactive waste performance assessments.

  18. Status report on NRC's current below regulatory concern activities

    International Nuclear Information System (INIS)

    Dragonette, K.S.

    1988-01-01

    The concept of below regulatory concern (BRC) is not new to the Nuclear Regulatory Commission (NRC) or its predecessor agency, the Atomic Energy Commission. The regulations and licensing decisions have involved limited and de facto decisions on BRC since the beginning. For example, consumer products containing radioactive materials have been approved for distribution to persons exempt from licensing for some time and procedures for survey and release of equipment have traditionally been a part of many licensees' radiation safety programs. However, these actions have generally been ad hoc decisions in response to specific needs and have not been necessarily consistent. The need to deal with this regulatory matter has been receiving attention from both Congress and the NRC Commissioners. NRC response has grown from addressing specific waste streams, to generic rulemaking for wastes, and finally to efforts to develop a broad generic BRC policy. Section 10 of the Low-Level Radioactive Waste Policy Amendments Act of 1985 addressed NRC actions on specific waste streams. In response, NRC issued guidance on rulemaking petitions for specific wastes. NRC also issued an advance notice of proposed rulemaking indicating consideration of Commission initiated regulations to address BRC wastes in a generic manner. The Commissioners have directed staff to develop an umbrella policy for all agency decisions concerning levels of risk or dose that do not require government regulation

  19. Future of Nuclear Power: NRC emergency preparedness licensing activities agenda

    International Nuclear Information System (INIS)

    Essig, T.H.

    1995-01-01

    This talk summary addresses the issue of how future policies of the NRC will affect nuclear power in areas such as construction, emergency preparedness, and licensing. Specific topics covered include the following: Emergent EP licensing issues for operating nuclear Power Plants; 10CFR Part 52 and the process for licensing of Advanced Light Water Reactors (ALWRs); and potential revisions to emergency preparedness programs for future nuclear power plants

  20. A global regulatory science agenda for vaccines.

    Science.gov (United States)

    Elmgren, Lindsay; Li, Xuguang; Wilson, Carolyn; Ball, Robert; Wang, Junzhi; Cichutek, Klaus; Pfleiderer, Michael; Kato, Atsushi; Cavaleri, Marco; Southern, James; Jivapaisarnpong, Teeranart; Minor, Philip; Griffiths, Elwyn; Sohn, Yeowon; Wood, David

    2013-04-18

    The Decade of Vaccines Collaboration and development of the Global Vaccine Action Plan provides a catalyst and unique opportunity for regulators worldwide to develop and propose a global regulatory science agenda for vaccines. Regulatory oversight is critical to allow access to vaccines that are safe, effective, and of assured quality. Methods used by regulators need to constantly evolve so that scientific and technological advances are applied to address challenges such as new products and technologies, and also to provide an increased understanding of benefits and risks of existing products. Regulatory science builds on high-quality basic research, and encompasses at least two broad categories. First, there is laboratory-based regulatory science. Illustrative examples include development of correlates of immunity; or correlates of safety; or of improved product characterization and potency assays. Included in such science would be tools to standardize assays used for regulatory purposes. Second, there is science to develop regulatory processes. Illustrative examples include adaptive clinical trial designs; or tools to analyze the benefit-risk decision-making process of regulators; or novel pharmacovigilance methodologies. Included in such science would be initiatives to standardize regulatory processes (e.g., definitions of terms for adverse events [AEs] following immunization). The aim of a global regulatory science agenda is to transform current national efforts, mainly by well-resourced regulatory agencies, into a coordinated action plan to support global immunization goals. This article provides examples of how regulatory science has, in the past, contributed to improved access to vaccines, and identifies gaps that could be addressed through a global regulatory science agenda. The article also identifies challenges to implementing a regulatory science agenda and proposes strategies and actions to fill these gaps. A global regulatory science agenda will enable

  1. Handbook for value-impact assessments of NRC regulatory actions

    International Nuclear Information System (INIS)

    Mullen, M.F.; DiPalo, A.J.

    1985-01-01

    According to current Nuclear Regulatory Commission (NRC) procedures, value-impact (cost-benefit) assessments must be prepared for all rulemaking actions and for a broad range of other regulatory requirements and guidance. Probabilistic risk assessment (PRA) methods furnish an important part of the information base for these assessments. PRA methods are frequently the principal quantitative tool for estimating the benefits (e.g., public risk reduction) of proposed regulatory actions. In December 1983, the NRC published A Handbook for Value-Impact Assessment, NUREG/CR-3568, which provides a set of systematic procedures for performing value-impact assessments. The Handbook contains methods, data, and sources of information that can assist the regulatory analyst in conducting such assessments. The use of probabilistic risk analysis to estimate the benefits of proposed regulatory actions is described. Procedures and methods are also given for evaluating the costs and other consequences associated with regulatory actions. The Handbook has been adopted by the NRC as the recommended guideline for value impact assessments. This paper presents the background, objectives, and scope of the Handbook, describes the value-impact assessment methods (including the use of probabilistic risk assessment to estimate benefits), and discusses a selection of current and planned applications, with examples to illustrate how the methods are used

  2. 76 FR 40204 - Unified Agenda of Federal Regulatory and Deregulatory Actions

    Science.gov (United States)

    2011-07-07

    ... source material by adding specific requirements for licensing of and reporting by distributors of..., ``Regulatory Planning and Review.'' The agenda is a compilation of all rules on which the NRC has recently... Distribution of Source 3150-AH15 Material To Exempt Persons and General Licensees and Revision of General...

  3. Federal Trade Commission Semiannual Regulatory Agenda

    Science.gov (United States)

    2010-12-20

    ...) Retail Food Store Advertising and Marketing Practices, 16 CFR 424; (8) the Negative Option Rule, 16 CFR... Deregulatory Actions includes The Regulatory Plan, which appears in both the online Unified Agenda and in part... available online at www.reginfo.gov , in a format that offers users a greatly enhanced ability to obtain...

  4. 78 FR 1634 - Regulatory Agenda

    Science.gov (United States)

    2013-01-08

    ... amendments include updates to organizational information, use of the term ``disability'' in lieu of the term.../00/13 Regulatory Flexibility Analysis Required: No. Agency Contact: Robert W. Cosgrove, External...

  5. 78 FR 44329 - Regulatory Agenda

    Science.gov (United States)

    2013-07-23

    ... amendments include updates to organizational information, use of the term ``disability'' in lieu of the term.../00/13 Regulatory Flexibility Analysis Required: No. Agency Contact: Robert W. Cosgrove, External...

  6. Analysis of NRC Regulatory Guide 1.21 Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Sung Il; Yook, Dae Sik; Lee, Byung Soo [KINS, Daejeon (Korea, Republic of)

    2015-05-15

    It is essential to have a degree of uniformity in the methods used for measuring, evaluating, recording, and reporting data on radioactive material in effluents and solid wastes. For this purpose, the U.S. Nuclear Regulatory Commission (NRC) released a revised version of the Regulatory Guide 1.21 'Measuring, evaluating, and reporting radioactive material in liquid and gaseous effluents and solid waste' (revision 2) in 2009, updating the revision 1 version released in 1974. This study compares the previous revision 1 (1974) version with the revision 2 (2009) version to elaborate on the application of the guidelines to Korea. This study consists of an analysis of the 2009 Revision 2 version of the U.S. NRC Regulatory Guidelines 1.21 and an exposition of methods for its application in the domestic environment. Major revisions were made to allow for the adoption of a risk informed approach. Radionuclides with lower than 1% contribution to emission or radiation levels can be selected as principal radionuclides. Requirements for analysis of leaks and spills have been reinforced, with additional groundwater monitoring and hydrological data analysis becoming necessary.

  7. Changing emphasis at the NRC's Office of Nuclear Regulatory Research

    International Nuclear Information System (INIS)

    Remick, F.J.

    1994-01-01

    One of the major objectives of the Office of Research is to ensure availability of sound technical information for timely decision making in support of the NRC's safety mission. The Office of Research is changing some of its emphasis to better meet the expected needs of the NRC's regulatory offices. Long-standing programs in support of operating reactors are nearing completion. These programs include plant aging and severe accident research for currently operating plants. This meeting will also address the new challenges faced by the NRC in its review of the advanced light water and non-light water reactors. As plant aging and severe accident research programs are nearing completion, the research activities are coming to focus on the emerging technologies, for example, digital instrumentation and control systems, both as replacement equipment for operating plants and as the technology of choice and necessity for the advanced reactors. Necessity, because analog equipment is becoming obsolete. Other examples include the use of new materials in operating plants, human factors considerations in the design and operation of the advanced plants, thermal-hydraulic characteristics of the advanced reactors, and new construction techniques

  8. Overview of NRC's human factors regulatory research program

    International Nuclear Information System (INIS)

    Coffman, F.D. Jr.

    1989-01-01

    The human factors research program is divided into distinct and interrelated program activities: (1) Personnel Performance measurement, (2) Personnel Subsystem, (3) Human-System Interface, (4) Organization and Management, and (5) a group of Reliability Assessment activities. The purpose of the Personnel Performance Measurement activity is to improve the Agency's understanding of the factors influencing personnel performance and the effects on the safety of nuclear operations and maintenance by developing improvements to methods for collecting and managing personnel performance data. Personnel Subsystem research will broaden the understanding of such factors as staffing, qualifications, and training that influence human performance in the nuclear system and will develop the technical basis for regulatory guidance to reduce any adverse impact of these influences on nuclear safety. Research in the Human-System Interface activity will provide the technical basis for ensuring that the interface between the system and the human user supports safe operations and maintenance. Organization and Management research will result in the development of tools for evaluating organization and management issues within the nuclear industry. And finally, the Reliability Assessment group of activities includes multidisciplinary research that will integrate human and hardware considerations for evaluating reliability and risk in NRC licensing, inspection, and regulatory decisions

  9. Pilot program: NRC severe reactor accident incident response training manual: US Nuclear Regulatory Commission response

    International Nuclear Information System (INIS)

    Sakenas, C.A.; McKenna, T.J.; Perkins, K.; Miller, C.W.; Hively, L.M.; Sharpe, R.W.; Giitter, J.G.; Watkins, R.M.

    1987-02-01

    This pilot training manual has been written to fill the need for a general text on NRC response to reactor accidents. The manual is intended to be the foundation for a course for all NRC response personnel. US Nuclear Regulatory Commission Response is the fifth in a series of volumes that collectively summarize the US Nuclear Regulatory Commission (NRC) emergency response during severe power reactor accidents and provide necessary background information. This volume describes NRC response modes, organizations, and official positions; roles of other federal agencies are also described briefly. Each volume serves, respectively, as the text for a course of instruction in a series of courses for NRC response personnel. These materials do not provide guidance or license requirements for NRC licensees. Each volume is accompanied by an appendix of slides that can be used to present this material. The slides are called out in the text

  10. 75 FR 79929 - Semiannual Regulatory Agenda

    Science.gov (United States)

    2010-12-20

    ... Respect to Mortgage Loans, to be codified at 16 CFR 321, 322; (7) Retail Food Store Advertising and..., which appears in both the online Unified Agenda and in part II of the Federal Register that includes the... disseminating the Unified Agenda. The complete Unified Agenda will be available online at www.reginfo.gov, in a...

  11. 75 FR 79811 - Department Regulatory Agenda; Semiannual Summary

    Science.gov (United States)

    2010-12-20

    ....S.C. 602), DOT's printed agenda entries include only: 1. The Agency's agenda preamble; 2. Rules that... Regulatory Flexibility Act. Printing of these entries is limited to fields that contain information required... transfer of the functions from the Office of Emergency Transportation (OET) to the Office of Intelligence...

  12. Respirator studies for the Nuclear Regulatory Commission (NRC)

    International Nuclear Information System (INIS)

    Skaggs, B.J.; Fairchild, C.I.; DeField, J.D.; Hack, A.L.

    1985-01-01

    A project of the Health, Safety and Environment Division is described. The project provides the NRC with information of respiratory protective devices and programs for their licensee personnel. The following activities were performed during FY 1983: selection of alternate test aerosols for quality assurance testing of high-efficiency particulate air respirator filters; evaluation of MAG-1 spectacles for use with positive and negative-pressure respirators; development of a Manual of Respiratory Protection in Emergencies Involving Airborne Radioactive Materials, and technical assistance to NRC licensees regarding respirator applications. 2 references, 1 figure

  13. NRC review of passive reactor design certification testing programs: Overview, progress, and regulatory perspective

    Energy Technology Data Exchange (ETDEWEB)

    Levin, A.E.

    1995-09-01

    New reactor designs, employing passive safety systems, are currently under development by reactor vendors for certification under the U.S. Nuclear Regulatory Commission`s (NRC`s) design certification rule. The vendors have established testing programs to support the certification of the passive designs, to meet regulatory requirements for demonstration of passive safety system performance. The NRC has, therefore, developed a process for the review of the vendors` testing programs and for incorporation of the results of those reviews into the safety evaluations for the passive plants. This paper discusses progress in the test program reviews, and also addresses unique regulatory aspects of those reviews.

  14. A review of NRC regulatory processes and functions

    International Nuclear Information System (INIS)

    1981-05-01

    A reexamination by the ACRS of the Regulatory Process has been made. Objectives were to provide in a single source, ACRS' understanding of the Regulatory Process and to point out perceived weaknesses and to make appropriate recommendations for change

  15. 75 FR 21951 - Semiannual Regulatory Agenda

    Science.gov (United States)

    2010-04-26

    ... CFR 321, 322; (10) Retail Food Store Advertising and Marketing Practices, 16 CFR 424; (11) the... complete Unified Agenda is available online at www.reginfo.gov. Because publication in the Federal Register..., 16 CFR 310; (7) Children's Online Privacy Protection Rule, 16 CFR 312; (8) Privacy of Consumer...

  16. Department of Transportation Semiannual Regulatory Agenda

    Science.gov (United States)

    2010-04-26

    ... agenda provides the following information: (1) Its ``significance''; (2) a short, descriptive title; (3... efficiency, renewable energy technologies, occupational safety, and drug-free workplace 48 CFR part 1224... legislation. Finding of this 5 U.S.C. section 610 analysis and review: Between April 2003 and January 2005...

  17. 78 FR 44315 - Spring 2013 Regulatory Agenda

    Science.gov (United States)

    2013-07-23

    ... characteristics of the entries of interest in the desired individual data fields for both the www.reginfo.gov and www.regulations.gov versions of the e-Agenda. You can sort based on the following characteristics: EPA... EPA-HQ-OAR-2012-0816 Emissions Standards for Hazardous Air Pollutants (NESHAP): Reinforced Plastic...

  18. Federal Reserve System Semiannual Regulatory Agenda

    Science.gov (United States)

    2010-04-26

    .... DATES: Comments about the form or content of the agenda may be submitted any time during the next 6... prohibit certain payments to mortgage brokers and loan officers that are based on the loan's terms and... compensation received. New rules regarding eligibility restrictions and disclosures for credit insurance and...

  19. 75 FR 21949 - Semiannual Regulatory Flexibility Agenda

    Science.gov (United States)

    2010-04-26

    ... be published in fall 2010. DATES: Comments about the form or content of the agenda may be submitted..., the proposal would prohibit certain payments to mortgage brokers and loan officers that are based on... interest to increase compensation received. New rules regarding eligibility restrictions and disclosures...

  20. 78 FR 44275 - Semiannual Regulatory Agenda

    Science.gov (United States)

    2013-07-23

    ... Rights. National Park Service--Completed Actions Regulation Sequence No. Title Identifier No. 200 Winter.... Timetable: Action Date FR Cite NPRM 07/00/13 Final Action 05/00/14 Regulatory Flexibility Analysis Required...: Action Date FR Cite NPRM 10/00/14 Final Action 10/00/14 Regulatory Flexibility Analysis Required: Yes...

  1. 77 FR 8082 - Regulatory Flexibility Agenda

    Science.gov (United States)

    2012-02-13

    ... Required: Yes. Agency Contact: Alicia Goldin, Division of Trading and Markets, Securities and Exchange.../01/11 Regulatory Flexibility Analysis Required: Yes. Agency Contact: Alicia Goldin, Division of... Withdrawn 10/01/11 Regulatory Flexibility Analysis Required: Yes. Agency Contact: Alicia Goldin, Division of...

  2. Implementation of safety goals in NRC's regulatory process

    International Nuclear Information System (INIS)

    Murley, T.E.

    1985-01-01

    In May 1983 the Nuclear Regulatory Commission issued a policy statement on Safety Goals For Nuclear Power Plant Operation. The Commission at the same time judged that a two-year evaluation period was necessary to judge the effectiveness of the goals and design objectives, and directed the staff to develop information and understanding as to how to further define and use the design objectives and the cost-benefit guidelines. In carrying out the Commission's mandate, the staff framed three major questions to be addressed during the safety goal evaluation period. These three questions are: 1) to what extent is it practical to use safety goals in the regulatory process. 2) Should the quantitative design objectives be modified or supplemented. If so, how. 3) How should the safety goals be implemented at the end of the evaluation period. The staff's conclusions are discussed

  3. 76 FR 40200 - Semiannual Regulatory Flexibility Agenda

    Science.gov (United States)

    2011-07-07

    ... System, Legal Division, Phone: 202 452-2412, E-mail: [email protected]frb.gov . RIN: 7100-AD65 446... Vol. 76 Thursday, No. 130 July 7, 2011 Part XXI Federal Reserve System Semiannual Regulatory... 40200

  4. 75 FR 21871 - Spring 2010 Regulatory Agenda

    Science.gov (United States)

    2010-04-26

    ... Review 10/00/10 Regulatory Flexibility Analysis Required: No Agency Contact: Tad Wysor, Environmental...: wysor.tad@epamail.epa.gov Tom Eagles, Environmental Protection Agency, Air and Radiation, 6103A...

  5. Department of the Treasury Semiannual Regulatory Agenda

    Science.gov (United States)

    2010-12-20

    ..., money laundering, and other financial crime. The proposed changes are intended to address regulatory... for the use of prepaid access as a means for furthering money laundering, terrorist financing, and...) exempting certain categories of prepaid access products and services posing lower risks of money laundering...

  6. 77 FR 8020 - Semiannual Regulatory Agenda

    Science.gov (United States)

    2012-02-13

    ... (Reg Plan Seq No. 148). 452 Small Business Innovation 3245-AF84 Research (SBIR) Program Policy... Business Innovation Research (SBIR) Program Policy Directive Regulatory Plan: This entry is Seq. No. 149 in... proposal for a contract and that if the percentage is not met, the large business prime contractor must...

  7. 78 FR 1624 - Fall 2012 Regulatory Agenda

    Science.gov (United States)

    2013-01-08

    ...), studies or analyses of the possible need for regulatory action, requests for public comment on the need... (NESHAP): Reinforced Plastic Composites Production To comment or learn more about these retrospective.... Agency Contact: Hans Scheifele, Environmental Protection Agency, Office of Chemical Safety and Pollution...

  8. 77 FR 8072 - Semiannual Regulatory Flexibility Agenda

    Science.gov (United States)

    2012-02-13

    ... six months. ADDRESSES: Comments should be addressed to Jennifer J. Johnson, Secretary of the Board... Regulatory and Deregulatory Actions, which is coordinated by the Office of Management and Budget under... pledged; and certain other elements including a strategic analysis of the company's plans for maintaining...

  9. 77 FR 7968 - Semiannual Regulatory Agenda

    Science.gov (United States)

    2012-02-13

    ... Regulation Sequence No. Title Identifier No. 392 Non-Federal Oil and Gas 1024-AD78 Rights. National Park.... Timetable: Action Date FR Cite NPRM 07/00/12 Regulatory Flexibility Analysis Required: Yes. Agency Contact... anaconda, and Beni anaconda. Timetable: Action Date FR Cite ANPRM 01/31/08 73 FR 5784 ANPRM Comment Period...

  10. 78 FR 1570 - Semiannual Regulatory Agenda

    Science.gov (United States)

    2013-01-08

    ... Deregulatory Priorities. Gregory H. Woods, General Counsel. Energy Efficiency and Renewable Energy--Proposed... Action 10/01/12 77 FR 59719 Regulatory Flexibility Analysis Required: Yes. Agency Contact: Stephen Witkowski, Phone: 202 586-7463, Email: stephen[email protected] . RIN: 1904-AB90 [FR Doc. 2012-31497...

  11. NRC [Nuclear Regulatory Commission] safety research in support of regulation, 1987

    International Nuclear Information System (INIS)

    1988-05-01

    This report, the third in a series of annual reports, was prepared in response to congressional inquiries concerning how nuclear regulatory research is used. It summarizes the accomplishments of the Office of Nuclear Regulatory Research during 1987. The goal of this office is to ensure that research provides the technical bases for rulemaking and for related decisions in support of NRC licensing and inspection activities. This report describes both the direct contributions to scientific and technical knowledge with regard to nuclear safety and their regulatory applications

  12. Bibliography of reports on research sponsored by the NRC Office of Nuclear Regulatory Research, July--December 1976

    Energy Technology Data Exchange (ETDEWEB)

    Buchanan, J.R.

    1977-03-01

    A bibliography of 148 reports published by contractors of the NRC Office of Nuclear Regulatory Research during the period July through December 1976 is presented along with abstracts from the Nuclear Safety Information Center computer file. The bibliography has been sorted into the subject categories used by NRC to organize the research program. Within the subject categories, the reports are sorted by contractor organization and then chronologically. A brief description of the NRC research program precedes the bibliography.

  13. Bibliography of reports on research sponsored by the NRC office of nuclear regulatory research, July--December 1977

    International Nuclear Information System (INIS)

    Buchanan, J.R.

    1978-04-01

    A bibliography of 198 reports published by contractors of the NRC Office of Nuclear Regulatory Research during the period July through December 1977 is presented along with abstracts from the Nuclear Safety Information Center computer file. The bibliography has been sorted into the subject categories used by NRC to organize the research program. Within the subject categories, the reports are arranged first by contractor organization and then chronologically. A brief description of the NRC research program precedes the bibliography

  14. Bibliography of reports on research sponsored by the NRC Office of Nuclear Regulatory Research, July--December 1976

    International Nuclear Information System (INIS)

    Buchanan, J.R.

    1977-01-01

    A bibliography of 148 reports published by contractors of the NRC Office of Nuclear Regulatory Research during the period July through December 1976 is presented along with abstracts from the Nuclear Safety Information Center computer file. The bibliography has been sorted into the subject categories used by NRC to organize the research program. Within the subject categories, the reports are sorted by contractor organization and then chronologically. A brief description of the NRC research program precedes the bibliography

  15. Bibliography of reports on research sponsored by the NRC office of nuclear regulatory research, July--December 1977

    Energy Technology Data Exchange (ETDEWEB)

    Buchanan, J.R.

    1978-04-01

    A bibliography of 198 reports published by contractors of the NRC Office of Nuclear Regulatory Research during the period July through December 1977 is presented along with abstracts from the Nuclear Safety Information Center computer file. The bibliography has been sorted into the subject categories used by NRC to organize the research program. Within the subject categories, the reports are arranged first by contractor organization and then chronologically. A brief description of the NRC research program precedes the bibliography.

  16. Bibliography of reports on research sponsored by the NRC Office of Nuclear Regulatory Research, November 1975--June 1976

    Energy Technology Data Exchange (ETDEWEB)

    Buchanan, J.R.

    1976-09-30

    A bibliography of 152 reports published by contractors of the NRC Office of Nuclear Regulatory Research during the period November 1975 through June 1976 is presented along with abstracts from the Nuclear Safety Information Center computer file. The bibliography has been sorted into the subject categories used by NRC to organize the research program. Within the subject categories, the reports are sorted by contractor organization and then chronologically. A brief description of the NRC research program precedes the bibliography.

  17. Bibliography of reports on research sponsored by the NRC Office of Nuclear Regulatory Research, November 1975--June 1976

    International Nuclear Information System (INIS)

    Buchanan, J.R.

    1976-01-01

    A bibliography of 152 reports published by contractors of the NRC Office of Nuclear Regulatory Research during the period November 1975 through June 1976 is presented along with abstracts from the Nuclear Safety Information Center computer file. The bibliography has been sorted into the subject categories used by NRC to organize the research program. Within the subject categories, the reports are sorted by contractor organization and then chronologically. A brief description of the NRC research program precedes the bibliography

  18. NRC [Nuclear Regulatory Commission] perspective of software QA [quality assurance] in the nuclear history

    International Nuclear Information System (INIS)

    Weiss, S.H.

    1988-01-01

    Computer technology has been a part of the nuclear industry since its inception. However, it is only recently that computers have been integrated into reactor operations. During the early history of commercial nuclear power in the United States, the US Nuclear Regulatory Commission (NRC) discouraged the use of digital computers for real-time control and monitoring of nuclear power plant operation. At the time, this position was justified since software engineering was in its infancy, and horror stories on computer crashes were plentiful. Since the advent of microprocessors and inexpensive computer memories, significant advances have been made in fault-tolerant computer architecture that have resulted in highly reliable, durable computer systems. The NRC's requirement for safety parameter display system (SPDS) stemmed form the results of studies and investigations conducted on the Three Mile Island Unit 2 (TMI-2) accident. An NRC contractor has prepared a handbook of software QA techniques applicable to the nuclear industry, published as NUREG/CR-4640 in August 1987. Currently, the NRC is considering development of an inspection program covering software QA. Future efforts may address verification and validation as applied to expert systems and artificial intelligence programs

  19. Review of NRC Commission Papers on Regulatory Basis for Licensing and Regulating Reprocessing Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Park, Jae Yeong; Shin, Hyeong Ki [KINS, Daejeon (Korea, Republic of)

    2016-05-15

    Spent nuclear fuel (SNF) accumulated in nuclear power plant has been a serious issue in most countries with operating nuclear power plants. Direct disposal of SNF could be a solution of the problem but many countries including the Republic of Korea have had a hard time selecting a site for high level waste repository because of low public acceptance. SNF recycling technologies consisting of reprocessing and transmutation have been developed so as to reduce the final volume of the disposed radioactive waste and to diminish the radiotoxicity of the waste. The Republic of Korea is now developing pyroprocessing and sodium-cooled fast reactor (SFR) technology to be used for the recycling of the wastes. KAERI has a plan to construct a pyroprocessing facility with a capacity of 30 tHM/y and a facility manufacturing TRU fuel for SFR by 2025. However, to license these facility and secure the safety, the current regulatory system related to SNF treatment needs to be improved and amended since the system has been developed focusing on facilities to examine irradiated nuclear materials. Status of reprocessing facility regulations developed by U.S.NRC was reviewed based on SECY papers. U.S.NRC has approved the development of a new rule referred to nationally as '10CFR Part 7x'. Existing 10CFR 50 and 70 has been evolved mainly for nuclear power plants and fuel cycle facilities whose radiological hazard is much lower than reprocessing plants respectively. U.S.NRC also derived many regulatory gaps including safety assessment methods, technical specification, general design criteria and waste classification and continue to develop the regulatory framework limited in scope to the resolution of Gap 5.

  20. Cyber Security in Nuclear Power Plants - U.S. NRC Regulatory Guide 5.71

    International Nuclear Information System (INIS)

    Pogacic, Goran

    2014-01-01

    We have already made a big step into new millennia and with it there is no more dilemma about presence of computers and internet in our lives. Almost all modern facilities struggle with this new dimension of information flow and how to use it to their best interest. But there is also the other side of the coin- the security threat. For nuclear power plants this threat poses even greater risk. In addition to protecting their trade secrets, personal data or other common targets of cyber attacks, nuclear power plants need to protect their digital computers, communication systems and networks up to and including the design basis threat (DBT). As stated in U.S. Nuclear Regulatory Commission (NRC) Regulatory Commission Regulations, Title 10, Code of Federal Regulations (CFR), section 73.1, 'Purpose and Scope' this includes protection against acts of radiological sabotage and prevention of the theft or diversion of special nuclear material. The main purpose of this paper is to explore the NRC Regulatory Guide (RG) 5.71 and its guidance in implementing cyber security requirements stated in NRC 10 CFR, section 73.54, 'Protection of Digital Computer and Communication Systems and Networks'. In particular, this section requires protection of digital computers, communication systems and networks associated with the following categories of functions: · safety-related and important-to-safety functions, · security functions, · emergency preparedness functions, including offsite communication, and · support systems and equipment which, if compromised, would adversely impact safety, security, or emergency preparedness functions. This section requires protection of such systems and networks from those cyber attacks that would act to modify, destroy, or compromise the integrity or confidentiality of data or software; deny access to systems, services or data; and impact the operation of systems, networks, and equipment. This paper will also present some of

  1. NRC [Nuclear Regulatory Commission] staff evaluation of the General Electric Company Nuclear Reactor Study (''Reed Report'')

    International Nuclear Information System (INIS)

    1987-07-01

    In 1975, the General Electric Company (GE) published a Nuclear Reactor Study, also referred to as ''the Reed Report,'' an internal product-improvement study. GE considered the document ''proprietary'' and thus, under the regulations of the Nuclear Regulatory Commission (NRC), exempt from mandatory public disclosure. Nonetheless, members of the NRC staff reviewed the document in 1976 and determined that it did not raise any significant new safety issues. The staff also reached the same conclusion in subsequent reviews. However, in response to recent inquiries about the report, the staff reevaluated the Reed Report from a 1987 perspective. This re-evaluation, documented in this staff report, concluded that: (1) there are no issues raised in the Reed Report that support a need to curtail the operation of any GE boiling water reactor (BWR); (2) there are no new safety issues raised in the Reed Report of which the staff was unaware; and (3) although certain issues addressed by the Reed Report are still being studied by the NRC and the industry, there is no basis for suspending licensing and operation of GE BWR plants while these issues are being resolved

  2. NRC review of passive reactor design certification testing programs: Overview and regulatory perspective

    International Nuclear Information System (INIS)

    Levin, A.E.

    1993-01-01

    Reactor vendors are developing new designs for future deployment, including open-quotes passiveclose quotes light water reactors (LWRs), such as General Electric's (G.E.'s) simplified boiling water reactor (SBWR) and Westinghouse's AP600, which depend primarily on inherent processes, such as national convection and gravity feed, for safety injection and emergency core cooling. The U.S. Nuclear Regulatory Commission (NRC) has implemented a new process, certification of standardized reactor designs, for licensing these Plants. Part 52 of Title 10 of the Code of Federal Regulations (10CFR52) contains the requirements that vendors must meet for design certification. One important section, 10CFR52.47, reads open-quotes Certification of a standard design which . . . utilizes simplified, inherent, passive, or other innovative means to accomplish its safety functions will be granted only if: (1) The performance of each safety feature of the design has been demonstrated through either analysis, appropriate test programs, experience, or a combination thereof; (2) Interdependent effects among the safety features have been found acceptable by analysis, appropriate test programs, experience, or a combination thereof; and (3) Sufficient data exist on the safety features of the design to assess the analytical tools used for safety analyses. . . . The vendors have initiated programs to test innovative features of their designs and to develop data bases needed to validate their analytical codes, as required by the design certification rule. Accordingly, the NRC is reviewing and evaluating the vendors programs to ensure that they address adequately key issues concerning safety system performance. This paper provides an overview of the NRC's review process and regulatory perspective

  3. Working draft regulatory guide on release criteria for decommissioning: NRC staff's draft for comment

    International Nuclear Information System (INIS)

    Daily, M.C.; Huffert, A.; Cardile, F.; Malaro, J.C.

    1994-08-01

    The Nuclear Regulatory Commission's (NRC) regulations in 10 CFR 20 are being amended to include radiological criteria for decommissioning of lands and structures at nuclear facilities. 10 CFR Part 20, Subpart E establishes criteria for the remediation of contaminated sites or facilities that will allow their release for future use with or without restrictions. The criteria include a Total Effective Dose Equivalent (TEDE) limit of 15 mrem/year (0.15 mSv/y) that should not be exceeded by an average individual among those who could potentially receive the greatest exposure from any residual activity within a facility or on a site. The criteria also require a licensee to reduce any residual radioactivity to as-low-as-reasonably-achievable (ALARA) levels. This staff draft guide describes acceptable procedures for determining the predicted dose level (PDL) from any residual radioactivity at the site. It describes the basic features of the calculational models and the associated default assumptions and parameter values the NRC staff would find acceptable in calculating PDLs. Appendices A, B, and C provide numerical values that can be used to estimate the dose from residual radioactivity remaining at a site. Since 10 CFR Part 20, Subpart E introduces several new concepts, definitions and discussions are included in a regulatory position concepts section of the guide to assist licensees in understanding some of the philosophy underlying the rule

  4. 78 FR 44325 - Unified Agenda of Federal Regulatory and Deregulatory Actions

    Science.gov (United States)

    2013-07-23

    ... developed under the guidelines of Executive Order 12866 ``Regulatory Planning and Review.'' GSA's purpose in publishing this agenda is to allow interested persons an opportunity to participate in the rulemaking process... Internet has been the basic means for disseminating the Unified Agenda. The complete Unified Agenda will be...

  5. 78 FR 44403 - Unified Agenda of Federal Regulatory and Deregulatory Actions

    Science.gov (United States)

    2013-07-23

    ... agenda (the Agenda) in accordance with Public Law 96-354, ``The Regulatory Flexibility Act,'' and... goals; (2) support for the Strategic Plan organizational excellence objectives; (3) a governmental... Flexibility Act Section 610 of the Regulatory Flexibility Act (RFA) requires agencies to conduct a review...

  6. NRC [Nuclear Regulatory Commission] TLD [thermoluminescent dosimeter] direct radiation monitoring network

    International Nuclear Information System (INIS)

    Struckmeyer, R.; McNamara, N.

    1989-09-01

    This report provides the status and results of the NRC Thermoluminescent Dosimeter (TLD) Direct Radiation Monitoring Network. It presents the radiation levels measured in the vicinity of NRC licensed facility sites throughout the country for the second quarter of 1989

  7. 76 FR 40132 - Unified Agenda of Federal Regulatory and Deregulatory Actions

    Science.gov (United States)

    2011-07-07

    ... edition. This agenda was developed under the guidelines of Executive Order 12866, ``Regulatory Planning... participate in the rulemaking process. GSA also invites interested persons to recommend existing significant... the fall 2007 edition, the Internet has been the basic means for disseminating the Unified Agenda. The...

  8. 77 FR 8014 - Unified Agenda of Federal Regulatory and Deregulatory Actions

    Science.gov (United States)

    2012-02-13

    ... agenda was developed under the guidelines of Executive Order 12866 ``Regulatory Planning and Review... in the rulemaking process. GSA also invites interested persons to recommend existing significant... 2007 edition, the Internet has been the basic means for disseminating the Unified Agenda. The complete...

  9. 78 FR 1632 - Unified Agenda of Federal Regulatory and Deregulatory Actions

    Science.gov (United States)

    2013-01-08

    ... edition. This agenda was developed under the guidelines of Executive Order 12866 ``Regulatory Planning and... participate in the rulemaking process. GSA also invites interested persons to recommend existing significant... the fall 2007 edition, the Internet has been the basic means for disseminating the Unified Agenda. The...

  10. 77 FR 7663 - Introduction to the Unified Agenda of Federal Regulatory and Deregulatory Actions

    Science.gov (United States)

    2012-02-13

    ... Administration National Archives and Records Administration Office of Personnel Management Pension Benefit... National Indian Gaming Commission Nuclear Regulatory Commission AGENCY AGENDAS Cabinet Departments... has appeared in the Federal Register twice each year since 1983 and has been available online since...

  11. 75 FR 60485 - NRC Enforcement Policy Revision

    Science.gov (United States)

    2010-09-30

    ... NUCLEAR REGULATORY COMMISSION [NRC-2008-0497] NRC Enforcement Policy Revision AGENCY: Nuclear Regulatory Commission. ACTION: Policy statement. SUMMARY: The Nuclear Regulatory Commission (NRC or Commission) is publishing a major revision to its Enforcement Policy (Enforcement Policy or Policy) to...

  12. International certification of nuclear power reactors design. A proposal from the U.S. NRC (Nuclear Regulatory Commission)

    International Nuclear Information System (INIS)

    Felizia, Eduardo R.

    2006-01-01

    The proposal foundations of the Nuclear Regulatory Commission Board Chairman are briefly described, which were enunciated at a meeting on Fourth Generation Reactors (Washington, March 2005). This proposal is analyzed mainly from the point of view of its consequences in third countries buyers of nuclear technology. The analysis is complemented by descriptions of the current process of the NRC design certification and of Third and Fourth Generation Reactors. (author) [es

  13. Combination of the deterministic and probabilistic approaches for risk-informed decision-making in US NRC regulatory guides

    International Nuclear Information System (INIS)

    Patrik, M.; Babic, P.

    2001-06-01

    The report responds to the trend where probabilistic safety analyses are attached, on a voluntary basis (as yet), to the mandatory deterministic assessment of modifications of NPP systems or operating procedures, resulting in risk-informed type documents. It contains a nearly complete Czech translation of US NRC Regulatory Guide 1.177 and presents some suggestions for improving a) PSA study applications; b) the development of NPP documents for the regulatory body; and c) the interconnection between PSA and traditional deterministic analyses as contained in the risk-informed approach. (P.A.)

  14. 78 FR 1562 - Improving Government Regulations; Unified Agenda of Federal Regulatory and Deregulatory Actions

    Science.gov (United States)

    2013-01-08

    ... agenda incorporates the objective and criteria, when applicable, of the regulatory reform program under the Executive Order and other regulatory guidance. It contains DoD issuances initiated by DoD... statutory administration requirements as required. Starting with the fall 2007 edition, the Internet became...

  15. 77 FR 7930 - Improving Government Regulations; Unified Agenda of Federal Regulatory and Deregulatory Actions

    Science.gov (United States)

    2012-02-13

    ... the Regulatory Flexibility Act (5 U.S.C. 602), the Department of Defense's printed agenda entries... section 610 of the Regulatory Flexibility Act. Printing of these entries is limited to fields that contain...D Intelligence Interrogations, Detainee Debriefings, and Tactical Questioning. This rule only...

  16. Significant NRC Enforcement Actions

    Data.gov (United States)

    Nuclear Regulatory Commission — This dataset provides a list of Nuclear Regulartory Commission (NRC) issued significant enforcement actions. These actions, referred to as "escalated", are issued by...

  17. Survey by senior NRC management to obtain veiwpoints on the safety impact of regulatory activities from representative utilities operating and constructing nuclear power plants

    International Nuclear Information System (INIS)

    1981-08-01

    A survey of licensee staff members representing the several organizational elements in different licensee corporate and plant staffs was conducted by senior NRC management to obtain licensee views on the potential safety consequences and impact of NRC regulatory activities. The comments received addressed the full scope of NRC activities and the negative impact of agency actions on licensee resources, staff performance, planning and scheduling, and organizational effectiveness. The findings of the survey is that the pace and nature of regulatory actions have created a potential safety problem which deserves further evaluation by the agency

  18. 78 FR 44287 - Department Regulatory Agenda; Semiannual Summary

    Science.gov (United States)

    2013-07-23

    ... . Among other things, this Web site provides a report, updated monthly, on the status of the DOT... identify an individual rulemaking in the Agenda and facilitate tracing further action on the issue; (13... U.S.C. 41712(c)) and the Department's enforcement policy with respect to Web site disclosure of code...

  19. 78 FR 3289 - Department Regulatory Agenda; Semiannual Summary

    Science.gov (United States)

    2013-01-15

    ... things, this Web site provides a report, updated monthly, on the status of the DOT significant... rulemaking in the Agenda and facilitate tracing further action on the issue; (13) whether the action is... Department's enforcement policy with respect to Web site disclosure of code-share and long term wet lease...

  20. Regulatory Multidimensionality of Gas Vesicle Biogenesis in Halobacterium salinarum NRC-1

    Directory of Open Access Journals (Sweden)

    Andrew I. Yao

    2011-01-01

    Full Text Available It is becoming clear that the regulation of gas vesicle biogenesis in Halobacterium salinarum NRC-1 is multifaceted and appears to integrate environmental and metabolic cues at both the transcriptional and posttranscriptional levels. The mechanistic details underlying this process, however, remain unclear. In this manuscript, we quantify the contribution of light scattering made by both intracellular and released gas vesicles isolated from Halobacterium salinarum NRC-1, demonstrating that each form can lead to distinct features in growth curves determined by optical density measured at 600 nm (OD600. In the course of the study, we also demonstrate the sensitivity of gas vesicle accumulation in Halobacterium salinarum NRC-1 on small differences in growth conditions and reevaluate published works in the context of our results to present a hypothesis regarding the roles of the general transcription factor tbpD and the TCA cycle enzyme aconitase on the regulation of gas vesicle biogenesis.

  1. 75 FR 79449 - Introduction to The Regulatory Plan and the Unified Agenda of Federal Regulatory and Deregulatory...

    Science.gov (United States)

    2010-12-20

    ... Administration 79677 Office of Personnel Management 79679 Pension Benefit Guaranty Corporation 79681 Small... National Indian Gaming Commission 79706 Postal Regulatory Commission 79708 AGENCY AGENDAS Cabinet... Register twice each year since 1983 and has been available online since 1995. To further the objective of...

  2. NRC TLD [Nuclear Regulatory Commission thermoluminescent dosimeter] direct radiation monitoring network

    International Nuclear Information System (INIS)

    Struckmeyer, R.; McNamara, N.

