WorldWideScience

Sample records for npp mochovce riadenie

  1. The seismic reassessment Mochovce NPP

    International Nuclear Information System (INIS)

    Baumeister, P.

    2004-01-01

    The design of Mochovce NPP was based on the Novo-Voronez type WWER-440/213 reactor - twin units. Seismic characteristic of this region is characterized by very low activity. Mochovce NPP site is located on the rock soil with volcanic layer (andesit). Seismic reassessment of Mochovce NPP was done in two steps: deterministic approach up to commissioning confirmed value Horizontal Peak Ground Acceleration HPGA=0.1 g and activities after commissioning as a consequence of the IAEA mission indicate higher hazard values. (author)

  2. Mochovce NPP simulator

    International Nuclear Information System (INIS)

    Ziakova, M.

    1998-01-01

    Mochovce NPP simulator basic features and detailed description of its characteristics are presented with its performance, certification and application for training of NPP operators as well as the training scenario

  3. Safety culture at Mochovce NPP

    International Nuclear Information System (INIS)

    Markus, Jozef; Feik, Karol

    2002-01-01

    This article presents the approach of Mochovce NPP to the Safety culture. It presents activities, which have been taken by Mochovce NPP up to date in the area of Safety culture enhancement with the aim of getting the term into the subconscious of each employee, and thus minimising the human factor impact on occurrence of operational events in all safety areas. The article furthermore presents the most essential information on how the elements characterising a continuous progress in reaching the planned Safety culture goals of the company management have been implemented at Mochovce NPP, as well as the management's efforts to get among the best nuclear power plant operators in this area and to be an example for the others. (author)

  4. Safety upgrading program in NPP Mochovce

    International Nuclear Information System (INIS)

    Baumeister, P.

    1999-01-01

    EMO interest is to operate only nuclear power plants with high standards of nuclear safety. This aim EMO declare on preparation completion and commissioning of Mochovce Nuclear Power Plant. Wide co-operation of our company with International Atomic Energy Agency and west European Inst.ions and companies has been started with aim to fulfil the nuclear safety requirements for Mochovce NPP. Set of 87 safety measures was implemented at Mochovce Unit 1 and is under construction at Unit 2. Mochovce NPP approach to safety upgrading implementation is showed on chosen measures. This presentation is focused on the issues category III.(author)

  5. Actual status of project Mochovce NPP units 3 and 4 completion

    International Nuclear Information System (INIS)

    Niznan, S.

    2005-01-01

    In this presentation author deals with actual status of project Mochovce NPP units 3 and 4 completion. Present state of Mochovce NPP, Units 3 and 4 enables real assumption to completion. It is expected that such supplier companies can be used which are experienced in field of nuclear projects. Based on budget of 2002, it seems that completion costs of 45 billions SKK are real. These figures were confirmed by study performed by TRACTEBEL in 2004. Based on experience from Bohunice NPP completion as well as from Mochovce NPP, Units 1 and 2 completion and if decision milestone and project start up deadlines will be observed according to modified preliminary schedule of Mochovce NPP Units 3 and 4 completion, it seems as real that Unit 3 will be completed till 06/2011 and Unit 4 - till 12/2011.

  6. Regulatory requirements for demonstration of the achieved safety level at the Mochovce NPP before commissioning

    International Nuclear Information System (INIS)

    Lipar, M.

    1997-01-01

    A review of regulatory requirements for demonstration of the achieved safety level at the Mochovce NPP before commissioning is given. It contains licensing steps in Slovakia during commissioning; Status and methodology of Mochovce safety analysis report; Mochovce NPP safety enhancement program; Regulatory body policy towards Mochovce NPP safety enhancement; Recent development in Mochovce pre-operational safety enhancement program review and assessment process; Licensing steps in Slovakia during commissioning

  7. Polish media and public opinion on NPP Mochovce commissioning

    International Nuclear Information System (INIS)

    Latek, Stanislaw

    1999-01-01

    The so called 'Mochovce Problem' was one of the major topics in Polish media in the period from May to July 1998. The nuclear power plant commissioning caused an unexpectedly strong reaction, especially in the newspapers, slightly less so in electronic media. Faced with clearly hostile media reaction to Mochovce NPP, the National Atomic Energy Agency representatives, together with atomic and nuclear experts, undertook to change these attitudes. In numerous interviews, letters to the editors and talks with journalists, they attempted to correct the mistakes, explain the true safety situation in the nuclear power plant, by whom it was constructed, who supervised and tested the systems and so on. The completion of Mochovce NPP construction improved significantly the electricity balance in Slovakia, thus decreasing the pressure for continuing the operation of older Bohunice V1 units beyond their design lifetime. For this reason, as well as in view of striving for improvement in environmental factors beyond Polish southern border, especially after Kyoto/97 decisions on greenhouse gases emissions, the public opinion in Poland should support the Mochovce NPP construction. In 1996 Poland has signed with Slovakia a bilateral inter-governmental agreement on the prompt notification on nuclear accidents and on the cooperation in the nuclear safety and radiological protection matters. On the basis of this agreement the experts from Polish National Atomic Energy Agency are in perpetual contact with Slovakian Nuclear Regulatory Body and in each and every moment can obtain full and comprehensive information on the plant parameters iportant for nuclear safety. The experts explanations, together with the NAEA top management visit to the plant itself, brought some results. The media became less aggressive, and Polish public and authorities - contrary to the Austrians - do not protest loudly against the commissioning of this newest European NPP. Now, in December 1998, the tune of

  8. Review of accident analyses performed at Mochovce NPP

    International Nuclear Information System (INIS)

    Siko, D.

    2000-01-01

    In this paper the review of accident analysis performed in NPP Mochovce V-1 is presented. The scope of these safety measures was defined and development in the T SSM for NPP Mochovce Nuclear Safety Improvements Report' issued in July 1995. The main objectives of these safety measures were the followings: (a) to establish the criteria for selection and classification of accidental events, as well as defining the list of initiating events to be analysed. Accident classification to the individual groups must be performed in accordance with RG 1.70 and IAEA recommendations 'Guidelines for Accidental Analysis of WWER NPP' (IAEA-EBR-WWER-01) to select boundary cases to be calculated from the scope of initiating events; (b ) to elaborate the accident analysis methodology that also includes acceptance criteria for their result evaluation, initial and boundary conditions, assumption related with the application of the single failure criteria, requirements on the analysis quality, used computer codes, as well as NPP models and input data for the accident analysis; (c) to perform the accident analysis for the Pre-operational Safety Report (POSAR); (d) to provide a synthetic report addressing the validity range of codes models and correlations, the assessment against relevant tests results, the evidence of the user qualification, the modernisation and nodding scheme for the plant and the justification of used computer codes. Analyses results showed that all acceptance criteria were met with satisfactory margin and design of the NPP Mochovce is accurate. (author)

  9. Safety improvement and results of commissioning of Mochovce NPP WWER 440/213

    International Nuclear Information System (INIS)

    Lipar, M.

    1998-01-01

    Mochovce NPP is the last one of this kind and compared to its predecessors, it is characterized by several modifications which contribute to the improvement of the safety level. In addition based on Nuclear Regulatory Authority requirements and based on documents: - IAEA - Safety Issues and their ranking for NPP WWER 440/213, - IAEA - Safety Improvement of Mochovce NPP Project Review Mission, - Riskaudit - Evaluation of the Mochovce NPP Safety Improvements. Additional safety measures have been implemented before commissioning. The consortium EUCOM (FRAMATOME - SIEMENS), SKODA Praha, ENERGOPROJEKT Praha, Russian organizations and VUJE Trnava Nuclear Power Plants research institute were selected for design and implementation of the safety measures. The papers summarized, safety requirements, safety measures implemented, results of commissioning and results of safety analysis report evaluation. (author)

  10. NPP Mochovce units 1 and 2 diagnostic systems

    International Nuclear Information System (INIS)

    Heidenreich, S.

    1997-01-01

    In this paper the diagnostic systems (leak detection monitoring, vibration monitoring, lose parts monitoring, fatigue monitoring) of NPP Mochovce units 1 and 2 are presented. All of the designed diagnostic systems are personal computer based systems

  11. ESTE EMO and ESTE EBO - emergency response system for NPP Mochovce and NPP Bohunice V-2

    International Nuclear Information System (INIS)

    Caeny, P.; Chyly, M.; Suchon, D.; Smejkalova, E.; Fabova, V.; Mancikova, M.; Muller, P.

    2009-01-01

    Programs ESTE EMO and ESTE EBO are emergency response systems that help the crisis staff of the NPP in assessing the source term (predicted possible release of radionuclides to the atmosphere ), in assessing the urgent protective measures and sectors under threat, in assessing real release (symptoms of release really detected and observed), in calculating radiological impacts of real release, averted or avertable doses, potential doses and doses during transport or evacuation on specified routes. Both systems serve as instruments in case of severe accident (DBA or BDBA) at NPP Mochovce or NPP Bohunice, accidents with threat of release of radioactivity to the atmosphere. Systems are implemented at emergency centre of Mochovce NPP and Bohunice NPP and connected online to the sources of technological and radiological data from the reactor, primary circuit, confinement, secondary circuit, ventilation stack, from the area of NPP (TDS 1) and from the emergency planning zone (TDS 11). Systems are connected online to the sources of meteorological data, too. (authors)

  12. ESTE EMO and ESTE EBO - emergency response system for NPP Mochovce and NPP Bohunice V-2

    International Nuclear Information System (INIS)

    Caeny, P.; Chyly, M.; Suchon, D.; Smejkalova, E.; Fabova, V.; Mancikova, M.; Muller, P.

    2008-01-01

    Programs ESTE EMO and ESTE EBO are emergency response systems that help the crisis staff of the NPP in assessing the source term (predicted possible release of radionuclides to the atmosphere ), in assessing the urgent protective measures and sectors under threat, in assessing real release (symptoms of release really detected and observed), in calculating radiological impacts of real release, averted or avertable doses, potential doses and doses during transport or evacuation on specified routes. Both systems serve as instruments in case of severe accident (DBA or BDBA) at NPP Mochovce or NPP Bohunice, accidents with threat of release of radioactivity to the atmosphere. Systems are implemented at emergency centre of Mochovce NPP and Bohunice NPP and connected online to the sources of technological and radiological data from the reactor, primary circuit, confinement, secondary circuit, ventilation stack, from the area of NPP (TDS 1) and from the emergency planning zone (TDS 11). Systems are connected online to the sources of meteorological data, too. (authors)

  13. Slovakia: Mochovce NPP. Project control. Annex 10

    International Nuclear Information System (INIS)

    Bodorik, K.

    1999-01-01

    This annex deals with project control. Mochovce NPP suffered considerable delay primarily due to lack of money. This situation was corrected and construction resumed in 1996. Throughout the 'dormant' period the plant received considerable support from the major contractors, who maintained skeleton staff at site. Significant safety and managerial improvements are being introduced and a strategic plan for the plant has been developed. (author)

  14. Level 1 shutdown and low power operation of Mochovce NPP, Unit 1, Slovakia

    International Nuclear Information System (INIS)

    Halada, P.; Cillik, I.; Stojka, T.; Kuzma, M.; Prochaska, J.; Vrtik, L.

    2004-01-01

    The paper presents general approach, used methods and form of documentation of the results that have been applied within the shutdown and low power PSA (SPSA) study for Mochovce NPP, Unit 1, Slovakia. The SPSA project was realized by VUJE Trnava Inc., Slovakia in 2001-2002 years. The Level 1 SPSA study for Mochovce NPP Unit 1 covers internal events as well as internal (fires, floods and heavy load drop) and external (aircraft crash, extreme meteorological conditions, seismic event and influence of surrounding industry) hazards. Mochovce NPP consists of two operating units equipped with VVER 440/V213 reactors safety upgraded before construction finishing and operation start. 87 safety measures based on VVER 440 operational experience and international mission insights were implemented to enhance its operational and nuclear safety. The SPSA relates to full power PSA (FPSA) as a continuation of the effort to create a harmonized level 1 PSA model for all operational modes of the plant with the goal to use it for further purposes as follows: Real Time Risk Monitor, Maintenance Optimization, Technical Specifications Optimization, Living PSA. (author)

  15. Radioactive waste handling at the Mochovce NPP, 1998-2008

    International Nuclear Information System (INIS)

    Vasickova, Gabriela

    2009-01-01

    The radioactive waste management system at the Mochovce NPP is described. The system addresses technical aspects as well as administrative provisions related to radioactive waste generated within the controlled area, from the waste generation phase to waste sorting, packaging, storage, recording, measurement, and transportation to the Bohunice waste processing facility or transfer to the Mochovce liquid radioactive waste treatment facility. The article also addresses conditions for release from the controlled area to the environment for radioactive waste which can be exempt from the institutional administrative control system or released to the environment on the basis of a valid permission issued by the relevant regulatory authority

  16. Development and implementation of symptom based EOP for Mochovce NPP

    International Nuclear Information System (INIS)

    Zold, T.

    1999-01-01

    In this lecture the history and problems concerning the development and implementation of symptom based emergency operating procedures at the Mochovce NPP are reviewed. In order to increase the safety of nuclear installations and their operation at Mochovce a new programme of Safety measures has been worked out, the core of which are the safety rules administratively labeled as OP-02 introducing the symptom - oriented Emergency operating procedures. Following the selection of partners by the Slovenske Elektrarne power Company a contract was signed with US Westinghouse to work out symptom - based EOPs for the Mochovce power plant to be certified by a letter of approval by Westinghouse in November 1998. Subsequent phases of whole programme for development of EOPs were divided as follows: Phase 1 - Preparation phase; Phase 2 - Emergency operating guideline development and Phase 3 - Emergency operating procedures development and validation

  17. Mochovce NPP safety improvement and completion

    International Nuclear Information System (INIS)

    1997-01-01

    6th Nuclear society information meeting dealt with the completion of the Mochovce NPP with regard to implementation of safety measures. It was aimed to next problems: I. 'Survey' presentation on the situation of the nuclear power industry in partner countries; II. Basic technical presentations; III. Presentations of operators of the other VVER 440/213 NPPs on their activities in the field of safety improvement in relation to IAEA recommendations; IV. Technical solutions of safety improvements ranked with IAEA degree 3 (Report SC 108 VVER); V: Technical solutions of selected Safety Measures ranked with IAEA degree 2 and 1 (Report SC 108 VVER)

  18. Fiddle at financing of Mochovce NPP

    International Nuclear Information System (INIS)

    Beer, G.

    2003-01-01

    Slovak police found out and documented racket in financing of third and fourth block of Mochovce NPP. Damage should be 144 millions Slovak crowns. Investigator consequently accused twenty-three Slovaks from foundation, trump up and supporting of criminal group and deception. Two persons are suggested to be taken to custody. Skoda Praha, which was general supplier of construction for 1,5 billions Slovak crowns, in 2001 allowed to create a connection to let the finances between Slovenske elektrarne, a.s., Bratislava as investor and Skoda as subcontractor to be paid through three mediator companies. Companies got authorization to balance the relationship among all interested subjects. Confused network of 118 treaties was created. They invoiced reward from money current based on these treaties. Reward represented up to 70 per cent of transferred resources in some cases. According to Minister of Domestic Affairs Vladimir Palko it will be necessary to find out where is actually the money. For the time being nobody from NPP is among accused. (Author)

  19. Preparation phase of Mochovce NPP unit 3 and 4 construction completion

    International Nuclear Information System (INIS)

    Cillik, I.; Tvaroska, V.; Liska, P.; Ziman, V.

    2005-01-01

    In this presentation authors deal with preparation phase of Mochovce NPP unit 3 and 4 construction completion. The preparation phase of the Mochovce unit 3 and 4 construction completion gives following main outputs: (a) Detail Safety Concept gives definitive complex safety and technical improvement of MO34, more precise analysis of the total cost of construction completion, a list of potential suppliers and construction completion time schedule; (b) Appendices of Basic Design Documentation and Preliminary SAR serves as basic documentation for UJD SR decision making according to Law No. 541 for start of Realization Phase; (c) The Preparation Phase represents effective tool for start of MO34 construction completion Realization Phase.

  20. External hazards analysis approach to level 1 PSA of Mochovce NPP - Slovakia

    International Nuclear Information System (INIS)

    Stojka, Tibor

    2000-01-01

    Analyses of external events had been first time performed at the design stage of the Mochovce NPP showing sufficiently low contribution of external hazards to core damage frequency. But, based on IAEA document 'Safety problems of WWER-440/213 NPPs and the categorization' (IAEA-EBP-WWER-03, 1996), the need of new reassessment arose due to discrepancy of some origin recommendations in compare with present IAEA ones. Mochovce NPP Nuclear Safety Improvements Program elaborated at the same time included the IAEA recommendations and following improvements were proposed to perform in context of external events. 1. Seismic project and new locality seismic evaluation This safety improvement includes also some 'on site' technical improvements in seismic stability of structures and equipment. 2. Unit specific analyses of extreme meteorologic conditions. This safety improvement focuses on impact of feasible extreme conditions on NPP systems caused by rain, snow and hail storms, frost, winds, low and high temperatures. 3. Analyses of external hazards caused by humans. In this safety improvement were specified: feasible sources of explosions; analyses of hydrogen, gas and propane-calor gas depots; air crash risk. The results of these implemented safety improvements were considered in the PSA study. The External hazards analysis is also part of Level 1 PSA Mochovce NPP performed by PSA Department of VUJE Trnava Inc., Engineering, Design and Research Organization, Slovakia. Some partial analyses are performed in cooperation with following companies DS and S - SAIC, USA and Geophysical Institute Academy of Science, Slovakia Relko, Slovakia. Basic documents are: NUREG/CR-2300 'PRA Procedures Guide - A Guide to the Performance of Probabilistic Risk Assessments for Nuclear Power Plants' and IAEA SS No. 50-P-7 'Treatment of External Hazards in PSA for NPPs. The external hazards analysis consists of following parts: 1. Geography and plant locality; 2. Nearby industry; 3. Extreme

  1. Mochovce NPP experience in the certification and the use of full scope simulator

    International Nuclear Information System (INIS)

    Krenicky, L.

    1999-01-01

    The paper presents some of the Mochovce NPP experience in the full-scope simulator certification process, simulator training programs development, implementation and evaluation, the use of simulator in the all-plant emergency exercises as well as the experience in validation of plant operational procedures.(author)

  2. Mochovce site

    International Nuclear Information System (INIS)

    1997-01-01

    In Mochovce site the construction of four units of WWER 440 NPP with V-213 type of reactor is being carried out. The financing of Mochovce units completion was resolved in April 1996. The completion work commenced at the construction site under leadership of SKODA Prague, the general supplier. The completion work on building part and tests of constructional electric distributions and lightning constructors started. The revisions in technological part were finished, and final protocols from revisions are the basis for starting of completion work. The assembly of transport container anchorage,ventilation system in hermetic areas and hermetic coverage of pools for stored spent nuclear fuel is being carried out. The pre-completion tests of instrumentation and control of ventilation systems, individual dosimetric control in medical station, and tests of nuclear programme according to commissioning and assembling work schedule at the equipment for physical protection of the NPP area started. Inspection activities at Mochovce were performed in accordance with inspection plan for 1996. Evaluation of routine inspections was performed by means of quarterly protocols. Main findings from the inspections performed in Mochovce were in the following areas: (a) deficiencies in the knowledge of the respective regulation and conditions from the Resolution of the state regulatory body, concerning selected employees; (b) training of the selected employees; (c) aim of the measures imposes by inspectors is to eliminate deficiencies in preparation of programmes for pre-completion and completion testing. NRA SR assessment activities at Mochovce NPP were focused mainly on approving and inspecting of design modification to approving programmes for pre-completion and completion testing of system s and equipment and on approving quality assurance programmes. The suggestions of international missions, which reviewed Mochovce safety in the years, were taken into consideration in the programme

  3. Mochovce waste treatment centre

    International Nuclear Information System (INIS)

    Sedliak, D.; Endrody, J.

    2000-01-01

    The first unit of the Mochovce NPP (WWER 440 MW) was put in a test operation in October 1998. The second unit with the same power output was put in the test operation in March 2000. The Nuclear Regulatory Authority of the Slovak Republic in its Decision No. 318/98 of 28 October 1998, by which an agreement with the operation of the Unit 1 of the Mochovce. Nuclear Power Plant was issued, requires to start the construction of the Liquid Radioactive Waste Treatment Centre until January 2004. The subject of this presentation is a system description of the Liquid Radioactive Waste (LRW) management in the Mochovce NPP. The initial part is dedicated to a short description of the radioactive waste management legislation requirements. Then the presentation continues with an information about the LRW production in the Mochovce NPP, LRW sources, chemical and radiochemical attributes, description of storage. The presentation also provides real values of its production in a comparison with the design data. The LRW production minimization principles are also mentioned there. Another part deals with the basic requirements for the technology proposal of the liquid RW treatment, especially concerning the acceptance criteria at the Republic RW Repository Mochovce. The final part is devoted to a short description of the investment procedure principles - design preparation levels and a proposed construction schedule of the centre. (authors)

  4. Study of environmental impact assessment for Mochovce NPP Units 3 and 4. Executive summary. September 2007

    International Nuclear Information System (INIS)

    Anon

    2007-09-01

    SE/ENEL, on a voluntary basis, has prepared new EIA Study for the completion of Units 3 and 4 of Mochovce Nuclear Power Plant (MO34 NPP) according to International current practices and European Directives. The results of the analysis, according to SE/ENEL Environment and Corporate Social Responsibility policies, will be provided to local Communities and Public Authorities. The Environmental Impact Assessment is performed: - in compliance with appendix 11 of Slovak Act. No. 24/2006 'On the assessment of the effects on the environment and on the modification and enlargement of some laws'; - meeting the requirements of the Exhibit II 'Illustrative list of potential social and environmental issues to be addressed in the Social and Environmental Assessment documentation' as reported in the document 'Equator Principles' of 2006 July developed by the International Finance Corporation (IFC). The area of Mochovce NPP is situated in Central Europe in the south-western region of the Slovak Republic (SR) at the western border of the Levice district. The area lies in the south-western part of the Kozmalovske hills mainly in the Hron highlands. From the point of view of the terrestrial and administrative organization of the SR, Mochovce NPP is situated in the eastern part of the Nitra region, in the north-western part of the Levice district, close to the border with the Nitra and Zlate Moravce districts. Mochovce NPP is approx. 12 km from the district capital Levice, which is the largest town within a 20 km distance from the power plant. Initial site preparation began in August 1983. In April 1998 the first fuel was loaded into Unit 1 of Mochovce NPP. The operation started in August 1998. Unit 2 started operation in January 2000. The original Construction Permit No. Vyst. 2010/86 for MO 34 was issued by the District National Committee in Levice on the basis of the Land Planning Decisions on 12 November 1986. This Permit has been renewed firstly on 5 May 1997 by letter of the

  5. Slovak Electric, plc, Mochovce Nuclear Power Plant

    International Nuclear Information System (INIS)

    2000-01-01

    In this popular scientific brochure a brief description of history construction of Bohunice Nuclear Power Plant is presented. The chart of electricity generation in WWER 440/V-213 nuclear power plant is described. Operation and safety improvements at Mochovce NPP as well as environment protection are presented. Basic data of Mochovce NPP are included

  6. National radioactive wasterRepository Mochovce

    International Nuclear Information System (INIS)

    2000-01-01

    In this leaflet the scheme of the Mochovce National radioactive waste repository for the Slovak Republic is presented. The National radioactive waste repository in Mochovce is a surface type storage facility. It is intended for final disposal of solid and solidified low and intermediate radioactive waste produced during the operation of nuclear power plants and institutions located within the territory of the Slovak Republic. The Repository site is situated about 2 km northwest to the Mochovce NPP

  7. 'HSE protection through safe work'. Mochovce NPP is the holder of ISO 14001:2004 and CSN OHSAS 18001 certificates

    International Nuclear Information System (INIS)

    Molnarova, Zuzana; Torda, Anton

    2009-01-01

    The article provides information on the safety of the Mochovce NPP related to occupational health and safety and environmental protection. The facility has earned EN ISO 140001 and OHSAS 18001 certificates. (orig.)

  8. Mochovce Unit 3 and 4 Completion

    International Nuclear Information System (INIS)

    Aquilanti, G.

    2007-01-01

    Purpose of the Feasibility Study was to define in detail all technical, economic, financial, legal and authorization aspects of Mochovce NPP Unit 3 and 4 completion in order to provide Slovenske Elektrarne, a. s. (SE) and ENEL Top Management with all the necessary information for a final decision on Mochovce Unit 3 and 4. Feasibility study has started in January 2006. SE had the commitment to complete the Feasibility Study within 12 months from Closing of SE acquisition (April 2007). In order not to delay completion of Mochovce Unit 3 and 4, SE has decided to perform, in parallel to the Feasibility study, also all design and permitting activities which are required for the completion of Plant. This has involved anticipation of expenses for approximately 700 MSKK (or approx. 20 MEuro). SE was able to announce the positive decision about completion on Mochovce NPP Unit 3 and 4, two months in advance of the deadline.

  9. NPP Mochovce nuclear safety enhancement program

    International Nuclear Information System (INIS)

    Cech, J.; Baumester, P.

    1997-01-01

    Nuclear power plant Mochovce is currently under construction and an extensive nuclear safety enhancement programme is under way. The upgrading and modifications are based on IAEA documents and on those of the Nuclear Regulatory Authority of the Slovak Republic. Based on a contract concluded with Riskaudit from the CEC, safety examinations of the Mochovce design were performed. An extensive list of technical specifications of safety measures is given. (M.D.)

  10. The confirmation audit in Mochovce nuclear power plant

    International Nuclear Information System (INIS)

    Andlova, Z.

    2004-01-01

    Mochovce NPP, as the first plant of the Slovenske elektrarne, a. s., has obtained certificate for the environmental management system (EMS) in September 2002, which was established according to the standard STN ISO 14 001:1996. The Audit EMS was executed by the Det Norske Veritas. Mochovce NPP has obtained the EMS Certificate after compliance of process requests and it is valid for three years. After expire of this period the certification process must be repeated. (author)

  11. Criticality safety analysis of spent fuel storage for NPP Mochovce using MCNP5

    International Nuclear Information System (INIS)

    Farkas, G.; Hascik, J.; Lueley, J.; Vrban, B.; Petriska, M.; Slugen, V.; Urban, P.

    2011-01-01

    The paper presents results of nuclear criticality safety analysis of spent fuel storage for the first and second unit of NPP Mochovce. The spent fuel storage pool (compact and reserve grid) was modeled using the Monte Carlo code MCNP5. Conservative approach was applied and calculation of k eff values was performed for normal and various postulated emergency conditions in order to evaluate the final maximal k eff values. The requirement of current safety regulations to ensure 5% subcriticality was met except one especially conservative case. (Authors)

  12. Role of the team of scientific and technical commissioning support (TSTCS) during Mochovce NPP unit 3 and 4 commissioning

    International Nuclear Information System (INIS)

    Hermansky, J.; Prachar, M.; Sedlacek, M.; Petenyi, V.

    2011-01-01

    The Team of Scientific and Technical Commissioning Support (TSTCS) shall provide an independent support for the Mochovce NPP 3 and 4 Commissioning Department during Mochovce Units 3 and 4 commissioning. This independent support will be in line with the Mochovce NPP 3 and 4 Directive 'Non-active tests and commissioning' and it will be carried out in form of professional and expert works focusing on supervision of fulfilment of requirements for nuclear safety observance. The TSTCS duty to provide for such services during NPP commissioning is specified by Slovak Regulatory Body legislation. The independent TSTCS will supervise; - fulfilment of requirements for nuclear safety during preparation and implementation of commissioning tests; -scientific and technical level of commissioning programmes, and reflection on nuclear safety requirements in commissioning programmes,- commissioning process and test results. Main standpoints of the Team activities for individual unit commissioning stages will be; - assesment of the selected programs of functional tests in installations having an impact on nuclear safety and evaluation of the results of these tests; - assesment of the programs of physics and power commissioning, - assesment of the unit preparedness before fuel loading start; - assesment of the unit preparedness for performing initial criticality and low power commissioning and power commissioning stages; - evaluation of the results of physics and power commissioning stages and sub-stages; - final evaluation of the results from implementing the physics and power commissioning stages. The paper also presents a short description of the Team scope activities, the Team organisation, and a procedure for issuing of standpoints to individual unit commissioning stages. (Authors)

  13. Mochovce Nuclear Power Plant. How was it? Starting of the first block by the eyes of participants in the construction operation

    International Nuclear Information System (INIS)

    Blaha, M.; Bucha, T.

    2008-01-01

    This book is published at 10 th anniversary of commissioning of Mochovce NPP. It consists of two parts: Part I. Story completion of the first block Mochovce nuclear power plant. Part II. Interviews with interested politicians and managers of Mochovce NPP.

  14. The commission of independent experts has labeled Mochovce as safe

    International Nuclear Information System (INIS)

    Grujbar, V.

    1998-01-01

    An independent commission of experts, appointed by IAEA, said that it did not find any faults concerning the integrity of the pressure vessel of the reactor in first block of the NPP Mochovce. The commission, comprising experts from the U.S.A., Belgium, Finland, Germany and Russia, was given the same documents as the Austrian mission, appointed by the office of the Austrian Chancellor, in May. The Austrian experts then expressed two serious concerns about the security of the first block in Mochovce.The experts of the IAEA agreed that the real condition of Mochovce is a lot better that shown in the technical documentation and they did not find any faults. IAEA was in this case, for the first time, an arbiter solving an international dispute about security of a NPP

  15. Health state of population in vicinity of the Mochovce nuclear power plant. Epidemiologic study

    International Nuclear Information System (INIS)

    Celko, M.; Durov, M.; Letkovicova, M.; Holy, R.; Sedliak, D.; Zrubec, M.; Kristufek, P.; Machata, M.; Prikazsky, V.; Rehak, R.; Stehlikova, B.; Vladar, M.

    1999-01-01

    Results of epidemiologic study of health state of population in vicinity of the Mochovce nuclear power plant (Slovak Republic) are presented. This report is reported under the headings: (1) Introduction; (2) Basic information about Mochovce NPP; (3) Assessment of population exposition by environmental factors; (4) Basic conceptions and principles of epidemiologic study; (5) Demography and health state of population; (6) Characterisation of databases and data; (7) Description of demographic and health indicators; (8) Calculation of demographic and health indicators in vicinity of the Mochovce NPP and in control areas; (9) Calculated indicators; (10) Statistical methods and evaluation of calculated indicators; (11) Summary and conclusions; (12) References; Appendixes: Literature review of similar epidemiologic studies; Quantities and units in radiation protection; Definitions of indicators calculation - specification of method

  16. Mikroprogram pre riadenie procesu spájania operandov v architektúre DF KPI

    Directory of Open Access Journals (Sweden)

    Norbert Ádám

    2013-12-01

    Full Text Available V článku uvedená architektúra je založená na výpočtovom modeli „data flow“, v ktorom riadenie výpočtu je založené na spracovaní toku dát. Základným prvkom DF architektúry je koordinačný procesor (CP, ktorý je zodpovedný za riadenie a organizáciu vykonávania inštrukcií. Štruktúrna organizácia CP je navrhnutá ako dynamický multifunkčný systém. Pri vykonávaní operácií môže CP prechádzať rôznymi stavmi, v dôsledku čoho táto jednotka predstavuje dynamický prúdový systém. Prechod a poradie prechodu medzi jednotlivými stavmi CP je podmienený typom spracovaného operátora pri interpretovaní prúdu operandov. Z možných typov operátorov, článok uvádza mikroprogramové riadenie pre jednovstupové operátory.

  17. The nuclear regulatory authority of the Slovak Republic and start-up of the Mochovce NPP

    International Nuclear Information System (INIS)

    Seliga, Mojmir

    1999-01-01

    The important aspect is testing if the nuclear energy in the Slovak Republic is due to obligatory rules acceptable and its operation is regulated by the state through the independent institution - The Nuclear Regulatory Authority of the Slovak Republic (UJD). UJD considers the whole area of public relations an essential component of its activity. UJD intends to serve the public true, systematic, qualified, understandable and independent information regarding nuclear safety of nuclear power plants, as well as regarding methods and results of UJD work. Generally, public information is considered as significant contribution to the creation of confidence into the regulatory work. The public relations are understood as attempts to establish, keep and improve UJD-s good relations to its neighbours through purposeful informing. An Information centre at the offices of UJD was built and opened in October 1995 with IAEA Director General as the first visitor. NPP Mochovee is an example of international co-operation in achieving internationally acceptable safety standards. Companies from France, Germany, USA, Russian Federation, Czech Republic and Slovakia and last, but not least also the IAEA participated significantly on increasing the safety level of this NPP. We have been fully aware of the importance of good communication with press, TV and radio broadcasting in this pre-operation and operation period about nuclear safety, nuclear standard and other nuclear aspects commissioning of the NPP Mochovce in the UJD. The information policy of the UJD was in this period focused on the preparation an actual press releases for general and specialised news- paper and national press agencies. Very important were the frequent presentations the requirement safety stages of the NPP Mochovce inIV and radio broadcasting by headquarters of the UJD. UJD as the state authority provides information related to its competence, namely information on safety of operation of nuclear installations

  18. EGP contribution to Mochovce completion, safety enhancement and operation

    International Nuclear Information System (INIS)

    Letko, A.; Matula, P.

    2000-01-01

    The Re-Evaluation Programme of Mochovce NPP was created in 1995 as an integral part of the completion of the Unit 1 and Unit 2. This program analyzed the general fulfillment of the principle of nuclear safety in the NPP Mochovce project. The analysis has required new corrections of the project, so that the project met the higher safety requirements when starting production. 87 safety measures represent the 'Program'. The basis for their creation were the international missions from 1992 to 1995 which defined. The final safety aim was represented by 'The Technical Specification of the Safety Measures' supported by The Nuclear Power Plant Research Institute and recommended by The Nuclear Regulatory Authority of the Slovak Republic. The technical specification served as a qualified base for the next steps in the pre-project, project and realization stages. (author)

  19. Level 1 PSA study of Mochovce unit 1 NPP (SM AA 10 and 08)

    International Nuclear Information System (INIS)

    Cillik, I.

    1997-01-01

    This paper presents genesis of Level 1 PSA project preparation for all operational modes of Mochovce NPP unit 1 including the description of its' main objectives, scope and working method. The PSA study which includes full power (FPSA) as well as shutdown and low power conditions (SPSA) Level 1 PSA has to support the nuclear safety improvements of the unit. They evaluate the basic design and the benefits of all improvements, which were found necessary to be incorporated before the start-up of the unit. The study includes internal events (transients and under-loss of coolant accident, LOCAs), internal hazards as fires and floods and selected external hazards as earthquake, influence of external industry, extreme meteorological conditions and aircraft crash.The PSA (both FPSA and SPSA) models is developed using the RISK SPECTRUM PSA code. (author)

  20. Mochovce NPP safety measures evaluation from point of view of operational safety enhancement

    International Nuclear Information System (INIS)

    Cillik, I.; Vrtik, L.

    2000-01-01

    Mochovce NPP consists of four reactor units of WWER 440/V213 type and it is located in the south-middle part of Slovakia. At present first unit operated and the second one under the construction finishing. As these units represent second generation of WWER reactor design, the additional safety measures (SM) were implemented to enhance operational and nuclear safety according to the recommendations of performed international audits and operational experience based on exploitation of other similar units (as Dukovany and J. Bohunice NPPs). These requirements result into a number of SMs grouped according to their purpose to reach recent international requirements on nuclear and operational safety. The paper presents the bases used for safety measures establishing including their grouping into the comprehensive tasks covering different areas of safety goals as well as structural organization of a project management of including participating companies and work performance. More, results are given regarding contribution of selected SMs to the total core damage frequency decreasing. (author)

  1. Health state of population in the locality of the Mochovce nuclear power plant after four years of operation

    International Nuclear Information System (INIS)

    Letkovicova, M.; Letkovicova, H.; Letkovic, M.

    2002-01-01

    The Mochovce NPP was put into the operation in 1998. Authors monitor the health state of the population in its vicinity since 1993. The authors recorded this health state also in before-operational safety report of Mochovce NPP. The authors show in the presentation the evaluation of nine years, five before putting of Mochovce NPP into the operation and four during its operation. The aim of the authors is to evaluate the state of chosen health indicators in individual villages in whole monitored region and to try to found out the differences between of their size before and after putting the Mochovce NPP into the operation. Authors used the methods of so-called population epidemiology, where they evaluate the health risks by the system of multidimensional mathematical-statistical methods, by using of the theory of fuzzy sets. The Mochovce region belongs for the long period to the regions with very unfavourable health state. Its very general comparison with one year all Slovak values of the relevant indicators in 2000 are following: more newborn on thousand inhabitants (in 12 per cent) (consequence of wholly older population), higher general mortality of population (in 11 per cent), higher premature mortality of population (in 17 per cent), higher mortality from selected causes, thus malignant tumours of digestive tract (in 20 per cent), higher mortality from malignant tumours of lungs (in 25 per cent), higher mortality from malignant tumours of leukaemia (in 25 per cent). However the authors found out very positive findings in the evaluation of the trends: in the case of fifteen most serious health indicators in the vicinity of Mochovce NPP authors state also mathematically visible influence on the surroundings, which is registerable only in positive meaning. There are created the demonstrable clusters of the villages with low general, also premature women mortality. This locality was far off the industrial and cultural centres, there were always historically higher

  2. Researches of a thermodynamic behaviour of bubbling vacuum system bubble condenser NPP 'Mochovce'

    International Nuclear Information System (INIS)

    Rjeznikov, Iu.V.; Lifshitz, E.V.; Kouznetsov, M.V.; Antropov, V. N.; Doulepov, U. N.; Suchanek, M.

    1997-01-01

    During joint development and designing of the bubbling vacuum system (BVS) equipment for localization of under-loss of coolant accident (LOCA) consequences on NPPs with WWER 440/213, a large volume of experimental and calculational activities have been performed by VTI and SverdNIIchimmash for the substantiation of functionality of this system, and in particular, for bubbler-condenser (BC) design, as a part of BVS. However, not looking on broad introduction of BVS on 16-th NPP units with WWER 440/213, its functionality was subjected to a doubt from experts of different countries. Sequentially, that promoted issue of the IAEA, document and OECD document. Therefore, before commissioning of the NPP 'Mochovce' unit 1 it was decided to execute additional experimental and computational researches for Safety Analysis Report preparation. Within the framework of these BVS thermodynamic behavior researches, in particular the following problems were chosen: (1) The check of a capability of valves DN 250 blocking in an opened position, as a result of return pressure differential on BC, during vent clearing process of the hydro-lock, that can sequentially result in an a drop of efficiency of stem condensation in BC pool; (2) To provide by direct measurements the absence of pressure oscillations dangerous for strength of a BC design in different modes of steam condensation in BC and to execute computational researches of instability of steam condensation processes (for such mode as 'chugging'); (3) Study influences of pool swell and water carry over through check valves DN 500 in the air traps on a BVS functionality; (4) To determine by a computational way the maximum pressure in NPP premises during LOCA, with taking into consideration additional failures of the BC equipment: absence of a water on two and more BC plates and DN 250 valves have blocked in an opened position (conservative conditions). (authors)

  3. Fire protection at the Mochovce nuclear power plant

    International Nuclear Information System (INIS)

    Molnarova, Zuzana; Zeman, Peter

    2009-01-01

    A succinct account is given of current situation in fire prevention at the Mochovce NPP and of past fire events. The fact is stressed that no fire ever occurred at any technological facility of the plant since the startup of the reactor units. Steps required to improve fire safety at a nuclear power plant are highlighted. (orig.)

  4. The design preparation for radiation monitoring system in the frame of completion NPP Mochovce Units 3 and 4

    International Nuclear Information System (INIS)

    Sevecka, S.; Slavik, O.; Kapisovsky, V.

    2009-01-01

    In 1985 a Basic Design of Radiation Monitoring System (RMS) has been elaborated for Mochovce NPP unit 3 and 4 construction. Due to construction interruption in the following years this design solution became obsolete. A new solution of RMS have been developed with conception following that of original Basic Design accommodating also safety measures implemented in RMS of NPP EMO units 1 and 2, and based on modem instrumentation and computer technique. Following the updating of Basic Design documentation the preparation of elaboration of RMS detailed design was carried on. In the frame of this preparation a review of possible suppliers of instrumentation satisfying the conception of radiation monitoring system and the extension of required deliveries has been made. Also criteria on RMS suppliers selection have been determined. The types of monitoring systems and equipment, as well as their quantities, have been specified based on updated Basic Design requirements and production profiles and possibilities of potential suppliers. The required parameters of measurements (including measurement geometry) have been evaluated, as well as requirements of legislation and requirements of proposed RMS architecture. (authors)

  5. PSA analysis focused on Mochovce NPP safety measures evaluation from operational safety point of view

    International Nuclear Information System (INIS)

    Cillik, I.; Vrtik, L.

    2001-01-01

    Mochovce NPP consists of four reactor units of WWER 440/V213 type and it is located in the south-middle part of Slovakia. At present first unit operated and the second one under the construction finishing. As these units represent second generation of WWER reactor design, the additional safety measures (SM) were implemented to enhance operational and nuclear safety according to the recommendations of performed international audits and operational experience based on exploitation of other similar units (as Dukovany and J. Bohunice NPPs). These requirements result into a number of SMs grouped according to their purpose to reach recent international requirements on nuclear and operational safety. The paper presents the bases used for safety measures establishing including their grouping into the comprehensive tasks covering different areas of safety goals as well as structural organization of a project management of including participating companies and work performance. More, results are given regarding contribution of selected SMs to the total core damage frequency decreasing.(author)

  6. Status of the seismic upgrading programme at Mochovce NPP

    International Nuclear Information System (INIS)

    Zajicek, T.; Dolnik, R.; Stevko, M.

    2001-01-01

    The paper provides an overview of the seismic characterisation of the Mochovce site in Slovakia. Particularly, emphasis is given to differences between the original siting and design procedures and the re-evaluation approach, much more based on the data from the micro-earthquake monitoring system installed at the site. Details are also provided for the seismic monitoring of the buildings, as confirmation of the design assumptions. (author)

  7. Irradiation Embrittlement Monitoring Programs of RPV's in the Slovak Republic NPP's

    International Nuclear Information System (INIS)

    Kupca, Ludovik

    2006-01-01

    Four types of surveillance programs were (are) realized in Slovak NPP's: 'Standard Surveillance Specimen Program' (SSSP) was finished in Jaslovske Bohunice V-2 Nuclear Power Plant (NPP) Units 3 and 4, 'Extended Surveillance Specimen Program' (ESSP), was prepared for Jaslovske Bohunice NPP V-2 with aim to validate the SSSP results, For the Mochovce NPP Unit 1 and 2 was prepared completely new surveillance program 'Modern Surveillance Specimen Program' (MSSP), based on the philosophy that the results of MSSP must be available during all NPP service life, For the Bohunice V-1 NPP was finished 'New Surveillance Specimen Program' (NSSP) coordinated by IAEA, which gave arguments for prolongation of service life these units for minimum 20 years, New Advanced Surveillance Specimen Program (ASSP) for Bohunice V-2 NPP (units 3 and 4) and Mochovce NPP (units 1, 2) is approved now. ASSP is dealing with the irradiation embrittlement of heat affected zone (HAZ) and RPV's austenitic cladding, which were not evaluated till this time in surveillance programs. SSSP started in 1979 and was finished in 1990. ESSP program started in 1995 and will be finished in 2007, was prepared with aim of: increasing of neutron fluence measurement accuracy, substantial improvement the irradiation temperature measurement, fixed orientation of samples to the centre of the reactor core, minimum differences of neutron dose for all the Charpy-V notch and COD specimens, the dose rate effect evaluation. In the year 1996 was started the new surveillance specimen program for the Mochovce RPV's unit-1 and 2, based on the fundamental postulate - to provide the irradiation embrittlement monitoring till the end of units operation. The 'New Surveillance Specimen Program' (NSSP) prepared in the year 1999 for the Bohunice V-1 NPP was finished in the year 2004. Main goal of this program was to evaluate the weld material properties degradation due to the irradiation and recovery efficiency by annealing too. The

  8. Jevgenij V. Doc: We do not want to build a monument at Mochovce

    International Nuclear Information System (INIS)

    Janoska, J.

    2004-01-01

    In this paper the interview with the General Manager of Inter RAO JES - Jevgenij V. Doc is published. Inter RAO JES applies for the privatisation of Slovenske elektrarne (Slovak Electric - SE). According to the General Manager of Inter RAO JES, the company does not need a foreign partner to provide financial support after the privatisation of SE, but rather it requires a political support. Plans about Bohunice NPP and of completion of the Mochovce NPP as well as of privatisation of the SE by the Inter RAO JES are presented

  9. Seismic re-evaluation of Mochovce nuclear power plant. Seismic reevaluation of civil structures

    International Nuclear Information System (INIS)

    Podrouzek, P.

    1997-01-01

    In this contribution, an overview of seismic design procedures used for reassessment of seismic safety of civil structures at the Mochovce NPP in Slovak Republic presented. As an introduction, the objectives, history, and current status of seismic design of the NPP have been explained. General philosophy of design methods, seismic classification of buildings, seismic data, calculation methods, assumptions on structural behavior under seismic loading and reliability assessment were described in detail in the subsequent section. Examples of calculation models used for dynamic calculations of seismic response are given in the last section. (author)

  10. Feasibility study for NPP Mochovce Units 3 and 4 completion

    International Nuclear Information System (INIS)

    Tomik, L.; Chakraborty, S.; Hoffelner, W.; Stoian, A.

    2004-01-01

    The system dynamic approach presented in this study by modelling the behaviour of Slovak market on the basis of system dynamic model (Forrester model), enables real mix in the extend of 12 years and helps understanding of the market limits. In addition this tool can be used for sensitivity calculations depending on many parameters to develop possible trends in the economic development of the Slovak Republic. If both nuclear power options are maintained then it becomes obvious that electric excess energy is produced and could be exported. This export option remains for the situation that a strong growth of the gross national product is assumed without any increase in energy efficiency. Between these extremes is the scenario that Bohunice 1, 2 off is balanced by Mochovce 3, 4 on and increasing demand this will lead to more moderate but still not negligible potential of CO 2 increase. Switching off Bohunice 1, 2 and not switching on Mochovce 3, 4 leads to energy need which must be counterbalanced either by investments in other power plants or by import energy. As far as domestic production is concerned even assuming 50 % CHP production leads to partly remarkable additional CO 2 -production which might infringe on a long term basis with the Kyoto goals. Assuming additional CO 2 -emissions from increasing traffic real problems can be expected in such a case. To maintain national nuclear capabilities in Slovakia is very important for today and for future of nuclear energy option in enlarged European Union. (authors)

  11. Participation of Skoda Praha a.s. in completion of NPP Mochovce

    International Nuclear Information System (INIS)

    Poukar, F.

    1997-01-01

    The history of the construction of the Mochovce nuclear power plant is briefly described. In 1995, after obtaining promises of loans from Czech banks the Slovak government decided that the completion of the mechanical and electrical parts of units 1 and 2 would be placed with Skoda Praha in the position of general supplier; Skoda together with Siemens and Framatome would also be charged with implementing the safety measures necessary to reach European standards. Evaluation of safety studies and risk audits, and elaboration of safety measures are now under way. (M.D.)

  12. NPP Mochovce - a project of extraordinay significance

    International Nuclear Information System (INIS)

    Chwolik, I.; Debru, M.

    2000-01-01

    In this paper and in this presentation the reactor safety upgrading of two blocks of the NPP V-1 Bohunice, some results of participation on safety upgrading by the German-French consortium EUCOM (Framatome and Siemens-KWU) are presented. (author)

  13. The management of safety within the completion of units 3. and 4. in NPP Mochovce

    International Nuclear Information System (INIS)

    Ocenas, M.

    2009-01-01

    The contribution defines the way of management of safety and protection of health and protection against the fire during completion of units 3. and 4. in NPP Mochovce. The creation of the management of safety raised from the legal and other requirements applied in the civil activities and mainly from the requirements for coordination of safety on the site. The whole system is methodically managed through the 5 basic documents so-called 'Building rules': 1) Safety-technical conditions of performance in SE, Inc. Bratislava (project MO34); 2) MO34/1/MNA-003.00-02 the elaboration of the integrated safety plan; 3) MO34/1/NA-003.00-03 risks analyse; 4) PNM3460100 Integrated safety plan for completion of Units 3.and 4 in NPP Mochovce; 5) Project of construction organization. The system itself of the management of the safety prevention must by provided by the supplier in compliance with the standard OHSAS 18 001 and ISO 14001, and in compliance with the requirement of the builder applied in the technical specification for the contract. Most of necessary related documentation of Safety plan for the site is usually part of the documentation for quality management of contractor. Therefore it is necessary to put the reference in each chapter of the Safety plan for site and the standpoint how to apply it for the particular specific situation. The coordinator is mandatory to manage the prevention for the part of safety of specified site and to coordinate the activity of suppliers during the works tie in this way, that the each contractor shall meet the safety requirements given by safety plan and also to identify and to eliminate the risks menaced in the particular work places or the suppliers each other. The builder established its own control system and for this purpose he settled the data base so-called 'The system of corrective and precautionary activities'. The system registers in its data base all discrepancies determined during the regular controls of the head workers

  14. Commissioning of Mochovce 1 - Important achievement of the world's nuclear industry

    International Nuclear Information System (INIS)

    Holy, Robert; Petrech, Rastislav

    1999-01-01

    The nuclear power industry has been recently perceived by the general public as a specific industrial branch stretching its activities far beyond the conventional industrial standard. Similarly, the stage of testing and commissioning of a nuclear power plant is perceived as a specific stage in the plant life-cycle. This is a complicated process not only in technical terms, but in the context of nowadays, it is also one of the key periods in terms of public relations and public acceptance. The stage of commissioning unit 1 of Mochovce Nuclear Power Plant evoked a real communication media war between defenders and opponents of the nuclear industry started early in 1998 in Slovakia, as well as in other, mostly neighbouring countries. It should be noted, however, that the Mochovce plant has never been a technical problem as confirmed a number of international regulatory missions and audits, even though its construction was stopped in early 90's. The result of the war between the opponents and 'nuclear experts' was more or less clear to a thinking human being - a compromise could have been the only result. The compromise which is in fact a victory of the side of technical development, and loss of those lobbying for a nuclear-reactor-free central Europe. This article brings a review of events that accompanied commissioning activities of Mochovce NPP unit I which were important in terms of public relations

  15. Completion of the VVER 440/213 NPP Mochovce incorporation enhanced safety features

    International Nuclear Information System (INIS)

    Charbonneau, S.; Eckert, G.

    1996-01-01

    The cooperation between the western countries and the countries of ex-eastern block in the field of nuclear safety is recent and still limited. The main reasons for this situation are limited or non existent capabilities of these countries for financing as well as non acceptable legal conditions concerning the third party nuclear liability in this part of Europe. Nevertheless, Framatome and Siemens associated in the consortium named EUCOM, have signed in April 1996 the contract of about 100 million US dollars with Slovak electricity company (SLOVENSKE ELEKTRARNE-SE) for upgrading the Units 1 and 2 of Mochovce Nuclear Power Plant according to the western safety standards. This is the first important project involving west-european companies in the modernisation of Russian type of pressurized water reactor (VVER 440/213). The consortium will cooperate with other partners involved in the project: Slovak, Czech and Russian. The financing of the project will be provided mainly form Slovak and Czech sources. The safety upgrading will be financed through French and German buyer credits. French company Electricite de France (EDF) will be the consultant for SE. The safety upgrading measures have been elaborated taking into account the recommendation of Vienna International Atomic Energy Agency (IAEA) and the evaluation of the safety realised by RISKAUDIT, the common organization of German and French safety authorities (GSR and IPSN). Hence all guaranties have been taken to fulfil the western safety criteria for Nuclear Power Plant Mochovce. (author)

  16. Completion of Units 3 and 4 at Mochovce NPP

    International Nuclear Information System (INIS)

    Aquilanti, G.

    2009-01-01

    After the completion of a feasibility study, SE/ENEL decided to complete Mochovce Nuclear Power Plant Units 3 and 4 in April 2007. In July 2008, after a revision of the Basic Design that led to the inclusion of additional safety improvements, the European Commission issued a positive viewpoint on the decision. In August 2008 the Slovak Nuclear Regulatory Authority issued a permit for 'modification of a construction project prior to its completion', approving the Basic Design modifications: the kick-off of site activities was on November 2008. In December 2008, SE initiated the Environmental Impact Assessment (EIA) procedure aimed at obtaining the Operational License by submitting the EIA intent to the Ministry of Environment. A multi contractual strategy was adopted for the completion works: the total number of foreseen contracts is about 250 (90 main and additional 160 minor). In the following the present status of the project is presented: in particular, the Project Management system implemented by SE/ENEL is described and the progress of the engineering, fabrication and construction activities is analyzed. (author)

  17. Completion of Mochovce 1 and 2 nuclear power plant project

    International Nuclear Information System (INIS)

    Valach, J.

    2000-01-01

    Commissioning of the Mochovce Nuclear Power Plant unit 2 fully completed the Mochovce unit 1 and 2 project. The power plant construction passed through a complicated evolution since early 80's. The genesis started with the change of the plant location due to a seismic resistance requirement raised by the former Czechoslovak Atomic Energy Commission, change of the design and contractor of the Instrumentation and Control system in early 90's, halt of construction in 1993 till 1996 due to a lack of funding, as well as a series of international reviews of safety aspects. All the obstacles had been overcome in the end, and completion works were re-started in 1996. Looking back to the unit 1 and 2 completion project, I would like to highlight some aspects of the project, particularly the level of safety, technical and organisational conditions, and terms of funding. The most important argument for completion of the plant was that VVER 440/213 reactor units were distinguished with very high level of passive safety, even overcoming Western-type PWR's in some aspects. The replacement of the original I and C system was another important contribution to the initial level of safety. International safety reviews performed at Mochovce NPP between 1990 and 1995 (Siemens, EdF, IAEA, RlSKAUDIT) confirmed the high level of safety of VVER 440/213 reactors, however, pointed out at some safety issues which had not been dealt with in the design. Those included e.g. the 'external risks', primary-to-secondary leaks, qualification of pressurizer safety valves, and others. It is necessary to stress that the Safety Improvement Programme defined for Mochovce NPP to comply with international standards did not become the most important part of the completion project due to external pressures, but based on natural requirements on nuclear power plant safety level generally accepted in 90's. The good example could be the seismic resistance of the plant which, though designed as seismic resistant

  18. Mochovce power plant units 3 and 4

    International Nuclear Information System (INIS)

    Cuba, J.

    2003-01-01

    The report gives the basic technical data and history of the construction of the units 3 and 4 of the Mochovce NPP.The current status of the units completion according to the original plan is: civil part - 70%; mechanical part - 30%; electric and IC equipment - 1%. Strategic plan for the preservation of the units 3 and 4 has been developed in accordance with TECDOC-1110. In implementation of the plan preservation activities are performed for the components located and built-in on the site and in storehouses. Preservation with dryers and protective coatings is applied. The factors of possible component degradation are determined. Ventilation components are used for improving the climate conditions in the primary part of the reactor building. Temperature and humidity measurements are done and temperature control is set. Special pre-service inspections beyond the basic scope of preservation and protection works are conducted of steam generator and reactor pressure vessel. The implementation of the design data protection and enhancement is discussed. The feasibility study of units 3 and 4 completion funding has been developed in 2002

  19. Participation of SKODA JS in the construction of the Temelin and Mochovce nuclear power plants

    International Nuclear Information System (INIS)

    Svec, A.; Zach, J.; Ruzicka, P.

    2000-01-01

    SKODA JS is the traditional manufacturer of WWER type reactor equipment and also supplier of the primary circuits and of equipment for the transport, refuelling and storage of fuel for Ver type nuclear power plants built in the Czech and Slovak Republics. The paper deals with activities of the company SKODA JS at two power plants whose reactor units are close to completion, viz. the Mochovce NPP in the Slovak Republic (4 x Ver 440 MW; unit 1 was put in operation in 1998, unit 2 is in the stage of commissioning, units 3 and 4 are not to be completed) and the Temelin NPP in the Czech Republic (2 x Ver 1000 MW, commissioning of units 1 and 2 is expected in 2001 and 2002, respectively). The scope of supplies to the two nuclear power plants (detailed design, delivery of equipment, installation, commissioning) and the course of construction from SKODA JS's viewpoint are described. The most important design changes and improvements made during the construction are highlighted. (author)

  20. National Radwaste Repository Mochovce

    International Nuclear Information System (INIS)

    2000-01-01

    In this leaflet the National Radioactive Waste Repository in Mochovce (Repository) is described. The Mochovce National Radioactive Waste Repository is a surface multi-barrier type storage facility for solid and treated solidified radioactive wastes generated from the Slovak Republic nuclear power plants operation and decommissioning, research institutes, laboratories and hospitals. The Repository comprises a system of single- and double-row storage boxes. The first double-row is enclosed by a steel-structure building. The 18 x 6 x 5.5 m storage boxes are made of reinforced concrete. The wall thickness is 600 mm. Two-double-rows, i.e. 80 storage boxes were built as part of Stage I (1 row = 20 storage boxes). Each storage box has a storage capacity of 90 fibre concrete containers of 3.1 m 3 volume. The total storage capacity is 7200 containers with the overall storage volume of 22320 m 3

  1. We should use nuclear power plants as good as possible

    International Nuclear Information System (INIS)

    Kaplanova, J.

    2004-01-01

    In this paper visit of Austrian journalist Christian Hunger (redactor of the Austrian broadcast OE1) on the Jaslovske Bohunice NPP and Mochovce NPP is described. Upgrade of the Jaslovske Bohunice NPP and finishing of a building of the Mochovce NPP as well as shut-down of the first and second blocks of the Jaslovske Bohunice NPP are discussed

  2. Preparation of physics commissioning of Mochovce units 3 and 4

    International Nuclear Information System (INIS)

    Sedlacek, M.; Chrapciak, V.