    1990-03-01

    This report presents the results of the NRC Direct Radiation Monitoring Network for the fourth quarter of 1989. It provides the ambient radiation levels measured in the vicinity of 75 sites throughout the United States. In addition, it describes the equipment used, monitoring station selection criteria, characterization of the dosimeter response, calibration procedures, statistical methods, intercomparison, and quality assurance program

  3. An assessment of the contribution of NRC [Nuclear Regulatory Commission] regulatory growth to nuclear plant cost growth using engineering scope changes

    International Nuclear Information System (INIS)

    Cohen, S.

    1987-03-01

    The purpose of this study is to determine the contribution of NRC regulations to the growth in nuclear power plant capital costs using the case study method. The two plants selected for the case studies are Florida Power and Light Company's (FP and L) St. Lucie Unit 1 (SL1) and St. Lucie Unit 2 (SL2). SL1 was constructed in the early 1970s and was granted an operating license in 1976. SL2 was constructed in the late 1970s and early 1980s, and was granted an operating license in 1983. The information bases were the amendments to the contracts between FP and L and its architect-engineer/constructor, i.e., the ''scope changes''. These were examined and analyzed for causation, i.e., NRC-initiated or utility-initiated, and all of the costs associated with scope changes of each type were aggregated to determine the contribution of each. Although the scope changes accounted for only a small fraction of the total cost growth for either plant, they were still used to determine the relative contribution of regulatory growth to cost growth. Unexpectedly, a significantly higher percentage of out-of-scope work (approximately 84%) was attributable to NRC regulatory requirements for SL1 than SL2 (approximately 47%). These results were unexpected because SL2 was constructed during a period in which regulation was considered to be particularly unstable. However, a more detailed analysis of causation indicates that a shift occurred from an ad-hoc mode of regulation in the early 1970s to a more prescriptive process in the late 1970s. Thus the number of formal NRC requirements may not be a valid measure of regulatory stability

  4. Assessment of operational safety data in the Nuclear Regulatory Commission (NRC)

    International Nuclear Information System (INIS)

    Michelson, C.; Heltemes, C.J.

    1981-01-01

    The collection, assessment, and dissemination of operational safety data, including the Licensee Event Reports (LERs) is the principal activity of the NRC's Office for Analysis and Evaluation of Operational Data (AEOD). This office was recently formed to provide a dedication to this activity. It has been staffed and fully operational since April 1980. The office programs are evolving and include some new ideas and techniques to aid in the assessment of LERs. For example, the office is managing the development of a computer-based Sequence Coding and Search (SCS) procedure which will have the capability to store and retrieve the detail and individual sequences associated with each LER. Such events may be rather complex and involve a number of isolated or unrelated happenings associated with multiple systems and components with various causes, failure modes, and failure effects. Thus, the SCS system is particularly useful because it documents in a computer-retrievable form not only the principal occurrence, but also related component and system responses which precede, accompany, follow, or result from the principal occurrence. Also noteworthy is the Power Reactor Watch List which is being developed and monitored as a part of the AEOD program

  5. 76 FR 54986 - NRC Enforcement Policy

    Science.gov (United States)

    2011-09-06

    ... NUCLEAR REGULATORY COMMISSION 10 CFR Chapter I [NRC-2011-0209] NRC Enforcement Policy AGENCY: Nuclear Regulatory Commission. ACTION: Proposed enforcement policy revision; request for comment. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC or the Commission) is soliciting comments from interested...

  6. Legal and regulatory capacity to support the global health security agenda.

    Science.gov (United States)

    Morhard, Ryan; Katz, Rebecca

    2014-01-01

    On February 13, 2014, 27 nations, along with 3 international organizations, launched the Global Health Security Agenda (GHSA). The intent of GHSA is to accelerate progress in enabling countries around the world to prevent, detect, and respond to public health emergencies-capacities to be achieved through 9 core objectives. Building national, regional, and international capacity includes creating strong legal and regulatory regimes to support national and international capacities to prevent, detect, and respond to public health emergencies. Accordingly, establishing and reinforcing international and national-level legal preparedness is central to advancing elements of each of the 9 objectives of the GHSA.

  7. NRC regulation of DOE facilities

    International Nuclear Information System (INIS)

    Buhl, A.R.; Edgar, G.; Silverman, D.; Murley, T.

    1997-01-01

    The US Department of Energy (DOE), its contractors, and the Nuclear Regulatory Commission (NRC) are in for major changes if the DOE follows through on its intentions announced December 20, 1996. The DOE is seeking legislation to establish the NRC as the regulatory agency with jurisdiction over nuclear health, safety, and security at a wide range of DOE facilities. At this stage, it appears that as many as 200 (though not all) DOE facilities would be affected. On March 28, 1997, the NRC officially endorsed taking over the responsibility for regulatory oversight of DOE nuclear facilities as the DOE had proposed, contingent upon adequate funding, staffing resources, and a clear delineation of NRC authority. This article first contrasts the ways in which the NRC and the DOE carry out their basic regulatory functions. Next, it describes the NRC's current authority over DOE facilities and the status of the DOE's initiative to expand that authority. Then, it discusses the basic changes and impacts that can be expected in the regulation of DOE facilities. The article next describes key lessons learned from the recent transition of the GDPs from DOE oversight to NRC regulation and the major regulatory issues that arose in that transition. Finally, some general strategies are suggested for resolving issues likely to arise as the NRC assumes regulatory authority over DOE facilities

  8. 76 FR 76192 - NRC Enforcement Policy

    Science.gov (United States)

    2011-12-06

    ... NUCLEAR REGULATORY COMMISSION [NRC-2011-0273] NRC Enforcement Policy AGENCY: Nuclear Regulatory Commission. ACTION: Proposed enforcement policy revision; request for comment. SUMMARY: The U.S. Nuclear... licensees, vendors, and contractors), on proposed revisions to the NRC's Enforcement Policy (the Policy) and...

  9. Drinking Water Research Division's research activities in support of EPA's regulatory agenda

    International Nuclear Information System (INIS)

    Clark, R.M.; Feige, W.A.

    1991-01-01

    The Safe Drinking Water Act and its Amendments will have a dramatic impact on the way in which one views the treatment and distribution of water in the U.S. The paper discusses the regulatory agenda, including proposed and promulgated regulations for volatile and synthetic organic contaminants, pesticides, lead, copper, inorganic contaminants, and radionuclides. In addition, the Surface Water Treatment and Coliform Rules are discussed in some detail. Tables are presented that list the Maximum Contaminant Levels (MCLs) and Maximum Contaminant Level Goals (MCLGs), as well as Best Available Technology (BAT) for reducing many of these contaminants to acceptable levels. Finally, a discussion of expected disinfection requirements and the regulation of disinfection by-products (DBP) is made. Treatment techniques for controlling DBPs are briefly described

  10. 78 FR 5838 - NRC Enforcement Policy

    Science.gov (United States)

    2013-01-28

    ... NUCLEAR REGULATORY COMMISSION [NRC-2013-0014] NRC Enforcement Policy AGENCY: Nuclear Regulatory Commission. ACTION: Policy revision; issuance and request for comments. SUMMARY: The U.S. Nuclear Regulatory... Nuclear Regulatory Commission Enforcement Policy,'' December 30, 2009 (ADAMS Accession No. ML093200520);(2...

  11. NRC closing remarks

    International Nuclear Information System (INIS)

    Coffman, F.

    1994-01-01

    This section contains the edited transcript of the NRC closing remarks made by Mr. Franklin Coffman (Chief, Human Factors Branch, Office of Nuclear Regulatory Research) and Dr. Cecil Thomas (Deputy Director, Division of Reactor Controls and Human Factors, Office of Nuclear Reactor Regulation). This editing consisted of minimal editing to correct grammar and remove extraneous references to microphone volume, etc

  12. 76 FR 39991 - Introduction to the Unified Agenda of Federal Regulatory and Deregulatory Actions

    Science.gov (United States)

    2011-07-07

    .... Abbreviations VI. How Can Users Get Copies of the Plan and the Agenda? Agency Agendas Cabinet Departments...://reginfo.gov . The online Unified Agenda offers flexible search tools and will soon offer access to the... Government Ethics Office of Management and Budget Office of Personnel Management Peace Corps Pension Benefit...

  13. Introduction to the Unified Agenda of Federal Regulatory and Deregulatory Actions

    Science.gov (United States)

    2010-04-26

    ... Regulatory Commission Federal Housing Finance Agency Federal Maritime Commission Federal Mediation and... that the Regulatory Flexibility Act may require a Regulatory Flexibility Analysis, actions selected for.... Regulatory Flexibility Analysis Required -- whether an analysis is required by the Regulatory Flexibility Act...

  14. Impacts of NRC programs on state and local governments

    International Nuclear Information System (INIS)

    Nussbaumer, D.A.; Lubenau, J.O.

    1983-12-01

    This document reports the results of an NRC staff examination of the impacts of NRC regulatory programs on State and local governments. Twenty NRC programs are identified. For each, the source of the program (e.g., statutory requirement) and NRC funding availability are described and the impacts upon State and local governments are assessed. Recommendations for NRC monitoring and assessing impacts and for enhancing NRC staff awareness of the impacts are offered

  15. NRC overview: Repository QA

    International Nuclear Information System (INIS)

    Kennedy, J.E.

    1988-01-01

    The US Department of Energy (DOE) is on the threshold of an extensive program for characterizing Yucca Mountain in Nevada to determine if it is a suitable site for the permanent disposal of high-level nuclear waste. Earlier this year, the DOE published the Consultation Draft Site Characterization Plan for the Nevada site, which describes in some detail the studies that need to be performed to determine if the site is acceptable. In the near future, the final site characterization plan (SCP) is expected to be issued and large-scale site characterization activities to begin. The data and analyses that will result from the execution of that plan are expected to be the primary basis for the license application to the US Nuclear Regulatory Commission (NRC). Because of the importance of these data and analyses in the assessment of the suitability of the site and in the demonstration of that suitability in the NRC licensing process, the NRC requires in 10CFR60 that site characterization be performed under a quality assurance (QA) program. The QA program is designed to provide confidence that data are valid, retrievable, and reproducible. The documentation produced by the program will form an important part of the record on which the suitability of the site is judged in licensing. In addition, because the NRC staff can review only a selected portion of the data collected, the staff will need to rely on the system of controls in the DOE QA program

  16. ARTIST (Asian regional tobacco industry scientist team): Philip Morris' attempt to exert a scientific and regulatory agenda on Asia.

    Science.gov (United States)

    Tong, E K; Glantz, S A

    2004-12-01

    To describe how the transnational tobacco industry has collaborated with local Asian tobacco monopolies and companies to promote a scientific and regulatory agenda. Analysis of previously secret tobacco industry documents. Transnational tobacco companies began aggressively entering the Asia market in the 1980s, and the current tobacco industry in Asia is a mix of transnational and local monopolies or private companies. Tobacco industry documents demonstrate that, in 1996, Philip Morris led an organisation of scientific representatives from different tobacco companies called the Asian Regional Tobacco Industry Science Team (ARTIST), whose membership grew to include monopolies from Korea, China, Thailand, and Taiwan and a company from Indonesia. ARTIST was initially a vehicle for PM's strategies against anticipated calls for global smoke-free areas from a World Health Organization secondhand smoke study. ARTIST evolved through 2001 into a forum to present scientific and regulatory issues faced primarily by Philip Morris and other transnational tobacco companies. Philip Morris' goal for the organisation became to reach the external scientific and public health community and regulators in Asia. The Asian tobacco industry has changed from an environment of invasion by transnational tobacco companies to an environment of participation with Philip Morris' initiated activities. With this participation, tobacco control efforts in Asia face new challenges as Philip Morris promotes and integrates its scientific and regulatory agenda into the local Asian tobacco industry. As the local Asian tobacco monopolies and companies can have direct links with their governments, future implementation of effective tobacco control may be at odds with national priorities.

  17. NRC performance assessment program

    International Nuclear Information System (INIS)

    Coplan, S.M.

    1986-01-01

    The U.S. Nuclear Regulatory Commission's (NRC) performance assessment program includes the development of guidance to the U.S. Department of Energy (DOE) on preparation of a license application and on conducting the studies to support a license application. The nature of the licensing requirements of 10 CFR Part 60 create a need for performance assessments by the DOE. The NRC and DOE staffs each have specific roles in assuring the adequacy of those assessments. Performance allocation is an approach for determining what testing and analysis will be needed during site characterization to assure that an adequate data base is available to support the necessary performance assessments. From the standpoint of establishing is implementable methodology, the most challenging performance assessment needed for licensing is the one that will be used to determine compliance with the U.S. Environmental Protection Agency's (EPA) containment requirement

  18. Regulatory perspectives on model validation in high-level radioactive waste management programs: A joint NRC/SKI white paper

    Energy Technology Data Exchange (ETDEWEB)

    Wingefors, S.; Andersson, J.; Norrby, S. [Swedish Nuclear Power lnspectorate, Stockholm (Sweden). Office of Nuclear Waste Safety; Eisenberg, N.A.; Lee, M.P.; Federline, M.V. [U.S. Nuclear Regulatory Commission, Washington, DC (United States). Office of Nuclear Material Safety and Safeguards; Sagar, B.; Wittmeyer, G.W. [Center for Nuclear Waste Regulatory Analyses, San Antonio, TX (United States)

    1999-03-01

    Validation (or confidence building) should be an important aspect of the regulatory uses of mathematical models in the safety assessments of geologic repositories for the disposal of spent nuclear fuel and other high-level radioactive wastes (HLW). A substantial body of literature exists indicating the manner in which scientific validation of models is usually pursued. Because models for a geologic repository performance assessment cannot be tested over the spatial scales of interest and long time periods for which the models will make estimates of performance, the usual avenue for model validation- that is, comparison of model estimates with actual data at the space-time scales of interest- is precluded. Further complicating the model validation process in HLW programs are the uncertainties inherent in describing the geologic complexities of potential disposal sites, and their interactions with the engineered system, with a limited set of generally imprecise data, making it difficult to discriminate between model discrepancy and inadequacy of input data. A successful strategy for model validation, therefore, should attempt to recognize these difficulties, address their resolution, and document the resolution in a careful manner. The end result of validation efforts should be a documented enhancement of confidence in the model to an extent that the model's results can aid in regulatory decision-making. The level of validation needed should be determined by the intended uses of these models, rather than by the ideal of validation of a scientific theory. This white Paper presents a model validation strategy that can be implemented in a regulatory environment. It was prepared jointly by staff members of the U.S. Nuclear Regulatory Commission and the Swedish Nuclear Power Inspectorate-SKI. This document should not be viewed as, and is not intended to be formal guidance or as a staff position on this matter. Rather, based on a review of the literature and previous

  19. Regulatory perspectives on model validation in high-level radioactive waste management programs: A joint NRC/SKI white paper

    International Nuclear Information System (INIS)

    Wingefors, S.; Andersson, J.; Norrby, S.

    1999-03-01

    Validation (or confidence building) should be an important aspect of the regulatory uses of mathematical models in the safety assessments of geologic repositories for the disposal of spent nuclear fuel and other high-level radioactive wastes (HLW). A substantial body of literature exists indicating the manner in which scientific validation of models is usually pursued. Because models for a geologic repository performance assessment cannot be tested over the spatial scales of interest and long time periods for which the models will make estimates of performance, the usual avenue for model validation- that is, comparison of model estimates with actual data at the space-time scales of interest- is precluded. Further complicating the model validation process in HLW programs are the uncertainties inherent in describing the geologic complexities of potential disposal sites, and their interactions with the engineered system, with a limited set of generally imprecise data, making it difficult to discriminate between model discrepancy and inadequacy of input data. A successful strategy for model validation, therefore, should attempt to recognize these difficulties, address their resolution, and document the resolution in a careful manner. The end result of validation efforts should be a documented enhancement of confidence in the model to an extent that the model's results can aid in regulatory decision-making. The level of validation needed should be determined by the intended uses of these models, rather than by the ideal of validation of a scientific theory. This white Paper presents a model validation strategy that can be implemented in a regulatory environment. It was prepared jointly by staff members of the U.S. Nuclear Regulatory Commission and the Swedish Nuclear Power Inspectorate-SKI. This document should not be viewed as, and is not intended to be formal guidance or as a staff position on this matter. Rather, based on a review of the literature and previous

  20. NRC's license renewal regulations

    International Nuclear Information System (INIS)

    Akstulewicz, Francis

    1991-01-01

    In order to provide for the continuity of the current generation of nuclear power plant operating licenses and at the same time ensure the health and safety of the public, and the quality of the environment, the US Nuclear Regulatory Commission (NRC) established a goal of developing and issuing regulations and regulatory guidance for license renewal in the early 1990s. This paper will discuss some of those activities underway to achieve this goal. More specifically, this paper will discuss the Commission's regulatory philosophy for license renewal and the two major license renewal rule makings currently underway. The first is the development of a new Part 54 to address procedural and technical requirements for license renewal; the second is a revision to existing Part 51 to exclude environmental issues and impacts from consideration during the license renewal process. (author)

  1. IT Legislative and Regulatory Issues Agenda. Higher Education Information Technology Alliance

    Science.gov (United States)

    National Association of State Universities and Land-Grant Colleges, 2004

    2004-01-01

    This document represents the higher education and library community's guiding public policy agenda on information technology (IT) for the current year. The Higher Education Information Technology (HEIT) Alliance is a coalition of 11 national higher education and library associations, whose members represent a broad array of stakeholders on college…

  2. NRC nuclear waste geochemistry 1983

    International Nuclear Information System (INIS)

    Alexander, D.H.; Birchard, G.F.

    1984-05-01

    The purpose of the meeting was to present results from NRC-sponsored research and to identify regulatory research issues which need to be addressed prior to licensing a high-level waste repository. Important summaries of technical issues and recommendations are included with each paper. The issue reflect areas of technical uncertainty addressed by the NRC Research program in geochemistry. The objectives of the NRC Research Program in geochemistry are to provide a technical basis for waste management rulemaking, to provide the NRC Waste Management Licensing Office with information that can be used to support sound licensing decisions, and to identify investigations that need to be conducted by DOE to support a license application. Individual papers were processed for inclusion in the Energy Data Base

  3. 78 FR 44193 - Introduction to the Unified Agenda of Federal Regulatory and Deregulatory Actions

    Science.gov (United States)

    2013-07-23

    ... the United States Federal Mediation and Conciliation Service Financial Stability Oversight Council... Flexibility Analysis, actions selected for periodic review under section 610(c) of the Regulatory Flexibility... know what action it will take next. Regulatory Flexibility Analysis Required--whether an analysis is...

  4. 78 FR 44237 - Improving Government Regulations; Unified Agenda of Federal Regulatory and Deregulatory Actions

    Science.gov (United States)

    2013-07-23

    ... Federal Regulatory and Deregulatory Actions is composed of the regulatory status reports, including... Ownership of Offeror 0750-AH58 (DFARS Case 2011-D044). 120 Release of Fundamental 0750-AH92 Research... (DFARS Case 2009-D031). 122 Proposal Adequacy 0750-AH47 Checklist (DFARS Case 2011-D042). Office of...

  5. NRC perspectives on fuel cycle and safeguards

    International Nuclear Information System (INIS)

    Chapman, K.R.

    1976-01-01

    This paper discusses NRC's mandate in the field of safeguards and the thoughts of NRC on other newly emerging policy considerations. The status of some of the current issues facing the nuclear community and the regulatory staff in particular is touched on

  6. NRC antitrust licensing actions, 1978--1996

    International Nuclear Information System (INIS)

    Mayer, S.J.; Simpson, J.J.

    1997-09-01

    NUREG-0447, Antitrust Review of Nuclear Power Plants, was published in May 1978 and includes a compilation and discussion of U.S. Nuclear Regulatory Commission (NRC) proceedings and activity involving the NRC's competitive review program through February 1978, NUREG-0447 is an update of an earlier discussion of the NRC's antitrust review of nuclear power plants, NR-AIG-001, The US Nuclear Regulatory Commission's Antitrust Review of Nuclear Power Plants: The Conditioning of Licenses, which reviewed the Commission's antitrust review function from its inception in December 1970 through April 1976. This report summarizes the support provided to NRC staff in updating the compilation of the NRC's antitrust licensing review activities for commercial nuclear power plants that have occurred since February 1978. 4 refs., 4 tabs

  7. NRC antitrust licensing actions, 1978--1996

    Energy Technology Data Exchange (ETDEWEB)

    Mayer, S.J.; Simpson, J.J.

    1997-09-01

    NUREG-0447, Antitrust Review of Nuclear Power Plants, was published in May 1978 and includes a compilation and discussion of U.S. Nuclear Regulatory Commission (NRC) proceedings and activity involving the NRC`s competitive review program through February 1978, NUREG-0447 is an update of an earlier discussion of the NRC`s antitrust review of nuclear power plants, NR-AIG-001, The US Nuclear Regulatory Commission`s Antitrust Review of Nuclear Power Plants: The Conditioning of Licenses, which reviewed the Commission`s antitrust review function from its inception in December 1970 through April 1976. This report summarizes the support provided to NRC staff in updating the compilation of the NRC`s antitrust licensing review activities for commercial nuclear power plants that have occurred since February 1978. 4 refs., 4 tabs.

  8. 77 FR 7960 - Unified Agenda of Federal Regulatory and Deregulatory Actions

    Science.gov (United States)

    2012-02-13

    ... Sequence No. Title Identifier No. 377 Claims Procedures Under 1625-AA03 the Oil Pollution Act of 1990 (USCG... Regulatory Flexibility Analysis Required: Yes. Agency Contact: Jeremy F. Olson, Senior Procurement Analyst... Procedures Under the Oil Pollution Act of 1990 (USCG-2004- 17697) Legal Authority: 33 U.S.C. 2713 and 2714...

  9. 75 FR 21723 - Introduction to the Unified Agenda of Federal Regulatory and Deregulatory Actions

    Science.gov (United States)

    2010-04-26

    ... Commission National Science Foundation Office of Government Ethics Office of Management and Budget Office of Personnel Management Peace Corps Pension Benefit Guaranty Corporation Postal Regulatory Commission Railroad... individual data fields. To see a listing of all of an agency's entries, a user can select the agency without...

  10. 77 FR 7940 - Unified Agenda of Federal Regulatory and Deregulatory Actions

    Science.gov (United States)

    2012-02-13

    ... and benefits of the action. An indication of whether the planned action is likely to have significant... with ED's Principles for Regulating listed in its regulatory plan, ED is committed to regulations that... necessary and then in the most flexible, most equitable, least burdensome way possible. Interested members...

  11. NRC performance indicator program

    International Nuclear Information System (INIS)

    Singh, R.N.

    1987-01-01

    The performance indicator development work of the US Nuclear Regulatory Commission (NRC) interoffice task group involved several major activities that included selection of candidate indicators for a trial program, data collection and review, validation of the trial indicators, display method development, interactions with the industry, and selection of an optimum set of indicators for the program. After evaluating 27 potential indicators against certain ideal attributes, the task group selected 17 for the trial program. The pertinent data for these indicators were then collected from 50 plants at 30 sites. The validation of the indicators consisted of two primary processes: logical validity and statistical analysis. The six indicators currently in the program are scrams, safety system actuations, significant events, safety system failures, forced outage rate, and equipment forced outages per 100 critical hours. A report containing data on the six performance indicators and some supplemental information is issued on a quarterly basis. The NRC staff is also working on refinements of existing indicators and development of additional indicators as directed by the commission

  12. NRC quarterly [status] report

    International Nuclear Information System (INIS)

    1987-01-01

    This report covers the third quarter of calendar year 1987. The NRC licensing activity during the period of this report included the issuance of a full-power license for Beaver Valley 2 on August 14, 1987, and operating license restricted to five percent power for South Texas Unit 1 on August 21, 1987. Additional licensing delay for Shoreham is projected due to complex litigation. Also, licensing delay may occur for Comanche Peak Unit 1, because the duration of the hearing is uncertain. Although a license authorizing fuel loading and precriticality testing for Seabrook Unit 1 has been issued, there is a projected delay for low-power licensing. Full-power licensing for Seabrook Unit 1 will be delayed due to offsite emergency preparedness issues. The length of the delay is not known at this time. With the exception of Seabrook and Shoreham, regulatory delays in this report are not impacted by the schedules for resolving off-site emergency preparedness issues

  13. The NRC perspective on low-level radioactive waste disposal

    International Nuclear Information System (INIS)

    Thompson, H.L. Jr.; Knapp, M.R.

    1987-01-01

    This paper describes the Nuclear Regulatory Commission's (NRC) actions in response to the Low-Level Radioactive Waste Policy Amendments Act (the Act) and NRC's assistance to States and Compacts working to discharge their responsibilities under the Act. Three of NRC's accomplishments which respond explicitly to direction in the Act are highlighted. These are: development of the capability of expedited handling of petitions addressing wastes below regulatory concern (BRC); development of capability to review and process an application within fifteen months; and development of guidance on alternatives to shallow land burial. Certain NRC efforts concerning special topics related to the Act as well as NRC efforts to assist States and Compacts are summarized

  14. NRC - regulator of nuclear safety

    International Nuclear Information System (INIS)

    1997-01-01

    The U.S. Nuclear Regulatory Commission (NRC) was formed in 1975 to regulate the various commercial and institutional uses of nuclear energy, including nuclear power plants. The agency succeeded the Atomic Energy Commission, which previously had responsibility for both developing and regulating nuclear activities. Federal research and development work for all energy sources, as well as nuclear weapons production, is now conducted by the U.S. Department of Energy. Under its responsibility to protect public health and safety, the NRC has three principal regulatory functions: (1) establish standards and regulations, (2) issue licenses for nuclear facilities and users of nuclear materials, and (3) inspect facilities and users of nuclear materials to ensure compliance with the requirements. These regulatory functions relate to both nuclear power plants and to other uses of nuclear materials - like nuclear medicine programs at hospitals, academic activities at educational institutions, research work, and such industrial applications as gauges and testing equipment. The NRC places a high priority on keeping the public informed of its work. The agency recognizes the interest of citizens in what it does through such activities as maintaining public document rooms across the country and holding public hearings, public meetings in local areas, and discussions with individuals and organizations

  15. NRC/RSR Data Bank Program description

    International Nuclear Information System (INIS)

    Bankert, S.F.

    1979-01-01

    The United States Nuclear Regulatory Commission (NRC) has established the NRC/Reactor Safety Research (RSR) Data Bank Program to collect, store, and make available data from the many domestic and foreign water reactor safety research programs. Local direction of the program is provided by EG and G Idaho, Inc., at Idaho National Engineering Laboratory. The NRC/RSR Data Bank Program provides a central computer storage mechanism and access software for data to be used by code development and assessment groups in meeting the code and correlation needs of the nuclear industry. The administrative portion of the program provides data entry, documentation, and training and advisory services to users and the NRC. The NRC/RSR Data Bank Program and the capabilities of the data access software are described

  16. NRC methods for evaluation of industry training

    International Nuclear Information System (INIS)

    Morisseau, D.S.; Koontz, J.L.; Persensky, J.J.

    1987-01-01

    On March 20, 1985, the Nuclear Regulatory Commission published the Policy Statement on Training and Qualification. The Policy Statement endorsed the INPO-managed Training Accreditation Program because it encompasses the five elements of performance-based training. This paper described the multiple methods that the NRC is using to monitor industry efforts to improve training and implement the NRC Policy Statement on Training and Qualification. The results of the evaluation of industry training improvement programs will be reviewed by the Commissioners in April 1987 to determine the nature of continuing NRC policy and programs for ensuring effective training for the US nuclear industry

  17. Public citizen slams NRC on nuclear inspections

    International Nuclear Information System (INIS)

    Newman, P.

    1993-01-01

    Charging the Nuclear Regulatory Commission with open-quotes abandoning tough regulation of the nuclear power industry,close quotes Public Citizen's Critical Mass Energy Project on Wednesday released a report asserting that NRC is shielding sensitive internal nuclear industry self-evaluations from public scrutiny. Based on their review of 56 Institute of Nuclear Power Operations reports and evaluations and comparing these to the NRC's Systematic Assessment of Licensee Performance reports for the same plants, it was concluded that the NRC failed to address issues raised in all eight areas evaluated by the INPO reports

  18. NRC's object-oriented simulator instructor station

    International Nuclear Information System (INIS)

    Griffin, J.I.; Griffin, J.P.

    1995-06-01

    As part of a comprehensive simulator upgrade program, the simulator computer systems associated with the Nuclear Regulatory Commission's (NRC) nuclear power plant simulators were replaced. Because the original instructor stations for two of the simulators were dependent on the original computer equipment, it was necessary to develop and implement new instructor stations. This report describes the Macintosh-based Instructor Stations developed by NRC engineers for the General Electric (GE) and Babcock and Wilcox (B and W) simulators

  19. 75 FR 22868 - Withdrawal of Regulatory Guide

    Science.gov (United States)

    2010-04-30

    ...'s public Web site under ``Regulatory Guides'' in the NRC's Electronic Reading Room at http://www.nrc.gov/reading-rm/doc-collections . Regulatory guides are also available for inspection at the NRC's... NUCLEAR REGULATORY COMMISSION [NRC-2010-0167] Withdrawal of Regulatory Guide AGENCY: Nuclear...

  20. Selection of a discount rate for use in NRC regulatory analyses and application of discount rates to future averted health effects

    International Nuclear Information System (INIS)

    Paananen, O.H.; Hendrickson, P.L.

    1993-01-01

    The principal objective of this report is to provide background information and recommendations on the use of discount rates in the regulatory analysis process. The report focuses on two issues selecting the appropriate discount rate or rates to use when conducting a regulatory analysis, and applying the selected discount rate to future health-related benefits estimated to result from alternative regulatory actions

  1. The NRC measurement verification program

    International Nuclear Information System (INIS)

    Pham, T.N.; Ong, L.D.Y.

    1995-01-01

    A perspective is presented on the US Nuclear Regulatory Commission (NRC) approach for effectively monitoring the measurement methods and directly testing the capability and performance of licensee measurement systems. A main objective in material control and accounting (MC and A) inspection activities is to assure the accuracy and precision of the accounting system and the absence of potential process anomalies through overall accountability. The primary means of verification remains the NRC random sampling during routine safeguards inspections. This involves the independent testing of licensee measurement performance with statistical sampling plans for physical inventories, item control, and auditing. A prospective cost-effective alternative overcheck is also discussed in terms of an externally coordinated sample exchange or ''round robin'' program among participating fuel cycle facilities in order to verify the quality of measurement systems, i.e., to assure that analytical measurement results are free of bias

  2. Overview of NRC PRA research program

    International Nuclear Information System (INIS)

    Cunningham, M.A.; Drouin, M.T.; Ramey-Smith, A.M.; VanderMolen, M.T.

    1997-01-01

    The NRC's research program in probabilistic risk analysis includes a set of closely-related elements, from basic research to regulatory applications. The elements of this program are as follows: (1) Development and demonstration of methods and advanced models and tools for use by the NRC staff and others performing risk assessments; (2) Support to agency staff on risk analysis and statistics issues; (3) Reviews of risk assessments submitted by licensees in support of regulatory applications, including the IPEs and IPEEEs. Each of these elements is discussed in the paper, providing highlights of work within an element, and, where appropriate, describing important support and feedback mechanisms among elements

  3. 76 FR 57767 - Proposed Generic Communication; Draft NRC Generic Letter 2011-XX: Seismic Risk Evaluations for...

    Science.gov (United States)

    2011-09-16

    ... NUCLEAR REGULATORY COMMISSION [NRC-2011-0204] Proposed Generic Communication; Draft NRC Generic Letter 2011-XX: Seismic Risk Evaluations for Operating Reactors AGENCY: Nuclear Regulatory Commission... FR 54507), that requested public comment on Draft NRC Generic Letter 2011- XX: Seismic Risk...

  4. 1996 NRC annual report. Volume 13

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-01

    This 22nd annual report of the US Nuclear Regulatory Commission (NRC) describes accomplishments, activities, and plans made during Fiscal Year 1996 (FH 1996)--October 1, 1995, through September 30, 1996. Significant activities that occurred early in FY 1997 are also described, particularly changes in the Commission and organization of the NRC. The mission of the NRC is to ensure that civilian uses of nuclear materials in the US are carried out with adequate protection of public health and safety, the environment, and national security. These uses include the operation of nuclear power plants and fuel cycle plants and medical, industrial, and research applications. Additionally, the NRC contributes to combating the proliferation of nuclear weapons material worldwide. The NRC licenses and regulates commercial nuclear reactor operations and research reactors and other activities involving the possession and use of nuclear materials and wastes. It also protects nuclear materials used in operation and facilities from theft or sabotage. To accomplish its statutorily mandated regulatory mission, the NRC issues rules and standards, inspects facilities and operations, and issues any required enforcement actions.

  5. 1996 NRC annual report. Volume 13

    International Nuclear Information System (INIS)

    1997-01-01

    This 22nd annual report of the US Nuclear Regulatory Commission (NRC) describes accomplishments, activities, and plans made during Fiscal Year 1996 (FH 1996)--October 1, 1995, through September 30, 1996. Significant activities that occurred early in FY 1997 are also described, particularly changes in the Commission and organization of the NRC. The mission of the NRC is to ensure that civilian uses of nuclear materials in the US are carried out with adequate protection of public health and safety, the environment, and national security. These uses include the operation of nuclear power plants and fuel cycle plants and medical, industrial, and research applications. Additionally, the NRC contributes to combating the proliferation of nuclear weapons material worldwide. The NRC licenses and regulates commercial nuclear reactor operations and research reactors and other activities involving the possession and use of nuclear materials and wastes. It also protects nuclear materials used in operation and facilities from theft or sabotage. To accomplish its statutorily mandated regulatory mission, the NRC issues rules and standards, inspects facilities and operations, and issues any required enforcement actions

  6. Validation of seismic soil-structure interaction analysis methods: EPRI [Electric Power Research Institute]/NRC [Nuclear Regulatory Commission] cooperation in Lotung, Taiwan, experiments

    International Nuclear Information System (INIS)

    Kot, C.A.; Srinivasan, M.G.; Hsieh, B.J.; Tang, Y.K.; Kassawara, R.P.

    1986-01-01

    The cooperative program between NRC/ANL and EPRI on the validation of soil-structure interaction analysis methods with actual seismic response data is described. A large scale-model of a containment building has been built by EPRI/Taipower in a highly seismic region of Taiwan. Vibration tests were performed, first on the basemat before the superstructure was built and then on the completed structure. Since its completion, the structure has experienced many earthquakes. The site and structural response to these earthquakes have been recorded with field (surface and downhole) and structural instrumentation. The validation program involves blind predictions of site and structural response during vibration tests and a selected seismic event, and subsequent comparison between the predictions and measurements. The predictive calculations are in progress. The results of the correlation are expected to lead to the evaluation of the methods as to their conservatisms and sensitivities

  7. NRC concerns about steam generator tube U-bend failures

    International Nuclear Information System (INIS)

    Dillon, R.L.

    1981-01-01

    This paper concerns itself with genralized NRC regulatory policy regarding SGT failures and staff reports and opinions which may tend to influence the developing policy specific to U-bend failures. The most significant analysis at hand in predicting NRC policy on SGT U-bend failures is Marsh's Evaluation of Steam Generator Tube Rupture Events. Marsh sets out to describe and analyze the five steam generator tube ruptures that are known to NRC. All have occurred in the period 1975 to 1980

  8. NRC plan for cleanup operations at Three Mile Island Unit 2

    International Nuclear Information System (INIS)

    Lo, R.; Snyder, B.J.

    1980-07-01

    The NRC plan defines the functional role of the NRC in cleanup operations at Three Mile Island Unit 2 to assure that agency regulatory responsibilities and objectives will be fulfilled. The plan outlines NRC functions in TMI-2 cleanup operations in the following areas: (1) the functional relationship of NRC to other government agencies, the public, and the licensee to coordinate activities, (2) the functional roles of these organizations in cleanup operations, (3) the NRC review and decision-making procedure for the licensee's proposed cleanup operation, (4) the NRC/licensee estimated schedule of major actions, and (5) NRC's functional role in overseeing implementation of approved licensee activities

  9. Abstracts: NRC Waste Management Program reports

    Energy Technology Data Exchange (ETDEWEB)

    Heckman, R.A.; Minichino, C.

    1979-11-01

    This document consists of abstracts of all reports published by the Nuclear Regulatory Commission (NRC) Waste Management Program at Lawrence Livermore Laboratory (LLL). It will be updated at regular intervals. Reports are arranged in numerical order, within each category. Unless otherwise specified, authors are LLL scientists and engineers.

  10. Abstracts: NRC Waste Management Program reports

    International Nuclear Information System (INIS)

    Heckman, R.A.; Minichino, C.

    1979-11-01

    This document consists of abstracts of all reports published by the Nuclear Regulatory Commission (NRC) Waste Management Program at Lawrence Livermore Laboratory (LLL). It will be updated at regular intervals. Reports are arranged in numerical order, within each category. Unless otherwise specified, authors are LLL scientists and engineers

  11. The NRC and utility finances

    International Nuclear Information System (INIS)

    Byus, L.C.

    1992-01-01

    In a speech before the National Association of Regulatory Utility Commissioners in November 1991, Nuclear Regulatory Commission Chairman Ivan Selin presented what he called an open-quotes expansion of the concept of safety beyond our previous narrow bounds.close quotes He went on to explain, open-quotes To be seen as successful and safe operators of nuclear facilities, utilities must have safe and predictable cash flows.close quotes While there is little disagreement that the concepts of successful plant operations and financial strength go hand in hand, the relationship between the two is not clear. Which came first, successful operation of generating plants or financial strength? Selin's views on NRC involvement in financial aspects of utility operation in the United States are sure to stimulate debate on the issue

  12. Nuclear regulation. NRC's security clearance program can be strengthened

    International Nuclear Information System (INIS)

    Fultz, Keith O.; Kruslicky, Mary Ann; Bagnulo, John E.

    1988-12-01

    Because of the national security implications of its programs, the Nuclear Regulatory Commission (NRC) investigates the background of its employees and consultants as well as others to ensure that they are reliable and trustworthy. If the investigation indicates that an employee will not endanger national security, NRC grants a security clearance that allows access to classified information, material, and facilities. NRC also requires periodic checks for some clearance holders to ensure their continued clearance eligibility. The Chairman, Subcommittee on Environment, Energy, and Natural Resources, House Committee on Government Operations, asked GAO to review NRC's personnel security clearance program and assess the procedures that NRC uses to ensure that those who operate nuclear power plants do not pose a threat to the public. The Atomic Energy Act of 1954 requires NRC to conduct background investigations of its employees and consultants as well as others who have access to classified information, material, or facilities. To do this, NRC established a personnel security clearance program. Under NRC policies, a security clearance is granted after the Office of Personnel Management (OPM) or the Federal Bureau of Investigation checks the background of those applying for an NRC clearance. NRC also periodically reassesses the integrity of those holding the highest level clearance. NRC employees, consultants, contractors, and licensees as well as other federal employees hold approximately 10,600 NRC clearances. NRC does not grant clearances to commercial nuclear utility employees unless they require access to classified information or special nuclear material. However, the utilities have voluntarily established screening programs to ensure that their employees do not pose a threat to nuclear plants. NRC faces a dilemma when it hires new employees. Although its policy calls for new hires to be cleared before they start work, the security clearance process takes so long

  13. 75 FR 2894 - Withdrawal of Regulatory Guide 1.148

    Science.gov (United States)

    2010-01-19

    ... downloading through the NRC's public Web site under ``Regulatory Guides'' in the NRC's Electronic Reading Room at http://www.nrc.gov/reading-rm/doc-collections . Regulatory guides are also available for... NUCLEAR REGULATORY COMMISSION [NRC-2010-0013] Withdrawal of Regulatory Guide 1.148 AGENCY: Nuclear...

  14. 75 FR 70044 - Withdrawal of Regulatory Guide 1.39

    Science.gov (United States)

    2010-11-16

    ... downloading through the NRC's public Web site under ``Regulatory Guides'' in the NRC's Electronic Reading Room at http://www.nrc.gov/reading-rm/doollectionsc-c . Regulatory guides are also available for... NUCLEAR REGULATORY COMMISSION [NRC-2010-0354] Withdrawal of Regulatory Guide 1.39 AGENCY: Nuclear...

  15. 48 CFR 2009.570 - NRC organizational conflicts of interest.

    Science.gov (United States)

    2010-10-01

    ... conflicts of interest. 2009.570 Section 2009.570 Federal Acquisition Regulations System NUCLEAR REGULATORY COMMISSION COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational Conflicts of Interest 2009.570 NRC organizational conflicts of interest. ...

  16. NRC/RSR Data Bank Program

    International Nuclear Information System (INIS)

    Bankert, S.F.; Evans, C.D.; Hardy, H.A.; Litteer, G.L.; Schulz, G.L.; Smith, N.C.

    1978-01-01

    The United States Nuclear Regulatory Commission (NRC) has established the NRC/Reactor Safety Research (RSR) Data Bank Program at the Idaho National Engineering Laboratory (INEL). The program provides the means of collecting, storing, and making available experimental data from the many water reactor safety research programs in the United States and other countries. The program collects qualified engineering data on a prioritized basis from experimental program data bases, stores the data in a single data bank in a common format, and makes the data available to users

  17. NRC program of inspection and enforcement

    International Nuclear Information System (INIS)

    LeDoux, J.C.; Rehfuss, C.