    2010-01-01

    The Project 'Mochovce Units 3 and 4 Completion' started in 2009 and it will be finished in 2013. VUJE, Inc. is one of the five main Project contractors for the Nuclear Island and it is responsible, inter alia, for Mochovce Units 3 and 4 commissioning. The commissioning of Units 3 and 4 includes the stages of Physics Commissioning and Power Commissioning. This paper deals with the preparation of Mochovce Units 3 and 4 Physics Commissioning. In the paper there is presented a preparation of some commissioning documents, e.g. 'Quality Assurance Programme', 'Commissioning Programme', 'Stage Programme for Physics Commissioning', 'Test working programmes', 'Neutron-physics characteristics for Physics and Power Commissioning', etc. The scope of Physics Commissioning is presented by list of tests. For assessment of tests results so-called three-level acceptance criteria will be applied: realization, design and safety criteria. In the paper there are also presented computer codes, which will be used for neutron-physics characteristics calculation and the fuel loading scheme for the reactor core of Mochovce Unit 3. (Authors)

  3. Requirements and possible upgrading concept for the WWER-440/213: Mochovce NPP structures under seismic conditions

    International Nuclear Information System (INIS)

    Freiman, M.

    1993-01-01

    The Mochovce-Nuclear Power Plant is one of the WWER-440/213 plants which has been designed against earthquake. Nevertheless, the design earthquake has not been assessed adequately to the seismic hazard at the site. A new seismic design shall include an increased seismic input and assure an acceptable standard of safety. This contribution is related to some design aspects of civil structures for this nearly finished plant, such as: existing design and its margins with regard to the employed codes; requirements for a new design concept; effects to be expected by an increased design earthquake; applicable design methods; use of inelastic design spectra, behavior factors and capacity design; feasible upgrading measures. (author)

  4. Analysis of the methodical component of core power density field calculation error on the basis of Mochovce-1 commissioning tests

    International Nuclear Information System (INIS)

    Brik, A.

    2009-01-01

    In the first decade of June 2008, during the power commissioning of the reactor at the Mochovce NPP unit 1, the experiment with reducing the thermal power of core almost to the balance-of-plant (BOP) needs was performed. After the reactor has operated for seven hours at low power (about 200 220 MW (thermal)), its power was increased (at a rate of about 0.25% of N nom /min) to the initial level, close to 107% (1471 MW). During the experiment, core parameters, which were subsequently used for comparing the measured data with the results of experiment simulation calculations, were recorded in the reactor in-core monitoring system database. Calculated and measured levels of critical concentrations of boric acid were compared, along with power density distributions by fuel elements and assemblies obtained both by the KRUIZ in-core monitoring system and on the basis of calculations simulating reactor operation in accordance with the given core power variation schedule. The final stage consisted of assessing the methodical component of power density micro- and macro-fields calculation error in the core of Mochovce-1 reactor operating with varying load. (author)

  5. Analysis of the methodical component of core power density field calculation error on the basis of Mochovce-1 commissioning tests

    International Nuclear Information System (INIS)

    Brik, A.

    2009-01-01

    In the first decade of June 2008, during the power commissioning of the reactor at Mochovce NPP unit 1, the experiment with reducing the thermal power of core almost to the balance-of-plant needs was performed. After the reactor has operated for seven hours at low power (about 200 220 MW (thermal)), its power was increased (at a rate of about 0.25% of N nom /min) to the initial level, close to 107% (1471 MW). During the experiment, core parameters, which were subsequently used for comparing the measured data with the results of experiment simulation calculations, were recorded in the reactor in-core monitoring system's database. Calculated and measured levels of critical concentrations of boric acid were compared, along with power density distributions by fuel elements and assemblies obtained both by the KRUIZ in-core monitoring system and on the basis of calculations simulating reactor operation in accordance with the given core power variation schedule. The final stage consisted of assessing the methodical component of power density micro- and macro-fields' calculation error in the core of Mochovce-1 reactor operating with varying load. (Authors)

  6. Recent history of Mochovce Nuclear Power Plant

    International Nuclear Information System (INIS)

    Holy, R.

    1999-01-01

    Mochovce Nuclear Power Plant has been an open project involving a wide international co-operation of numerous organisations of countries stretching from the Atlantic coast up to the Urals that make it a truly European project. The units at Mochovce are the later V-213 type of Soviet-designed WWER-440 reactors. They therefore incorporate a number of improvements over the earlier V-230 type. There are four units at Mochovce site: unit 1 has been in operation since summer 1998, unit 2 is currently in the stage of commissioning tests and scheduled for operation by the end of this year, and unit 3 and 4 are still waiting for the final governmental decision about their completion, currently 40% and 30% completed respectively. Beginning in 1981, the construction works were stopped in early 90's due to the decision on replacement of the original I and C system, as well as lack of funding afterwards. Slovenske elektrarne, a.s. have been working to resuscitate the project focusing initially on completion of the units 1 and 2 with assistance of western companies. one month later the governmental guarantees were given for loans and Slovenske elektrarne signed loan agreements to finance the project completion, as well as construction completion agreements with contractors. (Author)

  7. Part II. Chapter VII. Lack of knowledge has generated misconceptions about WWER in Western Europe

    International Nuclear Information System (INIS)

    Bucha, T.

    2008-01-01

    In this interview Mr. Giancarlo Aquilanti (Project Director Mochovce NPP, Unit-3 and Unit-4, the Slovenske elektrarne, a. s., a member of ENEL) evaluates reactor safety in Mochovce NPP. Perspectives of development of nuclear energy in the Slovak Republic and Italia are discussed.

  8. Ukraine is nuclear Great Power

    International Nuclear Information System (INIS)

    Svolik, S.

    2005-01-01

    In this paper the interview with Mr. Jaroslav Holubec - the Director of the Mochovce NPP is published. MR. Jaroslav Holubec with Mr. Stefan Niznan - the Director of the 3 r d and 4 th blocks of the Mochovce NPP - took part in opening commissioning of blocks on the Rovno NPP and Khmelnitskaya NPP, both with installed reactors 1,000 MW. Development of nuclear energetics in the Ukraine is discussed. The share of nuclear energy on the production of the Ukraine constitutes 42 %

  9. Training of personnel

    International Nuclear Information System (INIS)

    1997-01-01

    Selected staffs (in the area of NPPs) are examined by the State Examining Committee established by Nuclear Regulatory Authority of the Slovak Republic (NRA SR's) chairman. The committee consists of representatives of NRA SR , Bohunice NPPs, Mochovce NPP, Research Institute of Nuclear Energy and experts from the Faculty of Electrical Engineering and Information Technology of the Slovak Technical University. The review of selected personnel of NPP V-1, V-2 and Mochovce NPP which passed exams in 1996 is given. NRA SR paid attention to the upgrading training process of individual categories of staff for V-1, V-2 and Mochovce NPPs, simulator training and training with computerized simulation system according to the United criteria of nuclear installation personnel training that started in 1992. During the year, an inspection was performed focused on examination of technical equipment of the simulator of Mochovce NPP, professional eligibility and overall preparation of simulator training including simulator software. Throughout the year launching works continued at the simulator with the deadline of commissioning to trial use operation in the first half of 1997

  10. Slovak National Prize for Quality 2004

    International Nuclear Information System (INIS)

    Steflik, Marian

    2009-01-01

    Competition for the Slovak National Prize for Quality is a milestone in the history of the Mochovce NPP. The Mochovce NPP won the prize in 2004. The article describes in detail the preparatory efforts including not only technological issues but also various administrative challenges. The impacts of this achievement on the plant's subsequent development are also highlighted. (orig.)

  11. Summary revaluation of energetic start-up of the unit 1 of nuclear power plant Mochovce

    International Nuclear Information System (INIS)

    Sarvaic, I.; Miskolci, M.

    1998-01-01

    The document contents stage revaluation of energetic start-up of the unit 1 of nuclear power plant Mochovce. Test results of the stage of energetic start-up are summarized in the document, valuation of important systems and block devices as well as fulfilling the operation limits and conditions has been performed. On that base conclusions and recommendations for start-up the unit 2 and for commercial operation of the unit 1 are elaborated. The valuation has been elaborated by a scientific management for start-up nuclear power plant Mochovce of nuclear safety of nuclear power facilities. Scientific management for start-up of nuclear power plant Mochovce performed continuous valuation of individual power levels after ending of each individual level and it gave its valuation to energy power level with recommendations and conditions for further start-up process and operation. Scientific management finished its activity at the unit 1 of nuclear power plant Mochovce according to a statute of scientific management for start-up after successful completion of conclusive block run. Scientific management group was founded in February 1998 at nuclear power plant Mochovce. Its members are experts from Slovak, Czech, Russian and French organizations which are participating in power plant completion. Members are listed in a supplement No. 2

  12. EDF Contribution to the Mochovce completion and safety upgrading project

    International Nuclear Information System (INIS)

    Norvez, G.

    1997-01-01

    The challenge that SE a.s. took up in April 1996 to start Mochovce units 1 and 2 within a very demanding time frame and in satisfactory conditions is on the way to being wined. EMO managed to put in place an organisation able to ensure the continuity of the design and construction works and to integrate the requirements of modern safety. EDF is proud and happy to contribute to this effort by making available its expertise and experience in building and operating nuclear power plants. The success of Mochovce will not only contribute to the Slovak electricity needs coverage, but will be the first demonstration of a soviet design nuclear power plant brought to international safety standards. (author)

  13. Summary revaluation of cold testing of the first block of nuclear power plant Mochovce; Suhrnne zhodnotenie neaktivneho vyskusania 1. bloku jadrovej elektrarne Mochovce

    Energy Technology Data Exchange (ETDEWEB)

    Miskolci, M; Sarvaic, I [Nuclear Power Plants Research Institute Trnava, Inc., Okruzna 5, 918 64 Trnava (Slovakia)

    1998-04-03

    The document contents summary revaluation of the stage of cold testing of the first unit of nuclear power plant Mochovce. The valuation is processed in individual systems with safety significance. The process and results of system testing and their conclusions for the block readiness for active testing are summarized in the document. The valuation has been elaborated by a scientific management for start-up of nuclear power plant Mochovce as an independent conductor assistance for activation check from the nuclear safety point of view. The valuation of the activation results of systems in the first unit of nuclear power plant was processed as of 15.3.1998 61 figs., 44 tabs., `Translation to english is available from OMEGA INFO, Vysehradska 33, SK-84215 Bratislava, Slovak Republic, E-Mail: kuruc at fns.uniba.sk`

  14. Rapid separation and determination of 107Pd in radioactive waste produced during NPP A-1 decommissioning

    International Nuclear Information System (INIS)

    Boris Andris; Miroslav Prazsky; Ferdinand Sebesta

    2015-01-01

    Procedure for 107 Pd determination in radioactive wastes coming from decommissioning of NPP A-1 is proposed and verified. 107 Pd was separated and purified by Pd precipitation with dimethylglyoxime (DMG) and/or ferric hydroxide precipitation. 107 Pd yield was determined gravimetrically by weighing the Pd(DMG) 2 precipitate. 107 Pd counting was performed using liquid scintillation counter (LSC-TDCR) and scintillation cocktail Hionic Fluor. In all analyzed samples the determined activities of 107 Pd were lower than MDA. Nevertheless such analyses permit the decision concerning the storage of solidified wastes in the Mochovce regional repository. (author)

  15. Performance assessment of Mochovce repository

    Energy Technology Data Exchange (ETDEWEB)

    Mrskova, A; Hanusik, V [Dept. of Accident Management and Risk Assessment, Vyskumny Ustav Jadrovych Elektrarni, Trnava (Slovakia)

    2000-07-01

    The near-surface disposal site at Mochovce is designed for low-level and intermediate level radioactive waste. It is a vault-type concrete structure housing the reinforced concrete containers as the final waste packages. This paper shortly presents the long-term safety analysis methods applied for the post-closure phase of the repository. The main aim of paper is description of the philosophy of analysis, development of the scenarios, their modeling and comparing of the results of normal evolution scenario, alternative scenario and intruders scenario for some radionuclides. (author)

  16. Performance assessment of Mochovce repository

    International Nuclear Information System (INIS)

    Mrskova, A.; Hanusik, V.

    2000-01-01

    The near-surface disposal site at Mochovce is designed for low-level and intermediate level radioactive waste. It is a vault-type concrete structure housing the reinforced concrete containers as the final waste packages. This paper shortly presents the long-term safety analysis methods applied for the post-closure phase of the repository. The main aim of paper is description of the philosophy of analysis, development of the scenarios, their modeling and comparing of the results of normal evolution scenario, alternative scenario and intruders scenario for some radionuclides. (author)

  17. Evaluation of power commissioning of the Mochovce Unit 1 demonstration run

    International Nuclear Information System (INIS)

    Sarvaic, I.; Miskolci, M.

    1998-01-01

    The document contains evaluation of the 144 hour demonstration run of the Mochovce Unit 1. In the document, the courses and results of additional tests in this phase of power commissioning are summarized, evaluation of the performance of important systems and equipment of the unit is carried out, as well as of the compliance with Limits and Conditions in the course of the demonstration run. On this basis, conclusions are drawn and recommendations given for the unit to by ready for trial operation. The evaluation was developed by the scientific management of the Mochovce commissioning providing an independent support for the operators for supervising the commissioning tasks from the point of nuclear safety

  18. Chapter 7. Radioactive wastes

    International Nuclear Information System (INIS)

    2000-01-01

    The inspection and assessment activities of Nuclear Regulatory Authority of the Slovak Republic (UJD) focused on minimization of activity and the quantity of produced radioactive waste (RAW), and on increasing safety of waste management. The general scheme of rad-waste management in the Slovak Republic is presented. The radioactive wastes produced during the operation of NPP V-1, NPP V-2 and NPP Mochovce in 1999 are listed.Liquid RAW was treated and conditioned into a solid form at the nuclear facility Technology for treatment and conditioning of RAW. In 1999 combustible solid waste was treated at the nuclear facility Incinerator of VUJE Trnava. Produced liquid and solid RAW are stored at designed equipment at individual nuclear installations (in case of NPP V-1, NPP V-2 Bohunice and NPP Mochovce in compliance with the Regulation No. 67/1987 Coll. law).The status of free capacity of these storages as of 31.121999 is presented. Storage solidified product built the SE-VYZ was fully filled at the end of 1999. In 1999 there was a significant improvement in the process of radioactive waste management by: (A) issuing approval for commissioning the National Repository for RAW, (B) issuing approval for commissioning the Treatment and Conditioning Center for RAW, (C) having the application for approval to transport conditioned RAW to the National repository Mochovce in the final stage of evaluation. At the beginning of 2000 it is realistic to expect that RAW conditioned in the Conditioning center of RAW will start to be disposed at the National repository of RAW in Mochovce

  19. Irradiation temperature measurement of the reactor pressure vessel surveillance specimen in the programmes of radiation degradation monitoring

    International Nuclear Information System (INIS)

    Kupca, L.; Stanc, S.; Simor, S.

    2001-01-01

    The information's about the special system of irradiation temperature measurement, used for reactor pressure vessel surveillance specimen, which are placed in reactor thermal shielding canals are presented in the paper. The system was designed and realized in the frame of Extended Surveillance Specimen Programme for NPP V-2 Jaslovske Bohunice and Modern Surveillance Specimen Programme for NPP Mochovce. Base design aspects, technical parameters of realization and results of measurement on the two units in Bohunice and Mochovce NPPs are presented too. (Authors)

  20. VUJE capabilities for participation in the development of Slovak power sector

    International Nuclear Information System (INIS)

    Liska, P.

    2004-01-01

    In this presentation author deals with VUJE Trnava, Inc. capabilities for participation in the development of Slovak power sector. It is concluded that VUJE supports the completion of Mochovce units 3 and 4 as the most effective option; VUJE calls of the Slovak government to revive negotiations on a revision of a commitment to close V1 units Bohunice NPP in 2006 or 2008 respectively; VUJE is prepared to be an important participant in supply system for Mochovce NPP Units 3 and 4

  1. Some experience from seismic check-ups of components of Mochovce nuclear power plant

    International Nuclear Information System (INIS)

    Masopust, R.

    1987-01-01

    The first Czechoslovak nuclear power plant with the so-called partial anti-seismic design will be built in Mochovce. The evaluation of seismic resistance is prescribed only for equipment and systems which secure the safe reactor shutdown, the withdrawal of residual heat and prevent uncontrolled release of radioactivity into the environment. The following variants were compared in the calculation analysis of the primary loop of the WWER-440 reactor for the Mochovce nuclear power plant: the seismically unsecured loop of a usual design for WWER-440 nuclear power plants, the loop provided with mechanical or hydraulic dampers and the loop provided with viscose shock absorbers. The tests showed that technically most suitable is the use of viscose shock absorbers which do not completely block the movement of the system during the earthquake but absorb it intensively. The viscose shock absorbers are also much cheaper than the dampers. Briefly described is experience with the experimental evaluation of the seismic resistance of components of the Mochovce nuclear power plant. Great difficulty was encountered by the non-existence in Czechoslovakia of a seismic table allowing simultaneous excitation in the vertical and horizontal directions. (Z.M.). 18 refs

  2. Quality assurance

    International Nuclear Information System (INIS)

    1996-01-01

    The main efforts of Nuclear Regulatory Authority of the Slovak Republic (NRA SR) was focused on support of quality assurance programmes development at responsible organizations Bohunice V-1 and V-v and Mochovce NPPs and their inspection. Development of the level two documentation of a partial quality assurance programme for NPP operation continued at Mochovce NPP. Most of documentation has been submitted to NRA SR for comments and approval. NRA SR invited a mission of French experts to Mochovce NPP to review preparation and performance of internal audits that would be beneficial for improvement in this kind activities at the NPP. Bohunice NPP continued in development of a partial quality assurance programme for operation. The Quality Assurance Programme submitted to NRA SR for approval. Based on a request of Bohunice NPPs, NRA SR consulted the draft quality assurance programme developed by Siemens for stage of the 'Basic Design' of V-1 NPP upgrading. The programme had not been submitted for approval to NRA SR prior to completion of works by Siemens. Based on an internal audit that had been performed, corrective measures were proposed to meet requirements on review and approval of suppliers quality assurance programmes. Requirements related to the quality assurance at nuclear installations were prepared to be incorporated into principles of a act on peaceful use of nuclear power in Slovak Republic

  3. Chapter 9. Personnel qualification and training

    International Nuclear Information System (INIS)

    2001-01-01

    The overall training system and the development of projects for training of all categories of NPP V-1, NPP V-2 Bohunice, SE-VYZ and NPP Mochovce staff were the subject of Nuclear Regulatory Authority of the Slovak Republic (UJD) attention. During 2000, the following inspections were carried out on nuclear personnel training: (a) NPP Bohunice: an inspection focused on compliance with requirements for staff qualifications and compliance with the prescribed training of Bohunice plant staff ; (b) NPP Mochovce: an inspection focused on compliance with the requirements for staff qualifications and compliance with the prescribed training of NPP Mochovce staff; an inspection focused on verifying the simulator aided training; an inspection focused on checking the preparedness of NPP Mochovce operation and technical personnel for NPP Mochovce Unit 2 operation; (c) Technology for treatment and conditioning of radioactive waste Bohunice (BSC): an inspection focused on compliance with the requirements for staff qualifications and compliance with the prescribed training of SE-VYZ staff; VUJE Trnava: verification of technical equipment and professional skills of VUJE Trnava staff and tasks arising out of the 'Authorisation on nuclear installation staff training'. Examinations of selected personnel were scheduled according to the plan of examining committee meetings. For each examined person written tests are generated by the computer from the database of test questions at the Training Centre of VUJE Trnava for individual positions - categories of selected staff of NPP V-1 and NPP V-2 Bohunice and NPP Mochovce so that the examination questions both in written and oral part equally cover individual facilities and regimes of operation of NPP. The database is continuously updated, thereby containing new questions resulting from the recent changes carried out at NPPs. A part of the examination in case of promotion to a higher position is the practical part, which is conducted under

  4. Press travel to the Mochovce power plant in Slovakia

    International Nuclear Information System (INIS)

    1998-07-01

    This press dossier gives, first, a general presentation of the Mochovce power plant of the republic of Slovakia (history, technical characteristics, safety aspects, technical particularities of VVER 440/213 reactors (safety analysis, recent improvements), financing of the modernization project). Then, the activities of the Framatome group in central and eastern Europe are presented (partnerships, cooperation agreements and contracts). (J.S.)

  5. Summary revaluation of cold testing of the first block of nuclear power plant Mochovce

    International Nuclear Information System (INIS)

    Miskolci, M.; Sarvaic, I.

    1998-01-01

    The document contents summary revaluation of the stage of cold testing of the first unit of nuclear power plant Mochovce. The valuation is processed in individual systems with safety significance. The process and results of system testing and their conclusions for the block readiness for active testing are summarized in the document. The valuation has been elaborated by a scientific management for start-up of nuclear power plant Mochovce as an independent conductor assistance for activation check from the nuclear safety point of view. The valuation of the activation results of systems in the first unit of nuclear power plant was processed as of 15.3.1998

  6. Slovenske elektrarne, a.s., Mochovce Nuclear Power Plant

    International Nuclear Information System (INIS)

    1998-01-01

    In this booklet the uranium atom nucleus fission as well as electricity generation in a nuclear power plant (primary circuit, reactor, reactor pressure vessel, fuel assembly, control rod and reactor power control) are explained. Scheme of electricity generation in nuclear power plant and Cross-section of Mochovce Nuclear Power Plant unit are included. In next part a reactor scram, refuelling of fuel, instrumentation and control system as well as principles of nuclear safety and safety improvements are are described

  7. Current situation of the project of 3. and 4. block of nuclear power plant Mochovce

    International Nuclear Information System (INIS)

    Suchy, L.

    2006-01-01

    The contribution shows the basic information about the crucial milestone of 3. building and the current situation of the project of 3. and 4. block of the nuclear power plant Mochovce. Contribution also shows what activities were realized and what material in area of designation of the technical and safety standard of the project was elaborated in the past, the main activities planned for 2006 have been described, support for Feasibility Study elaborated by ENEL and description of the integrated management system. The basic thesis crucial for the next steps on the project of 3. and 4. block of Nuclear Power Plant Mochovce is presented in the conclusion

  8. Theoretical parameter histories of dynamic tests during power commissioning of Mochovce units power level up to 100 % Nnom

    International Nuclear Information System (INIS)

    Jagrik, J.; Mraz, M.; Rapant, M.; Stefanovic, P.; Kotasek, J.; Gieci, A.; Macko, J.; Mosny, J.

    1998-01-01

    Theoretical histories of selected parameters for dynamic tests carried out in the course of power commissioning of the Mochovce Unit 1 at the power level 100% N nom are shown in the report. The expected histories given were developed based on calculations performed by means of simulator in Nuclear Power Plants Research Institute Trnava, Inc., simulator in EGU Praha and simulator at the Mochovce plant, as well as based on similar tests at both Bohunice and Dukovany plants

  9. Human reliability analysis approach to level 1 PSA - shutdown and low power operation of Mochovce NPP, Unit 1, Slovakia

    International Nuclear Information System (INIS)

    Stojka, Tibor; Holy, Jaroslav

    2003-01-01

    The paper presents general approach, used methods and form of documentation of the results as have been applied within the Human Reliability Analysis (HRA) task of the shutdown and low power PSA (SPSA) study for Mochovce nuclear power plant, Unit 1, Slovakia. The paper describes main goals of the HRA task within the SPSA project, applied methods and data sources. Basic steps of the HRA task and human errors (HE) classification are also specified in its first part. The main part of the paper deals with pre-initiator human errors, human-induced initiators and response to initiator human errors. Since the expert judgment method (SLIM) was used for the last type of human errors probability assessment, also related activities are described including preparation works (performance shaping factors (PSFs) selection, development of PSF classification tables, preparation of aid tools for interview with plant experts), qualitative analysis (sources of information and basic steps) and quantitative analysis itself (human errors classification for final quantification including criteria used for the classification, description of structure of the spreadsheet used for quantification and treatment with dependencies). The last part of the paper describes form of documentation of the final results and provides some findings. (author)

  10. Chapter No.8. Personnel qualification and training

    International Nuclear Information System (INIS)

    2002-01-01

    The overall training system and the development projects of training the staff of all categories from NPP V-1, NPP V-2 Bohunice, SE-VYZ and NPP Mochovce were the subject of UJD's attention. During 2001 following inspections were carried out on nuclear personnel training: - PP's Bohunice: an inspection focused on compliance with requirements for staff qualifications and compliance with the prescribed training of Bohunice plant staff; - Mochovce NPP: an inspection focused on compliance with the requirements for staff qualifications and compliance with the prescribed training of NPP Mochovce staff; - SE-VYZ: an inspection focused on compliance with the requirements for staff qualifications and compliance with the prescribed training of SE-VYZ staff. Training the staff of the NPP's Bohunice: - The fundamental and periodical theoretical training as sure as the fundamental and periodical simulator training is carried out by the VUJE Training centre in Trnava. - The fundamental practical training in the workplace and training for the change work- rank is carried at Bohunice plant. Training of the staff of the NPP Mochovce: - The fundamental and periodical theoretical training is carried out by the VUJE Training centre in Trnava. The fundamental practical training in the workplace and training for the change work- rank as well as the fundamental and periodical simulator training is carried at Mochovce plant. Based on a successful passing of examination before the examining committee, UJD issues a certificate on special professional skills of selected staff members of nuclear installations for specific activity for the given type of nuclear installation and for the following positions: 1. Scientific shift manager for start up with the right of manipulation; 2. Shift supervisor; 3. Unit supervisor; 4. Primary circuit operator; 5. Secondary circuit operator; 6. Reactor physicist; 7. Scientific shift manager for start up without the right of manipulation. Examinations of

  11. Safety of nuclear power plants in Slovak Republic in the context of integration into the European Union

    International Nuclear Information System (INIS)

    Pillar, V.

    2001-01-01

    A review of the construction and operation of nuclear power plants in Slovak Republic which belong within Slovenske Elektrarne is made. Since 1993 with the applying of the Least Cost Planning Methods and Financial Feasibility Analysis the optimal variant, considering construction completion of the two units at Mochovce NPP, has been adopted and a project for safety enhancement has been implemented. Some changes have been made in siting project in order to meet the seismic requirements, following by change of the control system design and supplier. The most important result of the safety enhancement program, important not only for NPP Mochovce, but also for all NPPs of WWER 440/213 type, is the fact, that operability of containment with passive bubbler-condenser system for pressure suppression and its acceptability from safety point of view, has been fully confirmed. Results of safety enhancement program have been re-evaluated not only by International Atomic Energy Agency, but also by other international authorities and professional organisations with positive result. Especially significant is the conclusion of RISKAUDIT, which has carried out repeated evaluation of safety level of NPP Mochovce based on PHARE project and which is accepted by European Commission. A similar approach for enhancing the safety has been applied for the NPP V-1 units at Jaslovske Bohunice

  12. Slovenske elektrarne and the environment

    International Nuclear Information System (INIS)

    Mihaly, B.

    2003-01-01

    In this paper the environmental impact from Slovenske elektrarne is reviewed. The Mochovce Nuclear Power Plant has obtained as the first plant in the Slovak Republic - the International certificate in environmental management according the norm ISO 14001:1996 for production and supply of electric energy from NPP. The Certification was awarded by the certification company Det Norske Veritas Slovensko according to the Dutch accreditation the Raad voor Accredative. Mochovce NPP has obtained the Certificate after compliance of process requests and it is active for three years. After expiration of this period the certification process must be repeated

  13. Unit 1 and Unit 2 Nuclear Power Plant Mochovce construction finishing from primary contractor of technological part. Skoda Praha a. s. point of view

    International Nuclear Information System (INIS)

    Horky, F.

    2000-01-01

    In this paper the history of delivery of technological part for NPP V-1 Mochovce as well as of reconstruction and safety improvements by the Skoda Praha a.s. is presented. Primary contractor of technological part Skoda Praha together with its final suppliers proved ability to realize under hard conditions such a complicated work what was indisputedly Units 1 and 2 finishing. Company proved capability to conform itself flexibly in the course of work to requirements of customer for realization of safety measures which means that Units 1 and 2 fully satisfy international standards. By fulfilment of primary contractor of technology obligations and above all by takeover of complex responsibility for both Units putting in operation including responsibility for 'past' Skoda Praha put away one of basic problems which occurred in decision making to whom will be assigned construction finishing contract. These facts fully qualify Skoda Praha to be selected for possible Units 3 and 4 construction finishing as one of chief construction finishing participant

  14. Radiation exposure of the population from 222Rn and other natural radionuclides around Mochovce nuclear power plant, Slovakia

    International Nuclear Information System (INIS)

    Bulko, Martin; Holy, Karol; Mullerova, Monika; Bohm, Radoslav; Pohronska, Zofia; Hola, Olga

    2017-01-01

    In this article, the effective dose to the population from natural sources of ionizing radiation in the vicinity of Mochovce nuclear power plant in Slovakia is presented. All major contributions to the effective dose were taken into account, including the contributions from gamma radiation of soil and rocks, cosmic radiation, and indoor and outdoor radon and thoron. On the basis of recent indoor radon measurements in Slovak cities and publicly available data about radon concentration in the soil air, a roughly linear relationship was found between these variables. Consequently, the annual effective dose from indoor radon and thoron was conservatively estimated. For the area of interest, a map of conservatively estimated potential effective doses was created. For the villages in the vicinity of Mochovce, the conservatively estimated effective dose to the population from natural sources ranged from 5.4 to 14.6 mSv, which is four orders of magnitude higher than the contribution of radioactive discharges from Mochovce nuclear power plant. (authors)

  15. Transport structures and water reservoir for the Mochovce nuclear power plant

    International Nuclear Information System (INIS)

    Farkas, J.; Klacansky, T.

    1986-01-01

    The projects are described which were implemented by Doprastav Bratislava within the preparation of the site for the Mochovce nuclear power plant. This includes a railway siding in a length of 11.2 kilometres which includes a railway bridge, two other bridges and the reconstruction of the Kalna nad Vahom railway terminal. Also reconstructed or newly built were road communications in a total length of 23.3 km. The said project included the construction of a road flyover over the railway track and the construction of five other smaller bridges. In order to provide the utility water supply to the Mochovce nuclear power plant, a large reservoir is being built at Velke Kozmalovce. The reservoir will have a total capacity of 2.6 mill. m 3 of water, of this the effective capacity will be 2.1 mill. m 3 on a flooded area of some 90 ha. Part of the reservoir will be a small hydro-power plant, the reservoir will also be used for irrigation on the fields of the neighbouring farms. (Z.M.)

  16. Safety analyses of the electrical systems on VVER NPP

    International Nuclear Information System (INIS)

    Andel, J.

    2004-01-01

    Energoprojekt Praha has been the main entity responsible for the section on 'Electrical Systems' in the safety reports of the Temelin, Dukovany and Mochovce nuclear power plants. The section comprises 2 main chapters, viz. Offsite Power System (issues of electrical energy production in main generators and the link to the offsite transmission grid) and Onsite Power Systems (AC and DC auxiliary system, both normal and safety related). In the chapter on the off-site system, attention is paid to the analysis of transmission capacity of the 400 kV lines, analysis of transient stability, multiple fault analyses, and probabilistic analyses of the grid and NPP power system reliability. In the chapter on the on-site system, attention is paid to the power balances of the electrical sources and switchboards set for various operational and accident modes, checks of loading and function of service and backup sources, short circuit current calculations, analyses of electrical protections, and analyses of the function and sizing of emergency sources (DG sets and UPS systems). (P.A.)

  17. Chapter 9. Personnel qualification and training

    International Nuclear Information System (INIS)

    2000-01-01

    In 1999 the Nuclear Regulatory Authority of the Slovak Republic (UJD) focused on the overall training system and on developing programmes for individual categories for NPP V-1 Bohunice, NPP V-2 Bohunice, NPP Mochovce and SE-VYZ. The fundamental theoretical and periodical training for both Bohunice and Mochovce NPPs personnel, simulator training for NPP Bohunice, and periodical simulator training for Bohunice personnel is carried out by the VUJE Training center in Trnava, whereas the simulator training and periodical training for NPP Mochovce is carried at Mochovce plant. Based on a successful passing of examination before the examining committee, UJD issues, a certificate on special professional skills of selected staff of nuclear installations for specific activity for the given type of nuclear installation and for the following positions: (a)Shift manager for scientific start up with the right of manipulation; (b) Shift supervisor; (c) Unit supervisor; (d) Primary circuit operator; (e) Secondary circuit operator; (f) Reactor physicist; (g) Shift manager for scientific start up without the right of manipulation. Examination of selected personnel is described. Last year the examining committee held twelve session for oral theoretical examination. The number of licenses issued in 1999 and the total number of valid licenses is given.Conclusions from inspections carried out by UJD and inspections and tests carried out by the NPP operators in 1999, as well as results from operation and start up of nuclear units confirm that the standard of professional skills of the staff at nuclear installations a high standard of operational safety is being achieved on a permanent basis. Increasing the qualification of UJD staff was done in a form of training and courses scheduled in the plan of training for the staff for 1999. These training, composed of specialized qualification study, functional study, as well as study aimed at maintaining qualification. Training courses organized

  18. Evaluation of power commissioning of the Mochovce Unit 1 power level up to 100 % Nnom

    International Nuclear Information System (INIS)

    Sarvaic, I.; Mickolci, M.

    1998-01-01

    The document contains an evaluation of the power phase of power commissioning of the Mochovce Unit 1 in the phase up to the power level of 100 % N nom .In the document, the courses and results of tests in this phase of power commissioning are summarized, evaluation of the performance of important systems and equipment of the unit is carried out, and the compliance with Limits and Conditions in the course of the phase is assessed. On this basis, conclusions are drawn and recommendations for the unit to be ready for subsequent phases of the power commissioning. The evaluation was developed by the scientific management of the Mochovce commissioning providing an independent support for the operators for supervising the commissioning tasks from the point of nuclear safety

  19. Natural and artificial radioactivity in the area of the Mochovce regional radioactive waste store

    International Nuclear Information System (INIS)

    Bezak, J.; Daniel, J.; Moravek, J.

    2000-01-01

    The results of monitoring of natural and artificial radioactivity in the area of the Mochovce regional radioactive waste store before commission are presented. The concentrations of uranium, thorium, potassium, and cesium, as well as radon volume activity were measured

  20. Pavol Rusko brings up Mochovce again

    International Nuclear Information System (INIS)

    Janoska, J.

    2003-01-01

    Minister of Economy of the Slovak Republic Pavol Rusko would like to see the power plant in Mochovce finished. Press agency SITA quoted his statement that in case of privatisation of Slovenske elektrarne (SE), a.s., Bratislava investor should be searched that would be willing to complete the third and fourth blocks of the nuclear power plant. Last week a tender for sale of a 49-percent stake in SE was repeatedly launched when a privatisation advertisement was published in local and international press. Through a resolution announced last summer the cabinet allowed other companies to participate in the tender (as a reaction interest shown by Czech CEZ). CEZ would be interested in all areas of SE and not only in its conventional part as the other prospects. It is well possible that the number of prospects interested in nuclear energy may increase. Boss of SE, Miroslav Rapsik shares this view and last week announced that there would be probably at least two or three prospects that may be interested in SE as a whole. Amongst them some Russian companies. General Manager and Chairman of Board of Directors, Jaroslav Mil does not wasn't to speculate on under what conditions CEZ may agree with completing of Mochovce. He adds that building any source of nuclear power anywhere in Europe is very difficult without a clear support of wide political spectrum of the specific country. And he needs another assurance: that the cabinet would guarantee that it would eliminate all political pressure from side of the European Union.' In regards to a semi-finished source, according to J. Mil, it made a difference whether this was offered free or with all the fixed costs. 'First we have to see the figures,' he adds. Works on the third and fourth block were stopped in 1992 due to lack of funds. Based on the advise of privatisation advisor the semi-finished blocks were taken out of the privatisation. According to latest analysis the finalization would cost up to 43 billion Sk (1.04 billion

  1. Assessment of spent WWER-440 fuel performance under long-term storage conditions

    Energy Technology Data Exchange (ETDEWEB)

    Kupca, L [VUJE Inc. (Slovakia)

    2012-07-01

    In the Slovak Republic are under operation 6 units (4 in the Jaslovske Bohunice site, and 2 in the Mochovce), 2 units are under construction in Mochovce site. All units are WWER-440 type. The fresh fuel is imported from the Russian Federation. The spent fuel assemblies are stored in wet conditions in Bohunice Interim Storage Spent Fuel Facility (SFIS). By 15 July 2008, there were 8413 assemblies in SFIS. The objectives are: 1) Wet AR storage of spent fuel from the NPP Bohunice and Mochovce: Surveillance of conditions for spent fuel storage in the at-reactor (AR) storage pools of both NPP's (characteristics of pool water, corrosion product data); Visual control of storage pool components; Evaluation of storage conditions with respect to long-term stability (corrosion of fuel cladding, structural materials); 2) Wet SFIS storage at Bohunice: Measurement of spent fuel conditions during the long-term wet storage, activity data in the storage casks and amount of crud; Surveillance program for SFIS structural materials.

  2. Can Slovakia secure reliable electricity supply without nuclear?

    International Nuclear Information System (INIS)

    Pnacek, I.

    2004-01-01

    In this presentation author deals with structure of electricity production in the Slovak republic in 2006 and perspectives of electricity supply up to 2020 year. Decommissioning of Unit 1 and Unit 2 of the Bohunice NPP and completion of Unit 3 and 4 of the Mochovce NPP are discussed

  3. Start. Slovak power stations, Nuclear Power Plants Mochovce (Annual report 1998)

    International Nuclear Information System (INIS)

    1999-01-01

    A brief account of activities carried out by the Nuclear power plants Mochovce in 1998 is presented. These activities are reported under the headings: (1) Director's foreword; (2) Power plant management; (3) Highlights of 1998; (4) Quality system; (5) Electricity and heat generation; Maintenance; Capital construction; (6) Radiation safety; Environmental impacts of operations; (7) List of balances; Human resources; (8) International co-operation; Public relations

  4. National Report

    International Nuclear Information System (INIS)

    Lipar, M.

    2001-01-01

    Power production in Slovak Republic is presented. The safety at the NPPs Bohunice V-1, V-2 and Mochovce is discussed. The events - Automatic Reactor Scram at Bohunice 1 and Power Reduction - Home Load at Bohunice 2 due to short circuit in the external grid on 22 May 2001 and Manual Reactor Scram at Mochovce 2 NPP due to Loss of Offsite Power on 30 May 2001 are described

  5. Radiological characterisation of V1 NPP technological systems and buildings - Activation

    International Nuclear Information System (INIS)

    Kristofova, Kristina; Rapant, Tibor; Svitek, Jaroslav

    2012-01-01

    V1 NPP at Jaslovske Bohunice site has been finally shutdown after 28 years of successful operation in 2006 (Unit 1) and 2008 (Unit 2). At present, both units are finally shutdown and since July 2011 under decommissioning license. The preparation of V1 NPP decommissioning has been supported and partly financed by the Bohunice International Decommissioning Support Fund (BIDSF), under the administration of the European Bank for Reconstruction and Development. From 06/2008 to 12/2011 AMEC Nuclear Slovakia, together with partners STM Power and EWN GmbH, carried out BIDSF B6.4 project - Decommissioning database development (DDB). The main purpose of the B6.4 project was to develop a physical and radiological inventory database to support V1 NPP decommissioning process planning and performance. One of the specific deliverable tasks within the B6.4 project was deliverable D12 - Characterization of activated equipment and civil structures based on measurement, sampling and analyses performed on the samples. The scope of deliverable services within D12 task consisted of: 1. Categorization of activated components ; 2. Development of single working programs for their radiological monitoring and sampling ; 3. Preparation of sampling device and revision of all handling equipment; 4. Dose rate monitoring and sampling of: - Civil structures from reactors shaft on both units ; - Components placed in HLW storage, (so called 'Mogilnik') - connection rods, absorbers ; of control rod assemblies and neutron flux measurement channels ; - Reactor pressure vessel and shielding assemblies at both units of V1 NPP, reactor; internals from Unit 2 of V1 NPP; 5. Analysis of samples ; 6. Determination of radiological inventory ; 7. Import of radiological data for activated components into DDB. During sampling, mainly remotely controlled sampling device and radiation resistant camera with LED lightening for visual checking of all performed activities was used. In total, 125 samples have been taken

  6. Slovak power stations, Nuclear Power Plants Mochovce (Annual report 1997)

    International Nuclear Information System (INIS)

    1998-01-01

    A brief account of activities carried out by the Nuclear power plants Mochovce in 1997 is presented. These activities are reported under the headings: (1) Director's foreword; (2) Power plant management; (3) Highlights of 1997; (4) Capital construction; (5) Nuclear safety; (6) Radiation safety; (7) Work safety and health protection at work; (9) Fire protection; (10) Units upgrading - safety measures; (11) Maintenance; (12) Operation; (13) Environmental impacts of operations; (14) List of balances; (15) Human sources; (16) International co-operation; (17) Public relations

  7. Nuclear installations in Slovakia accords to the convention definition

    International Nuclear Information System (INIS)

    1998-01-01

    In this part the nuclear power plants Bohunice - Units V-1 and V-2 and NPP Mochovce (description of units, safety reports and safety improvement programs) are described. Description of Bohunice A-1, history and current status of the NPP A-1 and NPP decommissioning program are included. In next parts interim spent fuel storage, technologies of Raw processing and treatment, and treated and solid Raw storage sites are described

  8. SE-VYZ - Decommissioning of Nuclear Installations, Radioactive Waste and Spent Fuel Management

    International Nuclear Information System (INIS)

    Anon

    2004-01-01

    In this presentations processes of radioactive waste treatment in the Bohunice Radioactive Waste Processing Center (SE-VYZ), Jaslovske Bohunice are presented. Decommissioning of the A-1 NPP is also presented. Disposal of conditioned radioactive waste in fibre concrete containers (FCC) are transported to Mochovce from Jaslovske Bohunice by the transport truck where are reposited in the National radioactive waste repository Mochovce. The Interim spent fuel storage facility (ISFSF) is included into this presentation

  9. Nuclear safety. Improvement programme

    International Nuclear Information System (INIS)

    2000-01-01

    In this brochure the improvement programme of nuclear safety of the Mochovce NPP is presented in detail. In 1996, a 'Mochovce NPP Nuclear Safety Improvement Programme' was developed in the frame of unit 1 and 2 completion project. The programme has been compiled as a continuous one, with the aim to reach the highest possible safety level at the time of commissioning and to establish good preconditions for permanent safety improvement in future. Such an approach is in compliance with the world's trends of safety improvement, life-time extension, modernisation and nuclear station power increase. The basic document for development of the 'Programme' is the one titled 'Safety Issues and their Ranking for WWER 440/213 NPP' developed by a group of IAEA experts. The following organisations were selected for solution of the safety measures: EUCOM (Consortium of FRAMATOME, France, and SIEMENS, Germany); SKODA Prague, a.s.; ENERGOPROJEKT Prague, a.s. (EGP); Russian organisations associated in ATOMENERGOEXPORT; VUJE Trnava, a.s

  10. Final treatment of liquid radioactive wastes

    International Nuclear Information System (INIS)

    Svolik, S.

    2004-01-01

    Final treatment of liquid radioactive wastes which are produced by 1 st and 2 nd bloc of the Mochovce NPP, prepares the NPP in its natural range. The purpose of the equipment is liquidation of wastes, which are formed at production. Wastes are warehoused in the building of active auxiliary plants in the present time, where are reservoirs in which they are deposited. Because they are already feeling and in 2006 year they should be filled definitely, it is necessary to treat them in that manner, so as they may be liquidated. Therefore the Board of directors of the Slovenske elektrarne has disposed about construction of final treatment of liquid radioactive wastes in the Mochovce NPP. Because of transport the wastes have to be treated in the locality of power plant. Technically, the final treatment of the wastes will be interconnected with building of active operation by bridges. These bridges will transport the wastes for treatment into processing centre

  11. Increasing of leak-tightness of hermetic zone and other important components in NPPs

    International Nuclear Information System (INIS)

    Murani, J.

    2001-01-01

    The performed by VUEZ resealing works in the hermetic compartments/containment of WWER 440 and WWER 1000 NPPs in Slovakia (Jaslovske Bohunice V-1 NPP, Jaslovske Bohunice V-2 NPP, Mochovce NPP), the Czech Republic (Dukovany NPP, Temelin NPP) and Hungary (Pask NPP) are presented. The leakage rate from hermetic compartments at individual NPP reactor units are shown.The VUEZ activities in field of resealing of weld joints in pools and tanks in the Jaslovske Bohunice V-1 NPP and innovation of the seal of reactor pit protective hood (kolpak) are described. The principle of operation and practical experience of the SMU-V system implemented in the Jaslovske Bohunice V-1 NPP (WWER 440 - V 230) for NPP primary circuit leakage monitoring are also given

  12. Evaluation of doses during the handling and transport of radioactive wastes containers

    International Nuclear Information System (INIS)

    Kubik, I.; Kusovska, Z.; Hanusik, V.; Mrskova, A.; Kapisovsky, V.

    2000-01-01

    Radioactive waste products from the nuclear power plants (NPPs) must be isolated from contact with people for very long period of time. Low and intermediate-level waste will be disposed of in Slovakia in specially licensed Regional disposal facility which is located near the NPP Mochovce site. Radioactive waste accumulated in the Jaslovsk. Bohunice site, during the decommissioning process of the NPP A-1 and arising from the NPP V-1 and NPP V-2 operation, will be processed and shipped in standard concrete containers to the Mochovce Regional disposal facility. The treatment centre was build at the NPP Jaslovsk? Bohunice site which is in the trial operation now. It is supposed that radioactive waste containers will be transported by train from the treatment centre Jaslovsk? Bohunice to the site of Radioactive Waste Repository at Mochovce and by truck in the area of repository. To estimate the occupational radiation exposure during the transport the calculations of dose rates from the containers are necessary. The national regulations allow low level of radiation to emanate from the casks and containers. The maximum permissible volume radioactivity of wastes inside the container is limited in such a way that irradiation level should not exceed 2 mGy/h for the contact irradiation level and 0,1 mGy/h at 2-meter distance. MicroShield code was used to analyse shielding and assessing exposure from gamma radiation of containers to people. A radioactive source was conservatively modelled by homogenous mixture of radionuclides with concrete. Standard rectangular volume source and shield geometry is used in model calculations. The activities of the personnel during the transport and storage of containers are analysed and results of the evaluation of external dose rates and effective doses are described. (author)

  13. LESPRO - an expert system for the decision support in determination and suggestion of protective measures

    International Nuclear Information System (INIS)

    Bohunova, J.; Duranova, T.; Hatar, E.

    2000-01-01

    A prototype expert system for advising emergency procedures for nuclear regulatory authority has been developed. The expert system ESPRO is known as goal oriented rule-based knowledge system. The system is based on emergency procedures developed in VUJE Trnava, Inc. for use by the Emergency Response Centre (ERC) of the Slovak Nuclear Regulatory Authority (NRA). The operation interpretation module uses the knowledge base of emergency procedures for the evaluation of source term and determination and suggestion of protective measures which is represented in the form of a Petri net model. Its verification and validation was done on the basis of the results of two exercises: joint exercise of ERC staff with Slovak Army Headquarters and full scale Mochovce NPP emergency exercise with use of the Mochovce NPP simulator. (author)

  14. Future strategy of SE

    International Nuclear Information System (INIS)

    Arcelli, M.

    2006-01-01

    In this presentation author (General Director of Slovenske elektrarne, a. s.) presents structure and investment plans of SE. The feasibility study of construction of the blocks 3 and 4 of the Mochovce NPP is presented

  15. Activities of the Nuclear Regulatory Authority of the Slovak Republic and safety of nuclear facilities in the Slovak Republic in 1994

    International Nuclear Information System (INIS)

    1995-01-01

    The report summarizes activities of the Nuclear Regulatory Authority of the Slovak Republic (NRA SR) in 1994 and briefly presents results of the national expert supervision over nuclear safety facilities in the SR in 1994. In 1994, the NRA SR have performed a national supervision of following organizations: SE, a.s. - Jaslovske Bohunice Nuclear Power Plant (V-1 Nuclear Power Plant (V-1 NPP), V-2 Nuclear Power Plant (V-2 NPP), A-1 Nuclear Power Plant (A-1 NPP)); Mochovce Nuclear Power Plant; Radioactive waste repository, Mochovce); Organizations providing a specialized training of NPP personnel; Organizations providing specific deliveries and activities for the nuclear power industry; Organizations having an owner of nuclear materials; Organizations providing activities related to import of radioactive sources; Organizations using radioactive sources. Organization structure of the NRA SR is explained. In the presented Chapter 1 - Safety of nuclear power plants in the Slovak Republic - safety aspects of the Slovak NPPs are reported. The next activities are reported: nuclear materials and safeguards; radioactive waste; emergency planning and NRA SR's control and crisis centre; international activities to improve the national surveillance quality; other activities

  16. Part I. Chapter IV. Coldness is coming from Wienna

    International Nuclear Information System (INIS)

    Blaha, M.

    2008-01-01

    In this chapter author reviewed a political pressure of Austrian government and Austrian legislative assembly on Slovakia before fuel assembly insertion and commissioning of the Unit-1 of the Mochovce NPP. Mission of Walkdown II is described.

  17. Implementation of computer codes for performance assessment of the Republic repository of LLW/ILW Mochovce

    International Nuclear Information System (INIS)

    Hanusik, V.; Kopcani, I.; Gedeon, M.

    2000-01-01

    This paper describes selection and adaptation of computer codes required to assess the effects of radionuclide release from Mochovce Radioactive Waste Disposal Facility. The paper also demonstrates how these codes can be integrated into performance assessment methodology. The considered codes include DUST-MS for source term release, MODFLOW for ground-water flow and BS for transport through biosphere and dose assessment. (author)

  18. Advantages of viscodampers for NPPs upgrading

    International Nuclear Information System (INIS)

    Reinsch, K.H.; Schwahn, K.J.; Podrouzek, J.

    1993-01-01

    Viscodampers GERB are the ideal components for seismic upgrading of flexible pipework systems of the existing operating NPPs, of WWER-440 type, namely in primary reactor part. There are cheap, maintenance-free, simple and their installation minimizes the support forces to the structures. The quoted attests are enclosed in this paper. The references for application on Bohunice NPP upgrading are positive, and they are used in Mochovce and Temelin NPP as well

  19. Radiochemical speciation of strontium and cesium in soils and influence of the zeolite on its migration

    International Nuclear Information System (INIS)

    Cipakova, A.

    1998-01-01

    The dissertation deals with sorption and desorption characteristics of two significant radionuclides Sr-85 and Cs-137 in selected soil samples as well as from around of NPP Bohunice and NPP Mochovce which were examined. The dissertation consists from next chapters: (1) Introduction; (2) Present state of knowledge; (3) Materials and methods; (4) Results and discussion; (5) Conclusions; (6) Particular conclusions for the realisation in practice and for next development of the science

  20. Ejected control rod and rods drop measurements during Mochovce startup physical tests

    International Nuclear Information System (INIS)

    Minarcin, Miroslav; Elko, Marek

    1998-01-01

    Paper deals with measurements of asymmetric reactivity insertion into the reactor core that were carried out during physical startup tests of Mochovce Unit 1 in June 1998. Control rods worth measurements with one and two rods s tucked in upper limit and worth measurement of one control rod from group 6 'ejected' from the reactor core are discussed. During the experiments neutron flux was measured by four ionisation chambers (three of them were placed symmetrically around the reactor core). Results of measurements and influence of asymmetric reactivity influence on ionisation chambers response are presented in the paper. (Authors)

  1. Further experience in simulation of rod drop experiments in the Loviisa and Mochovce reactors

    International Nuclear Information System (INIS)

    Siltanen, P.; Kaloinen, E.; Tanskanen, A.; Mattila, R.

    2001-01-01

    Simulations of reactor scram experiments using the 3-dimensional kinetics code HEXTRAN have been updated for the initial cores of Loviisa-1 and 2 Mochovce-1 and have been extended to burned cores of Loviisa-1. In these simulations, the entire experiment is simulated dynamically, including the behaviour of the core, the signal of the ionization chamber, and the inverse point kinetics of the reactivity meter. The predicted output of the reactivity meter is compared with the output observed during the experiment (Authors)

  2. Radiation monitoring in the NPP environment, control of radioactivity in NPP-environment system

    International Nuclear Information System (INIS)

    Egorov, Yu.A.

    1987-01-01

    Problems of radiation monitoring and control of the NPP-environment system (NPPES) are considered. Radiation control system at the NPP and in the environment provides for the control of the NPP, considered as the source of radioactive releases in the environment and for the environmental radiation climate control. It is shown, that the radiation control of the NPP-environment system must be based on the ecological normalization principles of the NPP environmental impacts. Ecological normalization should be individual for the NPP region of each ecosystem. The necessity to organize and conduct radiation ecological monitoring in the NPP regions is pointed out. Radiation ecological monitoring will provide for both environmental current radiation control and information for mathematical models, used in the NPPES radiation control

  3. Technology for NPP decantate treatment realized at Kola NPP

    International Nuclear Information System (INIS)

    Stakhiv, Michael; Avezniyazov, Slava; Savkin, Alexander; Fedorov, Denis; Dmitriev, Sergei; Kornev, Vladimir

    2007-01-01

    At Moscow SIA 'Radon' jointly with JSC 'Alliance Gamma', the technology for NPP Decantate Treatment was developed, tested and realized at Kola NPP. This technology consists of dissolving the salt residue and subsequent treatment by ozonization, separation of the deposits formed from ozonization and selective cleaning by ferro-cyanide sorbents. The nonactive salt solution goes to an industrial waste disposal site or a repository specially developed at NPP sites for 'exempt waste' products by IAEA classification. This technology was realized at Kola NPP in December 2006 year. At this time more than 1000 m 3 of decantates log time stored are treated. It allows solving very old problem to empty decantates' tanks at NPPs in environmentally safe manner and with high volume reduction factor. (authors)

  4. Safety measures for NPP Mochovce - Skoda contribution

    International Nuclear Information System (INIS)

    Svec, P.

    1997-01-01

    Brief technical descriptions are given of the following issues involved in safety measures: reactor pressure vessel embrittlement and its monitoring; non-destructive testing; integrity of the steam generator primary collector; integrity of steam generator heat exchanging tubes; distribution of feedwater in the steam generator; the hazard of plugging water collectors located on the steam generator room floor; steam generator level control valves; primary circuit venting under emergency conditions; diagnostic systems installed in the primary circuit; monitoring of reactor pressure vessel head leaks; severity of containment leaks; turbine missiles; seismic design; procedures for normal operation; and operation limits and conditions. (M.D.)

  5. Advanced breaking technology on the Mochovce nuclear power plant building site

    International Nuclear Information System (INIS)

    Mraz, M.; Podel, R.; Vojta, A.

    1982-01-01

    Observing the given deadlines of the construction of the Mochovce nuclear power plant and the required volumes of breaking to the total value of 6.2 million m 3 of rock, the required output was derived for the 7th five year plan to the value of 200,000 m 3 per month, i.e., 10,000 m 3 per day and 700 m 3 per hour. The basic task is to build a flat building site with an area of 2,300 by 700 m 2 which requires the removal of a masiff of rocks rising to a height of 37 m, and by compacting the mined rock to build heaps to a height of 20 m. The rocks were disintegrated by blasting. Surface blasting was used for mining faces and ribs. POLONIT 2 or PERMON DAP 1 were mainly used for blasting (ammonium nitrate explosives). The Danubit 1 detonator was used in holes flooded with water. For drilling a combination was used of drilling machines HBM 70 Hausherr with a drilling diameter of 130 to 155 mm and Ingersol Rand ECM 350 with a drilling diameter of 80 mm. The compressors used are Atlas Copco XRHS 350 Dd and PTS 900 Dd. As the optimal combination of machines for the removal of disengaged material for the daily output of 15,000 m 3 the combination was used of 6 excavators with a shovel volume of 2.5 m 3 ORENSTEIN-KOPPEL RH 25 with 12 Kockum 445 trucks and 18 ORENSTEIN-KOPPEL RH 40 excavators with a shovel volume of 4 m 3 and a total of 64 Caterpillar 769 C, Belaz 548 A, Tatra T 200 and T 138 S1 trucks. The planned targets are being fulfilled and the work performed up to now on the Mochovce site equals 2.5 million m 3 of excavated and removed rock. (B.S.)

  6. Advanced breaking technology on the Mochovce nuclear power plant building site

    Energy Technology Data Exchange (ETDEWEB)

    Mraz, M; Podel, R; Vojta, A [Vyskumny Ustav Inzinierskych Stavieb, Bratislava (Czechoslovakia)

    1982-10-01

    Observing the given deadlines of the construction of the Mochovce nuclear power plant and the required volumes of breaking to the total value of 6.2 million m/sup 3/ of rock, the required output was derived for the 7th five year plan to the value of 200,000 m/sup 3/ per month, i.e., 10,000 m/sup 3/ per day and 700 m/sup 3/ per hour. The basic task is to build a flat building site with an area of 2,300 by 700 m/sup 2/ which requires the removal of a masiff of rocks rising to a height of 37 m, and by compacting the mined rock to build heaps to a height of 20 m. The rocks were disintegrated by blasting. Surface blasting was used for mining faces and ribs. POLONIT 2 or PERMON DAP 1 were mainly used for blasting (ammonium nitrate explosives). The Danubit 1 detonator was used in holes flooded with water. For drilling a combination was used of drilling machines HBM 70 Hausherr with a drilling diameter of 130 to 155 mm and Ingersol Rand ECM 350 with a drilling diameter of 80 mm. The compressors used are Atlas Copco XRHS 350 Dd and PTS 900 Dd. As the optimal combination of machines for the removal of disengaged material for the daily output of 15,000 m/sup 3/ the combination was used of 6 excavators with a shovel volume of 2.5 m/sup 3/ ORENSTEIN-KOPPEL RH 25 with 12 Kockum 445 trucks and 18 ORENSTEIN-KOPPEL RH 40 excavators with a shovel volume of 4 m/sup 3/ and a total of 64 Caterpillar 769 C, Belaz 548 A, Tatra T 200 and T 138 S1 trucks. The planned targets are being fulfilled and the work performed up to now on the Mochovce site equals 2.5 million m/sup 3/ of excavated and removed rock.

  7. Experience with drilling and blasting work during construction of Mochovce nuclear power plant

    International Nuclear Information System (INIS)

    Mraz, M.; Vojta, A.; Podel, R.

    1986-01-01

    The results are discussed of four years of investigating the technical and economic parameters of drilling and blasting equipment employed on the building site of the Mochovce nuclear power plant. The technical and operating characteristics are given of tested breaking and drilling sets manufactured by various foreign companies. The final choice was based on output, hard currency prices, power demand, operating reliability and number of personnel required for operation. The optimal set consists of two Hausherr HBM 70 drilling systems (holes with a diameter of 130 to 150 mm) and two ROC 601-02 Atlas Copco machines (auxiliary work, breaking foundation holes for nuclear reactors). (J.C.)

  8. Decommissioning of Brennilis NPP

    International Nuclear Information System (INIS)

    Baize, Jean-Marc

    1998-01-01

    This EDF press communique give information related to the decommissioning of the Brennilis NPP. The following five items are developed in this report: 1. the level-2 decommissioning operations at the Brennilis NPP; 2. the Brennilis NPP, a pilot operation from the commissioning up to the decommissioning; 3. history of the Brennilis NPP decommissioning; 4. the types of radioactive wastes generated by the Brennilis NPP decommissioning; 5. the Brennilis NPP - a yard management as a function of the wastes. The document contains also seven appendices addressing the following subjects: 1. the share of decommissioning assigned to EDF and the decommissioning steps; 2. the EDF installations in course of decommissioning; 3. the CEA decommissioned installations or in course of decommissioning; 4. regulations; 5. costs; 6. waste management - principles; 7. data on the decommissioning yard

  9. Mathematical Analysis of Malfunctions Caused by Seepage Water to the Republic Radioactive Waste Dump in Mochovce

    Directory of Open Access Journals (Sweden)

    Jozef Kuzma

    2007-01-01

    Full Text Available The storage of radioactive waste and the problem of assuring the low and medium radioactive waste is an actual interdisciplinary problem. An important factor influencing on a complex approach to solving these problems is also a creation of suitable technical conditions for its long-term storage. In this article we mathematically analyze an influence of the break covering and its effect on the long-term stability and reliable serviceability of the Republic radioactive waste dump in Mochovce.

  10. Decommissioning of NPP A-1

    International Nuclear Information System (INIS)

    Anon

    2009-01-01

    In this presentation the Operation history of A1 NPP, Project 'Decommissioning of A1 NPP' - I stage, Project 'Decommissioning of A1 NPP ' - II stage and Next stages of Project 'Decommissioning of A1 NPP ' are discussed.

  11. Slovak Electric, plc, Mochovce Nuclear Power Plant

    International Nuclear Information System (INIS)

    1999-01-01

    In this popular scientific brochure a brief description of construction scheme of Bohunice Nuclear Power Plant is presented. Electricity generation in a nuclear power plant is described. Instrumentation and control system as well as nuclear safety principles applied on the NPP are presented

  12. Two managerial grids in NPP

    International Nuclear Information System (INIS)

    Zhao Hui

    2012-01-01

    Today, the nuclear power corporation (NPC) enjoys the profit of LCEP (the low carbon economic policy). at the same time, they also enduring more and more pressure. For example, the partner competition or the NPP potential occupational risk . The efficient counterplot of risk is the self-ability cultivation. It is essential to research the NPP managerial flow. The nuclear power plant (NPP) unit is a carrier of the NPC enterprise management system, and has taken on a new look 'pull one portion then the whole moving'. The NPP has three systematical characters, the security responsibility center, the man-machine system and the input-output system. The manufacturing system and the enterprise management system are the great constituents of the NPP managerial flows. Means of systems analysis, we can find out the truth of the NPP running interface. In CHINA, there are many operating experiences near 20 years. It indicates that the NPP manufacturing system and the enterprise system are the roots of the nuclear power corporation, the core of the all NPP systems must be based on it. So the ability cultivation is the work core to NPP. It is reliably to ensure the NPP to be up against problems, for instance, the security duty, the costing control and the man-machine system running harmoniously. This paper introduces the NPP managerial flow and the present state of QNPC, also come up with a proposal to refer for the NPC development actions of collective measure, specialization, standardization, fine. (author)

  13. Part II. Chapter I. Nobody will build the nuclear power cheaper than we finish it under construction

    International Nuclear Information System (INIS)

    Bucha, T.

    2008-01-01

    This is an interview with Mr. Sergej Kozlik (vice-prime minister of the Slovak Government from October 11, 1993 up to March 15, 1994 and from December 12, 1994 up to October 30, 1998 and finance minister from December 13, 1994 up to January 14, 1998) who is remembering about financing of construction of the Mochovce NPP.

  14. Changing NPP consumption patterns in the Holocene: from Megafauna "liberated" NPP to "ecological bankruptcy"

    Science.gov (United States)

    Doughty, C.

    2015-12-01

    There have been vast changes in how net primary production (NPP) is consumed by humans and animals during the Holocene beginning with a potential increase in availability following the Pleistocene megafauna extinctions. This was followed by the development of agriculture which began to gradually restrict availability of NPP for wild animals. Finally, humans entered the industrial era using non-plant based energies to power societies. Here I ask the following questions about these three energy transitions: 1. How much NPP energy may have become available following the megafauna extinctions? 2. When did humans, through agriculture and domestic animals, consume more NPP than wild mammals in each country? 3. When did humans and wild mammals use more energy than was available in total NPP in each country? To answer this last question I calculate NPP consumed by wild animals, crops, livestock, and energy use (all converted to units of MJ) and compare this with the total potential NPP (also in MJ) for each country. We develop the term "ecological bankruptcy" to refer to the level of consumption where not all energy needs can be met by the country's NPP. Currently, 82 countries and a net population of 5.4 billion are in the state of ecologically bankruptcy, crossing this threshold at various times over the past 40 years. By contrast, only 52 countries with a net population of 1.2 billion remain ecologically solvent. Overall, the Holocene has seen remarkable changes in consumption patterns of NPP, passing through three distinct phases. Humans began in a world where there was 1.6-4.1% unclaimed NPP to consume. From 1700-1850, humans began to consume more than wild animals (globally averaged). At present, >82% of people live in countries where not even all available plant matter could satisfy our energy demands.

  15. NPOESS Preparatory Project (NPP) Science Overview

    Science.gov (United States)

    Butler, James J.

    2011-01-01

    NPP Instruments are: (1) well understood thanks to instrument comprehensive test, characterization and calibration programs. (2) Government team ready for October 25 launch followed by instrument activation and Intensive Calibration/Validation (ICV). NPP Data Products preliminary work includes: (1) JPSS Center for Satellite Applications and Research (STAR) team ready to support NPP ICV and operational data products. (2) NASA NPP science team ready to support NPP ICV and EOS data continuity.

  16. NPP life management (abstracts)

    International Nuclear Information System (INIS)

    Litvinskij, L.L.; Barbashev, S.V.

    2002-01-01

    Abstracts of the papers presented at the International conference of the Ukrainian Nuclear Society 'NPP Life Management'. The following problems are considered: modernization of the NPP; NPP life management; waste and spent nuclear fuel management; decommissioning issues; control systems (including radiation and ecological control systems); information and control systems; legal and regulatory framework. State nuclear regulatory control; PR in nuclear power; training of personnel; economics of nuclear power engineering

  17. SE-VYZ

    International Nuclear Information System (INIS)

    Anon

    2004-01-01

    On this CD compact disc 6 video-films (A-1 NPP; Bituminization; Cementation; Pressing; The Interim spent fuel storage facility; Transport into the National radioactive waste repository Mochovce; Ignition; and Vitrification). In these films process of radioactive waste treatment in the Bohunice Radioactive Waste Processing Center (SE-VYZ) is presented. 2 presentations about radioactive wastes treatment in the SE-VYZ are included

  18. Computerized information system of the Mochovce nuclear power plant

    International Nuclear Information System (INIS)

    Holik, V.

    1986-01-01

    The computer-based information system for the Mochovce nuclear power plant has a hierarchic structure which incorporates SM 1804 microcomputers and SM 1420 minicomputers. With regard to operation it is divided into two levels: the information system at the level of power plant units and the information system t the level of the whole power plant. The information system of a unit provides the collection of information on the technological equipment of each unit for the operative control of the unit and documentation on unit operation. Each unit has its own independent computer information system. The actual nucleus of each unit information system consists of two computer complexes based on SM 1420 twin computers, mutually substitutional. The power plant level information system provides the processing and output of information for personnel in the central control room of the power plant and for other managerial staff. It uses preprocessed information from the unit information systems and direct information from non-unit installations and from dosimetric control rooms of the power plant units. This information system is also based on a computer complex with two SM 1420 computers. (Z.M.)

  19. Slovenske elektrarne has fulfilled the plan of electric power production at 101 %

    International Nuclear Information System (INIS)

    Anon

    2004-01-01

    Slovenske elektrarne, a. s., produced in 2003 year the electric power in capacity 26,047.6 GWh, whereby they fulfilled business plan at 101 %. In compare with the last year it is a reduction in production by 1,397.3 GWh. The biggest share of production - till 68.6 % of overall production of the Slovenske elektrarne, was provided by nuclear sources. Nuclear power plants fulfilled business plan at 104 %, when Jaslovske Bohunice NPP has produced 11,625 GWh and Mochovce NPP 6,238 GWh. The share of other power plants on the electricity production is presented

  20. Review of selected contributions of the conference 'Integrated quality management systems in completion of units 3 and 4 Mochovce'

    International Nuclear Information System (INIS)

    2009-04-01

    There were 14 contributions presented of the conference focused on the integrated quality management systems in completion EMO34. Contributions were focused both on theoretical problems from the project management area and on the applications in practice in management systems implementation in accordance with the standards: STN EN ISO 9001:2000, STN EN ISO 14 001:2005, and OHSAS 18 001:1999 at the completion of the Nuclear Power Plant Mochovce of units 3 and 4

  1. Chapter No.5. Nuclear materials and physical protection of nuclear installations

    International Nuclear Information System (INIS)

    2002-01-01

    The State System of Accounting for and Control of Nuclear Material (SSAC) is based on requirements resulting from the Safeguards Agreement between the Government of the Slovak Republic and the IAEA. UJD performs this activity according to the 'Atomic Act' and relevant decree. The purpose of the SSAC is also to prevent unauthorised use of nuclear materials, to detect loses of nuclear materials and provide information that could lead to the recovery of missing material. The main part of nuclear materials under jurisdiction of the Slovak Republic is located at NPP Jaslovske Bohunice, NPP Mochovce and at interim storage in Jaslovske Bohunice. Even though that there are located more then 99% of nuclear materials in these nuclear facilities, there are not any significant problems with their accountancy and control due to very simply identification of accountancy units - fuel assemblies, and due to stability of legal subjects responsible for operation and for keeping of information continuity, which is necessary for fulfilling requirements of the Agreement. The nuclear material located outside nuclear facilities is a special category. There are 81 such subjects of different types and orientations on the territory of the Slovak Republic. These subjects use mainly depleted uranium as a shielding and small quantity of natural uranium, low enrichment uranium and thorium for experimental purposes and education. Frequent changes of these subjects, their transformations into the other subjects, extinction and very high fluctuation of employees causes loss of information about nuclear materials and creates problems with fulfilling requirements resulting from the Agreement. In 2001, the UJD carried out 51 inspections of nuclear materials, of which 31 inspections were performed at nuclear installations in co-operation with the IAEA inspectors. No discrepancies concerning the management of nuclear materials were found out during inspections and safeguards goals in year 2001 were

  2. Treatment and conditioning of solid and liquid raw

    International Nuclear Information System (INIS)

    Jakubec, R.

    2015-01-01

    Jadrova a vyradovacia spolocnost, a.s. (JAVYS) implements activities within the processes of treatment and conditioning of radioactive waste (RAW) at two nuclear facilities, one of them located in Bohunice - Technologies for treatment and conditioning of RAW. This nuclear facility includes: Bohunice RAW treatment centre, bituminization lines, waste water purification station and technologies for sorting, fragmentation and decontamination of metallic RAW. The Bohunice RAW treatment centre (BRTC) in Bohunice processes and conditions liquid and solid radioactive waste produced during the A1 NPP and V1 NPP decommissioning, waste from the operation of V2 NPP in Bohunice as well as from the operation of NPP EMO 1,2 in Mochovce. The BRTC includes the following technological facilities: sorting, high-pressure compaction, incineration, concentration and cementation. Treatment of radioactive wastes in the BRTC is described. (authors)

  3. VUJE Trnava, Inc. - Engineering, Design and Research Organisation

    International Nuclear Information System (INIS)

    2001-01-01

    This CD is multimedia presentation of programme safety upgrading of Bohunice V1 NPP. This chapter contains information about VUJE: It consists of next parts: (1) From VUJE history (1977-2001); (2) Human resources (Development of staff; Structure of employees 1999); (3) VUJE activities: (Diagnostics; Nuclear safety; Radiation safety; Commissioning and operation; Personnel training; Information technology; Electric grids; Conventional power); (4) Significant projects of VUJE are presented: Gradual reconstruction with safety upgrading of the V1 Bohunice nuclear power plant; Modernization of the V2 Bohunice NPP; Completion of the Republic Repository of Radioactive Wastes in Mochovce; Decommissioning of the A1 NPP Bohunice; Development of simulators; Physical and power commissioning of NPPs; Construction of high voltage line Varin - Sucany

  4. The V-1 NPP and V-2 NPP upgrading

    International Nuclear Information System (INIS)

    1998-01-01

    A brief account of activities in the V-1 NPP and V-2 NPP upgrading as well as maintenance carried out by the Nuclear power plants Jaslovske Bohunice in 1997 is presented. The V-1 NPP applied the so called 'Small Backfitting Programme'covering 81 points of the Czechoslovak Atomic energy Commission Decree No 5/91. Continual upgrading continued after the Backfitting Programme completion with the Safety Report and following Nuclear Regulatory Authority of Slovak Republic (NRA SR) Decrees No 1/94 and 110/94 setting spheres and procedure for adopting and implementation of measures enabling the units to operate further on. Results of expert missions, analyses and assessments of components identified by Basic Engineering became the basis for the development of the Gradual Reconstruction Programme. The Programme outputs underwent economic and probabilistic assessing their contribution to nuclear safety. This process resulted in finalizing the Gradual Reconstruction Programme which started to be implemented in 1996 and will be completed in 1999. It is implemented by the REKON consortium and covers 17 areas including Instrumentation and Control, self-consumption emergency supply, leakage monitoring, emergency core cooling system, seismic reinforcement and radioactivity localisation. Both units will reach internationally acceptable safety standards for the remaining life-time period. The V-2 NPP Upgrading and Safety Enhancement Programme includes results of activities performed in the course of last years to define all important activities leading to enhancement of nuclear safety and performance reliability and effectiveness within the plant life-time period and to establish conditions for extending the life-time of these units for 40 years. The V-2 NPP Upgrading and Safety Enhancement Programme aims to assure safe operation with a probability of the core damages less than 10 -4 /reactor · year

  5. Experience gained during commissioning and trial operation of Mochovce Nuclear Power Plant

    International Nuclear Information System (INIS)

    GaL, P.; Adamica, T.; Marosik, V.; Rehak, A.

    2000-01-01

    In this paper authors describe the experience gained during commissioning and trial operation of Mochovce NPP (EMO). The first year of EMO operation from the point of view of safety and reliability was successful. Evidently we were challenged with certain problems characteristic to this stage of operation which resulted in automatic reactor shutdown. There were 11 automatic shutdowns in 1998 by action of the quick emergency protection AO-1 and two manual shutdowns by the AO-1 key. In 1999, there were 6 automatic shutdowns by action of the quick emergency protection AO-1. Three of them was connected to the falsely activated binary signal of MCP switch of, in two cases the reason came out from the turbo-generator (TG) cooling water system. Very positive trend in the operation of both units shows the fact that during all commissioning period of the second unit there were only three automatic reactor shutdowns by the signal AO-1. All these actions were done in frame of commissioning tests. All causes which activated the automatic unit shutdowns were found out and rectified, the overall tuning of the cooling water system is on the process now. The solution of this problem is possible only power commissioning, and in the stage of the trial operation had no direct impacts on the nuclear, radiation, or technical safety respectively. In 1998 two events according to the INES scale after second unit commissioning because of two unit links of the cooling water system. The operational events during the commissioning tests, start-up tests, physical commissioning, were ranked the category 1 ('Action of SIS U040 p po <8,34 MPa at the system 2 and 3' and 'Breaching the L and C'). In 1999 only events occurred that were ranked in the category safety insignificant events and lower (category 0, or off the scale respectively). In the frame of the safety culture principles adopted, such as critical attitude, exact and careful approach, and communication, these problems were given the

  6. Hydrobiological survey of some surface waters in the area of Mochovce nuclear power plant and their saprobiological assessment

    International Nuclear Information System (INIS)

    Kovacik, L.

    1987-01-01

    The results are presented of a hydrobiological study of three flows and one retention reservoir in the surroundings of the Mochovce nuclear power plant (Western Slovakia) performed in June 1982 and May 1983. The research was aimed at obtaining necessary information on the species composition of the algal flora (include blue-green algae) and selected groups of invertebrate hydrofauna (Sarcodina, Rotatoria, Cladocera, Copepoda, Oligochaeta and Chironomidae) in this territory. Natural waters were classified on the basis of the species composition of water organisms according to saprobiological criteria. (author). 4 refs

  7. International Youth Nuclear Congress 2000. Film

    International Nuclear Information System (INIS)

    OST Film Production Studio; YDRNS Information Technology Services, Ltd.

    2001-01-01

    This CD-ROM contains 28 minutes 30 seconds of video-film about programme of International Youth Nuclear Congress 2000 (IYNC 2000). There is documentary video-film about IYNC 2000, also presented are: the Opening panel of the IYNC 2000, every day work of IYNC 2000, Congress people; the fun run; Entertainment excursion in Bratislava, about excursion in Mochovce NPP as well as in IAEA

  8. NPP Decommissioning: the concept; state of activities

    International Nuclear Information System (INIS)

    Nemytov, S.; Zimin, V.

    2001-01-01

    The main principles of NPP decommissioning concept in Russia are given. The conditions with fulfillment of works on NPP unit pre-decommissioning and decommissioning including: development of the normative documentation, creation of special fund for financing NPP decommissioning activities, deriving the Gosatomnadzor license for decommissioning of shut down NPP units, development of the equipment and technologies for waste and spent fuel management are presented. The decommissioning cost and labour intensity of one WWER-440 unit are shown. The practical works, executed on shut down units at Beloyarsk NPP (Unit1 and 2) and Novo Voronezh NPP (Unit 1 and 2) are outlined

  9. Regulatory Aspect of Periodic Safety Review Performed in Nuclear Power Plants in the Slovak Republic

    International Nuclear Information System (INIS)

    Baszo, Z.

    2010-01-01

    The paper deals with the regulatory aspect of Nuclear Power Plant (NPP) Periodic Safety Review (PSR) as a part of license renewal process in the Slovak Republic. It summarizes the history of activities similar to PSR performed in the past for NPPs operated in the Slovak Republic. Furthermore, it describes both the requirements involved in the current Slovak legislation to be met by licensee in the Slovak Republic in this field and the procedures concerning the PSR as well. The objective and rules of PSR to be performed for NPPs in the Slovak Republic were derived from the internationally accepted International Atomic Energy Agency (IAEA) document and have been implemented into national legislation. PSR of two twin units located in Bohunice NPP and Mochovce NPP, respectively, has been initiated in the Slovak Republic based on evaluation of each area to be reviewed (safety factors) using recent methodology and practice. Other significant factors, such as ageing, modifications of NPP and the safe operation for a specified future period, have to be assessed in the frame of PSR. Report on performed PSR outlines the results of review for each area, the corrective plan, which considering mutual relations between assessed areas specifies the issues to be solved with the aim to eliminate shortcomings identified in the frame of PSR and to adopt safety improvements. The findings from PSR in the evaluated areas also serve as a source of information for updating of all documents to be attached to the written application of licensee for renewal of a nuclear power plant operating license. The presented procedure describes how the Nuclear Regulatory Authority of the Slovak Republic (UJD SR) has reviewed the documents submitted during PSR. Based on results of submitted documents evaluation and licensee application for license renewal the license for next 10 years operation has been issued for Bohunice NPP. At present, similar procedure for Mochovce NPP unit 1 and 2 is underway.(author).

  10. NPP service life management

    International Nuclear Information System (INIS)

    Elagin, Yu.P.

    2001-01-01

    Problems of NPP service life management and service life prolongation are reviewed. Methods for the prolongation of the French NPP service life are discussed, priority directions of nuclear block service life management in regard to aging in the context of the European program of investigation into the materials aging are identified. Questions of the provision of the 60 years service life of the Mihama 1 block (Japan) and decision of the problem of the control equipment aging in Great Britain are discussed. Situation with the prolongation of licenses on the NPP operation in the USA and Spain is considered [ru

  11. Results of physics start-up tests of Mochovce and Bohunice units with 2-nd generation Gd fuel (average enrichment 4.87 %)

    International Nuclear Information System (INIS)

    Polakovic, F.

    2015-01-01

    There are presented main features of the fuel and the list of experimental neutron-physical characteristics measured during physics start-up tests.All together there were carried out 14 physics start-ups at Bohunice and Mochovce Units with the new type of fuel. Differences between theoretical and experimental neutron-physical characteristics were statistically processed and compared with the tests acceptance criteria. There are summarized results of reactor physics start-ups with 2-nd generation Gd fuel usage [ru

  12. Modernization programme at Dukovany NPP

    International Nuclear Information System (INIS)

    Trnka, M.

    2000-01-01

    The main goal of each NPP is to produce electricity safely, economically and without influence to environment. For Dukovany NPP it means to upgrade all documentation and perform the Equipment Upgrading Programme. All these activities are time and money consuming and therefore the determination of priority of all items was necessary. In the presentation there are mentioned some important changes in documentation, results of PSA studies and reason for Equipment Upgrading Programme performance. It was selected the most important item from the list of Equipment Upgrading Programme the I and C upgrading. Management has decided that Dukovany NPP will become among the best NPPs with WWER type of reactor. It seems this decision is the best way how to extend lifetime of the NPP. (author)

  13. Emergency preparedness at Ignalina NPP

    International Nuclear Information System (INIS)

    Kairys, A.

    1998-01-01

    Brief review of Ignalina NPP safety upgrading and personnel preparedness to act in cases of accidents is presented. Though great activities are performed in enhancing the plant operation safety, the Ignalina NPP management pays a lot of attention to preparedness for emergency elimination and take measures to stop emergency spreading. A new Ignalina NPP emergency preparedness plan was drawn up and became operational. It is the main document to carry out organizational, technical, medical, evacuation and other activities to protect plant personnel, population, the plant and the environment from accident consequences. Great assistance was rendered by Swedish experts in drawing this new emergency preparedness plan. The plan consists of 3 parts: general part, operative part and appendixes. The plan is applied to the Ignalina NPP personnel, Special and Fire Brigade and also to other contractor organizations personnel carrying out works at Ignalina NPP. There are set the following emergency classes: incident, emergency situation, alert, local emergency, general emergency. Separate intervention level corresponds to each emergency class. Overview of personnel training to act in case of an emergency is also presented

  14. PRIMAVERA - the experience of the utilization at the completion MO34

    International Nuclear Information System (INIS)

    Porubsky, S.

    2009-01-01

    Today, it is not possible to provide the required quality of neither the process nor the project's outputs without suitable software management support. It is necessary to remember, that the software management support of the big projects is necessary, not just sufficient condition for successful implementation of the project. The following contribution describes the experience with the software support setting for completion project of units 3. and 4. of NPP Mochovce

  15. Does climate directly influence NPP globally?

    Science.gov (United States)

    Chu, Chengjin; Bartlett, Megan; Wang, Youshi; He, Fangliang; Weiner, Jacob; Chave, Jérôme; Sack, Lawren

    2016-01-01

    The need for rigorous analyses of climate impacts has never been more crucial. Current textbooks state that climate directly influences ecosystem annual net primary productivity (NPP), emphasizing the urgent need to monitor the impacts of climate change. A recent paper challenged this consensus, arguing, based on an analysis of NPP for 1247 woody plant communities across global climate gradients, that temperature and precipitation have negligible direct effects on NPP and only perhaps have indirect effects by constraining total stand biomass (Mtot ) and stand age (a). The authors of that study concluded that the length of the growing season (lgs ) might have a minor influence on NPP, an effect they considered not to be directly related to climate. In this article, we describe flaws that affected that study's conclusions and present novel analyses to disentangle the effects of stand variables and climate in determining NPP. We re-analyzed the same database to partition the direct and indirect effects of climate on NPP, using three approaches: maximum-likelihood model selection, independent-effects analysis, and structural equation modeling. These new analyses showed that about half of the global variation in NPP could be explained by Mtot combined with climate variables and supported strong and direct influences of climate independently of Mtot , both for NPP and for net biomass change averaged across the known lifetime of the stands (ABC = average biomass change). We show that lgs is an important climate variable, intrinsically correlated with, and contributing to mean annual temperature and precipitation (Tann and Pann ), all important climatic drivers of NPP. Our analyses provide guidance for statistical and mechanistic analyses of climate drivers of ecosystem processes for predictive modeling and provide novel evidence supporting the strong, direct role of climate in determining vegetation productivity at the global scale. © 2015 John Wiley & Sons Ltd.

  16. New approach of second Romanian NPP siting

    International Nuclear Information System (INIS)

    Mauna, Traian

    2010-01-01

    The NPP sitting studies in Romania began before 1975. The first Romanian NPP CANDU 6 type reactor gone to erection in 1980 on Cernavoda site planned to have 5 units. Gained the experience from Cernavoda NPP sitting, the first mission of new multi-branch of specialists team was to choose new NPP sites adapting the NPP Cernavoda project to the new parameters of close water cooling circuit and hard less and no rock foundation strata. The studies were carrying out in different stages on the inner rivers Olt, Mures, Somes in Transylvania historical region. This paper tries to reconsider shortly the old analysis according to the last IAEA Safety Standards, taking into account the new NPP generation requirement. Paper is focused on geological aspects and other local sites characteristics. (authors)

  17. Ignalina NPP: living and working conditions

    International Nuclear Information System (INIS)

    Chiuzhas, A.

    1998-01-01

    The conference was devoted to discuss the social problems related with the operation of Ignalina NPP. The main topics are the following: analysis of public opinion of surrounding region of Ignalina NPP including neighbouring Daugavpils district in Latvia, environment impact evaluation of Daugavpils district, assessment of the influence of Ignalina NPP operation to the development of business in the region, investigation of problems of Visaginas town - residence of Ignalina NPP personnel. The specificity of Visaginas (former Sniechkus) is defined by the majority of non-native Lithuanians living there. Cultural transformation and political organization of the region were surveyed as well

  18. Spain in South Ukraine NPP

    International Nuclear Information System (INIS)

    Ibanez, M.

    1994-01-01

    A Technical Assistance Protocol was signed between the Governments of the GIS and the Commission of the European Union (CEU) on August 2, 1991 and this was the starting point of the TACIS program. In this article, the activities described are those related to the TACIS-92/93/94 on site technical assistance to South Ukraine NPP (SUK NPP). Within the scope of the TACIS 92 Program the CEU and the Ukrainian Authorities agreed a list of projects to be implemented at South Ukraine NPP with the aim to improve the operational safety of the plant. This part of the program is called TACIS 92 on-site activities. The total budget allocated to these projects is a MECU. The European Union ''utility'' selected to lead this program at South Ukraine NPP was UNESA and the first contract to cover our activities was signed in July 1993 between the CEU (Mr. Pablo Benavides) and UNESA (Mr. Pedro Rivero). The projects will be implemented at SUK NPP but according to the contract UNESA is ''The Consultant'' and GOSKOMATON (The Ukrainian Sate Committee on Nuclear Power Utilization) is the ''Recipient Institution''. (Author)

  19. Selection of NPP for Kazakhstan

    International Nuclear Information System (INIS)

    Zhotabaev, Zh.R.

    2003-01-01

    Commercial NPP for Kazakhstan should to meet to several main requirements: 1). Safety operation (accident probability not more than 10 -6 1/p. year). 2). High efficiency > 40 %. 3). Possibility of use for high-temperature chemistry and hydrogen production. 4). Possibility for manufacturing of considerable part of equipment in Kazakhstan. 5). Possibility for fuel production and reprocessing in Kazakhstan. 6). Independence from existence of large water-supply sources. Comparative analysis of several NPP with different reactors (WWR-1000, Candu, BREST, VG-400; graphite molten salt reactor) shows that NPP with the graphite molten salt reactor meets to all above requirements, but hydrogen production it is possible by more complete 4-stage technology, since coolant temperature is 800 Deg. C. The principle advantage is possibility of manufacturing of main equipment and fuel in Kazakhstan that reduce the cost of NPP construction and operation

  20. Activities of Nuclear Regulatory Authority and safety of nuclear facilities in the Slovak Republic in 1993

    International Nuclear Information System (INIS)

    1994-04-01

    A brief account of activities carried out by the Nuclear Regulatory Authority of the Slovak Republic (NRA SR) in 1993 is presented. These activities are reported under the headings: (1) Introduction; (2) Regulatory activities at nuclear power plants units in operation; (2.1) Nuclear power plant SEP-EBO V-1; (4) Selected operation events and safety assessment in NPP SEP-EBO V-1; (2.2) Safety assessment of NPP SEP-EBO V-2; (3) Results of regulatory activities at the decommissioning of NPP A-1; (4) Regulatory activities at units under construction SEP-EMO - NPP Mochovce; (5) Further regulatory activities. (5.1) Preparation of designated personnel; (5.2) Inspection and accountancy of nuclear material; (5.3) Security provisions; (5.4) Accounted items and double use items; (5.5) Problem of radioactive wastes; (6.1) International co-operation activities of NRA; (6.2) Emergency planning; (6.3) International activities for quality enhancement of national supervision; (7) Conclusion [sk

  1. Behaviour of Aluminosilicate Inorganic Matrix Sial During and After Solidification of Radioactive Sludge And Radioactive Spent Resins and Their Mixtures

    International Nuclear Information System (INIS)

    Lichvar, P.; Rozloznik, M.; Sekely, S.

    2013-01-01

    SIAL matrix is the product of inorganic compounds by polycondensation. The inorganic SIAL matrix was subject of study from the atomic level to the level of technological application. Infrared spectroscopy measurement and X-ray analysis confirmed that SIAL matrix is mostly formed by amorphous phase. This satisfies the required criteria for disposal of immobilized radioactive waste of appropriate properties into surface repository (Slovak and Czech Republic). First of all, leaching of radioactive nuclide Cs-137 and compressive strength of the final product were found. Various remotely operated devices have been designed, manufactured and successfully used for the radioactive sludge and sludge/resins mixture solidification at the Nuclear power plant (NPP) A-1, V-2 in Jaslovske Bohunice, at Mochovce NPP (Slovak Republic), at Dukovany NPP and at Temelin NPP (Czech Republic). The SIAL matrix was approved for waste package for sludge/resins mixture by the Slovak and Czech Nuclear Regulatory Authorities. (author)

  2. Behaviour of Aluminosilicate Inorganic Matrix Sial During and After Solidification of Radioactive Sludge And Radioactive Spent Resins and Their Mixtures

    Energy Technology Data Exchange (ETDEWEB)

    Lichvar, P.; Rozloznik, M.; Sekely, S. [Amec Nuclear Slovakia, 919 31 Jaslovske Bohunice (Slovakia)

    2013-09-15

    SIAL matrix is the product of inorganic compounds by polycondensation. The inorganic SIAL matrix was subject of study from the atomic level to the level of technological application. Infrared spectroscopy measurement and X-ray analysis confirmed that SIAL matrix is mostly formed by amorphous phase. This satisfies the required criteria for disposal of immobilized radioactive waste of appropriate properties into surface repository (Slovak and Czech Republic). First of all, leaching of radioactive nuclide Cs-137 and compressive strength of the final product were found. Various remotely operated devices have been designed, manufactured and successfully used for the radioactive sludge and sludge/resins mixture solidification at the Nuclear power plant (NPP) A-1, V-2 in Jaslovske Bohunice, at Mochovce NPP (Slovak Republic), at Dukovany NPP and at Temelin NPP (Czech Republic). The SIAL matrix was approved for waste package for sludge/resins mixture by the Slovak and Czech Nuclear Regulatory Authorities. (author)

  3. There's no Nuclear Future without the Young

    International Nuclear Information System (INIS)

    Petrech, R.; Holy, R.

    2002-01-01

    Construction of Mochovce NPP started in 1981 - i.e. more than 20 years ago, however it was halted in early 90's after velvet Revolution in former Czechoslovakia. When the (I and C) system was decided in 1989 to be replaced with a state-of-the-art system of Siemens, and it was implemented in early 1990-1, the utility lacked money for further works and building works had to be halted. We were consequently thrown in difficult public and expert debates about the nuclear future: do we really need it? Nuclear is looking for new ways to persuade the public about the need to keep nuclear as a part of the world energy mix. For experts it is clear. It has already been indicated in the Green Book - a report about the future electricity demand coverage by diverse sources made out for the EC. The role of the young people is indispensable in this process. Information campaigns are focused mostly on youngsters from the very young age whose opinions are being formed. Only a long-lasting systematic work with the youth can bring better public opinion. About 95 % of Mochovce NPP visitors are students (mostly primary and secondary schools) - that is important.(author)

  4. A brief overview of Ignalina NPP safety issues

    International Nuclear Information System (INIS)

    Almenas, K.; Ushpuras, E.

    1998-01-01

    A description of the safety of Ignalina NPP in a very popular form is presented. Answers to the most frequently recurring questions concerning the Ignalina NPP are provided based on recently completed international studies. Questions are like these: can a similar accident to the one that occurred in Chernobyl take place at Ignalina NPP, does the Ignalina NPP have a containment, what are the probabilities and potential consequences of accidents, etc. The brochure contains a short description of Ignalina NPP safety improvement programs

  5. NPP Krsko decommissioning concept

    International Nuclear Information System (INIS)

    Novsak, M.; Fink, K.; Spiler, J.

    1996-01-01

    At the end of the operational lifetime of a nuclear power plant (NPP) it is necessary to take measures for the decommissioning as stated in different international regulations and also in the national Slovenian law. Based on these requirements Slovenian authorities requested the development of a site specific decommissioning plan for the NPP Krsko. In September 1995, the Nuklearna Elektrarna Krsko (NEK) developed a site specific scope and content for a decommissioning plan including the assumptions for determination of the decommissioning costs. The NEK Decommissioning Plan contains sufficient information to fulfill the decommissioning requirements identified by NRC, IAEA and OECD - NEA regulations. In this paper the activities and results of development of NEK Decommissioning Plan consisting of the development of three decommissioning strategies for the NPP Krsko and selection of the most suitable strategy based on site specific, social, technical, radiological and economic aspects, cost estimates for the strategies including the costs for construction of final disposal facilities for fuel/high level waste (fuel/HLW) and low/intermediate level waste (LLW/ILW) and scheduling of all activities necessary for the decommissioning of the NPP Krsko are presented. (author)

  6. NPP Krsko decommissioning concept

    International Nuclear Information System (INIS)

    Novsak, M.; Fink, K.; Spiler, J.

    1996-01-01

    At the end of the operational lifetime of a nuclear power plant (NPP) it is necessary to take measures for the decommissioning as stated in different international regulations and also in the national Slovenian law. Based on these requirements Slovenian authorities requested the development of a site specific decommissioning plan for the NPP KRSKO. In September 1995, the Nuklearna Elektrarna Krsko (NEK) developed a site specific scope and content for decommissioning plan including the assumptions for determination of the decommissioning costs. The NEK Decommissioning Plan contains sufficient information to fulfill decommissioning requirements identified by NRC, IAEA and OECD - NEA regulations. In this paper the activities and the results of development of NEK Decommissioning Plan consisting of the development of three decommissioning strategies for the NPP Krsko and selection of the most suitable strategy based on site specific, social, technical, radiological and economical aspects, cost estimates for the strategies including the costs for construction of final disposal facilities for fuel/high level waste (fuel/HLW) and low/intermediate level waste (LLW/ILW) and scheduling all activities necessary for the decommissioning of the NPP KRSKO are presented. (author)

  7. Investigation and analysis of SSI effects in seismic response of NPPs EMO and EBO

    International Nuclear Information System (INIS)

    Juhasova, E.

    1996-01-01

    This progress report outlines and describes the analysis and investigations of soil-structure interaction effects in seismic response of Bohunice and Mochovce nuclear power plants. The work carries out consists of theoretical-numerical analysis of soil-structure interaction and the description of the experimental results obtained so far. Investigations were performed for different soil conditions and recommendations were elaborated as to prepare and use long-term monitoring of vibration activity at the Bohunice NPP site

  8. Radwaste Treatment Centre Jaslovske Bohunice

    International Nuclear Information System (INIS)

    2000-01-01

    In this leaflet the Bohunice Radwaste Treatment Centre (BSC RAO) is presented. BSC RAO is designed to process and treat liquid and solid radwaste, arising from the NPP A-1 decommissioning, from NPPs V-1, V-2, and Mochovce operations, as well as institutional radwaste of diverse institutional (hospitals, research institutes) in the Slovak Republic. Transport, sorting, incineration, compacting, concentration and cementation of radwaste as well as monitoring of emission are described

  9. Operation Aspect of the Main Control Room of NPP

    International Nuclear Information System (INIS)

    Sahala M Lumbanraja

    2009-01-01

    The main control room of Nuclear Power Plant (NPP) is operational centre to control all of the operation activity of NPP. NPP must be operated carefully and safely. Many aspect that contributed to operation of NPP, such as man power whose operated, technology type used, ergonomic of main control room, operational management, etc. The disturbances of communication in control room must be anticipated so the high availability of NPP can be achieved. The ergonomic of the NPP control room that will be used in Indonesia must be designed suitable to anthropometric of Indonesia society. (author)

  10. Proceedings of the 9th NUSIM 2000 Conference. Joint Slovak, Czech and German Seminar on Nuclear Power

    International Nuclear Information System (INIS)

    2000-01-01

    Scientific conference deals with problems of reactor safety upgrading, mainly of two blocks of the NPP V-1 Bohunice as well as decomissioning of the NPP A-1 Bohunice. Other problems of the nuclear engineering were discussed. Totally, 201 participants from the Slovak Republic, Czech Republic and Germany and from other countries took part in the conference. The Conference included the following sessions: (i): Survey on the situation of nuclear power in the partner countries; (ii) Mochovce design safety enhacement and operational experience; (iii) Bohunice V-1 safety upgrading and operational experience; (iv) Decomissioning, spent fuel and radwaste management; (v) Young Generation Presentation. Proceedings contains thirty one papers dealing with the scope of INIS

  11. Radiation ecological monitoring in NPP region

    International Nuclear Information System (INIS)

    Egorov, Yu.A.; Kazakov, S.V.

    1985-01-01

    The known principle of sanitary-hygienic regulation of NPP radiation effect on man and environment is analyzed. An ecological approach is required to optimize NPP relations with the environment and to regulate radioactivity of the NPP - environment system. The ecological approach envisages the development of standards of permissible concentrations of radioactive and chemical substances (as well as heat) in natural environment, taking into account their synergism, corresponding to ecologically permissible response reactions of biota to their effect. The ecological approach also comprises the sanitary-hygienic principle of radiation protection of man. Attention is paid to ecological monitoring in NPP region, comprising consideration of factors, affecting the environment, evaluation of the actual state of the environment, prediction of the environmental state, evaluation of the expected environmental state

  12. Environmental impact of the NPP Krsko

    International Nuclear Information System (INIS)

    Novosel, N.

    1996-01-01

    The Ministry of Economic Affairs has for six years now been monitoring the operation of the Krsko NPP (NEK) and its impact on the environment. A bulletin titled 'NEK - Energy and Environment' is being issued every three months. It contains information on operation of the Krsko NPP for the previous three months, a graph of duration of temperature increase of water in the Sava river (delta T) in that period, an assessment of the radiological impact of Krsko NPP on the environment through an equivalent dose cumulatively throughout the calendar year, and a short current text related to Krsko NPP. The Ministry of Economic Affairs organizes a press conference on every issue of the bulletin, as an attempt of introducing this subject to the media and to the public. This paper contains a review of information given in the NEK bulletin from 1990 to 1995 with a special emphasis on the contribution of the Krsko NPP to the artificially caused radiation on the border between the Republic of croatia and the Republic of Slovenia. (author)

  13. NPP Prevlaka - Preparation of construction

    International Nuclear Information System (INIS)

    Bojic, K.

    1984-01-01

    On the basis of study 'Optimal electricity generation structure till the year 2000' production of 3 x 500 MWe in nuclear power plants has been anticipated. Second Croatian-Slovenian NPP project will be based on the same principles the first one (NPP Krsko) was based on. Preconstruction investigation studies are performed at site Prevlaka on river Sava downstream of Zagreb. Licensing procedure has started with republic Urban countryside planning activities. Preconstruction activities are planned to be finished by the end of 1986. while the construction is expected to start during 1987. Parallel to investigation studies for NPP Prevlaka, evaluation of nuclear technology and reactor type is planned to be made. (author)

  14. Chapter No.4. Safety analyses

    International Nuclear Information System (INIS)

    2002-01-01

    In 2001 the activity in the field of safety analyses was focused on verification of the safety analyses reports for NPP V-2 Bohunice and NPP Mochovce concerning the new profiled fuel and probabilistic safety assessment study for NPP Mochovce. The calculation safety analyses were performed and expert reviews for the internal UJD needs were elaborated. An important part of work was performed also in solving of scientific and technical tasks appointed within bilateral projects of co-operation between UJD and its international partnership organisations as well as within international projects ordered and financed by the European Commission. All these activities served as an independent support for UJD in its deterministic and probabilistic safety assessment of nuclear installations. A special attention was paid to a review of probabilistic safety assessment study of level 1 for NPP Mochovce. The probabilistic safety analysis of NPP related to the full power operation was elaborated in the study and a contribution of the technical and operational improvements to the risk decreasing was quantified. A core damage frequency of the reactor was calculated and the dominant initiating events and accident sequences with the major contribution to the risk were determined. The target of the review was to determine the acceptance of the sources of input information, assumptions, models, data, analyses and obtained results, so that the probabilistic model could give a real picture of the NPP. The review of the study was performed in co-operation of UJD with the IAEA (IPSART mission) as well as with other external organisations, which were not involved in the elaboration of the reviewed document and probabilistic model of NPP. The review was made in accordance with the IAEA guidelines and methodical documents of UJD and US NRC. In the field of calculation safety analyses the UJD activity was focused on the analysis of an operational event, analyses of the selected accident scenarios

  15. Seismic characterization of the NPP Krsko site

    International Nuclear Information System (INIS)

    Obreza, J.

    2000-01-01

    The goal of NPP Krsko PSA Project Update was the inclusion of plant changes (i.e. configuration/operational related) through the period January 1, 1993 till the OUTAGE99 (April 1999) into the integrated Internal/External Level 1/Level 2 NPP Krsko PSA RISK SPECTRUM model. NPP Krsko is located on seismotectonic plate. Highest earthquake was recorded in 1917 with magnitude 5.8 at a distance of 7-9 km. Site (founded) on Pliocene sediments which are as deep as several hundred meters. No surface faulting at the Krsko site has been observed and thus it is not to be expected. NPP Krsko is equipped with seismic instrumentation, which allows it to complete OBE (SSE). The seismic PSA successfully showed high seismic margin at Krsko plant. NPP Krsko seismic design is based on US regulations and standards

  16. Some problems of NPP personnel training

    International Nuclear Information System (INIS)

    Vajshnis, P.P.; Kumkov, L.P.; Omel'chuk, V.V.

    1984-01-01

    Shortcomings of NPP personnel training are discussed. Development of full-scale training systems is necessary for qualitative training operative personnel. Primary problems that should be necessarily solved for ensuring effective training NPP personnel are considered

  17. Current situation of the project finishing of the building of 3 and 4 block of the nuclear power plant Mochovce

    International Nuclear Information System (INIS)

    Niznan, S.

    2005-01-01

    In the contribution there is the basic information mentioned about history of building and the current situation at the finishing of the building of 3 and 4 block of the Nuclear Power Plant Mochovce with the use of project digitization. Further on the contribution shows what kinds of supporting material has been elaborated, what kind of decisions have been issued to the finishing of the building, way of financing and also the assumption of investment return under the defined conditions. An orientation time schedule of the finishing of the building and the crucial steps for its security are presented in the conclusion

  18. Fuel leak testing performance at NPP Jaslovske Bohunice

    International Nuclear Information System (INIS)

    Slugen, V.; Krnac, S.; Smiesko, I.

    1995-01-01

    The NPP Bohunice VVER-440 fuel leak testing experience are relatively extensive in comparison with other VVER-440 users. As the first Europe NPP was adapted Siemens (KWU) in core-sipping equipment to VVER-440 units and since this time were have done these tests also for NPP Paks (Hungary) and NPP Dukovany (Czech Republic). The occurrence of leaking fuel assemblies in NPP is in the last 5 years relatively stabilised and low. A significant difference can be observed between type V-230 (31 leaks) and type V-213 (1 leak). None of of the indicated leaking fuel assemblies has been investigated in the hot cell. Therefore cannot be confirm the effective causes of leak occurrence. Nevertheless, the fuel failure rate and the performance of leak testing in NPP Bohunice are comparable to the world standard at PWR's. 1 tab., 2 figs., 3 refs

  19. Fuel leak testing performance at NPP Jaslovske Bohunice

    Energy Technology Data Exchange (ETDEWEB)

    Slugen, V; Krnac, S [Slovak Technical Univ., Bratislava (Slovakia); Smiesko, I [Nuclear Powr Plant EBO, Jaslovske Bohuce (Slovakia)

    1996-12-31

    The NPP Bohunice VVER-440 fuel leak testing experience are relatively extensive in comparison with other VVER-440 users. As the first Europe NPP was adapted Siemens (KWU) in core-sipping equipment to VVER-440 units and since this time were have done these tests also for NPP Paks (Hungary) and NPP Dukovany (Czech Republic). The occurrence of leaking fuel assemblies in NPP is in the last 5 years relatively stabilised and low. A significant difference can be observed between type V-230 (31 leaks) and type V-213 (1 leak). None of of the indicated leaking fuel assemblies has been investigated in the hot cell. Therefore cannot be confirm the effective causes of leak occurrence. Nevertheless, the fuel failure rate and the performance of leak testing in NPP Bohunice are comparable to the world standard at PWR`s. 1 tab., 2 figs., 3 refs.

  20. Preparation for Ignalina NPP decommissioning

    International Nuclear Information System (INIS)

    Medeliene, D.

    2004-01-01

    Latest developments of atomic energy in Lithuania, works done to prepare Ignalina NPP for final shutdown and decommissioning are described. Information on decommissioning program for Ignalina NPP unit 1, decommissioning method, stages and funding is presented. Other topics: radiation protection, radioactive waste management and disposal. Key facts related to nuclear energy in Lithuania are listed

  1. Surveillance of WWER-440 fuel performance

    International Nuclear Information System (INIS)

    Simko, J.; Urban, P.

    1999-01-01

    In this lecture next problems of surveillance of WWER-440 fuel performance are presented: surveillance of WWER-440 fuel performance at Mochovce NPP; basic data of WWER-440 reactor; in-core reactor measuring system 'SVRK'; basic level of SVRK; information output of basic level of SVRK; surveillance of fuel performance; table of permissible operation conditions of the reactor; limitation of the unit 1 power at the beginning of the operation; cyclic changes of power; future perspectives

  2. Krsko NPP Periodic Safety Review program

    International Nuclear Information System (INIS)

    Basic, I.; Spiler, J.; Novsak, M.

    2001-01-01

    The need for conducting a Periodic Safety Review for the Krsko NPP has been clearly recognized both by the NEK and the regulator (SNSA). The PSR would be highly desirable both in the light of current trends in safety oversight practices and because of many benefits it is capable to provide. On January 11, 2001 the SNSA issued a decision requesting the Krsko NPP to prepare a program and determine a schedule for the implementation of the program for 'Periodic Safety Review of NPP Krsko'. The program, which is required to be in accordance with the IAEA safety philosophy and with the EU practice, was submitted for the approval to the SNSA by the end of March 2001. The paper summarizes Krsko NPP Periodic Safety Review Program [1] including implemented SNSA and IAEA Expert Mission comments.(author)

  3. Financial and organizational models of NPP construction projects

    International Nuclear Information System (INIS)

    Ivanov, Timur

    2010-01-01

    The recent evolution of financial and organizational models of NPP projects can be truly reputed to open a new page of the world market of NPP construction. The definition of the concrete model is based mostly on specific cooperation backgrounds and current terms and conditions under which the particular NPP project is being evolved. In this article the most commonly known strategies and schemes of financing structuring for export NPP construction projects are scrutinized. Special attention is paid to the analysis of BOO/BOT models which are based on the public-private partnership. Most BOO/BOT projects in the power sector has Power Purchase Agreements (PPA) as an integral part of them. The PPA key principles are studied here as well. The flexibility and adaptability of the public-private partnership models for financing and organization of the NPP projects contributes substantially to the competitiveness of the NPP projects especially under current economic conditions. (orig.)

  4. Nuclear energetics as environmentally affable source - present and and future

    International Nuclear Information System (INIS)

    Suchomel, J.

    2002-01-01

    In this paper the situation in nuclear energetics in the world in 2000 year is presented. Climatic changes initiated by burning of the fossil fuels an influence of nuclear energetics are discussed. Author informs that European Union and U.S.A. supports developing of nuclear energetics. Nuclear phobia from radiation risk of some inhabitants is compared with risks of other man activities. Possibilities of the electricity production by alternative sources are compared. Liability of the Slovak Republic for decommissioning of two reactor of the V-1 Jaslovske Bohunice NPP in 2006 and 2008, which is compared with the Program of safety improvement of these reactors are discussed. Author and Slovak Nuclear Society accept gladly the suggestion of government of the Slovak Republic that they reassess this liability. The best alternative for decommissioned Jaslovske Bohunice NPP will be the completion of the 3 rd and 4 th blocks of the Mochovce NPP

  5. External flood probabilistic safety analysis of a coastal NPP

    International Nuclear Information System (INIS)

    Pisharady, Ajai S.; Chakraborty, M.K.; Acharya, Sourav; Roshan, A.D.; Bishnoi, L.R.

    2015-01-01

    External events pose a definitive challenge to safety of NPP, solely due to their ability to induce common cause failures. Flooding incidents at Le Blayais NPP, France, Fort Calhoun NPP, USA and Fukushima Daiichi have pointed to the importance of external flooding as an important contributor to NPP risk. A methodology developed for external flood PSA of a coastal NPP vulnerable to flooding due to tsunami, cyclonic storm and intense local precipitation is presented in this paper. Different tasks for EFPSA has been identified along with general approach for completing each task

  6. Predisposal of Radioactive Waste from NPP 1000 MWe

    International Nuclear Information System (INIS)

    Suryantoro

    2007-01-01

    Predisposal of radioactive waste from NPP 1000 MW which was planned to be operated in 2016 has been conducted. In this study NPP applying PWR type was assumed. This assessment comprises all aspects of radioactive waste coming from NPP. One through cycle was chosen consequently no reprocessing step will be conducted. The assessment shows that technologically all radioactive waste treatment process rising from NPP operation has similarities to the existing radioactive waste process conducted by RWI which has lower scale of waste amount. (author)

  7. Operation safety at Ignalina NPP

    International Nuclear Information System (INIS)

    Zheltobriukh, G.

    1999-01-01

    An improvement of operational safety at Ignalina NPP covers: improvement of management structure and safety culture; symptom-based emergency operating procedures; staff training and full scope simulator; program of components ageing; metal inspection; improvement of fire safety. The first plan of Ignalina NPP Safety culture development for 1997 purposed to the SAR recommendation implementation was prepared and approved by the General Director

  8. Treatment of NPP wastes using vitrification

    International Nuclear Information System (INIS)

    Sobolev, I.A.; Lifanov, F.A.; Stefanovsky, S.V.; Kobelev, A.P.; Savkin, A.E.; Kornev, V.I.

    1998-01-01

    Glass-based materials to immobilize various liquid and solid radioactive wastes generated at nuclear power plants (NPP) were designed. Glassy waste forms can be produced using electric melting including a cold crucible melting. Leach rate of cesium was found to be 10 -5 -10 -6 g/(cm 2 day) (IAEA technique). Volume reduction factor after vitrification reached 4-5. Various technologies for NPP waste vitrification were developed. Direct vitrification means feeding of source waste into the melter with formation of glassy waste form to be disposed. Joule heated ceramic melter, and cold crucible were tested. Process variables at treatment of Kursk, Chernobyl (RBMK), Kalinin, Novovoronezh (VVER) NPP wastes were determined. The most promising melter was found to be the cold crucible. Pilot plant based on the cold crucibles has been designed and constructed. Solid burnable NPP wastes are incinerated and slags are incorporated in glass. (author)

  9. NPP electrical price and tariff in the world

    International Nuclear Information System (INIS)

    Mochamad Nasrullah and Sriyana

    2010-01-01

    Construction of a Nuclear Power Plant (NPP) is always become a controversial issue. Nuclear utility and other party which support the NPP present a calculation of NPP electricity cost too optimistic. However for utility and other party that contra to nuclear present a calculation of NPP electricity cost too pessimistic. This study present to reduce the controversy of nuclear cost. In this study, capital cost (Engineering Procurement Construction, EPC) was taken from Asian, America and Europe, operating and maintenance cost uses experience data of PLN, and nuclear fuel cost uses data year of 2008 with high price, low price and average price scenario. The methodological tools used to compare electricity generation cost was LEGECOST, a program developed by IAEA (International Atomic Energy Agency), while for electricity tariff- price calculation using a program developed by PLN research and development center. With the discount rate 10%, the result shows that the cheapest electricity generation cost of NPP is less than 40 mills/kWh, and average electricity tariff was 55 mills/kWh. In the Europe countries the electricity tariff more expensive than NPP in Asia. However generating cost and electricity tariff of NPP in United Stated of America (USA) less competitive because investment cost more expensive. Generating cost and electricity tariff was different at each country depend on salary, labor wage, materials price, construction specification, regulation related to NPP and environment aspect. (author)

  10. Individual protection of NPP personnel

    International Nuclear Information System (INIS)

    Koshcheev, V.S.; Gol'dshtejn, D.S.; Chetverikova, Z.S.

    1983-01-01

    Specific features of NPP personnel individual protection are considered, mainly with respect to maintenance and repair works on various type reactors. The major concern is given to the selection and application reglamentations of the individual protection system (IPS), employment of sanitary locks, the organization of individual protection under the conditions of a heating microclimate. The ways are specified to the development and introduction of the most effective IPS and improvement of the entire NPP personnel individual protection system with respect to providing the necessary protection effect for maintaining high working capability of the personnel and minimizing the IPS impact on human organism functional systems. The accumulated experience in the personnel individual protection can be applied during construction and operation of NPP's in CMEA member-countries [ru

  11. Dissemination of Knowledge about NPP Instrumentation and Control Systems

    International Nuclear Information System (INIS)

    Yastrebenetsky, M.

    2016-01-01

    Full text: Instrumentation and control (I&C) systems are the most variable part in the nuclear power plants (NPP) comparatively with any other NPP systems. This statement is connected with the wide use of computers, rapid changes in information technologies, with the appearance of new computer complex electronic components, e.g., field programmable gate arrays (FPGA) and with appropriate point of their insertion into NPP I&C life cycle. The changes in NPP I&C systems require the dissemination of the knowledge about these systems. Lessons after Fukushima accident increase necessity of these actions. The elaboration and following dissemination of this knowledge took place in different directions: • Writing and issue of three new books about NPP I&C systems for specialists and for students which were issued in Ukrainian and USA public houses (the last book was issued in 2014); • Organization of five international scientific technical conferences, devoted to NPP I&C safety problems; • Elaboration of national (Ukrainian) standards and regulations pertaining to safety important NPP I&C systems (the last standard was issued in 2015) and participation in elaboration of international standards; • Lecturing for university students, NPP specialists and I&C designers. These actions in all directions are added to IAEA activity in the area NPP I&C systems (e.g., IAEA NP-T-3.12 “Core Knowledge on I&C systems in NPP”). (author

  12. Probabilistic assessment of NPP safety under aircraft impact

    International Nuclear Information System (INIS)

    Birbraer, A.N.; Roleder, A.J.; Arhipov, S.B.

    1999-01-01

    Methodology of probabilistic assessment of NPP safety under aircraft impact is described below. The assessment is made taking into account not only the fact of aircraft fall onto the NPP building, but another casual parameters too, namely an aircraft class, velocity and mass, as well as point and angle of its impact with the building structure. This analysis can permit to justify the decrease of the required structure strength and dynamic loads on the NPP equipment. It can also be especially useful when assessing the safety of existing NPP. (author)

  13. NPP Bohunice experience with ASSET services

    Energy Technology Data Exchange (ETDEWEB)

    Klimo, J [Bohunice NPP (Slovakia)

    1997-12-31

    The general description of Bohunice NPP ASSET experience history was given at the last annual workshop in 1995. In my short presentation I would like to pay attention to the progress in this area which was achieved at our NPP during the last year. (author).