    1978-01-01

    The Nuclear Regulatory Commission (NRC) regulates civilian uses of nuclear materials to ensure the protection of the public health and safety and the environment. The Office of Inspection and Enforcement (IE) develops and implements the inspection, investigation, and enforcement programs for the NRC. The IE conducts inspection programs for reactors under construction and in operation, nuclear industry vendors, fuel facilities and users of nuclear materials, and all aspects of the safeguarding of facilities and materials. Recently the IE began implementing a program that will place inspectors on site at nuclear power reactors and will provide for national appraisal of licensee performance and for an evaluation of the effectiveness of the inspection programs

  18. Conflicts and misapplications of ANSI N509, N510, U.S. NRC Regulatory Guide 1.52 and 1.140

    International Nuclear Information System (INIS)

    Kovach, J.L.

    1987-01-01

    The nuclear industry in the early 1970's attempted to standardize air cleaning system design and testing by the development of ANSI N509, Nuclear Power Air Cleaning Units and Components and ANSI N510, Testing of Nuclear Air Cleaning Systems. Parallel to those and leaning somewhat on the same information, the USNRC has prepared first, Regulatory Guide 1.52, Design, Testing, and Maintenance Criteria for Atmosphere Clean Up of System Air Filtration and Adsorption Units of Light Water Cooled Nuclear Reactor plants, and regulatory guide 1.140, Design, Testing, and Maintenance Criteria for Normal Ventilation Exhaust System Air Filtration and Adsorption Units of Light Water Cooled Nuclear Power Plants. These documents were a good starting point and should have been the basis for the evolution of sound engineering practices. Instead of that path, the subsequent revisions were narrow in scope, uncoordinated, rarely based on experience and became nearly unworkable. Starting with the scope statement (or equivalent for the regulatory guides) the problems began to occur. Ten recommendations are made for eliminating the troublesome aspects of the regulations

  19. Reassessment of the NRC's program for protecting allegers against retaliation

    International Nuclear Information System (INIS)

    1994-01-01

    On July 6, 1993, the Nuclear Regulatory Commission's (NRC's) Executive Director for Operations established a review team to reassess the NRC's program for protecting allegers against retaliation. The team evaluated the current system, and solicited comments from various NRC offices, other Federal agencies, licensees, former allegers, and the public. This report is subject to agency review. The report summarizes current processes and gives an overview of current problems. It discusses: (1) ways in which licensees can promote a quality-conscious work environment, in which all employees feel free to raise concerns without fear of retaliation; (2) ways to improve the NRC's overall handling of allegations; (3) the NRC's involvement in the Department of Labor process; (4) related NRC enforcement practices; and (5) methods other than investigation and enforcement that may be useful in treating allegations of potential or actual discrimination. Recommendations are given in each area

  20. NRC/RSR Data Bank Program

    International Nuclear Information System (INIS)

    Bankert, S.F.; Evans, C.D.; Hardy, H.A.; Litteer, G.L.; Schulz, G.L.; Smith, N.C.

    1978-01-01

    The United States Nuclear Regulatory Commission (NRC) has established the NRC/Reactor Safety Research (RSR) Data Bank Program to provide a means of collecting, processing, and making available experimental data from the many domestic and foreign water reactor safety research programs. The NRC/RSR Data Bank Program collects qualified engineering data from experimental program data bases, stores the data in a single data bank in a common format, and makes the data available to users. The program is designed to be user oriented to minimize the effort required to obtain and manipulate data of interest. The data bank concept and structure embodied in the data bank processing system are applicable to any program where large quantities of scientific (numeric) data are generated and require compiling, storage, and accessing in order to be collected and made available to multiple users. 3 figures

  1. International cooperation during radiological emergencies. NRC program guidance for the provision of technical advice to foreign counterpart organizations

    International Nuclear Information System (INIS)

    Senseney, R.

    1986-04-01

    This report defines the scope, application, and limits of the technical cooperation the Nuclear Regulatory Commission (NRC) would provide, upon request, to a foreign regulatory agency in a nuclear emergency. It outlines the basis for such cooperation, offers a model written agreement, and describes recent cases of NRC assistance. It also identifies non-NRC sources of emergency advisory assistance available to foreign organizations

  2. Agenda 21; Agenda 21

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-03-01

    In the prospect of the Johannesburg international summit in August 2002, the regional council of Midi-Pyrenees region (S France) in partnership with the French ministry of national development and environment has organized a two-days meeting in order to identify and valorize the good practices for the implementation of a sustainable development policy. The basic reference document of this meeting is the 'Agenda 21' program of actions that all governments signatories to the commitments of the Rio summit will have to implement. This document is the complete version in French language of the Agenda 21. It comprises several points dealing with: the environment protection and the abatement of pollution, the management of energy resources with the development of renewable energies, the viable management of the transportation sector, the management of wastes and radioactive wastes, etc.. (J.S.)

  3. Agenda 21; Agenda 21

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-03-01

    In the prospect of the Johannesburg international summit in August 2002, the regional council of Midi-Pyrenees region (S France) in partnership with the French ministry of national development and environment has organized a two-days meeting in order to identify and valorize the good practices for the implementation of a sustainable development policy. The basic reference document of this meeting is the 'Agenda 21' program of actions that all governments signatories to the commitments of the Rio summit will have to implement. This document is the complete version in French language of the Agenda 21. It comprises several points dealing with: the environment protection and the abatement of pollution, the management of energy resources with the development of renewable energies, the viable management of the transportation sector, the management of wastes and radioactive wastes, etc.. (J.S.)

  4. NRC licensing requirements: DOD options

    International Nuclear Information System (INIS)

    Pike, W.J.; O'Reilly, P.D.

    1982-09-01

    This report describes the licensing process (both safety and environmental) that would apply if the Department of Defense (DOD) chooses to obtain licenses from the US Nuclear Regulatory Commission (NRC) for using nuclear energy for power and luminous sources. The specific nuclear energy sources being considered include: small or medium-size nuclear power reactors; radioisotopic thermoelectric generators with 90 Sr or 238 Pu; radioisotopic dynamic electric generators with 90 Sr or 238 Pu; and applications of radioisotopes for luminous sources (lights) with 3 H, 85 Kr, or 147 Pm. The steps of the licensing process are summarized in the following sections, with particular attention given to the schedule and level of effort necessary to support the process

  5. NRC inventory of dams

    International Nuclear Information System (INIS)

    Lear, G.E.; Thompson, O.O.

    1983-01-01

    The NRC Inventory of Dams has been prepared as required by the charter of the NRC Dam Safety Officer. The inventory lists 51 dams associated with nuclear power plant sites and 14 uranium mill tailings dams (licensed by NRC) in the US as of February 1, 1982. Of the 85 listed nuclear power plants (148 units), 26 plants obtain cooling water from impoundments formed by dams. The 51 dams associated with the plants are: located on a plant site (29 dams at 15 plant sites); located off site but provide plant cooling water (18 dams at 11 additional plant sites); and located upstream from a plant (4 dams) - they have been identified as dams whose failure, and ensuing plant flooding, could result in a radiological risk to the public health and safety. The dams that might be considered NRC's responsibility in terms of the federal dam safety program are identified. This group of dams (20 on nuclear power plant sites and 14 uranium mill tailings dams) was obtained by eliminating dams that do not pose a flooding hazard (e.g., submerged dams) and dams that are regulated by another federal agency. The report includes the principal design features of all dams and related useful information

  6. NRC Response to an Act or Threat of Terrorism at an NRC-Licensed Facility

    International Nuclear Information System (INIS)

    Frank Congel

    2000-01-01

    The mandated response to a threat or act of terrorism at a U.S. Nuclear Regulatory Commission (NRC)-licensed facility was examined through a tabletop exercise in May 2000 and a limited field exercise in August 2000. This paper describes some of the new issues addressed and lessons learned from those exercises

  7. Transition to an operating reactor environment: implications for NRC quality assurance programs based on nuclear power industry and regulatory projections through 1995

    International Nuclear Information System (INIS)

    Christensen, J.A.; Schuller, C.R.; Harty, H.; Patrick, M.G.

    1986-03-01

    This report develops projections for nuclear power plant regulatory needs in general, and those relating to quality assurance in particular, for the time period 1985 to 1995. This required an assessment of future prospects for the nuclear power industry and its primary segments. Electric power demand projections and their relationship to estimated schedules for nuclear plant construction and operations were evaluated, and estimates of anticipated business volume and long-term economic viability were made for each of the major segments of the US nuclear industry (utilities, NSSS vendors, AEs, constructors, component suppliers, and service vendors). These estimates were made for two, five and ten year intervals through 1995. Other significant factors that are not specific to any one industry segment were also reviewed. These included: (1) the expanding foreign presence in US markets; (2) pending legislations; (3) trends in personnel availability; (4) new institutional arrangements for nuclear power generation; (5) nuclear plant aging, life extension, and decommissioning; (6) reactivation of mothballed projects; (7) advanced and standardized plant designs; and (8) likely technological development in computer applications and inspections methods

  8. NRC TLD Direct Radiation Monitoring Network

    International Nuclear Information System (INIS)

    Struckmeyer, R.; McNamara, N.

    1991-04-01

    This report presents the results of the NRC [Nuclear Regulatory Commission] Direct Radiation Monitoring Network for the fourth quarter of 1990. It provides the ambient radiation levels measured in the vicinity of 75 sites throughout the United States. In addition, it describes the equipment used, monitoring station selection criteria, characterization of the dosimeter response, calibration procedures, statistical methods, intercomparison, and quality assurance program. 3 figs., 4 tabs

  9. 75 FR 12804 - Withdrawal of Regulatory Guide 8.6

    Science.gov (United States)

    2010-03-17

    ... ``Regulatory Guides'' in the NRC's Electronic Reading Room at http://www.nrc.gov/reading-rm/doc-collections... NUCLEAR REGULATORY COMMISSION [NRC-2010-0103] Withdrawal of Regulatory Guide 8.6 AGENCY: Nuclear Regulatory Commission. ACTION: Withdrawal of Regulatory Guide 8.6, ``Standard Test Procedure for Geiger-M...

  10. 75 FR 45171 - Notice of Issuance of Regulatory Guide

    Science.gov (United States)

    2010-08-02

    ... ``Regulatory Guides'' at http://www.nrc.gov/reading-rm/doc-collections/ and through the NRC's Agencywide... NUCLEAR REGULATORY COMMISSION [NRC-2010-0072] Notice of Issuance of Regulatory Guide AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Regulatory Guide 3.13...

  11. 75 FR 20868 - Notice of Issuance of Regulatory Guide

    Science.gov (United States)

    2010-04-21

    ... available through the NRC's public Web site under ``Regulatory Guides'' at http://www.nrc.gov/reading-rm/doc... NUCLEAR REGULATORY COMMISSION [NRC-2009-0351] Notice of Issuance of Regulatory Guide AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Regulatory Guide 1.68.2...

  12. 75 FR 42170 - Final Regulatory Guide: Issuance, Availability

    Science.gov (United States)

    2010-07-20

    ... NRC's public Web site under ``Regulatory Guides'' at http://www.nrc.gov/reading-rm/doc-collections... NUCLEAR REGULATORY COMMISSION [NRC-2009-0425] Final Regulatory Guide: Issuance, Availability AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Regulatory Guide...

  13. 75 FR 81675 - Notice of Issuance of Regulatory Guide

    Science.gov (United States)

    2010-12-28

    ... through the NRC's public Web site under ``Regulatory Guides'' at http://www.nrc.gov/reading-rm/doc... NUCLEAR REGULATORY COMMISSION [NRC-2010-0031] Notice of Issuance of Regulatory Guide AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Regulatory Guide 4.16...

  14. 75 FR 48381 - Final Regulatory Guide: Issuance, Availability

    Science.gov (United States)

    2010-08-10

    ... NRC's public Web site under ``Regulatory Guides'' at http://www.nrc.gov/reading-rm/doc-collections... NUCLEAR REGULATORY COMMISSION [NRC-2010-0274] Final Regulatory Guide: Issuance, Availability AGENCY: Nuclear Regulatory Commission. ACTION: Notice of issuance and availability of Regulatory Guide...

  15. 75 FR 43207 - Notice of Issuance of Regulatory Guide

    Science.gov (United States)

    2010-07-23

    ... NRC's public Web site under ``Regulatory Guides'' at http://www.nrc.gov/reading-rm/doc-collections... NUCLEAR REGULATORY COMMISSION [NRC-2009-0282] Notice of Issuance of Regulatory Guide AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Regulatory Guide 1.141...

  16. 75 FR 20399 - Notice of Issuance of Regulatory Guide

    Science.gov (United States)

    2010-04-19

    ... the NRC's public Web site under ``Regulatory Guides'' at http://www.nrc.gov/reading-rm/doc-collections... NUCLEAR REGULATORY COMMISSION [NRC-2009-0418] Notice of Issuance of Regulatory Guide AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Regulatory Guide 6.9...

  17. 76 FR 31382 - Notice of Issuance of Regulatory Guide

    Science.gov (United States)

    2011-05-31

    ... the NRC's public Web site under ``Regulatory Guides'' at http://www.nrc.gov/reading-rm/doc-collections... NUCLEAR REGULATORY COMMISSION [NRC-2010-0287] Notice of Issuance of Regulatory Guide AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Regulatory Guide 8.2...

  18. NRC perspective and experience on valve testing

    International Nuclear Information System (INIS)

    Eapen, P.K.

    1990-01-01

    Testing of safety related valves is one of the major activities at commercial nuclear power plants. In addition to Technical Specification, valve testing is required in 10 CFR 50.55a and 10 CFR 50 Appendix J. NRC inspectors (both resident and specialists) spend a considerable amount of time in following the valve test activities as part of their routine business. In the past, depending on a licensee's organizational structure, a valve could be tested more than three times to verify conformance with Technical Specifications, 10 CFR 50.55a, and 10 CFR 50 Appendix J. The regulatory reviewers were isolated from each other. Licensee test personnel were also not communicating among themselves. As a result, NRC inspectors found that certain valves in the IST program were inadequately tested. The typical licensee response was to say that this valve is exempted from testing under Appendix J. Others would say that the technical specification does not require fast closure of a valve in question. In addition to the above, the inspectors had to deal with exemption requests that were not dispositioned by the NRC. In the seventies there was a gentlemen's agreement to allow the licensee to do the testing in accordance with the exception, without waiting for the NRC approval. Needless to say when the new NRC inspection procedure was issued in March 1989 for implementation, the Regional inspectors had extremely difficult time to cope with the gray areas of valve testing. In August 1987, NRC Region I was reorganized and the special test program section was established to perform inspections in the IST area. This section was chartered to optimize resources and develop a meaningful inspection plan. The perspectives and insights used in the development of a detailed inspection plan is discussed below

  19. Development of the NRC's Human Performance Investigation Process (HPIP)

    International Nuclear Information System (INIS)

    Paradies, M.; Unger, L.; Haas, P.; Terranova, M.

    1993-10-01

    The three volumes of this report detail a standard investigation process for use by US Nuclear Regulatory Commission (NRC) personnel when investigating human performance related events at nuclear power plants. The process, called the Human Performance Investigation Process (HPIP), was developed to meet the special needs of NRC personnel, especially NRC resident and regional inspectors. HPIP is a systematic investigation process combining current procedures and field practices, expert experience, NRC human performance research, and applicable investigation techniques. The process is easy to learn and helps NRC personnel perform better field investigations of the root causes of human performance problems. The human performance data gathered through such investigations provides a better understanding of the human performance issues that cause events at nuclear power plants. This document, Volume III, is a detailed documentation of the development effort and the pilot training program

  20. Development of the NRC's Human Performance Investigation Process (HPIP)

    International Nuclear Information System (INIS)

    Paradies, M.; Unger, L.; Haas, P.; Terranova, M.

    1993-10-01

    The three volumes of this report detail a standard investigation process for use by US Nuclear Regulatory Commission (NRC) personnel when investigating human performance related events at nuclear power plants. The process, called the Human Performance Investigation Process (HPIP), was developed to meet the special needs of NRC personnel, especially NRC resident and regional inspectors. HPIP is a systematic investigation process combining current procedures and field practices, expert experience, NRC human performance research, and applicable investigation techniques. The process is easy to learn and helps NRC personnel perform better field investigations of the root causes of human performance problems. The human performance data gathered through such investigations provides a better understanding of the human performance issues that cause events at nuclear power plants. This document, Volume I is a concise description of the need for the human performance investigation process, the process' components, the methods used to develop the process, the methods proposed to test the process, and conclusions on the process' usefulness

  1. Safeguards at NRC licensed facilities: Are we doing enough

    International Nuclear Information System (INIS)

    Asselstine, J.K.

    1986-01-01

    Safeguards at the Nuclear Regulatory Commission (NRC) facilities are discussed in this paper. The NRC is pursuing a number of initiatives in the safeguards area. The Commission is conducting a reassessment of its safeguards design basis threat statements to consider the possible implications of an explosive-laden vehicle for U.S. nuclear safeguards and to examine the comparability of safeguards features at NRC-licensed and DOE facilities. The Commission is also completing action on measures to protect against the sabotage threat from an insider at NRC-licensed facilities, and is examining the potential safety implications of safeguards measures. Finally, the NRC has developed measures to reduce the theft potential for high-enriched uranium

  2. Development of the NRC's Human Performance Investigation Process (HPIP)

    International Nuclear Information System (INIS)

    Paradies, M.; Unger, L.; Haas, P.; Terranova, M.

    1993-10-01

    The three volumes of this report detail a standard investigation process for use by US Nuclear Regulatory Commission (NRC) personnel when investigating human performance related events at nuclear power plants. The process, called the Human Performance Investigation Process (HPIP), was developed to meet the special needs of NRC personnel, especially NRC resident and regional inspectors. HPIP is a systematic investigation process combining current procedures and field practices, expert experience, NRC human performance research, and applicable investigation techniques. The process is easy to learn and helps NRC personnel perform better field investigations of the root causes of human performance problems. The human performance data gathered through such investigations provides a better understanding of the human performance issues that cause event at nuclear power plants. This document, Volume II, is a field manual for use by investigators when performing event investigations. Volume II includes the HPIP Procedure, the HPIP Modules, and Appendices that provide extensive documentation of each investigation technique

  3. The roles of NRC research in risk-informed, performance-based regulation

    International Nuclear Information System (INIS)

    Morrison, D.L.; Murphy, J.A.; Hodges, M.W.; Cunningham, M.A.; Drouin, M.T.; Ramey-Smith, A.M.; VanderMolen, H.

    1997-01-01

    The NRC is expanding the use of probabilistic risk analysis (PRA) throughout the spectrum of its regulatory activities. The NRC's research program in PRA supports this expansion in a number of ways, from performing basic research to developing guidance for regulatory applications. The author provides an overview of the NRC's PRA research program, then focuses on two key activities - the review of individual plant examinations, and the development of guidance for use of PRA in reactor regulation

  4. Recent developments in NRC guidelines for atmosphere cleanup systems

    International Nuclear Information System (INIS)

    Bellamy, R.R.

    1976-01-01

    The Nuclear Regulatory Commission (NRC) maintains the policy of updating when necessary, its published guidance for the design of engineered safety feature (ESF) and normal ventilation systems. The guidance is disseminated by means of issuing new, or revisions to, existing Regulatory Guides, Standard Review Plans, Branch Technical Positions and Technical Specifications. A revised Regulatory Guide, new Technical Specifications and new Standard Review Plans with Branch Technical Positions for atmosphere cleanup systems are discussed. Regulatory Guide 1.52, ''Design, Testing and Maintenance Criteria for Atmosphere Cleanup System Air Filtration and Adsorption Units of Light-Water-Cooled Nuclear Power Plants,'' was issued in July 1973. The major comments received from the nuclear industry since the guide was issued, NRC's experience in implementing the guide in recent license applications, status of operating plants in meeting the guidelines and NRC's continuing assessment of operating data and laboratory tests to assure that the guide reflects the latest technology are discussed

  5. NRC/RSR data bank program

    International Nuclear Information System (INIS)

    Bankert, S.F.; Evans, C.D.; Hardy, H.A.; Litteer, G.L.; Schulz, G.L.; Smith, N.C.

    1978-01-01

    The United States Nuclear Regulatory Commission (NRC) has established at the Idaho National Engineering Laboratory (INEL) the NRC/Reactor Safety Research (RSR) Data Bank Program. The program is under the direction of EG and G Idaho, Inc., and is intended to provide the means of collecting, processing, and making available experimental data from the many water reactor safety research programs. The NRC/RSR Data Bank Program collects qualified engineering data on a prioritized basis from experimental program data bases, stores the data in a single data bank in a common format, and makes the data available to users. The NRC/RSR Data Bank specializes in water reactor safety experimental data, but it has a number of other scientific applications where large amounts of numeric data are or will be available. As an example of size, a single water reactor safety test may generate 10 million data words. Future examples of the use of a data bank might be in gathering data on low head hydraulics, solar projects, and liquid metal reactor safety data

  6. Safeguards at NRC licensed facilities: Are we doing enough

    International Nuclear Information System (INIS)

    Asselstine, J.K.

    1986-01-01

    The Nuclear Regulatory Commission is pursuing a number of initiatives in the safeguards area. The Commission is conducting a reassessment of its safeguards design basis threat statements to consider the possible implications of an explosive-laden vehicle for U.S. nuclear safeguards and to examine the comparability of safeguards features at NRC-licensed and DOE facilities. The Commission is also completing action on measures to protect against the sabotage threat from an insider at NRC-licensed facilities, and is examining the potential safety implications of safeguards measures. Finally, the NRC has developed measures to reduce the theft potential for high-enriched uranium

  7. Amalgamation of performance indicators to support NRC senior management reviews

    International Nuclear Information System (INIS)

    Wreathall, J.; Schurman, D.; Modarres, M.; Mosleh, A.; Anderson, N.; Reason, J.

    1991-01-01

    The purpose of this project is to develop a methodology for amalgamating performance indicators to provide an overall perspective on plant safety, as one input to Nuclear Regulatory Commission's (NRC) senior management reviews of plant safety. These reviews are used to adjust the level of oversight by NRC. Work completed to date includes the development of frameworks for relating indicator measures to safety, a classification scheme for performance indicators, and a mapping process to portray indicators in the frameworks

  8. U.S. NRC training for research and training reactor inspectors

    International Nuclear Information System (INIS)

    Sandquist, G.M.; Kunze, J.F.

    2011-01-01

    Currently, a large number of license activities (Early Site Permits, Combined Operating License, reactor certifications, etc.), are pending for review before the United States Nuclear Regulatory Commission (US NRC). Much of the senior staff at the NRC is now committed to these review and licensing actions. To address this additional workload, the NRC has recruited a large number of new Regulatory Staff for dealing with these and other regulatory actions such as the US Fleet of Research and Test Reactors (RTRs). These reactors pose unusual demands on Regulatory Staff since the US Fleet of RTRs, although few (32 Licensed RTRs as of 2010), they represent a broad range of reactor types, operations, and research and training aspects that nuclear reactor power plants (such as the 104 LWRs) do not pose. The US NRC must inspect and regulate all these entities. This paper addresses selected training topics and regulatory activities provided US NRC Inspectors for US RTRs. (author)

  9. NRC [Nuclear Regulatory Commission] editorial style guide

    International Nuclear Information System (INIS)

    Beeson, J.F.; Calure, B.A.; Gable, D.; Lesar, M.T.; Mejac, M.F.; Sanders, R.F.

    1989-10-01

    Editorial style refers to the choices that writers, editors, and secretaries make to eliminate inconsistencies in their documents. These choices apply to the recurrent features of a document such as abbreviations, capitalization, compound words, numbers, symbols, and punctuation, as well as to references and footnotes. Making these choices is sometimes difficult because usage changes as the language evolves. Consider the use of hyphens, for example. Do we write non-power reactor or nonpower reactor? Is it on-site incident or onsite incident? Although usage is moving away from the use of hyphens with prefixes, the authorities who compile style guides do not always agree about which choice to use at a given time. Moreover, each discipline -- law, physics, mathematics -- has specific standards that apply to the publications for that discipline. Even in an area as seemingly certain as spelling, overlapping usage exists. Reputable dictionaries show both ''align'' and ''aline'' as correct spellings. Likewise, ''disc, disk, and diskette'' currently coexist as equally valid choices

  10. NRC/UBC Node

    Energy Technology Data Exchange (ETDEWEB)

    Ellis-Perry, B. [Univ. of British Columbia, Vancouver, British Columbia (Canada); Yogendran, Y. [NRC Inst. for Fuel Cell Innovation, Vancouver, British Columbia (Canada)

    2004-07-01

    'Full text:' In the search for cleaner, more sustainable energy sources, many of the most promising breakthroughs have been in hydrogen technology. However, this promise will remain unfulfilled without public interest and enthusiasm, and without the infrastructure to support the technology. In order to get there, we have to test, perfect, and demonstrate technology that is safe and affordable, and we must do so in practical, familiar settings. Ideally, such settings should be easily accessible to the engineers, planners, and architects of tomorrow while providing a showcase for hydrogen technology that will attract the general public. This place is the NRC/UBC Hydrogen Node. The UBC campus in Point Grey is home to leading edge, internationally recognized researchers in a range of disciplines, both within the University and at the NRC Institute for Fuel Cell Innovation. On average, 40,000 students, faculty, and staff use the campus every day; UBC graduates go on to leadership positions in communities around the globe. Its spectacular setting makes UBC a popular destination for thousands of visitors from around the world. In 2006 UBC will host the World Urban Forum, and in 2010 it will be one of the sites for the Vancouver-Whistler Olympic Games. UBC and its South Campus neighbourhoods are developing as a model sustainable community, offering an excellent opportunity to develop and showcase hydrogen infrastructure and technology in a real-life, attractive setting that will be seen by thousands of people around the world. UBC's facilities, location, and Trek 2010 commitment to excellence in learning, research, and sustainability make it an ideal location for such a project. The H2 Village at UBC will be an integrated hydrogen demonstration project, linked to the hydrogen highway. This project is bringing together leading companies, researchers, and government agencies committed to making the refinement and early adoption of safe hydrogen technology a

  11. NRC/UBC Node

    International Nuclear Information System (INIS)

    Ellis-Perry, B.; Yogendran, Y.

    2004-01-01

    'Full text:' In the search for cleaner, more sustainable energy sources, many of the most promising breakthroughs have been in hydrogen technology. However, this promise will remain unfulfilled without public interest and enthusiasm, and without the infrastructure to support the technology. In order to get there, we have to test, perfect, and demonstrate technology that is safe and affordable, and we must do so in practical, familiar settings. Ideally, such settings should be easily accessible to the engineers, planners, and architects of tomorrow while providing a showcase for hydrogen technology that will attract the general public. This place is the NRC/UBC Hydrogen Node. The UBC campus in Point Grey is home to leading edge, internationally recognized researchers in a range of disciplines, both within the University and at the NRC Institute for Fuel Cell Innovation. On average, 40,000 students, faculty, and staff use the campus every day; UBC graduates go on to leadership positions in communities around the globe. Its spectacular setting makes UBC a popular destination for thousands of visitors from around the world. In 2006 UBC will host the World Urban Forum, and in 2010 it will be one of the sites for the Vancouver-Whistler Olympic Games. UBC and its South Campus neighbourhoods are developing as a model sustainable community, offering an excellent opportunity to develop and showcase hydrogen infrastructure and technology in a real-life, attractive setting that will be seen by thousands of people around the world. UBC's facilities, location, and Trek 2010 commitment to excellence in learning, research, and sustainability make it an ideal location for such a project. The H2 Village at UBC will be an integrated hydrogen demonstration project, linked to the hydrogen highway. This project is bringing together leading companies, researchers, and government agencies committed to making the refinement and early adoption of safe hydrogen technology a reality

  12. 75 FR 5630 - Draft Regulatory Guide: Issuance, Availability

    Science.gov (United States)

    2010-02-03

    ... ``Regulatory Guides'' collection of the NRC's Electronic Reading Room at http://www.nrc.gov/reading-rm/doc... NUCLEAR REGULATORY COMMISSION [NRC-2010-0031] Draft Regulatory Guide: Issuance, Availability... Guide, DG-4017. FOR FURTHER INFORMATION CONTACT: Gregory Chapman, U.S. Nuclear Regulatory Commission...

  13. 75 FR 7526 - Withdrawal of Regulatory Guide

    Science.gov (United States)

    2010-02-19

    ...'s Electronic Reading Room at http://www.nrc.gov/reading-rm/doc-collections . Regulatory guides are... NUCLEAR REGULATORY COMMISSION [NRC-2010-0052] Withdrawal of Regulatory Guide AGENCY: Nuclear Regulatory Commission. ACTION: Withdrawal of Regulatory Guide 1.56, ``Maintenance of Water Purity in Boiling...

  14. Risk-based regulation - an NRC perspective and status

    International Nuclear Information System (INIS)

    King, T.L.; Murphy, J.A.

    1993-01-01

    The consideration of risk in regulatory decision making has traditionally been part of the US Nuclear Regulatory Commission's (NRC's) policy and practice. In the early days of regulation, this consideration was more qualitative in nature and was reflected in prescriptive/deterministic regulatory requirements. However, with the development of quantitative risk assessment methods, more detailed and comprehensive (although not complete) risk information on nuclear power plants is available to the designer, operator, and regulator. The availability of such information provides an opportunity to assess the need for change in the current regulatory structure and to develop future regulatory requirements in a less prescriptive, more performance-oriented fashion

  15. U.S. NRC's generic issues program

    International Nuclear Information System (INIS)

    Kauffman, J.V.; Foster, J.W.

    2008-01-01

    The United States Nuclear Regulatory Commission (NRC) has a Generic Issues Program (GIP) to address Generic Issues (GI). A GI is defined as 'a regulatory matter involving the design, construction, operation, or decommissioning of several, or a class of, NRC licensees or certificate holders that is not sufficiently addressed by existing rules, guidance, or programs'. This rather legalistic definition has several practical corollaries: First, a GI must involve safety. Second, the issue must involve at least two plants, or it would be a plant-specific issue rather than a GI. Third, the potential safety question must not be covered by existing regulations and guidance (compliance). Thus, the effect of a GI is to potentially change the body of regulations and associated guidance (e.g., regulatory guides). The GIP was started in 1976, thus it is a relatively mature program. Approximately 850 issues have been processed by the program to date. More importantly, even after 30 years, new GIs continue to be proposed. The entire set of Generic Issues (GIs) is updated annually in NUREG-0933, 'A Prioritization of Generic Safety Issues'. GIs normally involve complex questions of safety and regulation. Efficient and effective means of addressing these issues are very important for regulatory effectiveness. If an issue proves to pose a genuine, significant safety question, then swift, effective, enforceable, and cost-effective action needs to be taken. Conversely, if an issue is of little safety significance, the issue should be dismissed in an expeditious manner, avoiding unnecessary expenditure of resources and regulatory burden or uncertainty. This paper provides a summary of the 5-stage program, from identification through the regulatory assessment stage. The paper also includes a discussion of the program's seven criteria, sources of proposed GIs, recent improvements, publicly available information, historical performance, and status of current GIs. (authors)

  16. NRC/DAE reactor safety research Data Bank

    International Nuclear Information System (INIS)

    Laats, E.T.

    1982-01-01

    In 1976, the United States Nuclear Regulatory Commission (NRC) established the NRC/Division of Accident Evaluation (DAE) Data Bank to collect, store, and make available data from the many domestic and foreign water reactor safety research programs. This program has since grown from the conceptual stage to a useful, usable service for computer code development, code assessment, and experimentation groups in meeting the needs of the nuclear industry. Data from 20 facilities are now processed and permanently stored in the Data Bank, which utilizes the Control Data Corporation (CDC) CYBER 176 computer system located at the Idaho National Engineering Laboratory (INEL). New data and data sources are continually being added to the Data Bank. In addition to providing data storage and access software, the Data Bank program supplies data entry, documentation, and training and advisory services to users and the NRC. Management of the NRC/DAE Data Bank is provided by EG and G Idaho, Inc

  17. NRC influences on nuclear training

    International Nuclear Information System (INIS)

    Hannon, J.N.

    1987-01-01

    NRC influences on utility training programs through prescriptive requirements and evaluation of industry self-initiatives are discussed. NRC regulation and industry initiatives are complimentary and in some instances industry initiatives are replacing NRC requirements. Controls and feedback mechanisms designed to enhance positive NRC influences and minimize or eliminate negative influences are discussed. Industry and NRC efforts to reach an acceptable mix between regulator oversight and self-initiatives by the industry are recognized. Problem areas for continued cooperation to enhance training and minimize conflicting signals to industry are discussed. These areas include: requalification examination scope and content, depth of training and examination on emergency procedures; improved learning objectives as the basis for training and examination, and severe accident training

  18. Recent NRC research activities addressing valve and pump issues

    Energy Technology Data Exchange (ETDEWEB)

    Morrison, D.L.

    1996-12-01

    The mission of the U.S. Nuclear Regulatory Commission (NRC) is to ensure the safe design, construction, and operation of commercial nuclear power plants and other facilities in the U.S.A. One of the main roles that the Office of Nuclear Regulatory Research (RES) plays in achieving the NRC mission is to plan, recommend, and implement research programs that address safety and technical issues deemed important by the NRC. The results of the research activities provide the bases for developing NRC positions or decisions on these issues. Also, RES performs confirmatory research for developing the basis to evaluate industry responses and positions on various regulatory requirements. This presentation summarizes some recent RES supported research activities that have addressed safety and technical issues related to valves and pumps. These activities include the efforts on determining valve and motor-operator responses under dynamic loads and pressure locking events, evaluation of monitoring equipment, and methods for detecting and trending aging of check valves and pumps. The role that RES is expected to play in future years to fulfill the NRC mission is also discussed.

  19. NRC TLD Direct Radiation Monitoring Network

    International Nuclear Information System (INIS)

    Struckmeyer, R.; McNamara, N.

    1992-06-01

    The US Nuclear Regulatory Commission (NRC) Direct Radiation Monitoring Network is operated by the NRC in cooperation with participating states to provide continuous measurement of the ambient radiation levels around licensed NRC facilities, primarily power reactors. Ambient radiation levels result from naturally occurring radionuclides present in the soil, cosmic radiation constantly bombarding the earth from outer space, and the contribution, if any, from the monitored facilities and other man-made sources. The Network is intended to measure radiation levels during routine facility operations and to establish background radiation levels used to assess the radiological impact of an unusual condition, such as an accident. This report presents the radiation levels measured around all facilities in the Network for the first quarter of 1992. All radiation measurements are made using small, passive detectors called thermoluminescent dosimeters (TLDs), which provide a quantitative measurement of the radiation levels in the area in which they are placed. Each site is monitored by arranging approximately 40 to 50 TLD stations in two concentric rings extending to about five miles from the facility. All TLD stations are outside the site boundary of the facility

  20. Current NRC activities related to MQA

    Energy Technology Data Exchange (ETDEWEB)

    Trottier, C.A.; Nellis, D.O. [Nuclear Regulatory Commission, Washington, DC (United States)

    1993-12-31

    The U.S. Nuclear Regulatory Commission`s (NRC`s) interest in measurement quality assurance (MQA) goes back to before 1963, when the Atomic Energy Commission (AEC) published a notice in the Federal Register concerning the need for establishing a Film Dosimetry Calibration Laboratory, and also provided a set of minimum performance criteria to be used by the laboratory in evaluating film dosimetry services used by licensees. The proposed laboratory was not established, but in 1967 the AEC contracted with Battelle`s Pacific Northwest Laboratory (PNL) to evaluate film dosimeter performance criteria and provide a basis for establishing a Film Dosimetry Calibration Laboratory if the study showed that it was needed. Then, in 1973, the Conference of Radiation Control Program Directors (CRCPD), concerned with the state of dosimetry processing and the lack of adequate standards, recommended that the National Bureau of Standards (NBS) direct a performance testing program for personnel dosimetry processing services. Later, in 1976, NRC asked PNL to conduct a study to evaluate the four existing performance standards for personnel dosimetry processing. One result of this study was that the HPSSC standard, which later became ANSI N13.11, was recommended as the standard for use in a national dosimetry processing program. The rest is common knowledge. With the support of numerous other federal agencies and the CRCPD, NRC published a regulation, effective in 1988, that required all processors of personnel dosimeters be accredited under the National Voluntary Laboratory Accreditation Program (NVLAP), operated by the NBS, which is now called the National Institute of Standards and Technology (NIST). At present, there are 75 dosimetry processing laboratories accredited under NVLAP. NRC has also been involved in extremity dosimeters, health physics survey instruments, bioassay measurements, electronic personnel dosimeters, and environmental monitoring around nuclear power plants.

  1. Memorandum of Understanding Between U.S. EPA Superfund and U.S. NRC

    International Nuclear Information System (INIS)

    Walker, Stuart

    2008-01-01

    The Environmental Protection Agency (EPA) Office of Superfund Remediation and Technology Innovation (OSRTI) and the Nuclear Regulatory Commission (NRC) are responsible for implementing the 'Memorandum of Understanding Between the Environmental Protection Agency and the Nuclear Regulatory Commission: Consultation and Finality on Decommissioning and Decontamination of Contaminated Sites'. This paper provides a brief overview of the origin of the Memorandum of Understanding (MOU), the major features of the MOU, and how the MOU has been implemented site specifically. EPA and NRC developed the MOU in response to direction from the House Committee on Appropriations to EPA and NRC to work together to address the potential for dual regulation. The MOU was signed by EPA on September 30, 2002 and NRC on October 9, 2002. The two agencies had worked on the MOU since March 2000. While both EPA and NRC have statutory authority to clean up these sites, the MOU provides consultation procedures between EPA and NRC to eliminate dual regulation. Under the MOU, EPA and NRC identified the interactions of the two agencies for the decommissioning and decontamination of NRC-licensed sites and the ways in which those responsibilities will be exercised. Except for Section VI, which addresses corrective action under the Resource Conservation and Recovery Act (RCRA), this MOU is limited to the coordination between EPA, when acting under its CERCLA authority, and NRC, when a facility licensed by the NRC is undergoing decommissioning, or when a facility has completed decommissioning, and the NRC has terminated its license. EPA believes that implementation of the MOU between the two agencies will ensure that future confusion about dual regulation does not occur regarding the cleanup and reuse of NRC-licensed sites. NRC and EPA have so far exchanged MOU consultation letters on eight NRC-licensed sites. EPA has responded to each consultation request with a letter expressing its views on actions

  2. 75 FR 79049 - Notice of Issuance of Regulatory Guide

    Science.gov (United States)

    2010-12-17

    ... site under ``Regulatory Guides'' at http://www.nrc.gov/reading-rm/doc-collections/ . The regulatory... NUCLEAR REGULATORY COMMISSION [NRC-2008-0427] Notice of Issuance of Regulatory Guide AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Regulatory Guide 3.12...

  3. 75 FR 45173 - Notice of Issuance of Regulatory Guide

    Science.gov (United States)

    2010-08-02

    ... ``Regulatory Guides'' at http://www.nrc.gov/reading-rm/doc-collections/ . In addition, regulatory guides are... NUCLEAR REGULATORY COMMISSION [NRC-2008-0638] Notice of Issuance of Regulatory Guide AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Regulatory Guide 1.151...

  4. 76 FR 18262 - Notice of issuance of Regulatory Guide

    Science.gov (United States)

    2011-04-01

    ... site under ``Regulatory Guides'' at http://www.nrc.gov/reading-rm/doc-collections/ . The regulatory... NUCLEAR REGULATORY COMMISSION [NRC-2009-0277] Notice of issuance of Regulatory Guide AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Regulatory Guide 1.44...

  5. 76 FR 14107 - Notice of Issuance of Regulatory Guide

    Science.gov (United States)

    2011-03-15

    ... site under ``Regulatory Guides'' at http://www.nrc.gov/reading-rm/doc-collections/ . The regulatory... NUCLEAR REGULATORY COMMISSION [NRC-2009-0276] Notice of Issuance of Regulatory Guide AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Regulatory Guide 1.43...

  6. 76 FR 14108 - Notice of Issuance of Regulatory Guide

    Science.gov (United States)

    2011-03-15

    ... site under ``Regulatory Guides'' at http://www.nrc.gov/reading-rm/doc-collections/ . The regulatory... NUCLEAR REGULATORY COMMISSION [NRC-2009-0275] Notice of Issuance of Regulatory Guide AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Regulatory Guide 1.50...

  7. NRC new sustainable building

    International Nuclear Information System (INIS)

    Semczyszyn, D.

    2004-01-01

    'Full text:' The National Research Council Institute For Fuel Cell Innovation is relocating to a purpose-built 71,343 sq. Ft. (6598 sq. M) Research, Testing, Evaluation, and Industry Incubation Facility in the spring of 2006. The new facility will contain Hydrogen-ready laboratories, the existing relocated Hydrogen Safe Environmental Test Chamber, a hydrogen vehicle maintenance bay, a hydrogen vehicle refuelling station, and the following demonstration projects and features: 1. A Ground Source Heat Pump: This long-proven natural-source heating and cooling technology to provide climate control for the new IFCI's atrium and galleria. It is being designed by Keen Engineering of North Vancouver, BC. 2. 5 KW Solid Oxide Fuel Cell System: Fuelled by natural gas and in the future, from biomass, the fuel cell will also produce approximately 15 kW of waste heat, which will be captured and used to supply heat for the building. The Solid Oxide Fuel Cell will be supplied by Fuel Cell Technologies in Kingston, ON. 3. LEED Building certification: Attaining LEED 'green building' certification is considered an important complement to the plans for the new NRC-IFCI, because it will provide respected third-party verification of government's commitment to efficient building design and construction. Project architects Bunting Coady of Vancouver, BC believe the IFCI has strong potential to earn gold LEED certification. 4. Photovoltaic hydrogen source for back-up power fuel cell system: A photovoltaic array will capture energy from sunlight to power an electrolyzer that will produce and store hydrogen for a PEM fuel cell emergency backup power system. The electrolyzer will be provided by Hydrogenics of Mississauga, ON. Photovoltaics are being designed and installed by the British Columbia Institute of Technology. (author)

  8. 10 CFR 51.104 - NRC proceeding using public hearings; consideration of environmental impact statement.

    Science.gov (United States)

    2010-01-01

    ... environmental impact statement. 51.104 Section 51.104 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED....104 NRC proceeding using public hearings; consideration of environmental impact statement. (a)(1) In... scope of NEPA and this subpart are in issue, the NRC staff may not offer the final environmental impact...

  9. 76 FR 54507 - Proposed Generic Communication; Draft NRC Generic Letter 2011-XX: Seismic Risk Evaluations for...

    Science.gov (United States)

    2011-09-01

    ... NUCLEAR REGULATORY COMMISSION [NRC-2011-0204] Proposed Generic Communication; Draft NRC Generic... functions. SSCs in operating nuclear power plants are designed either in accordance with, or have been... nuclear reactors. The background information relevant to this GL includes the individual plant...

  10. 76 FR 40052 - Regulatory Agenda

    Science.gov (United States)

    2011-07-07

    ... for Infusion Pumps. 165 Food Labeling: Nutrition 0910-AG56 Labeling for Food Sold in Vending Machines. 166 Food Labeling: Nutrition 0910-AG57 Labeling of Standard Menu Items in Restaurants and Similar... American Recovery and Reinvestment Act of 2009). Timetable: Action Date FR Cite NPRM 07/14/10 75 FR 40867...

  11. 78 FR 1574 - Regulatory Agenda

    Science.gov (United States)

    2013-01-08

    ... of the American people; increasing efficiency, transparency, and accountability of HHS programs; and... Drug 0910-AG14 Marketing Act of 1987; Prescription Drug Amendments of 1992; Policies, Requirements, and... second action addresses products marketed for children under 2 years old and weight- and age-based dosing...

  12. 75 FR 79763 - Regulatory Agenda

    Science.gov (United States)

    2010-12-20

    ... and Youth 306 Opioid Drugs in Maintenance or Detoxification Treatment of Opiate Addiction (Section..., 330 Independence Avenue SW., Washington, DC 20201 Phone: 202 619-1368 Email: [email protected] RIN...., Washington, DC 20201 Phone: 202 690-7151 RIN: 0991-AB58 Department of Health and Human Services (HHS) Long...

  13. 77 FR 7946 - Regulatory Agenda

    Science.gov (United States)

    2012-02-13

    ... Nutrition and Supplement Facts Labels. 351 Over-the-Counter (OTC) 0910-AF40 Drug Review-Oral Health [email protected] . RIN: 0910-AF22 351. Over-the-Counter (OTC) Drug Review--Oral Health Care Products... approved new drug application, may be legally marketed. The NPRM and final action will address oral health...

  14. 78 FR 44251 - Regulatory Agenda

    Science.gov (United States)

    2013-07-23

    ... Serving Size Declaration for Hard Candies and Breath Mints. 22 Supplemental Applications 0910-AG94..., as well as style and formatting standards. FDA is taking this action to provide pet owners and animal... and Serving Size Declaration for Hard Candies and Breath Mints Legal Authority: 21 U.S.C. 321; 21 U.S...

  15. 75 FR 21781 - Regulatory Agenda

    Science.gov (United States)

    2010-04-26

    ...-AB58 Specifications, and Certification Criteria for Electronic Health Record Technology (Rulemaking... Electronic Submission of Data From Studies Evaluating Human Drugs and Biologics....... 0910-AC52 137 Over-the... 147 Cigars Subject to the Family Smoking Prevention and Tobacco Control Act 0910-AG38 Food and Drug...

  16. 75 FR 79799 - Regulatory Agenda

    Science.gov (United States)

    2010-12-20

    ... Accessible Design, which establish requirements for the design and construction of accessible facilities that... requirement for the rule, the social and economic realities faced by Americans with disabilities dictate the...

  17. 75 FR 21819 - Regulatory Agenda

    Science.gov (United States)

    2010-04-26

    ... Accessible Design, which establish requirements for the design and construction of accessible facilities that... addition to the statutory requirement for the rule, the social and economic realities faced by Americans...

  18. NRC policy on future reactor designs

    International Nuclear Information System (INIS)

    1985-07-01

    On April 13, 1983, the US Nuclear Regulatory Commission issued for public comment a ''Proposed Commission Policy Statement on Severe Accidents and Related Views on Nuclear Reactor Regulation'' (48 FR 16014). This report presents and discusses the Commission's final version of that policy statement now entitled, ''Policy Statement on Severe Reactor Accidents Regarding Future Designs and Existing Plants.'' It provides an overview of comments received from the public and the Advisory Committee on Reactor Safeguards and the staff response to these. In addition to the Policy Statement, the report discusses how the policies of this statement relate to other NRC programs including the Severe Accident Research Program; the implementation of safety measures resulting from lessons learned in the accident at Three Mile Island; safety goal development; the resolution of Unresolved Safety Issues and other Generic Safety Issues; and possible revisions of rules or regulatory requirements resulting from the Severe Accident Source Term Program. Also discussed are the main features of a generic decision strategy for resolving Regulatory Questions and Technical Issues relating to severe accidents; the development and regulatory use of new safety information; the treatment of uncertainty in severe accident decision making; and the development and implementation of a Systems Reliability Program for both existing and future plants to ensure that the realized level of safety is commensurate with the safety analyses used in regulatory decisions

  19. Safety Second: the NRC and America's nuclear power plants

    International Nuclear Information System (INIS)

    Adato, M.; MacKenzie, J.; Pollard, R.; Weiss, E.

    1987-01-01

    In 1975, Congress created the Nuclear Regulatory Commission (NRC). Its primary responsibility was to be the regulation of the nuclear power industry in order to maintain public health and safety. On March 28, 1979, in the worst commercial nuclear accident in US history, the plant at Three Mile Island began to leak radioactive material. How was Three Mile Island possible? Where was the NRC? This analysis by the Union of Concerned Scientists (UCS) of the NRC's first decade, points specifically to the factors that contributed to the accident at Three Mile Island. The NRC, created as a watchdog of the nuclear power industry, suffers from problems of mindset, says the UCS. The commission's problems are political, not technical; it repeatedly ranks special interests above the interest of public safety. This book critiques the NRC's performance in four specific areas. It charges that the agency has avoided tackling the most pervasive safety issues; has limited public participation in decision making and power plant licensing; has failed to enforce safety standards or conduct adequate regulation investigations; and, finally, has maintained a fraternal relationship with the industry it was created to regulate, serving as its advocate rather than it adversary. The final chapter offers recommendations for agency improvement that must be met if the NRC is to fulfill its responsibility for safety first

  20. 75 FR 28073 - Draft Regulatory Guide: Issuance, Availability

    Science.gov (United States)

    2010-05-19

    ... ``Regulatory Guides'' collection of the NRC's Electronic Reading Room at http://www.nrc.gov/reading-rm/doc... NUCLEAR REGULATORY COMMISSION [NRC-2010-0181] Draft Regulatory Guide: Issuance, Availability... Guide, DG-3039, ``Standard Format and Content for Emergency Plans for Fuel Cycle and Materials...

  1. 75 FR 45166 - Draft Regulatory Guide: Issuance, Availability

    Science.gov (United States)

    2010-08-02

    ... ``Regulatory Guides'' collection of the NRC's Electronic Reading Room at http://www.nrc.gov/reading-rm/doc... NUCLEAR REGULATORY COMMISSION [NRC-2010-0265] Draft Regulatory Guide: Issuance, Availability... Guide, DG-3030, ``Nuclear Criticality Safety Standards for Fuels and Material Facilities.'' [[Page 45167...

  2. 75 FR 62893 - Draft Regulatory Guide: Issuance, Availability

    Science.gov (United States)

    2010-10-13

    ... the ``Regulatory Guides'' collection of the NRC's Electronic Reading Room at http://www.nrc.gov... NUCLEAR REGULATORY COMMISSION [NRC-2010-0321] Draft Regulatory Guide: Issuance, Availability... Guide, DG-1196, ``Qualification for Cement Grouting for Prestressing Tendons in Containment Structures...

  3. 76 FR 20052 - Notice of Issuance of Regulatory Guide

    Science.gov (United States)

    2011-04-11

    ... the NRC's public Web site under ``Regulatory Guides'' at http://www.nrc.gov/reading-rm/doc-collections... NUCLEAR REGULATORY COMMISSION [NRC-2010-0187] Notice of Issuance of Regulatory Guide AGENCY... Guide 1.149, ``Nuclear Power Plant Simulation Facilities for Use in Operator Training, License...

  4. 75 FR 58444 - Draft Regulatory Guide: Issuance, Availability

    Science.gov (United States)

    2010-09-24

    ... ``Regulatory Guides'' collection of the NRC's Electronic Reading Room at http://www.nrc.gov/reading-rm/doc... NUCLEAR REGULATORY COMMISSION [NRC-2010-0305] Draft Regulatory Guide: Issuance, Availability... Guide, DG-1244, ``Availability of Electric Power Sources.'' FOR FURTHER INFORMATION CONTACT: Satish...

  5. 75 FR 29785 - Draft Regulatory Guide: Issuance, Availability

    Science.gov (United States)

    2010-05-27

    ... ``Regulatory Guides'' collection of the NRC's Electronic Reading Room at http://www.nrc.gov/reading-rm/doc... NUCLEAR REGULATORY COMMISSION [NRC-2010-0187] Draft Regulatory Guide: Issuance, Availability... Guide, DG-1248, ``Nuclear Power Plant Simulation Facilities for Use in Operator Training, License...

  6. The role of research in nuclear regulation: An NRC perspective

    International Nuclear Information System (INIS)

    Morrison, D.L.

    1997-01-01

    The role of research in the US Nuclear Regulatory Commission was broadly defined by the US Congress in the Energy Reorganization Act of 1975. This Act empowered the Commission to do research that it deems necessary for the performance of its licensing and regulatory functions. Congress cited a need for an independent capability that would support the licensing and regulatory process through the development and analysis of technical information related to reactor safety, safeguards and environmental protection. Motivation for establishing such a safety research function within the regulatory agency is the need to address the defects, abnormal occurrences and shutdowns involving light water reactors. Congress further stated that the NRC should limit its research to open-quotes confirmatory assessmentclose quotes and that the Agency open-quotes should never be placed in a position to generate, and then have to defend, basic design data of its own.close quotes The author reviews the activities of the research arm as related to regulatory research, performed in the past, today, and projected for the future. NRC's public health and safety mission demands that its research products be developed independently from its licensees; be credible and of the highest technical quality as established through peer review; and open to the public scrutiny through publication in technical journals as well as NRC documents. A special trust is placed on regulatory research through the products it produces as well as the three dimensions that underlie the processes through which they are produced

  7. Staged licensing: An essential element of the NRC's revised regulations

    International Nuclear Information System (INIS)

    Echols, F.S.

    1997-01-01

    Over the past several years, Congress has directed the Department of Energy (DOE), the Nuclear Regulatory Commission (NRC), and the Environmental Protection Agency (EPA) to abandon their efforts to assess an array of potential candidate geologic repository sites for the permanent disposal of spent nuclear reactor fuel and high level radioactive waste, to develop generally applicable requirements for licensing geologic repositories, and to develop generally applicable radiation protection standards for geologic repositories, and instead to focus their efforts to determine whether a single site located at Yucca Mountain, Nevada can be developed as a geologic repository which providing reasonable assurance that public health and safety and the environment will be adequately protected. If the Yucca Mountain site is found to be suitable for development as a geologic repository, then at each stage of development DOE will have to provide the NRC with progressively more detailed information regarding repository design and long-term performance. NRC regulations reflect the fact that it will not be until the repository has been operated for a number of years that the NRC will be able to make a final determination as to long-term repository performance. Nevertheless, the NRC will be able to allow DOE to construct and operate a repository, provided that the NRC believes that the documented results of existing studies, together with the anticipated results from continuing and future studies, will enable the NRC to make a final determination that it has reasonable assurance that the repository system's long-term performance will not cause undue risk to the public. Thus, in its efforts to revise its current regulations to assure that the technical criteria are specifically applicable to the Yucca Mountain site, the NRC should also make sure that it preserves and clarifies the concept of staged repository development

  8. Agenda 21

    OpenAIRE

    Nascimento, Daniel Trento do

    2003-01-01

    Dissertação (mestrado) - Universidade Federal de Santa Catarina, Centro Sócio-Econômico. Programa de Pós-Graduação em Administração. Agenda 21 é o resultado mais palpável do encontro realizado no Rio de Janeiro em 1992, chamado de ECO-92 ou RIO-92. Nesse encontro, mais de 170 países assinaram um acordo de propagar e implantar um plano global visando o desenvolvimento sustentável, que foi chamado de Agenda 21. Para tanto, a efetividade desse plano está fortemente ligada a capacidade de abso...

  9. Low-level mixed waste: An RCRA perspective for NRC licensees

    International Nuclear Information System (INIS)

    1990-08-01

    The publication presents an overview of RCRA requirements for commercially-generated low-level mixed waste. It is designed for Nuclear Regulatory Commission (NRC) licensees who may not be familiar with EPA regulations that apply to their waste products

  10. Reassessment of the NRC`s program for protecting allegers against retaliation

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-01

    On July 6, 1993, the Nuclear Regulatory Commission`s (NRC`s) Executive Director for Operations established a review team to reassess the NRC`s program for protecting allegers against retaliation. The team evaluated the current system, and solicited comments from various NRC offices, other Federal agencies, licensees, former allegers, and the public. This report is subject to agency review. The report summarizes current processes and gives an overview of current problems. It discusses: (1) ways in which licensees can promote a quality-conscious work environment, in which all employees feel free to raise concerns without fear of retaliation; (2) ways to improve the NRC`s overall handling of allegations; (3) the NRC`s involvement in the Department of Labor process; (4) related NRC enforcement practices; and (5) methods other than investigation and enforcement that may be useful in treating allegations of potential or actual discrimination. Recommendations are given in each area.

  11. NRC plan for cleanup operations at Three Mile Island Unit 2

    International Nuclear Information System (INIS)

    Lo, R.; Snyder, B.

    1982-02-01

    This NRC Plan, which defines NRC's functional role in cleanup operations at Three Mile Island Unit 2 and outlines NRC's regulatory responsibilities in fulfilling this role, is the first revision to the initial plan issued in July 1980 (NUREG-0698). Since 1980, a number of policy developments have occurred which will have an impact on the course of cleanup operations. This revision reflects these developments in the area of NRC's review and approval process with regard to cleanup operations as well as NRC's interface with the Department of Energy's involvement in the cleanup and waste disposal. This revision is also intended to update the cleanup schedule by presenting the cleanup progress that has taken place and NRC's role in ongoing and future cleanup activities

  12. 75 FR 52999 - Notice of Issuance of Regulatory Guide

    Science.gov (United States)

    2010-08-30

    ... site under ``Regulatory Guides'' at http://www.nrc.gov/reading-rm/doc-collections/ . In addition... NUCLEAR REGULATORY COMMISSION [NRC-2009-0556] Notice of Issuance of Regulatory Guide AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Regulatory Guide 8.35...

  13. 75 FR 16202 - Notice of Issuance of Regulatory Guide

    Science.gov (United States)

    2010-03-31

    ... Guides'' at http://www.nrc.gov/reading-rm/doc-collections/ . In addition, regulatory guides are available... NUCLEAR REGULATORY COMMISSION [NRC-2008-0644] Notice of Issuance of Regulatory Guide AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Regulatory Guide (RG) 1.126...

  14. 75 FR 37842 - Notice of Issuance of Regulatory Guide

    Science.gov (United States)

    2010-06-30

    ... site under ``Regulatory Guides'' at http://www.nrc.gov/reading-rm/doc-collections/ . In addition... NUCLEAR REGULATORY COMMISSION [NRC-2009-0396] Notice of Issuance of Regulatory Guide AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Regulatory Guide 2.5...

  15. 76 FR 24539 - Final Regulatory Guide: Issuance, Availability

    Science.gov (United States)

    2011-05-02

    ... site under ``Regulatory Guides'' at http://www.nrc.gov/reading-rm/doc-collections/ . Electronic copies... NUCLEAR REGULATORY COMMISSION [NRC-2010-0181] Final Regulatory Guide: Issuance, Availability AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Regulatory Guide...

  16. 75 FR 16525 - Notice of Issuance of Regulatory Guide

    Science.gov (United States)

    2010-04-01

    ... http://www.nrc.gov/reading-rm/doc-collections/ . In addition, regulatory guides are available for... NUCLEAR REGULATORY COMMISSION [NRC-2009-0413] Notice of Issuance of Regulatory Guide AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Regulatory Guide 1.11...

  17. 75 FR 27599 - Notice of Issuance of Regulatory Guide

    Science.gov (United States)

    2010-05-17

    ...'' at http://www.nrc.gov/reading-rm/doc-collections/ . In addition, regulatory guides are available for... NUCLEAR REGULATORY COMMISSION [NRC-2009-0492] Notice of Issuance of Regulatory Guide AGENCY: Nuclear Regulatory Commission. ACTION: Notice of issuance and availability of Regulatory Guide 6.7...

  18. USA NRC/RSR Data Bank System and Reactor Safety Research Data Repository (RSRDR)

    International Nuclear Information System (INIS)

    Maskewitz, B.F.; Bankert, S.F.

    1979-01-01

    The United States Nuclear Regulatory Commission (NRC), through its Division of Reactor Safety Research (RSR) of the Office of Nuclear Regulatory Research, has established the NRC/RSR Data Bank Program to collect, process, and make available data from the many domestic and foreign water reactor safety research programs. An increasing number of requests for data and/or calculations generated by NRC Contractors led to the initiation of the program which allows timely and direct access to water reactor safety data in a manner most useful to the user. The program consists of three main elements: data sources, service organizations, and a data repository

  19. Initial experience with the NRC significance determination process

    Energy Technology Data Exchange (ETDEWEB)

    Madison, A.L. [Office of Nuclear Reactor Regulation, US Nuclear Regulatory Commission (United States)

    2001-07-01

    The U.S. Nuclear Regulatory Commission (NRC) has revamped its inspection, assessment, and enforcement programs for commercial nuclear power plants. The new oversight process uses more objective, timely, and safety-significant criteria in assessing performance, while seeking to more effectively and efficiently regulate the industry. The NRC tested the new process at thirteen reactors at nine sites across the country on a pilot basis in 1999 to identify what things worked well and what improvements were called for before beginning Initial Implementation at all US nuclear power plants on April 2, 2000. After a year of experience has been gained with the new oversight process at all US plants, the NRC anticipates making further improvements based on this wider experience. (author)

  20. Coupled processes in NRC high-level waste research

    International Nuclear Information System (INIS)

    Costanzi, F.A.

    1987-01-01

    The author discusses NRC research effort in support of evaluating license applications for disposal of nuclear waste and for promulgating regulations and issuing guidance documents on nuclear waste management. In order to do this they fund research activities at a number of laboratories, academic institutions, and commercial organizations. One of our research efforts is the coupled processes study. This paper discusses interest in coupled processes and describes the target areas of research efforts over the next few years. The specific research activities relate to the performance objectives of NRC's high-level waste (HLW) regulation and the U.S. Environmental Protection Agency (EPA) HLW standard. The general objective of the research program is to ensure the NRC has a sufficient independent technical base to make sound regulatory decisions

  1. Congress, NRC mull utility access to FBI criminal files

    International Nuclear Information System (INIS)

    Ultroska, D.

    1984-01-01

    Experiences at Alabama Power Company and other nuclear utilities have promped a request for institutionalizing security checks of personnel in order to eliminated convicted criminals and drug users. The Nuclear Regulatory Commission (NRC), which could provide FBI criminal history information by submitting fingerprints, does not do so, and would require new legislation to take on that duty. Believing that current malevolent employees can be managed with existing procedures, NRC allows criminal background checks only on prospective employees in order to avoid a negative social impact on personnel. Legislation to transfer criminal histories to nuclear facilities is now pending, and NRC is leaning toward a request for full disclosure, partly because of terrorist threats and partly to save manpower time and costs in reviewing case histories

  2. Initial experience with the NRC significance determination process

    International Nuclear Information System (INIS)

    Madison, A.L.

    2001-01-01

    The U.S. Nuclear Regulatory Commission (NRC) has revamped its inspection, assessment, and enforcement programs for commercial nuclear power plants. The new oversight process uses more objective, timely, and safety-significant criteria in assessing performance, while seeking to more effectively and efficiently regulate the industry. The NRC tested the new process at thirteen reactors at nine sites across the country on a pilot basis in 1999 to identify what things worked well and what improvements were called for before beginning Initial Implementation at all US nuclear power plants on April 2, 2000. After a year of experience has been gained with the new oversight process at all US plants, the NRC anticipates making further improvements based on this wider experience. (author)

  3. Nuclear Regulatory Commission information digest

    International Nuclear Information System (INIS)

    1990-03-01

    The Nuclear Regulatory Commission information digest provides summary information regarding the US Nuclear Regulatory Commission, its regulatory responsibilities, and areas licensed by the commission. This is an annual publication for the general use of the NRC Staff and is available to the public. The digest is divided into two parts: the first presents an overview of the US Nuclear Regulatory Commission and the second provides data on NRC commercial nuclear reactor licensees and commercial nuclear power reactors worldwide

  4. NRC safety research in support of regulation, 1986

    International Nuclear Information System (INIS)

    1987-09-01

    This report is the second in a series of annual reports responding to congressional inquiries as to the utilization of nuclear regulatory research. NUREG-1175, ''NRC Safety Research in Support of Regulation,'' published in May 1986, reported major research accomplishments between about FY 1980 and FY 1985. This report narrates the accomplishments of FY 1986 and does not restate earlier accomplishments. Earlier research results are mentioned in the context of current results in the interest of continuity. Both the direct contributions to scientific and technical knowledge and their regulatory applications, when there has been a definite regulatory outcome during FY 1986, have been described

  5. Software for automated tracking of open items at NRC

    International Nuclear Information System (INIS)

    DeWispelare, A.R.; Mackin, P.C.; Johnson, R.L.

    1995-01-01

    The Open Item Tracking System (OITS) was developed in response to the Nuclear Regulatory Commission (NRC) need for a reliable, easy to use automated database system, to track all open (awaiting resolution) items related to regulatory, institutional, and technical uncertainties for the Department of Energy's (DOE's) high-level waste (HLW) disposal program. The OITS system was integrated with the Regulatory Program Database (RPD) Version 1.1, resulting in the RPD/OITS Version 2.0 system. RPD/OITS is a network bases system with client server architecture and a graphical user interface. This paper outlines the system and results of its implementation

  6. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1982-07-01

    Effective January 1, 1982, NRC will institute records retention and disposal practices in accordance with the approved Comprehensive Records Disposition Schedule (CRDS). CRDS is comprised of NRC Schedules (NRCS) 1 to 4 which apply to the agency's program or substantive records and General Records Schedules (GRS) 1 to 22 which apply to housekeeping or facilitative records. The schedules are assembled functionally/organizationally to facilitate their use. Preceding the records descriptions and disposition instructions for both NRCS and GRS, there are brief statements on the organizational units which accumulate the records in each functional area, and other information regarding the schedules' applicability

  7. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1983-05-01

    Effective January 1, 1982, NRC will institute records retention and disposal practives in accordance with the approved Comprehensive Records Disposition Schedule (CRDS). CRDS is comprised of NRC Schedules (NRCS) 1 to 4 which apply to the agency's program or substantive records and General Records Schedules (GRS) 1 to 24 which apply to housekeeping or facilitative records. NRCS-I applies to records common to all or most NRC offices; NRCS-II applies to program records as found in the various offices of the Commission, Atomic Safety and Licensing Board Panel, and the Atomic Safety and Licensing Appeal Panel; NRCS-III applies to records accumulated by the Advisory Committee on Reactor Safeguards; and NRCS-IV applies to records accumulated in the various NRC offices under the Executive Director for Operations. The schedules are assembled functionally/organizationally to facilitate their use. Preceding the records descriptions and disposition instructions for both NRCS and GRS, there are brief statements on the organizational units which accumulate the records in each functional area, and other information regarding the schedules' applicability

  8. NRC ARDC Guidance Support Status Report

    Energy Technology Data Exchange (ETDEWEB)

    Holbrook, Mark R. [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2017-07-01

    This report provides a summary that reflects the progress and status of proposed regulatory design criteria for advanced non-light water reactor (LWR) designs in accordance with the Level 3 milestone M3AT-17IN2001013 in work package AT-17IN200101. These criteria have been designated as advanced reactor design criteria (ARDC) and they provide guidance to future applicants for addressing the general design criteria (GDC) that are currently applied specifically to LWR designs. This report provides a summary of Phase 2 activities related to the various tasks associated with ARDC development and the subsequent development of ARDC regulatory guidance for sodium fast reactor (SFR) and modular high-temperature gas-cooled reactor (HTGR) designs. Status Report Organization: Section 2 discusses the origin of the GDC and their application to LWRs. Section 3 addresses the objective of this initiative and how it benefits the advanced non-LWR reactor vendors. Section 4 discusses the scope and structure of the initiative. Section 5 provides background on the U.S. Department of Energy (DOE) ARDC team’s original development of the proposed ARDC that were submitted to the NRC for consideration. Section 6 provides a summary of recent ARDC Phase 2 activities. Appendices A through E document the DOE ARDC team’s public comments on various sections of the NRC’s draft regulatory guide DG–1330, “Guidance for Developing Principal Design Criteria for Non-Light Water Reactors.”

  9. NRC ARDC Guidance Support Status Report

    International Nuclear Information System (INIS)

    Holbrook, Mark R.

    2017-01-01

    This report provides a summary that reflects the progress and status of proposed regulatory design criteria for advanced non-light water reactor (LWR) designs in accordance with the Level 3 milestone M3AT-17IN2001013 in work package AT-17IN200101. These criteria have been designated as advanced reactor design criteria (ARDC) and they provide guidance to future applicants for addressing the general design criteria (GDC) that are currently applied specifically to LWR designs. This report provides a summary of Phase 2 activities related to the various tasks associated with ARDC development and the subsequent development of ARDC regulatory guidance for sodium fast reactor (SFR) and modular high-temperature gas-cooled reactor (HTGR) designs. Status Report Organization: Section 2 discusses the origin of the GDC and their application to LWRs. Section 3 addresses the objective of this initiative and how it benefits the advanced non-LWR reactor vendors. Section 4 discusses the scope and structure of the initiative. Section 5 provides background on the U.S. Department of Energy (DOE) ARDC team’s original development of the proposed ARDC that were submitted to the NRC for consideration. Section 6 provides a summary of recent ARDC Phase 2 activities. Appendices A through E document the DOE ARDC team’s public comments on various sections of the NRC’s draft regulatory guide DG–1330, “Guidance for Developing Principal Design Criteria for Non-Light Water Reactors.”

  10. NRC Licensing Status Summary Report for NGNP

    Energy Technology Data Exchange (ETDEWEB)

    Moe, Wayne Leland [Idaho National Lab. (INL), Idaho Falls, ID (United States); Kinsey, James Carl [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-11-01

    The Next Generation Nuclear Plant (NGNP) Project, initiated at Idaho National Laboratory (INL) by the U.S. Department of Energy (DOE) pursuant to provisions of the Energy Policy Act of 2005, is based on research and development activities supported by the Department of Energy Generation IV Nuclear Energy Systems Initiative. The principal objective of the NGNP Project is to support commercialization of high temperature gas-cooled reactor (HTGR) technology. The HTGR is a helium-cooled and graphite moderated reactor that can operate at temperatures much higher than those of conventional light water reactor (LWR) technologies. The NGNP will be licensed for construction and operation by the Nuclear Regulatory Commission (NRC). However, not all elements of current regulations (and their related implementation guidance) can be applied to HTGR technology at this time. Certain policies established during past LWR licensing actions must be realigned to properly accommodate advanced HTGR technology. A strategy for licensing HTGR technology was developed and executed through the cooperative effort of DOE and the NRC through the NGNP Project. The purpose of this report is to provide a snapshot of the current status of the still evolving pre-license application regulatory framework relative to commercial HTGR technology deployment in the U.S. The following discussion focuses on (1) describing what has been accomplished by the NGNP Project up to the time of this report, and (2) providing observations and recommendations concerning actions that remain to be accomplished to enable the safe and timely licensing of a commercial HTGR facility in the U.S.

  11. NRC safety research in support of regulation - FY 1994. Volume 9

    International Nuclear Information System (INIS)

    1995-06-01

    This report, the tenth in a series of annual reports, was prepared in response to congressional inquiries concerning how nuclear regulatory research is used. It summarizes the accomplishments of the Office of Nuclear Regulatory Research during FY 1994. The goal of the Office of Nuclear Regulatory Research (RES) is to ensure the availability of sound technical bases for timely rulemaking and related decisions in support of NRC regulatory/licensing/inspection activities. RES also has responsibilities related to the resolution of generic safety issues and to the review of licensee submittals regarding individual plant examinations. It is the responsibility of RES to conduct the NRC's rulemaking process, including the issuance of regulatory guides and rules that govern NRC licensed activities

  12. Current perspectives on performance assessment at the NRC

    International Nuclear Information System (INIS)

    Coplan, S.M.; Eisenberg, N.A.; Federline, M.V.; Randall, J.D.

    1992-01-01

    The Nuclear Regulatory Commission (NRC) staff is engaging in a number of activities involving performance assessment in order to support NRC's program in high-level waste management. Broad areas of activity include: (1) reactive work responding to products and activities of the Department of Energy (DOE), (2) proactive work, including development of an independent performance assessment capability, development of guidance for DOE, support for technical and programmatic integration, (3) a program of regulatory research, and (4) participation in a number of international activities. As the U.S. high-level waste program continues to mature, performance assessment is seen as playing a more prominent role in evaluating safety and focussing technical activities

  13. Recommendations for NEAMS Engagement with the NRC: Preliminary Report

    International Nuclear Information System (INIS)

    Bernholdt, David E.

    2012-01-01

    The vision of the Nuclear Energy Advanced Modeling and Simulation (NEAMS) program is to bring a new generation of analytic tools to the nuclear engineering community in order to facilitate students, faculty, industry and laboratory researchers in investigating advanced reactor and fuel cycle designs. Although primarily targeting at advance nuclear technologies, it is anticipated that these new capabilities will also become interesting and useful to the nuclear regulator Consequently, the NEAMS program needs to engage with the Nuclear Regulatory Commission as the software is being developed to ensure that they are familiar with and ready to respond to this novel approach when the need arises. Through discussions between key NEAMS and NRC staff members, we tentatively recommend annual briefings to the Division of Systems Analysis in the NRC's Office of Nuclear Regulatory Research. However the NEAC subcommittee review of the NEAMS program may yield recommendations that would need to be considered before finalizing this plan.

  14. Recommendations for NEAMS Engagement with the NRC: Preliminary Report

    Energy Technology Data Exchange (ETDEWEB)

    Bernholdt, David E [ORNL

    2012-06-01

    The vision of the Nuclear Energy Advanced Modeling and Simulation (NEAMS) program is to bring a new generation of analytic tools to the nuclear engineering community in order to facilitate students, faculty, industry and laboratory researchers in investigating advanced reactor and fuel cycle designs. Although primarily targeting at advance nuclear technologies, it is anticipated that these new capabilities will also become interesting and useful to the nuclear regulator Consequently, the NEAMS program needs to engage with the Nuclear Regulatory Commission as the software is being developed to ensure that they are familiar with and ready to respond to this novel approach when the need arises. Through discussions between key NEAMS and NRC staff members, we tentatively recommend annual briefings to the Division of Systems Analysis in the NRC's Office of Nuclear Regulatory Research. However the NEAC subcommittee review of the NEAMS program may yield recommendations that would need to be considered before finalizing this plan.

  15. IRIS and the National Research Council (NRC)

    Science.gov (United States)

    Since the 2011 National Academies’ National Research Council (NRC) review of the IRIS Program's assessment of Formaldehyde, EPA and NRC have had an ongoing relationship into the improvements of developing the IRIS Assessments.

  16. NRC TLD Direct Radiation Monitoring Network

    International Nuclear Information System (INIS)

    Struckmeyer, R.; McNamara, N.

    1991-12-01

    This report provides the status and results of the NRC Thermoluminescent Dosimeter (TLD) Direct Radiation Monitoring Network. It presents the radiation levels measured in the vicinity of NRC licensed facilities throughout the country for the third quarter of 1991

  17. NRC safety research in support of regulation. Selected highlights

    International Nuclear Information System (INIS)

    1986-05-01

    The report presents selected highlights of how research has contributed to the regulatory effort. It explains the research role of the NRC and nuclear safety research contributions in the areas of: pressure vessel integrity, piping, small- and large-break loss-of-coolant accidents, hydrogen and containment, source term analysis, seismic hazards and high-level waste management. The report also provides a summary of current and future research directions in support of regulation

  18. NRC Enforcement Policy Review, July 1995-July 1997

    International Nuclear Information System (INIS)

    Lieberman, J.; Pedersen, R.M.

    1998-04-01

    On June 30, 1995, the Nuclear Regulatory Commission (NRC) issued a complete revision of its General Statement of Policy and Procedure for Enforcement Action (Enforcement Policy) (60 FR 34381). In approving the 1995 revision to the Enforcement Policy, the Commission directed the staff to perform a review of its implementation of the Policy after approximately 2 years of experience and to consider public comments. This report represents the results of that review

  19. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1992-03-01

    Title 44 United States Code, ''Public Printing and Documents,'' regulations cited in the General Services Administration's (GSA) ''Federal Information Resources Management Regulations'' (FIRMR), Part 201-9, ''Creation, Maintenance, and Use of Records,'' and regulation issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter XII, Subchapter B, ''Records Management,'' require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA's General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate duration of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 2, contains ''NRC's Comprehensive Records Disposition Schedule,'' and the original authorized approved citation numbers issued by NARA. Rev. 2 totally reorganizes the records schedules from a functional arrangement to an arrangement by the host office. A subject index and a conversion table have also been developed for the NRC schedules to allow staff to identify the new schedule numbers easily and to improve their ability to locate applicable schedules

  20. The NRC weighs public input on plant cleanup standards

    International Nuclear Information System (INIS)

    Simpson, J.

    1993-01-01

    In the wake of seven public open-quotes work-shopsclose quotes held around the country over the past several months, the Nuclear Regulatory Commission (NRC) is preparing to develop radiological criteria for decommissioning nuclear power plants. The criteria will apply to plants that operate for their normal lifespan, those that shut down prematurely, as well as a range of other NRC-licensed facilities, including materials licensees, fuel reprocessing and fabrication plants, and independent spent fuel storage installations. The criteria have been years in the making, and their progress is being monitored closely by the Environmental Protection Agency (EPA), which shares with the NRC the authority to regulate radiological hazards. Both agencies have made abortive attempts to promulgate standards in the past. The EPA's most recent proposal, dating from 1986, has yet to reach the final rule stage. The NCRC's 1990 policy statement, open-quotes Below Regulatory Concern,close quotes was overturned by the Energy Policy Act of 1992, a setback that prompted the Commission's call for open-quotes enhanced participatory rulemakingclose quotes-a.k.a., public meetings-last December. In its Rulemaking Issues Paper, the NRC outlined for discussion four open-quotes fundamentalclose quotes objectives as a basis for developing decommissioning criteria: (1) establishing limits above which the risks to the public are deemed open-quotes unacceptableclose quotes; (2) establishing open-quotes goalsclose quotes below which the risks to the public are deemed open-quotes trivialclose quotes; (3) establishing criteria for what is achievable using the open-quotes best availableclose quotes cleanup technology; and (4) removing all radioactivity attributable to plant activity. The NRC expects to publish a proposed rule and a draft generic environmental impact statement in April 1994; the final rule is scheduled for May 1995

  1. NRC perspectives on the digital system review process

    International Nuclear Information System (INIS)

    Mauck, J.L.

    1998-01-01

    Since about 1988, the USNRC has been involved in the review of digital retrofits to instrumentation and control (I and C) systems in nuclear power plants. Initially, this involvement was limited but with the advent of the 1990s, NRC involvement has become greater because of increased interest in and application of digital systems as existing analog systems become obsolete. Criteria for the design of such systems to ensure safety has been promulgated over the years and the USNRC has been actively involved both nationally and internationally with this effort. With the publication of the Zion Eagle 21 Safety Evaluation Report in 1992, Generic Letter 95-02 in April 1995 which endorses EPRI guidance document TR-102348 on digital upgrades and the latest revision to Regulatory Guide 1.152 which endorses IEEE 7.4.3.2-1993; a basic digital system review process was established. The NRC supplemented this review process with recently issued inspection procedures for use by NRC inspectors when conducting onsite reviews of digital modifications. In addition, the NRC undertook a major effort to codify the above guidance and the experience gained from digital system reviews of both operating plant modifications and advanced reactor designs, over these years into a revision to Standard Review Plan, (SRP), NUREG-0800, Chapter 7, Instrumentation and Control. This SRP revision was published in June, 1997, and included new SRP sections, branch technical positions and six new regulatory guides endorsing IEEE standards on software quality. The NRC staff believes that a stable digital system review process is now in place. (author)

  2. 76 FR 35922 - Notice of Issuance of Regulatory Guide

    Science.gov (United States)

    2011-06-20

    .... Proposed Revision 1 of Regulatory Guide (RG) 8.4, ``Personnel Monitoring Device--Direct-Reading Pocket...'' at http://www.nrc.gov/reading-rm/doc-collections/ . In addition, regulatory guides are available for... NUCLEAR REGULATORY COMMISSION [NRC-2010-0148] Notice of Issuance of Regulatory Guide AGENCY...

  3. Building confidence in nuclear waste regulation: how NRC is adapting in response to stakeholder concerns

    International Nuclear Information System (INIS)

    Kotra, Janet P.

    2004-01-01

    Increasing public confidence in the U.S. Nuclear Regulatory Commission as an effective and independent regulator is an explicit goal of the Agency. When developing new, site-specific regulations for the proposed geologic repository at Yucca Mountain, Nevada, NRC sought to improve its efforts to inform and involve the public in NRC's decision-making process. To this end, NRC has made, and continues to make significant organizational, process and policy changes. NRC successfully applied these changes as it completed final regulations for Yucca Mountain, when introducing a draft license review plan for public comment, and when responding to public requests for information on NRC's licensing and hearing process. It should be understood, however, that these changes emerged, and continue to be applied, in the context of evolving agency concern for increasing stakeholder confidence reflected in institutional changes within the agency as a whole. (author)

  4. Development of the NRC`s Human Performance Investigation Process (HPIP). Volume 3, Development documentation

    Energy Technology Data Exchange (ETDEWEB)

    Paradies, M.; Unger, L. [System Improvements, Inc., Knoxville, TN (United States); Haas, P.; Terranova, M. [Concord Associates, Inc., Knoxville, TN (United States)

    1993-10-01

    The three volumes of this report detail a standard investigation process for use by US Nuclear Regulatory Commission (NRC) personnel when investigating human performance related events at nuclear power plants. The process, called the Human Performance Investigation Process (HPIP), was developed to meet the special needs of NRC personnel, especially NRC resident and regional inspectors. HPIP is a systematic investigation process combining current procedures and field practices, expert experience, NRC human performance research, and applicable investigation techniques. The process is easy to learn and helps NRC personnel perform better field investigations of the root causes of human performance problems. The human performance data gathered through such investigations provides a better understanding of the human performance issues that cause events at nuclear power plants. This document, Volume III, is a detailed documentation of the development effort and the pilot training program.

  5. Nuclear Regulatory Commission Information Digest, 1991 edition

    International Nuclear Information System (INIS)

    Olive, K.L.

    1991-03-01

    The Nuclear Regulatory Commission Information Digest provides a summary of information about the US Nuclear Regulatory Commission (NRC), NRC's regulatory responsibilities, and the areas NRC licenses. This digest is a compilation of NRC-related data and is designed to provide a quick reference to major facts about the agency and the industry it regulates. In general, the data cover 1975 through 1990, with exceptions noted. For operating US commercial nuclear power reactors, information on generating capacity and average capacity factor is obtained from Monthly Operating Reports submitted to the NRC directly by the licensee. This information is reviewed for consistency only. No independent validation and/or verification is performed by the NRC. For detailed and complete information about tables and figures, refer to the source publications. This digest is published annually for the general use of the NRC staff and is available to the public. 30 figs., 12 tabs

  6. Applications of probabilistic techniques at NRC

    International Nuclear Information System (INIS)

    Thadani, A.; Rowsome, F.; Speis, T.