  14. NPP Bohunice experience with ASSET services

    International Nuclear Information System (INIS)

    Klimo, J.

    1996-01-01

    The general description of Bohunice NPP ASSET experience history was given at the last annual workshop in 1995. In my short presentation I would like to pay attention to the progress in this area which was achieved at our NPP during the last year. (author)

  15. Akkuyu NPP – the first Turkish NPP. The new history of the project

    International Nuclear Information System (INIS)

    Tzocheva, V.

    2012-01-01

    An overview is given to the Turkish energy sector and nuclear power plans. The project for the construction of the first NPP in Turkey is presented. The general parameters of the Project are: CAPEX: $ 20 bln; Project design: NPP-2006; (VVER- 1200); Number of units: 4; Total capacity: 4 800 MW; Construction period: 2014 – 2023; PPA period; 15 years, fixed price terms. An account of the activities during 2011, the Worley Parsons participation are presented and a tentative project schedule is given

  16. Inspection Qualification Centre in NPP 'Kozloduy'

    International Nuclear Information System (INIS)

    Mikhovski, M.

    2000-01-01

    In May 1999 according to the working plan of the IAEA project RER 4/020 and the decision of the NPP the Inspection Qualification Centre (IQC) has been established in order to provide examination services in the NPP. During year 1999 IVC (AEA Technology) in the framework of the DTI project provides consulting and technical assistance to the NPP, IQC, Bulgarian Academy of Sciences and Regulatory Authorities in setting up the IQC infrastructure. Now IQC work as an independent inspection body B type. The IQC activities for the period 1999-2000 are presented and further tasks are outlined

  17. Chapter 15. Attachments

    International Nuclear Information System (INIS)

    2001-01-01

    In this chapter used abbreviations and radiation safety of NPPs in Slovak Republic are presented. Results of monitoring of NPP Bohunice V-1 and V-2 as well as NPP Mochovce are presented. A brief account of activities carried out by the Nuclear Regulatory Authority of the Slovak Republic in 2000 is presented. The collective dose is one of the fundamental indicators to assess the level of nuclear safety and safety culture. This is the total dose of both external and internal exposure of the whole of the body measured with a personal dosimeter and a calculated internal exposure over a certain period of time. Measured doses to the utility personnel, the staff of supplier organisations and official working visits are included

  18. Results and discussion

    International Nuclear Information System (INIS)

    1998-01-01

    The author deals with the experimental study of sorption, desorption and vertical migration of radionuclides in Sr-85 and Cs-137 in selected soil samples from around of NPP Bohunice and NPP Mochovce and other localities of the Slovakia. The influence of different materials [concurrent ions (K + , Ca 2+ , NH 4 + , pH), organic matter (peat) and zeolite, humidity] on kinetic of sorption and desorption of strontium and cesium as well as distribution coefficient (K D ) and transfer coefficients in followed samples of soils were followed. Obtained adsorption isotherm are presented and discussed. Using the Tessiere's sequential extraction analysis a gross variability in binding of radionuclides on soils was found. The obtained results were processed with the correlation analysis and the compartment model

  19. Metamorphosis of NPP A1, V1, V2

    International Nuclear Information System (INIS)

    Dobak, D.; Moncekova, M.

    2005-01-01

    In this book the history of construction, commissioning and exploitation of NPP A1, NPP V1 and NPP V2 in Jaslovske Bohunice is presented on documentary photos. Vicinity around of these NPPs is presented, too

  20. NPP A-1 decommissioning - Phase I

    International Nuclear Information System (INIS)

    Krstenik, A.; Blazek, J.

    2000-01-01

    Nuclear power plant A-1 with output 150 MW e , with metallic natural uranium fuelled, CO 2 cooled and heavy water moderated reactor had been prematurely finally shut down in 1977. It is necessary to mention that neither operator nor regulatory and other authorities have been prepared for the solution of such situation. During next two consecutive years after shutdown main effort of operator focused on technical and administrative activities which are described in the previous paper together with approach, condition and constraints for NPP A-1 decommissioning as well as the work and research carried out up to the development and approval of the Project for NPP A-1 decommissioning - I. phase. Subject of this paper is description of: (1) An approach to NPP A -1 decommissioning; (2) An approach to development of the project for NPP A-1 decommissioning; (3) Project - tasks, scope, objectives; (4) Mode of the Project realisation; (5) Progress achieved up to the 1999 year. (authors)

  1. Monitoring program of surrounding of the NPP SE-EBO

    International Nuclear Information System (INIS)

    Dobis, L.; Kostial, J.

    1997-01-01

    The paper dealt with monitoring program of radiation control of surrounding of the NPP Bohunice, which has the aim: (1) to ensure the control of influence of work of the NPP Bohunice on the environment in their surrounding; (2) to ensure the back-ground for regular brief of control and supervisory organs about condition of the environment in surrounding of the NPP Bohunice; (3) to maintain the expected technical level of control of the NPP Bohunice and to exploit optimally the technical means; (4) to solicit permanently the data about the radioactivity of environment in surrounding of the NPP Bohunice for forming of files of the data; (5) to exploit purposefully the technical equipment, technical workers and to maintain their in permanent emergency and technical eligibility for the case of the breakdown; (6) to obtain permanently the files of the values for qualification of the reference levels. This program of monitoring includes the radiation control of surrounding of the NPP Bohunice, in the time of normal work of power-station's blocks, inclusively of all types of trouble-shooting and repairer works in surrounding of the NPP Bohunice, up to distance 20 km from power-station. The monitoring includes: outlets from the NPP Bohunice, monitoring of radiation characteristics in surrounding of the NPP Bohunice, (aerosols, fall-outs, soil), the links of food chains: (grass and fodder, milk, agriculture products), hydrosphere in surrounding (surface waters, drink water, bores of radiation control in complex of the NPP Bohunice, components of the hydrosphere), measurement of radiation from external sources (measurement of the dose rates, measurement of the doses [sk

  2. Sociological investigations on Ignalina NPP and within its surroundings

    International Nuclear Information System (INIS)

    Chiuzhas, A.

    1998-01-01

    The purpose of this study was to determine the impact of Ignalina NPP and Visaginas town on the social territorial processes in the region and to reveal the impact of Ignalina NPP on the regional economic, social, demographic, political and cultural processes in the context of ecological and psychological affect. According to the results of this research three quarters of the inhabitants and the functionaries of local administration hold an opinion that operation of Ignalina NPP posses threat for the population and environment. Meanwhile they are sure that danger of Ignalina NPP is not critical. 21 - 35 % of the local administrators speak for the closure of Ignalina NPP , whereas half of Visaginas residents and three quarters of the local administrators indicate that operation of reactors is expedient. Over 90% of the population do not have sufficient information on the operation of Ignalina NPP. In the opinion of the rest Lithuanian people Ignalina NPP zone is related with the physical danger and the image of Visaginas residents as the 'others', 'strangers'. More than 90% of Ignalina NPP employees are Russian speaking, not native Lithuanians. The social relations of Visaginas with the environment are poor as a result of the situation of the town, lack of communications and cultural self isolation. (author)

  3. Ageing management database development for PWR NPP steam generator

    International Nuclear Information System (INIS)

    Liu Hongyun; Xu Liangjun; Xiong Changhuai; Wang Xianyuan

    2005-01-01

    Steam generator (SG) is one of the key safe important equipment of NPP, which is covered by NPP aging management program. Steam Generator Aging Management Dabatase (SGAMDB) is developed to provide necessary information for SG aging management. RINPO is developing SGAMDB for domestic NPP. This system contains information and data about SG design, manufacture, operation and maintenance. The information include NPP fundamental data, SG design data, SG aging mechanism, SG operation data, SG ISI data, SG maintenance data and SG evaluation interface. The system runs at the intranet of Qinshan-1 NPP with B/S mode. It can provide information inquire and fundamental analysis for NPP SG aging team and SG aging researcher's. In addition, it provides necessary information and data for SG aging analysis and evaluation, such as all pressure test process and flaws of tubes, and collects the analysis results. (authors)

  4. Principles of tariff determination for NPP electric power generation

    International Nuclear Information System (INIS)

    Ratnikov, B.E.; Gitel'man, L.D.; Artemov, Yu.N.; Fiantsev, V.S.

    1988-01-01

    Foundations of price-setting and order of accounting arrangement for NPP electric power are considered. NPP tariffs are established proceeding from standard costs of power generation. The standards are differentiated as to NPP groups, depending on technical, regional and natural geographic factors, taking into account the facility type, unit capacity and the number of similar NPP units. The conclusion is made that under conditions of NPP economic independence expansion and creation of prerequisites for going over to self-financing principles and also due to the qualitatively new stage of nuclear power generation development the level of efficiency, forseen by the tariffs, should be increased

  5. Leningrad NPP and energetics of north-western Russia

    International Nuclear Information System (INIS)

    Belov, I.

    2000-01-01

    Problems of Leningrad NPP operating units modernization, their design service life finishing by year of 2010, are discussed. To assure safe operation of unit 1 investments in the amount of 30 mln. dol are necessary. Estimations suggest economic efficiency of the measures, permitting saving of 300 mln. dol worth of gas. Unfortunately, without a rise in tariff for electric power produced by NPP it seems impossible. It is recommended that substantiated tariffs are set for electric power produced by NPP starting from January, 2000. The measure is indispensable for raising investment funds intended for operating NPP modernization [ru

  6. Overview of Cernavoda NPP training programme

    International Nuclear Information System (INIS)

    Valache, Cornelia

    2005-01-01

    Full text: The paper presents a general assessment of Cernavoda NPP personnel training programme, highlighting the role of training in human performance improvement. Cernavoda NPP Personnel Training and Authorization Department (PTAD) is the one responsible for the training of Unit 1 and 2 staff. PTAD is structured in such a manner as to support and respond to all Cernavoda NPP training, qualification and authorization requirements. The training of personnel is continuously adapted based on IAEA Guides and INPO/WANO recommendations, to keep with world standards, based on the internal and external reviews. At Cernavoda NPP the Training Concept and the Training Programmes are based on SAT - Systematic Approach to Training. The Training Concept is established on a set of training documents (RD's, SI's, IDP's), which address all the SAT phases: Analysis, Design, Development, Implementation and Evaluation. The Training Programmes are structured on the initial and continuing personnel training. Their content and goals respond to the training specific needs for each plant major job family. In order to successfully support NPP training programmes, CNPP training center has upgraded classrooms with new presentation facilities and there are plans to expand the space of the building, to develop additional operator and maintenance skills facilities. There are also a number of general areas for improvement of PTAD activity, such as operators and maintenance training, initial and continuing training of both Unit 1 and 2 staff. By responding in a timely and completely manner to all plant training requirements PTAD will help in rising human performance of Cernavoda NPP personnel, supporting the safe, efficient and cost effective production of power. (author)

  7. Organization of monitoring of agricultural products in NPP region

    International Nuclear Information System (INIS)

    Panteleev, L.I.; Spirin, E.V.; Sanzharova, N.I.

    1990-01-01

    Problem of organizing chemical and radiation monitoring of agricultural products in NPP region is considered. Attention is paid to monitoring during NPP siting and designing, to monitoring of radioactive contamination of agricultural products under normal NPP operation, emergency situations and decommissioning

  8. Belene NPP

    International Nuclear Information System (INIS)

    Tsvetanov, P.

    1990-01-01

    The book presents the main results of the studies of the Bulgarian Academy of Sciences (BAS) on the construction of a new nuclear power plant at Belene on the Danube river. The programme of the studies comprises five areas: the socio-economic and energy development and the necessity of the commissioning; a technical project and design level of the equipment (safety, radioactivity control, waste disposal and economic efficiency of the power plant); the seismic properties of the construction site; the corresponding risk and design features of the plant; the ecological impacts of the NPP and public opinion. The studies in the different areas have been carried out by independent teams, fully responsible for the formulated topical conclusions. The general opinion of the BAS voiced in the book is that the construction of Belene NPP is not sufficiently substantiated and is considered unacceptable. 94 refs., 53 fig., 56 tabs. (R.Ts.)

  9. Study on human factor at NPP

    International Nuclear Information System (INIS)

    Nopp, I.

    1984-01-01

    Factors affecting the reliabilty of the reactor control by an NPP operator are considered on the base of the Czechoslovakia NPP operating experience. The reliability level of NPP operators depends on objective factors (conditions and regime of labour) determining the labour productivity and on subjective ones (psychological morale, physical and mental abilities and occupational level of personnel). Problems of the effect of physical and mental abilities and professional level on the reliability of personnel are considered to be the most important ones. The effect of individual abilities and specific features of the human body on changes in his occupational abilities can be estimated only to a certain degree

  10. Perspectives of NPP personnel training in the future?

    International Nuclear Information System (INIS)

    Khess, R.E.

    1996-01-01

    Problems of the NPP personnel education are discussed during radical reorganization of the state regulation of energy production and distribution when nuclear energetics will appears in the market conditions. Effective methods of the NPP personnel training developed by the corporation GPU Nuclear are given. Potentials of the application of simulators and computerized programs for increasing the NPP personnel education efficiency are considered

  11. Integrated ageing management of Atucha NPP

    International Nuclear Information System (INIS)

    Ranalli, Juan M.; Marchena, Martin H.; Zorrilla, Jorge R.; Antonaccio, Elvio E.; Brenna, Pablo; Yllanez, Daniela; Cruz, Gerardo Vera de la; Luraschi, Carlos; Sabransky, Mario

    2013-01-01

    Atucha NPP is a two PHWR unit site located in Lima, Province of Buenos Aires, 120 km north of Buenos Aires, Argentina. Until recent, the site was split in Atucha I NPP, a 350 MW pressure vessel heavy water reactor in operation since 1974; and Atucha II, a similar design reactor, twice as big as Atucha I finishing a delayed construction. With the start-up of Atucha II and aiming to integrate the management of the plants, the Utility (Nucleolectrica Argentina Sociedad Anonima - NASA) has reorganized its operation units. Within this reorganization, an Ageing Management Department has been created to cope with all ageing issues of both Atucha I and II units. The Atomic Energy Commission of Argentina (Comision Nacional de Energia Atomica - CNEA) is a state-owned R and D organization that; among other functions such as designing and building research reactors, developing uranium mining and supplying radioisotopes to the medical market; is in charge of providing support and technological update to all Argentinean NPPs. The Ageing Management Department of Atucha NPP and the Ageing Management Division of CNEA has formed a joint working group in order to set up an Integrated Ageing Management Program for Atucha NPP following IAEA guidelines. In the present work a summary of the activities, documental structure and first outputs of the Integrated Ageing Management Program of Atucha NPP is presented. (author)

  12. Integrated Ageing Management of Atucha NPP

    International Nuclear Information System (INIS)

    Ranalli, J.M.; Marchena, M.H.; Zorrilla, J.R.; Sabransky, M.

    2012-01-01

    Atucha NPP is a two PHWR unit site located in Lima, Province of Buenos Aires, 120 km north of Buenos Aires, Argentina. Until recent, the site was split in Atucha I NPP, a 350 MW pressure vessel heavy water reactor in operation since 1974; and Atucha II, a similar design reactor twice as big as Atucha I finishing a delayed construction . With the start-up of Atucha II and aiming to integrate the management of the plants, the Utility (Nucleolectrica Argentina Sociedad Anonima - NASA) has reorganized its operation units. Within this reorganization, an Ageing Management Department has been created to cope with all ageing issues of both Atucha I and II units. The Atomic Energy Commission of Argentina (Comision Nacional de Energia Atomica - CNEA) is a state-owned R and D organization that; among other functions such as designing and building research reactors, developing uranium mining and supplying radioisotopes to the medical market; is in charge of providing support and technological update to all Argentinean NPPs. The Ageing Management Department of Atucha NPP and the Ageing Management Division of CNEA has formed a joint working group in order to set up an Integrated Ageing Management Program for Atucha NPP following IAEA guidelines. In the present work a summary of the activities, documental structure and first outputs of the Integrated Ageing Management Program of Atucha NPP is presented. (author)

  13. Integrated ageing management of Atucha NPP

    Energy Technology Data Exchange (ETDEWEB)

    Ranalli, Juan M.; Marchena, Martin H.; Zorrilla, Jorge R.; Antonaccio, Elvio E.; Brenna, Pablo; Yllanez, Daniela; Cruz, Gerardo Vera de la; Luraschi, Carlos, E-mail: ranalli@cnea.gov.ar [Gerencia Coordinacion Proyectos CNEA-NASA, Comision Nacional de Energia Atomica, Buenos Aires (Argentina); Sabransky, Mario, E-mail: msabransky@na-sa.com.ar [Departamento Gestion de Envejecimiento, Central Nuclear Atucha I-II Nucleoelectrica Argentina S.A., Provincia de Buenos Aires (Argentina)

    2013-07-01

    Atucha NPP is a two PHWR unit site located in Lima, Province of Buenos Aires, 120 km north of Buenos Aires, Argentina. Until recent, the site was split in Atucha I NPP, a 350 MW pressure vessel heavy water reactor in operation since 1974; and Atucha II, a similar design reactor, twice as big as Atucha I finishing a delayed construction. With the start-up of Atucha II and aiming to integrate the management of the plants, the Utility (Nucleolectrica Argentina Sociedad Anonima - NASA) has reorganized its operation units. Within this reorganization, an Ageing Management Department has been created to cope with all ageing issues of both Atucha I and II units. The Atomic Energy Commission of Argentina (Comision Nacional de Energia Atomica - CNEA) is a state-owned R and D organization that; among other functions such as designing and building research reactors, developing uranium mining and supplying radioisotopes to the medical market; is in charge of providing support and technological update to all Argentinean NPPs. The Ageing Management Department of Atucha NPP and the Ageing Management Division of CNEA has formed a joint working group in order to set up an Integrated Ageing Management Program for Atucha NPP following IAEA guidelines. In the present work a summary of the activities, documental structure and first outputs of the Integrated Ageing Management Program of Atucha NPP is presented. (author)

  14. Chernobyl NPP decommissioning efforts - Past, Present and Future. Decommissioning Efforts on Chernobyl NPP site - Past, Present

    International Nuclear Information System (INIS)

    Kuchinskiy, V.

    2017-01-01

    Two unique large-scale projects are underway at the moment within the Chernobyl - Exclusion zone - Shelter object transformation into ecologically safe system and the decommissioning of 3 Chernobyl NPP Units. As a result of beyond design accident in 1986 the entire territory of the industrial site and facilities located on it was heavily contaminated. Priority measures were carried out at the damaged Unit under very difficult conditions to reduce the accident consequences and works to ensure nuclear and radiation safety are continuous, and the Unit four in 1986 was transformed into the Shelter object. Currently, works at the Shelter object are in progress. Under assistance of the International Community new protective construction was built above the existing Shelter object - New Safe Confinement, which will ensure the SO Safety for the long term - within up to 100 years. The second major project is the simultaneous decommissioning of Chernobyl NPP Units 1, 2 and 3. Currently existing Chernobyl NPP decommissioning Strategy has been continuously improved starting from the Concept of 1992. Over the years the following was analyzed and taken into account: the results of numerous research and development works, international experience in decommissioning, IAEA recommendations, comments and suggestions from the governmental and regulatory bodies in the fields of nuclear energy use and radioactive waste management. In 2008 the final decommissioning strategy option for Chernobyl NPP was approved, that was deferred gradual dismantling (SAFSTOR). In accordance with this strategy, decommissioning will be carried out in 3 stages (Final Shutdown and Preservation, Safe Enclosure, Dismantling). The SAFSTOR strategy stipulates: -) the preservation of the reactor, the primary circuit and the reactor compartment equipment; -) the dismantling of the equipment external in relation to the reactor; -) the safe enclosure (under the supervision); -) the gradual dismantling of the primary

  15. Project No. 10 - Partial restoration of Ignalina NPP territory

    International Nuclear Information System (INIS)

    2000-01-01

    At present Ignalina NPP territory makes a total of 2544 ha of land. Due to termination of construction activity development and due to the decision taken to shutdown unit 1 the need in such a territory fell off. For normal and safe operation of Ignalina NPP 1440 ha is enough, including 1237 ha for of Ignalina NPP administrative area and 203 ha for auxiliary objects. Ignalina NPP will have to rearrange territory, forestry that was damaged during the construction activities of the plant and to restore the damaged farmlands and to pass the rearranged forestry that belonged to the Ignalina NPP to the Ministry of Forestry. The total estimated cost of the project is about 1.042 M EURO

  16. Main principles of NPP project ecological expert investigation

    International Nuclear Information System (INIS)

    Dibobes, I.K.; Revina, S.K.; Glushkov, V.P.

    1983-01-01

    NPP project ecological expert investigation among the other objectives is to provide implementation of standards, rules and requirements as well as government decrees and international obligations of the USSR concerning the environment protection. The expert investigation takes into consideration both environment protection, regional, resources, ecological, demographic and economic aspects. The NPP siting and the local environment and resources state are estimated as well as the structure of utilization of the latter, the expected damage to the environment due to NPP construction and the measures directed towards the optimal using of natural resources. On the basis of the presented issues suggestions about NPP projects coordination with Goskomgidromet's institutions are given [ru

  17. Regulatory approach to NPP ageing in Bulgaria

    International Nuclear Information System (INIS)

    Vassilev, D.

    2000-01-01

    In this contribution summary information of Kozloduy NPP units is presented. The nuclear legislation, regulatory approach for managing safety aspects on NPP ageing, short term programme, complex programme PRG'97 ant other aspects of ageing management are discussed

  18. Automatic control system at the ''Loviisa'' NPP

    International Nuclear Information System (INIS)

    Kukhtevich, I.V.; Mal'tsev, B.K.; Sergievskaya, E.N.

    1980-01-01

    Automatic control system of the Loviisa-1 NPP (Finland) is described. According to operation conditions of Finland power system the Loviisa-1 NPP must operate in the mode of week and day control of loading schedule and participate in current control of power system frequency and capacity. With provision for these requirements NPP is equipped with the all-regime system for automatic control functioning during reactor start-up, shut-down, in normal and transient regimes and in emergency situations. The automatic control system includes: a data subsystem, an automatic control subsystem, a discrete control subsystem including remote, a subsystem for reactor control and protection and overall station system of protections: control and dosimetry inside the reactor. Structures of a data-computer complex, discrete control subsystems, reactor control and protection systems, neutron flux control system, inside-reactor control system, station protection system and system for control of fuel element tightness are presented in short. Two-year experience of the NPP operation confirmed advisability of the chosen volume of automatization. The Loviisa-1 NPP operates successfully in the mode of the week and day control of supervisor schedule and current control of frequency (short-term control)

  19. EMAS at Doel NPP

    International Nuclear Information System (INIS)

    Nolan, Peter; Thoelen, Els

    1998-01-01

    In October 1995, Doel NPP of Electrabel, Belgium opted to seek registration under the EC Eco-management and Audit Scheme (EMAS). A comprehensive environmental management system (EMS) has been introduced and implemented, encompassing all four PWRs and the supporting departments. A critical step was to seek certification from an accredited environmental auditing body against the International Standard ISO 14001. This provided the foundation for the publicly available environmental statement required by EMAS. The complications of achieving EMAS at a time when national and international standards were being re-formulated were successfully overcome and Doel NPP passed its EMAS audit in June 1997. (author)

  20. On psichological problem of NPP operation and control

    International Nuclear Information System (INIS)

    Mashin, V.A.

    1994-01-01

    The role of psichological factor as a reserve for increasing NPP safety connected with human factor is discussed. It is emphasized that the process of NPP personnel professional training should not be restricted by formation of a certain set of knowledge, skills and experience. It is necessary to initiate ability for constant self-developing. Control for assurance of effective interaction of the whole NPP personnel is an important problem

  1. Bohunice V1 NPP upgrading programme

    International Nuclear Information System (INIS)

    Kerak, J.

    2001-01-01

    The paper describes whole process of Bohunice V1 NPP nuclear safety and operational reliability level increase which has been performed since units commissioning (1. unit in 1978, 2. unit in 1980), continued Small Reconstruction (1991 -1993) and finished Gradual Upgrading(1994 -2000). The main purpose is to last stage -Gradual upgrading of Bohunice V1 NPP. (author)

  2. Psychology of NPP operation safety

    International Nuclear Information System (INIS)

    Tret'yakov, V.P.

    1993-01-01

    The book is devoted to psychologic investigations into different aspects of NPP operative personnel activities. The whole set of conditions on which successful and accident-free personnel operation depends, is analysed. Based on original engineering and socio-psychologic investigations complex psychologic support for NPP personnel and a system of training and upkeep of operative personnel skills are developed. The methods proposed have undergone a practical examination and proved their efficiency. 154 refs., 12 figs., 9 tabs

  3. Regulatory aspects of NPP safety

    International Nuclear Information System (INIS)

    Kastchiev, G.

    1999-01-01

    Extensive review of the NPP Safety is presented including tasks of Ministry of Health, Ministry of Internal Affairs, Ministry of Environment and Waters, Ministry of Defense in the field of national system for monitoring the nuclear power. In the frame of national nuclear safety legislation Bulgaria is in the process of approximation of the national legislation to that of EC. Detailed analysis of the status of regulatory body, its functions, organisation structure, responsibilities and future tasks is included. Basis for establishing the system of regulatory inspections and safety enforcement as well as intensification of inspections is described. Assessment of safety modifications is concerned with complex program for reconstruction of Units 1-4 of Kozloduy NPP, as well as for modernisation of Units 5 and 6. Qualification and licensing of the NPP personnel, Year 2000 problem, priorities and the need of international assistance are mentioned

  4. From the chronicle of training of Dukovany NPP staff

    International Nuclear Information System (INIS)

    2005-01-01

    The long way the Dukovany NPP had to go before the plant staff was fully qualified and skilled is described. First the training concept was prepared, then the necessary training facilities were set up, lecturers and instructors were hired and trained, training programmes and training materials were developed, and ultimately the first training course was launched in 1979. A training NPP was constructed and a full-scope simulator of the Dukovany NPP was set up. The current status of organization of NPP staff training by the CEZ utility is highlighted. (author)

  5. Training center of Rovenskaya NPP. The experience of creation

    International Nuclear Information System (INIS)

    Fedorov, O.M.; Aristov, B.N.

    1991-01-01

    Experience in creation of a teaching-training centre at the Rovno NPP, which uses means available at unified NPPs, at most is discussed. The centre hardware complex functions include the event filing and providing for user-friendly interface with NPP technical personnel under training. The system of personnel training at the Rovno NPP teaching-training centre gives an opportunity to analyze accidents and emergency conditions more completely and carefully. The taching analysis of failures and accidents by a NPP operators using the complex of the teaching-training centre hardware sufficiently improves knowledge of particular accidents

  6. Observation and modeling of NPP for Pinus elliottii plantation in subtropical China

    Institute of Scientific and Technical Information of China (English)

    MA ZeQing; LIU QiJing; WANG HuiMin; LI XuanRan; ZENG HuiQing; XU WenJia

    2008-01-01

    Based on the stem analysis of 59 individuals of Pinus elliottii in combination with tree biomass models,we calculated annual biomass increment of forest plots at Qianyanzhou Ecological Station,Chinese Academy of Sciences in subtropical China. In addition,canopy layer and community NPP were calculated based on 12 years' litter fall data. NPP of the 21-year-old forest was estimated by using the BIOME BGC model; and both measured NPP and estimated NPP were compared with flux data. Community lation between annual litter fall and annual biomass increment; and the litter fall was 1.19 times the biomass increment of living trees. From 1985 to 2005,average NPP and GPP values based on BGC simulated tree layer NPP values. NPP accounted for 30.2% (25.6%-32.9%) of GPP,while NEP accounted for 57.5% (48.1%-66.5%) of tree-layer NPP and 41.74% (37%-52%) of stand NPP. Soil respiration accounted for 77.0% of measured tree NPP and 55.9% of the measured stand NPP. NEE based on eddy covariance method was 12.97% higher than the observed NEP.

  7. Ecological impacts and damage - comparison of selected components for nuclear and conventional power plants (example of Mochovce nuclear power plant)

    International Nuclear Information System (INIS)

    Bucek, M.

    1984-01-01

    A comparison is given of ecological damage for the nuclear power plant in Mochovce and a conventional power plant with the same power. Ecological effects and damage are divided into three groups: comparable damage, ecological damage caused only by conventional power plants and ecological damage caused only by nuclear power plants. In the first group the factors compared are land requisition, consumption of utility water and air consumption. In the second group are enumerated losses of crops (cereals, sugar beet, potatoes, oleaginous plants) and losses caused by increased disease rate owing to polluted environment by conventional power plants. In the third group health hazards are assessed linked with ionizing radiation. Also considered are vent stack escapes. (E.S.)

  8. Investigation of interfacing NPP simulators with PSCAD software

    International Nuclear Information System (INIS)

    Zahedi, P.

    2006-01-01

    This paper demonstrates a new method of interfacing a NPP simulator with the PSCAD software so that the interaction between the plant dynamics and the grid dynamics can be studied. Through this method, data extracted from NPP simulator, as an object, will be communicated to a server running PSCAD software. This paper will illustrate the use of Remote Procedure Calls (RPC) as a distributed, client-server based application used to establish a connection between NPP simulator running on UNIX server and PSCAD running on a PC. Using this method, the called procedure need not exist in the same address space as the calling procedure. Communication protocols available in the NPP simulator are used to export data from the simulator. (author)

  9. Licensing of the Ignalina NPP

    International Nuclear Information System (INIS)

    Kutas, S.

    1999-01-01

    Since 1991 State Nuclear Power Safety Inspectorate (VATESI) has regulated Ignalina NPP operation by issuing annual operating permits. Those have been issued following submission of specified documents by the Ignalina NPP that have been reviewed by VATESI. However, according to to the procedures that are now established in the Law on Nuclear Energy and subordinate regulations the use of nuclear energy in the Republic of Lithuania is subject to strict licensing. Therefore a decision about the licence for continued operation of unit 1 should be taken. Licence would be granted by VATESI in cooperation with the Ministry of Health, Ministry of Environment and the institutions of local authorities. Ignalina NPP presented to the VATESI safety analysis report (SAR) with other documents. SAR was made mainly by foreign experts and financed by European Bank for Reconstruction and Development (EBRD). VATESI in this process is supported by western regulators. A special project LAP - Licensing Assistance Project was launched to help VATESI perform licensing according western practices

  10. Safety Analysis Report for Ignalina NPP

    International Nuclear Information System (INIS)

    Negrivoda, G.

    1997-01-01

    In December 1994 an agreement was signed between the European Bank for Reconstruction and Development and the Republic of Lithuania for the grant of 32.86 MECU for the safety Improvement at Ignalina NPP. One of the conditions for the provision of the grant, was a requirement for an in-depth analysis of the safety level at Ignalina NPP in the scope and according to the standards acceptable for a western nuclear power plant, and to publish a Safety Analysis Report (SAR). The report should investigate and analyze any factor that could limit a safe operation of the plant, and provide recommendations for actual safety improvements. According to the agreement, Lithuania had to finalize the SAR until 31 December, 1995. The bank has also organized and financed investigation of safety at Ignalina NPP and preparation of the SAR. EBRD made an agreement with Sweden's Vattenfall, which subcontracted well-known companies from Canada, USA, Germany, etc., and also the Russian Research and Development Institute of Power Engineering (NIKIET), reactor designer of Ignalina NPP. The SAR is a very comprehensive document and contains about 8000 pages of text, diagrams and tables. The main findings of the SAR are provided in the article. A large number of discrepancies with modern rules and western practices was detected, but they were not proved to be serious enough to require reactors shutdown. Based on the recommendations of the SAR Ignalina NPP has worked out Safety Improvement Program No. 2 (SIP-2), which is planned for three years and will cost 486 MLT. (author)

  11. Research on the NPP human factors engineering operating experience review

    International Nuclear Information System (INIS)

    Ren Xiangchen; Miao Hongxing; Ning Zhonghe

    2006-01-01

    This paper addresses the importance of the human factors engineering (HFE) for the design of nuclear power plant (NPP), especially for the design of human-machine interface in the NPP. It also summarizes the scope and content of the NPP HFE. The function, scope, content and process of the NPP human factors engineering operating experience review (OER) are mainly focused on, and significantly discussed. Finally, it briefly introduces the situation of the studies on the OER in China. (authors)

  12. Reserves of labour content reduction in NPP construction

    International Nuclear Information System (INIS)

    Bekerman, R.E.

    1986-01-01

    Specific labour contents when constructing NPP with RBMK-1000 and WWER-1000 type reactors are presented. Factors affecting labour content of NPP construction are shown. Measures aimed at labour content decrease are suggested

  13. Reactor plant for Belene NPP completion

    International Nuclear Information System (INIS)

    Dragunov, Yu. G.; Ryzhov, S. B.; Ermakov, D. N.; Repin, A. I.

    2004-01-01

    Construction of 'Belene' NPP was started at the end of 80-ties using project U-87 with V-320 reactor plant, general designer of this plant is OKB 'Gidropress'. At the beginning of 90-ties, on completing the considerable number of deliveries and performance of civil engineering work at the site the NPP construction was suspended. Nowadays, considering the state of affairs at the site and the work performed by Bulgarian Party on preservation of the equipment delivered, the most perspective is supposed to be implementation of the following versions in completing 'Belene' NPP: for completion of Unit 1 - reactor plant VVER-1000 on the basis of V-320 reactor with the maximum use of the delivered equipment (V-320M) having the extended service life and safety improvement; for Unit 2 - advanced reactor plant VVER-1000. For the upgraded reactor plant V-230M the basic solutions and characteristics are presented, as well as the calculated justification of strength and safety analyses, design of the reactor core and fuel cycle, instrumentation and control systems, application of the 'leak-before break' in the project and implementation of safety measures. For the modernised reactor plant V-392M the main characteristics and basic changes are presented, concerning reactor pressure vessel, steam generator, reactor coolant pump set. Design of NPP with the modernized reactor plant V-320M meets the up-to-date requirements and can be licensed for completion and operation. In the design of NPP with the advanced reactor plant the basic solutions and the equipment are used that are similar to those used in standard reactor plant V-320 and new one with VVER-1000 under construction and completion in Russia, and abroad. Compliance of reactor design with the up-to-date international requirements, considering the extended service life of the main equipment, shows its rather high potential for implementation during completion of 'Belene' NPP

  14. NPP Krsko secondary side analysis

    International Nuclear Information System (INIS)

    Fabijan, Lj.

    1987-01-01

    The purpose of this work is to analyze secondary side thermohydraulics response on steam generator tube plugging in order to ensure nominal NPP power. We had established that the additional opening of the governing valve No. 3 and 4 can compensate pressure drop caused by steam generator tube plugging. Two main steam flows with four governing valves were simulated. Steam expansion in turbine and feed water system was modeled separately. All important process point and steam moisture changes impact on nominal NPP power were analysed. (author)

  15. Hydrodynamics and sediment transport at Muria Peninsula NPP Site

    International Nuclear Information System (INIS)

    Heni Susiati; Berni A Subki; Harman A

    2011-01-01

    Coastal along the coast of the Muria Peninsula, particularly the location of the Muria NPP site candidate is a dynamic region, the interaction between physical oceanographic factors such as currents, waves and tides in the coastal sediments cause abrasion or accretion. Interactions have resulted in coastal dynamics needs to be considered in siting NPP is essential in order to plan. Capacity of hydro-oceanographic data is essential in order to plan the development of the Muria NPP. The process of selecting a safe site for hydro-oceanographic aspects carried out according to IAEA safety standards on site selection. For the evaluation stage of hydro oceanographic potential site (site survey stage), the analysis is more focused on the tidal along the northern coast, bathymetry, potential water resources and hydrologic systems in the Muria NPP siting locations, Jepara. The method used is a secondary, confirmation of field data collection and interpretation of modeling results. The results showed that the preparation for the construction of NPP need to be evaluated further to coastal conditions with respect to the increase coastal erosion in the area of prospective NPP siting. (author)

  16. Human Resources Training Requirement on NPP Operation and Maintenance

    International Nuclear Information System (INIS)

    Nurlaila; Yuliastuti

    2009-01-01

    This paper discussed the human resources requirement on Nuclear Power Plant (NPP) operation and maintenance (O&M) phase related with the training required for O&M personnel. In addition, this paper also briefly discussed the availability of training facilities domestically include with some suggestion to develop the training facilities intended for the near future time in Indonesia. This paper was developed under the assumptions that Indonesia will build twin unit of NPP with capacity 1000 MWe for each using the turnkey contract method. The total of NPP O&M personnel were predicted about 692 peoples which consists of 42 personnel located in the head quarter and the rest 650 people work at NPP site. Up until now, Indonesia had the experience on operating and maintaining the nonnuclear power plant and several research reactors namely Kartini Reactor Yogyakarta, Triga Mark II Reactor Bandung, and GA Siwabessy Reactor Serpong. Beside that, experience on operating and maintaining the NPP in other countries would act as one of the reference to Indonesia in formulating an appropriate strategy to develop NPP human resources particularly in O&M phases. Education and training development program could be done trough the cooperation with vendor candidates. (author)

  17. Safety culture in Ignalina NPP, regulatory view

    Energy Technology Data Exchange (ETDEWEB)

    Maksimovas, G [VATESI (Lithuania)

    1997-09-01

    The presentation describes how success on the way to a high level Safety Culture in Ignalina NPP may be achieved by daily, well motivated activities with good attitude and proper management participation, ensuring the development and proper implementation of Safety Culture principles within the activities of Operational organization of Ignalina NPP.

  18. Safety culture in Ignalina NPP, regulatory view

    International Nuclear Information System (INIS)

    Maksimovas, G.

    1997-01-01

    The presentation describes how success on the way to a high level Safety Culture in Ignalina NPP may be achieved by daily, well motivated activities with good attitude and proper management participation, ensuring the development and proper implementation of Safety Culture principles within the activities of Operational organization of Ignalina NPP

  19. Conference: Nuclear Safety at the Ignalina NPP - Achievements and Challenges

    International Nuclear Information System (INIS)

    1999-01-01

    Brief description of conference which took place in Vilnius on 8-9 April 1999 is presented. The aim of the international conference is to review the work carried out, to evaluate its influence on the nuclear safety, to get acquainted with the safety system of the Ignalina NPP. On December 31, the Ignalina NPP celebrated its 15 year anniversary. During that period the Ignalina NPP has produced more than 182 billion kWh of electricity. Nuclear power is not only immense economic benefit but also a syndrome of fear of an atomic bomb and the Chernobyl accident that has formed over the years. Numerous comprehensive international studies have been performed at the Ignalina NPP. After the Chernobyl accident many steps have been taken to improve the safety of the Ignalina NPP. The introduced changes guaranteed that the void coefficient remained negative in all possible circumstances. The Ignalina NPP is intensively preparing for licensing of unit 1

  20. Replacement of the computerized control system at NPP under operation

    International Nuclear Information System (INIS)

    Ermolaev, A.D.; Rakitin, I.D.

    1985-01-01

    Reasons and preconditions for replacement of the computerized control systems (CCS) at NPP under operation are consi-- dered. Problems dealing with management of CCS replacement, maintenance of a new CCS as well as NPP personnel training for the new system maintenance are discussed. A necessity of NPP personnel participation in these works in order to adapt CCS to requirements of NPP operation personnel and to initiate the training process is underlined. Replacement of CCS at NPP under operation is associated, as a rule, with obsolescence of old systems not ensuring growing requirements to NPP workability and safety. Principles observed at CCS replacement are reduced, mainly, to the following; maximum utilizatian of existing equipment, metal strUctures, cables, instruments, power supplies, ventilation system minimum of construction works and new communications; the least change of acting panels and boxes; changes in control desks should be introduced on the basis of the analysis of operator actions '

  1. Validation of MCNP NPP Activation Simulations for Decommissioning Studies by Analysis of NPP Neutron Activation Foil Measurement Campaigns

    Directory of Open Access Journals (Sweden)

    Volmert Ben

    2016-01-01

    Full Text Available In this paper, an overview of the Swiss Nuclear Power Plant (NPP activation methodology is presented and the work towards its validation by in-situ NPP foil irradiation campaigns is outlined. Nuclear Research and consultancy Group (NRG in The Netherlands has been given the task of performing the corresponding neutron metrology. For this purpose, small Aluminium boxes containing a set of circular-shaped neutron activation foils have been prepared. After being irradiated for one complete reactor cycle, the sets have been successfully retrieved, followed by gamma-spectrometric measurements of the individual foils at NRG. Along with the individual activities of the foils, the reaction rates and thermal, intermediate and fast neutron fluence rates at the foil locations have been determined. These determinations include appropriate corrections for gamma self-absorption and neutron self-shielding as well as corresponding measurement uncertainties. The comparison of the NPP Monte Carlo calculations with the results of the foil measurements is done by using an individual generic MCNP model functioning as an interface and allowing the simulation of individual foil activation by predetermined neutron spectra. To summarize, the comparison between calculation and measurement serve as a sound validation of the Swiss NPP activation methodology by demonstrating a satisfying agreement between measurement and calculation. Finally, the validation offers a chance for further improvements of the existing NPP models by ensuing calibration and/or modelling optimizations for key components and structures.

  2. Principles of Defense-in-depth philosophy applied in NPP engineering management

    International Nuclear Information System (INIS)

    Wu Guangwei

    2011-01-01

    Based on the Defense-in-depth Concept in nuclear and radiation safety, Defense-in-depth Concept for design management of Nuclear Power Plant (NPP) is developed in this paper to analyze the feasibility and importance of the application of the basic principle: Defense-in-depth concept in NPP systems performed during the design control of NPP. This paper focuses on the NPP engineering management process, and according to the analysis of such process, 5 principles of Defense-in-depth Concept applied in NPP design management are raised: (1) preventing the non-conformities of design via effective design quality management system; (2) discovering and correcting non-conformities of design quality in time via design checkup and design review meeting; (3) carrying out timely analysis and treatment against design non-conformities which have been transferred to construction phase; (4) Assessing and judging the severe non-conformities in construction phase, putting forward treatment opinions and remedies accordingly so as to avoid the existence of such non-conformities in physical construction of NPP; (5) Paying 'return-visit' and performing 'post-assessment' for NPP design to assess the designed functions and safety of NPP comprehensively. (author)

  3. Planning and management support for NPP personnel SAT-based training programmes

    International Nuclear Information System (INIS)

    Ziakova, M.

    1998-01-01

    This paper deals with planning and management support for NPP personnel SAT based training programmes based on IAEA TC Project SLR/0/003 on upgrading NPP personnel training, with the aim of upgrading NPP safety and reliability of NPP operation and maintenance. The costs needed include both Slovak and IAEA sources. Five stages of the Project are defined: planning; organizing; motivating; implementation; control, review and accountability

  4. Current technological trends in development of NPP systems

    International Nuclear Information System (INIS)

    Florescu, Gheorghe; Panaitescu, Valeriu

    2010-01-01

    The recent nuclear research issues look for new technologies and continuous progress in finding different and efficient solutions for sustained and upraising energy demand. The trend of increasing energy consumption and occurring of new and large consumers, especially from Asian countries, imposes finding of new means for clean, large scale and sustained energy production. NPPs availability was continuously monitored and improved; at the same time the safety of the nuclear energy production was under surveillance. The present development of the new technologies, the discoveries of new materials and development of efficient technological processes offer the opportunities for their appropriate implementation and use in the NPP system configurations and functioning/operation. The new technologies and scientific discoveries, and also the international cooperation, offer the opportunities to mitigate the actual barriers in order to cumulate and use advanced energy production, to find new energy sources and to build improved, reliable and safe power plants. The monitoring systems, intelligent sensors and SSCs, nanotechnologies and new/intelligent materials constitute the main ways for improvement of the NPP systems configuration and processes. The paper presents: - The state of the art in the level of the currently applied technologies for nuclear power systems development; - The actual technological limits that need to be over passed for improving the NPP systems ; - The main systems that need improvement and reconfiguration for development of currently operating NPPs as well as raising the operation efficiency, availability and total safety; - The actual energy production issues; - The key arguments in sustaining the R and D new NPP systems development; - Future trends in NPP development; - The limitations in industrial processes knowledge and use. Appropriate R and D in the field of NPP systems have specific characteristics that were considered in paper completion

  5. Summary of NPP personnel training in Czech Republic

    International Nuclear Information System (INIS)

    1996-01-01

    The preparation of NPP personnel is one of the most important phases of the process of construction, commissioning, operation and maintenance of nuclear power facilities. The objective is to improve personnel abilities so that they would be able to assure reliable, safe and economic operation of these facilities with high investment costs. It is the purpose of Nuclear Training Centre Brno (NTC Brno) to provide training and services which are responsive to the technological demands and emerging educational standards and criteria of the NPP and the nuclear industry. Fulfilling this purpose is a challenging task. The staff of NTC Brno, in a joint effort with NPP Dukovany and NPP Temelin, has responded to the challenge with comprehensive programs aimed at meeting customers needs. The programs are broadly based, yet flexible so that they can incorporate specific customer requirements

  6. Emergency preparedness at Barsebaeck NPP in Sweden

    International Nuclear Information System (INIS)

    Olsson, R.; Lindvall, C.

    1998-01-01

    On-site emergency preparedness plan at Barsebaeck NPP is presented. In an emergency the responsibility of the NPP is to alarm the emergency organizations, spend all efforts to restore safe operation, assess the potential source term as to size and time, protect their own personnel, inform personnel and public. Detailed emergency procedures overview is provided

  7. Jose Cabrera NPP severe accident management activities

    International Nuclear Information System (INIS)

    Blanco, J.; Almeida, P.; Saiz, J.; Sastre, J.L.; Delgado, R.

    1998-01-01

    To prepare a common acting plan with respect to Severe Accident Management, in 1994 was founded the severe accident management ''ad-hoc'' working group from the Spanish Westinghouse PWR Nuclear Power Plant Owners Group. In this group actively collaborated the Jose Cabrera NPP Training Centre and the Department of Nuclear Engineering of UNION FENOSA. From this moment, Jose Cabrera NPP began the planning of its specific Severe Accident Management Program, which main point are Severe Accident Management Guidelines (SAMG). To elaborate this guidelines, the Spanish translation of Westinghouse Owners Group (WOG) Severe Accident Management Guidelines were considered the reference documents. The implementation of this Guidelines to Jose Cabrera NPP started on January 1997. Once the specific guidelines have been implemented to the plant, training activities for the personnel involved in severe accident issues will be developed. To prepare the training exercises MAAP4 code will be used, and with this intention, a specific Jose Cabrera NPP MAAP-GRAAPH screen has been developed. Furthermore, a wide selection of MAAP input files for the simulation of different scenarios and accidental events is available. (Author)

  8. Feasibility studies for decommissioning

    International Nuclear Information System (INIS)

    Hladky, E.

    2000-01-01

    In this presentation author deals with planning of decommission of the NPPs A1, V1 and V2 Bohunice and Mochovce. It was concluded that: Used model for decommissioning parameters assessment has been suitable for elaboration of initial decommissioning plans (feasibility studies); Basic assessment of main decommissioning parameters and basic comparison of various decommissioning options have been possible; Improvement of the model and corresponding software is desirable and works on software improvement began one year ago; V1-NPP initial decommissioning plan should be actualized, because initial decommissioning plan does not correspond by its content and structure to requirements of Act No. 130/98 and Nuclear Regulatory Authority Degree No. 246/99; Strategy of radioactive wastes treatment and conditioning together with technical provisions at Jaslovske Bohunice site was changed in comparison with the assumptions in 1991-92; Considered V1 NPP decommissioning options are necessary to be re-evaluated in accordance with latest development of knowledge and approaches to NPP decommissioning in the world; Specific unit costs are substantially and differentially changed in comparison with the assumptions in 1991-92; Necessity to take into account technical changes resulted from V1 NPP reconstruction. (author)

  9. The Slovaks support completion of MO34

    International Nuclear Information System (INIS)

    Holy, R.

    2007-01-01

    This year (2007) in March a reputable international agency GfK conducted a poll, which was focused primarily on the questions relating to the presence and future of nuclear energy sector in Slovakia as well as brand awareness of Slovenske elektrarne. It results from the poll that 2/3 of Slovak population is not against the completion of Units 3 and 4 of Mochovce NPP (EMO34), and this relates to as much as 87 % of the asked in the region within a 10 km distance from EMO! (author)

  10. Transition cycle fuel management problems of NPP Krsko

    International Nuclear Information System (INIS)

    Petrovic, B.; Pevec, D.; Smuc, T.; Urli, N.

    1989-01-01

    Transition cycle fuel management problems are described and illustrated using results and experience attained during core reload design of NPP Krsko. Improved version of computer code package PSU-LEOPARD/Mcrac is successfully applied to NPP Krsko loading pattern design. (author)

  11. On the NPP structural reliability

    International Nuclear Information System (INIS)

    Klemin, A.I.; Polyakov, E.F.

    1980-01-01

    Reviewed are the main statements peculiarities and possibilities of the first branch guiding technical material (GTM) ''The methods of calculation of structural reliability of NPP and its systems at the stage of projecting''. It is stated, that in GTM presented are recomendations on the calculation of reliability of such specific systems, as the system of the reactor control and protection the system of measuring instruments and automatics and safe systems. GTM are based on analytical methods of modern theory of realibility with the Use of metodology of minimal cross sections of complex systems. It is stressed, that the calculations on the proposed methods permit to calculate a wide complex of reliability parameters, reflecting separately or together prorerties of NPP dependability and maintainability. For NPP, operating by a variable schedule of leading, aditionally considered are parameters, characterizing reliability with account of the proposed regime of power change, i.e. taking into account failures, caused by decrease of the obtained power lower, than the reguired or increase of the required power higher, than the obtained

  12. Technical and economical problems of decommissioning nuclear power plants (NPP) in Russia

    International Nuclear Information System (INIS)

    Vaneev, M.

    2001-01-01

    The introduction per new century has brought to atomic Engineering many new problems. One of them, which has got a serious urgency, we now shall consider. It is a problem of decommissioning NPP in Russia. By 2014 all maintained nowadays NPP in Russian Federation will develop the regular service life. And all of them on idea should be removed from operation. But, as we understand, in today's difficult economic conditions, to it NPP the procedure of prolongation of service life will be applied, and where it is impossible by virtue of the various reasons, the procedure of translation NPP in nuclear - safe condition and in a mode of a long storage under supervision, before acceptance of the decision about a method and way of financing of a decommissioning will be applied. Possible the following variants will be: use platforms of the old NPP for construction new NPP, or using as burial place NPP. The variant of a decommissioning up to a condition 'green grass' is represented unprofitable because of its dearness. The similar decommissioning was carried out in Japan. Was removed from operation research reactor of a type WWR. The expenses for this method of a decommissioning considerably surpass expenses for a method of a burial place NPP basically because of high cost of dismantle and transportation in long-term storehouses of the 1 contour equipment. The most urgent problem of decommissioning NPP, which developed their regular service life - is financing this final stage of a exploitation cycle of the block. I shall remind, that the financing is carried out from uniform fund of decommissioning. The formation of this fund occurs by deduction 1.3 % of cost of the put electric power to the consumers by all maintained NPP of Russia. The expenditure of this fund is carried on time on some tens years. They are spent for 3 basic stages: preparation to decommissioning NPP, long endurance under supervision, dismantle and burial the NPP equipment. Nowadays on faculty NPP MPEI

  13. Unit Commissioning of “Belene” NPP (Bulgaria)

    International Nuclear Information System (INIS)

    2009-01-01

    This presentations gives detailed information about the following topics about commissioning: principles of NPP commissioning; phases of NPP commissioning; organization of commissioning activities; duties and responsibilities of the parties for carrying out unit commissioning activities; responsibility and obligations of the sides during commissioning of power unit; documentation required for power unit commissioning; quality assurance for commissioning activities

  14. Constructive approaches to the space NPP designing

    International Nuclear Information System (INIS)

    Eremin, A.G.; Korobkov, L.S.; Matveev, A.V.; Trukhanov, Yu.L.; Pyshko, A.P.

    2000-01-01

    An example of designing a space NPP intended for power supply of telecommunication satellite is considered. It is shown that the designing approach based on the introduction of a leading criterion and dividing the design problems in two independent groups (reactor with radiation shield and equipment module) permits to develop the optimal design of a space NPP [ru

  15. Chernobyl NPP accident. Overcoming experience. Acquired lessons

    International Nuclear Information System (INIS)

    Nosovskij, A.V.; Vasil'chenko, V.N.; Klyuchnikov, A.A.; Prister, B.S.

    2006-01-01

    This book is devoted to the 20 anniversary of accident on the Chernobyl NPP unit 4. History of construction, causes of the accident and its consequences, actions for its mitigation are described. Modern situation with Chernobyl NPP decommissioning and transferring of 'Ukryttya' shelter into ecologically safe system are mentioned. The future of Chernobyl site and exclusion zone was discussed

  16. Sitting Safety Aspects of Second Romanian NPP

    International Nuclear Information System (INIS)

    Mauna, T.

    2010-01-01

    The first Romanian NPP CANDU 6 type reactor gone to erection in 1980 on Cernavoda site planned to have 5 units like the Wolsong applied design project for nuclear island. For the BOP parts the ASALDO-GE project was applied with the careful about the interface connection NSP requirements. The new NPP sitting studies began from 1982 in a serious manner as first part on Nuclear Power Plant Romanian Program adopted by political and governmental authorities at the time. For develop the all package of the studies in concordance with the first IAEA Safety Standards recommendations. Till the 1982 the first mission of design and research multi-branch of specialists team was to adapt the NPP Cernavoda project having a open water cooling circuit to the new parameters of close water cooling circuit. But the team was looking at the other type of NPP for sitting. Also in the same time was studied the possibility of NSP foundation on hard less or soft soil foundation strata in connection with safety aspects. The close circuit of cooling water means others parameters of systems and need very large cooling towers. Also must be reconsidering the safety systems design and performance as new solution. In the south of Transylvania historical region in Romania the Olt River run from west to east having medium multi annual flow around 70 m3/s. The Olt River has a chain of small hydropower in operation and other planned. From geological and geophysical points of view two main faults, along the Olt river valley, one of this having seismically small activities was detected. Site region geotechnical studies show small quantity underground natural gas, salt and peat. The initial nuclear program has imposed 4 NPP units site near Olt River. Taking into account the orogenesis, water cooling needs and other local feature can't be built more than two NPP units on a site. This paper tries to reconsider the old analysis from the last IAEA Safety Standards point of view taking into account the new

  17. Considerations related to Cernavoda NPP lifetime management

    International Nuclear Information System (INIS)

    Cojan, Mihail

    2007-01-01

    Cernavoda NPP, the first CANDU in Europe, is one of the original CANDU 6 plants and the first CANDU 6 producing over 706 MWe. While the first series of CANDU 6 plants (which entered service in the early 1980 s) have now reached the 2/3 of their 30 years design life, the Cernavoda NPP was put into service on the 2nd December 1996. After 10 years of operation the Plant Life Management (PLiM) Program for Cernavoda should be an increasingly important program to Utility ('CNE - Prod') in order to protect the investment and the continued success of plant operation. The goal of the paper is to present some considerations related to Cernavoda NPP lifetime management. The Plant Life Management Program, known as PLiM Program is concerned with the analysis of technical limits of the safe operation - from the point of view of nuclear safety - in NPP units, aiming at attaining the planned 30 years life duration and its extension to 40 or even 50 years of safe and economical operation. For the CANDU reactors the so-called PLiM and PLEX Programs are just applied. These are applied research programs that approach with priority the current practices for assessing the capability of safe operation within the limits of nuclear safety (fitness-for-service assessment). These programs also approach inspection, monitoring are prevention of degrading due to the ageing of critical systems, structures and components (CSSCs). As each nuclear plant is somewhat different in its components and systems, materials composition, procurement, construction, and operational history, directed research and development programs into materials behavior, monitoring techniques, and methods to mitigate ageing are required to support the lifetime management. Over the past 6 years, INR Pitesti (Institute for Nuclear Research - Romania) has been working on R and D Programs to support a comprehensive and integrated Cernavoda NPP Life Management Program (PLiM) that will see the Cernavoda NPP successfully and

  18. Radiation protection in Bohunice NPP. Description of present status

    International Nuclear Information System (INIS)

    Dobis, L.

    2001-01-01

    Radiation protection (RP) at Bohunice NPP has reached the high international standard. The fact was approved by several independent international missions (OSART , WANO, WENRA, ...). A lot of modifications have been done in order to improve the standard of radiation protection. All the BSS requirements have been implemented into the plant regulations before the State Law No 290/1996 and 470/2000 came into the force. Internal audits are regularly performed at NPP in order to reveal potential deficiencies. In 2001 there were 4 such audits focused on quality assurance, software operation, LBB concept and limits and condition of safe operation. State Health Institute, the regulatory body in the radiation protection, performs the inspection at least ones a month. Good relationship with the inspectors of State Health Institute also contributes to the safe operation of the NPP. There were not any radiation accident. All anomalies or radiation events are investigated at a plant level. The results of root cause analysis and proposal of corrective actions are provided to IAEA and WANO databases for the distribution. The Radiation protection department of Bohunice NPP cooperates with the other Czech and Slovak NPPs. Regular meetings on radiation protection and lately also on emergency preparedness are organized. The cooperation is excellent. Occupational exposure is reviewed also with respect of ISOE data. Bohunice NPP (even with high dose burden caused by reconstruction of V1 NPP) can be found in the first half of world PWR speaking about the collective exposure per reactor. V2 NPP itself reaches the lowest collective exposure in the world. All doses are below the limits and kept ALARA. ALARA system has been established already in 1997 at Bohunice NPP and its results are obvious for example looking at dose results during the reconstruction works at V1 NPP. The operation of Bohunice NPP has negligible influence to its surroundings. The values of gas and liquid effluents move

  19. Plant level of automated control system at a NPP with RBMK reactor

    International Nuclear Information System (INIS)

    Vorob'ev, V.P.; Gorbunov, V.P.; Dmitriev, V.M.; Litvin, A.S.