    1984-01-01

    The NRC is currently making extensive use of probabilistic safety assessment in the reactor regulation. Most of these applications have been introduced in the regulatory activities in the past few years. Plant Probabilistic Safety Studies are being utilized as a design tool for applications for standard designs and for assessment of plants located in regions of particularly high population density. There is considerable motivation for licenses to perform plant-specific probabilistic studies for many, if not all, of the existing operating nuclear power plants as a tool for prioritizing the implementation of the many outstanding licensing actions of these plants as well as recommending the elimination of a number of these issues which are judged to be insignificant in terms of their contribution to safety and risk. Risk assessment perspectives are being used in the priorization of generic safety issues, development of technical resolution of unresolved safety issues, assessing safety significance of proposed new regulatory requirements, assessment of safety significance of some of the occurrences at operating facilities and in environmental impact analyses of license applicants as required by the National Environmental Policy Act. (orig.)

  7. 75 FR 10526 - In the Matter of Mr. Lawrence E. Grimm; Order Prohibiting Involvement in NRC-Licensed Activities

    Science.gov (United States)

    2010-03-08

    ... NUCLEAR REGULATORY COMMISSION [IA-09-068; NRC-2010-0085] In the Matter of Mr. Lawrence E. Grimm; Order Prohibiting Involvement in NRC-Licensed Activities I Mr. Lawrence E. Grimm was employed as a... NIST-Boulder facility in accordance with the conditions specified therein. Mr. Grimm was listed on the...

  8. Plan for reevaluation of NRC policy on decommissioning of nuclear facilities

    International Nuclear Information System (INIS)

    1978-03-01

    Recognizing that the current generation of large commercial reactors and supporting nuclear facilities would substantially increase future decommissioning needs, the NRC staff began an in-depth review and re-evaluation of NRC's regulatory approach to decommissioning in 1975. Major technical studies on decommissioning have been initiated at Battelle Pacific Northwest Laboratory in order to provide a firm information base on the engineering methodology, radiation risks, and estimated costs of decommissioning light water reactors and associated fuel cycle facilities. The Nuclear Regulatory Commission is now considering development of a more explicit overall policy for nuclear facility decommissioning and amending its regulations in 10 CFR Parts 30, 40, 50, and 70 to include more specific guidance on decommissioning criteria for production and utilization facility licensees and byproduct, source, and special nuclear material licensees. The report sets forth in detail the NRC staff plan for the development of an overall NRC policy on decommissioning of nuclear facilities

  9. Pilot program: NRC severe reactor accident incident response training manual. Overview and summary of major points

    International Nuclear Information System (INIS)

    McKenna, T.J.; Martin, J.A. Jr.; Giitter, J.G.; Miller, C.W.; Hively, L.M.; Sharpe, R.W.; Watkins

    1987-02-01

    Overview and Summary of Major Points is the first in a series of volumes that collectively summarize the U.S. Nuclear Regulatory Commission (NRC) emergency response during severe power reactor accidents and provide necessary background information. This volume describes elementary perspectives on severe accidents and accident assessment. Other volumes in the series are: Volume 2-Severe Reactor Accident Overview; Volume 3- Response of Licensee and State and Local Officials; Volume 4-Public Protective Actions-Predetermined Criteria and Initial Actions; Volume 5 - U.S. Nuclear Regulatory Commission. Each volume serves, respectively, as the text for a course of instruction in a series of courses for NRC response personnel. These materials do not provide guidance or license requirements for NRC licensees. The volumes have been organized into these training modules to accommodate the scheduling and duty needs of participating NRC staff. Each volume is accompanied by an appendix of slides that can be used to present this material

  10. Update of NRC uranium mill licensing activities

    International Nuclear Information System (INIS)

    Martin, J.B.

    1978-01-01

    Increased vigilance must be given to controlling emissions from active milling operations, particularly windblown tailings, to assure that the soon-to-be-effective EPA Fuel Cycle Standard is met. Comprehensive environmental monitoring programs will have to be developed to confirm that, in fact, the limit is met. Just as was the case last year, tailings management and disposal is still the major item of concern relating to uranium milling operations. As stated earlier, the NRC feels that below-grade disposal is the preferred method of tailings disposal in that it provides the greatest assurances of long-term isolation. In any event, tailings must be disposed of in such a way that no active care is required of disposal sites, to avoid committing future generations to a significant, lingering obligation to care for wastes generated to produce benefits which they will only indirectly receive, if at all. While the primary means of providing long-term isolation of tailings must be by physical barriers, as a prudent, supplementary measure of control, we are concluding in the GEIS on Uranium Milling that ownership of disposal sites by a Government agency is desirable. We expect a low level of continued surveillance at disposal sites with small expense involved. We are concluding that requiring operators to contribute on the order of $100,000 per disposal site to cover ongoing expenses would be the most apropriate means of conforming to the principle that the waste generator should pay full costs of waste disposal. We feel such an arrangement would be fair, simple, and efficient, favoring it over complicated schemes involving such things as taxes on product or tailings generated and continued management of ear-marked funds. Legislation is now pending in the Congress which would give NRC direct regulatory control over mill tailings and put into place the authorities needed to implement the long-term control and funding arrangements discussed above

  11. NRC licensing of uranium enrichment plants

    International Nuclear Information System (INIS)

    Moran, B.W.

    1991-01-01

    The US Nuclear Regulatory Commission (NRC) is preparing a rule making that establishes the licensing requirements for low-enriched uranium enrichment plants. Although implementation of this rule making is timed to correspond with receipt of a license application for the Louisiana Energy Services centrifuge enrichment plant, the rule making is applicable to all uranium enrichment technologies. If ownership of the US gaseous diffusion plants and/or atomic vapor laser isotope separation is transferred to a private or government corporation, these plants also would be licensable under the new rule making. The Safeguards Studies Department was tasked by the NRC to provide technical assistance in support of the rule making and guidance preparation process. The initial and primary effort of this task involved the characterization of the potential safeguards concerns associated with a commercial enrichment plant, and the licensing issues associated with these concerns. The primary safeguards considerations were identified as detection of the loss of special nuclear material, detection of unauthorized production of material of low strategic significance, and detection of production of uranium enriched to >10% 235 U. The primary safeguards concerns identified were (1) large absolute limit of error associated with the material balance closing, (2) the inability to shutdown some technologies to perform a cleanout inventory of the process system, and (3) the flexibility of some technologies to produce higher enrichments. Unauthorized production scenarios were identified for some technologies that could prevent conventional material control and accounting programs from detecting the production and removal of 5 kg 235 U as highly enriched uranium. Safeguards techniques were identified to mitigate these concerns

  12. REVIEW OF NRC APPROVED DIGITAL CONTROL SYSTEMS ANALYSIS

    International Nuclear Information System (INIS)

    Markman, D.W.

    1999-01-01

    Preliminary design concepts for the proposed Subsurface Repository at Yucca Mountain indicate extensive reliance on modern, computer-based, digital control technologies. The purpose of this analysis is to investigate the degree to which the U. S. Nuclear Regulatory Commission (NRC) has accepted and approved the use of digital control technology for safety-related applications within the nuclear power industry. This analysis reviews cases of existing digitally-based control systems that have been approved by the NRC. These cases can serve as precedence for using similar types of digitally-based control technologies within the Subsurface Repository. While it is anticipated that the Yucca Mountain Project (YMP) will not contain control systems as complex as those required for a nuclear power plant, the review of these existing NRC approved applications will provide the YMP with valuable insight into the NRCs review process and design expectations for safety-related digital control systems. According to the YMP Compliance Program Guidance, portions of various NUREGS, Regulatory Guidelines, and nuclear IEEE standards the nuclear power plant safety related concept would be applied to some of the designs on a case-by-case basis. This analysis will consider key design methods, capabilities, successes, and important limitations or problems of selected control systems that have been approved for use in the Nuclear Power industry. An additional purpose of this analysis is to provide background information in support of further development of design criteria for the YMP. The scope and primary objectives of this analysis are to: (1) Identify and research the extent and precedence of digital control and remotely operated systems approved by the NRC for the nuclear power industry. Help provide a basis for using and relying on digital technologies for nuclear related safety critical applications. (2) Identify the basic control architecture and methods of key digital control

  13. NRC Information No. 91-29: Deficiencies identified during electrical distribution system functional inspections

    International Nuclear Information System (INIS)

    Rossi, C.E.

    1992-01-01

    During multidisciplinary inspections, the US Nuclear Regulatory Commission (NRC) has identified many deficiencies related to the electrical distribution system. To address these deficiencies, the NRC has developed an inspection to specifically evaluate the electrical distribution system. During the last year, the NRC completed eight EDSFIs, performing at least one in each of the several common deficiencies in the licensees' programs and in the electrical distribution systems as designed and configured at each plant. These deficiencies included inadequate ac voltages at the 480 Vac and 120 Vac distribution levels, inadequate procedures to test circuit breakers, and inadequate determinations and evaluations of setpoints

  14. Safeguards Summary Event List (SSEL), Pre-NRC through December 31, 1985

    International Nuclear Information System (INIS)

    1987-02-01

    The Safeguards Summary Event List (SSEL) provides brief summaries of several hundred safeguards-related events involving nuclear material or facilities regulated by the US Nuclear Regulatory Commission (NRC). Events are described under the categories of bomb-related, intrusion, missing and/or allegedly stolen, transportation, tampering/vandalism, arson, firearms, radiological sabotage, non-radiological sabotage, and miscellaneous. The information contained in the event descriptions is derived primarily from official NRC reporting channels

  15. Safeguards Summary Event List (SSEL). Pre-NRC through December 31, 1984. Revision 10

    International Nuclear Information System (INIS)

    1985-05-01

    The Safeguards Summary Event List (SSEL) provides brief summaries of several hundred safeguards-related events involving nuclear material or facilities regulated by the US Nuclear Regulatory Commission (NRC). Events are described under the categories of bomb-related, intrusion, missing and/or allegedly stolen, transportation, tampering/vandalism, arson, firearms, radiological sabotage, non-radiological sabotage and miscellaneous. The information contained in the event descriptions in derived primarily from official NRC reporting channels

  16. Safeguards Summary Event List (SSEL). Pre-NRC-June 30, 1985. Revision 11

    International Nuclear Information System (INIS)

    1986-01-01

    The Safeguards Summary Event List (SSRL) provides brief summaries of several hundred safeguards-related events involving nuclear material or facilities regulated by the US Nuclear Regulatory Commission (NRC). Events are described under the categories of bomb-related, intrusion, missing and/or allegedly stolen, transportation, tampering/vandalism, arson, firearms, radiological sabotage, non-radiological sabotage and miscellaneous. The information contained in the event descriptions is derived primarily from official NRC reporting channels. 12 figs

  17. Safeguards Summary Event List (SSEL): Pre-NRC through December 31, 1986

    International Nuclear Information System (INIS)

    1987-07-01

    The Safeguards Summary Event List (SSEL) provides brief summaries of several hundred safeguards-related events involving nuclear material or facilities regulated by the US Nuclear Regulatory Commission (NRC). Events are described under the categories of bomb-related, intrusion, missing and/or allegedly stolen, transportation, tampering/vandalism, arson, firearms, radiological sabotage, nonradiological sabotage and miscellaneous. The information contained in the event descriptions is derived primarily from official NRC reporting channels

  18. Safeguards summary event list (SSEL): Pre-NRC through December 31, 1987

    International Nuclear Information System (INIS)

    1988-07-01

    The Safeguards Summary Event List (SSEL) provides brief summaries of several hundred safeguards-related events involving nuclear material or facilities regulated by the US Nuclear Regulatory Commission (NRC). Events are described under the categories of bomb-related, intrusion, missing and/or allegedly stolen, transportation, tampering/vandalism, arson, firearms, radiological sabotage, nonradiological sabotage, alcohol and drugs, and miscellaneous. The information contained in the event descriptions is derived primarily from official NRC reporting channels

  19. Safeguards Summary Event List (SSEL), Pre-NRC through December 31, 1983. Rev. 9

    International Nuclear Information System (INIS)

    1984-06-01

    The Safeguards Summary Event List (SSEL) provides brief summaries of several hundred safeguards-related events involving nuclear material or facilities regulated by the US Nuclear Regulatory Commission (NRC). Events are described under the categories of bomb-related, intrusion, missing/allegedly stolen, transportation, tampering/vandalism, arson, firearms-related, radiological sabotage and miscellaneous. The information contained in the event descriptions is derived primarily from official NRC reporting channels

  20. Safeguards Summary Event List (SSEL). Pre-NRC through June 30, 1981

    International Nuclear Information System (INIS)

    MacMurdy, P.; Davidson, J.; Lin, H.

    1981-09-01

    The Safeguards Summary Event List (SSEL) provides brief summaries of several hundred safeguards-related events involving nuclear material or facilities regulated by the U.S. Nuclear Regulatory Commission (NRC). Events are described under the categories of bomb-related, intrusion, missing and/or allegedly stolen, transportation, vandalism, arson, firearms, sabotage and miscellaneous. The information contained in the event descriptions is derived primarily from official NRC reporting channels

  1. 75 FR 11166 - Joint Meeting of the Nuclear Regulatory Commission and the Federal Energy Regulatory Commission...

    Science.gov (United States)

    2010-03-10

    ... the Nuclear Regulatory Commission and the Federal Energy Regulatory Commission; Notice of Joint Meeting of the Nuclear Regulatory Commission and the Federal Energy Regulatory Commission March 2, 2010. The Federal Energy Regulatory Commission (FERC) and the Nuclear Regulatory Commission (NRC) will hold...

  2. NRC Support for the Kalinin (VVER) probabilistic risk assessment

    International Nuclear Information System (INIS)

    Bley, D.; Diamond, D.J.; Chu, T.L.; Azarm, A.; Pratt, W.T.; Johnson, D.; Szukiewicz, A.; Drouin, M.; El-Bassioni, A.; Su, T.M.

    1998-01-01

    The US Nuclear Regulatory Commission (NRC) and the Federal Nuclear and Radiation Safety Authority of the Russian Federation have been working together since 1994 to carry out a probabilistic risk assessment (PRA) of a VVER-1000 in the Russian Federation. This was a recognition by both parties that this technology has had a profound effect on the discipline of nuclear reactor safety in the West and that the technology should be transferred to others so that it can be applied to Soviet-designed plants. The NRC provided funds from the Agency for International Development and technical support primarily through Brookhaven National Laboratory and its subcontractors. The latter support was carried out through workshops, by documenting the methodology to be used in a set of guides, and through periodic review of the technical activity. The result of this effort to date includes a set of procedure guides, a draft final report on the Level 1 PRA for internal events (excluding internal fires and floods), and progress reports on the fire, flood, and seismic analysis. It is the authors belief that the type of assistance provided by the NRC has been instrumental in assuring a quality product and transferring important technology for use by regulators and operators of Soviet-designed reactors. After a thorough review, the report will be finalized, lessons learned will be applied in the regulatory and operational regimes in the Russian Federation, and consideration will be given to supporting a containment analysis in order to complete a simplified Level 2 PRA

  3. Regulatory and technical reports (abstract index journal)

    International Nuclear Information System (INIS)

    1994-06-01

    This compilation consists of bibliographic data and abstracts for the formal regulatory and technical reports issued by the US Nuclear Regulatory Commission (NRC) Staff and its contractors. It is NRC's intention to publish this compilation quarterly and to cumulate it annually

  4. NRC wants plant-specific responses on Thermo-Lag

    International Nuclear Information System (INIS)

    Anon.

    1994-01-01

    Dissatisfied with recent industry-backed efforts to assure fire safety at nuclear power plants, the Nuclear Regulatory Commission announced on November 24 that it would direct all nuclear plant owners to specify the actions they would take to assure that the use of the Thermo-Lag 330 fire barrier material would not lead to insufficient protection of electrical cables connected to safe-shutdown systems. Previously, the NRC had been content to let the matter wait until tests sponsored by the Nuclear Management and Resources Council (Numarc) could show whether Thermo-Lag, used and installed in certain ways, would provide sufficient protection, but the NRC and Numarc have disagreed over the test methodology, and the Numarc tests are now considered to be several months behind schedule

  5. Occupational radiation exposures at NRC-licensed facilities

    International Nuclear Information System (INIS)

    Brooks, B.G.

    1980-01-01

    For the past ten years, the Nuclear Regulatory Commission and its predecessor, the Atomic Energy Commission, have required certain licensees to routinely submit two types of occupational radiation exposure reports: termination and annual reports. Each licensee engaged in any one of the activities: (1) operation of nuclear power reactors, (2) industrial radiography, (3) fuel fabrication, processing and reprocessing, and (4) large supply of byproduct material, is required to submit an annual statistical report and a termination report for each monitored employee who ends his employment or work assignment. A new regulation now requires all NRC licensees to submit annual reports for the years 1978 and 1979. These reports have been collected, computerized and maintained by the Commission at Oak Ridge, Tennessee. They are useful to the NRC in the evaluation of the risk of radiation exposure associated with the related activities. (author)

  6. Evaluation of NRC maintenance team inspection reports for managing aging

    International Nuclear Information System (INIS)

    Fresco, A.; Gunther, W.

    1991-01-01

    A nuclear power plant's maintenance program is the principal vehicle through which age-related degradation is managed. Over the past two years, the NRC [Nuclear Regulatory Commission] has evaluated the maintenance program of every nuclear power plant in the U.S. The reports issued on these in-depth team inspections have been reviewed to ascertain the strengths and weaknesses of the programs as related to the need to understand and manage the effects of aging on nuclear power plant systems, structures, and components. Selected results of this review are presented in this paper, including examples of inspection and monitoring techniques successfully used by utilities to detect degradation due to aging. Attributes of plant maintenance programs where the NRC inspectors felt that improvement was needed to properly address the aging issue are also discussed. 6 refs., 1 tab

  7. NRC drug-free workplace plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-11-01

    On September 15, 1986, President Reagan signed Executive Order 12564, establishing the goal of a Drug-Free Federal Workplace. The Order made it a condition of employment that all Federal employees refrain from using illegal drugs on or off duty. On July 11, 1987, Congress passed legislation affecting implementation of the Executive Order under Section 503 of the Supplemental Appropriations Act of 1987, Public Law 100-71 (the Act). The Nuclear Regulatory Commission first issued the NRC Drug Testing Plan to set forth objectives, policies, procedures, and implementation guidelines to achieve a drug-free Federal workplace, consistent with the Executive Order and Section 503 of the Act. Revision 1, titled, ``NRC Drug-Free Workplace Plan,`` supersedes the previous version and its supplements and incorporates changes to reflect current guidance from the Department of Justice, the Department of Health and Human Services, as well as other guidance.

  8. Implementation study for the NRC Application and Development Facility

    International Nuclear Information System (INIS)

    Sherwood, R.J.; Ross, D.J.; Sasser, D.W.

    1979-01-01

    The Nuclear Regulatory Commission (NRC) has expressed the desire to establish an Application and Development Facility (ADF) for NRC Headquarters. The ADF is a computer system which will provide safeguards analysts access to safeguards analysis computer software. This report analyzes the issues, requirements and options available in the establishment of an ADF. The purpose and goals of the ADF are presented, along with some general issues to be considered in the implementation of such a system. A phased approach for ADF implementation, which will allow for the earliest possible access to existing codes and also allow for future expansion, is outlined. Several options for central computers are discussed, along with the characteristics and approximate costs for each. The report concludes with recommended actions proposed to start the development of the ADF

  9. NRC drug-free workplace plan. Revision 1

    International Nuclear Information System (INIS)

    1997-11-01

    On September 15, 1986, President Reagan signed Executive Order 12564, establishing the goal of a Drug-Free Federal Workplace. The Order made it a condition of employment that all Federal employees refrain from using illegal drugs on or off duty. On July 11, 1987, Congress passed legislation affecting implementation of the Executive Order under Section 503 of the Supplemental Appropriations Act of 1987, Public Law 100-71 (the Act). The Nuclear Regulatory Commission first issued the NRC Drug Testing Plan to set forth objectives, policies, procedures, and implementation guidelines to achieve a drug-free Federal workplace, consistent with the Executive Order and Section 503 of the Act. Revision 1, titled, ''NRC Drug-Free Workplace Plan,'' supersedes the previous version and its supplements and incorporates changes to reflect current guidance from the Department of Justice, the Department of Health and Human Services, as well as other guidance

  10. The use of U.S. NRC licensing practices for VVERs

    International Nuclear Information System (INIS)

    Popp, D.M.

    2000-01-01

    The licensing process for the upgraded Temelin I and C and Fuel designs were enhanced with the introduction of U.S. Nuclear Regulatory Commission, NRC practices. Specifically, the use of the NRC Regulatory Guide 1.70, 'Standard Format and Content Guide for Safety Analyses Reports' and NRC NUREG 0800, 'Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants', were beneficial in the development and review of Temelin licensing documentation. These standards have been used for the preparation and review of Safety Analysis Reports in the United States and also in a large number of licensing applications around the world. Both Regulatory Guide 1.70 and NUREG 0800 were developed to provide a predictable and structured approach to licensing. This paper discusses this approach and identifies the benefits to designers, writers of licensing documentation and reviewers of licensing documents. (author)

  11. Nuclear Regulatory Commission 1989 Information Digest

    International Nuclear Information System (INIS)

    1989-03-01

    The Nuclear Regulatory Commission 1989 Information Digest provides summary information regarding the US Nuclear Regulatory Commission, its regulatory responsibilities, and areas licensed by the Commission. This is the first of an annual publication for the general use of the NRC staff and is available to the public. The Digest is divided into two parts: the first presents an overview of the US Nuclear Regulatory Commission and the second provides data on NRC commercial nuclear reactor licensees and commercial nuclear power reactors worldwide

  12. NRC Seismic Design Margins Program Plan

    International Nuclear Information System (INIS)

    Cummings, G.E.; Johnson, J.J.; Budnitz, R.J.

    1985-08-01

    Recent studies estimate that seismically induced core melt comes mainly from earthquakes in the peak ground acceleration range from 2 to 4 times the safe shutdown earthquake (SSE) acceleration used in plant design. However, from the licensing perspective of the US Nuclear Regulatory Commission, there is a continuing need for consideration of the inherent quantitative seismic margins because of, among other things, the changing perceptions of the seismic hazard. This paper discusses a Seismic Design Margins Program Plan, developed under the auspices of the US NRC, that provides the technical basis for assessing the significance of design margins in terms of overall plant safety. The Plan will also identify potential weaknesses that might have to be addressed, and will recommend technical methods for assessing margins at existing plants. For the purposes of this program, a general definition of seismic design margin is expressed in terms of how much larger that the design basis earthquake an earthquake must be to compromise plant safety. In this context, margin needs to be determined at the plant, system/function, structure, and component levels. 14 refs., 1 fig

  13. NRC safety research in support of regulation, FY 1991

    International Nuclear Information System (INIS)

    1992-04-01

    This report, the seventh in a series of annual reports, was prepared in response to congressional inquiries concerning how nuclear regulatory research is used. It summarizes the accomplishments of the Office of Nuclear Regulatory Research during FY 1991. The goal of this office is to ensure that safety-related research provides the technical bases for rulemaking and for related decisions in support of NRC licensing and inspection activities. This research is necessary to make certain that the regulations that are imposed on licensees provide an adequate margin of safety so as to protect the health and safety of the public. This report describes both the direct contributions to scientific and technical knowledge with regard to nuclear safety and their regulatory applications

  14. NRC safety research in support of regulation, FY 1990

    International Nuclear Information System (INIS)

    1991-04-01

    This report, the sixth in a series of annual reports, was prepared in response to congressional inquiries concerning how nuclear regulatory research is used. It summarizes the accomplishments of the Office of Nuclear Regulatory Research during FY 1990. The goal of this office is to ensure that safety-related research provides the technical bases for rulemaking and for related decisions in support of NRC licensing and inspection activities. This research is necessary to make certain that the regulations that are imposed on licensees provide an adequate margin of safety so as to protect the health and safety of the public. This report describes both the direct contributions to scientific and technical knowledge with regard to nuclear safety and their regulatory applications

  15. NRC safety research in support of regulation--FY 1989

    International Nuclear Information System (INIS)

    1990-04-01

    This report, the fifth in a series of annual reports, was prepared in response to congressional inquiries concerning how nuclear regulatory research is used. It summarizes the accomplishments of the Office of Nuclear Regulatory Research during FY 1989. The goal of this office is to ensure that safety-related research provides the technical bases for rulemaking and for related decisions in support of NRC licensing and inspection activities. This research is necessary to make certain that the regulations that are imposed on licensees provide an adequate margin of safety so as to protect the health and safety of the public. This report describes both the direct contributions to scientific and technical knowledge with regard to nuclear safety and their regulatory applications

  16. NRC safety research in support of regulation, 1988

    International Nuclear Information System (INIS)

    1989-05-01

    This report, the fourth in a series of annual reports, was prepared in response to Congressional inquiries concerning how nuclear regulatory research is used. It summarizes the accomplishments of the Office of Nuclear Regulatory Research during 1988. The goal of this office is to ensure that safety-related research provides the technical bases for rulemaking and for related decisions in support of NRC licensing and inspection activities. This research is necessary to make certain that the regulations that are imposed on licensees provide an adequate margin of safety so as to protect the health and safety of the public. This report describes both the direct contributions to scientific and technical knowledge with regard to nuclear safety and their regulatory applications

  17. Nuclear Regulatory Commission Information Digest 1992 edition

    International Nuclear Information System (INIS)

    Olive, K.

    1992-03-01

    The Nuclear Regulatory Commission Information Digest provides a summary of information about the US Nuclear Regulatory Commission (NRC), NRC's regulatory responsibilities, the activities NRC licenses, and general information on domestic and worldwide nuclear energy. This digest is a compilation of nuclear- and NRC-related data and is designed to provide a quick reference to major facts about the agency and industry it regulates. In general, the data cover 1975 through 1991, with exceptions noted. Information on generating capacity and average capacity factor for operating US commercial nuclear power reactors is obtained from monthly operating reports that are submitted directly to the NRC by the licensee. This information is reviewed by the NRC for consistency only and no independent validation and/or verification is performed

  18. Recommendations for NRC policy on shift scheduling and overtime at nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Lewis, P.M.

    1985-07-01

    This report contains the Pacific Northwest Laboratory's (PNL's) recommendations to the US Nuclear Regulatory Commission (NRC) for an NRC policy on shift scheduling and hours of work (including overtime) for control room operators and other safety-related personnel in nuclear power plants. First, it is recommended that NRC make three additions to its present policy on overtime: (1) limit personnel to 112 hours of work in a 14-day period, 192 hours in 28 days, and 2260 hours in one year; exceeding these limits would require plant manager approval; (2) add a requirement that licensees obtain approval from NRC if plant personnel are expected to exceed 72 hours of work in a 7-day period, 132 hours in 14 days, 228 hours in 28 days, and 2300 hours in one year; and (3) make the policy a requirement, rather than a nonbinding recommendation. Second, it is recommended that licensees be required to obtain NRC approval to adopt a routine 12-hour/day shift schedule. Third, it is recommended that NRC add several nonbinding recommendations concerning routine 8-hour/day schedules. Finally, because additional data can strengthen the basis for future NRC policy on overtime, five methods are suggested for collecting data on overtime and its effects. 44 refs., 10 tabs.

  19. Recommendations for NRC policy on shift scheduling and overtime at nuclear power plants

    International Nuclear Information System (INIS)

    Lewis, P.M.

    1985-07-01

    This report contains the Pacific Northwest Laboratory's (PNL's) recommendations to the US Nuclear Regulatory Commission (NRC) for an NRC policy on shift scheduling and hours of work (including overtime) for control room operators and other safety-related personnel in nuclear power plants. First, it is recommended that NRC make three additions to its present policy on overtime: (1) limit personnel to 112 hours of work in a 14-day period, 192 hours in 28 days, and 2260 hours in one year; exceeding these limits would require plant manager approval; (2) add a requirement that licensees obtain approval from NRC if plant personnel are expected to exceed 72 hours of work in a 7-day period, 132 hours in 14 days, 228 hours in 28 days, and 2300 hours in one year; and (3) make the policy a requirement, rather than a nonbinding recommendation. Second, it is recommended that licensees be required to obtain NRC approval to adopt a routine 12-hour/day shift schedule. Third, it is recommended that NRC add several nonbinding recommendations concerning routine 8-hour/day schedules. Finally, because additional data can strengthen the basis for future NRC policy on overtime, five methods are suggested for collecting data on overtime and its effects. 44 refs., 10 tabs

  20. Performance testing of dosimetry processors, status of NRC rulemaking for improved personnel dosimetry processing, and some beta dosimetry and instrumentation problems observed by NRC regional inspectors

    International Nuclear Information System (INIS)

    Dennis, N.A.; Kinneman, J.D.; Costello, F.M.; White, J.R.; Nimitz, R.L.

    1983-01-01

    Early dosimetry processor performance studies conducted between 1967 and 1979 by several different investigators indicated that a significant percentage of personnel dosimetry processors may not be performing with a reasonable degree of accuracy. Results of voluntary performance testing of US personnel dosimetry processors against the final Health Physics Society Standard, Criteria for Testing Personnel Dosimetry Performance by the University of Michigan for the Nuclear Regulatory Commission (NRC) will be summarized with emphasis on processor performance in radiation categories involving beta particles and beta particles and photon mixtures. The current status of the NRC's regulatory program for improved personnel dosimetry processing will be reviewed. The NRC is proposing amendments to its regulations, 10 CFR Part 20, that would require its licensees to utilize specified personnel dosimetry services from processors accredited by the National Voluntary Laboratory Accreditation Program of the National Bureau of Standards. Details of the development and schedule for implementation of the program will be highlighted. Finally, selected beta dosimetry and beta instrumentation problems observed by NRC Regional Staff during inspections of NRC licensed facilities will be discussed

  1. NRC/AMRMC Resident Research Associateship Program

    Science.gov (United States)

    2018-05-01

    conducted the following activities in support of the subject contract: Outreach and Promotion The promotional schedule to advertise the NRC Research...Approved for Public Release; Distribution Unlimited 13. SUPPLEMENTARY NOTES 14. ABSTRACT During this reporting period, the NRC promoted research...Associateship Programs included the following: 1) attendance at meetings of major scientific and engineering professional societies; 2) advertising in

  2. Report to Congress on NRC emergency communications

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1980-09-01

    The accident at Three Mile Island highlighted the need for improved communications among the NRC and other organizations which respond to such emergencies. This report summarizes the communication problems identified by several major review groups after the accident, the status of corrective actions, and NRC plans to improve communications still further. (author)

  3. Final report of the NRC-Agreement State Working Group to evaluate control and accountability of licensed devices

    International Nuclear Information System (INIS)

    1996-10-01

    US NRC staff acknowledged that licensees were having problems maintaining control over and accountability for devices containing radioactive material. In June 1995, NRC approved the staff's suggestion to form a joint NRC-Agreement State Working Group to evaluate the problem and propose solutions. The staff indicated that the Working Group was necessary to address the concerns from a national perspective, allow for a broad level of Agreement State input, and to reflect their experience. Agreement State participation in the process was essential since some Agreement States have implemented effective programs for oversight of device users. This report includes the 5 recommendations proposed by the Working Group to increase regulatory oversight, increase control and accountability of devices, ensure proper disposal, and ensure disposal of orphaned devices. Specifically, the Working Group recommends that: (1) NRC and Agreement States increase regulatory oversight for users of certain devices; (2) NRC and Agreement State impose penalties on persons losing devices; (3) NRC and Agreement States ensure proper disposal of orphaned devices; (4) NRC encourage States to implement similar oversight programs for users of Naturally-Occurring or Accelerator- Produced Material; and (5) NRC encourage non-licensed stakeholders to take appropriate actions, such as instituting programs for material identification

  4. Final report of the NRC-Agreement State Working Group to evaluate control and accountability of licensed devices

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-10-01

    US NRC staff acknowledged that licensees were having problems maintaining control over and accountability for devices containing radioactive material. In June 1995, NRC approved the staff`s suggestion to form a joint NRC-Agreement State Working Group to evaluate the problem and propose solutions. The staff indicated that the Working Group was necessary to address the concerns from a national perspective, allow for a broad level of Agreement State input, and to reflect their experience. Agreement State participation in the process was essential since some Agreement States have implemented effective programs for oversight of device users. This report includes the 5 recommendations proposed by the Working Group to increase regulatory oversight, increase control and accountability of devices, ensure proper disposal, and ensure disposal of orphaned devices. Specifically, the Working Group recommends that: (1) NRC and Agreement States increase regulatory oversight for users of certain devices; (2) NRC and Agreement State impose penalties on persons losing devices; (3) NRC and Agreement States ensure proper disposal of orphaned devices; (4) NRC encourage States to implement similar oversight programs for users of Naturally-Occurring or Accelerator- Produced Material; and (5) NRC encourage non-licensed stakeholders to take appropriate actions, such as instituting programs for material identification.

  5. Neutron spectral characterization of the NRC-HSST experiments

    International Nuclear Information System (INIS)

    Stallmann, F.W.; Kam, F.B.K.

    1979-01-01

    Irradiation experiments are being performed for the US Nuclear Regulatory Commission (NRC) Heavy Section Steel Technology (HSST) program. Results of dosimetry performed in the second experiment have been previously reported. Similar procedures were followed in the third experiment. The experiences gained in these two experiments have led to modifications in the composition and distribution of foil dosimeters which monitor the neutron flux-spectra in the irradiated steel specimens. It is expected that in the new experiments much higher accuracies than previously possible can be achieved in the determination of irradiation damage parameters

  6. Neutron spectral characterization of the NRC-HSST experiments

    Energy Technology Data Exchange (ETDEWEB)

    Stallmann, F. W.; Kam, F. B.K.

    1979-01-01

    Irradiation experiments are being performed for the US Nuclear Regulatory Commission (NRC) Heavy Section Steel Technology (HSST) program. Results of dosimetry performed in the second experiment have been previously reported. Similar procedures were followed in the third experiment. The experiences gained in these two experiments have led to modifications in the composition and distribution of foil dosimeters which monitor the neutron flux-spectra in the irradiated steel specimens. It is expected that in the new experiments much higher accuracies than previously possible can be achieved in the determination of irradiation damage parameters.

  7. Overview of the NRC nuclear waste management program

    International Nuclear Information System (INIS)

    Malaro, J.C.

    1976-01-01

    The NRC has firmly established waste management as a high-priority effort and has made the commitment to act rapidly and methodically to establish a sound regulatory base for licensing waste management activities. We believe the priorities for NRC work in waste management are consistent with the needs of the overall national waste management program. Present licensing procedures and criteria are adequate for the short term, and priority attention is being given to the longer term, when the quantities of waste to be managed will be greater and licensing demands will increase. Recognizing that its decision will affect industry, other governmental jurisdictions, private interest groups, and the public at large, NRC has encouraged and will continue to encourage their participation in planning our program. We also recognize that the problems of nuclear waste management are international in scope. Many waste management problems (e.g., potential for contamination of oceans and atmosphere, need for isolation of some wastes for longer periods than governments and political boundaries have remained stable in the past), require a set of internationally acceptable and accepted solutions. The wastes from the U.S. nuclear industry will account for only about one third of the nuclear waste generated in the world. Therefore, we propose to cooperate and where appropriate take the lead in establishing acceptable worldwide policies, standards and procedures for handling nuclear wastes

  8. A review of NRC staff uses of probabilistic risk assessment

    Energy Technology Data Exchange (ETDEWEB)

    1994-03-01

    The NRC staff uses probabilistic risk assessment (PRA) and risk management as important elements its licensing and regulatory processes. In October 1991, the NRC`s Executive Director for Operations established the PRA Working Group to address concerns identified by the Advisory Committee on Reactor Safeguards with respect to unevenness and inconsistency in the staff`s current uses of PRA. After surveying current staff uses of PRA and identifying needed improvements, the Working Group defined a set of basic principles for staff PRA use and identified three areas for improvements: guidance development, training enhancements, and PRA methods development. For each area of improvement, the Working Group took certain actions and recommended additional work. The Working Group recommended integrating its work with other recent PRA-related activities the staff completed and improving staff interactions with PRA users in the nuclear industry. The Working Group took two key actions by developing general guidance for two uses of PRA within the NRC (that is, screening or prioritizing reactor safety issues and analyzing such issues in detail) and developing guidance on basic terms and methods important to the staff`s uses of PRA.

  9. A review of NRC staff uses of probabilistic risk assessment

    International Nuclear Information System (INIS)

    1994-03-01

    The NRC staff uses probabilistic risk assessment (PRA) and risk management as important elements its licensing and regulatory processes. In October 1991, the NRC's Executive Director for Operations established the PRA Working Group to address concerns identified by the Advisory Committee on Reactor Safeguards with respect to unevenness and inconsistency in the staff's current uses of PRA. After surveying current staff uses of PRA and identifying needed improvements, the Working Group defined a set of basic principles for staff PRA use and identified three areas for improvements: guidance development, training enhancements, and PRA methods development. For each area of improvement, the Working Group took certain actions and recommended additional work. The Working Group recommended integrating its work with other recent PRA-related activities the staff completed and improving staff interactions with PRA users in the nuclear industry. The Working Group took two key actions by developing general guidance for two uses of PRA within the NRC (that is, screening or prioritizing reactor safety issues and analyzing such issues in detail) and developing guidance on basic terms and methods important to the staff's uses of PRA

  10. Regulatory and technical reports: (Abstract index journal). Compilation for first quarter 1997, January--March

    International Nuclear Information System (INIS)

    Sheehan, M.A.

    1997-06-01

    This compilation consists of bibliographic data and abstracts for the formal regulatory and technical reports issued by the U.S. Nuclear Regulatory Commission (NRC) Staff and its contractors. This compilation is published quarterly and cummulated annually. Reports consist of staff-originated reports, NRC-sponsored conference reports, NRC contractor-prepared reports, and international agreement reports

  11. Comparisons of ANSI standards cited in the NRC standard review plan, NUREG-0800 and related documents

    International Nuclear Information System (INIS)

    Ankrum, A.R.; Bohlander, K.L.; Gilbert, E.R.; Pawlowski, R.A.; Spiesman, J.B.

    1995-11-01

    This report provides the results of comparisons of the cited and latest versions of ANSI standards cited in the NRC Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants (NUREG 0800) and related documents. The comparisons were performed by Battelle Pacific Northwest Laboratories in support of the NRC's Standard Review Plan Update and Development Program. Significant changes to the standards, from the cited version to the latest version, are described and discussed in a tabular format for each standard. Recommendations for updating each citation in the Standard Review Plan are presented. Technical considerations and suggested changes are included for related regulatory documents (i.e., Regulatory Guides and the Code of Federal Regulations) citing the standard. The results and recommendations presented in this document have not been subjected to NRC staff review

  12. Comparisons of ASTM standards cited in the NRC standard review plan, NUREG-0800 and related documents

    International Nuclear Information System (INIS)

    Ankrum, A.R.; Bohlander, K.L.; Gilbert, E.R.; Pawlowski, R.A.; Spiesman, J.B.

    1995-10-01

    This report provides the results of comparisons of the cited and latest versions of ASTM standards cited in the NRC Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants (NUREG 0800) and related documents. The comparisons were performed by Battelle Pacific Northwest Laboratories in support of the NRC's Standard Review Plan Update and Development Program. Significant changes to the standards, from the cited version to the latest version, are described and discussed in a tabular format for each standard. Recommendations for updating each citation in the Standard Review Plan are presented. Technical considerations and suggested changes are included for related regulatory documents (i.e., Regulatory Guides and the Code of Federal Regulations) citing the standard. The results and recommendations presented in this document have not been subjected to NRC staff review

  13. 76 FR 40282 - Proposed Generic Communications; Draft NRC Regulatory Issue Summary 2011-XX; NRC Regulation of...

    Science.gov (United States)

    2011-07-08

    ... structures; soil; groundwater; sewers or storm drains; targets and associated contamination on firing ranges... operational use, it would revert to its initial classification as byproduct material. Under this clarification..., degradation of buried markers can result in contamination of the surrounding soil or groundwater. In addition...

  14. 77 FR 33253 - Regulatory Guide 8.33, Quality Management Program

    Science.gov (United States)

    2012-06-05

    ... NUCLEAR REGULATORY COMMISSION [NRC-2012-0126] Regulatory Guide 8.33, Quality Management Program... Regulatory Commission (NRC or Commission) is withdrawing Regulatory Guide (RG) 8.33, ``Quality Management... Quality Management Program was deleted from the regulations as part of an overall revision in 2002 of the...

  15. NRC Information No. 89-89: Event notification worksheets

    International Nuclear Information System (INIS)

    Rossi, C.E.

    1992-01-01

    The NRC ''Event Notification Worksheet,'' NRC Form 361, has been revised to assist the NRC Headquarters Operations Officers in obtaining adequate information for evaluation of significant events reported to the NRC Operations Center. The new forms more accurately reflect the event classifications and the 10 CFR 50.72 categories that must be reported. A copy of the new worksheet is enclosed for your reference. NRC Form 361 can be ordered from the NRC Information and Records Management Branch

  16. Development of the NRC`s Human Performance Investigation Process (HPIP). Volume 2, Investigators`s Manual

    Energy Technology Data Exchange (ETDEWEB)

    Paradies, M.; Unger, L. [System Improvements, Inc., Knoxville, TN (United States); Haas, P.; Terranova, M. [Concord Associates, Inc., Knoxville, TN (United States)

    1993-10-01

    The three volumes of this report detail a standard investigation process for use by US Nuclear Regulatory Commission (NRC) personnel when investigating human performance related events at nuclear power plants. The process, called the Human Performance Investigation Process (HPIP), was developed to meet the special needs of NRC personnel, especially NRC resident and regional inspectors. HPIP is a systematic investigation process combining current procedures and field practices, expert experience, NRC human performance research, and applicable investigation techniques. The process is easy to learn and helps NRC personnel perform better field investigations of the root causes of human performance problems. The human performance data gathered through such investigations provides a better understanding of the human performance issues that cause event at nuclear power plants. This document, Volume II, is a field manual for use by investigators when performing event investigations. Volume II includes the HPIP Procedure, the HPIP Modules, and Appendices that provide extensive documentation of each investigation technique.