    1987-01-01

    The functional structure of plant level automated control system (ACS) at NPP with RBMK-1000 reactors, its binding with the on-line control system of higher and lower levels, as well as engineering requirements to software and recommendations on composition of hardware components, are considered. NPP ACS is an organizational-engineering system consisting of computer facilities and binding aimed at solving management, economical, organizational and physical-engineering problems to control NPP more effectively. The system carries out data acquisition, preliminary processing, analysis, transmission and representation for users to accept solutions for NPP operation by operative and management personnel. The main aim of integrated NPP ACS is the control development and increase of NPP economical efficiency, the increase of electric and heat energy production, the optimization of the production distribution between units, the development of production and economic NPP control

  20. Modernization and safety improvement project of the NPP V-2 Jaslovske Bohunice

    International Nuclear Information System (INIS)

    Michal, V.; Losonsky, B.; Magdolen, J.

    2000-01-01

    This contribution deals with the form, present state, and results of the Nuclear Power Plants Research Institute (the Slovak acronym is VUJE - Vyskumny Ustav Jadrovych Elektrarni) participation in the NPP V-2 Jaslovske Bohunice Modernization and Safety Improvement Project. A short description of VUJE history, activity, and results is also presented as well as NPPs Jaslovske Bohunice characterization. VUJE was established in 1977 and deals with scientific and research needs of nuclear power plants, such as design, construction, commissioning and operation. The next fields of VUJE activity are, NPP reconstruction, NPP personnel training, radioactive waste management technology, and NPP decommissioning. The nuclear power plant, Jaslovske Bohunice, is situated approximately 15 km from the district town of Trnava in the southwestern region of the Slovak Republic. The construction of the first Czechoslovak NPP A-1 began on this site in 1957 .The construction of the double-unit NPP V-1 with WWER-440 (type V-230) reactor began in 1972. The first unit of NPP V-1 began operation in 1978 and the second in 1980. NPPs construction on the Bohunice site continued with NPP V-2, which has two units with WWER-440 (type V-213) reactors. Unit 1 and Unit 2 of NPP V-2 were commissioned in 1984 and 1985, respectively. Slovak electric utility Slovenske elektrarne (SE) is the owner/commissioner of NPP V-2. This NPP is responsible for more than 20% of the total electrical energy production of SE, making it an essential supporter of the Slovak economy. (authors)

  1. Using the digital reactor control systems at NPP

    International Nuclear Information System (INIS)

    Schirl, G.; Hertel, J.

    2006-01-01

    A conception of application of the digital reactor control systems (RCS) at NPP is presented. The digital RCS architecture and safety ensuring are considered. The strategy and algorithm of the operating NPP equipping with the new digital RCS are given too [ru

  2. Radioactive wastes management of NPP

    International Nuclear Information System (INIS)

    Klyuchnikov, A.A.; Pazukhin, Eh.M.; Shigera, Yu. M.; Shigera, V.Yu.

    2005-01-01

    Modern knowledge in the field of radiation waste management on example of the most serious man-made accident at Chernobyl NPP are illuminated. This nuclear power plant that after accident in 1986 became in definite aspect an experimental scientific ground, includes all variety of problems which have to be solved by NPP personnel and specialists from scientific organizations. This book is aimed for large sphere of readers. It will be useful for students, engineers, specialists and those working in the field of nuclear power, ionizing source and radiation technology use for acquiring modern experience in nuclear material management

  3. NPP construction cost in Canada

    International Nuclear Information System (INIS)

    Gorshkov, A.L.

    1988-01-01

    The structure of capital costs during NPP construction in Canada is considered. Capital costs comprise direct costs (cost of the ground and ground rights, infrastructure, reactor equipment, turbogenerators, electrotechnical equipment, auxiliary equipment), indirect costs (construction equipment and services, engineering works and management services, insurance payments, freight, training, operating expenditures), capital per cents for the period of construction and cost of heavy water storages. It proceeds from the analysis of the construction cost structure for a NPP with the CANDU reactor of unit power of 515, 740 and 880 MW, that direct costs make up on the average 62%

  4. Heat delivery from Bohunice NPP, Slovakia

    International Nuclear Information System (INIS)

    Paley, I.

    1998-01-01

    Experience with nuclear district heating in the Slovak Republic is reported. The heating system of the town of Trnava is supplied by the Bohunice NPP and conventional sources. Construction of the hot water heating system from the Bohunice NPP began in 1983. Commercial operation began on 10 December 1987. Heat delivery has gradually increased from 478 TJ in 1988, to 1,104 TJ in 1995. The heat cost is low, resulting in an increasing number of consumers. (author)

  5. Ukrainian Nuclear Society International Conference 'Modernization of the NPP with VVER reactor' (abstracts)

    International Nuclear Information System (INIS)

    Bar'yakhtar, V.G.

    1999-01-01

    Abstracts of the papers presented at International conference of the Ukrainian Nuclear Society 'Modernization of the NPP with VVER reactor'. The following problems are considered: improving the NPP's safety and reliability; reactor modernization, the lifetime prolongation; increasing of the reactor operating characteristics; methods of capacity factor increasing: refueling control, maintenance control; technical and economical aspects of NPP modernization; modernization of the automated control system of the fuel process at the NPP's; technical features and methods for the continued radiation and technology control at the NPP's; training, increasing the staff qualification and NPP modernization

  6. IAEA activities on NPP personnel training and qualification

    International Nuclear Information System (INIS)

    Kossilov, A.

    1998-01-01

    Activities of IAEA concerning training and qualification of NPP personnel consider the availability of sufficient number of competent personnel which is one of the most critical requirements for safe and reliable NPP operation and maintenance. Competence of personnel is essential for reducing the frequency of events connected to human errors and equipment failures. The IAEA Guidebook on Nuclear Power Plant Personnel Training and its Evaluation incorporates the experience gained worldwide and provides recommendations on the use of SAT being the best practice for attaining and maintaining the qualification and competence of NPP personnel and for quality assurance of training

  7. NPP Krsko on-line low pressure containment tightness monitoring implementation

    International Nuclear Information System (INIS)

    Dudas, M.; Basic, I.

    2004-01-01

    Containment Integrated Leak Rate Test (CILRT) 1999 in NPP Krsko was completely performed following regulation of 10CFR50 Appendix J Option A and ANSI/ANS 56.8-1987 at a design pressure (3.15 kp/cm2). In 2001 NPP Krsko proposed to Slovenian Nuclear Safety Administration (SNSA) the Technical Specification (TS) and Updated Safety Analysis Report (USAR) changes that describe implementation of new test intervals for Type A, B and C tests according to 10CFR50, Appendix J, Option B. After the positive final independent review of proposed changes by Authorized Institution, NPP Krsko received the License Amendment requiring from NPP Krsko to define technical solution for surveillance of containment tightness between two 10-years CILRT. This paper intends to discuss proposed methods by NPP Krsko, test equipment, performed measurements in 2004, associated analyses and evaluation.(author)

  8. Spent fuel pool risk analysis for the Dukovany NPP

    Energy Technology Data Exchange (ETDEWEB)

    Hust' ak, S.; Jaros, M.; Kubicek, J. [UJV Rez, a.s., Husinec-Rez (Czech Republic)

    2013-07-01

    UJV Rez, a.s. maintains a Living Probabilistic Safety Assessment (Living PSA) program for Dukovany Nuclear Power Plant (NPP) in the Czech Republic. This project has been established as a framework for activities related to risk assessment and to support for risk-informed decision making at this plant. The most extensively used PSA application at Dukovany NPP is risk monitoring of instantaneous (point-in-time) risk during plant operation, especially for the purpose of configuration risk management during plant scheduled outages to avoid risk significant configurations. The scope of PSA for Dukovany NPP includes also determination of a risk contribution from spent fuel pool (SFP) operation to provide recommendations for the prevention and mitigation of SFP accidents and to be applicable for configuration risk management. This paper describes the analysis of internal initiating events (IEs) in PSA for Dukovany NPP, which can contribute to the risk from SFP operation. The analysis of those IEs was done more thoroughly in the PSA for Dukovany NPP in order to be used in instantaneous risk monitoring. (orig.)

  9. Nuclear materials

    International Nuclear Information System (INIS)

    1996-01-01

    In 1998, Nuclear Regulatory Authority of the Slovak Republic (NRA SR) performed 38 inspections, 25 of them were performed in co-operation with IAEA inspectors. There is no fresh nuclear fuel at Bohunice A-1 NPP at present. Fresh fuel of Bohunice V-1 and V-2 NPPs is inspected in the fresh fuel storage.There are 327 fresh fuel assemblies in Mochovce NPP fresh fuel storage. In addition to that, are also 71 small users of nuclear materials in Slovakia. In most cases they use: covers made of depleted uranium for non-destructive works, detection of level in production plants, covers for therapeutical sources at medical facilities. In. 1995, NRA SR issued 4 new licences for nuclear material withdrawal. In the next part manipulation with nuclear materials, spent fuel stores and illegal trafficking in nuclear materials are reported

  10. Current status of Chernobyl NPP decommissioning

    International Nuclear Information System (INIS)

    2009-01-01

    Strategy of Chernobyl NPP decommissioning with the decommissioning license 2002-2064 is presented. The main activities at the stage of ChNPP units shutdown (2002 - 2012) are: units maintenance in safe state; decommissioning infrastructure construction; unloading of SNF – main activity determining the stage duration; systems and elements final shutdown; decommissioning life-support systems reconstruction; Comprehensive engineering and radiation survey (CERS); dismantling of the reactor facilities external equipment; removal of RAW from units; decommissioning documentation development. The decommissioning activities main results are presented

  11. Meeting up-to-date safety requirements in the Russian NPP projects

    International Nuclear Information System (INIS)

    Tepkyan, G. O.; Yashkin, A. V.

    2014-01-01

    Safety features in Russian NPP designs are implemented by the combination of active and passive safety systems • Russian NPP designs are in compliance with up-to-date international and European safety requirements and refer to Generation III+ • Russian state-of-the-art designs have already implemented some design solutions, which take into account “post-Fukushima” requirements. Russian NPP design principles have been approved during the European discussions in spring 2012, including the IAEA extraordinary session addressed to Fukushima NPP accident

  12. Results and development prospects for the Cernavoda NPP

    International Nuclear Information System (INIS)

    Rotaru, Ioan

    2001-01-01

    The new competitive market in the power sector offers favorable conditions for continual developing of Nuclear Power in Romania. The principal arguments in this respect are: the CANDU technology is a western technology recognized world wide both for its operation reliability and its economical performances. The results obtained by Cernavoda NPP Unit 1 over a period of four years and a half commercial operation confirms the validity of the CANDU project in Romania in the new conditions of competitive market. Accomplishing the Unit 2 of Cernavoda NPP represents for the time being one of the most cost-effective investment in the Romanian power sector. Also, the participation of the local industry to the project implementation is important as it ensures the initial heavy water and nuclear fuel charging, specific materials and equipment production, design and construction works, etc. Heaving in view all these favorable arguments, the construction of Unit 2 of Cernavoda NPP represents one of the highest priorities of the State Budget of the present administration in year 2001. The Nuclear Power Project in Romania, based on CANDU technology meets national as well as EU regulations concerning nuclear power and as such its development poses no significant problems both in the context of EU extension and in the frame of the developing competitive market in the power sector. For SNN SA the main objectives in view for the next stage are: operating Cernavoda NPP Unit 1 in conditions of highest nuclear safety and economical efficiency; finalizing the Cernavoda NPP Unit 2 and creation of an organisation for operating the two units; promoting of a functional system characteristic to the competitive market economy and open to privatization; creating opportunities for exporting electrical energy. The contribution contains the following sections: 1. General overlook; 2. Performance of the power production in the year 2000; 2.1. Unit 1 of Cernavoda NPP; 2.2. Nuclear Fuel Plant

  13. The analysis of financial risk management application for NPP project in Indonesia

    International Nuclear Information System (INIS)

    Imam Bastori; Moch Djoko Birmano

    2012-01-01

    NPP Project is one of full dynamic, risky and challenging business. Application of financial risk management t in Nuclear Power Plant (NPP) project becomes one alternative to be considered carefully. This paper explains an analysis to make a decision in the risk management application so that it can be applied in the NPP's construction in Indonesia. As case study, is NPP of conventional PWR type of class 1150 MWe. To calculate the economics and financing of NPP is used Spreadsheet INOVASI, further the decision of financial risk management were analyzed using a Model of Cash Flow Adjustment, which developed by Richard Fairchild. The analysis showed that the Method of Cash Flow Adjustment developed by Richard Fairchild is better than the method of NPV Adjustment on a NPP project, because it have included the aspects of financial risk management. NPP project can only be executed if the NPV 2 0 and decision to execute the financial risk management should be based on NPVrm > NPV. The application of financial risk management in NPP project is not needed if an insurance premium more expensive than all costs of financial distress, unless the insurance company can give discount of at least 20%. (author)

  14. Near Regional and Site Investigations of the Temelin NPP Site

    International Nuclear Information System (INIS)

    Prachar, Ivan; Vacek, Jiri; Heralecky, Pavel

    2011-01-01

    The Temelin NPP is worldwide through heated discussion with nuclear energetic opposition. In addition this discussion goes beyond a border of the Czech Republic. On the other side, results of several international supervisions shown that Temelin NPP is fully comparable with the safest nuclear power plants in the world regarding its technical design and safety functions. This presentation deals with the near regional and site investigations of the Temelin NPP Site. It must be noted that although the Temelin site is situated in the area with low seismicity, item of seismicity is a basic argument against Temelin NPP and therefore a detail seismic hazard assessment was performed

  15. Knowledge Management and Organizational Proficiency with NPP

    International Nuclear Information System (INIS)

    Marler, M.

    2016-01-01

    Full text: The pace of new NPP construction, startup, and operation is straining the supply of proficient operators, technicians, and engineers. This technical brief explains an approach implemented by a US nuclear utility to capture and transfer knowledge possessed by proficient workers to new workers using the VISION learning content management system. This approach could also be used to accelerate worker proficiency in new NPP organizations. (author

  16. Safeguards at Kozloduy NPP - Experience and expectations

    International Nuclear Information System (INIS)

    Elenkov, Todor

    2001-01-01

    Bulgaria is a party of Non Proliferation Treaty since 5 September 1969. The agreement between IAEA and Bulgaria - INFCIRC 178 - has been in force since 29 February 1972. At that time Bulgaria had one research reactor IRT-2000 in Sofia and two power reactors of WWER-440 type under construction. Now at Kozloduy NPP site there are 4 facilities, which consist of 4 WWER-440 and 2 WWER-1000 type power reactors, producing almost 50% of the electricity in Bulgaria and 1 wet away from reactor spent fuel storage. In 1991 under the green movements and social pressure, the research reactor in Sofia was closed and the construction of the second NPP in Belene with 2 WWER-1000 type reactors was halted. After the transfer in 1994 of the fresh fuel from the research reactor to Kozloduy due to security reasons practically NPP Kozloduy remains the only significant (from safeguards point of view) nuclear site in Bulgaria. In 1972 a 'Nuclear Fuel' group was formed at the Physicists Department in NPP Kozloduy with responsibilities to carry out for safeguards records and reports, fresh and spent fuel transport and control. In 1990 this group was transferred to the Safety Section and since 1992 it exists as 'Control and Accounting for of the Nuclear Materials' - a section in the Safety Department. Currently the section serves all four facilities in NPP Kozloduy and has four people: section head, chief inspector and two inspectors. The main activities of the section include: a) Control of the nuclear fuel location as well as meeting the storage and transport conditions regulations; b) Control of the conditions for normal operations of the installed IAEA surveillance systems; c) Preparation of documents for licensing of fresh and spent nuclear fuel transport; d) Preparation of the official information on nuclear materials location and quantity; e) Preparation of accounting records and the reports for IAEA (ICR, PIL, MBR); f) Co-ordination of the IAEA safeguards inspection activities at NPP

  17. Attitude of the population and students to further construction of NPP

    International Nuclear Information System (INIS)

    Machacek, Ladislav

    1993-01-01

    This presentation shows the public opinion poll young people on NPP in the Slovakia i.e. comparative research results on Attitude of the Slovak population (1991 - a sample 1104 respondents, and Slovak students 1992 - a sample 291 respondents) to the nuclear energy and NPP; Source of information about NE and NPP, motivation of apprehensions of young people concerning NE; what meaning for young people have the arguments FOR and AGAINST construction of NPP in Slovakia; whom students from Bratislava believe during discussions about NE

  18. 50 Years of nuclear power plants in Slovakia

    International Nuclear Information System (INIS)

    Dobak, D.; Moncekova, M.; Pritrsky, R.

    2007-01-01

    The publication was prepared to celebration of semi-centennial anniversary of nuclear power plants in Slovakia and presents a free sequel of book '40 years of nuclear power plants in Slovakia'. It contains memories of the observers that are valuable and merits spreading theirs ideas. There are photos in the publication that up to now were not disclosed and that have a unique value not due to their age only. At the same time, the publication expresses an admiration, regard and acknowledgement to all who joined their life with nuclear power. This book contains the following headings: (1) Speech, Lubomir Jahnatek (Minister of Economy of the Slovak Republic); (2) Speech, Jozef Valach; (3) Speech, Paolo Ruzzini; (4) Historic aspects of A1 NPP; (5) Historic Aspects of V1 NPP; (6) Historic Aspects of V2 NPP; (7) A remembrance to Mochovce; (8) Historic Aspects of VYZ; (9) Nuclear power as an integral part of the Slovak power engineering; (10) Under control of supervision; (12) The state health regulation performance in nuclear installations; (13) JAVYS in the Slovak energy sector

  19. New trends in designing NPP control boards

    International Nuclear Information System (INIS)

    Kondrat'ev, V.V.

    1981-01-01

    A short analytical summary of the latest developments and future trends in designing NPP control boards is given. The designs of the Westinghause and the Hynkley-Point NPP control boards are described in detail. The essence of the advanced control board concept consists , firstly, in expanded use of computer-controlled displays for the sake of reducing the content of unimportant information presented to an operator, and, secondary, in better account of human possibilities to convert the NPP operation information into a more suitable form. An enlarged use of the direct digital reactor control utilizing microprocessors is expected. Besides, the employment of full-scale control board mock-ups and information desks as well as testing newly-developed control boards at computer reactor simulators are concluded to be used at all-growing rate [ru

  20. Some problems of NPP construction base improvement

    International Nuclear Information System (INIS)

    Movchan, S.V.

    1984-01-01

    NPP construction bases are characterized by high cost of construction and large area. Duration of base construction makes up 3-4 years, labour contents for their erection constitute 600-900 thousand man-days. Delays in organizing functional base services essentially decelerate construction rates of the main NPP buildings. Maximum joining of separate buildings by their functional assignment and structural peculiarities, wide application of container buildings, partial utilization of permanent buildings of production centre for construction needs; transition to new organizational form of construction based on industrial production of buildings; production of volumetric structural-technological cells with mounted equipment manufactured at specialized plants, mounting NPP components with stock produced cells, consideration of the problem of large power centre creation are necessary for reduction of construction centres, area reduction of cost and duration of their construction

  1. Qinshan NPP large break LOCA safety analysis

    International Nuclear Information System (INIS)

    Shi Guobao; Tang Jiahuan; Zhou Quanfu; Wang Yangding

    1997-01-01

    Qinshan NPP is the first nuclear power plant in the mainland of China, a 300 MW(e) two-loop PWR. Large break LOCA is the design-basis accident of Qinshan NPP. Based on available computer codes, the own analysis method which complies with Appendix k of 10 CFR 50 has been established. The RELAP4/MOD7 code is employed for the calculations of blowdown, refill and reflood phase of the RCS respectively. The CONTEMPT-LT/028 code is used for the containment pressure and temperature analysis. The temperature transient in the hot rod is calculated using the FRAP-6T code. Conservative initial and functional assumptions were adopted during Qinshan NPP large break LOCA analysis. The results of the analysis show the applicable acceptance criteria for the loss-of-coolant accident are met

  2. Construction of large-thickness sand cushions for NPP foundations

    International Nuclear Information System (INIS)

    Krantsfel'd, Ya.L.; Losievskaya, I.K.; Kovalenko, R.P.; Mutalipov, A.

    1982-01-01

    A study is made on some technological peculiarities of preparation of NPP foundations and control methods of foundation density. As an example the experience of cement-sand foundation construction for two 900 MW power-units at the Koeberg South Africa NPP is briefly described. The experience of artificial foundation construction at this NPP indicates both the possibility of obtaining the required quality of cement-sand cushions and commercial construction of large volume of such cushions by acceptable rates and the necessity of unification of work quality characteristics

  3. Project No. 7 - Decommissioning unit at Ignalina NPP. (Engineering and project management)

    International Nuclear Information System (INIS)

    2000-01-01

    In order to manage decommissioning process at Ignalina NPP, a new unit should be established in the framework of the Ignalina NPP organizational structure. The on-site Engineering Project Management Unit (PMU) will adopt an integrated approach to project management , engineering design, planning, procurement, safety and licensing activities at Ignalina NPP site. The PMU will assist the Ignalina NPP management in the development of an integrated decommissioning and waste management strategy

  4. Procedure for Application of Software Reliability Growth Models to NPP PSA

    International Nuclear Information System (INIS)

    Son, Han Seong; Kang, Hyun Gook; Chang, Seung Cheol

    2009-01-01

    As the use of software increases at nuclear power plants (NPPs), the necessity for including software reliability and/or safety into the NPP Probabilistic Safety Assessment (PSA) rises. This work proposes an application procedure of software reliability growth models (RGMs), which are most widely used to quantify software reliability, to NPP PSA. Through the proposed procedure, it can be determined if a software reliability growth model can be applied to the NPP PSA before its real application. The procedure proposed in this work is expected to be very helpful for incorporating software into NPP PSA

  5. Ignalina NPP Safety Analysis: Models and Results

    International Nuclear Information System (INIS)

    Uspuras, E.

    1999-01-01

    Research directions, linked to safety assessment of the Ignalina NPP, of the scientific safety analysis group are presented: Thermal-hydraulic analysis of accidents and operational transients; Thermal-hydraulic assessment of Ignalina NPP Accident Localization System and other compartments; Structural analysis of plant components, piping and other parts of Main Circulation Circuit; Assessment of RBMK-1500 reactor core and other. Models and main works carried out last year are described. (author)

  6. Radionuclide localization at the Chernobyl' NPP territory

    International Nuclear Information System (INIS)

    Mamaev, L.A.; Galkin, G.A.; Khrabrov, S.L.; Polyakov, A.S.; Mikhejkin, S.V.

    1989-01-01

    Experience is generalized of using different dust suppression (DS) compounds during Chernobyl' accident consequence elimination. Polymer DS compounds were used at the NPP operating site; the compounds kept dust-like radioactive contaminations during 1-2 months. DS at the country was realized by means of the compound on base of latex. The conclusion is made that the DS measures improved radiation situation in the NPP zone. 7 refs

  7. Preparation of Long Term Operation in Dukovany NPP, Czech Republic

    International Nuclear Information System (INIS)

    Krivanek, R.; Sabata, M.

    2012-01-01

    Dukovany NPP in the south-east of the Czech Republic operates four VVER 440/213 type units. The first unit was commissioned in 1985 and the last one in 1987. The operational results of the whole NPP have been excellent and NPP permanently belongs between the first quartile of the best operated NPPs in the world in accordance with WANO factors. Large safety improvement programme have been implemented in last 15 years. The original design lifetime of main components is 30 years which means till 2015 and it is understandable that NPP is preparing for long-term operation (LTO). The paper is describing activities carried out and planned for safe and successful LTO. (author)

  8. Low-water considerations for NPP sites

    International Nuclear Information System (INIS)

    Jensen, J.; Frank, T.; Wahl, T.

    2009-01-01

    In the frame of reactor safety considerations flood protection and the evaluation of low-water events are safety relevant issues. Therefore low-water statistics were performed for the coastal region Cuxhaven and the Elbe river estuary. The consideration of the longitudinal profile of water levels during low-tide in connection with surface water effects, morphodynamic changes of the river and anthropogenic modifications is of importance for conclusions concerning the NPP sites in some distance of the reference tide gauge. The authors performed a statistical low-tide analysis for the NPP sites Brunsbuettel and Brokdorf.

  9. NPP Krsko natural circulation performance evaluation

    International Nuclear Information System (INIS)

    Segon, Velimir; Bajs, Tomislav; Frogheri, Monica

    1999-01-01

    The present document deals with an evaluation of the natural circulation performance of the Krsko nuclear power plant. Two calculation have been performed using the NPP Krsko nodalization (both similar to the LOBI A2-77 natural circulation experiment) - the first with the present steam generators at NPP Krsko (Westinghouse, 18% plugged), the second with the future steam generators (Siemens, 0% plugged). The results were evaluated using the natural circulation flow map derived in /1/, and were compared to evaluate the influence of the new steam generators on the natural circulation performance. (author)

  10. The Modernization Program and Power Up-rate at NPP V2 Jaslovske Bohunice, Slovak Republic

    International Nuclear Information System (INIS)

    Reznik, Vladivoj; Krajmer, Imrich

    2010-01-01

    Slovenske Elektrarne, a.s. is a second largest utility company in the Central and Eastern Europe that owns an optimal production portfolio comprised of nuclear, thermal and hydroelectric power plants. There are two nuclear power plants Bohunice and Mochovce both operate with two units and another two units Mochovce 3 and 4 are currently under construction. Electricity at Nuclear power plant Bohunice V2 is generated by two 440 MW units that had gradually been connected to the power network over the period between 1984 and 1985. In the construction of the nuclear power plant V2 the concept of pressurized water reactors was adopted and the Soviet-era design WWER 440 used. The upgrading of Nuclear Power Plant Bohunice V2 is based on three main points: Modernization, Power up-rate, and Ageing monitoring program. The main targets of the modernization project were: Increasing of the Nuclear Safety and of the Nuclear operational reliability, and Seismic improvement. This modernization program is in full compliance with IAEA requirements and with the decisions from the Nuclear Regulatory Agency of the Slovak Republic (UJD) and achievement of the probabilistic safety criteria in accordance with IAEA recommendations. Except that is ensured a safe, reliable, economical and effective electricity and heat generation. Achieved results are based for further prolongation of the operation life time up to 60 years. (authors)

  11. Training human resource for NPP in Vietnam

    International Nuclear Information System (INIS)

    Nguyen, Trung Tinh; Dam, Xuan Hiep

    2008-01-01

    Vietnam will establish the first NPP in the near future. With us the first important thing is the human resource, but now there is no university in Vietnam training nuclear engineers. In EPU (Electric Power University), now we are preparing for training nuclear engineers. In this paper, we review the nuclear man power and the way to train the high quality human resource for NPP and for other nuclear application in Vietnam. (author)

  12. Russian normative approach to the question of management of NPP life time

    International Nuclear Information System (INIS)

    Karpunin, N.I.

    2002-01-01

    Full text: In Russia, the designated service life of a nuclear power plant (NPP) is 30 years. During the period 2001-2010, 15 Russian NPP units will reach the end of their service life. The 'Basic Provisions of NPP Safety Assurance', OPB-88/97, Item 5.1.14, provide for a possible extension of NPP operation beyond the designated service life. For such an extension, the NPP operating organization must apply for a license renewal to Gosatomnadzor, which needs to specify the relevant requirements. GAN is developing regulatory documents to provide a basis for NPP license renewal/extension of NPP operation, which would benefit from international experience. In accordance with 'The program of Atomic Energy Development in the Russian Federation for 1998-2005 and up to 2010' adopted by Decree No. 815 of the Government of the Russian Federation on 21 July 1998, priority is placed on the preparation of NPPs for extension of service life and on ensuring safety in the extended operating period. The length of the extension beyond the designated service life is to be determined on the basis of a range of technical and economic considerations, including: The ability to ensure and maintain operational safety; Sufficient residual service life of the unit's non-repairable components; The availability of temporary storage facilities for the additional spent nuclear fuel and radioactive waste, or the possibility of its transport off-site; The ability to ensure safe handling of the radioactive waste generated during the extension period; To extend the lifetime of an NPP unit, the plant Operator is required to perform the following tasks: Carry out a comprehensive survey of the NPP unit; Draw up a programme of preparation for lifetime extension; Prepare the NPP unit for operation in the extended period; Carry out the necessary tests. There are also some normative documents, which regulate management of NPP life time. (author)

  13. Observation and modeling of NPP for Pinus elliottii plantation in subtropical China

    Institute of Scientific and Technical Information of China (English)

    2008-01-01

    Based on the stem analysis of 59 individuals of Pinus elliottii in combination with tree biomass models, we calculated annual biomass increment of forest plots at Qianyanzhou Ecological Station, Chinese Academy of Sciences in subtropical China. In addition, canopy layer and community NPP were calcu- lated based on 12 years’ litter fall data. NPP of the 21-year-old forest was estimated by using the BIOME BGC model; and both measured NPP and estimated NPP were compared with flux data. Community biomass was 10574 g·m-2; its distribution patterns in tree layer, shrub layer, herbaceous layer, tree root, herbaceous and shrub roots and fine roots were 7542, 480, 239, 1810, 230, 274 and 239 g·m-2, respectively. From 1999 to 2004, the average annual growth rate and litter fall were 741 g·m-2·a-1 (381.31 gC·m-2·a-1) and 849 g·m?2·a?1 (463 gC·m-2·a-1), respectively. There was a significant corre- lation between annual litter fall and annual biomass increment; and the litter fall was 1.19 times the biomass increment of living trees. From 1985 to 2005, average NPP and GPP values based on BGC modeling were 630.88 (343.31 - 906.42 gC·m-2·a-1) and 1 800 gC·m-2·a-1 (1351.62 - 2318.26 gC·m-2·a-1). Regression analysis showed a linear relationship (R2=0.48) between the measured and simulated tree layer NPP values. NPP accounted for 30.2% (25.6%-32.9%) of GPP, while NEP ac- counted for 57.5% (48.1%-66.5%) of tree-layer NPP and 41.74% (37%-52%) of stand NPP. Soil respi- ration accounted for 77.0% of measured tree NPP and 55.9% of the measured stand NPP. NEE based on eddy covariance method was 12.97% higher than the observed NEP.

  14. The Bohunice NPP V-1 units nuclear safety upgrading

    International Nuclear Information System (INIS)

    Mlcuch, M.

    2000-01-01

    Safety upgrading and operational reliability improvement was carried out by the Bohunice NPP V-1 staff continuously since the plant commissioning. By now, more than 1200 minor or major modifications have been implemented, either by the NPP maintenance staff or by the contractors. Based on findings of safety assessment missions invited by Bohunice NPP in 1990 - 1991, the Czecho-slovak Nuclear Regulatory Authority (CSKAE) issued the decision No. 5/91 of 81 safety upgrading measures to be taken in different areas. These improvements are referred to as the 'Small Reconstruction of the Bohunice V-1 NPP'. Realization of measures during Small reconstruction of the Bohunice NPP V-1 became a power plant, which further operation is acceptable from safety point of view, but it is also necessary further safety improvement. During the period of the Small Reconstruction the development of a Safety Report for the Gradual reconstruction has been completed. Based on this report the SR Nuclear Regulatory Authority issued the Decision No. 1/94, in which requires 59 upgrading measures in different areas to be addressed. The development of Basic Engineering of the Gradual Reconstruction has been contracted to the Siemens AG. Implementation of safety measures are provided through contract with the consortium REKON (which consists of Siemens AG company and Nuclear Power Plants Research Institute Trnava) and other Czech, Russian and Slovak companies. The Gradual Reconstruction of Bohunice NPP V-1 will be finished in 2000. By implementation of the measures carried out during Gradual Reconstruction achievement of an internationally acceptable nuclear safety level will be reached. (author)

  15. To the problem of reliability standardization in computer-aided manufacturing at NPP units

    International Nuclear Information System (INIS)

    Yastrebenetskij, M.A.; Shvyryaev, Yu.V.; Spektor, L.I.; Nikonenko, I.V.

    1989-01-01

    The problems of reliability standardization in computer-aided manufacturing of NPP units considering the following approaches: computer-aided manufacturing of NPP units as a part of automated technological complex; computer-aided manufacturing of NPP units as multi-functional system, are analyzed. Selection of the composition of reliability indeces for computer-aided manufacturing of NPP units for each of the approaches considered is substantiated

  16. New appraisement of siting for a NPP on Mures river

    International Nuclear Information System (INIS)

    Traian Mauna

    2010-01-01

    The studies for a second NPP siting on inner Romanian rivers began in a careful manner since 1982 as a first part of the Nuclear Power Plant Romanian Program adopted by political and governmental authorities at the time. The experience gained from Cernavoda NPP siting, the first mission of new multi-branch of specialists team was to choose new NPP sites adapting the CANDU type NPP Cernavoda project to the new parameters of close water cooling circuit and of hard less or no rock foundation strata. The new sites conditions mean a lot of changes of CANDU license and a decrease the output power supplied to the national electric grid. The studies on the Mures river as alternative site of Olt river in Transylvania region began in 1986 and were stopped after 1990. This paper tries to reconsider shortly the old analysis focused on geological and geotechnical aspects and other local sites characteristics according to the last IAEA Safety Standards taking into account also the last types of NPP generations and the number of units. (author)

  17. Revision of Krsko NPP Quality Assurance Plan

    International Nuclear Information System (INIS)

    Biscan, R.; Fifnja, I.; Kavsek, D.

    2012-01-01

    International standards from nuclear power plant operation area are being frequently upgraded and revised in accordance with the continuous improvement philosophy. This philosophy applies also to the area of Quality Assurance, which has also undergone significant improvement since the early 1950s. Besides just nuclear industry, there are also other international quality standards that are being continuously developed and revised, bringing needs for upgrades also in the nuclear application. Since the beginning of Krsko NPP construction, the overall Quality Assurance program and its applicable procedures were in place to assure that all planned and systematic actions necessary to provide adequate confidence that an item or service will satisfy given requirements to quality, are in place. The overall requirements for quality as one of the major objectives for Krsko NPP operation are also set forth in the Updated Safety Analyses Report, the document that serves as a base for operating license. During more than 30 years of Krsko NPP operation, the quality requirements and related documents were revised and upgraded in several attempts. The latest revision 6 of QD-1, Quality Assurance Plan was issued during the year 2011. The bases for the revision were: Changes of the Slovenian regulatory requirements (ZVISJV, JV5, JV9?), Changes of Krsko NPP licensing documents (USAR section 13?), SNSA inspection requirements, Changes of international standards (IAEA, ISO?), Conclusions of first PSR, Implementation of ISO standards in Krsko NPP (ISO14001, ISO17025), Changes of plant procedures, etc. One of the most obvious changes was the enlargement of the QA Plan scope to cover interdisciplinary areas defined in the plant management program MD-1, such as Safety culture, Self-assessment, Human performance, Industrial Safety etc. The attachment of the QA Plan defining relationships between certain standards was also updated to provide matrix for better correlation of requirements of

  18. The final report of the state scientific programme 'Ignalina NPP and the Environment'

    International Nuclear Information System (INIS)

    1998-03-01

    The final report of the State Scientific Programme 'Ignalina NPP and the Environment' includes the generalised research material on the after effects of Ignalina NPP operation upon natural environment and social processes. The data on changes of thermal state and water balance of lake Drukshiai; the effect of permanent thermal and chemical pollution on the water chemical composition and hydrochemical regime; the geochemical - contaminated state; the condition, dynamics and changes of hydrobiont communities in lake Drukshiai; the bio indication of ecological effects; the toxic and genotoxic influence of Ignalina NPP waste waters and lake Drukshiai water as well as bottom sediments; the state and dynamic of landscape ecosystem components of Ignalina NPP region; the radionuclides in Ignalina NPP area, the medical and biological studies in the Ignalina NPP influence population zone; the impact of Ignalina NPP on social territorial processes in the region are presented. Radioecological and ecotoxilogical state of Ignalina NPP region and lake Drukshiai is estimated as well as changes in lake Drukshiai and Ignalina NPP surrounding area ecosystems under the combine anthropogenic of the plant influence are elucidated. The final report contains the results of final report by the executors of the tasks and themes of the Programme which have been obtained since the beginning of the implementation of the Programme as well as generalising conclusions and recommendations. (author)

  19. Nuclear fuel operation at Balakovo NPP

    International Nuclear Information System (INIS)

    Morozov, A.

    2015-01-01

    The presentation addressed the positive experience of the TVS-2M assemblies implementation at Balakovo NPP in 18 month fuel cycles, at uprated power (104%) and the usage of the axial profiled Gd-rods in order to minimize the power peaking factors and linear heat rate in the upper part in some of the fuel rods. The results of the test operation of fuel rods with different claddings, made by E110M, E125 and E635M alloys at Balakovo NPP were also provided. The recently observed problem with the “white crust” on the cladding surfaces was also discussed

  20. Lifetime evaluation of Bohunice NPP components

    International Nuclear Information System (INIS)

    Kupca, L.

    2001-01-01

    The paper discuss some aspects of the main primary components lifetime evaluation program in Bohunice NPP which is performed by Nuclear Power Plant Research Institute (NPPRI) Trnava in cooperation with Bohunice and other organizations involved. Facts presented here are based on the NPPRI research report which is regularly issued after each reactor fuel campaign under conditions of project resulted from the contract between NPPRI and Bohunice NPP. For the calculations, there has been used some computer codes adapted (or made) by NPPRI and the results are just the conclusive and very brief, presented here in Tables (Figures). (authors)

  1. Experience on implementing risk-oriented in-service inspection at NPP in USA

    International Nuclear Information System (INIS)

    Grebenyuk, Yu.P.; Zaritskij, N.S.; Kovyrshin, V.G.; Kostenko, S.P.

    2001-01-01

    Experience of implementing risk-oriented in-service inspection (RIISI) of pipelines at the US NPP analyzed. RIISI processes according to the methodologies developed by Westinghouse and EPRI are described and compared. The information is addressed concerning practical matters of RIISI implementing at NPP Beaver Valley and Arkansas Nuclear One. Regulatory activity of the US NRC while implementing NRC at the US NPP. It is shown that using RIISI at NPP is aimed at improvement of examination efficiency, decreasing costs and occupational dose loads while inspecting pipelines

  2. Nuclear safety in Slovak Republic. Safety analysis reports for WWER 440 reactors

    International Nuclear Information System (INIS)

    Rohar, S.

    1999-01-01

    Implementation of nuclear power program is connected to establishment of regulatory body for safe regulation of siting, construction, operation and decommissioning of nuclear installations. Licensing being one of the most important regulatory surveillance activity is based on independent regulatory review and assessment of information on nuclear safety for particular nuclear facility. Documents required to be submitted to the regulatory body by the licensee in Slovakia for the review and assessment usually named Safety Analysis Report (SAR) are presented in detail in this paper. Current status of Safety Analysis Reports for Bohunice V-1, Bohunice V-2 and Mochovce NPP is shown

  3. Construction history and construction management

    International Nuclear Information System (INIS)

    Agh, S.

    1999-01-01

    The process of pre-design and design preparation of the Mochovce NPP as well as the construction history of the plant is highlighted, including the financing aspect and problems arising from changes in the technological and other conditions of start-up of the reactor units. The results of international audits performed to improve the level of nuclear safety and implementation of the measures suggested are also described. The milestones of the whole construction process and start-up process, the control and quality system, and the methods of control and management of the complex construction project are outlined. (author)

  4. Containment leak-tightness enhancement at VVER 440 NPPs

    International Nuclear Information System (INIS)

    Prandorfy, M.

    2001-01-01

    The hermetic compartments of VVER 440 NPPs fulfil the function of the containment used at NPPs all over the word. The purpose of the containment is to protect the NPP personal against radioactive impact as well as to prevent radioactive leakage to the environment during a lost of coolant accident. Leak-tightness enhancement in NPPs with VVER 440/213 and VVER 440/230 reactors is an important safety issue. New procedures, measures and methods were adopted at NPPs in Mochovce, J. Bohunice, Dukovany and Paks for leak identification and sealing works performed by VUEZ Levice. (authors)

  5. Containment leak-tightness enhancement at VVER 440 NPPs

    International Nuclear Information System (INIS)

    Prandorfy, M.

    2000-01-01

    The hermetic compartments of WWER 440 NPPs fulfil the function of the containment used at NPPs all over the world. The purpose of the containment is to protect the NPP personnel against radioactive impact as well as to prevent radioactive leakage to the. environ ent during a lost of coolant accident. Leak-tightness enhancement in NPPs with WWER 440/213 and WWER 440/230 reactors is an important safety issue. New procedures, measures and methods were adopted at NPPs in Mochovce, Jaslovske Bohunice, Dukovany and PAKS for leak identification and sealing works performed by VUEZ Levice. (authors)

  6. Perspectives for utilization of the experience from the electrical equipment modernization of Kozloduy NPP units 5 and 6 in case of construction of new NPP

    International Nuclear Information System (INIS)

    Bogdanov, D.

    2005-01-01

    In 2005 a governmental decision for continue the project for construction of Belene NPP was adopted. In case of start of this significant project in short terms, a good option will be to utilize the already achieved experience by the modernization program of units 5 and 6 of Kozloduy NPP. The process of construction of new NPP is associated with significant amount of engineering, civil construction works, equipment order and delivery, installation works, testing and commissioning activities. It is vital necessity to have optimal technology, strict organization for project implementation and excellent documentation. From technical point of view the experience from the modernization of units 5 and 6 of Kozloduy NPP will be very important in case of utilization of similar types of WWER 1000 units. According to the 'Feasibility study for construction of Belene NPP', the most favorable option is to accomplish the already partially constructed Unit 1 on the basis of upgraded WWER B-320 design - WWER 1000 B-392, in order to fulfill IEC 331-3A, IEC 332-3A, and of US NRC Regulatory Guide 1.70 and to construct the second unit on the basis of ASE WWER/1000 B-466. However, for any type of unit selected, the achieved experience will be an important basis. This article is focused mostly on the modernization aspects of some electrical systems of Kozloduy NPP

  7. Evaluation of the atmospheric transport modeling tools used at the Ignalina NPP

    International Nuclear Information System (INIS)

    Jasiulionis, R.

    2004-01-01

    The atmospheric transport modeling system at the Ignalina NPP is part of the radionuclide monitoring system and is designed to help associate radionuclide network signals with possible source regions. The evaluation of the Atmospheric Transport Modeling Tools Used at the Ignalina NPP was based on results published in last years. The model based on semi-empirical formulae of turbulent diffusion in the air and local meteorological data were used for calculation of concentration of radionuclides emitted through the Ignalina NPP stack. Meteorological data (wind velocity and direction as well as temperature at a height of 2 and 30 meters) were obtained from the meteorological station of the Ignalina NPP at Visaginas. Using the Hybrid Single-Particle Lagrangian Integrated Trajectory (HYSPLIT) model, trajectories of air masses transport to the Ignalina NPP region (56.55 N, 26.57 E) during 95 hours at heights of 100, 500 and 1000 m were calculated. The dispersion in the ground-level air of emissions through the Ignalina NPP stack can also be calculated using the HYSPLIT model. The data on the radionuclide activity concentrations in the air at the measurements site and results of calculation can used for the establishment of their field in the Ignalina NPP region. (author)

  8. NPP Krsko Containment Response Following Main Steam Line Break

    International Nuclear Information System (INIS)

    Spalj, S.; Grgic, D.; Cavlina, N.

    2000-01-01

    This paper presents the calculation of thermohydraulic environmental parameters (pressure and temperature) inside containment of Krsko NPP after postulated Main Steam Line Break (MSLB) accident. This analysis was done as a part of the ambient parameters specification in the frame of the NPP Krsko Equipment Qualification (EQ) project. The RELAP5/mod2 computer code was used for the determination of MSLB mass and energy release and computer code GOTHIC was used to calculate pressure and temperature profiles inside NPP Krsko containment. The analysis was performed for spectrum of break sizes to account for possible steam superheating during accidents with smaller break sizes. (author)

  9. Prospects for the NPP Krsko Radioactive Waste Management

    International Nuclear Information System (INIS)

    Knapp, A.; Levanat, I.; Saponja-Milutinovic, D.

    2016-01-01

    Croatia adopted Strategy of radioactive waste, used sources and spent fuel management in 2014, and its Law on radiological and nuclear safety was accordingly modified in 2015. The Strategy foresees (though with some flexibility) and the Law declares decidedly that Croatia will establish a Center for radioactive waste management, in which all necessary facilities for storage and subsequent disposal of the Croatian share of the NPP Krsko radioactive waste and spent fuel will be developed. However, Slovenia and Croatia have recently agreed that a long-term dry storage for spent fuel will be established on the NPP premises by the year 2019. Therefore, only the issues of low and intermediate level waste (LILW) are addressed here. In Slovenia, the LILW repository site Vrbina in Krsko municipality was officially confirmed in 2009. Based on the 2013 investment program for a silo-type disposal facility, preparation of the repository project documentation was contracted with a national engineering company in 2014. Slovenian repository concept has been developed in two variants: one for the Slovenian LILW only, and the other intended to accept the Croatian share of LILW from the NPP as well. In the summer of 2015 Slovenia for the first time made an official offer to Croatia to use Vrbina repository for that purpose. However, the Croatian Strategy also does not preclude the option of management of all LILW from the NPP in Croatia. Therefore, present plan of activities for the third revision of the NPP radioactive waste and spent fuel management program outlines hypothetically symmetrical LILW management options: all in Slovenia, or all in Croatia, or one half in each country. So, what shall it be? This paper discusses the prospects for each of the three above mentioned options. The major problem of the Slovenian disposal plan is its high cost, mostly due to high compensations to the local community, which will be hard to finance without Croatian participation. The simplest

  10. Assessment of NPP VIIRS Ocean Color Data Products: Hope and Risk

    Science.gov (United States)

    Turpie, Kevin R.; Meister, Gerhard; Eplee, Gene; Barnes, Robert A.; Franz, Bryan; Patt, Frederick S.; Robinson, Wayne d.; McClain, Charles R.

    2010-01-01

    For several years, the NASA/Goddard Space Flight Center (GSFC) NPP VIIRS Ocean Science Team (VOST) provided substantial scientific input to the NPP project regarding the use of Visible Infrared Imaging Radiometer Suite (VIIRS) to create science quality ocean color data products. This work has culminated into an assessment of the NPP project and the VIIRS instrument's capability to produce science quality Ocean Color data products. The VOST concluded that many characteristics were similar to earlier instruments, including SeaWiFS or MODIS Aqua. Though instrument performance and calibration risks do exist, it was concluded that programmatic and algorithm issues dominate concerns. Keywords: NPP, VIIRS, Ocean Color, satellite remote sensing, climate data record.

  11. The Ignalina NPP and Y2K Problem

    International Nuclear Information System (INIS)

    Medeliene, D.

    2000-01-01

    Work on preparing the hardware and software of the Ignalina NPP for the year 2000 was started in December 1998. First of all, a Y2K project team was formed comprising 29 specialists. Some of these are the most experienced computer specialist, others co-ordinate work on the Y2K problem at the divisions of the NPP using computers or microprocessors. The project head was appointed and the schedule of work confirmed. In accordance with the schedule, the work was divided into twelve stages. The results showed that the preparations were adequate. On the New Year night the specialists of the Ignalina NPP Emergency Operation Centre worked together with the managers of the plant. Relation with other Lithuanian and international organisations was established. No any Y2K related event happened

  12. The local impacts of Borssele NPP closing down

    International Nuclear Information System (INIS)

    Mandos, J.L.

    2000-01-01

    The municipal council of Borsele considers that the use of nuclear energy is a question of national policy, but considers itself responsible for town and country planning, safety and employment. The two latter aspects are especially significant if plans for shutdown are concerned. Confidence in safety of the NPP in Borsele has increased in recent years due to transparent information policy of the power plant itself as well as the local government and most of the employees living in the area. If considering the circumstances under which the decision about the closure of NPP one could sees this is a purely political decision. The local government will continue the close cooperation with the National government and the Parliament in solving the problem of employment and social impact of NPP shutdown

  13. Technical innovations at NPP Dukovany - for safe and efficient operation

    International Nuclear Information System (INIS)

    Sabata, M.; Vasa, I.

    2000-01-01

    Inherent features of the NPP Dukovany design provide a significant confidence in its nuclear safety assurance; among these features should be emphasised the reactor core stability and its control and protection system capability to hold the reactor in safe state following scram or accident conditions. Nevertheless, NPP Dukovany was designed in the early seventies, and current requirements for nuclear safety assurance are more strict and/or specific as a result of the technical development and lessons learned from nuclear accidents. The paper compares the safety design base established at the time of NPP Dukovany project implementation and the current reference design base. The paper also presents procedures applied to implement technical and operational measures which are introduced to fulfil the current basic safety criteria. The scope of such measures applied at NPP Dukovany is compared with that of EU countries introduced for the same reason - to meet the updated safety related requirements. Examples of some innovations already implemented or under implementation give an idea how NPP Dukovany proceeds in reaching the goal of harmonising its safety with the requirements to be met before the Czech Republic becomes a member country of the European Union. (author)

  14. Radiological impact on the surrounding area of Cernavoda NPP operation

    International Nuclear Information System (INIS)

    Busnita, M.; Penescu, M.; Neacsu, L.; Ion, M.; Moldoveanu, E.

    1996-01-01

    The objective of this paper is to present the protective measures provided to Cernavoda NPP for population and environment in case of normal operation and accidental situations. The paper describes the nuclear safety concept with the two aspects, the technical safety and the radiation protection, respectively, which represent the theoretical basis of the NPP design, construction and operation. The assessment of the potential radiological effects of Cernavoda NPP operation on the population and other environmental factors have been done by using the following input data: the natural and social characteristics of the site and the technical characteristics of the plant. The effects of Cernavoda NPP operation are also exposed in health risks which are compared with the daily risks of the population exposed of the natural phenomena or to the activities like transportation, domestics or industrial. (author). 1 tab., 6 refs

  15. Current status of NPP generation IV

    International Nuclear Information System (INIS)

    Yohanes Dwi Anggoro; Dharu Dewi; Nurlaila; Arief Tris Yuliyanto

    2013-01-01

    Today development of nuclear technology has reached the stage of research and development of Generation IV nuclear power plants (advanced reactor systems) which is an innovative development from the previous generation of nuclear power plants. There are six types of power generation IV reactors, namely: Very High Temperature Reactor (VHTR), Sodium-cooled Fast Reactor (SFR), Gas-cooled Fast Reactor (GFR), Lead-cooled Fast Reactor (LFR), Molten Salt Reactor (MSR), and Super Critical Water-cooled Reactor (SCWR). The purpose of this study is to know the development of Generation IV nuclear power plants that have been done by the thirteen countries that are members of the Gen IV International Forum (GIF). The method used is review study and refers to various studies related to the current status of research and development of generation IV nuclear power. The result of this study showed that the systems and technology on Generation IV nuclear power plants offer significant advances in sustainability, safety and reliability, economics, and proliferation resistance and physical protection. In addition, based on the research and development experience is estimated that: SFR can be used optimally in 2015, VHTR in 2020, while NPP types GFR, LFR, MSR, and SCWR in 2025. Utilization of NPP generation IV said to be optimal if fulfill the goal of NPP generation IV, such as: capable to generate energy sustainability and promote long-term availability of nuclear fuel, minimize nuclear waste and reduce the long term stewardship burden, has an advantage in the field of safety and reliability compared to the previous generation of NPP and VHTR technology have a good prospects in Indonesia. (author)

  16. A reliability evaluation method for NPP safety DCS application software

    International Nuclear Information System (INIS)

    Li Yunjian; Zhang Lei; Liu Yuan

    2014-01-01

    In the field of nuclear power plant (NPP) digital i and c application, reliability evaluation for safety DCS application software is a key obstacle to be removed. In order to quantitatively evaluate reliability of NPP safety DCS application software, this paper propose a reliability evaluating method based on software development life cycle every stage's v and v defects density characteristics, by which the operating reliability level of the software can be predicted before its delivery, and helps to improve the reliability of NPP safety important software. (authors)

  17. Knowledge management in the NPP domain

    International Nuclear Information System (INIS)

    Nilsen, Svein; Bisio, Rossella; Ludvigsen, Jan Tore

    2004-03-01

    This report gives an outlook on Knowledge Management (KM) activities within NPP related establishments as of today. There may be less activity in the NPP world as compared to many other industrial sectors. Still there is an awakening within the NPP industry demanding that KM should be attended to at a larger scale. The most notable reason for this is maybe an imminent increase in the number of people going into retirement. The types of establishments involved cover the major kinds such as utilities, research institutes and worldwide nuclear organizations. The report sums up a few of those efforts that are presently being implemented. Moreover the report looks at general advancements within the field of knowledge management. Simply stated the endeavours belong to either one of two classes. The first class emphasize the use of technology to solve knowledge management problems. The second class regard knowledge management as a problem pertaining to human factors and organizational issues. This report maintain that knowledge management initiatives should make due considerations to both perspectives. This report also sums up the Halden Reactor Project short term KM initiative. (Author)

  18. Medical consequences of NPP and TPP operation

    International Nuclear Information System (INIS)

    Bliznakov, V.

    1996-01-01

    Results from a comparative analysis of health conditions of the staff in the Kozloduy NPP and the Maritsa Iztok TPP are reported. It is found that the general disease incidence with temporary incapacity for work of Kozloduy workers is lower than those data for the workers at thermal power stations. The incidence of some social diseases like neoplasms, TBC, hypertension, ischemia etc. is also lower for the staff of NPP. No cases of radiation injuries have been registered for a period of 21 years

  19. International Conference of Ukrainian Nuclear Society ''NPP's safety and protection''(annotations)

    International Nuclear Information System (INIS)

    Barbashev, S.V.

    1997-01-01

    The abstracts of reports submitted to the Conference include: - New developments of the safe nuclear installations; - NPP ecological safety; - Methods of personnel and population protection; - Waste management safety (at transportation, processing and storage); - Spent nuclear fuel management; - NPP life extension and decommissioning; - Public opinion as an element of NPP safety; - Training of personnel, scientific support and safety culture; - Forecasting of nuclear power and industry safe development; - Development of international cooperation in nuclear power

  20. NPP Krsko Living PSA Concept

    International Nuclear Information System (INIS)

    Vrbanic, I.; Spiler, J.

    2000-01-01

    NPP Krsko developed PSA model of internal and external initiators within the frame of the Individual Plant Examination (IPE) project. Within this project PSA model was used to examine the existing plant design features. In order to continue with use of this PSA model upon the completion of IPE in various risk-informed applications in support of plant operation and evaluations of design changes, an appropriate living PSA concept needed to be defined. The Living PSA concept is in NPP Krsko considered as being a set of activities pursued in order to update existing PSA model in a manner that it appropriately represents the plant design, operation practice and history. Only a PSA model which is being updated in this manner can serve as a platform for plant-specific risk informed applications. The NPP Krsko living PSA concept is based on the following major ponts. First, the baseline PSA model is defined, which is to be maintained and updated and which is to be reference point for any risk-informed application. Second, issues having a potential for impact on baseline PSA model are identified and procedure and responsibilities for their permanent monitoring and evaluation are established. Third, manner is defined in which consequential changes to baseline PSA model are implemented and controlled, together with associated responsibilities. Finally, the process is defined by which the existing version of baseline PSA model is superseded by a new one. Each time a new version of baseline PSA model is released, it would be re-quantified and the results evaluated and interpreted. By documenting these re-quantifications and evaluations of results in a sequence, the track is being kept of changes in long-term averaged risk perspective, represented by long-term averaged frequencies of core damage and pre-defined release categories. These major topics of NPP Krsko living PSA concept are presented and discussed in the paper. (author)

  1. NPP Krsko small break LOCA analysis

    International Nuclear Information System (INIS)

    Mavko, B.; Petelin, S.; Peterlin, G.

    1987-01-01

    Parametric analysis of small break loss of coolant accident for the Krsko NPP was calculated by using RELAP5/MOD1 computer code. The model that was used in our calculations has been improved over several years and was previously tested in simulation (s) of start-up tests and known NPP Krsko transients. In our calculations we modelled automatic actions initiated by control, safety and protection systems. We also modelled the required operator actions as specified in emergency operating instructions. In small-break LOCA calculations, we varied break sizes in the cold leg. The influence of steam generator tube plugging on small break LOCA accidents was also analysed. (author)

  2. Quantitative analysis of psychological personality for NPP operators

    International Nuclear Information System (INIS)

    Gao Jia; Huang Xiangrui

    1998-01-01

    The author introduces the relevant personality quantitative psychological research work carried out by 'Prognoz' Laboratory and Taiwan, and presents the primary results of the research for Chinese Nuclear Power Plant (NPP) operator's psychological personality assessment, which based on the survey of MMPI, and presents the main contents for the personality quantitative psychological research in NPP of China. And emphasizes the need to carry out psychological selection and training in nuclear industry

  3. Grassland Npp Monitoring Based on Multi-Source Remote Sensing Data Fusion

    Science.gov (United States)

    Cai, Y. R.; Zheng, J. H.; Du, M. J.; Mu, C.; Peng, J.