  17. Pilot program: NRC severe reactor accident incident response training manual: Public protective actions: Predetermined criteria and initial actions

    International Nuclear Information System (INIS)

    Martin, J.A. Jr.; McKenna, T.J.; Miller, C.W.; Hively, L.M.; Sharpe, R.W.; Giitter, J.G.; Watkins, R.M.

    1987-02-01

    This pilot training manual has been written to fill the need for a general text on NRC response to reactor accidents. The manual is intended to be the foundation for a course for all NRC response personnel. Public Protective Actions - Predetermined Criteria and Initial Actions is the fourth in a series of volumes that collectively summarize the US Nuclear Regulatory Commission (NRC) emergency response during severe power reactor accidents and provide necessary background information. This volume reviews public protective action criteria and objectives, their bases and implementation, and the expected public response. Each volume serves, respectively, as the text for a course of instruction in a series of courses for NRC response personnel. These materials do not provide guidance or license requirements for NRC licensees. Each volume is accompanied by an appendix of slides that can be used to present this material. The slides are called out in the text

  18. 75 FR 21979 - NRC Region II Address and Main Telephone Number Changes

    Science.gov (United States)

    2010-04-27

    ... Region II Address and Main Telephone Number Changes AGENCY: Nuclear Regulatory Commission. ACTION: Final... address for its Region II office and to update the main telephone number. The Region II office move and... update the NRC Region II office street address and office main telephone number. The physical location of...

  19. Reports distributed in 1976 under the NRC Light-Water Reactor Safety Technical Exchange. Volume II

    International Nuclear Information System (INIS)

    Sharp, D.S.; Cottrell, W.B.

    1977-01-01

    Lists of documents exchanged in 1976 under agreement between the U.S. Nuclear Regulatory Commission's Office of Nuclear Regulatory Research and the governments of France, Federal Republic of Germany, and Japan are presented. In 1976 the NRC received 25 reports from France, 74 from F.R. Germany, and 39 from Japan, and in return sent 119 U.S. reports to France, 154 to F.R. Germany, and 155 to Japan

  20. The WTO Agenda and the Media Agenda

    DEFF Research Database (Denmark)

    Andersen, Rune Saugmann; Skjoldan, Lasse

    ’ (DDA) negotiations. While the DDA was set off in 2001 and was intended to be concluded by the end of 2004, the multilateral negotiations are in the end of 2007 still short of agreement. This thesis conceives of the media agenda as an important factor influencing trade policy formation and trade...... negotiation in the WTO. Combining elements from agenda-setting and institutional media theory, the study examines which issues and themes have been covered (priming) and from which angles these issue have been covered (framing). In particular, this thesis investigates the degree to which this priming...... as the ones who should liberalise. When this particular press coverage of the DDA is highly institutionalised, it means that it will be sticky and less prone to change. And because the media agenda is taken to affect the WTO agenda, the actors who are (dis)advantaged from this particular coverage in the press...

  1. Typical NRC inspection procedures for model plant

    International Nuclear Information System (INIS)

    Blaylock, J.

    1984-01-01

    A summary of NRC inspection procedures for a model LEU fuel fabrication plant is presented. Procedures and methods for combining inventory data, seals, measurement techniques, and statistical analysis are emphasized

  2. NRC/AMRMC Resident Research Associateship Program

    Science.gov (United States)

    2016-04-01

    8. Curcumin : A Prototype Anti-inflammatory Therapeutic for Burn Pain and Wound Healing. Burn and Trauma Research Workgroup. BAMMC Burn Center 2014 9...from Burkholderia infection in mice. 9) PUBLICATIONS AND PAPERS RESULTING FROM NRC ASSOCIATESHIP RESEARCH Provide complete citations: author(s), title...PUBLICATIONS AND PAPERS RESULTING FROM NRC ASSOCIATESHIP RESEARCH Provide complete citations: author(s), title, full name of journal, volume number, page

  3. Assessment of the NRC Enforcement Program

    International Nuclear Information System (INIS)

    Lieberman, J.; Coblentz, L.

    1995-04-01

    On May 12, 1994, the Executive Director for Operations (EDO) established a Review Team composed of senior NRC managers to re-examine the NRC enforcement program. A copy of the Review Team's charter is enclosed as Appendix A. This report presents the Team's assessment. The purpose of this review effort are: (1) to perform an assessment of the NRC's enforcement program to determine whether the defined purposes of the enforcement program are appropriate; (2) to determine whether the NRC's enforcement practices and procedures for issuing enforcement actions are consistent with those purposes; and (3) to provide recommendations on any changes the Review Team believes advisable. In accordance with its charter, the Review Team considered the following principal issues in conducting its assessment of the enforcement program: the balance between providing deterrence and incentives (both positive and negative) for the identification and correction of violations; the appropriateness of NRC sanctions; whether the commission should seek statutory authority to increase the amount of civil penalties; whether the NRC should use different enforcement policies and practices for different licensees (e.g., materials licensees in contrast to power reactors or large fuel facilities); and whether the commission should establish open enforcement conferences as the normal practice

  4. NRC Information No. 90-01: Importance of proper response to self-identified violations by licensees

    International Nuclear Information System (INIS)

    Cunningham, R.E.

    1992-01-01

    NRC expects a high standard of compliance by its licensees and requires that licensees provide NRC accurate and complete information and that required records will also be complete and accurate in all material respects. Licensees should be aware of the importance placed by NRC on licensee programs for self detection, correction and reporting of violations or errors related to regulatory requirements. The General Statement of Policy and Procedures for NRC Enforcement Actions in Appendix C to 10 CFR Part 2 underscores the importance of licensees responding promptly and properly to self-identified violations in two ways. It is suggested that when a licensee identifies a violation involving an NRC-required record, the licensee should make a dated notation indicating identification, either on the record itself or other appropriate documentation retrievable for NRC review. The record with the self-identified violation noted should not be altered in any way to mask the correction. The licensee should determine the cause of the violation, correct the root cause of the violation, and document such findings in an appropriate manner. Licensees should also assure that if a report of the violation is required, the report is submitted to NRC in a timely manner. These actions will be considered by NRC in making any enforcement decision, and generally lead to lesser or no civil penalty

  5. Berkeley Lab Pilot on External Regulation of DOE National Laboratories by the U.S. NRC

    International Nuclear Information System (INIS)

    Zeman, Gary H.

    1999-01-01

    The US Department of Energy and the US Nuclear Regulatory Commission entered into an agreement in November 1997 to pursue external regulation of radiation safety at DOE national laboratories through a Pilot Program of simulated regulation at 6-10 sites over a 2 year period. The Ernest Orlando Lawrence Berkeley National Laboratory (Berkeley Lab), the oldest of the DOE national laboratories, volunteered and was selected as the first Pilot site. Based on the similarities and linkages between Berkeley Lab and nearby university research laboratories, Berkeley Lab seemed a good candidate for external regulation and a good first step in familiarizing NRC with the technical and institutional issues involved in regulating laboratories in the DOE complex. NRC and DOE team members visited Berkeley Lab on four occasions between October 1997 and January 1998 to carry out the Pilot. The first step was to develop a detailed Work Plan, then to carry out both a technical review of the radiation safety program and an examination of policy and regulatory issues. The Pilot included a public meeting held in Oakland, CA in December 1997. The Pilot concluded with NRC's assessment that Berkeley Lab has a radiation protection program adequate to protect workers, the public and the environment, and that it is ready to be licensed by the NRC with minor programmatic exceptions. A draft final report of the Pilot was prepared and circulated for comment as a NUREG document (dated May 7, 1998). The report's recommendations include extending NRC regulatory authority to cover all ionizing radiation sources (including accelerators, x-ray units, NARM) at Berkeley Lab. Questions remaining to be resolved include: who should be the licensee (DOE, the Lab, or both)?; dealing with legacy issues and NRC D and D requirements; minimizing dual oversight; quantifying value added in terms of cost savings, enhanced safety, and improved public perception; extrapolating results to other national laboratories; and

  6. Directory of Certificates of Compliance for Radioactive Materials Packages: Report of NRC Approved Packages

    International Nuclear Information System (INIS)

    1993-10-01

    This directory contains a Report of NRC Approved Packages (Volume 1). The purpose of this directory is to make available a convenient source of information on Quality Assurance Programs and Packagings which have been approved by the US Nuclear Regulatory Commission. Shipments of radioactive material utilizing these packagings must be in accordance with the provisions of 49 CFR section 173.471 and 10 CFR Part 71, as applicable. In satisfying the requirements of Section 71.12, it is the responsibility of the licensees to insure themselves that they have a copy of the current approval and conduct their transportation activities in accordance with an NRC approved quality assurance program

  7. Managing aging in nuclear power plants: Insights from NRC's maintenance team inspection reports

    International Nuclear Information System (INIS)

    Fresco, A.; Subudhi, M.

    1994-01-01

    Age-related degradation is managed through the maintenance program of a nuclear plant. From 1988 to 1991, the Nuclear Regulatory Commission (NRC) evaluated the maintenance program of every nuclear power plant in the United States. The authors reviewed 44 out of a total of 67 of the reports issued by the NRC on these in-depth team inspections. The reports were reviewed for insights into the strengths and weaknesses of the programs as related to the need to understand and manage the effects of aging on nuclear plant structures, systems, and components. The authors' conclusions are presented. 6 refs

  8. NRC TLD Direct Radiation Monitoring Network. Volume 5, No. 2. Progress report, April-June 1985

    International Nuclear Information System (INIS)

    Jang, J.; Kramaric, M.; Cohen, L.

    1985-09-01

    The US Nuclear Regulatory Commission (NRC) Direct Radiation Monitoring Network provides continuous measurement of the ambient radiation levels around licensed NRC facilities, primarily power reactors. The Network is intended to measure radiation levels during routine facility operations and to establish background radiation levels used to assess the radiological impact of an unusual condition, such as an accident. This report presents the radiation levels measured around all facilities in the Network for the second quarter of 1985. A complete listing of the site facilities monitored is included

  9. Safeguards Summary Event List (SSEL), pre-NRC through December 31, 1989

    International Nuclear Information System (INIS)

    1990-07-01

    The Safeguards Summary Event List (SSEL) provides brief summaries of several hundred safeguards-related events involving nuclear material or facilities regulated by the US Nuclear Regulatory Commission (NRC). Because of public interest, the Miscellaneous category includes a few events which involve either source material, byproduct material, or natural uranium which are exempt from safeguards requirements. Events are described under the categories of bomb-related, intrusion, missing and/or allegedly stolen, transportation, tampering/vandalism, arson, firearms, radiological sabotage, nonradiological sabotage, alcohol and drugs (involving reactor operators, security force members, or management persons), and miscellaneous. The information contained in the event descriptions is derived primarily from official NRC reporting channels

  10. New security measures are proposed for N-plants: Insider Rule package is issued by NRC

    International Nuclear Information System (INIS)

    Anon.

    1984-01-01

    New rules proposed by the Nuclear Regulatory Commission (NRC) will require background investigations and psychological assessments of new job candidates and continual monitoring of the behavior of all power plant workers with access to sensitive areas. Licensees will have to submit an ''access authorization'' program for approval describing how they will conduct these security activities. The employee checks will go back five years to examine credit, educational, and criminal histories. Implementation of the rules could involve the Edison Electric Institute as an intermediary to funnel criminal checks from the Justice Department and FBI. The NRC is also considering a clarification of areas designated as ''vital'' because current designations may be too strict

  11. General statement of policy and procedures for NRC enforcement actions: Enforcement policy. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-05-01

    This document includes the US Nuclear Regulatory Commission`s (NRC`s or Commission`s) revised General Statement of Policy and Procedure for Enforcement Actions (Enforcement Policy) as it was published in the Federal Register on May 13, 1998 (63 ER 26630). The Enforcement Policy is a general statement of policy explaining the NRC`s policies and procedures in initiating enforcement actions, and of the presiding officers and the Commission in reviewing these actions. This policy statement is applicable to enforcement matters involving the radiological health and safety of the public, including employees` health and safety, the common defense and security, and the environment.

  12. NRC staff preliminary analysis of public comments on advance notice of proposed rulemaking on emergency planning

    International Nuclear Information System (INIS)

    Peabody, C.A.; Hickey, J.W.N.

    1980-01-01

    The Nuclear Regulatory Commission (NRC) published an advance notice of proposed rulemaking on emergency planning on July 17, 1979 (44 FR 41483). In October and November 1979, the NRC staff submitted several papers to the Commission related to the emergency planning rulemaking. One of these papers was a preliminary analysis of public comments received on the advance notice (SECY-79-591B, November 13, 1979). This document consists of the preliminary analysis as it was submitted to the Commission, with minor editorial changes

  13. General statement of policy and procedures for NRC enforcement actions: Enforcement policy. Revision 1

    International Nuclear Information System (INIS)

    1998-05-01

    This document includes the US Nuclear Regulatory Commission's (NRC's or Commission's) revised General Statement of Policy and Procedure for Enforcement Actions (Enforcement Policy) as it was published in the Federal Register on May 13, 1998 (63 ER 26630). The Enforcement Policy is a general statement of policy explaining the NRC's policies and procedures in initiating enforcement actions, and of the presiding officers and the Commission in reviewing these actions. This policy statement is applicable to enforcement matters involving the radiological health and safety of the public, including employees' health and safety, the common defense and security, and the environment

  14. 10 CFR 2.709 - Discovery against NRC staff.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Discovery against NRC staff. 2.709 Section 2.709 Energy... Rules for Formal Adjudications § 2.709 Discovery against NRC staff. (a)(1) In a proceeding in which the NRC staff is a party, the NRC staff will make available one or more witnesses, designated by the...

  15. Structure and drafting of safeguards regulatory documents

    International Nuclear Information System (INIS)

    Cole, R.J.; Bennett, C.A.; Edelhertz, H.; Wood, M.T.; Brown, R.J.; Roberts, F.P.

    1977-09-01

    Improving communication of NRU's requirements is the subject of this study. This summary is organized in terms of four decisions on whether safeguards regulatory documents as communication instruments should be an explicit NRC program, what communication methods should be focused on, what actions are feasible and desirable, and how should the NRC divide its effort and resources among desirable actions

  16. 76 FR 23845 - Draft Regulatory Guide: Issuance, Availability

    Science.gov (United States)

    2011-04-28

    ... INFORMATION: I. Introduction The U.S. Nuclear Regulatory Commission (NRC) is issuing for public comment a... provides text and image files of the NRC's public documents. If you do not have access to ADAMS or if there...- 800-397-4209, 301-415-4737, or by e-mail to [email protected] . The Regulatory Analysis is...

  17. 75 FR 33853 - Draft Regulatory Guide: Issuance, Availability

    Science.gov (United States)

    2010-06-15

    .... Introduction The U.S. Nuclear Regulatory Commission (NRC) is issuing for public comment a draft guide in the... provides text and image files of NRC's public documents. If you do not have access to ADAMS or if there are... ADAMS Accession Number ML100760364. The regulatory analysis is available electronically under ADAMS...

  18. 76 FR 2425 - Draft Regulatory Guide: Reissuance and Availability

    Science.gov (United States)

    2011-01-13

    ... INFORMATION: I. Introduction The U.S. Nuclear Regulatory Commission (NRC) is issuing for public comment a..., the public can gain entry into ADAMS, which provides text and image files of NRC's public [email protected] . The Regulatory Analysis is available electronically under ADAMS Accession Number...

  19. 76 FR 5215 - Draft Regulatory Guide: Issuance, Availability

    Science.gov (United States)

    2011-01-28

    ... . SUPPLEMENTARY INFORMATION: I. Introduction The U.S. Nuclear Regulatory Commission (NRC) is issuing for public... . From this page, the public can gain entry into ADAMS, which provides text and image files of NRC's... [email protected] . The Regulatory Analysis is available electronically under ADAMS Accession...

  20. 75 FR 52996 - Draft Regulatory Guide: Issuance, Availability

    Science.gov (United States)

    2010-08-30

    .... Introduction The U.S. Nuclear Regulatory Commission (NRC) is issuing for public comment a draft guide in the... entry into ADAMS, which provides text and image files of NRC's public documents. If you do not have.../ . The regulatory analysis may be found in ADAMS under Accession No. ML102310331. Federal Rulemaking Web...

  1. Reassessment of NRC's dollar per person-rem conversion factor policy

    International Nuclear Information System (INIS)

    1995-12-01

    The US Nuclear Regulatory Commission (NRC) has completed a review and analysis of its dollar per person-rem conversion factor policy. As a result of this review, the NRC has decided to adopt a $2000 per person-rem conversion factor, subject it to present worth considerations, and limit its scope solely to health effects. This is in contrast to the previous policy and staff practice of using an undiscounted $1000 per person-rem conversion factor that served as a surrogate for all offsite consequences (health and offsite property). The policy shift has been incorporated in ''Regulatory Analysis Guidelines of the US Nuclear Regulatory Commission,'' NUREG/BR-0058, Revision 2, November 1995

  2. NRC's rulemaking to require materials licensees to be financially responsible for cleanup of accidental releases

    International Nuclear Information System (INIS)

    Seeman, M.J.

    1987-01-01

    On June 7, 1985, the US Nuclear Regulatory Commission (NRC) published an advance notice of proposed rulemaking (ANPRM) in the Federal Register to address funding for cleanup of accidents and unexpected decontamination by certain materials licensees. The NRC asked for public comment to help them determine whether to amend its regulations to require certain materials and fuel cycle licensees to demonstrate that they possess adequate financial means to pay for cleanup of accidental releases of radioactive materials. If licensees lack adequate financial resources and funds are to available for prompt cleanup, the consequences could be potentially significant for the public, the licencee and the federal government. The purpose of this paper is to explain the purpose and scope of the Commission's proposed regulatory action, as well as describing several accidents that made the Commission consider this action. Additionally, the paper will address other regulatory precedents. Finally, the paper will conclude by generally characterizing the public comments and items of concern raised by commenters

  3. 75 FR 33361 - Notice of Issuance of Regulatory Guide

    Science.gov (United States)

    2010-06-11

    ....gov/reading-rm/doc-collections/ . In addition, regulatory guides are available for inspection at the... NUCLEAR REGULATORY COMMISSION [NRC-2009-0308] Notice of Issuance of Regulatory Guide AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Regulatory Guide 1.28...

  4. Hispanic Business Agenda.

    Science.gov (United States)

    Coca-Cola USA, Atlanta, GA.

    This is a corporate policy statement of the Hispanic business agenda of Coca Cola USA, and the results of a community survey conducted to inform that agenda. The statement outlines several areas of company policy as they relate to Hispanic Americans. These areas include regional marketing, promotion, and community relations strategies, a…

  5. Agenda infectieuze ziekten paard

    NARCIS (Netherlands)

    Anonymous,

    2011-01-01

    De agenda infectieuze paardenziekten is mede op verzoek van het ministerie van EL&I geschreven door de Sectorraad Paarden (SRP) voor beleidsmakers van paardensport- en fokkerijorganisaties, hippische ondernemers en de overheid. In deze agenda geeft de SRP haar visie hoe te komen tot de borging

  6. The 2030 Global Agenda

    DEFF Research Database (Denmark)

    Enemark, Stig

    2016-01-01

    Sound land governance is fundamental to achieving the 2030 Global Agenda as set by the Sustainable. Development Goals (SDGs) adopted by all the world’s leaders at the UN Summit in September 2015. This Global Agenda calls for a “data revolution” for sustainable development to empower people...

  7. 77 FR 34379 - Notice of Joint Meeting of the Nuclear Regulatory Commission and the Federal Energy Regulatory...

    Science.gov (United States)

    2012-06-11

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. AD06-6-000] Notice of Joint Meeting of the Nuclear Regulatory Commission and the Federal Energy Regulatory Commission The Federal Energy Regulatory Commission (FERC) and the Nuclear Regulatory Commission (NRC) will hold a joint meeting...

  8. Overview of the NRC performance monitoring program

    International Nuclear Information System (INIS)

    Jordan, E.L.

    1987-01-01

    In response to the accident at Three Mile Island, the NRC developed the Systematic Assessment of Licensee Performance (SALP) Program to aid in the identification of those licensees that were more likely than others to have safety problems and to provide a rational basis for allocation of inspection resources. The NRC also has an ongoing program of screening and evaluating operating reactor event reports on a daily basis for promptly identifying safety problems. Although the SALP and event report evaluation programs have been successful in identifying potential performance problems, a concern developed recently about the adequacy and timeliness of NRC programs to detect poor or declining performance. The performance indicator program as approved by the commission is in the implementation phase. The program is expected to undergo refinements as new indicators are developed and experience is gained in the use of indicators

  9. Safeguards Summary Event List (SSEL), pre-NRC through December 31, 1989

    International Nuclear Information System (INIS)

    1992-07-01

    The Safeguards Summary Event List (SSEL), Vol. 1, provides brief summaries of several hundred safeguards-related events involving nuclear material or facilities regulated by the US Nuclear Regulatory Commission (NRC) which occurred and were reported from pre-NRC through December 31, 1989. Because of public interest, the Miscellaneous category includes a few events which involve either source material, byproduct material, or natural uranium which are exempt from safeguards requirements. Events are described under the categories of bomb-related, intrusion, missing and/or allegedly stolen, transportation, tampering/vandalism, arson, firearms, radiological sabotage, nonradiological sabotage, and miscellaneous. The information contained in the event descriptions is derived primarily from official NRC reporting channels

  10. Pilot program: NRC severe reactor accident incident response training manual: Severe reactor accident overview

    International Nuclear Information System (INIS)

    McKenna, T.J.; Martin, J.A.; Miller, C.W.; Hively, L.M.; Sharpe, R.W.; Giitter, J.G.; Watkins, R.M.

    1987-02-01

    This pilot training manual has been written to fill the need for a general text on NRC response to reactor accidents. The manual is intended to be the foundation for a course for all NRC response personnel. Severe Reactor Accident Overview is the second in a series of volumes that collectively summarize the US Nuclear Regulatory Commission (NRC) emergency response during severe power reactor accidents and provide necessary background information. This volume describes elementary perspectives on severe accidents and accident assesment. Each volume serves, respectively, as the text for a course of instruction in a series of courses. Each volume is accompanied by an appendix of slides that can be used to present this material. The slides are called out in the text

  11. NRC's geotechnical engineering research needs for the high-level waste repository program

    International Nuclear Information System (INIS)

    Gupta, D.C.; Philip, J.; Lorig, L.J.; Chowdhury, A.H.

    1992-01-01

    To develop the capability for independently assessing the US Department of Energy's (DOE's) geologic repository design within a limited time, the US Nuclear Regulatory Commission (NRC) staff needs to perform certain research well before receiving the license application. The NRC staff is using a number of factors to identify the areas that it needs to research. The staff assigns priorities to the needed research based on programmatic considerations and the significance of the work. In the geotechnical engineering field, the staff is conducting research in the following three areas: response of the repository to repeated strong ground motion, rock-mass sealing, and coupled thermo-hydro-mechanical interactions. In this paper, the NRC staff also presents the areas of additional research needed in the geotechnical engineering field

  12. 76 FR 40118 - Spring 2011 Regulatory Agenda

    Science.gov (United States)

    2011-07-07

    ... way the economy, a sector of the economy, productivity, competition, jobs, the environment, [email protected] . Steve Fruh, Environmental Protection Agency, Air and Radiation, D243-02, RTP, NC 27711, Phone: 919 541-2837, Fax: 919 541-3207, E-mail: fruh.steve@epa.gov . RIN: 2060-AP69 271...

  13. 75 FR 79843 - Fall 2010 Regulatory Agenda

    Science.gov (United States)

    2010-12-20

    ... of the economy, productivity, competition, jobs, the environment, public health or safety, or State... Steve Fruh, Environmental Protection Agency, Air and Radiation, 1200 Pennsylvania Ave, NW, Washington, DC 20460 Phone: 919 541-2837 Fax: 919 541-4991 Email: fruh.steve@epamail.epa.gov RIN: 2060-AP69...

  14. 77 FR 8004 - Fall 2011 Regulatory Agenda

    Science.gov (United States)

    2012-02-13

    ... economy, a sector of the economy, productivity, competition, jobs, the environment, public health or... . Steve Fruh, Environmental Protection Agency, Air and Radiation, D243-02, Research Triangle Park, NC 27711, Phone: 919 541-2837, Fax: 919 541-4991, Email: fruh.steve@epa.gov . RIN: 2060-AP69 ENVIRONMENTAL...

  15. Environmental Protection Agency Semiannual Regulatory Agenda

    Science.gov (United States)

    2010-12-20

    ... of the economy, productivity, competition, jobs, the environment, public health or safety, or State... Steve Fruh, Environmental Protection Agency, Air and Radiation, 1200 Pennsylvania Ave, NW, Washington, DC 20460 Phone: 919 541-2837 Fax: 919 541-4991 Email: fruh.steve@epamail.epa.gov RIN: 2060-AP69...

  16. Federal Trade Commission Semiannual Regulatory Agenda

    Science.gov (United States)

    2010-04-26

    ... 15, 2010, by the Office of Management and Budget in accordance with the provisions of Executive Order..., 16 CFR 310; (7) Children's Online Privacy Protection Rule, 16 CFR 312; (8) Privacy of Consumer... may have ``substantial direct effects on the States, on the relationship between the national...

  17. Securities and Exchange Commission Semiannual Regulatory Agenda

    Science.gov (United States)

    2010-04-26

    ...: 3235-AK58 420. REVISIONS TO REGULATION D Legal Authority: 15 USC 77b(a)(15); 15 USC 77b(b); 15 USC 77d; 15 USC 77r; 15 USC 77s; 15 USC 77s(a); 15 USC 77z-3 Abstract: The Division is considering... SOLICITATION ENHANCEMENTS Legal Authority: 15 USC 78n Abstract: The Commission proposed amendments to its proxy...

  18. 75 FR 21963 - Regulatory Flexibility Agenda

    Science.gov (United States)

    2010-04-26

    ... REGULATION D Legal Authority: 15 USC 77b(a)(15); 15 USC 77b(b); 15 USC 77d; 15 USC 77r; 15 USC 77s; 15 USC 77s(a); 15 USC 77z-3 Abstract: The Division is considering recommending that the Commission propose... Authority: 15 USC 78n Abstract: The Commission proposed amendments to its proxy rules to clarify the manner...

  19. 75 FR 79937 - Regulatory Flexibility Agenda

    Science.gov (United States)

    2010-12-20

    ... Stage Division of Corporation Finance 613. PROXY SOLICITATION ENHANCEMENTS Legal Authority: 15 USC 78n... Legal Authority: PL 111-203 sec 951; 15 USC 78c(b); 15 USC 78m; 15 USC 78n; 15 USC 78w(a); 15 USC 78mm... SHAREHOLDER DIRECTOR NOMINATIONS Legal Authority: 15 USC 78c(b); 15 USC 78m; 15 USC 78n; 15 USC 78o; 15 USC...

  20. 75 FR 79873 - Semiannual Regulatory Agenda

    Science.gov (United States)

    2010-12-20

    ... Legal Authority: 40 USC 121(c); 10 USC ch 137; 42 USC 2473(c) Abstract: The Civilian Agency Acquisition... REPORTING PROCEDURES Legal Authority: 40 USC 121(c); 10 USC ch 137; 42 USC 2473(c) Abstract: The Civilian... EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS Legal Authority: 40 USC 121(c); 10 USC ch 137; 42...

  1. 75 FR 21899 - Semiannual Regulatory Agenda

    Science.gov (United States)

    2010-04-26

    ..., SOCIOECONOMIC PROGRAM PARITY Legal Authority: 40 USC 121(c); 10 USC ch 137; 42 USC 2473(c) Abstract: The... Authority: 40 USC 121(c); 10 USC ch 137; 42 USC 2473(c) Abstract: The Civilian Agency Acquisition Council... REINVESTMENT ACT OF 2009 (THE RECOVERY ACT)--REPORTING REQUIREMENTS Legal Authority: 40 USC 121(c); 10 USC ch...

  2. 78 FR 1698 - Semiannual Regulatory Flexibility Agenda

    Science.gov (United States)

    2013-01-08

    ...: Standardized Approach for Risk-weighted Assets; Market Discipline and Disclosure Requirements (Docket No. R... Discipline and Disclosure Requirements (Docket R-1443) Legal Authority: 12 U.S.C. 248(a); 12 U.S.C. 321; 12 U... counterparty credit risk. The NPRM also would introduce disclosure requirements that would apply to top-tier...

  3. Department of Treasury Semiannual Regulatory Agenda

    Science.gov (United States)

    2010-04-26

    ... from the abuses of terrorist financing, money laundering, and other financial crime. The proposed... money laundering, terrorist financing, and other illicit transactions through the financial system. This... services posing lower risks of money laundering and terrorist financing from certain requirements. FinCEN...

  4. 78 FR 1708 - Regulatory Flexibility Agenda

    Science.gov (United States)

    2013-01-08

    ... and Sale of Securities Through Crowdfunding Under Section 4(6) of the Securities Act of 1933. 534... Rule Stage 533. Rules Governing the Offer and Sale of Securities Through Crowdfunding Under Section 4(6... securities through crowdfunding under new section 4(6) of the Securities Act. Timetable: Action Date FR Cite...

  5. 78 FR 44407 - Regulatory Flexibility Agenda

    Science.gov (United States)

    2013-07-23

    ... Offer 3235-AL37 and Sale of Securities Through Crowdfunding Under Section 4(6) of the Securities Act of... Governing the Offer and Sale of Securities Through Crowdfunding Under Section 4(6) of the Securities Act of... of the JOBS Act by prescribing rules governing the offer and sale of securities through crowdfunding...

  6. Federal Communications Commission Semiannual Regulatory Agenda

    Science.gov (United States)

    2010-04-26

    ... Implementing the Controlling the Assault of Non-Solicited 3060-AI20 Pornography and Marketing Act of 2003 (CG... Digital Audio Radio Satellite Service in 3060-AF93 the 2310-2360 MHz Frequency Band (IB Docket No. 95-91... Horizontal and Vertical Ownership Limits (MM Docket No. 92-264) 3060-AH09 335 Digital Audio Broadcasting...

  7. 76 FR 40136 - Semiannual Regulatory Agenda

    Science.gov (United States)

    2011-07-07

    ... Policy Directive Legal Authority: 15 U.S.C. 638 Abstract: SBA plans to update the SBIR Policy Directive... proposal for a contract and that if the percentage is not met, the large business prime contractor must...

  8. 78 FR 44247 - Semiannual Regulatory Agenda

    Science.gov (United States)

    2013-07-23

    ... published previously a final rule establishing energy conservation standards for ice-cream freezers, self... and to add a test for measuring ice maker energy use. Timetable: Action Date FR Cite NPRM 07/00/13...

  9. 78 FR 44399 - Semiannual Regulatory Flexibility Agenda

    Science.gov (United States)

    2013-07-23

    ... Reserve Board (the Board) proposed amendments to Regulation CC to facilitate the banking industry's... afforded to a paying bank to decide whether to pay a check in order to reduce the risk to a depositary bank... their risk-based and leverage capital requirements consistent with agreements reached by the Basel...

  10. Department of Labor Semiannual Regulatory Agenda

    Science.gov (United States)

    2010-12-20

    ... reduce or eliminate the amount of diacetyl in some kinds of flavorings, foods, and beverages. They have.... Hilda L. Solis, Secretary of Labor. Office of Labor-Management Standards--Proposed Rule Stage Regulation... in part II of this issue of the Federal Register. Office of Labor-Management Standards--Completed...

  11. 78 FR 44341 - Semiannual Regulatory Agenda

    Science.gov (United States)

    2013-07-23

    ... Council and the Office of Federal Procurement Policy, in consultation with the Office of Government Ethics..., Office of Acquisition Policy and Senior Procurement Executive. DOD/GSA/NASA (FAR)--Proposed Rule Stage... Credit. 277 Federal Acquisition 9000-AM60 Regulation; FAR Case 2012- 023, Uniform Procurement...

  12. 78 FR 1646 - Semiannual Regulatory Agenda

    Science.gov (United States)

    2013-01-08

    ... Federal Procurement Policy, in consultation with the Office of Government Ethics. This proposed rule was... Acquisition Policy and Senior Procurement Executive. DOD/GSA/NASA (FAR)--Proposed Rule Stage Regulation... Analysis Required: Yes. Agency Contact: Edward Chambers, Procurement Analyst, DOD/GSA/NASA (FAR), 1275...

  13. 78 FR 44349 - Semiannual Regulatory Agenda

    Science.gov (United States)

    2013-07-23

    ... Federal Reserve System (Board) over certain consumer-related EFA Act provisions. The Board proposed... principal place of business; the gross annual revenue; and the race, sex, and ethnicity of the principal... depository institutions; mandatory arbitration; and the financing of single- premium credit insurance. The...

  14. Department of Transportation Agency Semiannual Regulatory Agenda

    Science.gov (United States)

    2010-12-20

    ... result in more effective public participation. This publication in the Federal Register does not impose... contracting issues associated with subcontracting with Small Business, Small Disadvantaged Business, and Women... and Water Efficiency, Renewable Energy Technologies, Occupational Safety, and Drug-Free Workplace...

  15. Department of Agriculture Semiannual Regulatory Agenda

    Science.gov (United States)

    2010-12-20

    ... Import Restrictions on Certain 0579-AC74 Live Fish 189 Scrapie in Sheep and Goats 0579-AC92 190 Plant..., Farming Experience as an Eligibility Requirement; 5201, Eligibility of Equine Farmers and Ranchers for... Phone: 301 734-8695 RIN: 0579-AC74 189. SCRAPIE IN SHEEP AND GOATS Legal Authority: 7 USC 8301 to 8317...

  16. 78 FR 1652 - Semiannual Regulatory Agenda

    Science.gov (United States)

    2013-01-08

    ... concerning small, women-owned, or minority-owned business lending. The CFPB has also inherited proposed rules... Regulation Z's current loan originator compensation provisions, including a new additional restriction on the... implements Dodd-Frank Act restrictions on mandatory arbitration and the financing of certain credit insurance...

  17. Department of Commerce Semiannual Regulatory Agenda

    Science.gov (United States)

    2010-04-26

    ... Turtle 92 Critical Habitat Designation for Cook Inlet Beluga Whale Under the Endangered Species 0648-AX50... (including gear impacts on Loligo squid egg EFH); and (4) possible limitations on at- sea processing of...

  18. Department of Homeland Security Semiannual Regulatory Agenda

    Science.gov (United States)

    2010-12-20

    ... abandoned and help prevent future marine pollution. This rulemaking supports the Coast Guard's broad role... overloading or operating these vessels in hazardous weather conditions. This rulemaking would support the Coast Guard's broad role and responsibility of maritime safety. Timetable: Action Date FR Cite NPRM 08...

  19. Department of Agriculture Semiannual Regulatory Agenda

    Science.gov (United States)

    2010-04-26

    ... Program: Dairy Replacement Animals (Livestock) 0581-AC69 2 National Organic Program, Sunset (2011) (Crops... Sequence Title Identifier Number Number 3 National Dairy Promotion and Research Program; Dairy Import... Identifier Number Number 5 National Organic Program: Access to Pasture, TM-05-14 0581-AC57 Farm Service...

  20. Environmental Protection Agency Semiannual Regulatory Agenda

    Science.gov (United States)

    2010-04-26

    ... more easily and live more healthy lives. Building on that, EPA will develop a comprehensive strategy... stakeholders working with us to identify the most practical and effective solutions to problems, and we stress...; Under the Federal Food, Drug, and Cosmetic Act: Actions regarding pesticide tolerances and food additive...

  1. 78 FR 1636 - Semiannual Regulatory Agenda

    Science.gov (United States)

    2013-01-08

    ... owned and controlled by women, or on women planning to start a business, especially women who are... Vol. 78 Tuesday, No. 5 January 8, 2013 Part XVIII Small Business Administration Semiannual...; [[Page 1636

  2. 78 FR 44331 - Semiannual Regulatory Agenda

    Science.gov (United States)

    2013-07-23

    ... start a business, especially women who are economically or socially disadvantaged. The training and... Vol. 78 Tuesday, No. 141 July 23, 2013 Part XIX Small Business Administration Semiannual...; [[Page 44332

  3. Federal Communications Commission Semiannual Regulatory Agenda

    Science.gov (United States)

    2010-12-20

    ... Telecommunications Act of 1996 (CC Docket Nos. 96-146, 93-22)......... 498 Implementation of the Subscriber Selection... Regarding AM Radio Service 3060-AJ17 Directional Antenna Performance Verification (MM Docket No. 93-177) 545... 498. IMPLEMENTATION OF THE SUBSCRIBER SELECTION CHANGES PROVISION OF THE TELECOMMUNICATIONS ACT OF...

  4. 75 FR 79863 - Semiannual Regulatory Agenda

    Science.gov (United States)

    2010-12-20

    ... Actions Regulation Sequence Title Identifier Number Number 487 Women's Business Center Program 3245-AG02... Women-Owned Small Business Federal Contract Program 3245-AG06 Small Business Administration (SBA... qualification, certification, or period of participation imposed under the Small Business Act on any program...

  5. Department of Labor Semiannual Regulatory Agenda

    Science.gov (United States)

    2010-04-26

    ..., consistent with the increasing emphasis on flexiplace and telecommuting, to allow for automated or electronic... development of adverse health effects; exposure assessment and monitoring methods; exposure control methods... assess current exposures and control methods being used to reduce employee exposures to beryllium. OSHA...

  6. Department of Commerce Semiannual Regulatory Agenda

    Science.gov (United States)

    2010-12-20

    ... the Assistant General Counsel for Legislation and Regulation, U.S. Department of Commerce, Washington... Commerce, National Oceanic and Atmospheric Administration, Building 1, 7600 Sand Point Way NE., Seattle, WA... Commerce, National Oceanic and Atmospheric Administration, 7600 Sand Point Way NE., Seattle, WA 98115 Phone...

  7. 76 FR 40082 - Semiannual Regulatory Agenda

    Science.gov (United States)

    2011-07-07

    ... are: Indian python (including Burmese python), reticulated python, Northern African python, Southern African python, boa constrictor, yellow anaconda, DeSchauensee's anaconda, green anaconda, and Beni... Required: Yes. Agency Contact: Art Roybal, Senior Fish and Wildlife Biologist, Department of the Interior...

  8. Small Business Administration Semiannual Regulatory Agenda

    Science.gov (United States)

    2010-04-26

    ... Strategic Planning, Small Business Administration, 409 Third Street SW, Washington, DC 20416 Phone: 202 205... Protest and Appeal Regulations 294 Small Business Size Standards: Retail Trade Industries 3245-AF69 295... STANDARDS: RETAIL TRADE INDUSTRIES Legal Authority: 15 USC 632(a) Abstract: The U.S. Small Business...

  9. Department of Justice Semiannual Regulatory Agenda

    Science.gov (United States)

    2010-12-20

    ... design and construction of accessible facilities that are consistent with the ADA Accessibility..., the social and economic realities faced by Americans with disabilities dictate the need for the rule...

  10. Federal Deposit Insurance Corporation Semiannual Regulatory Agenda

    Science.gov (United States)

    2010-12-20

    ... financial institutions in cooperation with minority- and women-owned financial institutions and low-income... Financial Assets Transferred by an Insured Depository Institution: The Federal Deposit Insurance Corporation...: Market Risk: The OCC, Board and the FDIC proposed revisions to the market risk capital rule to enhance...

  11. Department of Homeland Security Semiannual Regulatory Agenda

    Science.gov (United States)

    2010-04-26

    ... NUMERICAL LIMITATIONS Legal Authority: 8 USC 1184(g) Abstract: The Department of Homeland Security is... Stage Transportation Security Administration (TSA) 197. AIRCRAFT REPAIR STATION SECURITY Legal Authority.... MODIFICATION OF THE AVIATION SECURITY INFRASTRUCTURE FEE (ASIF) (MARKET SHARE) Legal Authority: 49 USC 44901...

  12. Securities and Exchange Commission Semiannual Regulatory Agenda

    Science.gov (United States)

    2010-12-20

    ... Flexibility Analysis Required: Yes Agency Contact: Alicia Goldin, Division of Trading and Markets, Securities...: Alicia Goldin, Division of Trading and Markets, Securities and Exchange Commission, 100 F Street NE... Flexibility Analysis Required: Yes Agency Contact: Alicia Goldin, Division of Trading and Markets, Securities...

  13. 76 FR 40208 - Regulatory Flexibility Agenda

    Science.gov (United States)

    2011-07-07

    ...: Yes. Agency Contact: Alicia Goldin, Division of Trading and Markets, Securities and Exchange... Analysis Required: Yes. Agency Contact: Alicia Goldin, Division of Trading and Markets, Securities and... Flexibility Analysis Required: Yes. Agency Contact: Alicia Goldin, Division of Trading and Markets, Securities...