    2018-04-01

    Vegetation is an important part of the terrestrial ecosystem. It plays an important role in the energy and material exchange of the ground-atmosphere system and is a key part of the global carbon cycle process.Climate change has an important influence on the carbon cycle of terrestrial ecosystems. Net Primary Productivity (Net Primary Productivity)is an important parameter for evaluating global terrestrial ecosystems. For the Xinjiang region, the study of grassland NPP has gradually become a hot issue in the ecological environment.Increasing the estimation accuracy of NPP is of great significance to the development of the ecosystem in Xinjiang. Based on the third-generation GIMMS AVHRR NDVI global vegetation dataset and the MODIS NDVI (MOD13A3) collected each month by the United States Atmospheric and Oceanic Administration (NOAA),combining the advantages of different remotely sensed datasets, this paper obtained the maximum synthesis fusion for New normalized vegetation index (NDVI) time series in 2006-2015.Analysis of Net Primary Productivity of Grassland Vegetation in Xinjiang Using Improved CASA Model The method described in this article proves the feasibility of applying data processing, and the accuracy of the NPP calculation using the fusion processed NDVI has been greatly improved. The results show that: (1) The NPP calculated from the new normalized vegetation index (NDVI) obtained from the fusion of GIMMS AVHRR NDVI and MODIS NDVI is significantly higher than the NPP calculated from these two raw data; (2) The grassland NPP in Xinjiang Interannual changes show an overall increase trend; interannual changes in NPP have a certain relationship with precipitation.

  4. Dukovany NPP - Safely 16 TERA

    International Nuclear Information System (INIS)

    Vlcek, J.

    2008-01-01

    In this presentation increasing of power output of the Dukovany NPP is reviewed. To operate all Dukovany Units safely with the perspective of long-term operation (LTO) of 50 - 60 years it is proposed.

  5. Chapter 8: Quality assurance

    International Nuclear Information System (INIS)

    2001-01-01

    The main efforts of Nuclear Regulatory Authority of the Slovak Republic (UJD) have been focused on inspection of quality assurance programmes of Slovak Power Stations, plc. and its daughter companies at Bohunice and Mochovce. Two quality assurance inspections in the area of periodical in service inspections (V-2 units) and tests of selected equipment (NPP V-2 units) and operation control (V-1 units) has been performed at NPPs Bohunice. One violation of decree on quality assurance of selected equipment has been found in the area of documentation archiving. The inspection concerning the implementation of quality assurance programme for operation of NPP Mochovce in the area of operation control has been performed focused on safety aspects of operation, operational procedures, control of operational events and feedback from operational experience. The results of this inspection were positive. Inspection of implementation of quality assurance programme for operation of radioactive waste repository (RU RAW) at the Mochovce location has been performed focused on receiving of containers, with radioactive wastes, containers handling, radiation monitoring, activities of documentation control and radiation protection at the repository site. No serious deficiencies have been found out. Also one inspection of experimental nuclear installations of VUJE Trnava at Jaslovske Bohunice site has been performed focused on procurement control, quality audits, documentation and quality records control when performing activities at experimental nuclear installations. The activity on development of internal quality assurance system continued. The implementation of this system will assure quality and effective fulfilment enlarged tasks of UJD with limited resources for its activity. The analyses of possible use of existing internal administrative control documentation as a basis for future quality system procedures was performed in co-operation with an external specialised organisation. The

  6. Retrofitting of NPP Computer systems

    International Nuclear Information System (INIS)

    Pettersen, G.

    1994-01-01

    Retrofitting of nuclear power plant control rooms is a continuing process for most utilities. This involves introducing and/or extending computer-based solutions for surveillance and control as well as improving the human-computer interface. The paper describes typical requirements when retrofitting NPP process computer systems, and focuses on the activities of Institute for energieteknikk, OECD Halden Reactor project with respect to such retrofitting, using examples from actual delivery projects. In particular, a project carried out for Forsmarksverket in Sweden comprising upgrade of the operator system in the control rooms of units 1 and 2 is described. As many of the problems of retrofitting NPP process computer systems are similar to such work in other kinds of process industries, an example from a non-nuclear application area is also given

  7. The Chernobyl NPP decommissioning: Current status and alternatives

    International Nuclear Information System (INIS)

    Mikolaitchouk, H.; Steinberg, N.

    1996-01-01

    After the Chernobyl accident of April 26, 1986, many contradictory decisions were taken concerning the Chernobyl nuclear power plant (NPP) future. The principal source of contradictions was a deadline for a final shutdown of the Chernobyl NPP units. Alterations in a political and socioeconomic environment resulted in the latest decision of the Ukrainian Authorities about 2000 as a deadline for a beginning of the Chernobyl NPP decommissioning. The date seems a sound compromise among the parties concerned. However, in order to meet the data a lot of work should be done. First of all, a decommissioning strategy has to be established. The problem is complicated due to both site-specific aspects and an absence of proven solutions for the RBMK-type reactor decommissioning. In the paper the problem of decommissioning option selection is considered taking into account an influence of the following factors: relevant legislative and regulatory requirements; resources required to carry out decommissioning (man-power, equipment, technologies, waste management infrastructure, etc.); radiological and physical status of the plant, including structural integrity and predictable age and weather effects; impact of planned activities at the destroyed unit 4 and within the 30-km exclusion zone of the Chernobyl NPP; planed use of the site; socio-economic considerations

  8. Programmes design for Bohunice NPP personnel other than control room operators

    International Nuclear Information System (INIS)

    Kalincik, L.

    2002-01-01

    This paper deals with project development of training programmes for non-licenced NPP personnel-masters, field operators, maintenance and technical supporting personnel. The programme development focuses on the part stage and on the job training at NPP. Bohunice NPP belongs to plants with higher specific number of personnel per installed power capacity. This factor also influenced the choice of programmes design. Undermentioned procedure is one of various approaches to SAT exploitation for training programmes design. (author)

  9. Radioactive waste problems in the Kozloduy NPP

    Energy Technology Data Exchange (ETDEWEB)

    Videnov, N; Stanchev, V [Kombinat Atomna Energetika, Kozloduj (Bulgaria)

    1996-12-31

    An average volume of 1400 m{sup 3} a year of solid radioactive waste (RAW) is generated in the Kozloduy NPP. The adopted waste processing sequence is collection, sorting and compaction with a 1000 tons force providing decrease in volume by factor of 15. A temporary storage facility at the Kozloduy NPP is licensed by ISUAE and CPPUAE. The treatment of liquid wastes is performed by Westinghouse formula and a technology using an automated solidification system. Contaminated oils are burned using an oil incinerator. A special 2-year programme for RAW management is being developed.

  10. Radioactive waste problems in the Kozloduy NPP

    International Nuclear Information System (INIS)

    Videnov, N.; Stanchev, V.

    1995-01-01

    An average volume of 1400 m 3 a year of solid radioactive waste (RAW) is generated in the Kozloduy NPP. The adopted waste processing sequence is collection, sorting and compaction with a 1000 tons force providing decrease in volume by factor of 15. A temporary storage facility at the Kozloduy NPP is licensed by ISUAE and CPPUAE. The treatment of liquid wastes is performed by Westinghouse formula and a technology using an automated solidification system. Contaminated oils are burned using an oil incinerator. A special 2-year programme for RAW management is being developed

  11. Knowledge management during decommissioning of Chornobyl NPP

    International Nuclear Information System (INIS)

    Gora, A.D.; Kuchinskij, V.K.; Stel'makh, D.A.; Tsivun, T.A.

    2010-01-01

    The article deals with issues on knowledge management during decommissioning by the example of the Chornobyl NPP. This includes how the duration of decommissioning stage, change in organization goal and final state of the site influence on human resources and knowledge management system. The main attention is focused on human assets and intellectual strength of Chornobyl NPP. Mathematical dependencies are proposed to substantiate numerical values. An analysis is given for the current situation, and forecast estimates for values dynamics is performed. The conclusion gives solutions on providing experienced staff in the future.

  12. Shock absorber in Ignalina NPP

    International Nuclear Information System (INIS)

    Bulavas, A.; Muralis, J.

    1996-09-01

    Theoretical calculation and experimental analysis of models of shock absorber in Ignalina NPP is presented. The results obtained from the investigation with model of shock absorber coincide with the theoretical calculation. (author). 2 figs., 3 refs

  13. Framatome Contribution to Chinese NPP Development and Standardization

    International Nuclear Information System (INIS)

    Charbonneau, S.

    1996-01-01

    First discussions in 1978 between Framatome and Chinese authorities about the supply of an NPP were successfully concluded in 1986 by the signature of the supply contracts (nuclear islands, conventional islands, nuclear fuel assemblies, and project management assistance) for the Daya Bay NPP. Since then teams of engineers and technicians from Framatome and other French companies, and from relevant Chinese institutes and agencies have gotten to know each other better and have deepened their relationships

  14. Computerized systems of NPP operators support. (Psychological problems)

    International Nuclear Information System (INIS)

    Mashin, V.A.

    1995-01-01

    Operator psychological problems arising in the work with NPP operators support computerized systems (OSCS) are considered. The conclusion is made that the OSCS intellectual application will bring the operator into dangerous dependence on his computerized assistant. To avoid this danger it is necessary by creation of the OSCS to divide specially the tasks areas of the operator and OSCS in order to assure the active role of the operator in the NPP control

  15. Morbidity with temporary disability in Kozloduy NPP workers

    International Nuclear Information System (INIS)

    Dobreva, B.; Novkirishki, V.

    1993-01-01

    Changes with time in indicators of disease incidence with temporary disability in Kozloduy NPP personnel have been studied for the period 1974-1991. The data were compared with those for 'Sofia-Iztok' TPP. The causes contributing to formation of the indicators of frequency, severity, and average duration were examined. No temporary disability because of radiation exposure has been recorded. As a whole, less temporary disability has been found at NPP than at TPP. (author)

  16. 20 Years of Dukovany NPP Operation and Plans for Future

    International Nuclear Information System (INIS)

    Vlcek, J.

    2006-01-01

    NPP Dukovany (4x440MW), the first Czech nuclear power plant and a keystone of Czech Electricity Grid, in 2005 celebrated 20 years of successful operation. In my presentation I am going to speak about next areas. I will start about construction and commissioning history of Dukovany NPP, then I'll put forward what milestones of Dukovany NPP operation were accomplished, I'll say examples about our modernisation and investment activities (including replacement of IandC equipment, modifications for increasing of power and support grid services) and in the end our plans for future. (author)

  17. NPP estimation and seasonal change research of Gansu province in northwest China

    Science.gov (United States)

    Han, Tao; Wang, Dawei; Hao, Xiaocui; Jiang, Youyan

    2018-03-01

    Based on GIS and remote sensing technology, this paper estimates the NPP of the 2015 year-round and every season of Gansu province in northwest China by using the CASA(Carnegie Ames Stanford Approach) light energy utilization model. The result shows that the total annual NPP of Gansu province gradually decline from southeast to northwest in the space, which is in accordance with the water and heat condition in Gansu province. The results show that the summer NPP in Gansu Province is the maximum in each season. The maximum value of summer NPP in Gansu Province reached 695 (gCm-2•season-1), and the maximum value was 473 in spring, and 288 in the autumn, and the NPP in the winter in Gansu province were under 60. The fluctuation range of NPP value is large, this is due to the diversity of ecosystem types in Gansu province, including desert, grassland, farmland and forest, among them, the grassland area is the largest, and the grassland type is very diverse, the grassland coverage is obviously different, especially the low coverage grassland growth is affected by precipitation and temperature and other meteorological factors obviously.

  18. Development of NPP Safety Requirements into Kenya's Grid Codes

    Energy Technology Data Exchange (ETDEWEB)

    Ndirangu, Nguni James; Koo, Chang Choong [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of)

    2015-10-15

    As presently drafted, Kenya's grid codes do not contain any NPP requirements. Through case studies of selected grid codes, this paper will study frequency, voltage and fault ride through requirements for NPP connection and operation, and offer recommendation of how these requirements can be incorporated in the Kenya's grid codes. Voltage and frequency excursions in Kenya's grid are notably frequently outside the generic requirement and the values observed by the German and UK grid codes. Kenya's grid codes require continuous operation for ±10% of nominal voltage and 45.0 to 52Hz on the grid which poses safety issues for an NPP. Considering stringent NPP connection to grid and operational safety requirements, and the importance of the TSO to NPP safety, more elaborate requirements need to be documented in the Kenya's grid codes. UK and Germany have a history of meeting high standards of nuclear safety and it is therefore recommended that format like the one in Table 1 to 3 should be adopted. Kenya's Grid code considering NPP should have: • Strict rules for voltage variation, that is, -5% to +10% of the nominal voltage • Strict rules for frequency variation, that is, 48Hz to 52Hz of the nominal frequencyand.

  19. Development of NPP Safety Requirements into Kenya's Grid Codes

    International Nuclear Information System (INIS)

    Ndirangu, Nguni James; Koo, Chang Choong

    2015-01-01

    As presently drafted, Kenya's grid codes do not contain any NPP requirements. Through case studies of selected grid codes, this paper will study frequency, voltage and fault ride through requirements for NPP connection and operation, and offer recommendation of how these requirements can be incorporated in the Kenya's grid codes. Voltage and frequency excursions in Kenya's grid are notably frequently outside the generic requirement and the values observed by the German and UK grid codes. Kenya's grid codes require continuous operation for ±10% of nominal voltage and 45.0 to 52Hz on the grid which poses safety issues for an NPP. Considering stringent NPP connection to grid and operational safety requirements, and the importance of the TSO to NPP safety, more elaborate requirements need to be documented in the Kenya's grid codes. UK and Germany have a history of meeting high standards of nuclear safety and it is therefore recommended that format like the one in Table 1 to 3 should be adopted. Kenya's Grid code considering NPP should have: • Strict rules for voltage variation, that is, -5% to +10% of the nominal voltage • Strict rules for frequency variation, that is, 48Hz to 52Hz of the nominal frequencyand

  20. Upgrading NPP personnel. Competence and training through the systematic approach to training

    International Nuclear Information System (INIS)

    Mautner Markhof, F.

    1998-01-01

    This paper presents the reasons for acceptance of SAT (Systematic Approach to Training) as the best international practice in respect to training of NPP personnel and the differences in comparison to traditional approaches to training. The identification and evaluation of the new training needs, resources and other requirements for implementing SAT are discussed as well as new approaches and existing training capabilities and involvement of Regulatory body in training of NPP personnel. The IAEA Guidebook on NPP Personnel Training (TRS-380) was used a a basis for discussion of the mentioned topics with the emphasis on achieving the best possible training programmes for NPP personnel

  1. Validation of S-NPP VIIRS Sea Surface Temperature Retrieved from NAVO

    Directory of Open Access Journals (Sweden)

    Qianguang Tu

    2015-12-01

    Full Text Available The validation of sea surface temperature (SST retrieved from the new sensor Visible Infrared Imaging Radiometer Suite (VIIRS onboard the Suomi National Polar-Orbiting Partnership (S-NPP Satellite is essential for the interpretation, use, and improvement of the new generation SST product. In this study, the magnitude and characteristics of uncertainties in S-NPP VIIRS SST produced by the Naval Oceanographic Office (NAVO are investigated. The NAVO S-NPP VIIRS SST and eight types of quality-controlled in situ SST from the National Oceanic and Atmospheric Administration in situ Quality Monitor (iQuam are condensed into a Taylor diagram. Considering these comparisons and their spatial coverage, the NAVO S-NPP VIIRS SST is then validated using collocated drifters measured SST via a three-way error analysis which also includes SST derived from Moderate Resolution Imaging Spectro-radiometer (MODIS onboard AQUA. The analysis shows that the NAVO S-NPP VIIRS SST is of high accuracy, which lies between the drifters measured SST and AQUA MODIS SST. The histogram of NAVO S-NPP VIIRS SST root-mean-square error (RMSE shows normality in the range of 0–0.6 °C with a median of ~0.31 °C. Global distribution of NAVO VIIRS SST shows pronounced warm biases up to 0.5 °C in the Southern Hemisphere at high latitudes with respect to the drifters measured SST, while near-zero biases are observed in AQUA MODIS. It means that these biases may be caused by the NAVO S-NPP VIIRS SST retrieval algorithm rather than the nature of the SST. The reasons and correction for this bias need to be further studied.

  2. Public acceptance of nuclear energy in Indonesia. A traditional puppet show for NPP in Java

    International Nuclear Information System (INIS)

    Suyudi Soeliarno

    1995-01-01

    In Indonesia, activities on public relation have been carried out since the establishment of the agency responsible for research and development of atomic energy in 1958 (which later in the year 1964 became Batan, National Atomic Energy Agency), wile activities on public acceptance started 'at the end of 1985. After the Government indicated that it has to look seriously into the construction of the NPP, as from 1990, the public acceptance (PA) activities have been intensified in anticipation of the construction of the first NPP. An important part of the preparatory activities for the construction of the NPP is preparing the people, particularly those who live near the NPP site, to accept and to support the NPP program. The interdepartmental team has bee established in August 1990 consisting of representatives of several institutions, namely, Ministry of Information, Ministry of Domestic Affairs, Ministry of Defense, Land Utilization Agency, State Electricity Corporation, Office of the Minister for Population and Environment, and Batan. This team, called the 'Team on Public Acceptance of NPP', has the main task providing extensive information to the public concerning the government plan to construct nuclear power plants in Indonesia. From 1990 through the middle of 1994 the activity of the Team on Public Acceptance of NPP was focused on providing information on te NPP program to the local community leaders and the public, particularly in the districts of the NPP site in the Muria Peninsula region. Its main purpose was to precondition the people who live near the NPP site to accept the NPP in their neighbourhood without fear

  3. NPP Boreal Forest: Consistent Worldwide Site Estimates, 1965-1995, R1

    Data.gov (United States)

    National Aeronautics and Space Administration — This data set provides estimates of above- and below-ground biomass, above- and below-ground NPP (ANPP and BNPP), and total NPP(TNPP) for selected North American and...

  4. Use of NESTLE computer code for NPP transition process analysis

    International Nuclear Information System (INIS)

    Gal'chenko, V.V.

    2001-01-01

    A newly created WWER-440 reactor model with use NESTLE code is discussed. Results of 'fast' and 'slow' transition processes based on it are presented. This model was developed for Rovno NPP reactor and it can be used also for WWER-1000 reactor in Zaporozhe NPP

  5. About choosing the power unit of NPP

    International Nuclear Information System (INIS)

    Alekseev, P.N.; Mordashev, V.M.; Proshkin, A.A.; Stukalov, V.A.; Subbotin, S.A.; Tsibul'skij, V.F.; Chernilin, Yu.F.

    2008-01-01

    The present-day domestic nuclear power industry faces the necessity to make both process and economy related decisions. The mentioned decisions should cover all the aspects of the nuclear power complex. In particular, as of now, no substantiation of the present-day and the future requirements for the power unit of the WWER and fast reactor NPPs is available. The choice of the unit power of an NPP should involve consideration of all factors and should not be boiled down to the efforts to ensure the minimization of the investment and the operation constituents of the electric power generation costs. The aim of the present paper was to ensure elaboration of the recommendations to substantiate the optimal unit power of NPP power units based on the analysis of various factors to design, to construct and to operate an NPP (investment, time of construction, the unscheduled shutdown losses, the unification, the fabrication quality, the accident damage, etc.), and the electrical network potentialities and the regional electric power demands [ru

  6. Implementing the Environmental Management System ISO 14001 at the Cernavoda NPP Unit 1

    International Nuclear Information System (INIS)

    Jelev, Adrian

    2003-01-01

    An environmental management plan (EMP) has been developed for the Cernavoda NPP Unit 1. It contains the necessary components for identification and management of the environmental aspects of NPP. The environmental policy of the 'Nuclearelectrica' National Society and the associated EMP are the basis for the Environment Management System that will be implemented at Cernavoda NPP. The final step of this process will be the ISO 14001 certification. This paper points out to the main aspects concerning the implementation of the ISO 14001 system at Cernavoda NPP Unit 1. (author)

  7. Temelin NPP commissioning experiences

    International Nuclear Information System (INIS)

    Hanus, V.

    2002-01-01

    The Building Permit for the Temelin NPP with four VVER units was issued in 1986, which is a long time ago. Since then, however, was taken a route that is very different from what anybody imagined. Described are the legislative and design changes and given is a current condition of the power plant

  8. ASSET experience at Paks NPP

    International Nuclear Information System (INIS)

    Szabo, I.

    1997-01-01

    At Paks NPP special attention has been paid to international reviews since the very beginning of operation. Several international teams visited Paks in order to provide independent assessment of plant performance, conditions and safety. Paks NPP Management has the further intention to invite international reviews regularly (yearly) in the future as well. The experience gained during these reviews helped to establish a unified process of preparation for the reviews, performing them and handling the results. The Safety Department is in charge of organization of the whole process. All these reviews have their specific features and they are focused on different areas. The ASSET reviews provides the assessment of plant performance and safety through the analysis of safety significant events, which have occurred at the nuclear power plant. This approach makes this review specific and different from the other ones

  9. ASSET experience at Paks NPP

    Energy Technology Data Exchange (ETDEWEB)

    Szabo, I [Operational Safety Dept., Paks NPP, Paks (Hungary)

    1997-10-01

    At Paks NPP special attention has been paid to international reviews since the very beginning of operation. Several international teams visited Paks in order to provide independent assessment of plant performance, conditions and safety. Paks NPP Management has the further intention to invite international reviews regularly (yearly) in the future as well. The experience gained during these reviews helped to establish a unified process of preparation for the reviews, performing them and handling the results. The Safety Department is in charge of organization of the whole process. All these reviews have their specific features and they are focused on different areas. The ASSET reviews provides the assessment of plant performance and safety through the analysis of safety significant events, which have occurred at the nuclear power plant. This approach makes this review specific and different from the other ones.

  10. Radioactivity in the environment

    International Nuclear Information System (INIS)

    2006-01-01

    In this report different aspects of the radioactivity in the environment of the Slovak Republic for the period of 2004 - 2006 years are reported. This report is published only on the Enviroportal.sk. The following aspects of the radioactivity in the environment are reviewed there: Electricity production in nuclear power plants and their consumption; Natural sources of ionisation radiation; Man-made sources of ionisation radiation; Safety of exploitation of the nuclear power plants on the territory of the Slovak Republic; International Nuclear Event Scale; Basic information about influence of radiation on health of population and about evaluation methods; Influence of physical risk factors (including of ionisation radiation) in the working environment on formation of occupation diseases; Collective doses of occupation in NPPs; Health state of population in the locality of the NPP Mochovce; Food contamination by ionisation radiation; Radiation monitoring network; Legislative directives about population health protection against ionisation radiation action; Decommissioning of the NPP Jaslovske Bohunice (EBO V-1); Conception of the back fuel cycle and treatment of spent fuels and high-level radioactive wastes; Project of territorial-economic development of the Trnava region after decommissioning of the Jaslovske Bohunice NPP

  11. Analysis of an NPP Structure subjected to Vibrations Induced from Airplane Crashes

    International Nuclear Information System (INIS)

    Noh, Sang Hoon; Kim, Yong Soo; Kim, Chong Hak

    2009-01-01

    After the terrorists' attacks with civilian airplanes on September 11, 2001, special attention has been paid to the potential for an airplane crash into a Nuclear Power Plant (NPP) as a man-made hazard. An airplane crash (APC) into an NPP has the potential to damage the roofs and walls of these structures, as well as other systems and components such as pipelines, electric motors, power supplies, power cables of electricity transmission that are important for safety. Therefore, an evaluation of the structural response to an APC is important for the safety of NPPs to be confirmed. A structural integrity analysis was carried out focusing on the vibration effects of an APC on an NPP structure. The NPP structure under consideration has been conceptually redesigned based on APR1400 to have double containments for the purpose of a feasibility study to meet European requirements. The finite element method was used for the structural analysis of the NPP, and the computer code ABAQUS was employed for this analysis

  12. Safety Culture Survey in Krsko NPP

    International Nuclear Information System (INIS)

    Strucic, M.; Bilic Zadric, T.

    2008-01-01

    The high level of nuclear safety, stability and competitiveness of electricity production, and public acceptability are the main objectives of Krsko Nuclear Power Plant. This is achievable only in environment where strong Safety Culture is taking dominant place in the way how employees communicate, perform tasks, share their ideas and attitudes, and demonstrate their concern in all aspects of work and coexistence. To achieve these objectives, behaviour of all employees as well as specific ethical values must become more transparent and that must arise from the heart of organization. Continuous ongoing and periodic self assessments of Safety Culture in Krsko NPP present major tools in implementation process of this approach. Benefits from Periodic interdisciplinary focused self assessment approach, which main intention is finding the strengths and potential areas for improvements, was used second time to assess the area of Safety Culture in Krsko NPP. Main objectives of self assessment, performed in 2006, were to increase the awareness of the present culture, to serve as a basis for improvement and to keep track of the effects of change or improvement over a longer period of time. For the purpose of effective self assessment, extensive questionnaire was used to obtain information that is representative for whole organization. Wide range of questions was chosen to cover five major characteristics of safety culture: Accountability for safety is clear, Safety is integrated into all activities, Safety culture is learning-driven, Leadership for safety is clear and Safety is a clearly recognized value. 484 Krsko NPP employees and 96 contractors were participated in survey. 70-question survey provided information that was quantified and results compared between groups. Anonymity of participant, as well as their willingness to contribute in this assessment implicates the high level of their openness in answering the questions. High number of participant made analysis of

  13. Ecological radiation monotoring in NPP region, aims and tasks

    International Nuclear Information System (INIS)

    Egorov, Yu.A.

    1986-01-01

    Aims and tasks of ecological radiation monitoring in the NPP region are discussed. The aims of monitoring are: to determine possible sequences of NPP radioactive release effects on ecosystems, taking place on the background of chemical and thermal pollution to develop standard of radiation effect on ecosystems; the aims includes also obtaining of information for forecasting and evaluating long-term radiation effects, establishment of factors characterizing the ecosystem state, establishment of a combined effect of radioactive wastes with chemical and thermal ones. Finally, the aim of monitoring consists in providing the natural object conservation in the NPP region under optimal operation conditions. Thus it is necessary to solve the following problems: to observe systematically release, transport and transformation, when transporting radioactive and chemical contaminants in terrestial and aquatic biocenoses, as well as injection and transport in them of waste heat; to observe systematically the natural physico-chemical, chemico-biological processes affecting the injection and transport of contaminants in ecosystem components; to observe systematically the natural and, probably, antropogenic processes; to carry out systematically observations of the ecosystem state in the NPP region and eco-systems-monitors

  14. Safety aspects of NPP ageing

    International Nuclear Information System (INIS)

    1995-01-01

    Preparation of safety practices on assessment and management of aging of major NPP components important to safety, CRP on management of aging of concrete containment buildings, CRP on management of aging of in-containment instrumentation and control cables are outlined

  15. Qualification of NPP operations personnel

    International Nuclear Information System (INIS)

    Wang Jiao.

    1987-01-01

    Competence of personnel is one of the important problems for safety operation of nuclear power plant. This paper gives a description of some aspects, such as the administration of NPP, posts, competence of personnel, training, assessing the competence and personnel management

  16. Conceptual Design of a Combined Power Generation Unit at the NPP Seaside

    International Nuclear Information System (INIS)

    Cha, Kyung H.

    2011-01-01

    In order to improve operational performance, an undersea tunnel is being utilized for in-taking and out-taking seawater as coolant in Nuclear Power Plant (NPP). This paper describes a Combined solar-wind-wave Power Generation Unit (CPGU) to be specialized for in-taking and out-taking seawater as coolant in NPP. Accordingly, the purpose of the CPGU is twofold: one is to contain some tunnels to be maintained on the bottom of the CPGU body in order to in-take and out-take coolant water, and the other is to generate a combined power at the NPP seaside. Fig. 1 shows the conceptual CPGU to be configured at the NPP seaside

  17. The experience from operation of electronic personal dosimetry system at Dukovany, Temelin and Mochovce NPPs after repair of Siemens dosemeters eliminating false doses

    International Nuclear Information System (INIS)

    Malysak, J.; Kocvara, S.; Jurochova, B.; Zelenka, Z.; Schacherl, M.; Zrubec, M.; Kaiser, H.

    2003-01-01

    This presentation summarizes the operational experience of the Electronic Personal Dosimetry Systems installed at Dukovany, Temelin and Mochovce NPPs. The system consists of three basic parts: Electronic personal dosemeters (EPD); Physical layer (HW); Logical layer (SW). Number of false doses before and after correction is presented. This presentation has demonstrated the possibilities of SEOD system and the possibility of easy dose comparison between the individual NPPs after introducing this electronic dosimetry system. Basically, the results of film and electronic dosimetry systems are according to our findings nearly identical. Electronic dosemeter sensitivity to interfering electromagnetic fields is a problem which is easily re-movable. In addition, if we know this problem, these false doses in the SEOD system can be easily revealed (e.g. by investigation of histograms) and repaired

  18. PTS assessment - The basis of life time evaluation at NPP Paks

    International Nuclear Information System (INIS)

    Elter, J.; Oszwald, F.; Ratkay, S.; Fekete, T.; Gillemot, F.; Marothy, L.

    1997-01-01

    Plant specific PTS analysis at NPP Paks was performed in the frame of the AGNES (Advanced General New Evaluation of Safety) project. NPP Paks belongs to the second generation of the WWER-440/213 NPP-s. To verify the safety during transient events and predict the lifetime of the RPV-s several transient cases have been analyzed. The paper summarizes: The general scheme elaborated for the assessment; the safety philosophy used; the applied and available codes and methods; the ongoing and planned developments. (author). 8 refs, 3 figs, 1 tab

  19. PTS assessment - The basis of life time evaluation at NPP Paks

    Energy Technology Data Exchange (ETDEWEB)

    Elter, J; Oszwald, F; Ratkay, S [NPP Paks (Hungary); Fekete, T; Gillemot, F; Marothy, L [Atomic Energy Research Inst., Budapest (Hungary)

    1997-09-01

    Plant specific PTS analysis at NPP Paks was performed in the frame of the AGNES (Advanced General New Evaluation of Safety) project. NPP Paks belongs to the second generation of the WWER-440/213 NPP-s. To verify the safety during transient events and predict the lifetime of the RPV-s several transient cases have been analyzed. The paper summarizes: The general scheme elaborated for the assessment; the safety philosophy used; the applied and available codes and methods; the ongoing and planned developments. (author). 8 refs, 3 figs, 1 tab.

  20. Top level risk study for units 1 to 4 at NPP Kozloduy

    International Nuclear Information System (INIS)

    Shishkova, I.

    1997-01-01

    The first Top Level Study of NPP Kozloduy Units 1/4 was started in 1991 and completed in March 1992 by BEQE. The Primary objective of the project was to provide in a short term a tool for quantified comparison of the relative risk benefits that various design or operational modifications would have if implemented on NPP Kozloduy Units 1/4. This original version of the Study was reviewed by the IAEA who agreed in general with the conclusions indicating that the report provides valuable insights which should be used in the decision making process. The IAEA made suggestion for some changes. These comments were taken into account in the subsequent version. In early 1994 the new version was issued. The objective of this second project, in addition to revising the original study to reflect the IAEA comments, was to address the potential benefits from further improvements at NPP Kozloduy. The work on the second version was going on in parallel with the activities carried out in the mainframe of several NPP Kozloduy Units 1/4 Upgrading Program (WANO Six-Month Program, Program for the NPP Kozloduy Units 1-4 Upgrading, Twinning Program, etc.). And at last, a Top-Level Probabilistic Safety Study was carried out by EQE - Bulgaria and completed early in 1995 at the request of NPP Kozloduy. The objective of the project was the contribution of the different activities performed in the mainframe of the Program for the NPP Kozloduy Units 1-4 Safety Upgrading in the overall safety improvement to be assessed. 3 figs, 1 tab

  1. NPP operation and modern high technologies

    International Nuclear Information System (INIS)

    Kuznetsov, V.V.

    1992-01-01

    Examples are considered of modern high technology introduction into daily practice of NPP operation, namely: satellite communication systems, robots, non-destructive testing, optical-fiber techniques, laser measuring means and others

  2. Design of NPP of new generation being constructed at the Novovoronezh NPP site

    International Nuclear Information System (INIS)

    Afrov, A.; Berkovich, V.; Generalov, V.; Dragunov, Yu.; Krushelnitsky, V.

    1999-01-01

    The design of a new generation NPP is described, underscoring advances in physical attributes and passive safety systems based on experiences with earlier designs at operating NPPs. This paper elaborates on systems for handling and storing radioactive wastes, on refinements in containment measures and on experimental and analytic validation of critical design factors. (author)

  3. Equipment reliability improvement process; implementation in Almaraz NPP and Trillo NPP

    International Nuclear Information System (INIS)

    Risquez Bailon, Aranzazu; Gutierrez Fernandez, Eduardo

    2010-01-01

    The Equipment Reliability Improvement Process (INPO AP-913) is a non-regulatory process developed by the US Nuclear Industry for improving Plants Availability. This Process integrates and coordinates a broad range of equipment reliability activities into one process, performed by the Plant in a non-centralized way. The integration and coordination of these activities will allow plant personnel to evaluate the trends of important station equipment, develop and implement long-term equipment health plans, monitor equipment performance and condition, and make adjustments to preventive maintenance tasks and frequencies based on equipment operating experience, if necessary, arbitrating operational and design improvements, to reach a Failure-free Operation. This paper describes the methodology of Equipment Reliability Improvement Process, being focused on main aspects of the implementation process, relating to the scope and establishment of an Equipment Reliability Monitoring Plan, which should include and complement the existing mechanisms and organizations in the Plant to monitor the condition and performance of the equipments, with the common aim of achieving an operation free of failures. The paper will describe the tools that Iberdrola Ingenieria has developed to support the implementation and monitoring of the Equipment Reliability Improvement Process, as well as the results and lessons learned from its implementation in Almaraz NPP and Trillo NPP. (authors)

  4. Dukovany NPP maintenance management

    International Nuclear Information System (INIS)

    Siegel, F.

    2005-01-01

    Maintenance planning and management for the technological equipment of the Dukovany NPP are described. A Maintenance Control and Evaluation System has been developed and is in use to help manage the complex maintenance issue. Practical examples of outputs of the System, with a comprehensive use of the cost, reliability and safety related data, are presented. (author)

  5. Core design methodology and software for Temelin NPP

    International Nuclear Information System (INIS)

    Havluj, F; Hejzlar, J.; Klouzal, J.; Stary, V.; Vocka, R.

    2011-01-01

    In the frame of the process of fuel vendor change at Temelin NPP in the Czech Republic, where, starting since 2010, TVEL TVSA-T fuel is loaded instead of Westinghouse VVANTAGE-6 fuel, new methodologies for core design and core reload safety evaluation have been developed. These documents are based on the methodologies delivered by TVEL within the fuel contract, and they were further adapted according to Temelin NPP operational needs and according to the current practice at NPP. Along with the methodology development the 3D core analysis code ANDREA, licensed for core reload safety evaluation in 2010, have been upgraded in order to optimize the safety evaluation process. New sequences of calculations were implemented in order to simplify the evaluation of different limiting parameters and output visualization tools were developed to make the verification process user friendly. Interfaces to the fuel performance code TRANSURANUS and sub-channel analysis code SUBCAL were developed as well. (authors)

  6. Main principles of the Chernobyl' NPP zone development

    International Nuclear Information System (INIS)

    Ignatenko, E.I.; Komarov, V.I.; Zverkov, V.V.; Proskuryakov, A.G.

    1989-01-01

    It is suggested to divide the Chernobyl' NPP zone into two parts, which are the alienation and evacuation (buffer) zones. The alienation zone includes the areas with greatest contamination around the Chernobyl' NPP. The population residence in this zone is forbidden. The watching method of working with short-time personnel residence is suggested to be used in this zone. The buffer zone is the territory out of the alienation zone boundaries including all settlements, from which the population is evacuated. Constant residence is permitted in the buffer zone for persons 50 and more years old with introduction of restrictions for diet and residence organization. The production activity in this zone includes operation of three units of the Chernobyl' NPP, works with the Ukrytie object and researches. Operations connected with radioactive waste processing and redisposal from places of storage is not recommended to be done. It is suggested to develop methods for local radioactive waste processing

  7. NPP Temelin. Status of safety improvements

    International Nuclear Information System (INIS)

    1999-01-01

    The WWER-1000 Temelin NPP under construction has been subjected as other NPPs of the same type to numerous project reviews resulting in quite a number of recommendations for design changes. Results of the IAEA mission to review the resolution of WWER-1000 safety issues at Temelin NPP are cited in this paper. The main conclusions emphasize that a combination of eastern and western technology and practices led to safety improvements in comparison with the international practices. Plant managers are clearly committed to implementation of operational programs which are consistent with effective western operational safety practices. Considerable effort remains to bring planned programs to successful implementation, in particular in meeting the need to foster strong safety culture among all personnel

  8. A comparison of the Kozloduy NPP and Temelin NPP I and C projects

    International Nuclear Information System (INIS)

    Cook, B.M.

    2004-01-01

    Because Kozloduy NPP and Temelin NPP are both VVER 1000 plants of roughly the same vintage, they are very similar in design. However, from the viewpoint of their I and C modernization projects, there are significant differences between these plants. Some of these differences stem from the evolution of I and C technology over the relatively short period between the two projects. Other differences arise from the fact that the Kozloduy project is a phased upgrade of the I and C systems in an operating plant while the Temelin project was a 'one time' installation of the entire plant I and C system. This paper discusses these differences as well as trends in the nuclear I and C field that will shape the industry in the future. In addition to technology evolution, the comparative advantages or problems in phased upgrade versus 'one time' installations are discussed. Conclusions drawn provide insight for the planning of future I and C upgrades in VVERs and other types of nuclear power plants. (author)

  9. The safety of Ignalina NPP and ecological danger in public opinion of inhabitants of Daugavpils region

    International Nuclear Information System (INIS)

    Peipinia, O.

    1998-01-01

    Inquest of Daugavpils' region pointed to a big anxiety for ecological danger of Ignalina NPP by inhabitants and experts. Absolute majority of respondents (73-78% inhabitants and 68-82% experts) apprehend the NPP as very dangerous and dangerous. More than half of respondents apprehend the dangerous increased during last two-three years. It is because no one has a good reference about situation, because tragic al Chernobyl NPP burst was on. The anxiety increases if the respondent lives nearer of NPP. Inhabitants of Daugavpils and it's region wants the better reference about situation, about future of Ignalina NPP after 2010 year, about securities means in case of NPP burst. (author)

  10. Nuclear Research Institute Rez view

    International Nuclear Information System (INIS)

    Biza, K.; Pazdera, F.; Vasa, I.; Zdarek, J.

    2004-01-01

    In this presentation author deals with the present state and perspectives of nuclear energy in the Czech Republic and in the Slovak Republic. It is concluded that lifetime extension and finalization of Mochovce NPP Units 3 and 4 is the cheapest solution for base load production of electricity and is in line with the European union energy challenges: - decrease of carbon dioxide emissions; dependence on energy sources from politically unstable regions; decrease import dependence on energy sources. Nuclear energy is one of important sources for long term sustainability in energy. GEN IV is successful with meet the new requirements after 2025. We should participate on this long term development effort

  11. Education and training of experts for the nuclear power sector at the Faculty of Electrical Engineering and Information Technologies, Slovak University of Technology in Bratislava

    International Nuclear Information System (INIS)

    Lipka, J.; Slugen, V.; Miglierini, M.; Necas, V.; Hascik, J.; Pavlovic, M.

    2003-01-01

    The Faculty of Electrical Engineering and Information Technologies, Slovak University of Technology in Bratislava has been training experts for the nuclear sector for over 40 years now. Current status and trends in nuclear education within the faculty's educational system, encompassing BSc, MSc and PhD studies, are highlighted. Dedicated training courses in the safety aspects of operation of the nuclear power installations are also organized for NPP staff. Periodical training is also provided to supervising physicists at the Jaslovske Bohunice and Mochovce nuclear power plants. Major international projects aimed at nuclear knowledge management and preservation are highlighted and the ENEN - European Nuclear Education Network project is described. (P.A.)

  12. Operation experience of the advanced fuel assemblies at Unit 1 of Volgodonsk NPP within four fuel cycles

    International Nuclear Information System (INIS)

    Vasilchenko, I.; Kobelev, S.; Kushmanov, S.

    2006-01-01

    The first commissioning of Volgodonsk NPP Unit 1 with standard reactor WWER-1000 (project V-320) was in 2001. The reactor core, starting from the first fuel charge, was arranged completely with Advanced Fuel Assemblies (AFAs). In this way, it is possible to obtain the experience in startup and operation of the core, completely arranged with AFAs, and also to get a possibility of performing the comprehensive check for justification of newly commissioned units and justification of design solutions accepted in the design of reactor core for Taiwan NPP, Bushehr NPP and Kudankulam NPP. The first fuel charge of the Volgodonsk NPP Unit 1 is a reference and unified for Tiawan NPP (V-428), Bushehr NPP (V-446), Kudankulam NPP(V-412) with small differences caused by design features of RP V-320. The first core charge of Unit 1 of Volgodonsk NPP was arranged of 163 AFAs, comprising 61 CPS ARs and 42 BAR bundles. The subsequent fuel charges were arranged of AFAs with gadolinium oxide integrated into fuel instead of BAR. By 2005 the results of operation of the core at Unit 1 of Volgodonsk NPP during four fuel cycles showed that AFA is sufficiently reliable and serviceable. The activity of the primary coolant of the Volgodonsk NPP is at stable low level. During the whole time of the core operation of the Volgodonsk NPP Unit 1 no leaky AFAs were revealed. The modifications of the internals, made during pre-operational work, are reasonable and effective to provide for fuel mechanical stability in the course of operation. The modifications, made in AFA structure during operation of the Volgodonsk NPP Unit 1, are aimed at improving the service and operational reliability of its components. Correctness of the solutions taken is confirmed by AFAs operation experience both at the Volgodonsk NPP, and at other operating Russian NPPs

  13. Supercompaction of radioactive waste at NPP Krsko

    International Nuclear Information System (INIS)

    Fink, K.; Sirola, P.

    1996-01-01

    The problem of radioactive waste management is both scientifically and technically complex and also deeply emotional issue. In the last twenty years the first two aspects have been mostly resolved up to the point of safe implementation. In the Republic of Slovenia, certain fundamentalist approaches in politics and the use of radioactive waste problem as a political tool, brought the final radioactive repository siting effort to a stop. Although small amounts of radioactive waste are produced in research institutes, hospitals and industry, major source of radioactive waste in Slovenia is the Nuclear Power Plant Krsko. When Krsko NPP was originally built, plans were made to construct a permanent radioactive waste disposal facility. This facility was supposed to be available to receive waste from the plant long before the on site storage facility was full. However, the permanent disposal facility is not yet available, and it became necessary to retain the wastes produced at the plant in the on-site storage facility for an extended period of time. Temporary radioactive storage capacity at the plant site has limited capacity and having no other options available NPP Krsko is undertaking major efforts to reduce waste volume generated to allow normal operation. This article describes the Radioactive Waste Compaction Campaign performed from November, 1994 through November, 1995 at Krsko NPP, to enhance the efficiency and safety of storage of radioactive waste. The campaign involved the retrieval, segmented gamma-spectrum measurement, dose rate measurement, compaction, re-packaging, and systematic storage of radioactive wastes which had been stored in the NPP radioactive waste storage building since plant commissioning. (author)

  14. Perspectives of Living PSA in NPP Krsko

    International Nuclear Information System (INIS)

    Vrbanic, I.; Kastelan, M.

    1996-01-01

    Nuclear power plant Krsko has completed the Level 1/Level 2 Probabilistic Safety Analysis (PSA) for internal initiating events and is in the process of completing the same for the external initiators. The analysis completed up to now has provided a valuable insight into a plant risk profile. In NPP Krsko there is a plan to use the PSA model as a permanent tool for the risk based applications and incorporate it into a decision making process. In order to achieve this there is a need to permanently maintain the PSA model in a manner that it reflects both the plan configuration/design at a time point and the operational experience up to the time point. All the activities aimed toward keeping the PSA model up-to-dated in this sense are usually referred to as a Living PSA (LPSA) program. NPP Krsko is in the process of defining and proceduralizing a LPSA program that would be plant specific and based on known world practices. Further, in order to be suitable for risk based applications the PSA model must be flexible in a sense that modifications to the base case model may be done easily and requantifications performed quickly as to evaluate various conditions imposed by real or hypothetical situations. NPP Krsko PSA model has been based on licensing type software. The requirements specified above dictate the transfer of the overall model to an application oriented software of newer generation with larger capabilities. The transfer becomes a part of a mentioned ongoing effort aimed at establishing LPSA model and concept. The paper present this effort and the perspectives of LPSA concept and risk based applications in NPP Krsko. (author)

  15. Ways of solving the problem of NPP evaporate concentrate storage

    International Nuclear Information System (INIS)

    Dmitriev, S.A.; Lifanov, F.A.; Savkin, A.E.; Lashchenov, S.M.

    2000-01-01

    The use of next engineering operations: isotope separation using oxidation, filtration and selective sorption methods, hardening and long term secondary radioactive waste disposal (cement compound from filtration stage and depleted sorbent on filters); concentration and preparation of dry salts from the radionuclide-free stillage residues were proposed for NPP waste reprocessing. The laboratory and pilot tests that demonstrated the possibility for purification of NPP stillage residues from radionuclides to the levels less than maximum permissible ones were conducted. The purified stillage residues are sent for the burial after drying. The calculations of material flows are treated by the example of the Kursk NPP stillage residue and the scheme of the waste retrieval is given [ru

  16. Tritium liquid effluents from the Krsko NPP

    International Nuclear Information System (INIS)

    Savli, S.; Krizman, M.; Nemec, T.; Cindro, M.; Stritar, A.; Vokal Nemec, B.; Janzekovic, H.

    2007-01-01

    In the past, 12-months' fuel cycles in the Krsko NPP had not caused any problems regarding compliance with its Technical Specifications and license limits on liquid tritium releases (20 TBq/year, 8 TBq/three months). The first 18-months' fuel cycle, which was introduced in 2004, required fuel with higher enrichment, higher boron concentration in the primary coolant and more fuel rods with burnable poisons. In 2005, the NPP operated without refueling outage for the whole year and produced the highest amount of energy so far. Due to these facts and a few unplanned shutdowns and power reductions, production of tritium and releases increased strongly in 2005. As a result, the Krsko NPP hardly succeeded to stay within regulatory limits on tritium releases. However, the three-months' limit was exceeded in the first quarter of 2006. On the basis of conclusions acquired from the SNSA's study and practice of other European countries the SNSA considerably increased the annual limit of permitted liquid tritium releases (from 20 TBq to 45 TBq) and abolished the three-months' limit. At the same time, the SNSA reduced the limit of fission and activation products by halves. (author)

  17. Variations and trends of terrestrial NPP and its relation to climate

    Indian Academy of Sciences (India)

    Considering global climate change, near surface temperature is the major factor affecting the terrestrial ecosystem, followed by the precipitation. This means terrestrial ecosystem NPP is more closely related to near surface temperature than precipitation. Between 1976 and 2005, NPP shows an obvious increasing temporal ...

  18. New Emergency control center of Slovenske Elektrarne Bohunice NPP

    International Nuclear Information System (INIS)

    Pecko, E.

    2012-01-01

    Emergency preparedness of nuclear power plant and operation assurance in case of a possible emergency calls to have devices for emergency response with equipment for rapid detection and continuous evaluation of anticipated events. Chief executive body designated to manage a nuclear power plant during major events is the emergency committee (EC). Emergency Committee is a part of the Emergency Response Organization (ERO). The following centers are on alert to ensure the activities of the ERO - Emergency Response office: - control room (CR) and emergency control room (ECR); - emergency management center (EMC); - Monitoring Centre (MC); - emergency backup control center (EBCC); - congregations of civil protection (CP) and CP shelters; - communications with warning and notification system (VARVYR). From a historical and practical point of view in the vicinity of Jaslovske Bohunice has been set up a joint emergency control center. The center was located on the territory of the former already inoperative V1 NPP. V1 NPP is currently integrated into the organizational structure of JAVYS. Operating Bohunice V2 NPP plant is a designated part of the Slovenske Elektrarne, a. s., whose majority owner is an Italian operator ENEL. In terms of various relevant factors, it was decided to build a new emergency management center on the territory of operating V2 NPP, meet the current standards.

  19. Improvement of waste release control in French NPP

    International Nuclear Information System (INIS)

    Samson, T.; Lucquin, E.; Dupin, M.; Florence, D.; Grisot, M.

    2002-01-01

    The new waste release control in French NPP is more restrictive than the old one and needs heavy investment to bring plants to compliance with it. The great evolutions are a chemical follow up on more chemicals with a higher measurement frequency and with lower maximum concentrations and a specific measurement of carbon 14. Regarding radioactive releases, a new counting has been settled and activity of carbon 14 release is now measured and no longer calculated. The evolution of the French regulation leads to develop specific procedures and analytical techniques in chemistry and in radiochemistry (UV spectrometric methods, carbon 14 measurements,..) EDF NPP operators have launched a voluntarist process to reduce their releases since the beginning and before the evolution of the regulation. EDF priorities in terms of environment care lead henceforth to implement a global optimisation of the impact for a better control of releases. The new regulation will help EDF to reach its goals because it covers all the aspects in one administrative document: it is seen as a real simplification and a clarification towards public. In addition, this new regulation fits in with international practices which will allow an easier comparison of results between EDF and foreign NPP. These big environmental concerns lead EDF to create a national dedicated laboratory (LAMEN) in charge of developing specific measurement procedures to be implemented either by NPP or by sub-contractor laboratories. (authors)

  20. Disposal of spent nuclear fuel from NPP Krsko

    International Nuclear Information System (INIS)

    Mele, I.

    2004-01-01

    In order to get a clear view of the future liabilities of Slovenia and Croatia regarding the long term management of radioactive waste and spent nuclear fuel produced by the NPP Krsko, an estimation of disposal cost for low and intermediate level waste (LILW) as well as for spent nuclear fuel is needed. This cost estimation represents the basis for defining the target value for the financial resources to be accrued by the two national decommissioning and waste disposal funds, as determined in the agreement between Slovenia and Croatia on the ownership and exploitation of the NPP Krsko from March 2003, and for specifying their financial strategies. The one and only record of the NPP Krsko spent fuel disposal costs was made in the NPP Krsko Decommissioning Plan from 1996 [1]. As a result of incomplete input data, the above SF disposal cost estimate does not incorporate all cost elements. A new cost estimation was required in the process of preparation of the Joint Decommissioning and Waste Management Programme according to the provisions of the above mentioned agreement between Slovenia and Croatia. The basic presumptions and reference scenario for the disposal of spent nuclear fuel on which the cost estimation is based, as well as the applied methodology and results of cost estimation, are presented in this paper. Alternatives to the reference scenario and open questions which need to be resolved before the relevant final decision is taken, are also briefly discussed. (author)

  1. Improvement of waste release control in French NPP

    Energy Technology Data Exchange (ETDEWEB)

    Samson, T.; Lucquin, E.; Dupin, M. [EDF/GDL (France); Florence, D. [EDF/GENV (France); Grisot, M. [EDF/CNPE Saint Laurent (France)

    2002-07-01

    The new waste release control in French NPP is more restrictive than the old one and needs heavy investment to bring plants to compliance with it. The great evolutions are a chemical follow up on more chemicals with a higher measurement frequency and with lower maximum concentrations and a specific measurement of carbon 14. Regarding radioactive releases, a new counting has been settled and activity of carbon 14 release is now measured and no longer calculated. The evolution of the French regulation leads to develop specific procedures and analytical techniques in chemistry and in radiochemistry (UV spectrometric methods, carbon 14 measurements,..) EDF NPP operators have launched a voluntarist process to reduce their releases since the beginning and before the evolution of the regulation. EDF priorities in terms of environment care lead henceforth to implement a global optimisation of the impact for a better control of releases. The new regulation will help EDF to reach its goals because it covers all the aspects in one administrative document: it is seen as a real simplification and a clarification towards public. In addition, this new regulation fits in with international practices which will allow an easier comparison of results between EDF and foreign NPP. These big environmental concerns lead EDF to create a national dedicated laboratory (LAMEN) in charge of developing specific measurement procedures to be implemented either by NPP or by sub-contractor laboratories. (authors)

  2. Diagnostic systems developed in NPPRI (VUJE) Trnava Inc. for NPPs

    International Nuclear Information System (INIS)

    Kucharek, P.

    1998-01-01

    Since foundation of Nuclear Power Plant Research Institute (NPPRI) in 1977, the department of diagnostics has been dealt with problems related to the theoretical, practical and organizatory questions of operational diagnostics connected with PWR type nuclear components. This department acts directly in locality of NPP Jaslovske Bohunice, but there are performances for all NPP in Slovak or Czech Republic (Dukovany, Mochovce, and Temelin). Besides direct services and achievements for NPP there exist advisory, experts and research activities for the government and supervising authorities, too. In 1985, NPPRI began systematically construct and verify technical means for operational diagnostics of main circulating pumps (MCP) with good results, based on own rich practical experiences and contacts with organisations abroad. In recent years NPPRI as one of recognised qualified and authorised institutions in Slovak Republic has begun to develop a new generation of diagnostic systems for NPP on high technical level but with lower procuring costs in comparison with western countries products. This contribution deals with four following types of diagnostic systems which were not only developed but also delivered and installed on Slovak and Czech nuclear units: - Loose part monitoring system (LPMS), - Humidity monitoring system (HUMON), - Reactor coolant pumps monitoring system (RCPMS), - Primary circuit vibration monitoring system (VMS). Main features of new generation from middle of 1990's of these systems are described in this paper and operational experiences with them too. (author)

  3. Standard protocol for evaluation of environmental transfer factors around NPP sites

    International Nuclear Information System (INIS)

    Hegde, A.G.; Verma, P.C.; Rao, D.D.

    2009-01-01

    This document presents the standard procedures for evaluation of site specific environmental transfer factors around NPP sites. The scope of this document is to provide standard protocol to be followed for evaluation of environmental transfer factors around NPP sites. The studies on transfer factors are being carried out at various NPP sites under DAE-BRNS projects for evaluation of site specific transfer factors for radionuclides released from power plants. This document contains a common methodology in terms of sampling, processing, measurements and analysis of elemental/radionuclides, while keeping the site specific requirements also in place. (author)

  4. Core Knowledge Preservation and Transfer System Establishment and Utilization for NPP

    International Nuclear Information System (INIS)

    Kim, Bae-Joo; Kim, Gwang-Bong

    2008-01-01

    Knowledge is the most important factor in the safe and reliable operation of NPP. One generation has passed since we began to operate NPP in Korea. And then it became time to retire much experienced personnel in NPP. Although we have many kinds of knowledge sharing systems inside KHNP, we don't have any systematic experience knowledge preservation and transfer systems that are important for the operation of NPP. So we have lost important experience knowledge since we started operating. Especially, KHNP has adopted an internal promotion system as the human resource management policy, which induced frequent job position changes of staff members because there were job positions for a good promotion. Additionally, KHNP doesn't overlap jobs for long enough periods between previous staff and new staff when staff changes occur. With these reasons KHNP could not accumulate experience knowledge inside the company system. Therefore, KHNP could not preserve and transfer to the next generation the experience related to NPP operations systematically. To resolve these issues KNPEI performed a research project from March 2006 to September 2007. The purpose of this report is to introduce the experience knowledge preservation and transfer system that KNPEI has established and the utilization of the system

  5. Feature extraction and sensor selection for NPP initiating event identification

    International Nuclear Information System (INIS)

    Lin, Ting-Han; Wu, Shun-Chi; Chen, Kuang-You; Chou, Hwai-Pwu

    2017-01-01

    Highlights: • A two-stage feature extraction scheme for NPP initiating event identification. • With stBP, interrelations among the sensors can be retained for identification. • With dSFS, sensors that are crucial for identification can be efficiently selected. • Efficacy of the scheme is illustrated with data from the Maanshan NPP simulator. - Abstract: Initiating event identification is essential in managing nuclear power plant (NPP) severe accidents. In this paper, a novel two-stage feature extraction scheme that incorporates the proposed sensor type-wise block projection (stBP) and deflatable sequential forward selection (dSFS) is used to elicit the discriminant information in the data obtained from various NPP sensors to facilitate event identification. With the stBP, the primal features can be extracted without eliminating the interrelations among the sensors of the same type. The extracted features are then subjected to a further dimensionality reduction by selecting the sensors that are most relevant to the events under consideration. This selection is not easy, and a combinatorial optimization technique is normally required. With the dSFS, an optimal sensor set can be found with less computational load. Moreover, its sensor deflation stage allows sensors in the preselected set to be iteratively refined to avoid being trapped into a local optimum. Results from detailed experiments containing data of 12 event categories and a total of 112 events generated with a Taiwan’s Maanshan NPP simulator are presented to illustrate the efficacy of the proposed scheme.

  6. Nuclear Oversight Function at Krsko NPP

    International Nuclear Information System (INIS)

    Bozin, B.; Kavsek, D.

    2010-01-01

    The nuclear oversight function is used at the Krsko NPP constructively to strengthen safety and improve performance. Nuclear safety is kept under constant examination through a variety of monitoring techniques and activities, some of which provide an independent review. The nuclear oversight function at the Krsko NPP is accomplished by Quality and Nuclear Oversight Division (SKV). SKV has completed its mission through a combination of compliance, performance and effectiveness-based assessments. The performance-based assessment is an assessment using various techniques (observations, interviews, walk-downs, document reviews) to assure compliance with standards and regulations, obtain insight into performance, performance trends and also to identify opportunities to improve effectiveness of implementation. Generally, the performance-based approach to oversight function is based on some essential elements. The most important one which is developed and implemented is an oversight program (procedure). The program focuses on techniques, activities and objectives commensurate with their significance to plant operational safety. These techniques and activities are: self-assessments, assessments, audits, performance indicators, monitoring of corrective action program (CAP), industry independent reviews (such as IAEA's OSART and WANO Peer Review), industry benchmarking etc. Graded approach is an inherent product of a performance based program and ranking process. It is important not only to focus on the highest ranked performance based attributes but to lead to effective utilization of an oversight program. The attributes selected for oversight need to be based on plant specific experience, current industry operating experience, supplier's performance and quality issues. Collaboration within the industry and effective utility oversight of processes and design activities are essential for achieving good plant performance. So the oversight program must integrate relevant

  7. The Slovak nuclear regulatory authority and start-up of the Mochovce NPP

    International Nuclear Information System (INIS)

    Seliga, M.; Micankova, J.