  14. NRC licensing criteria for portable radwaste systems

    International Nuclear Information System (INIS)

    Hayes, J.J. Jr.

    1983-01-01

    The shortcomings of various components of the liquid and solid radwaste systems at nuclear power reactors has resulted in the contracting of the functions performed by these systems to various contractors who utilize portable equipment. In addition, some streams, for which treatment was not originally anticipated, have been processed by portable equipment. The NRC criteria applicable to portable liquid and solid radwaste systems is presented along with discussion on what is required to provide an adequate 10 CFR Part 50.59 review for those situations where changes are made to an existing system. The criteria the NRC is considering for facilities which may intend to utilize portable incinerators is also presented

  15. NRC proposes changes to nuke decommissioning funding rules

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    The Nuclear Regulatory Commission (NRC) has proposed to amend its regulations to allow self-guarantee as a means of assuring adequate funding for nuclear plant decommissioning. It acted in response to a rulemaking petition filed by General Electric Co. and Westinghouse Electric Corp. The proposal would allow self-guarantees if certain conditions are met: Tangible net worth of at least $1 billion; Tangible net worth at least 10 times the present decommissioning cost estimate for all activities the utility is responsible for as a self-guaranteeing licensee and as parent guarantor; Domestic assets amounting to at least 90 percent of total assets or at least 10 times the present decommissioning cost estimate; A credit rating for the utility's most recent bond issuance of AAA, AA, or A (Standard ampersand Poor's), or Aaa, Aa, or A (Moody's). Additional requirements include that the utility licensee must have at least one class of equity securities registered under the Securities Exchange Act of 1934, and that an independent auditor must verify that the utility met the financial test. A utility also would be responsible for reporting any change in circumstances affecting the criteria used to meet the financial test, and would be responsible for meeting that test within 90 days of each financial year. The NRC will accept written comments until March 29, 1993

  16. MHTGR demonstration role in the NRC design certification process

    International Nuclear Information System (INIS)

    Kelley, A.P. Jr.; Jones, G.

    1986-01-01

    A modular high-temperature gas-cooled reactor (MHTGR) design is being developed by the US HTGR Program. Because of the small size of the individual modules that would make up a commercial facility, it appears feasible to design and construct a single-module demonstration plant within the funding constraints on the public and private-sector program participants. Furthermore, the safety margins that can be made inherent to the design permit full-scale testing that could supply a new basis for demonstrating investment protection and safety adequacy to the public, the US Nuclear Regulatory Commission (NRC), and potential users. With this in mind, a Project Definition Study was sponsored by Gas-Cooled Reactor Associates and the Tennessee Valley Authority to study the potential benefits of undertaking such a demonstration project. One of the areas investigated was the potential benefits of such a facility in supporting the NRC design certification process, which is envisioned as a necessary commercialization step for the MHTGR

  17. The evolution of the structure and application of U.S. NRC regulations and standards

    International Nuclear Information System (INIS)

    Murley, T.E.; Rosztoczy, Z.R.; McPherson, G.D.

    1991-01-01

    NRC regulations and standards and their implementation have evolved from early adaptations of conventional engineering practices to a mature, cohesive set of regulations that govern NRC regulation of nuclear power plant safety in the United States. From a simple set of rules and design criteria and from the standards of the professional engineering societies, a hierarchy of practices, standards, guides, rules and goals has developed. Resting on a foundation of industrial practices, this hierarchy rises through levels of national standards, regulatory guides and standard review plans, policy statements and NRC regulations. The licensing process is evolving today toward one that permits both site approval and standard design certification before the plant is constructed. At the present time, NRC is reviewing five standard designs for certification for a period of 15 years. NRC focuses its regulation of operating nuclear plants on inspections conducted from five regional offices. Resident inspectors, specialist inspectors, and multi-disciplinary inspection teams examine specific plant situations. The results of all these inspections are used to develop a complete understanding of a plant's physical condition, its operation, maintenance and management. To improve safe operation of nuclear plants in the U.S., a most important program, the Systematic Assessment of Licensee Performance, measures operational performance, using a broad spectrum of functional areas. (orig.)

  18. NRC comprehensive records disposition schedule. Revision 3

    International Nuclear Information System (INIS)

    1998-02-01

    Title 44 US Code, ''Public Printing and Documents,'' regulations issued by the General Service Administration (GSA) in 41 CFR Chapter 101, Subchapter B, ''Management and Use of Information and Records,'' and regulations issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter 12, Subchapter B, ''Records Management,'' require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA's General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate duration of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 3, contains ''NRC's Comprehensive Records Disposition Schedule,'' and the original authorized approved citation numbers issued by NARA. Rev. 3 incorporates NARA approved changes and additions to the NRC schedules that have been implemented since the last revision dated March, 1992, reflects recent organizational changes implemented at the NRC, and includes the latest version of NARA's General Records Schedule (dated August 1995)

  19. NRC/AMRMC Resident Research Associateship Program

    Science.gov (United States)

    2015-05-01

    maintaining a presence on social media sites such as Facebook . The NRC attended a number of minority focused events in which we maintained exhibit booths...PROPOSAL The Use of Glial Inhibitors to Increase the Efficacy of Opioid Analgesics while Eliminating the Propensity for Addiction 7) SUMMARY OF RESEARCH

  20. 77 FR 33786 - NRC Enforcement Policy Revision

    Science.gov (United States)

    2012-06-07

    ... methods: Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2011... search, select ``ADAMS Public Documents'' and then select ``Begin Web- based ADAMS Search.'' For problems... either 2.3.2.a. or b. must be met for the disposition of a violation as an NCV.'' The following new...

  1. NRC TLD Direct Radiation Monitoring Network

    International Nuclear Information System (INIS)

    Struckmeyer, R.

    1994-03-01

    This report presents the results of the NRC Direct Radiation Monitoring Network for the fourth quarter of 1993. It provides the ambient radiation levels measured in the vicinity of 75 sites throughout the United States. In addition, it describes the equipment used, monitoring station selection criteria, characterization of the dosimeter response, calibration procedures, statistical methods, intercomparison, and quality assurance program

  2. NRC TLD Direct Radiation Monitoring Network

    International Nuclear Information System (INIS)

    Struckmeyer, R.; McNamara, N.

    1993-03-01

    This report present the results of the NRC Direct Radiation Monitoring Network for the fourth quarter of 1992. It provides the ambient radiation levels measured in the vicinity of 75 sites throughout the United States. In addition, it describes the equipment used, monitoring station selection criteria, characterization of the dosimeter response, calibration procedures, statistical methods, intercomparison, and quality assurance program

  3. 48 CFR 2009.100 - NRC policy.

    Science.gov (United States)

    2010-10-01

    ... noncompetitive award of contracts to organizations where former NRC employees have dominant management interests...) Contracts awarded noncompetitively under the Small Business Administration's 8(a) Program; (2) Individual... consulting with the Executive Director for Operations. This is in addition to any justification and approvals...

  4. 76 FR 48919 - NRC Enforcement Policy

    Science.gov (United States)

    2011-08-09

    .... In all such cases when a licensee determines that an unplanned change during construction associated..., States, members of the public, and the regulated industry (i.e., reactor and materials licensees, vendors, and contractors), on construction-related topics addressed in this notice that the NRC staff is...

  5. NRC comprehensive records disposition schedule. Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    Title 44 US Code, ``Public Printing and Documents,`` regulations issued by the General Service Administration (GSA) in 41 CFR Chapter 101, Subchapter B, ``Management and Use of Information and Records,`` and regulations issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter 12, Subchapter B, ``Records Management,`` require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA`s General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate duration of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 3, contains ``NRC`s Comprehensive Records Disposition Schedule,`` and the original authorized approved citation numbers issued by NARA. Rev. 3 incorporates NARA approved changes and additions to the NRC schedules that have been implemented since the last revision dated March, 1992, reflects recent organizational changes implemented at the NRC, and includes the latest version of NARA`s General Records Schedule (dated August 1995).

  6. Spent nuclear fuel project multi-canister overpack, additional NRC requirements

    International Nuclear Information System (INIS)

    Garvin, L.J.

    1998-01-01

    The US Department of Energy (DOE), established in the K Basin Spent Nuclear Fuel Project Regulatory Policy, dated August 4, 1995 (hereafter referred to as the Policy), the requirement for new Spent Nuclear Fuel (SNF) Project facilities to achieve nuclear safety equivalency to comparable US Nuclear Regulatory Commission (NRC)-licensed facilities. For activities other than during transport, when the Multi-Canister Overpack (MCO) is used and resides in the Canister Storage Building (CSB), Cold Vacuum Drying (CVD) facility or Hot Conditioning System, additional NRC requirements will also apply to the MCO based on the safety functions it performs and its interfaces with the SNF Project facilities. An evaluation was performed in consideration of the MCO safety functions to identify any additional NRC requirements needed, in combination with the existing and applicable DOE requirements, to establish nuclear safety equivalency for the MCO. The background, basic safety issues and general comparison of NRC and DOE requirements for the SNF Project are presented in WHC-SD-SNF-DB-002

  7. Plan for reevaluation of NRC policy on decommissioning of nuclear facilities

    International Nuclear Information System (INIS)

    1978-12-01

    The present decommissioning regulations contained in Sections 50.33(f) and 50.82 of 10 CFR part 50 require applicants for power reactor operating licenses to demonstrate that they can obtain the funds needed to meet both operating costs and estimated costs of shutdown and decommissioning. The development of detailed, specific decommissioning plans for nuclear power plants is not currently required until the licensee seeks to terminate his operating license. Recognizing that the current generation of large commercial reactors and supporting nuclear facilities would substantially increase the need for future decommissionings, the NRC staff began an in-depth review and reevaluation of NRC's regulatory approach to decommissioning in 1975. The Nuclear Regulatory Commission is now considering development of a more explicit overall policy for nuclear facility decommissioning and amending its regulations in 10 CFR Parts 30, 40, 50, and 70 to include more specific guidance on decommissioning criteria for production and utilization facility licensees and byproduct, source, and special nuclear material licensees. In response to comments from the public and states, and to information gained during the initial stage of execution of the plan, several modifications of the plan are now required. The revised overall report sets forth in detail the current NRC staff plan for the development of an overall NRC policy on decommissioning of nuclear facilities

  8. The participatory agenda

    DEFF Research Database (Denmark)

    Kortbek, Hjørdis Brandrup; Schwartz, Charlotte Præstegaard; Sørensen, Anne Scott

    2016-01-01

    of a “radical democracy” (Mouffe, 2014) and the “radical institution” (Bishop, 2013), respectively, we focus on key terms in the participatory agenda such as “access”, “agency” and “ownership”, and pursue a conceptual intervention in terms of a “post-critical”, “anticipatory” analysis and practice (Rogoff......In this article we address the participatory agenda defined as outreach in Danish national cultural policies, tracing specificities to other Nordic and EU cultural policies as well (Bell & Oakley 2015). The article investigates the discursive link that these policies establish between participation......, democracy and transformation, and argue that a range of paradoxes emerge once the agenda is translated at local cultural policy levels or by different institutions and adopted into daily practice. The thesis is that the agenda is a configuration of the “culture complex” as outlined by Tony Bennett (2013...

  9. Implementing WIPO's Development Agenda

    International Development Research Centre (IDRC) Digital Library (Canada)

    ... does not (or does no longer) reflect the real purpose of the Development Agenda. .... I appreciate their sacrifices during the time I spent writing, editing, and ... during the many days I was travelling for project-related meetings and events.

  10. NRC high-level radioactive waste program. Annual progress report: Fiscal Year 1996

    International Nuclear Information System (INIS)

    Sagar, B.

    1997-01-01

    This annual status report for fiscal year 1996 documents technical work performed on ten key technical issues (KTI) that are most important to performance of the proposed geologic repository at Yucca Mountain. This report has been prepared jointly by the staff of the Nuclear Regulatory Commission (NRC) Division of Waste Management and the Center for Nuclear Waste Regulatory Analyses. The programmatic aspects of restructuring the NRC repository program in terms of KTIs is discussed and a brief summary of work accomplished is provided. The other ten chapters provide a comprehensive summary of the work in each KTI. Discussions on probability of future volcanic activity and its consequences, impacts of structural deformation and seismicity, the nature of of the near-field environment and its effects on container life and source term, flow and transport including effects of thermal loading, aspects of repository design, estimates of system performance, and activities related to the U.S. Environmental Protection Agency standard are provided

  11. Regulatory and technical reports (abstract index journal): Annual compilation for 1994. Volume 19, Number 4

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-03-01

    This compilation consists of bibliographic data and abstracts for the formal regulatory and technical reports issued by the US Nuclear Regulatory Commission (NRC) Staff and its contractors. It is NRC`s intention to publish this compilation quarterly and to cumulate it annually. The main citations and abstracts in this compilation are listed in NUREG number order. These precede the following indexes: secondary report number index, personal author index, subject index, NRC originating organization index (staff reports), NRC originating organization index (international agreements), NRC contract sponsor index (contractor reports), contractor index, international organization index, and licensed facility index. A detailed explanation of the entries precedes each index.

  12. Proceedings of the 21st DOE/NRC nuclear air cleaning conference

    International Nuclear Information System (INIS)

    First, M.W.

    1991-02-01

    The 21st meeting of the Department of Energy/Nuclear Regulatory Commission (DOE/NRC) Nuclear Air Cleaning Conference was held in San Diego, CA on August 13--16, 1990. The proceedings have been published as a two volume set. Volume 2 contains sessions covering adsorbents, nuclear codes and standards, modelling, filters, safety, containment venting and a review of nuclear air cleaning programs around the world. Also included is the list of attendees and an index of authors and speakers

  13. PRISIM: A plant risk status information management system for NRC inspectors

    International Nuclear Information System (INIS)

    Reilly, H.J.; Glynn, J.C.; Campbell, D.J.

    1987-01-01

    The Plant Risk Status Information Management System (PRISIM) is a microcomputer program that presents results of probabilistic risk assessments (PRAs), and related information, for use by United States Nuclear Regulatory Commission (NRC) decisionmakers. Plant-specific PRISIMs have been developed for three nuclear plants in the United States. The usefulness of PRISIM for these plants is now under evaluation, and an improved PRISIM is being developed

  14. Comparisons of ANS, ASME, AWS, and NFPA standards cited in the NRC standard review plan, NUREG-0800, and related documents

    International Nuclear Information System (INIS)

    Ankrum, A.R.; Bohlander, K.L.; Gilbert, E.R.; Spiesman, J.B.

    1995-11-01

    This report provides the results of comparisons of the cited and latest versions of ANS, ASME, AWS and NFPA standards cited in the NRC Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants (NUREG 0800) and related documents. The comparisons were performed by Battelle Pacific Northwest Laboratories in support of the NRC's Standard Review Plan Update and Development Program. Significant changes to the standards, from the cited version to the latest version, are described and discussed in a tabular format for each standard. Recommendations for updating each citation in the Standard Review Plan are presented. Technical considerations and suggested changes are included for related regulatory documents (i.e., Regulatory Guides and the Code of Federal Regulations) citing the standard. The results and recommendations presented in this document have not been subjected to NRC staff review

  15. 10 CFR 2.1505 - Role of the NRC staff.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Role of the NRC staff. 2.1505 Section 2.1505 Energy... Legislative Hearings § 2.1505 Role of the NRC staff. The NRC staff shall be available to answer any Commission or presiding officer's questions on staff-prepared documents, provide additional information or...

  16. 10 CFR 51.40 - Consultation with NRC staff.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Consultation with NRC staff. 51.40 Section 51.40 Energy....40 Consultation with NRC staff. (a) A prospective applicant or petitioner for rulemaking is encouraged to confer with NRC staff as early as possible in its planning process before submitting...

  17. 76 FR 28102 - Notice of Issuance of Regulatory Guide

    Science.gov (United States)

    2011-05-13

    ..., Probabilistic Risk Assessment Branch, Division of Risk Analysis, Office of Nuclear Regulatory Research, U.S... results of risk analyses are used to help justify regulatory action. As such, the principles, process, and... NUCLEAR REGULATORY COMMISSION [NRC-2009-0385] Notice of Issuance of Regulatory Guide AGENCY...

  18. 78 FR 44165 - Nuclear Regulatory Commission Enforcement Policy

    Science.gov (United States)

    2013-07-23

    ... NUCLEAR REGULATORY COMMISSION [NRC-2013-0159] Nuclear Regulatory Commission Enforcement Policy AGENCY: Nuclear Regulatory Commission. ACTION: Enforcement policy; request for comment. SUMMARY: The U.S... Policy. In SRM-SECY-12-0047, ``Revisions to the Nuclear Regulatory Commission Enforcement Policy,'' dated...

  19. NRC/AMRMC Resident Research Associateship Program

    Science.gov (United States)

    2018-05-01

    2- 0010 Report Period: 02/06/2012-02/28/2018 4/11/2018, 12:17 PM During the reporting period, the National Academies of Sciences, Engineering , and...to advertise the NRC Research Associateship Programs included the following: 1) attendance at meetings of major scientific and engineering ...professional societies; 2) advertising in programs and career centers for these and other professional society meetings; 3) direct mailing and emailing of

  20. NRC study of control room habitability

    International Nuclear Information System (INIS)

    Hayes, J.J. Jr.; Muller, D.R.; Gammill, W.P.

    1985-01-01

    Since 1980, the Advisory Committee on Reactor Safeguards (ACRS) has held several meetings with the NRC staff to discuss the subject of control room habitability. Several meetings between the ACRS and the staff have resulted in ACRS letters that express specific concerns, and the staff has provided responses in reports and meetings. In June of 1983, the NRC Executive Director for Operations directed the Offices of Nuclear Reactor Regulation and Inspection and Enforcement to develop a plan to handle the issues raised by the ACRS and to report to him specific proposed courses of action to respond to the ACRS's concerns. The NRC control room habitability working group has reviewed the subject in such areas as NRR review process, transformation of control room habitability designs to as-built systems, and determination of testing protocol. The group has determined that many of the ACRS concerns and recommendations are well founded, and has recommended actions to be taken to address these as well as other concerns which were raised independent of the ACRS. The review has revealed significant areas where the approach presently utilized in reviews should be altered

  1. NRC perspective on alternative disposal methods

    International Nuclear Information System (INIS)

    Pittiglio, C.L.; Tokar, M.

    1987-01-01

    In this paper is discussed an NRC staff strategy for the development of technical criteria and procedures for the licensing of various alternatives for disposal of low-level radioactive waste. Steps taken by the staff to identify viable alternative disposal methods and to comply with the requirements of the Low-Level Radioactive Waste Policy Amendments Act (LLRWPAA) of 1985 are also discussed. The strategy proposed by the NRC staff is to focus efforts in FY 87 on alternative concepts that incorporate concrete materials with soil or rock cover (e.g., below ground vaults and earth-mounded concrete bunkers), which several State and State Compacts have identified as preferred disposal options. While the NRC staff believes that other options, such as above ground vaults and mined cavities, are workable and licensable, the staff also believes, for reasons addressed in the paper, that it is in the best interest of the industry and the public to encourage standardization and to focus limited resources on a manageable number of alternative options. Therefore, guidance on above ground vaults, which are susceptible to long-term materials degradation due to climatological effects, and mined cavities, which represent a significant departure from the current experience base for low-level radioactive waste disposal, will receive minimal attention. 6 references

  2. 10 CFR Appendix N to Part 110 - Illustrative List of Lithium Isotope Separation Facilities, Plants and Equipment Under NRC's...

    Science.gov (United States)

    2010-01-01

    ..., Plants and Equipment Under NRC's Export Licensing Authority N Appendix N to Part 110 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) EXPORT AND IMPORT OF NUCLEAR EQUIPMENT AND MATERIAL Pt. 110, App. N Appendix N to Part 110—Illustrative List of Lithium Isotope Separation Facilities, Plants and Equipment...

  3. 10 CFR Appendix H to Part 110 - Illustrative List of Electromagnetic Enrichment Plant Equipment and Components Under NRC Export...

    Science.gov (United States)

    2010-01-01

    ... Equipment and Components Under NRC Export Licensing Authority H Appendix H to Part 110 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) EXPORT AND IMPORT OF NUCLEAR EQUIPMENT AND MATERIAL Pt. 110, App. H Appendix H to Part 110—Illustrative List of Electromagnetic Enrichment Plant Equipment and Components Under...

  4. Directory of certificates of compliance for radioactive materials packages. Volume 1. Summary report of NRC approved packages. Revision 6

    International Nuclear Information System (INIS)

    1983-09-01

    This directory contains a Summary Report of the US Nuclear Regulatory Commission's Approved Packages (Volume 1), all Certificates of Compliance (Volume 2), and Summary Report of NRC Approved Quality Assurance Programs (Volume 3) for Radioactive Material Packages effective September 14, 1983

  5. Directory of certificates of compliance for radioactive materials packages. Volume 1. Summary report of NRC approved packages

    International Nuclear Information System (INIS)

    1977-12-01

    Purpose of this directory is to make available a convenient source of information on packagings which have been approved by the U.S. Nuclear Regulatory Commission. This volume contains a summary report of NRC-approved packages for radioactive material packages effective Nov. 30, 1977

  6. NRC's experiment with plant personnel training: the acid test of self-regulation

    International Nuclear Information System (INIS)

    Reynolds, N.S.

    1985-01-01

    In February 1985, the US Nuclear Regulatory Commission (NRC) initiated an experiment with a form of nuclear utility self-regulation. The commissioners unanimously endorsed the nuclear utility industry's commitment to achieve self-improvement voluntarily in the area of training and qualification of nuclear plant personnel, and accepted that commitment as a basis for deferring rulemaking. In taking this action, the Commission may have signaled a marked departure from the post-Three Mile Island (TMI) era of prescriptive (and occasionally pedantic) regulatory practices to a new era of increased cooperation with nuclear utilities

  7. Summary of NRC LWR safety research programs on fuel behavior, metallurgy/materials and operational safety

    International Nuclear Information System (INIS)

    Bennett, G.L.

    1979-09-01

    The NRC light-water reactor safety-research program is part of the NRC regulatory program for ensuring the safety of nuclear power plants. This paper summarizes the results of NRC-sponsored research into fuel behavior, metallurgy and materials, and operational safety. The fuel behavior research program provides a detailed understanding of the response of nuclear fuel assemblies to postulated off-normal or accident conditions. Fuel behavior research includes studies of basic fuel rod properties, in-reactor tests, computer code development, fission product release and fuel meltdown. The metallurgy and materials research program provides independent confirmation of the safe design of reactor vessels and piping. This program includes studies on fracture mechanics, irradiation embrittlement, stress corrosion, crack growth, and nondestructive examination. The operational safety research provides direct assistance to NRC officials concerned with the operational and operational-safety aspects of nuclear power plants. The topics currently being addressed include qualification testing evaluation, fire protection, human factors, and noise diagnostics

  8. Geotechnical engineering considerations in the NRC's review of uranium mill tailings remedial action plans

    International Nuclear Information System (INIS)

    Gillen, D.M.

    1985-01-01

    To reduce potential health hazards associated with inactive uranium mill tailings sites, the Department of Energy (DOE) is presently investigating and implementing remedial actions at 24 sites in the Uranium Mill Tailings Remedial Action Program (UMTRAP). All remedial actions must be selected and performed with the concurrence of the Nuclear Regulatory Commission (NRC). This paper provides a discussion of geotechnical engineering considerations during the NRC's preconcurrence review of proposed remedial action plans. In order for the NRC staff to perform an adequate geotechnical engineering review, DOE documents must contain a presentation of the properties and stability of all in-situ and engineered soil and rock which may affect the ability of the remedial action plans to meet EPA standards for long-term stability and control. Site investigations, laboratory testing, and remedial action designs must be adequate in scope and technique to provide sufficient data for the NRC staff to independently evaluate static and dynamic stability, settlement, radon attenuation through the soil cover, durability of rock for erosion protection, and other geotechnical engineering factors

  9. Compilation of fastener testing data received in response to NRC Compliance Bulletin 87-02

    International Nuclear Information System (INIS)

    Cwalina, G.C.; Conway, J.T.; Parker, L.B.

    1989-06-01

    On November 6, 1987, the Nuclear Regulatory Commission (NRC) issued Bulletin 87-02, ''Fastener Testing to Determine Conformance With Applicable Material Specifications,'' to all holders of operating licenses or construction permits for nuclear power reactors (licensees). The bulletin was issued so that the NRC staff could gather data to determine whether counterfeit fasteners are a problem in the nuclear power industry. The bulletin requested nuclear power plant owners to determine whether fasteners obtained from suppliers and/or manufacturers for use in their facilities meet the mechanical and chemical specifications stipulated in the procurement documents. The licensees were requested to sample a minimum of 10 safety-related and 10 non-safety-related fasteners (studs, bolts, and/or cap screws) and a sample of typical nuts that would be used with each fastener and to report the testing results to the NRC. The results of this study did not indicate a safety concern relating to the use of mismarked or counterfeit fasteners in the nuclear industry, but they did indicate a nonconformance rate of 8 to 12 percent for fasteners. The NRC staff is considering taking action to improve the effectiveness of receipt inspection and testing programs for all materials at nuclear power plants

  10. Genomic Analysis of Anaerobic Respiration in the Archaeon Halobacterium sp. Strain NRC-1: Dimethyl Sulfoxide and Trimethylamine N-Oxide as Terminal Electron Acceptors†

    OpenAIRE

    Müller, Jochen A.; DasSarma, Shiladitya

    2005-01-01

    We have investigated anaerobic respiration of the archaeal model organism Halobacterium sp. strain NRC-1 by using phenotypic and genetic analysis, bioinformatics, and transcriptome analysis. NRC-1 was found to grow on either dimethyl sulfoxide (DMSO) or trimethylamine N-oxide (TMAO) as the sole terminal electron acceptor, with a doubling time of 1 day. An operon, dmsREABCD, encoding a putative regulatory protein, DmsR, a molybdopterin oxidoreductase of the DMSO reductase family (DmsEABC), and...

  11. NRC Perspectives on Waste Incidental to Reprocessing Consultations and Monitoring - 13398

    Energy Technology Data Exchange (ETDEWEB)

    McKenney, Christepher A.; Suber, Gregory F.; Felsher, Harry D.; Mohseni, Aby [U.S. Nuclear Regulatory Commission, Mail Stop T8F5, 11545 Rockville Pike, Rockville, MD 20852 (United States)

    2013-07-01

    Section 3116 of the Ronald W. Reagan National Defense Authorization Act for Fiscal Year 2005 (NDAA) requires the U.S. Department of Energy (DOE) to consult with the U.S. Nuclear Regulatory Commission (NRC) for certain non-high level waste (HLW) determinations. The NDAA also requires NRC to monitor DOE's disposal actions related to those determinations to assess compliance with NRC regulations in 10 CFR Part 61, Subpart C. The NDAA applies to DOE activities that will remain within the States of South Carolina and Idaho. DOE has chosen to, under DOE Order 435.1, engage in consultation with NRC for similar activities in the State of Washington and New York, however, the NRC has no monitoring responsibilities. In 2007, the NRC developed a draft Final Report for Interim Use entitled, NUREG-1854: NRC Staff Guidance for Activities Related to U.S. Department of Energy Waste Determinations. Since the law was enacted, the DOE and NRC have consulted on three waste determinations within the affected States: (1) the Saltstone Disposal Facility at the Savannah River Site (SRS) within the State of South Carolina in 2005, (2) the INTEC Tank Farm at the Idaho National Laboratory within the State of Idaho in 2006, and (3) the F Tank Farm at SRS in 2011. After the end of consultation and issuance by DOE of the final waste determination, monitoring began at each of these sites, including the development of monitoring plans. In addition to the NDAA sites, DOE has requested NRC consultation support on both individual tanks and the entire C Tank Farm at the Hanford Nuclear Reservation in the State of Washington. DOE also requested consultation of waste determinations performed on the melter and related feed tanks at the West Valley site in New York that would be disposed offsite. In the next few years, NRC and DOE will consult on the last of the NDAA waste determinations for a while, the H Tank Farm waste determination at SRS. DOE may identify other activities in the future but

  12. NRC Perspectives on Waste Incidental to Reprocessing Consultations and Monitoring - 13398

    International Nuclear Information System (INIS)

    McKenney, Christepher A.; Suber, Gregory F.; Felsher, Harry D.; Mohseni, Aby

    2013-01-01

    Section 3116 of the Ronald W. Reagan National Defense Authorization Act for Fiscal Year 2005 (NDAA) requires the U.S. Department of Energy (DOE) to consult with the U.S. Nuclear Regulatory Commission (NRC) for certain non-high level waste (HLW) determinations. The NDAA also requires NRC to monitor DOE's disposal actions related to those determinations to assess compliance with NRC regulations in 10 CFR Part 61, Subpart C. The NDAA applies to DOE activities that will remain within the States of South Carolina and Idaho. DOE has chosen to, under DOE Order 435.1, engage in consultation with NRC for similar activities in the State of Washington and New York, however, the NRC has no monitoring responsibilities. In 2007, the NRC developed a draft Final Report for Interim Use entitled, NUREG-1854: NRC Staff Guidance for Activities Related to U.S. Department of Energy Waste Determinations. Since the law was enacted, the DOE and NRC have consulted on three waste determinations within the affected States: (1) the Saltstone Disposal Facility at the Savannah River Site (SRS) within the State of South Carolina in 2005, (2) the INTEC Tank Farm at the Idaho National Laboratory within the State of Idaho in 2006, and (3) the F Tank Farm at SRS in 2011. After the end of consultation and issuance by DOE of the final waste determination, monitoring began at each of these sites, including the development of monitoring plans. In addition to the NDAA sites, DOE has requested NRC consultation support on both individual tanks and the entire C Tank Farm at the Hanford Nuclear Reservation in the State of Washington. DOE also requested consultation of waste determinations performed on the melter and related feed tanks at the West Valley site in New York that would be disposed offsite. In the next few years, NRC and DOE will consult on the last of the NDAA waste determinations for a while, the H Tank Farm waste determination at SRS. DOE may identify other activities in the future but largely

  13. Regulatory aspects of mixed waste

    International Nuclear Information System (INIS)

    Boyle, R.R.; Orlando, D.A.

    1990-01-01

    Mixed waste is waste that satisfies the definition of low-level radioactive waste in the Low-Level Radioactive Waste Policy Amendments Act of 1985 (LLRWPAA) and contains hazardous waste that is either: (1) listed as a hazardous waste in 40 CFR 261, Subpart D; or (2) causes the waste to exhibit any of the characteristics identified in 40 CFR 261, Subpart C. Low-level radioactive waste is defined in the LLRWPAA as radioactive material that is not high level waste, spent nuclear fuel, or byproduct material, as defined in Section 11e(2) of the Atomic Energy Act of 1954, and is classified as low-level waste by the U.S. Nuclear Regulatory Commission (NRC). This paper discusses dual regulatory (NRC and Environmental Protection Agency) responsibility, overview of joint NRC/EPA guidance, workshops, national mixed waste survey, and principal mixed waste uncertainties

  14. Nuclear Regulatory Commission Information Digest: 1993 edition

    International Nuclear Information System (INIS)

    1993-03-01

    The Nuclear Regulatory Commission Information Digest (digest) provides a summary of information about the U.S. Nuclear Regulatory Commission (NRC), NRC's regulatory responsibilities, the activities NRC licenses, and general information on domestic and worldwide nuclear energy. The digest, published annually, is a compilation of nuclear- and NRC-related data and is designed to provide a quick reference to major facts about the agency and the industry it regulates. In general, the data cover 1975 through 1992, with exceptions noted. Information on generating capacity and average capacity factor for operating U.S. commercial nuclear power reactors is obtained from monthly operating reports that are submitted directly to the NRC by the licensee. This information is reviewed by the NRC for consistency only and no independent validation and/or verification is performed. Comments and/or suggestions on the data presented are welcomed and should be directed to Karen Olive, United States Nuclear Regulatory Commission, Office of the Controller, Division of Budget and Analysis, Washington, D.C. 20555. For detailed and complete information about tables and figures, refer to the source publications

  15. Local Agenda 21 and poverty

    OpenAIRE

    Palmans, Eva; Marysse, Stefaan

    2003-01-01

    Poverty, the increasing urbanisation of poverty and the environmental degradation are major problems facing the actual world. This is reflected in international conferences and agendas, such as Local Agenda 21. This agenda is responding to the current problems by promoting sustainable development through local action and by using participatory methods. Our major concern is to reflect on the impact of the Local Agenda 21 on the reduction of poverty in a Third World context.

  16. Funding for reactor decommissioning: the NRC perspective

    International Nuclear Information System (INIS)

    Wood, R.S.

    1981-01-01

    The cost of decommissioning a nuclear power plant is discussed. Four funding approaches that have received the most attention from the NRC are: prepayment into a trust fund of estimated decommissioning funds at the start of facility operation; annual contributions into a trust fund outside the control of the utility over the estimated life of a facility; internal reserve or sinking fund amortizations over the estimated life of a facility; and insurance or other surety mechanisms used separately or in conjunction with any of the first three mechanisms

  17. Regulatory and technical reports (abstract index journal): Annual compilation for 1996, Volume 21, No. 4

    Energy Technology Data Exchange (ETDEWEB)

    Sheehan, M.A.

    1997-04-01

    This compilation is the annual cumulation of bibliographic data and abstracts for the formal regulatory and technical reports issued by the U.S. Nuclear Regulatory Commission (NRC) Staff and its contractors.

  18. Regulatory and technical reports (abstract index journal): Annual compilation for 1996, Volume 21, No. 4

    International Nuclear Information System (INIS)

    Sheehan, M.A.

    1997-04-01

    This compilation is the annual cumulation of bibliographic data and abstracts for the formal regulatory and technical reports issued by the U.S. Nuclear Regulatory Commission (NRC) Staff and its contractors

  19. 77 FR 12089 - Proposed Generic Communication; Regulatory Issue Summary 2012-XX: Developing Inservice Testing...

    Science.gov (United States)

    2012-02-28

    ... NUCLEAR REGULATORY COMMISSION [NRC-2012-0048] Proposed Generic Communication; Regulatory Issue... CFR) Part 52, ``Licenses, Certifications, and Approvals for Nuclear Power Plants,'' to satisfy the... inservice testing programs during the initial 120-month program interval following nuclear power plant...

  20. AGENDA 2030. NEW PERSPECTIVES

    Directory of Open Access Journals (Sweden)

    Edith Mihaela DOBRESCU

    2017-04-01

    Full Text Available Agenda 2030 has set up a global partnership revitalized which has facilitating involvement intensive worldwide in support of the implementation of all objectives and targets, bringing together governments, civil society, private sector, United Nations system and other stakeholders and mobilizing all available resources.

  1. The Unfinished Agenda.

    Science.gov (United States)

    Phillips, Madge

    1981-01-01

    Items on the unfinished agendas of society, education, and physical education include: (1) the war on human suffering; (2) the paradox of education as the equalizer of social differences, although it recognizes individual merit based on academic excellence; and (3) physical education as an agent of social change and responsibility. (JN)

  2. An implementation research agenda

    Directory of Open Access Journals (Sweden)

    Marteau Theresa

    2009-04-01

    Full Text Available Abstract In October 2006, the Chief Medical Officer (CMO of England asked Professor Sir John Tooke to chair a High Level Group on Clinical Effectiveness in response to the chapter 'Waste not, want not' in the CMOs 2005 annual report 'On the State of the Public Health'. The high level group made recommendations to the CMO to address possible ways forward to improve clinical effectiveness in the UK National Health Service (NHS and promote clinical engagement to deliver this. The report contained a short section on research needs that emerged from the process of writing the report, but in order to more fully identify the relevant research agenda Professor Sir John Tooke asked Professor Martin Eccles to convene an expert group – the Clinical Effectiveness Research Agenda Group (CERAG – to define the research agenda. The CERAG's terms of reference were 'to further elaborate the research agenda in relation to pursuing clinically effective practice within the (UK National Health Service'. This editorial presents the summary of the CERAG report and recommendations.

  3. An implementation research agenda

    Science.gov (United States)

    Eccles, Martin P; Armstrong, David; Baker, Richard; Cleary, Kevin; Davies, Huw; Davies, Stephen; Glasziou, Paul; Ilott, Irene; Kinmonth, Ann-Louise; Leng, Gillian; Logan, Stuart; Marteau, Theresa; Michie, Susan; Rogers, Hugh; Rycroft-Malone, Jo; Sibbald, Bonnie

    2009-01-01

    In October 2006, the Chief Medical Officer (CMO) of England asked Professor Sir John Tooke to chair a High Level Group on Clinical Effectiveness in response to the chapter 'Waste not, want not' in the CMOs 2005 annual report 'On the State of the Public Health'. The high level group made recommendations to the CMO to address possible ways forward to improve clinical effectiveness in the UK National Health Service (NHS) and promote clinical engagement to deliver this. The report contained a short section on research needs that emerged from the process of writing the report, but in order to more fully identify the relevant research agenda Professor Sir John Tooke asked Professor Martin Eccles to convene an expert group – the Clinical Effectiveness Research Agenda Group (CERAG) – to define the research agenda. The CERAG's terms of reference were 'to further elaborate the research agenda in relation to pursuing clinically effective practice within the (UK) National Health Service'. This editorial presents the summary of the CERAG report and recommendations. PMID:19351400

  4. US Nuclear Regulatory Commission organization charts and functional statements

    International Nuclear Information System (INIS)

    1997-01-01

    This document contains organization charts for the U.S. Nuclear Regulatory Commission (NRC) and for the five offices of the NRC. Function statements are provided delineating the major responsibilities and operations of each office. Organization and function are provided to the branch level. The head of each office, division, and branch is also listed

  5. 75 FR 48382 - Draft Regulatory Guide: Issuance, Availability

    Science.gov (United States)

    2010-08-10

    .... Introduction The U.S. Nuclear Regulatory Commission (NRC) is issuing for public comment a draft guide in the... provides text and image files of NRC's public documents. If you do not have access to ADAMS or if there are... analysis may be found in ADAMS under Accession No. ML101740327. Federal Rulemaking Web site: Public...

  6. 75 FR 53352 - Draft Regulatory Guide: Issuance, Availability

    Science.gov (United States)

    2010-08-31

    ..., telephone: (301) 251- 7483 or e-mail [email protected] . SUPPLEMENTARY INFORMATION: I. Introduction... image files of NRC's public documents. If you do not have access to ADAMS or if there are problems in... Reading Room at http://www.nrc.gov/reading-rm/doc-collections/ . The regulatory analysis may be found in...

  7. 76 FR 10917 - Draft Regulatory Guide: Issuance, Availability

    Science.gov (United States)

    2011-02-28

    ..., telephone: 301-251- 7627 or e-mail: [email protected] . SUPPLEMENTARY INFORMATION: I. Introduction The... . From this page, the public can gain entry into ADAMS, which provides text and image files of NRC's....nrc.gov/reading-rm/doc-collections/ . The regulatory analysis may be found in ADAMS under Accession No...

  8. US Nuclear Regulatory Commission organization charts and functional statements

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-11-01

    This document contains organization charts for the U.S. Nuclear Regulatory Commission (NRC) and for the five offices of the NRC. Function statements are provided delineating the major responsibilities and operations of each office. Organization and function are provided to the branch level. The head of each office, division, and branch is also listed.

  9. Regulatory and technical reports (abstract index journal). Compilation for third quarter 1997, July--September

    International Nuclear Information System (INIS)

    Stevenson, L.L.

    1998-01-01

    This compilation consists of bibliographic data and abstracts for the formal regulatory and technical reports issued by the US Nuclear Regulatory Commission (NRC) Staff and its contractors. It is NRC's intention to publish this compilation quarterly and to cumulate it annually. This report contains the third quarter 1997 abstracts

  10. Regulatory and technical reports (abstract index journal). Annual compilation for 1984. Volume 9, No. 4

    International Nuclear Information System (INIS)

    1985-01-01

    This compilation consists of bibliographic data and abstracts for the formal regulatory and technical reports issued by the US Nuclear Regulatory Commission (NRC) Staff and its contractors. It is NRC's intention to publish this compilation quarterly and to cumulate it annually

  11. Regulatory and technical reports (abstract index journal): Annual compilation for 1987

    International Nuclear Information System (INIS)

    1988-03-01

    This compilation consists of bibliographic data and abstracts for the formal regulatory and technical reports issued by the US Nuclear Regulatory Commission (NRC) Staff and its contractors. It is NRC's intention to publish this compilation quarterly and to cumulate it annually

  12. 78 FR 55117 - Ultimate Heat Sink for Nuclear Power Plants; Draft Regulatory Guide

    Science.gov (United States)

    2013-09-09

    ... NUCLEAR REGULATORY COMMISSION [NRC-2013-0203] Ultimate Heat Sink for Nuclear Power Plants; Draft... (DG), DG-1275, ``Ultimate Heat Sink for Nuclear Power Plants.'' This regulatory guide (RG) describes methods and procedures acceptable to the NRC staff that nuclear power plant facility licensees and...

  13. SU-A-210-02: Medical Physics Opportunities at the NRC

    International Nuclear Information System (INIS)

    Abogunde, M.