    2000-01-01

    A major element of providing information is the demonstration that the area of nuclear energy uses has its binding rules in the Slovak Republic and the observance thereof is controlled by the state through an independent institution Slovak Nuclear Regulatory Authority (UJD). As early as 1995 were laid on the UJD the foundations of the concept of broadly keeping the public informed on UJD activity and the safety of nuclear installations by opening the UJD Information Centre that provides by its activity communications with the public and mass media, which is instrumental in creating in the public a favourable picture of the independent state nuclear regulation. Clear communication policy is the key to credibility and is based on perceptions which give ride to varying levels of confidence. It has been consistently found in opinion research that credibility is the single most powerful persuasive force. Public communication programmes are the principal currency for the Regulatory Authority to inform the public on issues like costs, benefit requirements and risks

  8. NPP capital equipment life control facilities and tools

    International Nuclear Information System (INIS)

    Nekrasov, A.V.; Proskuryakov, K.N.

    2009-01-01

    Algorithms and simulation package for calculation of eigen modes of coolant pressure oscillations in equipment of primary coolant circuit of WWER-1000 NPP, tuned-circuit Q-factor of an oscillating contour of the coolant, fluctuation frequencies pass band and attenuation factors of were developed. Calculation results for cases of presence and absence of gaseous state radiolysis products in the coolant were obtained. Results analysis makes it possible to disclose operating conditions which result in raised vibrations, and to develop control response in NPP industrial control system for their prevention [ru

  9. Study on the risk-informed regulation of NPP

    International Nuclear Information System (INIS)

    Wang Chaogui

    2007-01-01

    The risk-informed regulation is a modern type of NPP safety management mode using both deterministic and probabilistic approaches. It is necessary to entirely and systematically study the associated regulations, standards and practices in order to promote the developments of risk-informed regulations in China. This paper introduces the risk-informed regulation, gives out the basic principles, method and acceptance risk criteria of risk-informed decision,making, discusses the PSA requirements for risk-informed decision-making and makes some suggestions about the application of risk-informed regulations in Chinese NPP. (authors)

  10. Methodology transfer for the preparation of NPP decommissioning for leading personnel of the Ignalina NPP and for the representatives of Lithuanian authorities

    International Nuclear Information System (INIS)

    Ackermann, L.; Baecker, A.

    2004-01-01

    At request of the Lithuanian government to receive support for the preparation of the decommissioning of Ignalina NPP, a bilateral project was financed by the German federal government to transfer experience from the decommissioning of the Greifswald and Rheinsberg NPPs to the management staff of the Ignalina NPP and to the representatives of the Lithuanian authorities in charge of the decommissioning. The methodology transfer project was prepared and carried out under the leadership of the Gesellschaft fuer Anlagen- und Reaktorsicherheit (GRS) mbH. The practical implementation was within the responsibility of Energiewerke Nord GmbH (EWN) in cooperation with other German subcontractors. The methodology transfer comprised the task fields of project management, project planning, licensing procedure and waste management as well as social aspects of the further development of the industrial site. Five intensive one-week seminars were conducted mainly at the Greifswald NPP site and the knowledge gained was then consolidated in two evaluation seminars at the Ignalina NPP. As the basis for the training realised in 2002 and 2003, EWN provided about 2000 power-point illustrations, more than 200 transparencies and four video films. The training handouts produced by EWN were delivered to the seminar participants in Russian and English language and documented in the database ''Technische Dokumentation Ost'' (DOKU OST) of GRS. (orig.)

  11. NPP Krsko full scope simulator verification and qualification

    International Nuclear Information System (INIS)

    Krajnc, B.; Glaser, B.; Novsak, M.; Spiler, J.

    1998-01-01

    NPP Krsko (NEK) will, as a part of the Modernization plan, obtain also Krsko Full Scope Simulator (KFSS). Contract has been awarded to CAE Electronics for the design, construction and integration. KFSS will support in real time, the training for the complete range of operation, which can be performed from the main control room and some selected plant areas (remote shutdown panels, etc). Based on the lessons learned on development of NPP Krsko Basic Principle Simulator we decided for active approach. That means that NPP Krsko personnel will be heavily involved into all phases of KFSS development and testing. Since NPP Krsko is going to replace the existing steam generators, raise the nominal power and perform necessary modifications to support the power uprate, it was decided that the development of the KFSS will be conducted in two steps: 1. Development of the models as well as all the hardware interface in the MCR for the existing plant Cycle 15 and then, 2. Models and hardware will be modified, added or replaced as needed to take into account the steam generator replacement and plant uprate projects. In spite of the fact that the simulator will be used for the training of the plant operators for the uprated conditions and with new steam generators, the upper described approach was selected since we want to be sure that the models will at the beginning adequately simulate the existing plant. For the existing conditions we have available reference data for different plant conditions, as well as data for different plant transients. By verifying that simulator will be able adequately simulate the existing conditions the level of confidence for the uprated simulator will be much higher. This is of special importance since it will support initial training for modernized plant conditions. In this paper the plan for verification and qualification of KFSS as well as the amount of the work needed on NPP Krsko side to develop the test acceptance criteria will be presented.(author)

  12. Selection of index complex for the NPP operator activity efficiency

    Energy Technology Data Exchange (ETDEWEB)

    Kolesnik, A I; Chertorizhskij, E A

    1984-01-01

    Preconditions for choice of NPP operator activity efficiency index are determined. Results of the choice are given and a method for determination of generalized and particular parameters by means of which NPP operator activity efficiency can be estimated is considered. An algorithm of diagnosis of reason for unsuccess of operator activity based on assessment of psychological factors of complicacy is suggested.

  13. Joint probability safety assessment for NPP defense infrastructure against extreme external natural hazards

    International Nuclear Information System (INIS)

    Guilin, L.; Defu, L.; Huajun, L.; Fengqing, W.; Tao, Z.

    2012-01-01

    With the increasing tendency of natural hazards, the typhoon, hurricane and tropical Cyclone induced surge, wave, precipitation, flood and wind as extreme external loads menacing Nuclear Power Plants (NPP) in coastal and inland provinces of China. For all of planned, designed And constructed NPP the National Nuclear Safety Administration of China and IAEA recommended Probable Maximum Hurricane /Typhoon/(PMH/T), Probable Maximum Storm Surge (PMSS), Probable Maximum Flood (PMF), Design Basis Flood (DBF) as safety regulations for NPP defense infrastructures. This paper discusses the joint probability analysis of simultaneous occurrence typhoon induced extreme external hazards and compare with IAEA 2006-2009 recommended safety regulation design criteria for some NPP defense infrastructures along China coast. (authors)

  14. Safety enhancement concept for NPP of new generation with VVER reactors

    International Nuclear Information System (INIS)

    Bezlepkin, V.; Kukhtevich, I.; Semashko, S.; Svetlov, S.; Solodovnikov, A.

    2004-01-01

    With the present day conditions, in order to successfully promote new NPP designs in the electric power markets, it is necessary to ensure enhanced technical/economic performances provided that international safety requirements are properly adhered to. When compared with high-powered nuclear power plants, NPP VVER-640 design (medium powered) possesses a number of advantages for the regions with undeveloped energy systems. Reduced specific energy intensity of the core adopted in this type of reactor allows to ensure the emergency cooldown of the reactor plant by passive means and to minimize the 'human factor' risk and external effects and provide sound substantiations as to how to retain corium inside RPV in case of severe accidents. At the same time, high-powered NPPs seem to be promising for regions with developed energy systems. Among such designs, NPP VVER-1000 and VVER-1500 designs are the most desirable. Configuration of new generation NPP with VVER-1500 is to be selected based on the gained experience in designing NPPs of previous generations considering the latest safety requirements and situation in the domestic and global energy markets for the time being and in the short run. Recent IAEA publications and latest EUR requirements insist that the following key safety indices should be established for new NPP designs: - aggregated frequency of core melting is 10 -6 (1/year); - frequency of maximum accident release is 10 -7 (1/year). To meet the aforementioned criteria, it is necessary to implement some safety assurance principles recommended by IAEA (in-depth defence, single failure, redundancy, diversity, etc.), application of deterministic and probabilistic methods for selection of safety assurance activities and means and use of reasonable combination of active and passive systems. Application of VVER-640 concept to high-powered NPPs seems to be a formidable task due to a number of reasons, namely, it is quite difficult to carry out cooldown process

  15. Tritium monitoring at NPP and enviromental area under survey

    International Nuclear Information System (INIS)

    Nurislamov, I.R.; Kham'yanov, L.P.; Panichkin, V.F.

    1983-01-01

    Methods and devices for tritium monitoring at NPP with the WWER-type reactors and the environment are described. Aqueous solutions of inorganic and organic compounds, water vapours in the air of NPP rooms and the environment atmosphere, free and bound water in soils and vegetation were the objects for monitoring. Methods of tritium sampling from the atmosphere as well as determination of its content in samples are presented. Special attention is paid to sample enrichment with tritium

  16. NPP Temelin safety analysis reports and PSA status

    International Nuclear Information System (INIS)

    Mlady, O.

    1999-01-01

    To enhance the safety level of Temelin NPP, recommendations of the international reviews were implemented into the design as well as into organization of the plant construction and preparation for operation. The safety assessment of these design changes has been integrated and reflected in the Safety Analysis Reports, which follow the internationally accepted guidelines. All safety analyses within Safety Analysis Reports were repeated carefully considering technical improvements and replacements to complement preliminary safety documentation. These analyses were performed by advanced western computer codes to the depth and in the structure required by western standards. The Temelin NPP followed a systematic approach in the functional design of the Reactor Protection System and related safety analyses. Modifications of reactor protection system increase defense in depth and facilitate demonstrating that LOCA and radiological limits are met for non-LOCA events. The rigorous safety analysis methodology provides assurance that LOCA and radiological limits are met. Established and accepted safety analysis methodology and accepted criteria were applied to Temelin NPP meeting US NRC and Czech Republic requirements. IAEA guidelines and recommendations

  17. Low level radioactive waste disposal in Kozloduy NPP in Bulgaria

    International Nuclear Information System (INIS)

    Stanchev, V.

    2001-01-01

    Kozloduy NPP is the biggest power plant in the Republic of Bulgaria. It is in operation since 1974 and for the past 25 years it has generated over 263 billion kWh electric power. The NPP share in the total electric production in 1998 was about 50%. It has six units in operation - four WWER 440 B-230 and two WWER 1000 B-320. In the nuclear reactor operation the generation of radioactive waste (RAW) is an inevitable process. The waste must be conditioned, stored and disposed of in a safe manner. There are no national radioactive waste disposal facilities, for waste generated by an NPP, in Bulgaria to the moment. This situation necessitates the storage of operational RAW to be carried out on site for a long period of time (30 to 50 years). Following the principle for protection of human health and environment now and in the future, Kozloduy NPP adopted the concept for conditioning the RAW to a stable solid form and placing the waste in a package which should keep its features for a sufficiently long term so that the package can be safely transported to the disposal site. (author)

  18. An Analysis of Cyber-Attack on NPP Considering Physical Impact

    Energy Technology Data Exchange (ETDEWEB)

    Lee, In Hyo; Kang, Hyun Gook [KAIST, Daejeon (Korea, Republic of); Son, Han Seong [Joonbu University, Geumsan (Korea, Republic of)

    2016-05-15

    Some research teams performed related works on cyber-physical system which is a system that cyber-attack can lead to serious consequences including product loss, damage, injury and death when it is attacked. They investigated the physical impact on cyber-physical system due to the cyber-attack. But it is hard to find the research about NPP cyber security considering the physical impact or safety. In this paper, to investigate the relationship between physical impact and cyber-attack, level 1 PSA results are utilized in chapter 2 and cyber-attack analysis is performed in chapter 3. The cyber security issue on NPP is inevitable issue. Unlike general cyber security, cyber-physical system like NPP can induce serious consequences such as core damage by cyber-attack. So in this paper, to find how hacker can attack the NPP, (1) PSA results were utilized to find the relationship between physical system and cyber-attack and (2) vulnerabilities on digital control systems were investigated to find how hacker can implement the possible attack. It is expected that these steps are utilized when establishing penetration test plans or cyber security drill plans.

  19. Survey of public participation potential regarding the Muria NPP program

    International Nuclear Information System (INIS)

    Yarianto-SBS; Sri Hariani Syarif; Heni Susiati; Imam Hamzah; Fepriadi

    2003-01-01

    Socio-culture aspect is a part of site feasibility evaluation of Nuclear Power Plant (NPP)program. Indonesia is under going democratization, therefore the paradigm of development has also been changed where the people have freedom or liberty and they can express their opinion independently. The people are significant factor that involving in the decision making of regional development.Even the socio-culture, such as social riot can reject the site. Therefore socio-culture aspect should be considered in the NPP site evaluation. The first step of the study,mapping of public participation potential should be conducted by field survey. The method used in there search is quantitative approach with field survey guided by questioner without any treatment of object sampled. Qualitative approach was also conducted by in-depth interview technique to collect more detailed information. Information were collected from general public without any stratification in the 10 km radius from NPP site. Sampling method used was full random sampling technique. The results of survey show that the most of the people have significant potential for participating in the NPP Program. Conducive atmosphere should be maintained by social setting, therefore the present good momentum will not be lost. (author)

  20. An Analysis of Cyber-Attack on NPP Considering Physical Impact

    International Nuclear Information System (INIS)

    Lee, In Hyo; Kang, Hyun Gook; Son, Han Seong

    2016-01-01

    Some research teams performed related works on cyber-physical system which is a system that cyber-attack can lead to serious consequences including product loss, damage, injury and death when it is attacked. They investigated the physical impact on cyber-physical system due to the cyber-attack. But it is hard to find the research about NPP cyber security considering the physical impact or safety. In this paper, to investigate the relationship between physical impact and cyber-attack, level 1 PSA results are utilized in chapter 2 and cyber-attack analysis is performed in chapter 3. The cyber security issue on NPP is inevitable issue. Unlike general cyber security, cyber-physical system like NPP can induce serious consequences such as core damage by cyber-attack. So in this paper, to find how hacker can attack the NPP, (1) PSA results were utilized to find the relationship between physical system and cyber-attack and (2) vulnerabilities on digital control systems were investigated to find how hacker can implement the possible attack. It is expected that these steps are utilized when establishing penetration test plans or cyber security drill plans

  1. Implementation of the II. Stage decommissioning of A1 NPP

    International Nuclear Information System (INIS)

    Ficher, T.

    2015-01-01

    Presentation is focused on the implementation of the II. stage decommissioning of A1 NPP. Introductory part focuses on brief characteristics of the power plant with a history of operation, basic technical parameters and actions that were made after operation. The next section describes the basic schedule for decommissioning, structure of management and implementation of the II. stage decommissioning of the A1 NPP and objectives of the individual stages. The last and largest part of the presentation is devoted to detailed description of the II. stage decommissioning of the A1 NPP, its individual tasks and verbal and visual description of the activities that were performed. Presented is decommissioning of the technology and construction of external objects NPP A1 including storage tanks for liquid RAW, next are presented activities carried out in the Main Production Unit - decommissioning of non-operating technologies in various places/rooms, management of waste arising from these activities, treatment of case of A1 long-term spent fuel storage and long-term spent fuel storage. The subsequent section is devoted to the management and handling of contaminated soil, concrete and construction waste, including management of VLLW. (authors)

  2. Planning and management support for NPP personnel SAT-based training programmes. IAEA regional workshop. Working material

    International Nuclear Information System (INIS)

    1998-01-01

    Within the European regional TC Project a workshop on Planning and Management Support for NPP Personnel SAT Based Training programmes was held at the Paks NPP Maintenance Training Centre in June 1998. It was organized jointly by IAEA and the Paks NPP. The objective of the workshop was to present the important experience gained by successful implementation of the IAEA Model Project on Strengthening Training for Safe Operation at Paks NPP as well as international experience in developing and carrying out the projects to upgrade NPP personnel training in particular maintenance training, and competence based Systematic Approach to Training (SAT). Twenty five participants from Armenia, Bulgaria, China, Czech republic, Hungary, Romania, Russia, Slovak Republic and Ukraine attended the workshop presenting and exchanging experiences in implementing NPP SAT-based training programmes

  3. Assessment of NPP safety taking into account seismic and engineering-geological factors

    International Nuclear Information System (INIS)

    Yakovlev, E.A.

    1990-01-01

    Consideration is given to the problem of probabilistic analysis of NPP safety with account of risk of destructive effect of earthquakes and the danger of accidental geological processes (diapirism, karst etc.) under NPP operation. It is shown that account of seismic and engineering-geological (engineering-seismological) risk factors in probabilistic analysis of safety enables to perform anticipatory analysis of behaviour of principle plant objects and to improve safety of their operation by revealing the most unstable elements of geotechnical system forming the main contribution to the total NPP risk

  4. Cernavoda NPP impact study on terrestrial and aquatic biota. Preliminary results

    International Nuclear Information System (INIS)

    Bobric, Elena; Bucur, Cristina; Popescu, Ion; Simionov, Vasile; Titescu, Gheorghe; Varlam, Carmen

    2010-01-01

    Recently, the awareness of the vulnerability of the environment has increased and the need to protect it against industrial pollutants has been recognized. The concept of sustainable development, requires new and developing international policies for environmental protection. See 'Protection of the environment from the effects of ionizing radiation' IAEA-TECDOC-1091, International Atomic Energy Agency, Vienna. As it is recommended in 'Cernavoda Unit No. 2 NPP Environmental Impact Assessment CES-03702-IAD-006', it is Cernavoda NPP responsibility to conduct an Ecological Risk Assessment study, mainly to assess the impact of nuclear power plant operation on terrestrial and aquatic biota. Long records from normal operation of Cernavoda Unit 1, wind pattern, meteorological conditions, and source terms data were used to evaluate areas of interest for environmental impact, conducting to a circle of 20 km radius around mentioned nuclear objective. The screening campaign established tritium level (because Cernavoda NPP is a CANDU type reactor, and tritium is the most important radioisotope evacuated in the environment) in air, water, soil and vegetation, focusing the interest area on particular ecosystem. Using these primary data it was evaluated which are the monitored ecological receptors and which are the measurement endpoints.This paper presents the Ecological Risk Assessment at Cernavoda NPP technical requirements, and the preliminary results of evaluating criteria for representative ecosystem components at Cernavoda NPP. (authors)

  5. Regulatory review of NPP Krsko Periodic Safety Review

    International Nuclear Information System (INIS)

    Lovincic, D.; Muehleisen, A.; Persic, A.

    2004-01-01

    At the request of the Slovenian Nuclear Safety Administration (SNSA), Krsko NPP prepared a Periodic Safety Review (PSR) program in January 2001. This is the first PSR of NPP Krsko, the only nuclear power plant in Slovenia. The program was reviewed by the IAEA mission in May 2001 and approved by SNSA in July 2001. The program is made in accordance with the IAEA Safety Guide 'Periodic Safety Review of Operational Nuclear Power Plants' No. 50-SG-012 and with European practice. It contains a systematic review of operation of the NPP Krsko, including the review of the changes as a result of the modernization of the facility. The main tasks of PSR are review of plant status for each safety factor, development of aging and life cycle management program, review of seismic design and PSHA analysis and update of regulatory compliance program. The prioritization process of findings and action plan are also important tasks of PSR. The basic safety factors of the PSR review are: Operational Experience, Safety Assessment and Analyses, Equipment Qualification and Ageing Management, Safety Culture, Emergency Planing, Environmental Impact and Radioactive Waste, Compliance with license requirements and Prioritization. It had been agreed that SNSA will have reviewed all PSR reports generated during the PSR process. At the end of 2003 the PSR Summary Report with selected recommendations for action plan was completed and delivered to SNSA for review. The paper presents regulatory review of NPP Krsko PSR with emphasis on the evaluation of the PSR issues ranking process. (author)

  6. Nonlinear modal analysis in NPP dynamics: a proposal

    International Nuclear Information System (INIS)

    Suarez Antola, R.

    2005-07-01

    We propose and briefly suggest how to apply the analytical tools of nonlinear modal analysis (NMA) to problems of nuclear reactor kinetics, NPP dynamics, and NPP instrumentation and control. The proposed method is closely related with recent approaches by modal analysis using the reactivity matrix with feedbacks to couple neutron kinetics with thermal hydraulics in the reactors core. A nonlinear system of ordinary differential equations for mode amplitudes is obtained, projecting the dynamic equations of a model of NPP onto the eigenfunctions of a suitable adjoint operator. A steady state solution of the equations is taken as a reference, and the behaviour of transient solutions in some neighbourhood of the steady state solution is studied by an extension of Liapunov's First Method that enables to cope directly with the non-linear terms in the dynamics. In NPP dynamics these differential equations for the mode amplitudes are of polynomial type of low degree A few dominant modes can usually be identified. These mode amplitudes evolve almost independently of the other modes, more slowly and tending to slave the other mode amplitudes. Using asymptotic methods, it is possible to calculate a closed form analytical approximation to the response to finite amplitude perturbations from the given steady spatial pattern (the origin of the space of mode amplitudes).When there is finite amplitude instability, the method allows us to calculate the threshold amplitude as a well defined function of system's parameters. This is a most significant accomplishment that the other methods cannot afford

  7. The main trends of work on lifetime management of NPP

    International Nuclear Information System (INIS)

    Dragunov, Yu.; Kurakov, Yu.

    1995-01-01

    The major trends of works on NPP lifetime management are discussed: Co-ordinating and organizational activities; studying the degradation processes and residual life; elaboration and implementation of the measures to maintain/enhance safety level of NPPs operating within design life; development of control principals of advanced NPPs aging and safe life; creation and development of regulations in the field of NPP aging and life management. 7 figs

  8. Balancing preventive and corrective maintenance in Cernavoda Unit 1 NPP

    International Nuclear Information System (INIS)

    Riedel, M.; Marinescu, S.

    2000-01-01

    The paper presents a short reminder of Romania's Cernavoda NPP entering commercial operation and a brief description of the CANDU-6 project on which Unit 1 is based. The short term objectives of the maintenance management, the status of the existing maintenance programmes as well as future predictable maintenance programmes are outlined together with the Government plan to complete the balance of NPP. (author)

  9. Preventing degradation and in-service inspection of NPP steam generator

    International Nuclear Information System (INIS)

    Ding Xunshen

    1999-01-01

    The author describes the degradation of steam generator tubes in initial operating stage of France NPP. The author emphatically presents the preventive measures to tackle degradation and In-service inspection of Daya Bay NPP 1 unit as a guarantee of safety operation, including secondary side water chemistry monitoring and controlling, leakage rate monitoring, eddy-current inspection, mechanical cleaning, cleanliness inspection, foreign objects removal and etc

  10. Monitoring of Persons at the Exit from Bohunice NPP

    International Nuclear Information System (INIS)

    Kaizer, J.; Svitek, J.

    2001-01-01

    Full text: IAEA defines the principal requirement 'defence in depth' as a multilayer system in its authorised document - International Basic Safety Standards for Protection against Ionising Radiation, Safety Series No. 115. The principle of the multilayer system is: a failure at one zone is compensated or corrected at subsequent zones. The main argument why Bohunice NPP modernised its monitoring system at the exit from NPP was the implementation of the principle 'defence in depth'. Several instruments PM7 (Eberline) equipped with the plastic scintillation detectors had been bought because of the modernisation. The instruments had to be integrated into overall security system NPP without any restriction to the number of passing people. The supplier had to modify the basic instrument operation. NPP required a 'dynamic' monitoring version, this means the operation without stopping of a person within the instrument. After the modification the value of the RDA (Reliable Detectable Activity) of the instruments PM7 was within the interval 9.25-10.4 kBq for 137 Cs (dotted source in the middle of the instrument). RDA for the mix of activation products was 2-3 times lower. In conclusion of our paper the results of the monitoring are presented within tree years as well as a discussion about these results. Maximum values of contaminations measured were very low (several kBq) that represented very low risk from potential exposure. (author)

  11. Environmental impact assessment of NPP decommissioning

    International Nuclear Information System (INIS)

    Hinca, R.

    2009-01-01

    In this presentation the following potential impacts of decommissioning of NPP are discussed: - Impacts on population; Impacts on natural environment; Land impacts; Impacts on urban complex and land utilisation; Possible impacts on area as a result of failure.

  12. LTO License Application Project NPP Borssele

    International Nuclear Information System (INIS)

    Jong, A.E. de; Blom, F.J.; Leilich, J.

    2012-01-01

    Borssele NPP plans to extend its operating life with 20 years until 2034. Borssele has started the project LTO 'bewijsvoering' (LTO 'Justification') in order to meet the requirements of the Dutch regulator. The outline of the project is based on IAEA safety guide 57 'Safe Long Term Operation of Nuclear Power Plants'. This paper describes the contents and coherence of the different parts in the project and how these respond to the IAEA guidelines on LTO. The goal of the project LTO 'bewijsvoering' is to ensure that safety and safety relevant systems, structures and components continue to perform their intended functions during long term operation. The outcome of the project LTO 'bewijsvoering' will be used for a license change application and this will be submitted to the Dutch regulator KFD for approval of prolonged operation of Borssele NPP after 2013. (author)

  13. Structure study and design of Qinshan NPP PCCV

    International Nuclear Information System (INIS)

    Xia Zufeng; Xu Yongzhi; Wang Tianzhen; Wu Jibiao

    1993-02-01

    The design process of Qinshan NPP (nuclear power plant) PCCV (prestressed concrete containment vessel) is summarized. The tendon test, structural description, design bases and analysis method are introduced. The arrangement for preventing concrete from cracking and design features of post-tensioning system and steel liner are presented. The results of model test and non-linear analysis for ultimate load in Qinshan NPP PCCV are also given. Through the integrity test of PCCV, it shows that the test values are in agreement with predicted values, the structure is excellent and the performance of leak tightness conforms to the safety requirements

  14. Corrosion strength monitoring of NPP component residual lifetime

    International Nuclear Information System (INIS)

    Denisov, V.G.; Belous, V.N.; Arzhaev, A.I.; Shuvalov, V.A.

    1994-01-01

    Importance of corrosion and fatigue monitoring; types of corrosion determine the NPP equipment life; why automated on-line corrosion and fatigue monitoring is preferable; major stages of lifetime monitoring system development; major groups of sensors for corrosion and strength monitoring system; high temperature on-line monitoring of water chemistry and corrosion; the RBMK-1000 NPP unit automatic water chemistry and corrosion monitoring scheme; examples of pitting, crevice and general corrosion forecast calculations on the basis of corrosion monitoring data; scheme of an experimental facility for water chemistry and corrosion monitoring sensor testing. 2 figs., 4 tabs

  15. NPP life management program - status report for Slovenia

    International Nuclear Information System (INIS)

    Glumac, B.

    1998-01-01

    Status report on NPP life management in Slovenia is dealing with possible life extension of NPP Krsko which comprises: replacement of steam generator; power upgrade; exchange of plant process computer; snubber reduction program, additional forced ventilation cooling system. Fuel improvements are predicted as well as the problems of storing spent fuel, low and intermediate waste if the plant is to operate through 2023 and possibly beyond that date. Related research activities are concerned with radiation damage, modelling of reactor core parameters by Monte Carlo calculations and PSA and severe accidents studies. Most of the activities are performed in cooperation with foreign organisations

  16. Dukovany NPP operation

    International Nuclear Information System (INIS)

    Vlcek, Jaroslav

    2010-01-01

    The topics discussed include: Dukovany NPP among CEZ Group power plants; International missions at the plant; Plant operation results; and Strategic goals and challenges. Historical data are presented in the graphical form, such as the unit capacity factor, unplanned capability loss factor, unplanned automatic scrams, fuel reliability, industrial safety accident rate, collective radiation exposure, WANO index, power generation data, and maximum achievable power by the end of year. Also discussed were the company culture and human resources, maintenance, power uprate, and related phenomena. (P.A.)

  17. Studying the sampling representativeness in the NPP ventilation ducts

    International Nuclear Information System (INIS)

    Sosnovskij, R.I.; Fedchenko, T.K.; Minin, S.A.

    2000-01-01

    Measurements of the gas and aerosol voluminous activity in the NPP ventilation ducts are an important source of information on the radiation contaminants ingress into the environmental medium. These measurements include sampling, samples transport and proper measurements. The work is devoted to calculation of metrological characteristics of the sampling systems for the NPP gas-aerosol releases by different parameters of these systems and ventilation ducts. The results obtained are intended for application by designing such systems and their metrological certification [ru

  18. EOPs at NPP Temelin: Analytical support for EOPs verification

    International Nuclear Information System (INIS)

    Bica, M.

    1999-01-01

    The process of implementation of symptom-based emergency operating procedures (EOPs) started at the NPP Temelin in 1993. The process has the following phases: development of symptom-based EOPs; EOPs verification; EOPs validation; operating personnel training; EOPs control and experience feedback. The development of Temelin specific EOPs was based on technology and know-how transfer using the Emergency Response Guidelines Methodology developed by the Westinghouse Owner Group. In this lecture the implementation of symptom-based EOPs in the the NPP Temelin is described

  19. The changing of land use and land management in Ignalina NPP region

    International Nuclear Information System (INIS)

    Milius, J.; Ribokas, G.

    1998-01-01

    The investigated locality (Ignalina NPP) represents territory of NPP and Visaginas town as well as agrarian territories of three former environs Dukshtas and Rimshe (Ignalina district) and Turmantas (Zarasai district). The changes of land, started with the beginning of construction works of NPP (1974) and are still taking place, are analyzed. The data on the land fund and current data of land reform agrarian services were used. The changes of the plots of farming lands in agrarian territories were preconditioned by the same factors which operated in other territories of hilly agrarian landscape. In the drained terrains the plots of farming lands increased, whereas, in other territories re naturalization processes set in resulting in the increase of the areas covered with forests and bushes which were not used for agricultural purposes. Thus, we may assert that the impact of the NPP itself on the change of the structure of farming lands in agrarian territories was minimal. It manifested not as a permanent process but as a spontaneous fact - a mechanical allotment of a plots of land for building the NPP and town itself. The comparison of the structure of farming lands at the moment of allotment with the data of 1995 revealed that during the mentioned period the farming land were completely destroyed (1003 ha of ploughed lands, 168 ha - grasslands, 180 ha - pastures). The forest area was reduced by 625 ha. The destroyed farming lands were occupied by territories under buildings (719 ha), artificial ground cover (159 ha), and high tension current lines (over 800 ha) which are absolutely unfit neither for agriculture nor forestry. Though the NPP and Visaginas town exerted no appreciable influence on the structure of farming lands in the surrounding territories they substantially changed the territory of NPP and Visaginas. The former wooded - agrarian landscape was replaced by an untypical for these places technical - urbanized landscape. This should be taken into

  20. Ideal scaling of BETHSY 9.1.B test results to NPP

    International Nuclear Information System (INIS)

    Petelin, S.; Guntel, I.

    1995-01-01

    The transient scenario standard problem 27 (ISP-27) was implemented in the RELAP5 analysis of small break loss of coolant accident for Krsko nuclear power plant (Krsko NPP). The objective was to evaluate the effectiveness of ISP-27 proposed accident management procedure for real NPP and to compare the physical phenomena known from experimental background with the phenomena predicted by RELAP5 simulation of real plant transient. The analyses showed that, if relevant break, power scaling criteria, primary and secondary pressure are fulfilled the RELAP5 model of Krsko NPP cannot completely ensure the simulation of typical thermal-hydraulic phenomena observed in BETHSY facility during ISP-27. Much better satisfaction is observed on ideal scaled up model. (author)

  1. The EC TACIS project 'Social impact of closing Chornobyl NPP' objectives, tasks and intended outcomes

    International Nuclear Information System (INIS)

    Schoen, A.

    2001-01-01

    Being part of the common activities of Slavutich and ChNPP, our EC TACIS project representatives already actively participated in the elaboration of the state programme aimed to ensure the social security of the ChNPP personnel and the population of Slavutich in the result of the final shut down of ChNPP

  2. Distinct characteristics of NPP HRD and establishment of KINGS in Korea

    International Nuclear Information System (INIS)

    Namgung, Ihn

    2013-01-01

    Full text:Korean government set-up nuclear energy department within the ministry of education in 1956 and joined IAEA in 1957 and set up nuclear energy agency in 1959, and installed the first research reactor in 1962. The Korean Government started constructing NPP in 1971 that had started commercial operation in 1978. The first oil shock in 1973 had devastated Korean economy and that made Korean Government to accelerate the construction of NPPs. Since then Korea steadily constructed NPP as well as invested in the development of indigenized NPP technology. During 1990s, Korea developed KSNP PWR 600 MWe NPP and in the last decade Korea developed APR1400 MWe NPP. Through the time, the engineers and operators involved in every field of nuclear industry is getting old and started to retire. Someone freshly out from the university with bachelor or post graduate degree will take many years to be able to understand how things running and operating in nuclear industry. Even in many years of job assignment, one cannot experience and understand all aspect of nuclear industry. It is this reason to establish a special educational system to teach people already in the field and to be able to see the whole picture by systematically teaching most of the related subject. In order to prevent any influence from existing university system, it was determined to establish KINGS (KEPCO International Nuclear Graduate School) as separate and independent institution and as a post-graduate institution. The curriculum of KINGS was set up along this philosophy, and has only one academic department, for example NPP Engineering Department, to make more interactions among faculty and students. Also the curriculum is set up to teach practical experience; hence the graduates can bridge between industry and academia as well as fill in the large gap of technical experience of older generation. Also another aim is to make KINGS international institution to share experience of Korean NPP development

  3. Start-up of NPP Krsko; Pokusno obratovanje NE Krsko

    Energy Technology Data Exchange (ETDEWEB)

    Spiler, J; Aralica, J [Nuklearna elektrana Krsko, Krsko (Yugoslavia)

    1984-07-01

    The report describes a review of start-up program and its realisation. There are also described some more significant start-up results with their evaluation. The most significant operation criteria are compared between NPP Krsko and other similar plants in the world. The comparison shows that after the first contractors and operation personnel efforts have been accomplished, our first nuclear power plant is a safe and reliable source of electric power. At the end there are listed NPP Krsko start-up recommendations and experience. (author)

  4. Eco information 4. Influence of operation of the plants Jadrova vyradovacia spolocnost, a.s., on the environment, Locality of Mochovce, within April 2014

    International Nuclear Information System (INIS)

    2014-05-01

    In this leaflet the results of monitoring of radioactive gaseous and liquid effluents into the Hron River as well as of radiation monitoring of Mochovce Liquid RAW Final Treatment Facility (FS KRAO) and Mochovce Radioactive Waste Repository (RU RAO) are presented. The radioactive effluents into hydrosphere within February 2014 for the radioactive effluents into hydrosphere within for FS KRAO were: 1.011 GBq of tritium (1.011 for the period January - April 2014 (0.36% of AL)) and summary of gamma-radionuclides 0.479 GBq (0.944 GBq for the period January - April 2014 (24.21% of AL)). The radioactive effluents into hydrosphere within April 2014 for FS KRAO were: 62 kBq of 90 Sr (62 kBq for the period January - March 2014 (0.003% of AL)), 0.003 kBq of summary alpha (0.003% of AL) and 1847 kBq of 14 C (1847 kBq for the period January - March 2014). The radioactive effluents into hydrosphere within April 2014 for RU RAO were: 0.568 MBq of tritium (4.544 MBq for the period January - April 2014 (0.024% of AL)); 0.004 MBq of 137 Cs (0.033 MBq for the period January - April 2014 (0.145% of AL)); 0.119 MBq of 90 Sr - the value of the quarterly (0.119 MBq for the period January - March 2014 (0.049% of AL)); 0.008 MBq of 60 Co (0.031 MBq for the period January - April 2014 (0.138% of AL)); 0.005 MBq of 239 Pu (0.005 MBq for the period January - March (0.892% of AL)). Volume of liquid effluents in April 2014 was 227 m 3 (186 m 3 for the period January - April 2014). The radioactive effluents into atmosphere within April 2014 for FS KRAO were: 0.0005 MBq of gamma radionuclides (0.0018 MBq for the period January - April 2014, that is 0.0023% of annually limit (AL)); 0.022 MBq of alpha radionuclides (0.022 MBq for the period January - March (0.0022% of AL)), and 0.149 MBq of 89 Sr and 90 Sr - the value of the quarterly (0.149 MBq for the period January - March 2014 (0.0075% of AL)).

  5. Eco information 2. Influence of operation of the plants Jadrova vyradovacia spolocnost, a.s., on the environment, Locality of Mochovce, within February 2014

    International Nuclear Information System (INIS)

    2014-03-01

    In this leaflet the results of monitoring of radioactive gaseous and liquid effluents into the Hron River as well as of radiation monitoring of Mochovce Liquid RAW Final Treatment Facility (FS KRAO) and Mochovce Radioactive Waste Repository (RU RAO) are presented. The radioactive effluents into hydrosphere within February 2014 for the radioactive effluents into hydrosphere within for FS KRAO were: 0.0000 GBq of tritium (9.0000 for the period January - February 2014 (0.00% of AL)) and summary of gamma-radionuclides 0.0000 GBq (0.0000 GBq for the period January - February 2014 (0.00% of AL)). The radioactive effluents into hydrosphere within February 2014 for FS KRAO were: 0.000 kBq of 90 Sr (0.000% of AL)), 0.000 kBq of summary alpha (0.000% of AL) and 0.000 kBq of 14 C (0.000% of AL). The radioactive effluents into hydrosphere within February 2014 for RU RAO were: 2.272 MBq of tritium (3.976 MBq for the period January - February 2014 (0.021% of AL)); 0.017 MBq of 137 Cs (0.029 MBq for the period January - February 2014 (0.127% of AL)); 0.00 MBq of 90 Sr - the value of the quarterly (0.00 MBq for the period January - March 2013 (0.000% of AL)); 0.014 MBq of 60 Co (0.023 MBq for the period January - February 2014 (0.103% of AL)); 0.000 of 239 Pu (0.000 MBq for the period January - March 2014 (0.000% of AL)). Volume of liquid effluents in February 2014 was 908 m 3 (1589 m 3 for the period January - February 2014). The radioactive effluents into atmosphere within February 2014 for FS KRAO were: 0.0002 MBq of gamma radionuclides (0.0007 MBq for the period January - February 2014, that is 0.0009% of annually limit (AL)); 0.000 MBq of alpha radionuclides (0.000 MBq for the period January - March 2014 (0.000% of AL)), and 0.000 MBq of 89 Sr and 90 Sr - the value of the quarterly (0.000 MBq for the period January - March 2014 (0.000% of AL)).

  6. Eco information 3. Influence of operation of the plants Jadrova vyradovacia spolocnost, a.s., on the environment, Locality of Mochovce, within March 2014

    International Nuclear Information System (INIS)

    2014-04-01

    In this leaflet the results of monitoring of radioactive gaseous and liquid effluents into the Hron River as well as of radiation monitoring of Mochovce Liquid RAW Final Treatment Facility (FS KRAO) and Mochovce Radioactive Waste Repository (RU RAO) are presented. The radioactive effluents into hydrosphere within March 2014 for the radioactive effluents into hydrosphere within for FS KRAO were: 0.056 GBq of tritium (0.056 for the period January - March 2014 (0.2% of AL)) and summary of gamma-radionuclides 0.465 GBq (0.465 GBq for the period January - March 2014 (11.92% of AL)). The radioactive effluents into hydrosphere within January - March 2014 for FS KRAO were: 0.000 kBq of 90 Sr (0.000% of AL)), 0.000 kBq of summary alpha (0.000% of AL) and 0.000 kBq of 14 C (0.000% of AL). The radioactive effluents into hydrosphere within March 2014 for RU RAO were: 0.000 MBq of tritium (3.976 MBq for the period January - March 2014 (0.021% of AL)); 0.000 MBq of 137 Cs (0.029 MBq for the period January - March 2014 (0.127% of AL)); 0.00 MBq of 90 Sr - the value of the quarterly (0.00 MBq for the period January - March 2014 (0.000% of AL)); 0.000 MBq of 60 Co (0.023 MBq for the period January - March 2014 (0.103% of AL)); 0.000 MBq of 239 Pu (0.000 MBq for the period January - March 2014 (0.000% of AL)). Volume of liquid effluents in March 2014 was 0 m 3 (1589 m 3 for the period January - March 2014). The radioactive effluents into atmosphere within March 2014 for FS KRAO were: 0.0006 MBq of gamma radionuclides (0.0013 MBq for the period January - March 2014, that is 0.0016% of annually limit (AL)); 0.00 MBq of alpha radionuclides (0.000 MBq for the period January - March 2014 (0.000% of AL)), and 0.000 MBq of 89 Sr and 90 Sr - the value of the quarterly (0.000 MBq for the period January - March 2014 (0.000% of AL)).

  7. Eco information 1. Influence of operation of the plants Jadrova vyradovacia spolocnost, a.s., on the environment, Locality of Mochovce, within January 2014

    International Nuclear Information System (INIS)

    2014-02-01

    In this leaflet the results of monitoring of radioactive gaseous and liquid effluents into the Hron River as well as of radiation monitoring of Mochovce Liquid RAW Final Treatment Facility (FS KRAO) and Mochovce Radioactive Waste Repository (RU RAO) are presented. The radioactive effluents into hydrosphere within January 2014 for the radioactive effluents into hydrosphere within for FS KRAO were: 0.0000 GBq of tritium (0.0000 GBq for the period January - January 2014 (0.000% of AL)) and summary of gamma-radionuclides 0.0000 GBq (0.0000 GBq for the period January - January 2014 (0.000% of AL)). The radioactive effluents into hydrosphere within January 2014 for FS KRAO were: 1,704 kBq of 90 Sr (0.009% of AL)), 0.012 kBq of summary alpha (0.053% of AL) and 0.000 kBq of 14 C (0.000% of AL). The radioactive effluents into hydrosphere within January 2014 for RU RAO were: 0.009 MBq of tritium (1.704 MBq for the period January - January 2014 (1.704% of AL)); 0.012 MBq of 137 Cs (0.012 MBq for the period January - January 2014 (0.053% of AL)); 0.000 MBq of 90 Sr - the value of the quarterly (0.000 MBq for the period January - January 2014 (0.000% of AL)); 0.009 MBq of 60 Co (0.009 MBq for the period January - January 2014 (0.04% of AL)); 0.000 MBq of 239 Pu (0.000 MBq for the period January - January 2014 (0.000% of AL)). Volume of liquid effluents in January 2014 was 681 m 3 (4681m 3 for the period January - January 2014). The radioactive effluents into atmosphere within January 2014 for FS KRAO were: 0.0005 MBq of gamma radionuclides (0.0005 MBq for the period January - January 2014, that is 0.0006% of annually limit (AL)); 0.000 MBq of alpha radionuclides (0.000 MBq for the period January - January 2014 (0.000% of AL)), and 0.000 MBq of 89 Sr and 90 Sr - the value of the quarterly (0.000 MBq for the period January - January 2014 (0.000% of AL)).

  8. SAT for NPP personnel training in USA

    International Nuclear Information System (INIS)

    Spinney, R.

    1995-01-01

    This discussion addressed the experience with the application of SAT at USA NPPs. In particular, the transition of NPP training processes, staff composition, and reporting structure from the TMI accident to present. As well, oversight and guidance activities of the INPO and more intensive inspection by the NRC began during this period. The average NPP training staff grew to 30-40 per unit, along with a change in reporting line from plant to corporate management. With the reduction of resources occurring in the late 1980s, overall training staff size decreased, the composition changed, and reporting line reverted to plant management. The overall lessons-learned for application of the SAT consisted of the need for simplification, management involvement, and exploitation of the technology

  9. Temporal variability of the NPP-GPP ratio at seasonal and interannual time scales in a temperate beech forest

    Directory of Open Access Journals (Sweden)

    M. Campioli

    2011-09-01

    Full Text Available The allocation of carbon (C taken up by the tree canopy for respiration and production of tree organs with different construction and maintenance costs, life span and decomposition rate, crucially affects the residence time of C in forests and their C cycling rate. The carbon-use efficiency, or ratio between net primary production (NPP and gross primary production (GPP, represents a convenient way to analyse the C allocation at the stand level. In this study, we extend the current knowledge on the NPP-GPP ratio in forests by assessing the temporal variability of the NPP-GPP ratio at interannual (for 8 years and seasonal (for 1 year scales for a young temperate beech stand, reporting dynamics for both leaves and woody organs, in particular stems. NPP was determined with biometric methods/litter traps, whereas the GPP was estimated via the eddy covariance micrometeorological technique.

    The interannual variability of the proportion of C allocated to leaf NPP, wood NPP and leaf plus wood NPP (on average 11% yr−1, 29% yr−1 and 39% yr−1, respectively was significant among years with up to 12% yr−1 variation in NPP-GPP ratio. Studies focusing on the comparison of NPP-GPP ratio among forests and models using fixed allocation schemes should take into account the possibility of such relevant interannual variability. Multiple linear regressions indicated that the NPP-GPP ratio of leaves and wood significantly correlated with environmental conditions. Previous year drought and air temperature explained about half of the NPP-GPP variability of leaves and wood, respectively, whereas the NPP-GPP ratio was not decreased by severe drought, with large NPP-GPP ratio on 2003 due mainly to low GPP. During the period between early May and mid June, the majority of GPP was allocated to leaf and stem NPP, whereas these sinks were of little importance later on. Improved estimation of seasonal GPP and of the

  10. Advances in safety countermeasures at the Tomari NPP of Hokkaido Electric Power on the basis of Fukushima Daiichi NPP accident. Fire protection and other advances

    International Nuclear Information System (INIS)

    Shibata, Taku; Dasai, Katsumi

    2014-01-01

    Fire protections for the nuclear power plants have been based on the fire laws and the conventional guide. After Fukushima Daiichi NPP accident, many safety countermeasures - also about Fire Protection - have been discussed in the Japanese authorities. This paper shows our present activities in the Tomari NPP about the fire protections from the view points of Fire Prevention, Fire Detection/Suppression Systems and Fire Protection, and other advances. (author)

  11. Mathematical simulation of gas pressure in fibre-reinforced concrete container at radiation and biological decomposition of cellulose, bituminized and concrete radwastes

    International Nuclear Information System (INIS)

    Kuruc, J.; Kvito, P.

    2005-01-01

    Fibre-reinforced concrete container (FRCC) are used for long-time repository of radioactive wastes. Low- and middle-active radwastes from operation of the NPPs V-1, V-2 Jaslovske Bohunice, Mochovce NPP and from decommissioned NPP A-1 (Jaslovske Bohunice) are treated in the plant SE-VYZ in Jaslovske Bohunice and after immobilisation are deposited in National Radwaste Repository Mochovce (RU RAO). After filling of the RU RAO, FRCC will be stored during 300 years. During this time the integrity of the FRCC must be guaranteed. By the influence of autoradiolysis of the cellulose and bituminized radwastes as well as in cement grout the gases are formed, mainly the hydrogen, methane and carbon dioxide. In the case of presence of available water (a w ≥ 0.63) and in presence of microbes and moulds at appropriate conditions the biological decomposition of cellulose materials may proceed with formation of H 2 , CH 4 a CO 2 . With increasing of developed gases may increase pressure in FRCC, that may initiate the loss of integrity of the FRCC with following endangering of radiation safety of the RU RAO, respectively of the territory over the repository.Authors developed the new mathematical model of pressure of gases in FRCC and in deposited barrels with cellulose and bituminized radwastes. The mathematical model is based on biological decomposition of cellulose materials as well as on radiation decomposition of cellulose, bitumen and concrete. In this mathematical model the diffusion through the walls of FRCC is the main process responsible for decreasing of the pressure. This model was developed in two basic variants: (1) Mathematical model of gas pressure in FRCC as function of dose; (2) Mathematical model of gas pressure in FRCC as function of mass of cellulose

  12. RAMOS - the radiation monitoring system of the Umweltforschungsinstitut Global 2000

    International Nuclear Information System (INIS)

    Exler, M.; Schmittner, W.

    2001-01-01

    The radiation early warning system RAMOS (radiation monitoring system) measures the radioactivity of the areas surrounding nuclear technical facilities (at present, around the Nuclear Power Plants Dukovany and Mochovce). Measurements are taken with Gamma-radiation devices of the type RS 03/X by the firm BITT- Technology. These devices are measuring equipment of the type Proportion-count tube with a detection range of 10 nSv/h to 10 Sv/h. The measuring stations consist of this Gamma measuring equipment, a personal computer with modem, back-up electricity devices and meteorological measuring devices. Six such measuring stations surrounding the facility comprise a complete measuring ring. The values are measured each minute. Considering the normal fluctuation in radiation measurements due to geology and weather conditions and the average background radiation, a certain alarm threshold is defined (on all stations this threshold is under 230 nSv/h). If this threshold is breached, immediately the data is transmitted through telephone lines and is received by the central office. Because of the short reaction time and low threshold, valuable time is gained for an emergency response by government agencies and the population. Official warning of the government agencies occurs after fulfilling the commendation of the Austrian Radiation Protection Commission. In the continued measurements from the end of 1994 to 2000 at NPP Dukovany and continuous measurements from NPP Mochovce from mid-1999 to the end of 2000, there was not a detection of dangerous levels of radiation were released into the atmosphere. After close examination of the measured data, different types of fluctuations could be observed - such as during the day-time period and short-term peaks after rain-fall. Detailed knowledge about trends in these fluctuations, allows an easier continual evaluation of a potential accident. The measured data is given to the public in graphic form every month via the Internet

  13. System for ecological monitoring and assessment for NPP site environment

    International Nuclear Information System (INIS)

    Vorob'ev, E.I.; Olejnikov, N.F.; Reznichenko, V.Yu.

    1987-01-01

    On the basis of the Leningrad NPP named after V.I. Lenin the development of a system for ecological monitoring and assessment (EMA) of the environment state and health of personnel and population has started in the EMA program framework. The program of ecological monitoring and assessment coordinates the works on the study of NPP effect on the nature and people, effect of separate factors and their combination, methods and models for the description of the effects, forecasting and evaluation, selection of the optimal protection strategies. Scientific foundations, structure and content of the EMA program are given to coordinate the works carried out according to the program with other works carried out in the country in this direction. The paper deals with the composition of monitoring parameters of the standard system of ecological monitoring of the environment for NPP

  14. NPP Krsko Lifetime Extension - Business Impact for Hrvatska Elektroprivreda

    International Nuclear Information System (INIS)

    Vrankic, K.; Krejci, M.; Lebegner, J.

    2006-01-01

    This paper deals with the analysis of possible business impacts for HEP in the case of NPP Krsko life extension. Due to numerous reasons nuclear power plant life extension of ten to twenty years is a common procedure abroad. Having this practise in mind as well as other circumstances in Croatian and Slovenian electric power system, the extension of NPP Krsko lifetime is considered to be a possible scenario. Foreseeable impacts of this decision are evaluated primarily with consideration of its effect on HEPs projected cash flows, though other aspects will be addressed as well. Preserving a well maintained production facility with an extraordinary operational record and stable, or possibly falling overall production costs seems as a very rational choice. This is particularly true having in mind expected rise of electricity demand and energy prices in the region. Having NPP Krsko in operation beyond 2023 implies that no replacement source for NPP Krsko capacity needs to be built. This means avoiding all costs connected with the construction and operation of the replacement plant, assuming it will be fossil fuelled. Due to the high uncertainty of the future fossil fuel prices, the avoidance of replacement plant operational cost is likely to prove as highly rewarding. It should be kept in mind that avoided costs also include the replacement plant greenhouse gases emission costs, thus further enlarging the list of value adding impacts. The latter is valid anticipating the ratification of the Kyoto protocol and joining the European emission trading scheme. In addition to that, the extension of NPP Krsko lifetime would mean that the majority of costs connected with the decommissioning and final waste disposal can be postponed further down the time line. This will have very positive financial and possibly technological impact. Other value creating effects for HEP that are foreseeable as a consequence of the plant lifetime extension include: maintaining the knowledge of

  15. Modernization of the oldest Swedish NPP

    International Nuclear Information System (INIS)

    Hagberth, Ronald

    1998-01-01

    OKG operates three BWR units of ABB design: Oskarshamn 1 with a net capacity of 440' MW, Oskarshamn 2 of 600 MW and Oskarshamn 3 of 1160 MW. Oskarshamn 1 NPP was commissioned in 1972 as the first commercial nuclear unit in Sweden. After more than twenty years of successful operation, the unit is now also the first reactor in Sweden to undergo a large safety modernization program. In the year 2000 the Oskarshamn 1 NPP will be modernized to a high level of safety standard and ready for operation for another period of at least 20 years. Experience gained can be used when modernizing other NPPs. The investment program for life extension is reasonable and shows that NPPs can be operated with an expected life span of more than 40 years at an ever-increasing safety level and still be very competitive in a deregulated market. (author)

  16. Integrated tool for NPP lifetime management in Spain

    Energy Technology Data Exchange (ETDEWEB)

    Francia, L. [UNESA, Madrid (Spain); Lopez de Santa Maria, J. [ASCO-Vandellos 2 NPPs l' Hospitalet de l' Infant, Tarragona (Spain); Cardoso, A. [Tecnatom SA, Madrid (Spain)

    2001-07-01

    The project for the Integrated Nuclear Power Plant Lifetime Management System SIGEVI (Sistema Integrado de GEstion de VIda de Centrales Nucleares) was initiated in April 1998 and finalized in December 2000, the main objective of the project being to develop a computer application facilitating the assessment of the condition and lifetime of nuclear power plant components. This constituted the second phase of a further-reaching project on NPP Lifetime Management. During the first phase of this project, carried out between 1992 and 1995, the methodology and strategy for the lifetime management of the Spanish NPP's were developed. Among others, degradation phenomena were assessed and the most adequate methods for their monitoring were defined. The SIGEVI Project has been performed under the management of UNESA (Spanish Electricity Association) and with the collaboration of different engineering firms and research institutes (Tecnatom, Empresarios Agrupados, Ufisa, Initec and IIT), with Vandellos II as the pilot plant. The rest of the Spanish NPP's have also actively participated through the Project Steering Committee. The following sections describe the scope, the structure and the main functionalities of the system SIGEVI. (authors)

  17. Integrated tool for NPP lifetime management in Spain

    International Nuclear Information System (INIS)

    Francia, L.; Lopez de Santa Maria, J.; Cardoso, A.

    2001-01-01

    The project for the Integrated Nuclear Power Plant Lifetime Management System SIGEVI (Sistema Integrado de GEstion de VIda de Centrales Nucleares) was initiated in April 1998 and finalized in December 2000, the main objective of the project being to develop a computer application facilitating the assessment of the condition and lifetime of nuclear power plant components. This constituted the second phase of a further-reaching project on NPP Lifetime Management. During the first phase of this project, carried out between 1992 and 1995, the methodology and strategy for the lifetime management of the Spanish NPP's were developed. Among others, degradation phenomena were assessed and the most adequate methods for their monitoring were defined. The SIGEVI Project has been performed under the management of UNESA (Spanish Electricity Association) and with the collaboration of different engineering firms and research institutes (Tecnatom, Empresarios Agrupados, Ufisa, Initec and IIT), with Vandellos II as the pilot plant. The rest of the Spanish NPP's have also actively participated through the Project Steering Committee. The following sections describe the scope, the structure and the main functionalities of the system SIGEVI. (authors)

  18. Preparation for Early Termination of Ignalina NPP Operation

    International Nuclear Information System (INIS)

    Poskas, P.; Poskas, R.

    2003-01-01

    Seimas (Parliament of Lithuania) approved updated National Energy strategy where it is indicated that first Unit will be shutdown before the year 2005 and second Unit in 2009 if funding for decommissioning is available from EU and other donors. In accordance to Ignalina NPP Unit 1 Closure Law the Government of Lithuania approved the Ignalina NPP Unit 1 Decommissioning Program until year 2005. For enforcement of this program, the plan of measures for implementation of the program was prepared and approved by the Minister of Economy. The plan consists of two parts, namely technical- environmental and social-economic. Technical-environmental measures are mostly oriented to the safe management of spent nuclear fuel and operational radioactive waste stored at the plant and preparation of licensing documents for Unit 1 decommissioning. Social-economic measures are oriented to mitigate negative social and economic impact on Lithuania, inhabitants of the region, and, particularly, o n the staff of Ignalina NPP by means of creating favorable conditions for a balanced social and economic development of the region. In this paper analysis of planned activities, licensing requirements for decommissioning, progress in preparation of the Final Decommissioning Plan is discussed

  19. Assessment of financial expenditure for Rivne NPP power units decommissioning

    International Nuclear Information System (INIS)

    Nosovskij, A.V.; Salij, L.M.

    2007-01-01

    The article covers some financial aspects of developing a decommissioning concept for Rivne NPP power units with reactor VVER-440 and VVER-1000. Possible methodological approaches to costs estimate have been analyzed. Preliminary results of cost estimation are presented for two decommissioning options: deferred and immediate dismantling. Principally possible options for accumulating assets have been analyzed to finance measures related to Rivne NPP decommissioning. A mathematical model has been proposed for creating decommissioning financial reserve

  20. On improving the NPP construction long-term planning

    International Nuclear Information System (INIS)

    Solov'ev, M.M.

    1980-01-01

    General approaches to solving the problems of long-term planning of the construction-mounting work volume and introduction of power capacities at different paces of power unit commission and norms of construction time are considered. Problems associated with location and development of subsidiary industries providing NPP construction are discussed. It is shown that decrease of WWER-1000 reactor type NPP construction time from 24 to 12 months results in reduction of required high-skilled engineers, managerial staff, unique construction mechanisms and engines as well as in improvement of conditions for conducting measures on work arrangement during preparation of construction industry and mounting of the first assemblies

  1. Tendencies of ecological changes in the region of Ignalina NPP and in Lake Drukshiai

    International Nuclear Information System (INIS)

    Pashkauskas, R.; Mazeika, J.; Baubinas, R.