    2015-01-01

    The purpose of this student annual meeting is to address topics that are becoming more relevant to medical physicists, but are not frequently addressed, especially for students and trainees just entering the field. The talk is divided into two parts: medical billing and regulations. Hsinshun Wu – Why should we learn radiation oncology billing? Many medical physicists do not like to be involved with medical billing or coding during their career. They believe billing is not their responsibility and sometimes they even refuse to participate in the billing process if given the chance. This presentation will talk about a physicist’s long career and share his own experience that knowing medical billing is not only important and necessary for every young medical physicist, but that good billing knowledge could provide a valuable contribution to his/her medical physics development. Learning Objectives: The audience will learn the basic definition of Current Procedural Terminology (CPT) codes performed in a Radiation Oncology Department. Understand the differences between hospital coding and physician-based or freestanding coding. Apply proper CPT coding for each Radiation Oncology procedure. Each procedure with its specific CPT code will be discussed in detail. The talk will focus on the process of care and use of actual workflow to understand each CPT code. Example coding of a typical Radiation Oncology procedure. Special procedure coding such as brachytherapy, proton therapy, radiosurgery, and SBRT. Maryann Abogunde – Medical physics opportunities at the Nuclear Regulatory Commission (NRC) The NRC’s responsibilities include the regulation of medical uses of byproduct (radioactive) materials and oversight of medical use end-users (licensees) through a combination of regulatory requirements, licensing, safety oversight including inspection and enforcement, operational experience evaluation, and regulatory support activities. This presentation will explore the

  14. SU-A-210-02: Medical Physics Opportunities at the NRC

    Energy Technology Data Exchange (ETDEWEB)

    Abogunde, M. [U.S. Nuclear Regulatory Commission (United States)

    2015-06-15

    The purpose of this student annual meeting is to address topics that are becoming more relevant to medical physicists, but are not frequently addressed, especially for students and trainees just entering the field. The talk is divided into two parts: medical billing and regulations. Hsinshun Wu – Why should we learn radiation oncology billing? Many medical physicists do not like to be involved with medical billing or coding during their career. They believe billing is not their responsibility and sometimes they even refuse to participate in the billing process if given the chance. This presentation will talk about a physicist’s long career and share his own experience that knowing medical billing is not only important and necessary for every young medical physicist, but that good billing knowledge could provide a valuable contribution to his/her medical physics development. Learning Objectives: The audience will learn the basic definition of Current Procedural Terminology (CPT) codes performed in a Radiation Oncology Department. Understand the differences between hospital coding and physician-based or freestanding coding. Apply proper CPT coding for each Radiation Oncology procedure. Each procedure with its specific CPT code will be discussed in detail. The talk will focus on the process of care and use of actual workflow to understand each CPT code. Example coding of a typical Radiation Oncology procedure. Special procedure coding such as brachytherapy, proton therapy, radiosurgery, and SBRT. Maryann Abogunde – Medical physics opportunities at the Nuclear Regulatory Commission (NRC) The NRC’s responsibilities include the regulation of medical uses of byproduct (radioactive) materials and oversight of medical use end-users (licensees) through a combination of regulatory requirements, licensing, safety oversight including inspection and enforcement, operational experience evaluation, and regulatory support activities. This presentation will explore the

  15. First update to the US Nuclear Regulatory Commission's regulatory strategy for the high-level waste repository program

    International Nuclear Information System (INIS)

    Johnson, R.L.; Linehan, J.J.

    1991-01-01

    The US Nuclear Regulatory Commission (NRC) staff has updated its initial regulatory strategy for the High-Level Waste Repository Licensing Program. The update describes changes to the initial strategy and summarizes progress and future activities. This paper summarizes the first update of the regulatory strategy. In general the overall strategy of identifying and reducing uncertainties is unchanged. Identifying regulatory and institutional uncertainties is essentially complete, and therefore, the current and future emphasis is on reducing those regulatory and institutional uncertainties identified to date. The NRC staff has improved the methods of reducing regulatory uncertainties by (1) enhancing the technical basis preparation process for potential rulemakings and guidance and (2) designing a new guidance document, called a staff position, for clarifying regulatory uncertainties. For guiding the US DOE's reduction of technical uncertainties, the NRC staff will give more emphasis to prelicense application reviews and less emphasis on preparing staff technical positions

  16. Summary and recommendations of the NRC/INEL Activated Carbon Testing Program

    International Nuclear Information System (INIS)

    Scarpellino, C.D.; Sill, C.W.

    1986-01-01

    The Committee on Nuclear Air and Gas Treatment (CONAGT) of the American Society of Mechanical Engineers (ASME) sponsored an interlaboratory testing program, round-robin, of nuclear-grade activated carbon. The results of this round-robin revealed gross differences in penetration of radio-labeled methyl iodide as measured by the various laboratories when using Method A of the ASTM D-3803-79 Standard. These differences prompted the Nuclear Regulatory Commission (NRC) to establish the NRC/INEL Activated Carbon Testing Program to determine the causes of these discrepancies and to provide recommendations that could lead to an accurate and reliable testing procedure that would ensure an adequate method for assessing the capability of activated carbon to remove radioiodine from gas streams within commercial nuclear power plants. The NRC/INEL Activated Carbon Testing Program has conducted formal and informal interlaboratory comparisons to identify problems with the test method and its application and to assess the effectiveness of changes to procedures and equipment voluntarily implemented by commercial laboratories to mitigate the disparity of test results. The results of the first formal NRC/INEL Interlaboratory Comparison (IC) essentially verified the CONAGT round-robin results despite the use of a detailed test protocol. This data indicated that many of the participating laboratories probably had been operating outside the ASTM specifications for relative humidity (RH) and flow. In addition, this process provided information which was used to modify the testing protocol employed for the second NRC/INEL Interlaboratory Comparison (IC-2) to make it more rugged and reliable. These changes to the protocol together with the results of INEL sensitivity testing are the basis for the recommendations presented

  17. Estimated incremental costs for NRC licensees to implement the US/IAEA safeguards agreement

    International Nuclear Information System (INIS)

    Clark, R.G.; Brouns, R.J.; Chockie, A.D.; Davenport, L.C.; Merrill, J.A.

    1979-01-01

    A study was recently completed for the US Nuclear Regulatory Commision (NRC) by the Pacific Northwest Laboratory (PNL) to identify the incremental cost of implementing the US/IAEA safeguards treaty agreement to eligible NRC licensees. Sources for the study were cost estimates from several licensees who will be affected by the agreement and cost analyses by PNL staff. The initial cost to all eligible licensees to implement the agreement is estimated by PNL to range from $1.9 to $7.2 million. The annual cost to these same licensees for the required accounting and reporting activities is estimated at $0.5 to $1.5 million. Annual inspection costs to the industry for the limited IAEA inspection being assumed is estimated at $80,000 to $160,000

  18. NRC perspective on extended on-site storage of low-level radioactive waste after 1993

    International Nuclear Information System (INIS)

    Remick, Forrest J.

    1992-01-01

    The Low-Level Radioactive Waste Policy Amendments Act of 1985 (LLRWPAA) requires that each State, which has not provided for disposal capacity by January 1, 1993, must take title and possession of the low-level radioactive wastes generated in the State. If the states do not take title and possession of the wastes, the rebates to which the states would have been entitled to would be returned to the waste generators. in considering the matter, the Commission solicited comments from States) low-level radioactive waste compacts, local governments, and the general public so that the public's views could be factored into the Commission's deliberations on this issue. This paper addresses the current status of NRC positions on the adequacy of the NRC's existing regulatory framework associated with the title transfer provisions of the LLRWPAA and the Commission's views on extended on-site storage of low-level radioactive wastes after the 1993 and 1996 milestones. (author)

  19. NRC/FEMA operational response procedures for response to a commercial nuclear reactor accident

    International Nuclear Information System (INIS)

    1983-11-01

    Procedures have been developed by the US Nuclear Regulatory Commission (NRC) and the Federal Emergency Management Agency (FEMA) which provide the response teams of both agencies with the steps to be taken in responding to an emergency at a commercial nuclear power plant. The emphasis of these procedures is mainly on the interface between NRC and FEMA at their respective Headquarters and Regional Offices and at the various sites at which such an emergency could occur. Detailed procedures are presented that cover for both agencies, notification schemes and manner of activation, organizations at Headquaters and the site, interface procedures, coordination of onsite and offsite operations, the role of the Senior FEMA Official, and the cooperative efforts of each agency's public information staff

  20. NRC/FEMA operational response procedures for response to a commercial nuclear reactor accident. Revision 1

    International Nuclear Information System (INIS)

    1985-02-01

    Procedures have been developed by the US Nuclear Regulatory Commission (NRC) and the Federal Emergency Management Agency (FEMA) which provide the response teams of both agencies with the steps to be taken in responding to an emergency at a commercial nuclear power plant. The emphasis of these procedures is mainly on the interface between NRC and FEMA at their respective Headquarters and Regional Offices and at the various sites at which such an emergency could occur. Detailed procedures are presented that cover for both agencies, notification schemes and manner of activation, organizations at Headquarters and the site, interface procedures, coordination of onsite and offsite operations, the role of the Senior FEMA Official, and the cooperative efforts of each agency's public information staff

  1. New NRC methodology for estimating biological risks from exposure to ionizing radiation

    International Nuclear Information System (INIS)

    Willis, C.A; Branagan, E.F.

    1983-01-01

    In licensing commercial nuclear power reactors, in the US Nuclear Regulatory Commission considers the potential health effects from the release of radioactive effluents. This entails reliance on epidemiological study results and interpretations. The BEIR III report is a principal source of information but as newer information becomes available, it is desirable to include this in NRC models. To facilitate both the estimation of potential health effects and the evaluation of epidemiological study results, the NRC has supported the development of a new computer code (SPAHR). This new code utilizes much more comprehensive demographic models than did the previously used codes (CAIRD and BIERMOD). SPAHR can accommodate variations in all the principal demographic statistics such as age distribution, age-specific computing risks, and sex ratio. Also SPAHR can project effects over a number of generations

  2. NRC levies $62 100 fee for FY 1993 on all licensees

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    The Nuclear Regulatory Commission has issued its final rule on fee collections for fiscal year 1993, partly in response to a court decision that challenged the agency's FY 1991 fee schedule. Because the NRC must recover all of its annual budget - in excess of $500 million - through fees on licensees and users of agency services, those licensees and users are very sensitive about who shoulders how much of the burden. The new rule voids the previous NRC policy of exempting nonprofit educational institutions from the fee schedule, and the allocation of generic costs for low-level waste management to groups of licensees, rather than to individual licensees. The new rule went into effect on August 19

  3. NRC safety research in support of regulation

    International Nuclear Information System (INIS)

    1994-06-01

    This report, the ninth in a series of annual reports, was prepared in response to congressional inquiries concerning how nuclear regulatory research is used. It summarizes the accomplishments of the Office of Nuclear Regulatory Research during FY 1993. A special emphasis on accomplishments in nuclear power plant aging research reflects recognition that number of plants are entering the final portion of their original 40-year operating licenses and that, in addition to current aging effects, a focus on safety considerations for license renewal becomes timely. The primary purpose of performing regulatory research is to develop and provide the Commission and its staff with sound technical bases for regulatory decisions on the safe operation of licensed nuclear reactors and facilities, to find unknown or unexpected safety problems, and to develop data and related information for the purpose of revising the Commission's rules, regulatory guides, or other guidance

  4. 77 FR 26413 - Promoting International Regulatory Cooperation

    Science.gov (United States)

    2012-05-04

    ... as such in the Unified Agenda of Federal Regulatory and Deregulatory Actions, on RegInfo.gov , and on... engage in various forms of collaboration and communication with respect to regulations, in particular a...

  5. 1992 Nuclear Regulatory Commission Annual Report

    International Nuclear Information System (INIS)

    1993-01-01

    This is the 18th annual report of the US Nuclear Regulatory Commission (NRC), covering events and activities occurring in fiscal year 1992 (the year ending September 30, 1992), with some treatment of events from the last quarter of calendar year 1992. The NRC was created by enactment in the Congress of the Energy Reorganization Act of 1974. It is an independent agency of the Federal Government. The five NRC Commissioners are nominated by the President and confirmed by the United States Senate. The Chairman of the Commission is appointed by the President from among the Commissioners confirmed

  6. Directory of certificates of compliance for radioactive materials packages. Volume 1, Revision 17: Report of NRC approved packages

    International Nuclear Information System (INIS)

    1994-10-01

    This directory contains a Report of NRC Approved Packages (Volume 1), Certificates of Compliance (Volume 2), and a Report of NRC Approved Quality Assurance Programs for Radioactive Materials Packages (Volume 3). The purpose of this directory is to make available a convenient source of information on Quality Assurance Programs and Packagings which have been approved by the US Nuclear Regulatory Commission. Shipments of radioactive material utilizing these packagings must be in accordance with the provisions of 49 CFR section 173.471 and 10 CFR Part 71, as applicable. In satisfying the requirements of Section 71.12, it is the responsibility of the licensees to insure themselves that they have a copy of the current approval and conduct their transportation activities in accordance with an NRC approved quality assurance program

  7. Directory of Certificates of Compliance for Radioactive Materials Packages: Report of NRC Approved Quality Assurance Programs for Radioactive Materials Packages

    International Nuclear Information System (INIS)

    1993-10-01

    This directory contains a Report of NRC Approved Packages (Volume 1), Certificates of Compliance (Volume 2), and a Report of NRC Approved Quality Assurance Programs for Radioactive Materials Packages (Volume 3). The purpose of this directory is to make available a convenient source of information on Quality Assurance Programs and Packagings which have been approved by the US Nuclear Regulatory Commission. Shipments of radioactive material utilizing these packagings must be in accordance with the provisions of 49 CFR section 173.471 and 10 CFR Part 71, as applicable. In satisfying the requirements of Section 71.12, it is the responsibility of the licensees to insure themselves that they have a copy of the current approval and conduct their transportation activities in accordance with an NRC approved quality assurance program

  8. United States Nuclear Regulatory Commission information digest: 1997 edition. Volume 9

    International Nuclear Information System (INIS)

    1997-05-01

    The Nuclear Regulatory Commission Information Digest (digest) provides a summary of information about the US Nuclear Regulatory Commission (NRC), NRC's regulatory responsibilities, NRC licensed activities, and general information on domestic and world-wide nuclear energy. The digest, published annually, is a compilation of nuclear- and NRC-related data and is designed to provide a quick reference to major facts about the agency and the industry it regulates. In general, the data cover 1975 through 1996, with exceptions noted. Information on generating capacity and average capacity factor for operating US commercial nuclear power reactors is obtained from monthly operating reports that are submitted directly to the NRC by the licensee. This information is reviewed by the NRC for consistency only and no independent validation and/or verification is performed

  9. Examples of NRC research products used in regulation

    International Nuclear Information System (INIS)

    Anderson, N.R.

    1987-01-01

    The key to effective research is a close relationship between information needs and research results. This can only be achieved by close cooperation between the researchers and the regulators. At the NRC, this relationship has matured over the years until now the researchers participate in definition of the information needs and the regulators help define the research programs. The more formal means of ensuring a close match between needs and results include joint research groups, oversight working groups, and a system of Research Information Letters (RILs). On an informal basis there are many day to day discussions and meetings on the various programs which ensure effective program guidance and early identification of significant findings. This paper describes both the formal and informal researcher/regulation interface and discusses some examples of how specific research programs are utilized in the regulatory process. Specific programs described are the pressurized thermal shock program, the seismic margins program and the Category 1 structures program. Other examples cited are the aging and life extension programs

  10. Agenda 21 goes electronic.

    Science.gov (United States)

    Carter, D

    1996-01-01

    The Canada Center for Remote Sensing, in collaboration with the International Development Research Center, is developing an electronic atlas of Agenda 21, the Earth Summit action plan. This initiative promises to ease access for researchers and practitioners to implement the Agenda 21-action plan, which in its pilot study will focus on biological diversity. Known as the Biodiversity Volume of the Electronic Atlas of Agenda 21 (ELADA 21), this computer software technology will contain information and data on biodiversity, genetics, species, ecosystems, and ecosystem services. Specifically, it includes several country studies, documentation, as well as interactive scenarios linking biodiversity to socioeconomic issues. ELADA 21 will empower countries and agencies to report on and better manage biodiversity and related information. The atlas can be used to develop and test various scenarios and to exchange information within the South and with industrialized countries. At present, ELADA 21 has generated interest and becomes more available in the market. The challenge confronting the project team, however, is to find the atlas a permanent home, a country or agency willing to assume responsibility for maintaining, upgrading, and updating the software.

  11. Initial demonstration of the NRC`s capability to conduct a performance assessment for a High-Level Waste Repository

    Energy Technology Data Exchange (ETDEWEB)

    Codell, R.; Eisenberg, N.; Fehringer, D.; Ford, W.; Margulies, T.; McCartin, T.; Park, J.; Randall, J.

    1992-05-01

    In order to better review licensing submittals for a High-Level Waste Repository, the US Nuclear Regulatory Commission staff has expanded and improved its capability to conduct performance assessments. This report documents an initial demonstration of this capability. The demonstration made use of the limited data from Yucca Mountain, Nevada to investigate a small set of scenario classes. Models of release and transport of radionuclides from a repository via the groundwater and direct release pathways provided preliminary estimates of releases to the accessible environment for a 10,000 year simulation time. Latin hypercube sampling of input parameters was used to express results as distributions and to investigate model sensitivities. This methodology demonstration should not be interpreted as an estimate of performance of the proposed repository at Yucca Mountain, Nevada. By expanding and developing the NRC staff capability to conduct such analyses, NRC would be better able to conduct an independent technical review of the US Department of Energy (DOE) licensing submittals for a high-level waste (HLW) repository. These activities were divided initially into Phase 1 and Phase 2 activities. Additional phases may follow as part of a program of iterative performance assessment at the NRC. The NRC staff conducted Phase 1 activities primarily in CY 1989 with minimal participation from NRC contractors. The Phase 2 activities were to involve NRC contractors actively and to provide for the transfer of technology. The Phase 2 activities are scheduled to start in CY 1990, to allow Sandia National Laboratories to complete development and transfer of computer codes and the Center for Nuclear Waste Regulatory Analyses (CNWRA) to be in a position to assist in the acquisition of the codes.

  12. NRC systematic evaluation program: seismic review

    International Nuclear Information System (INIS)

    Levin, H.A.

    1980-01-01

    The NRC Systematic Evaluation Program is currently making an assessment of the seismic design safety of 11 older nuclear power plant facilities. The general review philosophy and review criteria relative to seismic input, structural response, and equipment functionability are presented, including the rationale for the development of these guidelines considering the significant evolution of seismic design criteria since these plants were originally licensed. Technical approaches thought more realistic in light of current knowledge are utilized. Initial findings for plants designed to early seismic design procedures suggest that with minor exceptions, these plants possess adequate seismic design margins when evaluated against the intent of current criteria. However, seismic qualification of electrical equipment has been identified as a subject which requires more in-depth evaluation

  13. Design basis for the NRC Operations Center

    Energy Technology Data Exchange (ETDEWEB)

    Lindell, M.K.; Wise, J.A.; Griffin, B.N.; Desrosiers, A.E.; Meitzler, W.D.

    1983-05-01

    This report documents the development of a design for a new NRC Operations Center (NRCOC). The project was conducted in two phases: organizational analysis and facility design. In order to control the amount of traffic, congestion and noise within the facility, it is recommended that information flow in the new NRCOC be accomplished by means of an electronic Status Information Management System. Functional requirements and a conceptual design for this system are described. An idealized architectural design and a detailed design program are presented that provide the appropriate amount of space for operations, equipment and circulation within team areas. The overall layout provides controlled access to the facility and, through the use of a zoning concept, provides each team within the NRCOC the appropriate balance of ready access and privacy determined from the organizational analyses conducted during the initial phase of the project.

  14. Design basis for the NRC Operations Center

    International Nuclear Information System (INIS)

    Lindell, M.K.; Wise, J.A.; Griffin, B.N.; Desrosiers, A.E.; Meitzler, W.D.

    1983-05-01

    This report documents the development of a design for a new NRC Operations Center (NRCOC). The project was conducted in two phases: organizational analysis and facility design. In order to control the amount of traffic, congestion and noise within the facility, it is recommended that information flow in the new NRCOC be accomplished by means of an electronic Status Information Management System. Functional requirements and a conceptual design for this system are described. An idealized architectural design and a detailed design program are presented that provide the appropriate amount of space for operations, equipment and circulation within team areas. The overall layout provides controlled access to the facility and, through the use of a zoning concept, provides each team within the NRCOC the appropriate balance of ready access and privacy determined from the organizational analyses conducted during the initial phase of the project

  15. U.S. Nuclear Regulatory Commission natural analogue research program

    International Nuclear Information System (INIS)

    Kovach, L.A.; Ott, W.R.

    1995-01-01

    This article describes the natural analogue research program of the U.S. Nuclear Regulatory Commission (US NRC). It contains information on the regulatory context and organizational structure of the high-level radioactive waste research program plan. It also includes information on the conditions and processes constraining selection of natural analogues, describes initiatives of the US NRC, and describes the role of analogues in the licensing process

  16. Licensing considerations in converting NRC-licensed non-power reactors from high-enriched to low-enriched uranium fuels

    International Nuclear Information System (INIS)

    Carter, R.E.

    1985-01-01

    During the mid-1970s, there was increasing concern with the possibility that highly enriched uranium (HEU), widely used in non-power reactors around the world, might be diverted from its intended peaceful uses. In 1982 the U.S. Nuclear Regulatory Commission (NRC) issued a policy statement that was intended to conform with the perceived international thinking, and that addressed the two relevant areas in which NRC has statutory responsibility, namely, export of special nuclear materials for non-USA non-power reactors, and the licensing of USA-based non-power reactors not owned by the Federal government. To further address the second area, NRC issued a proposed rule for public comment that would require all NRC-licensed non-power reactors using HEU to convert to low enriched uranium (LEU) fuel, unless they could demonstrate a unique purpose. Currently the NRC staff is revising the proposed rule. An underlying principle guiding the staff is that as long as a change in enrichment does not lead to safety-related reactor modifications, and does not involve an unreviewed safety question, the licensee could convert the core without prior NRC approval. At the time of writing this paper, a regulatory method of achieving this principle has not been finalized. (author)

  17. Licensing considerations in converting NRC-licensed non-power reactors from high-enriched to low-enriched uranium fuels

    Energy Technology Data Exchange (ETDEWEB)

    Carter, R E

    1985-07-01

    During the mid-1970s, there was increasing concern with the possibility that highly enriched uranium (HEU), widely used in non-power reactors around the world, might be diverted from its intended peaceful uses. In 1982 the U.S. Nuclear Regulatory Commission (NRC) issued a policy statement that was intended to conform with the perceived international thinking, and that addressed the two relevant areas in which NRC has statutory responsibility, namely, export of special nuclear materials for non-USA non-power reactors, and the licensing of USA-based non-power reactors not owned by the Federal government. To further address the second area, NRC issued a proposed rule for public comment that would require all NRC-licensed non-power reactors using HEU to convert to low enriched uranium (LEU) fuel, unless they could demonstrate a unique purpose. Currently the NRC staff is revising the proposed rule. An underlying principle guiding the staff is that as long as a change in enrichment does not lead to safety-related reactor modifications, and does not involve an unreviewed safety question, the licensee could convert the core without prior NRC approval. At the time of writing this paper, a regulatory method of achieving this principle has not been finalized. (author)

  18. Agenda 21: is there a transport agenda

    Energy Technology Data Exchange (ETDEWEB)

    Parisien, N.

    1996-12-31

    On June 13, 1992, late evening, though negotiations were being closed in Rio de Janeiro, at the United Nations Conference on Environment and Development (Earth Summit). Agenda 21`s Chapter 9 (Protection of the atmosphere) and the Climate Convention -- addressing greenhouse gas emissions - also called CO{sub 2} -- have been adopted. Therefore, a consensus was reached over the importance of controlling, for which the transport sector is a major contributor, causing -- among others -- health hazards and the depletion of fossil-fuel on-renewable resources. But transport systems are essential as part of social and economic life. Over the past 30 years, superpowers and rich countries emitted most CO{sub 2} emissions -- more than 80 %. But beyond 2020, developing countries are most likely to consume more than half of the energy to a 1992 U. S. Congress Report). Furthermore, prices vary on only significantly within OECD countries, but also within developing countries. Beyond this primary challenge, the matter of technology transfers is another one. More advanced technologies are under control of only a few countries. Systems integration, electrification, intelligent vehicle highway systems, etc. do account as emerging technologies available for the turn of the century. So we must define a transport planning horizon, which addresses priorities for the short term: raising prices for non-renewable resources within OECD countries, according to international co-operation an co-ordination. Then, we must anticipate a technology-transfer program while raising prices in developing countries with the implementation of up to date technology. Increasing transport supply is not the only answer to sustainable transport. Transport demand management can also deliver services in more efficient ways... (author) 4 refs.

  19. NRC licensing speedup. Hearing before a Subcommittee of the Committee on Government Operations, House of Representatives, Ninety-Seventh Congress, First Session, June 18, 1981

    International Nuclear Information System (INIS)

    Anon.

    1982-01-01

    Joseph Hendrie, Acting Chairman of the Nuclear Regulatory Commission (NRC), was the principal witness at a June 18, 1981 hearing on whether the NRC is responsible for idling and delaying nuclear plants at a high cost to consumers. Congress is considering an interim licensing procedure that will allow plants to operate before safety hearings are completed. NRC evidence suggests that most plant delays are only projected ones, and that utilities must bear the blame for slippage in most construction schedules. Mr. Hendrie discussed the status of the nine impacted plants on the NRC list and outlined steps the Commission is taking to improve efficiency without impairing safety. His testimony and letters, statements, and other materials submitted for the record make up the hearing report

  20. Nuclear regulatory legislation, 104th Congress, Volume 1, No. 4

    International Nuclear Information System (INIS)

    1997-12-01

    This document is the first of two volumes compiling statutes and material pertaining to nuclear regulatory legislation through the 104th Congress, 2nd Session. It is intended for use as a U.S. Nuclear Regulatory Commission (NRC) internal resource document. Legislative information reproduced in this document includes portions of the Atomic Energy Act, Energy Reorganization Act, Low-Level Radioactive Waste Policy Amendments Act, and Nuclear Waste Policy Act. Other information included in this volume pertains to NRC user fees, NRC authorizations, the Inspector General Act, and the Administrative Procedure Act

  1. US Nuclear Regulatory Commission, 1984 annual report. Volume 1

    International Nuclear Information System (INIS)

    1985-01-01

    This is the 10th annual report of the US Nuclear Regulatory Commission (NRC). This report covers the major activities, events, decisions and planning that took place during fiscal year 1984 (October 1983 through September 1984) within the NRC or involving the NRC. Information is presented concerning 1984 highlights and planning for 1985; reactor regulation; cleanup at Three Mile Island Unit 2; operational experience; nuclear materials; safeguards; waste management; inspection, enforcement, quality assurance, and emergency preparedness; cooperation with the States; international programs; nuclear regulatory research; proceedings and litigation; and management and communication

  2. Nuclear regulatory legislation, 104th Congress, Volume 1, No. 4

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-01

    This document is the first of two volumes compiling statutes and material pertaining to nuclear regulatory legislation through the 104th Congress, 2nd Session. It is intended for use as a U.S. Nuclear Regulatory Commission (NRC) internal resource document. Legislative information reproduced in this document includes portions of the Atomic Energy Act, Energy Reorganization Act, Low-Level Radioactive Waste Policy Amendments Act, and Nuclear Waste Policy Act. Other information included in this volume pertains to NRC user fees, NRC authorizations, the Inspector General Act, and the Administrative Procedure Act.

  3. Regulatory and technical reports (abstract index journal). Compilation for third quarter 1984, July-September. Volume 9, No. 3

    International Nuclear Information System (INIS)

    1984-11-01

    This compilation consists of bibliographic data and abstracts for the formal regulatory and technical reports issued by the US Nuclear Regulatory Commission (NRC) Staff and its contractors. The main citations and abstracts in this compilation are listed in NUREG number order: NUREG-XXXX, NUREG/CP-XXXX, and NUREG/CR-XXXX. These precede the following indexes: Contractor Report Number, Personal Author, Subject, NRC Originating Organization (Staff Reports), NRC Contract Sponsor (Contractor Reports), Contractor, and Licensed Facility

  4. Regulatory and technical reports, compilation for 1979. Volume 4. Bibliographical report Jan-Dec 79

    International Nuclear Information System (INIS)

    Oliu, W.E.; McKenzie, L.; Aragon, R.

    1980-07-01

    The compilation lists formal regulatory and technical reports issued in 1979 by the U.S. Nuclear Regulatory Commission (NRC) staff and by NRC contractors. The compilation is divided into three major sections. The first major section consists of a sequential listing of all NRC reports in report-number order. The first portion of this sequential section lists staff reports, the second portion lists NRC-sponsored conference proceedings, and the third lists contractor reports. Each report citation in the sequential section contains full bibliographic information

  5. Regulatory and technical reports: compilation for third quarter 1982 July-September

    International Nuclear Information System (INIS)

    1982-11-01

    This compilation consists of bibliographic data and abstracts for the formal regulatory and technical reports issued by the US Nuclear Regulatory Commission (NRC) Staff and its contractors. It is NRC's intention to publish this compilation quarterly and to cumulate it annually. The main citations and abstracts in this compilation are listed in NUREG number order: NUREG-XXXX, NUREG/CP-XXXX, and NUREG/CR-XXXX. This precede the following indexes: Contractor Report Number Index; Personal Author Index; Subject Index; NRC Originating Organization Index (Staff Reports); NRC Contract Sponsor Index (Contractor Reports); Contractor Index; and Licensed Facility Index

  6. Structure and drafting of safeguards regulatory documents

    International Nuclear Information System (INIS)

    Cole, R.J.; Bennett, C.A.; Edelhertz, H.; Wood, M.T.; Brown, R.J.; Roberts, F.P.

    1977-09-01

    This study develops hypothesis about the relation between the structure and drafting of safeguards regulatory documents and the ability of document users to understand and implement them in a way that reflects the intent and requirements of the NRC. Four decisions are needed to improve communication: (1) Should improvement of safeguards regulatory documents as communication instruments be an explicit NRC program. (2) What specific methods of communication should be the focus of improvement efforts. (3) What actions to improve communications are feasible and desirable. (4) How should the NRC divide its available effort and resources among desirable actions in order to provide the most effective communication through regulatory documents. This volume contains: introduction, conceptual bases, legal requirements, targets, choice of documents, preparation of documents, readability, and further study of recommended changes in structure and drafting

  7. FORECAST: Regulatory effects cost analysis software annual

    International Nuclear Information System (INIS)

    Lopez, B.; Sciacca, F.W.

    1991-11-01

    Over the past several years the NRC has developed a generic cost methodology for the quantification of cost/economic impacts associated with a wide range of new or revised regulatory requirements. This methodology has been developed to aid the NRC in preparing Regulatory Impact Analyses (RIAs). These generic costing methods can be useful in quantifying impacts both to industry and to the NRC. The FORECAST program was developed to facilitate the use of the generic costing methodology. This PC program integrates the major cost considerations that may be required because of a regulatory change. FORECAST automates much of the calculations typically needed in an RIA and thus reduces the time and labor required to perform these analysis. More importantly, its integrated and consistent treatment of the different cost elements should help assure comprehensiveness, uniformity, and accuracy in the preparation of needed cost estimates

  8. Regulatory and technical reports (Abstract Index Journal). Compilation for third quarter 1985, July-September. Volume 10, No. 3

    International Nuclear Information System (INIS)

    1985-10-01

    This compilation consists of bibliographic data and abstracts for the formal Regulatory and technical reports issued by the US Nuclear Regulatory Commission (NRC) Staff and its contractors. This compilation covers the period from July through September, 1985

  9. Armenian nuclear power plant: US NRC assistance programme for seismic upgrade and safety analysis

    International Nuclear Information System (INIS)

    Simos, N.; Perkins, K.; Jo, J.; Carew, J.; Ramsey, J.

    2003-01-01

    This paper summarizes the U.S. Nuclear Regulatory Commission's (US NRC) technical support program activities associated with the Armenian Nuclear Power Plant (ANPP) safety upgrade. The US NRC program, integrated within the overall IAEA-led initiative for safety re-evaluation of the WWER plants, has as its main thrust the technical support to the Armenian Nuclear Regulatory Authority (ANRA) through close collaboration with the scientific staff at Brookhaven National Laboratory (BNL). Several major technical areas of support to ANRA form the basis of the NRC program. These include the seismic re-evaluation and upgrade of the ANPP, safety evaluation of critical systems, and the generation of the Safety Analysis Report (SAR). Specifically, the seismic re-evaluation of the ANPP is part of a broader activity that involves the re-assessment of the seismic hazard at the site, the identification of the Safe Shutdown Equipment at the plant and the evaluation of their seismic capacity, the detailed modeling and analysis of the critical facilities at ANPP, and the generation of the Floor Response Spectra (FRS). Based on the new spectra that incorporate all new findings (hazard, site soil, structure, etc.), the overall capacity of the main structures and the seismic capacity of the critical systems are being re-evaluated. In addition, analyses of critical safe shutdown systems and safe shutdown processes are being performed to ensure both the capabilities of the operating systems and the enhancement of safety due to system upgrades. At present, one of the principal goals of the US NRC's regulatory assistance activities with ANRA is enhancing ANRA's regulatory oversight of high-priority safety issues (both generic and plant-specific) associated with operation of the ANPP. As such, assisting ANRA in understanding and assessing plant-specific seismic and other safety issues associated with the ANPP is a high priority given the ANPP's being located in a seismically active area

  10. Directory of certificates of compliance for radioactive materials packages. Summary report of NRC approved packages

    International Nuclear Information System (INIS)

    1979-10-01

    This directory contains a Summary Report of NRC Approved Packages for radioactive material packages effective September 14, 1979. Purpose of this directory is to make available a convenient source of information on packagings which have been approved by the US Nuclear Regulatory Commission. To assist in identifying packaging, an index by Model Number and corresponding Certificate of Compliance number is included at the back of each volume of the directory. The Summary Report includes a listing of all users of each package design prior to the publication date of the directory

  11. The NRC activities concerning Boraflex use in spent-fuel storage racks

    International Nuclear Information System (INIS)

    Kopp, L.I.

    1996-01-01

    The U.S. Nuclear Regulatory Commission (NRC) has issued several generic communications to the nuclear industry identifying two issues with respect to using Boraflex in spent-fuel storage racks. The first issue related to gamma-radiation-induced shrinkage of Boraflex and the potential to develop tears or gaps in the material. This phenomenon is typically accounted for in criticality analyses of spent-fuel storage racks. The second issue concerned long-term Boraflex performance throughout the intended service life of the racks as a result of both gamma irradiation and exposure to the wet pool environment

  12. Directory of certificates of compliance for radioactive materials packages. Summary report of NRC approved packages

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-10-01

    This directory contains a Summary Report of NRC Approved Packages for radioactive material packages effective September 14, 1979. Purpose of this directory is to make available a convenient source of information on packagings which have been approved by the US Nuclear Regulatory Commission. To assist in identifying packaging, an index by Model Number and corresponding Certificate of Compliance number is included at the back of each volume of the directory. The Summary Report includes a listing of all users of each package design prior to the publication date of the directory.

  13. Regulatory and technical reports (abstract index journal). Volume 20, No. 2: Compilation for second quarter April--June 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    This compilation consists of bibliographic data and abstracts for the formal regulatory and technical reports issued by the U.S. Nuclear Regulatory Commission (NRC) Staff and its contractors. It is NRC`s intention to publish this compilation quarterly and to cumulate it annually.

  14. Regulatory and technical reports (Abstract Index Journal). Compilation for first quarter 1986, January-March. Volume 11, No. 1

    International Nuclear Information System (INIS)

    1986-04-01

    This compilation consists of bibliographic data and abstracts for the formal regulatory and technical reports issued by the US Nuclear Regulatory Commission staff and its contractors, as well as conference proceedings. Entries are indexed by contractor report number, personal author, subject, NRC originating organization, NRC contract sponsor, contractor, and licensed facility

  15. Regulatory and technical reports (abstract index journal). Volume 20, No. 2: Compilation for second quarter April--June 1995

    International Nuclear Information System (INIS)

    1995-09-01

    This compilation consists of bibliographic data and abstracts for the formal regulatory and technical reports issued by the U.S. Nuclear Regulatory Commission (NRC) Staff and its contractors. It is NRC's intention to publish this compilation quarterly and to cumulate it annually

  16. 77 FR 36017 - Regulatory Guide 7.3, Procedures for Picking Up and Receiving Packages of Radioactive Material

    Science.gov (United States)

    2012-06-15

    ... NUCLEAR REGULATORY COMMISSION [NRC-2012-0139] Regulatory Guide 7.3, Procedures for Picking Up and... Guide (RG) 7.3, ``Procedures for Picking Up and Receiving Packages of Radioactive Material.'' The guide..., please contact the NRC's Public Document Room (PDR) reference staff at 1-800-397-4209, or 301-415-4737...

  17. Development of RESRAD probabilistic computer codes for NRC decommissioning and license termination applications

    International Nuclear Information System (INIS)

    Chen, S. Y.; Yu, C.; Mo, T.; Trottier, C.

    2000-01-01

    In 1999, the US Nuclear Regulatory Commission (NRC) tasked Argonne National Laboratory to modify the existing RESRAD and RESRAD-BUILD codes to perform probabilistic, site-specific dose analysis for use with the NRC's Standard Review Plan for demonstrating compliance with the license termination rule. The RESRAD codes have been developed by Argonne to support the US Department of Energy's (DOEs) cleanup efforts. Through more than a decade of application, the codes already have established a large user base in the nation and a rigorous QA support. The primary objectives of the NRC task are to: (1) extend the codes' capabilities to include probabilistic analysis, and (2) develop parameter distribution functions and perform probabilistic analysis with the codes. The new codes also contain user-friendly features specially designed with graphic-user interface. In October 2000, the revised RESRAD (version 6.0) and RESRAD-BUILD (version 3.0), together with the user's guide and relevant parameter information, have been developed and are made available to the general public via the Internet for use

  18. NRC staff review of licensee responses to pressure-locking and thermal-binding issue

    Energy Technology Data Exchange (ETDEWEB)

    Rathbun, H.J.

    1996-12-01

    Commercial nuclear power plant operating experience has indicated that pressure locking and thermal binding represent potential common mode failure mechanisms that can cause safety-related power-operated gate valves to fail in the closed position, thus rendering redundant safety-related systems incapable of performing their safety functions. In Generic Letter (GL) 95-07, {open_quotes}Pressure Locking and Thermal Binding of Safety-Related Power-Operated Gate Valves,{close_quotes} the U.S. Nuclear Regulatory Commission (NRC) staff requested that nuclear power plant licensees take certain actions to ensure that valves susceptible to pressure locking or thermal binding are capable of performing their safety functions within the current licensing bases of the facility. The NRC staff has received summary information from licensees in response to GL 95-07 describing actions they have taken to prevent the occurrence of pressure locking and thermal binding. The NRC staff has developed a systematic process to help ensure uniform and consistent review of licensee submittals in response to GL 95-07.

  19. Consolidation and Decomposition of APR1400 NRC Design Certification Processes for Collaborative and Accelerated Processing

    Energy Technology Data Exchange (ETDEWEB)

    Cho, Young Chul [FNC Technology Co., Yongin (Korea, Republic of); Kang, Deog Ji [KNHP, Daejeon (Korea, Republic of)

    2016-05-15

    KEPCO and KHNP are conducting APR1400 Design Certification from NRC. For the proper management of processes and information, a system called RIS (Regulatory Information management System) has been implemented by FNC from 2014, and it is on the final stage. In retaining the certification from NRC, RIS will be a very essential role by providing platform for collaborative and accelerated processing of responses to RAI (Request of Additional Information). Preparation of responses to RAI with this kind of systematic approach may be the first in the world. Westinghouse is doing manually and using MS Excel to collect the processing status. Where as, RIS will enable each member can do his own job and collect the status automatically. In this paper, how collaborative and accelerated processing of responses to RAI can be enabled will be described, and further enhancements will also be discussed. It handles MS Word directory with the help of VSTO. And with the help of Aspose.Total for .NET, the prepared response to RAI meets NRC's requirements. Through some further work and direct integration with requirement management solution, RIS can be expanded to cover a prior impact notice in case of DCD being altered.

  20. High-level-waste records management system: the NRC pilot project

    International Nuclear Information System (INIS)

    Bender, A.; Altomare, P.

    1987-01-01

    The US Nuclear Regulatory Commission (NRC) and the US Dept. of Energy (DOE) have agreed to develop a licensing support system (LSS) to address the records management requirements created by the Nuclear Waste Policy Act (NWPA). The NRC is planning to conduct a negotiated rule making the modify 10CFR2, including rules governing discovery, so that parties to the licensing process will use a single information management system as a source for all licensing-related documents. The successful demonstration of the pilot project has resulted in an operational on-line record management system for NRC-related HLW documents. Both incoming and outgoing documents are being scanned and stored on a mainframe system and on an optical disk. At this writing the optical disk portion of the system is being tested to evaluate its potential use as a future archival and distribution medium for licensing records. Experience gained from this project is being shared with other government agencies that are in the process of using similar technologies to come to grips with the complex records management problem endemic to our information-based society