    1999-01-01

    Since 1979, when the construction of the Ignalina Nuclear Power Plant started, a group of specialists from Lithuania research and academic institutions began to investigate both Lake Drukshiai - the cooler of the Ignalina NPP and the neighbouring area. The investigations were aimed not only at monitoring the environmental consequences of the Ignalina NPP impact but also at forecasting changes of the ecosystems. The State Scientific Program 'Ignalina Nuclear Power Plant and the Environment' was the result of final stage of complex investigations. This conference paper contains data on the changes of thermal state and water balance of Lake Drukshiai, the effect of permanent thermal and chemical pollution on the chemical composition and hydrochemical regime, the pollution of the lake water, the geochemical-contaminated state, the condition, dynamics and the changes of hydrobiont communities in Lake Drukshiai. Radioecological and eco toxicological state of Ignalina NPP region and Lake Drukshiai is estimated as well as changes in Lake Drukshiai and Ignalina NPP surrounding area ecosystems under the combine anthropogenic impact of the plant influence are elucidated. The findings on medical and biological studies in the Ignalina NPP influence population zone and the evidence of impact of Ignalina NPP on social-territorial processes in the region are presented as well

  2. Problems of complex automation of process at a NPP

    International Nuclear Information System (INIS)

    Naumov, A.V.

    1981-01-01

    The importance of theoretical investigation in determining the level and quality of NPP automation is discussed. Achievements gained in this direction are briefly reviewed on the example of domestic NPPs. Two models of the problem solution on function distribution between the operator and technical means are outlined. The processes subjected to automation are enumerated. Development of the optimal methods of power automatic control of power units is one of the most important problems of NPP automation. Automation of discrete operations especially during the start-up, shut-down or in imergency situations becomes important [ru

  3. The NPP Isar comprehensive Aging Management Program

    International Nuclear Information System (INIS)

    Zander, Andre; Ertl, Stefan

    2012-01-01

    The majority of System, Structure and Components (SSC) in a nuclear power plants are designed to experience a service life, which is far above the intended design life. In most cases, only a small percentage of SSCs are subject to significant aging effects, which may affect the integrity or the function of the component. The process of aging management (AM) has the objective to monitor and control degradation effects which may compromise safety functions of the plant. And furthermore, to ensure, that testing and maintenance programs sufficiently provide preventive measures to control degradation effects. Safety-related aspects and the targeted high availability of the power plant as well as the requirements stipulated by German regulatory authorities prompted the operator of NPP ISAR to introduce an aging surveillance program. The NPP Isar as well as the German NPPs has to be following in the scope of aging management the KTA 1403 guideline. The NPP Isar surveillance program based on the KTA 1403 guideline covers the following aspects: - Scoping and screening of safety relevant Systems, Structures and Components (SSC); - Identification of possible degradation mechanisms for safety relevant SSC; - Ensure, that testing and maintenance programs sufficiently provide preventive measures to control degradation effects; - Transferability check of industry experience (internal and external events); - Annual preparation of an AM status report. (author)

  4. Dynamic model for tritium build-up at NPP with RBMK type reactors and its enviromental beraviour

    International Nuclear Information System (INIS)

    Badyaev, V.V.; Egorov, Yu.A.; Ivanov, E.A.; Stegachev, G.F.; Tolstykh, V.D.

    1982-01-01

    A model of tritium production dynamics for a high power NPP with RBMK type reactors is proposed and investigated. The main ''skeleton'' model structure for forecasting tritium buildup at a NPP and its exchange with the environment has been singled out at a heuristic level. Decomposition and layout of the units have been performed by global functional relations of the investigated objects (NPP and environment). the model accounts for only oxidized tritium forms. Water exchange between the NPP subsystems and environment is the main mechanism for tritium migration. The model does not account for scheduled periodic maintenance work effects, presence of stagnant zones in the station circuits, fuel burn-up, etc. The parametric identification method applied in the model makes the model adaptable to particular situations and considered systems of the NPP and environment. Completing the model with necessary and sufficient experimental data one can pass to certain forecasting problems and to NPP control as a tritium source in the environment

  5. European cooperation under the modernization program of the Kozloduy NPP units 5 and 6 and its evolution during the Belene NPP construction

    International Nuclear Information System (INIS)

    Hoch, G.

    2005-01-01

    The major part of the modernization program for the Kozloduy NPP units 5 and 6 is being performed by the European Consortium Kozloduy (ECK), consisting of AREVA - FRAMATOME ANP (Germany and France) and Atomenergoexport (Russia). The ECK main project, consisting of 76 separate measures, shall be finished in the first half of 2006. One of the major tasks was to form the different teams on contractors and employers side such that the works can be executed effectively in a timely manner and as per the technical and quality requirements. Different actions were undertaken on both sides in order to assure the main target, namely to implement the complete scope of work within the contractual time schedule. So far it can be reported that the teams have successfully worked and as a matter of fact at present more than 100 outage days have been saved compared to the initial contractual time schedule. This important result is based on different success factors in the field of planning, engineering and design, outage organization, implementation including testing and commissioning, quality assurance. After the decision of Bulgaria to continue the erection of Belene NPP, a bidding consortium has been founded by the ECK Consortium members, in order to provide a joint offer for this project. The good reputation, expertise and the experience gained from the Kozloduy NPP units 5 and 6 modernization project together with a reliable network with Bulgarian industrial partners may contribute the utmost to a successful finalization of the Belene NPP. (author)

  6. Probabilistic assessment of the Juragua NPP response under Station Blackout conditions

    International Nuclear Information System (INIS)

    Valhuerdi Debesa, C.; Vilaragut Llanes, J.J.

    1996-01-01

    Assessment of the NPP response under SBO (station Blackout) conditions is a current safety issue of special interest, In the case of Juragua NPP, the safety assessment related to this topic is very important, taking into account the peculiarities of the Cuban Electro energetic System: small and long island, without possibilities of conexion beyond its borders and under the incidence of tropical phenomena In this papers a preliminary evaluation is presented of the potential incidence of Station Blackout conditions for Juragua NPP. the importance of this sort of events for the safety of the plant is evaluated, the factors which condition it are identified and measures for its prevention or recovering the normal situation if such an event takes place are proposed

  7. Modernization of tritium in air monitoring system for CANDU type NPP

    International Nuclear Information System (INIS)

    Purghel, L.; Iancu, R.; Popescu, M.

    2009-01-01

    Nuclear energy provides at present one third of Europe's electricity with nearly no greenhouse-gas emissions. Sustained efforts are now being conducted to harmonize regulations all over Europe through WENRA and to converge on technical nuclear safety practices within the TSO network ETSON (European Technical Safety Organizations Network). In order to achieve this goals of safety function, IFIN-HH together with CITON developed a new solution to improve the Tritium Monitoring System (TMS) of Cernavoda NPP and the new generation of CANDU type reactors, using Tritium in air Intelligent Monitors (TIM) developed and patented by IFIN-HH. The paper presents a comparative analysis between the technical characteristics of traditional solutions implemented in CANDU type NPP, particularly in Cernavoda NPP Unit 2 and the newly proposed solution. (authors)

  8. Further development of the Dynamic Control Assemblies Worth Measurement Method for Advanced Reactivity Computers

    International Nuclear Information System (INIS)

    Petenyi, V.; Strmensky, C.; Jagrik, J.; Minarcin, M.; Sarvaic, I.

    2005-01-01

    The dynamic control assemblies worth measurement technique is a quick method for validation of predicted control assemblies worth. The dynamic control assemblies worth measurement utilize space-time corrections for the measured out of core ionization chamber readings calculated by DYN 3D computer code. The space-time correction arising from the prompt neutron density redistribution in the measured ionization chamber reading can be directly applied in the advanced reactivity computer. The second correction concerning the difference of spatial distribution of delayed neutrons can be calculated by simulation the measurement procedure by dynamic version of the DYN 3D code. In the paper some results of dynamic control assemblies worth measurement applied for NPP Mochovce are presented (Authors)

  9. Technical support and emergency centre

    International Nuclear Information System (INIS)

    Bohun, L.; Kapisovsk y, M.

    1997-01-01

    This paper presents technical support and emergency management center which will be on two places: Mochovce NPP Emergency Centre (Technical support center and Support working center) and Reserve Emergency Centre in Levice (Reserve emergency center and Environmental Evaluation Center). The main aims of the emergency management centers are: the management and coordination of all persons and organisations; provision of the all information needed to evaluation of the accident and its mitigation; continuous evaluation of the potential or real radiological consequences; taking measure for an early notification of the governmental bodies and the organizations, warning and protection of the public; and other aims. In the next part the data for technical support and emergency centre are discussed

  10. Test research and analysis for ultimate capacity of Qinshan NPP PCCV

    International Nuclear Information System (INIS)

    Zufeng, X.

    1994-01-01

    This paper introduces design and research for containment of Qinshan NPP which is the first PWR in CHINA designed and constructed by ourselves. The PCCV design is basically in conformity to ASME code. To verify the structural integrity capacity of Qinshan NPP containment, we fulfilled SIT and ILRT successfully in June, 1991. The special attention of the paper is focused on the ultimate capacity of the PCCV under severe accidents and earthquake. A study comprised of five different independent parts has been performed for the development of containment model test and corresponding nonlinear analysis. There are two prestressed concrete containment models with equipment hatch. One is 1/15 scale with steel liner tested on shake table and then moved out loaded with atmospheric pressure. The other is 1/10 scale without steel liner loaded with water pressure until destruction. From different methods including model test and nonlinear analysis, all obtained unanimous conclusion. The capacity under internal pressure and earthquake is reliable. The safety margin is enough. Consequently, in the second phase of Qinshan NPP and other PWR NPP under design, PCCV should be a better selection in China since it's more economic, rational and safe. (author)

  11. Contribution of the Slovak University of Technology Bratislava to the Education of NPP Operation Staff in Slovakia

    International Nuclear Information System (INIS)

    Hascik, J.; Slugen, V.; Hinca, R.; Miglierini, M.

    2006-01-01

    Paper is focused on the preparation of NPP VVER -440 staff in Slovak conditions. The realisation is managed via special technical courses, seminars, workshops, and trainings on selected experimental facilities at domestic as well as international level. Post-gradual re-qualification study: Safety aspects of NPP operation is discussed in detail. Six-year experience with NPP operating staff education can be shared and recommended also at international level. Based on these courses, special training for optimal preparation of NPP supervising physicists was started in 2002. In addition to all our activities, the international course: Safety aspects of NPP operation for subcontractors was prepared and realised in 2005.(author)

  12. Seismic site evaluation practice and seismic design guide for NPP in Continent of China

    Energy Technology Data Exchange (ETDEWEB)

    Yuxian, Hu [State Seismological Bureau, Beijing, BJ (China). Inst. of Geophysics

    1997-03-01

    Energy resources, seismicity, NPP and related regulations of the Continent of China are briefly introduced in the beginning and two codes related to the seismic design of NPP, one on siting and another on design, are discussed in some detail. The one on siting is an official code of the State Seismological Bureau, which specifies the seismic safety evaluation requirements of various kinds of structures, from the most critic and important structures such as NPP to ordinary buildings, and including also engineering works in big cities. The one on seismic design of NPP is a draft subjected to publication now, which will be an official national code. The first one is somewhat unique but the second one is quite similar to those in the world. (author)

  13. Seismic site evaluation practice and seismic design guide for NPP in Continent of China

    International Nuclear Information System (INIS)

    Hu Yuxian

    1997-01-01

    Energy resources, seismicity, NPP and related regulations of the Continent of China are briefly introduced in the beginning and two codes related to the seismic design of NPP, one on siting and another on design, are discussed in some detail. The one on siting is an official code of the State Seismological Bureau, which specifies the seismic safety evaluation requirements of various kinds of structures, from the most critic and important structures such as NPP to ordinary buildings, and including also engineering works in big cities. The one on seismic design of NPP is a draft subjected to publication now, which will be an official national code. The first one is somewhat unique but the second one is quite similar to those in the world. (author)

  14. Chapter No.6. Radioactive waste (RAW)

    International Nuclear Information System (INIS)

    2002-01-01

    UJD SR supervises all phases of radioactive waste management at nuclear installations and final phases of institutional radioactive waste management. Total concentrates generation and minimisation trends during recent period (for NPP V1, NPP V2 Bohunice and NPP Mochovce) as well as increasing of their conditioning are presented. So nearly 8000 m3 of concentrates were stored at the end of year 2001, representing 75.5% of storage capacity at Bohunice site. Total amount of solid waste stored at VVER NPPs reached 3500 m3 at December 2001. The solid waste storage capacity of NPP V1 Bohunice is spent. NPP A1 Bohunice with a heterogeneous reactor using natural uranium, moderated by heavy water and cooled by CO 2 had been in operation for 4 years. It was finally shut down in February 1977 after an accident (INES level 4). Main activities in 2001 were focused on an increasing of radwaste management safety by the waste solidification or storage improvement, especially in the case of inorganic spent fuel coolant. The total solid radwaste inventory in 2001 (including filters) represents cca 700 m3 of soft and pre-pressed not sorted waste, 700 m3 of sorted waste, more then 1 000 t of scrap and next 260 m3 of scrap in drums. The total volume of contaminated soils and concrete is more than 7200 m3. The volume of solid radwaste depends on the extent of dismantling works and following treatment, conditioning and disposal. The total volume is also increased by products of bituminization and cementation facilities in drums stored before conditioning at NPP A1 Bohunice site. The facilities focused only on treatment of radwaste from NPP A1 decommissioning are operated by the same operator as a part of this decommissioned nuclear installation. Experimental and research treatment plants are operated by VUJE. A facility for the treatment and conditioning of operational liquid radwaste from NPP Mochovce is under preparation and a start of construction is foreseen in 2004. The nuclear

  15. Financing Nuclear Projects. Case Study: Unit 2 Cernavoda NPP

    International Nuclear Information System (INIS)

    Chirica, Teodor; Constantin, Carmencita; Dobrin, Marian

    2003-01-01

    The implementation of a Nuclear Power Plant (NPP) is a major undertaking for all entities involved, due to the necessity of planning work and coordination of the implementation process of the different fields of interest, starting with the governmental authorities and ending with the public. Having in view the specific investment costs (relatively high) for a NPP, finding an adequate financing structure is possible through an iterative process that involves first an assessment of the technical performances of the project and secondly, the mathematical modelling of the financing structure effects on the projects. In this respect, the paper will be focused on the main steps needed in order to promote an investment project in nuclear field, starting with the decision phase, providing the documentation requested by the local and international authorities to promote the project and ending with the negotiation of the contracts (commercial contract, financing contract, purchase contract, etc). The case study will be focused on the phases achieved in order to promote the Unit 2 NPP Cernavoda completion works project. (authors)

  16. Financing nuclear projects. Case study: Unit 2 Cernavoda NPP

    International Nuclear Information System (INIS)

    Chirica, T.; Pall, S.; Lebedev, A.; Dobrin, M.

    2003-01-01

    The implementation of a Nuclear Power Plant (NPP) in a country is a major undertaking for all entities involved, due to the necessity of planning work and co-ordination of the implementation process of the different fields of interest, starting with the governmental authorities and ending with the people. Having in view the specific investment cost (relatively high) for a NPP, to find an adequate financing structure is possible through an iterative process that involves first an assessment of the technical performances of the project and second, the mathematical modelling of the financing structure effects on the project. In this respect, the paper proposed will be focused on the main steps needed in order to promote an investment project in nuclear field, starting with the decision phase, providing the documentations requested by the local and international authorities to promote the project and ending with the negotiation of the contracts (commercial contract, financing contract, power purchase contract, etc.) The case study will be focused on the phases achieved in order to promote the Unit 2 Cernavoda NPP completion works project. (author)

  17. The installation of a modern training facility for the Kalinin NPP

    International Nuclear Information System (INIS)

    Parfenov, A.; Gronau, D.; Birnie, S.

    1996-01-01

    Kalinin NPP Management has initiated an ambitious programme of improvements to its overall training commitment. With the assistance of the consultancy services provided by Siemens, it is planned to realize this programme in terms of training and training premises conforming to the stated goal of the NPP Management, on a timescale only made possible by adopting a pragmatic approach to the systematic approach to training. 1 ref

  18. NPP safety and personnel training. XII International conference. Abstracts. Volume 2

    International Nuclear Information System (INIS)

    2011-01-01

    The XII International conference NPP Safety and Personnel Training took place in Obninsk, October 4-7 2011. The problems of personnel training for nuclear industry are discussed. The innovation nuclear systems and fuel cycle are considered. The much attention has been given to NPP radiation safety and radioecology issues. The recent high-speed computation and simulation methods used in reactor technology are presented [ru

  19. Remote technology in RBMK-1000 spent fuel management at NPP site

    International Nuclear Information System (INIS)

    Makarchuk, T.F.; Kozlov, Y.V.; Tikhonov, N.S.; Tokarenko, A.I.; Spichev, V.V.; Kaljazin, N.N.

    1999-01-01

    The report describes the remote technologies employed in the nuclear power plant with RBMK-1000 type. Spent fuel transfer and handling operations at reactor (AR) and away from reactor (AFR) on reactor site (RS) facilities are illustrated by the example of the Leningradskaya NPP and are typical for all NPPs with RBMK-1000. The current approach to spent fuel management at NPP sites is also presented. (author)

  20. The main trends of work on ageing and lifetime management of NPP

    International Nuclear Information System (INIS)

    Dragunov, Yu.

    1994-01-01

    The main trends of work on aging and lifetime management of nuclear power plants(NPP) in Russia are described including Russian research programs on NPP components lifetime assurance, technical assistance program for CIS, measures for life extension of reactor pressure vessels, steam generator collectors and components for advances reactor plants. Figs and tabs

  1. Calculation of economic and financing of NPP and conventional power plant using spreadsheet innovation

    International Nuclear Information System (INIS)

    Moch Djoko Birmano; Imam Bastori

    2008-01-01

    The study for calculating the economic and financing of Nuclear Power Plant (NPP) and conventional power plant using spreadsheet Innovation has been done. As case study, the NPP of PWR type of class 1050 MWe is represented by OPR-1000 (Optimized Power Reactor, 1000 MWe) and the conventional plant of class 600 MWe, is coal power plant (Coal PP). The purpose of the study is to assess the economic and financial feasibility level of OPR-1000 and Coal PP. The study result concludes that economically, OPR-1000 is more feasible compared to Coal PP because its generation cost is cheaper. Whereas financially, OPR-1000 is more beneficial compared to Coal PP because the higher benefit at the end of economic lifetime (NPV) and the higher ratio of benefit and cost (B/C Ratio). For NPP and Coal PP, the higher Discount Rate (%) is not beneficial. NPP is more sensitive to the change of discount rate compared to coal PP, whereas Coal PP is more sensitive to the change of power purchasing price than NPP. (author)

  2. Cernavoda NPP environmental management system - tool for managing the impact on the environment

    International Nuclear Information System (INIS)

    Gabriel, B.; Adrian, J.

    2009-01-01

    Nuclearelectrica SA (SNN SA) is a state owned company which produces nuclear-generated electricity, heat and CANDU 6 type nuclear fuel. The company has also an active participation in the power development program in Romania. The Cernavovoda NPP, one of the SNN branches is situated at 180 km east of Bucharest, in Constanta County at about 2 km SE from Cernavoda town is a CANDU 6 type. Cernavoda Nuclear Power Plant (NPP) is dedicated to generate electrical and thermal power, safely and efficiently for at least 30 years. Having an annual gross output of 5.2 - 5.4 MWh, the Cernavoda Unit 1 NPP provides 10% of the Romanian electric power production. Starting January 01 2007, the Cernavoda Unit 1 NPP supplied into the grid 5518346 MWh electric power and during 1997 - 2007 the Cernavoda Unit 1 NPP supplied into the grid 55769213 MWh electric powers. Over the same period Unit 1 also provided the partial district heating of the town of the Cernavoda supplying about 601517.9 Gcal. Romania second CANDU nuclear power plant, Cernavoda Unit 2, was officially placed in service on Friday, October 5, 2007 together with Unit 1, the CNE-Cernavoda Station is the largest power producer in the country. It now accounts for about 18 per cent of Romania energy supply and significantly reduces its dependency on expensive energy resources from outside of Europe. It provides a structured approach to planning and implementing environmental protection measures. It also establishes a framework for tracking, evaluating and communicating environmental performance. SNN SA mission is to operate the Cernavoda NPP - in a competitive, safe and environmental friendly manner so that the production is optimized and the economic life time of the plant is as long as possible. One major accomplishment is the achievement of ISO 14001 certification for our Environmental Management System (EMS) at Cernavoda NPP. The aim of this paper is to present the EMS implemented and to emphasize the outcomes of the

  3. International Collaboration in the Development of NPP Software

    International Nuclear Information System (INIS)

    Jiang, S.; Liu, L.; Yu, H.

    2015-01-01

    In this paper, we first review the progress and current status of international collaboration and technical exchange in the development of nuclear power plant (NPP) software by The State Nuclear Power Software Development Center (SNPSDC) in China. Then we discuss the importance of the international collaboration and exchange in the trend of globalisation of NPP technology. We also identify the role and contribution of professional women in this process. SNPSDC, the first professional software development centre for NPP in China, has been developing COSINE — a self-reliance NPP design and analysis software product with China brand—since 2010. Through participating in OECD/NEA’s joint projects, such as ROSA-2 Project, PKL–3 Project, HYMERES Project and ATLAS Project, SNPSDC shared data with other countries involved with respect to particular areas, such as high quality reactor thermal hydraulics test data. SNPSDC’s engineers have also been actively participating in international technical and research exchange for presenting their innovative work to the community while learning from peers. Our record shows that over 30 papers have been presented in international conferences with respect to nuclear reactor thermal hydraulics, safety analysis, reactor physics and software engineering within the past 4 years. The above international collaboration and technical exchange helped SNPSDC’s engineers to keep up with the state-of-art technology in this field. The large amount of valuable experimental data transferred to SNPSDC ensured the functionality, usability and reliability of software while greatly reduced the cost and shortened the cycle of development. Female engineers and other employees of SNPSDC either drove or got actively involved in a lot of aspects of the above collaboration and exchange, such as technical communication, business negotiation and overseas affairs management. These professional women played an irreplaceable role in this project by

  4. Radiation protection in decommissioning of the NPP V1

    International Nuclear Information System (INIS)

    Svitek, J.; Kaizer, J.; Siska, J.

    2014-01-01

    What's new in decommissioning of the NPP V1? In 2014 the first stage of the decommissioning should be finished. The program of the first stage was characterized by decommissioning of the non-contaminated facilities and buildings (facilities and buildings out of the control area). However, during the first stage, two key activities were done during which radiation protection had to be especially supervised: BIDSF project - Treatment and Conditioning of Wet Historical Waste - Sludge and Sorbents in the operational tanks NPP V1 (the treatment has been the condition of the regulatory body for the ending of the first stage) and preparation of decontamination of both primary circuits NPP (without reactors). In the year 2015, the second stage of decommissioning should be started. Program for the second stage is broad and it includes fragmentation and treatment of activated parts of the primary circuits (reactors, their internal parts, shielding cassettes). Modification of the radiation protection equipment on the NPP site has been made by BIDSF projects. During the first stage, two basic projects have been done: C12 - Refurbishment of the radiation protection monitoring equipment and C-10 - Free release of decommissioning materials. The present state of monitoring systems, as the result of the aforementioned projects, and the first experiences are main part of this presentation. Another activity, which prepared basic conditions for an execution of radiation protection in the second stage of decommissioning, was the preparation of documents for the procurement of license for the second stage of decommissioning. (authors)

  5. The psychological background about human error and safety in NPP

    International Nuclear Information System (INIS)

    Zhang Li

    1992-01-01

    A human error is one of the factors which cause an accident in NPP. The in-situ psychological background plays an important role in inducing it. The author analyzes the structure of one's psychological background when one is at work, and gives a few examples of typical psychological background resulting in human errors. Finally it points out that the fundamental way to eliminate the unfavourable psychological background of safety production is to establish the safety culture in NPP along with its characteristics

  6. VUJE's experience in the field of thermal-hydraulic behaviour of WWER

    International Nuclear Information System (INIS)

    Klepach, J.

    1995-01-01

    The thermal-hydraulic behavior (THB) of NPP coolant system and its consequences to nuclear safety of WWER reactors in previous Czechoslovakia has been studied in the VUJE (Nuclear Power Plants Research Institute, Trnava, SK). The institute takes part in the development and verification of its own (SLAP, LENKA, PUMKO, SICHTA, TRACO etc.) and international (DYNAMIKA5) codes for thermal-hydraulic analysis. The verification efforts are concentrated on the WWER specific features such as horizontal steam generators, control and safety system functioning, etc. The whole range of NPP accident analyses is covered by the VUJe staff. The author outlined briefly the WWER specific features as design and implemented improvements in Bohunice V-1 and Mochovce V-1 (WWER 230 model). The pros and cons of the WWER design compared against western type PWR are described. It is believed that although the WWERs are designed under the rules and standards of 1960s, their safety and operational performance can be improved to acceptable level by thorough analysis and appropriate measures. 5 figs

  7. NPP Temelin instrumentation and control system upgrade and verification

    International Nuclear Information System (INIS)

    Ubra, O.; Petrlik, J.

    1998-01-01

    Two units of Ver 1000 type of the Czech nuclear power plant Temelin, which are under construction are being upgraded with the latest instrumentation and control system delivered by WEC. To confirm that the functional design of the new Reactor Control and Limitation System, Turbine Control System and Plant Control System are in compliance with the Czech customer requirements and that these requirements are compatible with NPP Temelin upgraded technology, the verification of the control systems has been performed. The method of transient analysis has been applied. Some details of the NPP Temelin Reactor Control and Limitation System verification are presented.(author)

  8. Nonvascular contribution to ecosystem NPP in a subarctic heath during early and late growing season

    DEFF Research Database (Denmark)

    Campioli, Matteo; Samson, Roeland; Michelsen, Anders

    2009-01-01

    significant when vascular plants are less active and ecosystems act as a source of carbon (C). To clarify these dynamics, nonvascular and vascular aboveground NPP was compared for a subarctic heath during two contrasting periods of the growing season, viz. early-mid summer and late summer-early autumn...... measurements of shoot length increase. Vascular NPP was determined by harvesting shrub and herb apical growth and considering production due to stem secondary growth of shrubs. Hylocomium splendens and Pleurozium schreberi showed highest biomass growth in late summer, whereas for D. elongatum this occurred...... weight m-2 d-1, in early and late summer, respectively, whereas in the same periods vascular NPP was 3.6 and 1.1 g dry weight m-2 d-1. The contribution of nonvascular NPP to total aboveground NPP was therefore minor in early summer but substantial in late summer, when 25% of the C accumulated...

  9. Role and responsibilities of management in NPP personnel training and competence. Working material

    International Nuclear Information System (INIS)

    1994-01-01

    The main aim and result of this seminar was imparting knowledge to various levels of Paks NPP management on their special tasks and responsibilities to achieve personnel competence, which include: meeting relevant regulatory and other requirements; defining the qualifications for NPP personnel jobs; training using systematic approach to training to attain the required level of qualification and competence of all NPP personnel, which includes management, operations, maintenance and technical support personnel and others; recruiting and retaining qualified personnel, including career development; supporting the training of all personnel on their responsibilities for introducing, maintaining and improving safety. Refs, figs and tabs

  10. Investigation of toxic influence of Ignalina NPP waste water on Spirodela polyrrhiza culture

    International Nuclear Information System (INIS)

    Lakachauskiene, R.; Marchiulioniene, D.

    1995-01-01

    The influence of Ignalina NPP waste waters and of water taken in different biotop of lake Drukshiai on Spirodela polyrrhiza culture (growth intensity, biomass and morphological changes) was investigated. It was revealed that most polluted waters formed by Ignalina NPP outcomes were from industrial - rain sewerage and economic - domestic waste waters. Toxicity of all investigated waters was higher in autumn (October) than it was in spring (March -April). Comparative analysis of the data obtained in 1992-1994 indicated the growing tendency of toxicity in Ignalina NPP waste waters as well as lake Drukshiai water. (author). 5 refs., 4 figs

  11. Operating Experience at NPP Krsko

    International Nuclear Information System (INIS)

    Kavsek, D.; Bach, B.

    1998-01-01

    Systematic analysis of operational experience by assessment of internal and industry events and the feedback of lessons learned is one of the essential activities in the improvement of the operational safety and reliability of the nuclear power plant. At NPP Krsko we have developed a document called ''Operating Experience Assessment Program''. Its purpose is to establish administrative guidance for the processing of operating events including on-site and industry events. Assessment of internal events is based on the following methods: Event and Causal Factor Charting, Change Analysis, Barrier Analysis, MORT (Management Oversight and Risk Tree Analysis) and Human Performance Evaluation. The operating experience group has developed a sophisticated program entitled ''Operating experience tracking system'' (OETS) in response to the need for a more efficient way of processing internal and industry operating experience information. The Operating Experience Tracking System is used to initiate and track operational events including recommended actions follow up. Six screens of the system contain diverse essential information which allows tracking of operational events and enables different kinds of browsing. OETS is a part of the NPP Krsko nuclear network system and can be easily accessed by all plant personnel. (author)

  12. Computer Security of NPP Instrumentation and Control Systems: Cyber Threats

    International Nuclear Information System (INIS)

    Klevtsov, A.L.; Trubchaninov, S.A.

    2015-01-01

    The paper is devoted to cyber threats, as one of the aspects in computer security of instrumentation and control systems for nuclear power plants (NPP). The basic concepts, terms and definitions are shortly addressed. The paper presents a detailed analysis of potential cyber threats during the design and operation of NPP instrumentation and control systems. Eleven major types of threats are considered, including: the malicious software and hardware Trojans (in particular, in commercial-off-the-shelf software and hardware), computer attacks through data networks and intrusion of malicious software from an external storage media and portable devices. Particular attention is paid to the potential use of lower safety class software as a way of harmful effects (including the intrusion of malicious fragments of code) on higher safety class software. The examples of actual incidents at various nuclear facilities caused by intentional cyber attacks or unintentional computer errors during the operation of software of systems important to NPP safety.

  13. Approaches to the mathematical description of NPP operational safety management and oversight

    International Nuclear Information System (INIS)

    Bilej, D.V.; Berzhanskij, S.V.

    2014-01-01

    The paper presents analysis of features related to NPP operational safety management and oversight. According to analysis results, approaches are proposed to perform mathematical description of specific processes and to develop a scale for management to the current safety level as regards NPP power generation. Proposed approaches are making experimental equations and process approach of ISO-9001 quality system

  14. Safety parameter display system for Kalinin NPP

    International Nuclear Information System (INIS)

    Andreev, V.I.; Videneev, E.N.; Tissot, J.C.; Joonekindt, D.; Davidenko, N.N.; Shaftan, G.I.; Dounaev, V.G.; Neboyan, V.T.

    1995-01-01

    The paper discusses the safety parameter display system (SPDS), which is being designed for Kalinin NPP. The assessment of the safety status of the plant is done by the continuous monitoring of six critical safety functions and the corresponding status trees. Besides, a number of additional functions are realized within the scope of KlnNPP, aimed at providing the operator and the safety engineer in the main control room with more detailed information in accidental situation as well as during the normal operation. In particular, these functions are: archiving, data logs and alarm handling, safety actions monitoring, mnemonic diagrams indicating the state of main technological equipment and basic plant parameters, reference data, etc. As compared with the traditional scope of functions of this kind of systems, the functionality of KlnNPP SPDS is significantly expanded due to the inclusion in it the operator support function ''computerized procedures''. The basic SPDS implementation platform is ADACS of SEMA GROUP design. The system architecture includes two workstations in the main control room: one is for reactor operator and the other one for safety engineer. Every station has two CRT screens which ensures computerized procedures implementation and provides for extra services for the operator. Also, the information from the SPDS is transmitted to the local crisis center and to the crisis center of the State utility organization concern ''Rosenergoatom''. (author). 3 refs, 6 figs, 1 tab

  15. Optimization of radiation protection at Bohunice NPP

    International Nuclear Information System (INIS)

    Dobis, L.; Svitek, J.

    2003-01-01

    Bohunice Nuclear Power Plant is situated in south - western part of Slovakia about 50 km away from Bratislava. There are four PWR reactors 440 MW e each - two units with reactors WWER - 230 (V1 NPP) and two units with WWER - 213 (V2 NPP). requirements for the optimization process are given in the mentioned Code No.12 of Ministry of Health. Code 12 stipulates the technical and organizational requirements for proving the Rational Achievable Level (RAL) of radiation protection. This level can be proved by means of the comparison of the dose distribution to the costs of protection. An example of two figures of dose constraints is: collective dose 20 man mSv for the specific task; individual exposure 1 mSv per day. The values of the financial equivalents of personal exposure - so called the alpha coefficients - are used for the calculation of the benefit of proposed measures. Impact of legislative changes into Bohunice NPP and optimization process are presented. Apparently the new law and the associate code created a base of transparent and understandable policy of radiation protection and optimization in Slovak Republic. The radiation protection legislative was implemented into the praxis and persons became familiar with it. Defining clear and unambiguous terms facilitated the communication between users and the regulatory body - State Health Institute. Optimization was generally accepted by the workers and managers and began to be a part of safety culture of operation at nuclear power plants. (authors)

  16. Nuclear Power Plant (NPP) safety in Brazil

    International Nuclear Information System (INIS)

    Lederman, L.

    1980-01-01

    The multidisciplinary aspects of the activities involved in the nuclear power plant (NPP) licensing, are presented. The activities of CNEN's technical staff in the licensing of Angra-1 and Angra-2 power plants are shown. (E.G.) [pt

  17. Geological-Hydrological Site Evaluation for NPP Planning

    Energy Technology Data Exchange (ETDEWEB)

    Faust, Brigitte; Mini, Paolo [Nordostsschweizerische Kraftwerke AG NOK, Parkstrasse 23, 5401 Baden (Switzerland)

    2008-07-01

    NOK is investigating the potential replacement of the current NPP in Beznau. In order to meet the requirements with respect to a general licence application, geological, seismological, and geotechnical engineering, but also hydrological boundary conditions have been defined. These conditions define the nature of necessary investigations to obtain the geological, seismic, geotechnical and hydrological data themselves forming the basis to determine the site suitability. Viability has to be provided that a NPP can be built and operated at the proposed site without compromising public health, safety and environment. The collected data are also the basis for the design of all safety relevant structures, systems, and components. For example, the latter have to withstand the effects of natural phenomena such as earthquakes and human induced impact such as airplane crash without loosing their capability to perform the assigned safety functions. (authors)

  18. Geological-Hydrological Site Evaluation for NPP Planning

    International Nuclear Information System (INIS)

    Faust, Brigitte; Mini, Paolo

    2008-01-01

    NOK is investigating the potential replacement of the current NPP in Beznau. In order to meet the requirements with respect to a general licence application, geological, seismological, and geotechnical engineering, but also hydrological boundary conditions have been defined. These conditions define the nature of necessary investigations to obtain the geological, seismic, geotechnical and hydrological data themselves forming the basis to determine the site suitability. Viability has to be provided that a NPP can be built and operated at the proposed site without compromising public health, safety and environment. The collected data are also the basis for the design of all safety relevant structures, systems, and components. For example, the latter have to withstand the effects of natural phenomena such as earthquakes and human induced impact such as airplane crash without loosing their capability to perform the assigned safety functions. (authors)

  19. Welding facilities for NPP assembling

    International Nuclear Information System (INIS)

    Rojtenberg, S.S.

    1987-01-01

    Recommendations concerning the choice of equipment for welding in pre-assembling work shops, in the enlarging assembling shops and at the assembling site, are given. Advanced production automatic welders and semiautomatic machines, applied during the NPP equipment assembling as well as automatic machines specially produced for welding the main reactor components and pipelines are described. Automatic and semiautomatic machine and manual welding post supply sources are considered

  20. Sensitivity Analysis of Evacuation Speed in Hypothetical NPP Accident by Earthquake

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Sung-yeop; Lim, Ho-Gon [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2016-10-15

    Effective emergency response in emergency situation of nuclear power plant (NPP) can make consequences be different therefore it is regarded important when establishing an emergency response plan and assessing the risk of hypothetical NPP accident. Situation of emergency response can be totally changed when NPP accident caused by earthquake or tsunami is considered due to the failure of roads and buildings by the disaster. In this study evacuation speed has been focused among above various factors and reasonable evacuation speed in earthquake scenario has been investigated. Finally, sensitivity analysis of evacuation speed in hypothetical NPP accident by earthquake has been performed in this study. Evacuation scenario can be entirely different in the situation of seismic hazard and the sensitivity analysis of evacuation speed in hypothetical NPP accident by earthquake has been performed in this study. Various references were investigated and earthquake evacuation model has been developed considering that evacuees may convert their evacuation method from using a vehicle to walking when they face the difficulty of using a vehicle due to intense traffic jam, failure of buildings and roads, and etc. The population dose within 5 km / 30 km have been found to be increased in earthquake situation due to decreased evacuation speed and become 1.5 - 2 times in the severest earthquake evacuation scenario set up in this study. It is not agreed that using same emergency response model which is used for normal evacuation situations when performing level 3 probabilistic safety assessment for earthquake and tsunami event. Investigation of data and sensitivity analysis for constructing differentiated emergency response model in the event of seismic hazard has been carried out in this study.

  1. Sensitivity Analysis of Evacuation Speed in Hypothetical NPP Accident by Earthquake

    International Nuclear Information System (INIS)

    Kim, Sung-yeop; Lim, Ho-Gon

    2016-01-01

    Effective emergency response in emergency situation of nuclear power plant (NPP) can make consequences be different therefore it is regarded important when establishing an emergency response plan and assessing the risk of hypothetical NPP accident. Situation of emergency response can be totally changed when NPP accident caused by earthquake or tsunami is considered due to the failure of roads and buildings by the disaster. In this study evacuation speed has been focused among above various factors and reasonable evacuation speed in earthquake scenario has been investigated. Finally, sensitivity analysis of evacuation speed in hypothetical NPP accident by earthquake has been performed in this study. Evacuation scenario can be entirely different in the situation of seismic hazard and the sensitivity analysis of evacuation speed in hypothetical NPP accident by earthquake has been performed in this study. Various references were investigated and earthquake evacuation model has been developed considering that evacuees may convert their evacuation method from using a vehicle to walking when they face the difficulty of using a vehicle due to intense traffic jam, failure of buildings and roads, and etc. The population dose within 5 km / 30 km have been found to be increased in earthquake situation due to decreased evacuation speed and become 1.5 - 2 times in the severest earthquake evacuation scenario set up in this study. It is not agreed that using same emergency response model which is used for normal evacuation situations when performing level 3 probabilistic safety assessment for earthquake and tsunami event. Investigation of data and sensitivity analysis for constructing differentiated emergency response model in the event of seismic hazard has been carried out in this study

  2. Experimental analysis of specification language impact on NPP software diversity

    International Nuclear Information System (INIS)

    Yoo, Chang Sik; Seong, Poong Hyun

    1998-01-01

    When redundancy and diversity is applied in NPP digital computer system, diversification of system software may be a critical point for the entire system dependability. As the means of enhancing software diversity, specification language diversity is suggested in this study. We set up a simple hypothesis for the specification language impact on common errors, and an experiment based on NPP protection system application was performed. Experiment result showed that this hypothesis could be justified and specification language diversity is effective in overcoming software common mode failure problem

  3. The evolution of the fuel cycle in the Dukovany NPP

    Energy Technology Data Exchange (ETDEWEB)

    Bajgl, J [Jaderna Elektrarna, Dukovany (Czech Republic)

    1994-12-31

    The ten-year operational experience of four WWER-440 units in Dukovany NPP with a total number of 35 cycles is outlined. The strategy of fuel reloading has been changed from out-in schemes to low-leakage patterns. The linear pin power limitation will be introduced. The main physical limits and conditions for the NPP operation are listed. The main goal is to go to a full 4-year fuel cycle in which the burnup will be about 40 Mwd/kg U. 6 tabs.

  4. Rad-waste treatment

    International Nuclear Information System (INIS)

    1996-01-01

    The spent fuel coming from Slovak NPPs have partially been transported to the former Soviet Union, and a part of it is stored in an interim spent fuel wet storage. In compliance with the worldwide practices, further medium-term possibilities of storing in dry storages are under preparation. Disposal of a spent fuel and other high-level active wastes in a deep geological formation repository is the final solution. At present, there are geological investigations of possible sites in progress in Slovakia. Mochovce repository is a factory for a final disposal of compacted low and intermediate level radioactive wastes coming from the Slovak NPPs. This is a near-surface facility of a construction similar to the one used for disposal of radioactive wastes in France, Spain, Japan, Czech Republic, U.S.A, etc. Quality of the design, construction and functioning of the Mochovce's repository was assessed by an international team of experts within a special IAEA programme (WATRP). Having familiarized with the final report of the IAEA mission, Nuclear Regulatory Authority of the Slovak Republic (NRA SR) issued its position early in 1995, in which NRA SR required additional adjustment of the repository itself. Based on the NRA SR's position, Mochovce NPP invited experts from a number of institutions in September 1995 to discuss the NRA SR's requirements. Following was recommended by the experts: (1) to perform a complementary engineering-geological investigation on the site, (2) to use geophysical methods to verify existence of geological faults. In the next part a radioactive wastes that were treated at radioactive waste treatment lines in 1995 are listed. In 1995, the Chief Inspector of NRA SR issued an instruction that radioactive waste department should start inspections of radioactive waste treatment right in hospitals, research institutes and industries. Therefore, a total of 14 such workplaces were incorporated into a plan of inspections in 1995

  5. On the article of V. A. Mashin 'Computerized systems of NPP operators support. (Psychological problems)'

    International Nuclear Information System (INIS)

    Prushinskij, B.Ya.

    1995-01-01

    Basic aspects of V.A. Mashin's article on NPP operator support computerized systems and problems of man-machine interrelation are analyzed. Sharing in the significant degree Mashin's point of view the author of this article considers that the most important aspects of this problem consist in dividing the responsibility for NPP safe operation between all participants of the NPP creation and operation and in the area of practical experience in assuring control functions reliability

  6. Public opinion concerning completion of Khmelnitsky-2 and Rovno-4 NPP's construction for compensation of Chernobyl NPP shut-down

    International Nuclear Information System (INIS)

    Litvins'kij, L.L.; Novos'olov, G.M.; Majstrenko, O.V.; Sazonov, G.V.; Gryin, L.

    2001-01-01

    Interrogation of representation from non-government organizations and private persons from 46 countries about their opinion on completion of two NPP's construction revealed many comments about environmental effects, safety and economic aspects. These comments are analyzed by specialists

  7. Development of Information Datasheets of Nuclear Power Plant (NPP) Equipment using cfiXLM schema

    International Nuclear Information System (INIS)

    Lee, Jaiho; Song, Eunhye

    2014-01-01

    In 2009, EPRI (Electrical Power Research Institute) published a new NPP information handover guide to provide NPP owners and operators with data handover templates in consistent format for effective delivery of information during all stages of the handover process. Another difficult concern for NPP data information management is to exchange the data information among many organizations such as NPP owners, operators, engineering companies, suppliers, and vendors. As a matter of fact, the improperly formatted handover of information sometimes occurs due to the discrepancy of data format (e. g., data description language type). This improper delivery can make negative effects on NPP integrity and safety. Thus, the lack of proper exchange for different data information systems of organizations should be resolved by using an international standard data format. The standard data format can reduce the cost and time for data exchange in each phase for design, procurement, delivery, installation, operation and maintenance of equipment. The AEX(automating equipment information exchange) pilot implementation project team under EPRI advanced nuclear technology (ANT) program has been conducted a research for the use of XML equipment schemas for electronic data exchange(EDE). They applied XML equipment schema for the design, selection, quotation, purchase and mock install of a safety injection centrifugal pump using EDE standard HI(hydraulic institute) 50.7. For data exchange, FIATECH, an industry consortium, has equally developed library of templates and reference data for ISO-15926, which is an international standard capable of reducing data-error and delivery time for exchanging data among different organizations. KHNP as an only owner/operator company has not experienced much difficulty in data interoperability with other organizations, but continued its unremitting exertions to develop a robust system capable of managing data information generated in all the stages of NPP

  8. Development of Information Datasheets of Nuclear Power Plant (NPP) Equipment using cfiXLM schema

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Jaiho; Song, Eunhye [KHNP-Central Research Institute, Daejeon (Korea, Republic of)

    2014-05-15

    In 2009, EPRI (Electrical Power Research Institute) published a new NPP information handover guide to provide NPP owners and operators with data handover templates in consistent format for effective delivery of information during all stages of the handover process. Another difficult concern for NPP data information management is to exchange the data information among many organizations such as NPP owners, operators, engineering companies, suppliers, and vendors. As a matter of fact, the improperly formatted handover of information sometimes occurs due to the discrepancy of data format (e. g., data description language type). This improper delivery can make negative effects on NPP integrity and safety. Thus, the lack of proper exchange for different data information systems of organizations should be resolved by using an international standard data format. The standard data format can reduce the cost and time for data exchange in each phase for design, procurement, delivery, installation, operation and maintenance of equipment. The AEX(automating equipment information exchange) pilot implementation project team under EPRI advanced nuclear technology (ANT) program has been conducted a research for the use of XML equipment schemas for electronic data exchange(EDE). They applied XML equipment schema for the design, selection, quotation, purchase and mock install of a safety injection centrifugal pump using EDE standard HI(hydraulic institute) 50.7. For data exchange, FIATECH, an industry consortium, has equally developed library of templates and reference data for ISO-15926, which is an international standard capable of reducing data-error and delivery time for exchanging data among different organizations. KHNP as an only owner/operator company has not experienced much difficulty in data interoperability with other organizations, but continued its unremitting exertions to develop a robust system capable of managing data information generated in all the stages of NPP

  9. Core Management of NPPs in China and Experience of Tianwan NPP

    International Nuclear Information System (INIS)

    Guohan, G.

    2006-01-01

    The Current Status of the NPPs in China; the Nuclear Power Development Plan till 2020; the Fuel Management and the Core Management Strategy of NPPs are briefly presented in this paper. The gained experience during construction of Taiwan NPP, new design features and major construction milestones of Taiwan NPP are also discussed. The full list of 21 non-conformance reports (NCR) submitted by Jiangsu Nuclear Power Company to NNSA during construction of Taiwan NPP is given. The main issues raised during FSAR review like: RP operation with incomplete number of primary loops; Sedimentation in the construction and piping of service water system; Location of postulated pipe break; Stratification analysis for surge line of pressurizer; Safety classification of equipment in primary circuit; Fire resistant capability of cable insulation; Fire Hazard Analysis; Optimization of protection against ionizing radiation ect. are also listed

  10. Fusion of eastern and western technology in VVER 1000 NPP upgrade

    International Nuclear Information System (INIS)

    Ubra, O.; Fleischhans, J.; Kveton, M.

    1997-01-01

    An extensive modernization program upgrading two units of VVER 1000 type of the Czech nuclear power plant (NPP) Temelin to meet the latest international standards is presented. The program is based primarily on combination of eastern and western technology and it has been implemented during plant construction. The NPP Temelin was originally designed according to the standards of the former Soviet Union. After a series of reviews in the 1990s, a decision was made by the Temelin management of upgrade the design of the plant, including the supply of fuel and instrumentation and control system by a western company. The adoption of western technology and practices has helped to solve a large number of IAEA safety issues related to design and operation of VVER 1000 NPP. Details on the current Temelin design and other related safety matters are presented

  11. Revision 2 of the Program of NPP Krsko Decommissioning and SF and LILW Disposal

    International Nuclear Information System (INIS)

    Levanat, I.; Lokner, V.; Rapic, A.

    2010-01-01

    First joint Slovenian-Croatian Program of NPP Krsko Decommissioning and SF and LILW Disposal (DP) was completed in 2004 and formally adopted in 2005. As bilateral agreement on the NPP requires periodic revisions at least each 5 years, revision 2 of DP was started in September 2008, with the purpose to incorporate relevant developments since the 1st revision, to improve the level of details and reliability of DP, and to propose updated and more accurate cost estimates and appropriate financing models. In the first phase of the revision, new supporting studies for DP modules were prepared. Among these studies, the most demanding was the NPP Krsko specific Preliminary Decommissioning Plan (PDP), complying with the IAEA-recommended format, which included development of the NPP decommissioning inventory database. For upgrade of SF management, new and more detailed descriptions with improved cost estimates were prepared. Update of LILW disposal concept was based on new developments and projects prepared for the Slovenian repository. In the second phase of the revision, integrated DP scenarios were formulated and analyzed. They integrate NPP decommissioning together with RW and SF management/disposal into rationally inter-related sequences. Boundary conditions for this revision required: (a) that the reference scenario from the previous revision should be re-examined, with appropriate variations or new alternatives; (b) that the option of the NPP Krsko life extension should also be included; and (c) that the possibility of diverging interests of the contracting parties should also be analyzed (i.e. waste division and separate management). Finally, scenario evaluation is intended to compare the analyzed scenarios taking into account both their feasibility and estimated costs. It should provide the basis for determining future financing of DP, namely the annuities to be paid by the NPP Krsko owners into the national decommissioning funds.(author).

  12. Determining the contributions of urbanisation and climate change to NPP variations over the last decade in the Yangtze River Delta, China.

    Science.gov (United States)

    Wu, Shaohua; Zhou, Shenglu; Chen, Dongxiang; Wei, Zongqiang; Dai, Liang; Li, Xingong

    2014-02-15

    Terrestrial net primary production (NPP) is an important measure of global change, and identifying the relative contributions of urbanisation and climate change to NPP is important for understanding the impact of human and natural influences on terrestrial systems and the carbon cycle. The objective of this study was to reveal how urbanisation and climate drive changes in NPP. Satellite-based estimates of NPP collected over a 12-year period (1999-2010) were analysed to identify NPP variations in the Yangtze River Delta. Temporal and spatial analysis methods were used to identify the relationships among NPP, nighttime light urbanisation index values, and climatic factors from pixel to regional scales. The NPP of the entire Yangtze River Delta decreased slightly at a rate of -0.5 g C m(-2)a(-1) from 1999 to 2010, but this change was not significant. However, in the urban region, NPP decreased significantly (pclimate change to NPP variation. The results revealed that the urbanisation factor is the main driving force for NPP change in high-speed urbanisation areas, and the factor accounted for 47% of the variations. However, in the forest and farm regions, the NPP variation was mainly controlled by climate change and residual factors. Copyright © 2013 Elsevier B.V. All rights reserved.

  13. Redundant filtration system of the fuel buildings,units 1 and 2 Almaraz NPP

    International Nuclear Information System (INIS)

    Lopez Tanco, J.

    2011-01-01

    The project redundant filtering fuel buildings in units 1 and 2 of Almaraz NPP, will compliance to the requirements established in the complementary technical instructions to the authorization of exploitation of Almaraz NPP, established by the CSN and will consist of the installation of a new filtration unit.

  14. Load flow analysis for determining the location of NPP power distribution in West Kalimantan

    International Nuclear Information System (INIS)

    Citra Candranurani; Rizki Finnansyah Setya Budi; Sahala M Lumbanraja

    2015-01-01

    Electricity crisis condition happened in West Kalimantan (Kalbar) as a result of power plant capacity almost equal to the peak load. The system will experience a shortfall if there are plants that not operating and do not have reserve. The policy of electricity planning until 2022 is replacing diesel power plant with steam power plant. For long-term planning is required the role of new and renewable energy in order to reduce dependency on fossil fuel consumption, such as NPP utilization. The purpose of this study was to determine the optimum location of the NPP power distribution in order to prepare electricity infrastructure. Load flow calculation in this study using ETAP 12.5 software. NPP is planned to supply base load, so the optimum capacity factor is above 80 %. The result show that there are three location where NPP can generate over 80 % of its capacity, namely: Mempawah Substation, Singkawang Substation, and Sambas Substation. The most optimum located in Mempawah Substation with capacity factor 83.5 %. The location of the three Substation are onshore and in line with one requirement for NPP construction, namely: the availability of cooling water. (author)

  15. Cuba: Juragua NPP. Project Control. Annex 5

    International Nuclear Information System (INIS)

    Serradet, M.A.

    1999-01-01

    This annex deals with project control. The long suspension of Juragua NPP has affected personnel, equipment and site structures. Efforts are being made to revive the plant and to protect existing resources (assets). An action plan has been prepared. (author)

  16. External hazards considered for Paks NPP

    International Nuclear Information System (INIS)

    Kiss, Tibor

    2000-01-01

    PAKS NPP was built according to Soviet construction standards which took into account meteorological aspects but no documents for other external hazards were available. Main activities concerning earthquakes cover reevaluation of the plant site, seismic safety technological concept, improving the seismic resistance, installation of seismic monitoring and protection system, and seismic PSA

  17. Biotic elements of NPP techno-ecosystem

    International Nuclear Information System (INIS)

    Protasov, A.A.; Silaeva, A.A.

    2013-01-01

    Specific features of biotic elements in the NPP techno-ecosystems were considered and compared with natural ecosystems. Relationships between biotic communities and environmental factors that are specific to the techno-ecosystems were discussed, and the problems of limitation of biological hindrances in operation of equipment, principles of hydrobiological and environmental monitoring were considered.

  18. Application of reliability centered maintenance to Embalse NPP

    International Nuclear Information System (INIS)

    Torres, Antonio; Perdomo, Manuel; Fornero, Damian; Corchera, Roberto

    2010-01-01

    One of the most recent applications of Probabilistic Safety Analysis to Embalse NPP is the Safety Oriented Maintenance Program developed through the Reliability Centered Maintenance (RCM) methodology. Such an application was carried out by a cooperated effort between the staff of nuclear safety department of NPP and experts from Instituto Superior de Tecnologias y Ciencias Aplicadas of Cuba. So far 6 technological systems have been analyzed with important results regarding the optimization of preventive and predictive maintenance program of those systems. Any tasks of RCM were automated via MOSEG code. The results of this study were focused on the elaboration and modification of the Preventive Program, prioritization of stocks, reorientation of predictive techniques and modification in the time parameters of maintenance. (author)

  19. Automated personal dosimetry monitoring system for NPP

    International Nuclear Information System (INIS)

    Chanyshev, E.; Chechyotkin, N.; Kondratev, A.; Plyshevskaya, D.

    2006-01-01

    Full text: Radiation safety of personnel at nuclear power plants (NPP) is a priority aim. Degree of radiation exposure of personnel is defined by many factors: NPP design, operation of equipment, organizational management of radiation hazardous works and, certainly, safety culture of every employee. Automated Personal Dosimetry Monitoring System (A.P.D.M.S.) is applied at all nuclear power plants nowadays in Russia to eliminate the possibility of occupational radiation exposure beyond regulated level under different modes of NPP operation. A.P.D.M.S. provides individual radiation dose registration. In the paper the efforts of Design Bureau 'Promengineering' in construction of software and hardware complex of A.P.D.M.S. (S.H.W. A.P.D.M.S.) for NPP with PWR are presented. The developed complex is intended to automatize activities of radiation safety department when caring out individual dosimetry control. The complex covers all main processes concerning individual monitoring of external and internal radiation exposure as well as dose recording, management, and planning. S.H.W. A.P.D.M.S. is a multi-purpose system which software was designed on the modular approach. This approach presumes modification and extension of software using new components (modules) without changes in other components. Such structure makes the system flexible and allows modifying it in case of implementation a new radiation safety requirements and extending the scope of dosimetry monitoring. That gives the possibility to include with time new kinds of dosimetry control for Russian NPP in compliance with IAEA recommendations, for instance, control of the equivalent dose rate to the skin and the equivalent dose rate to the lens of the eye S.H.W. A.P.D.M.S. provides dosimetry control as follows: Current monitoring of external radiation exposure: - Gamma radiation dose measurement using radio-photoluminescent personal dosimeters. - Neutron radiation dose measurement using thermoluminescent

  20. Analysis of 14C level around Qinshan NPP base

    International Nuclear Information System (INIS)

    Huang Renjie; Liang Haiyan; Chen Qianyuan; Ni Shiying; He Jun; Zeng Guangjian; Ma Yongfu

    2012-01-01

    By using the method of alkaline solution absorption, the activity concentrations of Carbon-14 as well as its variation tendency in air and biological samples were analyzed. The air samples and biological samples were collected around the Qinshan nuclear power plant base (Qinshan NPP Base) in 2002 to 2009 and 2007 to 2009 respectively. The results showed that, since 2002, the annual average activity concentrations of Carbon-14 in air samples were in the range of 38.3 mBq/m 3 to 55.4 mBq/m 3 . Although the monitoring results of Xiajiawan village and Yanliucun village were comparatively higher than the reference site in Hangzhou City, the results were still at the same level. Meanwhile, monitoring results of Xiajiawan village and Yangliucun village in the summer of 2004 and 2005 are relatively high, with the peak value of 55.4 mBq/m 3 appeared in Xiajiawan village during the summer of 2005. Correspondingly the annual airborne Carbon-14 of 2004 and 2005 discharged from the Qinshan NPP 3 rd Phase were higher than normal as well, it can therefore be concluded that the activity concentration of Carbon-14 around the Qinshan NPP Base are related to the discharged source term. The activity concentration of Carbon-14 in rice and leaf vegetable samples from Xiajiawan village and Yangliucun village were slightly higher, but within the same level, than that of Hangzhou. The activity concentration of Carbon-14 in the mullet samples collected from the sea area around Qinshan NPP Base are approximately the same with the sea area of Zhoushan. (authors)